WorldWideScience

Sample records for quarterly project status

  1. Hazardous materials in aquatic environments of the Mississippi River Basin. Quarterly project status report, October 1, 1993--December 31, 1993

    Energy Technology Data Exchange (ETDEWEB)

    1993-12-31

    This quarterly project status report discusses research projects being conducted on hazardous materials in aquatic environments of the Mississippi River basin. We continued to seek improvement in our methods of communication and interactions to support the inter-disciplinary, inter-university collaborators within this program. In addition to the defined collaborative research teams, there is increasing interaction among investigators across projects. Planning for the second year of the project has included the development of our internal request for proposals, and refining the review process for selection of proposals for funding.

  2. Hazardous materials in aquatic environments of the Mississippi River basin. Quarterly project status report, April 1, 1993--June 30, 1993

    Energy Technology Data Exchange (ETDEWEB)

    1993-08-01

    During this quarter, the Review Panel made its final recommendations regarding which of the proposals should be funded. Included in this report is a brief status report of each of the research and education projects that are currently funded in this project. The Coordinated Instrumentation Facility (CIF) sponsored 3 seminars on Environmental Sample Preparation Techniques. These seminars were designed to educate the investigators on the use of microwave digestion systems for sample preparation and the use of Inductively Coupled Plasma and Atomic Absorption Specrtroscopy for analyses. During this period, Tulane and Xavier Universities have worked closely with Oak Ridge National Laboratories (ORNL) to develop a long term relationship that will encourage interaction and collaborations among the investigators at all of the institutions.

  3. Short-term energy outlook: Quarterly projections, fourth quarter 1997

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-10-14

    The Energy Information Administration (EIA) prepares quarterly short-term energy supply, demand, and price projections for printed publication in January, April, July, and October in the Short-Term Energy Outlook. The details of these projections, as well as monthly updates on or about the 6th of each interim month, are available on the internet at: www.eia.doe.gov/emeu/steo/pub/contents.html. The forecast period for this issue of the Outlook extends from the fourth quarter of 1997 through the fourth quarter of 1998. Values for the fourth quarter of 1997, however, are preliminary EIA estimates (for example, some monthly values for petroleum supply and disposition are derived in part from weekly data reported in EIA`s Weekly Petroleum Status Report) or are calculated from model simulations that use the latest exogenous information available (for example, electricity sales and generation are simulated by using actual weather data). The historical energy data, compiled in the fourth quarter 1997 version of the Short-Term Integrated Forecasting System (STIFS) database, are mostly EIA data regularly published in the Monthly Energy Review, Petroleum Supply Monthly, and other EIA publications. Minor discrepancies between the data in these publications and the historical data in this Outlook are due to independent rounding. The STIFS model is driven principally by three sets of assumptions or inputs: estimates of key macroeconomic variables, world oil price assumptions, and assumptions about the severity of weather. 19 tabs.

  4. Short-Term Energy Outlook: Quarterly projections. Fourth quarter 1993

    Energy Technology Data Exchange (ETDEWEB)

    1993-11-05

    The Energy Information Administration (EIA) prepares quarterly, short-term energy supply, demand, and price projections for publication in February, May, August, and November in the Short-Term Energy Outlook (Outlook). An annual supplement analyzes the performance of previous forecasts, compares recent cases with those of other forecasting services, and discusses current topics related to the short-term energy markets. (See Short-Term Energy Outlook Annual Supplement, DOE/EIA-0202.) The forecast period for this issue of the Outlook extends from the fourth quarter of 1993 through the fourth quarter of 1994. Values for the third quarter of 1993, however, are preliminary EIA estimates (for example, some monthly values for petroleum supply and disposition are derived in part from weekly data reported in the Weekly Petroleum Status Report) or are calculated from model simulations using the latest exogenous information available (for example, electricity sales and generation are simulated using actual weather data). The historical energy data are EIA data published in the Monthly Energy Review, Petroleum Supply Monthly, and other EIA publications.

  5. Hazardous materials in aquatic environments of the Mississippi River Basin. Quarterly project status report, July 1, 1993--September 30, 1993

    Energy Technology Data Exchange (ETDEWEB)

    1993-11-01

    This document is a brief progress report from each of the research and education projects that are currently funded through the ERWM contract. During third quarter 1993, approval was given by DOE for purchase of equipment. Equipment purchases were initiated and much of the equipment has been received and installed. The committees in charge of coordination of sampling and analyses associated with the collaborative research groups continued to meet and address these issues. Sampling has been done in the lower part of Devil`s Swamp and in the Devil`s Swamp Lake area. In addition, extensive sampling has been done in Bayou Trepagnier and in Bayou St. John. During this period, Tulane and Xavier Universities continued working closely with Oak Ridge National Laboratories (ORNL). The ORNL 1993 summer student internship program was completed. Plans were made for expanding the program to support 8 students next summer. Leonard Price, a Xavier University Chemistry professor and John Walz, a Tulane University Engineering professor each spent 5 weeks at ORNL. During this time these faculty worked with ORNL researchers exploring mutual interests and discussing possible future collaborations. In September, Drs. Carl Gehrs, Lee Shugart and Marshall Adams of ORNL, visited the Tulane and Xavier campuses. They presented two seminars and met with several of the investigators being supported by the ERWM contract. Tulane/Xavier project administrators participated in the Office of Technology Development`s ``New Technologies and Program Exhibition`` in the Rayburn House Office Building on September 23 and in the Hart Senate Office Building on September 27.

  6. Mobility control for CO/sub 2/ injection (support for field project). Fourteenth quarterly report including project status report, August 17-November 17, 1984

    Energy Technology Data Exchange (ETDEWEB)

    Heller, J.P.

    1985-01-10

    The goals of this contract have been: (1) to continue activities under a companion project, DE-AC21-79MC10689 (now completed), that was aimed at the development of mobility control additives or procedures in CO/sub 2/ floods, and to apply these to the particular problems of the Rock Creek Field; (2) to conduct additional laboratory tests designed to study the compatibility of Rock Creek oil, brine and reservoir rock with CO/sub 2/ and with other chemicals which might be involved in mobility-controlled CO/sub 2/ floods; (3) to provide support in the design of the field mobility control tests, themselves; and (4) to help in the assessment of field results, and in the design of tests to be used for such assessment. As was noted in the previous quarterly report, the first three of these objectives have been completed. Similarly, that portion of objective four dealing with the design of assessment methods for the mobility control experiment has also been completed. Since the issuance of our thirteenth quarterly, several new operational decisions have been made concerning these assessment methods. Although these modified procedures differ somewhat from those originally suggested, they can be more reliably and conveniently carried out in the field and can also be expected to yield useful information on the progress and effectiveness of the experiment. The mobility-controlled displacement experiment is currently underway, as is the sample analysis program. This report gives in detail the design changes made since the previous quarterly, as well as a chronology of events up to the time of writing. 1 figure.

  7. Short-term energy outlook, quarterly projections, first quarter 1998

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-01-01

    The forecast period for this issue of the Outlook extends from the first quarter of 1998 through the fourth quarter of 1999. Values for the fourth quarter of 1997, however, are preliminary EIA estimates (for example, some monthly values for petroleum supply and disposition are derived in part from weekly data reported in EIA`s Weekly Petroleum Status Report) or are calculated from model simulations that use the latest exogenous information available (for example, electricity sales and generation are simulated by using actual weather data). The historical energy data, compiled in the first quarter 1998 version of the Short-Term Integrated Forecasting System (STIFS) database, are mostly EIA data regularly published in the Monthly Energy Review, Petroleum Supply Monthly, and other EIA publications. Minor discrepancies between the data in these publications and the historical data in this Outlook are due to independent rounding. The STIFS model is driven principally by three sets of assumptions or inputs: estimates of key macroeconomic variables, world oil price assumptions, and assumptions about the severity of weather. Macroeconomic estimates are adjusted by EIA to reflect EIA assumptions which may affect the macroeconomic outlook. By varying the assumptions, alternative cases are produced by using the STIFS model. 24 figs., 19 tabs.

  8. Short-term energy outlook, quarterly projections, second quarter 1998

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-04-01

    The Energy Information Administration (EIA) prepares quarterly short-term energy supply, demand, and price projections. The details of these projections, as well as monthly updates, are available on the Internet at: www.eia.doe.gov/emeu/steo/pub/contents.html. The paper discusses outlook assumptions; US energy prices; world oil supply and the oil production cutback agreement of March 1998; international oil demand and supply; world oil stocks, capacity, and net trade; US oil demand and supply; US natural gas demand and supply; US coal demand and supply; US electricity demand and supply; US renewable energy demand; and US energy demand and supply sensitivities. 29 figs., 19 tabs.

  9. Hazardous materials in aquatic environments of the Mississippi River Basin. Quarterly project status report, 1 April--30 June 1994

    Energy Technology Data Exchange (ETDEWEB)

    1994-08-01

    This report contains a cluster of twenty separate project reports concerning the fate, environmental transport, and toxicity of hazardous wastes in the Mississippi River Basin. Some of topics investigated involve: biological uptake and metabolism; heavy metal immobilization; biological indicators; toxicity; and mathematical models.

  10. Weldon Spring Site Remedial Action Project quarterly environmental data summary (QEDS) for fourth quarter 1998

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-02-01

    This report contains the Quarterly Environmental Data Summary (QEDS) for the fourth quarter of 1998 in support of the Weldon Spring Site Remedial Action Project Federal Facilities Agreement. The data, except for air monitoring data and site KPA generated data (uranium analyses) were received from the contract laboratories, verified by the Weldon Spring Site verification group, and merged into the database during the fourth quarter of 1998. KPA results for on-site total uranium analyses performed during fourth quarter 1998 are included. Air monitoring data presented are the most recent complete sets of quarterly data.

  11. Hazardous materials in Aquatic environments of the Mississippi River basin. Quarterly project status report, 1 January 1994--30 March 1994

    Energy Technology Data Exchange (ETDEWEB)

    Abdelghani, A.

    1994-06-01

    Projects associated with this grant for studying hazardous materials in aquatic environments of the Mississippi River Basin are reviewed and goals, progress and research results are discussed. New, one-year initiation projects are described briefly.

  12. Short-term energy outlook, October 1998. Quarterly projections, 1998 4. quarter

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-10-01

    The Energy Information Administration (EIA) prepares The Short-Term Energy Outlook (energy supply, demand, and price projections) monthly for distribution on the Internet at: www.eia.doe.gov/emeu/steo/pub/contents.html. In addition, printed versions of the report are available to subscribers in January, April, July and October. The forecast period for this issue of the Outlook extends from October 1998 through December 1999. Values for third quarter of 1998 data, however, are preliminary EIA estimates (for example, some monthly values for petroleum supply and disposition are derived in part from weekly data reported in EIA`s Weekly Petroleum Status Report) or are calculated from model simulations that use the latest exogenous information available (for example, electricity sales and generation are simulated by using actual weather data). The historical energy data, compiled in the October 1998 version of the Short-term Integrated Forecasting System (STIFS) database, are mostly EIA data regularly published in the Monthly Energy Review, Petroleum Supply Monthly, and other EIA publications. Minor discrepancies between the data in these publications and the historical data in this Outlook are due to independent rounding.

  13. Yucca Mountain Site Characterization Project technical data catalog: Quarterly supplement

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-12-31

    The Department of Energy (DOE)/Nuclear Regulatory Commission (NRC) Site-Specific Procedural Agreement for Geologic Repository Site Investigation and Characterization Program requires the DOE to develop and maintain a catalog of data which will be updated and provided to the NRC at least quarterly. This catalog is to include a description of the data; the time (date), place, and method of acquisition; and where the data may be examined. The Yucca Mountain Site Characterization Project (YMP) Technical Data Catalog is published and distributed-in accordance with the requirements of the Site-Specific Agreement. The YMP Technical Data Catalog is a report based on reference information contained in the YMP Automated Technical Data Tracking System (ATDT). The reference information is provided by Participants for data acquired or developed in support of the YMP. The Technical Data Catalog is updated quarterly and distributed in the month following the end of each quarter. A complete revision to the catalog is published at the end of each fiscal year. Supplements to the end-of-year edition are published each quarter. These supplements provide information related to new data items not included in previous quarterly updates and data items affected by changes to previously published reference information. The Technical Data Catalog, dated September 30, 1994, should be retained as the baseline document for the supplements until the end-of-year revision is published and distributed in October 1995.

  14. Yucca Mountain Site Characterization Project technical data catalog quarterly supplement

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-03-31

    The Department of Energy (DOE)/Nuclear Regulatory Commission (NRC) Site-Specific Procedural Agreement for Geologic Repository Site Investigation and Characterization Program requires the DOE to develop and maintain a catalog of data which will be updated and provided to the NRC at least quarterly. This catalog is to include a description of the data; the time (date), place, and method of acquisition; and where the data may be examined. The Yucca Mountain Site Characterization Project (YMP) Technical Data Catalog is published and distributed in accordance with t requirements of the Site-Specific Agreement. The YMP Technical Data Catalog is a report based on reference information contained in the YMP Automated Technical Data Tracking System (ATDT). The reference information is provided by Participants for data acquired or developed in support of the YMP. The Technical Data Catalog is updated quarterly and distributed in the month following the end of each quarter. A complete revision to the catalog is published at the end of each fiscal year. Supplements to the end-of-year edition are published each quarter. These supplements provide information related to new data items not included in previous quarterly updates and data items affected by changes to@ previously published reference information. The Technical Data Catalog, dated September 30, 1994, should be retained as the baseline document for the supplements until the end-of-year revision is published and distributed in October 1995.

  15. Yucca Mountain Site Characterization Project: Technical Data Catalog quarterly supplement

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-03-31

    The March 21, 1993, Department of Energy (DOE)/Nuclear Regulatory Commission (NRC) Site-Specific Procedural Agreement for Geologic Repository Site Investigation and Characterization Program requires the DOE to develop and maintain a catalog of data which will be updated and provided to the NRC at least quarterly. This catalog is to include a description of the data; the time (date), place, and method of acquisition; and where it may be examined. The Yucca Mountain Site Characterization Project (YMP) Technical Data Catalog is published and distributed in accordance with the requirements of the Site-Specific Agreement. The YMP Technical Data Catalog is a report based on reference information contained in the YMP Automated Technical Data Tracking System (ATDT). The reference information is provided by Participants for data acquired or developed in support of the YMP. The Technical Data Catalog is updated quarterly and published in the month following the end of each quarter. A complete revision to the Catalog is published at the end of each fiscal year. Supplements to the end-of-year edition are published each quarter. These supplements provide information related to new data items not included in previous quarterly updates and data items affected by changes to previously published reference information. The Technical Data Catalog, dated September 30, 1993, should be retained as the baseline document for the supplements until the end-of-year revision is published and distributed in October 1994.

  16. Los Alamos National Laboratory Environmental Restoration Project quarterly technical report, April--June 1994

    Energy Technology Data Exchange (ETDEWEB)

    1994-08-18

    This quarterly report describes the technical status of activities in the Los Alamos National Laboratory Environmental Restoration (ER) Project. Each activity is identified by an activity data sheet number, a brief title describing the activity or the technical area where the activity is located, and the name of the project leader. The Hazardous and Solid Waste Amendments (HSWA) portion of the facility operating permit requires the submission of a technical progress report on a quarterly basis. This report, submitted to fulfill the permit`s requirement, summarizes the work performed and the results of sampling and analysis in the ER Project. Suspect waste found include: Radionuclides, high explosives, metals, solvents and organics. The data provided in this report have not been validated. These data are considered ``reviewed data.``

  17. Genomics :GTL project quarterly report April 2005.

    Energy Technology Data Exchange (ETDEWEB)

    Rintoul, Mark Daniel; Martino, Anthony A.; Palenik, Brian; Heffelfinger, Grant S.; Xu, Ying; Geist, Al; Gorin, Andrey

    2005-11-01

    This SAND report provides the technical progress through April 2005 of the Sandia-led project, ''Carbon Sequestration in Synechococcus Sp.: From Molecular Machines to Hierarchical Modeling'', funded by the DOE Office of Science GenomicsGTL Program. Understanding, predicting, and perhaps manipulating carbon fixation in the oceans has long been a major focus of biological oceanography and has more recently been of interest to a broader audience of scientists and policy makers. It is clear that the oceanic sinks and sources of CO{sub 2} are important terms in the global environmental response to anthropogenic atmospheric inputs of CO{sub 2} and that oceanic microorganisms play a key role in this response. However, the relationship between this global phenomenon and the biochemical mechanisms of carbon fixation in these microorganisms is poorly understood. In this project, we will investigate the carbon sequestration behavior of Synechococcus Sp., an abundant marine cyanobacteria known to be important to environmental responses to carbon dioxide levels, through experimental and computational methods. This project is a combined experimental and computational effort with emphasis on developing and applying new computational tools and methods. Our experimental effort will provide the biology and data to drive the computational efforts and include significant investment in developing new experimental methods for uncovering protein partners, characterizing protein complexes, identifying new binding domains. We will also develop and apply new data measurement and statistical methods for analyzing microamy experiments. Computational tools will be essential to our efforts to discover and characterize the function of the molecular machines of Synechococcus. To this end, molecular simulation methods will be coupled with knowledge discovery from diverse biological data sets for high-throughput discovery and characterization of protein-protein complexes. In

  18. ARRA NEPA Quarterly Report- Second Report: DOI: Central Utah Project

    Data.gov (United States)

    Council on Environmental Quality, Executive Office of the President — Reports prepared by the Departments and Agencies on status of NEPA progress for activities and projects funded under Division A of the American Recovery and...

  19. Nuclear materials stabilization and packaging. Quarterly status report, January 1--March 31, 1996

    Energy Technology Data Exchange (ETDEWEB)

    Haschke, J.M.; Horrell, D.R.; Hoth, C.W.; Fife, K.W.; Nielsen, J.B.; Pierce, S.W.; Ricketts, T.E.; Rink, N.A.; Robinson, M.A.

    1996-08-01

    This report documents progress on the Los Alamos Nuclear Materials Stabilization and Packaging projects for the second quarter of FY 1996. It covers development and production activities for the Plutonium Packaging Project, the Plutonium Recovery and Processing Project, and the Uranium Recovery and Processing Project. In addition, it reports on quality assurance activities for the Plutonium Packaging Project.

  20. CAREM Project Status

    Directory of Open Access Journals (Sweden)

    H. Boado Magan

    2011-01-01

    Full Text Available CAREM is a CNEA (Comisión Nacional de Energía Atómica project. This project consists of the development, design, and construction of a small nuclear power plant. First, a prototype of an electrical output of about 27 MW, CAREM 25, will be built in order to validate the innovation of the CAREM concept and then developed to commercial version. After several years of development, the CAREM Project reached such a maturity level that the Argentine government decided on the construction of CAREM prototype. Several activities are ongoing with the purpose of obtaining the construction permit for the CAREM prototype.

  1. Projects at the Western Environmental Technology Office. Quarterly technical progress report, January 1--March 31, 1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-06-01

    This quarterly report briefly describes recent progress in eight projects. The projects are entitled Biomass Remediation Project; Heavy Metal-Contaminated Soil Project; MHD Shutdown; Mine Waste Technology Program; Plasma Projects; Resource Recovery Project; Spray Casting Project; and Watervliet Arsenal Project.

  2. Projects at the Western Environmental Technology Office. Quarterly technical progress report, January 1--March 31, 1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-06-01

    This quarterly report briefly describes recent progress in eight projects. The projects are entitled Biomass Remediation Project; Heavy Metal-Contaminated Soil Project; MHD Shutdown; Mine Waste Technology Program; Plasma Projects; Resource Recovery Project; Spray Casting Project; and Watervliet Arsenal Project.

  3. Probe Project Status and Accomplishments

    Energy Technology Data Exchange (ETDEWEB)

    Burris, RD

    2001-05-07

    The Probe project has completed its first full year of operation. In this document we will describe the status of the project as of December 31, 2000. We will describe the equipment configuration, then give brief descriptions of the various projects undertaken to date. We will mention first those projects performed for outside entities and then those performed for the benefit of one of the Probe sites. We will then describe projects that are under consideration, including some for which initial actions have been taken and others which are somewhat longer-term.

  4. SELENE project status

    Indian Academy of Sciences (India)

    Konishi Hisahiro; Manabu Kato; Susumu Sasaki; Yoshisada Takizawa; Hitoshi Mizutani

    2005-12-01

    SELENE (Selenological and Engineering Explorer) project started as a joint mission of the former ISAS (Institute of Space and Astronautical Science) and the former NASDA (National Space Development Agency: the two organizations were merged into JAXA in 2002) of Japan in 1998. The launch target is rescheduled for 2006 due to delay of completion of launch vehicle, H-IIA. The SELENE project is now under a sustained design phase. The flight model components were manufactured, and the interface tests between the bus-system and the mission instruments were completed by the end of March 2004. The functional checks and calibration for the flight model components are being carried out at present. From the beginning of 2005, the final assembly tests will start.

  5. Status of Standardization Projects

    Science.gov (United States)

    1991-12-31

    PENTAERYTHRITOL MB DM F4 A 911 921 921 A MD MS 03 N C 6505 5486 A-A-XXX PENICILLIN G SUS MB DM F4 A 911 921 921 A MD MS 03 N C 6505 5489 A-A-XXX DEXAMETHASONE ... PHENYLBUTAZONE TABS MB DM H5 914 924 924 A MD MS 03 N 6605 TOTAL- 19. DELINQUENT- 4, STATUS CODES: A- 8, G- 1, Y- 0, Z- 10 6610 F119 MIL A 38138 AMP IND...921 921 A MD MS 03 N C 6505 5486 A-A-XXX PENICILLIN G SUS MB DM F4 A 911 921 921 A MD MS 03 N C 6505 5489 A-A-XXX DEXAMETHASONE SODIUM MB DM F4 A 911

  6. Status of the QCDOC project

    CERN Document Server

    Boyle, P A; Christ, N H; Cristian, C; Dong, Z; Gara, A; Joó, B; Kim, C; Levkova, L; Liao, X; Liu, G; Mawhinney, Robert D; Ohta, S; Wettig, T; Yamaguchi, A

    2002-01-01

    A status report is given of the QCDOC project, a massively parallel computer optimized for lattice QCD using system-on-a-chip technology. We describe several of the hardware and software features unique to the QCDOC architecture and present performance figures obtained from simulating the current VHDL design of the QCDOC chip with single-cycle accuracy.

  7. Program status 3. quarter -- FY 1990: Confinement systems programs

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1990-07-24

    Highlights of the DIII-D Research Operations task are: completed five weeks tokamak operations; initiated summer vent; achievement of 10.7% beta; carried out first dimensionless transport scaling experiment; completed IBW program; demonstrated divertor heat reduction with gas puffing; field task proposals presented to OFE; presentation of DIII-D program to FPAC; made presentation to Admiral Watkins; and SAN safety review. Summaries are given on research programs, operations, program development, hardware development, operations support and collaborative efforts. Brief summaries of progress on the International Cooperation task include: TORE SUPRA, ASDEX, JFT-2M, and JET. Funding for work on CIT physics was received this quarter. Several physics R and D planning tasks were initiated. Earlier in FY90, a poloidal field coil shaping system (PFC) was found for DIGNITOR. This quarter more detailed analysis has been done to optimize the design of the PFC system.

  8. Army Hearing Program Status Report Quarter 1 Fiscal Year 2017

    Science.gov (United States)

    2017-03-27

    responses recorded from the first quarter of fiscal year 2017 (Q1 FY17). The report contains tables of the responses aggregated by region and by the...offices and the industrial hygiene department to help accomplish this mission. HPMs should develop clear policies for ensuring that all personnel...Occupational Health Objectives for Fiscal Year 2016, 21 October 2015. Memorandum, Office of the Surgeon General, subject: Public Health Management System

  9. Program status 3. quarter -- FY 1994: ITER and technology

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-07-19

    During this quarter all technical work and documentation of the PULSAR design was completed. They also assisted UCLA in the planning of the DEMO program.In the area of RF technology, a decision was made to fabricate 4in x 4in gyrotron distributed window. An finally, they obtained good agreement between code predictions and measured data for the up and down field redeposition of tungsten in the DIMES-8 experiment.

  10. Western Gas Sands Project Quarterly Basin Activities Report

    Energy Technology Data Exchange (ETDEWEB)

    Atkinson, C H

    1979-04-30

    This quarterly basin activities report is a summation of three months drilling and testing activities in the Greater Green River Basin, Northern Great Plains Province, Piceance Basin, and Uinta Basin. Detailed information is given for each study area for the first quarter of 1979.

  11. Textile Status of the First Three Quarters in 2009

    Institute of Scientific and Technical Information of China (English)

    Nie Ting

    2009-01-01

    @@ In the first three quarters of 2009,the textile industry continued to maintain rising trend in general,and this trend is increasingly clear.Although the international market demand remains in the doldrums,the industry is still at the bottom of the export shock,the sector of production and investment continued to rise,profits rebounded significantly,the industry structure adjustment speeded; at the same time,the grim situation of employment has slowed down,the amount of labor in some sub-sectors began to pick up,the guiding principle of the state"maintaining growth,expanding domestic demand,readjusting the structure," had been better implemented,which made great contribution to macroeconomic recovery and social stability.

  12. Status of LLNL granite projects

    Energy Technology Data Exchange (ETDEWEB)

    Ramspott, L.D.

    1980-12-31

    The status of LLNL Projects dealing with nuclear waste disposal in granitic rocks is reviewed. This review covers work done subsequent to the June 1979 Workshop on Thermomechanical Modeling for a Hardrock Waste Repository and is prepared for the July 1980 Workshop on Thermomechanical-Hydrochemical Modeling for a Hardrock Waste Repository. Topics reviewed include laboratory determination of thermal, mechanical, and transport properties of rocks at conditions simulating a deep geologic repository, and field testing at the Climax granitic stock at the USDOE Nevada Test Site.

  13. Army Hearing Program Status Report Quarter 2 Fiscal Year 2017

    Science.gov (United States)

    2017-07-01

    U.S. Army Publ ic Heal th Center Army Hearing Program Status Report Q2 FY17 Clinical Public Health and Epidemiology Directorate Army...56               INTRODUCTION The Army Hearing Program Status Report (AHPSR) is a component of the Public Health ... required by Department of Defense Instruction (DoDI) 6055.12, Department of the Army Pamphlet (DA Pam) 40-501, and the Chief of Staff of the Army’s

  14. Army Hearing Program Status Report Quarter 3 Fiscal Year 2017

    Science.gov (United States)

    2017-09-14

    Health Administration (OSHA) 29 CFR 1904 and Department of Defense Instruction (DODI) 6055.12 require reporting of occupational hearing illness and...U.S. Army Publ ic Heal th Center Army Hearing Program Status Report Q3 FY17 Clinical Public Health and Epidemiology Directorate Army...Program Status Report (AHPSR) is a component of the Public Health Management System and provides a means for the installation Hearing Program Managers

  15. Status Report on SPARC Project

    Energy Technology Data Exchange (ETDEWEB)

    Renieri, A.; Carpanese, M.; Ciocci, F.; Dattoli, G.; Di Pace, A.; Doria, A.; Flora, F.; Gallerano, G.P.; Giannessi, L.; Giovenale, E.; Messina, G.; Mezi, L.; Ottaviani,; Pagnutti, S.; Parisi, G.; Picardi, L.; Quattromini, M.; Ronci, G.; Ronsivalle, C.; Sabia, E.; Sassi, M.; /ENEA, Frascati /Frascati /INFN, Milan /INFN, Rome /INFN, Rome2

    2005-06-10

    We review the status of FEL source activity of the ongoing SPARC FEL experiment, developed within the framework of a collaboration among ENEA, CNR, INFN, INFM, Sincrotrone Trieste and University of Rome Tor Vergata. The project is aimed at realizing a SASE-FEL source, operating in the visible (around 500 nm), with an extended range of tunability down to the VUV (100 nm) by the use of the mechanism of non-linear harmonic generation. The development of the relevant activities foresees the realization of an advanced 150 MeV photo-injector source, aimed at producing a high brightness electron beams, needed to drive a SASE-FEL experiment, and a 14 m long undulator. We present the status of the design and construction of SPARC FEL device. In particular we discuss the choice of the project parameters, their optimization and the sensitivity of the SPARC performance to any parameter variation. We will show, using start-to-end simulations, what is the impact of the e-beam and of the undulator parameters on the characteristics of the output laser field and in particular on the amount of the non-linearly generated power at higher harmonics.

  16. Status Report on SPARC Project

    CERN Document Server

    Renieri, Alberto; Ciocci, Franco; Dattoli, Giuseppe; Di Pace, Antonio; Doria, Andrea; Flora, Francesco; Gallerano, G P; Giannessi, Luca; Giovenale, Emilio; Messina, Giovanni; Mezi, Luca; Ottaviani, P L; Pagnutti, Simonetta; Parisi, Giovanni; Picardi, Luigi; Quattromini, Marcello; Ronci, Giuseppe; Ronsivalle, Concetta; Sabia, Elio; Sassi, Mauro; Zucchini, Alberto

    2004-01-01

    We review the status of FEL source activity of the on going SPARC FEL experiment, developed within the framework of a collaboration among ENEA, CNR, INFN, INFM, Sincrotrone Trieste and University of Rome Tor Vergata. The project is aimed at realising a SASE FEL source, operating in the visible (around 500 nm), with an extended range of tunability down to the VUV (100nm) by the use of the mechanism of non-linear harmonic generation. The development of the relevant activities foresees the realisation of an advanced 150 MeV photo-injector source, aimed at producing a high brightness electron beams, needed to drive a SASE-FEL experiment and a 12 m long undulator. We present the status of the design and construction of the injector, of the undulator and of the e-beam transport line. In particular we discuss the choice of the project parameters, their optimisation and the sensitivity of the SPARC performance to any parameter variation. We will show, using start to-end simulations, what is the impact of the e-beam a...

  17. National Ignition Facility Quarterly Status Report Second Quarter 2000, Jan-Mar 2000

    Energy Technology Data Exchange (ETDEWEB)

    Moses, E.

    2000-04-30

    The Project provides for the design, procurement, construction, assembly, installation, and acceptance testing of the National Ignition Facility (NIF), an experimental inertial confinement fusion facility intended to achieve controlled thermonuclear fusion in the laboratory by imploding a small capsule containing a mixture of the hydrogen isotopes deuterium and tritium. The NIF will be constructed at the Lawrence Livermore National Laboratory (LLNL), Livermore, California as determined by the Record of Decision made on December 19, 1996, as a part of the Stockpile Stewardship and Management Programmatic Environmental Impact Statement.

  18. National Ignition Facility Quarterly Status Report - First Quarter 2000, Dec 1999

    Energy Technology Data Exchange (ETDEWEB)

    Yatabe, J.

    2000-01-30

    The Project provides for the design, procurement, construction, assembly, installation, and acceptance testing of the National Ignition Facility (NIF), an experimental inertial confinement fusion facility intended to achieve controlled thermonuclear fusion in the laboratory by imploding a small capsule containing a mixture of the hydrogen isotopes deuterium and tritium. The NIF will be constructed at the Lawrence Livermore National Laboratory (LLNL), Livermore, California as determined by the Record of Decision made on December 19, 1996, as a part of the Stockpile Stewardship and Management Programmatic Environmental Impact Statement (SSM PEIS).

  19. ARM Climate Research Facility Quarterly Ingest Status Report

    Energy Technology Data Exchange (ETDEWEB)

    Koontz, A. [DOE ARM Climate Research Facility, Washington, DC (United States); Sivaraman, C. [DOE ARM Climate Research Facility, Washington, DC (United States)

    2016-10-01

    The purpose of this report is to provide a concise status update for ingests maintained by the Atmospheric Radiation Measurement (ARM) Climate Research Facility. The report is divided into the following sections: (1) new ingests for which development has begun, (2) progress on existing ingests, (3) future ingests that have been recently approved, (4) other work that leads to an ingest, and (5) top requested ingests from the ARM Data Archive. New information is highlighted in blue text.

  20. ARM Climate Research Facility Quarterly Ingest Status Report

    Energy Technology Data Exchange (ETDEWEB)

    Koontz, A. [ARM Climate Reesearch Facility, Washington, DC (United States); Sivaraman, C. [ARM Climate Reesearch Facility, Washington, DC (United States)

    2016-07-01

    The purpose of this report is to provide a concise status update for ingests maintained by the Atmospheric Radiation Measurement (ARM) Climate Research Facility. The report is divided into the following sections: (1) new ingests for which development has begun, (2) progress on existing ingests, (3) future ingests that have been recently approved, (4) other work that leads to an ingest, and (5) top requested ingests from the ARM Data Archive. New information is highlighted in blue text.

  1. 21st Century Locomotive Technology: Quarterly Technical Status Report 28

    Energy Technology Data Exchange (ETDEWEB)

    Lembit Salasoo; Ramu Chandra

    2010-02-19

    Thermal testing of a subscale locomotive sodium battery module was initiated.to validate thermal models. The hybrid trip optimizer problem was formulated. As outcomes of this project, GE has proceeded to commercialize trip optimizer technology, and has initiated work on a state-of-the-art battery manufacturing plant for high energy density, sodium-based batteries.

  2. Tampa Electric Company Polk Power Station IGCC project: Project status

    Energy Technology Data Exchange (ETDEWEB)

    McDaniel, J.E.; Carlson, M.R.; Hurd, R.; Pless, D.E.; Grant, M.D. [Tampa Electric Co., FL (United States)

    1997-12-31

    The Tampa Electric Company Polk Power Station is a nominal 250 MW (net) Integrated Gasification Combined Cycle (IGCC) power plant located to the southeast of Tampa, Florida in Polk County, Florida. This project is being partially funded under the Department of Energy`s Clean Coal Technology Program pursuant to a Round II award. The Polk Power Station uses oxygen-blown, entrained-flow IGCC technology licensed from Texaco Development Corporation to demonstrate significant reductions of SO{sub 2} and NO{sub x} emissions when compared to existing and future conventional coal-fired power plants. In addition, this project demonstrates the technical feasibility of commercial scale IGCC and Hot Gas Clean Up (HGCU) technology. The Polk Power Station achieved ``first fire`` of the gasification system on schedule in mid-July, 1996. Since that time, significant advances have occurred in the operation of the entire IGCC train. This paper addresses the operating experiences which occurred in the start-up and shakedown phase of the plant. Also, with the plant being declared in commercial operation as of September 30, 1996, the paper discusses the challenges encountered in the early phases of commercial operation. Finally, the future plans for improving the reliability and efficiency of the Unit in the first quarter of 1997 and beyond, as well as plans for future alternate fuel test burns, are detailed. The presentation features an up-to-the-minute update on actual performance parameters achieved by the Polk Power Station. These parameters include overall Unit capacity, heat rate, and availability. In addition, the current status of the start-up activities for the HGCU portion of the plant is discussed.

  3. Basalt Waste Isolation Project. Quarterly report, July 1, 1981-September 30, 1981

    Energy Technology Data Exchange (ETDEWEB)

    Deju, R.A.

    1981-11-01

    This document reports progress made in the Basalt Waste Isolation Project during the fourth quarter of fiscal year 1981. Efforts are described for the following programs of the project work breakdown structure: systems, waste package, site, repository, regulatory and institutional, test facilities, and in-situ test facilities.

  4. Basalt waste isolation project. Quarterly report, April 1, 1981-June 30, 1981

    Energy Technology Data Exchange (ETDEWEB)

    Deju, R.A.

    1981-08-01

    This document reports progress made in the Basalt Waste Isolation Project during the third quarter of fiscal year 1981. Efforts are described for the following programs of the project work breakdown structure: systems; waste package; site; repository; regulatory and institutional; test facilities; in situ test facilities.

  5. Basalt Waste Isolation Project. Quarterly report, July 1, 1980-September 30, 1980

    Energy Technology Data Exchange (ETDEWEB)

    Deju, R.A.

    1980-11-01

    This report presents the technical progress for the Basalt Waste Isolation Project for the fourth quarter of fiscal year 1980. The overall Basalt Waste Isolation Project is divided into the following principal work areas: systems integration; geosciences; hydrology; engineered barriers; near-surface test facility; engineering testing; and repository studies. Summaries of major accomplishments for each of these areas are reported.

  6. Program status 3. quarter -- FY 1994: Confinement systems programs

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-07-19

    Highlights of the DIII-D Research Operations are: began experimental research operations; successfully passed radiative divertor project review; presented papers at PSI, Diagnostics, and EPS meetings and prepared IAEA synopses; new computer speeds up data acquisition; completed installation of FWCD antennas with Faraday shields; and completed report of radiative divertor preliminary design with review committee. Summaries are given for progress in research programs; operations; mechanical engineering; electrical engineering; upgrade project; operations support; and collaborative efforts. Brief summaries are given for progress on the International Cooperation task which include JET, ASDEX, TEXTOR, TORE SUPRA, JAERI, TRINTI, T-10, and ARIES support. The work in support of the development plan for the TPX (Tokamak Physics Experiment) goals and milestones continued. Progress in improving on existing models and codes leading to improved understanding of experiments is given. Highlights from the User Service Center are: 18 gigabytes of disks were purchased for exclusive fusion use; a Hewlett-Packard 9000 Series 800 T500 computer was selected as the fusion complete server; the first VAX was removed from the USC cluster; security vulnerability on HP VUE software was corrected; and a cleanup script was developed for the NERSC Cray system. A list of personnel and their assignments is given for the ITER Design Engineering task.

  7. Geothermal policy project. Quarterly report, August 1-October 31, 1979

    Energy Technology Data Exchange (ETDEWEB)

    Sacarto, D.M.

    1979-11-01

    The NCSL geothermal policy project continued with initiating geothermal studies in new project states and furthering policy development in existing states. Activities of the project staff are reviewed. (MHR)

  8. Geothermal policy project. Quarterly report, June 1-August 31, 1980

    Energy Technology Data Exchange (ETDEWEB)

    Connor, T.D.

    1980-11-01

    Efforts continued to initiate geothermal and water source heat pump study activities in newly selected project states and to carry forward policy development in existing project states. Follow-up contacts were made with several project states, and state meetings and workshops were held in nine project states. Two state-specific documents were prepared during this reporting period, for Nevada and Wyoming.

  9. Aircraft Nuclear Propulsion Project Quarterly Progress Report for Period Ending December 31, 1956

    Energy Technology Data Exchange (ETDEWEB)

    NA, NA [ORNL

    1957-03-12

    This quarterly progress report of the Aircraft Nuclear Propulsion Project at ORNL records the technical progress of research on circulating-fuel reactors and other ANP research at the Laboratory. The report is divided into five major parts: 1) Aircraft Reactor Engineering, 2) Chemistry, and 3) Metallurgy, 4) Heat Transfer and Physical Properties, Radiation Damage, and Fuel Recovery and Reprocessing, and 5) Reactor Shielding.

  10. Basalt Waste Isolation Project. Quarterly report, July 1, 1979-September 30, 1979

    Energy Technology Data Exchange (ETDEWEB)

    Deju, R.A.

    1979-10-01

    Progress in various areas of the Basalt Waste Isolation Project during the last quarter is reported. Systems integration, licensing, geologic activities, hydrology, borehole studies, geophysical logging, engineered barriers, test facilities, testing of canisters, and selection process for architect-engineer services for repository conceptual design are discussed. (DC)

  11. DOE/FETC GASIS project. Quarterly report, September 1--November 30, 1997

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-12-31

    This report summarizes technical progress on the GASIS [Gas AtlaS Information System] project during the quarter. During this period, work was performed on Task 3: Natural gas reservoir data system development, Task 4: Technology transfer, Task 8: Reservoir data system updates, and Task 9: Supplemental reservoir studies.

  12. National Bioenergy Center - Biochemical Platform Integration Project: Quarterly Update, Winter 2010

    Energy Technology Data Exchange (ETDEWEB)

    Schell, D.

    2011-02-01

    Winter 2011 edition of the National Bioenergy Center's Biochemical Platform Integration Project quarterly newsletter. Issue topics: 33rd Symposium on Biotechnology for Fuels and Chemicals program topic areas; results from reactive membrane extraction of inhibitors from dilute-acid pretreated corn stover; list of 2010 task publications.

  13. Geothermal policy project. Quarterly report, March 1-May 30, 1980

    Energy Technology Data Exchange (ETDEWEB)

    Connor, T.D.

    1980-06-01

    Efforts continued to initiate geothermal and groundwater heat pump study activities in newly selected project states and to carry forward policy development in existing project states. Minnesota and South Carolina have agreed to a groundwater heat pump study, and Maryland and Virginia have agreed to a follow-up geothermal study in 1980. Follow-up contacts were made with several other existing project states and state meetings and workshops were held in eleven project states. Two generic documents were prepared, the Geothermal Guidebook and the Guidebook to Groundwater Heat Pumps, in addition to several state-specific documents.

  14. Geothermal policy project. Quarterly report, March 1-May 30, 1980

    Energy Technology Data Exchange (ETDEWEB)

    Connor, T.D.

    1980-06-01

    Efforts continued to initiate geothermal and groundwater heat pump study activities in newly selected project states and to carry forward policy development in existing project states. Minnesota and South Carolina have agreed to a groundwater heat pump study, and Maryland and Virginia have agreed to a follow-up geothermal study in 1980. Follow-up contacts were made with several other existing project states and state meetings and workshops were held in eleven project states. Two generic documents were prepared, the Geothermal Guidebook and the Guidebook to Groundwater Heat Pumps, in addition to several state-specific documents.

  15. Status of the apeNEXT project

    CERN Document Server

    Ammendola, R; Boucaud, P; Cabibbo, Nicola; Carlo, F D; De Pietri, R; Renzo, F D; Errico, W; Fucci, A; Guagnelli, M; Kaldass, H; Lonardo, A; De Luca, S; Micheli, J; Morénas, V; Pène, O; Petronzio, Roberto; Palombi, Filippo; Pleiter, D; Paschedag, N; Rapuano, F; De Riso, P; Salamon, A; Salina, G; Sartori, L; Schifano, F; Simma, H; Tripiccione, R; Vicini, P; Boucaud, Ph.; 10.1016/S0920-5632(03)01755-9

    2003-01-01

    We present the current status of the apeNEXT project. Aim of this project is the development of the next generation of APE machines which will provide multi-teraflop computing power. Like previous machines, apeNEXT is based on a custom designed processor, which is specifically optimized for simulating QCD. We discuss the machine design, report on benchmarks, and give an overview on the status of the software development.

  16. The apeNEXT project (Status report)

    CERN Document Server

    Bodin, F; Cabibbo, Nicola; Carlo, F D; De Luca, S; De Pietri, R; Kaldass, H; Lonardo, A; Micheli, J; Morénas, V; Paschedag, N; Pleiter, D; Pène, O; Rapuano, F; Renzo, F D; Sartori, L; Schifano, F; Simma, H; Tripiccione, R; Vicini, P; Boucaud, Ph.

    2003-01-01

    We present the current status of the apeNEXT project. Aim of this project is the development of the next generation of APE machines which will provide multi-teraflop computing power. Like previous machines, apeNEXT is based on a custom designed processor, which is specifically optimized for simulating QCD. We discuss the machine design, report on benchmarks, and give an overview on the status of the software development.

  17. Quarterly project status report, January-March 1981

    Energy Technology Data Exchange (ETDEWEB)

    1981-01-01

    The Department of Energy's (DOE), Economic Regualtory Administration (ERA), Office of Utility Systems (OUS), Division of Rates and Energy Management (DREM), stated a requirement to report to Congress on determinations made by State regulatory authorities and nonregulated utilities regarding purposes of Titles I and III of the Public Regulatory Policies Act (PURPA) of 1978. Progress in providing support to ERA by assisting technically and administratively in implementing ERA's information data base to their user audience is reported. The activities in this program are related to: information acquisition/dissemination; information analysis and retrieval; information storage; and information maintenance.

  18. Status of Standardization Projects, Quarter Ending 31 December 1992

    Science.gov (United States)

    1992-12-31

    CAPS MB DM H5 914 924 931 G MD MS 03 U 6505 5568 MIL-N-37847 NEOMYCIN SUSPENSION MB DM H5 914 924 931 G MD MS 03 U 6505 5571 JAN P 567 PIGMENT SYNTHETIC...A SM SA 69 DH U 8135 0654 A-A-XXXX VERMICULITE ABSORBENT SM B4 A 922 923 923 A SM N C 8135 0658 A-A-1252A PAD MEAT AND POULTRY PAPER MCA GL G2 924 931...G1- SA 69 GS U 8135 0638 PPP T 450 TAPE GUMMED PAPER REIN AND PLA GL H5 911 921 921 A GL OS 69 GS N C 8135 0658 A-A-1252A PAD MEAT AND POULTRY PAPER

  19. Status of Standardization Projects, Quarter Ending 30 June 1992

    Science.gov (United States)

    1992-06-30

    N 8940 A724 NIL H XXX GL HAM AND CHEESE FONDUE POW GL B4 922 932 932 A GL NS 8940 A725 NIL P XXX GL POTATOES LYONNAISE POW GL 84 922 932 932 A GL N...922 932 932 A GL N 8940 A699 NIL P 44182GL NOT 2 POTATOES MASHED POW GL F2 922 932 932 A GL N 8940 A700 MJIL A XXX GL APPLE BROWN BETTY POWDER GL B4...932 A GL N 8940 A708 NIL P 44182GL NOT 1 POTATOES MASHED POW GL B5 922 932 932 A GL N 8940 A709 NIL S 44170 GL NOT 1 SPAGHETTI SAUCE GL 85 922 923 923

  20. UNFINISHED JOURNEY Project. Quarterly report, April 1995--June 1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-02-01

    In September, 1994, the U.S. Department of Energy (Nevada Operations Office) made a $199,708 grant (through the Mathematics, Science, and Technology Education Program), to the UNFINISHED JOURNEY Project. The Project began in April, 1994 to develop and implement an innovative model of student outreach by San Jose State University (SJSU) to underserved, underrepresented student populations of the East Side Union High School District (ESUHSD). The Project was formed by a consortium involving SJSU, ESUHSD, some 20 private sector organizations (foundations/corporations), numerous local community/professional organizations, and approximately 100 private funders. This proposal to the U.S. Department of Energy was to have the Department join this unique partnership to focus University outreach to underserved student populations to pursue careers in mathematics, science, and technology.

  1. UNFINISHED JOURNEY Project. Quarterly report, July 1995--September 1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-02-01

    In September, 1994, the U.S. Department of Energy (Nevada Operations Office) made a $199,708 grant (through the Mathematics, Science, and Technology Education Program), to the UNFINISHED JOURNEY Project. The Project began in April, 1994, to develop and implement an innovative model of student outreach by San Jose State University (SJSU) to underserved, underrepresented student populations of the East Side Union High School District (ESUHSD). The Project was formed by a consortium involving SJSU, ESUHSD, some 20 private sector organizations (foundations/corporations), numerous local community/professional organizations, and approximately 100 private funders. This proposal to the U.S. Department of Energy was to have the Department join this unique partnership to focus University outreach to underserved student populations to pursue careers in mathematics, science, and technology.

  2. UNFINISHED JOURNEY Project. Quarterly report, September 1994--December 1994

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-02-01

    In September, 1994, the U.S. Department of Energy (Nevada Operations Office) made a $199,708 grant (through the Mathematics, Science, and Technology Education Program), to the UNFINISHED JOURNEY Project. The Project began in April, 1994, to develop and implement an innovative model of student outreach by San Jose State University (SJSU) to underserved, underrepresented student populations of the East Side Union High School District (ESUHSD). The Project was formed by a consortium involving SJSU, ESUHSD, some 20 private sector organizations (foundations/corporations), numerous local community/professional organizations, and approximately 100 private funders. This proposal to the U.S. Department of Energy was to have the Department join this unique partnership to focus University outreach to underserved student populations to pursue careers in mathematics, science, and technology.

