WorldWideScience

Sample records for raver-tacoma richland area

  1. 78 FR 4804 - Revision to the Washington State Implementation Plan; Tacoma-Pierce County Nonattainment Area

    Science.gov (United States)

    2013-01-23

    ... Washington State Implementation Plan; Tacoma- Pierce County Nonattainment Area AGENCY: Environmental... Tacoma-Pierce County nonattainment area for the 2006 fine particulate matter (PM 2.5 ) National Ambient... Rules.'' The updated PSCAA rules help implement the recommendations of the Tacoma-Pierce County Clean...

  2. Measurement of environmental radiation exposure rates from Vernita, Hanford Reach, and Richland area shores. Addendum 1

    International Nuclear Information System (INIS)

    Cooper, A.T.

    1995-02-01

    Environmental radiation exposure rate measurements are taken on and around the Hanford Site for Pacific Northwest Laboratory's Hanford Site Surface Environmental Surveillance Project. In 1992, environmental radiation exposure rate measurements were taken from shoreline and island areas ranging from Vernita, along the Hanford Reach, down to the Richland Pumphouse. Measurements were taken primarily at locations known or expected to have elevated exposure rates as determined by examination of aerial photographs depicting radiation exposure measurements. Results from the 1992 survey indicated radiation exposure rates taken from the Hanford Reach area were elevated in comparison to the measurements taken from the Vernita area with ranges of 8 to 28 μR/hr and 4 to 11 μR/hr, respectively. In January 1994, additional shoreline radiation exposure rate measurements were taken from the Vernita, Hanford Reach, and Richland areas to determine the relationship of radiation exposure rates along the Richland area shores when compared to Vernita and Hanford Reach area exposure rates (measurements along the Richland area were not collected during the 1992 survey). This report discusses the 1994 results and is an addendum to the report that discussed the 1992 survey. An analysis of variance indicated a significant location interaction at a p-value of 0.0014. To determine differences between paried locations a post-hoc comparison of location means was performed on log transformed data using the Scheffacute e's F-test. This test indicated a significant difference between Hanford Reach and Richland area means with a mean difference of 0.075 /μR/hr and a p-value of 0.0014. No significant difference was found between Hanford Reach and Vernita area means: The mean difference was 0.031 μR/hr and the p-value was 0.3138. No significant difference was found between Vernita and Richland area means with a mean difference of 0.044 μR/hr and a p-value of 0.1155

  3. Tacoma mode

    International Nuclear Information System (INIS)

    Courant, E.D.; Ruth, R.D.; Wang, J.M.

    1979-01-01

    The name Tacoma refers to the Tacoma Narrows Bridge which collapsed on November 8, 1940 due to massive oscillations caused by high winds. One of the destructive modes was a torsion mode which was excited by transverse wind, a dipole force, and continued until the bridge collapsed. The name is used to refer to a coherent mode of oscillation of a spectrum of oscillators in which the amplitude vs frequency graph contains one node, where the node occurs near the driving frequency and a(ω) is not symmetric about zero. When this result is applied to vertical instabilities in coasting beams, it implies the existence of a coherent skew quadrupole moment, whenever a coherent dipole oscillation exists

  4. Tacoma mode

    International Nuclear Information System (INIS)

    Courant, E.D.; Ruth, R.D.; Wang, J.M.

    1979-01-01

    The name Tacoma refers to the Tacoma Narrows Bridge which collapsed on November 8, 1940 due to massive oscillations caused by high winds. One of the destructive modes was a torsion mode which was excited by transverse wind, a dipole force, and continued until the bridge collapsed. The name is used to refer to a coherent mode of oscillation of a spectrum of oscillators in which the amplitude vs frequency graph contains one node, where the node occurs near the driving frequency and a ω is not symmetric about zero. When this result is applied to vertical instabilities in coasting beams, it implies the existence of a coherent skew quadrupole moment, Q/sub xy/, whenever a coherent dipole oscillation exists

  5. Habitat Evaluation Procedures (HEP) Report; Tacoma/Trimble Area Management Plan, Technical Report 2001-2003.

    Energy Technology Data Exchange (ETDEWEB)

    Entz, Ray; Lockwood, Jr., Neil; Holmes, Darren

    2003-10-01

    In 2000 and 2001, the Kalispel Natural Resource Department (KNRD) continued to mitigate the wildlife habitat losses as part of the Albeni Falls Wildlife Mitigation Project. Utilizing Bonneville Power Administration (BPA) funds, the Kalispel Tribe of Indians (Tribe) purchased three projects totaling nearly 1,200 acres. The Tacoma/Trimble Wildlife Management Area is a conglomeration of properties now estimated at 1,700 acres. It is the Tribe's intent to manage these properties in cooperation and collaboration with the Pend Oreille County Public Utility District (PUD) No. 1 and the U.S. Fish and Wildlife Service (USFWS) to benefit wildlife habitats and associated species, populations, and guilds.

  6. 78 FR 32131 - Revision to the Washington State Implementation Plan; Tacoma-Pierce County Nonattainment Area

    Science.gov (United States)

    2013-05-29

    ... speciation monitor and found no evidence of increasing fugitive dust trends from 2008 to 2011. See Tacoma PMF... request for these documents. For the convenience of the reader these background documents have been added...

  7. Tacoma, Washiington 1 arc-second DEM

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The 1-second Tacoma Washington Elevation Grid provides bathymetric data in ASCII raster format of 1-second resolution in geographic coordinates. This grid is...

  8. Tacoma, Washiington 3 arc-second DEM

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The 3-second Tacoma Washington Elevation Grid provides bathymetric data in ASCII raster format of 3-second resolution in geographic coordinates. This grid is...

  9. 2010 South Carolina DNR Lidar: Richland County

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Provide high density LiDAR elevation data map of Richland County, SC. Provide Bare Earth DEM (vegetation removal) of Richland County, SC.

  10. 300 Area process sewer piping upgrade and 300 Area treated effluent disposal facility discharge to the City of Richland Sewage System, Hanford Site, Richland, Washington

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-05-01

    The U.S. Department of Energy (DOE) is proposing to upgrade the existing 300 Area Process Sewer System by constructing and operating a new process sewer collection system that would discharge to the 300 Area Treated Effluent Disposal Facility. The DOE is also considering the construction of a tie-line from the TEDF to the 300 Area Sanitary Sewer for discharging the process wastewater to the City of Richland Sewage System. The proposed action is needed because the integrity of the old piping in the existing 300 Area Process Sewer System is questionable and effluents might be entering the soil column from leaking pipes. In addition, the DOE has identified a need to reduce anticipated operating costs at the new TEDF. The 300 Area Process Sewer Piping Upgrade (Project L-070) is estimated to cost approximately $9.9 million. The proposed work would involve the construction and operation of a new process sewer collection system. The new system would discharge the effluents to a collection sump and lift station for the TEDF. The TEDF is designed to treat and discharge the process effluent to the Columbia River. The process waste liquid effluent is currently well below the DOE requirements for radiological secondary containment and is not considered a RCRA hazardous waste or a State of Washington Hazardous Waste Management Act dangerous waste. A National Pollutant Discharge Elimination, System (NPDES) permit has been obtained from the U.S. Environmental Protection Agency for discharge to the Columbia River. The proposed action would upgrade the existing 300 Area Process Sewer System by the construction and operation of a new combined gravity, vacuum, and pressurized process sewer collection system consisting of vacuum collection sumps, pressure pump stations, and buried polyvinyl chloride or similar pipe. Two buildings would also be built to house a main collection station and a satellite collection station.

  11. Environmental Assessment Use of Existing Borrow Areas, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    2001-01-01

    The U.S. Department of Energy (DOE) operates the Hanford Site near Richland, Washington. The DOE needs to identify and operate onsite locations for a continued supply of raw aggregate materials [approximately 7,600,000 cubic meters (10,000,000 cubic yards) over the next 10 years] for new facility construction, maintenance of existing facilities and transportation corridors, and fill and capping material for remediation and other sites

  12. Habitat Evaluation Procedures (HEP) Report; Tacoma Creek South Project, Technical Report 2003-2005.

    Energy Technology Data Exchange (ETDEWEB)

    Entz, Ray

    2005-02-01

    On July 6, 2004, the Habitat Evaluation Procedure (HEP) was used to determine baseline habitat suitability on the Tacoma Creek South property, an acquisition completed by the Kalispel Tribe of Indians in June 2004. Evaluation species and appropriate models include bald eagle, black-capped chickadee, Canada goose, mallard, muskrat, yellow warbler, and white-tailed deer. Habitat Suitability Index (HSI) values were visually estimated and agreed upon by all HEP team members. The Tacoma Creek South Project provides a total of 190.79 Habitat Units (HUs) for the species evaluated. Emergent wetlands provide 20.51 HUs for Canada goose, mallard, and muskrat. Grassland provides 1.65 HUs for Canada goose and mallard. Scrub-shrub vegetation provides 11.76 HUs for mallard, yellow warbler, and white-tailed deer. Conifer forest habitat provides 139.92 HUs for bald eagle, black-capped chickadee, and white-tailed deer. Deciduous forest also provides 19.15 HUs for bald eagle, black-capped chickadee, mallard, and white-tailed deer. The objective of using HEP at the Tacoma Creek South Project and other protected properties is to document the quality and quantity of available habitat for selected wildlife species. In this way, HEP provides information on the relative value of the same area at future points in time so that the effect of management activities on wildlife habitat can be quantified. When combined with other tools, the baseline HEP will be used to determine the most effective on-site management, restoration, and enhancement actions to increase habitat suitability for targeted species. The same process will be replicated every five years to quantitatively evaluate the effectiveness of management strategies in improving and maintaining habitat conditions while providing additional crediting to BPA for enhanced habitat values.

  13. 700 Area

    Data.gov (United States)

    Federal Laboratory Consortium — The 700 Area of the Hanford Site is located in downtown Richland.Called the Federal Office Building, the Richland Operations Site Manager and the Richland Operations...

  14. Richland Environmental Restoration Project management action process document

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-04-01

    This document is the prescribed means for providing direct input to the US Department of Energy Headquarters regarding the status, accomplishments, strategy, and issues of the Richland Environmental Restoration Project. The project mission, organizational interfaces, and operational history of the Hanford Site are provided. Remediation strategies are analyzed in detail. The document includes a status of Richland Environmental Restoration project activities and accomplishments, and it presents current cost summaries, schedules, and technical baselines.

  15. Richland Environmental Restoration Project management action process document

    International Nuclear Information System (INIS)

    1996-04-01

    This document is the prescribed means for providing direct input to the US Department of Energy Headquarters regarding the status, accomplishments, strategy, and issues of the Richland Environmental Restoration Project. The project mission, organizational interfaces, and operational history of the Hanford Site are provided. Remediation strategies are analyzed in detail. The document includes a status of Richland Environmental Restoration project activities and accomplishments, and it presents current cost summaries, schedules, and technical baselines

  16. Richland Operations Office technology summary

    International Nuclear Information System (INIS)

    1994-05-01

    This document has been prepared by the Department of Energy's Environmental Management Office of Technology Development to highlight its research, development, demonstration, testing, and evaluation activities funded through the Richland Operations Office. Technologies and processes described have the potential to enhance cleanup and waste management efforts

  17. Richland Operations Office technology summary

    Energy Technology Data Exchange (ETDEWEB)

    1994-05-01

    This document has been prepared by the Department of Energy`s Environmental Management Office of Technology Development to highlight its research, development, demonstration, testing, and evaluation activities funded through the Richland Operations Office. Technologies and processes described have the potential to enhance cleanup and waste management efforts.

  18. The collapse of Tacoma Narrows Bridge: a piece to the puzzle

    DEFF Research Database (Denmark)

    Walther, Jens Honore; Christensen, D. S.; Malthe, M. G.

    On Nov. 7th 1940 the newly constructed Tacoma Narrows Bridge collapsed due to excessive torsional oscillations caused by the formation and shedding of large coherent vortices. The subsequent wind tunnel tests conducted on both section- and full bridge models concluded that the bridge should have ...

  19. Sudden lateral asymmetry and torsional oscillations in the original Tacoma suspension bridge

    Czech Academy of Sciences Publication Activity Database

    Malík, Josef

    2013-01-01

    Roč. 332, č. 15 (2013), s. 3772-3789 ISSN 0022-460X R&D Projects: GA MŠk ED2.1.00/03.0082 Institutional support: RVO:68145535 Keywords : torsional oscillations * Tacoma suspension bridge * Hamilton variational principle Subject RIV: BA - General Mathematics Impact factor: 1.857, year: 2013 http://www.sciencedirect.com/science/article/pii/S0022460X13001247

  20. Richland Operations Office (DOE-RL) Implementation Plan for DOE Order 435.1

    International Nuclear Information System (INIS)

    FRITZ, D.W.

    2000-01-01

    The U.S. Department of Energy issued U.S. Department of Energy Order 435.1, Radioactive Waste Management, and U.S. Department of Energy Manual 435.1-1, Radioactive Waste Management Manual, on July 9, 1999, to replace U.S. Department of Energy Order 5820.2A. Compliance is required by July 9, 2000, where compliance is defined as ''implementing the requirements, or an approved implementation, or corrective action plan'' (refer to Manual, Introduction, paragraph four). This implementation plan identifies the status of each requirement for U.S. Department of Energy, Richland Operations Office Site contractors, and provides the plan, cost, and length of time required for achieving full implementation. The U.S. Department of Energy, Richland Operations Office contractors (Fluor Hanford, Incorporated, DynCorp Tri-Cities Services, Bechtel Hanford, Inc., and Pacific Northwest National Laboratory) conducted a line-by-line review of DOE Order 435.1 and associated manuals to determine which requirements were new, and which requirements already are used for compliance with the previous DOE Order 5820.2A or other requirements. The Gap Analysis for DOE Order 435.1 (HNF-5465) identified compliance gaps, along with other issues that would impact efforts for achieving compliance. The gap analysis also contained a series of assumptions made by the various projects in determining compliance status. The details and section-by-section analysis are contained in Appendix A. Some of the DOE Order 435.1 requirements invoke sections of other DOE Orders not incorporated in various U.S. Department of Energy, Richland Operations Office contracts (refer to Section 2.0, Table 2-1). Those additional DOE Orders are identified by contractor and will be left for evaluation in accordance with each contractor's requirements. No attempt was made to evaluate all of those orders at this time, although in many cases, contractors follow a similar older DOE Order, which is cited in the Appendix. In some areas

  1. 78 FR 15053 - Simpson Lumber Company, LLC, Shelton, Washington; Simpson Lumber Company, LLC, Tacoma, Washington...

    Science.gov (United States)

    2013-03-08

    ...,372B] Simpson Lumber Company, LLC, Shelton, Washington; Simpson Lumber Company, LLC, Tacoma, Washington; Simpson Lumber Company, LLC, Longview, Washington; Notice of Revised Determination on Reconsideration On... Reconsideration for the workers and former workers of Simpson Lumber Company, LLC, Shelton, Washington (TA-W-81...

  2. 78 FR 78311 - Approval and Promulgation of Implementation Plans; Washington: Kent, Seattle, and Tacoma Second...

    Science.gov (United States)

    2013-12-26

    ... Amendments. The Washington Department of Ecology (Ecology) and the Puget Sound Clean Air Agency (PSCAA... prohibition on open burning, and industrial emission controls. These control measures were highly successful with monitoring data showing Kent, Seattle, and Tacoma meeting the PM 10 NAAQS since 1987, 1990, and...

  3. Aerial radiological survey of the Washington. Date of survey: July 1982 Public Power Supply System (WPPSS) Nuclear Project and surrounding area, Richland, Washington

    International Nuclear Information System (INIS)

    1983-07-01

    An aerial radiological survey was performed from 14 to 20 July 1982 over a 270-square-kilometer area centered on the Washington Public Power Supply System (WPPSS) Nuclear Project located near Richland, Washington. All gamma ray data were collected by flying parallel lines spaed 152 meters (500 feet) apart at an altitude of 91 meters (300 feet) above ground level. Count rates obtained from the aerial platform were converted to total external exposure rates at 1 meter above the ground and are presented in the form of an isoradiation contour map. The observed exposure rates ranged from 5 to 15 microroentgens per hour (μR/h) with the average background ranging from 9 to 12μR/h. These values include an estimated cosmic ray contribution of 3.7 μR/h. The exposure rates obtained from ground-based measurements taken in background locations within the survey area displayed positive agreement the aerial data

  4. A Study of Civilian Registered Nurse Recruitment at Madigan Army Medical Center, Tacoma, Washington.

    Science.gov (United States)

    1982-06-01

    34 May, 1981, "Nurse, Where Are You?" Judy Armstrong . 5 1nitial Report and Preliminary Recommendations, National Commission on Nursing (September 1981...Interview with Ms. R. Marsh, Staffing Specialist, Force Develop- ment Division, Madigan Army Medical Center, Tacoma, WA (Dec 81) 20Philip Kotler ...Marketing Management. Boston: Allyn and Bacon, Inc., 1980. Kotler , Philip. Marketing for Nonprofit Institutions. Englewood Cliffs, N.D.: Prentice-Hall

  5. Can the Afinion HbA1c Point-of-Care instrument be an alternative method for the Tosoh G8 in the case of Hb-Tacoma?

    Science.gov (United States)

    Lenters-Westra, Erna; Strunk, Annuska; Campbell, Paul; Slingerland, Robbert J

    2017-02-01

    Hb-variant interference when reporting HbA1c has been an ongoing challenge since HbA1c was introduced to monitor patients with diabetes mellitus. Most Hb-variants show an abnormal chromatogram when cation-exchange HPLC is used for the determination of HbA1c. Unfortunately, the Tosoh G8 generates what appears to be normal chromatogram in the presence of Hb-Tacoma, yielding a falsely high HbA1c value. The primary aim of the study was to investigate if the Afinion HbA1c point-of-care (POC) instrument could be used as an alternative method for the Tosoh G8 when testing for HbA1c in the presence of Hb-Tacoma. Whole blood samples were collected in K 2 EDTA tubes from individuals homozygous for HbA (n = 40) and heterozygous for Hb-Tacoma (n = 20). Samples were then immediately analyzed with the Afinion POC instrument. After analysis, aliquots of each sample were frozen at -80 °C. The frozen samples were shipped on dry ice to the European Reference Laboratory for Glycohemoglobin (ERL) and analyzed with three International Federation of Clinical Chemistry and Laboratory Medicine (IFCC) and National Glycohemoglobin Standardization Program (NGSP) Secondary Reference Measurement Procedures (SRMPs). The Premier Hb9210 was used as the reference method. When compared to the reference method, samples with Hb-Tacoma yielded mean relative differences of 31.8% on the Tosoh G8, 21.5% on the Roche Tina-quant Gen. 2 and 16.8% on the Afinion. The Afinion cannot be used as an alternative method for the Tosoh G8 when testing for HbA1c in the presence of Hb-Tacoma.

  6. 77 FR 64838 - Notice of Intent To Rule on Request To Release Airport Property at the Seattle-Tacoma...

    Science.gov (United States)

    2012-10-23

    ... To Release Airport Property at the Seattle-Tacoma International Airport, Seattle, Washington AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Notice of request to release airport property. SUMMARY... International Airport under the provisions of Section 125 of the Wendell H. Ford Aviation Investment Reform Act...

  7. 78 FR 15112 - Notice of Intent To Rule on Request To Release Airport Property at the Seattle-Tacoma...

    Science.gov (United States)

    2013-03-08

    ... To Release Airport Property at the Seattle-Tacoma International Airport, Seattle, Washington AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Notice of Request to Release Airport Property. SUMMARY... International Airport under the provisions of Section 125 of the Wendell H. Ford Aviation Investment Reform Act...

  8. Materials Developed from American Indian Culture-Based Curriculum Workshop (Tacoma, Washington, October 24-28, 1978). Book Two.

    Science.gov (United States)

    Disney, Dick, Comp.

    Developed as a result of the second 5-day American Indian Culture-Based Curriculum Workshop conducted in Tacoma, Washington, the resource guide presents materials oriented toward Native American dance, music, and games, which were the major thrust of the workshop. The guide provides four flannelboard stories/legends (How Man Was Created, The Gull…

  9. Environmental assessment for the resiting, construction, and operation of the Environmental and Molecular Sciences Laboratory at the Hanford Site, Richland, Washington

    Energy Technology Data Exchange (ETDEWEB)

    1994-07-01

    This environmental assessment (EA) presents estimated environmental impacts from the resiting, construction, and operation of the US Department of Energy`s (DOE`s) Environmental and Molecular Sciences Laboratory (EMSL), which is proposed to be constructed and operated on land near the south boundary of the Hanford Site near Richland, Washington. The EMSL, if constructed, would be a modern research facility in which experimental, theoretical, and computational techniques can be focused on environmental restoration problems, such as the chemical and transport behavior of complex mixtures of contaminants in the environment. The EMSL design includes approximately 18,500 square meters (200,000 square feet) of floor space on a 12-hectare (30-acre) site. The proposed new site is located within the city limits of Richland in north Richland, at the south end of DOE`s 300 Area, on land to be deeded to the US by the Battelle Memorial Institute. Approximately 200 persons are expected to be employed in the EMSL and approximately 60 visiting scientists may be working in the EMSL at any given time. State-of-the-art equipment is expected to be installed and used in the EMSL. Small amounts of hazardous substances (chemicals and radionuclides) are expected to be used in experimental work in the EMSL.

  10. Richland Environmental Restoration Project Baseline Multi Year Work Plan Volume 1 Richland Environmental Restoration Project Plan

    International Nuclear Information System (INIS)

    Wintczak, T.M.

    2001-01-01

    The purpose of this project specification is to provide an overall scoping and document for the Environmental Restoration project, and to provide a link between the overall Hanford Site scope and the ER project. The purpose of this project specification is to provide an overall scoping document for the ER Project, and to provide a link between the overall Hanford Site scope and the ER Project. Additionally, this specification provides an integrated and consolidated source of information for the Richland ER Project. It identifies the ER Project vision, mission, and goals, as well as the operational history of the Hanford Site, along with environmental setting and hazards. This ER Project Specification is part of the overall ER Project baseline

  11. United States Department of Energy Field Office, Richland, Environmental Protection Implementation Plan, November 9, 1990--November 9, 1991

    International Nuclear Information System (INIS)

    Paasch, R.A.

    1991-09-01

    The US Department of Energy (DOE) Order 5400.1 (DOE 1988a), General Environmental Protection Program, establishes environmental protection program requirements, authorities, and responsibilities to ensure that DOE operations are in compliance with applicable federal, state and local environmental protection laws and regulations, executive orders, and internal department policies. Chapter 3 of DOE Order 5400.1 requires that each field organization prepare a plan for implementing the requirements of this order and update this plan annually. Therefore, this update to the US Department of Energy -- Richland Operations Office Environmental Protection Implementation Plan for the Hanford Site, Richland, Washington, initially prepared November 9, 1989, is being issued. Responsibility for coordinating preparation of the annual update of this plan is assigned to the US Department of Energy Field Office, Richland, Safety and Environment Division's Environmental Oversight Branch

  12. Three-Fingered RAVERs: Rapid Accumulation of Variations in Exposed Residues of Snake Venom Toxins

    Science.gov (United States)

    Sunagar, Kartik; Jackson, Timothy N. W.; Undheim, Eivind A. B.; Ali, Syed. A.; Antunes, Agostinho; Fry, Bryan G.

    2013-01-01

    Rapid Accumulation of Variations in Exposed Residues (RAVER) to illustrate the significance of point mutations, guided by focal mutagenesis and positive selection in the evolution and diversification of 3FTx. PMID:24253238

  13. A Fisheries Evaluation of the Richland and Toppenish/Satus Canal Fish Screening Facilities, Spring 1986 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Neitzel, D.A.; Abernethy, C. Scott; Lusty, E. William

    1987-05-01

    The fisheries evaluation phase of diversion screen effectiveness summarizes the results of work at the Richland and Toppenish/Satus Fish screening facilities (Richland Screens and Toppenish/Satus Screens) during 1986. More than 10,000 steelhead, Salmo gairdneri, and chinook salmon, Oncorhynchus tshawytscha, were released at the screen diversions. At the Richland Screens, 61% of the released steelhead were recovered and 1.1% were descaled; 93% of the spring chinook salmon were recovered and less than 1% were descaled. At the Toppenish/Satus Screens, only steelhead were evaluated for descaling; 88.9% were recovered and 23.9% were descaled. Only steelhead were evaluated because the Yakima River fisheries managers did not expect any other smolts to occur in Toppenish Creek. Because of the acclimation conditions and the amount of time the fish had to be held before testing, some of the test population were descaled during holding and transportation. The 23.9% descaling for the test fish was compared to 26.4% for the controls.

  14. Richland Community College BioEnergy Program

    Energy Technology Data Exchange (ETDEWEB)

    Brauer, Douglas C. [Richland Community College, Decatur, IL (United States)

    2012-09-25

    The purpose of this project was to focus on education and community outreach. As such, it reflected anticipated growth in the renewable/alternative energy industry creating a vast need for trained industry professionals, engineers, operations managers, and technicians to operate state-of-the art production facilities. This project's scope leveraged Richland's initial entry in the renewable energy education, which included Associate of Applied Science degrees and certificates in biofuels and bioprocessing. This facilitated establishing a more comprehensive sustainability and renewable energy programs including experiential learning laboratory components needed to support new renewable energy education degree and certificate specialties, as well as community outreach. Renewable energy technologies addressed included: a) biodiesel, c) biomass, d) wind, e) geothermal, and f) solar. The objective is to provide increasingly innovative hands on experiential learning and knowledge transfer opportunities.

  15. Hanford Area 2000 Population

    International Nuclear Information System (INIS)

    Elliott, Douglas B.; Scott, Michael J.; Antonio, Ernest J.; Rhoads, Kathleen

    2004-01-01

    This report was prepared for the U.S. Department of Energy (DOE) Richland Operations Office, Surface Environmental Surveillance Project, to provide demographic data required for ongoing environmental assessments and safety analyses at the DOE Hanford Site near Richland, Washington. This document includes 2000 Census estimates for the resident population within an 80-kilometer (50-mile) radius of the Hanford Site. Population distributions are reported relative to five reference points centered on meteorological stations within major operating areas of the Hanford Site - the 100 F, 100 K, 200, 300, and 400 Areas. These data are presented in both graphical and tabular format, and are provided for total populations residing within 80 km (50 mi) of the reference points, as well as for Native American, Hispanic and Latino, total minority, and low-income populations

  16. Facility effluent monitoring plan determinations for the 200 Area facilities

    International Nuclear Information System (INIS)

    Nickels, J.M.

    1991-11-01

    The following facility effluent monitoring plan determinations document the evaluations conducted for the Westinghouse Hanford Company 200 Area facilities (chemical processing, waste management, 222-S Laboratory, and laundry) on the Hanford Site in south central Washington State. These evaluations determined the need for facility effluent monitoring plans for the 200 Area facilities. The facility effluent monitoring plan determinations have been prepared in accordance with A Guide for Preparing Hanford Site Facility Effluent Monitoring Plans, WHC-EP-0438 (WHC 1991). The Plutonium/Uranium Extraction Plant and UO 3 facility effluent monitoring plan determinations were prepared by Los Alamos Technical Associates, Richland, Washington. The Plutonium Finishing Plant, Transuranic Waste Storage and Assay Facility, T Plant, Tank Farms, Low Level Burial Grounds, and 222-S Laboratory determinations were prepared by Science Applications International Corporation of Richland, Washington. The B Plant Facility Effluent Monitoring Plan Determination was prepared by ERCE Environmental Services of Richland, Washington

  17. Data Quality Objectives Supporting Radiological Air Emissions Monitoring for the PNNL Richland Campus

    Energy Technology Data Exchange (ETDEWEB)

    Snyder, Sandra F. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Moleta, Donna Grace L. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Meier, Kirsten M. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Barnett, John M. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2017-12-31

    This is the second revision of the DQO Supporting Radiological Air Emissions Monitoring for the Pacific Northwest National Laboratory Richland Campus. In January 2017, the PNNL Richland Campus expanded to the north by 0.35 km2 (85.6 acres). Under the requirements of Washington State Department of Health Radioactive Air Emissions License (RAEL)-005, the PNNL Campus operates and maintains a radiological air monitoring program. This revision documents and evaluates the newly acquired acreage while also removing recreational land at the southwest, and also re-examines all active radioactive emission units on the PNNL Campus. No buildings are located on this new Campus land, which was transferred from the U.S. DOE Hanford Site. Additionally, this revision includes information regarding the background monitoring station PNL-5 in Benton City, Washington, which became active in October 2016. The key purpose of this revision is to determine the adequacy of the existing environmental surveillance stations to monitor radiological air emissions in light of this northern boundary change.

  18. Tank Waste Remediation System, Hanford Site, Richland, Washington. Final Environmental Impact Statement. Volume IV

    International Nuclear Information System (INIS)

    1996-08-01

    This document, Volume 4, describes the current safety concerns associated with the tank waste and analyzes the potential accidents and associated potential health effects that could occur under the alternatives included in this Tank Waste Remediation System (TWRS) Final Environmental Impact Statement (EIS) for the Hanford Site, Richland, Washington

  19. Fuels and Materials Examination Facility: Environmental assessment, Hanford site, Richland, Washington: Environmental assessment

    International Nuclear Information System (INIS)

    1980-07-01

    The Fuels and Materials Examination Facility (FMEF) and the High Performance Fuel Laboratory (HPFL) were originally proposed to be constructed as separate facilities in the 400 Area of the Hanford Site near Richland, Washington. The environmental effects of these two facilities were described and evaluated in the FMEF Environmental Assessment and the HPFL Final Environmental Impact Statement, ERDA-1550. For economic reasons, the two facilities will no longer be built as separate facilities. The FMEF facility plans have been modified to incorporate some of the features of the proposed HPFL facility while retaining essentially all of the capabilities of the original FMEF proposal. The purpose of this document is to update the FMEF Environmental Assessment to appropriately reflect addition of certain HPFL features into the FMEF facility and to assess the environmental affects of the facility which resulted from inclusion of HPFL features into the FMEF facility

  20. Richland Environmental Restoration Project management action process document

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-04-01

    A critical mission of the U.S. Department of Energy (DOE) is the planning, implementation, and completion of environmental restoration programs at DOE facilities. An integral part of this mission involves the safe and cost-effective environmental restoration of the Hanford Site. For over 40 years the Hanford Site supported United States national defense programs, largely through the production of nuclear materials. One legacy of historical Hanford Site operations is a significant waste inventory of radioactive and/or regulated chemical materials. Releases of these materials have, in some cases, contaminated the Hanford Site environment. The DOE Richland Operations Office (RL) is responsible for protecting human health and the environment from potential Hanford Site environmental hazards by identifying, assessing, and mitigating risks posed by contaminated sites.

  1. Richland Environmental Restoration Project management action process document

    International Nuclear Information System (INIS)

    1996-04-01

    A critical mission of the U.S. Department of Energy (DOE) is the planning, implementation, and completion of environmental restoration programs at DOE facilities. An integral part of this mission involves the safe and cost-effective environmental restoration of the Hanford Site. For over 40 years the Hanford Site supported United States national defense programs, largely through the production of nuclear materials. One legacy of historical Hanford Site operations is a significant waste inventory of radioactive and/or regulated chemical materials. Releases of these materials have, in some cases, contaminated the Hanford Site environment. The DOE Richland Operations Office (RL) is responsible for protecting human health and the environment from potential Hanford Site environmental hazards by identifying, assessing, and mitigating risks posed by contaminated sites

  2. DOE Richland readiness review for PUREX

    International Nuclear Information System (INIS)

    Zamorski, M.J.

    1984-01-01

    For ten months prior to the November 1983 startup of the Plutonium and URanium EXtraction (PUREX) Plant, the Department of Energy's Richland Operations Office conducted an operational readiness review of the facility. This review was performed consistent with DOE and RL Order 5481.1 and in accordance with written plans prepared by the program and safety divisions. It involved personnel from five divisions within the office. The DOE review included two tasks: (1) overview and evaluation of the operating contractor's (Rockwell Hanford) readiness review for PUREX, and (2) independent assessment of 25 significant aspects of the startup effort. The RL reviews were coordinated by the program division and were phased in succession with the contractor's readiness review. As deficiencies or concerns were noted in the course of the review they were documented and required formal response from the contractor. Startup approval was given in three steps as the PUREX Plant began operation. A thorough review was performed and necessary documentation was prepared to support startup authorization in November 1983, before the scheduled startup date

  3. City of Richland 300 Area industrial wastewater permit application

    International Nuclear Information System (INIS)

    1995-05-01

    Battelle-Pacific Northwest Labs and Westinghouse Hanford Co. are responsible for operating most of the facilities within the 300 Area; other contractors are also involved. The document gives briefly water/wastewater data: water sources, water usage, water discharge/loss, NPDES permit status, plant sewer outlets size and flow, etc. The document also includes the following attachments: 300 Area building list, Oct. 1993-Oct. 1994 300 Area water balance, waste shipments for CY 1994, complete chemical listing, sanitary sewer sampling results (12/19/94, 1/18/95, 1/15/95), and priority pollutant listings

  4. Environmental Assessment: Waste Tank Safety Program, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1994-02-01

    The US Department of Energy (DOE) needs to take action in the near-term, to accelerate resolution of waste tank safety issues at the Hanford Site near the City of Richland, Washington, and reduce the risks associated with operations and management of the waste tanks. The DOE has conducted nuclear waste management operations at the Hanford Site for nearly 50 years. Operations have included storage of high-level nuclear waste in 177 underground storage tanks (UST), both in single-shell tank (SST) and double-shell tank configurations. Many of the tanks, and the equipment needed to operate them, are deteriorated. Sixty-seven SSTs are presumed to have leaked a total approximately 3,800,000 liters (1 million gallons) of radioactive waste to the soil. Safety issues associated with the waste have been identified, and include (1) flammable gas generation and episodic release; (2) ferrocyanide-containing wastes; (3) a floating organic solvent layer in Tank 241-C-103; (4) nuclear criticality; (5) toxic vapors; (6) infrastructure upgrades; and (7) interim stabilization of SSTs. Initial actions have been taken in all of these areas; however, much work remains before a full understanding of the tank waste behavior is achieved. The DOE needs to accelerate the resolution of tank safety concerns to reduce the risk of an unanticipated radioactive or chemical release to the environment, while continuing to manage the wastes safely

  5. Accident investigation board report on the May 14, 1997, chemical explosion at the Plutonium Reclamation Facility, Hanford Site,Richland, Washington - final report

    International Nuclear Information System (INIS)

    Gerton, R.E.

    1997-01-01

    On May 14, 1997, at 7:53 p.m. (PDT), a chemical explosion occur-red in Tank A- 109 in Room 40 of the Plutonium Reclamation Facility (Facility) located in the 200 West Area of the Hanford Site, approximately 30 miles north of Richland, Washington. The inactive processing Facility is part of the Plutonium Finishing Plant (PFP). On May 16, 1997, Lloyd L. Piper, Deputy Manager, acting for John D. Wagoner, Manager, U.S. Department of Energy (DOE), Richland Operations Office (RL), formally established an Accident Investigation Board (Board) to investigate the explosion in accordance with DOE Order 225. 1, Accident Investigations. The Board commenced its investigation on May 15, 1997, completed the investigation on July 2, 1997, and submitted its findings to the RL Manager on July 26, 1997. The scope of the Board's investigation was to review and analyze the circumstances of the events that led to the explosion; to analyze facts and to determine the causes of the accident; and to develop conclusions and judgments of need that may help prevent a recurrence of the accident. The scope also included the application of lessons learned from similar accidents within DOE. In addition to this detailed report, a companion document has also been prepared that provides a concise summary of the facts and conclusions of this report, with an emphasis on management issues (DOE/RL-97-63)

  6. Routine environmental audit of the Hanford Site, Richland, Washington

    Energy Technology Data Exchange (ETDEWEB)

    1994-05-01

    This report documents the results of the routine environmental audit of the Hanford Site (Hanford), Richland, Washington. During this audit, the activities conducted by the audit team included reviews of internal documents an reports from previous audits and assessments; interviews with US Department of Energy (DOE), State of Washington regulatory, and contractor personnel; and inspections and observations of selected facilities and operations. The onsite portion of the audit was conducted May 2--13, 1994, by the DOE Office of Environmental Audit (EH-24), located within the Office of Environment, Safety and Health (EH). The audit evaluated the status of programs to ensure compliance with Federal, State, and local environmental laws and regulations; compliance with DOE orders, guidance, and directives; and conformance with accepted industry practices and standards of performance. The audit also evaluated the status and adequacy of the management systems developed to address environmental requirements.

  7. Routine environmental audit of the Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1994-05-01

    This report documents the results of the routine environmental audit of the Hanford Site (Hanford), Richland, Washington. During this audit, the activities conducted by the audit team included reviews of internal documents an reports from previous audits and assessments; interviews with US Department of Energy (DOE), State of Washington regulatory, and contractor personnel; and inspections and observations of selected facilities and operations. The onsite portion of the audit was conducted May 2--13, 1994, by the DOE Office of Environmental Audit (EH-24), located within the Office of Environment, Safety and Health (EH). The audit evaluated the status of programs to ensure compliance with Federal, State, and local environmental laws and regulations; compliance with DOE orders, guidance, and directives; and conformance with accepted industry practices and standards of performance. The audit also evaluated the status and adequacy of the management systems developed to address environmental requirements

  8. 40 CFR 81.348 - Washington.

    Science.gov (United States)

    2010-07-01

    ... 5/14/01 Attainment The City of Kent and a portion of the Green River valley bounded on the east and... Type Seattle-Tacoma Area: Seattle-Tacoma Urban Area (as defined by the Washington Department of Transportation urban area maps) King County (part) Attainment Pierce County (part) Attainment Snohomish County...

  9. Statement of John H. Anttonen, Project Manager, Basalt Waste Isolation Project, Richland Operations Office, Department of Energy

    International Nuclear Information System (INIS)

    Anon.

    1987-01-01

    My name is John Anttonen and I am the Project Manager for the Basalt Waste Isolation Project (BWIP) at the Department of Energy Richland Operation Office. The responsibilities of may office are to manage the day-to-day activities of the site suitability investigations of the basalt formations at the Hanford Site, a Department complex that is involved in a variety of national missions, including defense materials production, nuclear energy research, and radioactive waste management. In may prepared comments today I would like to touch upon four specific subject areas relating to the BWIP program and then I would be happy to answer any questions you might have. The topics I will cover are: (1) historical aspects; (2) site specific technical issues and how they will be addressed during site characterization of the basalt site at Hanford; (3) current project status and; (4) institutional interaction. For clarity, I have attached several charts to my statement

  10. 300 Area steam plant replacement, Hanford Site, Richland, Washington: Environmental assessment

    International Nuclear Information System (INIS)

    1997-03-01

    Steam to support process operations and facility heating is currently produced by a centralized oil-fired plant located in the 300 Area and piped to approximately 26 facilities in the 300 Area. This plant was constructed during the 1940s and, because of tis age, is not efficient, requires a relatively large operating and maintenance staff, and is not reliable. The US Department of Energy is proposing an energy conservation measure for a number of buildings in the 300 Area of the Hanford Site. This action includes replacing the centralized heating system with heating units for individual buildings or groups of buildings, constructing new natural gas pipelines to provide a fuel source for many of these units and constructing a central control building to operate and maintain the system. A new steel-sided building would be constructed in the 300 Area in a previously disturbed area at least 400 m (one-quarter mile) from the Columbia River, or an existing 300 Area building would be modified and used. This Environmental Assessment evaluates alternatives to the proposed actions. Alternatives considered are: (1) the no action alternative; (2) use of alternative fuels, such as low-sulfur diesel oil; (3) construction of a new central steam plant, piping and ancillary systems; (4) upgrade of the existing central steam plant and ancillary systems; and (5) alternative routing of the gas distribution pipeline that is a part of the proposed action. A biological survey and culture resource review and survey were also conducted

  11. Environmental assessment of the F Area decommissioning program, Hanford site, Richland, Washington

    International Nuclear Information System (INIS)

    1980-10-01

    The environmental impact of the proposed decommissioning of the 100-F Area is primarily beneficial resulting in the removal and/or stabilization of potentially hazardous and radioactively contaminated structures. Contaminated solid wastes generated as the result of the F-Area decommissioning will be buried in existing burial facilities in the 200 Areas. Contaminated solid wastes generated as the result of the 100-F Area decommissioning will contain about 2% of the existing radionuclide inventory in the 200 Area solid waste burial facilities. (LM)

  12. Environmental Assessment for the Transfer of 1100 AREA, Southern Rail Connection and Rolling Stock, Hanford Site, Richland, Washington

    Energy Technology Data Exchange (ETDEWEB)

    N/A

    1998-08-01

    This environmental assessment (EA) has been prepared to assess potential environmental impacts associated with the U.S. Department of Energy's proposed action: the transfer of the 1100 Area, southern rail connection and rolling stock to a non-federal entity. Impact information contained herein will be used by the U.S. Department of Energy, Richland Operations Office Manager, to determine if the proposed action is a major federal action significantly affecting the quality of the human environment. If the proposed action is determined to be major and significant, an environmental impact statement will be prepared. If the proposed action is determined not to be major and significant, a Finding of No Significant Impact (FONSI) will be issued and the action can proceed. Criteria used to evaluate significance can be found in Title 40, Code of Federal Regulations (CFR) 1508.27. This EA was prepared in compliance with the ''National Environmental Policy Act'' (NEPA) of 1969, as amended, the Council on Environmental Quality (CEQ) Regulations for Implementing the Procedural Provisions of NEPA (40 CFR 1500-1508), and the U.S. Department of Energy Implementing Procedures for NEPA (10 CFR 1021). The following is a description of each section of the EA. (1) Purpose and Need for Action. This provides a brief statement concerning the problem or opportunity the U.S. Department of Energy is addressing with the proposed action. As necessary, background information is provided. (2) Description of the Proposed Action. A description with sufficient detail to identify potential environmental impacts is provided. (3) Alternatives to the Proposed Action. Reasonable alternative actions, which would address the Purpose and Need, are described. A no action alternative, as required by 10 CFR 1021, also is described. (4) Affected Environment. This provides a brief description of the locale in which the proposed action takes place, and which may be environmentally

  13. National Nuclear Waste Policy Act of 1981. Hearings before the Committee on Environment and Public Works, United States Senate, Ninety-Seventh Congress, First Session on S. 1662, October 31, 1981, Richland, Washington; November 9, 1981, Washington, DC

    International Nuclear Information System (INIS)

    Anon.

    1982-01-01

    Hearings were held on October 31, 1981 in Richland, Washington and on November 9, 1981 in Washington, DC to discuss the effort in S. 1662 to establish a national policy and an environmentally acceptable program for managing nuclear wastes from domestic commercial activities. The Richland hearing was held in recognition that Washington State will bear the major impact of the legislation. Witnesses at the Washington, DC hearing included officials from states that are potential sites for radioactive waste storage and disposal facilities. The hearing record includes the testimony of 16 witnesses in Richland and seven in Washington, DC, followed by a reprint of S. 1662 and additional material submitted for the record

  14. Lead test assembly irradiation and analysis Watts Bar Nuclear Plant, Tennessee and Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1997-07-01

    The U.S. Department of Energy (DOE) needs to confirm the viability of using a commercial light water reactor (CLWR) as a potential source for maintaining the nation's supply of tritium. The Proposed Action discussed in this environmental assessment is a limited scale confirmatory test that would provide DOE with information needed to assess that option. This document contains the environmental assessment results for the Lead test assembly irradiation and analysis for the Watts Bar Nuclear Plant, Tennessee, and the Hanford Site in Richland, Washington

  15. US Department of Energy, Richland Operations Office Integrated Safety Management System Program Description

    International Nuclear Information System (INIS)

    SHOOP, D.S.

    2000-01-01

    The purpose of this Integrated Safety Management System (ISMS) Program Description (PD) is to describe the U.S. Department of Energy (DOE), Richland Operations Office (RL) ISMS as implemented through the RL Integrated Management System (RIMS). This PD does not impose additional requirements but rather provides an overview describing how various parts of the ISMS fit together. Specific requirements for each of the core functions and guiding principles are established in other implementing processes, procedures, and program descriptions that comprise RIMS. RL is organized to conduct work through operating contracts; therefore, it is extremely difficult to provide an adequate ISMS description that only addresses RL functions. Of necessity, this PD contains some information on contractor processes and procedures which then require RL approval or oversight

  16. Tank Waste Remediation System, Hanford Site, Richland, Washington. Final Environmental Impact Statement. Volume II

    International Nuclear Information System (INIS)

    1996-08-01

    This document, Volume 2, provides the inventory of waste addressed in this Final Environmental Impact Statement (EIS) for the Tank Waste Remediation System, Hanford Site, Richland, Washington. The inventories consist of waste from the following four groups: (1) Tank waste; (2) Cesium (Cs) and Strontium (Sr) capsules; (3) Inactive miscellaneous underground storage tanks (MUSTs); and (4) Anticipated future tank waste additions. The major component by volume of the overall waste is the tank waste inventory (including future tank waste additions). This component accounts for more than 99 percent of the total waste volume and approximately 70 percent of the radiological activity of the four waste groups identified previously. Tank waste data are available on a tank-by-tank basis, but the accuracy of these data is suspect because they primarily are based on historical records of transfers between tanks rather than statistically based sampling and analyses programs. However, while the inventory of any specific tank may be suspect, the overall inventory for all of the tanks combined is considered more accurate. The tank waste inventory data are provided as the estimated overall chemical masses and radioactivity levels for the single-shell tanks (SSTs) and double-shell tanks (DSTs). The tank waste inventory data are broken down into tank groupings or source areas that were developed for analyzing groundwater impacts

  17. Measurement of spatial and temporal variation in volatile hazardous air pollutants in Tacoma, Washington, using a mobile membrane introduction mass spectrometry (MIMS) system.

    Science.gov (United States)

    Davey, Nicholas G; Fitzpatrick, Cole T E; Etzkorn, Jacob M; Martinsen, Morten; Crampton, Robert S; Onstad, Gretchen D; Larson, Timothy V; Yost, Michael G; Krogh, Erik T; Gilroy, Michael; Himes, Kathy H; Saganić, Erik T; Simpson, Christopher D; Gill, Christopher G

    2014-09-19

    The objective of this study was to use membrane introduction mass spectrometry (MIMS), implemented on a mobile platform, in order to provide real-time, fine-scale, temporally and spatially resolved measurements of several hazardous air pollutants. This work is important because there is now substantial evidence that fine-scale spatial and temporal variations of air pollutant concentrations are important determinants of exposure to air pollution and adverse health outcomes. The study took place in Tacoma, WA during periods of impaired air quality in the winter and summer of 2008 and 2009. Levels of fine particles were higher in winter compared to summer, and were spatially uniform across the study area. Concentrations of vapor phase pollutants measured by membrane introduction mass spectrometry (MIMS), notably benzene and toluene, had relatively uniform spatial distributions at night, but exhibited substantial spatial variation during the day-daytime levels were up to 3-fold higher at traffic-impacted locations compared to a reference site. Although no direct side-by-side comparison was made between the MIMS system and traditional fixed site monitors, the MIMS system typically reported higher concentrations of specific VOCs, particularly benzene, ethylbenzene and naphthalene, compared to annual average concentrations obtained from SUMA canisters and gas chromatographic analysis at the fixed sites.

  18. Westinghouse Hanford Company environmental surveillance annual report -- 200/600 Areas

    International Nuclear Information System (INIS)

    Schmidt, J.W.; Huckfeldt, C.R.; Johnson, A.R.; McKinney, S.M.

    1990-06-01

    This document presents the results of near-field environmental surveillance as performed by Westinghouse Hanford Company in 1989 for the Operations Area of the Hanford Site, Richland, Washington. These activities were conducted in the 200 and 600 Areas to assess operational control on the work environment. Surveillance activities included external radiation measurements and radiological surveys of waste disposal sites, radiological control areas, and roads, as well as sampling and analysis of ambient air, surface water, groundwater, sediments, soil, and biota. 15 refs., 3 figs., 1 tab

  19. Environmental Monitoring Plan United States Department of Energy Richland Operations Office. Revision 2

    International Nuclear Information System (INIS)

    1997-01-01

    This Environmental Monitoring Plan was prepared for the US Department of Energy's (DOE's) Richland Operations Office (RL) to implement the requirements of DOE Order 5400.1. According to the Order, each DOE site, facility, or activity that uses, generates, releases, or manages significant pollutants or hazardous materials shall prepare a written environmental monitoring plan covering two major activities: (1) effluent monitoring and (2) environmental surveillance. The plan is to contain information discussing the rationale and design criteria for the monitoring programs, sampling locations and schedules, quality assurance requirements, program implementation procedures, analytical procedures, and reporting requirements. The plan's purpose is to assist DOE in the management of environmental activities at the Hanford Site and to help ensure that operations on the site are conducted in an environmentally safe and sound manner

  20. Environmental Monitoring Plan United States Department of Energy Richland Operations Office. Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-11-10

    This Environmental Monitoring Plan was prepared for the US Department of Energy`s (DOE`s) Richland Operations Office (RL) to implement the requirements of DOE Order 5400.1. According to the Order, each DOE site, facility, or activity that uses, generates, releases, or manages significant pollutants or hazardous materials shall prepare a written environmental monitoring plan covering two major activities: (1) effluent monitoring and (2) environmental surveillance. The plan is to contain information discussing the rationale and design criteria for the monitoring programs, sampling locations and schedules, quality assurance requirements, program implementation procedures, analytical procedures, and reporting requirements. The plan`s purpose is to assist DOE in the management of environmental activities at the Hanford Site and to help ensure that operations on the site are conducted in an environmentally safe and sound manner.

  1. Tank Waste Remediation System, Hanford Site, Richland, Washington. Final Environmental Impact Statement. Volume VI

    International Nuclear Information System (INIS)

    1996-08-01

    The U.S. Department Of Energy and the Washington State Department of Ecology added Appendix L (Volume 6), Response to Public Comments, to the Tank Waste Remediation System (TWRS) Final Environmental Impact Statement (EIS) for the Hanford Site, Richland, Washington, to fully address and respond to public comments on the Draft EIS. In addition, DOE considered public comments, along with other factors such as programmatic need, short- and long-term impacts, technical feasibility, and cost, in arriving at DOE's preferred alternative. During the public comment period for the Draft EIS, more than 350 individuals, agencies, Tribal Nations, and organizations provided comments. This volume represents a broad spectrum of private citizens; businesses; local, State, and Federal officials; Tribal Nations; and public interest groups

  2. Remedial investigation for the 200-BP-1 operable unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    Buckmaster, M.A.

    1991-01-01

    The Hanford Site, Richland, Washington, contains over 1500 identified waste sites that will be characterized and remediated over the next 30 years. In support of the ''Hanford Federal Facility Agreement and Consent Order,'' the US Department of Energy has initiated a remedial investigation/feasibility study (RI/FS) at the 200-BP-1 operable unit. The 200-BP-1 RI is the first Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) investigation on the Hanford Site that involves drilling into highly radioactive and chemically contaminated soils. The initial phase of the site characterization is oriented toward determining the nature and extent of any contamination present in the vicinity of the 200-BP-1 operable unit. The major focus of the Phase I RI is the drilling and sampling of 10 inactive waste disposal units which received low level radioactive liquid waste

  3. A Fisheries Evaluation of the Richland and Wapato Canal Fish Screening Facilities, Spring 1987 : Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Neitzel, Duane A.; Abernethy, C.Scott; Lusty, E.William; Wampler, Sally J.

    1988-02-01

    We evaluated the effectiveness of new fish screening facilities at the Richland and Wapato canals in south-central Washington State. The screen integrity tests at the Richland Screens indicated that 100% of fall chinook salmon fry (Oncorhynchus tshawytscha) released in front of the screens were prevented from entering the canal behind the screens. Our estimate is based on a 61% catch efficiency for control fish planted behind the screens. At the Wapato Canal, we estimated that between 3% and 4% of the test fish were either impinged on the screen surface and passed over the screens or passed through faulty screen seals. Our estimate is based over the screens or passed through faulty screen seals. Our estimate is based on a greater than 90% capture of control fish released in front of the screens. At the Wapato Screens, we estimated that 0.8% of steelhead smolts (Salmo gairdneri) and 1.4% of spring chinook salmon smolts released during low canal flow tests wee descaled. During full canal flow tests, 1.6% of the steelhead and 3.1% of the spring chinook salmon released were descaled. The fish return pipe at the Wapato Canal was tested: the estimate of descaled test fish wa not different from the estimate of descaled control fish. The time required for fish to exit from the Wapato Screen forebay varied with species and with canal flow. During low canal flows, 43.2% of steelhead and 61.6% of spring chinook salmon smolts released at the trash racks were captured in the fish return within 96 hr. 11 refs., 11 figs., 10 tabs.

  4. Environmental assessment for the salvage/demolition of 200 West Area, 200 East Area, and 300 Area steam plants

    International Nuclear Information System (INIS)

    1996-10-01

    This environmental assessment has been prepared to assess potential environmental impacts associated with the US Department of Energy's proposed action: the salvage/demolition of the 200 West Area, 200 East Area, and 300 Area Steam Plants and steam distribution piping. Impact information will be used by the US Department of Energy, Richland Operations Office Manager, to determine if the proposed action is a major federal action significantly affecting the quality of the human environment. If the proposed action is determined to be major and significant, an environmental impact statement will be prepared. If the proposed action is determined not to be major and significant, a Finding of No Significant Impact (FONSI) will be issued and the action can proceed. The proposed action involves the salvage and demolition of the 200 West Area, 200 East Are, and 300 Area steam plants and their associated steam distribution piping, equipment, and ancillary facilities. Activities include the salvaging and recycling of all materials, wastes, and equipment where feasible, with waste minimization efforts utilized

  5. 200 Areas soil remediation strategy -- Environmental Restoration Program

    International Nuclear Information System (INIS)

    1996-09-01

    The remediation and waste management activities in the 200 Areas of the Hanford Site (located in Richland, Washington) currently range from remediating groundwater, remediating source units (contaminated soils), decontaminating and decommissioning of buildings and structures, maintaining facilities, managing transuranic, low-level and mixed waste, and operating tank farms that store high-level waste. This strategy focuses on the assessment and remediation of soil that resulted from the discharge of liquids and solids from processing facilities to the ground (e.g., ponds, ditches, cribs, burial grounds) in the 200 Areas and addresses only those waste sites assigned to the Environmental Restoration Program

  6. Storage for the Fast Flux Test Facility unirradiated fuel in the Plutonium Finishing Plant Complex, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1992-01-01

    This Environmental Assessment evaluates the proposed action to relocate and store unirradiated Fast Flux Test Facility fuel in the Plutonium Finishing Plant Complex on the Hanford Site, Richland, Washington. The US Department of Energy has decided to cease fuel fabrication activities in the 308 Building in the 300 Area. This decision was based on a safety concern over the ability of the fuel fabrication portion of the 308 Building to withstand a seismic event. The proposed action to relocate and store the fuel is based on the savings that could be realized by consolidating security costs associated with storage of the fuel. While the 308 Building belowgrade fuel storage areas are not at jeopardy by a seismic event, the US Department of Energy is proposing to cease storage operations along with the related fabrication operations. The US Department of Energy proposes to remove the unirradiated fuel pins and fuel assemblies from the 308 Building and store them in Room 192A, within the 234-5Z Building, a part of the Plutonium Finishing Plant Complex, located in the 200 West Area. Minor modifications to Room 192A would be required to accommodate placement of the fuel. The US Department of Energy estimates that removing all of the fuel from the 308 Building would save $6.5 million annually in security expenditures for the Fast Flux Test Facility. Environmental impacts of construction, relocation, and operation of the proposed action and alternatives were evaluated. This evaluation concluded that the proposed action would have no significant impacts on the human environment

  7. Safety assessment for proposed pump mixing operations to mitigate episodic gas releases in tank 241-101-SY: Hanford Site, Richland, Washington

    Energy Technology Data Exchange (ETDEWEB)

    Lentsch, J.W., Westinghouse Hanford

    1996-05-16

    This safety assessment addresses each of the elements required for the proposed action to remove a slurry distributor and to install, operate, and remove a mixing pump in Tank 241-SY-101, which is located within the Hanford Site, Richland, Washington. The proposed action is required as part of an ongoing evaluation of various mitigation concepts developed to eliminate episodic gas releases that result in hydrogen concentrations in the tank dome space that exceed the lower flammability limit.

