WorldWideScience

Sample records for ratio pr schedule

  1. Progressive ratio (PR) schedules and the sipometer: Do they measure wanting, liking, and/or reward? A tribute to Anthony Sclafani and Karen Ackroff.

    Science.gov (United States)

    Kissileff, H R; Herzog, M

    2018-03-01

    This paper honors the contributions made by Anthony (Tony) Sclafani and Karen Ackroff to both the Columbia University Seminar on Appetitive Behavior and to the field of ingestive behavior in general. We review their use of the progressive ratio (PR) licking paradigm, to determine whether the taste of sucrose, independent of its post-ingestive effects, is always positively reinforcing in animals. They demonstrated a monotonic increase in licking as concentration increased, and obtained results identical to those obtained with a lever-pressing paradigm, but licking was easier and more natural than lever pressing. The PR paradigm was translated to evaluate liquid food reward value in humans. An instrument (the sipometer) was devised that initially permitted a few seconds access to small amounts of a sweet beverage as the participants increased the time to obtain it in 3-5-sec increments. The device went through two refinements and currently delivers the reinforcer and measures the pressure exerted to obtain it. The sipometer is compared with other techniques for measuring motivation and reward. The use of the sipometer and the PR method are discussed in relation to the theoretical challenges inherent in measuring motivation and pleasure, from both psychological and behavioral economics perspectives, and why it is or is not important to separate these processes for both theoretical and practical applications. Copyright © 2017 Elsevier Ltd. All rights reserved.

  2. Evaluation of Absolute and Relative Reinforcer Value Using Progressive-Ratio Schedules

    Science.gov (United States)

    Francisco, Monica T.; Borrero, John C.; Sy, Jolene R.

    2008-01-01

    We evaluated behavior exhibited by individuals with developmental disabilities using progressive-ratio (PR) schedules. High- and low-preference stimuli were determined based on the results of a paired-stimulus preference assessment and were evaluated in subsequent reinforcer and PR assessments using concurrent and single schedules of presentation.…

  3. 75 FR 51531 - Proposed Collection; Comment Request for Forms 941, 941-PR, 941-SS, 941-X, 941-X(PR), Schedule B...

    Science.gov (United States)

    2010-08-20

    ... 941, 941-PR, 941- SS, 941-X, 941-X(PR), Schedule B (Form 941), Schedule R (Form 941) and Schedule B (Form 941-PR) AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice and request for comments... comments concerning Forms 941 (Employer's Quarterly Federal Tax Return), 941-PR (Planilla Para La...

  4. 78 FR 47056 - Proposed Collection; Comment Request for Forms 941, 941-PR, 941-SS, 941-X, 941-X(PR), Schedule B...

    Science.gov (United States)

    2013-08-02

    ... 941, 941-PR, 941- SS, 941-X, 941-X(PR), Schedule B (Form 941), Schedule R (Form 941)and Schedule B (Form 941-PR) AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice and request for comments... Forms 941 (Employer's Quarterly Federal Tax Return), 941-PR, 941-SS (Employer's Quarterly Federal Tax...

  5. Second-order schedules of token reinforcement with pigeons: effects of fixed- and variable-ratio exchange schedules.

    Science.gov (United States)

    Foster, T A; Hackenberg, T D; Vaidya, M

    2001-09-01

    Pigeons' key pecks produced food under second-order schedules of token reinforcement, with light-emitting diodes serving as token reinforcers. In Experiment 1, tokens were earned according to a fixed-ratio 50 schedule and were exchanged for food according to either fixed-ratio or variable-ratio exchange schedules, with schedule type varied across conditions. In Experiment 2, schedule type was varied within sessions using a multiple schedule. In one component, tokens were earned according to a fixed-ratio 50 schedule and exchanged according to a variable-ratio schedule. In the other component, tokens were earned according to a variable-ratio 50 schedule and exchanged according to a fixed-ratio schedule. In both experiments, the number of responses per exchange was varied parametrically across conditions, ranging from 50 to 400 responses. Response rates decreased systematically with increases in the fixed-ratio exchange schedules, but were much less affected by changes in the variable-ratio exchange schedules. Response rates were consistently higher under variable-ratio exchange schedules than tinder comparable fixed-ratio exchange schedules, especially at higher exchange ratios. These response-rate differences were due both to greater pre-ratio pausing and to lower local rates tinder the fixed-ratio exchange schedules. Local response rates increased with proximity to food under the higher fixed-ratio exchange schedules, indicative of discriminative control by the tokens.

  6. A theory of behaviour on progressive ratio schedules, with applications in behavioural pharmacology.

    Science.gov (United States)

    Bradshaw, C M; Killeen, P R

    2012-08-01

    Mathematical principles of reinforcement (MPR) provide the theoretical basis for a family of models of schedule-controlled behaviour. A model of fixed-ratio schedule performance that was applied to behaviour on progressive ratio (PR) schedules showed systematic departures from the data. This study aims to derive a new model from MPR that will account for overall and running response rates in the component ratios of PR schedules, and their decline toward 0, the breakpoint. The role of pausing is represented in a real-time model containing four parameters: T (0) and k are the intercept and slope of the linear relation between post-reinforcement pause duration and the prior inter-reinforcer interval; a (specific activation) measures the incentive value of the reinforcer; δ (response time) sets biomechanical limits on response rate. Running rate is predicted to decrease with negative acceleration as ratio size increments, overall rate to increase and then decrease. Differences due to type of progression are explained as hysteresis in the control by reinforcement rates. Re-analysis of extant data focuses on the effects of acute treatment with antipsychotic drugs, lesions of the nucleus accumbens core, and destruction of orexinergic neurones of the lateral hypothalamus. The new model resolves some anomalies evident in earlier analyses, and provides new insights to the results of these interventions. Because they can render biologically relevant parameters, mathematical models can provide greater power in interpreting the effects of interventions on the processes underlying schedule-controlled behaviour than is possible for first-order data such as the breakpoint.

  7. An Evaluation of the Value of Choice-Making Opportunities in Single-Operant Arrangements: Simple Fixed- and Progressive-Ratio Schedules

    Science.gov (United States)

    Tiger, Jeffrey H.; Toussaint, Karen A.; Roath, Christopher T.

    2010-01-01

    The current study compared the effects of choice and no-choice reinforcement conditions on the task responding of 3 children with autism across 2 single-operant paradigm reinforcer assessments. The first assessment employed simple fixed-ratio (FR) schedules; the second used progressive-ratio (PR) schedules. The latter assessment identified the…

  8. Concurrent progressive-ratio schedules: built-in controls in the study of delayed reward efficacy.

    Science.gov (United States)

    Jarmolowicz, David P; Hudnall, Jennifer L

    2014-08-15

    Delayed rewards maintain lower rates of operant responding than immediate rewards, and when given a choice between immediate and delayed rewards, individuals typically choose the immediate reward, even when it is smaller (a phenomenon called delay discounting). The behavioral and neural mechanisms underlying these behavioral patterns, however, are not conclusively understood. The present study developed a method to examine the efficacy of delayed rewards in a way that is suitable for pharmacological manipulation of delayed reward efficacy (while controlling for general changes in reward efficacy). The progressive ratio (PR) paradigm often used to examine reward efficacy was modified such that two PR schedules for lever pressing concurrently yet independently were presented. Across a series of conditions, a range of delays (3-81s) were arranged on one of the levers while the reward on the other lever remained immediate. PR breakpoints (the highest ratio completed on each lever, our measure of reward efficacy) systematically decreased on the delayed, but not on the immediate reward lever, suggesting that delays decreased reward efficacy. This decrease in breakpoint resulted in bias in within-session responding that was accounted for by models that adjusted reward value by the delay to that reward. Unlike the standard PR paradigm, the present arrangement provided the controls needed to differentiate delay specific from general changes in reward efficacy. The present method should be helpful in the study of the behavioral and neural mechanisms of delayed reward efficacy. Modifications of the present paradigm should be useful for pharmacological studies. Copyright © 2014 Elsevier B.V. All rights reserved.

  9. Progressive-Ratio Schedules and Applied Behavior Analysis

    Science.gov (United States)

    Poling, Alan

    2010-01-01

    Establishing appropriate relations between the basic and applied areas of behavior analysis has been of long and persistent interest to the author. In this article, the author illustrates that there is a direct relation between how hard an organism will work for access to an object or activity, as indexed by the largest ratio completed under a…

  10. Concurrent variable-interval variable-ratio schedules in a dynamic choice environment.

    Science.gov (United States)

    Bell, Matthew C; Baum, William M

    2017-11-01

    Most studies of operant choice have focused on presenting subjects with a fixed pair of schedules across many experimental sessions. Using these methods, studies of concurrent variable- interval variable-ratio schedules helped to evaluate theories of choice. More recently, a growing literature has focused on dynamic choice behavior. Those dynamic choice studies have analyzed behavior on a number of different time scales using concurrent variable-interval schedules. Following the dynamic choice approach, the present experiment examined performance on concurrent variable-interval variable-ratio schedules in a rapidly changing environment. Our objectives were to compare performance on concurrent variable-interval variable-ratio schedules with extant data on concurrent variable-interval variable-interval schedules using a dynamic choice procedure and to extend earlier work on concurrent variable-interval variable-ratio schedules. We analyzed performances at different time scales, finding strong similarities between concurrent variable-interval variable-interval and concurrent variable-interval variable- ratio performance within dynamic choice procedures. Time-based measures revealed almost identical performance in the two procedures compared with response-based measures, supporting the view that choice is best understood as time allocation. Performance at the smaller time scale of visits accorded with the tendency seen in earlier research toward developing a pattern of strong preference for and long visits to the richer alternative paired with brief "samples" at the leaner alternative ("fix and sample"). © 2017 Society for the Experimental Analysis of Behavior.

  11. Response-rate differences in variable-interval and variable-ratio schedules: An old problem revisited

    OpenAIRE

    Cole, Mark R.

    1994-01-01

    In Experiment 1, a variable-ratio 10 schedule became, successively, a variable-interval schedule with only the minimum interreinforcement intervals yoked to the variable ratio, or a variable-interval schedule with both interreinforcement intervals and reinforced interresponse times yoked to the variable ratio. Response rates in the variable-interval schedule with both interreinforcement interval and reinforced interresponse time yoking fell between the higher rates maintained by the variable-...

  12. On the Correspondence between Preference Assessment Outcomes and Progressive-Ratio Schedule Assessments of Stimulus Value

    Science.gov (United States)

    DeLeon, Iser G.; Frank, Michelle A.; Gregory, Meagan K.; Allman, Melissa J.

    2009-01-01

    The current study examined whether stimuli of different preference levels would be associated with different amounts of work maintained by the stimuli, as determined through progressive-ratio schedule break points. Using a paired-choice preference assessment, stimuli were classified as high, moderate, or low preference for 4 individuals with…

  13. Effect of reinforcer magnitude on performance maintained by progressive-ratio schedules.

    Science.gov (United States)

    Rickard, J F; Body, S; Zhang, Z; Bradshaw, C M; Szabadi, E

    2009-01-01

    This experiment examined the relationship between reinforcer magnitude and quantitative measures of performance on progressive-ratio schedules. Fifteen rats were trained under a progressive-ratio schedule in seven phases of the experiment in which the volume of a 0.6-M sucrose solution reinforcer was varied within the range 6-300 microl. Overall response rates in successive ratios conformed to a bitonic equation derived from Killeen's (1994) Mathematical Principles of Reinforcement. The "specific activation" parameter, a, which is presumed to reflect the incentive value of the reinforcer, was a monotonically increasing function of reinforcer volume; the "response time" parameter, delta, which defines the minimum response time, increased as a function of reinforcer volume; the "currency" parameter, beta, which is presumed to reflect the coupling of responses to the reinforcer, declined as a function of volume. Running response rate (response rate calculated after exclusion of the postreinforcement pause) decayed monotonically as a function of ratio size; the index of curvature of this function increased as a function of reinforcer volume. Postreinforcement pause increased as a function of ratio size. Estimates of a derived from overall response rates and postreinforcement pauses showed a modest positive correlation across conditions and between animals. Implications of the results for the quantification of reinforcer value and for the use of progressive-ratio schedules in behavioral neuroscience are discussed.

  14. Packet-Scheduling Algorithm by the Ratio of Transmit Power to the Transmission Bits in 3GPP LTE Downlink

    Directory of Open Access Journals (Sweden)

    Gil Gye-Tae

    2010-01-01

    Full Text Available Packet scheduler plays the central role in determining the overall performance of the 3GPP long-term evolution (LTE based on packet-switching operation. In this paper, a novel minimum transmit power-based (MP packet-scheduling algorithm is proposed that can achieve power-efficient transmission to the UEs while providing both system throughput gain and fairness improvement. The proposed algorithm is based on a new scheduling metric focusing on the ratio of the transmit power per bit and allocates the physical resource block (PRB to the UE that requires the least ratio of the transmit power per bit. Through computer simulation, the performance of the proposed MP packet-scheduling algorithm is compared with the conventional packet-scheduling algorithms by two primary criteria: fairness and throughput. The simulation results show that the proposed algorithm outperforms the conventional algorithms in terms of the fairness and throughput.

  15. Contingency discriminability and the generalized matching law describe choice on concurrent ratio schedules of wheel-running reinforcement.

    Science.gov (United States)

    Belke, Terry W

    2012-07-01

    Belke (2010) showed that on concurrent ratio schedules, the difference in ratio requirements required to produce near exclusive preference for the lower ratio alternative was substantively greater when the reinforcer was wheel running than when it was sucrose. The current study replicated this finding and showed that this choice behavior can be described by the matching law and the contingency discriminability model. Eight female Long Evans rats were exposed to concurrent VR schedules of wheel-running reinforcement (30s) and the schedule value of the initially preferred alternative was systematically increased. Two rats rapidly developed exclusive preference for the lower ratio alternative, but the majority did not - even when ratios differed by 20:1. Analysis showed that estimates of slopes from the matching law and the proportion of reinforcers misattributed from the contingency discriminability model were related to the ratios at which near exclusive preference developed. The fit of these models would be consistent with misattribution of reinforcers or poor discrimination between alternatives due to the long duration of wheel running. Copyright © 2012 Elsevier B.V. All rights reserved.

  16. Evidence for positive, but not negative, behavioral contrast with wheel-running reinforcement on multiple variable-ratio schedules.

    Science.gov (United States)

    Belke, Terry W; Pierce, W David

    2016-12-01

    Rats responded on a multiple variable-ratio (VR) 10 VR 10 schedule of reinforcement in which lever pressing was reinforced by the opportunity to run in a wheel for 30s in both the changed (manipulated) and unchanged components. To generate positive contrast, the schedule of reinforcement in the changed component was shifted to extinction; to generate negative contrast, the schedule was shifted to VR 3. With the shift to extinction in the changed component, wheel-running and local lever-pressing rates increased in the unchanged component, a result supporting positive contrast; however, the shift to a VR 3 schedule in the changed component showed no evidence of negative contrast in the unaltered setting, only wheel running decreased in the unchanged component. Changes in wheel-running rates across components were consistent in showing a compensation effect, depending on whether the schedule manipulation increased or decreased opportunities for wheel running in the changed component. These findings are the first to demonstrate positive behavioral contrast on a multiple schedule with wheel running as reinforcement in both components. Copyright © 2016 Elsevier B.V. All rights reserved.

  17. Entity’s Irregular Demand Scheduling of the Wholesale Electricity Market based on the Forecast of Hourly Price Ratios

    Directory of Open Access Journals (Sweden)

    O. V. Russkov

    2015-01-01

    Full Text Available The article considers a hot issue to forecast electric power demand amounts and prices for the entities of wholesale electricity market (WEM, which are in capacity of a large user with production technology requirements prevailing over hourly energy planning ones. An electric power demand of such entities is on irregular schedule. The article analyses mathematical models, currently applied to forecast demand amounts and prices. It describes limits of time-series models and fundamental ones in case of hourly forecasting an irregular demand schedule of the electricity market entity. The features of electricity trading at WEM are carefully analysed. Factors that influence on irregularity of demand schedule of the metallurgical plant are shown. The article proposes method for the qualitative forecast of market price ratios as a tool to reduce a dependence on the accuracy of forecasting an irregular schedule of demand. It describes the differences between the offered method and the similar ones considered in research studies and scholarly works. The correlation between price ratios and relaxation in the requirements for the forecast accuracy of the electric power consumption is analysed. The efficiency function of forecast method is derived. The article puts an increased focus on description of the mathematical model based on the method of qualitative forecast. It shows main model parameters and restrictions the electricity market imposes on them. The model prototype is described as a programme module. Methods to assess an effectiveness of the proposed forecast model are examined. The positive test results of the model using JSC «Volzhsky Pipe Plant» data are given. A conclusion is drawn concerning the possibility to decrease dependence on the forecast accuracy of irregular schedule of entity’s demand at WEM. The effective trading tool has been found for the entities of irregular demand schedule at WEM. The tool application allows minimizing cost

  18. Effects of SKF-83566 and haloperidol on performance on progressive ratio schedules maintained by sucrose and corn oil reinforcement: quantitative analysis using a new model derived from the Mathematical Principles of Reinforcement (MPR).

    Science.gov (United States)

    Olarte-Sánchez, C M; Valencia-Torres, L; Cassaday, H J; Bradshaw, C M; Szabadi, E

    2013-12-01

    Mathematical models can assist the interpretation of the effects of interventions on schedule-controlled behaviour and help to differentiate between processes that may be confounded in traditional performance measures such as response rate and the breakpoint in progressive ratio (PR) schedules. The effects of a D1-like dopamine receptor antagonist, 8-bromo-2,3,4,5-tetrahydro-3-methyl-5-phenyl-1H-3-benzazepin-7-ol hydrobromide (SKF-83566), and a D2-like receptor antagonist, haloperidol, on rats' performance on PR schedules maintained by sucrose and corn oil reinforcers were assessed using a new model derived from Killeen's (Behav Brain Sci 17:105-172, 1994) Mathematical Principles of Reinforcement. Separate groups of rats were trained under a PR schedule using sucrose or corn oil reinforcers. SKF-83566 (0.015 and 0.03 mg kg(-1)) and haloperidol (0.05 and 0.1 mg kg(-1)) were administered intraperitoneally (five administrations of each treatment). Running and overall response rates in successive ratios were analysed using the new model, and estimates of the model's parameters were compared between treatments. Haloperidol reduced a (the parameter expressing incentive value) in the case of both reinforcers, but did not affect the parameters related to response time and post-reinforcement pausing. SKF-83566 reduced a and k (the parameter expressing sensitivity of post-reinforcement pausing to the prior inter-reinforcement interval) in the case of sucrose, but did not affect any of the parameters in the case of corn oil. The results are consistent with the hypothesis that blockade of both D1-like and D2-like receptors reduces the incentive value of sucrose, whereas the incentive value of corn oil is more sensitive to blockade of D2-like than D1-like receptors.

  19. Exclusive Preference Develops Less Readily on Concurrent Ratio Schedules with Wheel-Running than with Sucrose Reinforcement

    Science.gov (United States)

    Belke, Terry W.

    2010-01-01

    Previous research suggested that allocation of responses on concurrent schedules of wheel-running reinforcement was less sensitive to schedule differences than typically observed with more conventional reinforcers. To assess this possibility, 16 female Long Evans rats were exposed to concurrent FR FR schedules of reinforcement and the schedule…

  20. 1 Tbit/inch2 Recording in Angular-Multiplexing Holographic Memory with Constant Signal-to-Scatter Ratio Schedule

    Science.gov (United States)

    Hosaka, Makoto; Ishii, Toshiki; Tanaka, Asato; Koga, Shogo; Hoshizawa, Taku

    2013-09-01

    We developed an iterative method for optimizing the exposure schedule to obtain a constant signal-to-scatter ratio (SSR) to accommodate various recording conditions and achieve high-density recording. 192 binary images were recorded in the same location of a medium in approximately 300×300 µm2 using an experimental system embedded with a blue laser diode with a 405 nm wavelength and an objective lens with a 0.85 numerical aperture. The recording density of this multiplexing corresponds to 1 Tbit/in.2. The recording exposure time was optimized through the iteration of a three-step sequence consisting of total reproduced intensity measurement, target signal calculation, and recording energy density calculation. The SSR of pages recorded with this method was almost constant throughout the entire range of the reference beam angle. The signal-to-noise ratio of the sampled pages was over 2.9 dB, which is higher than the reproducible limit of 1.5 dB in our experimental system.

  1. Evidence for a role of 5-HT2C receptors in the motor aspects of performance, but not the efficacy of food reinforcers, in a progressive ratio schedule

    NARCIS (Netherlands)

    Bezzina, G.; Body, S.; Cheung, T.H.; Hampson, C.L.; Bradshaw, C.M.; Glennon, J.C.; Szabadi, E.

    2015-01-01

    RATIONALE: 5-Hydroxytryptamine2C (5-HT2C) receptor agonists reduce the breakpoint in progressive ratio schedules of reinforcement, an effect that has been attributed to a decrease of the efficacy of positive reinforcers. However, a reduction of the breakpoint may also reflect motor impairment.

  2. Evidence for a role of 5-HT2C receptors in the motor aspects of performance, but not the efficacy of food reinforcers, in a progressive ratio schedule.

    Science.gov (United States)

    Bezzina, G; Body, S; Cheung, T H C; Hampson, C L; Bradshaw, C M; Glennon, J C; Szabadi, E

    2015-02-01

    5-Hydroxytryptamine2C (5-HT2C) receptor agonists reduce the breakpoint in progressive ratio schedules of reinforcement, an effect that has been attributed to a decrease of the efficacy of positive reinforcers. However, a reduction of the breakpoint may also reflect motor impairment. Mathematical models can help to differentiate between these processes. The effects of the 5-HT2C receptor agonist Ro-600175 ((αS)-6-chloro-5-fluoro-α-methyl-1H-indole-1-ethanamine) and the non-selective 5-HT receptor agonist 1-(m-chlorophenyl)piperazine (mCPP) on rats' performance on a progressive ratio schedule maintained by food pellet reinforcers were assessed using a model derived from Killeen's Behav Brain Sci 17:105-172, 1994 general theory of schedule-controlled behaviour, 'mathematical principles of reinforcement'. Rats were trained under the progressive ratio schedule, and running and overall response rates in successive ratios were analysed using the model. The effects of the agonists on estimates of the model's parameters, and the sensitivity of these effects to selective antagonists, were examined. Ro-600175 and mCPP reduced the breakpoint. Neither agonist significantly affected a (the parameter expressing incentive value), but both agonists increased δ (the parameter expressing minimum response time). The effects of both agonists could be attenuated by the selective 5-HT2C receptor antagonist SB-242084 (6-chloro-5-methyl-N-{6-[(2-methylpyridin-3-yl)oxy]pyridin-3-yl}indoline-1-carboxamide). The effect of mCPP was not altered by isamoltane, a selective 5-HT1B receptor antagonist, or MDL-100907 ((±)2,3-dimethoxyphenyl-1-(2-(4-piperidine)methanol)), a selective 5-HT2A receptor antagonist. The results are consistent with the hypothesis that the effect of the 5-HT2C receptor agonists on progressive ratio schedule performance is mediated by an impairment of motor capacity rather than by a reduction of the incentive value of the food reinforcer.

  3. Effect of quinolinic acid-induced lesions of the nucleus accumbens core on performance on a progressive ratio schedule of reinforcement: implications for inter-temporal choice.

    Science.gov (United States)

    Bezzina, G; Body, S; Cheung, T H C; Hampson, C L; Deakin, J F W; Anderson, I M; Szabadi, E; Bradshaw, C M

    2008-04-01

    The nucleus accumbens core (AcbC) is believed to contribute to the control of operant behaviour by reinforcers. Recent evidence suggests that it is not crucial for determining the incentive value of immediately available reinforcers, but is important for maintaining the values of delayed reinforcers. This study aims to examine the effect of AcbC lesions on performance on a progressive-ratio schedule using a quantitative model that dissociates effects of interventions on motor and motivational processes (Killeen 1994 Mathematical principles of reinforcement. Behav Brain Sci 17:105-172). Rats with bilateral quinolinic acid-induced lesions of the AcbC (n = 15) or sham lesions (n = 14) were trained to lever-press for food-pellet reinforcers under a progressive-ratio schedule. In Phase 1 (90 sessions) the reinforcer was one pellet; in Phase 2 (30 sessions), it was two pellets; in Phase 3, (30 sessions) it was one pellet. The performance of both groups conformed to the model of progressive-ratio performance (group mean data: r2 > 0.92). The motor parameter, delta, was significantly higher in the AcbC-lesioned than the sham-lesioned group, reflecting lower overall response rates in the lesioned group. The motivational parameter, a, was sensitive to changes in reinforcer size, but did not differ significantly between the two groups. The AcbC-lesioned group showed longer post-reinforcement pauses and lower running response rates than the sham-lesioned group. The results suggest that destruction of the AcbC impairs response capacity but does not alter the efficacy of food reinforcers. The results are consistent with recent findings that AcbC lesions do not alter sensitivity to reinforcer size in inter-temporal choice schedules.

  4. Occupancy schedules for energy simulation in new prEN16798-1 and ISO/FDIS 17772-1 standards

    DEFF Research Database (Denmark)

    Ahmed, Kaiser; Akhondzada, Ali; Kurnitski, Jarek

    2017-01-01

    This study reports the development of occupancy, lighting and appliance hourly schedules for new energy calculation input data standards. Developed schedules apply for 10 building categories which are described by one to three space categories, and include the separation between weekdays and week......This study reports the development of occupancy, lighting and appliance hourly schedules for new energy calculation input data standards. Developed schedules apply for 10 building categories which are described by one to three space categories, and include the separation between weekdays......-1 standards, supported by appliances and lighting schedules which are similarly needed as energy calculation input data. Hourly schedules allow to model occupant behaviour effects, for instance the peak cooling load in an office room was increased by factor of 1.1–1.3 compared to the use of constant average...

  5. Estrutura de prática e validade ecológica no processo adaptativo de aprendizagem motora Practice schedule and ecological validity in the adaptive process of motor learning

    Directory of Open Access Journals (Sweden)

    Marcela Massigli

    2011-03-01

    Full Text Available O objetivo desse estudo foi investigar o efeito da estrutura de prática no processo adaptativo de aprendizagem motora em função da validade ecológica da situação experimental. Participaram do estudo 104 crianças distribuídas em oito grupos experimentais (dois níveis de validade ecológica x quatro estruturas de prática. A tarefa consistiu em rebater uma bola de tênis de mesa lançada por um equipamento ou pelo experimentador, com o objetivo de acertar um alvo localizado no lado oposto da mesa. O estudo envolveu duas fases: estabilização e adaptação. O desempenho foi analisado por meio da soma dos pontos obtidos em blocos de 10 tentativas. Os resultados mostraram que os efeitos das práticas constante, aleatória, constante-aleatória e aleatória-constante no processo adaptativo de aprendizagem motora foram similares em ambos os níveis de validade ecológica; a prática constante foi a estrutura menos efetiva no processo adaptativo de aprendizagem motora em ambas as situações experimentais.The aim of this study was to investigate the effect of different practice schedules in the adaptive process of motor learning in function of the ecological validity of the experimental situation. Participants were 104 children distributed in eight experimental groups (2 levels of ecological validity x 4 practice schedules. The task was to hit a table tennis ball thrown by equipment or experimenter, aiming to hit a target located on the opposite side of the table. The study was carried out in two phases: stabilization and adaptation. Performance was analyzed through the sum of the points achieved in ten trial blocks. Results showed that the effects of constant, random, constant-random and random-constant practice on the adaptive process of motor learning were similar in both levels of ecological validity; constant practice was the less effective schedule on the adaptive process of motor learning in both experimental situations.

  6. Estrutura de prática e idade no processo adaptativo da aprendizagem de uma tarefa de "timing" coincidente Practice schedule and age on the adaptive process of the coincident timing task learning

    Directory of Open Access Journals (Sweden)

    Lucia Afonso Gonçalves

    2010-12-01

    Full Text Available O objetivo desse estudo foi investigar os efeitos de diferentes estruturas de prática no processo adaptativo da aprendizagem de uma tarefa de "timing" coincidente em função da idade. Crianças (n = 40, adultos (n = 47 e idosos (n = 57 foram distribuídos em grupos de prática constante, aleatória, constante-aleatória e aleatória-constante. A tarefa consistiu consistia em tocar certos alvos de forma sequencial em integração a um estímulo visual. O delineamento envolveu duas fases de aprendizagem: estabilização e adaptação. Os dados foram analisados em relação aos erros absoluto, variável, constante e de execução. Os resultados mostraram que o processo adaptativo na aprendizagem de crianças, adultos e idosos de uma tarefa de "timing" coincidente foi mais beneficiado pela prática constante-aleatória.The objective of this study was to investigate the effects of different practice schedules on the adaptive process of a coincident timing task learning in function of age. Children (n = 40, adults (n = 47 and elderly (n = 57 were distributed into constant, random, constant-random and random-constant practice groups. The task consisted of touching response keys sequentially in conjunction with a visual stimulus. The experimental design was consisted of two learning phases: stabilization and adaptation. The data were analyzed in terms of absolute, variable, constant and execution errors. The results showed that the constant-random practice was the most efficient for the adaptive process in learning a coincident timing task regardless of the age group.

  7. Approximating Preemptive Stochastic Scheduling

    OpenAIRE

    Megow Nicole; Vredeveld Tjark

    2009-01-01

    We present constant approximative policies for preemptive stochastic scheduling. We derive policies with a guaranteed performance ratio of 2 for scheduling jobs with release dates on identical parallel machines subject to minimizing the sum of weighted completion times. Our policies as well as their analysis apply also to the recently introduced more general model of stochastic online scheduling. The performance guarantee we give matches the best result known for the corresponding determinist...

  8. The triangle scheduling problem

    NARCIS (Netherlands)

    Dürr, Christoph; Hanzálek, Zdeněk; Konrad, Christian; Seddik, Yasmina; Sitters, R.A.; Vásquez, Óscar C.; Woeginger, Gerhard

    2017-01-01

    This paper introduces a novel scheduling problem, where jobs occupy a triangular shape on the time line. This problem is motivated by scheduling jobs with different criticality levels. A measure is introduced, namely the binary tree ratio. It is shown that the Greedy algorithm solves the problem to

  9. Refinery scheduling

    Energy Technology Data Exchange (ETDEWEB)

    Magalhaes, Marcus V.; Fraga, Eder T. [PETROBRAS, Rio de Janeiro, RJ (Brazil); Shah, Nilay [Imperial College, London (United Kingdom)

    2004-07-01

    This work addresses the refinery scheduling problem using mathematical programming techniques. The solution adopted was to decompose the entire refinery model into a crude oil scheduling and a product scheduling problem. The envelope for the crude oil scheduling problem is composed of a terminal, a pipeline and the crude area of a refinery, including the crude distillation units. The solution method adopted includes a decomposition technique based on the topology of the system. The envelope for the product scheduling comprises all tanks, process units and products found in a refinery. Once crude scheduling decisions are Also available the product scheduling is solved using a rolling horizon algorithm. All models were tested with real data from PETROBRAS' REFAP refinery, located in Canoas, Southern Brazil. (author)

  10. Schedule Analytics

    Science.gov (United States)

    2016-04-30

    Warfare, Naval Sea Systems Command Acquisition Cycle Time : Defining the Problem David Tate, Institute for Defense Analyses Schedule Analytics Jennifer...research was comprised of the following high- level steps :  Identify and review primary data sources 1...research. However, detailed reviews of the OMB IT Dashboard data revealed that schedule data is highly aggregated. Program start date and program end date

  11. Selective dopamine D3 receptor antagonism by SB-277011A attenuates cocaine reinforcement as assessed by progressive-ratio and variable-cost–variable-payoff fixed-ratio cocaine self-administration in rats

    OpenAIRE

    Xi, Zheng-Xiong; Gilbert, Jeremy G.; Pak, Arlene C.; Ashby, Charles R.; Heidbreder, Christian A.; Gardner, Eliot L.

    2005-01-01

    In rats, acute administration of SB-277011A, a highly selective dopamine (DA) D3 receptor antagonist, blocks cocaine-enhanced brain stimulation reward, cocaine-seeking behaviour and reinstatement of cocaine-seeking behaviour. Here, we investigated whether SB-277011A attenuates cocaine reinforcement as assessed by cocaine self-administration under variable-cost–variable-payoff fixed-ratio (FR) and progressive-ratio (PR) reinforcement schedules. Acute i.p. administration of SB-277011A (3–24 mg/...

  12. How should periods without social interaction be scheduled? Children's preference for practical schedules of positive reinforcement.

    Science.gov (United States)

    Luczynski, Kevin C; Hanley, Gregory P

    2014-01-01

    Several studies have shown that children prefer contingent reinforcement (CR) rather than yoked noncontingent reinforcement (NCR) when continuous reinforcement is programmed in the CR schedule. Preference has not, however, been evaluated for practical schedules that involve CR. In Study 1, we assessed 5 children's preference for obtaining social interaction via a multiple schedule (periods of fixed-ratio 1 reinforcement alternating with periods of extinction), a briefly signaled delayed reinforcement schedule, and an NCR schedule. The multiple schedule promoted the most efficient level of responding. In general, children chose to experience the multiple schedule and avoided the delay and NCR schedules, indicating that they preferred multiple schedules as the means to arrange practical schedules of social interaction. In Study 2, we evaluated potential controlling variables that influenced 1 child's preference for the multiple schedule and found that the strong positive contingency was the primary variable. © Society for the Experimental Analysis of Behavior.

  13. Scheduling the scheduling task : a time management perspective on scheduling

    NARCIS (Netherlands)

    Larco Martinelli, J.A.; Wiers, V.C.S.; Fransoo, J.C.

    2013-01-01

    Time is the most critical resource at the disposal of schedulers. Hence, an adequate management of time from the schedulers may impact positively on the scheduler’s productivity and responsiveness to uncertain scheduling environments. This paper presents a field study of how schedulers make use of

  14. KASS v.2.2. scheduling software for construction

    OpenAIRE

    Krzemiński Michał

    2016-01-01

    The paper presents fourth version of specialist useful software in scheduling KASS v.2.2 (Algorithm Scheduling Krzeminski System). KASS software is designed for construction scheduling, specially form flow shop models. The program is being dedicated closely for the purposes of the construction. In distinguishing to other used programs in tasks of this type operational research criteria were designed closely with the thought about construction works and about the specificity of the building pr...

  15. Instructions, multiple schedules, and extinction: Distinguishing rule-governed from schedule-controlled behavior.

    Science.gov (United States)

    Hayes, S C; Brownstein, A J; Haas, J R; Greenway, D E

    1986-09-01

    Schedule sensitivity has usually been examined either through a multiple schedule or through changes in schedules after steady-state responding has been established. This study compared the effects of these two procedures when various instructions were given. Fifty-five college students responded in two 32-min sessions under a multiple fixed-ratio 18/differential-reinforcement-of-low-rate 6-s schedule, followed by one session of extinction. Some subjects received no instructions regarding the appropriate rates of responding, whereas others received instructions to respond slowly, rapidly, or both. Relative to the schedule in operation, the instructions were minimal, partially inaccurate, or accurate. When there was little schedule sensitivity in the multiple schedule, there was little in extinction. When apparently schedule-sensitive responding occurred in the multiple schedule, however, sensitivity in extinction occurred only if differential responding in the multiple schedule could not be due to rules supplied by the experimenter. This evidence shows that rule-governed behavior that occurs in the form of schedule-sensitive behavior may not in fact become schedule-sensitive even though it makes contact with the scheduled reinforcers.

  16. Determination of the differences in oxidation potentials for the Pr3+/Pr2+ and Ce3+/Ce2+ pairs in halide melts

    International Nuclear Information System (INIS)

    Mikheev, N.B.; Auerman, L.N.; Rumer, I.A.; D'yachkova, R.A.

    1983-01-01

    Cocrystallization has been used with the (PrOCl)/sub s. ph/ - (PrCl 2 , PrCl 3 , SrCl 2 ) melt system to examine the dependence of the cerium(III) cocrystallization coefficient on the X/sub Pr 2+ /X/sub Pr 3+ / ratio in the melt. Measurement has been made in this way of the difference in oxidation potentials for the pairs Pr 3+ /Pr 2+ and Ce 3+ /Ce 2+ : ΔE/sub Pr 3+ /Pr 2+0 -E/sub Ce 3+ /Ce 2+ / 0 , which is 0.08 +/- 0.04 V for chloride

  17. Immunization Schedules for Adults

    Science.gov (United States)

    ... ACIP Vaccination Recommendations Why Immunize? Vaccines: The Basics Immunization Schedule for Adults (19 Years of Age and ... diseases that can be prevented by vaccines . 2018 Immunization Schedule Recommended Vaccinations for Adults by Age and ...

  18. Instant Childhood Immunization Schedule

    Science.gov (United States)

    ... Recommendations Why Immunize? Vaccines: The Basics Instant Childhood Immunization Schedule Recommend on Facebook Tweet Share Compartir Get ... date. See Disclaimer for additional details. Based on Immunization Schedule for Children 0 through 6 Years of ...

  19. Medicare Program; Revisions to Payment Policies Under the Physician Fee Schedule and Other Revisions to Part B for CY 2017; Medicare Advantage Bid Pricing Data Release; Medicare Advantage and Part D Medical Loss Ratio Data Release; Medicare Advantage Provider Network Requirements; Expansion of Medicare Diabetes Prevention Program Model; Medicare Shared Savings Program Requirements. Final rule.

    Science.gov (United States)

    2016-11-15

    This major final rule addresses changes to the physician fee schedule and other Medicare Part B payment policies, such as changes to the Value Modifier, to ensure that our payment systems are updated to reflect changes in medical practice and the relative value of services, as well as changes in the statute. This final rule also includes changes related to the Medicare Shared Savings Program, requirements for Medicare Advantage Provider Networks, and provides for the release of certain pricing data from Medicare Advantage bids and of data from medical loss ratio reports submitted by Medicare health and drug plans. In addition, this final rule expands the Medicare Diabetes Prevention Program model.

  20. Web Publishing Schedule

    Science.gov (United States)

    Section 207(f)(2) of the E-Gov Act requires federal agencies to develop an inventory and establish a schedule of information to be published on their Web sites, make those schedules available for public comment. To post the schedules on the web site.

  1. Preemptive scheduling with rejection

    NARCIS (Netherlands)

    Hoogeveen, H.; Skutella, M.; Woeginger, Gerhard

    2003-01-01

    We consider the problem of preemptively scheduling a set of n jobs on m (identical, uniformly related, or unrelated) parallel machines. The scheduler may reject a subset of the jobs and thereby incur job-dependent penalties for each rejected job, and he must construct a schedule for the remaining

  2. Preemptive scheduling with rejection

    NARCIS (Netherlands)

    Hoogeveen, J.A.; Skutella, M.; Woeginger, G.J.; Paterson, M.

    2000-01-01

    We consider the problem of preemptively scheduling a set of n jobs on m (identical, uniformly related, or unrelated) parallel machines. The scheduler may reject a subset of the jobs and thereby incur job-dependent penalties for each rejected job, and he must construct a schedule for the remaining

  3. Outage scheduling and implementation

    International Nuclear Information System (INIS)

    Allison, J.E.; Segall, P.; Smith, R.R.

    1986-01-01

    Successful preparation and implementation of an outage schedule and completion of scheduled and emergent work within an identified critical path time frame is a result of careful coordination by Operations, Work Control, Maintenance, Engineering, Planning and Administration and others. At the Fast Flux Test Facility (FFTF) careful planning has been responsible for meeting all scheduled outage critical paths

  4. Scheduling with Time Lags

    NARCIS (Netherlands)

    X. Zhang (Xiandong)

    2010-01-01

    textabstractScheduling is essential when activities need to be allocated to scarce resources over time. Motivated by the problem of scheduling barges along container terminals in the Port of Rotterdam, this thesis designs and analyzes algorithms for various on-line and off-line scheduling problems

  5. NASA scheduling technologies

    Science.gov (United States)

    Adair, Jerry R.

    1994-01-01

    This paper is a consolidated report on ten major planning and scheduling systems that have been developed by the National Aeronautics and Space Administration (NASA). A description of each system, its components, and how it could be potentially used in private industry is provided in this paper. The planning and scheduling technology represented by the systems ranges from activity based scheduling employing artificial intelligence (AI) techniques to constraint based, iterative repair scheduling. The space related application domains in which the systems have been deployed vary from Space Shuttle monitoring during launch countdown to long term Hubble Space Telescope (HST) scheduling. This paper also describes any correlation that may exist between the work done on different planning and scheduling systems. Finally, this paper documents the lessons learned from the work and research performed in planning and scheduling technology and describes the areas where future work will be conducted.

  6. Brief-stimulus presentations on multiform tandem schedules

    OpenAIRE

    Reed, Phil

    1994-01-01

    Three experiments examined the influence of a brief stimulus (a light) on the behavior of food-deprived rats whose lever pressing on tandem schedules comprising components of different schedule types resulted in food presentation. In Experiment 1, either a tandem variable-ratio variable-interval or a tandem variable-interval variable-ratio schedule was used. The variable-interval requirement in the tandem variable-ratio variable-interval schedule was yoked to the time taken to complete the va...

  7. Scheduling for decommissioning projects

    International Nuclear Information System (INIS)

    Podmajersky, O.E.

    1987-01-01

    This paper describes the Project Scheduling system being employed by the Decommissioning Operations Contractor at the Shippingport Station Decommissioning Project (SSDP). Results from the planning system show that the project continues to achieve its cost and schedule goals. An integrated cost and schedule control system (C/SCS) which uses the concept of earned value for measurement of performance was instituted in accordance with DOE orders. The schedule and cost variances generated by the C/SCS system are used to confirm management's assessment of project status. This paper describes the types of schedules and tools used on the SSDP project to plan and monitor the work, and identifies factors that are unique to a decommissioning project that make scheduling critical to the achievement of the project's goals. 1 fig

  8. Program reference schedule baseline

    International Nuclear Information System (INIS)

    1986-07-01

    This Program Reference Schedule Baseline (PRSB) provides the baseline Program-level milestones and associated schedules for the Civilian Radioactive Waste Management Program. It integrates all Program-level schedule-related activities. This schedule baseline will be used by the Director, Office of Civilian Radioactive Waste Management (OCRWM), and his staff to monitor compliance with Program objectives. Chapter 1 includes brief discussions concerning the relationship of the PRSB to the Program Reference Cost Baseline (PRCB), the Mission Plan, the Project Decision Schedule, the Total System Life Cycle Cost report, the Program Management Information System report, the Program Milestone Review, annual budget preparation, and system element plans. Chapter 2 includes the identification of all Level 0, or Program-level, milestones, while Chapter 3 presents and discusses the critical path schedules that correspond to those Level 0 milestones

  9. Responsive versus scheduled feeding in preterm infants (Review)

    OpenAIRE

    Watson, Julie; McGuire, William

    2015-01-01

    Scheduled feeding of prescribed enteral volumes remains standard practice for preterm infants. However, feeding preterm infants in response to their feeding and satiation cues (responsive, cue-based, or infant led feeding) rather than at scheduled intervals might enhance parent experience and satisfaction, help in the establishment of independent oral feeding, increase nutrient intake and growth rates, and allow earlier hospital discharge.\\ud \\ud Objectives: To assess the effect of feeding pr...

  10. Revisiting Symbiotic Job Scheduling

    OpenAIRE

    Eyerman , Stijn; Michaud , Pierre; Rogiest , Wouter

    2015-01-01

    International audience; —Symbiotic job scheduling exploits the fact that in a system with shared resources, the performance of jobs is impacted by the behavior of other co-running jobs. By coscheduling combinations of jobs that have low interference, the performance of a system can be increased. In this paper, we investigate the impact of using symbiotic job scheduling for increasing throughput. We find that even for a theoretically optimal scheduler, this impact is very low, despite the subs...

  11. Esquema reduzido de vacinação anti-rábica humana pré-exposição e avaliação de doses anuais de reforço A reduced schedule for anti-rabic pre-exposure vaccination in humans and annual assessment booster doses

    Directory of Open Access Journals (Sweden)

    Esther Luiza Bocato Chamelet

    1982-06-01

    Full Text Available São apresentados os resultados do emprego de esquema de vacinação anti-rábida humana pré-exposição, constituído de 3 doses de vacina tipo Fuenzalida-Palacios administradas a 165 pacientes em dias alternados, mais uma dose de reforço no 30.° dia após a dose inicial. Os títulos de anticorpos foram determinados por prova de soroneutralização em amostras de sangue colhidas antes, 30 e 40 dias após administração da primeira dose. Verificou-se que no 30.° dia, 74,6% dos pacientes apresentaram anticorpos neutralizantes no soro, valor que se elevou a 98,1% no quadragésimo dia, o que mostra a eficácia do esquema em relação à resposta imunitária em tempo relativamente curto e a importância da dose de reforço como estímulo à produção de anticorpos. Nos pacientes submetidos às doses anuais de reforço num período de 10 anos, verificou-se aumento gradual da presença de anticorpos antes da administração da dose de reforço subseqüente, até atingir valores de 100%. Face aos resultados obtidos foi sugerido que as doses de reforço sejam administradas a intervalos de tempo maiores e precedidas da titulagem de anticorpos a fim de se avaliar da necessidade ou não de sua administração.A reduced schedule for a pre-exposure anti-rabic immunization, of humans with 3 doses of 1 ml of Fuenzalida-Palacios type vaccine administered on alternate days, plus one booster 30 days after the first dose, was related. The blood samples were collected on the 0, 30th and 40th day after the first vaccine dose and the antibody titration was performed by serum neutralizing test. It was observed that 74,6% of the patients presented serum neutralizing antibodies on the 30th day and 98.1% on the 40th day, demonstrating the efficacy of this reduced schedule in stimulating the antibody response in a short time. The importance of a booster dose was emphasized. In the patients submitted to annual boosters over a period of 10 years, a gradual increase in

  12. Alternative Work Schedules: Definitions

    Science.gov (United States)

    Journal of the College and University Personnel Association, 1977

    1977-01-01

    The term "alternative work schedules" encompasses any variation of the requirement that all permanent employees in an organization or one shift of employees adhere to the same five-day, seven-to-eight-hour schedule. This article defines staggered hours, flexible working hours (flexitour and gliding time), compressed work week, the task system, and…

  13. Range Scheduling Aid (RSA)

    Science.gov (United States)

    Logan, J. R.; Pulvermacher, M. K.

    1991-01-01

    Range Scheduling Aid (RSA) is presented in the form of the viewgraphs. The following subject areas are covered: satellite control network; current and new approaches to range scheduling; MITRE tasking; RSA features; RSA display; constraint based analytic capability; RSA architecture; and RSA benefits.

  14. Golden Ratio

    Indian Academy of Sciences (India)

    Our attraction to another body increases if the body is symmetricaland in proportion. If a face or a structure is in proportion,we are more likely to notice it and find it beautiful.The universal ratio of beauty is the 'Golden Ratio', found inmany structures. This ratio comes from Fibonacci numbers.In this article, we explore this ...

  15. Golden Ratio

    Indian Academy of Sciences (India)

    Keywords. Fibonacci numbers, golden ratio, Sanskrit prosody, solar panel. Abstract. Our attraction to another body increases if the body is symmetricaland in proportion. If a face or a structure is in proportion,we are more likely to notice it and find it beautiful.The universal ratio of beauty is the 'Golden Ratio', found inmany ...

  16. Golden Ratio

    Indian Academy of Sciences (India)

    Our attraction to another body increases if the body is sym- metrical and in proportion. If a face or a structure is in pro- portion, we are more likely to notice it and find it beautiful. The universal ratio of beauty is the 'Golden Ratio', found in many structures. This ratio comes from Fibonacci numbers. In this article, we explore this ...

  17. Digestibilidade aparente de dietas práticas com diferentes relações energia: proteína em juvenis de pirarucu Apparent digestibility coefficient of practical diets with different energy: protein ratios for pirarucu juveniles

    Directory of Open Access Journals (Sweden)

    Eduardo Akifumi Ono

    2008-02-01

    Full Text Available O objetivo deste trabalho foi determinar a digestibilidade aparente de nutrientes e energia de dietas para juvenis de pirarucu, Arapaima gigas. Foram testadas oito dietas, contendo quatro relações energia:proteína (11, 10,1, 9, 8 kcal energia digestível por grama de proteína bruta e duas fontes de energia não-protéica (óleo de soja e gordura de aves, em esquema fatorial 4x2, com três repetições. Foram estocados 240 juvenis de pirarucu com peso de 96,8±2,3 g, distribuídos em 24 tanques cilíndricos com fundo cônico, adaptados para a coleta de fezes (sistema Guelph modificado. Os peixes foram alimentados duas vezes ao dia até a saciedade aparente com as dietas experimentais contendo 0,5% de óxido de cromo, como marcador inerte para determinação dos coeficientes de digestibilidade aparente. As dietas com a relação energia:proteína de 9 kcal energia digestível por grama de proteína bruta apresentaram os menores coeficientes de digestibilidade aparente da matéria seca, proteína bruta e extrativo não nitrogenado. O maior coeficiente de digestibilidade aparente da gordura foi obtido com o uso do óleo de soja. A relação energia:proteína na dieta influencia os coeficientes de digestibilidade aparente dos macronutrientes e energia no pirarucu.The objective of this work was to determine the apparent digestibility of nutrients and energy of diets for pirarucu (Arapaima gigas juveniles. Eight experimental diets containing four energy:protein ratios (11, 10.1, 9, 8 kcal digestible energy per gram of crude protein and two non-protein energy sources (soybean oil and poultry fat were tested in a 4x2 factorial scheme, in triplicates. Two hundred and forty pirarucu juveniles weighting 96.8±2.3 g were distributed in 24 cylindrical-conical fiberglass tanks, adapted for feces collection (modified Guelph system. Fish were fed twice a day to apparent satiation, with experimental diets containing 0.5% of chromium oxide as inert marker in

  18. Influences on Cocaine Tolerance Assessed under a Multiple Conjunctive Schedule of Reinforcement

    Science.gov (United States)

    Yoon, Jin Ho; Branch, Marc N.

    2009-01-01

    Under multiple schedules of reinforcement, previous research has generally observed tolerance to the rate-decreasing effects of cocaine that has been dependent on schedule-parameter size in the context of fixed-ratio (FR) schedules, but not under the context of fixed-interval (FI) schedules of reinforcement. The current experiment examined the…

  19. Generating variable and random schedules of reinforcement using Microsoft Excel macros.

    Science.gov (United States)

    Bancroft, Stacie L; Bourret, Jason C

    2008-01-01

    Variable reinforcement schedules are used to arrange the availability of reinforcement following varying response ratios or intervals of time. Random reinforcement schedules are subtypes of variable reinforcement schedules that can be used to arrange the availability of reinforcement at a constant probability across number of responses or time. Generating schedule values for variable and random reinforcement schedules can be difficult. The present article describes the steps necessary to write macros in Microsoft Excel that will generate variable-ratio, variable-interval, variable-time, random-ratio, random-interval, and random-time reinforcement schedule values.