  3. The TEMPIS Project: Current Status,

    Science.gov (United States)

    1987-06-19

    GRA&I 9 [ Valiente 19871 jC A 10 [Aba 1986AJ tnannounced ŕ [Ahn~ 1986B] oation- Table 1: Status of Subtasks Distribut on/ ____ Avail and/or 3 WkM On...W ~~ -tt-,u Rr ~~ n~ m1 Nn VJs -W r a -VW uS ru-p-urp-Vf U, 8 39. [ Valiente 19871 Valiente , J. Implementing TQuel Aggregates (in progress). Master’s

  4. Minnesota agripower project. Quarterly report, April--June 1997

    Energy Technology Data Exchange (ETDEWEB)

    Baloun, J.

    1997-07-01

    The Minnesota Valley Alfalfa Producers (MnVAP) propose to build an alfalfa processing plant integrated with an advanced power plant system at the Granite Falls, Minnesota Industrial Park to provide 75 MW of base load electric power and a competitively priced source of value added alfalfa based products. This project will utilize air blown fluidized bed gasification technology to process alfalfa stems and another biomass to produce a hot, clean, low heating value gas that will be used in a gas turbine. Exhaust heat from the gas turbine will be used to generate steam to power a steam turbine and provide steam for the processing of the alfalfa leaf into a wide range of products including alfalfa leaf meal, a protein source for livestock. The plant will demonstrate high efficiency and environmentally compatible electric power production, as well as increased economic yield from farm operations in the region. The initial phase of the Minnesota Agripower Project (MAP) will be to perform alfalfa feedstock testing, prepare preliminary designs, and develop detailed plans with estimated costs for project implementation. The second phase of MAP will include detailed engineering, construction, and startup. Full commercial operation will start in 2001.

  5. Geothermal direct-heat utilization assistance. Quarterly project progress report, January--March 1994

    Energy Technology Data Exchange (ETDEWEB)

    1994-05-01

    The Geo-Heat Center provides technical assistance on geothermal direct heat applications to developers, consultants and the public which could include: data and information on low-temperature (< 1500 C) resources, space and district heating, geothermal heat pumps, greenhouses, aquaculture, industrial processes and other technologies. This assistance could include preliminary engineering feasibility studies, review of direct-use project plans, assistance in project material and equipment selection, analysis and solutions of project operating problems, and information on resources and utilization. The following are brief descriptions of technical assistance provided during the second quarter of the program.

  6. The University of Rochester Atomic Energy Project quarterly report, April 1, 1950--June 30, 1950

    Energy Technology Data Exchange (ETDEWEB)

    Blair, H.A.

    1950-12-31

    This quarterly progress report gives an overview of the University of Rochester Atomic Energy Project for April 1, 1950 thru June 30, 1950. Sections included are entitled (1) Biological Effects of External Radiation (X-rays and gamma rays), (2) Biological Effects of External Radiation (Infra-red and ultraviolet), (3) Biological effects of radioactive materials (polonium, radon, thoron, and miscellaneous project materials), (4) Uranium, (5) Beryllium, (7) thorium, (8) fluoride, (9) zirconium, (10) special materials, (11) Isotopes, (12) Outside services, (12) Project health, (13) Health physics, (14) Special Clinical Service, and (15) Instrumentation (Spectroscopy, electron microscopy, x-ray and nuclear radiation detectors, x-ray diffraction, and electronics).

  7. Medical Data Architecture Project Status

    Science.gov (United States)

    Krihak, M.; Middour, C.; Lindsey, A.; Marker, N.; Wolfe, S.; Winther, S.; Ronzano, K.; Bolles, D.; Toscano, W.; Shaw, T.

    2017-01-01

    The Medical Data Architecture (MDA) project supports the Exploration Medical Capability (ExMC) risk to minimize or reduce the risk of adverse health outcomes and decrements in performance due to in-flight medical capabilities on human exploration missions. To mitigate this risk, the ExMC MDA project addresses the technical limitations identified in ExMC Gap Med 07: We do not have the capability to comprehensively process medically-relevant information to support medical operations during exploration missions. This gap identifies that the current International Space Station (ISS) medical data management includes a combination of data collection and distribution methods that are minimally integrated with on-board medical devices and systems. Furthermore, there are variety of data sources and methods of data collection. For an exploration mission, the seamless management of such data will enable an increasingly autonomous crew than the current ISS paradigm. The MDA will develop capabilities that support automated data collection, and the necessary functionality and challenges in executing a self-contained medical system that approaches crew health care delivery without assistance from ground support. To attain this goal, the first year of the MDA project focused on reducing technical risk, developing documentation and instituting iterative development processes that established the basis for the first version of MDA software (or Test Bed 1). Test Bed 1 is based on a nominal operations scenario authored by the ExMC Element Scientist. This narrative was decomposed into a Concept of Operations that formed the basis for Test Bed 1 requirements. These requirements were successfully vetted through the MDA Test Bed 1 System Requirements Review, which permitted the MDA project to begin software code development and component integration. This paper highlights the MDA objectives, development processes, and accomplishments, and identifies the fiscal year 2017 milestones and

  8. Genomes to life project : quarterly report October 2003.

    Energy Technology Data Exchange (ETDEWEB)

    Heffelfinger, Grant S.

    2004-01-01

    This SAND report provides the technical progress through October 2003 of the Sandia-led project, 'Carbon Sequestration in Synechococcus Sp.: From Molecular Machines to Hierarchical Modeling,' funded by the DOE Office of Science Genomes to Life Program. Understanding, predicting, and perhaps manipulating carbon fixation in the oceans has long been a major focus of biological oceanography and has more recently been of interest to a broader audience of scientists and policy makers. It is clear that the oceanic sinks and sources of CO2 are important terms in the global environmental response to anthropogenic atmospheric inputs of CO2 and that oceanic microorganisms play a key role in this response. However, the relationship between this global phenomenon and the biochemical mechanisms of carbon fixation in these microorganisms is poorly understood. In this project, we will investigate the carbon sequestration behavior of Synechococcus Sp., an abundant marine cyanobacteria known to be important to environmental responses to carbon dioxide levels, through experimental and computational methods. This project is a combined experimental and computational effort with emphasis on developing and applying new computational tools and methods. Our experimental effort will provide the biology and data to drive the computational efforts and include significant investment in developing new experimental methods for uncovering protein partners, characterizing protein complexes, identifying new binding domains. We will also develop and apply new data measurement and statistical methods for analyzing microarray experiments. Computational tools will be essential to our efforts to discover and characterize the function of the molecular machines of Synechococcus. To this end, molecular simulation methods will be coupled with knowledge discovery from diverse biological data sets for high-throughput discovery and characterization of protein-protein complexes. In addition, we will

  9. Genomes to Life Project Quarterly Report April 2005.

    Energy Technology Data Exchange (ETDEWEB)

    Heffelfinger, Grant S.; Martino, Anthony; Rintoul, Mark Daniel; Geist, Al; Gorin, Andrey; Xu, Ying; Palenik, Brian

    2006-02-01

    This SAND report provides the technical progress through April 2005 of the Sandia-led project, "Carbon Sequestration in Synechococcus Sp.: From Molecular Machines to Hierarchical Modeling," funded by the DOE Office of Science Genomics:GTL Program. Understanding, predicting, and perhaps manipulating carbon fixation in the oceans has long been a major focus of biological oceanography and has more recently been of interest to a broader audience of scientists and policy makers. It is clear that the oceanic sinks and sources of CO2 are important terms in the global environmental response to anthropogenic atmospheric inputs of CO2 and that oceanic microorganisms play a key role in this response. However, the relationship between this global phenomenon and the biochemical mechanisms of carbon fixation in these microorganisms is poorly understood. In this project, we will investigate the carbon sequestration behavior of Synechococcus Sp., an abundant marine cyanobacteria known to be important to environmental responses to carbon dioxide levels, through experimental and computational methods. This project is a combined experimental and computational effort with emphasis on developing and applying new computational tools and methods. Our experimental effort will provide the biology and data to drive the computational efforts and include significant investment in developing new experimental methods for uncovering protein partners, characterizing protein complexes, identifying new binding domains. We will also develop and apply new data measurement and statistical methods for analyzing microarray experiments. Computational tools will be essential to our efforts to discover and characterize the function of the molecular machines of Synechococcus. To this end, molecular simulation methods will be coupled with knowledge discovery from diverse biological data sets for high-throughput discovery and characterization of protein-protein complexes. In addition, we will develop a set of

  10. Genomes to life project quarterly report June 2004.

    Energy Technology Data Exchange (ETDEWEB)

    Heffelfinger, Grant S.

    2005-01-01

    This SAND report provides the technical progress through June 2004 of the Sandia-led project, ''Carbon Sequestration in Synechococcus Sp.: From Molecular Machines to Hierarchical Modeling'', funded by the DOE Office of Science Genomes to Life Program. Understanding, predicting, and perhaps manipulating carbon fixation in the oceans has long been a major focus of biological oceanography and has more recently been of interest to a broader audience of scientists and policy makers. It is clear that the oceanic sinks and sources of CO{sub 2} are important terms in the global environmental response to anthropogenic atmospheric inputs of CO{sub 2} and that oceanic microorganisms play a key role in this response. However, the relationship between this global phenomenon and the biochemical mechanisms of carbon fixation in these microorganisms is poorly understood. In this project, we will investigate the carbon sequestration behavior of Synechococcus Sp., an abundant marine cyanobacteria known to be important to environmental responses to carbon dioxide levels, through experimental and computational methods. This project is a combined experimental and computational effort with emphasis on developing and applying new computational tools and methods. Our experimental effort will provide the biology and data to drive the computational efforts and include significant investment in developing new experimental methods for uncovering protein partners, characterizing protein complexes, identifying new binding domains. We will also develop and apply new data measurement and statistical methods for analyzing microarray experiments. Computational tools will be essential to our efforts to discover and characterize the function of the molecular machines of Synechococcus. To this end, molecular simulation methods will be coupled with knowledge discovery from diverse biological data sets for high-throughput discovery and characterization of protein-protein complexes

  11. Genomes to Life Project Quarterly Report April 2005.

    Energy Technology Data Exchange (ETDEWEB)

    Heffelfinger, Grant S.; Martino, Anthony; Rintoul, Mark Daniel; Geist, Al; Gorin, Andrey; Xu, Ying; Palenik, Brian

    2006-02-01

    This SAND report provides the technical progress through April 2005 of the Sandia-led project, "Carbon Sequestration in Synechococcus Sp.: From Molecular Machines to Hierarchical Modeling," funded by the DOE Office of Science Genomics:GTL Program. Understanding, predicting, and perhaps manipulating carbon fixation in the oceans has long been a major focus of biological oceanography and has more recently been of interest to a broader audience of scientists and policy makers. It is clear that the oceanic sinks and sources of CO2 are important terms in the global environmental response to anthropogenic atmospheric inputs of CO2 and that oceanic microorganisms play a key role in this response. However, the relationship between this global phenomenon and the biochemical mechanisms of carbon fixation in these microorganisms is poorly understood. In this project, we will investigate the carbon sequestration behavior of Synechococcus Sp., an abundant marine cyanobacteria known to be important to environmental responses to carbon dioxide levels, through experimental and computational methods. This project is a combined experimental and computational effort with emphasis on developing and applying new computational tools and methods. Our experimental effort will provide the biology and data to drive the computational efforts and include significant investment in developing new experimental methods for uncovering protein partners, characterizing protein complexes, identifying new binding domains. We will also develop and apply new data measurement and statistical methods for analyzing microarray experiments. Computational tools will be essential to our efforts to discover and characterize the function of the molecular machines of Synechococcus. To this end, molecular simulation methods will be coupled with knowledge discovery from diverse biological data sets for high-throughput discovery and characterization of protein-protein complexes. In addition, we will develop a set of

  12. Smart-1 Project Development Status

    Science.gov (United States)

    Racca, G. D.; Foing, B. H.; SMART-1 Project Team

    SMART-1 is the first of the Small Missions for Advanced Research in Technology of the ESA Horizons 2000 Science Plan. The main mission objective of SMART-1 is to demonstrate key technologies for Bepi-Colombo and other scientific deep-space missions. One of the key technologies is the solar electric propulsion used as primary propulsion. The electric propulsion will be using 1400W to transfer the 350 kg space- craft from an Ariane-5 standard GTO to an elliptic Moon polar orbit, 10000x300 km. The total mission time is 24 months including a maximum of 18 months transfer time. The spacecraft development entered the detailed design and implementation phase in October 1999, under the responsibility of the Swedish Space Corporation as prime contractor, and the flight acceptance is targeted for the end of 2002. Apart from the in-orbit demonstration of electric propulsion as primary propulsion, SMART-1 is im- plementing many other enabling technologies for deep-space missions. In addition, the spacecraft avionics design is tailored to the low cost philosophy by enabling flexi- ble integration of Commercial Off The Shelf (COTS) equipment. The scientific instru- ments support the characterisation of the electric propulsion thrust environment during the long transfer phase and detailed imaging and spectroscopy of the lunar surface in visible, infrared and X-ray during the Moon orbiting phase. The paper summarises the baseline mission and spacecraft design. The main part of the paper highlights the spacecraft design status and the assembly, integration and verification activities.

  13. Status of the SPARC Project

    CERN Document Server

    Serafini, Luca; Alessandria, Franco; Bacci, Alberto; Bellaveglia, Marco; Bertolucci, Sergio; Biagini, Maria; Boni, Roberto; Boscolo, Ilario; Boscolo, Manuela; Broggi, Francesco; Castellano, Michele; Catani, Luciano; Chiadroni, Enrica; Cialdi, Simone; Cianchi, Alessandro; Ciocci, Franco; Clozza, Alberto; Dattoli, Giuseppe; De Martinis, Carlo; Di Pirro, Giampiero; Dipace, Antonio; Doria, Andrea; Dowell, David; Drago, Alessandro; Emma, Paul; Esposito, Adolfo; Ferrario, Massimo; Ficcadenti, L; Filippetto, Daniele; Flora, F; Fusco, Valeria; Gabrielli, E; Gallerano, Gian P; Gallo, Alessandro; Gatti, Giancarlo; Ghigo, Andrea; Giannessi, Luca; Giove, Dario; Giovenale, Emilio; Guiducci, Susanna; Incurvati, Maurizio; Levi, Decio; Ligi, Carlo; Limborg-Deprey, Cecile; Marcellini, Fabio; Maroli, Cesare; Mattioli, Mario; Mauri, Marco; Medici, G; Messina, Giovanni; Migliorati, Mauro; Mostacci, Andrea; Musumeci, Pietro; Nisoli, Mauro; Ottaviani, P L; Pagnutti, Simonetta; Palumbo, Luigi; Parisi, Giovanni; Pellegrino, Luigi; Pelliccia, Daniele; Petrarca, Massimo; Petrillo, Vittoria; Picardi, Luigi; Preger, Miro; Quattromini, Marcello; Renieri, Alberto; Ricci, Ruggero; Rome, Massimiliano; Ronci, G; Ronsivalle, Concetta; Rosenzweig, James E; Rosetti, Maurizio; Sabia, Elio; Sanelli, Claudio; Sassi, Mauro; Serio, Mario; Sgamma, Francesco; Spataro, Bruno; Stagira, Salvatore; Stecchi, Alessandro; Stella, Angelo; Tazzari, Sergio; Tazzioli, Franco; Thomas Palmer, Dennis; Torre, A; Vaccarezza, Cristina; Vescovi, Mario; Vicario, Carlo; Zucchini, Alberto; de Silvestri, Sandro

    2005-01-01

    The SPARC project has entered its installation phase at INFN-LNF: its main goal is the promotion of an R&D activity oriented to the development of a high brightness photoinjector to drive SASE-FEL experiments. The design of the 150 MeV photoinjector has been completed and the construction of its main components is in progress, as well as the design of the 12 m undulator. In this paper we will report on the installation and test of some major components, like the Ti:Sa laser system to drive the photo-cathode, the RF gun, the RF power system, as well as some test results on the RF deflector and 4th harmonic X-band cavity prototypes. Advancements in the control and beam diagnostics systems will also be reported, in particular on the emittance-meter device for beam emittance measurements in the drift space downstream the RF gun. Recent results on laser pulse shaping, obtained with two alternative techniques (DAZZLER and Liquid Crystal Mask), show the feasibility of producing 10 ps flat-top laser pulses in the...

  14. National Bioenergy Center, Biochemical Platform Integration Project: Quarterly Update, Winter 2011-2012 (Newsletter)

    Energy Technology Data Exchange (ETDEWEB)

    2012-04-01

    Winter 2011-2012 issue of the National Bioenergy Center Biochemical Platform Integration Project quarterly update. Issue topics: 34th Symposium on Biotechnology for Fuels and Chemicals; feasibility of NIR spectroscopy-based rapid feedstock reactive screening; demonstrating integrated pilot-scale biomass conversion. The Biochemical Process Integration Task focuses on integrating the processing steps in enzyme-based lignocellulose conversion technology. This project supports the U.S. Department of Energy's efforts to foster development, demonstration, and deployment of 'biochemical platform' biorefineries that economically produce ethanol or other fuels, as well as commodity sugars and a variety of other chemical products, from renewable lignocellulosic biomass.

  15. The ITER project construction status

    Science.gov (United States)

    Motojima, O.

    2015-10-01

    The pace of the ITER project in St Paul-lez-Durance, France is accelerating rapidly into its peak construction phase. With the completion of the B2 slab in August 2014, which will support about 400 000 metric tons of the tokamak complex structures and components, the construction is advancing on a daily basis. Magnet, vacuum vessel, cryostat, thermal shield, first wall and divertor structures are under construction or in prototype phase in the ITER member states of China, Europe, India, Japan, Korea, Russia, and the United States. Each of these member states has its own domestic agency (DA) to manage their procurements of components for ITER. Plant systems engineering is being transformed to fully integrate the tokamak and its auxiliary systems in preparation for the assembly and operations phase. CODAC, diagnostics, and the three main heating and current drive systems are also progressing, including the construction of the neutral beam test facility building in Padua, Italy. The conceptual design of the Chinese test blanket module system for ITER has been completed and those of the EU are well under way. Significant progress has been made addressing several outstanding physics issues including disruption load characterization, prediction, avoidance, and mitigation, first wall and divertor shaping, edge pedestal and SOL plasma stability, fuelling and plasma behaviour during confinement transients and W impurity transport. Further development of the ITER Research Plan has included a definition of the required plant configuration for 1st plasma and subsequent phases of ITER operation as well as the major plasma commissioning activities and the needs of the accompanying R&D program to ITER construction by the ITER parties.

  16. Status of the AFP Project in ATLAS

    CERN Document Server

    AUTHOR|(INSPIRE)INSPIRE-00224260; The ATLAS collaboration

    2017-01-01

    Status of the AFP project in the ATLAS experiment is given. In 2016 one arm of the AFP detector was installed and first data have been taken. In parallel with integration of the AFP subdetector into the ATLAS TDAQ nad DCS, beam tests and preparations for the installation of the 2nd arm are performed.

  17. The EEE Project status and perspectives

    CERN Document Server

    Antolini, R; Baldini Ferroli, R; Bencivenni, G; Blanco, F; Bressan, E; Chiavassa, A; Cifarelli, L; Cindolo, F; Coccia, E; De Pasquale, S; Di Giovanni, A; D'Incecco, M; Fabbri, F L; Garbini, M; Gustavino, C; Hatzifotiadou, D; Imponente, G; La Rocca, P; Librizzi, F; Menghetti, H; Miozzi, S; Pappalardo,G S; Piragino, G; Riggi, F; Sartorelli, G; Sbarra, C; Selvi, M; Williams, C; Zichichi, A

    2007-01-01

    The Extreme Energy Events (EEE) project plans to build and use an array of cosmic ray telescopes for muon detection, distributed over the italian territory. The use of such telescopes, based on Multigap Resistive Plate Chambers (MRPC) will allow the study of cosmic ray showers and the correlation between multiple primaries producing distant showers. The project is also intended to involve high school teams in an advanced research work. The physics items which can be addressed by such array, and the present status and perspectives of the project are here discussed.

  18. Status Report of Projects Activities at CERN

    CERN Document Server

    Missiaen, Dominique; Dobers, Tobias; Fuchs, Jean-Frederic; Gayde, Jean-Christophe; Jones, Mark; Mainaud Durand, Helene

    2014-01-01

    Besides the Long Shut-Down 1 (LS1), some projects are still progressing at CERN. Among them, it has to be mentioned LINAC4, a future essential part of the LHC injector chain, AWAKE, a project to verify the approach of using protons to drive a strong wakefield in a plasma, ELENA, a small compact ring for cooling and decelerating antiproton and HIE-Isolde, not to forget the long term studies for CLIC and FCC. This paper describes the status of these projects from the survey and alignment point of view.

  19. The EEE Project: status and perspectives

    Science.gov (United States)

    Antolini, R.; Badalà, A.; Baldini Ferroli, R.; Bencivenni, G.; Blanco, F.; Bressan, E.; Chiavassa, A.; Cifarelli, L.; Cindolo, F.; Coccia, E.; de Pasquale, S.; di Giovanni, A.; D'Incecco, M.; Fabbri, F. L.; Garbini, M.; Gustavino, C.; Hatzifotiadou, D.; Imponente, G.; La Rocca, P.; Librizzi, F.; Menghetti, H.; Miozzi, S.; Pappalardo, G. S.; Piragino, G.; Riggi, F.; Sartorelli, G.; Sbarra, C.; Selvi, M.; Williams, C.; Zichichi, A.

    2007-03-01

    The Extreme Energy Events (EEE) project plans to build and use an array of cosmic ray telescopes for muon detection, distributed over the italian territory. The use of such telescopes, based on Multigap Resistive Plate Chambers (MRPC) will allow the study of cosmic ray showers and the correlation between multiple primaries producing distant showers. The project is also intended to involve high school teams in an advanced research work. The physics items which can be addressed by such array, and the present status and perspectives of the project are here discussed.

  20. Socio-Economic Status and Occupational Status Projections of Southern Youth, By Race and Sex.

    Science.gov (United States)

    Lever, Michael F.; Kuvlesky, William P.

    The purpose of this study was to examine selected occupational status projections and the relationship between these projections and socioeconomic status (SES). Occupational status projections referred to predictive statements about the future lifetime job of the respondents. The occupational status projections included in the analysis were: (1)…

  1. Probe Project Status and Accomplishments - Year Two

    Energy Technology Data Exchange (ETDEWEB)

    Burris, R.D.

    2002-04-11

    The Probe project has established a facility for storage- and network-related research, development and testing. With sites at the Oak Ridge National Laboratory (ORNL) and the National Energy Research Scientific Computing Center (NERSC), Probe is investigating local-area or wide-area distributed storage issues ranging from data mining to optimizing retrieval operations from tape devices. Probe has completed its second full year of operation. In this document we will describe the status of the project as of December 31, 2001. This year we will structure this document by category of work, rather than by project status. We will present sections describing Scientific Discovery through Advanced Computation (SciDAC) projects, network research and research on data mining and distributed cluster analysis. Another section will describe data-transfer application development and testing and other types of hardware- and software-related testing and development activities. We will then describe the work undertaken for presentation at the SC2001 conference. The final section will summarize this year's publications. Individual projects described in this document have used some Probe resource--equipment, software, staff or funding. By describing these projects we do not imply that the work should be entirely credited to Probe, although we do assert that Probe's existence and assistance provided benefit to the work. The Probe project is funded by the Mathematical, Information, and Computer Sciences (MICS) department of the Advanced Scientific Computing Research office, Office of Science, Department of Energy.

  2. Tribal Colleges Initiative project. Quarterly report, April 1--June 30, 1998

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-07-01

    The Tribal Colleges Initiative (TCI) grant is in the second year of funding from the US Department of Energy Environmental Management Program. The project period has been determined to be 7.5 months, April 1 to November 14, 1998 in order to align with the federal fiscal year. This quarterly report includes activities for the first three months (April 1--June 30, 1998) of the Year 2 funding period. The TCI Program office requested each Tribal College to write a quarterly report of activities at their respective institutions. These reported are attached. These institutions are Southwestern Indian Polytechnic Institute (SIPI), Crownpoint Institute of Technology (CIT) and the Dine` College (DC, formerly Navajo Community College).

  3. Geothermal direct-heat utilization assistance. Quarterly project progress report, July--September 1997

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-10-01

    This report summarizes geothermal technical assistance, R and D and technology transfer activities of the Geo-Heat Center at Oregon Institute of Technology for the fourth quarter of FY-97 (July--September 1997). It describes 213 contacts with parties during this period related to technical assistance with geothermal direct heat projects. Areas dealt with include requests for general information including maps, geothermal heat pumps, resource and well data, space heating and cooling, greenhouses, acquaculture, equipment, district heating, resorts and spas, and industrial applications. Research activities include the completion of a Comprehensive Greenhouse Developer Package. Work accomplished on the revision of the Geothermal Direct Use Engineering and Design Guidebook are discussed. Outreach activities include the publication of the Quarterly Bulletin (Vol. 18, No. 3), dissemination of information mainly through mailings of publications, geothermal library acquisition and use, participation in workshops, short courses, and technical meetings by the staff, and progress monitor reports on geothermal activities.

  4. Technical data base quarterly report, April--June 1992; Yucca Mountain Site Characterization Project

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1992-09-01

    The acquisition and development of technical data are activities that provide the information base from which the Yucca mountain Site will be characterized and may P-ventually be licensed as a high-level waste repository. The Project Technical Data Base (TDB) is the repository for the regional and site-specific technical data required in intermediate and license application analyses and models. The TDB Quarterly Report provides the mechanism for identifying technical data currently available from the Project TDB. Due to the variety of scientific information generated by YMP activities, the Project TDB consists of three components, each designed to store specific types of data. The Site and Engineering Properties Data Base (SEPDB) maintains technical data best stored in a tabular format. The Geographic Nodal Information Study and Evaluation System (GENISES), which is the Geographic Information System (GIS) component of the Project TDB, maintains spatial or map-like data. The Geologic and Engineering Materials Bibliography of Chemical Species (GEMBOCHS) data base maintains thermodynamic/geochemical data needed to support geochemical reaction models involving the waste package and repository geochemical environment. Each of these data bases are addressed independently within the TDB Quarterly Report.

  5. CPC air-blown integrated gasification combined cycle project. Quarterly report, October--December 1992

    Energy Technology Data Exchange (ETDEWEB)

    1993-01-01

    The overall project cost and schedule. The combustion turbine commercial operation date is scheduled for 7/1/95 with the combined cycle commercial operation date of 7/1/96. A two year demonstration period will commence after IGCC commercial operation. Details of costs on a total project and DOE Envelope basis along with detailed schedule components were covered. Major cost variances to date were discussed. The major variances this year relate to contracts which were anticipated to be finalized mid 1992 but which are not executed. These include GEESI, the ASU and key vessels. Some of these contracts are almost in place and others are scheduled for the first quarter 1993. Numerous project specifications, process flow diagrams, piping and instrument diagrams and other drawings have been reviewed and approved as part of the preliminary engineering process.

  6. Geothermal direct-heat utilization assistance: Quarterly project progress report, January--March 1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-05-01

    The report summarizes geothermal activities of the Geo-Heat Center at Oregon Institute of Technology for the second quarter of FY-95. It describes 92 contacts with parties during this period related to technical assistance with geothermal direct heat projects. Areas dealt with include geothermal heat pumps, space heating, greenhouses, aquaculture, resources and equipment. Research activities are summarized on geothermal energy cost evaluation, low temperature resource assessment and ground-source heat pump case studies and utility programs. Outreach activities include the publication of a geothermal direct heat Bulletin, dissemination of information, geothermal library, and progress monitor reports on geothermal resources and utilization.

  7. Geothermal direct-heat utilization assistance. Quarterly project progress report, July 1995--September 1995

    Energy Technology Data Exchange (ETDEWEB)

    Lienau, P.

    1995-12-01

    The report summarizes geothermal technical assistance, R&D and technology transfer activities of the Geo-Heat Center at Oregon Institute of Technology for the fourth quarter of FY-95. It describes 80 contacts with parties during this period related to technical assistance with geothermal direct heat projects. Areas dealt with include geothermal heat pumps, space heating, greenhouses, aquaculture, equipment and resources. Research activities are summarized on low-temperature resource assessment, geothermal energy cost evaluation and marketing strategy for geothermal district heating. Outreach activities include the publication of a geothermal direct use Bulletin, dissemination of information, geothermal library, technical papers and seminars, and progress monitor reports on geothermal resources and utilization.

  8. Status of ITER Cryodistribution and Cryoline project

    Science.gov (United States)

    Sarkar, B.; Vaghela, H.; Shah, N.; Bhattacharya, R.; Choukekar, K.; Patel, P.; Kapoor, H.; Srinivasa, M.; Chang, H. S.; Badgujar, S.; Monneret, E.

    2017-02-01

    The system of ITER Cryodistribution (CD) and Cryolines (CLs) is an integral interface between the Cryoplant systems and the superconducting (SC) magnets as well as Cryopumps (CPs). The project has progressed from the conceptual stage to the industrial stage. The subsystems are at various stages of design as defined by the project, namely, preliminary design, final design and formal reviews. Significant progresses have been made in the prototypes studies and design validations, such as the CL and cold circulators. While one of the prototype CL is already tested, the other one is in manufacturing phase. Performance test of two cold circulators have been completed. Design requirements are unique due the complexity arising from load specifications, layout constraints, regulatory compliance, operating conditions as well as several hundred interfaces. The present status of the project in terms of technical achievements, implications of the changes and the technical management as well as the risk assessment and its mitigation including path forward towards realization is described.

  9. BX in-situ oil-shale project. Quarterly technical progress report, June 1, 1981-August 31, 1981

    Energy Technology Data Exchange (ETDEWEB)

    Dougan, P.M.

    1981-09-20

    June 1, 1981-August 31, 1981 was the third consecutive quarter of superheated steam injection at the BX In Situ Oil Shale Project. Injection was continuous except for the period of July 14th to August 1st when the injection was suspended during the drilling of core hole BX-37. During the quarter, 99,760 barrels of water as superheated steam were injected into Project injection wells at an average well head temperature of 752/sup 0/F and an average wellhead pressure of 1312 PSIG. During the same period, 135,469 barrels of fluid were produced from the Project production wells for a produced to injected fluid ratio of 1.36 to 1.0. Net oil production during the quarter was 38 barrels.

  10. CAREM Project : Present status and development activities

    Energy Technology Data Exchange (ETDEWEB)

    Boado, H. J.; Ordonez, Juan P. [INVAP, Bariloche (Argentina)

    1996-04-15

    The CAREM Project is a low power NPP of 2.5 MWe, with an integrated self pressurized primary system. The cooling of the primary system is of the natural circulation type, featuring several passive safety systems. The project is owned by Argentina's CNEA (Comision Nacional de Energia Atomica) and its associated company, INVAP, which in turn is its main contractor. In this work the present status of the CAREM Project is presented. The possible evolution of the CAREM project is mentioned in relation with a new containment design. Brief descriptions of the Experimental Facilities, listed below, already in operation or under construction are included: {center_dot} CAPCN High Pressure Loop. A natural convection loop to verify dynamic response and critical heat flux. {center_dot} RA-8 Critical Facility, designed and constructed for the CAREM Project (that can be used as a general use facility). {center_dot} RPV Internals The whole assembly of absorb em rods, connecting rods and the rod guides is being constructed on a 1:1 scale. The aims of this experimental facility are vibration analysis and manufacturing parameter definitions. {center_dot} Control Drive Mechanisms. A series of verifications and tests are being carried out on these within RPV hydraulically driven mechanisms. {center_dot} Other development activities are mentioned in relation with the Thermal hydraulics, Steam Generators and Control.

  11. Wolsong 2, 3 and 4 quarterly progress review report on NSSS design and engineering

    Energy Technology Data Exchange (ETDEWEB)

    Jung, Sung Hoon; Kim, Sun Kee; Park, Tae Keu [Korea Atomic Energy Research Institute, Taejon (Korea, Republic of)

    1994-10-01

    This is the Quarterly Progress Review Report for Wolsong NPP 2, 3 and 4 NSSS Design and Engineering which evaluates the performance of the project and describes the project highlight, manpower loading status, design and engineering and project related meetings by quarterly basis. 26 figs., 13 tabs. (Author).

  12. The INCA project: present status and outlook

    Energy Technology Data Exchange (ETDEWEB)

    Aleksandrov, K.V.; Ammosov, V.V.; Chechin, V.A.; Chubenko, A.P.; Erlykin, A.D.; Ladygin, E.A.; Merzon, G.I.; Mukhamedshin, R.A.; Murashov, V.N.; Pavlyuchenko, V.P.; Ryabov, V.A.; Ryazhskaya, O.G.; Saito, T.; Sobolevskii, N.M.; Shchepetov, A.L.; Starkov, N.I.; Trostin, I.S.; Tsarev, V.A.; Wolfendale, A.; Zatsepin, G.T.; Zhdanov, G.B.; Zhukov, A.P

    2002-12-01

    Scientific objectives, foundations, status, and outlook of the INCA Project are presented. Fundamentally new technique based on the ionization-neutron calorimeter (INCA) and designed to study local nearby sources of high-energy cosmic rays by direct measuring the spectrum and composition of the nuclear component in the 'knee' region and the spectrum of primary electrons in the energy range 0.1-10 TeV with the proton-background suppression factor up to 10{sup 7} is discussed. Experimental data on exposition of the INCA prototypes to electron, pion, and proton beams at various energies and corresponding simulation results are presented. Prospects are considered.

  13. The Super-B project accelerator status

    CERN Document Server

    Biagini, M.E.; Boni, R; Boscolo, M; Demma, T; Drago, A; Esposito, M; Guiducci, S; Marcellini, F; Mazzitelli, G; Preger, M; Raimondi, P; Sanelli, C; Serio, M; Stecchi, A; Stella, A; Tomassini, S; Zobov, M; Bertsche, K; Brachmann, A; Cai, Y; Chao, A; DeLira, A; Donald, M; Fisher, A; Kharakh, D; Krasnykh, A; Li, N; MacFarlane, D; Nosochkov, Y; Novokhatski, A; Pivi, M.; Seeman, J; Sullivan, M; Wienands, U; Weisend, J; Wittmer, W; Koop, I; Levichev, E; Nikitin, S; Piminov, P; Sinyatkin, S; Shatilov, D; Bolzon, B; Brunetti, L; Jeremie, A; Baylac, M; DeConto, J M; Gomez, Y; Meot, F; Monseu, N; Tourres, D; Bonis, J.; Chehab, R; Le Meur, G; Mercier, B; Poirier, F; Prevost, C; Rimbault, C; Touze, F; Variola, A; Chance, A; Napoly, O; Bosi, F; Liuzzo, S; Paoloni, E; Bettoni, S

    2010-01-01

    The SuperB project is an international effort aiming at building in Italy a very high luminosity e+e- (1036 cm-2 sec-1) asymmetric collider at the Y(4S) energy in the cm. The accelerator design has been extensively studied and changed during the past year. The present design, based on the new collision scheme, with large Piwinski angle and the use of “crab waist” sextupoles already successfully tested at the DANE -Factory at LNF Frascati, provides larger flexibility, better dynamic aperture and spin manipulation sections in the Low Energy Ring (LER) for longitudinal polarization of the electron beam at the Interaction Point (IP). The Interaction Region (IR) has been further optimized in terms of apertures and reduced backgrounds in the detector. The injector complex design has been also updated. A summary of the project status will be presented in this paper

  14. Robotic Lunar Lander Development Project Status

    Science.gov (United States)

    Hammond, Monica; Bassler, Julie; Morse, Brian

    2010-01-01

    This slide presentation reviews the status of the development of a robotic lunar lander. The goal of the project is to perform engineering tests and risk reduction activities to support the development of a small lunar lander for lunar surface science. This includes: (1) risk reduction for the flight of the robotic lander, (i.e., testing and analyzing various phase of the project); (2) the incremental development for the design of the robotic lander, which is to demonstrate autonomous, controlled descent and landing on airless bodies, and design of thruster configuration for 1/6th of the gravity of earth; (3) cold gas test article in flight demonstration testing; (4) warm gas testing of the robotic lander design; (5) develop and test landing algorithms; (6) validate the algorithms through analysis and test; and (7) tests of the flight propulsion system.

  15. Status of the SPARC-X Project

    Energy Technology Data Exchange (ETDEWEB)

    Bougeard, M.; Breger, P.; Carre, B.; Garzella, D.; Labat, M.; Lambert, G.; Merdji, H.; Monchicourt, P.; Salieres, P.; Tcherbakoff, O.; /Saclay; Ciocci, F.; Dattoli, G.; Dipace, A.; Doria, Alessandra; Flora, F.; Gallerano, G.P.; Giannessi, L.; Giovenale, E.; Messina, G.; Ottaviani, P.L.; Pagnutti, S.; /ENEA, Frascati /INFN, Lecce /INFN, Milan /INFN, Rome /INFN, Rome /Frascati /SLAC /SOLEIL, Saint-Aubin /UCLA /Rome U.

    2007-11-02

    SPARC-X is a two branch project consisting in the SPARC test facility dedicated to the development and test of critical subsystems such as high brightness photoinjector and a modular expandable undulator for SASE-FEL experiments at 500 nm with seeding, and the SPARX facility aiming at generation of high brilliance coherent radiation in the 1.5-13 nm range, based on the achieved expertise. The projects are supported by MIUR (Research Department of Italian Government) and Regione Lazio. SPARC has completed the commissioning phase of the photoinjector in November 2006. The achieved experimental results are here summarized together with the status of the second phase commissioning plans. The SPARX project is based on the generation of ultra high peak brightness electron beams at the energy of 1 and 2 GeV generating radiation in the 1.5-13 nm range. The construction is at the moment planned in two steps starting with a 1 GeV Linac. The project layout including both RF-compression and magnetic chicane techniques has been studied.

  16. Federal assistance program. Quarterly project progress report, January 1998--March 1998

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-04-01

    This report summarizes geothermal technical assistance, R&D and technology transfer activities of the Geo-Heat Center at Oregon Institute of Technology for the second quarter of FY-98-98 (January-March, 1998). It describes 268 contacts with parties during this period related to technical assistance with geothermal direct heat projects. Areas dealt with include requests for general information including maps and material for high school debates, and material on geothermal heat pumps, resource and well data, spacing heating and cooling, greenhouses, aquaculture, equipment, district heating, resorts and spas, industrial applications, electric power and snow melting. Research activities include work on model construction specifications for line shaft submersible pumps and plate heat exchangers and a comprehensive aquaculture developer package. The revised Geothermal Direct Use Engineering and Design Guidebooks was completed, published and is available for distribution. Outreach activities include the publication of the Quarterly Bulletin (Vol. 19, No. 1) which was devoted entirely to geothermal equipment, dissemination of information mainly through mailings of publications, tours of local geothermal uses, geothermal library acquisitions and use, participation in workshops, short courses and technical meetings by the staff, and progress monitor reports on geothermal activities.

  17. Geothermal direct-heat utilization assistance. Quarterly project progress report, October--December 1997

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-01-01

    This report summarizes geothermal technical assistance, R and D and technology transfer activities of the Geo-Heat Center at Oregon Institute of Technology for the first quarter of FY-98 (October--December 1997). It describes 216 contacts with parties during this period related to technical assistance with geothermal direct heat projects. Areas dealt with include requests for general information including maps and material for high school debates, and material on geothermal heat pumps, resource and well data, space heating and cooling, greenhouses, aquaculture, equipment, district heating, resorts and spas, industrial applications, electric power and snow melting. Research activities include work on model construction specifications of lineshaft submersible pumps and plate heat exchangers, a comprehensive aquaculture developer package and revisions to the Geothermal Direct Use Engineering and Design Guidebook. Outreach activities include the publication of the Quarterly Bulletin (Vol. 18, No. 4) which was devoted entirely to geothermal activities in South Dakota, dissemination of information mainly through mailings of publications, tours of local geothermal uses, geothermal library acquisition and use, participation in workshops, short courses and technical meetings by the staff, and progress monitor reports on geothermal activities.

  18. Grade Retention in Primary Education Is Associated with Quarter of Birth and Socioeconomic Status

    Science.gov (United States)

    2016-01-01

    Grade retention is still common practice in some countries though longstanding experience tells us that it is a highly criticised practice for its unclear benefits, its important costs for the educational systems and its relation with school dropout. Therefore, the aim of the present study is to analyse which variables increase the probability of being retained in primary education differentiating between being retained in second or in fourth grade, and paying special attention to the role of the socioeconomic status of the families. By knowing which analysed variables are related to grade retention, and how, we may offer some suggestions to reduce it. We use a national dataset with more observations for Spain than any other international ones, called ‘Evaluación General de Diagnóstico’, conducted in Spain in 2009 with the participation of 28708 students of fourth grade of primary education from 874 schools, considered to be representative for every Spanish autonomous region. This assessment focused on four competences and includes information about the learning context collected through questionnaires for students, families, school management and teachers. Estimating different multilevel random-intercept logistic regressions we obtain the following three main findings: 1) the existence of a ‘quarter of birth’ effect, that nearly doubles the probability of grade retention in second grade of primary –compared to the probability of grade retention in fourth grade–, for the youngest students of their same age cohort (OR = 1.93 vs. OR = 1.53, both p0.05)–. PMID:27851779

  19. Western Gas Sands Project status report

    Energy Technology Data Exchange (ETDEWEB)

    Atkinson, C.H.

    1978-09-30

    The status of government sponsored projects undertaken to increase gas production from low-permeability gas sands of the western United States during August 1978 is summarized. Background information is given in the September 1977 Status Report, NVO/0655-100. One of the largest massive Hydraulic Fracture (MHF) treatment to date was performed on Gas Producing Enterprises Well No. CIGE 2-29. C.H. Atkinson, Western Gas Sands Project (WGSP) Manager and D.C. Bleakly, CER Corporation were observers. Oriented coring operations on the Mitchell Energy well, Muse-Duke No. 1 were observed by Atkinson and Bleakly near Mexia, Texas. The Fourth Annual Department of Energy Symposium on Enhanced Oil and Gas Recovery and Improved Drilling Methods was held on August 29-31, 1978 in Tulsa, Oklahoma. The USGS continued geological and geophysical studies in the four primary study areas. Low-level oblique photography of Tertiary and Cretaceous rocks exposed in the Rock Springs Uplift area was completed, and core from the J.C. Paine well in Montana was sampled for petrograhic analysis. Bartlesville Energy Technology Center continued work on the improved pressure coring system and anticipates completion of the project by September 30, 1978. Preliminary work began on the Parametric Analysis of MHF Test Data, an Engineering Study of Western Gas Sands, by Intercomp. The National Laboratories, funded by DOE are continuing their work in the area of research and development. The emphasis is on instrumentation systems, rock mechanics, mathematical modeling, and data analysis. The Mitchell Energy well, Muse Duke No. 1, has reached total depth and was logged on August 31, 1978. The DOE well test facility was moved from the RB-MHF 3 well in Colorado to Vernal, Utah for trailer modifications and checkout.

  20. MHD Integrated Topping Cycle Project. Seventeenth quarterly technical progress report, August 1, 1991--October 31, 1991

    Energy Technology Data Exchange (ETDEWEB)

    1992-07-01

    This seventeenth quarterly technical progress report of the MHD Integrated Topping Cycle Project presents the accomplishments during the period August 1, 1991 to October 31, 1991. Manufacturing of the prototypical combustor pressure shell has been completed including leak, proof, and assembly fit checking. Manufacturing of forty-five cooling panels was also completed including leak, proof, and flow testing. All precombustor internal components (combustion can baffle and swirl box) were received and checked, and integration of the components was initiated. A decision was made regarding the primary and backup designs for the 1A4 channel. The assembly of the channel related prototypical hardware continued. The cathode wall electrical wiring is now complete. The mechanical design of the diffuser has been completed.

  1. Low-Cost Solar Array (LSA) Project. Project quarterly report No. 9, April--June 1978

    Energy Technology Data Exchange (ETDEWEB)

    1978-01-01

    Progress made by the Low-Cost Solar Array Project during the period April through June 1978 is described. It includes reports on silicon material processing, large-area silicon sheet development, encapsulation materials testing and development, project engineering and operations activities, and manufacturing techniques, plus the steps taken to integrate these efforts.

  2. Field Verification Project for Small Wind Turbines, Quarterly Report: April - June 2001; 2nd Quarter, Issue No.5

    Energy Technology Data Exchange (ETDEWEB)

    2002-04-01

    This newsletter provides a brief overview of the Field Verification Project for Small Wind Turbines conducted out of the NWTC and a description of current activities. The newsletter also contains case studies of current projects.

  3. Field Verification Project for Small Wind Turbines Quarterly Report; July-September 2001, 3rd Quarter, Issue#6

    Energy Technology Data Exchange (ETDEWEB)

    2003-04-01

    This newsletter provides a brief overview of the Field Verification Project for Small Wind Turbines conducted at the NWTC and a description of current activities. The newsletter also contains case studies of current projects.

  4. MHD Integrated Topping Cycle Project. Sixteenth quarterly technical progress report, May 1991--July 1991

    Energy Technology Data Exchange (ETDEWEB)

    1992-03-01

    The Magnetohydrodynamics (MHD) Integrated Topping Cycle (ITC) Project represents the culmination of the proof-of-concept (POC) development stage in the US Department of Energy (DOE) program to advance MHD technology to early commercial development stage utility power applications. The project is a joint effort, combining the skills of three topping cycle component developers: TRW, Avco/TDS, and Westinghouse. TRW, the prime contractor and system integrator, is responsible for the 50 thermal megawatt (50 MW{sub t}) slagging coal combustion subsystem. Avco/TDS is responsible for the MHD channel subsystem (nozzle, channel, diffuser, and power conditioning circuits), and Westinghouse is responsible for the current consolidation subsystem. The ITC Project will advance the state-of-the-art in MHD power systems with the design, construction, and integrated testing of 50 MW{sub t} power train components which are prototypical of the equipment that will be used in an early commercial scale MHD utility retrofit. Long duration testing of the integrated power train at the Component Development and Integration Facility (CDIF) in Butte, Montana will be performed, so that by the early 1990`s, an engineering data base on the reliability, availability, maintainability and performance of the system will be available to allow scaleup of the prototypical designs to the next development level. This Sixteenth Quarterly Technical Progress Report covers the period May 1, 1991 to July 31, 1991.

  5. MHD Integrated Topping Cycle Project. Sixteenth quarterly technical progress report, May 1991--July 1991

    Energy Technology Data Exchange (ETDEWEB)

    1992-03-01

    The Magnetohydrodynamics (MHD) Integrated Topping Cycle (ITC) Project represents the culmination of the proof-of-concept (POC) development stage in the US Department of Energy (DOE) program to advance MHD technology to early commercial development stage utility power applications. The project is a joint effort, combining the skills of three topping cycle component developers: TRW, Avco/TDS, and Westinghouse. TRW, the prime contractor and system integrator, is responsible for the 50 thermal megawatt (50 MW{sub t}) slagging coal combustion subsystem. Avco/TDS is responsible for the MHD channel subsystem (nozzle, channel, diffuser, and power conditioning circuits), and Westinghouse is responsible for the current consolidation subsystem. The ITC Project will advance the state-of-the-art in MHD power systems with the design, construction, and integrated testing of 50 MW{sub t} power train components which are prototypical of the equipment that will be used in an early commercial scale MHD utility retrofit. Long duration testing of the integrated power train at the Component Development and Integration Facility (CDIF) in Butte, Montana will be performed, so that by the early 1990`s, an engineering data base on the reliability, availability, maintainability and performance of the system will be available to allow scaleup of the prototypical designs to the next development level. This Sixteenth Quarterly Technical Progress Report covers the period May 1, 1991 to July 31, 1991.