  8. Potential Use Of Activated Carbon To Recover Tc-99 From 200 West Area Groundwater As An Alternative To More Expensive Resins Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    Byrnes, M.E.; Rossi, A.J.; Tortoso, A.C.

    2009-01-01

    Recent treatability testing performed on groundwater at the 200-ZP-1 Operable Unit at the Hanford Site in Richland, Washington, has shown that Purolite(reg s ign) A530E resin very effectively removes Tc-99 from groundwater. However, this resin is expensive and cannot be regenerated. In an effort to find a less expensive method for removing Tc-99 from the groundwater, a literature search was performed. The results indicated that activated carbon may be used to recover technetium (as pertechnetate, TCO 4 - ) from groundwater. Oak Ridge National Laboratory used activated carbon in both batch adsorption and column leaching studies. The adsorption study concluded that activated carbon absorbs TCO 4 - selectively and effectively over a wide range of pH values and from various dilute electrolyte solutions ( 4 - . Since activated carbon is much less expensive than Purolite A530E resin, it has been determined that a more extensive literature search is warranted to determine if recent studies have reached similar conclusions, and, if so, pilot testing of 200-ZP-1 groundwater wi11 likely be implemented. It is possible that less expensive, activated carbon canisters could be used as pre-filters to remove Tc-99, followed by the use of the more expensive Purolite A530E resin as a polishing step.

  9. United States Department of Energy Richland Field Office Environmental Protection Implementation Plan, November 9, 1991--November 9, 1992

    International Nuclear Information System (INIS)

    1992-02-01

    The US Department of Energy (DOE) Order 5400.1 (DOE 1988a), General Environmental Protection Program, establishes environmental protection program requirements, authorities, and responsibilities to ensure that DOE operations are in compliance with applicable Federal, State and local environmental protection laws and regulations, executive orders, and internal department policies. Chapter 3 of DOE Order 5400.1 requires that each DOE Field Office prepare a plan for implementing the requirements of this order and update the plan annually. Therefore, this update to the US Department of Energy -- Richland Operations Office Environmental Protection Implementation Plan (DOE-RL 1989a), initially prepared November 9, 1989, is being issued

  10. United States Department of Energy Richland Field Office Environmental Protection Implementation Plan, November 9, 1992--November 9, 1993

    International Nuclear Information System (INIS)

    1992-11-01

    The US Department of Energy (DOE) Order 5400.1 (DOE 1988a), General Environmental Protection Program, establishes environmental protection program requirements, authorities, and responsibilities to ensure that DOE operations are in compliance with applicable Federal, State and local environmental protection laws and regulations, executive orders, and internal department policies. Chapter 3 of DOE Order 5400.1 requires that each DOE Field Office prepare a plan for implementing the requirements of this order and update the plan annually. This update to the US Department of Energy-Richland Operations Office Environmental Protection Implementation Plan (DOE-RL 1989a), initially prepared November 9, 1989, is being issued to comply with the order

  11. A safety assessment for proposed pump mixing operations to mitigate episodic gas releases in tank 241-SY-101: Hanford Site,Richland, Washington

    Energy Technology Data Exchange (ETDEWEB)

    Lentsch, J.W.

    1996-07-01

    This safety assessment addresses each of the elements required for the proposed action to remove a slurry distributor and to install, operate, and remove a mixing pump in Tank 241-SY-101,which is located within the Hanford Site, Richland, Washington.The proposed action is required as part of an ongoing evaluation of various mitigation concepts developed to eliminate episodic gas releases that result in hydrogen concentrations in the tank dome space that exceed the lower flammability limit.

  12. Sludge stabilization at the Plutonium Finishing Plant, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1994-10-01

    This Environmental Assessment evaluates the proposed action to operate two laboratory-size muffle furnaces in glovebox HC-21C, located in the Plutonium Finishing Plant (PFP), Hanford Site, Richland, Washington. The muffle furnaces would be used to stabilize chemically reactive sludges that contain approximately 25 kilograms (55 pounds) of plutonium by heating to approximately 500 to 1000 degrees C (900 to 1800 degrees F). The resulting stable powder, mostly plutonium oxide with impurities, would be stored in the PFP vaults. The presence of chemically reactive plutonium-bearing sludges in the process gloveboxes poses a risk to workers from radiation exposure and limits the availability of storage space for future plant cleanup. Therefore, there is a need to stabilize the material into a form suitable for long-term storage. This proposed action would be an interim action, which would take place prior to completion of an Environmental Impact Statement for the PFP which would evaluate stabilization of all plutonium-bearing materials and cleanout of the facility. However, only 10 percent of the total quantity of plutonium in reactive materials is in the sludges, so this action will not limit the choice of reasonable alternatives or prejudice the Record of Decision of the Plutonium Finishing Plant Environmental Impact Statement

  13. Evaluation of injury/illness recordkeeping pilot course taught in Richland, Washington, January 15, 1992

    Energy Technology Data Exchange (ETDEWEB)

    Wright, T.S.

    1992-03-01

    This section summarizes trainee evaluations for the Safety Training Section course, Injury/Illness Recordkeeping which was conducted January 15, at Hanford, in Richland Washington. This class was the first pilot course taught. This class was designed to acquaint attendees with DOE orders 5484.1, 5484.1A, draft 3 and the OSHA regulations found in 29 CFR 1904. This goal was partially achieved; the section pertaining to DOE orders must be improve prior to the next pilot class. Section 1.1 and 1.2 of this report summarize the quantitative course evaluations that trainees provided upon completion of the course. Appendix A provides a transcript of the trainees` written comments. Numeric course ratings were generally positive and show that the course material and instruction were very effective. Written comments supported the positive numeric ratings. The course content and knowledge gained by the trainees exceeded most of the students` expectations of the course. Results from the final examination showed that students gained significant knowledge from the course.

  14. Environmental assessment for Trench 33 widening in 218-W-5 Low-Level Burial Ground, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1997-07-01

    This environmental assessment (EA) has been prepared to assess potential environmental impacts associated with the US Department of Energy''s proposed action: to widen and operated the unused Trench 33 in the 218-W-5 Low-Level Burial Ground. Information contained herein will be used by the US Department of Energy, Richland Operations Office Manager, to determine if the Proposed Action is a major federal action significantly affecting the quality of the human environment. If the Proposed Action is determined to be major and significant, an environmental impact statement will be prepared. If the Proposed Action is determined not to be major and significant, a Finding of No significant Impact will be issued and the action may proceed

  15. Environmental assessment for Trench 33 widening in 218-W-5 Low-Level Burial Ground, Hanford Site, Richland, Washington

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-07-01

    This environmental assessment (EA) has been prepared to assess potential environmental impacts associated with the US Department of Energy`s proposed action: to widen and operated the unused Trench 33 in the 218-W-5 Low-Level Burial Ground. Information contained herein will be used by the US Department of Energy, Richland Operations Office Manager, to determine if the Proposed Action is a major federal action significantly affecting the quality of the human environment. If the Proposed Action is determined to be major and significant, an environmental impact statement will be prepared. If the Proposed Action is determined not to be major and significant, a Finding of No significant Impact will be issued and the action may proceed.

  16. Z plant aggregate area management study technical baseline report

    International Nuclear Information System (INIS)

    DeFord, D.H.; Carpenter, R.W.

    1995-05-01

    This document was prepared in support of the development of a Aggregate Area Management Study of Z Plant, 200 West Area, at the US Department of Energy (DOE) Hanford Site near Richland, Washington. It provides a technical description and operational history of the aggregate area and results from an environmental investigation undertaken by the Technical Baseline Section of the Environmental Engineering Group, Westinghouse Hanford Company (WHC) which is currently the Waste Site and Facility Research Office, Natural Resources, Bechtel Hanford, Inc. (BHI). It is based upon review and evaluation of numerous Hanford Site current and historical reports, drawings and photographs, supplemented with site inspections and employee interviews. No intrusive field investigations or sampling were conducted in support of this report

  17. Engineering evaluation/cost analysis for 100-N area waste

    International Nuclear Information System (INIS)

    Mihalik, L.A.

    1996-08-01

    The 100 Area of the Hanford Site was placed on the U.S. Environmental Protection Agency's National Priorities List (NPL) in November 1989 under the 'Comprehensive Environmental Response, Compensation, and Liability Act of 1980.' The 100 Area NPL site includes the 100-N Area, which is in the early stages of the cleanup process. To facilitate the disposal of wastes generated in preparation for cleanup, the U.S. Department of Energy, Richland Operations Office in cooperation with the Washington State Department of Ecology and the U.S. Environmental Protection Agency, has prepared this Engineering Evaluation/Cost Analysis (EE/CA). The scope of this EE/CA includes wastes from cleanout of the EDB and deactivation facilities. Volumes and costs for disposal of investigation-derived waste are also included

  18. State waste discharge permit application 400 Area secondary cooling water. Revision 2

    International Nuclear Information System (INIS)

    1996-01-01

    This document constitutes the Washington Administrative Code 173-216 State Waste Discharge Permit Application that serves as interim compliance as required by Consent Order DE 91NM-177, for the 400 Area Secondary Cooling Water stream. As part of the Hanford Federal Facility Agreement and Consent Order negotiations, the US Department of Energy, Richland Operations Office, the US Environmental Protection Agency, and the Washington State Department of Ecology agreed that liquid effluent discharges to the ground on the Hanford Site that affect groundwater or have the potential to affect groundwater would be subject to permitting under the structure of Chapter 173-216 of the Washington Administrative Code, the State Waste Discharge Permitting Program. As a result of this decision, the Washington State Department of Ecology and the US Department of Energy, Richland Operations Office entered into Consent Order DE 91NM-177. The Consent Order DE 91NM-177 requires a series of permitting activities for liquid effluent discharges. Based upon compositional and flow rate characteristics, liquid effluent streams on the Hanford Site have been categorized into Phase 1, Phase 2, and Miscellaneous streams. This document only addresses the 400 Area Secondary Cooling Water stream, which has been identified as a Phase 2 stream. The 400 Area Secondary Cooling Water stream includes contribution streams from the Fuels and Materials Examination Facility, the Maintenance and Storage Facility, the 481-A pump house, and the Fast Flux Test Facility

  19. Evaluation of injury/illness recordkeeping pilot course taught in Richland, Washington, January 15, 1992

    Energy Technology Data Exchange (ETDEWEB)

    Wright, T.S.

    1992-03-01

    This section summarizes trainee evaluations for the Safety Training Section course, Injury/Illness Recordkeeping which was conducted January 15, at Hanford, in Richland Washington. This class was the first pilot course taught. This class was designed to acquaint attendees with DOE orders 5484.1, 5484.1A, draft 3 and the OSHA regulations found in 29 CFR 1904. This goal was partially achieved; the section pertaining to DOE orders must be improve prior to the next pilot class. Section 1.1 and 1.2 of this report summarize the quantitative course evaluations that trainees provided upon completion of the course. Appendix A provides a transcript of the trainees' written comments. Numeric course ratings were generally positive and show that the course material and instruction were very effective. Written comments supported the positive numeric ratings. The course content and knowledge gained by the trainees exceeded most of the students' expectations of the course. Results from the final examination showed that students gained significant knowledge from the course.

  20. Status of ground water in the 1100 Area

    International Nuclear Information System (INIS)

    Law, A.G.

    1990-12-01

    This document contains the results of monthly sampling of 1100 Area Wells and ground water monitoring. Included is a table that presents all of the results of monthly sampling and analyses between April 1989 and May 1990, for four constituents selected to be most indicative of the potential for contamination from US Department of Energy facilities. The samples were collected from the three wells near the city of Richland well field. Also included is a table that presents a listing of the analytical results from sampling and analyses of five wells between April 1989, and May 1990 in the 1100 Area. The detection limit and drinking water standards or maximum contaminant level are also listed in the tables for each constituent

  1. S Plant Aggregate Area Management study technical baseline report

    International Nuclear Information System (INIS)

    DeFord, D.H.; Carpenter, R.W.

    1995-05-01

    This document is prepared in support of an Aggregate Area Management Study of S Plant, 200 West Area, at the US Department of Energy's (DOE) Hanford Site near Richland, Washington. It provides a technical baseline of the aggregate area and the results from an environmental investigation undertaken by the Technical Baseline Section of the Environmental Engineering Group, Westinghouse Hanford Company (WHC). This document is based on review and evaluation of numerous Hanford Site current and historical reports, drawings and photographs, supplemented with site inspections and employee interviews. This report describes the REDOX facility and its waste sites, including cribs, french drains, septic tanks and drain fields, trenches, catch tanks, settling tanks, diversion boxes, underground tank farms designed for high-level liquid wastes, and the lines and encasements that connect them

  2. 1997-1998 Annual Review of the 200 West and 200 East area performance assessments

    International Nuclear Information System (INIS)

    WOOD, M.I.

    1999-01-01

    An annual review of the 200 West and 200 East Area Performance Assessment (PA) analyses for fiscal year 1998 was completed. Burial ground disposal operations were found to be compliant with performance objectives in DOE Order 5820.2A. Other newly generated information and analyses relevant to PA assumptions and results were summarized. This report was initially submitted to the Department of Energy-Richland Office (DOE-RL) as a letter report in October, 1998

  3. B Plant Complex generator dangerous waste storage areas inspection plan: Revision 1

    International Nuclear Information System (INIS)

    Beam, T.G.

    1994-01-01

    This document contains the inspection plan for the <90 day dangerous/mixed waste storage areas and satellite accumulation areas at B Plant Complex. This inspection plan is designed to comply with all applicable federal, state and US Department of Energy-Richland Operations Office training requirements. In particular, the requirements of WAC 173-303 ''Dangerous Waste Regulations'' are met by this inspection plan. This inspection plan is designed to provide B Plant Complex with the records and documentation showing that the waste storage and handling program is in compliance with applicable regulations. The plan also includes the requirements for becoming a qualified inspector of waste storage areas and the responsibilities of various individuals and groups at B Plant Complex

  4. 78 FR 57925 - Ferroequus Railway Company Limited and Railstuff, LLC-Lease and Operation Exemption-City of...

    Science.gov (United States)

    2013-09-20

    ... Company Limited and Railstuff, LLC--Lease and Operation Exemption--City of Tacoma, d/b/a Tacoma Rail... City of Tacoma, d/b/a Tacoma Rail Mountain Division (TRMD), and to operate, pursuant to a lease... state that the line connects with a TRMD line over which TMRD provides common carrier service between...

  5. 300 Area dangerous waste tank management system: Compliance plan approach. Final report

    International Nuclear Information System (INIS)

    1996-03-01

    In its Dec. 5, 1989 letter to DOE-Richland (DOE-RL) Operations, the Washington State Dept. of Ecology requested that DOE-RL prepare ''a plant evaluating alternatives for storage and/or treatment of hazardous waste in the 300 Area...''. This document, prepared in response to that letter, presents the proposed approach to compliance of the 300 Area with the federal Resource Conservation and Recovery Act and Washington State's Chapter 173-303 WAC, Dangerous Waste Regulations. It also contains 10 appendices which were developed as bases for preparing the compliance plan approach. It refers to the Radioactive Liquid Waste System facilities and to the radioactive mixed waste

  6. Steam Generator Tube Integrity Program: Surry Steam Generator Project, Hanford site, Richland, Benton County, Washington: Environmental assessment

    International Nuclear Information System (INIS)

    1980-03-01

    The US Nuclear Regulatory Commission (NRC) has placed a Nuclear Regulatory Research Order with the Richland Operations Office of the US Department of Energy (DOE) for expanded investigations at the DOE Pacific Northwest Laboratory (PNL) related to defective pressurized water reactor (PWR) steam generator tubing. This program, the Steam Generator Tube Integrity (SGTI) program, is sponsored by the Metallurgy and Materials Research Branch of the NRC Division of Reactor Safety Research. This research and testing program includes an additional task requiring extensive investigation of a degraded, out-of-service steam generator from a commercial nuclear power plant. This comprehensive testing program on an out-of-service generator will provide NRC with timely and valuable information related to pressurized water reactor primary system integrity and degradation with time. This report presents the environmental assessment of the removal, transport, and testing of the steam generator along with decontamination/decommissioning plans

  7. Nevada Test Site Area 25. Radiological survey and cleanup project, 1974-1983. Final report

    International Nuclear Information System (INIS)

    McKnight, R.K.; Rosenberry, C.E.; Orcutt, J.A.

    1984-01-01

    This report describes radiological survey, decontamination and decommissioning of the Nevada Test Site (NTS) Area 25 facilities and land areas incorporated in the Nuclear Rocket Development Station (NRDS). Buildings, facilities and support systems used after 1959 for nuclear reactor and engine testing were surveyed for the presence of radioactive contamination. The cleanup was part of the Surplus Facilities Management Program funded by the Department of Energy's Richland Operations Office. The radiological survey portion of the project encompassed portable instrument surveys and removable contamination surveys (swipe) for alpha and beta plus gamma radiation contamination of facilities, equipment and land areas. Soil sampling was also accomplished. The majority of Area 25 facilities and land areas have been returned to unrestricted use. Remaining radiologically contaminated areas are posted with warning signs and barricades. 12 figures

  8. Summary of radioactive solid waste received in the 200 Areas during calendar year 1993

    International Nuclear Information System (INIS)

    Anderson, J.D.; Hagel, D.L.

    1994-09-01

    Westinghouse Hanford Company manages and operates the Hanford Site 200 Areas radioactive solid waste storage and disposal facilities for the US Department of Energy, Richland Operations Office. These facilities include radioactive solid waste disposal sites and radioactive solid waste storage areas. This document summarizes the amount of radioactive materials that have been buried and stored in the 200 Areas radioactive solid waste storage and disposal facilities since startup in 1944 through calendar year 1993. This report does not include backlog waste, solid radioactive waste in storage or disposed of in other areas, or facilities such as the underground tank farms. Unless packaged within the scope of WHC-EP-0063, ''Hanford Site Solid Waste Acceptance Criteria,'' (WHC 1988), liquid waste data are not included in this document

  9. Masters Thesis- Criticality Alarm System Design Guide with Accompanying Alarm System Development for the Radioisotope Production Laboratory in Richland, Washington

    Energy Technology Data Exchange (ETDEWEB)

    Greenfield, Bryce A. [Univ. of New Mexico, Albuquerque, NM (United States)

    2009-12-01

    A detailed instructional manual was created to guide criticality safety engineers through the process of designing a criticality alarm system (CAS) for Department of Energy (DOE) hazard class 1 and 2 facilities. Regulatory and technical requirements were both addressed. A list of design tasks and technical subtasks are thoroughly analyzed to provide concise direction for how to complete the analysis. An example of the application of the design methodology, the Criticality Alarm System developed for the Radioisotope Production Laboratory (RPL) of Richland, Washington is also included. The analysis for RPL utilizes the Monte Carlo code MCNP5 for establishing detector coverage in the facility. Significant improvements to the existing CAS were made that increase the reliability, transparency, and coverage of the system.

  10. Environmental restoration and waste management site-specific plan for Richland Operations Office

    International Nuclear Information System (INIS)

    1991-09-01

    This document was prepared to implement and support the US Department of Energy-Headquarters (DOE-HQ) national plan. The national plan, entitled Environmental Restoration and Waste Management Five-Year Plan (DOE 1990b) (hereinafter referred to as the DOE-HQ Five-Year Plan) is the cornerstone of the US Department of Energy's (DOE) long-term strategy in environmental restoration and waste management. The DOE-HQ Five-Year Plan addresses overall philosophy and environmental and waste-related activities under the responsibilities of the DOE Office of Environmental Restoration and Waste Management. The plan also reaffirms DOE-HQ goals to bring its nuclear sites into environmental compliance in cooperation with its regulators and the public, and to clean up and restore the environment by 2019 (the commitment for the Hanford Site is for one year sooner, or 2018). This document is part of the site-specific plan for the US Department of Energy-Richland Operations Office (DOE-RL). It is the first revision of the original plan, which was dated December 1989 (DOE-RL 1989a). This document is a companion document to the Overview of the Hanford Cleanup Five-Year Plan (DOE-RL 1989d) and The Hanford Site Environmental Restoration and Waste Management Five-Year Plan Activity Data Sheets (DOE-RL 1991). Although there are three documents that make up the complete DOE-RL plan, this detailed information volume was prepared so it could be used as a standalone document. 71 refs., 40 figs., 28 tabs

  11. Radiological dose assessment for the decontaminated concrete removed from 183-H solar evaporation basins at the Hanford site, Richland, Washington

    International Nuclear Information System (INIS)

    Kamboj, S.; Faillace, E.; Yu, C.

    1997-01-01

    Potential maximum radiation dose rates over a 1,000-year time horizon were calculated for exposure to the decontaminated concrete removed from the 183-H Solar Evaporation Basins at the Hanford Site, Richland, Washington. The RESRAD computer code, Version 5.62, which implements the methodology described in the US Department of Energy's manual for developing residual radioactive material guidelines, was used in this evaluation. Currently, the concrete is not being used. Four potential exposure scenarios were developed for the land area where the decontaminated concrete will be stored. In Scenario A industrial use of the land is assumed; in Scenario B recreational use of the land is assumed; in Scenario C residential use of the land is assumed; and in Scenario D (a plausible but unlikely land-use scenario), the presence of a subsistence farmer in the immediate vicinity of the land is assumed. For Scenarios A and B, water used for drinking is assumed to be surface water from the Columbia River; for Scenarios C and D, groundwater drawn from a well located at the downgradient edge of the storage area is the only source of water for drinking, irrigation, and raising livestock. Conservative parameters values were used to estimate the radiation doses. The results of the evaluation indicate that the US Department of Energy's dose limit of 100 mrem/yr would not be exceeded for any of the scenarios analyzed. The potential maximum dose rates for Scenarios A, B, C, and D are 0.75, 0.022, 29, 29 mrem/yr, respectively. An uncertainty analysis was performed to determine which parameters have the greatest impact on the estimated doses. The doses in Scenarios C and D were found to be very sensitive to the magnitude of the irrigation rate

  12. Summary of radioactive solid waste received in the 200 Areas during calendar year 1990

    International Nuclear Information System (INIS)

    Anderson, J.D.; McCann, D.C.; Poremba, B.E.

    1991-04-01

    Westinghouse Hanford Company manages and operates the Hanford Site 200 Areas radioactive solid waste storage and disposal facilities for the US Department of Energy-Richland Operations Office under contract AC06-87RL10930. These facilities include radioactive solid waste disposal sites and radioactive solid waste storage areas. This document summarizes the amount of radioactive materials that have been buried and stored in the 200 Areas radioactive solid waste storage and disposal facilities since startup in 1944 through calendar year 1990. This report does not include solid radioactive wastes in storage or disposal in other areas or facilities such as the underground tank farms. Unless packaged within the scope of Hanford Site radioactive solid waste acceptance criteria, liquid waste data are not included in this document. 10 refs., 1 tab

  13. Summary of radioactive solid waste received in the 200 areas during calendar year 1997

    International Nuclear Information System (INIS)

    Hagel, D.L.

    1998-01-01

    Waste Management Federal Services of Hanford Inc. manages and operates the Hanford Site 200 Area radioactive solid waste storage and disposal facilities for the US Department of Energy, Richland Operations Office under contract DE-AC06-87RL10930. These facilities include storage areas and disposal sites for radioactive solid waste. This document summarizes the amount of radioactive materials that have been buried and stored in the 200 Area radioactive solid waste storage and disposal facilities from startup in 1944 through calendar year 1997. This report does not include backlog waste, solid radioactive wastes in storage or disposed of in other areas, or facilities such as the underground tank farms. Unless packaged within the scope of WHC-EP-0063, Hanford Site Solid Waste Acceptance Cafeteria, liquid waste data are not included in this document

  14. Summary of radioactive solid waste received in the 200 Areas during calendar year 1992

    International Nuclear Information System (INIS)

    Anderson, J.D.; Hagel, D.L.

    1992-05-01

    Westinghouse Hanford Company manages and operates the Hanford Site 200 Area radioactive solid waste storage and disposal facilities for the US Department of Energy, Richland Field Office, under contract DE-AC06-87RL10930. These facilities include radioactive solid waste disposal sites and radioactive solid waste storage areas. This document summarizes the amount of radioactive materials that have been buried and stored in the 200 Area radioactive solid waste storage and disposal facilities since startup in 1944 through calendar year 1991. This report does not include solid radioactive wastes in storage or disposed of in other areas or facilities such as the underground tank farms, or backlog wastes. Unless packaged within the scope of WHC-EP-0063, Hanford Site Solid Waste Acceptance Criteria, (WHC 1988), liquid waste data are not included in this document

  15. Summary of radioactive solid waste received in the 200 Areas during calendar year 1994

    International Nuclear Information System (INIS)

    Anderson, J.D.; Hagel, D.L.

    1995-08-01

    Westinghouse Hanford Company manages and operates the Hanford Site 200 Area radioactive solid waste storage and disposal facilities for the US Department of Energy, Richland Field Office, under contract DE-AC06-87RL10930. These facilities include radioactive solid waste disposal sites and radioactive solid waste storage areas. This document summarizes the amount of radioactive material that has been buried and stored in the 200 Area radioactive solid waste storage and disposal facilities from startup in 1944 through calendar year 1994. This report does not include backlog waste: solid radioactive wastes in storage or disposed of in other areas or facilities such as the underground tank farms. Unless packaged within the scope of WHC-EP-0063, Hanford Site Solid Waste Acceptance Criteria (WHC 1988), liquid waste data are not included in this document

  16. Summary of radioactive solid waste received in the 200 Areas during calendar year 1994

    Energy Technology Data Exchange (ETDEWEB)

    Anderson, J.D.; Hagel, D.L.

    1995-08-01

    Westinghouse Hanford Company manages and operates the Hanford Site 200 Area radioactive solid waste storage and disposal facilities for the US Department of Energy, Richland Field Office, under contract DE-AC06-87RL10930. These facilities include radioactive solid waste disposal sites and radioactive solid waste storage areas. This document summarizes the amount of radioactive material that has been buried and stored in the 200 Area radioactive solid waste storage and disposal facilities from startup in 1944 through calendar year 1994. This report does not include backlog waste: solid radioactive wastes in storage or disposed of in other areas or facilities such as the underground tank farms. Unless packaged within the scope of WHC-EP-0063, Hanford Site Solid Waste Acceptance Criteria (WHC 1988), liquid waste data are not included in this document.

  17. Summary of radioactive solid waste received in the 200 areas during calendar year 1997

    Energy Technology Data Exchange (ETDEWEB)

    Hagel, D.L.

    1998-06-25

    Waste Management Federal Services of Hanford Inc. manages and operates the Hanford Site 200 Area radioactive solid waste storage and disposal facilities for the US Department of Energy, Richland Operations Office under contract DE-AC06-87RL10930. These facilities include storage areas and disposal sites for radioactive solid waste. This document summarizes the amount of radioactive materials that have been buried and stored in the 200 Area radioactive solid waste storage and disposal facilities from startup in 1944 through calendar year 1997. This report does not include backlog waste, solid radioactive wastes in storage or disposed of in other areas, or facilities such as the underground tank farms. Unless packaged within the scope of WHC-EP-0063, Hanford Site Solid Waste Acceptance Cafeteria, liquid waste data are not included in this document.

  18. Summary of radioactive solid waste received in the 200 areas during calendar year 1996

    Energy Technology Data Exchange (ETDEWEB)

    Hladek, K.L.

    1997-05-21

    Rust Federal Services of Hanford Inc. manages and operates the Hanford Site 200 Area radioactive solid waste storage and disposal facilities for the US Department of Energy, Richland Operations Office under contract DE-AC06-87RL10930. These facilities include storage areas and disposal sites for radioactive solid waste. This document summarizes the amount of radioactive materials that have been buried and stored in the 200 Area radioactive solid waste storage and disposal facilities from startup in 1944 through calendar year 1996. This report does not include backlog waste, solid radioactive wastes in storage or disposed of in other areas, or facilities such as the underground tank farms. Unless packaged within the scope of WHC-EP-0063, Hanford Site Solid Waste Acceptance Criteria, liquid waste data are not included in this document.

  19. Evaluation of the 183-D Water Filtration Facility for Bat Roosts and Development of a Mitigation Strategy, 100-D Area, Hanford Site

    Energy Technology Data Exchange (ETDEWEB)

    Lindsey, C. T.; Gano, K. A.; Lucas, J. G.

    2011-03-07

    The 183-D Water Filtration Facility is located in the 100-D Area of the Hanford Site, north of Richland, Washington. It was used to provide filtered water for cooling the 105-D Reactor and supplying fire-protection and drinking water for all facilities in the 100-D Area. The facility has been inactive since the 1980s and is now scheduled for demolition. Therefore, an evaluation was conducted to determine if any part of the facility was being used as roosting habitat by bats.

  20. Results of phase 1 groundwater quality assessment for Single-Shell Tank Waste Management Areas B-BX-BY at the Hanford Site

    Energy Technology Data Exchange (ETDEWEB)

    Narbutovskih, S.M.

    1998-02-01

    Pacific Northwest National Laboratory conducted a Phase 1 (or first determination) groundwater quality assessment for the US Department of Energy, Richland Operations Office, in accordance with the Federal Facility Compliance Agreement. The purpose of the assessment was to determine if the Single-Shell Tank Waste Management Area (WMA) B-BX-BY has impacted groundwater quality. This report will document the evidence demonstrating that the WMA has impacted groundwater quality.

  1. Results of phase 1 groundwater quality assessment for Single-Shell Tank Waste Management Areas B-BX-BY at the Hanford Site

    International Nuclear Information System (INIS)

    Narbutovskih, S.M.

    1998-02-01

    Pacific Northwest National Laboratory conducted a Phase 1 (or first determination) groundwater quality assessment for the US Department of Energy, Richland Operations Office, in accordance with the Federal Facility Compliance Agreement. The purpose of the assessment was to determine if the Single-Shell Tank Waste Management Area (WMA) B-BX-BY has impacted groundwater quality. This report will document the evidence demonstrating that the WMA has impacted groundwater quality

  2. Waste analysis plan for the 200 area effluent treatment facility and liquid effluent retention facility

    International Nuclear Information System (INIS)

    Ballantyne, N.A.

    1995-01-01

    This waste analysis plan (WAP) has been prepared for startup of the 200 Area Effluent Treatment Facility (ETF) and operation of the Liquid Effluent Retention Facility (LERF), which are located on the Hanford Facility, Richland, Washington. This WAP documents the methods used to obtain and analyze representative samples of dangerous waste managed in these units, and of the nondangerous treated effluent that is discharged to the State-Approved Land Disposal System (SALDS). Groundwater Monitoring at the SALDS will be addressed in a separate plan

  3. Neuroscientific Insights: Attention, Working Memory, and Inhibitory Control

    Science.gov (United States)

    Raver, C. Cybele; Blair, Clancy

    2016-01-01

    In this article, Cybele Raver and Clancy Blair explore a group of cognitive processes called executive function (EF)--including the flexible control of attention, the ability to hold information through working memory, and the ability to maintain inhibitory control. EF processes are crucial for young children's learning. On the one hand, they can…

  4. Fall 1998 200 East area biological vector contamination report

    International Nuclear Information System (INIS)

    CONNELL, D.J.

    1999-01-01

    The purpose of this report is to document the investigation into the cause of the spread of radioactive contamination in September and October 1998 at the Hanford Site's 200 East Area and its subsequent spread to the City of Richland Landfill; identify the source of the contamination; and present corrective actions. The focus and thrust of managing the incident was based on the need to accomplish the following, listed in order of importance: (1) protect the health and safety of the Site workers and the public; (2) contain and control the spread of contamination; (3) identify the source of contamination and the pathways for its spread; and (4) identify the causal factors enabling the contamination

  5. Fall 1998 200 East area biological vector contamination report

    Energy Technology Data Exchange (ETDEWEB)

    CONNELL, D.J.

    1999-03-17

    The purpose of this report is to document the investigation into the cause of the spread of radioactive contamination in September and October 1998 at the Hanford Site's 200 East Area and its subsequent spread to the City of Richland Landfill; identify the source of the contamination; and present corrective actions. The focus and thrust of managing the incident was based on the need to accomplish the following, listed in order of importance: (1) protect the health and safety of the Site workers and the public; (2) contain and control the spread of contamination; (3) identify the source of contamination and the pathways for its spread; and (4) identify the causal factors enabling the contamination.

  6. Summary of radioactive solid waste received in the 200 Areas during calendar year 1995

    International Nuclear Information System (INIS)

    Hladek, K.L.

    1996-01-01

    Westinghouse Hanford Company manages and operates the Hanford Site 200 Area radioactive solid waste storage and disposal facilities for the US Department of Energy, Richland Operations Office. These facilities include radioactive solid waste disposal sites and radioactive solid waste storage areas. This document summarizes the amount of radioactive materials that have been buried and stored in the 200 Area radioactive solid waste storage and disposal facilities since startup in 1944 through calendar year 1995. This report does not include backlog waste, solid radioactive wastes in storage or disposed of in other areas, or facilities such as the underground tank farms. Unless packaged within the scope of WHC-EP-0063, Hanford Site Solid Waste Acceptance Criteria, liquid waste data are not included in this document. This annual report provides a summary of the radioactive solid waste received in the both the 200-East and 200-West Areas during the calendar year 1995

  7. Summary of radioactive solid waste received in the 200 Areas during calendar year 1995

    Energy Technology Data Exchange (ETDEWEB)

    Hladek, K.L.

    1996-06-06

    Westinghouse Hanford Company manages and operates the Hanford Site 200 Area radioactive solid waste storage and disposal facilities for the US Department of Energy, Richland Operations Office. These facilities include radioactive solid waste disposal sites and radioactive solid waste storage areas. This document summarizes the amount of radioactive materials that have been buried and stored in the 200 Area radioactive solid waste storage and disposal facilities since startup in 1944 through calendar year 1995. This report does not include backlog waste, solid radioactive wastes in storage or disposed of in other areas, or facilities such as the underground tank farms. Unless packaged within the scope of WHC-EP-0063, Hanford Site Solid Waste Acceptance Criteria, liquid waste data are not included in this document. This annual report provides a summary of the radioactive solid waste received in the both the 200-East and 200-West Areas during the calendar year 1995.

  8. 78 FR 8063 - Safety Zones; Annual Firework Displays Within the Captain of the Port, Puget Sound Area of...

    Science.gov (United States)

    2013-02-05

    ... revised to read: latitude 48[deg] 08.413' N, longitude 122[deg] 45.531' W; Tacoma Freedom Fair... received without jeopardizing the safety or security of people, places or vessels. 7. Unfunded Mandates... private sector of $100,000,000 (adjusted for inflation) or more in any one year. Though this proposed rule...

  9. 78 FR 29023 - Safety Zones; Annual Firework Displays Within the Captain of the Port, Puget Sound Area of...

    Science.gov (United States)

    2013-05-17

    ... are revised to read: Latitude 48[deg]08.413[min] N, longitude 122[deg]45.531[min] W. Tacoma Freedom... or security of people, places or vessels. 7. Unfunded Mandates Reform Act The Unfunded Mandates... a State, local, or tribal government, in the aggregate, or by the private sector of $100,000,000...

  10. Access road from State Route 240 to the 200 West Area, Hanford Site, Richland, Washington: Environmental assessment

    Energy Technology Data Exchange (ETDEWEB)

    1994-02-01

    The US Department of Energy (DOE) proposes to construct an access road on the Hanford Site, from State Route (SR) 240 to Beloit Avenue in the 200 West Area. Traffic volume during shift changes creates an extremely serious congestion and safety problem on Route 4S from the Wye barricade to the 200 Areas. A Risk Evaluation (Trost 1992) indicated that there is a probability of 1.53 fatal accidents on Route 4S within 2 years. To help alleviate this danger, a new 3.5-kilometer (2.2-mile)-long access road would be constructed from Beloit Avenue in the 200 West Area to SR 240. In addition, administrative controls such as redirecting traffic onto alternate routes would be used to further reduce traffic volume. The proposed access road would provide an alternative travel-to-work route for many outer area personnel, particularly those with destinations in the 200 West Area. This proposal is the most reasonable alternative to reduce the problem. While traffic safety would be greatly improved, a small portion of the shrub-steppe habitat would be disturbed. The DOE would offset any habitat damage by re-vegetation or other appropriate habitat enhancement activities elsewhere on the Hanford Site. This Environmental Assessment (EA) provides information about the environmental impacts of the proposed action, so a decision can be made to either prepare an Environmental Impact Statement or issue a Finding of No Significant Impact.

  11. Environmental Assessment for the shipment of low enriched uranium billets to the United Kingdom from the Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1992-08-01

    This Environmental Assessment provides the necessary information so that a decision can be made on whether a Finding of No Significant Impact Environmental Impact Statement should be prepared for the proposed action. The proposed action is to transfer 2,592 low enriched uranium billets to the United Kingdom. The billets are currently stored in the 300 Area of the Hanford Site, Richland, Washington. The proposed action would consist of two types of activities: loading and transportation. The loading activities would include placing the billets into the appropriate containers for transportation. The transportation activities would include the tasks required to transport the containers 215 miles (344 km) via highway to the Port of Seattle, Washington, and transfer the containers aboard an ocean cargo vessel for transportation to the United Kingdom. The Department of Energy would only be responsible for conducting the loading activities. The United Kingdom would be responsible for conducting the transportation activities in compliance with all applicable United States and international transportation laws. The tasks associated with the proposed action activities have been performed before and are well defined in terms of requirements and consequences. A risk assessment and a nuclear safety evaluation were performed to address safety issues associated with the proposed action. The risk assessment determined the exposure risk from normal operation and from the maximum credible accident that involves a truck or ship collision followed by a fire that engulfs all the billets in the shipment and the release of the radiological contents of the shipment to the environment. The criticality assessment determined the nuclear safety limits for handling, transporting and storing the shipment under incident-free and accident transport conditions

  12. Development of an administrative record system and information repository system to support environmental cleanup at the Hanford Site in Richland, Washington

    International Nuclear Information System (INIS)

    Sprouse, B.S.

    1991-09-01

    The purpose of this paper is to describe the development of an administrative record (AR) file system for the Hanford Site in Richland, Washington. This paper will focus on the background of the AR system and its implementation at the Hanford Site; the types of documents to be included in an AR file; the management system used to develop and implement the AR system; the unique characteristics of the AR system and the role of the information repositories. The objective of this session is to present the methodology used in developing an AR and information repository system so that common hurdles from various sites can be addressed and resolved similarly. Therefore unnecessary effort does not have to be put forth to resolve the same issues over and over again. The concepts described can be applied to all federal facility sites with a minimum amount of modification and revision. 9 refs

  13. Accident investigation board report on the May 14, 1997, chemical explosion at the Plutonium Reclamation Facility, Hanford Site,Richland, Washington - summary report

    International Nuclear Information System (INIS)

    Gerton, R.E.

    1997-01-01

    This report is a summary of the Accident Investigation Board Report on the May 14, 1997, Chemical Explosion at the Plutonium Reclamation Facility, Hanford Site, Richland, Washington (DOE/RL-97-59). The referenced report provides a greater level of detail and includes a complete discussion of the facts identified, analysis of those facts, conclusions derived from the analysis, identification of the accident's causal factors, and recommendations that should be addressed through follow-up action by the U.S. Department of Energy and its contractors. This companion document provides a concise summary of that report, with emphasis on management issues. Evaluation of emergency and occupational health response to, and radiological and chemical releases from, this accident was not within the scope of this investigation, but is the subject of a separate investigation and report (see DOE/RL-97-62)

  14. Water Monitoring Report for the 200 W Area Tree Windbreak, Hanford Site Richland, Washington

    International Nuclear Information System (INIS)

    Gee, Glendon W.; Carr, Jennifer S.; Goreham, John O.; Strickland, Christopher E.

    2002-01-01

    Water inputs to the vadose zone from irrigation of a tree windbreak in the 200 W Area of the Hanford Site were monitored during the summer of 2002. Water flux and soil-water contents were measured within the windbreak and at two locations just east of the windbreak to assess the impact of the irrigation on the vadose zone and to assist in optimizing the irrigation applications. In May 2002, instrumentation was placed in auger holes and backfilled with local soil. Sensors were connected to a data acquisition system (DAS), and the data were telemetered to the laboratory via digital modem in late June 2002. Data files and graphics were made web accessible for instantaneous retrieval. Precipitation, drip irrigation, deep-water flux, soil-water content, and soil-water pressures have been monitored on a nearly continuous basis from the tree-line site since June 26, 2002.

  15. 300 Area Process Trenches Closure Plan

    International Nuclear Information System (INIS)

    Luke, S.N.

    1994-01-01

    Since 1987, Westinghouse Hanford Company has been a major contractor to the US Department of Energy, Richland Operations Office and has served as co-operator of the 300 Area Process Trenches, the waste management unit addressed in this closure plan. For the purposes of the Resource Conservation and Recovery Act, Westinghouse Hanford Company is identified as ''co-operator.'' The 300 Area Process Trenches Closure Plan (Revision 0) consists of a Resource Conservation and Recovery Act Part A Dangerous Waste Permit Application, Form 3 and a Resource Conservation and Recovery Act Closure Plan. An explanation of the Part A Permit Application, Form 3 submitted with this document is provided at the beginning of the Part A Section. The closure plan consists of nine chapters and six appendices. The 300 Area Process Trenches received dangerous waste discharges from research and development laboratories in the 300 Area and from fuels fabrication processes. This waste consisted of state-only toxic (WT02), corrosive (D002), chromium (D007), spent halogenated solvents (F001, F002, and F003), and spent nonhalogented solvent (F005). Accurate records are unavailable concerning the amount of dangerous waste discharged to the trenches. The estimated annual quantity of waste (item IV.B) reflects the total quantity of both regulated and nonregulated waste water that was discharged to the unit

  16. Hanford 1999 Tier 2 Emergency and Hazardous Chemical Inventory Emergency Planning and Community Right-to-Know Act Section 312

    International Nuclear Information System (INIS)

    ZALOUDEK, D.E.

    2000-01-01

    The Hanford Site covers approximately 1,450 square kilometers (560 square miles) of land that is owned by the U.S. Government and managed by the U.S. Department of Energy, Richland Operations Office (DOE-RL). The Hanford Site is located northwest of the city of Richland, Washington. The city of Richland adjoins the southeastern portion of the Hanford Site boundary and is the nearest population center. Activities on the Hanford Site are centralized in numerically designated areas. The 100 Areas, located along the Columbia River, contain deactivated reactors. The processing units are in the 200 Areas, which are on a plateau approximately 11 kilometers (7 miles) from the Columbia River. The 300 Area, located adjacent to and north of Richland, contains research and development laboratories. The 400 Area, 8 kilometers (5 miles) northwest of the 300 Area, contains the Fast Flux Test Facility previously used for testing liquid metal reactor systems. Adjacent to the north of Richland, the 1100 Area contains offices associated with administration, maintenance, transportation, and materials procurement and distribution. The 600 Area covers all locations not specifically given an area designation. This Tier Two Emergency and Hazardous Chemical Inventory report contains information pertaining to hazardous chemicals managed by DOE-RL and its contractors on the Hanford Site. It does not include chemicals maintained in support of activities conducted by others on lands covered by leases, use permits, easements, and other agreements whereby land is used by parties other than DOE-RL. For example, this report does not include chemicals stored on state owned or leased lands (including the burial ground operated by US Ecology, Inc.), lands owned or used by the Bonneville Power Administration (including the Midway Substation and the Ashe Substation), lands used by the National Science Foundation (the Laser Interferometer Gravitational-Wave Observatory), lands leased to the Washington

  17. 1998 Tier two emergency and hazardous chemical inventory - emergency planning and community right-to-know act section 312

    International Nuclear Information System (INIS)

    ZALOUDEK, D.E.

    1999-01-01

    The Hanford Site covers approximately 1,450 square kilometers (560 square miles) of land that is owned by the U.S, Government and managed by the U.S. Department of Energy, Richland Operations Office (DOE-RL). The Hanford Site is located northwest of the city of Richland, Washington. The city of Richland adjoins the southeastern portion of the Hanford Site boundary and is the nearest population center. Activities on the Hanford Site are centralized in numerically designated areas. The 100 Areas, located along the Columbia River, contain deactivated reactors. The processing units are in the 200 Areas, which are on a plateau approximately 11 kilometers (7 miles) from the Columbia River. The 300 Area, located adjacent to and north of Richland, contains research and development laboratories. The 400 Area, 8 kilometers (5 miles) northwest of the 300 Area, contains the Fast Flux Test Facility previously used for testing liquid metal reactor systems. Adjacent to the north of Richland, the 1100 Area contains offices associated with administration, maintenance, transportation, and materials procurement and distribution. The 600 Area covers all locations not specifically given an area designation. This Tier Two Emergency and Hazardous Chemical Inventory report contains information pertaining to hazardous chemicals managed by DOE-RL and its contractors on the Hanford Site. It does not include chemicals maintained in support of activities conducted by others on lands covered by leases, use permits, easements, and other agreements whereby land is used by parties other than DOE-RL. For example, this report does not include chemicals stored on state owned or leased lands (including the burial ground operated by US Ecology, Inc.), lands owned or used by the Bonneville Power Administration (including the Midway Substation and the Ashe Substation), lands used by the National Science Foundation (the Laser Interferometer Gravitational-Wave Observatory), lands leased to the Washington

  18. Supplemental information for a notice of construction for the Fueled Clad Fabrication System, the Radioisotope Power Systems Facility, and the Fuel Assembly Area

    Energy Technology Data Exchange (ETDEWEB)

    1989-08-01

    This ''Notice of Construction'' has been submitted by the US Department of Energy-Richland Operations Office (P.O. Box 550, Richland, Washington 99352), pursuant to WAC 402-80-070, for three new sources of radionuclide emissions at the Hanford Site in Washington State (Figure 1). The three new sources, the Fueled Clad Fabrication System (FCFS) the Radioisotope Power Systems Facility (RPSF) and the Fuel Assembly Area (FAA) will be located in one facility, the Fuels and materials Examination Facility (FMEF) of the 400 Area. The FMEF was originally designed to provide for post- irradiation examination and fabrication of breeder reactor fuels. These FMEF missions were cancelled before the introduction of any fuel materials or any irradiated material. The current plans are to use the facility to fabricate power supplies to be used in space applications and to produce Fast Flux Test Facility (FFTF) fuel and target assemblies. The FCFS and the RPSF will produce materials and assemblies for application in space. The FAA project will produce FFTF fuel and target assemblies. The FCFS and the RPSF will share the same building, stack, and, in certain cases, the same floor space. Given this relationship, to the extent possible, these systems will be dealt with separately. The FAA is a comparatively independent operation though it will share the FMEF complex.

  19. 300 area solvent evaporator interim status closure plan: Revision 2

    International Nuclear Information System (INIS)

    1989-02-01

    This document describes activities for the closure of a hazardous waste tank treatment facility operated by the US Department of Energy-Richland Operations Office (DOE-RL) and co-operated by the Westinghouse Hanford Company (WHC). This treatment facility was a solvent evaporator located in the 300 Area of the Hanford Site, from 1975 to 1985 on behalf of DOE-RL. The 300 Area Solvent Evaporator (300 ASE) was a modified load lugger (dumpster) in which solvent wastes were evaporated. Some of the solvents were radioactively contaminated because they came from a degreaser which processed bare uranium metal billets from the N Reactor Fuel Manufacturing Facility. The waste was composed of perchloroethylene, trichloroethylene, 1,1,1-trichloroethane, ethyl acetate/bromine solution, paint shop solvents and possibly some used oil. Also, small amounts of uranium, copper, zirconium and possibly beryllium were present in the degreaser solvents as particulates. Radioactive and non-radioactive solvents were not segregated in the 300 ASE, and the entire mixture was regarded as mixed waste

  20. Environmental restoration and waste management site-specific plan for Richland Operations Office. [Contains glossary

    Energy Technology Data Exchange (ETDEWEB)

    1991-09-01

    This document was prepared to implement and support the US Department of Energy-Headquarters (DOE-HQ) national plan. The national plan, entitled Environmental Restoration and Waste Management Five-Year Plan (DOE 1990b) (hereinafter referred to as the DOE-HQ Five-Year Plan) is the cornerstone of the US Department of Energy's (DOE) long-term strategy in environmental restoration and waste management. The DOE-HQ Five-Year Plan addresses overall philosophy and environmental and waste-related activities under the responsibilities of the DOE Office of Environmental Restoration and Waste Management. The plan also reaffirms DOE-HQ goals to bring its nuclear sites into environmental compliance in cooperation with its regulators and the public, and to clean up and restore the environment by 2019 (the commitment for the Hanford Site is for one year sooner, or 2018). This document is part of the site-specific plan for the US Department of Energy-Richland Operations Office (DOE-RL). It is the first revision of the original plan, which was dated December 1989 (DOE-RL 1989a). This document is a companion document to the Overview of the Hanford Cleanup Five-Year Plan (DOE-RL 1989d) and The Hanford Site Environmental Restoration and Waste Management Five-Year Plan Activity Data Sheets (DOE-RL 1991). Although there are three documents that make up the complete DOE-RL plan, this detailed information volume was prepared so it could be used as a standalone document. 71 refs., 40 figs., 28 tabs.

  1. Forensic applications of nitrogen and oxygen isotopes in tracing nitrate sources in urban environments

    Science.gov (United States)

    Silva, S.R.; Ging, P.B.; Lee, R.W.; Ebbert, J.C.; Tesoriero, A.J.; Inkpen, E.L.

    2002-01-01

    Ground and surface waters in urban areas are susceptible to nitrate contamination from septic systems, leaking sewer lines, and fertilizer applications. Source identification is a primary step toward a successful remediation plan in affected areas. In this respect, nitrogen and oxygen isotope ratios of nitrate, in conjunction with hydrologic data and water chemistry, have proven valuable in urban studies from Austin, Texas, and Tacoma, Washington. In Austin, stream water was sampled during stremflow and baseflow conditions to assess surface and subsurface sources of nitrate, respectively. In Tacoma, well waters were sampled in adjacent sewered and un-sewered areas to determine if locally high nitrate concentrations were caused by septic systems in the un-sewered areas. In both studies, sewage was identified as a nitrate source and mixing between sewage and other sources of nitrate was apparent. In addition to source identification, combined nitrogen and oxygen isotopes were important in determining the significance of denitrification, which can complicate source assessment by reducing nitrate concentrations and increasing ??15N values. The two studies illustrate the value of nitrogen and oxygen isotopes of nitrate for forensic applications in urban areas. ?? Published by Elsevier Science Ltd. on behalf of AEHS.

  2. Prevention of significant deterioration permit application for the Fueled Clad Fabrication System, the Radioisotope Power Systems Facility, and the Fuel Assembly Area

    Energy Technology Data Exchange (ETDEWEB)

    1989-08-01

    This New Source Review'' has been submitted by the US Department of Energy-Richland Operations Office (PO Box 550, Richland, Washington 99352), pursuant to WAC 173-403-050 and in compliance with the Department of Ecology Guide to Processing A Prevention Of Significant Deterioration (PSD) Permit'' for three new sources of radionuclide emissions at the Hanford Site in Washington State. The three new sources, the Fueled Clad Fabrication System (FCFS), the Radioisotope Power Systems Facility (RPSF), and the Fuel Assembly Area (FAA), will be located in one facility, the Fuels and Materials Examination Facility (FMEF) of the 400 Area. The FMEF was originally designed to provide for post-irradiation examination and fabrication of breeder reactor fuels. These FMEF missions were cancelled before the introduction of any fuel materials or any irradiated material. The current plans are to use the facility to fabricate power supplies for use in space applications and to produce Fast Flux Test Facility (FFTF) fuel and target assemblies. The FCFS and the RPSF will produce materials and assemblies for application in space. The FAA project will produce FFTF fuel and target assemblies. The FCFS and the RPSF will share the same building, stack, and, in certain cases, the same floor space. Given this relationship, these systems will be dealt with separately to the extent possible. The FAA is a comparatively independent operation though it will share the FMEF complex.

  3. Conversion and correction factors for historical measurements of iodine-131 in Hanford-area vegetation, 1945--1947

    International Nuclear Information System (INIS)

    Mart, E.I.; Denham, D.H.; Thiede, M.E.

    1993-12-01

    This report is a result of the Hanford Environmental Dose Reconstruction (HEDR) Project whose goal is to estimate the radiation dose that individuals could have received from emissions since 1944 at the U.S. Department of Energy's (DOE) Hanford Site near Richland, Washington. The HEDR Project is conducted by Battelle, Pacific Northwest Laboratories (BNW). One of the radionuclides emitted that would affect the radiation dose was iodine-131. This report describes in detail the reconstructed conversion and correction factors for historical measurements of iodine-131 in Hanford-area vegetation which was collected from the beginning of October 1945 through the end of December 1947

  4. 324 Building radiochemical engineering cells, high-level vault, low-level vault, and associated areas closure plan

    International Nuclear Information System (INIS)

    Barnett, J.M.