  20. NASA Schedule Management Handbook

    Science.gov (United States)

    2011-01-01

    The purpose of schedule management is to provide the framework for time-phasing, resource planning, coordination, and communicating the necessary tasks within a work effort. The intent is to improve schedule management by providing recommended concepts, processes, and techniques used within the Agency and private industry. The intended function of this handbook is two-fold: first, to provide guidance for meeting the scheduling requirements contained in NPR 7120.5, NASA Space Flight Program and Project Management Requirements, NPR 7120.7, NASA Information Technology and Institutional Infrastructure Program and Project Requirements, NPR 7120.8, NASA Research and Technology Program and Project Management Requirements, and NPD 1000.5, Policy for NASA Acquisition. The second function is to describe the schedule management approach and the recommended best practices for carrying out this project control function. With regards to the above project management requirements documents, it should be noted that those space flight projects previously established and approved under the guidance of prior versions of NPR 7120.5 will continue to comply with those requirements until project completion has been achieved. This handbook will be updated as needed, to enhance efficient and effective schedule management across the Agency. It is acknowledged that most, if not all, external organizations participating in NASA programs/projects will have their own internal schedule management documents. Issues that arise from conflicting schedule guidance will be resolved on a case by case basis as contracts and partnering relationships are established. It is also acknowledged and understood that all projects are not the same and may require different levels of schedule visibility, scrutiny and control. Project type, value, and complexity are factors that typically dictate which schedule management practices should be employed.

  1. Sex ratios

    OpenAIRE

    West, Stuart A; Reece, S E; Sheldon, Ben C

    2002-01-01

    Sex ratio theory attempts to explain variation at all levels (species, population, individual, brood) in the proportion of offspring that are male (the sex ratio). In many cases this work has been extremely successful, providing qualitative and even quantitative explanations of sex ratio variation. However, this is not always the situation, and one of the greatest remaining problems is explaining broad taxonomic patterns. Specifically, why do different organisms show so ...

  2. Physician Fee Schedule Search

    Data.gov (United States)

    U.S. Department of Health & Human Services — This website is designed to provide information on services covered by the Medicare Physician Fee Schedule (MPFS). It provides more than 10,000 physician services,...

  3. Clinical Laboratory Fee Schedule

    Data.gov (United States)

    U.S. Department of Health & Human Services — Outpatient clinical laboratory services are paid based on a fee schedule in accordance with Section 1833(h) of the Social Security Act. The clinical laboratory fee...

  4. CERN confirms LHC schedule

    CERN Document Server

    2003-01-01

    The CERN Council held its 125th session on 20 June. Highlights of the meeting included confirmation that the LHC is on schedule for a 2007 start-up, and the announcement of a new organizational structure in 2004.

  5. DMEPOS Fee Schedule

    Data.gov (United States)

    U.S. Department of Health & Human Services — The list contains the fee schedule amounts, floors, and ceilings for all procedure codes and payment category, jurisdication, and short description assigned to each...

  6. Project Schedule Simulation

    DEFF Research Database (Denmark)

    Mizouni, Rabeb; Lazarova-Molnar, Sanja

    2015-01-01

    overrun both their budget and time. To improve the quality of initial project plans, we show in this paper the importance of (1) reflecting features’ priorities/risk in task schedules and (2) considering uncertainties related to human factors in plan schedules. To make simulation tasks reflect features......’ priority as well as multimodal team allocation, enhanced project schedules (EPS), where remedial actions scenarios (RAS) are added, were introduced. They reflect potential schedule modifications in case of uncertainties and promote a dynamic sequencing of involved tasks rather than the static conventional...... this document as an instruction set. The electronic file of your paper will be formatted further at Journal of Software. Define all symbols used in the abstract. Do not cite references in the abstract. Do not delete the blank line immediately above the abstract; it sets the footnote at the bottom of this column....

  7. Decentralized Ground Staff Scheduling

    DEFF Research Database (Denmark)

    Sørensen, M. D.; Clausen, Jens

    2002-01-01

    scheduling is investigated. The airport terminal is divided into zones, where each zone consists of a set of stands geographically next to each other. Staff is assigned to work in only one zone and the staff scheduling is planned decentralized for each zone. The advantage of this approach is that the staff...... work in a smaller area of the terminal and thus spends less time walking between stands. When planning decentralized the allocation of stands to flights influences the staff scheduling since the workload in a zone depends on which flights are allocated to stands in the zone. Hence solving the problem...... depends on the actual stand allocation but also on the number of zones and the layout of these. A mathematical model of the problem is proposed, which integrates the stand allocation and the staff scheduling. A heuristic solution method is developed and applied on a real case from British Airways, London...

  8. Reactor outage schedule (tentative)

    Energy Technology Data Exchange (ETDEWEB)

    Walton, R.P.

    1969-11-01

    This single page document is the November 1, 1969 reactor refueling outage schedule for the Hanford Production Reactor. It also contains data on the amounts and types of fuels to be loaded and relocated in the production reactor.

  9. Reactor outage schedule (tentative)

    Energy Technology Data Exchange (ETDEWEB)

    Walton, R.P.

    1969-10-01

    This single page document is the October 1, 1969 reactor refueling outage schedule for the Hanford Production Reactor. It also contains data on the amounts and types of fuels to be loaded and relocated in the Production Reactor.

  10. Reactor outage schedule (tentative)

    Energy Technology Data Exchange (ETDEWEB)

    Walton, R.P.

    1969-10-15

    This single page document is the October 15, 1969 reactor refueling outage schedule for the Hanford Production Reactor. It also contains data on the amounts and types of fuels to be loaded and relocated in the Production Reactor.

  11. Reactor outage schedule (tentative)

    Energy Technology Data Exchange (ETDEWEB)

    Walton, R.P.

    1969-09-15

    This single page document is the September 15, 1969 reactor refueling outage schedule for the Hanford Production Reactor. It also contains data on the amounts and types of fuels to be loaded and relocated in the Production Reactor.

  12. Reactor outage schedule (tentative)

    Energy Technology Data Exchange (ETDEWEB)

    Walton, R.P.

    1969-12-15

    This single page document is the December 16, 1969 reactor refueling outage schedule for the Hanford Production Reactor. It also contains data on the amounts and types of fuels to be loaded and relocated in the Production reactor.

  13. Reactor outage schedule (tentative)

    Energy Technology Data Exchange (ETDEWEB)

    Walton, R.P.

    1969-12-01

    This single page document is the December 1, 1969 reactor refueling outage schedule for the Hanford Production Reactor. It also contains data on the amounts and types of fuels to be loaded and relocated in the Production reactor.

  14. Fee Schedules - General Information

    Data.gov (United States)

    U.S. Department of Health & Human Services — A fee schedule is a complete listing of fees used by Medicare to pay doctors or other providers-suppliers. This comprehensive listing of fee maximums is used to...

  15. CMS Records Schedule

    Data.gov (United States)

    U.S. Department of Health & Human Services — The CMS Records Schedule provides disposition authorizations approved by the National Archives and Records Administration (NARA) for CMS program-related records...

  16. Potential support ratios

    DEFF Research Database (Denmark)

    Kjærgaard, Søren; Canudas-Romo, Vladimir

    2017-01-01

    The ‘prospective potential support ratio’ has been proposed by researchers as a measure that accurately quantifies the burden of ageing, by identifying the fraction of a population that has passed a certain measure of longevity, for example, 17 years of life expectancy. Nevertheless......, the prospective potential support ratio usually focuses on the current mortality schedule, or period life expectancy. Instead, in this paper we look at the actual mortality experienced by cohorts in a population, using cohort life tables. We analyse differences between the two perspectives using mortality models...

  17. Development of an irrigation scheduling software based on model predicted crop water stress

    Science.gov (United States)

    Modern irrigation scheduling methods are generally based on sensor-monitored soil moisture regimes rather than crop water stress which is difficult to measure in real-time, but can be computed using agricultural system models. In this study, an irrigation scheduling software based on RZWQM2 model pr...

  18. ATLAS construction schedule

    CERN Multimedia

    Kotamaki, M

    The goal during the last few months has been to freeze and baseline as much as possible the schedules of various ATLAS systems and activities. The main motivations for the re-baselining of the schedules have been the new LHC schedule aiming at first collisions in early 2006 and the encountered delays in civil engineering as well as in the production of some of the detectors. The process was started by first preparing a new installation schedule that takes into account all the new external constraints and the new ATLAS staging scenario. The installation schedule version 3 was approved in the March EB and it provides the Ready For Installation (RFI) milestones for each system, i.e. the date when the system should be available for the start of the installation. TCn is now interacting with the systems aiming at a more realistic and resource loaded version 4 before the end of the year. Using the new RFI milestones as driving dates a new summary schedule has been prepared, or is under preparation, for each system....

  19. Constraint-based job shop scheduling with ILOG SCHEDULER

    NARCIS (Netherlands)

    Nuijten, W.P.M.; Le Pape, C.

    1998-01-01

    We introduce constraint-based scheduling and discuss its main principles. An approximation algorithm based on tree search is developed for the job shop scheduling problem using ILOG SCHEDULER. A new way of calculating lower bounds on the makespan of the job shop scheduling problem is presented and

  20. Planning and scheduling - A schedule's performance

    International Nuclear Information System (INIS)

    Whitman, N.M.

    1993-01-01

    Planning and scheduling is a process whose time has come to PSI Energy. With an awareness of the challenges ahead, individuals must look for ways to enhance the corporate competitiveness. Working toward this goal means that each individual has to dedicate themselves to this more competitive corporate environment. Being competitive may be defined as the ability of each employee to add value to the corporation's economic well being. The timely and successful implementation of projects greatly enhances competitiveness. Those projects that do not do well often suffer from lack of proper execution - not for lack of talent or strategic vision. Projects are consumers of resources such as cash and people. They produce a return when completed and will generate a better return when properly completed utilizing proven project management techniques. Completing projects on time, within budget and meeting customer expectations is the way a corporation builds it's future. This paper offers suggestions on implementing planning and scheduling and provides a review of results in the form of management reports

  1. Constraint-based scheduling

    Science.gov (United States)

    Zweben, Monte

    1993-01-01

    The GERRY scheduling system developed by NASA Ames with assistance from the Lockheed Space Operations Company, and the Lockheed Artificial Intelligence Center, uses a method called constraint-based iterative repair. Using this technique, one encodes both hard rules and preference criteria into data structures called constraints. GERRY repeatedly attempts to improve schedules by seeking repairs for violated constraints. The system provides a general scheduling framework which is being tested on two NASA applications. The larger of the two is the Space Shuttle Ground Processing problem which entails the scheduling of all the inspection, repair, and maintenance tasks required to prepare the orbiter for flight. The other application involves power allocation for the NASA Ames wind tunnels. Here the system will be used to schedule wind tunnel tests with the goal of minimizing power costs. In this paper, we describe the GERRY system and its application to the Space Shuttle problem. We also speculate as to how the system would be used for manufacturing, transportation, and military problems.

  2. SPANR planning and scheduling

    Science.gov (United States)

    Freund, Richard F.; Braun, Tracy D.; Kussow, Matthew; Godfrey, Michael; Koyama, Terry

    2001-07-01

    SPANR (Schedule, Plan, Assess Networked Resources) is (i) a pre-run, off-line planning and (ii) a runtime, just-in-time scheduling mechanism. It is designed to support primarily commercial applications in that it optimizes throughput rather than individual jobs (unless they have highest priority). Thus it is a tool for a commercial production manager to maximize total work. First the SPANR Planner is presented showing the ability to do predictive 'what-if' planning. It can answer such questions as, (i) what is the overall effect of acquiring new hardware or (ii) what would be the effect of a different scheduler. The ability of the SPANR Planner to formulate in advance tree-trimming strategies is useful in several commercial applications, such as electronic design or pharmaceutical simulations. The SPANR Planner is demonstrated using a variety of benchmarks. The SPANR Runtime Scheduler (RS) is briefly presented. The SPANR RS can provide benefit for several commercial applications, such as airframe design and financial applications. Finally a design is shown whereby SPANR can provide scheduling advice to most resource management systems.

  3. Estimating exponential scheduling preferences

    DEFF Research Database (Denmark)

    Hjorth, Katrine; Börjesson, Maria; Engelson, Leonid

    2015-01-01

    of car drivers' route and mode choice under uncertain travel times. Our analysis exposes some important methodological issues related to complex non-linear scheduling models: One issue is identifying the point in time where the marginal utility of being at the destination becomes larger than the marginal......Different assumptions about travelers' scheduling preferences yield different measures of the cost of travel time variability. Only few forms of scheduling preferences provide non-trivial measures which are additive over links in transport networks where link travel times are arbitrarily...... utility of being at the origin. Another issue is that models with the exponential marginal utility formulation suffer from empirical identification problems. Though our results are not decisive, they partly support the constant-affine specification, in which the value of travel time variability...

  4. Preconditioning with oil mixes of high ratio Omega-9: Omega-6 and a low ratio Omega-6:Omega-3 in rats subjected to brain ischemia/reperfusion Pré-condicionamento com misturas de óleos com Ômega-9: Ômega-6 (alta relação e Ômega-6:Ômega-3 (baixa relação em ratos submetidos à isquemia/reperfusão cerebral

    Directory of Open Access Journals (Sweden)

    Petrúcia Maria Antero Pinheiro

    2011-01-01

    Full Text Available PURPOSE: This study aimed to assess the effects of preconditioning with mixtures of oils containing high/low ratio of ω-6/ω-3 and ω-9/ω-6, respectively, in an experimental model of cerebral ischemia-reperfusion (I/R. METHODS: Forty-two Wistar rats were randomly distributed into two groups: control (n=24 and test (n=18. Control group was subdivided in 4 subgroups (n=6: G1: Sham-Water; G2: I/R-Water; G3: Sham-Isolipidic and G4: I/R-Isolipid. The animals received water or a isolipid mixture containing ω-3 oils (8:1 ratio and ω-9/ω-6 (0.4:1 ratio by gavage for seven days. Test group included 3 subgroups (n=6 G5: I/R-Mix1, G: 6 I/R-Mix2 and G7: I/R-Mix3. Test group animals received oily mixtures of ω-3 (1.4:1 ratio and ω-6 (3.4:1 ratio, differing only in source of ω-3: G5 (alpha-linolenic acid; G6 (alpha-linolenic, docosahexaenoic and eicosapentaenoic acids, and G7 (alpha-linolenic and docosahexaenoic acids. On day 7 I/R rats underwent cerebral ischemia with bilateral occlusion of common carotid arteries for 1 hour followed by reperfusion for 3 hours. G1 and G3 animals underwent sham operation. Concluded the experiment, animals were decapitated and their brains sliced for red neurons (RN count in CA3 area of the hippocampus. Variables were compared using ANOVA-Tukey test. RESULTS: The use of different mix preparations promoted a decrease in red cell count in all three groups (G5/G6/G7, compared with G2/G4, confirming the protective effect of different oil blends, regardless of ω-3 source. CONCLUSION: Pre-conditioning with mixtures of oils containing high ratio ω-6/ω-3 and low ω-9/ω-6 relationship protects brain neurons against I/R injury in an experimental model.OBJETIVO: Avaliar os efeitos do pré-condicionamento com misturas de óleos contendo relação alta/baixa de ω-6/ω-3 e ω-9/ω-6, respectivamente, em um modelo experimental de isquemia/reperfusão (I/R cerebral. MÉTODOS: Quarenta e dois ratos foram distribu

  5. Post LS1 schedule

    CERN Document Server

    Lamont, M

    2014-01-01

    The scheduling limits for a typical long year taking into account technical stops, machine development, spe- cial physics runs are presented. An attempt is then made to outline a ten year post LS1 schedule taking into account the disparate requirements outlined in the previous talks in this session. The demands on the planned long shutdowns and the impact of these demands on their proposed length will be discussed. The option of using ion running as a pre-shutdown cool-down period will be addressed.

  6. Automated Scheduling Via Artificial Intelligence

    Science.gov (United States)

    Biefeld, Eric W.; Cooper, Lynne P.

    1991-01-01

    Artificial-intelligence software that automates scheduling developed in Operations Mission Planner (OMP) research project. Software used in both generation of new schedules and modification of existing schedules in view of changes in tasks and/or available resources. Approach based on iterative refinement. Although project focused upon scheduling of operations of scientific instruments and other equipment aboard spacecraft, also applicable to such terrestrial problems as scheduling production in factory.

  7. CMS multicore scheduling strategy

    International Nuclear Information System (INIS)

    Yzquierdo, Antonio Pérez-Calero; Hernández, Jose; Holzman, Burt; Majewski, Krista; McCrea, Alison

    2014-01-01

    In the next years, processor architectures based on much larger numbers of cores will be most likely the model to continue 'Moore's Law' style throughput gains. This not only results in many more jobs in parallel running the LHC Run 1 era monolithic applications, but also the memory requirements of these processes push the workernode architectures to the limit. One solution is parallelizing the application itself, through forking and memory sharing or through threaded frameworks. CMS is following all of these approaches and has a comprehensive strategy to schedule multicore jobs on the GRID based on the glideinWMS submission infrastructure. The main component of the scheduling strategy, a pilot-based model with dynamic partitioning of resources that allows the transition to multicore or whole-node scheduling without disallowing the use of single-core jobs, is described. This contribution also presents the experiences made with the proposed multicore scheduling schema and gives an outlook of further developments working towards the restart of the LHC in 2015.

  8. Harmonious personnel scheduling

    NARCIS (Netherlands)

    Fijn van Draat, Laurens; Post, Gerhard F.; Veltman, Bart; Winkelhuijzen, Wessel

    2006-01-01

    The area of personnel scheduling is very broad. Here we focus on the ‘shift assignment problem’. Our aim is to discuss how ORTEC HARMONY handles this planning problem. In particular we go into the structure of the optimization engine in ORTEC HARMONY, which uses techniques from genetic algorithms,

  9. Hybrid job shop scheduling

    NARCIS (Netherlands)

    Schutten, Johannes M.J.

    1995-01-01

    We consider the problem of scheduling jobs in a hybrid job shop. We use the term 'hybrid' to indicate that we consider a lot of extensions of the classic job shop, such as transportation times, multiple resources, and setup times. The Shifting Bottleneck procedure can be generalized to deal with

  10. Practical job shop scheduling

    NARCIS (Netherlands)

    Schutten, Johannes M.J.

    1998-01-01

    The Shifting Bottleneck procedure is an intuitive and reasonably good approximation algorithm for the notoriously difficult classical job shop scheduling problem. The principle of decomposing a classical job shop problem into a series of single-machine problems can also easily be applied to job shop

  11. "Creative" Work Schedules.

    Science.gov (United States)

    Blai, Boris

    Many creative or flexible work scheduling options are becoming available to the many working parents, students, handicapped persons, elderly individuals, and others who are either unable or unwilling to work a customary 40-hour work week. These options may be broadly categorized as either restructured or reduced work time options. The three main…

  12. PR-PR: cross-platform laboratory automation system.

    Science.gov (United States)

    Linshiz, Gregory; Stawski, Nina; Goyal, Garima; Bi, Changhao; Poust, Sean; Sharma, Monica; Mutalik, Vivek; Keasling, Jay D; Hillson, Nathan J

    2014-08-15

    To enable protocol standardization, sharing, and efficient implementation across laboratory automation platforms, we have further developed the PR-PR open-source high-level biology-friendly robot programming language as a cross-platform laboratory automation system. Beyond liquid-handling robotics, PR-PR now supports microfluidic and microscopy platforms, as well as protocol translation into human languages, such as English. While the same set of basic PR-PR commands and features are available for each supported platform, the underlying optimization and translation modules vary from platform to platform. Here, we describe these further developments to PR-PR, and demonstrate the experimental implementation and validation of PR-PR protocols for combinatorial modified Golden Gate DNA assembly across liquid-handling robotic, microfluidic, and manual platforms. To further test PR-PR cross-platform performance, we then implement and assess PR-PR protocols for Kunkel DNA mutagenesis and hierarchical Gibson DNA assembly for microfluidic and manual platforms.

  13. Scheduling techniques in the Request Oriented Scheduling Engine (ROSE)

    Science.gov (United States)

    Zoch, David R.

    1991-01-01

    Scheduling techniques in the ROSE are presented in the form of the viewgraphs. The following subject areas are covered: agenda; ROSE summary and history; NCC-ROSE task goals; accomplishments; ROSE timeline manager; scheduling concerns; current and ROSE approaches; initial scheduling; BFSSE overview and example; and summary.

  14. Location-based Scheduling

    DEFF Research Database (Denmark)

    Andersson, Niclas; Christensen, Knud

    on the market. However, CPM is primarily an activity based method that takes the activity as the unit of focus and there is criticism raised, specifically in the case of construction projects, on the method for deficient management of construction work and continuous flow of resources. To seek solutions...... to the identified limitations of the CPM method, an alternative planning and scheduling methodology that includes locations is tested. Location-based Scheduling (LBS) implies a shift in focus, from primarily the activities to the flow of work through the various locations of the project, i.e. the building. LBS uses...... the graphical presentation technique of Line-of-balance, which is adapted for planning and management of work-flows that facilitates resources to perform their work without interruptions caused by other resources working with other activities in the same location. As such, LBS and Lean Construction share...

  15. Modelling altered fractionation schedules

    International Nuclear Information System (INIS)

    Fowler, J.F.

    1993-01-01

    The author discusses the conflicting requirements of hyperfractionation and accelerated fractionation used in radiotherapy, and the development of computer modelling to predict how to obtain an optimum of tumour cell kill without exceeding normal-tissue tolerance. The present trend is to shorten hyperfractionated schedules from 6 or 7 weeks to give overall times of 4 or 5 weeks as in new schedules by Herskovic et al (1992) and Harari (1992). Very high doses are given, much higher than can be given when ultrashort schedules such as CHART (12 days) are used. Computer modelling has suggested that optimum overall times, to yield maximum cell kill in tumours ((α/β = 10 Gy) for a constant level of late complications (α/β = 3 Gy) would be X or X-1 weeks, where X is the doubling time of the tumour cells in days (Fowler 1990). For median doubling times of about 5 days, overall times of 4 or 5 weeks should be ideal. (U.K.)

  16. Estimating exponential scheduling preferences

    DEFF Research Database (Denmark)

    Hjorth, Katrine; Börjesson, Maria; Engelson, Leonid

    Extended abstract Choice of departure time is a travel choice dimension that transportation planners often need to forecast in appraisal. A traveller may shift departure time in response to changes in expected travel time or travel time variability (TTV) or in response to time-differentiated cong......Extended abstract Choice of departure time is a travel choice dimension that transportation planners often need to forecast in appraisal. A traveller may shift departure time in response to changes in expected travel time or travel time variability (TTV) or in response to time...... from the underlying scheduling preferences (Noland and Small, 1995, Bates et al., 2001, Fosgerau and Karlström, 2010). The scheduling preferences can be formally represented as time-dependent rates of utility derived at different locations. Assuming that the travellers are rational and choose departure......’ departure time choice. The assumption underlying the scheduling approach is that the traveller rationally maximises her total utility obtained during a period of time. The total utility depends on time of departure from the origin and time of arrival to the destination. The total utility is usually assumed...

  17. Generating Variable and Random Schedules of Reinforcement Using Microsoft Excel Macros

    Science.gov (United States)

    Bancroft, Stacie L.; Bourret, Jason C.

    2008-01-01

    Variable reinforcement schedules are used to arrange the availability of reinforcement following varying response ratios or intervals of time. Random reinforcement schedules are subtypes of variable reinforcement schedules that can be used to arrange the availability of reinforcement at a constant probability across number of responses or time.…

  18. Neutron Scattering from fcc Pr and Pr3Tl

    DEFF Research Database (Denmark)

    Birgeneau, R. J.; Als-Nielsen, Jens Aage; Bucher, E.

    1972-01-01

    Elastic-neutron-scattering measurements on the singlet-ground-state ferromagnets fcc Pr and Pr3 Tl are reported. Both exhibit magnetic phase transitions, possibly to a simple ferromagnetic state at 20 and 11.6 °K, respectively. The transitions appear to be of second order although that in fcc Pr...

  19. PR, Lobbyism and Democracy

    DEFF Research Database (Denmark)

    Ørsten, Mark; Willig, Ida; Pedersen, Leif Hemming

    2017-01-01

    The growth of PR in Scandinavia is linked both to the mediatization of politics and to the decline of corporatism. Studies in Sweden and Norway suggest that one consequence of these changes is the increasing number of politicians who find new careers as lobbyists in the private sector. In this st......The growth of PR in Scandinavia is linked both to the mediatization of politics and to the decline of corporatism. Studies in Sweden and Norway suggest that one consequence of these changes is the increasing number of politicians who find new careers as lobbyists in the private sector....... Still, 89 percent of all the registered job positions fall outside of lobbyism. 11 percent of the job positions fall within the wider field associated with the emerging field of policy professionals (including lobbyism), while lobbyism on its own accounts for 2 percent of the job positions....

  20. NRC comprehensive records disposition schedule

    International Nuclear Information System (INIS)

    1982-07-01

    Effective January 1, 1982, NRC will institute records retention and disposal practices in accordance with the approved Comprehensive Records Disposition Schedule (CRDS). CRDS is comprised of NRC Schedules (NRCS) 1 to 4 which apply to the agency's program or substantive records and General Records Schedules (GRS) 1 to 22 which apply to housekeeping or facilitative records. The schedules are assembled functionally/organizationally to facilitate their use. Preceding the records descriptions and disposition instructions for both NRCS and GRS, there are brief statements on the organizational units which accumulate the records in each functional area, and other information regarding the schedules' applicability

  1. Practical quantum appointment scheduling

    Science.gov (United States)

    Touchette, Dave; Lovitz, Benjamin; Lütkenhaus, Norbert

    2018-04-01

    We propose a protocol based on coherent states and linear optics operations for solving the appointment-scheduling problem. Our main protocol leaks strictly less information about each party's input than the optimal classical protocol, even when considering experimental errors. Along with the ability to generate constant-amplitude coherent states over two modes, this protocol requires the ability to transfer these modes back-and-forth between the two parties multiple times with very low losses. The implementation requirements are thus still challenging. Along the way, we develop tools to study quantum information cost of interactive protocols in the finite regime.

  2. Scheduling theory, algorithms, and systems

    CERN Document Server

    Pinedo, Michael L

    2016-01-01

    This new edition of the well-established text Scheduling: Theory, Algorithms, and Systems provides an up-to-date coverage of important theoretical models in the scheduling literature as well as important scheduling problems that appear in the real world. The accompanying website includes supplementary material in the form of slide-shows from industry as well as movies that show actual implementations of scheduling systems. The main structure of the book, as per previous editions, consists of three parts. The first part focuses on deterministic scheduling and the related combinatorial problems. The second part covers probabilistic scheduling models; in this part it is assumed that processing times and other problem data are random and not known in advance. The third part deals with scheduling in practice; it covers heuristics that are popular with practitioners and discusses system design and implementation issues. All three parts of this new edition have been revamped, streamlined, and extended. The reference...

  3. Uma abordagem prática para a programação de setup e para o dimensionamento de lote em uma indústria têxtil A practical approach to lot and setup scheduling at a textile firm

    Directory of Open Access Journals (Sweden)

    Umit Akinc

    1995-04-01

    Full Text Available Estuda-se a programação de preparações de máquinas e atividades produtivas de uma indústria têxtil, localizada na Carolina do Norte, EUA. A firma enfrenta o problema de programar a produção das encomendas dos clientes em diversos teares circulares, que admitem diferentes configurações, mediante instalação de diferentes cilindros, para tecer vários tipos de malha crua. Dado um conjunto de requisitos, para diferentes estilos de malha, o problema consiste em decidir quanto à configuração específica a ser usada em cada máquina e quanto aos específicos pedidos a serem processados nessas configurações. O problema é formulado como um modelo de programação linear inteira. O objetivo é a maximização da contribuição total de todos os pedidos programados sujeitos a restrições impostas à capacidade de produção pelas máquinas e pelas operações de preparação, considerando explicitamente os efeitos dos ajustes programados e das restrições ao atendimento das encomendas dos clientes. São discutidas várias tentativas de solução. Projeta-se um procedimento aproximado que progressivamente adiciona novos ajustes com base em várias heurísticas por meio das quais o "valor" das configurações candidatas às máquinas é avaliado. Essas heurísticas podem ser desenvolvidas tanto para um procedimento interno de programação quanto para uso do programador humano, interativamente, num ambiente de microcomputador.This is a study of scheduling of setups and production activities of a textile firm, located in North Carolina, USA. The firm faces the problem of scheduling customer orders on a number of knitting machines which can be configured differently by installing different knitting cylinders, to knit various types of greige cloth. Given a set of requirements for different styles of cloth, the problem is to decide on the specific configurations to be used on each machine and on the specific orders to be run on these

  4. Perceptions of randomized security schedules.

    Science.gov (United States)

    Scurich, Nicholas; John, Richard S

    2014-04-01

    Security of infrastructure is a major concern. Traditional security schedules are unable to provide omnipresent coverage; consequently, adversaries can exploit predictable vulnerabilities to their advantage. Randomized security schedules, which randomly deploy security measures, overcome these limitations, but public perceptions of such schedules have not been examined. In this experiment, participants were asked to make a choice between attending a venue that employed a traditional (i.e., search everyone) or a random (i.e., a probability of being searched) security schedule. The absolute probability of detecting contraband was manipulated (i.e., 1/10, 1/4, 1/2) but equivalent between the two schedule types. In general, participants were indifferent to either security schedule, regardless of the probability of detection. The randomized schedule was deemed more convenient, but the traditional schedule was considered fairer and safer. There were no differences between traditional and random schedule in terms of perceived effectiveness or deterrence. Policy implications for the implementation and utilization of randomized schedules are discussed. © 2013 Society for Risk Analysis.

  5. Préface

    Science.gov (United States)

    Chardonnet, Christian; Millot, Guy

    2006-10-01

    COLOQ, réunion nationale biennale initiée en 1988 par la communauté française des lasers, de l'optique non linéaire et de l'optique quantique atteint sa neuvième édition. Depuis sa création, les objectifs poursuivis sont les suivants : - réunir la communauté française des lasers, de l'optique non linéaire et de l'optique quantique, en dépassant les clivages fondamental/appliqué, recherche publique/industrielle, - faire le point sur les avancées récentes, - permettre aux jeunes chercheurs de se rencontrer, de s'exprimer et de s'aguerrir au plan national. Le but est que tout thésard du domaine de l'optique puisse participer à COLOQ une fois durant sa thèse, présenter son travail et de se confronter à la communauté de l'optique. COLOQ9 s'est tenu, pour sa 9e édition, sur le campus universitaire de Dijon, du 7 au 9 septembre 2005. Il a été une grande réussite : nombre de participants (255) et de présentations scientifiques record (148 affiches), forte représentation des industriels (15) et participation d'environ 200 lycéens aux conférences grand public. Le nombre plus élevé que prévu d'affiches a rendu un peu serrée leur présentation : une attention particulière sera portée à cet aspect lors des prochaines éditions. Ces journées ont été consacrées à des conférences invitées données par des scientifiques de haut niveau et à des présentations sous forme d'affiches. Une plage de temps importante a été réservée pour des discussions autour des affiches. À proximité immédiate de la salle de conférence, l'exposition de matériels spécialisés pour les lasers, l'optique et l'optoélectronique a été une occasion pour les jeunes participants de découvrir et contacter les industriels et les autres grands acteurs de l'optique. L'année 2005 ayant été l'année mondiale de la physique, COLOQ9 a retenu comme thème central ”1905-2005 : à propos d'Einstein". Plusieurs grandes conférences ont été dédiées à ce th

  6. Présentation

    Directory of Open Access Journals (Sweden)

    Stéphane Haber

    2010-08-01

    Full Text Available Les articles réunis dans ce dossier de la revue Astérion portent sur la première génération de la Théorie critique (dont Max Horkheimer, Walter Benjamin, Theodor W. Adorno, Herbert Marcuse et Erich Fromm constituent sans doute les figures principales. Ils se concentrent plus précisément sur les contributions philosophiques qui marquèrent la période ouverte par l’accession de Horkheimer à la direction de l’Institut de recherches sociales (1931 et close par la publication en 1944 de Dialektik...

  7. 2007 Wholesale Power Rate Schedules : 2007 General Rate Schedule Provisions.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    2006-11-01

    This schedule is available for the contract purchase of Firm Power to be used within the Pacific Northwest (PNW). Priority Firm (PF) Power may be purchased by public bodies, cooperatives, and Federal agencies for resale to ultimate consumers, for direct consumption, and for Construction, Test and Start-Up, and Station Service. Rates in this schedule are in effect beginning October 1, 2006, and apply to purchases under requirements Firm Power sales contracts for a three-year period. The Slice Product is only available for public bodies and cooperatives who have signed Slice contracts for the FY 2002-2011 period. Utilities participating in the Residential Exchange Program (REP) under Section 5(c) of the Northwest Power Act may purchase Priority Firm Power pursuant to the Residential Exchange Program. Rates under contracts that contain charges that escalate based on BPA's Priority Firm Power rates shall be based on the three-year rates listed in this rate schedule in addition to applicable transmission charges. This rate schedule supersedes the PF-02 rate schedule, which went into effect October 1, 2001. Sales under the PF-07 rate schedule are subject to BPA's 2007 General Rate Schedule Provisions (2007 GRSPs). Products available under this rate schedule are defined in the 2007 GRSPs. For sales under this rate schedule, bills shall be rendered and payments due pursuant to BPA's 2007 GRSPs and billing process.

  8. Athletes as PR Spokespeople: the NFL’s “A Crucial Catch” PR Campaign Explored

    Directory of Open Access Journals (Sweden)

    Chyna Teresa Trible

    2015-06-01

    Full Text Available The results of the present study were presented at the 2015 International Conference on Communication and Management and examined the National Football League’s (NFL “A Crucial Catch” breast cancer awareness campaign in the United States. Variables included identification with NFL athletes, exposure to the campaign, NFL fanship, and intention to schedule a breast cancer screening (the action promoted by NFL athletes in this PR campaign. Social media outlets and an e-mail listserv of the School of Communication at Rochester Institute of Technology in Rochester, New York, USA were employed to solicit participants (n=119 in a survey. A questionnaire composed of items modified from Brown and Bocarnea’s (2007a Celebrity-Persona Parasocial Identification Scale to investigate identification with NFL athletes was used. Statistically significant relationships were found between identification with NFL athletes and exposure, identification with NFL athletes and intention to schedule a breast cancer screening, and identification with NFL athletes and NFL fanship. NFL fanship was also significantly related to exposure to the campaign. Implications for future studies analyzing PR campaigns produced by the NFL and FIFA are suggested.

  9. The reaction index and positivity ratio revisited

    DEFF Research Database (Denmark)

    Andersen, Klaus Ejner; Andersen, Flemming

    2008-01-01

    BACKGROUND AND OBJECTIVES: Assessing the quality of patch test preparations continues to be a challenge. 2 parameters, the reaction index (RI) and positivity ratio (PR), have been proposed as quality indicators by the Information Network of Departments of Dermatology (IVDK). The value of these st......BACKGROUND AND OBJECTIVES: Assessing the quality of patch test preparations continues to be a challenge. 2 parameters, the reaction index (RI) and positivity ratio (PR), have been proposed as quality indicators by the Information Network of Departments of Dermatology (IVDK). The value...

  10. Rostering and Task Scheduling

    DEFF Research Database (Denmark)

    Dohn, Anders Høeg

    . The rostering process is non-trivial and especially when service is required around the clock, rostering may involve considerable effort from a designated planner. Therefore, in order to minimize costs and overstaffing, to maximize the utilization of available staff, and to ensure a high level of satisfaction...... as possible to the available staff, while respecting various requirements and rules and while including possible transportation time between tasks. This thesis presents a number of industrial applications in rostering and task scheduling. The applications exist within various contexts in health care....... Mathematical and logic-based models are presented for the problems considered. Novel components are added to existing models and the modeling decisions are justified. In one case, the model is solved by a simple, but efficient greedy construction heuristic. In the remaining cases, column generation is applied...

  11. Scheduling the powering tests

    CERN Document Server

    Barbero-Soto, E; Casas-Lino, M P; Fernandez-Robles, C; Foraz, K; Pojer, M; Saban, R; Schmidt, R; Solfaroli-Camillocci, M; Vergara-Fernandez, A

    2008-01-01

    The Large Hadron Collider is now entering in its final phase before receiving beam, and the activities at CERN between 2007 and 2008 have shifted from installation work to the commissioning of the technical systems ("hardware commissioning"). Due to the unprecedented complexity of this machine, all the systems are or will be tested as far as possible before the cool-down starts. Systems are firstly tested individually before being globally tested together. The architecture of LHC, which is partitioned into eight cryogenically and electrically independent sectors, allows the commissioning on a sector by sector basis. When a sector reaches nominal cryogenic conditions, commissioning of the magnet powering system to nominal current for all magnets can be performed. This paper briefly describes the different activities to be performed during the powering tests of the superconducting magnet system and presents the scheduling issues raised by co-activities as well as the management of resources.

  12. On PR group classes and PR algebra membership

    International Nuclear Information System (INIS)

    Lebedenko, V.M.

    1978-01-01

    The necessary and sufficient conditions are found for the membership of Lee algebras to PR algebra class, to algebras with commutation relations of [Hsub(i), Hsub(j)]=rsub(ij)Hsub(i) (i< j) type. Due to this, a criterion is obtained for the membership of the Lee froups to PR group classes, connected and simply connected Lee groups, which Lee algebras are PR algebras

  13. Escalator: An Autonomous Scheduling Scheme for Convergecast in TSCH

    Directory of Open Access Journals (Sweden)

    Sukho Oh

    2018-04-01

    Full Text Available Time Slotted Channel Hopping (TSCH is widely used in the industrial wireless sensor networks due to its high reliability and energy efficiency. Various timeslot and channel scheduling schemes have been proposed for achieving high reliability and energy efficiency for TSCH networks. Recently proposed autonomous scheduling schemes provide flexible timeslot scheduling based on the routing topology, but do not take into account the network traffic and packet forwarding delays. In this paper, we propose an autonomous scheduling scheme for convergecast in TSCH networks with RPL as a routing protocol, named Escalator. Escalator generates a consecutive timeslot schedule along the packet forwarding path to minimize the packet transmission delay. The schedule is generated autonomously by utilizing only the local routing topology information without any additional signaling with other nodes. The generated schedule is guaranteed to be conflict-free, in that all nodes in the network could transmit packets to the sink in every slotframe cycle. We implement Escalator and evaluate its performance with existing autonomous scheduling schemes through a testbed and simulation. Experimental results show that the proposed Escalator has lower end-to-end delay and higher packet delivery ratio compared to the existing schemes regardless of the network topology.

  14. Escalator: An Autonomous Scheduling Scheme for Convergecast in TSCH.

    Science.gov (United States)

    Oh, Sukho; Hwang, DongYeop; Kim, Ki-Hyung; Kim, Kangseok

    2018-04-16

    Time Slotted Channel Hopping (TSCH) is widely used in the industrial wireless sensor networks due to its high reliability and energy efficiency. Various timeslot and channel scheduling schemes have been proposed for achieving high reliability and energy efficiency for TSCH networks. Recently proposed autonomous scheduling schemes provide flexible timeslot scheduling based on the routing topology, but do not take into account the network traffic and packet forwarding delays. In this paper, we propose an autonomous scheduling scheme for convergecast in TSCH networks with RPL as a routing protocol, named Escalator. Escalator generates a consecutive timeslot schedule along the packet forwarding path to minimize the packet transmission delay. The schedule is generated autonomously by utilizing only the local routing topology information without any additional signaling with other nodes. The generated schedule is guaranteed to be conflict-free, in that all nodes in the network could transmit packets to the sink in every slotframe cycle. We implement Escalator and evaluate its performance with existing autonomous scheduling schemes through a testbed and simulation. Experimental results show that the proposed Escalator has lower end-to-end delay and higher packet delivery ratio compared to the existing schemes regardless of the network topology.

  15. Sport Tournament Automated Scheduling System

    OpenAIRE

    Raof R. A. A; Sudin S.; Mahrom N.; Rosli A. N. C

    2018-01-01

    The organizer of sport events often facing problems such as wrong calculations of marks and scores, as well as difficult to create a good and reliable schedule. Most of the time, the issues about the level of integrity of committee members and also issues about errors made by human came into the picture. Therefore, the development of sport tournament automated scheduling system is proposed. The system will be able to automatically generate the tournament schedule as well as automatically calc...

  16. NRC comprehensive records disposition schedule

    International Nuclear Information System (INIS)

    1992-03-01

    Title 44 United States Code, ''Public Printing and Documents,'' regulations cited in the General Services Administration's (GSA) ''Federal Information Resources Management Regulations'' (FIRMR), Part 201-9, ''Creation, Maintenance, and Use of Records,'' and regulation issued by the National Archives and Records Administration (NARA) in 36 CFR Chapter XII, Subchapter B, ''Records Management,'' require each agency to prepare and issue a comprehensive records disposition schedule that contains the NARA approved records disposition schedules for records unique to the agency and contains the NARA's General Records Schedules for records common to several or all agencies. The approved records disposition schedules specify the appropriate duration of retention and the final disposition for records created or maintained by the NRC. NUREG-0910, Rev. 2, contains ''NRC's Comprehensive Records Disposition Schedule,'' and the original authorized approved citation numbers issued by NARA. Rev. 2 totally reorganizes the records schedules from a functional arrangement to an arrangement by the host office. A subject index and a conversion table have also been developed for the NRC schedules to allow staff to identify the new schedule numbers easily and to improve their ability to locate applicable schedules

  17. Message Scheduling and Forwarding in Congested DTNs

    KAUST Repository

    Elwhishi, Ahmed; Ho, Pin-Han; Shihada, Basem

    2012-01-01

    Multi-copy utility-based routing has been considered as one of the most applicable approaches to effective message delivery in Delay Tolerant Networks (DTNs). By allowing multiple message replicas launched, the ratio of message delivery or delay can be significantly reduced compared with other counterparts. Such an advantage, nonetheless, is at the expense of taking more buffer space at each node and higher complexity in message forwarding decisions. This paper investigates an efficient message scheduling and dropping policy via analytical modeling approach, aiming to achieve optimal performance in terms of message delivery delay. Extensive simulation results, based on a synthetic mobility model and real mobility traces, show that the proposed scheduling framework can achieve superb performance against its counterparts in terms of delivery delay.

  18. Message Scheduling and Forwarding in Congested DTNs

    KAUST Repository

    Elwhishi, Ahmed

    2012-08-19

    Multi-copy utility-based routing has been considered as one of the most applicable approaches to effective message delivery in Delay Tolerant Networks (DTNs). By allowing multiple message replicas launched, the ratio of message delivery or delay can be significantly reduced compared with other counterparts. Such an advantage, nonetheless, is at the expense of taking more buffer space at each node and higher complexity in message forwarding decisions. This paper investigates an efficient message scheduling and dropping policy via analytical modeling approach, aiming to achieve optimal performance in terms of message delivery delay. Extensive simulation results, based on a synthetic mobility model and real mobility traces, show that the proposed scheduling framework can achieve superb performance against its counterparts in terms of delivery delay.

  19. Schedules of Controlled Substances: Temporary Placement of 4-Fluoroisobutyryl Fentanyl into Schedule I. Temporary scheduling order.

    Science.gov (United States)

    2017-05-03

    The Administrator of the Drug Enforcement Administration is issuing this temporary scheduling order to schedule the synthetic opioid, N-(4-fluorophenyl)-N-(1-phenethylpiperidin-4-yl)isobutyramide (4-fluoroisobutyryl fentanyl or para-fluoroisobutyryl fentanyl), and its isomers, esters, ethers, salts and salts of isomers, esters, and ethers, into schedule I pursuant to the temporary scheduling provisions of the Controlled Substances Act. This action is based on a finding by the Administrator that the placement of 4-fluoroisobutyryl fentanyl into schedule I of the Controlled Substances Act is necessary to avoid an imminent hazard to the public safety. As a result of this order, the regulatory controls and administrative, civil, and criminal sanctions applicable to schedule I controlled substances will be imposed on persons who handle (manufacture, distribute, reverse distribute, import, export, engage in research, conduct instructional activities or chemical analysis, or possess), or propose to handle, 4-fluoroisobutyryl fentanyl.

  20. STRATEGIJSKA ULOGA PR U SPORTU

    Directory of Open Access Journals (Sweden)

    Duško Tomić

    2005-05-01

    Full Text Available PR in the modern world are developed with rapid speed and become important aspect of strategic management. Modern menagers are very interesting in PR and they observe that there is not successful strategy without experiance theory and practice in PR. The goals must be defined, basic phylosophy to, and managers must take responsability and describe everithing what they have to do. It must be financial fond and evaluation must be done

  1. Préface

    Directory of Open Access Journals (Sweden)

    Sylvie Duvillard

    2010-09-01

    Full Text Available Le moment est opportun, la question foncière est de retour, légitimée par presque une décennie (2001-2008 d’augmentation continue des prix de l’immobilier. De « sommets » , en articles de presse, la montagne et les Alpes en particulier font l’objet, dans ce domaine, d’une attention toute particulière. Le contexte est ici délicat. Les sociétés alpines sont partagées entre désir de préservation d’une forte identité montagnarde et crainte d’une « déprise » économique (agricole, touristique et/...

  2. Présentation

    Directory of Open Access Journals (Sweden)

    Frédéric Hitzel

    2009-05-01

    Full Text Available « À ma connaissance, il n'est pas de compagnon plus fidèle à ses engagements, plus prompt à honorer les faveurs reçues, plus empressé à offrir ses services, et ce à moindre frais, que le livre. Je ne connais aucun arbre qui ait un fruit plus succulent, plus précoce, plus aisé à cueillir, plus disponible à tout moment, comme le livre. Je ne sais pas de produit qui, malgré son jeune âge et la proximité de sa naissance, la facilité avec laquelle on peut se le procurer, la modicité de son prix, a...

  3. Présentation

    Directory of Open Access Journals (Sweden)

    Agnès Bouvier

    2012-02-01

    Full Text Available Le 7 juin 1844, Flaubert écrit à Louis de Cormenin : « J’ai lu Candide vingt fois, je l’ai traduit en anglais et je l’ai encore relu de temps à autre. » Quel que soit le degré de sérieux de cette affirmation, elle témoigne d’un intérêt précoce de Flaubert pour l’acte de traduire. De même, l’écrivain attachait de l’importance aux traductions qu’il lisait : « Je relis maintenant Don Quichotte dans la nouvelle traduction de Damas Hinard » écrit-il à Louise Colet en novembre 1847. Il lui arrivait...

  4. Présentation

    Directory of Open Access Journals (Sweden)

    Aurore Monod Becquelin

    2010-09-01

    Full Text Available Les recherches présentées dans ce volume sont issues des travaux de chercheurs qui se réunissent régulièrement depuis 2005 sur le thème de l’« Agentivité ». Ce groupe rassemble des ethnologues et des linguistes du Laboratoire d’ethnologie et de sociologie comparative (umr 7186, cnrs/université Paris Ouest Nanterre La Défense, du Laboratoire d’anthropologie sociale (umr 7130, Collège de France/ehess Paris/cnrs, de l’École des hautes études en sciences sociales, de l’Institut des hautes étude...

  5. State diagram of Pr-Bi system

    International Nuclear Information System (INIS)

    Abulkhaev, V.L.; Ganiev, I.N.

    1994-01-01

    By means of thermal differential analysis, X-ray and microstructural analysis the state diagram of Pr-Bi system was studied. Following intermetallic compounds were defined in the system: Pr 2 Bi, Pr 5 Bi 3 , Pr 4 Bi 3 , Pr Bi, PrBi 2 , Pr 2 Bi, Pr 5 Bi 3 , Pr 4 Bi 3 and PrBi 2 . The data analysis on Ln-Bi diagram allowed to determine the regularity of change of properties of intermetallic compounds in the line of rare earth elements of cerium subgroup.

  6. Practical principles in appointment scheduling

    NARCIS (Netherlands)

    Kuiper, A.; Mandjes, M.

    2015-01-01

    Appointment schedules aim at achieving a proper balance between the conflicting interests of the service provider and her clients: a primary objective of the service provider is to fully utilize her available time, whereas clients want to avoid excessive waiting times. Setting up schedules that

  7. Nontraditional work schedules for pharmacists.

    Science.gov (United States)

    Mahaney, Lynnae; Sanborn, Michael; Alexander, Emily

    2008-11-15

    Nontraditional work schedules for pharmacists at three institutions are described. The demand for pharmacists and health care in general continues to increase, yet significant material changes are occurring in the pharmacy work force. These changing demographics, coupled with historical vacancy rates and turnover trends for pharmacy staff, require an increased emphasis on workplace changes that can improve staff recruitment and retention. At William S. Middleton Memorial Veterans Affairs Hospital in Madison, Wisconsin, creative pharmacist work schedules and roles are now mainstays to the recruitment and retention of staff. The major challenge that such scheduling presents is the 8 hours needed to prepare a six-week schedule. Baylor Medical Center at Grapevine in Dallas, Texas, has a total of 45 pharmacy employees, and slightly less than half of the 24.5 full-time-equivalent staff work full-time, with most preferring to work one, two, or three days per week. As long as the coverage needs of the facility are met, Envision Telepharmacy in Alpine, Texas, allows almost any scheduling arrangement preferred by individual pharmacists or the pharmacist group covering the facility. Staffing involves a great variety of shift lengths and intervals, with shifts ranging from 2 to 10 hours. Pharmacy leaders must be increasingly aware of opportunities to provide staff with unique scheduling and operational enhancements that can provide for a better work-life balance. Compressed workweeks, job-sharing, and team scheduling were the most common types of alternative work schedules implemented at three different institutions.

  8. Modeling the Cray memory scheduler

    Energy Technology Data Exchange (ETDEWEB)

    Wickham, K.L.; Litteer, G.L.

    1992-04-01

    This report documents the results of a project to evaluate low cost modeling and simulation tools when applied to modeling the Cray memory scheduler. The specific tool used is described and the basics of the memory scheduler are covered. Results of simulations using the model are discussed and a favorable recommendation is made to make more use of this inexpensive technology.

  9. Flexible Work Schedules. ERIC Digest.

    Science.gov (United States)

    Kerka, Sandra

    Flexible work schedules are one response to changes in the composition of the work force, new life-styles, and changes in work attitudes. Types of alternative work schedules are part-time and temporary employment, job sharing, and flextime. Part-time workers are a diverse group--women, the very young, and older near-retirees. Although part-time…

  10. AP1000 construction schedule

    International Nuclear Information System (INIS)

    Winters, J.W.

    2001-01-01

    Westinghouse performed this study as part of EPRI interest in advancing the use of computer aided processes to reduce the cost of nuclear power plants. EPRI believed that if one could relate appropriate portions of an advanced light water reactor plant model to activities in its construction sequence, and this relationship could be portrayed visually, then optimization of the construction sequence could be developed as never before. By seeing a 3-D representation of the plant at any point in its construction sequence, more informed decisions can be made on the feasibility or attractiveness of follow on or parallel steps in the sequence. The 3-D representation of construction as a function of time (4-D) could also increase the confidence of potential investors concerning the viability of the schedule and the plant ultimate cost. This study performed by Westinghouse confirmed that it is useful to be able to visualize a plant construction in 3-D as a function of time in order to optimize the sequence of construction activities. (author)

  11. TECHNICAL COORDINATION SCHEDULE & INTEGRATION

    CERN Multimedia

    W. Zeuner

    Introduction The endgame of CMS installation in the underground cavern is in full swing, with several major milestones having been passed since the last CMS week. The Tracker was installed inside the Vactank just before the CERN end-of-year shutdown. Shortly after the reopening in 2008, the two remaining endcap disks, YE-2 and YE-1, were lowered, marking the completion of eight years of assembly in the surface building SX5. The remaining tasks, before the detector can be closed for the Cosmic Run At Four Tesla (CRAFT), are the installation of the thermal shields, the cabling of the negative endcap, the cabling of the tracker and the beam pipe installation. In addition to these installation tasks, a test closure of the positive endcap is planned just before the installation of the central beam pipe. The schedule is tight and complicated but the goal to close CMS by the end of May for a cosmic test with magnetic field remains feasible. Safety With all large components now being underground, the shortage...