  6. The DESIREE project - a status report

    Energy Technology Data Exchange (ETDEWEB)

    Schmidt, H T; Thomas, R D; Misra, D; Larsson, M; Rosen, S; Reinhed, P; Johansson, H; Haag, N; Seitz, F; Cederquist, H [Department of Physics, Stockholm University, S-10691, Stockholm (Sweden); Danared, H; Loefgren, P; Simonsson, A; Rensfelt, K G; Kaellberg, A; Liljeby, L, E-mail: schmidt@physto.s, E-mail: cederquist@physto.s [Manne Siegbahn Laboratory, Stockholm University, S-11418, Stockholm (Sweden)

    2009-11-01

    We are in the process of constructing the double electrostatic storage ring DESIREE at Stockholm University and AlbaNova University Centre. DESIREE with its two 8.8 meters circumference ion storage rings with a common section for tuning the collision energy down to 10 meV will be operated at cryogenic temperatures. The two separate ion source platforms, with maximum floating potentials of 100 keV and 25 keV, respectively, will be equipped with different types of ion sources, e.g. electrospray sources, and equipment for cryogenic cooling of ions before injection in DESIREE. In this poster presentation we will give a status report of the project.

  7. Status of the TOP Linac project

    Energy Technology Data Exchange (ETDEWEB)

    Cianfarani, Cesidio [ENEA, Via E. Fermi 45, Frascati (Rome) (Italy); Cisbani, Evaristo [ISS, Viale Regina Elena 199, Rome (Italy); Orlandi, Gianluca [ENEA, Via E. Fermi 45, Frascati (Rome) (Italy); Frullani, Salvatore [ISS, Viale Regina Elena 199, Rome (Italy); Picardi, Luigi [ENEA, Via E. Fermi 45, Frascatim(Rome) (Italy)]. E-mail: picardi@frascati.enea.it; Concetta Ronsivalle [ENEA, Via E. Fermi 45, Frascati (Rome) (Italy)

    2006-06-23

    The TOP Linac (Oncological Therapy with Protons), under development by ENEA and ISS is a sequence of three pulsed (5 {mu}s 300 Hz) linear accelerators: a 7 MeV, 425 MHz RFQ+DTL (AccSys Model PL-7), a 7-65 MeV, 2998 MHz Side Coupled Drift Tube Linac (SCDTL) and a 65-200 MeV, variable energy 2998 MHz Side Coupled Linac (SCL). The status of the project will be presented. The 7 MeV injector is installed at ENEA-Frascati laboratories. The first SCDTL module structure, composed by nine DTL tanks coupled by eight side cavities, has been built and tested on RF bench, so that it is ready for proton acceleration. The results of the measurements done will be also shown.

  8. Salt repository project closeout status report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1988-06-01

    This report provides an overview of the scope and status of the US Department of Energy (DOE`s) Salt Repository Project (SRP) at the time when the project was terminated by the Nuclear Waste Policy Amendments Act of 1987. The report reviews the 10-year program of siting a geologic repository for high-level nuclear waste in rock salt formations. Its purpose is to aid persons interested in the information developed during the course of this effort. Each area is briefly described and the major items of information are noted. This report, the three salt Environmental Assessments, and the Site Characterization Plan are the suggested starting points for any search of the literature and information developed by the program participants. Prior to termination, DOE was preparing to characterize three candidate sites for the first mined geologic repository for the permanent disposal of high-level nuclear waste. The sites were in Nevada, a site in volcanic tuff; Texas, a site in bedded salt (halite); and Washington, a site in basalt. These sites, identified by the screening process described in Chapter 3, were selected from the nine potentially acceptable sites shown on Figure I-1. These sites were identified in accordance with provisions of the Nuclear Waste Policy Act of 1982. 196 refs., 21 figs., 11 tabs.

  9. SIRGAS Project: present status; Projeto SIRGAS: estagio atual

    Energy Technology Data Exchange (ETDEWEB)

    Fortes, Luiz Paulo Souto [Fundacao Instituto Brasileiro de Geografia e Estatistica (IBGE), Rio de Janeiro, RJ (Brazil). Dept. de Geodesia

    1995-12-31

    The status of the South American Geocentric reference System (SIRGAS) Project is presented, including the project goals, objectives and tasks already carried out by the Working Groups. (author). 2 refs., 1 fig., 1 tab

  10. INCA-CE project: status and results

    Science.gov (United States)

    Strauss, Franziska; Meirold-Mautner, Ingo; Bica, Benedikt; Kann, Alexander; Wang, Yong

    2013-04-01

    Every year, Central Europe (CE) is affected by weather extremes challenging civil protection authorities, hydrologists and road maintenance services to timely warnings. Within the INCA-CE project (Integrated Nowcasting through Comprehensive Analysis in Central Europe; http://www.inca-ce.eu) which is supported by the European Regional Development Fund a deepened transnational cooperation between meteorological/hydrological services and three application areas is established. This guarantees for both enhancements of meteorological products in the sense of end-user friendliness, and standardized information exchange across borders. At present, INCA-CE is the only project throughout the world which connects cooperation to such an extent with respect to its transnational and multidisciplinary framework (in the meanwhile it has been chosen as World Weather Research Programme/Forecast Demonstration Project by the World Meteorological Organization). Key partners from eight countries (from national meteorological/hydrological services and the three different application areas) accept the challenge to work on standardization and harmonization tools. Therefore, the INCA nowcasting system - developed at the Austrian weather service (ZAMG) in the 1990ies - has been implemented at all CE meteorological/hydrological services and is advanced and refined to the specific user needs to (i) provide high quality nowcasting products which are standardized and harmonized across borders, (ii) improve information chains from models to warnings and protection measures in case of disaster, and (iii) make the public and stakeholders more familiar with meteorological products. However, the potential to achieve these listed improvements is only possible through the intense transnational and multidisciplinary cooperation, because for one institution and one country alone it would be impossible to cope with all the necessary tasks. In this presentation the status and results of the INCA

  11. The Super-B Project Accelerator Status

    Energy Technology Data Exchange (ETDEWEB)

    Biagini, M.E.; Alesini, D.; Boni, R.; Boscolo, M.; Demma, T.; Drago, A.; Esposito, M.; Guiducci, S.; Marcellini, F.; Mazzitelli, G.; Preger, M.; Raimondi, P.; Sanelli, C.; Serio, M.; Stecchi, A.; Stella, A.; Tomassini, S.; Zobov, M.; /Frascati; Bertsche, K.; Brachmann, A.; Cai, Y.; /SLAC /Novosibirsk, IYF /Annecy, LAPP /LPSC, Grenoble /Orsay, LAL /Saclay /Pisa U. /CERN

    2011-08-17

    The SuperB project is an international effort aiming at building in Italy a very high luminosity e{sup +}e{sup -} (10{sup 36} cm{sup -2} sec{sup -1}) asymmetric collider at the Y(4S) energy in the CM. The accelerator design has been extensively studied and changed during the past year. The present design, based on the new collision scheme, with large Piwinski angle and the use of 'crab waist' sextupoles already successfully tested at the DA{Phi}NE {Phi}-Factory at LNF Frascati, provides larger flexibility, better dynamic aperture and spin manipulation sections in the Low Energy Ring (LER) for longitudinal polarization of the electron beam at the Interaction Point (IP). The Interaction Region (IR) has been further optimized in terms of apertures and reduced backgrounds in the detector. The injector complex design has been also updated. A summary of the project status will be presented in this paper. The SuperB collider can reach a peak luminosity of 10{sup 36} cm{sup -2} sec{sup -1} with beam currents and bunch lengths similar to those of the past and present e{sup +}e{sup -} Factories, through the use of smaller emittances and new scheme of crossing angle collision. The beams are stored in two rings at 6.7 GeV (HER) and 4.2 GeV (LER). Unique features of the project are the polarization of the electron beam in the LER and the possibility to decrease the energies for running at the {tau}/charm threshold. The option to reuse the PEP-II B-Factory (SLAC) hardware will allow reducing costs. The SuperB facility will require a big complex of civil infrastructure. The main construction, which will house the final part of the LINAC, the injection lines, the damping rings, and the storage rings, will be mainly underground. Two sites have been considered: the campus of Tor Vergata University near Frascati, and the INFN Frascati Laboratory. No decision has been made yet. A footprint of the possible SuperB layout on the LNF area is shown in Fig. 1.

  12. GBRN/DOE Project: Dynamic enhanced recovery technologies. Quarterly technical report, January 1994--March 1994

    Energy Technology Data Exchange (ETDEWEB)

    Anderson, R.N.

    1994-04-15

    Global Basins Research Network will perform a field demonstration of their ``Dynamic Enhanced Recovery Technology`` to test the concept that the growth faults in EI-330 field are conduits through which producing reservoirs are charged and that enhanced production can be developed by producing directly from the fault zone. The site, operated by Penzoil, is located in 250 feet of water the productive depth intervals include 4000 to 9000 feet. Previous work, which incorporated pressure, temperature, fluid flow, heat flow, seismic, production, and well log data, indicated active fluid flow along fault zones. The field demonstration will be accomplished by drilling and production test of growth fault systems associated with the EI-330 field. The project utilizes advanced 3-D seismic analysis, geochemical studies, structural and stratigraphic reservoir characterization, reservoir simulation, and compact visualization systems. The quarterly progress reports contains accomplishments to date for the following tasks: Management start-up; database management; field and demonstration equipment; reservoir characterization, modeling; geochemistry; and data integration.

  13. MHD Integrated Topping Cycle Project. Fourteenth quarterly technical progress report, November 1, 1990-- January 31, 1991

    Energy Technology Data Exchange (ETDEWEB)

    1992-02-01

    This fourteenth quarterly technical progress report of the MHD Integrated Topping Cycle Project presents the accomplishments during the period November 1, 1990 to January 31, 1991. Testing of the High Pressure Cooling Subsystem electrical isolator was completed. The PEEK material successfully passed the high temperature, high pressure duration tests (50 hours). The Combustion Subsystem drawings were CADAM released. The procurement process is in progress. An equipment specification and RFP were prepared for the new Low Pressure Cooling System (LPCS) and released for quotation. Work has been conducted on confirmation tests leading to final gas-side designs and studies to assist in channel fabrication.The final cathode gas-side design and the proposed gas-side designs of the anode and sidewall are presented. Anode confirmation tests and related analyses of anode wear mechanisms used in the selection of the proposed anode design are presented. Sidewall confirmation tests, which were used to select the proposed gas-side design, were conducted. The design for the full scale CDIF system was completed. A test program was initiated to investigate the practicality of using Avco current controls for current consolidation in the power takeoff (PTO) regions and to determine the cause of past current consolidation failures. Another important activity was the installation of 1A4-style coupons in the 1A1 channel. A description of the coupons and their location with 1A1 channel is presented herein.

  14. Project Radiation protection East. Status Report, July 1997

    Energy Technology Data Exchange (ETDEWEB)

    Snihs, J.O.; Sundewall, H.; Grapengiesser, S. [STEGRA Consultants (Sweden); Bennerstedt, T. [TeknoTelje (Sweden)

    1997-12-01

    Project Radiation Protection East is a Swedish program for radiation protection work in Central and Eastern Europe. The projects are assessed, planned and performed in close cooperation with partner organizations in the East. Since 1994 radiation protection cooperation concerning the former Soviet Navy training reactors in Paldiski, Estonia, is included in the project. This report presents a summary over some 140 projects, their status, allocated funds and their distribution over countries and project areas. 12 tabs.

  15. Status of the Cyclotron Institute Upgrade Project

    Science.gov (United States)

    Melconian, Dan

    2016-09-01

    The Texas A&M University Re-accelerated EXotics (T-REX) project, an upgrade to the Cyclotron Institute, will provide high-quality re-accelerated secondary beams of a unique energy range and the ability to provide primary beams to two experiments concurrently. The upgrade is nearing completion of its three major tasks: re-commissioning of the existing K150 cyclotron; construction of light- and heavy-ion guide transport systems; and charge-boosting the K150 RIB for re-acceleration using the K500 cyclotron. The light-ion guide transport system will utilize the high intensity (>= 10 μ A) proton beam from the K150 to produce rare ions via fusion-evapouration reactions or proton-induced fission fragments. These ions will be transported to an ECR charge breeder prior to injection in the K500. The heavy-ion guide will use deep inelastic, transfer and fragmentation reactions using the up to 25 MeV/u primary beams from the K150. The products will be separated by a superconducting solenoid and collected in a large gas-catcher, after which a multi-RFQ system will transport the RIB to any of: the charge-breeder and K500; the TAMU Penning Trap beamline; or an MR-TOF for beam analysis. The status of the T-REX upgrade and an overview of its capabilities will be presented Supported by DOE Grant Number DE-FG03-93ER40773 and the Robert A. Welch Foundation Grant Number H-A-0098.

  16. 20 CFR 404.146 - When a calendar quarter cannot be a quarter of coverage.

    Science.gov (United States)

    2010-04-01

    ... 20 Employees' Benefits 2 2010-04-01 2010-04-01 false When a calendar quarter cannot be a quarter...-AGE, SURVIVORS AND DISABILITY INSURANCE (1950- ) Insured Status and Quarters of Coverage Quarters of Coverage § 404.146 When a calendar quarter cannot be a quarter of coverage. This section applies when...

  17. Western gas sands project. Status report, July-August-September 1981

    Energy Technology Data Exchange (ETDEWEB)

    None

    1981-03-01

    The progress during July, August and September 1981 on increasing gas production from low permeability gas sands of the Western United States, is summarized in this edition of the WGSP Quarterly Status Report. During the quarter, CK GeoEnergy completed the field work in the Rifle Gap area near Rifle, Colorado, as well as the Draft Phase VI report covering the prognosis about reservoir geometry in the Multi-Well site area. The improved pressure coring system project, officially terminated Sept. 30. Accomplishments included increased capabilities for the pressure core barrel, improvements in the low invasion fluid plus various laboratory core intrusion studies and improved designs for PDC drill bits. At Lawrence Livermore National Laboratory, the P/sup 2/L/sup 2/ system described last quarter was evaluated further and the decision has been made to abandon further investigation. The Los Alamos National Laboratory Ceramics Materials Group is preparing to fabricate a ceramic sample with cylindrical pores of specified diameters. The NMR data on this type sample will contribute to a better understanding of the parameters affecting NMR relaxation rates in porous media. During the quarter, modifications were made in the operating and application software of the DOE Well Test Facility, which will support additions to the PDP-11/10 computer system. The Multi-Well Experiment well was spudded on Sept. 13 and by Sept. 30, total depth was 3358 ft. Coring operations are expected to begin at a depth of 4150 ft. At the Nevada Test Site, Sandia National Laboratories completed four additional coreholes for the Fluid Mechanics/ Proppant Transport Experiments.

  18. Western gas sands project. Status report, July-August-September 1981

    Energy Technology Data Exchange (ETDEWEB)

    None

    1981-03-01

    The progress during July, August and September 1981 on increasing gas production from low permeability gas sands of the Western United States, is summarized in this edition of the WGSP Quarterly Status Report. During the quarter, CK GeoEnergy completed the field work in the Rifle Gap area near Rifle, Colorado, as well as the Draft Phase VI report covering the prognosis about reservoir geometry in the Multi-Well site area. The improved pressure coring system project, officially terminated Sept. 30. Accomplishments included increased capabilities for the pressure core barrel, improvements in the low invasion fluid plus various laboratory core intrusion studies and improved designs for PDC drill bits. At Lawrence Livermore National Laboratory, the P/sup 2/L/sup 2/ system described last quarter was evaluated further and the decision has been made to abandon further investigation. The Los Alamos National Laboratory Ceramics Materials Group is preparing to fabricate a ceramic sample with cylindrical pores of specified diameters. The NMR data on this type sample will contribute to a better understanding of the parameters affecting NMR relaxation rates in porous media. During the quarter, modifications were made in the operating and application software of the DOE Well Test Facility, which will support additions to the PDP-11/10 computer system. The Multi-Well Experiment well was spudded on Sept. 13 and by Sept. 30, total depth was 3358 ft. Coring operations are expected to begin at a depth of 4150 ft. At the Nevada Test Site, Sandia National Laboratories completed four additional coreholes for the Fluid Mechanics/ Proppant Transport Experiments.

  19. Wind/photovoltaic power indicators. Fourth quarter 2011; Tableau de bord eolien-photovoltaique - Quatrieme trimestre 2011

    Energy Technology Data Exchange (ETDEWEB)

    Thienard, Helene

    2012-02-15

    This document makes a quarterly status of the power generation from wind and photovoltaic power plants connected to the French grid (continental France, Corsica and overseas territories): total connected load, quarterly connected load during the last years, power generated since the beginning of the year, progress trend of wind and photovoltaic power in France, projects in progress, regional status. (J.S.)

  20. Wind/photovoltaic power indicators. Third quarter 2011; Tableau de bord eolien-photovoltaique - Troisieme trimestre 2011

    Energy Technology Data Exchange (ETDEWEB)

    Thienard, Helene

    2011-11-15

    This document makes a quarterly status of the power generation from wind and photovoltaic power plants connected to the French grid (continental France, Corsica and overseas territories): total connected load, quarterly connected load during the last years, power generated since the beginning of the year, progress trend of wind and photovoltaic power in France, projects in progress, regional status. (J.S.)

  1. Basalt Waste Isolation Project. Quarterly report, January 1-March 31, 1980

    Energy Technology Data Exchange (ETDEWEB)

    Deju, R.A.

    1980-04-01

    This report addresses the technical progress for the Basalt Waste Isolation Project for the second quarter of fiscal year 1980. Seismic design values were developed for preliminary repository design purposes; 0.25 g horizontal and 0.125 g vertical maximum accelerations for surface, zero-period conditions. Preliminary seismic data indicate broad, smooth areas exist in the bedrock surface in the western portion of the Cold Creek syncline and a gently undulating bedrock surface in the eastern portion. Test results indicate hydraulic property values fall within the range previously reported for sedimentary and interflow zones in basalt formations at the Hanford Site. Preliminary results of available hydrochemical data obtained from several borehole sites indicate that little, if any, vertical mixing of groundwaters is taking place across this stratigraphic boundary. Multiple barrier studies indicate that the primary candidate canister/overpack alloys are TiCode-12, Inconel 625, Incoloy 825, and Zircaloy 2. Low-carbon steel and cast iron are among the list of secondary candidate canister alloys. Laboratory tests of borehole plug designs have shown that it is feasible to design a composite plug system that will satisfactorily seal a nuclear waste repository in Columbia River basalt. The National Lead Industries, Inc., NLI-1/2 Universal Spent Fuel Shipping Cask was selected for use in Phase II operations. Creep test results of samples of Umtanum basalt from borehole DC-6 were plotted and show the day-to-day variation in deformation versus time. The concept selection phase of repository conceptual design was completed in March 1980. A test plan for the Exploratory Shaft Test Facility was developed and is scheduled for submittal to the US Department of Energy in May 1980.

  2. ER Consolidated Quarterly Report October 2014

    Energy Technology Data Exchange (ETDEWEB)

    Cochran, John R. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2014-10-01

    This Environmental Restoration Operations (ER) Consolidated Quarterly Report (ER Quarterly Report) provides the status of ongoing corrective actions and related Long- Term Stewardship (LTS) activities being implemented by Sandia National Laboratories, New Mexico (SNL/NM) ER for the April, May, and June 2014 quarterly reporting period. Section 2.0 provides the status of ER Operations activities including closure activities for the Mixed Waste Landfill (MWL), project management and site closure, and hydrogeologic characterizations. Section 3.0 provides the status of LTS activities that relate to the Chemical Waste Landfill (CWL) and the associated Corrective Action Management Unit (CAMU). Section 4.0 provides the references noted in Section I of this report.

  3. Capital Improvement Program (CIP) Project Status

    Data.gov (United States)

    Montgomery County of Maryland — This dataset includes pertinent information relating to a capital project’s status administered by the Department of Transportation and the Department of General...

  4. Current status of the JET ITER-like Wall Project

    Energy Technology Data Exchange (ETDEWEB)

    Matthews, G F; Edwards, P; Greuner, H; Loving, A; Maier, H; Mertens, Ph; Philipps, V; Riccardo, V; Rubel, M; Ruset, C; Scmidt, A; Villedieu, E [JET-EFDA Culham Science Centre, Abingdon OX14 3DB (United Kingdom)], E-mail: gfm@jet.uk

    2009-12-15

    This paper presents an overview of the status and relevant technical issues for the ITER-like Wall Project with emphasis on progress since the 11th International Workshop on Plasma-Facing Materials and Components for Fusion Applications.

  5. Status of Project Management Education in Pakistan

    Science.gov (United States)

    Arain, Faisal Manzoor; Tipu, Syed Awais Ahmad

    2009-01-01

    Emerging contractual delivery systems, collaborative partnerships, new management initiatives, and global product markets require professionals and students to have a broader awareness of construction methods and project management issues. This paper presents the state of the project management education in Pakistan. The analysis is based on…

  6. Status of Project Management Education in Pakistan

    Science.gov (United States)

    Arain, Faisal Manzoor; Tipu, Syed Awais Ahmad

    2009-01-01

    Emerging contractual delivery systems, collaborative partnerships, new management initiatives, and global product markets require professionals and students to have a broader awareness of construction methods and project management issues. This paper presents the state of the project management education in Pakistan. The analysis is based on…

  7. Status of the LANSCE refurbishment project

    Energy Technology Data Exchange (ETDEWEB)

    Erickson, John L [Los Alamos National Laboratory; Jones, Kevin W [Los Alamos National Laboratory; Prince, Peter P [Los Alamos National Laboratory

    2010-01-01

    The Los Alamos Neutron Science Center (LANSCE) accelerator is an 800-MeV proton linac that drives user facilities for isotope production, proton radiography, ultra-cold neutrons, weapons neutron research and various sciences using neutron scattering. The LANSCE Refurbishment Project (LANSCE-R) is an ambitious project to refurbish key elements of the LANSCE accelerator that are becoming obsolete or nearing end-of-life. The preliminary design phase for the project is funded and underway. The 6 year, $150M (US) project will enable future decades of reliable, high-performance operation. It will replace a substantial fraction of the radio-frequency power systems (gridded tubes and klystrons) with modern systems, completely refurbish the original accelerator control and timing systems, replace obsolete diagnostic devices, and modernize other ancillary systems. An overview of the LANSCE-R project will be presented. The project requirements will be discussed, the preliminary technical solutions presented, and the plan for successful project execution while meeting annual customer expectations for beam delivery will be reviewed.

  8. Exploration and Well Status, Quarter Miles Cells - SaMiRa

    Data.gov (United States)

    U.S. Geological Survey, Department of the Interior — Cell maps are created by the USGS as a method for illustrating the degree of petroleum exploration, type of production as indicated by final well status,...

  9. Tribal Colleges Initiative project. Quarterly report, April 1--June 30, 1998

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-07-01

    The Tribal Colleges Initiative (TCI) grant is in the second year of funding from the US Department of Energy Environmental Management program. This quarterly report includes activities for the first three months (April 1--June 30, 1998) of the Year 2 funding period. The TCI program office requested each Tribal College to write a quarterly report of activities at their respective institutions. These reports are attached. These institutions are Southwestern Indian Polytechnic Institute (SIPI), Crownpoint Institute of Technology (CIT) and the Dine` College (DC, formerly Navajo Community College). The purpose of this program is to offer educational opportunities to Native Americans in the environmental field.

  10. Construction status of the J-PARC project

    CERN Document Server

    Nagamiya, S

    2005-01-01

    From Japanese fiscal year JFY2001, which started on April 1, 2001, a new accelerator project to provide high-intensity proton beams proceeded into its construction phase. This project, which is now called the J-PARC (Japan Proton Accelerator Research Complex) project, is in progress under a cooperation of two institutes, KEK and JAERI. We set a goal to achieve 1MW proton beams at 3GeV and 0.75MW beams at 50GeV. The construction period is 7 years, with anticipated first beams in the spring of 2008. In this article I will describe the project itself and the present status of the project.

  11. Process development status report for advanced manufacturing projects

    Energy Technology Data Exchange (ETDEWEB)

    Brinkman, J.R.; Homan, D.A.

    1990-03-30

    This is the final status report for the approved Advanced Manufacturing Projects for FY 1989. Five of the projects were begun in FY 1987, one in FY 1988, and one in FY 1989. The approved projects cover technology areas in welding, explosive material processing and evaluation, ion implantation, and automated manufacturing. It is expected that the successful completion of these projects well result in improved quality and/or reduced cost for components produced by Mound. Those projects not brought to completion will be continued under Process development in FY 1990.

  12. The NEMO project: A status report

    Science.gov (United States)

    Taiuti, M.; Aiello, S.; Ameli, F.; Amore, I.; Anghinolfi, M.; Anzalone, A.; Barbarino, G.; Battaglieri, M.; Bazzotti, M.; Bersani, A.; Beverini, N.; Biagi, S.; Bonori, M.; Bouhdaef, B.; Brunoldi, M.; Cacopardo, G.; Capone, A.; Caponetto, L.; Carminati, G.; Chiarusi, T.; Circella, M.; Cocimano, R.; Coniglione, R.; Cordelli, M.; Costa, M.; D'Amico, A.; de Bonis, G.; de Rosa, G.; de Ruvo, G.; de Vita, R.; Distefano, C.; Falchini, E.; Flaminio, V.; Fratini, K.; Gabrielli, A.; Galatà, S.; Gandolfi, E.; Giacomelli, G.; Giorgi, F.; Giovanetti, G.; Grimaldi, A.; Habel, R.; Imbesi, M.; Kulikovsky, V.; Lattuada, D.; Leonora, E.; Lonardo, A.; Lo Presti, D.; Lucarelli, F.; Margiotta, A.; Marinelli, A.; Martini, A.; Masullo, R.; Migneco, E.; Minutoli, S.; Morganti, M.; Musico, P.; Musumeci, M.; Nicolau, C. A.; Orlando, A.; Osipenko, M.; Papaleo, R.; Pappalardo, V.; Piattelli, P.; Piombo, D.; Raia, G.; Randazzo, N.; Reito, S.; Ricco, G.; Riccobene, G.; Ripani, M.; Rovelli, A.; Ruppi, M.; Russo, G. V.; Russo, S.; Sapienza, P.; Sciliberto, D.; Sedita, M.; Shirokov, E.; Simeone, F.; Sipala, V.; Spurio, M.; Trasatti, L.; Urso, S.; Vecchi, M.; Vicini, P.; Wischnewski, R.

    2011-01-01

    The latest results and the activities towards the construction of a km3 Cherenkov neutrino detector carried out by the NEMO Collaboration are described. Long-term exploration of a 3500 m deep-sea site close to the Sicilian coast has shown that it is optimal for the installation of the detector. The NEMO Phase-1 project has validated several technologies proposed for the construction of the km3 detector on a test site at 2000 m depth. The new infrastructure on the candidate Capo Passero site set up as part of the Phase-2 project will provide the possibility to test detector components at 3500 m depth.

  13. The NEMO project: A status report

    Energy Technology Data Exchange (ETDEWEB)

    Taiuti, M., E-mail: Mauro.Taiuti@ge.infn.i [INFN Sezione di Genova, Via Dodecaneso 33, 16146 Genova (Italy); Dipartimento di Fisica, Universita di Genova, Via Dodecaneso 33, 16146 Genova (Italy); Aiello, S. [INFN Sezione di Catania, Via S. Sofia 64, 95123 Catania (Italy); Ameli, F. [INFN Sezione di Roma 1, P.le A. Moro 2, 00185 Roma (Italy); Amore, I. [Laboratori Nazionali del Sud INFN, Via S. Sofia 62, 95123 Catania (Italy); Dipartimento di Fisica e Astronomia, Universita di Catania, Via S. Sofia 64, 95123 Catania (Italy); Anghinolfi, M. [INFN Sezione di Genova, Via Dodecaneso 33, 16146 Genova (Italy); Anzalone, A. [Laboratori Nazionali del Sud INFN, Via S. Sofia 62, 95123 Catania (Italy); Barbarino, G. [INFN Sezione di Napoli, Via Cintia, 80126 Napoli (Italy); Dipartimento di Scienze Fisiche, Universita di Napoli, Via Cintia, 80126 Napoli (Italy); Battaglieri, M. [INFN Sezione di Genova, Via Dodecaneso 33, 16146 Genova (Italy); Bazzotti, M. [INFN Sezione di Bologna, V.le Berti Pichat 6/2, 40127 Bologna (Italy); Dipartimento di Fisica, Universita di Bologna, V.le Berti Pichat 6/2, 40127 Bologna (Italy); Bersani, A. [INFN Sezione di Genova, Via Dodecaneso 33, 16146 Genova (Italy); Beverini, N. [INFN Sezione di Pisa, Polo Fibonacci, Largo B. Pontecorvo 3, 56127 Pisa (Italy); Dipartimento di Fisica, Universita di Pisa, Polo Fibonacci, Largo B. Pontecorvo 3, 56127 Pisa (Italy); Biagi, S. [INFN Sezione di Bologna, V.le Berti Pichat 6/2, 40127 Bologna (Italy); Dipartimento di Fisica, Universita di Bologna, V.le Berti Pichat 6/2, 40127 Bologna (Italy); Bonori, M. [INFN Sezione di Roma 1, P.le A. Moro 2, 00185 Roma (Italy); Dipartimento di Fisica, Universita di Roma La Sapienza, P.le A. Moro 2, 00185 Roma (Italy); Bouhdaef, B. [INFN Sezione di Pisa, Polo Fibonacci, Largo B. Pontecorvo 3, 56127 Pisa (Italy); Dipartimento di Fisica, Universita di Pisa, Polo Fibonacci, Largo B. Pontecorvo 3, 56127 Pisa (Italy)

    2011-01-21

    The latest results and the activities towards the construction of a km{sup 3} Cherenkov neutrino detector carried out by the NEMO Collaboration are described. Long-term exploration of a 3500 m deep-sea site close to the Sicilian coast has shown that it is optimal for the installation of the detector. The NEMO Phase-1 project has validated several technologies proposed for the construction of the km{sup 3} detector on a test site at 2000 m depth. The new infrastructure on the candidate Capo Passero site set up as part of the Phase-2 project will provide the possibility to test detector components at 3500 m depth.

  14. Basalt Waste Isolation Project. Drilling and testing quarterly report, January 1, 1983-March 31, 1983

    Energy Technology Data Exchange (ETDEWEB)

    1983-04-01

    This document is a summary of dilling and testing results during the first calendar quarter (January through March 1983). The principal work during this period included the drilling and/or testing of boreholes RRL-2, RRL-6, RRL-14, DC-4/DC-5, DC-16A, DC-16B, and the McGee Well. Specific highlights of this work are summarized.

  15. Coal liquefaction. Quarterly report, January--March 1978. [Brief summary of 15 pilot plant projects supported by US DOE

    Energy Technology Data Exchange (ETDEWEB)

    1978-09-01

    The advantage of coal liquefaction is that the entire range of liquid products, including heavy boiler fuel, distillate fuel oil, gasoline, jet fuel, and diesel oil, can be produced from coal by varying the type of process and operating conditions used in the process. Furthermore, coal-derived liquids have the potential for use as chemical feedstocks. To provide efficient and practical means of utilizing coal resources, DOE is sponsoring the development of several conversion processes currently in the pilot plant stage. Fifteen coal liquefaction projects supported by US DOE are described briefly, with flowsheets, funding, history and progress during the quarter. (LTN)

  16. Geothermal direct-heat utilization assistance. Quarterly project progress report, July 1996--September 1996. Federal Assistance Program

    Energy Technology Data Exchange (ETDEWEB)

    Lienau, P.

    1996-11-01

    This report summarizes geothermal technical assistance, R&D and technology transfer activities of the Geo-Heat Center at Oregon Institute of Technology for the fourth quarter of FY-96. It describes 152 contacts with parties during this period related to technical assistance with geothermal direct heat projects. Areas dealt with include geothermal heat pumps, space heating, greenhouses, aquaculture, equipment, economics and resources. Research activities are summarized on greenhouse peaking. Outreach activities include the publication of a geothermal direct use Bulletin, dissemination of information, geothermal library, technical papers and seminars, and progress monitor reports on geothermal resources and utilization.

  17. Status of the Baikal-GVD project

    Energy Technology Data Exchange (ETDEWEB)

    Avrorin, A.V.; Aynutdinov, V.M. [Institute for Nuclear Research, Moscow 117312 (Russian Federation); Bannasch, R. [EvoLogics GmbH, Berlin (Germany); Belolaptikov, I.A. [Joint Institute for Nuclear Research, Dubna 141980 (Russian Federation); Bogorodsky, D.Yu. [Irkutsk State University, Irkutsk 664003 (Russian Federation); Brudanin, V.B. [Joint Institute for Nuclear Research, Dubna 141980 (Russian Federation); Budnev, N.M. [Irkutsk State University, Irkutsk 664003 (Russian Federation); Danilchenko, I.A.; Domogatsky, G.V.; Doroshenko, A.A. [Institute for Nuclear Research, Moscow 117312 (Russian Federation); Dyachok, A.N. [Irkutsk State University, Irkutsk 664003 (Russian Federation); Dzhilkibaev, Zh-A.M., E-mail: djilkib@yandex.ru [Institute for Nuclear Research, Moscow 117312 (Russian Federation); Fialkovsky, S.V. [Nizhni Novgorod State Technical University, Nizhni Novgorod 603950 (Russian Federation); Gaponenko, O.N. [Institute for Nuclear Research, Moscow 117312 (Russian Federation); Golubkov, K.V. [Joint Institute for Nuclear Research, Dubna 141980 (Russian Federation); Gress, O.A.; Gress, T.I.; Grishin, O.G. [Irkutsk State University, Irkutsk 664003 (Russian Federation); Kebkal, K.G.; Kebkal, A.G. [EvoLogics GmbH, Berlin (Germany); and others

    2012-11-11

    The construction of a km{sup 3}-scale neutrino telescope - the Gigaton Volume Detector (GVD) in Lake Baikal - is the central goal of the Baikal collaboration. During the R and D phase of the GVD project in 2008-2010 years the basic elements of GVD - new optical modules, FADC readout units, underwater communications and trigger systems - have been developed, produced and tested in situ by long-term operating prototype strings in Lake Baikal. The prototyping phase of the GVD project has been started in April 2011 with the installation of a three string array (prototype cluster) which comprises all basic elements and systems of the GVD-telescope in Lake Baikal. We describe configuration and technical design of the GVD, present selected results obtained during 2008-2010 with prototype strings, and describe configuration and design of the 2011 prototype cluster.

  18. NGNP Project 2011 Status and Path Forward

    Energy Technology Data Exchange (ETDEWEB)

    L.E. Demick

    2011-12-01

    High Temperature Gas Reactor (HTGR) technology can play an important role in the United States’ energy future by extending the use of nuclear energy for non-electricity energy production missions as well as continuing to provide a considerable base load electric power generation capability. Extending nuclear energy into the industrial and transportation sectors through the co-production of process heat and electricity provides safe and reliable energy for these sectors in an environmentally responsible manner. The safety case for the modular HTGR provides a substantial improvement in nuclear plant safety for the protection of the public and the environment, and supports collocation of the HTGR with major industrial facilities. The NGNP Project at the Idaho National Laboratory has been working toward an objective of commercializing the HTGR technology under DOE direction since 2006. The Project is undergoing a quantum shift in direction and scope as a result of recent DOE decisions. This paper summarizes where the Project has been, where it is at the time of this writing and what is needed in future activities to commercialize HTGR technology.

  19. Status of the Fermilab electron cooling project

    Energy Technology Data Exchange (ETDEWEB)

    Nagaitsev, S. E-mail: nsergei@fnal.gov; Burov, A.; Carlson, K.; Dudnikov, V.; Kramper, B.; Kroc, T.; Leibfritz, J.; McGee, M.; Saewert, G.; Schmidt, C.W.; Shemyakin, A.; Warner, A.; Seletsky, S.; Tupikov, V

    2004-10-11

    A prototype of a 4.3-MeV electron cooling system has been assembled at Fermilab as part of the on-going R and D program in high-energy electron cooling. This electron cooler prototype will not demonstrate the actual cooling but it would allow to determine if the electron beam properties are suitable for antiproton beam cooling. An electron beam is accelerated by a 5-MV Pelletron (Van de Graaff type) accelerator and transported to a prototype cooling section. The cooling would take place in a 20-m long solenoid flanked on both sides by supply and return beam-lines--a total of 60 m of transport channel. This paper describes the status of the electron cooling R and D program.

  20. Status of the AUSTRON spallation project

    Science.gov (United States)

    Rauch, H.; Regler, M.; Weber, H.

    2000-03-01

    The characteristic parameters of the present version of the planned AUSTRON neutron spallation source are: (a) 10 Hz repetition rate at the target, (b) 500 kW average beam power, (c) 1.6 GeV proton energy and (d) strongly dedicated to cold neutron research. The machine can be built based on existing techniques and would provide a performance gain between 3 and 10 compared to existing installations. Progress has been made in the planning of the instrumentation where an improved standard instrumentation and several new systems have been designed and evaluated by an international group of neutron scientists. A clean room area with vibration, temperature and humidity control provides new possibilities for neutron optics, neutron reflectometry and nuclear orientation experiments. A proposed magnetic focusing line with an active energy transfer system indicates the capability to achieve a further intensity gain by a factor of 10. The status of the ongoing internationalization process will be reported as well.

  1. Western Gas Sands Project status report

    Energy Technology Data Exchange (ETDEWEB)

    Atkinson, C.H.

    1978-11-30

    Progress of government-sponsored projects directed toward increasing gas production from the low-permeability gas sands of the western United States is summarized. A Technology Implementation Plan (TIP) meeting was held at the CER office in Las Vegas, Nevada, October 16--19 to initiate the implementation phase of the Enhanced Gas Recovery (EGR) working group activities. A WGSP Logging Program meeting was conducted on October 24, 1978, at CER offices to define the problems associated with logs in tight gas sands. CER personnel and the project manager attended a two-day course on the fundamentals of core and reservoir analysis in Denver, Colorado, and met with USGS personnel to discuss USGS work on the WGSP. A meeting was held to discuss a contract for coring a Twin Arrow well on the Douglas Creek Arch, Colorado. CER Corporation personnel attended the Geological Society of America Annual Meeting held in Toronto, Canada, October 23--27 and a Gas Stimulation Workshop at Sandia Laboratories in Albuquerque, New Mexico, October 11 and 12 to discuss recent mineback experiments conducted at the Nevada Test Site. Fiscal year 1979 projects initiated by USGS and the Energy Technology Centers and National Laboratories are progressing as scheduled. Mobil Research and Development Corporation fractured zone 8 of the F-31-13G well in Rio Blanco County, Colorado. Colorado Interstate Gas Company poured the concrete pad for the compresser expected to be delivered in December and were laying pipeline between the wells at month end. The Mitchell Energy well, Muse Duke No. 1 was flowing on test at a rate of 2,100 Mcfd and preparations proceeded to fracture the well on November 15 with approximately 1,000,000 gal of fluid and 3,000,000 lb of sand. Terra Tek completed laboratory analyses of cores taken from the Mitchell Energy well.

  2. The MAJORANA Project: a status report

    Energy Technology Data Exchange (ETDEWEB)

    Elliott, Steven Ray [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2015-06-09

    This series of slides presents the topic under the following aspects: ββ sensitivity, underground laboratory, shield, monoliths, strings, detectors, electroformed small parts, and background. Assembly and construction are proceeding at Sanford Davis Campus laboratory. Based on assays, material backgrounds are projected to meet cleanliness goals. Module 1 is complete. Electroformed copper has just been completed at SURF and PNNL. The shield is nearly complete. Successful reduction and refinement of enrGe has taken place with 98% yield. AMTEK (ORTEC) has produced 27 kg within 32 detectors from the reduced/refined enrGe; 30 of these are underground at SURF being assembled into strings.

  3. Status and performances of the FAZIA project

    Science.gov (United States)

    Rivet, M. F.; Bonnet, E.; Borderie, B.; Bougault, R.; Edelbruck, P.; Le Neindre, N.; Barlini, S.; Carboni, S.; Casini, G.; Rosato, E.; Tortone, G.; FAZIA Collaboration

    2013-03-01

    FAZIA is designed for detailed studies of the isospin degree of freedom, extending to the limits the isotopic identification of charged products from nuclear collisions when using silicon detectors and CsI(Tl) scintillators. We show that the FAZIA telescopes give isotopic identification up to Z~25 with a ΔE-E technique. Digital Pulse Shape Analysis makes possible elemental identification up to Z=55 and isotopic identification for Z=1-10 when using the response of a single silicon detector. The project is now in the phase of building a demonstrator comprising about 200 telescopes.

  4. Status and performances of the FAZIA project

    CERN Document Server

    Rivet, M -F; Borderie, B; Bougault, R; Edelbruck, P; Neindre, N Le; Barlini, S; Carboni, S; Casini, G; Rosato, E; Tortone, G

    2012-01-01

    FAZIA is designed for detailed studies of the isospin degree of freedom, extending to the limits the isotopic identification of charged products from nuclear collisions when using silicon detectors and CsI(Tl) scintillators. We show that the FAZIA telescopes give isotopic identification up to Z$\\sim$25 with a $\\Delta$E-E technique. Digital Pulse Shape Analysis makes possible elemental identification up to Z=55 and isotopic identification for Z=1-10 when using the response of a single silicon detector. The project is now in the phase of building a demonstrator comprising about 200 telescopes.

  5. Geothermal direct-heat utilization assistance. Quarterly project progress report, July 1994--September 1994

    Energy Technology Data Exchange (ETDEWEB)

    1994-10-01

    This paper is a third quarter 1994 report of activities of the Geo-Heat Center of Oregon Institute of Technology. It describes contacts with parties during this period related to assistance with geothermal direct heat applications. Areas dealt with include geothermal heat pumps, space heating, greenhouses, aquaculture, resources, and equipment. Research is also being conducted on failures of vertical lineshaft turbines in geothermal wells.

  6. Geothermal direct-heat utilization assistance. Federal Assistance Program quarterly project progress report, April 1--June 30, 1998

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-07-01

    This report summarizes geothermal technical assistance, R and D and technology transfer activities of the Geo-Heat Center at Oregon Institute of Technology for the third quarter of FY98 (April--June, 1998). It describes 231 contacts with parties during this period related to technical assistance with geothermal direct heat projects. Areas dealt with included requests for general information including material for high school and university students, and material on geothermal heat pumps, resource and well data, spacing heating and cooling, greenhouses, aquaculture, equipment, district heating, resorts and spas, industrial applications, snow melting and electric power. Research activities include work on model construction specifications for line shaft submersible pumps and plate heat exchangers, and a comprehensive aquaculture developers package. A brochure on Geothermal Energy in Klamath County was developed for state and local tourism use. Outreach activities include the publication of the Quarterly Bulletin (Vol. 19, No. 2) with articles on research at the Geo-Heat Center, sustainability of geothermal resources, injection well drilling in Boise, ID and a greenhouse project in the Azores. Other outreach activities include dissemination of information mainly through mailings of publications, tours of local geothermal uses, geothermal library acquisitions and use, participation in workshops, short courses and technical meetings by the staff, and progress monitor reports on geothermal activities.

  7. Status of PACMAN Project at CERN

    CERN Document Server

    Catalan-Lasheras, Nuria; Modena , Michele

    2015-01-01

    Though the Large Hadron Collider (LHC) at CERN is just at the start of a program expected to run for 20 additional years, CERN is studying the next generation of colliders, like the Compact Linear Collider (CLIC). This project proposes an electron-positron collider with a length close to 50 km and with a centre of mass energy of 3 TeV at the collision point. One of the main challenges is the sub-micrometric size of the beams, down to a few nanometres at the interaction point. As a consequence, the accelerator will require unprecedented nanometric tolerances of beam alignment. A series of several thousands components will have to be assembled, aligned at the micrometre level and most critically, stabilized actively at the nanometre level. PACMAN, a study on Particle Accelerator Components Metrology and Alignment to the Nanometre scale, is a Marie Curie Program supported by the European Commission (FP7 Program), creating a network of 16 Academic and Industrial Partners. The project is hosted at CERN and it offe...

  8. Current status of the CLIO project

    CERN Document Server

    Yamamoto, K; Miyoki, S; Ohashi, M; Kuroda, K; Ishitsuka, H; Akutsu, T; Telada, S; Tomaru, T; Suzuki, T; Sato, N; Saitô, Y; Higashi, Y; Haruyama, T; Yamamoto, A; Shintomi, T; Tatsumi, D; Ando, M; Tagoshi, H; Kanda, N; Awaya, N; Yamagishi, S; Takahashi, H; Araya, A; Takamori, A; Takemoto, S; Higashi, T; Hayakawa, H; Morii, W; Akamatsu, J

    2008-01-01

    CLIO (Cryogenic Laser Interferometer Observatory) is a Japanese gravitational wave detector project. One of the main purposes of CLIO is to demonstrate thermal-noise suppression by cooling mirrors for a future Japanese project, LCGT (Large-scale Cryogenic Gravitational Telescope). The CLIO site is in Kamioka mine, as is LCGT. The progress of CLIO between 2005 and 2007 (room- and cryogenic-temperature experiments) is introduced in this article. In a room-temperature experiment, we made efforts to improve the sensitivity. The current best sensitivity at 300 K is about $6 \\times 10^{-21} /\\sqrt{\\rm Hz}$ around 400 Hz. Below 20 Hz, the strain (not displacement) sensitivity is comparable to that of LIGO, although the baselines of CLIO are 40-times shorter (CLIO: 100m, LIGO: 4km). This is because seismic noise is extremely small in Kamioka mine. We operated the interferometer at room temperature for gravitational wave observations. We obtained 86 hours of data. In the cryogenic experiment, it was confirmed that the...

  9. Geothermal direct-heat utilization assistance: Federal assistance program. Quarterly project progress report, October--December 1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-02-01

    The report summarizes geothermal technical assistance, R&D and technology transfer activities of the Geo-Heat Center at Oregon Institute of Technology for the first quarter of FY-96. It describes 90 contacts with parties during this period related to technical assistance with geothermal direct heat projects. Areas dealt with include geothermal heat pumps, space heating, greenhouses, aquaculture, equipment and resources. Research activities are summarized on low-temperature resource assessment, geothermal district heating system cost evaluation and silica waste utilization project. Outreach activities include the publication of a geothermal direct use Bulletin, dissemination of information, geothermal library, technical papers and seminars, development of a webpage, and progress monitor reports on geothermal resources and utilization.

  10. Minnesota Agri Power Project. Quarterly report, July 1, 1997--September 30, 1997

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-10-01

    Program status and accomplishments for a project to develop alfalfa as a biomass fuel for power generation are summarized in this report. The main areas of reporting include: (1) alfalfa separation pilot plant testing, (2) design of gasification plant, (3) alfalfa leaf meal feeding trials and analysis, (4) integrated plant design and cost estimate, and (5) site plan construction and environmental permits. The alfalfa separation pilot plant fractionation equipment encountered operating problems from rocks and other tramp materials in the alfalfa bales. An investigation of techniques and equipment to remove the tramp materials resulted in the selection of a vibrating conveyor system. The Carbona gasification plant design basis and the Westinghouse scope of supply and design basis for the hot gas filter are provided in the report. The alfalfa leaf meal feeding trials showed that this economically critical co-product can be a viable livestock feed ingredient if favorable price, availability, and quality are maintained. The Stone and Webster basis of design for the integrated plant is included, and the basis for development of gas turbine performance runs is also detailed.

  11. The ANTARES neutrino project: status report

    CERN Document Server

    Sokalski, I A

    2004-01-01

    The ANTARES project aims to build a deep underwater Cherenkov neutrino telescope in the Mediterranean Sea. Currently the experiment is in the construction phase and has recently achieved two important milestones. The electro-optical cable to shore and the junction box that will distribute power to detector strings and allow data transmission have been deployed at the sea floor. A prototype string and a string for environmental parameter measurement have been deployed, connected to the cable using a manned submarine. Data have been sent to shore. The final ANTARES detector consisting in 12 strings each equipped with 75 photomultiplier tubes is planned to be fully deployed and taking data by the end of 2006.