    1998-01-01

    The Hanford Site, located adjacent to and north of Richland, Washington, is operated by the US Department of Energy, Richland Operations Office (RL). The 324 Building is located in the 300 Area of the Hanford Site. The 324 Building was constructed in the 1960s to support materials and chemical process research and development activities ranging from laboratory/bench-scale studies to full engineering-scale pilot plant demonstrations. In the mid-1990s, it was determined that dangerous waste and waste residues were being stored for greater than 90 days in the 324 Building Radiochemical Engineering Cells (REC) and in the High-Level Vault/Low-Level Vault (HLV/LLV) tanks. [These areas are not Resource Conservation and Recovery Act of 1976 (RCRA) permitted portions of the 324 Building.] Through the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) Milestone M-89, agreement was reached to close the nonpermitted RCRA unit in the 324 Building. This closure plan, managed under TPA Milestone M-20-55, addresses the identified building areas targeted by the Tri-Party Agreement and provides commitments to achieve the highest degree of compliance practicable, given the special technical difficulties of managing mixed waste that contains high-activity radioactive materials, and the physical limitations of working remotely in the areas within the subject closure unit. This closure plan is divided into nine chapters. Chapter 1.0 provides the introduction, historical perspective, 324 Building history and current mission, and the regulatory basis and strategy for managing the closure unit. Chapters 2.0, 3.0, 4.0, and 5.0 discuss the detailed facility description, process information, waste characteristics, and groundwater monitoring respectively. Chapter 6.0 deals with the closure strategy and performance standard, including the closure activities for the B-Cell, D-Cell, HLV, LLV; piping and miscellaneous associated building areas. Chapter 7.0 addresses the

  5. 200 Area Effluent Treatment Facility: Delisting petition

    International Nuclear Information System (INIS)

    1993-08-01

    Waste water has been generated for over 40 years as a result of operations conducted on the Hanford Site. This waste water previously was discharged to cribs, ponds, or ditches. An example of such waste water includes process condensate that might have been in contact with dangerous waste or mixed waste (containing both radioactive and dangerous components). This petition presents the treatment technologies that are designed into the 200 Area Effluent Treatment Facility to eliminate the dangerous characteristics of the waste and to delist the effluent in accordance with the requirements found in 40 Code of Federal Regulations 260.20 and 260.22. The purpose of this petition is to demonstrate that the 242-A Evaporator process condensate will be treated adequately so that the effluent from the 200 Area Effluent Treatment Facility will no longer require management as a regulated dangerous waste. This demonstration was performed by use of a surrogate (synthetic) waste, designed by the US Department of Energy, Richland Operations Office to include species that represent all organic and inorganic constituents (but not radionuclide species) expected to be found on the Hanford Site. Thus, the surrogate will encompass not only the expected 242-A Evaporator process condensate characteristics, but those of other potential 200 Area Effluent Treatment Facility waste streams and additional 40 CFR Appendix VIII constituents

  6. Puget Sound area electric reliability plan. Draft environmental impact statement

    Energy Technology Data Exchange (ETDEWEB)

    1991-09-01

    The Puget Sound Area Electric Reliability Plan Draft Environmental Impact Statement (DEIS) identifies the alternatives for solving a power system problem in the Puget Sound area. This Plan is undertaken by Bonneville Power Administration (BPA), Puget Sound Power & Light, Seattle City Light, Snohomish Public Utility District No. 1 (PUD), and Tacoma Public Utilities. The Plan consists of potential actions in Puget Sound and other areas in the State of Washington. A specific need exists in the Puget Sound area for balance between east-west transmission capacity and the increasing demand to import power generated east of the Cascades. At certain times of the year, there is more demand for power than the electric system can supply in the Puget Sound area. This high demand, called peak demand, occurs during the winter months when unusually cold weather increases electricity use for heating. The existing power system can supply enough power if no emergencies occur. However, during emergencies, the system will not operate properly. As demand grows, the system becomes more strained. To meet demand, the rate of growth of demand must be reduced or the ability to serve the demand must be increased, or both. The plan to balance Puget Sound`s power demand and supply has these purposes: The plan should define a set of actions that would accommodate ten years of load growth (1994--2003). Federal and State environmental quality requirements should be met. The plan should be consistent with the plans of the Northwest Power Planning Council. The plan should serve as a consensus guideline for coordinated utility action. The plan should be flexible to accommodate uncertainties and differing utility needs. The plan should balance environmental impacts and economic costs. The plan should provide electric system reliability consistent with customer expectations. 29 figs., 24 tabs.

  7. Puget Sound Area Electric Reliability Plan : Draft Environmental Impact State.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1991-09-01

    The Puget Sound Area Electric Reliability Plan Draft Environmental Impact Statement (DEIS) identifies the alternatives for solving a power system problem in the Puget Sound area. This Plan is undertaken by Bonneville Power Administration (BPA), Puget Sound Power Light, Seattle City Light, Snohomish Public Utility District No. 1 (PUD), and Tacoma Public Utilities. The Plan consists of potential actions in Puget Sound and other areas in the State of Washington. A specific need exists in the Puget Sound area for balance between east-west transmission capacity and the increasing demand to import power generated east of the Cascades. At certain times of the year, there is more demand for power than the electric system can supply in the Puget Sound area. This high demand, called peak demand, occurs during the winter months when unusually cold weather increases electricity use for heating. The existing power system can supply enough power if no emergencies occur. However, during emergencies, the system will not operate properly. As demand grows, the system becomes more strained. To meet demand, the rate of growth of demand must be reduced or the ability to serve the demand must be increased, or both. The plan to balance Puget Sound's power demand and supply has these purposes: The plan should define a set of actions that would accommodate ten years of load growth (1994--2003). Federal and State environmental quality requirements should be met. The plan should be consistent with the plans of the Northwest Power Planning Council. The plan should serve as a consensus guideline for coordinated utility action. The plan should be flexible to accommodate uncertainties and differing utility needs. The plan should balance environmental impacts and economic costs. The plan should provide electric system reliability consistent with customer expectations. 29 figs., 24 tabs.

  8. Calculation of particulate dispersion in a design-basis tornadic storm from the Exxon Nuclear Company, Richland, Washington

    Energy Technology Data Exchange (ETDEWEB)

    Pepper, D.W.

    1978-07-01

    A three-dimensional numerical model is used to calculate ground-level air concentration and deposition (due to precipitation scavenging) after a hypothetical tornado strike at the Exxon Nuclear Company at Richland, Washington. Plutonium particles less than 20 ..mu..m in diameter are assumed to be lifted into the tornadic storm cell by the vortex. The rotational characteristics of the tornadic storm are embedded within the larger mesoscale flow of the storm system. The design-basis translational wind values are based on probabilities associated with existing records of tornado strikes in the vicinity of the plant site. Turbulence exchange coefficients are based on empirical values deduced from experimental data in severe storms and from theoretical assumptions obtained from the literature. The method of moments is used to incorporate subgrid-scale resolution of the concentration within a grid cell volume. This method is a quasi-Lagrangian scheme which minimizes numerical error associated with advection. In all case studies, the effects of updrafts and downdrafts, coupled with scavenging of the particulates by precipitation, account for most of the material being deposited within 20 to 45 km downwind of the plant site. Ground-level isopleths in the x-y plane show that most of the material is deposited behind and slightly to the left of the centerline trajectory of the storm. Approximately 5% of the material is dispersed into the stratosphere and anvil section of the storm.

  9. Calculation of particulate dispersion in a design-basis tornadic storm from the Exxon Nuclear Company, Richland, Washington

    International Nuclear Information System (INIS)

    Pepper, D.W.

    1978-07-01

    A three-dimensional numerical model is used to calculate ground-level air concentration and deposition (due to precipitation scavenging) after a hypothetical tornado strike at the Exxon Nuclear Company at Richland, Washington. Plutonium particles less than 20 μm in diameter are assumed to be lifted into the tornadic storm cell by the vortex. The rotational characteristics of the tornadic storm are embedded within the larger mesoscale flow of the storm system. The design-basis translational wind values are based on probabilities associated with existing records of tornado strikes in the vicinity of the plant site. Turbulence exchange coefficients are based on empirical values deduced from experimental data in severe storms and from theoretical assumptions obtained from the literature. The method of moments is used to incorporate subgrid-scale resolution of the concentration within a grid cell volume. This method is a quasi-Lagrangian scheme which minimizes numerical error associated with advection. In all case studies, the effects of updrafts and downdrafts, coupled with scavenging of the particulates by precipitation, account for most of the material being deposited within 20 to 45 km downwind of the plant site. Ground-level isopleths in the x-y plane show that most of the material is deposited behind and slightly to the left of the centerline trajectory of the storm. Approximately 5% of the material is dispersed into the stratosphere and anvil section of the storm

  10. 78 FR 55731 - Notice of Service Delivery Area Designation for the Wilton Rancheria

    Science.gov (United States)

    2013-09-11

    ... medical priority, and the actual availability and accessibility of alternate resources in accordance with... Springs, WY, Fremont, WY, Reservation, Wyoming. Sublette, WY. Aroostook Band of Micmac Indians of... Reservation, Montana. Richland, MT, Roosevelt, MT, Sheridan, MT, Valley, MT. Bad River Band of the Lake...

  11. Performance assessment for the disposal of low-level waste in the 200 West Area Burial Grounds

    Energy Technology Data Exchange (ETDEWEB)

    Wood, M.I.; Khaleel, R.; Rittmann, P.D.; Lu, A.H.; Finfrock, S.H.; DeLorenzo, T.H. [Westinghouse Hanford Co., Richland, WA (United States); Serne, R.J.; Cantrell, K.J. [Pacific Northwest Lab., Richland, WA (United States)

    1995-06-01

    This document reports the findings of a performance assessment (PA) analysis for the disposal of solid low-level radioactive waste (LLW) in the 200 West Area Low-Level Waste Burial Grounds (LLBG) in the northwest corner of the 200 West Area of the Hanford Site. This PA analysis is required by US Department of Energy (DOE) Order 5820.2A (DOE 1988a) to demonstrate that a given disposal practice is in compliance with a set of performance objectives quantified in the order. These performance objectives are applicable to the disposal of DOE-generated LLW at any DOE-operated site after the finalization of the order in September 1988. At the Hanford Site, DOE, Richland Operations Office (RL) has issued a site-specific supplement to DOE Order 5820.2A, DOE-RL 5820.2A (DOE 1993), which provides additiona I ce objectives that must be satisfied.

  12. Performance assessment for the disposal of low-level waste in the 200 West Area Burial Grounds

    International Nuclear Information System (INIS)

    Wood, M.I.; Khaleel, R.; Rittmann, P.D.; Lu, A.H.; Finfrock, S.H.; DeLorenzo, T.H.; Serne, R.J.; Cantrell, K.J.

    1995-06-01

    This document reports the findings of a performance assessment (PA) analysis for the disposal of solid low-level radioactive waste (LLW) in the 200 West Area Low-Level Waste Burial Grounds (LLBG) in the northwest corner of the 200 West Area of the Hanford Site. This PA analysis is required by US Department of Energy (DOE) Order 5820.2A (DOE 1988a) to demonstrate that a given disposal practice is in compliance with a set of performance objectives quantified in the order. These performance objectives are applicable to the disposal of DOE-generated LLW at any DOE-operated site after the finalization of the order in September 1988. At the Hanford Site, DOE, Richland Operations Office (RL) has issued a site-specific supplement to DOE Order 5820.2A, DOE-RL 5820.2A (DOE 1993), which provides additiona I ce objectives that must be satisfied

  13. Contract W911NF-09-1-0105 (Monterey Institute of International Studies)

    Science.gov (United States)

    2014-04-08

    the International Association for Conflict Management , in Tacoma, Washington, June 30, 2013-July 3, 2013. (This version of the paper was provided to...Extraordinary Measure or Business as Usual?” at the 26th Annual Conference of the International Association for Conflict Management , in Tacoma, Washington

  14. Hanford 100-N Area Tracer Study Final Report

    International Nuclear Information System (INIS)

    Kretzschmar, S.P.; Bedi, G.S.; Martinez, P.; Ervin, K.

    1996-09-01

    This document provides an engineering tracer study final report for the determination of contact time for the disinfection process at Group A Nontransient Noncommunity water treatment plant for the 100- N Water Plant (located on the Hanford Site in Richland, Washington). The purpose of this study is to determine the actual detention time within the plant clearwell, and the disinfection contact time at several clearwell effluent flow rates

  15. Waste Tank Summary Report for Month Ending February 28 2001

    International Nuclear Information System (INIS)

    HANLON, B.M.

    2001-01-01

    This report is the official inventory for radioactive waste stored in underground tanks in the 200 Areas at the Hanford Site. Data that depict the status of stored radioactive waste and tank vessel integrity are contained within the report. This report provides data on each of the existing 177 large underground waste storage tanks and 63 smaller miscellaneous underground storage tanks and special surveillance facilities, and supplemental information regarding tank surveillance anomalies and ongoing investigations. This report is intended to meet the requirement of U.S. Department of Energy-Richland Operations Office Order 435.I (DOE-RL, July 1999, Radioactive Waste Management, U.S. Department of Energy-Richland Operations Office, Richland, Washington) requiring the reporting of waste inventories and space utilization for Hanford Tank Farm tanks

  16. Conversion and correction factors for historical measurements of iodine-131 in Hanford-area vegetation, 1945--1947. Hanford Environmental Dose Reconstruction Project

    Energy Technology Data Exchange (ETDEWEB)

    Mart, E.I.; Denham, D.H.; Thiede, M.E.

    1993-12-01

    This report is a result of the Hanford Environmental Dose Reconstruction (HEDR) Project whose goal is to estimate the radiation dose that individuals could have received from emissions since 1944 at the U.S. Department of Energy`s (DOE) Hanford Site near Richland, Washington. The HEDR Project is conducted by Battelle, Pacific Northwest Laboratories (BNW). One of the radionuclides emitted that would affect the radiation dose was iodine-131. This report describes in detail the reconstructed conversion and correction factors for historical measurements of iodine-131 in Hanford-area vegetation which was collected from the beginning of October 1945 through the end of December 1947.

  17. Conversion and correction factors for historical measurements of iodine-131 in Hanford-area vegetation 1948--1951

    International Nuclear Information System (INIS)

    Denham, D.H.; Mart, E.I.; Thiede, M.E.

    1993-09-01

    This report is a part of the Hanford Environmental Dose Reconstruction (HEDR) Project, whose goal is to estimate the radiation dose that individuals could have received from emissions since 1944 at the US Department of Energy's (DOE) Hanford Site near Richland, Washington. The key radionuclide emitted that would affect the radiation dose was iodine-131 (Napier 1992). Because the early methods of measuring iodine-131 were not comparable to later techniques, conversion and correction factors are needed to convert the historical measurement data into concentration values that would be determined using today's knowledge and technologies. This report describes the conversion and correction factors developed for reconstructing historical measurements of iodine-131 in Hanford-area vegetation, which was collected from 1948 through the end of December 1951

  18. 100-D Area technical baseline report

    International Nuclear Information System (INIS)

    Carpenter, R.W.

    1993-01-01

    This document is prepared in support of the 100 Area Environmental Restoration activity at the US Department of Energy's Hanford Site near Richland, Washington. It provides a technical baseline of waste sites located at the 100-D Area. The report is based on an environmental investigation undertaken by the Westinghouse Hanford Company (WHC) History Office in support of the Environmental Restoration Engineering Function and on review and evaluation of numerous Hanford Site current and historical reports, drawings, and photographs, supplemented by site inspections and employee interviews. No intrusive field investigation or sampling was conducted. All Hanford coordinate locations are approximate locations taken from several different maps and drawings of the 100-D Area. Every effort was made to derive coordinate locations for the center of each facility or waste site, except where noted, using standard measuring devices. Units of measure are shown as they appear in reference documents. The 100-D Area is made up of three operable units: 100-DR-1, 100-DR-2, and 100-DR-3. All three are addressed in this report. These operable units include liquid and solid waste disposal sites in the vicinity of, and related to, the 100-D and 100-DR Reactors. A fourth operable unit, 100-HR-3, is concerned with groundwater and is not addressed here. This report describes waste sites which include cribs, trenches, pits, french drains, retention basins, solid waste burial grounds, septic tanks, and drain fields. Each waste site is described separately and photographs are provided where available. A complete list of photographs can be found in Appendix A. A comprehensive environmental summary is not provided here but may be found in Hanford Site National Environmental Policy Act Characterization (Cushing 1988), which describes the geology and soils, meteorology, hydrology, land use, population, and air quality of the area

  19. Transfer of Plutonium-Uranium Extraction Plant and N Reactor irradiated fuel for storage at the 105-KE and 105-KW fuel storage basins, Hanford Site, Richland Washington

    International Nuclear Information System (INIS)

    1995-07-01

    The U.S. Department of Energy (DOE) needs to remove irradiated fuel from the Plutonium-Uranium Extraction (PUREX) Plant and N Reactor at the Hanford Site, Richland, Washington, to stabilize the facilities in preparation for decontamination and decommissioning (D ampersand D) and to reduce the cost of maintaining the facilities prior to D ampersand D. DOE is proposing to transfer approximately 3.9 metric tons (4.3 short tons) of unprocessed irradiated fuel, by rail, from the PUREX Plant in the 200 East Area and the 105 N Reactor (N Reactor) fuel storage basin in the 100 N Area, to the 105-KE and 105-KW fuel storage basins (K Basins) in the 100 K Area. The fuel would be placed in storage at the K Basins, along with fuel presently stored, and would be dispositioned in the same manner as the other existing irradiated fuel inventory stored in the K Basins. The fuel transfer to the K Basins would consolidate storage of fuels irradiated at N Reactor and the Single Pass Reactors. Approximately 2.9 metric tons (3.2 short tons) of single-pass production reactor, aluminum clad (AC) irradiated fuel in four fuel baskets have been placed into four overpack buckets and stored in the PUREX Plant canyon storage basin to await shipment. In addition, about 0.5 metric tons (0.6 short tons) of zircaloy clad (ZC) and a few AC irradiated fuel elements have been recovered from the PUREX dissolver cell floors, placed in wet fuel canisters, and stored on the canyon deck. A small quantity of ZC fuel, in the form of fuel fragments and chips, is suspected to be in the sludge at the bottom of N Reactor's fuel storage basin. As part of the required stabilization activities at N Reactor, this sludge would be removed from the basin and any identifiable pieces of fuel elements would be recovered, placed in open canisters, and stored in lead lined casks in the storage basin to await shipment. A maximum of 0.5 metric tons (0.6 short tons) of fuel pieces is expected to be recovered

  20. Radioactive Tank Waste Remediation Focus Area. Technology summary

    International Nuclear Information System (INIS)

    1995-06-01

    In February 1991, DOE's Office of Technology Development created the Underground Storage Tank Integrated Demonstration (UST-ID), to develop technologies for tank remediation. Tank remediation across the DOE Complex has been driven by Federal Facility Compliance Agreements with individual sites. In 1994, the DOE Office of Environmental Management created the High Level Waste Tank Remediation Focus Area (TFA; of which UST-ID is now a part) to better integrate and coordinate tank waste remediation technology development efforts. The mission of both organizations is the same: to focus the development, testing, and evaluation of remediation technologies within a system architecture to characterize, retrieve, treat, concentrate, and dispose of radioactive waste stored in USTs at DOE facilities. The ultimate goal is to provide safe and cost-effective solutions that are acceptable to both the public and regulators. The TFA has focused on four DOE locations: the Hanford Site in Richland, Washington, the Idaho National Engineering Laboratory (INEL) near Idaho Falls, Idaho, the Oak Ridge Reservation in Oak Ridge, Tennessee, and the Savannah River Site (SRS) in Aiken, South Carolina

  1. Tank farm surveillance and waste status summary report for October 1992

    International Nuclear Information System (INIS)

    Hanlon, B.M.

    1993-01-01

    This report is the official inventory for radioactive waste stored in underground tanks in the 200 Areas at the Hanford Site. Data that depict the status of stored radioactive waste and tank vessel integrity are contained within the report. This report provides data on each of the existing 177 large underground waste storage tanks and 49 smaller catch tanks and special surveillance facilities, and supplemental information regarding tank surveillance anomalies and ongoing investigations. This report is intended to meet the requirement of US Department of Energy-Richland Operations Office Order 5820.2A, Chapter 1, Section 3.e. (3) (DOE-RL, 1990, Radioactive Waste Management, US Department of Energy-Richland Operation Office, Richland, Washington) requiring the reporting of waste inventories and space utilization for Hanford Tank Farm Tanks

  2. Tank farm surveillance and waste status summary report for January 1993

    International Nuclear Information System (INIS)

    Hanlon, B.M.

    1993-03-01

    This report is the official inventory for radioactive waste stored in underground tanks in the 200 Areas at the Hanford Site. Data that depict the status of stored radioactive waste and tank vessel integrity are contained within the report. This report provides data on each of the existing 177 large underground waste storage tanks and 49 smaller catch tanks and special surveillance facilities, and supplemental information regarding tank surveillance anomalies and ongoing investigations. This report is intended to meet the requirement of US Department of Energy-Richland Operations Office Order 5820.2A, Chapter I, Section 3.e. (3) (DOE-RL, 1990, Radioactive Waste Management, US Department of Energy-Richland Operation Office, Richland, Washington) requiring the reporting of waste inventories and space utilization for Hanford Tank Farm Tanks

  3. Tank farm surveillance and waste status summary report for November 1992

    International Nuclear Information System (INIS)

    Hanlon, B.M.

    1993-02-01

    This report is the official inventory for radioactive waste stored in underground tanks in the 200 Areas at the Hanford Site. Data that depict the status of stored radioactive waste and tank vessel integrity are contained within the report. This report provides data on each of the existing 177 large underground waste storage tanks and 49 smaller catch tanks and special surveillance facilities, and supplemental information regarding tank surveillance anomalies and ongoing investigations. This report is intended to meet the requirement of US Department of Energy-Richland Operations Office Order 5820.2A, Chapter 1, Section 3.e. (3) (DOE-RL, 1990, Radioactive Waste Management, US Department of Energy-Richland Operation Office, Richland, Washington) requiring the reporting of waste inventories and space utilization for Hanford Tank Farm Tanks

  4. Tank Farm surveillance and waste status summary report for September 1993

    International Nuclear Information System (INIS)

    Hanlon, B.M.

    1994-01-01

    This report is the official inventory for radioactive waste stored in underground tanks in the 200 Areas at the Hanford Site. Data that depict the status of stored radioactive waste and tank vessel integrity are contained within the report. This report provides data on each of the existing 177 large underground waste storage tanks and 49 smaller catch tanks and special surveillance facilities, and supplemental information regarding tank surveillance anomalies and ongoing investigations. This report is intended to meet the requirement of US Department of Energy-Richland Operations Office Order 5820.2A, Chapter 1, Section 3.e. (3) (DOE-RL, 1990, Radioactive Waste Management, US Department of Energy-Richland Operation Office, Richland, Washington) requiring the reporting of waste inventories and space utilization for Hanford Tank Farm Tanks

  5. Tank farm surveillance and waste status summary report for October 1992

    Energy Technology Data Exchange (ETDEWEB)

    Hanlon, B.M.

    1993-01-01

    This report is the official inventory for radioactive waste stored in underground tanks in the 200 Areas at the Hanford Site. Data that depict the status of stored radioactive waste and tank vessel integrity are contained within the report. This report provides data on each of the existing 177 large underground waste storage tanks and 49 smaller catch tanks and special surveillance facilities, and supplemental information regarding tank surveillance anomalies and ongoing investigations. This report is intended to meet the requirement of US Department of Energy-Richland Operations Office Order 5820.2A, Chapter 1, Section 3.e. (3) (DOE-RL, 1990, Radioactive Waste Management, US Department of Energy-Richland Operation Office, Richland, Washington) requiring the reporting of waste inventories and space utilization for Hanford Tank Farm Tanks.

  6. Tank farm surveillance and waste status summary report for May 1994

    Energy Technology Data Exchange (ETDEWEB)

    Hanlon, B.M.

    1994-08-01

    This report is the official inventory for radioactive waste stored in underground tanks in the 200 Areas at the Hanford Site. Data that depict the status of stored radioactive waste and tank vessel integrity are contained within the report. This report provides data on each of the existing 177 large underground waste storage tanks and 49 smaller catch tanks and special surveillance facilities, and supplemental information regarding tank surveillance anomalies and ongoing investigations. This report is intended to meet the requirement of US Department of Energy-Richland Operations Office Order 5820.2A, Chapter 1, Section 3.e. (3) (DOE-RL, 1990, Radioactive Waste Management, US Department of Energy-Richland Operation Office, Richland, Washington) requiring the reporting of waste inventories and space utilization for Hanford Tank Farm Tanks.

  7. Tank farm surveillance and waste status summary report for June 1993

    International Nuclear Information System (INIS)

    Hanlon, B.M.

    1993-10-01

    This report is the official inventory for radioactive waste stored in underground tanks in the 200 Areas at the Hanford Site. Data that depict the status of stored radioactive waste and tank vessel integrity are contained within the report. This report provides data on each of the existing 177 large underground waste storage tanks and 49 smaller catch tanks and special surveillance facilities, and supplemental information regarding tank surveillance anomalies and ongoing investigations. This report is intended to meet the requirement of US Department of Energy-Richland Operations Office Order 5820.2A, Chapter I, Section 3.e. (3) (DOE-RL, 1990, Radioactive Waste Management, US Department of Energy-Richland Operation Office, Richland, Washington) requiring the reporting of waste inventories and space utilization for Hanford Tank Farm Tanks

  8. Tank farm surveillance and waste status summary report for May 1994

    International Nuclear Information System (INIS)

    Hanlon, B.M.

    1994-08-01

    This report is the official inventory for radioactive waste stored in underground tanks in the 200 Areas at the Hanford Site. Data that depict the status of stored radioactive waste and tank vessel integrity are contained within the report. This report provides data on each of the existing 177 large underground waste storage tanks and 49 smaller catch tanks and special surveillance facilities, and supplemental information regarding tank surveillance anomalies and ongoing investigations. This report is intended to meet the requirement of US Department of Energy-Richland Operations Office Order 5820.2A, Chapter 1, Section 3.e. (3) (DOE-RL, 1990, Radioactive Waste Management, US Department of Energy-Richland Operation Office, Richland, Washington) requiring the reporting of waste inventories and space utilization for Hanford Tank Farm Tanks

  9. Tank farm surveillance and waste status summary report for December 1992

    International Nuclear Information System (INIS)

    Hanlon, B.M.

    1993-02-01

    This report is the official inventory for radioactive waste stored in underground tanks in the 200 Areas at the Hanford Site. Data that depict the status of stored radioactive waste and tank vessel integrity are contained within the report. This report provides data on each of the existing 177 large underground waste storage tanks and 49 smaller catch tanks and special surveillance facilities, and supplemental information regarding tank surveillance anomalies and ongoing investigations. This report is intended to meet the requirement of US Department of Energy-Richland Operations Office Order 5820.2A, Chapter I, Section 3.e. (3) (DOE-RL, 1990, Radioactive Waste Management, US Department of Energy-Richland Operation Office, Richland, Washington) requiring the reporting of waste inventories and space utilization for Hanford Tank Farm Tanks

  10. Tank Farm surveillance and waste status summary report for March 1993

    International Nuclear Information System (INIS)

    Hanlon, B.M.

    1993-05-01

    This report is the official inventory for radioactive waste stored in underground tanks in the 200 Areas at the Hanford Site. Data that depict the status of stored radioactive waste and tank vessel integrity are Contained within the report. This report provides data on each of the existing 177 large underground waste storage tanks and 49 smaller catch tanks and special surveillance facilities, and supplemental information regarding flank surveillance anomalies and ongoing investigations. This report is intended to meet the requirement of US Department of Energy-Richland Operations Office order 5820.2A, Chapter I, Section 3.e. (3) (DOE-RL, 1990, Radioactive Waste Management, US Department of Energy-Richland Operation Office, Richland, Washington) requiring the reporting of waste inventories and space utilization for Hanford Tank Farm Tanks

  11. Tank farm surveillance and waste status summary report for December 1993

    Energy Technology Data Exchange (ETDEWEB)

    Hanlon, B.M.

    1994-05-01

    This report is the official inventory for radioactive waste stored in underground tanks in the 200 Areas at the Hanford Site. Data that depict the status of stored radioactive waste and tank vessel integrity are contained within the report. This report provides data on each of the existing 177 large underground waste storage tanks and 49 smaller catch tanks and special 9 surveillance facilities, and supplemental information regarding tank surveillance anomalies and ongoing investigations. This report is intended to meet the requirement of U.S. Department of Energy-Richland Operations Office Order 5820.2A, Chapter I, Section 3.e. (3) (DOE-RL, 1990, Radioactive Waste Management, U.S. Department of Energy-Richland Operation Office, Richland, Washington) requiring the reporting of waste inventories and space utilization for Hanford Tank Farm Tanks.

  12. Tank farm surveillance and waste status summary report for December 1992

    Energy Technology Data Exchange (ETDEWEB)

    Hanlon, B.M.

    1993-02-01

    This report is the official inventory for radioactive waste stored in underground tanks in the 200 Areas at the Hanford Site. Data that depict the status of stored radioactive waste and tank vessel integrity are contained within the report. This report provides data on each of the existing 177 large underground waste storage tanks and 49 smaller catch tanks and special surveillance facilities, and supplemental information regarding tank surveillance anomalies and ongoing investigations. This report is intended to meet the requirement of US Department of Energy-Richland Operations Office Order 5820.2A, Chapter I, Section 3.e. (3) (DOE-RL, 1990, Radioactive Waste Management, US Department of Energy-Richland Operation Office, Richland, Washington) requiring the reporting of waste inventories and space utilization for Hanford Tank Farm Tanks.

  13. Salient Feature Identification and Analysis using Kernel-Based Classification Techniques for Synthetic Aperture Radar Automatic Target Recognition

    Science.gov (United States)

    2014-03-27

    22 2.2 Traditional backprojection image of Nissan Maxima . . . . . . . . . . . . . . . 23 2.3 SPLIT image output for Nissan Maxima...Toyota Tacoma . . . . . . . . . . . . . . . . . . . . . 27 2.6 SPLIT canonical shape histogram for Nissan Maxima . . . . . . . . . . . . . . 28 2.7 SPLIT...1999) SUV Nissan Maxima Sedan Mazda MPV SUV Mitsubishi Sedan Nissan Sentra Sedan Toyota Avalon Sedan Toyota Tacoma SUV is developed for distinguishing

  14. Richland Operations (DOE-RL) Environmental Safety Health (ES and H) FY 2000 and FY 2001 Execution Commitment Summary

    Energy Technology Data Exchange (ETDEWEB)

    REEP, I.E.

    2000-12-01

    All sites in the U.S. Department of Energy (DOE) Complex prepare this report annually for the DOE Office of Environment, Safety and Health (EH). The purpose of this report is to provide a summary of the previous and current year's Environment, Safety and Health (ES&H) execution commitments and the Safety and Health (S&H) resources that support these activities. The fiscal year (FY) 2000 and 2001 information and data contained in the Richland Operations Environment, Safefy and Health Fiscal Year 2002 Budget-Risk Management Summary (RL 2000a) were the basis for preparing this report. Fiscal year 2001 activities are based on the President's Amended Congressional Budget Request of $689.6 million for funding Ofice of Environmental Management (EM) $44.0 million for Fast Flux Test Facility standby less $7.0 million in anticipated DOE, Headquarters holdbacks for Office of Nuclear Energy, Science and Technology (NE); and $55.3 million for Safeguards and Security (SAS). Any funding changes as a result of the Congressional appropriation process will be reflected in the Fiscal Year 2003 ES&H Budget-Risk Management Summary to be issued in May 2001. This report provides the end-of-year status of FY 2000 ES&H execution commitments, including actual S&H expenditures, and describes planned FY 2001 ES&H execution commitments and the S&H resources needed to support those activities. This requirement is included in the ES&H guidance contained in the FY 2002 Field Budget Call (DOE 2000).

  15. Revegetation Plan for Areas of the Fitzner-Eberhardt Arid Lands Ecology Reserve Affected by Decommissioning of Buildings and Infrastructure and Debris Clean-up Actions

    Energy Technology Data Exchange (ETDEWEB)

    Downs, Janelle L.; Durham, Robin E.; Larson, Kyle B.

    2011-01-01

    The U.S. Department of Energy (DOE), Richland Operations Office is working to remove a number of facilities on the Fitzner Eberhardt Arid Lands Ecology Reserve (ALE), which is part of the Hanford Reach National Monument. Decommissioning and removal of buildings and debris on ALE will leave bare soils and excavated areas that need to be revegetated to prevent erosion and weed invasion. Four main areas within ALE are affected by these activities (DOE 2009;DOE/EA-1660F): 1) facilities along the ridgeline of Rattlesnake Mountain, 2) the former Nike missile base and ALE HQ laboratory buildings, 3) the aquatic research laboratory at Rattlesnake Springs area, and 4) a number of small sites across ALE where various types of debris remain from previous uses. This revegetation plan addresses the revegetation and restoration of those land areas disturbed by decommissioning and removal of buildings, facilities and associated infrastructure or debris removal. The primary objective of the revegetation efforts on ALE is to establish native vegetation at each of the sites that will enhance and accelerate the recovery of the native plant community that naturally persists at that location. Revegetation is intended to meet the direction specified by the Environmental Assessment (DOE 2009; DOE/EA-1660F) and by Stipulation C.7 of the Memorandum of Agreement (MOA) for the Rattlesnake Mountain Combined Community Communication Facility and InfrastructureCleanup on the Fitzner/Eberhardt Arid Lands Ecology Reserve, Hanford Site, Richland Washington(DOE 2009; Appendix B). Pacific Northwest National Laboratory (PNNL) under contract with CH2M Hill Plateau Remediation Company (CPRC) and in consultation with the tribes and DOE-RL developed a site-specific strategy for each of the revegetation units identified within this document. The strategy and implementation approach for each revegetation unit identifies an appropriate native species mix and outlines the necessary site preparation activities

  16. 75 FR 82274 - Changes in Flood Elevation Determinations

    Science.gov (United States)

    2010-12-30

    ... respective addresses are listed in the table below. FOR FURTHER INFORMATION CONTACT: Luis Rodriguez, Chief..., Currituck, NC 27929. South Carolina: Richland Unincorporated areas May 28, 2010; June The Honorable Paul...

  17. RICHLAND COUNTY APPROXIMATE HYDRAULICS,RICHLAND COUNTY,OH USA

    Data.gov (United States)

    Federal Emergency Management Agency, Department of Homeland Security — Recent developments in digital terrain and geospatial database management technology make it possible to protect this investment for existing and future projects to...

  18. Survey of Revegetated Areas on the Fitzner/Eberhardt Arid Lands Ecology Reserve: Status and Initial Monitoring Results

    Energy Technology Data Exchange (ETDEWEB)

    Downs, Janelle L.; Link, Steven O.; Rozeboom, Latricia L.; Durham, Robin E.; Cruz, Rico O.; Mckee, Sadie A.

    2011-09-01

    During 2010, the U.S. Department of Energy (DOE), Richland Operations Office removed a number of facilities and debris from the Fitzner/Eberhardt Arid Lands Ecology Reserve (ALE), which is part of the Hanford Reach National Monument (HRNM). Revegetation of disturbed sites is necessary to stabilize the soil, reduce invasion of these areas by exotic weeds, and to accelerate re-establishment of native plant communities. Seven revegetation units were identified on ALE based on soils and potential native plant communities at the site. Native seed mixes and plant material were identified for each area based on the desired plant community. Revegetation of locations affected by decommissioning of buildings and debris removal was undertaken during the winter and early spring of 2010 and 2011, respectively. This report describes both the details of planting and seeding for each of the units, describes the sampling design for monitoring, and summarizes the data collected during the first year of monitoring. In general, the revegetation efforts were successful in establishing native bunchgrasses and shrubs on most of the sites within the 7 revegetation units. Invasion of the revegetation areas by exotic annual species was minimal for most sites, but was above initial criteria in 3 areas: the Hodges Well subunit of Unit 2, and Units 6 and 7.

  19. Engineering Evaluation/Cost Analysis for the 100-N Area Ancillary Facilities and Integration Plan

    International Nuclear Information System (INIS)

    Mukherjee, B.

    1997-09-01

    This document presents the results of an engineering evaluation/cost analysis (EE/CA) that was conducted to evaluate alternatives for addressing final disposition of contaminated buildings and structures in the 100-N Area of the Hanford Site. The Hanford Site is located in southeastern Washington State and is owned by the U.S. Government and operated by the U.S. Department of Energy, Richland Operations Office (RL). In November 1989, the 100 Area of the Hanford Site (as well as the 200, 300, and 1100 Areas) was placed on the U.S. Environmental Protection Agency's National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980. The 100 Area NPL includes the 100-N Area, which is in various stages of the remediation process. It has been determined by RL that hazardous substances in the 100-N Area ancillary facilities may present a potential threat to human health or the environment, and that a non-time critical removal action at these facilities is warranted. To help determine the most appropriate action, RL, in cooperation with the Washington State Department of Ecology (Ecology) and the EPA, has prepared this EE/CA. The scope of the evaluation includes the inactive contaminated ancillary facilities in the 100-N Area, the facilities residing in the buffer zone, and the Hanford Generating Plant (HGP) and the solid waste management units (SWMUs) inside HGP support facilities. The 105-N Reactor and 109-N Heat Exchange facilities are excluded from this EE/CA evaluation

  20. 40 CFR 81.319 - Louisiana.

    Science.gov (United States)

    2010-07-01

    ... Grant Parish La Salle Parish Madison Parish Morehouse Parish Ouachita Parish Richland Parish Tensas... Parish St. James Parish St. John the Baptist Parish St. Landry Parish St. Martin Parish St. Mary Parish... Attainment Pointe Coupee Area: Pointe Coupee Parish Attainment St. James Parish Area: St. James Parish...

  1. Disinfection Contact Time study plan (100-N Area tracer protocol). Revision 1

    International Nuclear Information System (INIS)

    Kretzschmar, S.P.; Bedi, G.S.; Martinez, P.; Ervin, K.

    1996-07-01

    Bechtel Hanford, Inc. will prepare an Engineering Tracer Study Protocol for the determination of contact time for the disinfection process at Group A Non-transient Non-community water treatment plant for the 100-N Water Plant at the Hanford Site in Richland, Washington. Included in this report are the results of a study that determine the actual detention time within the plant clearwell, and thus the disinfection contact time at several clearwell effluent flow rates

  2. Department of Clinical Investigation Annual Research Progress Report, Fiscal Year 1986,

    Science.gov (United States)

    1986-10-01

    sure tracings and the presence or absence of a clinically signif- icant patent ductus arteriosus (PDA) in the neonate and to deter- *? mine if there is...Neck Surg 94:47-55, 1986. Fiore AC, Ivey TO, Misbacli GA, McKeown P, Allen M, Dillard D): Patch Closure of Aortic Annulus Mycotic Aneurysms. Ann Thoracic...Apr 86. Carter PL: Surgery of Morbid obesity. Tacoma Surgical Club, Tacoma, WA, Apr 86. Carter PL, Deyo GA: Pitfalls in Delayed Primary Closure . Ann

  3. Safety of gardening on lead- and arsenic-contaminated urban brownfields.

    Science.gov (United States)

    Defoe, Phillip P; Hettiarachchi, Ganga M; Benedict, Christopher; Martin, Sabine

    2014-11-01

    Elevated levels of lead (Pb) and arsenic (As) are not uncommon for urban soils. Test plots were established at urban gardens in Tacoma and Seattle, WA. The Tacoma site was contaminated with Pb (51-312 mg kg) and As (39-146 mg kg), and the Seattle site had high Pb soil concentrations ranging from 506 to 2022 mg kg and As concentrations of Food-chain transfer of Pb and As were evaluated by measuring plant Pb and As concentrations after kitchen-style washing, a laboratory cleaning procedure, or peeling. The experimental design was a randomized complete block with a split-plot arrangement. Tacoma site treatments included a Class A biosolids mix (TAGRO) with dolomite, and soil at the Seattle site was amended with Cedar-Grove compost (CGC) plus dolomite. TAGRO amendment diluted soil Pb by 10 to 23% and As by 12 to 25% at the Tacoma site, and CGC + dolomite resulted in 20 to 50% dilution in soil Pb at the Seattle site. Both amendments reduced Pb concentrations in vegetables by 50 to 71%, and As reductions ranged from 46 to 80%. At the Tacoma site, Pb concentrations (dry weight basis) in carrots, lettuce, and tomatoes ranged from 8.89 to 25.0, from 0.37 to 3.83, and from 0.54 to 1.24 mg kg, respectively. Plant As concentrations were below 703 μg kg (dry weight) for the vegetables and followed the order lettuce > carrot > tomato. Food-chain transfer of Pb and As in vegetables grown in contaminated urban soils were reduced by laboratory cleaning. Copyright © by the American Society of Agronomy, Crop Science Society of America, and Soil Science Society of America, Inc.

  4. POISONING WITH GAMMA-HYDROXYBUTYRATE, GAMMA-BUTYROLACTONE AND 1.4-BUTANDIOL

    Directory of Open Access Journals (Sweden)

    Miran Brvar

    2002-09-01

    Full Text Available Background. Gamma-hydroxybutyrate (GHB is a popular recreational drug. GHB overdose typically presents with decreased level of consciousness, miosis, bradycardia, respiratory depression and death. Typically, combativeness, confusion and vomiting occur once the patient begins to recover. Gamma-butyrolactone (GBL and 1.4-butandiol (1.4-BD are the prodrugs of GHB and have similar clinical presentation. We present the case of GHB poisoning in Ljubljana.Conclusions. Physicians should suspect GHB poisoning in young ravers who present with CNS depression. Treatment is symptomatic. There is no specific antidote. Gastric lavage is not beneficial but activated charcoal is recommended.

  5. Engineering evaluation cost analysis for the 100-B/C area ancillary facilities at the 108-F Building

    International Nuclear Information System (INIS)

    1996-10-01

    In 1995, the US Department of Energy (DOE), Richland Operations Office (RL) conducted a removal site evaluation of selected facilities in the 100 Area of the Hanford Site in accordance with CERCLA and 40 Code of Federal Regulations (CFR) 300.410. The scope of the evaluation included the aboveground portions of the 108-F Biology Laboratory in the 100-F Area and all inactive ancillary buildings and structures in the 100-B/C Area, excluding the reactor building and the river outfall. Based on the evaluation, RL determined that hazardous substances in the 108-F Biology Laboratory and five of the 100-B/C Area facilities may present a potential threat to human health or the environment, and that a non-time critical removal action at these facilities is warranted. This determination was documented in an engineering evaluation/cost analysis (EE/CA) approval memorandum. The EE/CA approval memorandum is the basis on which to proceed with the performance of an EE/CA to determine the appropriate removal action. This report presents the results of the EE/CA for removal alternatives for final disposition of these six facilities. The EE/CA was conducted pursuant to the requirements of CERCLA and 40 CFR 300.415 and is intended to aid RL and the EPA in selecting a preferred removal action

  6. Integrating pretreatment and retrieval: Results from the July 1997 Tanks Focus Area workshop

    International Nuclear Information System (INIS)

    1998-07-01

    If scientists and researchers working to solve the tank waste challenges, technical program office managers at the tank sites, and others understand the connection between retrieval and pretreatment activities, more efficient processes and reduced costs can be achieved. To make this possible, researchers involved in retrieval and pretreatment activities met at the Conference Center in Richland, Washington, on July 16 and 17, 1997, to discuss the connections between these activities. The purpose of the workshop was to help participants (1) gain a better understanding of retrieval and pretreatment process needs and experiences; (2) gain practical knowledge of the applications, capabilities, and requirements of retrieval and pretreatment technologies being developed and deployed; and (3) focus on identifying and troubleshooting interface issues and problems. The end product of this meeting was to create a checklist of retrieval and pretreatment parameters to consider when developing new technologies or managing work at the sites in these areas. For convenience, the information is also organized by pretreatment parameter and retrieval-pretreatment parameter in Section 5.0

  7. Source term development for the 300 Area Treated Effluent Disposal Facility

    International Nuclear Information System (INIS)

    Bendixsen, R.B.

    1994-04-01

    A novel method for developing a source term for radiation and hazardous material content of sludge processing equipment and barrels in a new waste water treatment facility is presented in this paper. The 300 Area Treated Effluent Disposal Facility (TEDF), located at the Hanford Site near Richland, Washington, will treat process sewer waste water from the 300 Area and discharge a permittable effluent flow into the Columbia River. A process information and hazards analysis document needed a process flowsheet detailing the concentrations of radionuclides, inorganics, and organics throughout the process, including the sludge effluent flow. A hazards analysis for a processing facility usually includes a flowsheet showing the process, materials, heat balances, and instrumentation for that facility. The flow sheet estimates stream flow quantities, activities, compositions, and properties. For the 300 Area TEDF, it was necessary to prepare the flow sheet with all of the information so that radiation doses to workers could be estimated. The noble method used to develop the 300 Area TEDF flowsheet included generating recycle factors. To prepare each component in the flowsheet, precipitation, destruction, and two recycle factors were developed. The factors were entered into a spreadsheet and provided a method of estimating the steady-state concentrations of all of the components in the facility. This report describes how the factors were developed, explains how they were used in developing the flowsheet, and presents the results of using these values to estimate radiation doses for personnel working in the facility. The report concludes with a discussion of the effect of estimates of radioactive and hazardous material concentrations on shielding design and the need for containment features for equipment in the facility

  8. Non-Thermal Treatment of Hanford Site Low-Level Mixed Waste

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-09-01

    DOE proposes to transport contact-handled LLMW from the Hanford Site to the Allied Technology Group (ATG) Mixed Waste Facility (MWF) in Richland, Washington, for non-thermal treatment and to return the treated waste to the Hanford Site for eventual land disposal. Over a 3-year period the waste would be staged to the ATG MWF, and treated waste would be returned to the Hanford Site. The ATG MWF would be located on an 18 hectare (ha) (45 acre [at]) ATG Site adjacent to ATG's licensed low-level waste processing facility at 2025 Battelle Boulevard. The ATG MWF is located approximately 0.8 kilometers (km) (0.5 miles [mi]) south of Horn Rapids Road and 1.6 km (1 mi) west of Stevens Drive. The property is located within the Horn Rapids triangle in northern Richland (Figure 2.1). The ATG MWF is to be located on the existing ATG Site, near the DOE Hanford Site, in an industrial area in the City of Richland. The effects of siting, construction, and overall operation of the MWF have been evaluated in a separate State Environmental Policy Act (SEPA) EIS (City of Richland 1998). The proposed action includes transporting the LLMW from the Hanford Site to the ATG Facility, non-thermal treatment of the LLMW at the ATG MWF, and transporting the waste from ATG back to the Hanford Site. Impacts fi-om waste treatment operations would be bounded by the ATG SEPA EIS, which included an evaluation of the impacts associated with operating the non-thermal portion of the MWF at maximum design capacity (8,500 metric tons per year) (City of Richland 1998). Up to 50 employees would be required for non-thermal treatment portion of the MWF. This includes 40 employees that would perform waste treatment operations and 10 support staff. Similar numbers were projected for the thermal treatment portion of the MWF (City of Richland 1998).

  9. U.S. Army Corps of Engineers and U.S. Department of Energy partnering for cleanup of the 1100 Area, Hanford Site, Washington

    International Nuclear Information System (INIS)

    Johansen, M.; Liias, R.; Chong, R.

    1994-01-01

    The US Department of Energy's Hanford Site was listed on the National Priorities List (NPL) in July 1989 and was divided and listed as four Sites: the 1100 Area, the 100 Area, the 200 Area, and the 300 Area. Each Area was further divided into sub-units called Operable Units. This paper describes Remedial Investigation and Feasibility Study activities for the 1100 Area leading to the first Record of Decision at the Hanford Site. Key issues included: (1) Definition of future land use; risk assessments and resulting remedial actions depended heavily upon future land use definition because no significant exposure pathways currently exist for the Site, (2) Potential impacts of groundwater contamination to a nearby groundwater well field supplying potable water to Richland, (3) Coordination with an offsite potentially responsible party (PRP) from whose property the groundwater contamination emanated, and (4) The development and determination of precedent setting cleanup requirements and approaches for the entire Hanford Site. The US Army Corps of Engineers, Walla Walla District, performed work leading to the signing of the Record of Decision in September, 1993. The Corps continues to perform investigative, design, and remedial action work at areas of the Site including activities supporting the cleanup and ultimate release of two large portions of the Hanford Site known as the Arid Lands Ecology Reserve (ALE) and the North Slope. These two areas comprise more than half of the total area of the entire Hanford reservation

  10. Interim housing conditions profile, Benton and Franklin Counties, Washington: BWIP Repository Project: Working draft

    International Nuclear Information System (INIS)

    Bolton, P.A.

    1987-11-01

    This report describes the housing stock and its availability in Benton and Franklin counties. Depending on the specific measures, data are presented for the entire MSA, for Benton and Franklin counties separately, for incorporated and unincorporated areas within the counties, and for specific incorporated areas. The most detailed data are available for the two counties and for the major cities of Kennewick and Richland in Benton County and Pasco in Franklin County. In 1986, 64 percent of the population of Benton County and 66 percent of the housing units were in Kennewick and Richland. Seventy-three percent of the population and 75 percent of the housing were in the incorporated area of Benton County. In Franklin County, Pasco accounted for 52 percent of the county's 1986 population and 57 percent of its housing. Fifty-nine percent of the population and 63 percent of the housing were in the incorporated areas of Franklin County. More detailed data are needed to fully describe the housing conditions in the jurisdictions described here. 13 refs., 9 tabs

  11. Superconducting magnetic energy storage (SMES) program. Progress report, January 1-December 31, 1982

    International Nuclear Information System (INIS)

    Rogers, J.D.

    1983-05-01

    Work reported is on the development of a 30 MJ superconducting magnetic energy storage (SMES) unit, its installation at the Bonneville Power Administration (BPA) Tacoma Substation, and the preliminary site tests in preparation for its use to stabilize power oscillations on the BPA Pacific AC Inertie. The seismic mounting of the 30 MJ superconducting coil to the dewar lid was completed. The manufacture and testing of the nonconducting dewar were completed. The 5 kV vapor cooled leads were assembled and tested. The refrigerator was placed in operation at the Tacoma Substation and tested by making liquid helium in a 500 l dewar. The refrigerator was connected to the coil dewar and is now used for cooling the 30 MJ coil and dewar with extended purification of the circulating helium to remove contaminants. All equipment was shipped and installed at the BPA Tacoma Substation. Assembly of the 30 MJ coil into the nonconducting dewar was done at the BPA Covington facility and transported to the Tacoma Substation. Substation preparation was completed by 11-1-82. BPA, at considerable expense, did an excellent job preparing the site and assisting with the SMES unit installation. All equipment is in place and operable except for components of the computer control and for full refrigeration of the 30 MJ coil. The converter was tested with the output shorted with the input transformers connected to the 13.8 kV. A new schedule for the SMES operation was established

  12. Environmental Survey preliminary report, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1987-08-01

    This report presents the preliminary findings from the first phase of the Environmental Survey of the United States Department of Energy (DOE) Hanford Site, conducted August 18 through September 5, 1986. The Survey is being conducted by an interdisciplinary team of environmental specialists, led and managed by the Office of Environment, Safety and Health's Office of Environmental Audit. Individual team components are being supplied by a private contractor. The objective of the Survey is to identify environmental problems and areas of environmental risk associated with the Hanford Site. The Survey covers all environmental media and all areas of environmental regulation. It is being performed in accordance with the DOE Environmental Survey Manual. This phase of the Survey involves the review of existing site environmental data, observations of the operations carried on at the Hanford Site, and interviews with site personnel. The Survey team developed a Sampling and Analysis Plan to assist in further assessing certain of the environmental problems identified during its on-site activities. The Sampling and Analysis Plan will be executed by a DOE National Laboratory or a support contractor. When completed, the results will be incorporated into the Environmental Survey Interim Report for the Hanford Site. The Interim Report will reflect the final determinations of the Hanford Site Survey. 44 refs., 88 figs., 74 tabs

  13. Environmental Survey preliminary report, Hanford Site, Richland, Washington

    Energy Technology Data Exchange (ETDEWEB)

    1987-08-01

    This report presents the preliminary findings from the first phase of the Environmental Survey of the United States Department of Energy (DOE) Hanford Site, conducted August 18 through September 5, 1986. The Survey is being conducted by an interdisciplinary team of environmental specialists, led and managed by the Office of Environment, Safety and Health's Office of Environmental Audit. Individual team components are being supplied by a private contractor. The objective of the Survey is to identify environmental problems and areas of environmental risk associated with the Hanford Site. The Survey covers all environmental media and all areas of environmental regulation. It is being performed in accordance with the DOE Environmental Survey Manual. This phase of the Survey involves the review of existing site environmental data, observations of the operations carried on at the Hanford Site, and interviews with site personnel. The Survey team developed a Sampling and Analysis Plan to assist in further assessing certain of the environmental problems identified during its on-site activities. The Sampling and Analysis Plan will be executed by a DOE National Laboratory or a support contractor. When completed, the results will be incorporated into the Environmental Survey Interim Report for the Hanford Site. The Interim Report will reflect the final determinations of the Hanford Site Survey. 44 refs., 88 figs., 74 tabs.

  14. DIGITAL FLOOD INSURANCE RATE MAP DATABASE, RICHLAND COUNTY, SOUTH CAROLINA AND INCORPORATED AREAS

    Data.gov (United States)

    Federal Emergency Management Agency, Department of Homeland Security — The Digital Flood Insurance Rate Map (DFIRM) Database depicts flood risk information and supporting data used to develop the risk data. The primary risk...

  15. Diverse rupture modes for surface-deforming upper plate earthquakes in the southern Puget Lowland of Washington State

    Science.gov (United States)

    Nelson, Alan R.; Personius, Stephen F.; Sherrod, Brian L.; Kelsey, Harvey M.; Johnson, Samuel Y.; Bradley, Lee-Ann; Wells, Ray E.

    2014-01-01

    Earthquake prehistory of the southern Puget Lowland, in the north-south compressive regime of the migrating Cascadia forearc, reflects diverse earthquake rupture modes with variable recurrence. Stratigraphy and Bayesian analyses of previously reported and new 14C ages in trenches and cores along backthrust scarps in the Seattle fault zone restrict a large earthquake to 1040–910 cal yr B.P. (2σ), an interval that includes the time of the M 7–7.5 Restoration Point earthquake. A newly identified surface-rupturing earthquake along the Waterman Point backthrust dates to 940–380 cal yr B.P., bringing the number of earthquakes in the Seattle fault zone in the past 3500 yr to 4 or 5. Whether scarps record earthquakes of moderate (M 5.5–6.0) or large (M 6.5–7.0) magnitude, backthrusts of the Seattle fault zone may slip during moderate to large earthquakes every few hundred years for periods of 1000–2000 yr, and then not slip for periods of at least several thousands of years. Four new fault scarp trenches in the Tacoma fault zone show evidence of late Holocene folding and faulting about the time of a large earthquake or earthquakes inferred from widespread coseismic subsidence ca. 1000 cal yr B.P.; 12 ages from 8 sites in the Tacoma fault zone limit the earthquakes to 1050–980 cal yr B.P. Evidence is too sparse to determine whether a large earthquake was closely predated or postdated by other earthquakes in the Tacoma basin, but the scarp of the Tacoma fault was formed by multiple earthquakes. In the northeast-striking Saddle Mountain deformation zone, along the western limit of the Seattle and Tacoma fault zones, analysis of previous ages limits earthquakes to 1200–310 cal yr B.P. The prehistory clarifies earthquake clustering in the central Puget Lowland, but cannot resolve potential structural links among the three Holocene fault zones.