  12. The PR Officer's Survival Kit.

    Science.gov (United States)

    Woodrum, Robert L.

    1996-01-01

    A former corporate public relations (PR) professional shares strategies for communicating and cooperating with the chief executive officer, and particularly for coping with differences in perceptions of the public relations officer's role. Basic attributes of a successful PR professional are outlined: good communication skills, an analytical…

  13. PR's involvement in International Cooperation

    NARCIS (Netherlands)

    Anonymous,

    1995-01-01

    In The Netherlands, the Research Station for Cattle, Sheep and Horse Husbandry (in Dutch abbreviated as PR) bridges the gap between more basic and disciplinary research done at universities and research institutes on the one hand and the extension service and the farmers on the other hand. The PR

  14. Prólogo

    Directory of Open Access Journals (Sweden)

    Alta Hooker

    2013-02-01

    Full Text Available Este volumen No. 11 presenta una compilación estructurada en 6 secciones temáticas las cuales comprenden 9 artículos. La primera sección en Educación, presenta los artículos: Métodos de enseñanza de Física en la modalidad a distancia en el instituto sabatino “Esperanza”,en el municipio de Siuna; y, Comportamiento disciplinario en la escuela “Niño Jesús”, Siuna, Región Autónoma Atlántico Norte, 2011. La segunda sección, titulada Educación Superior en la Costa Caribe Nicaragüense presenta los artículos: Formación de los docentes de la URACCAN en el Área de Recursos Naturales; asimismo, Pertinencia de los programas para el aprendizaje del inglés en Administración de Empresas, Recinto Nueva Guinea y Prácticas de campo en la formación de estudiantes de Ingeniería en Zootecnia, URACCAN Nueva Guinea. La tercera sección denominada Revitalización Lingüística y Cultural comprende dos artículos: Etno-matemática en indígenas ulwas, comunidad de Karawala, Región Autónoma Atlántico Sur, Nicaragua y Ma-Kuagro: Elementos de la cultura de San Basilio Palenque, Colombia, y su incidencia en las prácticas pedagógicas. La cuarta sección Cultura Indígena y Afrodescendiente comprende un artículo: Economía indígena en la comunidad de Wasakín, municipio de Rosita, RAAN. Clausura la quinta sección denominada Ciencias Sociales, el artículo La república Bolivariana de Venezuela y Nicaragua, en el marco del acuerdo energético.

  15. Scheduling reinforcement about once a day.

    Science.gov (United States)

    Eckerman, D A

    1999-04-01

    A pigeon earned its daily food by pecking a key according to reinforcement schedules that produced food about once per day. Fixed-interval (FI), Fixed-time (FT), and various complex schedules were arranged to demonstrate the degree to which a scalloped pattern of responding remained. Pausing continued until about an hour before the reinforcer could be earned for FIs of 12, 24, and 48 h. Pausing was not as long for FIs of 18, 19, and 23 h. Pausing of about 24 h was seen for FI 36 h. FT 24 h produced continued responding but at a diminished frequency. The pattern of responding was strongly controlled by the schedule of reinforcement and seemed relatively independent of the cycle of human activity in the surrounding laboratory. Effects of added ratio contingencies and of signaling the availability of reinforcement in FT were also examined. Signaled FTs of 5 min-3 h produced more responding during the signal (autoshaping) than did FTs of 19 or 24 h.

  16. New Approaches to Irrigation Scheduling of Vegetables

    Directory of Open Access Journals (Sweden)

    Michael D. Cahn

    2017-04-01

    Full Text Available Using evapotranspiration (ET data for scheduling irrigations on vegetable farms is challenging due to imprecise crop coefficients, time consuming computations, and the need to simultaneously manage many fields. Meanwhile, the adoption of soil moisture monitoring in vegetables has historically been limited by sensor accuracy and cost, as well as labor required for installation, removal, and collection of readings. With recent improvements in sensor technology, public weather-station networks, satellite and aerial imaging, wireless communications, and cloud computing, many of the difficulties in using ET data and soil moisture sensors for irrigation scheduling of vegetables can now be addressed. Web and smartphone applications have been developed that automate many of the calculations involved in ET-based irrigation scheduling. Soil moisture sensor data can be collected through wireless networks and accessed using web browser or smartphone apps. Energy balance methods of crop ET estimation, such as eddy covariance and Bowen ratio, provide research options for further developing and evaluating crop coefficient guidelines of vegetables, while recent advancements in surface renewal instrumentation have led to a relatively low-cost tool for monitoring crop water requirement in commercial farms. Remote sensing of crops using satellite, manned aircraft, and UAV platforms may also provide useful tools for vegetable growers to evaluate crop development, plant stress, water consumption, and irrigation system performance.

  17. Gain scheduling using the Youla parameterization

    DEFF Research Database (Denmark)

    Niemann, Hans Henrik; Stoustrup, Jakob

    1999-01-01

    Gain scheduling controllers are considered in this paper. The gain scheduling problem where the scheduling parameter vector cannot be measured directly, but needs to be estimated is considered. An estimation of the scheduling vector has been derived by using the Youla parameterization. The use...... in connection with H_inf gain scheduling controllers....

  18. Adaptive scheduling with postexamining user selection under nonidentical fading

    KAUST Repository

    Gaaloul, Fakhreddine

    2012-11-01

    This paper investigates an adaptive scheduling algorithm for multiuser environments with statistically independent but nonidentically distributed (i.n.d.) channel conditions. The algorithm aims to reduce feedback load by sequentially and arbitrarily examining the user channels. It also provides improved performance by realizing postexamining best user selection. The first part of the paper presents new formulations for the statistics of the signal-to-noise ratio (SNR) of the scheduled user under i.n.d. channel conditions. The second part capitalizes on the findings in the first part and presents various performance and processing complexity measures for adaptive discrete-time transmission. The results are then extended to investigate the effect of outdated channel estimates on the statistics of the scheduled user SNR, as well as some performance measures. Numerical results are provided to clarify the usefulness of the scheduling algorithm under perfect or outdated channel estimates. © 1967-2012 IEEE.

  19. Constraint-based scheduling applying constraint programming to scheduling problems

    CERN Document Server

    Baptiste, Philippe; Nuijten, Wim

    2001-01-01

    Constraint Programming is a problem-solving paradigm that establishes a clear distinction between two pivotal aspects of a problem: (1) a precise definition of the constraints that define the problem to be solved and (2) the algorithms and heuristics enabling the selection of decisions to solve the problem. It is because of these capabilities that Constraint Programming is increasingly being employed as a problem-solving tool to solve scheduling problems. Hence the development of Constraint-Based Scheduling as a field of study. The aim of this book is to provide an overview of the most widely used Constraint-Based Scheduling techniques. Following the principles of Constraint Programming, the book consists of three distinct parts: The first chapter introduces the basic principles of Constraint Programming and provides a model of the constraints that are the most often encountered in scheduling problems. Chapters 2, 3, 4, and 5 are focused on the propagation of resource constraints, which usually are responsibl...

  20. Préface

    Science.gov (United States)

    Aspect, Alain

    2004-11-01

    COLOQ est une conférence regroupant, tous les deux ans, la communauté scientifique et industrielle nationale travaillant dans les domaines des lasers, de l'optique non-linéaire et de l'optique quantique. Elle s'est tenue pour sa huitième édition à Toulouse, du 3 au 5 septembre 2004, sur le campus de I'INSA. Comme il est de tradition tous les quatre ans, COLOQ était couplé avec Horizons de l'optique, avec en particulier une journée commune dont le programme avait été préparé en concertation par les deux comités scientifiques. Depuis sa création, COLOQ a pour but de favoriser les rencontres entre les chercheurs des différents laboratoires nationaux publics ou privés travaillant sur les lasers et l'optique quantique au sens large. C'est un moyen privilégié de resserrer les liens de cette communauté et d'y intégrer les jeunes chercheurs. Ces derniers y trouvent l'occasion de se connaître, de se faire connaître, de découvrir la communauté à laquelle ils appartiennent et d'élargir leurs connaissances des thèmes qui la structurent. La participation de 230 chercheurs et d'une vingtaine d'exposants de matériels spécialisés dans les lasers et l'optoélectronique témoigne de la vitalité de COLOQ et de son audience dans les laboratoires et chez les industriels de l'optique. Le programme de COLOQ 8 comportait d'une vingtaine de conférences générales données par des chercheurs de renom international, et des séances de communications par affiches, occasions privilégiées de rencontres et d'échanges. Les exposés ont porté sur des sujets particulièrement actifs au niveau national et international, avec un accent sur des thèmes importants pour la région toulousaine : contrôle cohérent, optique et nanosciences, optique et astronomie, sans oublier la traditionnelle rubrique phénomènes fondamentaux, éclectique pour ne pas dire hétéroclite, mais si représentative d'une des ambitions de COLOQ qui est d'offrir à ses participants une

  1. Préface

    Science.gov (United States)

    Ouerdane, Youcef; Laporte, Pierre

    2005-06-01

    L'objectif de la série de colloques UVX est de réunir, au rythme d'une fois tous les deux ans, les scientifiques et industriels travaillant dans le domaine du développement des sources de photon de grande énergie (UV, VUV, et X) et de leurs applications. En particulier cette manifestation est l'occasion de faire se rencontrer une communauté très pluridisciplinaire (physique, chimie, biologie, sciences de l'univers) liée à des domaines en forte évolution technologique (lasers et rayonnement synchrotron notamment). Le colloque UVX 2004 s'est tenu au Palais des Congrès de Saint-Étienne (42000) du 7 au 11 juin 2004. La période écoulée depuis l'édition précédente (Oléron 2002) a été particulièrement active dans tous les domaines concernés : grands projets de sources, méthodes de diagnostic au sens large. Une nouvelle fois on constate que le bref et l'ultra-bref ont une place privilégiée, qu'il s'agisse du travail sur les accélérateurs ou sur les lasers qui, bien sûr, dans la course aux temps courts remportent la palme avec la présence de spécialistes du domaine attoseconde. La communauté représentée a la chance d'être en prise directe avec de très grands projets en phase active de réalisation comme le Laser Megajoule (LMJ), la source SOLEIL, et un projet d'ampleur plus modeste mais remarquable dans son domaine : la source LASERIX d'Orsay/Palaiseau. On pourra citer aussi le projet Arc en Ciel qui, lui, est encore au stade de sa définition. - SOLEIL, source de nouvelle génération de rayonnement synchrotron (plateau de Saclay) est dans une phase active de réalisation : achèvement de l'infrastructure en 2005 et injection du 1o faisceau dans l'anneau de stockage prévu également en 2005. Cette source devrait être la meilleure au monde dans le domaine VUV/X mous, tout en restant très polyvalente (brillance, accordabilité, structure temporelle, polarisation) et complémentaire de l'ESRF. Au final on disposera de 21 lignes de lumi

  2. ESO PR Highlights in 2006

    Science.gov (United States)

    2007-01-01

    Last year proved to be another exceptional year for the European organisation for ground-based astronomy. ESO should begin the New Year with two new member states: Spain (PR 05/06) and the Czech Republic (PR 52/06). ESO PR Highlights 2006 2006 was a year of renovation and revolution in the world of planets. A new Earth-like exoplanet has been discovered (PR 03/06) using a network of telescopes from all over the world (including the Danish 1.54-m one at ESO La Silla). It is not the only child of this fruitful year: thanks to the combined use of ESO's Very Large Telescope (VLT) and La Silla instruments, a surprising system of twin giant exoplanets was found (PR 29/06), and a trio of Neptune-like planets hosted by a nearby star were identified (PR 18/06). These results open new perspectives on the search for habitable zones and on the understanding of the mechanism of planet formation. The VISIR instrument on the VLT has been providing unique information to answer this last question, by supplying a high resolution view of a planet-forming disc (PR 36/06). There are not only new members in the planets' register: during the General Assembly of the International Astronomical Union held in Prague (Czech Republic), it was decided that Pluto is not a planet anymore but a 'dwarf planet'. Whatever its status, Pluto still has a satellite, Charon, whose radius and density have been measured more accurately by observing a rare occultation from different sites, including Cerro Paranal (PR 02/06). The scientific community dedicated 2006 to the great physicist James Clerk Maxwell (it was the 175th anniversary of the birth): without his electromagnetic theory of light, none of the astonishing discoveries of modern physics could have been achieved. Nowadays we can look at distant galaxies in great detail: the GIRAFFE spectrograph on the VLT revealed that galaxies 6 billion years ago had the same amount of dark matter relative to stars than nowadays (PR 10/06), while SINFONI gave an

  3. 77 FR 42467 - Special Local Regulations; Fajardo Offshore Festival II, Fajardo, PR

    Science.gov (United States)

    2012-07-19

    ... 1625-AA08 Special Local Regulations; Fajardo Offshore Festival II, Fajardo, PR AGENCY: Coast Guard, DHS... Festival II, a series of high-speed boat races. The event is scheduled to take place on Sunday, September... the Fajardo Offshore Festival II. C. Discussion of Proposed Rule On September 16, 2012, Puerto Rico...

  4. Préface

    Science.gov (United States)

    Hamieh, Tayssir

    2005-05-01

    Né simultanément à Mulhouse et à Beyrouth en 1996 dans le cadre d'une collaboraiion franco-libanaise sur une initiative personnelle de Monsieur Tayssir HAMIEH. le Colloque Franco-Libanais sur la Science des Matériaux (CSM), qui s'inscrit dans le cadre des relations étroites entre la France et le Liban, est très vite devenu une occasion très importante de rencontre entre scientifiques de haut niveau, non seulement, du contour méditerranéen mais également des pays européens, américains et arabes. La quatrieme édition CSM4 est une véritable réussite grâce à la participation des chercheurs confirmés dans tous les domaines des sciences de matériaux et venant de plusieurs pays tels que la France, I'Algérie, Le Liban, la Syrie, le Maroc, la Tunisie, l'Italie, l'Espagne, le Portugal, le Royaume Uni, les États-Unis, la Russie, l'Allemagne, le Japon et I'Inde ; pour présenter plus de 350 communications orales et par affiche et couvrant presque toutes les disciplines des systèmes des matériaux. Le choix des diffèrents thèmes du colloque sur la science des matériaux a été dicté par l'importance capitale de cette discipline dans notre civilisation moderne. En fait, les matériaux utilisés pour la fabrication artisanale ou industrielle d'objets, de produits et de systèmes ainsi que pour la réalisation de constructions et d'équipements ont de tout temps défini le niveau de notre civilisation technique. La réalisation des objectifs communs de notre monde en plein développement, pour ne pas dire en pleine mutation, est en grande partie tributaire de la mise au point de nouveaux matériaux et de procédés de transformation et d'assemblages nouveaux, présentant des performances et des qualités améliorées. Le colloque a illustré et traduit, de manière remarquables, l'excellente collaboration entre chercheurs libanais et français. Le partenariat est exemplaire par la qualité des laboratoires impliqués et par le niveau scientifique des r

  5. Immunization Schedules for Infants and Children

    Science.gov (United States)

    ... ACIP Vaccination Recommendations Why Immunize? Vaccines: The Basics Immunization Schedule for Infants and Children (Birth through 6 ... any questions please talk to your doctor. 2018 Immunization Schedule Recommended Vaccinations for Infants and Children Schedule ...

  6. Operating Theatre Planning and Scheduling.

    NARCIS (Netherlands)

    Hans, Elias W.; Vanberkel, P.T.; Hall, R.

    2012-01-01

    In this chapter we present a number of approaches to operating theatre planning and scheduling. We organize these approaches hierarchically which serves to illustrate the breadth of problems confronted by researchers. At each hierarchicalplanning level we describe common problems, solution

  7. Schedule Sales Query Raw Data

    Data.gov (United States)

    General Services Administration — Schedule Sales Query presents sales volume figures as reported to GSA by contractors. The reports are generated as quarterly reports for the current year and the...

  8. Multiagent scheduling models and algorithms

    CERN Document Server

    Agnetis, Alessandro; Gawiejnowicz, Stanisław; Pacciarelli, Dario; Soukhal, Ameur

    2014-01-01

    This book presents multi-agent scheduling models in which subsets of jobs sharing the same resources are evaluated by different criteria. It discusses complexity results, approximation schemes, heuristics and exact algorithms.

  9. Executive Schedule C System (ESCS)

    Data.gov (United States)

    Office of Personnel Management — Used to store information on Federal employees in the Senior Executive Service (SES) and appointed employees in the Schedule C System. Every four years, just after...

  10. Parental work schedules and child overweight and obesity.

    Science.gov (United States)

    Champion, S L; Rumbold, A R; Steele, E J; Giles, L C; Davies, M J; Moore, V M

    2012-04-01

    Studies in school-age children have consistently shown a positive association between maternal paid work hours and child obesity. However, there is conflicting evidence about the impact of maternal work hours scheduled at nonstandard times (for example, evenings, nights or weekends), and no previous examination of paternal work schedules and child weight. We examined the associations between maternal, paternal and combined parental paid work schedules and overweight/obesity in children at age 9 years. Data were analysed from the most recent follow-up of 9-year-old children (n=434) in an Australian birth cohort study. Children were measured and classified as overweight/obese using the International Obesity Taskforce body mass index cutoff points. Current working conditions of parents were obtained from a structured interview with the primary caregiver. Logistic regression analyses were used to investigate the effect of parental work schedules on child overweight/obesity with adjustment for a range of sociodemographic and household factors associated with parental employment and child weight. At 9 years of age, 99 children (22.8%) were overweight or obese. When parental work schedules were examined separately, child overweight/obesity was significantly associated with paternal nonstandard work schedules (adjusted odds ratio (OR) 1.97, 95% confidence interval (CI) 1.08-3.61). There was no association with any type of maternal work schedule. We also found an association between child overweight/obesity and circumstances in which both parents worked nonstandard schedules; however, this was of borderline statistical significance in the adjusted models (adjusted OR 2.26, 95% CI 0.99-5.16). Work hours scheduled at nonstandard times, when worked by the father or both parents, were associated with child overweight and obesity. These findings indicate the potential importance of fathers' paid work arrangements for child overweight/obesity, which until recently has largely

  11. Political PR is dying. Long live business PR! / Ilyn Oleg

    Index Scriptorium Estoniae

    Oleg, Ilyn

    2005-01-01

    Vene suurima suhtekorraldusagentuuri Imageland Public Relations rahvusvaheliste suhete juhi hinnangul on Venemaal peamisteks probleemideks PR professionaalide vähesus, nende kehv haritus oma erialal, samuti vähene teadlikkus suhtekorralduse tähtsusest äris

  12. Future aircraft networks and schedules

    Science.gov (United States)

    Shu, Yan

    2011-07-01

    Because of the importance of air transportation scheduling, the emergence of small aircraft and the vision of future fuel-efficient aircraft, this thesis has focused on the study of aircraft scheduling and network design involving multiple types of aircraft and flight services. It develops models and solution algorithms for the schedule design problem and analyzes the computational results. First, based on the current development of small aircraft and on-demand flight services, this thesis expands a business model for integrating on-demand flight services with the traditional scheduled flight services. This thesis proposes a three-step approach to the design of aircraft schedules and networks from scratch under the model. In the first step, both a frequency assignment model for scheduled flights that incorporates a passenger path choice model and a frequency assignment model for on-demand flights that incorporates a passenger mode choice model are created. In the second step, a rough fleet assignment model that determines a set of flight legs, each of which is assigned an aircraft type and a rough departure time is constructed. In the third step, a timetable model that determines an exact departure time for each flight leg is developed. Based on the models proposed in the three steps, this thesis creates schedule design instances that involve almost all the major airports and markets in the United States. The instances of the frequency assignment model created in this thesis are large-scale non-convex mixed-integer programming problems, and this dissertation develops an overall network structure and proposes iterative algorithms for solving these instances. The instances of both the rough fleet assignment model and the timetable model created in this thesis are large-scale mixed-integer programming problems, and this dissertation develops subproblem schemes for solving these instances. Based on these solution algorithms, this dissertation also presents

  13. Construction schedules slack time minimizing

    Science.gov (United States)

    Krzemiński, Michał

    2017-07-01

    The article presents two copyright models for minimizing downtime working brigades. Models have been developed for construction schedules performed using the method of work uniform. Application of flow shop models is possible and useful for the implementation of large objects, which can be divided into plots. The article also presents a condition describing gives which model should be used, as well as a brief example of optimization schedule. The optimization results confirm the legitimacy of the work on the newly-developed models.

  14. Erfolgsfaktoren unternehmerischer Krisen-PR

    OpenAIRE

    Scharr, Florian

    2006-01-01

    Ob "Peanuts", "Elchtest" oder "Hoechst-Störfall" - bei diesen bekannten Öffentlichkeitskrisen der letzten Jahre rief die mangelhafte Krisen-PR der betroffenen Unternehmen bei Medien und Bevölkerung mehr Empörung hervor als die originären Auslöser und potenzierte so den entstandenen Vertrauensverlust. Auch die sich gerade erst entwickelnde PR-Forschung bietet noch keine konkrete Hilfestellung zur Gestaltung von Krisen-PR. Mit dem bedeutenden Diskurs- und dadurch Realitätsgestaltungsmittel Pres...

  15. Online scheduling policies for multiclass call centers with impatient customers

    NARCIS (Netherlands)

    Jouini, O.; Pot, S.A.; Koole, G.M.; Dallery, Y.

    2010-01-01

    We consider a call center with two classes of impatient customers: premium and regular classes. Modeling our call center as a multiclass GI / GI / s + M queue, we focus on developing scheduling policies that satisfy a target ratio constraint on the abandonment probabilities of premium customers to

  16. A Novel Message Scheduling Framework for Delay Tolerant Networks Routing

    KAUST Repository

    Elwhishi, Ahmed; Ho, Pin-Han; Naik, K.; Shihada, Basem

    2013-01-01

    new message scheduling framework for epidemic and two-hop forwarding routing in DTNs, such that the forwarding/dropping decision can be made at a node during each contact for either optimal message delivery ratio or message delivery delay. Extensive

  17. Human Schedule Performance, Protocol Analysis, and the "Silent Dog" Methodology

    Science.gov (United States)

    Cabello, Francisco; Luciano, Carmen; Gomez, Inmaculada; Barnes-Holmes, Dermot

    2004-01-01

    The purpose of the current experiment was to investigate the role of private verbal behavior on the operant performances of human adults, using a protocol analysis procedure with additional methodological controls (the "silent dog" method). Twelve subjects were exposed to fixed ratio 8 and differential reinforcement of low rate 3-s schedules. For…

  18. Présentation

    Directory of Open Access Journals (Sweden)

    Gregor Perko

    2011-12-01

    Full Text Available Au cours des dernières décennies où l’on assiste à une refondation de la morphologie, la discipline s’intéresse de plus en plus à des phénomènes « périphériques », « marginaux », « irréguliers » ou « extragrammaticaux », à des phénomènes n’appartenant pas aux « régions nodales » de la morphologie. Le présent numéro de Linguistica, premier numéro thématique de notre revue, réunit des études qui s’intéres- sent aux frontières internes et externes de la morphologie. La diversité et la richesse des thèmes abordés et des approches proposées témoignent d’un intérêt croissant que les linguistes, non pas uniquement les morphologues, portent à cette thématique. Les articles proposés s’articulent autour de cinq axes majeurs. Un premier axe rassemble les articles qui étudient les frontières entre différentes composantes de la morphologie. L’étude de Michel Roché examine les contraintes lexicales et morphophonologiques sur le paradigme des dérivés en –aie. Les résultats de son analyse remettent en question la notion de « règle de construction des lexèmes ». Irena Stramljič Breznik et Ines Voršič se penchent sur les néologismes de sport en slovène et essaient d’évaluer la productivité ou la créativité des procédés morphologiques en jeu. Dans une étude d’inspiration cognitiviste, Alexandra Bagasheva aborde l’hétérogénéité des verbes composés en anglais. En s’appuyant sur les données fournies par les para- digmes verbaux du maltais, Maris Camilleri examine la complexité du phénomène de classes flexionnelles basées sur les radicaux. Trois travaux concernent des procédés typiquement « extragrammaticaux » servant à former le plus souvent des occasionnalismes: Arnaud Léturgie tente de dégager des propriétés prototypiques de l’amalgamation lexicale en français, notamment celles de la création des mots-valises; Silvia Cacchiani analyse, à l

  19. Phase diagram of Pr-P system

    International Nuclear Information System (INIS)

    Mironov, K.E.

    1981-01-01

    An area of the Pr-P system, adjoining to the Pr ordinate, is plotted up by the DTA method. Presence of P solid solution in Pr is established. Data on thermal stability of PrP, PrP 2 , PrP 5 and PrP 7 are generalized. The diagram of phase transformations in Pr-P system is plotted up proceeding from the whole complex of the data, presented. A supposition is made on a possible formation of solid solutions between the highest polyphosphide and phosphorus [ru

  20. On the PR-algebras

    International Nuclear Information System (INIS)

    Lebedenko, V.M.

    1978-01-01

    The PR-algebras, i.e. the Lie algebras with commutation relations of [Hsub(i),Hsub(j)]=rsub(ij)Hsub(i)(i< j) type are investigated. On the basis of former results a criterion for the membership of 2-solvable Lie algebras to the PR-algebra class is given. The conditions imposed by the criterion are formulated in the linear algebra language

  1. Prácticas curriculares

    OpenAIRE

    García-Gordillo, Mar; Checa Godoy, Antonio; Gómez Mompart, Josep Lluis (Coordinador); Herrero Subías, Mónica (Coordinador)

    2015-01-01

    Esta ponencia pretende analizar, sucintamente, la situacion presente de las prácticas externas en las facultades de Comunicacion españolas. En una coyuntura sumamente peculiar, no solo para las prácticas de los titulos de Comunicacion, sino para todas las practicas universitarias, por los numerosos y a veces contradictorios cambios acaecidos en la legislacion reciente y los vaivenes normativos de las universidades; por la profunda crisis que viene atravesando el sector de la...

  2. Internet innovation in PR management

    Directory of Open Access Journals (Sweden)

    Ćalasan Veljko B.

    2014-01-01

    Full Text Available PR Management in the last decade has evolved to unimaginable limits . Its rapid 'evolution ' is directly linked to the development and innovation, above all, of internet communications - Cyber 'world'. Although the genesis of PR management was announced in a way, the changes of the modern PR management have led to a change in the general attitude towards this particular activity. It has become an indispensable factor for the success of every business or social enterprise. In the general run for internet contents with better quality, as an indispensable tool of PR management , for better use of cyberspace , a new generation of PR manager is created, who has almost no resemblance to the earlier managers before two decades. For these reasons, we believe that Internet innovation through the implementation of PR management, changed the world economy and society. Adjusting speed to this, virtual , yet very real world , is proportional to the speed of development of an economic system as a whole, or any company at the micro level , and society in general .Internet is not an important innovation itself to be sufficient to meet the form and define the essence of economic relations. Only its proper exploitation with the constant use of tested and more intense innovation is the only way to the overall success . The absence of the above, in our opinion, is a sure path to failure.

  3. Improved Scheduling Mechanisms for Synchronous Information and Energy Transmission.

    Science.gov (United States)

    Qin, Danyang; Yang, Songxiang; Zhang, Yan; Ma, Jingya; Ding, Qun

    2017-06-09

    Wireless energy collecting technology can effectively reduce the network time overhead and prolong the wireless sensor network (WSN) lifetime. However, the traditional energy collecting technology cannot achieve the balance between ergodic channel capacity and average collected energy. In order to solve the problem of the network transmission efficiency and the limited energy of wireless devices, three improved scheduling mechanisms are proposed: improved signal noise ratio (SNR) scheduling mechanism (IS2M), improved N-SNR scheduling mechanism (INS2M) and an improved Equal Throughput scheduling mechanism (IETSM) for different channel conditions to improve the whole network performance. Meanwhile, the average collected energy of single users and the ergodic channel capacity of three scheduling mechanisms can be obtained through the order statistical theory in Rayleig, Ricean, Nakagami- m and Weibull fading channels. It is concluded that the proposed scheduling mechanisms can achieve better balance between energy collection and data transmission, so as to provide a new solution to realize synchronous information and energy transmission for WSNs.

  4. Influences of Pr and Ta doping concentration on the characteristic features of FTO thin film deposited by spray pyrolysis

    International Nuclear Information System (INIS)

    Turgut, Güven; Koçyiğit, Adem; Sönmez, Erdal

    2015-01-01

    The Pr and Ta separately doped FTO (10 at.% F incorporated SnO 2 ) films are fabricated via spray pyrolysis. The microstructural, topographic, optical, and electrical features of fluorine-doped TO (FTO) films are investigated as functions of Pr and Ta dopant concentrations. The x-ray diffraction (XRD) measurements reveal that all deposited films show polycrystalline tin oxide crystal property. FTO film has (200) preferential orientation, but this orientation changes to (211) direction with Pr and Ta doping ratio increasing. Atomic force microscopy (AFM) and scanning electron microscopy (SEM) analyses show that all films have uniform and homogenous nanoparticle distributions. Furthermore, morphologies of the films depend on the ratio between Pr and Ta dopants. From ultraviolet-visible (UV-Vis) spectrophotometer measurements, it is shown that the transmittance value of FTO film decreases with Pr and Ta doping elements increasing. The band gap value of FTO film increases only at 1 at.% Ta doping level, it drops off with Pr and Ta doping ratio increasing at other doped FTO films. The electrical measurements indicate that the sheet resistance value of FTO film initially decreases with Pr and Ta doping ratio decreasing and then it increases with Pr and Ta doping ratio increasing. The highest value of figure of merit is obtained for 1 at.% Ta- and Pr-doped FTO film. These results suggest that Pr- and Ta-doped FTO films may be appealing candidates for TCO applications. (paper)

  5. NRC comprehensive records disposition schedule

    International Nuclear Information System (INIS)

    1983-05-01

    Effective January 1, 1982, NRC will institute records retention and disposal practives in accordance with the approved Comprehensive Records Disposition Schedule (CRDS). CRDS is comprised of NRC Schedules (NRCS) 1 to 4 which apply to the agency's program or substantive records and General Records Schedules (GRS) 1 to 24 which apply to housekeeping or facilitative records. NRCS-I applies to records common to all or most NRC offices; NRCS-II applies to program records as found in the various offices of the Commission, Atomic Safety and Licensing Board Panel, and the Atomic Safety and Licensing Appeal Panel; NRCS-III applies to records accumulated by the Advisory Committee on Reactor Safeguards; and NRCS-IV applies to records accumulated in the various NRC offices under the Executive Director for Operations. The schedules are assembled functionally/organizationally to facilitate their use. Preceding the records descriptions and disposition instructions for both NRCS and GRS, there are brief statements on the organizational units which accumulate the records in each functional area, and other information regarding the schedules' applicability

  6. Multiuser switched diversity scheduling schemes

    KAUST Repository

    Shaqfeh, Mohammad; Alnuweiri, Hussein M.; Alouini, Mohamed-Slim

    2012-01-01

    Multiuser switched-diversity scheduling schemes were recently proposed in order to overcome the heavy feedback requirements of conventional opportunistic scheduling schemes by applying a threshold-based, distributed, and ordered scheduling mechanism. The main idea behind these schemes is that slight reduction in the prospected multiuser diversity gains is an acceptable trade-off for great savings in terms of required channel-state-information feedback messages. In this work, we characterize the achievable rate region of multiuser switched diversity systems and compare it with the rate region of full feedback multiuser diversity systems. We propose also a novel proportional fair multiuser switched-based scheduling scheme and we demonstrate that it can be optimized using a practical and distributed method to obtain the feedback thresholds. We finally demonstrate by numerical examples that switched-diversity scheduling schemes operate within 0.3 bits/sec/Hz from the ultimate network capacity of full feedback systems in Rayleigh fading conditions. © 2012 IEEE.

  7. Sport Tournament Automated Scheduling System

    Directory of Open Access Journals (Sweden)

    Raof R. A. A

    2018-01-01

    Full Text Available The organizer of sport events often facing problems such as wrong calculations of marks and scores, as well as difficult to create a good and reliable schedule. Most of the time, the issues about the level of integrity of committee members and also issues about errors made by human came into the picture. Therefore, the development of sport tournament automated scheduling system is proposed. The system will be able to automatically generate the tournament schedule as well as automatically calculating the scores of each tournament. The problem of scheduling the matches of a round robin and knock-out phase in a sport league are given focus. The problem is defined formally and the computational complexity is being noted. A solution algorithm is presented using a two-step approach. The first step is the creation of a tournament pattern and is based on known graph-theoretic method. The second one is an assignment problem and it is solved using a constraint based depth-first branch and bound procedure that assigns actual teams to numbers in the pattern. As a result, the scheduling process and knock down phase become easy for the tournament organizer and at the same time increasing the level of reliability.

  8. Multiuser switched diversity scheduling schemes

    KAUST Repository

    Shaqfeh, Mohammad

    2012-09-01

    Multiuser switched-diversity scheduling schemes were recently proposed in order to overcome the heavy feedback requirements of conventional opportunistic scheduling schemes by applying a threshold-based, distributed, and ordered scheduling mechanism. The main idea behind these schemes is that slight reduction in the prospected multiuser diversity gains is an acceptable trade-off for great savings in terms of required channel-state-information feedback messages. In this work, we characterize the achievable rate region of multiuser switched diversity systems and compare it with the rate region of full feedback multiuser diversity systems. We propose also a novel proportional fair multiuser switched-based scheduling scheme and we demonstrate that it can be optimized using a practical and distributed method to obtain the feedback thresholds. We finally demonstrate by numerical examples that switched-diversity scheduling schemes operate within 0.3 bits/sec/Hz from the ultimate network capacity of full feedback systems in Rayleigh fading conditions. © 2012 IEEE.

  9. Environmental surveillance master sampling schedule

    International Nuclear Information System (INIS)

    Bisping, L.E.

    1991-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE). This document contains the planned schedule for routine sample collection for the Surface Environmental Surveillance Project (SESP) and Ground-Water Monitoring Project. The routine sampling plan for the SESP has been revised this year to reflect changing site operations and priorities. Some sampling previously performed at least annually has been reduced in frequency, and some new sampling to be performed at a less than annual frequency has been added. Therefore, the SESP schedule reflects sampling to be conducted in calendar year 1991 as well as future years. The ground-water sampling schedule is for 1991. This schedule is subject to modification during the year in response to changes in Site operation, program requirements, and the nature of the observed results. Operational limitations such as weather, mechanical failures, sample availability, etc., may also require schedule modifications. Changes will be documented in the respective project files, but this plan will not be reissued. The purpose of these monitoring projects is to evaluate levels of radioactive and nonradioactive pollutants in the Hanford evirons

  10. Environmental surveillance master sampling schedule

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, L.E.

    1991-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE). This document contains the planned schedule for routine sample collection for the Surface Environmental Surveillance Project (SESP) and Ground-Water Monitoring Project. The routine sampling plan for the SESP has been revised this year to reflect changing site operations and priorities. Some sampling previously performed at least annually has been reduced in frequency, and some new sampling to be performed at a less than annual frequency has been added. Therefore, the SESP schedule reflects sampling to be conducted in calendar year 1991 as well as future years. The ground-water sampling schedule is for 1991. This schedule is subject to modification during the year in response to changes in Site operation, program requirements, and the nature of the observed results. Operational limitations such as weather, mechanical failures, sample availability, etc., may also require schedule modifications. Changes will be documented in the respective project files, but this plan will not be reissued. The purpose of these monitoring projects is to evaluate levels of radioactive and nonradioactive pollutants in the Hanford evirons.

  11. PR Crisis Melalui Media Sosial

    Directory of Open Access Journals (Sweden)

    Gladys Carlina

    2017-07-01

    Full Text Available The background of this research is communication, new media, PR and PR Crisis. Fourth of this background has a close relationship, starting from communication, human in everyday life would require communication to receive and convey information, human can not be released from human life. The advancement of the times and the development of technology, causing people to communicate easily and the development of this era caused a new challenge for the PR and PR Crisis of a company, they should be able to maintain a positive image of the company in the minds of people. In this study using descriptive qualitative methodology, it contains many writings and drawings compared to the numbers. The purpose of this research is to know the strategy used by Pizza Hut in dealing with the issue of expired food. Penelitin results, social media is very positive impact on Pizza Hut in the recovery of food issues expired. The strategy used by the Pizza Hut Crisis PR is to utilize social media. Visible from the issue of expired food that disappeared in public and Pizza Hut restaurant until now crowded visited. Latar belakang dari penelitian ini yaitu komunikasi, media baru, PR dan PR Krisis. Keempat dari latar belakang ini mempunyai hubungan yang erat, dimulai dari komunikasi, manusia di dalam kehidupan sehari-hari tentunya memerlukan komunikasi untuk menerima dan menyampaikan informasi, manusia tidak bisa dilepaskan dari kehidupan manusia. Majunya perkembangan zaman dan perkembangan teknologi, menyebabkan manusia melakukan komunikasi dengan mudah dan perkembangan zaman ini menyebabkan adanya tantangan baru bagi para PR dan PR Krisis sebuah perusahaan, mereka harus bisa mempertahankan citra positif perusahaan di benak masyarakat. Dalam penelitian ini menggunakan metodologi kualitatif deksriptif, memuat banyak tulisan dan gambar dibandingkan angka-angka. Tujuan dari penelitian ini untuk mengetahui strategi yang digunakan oleh Pizza Hut dalam menangani isu makanan

  12. Schedulability Analysis for Java Finalizers

    DEFF Research Database (Denmark)

    Bøgholm, Thomas; Hansen, Rene Rydhof; Søndergaard, Hans

    2010-01-01

    Java finalizers perform clean-up and finalisation of objects at garbage collection time. In real-time Java profiles the use of finalizers is either discouraged (RTSJ, Ravenscar Java) or even disallowed (JSR-302), mainly because of the unpredictability of finalizers and in particular their impact...... on the schedulability analysis. In this paper we show that a controlled scoped memory model results in a structured and predictable execution of finalizers, more reminiscent of C++ destructors than Java finalizers. Furthermore, we incorporate finalizers into a (conservative) schedulability analysis for Predictable Java...... programs. Finally, we extend the SARTS tool for automated schedulability analysis of Java bytecode programs to handle finalizers in a fully automated way....

  13. Environmental surveillance master sampling schedule

    International Nuclear Information System (INIS)

    Bisping, L.E.

    1997-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest National Laboratory (PNNL)(a) for the US Department of Energy (DOE). This document contains the planned 1997 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP) and Drinking Water Monitoring Project. In addition, Section 3.0, Biota, also reflects a rotating collection schedule identifying the year a specific sample is scheduled for collection. The purpose of these monitoring projects is to evaluate levels of radioactive and nonradioactive pollutants in the Hanford environs, as required in DOE Order 5400.1, General Environmental Protection Program, and DOE Order 5400.5, Radiation Protection of the Public and the Environment. The sampling methods will be the same as those described in the Environmental Monitoring Plan, US Department of Energy, Richland Operations Office, DOE/RL91-50, Rev. 1, US Department of Energy, Richland, Washington

  14. Endogenous scheduling preferences and congestion

    DEFF Research Database (Denmark)

    Fosgerau, Mogens; Small, Kenneth

    2010-01-01

    and leisure, but agglomeration economies at home and at work lead to scheduling preferences forming endogenously. Using bottleneck congestion technology, we obtain an equilibrium queuing pattern consistent with a general version of the Vickrey bottleneck model. However, the policy implications are different....... Compared to the predictions of an analyst observing untolled equilibrium and taking scheduling preferences as exogenous, we find that both the optimal capacity and the marginal external cost of congestion have changed. The benefits of tolling are greater, and the optimal time varying toll is different....

  15. Artificial intelligence approaches to astronomical observation scheduling

    Science.gov (United States)

    Johnston, Mark D.; Miller, Glenn

    1988-01-01

    Automated scheduling will play an increasing role in future ground- and space-based observatory operations. Due to the complexity of the problem, artificial intelligence technology currently offers the greatest potential for the development of scheduling tools with sufficient power and flexibility to handle realistic scheduling situations. Summarized here are the main features of the observatory scheduling problem, how artificial intelligence (AI) techniques can be applied, and recent progress in AI scheduling for Hubble Space Telescope.

  16. Ten years experience of PR

    International Nuclear Information System (INIS)

    Dobak, Dobroslav

    2002-01-01

    This paper is an effort to summarize the way Slovak Bohunice NPP has gone through since the historical change in the Middle and Eastern European countries. Milestones on the way were: 1989 - change of political system; increasing interest of the public appearance; creation of work capacities - personnel and technical; education/exchange with Western countries; 1994 - establishment of Foreign Affairs and PR Department reporting directly to the NPP manager; application of various approaches, some observed from other countries; creation of utility policy - place of PR in the company; establishment of QA system - description of PR activities, goals, interlinks etc.; annual planning process including activities, finance, education (training). Lessons learned are: the NPP managers were not prepared; the public was not (and still is not) prepared to obtain specific information; education is crucial in opinion winning; simple overtake of methods from others is not always applicable; strategy and feedback are necessary. Special case was the early closure Bohunice V1 NPP

  17. Lifetime Improvement by Battery Scheduling

    NARCIS (Netherlands)

    Jongerden, M.R.; Schmitt, Jens B.; Haverkort, Boudewijn R.H.M.

    The use of mobile devices is often limited by the lifetime of their batteries. For devices that have multiple batteries or that have the option to connect an extra battery, battery scheduling, thereby exploiting the recovery properties of the batteries, can help to extend the system lifetime. Due to

  18. Lifetime improvement by battery scheduling

    NARCIS (Netherlands)

    Jongerden, M.R.; Haverkort, Boudewijn R.H.M.

    The use of mobile devices is often limited by the lifetime of its battery. For devices that have multiple batteries or that have the option to connect an extra battery, battery scheduling, thereby exploiting the recovery properties of the batteries, can help to extend the system lifetime. Due to the

  19. How useful are preemptive schedules?

    NARCIS (Netherlands)

    Brucker, P.; Heitmann, S.; Hurink, J.L.

    2001-01-01

    Machine scheduling admits two options to process jobs. In a preemptive mode processing may be interrupted and resumed later even on a different machine. In a nonpreemptive mode interruptions are not allowed. Usually, the possibility to preempt jobs leads to better performance values. However, also

  20. Interaction in activity location scheduling

    NARCIS (Netherlands)

    Tabak, V.; Vries, de B.; Dijkstra, J.; Jessurun, A.J.

    2006-01-01

    In this paper we discuss the interaction in activity location scheduling which is the main subject of an ongoing research project called "User Simulation of Space Utilization". The aim of this research project is to develop an overall model for the simulation of human movement and utilization of

  1. Scheduling with target start times

    NARCIS (Netherlands)

    Hoogeveen, J.A.; Velde, van de S.L.; Klein Haneveld, W.K.; Vrieze, O.J.; Kallenberg, L.C.M.

    1997-01-01

    We address the single-machine problem of scheduling n independent jobs subject to target start times. Target start times are essentially release times that may be violated at a certain cost. The goal is to minimize an objective function that is composed of total completion time and maximum

  2. Stochastic scheduling on unrelated machines

    NARCIS (Netherlands)

    Skutella, Martin; Sviridenko, Maxim; Uetz, Marc Jochen

    2013-01-01

    Two important characteristics encountered in many real-world scheduling problems are heterogeneous machines/processors and a certain degree of uncertainty about the actual sizes of jobs. The first characteristic entails machine dependent processing times of jobs and is captured by the classical

  3. Flexible Schedules and Shift Work.

    Science.gov (United States)

    Beers, Thomas M.

    2000-01-01

    Flexible work hours have gained prominence, as more than 25 million workers (27.6% of all full-time workers) can now vary their schedules. However, there has been little change since the mid-1980s in the proportion who work a shift other than a regular daytime shift. (JOW)

  4. Scheduling periodic tasks with slack

    NARCIS (Netherlands)

    Korst, J.H.M.; Aarts, E.H.L.; Lenstra, J.K.

    1997-01-01

    We consider the problem of nonpreemptively scheduling periodic tasks on a minimum number of identical processors, assuming that some slack is allowed in the time between successive executions of a periodic task. We prove that the problem is NP-hard in the strong sense. Necessary and sufficient

  5. Toward Realistic Acquisition Schedule Estimates

    Science.gov (United States)

    2016-04-30

    replace earlier versions of the F/A-18. Joint and International Nature At the time of JSF conception, there was a clear preference at the highest levels...ALPHABET SOUP ” (Aboulafia, 2015) OF STUDIES AND CONCEPTS • … MERGED INTO JAST • … WHICH EVOLVED TO JSF • WELL-KNOWN COST AND SCHEDULE

  6. Analyzing NPS Scheduling Using OSIRIS

    Science.gov (United States)

    1993-03-01

    School TEACHER SCHEDULE BLOCKS REPORT Date: 2/19/93 Period Name ID Term Days 1234 Adragna , Joe 170401 1 F xx Agrawal, Brij 120101 1 F xx Almquist...LOAD REPORT Date: 3/18/93 Total Max Consec Total Teacher ID Term Classes Classes Stud Adragna , Joe 170401 1 1 1 3 Agrawal, Brij 120101 1 2 2 98 Aiello

  7. Intercell scheduling: A negotiation approach using multi-agent coalitions

    Science.gov (United States)

    Tian, Yunna; Li, Dongni; Zheng, Dan; Jia, Yunde

    2016-10-01

    Intercell scheduling problems arise as a result of intercell transfers in cellular manufacturing systems. Flexible intercell routes are considered in this article, and a coalition-based scheduling (CBS) approach using distributed multi-agent negotiation is developed. Taking advantage of the extended vision of the coalition agents, the global optimization is improved and the communication cost is reduced. The objective of the addressed problem is to minimize mean tardiness. Computational results show that, compared with the widely used combinatorial rules, CBS provides better performance not only in minimizing the objective, i.e. mean tardiness, but also in minimizing auxiliary measures such as maximum completion time, mean flow time and the ratio of tardy parts. Moreover, CBS is better than the existing intercell scheduling approach for the same problem with respect to the solution quality and computational costs.

  8. Multiuser switched diversity scheduling systems with per-user threshold

    KAUST Repository

    Nam, Haewoon

    2010-05-01

    A multiuser switched diversity scheduling scheme with per-user feedback threshold is proposed and analyzed in this paper. The conventional multiuser switched diversity scheduling scheme uses a single feedback threshold for every user, where the threshold is a function of the average signal-to-noise ratios (SNRs) of the users as well as the number of users involved in the scheduling process. The proposed scheme, however, constructs a sequence of feedback thresholds instead of a single feedback threshold such that each user compares its channel quality with the corresponding feedback threshold in the sequence. Numerical and simulation results show that thanks to the flexibility of threshold selection, where a potentially different threshold can be used for each user, the proposed scheme provides a higher system capacity than that for the conventional scheme. © 2006 IEEE.

  9. Multiple determinants of transfer of evaluative function after conditioning with free-operant schedules of reinforcement.

    Science.gov (United States)

    Dack, Charlotte; Reed, Phil; McHugh, Louise

    2010-11-01

    The aim of the four present experiments was to explore how different schedules of reinforcement influence schedule-induced behavior, their impact on evaluative ratings given to conditioned stimuli associated with each schedule through evaluative conditioning, and the transfer of these evaluations through derived stimulus networks. Experiment 1 compared two contrasting response reinforcement rules (variable ratio [VR], variable interval [VI]). Experiment 2 varied the response to reinforcement rule between two schedules but equated the outcome to response rate (differential reinforcement of high rate [DRH] vs. VR). Experiment 3 compared molar and molecular aspects of contingencies of reinforcement (tandem VIVR vs. tandem VRVI). Finally, Experiment 4 employed schedules that induced low rates of responding to determine whether, under these circumstances, responses were more sensitive to the molecular aspects of a schedule (differential reinforcement of low rate [DRL] vs. VI). The findings suggest that the transfer of evaluative functions is determined mainly by differences in response rate between the schedules and the molar aspects of the schedules. However, when neither schedule was based on a strong response reinforcement rule, the transfer of evaluative judgments came under the control of the molecular aspects of the schedule.

  10. Comparison between TRMM PR and

    Indian Academy of Sciences (India)

    A comparison between TRMM PR rainfall estimates and rain gauge data from ANEEL and com- bined gauge/satellite ..... correctly the of the south Atlantic convergence ..... vapor, snow cover, and sea ice derived from SSM/I mea- surements ...

  11. Credibility Discourse of PR Agencies

    DEFF Research Database (Denmark)

    Isaksson, Maria; Jørgensen, Poul Erik Flyvholm

    2008-01-01

    to giving assurance of their expertise, trustworthiness and empathy, thus confirming our overall expectation that corporate credibility discourse is relatively uniform from a European perspective. However, contrary to our assumptions, the results of our study show that PR credibility discourse demonstrates...

  12. Profesi PR Identik dengan Perempuan ?

    Directory of Open Access Journals (Sweden)

    Neni Yulianita

    2004-09-01

    Full Text Available Profesi Public Relations (PR atau di Indonesia lebih dikenal dengan Humas, seringkali diidentikkan dengan profesi yang pantas dijabat oleh kaum perempuan. Adanya sebagian kalangan masyarakat yang menjudge bahwa profesi ini lebih tepat dijabat oleh kaum perempuan, dengan alasan profesi ini menuntut keterampilan, daya tarik, dan keluwesan. Dengan adanya anggapan tersebut,  tentu saja telah memberikan implikasi pada kaum laki-laki  sehingga menimbulkan keraguan pada mereka untuk menekuni bidang kajian PR/Humas di berbagai Perguruan Tinggi yang memiliki bidang ini. Ironisnya, user masih menganggap kaum laki-lakilah yang lebih tepat menjabat profesi PR, dengan anggapan antara lain bahwa laki-laki lebih energik, aktif, rasional, agresif, memiliki stamina atau fisik yang lebih kuat, dan memiliki kemampuan dalam penguasaan hardware atau teknologi komunikasi mutakhir yang lebih baik dibanding wanita yang dianggap lebih emosional, pasif, dan submisif. Anggapan ini tentu saja sangat merugikan perempuan,  walaupun hasil penelitian Robins dinyatakan bahwa,  “Tidak ada beda  laki-laki dan perempuan yang konsisten dalam kemampuan memecahkan masalah, keterampilan analitis, dorongan kompetitif, motivasi, sosiobilitas, atau kemampuan belajar”.  Untuk itu, dalam tulisan ini, penulis menyajikan jawaban apakah benar Profesi PR lebih tepat dijabat oleh Perempuan?

  13. ESO PR Highlights in 2000

    Science.gov (United States)

    2001-01-01

    At the beginning of the new millennium, ESO and its staff are facing the future with confidence. The four 8.2-m Unit Telescopes of the Very Large Telescope (VLT) are in great shape and the VLT Interferometer (VLTI) will soon have "first fringes". The intercontinental ALMA project is progressing well and concepts for extremely large optical/infrared telescopes are being studied. They can also look back at a fruitful and rewarding past year. Perhaps the most important, single development has been the rapid transition of the Very Large Telescope (VLT). From being a "high-tech project under construction" it has now become a highly proficient, world-class astronomical observatory. This trend is clearly reflected in ESO's Press Releases , as more and more front-line scientific results emerge from rich data obtained at this very efficient facility. There were also exciting news from several of the instruments at La Silla. At the same time, the ESO community may soon grow, as steps towards membership are being taken by various European countries. Throughout 2000, a total of 54 PR communications were made, with a large number of Press Photos and Video Clips, cf. the 2000 PR Index. Some of the ESO PR highlights may be accessed directly via the clickable image on the present page. ESO PR Photo 01/01 is also available in a larger (non-clickable) version [ JPEG: 566 x 566 pix - 112k]. It may be reproduced, if credit is given to the European Southern Observatory.