  12. Regional Assessment of Supplementation Project : Status Report.

    Energy Technology Data Exchange (ETDEWEB)

    Unknown author

    1991-10-01

    The Fish and Wildlife Program of the Northwest Power Planning Council (NPPC) prescribes several approaches to achieve its goal of doubling the salmon and steelhead runs of the Columbia River. Among those approaches are habitat restoration, improvements in adult and juvenile passage at dams and artificial propagation. Supplementation will be a major part of the new hatchery programs. The purpose of the Regional Assessment of Supplementation Project (RASP) is to provide an overview of ongoing and planned supplementation activities, to construct a conceptual framework and model for evaluating the potential benefits and risks of supplementation and to develop a plan for better regional coordination of research and monitoring and evaluation of supplementation. RASP has completed its first year of work. Progress toward meeting the first year's objectives and recommendations for future tasks are contained in this report.

  13. Regional Assessment of Supplementation Project. Status report

    Energy Technology Data Exchange (ETDEWEB)

    1991-10-01

    The Fish and Wildlife Program of the Northwest Power Planning Council (NPPC) prescribes several approaches to achieve its goal of doubling the salmon and steelhead runs of the Columbia River. Among those approaches are habitat restoration, improvements in adult and juvenile passage at dams and artificial propagation. Supplementation will be a major part of the new hatchery programs. The purpose of the Regional Assessment of Supplementation Project (RASP) is to provide an overview of ongoing and planned supplementation activities, to construct a conceptual framework and model for evaluating the potential benefits and risks of supplementation and to develop a plan for better regional coordination of research and monitoring and evaluation of supplementation. RASP has completed its first year of work. Progress toward meeting the first year`s objectives and recommendations for future tasks are contained in this report.

  14. Current status and progresses of SSRF project

    Institute of Scientific and Technical Information of China (English)

    2008-01-01

    The Shanghai Synchrotron Radiation Facility(SSPF),a third generation light source,comprises a 3.5GeV electron storage ring,a full energy booster,a 150 MeV linac,and seven beamlines in Phase Ⅰ of the project.Beginning at the end of 2004 with a groundbreaking ceremony,the accelerators were installed in ten months from November 2006,and were successfully tested and commissioned in the past a couple of months.On December 21,2007,storing electron beams in the storage ring was realized,and the first synchrotron radiations were observed three days later on the front-end of Beamline BL16B of the facility.Now,it runs 3 GeV 100 mA beams with a lifetime of 8~10 hours.Meanwhile,construction of the first seven beamlines(five ID beamlines and two bending magnet beamlines)is progressing on schedule.

  15. Current Status of the Pierre Auger Project

    Science.gov (United States)

    Etchegoyen, A.

    The Pierre Auger Project aims at building two Observatories in order to study ultra high energy cosmic rays, situated in both northern and southern hemispheres. In 2000 started the construction of the austral observatory. Prior to this, in 1995, the international collaboration was formed encompassing 200 scientists and technicians from institutions in 16 countries. The Auger Project is a basic science enterprise which studies the highest energies known in nature ( 1020 eV) , which are cosmic rays coming from the outer space arriving to the earth surface with at a very reduced flow. This is the reason for constructing a giant observatory spanning an area of 3000 km2 in the department of Malargüe and San Rafael, in the Province of Mendoza. Other distinctive feature, besides the exceptional size of the Observatory, is its hybrid nature: it is constituted by 24 fluorescence detector telescopes .and 1600 surface detectors. As such, it will provide a large number of events with less systematic detection uncertainties. The construction of the Observatory is quite advanced and the buildings at the Central Station in Malargüe city are already operational. So are the telescope buildings at Cerros Los Leones and Coihueco, two telescopes, 32 surface detectors, the telecommunication and data adquisión systems. From the scientific point of view the most important issue was the first detection of an hybrid event (a cosmic ray detected by both telescope and the surface detectors), on January 2002. It confirmed the equipment operates with the design parameters. Twenty hybrid events/month were detected with energies typically below 1019 eV.

  16. Status of the REX-ISOLDE project

    Science.gov (United States)

    Kester, O.; Habs, D.; Sieber, T.; Bongers, H.; Rudolph, K.; Kolbe, A.; Thirolf, P.; Bollen, G.; Deloose, I.; Evensen, A. H.; Ravn, H.; Ames, F.; Schmidt, P.; Huber, G.; von Hahn, R.; Podlech, H.; Repnow, R.; Schwalm, D.; Liljeby, L.; Rensfelt, K. G.; Wenander, F.; Jonsson, B.; Nyman, G.; Schempp, A.; Kühnel, K.-U.; Welsch, C.; Ratzinger, U.; van Duppen, P.; Huyse, M.; Weismann, L.; Shotter, A.; Ostrowski, A.; Davison, T.; Woods, P. J.

    1999-06-01

    The Radioactive beam Experiment (REX-ISOLDE)(1,2,3) at ISOLDE/CERN is under progress and first tests are carried out with some of the structures. The radioactive ions from the online mass separator ISOLDE will be cooled and bunched in a Penning trap, charge bred in an electron beam ion source (EBIS) and finally accelerated in a short LINAC to a target energy between 0.8 and 2.2 MeV/u. The LINAC consists of a radio frequency quadrupole (RFQ) accelerator, which accelerates the ions up to 0.3 MeV/u, an interdigital H-type (IH) structure with a final energy between 1.1 and 1.2 MeV/u and three seven gap resonators, which allow the variation of the final energy. All components of the experiment are now in production or undergo first test measurements. Such measurements are ion capture tests of the trap, electron beam tests of the EBIS, low level measurements and first power tests of the RFQ and the first 7-gap resonator. In this paper the status of the experiment, and the proposed schedule are presented.

  17. Pharmacist provider status legislation: Projections and prospects.

    Science.gov (United States)

    Harper, Patrick C

    2015-01-01

    To compare legislation at the federal level that would recognize pharmacists as health care providers under Medicare Part B with similar state-level efforts in an attempt to identify the strengths and weaknesses of these options and forecast outcomes. The current primary care provider shortage poses a significant threat to public health in the United States. The effort to achieve federal provider status for pharmacists, currently in the form of identical bills introduced in January 2015 into the U.S. House of Representatives and the U.S. Senate as the Pharmacy and Medically Underserved Areas Enhancement Act (H.R. 592 and S. 314), would amend the Social Security Act to recognize pharmacists as health care providers in sections of Medicare Part B that specify coverage and reimbursement. This action has budgetary implications owing to the compensation that would accrue to pharmacists caring for Medicare beneficiaries. Passage of these bills into law could improve public health by sustainably increasing access to pharmacists' patient care services in medically underserved areas. In this article, the legislation's strengths and weaknesses are analyzed. The resulting information may be used to forecast the bills' fate as well as plan strategies to help support their success. Comparison of the bills with existing, state-level efforts is used as a framework for such policy analysis. While the current political climate benefits the bills in the U.S. Congress, established legislative precedents suggest that parts of H.R. 592/S. 314, specifically those regarding compensation mechanisms, may require negotiated amendment to improve their chances of success.

  18. Status of the Cherenkov telescope array project

    Science.gov (United States)

    Barres de Almeida, Ulisses

    2015-12-01

    Gamma-ray astronomy holds a great potential for Astrophysics, Particle Physics and Cosmology. The CTA is an international initiative to build the next generation of ground-based gamma-ray observatories, which will represent a factor of 5-10× improvement in the sensitivity of observations in the range 100 GeV - 10 TeV, as well as an extension of the observational capabilities down to energies below 100 GeV and beyond 100 TeV. The array will consist of two telescope networks (one in the Northern Hemisphere and another in the South) so to achieve a full-sky coverage, and will be composed by a hybrid system of 4 different telescope types. It will operate as an observatory, granting open access to the community through calls for submission of proposals competing for observation time. The CTA will give us access to the non-thermal and high-energy universe at an unprecedented level, and will be one of the main instruments for high-energy astrophysics and astroparticle physics of the next 30 years. CTA has now entered its prototyping phase with the first, stand-alone instruments being built. Brazil is an active member of the CTA consortium, and the project is represented in Latin America also by Argentina, Mexico and Chile. In the next few months the consortium will define the site for installation of CTA South, which might come to be hosted in the Chilean Andes, with important impact for the high-energy community in Latin America. In this talk we will present the basic concepts of the CTA and the detailed project of the observatory. Emphasis will be put on its scientific potential and on the Latin-American involvement in the preparation and construction of the observatory, whose first seed, the ASTRI mini-array, is currently being constructed in Sicily, in a cooperation between Italy, Brazil and South Africa. ASTRI should be installed on the final CTA site in 2016, whereas the full CTA array is expected to be operational by the end of the decade.

  19. Western Gas Sands Project: status report

    Energy Technology Data Exchange (ETDEWEB)

    1978-05-01

    Progress of the major government sponsored projects undertaken to increase gas production from low permeability gas sands of the western United States during March 1978 is summarized. The Bartlesville Energy Research Center (BERC) and participating National Laboratories, funded by DOE, are continuing their work in the area of research and development. The emphasis is on the development of new tools and instrumentation systems, rock mechanics, mathematical modeling and data analysis. Field Tests and demonstrations active in the Uinta and Piceance Basins include: Gas Producing Enterprises (GPE) Natural Buttes Unit Wells No. 9, 14, 18, 19, 20, 21 and 22, Mobil Research and Development Corporation, Well No. F-31-13G, and Rio Blanco Natural Gas Company, Well No. 498-4-1. Gas Producing Enterprises Natural Buttes Unit Well No. 9 was fractured on March 27, 1978. The treatment consisted of 554,000 pounds of sand and 349,000 gallons of gel. Mitchell Energy Corporation of Houston, Texas was awarded Department of Energy Contract EF-78-C-08-1547 on March 15, 1978. Field work under this contract is scheduled to begin on June 15, 1978, with the drilling of a new well.

  20. Improved recovery from Gulf of Mexico reservoirs. Quarterly status report, January 1--March 31, 1996

    Energy Technology Data Exchange (ETDEWEB)

    Kimbrell, W.C.; Bassiouni, Z.A.; Bourgoyne, A.T.

    1996-04-30

    On February 18, 1992, Louisiana State University with two technical subcontractors, BDM, Inc. and ICF, Inc., began a research program to estimate the potential oil and gas reserve additions that could result from the application of advanced secondary and enhanced oil recovery technologies and the exploitation of undeveloped and attic oil zones in the Gulf of Mexico oil fields that are related to piercement salt domes. This project is a one year continuation of this research and will continue work in reservoir description, extraction processes, and technology transfer. Detailed data will be collected for two previously studies reservoirs: a South Marsh Island reservoir operated by Taylor Energy and one additional Gulf of Mexico reservoir operated by Mobil. Additional reservoirs identified during the project will also be studied if possible. Data collected will include reprocessed 2-D seismic data, newly acquired 3-D data, fluid data, fluid samples, pressure data, well test data, well logs, and core data/samples. The new data will be used to refine reservoir and geologic characterization of these reservoirs. Further laboratory investigation will provide additional simulation input data in the form of PVT properties, relative permeabilities, capillary pressure, and water compatibility. Geological investigations will be conducted to refine the models of mud-rich submarine fan architectures used by seismic analysts and reservoir engineers. Research on advanced reservoir simulation will also be conducted. This report describes a review of fine-grained submarine fans and turbidite systems.

  1. Great Basin paleoenvironmental studies project; Technical progress report: First quarter (January--August 1993)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1993-12-31

    Project goals, project tasks, progress on tasks, and problems encountered are described and discussed for each of the studies that make up the Great Basin Paleoenvironmental Studies Project for Yucca Mountain. These studies are: Paleobotany, Paleofauna, Geomorphology, and Transportation. Budget summaries are also given for each of the studies and for the overall project.

  2. Nucla circulating atmospheric fluidized bed demonstration project. Quarterly technical progress report, October--December 1990

    Energy Technology Data Exchange (ETDEWEB)

    1991-01-31

    During the fourth quarter of 1990, steady-state performance testing at the Nucla Circulating Fluidized Bed (CFB) resumed under sponsorship of the US Department of Energy. Co-sponsorship of the Demonstration Test Program by the Electric Power Research Institute (EPRI) was completed on June 15, 1990. From October through December, 1990, Colorado-Ute Electric Association (CUEA) completed a total of 23 steady-state performance tests, 4 dynamic tests, and set operating records during November and December as the result of improved unit operating reliability. Highlight events and achievements during this period of operation are presented.

  3. Fuel Cell Technology Status Analysis Project: Partnership Opportunities

    Energy Technology Data Exchange (ETDEWEB)

    2017-03-13

    Fact sheet describing the National Renewable Energy Laboratory's (NREL's) Fuel Cell Technology Status Analysis Project. NREL is seeking fuel cell industry partners from the United States and abroad to participate in an objective and credible analysis of commercially available fuel cell products to benchmark the current state of the technology and support industry growth.

  4. Current status of the JET ITER-like Wall Project

    OpenAIRE

    Matthews, G. F.; Edwards, P; H. Greuner; Loving, A.; Maier, H; Mertens, Ph; Philipps, V.; Riccardo, V.; Rubel, Marek J.; Ruset, C.; Scmidt, A.; Villedieu, E.

    2009-01-01

    This paper presents an overview of the status and relevant technical issues for the ITER-like Wall Project with emphasis on progress since the 11th International Workshop on Plasma-Facing Materials and Components for Fusion Applications. QC 20101118

  5. Projects at the Western Environmental Technology Office. Quarterly technical progress report, April 1--June 30, 1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-08-01

    This report contains brief outlines of the multiple projects under the responsibility of the Western Environmental Technology Office in Butte Montana. These projects include biomass remediation, remediation of contaminated soils, mine waste technology, and several other types of remediation.

  6. Geothermal policy project. Quarterly report, September 1, 1980-November 30, 1980

    Energy Technology Data Exchange (ETDEWEB)

    1981-01-01

    Efforts continued to carry forward policy development in existing project states. Follow-up contacts were made with most project states, and state visits and meetings occurred in eight project states. Several state-specific documents and one background document, geothermal Policies in Selected States, were prepared during this reporting period. In Yakima, Washington, the project cosponsored a geothermal symposium with the Washington State Energy Office, in addition to attending several other geothermal meetings and conferences.

  7. ARTI/MCRL Project Report products of motor burnout (Second quarter report)

    Energy Technology Data Exchange (ETDEWEB)

    Hawley-Fedder, R.

    1995-01-15

    The OSP (Operating Safety Procedure) required for performance of electrical arc testing of CFC replacement fluids was renewed. Electrical breakdown tests at one (1) atmosphere pressure have been performed for R-22, R-134a, and R-125/R-143a (50:50 blend; AZ-50), and breakdown products identified. No differences in HCFC breakdown products are seen in the presence or absence of lubricant oils. The design of the high pressure-high temperature test stand has been finalized, and construction initiated during this quarter. Three motor stators and rotors were received from Tecumseh Products Company for use in motor burnout tests. A test plan for the motor breakdown tests is in preparation.

  8. Contracts for field projects and supporting research on enhanced oil recovery and improved drilling technology. Progress review No. 34, quarter ending March 31, 1983

    Energy Technology Data Exchange (ETDEWEB)

    Linville, B. (ed.)

    1983-07-01

    Progress achieved for the quarter ending March 1983 are presented for field projects and supporting research for the following: chemical flooding; carbon dioxide injection; and thermal/heavy oil. In addition, progress reports are presented for: resource assessment technology; extraction technology; environmental and safety; microbial enhanced oil recovery; oil recovered by gravity mining; improved drilling technology; and general supporting research. (ATT)

  9. ISTAR: Project Status and Ground Test Engine Design

    Science.gov (United States)

    Quinn, Jason Eugene

    2003-01-01

    Review of the current technical and programmatic status of the Integrated System Test of an Airbreathing Rocket (ISTAR) project. November 2002 completed Phase 1 of this project: which worked the conceptual design of the X-43B demonstrator vehicle and Flight Test Engine (FTE) order to develop realistic requirements for the Ground Test Engine (GTE). The latest conceptual FTE and X-43B configuration is briefly reviewed. The project plan is to reduce risk to the GTE and FTE concepts through several tests: thruster, fuel endothermic characterization, engine structure/heat exchanger, injection characterization rig, and full scale direct connect combustion rig. Each of these will be discussed along with the project schedule. This discussion is limited due to ITAR restrictions on open literature papers.

  10. Minnesota agri-power project. Quarterly report, January--March 1997

    Energy Technology Data Exchange (ETDEWEB)

    Baloun, J.

    1997-04-01

    This project involves the growing of trial quantities of alfalfa for gasification pilot plant tests and the use of by-products of alfalfa plants as animal feeds for beef and dairy cattle and turkeys. The various tasks under this project are described. Tasks are: design; review and confirm feedstock supply plan; performance guarantees and warranties; sales contracts; site plan construction and environmental permits report; environmental monitoring plan; and project management, engineering, and administration.

  11. Current status of the BAIKAL-GVD project

    Energy Technology Data Exchange (ETDEWEB)

    Avrorin, A.V. [Institute for Nuclear Research, RAS, 60-th October Anniversary Prospect 7a, Moscow 117312 (Russian Federation); Aynutdinov, V.M., E-mail: aynutdin@yandex.ru [Institute for Nuclear Research, RAS, 60-th October Anniversary Prospect 7a, Moscow 117312 (Russian Federation); Belolaptikov, I.A. [Joint Institute for Nuclear Research, Dubna 141980 (Russian Federation); Bogorodsky, D.Yu. [Irkutsk State University, Irkutsk 664003 (Russian Federation); Brudanin, V.B. [Joint Institute for Nuclear Research, Dubna 141980 (Russian Federation); Budnev, N.M. [Irkutsk State University, Irkutsk 664003 (Russian Federation); Danilchenko, I.A.; Domogatsky, G.V.; Doroshenko, A.A. [Institute for Nuclear Research, RAS, 60-th October Anniversary Prospect 7a, Moscow 117312 (Russian Federation); Dyachok, A.N. [Irkutsk State University, Irkutsk 664003 (Russian Federation); Dzhilkibaev, Zh-A.M. [Institute for Nuclear Research, RAS, 60-th October Anniversary Prospect 7a, Moscow 117312 (Russian Federation); Fialkovsky, S.V. [Nizhny Novgorod State Technical University, Nizhny Novgorod 603950 (Russian Federation); Gaponenko, O.N. [Institute for Nuclear Research, RAS, 60-th October Anniversary Prospect 7a, Moscow 117312 (Russian Federation); Golubkov, K.V. [Joint Institute for Nuclear Research, Dubna 141980 (Russian Federation); Gress, O.A.; Gress, T.I.; Grishin, O.G. [Irkutsk State University, Irkutsk 664003 (Russian Federation); Kebkal, K.G.; Kebkal, O.G. [EvoLogics GmbH, Berlin 13355 (Germany); Klabukov, A.M. [Institute for Nuclear Research, RAS, 60-th October Anniversary Prospect 7a, Moscow 117312 (Russian Federation); and others

    2013-10-11

    We present a status of the Baikal-GVD Project. The objective of this project is a construction of a km3-scale neutrino telescope in the Lake Baikal. As an important milestone, the first GVD engineering array has been deployed and ran in April, 2011. Application of a completely new technology gave us an opportunity to study all the basic elements of the future full detector and to finalize the GVD technical design. We discuss the configuration and the design of the engineering array as well as data performance with the preliminary results.

  12. The cryogenic challenge: status of the KAGRA project

    Science.gov (United States)

    Flaminio, Raffaele; KAGRA Collaboration

    2016-05-01

    The KAGRA project is building a gravitational wave detector inside the Kamioka mine (Japan). The detector is based on a laser interferometer with arms 3 km in length. In addition to its underground location the detector will be characterized by its mirrors made of sapphire and operated at cryogenic temperature. This paper describes the status of the construction at the site and gives an overview of the developments ongoing to prepare the cryogenic operation.

  13. Coal gasification. Quarterly report, July-September 1979

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-07-01

    The status of 18 coal gasification pilot plants or supporting projects supported by US DOE is reviewed under the following headings: company involved, location, contract number, funding, gasification process, history, process description, flowsheet and progress in the July-September 1979 quarter. (LTN)

  14. Coal liquefaction. Quarterly report, July-September 1979

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-07-01

    The status of coal liquefaction pilot plants supported by US DOE is reviewed under the following headings: company involved, location, contract, funding, process name, process description, flowsheet, history and progress during the July-September 1979 quarter. Supporting projects such as test facilities, refining and upgrading coal liquids, catalyst development, and gasification of residues from coal gasification plants are discussed similarly. (LTN)

  15. West Hackberry Tertiary Project. Quarterly technical progress report, September 3, 1993--December 3, 1993

    Energy Technology Data Exchange (ETDEWEB)

    Fassihi, M.R.; Gillham, T.H.

    1993-11-30

    The goal of the West Hackberry Tertiary Project is to demonstrate the technical and economic feasibility combining air injection with the Double Displacement Process for tertiary oil recovery. The Double Displacement Process is the gas displacement of a water invaded oil column for the purpose of recovering oil through gravity drainage. The novel aspect of this project is the use of air as the injection fluid. The target reservoirs for the project are the Camerina C- 1,2,3 Sands located on the west flank of West Hackberry Field in Cameron Parish, Louisiana. If successful, this project win demonstrate that the use of air injection in the Double Displacement Process can economically recover oil in reservoirs where tertiary oil recovery is presently uneconomical.

  16. West Hackberry Tertiary Project. Quarterly technical progress report, March 3, 1993--June 3, 1994

    Energy Technology Data Exchange (ETDEWEB)

    Gillham, T.H.

    1994-09-01

    The goal of the West Hackberry Tertiary Project is to demonstrate the technical and economic feasibility of combining air injection with the Double Displacement Process for tertiary oil recovery. The Double Displacement Process is the gas displacement of a water invaded oil column for the purpose of recovering oil through gravity drainage. The novel aspect of this project is the use of air as the injection fluid. The target reservoir for the project is the Camerina C-1,2,3 Sand located on the West Flank of West Hackberry Field in Cameron Parish, Louisiana. This reservoir has been unitized and is designated as the WH Cam C RI SU. If successful, this project will demonstrate that the use of air injection in the Double Displacement Process can economically recover oil in reservoirs where tertiary oil recovery is presently uneconomic.

  17. Hanford Environmental Dose Reconstruction Project. Quarterly report, June--August 1993

    Energy Technology Data Exchange (ETDEWEB)

    Cannon, S.D.; Finch, S.M. [comps.

    1993-10-01

    The objective of the Hanford Environmental Dose Reconstruction (HEDR) Project is to estimate the radiation doses that individuals and populations could have received from nuclear operations at Hanford since 1944. The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed from release to impact on humans (dose estimates): Source Terms, Environmental Transport, Environmental Monitoring Data, Demography, Food Consumption, and Agriculture, and Environmental Pathways and Dose Estimates.

  18. PENERAPAN SISTEM ERP DALAM MEMBUAT PROJECT FEASIBILITY, PROJECT STATUS DAN PROJECT MONITORING PADA PERUSAHAAN DI BIDANG KONTRAKTOR

    Directory of Open Access Journals (Sweden)

    Hendra Alianto

    2013-11-01

    cost reduction, and improvement of business processes, which will result in an increase in the work (productivity to become more efficient and effective. However, practically some organizations have problems on running ERP system, some even fail. Therefore, a strategy is needed to help the information systems project. Making project feasibility, project status and project monitoring ERP system can be used as a guide in the design of the ERP program applications to become more user-friendly and suitable for the organization needs. The ERP system applied to a contracting company will increase productivity and achieve the level of effectiveness and efficiency of the company's operations. Through strategies in making project feasibility, and status monitoring with ERP system will provide a positive contribution to the development and objectives of the company, so as to improve the effectiveness and efficiency in the processing operations.

  19. Quarterly environmental data summary for first quarter 1999

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-06-01

    In support of the Weldon Spring Site Remedial Action Project Federal Facilities Agreement, a copy of the Quarterly Environmental Data Summary (QEDS) for the first quarter of 1999 is enclosed. The data presented in this constitute the QEDS. The data, except for air monitoring data and site KPA generated data (uranium analyses), were received from the contract laboratories, verified by the Weldon Spring Site verification group and merged into the database during the first quarter of 1999. KPA results for on-site total uranium analyses performed during first quarter 1999 are included. Air monitoring data presented are the most recent complete sets of quarterly data.

  20. Quarterly report for the NGA FFCA project, July 1--September 30, 1994

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-12-31

    Summaries are presented of activities and meetings related to the National Governor`s Association (NGA) Federal Facilities Compliance Act (FFCA) project. The objective of this project is the management of mixed radioactive and hazardous wastes. Activities include: execution of grants to states to fund a review and development of the site treatment plans; determination of interest in a proposed cost model to be developed by EG and G; determination of the major issues that need to be addressed prior to the release of the Draft Site Treatment Plans; and development of a draft Commercial Mixed Waste Issue Paper which was distributed for review and comment.

  1. Basalt waste isolation project. Quarterly report, October 1, 1980-December 31, 1980

    Energy Technology Data Exchange (ETDEWEB)

    Deju, R.A.

    1981-02-01

    In September 1977, the National Waste Terminal Storage Program was restructured to support investigations of two US DOE sites - Hanford and Nevada. The Basalt Waste Isolation Project within Rockwell Hanford Operations has been chartered with the responsibility of conducting these investigations. The overall Basalt Waste Isolation Project is divided into the following principal work areas: systems integration, geosciences, hydrology, engineered barriers, near-surface test facility, engineering testing, and repository studies. Summaries of major accomplishments for each of these areas are reported in this document.

  2. Geothermal direct-heat utilization assistance. Quarterly project progress report, January--March 1996

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-05-01

    This report summarizes geothermal technical assistance, R&D, and technology transfer activities of the Geo-Heat Center. It describes 95 contacts with parties during this period related to technical assistance with goethermal direct heat projects. Areas dealt with include geothermal heat pumps, space heating, greenhouses, aquaculture, equipment, economics, and resources. Research activities are summarized on geothermal district heating system cost evaluation and silica waste utilization project. Outreach activities include publication of a geothermal direct use Bulletin, dissemination of information, goethermal library, technical papers and seminars, and progress monitor reports on geothermal resources and utilization.

  3. Waste Package Project quarterly report, July 1, 1995--September 30, 1995

    Energy Technology Data Exchange (ETDEWEB)

    Ladkany, S.G.

    1995-11-15

    The following tasks are reported: overview and progress of nuclear waste package project and container design; nuclear waste container design considerations; structural investigation of multi purpose nuclear waste package canister; and design requirements of rock tunnel drift for long-term storage of high-level waste (faulted tunnel model study by photoelasticity/finite element analysis).

  4. MHD heat and seed recovery technology project. Tenth quarterly report, April-June 1980

    Energy Technology Data Exchange (ETDEWEB)

    Petrick, M.; Johnson, T. R.

    1980-12-01

    The MHD Heat and Seed Recovery Technology Project at Argonne National Laboratory is obtaining information for the design and operation of the steam plant downstream of the MHD channel-diffuser, and of the seed regeneration process. The project goal is to supply the engineering data required in the design of components for prototype and demonstration MHD facilities. The primary effort of the HSR Technology Project at Argonne is directed toward experimental investigations of critical problem areas, such as (1) corrosion and erosion of refractories and metal alloys; (2) NO/sub x/ behavior in the radiant boiler and secondary combustor; (3) radiant boiler design to meet the multiple requirements of steam generation, NO/sub x/ decomposition, and seed-slag separation; (4) effects of solid or liquid seed deposits on heat transfer and gas flow in the steam and air heaters; (5) formation, growth, and deposition of seed-slag particles; and (6) character of the combustion gas effluents. These investigations are performed primarily in a 2-MW test facility, the Argonne MHD Process Engineering Laboratory (AMPEL). Other project activities are related to studies of the thermochemistry of the seed-slag combustion gas system, and evaluation of seed regeneration processes. Progress is reported.

  5. Minnesota Agri-Power Project. Quarterly report, January--March, 1998

    Energy Technology Data Exchange (ETDEWEB)

    Wilbur, D.

    1998-05-01

    The Minnesota Valley Alfalfa Producers propose to build an alfalfa processing plant integrated with an advanced power plant system at the Granite Falls, Minnesota industrial park to provide 75 MW of base load electric power and a competitively priced source of value added alfalfa based products. This project utilizes air blown fluidized bed gasification technology to process alfalfa stems and another biomass to produce a hot, clean, low heating value gas that will be used in a gas turbine. Exhaust heat from the gas turbine will be used to generate steam to power a steam turbine and provide steam for the processing of the alfalfa leaf into a wide range of products including alfalfa leaf meal, a protein source for livestock. This progress report describes feedstock testing, feedstock supply system, performance guarantees, sales contracts, environmental permits, education, environment, economy, and project coordination and control.

  6. Deflagration-to-detonation transition project. Quarterly report, December 1979-February 1980

    Energy Technology Data Exchange (ETDEWEB)

    Lieberman, M.L. (ed.)

    1980-09-01

    Progress in a project on deflagration-to-detonation transition (DDT) is reported. The activities of this project pertain primarily to the development of small, safe, low-voltage, hot-wire detonators. Its major goals are: the formulation of a modeling capability for DDT of the explosive 2-(5-cyanotetrazolato)pentaamminecobalt (III) perchlorate (CP); the development of improved DDT materials; the establishment of a data base for corrosion, compatibility, and reliability of CP-loaded detonators; and the design and development of advanced DDT components. Information is included on materials development, component development, and compatibility studies encompassing the thermal and chemical stability of CP in contact with the component materials. (LCL)

  7. Geothermal direct-heat utilization assistance. Quarterly project progress report, April--June 1993

    Energy Technology Data Exchange (ETDEWEB)

    Lienau, P.

    1993-06-01

    Technical assistance was provided to 60 requests from 19 states. R&D progress is reported on: evaluation of lineshaft turbine pump problems, geothermal district heating marketing strategy, and greenhouse peaking analysis. Two presentations and one tour were conducted, and three technical papers were prepared. The Geothermal Progress Monitor reported: USGS Forum on Mineral Resources, Renewable Energy Tax Credits Not Working as Congress Intended, Geothermal Industry Tells House Panel, Newberry Pilot Project, and Low-Temperature Geothermal Resources in Nevada.

  8. Status of the AFP project in the ATLAS experiment

    CERN Document Server

    Tasevsky, Marek; The ATLAS collaboration

    2015-01-01

    Status of the AFP project in the ATLAS experiment is summarized. The AFP system is composed of a tracker to detect intact, diffractively scattered protons, and of a time-of-flight detector serving to suppress background from pile-up interactions. The whole system, located around 210~m from the main ATLAS detector, is placed in Roman Pots which move detectors from and to the incident proton beams. A typical distance of the closest approach of the tracker to these beams is 2--3~mm. The main physics motivation lies in measuring diffractive processes in runs with not a very high amount of pile-up.

  9. Status of the AFP project in the ATLAS experiment

    Energy Technology Data Exchange (ETDEWEB)

    Taševský, Marek [Institute of Physics, Academy of Sciences of the Czech Republic, Na Slovance 2, 182 21 Prague (Czech Republic)

    2015-04-10

    Status of the AFP project in the ATLAS experiment is summarized. The AFP system is composed of a tracker to detect intact, diffractively scattered protons, and of a time-of-flight detector serving to suppress background from pile-up interactions. The whole system, located around 210 m from the main ATLAS detector, is placed in Roman Pots which move detectors from and to the incident proton beams. A typical distance of the closest approach of the tracker to these beams is 2–3 mm. The main physics motivation lies in measuring diffractive processes in runs with not a very high amount of pile-up.

  10. Status of the Boeing Dish Engine Critical Component Project

    Energy Technology Data Exchange (ETDEWEB)

    Brau, H.W.; Diver, R.B.; Nelving, H.; Stone, K.W.

    1999-01-08

    The Boeing Company's Dish Engine Critical Component (DECC) project started in April of 1998. It is a continuation of a solar energy program started by McDonnell Douglas (now Boeing) and United Stirling of Sweden in the mid 1980s. The overall objectives, schedule, and status of this project are presented in this paper. The hardware test configuration, hardware background, operation, and test plans are also discussed. A summary is given of the test data, which includes the daily power performance, generated energy, working-gas usage, mirror reflectivity, solar insolation, on-sun track time, generating time, and system availability. The system performance based upon the present test data is compared to test data from the 1984/88 McDonnell Douglas/United Stirling AB/Southem California Edison test program. The test data shows that the present power, energy, and mirror performance is comparable to when the hardware was first manufactured 14 years ago.

  11. Hot gas cleanup test facility for gasification and pressurized combustion project. Quarterly report, October--December 1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-02-01

    The objective of this project is to evaluate hot gas particle control technologies using coal-derived gas streams. This will entail the design, construction, installation, and use of a flexible test facility which can operate under realistic gasification and combustion conditions. The conceptual design of the facility was extended to include a within scope, phased expansion of the existing Hot Gas Cleanup Test Facility Cooperative Agreement to also address systems integration issues of hot particulate removal in advanced coal-based power generation systems. This expansion included the consideration of the following modules at the test facility in addition to the original Transport Reactor gas source and Hot Gas Cleanup Units: Carbonizer/pressurized circulating fluidized bed gas source; hot gas cleanup units to mate to all gas streams; combustion gas turbine; and fuel cell and associated gas treatment. This expansion to the Hot Gas Cleanup Test Facility is herein referred to as the Power Systems Development Facility (PSDF). The major emphasis during this reporting period was continuing the detailed design of the facility towards completion and integrating the balance-of-plant processes and particulate control devices (PCDs) into the structural and process designs. Substantial progress in construction activities was achieved during this quarter.

  12. Healy clean coal project. Quarterly technical progress report No. 16-19, October 1, 1994--September 30, 1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-02-01

    This Quarterly Technical Progress Report is required under U.S. Department of Energy (DOE) Cooperative Agreement, Section XV, {open_quotes}Reporting Requirements{close_quotes} and Attachment C, {open_quotes}Federal Assistance Reporting Checklist{close_quotes}. It covers the period of October 1, 1994 through September 30, 1995. The primary objective of the HCCP is to conduct a cost-sharing project that will demonstrate a new power plant design which features innovative integration of an advanced combustor and heat recovery system coupled with both high and low temperature emission control processes. The parties anticipate that if the demonstration project is successful, the technology could become commercialized in the near term and will be capable of (1) achieving significant reductions in the emissions of sulfur dioxide and the oxides of nitrogen from existing facilities to minimize environmental impacts such as transboundary and interstate pollution and/or (2) providing for future energy needs in an environmentally acceptable manner. The primary equipment elements comprising this new power plant design includes entrained combustion systems coupled with a boiler which will produce low NOx levels, function as a limestone calciner and first stage SO{sub 2} remover in addition to its heat recovery function; a single spray dryer absorber vessel for second stage sulfur removal; a baghouse for third stage sulfur and particulate removal; and a lime activation system which recovers unused reagent from particulate collected in the baghouse. The emission levels Of SO{sub 2}, NOx, and particulate to be demonstrated are expected to be better than the federal New Source Performance Standards (NSPS).

  13. Solar Photovoltaic Project: materials, processes, and testing activities. Quarterly report, 1 January-31 March 1979

    Energy Technology Data Exchange (ETDEWEB)

    Forman, S. E.; Themelis, M. P.

    1979-06-30

    The Department of Energy has set a 20-year-lifetime goal for terrestrial photovoltaic modules. Massachusetts Institute of Technology's Lincoln Laboratory, in its capacity as a Photovoltaic Field Tests and Applications Center, has established throughout the United States various experimental test sites which range in size from 0.1 to 25 kW of peak power. These sites include modules from several manufacturers and serve as test beds for photovoltaic system components. The activities of the Materials, Processes, and Testing Laboratory of the Solar Photovoltaic Project during a three-month (1/1/79-3/31/79) period are summarized. During this period, an inspection trip was made to the Mead, Nebraska, test site. The modules were tested in the field to determine the extent of physical and electrical degradation which had taken place since previous inspections. In addition, several modules were removed from the site for more detailed laboratory examination. The results of both the field testing and laboratory analyses are reported.

  14. Great Basin paleoenvironmental studies project; Technical progress report, second quarter, September--November, 1993

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1993-12-31

    Progress is described in the four tasks associated with this project. Task 1, Paleobotanical studies in the Great Basin, has as its objective the reconstruction of the response of vegetation to climate in order to identify periods of mesic climate at Yucca Mountain during the last 20,000 to 50,000 years. Past extremes in infiltration rates are expected to serve as estimates of climate that may be expected during the next 10,000 years at Yucca Mtn. Task 2, Paleofaunas, will construct a history of Great Basin vertebrates that will provide empirical evidence of past environmental and climatic conditions. The objective of Task 3, Geomorphology, is to document the responses of surficial processes and landforms to the climatic changes documented by studies of packrat middens, pollen, and faunal distributions. The goal of Task 4, Transportation, is to compare the results from three models that have been suggested as appropriate for evaluating flood flows on alluvial fans with the results obtained from the traditional one-dimensional, stochastic model used in previous research for Yucca Mountain. This research looked at three alluvial fans with rail transportation alignments crossing them.

  15. Deflagration-to-detonation transition project: quarterly report for the period September through November 1979

    Energy Technology Data Exchange (ETDEWEB)

    Lieberman, M. L. [ed.

    1980-07-01

    The activities of the Sandia Laboratories project on deflagration-to-detonation transition (DDT) pertain primarily to the development of small, safe, low-voltage, hot-wire detonators. Its major goals are: the formulation of a modeling capability for DDT of the explosive 2-(5-cyanotetrazolato)pentaamminecobalt(III) perchlorate (CP); the development of improved DDT materials; the establishment of a data base for corrosion, compatibility, and reliability of CP-loaded detonators; and the design and development of advanced DDT components. Progress in this research is reported. The planned development of the MC3423 detonator has been completed and the final design review meeting has been held. Additional work must be performed to establish satisfactory output function. Ignition sensitivity data have also been obtained. Ignition and shock testing experiments for development of the MC3533 detonator have been planned. An initial version of the component will utilize available MC3423 headers, while the final design will incorporate a new header that has been designed and ordered. Detonator performance studies have been planned to optimize CP density-length factors. Feasibility studies on the MC3196A detonator have continued in an effort to obtain a reliable 50-200 ..mu..s function time.

  16. Progress and status of cryogenic refrigeration system for project Hydra

    Science.gov (United States)

    Yuan, J.; Catseman, F.; Tilleman, H.; Henderson, N.

    2015-12-01

    In the last two decades, HTS cables have been successfully demonstrated around the world, preparing HTS power cables for a full commercial introduction. Among the demonstration projects, circulating subcooled liquid nitrogen to maintain the HTS cable at operating temperature is a widely adopted approach. In this approach, the cooling systems are absolutely critical to the successful operation of the HTS cables. This paper describes the progress and status of the cryogenic refrigeration system designed and manufactured for project Hydra, which is a project jointly funded by the U.S. Department of Homeland Security Science and Technology Directorate, American Superconductor and Consolidated Edison Company of New York, Inc. American Superconductor is leading the team supported by Con Edison, Ultera, Altran Solutions, and DH Industries. The cable is an inherently fault current limiting HTS cable, approximately 200 m long and designed to carry 96 MVA at a distribution level voltage of 13.8 kV. The cable will be installed and energized near New York City. The refrigeration system was designed and manufactured by DH Industries. This paper provides details on the successful factory acceptance testing completed in November 2014.

  17. Low-Cost Solar-Array Project. Quarterly progress report, April-June 1980

    Energy Technology Data Exchange (ETDEWEB)

    1980-01-01

    The overall objective of the LSA Silicon Material Task is to establish a chemical process for producing silicon at a rate and price commensurate with the production goals of the LSA project for solar-cell modules. As part of the overall Silicon Material Task, Union Carbide developed the silane-silicon process and advanced the technology to the point where it has a definite potential for providing high-purity polysilicon on a commercial scale at a price of $14/kg by 1986 (1980 dollars). This work, completed under Phases I and II of the contract, provided a firm base for the Phase III Program (initiated in April 1979) aimed at establishing the practicality of the process by pursuing the following specific objectives: (1) design, fabricate, install, and operate an Experimental Process System Development Unit (EPSDU) sized for 100 MT/yr to obtain extensive performance data to establish the data base for the design of commercial facilities; (2) perform support research and development to provide an information base usable for the EPSDU and for technological design and economic analysis for potential scale-up of the process; and (3) perform iterative economic analyses of the estimated product cost for the production of semiconductor-grade silicon in a facility capable of producing 1000 MT/yr. This process for preparing semiconductor-grade silicon in the EPSDU from metallurgical-grade (M-G) silicon is based on a well-integrated arrangement of purification steps that provides a cost-effective process system. The three basic steps entail converting M-G silicon to trichlorosilane, redistributing the trichlorosilane to produce silane, and thermally decomposing the silane to form amorphous silicon powder. The powder is then melted and the molten silicon is cast to polycrystalline for subsequent use in fabricating solar cells. Progress is reported in detail. (WHK)

  18. Constellation Program Mission Operations Project Office Status and Support Philosophy

    Science.gov (United States)

    Smith, Ernest; Webb, Dennis

    2007-01-01

    The Constellation Program Mission Operations Project Office (CxP MOP) at Johnson Space Center in Houston Texas is preparing to support the CxP mission operations objectives for the CEV/Orion flights, the Lunar Lander, and and Lunar surface operations. Initially the CEV will provide access to the International Space Station, then progress to the Lunar missions. Initial CEV mission operations support will be conceptually similar to the Apollo missions, and we have set a challenge to support the CEV mission with 50% of the mission operations support currently required for Shuttle missions. Therefore, we are assessing more efficient way to organize the support and new technologies which will enhance our operations support. This paper will address the status of our preparation for these CxP missions, our philosophical approach to CxP operations support, and some of the technologies we are assessing to streamline our mission operations infrastructure.

  19. Radiation protection research projects. Status report 2007; Strahlenschutzforschung. Programmreport 2007

    Energy Technology Data Exchange (ETDEWEB)

    Bernhard-Stroel, Claudia; Goedde, Ralph; Hachenberger, Claudia; Loebke-Reinl, Angelika; Schmitt-Hannig, Annemarie

    2009-01-15

    In Behalf of the German Federal Environment Ministry (BMU) the BfS (Bundesamt fuer Strahlenschutz) assigns research contracts concerning radiation protection topics. The results of these research projects are supposed to provide decision support for the development of radiation protection regulations and other specific radiation protection tasks of the BMU. The BfS is basically charged for the planning, the technical and administrative prearrangements, the assignment, the expert monitoring and the technical evaluation of the results. The report is the compiled information on the results or intermediate results (status reports) of these research projects for the year 2007. [German] Das Bundesamt fuer Strahlenschutz (BfS) vergibt im Auftrag des Bundesministeriums fuer Umwelt, Naturschutz und Reaktorsicherheit (BMU) Forschungsvorhaben auf dem Gebiet des Strahlenschutzes. Die Ergebnisse dieser Vorhaben dienen als Entscheidungshilfen bei der Erarbeitung von Strahlenschutzvorschriften und bei der Erfuellung sonstiger Fachaufgaben des BMU im Bereich Strahlenschutz. Die Planung, fachliche und administrative Vorbereitung, Vergabe, Begleitung sowie die fachliche Bewertung der Ergebnisse der Untersuchungsvorhaben ist grundsaetzlich Aufgabe des Bundesamtes fuer Strahlenschutz. Der vorliegende Bericht informiert ueber die Ergebnisse bzw. Zwischenergebnisse (in Form von Statusberichten) von Strahlenschutzvorhaben des BMU-Ressortforschungsprogramms im Jahr 2007. (orig.)

  20. Health and Maintenance Status Determination and Predictive Fault Diagnosis System Project

    Data.gov (United States)

    National Aeronautics and Space Administration — The objective of this project is to demonstrate intelligent health and maintenance status determination and predictive fault diagnosis techniques for NASA rocket...

  1. Status of U.S. FCEV and Infrastructure Learning Demonstration Project (Presentation)

    Energy Technology Data Exchange (ETDEWEB)

    Wipke, K.; Sprik, S.; Kurtz, J.; Ramsden, T.; Ainscough, C.; Saur, G.

    2011-03-01

    Presented at the Japan Hydrogen and Fuel Cell Demonstration Project (JHFC), 1 March 2011, Tokyo, Japan. This presentation summarizes the status of U.S. fuel cell electric vehicles and infrastructure learning demonstration project.

  2. Quarterly Technical Progress Report

    Energy Technology Data Exchange (ETDEWEB)

    Ayman I. Hawari

    2002-12-30

    This report presents the progress made during the first quarter of phase 2 for the project entitled ''Development and Validation of Thermal Neutron Scattering Laws from Applications and Safety Implications in Generation IV Reactor Designs.'' (B204) THIS IS NOT A FINAL REPORT

  3. Contracts for field projects and supporting research on enhanced oil recovery: Progress review No. 74, Quarter ending March 31, 1993

    Energy Technology Data Exchange (ETDEWEB)

    1994-03-01

    Accomplishments for the past quarter are presented for the following tasks: chemical flooding--supporting research; gas displacement--supporting research; thermal recovery--supporting research; geoscience technology; resource assessment technology; microbial technology; field demonstrations in high-priority reservoir classes; and novel technology. A list of available publication is also provided.

  4. Status Review of Wildlife Mitigation, Columbia Basin Hydroelectric Projects, Washington Facilities (Intrastate) Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Howerton, Jack

    1984-11-01

    This report was prepared for BPA in fulfillment of section 1004 (b)(1) of the Pacific Northwest Electric Power Planning and Conservation Act of 1980, to review the status of past, present, and proposed future wildlife planning and mitigation program at existing hydroelectric projects in the Columbia River Basin. The project evaluations will form the basis for determining any needed remedial measures or additional project analysis. Projects addressed are: Merwin Dam; Swift Project; Yale Project; Cowlitz River; Boundary Dam; Box Canyon Dam; Lake Chelan; Condit Project; Enloe Project; Spokane River; Tumwater and Dryden Dam; Yakima; and Naches Project.

  5. Materials compatibility and lubricants research on CFC-refrigerant substitutes. Quarterly report, October 1, 1995--December 31, 1995

    Energy Technology Data Exchange (ETDEWEB)

    Szymurski, S.R.

    1996-02-01

    The quarterly status report for the Materials Compatibility and Lubricants Research Program is presented. Objectives for 1 October 1995--31 December 1995 include completion of contract negotiations for Study of Foaming Characteristics project, and finalizing Phase IV and Phase V projects.

  6. The QUIJOTE experiment: project status and first scientific results

    Science.gov (United States)

    Rubiño-Martín, J. A.; Génova-Santos, R.; Rebolo, R.; Aguiar, Cózar-Castellano, J. M.; Gómez-Reñasco, F.; Gutiérrez, C.; Hoyland, R. J.; López-Caraballo, C.; Peláez-Santos, A. E.; Pérez-de-Taoro, M. R.; Poidevin, F.; Ruiz-Granados, B.; Sánchez de la Rosa, V.; Tramonte, D.; Vega-Moreno, A.; Viera-Curbelo, T.; Vignaga, R.; Martínez-González, E.; Barreiro, R. B.; Casaponsa, B.; Casas, F. J.; Diego, J. M.; Fernández-Cobos, R.; Herranz, D.; López-Caniego, M.; Ortiz, D.; Vielva, P.; Artal, E.; Aja, B.; Cagigas, J.; Cano, J. L.; de la Fuente, J.; Mediavilla, A.; Terán, J. V.; Villa, E.; Piccirillo, L.; Dickinson, C.; Grainge, K.; Harper, S.; Maffei, B.; McCulloch, M.; Melhuish, S.; Pisano, G.; Watson, R. A.; Lasenby, A.; Ashdown, M.; Perrott, Y.; Razavi-Ghods, N.; Titterington, D.; Scott, P.