  16. Disposal of Hanford defense high-level, transuranic and tank wastes, Hanford Site, Richland, Washington. Draft environmental impact statement. Volume 3. Appendices M-V

    International Nuclear Information System (INIS)

    1986-03-01

    The purpose of this Environmental Impact Statement (EIS) is to provide environmental input into the selection and implementation of final disposal actions for high-level, transuranic and tank wastes located at the Hanford Site, Richland, Washington, and into the construction, operation and decommissioning of waste treatment facilities that may be required in implementing waste disposal alternatives. Specifically evaluated are a Hanford Waste Vitrification Plant, Transportable Grout Facility, and a Waste Receiving and Packaging Facility. Also an evaluation is presented to assist in determining whether any additional action should be taken in terms of long-term environmental protection for waste that was disposed of at Hanford prior to 1970 as low-level waste (before the transuranic waste category was established by the AEC) but which might fall into that category if generated today. The alternatives considered in this EIS are: (1) in-place stabilization and disposal, where waste is left in place but is isolated by protective and natural barriers; (2) geologic disposal, where most of the waste (to the extent practicable) is exhumed, treated, segregated, packaged and disposed of in a deep geologic repository; waste classified as high-level would be disposed of in a commercial repository developed pursuant to the Nuclear Waste Policy Act; transuranic waste would be disposed of in the Waste Isolation Pilot Plant near Carlsbad, New Mexico; (3) reference alternative, where some classes of waste are disposed of in geologic repositories and other classes of waste are disposed of by in-place stabilization and disposal; and (4) a ''no disposal'' action alternative (continued storage)

  17. Disposal of Hanford defense high-level, transuranic and tank wastes, Hanford Site, Richland, Washington. Draft environmental impact statement. Volume 2. Appendices A-L

    International Nuclear Information System (INIS)

    1986-03-01

    The purpose of this Environmental Impact Statement (EIS) is to provide environmental input into the selection and implementation of final disposal actions for high-level, transuranic and tank wastes located at the Hanford Site, Richland, Washington, and into the construction, operation and decommissioning of waste treatment facilities that may be required in implementing waste disposal alternatives. Specifically evaluated are a Hanford Waste Vitrification Plant, Transportable Grout Facility, and a Waste Receiving and Packaging Facility. Also an evaluation is presented to assist in determining whether any additional action should be taken in terms of long-term environmental protection for waste that was disposed of at Hanford prior to 1970 as low-level waste (before the transuranic waste category was established by the AEC) but which might fall into that category if generated today. The alternatives considered in this EIS are: (1) in-place stabilization and disposal, where waste is left in place but is isolated by protective and natural barriers; (2) geologic disposal, where most of the waste (to the extent practicable) is exhumed, treated, segregated, packaged and disposed of in a deep geologic repository; waste classified as high-level would be disposed of in a commercial repository developed pursuant to the Nuclear Waste Policy Act; transuranic waste would be disposed of in the Waste Isolation Pilot Plant near Carlsbad, New Mexico; (3) reference alternative, where some classes of waste are disposed of in geologic repositories and other classes of waste are disposed of by in-place stabilization and disposal; and (4) a ''no disposal'' action alternative (continued storage)

  18. Remedial action and waste disposal project: 100-B/C remedial action readiness evaluation plan

    International Nuclear Information System (INIS)

    April, J.G.; Bryant, D.L.; Cislo, G.B.

    1996-06-01

    The Readiness Evaluation Plan presents the methodology used to assess the readiness of the 100-B/C Remedial Action Project. The 100 Areas Remedial Action Project will remediate the 100 Areas liquid waste site identified in the Interim Action Record of Decision for the 100- BC-1, 100-DR-1, and 100-HR-1 Operable Units. These sites are located in the 100 Area of the Hanford Site in Richland, Washington

  19. Hand calculation of safe separation distances between natural gas pipelines and boilers and nuclear facilities in the Hanford site 300 Area

    International Nuclear Information System (INIS)

    Daling, P.M.; Graham, T.M.

    1999-01-01

    The US Department of Energy has undertaken a project to reduce energy expenditures and improve energy system reliability in the 300 Area of the Hanford Site near Richland, Washington. This project replaced the centralized heating system with heating units for individual buildings or groups of buildings, constructed a new natural-gas distribution system to provide a fuel source for many of these units, and constructed a central control building to operate and maintain the system. The individual heating units include steam boilers that are housed in individual annex buildings located in the vicinity of a number of nuclear facilities operated by the Pacific Northwest National Laboratory (PNNL). The described analysis develops the basis for siting the package boilers and natural-gas distribution system used to supply steam to PNNL's 300 Area nuclear facilities. Minimum separation distances that would eliminate or reduce the risks of accidental dispersal of radioactive and hazardous materials in nearby nuclear facilities were calculated based on the effects of four potential fire and explosion (detonation) scenarios involving the boiler and natural-gas distribution system. These minimum separation distances were used to support siting decisions for the boilers and natural-gas pipelines

  20. Development of user applications for earth resources survey data in urban and regional planning in the Puget Sound area

    Science.gov (United States)

    Westerlund, F. V.

    1975-01-01

    User applications of remote sensing in Washington State are described. The first project created a multi-temporal land use/land cover data base for the environs of the Seattle-Tacoma International Airport, to serve planning and management operations of the Port of Seattle. The second is an on-going effort to develop a capability within the Puget Sound Governmental Conference, a council of governments (COG), to inventory and monitor land use within its four county jurisdiction. Developmental work has focused on refinement of land use/cover classification systems applicable at this regional scale and various levels of detail in relation to program requirements of the agency. Related research, refinement of manual methods, user training and approaches to technology transfer are discussed.

  1. Assessment of the Plutonium Finishing Plant Criticality Alarm System U.S. Department of Energy Richland Operations Office

    International Nuclear Information System (INIS)

    NIRIDER, L.T.

    2002-01-01

    At the request of the Assistant Manager for Safety and Engineering, the U.S. Department of Energy Richland Operations Office (RL) Engineering Support Division, performed an oversight review of the Plutonium Finishing Plant (PFP) nuclear Criticality Alarm System (CAS). The review was conducted to satisfy requirements and agreements associated with Defense Nuclear Facility Safety Board (DNFSB) Recommendation 2000-2, ''Vital Safety Systems.'' The PFP is managed by Fluor Hanford, Inc. for RL. The field assessment and staff interviews were conducted August 12 through August 19,2002. This was a limited scope assessment that consisted of a review of the nuclear CAS operations, maintenance, and compliance with National Consensus Standards Requirements. The main purpose of the assessment was to determine the adequacy of the existing alarm system and its associated infrastructure to support the PFP facility mission through the remaining facility lifetime. The Review Plan was modeled upon Criteria and Review Approach Documents (CRAD) developed for DNFSB Recommendation 2000-2 reviews conducted across the Hanford Site. Concerns regarding component degradation and failure, increasing numbers of occurrence reports associated with the alarm system, and reliability issues were addressed. Additionally, RL performed a review of the engineering aspects of the CAS including the functions of design authorities and aspects of systems engineering. However, the focus of the assessment was on operations, maintenance, and reliability of the CAS, associated procurement practices, adequacy of safety and engineering policies and procedures, safety documentation, and fundamental engineering practices including training, qualification, and systems engineering. This assessment revealed that the PFP CAS and its associated infrastructure, administrative procedures, and conduct of operations are generally effective. There are no imminent criticality safety issues associated with the operation of the

  2. Borehole data package for well 299-W15-41 at single-shell tank waste management Area TX-TY

    International Nuclear Information System (INIS)

    Horton, D.G.; Hodges, F.N.

    2000-01-01

    One new Resource Conservation and Recovery Act (RCRA) groundwater monitoring well was installed at the single-shell tank farm Waste Management Area (WMA) TX-TY during December 1999 and January 2000 in fulfillment of Tri-Party Agreement (Ecology 1996) milestone M-24-43. The well is 299-W15-41 and is located south of the 241-TX tank farm and south of 20th Street in the 200 West Area. A figure shows the locations of all wells in the WMA TX-TY monitoring network. The new well was constructed to the specifications and requirements described in Washington Administrative Code (WAC) 173-160 and WAC 173-303, the groundwater monitoring plan for WMA TX-TY (Caggiano and Goodwin 1991), the assessment plan for WMA TX-TY (Caggiano and Chou 1993), and the description of work for well drilling and installation. This document compiles information on the drilling and construction, well development, pump installation, and sediment testing applicable to well 299-W1 5-41. Appendix A contains the geologist's log, the Well Construction Summary Report, and Well Summary Sheet (as-built diagram) and Appendix B contains borehole geophysical logs. Additional documentation concerning well construction is on file with Bechtel Hanford, Inc., Richland, Washington

  3. Integrity assessment plan for PNL 300 area radioactive hazardous waste tank system. Final report

    International Nuclear Information System (INIS)

    1996-03-01

    The Pacific Northwest Laboratory (PNL), operated by Battelle Memorial Institute under contract to the U.S. Department of Energy, operates tank systems for the U.S. Department of Energy, Richland Operations Office (DOE-RL), that contain dangerous waste constituents as defined by Washington State Department of Ecology (WDOE) Dangerous Waste Regulations, Washington Administrative Code (WAC) 173-303-040(18). Chapter 173-303-640(2) of the WAC requires the performance of integrity assessments for each existing tank system that treats or stores dangerous waste, except those operating under interim status with compliant secondary containment. This Integrity Assessment Plan (IAP) identifies all tasks that will be performed during the integrity assessment of the PNL-operated Radioactive Liquid Waste Systems (RLWS) associated with the 324 and 325 Buildings located in the 300 Area of the Hanford Site. It describes the inspections, tests, and analyses required to assess the integrity of the PNL RLWS (tanks, ancillary equipment, and secondary containment) and provides sufficient information for adequate budgeting and control of the assessment program. It also provides necessary information to permit the Independent, Qualified, Registered Professional Engineer (IQRPE) to approve the integrity assessment program

  4. Integrity assessment plan for PNL 300 area radioactive hazardous waste tank system. Final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-03-01

    The Pacific Northwest Laboratory (PNL), operated by Battelle Memorial Institute under contract to the U.S. Department of Energy, operates tank systems for the U.S. Department of Energy, Richland Operations Office (DOE-RL), that contain dangerous waste constituents as defined by Washington State Department of Ecology (WDOE) Dangerous Waste Regulations, Washington Administrative Code (WAC) 173-303-040(18). Chapter 173-303-640(2) of the WAC requires the performance of integrity assessments for each existing tank system that treats or stores dangerous waste, except those operating under interim status with compliant secondary containment. This Integrity Assessment Plan (IAP) identifies all tasks that will be performed during the integrity assessment of the PNL-operated Radioactive Liquid Waste Systems (RLWS) associated with the 324 and 325 Buildings located in the 300 Area of the Hanford Site. It describes the inspections, tests, and analyses required to assess the integrity of the PNL RLWS (tanks, ancillary equipment, and secondary containment) and provides sufficient information for adequate budgeting and control of the assessment program. It also provides necessary information to permit the Independent, Qualified, Registered Professional Engineer (IQRPE) to approve the integrity assessment program.

  5. Waste analysis plan for the low-level burial grounds

    International Nuclear Information System (INIS)

    Barnes, B.M.

    1996-01-01

    This waste analysis plan (WAP) has been prepared for the Low-Level Burial Grounds that are located in the 200 East and 200 West Areas of the Hanford Facility, Richland, Washington. This WAP documents the methods used to characterize and obtain and analyze representative samples of waste managed at this unit

  6. Preoperational baseline and site characterization report for the Environmental Restoration Disposal Facility: Volume 1. Revision 1

    International Nuclear Information System (INIS)

    Weekes, D.C.; Ford, B.H.; Jaeger, G.K.

    1996-09-01

    This site characterization report provides the results of the field data collection activities for the Environmental Restoration Disposal Facility site. Information gathered on the geology, hydrology, ecology, chemistry, and cultural resources of the area is presented. The Environmental Restoration Disposal Facility is located at the Hanford Site in Richland, Washington

  7. Waste analysis plan for the low-level burial grounds

    Energy Technology Data Exchange (ETDEWEB)

    Haas, C.R.

    1996-09-19

    This waste analysis plan (WAP) has been prepared for the Low-Level Burial Grounds (LLBG) which are located in the 200 East and West Areas of the Hanford Facility, Richland, Washington. This WAP documents the methods used to characterize, and obtain and analyze representative samples of waste managed at this unit.

  8. Design criteria and design basis for the 100-HR-3 and 100-KR-4 pump-and-treat projects

    International Nuclear Information System (INIS)

    McKinley, W.S.; Winters, J.N.

    1996-06-01

    The 100-HR-3 and 100-KR-4 Operable Units are located in the 100 Area at the Hanford Site in Richland, Washington. The document describes the project objectives and design criteria to be used for the 100-HR-3 and 100-KR-4 groundwater pump-and-treat design activities

  9. Cultural Resources Review for Closure of the nonradioactive Dangerous Waste Landfill and Solid Waste Landfill in the 600 Area, Hanford Site, Benton County, Washington, HCRC# 2010-600-018R

    Energy Technology Data Exchange (ETDEWEB)

    Gutzeit, Jennifer L.; Kennedy, Ellen P.; Bjornstad, Bruce N.; Sackschewsky, Michael R.; Sharpe, James J.; DeMaris, Ranae; Venno, M.; Christensen, James R.

    2011-02-02

    The U.S. Department of Energy Richland Operations Office is proposing to close the Nonradioactive Dangerous Waste Landfill (NRDWL) and Solid Waste Landfill (SWL) located in the 600 Area of the Hanford Site. The closure of the NRDWL/SWL entails the construction of an evapotranspiration cover over the landfill. This cover would consist of a 3-foot (1-meter) engineered layer of fine-grained soil, modified with 15 percent by weight pea gravel to form an erosion-resistant topsoil that will sustain native vegetation. The area targeted for silt-loam borrow soil sits in Area C, located in the northern central portion of the Fitzner/Eberhardt Arid Lands Ecology (ALE) Reserve Unit. The pea gravel used for the mixture will be obtained from both off-site commercial sources and an active gravel pit (Pit #6) located just west of the 300 Area of the Hanford Site. Materials for the cover will be transported along Army Loop Road, which runs from Beloit Avenue (near the Rattlesnake Barricade) east-northeast to the NRDWL/SWL, ending at State Route 4. Upgrades to Army Loop Road are necessary to facilitate safe bidirectional hauling traffic. This report documents a cultural resources review of the proposed activity, conducted according to Section 106 of the National Historic Preservation Act of 1966.

  10. 327 Building fire hazards analysis implementation plan

    International Nuclear Information System (INIS)

    BARILO, N.F.

    1999-01-01

    In March 1998, the 327 Building Fire Hazards Analysis (FHA) (Reference 1) was approved by the U.S. Department of Energy, Richland Operations Office (DOE-E) for implementation by B and W Hanford Company (BWC). The purpose of the FHA was to identify gaps in compliance with DOE Order 5480.7A (Reference 2) and Richland Operations Office Implementation Directive (RLID) 5480.7 (Reference 3), especially in regard to loss limitation. The FHA identified compliance gaps in five areas and provided nine recommendations (11 items) to bring the 327 Building into compliance. A status is provided for each recommendation in this document. BWHC will use this Implementation Plan to bring the 327 Building and its operation into compliance with DOE Order 5480.7A and IUD 5480.7

  11. Environmental Management Performance Report for December 1999

    Energy Technology Data Exchange (ETDEWEB)

    EDER, D.M.

    2000-02-16

    The purpose of the Environmental Management Performance Report (EMPR) is to provide the Department of Energy Richland Operations Office's (DOE-RL's) report of Hanford's Environmental Management (EM) performance by: U. S. Department of Energy, Richland Operations Office, Project Hanford Management Contract (PHMC) through Fluor Hanford, Inc. (FHI) and its subcontractors, Environmental Restoration Contract through Bechtel Hanford, Inc. (BHI), and its subcontractors, and Pacific Northwest National Laboratories (PNNL) for EM and EM Science and Technology (S&T) Mission. This report is a monthly publication that summarizes EM Site performance under RL Operations Office. It is organized by the four sections listed above, with each section containing an Executive Summary and Area Performance Summaries. A listing of what is contained in the sections can be found in the Table of Contents.

  12. Addendum to the RCRA Assessment Report for Single-Shell Tank Waste Management Area S-SX at the Hanford Site

    International Nuclear Information System (INIS)

    Chou, C.J.; Johnson, V.G.

    1999-01-01

    The initial Resource Conservation and Recovery Act (RCRA) groundwater quality assessment report for Waste Management Area S-SX (PNNL-11810) was issued in January 1998. The report stated a plan for conducting continued assessment would be developed after addressing Washington State Department of Ecology (Ecology) comments on initial findings in PNNL-11810. Comments from Ecology were received by US Department of Energy, Richland Operations Office (DOE-RL) on September 24, 1998. Shortly thereafter, Ecology and DOE began dispute resolution and related negotiations about tank farm vadose issues. This led to proposed new Tri-Party Agreement milestones covering a RCRA Facility Investigation-Corrective Measures Study (RFI/CMS) of the four single-shell tank farm waste management areas that were in assessment status (Waste Management Areas B-BX-BY, S-SX, T and TX-TY). The RCRA Facility Investigation includes both subsurface (vadose zone and groundwater) and surface (waste handling facilities and grounds) characterization. Many of the Ecology comments on PNNL-11810 are more appropriate for, and in many cases are superseded by, the RFI/CMS at Waste Management Area S-SX. The proposed Tri-Party Agreement milestone changes that specify the scope and schedule for the RFI/CMS work plans (Tri-Party Agreement change number M-45-98-0) were issued for public comment in February 1999. The Tri-Party Agreement narrative indicates the ongoing groundwater assessments will be integrated with the RFI/CMS work plans. This addendum documents the disposition of the Ecology comments on PNNL-11810 and identifies which comments were more appropriate for the RFI/CMS work plan

  13. Addendum to the RCRA Assessment Report for Single-Shell Tank Waste Management Area S-SX at the Hanford Site

    Energy Technology Data Exchange (ETDEWEB)

    Chou, C.J.; Johnson, V.G.

    1999-10-07

    The initial Resource Conservation and Recovery Act (RCRA) groundwater quality assessment report for Waste Management Area S-SX (PNNL-11810) was issued in January 1998. The report stated a plan for conducting continued assessment would be developed after addressing Washington State Department of Ecology (Ecology) comments on initial findings in PNNL-11810. Comments from Ecology were received by US Department of Energy, Richland Operations Office (DOE-RL) on September 24, 1998. Shortly thereafter, Ecology and DOE began dispute resolution and related negotiations about tank farm vadose issues. This led to proposed new Tri-Party Agreement milestones covering a RCRA Facility Investigation-Corrective Measures Study (RFI/CMS) of the four single-shell tank farm waste management areas that were in assessment status (Waste Management Areas B-BX-BY, S-SX, T and TX-TY). The RCRA Facility Investigation includes both subsurface (vadose zone and groundwater) and surface (waste handling facilities and grounds) characterization. Many of the Ecology comments on PNNL-11810 are more appropriate for, and in many cases are superseded by, the RFI/CMS at Waste Management Area S-SX. The proposed Tri-Party Agreement milestone changes that specify the scope and schedule for the RFI/CMS work plans (Tri-Party Agreement change number M-45-98-0) were issued for public comment in February 1999. The Tri-Party Agreement narrative indicates the ongoing groundwater assessments will be integrated with the RFI/CMS work plans. This addendum documents the disposition of the Ecology comments on PNNL-11810 and identifies which comments were more appropriate for the RFI/CMS work plan.

  14. Waste Analysis Plan for the Low-Level Burial Grounds [CANCELLED] Reissued as HNF-5841

    International Nuclear Information System (INIS)

    ELLEFSON, M.D.

    2000-01-01

    Canceled see HNF-5841 Rev 0. This waste analysis plan (WAP) has been prepared for the Low-Level Burial Grounds which are located in the 200 East and West Areas of the Hanford Facility, Richland, Washington. This WAP documents the methods used to characterize, obtain and analyze representative samples of waste managed at this unit

  15. 324 Building fire hazards analysis implementation plan

    International Nuclear Information System (INIS)

    BARILO, N.F.

    1999-01-01

    In March 1998, the 324 Building Fire Hazards Analysis (FHA) (Reference 1) was approved by the U S. Department of Energy, Richland Operations Office (DOE-RL) for implementation by B and W Hanford Company (BWHC). The purpose of the FHA was to identify gaps in compliance with DOE Order 5480.7A (Reference 2) and Richland Operations Office Implementation Directive (RLID) 5480.7 (Reference 3), especially in regard to loss limitation. The FHA identified compliance gaps in six areas and provided 20 recommendations to bring the 324 Building into compliance with DOE Order 5480 7A. Additionally, one observation was provided. A status is provided for each recommendation in this document. The actions for recommendations associated with the safety related part of the 324 Building and operation of the cells and support areas were evaluated using the Unreviewed Safety Question (USQ) process BWHC will use this Implementation Plan to bring the 324 Building and its operation into compliance with DOE Order 5480 7A and RLID 5480.7

  16. System-Scale Model of Aquifer, Vadose Zone, and River Interactions for the Hanford 300 Area - Application to Uranium Reactive Transport

    Energy Technology Data Exchange (ETDEWEB)

    Rockhold, Mark L.; Bacon, Diana H.; Freedman, Vicky L.; Parker, Kyle R.; Waichler, Scott R.; Williams, Mark D.

    2013-10-01

    This report represents a synthesis and integration of basic and applied research into a system-scale model of the Hanford 300 Area groundwater uranium plume, supported by the U.S. Department of Energy’s Richland Operations (DOE-RL) office. The report integrates research findings and data from DOE Office of Science (DOE-SC), Office of Environmental Management (DOE-EM), and DOE-RL projects, and from the site remediation and closure contractor, Washington Closure Hanford, LLC (WCH). The three-dimensional, system-scale model addresses water flow and reactive transport of uranium for the coupled vadose zone, unconfined aquifer, and Columbia River shoreline of the Hanford 300 Area. The system-scale model of the 300 Area was developed to be a decision-support tool to evaluate processes of the total system affecting the groundwater uranium plume. The model can also be used to address “what if” questions regarding different remediation endpoints, and to assist in design and evaluation of field remediation efforts. For example, the proposed cleanup plan for the Hanford 300 Area includes removal, treatment, and disposal of contaminated sediments from known waste sites, enhanced attenuation of uranium hot spots in the vadose and periodically rewetted zone, and continued monitoring of groundwater with institutional controls. Illustrative simulations of polyphosphate infiltration were performed to demonstrate the ability of the system-scale model to address these types of questions. The use of this model in conjunction with continued field monitoring is expected to provide a rigorous basis for developing operational strategies for field remediation and for defining defensible remediation endpoints.

  17. Construction close-out report for 1100-EM-1, 1100-EM-2, and 1100-EM-3 operable units, Hanford, Washington

    International Nuclear Information System (INIS)

    1996-04-01

    This report provides summary descriptions of waste sites, remedial investigations, cleanup actions, and revegetation, as well as other information about the 1100 Area at the Hanford Site, in Richland, Washington. The intent is to provide the documentation necessary for the close-out of remedial work in the 1100 Area and for the delisting from the National Priorities List (NPL). The content and format of this report follows the U.S. Environmental Protection Agency (EPA) guidance

  18. Performance and Costs of Ductless Heat Pumps in Marine-Climate High-Performance Homes -- Habitat for Humanity The Woods

    Energy Technology Data Exchange (ETDEWEB)

    Lubliner, Michael [Building America Partnership for Improved Residential Construction, Olympia, WA (United States). Washington States Univ. Energy Program; Howard, Luke [Building America Partnership for Improved Residential Construction, Olympia, WA (United States). Washington States Univ. Energy Program; Hales, David [Building America Partnership for Improved Residential Construction, Olympia, WA (United States). Washington States Univ. Energy Program; Kunkle, Rick [Building America Partnership for Improved Residential Construction, Olympia, WA (United States). Washington States Univ. Energy Program; Gordon, Andy [Building America Partnership for Improved Residential Construction, Olympia, WA (United States). Washington States Univ. Energy Program; Spencer, Melinda [Building America Partnership for Improved Residential Construction, Olympia, WA (United States). Washington States Univ. Energy Program

    2016-02-18

    The Woods is a Habitat for Humanity (HFH) community of ENERGY STAR Homes Northwest (ESHNW)-certified homes located in the marine climate of Tacoma/Pierce County, Washington. This research report builds on an earlier preliminary draft 2014 BA report, and includes significant billing analysis and cost effectiveness research from a collaborative, ongoing Ductless Heat Pump (DHP)research effort for Tacoma Public Utilities (TPU) and Bonneville Power Administration (BPA). This report focuses on the results of field testing, modeling, and monitoring of ductless mini-split heat pump hybrid heating systems in seven homes built and first occupied at various times between September 2013 and October 2014. The report also provides WSU documentation of high-performance home observations, lessons learned, and stakeholder recommendations for builders of affordable high-performance housing such as HFH. Tacoma Public Utilities (TPU) and Bonneville Power Administration (BPA). This report focuses on the results of field testing, modeling, and monitoring of ductless mini-split heat pump hybrid heating systems in seven homes built and first occupied at various times between September 2013 and October 2014. The report also provides WSU documentation of high-performance home observations, lessons learned, and stakeholder recommendations for builders of affordable high-performance housing such as HFH.

  19. Decommissioning of the 105-F and 105-H fuel storage basin in the 100 Area at the Hanford Site

    International Nuclear Information System (INIS)

    Griffin, P.W.

    1991-09-01

    The US Department of Energy (DOE) owns the eight surplus production reactors at the Hanford Site north of Richland, Washington. The fuel storage basins at the 105-F and 105-H reactors were filled with equipment, associated with the operation of the basins and clean fill in 1970. This was done to stabilize the residual sediment and a few feet of water in the reactors' fuel storage basins. This project investigates the subject basins to locate and remove overlooked fuel elements left in the basins

  20. Criticality codes migration to workstations at the Hanford site

    International Nuclear Information System (INIS)

    Miller, E.M.

    1993-01-01

    Westinghouse Hanford Company, Hanford Site Operations contractor, Richland, Washington, currently runs criticality codes on the Cray X-MP EA/232 computer but has recommended that US Department of Energy DOE-Richland replace the Cray with more economical workstations

  1. 75 FR 70294 - Notice of Determinations Regarding Eligibility To Apply for Worker Adjustment Assistance

    Science.gov (United States)

    2010-11-17

    ...,240 Baker Hughes Oilfield Broussard, LA......... June 8, 2009. Operations, Leased Workers from Kelly... Center. 74,726 Weldco-Beales Manufacturing Tacoma, WA October 12, 2009. 74,740 Bekaert Corporation, Vista...

  2. Environmental Management Performance Report 11/1999

    Energy Technology Data Exchange (ETDEWEB)

    EDER, D.M.

    2000-02-01

    The purpose of the Environmental Management Performance Report (EMPR) is to provide the Department of Energy Richland Operations Office's (DOE-RL's) report of Hanford's Environmental Management performance by: US Department of Energy, Richland Operation

  3. Environmental surveillance master sampling schedule

    International Nuclear Information System (INIS)

    Bisping, L.E.

    1997-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest National Laboratory (PNNL)(a) for the US Department of Energy (DOE). This document contains the planned 1997 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP) and Drinking Water Monitoring Project. In addition, Section 3.0, Biota, also reflects a rotating collection schedule identifying the year a specific sample is scheduled for collection. The purpose of these monitoring projects is to evaluate levels of radioactive and nonradioactive pollutants in the Hanford environs, as required in DOE Order 5400.1, General Environmental Protection Program, and DOE Order 5400.5, Radiation Protection of the Public and the Environment. The sampling methods will be the same as those described in the Environmental Monitoring Plan, US Department of Energy, Richland Operations Office, DOE/RL91-50, Rev. 1, US Department of Energy, Richland, Washington

  4. Analysis of selected gravity profiles on the Hanford Reservation, Richland, Washington

    International Nuclear Information System (INIS)

    Little, J.T.; Richard, B.H.

    1977-07-01

    Regional gravity surveys have been conducted on the Hanford Reservation in the past. This analysis is an attempt at detailed gravity profiling over selected areas of the reservation. Over 450 gravity readings were taken during the summer of 1976. The Bouguer anomaly values of these stations, along with facies cross sections, were used to construct two-dimensional models. The models depict the buried basalt bedrock surface and the overlying sedimentary cover of the areas selected for profiling. In the eastern section of the reservation, the interpretation of the data suggests that there are three major buried valleys cut into the bedrock. These channels are most likely a combination of structural downwarping and erosion of these downwarps by an ancestral Columbia River. Along the western boundary of the reservation there are two closed depressions which are believed to be the result of the sub-fluvial vortex effect of Kolk erosion. It was found that, although two-dimensional gravity models are useful in determining the buried bedrock surface, they are ineffectual in delineating sedimentary contacts

  5. Biological assessment for the remedial action at the chemical plant area of the Weldon Spring site

    Energy Technology Data Exchange (ETDEWEB)

    Hlohowskyj, I.; Dunn, C.P.

    1992-11-01

    The Weldon Spring site in St.Charles County, Missouri, became contaminated during the 1940s through the 1960s as a result of explosives production by the US Army and uranium and thorium processing by the predecessor agency of the US Department of Energy (DOE). The site is listed on the National Priorities List of the US Environmental Protection Agency, and DOE is responsible for its cleanup. Contaminants are present in soil, surface water, and aquatic sediments. Alternatives identified for site remediation are no action (included as baseline for comparison), treatment and disposal of the wastes at the Weldon Spring site, and on-site treatment followed by off-site disposal at either a commercial facility near Clive, Utah, or at DOE`s Hanford site near Richland, Washington. In accordance with the requirements of the Endangered Species Act, this biological assessment has been prepared to evaluate the potential effects of proposed remedial action alternatives on federal listed (endangered or threatened) and candidate species at the respective sites. The assessment includes consideration of the environmental setting at each site; the federal listed and candidate species that could occur at each site; the construction, excavation, and treatment activities under each alternative; and the amount of land area affected at each site.

  6. Biological assessment for the remedial action at the chemical plant area of the Weldon Spring site

    Energy Technology Data Exchange (ETDEWEB)

    Hlohowskyj, I.; Dunn, C.P.

    1992-11-01

    The Weldon Spring site in St.Charles County, Missouri, became contaminated during the 1940s through the 1960s as a result of explosives production by the US Army and uranium and thorium processing by the predecessor agency of the US Department of Energy (DOE). The site is listed on the National Priorities List of the US Environmental Protection Agency, and DOE is responsible for its cleanup. Contaminants are present in soil, surface water, and aquatic sediments. Alternatives identified for site remediation are no action (included as baseline for comparison), treatment and disposal of the wastes at the Weldon Spring site, and on-site treatment followed by off-site disposal at either a commercial facility near Clive, Utah, or at DOE's Hanford site near Richland, Washington. In accordance with the requirements of the Endangered Species Act, this biological assessment has been prepared to evaluate the potential effects of proposed remedial action alternatives on federal listed (endangered or threatened) and candidate species at the respective sites. The assessment includes consideration of the environmental setting at each site; the federal listed and candidate species that could occur at each site; the construction, excavation, and treatment activities under each alternative; and the amount of land area affected at each site.

  7. Tri-Cities Index of Innovation and Technology

    Energy Technology Data Exchange (ETDEWEB)

    Fowler, Richard A.; Scott, Michael J.; Butner, Ryan S.

    2011-01-17

    In 2001 and 2004, the Economic Development Office of Pacific Northwest National Laboratory published companion reports to the Washington Technology Center Index studies that provided additional information on the Tri-Cities (Kennewick-Richland-Pasco) area of the state, its technology businesses, and important advantages that the Tri-Cities have as places to live and do business. These reports also compared the Tri-Cities area to other technology-based metropolitan areas in the Pacific Northwest and nation along critical dimensions known to be important to technology firms. This report updates the material in these earlier reports, and highlights a growing Tri-Cities metropolitan area.

  8. Hanford soil partitioning and vapor extraction study

    International Nuclear Information System (INIS)

    Yonge, D.; Hossain, A.; Cameron, R.; Ford, H.; Storey, C.

    1996-07-01

    This report describes the testing and results of laboratory experiments conducted to assist the carbon tetrachloride soil vapor extraction project operating in the 200 West Area of the Hanford Site in Richland, Washington. Vapor-phase adsorption and desorption testing was performed using carbon tetrachloride and Hanford Site soils to estimate vapor-soil partitioning and reasonably achievable carbon tetrachloride soil concentrations during active vapor extractions efforts at the 200 West Area. (CCl 4 is used in Pu recovery from aqueous streams.)

  9. 327 Building fire hazards analysis implementation plan

    International Nuclear Information System (INIS)

    Eggen, C.D.

    1998-01-01

    In March 1998, the 327 Building Fire Hazards Analysis (FRA) (Reference 1) was approved by the US Department of Energy, Richland Operations Office (DOE-RL) for implementation by B and W Hanford Company (B and WHC). The purpose of the FHA was to identify gaps in compliance with DOE Order 5480.7A (Reference 2) and Richland Operations Office Implementation Directive (RLID) 5480.7 (Reference 3), especially in regard to loss limitation. The FHA identified compliance gaps in five areas and provided nine recommendations (11 items) to bring the 327 Building into compliance. To date, actions for five of the 11 items have been completed. Exemption requests will be transmitted to DOE-RL for two of the items. Corrective actions have been identified for the remaining four items. The completed actions address combustible loading requirements associated with the operation of the cells and support areas. The status of the recommendations and actions was confirmed during the July 1998 Fire Protection Assessment. B and WHC will use this Implementation Plan to bring the 327 Building and its operation into compliance with DOE Order 5480.7A and RLID 5480.7

  10. 78 FR 73881 - National Register of Historic Places; Notification of Pending Nominations and Related Actions

    Science.gov (United States)

    2013-12-09

    ... review, we cannot guarantee that we will be able to do so. Dated: November 21, 2013. J. Paul Loether... Central Elementary School, 401 S. 8th St., Tacoma, 13000998 Spokane County Garland Theater, (Movie...

  11. 75 FR 40816 - Sunshine Act Meeting Notice

    Science.gov (United States)

    2010-07-14

    ... Matters, Reliability, Security and Market Operations A-3 AD10-15-000...... Smart Grid Update...-2 UL09-1-002....... L.S. Starrett Company. H-3 P-460-033........ City of Tacoma, Washington. P-460...

  12. Environmental Assessment: Relocation and storage of TRIGA reg-sign reactor fuel, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1995-08-01

    In order to allow the shutdown of the Hanford 308 Building in the 300 Area, it is proposed to relocate fuel assemblies (101 irradiated, three unirradiated) from the Mark I TRIGA Reactor storage pool. The irradiated fuel assemblies would be stored in casks in the Interim Storage Area in the Hanford 400 Area; the three unirradiated ones would be transferred to another TRIGA reactor. The relocation is not expected to change the offsite exposure from all Hanford Site 300 and 400 Area operations

  13. Results of Phase I groundwater quality assessment for single-shell tank waste management areas T and TX-TY at the Hanford Site

    International Nuclear Information System (INIS)

    Hodges, F.N.

    1998-01-01

    Pacific Northwest National Laboratory (PNNL) conducted a Phase I, Resource Conservation and Recovery Act of 1976 (RCRA) groundwater quality assessment for the Richland Field Office of the U.S. Department of Energy (DOE-RL) under the requirements of the Federal Facility Compliance Agreement. The purpose of the investigation was to determine if the Single-Shell Tank Waste Management Areas (WMAs) T and TX-TY have impacted groundwater quality. Waste Management Areas T and TX-TY, located in the northern part of the 200 West Area of the Hanford Site, contain the 241-T, 241-TX, and 241-TY tank farms and ancillary waste systems. These two units are regulated under RCRA interim-status regulations (under 40 CFR 265.93) and were placed in assessment groundwater monitoring because of elevated specific conductance in downgradient wells. Anomalous concentrations of technetium-99, chromium, nitrate, iodine-129, and cobalt-60 also were observed in some downgradient wells. Phase I assessment, allowed under 40 CFR 265, provides the owner-operator of a facility with the opportunity to show that the observed contamination has a source other than the regulated unit. For this Phase I assessment, PNNL evaluated available information on groundwater chemistry and past waste management practices in the vicinity of WMAs T and TX-TY. Background contaminant concentrations in the vicinity of WMAs T and TX-TY are the result of several overlapping contaminant plumes resulting from past-practice waste disposal operations. This background has been used as baseline for determining potential WMA impacts on groundwater

  14. 1995 annual 100-NR-2 groundwater summary report

    International Nuclear Information System (INIS)

    Borghese, J.V.; Johnson, V.M.; Walker, L.D.

    1996-09-01

    The 100-NR-2 Operable Unit (OU) is located in the north-central part of the Hanford Site along the southern shoreline of the Columbia River in Richland, Washington. The 100-N Area is bordered by the Columbia River and the 600 Area (the portion of the Hanford Site that surrounds the primary operations areas). The purpose of this document is to provide the 1995 groundwater sampling data for the 100-NR-2 groundwater OU. Also included are the analytical results for sampling rounds 7 and 8 that were conducted during March and September 1995 for 100-NR-2

  15. Westinghouse Hanford Company risk management strategy for retired surplus facilities

    International Nuclear Information System (INIS)

    Taylor, W.E.; Coles, G.A.; Shultz, M.V.; Egge, R.G.

    1993-09-01

    This paper describes an approach that facilitates management of personnel safety and environmental release risk from retired, surplus Westinghouse Hanford Company-managed facilities during the predemolition time frame. These facilities are located in the 100 and 200 Areas of the 1,450-km 2 (570-mi 2 ) Hanford Site in Richland, Washington. The production reactors are located in the 100 Area and the chemical separation facilities are located in the 200 Area. This paper also includes a description of the risk evaluation process, shows applicable results, and includes a description of comparison costs for different risk reduction options

  16. Environmental assessment, K Pool fish rearing, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1996-12-01

    The US Department of Energy (DOE) has a need to respond to a request to lease facilities at the Hanford Site 100-KE and 100-KW filter plant pools (K Pools) for fish rearing activities. These fish rearing activities would be: (1) business ventures with public and private funds and (2) long-term enhancement and supplementation programs for game fish populations in the Columbia River Basin. The proposed action is to enter into a use permit or lease agreement with the YIN or other parties who would rear fish in the 100-K Area Pools. The proposed action would include necessary piping, pump, and electrical upgrades of the facility; cleaning and preparation of the pools; water withdrawal from the Columbia River, and any necessary water or wastewater treatment; and introduction, rearing and release of fish. Future commercial operations may be included

  17. Environmental assessment, K Pool fish rearing, Hanford Site, Richland, Washington

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-12-01

    The US Department of Energy (DOE) has a need to respond to a request to lease facilities at the Hanford Site 100-KE and 100-KW filter plant pools (K Pools) for fish rearing activities. These fish rearing activities would be: (1) business ventures with public and private funds and (2) long-term enhancement and supplementation programs for game fish populations in the Columbia River Basin. The proposed action is to enter into a use permit or lease agreement with the YIN or other parties who would rear fish in the 100-K Area Pools. The proposed action would include necessary piping, pump, and electrical upgrades of the facility; cleaning and preparation of the pools; water withdrawal from the Columbia River, and any necessary water or wastewater treatment; and introduction, rearing and release of fish. Future commercial operations may be included.

  18. Teaching the Physics of Energy While Traveling by Train

    Science.gov (United States)

    Hay, Katrina

    2013-02-01

    Pacific Lutheran University (Tacoma, WA) is renowned for the number of its courses that offer international and study-away opportunities. Inspired by the theme of sustainability, and my growing concern about the environmental impact of conventional fuels, I offered a course, Physics of Energy, for the first time during PLU's January 2011 term (a one-month semester). The two-week travel portion of the course took students on the Amtrak Coast Starlight train route from Tacoma, WA, to Los Angeles to study various forms of energy production. Students studied physics topics in the classroom, through hands-on activities, by traveling to energy research and production facilities, and while working on their interdisciplinary term projects. The course, which utilized local talent and focused on sustainability, provided a positive physics learning experience for majors and non-majors alike.

  19. Hanford technology integration: A success story

    International Nuclear Information System (INIS)

    Stenehjem, E.J.; Pond, D.J.; Widrig, J.E.; Deonigi, D.E.

    1994-01-01

    This paper describes recent activities of the Richland Northwest Laboratory in the area of technology transfer. A major thrust within major DOE laboratories has been the implementation of technology transfer activities which transfer scientific knowledge, transfer technologies developed to deal with the production or conservation of energy, and transfer spinoff technologies into the private sector. Several activities which are in process or have been implemented are described in this paper

  20. Decontamination and inspection plan for Phase 3 closure of the 300 area waste acid treatment system

    International Nuclear Information System (INIS)

    LUKE, S.N.

    1999-01-01

    This decontamination and inspection plan (DIP) describes decontamination and verification activities in support of Phase 3 closure of the 300 Area Waste Acid Treatment System (WATS). Phase 3 is the third phase of three WATS closure phases. Phase 3 attains clean closure conditions for WATS portions of the 334 and 311 Tank Farms (TF) and the 333 and 303-F Buildings. This DIP also describes designation and management of waste and debris generated during Phase 3 closure activities. Information regarding Phase 1 and Phase 2 for decontamination and verification activities closure can be found in WHC-SD-ENV-AP-001 and HNF-1784, respectively. This DIP is provided as a supplement to the closure plan (DOE/RL-90-11). This DIP provides the documentation for Ecology concurrence with Phase 3 closure methods and activities. This DIP is intended to provide greater detail than is contained in the closure plan to satisfy Ecology Dangerous Waste Regulations, Washington Administrative Code (WAC) 173-303-610 requirement that closure documents describe the methods for removing, transporting, storing, and disposing of all dangerous waste at the unit. The decontamination and verification activities described in this DIP are based on the closure plan and on agreements reached between Ecology and the U.S. Department of Energy, Richland Operations Office (DOE-RL) during Phase 3 closure activity workshops and/or project manager meetings (PMMs)

  1. 75 FR 82200 - Expansion of Global Entry Pilot to Mexican Nationals

    Science.gov (United States)

    2010-12-29

    ... Francisco, California (SFO); Orlando International Airport, Orlando, Florida (MCO); Detroit Metropolitan...-Orlando International Airport, Sanford, Florida (SSB); Seattle-Tacoma International Airport-SEATAC... Entry phase expected to offer expedited travel into the United States for Mexican nationals who meet CBP...

  2. H.R. 5477: A Bill to provide the States that are not members of interstate compacts for the disposal of low-level radioactive waste may not site low-level radioactive waste disposal facilities within 60 miles of an international border, and for other purposes. Introduced in the House of Representatives, One Hundredth First Congress, Second Session, August 3, 1990

    International Nuclear Information System (INIS)

    Anon.

    1990-01-01

    Also applicable to all states, whether interstate compact members or not, are the following restrictions on the siting of low-level radioactive waste disposal facilities. Such facilities may not be sited: within 25 miles of the critical habitat of a species listed as endangered or threatened; within 10 miles of an area determined to be a wetland; or within 10 miles of an area of archaeological importance. The act exempts the three facilities in current operation, namely, those located at Barnwell, North Carolina; Richland, Washington; and Beatty, Nevada

  3. 78 FR 34552 - Modification of Class D and Class E Airspace and Establishment of Class E Airspace; Pasco, WA

    Science.gov (United States)

    2013-06-10

    ... Compass Locator at ILS Outer Marker (LOM) has been decommissioned and needs to be removed from Class E... within 3.5 miles each side of the Tri-Cities Airport 045[deg] bearing extending from the 4.3-mile radius...] bearing of Richland Airport extending 20.9 miles northeast of Richland Airport; that airspace extending...

  4. 78 FR 77548 - Noise Exposure Map Notice; Receipt of Noise Compatibility Program and Request for Review Seattle...

    Science.gov (United States)

    2013-12-23

    ... DEPARTMENT OF TRANSPORTATION Federal Aviation Administration Noise Exposure Map Notice; Receipt of Noise Compatibility Program and Request for Review Seattle-Tacoma International Airport Seattle...) announces its determination that the Noise Exposure Maps submitted by the Port of Seattle for the Seattle...

  5. Banned Books: A Study of Censorship.

    Science.gov (United States)

    Rossuck, Jennifer

    1997-01-01

    Describes how a course on censorship taught at an all-girls high school in Tacoma, Washington, drew on current event controversies to initiate discussion. Outlines the course's four units and uses Ray Bradbury's "Fahrenheit 451" to frame course questions. (TB)

  6. RIVER CORRIDOR BUILDINGS 324 and 327 CLEANUP

    International Nuclear Information System (INIS)

    BAZZELL, K.D.; SMITH, B.A.

    2006-01-01

    A major challenge in the recently awarded River Corridor Closure (RCC) Contract at the U.S. Department of Energy's (DOE) Hanford Site is decontaminating and demolishing (D and D) facilities in the 300 Area. Located along the banks of the Columbia River about one mile north of Richland, Washington, the 2.5 km 2 (1 mi 2 )300 Area comprises only a small part of the 1517 km 2 (586 mi 2 ) Hanford Site. However, with more than 300 facilities ranging from clean to highly contaminated, D and D of those facilities represents a major challenge for Washington Closure Hanford (WCH), which manages the new RCC Project for DOE's Richland Operations Office (RL). A complicating factor for this work is the continued use of nearly a dozen facilities by the DOE's Pacific Northwest National Laboratory (PNNL). Most of the buildings will not be released to WCH until at least 2009--four years into the seven-year, $1.9 billion RCC Contract. The challenge will be to deactivate, decommission, decontaminate and demolish (D4) highly contaminated buildings, such as 324 and 327, without interrupting PNNL's operations in adjacent facilities. This paper focuses on the challenges associated with the D4 of the 324 Building and the 327 Building

  7. Hanford Site Environmental Surveillance Master Sampling Schedule

    International Nuclear Information System (INIS)

    Bisping, L.E.

    2000-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest National Laboratory (PNNL) for the U.S. Department of Energy (DOE). Sampling is conducted to evaluate levels of radioactive and nonradioactive pollutants in the Hanford environs, as required in DOE Order 5400.1, General Environmental Protection Program: and DOE Order 5400.5, Radiation Protection of the Public and the Environment. The sampling design is described in the Operations Office, Environmental Monitoring Plan, United States Department of Energy, Richland DOE/RL-91-50, Rev.2, U.S. Department of Energy, Richland, Washington. This document contains the CY 2000 schedules for the routine collection of samples for the Surface Environmental Surveillance Project (SESP) and Drinking Water Monitoring Project. Each section includes sampling locations, sample types, and analyses to be performed. In some cases, samples are scheduled on a rotating basis and may not be collected in 2000 in which case the anticipated year for collection is provided. In addition, a map showing approximate sampling locations is included for each media scheduled for collection

  8. Columbia River pathway report: phase I of the Hanford Environmental Dose Reconstruction Project

    Energy Technology Data Exchange (ETDEWEB)

    1991-07-01

    This report summarizes the river-pathway portion of the first phase of the Hanford Environmental Dose Reconstruction (HEDR) Project. The HEDR Project is estimating radiation doses that could have been received by the public from the Department of Energy's Hanford Site, in southeastern Washington State. Phase 1 of the river-pathway dose reconstruction effort sought to determine whether dose estimates could be calculated for populations in the area from above the Hanford Site at Priest Rapids Dam to below the site at McNary Dam from January 1964 to December 1966. Of the potential sources of radionuclides from the river, fish consumption was the most important. Doses from drinking water were lower at Pasco than at Richland and lower at Kennewick than at Pasco. The median values of preliminary dose estimates calculated by HEDR are similar to independent, previously published estimates of average doses to Richland residents. Later phases of the HEDR Project will address dose estimates for periods other than 1964--1966 and for populations downstream of McNary Dam. 17 refs., 19 figs., 1 tab.

  9. Columbia River pathway report

    International Nuclear Information System (INIS)

    1991-07-01

    This report summarizes the river-pathway portion of the first phase of the Hanford Environmental Dose Reconstruction (HEDR) Project. The HEDR Project is estimating radiation doses that could have been received by the public from the Department of Energy's Hanford Site, in southeastern Washington State. Phase 1 of the river-pathway dose reconstruction effort sought to determine whether dose estimates could be calculated for populations in the area from above the Hanford Site at Priest Rapids Dam to below the site at McNary Dam from January 1964 to December 1966. Of the potential sources of radionuclides from the river, fish consumption was the most important. Doses from drinking water were lower at Pasco than at Richland and lower at Kennewick than at Pasco. The median values of preliminary dose estimates calculated by HEDR are similar to independent, previously published estimates of average doses to Richland residents. Later phases of the HEDR Project will address dose estimates for periods other than 1964--1966 and for populations downstream of McNary Dam. 17 refs., 19 figs., 1 tab

  10. Hanford Site Environmental Surveillance Master Sampling Schedule

    International Nuclear Information System (INIS)

    Bisping, L.E.

    1999-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest National Laboratory (PNNL) for the U.S. Department of Energy (DOE). Sampling is conducted to evaluate levels of radioactive and nonradioactive pollutants in the Hanford environs, as required in DOE Order 5400.1, ''General Environmental protection Program,'' and DOE Order 5400.5, ''Radiation Protection of the Public and the Environment.'' The sampling methods are described in the Environmental Monitoring Plan, United States Department of Energy, Richland Operations Office, DOE/RL-91-50, Rev.2, U.S. Department of Energy, Richland, Washington. This document contains the CY1999 schedules for the routine collection of samples for the Surface Environmental Surveillance Project (SESP) and Drinking Water Monitoring Project. Each section includes the sampling location, sample type, and analyses to be performed on the sample. In some cases, samples are scheduled on a rotating basis and may not be collected in 1999 in which case the anticipated year for collection is provided. In addition, a map is included for each media showing approximate sampling locations

  11. TERRAIN, RICHLAND PARISH, LA, USA

    Data.gov (United States)

    Federal Emergency Management Agency, Department of Homeland Security — Terrain data, as defined in FEMA Guidelines and Specifications, Appendix N: Data Capture Standards, describes the digital topographic data that was used to create...

  12. Applied ALARA Workshops Richland, Washington

    International Nuclear Information System (INIS)

    DECKER, W.A.

    1999-01-01

    The purpose of this standard is to provide Project Hanford Management Contractors (PHMC) with guidance for ensuring radiological considerations are adequately addressed throughout the work planning process. Incorporating radiological controls in the planning process is a requirement of the Hanford Site Radiological Control Manual (HSRCM-I), Chapter 3, Part 1. This standard is applicable to all PHMC contractors and subcontractors. The essential elements of this standard will be incorporated into the appropriate site level work control standard upon implementation of the anticipated revision of the PHMC Administration and Procedure System

  13. HYDROLOGY, Richland County, ND, USA

    Data.gov (United States)

    Federal Emergency Management Agency, Department of Homeland Security — Hydrology data include spatial datasets and data tables necessary for documenting the hydrologic procedures for estimating flood discharges for a flood insurance...

  14. HYDRAULICS, RICHLAND COUNTY, ND, USA

    Data.gov (United States)

    Federal Emergency Management Agency, Department of Homeland Security — Recent developments in digital terrain and geospatial database management technology make it possible to protect this investment for existing and future projects to...

  15. Environmental restoration contractor facility safety plan -- MO-561 100-D site remediation project

    International Nuclear Information System (INIS)

    Donahoe, R.L.

    1996-11-01

    This safety plan is applicable to Environmental Restoration Contractor personnel who are permanently assigned to MO-561 or regularly work in the facility. The MO-561 Facility is located in the 100-D Area at the Hanford Site in Richland, Washington. This plan will: (a) identify hazards potentially to be encountered by occupants of MO-561; (b) provide requirements and safeguards to ensure personnel safety and regulatory compliance; (c) provide information and actions necessary for proper emergency response

  16. Pacific Northwest National Laboratory Annual Site Environmental Report for Calendar Year 2013

    Energy Technology Data Exchange (ETDEWEB)

    Duncan, Joanne P. [Pacific Northwest National Laboratory (PNNL), Richland, WA (United States); Sackschewsky, Michael R. [Pacific Northwest National Laboratory (PNNL), Richland, WA (United States); Tilden, Harold T. [Pacific Northwest National Laboratory (PNNL), Richland, WA (United States); Barnett, J. Matthew [Pacific Northwest National Laboratory (PNNL), Richland, WA (United States); Su-Coker, Jennifer [Pacific Northwest National Laboratory (PNNL), Richland, WA (United States); Ballinger, Marcel Y. [Pacific Northwest National Laboratory (PNNL), Richland, WA (United States); Fritz, Brad G. [Pacific Northwest National Laboratory (PNNL), Richland, WA (United States); Stoetzel, Gregory A. [Pacific Northwest National Laboratory (PNNL), Richland, WA (United States); Lowry, Kami L. [Pacific Northwest National Laboratory (PNNL), Richland, WA (United States); Moon, Thomas W. [Pacific Northwest National Laboratory (PNNL), Richland, WA (United States); Becker, James M. [Pacific Northwest National Laboratory (PNNL), Richland, WA (United States); Mendez, Keith M. [Pacific Northwest National Laboratory (PNNL), Richland, WA (United States); Raney, Elizabeth A. [Pacific Northwest National Laboratory (PNNL), Richland, WA (United States); Chamness, Michele A. [Pacific Northwest National Laboratory (PNNL), Richland, WA (United States); Larson, Kyle B. [Pacific Northwest National Laboratory (PNNL), Richland, WA (United States)

    2014-09-30

    Pacific Northwest National Laboratory (PNNL), one of the U.S. Department of Energy (DOE) Office of Science’s 10 national laboratories, provides innovative science and technology development in the areas of energy and the environment, fundamental and computational science, and national security. DOE’s Pacific Northwest Site Office (PNSO) is responsible for oversight of PNNL at its Campus in Richland, Washington, as well as its facilities in Sequim, Seattle, and North Bonneville, Washington, and Corvallis and Portland, Oregon.