  14. Development of Watch Schedule Using Rules Approach

    Science.gov (United States)

    Jurkevicius, Darius; Vasilecas, Olegas

    The software for schedule creation and optimization solves a difficult, important and practical problem. The proposed solution is an online employee portal where administrator users can create and manage watch schedules and employee requests. Each employee can login with his/her own account and see his/her assignments, manage requests, etc. Employees set as administrators can perform the employee scheduling online, manage requests, etc. This scheduling software allows users not only to see the initial and optimized watch schedule in a simple and understandable form, but also to create special rules and criteria and input their business. The system using rules automatically will generate watch schedule.

  15. Project management with dynamic scheduling baseline scheduling, risk analysis and project control

    CERN Document Server

    Vanhoucke, Mario

    2013-01-01

    The topic of this book is known as dynamic scheduling, and is used to refer to three dimensions of project management and scheduling: the construction of a baseline schedule and the analysis of a project schedule's risk as preparation of the project control phase during project progress. This dynamic scheduling point of view implicitly assumes that the usability of a project's baseline schedule is rather limited and only acts as a point of reference in the project life cycle.

  16. Cross-Layer Adaptive Feedback Scheduling of Wireless Control Systems

    Science.gov (United States)

    Xia, Feng; Ma, Longhua; Peng, Chen; Sun, Youxian; Dong, Jinxiang

    2008-01-01

    There is a trend towards using wireless technologies in networked control systems. However, the adverse properties of the radio channels make it difficult to design and implement control systems in wireless environments. To attack the uncertainty in available communication resources in wireless control systems closed over WLAN, a cross-layer adaptive feedback scheduling (CLAFS) scheme is developed, which takes advantage of the co-design of control and wireless communications. By exploiting cross-layer design, CLAFS adjusts the sampling periods of control systems at the application layer based on information about deadline miss ratio and transmission rate from the physical layer. Within the framework of feedback scheduling, the control performance is maximized through controlling the deadline miss ratio. Key design parameters of the feedback scheduler are adapted to dynamic changes in the channel condition. An event-driven invocation mechanism for the feedback scheduler is also developed. Simulation results show that the proposed approach is efficient in dealing with channel capacity variations and noise interference, thus providing an enabling technology for control over WLAN. PMID:27879934

  17. Cross-Layer Adaptive Feedback Scheduling of Wireless Control Systems

    Directory of Open Access Journals (Sweden)

    Jinxiang Dong

    2008-07-01

    Full Text Available There is a trend towards using wireless technologies in networked control systems. However, the adverse properties of the radio channels make it difficult to design and implement control systems in wireless environments. To attack the uncertainty in available communication resources in wireless control systems closed over WLAN, a cross-layer adaptive feedback scheduling (CLAFS scheme is developed, which takes advantage of the co-design of control and wireless communications. By exploiting crosslayer design, CLAFS adjusts the sampling periods of control systems at the application layer based on information about deadline miss ratio and transmission rate from the physical layer. Within the framework of feedback scheduling, the control performance is maximized through controlling the deadline miss ratio. Key design parameters of the feedback scheduler are adapted to dynamic changes in the channel condition. An eventdriven invocation mechanism for the feedback scheduler is also developed. Simulation results show that the proposed approach is efficient in dealing with channel capacity variations and noise interference, thus providing an enabling technology for control over WLAN.

  18. The Vessel Schedule Recovery Problem

    DEFF Research Database (Denmark)

    Brouer, Berit Dangaard; Plum, Christian Edinger Munk; Vaaben, Bo

    Maritime transportation is the backbone of world trade and is accountable for around 3% of the worlds CO2 emissions. We present the Vessel Schedule Recovery Problem (VSRP) to evaluate a given disruption scenario and to select a recovery action balancing the trade off between increased bunker cons...... consumption and the impact on the remaining network and the customer service level. The model is applied to 4 real cases from Maersk Line. Solutions are comparable or superior to those chosen by operations managers. Cost savings of up to 58% may be achieved.......Maritime transportation is the backbone of world trade and is accountable for around 3% of the worlds CO2 emissions. We present the Vessel Schedule Recovery Problem (VSRP) to evaluate a given disruption scenario and to select a recovery action balancing the trade off between increased bunker...

  19. CMS Planning and Scheduling System

    CERN Document Server

    Kotamaki, M

    1998-01-01

    The paper describes the procedures and the system to build and maintain the schedules needed to manage time, resources, and progress of the CMS project. The system is based on the decomposition of the project into work packages, which can be each considered as a complete project with its own structure. The system promotes the distribution of the decision making and responsibilities to lower levels in the organisation by providing a state-of-the-art system to formalise the external commitments of the work packages without limiting their ability to modify their internal schedules to best meet their commitments. The system lets the project management focus on the interfaces between the work packages and alerts the management immediately if a conflict arises. The proposed system simplifies the planning and management process and eliminates the need for a large, centralised project management system.

  20. 75 FR 42831 - Proposed Collection; Comment Request for Form 1065, Schedule C, Schedule D, Schedule K-1...

    Science.gov (United States)

    2010-07-22

    .../or continuing information collections, as required by the Paperwork Reduction Act of 1995, Public Law... Income, Credits, Deductions and Other Items), Schedule L (Balance Sheets per Books), Schedule M-1 (Reconciliation of Income (Loss) per Books With Income (Loss) per Return)), Schedule M-2 (Analysis of Partners...

  1. Pr4N2S3 and Pr4N2Se3: two non-isostructural praseodymium(iii) nitride chalcogenides

    International Nuclear Information System (INIS)

    Lissner, Falk; Schleid, Thomas

    2005-01-01

    The non-isostructural nitride chalcogenides of praseodymium, Pr 4 N 2 S 3 and Pr 4 N 2 Se 3 , are formed by the reaction of the praseodymium metal with sodium azide (NaN 3 ), praseodymium trihalide (PrX 3 ; X = Cl, Br, I) and the respective chalcogen (sulfur or selenium) at 900 C in evacuated silica ampoules after seven days. Both crystallize monoclinically in space group C2/c (Pr 4 N 2 S 3 : a = 1788.57(9), b = 986.04(5), c = 1266.49(6) pm, β = 134.546(7) , Z = 8; Pr 4 N 2 Se 3 : a = 1311.76(7), b = 1017.03(5), c = 650.42(3) pm, β = 90.114(6) , Z = 4). The crystal structures of both compounds show a layered construction, dominated by N 3- -centred (Pr 3+ ) 4 tetrahedra which share a common edge first. Continuing linkage of the so resulting bitetrahedral [N 2 Pr 6 ] 12+ units via the non-connected vertices to layers according to [stack ∞ 2 ]{[N(Pr) 2/2 e (Pr') 2/2 v ] 3+ } forms different kinds of tetrahedral nets which can be described as layers consisting of ''four- and eight-rings'' for Pr 4 N 2 S 3 and as layers of ''six-rings'' for Pr 4 N 2 Se 3 . Whereas the crystal structure of Pr 4 N 2 S 3 exhibits four different Pr 3+ cations with coordination numbers of six (2 x) and seven (2 x) against N 3- and S 2- , the number of cations in the nitride selenide (Pr 4 N 2 Se 3 ) is reduced to half (Pr1 and Pr2) also having six- and sevenfold anionic coordination spheres. Further motifs for the connection of [NM 4 ] 9+ tetrahedra in crystal structures of nitride chalcogenides and halides of the rare-earth elements with ratios of N: M = 1: 2 are presented and discussed. (Abstract Copyright [2005], Wiley Periodicals, Inc.) [de

  2. Preemptive scheduling in overloaded systems

    Czech Academy of Sciences Publication Activity Database

    Chrobak, M.; Epstein, L.; Noga, J.; Sgall, Jiří; van Stee, R.; Tichý, Tomáš; Vakhania, N.

    2003-01-01

    Roč. 67, č. 1 (2003), s. 183-197 ISSN 0022-0000 R&D Projects: GA ČR GA201/01/1195; GA MŠk ME 476; GA AV ČR IAA1019901; GA MŠk LN00A056 Institutional research plan: CEZ:AV0Z1019905; CEZ:AV0Z1019905 Keywords : scheduling * online algorithms * benefit Subject RIV: BA - General Mathematics Impact factor: 0.795, year: 2003

  3. WCET Analysis for Preemptive Scheduling

    OpenAIRE

    Altmeyer, Sebastian; Gebhard, Gernot

    2008-01-01

    Hard real-time systems induce strict constraints on the timing of the task set. Validation of these timing constraints is thus a major challenge during the design of such a system. Whereas the derivation of timing guarantees must already be considered complex if tasks are running to completion, it gets even more complex if tasks are scheduled preemptively -- especially due to caches, deployed to improve the average performance. In this paper we propose a new method to compu...

  4. Scheduling Maintenance Jobs in Networks

    OpenAIRE

    Abed, Fidaa; Chen, Lin; Disser, Yann; Groß, Martin; Megow, Nicole; Meißner, Julie; Richter, Alexander T.; Rischke, Roman

    2017-01-01

    We investigate the problem of scheduling the maintenance of edges in a network, motivated by the goal of minimizing outages in transportation or telecommunication networks. We focus on maintaining connectivity between two nodes over time; for the special case of path networks, this is related to the problem of minimizing the busy time of machines. We show that the problem can be solved in polynomial time in arbitrary networks if preemption is allowed. If preemption is restricted to integral t...

  5. Environmental surveillance master sampling schedule

    International Nuclear Information System (INIS)

    Bisping, L.E.

    1995-02-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the U.S. Department of Energy (DOE). This document contains the planned 1994 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP), Drinking Water Project, and Ground-Water Surveillance Project. Samples are routinely collected for the SESP and analyzed to determine the quality of air, surface water, soil, sediment, wildlife, vegetation, foodstuffs, and farm products at Hanford Site and surrounding communities. The responsibility for monitoring onsite drinking water falls outside the scope of the SESP. PNL conducts the drinking water monitoring project concurrent with the SESP to promote efficiency and consistency, utilize expertise developed over the years, and reduce costs associated with management, procedure development, data management, quality control, and reporting. The ground-water sampling schedule identifies ground-water sampling .events used by PNL for environmental surveillance of the Hanford Site. Sampling is indicated as annual, semi-annual, quarterly, or monthly in the sampling schedule. Some samples are collected and analyzed as part of ground-water monitoring and characterization programs at Hanford (e.g. Resources Conservation and Recovery Act (RCRA), Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), or Operational). The number of samples planned by other programs are identified in the sampling schedule by a number in the analysis column and a project designation in the Cosample column. Well sampling events may be merged to avoid redundancy in cases where sampling is planned by both-environmental surveillance and another program

  6. Broadcast scheduling for mobile advertising

    OpenAIRE

    De Reyck, B.; Degraeve, Z.

    2003-01-01

    We describe a broadcast scheduling system developed for a precision marketing firm specialized in location-sensitive permission-based mobile advertising using SMS (Short Message Service) text messaging. Text messages containing advertisements were sent to registered customers when they were shopping in one of two shopping centers in the vicinity of London. The ads typically contained a limited-time promotional offer. The company's problem was deciding which ads to send out to which customers ...

  7. Schedule of the nuclear program

    International Nuclear Information System (INIS)

    Heigl, F.

    1977-01-01

    The lecure tries to explain the main phases which must be passed to establish nuclear power plants, the feasibility phase, preconstruction and construction phase. Each phase consists of a lot of activities which are commented. Further the lecture tries to give some ideas of durances and dependence between the phases or activities to get a complete time schedule of the realization of a nuclear power project. (HP) [de

  8. Environmental surveillance master sampling schedule

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, L.E.

    1995-02-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the U.S. Department of Energy (DOE). This document contains the planned 1994 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP), Drinking Water Project, and Ground-Water Surveillance Project. Samples are routinely collected for the SESP and analyzed to determine the quality of air, surface water, soil, sediment, wildlife, vegetation, foodstuffs, and farm products at Hanford Site and surrounding communities. The responsibility for monitoring onsite drinking water falls outside the scope of the SESP. PNL conducts the drinking water monitoring project concurrent with the SESP to promote efficiency and consistency, utilize expertise developed over the years, and reduce costs associated with management, procedure development, data management, quality control, and reporting. The ground-water sampling schedule identifies ground-water sampling .events used by PNL for environmental surveillance of the Hanford Site. Sampling is indicated as annual, semi-annual, quarterly, or monthly in the sampling schedule. Some samples are collected and analyzed as part of ground-water monitoring and characterization programs at Hanford (e.g. Resources Conservation and Recovery Act (RCRA), Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), or Operational). The number of samples planned by other programs are identified in the sampling schedule by a number in the analysis column and a project designation in the Cosample column. Well sampling events may be merged to avoid redundancy in cases where sampling is planned by both-environmental surveillance and another program.

  9. Environmental surveillance master sampling schedule

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, L.E.

    1993-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE). Samples are routinely collected and analyzed to determine the quality of air, surface water, ground water, soil, sediment, wildlife, vegetation, foodstuffs, and farm products at Hanford Site and surrounding communities. This document contains the planned schedule for routine sample collection for the Surface Environmental Surveillance Project (SESP) and Drinking Water Project, and Ground-Water Surveillance Project.

  10. Guidelines of Decommissioning Schedule Establishment

    Energy Technology Data Exchange (ETDEWEB)

    Oh, Jae Yong; Yun, Taesik; Kim, Younggook; Kim, Hee-Geun [KHNP CRI, Daejeon (Korea, Republic of)

    2016-10-15

    Decommissioning has recently become an issue highlighted in Korea due to the Permanent Shutdown (PS) of Kori-1 plant. Since Korea Hydro and Nuclear Power (KHNP) Company decided the PS of Kori-1 instead of further continued operation, Kori-1 will be the first decommissioning plant of the commercial reactors in Korea. Korean regulatory authority demands Initial Decommissioning Plan (IDP) for all the plants in operation and under construction. In addition, decommissioning should be considered for the completion of the life cycle of NPPs. To date, Korea has no experience regarding decommissioning of the commercial reactor and a lot of uncertainties will be expected due to its site-specific factors. However, optimized decommissioning process schedule must be indispensable in the safety and economic efficiency of the project. Differed from USA, Korea has no experience and know-hows of the operation and site management for decommissioning. Hence, in Korea, establishment of decommissioning schedule has to give more weight to safety than precedent cases. More economical and rational schedule will be composed by collecting and analyzing the experience data and site-specific data and information as the decommissioning progresses. In a long-range outlook, KHNP having capability of NPP decommissioning will try to decommissioning business in Korea and foreign countries.

  11. Shiftwork Scheduling for the 1990s.

    Science.gov (United States)

    Coleman, Richard M.

    1989-01-01

    The author discusses the problems of scheduling shift work, touching on such topics as employee desires, health requirements, and business needs. He presents a method for developing shift schedules that addresses these three areas. Implementation hints are also provided. (CH)

  12. Robust and Flexible Scheduling with Evolutionary Computation

    DEFF Research Database (Denmark)

    Jensen, Mikkel T.

    Over the last ten years, there have been numerous applications of evolutionary algorithms to a variety of scheduling problems. Like most other research on heuristic scheduling, the primary aim of the research has been on deterministic formulations of the problems. This is in contrast to real world...... scheduling problems which are usually not deterministic. Usually at the time the schedule is made some information about the problem and processing environment is available, but this information is uncertain and likely to change during schedule execution. Changes frequently encountered in scheduling...... environments include machine breakdowns, uncertain processing times, workers getting sick, materials being delayed and the appearance of new jobs. These possible environmental changes mean that a schedule which was optimal for the information available at the time of scheduling can end up being highly...

  13. Pittsburgh International Airport - Scheduled Passenger Traffic

    Data.gov (United States)

    Allegheny County / City of Pittsburgh / Western PA Regional Data Center — Here you can find Pittsburgh International Airport’s Monthly Scheduled Traffic Reports. Each of these reports contain a year-over-year (YOY) analysis of scheduled...

  14. DME Prosthetics Orthotics, and Supplies Fee Schedule

    Data.gov (United States)

    U.S. Department of Health & Human Services — Durable Medical Equipment, Prosthetics-Orthotics, and Supplies Fee Schedule. The list contains the fee schedule amounts, floors, and ceilings for all procedure codes...

  15. GSA eLibrary Schedules and Contracts

    Data.gov (United States)

    General Services Administration — GSA eLibrary (formerly Schedules e-Library) is the online source for the latest contract award information for: GSA Schedules; Department of Veterans Affairs (VA)...

  16. Interactive Anticipatory Scheduling for Two Military Applications

    National Research Council Canada - National Science Library

    Howe, Adele

    2003-01-01

    ...; these models partially explain what makes some job shop scheduling problems difficult. For the second, several algorithms for Air Force Satellite Control Network scheduling have been compared on historical and recent data...

  17. Network scheduling at Belene NPP construction site

    International Nuclear Information System (INIS)

    Matveev, A.

    2010-01-01

    Four types of schedules differing in the level of their detail are singled out to enhance the efficiency of Belene NPP Project implementation planning and monitoring: Level 1 Schedule–Summary Integrated Overall Time Schedule (SIOTS) is an appendix to EPC Contract. The main purpose of SIOTS is the large scale presentation of the current information on the Project implementation. Level 2 Schedule–Integrated Overall Time Schedule (IOTS)is the contract schedule for the Contractor (ASE JSC) and their subcontractors.The principal purpose of IOTS is the work progress planning and monitoring, the analysis of the effect of activities implementation upon the progress of the Project as a whole. IOTS is the reporting schedule at the Employer –Contractor level. Level 3 Schedules, Detail Time Schedules(DTS) are developed by those who actually perform the work and are agreed upon with Atomstroyexport JSC.The main purpose of DTS is the detail planning of Atomstroyexport subcontractor's activities. DTSare the reporting schedules at the level of Contractor-Subcontractor. Level 4 Schedules are the High Detail Time Schedules (HDTS), which are the day-to-day plans of work implementation and are developed, as a rule, for a week's time period.Each lower level time schedule details the activities of the higher level time schedule

  18. Vehicle and driver scheduling for public transit.

    Science.gov (United States)

    2009-08-01

    The problem of driver scheduling involves the construction of a legal set of shifts, including allowance : of overtime, which cover the blocks in a particular vehicle schedule. A shift is the work scheduled to be performed by : a driver in one day, w...

  19. An improved scheduling algorithm for linear networks

    KAUST Repository

    Bader, Ahmed; Alouini, Mohamed-Slim; Ayadi, Yassin

    2017-01-01

    In accordance with the present disclosure, embodiments of an exemplary scheduling controller module or device implement an improved scheduling process such that the targeted reduction in schedule length can be achieve while incurring minimal energy penalty by allowing for a large rate (or duration) selection alphabet.

  20. 40 CFR 141.702 - Sampling schedules.

    Science.gov (United States)

    2010-07-01

    ... serving at least 10,000 people must submit their sampling schedule for the initial round of source water... submitting the sampling schedule that EPA approves. (3) Systems serving fewer than 10,000 people must submit... analytical result for a scheduled sampling date due to equipment failure, loss of or damage to the sample...

  1. An improved scheduling algorithm for linear networks

    KAUST Repository

    Bader, Ahmed

    2017-02-09

    In accordance with the present disclosure, embodiments of an exemplary scheduling controller module or device implement an improved scheduling process such that the targeted reduction in schedule length can be achieve while incurring minimal energy penalty by allowing for a large rate (or duration) selection alphabet.

  2. 77 FR 41258 - FOIA Fee Schedule Update

    Science.gov (United States)

    2012-07-13

    ... DEFENSE NUCLEAR FACILITIES SAFETY BOARD 10 CFR Part 1703 FOIA Fee Schedule Update AGENCY: Defense Nuclear Facilities Safety Board. ACTION: Establishment of FOIA Fee Schedule. SUMMARY: The Defense Nuclear Facilities Safety Board is publishing its Freedom of Information Act (FOIA) Fee Schedule Update pursuant to...

  3. 76 FR 43819 - FOIA Fee Schedule Update

    Science.gov (United States)

    2011-07-22

    ... DEFENSE NUCLEAR FACILITIES SAFETY BOARD 10 CFR Part 1703 FOIA Fee Schedule Update AGENCY: Defense Nuclear Facilities Safety Board. ACTION: Establishment of FOIA Fee Schedule. SUMMARY: The Defense Nuclear Facilities Safety Board is publishing its Freedom of Information Act (FOIA) Fee Schedule Update pursuant to...

  4. 75 FR 7411 - Schedule of Water Charges

    Science.gov (United States)

    2010-02-19

    ... DELAWARE RIVER BASIN COMMISSION 18 CFR Part 410 Schedule of Water Charges AGENCY: Delaware River... Administrative Manual--Part III--Basin Regulations--Water Supply Charges to revise the schedule of water charges... commenter and the subject line ``Schedule of Water Charges.'' FOR FURTHER INFORMATION, CONTACT: Please...

  5. Mechanisms for scheduling games with selfish players

    NARCIS (Netherlands)

    Hoeksma, R.P.

    2015-01-01

    Many challenges in operations research involve optimization. In particular, scheduling treats the optimal planning of tasks. This thesis focuses on machine scheduling models, where a number of tasks, called jobs, need to be scheduled on one or more machines. The outcome is determined by which job is

  6. Military Free Fall Scheduling And Manifest Optimization Model

    Science.gov (United States)

    2016-12-01

    zone. As interest in qualifying more personnel increased, the course expanded. By the mid-1990s, Reyes explains, a new location was required to better...Since 2005, the Chilean Professional Soccer Association has used operations research techniques to schedule professional leagues in Chile . These...a new parachute the students are using, the RA-1. The RA-1 parachute has a longer glide ratio, which means the rate of descent is slower than with

  7. Influences on cocaine tolerance assessed under a multiple conjunctive schedule of reinforcement.

    Science.gov (United States)

    Yoon, Jin Ho; Branch, Marc N

    2009-11-01

    Under multiple schedules of reinforcement, previous research has generally observed tolerance to the rate-decreasing effects of cocaine that has been dependent on schedule-parameter size in the context of fixed-ratio (FR) schedules, but not under the context of fixed-interval (FI) schedules of reinforcement. The current experiment examined the effects of cocaine on key-pecking responses of White Carneau pigeons maintained under a three-component multiple conjunctive FI (10 s, 30 s, & 120 s) FR (5 responses) schedule of food presentation. Dose-effect curves representing the effects of presession cocaine on responding were assessed in the context of (1) acute administration of cocaine (2) chronic administration of cocaine and (3) daily administration of saline. Chronic administration of cocaine generally resulted in tolerance to the response-rate decreasing effects of cocaine, and that tolerance was generally independent of relative FI value, as measured by changes in ED50 values. Daily administration of saline decreased ED50 values to those observed when cocaine was administered acutely. The results show that adding a FR requirement to FI schedules is not sufficient to produce schedule-parameter-specific tolerance. Tolerance to cocaine was generally independent of FI-parameter under the present conjunctive schedules, indicating that a ratio requirement, per se, is not sufficient for tolerance to be dependent on FI parameter.

  8. Pathogenesis of PR3-ANCA associated vasculitis

    NARCIS (Netherlands)

    Kallenberg, C. G. M.

    2008-01-01

    Wegener's Granulomatosis (WG) is closely associated with antineutrophil cytoplasmic autoantibodies (ANCA), particularly those directed to proteinase 3 (PR3). ANCA directed to myeloperoxidase (MPO) are associated with microscopic polyangiitis (MPA) and the Churg Strauss syndrome. PR3-ANCA associated

  9. Cancer de la próstata

    OpenAIRE

    Mendoza, Lupi Alejandro; Fundación Valle de Lili; Gutierrez, María Carolina; López Cardona, Arturo

    1997-01-01

    ¿Qué es la próstata?/¿Qué es la hiperplasia benigna de próstata?/El cáncer de próstata/¿Se hereda el cáncer de próstata?/¿Cómo se presenta y hacia donde se disemina el cáncer de próstata?/¿Cómo de descubre el cáncer de próstata?/¿Qué estudia la ultrasonografía transrectal o ecografía a través de recto?/¿Cómo se analizan los niveles de PSA?/¿Cómo se clasifica el cáncer de próstata?¿Cómo se determina la terapia más adecuada para un cáncer de próstata?/¿Cuáles son las opciones de tratamiento par...

  10. Responsive versus scheduled feeding for preterm infants.

    Science.gov (United States)

    Watson, Julie; McGuire, William

    2015-10-13

    Feeding preterm infants in response to their hunger and satiation cues (responsive, cue-based, or infant-led feeding) rather than at scheduled intervals might enhance infants' and parents' experience and satisfaction, help in the establishment of independent oral feeding, increase nutrient intake and growth rates, and allow earlier hospital discharge. To assess the effect of feeding preterm infants on a responsive basis versus feeding prescribed volumes at scheduled intervals on growth, duration of hospital stay, and parental satisfaction. We used the standard search strategy of the Cochrane Neonatal Review Group. This included searches of the Cochrane Central Register of Controlled Trials (CENTRAL, The Cochrane Library, Issue 9, 2015), MEDLINE (1966 to September 2015), EMBASE (1980 to September 2015), and CINAHL (1982 to September 2015), conference proceedings, previous reviews, and trial registries. Randomised controlled trials (RCTs) or quasi-RCTs that compared a policy of feeding preterm infants on a responsive basis versus feeding at scheduled intervals. Two review authors assessed trial eligibility and risk of bias and undertook data extraction independently. We analysed the treatment effects in the individual trials and reported the risk ratio and risk difference for dichotomous data and mean difference (MD) for continuous data, with respective 95% confidence intervals (CIs). We used a fixed-effect model in meta-analyses and explored the potential causes of heterogeneity in sensitivity analyses. We found nine eligible RCTs including 593 infants in total. These trials compared responsive with scheduled interval regimens in preterm infants in the transition phase from intragastric tube to oral feeding. The trials were generally small and contained various methodological weaknesses including lack of blinding and incomplete assessment of all randomised participants. Meta-analyses, although limited by data quality and availability, suggest that responsive feeding

  11. The Use of Player-centered Positive Reinforcement to Schedule In-game Rewards Increases Enjoyment and Performance in a Serious Game

    Directory of Open Access Journals (Sweden)

    Aniket Nagle

    2014-10-01

    Full Text Available Among the methods used to increase enjoyment and performance in serious games, reward schedules, i.e., determining when in-game rewards should be given, have not been sufficiently explored. In the present study, we designed a simple memory training serious game and compared two methods of scheduling rewards, both based on the paradigm of positive reinforcement: fixed ratio schedule, in which rewards were given after a fixed number of correct responses, and variable ratio schedule, in which rewards were given after an unpredictable number of correct responses. To account for the variability in player preference for rewards, a player-centered sub-mode was included in both schedules by adjusting the schedule ratio according to player preference for rewards. The effectiveness of this approach was tested by comparing it against two more sub-modes: one which used a predetermined ratio, and another which set the ratio to the opposite of player preference. The game was put online and tested with 210 participants. Enjoyment, performance, duration of gameplay, and likelihood to play again were significantly higher in the player-centered sub-mode than the other sub-modes. On average, the variable-ratio schedule was better in the outcome measures than the fixed-ratio schedule. The results highlight the importance of in-game rewards, and indicate that giving rewards according to a player-centered variable-ratio schedule has the potential to make serious games more effective.

  12. Competency profile of PR professional in sport

    OpenAIRE

    Gazdíková, Lenka

    2013-01-01

    Title: Competency profile of PR professional in sport Objective: The objective is to identify competencies required to a position of PR professional in sport. The aim of a survey is to verify the level of competencies which follows compiling competency profile and comparison with existing profile of PR specialist. Methods: The objective is achieved using survey, interview and analysis of competency models database. Results: The result of this paper is competency profile of PR professional in ...

  13. Desempenho, eficiência de utilização dos nutrientes e estrutura do trato digestório de pintos de corte alimentados na fase pré-inicial com rações de diferentes formas físicas Performance, efficiency of nutrient utilization and gastrointestinal structures of broiler chick fed in prestarter phase with ratios with different physical form

    Directory of Open Access Journals (Sweden)

    Ednardo Rodrigues Freitas

    2008-01-01

    Full Text Available Este estudo foi realizado com o objetivo de avaliar o efeito da forma física da ração sobre o desempenho, a utilização dos nutrientes das rações e o desenvolvimento do trato disgestório de pintos de corte na primeira semana de vida. Foram utilizados 150 pintos machos Cobb distribuídos ao acaso em três tratamentos com cinco repetições de dez aves. Os tratamentos consistiram das formas físicas farelada, triturada e peletizada de uma ração pré-inicial comercial. Com exceção da moela, os órgãos do trato digestório e a estrutura morfométrica do intestino não foram influenciados pela forma física da ração. Maior digestibilidade do N foi obtida com a ração peletizada, enquanto a ração triturada possibilitou maior digestibilidade do EE. A energia metabolizável determinada para a ração farelada foi menor que a obtida nas demais formas físicas da ração. As aves alimentadas com raç��o farelada tiveram menor consumo de ração e ganho de peso e pior conversão alimentar. Ingeriram ainda menos energia, apresentaram menores retenções de proteína, gordura e energia corporal e utilizaram maior proporção da energia ingerida para produção de calor. As rações pré-iniciais na forma peletizada ou triturada possibilitam maior aproveitamento dos nutrientes da ração pelos pintos e melhor desempenho.This experiment was conducted to evaluate the effect of different physical form of pre-starter diet on performance, nutrient utilization and development of gastrointestinal tract of broiler chicks during the first week of age. A total of 150-day-old male broiler chicks was allotted to a completely randomized design with three treatments and five replicates of 10 birds each. Treatments consisted of three physical forms of a commercial pre-starter diet: mashed, crumbled and pressed into pellets. Except for gizzard, the other organs of the digestive tract and morphologic structures of the small intestine were not affected by

  14. Bruken av nasjonale prøver

    DEFF Research Database (Denmark)

    Skov, Poul

    2010-01-01

    Artiklen beskriver resultater fra en omfattende evaluering af brugen af de nationale prøver i norsk grundskole. De nationale prøver er blevet modtaget positivt af mange kommuner og skoleledere og i mindre grad af lærerne. Resultaterne viser også, at prøverne er styrende for undervisningen, at bru...

  15. It Is Not Just about the Schedule: Key Factors in Effective Reference Desk Scheduling and Management

    Science.gov (United States)

    Sciammarella, Susan; Fernandes, Maria Isabel; McKay, Devin

    2008-01-01

    Reference desk scheduling is one of the most challenging tasks in the organizational structure of an academic library. The ability to turn this challenge into a workable and effective function lies with the scheduler and indirectly the cooperation of all librarians scheduled for reference desk service. It is the scheduler's sensitivity to such…

  16. Financial Key Ratios

    OpenAIRE

    Tănase Alin-Eliodor

    2014-01-01

    This article focuses on computing techniques starting from trial balance data regarding financial key ratios. There are presented activity, liquidity, solvency and profitability financial key ratios. It is presented a computing methodology in three steps based on a trial balance.

  17. Cure Schedule for Stycast 2651/Catalyst 9.

    Energy Technology Data Exchange (ETDEWEB)

    Kropka, Jamie Michael [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); McCoy, John D. [New Mexico Inst. of Mining and Technology, Socorro, NM (United States)

    2017-11-01

    The Emerson & Cuming technical data sheet (TDS) for Stycast 2651/Catalyst 9 lists three alternate cure schedules for the material, each of which would result in a different state of reaction and different material properties. Here, a cure schedule that attains full reaction of the material is defined. The use of this cure schedule will eliminate variance in material properties due to changes in the cure state of the material, and the cure schedule will serve as the method to make material prior to characterizing properties. The following recommendation uses one of the schedules within the TDS and adds a “post cure” to obtain full reaction.

  18. Sex, PrEP, and Stigma: Experiences with HIV Pre-exposure Prophylaxis Among New York City MSM Participating in the HPTN 067/ADAPT Study.

    Science.gov (United States)

    Franks, Julie; Hirsch-Moverman, Yael; Loquere, Avelino S; Amico, K Rivet; Grant, Robert M; Dye, Bonnie J; Rivera, Yan; Gamboa, Robert; Mannheimer, Sharon B

    2018-04-01

    The HPTN 067/Alternative Dosing to Augment Pre-Exposure Prophylaxis Pill Taking (ADAPT) study evaluated daily and non-daily dosing schedules for oral pre-exposure prophylaxis (PrEP) to prevent HIV. A qualitative sub-study including focus groups and in-depth interviews was conducted among men who have sex with men participating in New York City to understand their experience with PrEP and study dosing schedules. The 37 sub-study participants were 68% black, 11% white, and 8% Asian; 27% were of Hispanic/Latino ethnicity. Mean age was 34 years. Themes resulting from qualitative analysis include: PrEP is a significant advance for HIV prevention; non-daily dosing of PrEP is congruent with HIV risk; and pervasive stigma connected to HIV and risk behavior is a barrier to PrEP adherence, especially for non-daily dosing schedules. The findings underscore how PrEP intersects with other HIV prevention practices and highlight the need to understand and address multidimensional stigma related to PrEP use.

  19. Optimizing Unmanned Aircraft System Scheduling

    Science.gov (United States)

    2008-06-01

    ASC-U uses a deterministic algorithm to optimize over a given finite time horizon to obtain near-optimal UAS mission area assignments. ASC-U...the details of the algorithm . We set an upper bound on the total number of schedules that can be generated, so as not to create unsolvable ILPs. We...COL_MISSION_NAME)) If Trim( CStr (rMissions(iRow, COL_MISSION_REQUIRED))) <> "" Then If CLng(rMissions(iRow, COL_MISSION_REQUIRED)) > CLng

  20. PR Interval Prolongation and Cryptogenic Stroke: A Multicenter Retrospective Study.

    Science.gov (United States)

    Montalvo, Mayra; Tadi, Prasanna; Merkler, Alexander; Gialdini, Gino; Martin-Schild, Sheryl; Navalkele, Digvijaya; Samai, Alyana; Nouh, Amre; Hussain, Mohammad; Goldblatt, Steven; Hemendinger, Morgan; Chu, Antony; Song, Christopher; Kamel, Hooman; Furie, Karen L; Yaghi, Shadi

    2017-10-01

    Atrial dysfunction or "cardiopathy" has been recently proposed as a mechanism in cryptogenic stroke. A prolonged PR interval may reflect impaired atrial conduction and thus may be a biomarker of atrial cardiopathy. We aim to compare the prevalence of PR interval prolongation in patients with cryptogenic stroke (CS) when compared with known non-cryptogenic non-cardioembolic stroke (NCNCS) subtypes. We used prospective ischemic stroke databases of 3 comprehensive stroke centers to identify patients 18 years or older with a discharge diagnosis of ischemic non-cardioembolic stroke between December 1, 2013 and August 31, 2015. The main outcome was ischemic stroke subtype (CS versus NCNCS). We compared PR intervals as a continuous and categorical variable (PR interval prolongation and CS. We identified 644 patients with ischemic non-cardioembolic stroke (224 CS and 420 NCNCS). Patients with CS were more likely to have a PR of 200 milliseconds or greater when compared with those with NCNCS (23.2% versus 13.8%, P = .009). After adjusting for factors that were significant in univariate analyses, a PR of 200 milliseconds or greater was independently associated with CS (odds ratio [OR] 1.70, 95% CI 1.08-2.70). The association was more pronounced when excluding patients on atrioventricular nodal blocking agents (OR 2.64, 95% CI 1.44-4.83). A PR of 200 milliseconds or greater is associated with CS and may be a biomarker of atrial cardiopathy in the absence of atrial fibrillation. Prospective studies are needed to confirm this association. Copyright © 2017 National Stroke Association. Published by Elsevier Inc. All rights reserved.

  1. A System for Automatically Generating Scheduling Heuristics

    Science.gov (United States)

    Morris, Robert

    1996-01-01

    The goal of this research is to improve the performance of automated schedulers by designing and implementing an algorithm by automatically generating heuristics by selecting a schedule. The particular application selected by applying this method solves the problem of scheduling telescope observations, and is called the Associate Principal Astronomer. The input to the APA scheduler is a set of observation requests submitted by one or more astronomers. Each observation request specifies an observation program as well as scheduling constraints and preferences associated with the program. The scheduler employs greedy heuristic search to synthesize a schedule that satisfies all hard constraints of the domain and achieves a good score with respect to soft constraints expressed as an objective function established by an astronomer-user.

  2. Routine environmental monitoring schedule, calendar year 1995

    International Nuclear Information System (INIS)

    Schmidt, J.W.; Markes, B.M.; McKinney, S.M.

    1994-12-01

    This document provides Bechtel Hanford, Inc. (BHI) and Westinghouse Hanford Company (WHC) a schedule of monitoring and sampling routines for the Operational Environmental Monitoring (OEM) program during calendar year (CY) 1995. Every attempt will be made to consistently follow this schedule; any deviation from this schedule will be documented by an internal memorandum (DSI) explaining the reason for the deviation. The DSI will be issued by the scheduled performing organization and directed to Near-Field Monitoring. The survey frequencies for particular sites are determined by the technical judgment of Near-Field Monitoring and may depend on the site history, radiological status, use and general conditions. Additional surveys may be requested at irregular frequencies if conditions warrant. All radioactive wastes sites are scheduled to be surveyed at least annually. Any newly discovered wastes sites not documented by this schedule will be included in the revised schedule for CY 1995

  3. Accuracy of progress ratios determined from experience curves: the case of photovoltaic technology development

    OpenAIRE

    van Sark, W.G.J.H.M.; Alsema, E.A.; Junginger, H.M.; de Moor, H.H.C.; Schaeffer, G.J.

    2008-01-01

    Learning curves are extensively used in policy and scenario studies. Progress ratios (PRs) are derived from historical data and are used for forecasting cost development of many technologies, including photovoltaics (PV). Forecasts are highly sensitive to uncertainties in the PR. A PR usually is determined together with the coefficient of determination R2, which should approach unity for a good fit of the available data. Although the R2 is instructive, we recommend using the error in the PR d...

  4. Schedule optimization study implementation plan

    International Nuclear Information System (INIS)

    1993-11-01

    This Implementation Plan is intended to provide a basis for improvements in the conduct of the Environmental Restoration (ER) Program at Hanford. The Plan is based on the findings of the Schedule Optimization Study (SOS) team which was convened for two weeks in September 1992 at the request of the U.S. Department of Energy (DOE) Richland Operations Office (RL). The need for the study arose out of a schedule dispute regarding the submission of the 1100-EM-1 Operable Unit (OU) Remedial Investigation/Feasibility Study (RI/FS) Work Plan. The SOS team was comprised of independent professionals from other federal agencies and the private sector experienced in environmental restoration within the federal system. The objective of the team was to examine reasons for the lengthy RI/FS process and recommend ways to expedite it. The SOS team issued their Final Report in December 1992. The report found the most serious impediments to cleanup relate to a series of management and policy issues which are within the control of the three parties managing and monitoring Hanford -- the DOE, U.S. Environmental Protection Agency (EPA), and the State of Washington Department of Ecology (Ecology). The SOS Report identified the following eight cross-cutting issues as the root of major impediments to the Hanford Site cleanup. Each of these eight issues is quoted from the SOS Report followed by a brief, general description of the proposed approach being developed

  5. Environmental surveillance master sampling schedule

    International Nuclear Information System (INIS)

    Bisping, L.E.

    1994-02-01

    This document contains the planned 1994 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP), Drinking Water Project, and Ground-Water Surveillance Project. Samples are routinely collected for the SESP and analyzed to determine the quality of air, surface water, soil, sediment, wildlife, vegetation, foodstuffs, and farm products at Hanford Site and surrounding communities. The responsibility for monitoring the onsite drinking water falls outside the scope of the SESP. The Hanford Environmental Health Foundation is responsible for monitoring the nonradiological parameters as defined in the National Drinking Water Standards while PNL conducts the radiological monitoring of the onsite drinking water. PNL conducts the drinking water monitoring project concurrent with the SESP to promote efficiency and consistency, utilize the expertise developed over the years, and reduce costs associated with management, procedure development, data management, quality control and reporting. The ground-water sampling schedule identifies ground-water sampling events used by PNL for environmental surveillance of the Hanford Site

  6. Environmental surveillance master sampling schedule

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, L.E.

    1994-02-01

    This document contains the planned 1994 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP), Drinking Water Project, and Ground-Water Surveillance Project. Samples are routinely collected for the SESP and analyzed to determine the quality of air, surface water, soil, sediment, wildlife, vegetation, foodstuffs, and farm products at Hanford Site and surrounding communities. The responsibility for monitoring the onsite drinking water falls outside the scope of the SESP. The Hanford Environmental Health Foundation is responsible for monitoring the nonradiological parameters as defined in the National Drinking Water Standards while PNL conducts the radiological monitoring of the onsite drinking water. PNL conducts the drinking water monitoring project concurrent with the SESP to promote efficiency and consistency, utilize the expertise developed over the years, and reduce costs associated with management, procedure development, data management, quality control and reporting. The ground-water sampling schedule identifies ground-water sampling events used by PNL for environmental surveillance of the Hanford Site.

  7. Opportunistic Nonorthogonal Packet Scheduling in Fixed Broadband Wireless Access Networks

    Directory of Open Access Journals (Sweden)

    Ahmed Mohamed H

    2006-01-01

    Full Text Available In order to mitigate high cochannel interference resulting from dense channel reuse, the interference management issues are often considered as essential part of scheduling schemes in fixed broadband wireless access (FBWA networks. To that end, a series of literature has been published recently, in which a group of base stations forms an interferer group (downlink transmissions from each base station become dominant interference for the users in other in-group base stations, and the scheduling scheme deployed in the group allows only one base station to transmit at a time. As a result of time orthogonality in transmissions, the dominant cochannel interferers are prevented, and hence the packet error rate can be improved. However, prohibiting concurrent transmissions in these orthogonal schemes introduces throughput penalty as well as higher end-to-end packet delay which might not be desirable for real-time services. In this paper, we utilize opportunistic nonorthogonality among the in-group transmissions whenever possible and propose a novel transmission scheduling scheme for FBWA networks. The proposed scheme, in contrast to the proactive interference avoidance techniques, strives for the improvements in delay and throughput efficiency. To facilitate opportunistic nonorthogonal transmissions in the interferer group, estimation of signal-to-interference-plus-noise ratio (SINR is required at the scheduler. We have observed from simulations that the proposed scheme outperforms the reference orthogonal scheme in terms of spectral efficiency, mean packet delay, and packet dropping rate.

  8. Isothermal sections of the state diagram for the Pr-Ni-Ge system at 870 (0-0,5Pr) and 670 K (0,5-1Pr)

    International Nuclear Information System (INIS)

    Fedyna, M.F.; Pecharskij, V.K.; Bodak, O.I.

    1987-01-01

    Method of X-ray phase and microstructural analyses were used to study Pr-Ni-Ge ternary system at 870K (0-0.50 at.fractions of Pr) and 670K (0.50-1.00 at.fractions of Pr). 11 ternary compounds exist in the system: Pr 1-x (NiGe) 13 (x=0.24), PrNi 2 Ge 2 , Pr 2 Ni 3 Ge 5 , PrNiGe 3 , Pr 2 NiGe 6 , Pr 3 Ni 4 Ge 4 , PrNi (1-x) Ge 2 (x=0.33), PrNiGe, Pr(NiGe) 2-x (x=0.14), Pr 3 NiGe 2 , ∼Pr 5 NiGe 4 . Crystal structure was determined for seven ternary compounds

  9. Accuracy of progress ratios determined from experience curves: the case of photovoltaic technology development

    NARCIS (Netherlands)

    van Sark, W.G.J.H.M.|info:eu-repo/dai/nl/074628526; Alsema, E.A.|info:eu-repo/dai/nl/073416258; Junginger, H.M.|info:eu-repo/dai/nl/202130703; de Moor, H.H.C.; Schaeffer, G.J.

    2008-01-01

    Learning curves are extensively used in policy and scenario studies. Progress ratios (PRs) are derived from historical data and are used for forecasting cost development of many technologies, including photovoltaics (PV). Forecasts are highly sensitive to uncertainties in the PR. A PR usually is

  10. VVER-1000 dominance ratio

    International Nuclear Information System (INIS)

    Gorodkov, S.

    2009-01-01

    Dominance ratio, or more precisely, its closeness to unity, is important characteristic of large reactor. It allows evaluate beforehand the number of source iterations required in deterministic calculations of power spatial distribution. Or the minimal number of histories to be modeled for achievement of statistical error level desired in large core Monte Carlo calculations. In this work relatively simple approach for dominance ratio evaluation is proposed. It essentially uses core symmetry. Dependence of dominance ratio on neutron flux spatial distribution is demonstrated. (author)

  11. WWER-1000 dominance ratio

    International Nuclear Information System (INIS)

    Gorodkov, S.S.

    2009-01-01

    Dominance ratio, or more precisely, its closeness to unity, is important characteristic of large reactor. It allows evaluate beforehand the number of source iterations required in deterministic calculations of power spatial distribution. Or the minimal number of histories to be modeled for achievement of statistical error level desired in large core Monte Carlo calculations. In this work relatively simple approach for dominance ratio evaluation is proposed. It essentially uses core symmetry. Dependence of dominance ratio on neutron flux spatial distribution is demonstrated. (Authors)

  12. Sharpening Sharpe Ratios

    OpenAIRE

    William N. Goetzmann; Jonathan E. Ingersoll Jr.; Matthew I. Spiegel; Ivo Welch

    2002-01-01

    It is now well known that the Sharpe ratio and other related reward-to-risk measures may be manipulated with option-like strategies. In this paper we derive the general conditions for achieving the maximum expected Sharpe ratio. We derive static rules for achieving the maximum Sharpe ratio with two or more options, as well as a continuum of derivative contracts. The optimal strategy has a truncated right tail and a fat left tail. We also derive dynamic rules for increasing the Sharpe ratio. O...

  13. A Novel Message Scheduling Framework for Delay Tolerant Networks Routing

    KAUST Repository

    Elwhishi, Ahmed

    2013-05-01

    Multicopy routing strategies have been considered the most applicable approaches to achieve message delivery in Delay Tolerant Networks (DTNs). Epidemic routing and two-hop forwarding routing are two well-reported approaches for delay tolerant networks routing which allow multiple message replicas to be launched in order to increase message delivery ratio and/or reduce message delivery delay. This advantage, nonetheless, is at the expense of additional buffer space and bandwidth overhead. Thus, to achieve efficient utilization of network resources, it is important to come up with an effective message scheduling strategy to determine which messages should be forwarded and which should be dropped in case of buffer is full. This paper investigates a new message scheduling framework for epidemic and two-hop forwarding routing in DTNs, such that the forwarding/dropping decision can be made at a node during each contact for either optimal message delivery ratio or message delivery delay. Extensive simulation results show that the proposed message scheduling framework can achieve better performance than its counterparts.

  14. Parallel Machine Scheduling with Batch Delivery to Two Customers

    Directory of Open Access Journals (Sweden)

    Xueling Zhong

    2015-01-01

    Full Text Available In some make-to-order supply chains, the manufacturer needs to process and deliver products for customers at different locations. To coordinate production and distribution operations at the detailed scheduling level, we study a parallel machine scheduling model with batch delivery to two customers by vehicle routing method. In this model, the supply chain consists of a processing facility with m parallel machines and two customers. A set of jobs containing n1 jobs from customer 1 and n2 jobs from customer 2 are first processed in the processing facility and then delivered to the customers directly without intermediate inventory. The problem is to find a joint schedule of production and distribution such that the tradeoff between maximum arrival time of the jobs and total distribution cost is minimized. The distribution cost of a delivery shipment consists of a fixed charge and a variable cost proportional to the total distance of the route taken by the shipment. We provide polynomial time heuristics with worst-case performance analysis for the problem. If m=2 and (n1-b(n2-b<0, we propose a heuristic with worst-case ratio bound of 3/2, where b is the capacity of the delivery shipment. Otherwise, the worst-case ratio bound of the heuristic we propose is 2-2/(m+1.

  15. Planning construction of integrative schedule management for nuclear power project

    International Nuclear Information System (INIS)

    Zeng Zhenglin; Wang Wenying; Peng Fei

    2012-01-01

    This paper introduces the planning construction of integrative schedule management for Nuclear Power Project. It details schedule management system and the requirement of schedulers and the mode of three schedule management flats. And analysis it combing with the implementation of construction water and all special schedules before FCD to further propose the improving and researching direction for the integrative schedule management. (authors)

  16. A Formal Product-Line Engineering Approach for Schedulers

    NARCIS (Netherlands)

    Orhan, Güner; Aksit, Mehmet; Rensink, Arend; Jololian, Leon; Robbins, David E.; Fernandes, Steven L.

    2017-01-01

    Scheduling techniques have been applied to a large category of software systems, such as, processor scheduling in operating systems, car scheduling in elevator systems, facility scheduling at airports, antenna scheduling in radar systems, scheduling of events, control signals and data in

  17. The CHI 2013 interactive schedule

    DEFF Research Database (Denmark)

    Satyanarayan, Arvind; Strazzulla, Daniel; Klokmose, Clemens Nylandsted

    2013-01-01

    CHI 2013 offers over 500 separate events including paper presentations, panels, courses, case studies and special interest groups. Given the size of the conference, it is no longer practical to host live summaries of these events. Instead, a 30-second Video Preview summary of each event is availa......CHI 2013 offers over 500 separate events including paper presentations, panels, courses, case studies and special interest groups. Given the size of the conference, it is no longer practical to host live summaries of these events. Instead, a 30-second Video Preview summary of each event...... is available. The CHI'13 Interactive Schedule helps attendees navigate this wealth of video content in order to identify events they would like to attend. It consists of a number of large display screens throughout the conference venue which cycle through a video playlist of events. Attendees can interact...

  18. The ASDEX Upgrade discharge schedule

    International Nuclear Information System (INIS)

    Neu, G.; Engelhardt, K.; Raupp, G.; Treutterer, W.; Zasche, D.; Zehetbauer, T.

    2007-01-01

    ASDEX Upgrade's recently commissioned discharge control system (DCS) marks the transition from a traditional programmed system to a highly flexible 'data driven' one. The allocation of application processes (APs) to controllers, the interconnection of APs through uniquely named signals, and AP control parameter values are all defined as data, and can easily be adapted to the requirements of a particular discharge. The data is laid down in a set of XML documents which APs request via HTTP from a configuration server before a discharge. The use of XML allows for easy parsing, and structural validation through (XSD) schemas. The central input to the configuration process is the discharge schedule (DS), which embodies the dynamic behaviour of a planned discharge as reference trajectories grouped in segments, concatenated through transition conditions. Editing, generation and validation tools, and version control through CVS allow for efficient management of DSs

  19. Environmental surveillance master sampling schedule

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, L E

    1992-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE). This document contains the planned schedule for routine sample collection for the Surface Environmental Surveillance Project (SESP) and Ground-Water Monitoring Project. Samples for radiological analyses include Air-Particulate Filter, gases and vapor; Water/Columbia River, Onsite Pond, Spring, Irrigation, and Drinking; Foodstuffs/Animal Products including Whole Milk, Poultry and Eggs, and Beef; Foodstuffs/Produce including Leafy Vegetables, Vegetables, and Fruit; Foodstuffs/Farm Products including Wine, Wheat and Alfalfa; Wildlife; Soil; Vegetation; and Sediment. Direct Radiation Measurements include Terrestrial Locations, Columbia River Shoreline Locations, and Onsite Roadway, Railway and Aerial, Radiation Surveys.