    2017-03-01

    We present the current status of the QUIJOTE (Q-U-I JOint TEnerife) experiment, a new polarimeter with the aim of characterizing the polarization of the Cosmic Microwave Background, and other galactic or extra-galactic physical processes that emit in microwaves in the frequency range 10-42 GHz, and at largeangular scales (around 1 degree resolution). The experiment has been designed to reach the required sensitivity to detect a primordial gravitational wave component in the CMB, provided its tensor-to-scalar ratio is larger than r˜0.05. The project consists of two telescopes and three instruments which will survey a large sky area from the Teide Observatory to provide I, Q and U maps of high sensitivity. The first QUIJOTE instrument, known as Multi-Frequency Instrument (MFI), has been surveying the northern sky in four individual frequencies between 10 and 20 GHz since November 2012, providing data with an average sensitivity of 80 μK/beam in Q and U in a region of 20,000 square-degrees. The second instrument, or Thirty-GHz Instrument (TGI), is currently undergoing the commissioning phase, and the third instrument, or Forty-GHz Instrument (FGI), is in the final fabrication phase. Finally, we describe the first scientific results obtained with the MFI. Some specific regions, mainly along the Galactic plane, have been surveyed to a deeper depth, reaching sensitivities of around 40 μK/beam. We present new upper limits on the polarization of the anomalous dust emission, resulting from these data, in the Perseus molecular complex and in the W43 molecular complex.

  7. Hazardous materials in aquatic environments of the Mississippi River Basin Project management. Technical quarterly progress report, April 1, 1996--June 30, 1996

    Energy Technology Data Exchange (ETDEWEB)

    McLachlan, J.; Ide, C.F.; O`Connor, S.

    1996-08-01

    This quarterly report summarizes accomplishments for the Project examining hazardous materials in aquatic environments of the Mississippi River Basin. Among the many research areas summarized are the following: assessment of mechanisms of metal-induced reproductive toxicity in aquatic species as a biomarker of exposure; hazardous wastes in aquatic environment;ecological sentinels of aquatic contamination in the lower Mississippi River System; remediation of selected contaminants; rapid on-site immunassay for heavy metal contamination; molecular mechanisms of developmental toxicity induced by retinoids and retinoid-like molecules; resuseable synthetic membranes for the removal of aromatic and halogenated organic pollutants from waste water; Effects of steroid receptor activation in neurendocrine cell of the mammalian hypothalamus; modeling and assessment of environmental quality of louisiana bayous and swamps; enhancement of environmental education. The report also contains a summary of publications resulting from this project and an appendix with analytical core protocals and target compounds and metals.

  8. Coal combustion science. Quarterly progress report, July--September 1994

    Energy Technology Data Exchange (ETDEWEB)

    Hardesty, D.R. [ed.; Baxter, L.L.; Davis, K.A.; Hurt, R.H.; Yang, N.Y.C.

    1995-09-01

    This document is a quarterly status report of the Coal Combustion Science Project that is being conducted at the Combustion Research Facility, Sandia National Laboratories, Livermore, California. The information reported is for the period July-September 1994. The objective of this work is to support the Office of Fossil Energy in executing research on coal combustion science. This project consists of basic research on coal combustion that supports both the Pittsburgh Energy Technology Center (PETC) Direct Utilization Advanced Research and Technology Development Program, and the International Energy Agency (IEA) Coal Combustion Science Project.

  9. Status Review of Wildlife Mitigation, Columbia Basin Hydroelectric Projects, Columbia River Mainstem Facilities, 1984 Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Howerton, Jack; Hwang, Diana

    1984-11-01

    This report reviews the status of past, present, and proposed future wildlife planning and mitigation programs at existing hydroelectric projects in the Columbia River Basin. The project evaluations will form the basis for determining any needed remedial measures or additional project analysis. Each hydropower facility report is abstracted separately for inclusion in the Energy Data Base.

  10. 78 FR 72109 - Quarterly Status Report of Water Service, Repayment, and Other Water-Related Contract Actions

    Science.gov (United States)

    2013-12-02

    ... form of news releases, legal notices, official letters, memorandums, or other forms of written material... parties who requested the contract in response to the initial public notice. Definitions of Abbreviations... contract to provide for a long term-water supply. 57. Nelson Dikes, Milk River Project: Consideration of...

  11. 78 FR 72111 - Quarterly Status Report of Water Service, Repayment, and Other Water-Related Contract Actions

    Science.gov (United States)

    2013-12-02

    ... in the form of news releases, legal notices, official letters, memorandums, or other forms of written... parties who requested the contract in response to the initial public notice. Definitions of Abbreviations... contract to provide for a long term-water supply. 57. Nelson Dikes, Milk River Project: Consideration of...

  12. Contracts for field projects and supporting research on enhanced oil recovery. Progress review No. 78, quarter ending March 31, 1994

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-05-01

    This report presents descriptions of various research projects and field projects concerned with the enhanced recovery of petroleum. Contract numbers, principal investigators, company names, and project management information is included.

  13. The PEP-II Project: Low-Energy Ring Design and Project Status

    Energy Technology Data Exchange (ETDEWEB)

    Zisman, Michael S.

    2006-01-02

    We describe the present status of the PEP-II project. The project comprises four major systems: Injector, High-Energy Ring (HER), Low-Energy Ring (LER), and Interaction Region (IR). We focus in detail on the design of the LER, as its parameters and requirements are most closely related to those required for the Beijing Tau-Charm Factory rings. The PEP-II LER is a high-current, 3.1-GeV positron ring mounted above the 9-GeV HER. The LER uses a wiggler located in one of its six straight sections to provide emittance control and additional damping. We describe the rather complicated IR, which must transport the LER beam into the plane of the HER, focus it to a common beam size, and separate the beams after the head-on collisions. Both permanent magnet and conventional electromagnets are used in this area. The LER lattice has now adopted a simplified non-interleaved sextupole correction scheme that has reduced the required number of sextupoles substantially. We describe the LER vacuum system, one of the most challenging subsystems in PEP-II. It employs several technologies. In the arcs, aluminum extrusions and titanium sublimation pumps are employed; the straight sections use stainless steel chambers with lumped ion pumps. In the wiggler area, an extended copper photon dump with nonevaporable getter (NEG) pumps is employed to handle the very large synchrotron radiation power. The design of the room-temperature RF system, the bunch-by-bunch longitudinal and transverse feedback systems, and some of the special diagnostics will be described briefly. The PEP-II project remains on schedule to begin commissioning of the HER in April 1997, followed by the LER a year later.

  14. 20 CFR 404.145 - When you acquire a quarter of coverage.

    Science.gov (United States)

    2010-04-01

    ... 20 Employees' Benefits 2 2010-04-01 2010-04-01 false When you acquire a quarter of coverage. 404... DISABILITY INSURANCE (1950- ) Insured Status and Quarters of Coverage Quarters of Coverage § 404.145 When you acquire a quarter of coverage. If we credit you with a quarter of coverage (QC) for a calendar...

  15. 20 CFR 404.140 - What is a quarter of coverage.

    Science.gov (United States)

    2010-04-01

    ... 20 Employees' Benefits 2 2010-04-01 2010-04-01 false What is a quarter of coverage. 404.140... DISABILITY INSURANCE (1950- ) Insured Status and Quarters of Coverage Quarters of Coverage § 404.140 What is a quarter of coverage. (a) General. A quarter of coverage (QC) is the basic unit of social...

  16. Los Alamos National Laboratory Yucca Mountain Site Characterization Project 1994 quality program status report

    Energy Technology Data Exchange (ETDEWEB)

    Bolivar, S.L.

    1996-03-01

    This status report is for calendar year 1994. It summarizes the annual activities and accomplishments of the Los Alamos National Laboratory Yucca Mountain Site Characterization Project (YMP or Project) quality assurance program. By identifying the accomplishments of the quality program, a baseline is established that will assist in decision making, improve administrative controls and predictability, and allow us to annually identify adverse trends and to evaluate improvements. This is the fourth annual status report.

  17. Status of the project of Novosibirsk high power FEL

    Energy Technology Data Exchange (ETDEWEB)

    Pinayev, I.V.; Erg, G.I.; Gavrilov, N.G. [Budker Institute of Nuclear Physics, Novosibirsk (Russian Federation)] [and others

    1995-12-31

    The project of IR FEL for the Siberian Center of photochemical researches is described. The distinguished features of this project are the use of the race-track microtron-recuperator and the {open_quotes}electron output of radiation{close_quotes}. The building for the machine is under reconstruction now. About half of hardware has been manufactured. The assembly of installation began.

  18. SFC status report on major shale oil projects

    Energy Technology Data Exchange (ETDEWEB)

    Zukor, S.H.

    1982-06-01

    The SFC was created by the Energy Security Act on June 30, 1980. Solicitations for financial assistance from the DOE came from Union Oil and the Tosca company, both for projects near Parachute, Colorado. Both projects received DOE assistance. The first SFC solicitations came in 1981. 6 Of 28 solicitations were for shale oil. In January 1983, seven phase I maturity criteria were applied to the projects and the list was reduced to eleven--only one of which was for shale oil. The SFC will now meet to consider which of the eleven projects that met the maturity criteria of Phase I can also meet the six Phase I criteria. Of the shale oil projects that lacked maturity, a brief is included that indicates SFC policy will tradeoff some near-term production for diversity that will enhance long term use.

  19. Scripts liberation of Peasants in Russia in the First Quarter of the XIX-th Century in the Reflection of Rumors, Petitions and Noble Projects

    Directory of Open Access Journals (Sweden)

    Dmitrii V. Timofeev

    2015-09-01

    Full Text Available On the basis of archival materials presents the basic "scenario" emancipation of the serfs in the first quarter of XIX-th century. A comparative analysis of the investigation of cases of dissemination of "unlawful speeches", denunciations, notes and projects identified the following options for addressing the issue of serfdom: the scenario of "external release," "liberation by the initiative of the Russian Emperor" by transferring the peasants on public lands and the payment of money compensation; exemption with the transition to a "new state" scenario "deferred liberation." Comparative analysis of the stories about the role of the state, the rate and conditions of the peasants of freedom, led to the conclusion about the existence in the minds of Russian citizens community paternalistic attitudes. Waiting initiative on the part of the state not only significantly slowed the development process of reform, but also contributed to the formation directly opposite behaviors aimed at the use of forced labor

  20. Equity Oil Company BX in situ oil shale project, Piceance Basin, Colorado. Environmental quarter report, March 1-May 31, 1981

    Energy Technology Data Exchange (ETDEWEB)

    1981-06-12

    This report has been organized into three sections for ease of review. Section A - Air Resources covers data collected by the 100-foot tower between September and December 1980. Section B - Water Resources covers data collected since the last Quarterly Report. Section C - Aquatic Biology covers data collected since January 1981. Laboratory analysis results of all water samples show no significant changes from previous sample have occurred. The alluvial wells did exhibit slightly higher concentrations of phenols. Presently no baseline record exists for these wells to establish the normal levels of phenols in the alluvial ground water. Laboratory analysis of all sampling locations are presented in Appendix B. Aquatic biology covers data collected during the initial two aquatic biology field sampling trips of 1981. Benthic invertebrates, periphyton algae, and a fishery survey was conducted. Stream observations indicate that the stream habitat has remained unchanged since the August 1980 field visit. (ATT)

  1. Status of NINJA: the Numerical INJection Analysis project

    CERN Document Server

    Aylott, Benjamin; Boggs, William D; Boyle, Michael; Brady, Patrick R; Brown, Duncan A; Brügmann, Bernd; Buchman, Luisa T; Buonanno, Alessandra; Cadonati, Laura; Camp, Jordan; Campanelli, Manuela; Centrella, Joan; Chatterjis, Shourov; Christensen, Nelson; Chu, Tony; Diener, Peter; Dorband, Nils; Etienne, Zachariah B; Faber, Joshua; Fairhurst, Stephen; Farr, Benjamin; Fischetti, Sebastian; Guidi, Gianluca; Goggin, Lisa M; Hannam, Mark; Herrmann, Frank; Hinder, Ian; Husa, Sascha; Kalogera, Vicky; Keppel, Drew; Kidder, Lawrence E; Kelly, Bernard J; Krishnan, Badri; Laguna, Pablo; Lousto, Carlos O; Mandel, Ilya; Marronetti, Pedro; Matzner, Richard; McWilliams, Sean T; Matthews, Keith D; Mercer, R Adam; Mohapatra, Satyanarayan R P; Mroué, Abdul H; Nakano, Hiroyuki; Ochsner, Evan; Pan, Yi; Pekowsky, Larne; Pfeiffer, Harald P; Pollney, Denis; Pretorius, Frans; Raymond, Vivien; Reisswig, Christian; Rezzolla, Luciano; Rinne, Oliver; Robinson, Craig; Röver, Christian; Santamaría, Lucía; Sathyaprakash, Bangalore; Scheel, Mark A; Schnetter, Erik; Seiler, Jennifer; Shapiro, Stuart L; Shoemaker, Deirdre; Sperhake, Ulrich; Stroeer, Alexander; Sturani, Riccardo; Tichy, Wolfgang; Liu, Yuk Tung; van der Sluys, Marc; van Meter, James R; Vaulin, Ruslan; Vecchio, Alberto; Veitch, John; Viceré, Andrea; Whelan, John T; Zlochower, Yosef; 10.1088/0264-9381/26/11/114008

    2009-01-01

    The 2008 NRDA conference introduced the Numerical INJection Analysis project (NINJA), a new collaborative effort between the numerical relativity community and the data analysis community. NINJA focuses on modeling and searching for gravitational wave signatures from the coalescence of binary system of compact objects. We review the scope of this collaboration and the components of the first NINJA project, where numerical relativity groups shared waveforms and data analysis teams applied various techniques to detect them when embedded in colored Gaussian noise.

  2. The EEE experiment project: status and first physics results

    Science.gov (United States)

    Abbrescia, M.; Agocs, A.; Aiola, S.; Antolini, R.; Avanzini, C.; Baldini Ferroli, R.; Bencivenni, G.; Bossini, E.; Bressan, E.; Chiavassa, A.; Cicaló, C.; Cifarelli, L.; Coccia, E.; De Gruttola, D.; De Pasquale, S.; Di Giovanni, A.; D'Incecco, M.; Dreucci, M.; Fabbri, F. L.; Frolov, V.; Garbini, M.; Gemme, G.; Gnesi, I.; Gustavino, C.; Hatzifotiadou, D.; La Rocca, P.; Li, S.; Librizzi, F.; Maggiora, A.; Massai, M.; Miozzi, S.; Panareo, M.; Paoletti, R.; Perasso, L.; Pilo, F.; Piragino, G.; Regano, A.; Riggi, F.; Righini, G. C.; Romano, F.; Sartorelli, G.; Scapparone, E.; Scribano, A.; Selvi, M.; Serci, S.; Siddi, E.; Spandre, G.; Squarcia, S.; Taiuti, M.; Toselli, F.; Votano, L.; Williams, M. C. S.; Yánez, G.; Zichichi, A.; Zuyeuski, R.

    2013-06-01

    The Extreme Energy Events Project is an experiment for the detection of Extensive Air Showers which exploits the Multigap Resistive Plate Chamber technology. At the moment 40 EEE muon telescopes, distributed all over the Italian territory, are taking data, allowing the relative analysis to produce the first interesting results, which are reported here. Moreover, this Project has a strong added value thanks to its effectiveness in terms of scientific communication, which derives from the peculiar way it was planned and carried on.

  3. Los Alamos National Laboratory Yucca Mountain Site Characterization Project 1995 quality program status report

    Energy Technology Data Exchange (ETDEWEB)

    Bolivar, S.L.

    1996-07-01

    This status report summarizes the activities and accomplishments of the Los Alamos National Laboratory Yucca Mountain Site Characterization Project`s (YMP`s) quality assurance program for January 1 to September 30, 1995. The report includes major sections on program activities and trend analysis.

  4. Quarterly Report 11 for the Period October 1978 - December 1978 and Proceedings of the 11th Project Integration Meeting

    Energy Technology Data Exchange (ETDEWEB)

    None

    1979-10-01

    This report describes progress made by the Low-Cost Solar Array Project during the period October through December 1978. It includes task reports on silicon material processing, large-area silicon sheet development, encapsulation mate3rials testing and development, Project engineering and operations, and manufacturing techniques, plus the steps taken to integrate these efforts. it also includes a report on and copies of viewgraphs presented at the Project Integration Meeting held December 13-14, 1978.

  5. Contracts for field projects and supporting research on enhanced oil recovery. Progress review number 83, quarter ending June 30, 1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-08-01

    Summaries of 41 research projects on enhanced recovery are presented under the following sections: (1) chemical flooding; (2) gas displacement; (3) thermal recovery; (4) geoscience technology; (5) resource assessment technology; and (6) reservoir classes. Each presentation gives the title of the project, contract number, research facility, contract date, expected completion data, amount of the award, principal investigator, and DOE program manager, and describes the objectives of the project and a summary of the technical progress.

  6. Cogeneration and Small Power Production Quarterly Report to the California Public Utilities Commission Second Quarter 1983

    Energy Technology Data Exchange (ETDEWEB)

    None

    1983-01-01

    In the Second Quarter of 1983, the number of signed contracts and committed projects rose from 223 to 240, with a total estimated nominal capacity of these projects of 1,449 MW. Of this nominal capacity, about 361 MW is operational, and the balance is under contract for development. A map indicating the location of currently operating facilities is provided as Figure A. Of the 240 signed contracts and committed projects, 75 were cogeneration, solid waste, or biomass projects with a potential of 740 MW. PG and E also had under active discussion 32 cogeneration projects that could generate a total of 858 MW to 921 MW, and 10 solid waste/biomass projects with a potential of 113 MW to 121 MW. Two contracts have been signed with geothermal projects, capable of producing 83 MW. There are 6 solar projects with signed contracts and a potential of 36 MW, as well as another solar project under active discussion for 30 MW. Wind farm projects under contract number 19, with a generating capability of 471 MW. Also, discussions are being conducted with 12 wind farm projects, totaling 273 to 278 MW. There are 89 wind projects of 100 kW or less with signed contracts and a potential of almost 1 MW, as well as 10 other projects under active discussion. There are 47 hydroelectric projects with signed contracts and a potential of 110 MW, as well as 65 projects under active discussion for 175 MW. In addition, there are 30 hydroelectric projects, with a nominal capacity of 291 MW, that PG and E is constructing or planning to construct. Table A displays the above information. In tabular form, in Appendix A, are status reports of the projects as of June 30, 1983.

  7. Design status of the Delfi-Next nanosatellite project

    NARCIS (Netherlands)

    Bouwmeester, J.; Brouwer, G.F.; Gill, E.K.A.; Monna, G.L.E.; Rotteveel, J.

    2010-01-01

    Delfi-Next is the second project within the Delfi nanosatellite development program of Delft University of Technology. It will provide students hands-on experience, facilitate technology demonstration for innovative miniaturized space technology from the Dutch space sector and allow advancements in

  8. Design status of the Delfi-Next nanosatellite project

    NARCIS (Netherlands)

    Bouwmeester, J.; Brouwer, G.F.; Gill, E.K.A.; Monna, G.L.E.; Rotteveel, J.

    2010-01-01

    Delfi-Next is the second project within the Delfi nanosatellite development program of Delft University of Technology. It will provide students hands-on experience, facilitate technology demonstration for innovative miniaturized space technology from the Dutch space sector and allow advancements in

  9. Predictive Engineering Tools for Injection-Molded Long-Carbon-Fiber Thermoplastic Composites - FY13 Fourth Quarterly Report

    Energy Technology Data Exchange (ETDEWEB)

    Nguyen, Ba Nghiep; Simmons, Kevin L.

    2013-12-02

    This quarterly report summarizes the status of the project planning to obtain all the approvals required for a Cooperative Research and Development Agreement (CRADA) with Autodesk, Inc., Toyota Motor Engineering and Manufacturing North America (Toyota), and Magna Exterior and Interiors Corporation (Magna). The final CRADA documents processed by PNNL’s Legal Services were submitted to all the parties for signatures.

  10. Predictive Engineering Tools for Injection-Molded Long-Carbon-Fiber Thermoplastic Composites - FY13 Fourth Quarterly Report

    Energy Technology Data Exchange (ETDEWEB)

    Nguyen, Ba Nghiep; Simmons, Kevin L.

    2013-12-02

    This quarterly report summarizes the status of the project planning to obtain all the approvals required for a Cooperative Research and Development Agreement (CRADA) with Autodesk, Inc., Toyota Motor Engineering and Manufacturing North America (Toyota), and Magna Exterior and Interiors Corporation (Magna). The final CRADA documents processed by PNNL’s Legal Services were submitted to all the parties for signatures.

  11. Status and perspectives of the BAIKAL-GVD project

    Directory of Open Access Journals (Sweden)

    Avrorin A.D.

    2016-01-01

    Full Text Available The neutrino telescope Baikal-GVD in Lake Baikal will be a research infrastructure aimed mainly at studying astrophysical neutrino fluxes. The telescope will consist of clusters of strings – functionally independent sub-arrays. The deployment of the first demonstration cluster has been started in April 2013. In 2014 the deployment of the second stage of the demonstration cluster has been performed. We describe the configuration and design of the first GVD cluster and review the current status of cluster deployment in Lake Baikal.

  12. Status of the large high altitude air shower observatory project

    Energy Technology Data Exchange (ETDEWEB)

    Zha, Min, E-mail: zham@ihep.ac.cn [Key Laboratory of Astroparticle and Cosmic Ray, Institute of High Energy Physics, YuQuan Road 19 B, 100049 Beijing (China)

    2012-11-11

    The Large High Altitude Air Shower Observatory (LHAASO) project is a multipurpose project. The main scientific tasks can be summarized as follows: (1) searching for galactic cosmic ray origins through gamma ray source detection above 30 TeV; (2) wide field of view survey for gamma ray sources at energies higher than 100 GeV; (3) energy spectrum measurements for individual cosmic ray species from 30 TeV to 10 PeV. To target above tasks, a complex detector array is designed. This paper describes the progress on the research and development of all kind of detectors. Construction and operation of a prototype detector array at Tibet site with 4300 m a.s.l. are also presented.

  13. NCBI Reference Sequence project: update and current status.

    Science.gov (United States)

    Pruitt, Kim D; Tatusova, Tatiana; Maglott, Donna R

    2003-01-01

    The goal of the NCBI Reference Sequence (RefSeq) project is to provide the single best non-redundant and comprehensive collection of naturally occurring biological molecules, representing the central dogma. Nucleotide and protein sequences are explicitly linked on a residue-by-residue basis in this collection. Ideally all molecule types will be available for each well-studied organism, but the initial database collection pragmatically includes only those molecules and organisms that are most readily identified. Thus different amounts of information are available for different organisms at any given time. Furthermore, for some organisms additional intermediate records are provided when the genome sequence is not yet finished. The collection is supplied by NCBI through three distinct pipelines in addition to collaborations with community groups. The collection is curated on an ongoing basis. Additional information about the NCBI RefSeq project is available at http://www.ncbi.nih.gov/RefSeq/.

  14. Next Generation Nuclear Plant Project 2009 Status Report

    Energy Technology Data Exchange (ETDEWEB)

    Larry Demick; Jim Kinsey; Keith Perry; Dave Petti

    2010-05-01

    The mission of the NGNP Project is to broaden the environmental and economic benefits of nuclear energy technology to the United States and other economies by demonstrating its applicability to market sectors not served by light water reactors (LWRs). Those markets typically use fossil fuels to fulfill their energy needs, and high temperature gas-cooled reactors (HTGRs) like the NGNP can reduce this dependence and the resulting carbon footprint.

  15. Contracts for field projects and supporting research on enhanced oil recovery. Progress review number 86, quarter ending March 31, 1996

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-05-01

    Summaries are presented for 37 enhanced oil recovery contracts being supported by the Department of Energy. The projects are grouped into gas displacement methods, thermal recovery methods, geoscience technology, reservoir characterization, and field demonstrations in high-priority reservoir classes. Each summary includes the objectives of the project and a summary of the technical progress, as well as information on contract dates, size of award, principal investigator, and company or facility doing the research.

  16. Quarterly report of RCRA groundwater monitoring data for period April 1, 1993 through June 30, 1993

    Energy Technology Data Exchange (ETDEWEB)

    Jungers, D.K.

    1993-10-01

    Hanford Site interim-status groundwater monitoring projects are conducted as either background, indicator parameter evaluation, or groundwater quality assessment monitoring programs. This report contains data from Hanford Site groundwater monitoring projects. Westinghouse Hanford Company (WHC) manages the RCRA groundwater monitoring projects for federal facilities on the Hanford Site. Project management, specifying data needs, performing quality control (QC) oversight, managing data, and preparing project sampling schedules are all parts of this responsibility. Pacific Northwest Laboratory (PNL) administers the contract for analytical services and provides groundwater sampling services to WHC for the RCRA groundwater monitoring program. This quarterly report contains data received between May 24 and August 20, 1993, which are the cutoff dates for this reporting period. This report may contain not only data from samples collected during the April through June quarter but also data from earlier sampling events that were not previously reported.

  17. AN INVESTIGATION INTO THE STATUS OF PROJECT MANAGEMENT IN SOUTH AFRICA

    Directory of Open Access Journals (Sweden)

    M-L. Barry

    2012-01-01

    Full Text Available

    ENGLISH ABSTRACT: This research investigated the status of project management in South Africa. A total of 81 respondents participated. It was found that internal stakeholders are more likely to have similar opinions on project success than external stakeholders; and that project managers use optimistic reporting because they do not want to appear to let the project stakeholders down. The top five factors for achieving project success are teamwork, cost management, project planning, scope management, and leadership. The six most important indicators of project success are client/customer satisfaction, project team skill level, senior management buy-in, communication or project reporting, scope management, and on-time project delivery.

    AFRIKAANSE OPSOMMING: HHierdie navorsing ondersoek die status van projekbestuur in Suid-Afrika. Een-en-tagtig respondente het deelgeneem. Dit is bevind dat interne rolspelers meer geneig is om dieselfde opinies te hê oor projeksukses as eksterne rolspelers; en dat projekbestuurders optimisties is in verslaggewing omdat hulle nie die projekrolspelers wil teleurstel nie. Die top vyf faktore om projeksukses te haal is spanwerk, kostebestuur, projekbeplanning, bestekbestuur, en leierskap. Die ses belangrikste indikators van projeksukses is kliënttevredenheid, vaardigheid van die projekspan, inkoop van senior bestuur, kommunikasie of projekverslaggewing, bestekbestuur, en om die projek betyds af te lewer.

  18. Status of the Dark Energy Survey Camera (DECam) Project

    Energy Technology Data Exchange (ETDEWEB)

    Flaugher, Brenna L.; Abbott, Timothy M.C.; Angstadt, Robert; Annis, Jim; Antonik, Michelle, L.; Bailey, Jim; Ballester, Otger.; Bernstein, Joseph P.; Bernstein, Rebbeca; Bonati, Marco; Bremer, Gale; /Fermilab /Cerro-Tololo InterAmerican Obs. /ANL /Texas A-M /Michigan U. /Illinois U., Urbana /Ohio State U. /University Coll. London /LBNL /SLAC /IFAE

    2012-06-29

    The Dark Energy Survey Collaboration has completed construction of the Dark Energy Camera (DECam), a 3 square degree, 570 Megapixel CCD camera which will be mounted on the Blanco 4-meter telescope at CTIO. DECam will be used to perform the 5000 sq. deg. Dark Energy Survey with 30% of the telescope time over a 5 year period. During the remainder of the time, and after the survey, DECam will be available as a community instrument. All components of DECam have been shipped to Chile and post-shipping checkout finished in Jan. 2012. Installation is in progress. A summary of lessons learned and an update of the performance of DECam and the status of the DECam installation and commissioning will be presented.

  19. KM3NeT-ARCA project status and plan

    Directory of Open Access Journals (Sweden)

    Coniglione R.

    2016-01-01

    Full Text Available The KM3NeT Collaboration aims at building a research infrastructure in the depths of the Mediterranean Sea hosting a cubic kilometre neutrino telescope. The KM3NeT/ARCA detector is the ideal instrument to look for high-energy neutrino sources thanks to the latitude of the detector and to the optical characteristics of the sea water. The detector latitude allows for a wide coverage of the observable sky including the region of the Galactic centre and the optical sea water properties allow for the measure of the neutrino direction with excellent angular resolution also for cascade events. The technologically innovative components of the detector and the status of construction will be presented as well as the capability it offers to discover neutrinos.

  20. Status and outlook of the CRYRING@ESR project

    Energy Technology Data Exchange (ETDEWEB)

    Geithner, W., E-mail: w.geithner@gsi.de; Andelkovic, Z.; Beck, D.; Bräuning, H.; Bräuning-Demian, A. [GSI Helmholtzzentrum für Schwerionenforschung (Germany); Danared, H. [European Spallation Source ESS (Sweden); Dimopoulou, C. [GSI Helmholtzzentrum für Schwerionenforschung (Germany); Engström, M. [Fysikum, Stockholm University (Sweden); Fedotova, S.; Gorda, O.; Herfurth, F.; Hess, R. [GSI Helmholtzzentrum für Schwerionenforschung (Germany); Källberg, A. [Fysikum, Stockholm University (Sweden); Kleffner, C.; Kotovskiy, N.; Kraus, I.; Lestinsky, M.; Litvinov, S.; Nolden, F.; Reiter, A. [GSI Helmholtzzentrum für Schwerionenforschung (Germany); and others

    2017-11-15

    Once operational, CRYRING@ESR will store and decelerate ions delivered by the experimental storage ring ESR at energies well below those of ESR. In addition to that, CRYRING@ESR has an electron cooler operating with an ultracold electron beam, allowing to provide cooled ion beams for precision experiments. These ions will be delivered to a broad range of experiments presently in preparation; either in-ring or extracted to a dedicated beamline for experiments. An overview and status report of the installation and commissioning of the CRYRING-@ESR storage ring for highly charged ions at the GSI Helmholtzzentrum für Schwerionenforschung is presented. The installation of this storage ring started in 2014 and was completing end of 2016, when this publication was written.

  1. The E-ELT Project: the Dome design status

    Science.gov (United States)

    Marchiori, G.; de Lorenzi, S.; Busatta, A.

    2010-07-01

    Status of the Feasibility Study of E-ELT, the ESO 42 m Extreme Large Telescope, with emphasis on the Dome architecture and erection. The Dome is a hemispherical shape concept servomechanism 86 m high, with an external diameter of 108 m and a 45 m wide Observing Slit. Such dimensions require the application of big structure technologies (like stadium, hangar etc), in order to comply with manufacturing, transport and assembly constrains. The mentioned technology must be fitted with mechanical and control system constrains required by this kind of servo-system. Mechanisms inside the Dome must be sufficiently light and stiff, and composite materials meet the above mentioned requirements. The management of the whole mass is extremely important for the services and power consumption. This paper describes how the above mentioned problems were handled during the E-ELT Dome Feed study.

  2. TA 55 Reinvestment Project II Phase C Update Project Status May 23, 2017

    Energy Technology Data Exchange (ETDEWEB)

    Giordano, Anthony P. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2017-05-25

    The TA-55 Reinvestment Project (TRP) II Phase C is a critical infrastructure project focused on improving safety and reliability of the Los Alamos National Laboratory (LANL) TA-55 Complex. The Project recapitalizes and revitalizes aging and obsolete facility and safety systems providing a sustainable nuclear facility for National Security Missions.

  3. Status of the ATLAS Forward Physics (AFP) Project

    CERN Document Server

    Chytka, L; The ATLAS collaboration

    2012-01-01

    The ATLAS Forward Physics (AFP) project plans to add a set of detectors --- silicon 3D pixel tracking detectors and QUARTIC time of flight detectors --- in the forward region of the ATLAS experiment at the LHC. The AFP detectors will be placed around 210 m from the interaction point and are meant to detect protons produced at small angles. The detectors are to be housed in the so called Hamburg beam pipe --- a movable beam pipe allowing horizontal movement of the detectors. The AFP is currently under approval with possible installation in 2014/15.

  4. The SuperB factory, physics potential and project status

    Directory of Open Access Journals (Sweden)

    Wiechczynski Jaroslaw

    2012-12-01

    Full Text Available The SuperB project is an international enterprise aiming at the construction of the high-luminosity asymmetric beam energy electron-positron accelerator, which would be located in the area of Rome. It would exploit several novel features allowing to achieve an unprecedented luminosities and to collect almost a hundred times more data than the current generation of ”B factories”. As for the leptonic colliders, it will maintain a clean, low-background experimental environment that is crucial for numerous measurements on the field of high energy physics

  5. Overview and status of the Giant Magellan Telescope Project

    Science.gov (United States)

    McCarthy, Patrick J.; Fanson, James; Bernstein, Rebecca; Ashby, David; Bigelow, Bruce; Boyadjian, Nune; Bouchez, Antonin; Chauvin, Eric; Donoso, Eduardo; Filgueira, Jose; Goodrich, Robert; Groark, Frank; Jacoby, George; Pearce, Eric

    2016-08-01

    The Giant Magellan Telescope Project is in the construction phase. Production of the primary mirror segments is underway with four of the seven required 8.4m mirrors at various stages of completion and materials purchased for segments five and six. Development of the infrastructure at the GMT site at Las Campanas is nearing completion. Power, water, and data connections sufficient to support the construction of the telescope and enclosure are in place and roads to the summit have been widened and graded to support transportation of large and heavy loads. Construction pads for the support buildings have been graded and the construction residence is being installed. A small number of issues need to be resolved before the final design of the telescope structure and enclosure can proceed and the GMT team is collecting the required inputs to the decision making process. Prototyping activities targeted at the active and adaptive optics systems are allowing us to finalize designs before large scale production of components begins. Our technically driven schedule calls for the telescope to be assembled on site in 2022 and to be ready to receive a subset of the primary and secondary mirror optics late in the year. The end date for the project is coupled to the delivery of the final primary mirror segments and the adaptive secondary mirrors that support adaptive optics operations.

  6. DELSY project: status and development Dubna Electron Synchrotron

    CERN Document Server

    Balalykin, N; Bykovsky, V

    2003-01-01

    The DELSY (Dubna Electron Synchrotron) project is under development at the Joint Institute for Nuclear Research. It is based on an acceleration facility donated to the Joint Institute for Nuclear Research by the Institute for Nuclear and High Energy Physics (NIKHEF, Amsterdam). The NIKHEF accelerator facility consists of the linear electron accelerator MEA, which has an electron energy of 700 MeV, and the electron storage ring AmPS, with a maximum energy of 900 MeV and a beam current of 200 mA. There are three phases to the construction of the DELSY facility. Phase I will be accomplished with the construction of a complex of free-electron lasers covering continuously the spectrum from the far infrared down to the ultraviolet (approx 150 nm). Phase II will be accomplished with the commissioning of the storage ring DELSY. Complete commissioning of the DELSY project will take place after finishing Phase III, the construction of an X-ray free-electron laser. This phase is considered as the ultimate goal of the pr...

  7. Present Status of the ILC Project and Development

    Energy Technology Data Exchange (ETDEWEB)

    Ross, M.; /Fermilab; Walker, N.; /DESY; Yamamoto, A.; /KEK, Tsukuba

    2011-09-01

    The Technical Design of the International Linear Collider (ILC) Project will be finished in late 2012. The Technical Design Report (TDR) will include a description of the updated design, with a cost estimate and a project plan, and the results of research and development (R & D) done in support of the ILC. Results from directed ILC R & D are used to reduce the cost and risk associated with the ILC design. We present a summary of key challenges and show how the global R & D effort has addressed them. The most important activity has been in pursuit of very high gradient superconducting RF linac technology. There has been excellent progress toward the goal of practical industrial production of niobium sheet-metal cavities with gradient performance in excess of 35 MV/m. In addition, three purpose-built beam test facilities have been constructed and used to study and demonstrate high current linac performance, electron-cloud beam dynamics and precision beam control. The report also includes a summary of component design studies and conventional facilities cost optimization design studies.

  8. Weight Care Project: Health professionals' attitudes and ability to assess body weight status - Study protocol

    LENUS (Irish Health Repository)

    Moorhead, Anne

    2011-03-31

    Abstract Background Health professionals working in primary care and public health have opportunities to address body weight status issues with their patients through face-to-face contact. The objectives of this all-Ireland project are: 1. to assess the attitudes, current practices\\/behaviours and knowledge of key health professional groups on body weight status; 2. to assess the health professional groups\\' ability to identify body weight status in both adults and children. The health professional groups are: (a) community related public health nurses; (b) school public health nurses; (c) GPs and practice nurses (primary care); and (d) occupational health nurses (workplace) from both Northern Ireland and the Republic of Ireland. Methods\\/Design This all-Ireland multi-disciplinary project follows a mixed methods approach using both quantitative and qualitative methodologies, and consists of four components: 1. Literature review - to explore the role of health professionals in managing obesity through spontaneous intervention in a variety of health promotion settings. 2. Telephone interviews and focus groups - to gain an in-depth insight into the views of health professionals in assessing body weight status. 3. Survey (primarily online but also paper-based) - to determine the attitudes, current practices\\/behaviours and knowledge of health professionals in assessing body weight status. 4. Online evaluation study - an online interactive programme will be developed to assess health professionals\\' ability to identify the body weight status of adults and children. Discussion This project will assess and report the attitudes, current practices\\/behaviours and knowledge of key health professional groups within Northern Ireland and the Republic of Ireland on body weight status, and their ability to identify body weight status in both adults and children. The results of this project will generate recommendations for clinical practice in managing obesity, which may

  9. Weight Care Project: Health professionals' attitudes and ability to assess body weight status - Study protocol

    Directory of Open Access Journals (Sweden)

    Murphy Kathy

    2011-03-01

    Full Text Available Abstract Background Health professionals working in primary care and public health have opportunities to address body weight status issues with their patients through face-to-face contact. The objectives of this all-Ireland project are: 1. to assess the attitudes, current practices/behaviours and knowledge of key health professional groups on body weight status; 2. to assess the health professional groups' ability to identify body weight status in both adults and children. The health professional groups are: (a community related public health nurses; (b school public health nurses; (c GPs and practice nurses (primary care; and (d occupational health nurses (workplace from both Northern Ireland and the Republic of Ireland. Methods/Design This all-Ireland multi-disciplinary project follows a mixed methods approach using both quantitative and qualitative methodologies, and consists of four components: 1. Literature review - to explore the role of health professionals in managing obesity through spontaneous intervention in a variety of health promotion settings. 2. Telephone interviews and focus groups - to gain an in-depth insight into the views of health professionals in assessing body weight status. 3. Survey (primarily online but also paper-based - to determine the attitudes, current practices/behaviours and knowledge of health professionals in assessing body weight status. 4. Online evaluation study - an online interactive programme will be developed to assess health professionals' ability to identify the body weight status of adults and children. Discussion This project will assess and report the attitudes, current practices/behaviours and knowledge of key health professional groups within Northern Ireland and the Republic of Ireland on body weight status, and their ability to identify body weight status in both adults and children. The results of this project will generate recommendations for clinical practice in managing obesity, which may

  10. The Space Optical Clock project: status and perspectives

    Science.gov (United States)

    Schiller, Stephan; Tino, Guglielmo M.; Sterr, Uwe; Lemonde, Pierre; Görlitz, Axel; Salomon, Christophe

    The Space Optical Clocks project aims at operating lattice clocks on the ISS for tests of funda-mental physics and for providing high-accuracy comparisons of future terrestrial optical clocks. A pre-phase-A study (2007-10), funded partially by ESA and DLR, includes the implementa-tion of several optical lattice clock systems using Strontium and Ytterbium as atomic systems and their characterization. Subcomponents of clock demonstrators with the added specification of transportability and using techniques that are suitable for later space use, such as all-solid-state lasers, low power consumption, and compact dimensions, have been developed and are being validated. The talk will give a brief overview over the achieved results and outline future developments.

  11. Quarterly coal report, April--June 1990

    Energy Technology Data Exchange (ETDEWEB)

    1990-11-02

    The Quarterly Coal Report provides comprehensive information about US coal production, exports, imports, receipts, consumption, and stocks to a wide audience, including Congress, Federal and State agencies, the coal industry, and the general public. This issue presents detailed quarterly data for April 1990 through June 1990, aggregated quarterly historical data for 1982 through the second quarter of 1990, and aggregated annual historical data for 1960 through 1989 and projected data for selected years from 1995 through 2010. To provide a complete picture of coal supply and demand in the United States, historical information and forecasts have been integrated in this report. 7 figs., 37 tabs.

  12. University of California, Los Angeles Campus School of Medicine Atomic Energy Project quarterly progress report for period ending March 31, 1952

    Energy Technology Data Exchange (ETDEWEB)

    Warren, S.L.

    1952-04-10

    The fifteenth quarterly report being submitted for Contract No. AT04-1-GEN-12 is issued in accordance with Service Request Number 1 except for the report of the Alamogordo Section, Code 91810, which is submitted in accordance with the provisions of Service Request Number 2. Work is in progress on continuing existing projects. In addition, new projects have been initiated including the Kinetics and Mechanism of Protein Denaturation (10018); The Effect of Irradiation on the Constituents of Embryonic Serum (30033); and The Use of Controlled Atmospheres for Spectrographic Excitation Sources (40053). Many of the Project units are either wholly or partially completed and the following initial reports are available: Identification of Ferritin in Blood of Dogs Subjected to Radiation from an Atomic Detonation (UCLA-180); The Nutritional Value of Intravenous Tapioca Dextrin in Normal and Irradiated Rabbits (UCLA-181); The-Decarboxylation and Reconstitution of Linoleic Acid (UCLA-183); Preparation and Properties of Thymus Nucleic Acid (UCLA-184); The Radiation Chemistry of Cysteine Solutions Part II. (a) The Action of Sulfite on the Irradiated Solutions; (b) The Effect on Cystine (UCLA-185); A Revolving Specimen Stage for the Electron Microscope (UCLA-178); An Automatic Geiger-Mueller Tube Tester (UCLA-186); The Value of Gamma Radiation Dosimetry in Atomic Warfare Including a Discussion of Practical Dosage Ranges (UCLA-187); and A New Plastic Tape Film Badge Holder (UCLA-189). Two additional reports were issued; one by Dr. Wilbur Selle entitled Attempts to Alter the Response to Ionizing Radiations from the School of Medicine, UCLA (UCLA-176), and two, a restricted distribution report from the Alamogordo Section entitled Field Observations and Preliminary Field Data Obtained by the UCLA Survey Group on Operation Jangle, November 1951 (UCLA-182).

  13. The radioactive ion beam project at VECC, Kolkata – A status report

    Indian Academy of Sciences (India)

    Alok Chakrabarti

    2002-12-01

    A project to build an ISOL-post accelerator type of radioactive ion beam (RIB) facility has been undertaken at VECC, Kolkata. The funding for the first phase of the project was approved in August 1997. This phase will be the R&D phase and will be completed by December 2003. The present status of development of the various sub-systems of the RIB facility will be discussed.

  14. The IAOOS arctic network project, status and prospect

    Science.gov (United States)

    Pelon, J.; Provost, C.; Sennechael, N.; Calzas, M.; Blouzon, F.; Gascard, J. C.

    2015-12-01

    It is quite clear that for studying Arctic climate changes, and better understand interacting processes it is essential to follow an integrated approach for observing and modeling the whole Arctic system encompassing the atmosphere, the ocean and sea-ice at once. Due to the difficulties in retrieving key parameters, satellite observations alone are not the right answer. The project we are developing, is an attempt to tackle this challenge by providing and maintaining a new integrated observing network of instrumented buoys over the Arctic Ocean in order to collect simultaneously and in real time information related to the state of the upper Ocean, the lower Atmosphere and the Arctic sea-ice/snow. It is planned to operate several autonomous platforms in a network in the Arctic Ocean for a period of at least 5 years. Each platform is equipped to vertically sense and profile key variables in the ocean, sea-ice and atmosphere using - CTD (conductivity, temperature, depth) vertical profilers sensors collecting ocean temperature and salinity down to 800m depth, - Temperature and heat conductivity in snow and ice from ice-mass-balance systems - Cloud and aerosol lidar profiling of the lower atmosphere - Diffuse and direct solar flux using wide angle radiometer - Meteorological standard parameters at the surface Platforms allow measurements to be transmitted in near real time via Iridium satellites. As they will be drifting, it is planned to replace part of them every year. Major tests were performed deploying progressively fully equipped IAOOS platform at the North Pole in April 2012, 2013 and 2014. These platforms drifted from the North Pole in April to Fram Strait (September, October) providing spring summer and fall field data. Important fieldwork for IAOOS was also taking place within the Norwegian ice camp on board R/V Lance organized by the Norsk Polar Institute from January to June 2015, as part of the Norwegian young ICE (N-ICE 2015) cruise project. These

  15. Status of the ORNL Aerosol Release and Transport Project

    Energy Technology Data Exchange (ETDEWEB)

    Adams, R.E.

    1985-01-01

    The behavior of aerosols assumed to be characteristic of those generated during light water reactor (LWR) accident sequences and released into containment is being studied. Recent activities in the ORNL Aerosol Release and Transport Project include studies of (1) the thermal hydraulic conditions existing during Nuclear Safety Pilot Plant (NSPP) aerosol tests in steam-air environments, (2) the thermal output and aerosol mass generation rates for plasma torch aerosol generators, and (3) the influence of humidity on the shape of agglomerated aerosols of various materials. A new Aerosol-Moisture Interaction Test (AMIT) facility was prepared at the NSPP site to accommodate the aerosol shape studies; several tests with Fe/sub 2/O/sub 3/ aerosol have been conducted. In addition to the above activities a special study was conducted to determine the suitability of the technique of aerosol production by plasma torch under the operating conditions of future tests of the LWR Aerosol Containment Experiments (LACE) at the Hanford Engineering Development Laboratory. 3 refs., 2 figs., 7 tabs.

  16. Background analysis and status of the ANAIS dark matter project

    Energy Technology Data Exchange (ETDEWEB)

    Amaré, J.; Cebrián, S.; Cuesta, C.; García, E.; Ginestra, C.; Martínez, M.; Oliván, M. A.; Ortigoza, Y.; Ortiz de Solórzano, A.; Pobes, C.; Puimedón, J.; Sarsa, M. L.; Villar, J. A.; Villar, P. [Laboratorio de Física Nuclear y Astropartículas, Universidad de Zaragoza, Calle Pedro Cerbuna 12, 50009 Zaragoza (Spain); Laboratorio Subterráneo de Canfranc, Paseo de los Ayerbe s/n, 22880 Canfranc Estación, Huesca (Spain)

    2015-08-17

    ANAIS (Annual modulation with NaI Scintillators) is a project aiming to set up at the new facilities of the Canfranc Underground Laboratory (LSC), a large scale NaI(Tl) experiment in order to explore the DAMA/LIBRA annual modulation positive result using the same target and technique. Two 12.5 kg each NaI(Tl) crystals provided by Alpha Spectra took data at the LSC in the ANAIS-25 set-up. The comparison of the background model for the ANAIS-25 prototypes with the experimental results is presented. ANAIS crystal radiopurity goals have been achieved for {sup 232}Th and {sup 238}U chains, but a {sup 210}Pb contamination out-of-equilibrium was identified, whose origin has been studied. The high light collection efficiency obtained with these prototypes allows to anticipate an energy threshold of the order of 1 keVee. A new detector, with improved performances, was received in March 2015 and very preliminary results are shown.

  17. NREL Solar Radiation Resource Assessment Project: Status and outlook

    Energy Technology Data Exchange (ETDEWEB)

    Renne, D.; Riordan, C.; Maxwell, E.; Stoffel, T.; Marion, B.; Rymes, M.; Wilcox, S.; Myers, D.