  17. 77 FR 49857 - Early Scoping Notification for the Alternatives Analysis of the Tacoma Link Expansion in Tacoma, WA

    Science.gov (United States)

    2012-08-17

    ... and Regional Express bus service, as well as Pierce Transit and Intercity Transit), the University of... reduce the number of vehicle miles traveled as commute trips. The need to serve increasing commute trips... typically include disciplines such as travel forecasting, capital and operations and maintenance costs, and...

  18. How to avoid a 'Tacoma bridge' accident?; Comment eviter l'accident du pont de Tacoma?

    Energy Technology Data Exchange (ETDEWEB)

    Granger, S

    1999-07-01

    At the heart of a nuclear power station is the steam generator, subject to high pressures and temperatures, as well as enormous water circulation through the thousands of tubes which transfer heat between the primary and secondary circuits. The interaction between the flow of the fluid and the structural vibrations are the subject of a damage-prevention study. (author)

  19. 76 FR 48179 - Notice of Inventory Completion: Slater Museum of Natural History, University of Puget Sound...

    Science.gov (United States)

    2011-08-08

    ... Museum of Natural History, University of Puget Sound, Tacoma, WA AGENCY: National Park Service, Interior. ACTION: Notice. SUMMARY: The Slater Museum of Natural History, University of Puget Sound has completed an... contact the Slater Museum of Natural History, University of Puget Sound. Disposition of the human remain...

  20. Object-Oriented Software Model for Battlefield Signal Transmission and Sensing

    Science.gov (United States)

    2009-12-01

    The contents of this report are not to be used for advertising , publication, or promotional purposes. Citation of trade names does not constitute an...characteristics. For example, instances of wheeled ground vehicles could be a specific type of HMMWV or a Toyota Tacoma pick-up truck. The signature

  1. 77 FR 27010 - Endangered and Threatened Wildlife and Plants; Revised Critical Habitat for the Northern Spotted Owl

    Science.gov (United States)

    2012-05-08

    ... Convention Center, 777 NE Martin Luther King Blvd., Portland, Oregon; 503-235-7575. Public Meetings: Public information meetings will be held at: University of Washington, Tacoma Campus, 1900 Commerce St., Jane Russell..., California 96001; 530-229-0036; Oregon Convention Center, Room C-120, 777 NE Martin Luther King Blvd...

  2. Annual Status Report (FY2009) Composite Analysis of Low-Level Waste Disposal in the Central Plateau at the Hanford Site

    Energy Technology Data Exchange (ETDEWEB)

    Nichols, W. E. [CH2M HILL Plateau Remediation Company, Richland, WA (United States)

    2010-02-10

    In accordance with the U.S. Department of Energy (DOE) requirements in DOE O 435.1, Radioactive Waste Management, and implemented by DOE/RL-2000-29, Maintenance Plan for the Composite Analysis of the Hanford Site, Southeast Washington, the DOE Richland Operations Office has prepared this annual status report for fiscal year (FY) 2009 of PNNL-11800, Composite Analysis for the Low-Level Waste Disposal in the 200-Area Plateau of the Hanford Site, hereafter referred to as the Composite Analysis.

  3. BRET fuel assembly dismantling machine

    International Nuclear Information System (INIS)

    Titzler, P.A.; Bennett, K.L.; Kelley, R.S. Jr.; Stringer, J.L.

    1984-08-01

    An automated remote nuclear fuel assembly milling and dismantling machine has been designed, developed, and demonstrated at the Hanford Engineering Development Laboratory (HEDL) in Richland, Washington. The machine can be used to dismantle irradiated breeder fuel assemblies from the Fast Flux Test Facility prior to fuel reprocessing. It can be installed in an existing remotely operated shielded hot cell facility, the Fuels and Materials Examination Facility (FMEF), at the Hanford Site in Richland, Washington

  4. High Performance Fuel Laboratory, Hanford Reservation, Richland, Washington. Final environmental impact statement

    International Nuclear Information System (INIS)

    1977-09-01

    The High Performance Fuel Laboratory (HPFL) will provide pilot scale tests of manufacturing processes, equipment, and handling systems and of accountability and safeguards, methods, and equipment while keeping radiological and chemical exposures of the workers, public, and environment at the lowest practicable levels. The experience gained from designing, constructing and operating the HPFL can be used in future commitments to commercial fuel fabrication plants in the late 1980s and beyond for processing of nuclear fuel. The HPFL site is located in the 400 Area of the 559-square mile, federally owned Hanford Reservation. This environmental impact statement considers effects of the HPFL under normal conditions and in the event of an accident

  5. 77 FR 9528 - Security Zone; Protection of Military Cargo, Captain of the Port Zone Puget Sound

    Science.gov (United States)

    2012-02-17

    ... DEPARTMENT OF HOMELAND SECURITY Coast Guard 33 CFR Part 165 [Docket No. USCG-2012-0087] Security Zone; Protection of Military Cargo, Captain of the Port Zone Puget Sound AGENCY: Coast Guard, DHS... Waterway Security Zone in Commencement Bay, Tacoma, Washington from 6 a.m. on February 17, 2012, through 11...

  6. Diagnosis of Compartment Syndrome Based on Tissue Oxygenation

    Science.gov (United States)

    2015-06-01

    Phenylephrine is also commonly used to treat hypotension during obstetric procedures and maintain blood pressure in traumatic brain injuries 27, 28...United States bOrthopedic Surgery Service, Madigan Army Medical Center, Tacoma, WA, United States A R T I C L E I N F O Article history : Accepted 10

  7. How to avoid a 'Tacoma bridge' accident?

    International Nuclear Information System (INIS)

    Granger, S.

    1999-01-01

    At the heart of a nuclear power station is the steam generator, subject to high pressures and temperatures, as well as enormous water circulation through the thousands of tubes which transfer heat between the primary and secondary circuits. The interaction between the flow of the fluid and the structural vibrations are the subject of a damage-prevention study. (author)

  8. Hospital de San José en Tacoma, Washington- (EE.UU.

    Directory of Open Access Journals (Sweden)

    Goldberg, Bertrand

    1977-02-01

    Full Text Available The building is formed by two structural masses which greatly contrast with the buildings surrounding same. A nine-story tower, rest on a two-story rectangular base, with a central core going through the entire height of the building. The building is finished off with an attic for installations. The following services are installed in the base: reception, emergency, operating rooms, recuperation, radiology, pharmacy and other complementary and functional departments. The two central core floors, in the base of the tower, house the machinery for running the building. The nine floors of the tower are destined to: one for pediatrics, another for medical specialties, a third for gynecology and birth recovery; four for medical and surgery patients and two for enlargement. The floors destined for patients rooms consists of four symmetrical square-shaped sections, made of resistant walls in which concavities and convexities alternate throughout the height of the building. Each area consists of eight to nine rooms, layed-out in a semicircle around a nurse's station, permitting direct visual attention of the patients without the nurses having to get up. In addition, this group uses the general services of the central core and the stairs and elevators which surround it. The interior design of the building is sober and functional, complemented by a number of installations which contribute to its comfort and good operation.El edificio está formado por dos volúmenes estructurales de carácter marcadamente en contraste con las construcciones que le rodean. Sobre una base rectangular de dos plantas se eleva la torre, de nueve plantas, apoyada en columnas perimetrales y en un núcleo central que la recorre en toda su altura. La construcción se remata con un ático para instalaciones. En la base se distribuyen: recepción, emergencia, quirófanos, recuperación, radiología, farmacia y otros departamentos de funciones complementarias para el hospital

  9. A two-state citizen task force responds to Dept. of Energy on defense waste

    International Nuclear Information System (INIS)

    Peelle, E.

    1990-01-01

    Successes in public involvement efforts for nuclear waste management are so few that they deserve careful documentation and analysis. This paper chronicles the goals, process, problems and outcomes of one such success, the Northwest Defense Waste Citizens Forum (CF), created by the DOE-Richland manager in 1986 to advise DOE on its plans for nuclear waste disposal and cleanup of the Hanford site in eastern Washington state. DOE under-took an extensive multi-facted public involvement program to gain advice, understanding and support on heretofore neglected defense waste (DW) cleanup problems. DOE sought broad public input for a draft environmental impact statement (DEIS) at an early stage before all characterization data were complete and before a recommended alternative was formulated. In the evolving, often-controversial, highly-visible area of agency-public interactions, citizen task forces (TFs) have been shown to be useful in developing public policy at the local level. For DOE-Richland, the high-risk gamble in undertaking a public involvement program involving reversals of long-term DOE policies of secrecy and unresponsiveness to its host area paid off handsomely in an improved EIS, better relationships with state agencies and regional businesses, and unexpected political support for DW cleanup funding. The Hanford citizen forum was highly successful in both DOE's and participant views, with significant achievements, unusual process and technical findings of its own. By the authors' criteria discussed earlier for public participation efforts, the CF effort was successful in all 3 areas. The success of this approach suggests its use as a model for other federal cleanup activities

  10. Remedial investigation/feasibility study work plan for the 100-KR-4 operable unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1992-09-01

    Four areas of the Hanford Site (the 100, 200, 300, and 1100 Areas) have been included on the US Environmental Protection Agency's (EPA's) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). This work plan and the attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the CERCLA remedial investigation/feasibility study (RI/FS) for the 100-KR-4 operable unit. The 100-K Area consists of the 100-KR-4 groundwater operable unit and three source operable units. The 100-KR-4 operable unit includes all contamination found in the aquifer soils and water beneath the 100-K Area. Source operable units include facilities and unplanned release sites that are potential sources of contamination

  11. Remedial investigation/feasibility study work plan for the 100-KR-4 operable unit, Hanford Site, Richland, Washington

    Energy Technology Data Exchange (ETDEWEB)

    1992-09-01

    Four areas of the Hanford Site (the 100, 200, 300, and 1100 Areas) have been included on the US Environmental Protection Agency`s (EPA`s) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). This work plan and the attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the CERCLA remedial investigation/feasibility study (RI/FS) for the 100-KR-4 operable unit. The 100-K Area consists of the 100-KR-4 groundwater operable unit and three source operable units. The 100-KR-4 operable unit includes all contamination found in the aquifer soils and water beneath the 100-K Area. Source operable units include facilities and unplanned release sites that are potential sources of contamination.

  12. Expert Panel Recommendations for Hanford Double-Shell Tank Life Extension

    Energy Technology Data Exchange (ETDEWEB)

    Stewart, Charles W; Bush, Spencer H; Berman, Herbert Stanton; Czajkowski, Carl J; Divine, James R; Posakony, Gerald J; Johnson, A B; Elmore, Monte R; Reynolds, D A; Anantatmula, Ramamohan P; Sindelar, Robert L; Zapp, Philip E

    2001-06-29

    Expert workshops were held in Richland in May 2001 to review the Hanford Double-Shell Tank Integrity Project and make recommendations to extend the life of Hanford's double-shell waste tanks. The workshop scope was limited to corrosion of the primary tank liner, and the main areas for review were waste chemistry control, tank inspection, and corrosion monitoring. Participants were corrosion experts from Hanford, Savannah River Site, Brookhaven National Lab., Pacific Northwest National Lab., and several consultants. This report describes the current state of the three areas of the program, the final recommendations of the workshop, and the rationale for their selection.

  13. 78 FR 54588 - Security Zone; Protection of Military Cargo, Captain of the Port Zone Puget Sound

    Science.gov (United States)

    2013-09-05

    ... DEPARTMENT OF HOMELAND SECURITY Coast Guard 33 CFR Part 165 [Docket No. USCG-2012-0087] Security Zone; Protection of Military Cargo, Captain of the Port Zone Puget Sound AGENCY: Coast Guard, DHS... Security Zone in Commencement Bay, Tacoma, Washington from 6:00 a.m. on September 2, 2013 through 11:59 p.m...

  14. 78 FR 57485 - Security Zone; Protection of Military Cargo, Captain of the Port Zone Puget Sound

    Science.gov (United States)

    2013-09-19

    ... DEPARTMENT OF HOMELAND SECURITY Coast Guard 33 CFR Part 165 [Docket No. USCG-2012-0087] Security Zone; Protection of Military Cargo, Captain of the Port Zone Puget Sound AGENCY: Coast Guard, DHS... Security Zone in Commencement Bay, Tacoma, Washington from 6 a.m. on September 12, 2013 through 11:59 p.m...

  15. 78 FR 7265 - Security Zone; Protection of Military Cargo, Captain of the Port Zone Puget Sound, WA

    Science.gov (United States)

    2013-02-01

    ... DEPARTMENT OF HOMELAND SECURITY Coast Guard 33 CFR Part 165 [Docket No. USCG-2012-0087] Security Zone; Protection of Military Cargo, Captain of the Port Zone Puget Sound, WA AGENCY: Coast Guard, DHS... Security Zone in Commencement Bay, Tacoma, Washington from 6 a.m. on February 1, 2013, through 11:59 p.m...

  16. 78 FR 11981 - Security Zone; Protection of Military Cargo, Captain of the Port Zone Puget Sound, WA

    Science.gov (United States)

    2013-02-21

    ... DEPARTMENT OF HOMELAND SECURITY Coast Guard 33 CFR Part 165 [Docket No. USCG-2012-0087] Security Zone; Protection of Military Cargo, Captain of the Port Zone Puget Sound, WA AGENCY: Coast Guard, DHS... Security Zone in Commencement Bay, Tacoma, Washington from 6 a.m. on February 23, 2013, through 11:59 p.m...

  17. Draft Hanford Remedial Action Environmental Impact Statement and Comprehensive Land Use Plan: Volume 2 of 4

    International Nuclear Information System (INIS)

    1996-08-01

    This appendix discusses the scope of actions addressed in the Draft Hanford Remedial Action Environmental Impact Statement and Comprehensive Land Use Plan. To address the purpose and need for agency action identified in Chapter 2.0 of the HRA-EIS, the scope includes an evaluation of the potential environmental impacts associated with the remedial actions to be conducted by the US Department of Energy (DOE) under the provisions of the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) (Ecology et al. 1989). These remedial actions would bring the Hanford Site into compliance with the applicable requirements of the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) and the Resource Conservation and Recovery Act of 1976 (RCRA). The DOE program responsible for conducting remedial actions at the Hanford Site is referred to as the Richland Environmental Restoration (ER) Project. The Richland ER Project encompasses the following projects: radiation area remedial actions and underground storage tanks (UST); RCRA closures; single-shell tank (SST) closures; past-practice waste site operable unit (source and groundwater) remedial actions; surplus facility decommissioning; and waste storage and disposal facilities

  18. Surplus Facilities and Resource Conservation and Recovery Act Closure program plan, fiscal year 1992

    International Nuclear Information System (INIS)

    Hughes, M.C.; Wahlen, R.K.; Winship, R.A.

    1991-10-01

    The Surplus Facilities and Resource Conservation and Recovery Act Closure program is responsible to US Department of Energy Field Office, Richland for the safe, cost-effective surveillance, maintenance, and decommissioning of surplus facilities at the Hanford Site. The Surplus Facilities and Resource Conservation and Recovery Act Closure program is also responsible to US Department of Energy Field Office, Richland for the program management of specific Resource Conservation and Recovery Act closures at the Hanford Site. This program plan addresses only the surplus facilities. The criteria used to evaluate each factor relative to decommissioning are based on the guidelines presented by the US Department of Energy Field Office, Richland, Environmental Restoration Division. The guidelines are consistent with the Westinghouse Hanford Company commitment to decommission Hanford Site retired facilities in the safest and most cost-effective way achievable. This document outlines the plan for managing these facilities until disposal

  19. Passive neutron survey of the 233-S Plutonium Concentration Facility

    International Nuclear Information System (INIS)

    1996-08-01

    A passive neutron survey was performed at the 233-S Plutonium Concentration Facility (located at the Hanford Site in Richland, Washington) during late 1994 and early 1995. Four areas were surveyed: an abandoned filter box and pipe trench, column laydown trench, load-out hood, and process hood. The primary purpose of the survey was to identify locations that had plutonium to help direct decontamination and decommissioning activities. A secondary purpose of the survey was to determine the quantity of material when its presence was identified

  20. DOE Office of Environmental Management, 2016 Year in Review

    Energy Technology Data Exchange (ETDEWEB)

    None

    2016-12-01

    2016 accomplishments and primary areas of focus for the Department of Energy's (DOE's) Office of Environmental Management and EM sites are presented. For DOE EM, these include Focusing on the Field, Teaming with Cleanup Partners, Developing New Technology, and Maximizing Cleanup Dollars. Major 2016 achievements are highlighted for EM, Richland Operations Office, Office of River Protection, Savannah River Site, Oak Ridge, Idaho, Waste Isolation Pilot Plant, Los Alamos, Portsmouth, Paducah, West Valley Demonstration Project, and the Nevada National Security Site,

  1. Regional Disease Surveillance Meeting - Final Paper

    Energy Technology Data Exchange (ETDEWEB)

    Lesperance, Ann M.; Mahy, Heidi A.

    2006-08-08

    On June 1, 2006, public health officials working in surveillance, epidemiological modeling, and information technology communities from the Seattle/Tacoma area and State of Washington met with members of the Pacific Northwest National Laboratory (PNNL) to discuss the current state of disease surveillance and gaps and needs to improve the current systems. The meeting also included a discussion of PNNL initiatives that might be appropriate to enhance disease surveillance and the current tools being used for disease surveillance. Participants broke out into two groups to identify critical gaps and needs for improving a surveillance system, and discuss the requirements for developing improved surveillance. Each group developed a list of key priorities summarizing the requirements for improved surveillance. The objective of this meeting was to work towards the development of an improved disease surveillance system.

  2. Drought in the Emerald City

    International Nuclear Information System (INIS)

    Babcock, S.D.

    1993-01-01

    This paper discusses a drought preparedness study being conducted for the Cedar River and Green River basins in western Washington state. The study is one of four regional case studies being managed by the U.S. Army Corps of Engineers as part of the National Study of Water Management During Drought. The overriding objective of the drought preparedness study is to leave the region better prepared for drought, through demonstration and test of drought preparedness tools and strategies. The study has served as a vehicle to promote a greater regional focus on drought related water supply problem solving. The 1992 drought in the Seattle/Tacoma metropolitan area provided a unique opportunity for the study team to demonstrate approaches to drought management being researched and tested as part of the study

  3. Remedial investigation/feasibility study work plan for the 100-BC-5 operable unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1992-07-01

    Four areas of the Hanford Site (the 100, 200, 300, and 1100 Areas) have been included on the US Environmental Protection Agency's (EPA's) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). The Tri-Party Agreement requires that the cleanup programs at the Hanford Site integrate the requirements of CERCLA, RCRA, and Washington State's dangerous waste (the state's RCRA-equivalent) program. This work plan and the attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the CERCLA remedial investigation/feasibility study (RI/FS) for the 100-BC-5 operable unit. The 100-B/C Area consists of the 100-BC-5 groundwater operable unit and four source operable units. The 100-BC-5 operable unit includes all contamination found in the aquifer soils and water beneath the 100-B/C Area. Source operable units include facilities and unplanned release sites that are potential sources of contamination

  4. 76 FR 19781 - Protection Island and San Juan Islands National Wildlife Refuges, Jefferson, San Juan, Skagit...

    Science.gov (United States)

    2011-04-08

    ... would continue as they have in the past and be facilitated through a State Parks partnership..., provided the draft CCP and EA on the Regional Web site, and provided a press release to local media. We... 98286. University of Puget Sound Library 1500 N. Warner St. 253-879-3669 Campus, Mail Box 1021 Tacoma...

  5. New Whole-House Solutions Case Study: Performance and Costs of Ductless Heat Pumps in Marine Climate High-Performance Homes

    Energy Technology Data Exchange (ETDEWEB)

    None

    2016-02-24

    The Woods is a sustainable community built by Habitat for Humanity in 2013. This community comprises 30 homes that are high-performance and energy-efficient. With support from Tacoma Public Utilities and the Bonneville Power Administration, the BA-PIRC team is researching the energy performance of these homes and the ductless heat pumps they employ.

  6. Teaching the Physics of Energy while Traveling by Train

    Science.gov (United States)

    Hay, Katrina

    2013-01-01

    Pacific Lutheran University (Tacoma, WA) is renowned for the number of its courses that offer international and study-away opportunities. Inspired by the theme of sustainability, and my growing concern about the environmental impact of conventional fuels, I offered a course, Physics of Energy, for the first time during PLU's January 2011 term (a…

  7. Tests of the 30-MJ superconducting magnetic-energy storage unit

    International Nuclear Information System (INIS)

    Boenig, H.J.; Dean, J.W.; Rogers, J.D.; Schermer, R.I.; Hauer, J.F.

    1983-01-01

    A 30-MJ (8.4 kWh) superconducting magnetic energy storage (SMES) unit with a 10-MW converter was installed during the later months of 1982 at the Bonneville Power Administration (BPA) Tacoma substation in Tacoma, Washington. The unit, which is capable of absorbing and releasing up to 10 MJ of energy at a frequency of 0.35 Hz, was designed to damp the dominant power swing mode of the Pacific AC Intertie. Extensive tests were performed with the unit during the first half of 1983. This paper will review the major components of the storage unit and describe the startup and steady state operating experience with the coil, dewar, refrigerator and converter. The unit has absorbed power up to a level of 11.8 Mw. Real power was modulated following a sinusoidal power demand with frequencies from 0.1 to 1.2 Hz and a power level up to +- 8.3 MW. The unit has performed in accordance with design expectations and no major problems have developed

  8. Results of Phase I groundwater quality assessment for single-shell tank waste management Area S-SX at the Hanford Site

    International Nuclear Information System (INIS)

    Johnson, V.G.; Chou, C.J.

    1998-01-01

    Pacific Northwest National Laboratory (PNNL) conducted a Phase I, Resource Conservation and Recovery Act of 1976 (RCRA) groundwater quality assessment for the Richland Field Office of the U.S. Department of Energy (DOE-RL), in accordance with the Federal Facility Compliance Agreement. The purpose of the investigation was to determine if the Single-Shell Tank Waste Management Area (WMA) S-SX has impacted groundwater quality. The WMA is located in the southern portion of the 200 West Area of the Hanford Site and consists of the 241-S and 241-SX tank farms and ancillary waste systems. The unit is regulated under RCRA interim-status regulations (40 CFR 265, Subpart F) and was placed in assessment groundwater monitoring (40 CFR 265.93 [d]) in August 1996 because of elevated specific conductance and technetium-99, a non-RCRA co-contaminant, in downgradient monitoring wells. Major findings of the assessment are summarized below: (1) Distribution patterns for radionuclides and RCRA/dangerous waste constituents indicate WMA S-SX has contributed to groundwater contamination observed in downgradient monitoring wells. (2) Drinking water standards for nitrate and technetium-99 are currently exceeded in one RCRA-compliant well (299-W22-46) located at the southeastern comer of the SX tank farm. (3) Technetium-99, nitrate, and chromium concentrations in downgradient well 299-W22-46 (the well with the highest current concentrations) appear to be declining after reaching maximum concentrations in May 1997. (4) Cesium-137 and strontium-90, major constituents of concern in single-shell tank waste, were not detected in any of the RCRA-compliant wells in the WMA network, including the well with the highest current technetium-99 concentrations (299-W22-46). (5) Low but detectable strontium-90 and cesium-137 were found in one old well (2-W23-7), located inside and between the S and SX tank farms

  9. 324 Building fire hazards analysis implementation plan

    International Nuclear Information System (INIS)

    Eggen, C.D.

    1998-01-01

    In March 1998, the 324 Building Fire Hazards Analysis (FHA) (Reference 1) was approved by the US Department of Energy, Richland Operations Office (DOE-RL) for implementation by B and W Hanford Company (BWHC). The purpose of the FHA was to identify gaps in compliance with DOE Order 5480.7A (Reference 2) and Richland Operations Office Implementation Directive (RLID) 5480.7 (Reference 3), especially in regard to loss limitation. The FHA identified compliance gaps in six areas and provided 20 recommendations to bring the 324 Building into compliance with DOE Order 5480.7A. Additionally, one observation was provided. To date, four of the recommendations and the one observation have been completed. Actions identified for seven of the recommendations are currently in progress. Exemption requests will be transmitted to DOE-RL for three of the recommendations. Six of the recommendations are related to future shut down activities of the facility and the corrective actions are not being addressed as part of this plan. The actions for recommendations associated with the safety related part of the 324 Building and operation of the cells and support areas were evaluated using the Unreviewed Safety Question (USQ) process. Major Life Safety Code concerns have been corrected. The status of the recommendations and actions was confirmed during the July 1998 Fire Protection Assessment. BVMC will use this Implementation Plan to bring the 324 Building and its operation into compliance with DOE Order 5480.7A and RLID 5480.7

  10. Remedial investigation/feasibility study work plan for the 100-FR-3 operable unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1992-09-01

    Four areas of the Hanford Site (the 100, 200, 300, and 1100 Areas) have been included on the US Environmental Protection Agency's (EPA's) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). Figure 1-1 shows the location of these areas. Under the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement, Ecology et al. 1990a), signed by the Washington State Department of Ecology (Ecology), EPA, and the US Department of Energy (DOE), more than 1,000 inactive waste disposal and unplanned release sites on the Hanford Site have been grouped into a number of source and groundwater operable units. These operable units contain contamination in the form of hazardous waste, radioactive/hazardous mixed waste, and other CERCLA hazardous substances. This work plan and the attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the CERCLA remedial investigation/feasibility study (RI/FS) for the 100-FR-3 operable unit. The 100-K Area consists of the 100-FR-3 groundwater operable unit and two source operable units. The 100-FR-3 operable unit includes all contamination found in the aquifer soils and water beneath the 100-F Area. Source operable units include facilities and unplanned release sites that are potential sources of contamination. A separate work plan has been initiated for the 100-FR-1 source operable unit (DOE-RL 1992a)

  11. 78 FR 16606 - Standard Instrument Approach Procedures, and Takeoff Minimums and Obstacle Departure Procedures...

    Science.gov (United States)

    2013-03-18

    ... 33, Amdt 1 Willmar, MN, Willmar Muni-John L Rice Field, RNAV (GPS) RWY 31, Amdt 1 Charlotte, NC... Seattle, WA, Seattle-Tacoma Intl, RNAV (RNP) Z RWY 34L, Orig-A Newcastle, WY, Mondell Field, RNAV (GPS) RWY 13, Orig-A Newcastle, WY, Mondell Field, RNAV (GPS) RWY 31, Orig-A Effective 2 May 2013 Dunnellon...

  12. Hanford Site performance report - December 1998

    International Nuclear Information System (INIS)

    EDER, D.M.

    2001-01-01

    The purpose of the Hanford Site Performance Report is to provide the Department of Energy Richland Operations Office's (DOE-RL's) report of Hanford's performance by: U. S. Department of Energy, Richland Operations Office, Project Hanford Management Contract (PHMC) through Fluor Daniel Hanford, Inc. (FDH) and its subcontractors, Environmental Restoration Contract through Bechtel Hanford, Inc. (BHI), and its subcontractors, and Pacific Northwest National Laboratories (PNNL) for Science and Technology support to the Environmental Management (EM) mission. This report is published monthly with the intent of relating work performance and progress in the context of the Success Indicators and Critical Success Factors as outlined in the Hanford Strategic Plan. Currently, the report focuses on the EM mission, and will be expanded in the future to include non-EM activities. Section A of this report is the Executive Summary, encapsulating high-level data in this report into an overall brief. Summary information provided includes Notable Accomplishments, a tabular performance profile with associated analyses, Critical Issues, Key Integration Activities, a look at Significant Trends, and a ''quick list'' of Upcoming Key Events. Section B of this report, the Site Summary section, provides Environmental Management performance data specifically organized to the pertinent Critical Success Factors and Success Indicators. The Site Summary is a compilation of performance data from all of the Mission Areas and the Projects that comprise these Mission Areas; the information is presented in both narrative and graphical formats. The remaining sections provide performance data relative to each individual mission area (e.g., Waste Management, Spent Nuclear Fuels, etc.). The information provided in the Mission Area sections is at a level of greater detail than is presented in either the Executive Summary or the Site Summary sections. At the end of this report, a glossary of terms is provided

  13. Near-infrared spectroscopy. Innovative technology summary report

    International Nuclear Information System (INIS)

    1999-07-01

    A near-infrared (NIR) spectroscopy system with a remote fiber-optic probe was developed and demonstrated to measure the water content of high-level radioactive wastes from the underground storage tanks at the Hanford Site in richland Washington. The technology was developed as a cost-effective and safer alternative to the thermogravimetric analysis (TGA) technique in use as the baseline. This work was supported by the Tanks Focus Area (TFA) within the Department of Energy's (DOE) Office of Science and Technology (OST) in cooperation with the Hanford Tank Waste Remediation System (TWRS) Program

  14. Remedial action and waste disposal project: 100-B/C remedial action readiness report

    International Nuclear Information System (INIS)

    April, J.G.; Bryant, D.L.; Cislo, G.B.

    1996-07-01

    This Readiness Evaluation Report presents the results of the project readiness evaluation to assess the readiness of the 100-B/C source sites remediation. The 100-B/C Area is located at the Hanford Site in Richland, Washington. The evaluation was conducted at the conclusion of a series of readiness activities that began in May 1996. These activities included confirming the completion of project specific procedures, training of staff, obtaining support equipment, receipt of subcontractor submittals, approval of subcontractor submittals, and mobilization and construction of site support systems

  15. Annual Status Report (FY2010) Composite Analysis of Low-Level Waste Disposal in the Central Plateau at the Hanford Site

    Energy Technology Data Exchange (ETDEWEB)

    Nichols, W. E. [CH2M HILL Plateau Remediation Company, Richland, WA (United States)

    2011-01-11

    In accordance with the U.S. Department of Energy (DOE) requirements in DOE O 435.1 Chg 1, Radioactive Waste Management, and implemented by DOE/RL-2000-29, Maintenance Plan for the Composite Analysis of the Hanford Site, Southeast Washington, the DOE Richland Operations Office (DOE-RL), also known as RL, has prepared this annual status report for fiscal year (FY) 2010 of PNNL-11800, Composite Analysis for Low-Level Waste Disposal in the 200 Area Plateau of the Hanford Site, hereafter referred to as the Composite Analysis.

  16. View graph presentations of the sixth DOE industry/university/lab forum on robotics for environmental restoration and waste management

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-10-01

    The mission of the Robotics Technology Development Program involves the following: develop robotic systems where justified by safety, cost, and/or efficiency arguments; integrate the best talent from National Labs, industry, and universities in focused teams addressing complex-wide problems; and involve customers in the identification and development of needs driven technologies. This presentation focuses on five areas. They are: radioactive tank waste remediation (Richland); mixed waste characterization, treatment, and disposal (Idaho Falls); decontamination and decommissioning (Morgantown); landfill stabilization (Savannah River); and contaminant plumes containment and remediation (Savannah River).

  17. View graph presentations of the sixth DOE industry/university/lab forum on robotics for environmental restoration and waste management

    International Nuclear Information System (INIS)

    1995-10-01

    The mission of the Robotics Technology Development Program involves the following: develop robotic systems where justified by safety, cost, and/or efficiency arguments; integrate the best talent from National Labs, industry, and universities in focused teams addressing complex-wide problems; and involve customers in the identification and development of needs driven technologies. This presentation focuses on five areas. They are: radioactive tank waste remediation (Richland); mixed waste characterization, treatment, and disposal (Idaho Falls); decontamination and decommissioning (Morgantown); landfill stabilization (Savannah River); and contaminant plumes containment and remediation (Savannah River)

  18. Remedial investigation/feasibility study work plan for the 100-BC-5 Operable Unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1992-04-01

    Four areas of the Hanford Site (the 100, 200, 300 and 1100 Areas) have been included on the US Environmental Protection Agency's (EPA's) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). Figure 1-1 shows the location of these areas. Under the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement, Ecology et al. 1990a), signed by the Washington State Department of Ecology (Ecology), EPA, and the US Department of Energy (DOE), more than 1,000 inactive waste disposal and unplanned release sites on the Hanford Site have been grouped into a number of source and groundwater operable units. These operable units contain contamination in the form of hazardous waste, radioactive/hazardous mixed waste and other CERCLA hazardous substances. Also included in the Tri-Party Agreement are 55 Resource Conservation and Recovery Act (RCRA) treatment, storage, or disposal (TSD) facilities that will be closed or permitted to operate in accordance with RCRA regulations, under the authority of Chapter 173-303 Washington Administrative Code (WAC). Some of the TSD facilities are included in the operable units. This work plant and the attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the CERCLA remedial investigation/feasibility study (RI/FS) for the 100-BC-5 operable unit. The 100-B/C Area consists of the 100-BC-5 groundwater operable unit and four source operable units. The 100-BC-5 operable unit includes all contamination found in the aquifer soils and water beneath the 100-B/C Area. Source operable units include facilities and unplanned release sites that are potential sources of contamination

  19. Remedial investigation/feasibility study work plan for the 100-BC-2 operable unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1993-05-01

    This work plan and attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) remedial investigation/feasibility study (RI/FS) for the 100-BC-2 operable unit in the 100 Area of the Hanford Site. The 100 Area is one of four areas at the Hanford Site that are on the US Environmental Protection Agency's (EPA) National Priorities List under CERCLA. The 100-BC-2 operable unit is one of two source operable units in the 100-B/C Area (Figure ES-1). Source operable units are those that contain facilities and unplanned release sites that are potential sources of hazardous substance contamination. The 100-BC-2 source operable unit contains waste sites that were formerly in the 100-BC-2, 100-BC-3, and 100-BC-4 operable units. Because of their size and geographic location, the waste sites from these two operable units were added to 100-BC-2. This allows for a more efficient and effective investigation of the remaining 100-B/C Reactor area waste sites. The investigative approach to waste sites associated with the 100-BC-2 operable unit are listed in Table ES-1. The waste sites fall into three general categories: high priority liquid waste disposal sites, low priority liquid waste disposal sites, and solid waste burial grounds. Several sites have been identified as candidates for conducting an IRM. Two sites have been identified as warranting additional limited field sampling. The two sites are the 116-C-2A pluto crib, and the 116-C-2C sand filter

  20. Bibliography of the geology of the Columbia Basin and surrounding areas of Washington

    International Nuclear Information System (INIS)

    Tucker, G.B.; Rigby, J.G.

    1979-07-01

    In the fall of 1977, the Washington State Department of Natural Resources, Division of Geology and Earth Resources (WDGER), entered into a contract with the US Department of Energy, administered by Rockwell Hanford Operations (Rockwell) in Richland, Washington, as a principal contributor to a geologic study of feasibility of storing radioactive waste within Columbia River basalt. WDGER's responsibility was the production of this bibliography and a reconnaissance geologic map of the sediments overlying the Columbia River Basalt Group in the State of Washington. This bibliography is a compilation of all known published, unpublished, and open-file references dealing with geology and geophysics of the Columbia Basin of eastern Washington. The citations were obtained primarily from the WDGER and Washington State libraries; the Geo-Ref bibliographic system was also utilized. Because the WDGER portion of the study included preparation of a reconnaissance geologic map of surficial deposits in the Columbia Basin, available references dealing with this subject have been annotated. Many abstracts in the annotated section are quotations and have been copied directly from their respective publications

  1. Bibliography of the geology of the Columbia Basin and surrounding areas of Washington

    Energy Technology Data Exchange (ETDEWEB)

    Tucker, G.B.; Rigby, J.G.

    1979-07-01

    In the fall of 1977, the Washington State Department of Natural Resources, Division of Geology and Earth Resources (WDGER), entered into a contract with the US Department of Energy, administered by Rockwell Hanford Operations (Rockwell) in Richland, Washington, as a principal contributor to a geologic study of feasibility of storing radioactive waste within Columbia River basalt. WDGER's responsibility was the production of this bibliography and a reconnaissance geologic map of the sediments overlying the Columbia River Basalt Group in the State of Washington. This bibliography is a compilation of all known published, unpublished, and open-file references dealing with geology and geophysics of the Columbia Basin of eastern Washington. The citations were obtained primarily from the WDGER and Washington State libraries; the Geo-Ref bibliographic system was also utilized. Because the WDGER portion of the study included preparation of a reconnaissance geologic map of surficial deposits in the Columbia Basin, available references dealing with this subject have been annotated. Many abstracts in the annotated section are quotations and have been copied directly from their respective publications.

  2. Environmental restoration remedial action quality assurance requirements document

    International Nuclear Information System (INIS)

    Cote, R.F.

    1991-01-01

    The environmental Restoration Remedial Action Quality Assurance Requirements Document (DOE/RL 90-28) defines the quality assurance program requirements for the US Department of Energy-Richland Field Office Environmental Restoration Remedial Action Program at the Hanford Site, Richland, Washington. This paper describes the objectives outlined in DOE/RL 90-28. The Environmental Restoration Remedial Action Program implements significant commitments made by the US Department of Energy in the Hanford Federal Facility Agreement and Consent Order entered into with the Washington State Department of Ecology and the US Environmental Protection Agency

  3. 200-UP-2 operable unit radiological surveys

    International Nuclear Information System (INIS)

    Wendling, M.A.

    1994-01-01

    This report summarizes and documents the results of the radiological surveys conducted from August 17 through December 16, 1993 over a partial area of the 200-UP-2 Operable Unit, 200-W Area, Hanford Site, Richland, Washington. In addition, this report explains the survey methodology of the Mobile Surface Contamination Monitor 11 (MSCM-II) and the Ultra Sonic Ranging And Data System (USRADS). The radiological survey of the 200-UP-2 Operable Unit was conducted by the Site Investigative Surveys/Environmental Restoration Health Physics Organization of the Westinghouse Hanford Company. The survey methodology for the majority of area was based on utilization of the MSCM-II or the USRADS for automated recording of the gross beta/gamma radiation levels at or near six (6) inches from the surface soil

  4. Comparison of the Effects of Various Irrigating Solutions on Dentine Permeability.

    Science.gov (United States)

    1980-09-01

    during intra-appointment periods. Therefore, in cases of flare -up, further instrumentation with irrigation may be more effective than irrigation alone...contents than irrigation alone. . . t , . . ’ ,... ... ’ . ,. . . .. Dr. Cecic is a second year endodontic resident at Madigan Army Medical Center, Tacoma...Washington; Dr. Peters is assistant director, endodontic residency program, US Army Institute of Dental Research, Washington, DC; and Dr. Grower is

  5. Role of Mesenchymal-Derived Stem Cells in Stimulating Dormant Tumor Cells to Proliferate and Form Clinical Metastases

    Science.gov (United States)

    2017-07-01

    Clinical Metastases PRINCIPAL INVESTIGATOR: Rosandra Kaplan CONTRACTING ORGANIZATION: The Geneva Foundation Tacoma, WA 98402 REPORT DATE: July 2017...2017 4. TITLE AND SUBTITLE Role of Mesenchymal-Derived Stem Cells in Stimulating Dormant Tumor Cells to Proliferate and Form Clinical Metastases 5a...PRODUCTS:  publications, conference papers, and presentations ; Jennifer Zhu submitted an abstract and will present this work at the Annual

  6. Remedial investigation/feasibility study work plan for the 100-FR-1 operable unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1992-08-01

    Four areas of the Hanford Site (the 100, 200,300, and 1100 Areas) have been included on the US Environmental Protection Agency's (EPA's) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). Under the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement, Ecology et al. 1990a), signed by the Washington State Department of Ecology (Ecology), EPA, and the US Department of Energy (DOE), more than 1,000 inactive waste disposal and unplanned release sites on the Hanford Site have been grouped into a number of source and groundwater operable units. These operable units contain contamination in the form of hazardous waste, radioactive/hazardous mixed waste, and other CERCLA hazardous substances. This work plan and the attached supporting project plans establish the objectives, procedures, tasks, and schedule for conducting the CERCLA remedial investigation/feasibility study (RI/FS) for the 100-FR-1 operable unit. The 100-FR-1 source operable unit is one of two source operable units in the 100-F Area. Source operable units include facilities and unplanned release sites that are potential sources of hazardous substance contamination. The groundwater affected or potentially affected by the entire 100-F Area is considered as a separate operable unit, the 100-FR-3 groundwater operable unit. A separate work plan has been initiated for the 100-FR-3 operable unit (DOE/RL 1992a)

  7. Environment, Safety and Health Progress Assessment of the Hanford Site

    International Nuclear Information System (INIS)

    1992-05-01

    This report documents the result of the US Department of Energy (DOE) Environment, Safety and Health (ES ampersand H) Progress Assessment of the Hanford Site, in Richland, Washington. The assessment, which was conducted from May 11 through May 22, 1992, included a selective-review of the ES ampersand H management systems and programs of the responsible DOE Headquarters Program Offices the DOE Richland Field Office, and the site contractors. The ES ampersand H Progress Assessments are part of the Secretary of Energy's continuing effort to institutionalize line management accountability and the self-assessment process throughout DOE and its contractor organizations. The purpose of the Hanford Site ES ampersand H Progress Assessment is to provide the Secretary with an independent assessment of the adequacy and effectiveness of the DOE and contractor management structures, resources, and systems to address ES ampersand H problems and requirements. They are not intended to be comprehensive compliance assessments of ES ampersand H activities. The point of reference for assessing programs at the Hanford Site was, for the most part, the Tiger Team Assessment of the Hanford Site, which was conducted from May 21 through July 18, 1990. A summary of issues and progress in the areas of environment, safety and health, and management is included

  8. Hanford site environmental surveillance master sampling schedule

    International Nuclear Information System (INIS)

    Bisping, L.E.

    1998-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest National Laboratory (PNNL) for the U.S. Department of Energy (DOE). Sampling is conducted to evaluate levels of radioactive and nonradioactive pollutants in the Hanford environs, as required in DOE Order 5400.1 open-quotes General Environmental Protection Program,close quotes and DOE Order 5400.5, open-quotes Radiation Protection of the Public and the Environment.close quotes The sampling methods are described in the Environmental Monitoring Plan, United States Department of Energy, Richland Operations Office, DOE/RL91-50, Rev. 2, U.S. Department of Energy, Richland, Washington. This document contains the 1998 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP) and Drinking Water Monitoring Project. Each section of this document describes the planned sampling schedule for a specific media (air, surface water, biota, soil and vegetation, sediment, and external radiation). Each section includes the sample location, sample type, and analyses to be performed on the sample. In some cases, samples are scheduled on a rotating basis and may not be planned for 1998 in which case the anticipated year for collection is provided. In addition, a map is included for each media showing sample locations

  9. Collapse of the Tacoma· N arrows Bridge

    Indian Academy of Sciences (India)

    something was noticeably wrong with the bridge. The span ... So spectacular was the motion at times that the bridge was soon nicknamed Galloping. Gertie, and visitors ... A stranded car can be seen on the top right corner. ... home from Cal Tech a small rubber model of the bridge which one of my mechanics had made for ...

  10. Contaminant migration at two low-level radioactive waste sites in arid western United States - a review

    International Nuclear Information System (INIS)

    Wilshire, H.G.; Friedman, I.

    1999-01-01

    Contamination of the unsaturated zone and ground water at the Beatty, Nevada and Richland, Washington low-level radioactive waste sites shows that pathways exist for rapid lateral and vertical migration of contaminants through unconsolidated clastic sediments that comprise the 100 m-thick unsaturated zones of those arid disposal sites. Disposal of liquid wastes at the Beatty site until 1975 may have contributed to rapid migration of contaminants, but negligible amounts of liquid wastes reportedly were disposed at the Richland LLRW site and similar problems of contaminant migration exist. Pathways for vertical migration in the unsaturated zone include fractures and, at Richland, clastic dikes; lateral migration pathways likely are facies-controlled. Disturbance of the disposal sites contributed to increased infiltration of the unlined waste trenches after closure; simulations that used Beatty sample data show dramatic increases in recharge with disturbances necessary to develop the site. Because neither and arid climate nor presence of a thick unsaturated zone offer effective barriers to ground-water contamination, reliance on those factors at proposed sites such as Ward Valley, California and elsewhere is unwarranted. (orig.)

  11. Remedial investigation/feasibility study work plan for the 100-KR-1 operable unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1992-07-01

    Four areas of the Hanford Site (the 100, 200, 300, and 1100 Areas) have been included on the US Environmental Protection Agency's (EPA's) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). Figure 1-1 shows the location of these areas. Under the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement, Ecology et al. 1990a), signed by the Washington State Department of Ecology (Ecology), EPA, and the US Department of Energy (DOE), more than 1,000 inactive waste disposal and unplanned release sites on the Hanford Site have been grouped into a number of source and groundwater operable units. These operable units contain contamination in the form of hazardous waste, radioactive/hazardous mixed waste, and other CERCLA hazardous substances. Also included in the Tri-Party Agreement are 55 Resource Conservation and Recovery Act (RCRA) treatment, storage, or disposal (TSD) facilities that will be closed or permitted to operate in accordance with RCRA regulations, under the authority of Chapter 173-303 Washington Administrative Code (WAC). Some of the TSD facilities are included in the operable units. This work plan and the attached supporting project plans establish the objectives, procedures, tasks, and schedule for conducting the CERCLA remedial investigation/feasibility study (RI/FS) for the 100-KR-1 operable unit. The 100-KR-1 source operable unit is one of three source operable units in the 100-K Area. Source operable units include facilities and unplanned release sites that are potential sources of hazardous substance contamination

  12. Helping with the clean-up

    International Nuclear Information System (INIS)

    Peelle, E.

    1990-01-01

    Successes in public involvement efforts for nuclear waste management are so few that they deserve careful documentation and analysis. This paper chronicles the goals, process, problems and outcomes of one such success, the Northwest Defense Waste Citizens Forum (CF), created by the DOE-Richland manager in 1986 to advise DOE on its plans for nuclear waste disposal and cleanup of the Hanford site n eastern Washington state. In the evolving, often-controversial, highly-visible area of agency-public interactions, citizen task forces (TFs) have been shown to be useful in developing public policy at the local level. Making them work at the state level is more problematic. This case shows that a diverse, two-state citizen group can make significant contributions to complex EIS evaluations with heavy technical components. The CFs principal contribution to public policy was communication of its findings to business and professional groups, to area political representatives and state agencies, thereby laying the ground work for refocusing the Northwest upon the need for action on DW cleanup at Hanford. In going well beyond NEPA requirements for public involvement in agency decision making, DOE-Richland demonstrated innovative ways of dealing with the difficult issues of public confidence and public trust by means of agency openness, responsiveness to citizen needs for information, and good faith two-way communication. The success of this pro-active DOE initiative was due to many factors including selecting the right issue (existing wastes), structuring the CF at a broad, regional level, and intensive implementation of trust-building strategies

  13. Low-level waste disposal site geotechnical subsidence corrective measures: technical progress

    International Nuclear Information System (INIS)

    Phillips, S.J.; Winterhalder, J.A.; Gilbert, T.W.

    1983-01-01

    A geotechnical test facility has been constructed at the Hanford Site Richland Site Richland, Washington. The purpose of this facility is to quantitatively evaluate the performance of alternative technologies to ameliorate geomechanical subsidence in solid waste burial structures. Alternatives to be tested include; accelerating mass ground surface impact, and two optional subsurface rod injection/withdrawal techniques. The alternatives involve the principle of dynamic consolidation of buried waste and matrix materials. A description of the geotechnical test facility, the monitoring instrumentation used therein, laboratory soil mechanics data evaluation, and facility baseline monitoring data are presented. 6 references, 5 figures

  14. BEATRIX-II Program, January 1989--December 1989: ANNEX-III to IEA implementing agreement for a programme of research and development on radiation damage in fusion materials

    International Nuclear Information System (INIS)

    Slagle, O.D.; Hollenberg, G.W.

    1990-10-01

    BEATRIX-II is an International Energy Agency (IEA) sponsored collaborative experiment among Japan, Canada, and the United States. The purpose of the experiment is to evaluate the performance of ceramic solid breeder materials in a fast neutron environment. To do this, an in-situ tritium recovery experiment is being conducted in the Fast Flux Test Facility (FFTF), located on the Hanford site near Richland, Washington, and operated by Westinghouse Hanford Company (WHC). The Pacific Northwest Laboratory (PNL), Richland, Washington, together with the Japan Atomic Energy Research Institute (JAERI) and Atomic Energy of Canada Limited (AECL) are responsible for conducting the experiment

  15. Final Hanford Comprehensive Land-Use Plan Environmental Impact Statement, Hanford Site, Richland, Washington

    Energy Technology Data Exchange (ETDEWEB)

    N/A

    1999-10-01

    This Final ''Hanford Comprehensive Land-Use Plan Environmental Impact Statement'' (HCP EIS) is being used by the Department of Energy (DOE) and its nine cooperating and consulting agencies to develop a comprehensive land-use plan (CLUP) for the Hanford Site. The DOE will use the Final HCP EIS as a basis for a Record of Decision (ROD) on a CLUP for the Hanford Site. While development of the CLUP will be complete with release of the HCP EIS ROD, full implementation of the CLUP is expected to take at least 50 years. Implementation of the CLUP would begin a more detailed planning process for land-use and facility-use decisions at the Hanford Site. The DOE would use the CLUP to screen proposals. Eventually, management of Hanford Site areas would move toward the CLUP land-use goals. This CLUP process could take more than 50 years to fully achieve the land-use goals.

  16. Engineering and planning for reactor 105-C interim safe storage project subcontract no. 0100C-SC-G0001 conceptual design report. Volume 1

    International Nuclear Information System (INIS)

    1996-04-01

    The 105-C Reactor, one of eight surplus production reactors at the Hanford Site, has been proposed by the U.S. Department of Energy, Richland, Operations Office to be the first large-scale technology demonstration project in the decontamination and decommissioning (D ampersand D) focus area as part of the project for dismantlement and interim safe storage. The 105-C Reactor will be placed in an interim safe storage condition, then undergo the decontamination and decommissioning phase. After D ampersand D, the reactor will be placed in long- term safe storage. This report provides the conceptual design for these activities

  17. MIDAS: an effective tool for work management

    International Nuclear Information System (INIS)

    Ball, D.L.; Billings, M.P.; McCargar, S.B.; Talbot, M.D.; Topping, C.F.

    1985-01-01

    The computerized Master Information Data Acquisition System (MIDAS) is used to control work at facilities that support the Liquid Metal Reactor (LMR) program on the Hanford Site at Richland, Washington. Functions of this software system are to: track authorized maintenance activities, enhance operational safety, track schedule, manpower, and material constraints during work preparation, provide a management tool for quality measurement techniques, and provide an overall repository for technical and safety-related information on components at the Hanford Site 400 Area facilities. This paper describes MIDAS and how it is used as a work management tool. 1 fig

  18. Role of Mesenchymal Derived Stem Cells in Stimulating Dormant Tumor Cells to Proliferate and Form Clinical Metastases

    Science.gov (United States)

    2017-07-01

    Clinical Metastases PRINCIPAL INVESTIGATOR: Jeffrey Green CONTRACTING ORGANIZATION: The Geneva Foundation Tacoma, WA 98402 REPORT DATE: July 2017 TYPE...2016 - 14 June 2017 4. TITLE AND SUBTITLE Role of Mesenchymal-Derived Stem Cells in Stimulating Dormant Tumor Cells to Proliferate and Form Clinical ...and/or select agents. Nothing to report. 6. PRODUCTS: • publications, conference papers, and presentations ; Jennifer Zhu submitted an abstract and will

  19. State Waste Discharge Permit application, 100-N Sewage Lagoon

    International Nuclear Information System (INIS)

    1994-06-01

    As part of the Hanford Federal Facility Agreement and Consent Order negotiations (Ecology et al. 1994), the US Department of Energy, Richland Operations Office, the US Environmental Protection Agency, and the Washington State Department of Ecology agreed that liquid effluent discharges to the ground on the Hanford Site which affect groundwater or have the potential to affect groundwater would be subject to permitting under the structure of Chapter 173--216 (or 173--218 where applicable) of the Washington Administrative Code, the State Waste Discharge Permit Program. As a result of this decision, the Washington State Department of Ecology and the US Department of Energy, Richland Operations Office entered into Consent Order No. DE 91NM-177, (Ecology and DOE-RL 1991). This document constitutes the State Waste Discharge Permit application for the 100-N Sewage Lagoon. Since the influent to the sewer lagoon is domestic waste water, the State Waste Discharge Permit application for Public Owned Treatment Works Discharges to Land was used. Although the 100-N Sewage Lagoon is not a Public Owned Treatment Works, the Public Owned Treatment Works application is more applicable than the application for industrial waste water. The 100-N Sewage Lagoon serves the 100-N Area and other Hanford Site areas by receiving domestic waste from two sources. A network of sanitary sewer piping and lift stations transfers domestic waste water from the 100-N Area buildings directly to the 100-N Sewage Lagoon. Waste is also received by trucks that transport domestic waste pumped from on site septic tanks and holding tanks. Three ponds comprise the 100-N Sewage Lagoon treatment system. These include a lined aeration pond and stabilization pond, as well as an unlined infiltration pond. Both piped-in and trucked-in domestic waste is discharged directly into the aeration pond

  20. RCRA facility investigation/corrective measures study work plan for the 100-HR-1 operable unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1992-09-01

    Four areas of the Hanford Site (the 100, 200, 300, and 1100 Areas) have been included on the US. Environmental Protection Agency's (EPA's) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). Under the Hanford Federal Facility Agreement and Consent Order, signed by the Washington State Department of Ecology (Ecology), EPA, and the US Department of Energy (DOE), more than 1,000 inactive waste disposal and unplanned release sites on the Hanford Site have been grouped into a number of source and groundwater operable units. These operable units contain contamination in the form of hazardous waste, radioactive/hazardous mixed waste, and other CERCLA hazardous substances. This work plan and the attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the RCRA facility investigation/corrective measures study (RFI/CMS) for the 100-HR-1 source operable unit. Source operable units include facilities and unplanned release sites that are potential sources of contamination. The 100-HR-3 operable unit underlies the D/DR and H Areas, the 600 Area between them, and the six source operable units these areas contain. The 100-HR-3 operable unit includes all contamination found in the aquifer soils and water within its boundary. Separate work plans have been initiated for the 100-HR-3 groundwater operable unit (DOE-RL 1992a) and the 100-DR-1 (DOE-RL 1992b) source operable units

  1. Environmental assessment of SP-100 ground engineering system test site: Hanford Site, Richland, Washington

    Energy Technology Data Exchange (ETDEWEB)

    1988-12-01

    The US Department of Energy (DOE) proposes to modify an existing reactor containment building (decommissioned Plutonium Recycle Test Reactor (PRTR) 309 Building) to provide ground test capability for the prototype SP-100 reactor. The 309 Building (Figure 1.1) is located in the 300 Area on the Hanford Site in Washington State. The National Environmental Policy Act (NEPA) requires that Federal agencies assess the potential impacts that their actions may have on the environment. This Environmental Assessment describes the consideration given to environmental impacts during reactor concept and test site selection, examines the environmental effects of the DOE proposal to ground test the nuclear subsystem, describes alternatives to the proposed action, and examines radiological risks of potential SP-100 use in space. 73 refs., 19 figs., 7 tabs.