  20. Planning and Scheduling of Airline Operations

    Directory of Open Access Journals (Sweden)

    İlkay ORHAN

    2010-02-01

    Full Text Available The Turkish Civil Aviation sector has grown at a rate of 53 % between the years 2002-2008 owing to countrywide economical developments and some removed restrictions in the aviation field. Successful international companies in the sector use advanced computer-supported solution methods for their planning and scheduling problems. These methods have been providing significant competitive advantages to those companies. There are four major scheduling and planning problems in the airline sector: flight scheduling, aircraft scheduling, crew scheduling and disruptions management. These aforementioned scheduling and planning problems faced by all airline companies in the airline sector were examined in detail. Studies reveal that companies using the advanced methods might gain significant cost reductions. However, even then, the time required for solving large scale problems may not satisfy the decision quality desired by decision makers. In such cases, using modern decision methods integrated with advanced technologies offer companies an opportunity for significant cost-advantages.

  1. Optimization of Hierarchically Scheduled Heterogeneous Embedded Systems

    DEFF Research Database (Denmark)

    Pop, Traian; Pop, Paul; Eles, Petru

    2005-01-01

    We present an approach to the analysis and optimization of heterogeneous distributed embedded systems. The systems are heterogeneous not only in terms of hardware components, but also in terms of communication protocols and scheduling policies. When several scheduling policies share a resource......, they are organized in a hierarchy. In this paper, we address design problems that are characteristic to such hierarchically scheduled systems: assignment of scheduling policies to tasks, mapping of tasks to hardware components, and the scheduling of the activities. We present algorithms for solving these problems....... Our heuristics are able to find schedulable implementations under limited resources, achieving an efficient utilization of the system. The developed algorithms are evaluated using extensive experiments and a real-life example....

  2. Choice with frequently changing food rates and food ratios.

    Science.gov (United States)

    Baum, William M; Davison, Michael

    2014-03-01

    In studies of operant choice, when one schedule of a concurrent pair is varied while the other is held constant, the constancy of the constant schedule may exert discriminative control over performance. In our earlier experiments, schedules varied reciprocally across components within sessions, so that while food ratio varied food rate remained constant. In the present experiment, we held one variable-interval (VI) schedule constant while varying the concurrent VI schedule within sessions. We studied five conditions, each with a different constant left VI schedule. On the right key, seven different VI schedules were presented in seven different unsignaled components. We analyzed performances at several different time scales. At the longest time scale, across conditions, behavior ratios varied with food ratios as would be expected from the generalized matching law. At shorter time scales, effects due to holding the left VI constant became more and more apparent, the shorter the time scale. In choice relations across components, preference for the left key leveled off as the right key became leaner. Interfood choice approximated strict matching for the varied right key, whereas interfood choice hardly varied at all for the constant left key. At the shortest time scale, visit patterns differed for the left and right keys. Much evidence indicated the development of a fix-and-sample pattern. In sum, the procedural difference made a large difference to performance, except for choice at the longest time scale and the fix-and-sample pattern at the shortest time scale. © Society for the Experimental Analysis of Behavior.

  3. Photoemission of heavy fermion superconductor PrOs4Sb12 and other Pr compounds

    International Nuclear Information System (INIS)

    Imada, S.; Yamasaki, A.; Sekiyama, A.; Settai, R.; Onuki, Y.; Suga, S.; Sugawara, H.; Sato, H.; Ochiai, A.

    2004-01-01

    Full text: Strongly correlated electronic states due to Pr 4f electrons found in several Pr compounds have recently been attracting much attention. The Pr 4f electrons are much more localized than in Ce due to the lanthanoid contraction. Therefore, the number of the Pr systems that show strong electron correlation is much smaller than Ce systems. We will present a comparative study of Pr 4f electronic states in such systems as the heavy fermion superconductor PrOs 4 Sb 12 , the Kondo system PrSn 3 and the localized 4f systems Pr 4 X 3 (X = Sb and Bi). The Pr 4f electronic state was probed by means of the Pr 3d → 4f resonant photoemission (RPES). Because the kinetic energy (E K ) of the photoelectrons is as high as ∼ 900 eV, this method is much more bulk sensitive than the 4d → 4f RPES with E K ∼ 100 eV. The energy resolution could be set to about 100 meV by utilizing the soft X-rays from BL25SU in SPring-8 and the SCIENTA SES-200 analyzer. The Pr 4f excitation spectrum of PrSn 3 was found to show a very strong intensity at the Fermi level (E F ). This can be interpreted as the Kondo resonance which has been observed in the Kondo Ce and Yb compounds. In the Pr 4f spectrum of the heavy fermion superconductor PrOs 4 Sb 12 , the intensity at E F was smaller than in PrSn 3 . This clearly shows that the Kondo temperature (T K ) is much lower in PrOs 4 Sb 12 than in PrSn 3 . We have further found a strong excitation energy dependence in the RPES line shape. In the case of Pr 4 X 3 (X = Sb and Bi), the intensity at E B was much smaller than PrSn 3 and PrOs 4 Sb 12 , which is consistent with the localized character of Pr 4f electrons in Pr 4 X 3 . The Pr 4f spectra of these localized systems are qualitatively well reproduced by a cluster model calculation that takes into account the hybridization between the Pr 4f orbital and the conduction and valence bands made up by the X p and Pr 5d states

  4. Identification and expression analysis of a pathogenresponsive PR ...

    African Journals Online (AJOL)

    related (PR) proteins. PR-1 genes represent the first identified PR gene family. Most members of PR-1 gene family are not inducible by pathogen attacks. In this study, we identified a pathogen-responsive PR-1 gene designated as VqPR-1 ...

  5. Evolution of structural, magnetic and transport behavior by Pr doping in SrRuO3

    Science.gov (United States)

    Gupta, Renu; Pramanik, A. K.

    2018-05-01

    Here we report the evolution of structural, magnetic and transport behavior in perovskite based ruthenates Sr1-xPrxRuO3 (x=0.0 and 0.1). The substitution of Pr on Sr site retains orthorhombic structure while we find the slight change in structural parameters. The SrRuO3 has itinerant ferromagnet (FM) type nature of ordering temperature ˜160 K and below the transition temperature showing large bifurcation between ZFC and FC magnetization. By Pr doping, the magnetic moment decreases with decreasing bifurcation of ZFC and FC. The ZFC data show three distinct peaks (three transition temperature; TM1,TM2 and TM3). The magnetization study of both the samples, at high temperature fitted with modified CWL showing the decreasing value of ordering temperature by Pr doping matches close to TM2. The low-temperature isothermal magnetization M (H) data show that the high field saturation moment has decreased by Pr doping. The Arrott plot gives spontaneous magnetization (Ms) which is also decreased by Pr substitution. Evolution of Rhodes-Wohlfarth ratio value increases, which suggests that FM in this system evolves toward the more itinerant type by Pr doping. The electrical resistivity ρ(T) of both the samples show metallic behavior, in the all temperature range and ρ(T) increases by Pr doping while around below 45 K, the resistivity decreases by Pr doping and this crossing temperature also matches with ZFC data.

  6. Analisis Performansi Algoritma Penjadwalan Log Rule dan Frame Level Schedule Skenario Multicell Pada Layer Mac LTE

    Directory of Open Access Journals (Sweden)

    Ridwan

    2016-03-01

    Full Text Available Mobile telecommunications technology gradually evolved to support better services such as voice, data, and video to users of telecommunications services. LTE (Long Term Evolution is a network based on Internet Protocol (IP standardized by 3rd Generation Partnership Project (3GPP. To support it, LTE requires a mechanism that can support. One of them by applying methods of scheduling packets in each service. Scheduling is a different treatment to packets that come in accordance with the priorities of the scheduling algorithm. In this research, to analyze the performance of LTE with paramater delay, packet loss ratio, throughput and fairness index uses a scheduling algorithms Frame Level Schedule (FLS and Log Rule on LTE-Simulator with scenarios using Voip traffic, Video and Best Effort (BE. The results is scheduling algorithms FLS is better than log rule in term of throughput values, while of scheduling algorithms log rule is better than FLS in terms of delay based on the number and speed of the users. This indicates that both scheduling algorithms suitable for use in LTE networks within conditions of traffic real time services, but not for non real time services such as BE.

  7. On Coding of Scheduling Information in OFDM

    OpenAIRE

    Gunnarsson, Fredrik; Moosavi, Reza; Eriksson, Jonas; Larsson, Erik G.; Wiberg, Niklas; Frenger, Pål

    2009-01-01

    Control signaling strategies for scheduling information in cellular OFDM systems are studied. A single-cell multiuser system model is formulated that provides system capacity estimates accounting for the signaling overhead. Different scheduling granularities are considered, including the one used in the specifications for the 3G Long Term Evolution (LTE). A greedy scheduling method is assumed, where each resource is assigned to the user for which it can support the highest number of bits. The...

  8. Management of Temporal Constraints for Factory Scheduling.

    Science.gov (United States)

    1987-06-01

    consistency of scheduling decisions were implemented in both the ISIS [Fox 84] and SOJA [LePape 85a] scheduling systems. More recent work with the...kinds of time propagation systems: the symbolic and the numeric ones. Symbolic systems combine relationships with a temporal logic a la Allen [Allen 81...maintains consistency by narrowing time windows associated with activities as decisions are made, and SOJA [LePape 85b] guarantees a schedule’s

  9. Cost effective shift schedules enhance utility operations

    International Nuclear Information System (INIS)

    Coleman, R.M.

    1995-01-01

    This article describes how new shift scheduling concepts can save utility operations millions of dollars every year and yet maintain safety and improve employee morale. The key to scheduling is to define and match the work load. This includes discretionary as well as daily, weekly, and yearly core work loads. In most power plants the overall work load (including maintenance, operations, materials handling, etc.) on day shift is greater than on other shifts, hence an unbalanced schedule would be appropriate

  10. Trustable Virtual Machine Scheduling in a Cloud

    OpenAIRE

    Hermenier , Fabien; Henrio , Ludovic

    2017-01-01

    International audience; In an Infrastructure As A Service (IaaS) cloud, the scheduler deploys VMs to servers according to service level objectives (SLOs). Clients and service providers must both trust the infrastructure. In particular they must be sure that the VM scheduler takes decisions that are consistent with its advertised behaviour. The difficulties to master every theoretical and practical aspects of a VM scheduler implementation leads however to faulty behaviours that break SLOs and ...

  11. Flow shop scheduling with heterogeneous workers

    OpenAIRE

    Benavides, Alexander J.; Ritt, Marcus; Miralles Insa, Cristóbal Javier

    2014-01-01

    We propose an extension to the flow shop scheduling problem named Heterogeneous Flow Shop Scheduling Problem (Het-FSSP), where two simultaneous issues have to be resolved: finding the best worker assignment to the workstations, and solving the corresponding scheduling problem. This problem is motivated by Sheltered Work centers for Disabled, whose main objective is the labor integration of persons with disabilities, an important aim not only for these centers but for any company d...

  12. A hybrid job-shop scheduling system

    Science.gov (United States)

    Hellingrath, Bernd; Robbach, Peter; Bayat-Sarmadi, Fahid; Marx, Andreas

    1992-01-01

    The intention of the scheduling system developed at the Fraunhofer-Institute for Material Flow and Logistics is the support of a scheduler working in a job-shop. Due to the existing requirements for a job-shop scheduling system the usage of flexible knowledge representation and processing techniques is necessary. Within this system the attempt was made to combine the advantages of symbolic AI-techniques with those of neural networks.

  13. LEARNING SCHEDULER PARAMETERS FOR ADAPTIVE PREEMPTION

    OpenAIRE

    Prakhar Ojha; Siddhartha R Thota; Vani M; Mohit P Tahilianni

    2015-01-01

    An operating system scheduler is expected to not allow processor stay idle if there is any process ready or waiting for its execution. This problem gains more importance as the numbers of processes always outnumber the processors by large margins. It is in this regard that schedulers are provided with the ability to preempt a running process, by following any scheduling algorithm, and give us an illusion of simultaneous running of several processes. A process which is allowed t...

  14. Spent nuclear fuel project integrated schedule plan

    International Nuclear Information System (INIS)

    Squires, K.G.

    1995-01-01

    The Spent Nuclear Fuel Integrated Schedule Plan establishes the organizational responsibilities, rules for developing, maintain and status of the SNF integrated schedule, and an implementation plan for the integrated schedule. The mission of the SNFP on the Hanford site is to provide safe, economic, environmentally sound management of Hanford SNF in a manner which stages it to final disposition. This particularly involves K Basin fuel

  15. Spent nuclear fuel project integrated schedule plan

    Energy Technology Data Exchange (ETDEWEB)

    Squires, K.G.

    1995-03-06

    The Spent Nuclear Fuel Integrated Schedule Plan establishes the organizational responsibilities, rules for developing, maintain and status of the SNF integrated schedule, and an implementation plan for the integrated schedule. The mission of the SNFP on the Hanford site is to provide safe, economic, environmentally sound management of Hanford SNF in a manner which stages it to final disposition. This particularly involves K Basin fuel.

  16. Detecting isotopic ratio outliers

    International Nuclear Information System (INIS)

    Bayne, C.K.; Smith, D.H.

    1985-01-01

    An alternative method is proposed for improving isotopic ratio estimates. This method mathematically models pulse-count data and uses iterative reweighted Poisson regression to estimate model parameters to calculate the isotopic ratios. This computer-oriented approach provides theoretically better methods than conventional techniques to establish error limits and to identify outliers. 6 refs., 3 figs., 3 tabs

  17. Detecting isotopic ratio outliers

    Science.gov (United States)

    Bayne, C. K.; Smith, D. H.

    An alternative method is proposed for improving isotopic ratio estimates. This method mathematically models pulse-count data and uses iterative reweighted Poisson regression to estimate model parameters to calculate the isotopic ratios. This computer-oriented approach provides theoretically better methods than conventional techniques to establish error limits and to identify outliers.

  18. Detecting isotopic ratio outliers

    International Nuclear Information System (INIS)

    Bayne, C.K.; Smith, D.H.

    1986-01-01

    An alternative method is proposed for improving isotopic ratio estimates. This method mathematically models pulse-count data and uses iterative reweighted Poisson regression to estimate model parameters to calculate the isotopic ratios. This computer-oriented approach provides theoretically better methods than conventional techniques to establish error limits and to identify outliers

  19. Cloud Service Scheduling Algorithm Research and Optimization

    Directory of Open Access Journals (Sweden)

    Hongyan Cui

    2017-01-01

    Full Text Available We propose a cloud service scheduling model that is referred to as the Task Scheduling System (TSS. In the user module, the process time of each task is in accordance with a general distribution. In the task scheduling module, we take a weighted sum of makespan and flowtime as the objective function and use an Ant Colony Optimization (ACO and a Genetic Algorithm (GA to solve the problem of cloud task scheduling. Simulation results show that the convergence speed and output performance of our Genetic Algorithm-Chaos Ant Colony Optimization (GA-CACO are optimal.

  20. A customizable, scalable scheduling and reporting system.

    Science.gov (United States)

    Wood, Jody L; Whitman, Beverly J; Mackley, Lisa A; Armstrong, Robert; Shotto, Robert T

    2014-06-01

    Scheduling is essential for running a facility smoothly and for summarizing activities in use reports. The Penn State Hershey Clinical Simulation Center has developed a scheduling interface that uses off-the-shelf components, with customizations that adapt to each institution's data collection and reporting needs. The system is designed using programs within the Microsoft Office 2010 suite. Outlook provides the scheduling component, while the reporting is performed using Access or Excel. An account with a calendar is created for the main schedule, with separate resource accounts created for each room within the center. The Outlook appointment form's 2 default tabs are used, in addition to a customized third tab. The data are then copied from the calendar into either a database table or a spreadsheet, where the reports are generated.Incorporating this system into an institution-wide structure allows integration of personnel lists and potentially enables all users to check the schedule from their desktop. Outlook also has a Web-based application for viewing the basic schedule from outside the institution, although customized data cannot be accessed. The scheduling and reporting functions have been used for a year at the Penn State Hershey Clinical Simulation Center. The schedule has increased workflow efficiency, improved the quality of recorded information, and provided more accurate reporting. The Penn State Hershey Clinical Simulation Center's scheduling and reporting system can be adapted easily to most simulation centers and can expand and change to meet future growth with little or no expense to the center.

  1. 15 CFR 700.14 - Preferential scheduling.

    Science.gov (United States)

    2010-01-01

    ...) BUREAU OF INDUSTRY AND SECURITY, DEPARTMENT OF COMMERCE NATIONAL SECURITY INDUSTRIAL BASE REGULATIONS DEFENSE PRIORITIES AND ALLOCATIONS SYSTEM Industrial Priorities § 700.14 Preferential scheduling. (a) A...

  2. BIM-BASED SCHEDULING OF CONSTRUCTION

    DEFF Research Database (Denmark)

    Andersson, Niclas; Büchmann-Slorup, Rolf

    2010-01-01

    The potential of BIM is generally recognized in the construction industry, but the practical application of BIM for management purposes is, however, still limited among contractors. The objective of this study is to review the current scheduling process of construction in light of BIM...... and communicate. Scheduling on the detailed level, on the other hand, follows a stipulated approach to scheduling, i.e. the Last Planner System (LPS), which is characterized by involvement of all actors in the construction phase. Thus, the major challenge when implementing BIM-based scheduling is to improve...

  3. PRACTICAL IMPLICATIONS OF LOCATION-BASED SCHEDULING

    DEFF Research Database (Denmark)

    Andersson, Niclas; Christensen, Knud

    2007-01-01

    The traditional method for planning, scheduling and controlling activities and resources in construction projects is the CPM-scheduling, which has been the predominant scheduling method since its introduction in the late 1950s. Over the years, CPM has proven to be a very powerful technique...... that will be used in this study. LBS is a scheduling method that rests upon the theories of line-of-balance and which uses the graphic representation of a flowline chart. As such, LBS is adapted for planning and management of workflows and, thus, may provide a solution to the identified shortcomings of CPM. Even...

  4. Continuity-Aware Scheduling Algorithm for Scalable Video Streaming

    Directory of Open Access Journals (Sweden)

    Atinat Palawan

    2016-05-01

    Full Text Available The consumer demand for retrieving and delivering visual content through consumer electronic devices has increased rapidly in recent years. The quality of video in packet networks is susceptible to certain traffic characteristics: average bandwidth availability, loss, delay and delay variation (jitter. This paper presents a scheduling algorithm that modifies the stream of scalable video to combat jitter. The algorithm provides unequal look-ahead by safeguarding the base layer (without the need for overhead of the scalable video. The results of the experiments show that our scheduling algorithm reduces the number of frames with a violated deadline and significantly improves the continuity of the video stream without compromising the average Y Peek Signal-to-Noise Ratio (PSNR.

  5. Optimal Residential Load Scheduling Under Utility and Rooftop Photovoltaic Units

    Directory of Open Access Journals (Sweden)

    Ghulam Hafeez

    2018-03-01

    Full Text Available With the rapid advancement in technology, electrical energy consumption is increasing rapidly. Especially, in the residential sector, more than 80% of electrical energy is being consumed because of consumer negligence. This brings the challenging task of maintaining the balance between the demand and supply of electric power. In this paper, we focus on the problem of load balancing via load scheduling under utility and rooftop photovoltaic (PV units to reduce electricity cost and peak to average ratio (PAR in demand-side management. For this purpose, we adopted genetic algorithm (GA, binary particle swarm optimization (BPSO, wind-driven optimization (WDO, and our proposed genetic WDO (GWDO algorithm, which is a hybrid of GA and WDO, to schedule the household load. For energy cost estimation, combined real-time pricing (RTP and inclined block rate (IBR were used. The proposed algorithm shifts load from peak consumption hours to off-peak hours based on combined pricing scheme and generation from rooftop PV units. Simulation results validate our proposed GWDO algorithm in terms of electricity cost and PAR reduction while considering all three scenarios which we have considered in this work: (1 load scheduling without renewable energy sources (RESs and energy storage system (ESS, (2 load scheduling with RESs, and (3 load scheduling with RESs and ESS. Furthermore, our proposed scheme reduced electricity cost and PAR by 22.5% and 29.1% in scenario 1, 47.7% and 30% in scenario 2, and 49.2% and 35.4% in scenario 3, respectively, as compared to unscheduled electricity consumption.

  6. Quelle préposition ?

    CERN Document Server

    Grevisse, Maurice

    1996-01-01

    Pour bien parler ou bien écrire, il faut avant tout posséder un bon vocabulaire, puis savoir bien remuer les mots, leur faire exprimer quelque chose et agencer adroitement les propositions. Il faut aussi - et cela n'est pas négligeable - amener congrûment les divers compléments des noms, des adjectifs ou des verbes ; quand ces compléments sont de construction indirecte, c'est-à-dire quand ils doivent être introduits par une préposition, on hésite parfois sur la bonne manière de les accrocher. Ne pas négliger le bon choix! Cela ne crée pas le style, sans doute, mais peut, pour une part, témoigner de sa bonne qualité.

  7. Parimad suhtekorraldusteod konkursil Baltic PR Awards

    Index Scriptorium Estoniae

    2012-01-01

    Balti riikide suhtekorraldusliidud koostöös Rahvusvahelise Avalike Suhete Assotsiatsiooniga (IPRA) korraldavad 2001. aastast iga aasta kommunikatsioonijuhtimisalast auhinnakonkurssi Baltic PR Awards

  8. Thermodynamic assessment of the Pr-Zn binary system

    International Nuclear Information System (INIS)

    Huang, X.M.; Liu, L.B.; Zhang, L.G.; Jia, B.R.; Jin, Z.P.; Zheng, F.

    2008-01-01

    On the basis of available experimental data of phase diagram and thermodynamic properties, the Pr-Zn binary system has been optimized using the CALPHAD approach. The phases, including liquid and bcc A 2(βPr) were treated as substitutional solutions, while the intermetallic compounds, including PrZn, PrZn 2 , PrZn 3 , Pr 3 Zn 11 , Pr 13 Zn 58 , Pr 3 Zn 22 , Pr 2 Zn 17 and PrZn 11 were modeled as stoichiometric compounds. As the result of optimization, a set of self-consistent thermodynamic parameters has been obtained, which can be used to reproduce the reported experimental data

  9. A phase I trial of PR-104, a pre-prodrug of the bioreductive prodrug PR-104A, given weekly to solid tumour patients

    International Nuclear Information System (INIS)

    McKeage, Mark J; Gu, Yongchuan; Wilson, William R; Hill, Andrew; Amies, Karen; Melink, Teresa J; Jameson, Michael B

    2011-01-01

    The phosphate ester PR-104 is rapidly converted in vivo to the alcohol PR-104A, a nitrogen mustard prodrug that is metabolised to hydroxylamine (PR-104H) and amine (PR-104M) DNA crosslinking agents by one-electron reductases in hypoxic cells and by aldo-keto reductase 1C3 independently of oxygen. In a previous phase I study using a q 3 week schedule of PR-104, the maximum tolerated dose (MTD) was 1100 mg/m 2 and fatigue, neutropenic fever and infection were dose-limiting. The primary objective of the current study was to determine the dose-limiting toxicity (DLT) and MTD of weekly PR-104. Patients with advanced solid tumours received PR-104 as a 1-hour intravenous infusion on days 1, 8 and 15 every 28 days with assessment of pharmacokinetics on cycle 1 day 1. Twenty-six patients (pts) were enrolled (16 male/10 female; median age 58 yrs, range 30 to 70 yrs) who had received a median of two prior chemotherapy regimens (range, 0 to 3) for melanoma (8 pts), colorectal or anal cancer (3 pts), NSCLC (3 pts), sarcoma (3 pts), glioblastoma (2 pts), salivary gland tumours (2 pts) or other solid tumours (5 pts). PR-104 was administered at 135 mg/m 2 (3 pts), 270 mg/m 2 (6 pts), 540 mg/m 2 (6 pts), 675 mg/m 2 (7 pts) and 900 mg/m 2 (4 pts) for a median of two treatment cycles (range, 1 to 7 cycles) and five infusions (range, 1 to 18) per patient. Dose-limiting toxicities (DLTs) during cycle one included grade four thrombocytopenia at 540 mg/m 2 (1 of 6 pts) and grade four thrombocytopenia and neutropenia at 900 mg/m 2 (2 of 4 pts). At an intermediate dose of 675 mg/m 2 , there were no DLTs among a total of seven patients given 12 treatment cycles but all experienced moderate to severe (grade 2 to 4) haematological toxicity. Thrombocytopenia was delayed in its onset and nadir, and its recovery was protracted and incomplete in many patients. There were no complete or partial tumour responses. PR-104-induced thrombocytopenia and neutropenia correlated with plasma AUC of PR-104

  10. 29 CFR 825.203 - Scheduling of intermittent or reduced schedule leave.

    Science.gov (United States)

    2010-07-01

    ... leave intermittently or on a reduced leave schedule for planned medical treatment, then the employee... 29 Labor 3 2010-07-01 2010-07-01 false Scheduling of intermittent or reduced schedule leave. 825... OF LABOR OTHER LAWS THE FAMILY AND MEDICAL LEAVE ACT OF 1993 Employee Leave Entitlements Under the...

  11. Designing cyclic appointment schedules for outpatient clinics with scheduled and unscheduled patient arrivals

    NARCIS (Netherlands)

    Kortbeek, Nikky; Zonderland, Maartje E.; Braaksma, Aleida; Vliegen, Ingrid M. H.; Boucherie, Richard J.; Litvak, Nelly; Hans, Erwin W.

    2014-01-01

    We present a methodology to design appointment systems for outpatient clinics and diagnostic facilities that offer both walk-in and scheduled service. The developed blueprint for the appointment schedule prescribes the number of appointments to plan per day and the moment on the day to schedule the

  12. Designing cyclic appointment schedules for outpatient clinics with scheduled and unscheduled patient arrivals

    NARCIS (Netherlands)

    Kortbeek, Nikky; Zonderland, Maartje Elisabeth; Boucherie, Richardus J.; Litvak, Nelli; Hans, Elias W.

    2011-01-01

    We present a methodology to design appointment systems for outpatient clinics and diagnostic facilities that offer both walk-in and scheduled service. The developed blueprint for the appointment schedule prescribes the number of appointments to plan per day and the moment on the day to schedule the

  13. Accelerating exact schedulability analysis for fixed-priority pre-emptive scheduling

    NARCIS (Netherlands)

    Hang, Y.; Jiale, Z.; Keskin, U.; Bril, R.J.

    2010-01-01

    The schedulability analysis for fixed-priority preemptive scheduling (FPPS) plays a significant role in the real-time systems domain. The so-called Hyperplanes Exact Test (HET) [1] is an example of an exact schedulability test for FPPS. In this paper, we aim at improving the efficiency of HET by

  14. Difference and ratio plots

    DEFF Research Database (Denmark)

    Svendsen, Anders Jørgen; Holmskov, U; Bro, Peter

    1995-01-01

    and systemic lupus erythematosus from another previously published study (Macanovic, M. and Lachmann, P.J. (1979) Clin. Exp. Immunol. 38, 274) are also represented using ratio plots. Our observations indicate that analysis by regression analysis may often be misleading....... hitherto unnoted differences between controls and patients with either rheumatoid arthritis or systemic lupus erythematosus. For this we use simple, but unconventional, graphic representations of the data, based on difference plots and ratio plots. Differences between patients with Burkitt's lymphoma...

  15. A dynamic approach to vehicle scheduling

    NARCIS (Netherlands)

    D. Huisman (Dennis); R. Freling (Richard); A.P.M. Wagelmans (Albert)

    2001-01-01

    textabstractThis paper presents a dynamic approach to the vehicle scheduling problem. We discuss the potential benefit of our approach compared to the traditional one, where the vehicle scheduling problem is solved only once for a whole period and the travel times are assumed to be fixed. In our

  16. State Teacher Salary Schedules. Policy Analysis

    Science.gov (United States)

    Griffith, Michael

    2016-01-01

    In the United States most teacher compensation issues are decided at the school district level. However, a group of states have chosen to play a role in teacher pay decisions by instituting statewide teacher salary schedules. Education Commission of the States has found that 17 states currently make use of teacher salary schedules. This education…

  17. Evolutionary Scheduler for the Deep Space Network

    Science.gov (United States)

    Guillaume, Alexandre; Lee, Seungwon; Wang, Yeou-Fang; Zheng, Hua; Chau, Savio; Tung, Yu-Wen; Terrile, Richard J.; Hovden, Robert

    2010-01-01

    A computer program assists human schedulers in satisfying, to the maximum extent possible, competing demands from multiple spacecraft missions for utilization of the transmitting/receiving Earth stations of NASA s Deep Space Network. The program embodies a concept of optimal scheduling to attain multiple objectives in the presence of multiple constraints.

  18. Decay-usage scheduling in multiprocessors

    NARCIS (Netherlands)

    Epema, D.H.J.

    1998-01-01

    Decay-usage scheduling is a priority-aging time-sharing scheduling policy capable of dealing with a workload of both interactive and batch jobs by decreasing the priority of a job when it acquires CPU time, and by increasing its priority when it does not use the (a) CPU. In this article we deal with

  19. 5 CFR 950.801 - Campaign schedule.

    Science.gov (United States)

    2010-01-01

    ... 5 Administrative Personnel 2 2010-01-01 2010-01-01 false Campaign schedule. 950.801 Section 950... VOLUNTARY ORGANIZATIONS CFC Timetable § 950.801 Campaign schedule. (a) The Combined Federal Campaign will be.../International and International parts of the Charity List to all local campaigns by a date to be determined by...

  20. 46 CFR 525.2 - Terminal schedules.

    Science.gov (United States)

    2010-10-01

    ... domestic law and international conventions and agreements adopted by the United States; such terminal... their own negligence, or that impose upon others the obligation to indemnify or hold-harmless the terminals from liability for their own negligence. (2) Enforcement of terminal schedules. Any schedule that...

  1. 21 CFR 1308.13 - Schedule III.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 9 2010-04-01 2010-04-01 false Schedule III. 1308.13 Section 1308.13 Food and... opposite it. (b) Stimulants. Unless specifically excepted or unless listed in another schedule, any... a stimulant effect on the central nervous sxstem, including its salts, isomers (whether optical...

  2. Management Matters. Changing to Flexible Scheduling

    Science.gov (United States)

    Pappas, Marjorie L.

    2005-01-01

    Elementary school library media specialists state that one of the most frustrating issues they face is the fixed schedules in their library media centers. Beyond the cost effectiveness issue, the fixed schedule severely limits using the resources of the library media center for inquiry learning and collaborative teaching experiences between the…

  3. Agent-based scheduling for aircraft deicing

    NARCIS (Netherlands)

    Mao, X.; Ter Mors, A.W.; Roos, N.; Witteveen, C.

    2006-01-01

    The planning and scheduling of the deicing and anti-icing activities is an important and challenging part of airport departure planning. Deicing planning has to be done in a highly dynamic environment involving several autonomous and self-interested parties. Traditional centralized scheduling

  4. Robust scheduling in an uncertain environment

    NARCIS (Netherlands)

    Wilson, M.

    2016-01-01

    This thesis presents research on scheduling in an uncertain environment, which forms a part of the rolling stock life cycle logistics applied research and development program funded by Dutch railway industry companies. The focus therefore lies on scheduling of maintenance operations on rolling stock

  5. TECHNICAL COORDINATION, SCHEDULE AND INTEGRATION

    CERN Multimedia

    A. Ball

    Introduction and Schedule After nearly seven months of concentrated effort, the installation of services on YB0 moved off the CMS critical path in late November. In line with v36 planning provisions, the additional time needed to finish this challeng¬ing task was accommodated by reducing sequential dependencies between assembly tasks, putting more tasks (especially heavy logistic movements) in parallel with activities on, or within, the central wheel. Thus the lowering of wheels YB-1 and YB -2 and of disk YE-3 is already complete, the latter made possible, in the shadow of YB0 work, by inverting the order of the 3 endcap disks in the surface building. Weather conditions permitting, the Tracker will be transported to point 5 during CMS week for insertion in EB before CERN closes. The lowering of the last two disks will take place mid- and end-of January, respectively. Thus central beampipe installation can be confidently planned to start in February as foreseen, allowing closure of CMS in time for CRA...

  6. TECHNICAL COORDINATION, SCHEDULE AND INTEGRATION

    CERN Multimedia

    A. Ball

    Introduction Despite the holiday season affecting available manpower, many key internal milestones have been passed over the summer, thanks to the dedication and commitment of the team at point 5. In particular, the installation on, and within, YB0 has progressed steadily through several potentially difficult phases. The v36 planning contingency of lowering YB-1 and YB-1 wheels on schedule in October, before Tracker installation, will be executed in order to give more time to complete YB0 services work, whilst still being consistent with completion of heavy lowering by the end of 2007. Safety In the underground areas the peak level of activity and parallel work has been reached and this will continue for the coming months. Utmost vigilance is required of everybody working underground and this must be maintained. However, it is encouraging to note that the compliance with safety rules is, in general, good. More and more work will be carried out from scaffolding and mobile access platforms. (cherry-picke...

  7. Scheduling mammograms for asymptomatic women

    International Nuclear Information System (INIS)

    Gohagan, J.K.; Darby, W.P.; Spitznagel, E.L.; Tome, A.E.

    1988-01-01

    A decision theoretic model was used to investigate the relative importance of risk level, radiation hazard, mammographic accuracy, and cost in mammographic screening decision. The model uses woman-specific medical and family history facts and clinic-specific information regarding mammographic accuracy and practice to profile both woman and clinic, and to formulate periodic screening recommendations. Model parameters were varied extensively to investigate the sensitivity of screening schedules to input values. Multivariate risk was estimated within the program using published data from the Breast Cancer Detection Demonstration Project 5-year follow-up study. Radiation hazard estimates were developed from published radiation physics and radioepidemiologic risk data. Benchmark values for mammographic sensitivity and specificity under screening conditions were calculated from Breast Cancer Detection Demonstration Project data. Procedural costs used in the analysis were varied around values reflecting conditions at the Washington University Medical Center. Mortality advantages of early versus late breast cancer detection were accounted for using Health Insurance Plan of New York case survival rates. Results are compared with published screening policies to provide insight into implicit assumptions behind those policies. This analysis emphasizes the importance of accounting for variations in clinical accuracy under screening circumstances, in costs, in radiation exposure, and in woman-specific risk when recommending mammographic screening

  8. TECHNICAL COORDINATION, SCHEDULE AND INTEGRATION

    CERN Multimedia

    A. Ball

    Introduction Since the lowering of YB0 in February, less spectacular but nonetheless crucial progress has been made along the critical path to CMS completion. The YB0 has been aligned with the beamline to a fraction of a mm, and the HCAL has been fully installed. Cabling scaffolding for YB0 services has been built and one half (-z end) of the ECAL barrel has been installed. The YB0 services installation has begun, with two of the major technical challenges delaying bulk installation, namely PP1 detailed design, manufacture and installation plus Tracker cooling pipe insulation, now apparently solved. Significant difficulties in detailed design, integration and procurement of cable ducts remain. Despite this, the design of the +end is close to complete, and Tracker power cable installation on two sectors of the +end is well advanced. A new master schedule, v36.0, is being prepared to account for the updated actual situation at point 5 and for the revised LHC machine planning. Safety The enormous amount of...

  9. Scheduling nursing personnel on a microcomputer.

    Science.gov (United States)

    Liao, C J; Kao, C Y

    1997-01-01

    Suggests that with the shortage of nursing personnel, hospital administrators have to pay more attention to the needs of nurses to retain and recruit them. Also asserts that improving nurses' schedules is one of the most economic ways for the hospital administration to create a better working environment for nurses. Develops an algorithm for scheduling nursing personnel. Contrary to the current hospital approach, which schedules nurses on a person-by-person basis, the proposed algorithm constructs schedules on a day-by-day basis. The algorithm has inherent flexibility in handling a variety of possible constraints and goals, similar to other non-cyclical approaches. But, unlike most other non-cyclical approaches, it can also generate a quality schedule in a short time on a microcomputer. The algorithm was coded in C language and run on a microcomputer. The developed software is currently implemented at a leading hospital in Taiwan. The response to the initial implementation is quite promising.

  10. NASA Instrument Cost/Schedule Model

    Science.gov (United States)

    Habib-Agahi, Hamid; Mrozinski, Joe; Fox, George

    2011-01-01

    NASA's Office of Independent Program and Cost Evaluation (IPCE) has established a number of initiatives to improve its cost and schedule estimating capabilities. 12One of these initiatives has resulted in the JPL developed NASA Instrument Cost Model. NICM is a cost and schedule estimator that contains: A system level cost estimation tool; a subsystem level cost estimation tool; a database of cost and technical parameters of over 140 previously flown remote sensing and in-situ instruments; a schedule estimator; a set of rules to estimate cost and schedule by life cycle phases (B/C/D); and a novel tool for developing joint probability distributions for cost and schedule risk (Joint Confidence Level (JCL)). This paper describes the development and use of NICM, including the data normalization processes, data mining methods (cluster analysis, principal components analysis, regression analysis and bootstrap cross validation), the estimating equations themselves and a demonstration of the NICM tool suite.

  11. The influence of "preparedness" on autoshaping, schedule performance, and choice.

    Science.gov (United States)

    Burns, J D; Malone, J C

    1992-11-01

    Two groups of experimentally naive pigeons were exposed to an autoshaping procedure in which the response key was mounted on the wall (the conventional location) or on the floor of the chamber. In two experiments, subjects readily responded to the wall key, but floor-key subjects required shaping. A subsequent experiment compared performance of wall- and floor-key groups on an ascending series of fixed-ratio schedule values, resistance to extinction, differential reinforcement of other behavior, and reversal of key assignment. Each experiment was followed by several sessions of fixed-ratio training; the performance of the wall- and floor-key groups was almost identical throughout. In the final experiment, a fixed-ratio requirement could be completed on either or both keys. Birds initially chose the key on which they had responded during the preceding (reversal of key assignment) experiment. However, within a few sessions both groups showed almost exclusive preference for the floor key. Preference for a key located on the floor may follow from the fact that pigeons are ground feeders and may thus be more "prepared" to peck the floor than to peck a wall. However, autoshaping, under the conditions prevailing here, occurred much more readily to the wall key, suggesting that pecking a vertical surface is more highly prepared. Difficulties in determining relative preparedness seem moot, however, given the lack of between-group differences in the intervening experiments. It is thus unlikely that schedule performances critically depend upon the specific operant response involved.

  12. Routine environmental monitoring schedule, calendar year 1997

    Energy Technology Data Exchange (ETDEWEB)

    Markes, B.M., Westinghouse Hanford

    1996-12-10

    This document provides the Environmental Restorations Contractor (ERC) and the Project Hanford Management Contractor.(PHMC) a schedule in accordance with the WHC-CM-7-5, Environmental Compliance` and BHI- EE-02, Environmental Requirements, of monitoring and sampling routines for the Near-Field Monitoring (NFM) program during calendar year (CY) 1997. Every attempt will be made to consistently follow this schedule; any deviation from this schedule will be documented by an internal memorandum (DSI) explaining the reason for the deviation. The DSI will be issued by the scheduled performing organization and directed to Near-Field Monitoring. The survey frequencies for particular sites are determined by the technical judgment of Near- Field Monitoring and may depend on the site history, radiological status, use, and general conditions. Additional surveys may be requested at irregular frequencies if conditions warrant. All radioactive wastes sites are scheduled to be surveyed at least annually. Any newly discovered wastes sites not documented by this schedule will be included in the revised schedule for CY 1998. The outside perimeter road surveys of 200 East and West Area and the rail survey from the 300 Area to Columbia Center will be performed in the year 2000 per agreement with Department of Energy. Richland Field Office. This schedule does not discuss staffing needs, nor does it list the monitoring equipment to be used in completing specific routines. Personnel performing routines to meet this schedule shall communicate any need for assistance in completing these routines to Radiological Control management and Near-Field Monitoring. After each routine survey is completed, a copy of the survey record, maps, and data sheets will be forwarded to Near-Field Monitoring. These routine surveys will not be considered complete until this documentation is received. At the end of each month, the ERC and PHMC radiological control organizations shall forward a copy of the Routine

  13. PrP Conformational Transitions Alter Species Preference of a PrP-specific antibody

    NARCIS (Netherlands)

    Zou, W.Q.; Langeveld, J.P.M.; Xiao, X.; Chen, S.; McGeer, P.L.; Yuan, J.; Payne, M.C.; Kang, H.E.; McGeehan, J.M.; Sy, M.S.; Greenspan, N.S.; Kaplan, D.; Wang, G.X.; Parchi, P.; Hoover, E.A.; Kneale, G.; Telling, G.; Surewicz, W.; Kong, Q.; Guo, J.

    2010-01-01

    The epitope of the 3F4 antibody most commonly used in human prion disease diagnosis is believed to consist of residues Met-Lys-His-Met (MKHM) corresponding to human PrP-(109–112). This assumption is based mainly on the observation that 3F4 reacts with human and hamster PrP but not with PrP from

  14. Suured prügifirmad valmistuvad prügipuuduseks / Mirko Ojakivi

    Index Scriptorium Estoniae

    Ojakivi, Mirko

    2010-01-01

    Ragn-Sells ja Adelan Prügiveod soovivad luba jäätmete pikaajaliseks vaheladestamiseks Tallinna piiril. Ragn-Sells saaks jäätmekütusetehase planeerimise ja ehitamise ajal endale koguda ligi 35 000 t segaolmejäätmeid aastas, Adelan Prügiveod sooviks ladestada ligi 50 000 t prügi aastas

  15. Role of the pharmacist in pre-exposure chemoprophylaxis (PrEP therapy for HIV prevention

    Directory of Open Access Journals (Sweden)

    Clauson KA

    2009-03-01

    Full Text Available With a global estimate of 2.5 million new infections of HIV occurring yearly, discovering novel methods to help stem the spread of the virus is critical. The use of antiretroviral chemoprophylaxis for preventing HIV after accidental or occupational exposure and in maternal to fetal transmission has become a widely accepted method to combat HIV. Based on this success, pre-exposure chemoprophylaxis (PrEP is being explored in at-risk patient populations such as injecting drug users, female sex workers and men who have sex with men. This off-label and unmonitored use has created a need for education and intervention by pharmacists and other healthcare professionals. Pharmacists should educate themselves on PrEP and be prepared to counsel patients about their means of obtaining it (e.g. borrowing or sharing medications and ordering from disreputable Internet pharmacies. They should also be proactive about medication therapy management in these patients due to clinically important drug interactions with PrEP medications. Only one trial exploring the safety and efficacy of tenofovir as PrEP has been completed thus far. However, five ongoing trials are in various stages and two additional studies are scheduled for the near future. Unfortunately, studies in this arena have met with many challenges that have threatened to derail progress. Ethical controversy surrounding post-trial care of participants who seroconvert during studies, as well as concerns over emerging viral resistance and logistical site problems, have already halted several PrEP trials. Information about these early trials has already filtered down to affected individuals who are experimenting with this unproven therapy as an “evening before pill”. The potential for PrEP is promising; however, more extensive trials are necessary to establish its safety and efficacy. Pharmacists are well-positioned to play a key role in helping patients make choices about PrEP, managing their therapy

  16. Integrated Fractional Load and Packet Scheduling for OFDMA Systems

    DEFF Research Database (Denmark)

    Monghal, Guillaume Damien; Kumar, S.; Pedersen, Klaus I.

    2009-01-01

    This paper study the performance of an orthogonal frequency division multiple access (OFDMA) system under fractional load based in long term evolution (LTE) downlink. Fractional load is defined by a situation where only a fraction of the bandwidth is used for transmission due to lack of traffic....... This type of situation should result in a global increase of signal to interference and noise ratio (SINR) conditions in the network. We propose different methods integrating the transmission pattern selection to the packet scheduling functionality of the enode-B depending only on the channel quality...

  17. The comparison of predictive scheduling algorithms for different sizes of job shop scheduling problems

    Science.gov (United States)

    Paprocka, I.; Kempa, W. M.; Grabowik, C.; Kalinowski, K.; Krenczyk, D.

    2016-08-01

    In the paper a survey of predictive and reactive scheduling methods is done in order to evaluate how the ability of prediction of reliability characteristics influences over robustness criteria. The most important reliability characteristics are: Mean Time to Failure, Mean Time of Repair. Survey analysis is done for a job shop scheduling problem. The paper answers the question: what method generates robust schedules in the case of a bottleneck failure occurrence before, at the beginning of planned maintenance actions or after planned maintenance actions? Efficiency of predictive schedules is evaluated using criteria: makespan, total tardiness, flow time, idle time. Efficiency of reactive schedules is evaluated using: solution robustness criterion and quality robustness criterion. This paper is the continuation of the research conducted in the paper [1], where the survey of predictive and reactive scheduling methods is done only for small size scheduling problems.

  18. Electrocardiographic PR prolongation and atrial fibrillation risk: a meta-analysis of prospective cohort studies.

    Science.gov (United States)

    Cheng, Min; Lu, Xiangfeng; Huang, Jianfeng; Zhang, Shu; Gu, Dongfeng

    2015-01-01

    Electrocardiographic PR interval prolongation is considered a benign condition, but recent studies have challenged the notion by demonstrating that prolonged PR interval is associated with an increased risk of atrial fibrillation (AF). The purpose of this study was to perform a meta-analysis of prospective cohort studies to evaluate the evidence supporting an association of prolonged PR interval with AF incidence. We searched the MEDLINE and EMBASE database (from inception to May 2014) supplemented by manual searches of references of relevant retrieved articles. Prospective cohort studies were included with hazard ratio (HR) of prolonged PR interval for incident AF. The search strategy yielded 6 cohort studies meeting eligibility criteria. A total of 328,932 participants were included, with 14,191 participants suffering from AF during follow-up. Pooled HRs of prolonged PR interval for incident AF was 1.30 (95% CI: 1.13 to 1.49) using random-effect model (I(2) = 30%). There was a significant difference of combined HRs between studies with and without adjustment for taking of AV nodal blocking agents in subgroup analysis. Sensitivity analysis supported the robustness of the results. Prolonged PR interval is not a totally benign condition but an independent risk factor for AF incidence. The mechanisms underlying the association of prolonged PR interval with AF incidence need further research. © 2014 Wiley Periodicals, Inc.

  19. Timing analysis for embedded systems using non-preemptive EDF scheduling under bounded error arrivals

    Directory of Open Access Journals (Sweden)

    Michael Short

    2017-07-01

    Full Text Available Embedded systems consist of one or more processing units which are completely encapsulated by the devices under their control, and they often have stringent timing constraints associated with their functional specification. Previous research has considered the performance of different types of task scheduling algorithm and developed associated timing analysis techniques for such systems. Although preemptive scheduling techniques have traditionally been favored, rapid increases in processor speeds combined with improved insights into the behavior of non-preemptive scheduling techniques have seen an increased interest in their use for real-time applications such as multimedia, automation and control. However when non-preemptive scheduling techniques are employed there is a potential lack of error confinement should any timing errors occur in individual software tasks. In this paper, the focus is upon adding fault tolerance in systems using non-preemptive deadline-driven scheduling. Schedulability conditions are derived for fault-tolerant periodic and sporadic task sets experiencing bounded error arrivals under non-preemptive deadline scheduling. A timing analysis algorithm is presented based upon these conditions and its run-time properties are studied. Computational experiments show it to be highly efficient in terms of run-time complexity and competitive ratio when compared to previous approaches.

  20. Clinch River Breeder Reactor Plant Project: construction schedule

    International Nuclear Information System (INIS)

    Purcell, W.J.; Martin, E.M.; Shivley, J.M.

    1982-01-01

    The construction schedule for the Clinch River Breeder Reactor Plant and its evolution are described. The initial schedule basis, changes necessitated by the evaluation of the overall plant design, and constructability improvements that have been effected to assure adherence to the schedule are presented. The schedule structure and hierarchy are discussed, as are tools used to define, develop, and evaluate the schedule

  1. NRC comprehensive records disposition schedule. Revision 3

    International Nuclear Information System (INIS)

    1998-02-01

    Title 44 US Code, ''Public Printing and Documents,'' regulations issued by the General Service Administration (GSA) in 41 CFR Chapter 101, Subchapter B, ''Management and Use of Information and Records,'' and regulations issued by the National Archives and Records Administration (NARA) in 36 CFR Chapter 12, Subchapter B, ''Records Management,'' require each agency to prepare and issue a comprehensive records disposition schedule that contains the NARA approved records disposition schedules for records unique to the agency and contains the NARA's General Records Schedules for records common to several or all agencies. The approved records disposition schedules specify the appropriate duration of retention and the final disposition for records created or maintained by the NRC. NUREG-0910, Rev. 3, contains ''NRC's Comprehensive Records Disposition Schedule,'' and the original authorized approved citation numbers issued by NARA. Rev. 3 incorporates NARA approved changes and additions to the NRC schedules that have been implemented since the last revision dated March, 1992, reflects recent organizational changes implemented at the NRC, and includes the latest version of NARA's General Records Schedule (dated August 1995)

  2. Schedule-Aware Workflow Management Systems

    Science.gov (United States)

    Mans, Ronny S.; Russell, Nick C.; van der Aalst, Wil M. P.; Moleman, Arnold J.; Bakker, Piet J. M.

    Contemporary workflow management systems offer work-items to users through specific work-lists. Users select the work-items they will perform without having a specific schedule in mind. However, in many environments work needs to be scheduled and performed at particular times. For example, in hospitals many work-items are linked to appointments, e.g., a doctor cannot perform surgery without reserving an operating theater and making sure that the patient is present. One of the problems when applying workflow technology in such domains is the lack of calendar-based scheduling support. In this paper, we present an approach that supports the seamless integration of unscheduled (flow) and scheduled (schedule) tasks. Using CPN Tools we have developed a specification and simulation model for schedule-aware workflow management systems. Based on this a system has been realized that uses YAWL, Microsoft Exchange Server 2007, Outlook, and a dedicated scheduling service. The approach is illustrated using a real-life case study at the AMC hospital in the Netherlands. In addition, we elaborate on the experiences obtained when developing and implementing a system of this scale using formal techniques.

  3. Mission Operations Planning and Scheduling System (MOPSS)

    Science.gov (United States)

    Wood, Terri; Hempel, Paul

    2011-01-01

    MOPSS is a generic framework that can be configured on the fly to support a wide range of planning and scheduling applications. It is currently used to support seven missions at Goddard Space Flight Center (GSFC) in roles that include science planning, mission planning, and real-time control. Prior to MOPSS, each spacecraft project built its own planning and scheduling capability to plan satellite activities and communications and to create the commands to be uplinked to the spacecraft. This approach required creating a data repository for storing planning and scheduling information, building user interfaces to display data, generating needed scheduling algorithms, and implementing customized external interfaces. Complex scheduling problems that involved reacting to multiple variable situations were analyzed manually. Operators then used the results to add commands to the schedule. Each architecture was unique to specific satellite requirements. MOPSS is an expert system that automates mission operations and frees the flight operations team to concentrate on critical activities. It is easily reconfigured by the flight operations team as the mission evolves. The heart of the system is a custom object-oriented data layer mapped onto an Oracle relational database. The combination of these two technologies allows a user or system engineer to capture any type of scheduling or planning data in the system's generic data storage via a GUI.

  4. Scheduling multimedia services in cloud computing environment

    Science.gov (United States)

    Liu, Yunchang; Li, Chunlin; Luo, Youlong; Shao, Yanling; Zhang, Jing

    2018-02-01

    Currently, security is a critical factor for multimedia services running in the cloud computing environment. As an effective mechanism, trust can improve security level and mitigate attacks within cloud computing environments. Unfortunately, existing scheduling strategy for multimedia service in the cloud computing environment do not integrate trust mechanism when making scheduling decisions. In this paper, we propose a scheduling scheme for multimedia services in multi clouds. At first, a novel scheduling architecture is presented. Then, We build a trust model including both subjective trust and objective trust to evaluate the trust degree of multimedia service providers. By employing Bayesian theory, the subjective trust degree between multimedia service providers and users is obtained. According to the attributes of QoS, the objective trust degree of multimedia service providers is calculated. Finally, a scheduling algorithm integrating trust of entities is proposed by considering the deadline, cost and trust requirements of multimedia services. The scheduling algorithm heuristically hunts for reasonable resource allocations and satisfies the requirement of trust and meets deadlines for the multimedia services. Detailed simulated experiments demonstrate the effectiveness and feasibility of the proposed trust scheduling scheme.