    1992-05-01

    This report summarizes the activities and accomplishments of NREL's Solar Radiation Resource Assessment Project during fiscal year 1991. Currently, the primary focus of the SRRAP is to produce a 1961--1990 National Solar Radiation Data Base, providing hourly values of global horizontal, diffuse, and direct normal solar radiation at approximately 250 sites around the United States. Because these solar radiation quantities have been measured intermittently at only about 50 of these sites, models were developed and applied to the majority of the stations to provide estimates of these parameters. Although approximately 93% of the data base consists of modeled data this represents a significant improvement over the SOLMET/ERSATZ 1952--1975 data base. The magnitude and importance of this activity are such that the majority of SRRAP human and financial in many other activities, which are reported here. These include the continued maintenance of a solar radiation monitoring network in the southeast United States at six Historically Black Colleges and Universities (HBCU's), the transfer of solar radiation resource assessment technology through a variety of activities, participation in international programs, and the maintenance and operation of NREL's Solar Radiation Research Laboratory. 17 refs.

  18. Status of the "ETOILE" project for a French hadrontherapy centre.

    Science.gov (United States)

    Bajard, Marcel; De Conto, Jean-Marie; Remillieux, Joseph

    2004-12-01

    It is proposed to build a national centre for light-ion hadrontherapy in France, located in Lyon in the Rhône-Alpes region. Under the auspices of University Claude Bemard Lyon-I and with the support of a research contract between Rhône-Alpes region and the Minister of Research, a design has been elaborated. This paper reviews the medical and technical characteristics of the project, called ETOILE (Espace de Traitement Oncologique par Ions Légers dans le cadre Européen). The research programs associated with ETOILE concern mainly the tracking of moving organs, the design of an in-beam PET detector, the simulation of the interaction of carbon ions with tissues and radiobiological studies on the radiosensitivity and tolerance of normal tissues and on the radioresistance of tumours. The capital cost needed to realize ETOILE is about 90 M Euro. We expect a definitive decision to build ETOILE at the end of 2004. In that case the centre will treat its first patients in 2009. A routine flux of 1000 patients per year will be reached after 3 years with an operation cost of 15 M Euro.

  19. LNG - Status in Denmark. Technology and potential. Project report

    Energy Technology Data Exchange (ETDEWEB)

    Naeslund, M.

    2012-05-15

    The interest for LNG both on a small and a large scale is increasing worldwide. The experiences and knowledge on LNG is limited in Denmark. The Danish gas companies' Technical Management Group (TCG) has asked for a status report including a technology description and an evaluation of the potential in Denmark. A survey of primarily small-scale LNG technology is done in the report. The focus is motivated by the new areas of gas utilisation that become possible with small-scale LNG. Small-scale LNG in this study is defined as LNG stored and used at the application or in an isolated gas grid. The small-scale use of LNG has today an almost negligible share of the total LNG trade but offers interesting new applications for gas utilisation. LNG on a small scale can be used primarily as: 1) Ship fuel. 2) Truck fuel (heavy duty long distance). 3) Individual users not connected to the natural gas grid. 4) Backup for upgraded biogas to individual users and vehicle fleets. 5) Security of supply or supply enhancement of heavily loaded parts of the gas grid. 6) Small-scale storage and/or peak shaving. All but the first topics are natural uses for the current Danish gas distributors. LNG as ship fuel may engage other specialized LNG companies. The report contains a technical description of the parts in primarily small-scale LNG handling and operation. Liquefaction, transport, storage, engine technologies, gas quality and safety aspects related to LNG are covered. There seem to be two more or less separate paths for LNG in Denmark, onshore and off-shore use. These are not, apparently, sharing their experiences and knowledge. Rules and regulations are also different which may create some problems in the interface, for example ship bunkering. Further studies are suggested in the area of gas quality and engine technologies and adaptation of foreign guidelines for small-scale installations to Danish conditions. These guidelines ought to be based on international standards and

  20. Current Status of Japanese Global Precipitation Measurement (GPM) Research Project

    Science.gov (United States)

    Kachi, Misako; Oki, Riko; Kubota, Takuji; Masaki, Takeshi; Kida, Satoshi; Iguchi, Toshio; Nakamura, Kenji; Takayabu, Yukari N.

    2013-04-01

    The Global Precipitation Measurement (GPM) mission is a mission led by the Japan Aerospace Exploration Agency (JAXA) and the National Aeronautics and Space Administration (NASA) under collaboration with many international partners, who will provide constellation of satellites carrying microwave radiometer instruments. The GPM Core Observatory, which carries the Dual-frequency Precipitation Radar (DPR) developed by JAXA and the National Institute of Information and Communications Technology (NICT), and the GPM Microwave Imager (GMI) developed by NASA. The GPM Core Observatory is scheduled to be launched in early 2014. JAXA also provides the Global Change Observation Mission (GCOM) 1st - Water (GCOM-W1) named "SHIZUKU," as one of constellation satellites. The SHIZUKU satellite was launched in 18 May, 2012 from JAXA's Tanegashima Space Center, and public data release of the Advanced Microwave Scanning Radiometer 2 (AMSR2) on board the SHIZUKU satellite was planned that Level 1 products in January 2013, and Level 2 products including precipitation in May 2013. The Japanese GPM research project conducts scientific activities on algorithm development, ground validation, application research including production of research products. In addition, we promote collaboration studies in Japan and Asian countries, and public relations activities to extend potential users of satellite precipitation products. In pre-launch phase, most of our activities are focused on the algorithm development and the ground validation related to the algorithm development. As the GPM standard products, JAXA develops the DPR Level 1 algorithm, and the NASA-JAXA Joint Algorithm Team develops the DPR Level 2 and the DPR-GMI combined Level2 algorithms. JAXA also develops the Global Rainfall Map product as national product to distribute hourly and 0.1-degree horizontal resolution rainfall map. All standard algorithms including Japan-US joint algorithm will be reviewed by the Japan-US Joint

  1. The kinetics of sulfation of calcium oxide. [Quarterly] project status report, March 1, 1990--May 31, 1990

    Energy Technology Data Exchange (ETDEWEB)

    Sarofim, A.F.; Longwell, J.P.

    1990-12-31

    The rate of sulfation of a CaO surface is rapid at first, limited by the intrinsic kinetics, but slows down with increasing conversion as a consequence of the increased resistance to diffusion through the product layer. The objectives of this study are to determine the intrinsic kinetics and the product layer diffusion pate by minimizing the resistances to gas-phase pore diffusion, and eliminating complications due to pore filling. This is achieved by the use of nonporous CaO. A wide range of particle sizes are used to change the relative importance of the regimes in which the intrinsic kinetics and product layer diffusion control. The assumption of constant product layer diffusivity can then be tested and the variables that determine this diffusivity independently studied. Information on product layer diffusion can also be obtained from studies of porous particles after the pore mouths are all plugged and a uniform surface coating is obtained. This information on diffusion rate and intrinsic reactivity can then be combined with a geometrical model to describe the rate of reaction over the entire range of conversions and is particularly useful in treating the effect of particle size on conversion history.

  2. Current status and future tasks of the Sunshine Project. (Development of new energy technology)

    Energy Technology Data Exchange (ETDEWEB)

    Takada, T.

    1983-01-01

    Since its inception in 1974, the Sunshine Project has involved advances in new energy technology in many areas. The present report covers the principal areas of activity in 1980, examining the development status of solar energy, goethermal energy, coal liquefaction and gasification, hydrogen energy, wind power, ocean thermal energy conversion, etc. Future trends and tasks of new energy technology development are discussed. (In Japanese)

  3. Research on the Child Development Project: Current Status and Future Directions.

    Science.gov (United States)

    Battistich, Victor; Solomon, Daniel

    1989-01-01

    Reports on the current status of the Child Development Project (San Ramon, California). States that major concerns focus upon validity of measures and criterion validity. Notes that there are indications that the program is being implemented and children's attitudes are being affected. Predicts additional teacher questionnaire measures and the…

  4. RIKEN radioactive isotope beam factory project – Present status and perspectives

    Indian Academy of Sciences (India)

    H Sakurai

    2010-08-01

    Programs for studying nuclear reactions and structure of exotic nuclei available at the RIKEN radioactive isotope beam factory project are introduced and discussed by demonstrating recent highlights. Special emphasis is given to the present status and future plans of new devices.

  5. Status and Opportunities at Project X: A Multi-MW Facility for Intensity Frontier Research

    CERN Document Server

    Holmes, S D; Kephart, R; Kourbanis, I; Lebedev, V; Mishra, S; Nagaitsev, S; Solyak, N; Tschirhart, R

    2014-01-01

    Project X is a multi-megawatt proton facility being developed to support a world-leading program in Intensity Frontier physics at Fermilab. The facility will support programs in elementary particle and nuclear physics, with the potential for broader applications in materials and energy research. Project X is in the development stage with a R&D program focused on front end and superconducting RF acceleration technologies, and with design concepts for a staged implementation. This paper will review the status of the Project X conceptual development and the associated R&D programs.

  6. Projects at the Western Environmental Technology Office. Quarterly technical progress report, July 1, 1995--September 30, 1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-01-01

    The goal of this project is to demonstrate the technical and economic feasibility of commercializing a biotechnology that uses plants to remediate soils, sediments, surface waters, and groundwaters contaminated by heavy metals and radionuclides. This technology, known as phytoremediation, is particularly suited to remediation of soils or water where low levels of contaminants are widespread. Project objectives are to provide an accurate estimate of the capability and rate of phytoremediation for removal of contaminants of concern from soils and groundwaters at Department of Energy (DOE) sites and to develop data suitable for engineering design and economic feasibility evaluations, including methods for destruction or final disposition of plants containing contaminants of concern. The bioremediation systems being evaluated could be less expensive than soil removal and treatment systems, given the areal extent and topography of sites under consideration and the investment of energy and money in soil-moving and -treating processes. In situ technology may receive regulatory acceptance more easily than ex situ treatments requiring excavation, processing, and replacement of surface soils. In addition, phytoremediation may be viable for cleanup of contaminated waters, either as the primary treatment or the final polishing stage, depending on the contaminant concentrations and process economics considerations.

  7. Quarterly environmental data summary for first quarter 1998

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-05-01

    In support of the Weldon Spring Site Remedial Action Project Federal Facilities Agreement, a copy of the Quarterly Environmental Data Summary (QEDS) for the first quarter of 1998 is enclosed. The data presented in this letter and attachment constitute the QEDS. The data were received from the contract laboratories, verified by the Weldon Spring Site verification group and, except for air monitoring data and site KPA generated data (uranium analyses), merged into the data base during the first quarter of 1998. Air monitoring data presented are the most recent complete sets of quarterly data. Air data are not stored in the data base, and KPA data are not merged into the regular data base. Significant data, defined as data values that have exceeded defined {open_quotes}above normal{close_quotes} Level 2 values, are discussed in this letter for Environmental Monitoring Plan (EMP) generated data only. Above normal Level 2 values are based, in ES&H procedures, on historical high values, DOE Derived Concentration Guides (DCGs), NPDES limits and other guidelines. The procedures also establish actions to be taken in the event that {open_quotes}above normal{close_quotes} data occur. All data received and verified during the first quarter were within a permissible range of variability except for those detailed below. Above normal occurrences are cited for groundwater, air, and NPDES data. There were none for springs or surface water. The following discussion offers a brief summary of the data merged during the first quarter that exceeded the above normal criteria and updates on past reported above normal data. The attached tables present the most recent data for air and the data merged into the data base during the first quarter 1998 for groundwater, NPDES, surface water, and springs. Graphs showing concentrations of selected contaminants of concern at some of the critical locations have also been included in this QEDS. The graphs are discussed in the separate sections.

  8. Quarterly report of RCRA groundwater monitoring data for period January 1, 1993 through March 31, 1993

    Energy Technology Data Exchange (ETDEWEB)

    1993-07-01

    Hanford Site interim-status groundwater monitoring projects are conducted as either background, indicator parameter evaluation, or groundwater quality assessment monitoring programs as defined in the Resource Conservation and Recovery Act of 1976 (RCRA); and Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities, as amended (40 Code of Federal Regulations [CFR] 265). Compliance with the 40 CFR 265 regulations is required by the Washington Administrative Code (WAC) 173-303. This report contains data from Hanford Site groundwater monitoring projects. This quarterly report contains data received between March 8 and May 24, 1993, which are the cutoff dates for this reporting period. This report may contain not only data from the January through March quarter but also data from earlier sampling events that were not previously reported.

  9. Coal demonstration plants. Quarterly report, July-September 1979

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-07-01

    The status of two coal liquefaction demonstration plants and of four coal gasification demonstration plants is reviewed under the following headings: company involved, contract number, funding, process name, process description, flowsheet, schedule, history and progress during the July-September quarter, 1979. Supporting projects in coal feeding systems, valves, grinding equipment, instrumentation, process control and water treatment are discussed in a similar way. Conceptual design work on commercial plants for coal to methanol and for a HYGAS high BTU gas plant were continued. (LTN)

  10. Quarterly environmental data summary for fourth quarter 1997

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-12-31

    The Quarterly Environmental Data Summary (QEDS) for the fourth quarter of 1997 is prepared in support of the Weldon Spring Site Remedial Action Project Federal Facilities Agreement. The data presented constitute the QEDS. The data were received from the contract laboratories, verified by the Weldon Spring Site verification group and, except for air monitoring data and site KPA generated data (uranium analyses), merged into the data base during the fourth quarter of 1997. Air monitoring data presented are the most recent complete sets of quarterly data. Air data are not stored in the data base and KPA data are not merged into the regular data base. Significant data, defined as data values that have exceeded defined ``above normal`` level 2 values, are discussed in this letter for Environmental Monitoring Plan (EMP) generated data only. Above normal level 2 values are based, in ES and H procedures, on historical high values, DOE Derived Concentration Guides (DCGs), NPDES limits and other guidelines. The procedures also establish actions to be taken in response to such data. Data received and verified during the fourth quarter were within a permissible range of variability except for those which are detailed.

  11. AIRLESS, a European project on HVAC systems: Project programme and current status

    NARCIS (Netherlands)

    Bluyssen, P.M.; Björkroth, M.; Müller, B.; Oliveira Fernandes, E. de; Clausen, G.H.; Molina, J.L.; Roulet, C.A.

    1999-01-01

    In the beginning of 1998 a three year European project, AIRLESS, was started to develop strategies, principles and protocols to improve and control the performance of HVAC-systems and its components for incorporation in codes and guidelines. Twelve institutes, universities and companies from seven E

  12. AIRLESS, a European project on HVAC systems: Project programme and current status

    NARCIS (Netherlands)

    Bluyssen, P.M.; Björkroth, M.; Müller, B.; Oliveira Fernandes, E. de; Clausen, G.H.; Molina, J.L.; Roulet, C.A.

    1999-01-01

    In the beginning of 1998 a three year European project, AIRLESS, was started to develop strategies, principles and protocols to improve and control the performance of HVAC-systems and its components for incorporation in codes and guidelines. Twelve institutes, universities and companies from seven

  13. ARPA-E Program: Advanced Management Protection of Energy Storage Devices (AMPED) - Fifth Quarterly Project Report - FY14 Q1

    Energy Technology Data Exchange (ETDEWEB)

    Farmer, Joseph [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2013-12-13

    -discharge cycling at various temperatures, thereby enabling earlier warning of thermal runaway than possible with external sensors. Ultimately, the team plans to extend this work to include: (12) flexible wireless controllers, also using Bluetooth 4.0 standard, essential for balancing large-scale battery packs. LLNL received $925K for this project, and has $191K remaining after accomplishing these objectives.

  14. Status and Future Perspectives of the HIE-Isolde Project at CERN

    CERN Document Server

    Kadi, Y; Blumenfeld, Y; Calatroni, S; Catherall, R; Fraser, M A; Goddard, B; Parchet, D; Siesling, E; Venturini Delsolaro, W; Voulot, D; Williams, L R

    2012-01-01

    The High Intensity and Energy (HIE)-ISOLDE project aims at several important upgrades of the present ISOLDE radioactive beam facility at CERN. The main focus lies in the energy upgrade of the post-accelerated radionuclide beams from 3 MeV/u up to 10 MeV/u through the addition of superconducting cavities. This will open the possibility of many new types of experiments including transfer reactions throughout the nuclear chart. The first stage of this upgrade involves the design, construction, installation and commissioning of two high-β cryomodules downstream of REX-ISOLDE, the existing post-accelerator. Each cryomodule houses five high-β superconducting cavities and one superconducting solenoid. Prototypes of the Nb-sputtered Quarter Wave Resonators (QWRs) cavities for the new superconducting linear accelerator have been manufactured and are undergoing RF cold tests. The project also includes a design study of improved production targets to accommodate to the future increase of proton intensity delivered by ...

  15. Predictive Engineering Tools for Injection-Molded Long-Carbon-Fiber Thermoplastic Composites - Quarterly Report

    Energy Technology Data Exchange (ETDEWEB)

    Nguyen, Ba Nghiep; Simmons, Kevin L.

    2013-04-04

    This quarterly report summarizes the status for the project planning to initiate all the legal and contract documents required for establishing the subcontracts needed and a Cooperative Research and Development Agreement (CRADA) with Autodesk, Inc., Toyota Motor Engineering and Manufacturing North America (Toyota), and Magna Exterior and Interiors Corporation (Magna). During the first quarter (10/1/2012 to 12/31/2012), the statements of work (SOW) for the subcontracts to Purdue University, University of Illinois, and PlastiComp, Inc. were completed. A draft of the CRADA SOW was sent to Autodesk, Toyota, and Magna for technical and legal reviews. PNNL Legal Services contacted project partners’ Legal counterparts for preparing legal documents for the project. A non-disclosure agreement was drafted and sent to all the parties for reviews.

  16. Quarterly report of RCRA groundwater monitoring data for period January 1--March 31, 1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-07-01

    This quarterly report contains data received between January and March 1995, which are the cutoff dates for this reporting period. This report may contain not only data from the January through March quarter, but also data from earlier sampling events that were not previously reported. Nineteen Resource Conservation and Recovery Act of 1976 (RCRA) groundwater monitoring projects are conducted at the Hanford Site. These projects include treatment, storage, and disposal facilities for both solid and liquid waste. The groundwater monitoring programs described in this report comply with the interim-status federal (Title 40 Code of Federal Regulation [CFR] Part 265) and state (Washington Administrative Code [WAC] 173-303-400) regulations. The RCRA projects are monitored under one of three programs: background monitoring, indicator parameter evaluation, or groundwater quality assessment.

  17. Tri-State Synfuels Project Review: Volume 12. Fluor project status. [Proposed Henderson, Kentucky coal to gasoline plant; engineering

    Energy Technology Data Exchange (ETDEWEB)

    1982-06-01

    The purpose of this report is to document and summarize activities associated with Fluor's efforts on the Tri-State Synfuels Project. The proposed facility was to be coal-to-transport fuels facility located in Henderson, Kentucky. Tri-State Synfuels Company was participating in the project as a partner of the US Department of Energy per terms of a Cooperative Agreement resulting from DOE's synfuel's program solicitation. Fluor's initial work plan called for preliminary engineering and procurement services to the point of commitment for construction for a Sasol Fischer-Tropsch plant. Work proceeded as planned until October 1981 when results of alternative coal-to-methanol studies revealed the economic disadvantage of the Synthol design for US markets. A number of alternative process studies followed to determine the best process configuration. In January 1982 Tri-State officially announced a change from Synthol to a Methanol to Gasoline (MTG) design basis. Further evaluation and cost estimates for the MTG facility eventually led to the conclusion that, given the depressed economic outlook for alternative fuels development, the project should be terminated. Official announcement of cancellation was made on April 13, 1982. At the time of project cancellation, Fluor had completed significant portions of the preliminary engineering effort. Included in this report are descriptions and summaries of Fluor's work during this project. In addition location of key project data and materials is identified and status reports for each operation are presented.

  18. 94-1 Research and development project lead laboratory support. Status report, January 1--March 31, 1996

    Energy Technology Data Exchange (ETDEWEB)

    Dinehart, M. [comp.

    1996-09-01

    This document reports status and technical progress for Los Alamos National Laboratories 94-1 Research and Development projects. An introduction to the project structure and an executive summary are included. Projects described include Electrolytic Decontamination, Combustibles, Detox, Sand, Slag, and Crucible, Surveillance, and Core Technology.

  19. Cogeneration and Small Power Production Quarterly Report to the California Public Utilities Commission. Second Quarter 1984

    Energy Technology Data Exchange (ETDEWEB)

    None

    1984-01-01

    At the end of the Second Quarter of 1984, the number of signed contracts and letter agreements for cogeneration and small power production projects was 334, with total estimated nominal capacity of 2,876 MW. Of these totals, 232 projects, capable of producing 678 MW, are operational (Table A). A map indicating the location of operational facilities under contract with PG and E is provided as Figure A. Developers of cogeneration projects had signed 80 contracts with a potential of 1,161 MW. Thirty-three contracts had been signed for solid waste/biomass projects for a total of 298 MW. In total, 118 contracts and letter agreements had been signed with cogeneration, solid waste, and biomass projects capable of producing 1,545 MW. PG and E also had under active discussion 46 cogeneration projects that could generate a total of 688 MW to 770 MW, and 13 solid waste or biomass projects with a potential of 119 MW to 139 MW. One contract had been signed for a geothermal project, capable of producing 80 MW. Two geothermal projects were under active discussion for a total of 2 MW. There were 8 solar projects with signed contracts and a potential of 37 MW, as well as 4 solar projects under active discussion for 31 MW. Wind farm projects under contract numbered 34, with a generating capability of 1,042 MW, Also, discussions were being conducted with 23 wind farm projects, totaling 597 MW. There were 100 wind projects of 100 kW or less with signed contracts and a potential of 1 MW, as well as 7 other small wind projects under active discussion. There were 71 hydroelectric projects with signed contracts and a potential of 151 MW, as well as 76 projects under active discussion for 505 MW. In addition, there were 18 hydroelectric projects, with a nominal capacity of 193 MW, that PG and E was planning to construct. Table B displays the above information. Appendix A displays in tabular form the status reports of the projects as of June 30, 1984.

  20. Technical assistance for Meharry Medical College Energy Efficiency Project. Final project status and technical report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-05-08

    This report presents the results of a program to provide technical assistance to Meharry Medical College. The purpose of the program is to facilitate Meharry`s effort to finance a campus-wide facility retrofit. The US Department of Energy (USDOE) funded the program through a grant to the Tennessee Department of Economic and Community Development (TECD). The University of Memphis-Technology and Energy Services (UM-TES), under contract to TECD, performed program services. The report has three sections: (1) introduction; (2) project definition, financing, and participants; and (3) opportunities for federal participation.

  1. FY 1991 environmental research programs for the DOE Field Office, Nevada: Work plan and quarterly reports, fourth quarter report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1991-10-01

    This research includes a wide range of research and support activities associated with the Weapons Testing Program conducted at the Nevada Test Site (NTS). Ongoing and new environmental research programs to be conducted by DRI over the period of this contract include archaeological studies, site mitigation plans, compliance activities, and historical research; offsite community radiation monitoring support; environmental compliance activities related to state and federal regulations; hydrologic assessment of containment of underground nuclear detonations; hydrology/radionuclide investigations designed to better understand and predict the possible subsurface movement of radionuclides at the NTS; and support of various statistical and data management and design, laboratory, field, and administrative activities. In addition to these, archaeological site characterization, flood hazards for rail transportation, and paleofaunal investigations will be carried out in support of the Yucca Mountain Project. Other areas of the overall program which required DRI support are classified security activities, radiation safety and training, quality assurance and control, computer protection and historical data management, review and classification of DRI documents, and preparation of any special reports, e.g., quarterly reports, not included in the requirements of the individual projects. A new set of programs funded by the Office of Technology Development will be in place by the third quarter of FY 1991. These projects will address environmental restoration and waste management concerns, among other related topics. In accordance with specific contract requirements for each activity, DRI will produce summary, status and final reports and, in some cases, journal articles which will present the results of specific research efforts. This document contains the work plan, including project descriptions, tasks, deliverables and quarterly progress reports on each project for FY 1991.

  2. Cogeneration and Small Power Production Quarterly Report to the California Public Utilities Commission First Quarter - March 1983

    Energy Technology Data Exchange (ETDEWEB)

    None

    1983-03-01

    In the First Quarter of 1983, the number of signed contracts and committed projects rose from 204 to 224, with a total estimated nominal capacity of these projects of 1,246 MW. Of this nominal capacity, about 259 MW is operational, and the balance is under contract for development. Of the 224 signed contracts and committed projects, 70 were cogeneration and solid waste/biomass projects with a potential of 687 MW. PG and E also had under active discussion 30 cogeneration projects that could generate a total of 744 MW to 821 MW, and 12 solid waste/biomass projects with a potential of 118 MW to 126 MW. Two contracts have been signed with geothermal projects, capable of producing 83 MW. There are 6 solar projects with signed contracts and a potential of 36 MW, as well as another solar project under active discussion for 30 MW. Wind farm projects under contract number 17, with a generating capability of 330 MW. Also, discussions are being conducted with 9 wind farm projects, totaling 184 to 189 MW. There are 89 wind projects of 100 kW or less with signed contracts and a potential of almost 1 MW, as well as 9 other projects under active discussion. There are 38 hydroelectric projects with signed contracts and a potential of 103 MW, as well as 65 projects under active discussion for 183 MW. In addition, there are 29 hydroelectric projects, with a nominal capacity of 291 MW, that PG and E is constructing or planning to construct. Table A displays the above information. In tabular form, in Appendix A, are status reports of the projects as of March 31, 1983.

  3. Genome Radio Project: Quarterly report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-12-01

    The DNA Files is now in the production phase. The managing editor, program producers, editors, technical director, research and mixing engineers are in place. All-day meetings were held November 20 through 23 between the producers and core production staff, along with several science advisors, for a combination ``teach-in``, discussion group and planning/formatting session. During this time, roles were refined and the support system provided for the producers. The meetings were organized to maximize interaction with the experts, so that producers` questions stemming from the reading they had already done could be addressed.

  4. 94-1 Research and development project lead laboratory support. Status report, July 1, 1996--September 30, 1996

    Energy Technology Data Exchange (ETDEWEB)

    Rink, N. [comp.

    1997-03-01

    This document reports status and technical progress for Los Alamos 94-1 Research and Development projects. Updated schedule charts are shown in the appendix. This is the fourth status report published for Los Alamos National Laboratory 94-1 Research and Development Project Support. The Department of Energy Office of Environmental Management (DOE/EM) funds these projects in order to support the storage or disposal of legacy plutonium and plutonium-bearing materials resulting from weapons production throughout the DOE complex. This document also serves as an end-for-year review of projects and positions the program for FY97.

  5. Technology status in support of refined technical baseline for the Spent Nuclear Fuel project. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Puigh, R.J.; Toffer, H.; Heard, F.J.; Irvin, J.J.; Cooper, T.D.

    1995-10-20

    The Spent Nuclear Fuel Project (SNFP) has undertaken technology acquisition activities focused on supporting the technical basis for the removal of the N Reactor fuel from the K Basins to an interim storage facility. The purpose of these technology acquisition activities has been to identify technology issues impacting design or safety approval, to establish the strategy for obtaining the necessary information through either existing project activities, or the assignment of new work. A set of specific path options has been identified for each major action proposed for placing the N Reactor fuel into a ``stabilized`` form for interim storage as part of this refined technical basis. This report summarizes the status of technology information acquisition as it relates to key decisions impacting the selection of specific path options. The following specific categories were chosen to characterize and partition the technology information status: hydride issues and ignition, corrosion, hydrogen generation, drying and conditioning, thermal performance, criticality and materials accountability, canister/fuel particulate behavior, and MCO integrity. This report represents a preliminary assessment of the technology information supporting the SNFP. As our understanding of the N Reactor fuel performance develops the technology information supporting the SNFP will be updated and documented in later revisions to this report. Revision 1 represents the incorporation of peer review comments into the original document. The substantive evolution in our understanding of the technical status for the SNFP (except section 3) since July 1995 have not been incorporated into this revision.

  6. National Status and Trends, Benthic Surveillance Project Sites, 1984-1992, National Centers for Coastal Ocean Science

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — This data set reports information regarding the nominal sampling locations for the National Status and Trends Benthic Surveillance Project sites. One record is...

  7. National Status and Trends, Benthic Surveillance Project Chemistry Data, 1984-1992, National Centers for Coastal Ocean Science

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The National Status and Trends (NSandT) Benthic Surveillance Project Chemistry data file reports the trace concentrations of a suite of chemical contaminants in...

  8. National Status and Trends, Benthic Surveillance Project Chemistry Data, 1984-1992, National Centers for Coastal Ocean Science

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The National Status and Trends (NS&T) Benthic Surveillance Project Chemistry data file reports the trace concentrations of a suite of chemical contaminants in...

  9. National Status and Trends, Benthic Surveillance Project Sites, 1984-1992, National Centers for Coastal Ocean Science

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — This data set reports information regarding the nominal sampling locations for the National Status and Trends Benthic Surveillance Project sites. One record is...

  10. Contracts for field projects and supporting research on enhanced oil recovery, October--December 1992. Progress review No. 73, quarter ending December 31, 1992

    Energy Technology Data Exchange (ETDEWEB)

    1993-12-01

    Accomplishments for this quarter ending December 31, 1992 are presented for the following tasks: chemical flooding--supporting research; gas displacement--supporting research; thermal recovery--supporting research; geoscience technology; resource assessment technology; microbial technology; reservoir classes; and novel technology.

  11. Contracts for field projects and supporting research on enhanced oil recovery, July--September 1992. Progress review No. 72, quarter ending September 30, 1992

    Energy Technology Data Exchange (ETDEWEB)

    1993-09-01

    Accomplishments for the past quarter are presented for the following tasks: Chemical flooding--supporting research; gas displacement--supporting research; thermal recovery--supporting research; geoscience technology; resource assessment technology; microbial technology; and novel technology. A list of available publication is also provided.

  12. Contracts for field projects and supporting research on enhanced oil recovery. Progress review No. 80. Quarterly report, July--September, 1994

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-11-01

    This report contains information on petroleum enhanced recovery projects. In addition to project descriptions, contract numbers, principal investigators and project management information is included.

  13. Autonomous Precision Landing and Hazard Avoidance Technology (ALHAT) Project Status as of May 2010

    Science.gov (United States)

    Striepe, Scott A.; Epp, Chirold D.; Robertson, Edward A.

    2010-01-01

    This paper includes the current status of NASA s Autonomous precision Landing and Hazard Avoidance Technology (ALHAT) Project. The ALHAT team has completed several flight tests and two major design analysis cycles. These tests and analyses examine terrain relative navigation sensors, hazard detection and avoidance sensors and algorithms, and hazard relative navigation algorithms, and the guidance and navigation system using these ALHAT functions. The next flight test is scheduled for July 2010. The paper contains results from completed flight tests and analysis cycles. ALHAT system status, upcoming tests and analyses is also addressed. The current ALHAT plans as of May 2010 are discussed. Application of the ALHAT system to landing on bodies other than the Moon is included

  14. Current status of the international DECOVALEX project: thermal-hydraulic-mechanical couplings

    Energy Technology Data Exchange (ETDEWEB)

    Kang, C. H.; Hwang, Y. S.; Kim, J

    1998-01-01

    THM coupling is an important issue to assess the safety of the HLW repositories. In this art report the current status of the international DECOVALEX project was reviewed to understand the most updated R and D direction on the groundwater flow assessment coupled with the decay heat and mechanical stress around a repository. Important progresses of DECOVALEX I, II, III and 2 were studied. Results show that even though there are good agreements on the predictions of stress and temperature, still the prediction of flow in discrete fracture network is incomplete. (author). 21 refs., 28 tabs., 33 figs

  15. Present status of spallation target development. JAERI/KEK Joint Project

    Energy Technology Data Exchange (ETDEWEB)

    Hino, R.; Kaminaga, M.; Haga, K. [Japan Atomic Energy Research Inst., Tokai, Ibaraki (Japan). Tokai Research Establishment] [and others

    2001-03-01

    The Japan Atomic Energy Research Institute (JAERI) and the High Energy Accelerator Research Organization (KEK) are promoting a plan to construct a neutron scattering facility under the JAERI/KEK Joint Project. Design and R and D works are being carried out vigorously for realizing the mercury target system consisting of the mercury target, moderators and reflectors working as a spallation neutron source, as well as a remote handling system for exchanging such components which will be highly irradiated. This report introduces an outline of the present status of design and development activities on the spallation target system. (author)

  16. LOFAR: A new radio telescope for low frequency radio observations: Science and project status

    CERN Document Server

    Röttgering, H J A; Fender, R P; Kuijpers, J; Van Haarlem, M P; Johnston-Hollitt, M; Miley, G K

    2003-01-01

    LOFAR, the Low Frequency Array, is a large radio telescope consisting about 100 soccer field sized antenna stations spread over a region of 400 km in diameter. It will operate in the frequency range from ~10 to 240 MHz, with a resolution at 240 MHz of better than an arcsecond. Its superb sensitivity will allow for a broad range of astrophysical studies. In this contribution we first discuss four major areas of astrophysical research in which LOFAR will undoubtedly make important contributions: reionisation, distant galaxies and AGNs, transient radio sources and cosmic rays. Subsequently, we will discuss the technical concept of the instrument and the status of the LOFAR project

  17. Implementation status of the extreme light infrastructure - nuclear physics (ELI-NP) project

    Energy Technology Data Exchange (ETDEWEB)

    Gales, S., E-mail: sydney.gales@eli-np.ro; Zamfir, N. V., E-mail: sydney.gales@eli-np.ro [ELI-NP, Horia Hulubei National Institute for Physics and Nuclear Engineering, 30 Reactorului Street, RO-077125 Bucharest-Magurele (Romania)

    2015-02-24

    The Project Extreme Light Infrastructure (ELI) is part of the European Strategic Forum for Research Infrastructures (ESFRI) Roadmap. ELI will be built as a network of three complementary pillars at the frontier of laser technologies. The ELI-NP pillar (NP for Nuclear Physics) is under construction near Bucharest (Romania) and will develop a scientific program using two 10 PW lasers and a Compton back-scattering high-brilliance and intense gamma beam, a marriage of laser and accelerator technology at the frontier of knowledge. In the present paper, the technical description of the facility, the present status of the project as well as the science, applications and future perspectives will be discussed.

  18. Residual stress diffractometer KOWARI at the Australian research reactor OPAL: Status of the project

    Science.gov (United States)

    Brule, Alain; Kirstein, Oliver

    2006-11-01

    Neutron scattering using diffraction techniques is now recognized as the most precise and reliable method of mapping sub-surface residual stresses in materials or even components, which are not only of academic but also of industrial-economic relevance. The great potential of neutrons in the field of residual stresses was recognized by ANSTO and its external Beam Instrument Advisory Group for the new research reactor OPAL. The recommendation was to build the dedicated strain scanner KOWARI among the first suite of instruments available to users. We give an update on the overall project and present the current status of the diffractometer. It is anticipated that the instrument will be commissioned in mid 2006 and available to users at the end of the OPAL project.

  19. Status of the Short-Pulse X-ray Project at the Advanced Photon Source

    Energy Technology Data Exchange (ETDEWEB)

    Nassiri, A; Berenc, T G; Borland, M; Brajuskovic, B; Bromberek, D J; Carwardine, J; Decker, G; Emery, L; Fuerst, J D; Grelick, A E; Horan, D; Kaluzny, J; Lenkszus, F; Lill, R M; Liu, J; Ma, H; Sajaev, V; Smith, T L; Stillwell, B K; Waldschmidt, G J; Wu, G; Yang, B X; Yang, Y; Zholents, A; Byrd, J M; Doolittle, L R; Huang, G; Cheng, G; Ciovati, G; Dhakal, P; Eremeev, G V; Feingold, J J; Geng, R L; Henry, J; Kneisel, P; Macha, K; Mammosser, J D; Matalevich, J; Palczewski, A D; Rimmer, R A; Wang, H; Wilson, K M; Wiseman, M; Li, Z

    2012-07-01

    The Advanced Photon Source Upgrade (APS-U) Project at Argonne will include generation of short-pulse x-rays based on Zholents deflecting cavity scheme. We have chosen superconducting (SC) cavities in order to have a continuous train of crabbed bunches and flexibility of operating modes. In collaboration with Jefferson Laboratory, we are prototyping and testing a number of single-cell deflecting cavities and associated auxiliary systems with promising initial results. In collaboration with Lawrence Berkeley National Laboratory, we are working to develop state-of-the-art timing, synchronization, and differential rf phase stability systems that are required for SPX. Collaboration with Advanced Computations Department at Stanford Linear Accelerator Center is looking into simulations of complex, multi-cavity geometries with lower- and higher-order modes waveguide dampers using ACE3P. This contribution provides the current R&D status of the SPX project.

  20. Predictive Engineering Tools for Injection-Molded Long-Carbon-Fiber Thermoplastic Composites - FY13 Third Quarterly Report

    Energy Technology Data Exchange (ETDEWEB)

    Nguyen, Ba Nghiep; Simmons, Kevin L.

    2013-08-06

    This quarterly report summarizes the status for the project planning to obtain all the approvals required for a Cooperative Research and Development Agreement (CRADA) with Autodesk, Inc., Toyota Motor Engineering and Manufacturing North America (Toyota), and Magna Exterior and Interiors Corporation (Magna). The CRADA documents have been processed by PNNL Legal Services that is also coordinating the revision effort with the industrial parties to address DOE’s comments.

  1. Predictive Engineering Tools for Injection-Molded Long-Carbon-Fiber Thermoplastic Composites - FY13 Third Quarterly Report

    Energy Technology Data Exchange (ETDEWEB)

    Nguyen, Ba Nghiep; Simmons, Kevin L.

    2013-08-06

    This quarterly report summarizes the status for the project planning to obtain all the approvals required for a Cooperative Research and Development Agreement (CRADA) with Autodesk, Inc., Toyota Motor Engineering and Manufacturing North America (Toyota), and Magna Exterior and Interiors Corporation (Magna). The CRADA documents have been processed by PNNL Legal Services that is also coordinating the revision effort with the industrial parties to address DOE’s comments.

  2. "The Career Development Quarterly": A Centennial Retrospective

    Science.gov (United States)

    Savickas, Mark L.; Pope, Mark; Niles, Spencer G.

    2011-01-01

    "The Career Development Quarterly" has been the premier journal in the field of vocational guidance and career intervention since its inception 100 years ago. To celebrate its centennial, 3 former editors trace its evolution from a modest and occasional newsletter to its current status as a major professional journal. They recount its history of…

  3. "The Career Development Quarterly": A Centennial Retrospective

    Science.gov (United States)

    Savickas, Mark L.; Pope, Mark; Niles, Spencer G.

    2011-01-01

    "The Career Development Quarterly" has been the premier journal in the field of vocational guidance and career intervention since its inception 100 years ago. To celebrate its centennial, 3 former editors trace its evolution from a modest and occasional newsletter to its current status as a major professional journal. They recount its history of…

  4. Quarterly report of RCRA groundwater monitoring data for period October 1, 1993--December 31, 1993

    Energy Technology Data Exchange (ETDEWEB)

    Jungers, D.K.

    1994-04-01

    Hanford Site interim-status groundwater monitoring projects are conducted as either background, indicator parameter evaluation, or groundwater quality assessment monitoring programs as defined in the Resource Conservation and Recovery Act of 1976 (RCRA); and Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities, as amended (40 Code of Federal Regulations [CFR] 265). Compliance with the 40 CFR 265 regulations is required by the Washington Administrative Code (WAC) 173-303. This report contains data from Hanford Site groundwater monitoring projects. Westinghouse Hanford Company (WHC) manages the RCRA groundwater monitoring projects for federal facilities on the Hanford Site. Project management, specifying data needs, performing quality control (QC) oversight, managing data, and preparing project sampling schedules are all parts of this responsibility. Pacific Northwest Laboratory (PNL) administers the contract for analytical services and provides groundwater sampling services to WHC for the RCRA groundwater monitoring program. This quarterly report contains data received between November 20 and February 25, 1994, which are the cutoff dates for this reporting period. This report may contain not only data from the October through December quarter but also data from earlier sampling events that were not previously reported.

  5. Natural Gas Imports and Exports. Third Quarter Report 1999

    Energy Technology Data Exchange (ETDEWEB)

    none

    1999-10-01

    The second quarter 1997 Quarterly Report of Natural Gas Imports and Exports featured a Quarterly Focus report on cross-border natural gas trade between the United States and Mexico. This Quarterly Focus article is a follow-up to the 1997 report. This report revisits and updates the status of some of the pipeline projects discussed in 1997, and examines a number of other planned cross-border pipeline facilities which were proposed subsequent to our 1997 report. A few of the existing and proposed pipelines are bidirectional and thus have the capability of serving either Mexico, or the United States, depending on market conditions and gas supply availability. These new projects, if completed, would greatly enhance the pipeline infrastructure on the U.S.-Mexico border and would increase gas pipeline throughput capacity for cross-border trade by more than 1 billion cubic feet (Bcf) per day. The Quarterly Focus is comprised of five sections. Section I includes the introduction as well as a brief historic overview of U.S./Mexican natural gas trade; a discussion of Mexico's energy regulatory structure; and a review of trade agreements and a 1992 legislative change which allows for her cross-border gas trade in North America. Section II looks at initiatives that have been taken by the Mexican Government since 1995to open its energy markets to greater competition and privatization. Section III reviews Mexican gas demand forecasts and looks at future opportunities for U.S. gas producers to supplement Mexico's indigenous supplies in order to meet the anticipated rapid growth in demand. Section IV examines the U.S.-Mexico natural gas trade in recent years. It also looks specifically at monthly import and export volumes and prices and identifies short-term trends in this trade. Finally, Section V reviews the existing and planned cross-border gas pipeline infrastructure. The section also specifically describes six planned pipelines intended to expand this pipeline

  6. Social status of rural women in the focus of a developmental project

    Directory of Open Access Journals (Sweden)

    Stjepanović-Zaharijevski Dragana

    2006-01-01

    Full Text Available One of the goals of the project called "The milky river", which deals with the integral development of the dairy production, is to initiate the development of the sustainable and profitable production of milk and dairy products through grouping producers and supporting their position in the society they live in. Women are more than men engaged in the dairy production chain and they have a direct view of the whole dairy production process. So it was necessary to adapt the grouping to their needs, as well as to make some practical mechanisms of their involvement in the project activities. In this way, the strategy of the project helped with offering equal chances to women and men, and by reducing the gender inequality, it also helped with making a chance for a new life perspective for women. Through interviews and by focus-grouping the data were collected which represented the first picture of the dairy production in the region of Niš, including its gender characteristics, among other things. Two years later, the qualitative analysis of the indicators of the rural women’s social status in this region in the context of the realization of the project activities, has shown that there has been an important movement forward towards the gender equality which can be attributed to the successful project implementation. Women, as an important factor in the dairy production chain, seem to be joined and encouraged. They seem to be empowered at the level of their knowledge decision making and autonomous activity taking through various forms of education, joint farmer group work, as well as through various forms of cooperation with supporting institutions and other partners within the project activity framework. The overwhelming impression seems to be that joint work and cooperation are necessary conditions for the development of any individual farmers’ production, as well as for the referent rural development which requires the support of all the

  7. Los Alamos National Laboratory Yucca Mountain Site Characterization Project 1992 quality program status report

    Energy Technology Data Exchange (ETDEWEB)

    Bolivar, S.L.; Burningham, A.; Chavez, P. [and others

    1994-03-01

    This status report summarizes the activities and accomplishments of the Los Alamos Yucca Mountain Site Characterization Project`s quality assurance program for calendar year 1992. The report includes major sections on Program Activities and Trend Analysis. Program Activities are discussed periodically at quality meetings. The most significant issue addressed in 1992 has been the timely revision of quality administrative procedures. The procedure revision process was streamlined from 55 steps to 7. The number of forms in procedures was reduced by 38%, and the text reduced by 29%. This allowed revision in 1992 of almost half of all implementing procedures. The time necessary to complete the revision process (for a procedure) was reduced from 11 months to 3 months. Other accomplishments include the relaxation of unnecessarily strict training requirements, requiring quality assurance reviews only from affected organizations, and in general simplifying work processes. All members of the YMP received training to the new Orientation class Eleven other training classed were held. Investigators submitted 971 records to the Project and only 37 were rejected. The software program has 115 programs approved for quality-affecting work. The Project Office conducted 3 audits and 1 survey of Los Alamos activities. We conducted 14 audits and 4 surveys. Eight corrective action reports were closed, leaving only one open. Internally, 22 deficiencies were recognized. This is a decrease from 65 in 1991. Since each deficiency requires about 2 man weeks to resolve, the savings are significant. Problems with writing acceptable deficiency reports have essentially disappeared. Trend reports for 1992 were examined and are summarized herein. Three adverse trends have been closed; one remaining adverse trend will be closed when the affected procedures are revised. The number of deficiencies issued to Los Alamos compared to other participants is minimal.

  8. Dip-coating process. Silicon sheet growth development for the large-area silicon sheet task of the low-cost silicon solar array project. Quarterly report No. 7

    Energy Technology Data Exchange (ETDEWEB)

    Zook, J.D.; Heaps, J.D.; Maciolek, R.B.; Koepke, B.; Butter, C.D.; Schuldt, S.B.

    1977-12-30

    The objective of this research program is to investigate the technical and economic feasibility of producing solar-cell-quality sheet silicon by coating one surface of carbonized ceramic substrates with a thin layer of large-grain polycrystalline silicon from the melt. During the past quarter, significant progress was demonstrated in several areas. Seeded growth of silicon-on-ceramic (SOC) with an EFG ribbon seed was demonstrated. Different types of mullite received from Coors were successfully coated with silicon. A new method of deriving minority carrier diffusion length, L/sub n/, from spectral response measurements was evaluated. ECOMOD cost projections were found to be in good agreement with the interim SAMIS method proposed by JPL. On the less positive side, there was a decrease in cell performance which is believed to be due to an unidentified source of impurities. Also, operation of the new coating system fell behind schedule but is expected to improve in the coming quarter, since construction has now been completed.

  9. 94-1 research and development project lead laboratory support. Status report, October 1--December 31, 1996

    Energy Technology Data Exchange (ETDEWEB)

    Rink, N.A. [comp.

    1997-07-01

    This status report is published for Los Alamos National Laboratory 94-1 Research and Development (R and D) projects. The Department of Energy Office of Environmental Management (DOE/EM) funds these projects in order to support the storage or disposal of legacy plutonium and plutonium-bearing materials that resulted from weapons production throughout the DOE complex. This report summarizes status and technical progress for Materials Identification and Surveillance; Stabilization Process Development; Surveillance and Monitoring; Core Technology; Separations; Materials Science; Synthesis and Structural Characterization of Plutonium(IV) and Plutonium(VI) Phosphates; Plutonium Phosphate Solution Chemistry; and Molten Salt/Nonaqueous Electrochemistry.

  10. Current status of decommissioning projects and their strategies in advanced countries

    Energy Technology Data Exchange (ETDEWEB)

    Chung, U. S.; Lee, K. W.; Hwang, D. S.; Park, S. K.; Hwang, S. T.; Paik, S. T.; Park, J. H.; Choi, Y. D.; Chung, K. H.; Lee, K. I.; Hong, S. B

    2007-06-15

    At the Korea Atomic Energy Research Institute(KAERI), two projects for decommissioning of the research reactors and uranium conversion plant are carried out. The number of nuclear facilities to be dismantled will be much increased in future and the decommissioning industries will be enlarged. Keeping pace with this increasing tendency, each country formulated their own strategies and regulation systems, and applied their own technologies. The international organizations such as the IAEA and the OECD/NEA also prepared standards in technologies and regulation upon decommissioning and recommended to adopt them to the decommissioning projects. These strategies and technologies are very different country by country due to the different site dependent conditions and it will not be reasonable to evaluate their merits and weakness. The world wide status of the decommissioning, highlighted on that of 5 countries of USA, UK, France, Germany and Japan because they are advanced counties in nuclear industries, are summarized and their site specific conditions are evaluated. The scopes of the evaluation are decommissioning strategies, licensing procedures and requirements focused on decommissioning plan, waste management, technology development and so on. The detailed decommissioning progresses of several typical example sites were introduced. The activities on decommissioning field of the international organization, increased according to the enlarged decommissioning industries, are also summarized.