  2. HANFORD SITE SUSTAINABILITY PROGRAM RICHLAND WASHINGTON - 12464

    Energy Technology Data Exchange (ETDEWEB)

    FRITZ LL

    2012-01-12

    In support of implementation of Executive Order (EO) 13514, Federal Leadership in Environmental, Energy and Economic Performance, the Hanford Site Sustainability Plan was developed to implement strategies and activities required to achieve the prescribed goals in the EO as well as demonstrate measurable progress in environmental stewardship at the Hanford Site. The Hanford Site Sustainability Program was developed to demonstrate progress towards sustainability goals as defined and established in Executive Order (EO) 13514, Federal Leadership in Environmental, Energy and Economic Performance; EO 13423, Strengthening Federal Environmental, Energy and Transportation Management, and several applicable Energy Acts. Multiple initiatives were undertaken in Fiscal Year (FY) 2011 to implement the Program and poise the Hanford Site as a leader in environmental stewardship. In order to implement the Hanford Site Sustainability Program, a Sustainability Plan was developed in conjunction with prime contractors, two U.S. Department of Energy (DOE) Offices, and key stakeholders to serve as the framework for measuring progress towards sustainability goals. Based on the review of these metrics and future plans, several activities were initiated to proactively improve performance or provide alternatives for future consideration contingent on available funding. A review of the key metric associated with energy consumption for the Hanford Site in FY 2010 and 2011 indicated an increase over the target reduction of 3 percent annually from a baseline established in FY 2003 as illustrated in Figure 1. This slight increase was attributed primarily from the increased energy demand from the cleanup projects funded by the American Recovery and Reinvestment Act (ARRA) in FY 2010 and 2011. Although it is forecasted that the energy demand will decrease commensurate with the completion of ARRA projects, several major initiatives were launched to improve energy efficiency.

  3. WALCOTT TOWNSHIP HYDRAULICS, RICHLAND COUNTY, ND, USA

    Data.gov (United States)

    Federal Emergency Management Agency, Department of Homeland Security — Recent developments in digital terrain and geospatial database management technology make it possible to protect this investment for existing and future projects to...

  4. The U.S. Department of Energy pollution prevention program: Applications for small business

    Energy Technology Data Exchange (ETDEWEB)

    Betsch, M.D.

    1997-05-14

    This report shows the benefits small businesses can realize by instituting cost-effective pollution prevention improvements. It is a series of pollution prevention assessments that were conducted at small businesses in Richland, Washington. It describes a technology transfer test of US Department of Energy (USDOE) pollution prevention methods to small businesses through eleven pollution prevention assessments conducted at small businesses in the city of Richland. The assessment method tested was first developed at the USDOE Hanford Site, located in Richland, Washington. Two pilot studies were initially conducted to determine the usefulness of the assessment method for small businesses. Then, four additional pollution prevention assessments were conducted using a refined process. In order to determine the assessment method`s usefulness by different practitioners, a number of the assessments contained in this report were conducted by the undergraduate and graduate students at Washington State University at Tri-Cities as part of their class projects. These students were trained in the pollution prevention assessment process by the author of this report and conducted five small business assessments using the same methods and materials as in the remainder of the study.

  5. The U.S. Department of Energy pollution prevention program: Applications for small business

    International Nuclear Information System (INIS)

    Betsch, M.D.

    1997-01-01

    This report shows the benefits small businesses can realize by instituting cost-effective pollution prevention improvements. It is a series of pollution prevention assessments that were conducted at small businesses in Richland, Washington. It describes a technology transfer test of US Department of Energy (USDOE) pollution prevention methods to small businesses through eleven pollution prevention assessments conducted at small businesses in the city of Richland. The assessment method tested was first developed at the USDOE Hanford Site, located in Richland, Washington. Two pilot studies were initially conducted to determine the usefulness of the assessment method for small businesses. Then, four additional pollution prevention assessments were conducted using a refined process. In order to determine the assessment method's usefulness by different practitioners, a number of the assessments contained in this report were conducted by the undergraduate and graduate students at Washington State University at Tri-Cities as part of their class projects. These students were trained in the pollution prevention assessment process by the author of this report and conducted five small business assessments using the same methods and materials as in the remainder of the study

  6. Clinical Investigation.

    Science.gov (United States)

    1979-09-30

    Zbylski, LaRossa, Cullington: A Simple Method of Rapid Assessment of Malar Depression . Annals of Plastic Surgery, Aug 79. Urology Service Fauver, H.E...J.R.: ST Depression Suggesting Subendocardial Ischemia in Neonates with PDA. Presented: Eighth Annual Army Association of Cardiok yy tt,eting, Tacoma...79/100 Investigation of the Tumor Reduction Effect of Combined Sodium-L-Ascorbate and 5FU Chemotherapy in Transplanted B16 Melanoma of Mice. (O

  7. Dollar Summary of Prime Contract Awards by State, Place, and Contractor, FY84, Part 5, (Ashton, Rhode Island-Sinclair, Wyoming).

    Science.gov (United States)

    1984-01-01

    BERGSTROM AIR FORCE CITY OF AUSTIN 4,745 4,745 CPT CORPORATION 66 66 CSR CONTRACTING INC 554 554 DAILEY...317 STARBUCK INDUSTRIAL PUMP SALES COM 147 147 RIDGE CONSTRUCTION CO INC 240 240 SIUSLAW CONSTRUCTION 352 352 SPOONER MECHANICAL CONTRS 226 226 TOTAL... STARBUCK 965 965 STEVENSON BLOCH LUMBER COMPANY 44 44 SUMNER SPACE TECH ENGINEERING INC 762 762 SUNNYSIDE INDEPENDENT FOOD PROCSSRS CORP 86 66 TACOMA

  8. Design and operation of the 30-MJ superconducting magnetic-storage system on the Bonneville Power Administration bus

    International Nuclear Information System (INIS)

    Schermer, R.I.; Barron, M.H.; Boenig, H.J.

    1983-01-01

    A superconducting magnetic-energy-storage (SMES) unit is suitable for power-system stabilization because it can provide positive damping by absorbing or releasing energy with a relatively fast response time, 10 ms. In the fall of 1982, an SMES unit was installed at the Tacoma Substation of the Bonneville Power Administration as an experiment in monitoring, predicting and improving system stability. This paper reports principally on the system testing

  9. Validation of Biomarkers for Prostate Cancer Prognosis

    Science.gov (United States)

    2016-11-01

    subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. PLEASE...challenge, we formed the multi-institutional Canary Tissue Microarray Project. We have used rigorous clinical trial case/cohort design, taking care to...concluded that TACOMA algorithm as it currently stands, it is inadequate for automatic imaging reading. The main reason is that it still requires

  10. Hanford Site radionuclide national emission standards for hazardous air pollutants registered stack source assessment

    Energy Technology Data Exchange (ETDEWEB)

    Davis, W.E.; Barnett, J.M.

    1994-07-01

    On February 3, 1993, the US Department of Energy, Richland Operations Office received a Compliance Order and Information Request from the Director of the Air and Toxics Division of the US Environmental Protection Agency,, Region 10. The Compliance Order requires the Richland Operations Office to evaluate all radionuclide emission points at the Hanford Site . The evaluation also determined if the effective dose equivalent from any of these stack emissions exceeded 0.1 mrem/yr, which will require the stack to have continuous monitoring. The result of this assessment identified a total of 16 stacks as having potential emissions that,would cause an effective dose equivalent greater than 0.1 mrem/yr.

  11. Hanford Site radionuclide national emission standards for hazardous air pollutants registered stack source assessment

    International Nuclear Information System (INIS)

    Davis, W.E.; Barnett, J.M.

    1994-01-01

    On February 3, 1993, the US Department of Energy, Richland Operations Office received a Compliance Order and Information Request from the Director of the Air and Toxics Division of the US Environmental Protection Agency,, Region 10. The Compliance Order requires the Richland Operations Office to evaluate all radionuclide emission points at the Hanford Site . The evaluation also determined if the effective dose equivalent from any of these stack emissions exceeded 0.1 mrem/yr, which will require the stack to have continuous monitoring. The result of this assessment identified a total of 16 stacks as having potential emissions that,would cause an effective dose equivalent greater than 0.1 mrem/yr

  12. Remedial investigation/feasibility study work plan for the 300-FF-1 operable unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1990-03-01

    Over 1,400 waste facilities have been identified on the Hanford Site. Most of the waste facilities are located within geographic areas on the Hanford Site that are referred to as the 100, 200, 300, 400, and 1100 areas. The purpose of this work plan is to document the project scoping process and to outline all remedial investigation/feasibility study (RI/FS) activities, to determine the nature and extent of the threat presented by releases of hazardous substances from the operable unit, and to evaluate proposed remedies for such releases. The goal of the 300-FF-1 remedial investigation (RI) is to provide sufficient information needed to conduct the feasibility study (FS), by determining the nature and extent of the threat to public health and the environment posed by releases of hazardous substances from 300-FF-1, and the performance of specific remedial technologies. 62 refs., 28 figs., 48 tabs

  13. Hanford B Reactor Building Hazard Assessment Report

    International Nuclear Information System (INIS)

    Griffin, P. W.

    1999-01-01

    The 105-B Reactor (hereinafter referred to as B Reactor) is located in the 100 Area of the Hanford Site near Richland, Washington. The B Reactor is one of nine plutonium production reactors that were constructed in the 1940s during the Cold War Era. Construction of the B Reactor began June 7, 1943, and operation began on September 26, 1944. The Environmental Restoration Contractor was requested by RL to provide an assessment/characterization of the B Reactor building to determine and document the hazards that are present and could pose a threat to the environment and/or to individuals touring the building. This report documents the potential hazards, determines the feasibility of mitigating the hazards, and makes recommendations regarding areas where public tour access should not be permitted

  14. RCRA facility investigation/corrective measures study work plan for the 100-HR-3 operable unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1992-09-01

    Four areas of the Hanford Site (the 100, 200, 300, and 1100 Areas) have been included on the US Environmental Protection Agency's (EPA's) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). Under the Hanford Federal Facility Agreement and Consent Order, signed by the Washington State Department of Ecology (Ecology), EPA, and the US Department of Energy (DOE), more than 1000 inactive waste disposal and unplanned release sites on the Hanford Site have been grouped into a number of source and groundwater operable units. These operable units contain contamination in the form of hazardous waste, radioactive/hazardous mixed waste, and other CERCLA hazardous substances. Also included in the Tri-Party Agreement are 55 Resource Conservation and Recovery Act (RCRA) treatment, storage, or disposal (TSD) facilities that will be closed or permitted to operate in accordance with RCRA regulations, under the authority of Chapter 173-303 Washington Administrative Code (WAC). Some of the TSD facilities are included in the operable units. This work plan and the attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the RCRA facility investigation/corrective measures study (RFI/CMS) for the 100-HR-3 operable unit. The 100-HR-3 operable unit underlies the D/DR and H Areas, the 600 Area between them, and the six source operable units these areas contain. The 100-HR-3 operable unit includes all contamination found in the aquifer soils and water within its boundary. Source operable units include facilities and unplanned release sites that are potential sources of contamination. Separate work plans have been initiated for the 100-DR-1 (DOE-RL 1992a) and 100-HR-1 (DOE-RL 1992b) source operable units

  15. Final characterization report for the 100-B/C small buildings

    International Nuclear Information System (INIS)

    Harris, R.A.

    1996-09-01

    This report is a compilation of data collected during the period of July 1, 1996 through July 15, 1996. The scope of the report is limited to the 103-B Riggers Loft, 1608-B Vacuum and Pressure Seal Pit, 1701-BA Exclusion Area Badge House, and 1714-C Solvent Storage Facility. (These facilities are located at the Hanford Site in Richland, Washington). The characterization activities were organized and implemented to evaluate the radiological status and identify any hazardous materials. The data contained in this report reflects the current conditions and status of the above mentioned facilities. This information is intended to be utilized in support of future building decontamination and demolition

  16. Spent Nuclear Fuel Project FY 1996 Multi-Year Program Plan WBS No. 1.4.1, Revision 1

    International Nuclear Information System (INIS)

    1995-09-01

    This document describes the Spent Nuclear Fuel (SNF) Project portion of the Hanford Strategic Plan for the Hanford Reservation in Richland, Washington. The SNF Project was established to evaluate and integrate the urgent risks associated with N-reactor fuel currently stored at the Hanford site in the K Basins, and to manage the transfer and disposition of other spent nuclear fuels currently stored on the Hanford site. An evaluation of alternatives for the expedited removal of spent fuels from the K Basin area was performed. Based on this study, a Recommended Path Forward for the K Basins was developed and proposed to the U.S. DOE

  17. Spent Nuclear Fuel Project FY 1996 Multi-Year Program Plan WBS No. 1.4.1, Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    This document describes the Spent Nuclear Fuel (SNF) Project portion of the Hanford Strategic Plan for the Hanford Reservation in Richland, Washington. The SNF Project was established to evaluate and integrate the urgent risks associated with N-reactor fuel currently stored at the Hanford site in the K Basins, and to manage the transfer and disposition of other spent nuclear fuels currently stored on the Hanford site. An evaluation of alternatives for the expedited removal of spent fuels from the K Basin area was performed. Based on this study, a Recommended Path Forward for the K Basins was developed and proposed to the U.S. DOE.

  18. Mitigation action plan for the 100-KR-4, 100-HR-3 pump and treat

    International Nuclear Information System (INIS)

    Weiss, S.G.

    1996-10-01

    This project involves drilling 22 wells, improving access roads to existing new wells, laying connecting pipes, and constructing groundwater treatment facilities in the 100-KR-4 and 100-HR-3 Operable Units. These facilities are located at the Hanford Site in Richland, Washington. The drilling is expected to be completed by October 1996, but the treatment operations will continue for approximately 10 years. Thirteen of the new wells are to be placed in the 100-K Area, five in the 100-H Area, and four in the 100-D Area. A 4 km (2.5 mi) pipeline will run from the wells at the 100-D Area to the treatment facility at the 100-H Area. The 116-K-2 Trench received reactor effluents from 1955 to 1971. It is 1,460 m long by 16.4 m wide by 5.5 m deep with spoil pits at the surface on both sides. Washouts occurred during operation, causing several surface contamination areas between the trench and river that were covered with a few feet of soil

  19. Management of Hanford Site non-defense production reactor spent nuclear fuel, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1997-03-01

    The US Department of Energy (DOE) needs to provide radiologically, and industrially safe and cost-effective management of the non-defense production reactor spent nuclear fuel (SNF) at the Hanford Site. The proposed action would place the Hanford Site's non-defense production reactor SNF in a radiologically- and industrially-safe, and passive storage condition pending final disposition. The proposed action would also reduce operational costs associated with storage of the non-defense production reactor SNF through consolidation of the SNF and through use of passive rather than active storage systems. Environmental, safety and health vulnerabilities associated with existing non-defense production reactor SNF storage facilities have been identified. DOE has determined that additional activities are required to consolidate non-defense production reactor SNF management activities at the Hanford Site, including cost-effective and safe interim storage, prior to final disposition, to enable deactivation of facilities where the SNF is now stored. Cost-effectiveness would be realized: through reduced operational costs associated with passive rather than active storage systems; removal of SNF from areas undergoing deactivation as part of the Hanford Site remediation effort; and eliminating the need to duplicate future transloading facilities at the 200 and 400 Areas. Radiologically- and industrially-safe storage would be enhanced through: (1) removal from aging facilities requiring substantial upgrades to continue safe storage; (2) utilization of passive rather than active storage systems for SNF; and (3) removal of SNF from some storage containers which have a limited remaining design life. No substantial increase in Hanford Site environmental impacts would be expected from the proposed action. Environmental impacts from postulated accident scenarios also were evaluated, and indicated that the risks associated with the proposed action would be small

  20. Automatic fire hydrant valve development

    International Nuclear Information System (INIS)

    Drumheller, K.

    1976-01-01

    The development of a remotely-controlled valve to operate a fire hydrant is described. Assembled from off-the-shelf components, the prototype illustrates that a valve light enough to be handled by one man is possible. However, it does not have the ruggedness or reliability needed for actual fire-fighting operations. Preliminary testing by City of Tacoma fire department personnel indicates that the valve may indeed contribute significantly to fire-fighting efficiency

  1. 76 FR 19290 - Safety Zone; Commencement Bay, Tacoma, WA

    Science.gov (United States)

    2011-04-07

    ... blue. In the ``Document Type'' drop down menu select ``Proposed Rule'' and insert ``USCG-2011-0197'' in... , click on the ``read comments'' box, which will then become highlighted in blue. In the ``Keyword'' box..., Longitude 122[deg]29'14'' W; thence returning to the origin. This safety zone resembles a rectangle...

  2. Revising the NOx BACT Limit at Simpson Tacoma Kraft

    Science.gov (United States)

    This document may be of assistance in applying the New Source Review (NSR) air permitting regulations including the Prevention of Significant Deterioration (PSD) requirements. This document is part of the NSR Policy and Guidance Database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  3. Lessons learned during the development and conduct of exercise Fermont

    International Nuclear Information System (INIS)

    Faulk, S.M.

    1995-04-01

    On September 22--23, 1993, the DOE, Richland Operations Office (RL) in Richland, Washington conducted a major field exercise named Fremont. This exercise tested the ability of the Site emergency organization and the State and local emergency organizations in both Washington and Oregon to take the appropriate actions to mitigate a major emergency and to protect the citizens of the region. The exercise involved initial emergency activities as well as intermediate and late phase actions including relocation and ingestion activities. A major element of the exercise was the participation of the Federal Radiological Monitoring and Assessment Center (FRMAC). This was the first major exercise that a DOE site requested a full FRMAC participation in a nonclassified environment

  4. Radiological Calibration and Standards Facility

    Data.gov (United States)

    Federal Laboratory Consortium — PNNL maintains a state-of-the-art Radiological Calibration and Standards Laboratory on the Hanford Site at Richland, Washington. Laboratory staff provide expertise...

  5. 78 FR 29612 - Prevailing Rate Systems; Redefinition of the Minneapolis-St. Paul, MN, and Southwestern Wisconsin...

    Science.gov (United States)

    2013-05-21

    ... Renville Rice Sherburne Sibley Stearns Steele Stevens Swift Todd Traverse Wabasha Wadena Waseca Watonwan... Langlade Lincoln Marathon Marinette Menominee Oneida Pepin Portage Price Richland Rusk Shawano Taylor...

  6. 76 FR 45644 - Montana Disaster Number MT-00063

    Science.gov (United States)

    2011-07-29

    ..., Liberty, Madison, Park, Pondera, Powell, Ravalli, Richland, Sheridan, Teton, Toole, and the Blackfeet... Federal Domestic Assistance Numbers 59002 and 59008) James E. Rivera, Associate Administrator for Disaster...

  7. Startup of the New 200 West Pump-and-Treat, Hanford Site, Richland, Washington - 13214

    Energy Technology Data Exchange (ETDEWEB)

    Byrnes, Mark E. [CH2M HILL Plateau Remediation Company, Richland, Washington (United States); Simmons, Sally [Fluor Federal Services, Richland, Washington (United States); Morse, John [U.S. Department of Energy, Richland Operations Office, Richland, Washington (United States)

    2013-07-01

    On June 28, 2012, CH2M HILL Plateau Remediation Company (CHPRC) completed the construction and acceptance testing for a new 2,500 gallon-per-minute (gpm) pump-and-treat (P and T) system in the 200 West Area of the Hanford Site in Washington State. This system is designed to remove Tc-99, carbon tetrachloride, trichloroethene (TCE), nitrate, and total and hexavalent chromium from groundwater using ion exchange, anoxic and aerobic bioreactors, and air stripping. The system will eventually remove uranium from groundwater using ion exchange as well. The startup of the P and T system is important because it will ensure that contaminants from the 200 West Area never reach the Columbia River. When fully operational, the 200 West P and T will include approximately 23 extraction wells and 21 injection wells. The extraction wells are 8 inches in diameter, are completed with well screens 100 feet or more in length, and are distributed throughout the central portion of the 5-square-mile carbon tetrachloride plume. The injection wells are also 8 inches in diameter and are installed up-gradient of the plumes to recharge the aquifer and down-gradient of the plumes for flow-path control. Groundwater in the 200 West Area is approximately 250 feet below ground surface, and the aquifer is 200 feet or more in thickness. All of the contaminants (except nitrate) are found within the perimeter of the carbon tetrachloride plume and occur at various depths throughout the aquifer. The 200 West P and T consists of two separate buildings to conduct groundwater treatment. The RAD building contains an ion exchange system to remove Tc-99 from groundwater at a maximum flow rate of 600 gpm. The RAD building only accepts water from those extraction wells showing elevated Tc-99 concentrations. Groundwater initially fills an influent tank, is then pumped through particulate filters (to remove suspended materials), and then passes through two parallel treatment trains containing Purolite{sup R} A530E

  8. Startup of the New 200 West Pump-and-Treat, Hanford Site, Richland, Washington - 13214

    International Nuclear Information System (INIS)

    Byrnes, Mark E.; Simmons, Sally; Morse, John

    2013-01-01

    On June 28, 2012, CH2M HILL Plateau Remediation Company (CHPRC) completed the construction and acceptance testing for a new 2,500 gallon-per-minute (gpm) pump-and-treat (P and T) system in the 200 West Area of the Hanford Site in Washington State. This system is designed to remove Tc-99, carbon tetrachloride, trichloroethene (TCE), nitrate, and total and hexavalent chromium from groundwater using ion exchange, anoxic and aerobic bioreactors, and air stripping. The system will eventually remove uranium from groundwater using ion exchange as well. The startup of the P and T system is important because it will ensure that contaminants from the 200 West Area never reach the Columbia River. When fully operational, the 200 West P and T will include approximately 23 extraction wells and 21 injection wells. The extraction wells are 8 inches in diameter, are completed with well screens 100 feet or more in length, and are distributed throughout the central portion of the 5-square-mile carbon tetrachloride plume. The injection wells are also 8 inches in diameter and are installed up-gradient of the plumes to recharge the aquifer and down-gradient of the plumes for flow-path control. Groundwater in the 200 West Area is approximately 250 feet below ground surface, and the aquifer is 200 feet or more in thickness. All of the contaminants (except nitrate) are found within the perimeter of the carbon tetrachloride plume and occur at various depths throughout the aquifer. The 200 West P and T consists of two separate buildings to conduct groundwater treatment. The RAD building contains an ion exchange system to remove Tc-99 from groundwater at a maximum flow rate of 600 gpm. The RAD building only accepts water from those extraction wells showing elevated Tc-99 concentrations. Groundwater initially fills an influent tank, is then pumped through particulate filters (to remove suspended materials), and then passes through two parallel treatment trains containing Purolite R A530E resin

  9. Remedial Investigation/Feasibility Study Work Plan for the 200-UP-1 Groundwater Operable Unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1994-01-01

    This work plan identifies the objectives, tasks, and schedule for conducting a Remedial Investigation/Feasibility Study for the 200-UP-1 Groundwater Operable Unit in the southern portion of the 200 West Groundwater Aggregate Area of the Hanford Site. The 200-UP-1 Groundwater Operable Unit addresses contamination identified in the aquifer soils and groundwater within its boundary, as determined in the 200 West Groundwater Aggregate Area Management Study Report (AAMSR) (DOE/RL 1992b). The objectives of this work plan are to develop a program to investigate groundwater contaminants in the southern portion of the 200 West Groundwater Aggregate Area that were designated for Limited Field Investigations (LFIs) and to implement Interim Remedial Measures (IRMs) recommended in the 200 West Groundwater AAMSR. The purpose of an LFI is to evaluate high priority groundwater contaminants where existing data are insufficient to determine whether an IRM is warranted and collect sufficient data to justify and implement an IRM, if needed. A Qualitative Risk Assessment (QRA) will be performed as part of the LFI. The purpose of an IRM is to develop and implement activities, such as contaminant source removal and groundwater treatment, that will ameliorate some of the more severe potential risks of groundwater contaminants prior to the RI and baseline Risk Assessment (RA) to be conducted under the Final Remedy Selection (FRS) at a later date. This work plan addresses needs of a Treatability Study to support the design and implementation of an interim remedial action for the Uranium- 99 T c -Nitrate multi-contaminant IRM plume identified beneath U Plant

  10. Examining the impact of Culture's consequences: a three-decade, multilevel, meta-analytic review of Hofstede's cultural value dimensions.

    Science.gov (United States)

    Taras, Vas; Kirkman, Bradley L; Steel, Piers

    2010-05-01

    Using data from 598 studies representing over 200,000 individuals, we meta-analyzed the relationship between G. Hofstede's (1980a) original 4 cultural value dimensions and a variety of organizationally relevant outcomes. First, values predict outcomes with similar strength (with an overall absolute weighted effect size of rho = 0.18) at the individual level of analysis. Second, the predictive power of the cultural values was significantly lower than that of personality traits and demographics for certain outcomes (e.g., job performance, absenteeism, turnover) but was significantly higher for others (e.g., organizational commitment, identification, citizenship behavior, team-related attitudes, feedback seeking). Third, cultural values were most strongly related to emotions, followed by attitudes, then behaviors, and finally job performance. Fourth, cultural values were more strongly related to outcomes for managers (rather than students) and for older, male, and more educated respondents. Fifth, findings were stronger for primary, rather than secondary, data. Finally, we provide support for M. Gelfand, L. H. Nishii, and J. L. Raver's (2006) conceptualization of societal tightness-looseness, finding significantly stronger effects in culturally tighter, rather than looser, countries. PsycINFO Database Record (c) 2010 APA, all rights reserved.

  11. 78 FR 15358 - DOE's Preferred Alternative for Certain Tanks Evaluated in the Final Tank Closure and Waste...

    Science.gov (United States)

    2013-03-11

    ... SUPPLEMENTARY INFORMATION.) \\1\\ Transuranic (TRU) waste is waste that contains alpha particle-emitting... Document Manager, Office of River Protection, U.S. Department of Energy, P.O. Box 1178, Richland...

  12. Wynoochee Lake and dam flood storage reevaluation study

    International Nuclear Information System (INIS)

    Lynch, C.J.

    1993-01-01

    With the desire to increase the revenue generating potential of the Wynoochee Lake and Dam Project the cities of Tacoma and Aberdeen, Washington, have pursued the potential for retrofitting a hydropower plant at the dam. The feasibility of the hydropower plant is dependent on higher average head for power generation. This paper discusses the Corps of Engineers reevaluation of the winter flood control requirements with the aim of raising the elevation of the winter operating pool

  13. Radioactive air emissions notice of construction for the 105N Basin Stabilization

    International Nuclear Information System (INIS)

    Coenenberg, E.T.

    1994-01-01

    The 105N Basin (basin) Stabilization will place the basin in a radiologically and environmentally safe condition so that it can be decommissioned at a later date. The basin is in the 105N Building, which is located in the 100N Area. The 100N Area is located in the Northern portion of the Hanford Site approximately 35 miles northwest of the city of Richland, Washington. The basin stabilization objectives are to inspect for Special Nuclear Material (SNM) (i.e., fuel assemblies and fuel pieces), remove the water from the basin and associated pits, and stabilize the basin surface. The stabilization will involve removal of basin hardware, removal of basin sediments, draining of basin water, and cleaning and stabilizing basin surfaces to prevent resuspension of radioactive emissions to the air. These activities will be conducted in accordance with all applicable regulations

  14. Hanford Site Performance Report - March 1999

    International Nuclear Information System (INIS)

    EDER, D.M.

    2001-01-01

    The purpose of the Hanford Site Performance Report is to provide the Department of Energy Richland Operations Office's (DOE-RL's) report of Hanford's performance by: U.S. Department of Energy, Richland Operations Office, Project Hanford Management Contract (PHMC) through Fluor Daniel Hanford, Inc. (FDH) and its subcontractors, Environmental Restoration Contract through Bechtel Hanford, Inc. (BHI), and its subcontractors, and Pacific Northwest National Laboratories (PNNL) for Science and Technology (S and T) Mission and support to the Environmental Management (EM). This report is published monthly with the intent of relating work performance and progress in the context of the Success Indicators and Critical Success Factors as outlined in the Hanford Strategic Plan. On a quarterly basis, the report also addresses performance and progress related to the Science and Technology Mission's Critical Outcomes as derived from the Hanford Strategic Plan. Section A of this report is the Executive Summary, encapsulating high-level data in this report into an overall brief. Summary information provided includes Notable Accomplishments, a performance profile with associated analyses, Critical Issues, Key Integration Activities, and a ''quick list'' of Upcoming Key Events. Section B of this report, the Site Summary section, provides Environmental Management performance data specifically organized to the pertinent Critical Success Factors and Success Indicators, and Science and Technology data in the context of the Critical Outcomes. The Site Summary demonstrates the various missions' overall progress against these strategic objectives. The information is presented in both narrative and graphical formats. The remaining sections provide performance data relative to each individual mission area (e.g., Waste Management, Spent Nuclear Fuels, etc.). The information provided in the Mission Area sections is at a level of greater detail than is presented in either the Executive Summary or

  15. Hanford Site Performance Report - May 1999

    International Nuclear Information System (INIS)

    EDER, D.M.

    2001-01-01

    The purpose of the Hanford Site Performance Report is to provide the Department of Energy Richland Operations Office's (DOE-RL's) report of Hanford's performance by: U. S. Department of Energy, Richland Operations Office, Project Hanford Management Contract (PHMC) through Fluor Daniel Hanford, Inc. (FDH) and its subcontractors, Environmental Restoration Contract through Bechtel Hanford, Inc. (BHI), and its subcontractors, and Pacific Northwest National Laboratories (PNNL) for Science and Technology (S and T) Mission and support to the Environmental Management (EM). This report is published monthly with the intent of relating work performance and progress in the context of the Success Indicators and Critical Success Factors as outlined in the Hanford Strategic Plan. On a quarterly basis, the report also addresses performance and progress related to the Science and Technology Mission's Critical Outcomes as derived from the Hanford Strategic Plan. Section A of this report is the Executive Summary, encapsulating high-level data in this report into an overall brief. Summary information provided includes Notable Accomplishments, a performance profile with associated analyses, Critical Issues, Key Integration Activities, and a ''quick list'' of Upcoming Key Events. Section B of this report, the Site Summary section, provides Environmental Management performance data specifically organized to the pertinent Critical Success Factors and Success Indicators, and Science and Technology data in the context of the Critical Outcomes. The Site Summary demonstrates the various missions' overall progress against these strategic objectives. The information is presented in both narrative and graphical formats. The remaining sections provide performance data relative to each individual mission area (e.g., Waste Management, Spent Nuclear Fuels, etc.). The information provided in the Mission Area sections is at a level of greater detail than is presented in either the Executive Summary or

  16. Hanford Site Performance Report - April 1999

    International Nuclear Information System (INIS)

    EDER, D.M.

    2001-01-01

    The purpose of the Hanford Site Performance Report is to provide the Department of Energy Richland Operations Office's (DOE-RL's) report of Hanford's performance by: U.S. Department of Energy, Richland Operations Office, Project Hanford Management Contract (PHMC) through Fluor Daniel Hanford, Inc. (FDH) and its subcontractors, Environmental Restoration Contract through Bechtel Hanford, Inc. (BHI), and its subcontractors, and Pacific Northwest National Laboratories (PNNL) for Science and Technology (S and T) Mission and support to the Environmental Management (EM). This report is published monthly with the intent of relating work performance and progress in the context of the Success Indicators and Critical Success Factors as outlined in the Hanford Strategic Plan. On a quarterly basis, the report also addresses performance and progress related to the Science and Technology Mission's Critical Outcomes as derived from the Hanford Strategic Plan. Section A of this report is the Executive Summary, encapsulating high-level data in this report into an overall brief. Summary information provided includes Notable Accomplishments, a performance profile with associated analyses, Critical Issues, Key Integration Activities, and a ''quick list'' of Upcoming Key Events. Section B of this report, the Site Summary section, provides Environmental Management performance data specifically organized to the pertinent Critical Success Factors and Success Indicators, and Science and Technology data in the context of the Critical Outcomes. The Site Summary demonstrates the various missions' overall progress against these strategic objectives. The information is presented in both narrative and graphical formats. The remaining sections provide performance data relative to each individual mission area (e.g., Waste Management, Spent Nuclear Fuels, etc.). The information provided in the Mission Area sections is at a level of greater detail than is presented in either the Executive Summary or

  17. Hanford Patrol Academy demolition sites closure plan

    Energy Technology Data Exchange (ETDEWEB)

    1993-09-30

    The Hanford Site is owned by the U.S. Government and operated by the U.S. Department of Energy, Richland Operations Office. Westinghouse Hanford Company is a major contractor to the U.S. Department of Energy, Richland Operations Office and serves as co-operator of the Hanford Patrol Academy Demolition Sites, the unit addressed in this paper. This document consists of a Hanford Facility Dangerous Waste Part A Permit Application, Form 3 (Revision 4), and a closure plan for the site. An explanation of the Part A Form 3 submitted with this closure plan is provided at the beginning of the Part A section. This Hanford Patrol Academy Demolition Sites Closure Plan submittal contains information current as of December 15, 1994.

  18. Characteristics of low-level radioactive waste disposed during 1987--1989

    International Nuclear Information System (INIS)

    Roles, G.W.

    1990-12-01

    This report presents the volume, activity, and radionuclide distributions in low-level radioactive waste (LLW) disposed during 1987 through 1989 at the commercial disposal facilities located near Barnwell, SC, Richland, WA, and Beatty, NV. The report has been entirely assembled from descriptions of waste provided in LLW shipment manifests. Individual radionuclide distributions are listed as a function of waste class, of general industry, and of waste stream. In addition, information is presented about disposal of wastes containing chelating agents, about use of solidification media, about the distribution of radiation levels at the surfaces of waste containers, and about the distribution of waste container sizes. Considerably more information is presented about waste disposed at the Richland and Beatty disposal facilities than at the Barnwell disposal facility

  19. Waste Analysis Plan for the Waste Receiving and Processing (WRAP) Facility

    International Nuclear Information System (INIS)

    TRINER, G.C.

    1999-01-01

    The purpose of this waste analysis plan (WAP) is to document the waste acceptance process, sampling methodologies, analytical techniques, and overall processes that are undertaken for dangerous, mixed, and radioactive waste accepted for confirmation, nondestructive examination (NDE) and nondestructive assay (NDA), repackaging, certification, and/or storage at the Waste Receiving and Processing Facility (WRAP). Mixed and/or radioactive waste is treated at WRAP. WRAP is located in the 200 West Area of the Hanford Facility, Richland, Washington. Because dangerous waste does not include source, special nuclear, and by-product material components of mixed waste, radionuclides are not within the scope of this documentation. The information on radionuclides is provided only for general knowledge

  20. Gravity studies of the Hanford Reservation, Richland, Washington

    International Nuclear Information System (INIS)

    Richard, B.H.; Lillie, J.T.; Deju, R.A.

    1977-07-01

    Gravity studies over Hanford added to the understanding of the geology of the Pasco Basin. The Bouguer anomaly indicated the basin is the site of the greatest thickness of Columbia River Basalt. The residual gravity anomaly delineated the major anticlinal and synclinal structures under Hanford. Three-dimensional gravity models characterized these buried folds by indicating their shape and relief. Finally, two-dimensional gravity models further delineated the shape of these buried folds and suggested locations where ancestral rivers may have breached the Umtanum anticlinal folds within the basin. Analysis of the three-dimensional model studies indicates that one-fifth of the original data would have delineated the buried structures. Two- or three-body gravity models produced better results than a poly-body model. Gravity was found to be an effective and rapid reconnaissance method of studying buried bedrock structures

  1. Green Richland: Building Sustainable Local and World Community

    Science.gov (United States)

    Lester, Carole N.

    2008-01-01

    This article shares the college's experiences and the lessons learned in the creation of the GREENRichland Program and the other approaches to building sustainability. These programs directly support the college's vision to be the best place to learn, teach, and build sustainable local and world community. This discussion features details…

  2. Evaluation of Modeled and Measured Energy Savings in Existing All Electric Public Housing in the Pacific Northwest

    Energy Technology Data Exchange (ETDEWEB)

    Gordon, Andrew [Building America Partnership for Improved Residential Construction (BA-PIRC), Cocoa, FL (United States); Lubliner, Michael [Building America Partnership for Improved Residential Construction (BA-PIRC), Cocoa, FL (United States); Howard, Luke [Building America Partnership for Improved Residential Construction (BA-PIRC), Cocoa, FL (United States); Kunkle, Rick [Building America Partnership for Improved Residential Construction (BA-PIRC), Cocoa, FL (United States); Salzberg, Emily [Building America Partnership for Improved Residential Construction (BA-PIRC), Cocoa, FL (United States)

    2014-04-01

    This project analyzes the cost effectiveness of energy savings measures installed by a large public housing authority in Salishan, a community in Tacoma Washington. Research focuses on the modeled and measured energy usage of the first six phases of construction, and compares the energy usage of those phases to phase 7. Market-ready energy solutions were also evaluated to improve the efficiency of affordable housing for new and existing (built since 2001) affordable housing in the marine climate of Washington State.

  3. ARROW (Version 2) Commercial Software Validation and Configuration Control

    Energy Technology Data Exchange (ETDEWEB)

    HEARD, F.J.

    2000-02-10

    ARROW (Version 2), a compressible flow piping network modeling and analysis computer program from Applied Flow Technology, was installed for use at the U.S. Department of Energy Hanford Site near Richland, Washington.

  4. ARROW (Version 2) Commercial Software Validation and Configuration Control

    International Nuclear Information System (INIS)

    HEARD, F.J.

    2000-01-01

    ARROW (Version 2), a compressible flow piping network modeling and analysis computer program from Applied Flow Technology, was installed for use at the U.S. Department of Energy Hanford Site near Richland, Washington

  5. Integrated environment, safety, and health management system description

    International Nuclear Information System (INIS)

    Zoghbi, J. G.

    2000-01-01

    The Integrated Environment, Safety, and Health Management System Description that is presented in this document describes the approach and management systems used to address integrated safety management within the Richland Environmental Restoration Project

  6. Constituent concentrations, loads, and yields to Beaver Lake, Arkansas, water years 1999-2008

    Science.gov (United States)

    Bolyard, Susan E.; De Lanois, Jeanne L.; Green, W. Reed

    2010-01-01

    Beaver Lake is a large, deep-storage reservoir used as a drinking-water supply and considered a primary watershed of concern in the State of Arkansas. As such, information is needed to assess water quality, especially nutrient enrichment, nutrient-algal relations, turbidity, and sediment issues within the reservoir system. Water-quality samples were collected at three main inflows to Beaver Lake: the White River near Fayetteville, Richland Creek at Goshen, and War Eagle Creek near Hindsville. Water-quality samples collected over the period represented different flow conditions (from low to high). Constituent concentrations, flow-weighted concentrations, loads, and yields from White River, Richland Creek, and War Eagle Creek to Beaver Lake for water years 1999-2008 were documented for this report. Constituents include total ammonia plus organic nitrogen, dissolved nitrite plus nitrate nitrogen, dissolved orthophosphorus (soluble reactive phosphorus), total phosphorus, total nitrogen, dissolved organic carbon, total organic carbon, and suspended sediment. Linear regression models developed by computer program S-LOADEST were used to estimate loads for each constituent for the 10-year period at each station. Constituent yields and flow-weighted concentrations for each of the three stations were calculated for the study. Constituent concentrations and loads and yields varied with time and varied among the three tributaries contributing to Beaver Lake. These differences can result from differences in precipitation, land use, contributions of nutrients from point sources, and variations in basin size. Load and yield estimates varied yearly during the study period, water years 1999-2008, with the least nutrient and sediment load and yields generally occurring in water year 2006, and the greatest occurring in water year 2008, during a year with record amounts of precipitation. Flow-weighted concentrations of most constituents were greatest at War Eagle Creek near Hindsville

  7. Safe interim storage of Hanford tank wastes, draft environmental impact statement, Hanford Site, Richland, Washington

    Energy Technology Data Exchange (ETDEWEB)

    1994-07-01

    This Draft EIS is prepared pursuant to the National Environmental Policy Act (NEPA) and the Washington State Environmental Policy Act (SEPA). DOE and Ecology have identified the need to resolve near-term tank safety issues associated with Watchlist tanks as identified pursuant to Public Law (P.L.) 101-510, Section 3137, ``Safety Measures for Waste Tanks at Hanford Nuclear Reservation,`` of the National Defense Authorization Act for Fiscal Year 1991, while continuing to provide safe storage for other Hanford wastes. This would be an interim action pending other actions that could be taken to convert waste to a more stable form based on decisions resulting from the Tank Waste Remediation System (TWRS) EIS. The purpose for this action is to resolve safety issues concerning the generation of unacceptable levels of hydrogen in two Watchlist tanks, 101-SY and 103-SY. Retrieving waste in dilute form from Tanks 101-SY and 103-SY, hydrogen-generating Watchlist double shell tanks (DSTs) in the 200 West Area, and storage in new tanks is the preferred alternative for resolution of the hydrogen safety issues.

  8. Safe interim storage of Hanford tank wastes, draft environmental impact statement, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1994-07-01

    This Draft EIS is prepared pursuant to the National Environmental Policy Act (NEPA) and the Washington State Environmental Policy Act (SEPA). DOE and Ecology have identified the need to resolve near-term tank safety issues associated with Watchlist tanks as identified pursuant to Public Law (P.L.) 101-510, Section 3137, ''Safety Measures for Waste Tanks at Hanford Nuclear Reservation,'' of the National Defense Authorization Act for Fiscal Year 1991, while continuing to provide safe storage for other Hanford wastes. This would be an interim action pending other actions that could be taken to convert waste to a more stable form based on decisions resulting from the Tank Waste Remediation System (TWRS) EIS. The purpose for this action is to resolve safety issues concerning the generation of unacceptable levels of hydrogen in two Watchlist tanks, 101-SY and 103-SY. Retrieving waste in dilute form from Tanks 101-SY and 103-SY, hydrogen-generating Watchlist double shell tanks (DSTs) in the 200 West Area, and storage in new tanks is the preferred alternative for resolution of the hydrogen safety issues

  9. Fluor Hanford Project Focused Progress at Hanford

    International Nuclear Information System (INIS)

    HANSON, R.D.

    2000-01-01

    Fluor Hanford is making significant progress in accelerating cleanup at the Hanford site. This progress consistently aligns with a new strategic vision established by the U.S. Department of Energy's Richland Operations Office (RL)

  10. Subsurface barrier feasibility evaluation: External review meeting report

    International Nuclear Information System (INIS)

    Lindberg, S.L.; Rouse, J.K.

    1994-12-01

    The Westinghouse Hanford Company -- Tank Waste Remediation System Division (TWRS) Program is evaluating subsurface barrier technologies for potential use in supporting remediation of the Hanford Tank Farms for the US Department of Energy, Richland Operations Office (DOE-RL). An External Review Team (ERT) was assembled to perform an independent technical review of the work performed to-date supporting the evaluation process. A set of draft documents was forwarded to the ERT for their review, and a meeting was held August 10 through 12, 1994, to facilitate comments and resolutions. This document summarizes the meeting, the comments provided by the ERT, and the ongoing work to resolve the comments and support a pending decision by The US Department of Energy, Richland Operations Office; the Washington State Department of Ecology; and the US Environmental Protection Agency

  11. Introduction to Exxon nuclear fuel fabrication plant

    International Nuclear Information System (INIS)

    Schneider, R.A.

    1985-01-01

    The Exxon Nuclear low-enriched uranium fuel fabrication plant in Richland, Washington produces fuel assemblies for both pressurized water and boiling water reactors. The Richland plant was the first US bulk-handling facility selected by the IAEA for inspection under the US-IAEA Safeguards Agreement. The plant was under IAEA inspection from March 1981 through October 1983. This text provides a written description of the plant layout, operation and process. The text also includes a one ton-a-day model (or reference) plant which was adapted from the Exxon Nuclear plant. The Model Plant provides a generic example of a low-enriched uranium (LEU) bulk-handling facility. The Model Plant is used to illustrate in a more quantitative way some of the key safeguards requirements for a bulk-handling facility

  12. Engineering evaluation/cost analysis for the 233-S Plutonium Concentration Facility

    International Nuclear Information System (INIS)

    Rugg, J.E.

    1996-08-01

    The 100, 200, 300 and 1100 Areas of the Hanford Site were placed on the U. S. Environmental Protection Agency's National Priorities List in November 1989 under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). Located in the 200 Area is the deactivated 233-S Plutonium Concentration Facility (used in the REDOX process). The facility has undergone severe degradation due to exposure to extreme weather conditions. An expedited response is proposed to ensure protection of human health and the environment. The Department of Energy, Richland Operations Office (RL) in cooperation with the Washington State Department of Ecology, has prepared this Engineering Evaluation/Cost Analysis pursuant to CERCLA. Based on the evaluation, RL has determined that hazardous substances in the 233-S Facility may present a potential threat to human health or the environment, and that an expedited removal action is warranted for decommissioning of the facility

  13. Annual Status Report (FY2008) Composite Analysis of Low-Level Waste Disposal in the Central Plateau at the Hanford Site

    Energy Technology Data Exchange (ETDEWEB)

    Nichols, W. E. [Hanford Site (HNF), Richland, WA (United States)

    2009-12-18

    In accordance with the U.S. Department of Energy (DOE) requirements in DOE 0 435.1, Radioactive to be considered or purposes of Waste Management, and implemented by DOE/RL-2000-292, Maintenance Plan for the Composite Analysis of the Hanford Site, Southeast Washington, the DOE Richland Operations Office has prepared this annual report for fiscal year 2008 of PNNL-1 1800, Composite Analysis for the Low-Level Waste Disposal in the 200-Area Plateau of the Hanford Site, hereafter referred to as the Composite Analysis. The main emphasis of DOE/RL-2000-29 Is to identify additional data and information to enhance the Composite Analysis and the subsequent PNNL- 11800 Addendum, Addendum to Composite Analysis for Low-Level Waste Disposal in the 200 Area Plateau of the Hanford Site, hereafter referred to as the Addendum, and to address secondary issues identified during the review of the Composite Analysis.

  14. Polyethylene liners in radioactive mixed waste packages: An engineering study

    International Nuclear Information System (INIS)

    Whitney, G.A.

    1991-05-01

    Westinghouse Hanford Company manages and operates the Hanford Site 200 Area radioactive solid waste treatment, storage, and disposal facilities for the US Department of Energy-Richland Operations Office under contract AC06-87RL10930. These facilities include solid waste disposal sites and radioactive solid waste storage areas. This document is 1 in a series of 25 reports or actions identified in a Solid Waste Management Event Fact Sheet and critique report (Appendix E) to address the problem of stored, leaking 183-H Solar Evaporation Basin waste drums. It specifically addresses the adequacy of polyethylene liners used as internal packaging of radioactive mixed waste. This document is to be used by solid waste generators preparing solid waste for storage at Hanford Site facilities. This document is also intended for use by Westinghouse Hanford Company solid waste technical staff involved with approval and acceptance of radioactive solid waste

  15. Final report for the 190-D complex decontamination and decommissioning

    International Nuclear Information System (INIS)

    Thoren, S.D.

    1996-09-01

    This report documents the decontamination and decommissioning (D ampersand D) of the 190-D complex. (located on the Hanford Site in Richland, Washington). D ampersand D of the 190-D complex included decontaminating and removing hazardous and radiologically contaminated materials; dismantling equipment piping and utility infrastructure; demolishing the structure; and restoring the site. The 100-D Area contains two of the nine inactive plutonium production reactors. The reactor sites are located along the south shore of the Columbia River where the sites cover the northern part of the Hanford Site. The 190-D complex is located in the 100-D Area and is composed of the following seven buildings: 185-D De-aeration Building, 189-D Refrigeration Building, 190-D Tank Room Highbay, 190-D Process Pump Room, 190-DA Process Pump Room Annex, 195-D Vertical Safety Rod Test Tower, 1724-D Underwater Test Facility

  16. In situ radiological characterization to support a test excavation at a liquid waste disposal site

    International Nuclear Information System (INIS)

    Keele, B.D.; Bauer, R.G.; Blewett, G.R.; Troyer, G.L.

    1994-05-01

    An in situ radiological detection system was developed to support a small test excavation at a liquid waste disposal site at the Hanford Site in Richland, Washington. Instrumentation, calibration and comparisons to samples are discussed

  17. Flow area optimization in point to area or area to point flows

    International Nuclear Information System (INIS)

    Ghodoossi, Lotfollah; Egrican, Niluefer

    2003-01-01

    This paper deals with the constructal theory of generation of shape and structure in flow systems connecting one point to a finite size area. The flow direction may be either from the point to the area or the area to the point. The formulation of the problem remains the same if the flow direction is reversed. Two models are used in optimization of the point to area or area to point flow problem: cost minimization and revenue maximization. The cost minimization model enables one to predict the shape of the optimized flow areas, but the geometric sizes of the flow areas are not predictable. That is, as an example, if the area of flow is a rectangle with a fixed area size, optimization of the point to area or area to point flow problem by using the cost minimization model will only predict the height/length ratio of the rectangle not the height and length itself. By using the revenue maximization model in optimization of the flow problems, all optimized geometric aspects of the interested flow areas will be derived as well. The aim of this paper is to optimize the point to area or area to point flow problems in various elemental flow area shapes and various structures of the flow system (various combinations of elemental flow areas) by using the revenue maximization model. The elemental flow area shapes used in this paper are either rectangular or triangular. The forms of the flow area structure, made up of an assembly of optimized elemental flow areas to obtain bigger flow areas, are rectangle-in-rectangle, rectangle-in-triangle, triangle-in-triangle and triangle-in-rectangle. The global maximum revenue, revenue collected per unit flow area and the shape and sizes of each flow area structure have been derived in optimized conditions. The results for each flow area structure have been compared with the results of the other structures to determine the structure that provides better performance. The conclusion is that the rectangle-in-triangle flow area structure

  18. Ecological Characterization Data for the 2004 Composite Analysis

    Energy Technology Data Exchange (ETDEWEB)

    Downs, Janelle L.; Simmons, Mary A.; Stegen, Jennifer A.; Bunn, Amoret L.; Tiller, Brett L.; Thorsten, Susan L.; Zufelt, Rhett K.

    2004-11-01

    A composite analysis is required by U.S. Department of Energy (DOE) Order 435.1 to ensure public safety through the management of active and planned low-level radioactive waste disposal facilities associated with the Hanford Site. The original Hanford Site Composite Analysis of 1998 must be revised and submitted to DOE Headquarters (DOE-HQ) in 2004 because of revisions to waste site information in the 100, 200, and 300 Areas, updated performance assessments and environmental impact statements (EIS), changes in inventory estimates for key sites and constituents, and a change in the definition of offsite receptors. Beginning in fiscal year (FY) 2003, the DOE Richland Operations Office (DOE-RL) initiated activities, including the development of data packages, to support the 2004 Composite Analysis. This report describes the data compiled in FY 2003 to support ecological site assessment modeling for the 2004 Composite Analysis. This work was conducted as part of the Characterization of Systems Task of the Groundwater Remediation Project (formerly the Groundwater Protection Program) managed by Fluor Hanford, Inc., Richland, Washington. The purpose of this report is to provide summaries of the characterization information and available spatial data on the biological resources and ecological receptors found in the upland, riparian, aquatic, and island habitats on the Hanford Site. These data constitute the reference information used to establish parameters for the ecological risk assessment module of the System Assessment Capability and other assessment activities requiring information on the presence and distribution of biota on the Hanford Site.

  19. Ecological Characterization Data for the 2004 Composite Analysis

    International Nuclear Information System (INIS)

    Downs, Janelle L.; Simmons, Mary A.; Stegen, Amanda A.; Bunn, Amoret L.; Tiller, Brett L.; Thorsten, Susan L.; Zufelt, Rhett K.

    2004-01-01

    A composite analysis is required by U.S. Department of Energy (DOE) Order 435.1 to ensure public safety through the management of active and planned low-level radioactive waste disposal facilities associated with the Hanford Site. The original Hanford Site Composite Analysis of 1998 must be revised and submitted to DOE Headquarters (DOE-HQ) in 2004 because of revisions to waste site information in the 100, 200, and 300 Areas, updated performance assessments and environmental impact statements (EIS), changes in inventory estimates for key sites and constituents, and a change in the definition of offsite receptors. Beginning in fiscal year (FY) 2003, the DOE Richland Operations Office (DOE-RL) initiated activities, including the development of data packages, to support the 2004 Composite Analysis. This report describes the data compiled in FY 2003 to support ecological site assessment modeling for the 2004 Composite Analysis. This work was conducted as part of the Characterization of Systems Task of the Groundwater Remediation Project (formerly the Groundwater Protection Program) managed by Fluor Hanford, Inc., Richland, Washington. The purpose of this report is to provide/SUMmaries of the characterization information and available spatial data on the biological resources and ecological receptors found in the upland, riparian, aquatic, and island habitats on the Hanford Site. These data constitute the reference information used to establish parameters for the ecological risk assessment module of the System Assessment Capability and other assessment activities requiring information on the presence and distribution of biota on the Hanford Site

  20. Transition report, United States Department of Energy: A report to the President-Elect. Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    1988-11-01

    This report is a description of the Department of Energy organization and projects. The topics of the report include: (1) DOE organization and overview; (2) Headquarters Offices: Congressional, Intergovernmental and Public Affairs; Conservation and Renewable Energy; Contract Appeals; Defense Programs; Economic Regulatory Administration; Energy Information Administration; Energy Research; Environment, Safety and Health; Fossil Energy; General Counsel; Hearings and Appeals; Inspector General; International Affairs and Energy Emergencies; Management and Administration; Minority Economic Impact; New Production Reactors; Nuclear Energy; Policy, Planning and Analysis; Radioactive Waste Management; (3) Operations Offices: Albuquerque Operations Office; Chicago Operations Office; Idaho Operations Office; Nevada Operations Office; Oak Ridge Operations Office; Richland Operations Office; San Francisco Operations Office; Savannah River Operations Office; Laboratories; and (4) Power Administrations: Bonneville Power Administration; Western Area Power Administration.

  1. Investigation of the chemical explosion of an ion exchange resin column and resulting americium contamination of personnel in the 242-Z building, August 30, 1976

    Energy Technology Data Exchange (ETDEWEB)

    1976-10-19

    As a result of an explosion in the Waste Treatment Facility, 242-Z Building, 200 West Area of the Hanford Reservation on August 30, 1976, the Manager of the Richland Operations Office (RL), Energy Research and Development Administration (ERDA), appointed an ERDA Committee to conduct a formal investigation and to prepare a report on their findings of this occurrence. The Committee was instructed to conduct the investigation in accordance with ERDAMC 0502, insofar as circumstances would permit, to cover and explain technical elements of the casual sequence(s) of the occurrence, and to describe management systems which should have or could have prevented the occurrence. This report is the result of the investigation and presents the conclusions of the review.