  5. MEDICAL STAFF SCHEDULING USING SIMULATED ANNEALING

    Directory of Open Access Journals (Sweden)

    Ladislav Rosocha

    2015-07-01

    Full Text Available Purpose: The efficiency of medical staff is a fundamental feature of healthcare facilities quality. Therefore the better implementation of their preferences into the scheduling problem might not only rise the work-life balance of doctors and nurses, but also may result into better patient care. This paper focuses on optimization of medical staff preferences considering the scheduling problem.Methodology/Approach: We propose a medical staff scheduling algorithm based on simulated annealing, a well-known method from statistical thermodynamics. We define hard constraints, which are linked to legal and working regulations, and minimize the violations of soft constraints, which are related to the quality of work, psychic, and work-life balance of staff.Findings: On a sample of 60 physicians and nurses from gynecology department we generated monthly schedules and optimized their preferences in terms of soft constraints. Our results indicate that the final value of objective function optimized by proposed algorithm is more than 18-times better in violations of soft constraints than initially generated random schedule that satisfied hard constraints.Research Limitation/implication: Even though the global optimality of final outcome is not guaranteed, desirable solutionwas obtained in reasonable time. Originality/Value of paper: We show that designed algorithm is able to successfully generate schedules regarding hard and soft constraints. Moreover, presented method is significantly faster than standard schedule generation and is able to effectively reschedule due to the local neighborhood search characteristics of simulated annealing.

  6. Scheduling nurses’ shifts at PGI Cikini Hospital

    Science.gov (United States)

    Nainggolan, J. C. T.; Kusumastuti, R. D.

    2018-03-01

    Hospitals play an essential role in the community by providing medical services to the public. In order to provide high quality medical services, hospitals must manage their resources (including nurses) effectively and efficiently. Scheduling of nurses’ work shifts, in particular, is crucial, and must be conducted carefully to ensure availability and fairness. This research discusses the job scheduling system for nurses in PGI Cikini Hospital, Jakarta with Goal Programming approach. The research objectives are to identify nurse scheduling criteria and find the best schedule that can meet the criteria. The model has hospital regulations (including government regulations) as hard constraints, and nurses’ preferences as soft constraints. We gather primary data (hospital regulations and nurses’ preferences) through interviews with three Head Nurses and distributing questionnaires to fifty nurses. The results show that on the best schedule, all hard constraints can be satisfied. However, only two out of four soft constraints are satisfied. Compared to current scheduling practice, the resulting schedule ensures the availability of nurses as it satisfies all hospital’s regulations and it has a higher level of fairness as it can accommodate some of the nurses’ preferences.

  7. PROMSYS, Plant Equipment Maintenance and Inspection Scheduling

    International Nuclear Information System (INIS)

    Morgan, D.L.; Srite, B.E.

    1986-01-01

    1 - Description of problem or function: PROMSYS is a computer system designed to automate the scheduling of routine maintenance and inspection of plant equipment. This 'programmed maintenance' provides the detailed planning and accomplishment of lubrication, inspection, and similar repetitive maintenance activities which can be scheduled at specified predetermined intervals throughout the year. The equipment items included are the typical pumps, blowers, motors, compressors, automotive equipment, refrigeration units, filtering systems, machine shop equipment, cranes, elevators, motor-generator sets, and electrical switchgear found throughout industry, as well as cell ventilation, shielding, containment, and material handling equipment unique to nuclear research and development facilities. Four related programs are used to produce sorted schedule lists, delinquent work lists, and optional master lists. Five additional programs are used to create and maintain records of all scheduled and unscheduled maintenance history. 2 - Method of solution: Service specifications and frequency are established and stored. The computer program reviews schedules weekly and prints, on schedule cards, instructions for service that is due the following week. The basic output from the computer program comes in two forms: programmed-maintenance schedule cards and programmed-maintenance data sheets. The data sheets can be issued in numerical building, route, and location number sequence as equipment lists, grouped for work assigned to a particular foreman as the foreman's equipment list, or grouped by work charged to a particular work order as the work-order list. Data sheets grouped by equipment classification are called the equipment classification list

  8. NRC comprehensive records disposition schedule. Revision 3

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-02-01

    Title 44 US Code, ``Public Printing and Documents,`` regulations issued by the General Service Administration (GSA) in 41 CFR Chapter 101, Subchapter B, ``Management and Use of Information and Records,`` and regulations issued by the National Archives and Records Administration (NARA) in 36 CFR Chapter 12, Subchapter B, ``Records Management,`` require each agency to prepare and issue a comprehensive records disposition schedule that contains the NARA approved records disposition schedules for records unique to the agency and contains the NARA`s General Records Schedules for records common to several or all agencies. The approved records disposition schedules specify the appropriate duration of retention and the final disposition for records created or maintained by the NRC. NUREG-0910, Rev. 3, contains ``NRC`s Comprehensive Records Disposition Schedule,`` and the original authorized approved citation numbers issued by NARA. Rev. 3 incorporates NARA approved changes and additions to the NRC schedules that have been implemented since the last revision dated March, 1992, reflects recent organizational changes implemented at the NRC, and includes the latest version of NARA`s General Records Schedule (dated August 1995).

  9. Behavioral effects of microwave reinforcement schedules and variations in microwave intensity on albino rats

    Energy Technology Data Exchange (ETDEWEB)

    Vitulli, W.F.; Lambert, J.K.; Brown, S.W.; Quinn, J.M.

    1987-12-01

    The objective of this exploratory investigation was to determine the interactive effects of fixed-ratio scheduling of microwave reinforcement in tandem with changes in microwave intensity. Nine albino rats were conditioned to regulate their thermal environment with microwave radiation while living in a Skinner (operant conditioning) Box in which the ambient temperature was about 27.13 degrees F at the beginning of the session. Each rat obtained a 6-sec. exposure of microwave radiation on a fixed-ratio schedule of MW reinforcement, the values of which varied from FR-1 to FR-30. Intensities of MW radiation were 62.5 W, 125 W, 250 W, and 437.5 W. Sessions lasted for 8 to 9 hr. over an approximate 13-mo. period. The effects of the intensity of microwave reinforcement varied as a function of the ratio value of the schedule used. Continuous reinforcement (FR-1) produced the lowest over-all rates, whereas FR-15, and FR-25 produced the highest over-all rates. Relatively higher thermal-behavior rates occurred under 62.5 W than under any of the other MW intensities for FR-1, FR-15, and FR-25, whereas FR-10 and FR-30 ratios produced intermediate rates of thermal responding which were constant for all values of MW intensity. These data are explained in terms of interactive effects between the local satiation or deprivation properties of the MW intensity and the ratio requirements of the schedule of MW reinforcement.

  10. PrEP (Pre-Exposure Prophylaxis) 101

    Science.gov (United States)

    ... than 70%. Your risk of getting HIV from sex can be even lower if you combine PrEP with condoms and other prevention methods. Download PrEP 101 Consumer Info Sheet Vital Signs Fact Sheet on Daily Pill Can Prevent HIV (PrEP) Expand All Collapse All Video Introductions to PrEP What is PrEP? A Brief ...

  11. Bridging the Gap Between Planning and Scheduling

    Science.gov (United States)

    Smith, David E.; Frank, Jeremy; Jonsson, Ari K.; Norvig, Peter (Technical Monitor)

    2000-01-01

    Planning research in Artificial Intelligence (AI) has often focused on problems where there are cascading levels of action choice and complex interactions between actions. In contrast. Scheduling research has focused on much larger problems where there is little action choice, but the resulting ordering problem is hard. In this paper, we give an overview of M planning and scheduling techniques, focusing on their similarities, differences, and limitations. We also argue that many difficult practical problems lie somewhere between planning and scheduling, and that neither area has the right set of tools for solving these vexing problems.

  12. The rectilinear Steiner ratio

    Directory of Open Access Journals (Sweden)

    PO de Wet

    2005-06-01

    Full Text Available The rectilinear Steiner ratio was shown to be 3/2 by Hwang [Hwang FK, 1976, On Steiner minimal trees with rectilinear distance, SIAM Journal on Applied Mathematics, 30, pp. 104– 114.]. We use continuity and introduce restricted point sets to obtain an alternative, short and self-contained proof of this result.

  13. Aspects of Pr3+ luminescence in solids

    International Nuclear Information System (INIS)

    Srivastava, A.M.

    2016-01-01

    A brief perspective on the influence of “host lattice-Pr 3+ ” interactions on the optical properties of the Pr 3+ ion in solids is presented. How the energy position of the Pr 3+ 4f 1 5d 1 configuration relative to the 1 S 0 , 3 P J and host lattice conduction band levels influences the Pr 3+ optical properties is highlighted by considering solids in which the 4f 1 5d 1 configuration (1) is energetically above the 1 S 0 level, (2) is energetically below the 1 S 0 level, (3) is energetically close to the 1 S 0 level, and (4) overlaps with the host lattice conduction band. - Highlights: • Spectroscopic properties of Pr 3+ in solids is examined. • The influence of Pr 3+ 4f 1 5d 1 energy position relative to the 4f 2 levels is discussed. • The effect of interaction between Pr 3+ 4f 1 5d 1 and host conduction level is illustrated. • The paper identifies potential commercial applications.

  14. Studies in the Crystalline Electric Field in Pr2 Al and Pr Al by the Inelastic Neutron Scattering Method

    International Nuclear Information System (INIS)

    Slisenko, V.I.; Ivanitskij, P.G.; Vasil'kevich, A.A.; Krotenko, V.T.; Majstrenko, A.N.

    1993-01-01

    Results of inelastic neutron scattering in polycrystalline Pr 2 Al and Pr Al are reported. The parameters of the crystal field Hamiltonian for the orthorhombic point symmetry of the Pr 3+ ions in Pr 2 Al and Pr Al are derived from neutron spectra. Using These parameters the magnetic contribution to the specific heat is calculated

  15. Efficient Academic Scheduling at the U.S. Naval Academy

    National Research Council Canada - National Science Library

    Zane, David

    2003-01-01

    This research project examined academic scheduling problems at the U.S. Naval Academy. The focus was on devising methods to construct good final exam schedules and improve existing course schedules by facilitation course changes...

  16. Efficient Load Scheduling Method For Power Management

    Directory of Open Access Journals (Sweden)

    Vijo M Joy

    2015-08-01

    Full Text Available An efficient load scheduling method to meet varying power supply needs is presented in this paper. At peak load times the power generation system fails due to its instability. Traditionally we use load shedding process. In load shedding process disconnect the unnecessary and extra loads. The proposed method overcomes this problem by scheduling the load based on the requirement. Artificial neural networks are used for this optimal load scheduling process. For generate economic scheduling artificial neural network has been used because generation of power from each source is economically different. In this the total load required is the inputs of this network and the power generation from each source and power losses at the time of transmission are the output of the neural network. Training and programming of the artificial neural networks are done using MATLAB.

  17. Quantify Risk to Manage Cost and Schedule

    National Research Council Canada - National Science Library

    Raymond, Fred

    1999-01-01

    Too many projects suffer from unachievable budget and schedule goals, caused by unrealistic estimates and the failure to quantify and communicate the uncertainty of these estimates to managers and sponsoring executives...

  18. Alternative Work Schedules Increase Employee Satisfaction.

    Science.gov (United States)

    Turney, John R.; Cohen, Stanley L.

    1983-01-01

    Facets of alternative work schedules (AWS) are discussed: importance of employee control, possible negative consequences, AWS handbook, time monitoring systems, and treatment of exceptions. AWS' effect on productivity and motivation is examined. (SK)

  19. The Composition of the Master Schedule

    Science.gov (United States)

    Thomas, Cynthia C.; Behrend, Dirk; MacMillan, Daniel S.

    2010-01-01

    Over a period of about four months, the IVS Coordinating Center (IVSCC) each year composes the Master Schedule for the IVS observing program of the next calendar year. The process begins in early July when the IVSCC contacts the IVS Network Stations to request information about available station time as well as holiday and maintenance schedules for the upcoming year. Going through various planning stages and a review process with the IVS Observing Program Committee (OPC), the final version of the Master Schedule is posted by early November. We describe the general steps of the composition and illustrate them with the example of the planning for the Master Schedule of the 2010 observing year.

  20. Nonblocking Scheduling for Web Service Transactions

    DEFF Research Database (Denmark)

    Alrifai, Mohammad; Balke, Wolf-Tilo; Dolog, Peter

    2007-01-01

    . In this paper, we propose a novel nonblocking scheduling mechanism that is used prior to the actual service invocations. Its aim is to reach an agreement between the client and all participating providers on what transaction processing times have to be expected, accepted, and guaranteed. This enables service......For improved flexibility and concurrent usage existing transaction management models for Web services relax the isolation property of Web service-based transactions. Correctness of the concurrent execution then has to be ensured by commit order-preserving transaction schedulers. However, local...... schedulers of service providers typically do take into account neither time constraints for committing the whole transaction, nor the individual services' constraints when scheduling decisions are made. This often leads to an unnecessary blocking of transactions by (possibly long-running) others...

  1. Schedule Sales Query Report Generation System

    Data.gov (United States)

    General Services Administration — Schedule Sales Query presents sales volume figures as reported to GSA by contractors. The reports are generated as quarterly reports for the current year and the...

  2. Knowledge-based scheduling of arrival aircraft

    Science.gov (United States)

    Krzeczowski, K.; Davis, T.; Erzberger, H.; Lev-Ram, I.; Bergh, C.

    1995-01-01

    A knowledge-based method for scheduling arrival aircraft in the terminal area has been implemented and tested in real-time simulation. The scheduling system automatically sequences, assigns landing times, and assigns runways to arrival aircraft by utilizing continuous updates of aircraft radar data and controller inputs. The scheduling algorithms is driven by a knowledge base which was obtained in over two thousand hours of controller-in-the-loop real-time simulation. The knowledge base contains a series of hierarchical 'rules' and decision logic that examines both performance criteria, such as delay reduction, as well as workload reduction criteria, such as conflict avoidance. The objective of the algorithms is to devise an efficient plan to land the aircraft in a manner acceptable to the air traffic controllers. This paper will describe the scheduling algorithms, give examples of their use, and present data regarding their potential benefits to the air traffic system.

  3. Scheduling Network Traffic for Grid Purposes

    DEFF Research Database (Denmark)

    Gamst, Mette

    This thesis concerns scheduling of network traffic in grid context. Grid computing consists of a number of geographically distributed computers, which work together for solving large problems. The computers are connected through a network. When scheduling job execution in grid computing, data...... transmission has so far not been taken into account. This causes stability problems, because data transmission takes time and thus causes delays to the execution plan. This thesis proposes the integration of job scheduling and network routing. The scientific contribution is based on methods from operations...... research and consists of six papers. The first four considers data transmission in grid context. The last two solves the data transmission problem, where the number of paths per data connection is bounded from above. The thesis shows that it is possible to solve the integrated job scheduling and network...

  4. Congruent Validity of the Rathus Assertiveness Schedule.

    Science.gov (United States)

    Harris, Thomas L.; Brown, Nina W.

    1979-01-01

    The validity of the Rathus Assertiveness Schedule (RAS) was investigated by correlating it with the six Class I scales of the California Psychological Inventory on a sample of undergraduate students. Results supported the validity of the RAS. (JKS)

  5. Cure Schedule for Stycast 2651/Catalyst 11.

    Energy Technology Data Exchange (ETDEWEB)

    Kropka, Jamie Michael [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); McCoy, John D. [New Mexico Inst. of Mining and Technology, Socorro, NM (United States)

    2017-11-01

    The Henkel technical data sheet (TDS) for Stycast 2651/Catalyst 11 lists three alternate cure schedules for the material, each of which would result in a different state of reaction and different material properties. Here, a cure schedule that attains full reaction of the material is defined. The use of this cure schedule will eliminate variance in material properties due to changes in the cure state of the material, and the cure schedule will serve as the method to make material prior to characterizing properties. The following recommendation was motivated by (1) a desire to cure at a single temperature for ease of manufacture and (2) a desire to keep the cure temperature low (to minimize residual stress build-up associated with the cooldown from the cure temperature to room temperature) without excessively limiting the cure reaction due to vitrification (i.e., material glass transition temperature, Tg, exceeding cure temperature).

  6. Job shop scheduling by local search

    NARCIS (Netherlands)

    Aarts, E.H.L.; Lenstra, J.K.; Laarhoven, van P.J.M.; Ulder, N.L.J.

    1992-01-01

    We present a computational performance analysis of local search algorithms for job shop scheduling. The algorithms under investigation are iterative improvement, simulated annealing, threshold accepting and genetic local search. Our study shows that simulated annealing performs best in the sense

  7. Scheduling job shop - A case study

    Science.gov (United States)

    Abas, M.; Abbas, A.; Khan, W. A.

    2016-08-01

    The scheduling in job shop is important for efficient utilization of machines in the manufacturing industry. There are number of algorithms available for scheduling of jobs which depend on machines tools, indirect consumables and jobs which are to be processed. In this paper a case study is presented for scheduling of jobs when parts are treated on available machines. Through time and motion study setup time and operation time are measured as total processing time for variety of products having different manufacturing processes. Based on due dates different level of priority are assigned to the jobs and the jobs are scheduled on the basis of priority. In view of the measured processing time, the times for processing of some new jobs are estimated and for efficient utilization of the machines available an algorithm is proposed and validated.

  8. Job scheduling in a heterogenous grid environment

    Energy Technology Data Exchange (ETDEWEB)

    Oliker, Leonid; Biswas, Rupak; Shan, Hongzhang; Smith, Warren

    2004-02-11

    Computational grids have the potential for solving large-scale scientific problems using heterogeneous and geographically distributed resources. However, a number of major technical hurdles must be overcome before this potential can be realized. One problem that is critical to effective utilization of computational grids is the efficient scheduling of jobs. This work addresses this problem by describing and evaluating a grid scheduling architecture and three job migration algorithms. The architecture is scalable and does not assume control of local site resources. The job migration policies use the availability and performance of computer systems, the network bandwidth available between systems, and the volume of input and output data associated with each job. An extensive performance comparison is presented using real workloads from leading computational centers. The results, based on several key metrics, demonstrate that the performance of our distributed migration algorithms is significantly greater than that of a local scheduling framework and comparable to a non-scalable global scheduling approach.

  9. The School Schedule--Servant or Mistress?

    Science.gov (United States)

    Holmes, Mark

    1984-01-01

    Pointing out that time is a dimension of school wealth, the author explores its use in school schedules. Administrators need to be aware of the relationship between time allocation and learning consequences. (MD)

  10. Economic and psychological burden of scheduled surgery ...

    African Journals Online (AJOL)

    Background: Cancellation of scheduled surgery creates a financial burden for hospitals, caregivers and ..... costs and disregard some of the aspects mentioned in the ..... cancellation of elective surgical procedures in a Spanish general.

  11. Onboard Autonomous Scheduling Intelligence System, Phase I

    Data.gov (United States)

    National Aeronautics and Space Administration — Scheduling the daily activities of the crew on a human space mission is currently a cumbersome job performed by a large team of operations experts on the ground....

  12. Home Appliance Load Scheduling with SEMIAH

    DEFF Research Database (Denmark)

    Jacobsen, Rune Hylsberg; Ghasem Azar, Armin; Zhang, Qi

    2015-01-01

    The European research project SEMIAH aims at designing a scalable infrastructure for residential demand response. This paper presents the progress towards a centralized load scheduling algorithm for controlling home appliances taking power grid constraints and satisfaction of consumers into account....

  13. Courts, Scheduled Damages, and Medical Malpractice Insurance

    DEFF Research Database (Denmark)

    Bertoli, Paola; Grembi, Veronica

    We assess the impact of the introduction of schedules of non-economic damages (i.e. tiered caps systems) on the behavior of insurers operating in the medical liability market for hospitals while controlling the performance of the judicial system, measured as court backlog. Using a difference......-in-differences strategy on Italian data, we find that the introduction of schedules increases the presence of insurers (i.e. medical liability market attractiveness) only in inefficient judicial districts. In the same way, court inefficiency is attractive to insurers for average values of schedules penetration...... of the market, with an increasing positive impact of inefficiency as the territorial coverage of schedules increases. Finally, no significant impact is registered on paid premiums. Our analysis sheds light on a complex set of elements affecting the decisions of insurers in malpractice markets. The analysis...

  14. 76 FR 18262 - January 2011 Pay Schedules

    Science.gov (United States)

    2011-04-01

    ... an OPM memorandum, CPM 2009-27. (See http://www.opm.gov/oca/compmemo/index.asp .) Executive Order... Schedule ($165,300 in 2011, the same level as in 2010). On December 27, 2010, OPM issued a memorandum (CPM...

  15. Crystal structure of PrOHSO4

    International Nuclear Information System (INIS)

    Fahey, J.A.; Williams, G.J.B.; Haschke, J.M.

    1979-01-01

    PrOHSO 4 was prepared by hydrothermal reaction of Pr(OH) 3 with Pr 2 (SO 4 ) 3 x H 2 O at 450 to 500 0 C and 1,200 +- 200 atm water pressure. The space group is P2 1 /c; the cell parameters are a = 4.488, b = 12.495, c = 7.091 A, β = 111.08, Z = 4, d/sub x/ = 4.49 g/cm 3 . Atomic coordinates and anisotropic thermal parameters are tabulated. A stereoscopic protection of the cation coordination sphere is shown and discussed. 2 figures, 3 tables

  16. Heuristic Approach for Balancing Shift Schedules

    International Nuclear Information System (INIS)

    Kim, Dae Ho; Yun, Young Su; Lee, Yong Hee

    2005-01-01

    In this paper, a heuristic approach for balancing shift schedules is proposed. For the shift schedules, various constraints which have usually been considered in realworld industry are used, and the objective is to minimize the differences of the workloads in each workgroup. The constraints and objective function are implemented in the proposed heuristic approach. Using a simple instance, the efficiency of the proposed heuristic approach is proved

  17. Algorithms for classical and modern scheduling problems

    OpenAIRE

    Ott, Sebastian

    2016-01-01

    Subject of this thesis is the design and the analysis of algorithms for scheduling problems. In the first part, we focus on energy-efficient scheduling, where one seeks to minimize the energy needed for processing certain jobs via dynamic adjustments of the processing speed (speed scaling). We consider variations and extensions of the standard model introduced by Yao, Demers, and Shenker in 1995 [79], including the addition of a sleep state, the avoidance of preemption, and variable speed lim...

  18. Maritime wideband communication networks video transmission scheduling

    CERN Document Server

    Yang, Tingting

    2014-01-01

    This Springer Brief covers emerging maritime wideband communication networks and how they facilitate applications such as maritime distress, urgency, safety and general communications. It provides valuable insight on the data transmission scheduling and protocol design for the maritime wideband network. This brief begins with an introduction to maritime wideband communication networks including the architecture, framework, operations and a comprehensive survey on current developments. The second part of the brief presents the resource allocation and scheduling for video packet transmission wit

  19. Lift scheduling organization : Lift Concept for Lemminkainen

    OpenAIRE

    Mingalimov, Iurii

    2015-01-01

    The purpose of the work was to make a simple schedule for the main contractors and clients to check and control workflow connected with lifts. It gathers works with electricity, construction, engineering networks, installing equipment and commissioning works. The schedule was carried out during working on the building site Aino in Saint Petersburg in Lemminkӓinen. The duration of work was 5 months. The lift concept in Lemminkӓinen is very well controlled in comparison with other buil...

  20. Revised data taking schedule with ion beams

    CERN Document Server

    Gazdzicki, Marek; Aduszkiewicz, A; Andrieu, B; Anticic, T; Antoniou, N; Argyriades, J; Asryan, A G; Baatar, B; Blondel, A; Blumer, J; Boldizsar, L; Bravar, A; Brzychczyk, J; Bubak, A; Bunyatov, S A; Choi, K U; Christakoglou, P; Chung, P; Cleymans, J; Derkach, D A; Diakonos, F; Dominik, W; Dumarchez, J; Engel, R; Ereditato, A; Feofilov, G A; Fodor, Z; Ferrero, A; Gazdzicki, M; Golubeva, M; Grebieszkow, K; Grzeszczuk, A; Guber, F; Hasegawa, T; Haungs, A; Igolkin, S; Ivanov, A S; Ivashkin, A; Kadija, K; Katrynska, N; Kielczewska, D; Kikola, D; Kisiel, J; Kobayashi, T; Kolesnikov, V I; Kolev, D; Kolevatov, R S; Kondratiev, V P; Kowalski, S; Kurepin, A; Lacey, R; Laszlo, A; Lyubushkin, V V; Majka, Z; I Malakhov, A; Marchionni, A; Marcinek, A; Maris, I; Matveev, V; Melkumov, G L; Meregaglia, A; Messina, M; Mijakowski, P; Mitrovski, M; Montaruli, T; Mrówczynski, St; Murphy, S; Nakadaira, T; Naumenko, P A; Nikolic, V; Nishikawa, K; Palczewski, T; Pálla, G; Panagiotou, A D; Peryt, W; Planeta, R; Pluta, J; Popov, B A; Posiadala, M; Przewlocki, P; Rauch, W; Ravonel, M; Renfordt, R; Röhrich, D; Rondio, E; Rossi, B; Roth, M; Rubbia, A; Rybczynski, M; Sadovskii, A; Sakashita, K; Schuster, T; Sekiguchi, T; Seyboth, P; Shibata, M; Sissakian, A N; Skrzypczak, E; Slodkowski, M; Sorin, A S; Staszel, P; Stefanek, G; Stepaniak, J; Strabel, C; Ströbele, H; Susa, T; Szentpétery, I; Szuba, M; Tada, M; Taranenko, A; Tsenov, R; Ulrich, R; Unger, M; Vassiliou, M; Vechernin, V V; Vesztergombi, G; Wlodarczyk, Z; Wojtaszek, A; Zipper, W; CERN. Geneva. SPS and PS Experiments Committee; SPSC

    2009-01-01

    This document presents the revised data taking schedule of NA61 with ion beams. The revision takes into account limitations due to the new LHC schedule as well as final results concerning the physics performance with secondary ion beams. It is proposed to take data with primary Ar and Xe beams in 2012 and 2014, respectively, and to test and use for physics a secondary B beam from primary Pb beam fragmentation in 2010, 2011 and 2013.

  1. Job schedul in Grid batch farms

    International Nuclear Information System (INIS)

    Gellrich, Andreas

    2014-01-01

    We present here a study for a scheduler which cooperates with the queueing system TORQUE and is tailored to the needs of a HEP-dominated large Grid site with around 10000 jobs slots. Triggered by severe scaling problems of MAUI, a scheduler, referred to as MYSCHED, was developed and put into operation. We discuss conceptional aspects as well as experiences after almost two years of running.

  2. Transformer ratio enhancement experiment

    International Nuclear Information System (INIS)

    Gai, W.; Power, J. G.; Kanareykin, A.; Neasheva, E.; Altmark, A.

    2004-01-01

    Recently, a multibunch scheme for efficient acceleration based on dielectric wakefield accelerator technology was outlined in J.G. Power, W. Gai, A. Kanareykin, X. Sun. PAC 2001 Proceedings, pp. 114-116, 2002. In this paper we present an experimental program for the design, development and demonstration of an Enhanced Transformer Ratio Dielectric Wakefield Accelerator (ETR-DWA). The principal goal is to increase the transformer ratio R, the parameter that characterizes the energy transfer efficiency from the accelerating structure to the accelerated electron beam. We present here an experimental design of a 13.625 GHz dielectric loaded accelerating structure, a laser multisplitter producing a ramped bunch train, and simulations of the bunch train parameters required. Experimental results of the accelerating structure bench testing and ramped pulsed train generation with the laser multisplitter are shown as well. Using beam dynamic simulations, we also obtain the focusing FODO lattice parameters

  3. Intake to Production Ratio

    DEFF Research Database (Denmark)

    Nazaroff, William; Weschler, Charles J.; Little, John C.

    2012-01-01

    BACKGROUND: Limited data are available to assess human exposure to thousands of chemicals currently in commerce. Information that relates human intake of a chemical to its production and use can help inform understanding of mechanisms and pathways that control exposure and support efforts...... to protect public health.OBJECTIVES: We introduce the intake-to-production ratio (IPR) as an economy-wide quantitative indicator of the extent to which chemical production results in human exposure.METHODS: The IPR was evaluated as the ratio of two terms: aggregate rate of chemical uptake in a human......(n-butyl) phthalate, 1,040 ppm for para-dichlorobenzene, 6,800 ppm for di(isobutyl) phthalate, 7,700 ppm for diethyl phthalate, and 8,000-24,000 ppm (range) for triclosan.CONCLUSION: The IPR is well suited as an aggregate metric of exposure intensity for characterizing population-level exposure to synthesized...

  4. Prescribed Travel Schedules for Fatigue Management

    Science.gov (United States)

    Whitmire, Alexandra; Johnston, Smith; Lockley, Steven

    2011-01-01

    The NASA Fatigue Management Team is developing recommendations for managing fatigue during travel and for shift work operations, as Clinical Practice Guidelines for the Management of Circadian Desynchrony in ISS Operations. The Guidelines provide the International Space Station (ISS ) flight surgeons and other operational clinicians with evidence-based recommendations for mitigating fatigue and other factors related to sleep loss and circadian desynchronization. As much international travel is involved both before and after flight, the guidelines provide recommendations for: pre-flight training, in-flight operations, and post-flight rehabilitation. The objective of is to standardize the process by which care is provided to crewmembers, ground controllers, and other support personnel such as trainers, when overseas travel or schedule shifting is required. Proper scheduling of countermeasures - light, darkness, melatonin, diet, exercise, and medications - is the cornerstone for facilitating circadian adaptation, improving sleep, enhancing alertness, and optimizing performance. The Guidelines provide, among other things, prescribed travel schedules that outline the specific implementation of these mitigation strategies. Each travel schedule offers evidence based protocols for properly using the NASA identified countermeasures for fatigue. This presentation will describe the travel implementation schedules and how these can be used to alleviate the effects of jet lag and/or schedule shifts.

  5. Integrated Job Scheduling and Network Routing

    DEFF Research Database (Denmark)

    Gamst, Mette; Pisinger, David

    2013-01-01

    We consider an integrated job scheduling and network routing problem which appears in Grid Computing and production planning. The problem is to schedule a number of jobs at a finite set of machines, such that the overall profit of the executed jobs is maximized. Each job demands a number of resou...... indicate that the algorithm can be used as an actual scheduling algorithm in the Grid or as a tool for analyzing Grid performance when adding extra machines or jobs. © 2012 Wiley Periodicals, Inc.......We consider an integrated job scheduling and network routing problem which appears in Grid Computing and production planning. The problem is to schedule a number of jobs at a finite set of machines, such that the overall profit of the executed jobs is maximized. Each job demands a number...... of resources which must be sent to the executing machine through a network with limited capacity. A job cannot start before all of its resources have arrived at the machine. The scheduling problem is formulated as a Mixed Integer Program (MIP) and proved to be NP-hard. An exact solution approach using Dantzig...

  6. Staffing, overtime, and shift scheduling project

    International Nuclear Information System (INIS)

    Lewis, P.M.

    1989-01-01

    Recent events at the Peach Bottom nuclear power plant have demonstrated the need to establish a quantifiable basis for assessing the safety significance of long work hours on nuclear power plant operators. The incidents at TMI-2, Chernobyl, and Bhopal, which all occurred during the late evening/night shift, further highlight the importance of the relationship between shift scheduling and performance. The objective of this project is to estimate, using statistical analysis on data from the nuclear industry, the effects on safety of staffing levels, overtime, and shift scheduling for operators and maintenance personnel. Regarding staffing levels, the Nuclear Regulatory Commission (NRC) currently has no explicit regulation concerning the minimum acceptable levels of staffing in a plant that has an operating license. The NRC has no systematic method for collecting data on the number of licensed operators on the operating crews. In 1982 the NRC recommended that plants write into their technical specifications a model policy on overtime. Currently, 77 nuclear power plant units have the model policy or a modification of it written into their technical specifications; 33 units have no policy on overtime. The model policy sets limits on overtime for safety related personnel, although these limits can be exceeded with plant manger approval. The US nuclear power industry has three types of shift schedules: (1) forward-rotating 8-hour/day shift schedules, (2) backward-rotating 8-hour/day schedules, and (3) 12-hour/day schedules

  7. Interactive Dynamic Mission Scheduling for ASCA

    Science.gov (United States)

    Antunes, A.; Nagase, F.; Isobe, T.

    The Japanese X-ray astronomy satellite ASCA (Advanced Satellite for Cosmology and Astrophysics) mission requires scheduling for each 6-month observation phase, further broken down into weekly schedules at a few minutes resolution. Two tools, SPIKE and NEEDLE, written in Lisp and C, use artificial intelligence (AI) techniques combined with a graphic user interface for fast creation and alteration of mission schedules. These programs consider viewing and satellite attitude constraints as well as observer-requested criteria and present an optimized set of solutions for review by the planner. Six-month schedules at 1 day resolution are created for an oversubscribed set of targets by the SPIKE software, originally written for HST and presently being adapted for EUVE, XTE and AXAF. The NEEDLE code creates weekly schedules at 1 min resolution using in-house orbital routines and creates output for processing by the command generation software. Schedule creation on both the long- and short-term scale is rapid, less than 1 day for long-term, and one hour for short-term.

  8. Self-scheduling with Microsoft Excel.

    Science.gov (United States)

    Irvin, S A; Brown, H N

    1999-01-01

    Excessive time was being spent by the emergency department (ED) staff, head nurse, and unit secretary on a complex 6-week manual self-scheduling system. This issue, plus inevitable errors and staff dissatisfaction, resulted in a manager-lead initiative to automate elements of the scheduling process using Microsoft Excel. The implementation of this initiative included: common coding of all 8-hour and 12-hour shifts, with each 4-hour period represented by a cell; the creation of a 6-week master schedule using the "count-if" function of Excel based on current staffing guidelines; staff time-off requests then entered by the department secretary; the head nurse, with staff input, then fine-tuned the schedule to provide even unit coverage. Outcomes of these changes included an increase in staff satisfaction, time saved by the head nurse, and staff work time saved because there was less arguing about the schedule. Ultimately, the automated self-scheduling method was expanded to the entire 700-bed hospital.

  9. Selective dopamine D3 receptor antagonism by SB-277011A attenuates cocaine reinforcement as assessed by progressive-ratio and variable-cost–variable-payoff fixed-ratio cocaine self-administration in rats

    Science.gov (United States)

    Xi, Zheng-Xiong; Gilbert, Jeremy G.; Pak, Arlene C.; Ashby, Charles R.; Heidbreder, Christian A.; Gardner, Eliot L.

    2013-01-01

    In rats, acute administration of SB-277011A, a highly selective dopamine (DA) D3 receptor antagonist, blocks cocaine-enhanced brain stimulation reward, cocaine-seeking behaviour and reinstatement of cocaine-seeking behaviour. Here, we investigated whether SB-277011A attenuates cocaine reinforcement as assessed by cocaine self-administration under variable-cost–variable-payoff fixed-ratio (FR) and progressive-ratio (PR) reinforcement schedules. Acute i.p. administration of SB-277011A (3–24 mg/kg) did not significantly alter cocaine (0.75 mg/kg/infusion) self-administration reinforced under FR1 (one lever press for one cocaine infusion) conditions. However, acute administration of SB-277011A (24 mg/kg, i.p.) progressively attenuated cocaine self-administration when: (a) the unit dose of self-administered cocaine was lowered from 0.75 to 0.125–0.5 mg/kg, and (b) the work demand for cocaine reinforcement was increased from FR1 to FR10. Under PR (increasing number of lever presses for each successive cocaine infusion) cocaine reinforcement, acute administration of SB-277011A (6–24 mg/kg i.p.) lowered the PR break point for cocaine self-administration in a dose-dependent manner. The reduction in the cocaine (0.25–1.0 mg/kg) dose–response break-point curve produced by 24 mg/kg SB-277011A is consistent with a reduction in cocaine’s reinforcing efficacy. When substituted for cocaine, SB-277011A alone did not sustain self-administration behaviour. In contrast with the mixed DA D2/D3 receptor antagonist haloperidol (1 mg/kg), SB-277011A (3, 12 or 24 mg/kg) failed to impede locomotor activity, failed to impair rearing behaviour, failed to produce catalepsy and failed to impair rotarod performance. These results show that SB-277011A significantly inhibits acute cocaine-induced reinforcement except at high cocaine doses and low work requirement for cocaine. If these results extrapolate to humans, SB-277011A or similar selective DA D3 receptor antagonists may be

  10. Estrogen and progesterone receptors have distinct roles in the establishment of the hyperplastic phenotype in PR-A transgenic mice

    Energy Technology Data Exchange (ETDEWEB)

    Simian, Marina; Bissell, Mina J.; Barcellos-Hoff, Mary Helen; Shyamala, Gopalan

    2009-05-11

    Expression of the A and B forms of progesterone receptor (PR) in an appropriate ratio is critical for mammary development. Mammary glands of PR-A transgenic mice, carrying an additional A form of PR as a transgene, exhibit morphological features associated with the development of mammary tumors. Our objective was to determine the roles of estrogen (E) and progesterone (P) in the genesis of mammary hyperplasias/preneoplasias in PR-A transgenics. We subjected PR-A mice to hormonal treatments and analyzed mammary glands for the presence of hyperplasias and used BrdU incorporation to measure proliferation. Quantitative image analysis was carried out to compare levels of latency-associated peptide and transforming growth factor beta 1 (TGF{beta}1) between PR-A and PR-B transgenics. Basement membrane disruption was examined by immunofluorescence and proteolytic activity by zymography. The hyperplastic phenotype of PR-A transgenics is inhibited by ovariectomy, and is reversed by treatment with E + P. Studies using the antiestrogen ICI 182,780 or antiprogestins RU486 or ZK 98,299 show that the increase in proliferation requires signaling through E/estrogen receptor alpha but is not sufficient to give rise to hyperplasias, whereas signaling through P/PR has little impact on proliferation but is essential for the manifestation of hyperplasias. Increased proliferation is correlated with decreased TGF{beta}1 activation in the PR-A transgenics. Analysis of basement membrane integrity showed loss of laminin-5, collagen III and collagen IV in mammary glands of PR-A mice, which is restored by ovariectomy. Examination of matrix metalloproteases (MMPs) showed that total levels of MMP-2 correlate with the steady-state levels of PR, and that areas of laminin-5 loss coincide with those of activation of MMP-2 in PR-A transgenics. Activation of MMP-2 is dependent on treatment with E and P in ovariectomized wild-type mice, but is achieved only by treatment with P in PR-A mice. These data

  11. PrP Knockout Cells Expressing Transmembrane PrP Resist Prion Infection.

    Science.gov (United States)

    Marshall, Karen E; Hughson, Andrew; Vascellari, Sarah; Priola, Suzette A; Sakudo, Akikazu; Onodera, Takashi; Baron, Gerald S

    2017-01-15

    Glycosylphosphatidylinositol (GPI) anchoring of the prion protein (PrP C ) influences PrP C misfolding into the disease-associated isoform, PrP res , as well as prion propagation and infectivity. GPI proteins are found in cholesterol- and sphingolipid-rich membrane regions called rafts. Exchanging the GPI anchor for a nonraft transmembrane sequence redirects PrP C away from rafts. Previous studies showed that nonraft transmembrane PrP C variants resist conversion to PrP res when transfected into scrapie-infected N2a neuroblastoma cells, likely due to segregation of transmembrane PrP C and GPI-anchored PrP res in distinct membrane environments. Thus, it remained unclear whether transmembrane PrP C might convert to PrP res if seeded by an exogenous source of PrP res not associated with host cell rafts and without the potential influence of endogenous expression of GPI-anchored PrP C To further explore these questions, constructs containing either a C-terminal wild-type GPI anchor signal sequence or a nonraft transmembrane sequence containing a flexible linker were expressed in a cell line derived from PrP knockout hippocampal neurons, NpL2. NpL2 cells have physiological similarities to primary neurons, representing a novel and advantageous model for studying transmissible spongiform encephalopathy (TSE) infection. Cells were infected with inocula from multiple prion strains and in different biochemical states (i.e., membrane bound as in brain microsomes from wild-type mice or purified GPI-anchorless amyloid fibrils). Only GPI-anchored PrP C supported persistent PrP res propagation. Our data provide strong evidence that in cell culture GPI anchor-directed membrane association of PrP C is required for persistent PrP res propagation, implicating raft microdomains as a location for conversion. Mechanisms of prion propagation, and what makes them transmissible, are poorly understood. Glycosylphosphatidylinositol (GPI) membrane anchoring of the prion protein (PrP C

  12. Thermoelectric power of PrMg3

    Science.gov (United States)

    Isikawa, Yosikazu; Somiya, Kazuya; Koyanagi, Huruto; Mizushima, Toshio; Kuwai, Tomohiko; Tayama, Takashi

    2010-01-01

    PrMg3 is supposed to be one of the strongly correlated electron systems originated from the hybridization between the Pr 4f and conduction electrons, because the gigantic electronic specific heat coefficient C/T was observed at low temperatures. However, a typical behaviour of - ln T dependence was not observed in the temperature dependence of the electrical resistivity. The thermoelectric power S is a powerful tool to investigate the density of states at the Fermi energy. We measured carefully the thermoelectric power of PrMg3 in the temperature range between 2 and 300 K. S is extremely small, ranged within ±1 μV/K over the whole temperature. The value of S/T at low temperature limit was also significantly smaller than expected from the specific heat results. We therefore conclude that the density of state at the Fermi level is not enhanced in PrMg3.

  13. Thermoelectric power of PrMg3

    International Nuclear Information System (INIS)

    Isikawa, Yosikazu; Somiya, Kazuya; Koyanagi, Huruto; Mizushima, Toshio; Kuwai, Tomohiko; Tayama, Takashi

    2010-01-01

    PrMg 3 is supposed to be one of the strongly correlated electron systems originated from the hybridization between the Pr 4f and conduction electrons, because the gigantic electronic specific heat coefficient C/T was observed at low temperatures. However, a typical behaviour of - ln T dependence was not observed in the temperature dependence of the electrical resistivity. The thermoelectric power S is a powerful tool to investigate the density of states at the Fermi energy. We measured carefully the thermoelectric power of PrMg 3 in the temperature range between 2 and 300 K. S is extremely small, ranged within ±1 μV/K over the whole temperature. The value of S/T at low temperature limit was also significantly smaller than expected from the specific heat results. We therefore conclude that the density of state at the Fermi level is not enhanced in PrMg 3 .

  14. Two-user opportunistic scheduling using hierarchical modulations in wireless networks with heterogenous average link gains

    KAUST Repository

    Hossain, Md Jahangir; Alouini, Mohamed-Slim; Bhargava, Vijay K.

    2010-01-01

    -user opportunistic scheduling (HTS) scheme based on our earlier proposed TBS scheme. This HTS scheme selects the first user based on the largest absolute CNR value among all the users while the second user is selected based on the ratios of the absolute CNRs

  15. Crystal Field Levels of Pr3+ in PrFeO3 and PrGaO3 Determined by Inelastic Neutron Scattering

    DEFF Research Database (Denmark)

    Feldmann, K.; Henning, K.; Kaun, L.

    1975-01-01

    The crystal field splitting of the 3H4 ground state of the Pr ion in PrFeO3 and PrGaO3 has been investigated by inelastic scattering of thermal neutrons. At several temperatures the transitions have been measured by TAS and TOF methods for polycrystalline PrFeO3 and by the TOF method...... for polycrystalline PrGaO3. Energy level schemes which are different for these materials are given....

  16. The impact of sex ratio and economic status on local birth rates

    OpenAIRE

    Chipman, A.; Morrison, E.

    2013-01-01

    Human mating and reproductive behaviour can vary depending on various mechanisms, including the local sex ratio. Previous research shows that as sex ratios become female-biased, women from economically deprived areas are less likely to delay reproductive opportunities to wait for a high-investing mate but instead begin their reproductive careers sooner. Here, we show that the local sex ratio also has an impact on female fertility schedules. At young ages, a female-biased ratio is associated w...

  17. Schedule Matters: Understanding the Relationship between Schedule Delays and Costs on Overruns

    Science.gov (United States)

    Majerowicz, Walt; Shinn, Stephen A.

    2016-01-01

    This paper examines the relationship between schedule delays and cost overruns on complex projects. It is generally accepted by many project practitioners that cost overruns are directly related to schedule delays. But what does "directly related to" actually mean? Some reasons or root causes for schedule delays and associated cost overruns are obvious, if only in hindsight. For example, unrealistic estimates, supply chain difficulties, insufficient schedule margin, technical problems, scope changes, or the occurrence of risk events can negatively impact schedule performance. Other factors driving schedule delays and cost overruns may be less obvious and more difficult to quantify. Examples of these less obvious factors include project complexity, flawed estimating assumptions, over-optimism, political factors, "black swan" events, or even poor leadership and communication. Indeed, is it even possible the schedule itself could be a source of delay and subsequent cost overrun? Through literature review, surveys of project practitioners, and the authors' own experience on NASA programs and projects, the authors will categorize and examine the various factors affecting the relationship between project schedule delays and cost growth. The authors will also propose some ideas for organizations to consider to help create an awareness of the factors which could cause or influence schedule delays and associated cost growth on complex projects.

  18. Integrating Preventive Maintenance Scheduling As Probability Machine Failure And Batch Production Scheduling

    Directory of Open Access Journals (Sweden)

    Zahedi Zahedi

    2016-06-01

    Full Text Available This paper discusses integrated model of batch production scheduling and machine maintenance scheduling. Batch production scheduling uses minimize total actual flow time criteria and machine maintenance scheduling uses the probability of machine failure based on Weibull distribution. The model assumed no nonconforming parts in a planning horizon. The model shows an increase in the number of the batch (length of production run up to a certain limit will minimize the total actual flow time. Meanwhile, an increase in the length of production run will implicate an increase in the number of PM. An example was given to show how the model and algorithm work.

  19. Phase diagrams of Pr-C system

    International Nuclear Information System (INIS)

    Eremenko, V.N.; Velikanova, T.Ya.; Gordijchuk, O.V.

    1988-01-01

    Results of the X-ray phase, metallographic and high-temperature differential thermal analysis are used for the first time to plot a diagram of the Pr-C system state. Carbides are formed in the system: Pr 2 C 3 with the bcc-structure of the Pu 2 C 3 type and with the period a 0 = 0.85722+-0.00026 within the phase region + 2 C 3 >, a 0 0.86078+-0.00016 nm - within the region 2 C 3 >+α-PrC 2 ; dimorphous PrC 2 : α-PrC 2 with the bct-structure of the CaC 2 type and periods a 0.38517+-0.00011, c 0 = 0.64337+-0.00019 nm; β-PrC 2 with the fcc-structure, probably, of KCN type. Dicarbide melts congruently at 2320 grad. C, forming eutectics with graphite at 2254+-6 grad. C and composition of 71.5% (at.)C. It is polymorphously transformed in the phase region 2 C 3 > + 2 > at 1145+-4 grad. C, and in the region 2 >+C at 1134+-4 grad. C. Sesquicarbide melts incongruently at 1545+-4 grad. C. The eutectic reaction L ↔ + 2 C 3 > occurs at 800+-4 grad. C, the eutectic composition ∼ 15% (at.)C. The temperature of the eutectoid reaction ↔ + 2 C 3 > is 675+-6 grad C. The limiting carbon solubility in β-Pr is about 8 and in α-Pr it is about 5% (at.)

  20. On the subgroups of PR groups

    International Nuclear Information System (INIS)

    Lebedenko, V.M.

    1979-01-01

    The subgroups of PR-groups are being studied, i.e., the subgroups of connected and simply connected nonabelian Lie groups, their Lie algebras being defined by the commuting relations of the type [Hsub(i), Hsub(j)] = rsub(ij)Hsub(i) (i 1 of PR-group G there exists such complementary subgroup G 2 and that group G is expanded in semidirect product G = G 1 xG 2 [ru

  1. Revisiting progesterone receptor (PR) actions in breast cancer: Insights into PR repressive functions.

    Science.gov (United States)

    Proietti, Cecilia J; Cenciarini, Mauro E; Elizalde, Patricia V

    2018-05-01

    Progesterone receptor (PR) is a master regulator in female reproductive tissues that controls developmental processes and proliferation and differentiation during the reproductive cycle and pregnancy. PR also plays a role in progression of endocrine-dependent breast cancer. As a member of the nuclear receptor family of ligand-dependent transcription factors, the main action of PR is to regulate networks of target gene expression in response to binding its cognate steroid hormone, progesterone. Liganded-PR transcriptional activation has been thoroughly studied and associated mechanisms have been described while progesterone-mediated repression has remained less explored. The present work summarizes recent advances in the understanding of how PR-mediated repression is accomplished in breast cancer cells and highlights the significance of fully understanding the determinants of context-dependent PR action. Copyright © 2018 Elsevier Inc. All rights reserved.

  2. The Reference Return Ratio

    DEFF Research Database (Denmark)

    Nicolaisen, Jeppe; Faber Frandsen, Tove

    2008-01-01

    The paper introduces a new journal impact measure called The Reference Return Ratio (3R). Unlike the traditional Journal Impact Factor (JIF), which is based on calculations of publications and citations, the new measure is based on calculations of bibliographic investments (references) and returns...... (citations). A comparative study of the two measures shows a strong relationship between the 3R and the JIF. Yet, the 3R appears to correct for citation habits, citation dynamics, and composition of document types - problems that typically are raised against the JIF. In addition, contrary to traditional...