  11. Decontamination and decommissioning project status of the TRIGA Mark-II and III reactors in Korea

    Energy Technology Data Exchange (ETDEWEB)

    Paik, S. T.; Park, S. K.; Chung, K. W.; Chung, U. S.; Jung, K. J. [TRIGA Research Reactor D and D Project Team, Korea Atomic Energy Research Insitutute, Taejon (Korea, Republic of)

    1999-07-01

    The decontamination and decommissioning (D and D) project of the TRIGA Mark-II and Mark-III was started in January 1997, after their shutdown in 1995 due to their life and the operation of a new research reactor, HANARO, at the KAERI site in Taejon. Preparation of the decommissioning plan and environmental impact assessment, and setting up of licensing procedure and documentation for the project were performed in 1997. At the end of 1997, Hyundai Engineering Company (HEC) was selected as the main contractor to do design and licensing documentation for the D and D of both reactors. British Nuclear Fuels Plc. (BNFL) was the technical assisting partner to Heck. Licensing documents were submitted to the Ministry of Science and Technology (MOST) at the end of 1998. And the Korea Institute of Nuclear Safety (KINS) is reviewing the documents. Practical work of the D and D will start at the end of 1999 upon the government issues the license. In the meantime, July 1998, all spent fuels from the TRIGA Mark-II and III were safely transported to the US. The foremost part of the D and D work will be the TRIGA Mark-III reactor hall that will be used as a temporary storage of radioactive waste produced during the D and D work, and followed by the TRIGA Mark-II and auxiliary facilities. This paper summarizes the current status and future plans for the D and D work. (author)

  12. European Gravity Service for Improved Emergency Management - Status and project highlights

    Science.gov (United States)

    Mayer-Guerr, Torsten; Adrian, Jäggi; Meyer, Ulrich; Jean, Yoomin; Susnik, Andreja; Weigelt, Matthias; van Dam, Tonie; Flechtner, Frank; Gruber, Christian; Güntner, Andreas; Gouweleeuw, Ben; Kvas, Andreas; Klinger, Beate; Flury, Jakob; Bruinsma, Sean; Lemoine, Jean-Michel; Zwenzner, Hendrik; Bourgogne, Stephane; Bandikova, Tamara

    2016-04-01

    The European Gravity Service for Improved Emergency Management (EGSIEM) is a project of the Horizon 2020 Framework Programme for Research and Innovation of the European Commission. EGSIEM shall demonstrate that observations of the redistribution of water and ice mass derived from the current GRACE mission, the future GRACE-FO mission, and additional data provide critical and complementary information to more traditional Earth Observation products and open the door for innovative approaches to flood and drought monitoring and forecasting. In the frame of EGSIEM three key services should established: 1) a scientific combination service to deliver the best gravity products for applications in Earth and environmental science research based on the unified knowledge of the European GRACE community, 2) a near real-time and regional service to reduce the latency and increase the temporal resolution of the mass redistribution products, and 3) a hydrological and early warning service to develop gravity-based indicators for extreme hydrological events and to demonstrate their value for flood and drought forecasting and monitoring services. All of these services shall be tailored to the various needs of the respective communities. Significant efforts shall also be devoted to transform the service products into user-friendly and easy-to-interpret data sets and the development of visualization tools. In this talk the status of the ongoing project is presented and selected results are discussed.

  13. Continuous Czochralski growth: silicon sheet growth development of the large area silicon sheets task of the Low Cost Silicon Solar Array Project. Ninth quarterly progress report, October 1-December 31, 1979

    Energy Technology Data Exchange (ETDEWEB)

    Lane, R.L.; Roberts, E.

    1979-01-01

    During this reporting period, four more 100 kg continuous runs were completed to satisfy the six required by the project extension. One of the four (2*) was performed using a new standard CG2000 RC grower, using accessory equipment and process techniques developed under this project. The sixth and final 100 kg continuous run was performed with purified carbon parts and resulted in the best results to date. Run No. 62 resulted in 103.0 kg being pulled from 104.5 kg total charge weight (98.6% pulled yield). Of this 103 kg grown, 89.3 kg were monocrystalline. Moreover, 72.2 kg was OD material. Another encouraging result was that 85% of the eighth crystal was monocrystalline and 67% of the ninth and last crystal was monocrystaline after ninety seven hours of continuous growth. Impurity analysis data indicate that impurity build-up in grown crystals during 100 kg continuous runs is insignificant. However, the results indicate that impurities tend to accumulate in the crucible. Moreover, impurity analysis performed on new crucibles indicates that these new crucibles may not be as pure as the manufacturer's literature states. Solar cell efficiency data from two 100 kg continuous runs were received this quarter with very encouraging results. The average efficiencies of all cells tested was 16.35% AM1, which is considerably higher than our 14% AM1 goal. Moreover, the efficiencies remained at or near the same levels throughout the entire 100 kg continuous run. We expect to receive solar cell efficiency results from three more of the 100 kg continuous runs in the next quarter.

  14. Developing European conservation and mitigation tools for pollination services: approaches of the STEP (Status and Trends of European Pollinators) project

    NARCIS (Netherlands)

    Potts, S.G.; Biesmeijer, J.C.; Bommarco, R.; Felicioli, A.; Fischer, M.; Jokinen, P.; Kleijn, D.; Klein, A.M.; Kunin, W.E.; Neumann, P.; Penev, L.D.; Petanidou, T.; Rasmont, P.; Roberts, S.P.M.; Smith, H.G.; Sorensen, P.B.; Steffan-Dewenter, I.; Vaissiere, B.E.; Vila, M.; Vujic, A.; Woyciechowski, M.; Zobel, M.; Settele, J.; Schweiger, O.

    2011-01-01

    Pollinating insects form a key component of European biodiversity, and provide a vital ecosystem service to crops and wild plants. There is growing evidence of declines in both wild and domesticated pollinators, and parallel declines in plants relying upon them. The STEP project (Status and Trends o

  15. Project Radiation Protection East. Swedish cooperation program for radiation protection in Eastern and Central Europe. Status Report, March 1996

    Energy Technology Data Exchange (ETDEWEB)

    Snihs, J.O.; Johansson, Mai [Swedish Radiation Protection Inst., Stockholm (Sweden); Grapengiesser, S. [STEGRA Consultants (Sweden); Bennerstedt, T. [Tekno Telje (Sweden)

    1996-04-01

    Until now the Swedish program for radiation protection work in central and Eastern europe has been granted 55 MSEK by the Swedish government. The projects are assessed, planned and performed in close cooperation with partner organizations in the East. Since 1994, radiation protection cooperation concerning the former Soviet Navy training reactors in Paldiski, Estonia, is included in Radiation Protection East. The government has granted 8 MSEK for this purpose. This report presents a summary over some 150 projects, their status, allocated funds and their distribution over countries and project areas. The presentation is updated up to March 1996. 7 figs.

  16. BX in situ oil shale project. Annual technical progress report, March 1, 1979-February 29, 1980 and quarterly technical progress report, December 1, 1979-February 29, 1980

    Energy Technology Data Exchange (ETDEWEB)

    Dougan, P.M.

    1980-03-20

    During the year, design, construction and installation of all project equipment was completed, and continuous steam injection began on September 18, 1979 and continued until February 29, 1980. In the five-month period of steam injection, 235,060 barrels of water as steam at an average wellhead pressure of 1199 psig and an average wellhead temperature of 456/sup 0/F were injected into the eight project injection wells. Operation of the project at design temperature and pressure (1000/sup 0/F and 1500 psig) was not possible due to continuing problems with surface equipment. Environmental monitoring at the project site continued during startup and operation.

  17. Southern African Large Telescope (SALT) project: progress and status after 2 years

    Science.gov (United States)

    Meiring, Jacobus G.; Buckley, David A. H.; Lomberg, Michael C.; Stobie, Robert S.

    2003-02-01

    The Southern African Large Telescope (SALT) is a 10-m class optical/IR segmented mirror telescope based on the groundbreaking, low cost, Hobby-Eberly Telescope (HET) design. Approval to construct and operate SALT, which will be the largest single optical telescope in the Southern Hemisphere, was given by the South African Government in November 1999, after sufficient guarantees of matching funding from international partners were secured. Facility construction started in January 2001, and SALT is due to start operations by December 2004. SALT will enable a quantum leap in astronomical research capability in Southern Africa, and indeed the continent, where currently the largest telescope is a modest 1.9-m, dating to the 1940s. A substantial amount of design work for SALT has been completed, sourced from multiple suppliers, with ~60% South African content. South African industry is well equipped to handle the construction of most of the telescope, the exceptions being the glass ceramic mirror blanks (from LZOS in Russia), the polishing and ion figuring of these (Eastman Kodak in the USA), and fabrication of the four-element spherical aberration corrector (SAGEM in France). This paper will present (1) the scientific requirements, (2) the specified performance of SALT, (3) the basic design, with emphasis on the innovative modifications to the HET design that enable significantly improved performance, (4) the progress and status of the project, currently in its construction phase, (5) the first generation instrument suite, (6) the management and organisation of the project and (7) the international partnership in SALT.

  18. Jordan's First Research Reactor Project: Driving Forces, Present Status and the Way Ahead

    Energy Technology Data Exchange (ETDEWEB)

    Xoubi, Ned, E-mail: Ned@Xoubi.co [Jordan Atomic Energy Commission (JAEC), P.O.Box 70, Shafa Badran, 11934 Amman (Jordan)

    2011-07-01

    In a gigantic step towards establishing Jordan's nuclear power program, Jordan Atomic Energy Commission (JAEC) is building the first nuclear research and test reactor in the Kingdom. The new reactor will serve as the focal point for Jordan Center for Nuclear Research (JCNR), a comprehensive state of the art nuclear center not only for Jordan but for the whole region, the center will include in addition to the reactor a radioisotopes production plant, a nuclear fuel fabrication plant, a cold neutron source (CNS), a radioactive waste treatment facility, and education and training center. The JRTR reactor is the only research reactor new build worldwide in 2010, it is a 5 MW light water open pool multipurpose reactor, The reactor core is composed of 18 fuel assemblies, MTR plate type, with 19.75% enriched uranium silicide (U{sub 3}Si{sub 2}) in an aluminum matrix. It is reflected on all sides by beryllium and graphite blocks. Reactor power is upgradable to 10 MW with a maximum thermal flux of 1.45x10{sup 14} cm{sup -2}s{sup -1}. The reactor reactivity is controlled by four Hafnium Control Absorber Rods (CAR). Jordan Center for Nuclear Research is located in Ramtha city, it is owned by Jordan Atomic Energy Commission (JAEC), and is contracted to Korea Atomic Energy Research Institute (KAERI) and Daewoo E and C. The JCNR project is a 56 months EPC fixed price contract for the design engineering, construction, and commissioning the JCNR reactor, and other nuclear facilities. The project presents many challenges for both the owner and the contractor, being the first nuclear reactor for Jordan, and the first nuclear export for Korea. The driving forces, present status and the way ahead will be presented in this paper. (author)

  19. Status Review of Wildlife Mitigation at 14 of 27 Major Hydroelectric Projects in Idaho, 1983-1984 Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Martin, Robert C.; Mehrhoff, L.A.

    1985-01-01

    The Pacific Northwest Electric Power Planning and Conservation Act and wildlife and their habitats in the Columbia River Basin and to compliance with the Program, the wildlife mitigation status reports coordination with resource agencies and Indian Tribes. developed the Columbia River Basin Fish and Wildlife Program development, operation, and maintenance of hydroelectric projects on existing agreements; and past, current, and proposed wildlife factual review and documentation of existing information on wildlife meet the requirements of Measure 1004(b)(l) of the Program. The mitigation, enhancement, and protection activities were considered. In mitigate for the losses to those resources resulting from the purpose of these wildlife mitigation status reports is to provide a resources at some of the Columbia River Basin hydroelectric projects the river and its tributaries. To accomplish this goal, the Council were written with the cooperation of project operators, and in within Idaho.

  20. Contracts for field projects and supporting research on enhanced oil recovery. Progress review No. 82, quarterly report, January--March 1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-06-01

    This document consists of a list of projects supporting work on oil recovery programs. A publications list and index of companies and institutions is provided. The remaining portion of the document provides brief descriptions on projects in chemical flooding, gas displacement, thermal recovery, geoscience, resource assessment, and reservoir class field demonstrations.

  1. Status of the 3½ Cell Superconducting RF Gun Project in Rossendorf

    CERN Document Server

    Xiang, R; Evtushenko, Pavel; Janssen, Dietmar; Lehnert, Ulf; Michel, Peter; Möller, Karsten; Schneider, Christof; Schurig, Rico; Staufenbiel, Friedrich; Teichert, Jochen; Kamps, Thorsten; Lipka, Dirk; Volkov, Vladimir; Stephan, J; Lehmann, W D; Will, Ingo

    2005-01-01

    In the paper, we report on the status and progress of the superconducting rf gun project in Rossendorf. The gun is designed for cw operation mode with 1mA current and 10 MeV electron energy. The gun will be installed at the ELBE superconducting electron linear accelerator. It will have a 3½ cell niobium cavity operating at 1.3 GHz. The cavity consists of three cells with TESLA geometry and a specially designed half-cell in which the photocathode will be placed. Two Nb cavities, with RRR 300 and 40 respectively, will be finished at the beginning of 2005. After delivery, the rf tests will be performed and the treatment of the cavities will be started. At the same time, the design of the cryostat is finished and the fabrication of its components is under way. Further activities are the design of the diagnostic beam line, the assembling of the new photocathode preparation system, and the upgrade of the 262 nm driver laser system.

  2. The Status of Topographic Mapping in the World a Unggim-Isprs Project 2012-2015

    Science.gov (United States)

    Konecny, G.; Breitkopf, U.; Radtke, A.

    2016-06-01

    In December 2011, UNGGIM initiated a cooperative project with ISPRS to resume the former UN Secretariat studies on the status of topographic mapping in the world, conducted between 1968 and 1986. After the design of a questionnaire with 27 questions, the UNGGIM Secretariat sent the questionnaires to the UN member states. 115 replies were received from the 193 member states and regions thereof. Regarding the global data coverage and age, the UN questionnaire survey was supplemented by data from the Eastview database. For each of the 27 questions, an interactive viewer was programmed permitting the analysis of the results. The authoritative data coverage at the various scale ranges has greatly increased between 1986 and 2012. Now, a 30 % 1 : 25 000 map data coverage and a 75 % 1 : 50 000 map data coverage has been completed. Nevertheless, there is still an updating problem, as data for some countries is 10 to 30 years old. Private Industry, with Google, Microsoft and Navigation system providers, have undertaken huge efforts to supplement authoritative mapping. For critical areas on the globe, MGCP committed to military mapping at 1 : 50 000. ISPRS has decided to make such surveys a sustainable issue by establishing a working group.

  3. THE STATUS OF TOPOGRAPHIC MAPPING IN THE WORLD A UNGGIM–ISPRS PROJECT 2012–2015

    Directory of Open Access Journals (Sweden)

    G. Konecny

    2016-06-01

    Full Text Available In December 2011, UNGGIM initiated a cooperative project with ISPRS to resume the former UN Secretariat studies on the status of topographic mapping in the world, conducted between 1968 and 1986. After the design of a questionnaire with 27 questions, the UNGGIM Secretariat sent the questionnaires to the UN member states. 115 replies were received from the 193 member states and regions thereof. Regarding the global data coverage and age, the UN questionnaire survey was supplemented by data from the Eastview database. For each of the 27 questions, an interactive viewer was programmed permitting the analysis of the results. The authoritative data coverage at the various scale ranges has greatly increased between 1986 and 2012. Now, a 30 % 1 : 25 000 map data coverage and a 75 % 1 : 50 000 map data coverage has been completed. Nevertheless, there is still an updating problem, as data for some countries is 10 to 30 years old. Private Industry, with Google, Microsoft and Navigation system providers, have undertaken huge efforts to supplement authoritative mapping. For critical areas on the globe, MGCP committed to military mapping at 1 : 50 000. ISPRS has decided to make such surveys a sustainable issue by establishing a working group.

  4. The Statuses of GOSAT and GOSAT-2 Projects at National Institute for Environmental Studies (NIES)

    Science.gov (United States)

    Matsunaga, Tsuneo; Yokota, Tatsuya; Maksyutov, Shamil; Morino, Isamu; Yoshida, Yukio; Saito, Makoto; Ajiro, Masataka; Uchino, Osamu

    2015-04-01

    column amount products will also use TCCON data. As a part of GOSAT-2 project, a new TCCON site in the southeast Asian region will be installed well before the commencement of GOSAT-2 observation. The current statuses of NIES GOSAT and GOSAT-2 projects, including GOSAT higher-level product regeneration schedule and GOSAT-2 higher-level product generation plan, will be presented.

  5. Fitness but not weight status is associated with projected physical independence in older adults.

    Science.gov (United States)

    Sardinha, Luis B; Cyrino, Edilson S; Santos, Leandro Dos; Ekelund, Ulf; Santos, Diana A

    2016-06-01

    Obesity and fitness have been associated with older adults' physical independence. We aimed to investigate the independent and combined associations of physical fitness and adiposity, assessed by body mass index (BMI) and waist circumference (WC) with the projected ability for physical independence. A total of 3496 non-institutionalized older adults aged 65 and older (1167 male) were included in the analysis. BMI and WC were assessed and categorized according to established criteria. Physical fitness was evaluated with the Senior Fitness Test and individual test results were expressed as Z-scores. Projected ability for physical independence was assessed with the 12-item composite physical function scale. Logistic regression was used to estimate the odds ratio (OR) for being physically dependent. A total of 30.1 % of participants were classified as at risk for losing physical independence at age 90 years. Combined fitness and fatness analysis demonstrated that unfit older adults had increased odds ratio for being physically dependent in all BMI categories (normal: OR = 9.5, 95 %CI = 6.5-13.8; overweight: OR = 6.0, 95 %CI = 4.3-8.3; obese: OR = 6.7, 95 %CI = 4.6-10.0) and all WC categories (normal: OR = 10.4, 95%CI = 6.5-16.8; middle: OR = 6.2, 95 %CI = 4.1-9.3; upper: OR = 7.0, 95 %CI = 4.8-10.0) compared to fit participants that were of normal weight and fit participants with normal WC, respectively. No increased odds ratio was observed for fit participants that had increased BMI or WC. In conclusion, projected physical independence may be enhanced by a normal weight, a normal WC, or an increased physical fitness. Adiposity measures were not associated with physical independence, whereas fitness is independently related to physical independence. Independent of their weight and WC status, unfit older adults are at increased risk for losing physical independence.

  6. BepiColombo Euro-Japan Joint mission to Mercury: MMO Project Status

    Science.gov (United States)

    Hayakawa, H.; Maejima, H.; BepiColombo MMO Project Team

    2011-12-01

    ) meeting, which discusses science related matters, will be held on Sep. 2009 following to the MESSENGER-BepiColombo Joint Workshop. In this paper, we will report the latest information of MMO project status.

  7. Silicon Materials Task of the Low Cost Solar Array Project (Phase II). Eighth quarterly report, July 1, 1977--September 30, 1977

    Energy Technology Data Exchange (ETDEWEB)

    Hopkins, R.H.; Blais, P.D.; Davis, J.R.; Hanes, M.H.; Rai-Choudhury, P.; Rohatgi, A.; McCormick, J.R.

    1977-12-01

    The objective of Phase II of this program is to investigate the effects of various processes, metal contaminants, and contaminant-process interactions on the performance of terrestrial silicon solar cells so that purity requirements for a solar grade silicon can be delineated. The program approach consists in (1) the growth of doubly and multiply-doped silicon single crystals containing a baseline boron or phosphorus dopant and specific impurities which produce deep levels in the forbidden band gap, (2) assessment of these crystals by a battery of chemical, microstructural, electrical and solar cell tests, (3) correlation of the impurity kind and level with crystal quality and device performance, (4) delineation of the role of impurities and processing on subsequent silicon solar cell performance, and (5) determination of the combined effects of impurities and growth rate on the crystal quality and cell performance of silicon produced by both the dendritic web and Czochralski methods. The central thrust of activities this quarter was in three areas: the crystal growth of impurity-bearing ingots with different base doping types and concentrations; evaluation of the solar cell performance of n-base and p-base devices; and refinement of techniques for the analysis of solar cells subjected to various contaminants and process variations.

  8. EMSL Quarterly Highlights Report: 1st Quarter, Fiscal Year 2009

    Energy Technology Data Exchange (ETDEWEB)

    Showalter, Mary Ann; Kathmann, Loel E.; Manke, Kristin L.

    2009-02-02

    The EMSL Quarterly Highlights Report covers the science, staff and user recognition, and publication activities that occurred during the 1st quarter (October 2008 - December 2008) of Fiscal Year 2009.

  9. EMSL Quarterly Highlights Report: 1st Quarter, FY08

    Energy Technology Data Exchange (ETDEWEB)

    Showalter, Mary Ann

    2008-01-28

    The EMSL Quarterly Highlights Report covers the science, staff and user recognition, and publication activities that occurred during the 1st quarter (October 2007 - December 2007) of Fiscal Year 2008.

  10. EMSL Quarterly Highlights Report: FY 2008, 3rd Quarter

    Energy Technology Data Exchange (ETDEWEB)

    Showalter, Mary Ann

    2008-09-16

    The EMSL Quarterly Highlights Report covers the science, staff and user recognition, and publication activities that occurred during the 1st quarter (October 2007 - December 2007) of Fiscal Year 2008.

  11. 94-1 Research and Development Project Lead laboratory support. Status report, October 1--December 31, 1995

    Energy Technology Data Exchange (ETDEWEB)

    Dinehart, M. [comp.

    1996-05-01

    This is a quarterly progress report of the 94-1 Research and Development Lead Laboratory Support Technical Program Plan for the first quarter of FY 1996. The report provides details concerning descriptions, DOE-complex-wide material stabilization technology needs, scientific background and approach, progress, benefits to the DOE complex, and collaborations for selected subprojects. An executive summary and report on end-of-quarter spending is included.

  12. New York State Energy Research and Development Authority. Research projects` update project status as of March 31, 1997

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-07-01

    This report provides an update of the New York State Energy Research and Development Authority (NYSERDA) program. The NYSERDA research and development program has five major areas: industry, buildings, energy resources, transportation, and environment. NYSERDA organizes projects within these five major areas based on energy use and supply, and end-use sectors. Therefore, issues such as waste management, energy products and renewable energy technologies are addressed in several areas of the program. The project descriptions presented are organized within the five program areas. Descriptions of projects completed between the period April 1, 1996, and March 31, 1997, including technology-transfer activities, are at the end of each subprogram section.

  13. The Carolina Bay Restoration Project - Status Report II 2000-2004.

    Energy Technology Data Exchange (ETDEWEB)

    Barton, Christopher

    2006-07-13

    A Wetlands Mitigation Bank was established at SRS in 1997 as a compensatory alternative for unavoidable wetland losses. Prior to restoration activities, 16 sites included in the project were surveyed for the SRS Site Use system to serve as a protective covenant. Pre-restoration monitoring ended in Fall 2000, and post restoration monitoring began in the Winter/Spring of 2001. The total interior harvest in the 16 bays after harvesting the trees was 19.6 ha. The margins in the opencanopy, pine savanna margin treatments were thinned. Margins containing areas with immature forested stands (bay 5184 and portions of bay 5011) were thinned using a mechanical shredder in November 2001. Over 126 hectares were included in the study areas (interior + margin). Planting of two tree species and the transplanting of wetland grass species was successful. From field surveys, it was estimated that approximately 2700 Nyssa sylvatica and 1900 Taxodium distichum seedlings were planted in the eight forested bays resulting in an average planting density of ≈ 490 stems ha-1. One hundred seedlings of each species per bay (where available) were marked to evaluate survivability and growth. Wetland grass species were transplanted from donor sites on SRS to plots that ranged in size from 100 – 300 m2, depending on wetland size. On 0.75 and 0.6 meter centers, respectively, 2198 plugs of Panicum hemitomon and 3021 plugs Leersia hexandra were transplanted. New shoots originating from the stumps were treated with a foliar herbicide (Garlon® 4) during the summer of 2001 using backpack sprayers. Preliminary information from 2000-2004 regarding the hydrologic, vegetation and faunal response to restoration is presented in this status report. Post restoration monitoring will continue through 2005. A final report to the Mitigation Bank Review Team will be submitted in mid-2006.

  14. Status of volcanism studies for the Yucca Mountain Site Characterization Project

    Energy Technology Data Exchange (ETDEWEB)

    Crowe, B.; Perry, F.; Murrell, M.; Poths, J.; Valentine, G.A. [Los Alamos National Lab., NM (United States); Wells, S. [Univ. of California, Riverside, CA (United States); Bowker, L.; Finnegan, K. [Univ. of Nevada, Las Vegas, NV (United States); Geissman, J.; McFadden, L.

    1995-02-01

    Chapter 1 introduces the volcanism issue for the Yucca Mountain site and provides the reader with an overview of the organization, content, and significant conclusions of this report. The risk of future basaltic volcanism is the primary topic of concern including both events that intersect a potential repository and events that occur near or within the waste isolation system of a repository. Chapter 2 describes the volcanic history of the Yucca Mountain region (YMR) and emphasizes the Pliocene and Quaternary volcanic record, the interval of primary concern for volcanic risk assessment. The Lathrop Wells volcanic center is described in detail because it is the youngest basalt center in the YMR. Chapter 3 describes the tectonic setting of the YMR and presents and assesses the significance of multiple alternative tectonic models. Geophysical data are described for the YMR and are used as an aid to understand the distribution of basaltic volcanic centers. Chapter 4 discusses the petrologic and geochemical features of basaltic volcanism in the YMR, the southern Great Basin and the Basin and Range province. The long time of activity and characteristic small volume of the Postcaldera basalt of the YMR result in one of the lowest eruptive rates in a volcanic field in the southwest United States. Chapter 5 summarizes current concepts of the segregation, ascent, and eruption of basalt magma. Chapter 6 summarizes the history of volcanism studies (1979 through early 1994), including work for the Yucca Mountain Site Characterization Project and overview studies by the state of Nevada and the Nuclear Regulatory Commission. Chapter 7 summarizes probabilistic volcanic hazard assessment using a three-part conditional probability model. Chapter 8 describes remaining volcanism work judged to be needed to complete characterization studies for the YMR. Chapter 9 summarizes the conclusions of this volcanism status report.

  15. Status of groundwater quality in the Santa Barbara Study Unit, 2011: California GAMA Priority Basin Project

    Science.gov (United States)

    Davis, Tracy A.; Kulongoski, Justin T.

    2016-10-03

    Groundwater quality in the 48-square-mile Santa Barbara study unit was investigated in 2011 as part of the California State Water Resources Control Board’s Groundwater Ambient Monitoring and Assessment (GAMA) Program Priority Basin Project. The study unit is mostly in Santa Barbara County and is in the Transverse and Selected Peninsular Ranges hydrogeologic province. The GAMA Priority Basin Project is carried out by the U.S. Geological Survey in collaboration with the California State Water Resources Control Board and Lawrence Livermore National Laboratory.The GAMA Priority Basin Project was designed to provide a statistically unbiased, spatially distributed assessment of the quality of untreated groundwater in the primary aquifer system of California. The primary aquifer system is defined as that part of the aquifer corresponding to the perforation interval of wells listed in the California Department of Public Health database for the Santa Barbara study unit. This status assessment is intended to characterize the quality of groundwater resources in the primary aquifer system of the Santa Barbara study unit, not the treated drinking water delivered to consumers by water purveyors.The status assessment for the Santa Barbara study unit was based on water-quality and ancillary data collected in 2011 by the U.S. Geological Survey from 23 sites and on water-quality data from the California Department of Public Health database for January 24, 2008–January 23, 2011. The data used for the assessment included volatile organic compounds; pesticides; pharmaceutical compounds; two constituents of special interest, perchlorate and N-nitrosodimethylamine (NDMA); and naturally present inorganic constituents, such as major ions and trace elements. Relative-concentrations (sample concentration divided by the health- or aesthetic-based benchmark concentration) were used to evaluate groundwater quality for those constituents that have federal or California regulatory and non

  16. Status of groundwater quality in the Santa Barbara Study Unit, 2011: California GAMA Priority Basin Project

    Science.gov (United States)

    Davis, Tracy A.; Kulongoski, Justin T.

    2016-10-03

    Groundwater quality in the 48-square-mile Santa Barbara study unit was investigated in 2011 as part of the California State Water Resources Control Board’s Groundwater Ambient Monitoring and Assessment (GAMA) Program Priority Basin Project. The study unit is mostly in Santa Barbara County and is in the Transverse and Selected Peninsular Ranges hydrogeologic province. The GAMA Priority Basin Project is carried out by the U.S. Geological Survey in collaboration with the California State Water Resources Control Board and Lawrence Livermore National Laboratory.The GAMA Priority Basin Project was designed to provide a statistically unbiased, spatially distributed assessment of the quality of untreated groundwater in the primary aquifer system of California. The primary aquifer system is defined as that part of the aquifer corresponding to the perforation interval of wells listed in the California Department of Public Health database for the Santa Barbara study unit. This status assessment is intended to characterize the quality of groundwater resources in the primary aquifer system of the Santa Barbara study unit, not the treated drinking water delivered to consumers by water purveyors.The status assessment for the Santa Barbara study unit was based on water-quality and ancillary data collected in 2011 by the U.S. Geological Survey from 23 sites and on water-quality data from the California Department of Public Health database for January 24, 2008–January 23, 2011. The data used for the assessment included volatile organic compounds; pesticides; pharmaceutical compounds; two constituents of special interest, perchlorate and N-nitrosodimethylamine (NDMA); and naturally present inorganic constituents, such as major ions and trace elements. Relative-concentrations (sample concentration divided by the health- or aesthetic-based benchmark concentration) were used to evaluate groundwater quality for those constituents that have federal or California regulatory and non

  17. Federal Assistance Program Quarterly Project Progress Report. Geothermal Energy Program: Information Dissemination, Public Outreach, and Technical Analysis Activities. Reporting Period: January 1 - March 31, 2001 [Final report

    Energy Technology Data Exchange (ETDEWEB)

    Lund, John W.

    2002-03-22

    The final report of the accomplishments of the geothermal energy program: information dissemination, public outreach and technical analysis activities by the project team consisting of the Geo-Heat Center, Geothermal Resources Council, Geothermal Education Office, Geothermal Energy Association and the Washington State University Energy Program.

  18. W-519 Sagebrush Mitigation Project FY-2004 Final Review and Status

    Energy Technology Data Exchange (ETDEWEB)

    Durham, Robin E.; Sackschewsky, Michael R.

    2004-09-30

    This report summarizes activities conducted as mitigation for loss of sagebrush-steppe habitats due to Project W-519, the construction of the infrastructure for the Tank Waste Remediation System Vitrification Plant. The focus of this report is to provide a review and final status of mitigation actions performed through FY2004. Data collected since FY1999 have been included where appropriate. The Mitigation Action Plan (MAP) for Project W-519 prescribed three general actions to be performed as mitigation for the disturbance of approximately 40 ha (100 acres) of mature sagebrush-steppe habitat. These actions included: (1) transplanting approximately 130,000 sagebrush seedlings on the Fitzner-Eberhardt Arid Lands Ecology Reserve (ALE); (2) rectification of the new transmission line corridor via seeding with native grasses and sagebrush; and (3) research on native plant species with a goal of increasing species diversity in future mitigation or restoration actions. Nearly 130,000 Wyoming big sagebrush seedlings where planted on ALE during FY2000 and FY2001. About 39,000 of those seedlings were burned during the 24-Command Fire of June 2000. The surviving and subsequent replanting has resulted in about 91,000 seedlings that were planted across four general areas on ALE. A 50% survival rate at any monitoring period was defined as the performance standard in the MAP for this project. Data collected in 2004 indicate that of the over 5000 monitored plants, 51.1% are still alive, and of those the majority are thriving and blooming. These results support the potential for natural recruitment and the ultimate goal of wildlife habitat replacement. Thus, the basic performance standard for sagebrush survival within the habitat compensation planting has been met. Monitoring activities conducted in 2004 indicate considerable variation in seedling survival depending on the type of plant material, site conditions, and to a lesser extent, treatments performed at the time of planting

  19. Status of groundwater quality in the Coastal Los Angeles Basin, 2006-California GAMA Priority Basin Project

    Science.gov (United States)

    Goldrath, Dara; Fram, Miranda S.; Land, Michael; Belitz, Kenneth

    2012-01-01

    Groundwater quality in the approximately 860-square-mile (2,227-square-kilometer) Coastal Los Angeles Basin study unit (CLAB) was investigated as part of the Priority Basin Project of the Groundwater Ambient Monitoring and Assessment (GAMA) Program. The study area is located in southern California in Los Angeles and Orange Counties. The GAMA Priority Basin Project is being conducted by the California State Water Resources Control Board in collaboration with the U.S. Geological Survey (USGS) and the Lawrence Livermore National Laboratory. The GAMA CLAB study was designed to provide a spatially unbiased assessment of the quality of untreated (raw) groundwater in the primary aquifer system. The assessment is based on water-quality and ancillary data collected in 2006 by the USGS from 69 wells and on water-quality data from the California Department of Public Health (CDPH) database. The primary aquifer system was defined by the depth interval of the wells listed in the CDPH database for the CLAB study unit. The quality of groundwater in the primary aquifer system may be different from that in the shallower or deeper water-bearing zones; shallow groundwater may be more vulnerable to surficial contamination. This study assesses the status of the current quality of the groundwater resource by using data from samples analyzed for volatile organic compounds (VOCs), pesticides, and naturally occurring inorganic constituents, such as major ions and trace elements. This status assessment is intended to characterize the quality of groundwater resources in the primary aquifer system of the CLAB study unit, not the treated drinking water delivered to consumers by water purveyors. Relative-concentrations (sample concentration divided by the health- or aesthetic-based benchmark concentration) were used for evaluating groundwater quality for those constituents that have Federal and (or) California regulatory or non-regulatory benchmarks for drinking-water quality. A relative

  20. Testing and verification of granular-bed filters for the removal of particulate and alkalis. Tenth quarterly project report, January 1-March 31, 1983

    Energy Technology Data Exchange (ETDEWEB)

    Lippert, T.E.

    1983-01-01

    The Westinghouse Electric Corporation with Ducon, Inc. and Burns and Roe, Inc. are conducting a test and evaluation program of a Granular-Bed Filter (GBF) for gas-cleaning applications in pressurized-fluidized-bed combustion processes. This work is funded by DOE PRDA for Exploratory Research, Development, Testing and Evaluation of Systems or Devices for Hot Gas Clean-up. This report describes the status of the testing of the subpilot scale GBF unit under simulated Pressurized-Fluidized-Bed Combustion (PFBC) conditions through Phase IV. 9 references, 21 figures, 4 tables.

  1. Project for Minorities and Women in Research: Status Report, 1979 and Proposed Activities, 1980.

    Science.gov (United States)

    Escobedo, Theresa Herrera; Acevedo, Baltazar

    An experimental project at the University of Texas at Austin, which was designed to increase the participation of minorities and women in educational research and related work, is described. The project brings together individuals who are at the post-doctoral and pre-doctoral level to cooperatively work on research questions. The project model…

  2. Quarterly fiscal policy

    NARCIS (Netherlands)

    Kendrick, D.A.; Amman, H.M.

    2014-01-01

    Monetary policy is altered once a month. Fiscal policy is altered once a year. As a potential improvement this article examines the use of feedback control rules for fiscal policy that is altered quarterly. Following the work of Blinder and Orszag, modifications are discussed in Congressional

  3. Environmental monitoring for the DOE coolside and LIMB demonstration extension projects. Quarterly report for the period of February, March and April 1991

    Energy Technology Data Exchange (ETDEWEB)

    White, T.; Contos, L.; Adams, L. [Radian Corp., Research Triangle Park, NC (United States). Progress Center

    1992-02-01

    The purpose of this document is to present environmental monitoring data collected during the US DOE Limestone Injection Multistage Burner (LIMB) Demonstration Project Extension. The objective of the LIMB program is to demonstrate the sulfur dioxide (SO{sub 2}) and nitrogen oxide (NO{sub x}) emission reduction capabilities of the LIMB system. The LIMB system is a retrofit technology to be used for existing coal-fired boilers equipped with electrostatic precipitators. (VC)

  4. Sankt Jørgenbjerg in Roskilde - A gentified quarter?

    OpenAIRE

    Ball, Melanie; Dominguez Blanco, Benito Jesus; Rochau, Maike; Sabatino, Virginie

    2005-01-01

    The project analyses if gentrification is also taking place in, or has been taken place in other cities' quarters than the ones of the metropolises (New York, London, etc.) who often are the basis for hypothesis and theories on gentrification. After a discussion of approaches, Roskilde as a medium sized city and here especially the quarter Skt. Jørgensbjerg are taken into focus for the case study. A questionnaire and its analyse help to draw a picture of the quarter and its inhabitants. I...

  5. Metallurgical Laboratory (HWMF) Groundwater Monitoring Report, Fourth Quarter 1994

    Energy Technology Data Exchange (ETDEWEB)

    Chase, J.A.

    1995-03-01

    Groundwater flow direction and rate in the M-Area Aquifer Zone were similar to previous quarters. Conditions affecting determination of groundwater flow directions and rates in the Upper Lost Lake Aquifer Zone, Lower Lost Lake Aquifer Zone, and the Middle Sand Aquifer Zone of the Crouch Branch Confining Units were also similar to previous quarters. During second quarter 1994, SRS received South Carolina Department of Health and Environmental Control approval for constructing five point-of-compliance wells and two plume definition wells near the Met Lab Hazardous Waste Management Facility. This project began in July 1994 and is complete; however, analytical data from these wells are not yet available.

  6. Phase 1 Final status survey plan for the West Valley demonstration project.

    Energy Technology Data Exchange (ETDEWEB)

    Johnson, R. L. (Environmental Science Division)

    2011-05-31

    This plan provides the technical basis and associated protocols to support Phase 1 final status survey (FSS) data collection and interpretation as part of the West Valley Demonstration Project Phase 1 Decommissioning Plan process. This plan is consistent with the Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM). The Phase 1 Decommissioning Plan provides the relevant derived concentration guideline levels (DCGLs) for the Phase 1 radionuclides of interest. This plan includes protocols that will be applied to the deep excavations planned for Waste Management Area (WMA) 1 and WMA 2, for surface soils outside the WMA 1 and WMA 2 excavations that do not have contamination impacts at depths greater than one meter, and for areas that are used for Phase 1 contaminated soil lay-down purposes. All excavated and lay-down areas will be classified as MARSSIM Class 1 areas. Surface soils that have not been excavated, are not expected to exceed DCGLs, and do not have contamination impacts at depths greater than one meter will be divided into either Class 1 or Class 2 areas depending on the expected potential for surface soil contamination in those areas. The plan uses gamma scans combined with biased soil samples to address DCGLemc concerns. The plan uses systematic soil sampling combined with area factors to address DCGLw and DCGLemc concerns. The Sign test will be used to statistically evaluate DCGLw compliance. If the results from the characterization sampling and analysis plan (CSAP) data collection indicate that background may be a significant issue for Sign test implementation, the Wilcoxon rank sum (WRS) test will be used instead to demonstrate DCGLw compliance. A reference area will be selected on the basis of CSAP data results if the WRS test becomes a necessity. The WMA 1 excavation footprint includes approximately 476 foundation pilings that will be trimmed and left in place. Piling-specific systematic and biased sampling will be conducted to

  7. Status of RHIC head-on beam-beam compensation project

    Energy Technology Data Exchange (ETDEWEB)

    Fischer, W.; Anerella, M.; Beebe, E.; Bruno, D.; Gassner, D.M.; Gu, X.; Gupta, R.C.; Hock, J.; Jain, A.K.; Lambiase, R.; Liu, C.; Luo, Y.; Mapes, M.; Montag, C.; Oerter, B.; Okamura, M.; Pikin, A.I.; Raparia, D.; Tan, Y.; Than, R.; Thieberger, P.; Tuozzolo, J.; Zhang, W.

    2011-03-28

    Two electron lenses are under construction for RHIC to partially compensate the head-on beam-beam effect in order to increase both the peak and average luminosities. The final design of the overall system is reported as well as the status of the component design, acquisition, and manufacturing. An overview of the RHIC head-on beam-beam compensation project is given in [1], and more details in [2]. With 2 head-on beam-beam interactions in IP6 and IP8, a third interaction with a low-energy electron beam is added near IP10 to partially compensate the the head-on beam-beam effect. Two electron lenses are under construction, one for each ring. Both will be located in a region common to both beams, but each lens will act only on one beam. With head-on beam-beam compensation up to a factor of two improvement in luminosity is expected together with a polarized source upgrade. The current RHIC polarized proton performance is documented in Ref. [4]. An electron lens (Fig. 1) consists of an DC electron gun, warm solenoids to focus the electron beam during transport, a superconducting main solenoid in which the interaction with the proton beam occurs, steering magnets, a collector, and instrumentation. The main developments in the last year are given below. The experimental program for polarized program at 100 GeV was expected to be finished by the time the electron lenses are commissioned. However, decadal plans by the RHIC experiments STAR and PHENIX show a continuing interest at both 100 GeV and 250 GeV, and a larger proton beam size has been accommodated in the design (Tab. 1). Over the last year beam and lattice parameters were optimized, and RHIC proton lattices are under development for optimized electron lens performance. The effect of the electron lens magnetic structure on the proton beam was evaluated, and found to be correctable. Experiments were done in RHIC and the Tevatron.

  8. Reports on research work in the field of the safety of nuclear facilities financed by the Federal Minister of the Interior. Period under report: 1st October - 31th December 1980 (17th quarterly report on SR-projects)

    Energy Technology Data Exchange (ETDEWEB)

    1981-01-01

    The BMI (Home Office) finances the performance of studies, expert's reports and other investigations in the field of the safety of nuclear facilities. The results of these studies (CSR-projects) are meant to contribute to the elucidation of still open questions concerning the atomic licensing procedure. The GRS, who are charged by the BMI, give regular information on the state-of-affairs of such investigations. This is done quarterly resp., annually by editing progrss reports within the report series GRS-F. These reports serve to inform the authorities of the Bund and Laender afflicted as well as the reactor safety commission. Each progress report presents a compilation of individual reports arranged according to subject fields. These are written by the contractors themselves in a standardized form as a documentation of the progress of their work and edited by the supervisory board of the GRS (GRS-FB) within the framework of the general information on progress within the investigations on the safety of nuclear facilities. The individual reports are marked in the order of their arrangement with successive numbers. Each report contains, among other things, data on the objective targets, the work performed, the results gained and the continuation of work planned.

  9. Status of the High Brilliance Synchrotron Light Source BESSY-II

    Science.gov (United States)

    Jaeschke, E.

    1997-05-01

    The construction of BESSY-II at Berlin-Adlershof has entered the decisive phase: The injector complex comprising a 50 MeV racetrack microtron and a booster synchrotron with 10 Hz repetition rate and a final energy of 1.9 GeV has been set up ready for commissioning in the 2nd quarter of 1997. All major storage ring components are in house and the assembly of the 240 m DBA storage ring in 16-fold symmetry has started. Stored beam is expected for the 2nd quarter of 1998. The paper describes the status of the project.

  10. The role of the computer in science fair projects: Current status and potential

    Energy Technology Data Exchange (ETDEWEB)

    Trainor, M.S.

    1991-01-01

    The need for more students to enter the field of science is acute in the nation, and science fair projects provide a motivational mechanism to entice students into pursuing scientific careers. Computers play a major role in science today. Because computers are a major source of entertainment for our children, one would expect them to play a significant role in many science fair projects. This study investigated current and potential uses of computers in science fair projects and incorporated an informal case study of scientists, teachers, and students involved in science fair projects from a highly scientific community. Interviews, a survey, and observations were conducted. Results indicated that most projects either do not use or inadequately use computers and that a significant potential for more effective use of computers for science fair projects exists.

  11. The Association of American Publishers' Electronic Manuscript Project: a status report.

    OpenAIRE

    Mehringer, A

    1986-01-01

    In July 1983, the Association of American Publishers (AAP) initiated the Electronic Manuscript Project, with the goal of an industry-wide standard and guidelines for electronic manuscript preparation. The project, viewed as a significant effort throughout the publishing and information communities, consists of six tasks designed to improve productivity and efficiency in publishing and to facilitate bibliographic processing.

  12. Radiotherapy infrastructure and human resources in Switzerland. Present status and projected computations for 2020

    Energy Technology Data Exchange (ETDEWEB)

    Datta, Niloy Ranjan; Khan, Shaka; Marder, Dietmar [KSA-KSB, Kantonsspital Aarau, RadioOnkologieZentrum, Aarau (Switzerland); Zwahlen, Daniel [Kantonsspital Graubuenden, Department of Radiotherapy, Chur (Switzerland); Bodis, Stephan [KSA-KSB, Kantonsspital Aarau, RadioOnkologieZentrum, Aarau (Switzerland); University Hospital Zurich, Department of Radiation Oncology, Zurich (Switzerland)

    2016-09-15

    The purpose of this study was to evaluate the present status of radiotherapy infrastructure and human resources in Switzerland and compute projections for 2020. The European Society of Therapeutic Radiation Oncology ''Quantification of Radiation Therapy Infrastructure and Staffing'' guidelines (ESTRO-QUARTS) and those of the International Atomic Energy Agency (IAEA) were applied to estimate the requirements for teleradiotherapy (TRT) units, radiation oncologists (RO), medical physicists (MP) and radiotherapy technologists (RTT). The databases used for computation of the present gap and additional requirements are (a) Global Cancer Incidence, Mortality and Prevalence (GLOBOCAN) for cancer incidence (b) the Directory of Radiotherapy Centres (DIRAC) of the IAEA for existing TRT units (c) human resources from the recent ESTRO ''Health Economics in Radiation Oncology'' (HERO) survey and (d) radiotherapy utilization (RTU) rates for each tumour site, published by the Ingham Institute for Applied Medical Research (IIAMR). In 2015, 30,999 of 45,903 cancer patients would have required radiotherapy. By 2020, this will have increased to 34,041 of 50,427 cancer patients. Switzerland presently has an adequate number of TRTs, but a deficit of 57 ROs, 14 MPs and 36 RTTs. By 2020, an additional 7 TRTs, 72 ROs, 22 MPs and 66 RTTs will be required. In addition, a realistic dynamic model for calculation of staff requirements due to anticipated changes in future radiotherapy practices has been proposed. This model could be tailor-made and individualized for any radiotherapy centre. A 9.8 % increase in radiotherapy requirements is expected for cancer patients over the next 5 years. The present study should assist the stakeholders and health planners in designing an appropriate strategy for meeting future radiotherapy needs for Switzerland. (orig.) [German] Ziel dieser Studie war es, den aktuellen Stand der Infrastruktur und Personalausstattung der

  13. Is Socio-Economic Status a Determinant of HIV-Related Stigma Attitudes in Zimbabwe? Findings from Project Accept.

    Science.gov (United States)

    Mateveke, Kudzanai; Singh, Basant; Chingono, Alfred; Sibanda, E; Machingura, Ian

    2016-08-17

    HIV related stigma and discrimination is a known barrier for HIV prevention and care. We aimed to assess the relationship between socio-economic status (SES) and HIV related stigma in Zimbabwe. This paper uses data from Project Accept, which examined the impact of community-based voluntary counseling and testing intervention on HIV incidence and stigma. Total of 2522 eligible participants responded to a psychometric assessment tool, which assessed HIV related stigma and discrimination attitudes on 4 point Likert scale. The tool measured three components of HIV-related stigma: shame, blame and social isolation, perceived discrimination, and equity. Participants' ownership of basic assets was used to assess the socio-economic status. Shame, blame and social isolation component of HIV related stigma was found to be significantly associated with medium [odds ratio (OR)=1.73, Psocio-economic context of target population.