  2. Waste analysis plan for the low-level burial grounds. Revision 2

    International Nuclear Information System (INIS)

    Pratt, D.A.

    1997-01-01

    The purpose of this waste analysis plan (WAP) is to document the waste 5 acceptance process, sampling methodologies, analytical techniques, and overall 6 processes that are undertaken for waste accepted for disposal at the Low-Level 7 Burial Grounds (LLBG), which are located in the 200 East and 200 West Areas of 8 the Hanford Facility, Richland, Washington. Because dangerous waste does not 9 include the source, special nuclear, and by-product material components of 10 mixed waste, radionuclides are not within the scope of this documentation. 11 The information on radionuclides is provided only for general knowledge. The 12 LLBG also receive low-level radioactive waste for disposal. The requirements 13 of this WAP are not applicable to this low-level waste

  3. Environmental Management Performance Report April 2000

    Energy Technology Data Exchange (ETDEWEB)

    EDER, D.M.

    2000-04-01

    The purpose of the Environmental Management Performance Report (EMPR) is to provide the Department of Energy Richland Operations Office's (DOE-RL's) report of Hanford's Environmental Management (EM) performance by: Project Hanford Management Contract (PHMC) through Fluor Hanford, Inc. (FHI) and its subcontractors; Environmental Restoration Contract through Bechtel Hanford, Inc. (BHI), and its subcontractors; Pacific Northwest National Laboratories (PNNL) for EM and EM Science and Technology (S and T) Mission; and Office of Safety Regulation of the TWRS Privatization Contractor. This report is a monthly publication that summarizes EM Site performance under RL Operations Office. It is organized by the four sections listed above, with each section containing an Executive Summary and Area Performance Summaries.

  4. Hanford radiological protection support services annual report for 1987

    International Nuclear Information System (INIS)

    Lyon, M.; Fix, J.J.; Kenoyer, J.L.; Leonowich, J.A.; Palmer, H.E.; Sula, M.J.

    1988-08-01

    This report documents the performance of certain radiological protection sitewide services during calendar year (CY) 1987 by Pacific Northwest Laboratory in support of the US Department of Energy-Richland Operations Office (DOE-RL) and contractor activities on the Hanford Site. The routine program for each service is discussed along with any significant program changes and tasks, investigations, and studies performed in support of each program. Other related activities such as publications, presentations, and memberships on standards or industry committees are also discussed. The programs covered provide services in the areas of: external dosimetry, internal dosimetry, in vivo measurements, instrument calibration and evaluation, calibration of radiation sources traceable to the National Bureau of Standards, and radiological records. 21 refs., 10 figs., 12 tabs

  5. NPDES Permit for Dakota Magic Casino Wastewater Treatment Facility in North Dakota

    Science.gov (United States)

    Under NPDES permit ND-0030813, the Dakota Nation Gaming Enterprise is authorized to discharge from the wastewater treatment facility in Richland County, North Dakota, to a roadside ditch flowing to an unnamed tributary to the Bois de Sioux.

  6. Bioavailability and impact of effluents on coastal ecosystems

    International Nuclear Information System (INIS)

    Anon.

    1976-01-01

    The Bioavailability and Impact of Effluents on Coastal Ecosystems program was initiated in July 1974. The program's major objective was to bring together a multidisciplinary team of researchers to investigate the biogeochemical processes that control the transport, transfer, distribution, biological availability and toxicity of materials found in energy-related effluents. This year has been spent in planning the needed research tasks, assembling the necessary personnel and equipment, and initiating first stage research as defined by the program. The program is centered at the Marine Research Laboratory, Sequim, Washington, and involves scientists located at Sequim and Richland. The operating philosophy is to conduct the program at the Marine Research Laboratory and use equipment and expertise from Richland as a resource for studies that cannot be practically done at Sequim. The research described represents the first year's efforts by the investigators involved in the program

  7. 200 West Ash Pit Demolition Site closure plan

    International Nuclear Information System (INIS)

    1992-11-01

    The Hanford Facility is owned by the US Government and operated by the US Department of Energy, Richland Field Office. Dangerous waste and mixed waste (containing both radioactive and dangerous components) are managed and produced on the Hanford Facility. Westinghouse Hanford Company is a major contractor to the US Department of Energy, Richland Field Office and serves as cooperator of the 200 West Ash Pit Demolition Site, the unit addressed in this closure plan. The 200 West Ash Pit Demolition Site Closure Plan consists of a Part A Permit Application (Revision 3) and a closure plan. An explanation of the Part A Permit Application revision is provided at the beginning of the Part A section. The closure plan consists of nine chapters and three appendices. This 200 West Ash Pit Demolition Site Closure Plan submittal contains information current as of October 15, 1992

  8. Risk management study for the retired Hanford Site facilities: Risk management executive summary

    International Nuclear Information System (INIS)

    Coles, G.A.; Shultz, M.V.; Taylor, W.E.

    1994-02-01

    This document provides a cost-comparison evaluation for implementing certain risk-reduction measures and their effect on the overall risk of the 100 and 200 Area retired, surplus facilities. The evaluation is based on conditions that existed at the time the risk evaluation team performed facility investigations, and does not acknowledge risk-reduction measures that occurred soon after risk identification. This evaluation is one part of an overall risk management study for these facilities. The retired facilities investigated for this evaluation are located in the 100 and 200 Areas of the 1450-km 2 Hanford Site. The Hanford Site is a semiarid tract of land in southeastern Washington State. The nearest population center is Richland, Washington, (population 32,000) 30 km southeast of the 200 Area. This document is the first in a four volume series that comprise the risk management study for the retired, surplus facilities. Volume 2 is the risk evaluation work procedure; volume 3 provides the results for the risk evaluation; and volume 4 is the risk-reduction cost comparison

  9. 30-MJ SMES system operating experience: November 1982-June 1983

    International Nuclear Information System (INIS)

    Schermer, R.I.

    1983-01-01

    This paper describes performance measurements on the dewar, coil, and cryogenic system for the 30-MJ superconducting magnetic energy storage (SMES) unit that has recently been tested at a Bonneville Power Administration substation in Tacoma, Washington. The cryostat, the world's largest fiber-reinforced plastic, open-mouthed dewar, boils off 12 l/h in accordance with previous calculations. Cyclic losses in the coil, 54 W for +-8.4-MW modulation at 1 Hz, are approximately 50% greater than calculated. Refrigerator capacity is adequate to handle the heat produced by the average modulation demand on the coil

  10. Impossible body.

    Science.gov (United States)

    Lusero, L

    1999-01-01

    SUMMARY This play tells the story of one woman coming to terms with her "poly" identity through a journey into the multiple layers of love, race, sex, appearance and Otherness. The one-woman show Impossible Body was first performed for a reading series sponsored by "Onstage" at the University of Colorado, Boulder, in February 1997. A revised version was developed and staged at the University of Puget Sound in Tacoma, Washington in April 1997. The current script, from which these excerpts are taken, was first presented at the Queer Studies Conference in Boulder, Colorado.

  11. Exploratory Use of Microaerosol Decontamination Technology (PAEROSOL) in Enclosed, Unoccupied Hospital Setting

    Energy Technology Data Exchange (ETDEWEB)

    Rainina, Evguenia I.; McCune, D. E.; Luna, Maria L.; Cook, J. E.; Soltis, Michele A.; Demons, Samandra T.; Godoy-Kain, Patricia; Weston, J. H.

    2012-05-31

    The goal of this study was to validate the previously observed high biological kill performance of PAEROSOL, a semi-dry, micro-aerosol decontamination technology, against common HAI in a non-human subject trial within a hospital setting of Madigan Army Medical Center (MAMC) on Joint Base Lewis-McChord in Tacoma, Washington. In addition to validating the disinfecting efficacy of PAEROSOL, the objectives of the trial included a demonstration of PAEROSOL environmental safety, (i.e., impact to hospital interior materials and electronic equipment exposed during testing) and PAEROSOL parameters optimization for future deployment.

  12. Evaluation of Savings in Energy-Efficient Public Housing in the Pacific Northwest

    Energy Technology Data Exchange (ETDEWEB)

    Gordon, A. [Building America Partnership for Improved Residential Construction (BA-PIRC), Cocoa, FL (United States); Lubliner, M. [Building America Partnership for Improved Residential Construction (BA-PIRC), Cocoa, FL (United States); Howard, L. [Building America Partnership for Improved Residential Construction (BA-PIRC), Cocoa, FL (United States); Kunkle, R. [Building America Partnership for Improved Residential Construction (BA-PIRC), Cocoa, FL (United States)

    2013-10-01

    This report presents the results of an energy performance and cost-effectiveness analysis. The Salishan phase 7 and demonstration homes were compared to Salishan phase 6 homes built to 2006 Washington State Energy Code specifications 2. Predicted annual energy savings (over Salishan phase 6) was 19% for Salishan phase 7, and between 19-24% for the demonstration homes (depending on ventilation strategy). Approximately two-thirds of the savings are attributable to the DHP. Working with the electric utility provider, Tacoma Public Utilities, researchers conducted a billing analysis for Salishan phase 7.

  13. Disaster recovery plan for Automation Technology

    International Nuclear Information System (INIS)

    Owens, M.J.

    1997-06-01

    Automation Technology provides a multitude of data processing and network services to the Environmental Restoration Contract (ERC). These services include: personal computers, local and wide area networks, and Internet and intranet support and services. ERC employees and client personnel receive these services primarily from the Data Center located on the ground floor in the Bechtel Corporate Center at 3350 George Washington Way, Richland, Washington. Centralized databases, server-based software, and network services for the Bechtel Local Area Network reside on servers located in the Data Center. The data communication circuits supported in this center allow for the transmission of business information to and from all project locations in the Hanford Site complex. The loss of one or more of these functions would seriously impact the ability of the ERC to conduct business and bring a virtual standstill to many ERC employees'' activities. Upon declaration of disaster by the Contingency Manager and the Disaster Recovery Coordinator, the disaster recovery plan will be implemented. 24 tabs

  14. Hanford Site Wide Transportation Safety Document [SEC 1 Thru 3

    Energy Technology Data Exchange (ETDEWEB)

    MCCALL, D L

    2002-06-01

    This safety evaluation report (SER) documents the basis for the US Department of Energy (DOE), Richland Operations Office (RL) to approve the Hanford Sitewide Transportation Safety Document (TSD) for onsite Transportation and Packaging (T&P) at Hanford. Hanford contractors, on behalf of DOE-RL, prepared and submitted the Hanford Sitewide Transportation Safety Document, DOE/RL-2001-0036, Revision 0, (DOE/RL 2001), dated October 4, 2001, which is referred to throughout this report as the TSD. In the context of the TSD, Hanford onsite shipments are the activities of moving hazardous materials, substances, and wastes between DOE facilities and over roadways where public access is controlled or restricted and includes intra-area and inter-area movements. The TSD sets forth requirements and standards for onsite shipment of radioactive and hazardous materials and wastes within the confines of the Hanford Site on roadways where public access is restricted by signs, barricades, fences, or other means including road closures and moving convoys controlled by Hanford Site security forces.

  15. Spatially variable stage-driven groundwater-surface water interaction inferred from time-frequency analysis of distributed temperature sensing data

    Science.gov (United States)

    Mwakanyamale, Kisa; Slater, Lee; Day-Lewis, Frederick D.; Elwaseif, Mehrez; Johnson, Carole D.

    2012-01-01

    Characterization of groundwater-surface water exchange is essential for improving understanding of contaminant transport between aquifers and rivers. Fiber-optic distributed temperature sensing (FODTS) provides rich spatiotemporal datasets for quantitative and qualitative analysis of groundwater-surface water exchange. We demonstrate how time-frequency analysis of FODTS and synchronous river stage time series from the Columbia River adjacent to the Hanford 300-Area, Richland, Washington, provides spatial information on the strength of stage-driven exchange of uranium contaminated groundwater in response to subsurface heterogeneity. Although used in previous studies, the stage-temperature correlation coefficient proved an unreliable indicator of the stage-driven forcing on groundwater discharge in the presence of other factors influencing river water temperature. In contrast, S-transform analysis of the stage and FODTS data definitively identifies the spatial distribution of discharge zones and provided information on the dominant forcing periods (≥2 d) of the complex dam operations driving stage fluctuations and hence groundwater-surface water exchange at the 300-Area.

  16. Environmental Management Performance Report July 2000

    Energy Technology Data Exchange (ETDEWEB)

    EDER, D.M.

    2000-07-01

    The purpose of this report is to provide the Department of Energy Richland Operations Office (DOE-RL) a monthly summary of the Project Hanford Management Contractor's (PHMC) Environmental Management (EM) performance by Fluor Hanford (FH) and its subcont.

  17. FFTF Authorization Agreement

    International Nuclear Information System (INIS)

    DAUTEL, W.A.

    2000-01-01

    The purpose of the Authorization Agreement is to serve as a mechanism whereby the U.S. Department of Energy, Richland Operations Office (RL) and Fluor Hanford (FH) jointly clarify and agree to key conditions for conducting work safely and efficiently

  18. Environmental assessment: Transfer of normal and low-enriched uranium billets to the United Kingdom, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1995-11-01

    Under the auspices of an agreement between the U.S. and the United Kingdom, the U.S. Department of Energy (DOE) has an opportunity to transfer approximately 710,000 kilograms (1,562,000 pounds) of unneeded normal and low-enriched uranium (LEU) to the United Kingdom; thus, reducing long-term surveillance and maintenance burdens at the Hanford Site. The material, in the form of billets, is controlled by DOE's Defense Programs, and is presently stored as surplus material in the 300 Area of the Hanford Site. The United Kingdom has expressed a need for the billets. The surplus uranium billets are currently stored in wooden shipping containers in secured facilities in the 300 Area at the Hanford Site (the 303-B and 303-G storage facilities). There are 482 billets at an enrichment level (based on uranium-235 content) of 0.71 weight-percent. This enrichment level is normal uranium; that is, uranium having 0.711 as the percentage by weight of uranium-235 as occurring in nature. There are 3,242 billets at an enrichment level of 0.95 weight-percent (i.e., low-enriched uranium). This inventory represents a total of approximately 532 curies. The facilities are routinely monitored. The dose rate on contact of a uranium billet is approximately 8 millirem per hour. The dose rate on contact of a wooden shipping container containing 4 billets is approximately 4 millirem per hour. The dose rate at the exterior of the storage facilities is indistinguishable from background levels

  19. Hydrogeology along the southern boundary of the Hanford Site between the Yakima and Columbia Rivers, Washington

    International Nuclear Information System (INIS)

    Liikala, T.L.

    1994-09-01

    US Department of Energy (DOE) operations at the Hanford Site, located in southeastern Washington, have generated large volumes of hazardous and radioactive wastes since 1944. Some of the hazardous wastes were discharged to the ground in the 1100 and 3000 Areas, near the city of Richland. The specific waste types and quantities are unknown; however, they probably include battery acid, antifreeze, hydraulic fluids, waste oils, solvents, degreasers, paints, and paint thinners. Between the Yakima and Columbia rivers in support of future hazardous waste site investigations and ground-water and land-use management. The specific objectives were to collect and review existing hydrogeologic data for the study area and establish a water-level monitoring network; describe the regional and study area hydrogeology; develop a hydrogeologic conceptual model of the unconfined ground-water flow system beneath the study area, based on available data; describe the flow characteristics of the unconfined aquifer based on the spatial and temporal distribution of hydraulic head within the aquifer; use the results of this study to delineate additional data needs in support of future Remedial Investigation/Feasibility Studies (RI/FS), Fate and Transport modeling, Baseline Risk Assessments (BRA), and ground-water and land-use management

  20. Spent nuclear fuel project-criteria document Cold Vacuum Drying Facility phase 2 safety analysis report

    International Nuclear Information System (INIS)

    Garvin, L.J.

    1998-01-01

    The criteria document provides the criteria and guidance for developing the SNF CVDF Phase 2 SAR. This SAR will support the US Department of Energy, Richland Operations Office decision to authorize the procurement, installation, and installation acceptance testing of the CVDF systems

  1. Hanford emergency management plan - release 15

    Energy Technology Data Exchange (ETDEWEB)

    CARPENTER, G.A.

    1999-07-19

    The Hanford emergency management plan for the US Department of Energy Richland, WA and Office of River Protection. The program was developed in accordance with DOE Orders as well as Federal and State regulations to protect workers and public health and safety.

  2. The 324 building radiochemical engineering scales and high-level vault cells plan

    International Nuclear Information System (INIS)

    Prignano, A.L.

    1997-01-01

    This closure plan incorporates the requirements and decisions made during a Data Quality Objectives process held in 1996 by the State of Washington Department of Ecology, US Department of Energy Richland Operations Office, and contractors associated with closure of the 324 Building

  3. Hanford emergency management plan - release 15

    International Nuclear Information System (INIS)

    CARPENTER, G.A.

    1999-01-01

    The Hanford emergency management plan for the US Department of Energy Richland, WA and Office of River Protection. The program was developed in accordance with DOE Orders as well as Federal and State regulations to protect workers and public health and safety

  4. Emergency preparedness 1995 site support plan WBS 6.7.2.3

    International Nuclear Information System (INIS)

    Faulk, S.M.

    1994-09-01

    The Emergency Preparedness Program provides an emergency management system including occurrence notification; development, coordination, and direction of planning, preparedness, and readiness assurance for response to emergency events on the Hanford Site; and emergency management support to Department of Energy, Richland Operations Office (RL)

  5. Annual Status Report (FY2015) Composite Analysis for Low Level Waste Disposal in the Central Plateau of the Hanford Site

    Energy Technology Data Exchange (ETDEWEB)

    Nichols, W. E. [CH2M Hill Plateau Remediation Company, Richland, WA (United States)

    2016-03-24

    In accordance with U.S. Department of Energy (DOE) requirements in DOE O 435.1, and as implemented by DOE/RL-2000-29, the DOE Richland Operations Office has prepared this annual summary of the Hanford Site Composite Analysis for fiscal year 2015.

  6. Annual Status Report (FY2104) Composite Analysis of Low Level Waste Disposal in the Central Plateau at the Hanford Site

    Energy Technology Data Exchange (ETDEWEB)

    Nichols, W. E. [CH2M Hill Plateau Remediation Company, Richland, WA (United States)

    2015-03-24

    In accordance with U.S. Department of Energy requirements in DOE O 435.1 and as implemented by DOE/RL-2009-29, the DOE Richland Operations Office has prepared this annul summary of the Hanford Site Composite Analysis for fiscal year 2014.

  7. Can't this train go somewhere else?

    International Nuclear Information System (INIS)

    Bushee, Tom

    1992-01-01

    The author discusses public relations/public affairs challenges encountered in shipping a decommissioned reactor vessel from Sioux Falls, S.D. to Richland, Wa. and some of the measures his company took to assure completion of the shipment in a timely manner. (author)

  8. Annual Status Report (FY2016) Composite Analysis for Low Level Waste Disposal in the Central Plateau of the Hanford Site

    Energy Technology Data Exchange (ETDEWEB)

    Weber, M. C. [INTERA, Inc., Austin, TX (United States); Nichols, W. E. [CH2M Hill Plateau Remediation Company, Richland, WA (United States)

    2017-03-14

    In accordance with U.S. Department of Energy (DOE) requirements in DOE O 435.1 and as implemented by DOE/RL-2009-29, the DOE Richland Operations Office has prepared this annual summary of the Hanford Site Composite Analysis for fiscal year 2016.

  9. Isotope Production at the Hanford Site in Richland, Washington

    Energy Technology Data Exchange (ETDEWEB)

    Ammoniums

    1999-06-01

    This report was prepared in response to a request from the Nuclear Energy Research Advisory Committee (NERAC) subcommittee on ''Long-Term Isotope Research and Production Plans.'' The NERAC subcommittee has asked for a reply to a number of questions regarding (1) ''How well does the Department of Energy (DOE) infrastructure sme the need for commercial and medical isotopes?'' and (2) ''What should be the long-term role of the federal government in providing commercial and medical isotopes?' Our report addresses the questions raised by the NERAC subcommittee, and especially the 10 issues that were raised under the first of the above questions (see Appendix). These issues are related to the isotope products offered by the DOE Isotope Production Sites, the capabilities and condition of the facilities used to produce these products, the management of the isotope production programs at DOE laboratories, and the customer service record of the DOE Isotope Production sites. An important component of our report is a description of the Fast Flux Test Facility (FFTF) reactor at the Hbford Site and the future plans for its utilization as a source of radioisotopes needed by nuclear medicine physicians, by researchers, and by customers in the commercial sector. In response to the second question raised by the NERAC subcommittee, it is our firm belief that the supply of isotopes provided by DOE for medical, industrial, and research applications must be strengthened in the near future. Many of the radioisotopes currently used for medical diagnosis and therapy of cancer and other diseases are imported from Canada, Europe, and Asia. This situation places the control of isotope availability, quality, and pricing in the hands of non-U.S. suppliers. It is our opinion that the needs of the U.S. customers for isotopes and isotope products are not being adequately served, and that the DOE infrastructure and facilities devoted to the supply of these products must be improved This perception forms one of the fundamental bases for our proposal that the FFTF, which is currently in a standby condition, be reactivated to supply nuclear services and products such as radioisotopes needed by the U.S. medical, industrial, and research communities.

  10. A new approach to analyzing vulnerability

    International Nuclear Information System (INIS)

    O'Callaghan, P.B.; Carlson, R.L.; Riedeman, G.W.

    1986-01-01

    The Westinghouse Hanford Company (WHC) has recently completed construction of the Fuel Cycle Plant (FCP) at Richland, Washington. At start-up the facility will fabricate driver fuel for the Fast Flux Test Facility in the Secure Automated Fabrication line. After construction completion, but before facility certification, the Department of Energy (DOE) Richland Operation Office requested that a vulnerability analysis be performed which assumed multiple insiders as a threat to the security system. A unique method of analyzing facility vulnerabilities was developed at the Security Applications Center (SAC), which is managed by WHC for DOE. The method that was developed verifies a previous vulnerability assessment, as well as introducing a modeling technique which analyzes security alarms in relation to delaying factors and possible insider activities. With this information it is possible to assess the relative strength or weakness of various possible routes to and from a target within a facility,

  11. New approach to analyzing vulnerability

    International Nuclear Information System (INIS)

    O'Callaghan, P.B.; Carlson, R.L.; Riedeman, G.W.

    1986-01-01

    The Westinghouse Hanford Company (WHC) has recently completed construction of the Fuel Cycle Plant (FCP) at Richland, Washington. At start-up the facility will fabricate driver fuel for the Fast Flux Test Facility in the Secure Automated Fabrication line. After construction completion, but before facility certification, the Department of Energy (DOE) Richland Operation Office requested that a vulnerability analysis be performed which assumed multiple insiders as a threat to the security system. A unique method of analyzing facility vulnerabilities was developed at the Security Applications Center (SAC), which is managed by WHC for DOE. The method that was developed verifies a previous vulnerability assessment, as well as introducing a modeling technique which analyzes security alarms in relation to delaying factors and possible insider activities. With this information it is possible to assess the relative strength or weakness of various possible routes to and from a target within a facility

  12. Hanford Diversification and the Tri-Cities Economy FY 1999

    International Nuclear Information System (INIS)

    SCOTT, M.J.

    2000-01-01

    The missions of the U.S. Department of Energy's Richland Operations Office (DOE/RL) are to safely manage the Hanford Site, to manage and clean up its legacy wastes, and to develop and deploy new science and technology in the environmental and energy fields. Collectively, DOE/RL and its contractors are the most important single entity in the Tri-Cities local economy (Pasco, Kennewick, and Richland, Washington, and the surrounding area). Although the relevant economic region affected by DOE/RL and its contractors actually embraces a geographic area reaching from Yakima in the west to Walla Walla in the east and from Moses Lake in the north to Pendleton, Oregon, in the south, over 90% of economic impacts likely occur in Benton and Franklin Counties. These two counties are defined as the ''local'' Tri-Cities economy for purposes of this study. In the federal fiscal year (FY) 1999 (October 1, 1998 through September 30, 1999), the total impact of DOE'S local $1.59 billion budget was felt through payrolls of $542 million and local purchases of goods and services of $226 million. The total local spending of $768 million was up slightly from the FY 1998 total of $765 million. Taking into account the multiplier effects of this spending, the DOE/RL budget sustained an estimated 32% of all local employment (28,250 out of 88,100 jobs) and about 35% of local earned income (almost $1.08 billion out of $3.08 billion). The decrease in these percentages from last year's report reflects an update of the model's economic structure based on the 1997 economic census year, a correction of a programming error in the model found during the update, and a broader definition of earnings that includes proprietor income, not just wages (see the Appendix for revisions to the previous forecasts). DOE budget increases in FY 2000 are expected to result in no change to the number of local DOE contractor jobs and about a $29 million increase in direct local spending

  13. RCRA facility investigation/corrective measures study work plan for the 100-DR-1 operable unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1992-09-01

    Four areas of the Hanford Site (the 100, 200, 300, and 1100 Areas) have been included on the US Environmental Protection Agency's (EPA's) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). Under the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement, Ecology et. al. 1990a), signed by the Washington State Department of Ecology (Ecology), EPA, and the US Department of Energy (DOE), more than 1,000 inactive waste disposal and unplanned release sites on the Hanford Site have been grouped into a number of source and groundwater operable units. These operable units contain contamination in the form of hazardous waste, radioactive/hazardous mixed waste, and other CERCLA hazardous substances. Also included in the Tri-Party Agreement are 55 Resource Conservation and Recovery Act (RCRA) treatment, storage, or disposal (TSD) facilities that will be closed or permitted to operate in accordance with RCRA regulations. Some of the TSD facilities are included in the operable units. This work plan and the attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the RCRA facility investigation/corrective measures study (RFI/CMS) for the 100-DR-1 source operable unit Source operable units include facilities and unplanned release sites that are potential sources of contamination

  14. Standard review plan for the review of environmental restoration remedial action quality assurance program plans

    International Nuclear Information System (INIS)

    1991-09-01

    This plan establishes both the scope of the review and the acceptance criteria to be utilized for the review of Quality Assurance Program Plans (QAPPs) developed in accordance with the requirements of DOE/RL-90-28. DOE/RL-90-28, the Environmental Restoration Remedial Action Quality Assurance Requirements Document (QARD) defines all quality assurance (QA) requirements governing activities that affect the quality of the Environmental Restoration Remedial Action (ERRA) program at the Hanford Site. These requirements are defined in three parts, Part 1 of Quality Management and Administration tasks, Part 2 for Environmental Data Operations, and Part 3 of the Design and Construction of items, systems, and facilities. The purpose of this document is to identify the scope of the review by the DOE Field Office, Richland staff, and establish the acceptance criteria (Parts 1, 2, and 3) that the DOE Field Office, Richland staff will utilize to evaluate the participant QAPPs. Use of the standard review plan will (1) help ensure that participant QAPPs contain the information required by DOE/RL-90-28, (2) aid program participant and DOE Field Office, Richland staff is ensuring that the information describing the participant's QAPP is complete, (3) help persons regarding DOE/RL- 90-28 to locate information, and (4) contribute to decreasing the time needed for the review process. In addition, the Standard Review Plan (SRP) ensures the quality and uniformity of the staff reviews and presents a well-defined base from which to evaluate compliance of participant quality programs against DOE/RL-90-28

  15. Environmental assessment: Solid waste retrieval complex, enhanced radioactive and mixed waste storage facility, infrastructure upgrades, and central waste support complex, Hanford Site, Richland, Washington

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    The U.S. Department of Energy (DOE) needs to take action to: retrieve transuranic (TRU) waste because interim storage waste containers have exceeded their 20-year design life and could fail causing a radioactive release to the environment provide storage capacity for retrieved and newly generated TRU, Greater-than-Category 3 (GTC3), and mixed waste before treatment and/or shipment to the Waste Isolation Pilot Project (WIPP); and upgrade the infrastructure network in the 200 West Area to enhance operational efficiencies and reduce the cost of operating the Solid Waste Operations Complex. This proposed action would initiate the retrieval activities (Retrieval) from Trench 4C-T04 in the 200 West Area including the construction of support facilities necessary to carry out the retrieval operations. In addition, the proposed action includes the construction and operation of a facility (Enhanced Radioactive Mixed Waste Storage Facility) in the 200 West Area to store newly generated and the retrieved waste while it awaits shipment to a final disposal site. Also, Infrastructure Upgrades and a Central Waste Support Complex are necessary to support the Hanford Site`s centralized waste management area in the 200 West Area. The proposed action also includes mitigation for the loss of priority shrub-steppe habitat resulting from construction. The estimated total cost of the proposed action is $66 million.

  16. Environmental assessment: Solid waste retrieval complex, enhanced radioactive and mixed waste storage facility, infrastructure upgrades, and central waste support complex, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1995-09-01

    The U.S. Department of Energy (DOE) needs to take action to: retrieve transuranic (TRU) waste because interim storage waste containers have exceeded their 20-year design life and could fail causing a radioactive release to the environment provide storage capacity for retrieved and newly generated TRU, Greater-than-Category 3 (GTC3), and mixed waste before treatment and/or shipment to the Waste Isolation Pilot Project (WIPP); and upgrade the infrastructure network in the 200 West Area to enhance operational efficiencies and reduce the cost of operating the Solid Waste Operations Complex. This proposed action would initiate the retrieval activities (Retrieval) from Trench 4C-T04 in the 200 West Area including the construction of support facilities necessary to carry out the retrieval operations. In addition, the proposed action includes the construction and operation of a facility (Enhanced Radioactive Mixed Waste Storage Facility) in the 200 West Area to store newly generated and the retrieved waste while it awaits shipment to a final disposal site. Also, Infrastructure Upgrades and a Central Waste Support Complex are necessary to support the Hanford Site's centralized waste management area in the 200 West Area. The proposed action also includes mitigation for the loss of priority shrub-steppe habitat resulting from construction. The estimated total cost of the proposed action is $66 million

  17. Central Waste Complex (CWC) Waste Analysis Plan

    International Nuclear Information System (INIS)

    ELLEFSON, M.D.

    2000-01-01

    The purpose of this waste analysis plan (WAP) is to document the waste acceptance process, sampling methodologies, analytical techniques, and overall processes that are undertaken for waste accepted for storage at the Central Waste Complex (CWC), which is located in the 200 West Area of the Hanford Facility, Richland, Washington. Because dangerous waste does not include the source special nuclear and by-product material components of mixed waste, radionuclides are not within the scope of this document. The information on radionuclides is provided only for general knowledge. This document has been revised to meet the interim status waste analysis plan requirements of Washington Administrative Code (WAC) 173 303-300(5). When the final status permit is issued, permit conditions will be incorporated and this document will be revised accordingly

  18. Environmental monitoring report for commercial low-level radioactive waste disposal sites (1960's through 1990's)

    International Nuclear Information System (INIS)

    1996-11-01

    During the time period covered in this report (1960's through early 1990's), six commercial low-level radioactive waste (LLRW) disposal facilities have been operated in the US. This report provides environmental monitoring data collected at each site. The report summarizes: (1) each site's general design, (2) each site's inventory, (3) the environmental monitoring program for each site and the data obtained as the program has evolved, and (4) what the program has indicated about releases to off-site areas, if any, including a statement of the actual health and safety significance of any release. A summary with conclusions is provided at the end of each site's chapter. The six commercial LLRW disposal sites discussed are located near: Sheffield, Illinois; Maxey Flats, Kentucky; Beatty, Nevada; West Valley, New York; Barnwell, South Carolina; Richland, Washington

  19. Work plan for the Hanford Environmental Dose Reconstruction Project

    Energy Technology Data Exchange (ETDEWEB)

    1989-12-01

    The primary objective of the Hanford Environmental Dose Reconstruction (HEDR) Project is to estimate the radiation doses that populations could have received from nuclear operations at the Hanford Site since 1944, with descriptions of uncertainties inherent in such estimates. The secondary objective is to make project records--information that HEDR staff members used to estimate radiation doses--available to the public. Preliminary dose estimates for a limited geographic area and time period, certain radionuclides, and certain populations are planned to be available in 1990; complete results are planned to be reported in 1993. Project reports and references used in the reports are available to the public in the DOE Public Reading Room in Richland, Washington. Project progress is documented in monthly reports, which are also available to the public in the DOE Public Reading Room.

  20. Field nondestructive assay measurements as applied to process inventories

    International Nuclear Information System (INIS)

    Westsik, G.A.

    1979-08-01

    An annual process equipment holdup inventory measurement program for a plutonium processing plant was instituted by Rockwell Hanford Operations (Rockwell) at Richland, Washington. The inventories, performed in 1977 and 1978, were designed to improve plutonium accountability and control. The inventory method used field nondestructive assay (NDA) measurement techniques with portable electronics and sodium iodide detectors. Access to and movement of plutonium in work areas was curtailed during the inventory process using administrative controls. Comparison of the two annual inventories showed good reproducibility of results within the calculated error ranges. For items where no plutonium movement occurred and which contained greater than 20 grams plutonium, the average measurement difference between the two inventories was 22%. The procedures and equipment used and the operational experience from the inventories are described

  1. Environmental Management Performance Report November 2000

    Energy Technology Data Exchange (ETDEWEB)

    EDER, D.M.

    2000-11-01

    The purpose of the Environmental Management Performance Report (EMPR) is to provide the Department of Energy Richland Operations Office's (DOE-RL's) report of Hanford's Environmental Management (EM) performance by: Project Hanford Management Contract (PHMC) through Fluor Hanford, Inc. (FH) and its subcontractors; Environmental Restoration Contract through Bechtel Hanford, Inc. (BHI), and its subcontractors; Pacific Northwest National Laboratories (PNNL) for Science and Technology support to the EM Mission; and Office of Safety Regulation of the TWRS Privatization Contractor. This report is a monthly publication that summarizes EM Site performance under RL Operations Office. It is organized by the four sections listed above, with each section containing an Executive Summary and Area Performance Summaries. A glossary of terms is provided at the end of this report for reference purposes.

  2. High-Level Waste Melter Study Report

    Energy Technology Data Exchange (ETDEWEB)

    Perez, Joseph M.; Bickford, Dennis F.; Day, Delbert E.; Kim, Dong-Sang; Lambert, Steven L.; Marra, Sharon L.; Peeler, David K.; Strachan, Denis M.; Triplett, Mark B.; Vienna, John D.; Wittman, Richard S.

    2001-07-13

    At the Hanford Site in Richland, Washington, the path to site cleanup involves vitrification of the majority of the wastes that currently reside in large underground tanks. A Joule-heated glass melter is the equipment of choice for vitrifying the high-level fraction of these wastes. Even though this technology has general national and international acceptance, opportunities may exist to improve or change the technology to reduce the enormous cost of accomplishing the mission of site cleanup. Consequently, the U.S. Department of Energy requested the staff of the Tanks Focus Area to review immobilization technologies, waste forms, and modifications to requirements for solidification of the high-level waste fraction at Hanford to determine what aspects could affect cost reductions with reasonable long-term risk. The results of this study are summarized in this report.

  3. Annual Status Report (FY 2017): Composite Analysis for Low Level Waste Disposal in the Central Plateau of the Hanford Site

    Energy Technology Data Exchange (ETDEWEB)

    Weber, M. C.; Nichols, W. E.; Lehman, L. L.

    2018-04-05

    In accordance with U.S. Department of Energy (DOE) requirements in DOE M 435.1 Chg. 1, and as implemented by DOE/RL-2009-29, the DOE Richland Operations Office has prepared this annual summary of the Hanford Site Composite Analysis for fiscal year 2017.

  4. IRP Stage 2 Remedial Investigation/Feasibility Study, Appendices A through K and M through R, for BOMARC Missile Site, McGuire AFB, New Jersey.

    Science.gov (United States)

    1992-05-26

    Mellinger, P. J., R. D. Stenner , D. K. Landstrom, D. G. Watson, C. E. Cushing and R. A. Ewing. 1987. Evaluation of the Potential Environmental...Northwest Weatherized Residences. PNL-6058, Pacific Northwest Laboratory, Richland, Washington. Mellinger, P. J., and R. D. Stenner . 1986. Environmental

  5. First report of the spiral nematode Helicotylenchus microlobus infecting soybean in North Dakota

    Science.gov (United States)

    Spiral nematodes (Helicotylenchus spp.) are common plant-parasitic nematodes in fields of many crops. In June 2015, two soil samples were collected from a soybean field in Richland County, ND. Nematodes were extracted from soil using the sugar centrifugal flotation method. Plant-parasitic nematodes ...

  6. 75 FR 27999 - Environmental Management Site-Specific Advisory Board, Hanford

    Science.gov (United States)

    2010-05-19

    ...: Red Lion Hotel Hanford House, 802 George Washington Way, Richland, WA 99352. FOR FURTHER INFORMATION...; and Budgets and Contracts Committee Beryllium update CERCLA 5-year review scoping update Lifecycle... [cir] TPA proposed change packages (M-15, M-91) [cir] 2012 Budget Request Board Business Public...

  7. Environmental Assessment Offsite Thermal Treatment of Low-Level Mixed Waste

    Energy Technology Data Exchange (ETDEWEB)

    N/A

    1999-05-06

    The U.S. Department of Energy (DOE), Richland Operations Office (RL) needs to demonstrate the economics and feasibility of offsite commercial treatment of contact-handled low-level mixed waste (LLMW), containing polychlorinated biphenyls (PCBS) and other organics, to meet existing regulatory standards for eventual disposal.

  8. Maintenance and operations contractor plan for transition to the project Hanford management contract (PHMC)

    Energy Technology Data Exchange (ETDEWEB)

    Waite, J.L.

    1996-04-12

    This plan has been developed by Westinghouse Hanford Company (WHC), and its subcontractors ICF Kaiser Hanford (ICF KH) and BCS Richland, Inc. (BCSR), at the direction of the US Department of Energy (DOE), Richland Operations Office (RL). WHC and its subcontractors are hereafter referred to as the Maintenance and Operations (M and O) Contractor. The plan identifies actions involving the M and O Contractor that are critical to (1) prepare for a smooth transition to the Project Hanford Management Contractor (PHMC), and (2) support and assist the PHMC and RL in achieving transition as planned, with no or minimal impact to ongoing baseline activities. The plan is structured around two primary phases. The first is the pre-award phase, which started in mid-February 1996 and is currently scheduled to be completed on June 1, 1996, at which time the contract is currently planned to be awarded. The second is the follow-on four-month post-award phase from June 1, 1996, until October 1, 1996. Considering the magnitude and complexity of the scope of work being transitioned, completion in four months will require significant effort by all parties. To better ensure success, the M and O Contractor has developed a pre-award phase that is intended to maximize readiness for transition. Priority is given to preparation for facility assessments and processing of personnel, as these areas are determined to be on the critical path for transition. In addition, the M and O Contractor will put emphasis during the pre-award phase to close out open items prior to contract award, to include grievances, employee concerns, audit findings, compliance issues, etc.

  9. 75 FR 3902 - Notice of Public Hearings on the Draft Tank Closure and Waste Management Environmental Impact...

    Science.gov (United States)

    2010-01-25

    ... Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland... Environmental Management. [FR Doc. 2010-1306 Filed 1-22-10; 8:45 am] BILLING CODE 6450-01-P ... DEPARTMENT OF ENERGY Notice of Public Hearings on the Draft Tank Closure and Waste Management...

  10. 75 FR 1048 - Notice of Public Hearings on the Draft Tank Closure and Waste Management Environmental Impact...

    Science.gov (United States)

    2010-01-08

    ... Draft Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland..., Office of Environmental Compliance, Office of Environmental Management. [FR Doc. 2010-224 Filed 1-7-10; 8... DEPARTMENT OF ENERGY Notice of Public Hearings on the Draft Tank Closure and Waste Management...

  11. 77 FR 20078 - Request for a License To Import Radioactive Waste

    Science.gov (United States)

    2012-04-03

    ... NUCLEAR REGULATORY COMMISSION Request for a License To Import Radioactive Waste Pursuant to 10 CFR 110.70 (b) ``Public Notice of Receipt of an Application,'' please take notice that the Nuclear.... docket No. Perma-Fix Northwest Richland, Radioactive waste Up to 500 tons of Thermal Mexico. Inc...

  12. Speciated particle dry deposition to the sea surface: Results from ASEPS '97

    DEFF Research Database (Denmark)

    Pryor, S.C.; Barthelmie, R.J.; Geernaert, L.L.S.

    1999-01-01

    on Precipitation Scavenging and Atmosphere-Surface Exchange Processes. AMS, Richland, Washington, USA, 12pp.) model to calculate size-segregated dry deposition of particle inorganic nitrogen compounds to the western Baltic during the late Spring of 1997 based on data collected as part of the Air-Sea Exchange...

  13. 76 FR 10574 - Notice of Availability of the Draft Environmental Impact Statement for the Disposal of Greater...

    Science.gov (United States)

    2011-02-25

    ... Information/Zimmerman Library, University of New Mexico, MSC05 3020, 1 University of New Mexico, Albuquerque... University of South Carolina-Aiken, Gregg-Graniteville Library, 471 University Parkway, Aiken, SC 29801, (803... Drive, Room 101L, Richland, WA 99352, (509) 372-7443. University of Washington, Suzzallo-Allen Library...

  14. BEATRIX-2 Program third annual report, January 1990--December 1990

    International Nuclear Information System (INIS)

    Slagle, O.D.; Hollenberg, G.W.

    1991-10-01

    The BEATRIX-2 experiment is an International Energy Agency (IEA) sponsored collaborative experiment between Japan, Canada, and the United States. The purpose of the experiment is to evaluate the performance of ceramic solid breeder materials in a fast neutron environment. To do this, an in-situ tritium recovery experiment is being conducted in the Fast Flux Test Facility (FFTF), located on the Hanford site near Richland, Washington, and operated by Westinghouse Hanford Company (WHC). The Pacific Northwest Laboratory (PNL), Richland, Washington, together with the Japan Atomic Energy Research Institute (JAERI) and Atomic Energy of Canada Limited (AECL) are responsible for conducting the experiment. This work is divided into two phases: Phase 1 was irradiated from January 1990 until March 1991 in Cycle 11 of FFTF, while Phase 2 will be irradiated in Cycle 12, which began in June 1991 and is scheduled to continue until approximately October of 1991 for 300 effective full power days (EFPD)

  15. United States Department of Energy Richland Operations Office Environmental Protection Implementation Plan: November 9, 1993, to November 9, 1994

    International Nuclear Information System (INIS)

    1993-11-01

    The hub of today's programs at the Hanford Site are activities dedicated to managing stored and new wastes and cleanup of waste sites. To ensure focused planning and implementing efforts for these programs, management of the site is assigned to DOE's Office of Environmental Restoration and Waste Management. This report describes policies and procedures in the following areas: Compliance activities; Environmental restoration; Waste management; and Technology development. Procedures for notification of environmental occurrences, long-range environmental protection planning and reporting, waste management programs; environmental monitoring programs, and quality assurance and data verification are also described and discussed

  16. 75 FR 54631 - Proposed Approval of the Central Characterization Project's Transuranic Waste Characterization...

    Science.gov (United States)

    2010-09-08

    ... determined that WIPP complies with the Agency's radioactive waste disposal regulations at 40 CFR part 191... Site in Richland, Washington. This waste is intended for disposal at the Waste Isolation Pilot Plant..., near Carlsbad in southeastern New Mexico, as a deep geologic repository for disposal of TRU radioactive...

  17. Implementation plan for Hanford Site compliance with US Department of Energy Order 5820.2A

    International Nuclear Information System (INIS)

    1989-04-01

    This document is the plan of the Department of Energy, Richland Operations Office to achieve compliance with DOE 5820.2A, Radioactive Waste Management. The plan describes activities, costs, and completion dates to achieve compliance with requirements for the management of radioactive and mixed wastes. 26 refs., 7 figs

  18. Risk management study for the Hanford Site facilities: Risk reduction cost comparison for the retired Hanford Site facilities

    International Nuclear Information System (INIS)

    Coles, G.A.; Egge, R.G.; Senger, E.; Shultz, M.W.; Taylor, W.E.

    1994-02-01

    This document provides a cost-comparison evaluation for implementing certain risk-reduction measures and their effect on the overall risk of the 100 and 200 Area retired, surplus facilities. The evaluation is based on conditions that existed at the time the risk evaluation team performed facility investigations, and does not acknowledge risk-reduction measures that occurred soon after risk identification. This evaluation is one part of an overall risk management study for these facilities. The retired facilities investigated for this evaluation are located in the 100 and 200 Areas of the 1450-km 2 Hanford Site. The Hanford Site is a semiarid tract of land in southeastern Washington State. The nearest population center is Richland, Washington, (population 32,000) 30 km southeast of the 200 Area. This cost-comparison evaluation (1) determines relative costs for reducing risk to acceptable levels; (2) compares the cost of reducing risk using different risk-reduction options; and (3) compares the cost of reducing risks at different facilities. The result is an identification of the cost effective risk-reduction measures. Supporting information required to develop costs of the various risk-reduction options also is included

  19. Risk management study for the retired Hanford Site facilities: Qualitative risk evaluation for the retired Hanford Site facilities

    International Nuclear Information System (INIS)

    Coles, G.A.; Shultz, M.V.; Taylor, W.E.

    1993-09-01

    This document provides a risk evaluation of the 100 and 200 Area retired, surplus facilities on the Hanford Site. Also included are the related data that were compiled by the risk evaluation team during investigations performed on the facilities. Results are the product of a major effort performed in fiscal year 1993 to produce qualitative information that characterizes certain risks associated with these facilities. The retired facilities investigated for this evaluation are located in the 100 and 200 Areas of the 1,450-km 2 (570-mi 2 ) Hanford Site. The Hanford Site is a semiarid tract of land in southeastern Washington State. The nearest population center is Richland, Washington, (population 32,000) 30-km (20 mi) southeast of the 200 Area. During walkdown investigations of these facilities, data on real and potential hazards that threatened human health or safety or created potential environmental release issues were identified by the risk evaluation team. Using these findings, the team categorized the identified hazards by facility and evaluated the risk associated with each hazard. The factors contributing to each risk, and the consequence and likelihood of harm associated with each hazard also are included in this evaluation

  20. 303-K Radioactive Mixed-Waste Storage Facility closure plan

    International Nuclear Information System (INIS)

    1991-11-01

    The Hanford Site, located northwest of Richland, Washington, houses reactors chemical-separation systems, and related facilities used for the production o special nuclear materials. The 300 Area of the Hanford Site contains reactor fuel manufacturing facilities and several research and development laboratories. The 303-K Radioactive Mixed-Waste Storage Facility (303-K Facility) has been used since 1943 to store various radioactive,and dangerous process materials and wastes generated by the fuel manufacturing processes in the 300 Area. The mixed wastes are stored in US Department of Transportation (DOT)-specification containers (DOT 1988). The north end of the building was used for storage of containers of liquid waste and the outside storage areas were used for containers of solid waste. Because only the north end of the building was used, this plan does not include the southern end of the building. This closure plan presents a description of the facility, the history of materials and wastes managed, and a description of the procedures that will be followed to chose the 303-K Facility as a greater than 90-day storage facility. The strategy for closure of the 303-K Facility is presented in Chapter 6.0

  1. Risk management study for the Hanford Site facilities: Risk reduction cost comparison for the retired Hanford Site facilities. Volume 4

    Energy Technology Data Exchange (ETDEWEB)

    Coles, G.A.; Egge, R.G.; Senger, E.; Shultz, M.W.; Taylor, W.E.

    1994-02-01

    This document provides a cost-comparison evaluation for implementing certain risk-reduction measures and their effect on the overall risk of the 100 and 200 Area retired, surplus facilities. The evaluation is based on conditions that existed at the time the risk evaluation team performed facility investigations, and does not acknowledge risk-reduction measures that occurred soon after risk identification. This evaluation is one part of an overall risk management study for these facilities. The retired facilities investigated for this evaluation are located in the 100 and 200 Areas of the 1450-km{sup 2} Hanford Site. The Hanford Site is a semiarid tract of land in southeastern Washington State. The nearest population center is Richland, Washington, (population 32,000) 30 km southeast of the 200 Area. This cost-comparison evaluation (1) determines relative costs for reducing risk to acceptable levels; (2) compares the cost of reducing risk using different risk-reduction options; and (3) compares the cost of reducing risks at different facilities. The result is an identification of the cost effective risk-reduction measures. Supporting information required to develop costs of the various risk-reduction options also is included.

  2. Risk management study for the retired Hanford Site facilities: Qualitative risk evaluation for the retired Hanford Site facilities. Volume 3

    Energy Technology Data Exchange (ETDEWEB)

    Coles, G.A.; Shultz, M.V.; Taylor, W.E.

    1993-09-01

    This document provides a risk evaluation of the 100 and 200 Area retired, surplus facilities on the Hanford Site. Also included are the related data that were compiled by the risk evaluation team during investigations performed on the facilities. Results are the product of a major effort performed in fiscal year 1993 to produce qualitative information that characterizes certain risks associated with these facilities. The retired facilities investigated for this evaluation are located in the 100 and 200 Areas of the 1,450-km{sup 2} (570-mi{sup 2}) Hanford Site. The Hanford Site is a semiarid tract of land in southeastern Washington State. The nearest population center is Richland, Washington, (population 32,000) 30-km (20 mi) southeast of the 200 Area. During walkdown investigations of these facilities, data on real and potential hazards that threatened human health or safety or created potential environmental release issues were identified by the risk evaluation team. Using these findings, the team categorized the identified hazards by facility and evaluated the risk associated with each hazard. The factors contributing to each risk, and the consequence and likelihood of harm associated with each hazard also are included in this evaluation.

  3. Expanded public notice: Washington State notice of intent for corrective action management unit, Hanford Environmental Restoration Disposal

    International Nuclear Information System (INIS)

    1994-01-01

    This document is to serve notice of the intent to operate an Environmental Restoration Disposal Facility (ERDF), adjacent to the 200 West Area of the Hanford Facility, Richland, Washington, as a Corrective Action Management Unit (CAMU), in accordance with 40 Code of Federal Regulation (CFR) 264.552. The ERDF CAMU will serve as a management unit for the majority of waste (primarily soil) excavated during remediation of waste management sites on the Hanford Facility. Only waste that originates from the Hanford Facility can be accepted in this ERDF CAMU. The waste is expected to consist of dangerous waste, radioactive waste, and mixed waste. Mixed waste contains radioactive and dangerous components. The primary features of the ERDF could include the following: one or more trenches, rail and tractor/trailer container handling capability, railroads, an inventory control system, a decontamination building, and operational offices

  4. AN APPROACH TO CHARACTERIZING and EVALUATING ALTERNATIVES FOR THE DECOMMISSIONING OF SUB-GRADE STRUCTURES AT THE PLUTONIUM FINISHING PLANT

    International Nuclear Information System (INIS)

    HOPKINS, A.M.; KLOS, D.B.

    2007-01-01

    In 2002, the Richland Operations Office (RL) of the US Department of Energy (DOE), the US Environmental Protection Agency (EPA), and the Washington State Department of Ecology (Ecology) developed milestones for transitioning the Plutonium Finishing Plant (PFP) facility to a clean slab-on-grade configuration. These milestones required developing an engineering evaluation/cost analysis (EF/CA) for the facility's sub-grade structures and installations as part of a series of evaluations intended to provide for the transition of the facility to a clean slab-on-grade configuration. In addition to supporting decisions for interim actions, the analyses of sub-grade structures and installations performed through this EE/CA will contribute to the remedial investigation feasibility study(ies) and subsequently to the final records of decision for the relevant operable units responsible for site closure in the 200 West Area of the Hanford Site

  5. Hanford radiological protection support services annual report for 1988

    International Nuclear Information System (INIS)

    Lyon, M.; Fix, J.J.; Kenoyer, J.L.; Leonowich, J.A.; Palmer, H.E.; Sula, M.J.

    1989-06-01

    The report documents the performance of certain radiological protection sitewide services during calendar year (CY) 1988 by Pacific Northwest Laboratory (PNL) in support of the US Department of Energy-Richland Operations Office (DOE-RL) and contractor activities on the Hanford Site. The routine program for each service is discussed along with any significant program changes and tasks, investigations, and studies performed in support of each program. Other related activities such as publications, presentations, and memberships on standard or industry committees are also listed. The programs covered provide services in the areas of (1) internal dosimetry, (2) in vivo measurements, (3) external dosimetry, (4) instrument calibration and evaluation, (5) calibration of radiation sources traceable to the National Institute of Standards and Technology (NIST) (formerly the National Bureau of Standards), and (6) radiological records. 23 refs., 15 figs., 15 tabs

  6. Environmental monitoring report for commercial low-level radioactive waste disposal sites (1960`s through 1990`s)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-11-01

    During the time period covered in this report (1960`s through early 1990`s), six commercial low-level radioactive waste (LLRW) disposal facilities have been operated in the US. This report provides environmental monitoring data collected at each site. The report summarizes: (1) each site`s general design, (2) each site`s inventory, (3) the environmental monitoring program for each site and the data obtained as the program has evolved, and (4) what the program has indicated about releases to off-site areas, if any, including a statement of the actual health and safety significance of any release. A summary with conclusions is provided at the end of each site`s chapter. The six commercial LLRW disposal sites discussed are located near: Sheffield, Illinois; Maxey Flats, Kentucky; Beatty, Nevada; West Valley, New York; Barnwell, South Carolina; Richland, Washington.

  7. 618-11 Burial Ground USRADS radiological surveys

    International Nuclear Information System (INIS)

    Wendling, M.A.

    1994-01-01

    This report summarizes and documents the results of the radiological surveys conducted from February 4 through February 10, 1993 over the 618-11 Burial Ground, Hanford Site, Richland, Washington. In addition, this report explains the survey methodology using the Ultrasonic Ranging and Data System (USRADS). The 618-11 Burial Ground radiological survey field task consisted of two activities: characterization of the specific background conditions and the radiological survey of the area. The radiological survey of the 618-11 Burial Ground, along with the background study, were conducted by Site Investigative Surveys Environmental Restoration Health Physics Organization of the Westinghouse Hanford Company. The survey methodology was based on utilization of the Ultrasonic Ranging and Data System (USRADS) for automated recording of the gross gamma radiation levels at or near six (6) inches and at three (3) feet from the surface soil

  8. Review of selected 100-N waste sites related to N-Springs remediation projects

    International Nuclear Information System (INIS)

    DeFord, D.H.; Carpenter, R.W.