  3. On the dimorphism of Pr{sub 6}Mo{sub 10}O{sub 39}

    Energy Technology Data Exchange (ETDEWEB)

    Rudolph, Daniel; Laufer, Sonja; Hartenbach, Ingo [Stuttgart Univ. (Germany). Inst. for Inorganic Chemistry

    2017-07-01

    Attempts to synthesize Pr{sub 4}Mo{sub 7}O{sub 27} using Pr, Pr{sub 6}O{sub 11} and MoO{sub 3} in a molar ratio of 8:6:77 led to a main product of scheelite-type Pr{sub 0.667}[MoO{sub 4}] and few single crystals of the triclinic A-type Pr{sub 6}Mo{sub 10}O{sub 39}. The latter crystallizes in space group P anti 1 (a=945.25(1), b=1058.49(2), c=1815.16(3) pm; α=104.149(1), β=95.220(1), γ=102.617(1) , Z=2). Its crystal structure comprises six crystallographically independent Pr{sup 3+} cations, eight tetrahedral [MoO{sub 4}]{sup 2-} units, and one [Mo{sub 2}O{sub 7}]{sup 2-} entity. The cations display coordination numbers of seven (1 x) and eight (5 x), while the [MoO{sub 4}]{sup 2-} tetrahedra are surrounded by five Pr{sup 3+} cations each. The [Mo{sub 2}O{sub 7}]{sup 2-} anions exhibit a coordination environment of seven Pr{sup 3+} cations. The attempt to synthesize PrF[MoO{sub 4}] using PrOF (from in situ thermal decomposition of PrF[CO{sub 3}]) as reagent did not lead to the desired product but to monoclinic B-type Pr{sub 6}Mo{sub 10}O{sub 39}. This slightly less dense modification compared to its triclinic analogue crystallizes in space group C2/c (a=1247.93(3), b=1989.68(6), c=1392.52 (4) pm, β=100.505(2) , Z=4) with three crystallographically independent Pr{sup 3+} cations, four [MoO{sub 4}]{sup 2-} tetrahedra, and again one [Mo{sub 2}O{sub 7}]{sup 2-} unit in the crystal structure. Thus, both Pr{sub 6}Mo{sub 10}O{sub 39} modifications are better described with the structured formula Pr{sub 6}[MoO{sub 4}]{sub 8}[Mo{sub 2}O{sub 7}]. The coordination numbers around the Pr{sup 3+} cations are seven (1 x) and eight (2 x) while all four [MoO{sub 4}]{sup 2-} anions are again surrounded by five Pr{sup 3+} cations each. Six of the latter represent the coordination environment around the [Mo{sub 2}O{sub 7}]{sup 2-} entities. Besides the thorough comparison of the crystal structures single crystal Raman spectra were recorded for both Pr{sub 6}Mo{sub 10}O{sub 39

  4. Tau hadronic branching ratios

    CERN Document Server

    Buskulic, Damir; De Bonis, I; Décamp, D; Ghez, P; Goy, C; Lees, J P; Lucotte, A; Minard, M N; Odier, P; Pietrzyk, B; Ariztizabal, F; Chmeissani, M; Crespo, J M; Efthymiopoulos, I; Fernández, E; Fernández-Bosman, M; Gaitan, V; Martínez, M; Orteu, S; Pacheco, A; Padilla, C; Palla, Fabrizio; Pascual, A; Perlas, J A; Sánchez, F; Teubert, F; Colaleo, A; Creanza, D; De Palma, M; Farilla, A; Gelao, G; Girone, M; Iaselli, Giuseppe; Maggi, G; Maggi, M; Marinelli, N; Natali, S; Nuzzo, S; Ranieri, A; Raso, G; Romano, F; Ruggieri, F; Selvaggi, G; Silvestris, L; Tempesta, P; Zito, G; Huang, X; Lin, J; Ouyang, Q; Wang, T; Xie, Y; Xu, R; Xue, S; Zhang, J; Zhang, L; Zhao, W; Bonvicini, G; Cattaneo, M; Comas, P; Coyle, P; Drevermann, H; Engelhardt, A; Forty, Roger W; Frank, M; Hagelberg, R; Harvey, J; Jacobsen, R; Janot, P; Jost, B; Kneringer, E; Knobloch, J; Lehraus, Ivan; Markou, C; Martin, E B; Mato, P; Minten, Adolf G; Miquel, R; Oest, T; Palazzi, P; Pater, J R; Pusztaszeri, J F; Ranjard, F; Rensing, P E; Rolandi, Luigi; Schlatter, W D; Schmelling, M; Schneider, O; Tejessy, W; Tomalin, I R; Venturi, A; Wachsmuth, H W; Wiedenmann, W; Wildish, T; Witzeling, W; Wotschack, J; Ajaltouni, Ziad J; Bardadin-Otwinowska, Maria; Barrès, A; Boyer, C; Falvard, A; Gay, P; Guicheney, C; Henrard, P; Jousset, J; Michel, B; Monteil, S; Pallin, D; Perret, P; Podlyski, F; Proriol, J; Rossignol, J M; Saadi, F; Fearnley, Tom; Hansen, J B; Hansen, J D; Hansen, J R; Hansen, P H; Nilsson, B S; Kyriakis, A; Simopoulou, Errietta; Siotis, I; Vayaki, Anna; Zachariadou, K; Blondel, A; Bonneaud, G R; Brient, J C; Bourdon, P; Passalacqua, L; Rougé, A; Rumpf, M; Tanaka, R; Valassi, Andrea; Verderi, M; Videau, H L; Candlin, D J; Parsons, M I; Focardi, E; Parrini, G; Corden, M; Delfino, M C; Georgiopoulos, C H; Jaffe, D E; Antonelli, A; Bencivenni, G; Bologna, G; Bossi, F; Campana, P; Capon, G; Chiarella, V; Felici, G; Laurelli, P; Mannocchi, G; Murtas, F; Murtas, G P; Pepé-Altarelli, M; Dorris, S J; Halley, A W; ten Have, I; Knowles, I G; Lynch, J G; Morton, W T; O'Shea, V; Raine, C; Reeves, P; Scarr, J M; Smith, K; Smith, M G; Thompson, A S; Thomson, F; Thorn, S; Turnbull, R M; Becker, U; Braun, O; Geweniger, C; Graefe, G; Hanke, P; Hepp, V; Kluge, E E; Putzer, A; Rensch, B; Schmidt, M; Sommer, J; Stenzel, H; Tittel, K; Werner, S; Wunsch, M; Beuselinck, R; Binnie, David M; Cameron, W; Colling, D J; Dornan, Peter J; Konstantinidis, N P; Moneta, L; Moutoussi, A; Nash, J; San Martin, G; Sedgbeer, J K; Stacey, A M; Dissertori, G; Girtler, P; Kuhn, D; Rudolph, G; Bowdery, C K; Brodbeck, T J; Colrain, P; Crawford, G; Finch, A J; Foster, F; Hughes, G; Sloan, Terence; Whelan, E P; Williams, M I; Galla, A; Greene, A M; Kleinknecht, K; Quast, G; Raab, J; Renk, B; Sander, H G; Wanke, R; Van Gemmeren, P; Zeitnitz, C; Aubert, Jean-Jacques; Bencheikh, A M; Benchouk, C; Bonissent, A; Bujosa, G; Calvet, D; Carr, J; Diaconu, C A; Etienne, F; Thulasidas, M; Nicod, D; Payre, P; Rousseau, D; Talby, M; Abt, I; Assmann, R W; Bauer, C; Blum, Walter; Brown, D; Dietl, H; Dydak, Friedrich; Ganis, G; Gotzhein, C; Jakobs, K; Kroha, H; Lütjens, G; Lutz, Gerhard; Männer, W; Moser, H G; Richter, R H; Rosado-Schlosser, A; Schael, S; Settles, Ronald; Seywerd, H C J; Saint-Denis, R; Wolf, G; Alemany, R; Boucrot, J; Callot, O; Cordier, A; Courault, F; Davier, M; Duflot, L; Grivaz, J F; Heusse, P; Jacquet, M; Kim, D W; Le Diberder, F R; Lefrançois, J; Lutz, A M; Musolino, G; Nikolic, I A; Park, H J; Park, I C; Schune, M H; Simion, S; Veillet, J J; Videau, I; Abbaneo, D; Azzurri, P; Bagliesi, G; Batignani, G; Bettarini, S; Bozzi, C; Calderini, G; Carpinelli, M; Ciocci, M A; Ciulli, V; Dell'Orso, R; Fantechi, R; Ferrante, I; Foà, L; Forti, F; Giassi, A; Giorgi, M A; Gregorio, A; Ligabue, F; Lusiani, A; Marrocchesi, P S; Messineo, A; Rizzo, G; Sanguinetti, G; Sciabà, A; Spagnolo, P; Steinberger, Jack; Tenchini, Roberto; Tonelli, G; Triggiani, G; Vannini, C; Verdini, P G; Walsh, J; Betteridge, A P; Blair, G A; Bryant, L M; Cerutti, F; Gao, Y; Green, M G; Johnson, D L; Medcalf, T; Mir, L M; Perrodo, P; Strong, J A; Bertin, V; Botterill, David R; Clifft, R W; Edgecock, T R; Haywood, S; Edwards, M; Maley, P; Norton, P R; Thompson, J C; Bloch-Devaux, B; Colas, P; Emery, S; Kozanecki, Witold; Lançon, E; Lemaire, M C; Locci, E; Marx, B; Pérez, P; Rander, J; Renardy, J F; Roussarie, A; Schuller, J P; Schwindling, J; Trabelsi, A; Vallage, B; Johnson, R P; Kim, H Y; Litke, A M; McNeil, M A; Taylor, G; Beddall, A; Booth, C N; Boswell, R; Cartwright, S L; Combley, F; Dawson, I; Köksal, A; Letho, M; Newton, W M; Rankin, C; Thompson, L F; Böhrer, A; Brandt, S; Cowan, G D; Feigl, E; Grupen, Claus; Lutters, G; Minguet-Rodríguez, J A; Rivera, F; Saraiva, P; Smolik, L; Stephan, F; Apollonio, M; Bosisio, L; Della Marina, R; Giannini, G; Gobbo, B; Ragusa, F; Rothberg, J E; Wasserbaech, S R; Armstrong, S R; Bellantoni, L; Elmer, P; Feng, Z; Ferguson, D P S; Gao, Y S; González, S; Grahl, J; Harton, J L; Hayes, O J; Hu, H; McNamara, P A; Nachtman, J M; Orejudos, W; Pan, Y B; Saadi, Y; Schmitt, M; Scott, I J; Sharma, V; Turk, J; Walsh, A M; Wu Sau Lan; Wu, X; Yamartino, J M; Zheng, M; Zobernig, G

    1996-01-01

    From 64492 selected \\tau-pair events, produced at the Z^0 resonance, the measurement of the tau decays into hadrons from a global analysis using 1991, 1992 and 1993 ALEPH data is presented. Special emphasis is given to the reconstruction of photons and \\pi^0's, and the removal of fake photons. A detailed study of the systematics entering the \\pi^0 reconstruction is also given. A complete and consistent set of tau hadronic branching ratios is presented for 18 exclusive modes. Most measurements are more precise than the present world average. The new level of precision reached allows a stringent test of \\tau-\\mu universality in hadronic decays, g_\\tau/g_\\mu \\ = \\ 1.0013 \\ \\pm \\ 0.0095, and the first measurement of the vector and axial-vector contributions to the non-strange hadronic \\tau decay width: R_{\\tau ,V} \\ = \\ 1.788 \\ \\pm \\ 0.025 and R_{\\tau ,A} \\ = \\ 1.694 \\ \\pm \\ 0.027. The ratio (R_{\\tau ,V} - R_{\\tau ,A}) / (R_{\\tau ,V} + R_{\\tau ,A}), equal to (2.7 \\pm 1.3) \\ \\%, is a measure of the importance of Q...

  5. Photon cascade luminescence from Pr3+ ions in LiPrP4O12 polyphosphate

    International Nuclear Information System (INIS)

    Shalapska, T; Stryganyuk, G; Romanyshyn, Yu; Demchenko, P; Voloshinovskii, A; Trots, D; Gektin, A; Dorenbos, P

    2010-01-01

    The spectral-kinetic properties of luminescence from LiY 1-x Pr x P 4 O 12 (x = 1, 0.1) phosphors are studied in the 10-300 K temperature range upon excitation within the UV-VUV spectral range. The luminescence observed for LiPrP 4 O 12 at low temperatures is attributed to both intra-configurational 4f 2 → 4f 2 and inter-configurational 4f5d → 4f 2 radiative transitions of Pr 3+ . The temperature dependence of emission and the decay kinetics of Pr 3+ luminescence from LiY 1-x Pr x P 4 O 12 (x = 1, 0.1) phosphors are explained by temperature stimulated transitions from the 1 S 0 to the Pr 3+ 4f5d state. At low temperatures, the energy potential barrier between the 1 S 0 and 4f5d states is 0.014 eV for LiPrP 4 O 12 . The spectral overlap of the 1 S 0 and 4f5d states of Pr 3+ in LiY 0.9 Pr 0.1 P 4 O 12 determines the luminescence properties in the entire temperature range studied.

  6. Ratio and rate effects of 32P-triple superphosphate and phosphate rock mixtures on corn growth

    International Nuclear Information System (INIS)

    Franzini, Vinicius Ide; Mendes, Fernanda Latanze

    2009-01-01

    The availability of phosphorus (P) from 'Patos de Minas' phosphate rock (PR) can be improved if it is applied mixed with a water-soluble P source. The objective of this study was to evaluate 32 P as a tracer to quantify the effect of the ratio of mixtures of triple superphosphate (TSP) with PR and the rates of application on P availability from PR. Two experiments were conducted in a greenhouse utilizing corn (Zea mays L.) plants as test crop. In the first experiment, the P sources were applied at the rate of 90 mg P kg -1 soil either separately or as compacted mixtures in several TSP:PR ratios (100:0, 80:20, 60:40, 50:50, 40:60, 20:80 and 0:100 calculated on the basis of the total P content). In the second experiment, the TSP was applied alone or as 50:50 compacted mixtures with PR applied at four P rates (15, 30, 60 and 90 mg P kg -1 ) while the sole PR treatment was applied at the 90 mg kg -1 P rate . The mixture of PR with TSP improved the P recovery from PR in the corn plant and this effect increased proportionally to the TSP amounts in the mixture. When compared with the plant P recovery from TSP (10.52%), PR-P recovery (2.57%) was much lower even when mixed together in the ratio of 80% TSP: 20% PR. There was no difference in PR-P utilization by the corn plants with increasing P rates in the mixture (1:1 proportion). Therefore, PR-P availability is affected by the proportions of the mixtures with water soluble P, but not by P rates. (author)

  7. Ratio and rate effects of {sup 32}P-triple superphosphate and phosphate rock mixtures on corn growth

    Energy Technology Data Exchange (ETDEWEB)

    Franzini, Vinicius Ide; Mendes, Fernanda Latanze [Escola Superior de Agricultura Luiz de Queiroz (ESALQ/USP), Piracicaba, SP (Brazil). Programa de Pos-Graduacao em Solos e Nutricao de Plantas; Muraoka, Takashi [Centro de Energia Nuclear na Agricultura (CENA-USP), Piracicaba, SP (Brazil)]. E-mail: muraoka@cena.usp.br

    2009-01-15

    The availability of phosphorus (P) from 'Patos de Minas' phosphate rock (PR) can be improved if it is applied mixed with a water-soluble P source. The objective of this study was to evaluate {sup 32}P as a tracer to quantify the effect of the ratio of mixtures of triple superphosphate (TSP) with PR and the rates of application on P availability from PR. Two experiments were conducted in a greenhouse utilizing corn (Zea mays L.) plants as test crop. In the first experiment, the P sources were applied at the rate of 90 mg P kg{sup -1} soil either separately or as compacted mixtures in several TSP:PR ratios (100:0, 80:20, 60:40, 50:50, 40:60, 20:80 and 0:100 calculated on the basis of the total P content). In the second experiment, the TSP was applied alone or as 50:50 compacted mixtures with PR applied at four P rates (15, 30, 60 and 90 mg P kg{sup -1}) while the sole PR treatment was applied at the 90 mg kg{sup -1}P rate . The mixture of PR with TSP improved the P recovery from PR in the corn plant and this effect increased proportionally to the TSP amounts in the mixture. When compared with the plant P recovery from TSP (10.52%), PR-P recovery (2.57%) was much lower even when mixed together in the ratio of 80% TSP: 20% PR. There was no difference in PR-P utilization by the corn plants with increasing P rates in the mixture (1:1 proportion). Therefore, PR-P availability is affected by the proportions of the mixtures with water soluble P, but not by P rates. (author)

  8. Planning and Scheduling for Environmental Sensor Networks

    Science.gov (United States)

    Frank, J. D.

    2005-12-01

    Environmental Sensor Networks are a new way of monitoring the environment. They comprise autonomous sensor nodes in the environment that record real-time data, which is retrieved, analyzed, integrated with other data sets (e.g. satellite images, GIS, process models) and ultimately lead to scientific discoveries. Sensor networks must operate within time and resource constraints. Sensors have limited onboard memory, energy, computational power, communications windows and communications bandwidth. The value of data will depend on when, where and how it was collected, how detailed the data is, how long it takes to integrate the data, and how important the data was to the original scientific question. Planning and scheduling of sensor networks is necessary for effective, safe operations in the face of these constraints. For example, power bus limitations may preclude sensors from simultaneously collecting data and communicating without damaging the sensor; planners and schedulers can ensure these operations are ordered so that they do not happen simultaneously. Planning and scheduling can also ensure best use of the sensor network to maximize the value of collected science data. For example, if data is best recorded using a particular camera angle but it is costly in time and energy to achieve this, planners and schedulers can search for times when time and energy are available to achieve the optimal camera angle. Planning and scheduling can handle uncertainty in the problem specification; planners can be re-run when new information is made available, or can generate plans that include contingencies. For example, if bad weather may prevent the collection of data, a contingent plan can check lighting conditions and turn off data collection to save resources if lighting is not ideal. Both mobile and immobile sensors can benefit from planning and scheduling. For example, data collection on otherwise passive sensors can be halted to preserve limited power and memory

  9. Interoceanic canal excavation scheduling via computer simulation

    Energy Technology Data Exchange (ETDEWEB)

    Baldonado, Orlino C [Holmes and Narver, Inc., Los Angeles, CA (United States)

    1970-05-15

    The computer simulation language GPSS/360 was used to simulate the schedule of several nuclear detonation programs for the interoceanic canal project. The effects of using different weather restriction categories due to air blast and fallout were investigated. The effect of increasing the number of emplacement and stemming crews and the effect of varying the reentry period after detonating a row charge or salvo were also studied. Detonation programs were simulated for the proposed Routes 17A and 25E. The study demonstrates the method of using computer simulation so that a schedule and its associated constraints can be assessed for feasibility. Since many simulation runs can be made for a given set of detonation program constraints, one readily obtains an average schedule for a range of conditions. This provides a method for analyzing time-sensitive operations so that time and cost-effective operational schedules can be established. A comparison of the simulated schedules with those that were published shows them to be similar. (author)

  10. Integrated network design and scheduling problems :

    Energy Technology Data Exchange (ETDEWEB)

    Nurre, Sarah G.; Carlson, Jeffrey J.

    2014-01-01

    We consider the class of integrated network design and scheduling problems. These problems focus on selecting and scheduling operations that will change the characteristics of a network, while being speci cally concerned with the performance of the network over time. Motivating applications of INDS problems include infrastructure restoration after extreme events and building humanitarian distribution supply chains. While similar models have been proposed, no one has performed an extensive review of INDS problems from their complexity, network and scheduling characteristics, information, and solution methods. We examine INDS problems under a parallel identical machine scheduling environment where the performance of the network is evaluated by solving classic network optimization problems. We classify that all considered INDS problems as NP-Hard and propose a novel heuristic dispatching rule algorithm that selects and schedules sets of arcs based on their interactions in the network. We present computational analysis based on realistic data sets representing the infrastructures of coastal New Hanover County, North Carolina, lower Manhattan, New York, and a realistic arti cial community CLARC County. These tests demonstrate the importance of a dispatching rule to arrive at near-optimal solutions during real-time decision making activities. We extend INDS problems to incorporate release dates which represent the earliest an operation can be performed and exible release dates through the introduction of specialized machine(s) that can perform work to move the release date earlier in time. An online optimization setting is explored where the release date of a component is not known.

  11. Maternal Nonstandard Work Schedules and Breastfeeding Behaviors.

    Science.gov (United States)

    Zilanawala, Afshin

    2017-06-01

    Objectives Although maternal employment rates have increased in the last decade in the UK, there is very little research investigating the linkages between maternal nonstandard work schedules (i.e., work schedules outside of the Monday through Friday, 9-5 schedule) and breastfeeding initiation and duration, especially given the wide literature citing the health advantages of breastfeeding for mothers and children. Methods This paper uses a population-based, UK cohort study, the Millennium Cohort Study (n = 17,397), to investigate the association between types of maternal nonstandard work (evening, night, away from home overnight, and weekends) and breastfeeding behaviors. Results In unadjusted models, exposure to evening shifts was associated with greater odds of breastfeeding initiation (OR 1.71, CI 1.50-1.94) and greater odds of short (OR 1.55, CI 1.32-1.81), intermediate (OR 2.01, CI 1.64-2.47), prolonged partial duration (OR 2.20, CI 1.78-2.72), and prolonged exclusive duration (OR 1.53, CI 1.29-1.82), compared with mothers who were unemployed and those who work other types of nonstandard shifts. Socioeconomic advantage of mothers working evening schedules largely explained the higher odds of breastfeeding initiation and duration. Conclusions Socioeconomic characteristics explain more breastfeeding behaviors among mothers working evening shifts. Policy interventions to increase breastfeeding initiation and duration should consider the timing of maternal work schedules.

  12. Realistic Scheduling Mechanism for Smart Homes

    Directory of Open Access Journals (Sweden)

    Danish Mahmood

    2016-03-01

    Full Text Available In this work, we propose a Realistic Scheduling Mechanism (RSM to reduce user frustration and enhance appliance utility by classifying appliances with respective constraints and their time of use effectively. Algorithms are proposed regarding functioning of home appliances. A 24 hour time slot is divided into four logical sub-time slots, each composed of 360 min or 6 h. In these sub-time slots, only desired appliances (with respect to appliance classification are scheduled to raise appliance utility, restricting power consumption by a dynamically modelled power usage limiter that does not only take the electricity consumer into account but also the electricity supplier. Once appliance, time and power usage limiter modelling is done, we use a nature-inspired heuristic algorithm, Binary Particle Swarm Optimization (BPSO, optimally to form schedules with given constraints representing each sub-time slot. These schedules tend to achieve an equilibrium amongst appliance utility and cost effectiveness. For validation of the proposed RSM, we provide a comparative analysis amongst unscheduled electrical load usage, scheduled directly by BPSO and RSM, reflecting user comfort, which is based upon cost effectiveness and appliance utility.

  13. Step-by-step cyclic processes scheduling

    DEFF Research Database (Denmark)

    Bocewicz, G.; Nielsen, Izabela Ewa; Banaszak, Z.

    2013-01-01

    Automated Guided Vehicles (AGVs) fleet scheduling is one of the big problems in Flexible Manufacturing System (FMS) control. The problem is more complicated when concurrent multi-product manufacturing and resource deadlock avoidance policies are considered. The objective of the research is to pro......Automated Guided Vehicles (AGVs) fleet scheduling is one of the big problems in Flexible Manufacturing System (FMS) control. The problem is more complicated when concurrent multi-product manufacturing and resource deadlock avoidance policies are considered. The objective of the research...... is to provide a declarative model enabling to state a constraint satisfaction problem aimed at AGVs fleet scheduling subject to assumed itineraries of concurrently manufactured product types. In other words, assuming a given layout of FMS’s material handling and production routes of simultaneously manufactured...... orders, the main objective is to provide the declarative framework aimed at conditions allowing one to calculate the AGVs fleet schedule in online mode. An illustrative example of the relevant algebra-like driven step-by-stem cyclic scheduling is provided....

  14. Interoceanic canal excavation scheduling via computer simulation

    International Nuclear Information System (INIS)

    Baldonado, Orlino C.

    1970-01-01

    The computer simulation language GPSS/360 was used to simulate the schedule of several nuclear detonation programs for the interoceanic canal project. The effects of using different weather restriction categories due to air blast and fallout were investigated. The effect of increasing the number of emplacement and stemming crews and the effect of varying the reentry period after detonating a row charge or salvo were also studied. Detonation programs were simulated for the proposed Routes 17A and 25E. The study demonstrates the method of using computer simulation so that a schedule and its associated constraints can be assessed for feasibility. Since many simulation runs can be made for a given set of detonation program constraints, one readily obtains an average schedule for a range of conditions. This provides a method for analyzing time-sensitive operations so that time and cost-effective operational schedules can be established. A comparison of the simulated schedules with those that were published shows them to be similar. (author)

  15. Peak power ratio generator

    Science.gov (United States)

    Moyer, R.D.

    A peak power ratio generator is described for measuring, in combination with a conventional power meter, the peak power level of extremely narrow pulses in the gigahertz radio frequency bands. The present invention in a preferred embodiment utilizes a tunnel diode and a back diode combination in a detector circuit as the only high speed elements. The high speed tunnel diode provides a bistable signal and serves as a memory device of the input pulses for the remaining, slower components. A hybrid digital and analog loop maintains the peak power level of a reference channel at a known amount. Thus, by measuring the average power levels of the reference signal and the source signal, the peak power level of the source signal can be determined.

  16. 78 FR 21818 - Schedules of Controlled Substances: Placement of Methylone Into Schedule I

    Science.gov (United States)

    2013-04-12

    ..., methamphetamine, and MDMA, Schedule I and II substances. These effects included elevated body temperature... of reuptake of monoamines, and in vivo studies (microdialysis, locomotor activity, body temperature.... Yet another commenter claimed that Schedule I placement would ``cripple efforts at learning,'' make it...

  17. Parents' Family Time and Work Schedules: The Split-Shift Schedule in Spain

    NARCIS (Netherlands)

    Gracia, P.; Kalmijn, M.

    2016-01-01

    This study used data on couples from the 2003 Spanish Time Use Survey (N = 1,416) to analyze how work schedules are associated with family, couple, parent–child, and non-family leisure activities. Spain is clearly an interesting case for the institutionalized split-shift schedule, a long lunch break

  18. A master surgical scheduling approach for cyclic scheduling in operating room departments

    NARCIS (Netherlands)

    van Oostrum, Jeroen M.; van Houdenhoven, M.; Hurink, Johann L.; Hans, Elias W.; Wullink, Gerhard; Kazemier, G.

    This paper addresses the problem of operating room (OR) scheduling at the tactical level of hospital planning and control. Hospitals repetitively construct operating room schedules, which is a time-consuming, tedious, and complex task. The stochasticity of the durations of surgical procedures

  19. A model for generating master surgical schedules to allow cyclic scheduling in operating room departments

    NARCIS (Netherlands)

    van Oostrum, J.M.; van Houdenhoven, M.; Hurink, Johann L.; Hans, Elias W.; Wullink, Gerhard; Kazemier, G.

    2005-01-01

    This paper addresses the problem of operating room scheduling at the tactical level of hospital planning and control. Hospitals repetitively construct operating room schedules, which is a time consuming tedious and complex task. The stochasticity of the durations of surgical procedures complicates

  20. Development of [⁶⁴Cu]-DOTA-PR81 radioimmunoconjugate for MUC-1 positive PET imaging.

    Science.gov (United States)

    Alirezapour, Behrouz; Rasaee, Mohammad Javad; Jalilian, Amir Reza; Rajabifar, Saeed; Mohammadnejad, Javad; Paknejad, Malihe; Maadi, Ehsan; Moradkhani, Sedigheh

    2016-01-01

    Breast cancer radioimmunoscintigraphy targeting MUC1 expression is a growing field of work in nuclear medicine research. PR81 is a monoclonal antibody that binds with high affinity to MUC1, which is over expressed on breast tumors. In this study, we report production, quality control and preclinical qualifications of a copper-64 labeled PR81 for PET imaging of breast cancer. PR81 was conjugated with DOTA-NHS-ester and purified by molecular filtration followed by chelate:mAb ratio determination by spectrophotometric method. DOTA-PR81 was labeled with (64)Cu followed by radiochemical purity, in vitro stability, in vitro internalization and immunoreactivity determination. The tissue biodistribution of the (64)Cu-DOTA-PR81 and (64)Cu-DOTA-hIgG was evaluated in BALB/c mice with breast carcinoma tumors using tissue counting and imaging. The radiochemical purity of radioimmunoconjugate was >95±1.9% (ITLC) (specific activity; 4.6 μCi/μg). The average number of chelators per antibody was 3.4±0.3:1. The (64)Cu-DOTA-PR81 showed immunoreactivity towards MUC1 antigen and MCF7 cell line with significant in vitro stability (>89% in PBS and 78±0.5% in human serum) over 48 h. Maximum internalized activity of radiolabeled PR81 in 4-8 h was 81.5%. The biodistribution and scintigraphy studies showed the accumulation of the complex at the site of tumors with high sensitivity and specificity compared to control probes. The results showed that (64)Cu-DOTA-PR81 may be considered as a potential PET tracer for diagnosis and follow-up of MUC1 expression in oncology. Copyright © 2015 Elsevier Inc. All rights reserved.

  1. 14 CFR 399.81 - Unrealistic or deceptive scheduling.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 4 2010-01-01 2010-01-01 false Unrealistic or deceptive scheduling. 399.81... Unrealistic or deceptive scheduling. (a) It is the policy of the Board to consider unrealistic scheduling of... to the advertising of scheduled performance, it is the policy of the Board to regard as an unfair or...

  2. Evaluating the impact of prioritization of antiretroviral pre-exposure prophylaxis (PrEP) in New York City

    Science.gov (United States)

    Kessler, Jason; Myers, Julie E.; Nucifora, Kimberly A.; Mensah, Nana; Toohey, Christopher; Khademi, Amin; Cutler, Blayne; Braithwaite, R. Scott

    2015-01-01

    Objective To compare the value and effectiveness of different prioritization strategies of pre-exposure prophylaxis (PrEP) in New York City (NYC). Design Mathematical modeling utilized as clinical trial is not feasible. Methods Using a model accounting for both sexual and parenteral transmission of HIV we compare different prioritization strategies (PPS) for PrEP to two scenarios—no PrEP and PrEP for all susceptible at-risk individuals. The PPS included PrEP for all MSM, only high-risk MSM, high-risk heterosexuals, and injection drug users, and all combinations of these four strategies. Outcomes included HIV infections averted, and incremental cost effectiveness (per-infection averted) ratios. Initial assumptions regarding PrEP included a 44% reduction in HIV transmission, 50% uptake in the prioritized population and an annual cost per person of $9,762. Sensitivity analyses on key parameters were conducted. Results Prioritization to all MSM results in a 19% reduction in new HIV infections. Compared to PrEP for all persons at-risk this PPS retains 79% of the preventative effect at 15% of the total cost. PrEP prioritized to only high-risk MSM results in a reduction in new HIV infections of 15%. This PPS retains 60% of the preventative effect at 6% of the total cost. There are diminishing returns when PrEP utilization is expanded beyond this group. Conclusions PrEP implementation is relatively cost-inefficient under our initial assumptions. Our results suggest that PrEP should first be promoted among MSM who are at particularly high-risk of HIV acquisition. Further expansion beyond this group may be cost-effective, but is unlikely to be cost-saving. PMID:25493594

  3. An introduction to optimal satellite range scheduling

    CERN Document Server

    Vázquez Álvarez, Antonio José

    2015-01-01

    The satellite range scheduling (SRS) problem, an important operations research problem in the aerospace industry consisting of allocating tasks among satellites and Earth-bound objects, is examined in this book. SRS principles and solutions are applicable to many areas, including: Satellite communications, where tasks are communication intervals between sets of satellites and ground stations Earth observation, where tasks are observations of spots on the Earth by satellites Sensor scheduling, where tasks are observations of satellites by sensors on the Earth. This self-contained monograph begins with a structured compendium of the problem and moves on to explain the optimal approach to the solution, which includes aspects from graph theory, set theory, game theory and belief networks. This book is accessible to students, professionals and researchers in a variety of fields, including: operations research, optimization, scheduling theory, dynamic programming and game theory. Taking account of the distributed, ...

  4. Optimal Scheduling of Domestic Appliances via MILP

    Directory of Open Access Journals (Sweden)

    Zdenek Bradac

    2014-12-01

    Full Text Available This paper analyzes a consumption scheduling mechanism for domestic appliances within a home area network. The aim of the proposed scheduling is to minimize the total energy price paid by the consumer and to reduce power peaks in order to achieve a balanced daily load schedule. An exact and computationally efficient mixed-integer linear programming (MILP formulation of the problem is presented. This model is verified by several problem instances. Realistic scenarios based on the real price tariffs commercially available in the Czech Republic are calculated. The results obtained by solving the optimization problem are compared with a simulation of the ripple control service currently used by many domestic consumers in the Czech Republic.

  5. Schedule and staffing of a nuclear power project

    International Nuclear Information System (INIS)

    Polliart, A.J.; Csik, B.

    1977-01-01

    Establishment of construction schedule: a) preliminary construction schedule; b) PERT (Program Evaluation Review Techniques) analytical method; c) identify key milestone target dates; d) inter-action by participants and contribution to support revised construction schedule. - Construction schedule control: a) ability to update and modify construction schedule; b) alternate plans to circumvent restraints (problems); c) critical path activity-controls; d) continuous review and report system. - Updating construction site reports to include: 1) progress, 2) accomplishments, 3) potential problems and alternate plans; b) progress reports on related support services; c) total assessment of participating groups on schedule; d) information required by management for decisions. - Typical causes for delays in project schedule. (orig.) [de

  6. Influence of intravenous self-administered psychomotor stimulants on performance of rhesus monkeys in a multiple schedule paradigm.

    Science.gov (United States)

    Hoffmeister, F

    1980-01-01

    Rhesus monkeys were trained to complete three multiple schedules. The schedules consisted of three components: a fixed interval (component 1), a variable interval (component 2), and a fixed ratio (component 3). During components 1 and 2, pressing lever 1 was always reinforced by food delivery. During component 3, pressing lever 2 resulted in either food delivery or intravenous infusions of saline solution, solutions of cocaine, of d-amphetamine, of phenmetrazine, or fenetylline. In schedule I, animals were presented with all three components independent of key-pressing behavior during components 1 and 2. In schedule II the availability of component 2 was dependent on completion of component 1. Component 3 was made available only on completion of component 2. Noncompletion of components 1 or 2 resulted in time-out of 15 and 10 min, respectively. Schedule III was identical with schedule II, except that in schedule III the completion of components was indicated only by a change in the lever lights. The influence of self-administered drugs on behavior in all three components was evaluated. Self-administration of psychomotor stimulants impaired the performance of animals and delayed completion of components 1 and 2 of schedules I, II, and III. The effects on behavior were similar with low drug intake in schedule III, moderate intake in schedule II, and high drug intake in schedule I. These effects were strong with self-administration of phenmetrazine, moderate with self-administration of cocaine and d-amphetamine, and weak with self-administration of fenetylline.

  7. E-PR technologies in political party activities

    OpenAIRE

    Tereshchuk Vitaliy Ivanovych

    2016-01-01

    The article discusses the role of the Internet as an important communicative tool in the field of political PR. The article reviews the characteristics of PR-activities on the Internet and the features of e-PR in the political sphere. Particular attention is paid to the system of political party’s e-PR tools.

  8. Flowshop Scheduling Problems with a Position-Dependent Exponential Learning Effect

    Directory of Open Access Journals (Sweden)

    Mingbao Cheng

    2013-01-01

    Full Text Available We consider a permutation flowshop scheduling problem with a position-dependent exponential learning effect. The objective is to minimize the performance criteria of makespan and the total flow time. For the two-machine flow shop scheduling case, we show that Johnson’s rule is not an optimal algorithm for minimizing the makespan given the exponential learning effect. Furthermore, by using the shortest total processing times first (STPT rule, we construct the worst-case performance ratios for both criteria. Finally, a polynomial-time algorithm is proposed for special cases of the studied problem.

  9. Crane Scheduling for a Plate Storage

    DEFF Research Database (Denmark)

    Hansen, Jesper; Clausen, Jens

    2002-01-01

    Odense Steel Shipyard produces the worlds largest container ships. The first process of producing the steel ships is handling arrival and storage of steel plates until they are needed in production. This paper considers the problem of scheduling two cranes that carry out the movements of plates...... into, around and out of the storage. The system is required to create a daily schedule for the cranes, but also handle possible disruptions during the execution of the plan. The problem is solved with a Simulated Annealing algorithm....

  10. Autonomous scheduling technology for Earth orbital missions

    Science.gov (United States)

    Srivastava, S.

    1982-01-01

    The development of a dynamic autonomous system (DYASS) of resources for the mission support of near-Earth NASA spacecraft is discussed and the current NASA space data system is described from a functional perspective. The future (late 80's and early 90's) NASA space data system is discussed. The DYASS concept, the autonomous process control, and the NASA space data system are introduced. Scheduling and related disciplines are surveyed. DYASS as a scheduling problem is also discussed. Artificial intelligence and knowledge representation is considered as well as the NUDGE system and the I-Space system.

  11. Scheduling projects with multiskill learning effect.

    Science.gov (United States)

    Zha, Hong; Zhang, Lianying

    2014-01-01

    We investigate the project scheduling problem with multiskill learning effect. A new model is proposed to deal with the problem, where both autonomous and induced learning are considered. In order to obtain the optimal solution, a genetic algorithm with specific encoding and decoding schemes is introduced. A numerical example is used to illustrate the proposed model. The computational results show that the learning effect cannot be neglected in project scheduling. By means of determining the level of induced learning, the project manager can balance the project makespan with total cost.

  12. Anesthesiology Nurse Scheduling using Particle Swarm Optimization

    Directory of Open Access Journals (Sweden)

    Leopoldo Altamirano

    2012-02-01

    Full Text Available In this article we present an approach designed to solve a real world problem: the Anesthesiology Nurse Scheduling Problem (ANSP at a public French hospital. The anesthesiology nurses are one of the most shared resources in the hospital and we attempt to find a fair/balanced schedule for them, taking into account a set of constraints and the nursesarsquo; stated preferences, concerning the different shifts. We propose a particle swarm optimization algorithm to solve the ANSP. Finally, we compare our technique with previous results obtained using integer programming.

  13. Real-time systems scheduling 2 focuses

    CERN Document Server

    Chetto, Maryline

    2014-01-01

    Real-time systems are used in a wide range of applications, including control, sensing, multimedia, etc. Scheduling is a central problem for these computing/communication systems since it is responsible for software execution in a timely manner. This book, the second of two volumes on the subject, brings together knowledge on specific topics and discusses the recent advances for some of them.  It addresses foundations as well as the latest advances and findings in real-time scheduling, giving comprehensive references to important papers, but the chapters are short and not overloaded with co

  14. Optimal scheduling of coproduction with a storage

    International Nuclear Information System (INIS)

    Ravn, H.F.; Rygard, J.M.

    1993-02-01

    We consider the problem of optimal scheduling of a system with combined heat and heat (CHP) units and a heat storege. The purpose of the heat storage is to permit a partial decoupling of the variations in the demand for heat and electrical power. We formulate the problem of optimal scheduling as that of minimizing the total costs over the planning period. The heat demand from the district heating system and the ''shadow prices'' for the electrical power system are taken as externally given parameters. The resulting model is solved by dynamic programming. We describe implementation details and we give examples of result of the optimization. (au) (12 refs.)

  15. Long-term home care scheduling

    DEFF Research Database (Denmark)

    Gamst, Mette; Jensen, Thomas Sejr

    In several countries, home care is provided for certain citizens living at home. The long-term home care scheduling problem is to generate work plans spanning several days such that a high quality of service is maintained and the overall cost is kept as low as possible. A solution to the problem...... provides detailed information on visits and visit times for each employee on each of the covered days. We propose a branch-and-price algorithm for the long-term home care scheduling problem. The pricing problem generates one-day plans for an employee, and the master problem merges the plans with respect...

  16. Real-time systems scheduling fundamentals

    CERN Document Server

    Chetto, Maryline

    2014-01-01

    Real-time systems are used in a wide range of applications, including control, sensing, multimedia, etc.  Scheduling is a central problem for these computing/communication systems since responsible of software execution in a timely manner. This book provides state of knowledge in this domain with special emphasis on the key results obtained within the last decade. This book addresses foundations as well as the latest advances and findings in Real-Time Scheduling, giving all references to important papers. But nevertheless the chapters will be short and not overloaded with confusing details.

  17. The Liquidity Coverage Ratio: the need for further complementary ratios?

    OpenAIRE

    Ojo, Marianne

    2013-01-01

    This paper considers components of the Liquidity Coverage Ratio – as well as certain prevailing gaps which may necessitate the introduction of a complementary liquidity ratio. The definitions and objectives accorded to the Liquidity Coverage Ratio (LCR) and Net Stable Funding Ratio (NSFR) highlight the focus which is accorded to time horizons for funding bank operations. A ratio which would focus on the rate of liquidity transformations and which could also serve as a complementary metric gi...

  18. PrP N-terminal domain triggers PrPSc-like aggregation of Dpl

    International Nuclear Information System (INIS)

    Erlich, Paul; Cesbron, Jean-Yves; Lemaire-Vieille, Catherine; Curt, Aurelie; Andrieu, Jean-Pierre; Schoehn, Guy; Jamin, Marc; Gagnon, Jean

    2008-01-01

    Transmissible spongiform encephalopathies are fatal neurodegenerative disorders thought to be transmitted by self-perpetuating conformational conversion of a neuronal membrane glycoprotein (PrP C , for 'cellular prion protein') into an abnormal state (PrP Sc , for 'scrapie prion protein'). Doppel (Dpl) is a protein that shares significant biochemical and structural homology with PrP C . In contrast to its homologue PrP C , Dpl is unable to participate in prion disease progression or to achieve an abnormal PrP Sc -like state. We have constructed a chimeric mouse protein, composed of the N-terminal domain of PrP C (residues 23-125) and the C-terminal part of Dpl (residues 58-157). This chimeric protein displays PrP-like biochemical and structural features; when incubated in presence of NaCl, the α-helical monomer forms soluble β-sheet-rich oligomers which acquire partial resistance to pepsin proteolysis in vitro, as do PrP oligomers. Moreover, the presence of aggregates akin to protofibrils is observed in soluble oligomeric species by electron microscopy

  19. Tips for the PR Chairman for Education Associations. PR Bookshelf No. 2.

    Science.gov (United States)

    National Education Association, Washington, DC.

    This booklet is intended to aid leaders of local education associations in developing a continuing public relations (PR) program aimed at establishing and maintaining a favorable public image for teachers. Although it offers useful guidelines for developing a PR program, the booklet does not contain lists of specific things to do. Instead, it…

  20. La préservation, atout essentiel pour contrer la précarité des ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    La préservation, atout essentiel pour contrer la précarité des moyens de subsistance en ... Union mondiale pour la conservation de la nature et des ressources ... la recherche menée dans les domaines des sciences sociales, des sciences ...

  1. Electronic absorption spectral studies of Pr(III) chelates with some amino acids

    Science.gov (United States)

    Kachhawa, Chanchal; Solanki, Kanika; Bhandari, H. S.

    2018-05-01

    Investigations on Pr(III) systems with 1:1 metal-ligand stoichiometric ratio have been carried out in different solvents. β - Alanine, Taurine and anthranilic acid have been opted as ligands for the investigations. The Study is based on doped crystal phenomenon. The Slater-Condon, spin-orbit, nephelauxetic, bonding, Racah and Judd-Ofelt parameters have been explored during the study. Four bands for Pr(III) have been observed and recorded in the region 350 nm to 900nm. Partial regression method has been used for calculations. Use of computational chemistry has been explored in order to develop better and easier methods of calculations.

  2. Departure Queue Prediction for Strategic and Tactical Surface Scheduler Integration

    Science.gov (United States)

    Zelinski, Shannon; Windhorst, Robert

    2016-01-01

    A departure metering concept to be demonstrated at Charlotte Douglas International Airport (CLT) will integrate strategic and tactical surface scheduling components to enable the respective collaborative decision making and improved efficiency benefits these two methods of scheduling provide. This study analyzes the effect of tactical scheduling on strategic scheduler predictability. Strategic queue predictions and target gate pushback times to achieve a desired queue length are compared between fast time simulations of CLT surface operations with and without tactical scheduling. The use of variable departure rates as a strategic scheduler input was shown to substantially improve queue predictions over static departure rates. With target queue length calibration, the strategic scheduler can be tuned to produce average delays within one minute of the tactical scheduler. However, root mean square differences between strategic and tactical delays were between 12 and 15 minutes due to the different methods the strategic and tactical schedulers use to predict takeoff times and generate gate pushback clearances. This demonstrates how difficult it is for the strategic scheduler to predict tactical scheduler assigned gate delays on an individual flight basis as the tactical scheduler adjusts departure sequence to accommodate arrival interactions. Strategic/tactical scheduler compatibility may be improved by providing more arrival information to the strategic scheduler and stabilizing tactical scheduler changes to runway sequence in response to arrivals.

  3. Pr-magnetism in the quasi-skutterudite compound PrFe2Al8.

    Science.gov (United States)

    Nair, Harikrishnan S; Ogunbunmi, Michael O; Kumar, C M N; Adroja, D T; Manuel, P; Fortes, D; Taylor, J; Strydom, A M

    2017-08-31

    The intermetallic compound PrFe 2 Al 8 that possesses a three-dimensional network structure of Al polyhedra centered at the transition metal element Fe and the rare earth Pr is investigated through neutron powder diffraction and inelastic neutron scattering in order to elucidate the magnetic ground state of Pr and Fe and the crystal field effects of Pr. Our neutron diffraction study confirms long-range magnetic order of Pr below [Formula: see text] K in this compound. Subsequent magnetic structure estimation reveals a magnetic propagation vector [Formula: see text] with a magnetic moment value of [Formula: see text]/Pr along the orthorhombic c-axis and evidence the lack of ordering in the Fe sublattice. The inelastic neutron scattering study reveals one crystalline electric field excitation near 19 meV at 5 K in PrFe 2 Al 8 . The energy-integrated intensity of the 19 meV excitation as a function of [Formula: see text] follows the square of the magnetic form factor of [Formula: see text] thereby confirming that the inelastic excitation belongs to the Pr sublattice. The second sum rule applied to the dynamic structure factor indicates only 1.6(2) [Formula: see text] evolving at the 19 meV peak compared to the 3.58 [Formula: see text] for free [Formula: see text], indicating that the crystal field ground state is magnetic and the missing moment is associated with the resolution limited quasi-elastic line. The magnetic order occurring in Pr in PrFe 2 Al 8 is counter-intuitive to the symmetry-allowed crystal field level scheme, hence, is suggestive of exchange-mediated mechanisms of ordering stemming from the magnetic ground state of the crystal field levels.

  4. 75 FR 44847 - Proposed Collection; Comment Request for Forms 943, 943-PR, 943-A, and 943A-PR

    Science.gov (United States)

    2010-07-29

    ... 943, 943-PR, 943- A, and 943A-PR AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice and... comments concerning Forms 943, Employer's Annual Tax Return for Agricultural Employees, 943-PR, Planilla..., Agricultural Employer's Record of Federal Tax Liability, and 943A-PR, Registro De La Obligacion Contributiva...

  5. 78 FR 47051 - Proposed Collection; Comment Request for Forms 943, 943-PR, 943-A, and 943A-PR

    Science.gov (United States)

    2013-08-02

    ... 943, 943-PR, 943- A, and 943A-PR AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice and..., 943-PR, Planilla Para La Declarcion Anual De La Contribucion Federal Del Patrono De Empleados Agricolas, 943-A, Agricultural Employer's Record of Federal Tax Liability, and 943A-PR, Registro De La...

  6. Estimation of Daily Proteinuria in Patients with Amyloidosis by Using the Protein-To-Creatinine ratio in Random Urine Samples.

    Science.gov (United States)

    Talamo, Giampaolo; Mir Muhammad, A; Pandey, Manoj K; Zhu, Junjia; Creer, Michael H; Malysz, Jozef

    2015-02-11

    Measurement of daily proteinuria in patients with amyloidosis is recommended at the time of diagnosis for assessing renal involvement, and for monitoring disease activity. Renal involvement is usually defined by proteinuria >500 mg/day. We evaluated the accuracy of the random urine protein-to-creatinine ratio (Pr/Cr) in predicting 24 hour proteinuria in patient with amyloidosis. We compared results of random urine Pr/Cr ratio and concomitant 24-hour urine collections in 44 patients with amyloidosis. We found a strong correlation (Spearman's ρ=0.874) between the Pr/Cr ratio and the 24 hour urine protein excretion. For predicting renal involvement, the optimal cut-off point of the Pr/Cr ratio was 715 mg/g. The sensitivity and specificity for this point were 91.8% and 95.5%, respectively, and the area under the curve value was 97.4%. We conclude that the random urine Pr/Cr ratio could be useful in the screening of renal involvement in patients with amyloidosis. If validated in a prospective study, the random urine Pr/Cr ratio could replace the 24 hour urine collection for the assessment of daily proteinuria and presence of nephrotic syndrome in patients with amyloidosis.

  7. Estimation of daily proteinuria in patients with amyloidosis by using the protein-to-creatinine ratio in random urine sample

    Directory of Open Access Journals (Sweden)

    Giampaolo Talamo

    2015-02-01

    Full Text Available Measurement of daily proteinuria in patients with amyloidosis is recommended at the time of diagnosis for assessing renal involvement, and for monitoring disease activity. Renal involvement is usually defined by proteinuria >500 mg/day. We evaluated the accuracy of the random urine protein-to-creatinine ratio (Pr/Cr in predicting 24 hour proteinuria in patient with amyloidosis. We com- pared results of random urine Pr/Cr ratio and concomitant 24-hour urine collections in 44 patients with amyloidosis. We found a strong correlation (Spearman’s ρ=0.874 between the Pr/Cr ratio and the 24 hour urine protein excretion. For predicting renal involvement, the optimal cut-off point of the Pr/Cr ratio was 715 mg/g. The sensitivity and specificity for this point were 91.8% and 95.5%, respectively, and the area under the curve value was 97.4%. We conclude that the random urine Pr/Cr ratio could be useful in the screening of renal involvement in patients with amyloidosis. If validated in a prospective study, the random urine Pr/Cr ratio could replace the 24 hour urine collection for the assessment of daily proteinuria and presence of nephrotic syndrome in patients with amyloidosis.

  8. Risk of mortality of node-negative, ER/PR/HER2 breast cancer subtypes in T1, T2, and T3 tumors.

    Science.gov (United States)

    Parise, Carol A; Caggiano, Vincent

    2017-10-01

    The purpose of this study was to assess differences in breast cancer-specific mortality within tumors of the same size when breast cancer was defined using the three tumor markers estrogen receptor (ER), progesterone receptor (PR), and human epidermal growth factor receptor 2 (HER2). We identified 104,499 cases of node-negative primary female invasive breast cancer from the California Cancer Registry. Tumor size was categorized as T1a, T1b, T1c, T2, and T3. Breast cancer was defined using ER, PR, and HER2. Kaplan-Meier Survival analysis was conducted and Cox Regression was used to compute the adjusted risk of mortality for the ER+/PR+/HER2+, ER-/PR-/HER2- (TNBC), and ER-/PR-/HER2+ (HER2-overexpressing) subtypes when compared with the ER+/PR+/HER2-. Separate models were computed for each tumor size. Unadjusted survival analysis showed that for all tumor sizes, the ER+/PR+ subtypes regardless of HER status have better breast cancer-specific survival than ER-/PR- subtypes. Subtype was not an important factor for risk of mortality for T1a tumors. The ER+/PR+/HER2+ subtype was only a risk for mortality in T1b tumors that were unadjusted for treatment. For all other tumor sizes, the ER+/PR+/HER2+ had the same mortality as the ER+/PR+/HER2- subtype regardless of adjustment for treatment. The HER2-overexpressing subtype had a higher risk of mortality than the ER+/PR+/HER2- subtype except for T1b tumors that were adjusted for treatment. For all tumor sizes, the TNBC had higher hazard ratios than all other subtypes. T1a tumors have the same risk of mortality regardless of ER/PR/HER2 subtype, and ER and PR negativity plays a stronger role in survival than HER2 positivity for tumors of all size.

  9. Energy Profit Ratio Compared

    International Nuclear Information System (INIS)

    Amano, Osamu

    2007-01-01

    We need more oil energy to take out oil under the ground. Limit resources make us consider other candidates of energy source instead of oil. Electricity shall be the main role more and more like electric vehicles and air conditioners so we should consider electricity generation ways. When we consider what kind of electric power generation is the best or suitable, we should not only power generation plant but whole process from mining to power generation. It is good way to use EPR, Energy Profit Ratio, to analysis which type is more efficient and which part is to do research and development when you see the input breakdown analysis. Electricity by the light water nuclear power plant, the hydrogen power plant and the geothermal power plant are better candidates from EPR analysis. Forecasting the world primly energy supply in 2050, it is said that the demand will be double of the demand in 2000 and the supply will not be able to satisfy the demand in 2050. We should save 30% of the demand and increase nuclear power plants 3.5 times more and recyclable energy like hydropower plants 3 times more. When the nuclear power plants are 3.5 times more then uranium peak will come and we will need breed uranium. I will analysis the EPR of FBR. Conclusion: A) the EPR of NPS in Japan is 17.4 and it is the best of all. B) Many countries will introduce new nuclear power plants rapidly may be 3.5 times in 2050. C) Uranium peak will happen around 2050. (author)

  10. Schedule control in Ling Ao nuclear power project

    International Nuclear Information System (INIS)

    Xie Ahai

    2007-01-01

    Ling Ao Nuclear Power Station (LANP) is first one built up by self-reliance in China with power capacity 990x2 MWe. The results of quality control, schedule control and cost control are satisfactory. The commercial operation days of Unit 1 and Unit 2 were 28th May 2002 and 8th Jan. 2003 respectively, which were 48 days and 66 days in advance of the project schedule. This paper presents the practices of self-reliance schedule control system in LANP. The paper includes 10 sections: schedule control system; targets of schedule control; schedule control at early stage of project; construction schedule; scheduling practice; Point curves; schedule control of design and procurement; a good practice of construction schedule control on site; commissioning and startup schedule; schedule control culture. Three figures are attached. The main contents of the self-reliance schedule control system are as follows: to draw up reasonable schedules and targets; to setup management mechanism and procedures; to organize powerful project management team; to establish close monitoring system; to provide timely progress reports and statistics information. Five kinds of schedule control targets are introduced, i.e. bar-chart schedule; milesones; Point curves; interface management; hydraulic test schedule of auxiliary piping loops; EMR/EMC/EESR issuance schedules. Six levels of bar-chart schedules were adopted in LANP, but the bar-chart schedules were not satisfactory for complicated erection condition on site, even using six levels of schedules. So a kind of Point curves was developed and their advantages are explained. Scheduling method of three elements: activity, duration, logic, which was adopted in LANP, is introduced. The duration of each piping activities in LANP level 2 project schedule was calculated based on the relevant working Point quantities. The analysis and adjustment of Point curves are illustrated, i.e. balance of monthly quantities; possible production in the peakload

  11. Online Scheduling in Distributed Message Converter Systems

    NARCIS (Netherlands)

    Risse, Thomas; Wombacher, Andreas; Surridge, Mike; Taylor, Steve; Aberer, Karl

    The optimal distribution of jobs among hosts in distributed environments is an important factor to achieve high performance. The optimal strategy depends on the application. In this paper we present a new online scheduling strategy for distributed EDI converter system. The strategy is based on the

  12. Crane Scheduling on a Plate Storage

    DEFF Research Database (Denmark)

    Hansen, Jesper

    2002-01-01

    OSS produces the worlds largest container ships. The first process of producing the steel ships is handling arrival and storage of steel plates until they are needed in production. Two gantry cranes carry out this task. The planning task is now to create a schedule of movements for the 2 cranes...

  13. Improved human performance through appropriate work scheduling

    International Nuclear Information System (INIS)

    Morisseau, D.S.; Lewis, P.M.; Persensky, J.J.

    1987-01-01

    The Nuclear Regulatory Commission (NRC) has had a policy, Generic Letter 82-12, on hours of work since 1982. The policy states that licensees should establish controls to prevent situations where fatigue could reduce the ability of operating personnel to perform their duties safely (USNRC 1982). While that policy does give guidance on hours of work and overtime, it does not address periods of longer than 7 days or work schedules other than the routine 8-hour day, 40-hour week. Recognizing that NRC policy could provide broader guidance for shift schedules and hours of overtime work, the Division of Human Factors Safety conducted a project with Pacific Northwest Laboratories (PNL) to help the NRC better understand the human factors principles and issues concerning hours of work so that the NRC could consider updating their policy as necessary. The results of this project are recommendations for guidelines and limits for periods of 14 days, 28 days, and 1 year to take into account the cumulative effects of fatigue. In addition, routine 12-hour shifts are addressed. This latter type of shift schedule has been widely adopted in the petroleum and chemical industries and several utilities operating nuclear power plants have adopted it as well. Since this is the case, it is important to consider including guidelines for implementing this type of schedule. This paper discusses the bases for the PNL recommendations which are currently being studied by the NRC

  14. ATD-2 Surface Scheduling and Metering Concept

    Science.gov (United States)

    Coppenbarger, Richard A.; Jung, Yoon Chul; Capps, Richard Alan; Engelland, Shawn A.

    2017-01-01

    This presentation describes the concept of ATD-2 tactical surface scheduling and metering. The concept is composed of several elements, including data exchange and integration; surface modeling; surface scheduling; and surface metering. The presentation explains each of the elements. Surface metering is implemented to balance demand and capacity• When surface metering is on, target times from surface scheduler areconverted to advisories for throttling demand• Through the scheduling process, flights with CTOTs will not get addedmetering delay (avoids potential for ‘double delay’)• Carriers can designate certain flights as exempt from metering holds• Demand throttle in Phase 1 at CLT is through advisories sent to rampcontrollers for pushback instructions to the flight deck– Push now– Hold for an advised period of time (in minutes)• Principles of surface metering can be more generally applied to otherairports in the NAS to throttle demand via spot-release times (TMATs Strong focus on optimal use of airport resources• Flexibility enables stakeholders to vary the amount of delay theywould like transferred to gate• Addresses practical aspects of executing surface metering in aturbulent real world environment• Algorithms designed for both short term demand/capacityimbalances (banks) or sustained metering situations• Leverage automation to enable surface metering capability withoutrequiring additional positions• Represents first step in Tactical/Strategic fusion• Provides longer look-ahead calculations to enable analysis ofstrategic surface metering potential usage

  15. Irrigation scheduling using soil moisture sensors

    Science.gov (United States)

    Soil moisture sensors were evaluated and used for irrigation scheduling in humid region. Soil moisture sensors were installed in soil at depths of 15cm, 30cm, and 61cm belowground. Soil volumetric water content was automatically measured by the sensors in a time interval of an hour during the crop g...

  16. Quarterly report on program cost and schedule

    International Nuclear Information System (INIS)

    1989-07-01

    This report is intended to provide a summary of the cost and schedule performance for the Civilian Radioactive Waste Management Program. Performance data are presented for each of the major program elements. Also included in this report is the status of the Nuclear Waste Fund revenues and disbursements. This report includes project performance data reported through March 1989

  17. Schedule reconciliation tests for management prudency determination

    International Nuclear Information System (INIS)

    Howell, G.E.

    1986-01-01

    The prudency audit of a nuclear project involves engineering, construction, financial, and management dimensions. The audit must retrospectively evaluate the decisions and actions of management decision makers and then equitably allocate the cost impacts of those decisions and actions in a comprehensive and objective manner. In most situations, determination of the impact of schedule delays is a paramount issue. Manzi and Associates uses an approach to schedule reconciliation that focuses on the site-specific, as-built condition. The as-built schedule model is analyzed by a backward pass, or but-for methodology which focuses on the causes and impacts of identified delays. The objective is to demonstrate that but-for the identified delay, the project could have been built in the as-planned time frame. The but-for methodology has been used in many contract dispute cases and is currently being applied to schedule reconciliation on several nuclear plants. The potential for applying this methodology to both new construction and retrofit projects is great

  18. Algorithms for Scheduling and Network Problems

    Science.gov (United States)

    1991-09-01

    time. We already know, by Lemma 2.2.1, that WOPT = O(log( mpU )), so if we could solve this integer program optimally we would be done. However, the...Folydirat, 15:177-191, 1982. [6] I.S. Belov and Ya. N. Stolin. An algorithm in a single path operations scheduling problem. In Mathematical Economics and

  19. Flexible Scheduling in Multimedia Kernels: An Overview

    NARCIS (Netherlands)

    Jansen, P.G.; Scholten, Johan; Laan, Rene; Chow, W.S.

    1999-01-01

    Current Hard Real-Time (HRT) kernels have their timely behaviour guaranteed on the cost of a rather restrictive use of the available resources. This makes current HRT scheduling techniques inadequate for use in a multimedia environment where we can make a considerable profit by a better and more

  20. Maximizing System Lifetime by Battery Scheduling

    NARCIS (Netherlands)

    Jongerden, M.R.; Haverkort, Boudewijn R.H.M.; Bohnenkamp, H.C.; Katoen, Joost P.

    2009-01-01

    The use of mobile devices is limited by the battery lifetime. Some devices have the option to connect an extra battery, or to use smart battery-packs with multiple cells to extend the lifetime. In these cases, scheduling the batteries over the load to exploit recovery properties usually extends the

  1. Cost-efficient scheduling of FAST observations

    Science.gov (United States)

    Luo, Qi; Zhao, Laiping; Yu, Ce; Xiao, Jian; Sun, Jizhou; Zhu, Ming; Zhong, Yi

    2018-03-01

    A cost-efficient schedule for the Five-hundred-meter Aperture Spherical radio Telescope (FAST) requires to maximize the number of observable proposals and the overall scientific priority, and minimize the overall slew-cost generated by telescope shifting, while taking into account the constraints including the astronomical objects visibility, user-defined observable times, avoiding Radio Frequency Interference (RFI). In this contribution, first we solve the problem of maximizing the number of observable proposals and scientific priority by modeling it as a Minimum Cost Maximum Flow (MCMF) problem. The optimal schedule can be found by any MCMF solution algorithm. Then, for minimizing the slew-cost of the generated schedule, we devise a maximally-matchable edges detection-based method to reduce the problem size, and propose a backtracking algorithm to find the perfect matching with minimum slew-cost. Experiments on a real dataset from NASA/IPAC Extragalactic Database (NED) show that, the proposed scheduler can increase the usage of available times with high scientific priority and reduce the slew-cost significantly in a very short time.

  2. Approximating multi-objective scheduling problems

    NARCIS (Netherlands)

    Dabia, S.; Talbi, El-Ghazali; Woensel, van T.; Kok, de A.G.

    2013-01-01

    In many practical situations, decisions are multi-objective by nature. In this paper, we propose a generic approach to deal with multi-objective scheduling problems (MOSPs). The aim is to determine the set of Pareto solutions that represent the interactions between the different objectives. Due to

  3. Scheduling with time-dependent execution times

    NARCIS (Netherlands)

    Woeginger, G.J.

    1995-01-01

    We consider systems of tasks where the task execution times are time-dependent and where all tasks have some common deadline. We describe how to compute in polynomial time a schedule that minimizes the number of late tasks. This answers a question raised in a recent paper by Ho, Leung and Wei.

  4. FLOWSHOP SCHEDULING USING A NETWORK APPROACH ...

    African Journals Online (AJOL)

    eobe

    time when the last job completes on the last machine. The objective ... more jobs in a permutation flow shop scheduling problem ... processing time of a job on a machine is zero, it ..... hybrid flow shops with sequence dependent setup times ...

  5. Advance Resource Provisioning in Bulk Data Scheduling

    Energy Technology Data Exchange (ETDEWEB)

    Balman, Mehmet

    2012-10-01

    Today?s scientific and business applications generate mas- sive data sets that need to be transferred to remote sites for sharing, processing, and long term storage. Because of increasing data volumes and enhancement in current net- work technology that provide on-demand high-speed data access between collaborating institutions, data handling and scheduling problems have reached a new scale. In this paper, we present a new data scheduling model with ad- vance resource provisioning, in which data movement operations are defined with earliest start and latest comple- tion times. We analyze time-dependent resource assign- ment problem, and propose a new methodology to improve the current systems by allowing researchers and higher-level meta-schedulers to use data-placement as-a-service, so they can plan ahead and submit transfer requests in advance. In general, scheduling with time and resource conflicts is NP-hard. We introduce an efficient algorithm to organize multiple requests on the fly, while satisfying users? time and resource constraints. We successfully tested our algorithm in a simple benchmark simulator that we have developed, and demonstrated its performance with initial test results.

  6. The Growing Diversity of Work Schedules.

    Science.gov (United States)

    Smith, Shirley J.

    1986-01-01

    The author highlights the predominance of the five-day, 40-hour workweek. Although finding little change in recent years in the proportion of workers on 40-hour schedules, Smith notes that there have been some changes in work patterns, with a still small but growing group of workers on "compressed" full-time weeks of less than five days.…

  7. Schedule and status of irradiation experiments

    International Nuclear Information System (INIS)

    Rowcliffe, A.F.; Grossbeck, M.L.; Robertson, J.P.

    1998-01-01

    The current status of reactor irradiation experiments is presented in tables summarizing the experimental objectives, conditions, and schedule. Currently, the program has four irradiation experiments in reactor, and five experiments in the design or construction stages. Postirradiation examination and testing is in progress on ten experiments

  8. 20 CFR 402.165 - Fee schedule.

    Science.gov (United States)

    2010-04-01

    ... requester for the services rendered. (i) Fee for copies of printed materials. When extra copies of printed... 20 Employees' Benefits 2 2010-04-01 2010-04-01 false Fee schedule. 402.165 Section 402.165 Employees' Benefits SOCIAL SECURITY ADMINISTRATION AVAILABILITY OF INFORMATION AND RECORDS TO THE PUBLIC...

  9. Project schedule and cost estimate report

    International Nuclear Information System (INIS)

    1988-03-01

    All cost tables represent obligation dollars, at both a constant FY 1987 level and an estimated escalation level, and are based on the FY 1989 DOE Congressional Budget submittal of December 1987. The cost tables display the total UMTRA Project estimated costs, which include both Federal and state funding. The Total Estimated Cost (TEC) for the UMTRA Project is approximately $992.5 million (in 1987 escalated dollars). Project schedules have been developed that provide for Project completion by September 1994, subject to Congressional approval extending DOE's authorization under Public Law 95-604. The report contains site-specific demographic data, conceptual design assumptions, preliminary cost estimates, and site schedules. A general project overview is also presented, which includes a discussion of the basis for the schedule and cost estimates, contingency assumptions, work breakdown structure, and potential project risks. The schedules and cost estimates will be revised as necessary to reflect appropriate decisions relating to relocation of certain tailings piles, or other special design considerations or circumstances (such as revised EPA groundwater standards), and changes in the Project mission. 27 figs', 97 tabs

  10. Adaptive resource allocation for efficient patient scheduling

    NARCIS (Netherlands)

    Vermeulen, Ivan B.; Bohte, Sander M.; Elkhuizen, Sylvia G.; Lameris, Han; Bakker, Piet J. M.; La Poutré, Han

    2009-01-01

    Efficient scheduling of patient appointments on expensive resources is a complex and dynamic task. A resource is typically used by several patient groups. To service these groups, resource capacity is often allocated per group, explicitly or implicitly. Importantly, due to fluctuations in demand,

  11. 21 CFR 1308.14 - Schedule IV.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 9 2010-04-01 2010-04-01 false Schedule IV. 1308.14 Section 1308.14 Food and... isomers is possible: (1) Fenfluramine 1670 (e) Stimulants. Unless specifically excepted or unless listed... the following substances having a stimulant effect on the central nervous system, including its salts...

  12. 21 CFR 1308.12 - Schedule II.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 9 2010-04-01 2010-04-01 false Schedule II. 1308.12 Section 1308.12 Food and... 9733 (26) Remifentanil 9739 (27) Sufentanil 9740 (28) Tapentadol 9780 (d) Stimulants. Unless... which contains any quantity of the following substances having a stimulant effect on the central nervous...

  13. 21 CFR 1308.11 - Schedule I.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 9 2010-04-01 2010-04-01 false Schedule I. 1308.11 Section 1308.11 Food and Drugs...) Mecloqualone 2572 (3) Methaqualone 2565 (f) Stimulants. Unless specifically excepted or unless listed in... following substances having a stimulant effect on the central nervous system, including its salts, isomers...

  14. 21 CFR 1308.15 - Schedule V.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 9 2010-04-01 2010-04-01 false Schedule V. 1308.15 Section 1308.15 Food and Drugs... not less than 25 micrograms of atropine sulfate per dosage unit. (d) Stimulants. Unless specifically... which contains any quantity of the following substances having a stimulant effect on the central nervous...

  15. Intelligence amplification framework for enhancing scheduling processes

    NARCIS (Netherlands)

    Dobrkovic, Andrej; Liu, Luyao; Iacob, Maria Eugenia; van Hillegersberg, Jos

    2016-01-01

    The scheduling process in a typical business environment consists of predominantly repetitive tasks that have to be completed in limited time and often containing some form of uncertainty. The intelligence amplification is a symbiotic relationship between a human and an intelligent agent. This

  16. Irrigation scheduling with the neutron probe

    International Nuclear Information System (INIS)

    Travers, P.

    1987-01-01

    The operational theory of the neutron probe is briefly outlined and its application and uses discussed in relation to determination of soil compaction and irrigation scheduling. Graphic examples are given of alluvial soil moisture profiles and how this information can be used to improve trickle irrigation in vineyards. 3 refs., 7 figs

  17. Proportional green time scheduling for traffic lights

    NARCIS (Netherlands)

    P. Kovacs; Le, T. (Tung); R. Núñez Queija (Rudesindo); Vu, H. (Hai); N. Walton

    2016-01-01

    textabstractWe consider the decentralized scheduling of a large number of urban traffic lights. We investigate factors determining system performance, in particular, the length of the traffic light cycle and the proportion of green time allocated to each junction. We study the effect of the length

  18. DEVELOPMENT OF A MAINTENANCE SCHEDULING MODEL FOR ...

    African Journals Online (AJOL)

    ... of minor maintenance, for each machine within this time span. In order to minimize the total cost of repairs and production. A numerical application of this development model in a case study is presented. Key words: Maintenance, modeling, scheduling, optimization. [Global Jnl Engineering Res. Vol.1(2) 2002: 107-118] ...

  19. Cross layer scheduling algorithm for LTE Downlink

    DEFF Research Database (Denmark)

    Popovska Avramova, Andrijana; Yan, Ying; Dittmann, Lars

    2012-01-01

    . This paper evaluates a cross layer scheduling algorithm that aims at minimizing the resource utilization. The algorithm makes decisions regarding the channel conditions and the size of transmission buffers and different QoS demands. The simulation results show that the new algorithm improves the resource...

  20. Scheduling drayage operations in synchromodal transport

    NARCIS (Netherlands)

    Rivera, Arturo E.Pérez; Mes, Martijn R.K.; Bektas, Tolga; Coniglio, Stefano; Martinez-Sykora, Antonio; Voss, Stefan

    2017-01-01

    We study the problem of scheduling drayage operations in synchromodal transport. Besides the usual decisions to time the pick-up and delivery of containers, and to route the vehicles that transport them, synchromodal transport includes the assignment of terminals for empty and loaded containers. The

  1. Simultaneous scheduling of machines and mobile robots

    DEFF Research Database (Denmark)

    Dang, Vinh Quang; Nielsen, Izabela Ewa

    2013-01-01

    This paper deals with the problem of simultaneously scheduling machines and a number of autonomous mobile robots in a flexible manufacturing system (FMS). Besides capability of transporting materials between machines, the considered mobile robots are different from other material handling devices...

  2. Flexible job shop scheduling problem in manufacturing

    OpenAIRE

    Curralo, Ana; Pereira, Ana I.; Barbosa, José; Leitão, Paulo

    2013-01-01

    This paper addresses a real assembly cell: the AIP-PRIMECA cell at the Université de Valenciennes et du Hainaut-Cambrésis, in France. This system can be viewed as a Flexible Job Shop, leading to the formulation of a Flexible Job Shop Scheduling Problem (FJSSP).

  3. Implications of Nontraditional Work Schedules for Women

    Science.gov (United States)

    Polit, Denise F.

    1978-01-01

    Issues, evidence, and arguments relating to the effects of alternative working arrangements on the lives of women are examined. Forms of nontraditional schedules which are analyzed include the shortened work week, flexible working hours, and part-time employment. (Author/GC)

  4. Job shop scheduling by local search

    NARCIS (Netherlands)

    Vaessens, R.J.M.; Aarts, E.H.L.; Lenstra, J.K.

    1994-01-01

    We survey solution methods for the job shop scheduling problem with an emphasis on local search. We discuss both cleterministic and randomized local search methods as well as the applied neighborhoods. We compare the computational performance of the various methods in terms of their effectiveness

  5. Scheduling in Engineering, Project, and Production Management

    OpenAIRE

    Chien-Ho Ko

    2015-01-01

    This issue presents five papers selected from the 2013 (4th) International Conference on Engineering, Project, and Production Management (EPPM2013) held in Bangkok, Thailand. Three of the papers deal with scheduling problems faced in project and production management, while the remaining two focus on engineering management issues.

  6. Integrating job scheduling and constrained network routing

    DEFF Research Database (Denmark)

    Gamst, Mette

    2010-01-01

    This paper examines the NP-hard problem of scheduling jobs on resources such that the overall profit of executed jobs is maximized. Job demand must be sent through a constrained network to the resource before execution can begin. The problem has application in grid computing, where a number...

  7. A Comparison of Software Schedule Estimators

    Science.gov (United States)

    1990-09-01

    SLIM ...................................... 33 SPQR /20 ................................... 35 System -4 .................................... 37 Previous...24 3. PRICE-S Outputs ..................................... 26 4. COCOMO Factors by Category ........................... 28 5. SPQR /20 Activities...actual schedules experienced on the projects. The models analyzed were REVIC, PRICE-S, System-4, SPQR /20, and SEER. ix A COMPARISON OF SOFTWARE

  8. LTE uplink scheduling - flow level analysis

    NARCIS (Netherlands)

    Dimitrova, D.C.; van den Berg, J.L.; Heijenk, G.; Litjens, R.; Sacchi, Claudio; Bellalta, Boris; Vinel, Alexey; Schlegel, Christian; Granelli, Fabrizio; Zhang, Yan

    Long Term Evolution (LTE) is a cellular technology foreseen to extend the capacity and improve the performance of current 3G cellular networks. A key mechanism in the LTE traffic handling is the packet scheduler, which is in charge of allocating resources to active flows in both the frequency and

  9. LTE uplink scheduling - Flow level analysis

    NARCIS (Netherlands)

    Dimitrova, D.C.; Berg, J.L. van den; Heijenk, G.; Litjens, R.

    2011-01-01

    Long Term Evolution (LTE) is a cellular technology foreseen to extend the capacity and improve the performance of current 3G cellular networks. A key mechanism in the LTE traffic handling is the packet scheduler, which is in charge of allocating resources to active flows in both the frequency and

  10. 29 CFR 1952.221 - Developmental schedule.

    Science.gov (United States)

    2010-07-01

    ... 29 Labor 9 2010-07-01 2010-07-01 false Developmental schedule. 1952.221 Section 1952.221 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR... Management data system operational July 1, 1973. Automated Management data system operational January 1, 1974...

  11. 29 CFR 1952.211 - Developmental schedule.

    Science.gov (United States)

    2010-07-01

    ... Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR... schedule. (a) Occupational health study accepted and implementation begun July, 1973; (b) Compliance Manual developed by July, 1973; (c) Management Information System, December, 1975; (d) Training in compliance...

  12. 29 CFR 1952.201 - Developmental schedule.

    Science.gov (United States)

    2010-07-01

    ... Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR... schedule. (a) Retraining of present occupational safety and health personnel during March-May 1973; (b... legislation, August 1, 1973; (d) Regulations on variances, August 1973; (e) Management information system...

  13. 29 CFR 1952.341 - Developmental schedule.

    Science.gov (United States)

    2010-07-01

    ... 29 Labor 9 2010-07-01 2010-07-01 false Developmental schedule. 1952.341 Section 1952.341 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR... State Legislature January 1975 and to become effective by May 1, 1975. (d) Management Information System...

  14. 76 FR 10233 - Schedule of Water Charges

    Science.gov (United States)

    2011-02-24

    ... DELAWARE RIVER BASIN COMMISSION 18 CFR Part 420 Schedule of Water Charges AGENCY: Delaware River..., Part III, Basin Regulations--Water Supply Charges. Accordingly, the Commission's water charging rates..., 2011. Effective Date: February 24, 2011. FOR FURTHER INFORMATION CONTACT: For questions about the water...

  15. Split Scheduling with Uniform Setup Times

    NARCIS (Netherlands)

    Schalekamp, F.; Sitters, R.A.; van der Ster, S.L.; Stougie, L.; Verdugo, V.; van Zuylen, A.

    2015-01-01

    We study a scheduling problem in which jobs may be split into parts, where the parts of a split job may be processed simultaneously on more than one machine. Each part of a job requires a setup time, however, on the machine where the job part is processed. During setup, a machine cannot process or

  16. Split scheduling with uniform setup times.

    NARCIS (Netherlands)

    F. Schalekamp; R.A. Sitters (René); S.L. van der Ster; L. Stougie (Leen); V. Verdugo; A. van Zuylen

    2015-01-01

    htmlabstractWe study a scheduling problem in which jobs may be split into parts, where the parts of a split job may be processed simultaneously on more than one machine. Each part of a job requires a setup time, however, on the machine where the job part is processed. During setup, a

  17. Physician Fee Schedule National Payment Amount File

    Data.gov (United States)

    U.S. Department of Health & Human Services — The significant size of the Physician Fee Schedule Payment Amount File-National requires that database programs (e.g., Access, dBase, FoxPro, etc.) be used to read...

  18. Direct block scheduling technology: Analysis of Avidity

    Directory of Open Access Journals (Sweden)

    Felipe Ribeiro Souza

    Full Text Available Abstract This study is focused on Direct Block Scheduling testing (Direct Multi-Period Scheduling methodology which schedules mine production considering the correct discount factor of each mining block, resulting in the final pit. Each block is analyzed individually in order to define the best target period. This methodology presents an improvement of the classical methodology derived from Lerchs-Grossmann's initial proposition improved by Whittle. This paper presents the differences between these methodologies, specially focused on the algorithms' avidity. Avidity is classically defined by the voracious search algorithms, whereupon some of the most famous greedy algorithms are Branch and Bound, Brutal Force and Randomized. Strategies based on heuristics can accentuate the voracity of the optimizer system. The applied algorithm use simulated annealing combined with Tabu Search. The most avid algorithm can select the most profitable blocks in early periods, leading to higher present value in the first periods of mine operation. The application of discount factors to blocks on the Lerchs-Grossmann's final pit has an accentuated effect with time, and this effect may make blocks scheduled for the end of the mine life unfeasible, representing a trend to a decrease in reported reserves.

  19. Artificial intelligence for the CTA Observatory scheduler

    Science.gov (United States)

    Colomé, Josep; Colomer, Pau; Campreciós, Jordi; Coiffard, Thierry; de Oña, Emma; Pedaletti, Giovanna; Torres, Diego F.; Garcia-Piquer, Alvaro

    2014-08-01

    The Cherenkov Telescope Array (CTA) project will be the next generation ground-based very high energy gamma-ray instrument. The success of the precursor projects (i.e., HESS, MAGIC, VERITAS) motivated the construction of this large infrastructure that is included in the roadmap of the ESFRI projects since 2008. CTA is planned to start the construction phase in 2015 and will consist of two arrays of Cherenkov telescopes operated as a proposal-driven open observatory. Two sites are foreseen at the southern and northern hemispheres. The CTA observatory will handle several observation modes and will have to operate tens of telescopes with a highly efficient and reliable control. Thus, the CTA planning tool is a key element in the control layer for the optimization of the observatory time. The main purpose of the scheduler for CTA is the allocation of multiple tasks to one single array or to multiple sub-arrays of telescopes, while maximizing the scientific return of the facility and minimizing the operational costs. The scheduler considers long- and short-term varying conditions to optimize the prioritization of tasks. A short-term scheduler provides the system with the capability to adapt, in almost real-time, the selected task to the varying execution constraints (i.e., Targets of Opportunity, health or status of the system components, environment conditions). The scheduling procedure ensures that long-term planning decisions are correctly transferred to the short-term prioritization process for a suitable selection of the next task to execute on the array. In this contribution we present the constraints to CTA task scheduling that helped classifying it as a Flexible Job-Shop Problem case and finding its optimal solution based on Artificial Intelligence techniques. We describe the scheduler prototype that uses a Guarded Discrete Stochastic Neural Network (GDSN), for an easy representation of the possible long- and short-term planning solutions, and Constraint

  20. Production planning and scheduling in refinery industry

    International Nuclear Information System (INIS)

    Persson, Jan.

    1999-01-01

    In this thesis we consider production planning and scheduling in refinery industry, in particular we study the planning and scheduling at the Nynaes AB refinery and at the Scanraff AB refinery. The purpose is to contribute to the development and the use of optimization models to support efficient decision making. We identify various decision problems concerning the aggregated production planning, the shipment planning, the scheduling of operation modes, and the utilization of pipes and tanks; and we discuss the potential to successfully apply optimization models on these problems. We formulate a mixed integer linear programming model for the scheduling of operation modes at Nynaes. The model concerns decisions about which mode of operation to use at a particular point in time in order to minimize costs of changing modes and costs of keeping inventories, given demands for products. We derive several types of valid inequalities for this mathematical problem and show how these inequalities can improve the lower bound obtained from the linear programming relaxation of the problem. We also show how the valid inequalities can be used to improve the performance of a branch and bound solution approach. Further, a tabu search heuristic is developed for the scheduling problem. The solution methods are tested on data provided by the Nynaes refinery, and the performance of the methods are discussed. We present several extensions of the proposed model, and illustrate how the model can be used to support both operational and strategic decision making at the refinery. 66 refs, 6 figs, 32 tabs. Also published as: Dissertation from the International Graduate School of Management and Industrial Engineering, No 25, Licenciate Thesis

  1. Production planning and scheduling in refinery industry

    Energy Technology Data Exchange (ETDEWEB)

    Persson, Jan

    1999-07-01

    In this thesis we consider production planning and scheduling in refinery industry, in particular we study the planning and scheduling at the Nynaes AB refinery and at the Scanraff AB refinery. The purpose is to contribute to the development and the use of optimization models to support efficient decision making. We identify various decision problems concerning the aggregated production planning, the shipment planning, the scheduling of operation modes, and the utilization of pipes and tanks; and we discuss the potential to successfully apply optimization models on these problems. We formulate a mixed integer linear programming model for the scheduling of operation modes at Nynaes. The model concerns decisions about which mode of operation to use at a particular point in time in order to minimize costs of changing modes and costs of keeping inventories, given demands for products. We derive several types of valid inequalities for this mathematical problem and show how these inequalities can improve the lower bound obtained from the linear programming relaxation of the problem. We also show how the valid inequalities can be used to improve the performance of a branch and bound solution approach. Further, a tabu search heuristic is developed for the scheduling problem. The solution methods are tested on data provided by the Nynaes refinery, and the performance of the methods are discussed. We present several extensions of the proposed model, and illustrate how the model can be used to support both operational and strategic decision making at the refinery. 66 refs, 6 figs, 32 tabs. Also published as: Dissertation from the International Graduate School of Management and Industrial Engineering, No 25, Licenciate Thesis.

  2. Production planning and scheduling in refinery industry

    Energy Technology Data Exchange (ETDEWEB)

    Persson, Jan

    1999-06-01

    In this thesis we consider production planning and scheduling in refinery industry, in particular we study the planning and scheduling at the Nynaes AB refinery and at the Scanraff AB refinery. The purpose is to contribute to the development and the use of optimization models to support efficient decision making. We identify various decision problems concerning the aggregated production planning, the shipment planning, the scheduling of operation modes, and the utilization of pipes and tanks; and we discuss the potential to successfully apply optimization models on these problems. We formulate a mixed integer linear programming model for the scheduling of operation modes at Nynaes. The model concerns decisions about which mode of operation to use at a particular point in time in order to minimize costs of changing modes and costs of keeping inventories, given demands for products. We derive several types of valid inequalities for this mathematical problem and show how these inequalities can improve the lower bound obtained from the linear programming relaxation of the problem. We also show how the valid inequalities can be used to improve the performance of a branch and bound solution approach. Further, a tabu search heuristic is developed for the scheduling problem. The solution methods are tested on data provided by the Nynaes refinery, and the performance of the methods are discussed. We present several extensions of the proposed model, and illustrate how the model can be used to support both operational and strategic decision making at the refinery. 66 refs, 6 figs, 32 tabs. Also published as: Dissertation from the International Graduate School of Management and Industrial Engineering, No 25, Licenciate Thesis

  3. Scheduling Broadcasts in a Network of Timelines

    KAUST Repository

    Manzoor, Emaad A.

    2015-05-12

    Broadcasts and timelines are the primary mechanism of information exchange in online social platforms today. Services like Facebook, Twitter and Instagram have enabled ordinary people to reach large audiences spanning cultures and countries, while their massive popularity has created increasingly competitive marketplaces of attention. Timing broadcasts to capture the attention of such geographically diverse audiences has sparked interest from many startups and social marketing gurus. However, formal study is lacking on both the timing and frequency problems. In this thesis, we introduce, motivate and solve the broadcast scheduling problem of specifying the timing and frequency of publishing content to maximise the attention received. We validate and quantify three interacting behavioural phenomena to parametrise social platform users: information overload, bursty circadian rhythms and monotony aversion, which is defined here for the first time. Our analysis of the influence of monotony refutes the common assumption that posts on social network timelines are consumed piecemeal independently. Instead, we reveal that posts are consumed in chunks, which has important consequences for any future work considering human behaviour over social network timelines. Our quantification of monotony aversion is also novel, and has applications to problems in various domains such as recommender list diversification, user satiation and variety-seeking consumer behaviour. Having studied the underlying behavioural phenomena, we link schedules, timelines, attention and behaviour by formalising a timeline information exchange process. Our formulation gives rise to a natural objective function that quantifies the expected collective attention an arrangement of posts on a timeline will receive. We apply this formulation as a case-study on real-data from Twitter, where we estimate behavioural parameters, calculate the attention potential for different scheduling strategies and, using the

  4. On the secondary users opportunistic scheduling with reduced feedback

    KAUST Repository

    Song, Yao

    2012-03-01

    In underlay cognitive radio systems, secondary users (SUs) can share the spectrum with primary users (PUs) as long as the interference caused by SUs to PUs is below a certain threshold. When multiple SUs want to access the channel, multiuser diversity scheme can be applied to maximize the utilization rate of the channel. In this paper, the performance of selective multi user diversity scheme in underlay cognitive radio system is analyzed. We first start with the case in which all SUs have the same average signal-to-noise ratio (SNR). We then treat the more realistic case involving SUs with different average SNRs. Both power control and no power control scenarios are considered for the SUs. Furthermore, we take scheduling fairness into considerations and study a normalized SNR selection scheme in the case that SUs have different average SNRs. © 2012 IEEE.

  5. Cu4Pr6(MoO4)11-Pr2(MoO4)3 system

    International Nuclear Information System (INIS)

    Arzumanyan, G.A.

    1982-01-01

    Existence boundaries and Dalton compositions (CuPr(MoO 4 ) 2 , CuPr 3 (MoO 4 ) 5 ) of solid solutions that in the mojority are of shcheelite dsitored structure have been determined in the Cu 4 Pr 6 (MoO 4 ) 11 -Pr 2 (MoO 4 ) 3 system. It has been revealed that regions of homogeneity near the CuPr(MoO 4 ) 2 composition have a horseshoeshaped profile

  6. LiNbO3 :Pr3+ : A Multipiezo Material with Simultaneous Piezoelectricity and Sensitive Piezoluminescence.

    Science.gov (United States)

    Tu, Dong; Xu, Chao-Nan; Yoshida, Akihito; Fujihala, Masayoshi; Hirotsu, Jou; Zheng, Xu-Guang

    2017-06-01

    Red-emitting piezoluminescence (elasticoluminescence) is achieved by doping rare earth Pr 3+ into the well-known piezoelectric matrix, LiNbO 3 . By precisely tuning the Li/Nb ratio in nonstoichiometric Li x NbO 3 :Pr 3+ , a material that exhibits an unusually high piezoluminescence intensity, which far exceeds that of any well-known piezoelectric material, is produced. Li x NbO 3 :Pr 3+ shows excellent strain sensitivity at the lowest strain level, with no threshold for stress sensing. These multipiezo properties of sensitive piezoluminescence in a piezoelectric matrix are ideal for microstress sensing, damage diagnosis, electro-mechano-optical energy conversion, and multifunctional control in optoelectronics. © 2017 WILEY-VCH Verlag GmbH & Co. KGaA, Weinheim.

  7. Luminescent properties of LuPO4-Pr and LuPO4-Eu nanoparticles

    International Nuclear Information System (INIS)

    Vistovskyy, V.; Malyi, T.; Vas’kiv, A.; Chylii, M.; Mitina, N.; Zaichenko, A.; Gektin, A.; Voloshinovskii, A.

    2016-01-01

    Spectral-luminescence parameters of LuPO 4 -Eu and LuPO 4 -Pr nanoparticles of different sizes are studied upon excitation by the synchrotron radiation with photon energies 4–40 eV. Influence of the nanoparticle size on Eu 3+ and Pr 3+ impurity luminescence is analyzed for intracenter and recombination excitation. It is shown that the luminescence intensity of impurities in the case of recombination excitation significantly stronger decreases with decreasing of nanoparticle size compared to intracenter excitation. This feature is explained by the influence of thermalization length to nanoparticle size ratio on the recombination luminescence. Electron recombination luminescence inherent for LuPO 4 -Eu nanoparticles shows a weaker dependence on the nanoparticle size than the hole one in LuPO 4 -Pr nanoparticles. The difference between energy states of praseodymium impurity ions in nanoparticles of different sizes is revealed.

  8. Online Scheduling in Manufacturing A Cumulative Delay Approach

    CERN Document Server

    Suwa, Haruhiko

    2013-01-01

    Online scheduling is recognized as the crucial decision-making process of production control at a phase of “being in production" according to the released shop floor schedule. Online scheduling can be also considered as one of key enablers to realize prompt capable-to-promise as well as available-to-promise to customers along with reducing production lead times under recent globalized competitive markets. Online Scheduling in Manufacturing introduces new approaches to online scheduling based on a concept of cumulative delay. The cumulative delay is regarded as consolidated information of uncertainties under a dynamic environment in manufacturing and can be collected constantly without much effort at any points in time during a schedule execution. In this approach, the cumulative delay of the schedule has the important role of a criterion for making a decision whether or not a schedule revision is carried out. The cumulative delay approach to trigger schedule revisions has the following capabilities for the ...

  9. Analysis and Optimisation of Hierarchically Scheduled Multiprocessor Embedded Systems

    DEFF Research Database (Denmark)

    Pop, Traian; Pop, Paul; Eles, Petru

    2008-01-01

    We present an approach to the analysis and optimisation of heterogeneous multiprocessor embedded systems. The systems are heterogeneous not only in terms of hardware components, but also in terms of communication protocols and scheduling policies. When several scheduling policies share a resource......, they are organised in a hierarchy. In this paper, we first develop a holistic scheduling and schedulability analysis that determines the timing properties of a hierarchically scheduled system. Second, we address design problems that are characteristic to such hierarchically scheduled systems: assignment...... of scheduling policies to tasks, mapping of tasks to hardware components, and the scheduling of the activities. We also present several algorithms for solving these problems. Our heuristics are able to find schedulable implementations under limited resources, achieving an efficient utilisation of the system...

  10. Automated scheduling and planning from theory to practice

    CERN Document Server

    Ozcan, Ender; Urquhart, Neil

    2013-01-01

      Solving scheduling problems has long presented a challenge for computer scientists and operations researchers. The field continues to expand as researchers and practitioners examine ever more challenging problems and develop automated methods capable of solving them. This book provides 11 case studies in automated scheduling, submitted by leading researchers from across the world. Each case study examines a challenging real-world problem by analysing the problem in detail before investigating how the problem may be solved using state of the art techniques.The areas covered include aircraft scheduling, microprocessor instruction scheduling, sports fixture scheduling, exam scheduling, personnel scheduling and production scheduling.  Problem solving methodologies covered include exact as well as (meta)heuristic approaches, such as local search techniques, linear programming, genetic algorithms and ant colony optimisation.The field of automated scheduling has the potential to impact many aspects of our lives...

  11. Group Elevator Peak Scheduling Based on Robust Optimization Model

    Directory of Open Access Journals (Sweden)

    ZHANG, J.

    2013-08-01

    Full Text Available Scheduling of Elevator Group Control System (EGCS is a typical combinatorial optimization problem. Uncertain group scheduling under peak traffic flows has become a research focus and difficulty recently. RO (Robust Optimization method is a novel and effective way to deal with uncertain scheduling problem. In this paper, a peak scheduling method based on RO model for multi-elevator system is proposed. The method is immune to the uncertainty of peak traffic flows, optimal scheduling is realized without getting exact numbers of each calling floor's waiting passengers. Specifically, energy-saving oriented multi-objective scheduling price is proposed, RO uncertain peak scheduling model is built to minimize the price. Because RO uncertain model could not be solved directly, RO uncertain model is transformed to RO certain model by elevator scheduling robust counterparts. Because solution space of elevator scheduling is enormous, to solve RO certain model in short time, ant colony solving algorithm for elevator scheduling is proposed. Based on the algorithm, optimal scheduling solutions are found quickly, and group elevators are scheduled according to the solutions. Simulation results show the method could improve scheduling performances effectively in peak pattern. Group elevators' efficient operation is realized by the RO scheduling method.

  12. Use Of Biodegradation Ratios In Monitoring Trend Of Biostimulated Biodegradation In Crude Oil Polluted Soils

    Directory of Open Access Journals (Sweden)

    Okorondu

    2017-03-01

    Full Text Available This study deals with biodegradation experiment on soil contaminated with crude oil. The soil sample sets A BC D E F G were amended with inorganic fertilizer to enhance microbial growth and hydrocarbon degradation moisture content of some of the sets were as well varied. Biodegradation ratios nC17Pr nC18Ph and nC17nC18PrPh were used to monitor biodegradation of soil sets A BC D E F G for a period of 180. The soil samples were each contaminated with the same amount of crude oil and exposed to specific substrate treatment regarding the amount of nutrients and water content over the same period of time. The trend in biodegradation of the different soil sample sets shows that biodegradation ratio nC17nC18PrPh was more reflective of and explains the biodegradation trend in all the sample sets throughout the period of the experiment hence a better parameter ratio for monitoring trend of biostimulated biodegradation. The order of preference of the biodegradation ratios is expressed as nC18Ph nC17Pr nC17nC18 PrPh. This can be a relevant support tool when designing bioremediation plan on field.

  13. A phase III randomized controlled study on the efficacy and improved bowel function of prolonged-release (PR) oxycodone-naloxone (up to 160/80 mg daily) vs oxycodone PR.

    Science.gov (United States)

    Dupoiron, D; Stachowiak, A; Loewenstein, O; Ellery, A; Kremers, W; Bosse, B; Hopp, M

    2017-10-01

    Oxycodone/naloxone (OXN PR) is a prolonged-release formulation containing oxycodone and naloxone in a 2:1 ratio. This study aimed to evaluate the tolerability and efficacy of doses up to OXN160/80 mg PR compared with oxycodone prolonged-release formulation (OxyPR) in a randomised controlled trial. Two hundred and forty-three patients were randomised to treatment with OXN PR (n = 123) or OxyPR (n = 120) during the 5-week double-blind study. Measured were: opioid-induced constipation [bowel function index score (BFI)]; analgesic efficacy (NRS 0-10); daily laxative rescue medication use; rescue medication use, and the number of complete spontaneous bowel movements (CSBMs) per week. A subanalysis was conducted in cancer patients. Greater reductions in mean BFI scores were reported for the OXN PR group compared with OxyPR from Week 1 onwards; at Week 5 the mean change from baseline was -32.5 versus -14.2. Average 24-h pain scores were low and remained stable in the range 3-4 in both treatment groups. Analgesic rescue medication use was similar between the groups. Patients receiving OXN PR used significantly lower mean daily doses of laxative rescue medication than those receiving OxyPR (P = 0.006). The number of CSBM in the OXN PR group approximately doubled compared with a 25% decrease in the OxyPR group. Comparable results to the total study population were reported in the cancer patient subgroup. OXN PR in daily doses of up to 160/80 mg significantly improves bowel function compared with equivalent doses of OxyPR while still providing comparable analgesic efficacy. Effective analgesia can be achieved using oxycodone/naloxone PR up to 160/80 mg daily without compromising bowel function. A similar outcome was reported in cancer and non-cancer patients. © 2017 The Authors. European Journal of Pain published by John Wiley & Sons Ltd on behalf of European Pain Federation - EFIC®.

  14. Optimization of Pr3+:ZBLAN fiber amplifiers

    DEFF Research Database (Denmark)

    Pedersen, B.; Miniscalco, J. W.; Quimby, R. S.

    1992-01-01

    Experimental parameters have been measured and used in a quantitative model of Pr3+-doped fluorozirconate fiber amplifiers. The optimum cutoff wavelength was determined to be 800 nm and the gain for 400 mW of pump was found to increase from 12 to 34 dB if the NA was increased from 0.15 to 0...

  15. Prøvetagning af grundvand

    DEFF Research Database (Denmark)

    Sørensen, Inga

    Bogen fokuserer på prøveatgning af grundvand og drikkevand til forskellige formål såsom undersøgelse af forurenede grunde, grundvandsmonitering samt produktion af drikkevand. Da grundvand i sagens natur findes under jordoverfladen, beskriver bogen også væsentlige forhold om hydrogeologi og...

  16. Prescriptions for schedule II opioids and benzodiazepines increase after the introduction of computer-generated prescriptions.

    Science.gov (United States)

    McGerald, Genevieve; Dvorkin, Ronald; Levy, David; Lovell-Rose, Stephanie; Sharma, Adhi

    2009-06-01

    Prescriptions for controlled substances decrease when regulatory barriers are put in place. The converse has not been studied. The objective was to determine whether a less complicated prescription writing process is associated with a change in the prescribing patterns of controlled substances in the emergency department (ED). The authors conducted a retrospective nonconcurrent cohort study of all patients seen in an adult ED between April 19, 2005, and April 18, 2007, who were discharged with a prescription. Prior to April 19, 2006, a specialized prescription form stored in a locked cabinet was obtained from the nursing staff to write a prescription for benzodiazepines or Schedule II opioids. After April 19, 2006, New York State mandated that all prescriptions, regardless of schedule classification, be generated on a specialized bar-coded prescription form. The main outcome of the study was to compare the proportion of Schedule III-V opioids to Schedule II opioids and benzodiazepines prescribed in the ED before and after the introduction of a less cumbersome prescription writing process. Of the 26,638 charts reviewed, 2.1% of the total number of prescriptions generated were for a Schedule II controlled opioid before the new system was implemented compared to 13.6% after (odds ratio [OR] = 7.3, 95% confidence interval [CI] = 6.4 to 8.4). The corresponding percentages for Schedule III-V opioids were 29.9% to 18.1% (OR = 0.52, 95% CI = 0.49 to 0.55) and for benzodiazepines 1.4% to 3.9% (OR = 2.8, 95% CI = 2.4 to 3.4). Patients were more likely to receive a prescription for a Schedule II opioid or a benzodiazepine after a more streamlined computer-generated prescription writing process was introduced in this ED. (c) 2009 by the Society for Academic Emergency Medicine.

  17. Mechanistic prospective for human PrPC conversion to PrPSc: Molecular dynamic insights

    OpenAIRE

    Nooshin Azari; Mohammad Reza Dayer; Nematollah Razmi; Mohammad Saaid Dayer

    2013-01-01

    PrPC conversion to PrPSc isoform is the main known cause for prion diseases including Crutzfeldt-Jakob, Gerstmann-Sträussler-Sheinker syndrome and fatal familial insomnia in human. The precise mechanism underling this conversion is yet to be well understood. In the present work, using the coordinate file of PrPC (available on the Protein Data Bank) as a starting structure, separate molecular dynamic simulations were carried out at neutral and acidic pH in an explicit water box at 37°C and 1 ...

  18. Optimal investment and scheduling of distributed energy resources with uncertainty in electric vehicles driving schedules

    Energy Technology Data Exchange (ETDEWEB)

    Cardoso, Goncalo [Technical Univ. of Lisbon (Portugal); Stadler, Michael [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Center for Energy and Innovation Technologies (Austria); Bozchalui, Mohammed C. [NEC Laboratories American Inc., Irving, TX (United States); Sharma, Ratnesh [NEC Laboratories American Inc., Irving, TX (United States); Marnay, Chris [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Barbosa-Povoa, Ana [Technical Univ. of Lisbon (Portugal); Ferrao, Paulo [Technical Univ. of Lisbon (Portugal)

    2013-12-06

    The large scale penetration of electric vehicles (EVs) will introduce technical challenges to the distribution grid, but also carries the potential for vehicle-to-grid services. Namely, if available in large enough numbers, EVs can be used as a distributed energy resource (DER) and their presence can influence optimal DER investment and scheduling decisions in microgrids. In this work, a novel EV fleet aggregator model is introduced in a stochastic formulation of DER-CAM [1], an optimization tool used to address DER investment and scheduling problems. This is used to assess the impact of EV interconnections on optimal DER solutions considering uncertainty in EV driving schedules. Optimization results indicate that EVs can have a significant impact on DER investments, particularly if considering short payback periods. Furthermore, results suggest that uncertainty in driving schedules carries little significance to total energy costs, which is corroborated by results obtained using the stochastic formulation of the problem.

  19. An improved sheep flock heredity algorithm for job shop scheduling and flow shop scheduling problems

    Directory of Open Access Journals (Sweden)

    Chandramouli Anandaraman

    2011-10-01

    Full Text Available Job Shop Scheduling Problem (JSSP and Flow Shop Scheduling Problem (FSSP are strong NP-complete combinatorial optimization problems among class of typical production scheduling problems. An improved Sheep Flock Heredity Algorithm (ISFHA is proposed in this paper to find a schedule of operations that can minimize makespan. In ISFHA, the pairwise mutation operation is replaced by a single point mutation process with a probabilistic property which guarantees the feasibility of the solutions in the local search domain. A Robust-Replace (R-R heuristic is introduced in place of chromosomal crossover to enhance the global search and to improve the convergence. The R-R heuristic is found to enhance the exploring potential of the algorithm and enrich the diversity of neighborhoods. Experimental results reveal the effectiveness of the proposed algorithm, whose optimization performance is markedly superior to that of genetic algorithms and is comparable to the best results reported in the literature.

  20. Radical radiotherapy for invasive bladder cancer: What dose and fractionation schedule to choose?

    International Nuclear Information System (INIS)

    Pos, Floris J.; Hart, Guus; Schneider, Christoph; Sminia, Peter

    2006-01-01

    Purpose: To establish the α/β ratio of bladder cancer from different radiotherapy schedules reported in the literature and provide guidelines for the design of new treatment schemes. Methods and Materials: Ten external beam radiotherapy (EBRT) and five brachytherapy schedules were selected. The biologically effective dose (BED) of each schedule was calculated. Logistic modeling was used to describe the relationship between 3-year local control (LC3y) and BED. Results: The estimated α/β ratio was 13 Gy (95% confidence interval [CI], 2.5-69 Gy) for EBRT and 24 Gy (95% CI, 1.3-460 Gy) for EBRT and brachytherapy combined. There is evidence for an overall dose-response relationship. After an increase in total dose of 10 Gy, the odds of LC3y increase by a factor of 1.44 (95% CI, 1.23-1.70) for EBRT and 1.47 (95% CI, 1.25-1.72) for the data sets of EBRT and brachytherapy combined. Conclusion: With the clinical data currently available, a reliable estimation of the α/β ratio for bladder cancer is not feasible. It seems reasonable to use a conventional α/β ratio of 10-15 Gy. Dose escalation could significantly increase local control. There is no evidence to support short overall treatment times or large fraction sizes in radiotherapy for bladder cancer