    1996-01-01

    This document has been prepared in support of the environmental restoration program at the US Department of Energy's Hanford Site near Richland, Washington, by the Bechtel Hanford, Inc. Facility and Waste Site Research Office. It provides historical information that documents and characterizes selected waste sites that are related to the N-Springs remediation projects. The N-Springs are a series of small, inconspicuous groundwater seepage springs located along the Columbia River shoreline near the 100-N Reactor. The spring site is hydrologically down-gradient from several 100-N Area liquid waste sites that are believed to have been the source(s) of the effluents being discharged by the springs. This report documents and characterizes these waste sites, including the 116-N-1 Crib and Trench, 116-N-3 Crib and Trench, unplanned releases, septic tariks, and a backwash pond

  9. An American System of Staff Appraisal. Coombe Lodge Case Study. Information Bank Number 1017.

    Science.gov (United States)

    Latcham, J.

    Prepared for staff in the British further education system, this report describes and explains the formal staff assessment model used at Richland College, Texas. Introductory material describes the college, its student body, and its organization and structure. Next, the four components of the teacher evaluation system used in the Dallas Community…

  10. 40 CFR 81.341 - South Carolina.

    Science.gov (United States)

    2010-07-01

    ... County X Laurens County X Lee County X Lexington County X McCormick County X Marion County X Marlboro... X McCormick County X Marion County X Marlboro County X Newberry County X Oconee County X Orangeburg... County McCormick County Newberry County Oconee County Orangeburg County Pickens County Richland County...

  11. Final decommissioning report for the 183-C Filter Building/Pumproom facility

    International Nuclear Information System (INIS)

    Marske, S.G.

    1997-04-01

    This report documents the decommissioning and demolition (D ampersand D) of the 183-C Filter Building/Pumproom facility (located at the Hanford Site in Richland, Washington). The 183-C Facility D ampersand D involved the performance of characterization to support the development of a project plan and final hazard classification

  12. 76 FR 61075 - Foreign-Trade Zone 127-Columbia, SC; Application for Reorganization/Expansion Under Alternative...

    Science.gov (United States)

    2011-10-03

    ... Board on July 2, 1986 (Board Order 333, 51 FR 25075, 7/10/86). The current zone project includes the... DEPARTMENT OF COMMERCE Foreign-Trade Zones Board [Docket 57-2011] Foreign-Trade Zone 127--Columbia... submitted to the Foreign-Trade Zones (FTZ) Board (the Board) by the Richland-Lexington Airport District...

  13. 76 FR 50913 - Changes in Flood Elevation Determinations

    Science.gov (United States)

    2011-08-17

    ... respective addresses are listed in the table below. FOR FURTHER INFORMATION CONTACT: Luis Rodriguez, Chief..., Huntsville, AL 35801. Madison City of Madison (10- June 30, 2011; July The Honorable Paul November 4, 2011... Paul September 12, 2011 450170 of Richland County 2011; The Columbia Livingston, Chairman, (11-04-1879P...

  14. 3718-F Alkali Metal Treatment and Storage Facility Closure Plan

    International Nuclear Information System (INIS)

    1992-11-01

    The Hanford Site, located northwest of the city of Richland, Washington, houses reactors, chemical-separation systems, and related facilities used for the production of special nuclear materials, as well as for activities associated with nuclear energy development. The 300 Area of the Hanford Site contains reactor fuel manufacturing facilities and several research and development laboratories. The 3718-F Alkali Metal Treatment and Storage Facility (3718-F Facility), located in the 300 Area, was used to store and treat alkali metal wastes. Therefore, it is subject to the regulatory requirements for the storage and treatment of dangerous wastes. Closure will be conducted pursuant to the requirements of the Washington Administrative Code (WAC) 173-303-610 (Ecology 1989) and 40 CFR 270.1. Closure also will satisfy the thermal treatment facility closure requirements of 40 CFR 265.381. This closure plan presents a description of the 3718-F Facility, the history of wastes managed, and the approach that will be followed to close the facility. Only hazardous constituents derived from 3718-F Facility operations will be addressed

  15. 3718-F Alkali Metal Treatment and Storage Facility Closure Plan. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    None

    1992-11-01

    The Hanford Site, located northwest of the city of Richland, Washington, houses reactors, chemical-separation systems, and related facilities used for the production of special nuclear materials, as well as for activities associated with nuclear energy development. The 300 Area of the Hanford Site contains reactor fuel manufacturing facilities and several research and development laboratories. The 3718-F Alkali Metal Treatment and Storage Facility (3718-F Facility), located in the 300 Area, was used to store and treat alkali metal wastes. Therefore, it is subject to the regulatory requirements for the storage and treatment of dangerous wastes. Closure will be conducted pursuant to the requirements of the Washington Administrative Code (WAC) 173-303-610 (Ecology 1989) and 40 CFR 270.1. Closure also will satisfy the thermal treatment facility closure requirements of 40 CFR 265.381. This closure plan presents a description of the 3718-F Facility, the history of wastes managed, and the approach that will be followed to close the facility. Only hazardous constituents derived from 3718-F Facility operations will be addressed.

  16. MANHATTAN PROJECT B REACTOR HANFORD WASHINGTON [HANFORD'S HISTORIC B REACTOR (12-PAGE BOOKLET)

    Energy Technology Data Exchange (ETDEWEB)

    GERBER MS

    2009-04-28

    The Hanford Site began as part of the United States Manhattan Project to research, test and build atomic weapons during World War II. The original 670-square mile Hanford Site, then known as the Hanford Engineer Works, was the last of three top-secret sites constructed in order to produce enriched uranium and plutonium for the world's first nuclear weapons. B Reactor, located about 45 miles northwest of Richland, Washington, is the world's first full-scale nuclear reactor. Not only was B Reactor a first-of-a-kind engineering structure, it was built and fully functional in just 11 months. Eventually, the shoreline of the Columbia River in southeastern Washington State held nine nuclear reactors at the height of Hanford's nuclear defense production during the Cold War era. The B Reactor was shut down in 1968. During the 1980's, the U.S. Department of Energy began removing B Reactor's support facilities. The reactor building, the river pumphouse and the reactor stack are the only facilities that remain. Today, the U.S. Department of Energy (DOE) Richland Operations Office offers escorted public access to B Reactor along a designated tour route. The National Park Service (NPS) is studying preservation and interpretation options for sites associated with the Manhattan Project. A draft is expected in summer 2009. A final report will recommend whether the B Reactor, along with other Manhattan Project facilities, should be preserved, and if so, what roles the DOE, the NPS and community partners will play in preservation and public education. In August 2008, the DOE announced plans to open B Reactor for additional public tours. Potential hazards still exist within the building. However, the approved tour route is safe for visitors and workers. DOE may open additional areas once it can assure public safety by mitigating hazards.

  17. Annual Status Report (FY2013 Composite Analysis of Low Level Waste Disposal in the Central Plateau at the Hanford Site

    Energy Technology Data Exchange (ETDEWEB)

    Nichols, W. E. [CH2M HILL Plateau Remediation Company, Richland, WA (United States)

    2014-03-25

    In accordance with U.S. Department of Energy (DOE) requirements in DOE O 435.1, 3 Chg. 11, and as implemented by DOE/RL-2000-29, Rev. 22, the DOE Richland Operations 4 Office (DOE-RL) has prepared this annual summary of the Hanford Site Composite Analysis 5 for fiscal year (FY) 2013.

  18. Thinking About America’s Defense. An Analytical Memoir

    Science.gov (United States)

    2008-01-01

    school at Richlands, Virginia. In 1953, they wed, and she would be his lifelong companion and inspiration. After a few years on the Air Staff, General...paraphrase Shakespeare , the proposal’s the thing where- with we’ll tap the coffers of the king. The central question is whether or not a proposed concept

  19. 78 FR 16713 - Board Meeting; April 16, 2013; Richland, WA

    Science.gov (United States)

    2013-03-18

    ... disposal of low-level radioactive waste. The Board's technical and scientific review of DOE activities at... Waste Technical Review Board will meet to discuss DOE work on the vitrified HLW waste form for disposal... Energy (DOE) activities related to vitrifying high-level radioactive waste (HLW) stored at the Hanford...

  20. Hanford Remedial Action Environmental Impact Statement, Richland, Washington. Implementation Plan

    International Nuclear Information System (INIS)

    1995-06-01

    This implementation plan was prepared in compliance in compliance with 10 CFR 1021. It includes the following sections: introduction; purpose and need for departmental action; scope, content, and alternatives for the HRA EIS; public participation process; schedule for preparation of the HRA EIS; anticipated environmental reviews and consultations; and contractor disclosure statement. The following appendices are also included: notice of intent, federal register notice for extension of public scoping period, proposed annotated outline for the draft HRA EIS, summary of final report for the Hanford Future Site Uses Working Group, and summary of comments and responses from the public scoping process

  1. Control Areas

    Data.gov (United States)

    Department of Homeland Security — This feature class represents electric power Control Areas. Control Areas, also known as Balancing Authority Areas, are controlled by Balancing Authorities, who are...

  2. Study of alternative methods for the management of liquid scintillation counting wastes

    International Nuclear Information System (INIS)

    Roche-Farmer, L.

    1980-02-01

    The Nuclear Engineering Waste Disposal Site in Richland, Washington, is the only radioactive waste disposal facility that will accept liquid scintillation counting wastes (LSCW) for disposal. That site is scheduled to discontinue receiving LSCW by the end of 1982. This document explores alternatives presently available for management of LSCW: evaporation, distillation, solidification, conversion, and combustion

  3. Testing of wet scrap recovery equipment for mixed oxide scrap reprocessing

    International Nuclear Information System (INIS)

    Demiter, J.A.; Klem, M.J.; Owen, T.J.

    1984-08-01

    The Wet Scrap Recovery (WSR) program was initiated at the Hanford Engineering Development Laboratory (HEDL) by Westinghouse Hanford Company in Richland, Washington to demonstrate fuel fabrication scrap recovery and reconversion to fuel grade oxide powder using the continuous coprecipitation-calcination (COPRECAL) conversion process. Advancements in process control equipment and instrumentation were also developed and demonstrated

  4. Who's in the Mirror?: Issues Surrounding the Identity Construction of Music Educators

    Science.gov (United States)

    Roberts, Brian

    2004-01-01

    The article presents the text of a guest lecture delivered at Richland College in Dallas, Texas, in April 2003, by Brian A. Roberts, professor of music education at the Memorial University of Newfoundland. Speaking to an audience of music education students, he discusses his ongoing research of the identity construction of music educators (do they…

  5. Decision process for Hanford sitewide groundwater remediation

    International Nuclear Information System (INIS)

    Chiaramonte, G.R.

    1996-06-01

    This document describes a decision process for planning future investigations and remediating contaminated groundwater at the Hanford Site in Richland, Washington. This decision process details the following: identifies key decisions and activities; defines the criteria used in making each decision; and defines the logic that links the decisions and the activities in a stepwise manner

  6. 76 FR 44276 - Changes in Flood Elevation Determinations

    Science.gov (United States)

    2011-07-25

    ...] 0 2. The tables published under the authority of Sec. 65.4 are amended as follows: Date and name of... modification Community No. notice was published of community No. Delaware: New Castle Town of Odessa (11-03..., Richland Hills, TX 76182. Travis City of Austin (10-06- December 30, 2010; The Honorable Lee December 23...

  7. Advanced international training course on state systems of accounting for and control of nuclear materials

    International Nuclear Information System (INIS)

    1981-10-01

    This report incorporates all lectures and presentations at the Advanced International Training Course on State Systems of Accounting for and Control of Nuclear Material held April 27 through May 12, 1981 at Santa Fe and Los Alamos, New Mexico, and Richland, Washington, USA. Authorized by the US Nuclear Non-Proliferation Act and sponsored by the US Department of Energy in cooperation with the International Atomic Energy Agency, the course was developed to provide practical training in the design, implementation, and operation of a state system of nuclear materials accountability and control that satisfies both national and international safeguards. Major emphasis for the 1981 course was placed on safeguards methods used at bulk-handling facilities, particularly low-enriched uranium conversion and fuel fabrication plants. The course was conducted by the University of California's Los Alamos National Laboratory, the Battelle Pacific Northwest Laboratory, and Exxon Nuclear Company, Inc. Tours and demonstrations were arranged at both the Los Alamos National Laboratory, Los Alamos, New Mexico, and the Exxon Nuclear fuel fabrication plant, Richland, Washington

  8. Stakeholder involvement in redefining Hanford's Double-Shell Tank Waste Disposal Program

    International Nuclear Information System (INIS)

    Triplett, M.B.; Hunter, V.L.

    1992-01-01

    Hanford's Double-Shell Tank (DST) waste disposal strategy, outlined in the Final Environmental Impact Statement, Disposal of Hanford Defense High-Level, Transuranic and Tank Wastes, Hanford Site, Richland, Washington calls for using B-Plant to separate the low-level and high-level portions of the DST waste. This separations step would provide feed to the Hanford Waste Vitrification Plant (HWVP), viewed by many as the cornerstone to Site cleanup. The State of Washington strongly opposed using the 47-year old B-Plant because it was not built to comply with current environmental regulations. Because of this and other challenges to Hanford's tank waste disposal strategy, the Department of Energy (DOE) Richland Field Office (RL) initiated efforts to redefine the strategy. To support this effort, Pacific Northwest Laboratory, (PNL) and Westinghouse Hanford Company, (WHC) and sought input from outside stakeholder (stakeholders are those interest groups that are affected by the outcome of the decision and have a strong desire to ensure that their concerns are addressed) groups through a formal stakeholder involvement and multiattribute utility (MAU) analysis process

  9. Advanced international training course on state systems of accounting for and control of nuclear materials

    Energy Technology Data Exchange (ETDEWEB)

    1981-10-01

    This report incorporates all lectures and presentations at the Advanced International Training Course on State Systems of Accounting for and Control of Nuclear Material held April 27 through May 12, 1981 at Santa Fe and Los Alamos, New Mexico, and Richland, Washington, USA. Authorized by the US Nuclear Non-Proliferation Act and sponsored by the US Department of Energy in cooperation with the International Atomic Energy Agency, the course was developed to provide practical training in the design, implementation, and operation of a state system of nuclear materials accountability and control that satisfies both national and international safeguards. Major emphasis for the 1981 course was placed on safeguards methods used at bulk-handling facilities, particularly low-enriched uranium conversion and fuel fabrication plants. The course was conducted by the University of California's Los Alamos National Laboratory, the Battelle Pacific Northwest Laboratory, and Exxon Nuclear Company, Inc. Tours and demonstrations were arranged at both the Los Alamos National Laboratory, Los Alamos, New Mexico, and the Exxon Nuclear fuel fabrication plant, Richland, Washington.

  10. Integral Monitored Retrievable Storage (MRS) Facility conceptual design report

    International Nuclear Information System (INIS)

    1985-09-01

    This report presents a summary design description of the Conceptual Design for an Integral Monitored Retrievable Storage (MRS) Facility, as prepared by The Ralph M. Parsons Company under an A-E services contract with the Richland Operations Office of the Department of Energy. More detailed design requirements and design data are set forth in the Basis for Design and Design Report, bound under separate cover and available for reference by those desiring such information. The design data provided in this Design Report Executive Summary, the Basis for Design, and the Design Report include contributions by the Waste Technology Services Division of Westinghouse Electric Corporation (WEC), which was responsible for the development of the waste receiving, packaging, and storage systems, and Golder Associates Incorporated (GAI), which supported the design development with program studies. The MRS Facility design requirements, which formed the basis for the design effort, were prepared by Pacific Northwest Laboratory for the US Department of Energy, Richland Operations Office, in the form of a Functional Design Criteria (FDC) document, Rev. 4, August 1985. 9 figs., 6 tabs

  11. Management control system description

    Energy Technology Data Exchange (ETDEWEB)

    Bence, P. J.

    1990-10-01

    This Management Control System (MCS) description describes the processes used to manage the cost and schedule of work performed by Westinghouse Hanford Company (Westinghouse Hanford) for the US Department of Energy, Richland Operations Office (DOE-RL), Richland, Washington. Westinghouse Hanford will maintain and use formal cost and schedule management control systems, as presented in this document, in performing work for the DOE-RL. This MCS description is a controlled document and will be modified or updated as required. This document must be approved by the DOE-RL; thereafter, any significant change will require DOE-RL concurrence. Westinghouse Hanford is the DOE-RL operations and engineering contractor at the Hanford Site. Activities associated with this contract (DE-AC06-87RL10930) include operating existing plant facilities, managing defined projects and programs, and planning future enhancements. This document is designed to comply with Section I-13 of the contract by providing a description of Westinghouse Hanford's cost and schedule control systems used in managing the above activities. 5 refs., 22 figs., 1 tab.

  12. All Conservation Opportunity Areas (ECO.RES.ALL_OP_AREAS)

    Data.gov (United States)

    U.S. Environmental Protection Agency — The All_OP_Areas GIS layer are all the Conservation Opportunity Areas identified by MoRAP (produced for EPA Region 7). They designate areas with potential for...

  13. Health Service Areas (HSAs) - Small Area Estimates

    Science.gov (United States)

    Health Service Areas (HSAs) are a compromise between the 3000 counties and the 50 states. An HSA may be thought of as an area that is relatively self-contained with respect to hospital care and may cross over state boundries.

  14. 2011 Annual Ecological Survey: Pacific Northwest National Laboratory Site

    Energy Technology Data Exchange (ETDEWEB)

    Becker, James M.; Chamness, Michele A.

    2012-02-27

    The U.S. Department of Energy (DOE) Pacific Northwest Site Office (PNSO) oversees and manages the DOE contract for the Pacific Northwest National Laboratory (PNNL), a DOE Office of Science multi-program laboratory located in Richland, Washington. PNSO is responsible for ensuring that all activities conducted on the PNNL site comply with applicable laws, policies, and DOE Orders. The DOE Pacific Northwest Site Office Cultural and Biological Resources Management Plan (DOE/PNSO 2008) addresses the requirement for annual surveys and monitoring for species of concern and to identify and map invasive species. In addition to the requirement for an annual survey, proposed project activities must be reviewed to assess any potential environmental consequences of conducting the project. The assessment process requires a thorough understanding of the resources present, the potential impacts of a proposed action to those resources, and the ultimate consequences of those actions. The PNNL site is situated on the southeastern corner of the DOE Hanford Site, located at the north end of the city of Richland in south-central Washington. The site is bordered on the east by the Columbia River, on the west by Stevens Drive, and on the north by the Hanford Site 300 Area (Figure 1). The environmental setting of the PNNL site is described in Larson and Downs (2009). There are currently two facilities on the PNNL site: the William R. Wiley Environmental Molecular Sciences Laboratory and the Physical Sciences Facility. This report describes the annual survey of biological resources found on the undeveloped upland portions of the PNNL site. The annual survey is comprised of a series of individual field surveys conducted on various days in late May and throughout June 2011. A brief description of the methods PNNL ecologists used to conduct the baseline surveys and a summary of the results of the surveys are presented. Appendix A provides a list of plant and animal species identified in the

  15. Hanford Diversification and the Tri-Cities Economy FY 1999

    Energy Technology Data Exchange (ETDEWEB)

    SCOTT, M.J.

    2000-06-05

    The missions of the U.S. Department of Energy's Richland Operations Office (DOE/RL) are to safely manage the Hanford Site, to manage and clean up its legacy wastes, and to develop and deploy new science and technology in the environmental and energy fields. Collectively, DOE/RL and its contractors are the most important single entity in the Tri-Cities local economy (Pasco, Kennewick, and Richland, Washington, and the surrounding area). Although the relevant economic region affected by DOE/RL and its contractors actually embraces a geographic area reaching from Yakima in the west to Walla Walla in the east and from Moses Lake in the north to Pendleton, Oregon, in the south, over 90% of economic impacts likely occur in Benton and Franklin Counties. These two counties are defined as the ''local'' Tri-Cities economy for purposes of this study. In the federal fiscal year (FY) 1999 (October 1, 1998 through September 30, 1999), the total impact of DOE'S local $1.59 billion budget was felt through payrolls of $542 million and local purchases of goods and services of $226 million. The total local spending of $768 million was up slightly from the FY 1998 total of $765 million. Taking into account the multiplier effects of this spending, the DOE/RL budget sustained an estimated 32% of all local employment (28,250 out of 88,100 jobs) and about 35% of local earned income (almost $1.08 billion out of $3.08 billion). The decrease in these percentages from last year's report reflects an update of the model's economic structure based on the 1997 economic census year, a correction of a programming error in the model found during the update, and a broader definition of earnings that includes proprietor income, not just wages (see the Appendix for revisions to the previous forecasts). DOE budget increases in FY 2000 are expected to result in no change to the number of local DOE contractor jobs and about a $29 million increase in direct local

  16. Proposed plan for interim remedial measures at the 100-HR-1 Operable Unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1995-01-01

    This proposed plan identifies the preferred alternative for interim remedial measures for remedial action of radioactive liquid waste disposal sites at the 100-HR-1 Operable Unit, located at the Hanford Site. It also summarizes other remedial alternatives evaluated for interim remedial measures in this operable unit. The intent of interim remedial measures is to speed up actions to address contaminated areas that historically received radioactive liquid waste discharges that pose a potential threat to human health and the environment. This proposed plan is being issued by the Washington State Department of Ecology (Ecology), the lead regulatory agency; the US Environmental Protection Agency (EPA), the support regulatory agency; and the US Department of Energy (DOE), the responsible agency. Ecology, EPA, and DOE are issuing this proposed plan as part of their public participation responsibilities under Section 117(a) of the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA), commonly known as the ''Superfund Program.'' The proposed plan is intended to be a fact sheet for public review that (1) briefly describes the remedial alternatives analyzed; (2) proposes a preferred alternative; (3) summarizes the information relied upon to recommend the preferred alternative; and (4) provides a basis for an interim action record of decision (ROD). The preferred alternative presented in this proposed plan is removal, treatment (as appropriate), and disposal of contaminated soil and associated structures. Treatment will be conducted if there is cost benefit

  17. Community-Operated Environmental Surveillance Program

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-06-01

    This section of the 1994 Hanford Site Environmental Report summarizes the environmental surveillance activities with which citizens living near the Hanford Site have been participating. Local teachers have been managing and operating three special radiological air sampling stations located in Richland, Basin City, and Franklin County, Washington. Other expansion efforts of this program are also described.

  18. First generation long-reach manipulator for retrieval of waste from Hanford single-shell tanks

    International Nuclear Information System (INIS)

    Gibbons, P.W.; McDaniel, L.B.

    1994-10-01

    The US Department of Energy, Richland Operations Office, has established the Tank Waste Remediation System to resolve environmental and safety issues related to underground waste-storage tanks at the Hanford Site. The Tank Waste Remediation System has identified the use of an advanced-technology, long-reach manipulator system as a low-water-addition retrieval alternative to past-practice sluicing

  19. Minutes of the Tank Waste Science Panel meeting, November 11--13, 1991. Hanford Tank Safety Project

    Energy Technology Data Exchange (ETDEWEB)

    Strachan, D.M. [comp.

    1992-04-01

    The sixth meeting of the Tank Waste Science Panel was held November 11--13, 1991, in Pasco and Richland, Washington. Participating scientists presented the results of recent work on various aspects of issues relating to the generation and release of gases from Tank 241-SY-101 and the presence of ferrocyanide in other tanks at Hanford. Results are discussed.

  20. Minutes of the Tank Waste Science Panel meeting, November 11--13, 1991

    Energy Technology Data Exchange (ETDEWEB)

    Strachan, D.M. (comp.)

    1992-04-01

    The sixth meeting of the Tank Waste Science Panel was held November 11--13, 1991, in Pasco and Richland, Washington. Participating scientists presented the results of recent work on various aspects of issues relating to the generation and release of gases from Tank 241-SY-101 and the presence of ferrocyanide in other tanks at Hanford. Results are discussed.

  1. Minutes of the Tank Waste Science Panel meeting, November 11--13, 1991

    International Nuclear Information System (INIS)

    Strachan, D.M.

    1992-04-01

    The sixth meeting of the Tank Waste Science Panel was held November 11--13, 1991, in Pasco and Richland, Washington. Participating scientists presented the results of recent work on various aspects of issues relating to the generation and release of gases from Tank 241-SY-101 and the presence of ferrocyanide in other tanks at Hanford. Results are discussed

  2. Nuclear science

    International Nuclear Information System (INIS)

    1989-01-01

    This fact sheet answers specific questions about the Department of Energy's possible acquisition and conversion of a partially completed commercial nuclear power plant to a nuclear materials production facility. The nuclear power plant is the Washington Nuclear Plant number sign 1 owned by the Washington Public Power Supply System and is located on DOE's Hanford Reservation near Richland, Washington

  3. Nuclear science

    International Nuclear Information System (INIS)

    1989-04-01

    This report answers questions about the Department of Energy's possible acquisition and conversion of a partially completed commercial nuclear power plant to a nuclear materials production facility. The nuclear power plant is the Washington Nuclear Plant No.1 owned by the Washington Public Power Supply System and is located on DOE's Hanford Reservation near Richland, Washington

  4. Rock the Watt: An Energy Conservation Campaign at Pacific Northwest National Lab

    Energy Technology Data Exchange (ETDEWEB)

    None

    2016-01-01

    Case study describes Pacific Northwest National Laboratory's (PNNL) three-month Rock the Watt campaign to reduce energy use at its main campus in Richland, Washington. The campaign objectives were to educate PNNL employees about energy conservation opportunities in their workplace and to motivate them to help PNNL save energy and costs and to reduce greenhouse gas emissions.

  5. Community-Operated Environmental Surveillance Program

    International Nuclear Information System (INIS)

    Anon.

    1995-01-01

    This section of the 1994 Hanford Site Environmental Report summarizes the environmental surveillance activities with which citizens living near the Hanford Site have been participating. Local teachers have been managing and operating three special radiological air sampling stations located in Richland, Basin City, and Franklin County, Washington. Other expansion efforts of this program are also described

  6. AE monitoring simplified using digital memory storage and source isolation

    International Nuclear Information System (INIS)

    Hutton, P.H.; Skorpik, J.R.

    1977-01-01

    The general trend in acoustic emission (AE) monitoring systems has been one of increasing complexity. This is particularly true in systems for continuous monitoring which are usually multichannel (perhaps 20 to 40) and incorporate a dedicated minicomputer. A unique concept which reverses this trend for selected applications has been developed at Battelle-Northwest, Richland, WA. This concept uses solid state digital memories to store acquired data in a permanent form which is easily retrieved. It also uses a fundamental method to accept AE data only from a selected area. The digital memory system is designed for short term or long term (months) monitoring. It has been successfully applied in laboratory testing such as fatigue crack growth studies, as well as field monitoring on bridges and piping to detect crack growth. The features of simplicity, versatility, and low cost contribute to expanded practical application of acoustic emission technology

  7. Temporary septic holding tank at the 300-FF-1 remedial action central support facility -- Engineering report

    International Nuclear Information System (INIS)

    Jackson, G.J.

    1996-09-01

    The 300-FF-1 Remedial Action Support Facility will be required in the 300 Area (at the Hanford Site in Richland, Washington) to support the remedial actions planned for the 300-FF-1 Operable Unit. In conjunction with this project, soils laden with radiological contamination will be excavated, removed, and transported to a permitted disposal facility, if required based upon characterization. This facility will be a temporary, modular building sized to provide office and work space for the supervisors, engineers, and technicians assigned to the project and engaged in the associated field work. Electrical and potable water service to the 300-FF-1 Support Facility will be provided via permanent connections to existing systems. A temporary septic system is desired as opposed to connecting to the existing sewer system due to regulatory issues. The paper describes the project location, geology and flooding potential, design criteria, operations, and maintenance

  8. 5 CFR 591.207 - Which areas are COLA areas?

    Science.gov (United States)

    2010-01-01

    ... 5 Administrative Personnel 1 2010-01-01 2010-01-01 false Which areas are COLA areas? 591.207 Section 591.207 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS ALLOWANCES AND DIFFERENTIALS Cost-of-Living Allowance and Post Differential-Nonforeign Areas Cost-Of-Living...

  9. RCRA facility investigation/corrective measures study work plan for the 200-UP-2 Operable Unit, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1993-06-01

    The 200-UP-2 Operable Unit is one of two source operable units at the U Plant Aggregate Area at the Hanford Site. Source operable units include waste management units and unplanned release sites that are potential sources of radioactive and/or hazardous substance contamination. This work plan, while maintaining the title RFI/CMS, presents the background and direction for conducting a limited field investigation in the 200-UP-2 Operable Unit, which is the first part of the process leading to final remedy selection. This report discusses the background, prior recommendations, goals, organization, and quality assurance for the 200-UP-2 Operable Unit Work Plan. The discussion begins with a summary of the regulatory framework and the role of the work plan. The specific recommendations leading into the work plan are then addressed. Next, the goals and organization of the report are discussed. Finally, the quality assurance and supporting documentation are presented

  10. Class 1 Areas

    Data.gov (United States)

    U.S. Environmental Protection Agency — A "Class 1" area is a geographic area recognized by the EPA as being of the highest environmental quality and requiring maximum protection. Class I areas are areas...

  11. Living in Prone Flooding Area: in Coastal Areas of Semarang

    Science.gov (United States)

    Tyas, W. P.

    2018-02-01

    When settlements are not able to provide a comfort area to live in, in this case because of a periodic threat of tidal flood coming to certain settlement areas, it is likely that the people still cannot leave the area. This paper explores the leading factors of the attachment of people to the areas, from economic, physical, social and psychological factors, including a place attachment. Therefore, the approach of the problem solution to tackle the tidal flooding in the areas should be also concern and have considerations relate to the factors.

  12. Financial system loss as an example of high consequence, high frequency events

    Energy Technology Data Exchange (ETDEWEB)

    McGovern, D.E.

    1996-07-01

    Much work has been devoted to high consequence events with low frequency of occurrence. Characteristic of these events are bridge failure (such as that of the Tacoma Narrows), building failure (such as the collapse of a walkway at a Kansas City hotel), or compromise of a major chemical containment system (such as at Bhopal, India). Such events, although rare, have an extreme personal, societal, and financial impact. An interesting variation is demonstrated by financial losses due to fraud and abuse in the money management system. The impact can be huge, entailing very high aggregate costs, but these are a result of the contribution of many small attacks and not the result of a single (or few) massive events. Public awareness is raised through publicized events such as the junk bond fraud perpetrated by Milikin or gross mismanagement in the failure of the Barings Bank through unsupervised trading activities by Leeson in Singapore. These event,s although seemingly large (financial losses may be on the order of several billion dollars), are but small contributors to the estimated $114 billion loss to all types of financial fraud in 1993. This paper explores the magnitude of financial system losses and identifies new areas for analysis of high consequence events including the potential effect of malevolent intent.

  13. Selection of material balance areas and item control areas

    International Nuclear Information System (INIS)

    1975-04-01

    Section 70.58, ''Fundamental Nuclear Material Controls,'' of 10 CFR Part 70, ''Special Nuclear Material,'' requires certain licensees authorized to possess more than one effective kilogram of special nuclear material to establish Material Balance Areas (MBAs) or Item Control Areas (ICAs) for the physical and administrative control of nuclear materials. This section requires that: (1) each MBA be an identifiable physical area such that the quantity of nuclear material being moved into or out of the MBA is represented by a measured value; (2) the number of MBAs be sufficient to localize nuclear material losses or thefts and identify the mechanisms; (3) the custody of all nuclear material within an MBA or ICA be the responsibility of a single designated individual; and (4) ICAs be established according to the same criteria as MBAs except that control into and out of such areas would be by item identity and count for previously determined special nuclear material quantities, the validity of which must be ensured by tamper-safing unless the items are sealed sources. This guide describes bases acceptable to the NRC staff for the selection of material balance areas and item control areas. (U.S.)

  14. 200-BP-11 operable unit and 216-B-3 main pond work/closure plan, Hanford Site, Richland, Washington. Volume 1: Field investigation and sampling strategy

    International Nuclear Information System (INIS)

    1994-09-01

    This document coordinates a Resource Conservation and Recovery Act (RCRA) past-practice work plan for the 200-BP-11 Operable Unit and a RCRA closure/postclosure plan for the 216-B-3 Main Pond and 216-B-3-3 Ditch [treatment, storage, and/or disposal (TSD) unit]. Both RCRA TSD and past-practice waste management units are contained within the 200-BP-11 Operable Unit. The 200-BP-11 Operable Unit is a source operable unit located on the east side of the B Plant Source Aggregate Area in the 200 East Area of the Hanford Site. The operable unit lies just east of the 200 East Area perimeter fence and encompass approximately 476 hectares (1,175 acres). Source operable units include waste management units that are potential sources of radioactive and/or hazardous substance contamination. Source waste management units are categorized in the Hanford Federal Facility Agreement and Consent Order as either RCRA TSD, RCRA past-practice, or Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) past-practice. As listed below and in the Tri-Party Agreement, the 200-BP-11 Operable Unit contains five RCRA past-practice and five RCRA TSD waste management units. Additionally, for RCRA TSD permitting purposes, the RCRA TSD waste management units are subdivided into two RCRA TSD units

  15. Fire Hazards Analysis for the 200 Area Interim Storage Area

    International Nuclear Information System (INIS)

    JOHNSON, D.M.

    2000-01-01

    This documents the Fire Hazards Analysis (FHA) for the 200 Area Interim Storage Area. The Interim Storage Cask, Rad-Vault, and NAC-1 Cask are analyzed for fire hazards and the 200 Area Interim Storage Area is assessed according to HNF-PRO-350 and the objectives of DOE Order 5480 7A. This FHA addresses the potential fire hazards associated with the Interim Storage Area (ISA) facility in accordance with the requirements of DOE Order 5480 7A. It is intended to assess the risk from fire to ensure there are no undue fire hazards to site personnel and the public and to ensure property damage potential from fire is within acceptable limits. This FHA will be in the form of a graded approach commensurate with the complexity of the structure or area and the associated fire hazards

  16. Characterization of stored defense production spent nulcear fuel and associated materials at Hanford Site, Richland Washington: Environmental assessment

    International Nuclear Information System (INIS)

    1995-03-01

    There are about 2,100 tonnes (2,300 tons) of defense production spent nuclear fuel stored in the 100-K Area Basins located along the south shore of the Columbia River in the northern part of the Hanford Site. Some of the fuel which has been in storage for a number of years is in poor condition and continues to deteriorate. The basins also contain fuel fragments and radioactively contaminated sludge. The DOE needs to characterize defense production spent nuclear fuel and associated materials stored on the Hanford Site. In order to satisfy that need, the Department of Energy (DOE) proposes to select, collect and transport samples of spent nuclear fuel and associated materials to the 327 Building for characterization. As a result of that characterization, modes of interim storage can be determined that would be compatible with the material in its present state and alternative treatment processes could be developed to permit a broader selection of storage modes. Environmental impacts of the proposed action were determined to be limited principally to radiation exposure of workers, which, however, were found to be small. No health effects among workers or the general public would be expected under routine operations. Implementation of the proposed action would not result in any impacts on cultural resources, threatened, endangered and candidate species, air or water quality, socioeconomic conditions, or waste management

  17. [Syntactic Processing in Broca's Area: Brodmann Areas 44 and 45].

    Science.gov (United States)

    Yamada, Atora; Sakai, Kuniyoshi L

    2017-04-01

    Brodmann areas 44 and 45 are known as Broca's area; however, their true functional roles are still unknown. Recent developments in neuroimaging techniques revealed the structures and functions of Broca's area in detail. More specifically regarding language functions, sufficient evidence has been accumulated that this region subserves the center of syntactic processing, not necessarily motor functions. Here, we review a role of Broca's area as the grammar center, including other roles in nonlinguistic functions.

  18. Explosion of cation exchange column in americium recovery service, Hanford plant, August 30, 1976

    International Nuclear Information System (INIS)

    1976-01-01

    This document is a collection of thirty references related to the explosion of the cation exchange column in the Americium Recovery Service of the Hanford Atomic Products Operation, Richland, Washington, on August 30, 1976. Some of the documents are related to the design and safety studies, while others refer to the accident and resulting decontamination efforts, investigations, and legal consequences

  19. Advanced Chemical Measurements of Smoke from DoD-prescribed Burns

    Science.gov (United States)

    2014-04-01

    Identification and Emission Factors of Molecular Tracers in Organic Aerosols from Biomass Burning Part 2. Deciduous Trees , Applied Geochemistry, 16, 1545-1565...National Interagency Fire Center, Boise, ID., 97 p.. Ottmar, R.D., and Sandberg, D.V. 2001. “Wildland Fire in Eastern Oregon and Washington ...Research and Development Program (SERDP) as Project RC-1649 Pacific Northwest National Laboratory Richland, Washington 99352 REPORT

  20. 1995 Phase 1 concrete sampling at the decontaminated 183-H basins

    International Nuclear Information System (INIS)

    Kramer, C.D.

    1996-01-01

    This report provides a consolidated reference for 1995 concrete sampling data associated with the Hanford Site's 183-H Solar Evaporation Basins (located at the Hanford Site in Richland, Washington). In 1995, the basins were decontaminated and dismantled. Sampling efforts began after completion of concrete decontamination efforts. Soil and water samples were collected and are described in chronological order in this report

  1. Site Specific Waste Management Instruction for the 116-F-4 soil storage unit

    International Nuclear Information System (INIS)

    Hopkins, G.G.

    1996-08-01

    This Site Specific Waste Management Instruction provides guidance for management of waste generated during the excavation and remediation of soil and debris from the 116-4 soil storage unit located at the Hanford Site in Richland, Washington. This document outlines the waste management practices that will be performed in the field to implement federal, state, and US Department of Energy requirements

  2. AFLOWLIB.ORG: a Distributed Materials Properties Repository from High-throughput Ab initio Calculations

    Science.gov (United States)

    2011-11-15

    9001, Beer -Sheva, 84190, Israel † Present address: Pacific Northwest National Laboratory, Richland, WA 99354. ‡ Present address: Department of Physics...919 660 8963 Abstract Empirical databases of crystal structures and thermodynamic properties are fundamental tools for materials research. Recent...contains over 150,000 thermodynamic entries for alloys, covering the entire composition range of more than 650 binary systems, 13,000 electronic

  3. Geohydrological studies for nuclear waste isolation at the Hanford Reservation. Volume I. Executive summary

    International Nuclear Information System (INIS)

    Apps, J.; Doe, T.; Doty, B.

    1979-08-01

    A study of the hydrology of the Pasco Basin near Richland, Washington, was initiated during FY 1978 as part of a long-term study on the feasibility of nuclear waste disposal in the Columbia River Basalt underlying the Hanford Reservation. This report summarizes the hydrology field program, Pasco Basin modeling, and groundwater chemistry program. Hanford well logs are also reviewed

  4. Full-wave Ambient Noise Tomography of Mt Rainier volcano, USA

    Science.gov (United States)

    Flinders, Ashton; Shen, Yang

    2015-04-01

    Mount Rainier towers over the landscape of western Washington (USA), ranking with Fuji-yama in Japan, Mt Pinatubo in the Philippines, and Mt Vesuvius in Italy, as one of the great stratovolcanoes of the world. Notwithstanding its picturesque stature, Mt Rainier is potentially the most devastating stratovolcano in North America, with more than 3.5 million people living beneath is shadow in the Seattle-Tacoma area. The primary hazard posed by the volcano is in the form of highly destructive debris flows (lahars). These lahars form when water and/or melted ice erode away and entrain preexisting volcanic sediment. At Mt Rainier these flows are often initiated by sector collapse of the volcano's hydrothermally rotten flanks and compounded by Mt Rainier's extensive snow and glacial ice coverage. It is therefore imperative to ascertain the extent of the volcano's summit hydrothermal alteration, and determine areas prone to collapse. Despite being one of the sixteen volcanoes globally designated by the International Association of Volcanology and Chemistry of the Earth's Interior as warranting detailed and focused study, Mt Rainier remains enigmatic both in terms of the shallow internal structure and the degree of summit hydrothermal alteration. We image this shallow internal structure and areas of possible summit alteration using ambient noise tomography. Our full waveform forward modeling includes high-resolution topography allowing us to accuratly account for the effects of topography on the propagation of short-period Rayleigh waves. Empirical Green's functions were extracted from 80 stations within 200 km of Mt Rainier, and compared with synthetic greens functions over multiple frequency bands from 2-28 seconds.

  5. Climate influences the leaf area/sapwood area ratio in Scots pine.

    Science.gov (United States)

    Mencuccini, M; Grace, J

    1995-01-01

    We tested the hypothesis that the leaf area/sapwood area ratio in Scots pine (Pinus sylvestris L.) is influenced by site differences in water vapor pressure deficit of the air (D). Two stands of the same provenance were selected, one in western Scotland and one in eastern England, so that effects resulting from age, genetic variability, density and fertility were minimized. Compared with the Scots pine trees at the cooler and wetter site in Scotland, the trees at the warmer and drier site in England produced less leaf area per unit of conducting sapwood area both at a stem height of 1.3 m and at the base of the live crown, whereas stem permeability was similar at both sites. Also, trees at the drier site had less leaf area per unit branch cross-sectional area at the branch base than trees at the wetter site. For each site, the average values for leaf area, sapwood area and permeability were used, together with values of transpiration rates at different D, to calculate average stem water potential gradients. Changes in the leaf area/sapwood area ratio acted to maintain a similar water potential gradient in the stems of trees at both sites despite climatic differences between the sites.

  6. FHFA Underserved Areas

    Data.gov (United States)

    Department of Housing and Urban Development — Federal Housing Finance Agency's (FHFA) Underserved Areas establishes underserved area designations for census tracts in Metropolitan Areas (MSAs), nonmetropolitan...

  7. Environmental Management Performance Report March 2000

    International Nuclear Information System (INIS)

    EDER, D.M.

    2000-01-01

    The purpose of this report is to provide the Department of Energy Richland Operations Office (DOE-RL) a report of the Project Hanford Management Contractors' (PHMC) Environmental Management (EM) performance by Fluor Hanford (FH) and its subcontractors. This report is a monthly publication that summarizes the PHMC EM performance. In addition, it includes some PHMC-level data not detailed elsewhere in the report. Section A, Executive Summary, provides an executive level summary of the cost, schedule, and technical performance described in this report. It summarizes performance for the period covered, highlights areas worthy of management attention, and provides a forward look to some of the upcoming key performance activities as extracted from the PHMC baseline. The remaining sections provide detailed performance data relative to each individual mission area (e.g., Waste Management, Spent Nuclear fuels , etc.), in support of Section A of the report. A glossary of terms is provided at the end of this report for reference purposes. Unless otherwise noted, the Safety, Conduct of Operations, and Cost/schedule data contained herein is as of January 31, 2000. All other information is as of March 1, 2000

  8. Environmental Management Performance Report March 2000

    Energy Technology Data Exchange (ETDEWEB)

    EDER, D.M.

    2000-03-16

    The purpose of this report is to provide the Department of Energy Richland Operations Office (DOE-RL) a report of the Project Hanford Management Contractors' (PHMC) Environmental Management (EM) performance by Fluor Hanford (FH) and its subcontractors. This report is a monthly publication that summarizes the PHMC EM performance. In addition, it includes some PHMC-level data not detailed elsewhere in the report. Section A, Executive Summary, provides an executive level summary of the cost, schedule, and technical performance described in this report. It summarizes performance for the period covered, highlights areas worthy of management attention, and provides a forward look to some of the upcoming key performance activities as extracted from the PHMC baseline. The remaining sections provide detailed performance data relative to each individual mission area (e.g., Waste Management, Spent Nuclear fuels , etc.), in support of Section A of the report. A glossary of terms is provided at the end of this report for reference purposes. Unless otherwise noted, the Safety, Conduct of Operations, and Cost/schedule data contained herein is as of January 31, 2000. All other information is as of March 1, 2000.

  9. Environmental Management Performance Report to DOE-RL September 2001

    International Nuclear Information System (INIS)

    EDER, D.M.

    2001-01-01

    The purpose of this report is to provide the Department of Energy Richland Operations Office (RL) a monthly summary of the Central Plateau Contractor's Environmental Management (EM) performance by Fluor Hanford (FH) and its subcontractors. Section A, Executive Summary, provides an executive level summary of the cost, schedule, and technical performance described in this report. It summarizes performance for the period covered, highlights areas worthy of management attention, and provides a forward look to some of the upcoming key performance activities as extracted from the contractor baseline. The remaining sections provide detailed performance data relative to each individual Project (e.g., Waste Management, Spent Nuclear Fuels, etc.), in support of Section A of the report. Unless otherwise noted, the Safety, Conduct of Operations, and Cost/Schedule data contained herein is as of July 31, 2001. All other information is updated as of August 22, 2001 unless otherwise noted. ''Stoplight'' boxes are used to indicate at a glance the condition of a particular area. Green boxes denote on schedule. Yellows denote behind schedule but recoverable. Red is either missed or unrecoverable, without agreement by the regulating party

  10. Water Service Areas - Public Water Supplier's (PWS) Service Areas

    Data.gov (United States)

    NSGIC Education | GIS Inventory — Boundaries of current public water supplier's (PWS) service areas. This data set contains the present service area boundary of the water system and does not contain...

  11. Anchorage Areas

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — An anchorage area is a place where boats and ships can safely drop anchor. These areas are created in navigable waterways when ships and vessels require them for...

  12. Solar heating, cooling, and hot water systems installed at Richland, Washington

    Science.gov (United States)

    1979-01-01

    The project described is part of the U. S. Department of Energy's solar demonstration program, and became operational in April 1978. The solar system uses 6,000 square feet of flat-plate liquid collectors in a closed loop to deliver solar energy through a liquid-liquid heat exchanger to the building heat-pump duct work or 9,000-gallon thermal energy storage tank. A 25-ton Arkla solar-driven absorption chiller provides the cooling, in conjunction with a 2,000 gallon chilled water storage tank and reflective ponds on three sides of the building surplus heat. A near-by building is essentially identical except for having conventional heat-pump heating and cooling, and can serve as an experimental control. An on-going public relations program was provided from the beginning of the program, and resulted in numerous visitors and tour groups.

  13. Applying Lean Concepts to Waste Site Closure - 13137

    International Nuclear Information System (INIS)

    Proctor, M.L.

    2013-01-01

    Washington Closure Hanford (WCH) was selected by the U.S. Department of Energy, Richland Operations Office to manage the River Corridor Closure Project, a 10-year contract in which WCH will clean up 220 mi 2 of contaminated land at the Hanford Site in Richland, Washington. In the summer of 2011, with Tri-Party (DOE-RL, Environmental Protection Agency and Washington State Department of Ecology) Agreement Milestones due at the end of the calendar year, standard work practices were challenged in regards to closure documentation development. The Lean process, a concept that maximizes customer value while minimizing waste, was introduced to WCH's Sample Design and Cleanup Verification organization with the intention of eliminating waste and maximizing efficiencies. The outcome of implementing Lean processes and concepts was impressive. It was determined that the number of non-value added steps far outnumbered the value added steps. Internal processing time, document size, and review times were all reduced significantly; relationships with the customer and the regulators were also improved; and collaborative working relationships with the Tri Parties have been strengthened by working together on Lean initiatives. (authors)

  14. International training course on implementation of state systems of accounting for and control of nuclear materials: proceedings

    International Nuclear Information System (INIS)

    1984-06-01

    This report incorporates all lectures and presentations at the International Training Course on Implementation of State Systems of Accounting for and Control of Nuclear Materials held October 17 through November 4, 1983, at Santa Fe and Los Alamos, New Mexico and Richland, Washington, USA. Authorized by the US Nuclear Non-Proliferation Act and sponsored by the US Department of Energy in cooperation with the International Atomic Energy Agency, the course was developed to provide practical training in the design, implementation, and operation of a State system of nuclear materials accountability and control that satisfies both national and international safeguards requirements. Major emphasis for the 1983 course was placed on safeguards methods used at bulk-handling facilities, particularly low-enriched uranium conversion and fuel fabrication plants. The course was conducted by the University of California's Los Alamos National Laboratory and Exxon Nuclear Company, Inc. Tours and demonstrations were arranged at the Los Alamos National Laboratory, Los Alamos, New Mexico, and the Exxon Nuclear fuel fabrication plant, the Battelle Pacific Northwest Laboratory, Westinghouse Fast Flux Test Facility Visitor Center, and Washington Public Power System nuclear reactor facilities in Richland, Washington. Individual presentations were indexed for inclusion in the Energy Data Base

  15. Site closure and perpetual care of a low-level radioactive waste disposal facility in semi-arid climate

    International Nuclear Information System (INIS)

    Singh, P.N.; Breeden, K.H.; Hana, S.L.A.

    1988-01-01

    A study has been performed on site closure and perpetual care and maintenance requirements for the commercially operated low-level radioactive waste (LLRW) disposal facility, referred to as the Richland Facility, on the Hanford Reservation near Richland, Washington. The study included a site assessment and identification and formulation of site specific design elements for closure and perpetual care and maintenance. This paper summarizes the observations, findings and conclusions resulting from Phase I of this study. Three release mechanisms and four destructive processes are considered in the conceptual closure design process. The release mechanisms considered include subsurface liquid movement, biological transport of wastes to the surface and subsurface gas movement. The destructive processes considered are wind erosion, biological penetration or damage of cover, vegetation destroying processes and subsidence and seismic activity. The closure design elements were developed with several key principles in mind. The primary goals were to prevent intrusion into, or exposure of, the waste; to prevent or minimize release from the trenches; to provide early warning of any release that should occur; and to provide definitive information as to whether or not any observed environmental contamination actually originated from the facility

  16. Applying Lean Concepts to Waste Site Closure - 13137

    Energy Technology Data Exchange (ETDEWEB)

    Proctor, M.L. [Washington Closure Hanford, 2620 Fermi, Richland, Washington 99354 (United States)

    2013-07-01

    Washington Closure Hanford (WCH) was selected by the U.S. Department of Energy, Richland Operations Office to manage the River Corridor Closure Project, a 10-year contract in which WCH will clean up 220 mi{sup 2} of contaminated land at the Hanford Site in Richland, Washington. In the summer of 2011, with Tri-Party (DOE-RL, Environmental Protection Agency and Washington State Department of Ecology) Agreement Milestones due at the end of the calendar year, standard work practices were challenged in regards to closure documentation development. The Lean process, a concept that maximizes customer value while minimizing waste, was introduced to WCH's Sample Design and Cleanup Verification organization with the intention of eliminating waste and maximizing efficiencies. The outcome of implementing Lean processes and concepts was impressive. It was determined that the number of non-value added steps far outnumbered the value added steps. Internal processing time, document size, and review times were all reduced significantly; relationships with the customer and the regulators were also improved; and collaborative working relationships with the Tri Parties have been strengthened by working together on Lean initiatives. (authors)

  17. Hanford Site radionuclide national emission standards for hazardous air pollutants unregistered stack (power exhaust) source assessment

    International Nuclear Information System (INIS)

    Davis, W.E.

    1994-01-01

    On February 3, 1993, the US Department of Energy, Richland Operations Office received a Compliance Order and Information Request from the Director of the Air and Toxics Division of the US Environmental Protection Agency, Region 10. The Compliance Order requires the Richland Operations Office to evaluate all radionuclide emission points at the Hanford Site to determine which are subject to continuous emission measurement requirements in 40 Code of Federal Regulations (CFR) 61, Subpart H, and to continuously measure radionuclide emissions in accordance with 40 CFR 61.93. This evaluation provides an assessment of the 39 unregistered stacks, under Westinghouse Hanford Company's management, and their potential radionuclide emissions, i.e., emissions with no control devices in place. The evaluation also determined if the effective dose equivalent from any of these stack emissions exceeded 0.1 mrem/yr, which will require the stack to have continuous monitoring. The result of this assessment identified three stacks, 107-N, 296-P-26 and 296-P-28, as having potential emissions that would cause an effective dose equivalent greater than 0.1 mrem/yr. These stacks, as noted by 40 CFR 61.93, would require continuous monitoring

  18. What Do Managers Really Want?

    International Nuclear Information System (INIS)

    Haberstok, J.K.

    1997-01-01

    Fluor Daniel Hanford, Inc. (FDH) is the Management Contractor for the Project Hanford Management Contract for the Department of Energy - Richland Operations Office. The Central Training Organization within FDH provides cross-cutting training services for its own personnel as well as for six subcontractors and six enterprise companies performing project work across the 560 square miles of the Hanford Site near Richland, Washington. Manager Safety Training has been presented by the Environmental, Safety and Health Training (ES and HT) team to managers, supervisors, team leads, and other personnel across the Hanford Site for over four years. The training is intended to heighten the awareness of management toward both identified (via accident/injury reports) and potential safety issues and concerns. Managers need to be aware of their responsibilities and to know where to go/who to contact (for example, company manuals or facility safety representatives) for additional information. At the conclusion of each training session, students are asked to complete a Level I evaluation (Kirkpatrick Model, see sidebar) and this feedback is reviewed by the instructors Commonly, revisions to the course content and presentation format are made solely by the ES and HT instructors and their manager each year

  19. Environmental Restoration Remedial Action quality assurance requirements document

    International Nuclear Information System (INIS)

    1991-01-01

    This document defines the quality assurance requirements for the US Department of Energy-Richland Operations Office Environmental Restoration Remedial Action program at the Hanford Site. The Environmental Restoration Remedial Action program implements significant commitments made by the US Department of Energy in the Hanford Federal Facility Agreement and Consent Order entered into with the Washington State Department of Ecology and the US Environmental Protection Agency. This document combines quality assurance requirements from various source documents into one set of requirements for use by the US Department of Energy-Richland Operations Office and other Environmental Restoration Remedial Action program participants. This document will serve as the basis for developing Quality Assurance Program Plans and implementing procedures by the participants. The requirements of this document will be applied to activities affecting quality, using a graded approach based on the importance of the item, service, or activity to the program objectives. The Quality Assurance Program that will be established using this document as the basis, together with other program and technical documents, form an integrated management control system for conducting the Environmental Restoration Remedial Action program activities in a manner that provides safety and protects the environment and public health

  20. Hanford Site radionuclide national emission standards for hazardous air pollutants unregistered stack (power exhaust) source assessment

    Energy Technology Data Exchange (ETDEWEB)

    Davis, W.E.

    1994-08-04

    On February 3, 1993, the US Department of Energy, Richland Operations Office received a Compliance Order and Information Request from the Director of the Air and Toxics Division of the US Environmental Protection Agency, Region 10. The Compliance Order requires the Richland Operations Office to evaluate all radionuclide emission points at the Hanford Site to determine which are subject to continuous emission measurement requirements in 40 Code of Federal Regulations (CFR) 61, Subpart H, and to continuously measure radionuclide emissions in accordance with 40 CFR 61.93. This evaluation provides an assessment of the 39 unregistered stacks, under Westinghouse Hanford Company`s management, and their potential radionuclide emissions, i.e., emissions with no control devices in place. The evaluation also determined if the effective dose equivalent from any of these stack emissions exceeded 0.1 mrem/yr, which will require the stack to have continuous monitoring. The result of this assessment identified three stacks, 107-N, 296-P-26 and 296-P-28, as having potential emissions that would cause an effective dose equivalent greater than 0.1 mrem/yr. These stacks, as noted by 40 CFR 61.93, would require continuous monitoring.