  14. Wind/photovoltaic power indicators. Third quarter 2009; Tableau de bord eolien-photovoltaique. troisieme trimestre 2009

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2009-11-15

    This document makes a quarterly status of the power generation from wind and photovoltaic power plants connected to the French grid (continental France, Corsica and overseas territories): total connected load, quarterly connected load during the last years, power generated since the beginning of the year, progress trend of wind and photovoltaic power in France, regional status. (J.S.)

  15. Wind/photovoltaic power indicators. Fourth quarter 2009; Tableau de bord eolien-photovoltaique. Quatrieme trimestre 2009

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2010-02-15

    This document makes a quarterly status of the power generation from wind and photovoltaic power plants connected to the French grid (continental France, Corsica and overseas territories): total connected load, quarterly connected load during the last years, power generated since the beginning of the year, progress trend of wind and photovoltaic power in France, regional status. (J.S.)

  16. Wind/photovoltaic power indicators. Second quarter 2011; Tableau de bord eolien-photovoltaique. Deuxieme trimestre 2011

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2011-07-01

    This document makes a quarterly status of the power generation from wind and photovoltaic power plants connected to the French grid (continental France, Corsica and overseas territories): total connected load, quarterly connected load during the last years, power generated since the beginning of the year, progress trend of wind and photovoltaic power in France, regional status. (J.S.)

  17. Wind/photovoltaic power indicators. First quarter 2011; Tableau de bord eolien-photovoltaique. Premier trimestre 2011

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2011-07-01

    This document makes a quarterly status of the power generation from wind and photovoltaic power plants connected to the French grid (continental France, Corsica and overseas territories): total connected load, quarterly connected load during the last years, power generated since the beginning of the year, progress trend of wind and photovoltaic power in France, regional status. (J.S.)

  18. Wind/photovoltaic power indicators. Third quarter 2010; Tableau de bord eolien-photovoltaique. troisieme trimestre 2010

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2010-07-01

    This document makes a quarterly status of the power generation from wind and photovoltaic power plants connected to the French grid (continental France, Corsica and overseas territories): total connected load, quarterly connected load during the last years, power generated since the beginning of the year, progress trend of wind and photovoltaic power in France, regional status. (J.S.)

  19. Wind/photovoltaic power indicators. First quarter 2010; Tableau de bord eolien-photovoltaique. Premier trimestre 2010

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2010-07-01

    This document makes a quarterly status of the power generation from wind and photovoltaic power plants connected to the French grid (continental France, Corsica and overseas territories): total connected load, quarterly connected load during the last years, power generated since the beginning of the year, progress trend of wind and photovoltaic power in France, regional status. (J.S.)

  20. Wind/photovoltaic power indicators. Fourth quarter 2010; Tableau de bord eolien-photovoltaique. Quatrieme trimestre 2010

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2011-07-01

    This document makes a quarterly status of the power generation from wind and photovoltaic power plants connected to the French grid (continental France, Corsica and overseas territories): total connected load, quarterly connected load during the last years, power generated since the beginning of the year, progress trend of wind and photovoltaic power in France, regional status. (J.S.)

  1. Wind/photovoltaic power indicators. Second quarter 2010; Tableau de bord eolien-photovoltaique. Deuxieme trimestre 2010

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2010-07-01

    This document makes a quarterly status of the power generation from wind and photovoltaic power plants connected to the French grid (continental France, Corsica and overseas territories): total connected load, quarterly connected load during the last years, power generated since the beginning of the year, progress trend of wind and photovoltaic power in France, regional status. (J.S.)

  2. Wind/photovoltaic power indicators. Second quarter 2009; Tableau de bord eolien-photovoltaique. Deuxieme trimestre 2009

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2009-09-15

    This document makes a quarterly status of the power generation from wind and photovoltaic power plants connected to the French grid (continental France, Corsica and overseas territories): total connected load, quarterly connected load during the last years, power generated since the beginning of the year, progress trend of wind and photovoltaic power in France, regional status. (J.S.)

  3. Silicon Materials Task of the Low Cost Solar Array Project (Phase II). Effect of impurities and processing on silicon solar cells. Phase II. Summary and eleventh quarterly report

    Energy Technology Data Exchange (ETDEWEB)

    Hopkins, R.H.; Davis, J.R.; Blais, P.D.; Rohatgi, A.; Rai-Choudhury, P.; Hanes, M.H.; McCormick, J.R.

    1978-07-01

    The effects of various processes, metal contaminants and contaminant-process interactions on the performance of terrestrial silicon solar cells were investigated. A variety of aspects including thermal treatments, crystal growth rate, base doping concentration (low resistivity), base doping type (n vs. p), grain boundary structure, and carbon/oxygen-metal interactions (float zone vs Czochralski growth) were studied. The effects of various metallic impurities were studied, introduced singly or in combination into Czochralski, float zone and polycrystalline silicon ingots and into silicon ribbons grown by the dendritic web process. The totality of the solar cell data (comprising over 4000 cells) indicate that impurity-induced performance loss is primarily due to reduction in base diffusion length. Based on this assumption an analytical model has been developed which predicts cell performance as a function of metal impurity content. The model has now been verified for p-base material by correlating the projected and measured performance of solar cells made on 19 ingots bearing multiple impurities.

  4. Soil-plant water status and wine quality: the case study of Aglianico wine (the ZOViSA project)

    Science.gov (United States)

    Bonfante, Antonello; Manna, Piero; Albrizio, Rossella; Basile, Angelo; Agrillo, Antonietta; De Mascellis, Roberto; Caputo, Pellegrina; Delle Cave, Aniello; Gambuti, Angelita; Giorio, Pasquale; Guida, Gianpiero; Minieri, Luciana; Moio, Luigi; Orefice, Nadia; Terribile, Fabio

    2014-05-01

    The terroir analysis, aiming to achieve a better use of environmental features with respect to plant requirement and wine production, needs to be strongly rooted on hydropedology. In fact, the relations between wine quality and soil moisture regime during the cropping season is well established. The ZOViSA Project (Viticultural zoning at farm scale) tests a new physically oriented approach to terroir analysis based on the relations between the soil-plant water status and wine quality. The project is conducted in southern Italy in the farm Quintodecimo of Mirabella Eclano (AV) located in the Campania region, devoted to quality Aglianico red wine production (DOC). The soil spatial distribution of study area (about 3 ha) was recognized by classical soil survey and geophysics scan by EM38DD; then the soil-plant water status was monitored for three years in two experimental plots from two different soils (Cambisol and Calcisol). Daily climate variables (temperature, solar radiation, rainfall, wind), daily soil water variables (through TDR probes and tensiometers), crop development (biometric and physiological parameters), and grape must and wine quality were monitored. The agro-hydrological model SWAP was calibrated and applied in the two experimental plots to estimate soil-plant water status in different crop phenological stages. The effects of crop water status on crop response and wine quality was evaluated in two different pedo-systems, comparing the crop water stress index with both: crop physiological measurements (leaf gas exchange, leaf water potential, chlorophyll content, LAI measurement), grape bunches measurements (berry weight, sugar content, titratable acidity, etc.) and wine quality (aromatic response). Finally a "spatial application" of the model was carried out and different terroirs defined.

  5. Environmental Restoration Operations: Consolidated Quarterly Report January -March 2017

    Energy Technology Data Exchange (ETDEWEB)

    Cochran, John R. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2017-07-01

    This Environmental Restoration Operations (ER) Consolidated Quarterly Report (ER Quarterly Report) provides the status of ongoing corrective action activities being implemented at Sandia National Laboratories, New Mexico (SNL/NM) during the January, February, and March 2017 quarterly reporting period. Table I-1 lists the Solid Waste Management Units (SWMUs) and Areas of Concern (AOCs) identified for corrective action at SNL/NM. Sections I.2.1 and I.2.2 summarize the work completed during this quarter. Section I.2.1 summarizes the quarterly activities at sites undergoing corrective action field activities. Field activities are conducted at the three groundwater AOCs (Burn Site Groundwater [BSG AOC], Technical Area [TA]-V Groundwater [TAVG AOC], and Tijeras Arroyo Groundwater [TAG AOC]). Section I.2.2 summarizes quarterly activities at sites where the New Mexico Environment Department (NMED) Hazardous Waste Bureau (HWB) issued a certificate of completion and the sites are in the corrective action complete (CAC) regulatory process. Currently, SWMUs 8 and 58, 68, 149, 154, and 502 are in the CAC regulatory process. Corrective action activities are deferred at the Long Sled Track (SWMU 83), the Gun Facilities (SWMU 84), and the Short Sled Track (SWMU 240) because these three sites are active mission facilities. These three active mission sites are located in TA-III. This Sandia National Laboratories, New Mexico Environmental Restoration Operations (ER) Consolidated Quarterly Report (ER Quarterly Report) fulfills all quarterly reporting requirements set forth in the Resource Conservation and Recovery Act Facility Operating Permit and the Compliance Order on Consent.

  6. Activities in Idaho; status of projects, fiscal years 1982-83

    Science.gov (United States)

    Channel, Linda K.

    1982-01-01

    Twenty-three projects were conducted by the Water Resources Division of the U.S. Geological Survey in Idaho during FY 's (fiscal year) 1982-83. These projects were done in cooperation with seven State and local and nine federal agencies. State and local cooperative funding amounted to $566,123 in FY 1982 and $570,000 (projected monies) in FY 1983; Federal funding amounted to $2,083,748 in FY 1982 and $1,656,494 (projected monies) in FY 1983. Eighty-three persons were employed as of September, FY 1982--40 full time and 43 other than full time. Sixty-five persons were employed as of October, FY 1983--35 full time and 30 other than full time. In addition, the Water Resources Division maintains a project office at the Idaho National Engineering Laboratory. Work there is done in cooperation with the U.S. Department of Energy, which provides most of the funding. Some Federal funds are provided for special projects. Projects other than continuing programs for collection of hydrologic data included flood-mapping studies, geothermal-resource investigations, groundwater-quality assessments, basin-and region-wide water-resource investigations , river quality-of-water monitoring studies, volcanic-ash-related studies, groundwater trends and stream gaging-program evaluations, river erosion and sediment-transport studies, water-budget and groundwater-use determinations, and a sole-source aquifer appraisal. (USGS)

  7. Mark Twain National Wildlife Refuge Iowa River Corridor Project [Land Status Map: Sheet 3 of 3

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This map was produced by the Division of Realty to depict landownership at Mark Twain National Wildlife Refuge Iowa River Corridor Project. It was generated from...

  8. Mark Twain National Wildlife Refuge Iowa River Corridor Project [Land Status Map: Sheet 2 of 3

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This map was produced by the Division of Realty to depict landownership at Mark Twain National Wildlife Refuge Iowa River Corridor Project. It was generated from...

  9. Mark Twain National Wildlife Refuge Iowa River Corridor Project [Land Status Map: Sheet 1 of 3

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — This map was produced by the Division of Realty to depict landownership at Mark Twain National Wildlife Refuge Iowa River Corridor Project. It was generated from...

  10. Western Gas Sands Project. Status report, 1 January 1979--31 January 1979

    Energy Technology Data Exchange (ETDEWEB)

    Atkinson, C H

    1979-01-01

    Aim is to increase gas production from the low-permeability gas sands of the western U.S. Progress is reported on: project management, resource assessment, R and D at various facilities, and field tests and demonstrations. (DLC)

  11. Enterprise Level Status and Control of Multi-Satellite Operations Project

    Data.gov (United States)

    National Aeronautics and Space Administration — The objective of this project is to take information from multiple operational environments and securely deliver it in a graphically useful manner to the end user....

  12. Environmental Biosciences Program Quarterly Report

    Energy Technology Data Exchange (ETDEWEB)

    Lawrence C. Mohr, M.D.

    2009-01-30

    Current research projects have focused Environmental Biosciences Program (EBP) talent and resources on providing the scientific basis for risk-based standards, risk-based decision making and the accelerated clean-up of widespread environmental hazards. These hazards include trichloroethylene, low-dose ionizing radiation (gamma and neutron) and alpha radiation from plutonium. Trichloroethylene research has been conducted as a joint collaborative effort with the University of Georgia. Work on the trichloroethylene research projects has been slowed as a result of funding uncertainties. The impact of these funding uncertainties has been discussed with the United States Department of Energy (DOE). Laboratory work has been completed on several trichloroethylene risk assessment projects, and these projects have been brought to a close. Plans for restructuring the performance schedule of the remaining trichloroethylene projects have been submitted to the department. A comprehensive manuscript on the scientific basis of trichloroethylene risk assessment is in preparation. Work on the low-dose radiation risk assessment projects is also progressing at a slowed rate as a result of funding uncertainties. It has been necessary to restructure the proponency and performance schedule of these projects, with the project on Low-Dose Radiation: Epidemiology Risk Models transferred to DOE Office of Science proponency under a separate funding instrument. Research on this project will continue under the provisions of the DOE Office of Science funding instrument, with progress reported in accordance with the requirements of that funding instrument. Progress on that project will no longer be reported in quarterly reports for DE-FC09-02CH11109. Following a meeting at the Savannah River Site on May 8, 2008, a plan was submitted for development of an epidemiological cohort study and prospective medical surveillance system for the assessment of disease rates among workers at the Savannah River

  13. Education, marital status, and risk of hip fractures in older men and women: the CHANCES project.

    Science.gov (United States)

    Benetou, V; Orfanos, P; Feskanich, D; Michaëlsson, K; Pettersson-Kymmer, U; Ahmed, L A; Peasey, A; Wolk, A; Brenner, H; Bobak, M; Wilsgaard, T; Schöttker, B; Saum, K-U; Bellavia, A; Grodstein, F; Klinaki, E; Valanou, E; Papatesta, E-M; Boffetta, P; Trichopoulou, A

    2015-06-01

    The role of socioeconomic status in hip fracture incidence is unclear. In a diverse population of elderly, higher education was found to be associated with lower, whereas living alone, compared to being married/cohabiting, with higher hip fracture risk. Educational level and marital status may contribute to hip fracture risk. The evidence on the association between socioeconomic status and hip fracture incidence is limited and inconsistent. We investigated the potential association of education and marital status with hip fracture incidence in older individuals from Europe and USA. A total of 155,940 participants (79 % women) aged 60 years and older from seven cohorts were followed up accumulating 6456 incident hip fractures. Information on education and marital status was harmonized across cohorts. Hip fractures were ascertained through telephone interviews/questionnaires or through record linkage with registries. Associations were assessed through Cox proportional hazard regression adjusting for several factors. Summary estimates were derived using random effects models. Individuals with higher education, compared to those with low education, had lower hip fracture risk [hazard ratio (HR) = 0.84, 95 % confidence interval (CI) 0.72-0.95]. Respective HRs were 0.97 (95 % CI 0.82-1.13) for men and 0.75 (95 % CI 0.65-0.85) for women. Overall, individuals living alone, especially those aged 60-69 years, compared to those being married/cohabiting, tended to have a higher hip fracture risk (HR = 1.12, 95 % CI 1.02-1.22). There was no suggestion for heterogeneity across cohorts (P heterogeneity > 0.05). The combined data from >150,000 individuals 60 years and older suggest that higher education may contribute to lower hip fracture risk. Furthermore, this risk may be higher among individuals living alone, especially among the age group 60-69 years, when compared to those being married/cohabiting.

  14. P17 - Early Menopause Influences Osteopenic or Osteoporotic Status in Postmenopausal Women: Preliminary Results from the Prof Project

    Science.gov (United States)

    Piscitelli, P.; Rigliano, V.; Neglia, C.; Chitano, G.; Argentiero, A.; Paladini, D.; Mundi, S.; Paladini, L.; Greco, M.; Girasoli, C.; Gianicolo, M. E.; Pantile, V.; Argentiero, D.; De Padova, G.; Nibio, L.; Pansa, L.; Di Giuseppe, P.; Minosi, A.; Cirasino, L.; Laselva, G.; Scialpi, M.; D’Angela, D.; Benvenuto, M.; Brandi, M. L.; Distante, A.

    2010-01-01

    Aims: There is evidence that demographic trends in Southern Apulia are characterised by a huge proportion of elderly people relative to the general population, resulting in an ageing index which is higher than that recorded in other Southern Italian regions and/or sub-regions. Within the PROF (Prevention of Osteoporotic Fractures) project, which aims to foster synergistic efforts between researchers and clinicians, we investigated the correlation between early menopause and osteopenic or osteoporotic status in postmenopausal women by quantitative bone ultrasound evaluation (QUS). Methods: In a period of almost six years (2004–2010), 5665 postmenopausal women (mean age 55, ranging from 39 to 84) were screened by QUS at either the heel or the phalanx. Demographic and anamnestic data were recorded for all the patients, including BMI, nutrition, menopause, physical activity, previous fractures, familial fragility fractures. Three categories of demineralisation were identified: a) Demineralisation, when any T-score <−1.0 SD was observed; b) Severe demineralisation, whenever a T-score <−2.0 was observed, corresponding to a higher risk of fracture; c) Osteoporosis, whenever a T-score <−2.5±0.2 (for the heel) or T-score <−3.2±0.2 (for the phalanx) was observed. Descriptive statistical analyses were performed in order to assess the correlation between early menopause (<45 years of age) and the osteopenic or osteoporotic status of the patients. Results: Of the 5665 subjects examined overall, demineralisation was observed in 4487 subjects (79%), with severe osteopenia or osteoporotic status being documented in 2823 women (50%) and frank osteoporotic status in 846 (15%). In total, of 1169 women reporting an early menopause, 937 showed demineralisation corresponding to at least an osteopenic status (80%). In 605 of these patients (65%), there was a severe osteopenic or osteoporotic status, while 182 women experiencing an early menopause were found to be frankly

  15. The Sydney 2000 World Weather Research Programme Forecast Demonstration Project: Overview and Current Status.

    Science.gov (United States)

    Keenan, T.; Joe, P.; Wilson, J.; Collier, C.; Golding, B.; Burgess, D.; May, P.; Pierce, C.; Bally, J.; Crook, A.; Seed, A.; Sills, D.; Berry, L.; Potts, R.; Bell, I.; Fox, N.; Ebert, E.; Eilts, M.;  O'Loughlin, K.;  Webb, R.;  Carbone, R.;  Browning, K.;  Roberts, R.;  Mueller, C.

    2003-08-01

    The first World Weather Research Programme (WWRP) Forecast Demonstration Project (FDP), with a focus on nowcasting, was conducted in Sydney, Australia, from 4 September to 21 November 2000 during a period associated with the Sydney 2000 Olympic Games. Through international collaboration, nine nowcasting systems from the United States, United Kingdom, Canada, and Australia were deployed at the Sydney Office of the Bureau of Meteorology (BOM) to demonstrate the capability of modern forecast systems and to quantify the associated benefits in the delivery of a real-time nowcast service. On-going verification and impact studies supported by international committees assisted by the WWRP formed an integral part of this project. A description is given of the project, including component systems, the weather, and initial outcomes. Initial results show that the nowcasting systems tested were transferable and able to provide valuable information enhancing BOM nowcasts. The project provided for unprecedented interchange of concepts and ideas between forecasters, researchers, and end users in an operational framework where they all faced common issues relevant to real time nowcast decision making. A training workshop sponsored by the World Meteorological Organization (WMO) was also held in conjunction with the project so that other member nations could benefit from the FDP.

  16. The Cosmetics Europe strategy for animal-free genotoxicity testing: project status up-date.

    Science.gov (United States)

    Pfuhler, S; Fautz, R; Ouedraogo, G; Latil, A; Kenny, J; Moore, C; Diembeck, W; Hewitt, N J; Reisinger, K; Barroso, J

    2014-02-01

    The Cosmetics Europe (formerly COLIPA) Genotoxicity Task Force has driven and funded three projects to help address the high rate of misleading positives in in vitro genotoxicity tests: The completed "False Positives" project optimized current mammalian cell assays and showed that the predictive capacity of the in vitro micronucleus assay was improved dramatically by selecting more relevant cells and more sensitive toxicity measures. The on-going "3D skin model" project has been developed and is now validating the use of human reconstructed skin (RS) models in combination with the micronucleus (MN) and Comet assays. These models better reflect the in use conditions of dermally applied products, such as cosmetics. Both assays have demonstrated good inter- and intra-laboratory reproducibility and are entering validation stages. The completed "Metabolism" project investigated enzyme capacities of human skin and RS models. The RS models were shown to have comparable metabolic capacity to native human skin, confirming their usefulness for testing of compounds with dermal exposure. The program has already helped to improve the initial test battery predictivity and the RS projects have provided sound support for their use as a follow-up test in the assessment of the genotoxic hazard of cosmetic ingredients in the absence of in vivo data. Copyright © 2013 Elsevier Ltd. All rights reserved.

  17. Quarterly report of RCRA groundwater monitoring data for period October 1, 1992--December 31, 1992

    Energy Technology Data Exchange (ETDEWEB)

    1993-04-01

    Hanford Site interim-status groundwater monitoring projects are conducted as either background, indicator parameter evaluation, or groundwater quality assessment monitoring programs as defined in the Resource Conservation and Recovery Act of 1976 (RCRA); and Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities, as amended (40 CFR 265). Compliance with the 40 CFR 265 regulations is required by the Washington Administrative Code (WAC) 173-303. Long-term laboratory contracts were approved on October 22, 1991. DataChem Laboratories of Salt Lake City, Utah, performs the hazardous chemicals analyses for the Hanford Site. Analyses for coliform bacteria are performed by Columbia/Biomedical Laboratories and for dioxin by TMS Analytical Services, Inc. International Technology Analytical Services Richland, Washington performs the radiochemical analyses. This quarterly report contains data that were received prior to March 8, 1993. This report may contain not only data from the October through December quarter but also data from earlier sampling events that were not previously reported.

  18. Status of R&D on Micromegas for Rare Event Searches: The T-REX project

    CERN Document Server

    Irastorza, I G; Cebrián, S; Dafni, T; Fanourakis, G; Ferrer-Ribas, E; Fortuño, D; Esteban, L; Galán, J; García, J A; Gardikiotis, A; Garza, J G; Geralis, T; Giomataris, I; Gómez, H; Herrera, D C; Iguaz, F J; Luzón, G; Mols, J P; Ortiz, A; Papaevangelou, T; Rodríguez, A; Ruz, J; Seguí, L; Tomás, A; Vafeiadis, T; Yildiz, S C

    2011-01-01

    The T-REX project aims at developing novel readout techniques for Time Projection Chambers in experiments searching for rare events. The enhanced performance of the latest Micromegas readouts in issues like energy resolution, gain stability, homogeneity, material budget, combined with low background techniques, is opening new windows of opportunity for their application in this field. Here we review the latest results regarding the use and prospects of Micromegas readouts in axion physics (CAST and the future helioscope), as well as the R&D carried out within NEXT, to search for the neutrinoless double-beta decay.

  19. The Galactic O-Star Spectral Survey (GOSSS) Project status and first results

    CERN Document Server

    Sota, Alfredo; Barbá, Rodolfo H; Walborn, Nolan R; Alfaro, Emilio J; Gamen, Roberto C; Morrell, Nidia I; Arias, Julia I; Ordaz, Miguel Penadés

    2011-01-01

    The Galactic O-Star Spectroscopic Survey (GOSSS) is a project that is observing all known Galactic O stars with B < 13 (~2000 objects) in the blue-violet part of the spectrum with R~2500. It also includes two companion surveys (a spectroscopic one at R~1500 and a high resolution imaging one). It is based on v2.0 of the Galactic O star catalog (v1, Ma\\'iz-Apell\\'aniz et al. 2004; v2, Sota et al. 2008). We have completed the first part of the main project. Here we present results on the first 400 objects of the sample.

  20. Coal Combustion Science quarterly progress report, April--June 1990

    Energy Technology Data Exchange (ETDEWEB)

    Hardesty, D.R. (ed.); Baxter, L.L.; Fletcher, T.H.; Mitchell, R.E.

    1990-11-01

    This document provides a quarterly status report of the Coal Combustion Science Program that is being conducted at the Combustion, Research Facility, Sandia National Laboratories, Livermore, California. Coal devolatilization, coal char combustion, and fate of mineral matter during coal combustion. 56 refs., 25 figs., 13 tabs.

  1. C1-1: Portfolio Management: Using Lean Tools to Support Project Teams with Grant Management

    Science.gov (United States)

    Reinig, Stephen

    2013-01-01

    Background/Aims Group Health Research Institute (GHRI) utilizes Lean tools and techniques to enhance customer service, monitor compliance, and enhance project team interactions and communications. GHRI’s Grants and Contracts Administration (GCA) recently used Lean tools to design and implement a grant “portfolio management” system and process to support Principal Investigators (PIs). The system tracks six key indicators of funded grants: award status, budgetary spend rate, effort reporting, subaward execution, subawardee invoicing, and progress reporting. The process allows issues to be identified, tracked, and resolved early on with the project team before any serious problems arise. Methods GCA conducted a series of stakeholder interviews to determine the viability of quarterly portfolio review meetings. Project teams liked the idea of discussing the PI’s portfolio, but were leery about quarterly meetings. Therefore, we constructed a process that maximized technology and built in flexibility regarding quarter meetings. The six key indicators were selected, defined, and placed on a dashboard in SharePoint. Each PI has a customized SharePoint page with a calendar showing all major grant deadlines and deliverables; a folder of documents related to the rankings and discussion during each quarterly meeting; and an issue tracker to follow-up on team-identified issues and problems requiring attention. Customer satisfaction data was also collected after each initial quarterly meeting. Results As of October 2012, approximately 25 face-to-face meetings and 5 virtual meetings (i.e., materials and links emailed to the project team) have been completed (210 projects and 85 subawards will have been reviewed by the end of 2012). Satisfaction survey data indicates over 75% of team members (22 of 30 individuals) like the face-to-face meetings and hope to continue the quarterly review process. Conclusions The new portfolio management process has been received favorably by

  2. Environmental Restoration Operations Consolidated Quarterly Report: July-September 2016

    Energy Technology Data Exchange (ETDEWEB)

    Cochran, John R. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2017-01-01

    This Environmental Restoration Operations (ER) Consolidated Quarterly Report (ER Quarterly Report) provides the status of ongoing corrective action activities being implemented at Sandia National Laboratories, New Mexico (SNL/NM) during the July, August, and September 2016 quarterly reporting period. The Solid Waste Management Units (SWMUs) and Areas of Concern (AOCs) identified for corrective action at SNL/NM are listed in Table I-1. Sections I.2.1 and I.2.2 summarize the work completed during this quarter. Section I.2.1 summarizes the quarterly activities at sites undergoing corrective action field activities. Field activities are conducted at the three groundwater AOCs (Burn Site Groundwater [BSG AOC], Technical Area [TA]-V Groundwater [TAVG AOC], and Tijeras Arroyo Groundwater [TAG AOC]). Section I.2.2 summarizes quarterly activities at sites where the New Mexico Environment Department (NMED) issued a certificate of completion and the sites are in the corrective action complete (CAC) regulatory process. Currently, SWMUs 8 and 58, 68, 149, 154, and 502 are in the CAC regulatory process. Corrective action activities are deferred at the Long Sled Track (SWMU 83), the Gun Facilities (SWMU 84), and the Short Sled Track (SWMU 240) because these three sites are active mission facilities. These three active sites are located in TA-III.

  3. Planning for sustainability in China's urban development: status and challenges for Dongtan eco-city project.

    Science.gov (United States)

    Cheng, Hefa; Hu, Yuanan

    2010-01-01

    With the rapid urbanization in China, the country faces significant challenges in sustainable urban development and actively explores novel ways to expand urban areas while conserving natural resources. Radical changes in city planning are being made to switch to sustainable development, with new cities being designed to be ecologically friendly guided by principles like carbon neutrality and self-sufficiency. This paper introduces the development of the Dongtan eco-city project on Chongming Island, Shanghai and describes how it addresses issues including energy, water, waste, transportation, ecosystem, and social and economic development in its design. The lessons and challenges of eco-city development based on the Dongtan experience are also discussed. If the vision of a zero-carbon emissions sustainable city is successfully realized, Dongtan will serve as a model for developing similar cities across China and the rest of the developing world. Currently, the development of this project is behind schedule and whether the eco-city plan will materialize or not is in question. Even though the project remains mostly on the drawing boards, the planning and preliminary development of Dongtan eco-city have generated significant enthusiasm for green buildings and influenced plans for other sustainable urban development projects in China.

  4. European seismological data exchange, access and processing: current status of the Research Infrastructure project NERIES

    Science.gov (United States)

    Giardini, D.; van Eck, T.; Bossu, R.; Wiemer, S.

    2009-04-01

    The EC Research infrastructure project NERIES, an Integrated Infrastructure Initiative in seismology for 2006-2010 has passed its mid-term point. We will present a short concise overview of the current state of the project, established cooperation with other European and global projects and the planning for the last year of the project. Earthquake data archiving and access within Europe has dramatically improved during the last two years. This concerns earthquake parameters, digital broadband and acceleration waveforms and historical data. The Virtual European Broadband Seismic Network (VEBSN) consists currently of more then 300 stations. A new distributed data archive concept, the European Integrated Waveform Data Archive (EIDA), has been implemented in Europe connecting the larger European seismological waveform data. Global standards for earthquake parameter data (QuakeML) and tomography models have been developed and are being established. Web application technology has been and is being developed to make a jump start to the next generation data services. A NERIES data portal provides a number of services testing the potential capacities of new open-source web technologies. Data application tools like shakemaps, lossmaps, site response estimation and tools for data processing and visualisation are currently available, although some of these tools are still in an alpha version. A European tomography reference model will be discussed at a special workshop in June 2009. Shakemaps, coherent with the NEIC application, are implemented in, among others, Turkey, Italy, Romania, Switzerland, several countries. The comprehensive site response software is being distributed and used both inside and outside the project. NERIES organises several workshops inviting both consortium and non-consortium participants and covering a wide range of subjects: ‘Seismological observatory operation tools', ‘Tomography', ‘Ocean bottom observatories', 'Site response software training

  5. Advanced Reactor Safety Research Division. Quarterly progress report, January 1-March 31, 1980

    Energy Technology Data Exchange (ETDEWEB)

    Agrawal, A.K.; Cerbone, R.J.; Sastre, C.

    1980-06-01

    The Advanced Reactor Safety Research Programs quarterly progress report describes current activities and technical progress in the programs at Brookhaven National Laboratory sponsored by the USNRC Division of Reactor Safety Research. The projects reported each quarter are the following: HTGR Safety Evaluation, SSC Code Development, LMFBR Safety Experiments, and Fast Reactor Safety Code Validation.

  6. Advanced Reactor Safety Research Division. Quarterly progress report, April 1-June 30, 1980

    Energy Technology Data Exchange (ETDEWEB)

    Romano, A.J.

    1980-01-01

    The Advanced Reactor Safety Research Programs Quarterly Progress Report describes current activities and technical progress in the programs at Brookhaven National Laboratory sponsored by the USNRC Division of Reactor Safety Research. The projects reported each quarter are the following: HTGR safety evaluation, SSC Code Development, LMFBR Safety Experiments, and Fast Reactor Safety Code Validation.

  7. Water Reactor Safety Research Division. Quarterly progress report, April 1-June 30, 1980

    Energy Technology Data Exchange (ETDEWEB)

    Abuaf, N.; Levine, M.M.; Saha, P.; van Rooyen, D.

    1980-08-01

    The Water Reactor Safety Research Programs quarterly report describes current activities and technical progress in the programs at Brookhaven National Laboratory sponsored by the USNRC Division of Reactor Safety Research. The projects reported each quarter are the following: LWR Thermal Hydraulic Development, Advanced Code Evlauation, TRAC Code Assessment, and Stress Corrosion Cracking of PWR Steam Generator Tubing.

  8. NESC 1 Project - Status Report after the spinning of the NESC cylinder

    Energy Technology Data Exchange (ETDEWEB)

    Wintle, J.B. [Welding Inst., Abington (United Kingdom); Hurst, R. [Commission of the European Communities, Petten (Netherlands). Inst. for Advanced Materials; Hemsworth, B. [Nuclear Installations Inspectorate, Liverpool (United Kingdom)

    1998-11-01

    The International Network for Evaluating Steel Components (NESC) addresses issues relating to the validation of the entire process of structural integrity assessment. The first NESC Project is providing a unique insight into the relative roles which NDT, material properties, instrumentation measurements, and stress and fracture analyses can make in providing a robust safety case for pressurised thermal shock of a thick reactor pressure vessel of aged material containing defects. NESC I is unique insofar as the NDT and the analyses of stress and fracture have been carried out without exact knowledge of the defects as is the case in the real world. The project reached a major milestone on 20 March 1997 with the completion of the thermal shock test using the AEA Technology Spinning Cylinder facility at Risley. Early indications suggest that crack propagation has occurred in both the sub clad and through clad defects. (orig.)

  9. Digital Radiography and Computed Tomography Project -- Fully Integrated Linear Detector ArrayStatus Report

    Energy Technology Data Exchange (ETDEWEB)

    Tim Roney; Robert Seifert; Bob Pink; Mike Smith

    2011-09-01

    The field-portable Digital Radiography and Computed Tomography (DRCT) x-ray inspection systems developed for the Project Manager for NonStockpile Chemical Materiel (PMNSCM) over the past 13 years have used linear diode detector arrays from two manufacturers; Thomson and Thales. These two manufacturers no longer produce this type of detector. In the interest of insuring the long term viability of the portable DRCT single munitions inspection systems and to improve the imaging capabilities, this project has been investigating improved, commercially available detectors. During FY-10, detectors were evaluated and one in particular, manufactured by Detection Technologies (DT), Inc, was acquired for possible integration into the DRCT systems. The remainder of this report describes the work performed in FY-11 to complete evaluations and fully integrate the detector onto a representative DRCT platform.

  10. Present status and future prospect for national project on lithium batteries

    Science.gov (United States)

    Kodama, Teruo; Sakaebe, Hikari

    Sales of lithium-ion battery in Japan increased so sharply since the battery was on sale in 1992. `Dispersed-type Battery Energy Storage Technology' of New Sunshine (AIST) program have stimulated R&D of lithium batteries in Japan. In this project on lithium batteries, Osaka National Research Institute (ONRI) plays a main role by coordinating the project from a neutral standpoint and supporting it with a basic research for battery material. A research background for electrochemical devices and research activity in the field of lithium battery at ONRI are introduced. Then, future prospect of a role of battery in a society in the next century is described regarding to an `environment' and `human being'.

  11. Western Gas Sands Project. Status report, 1 March 1979--31 March 1979

    Energy Technology Data Exchange (ETDEWEB)

    None

    1979-01-01

    Progress of the government-sponsored projects directed toward increasing gas production from low-permeability gas sands of the western United States is summarized. During March, National Laboratories and Energy Technology Centers generally progressed on schedule. Bartlesville Energy Technology Center continued work on fracture conductivity, rock-fluid interaction, and log evaluation techniques. Theoretical and experimental work on hydraulic fracturing mechanics and analysis of well test data continued at Lawrence Livermore Laboratory. Sandia Laboratories completed preparations for the NTS evaluation test of the borehole seismic system. M.D. Wood, Inc. monitored the formation of a hydraulic fracture in the Wattenburg gas field, Weld County, Colorado. Measurement of bottom-hole pressure in the Miller No. 1 and Sprague No. 1 wells for the CIG cyclic gas injection project continued. The Mitchell Energy Corporation Muse--Duke No. 1 was flowing 4,000 MCFD in March. Efforts to clean out Mobil's PCU F31-13G well continued.

  12. Development Status and Plans of the Advanced Thermoelectric Converter (ATEC) Project

    Science.gov (United States)

    Ewell, Richard; Caillat, Thierry

    2008-01-01

    Advances in thermoelectric materials with high ZT in mid-90's, revived interest in advanced thermoelectric materials at DOE, DOD and NASA NASA. JPL, in collaboration with Universities, identified promising high temperature thermoelectric materials for potential use in next generation RTGs nder DOD and NASA funding (1995 to 2005). Based on these advances the ATEC project was initiated in January 2006 to develop an advanced converter by 2010 (10-12% couple efficiency). ATEC is a technology maturation project with an off-ramp to a proposed Advanced RTG (ARTG) providing 6-8 W/kg and 8-10% system efficiency to support potential future SMD missions as early as 2017. In addition, work is continuing on advancing the TE materials technology to support development of an RTG with 12-14 W/kg and 15 to 20% efficiency by 2020.

  13. Conservation status of polar bears (Ursus maritimus) in relation to projected sea-ice declines

    Science.gov (United States)

    Akçakaya, H. Resit; Amstrup, Steven C.; Atwood, Todd C.; Lunn, Nicholas J.; Obbard, Martyn; Stern, Harry; Thiemann, Gregory W.; Wiig, Øystein

    2016-01-01

    Loss of Arctic sea ice owing to climate change is the primary threat to polar bears throughout their range. We evaluated the potential response of polar bears to sea-ice declines by (i) calculating generation length (GL) for the species, which determines the timeframe for conservation assessments; (ii) developing a standardized sea-ice metric representing important habitat; and (iii) using statistical models and computer simulation to project changes in the global population under three approaches relating polar bear abundance to sea ice. Mean GL was 11.5 years. Ice-covered days declined in all subpopulation areas during 1979–2014 (median −1.26 days year−1). The estimated probabilities that reductions in the mean global population size of polar bears will be greater than 30%, 50% and 80% over three generations (35–41 years) were 0.71 (range 0.20–0.95), 0.07 (range 0–0.35) and less than 0.01 (range 0–0.02), respectively. According to IUCN Red List reduction thresholds, which provide a common measure of extinction risk across taxa, these results are consistent with listing the species as vulnerable. Our findings support the potential for large declines in polar bear numbers owing to sea-ice loss, and highlight near-term uncertainty in statistical projections as well as the sensitivity of projections to different plausible assumptions. PMID:27928000

  14. Conservation status of polar bears (Ursus maritimus) in relation to projected sea-ice declines.

    Science.gov (United States)

    Regehr, Eric V; Laidre, Kristin L; Akçakaya, H Resit; Amstrup, Steven C; Atwood, Todd C; Lunn, Nicholas J; Obbard, Martyn; Stern, Harry; Thiemann, Gregory W; Wiig, Øystein

    2016-12-01

    Loss of Arctic sea ice owing to climate change is the primary threat to polar bears throughout their range. We evaluated the potential response of polar bears to sea-ice declines by (i) calculating generation length (GL) for the species, which determines the timeframe for conservation assessments; (ii) developing a standardized sea-ice metric representing important habitat; and (iii) using statistical models and computer simulation to project changes in the global population under three approaches relating polar bear abundance to sea ice. Mean GL was 11.5 years. Ice-covered days declined in all subpopulation areas during 1979-2014 (median -1.26 days year(-1)). The estimated probabilities that reductions in the mean global population size of polar bears will be greater than 30%, 50% and 80% over three generations (35-41 years) were 0.71 (range 0.20-0.95), 0.07 (range 0-0.35) and less than 0.01 (range 0-0.02), respectively. According to IUCN Red List reduction thresholds, which provide a common measure of extinction risk across taxa, these results are consistent with listing the species as vulnerable. Our findings support the potential for large declines in polar bear numbers owing to sea-ice loss, and highlight near-term uncertainty in statistical projections as well as the sensitivity of projections to different plausible assumptions.

  15. The WEST project: Current status of the ITER-like tungsten divertor

    Energy Technology Data Exchange (ETDEWEB)

    Missirlian, M., E-mail: marc.missirlian@cea.fr; Bucalossi, J.; Corre, Y.; Ferlay, F.; Firdaouss, M.; Garin, P.; Grosman, A.; Guilhem, D.; Gunn, J.; Languille, P.; Lipa, M.; Richou, M.; Tsitrone, E.

    2014-10-15

    Highlights: • We presented the ITER-like W components occurred for the WEST divertor. • The main features including key elements of the design were detailed. • The main results of studies investigating the integration constraints or issues were reported. • The WEST ITER-like divertor design reached a mature stage to enable the launching of the procurement phase. - Abstract: The WEST (W – for tungsten – Environment in Steady-state Tokamak) project is an upgrade of Tore Supra from a limiter based tokamak with carbon PFCs into an X-point divertor tokamak with full-tungsten armour while keeping its long discharge capability. The WEST project will primarily offer the key capability of testing for the first time the ITER technology in real plasma environment. In particular, the main divertor (i.e. the lower divertor) of the WEST project will be based on actively cooled tungsten monoblock components and will follow as closely as possible the design and the assembling technology, foreseen for the ITER divertor units. The current design of WEST ITER-like tungsten divertor has now reached a mature stage following the 2013 WEST Final Design Review. This paper presents the key elements of the design, reports the technological requirements and reviews the main design and integration issues.

  16. Imperial Valley Environmental Project: quarterly data report

    Energy Technology Data Exchange (ETDEWEB)

    Nyholm, R.A.; Anspaugh, L.R. (comps.)

    1977-04-13

    This is a catalog of all samples which have been collected and the presently available results of chemical and other analyses. Types covered include: air quality, water quality, ecosystem quality, subsidence and seismicity, remotely sensed data, socioeconomic effects, and measurements of radioactivity. (MHR)

  17. ARRA NEPA Quarterly Report- First Report: DOJ

    Data.gov (United States)

    Council on Environmental Quality, Executive Office of the President — Reports prepared by the Departments and Agencies on status of NEPA progress for activities and projects funded under Division A of the American Recovery and...

  18. ARRA NEPA Quarterly Report- First Report: DOE

    Data.gov (United States)

    Council on Environmental Quality, Executive Office of the President — Reports prepared by the Departments and Agencies on status of NEPA progress for activities and projects funded under Division A of the American Recovery and...

  19. ARRA NEPA Quarterly Report- Second Report: DOE

    Data.gov (United States)

    Council on Environmental Quality, Executive Office of the President — Reports prepared by the Departments and Agencies on status of NEPA progress for activities and projects funded under Division A of the American Recovery and...

  20. Status and Perceptions of the Application of Building Information Modeling for Improved Building Projects Delivery in Nigeria

    Directory of Open Access Journals (Sweden)

    S.C Ugochukwu

    2015-11-01

    Full Text Available Building Information Modeling (BIM is a new and innovative approach to building design, construction, and management. It is a cutting-edge, state of the art technology that is not only transforming, but improving the building delivery/production process in developed countries of the world. Sadly, Nigeria is yet to adopt this revolutionary technology in her construction industry. This study thus, sought to evaluate the present status of application of BIM in building projects in Nigeria, with a view to betoning its importance in improving the present state of building delivery in the country. This was effected by means of a field survey of building professionals in which their perceptions were analyzed, based on a structured questionnaire administration; in order to elicit their level of awareness of BIM application, determine their extent of participation in BIM projects, identify and rank the most suitable procurement method that encourages BIM application, the barriers to the application of BIM and the benefits of BIM application to building delivery in Nigeria. Results/Findings revealed that knowledge of BIM application among professionals is very poor (33%, participation/use of BIM in projects is non-existent, the collaborative method of procurement best supports BIM application, lack of awareness remains the major barrier to BIM application, while simultaneous access to project database by stakeholders is the highest ranked benefit of BIM application. The study concludes that Nigeria still has a long way to go in understanding, embracing and applying BIM to improve the traditional and stagnant state of her building delivery process. Hence, all hands should be on deck; the government, professional bodies, construction organizations and the academia to ensure that BIM becomes a priority with respect to legislations, training, research and use in the Nigerian building industry

  1. Status of the ANAIS Dark Matter Project at the Canfranc Underground Laboratory

    CERN Document Server

    Amare, J; Cuesta, C; Garcia, E; Martinez, M; Olivan, M A; Ortigoza, Y; de Solorzano, A Ortiz; Pobes, C; Puimedon, J; Sarsa, M L; Villar, J A; Villar, P

    2015-01-01

    The ANAIS experiment aims at the confirmation of the DAMA/LIBRA signal. A detailed analysis of two NaI(Tl) crystals of 12.5 kg each grown by Alpha Spectra will be shown: effective threshold at 1 keVee is at reach thanks to outstanding light collection and robust PMT noise filtering protocols and the measured background is well understood down to 3 keVee, having quantified K, U and Th content and cosmogenic activation in the crystals. A new detector was installed in Canfranc in March 2015 together with the two previous modules and preliminary characterization results will be presented. Finally, the status and expected sensitivity of the full experiment with 112 kg will be reviewed.

  2. Radiological status of the ground water beneath the Hanford project, January-December 1979

    Energy Technology Data Exchange (ETDEWEB)

    Eddy, P.A.; Wilbur, J.S.

    1980-04-01

    Operations on the Hanford Site since 1944 have resulted in discharge of large volumes of process cooling water and low-level liquid radioactive waste to the ground. Radioactivity and chemical substances have been carried with these discharges and have reached the Hanford ground water. For may years wells have been used as groundwater sampling structures to gather data on the distribution and movement of these discharges as they interact with the unconfined ground water beneath the site. During 1979, 317 wells were sampled on various frequencies from weekly to annually. This report is one of a series prepared annually to document the evaluation of the status of ground water on the Hanford Site. Data collected during 1979 describe the movement of radionuclide (Tritium and Beta) and nitrate plumes that respond to the influence of groundwater flow, ionic dispersion and radioactive decay.

  3. American Dietetic Association's Standardized Nutrition Language: Project logic model and current status.

    Science.gov (United States)

    Jenkins, Melinda; Myers, Esther; Charney, Pam; Escott-Stump, Sylvia

    2006-01-01

    Standardized terminology and digital sources of evidence are essential for evidence-based practice. Dieticians desire concise and consistent documentation of nutrition diagnoses, interventions and outcomes that will be fit for electronic health records. Building on more than 5 years of work to generate the Nutrition Care Process and Model as a road map to quality nutrition care and outcomes, and recognizing existing standardized languages serving other health professions, a task force of the American Dietetic Association (ADA) has begun to develop and disseminate standardized nutrition language. This paper will describe the group's working logic model, the Nutrition Care Process, and the current status of the nutrition language with comparisons to nursing process and terminology.

  4. Status of the ion sources developments for the Spiral2 project at GANIL

    Energy Technology Data Exchange (ETDEWEB)

    Leherissier, P.; Bajeat, O.; Barue, C.; Canet, C.; Dubois, M.; Dupuis, M.; Flambard, J. L.; Frigot, R.; Jardin, P.; Leboucher, C.; Lemagnen, F.; Maunoury, L.; Osmond, B.; Pacquet, J. Y.; Pichard, A. [GANIL, Grand Accelerateur National d' Ions Lourds, CEA-DSM/CNRS-IN2P3, Bvd H. Becquerel, BP 55027 14076 Caen Cedex 5 (France); Thuillier, T. [LPSC, Universite Joseph Fourier Grenoble 1, CNRS/IN2P3, Institut Polytechnique de Grenoble, Grenoble (France); Peaucelle, C. [IPNL, Universite de Lyon, Universite de Lyon 1, CNRS/IN2P3, Villeurbanne (France)

    2012-02-15

    The SPIRAL 2 facility is now under construction and will deliver either stable or radioactive ion beams. First tests of nickel beam production have been performed at GANIL with a new version of the large capacity oven, and a calcium beam has been produced on the heavy ion low energy beam transport line of SPIRAL 2, installed at LPSC Grenoble. For the production of radioactive beams, several target/ion-source systems (TISSs) are under development at GANIL as the 2.45 GHz electron cyclotron resonance ion source, the surface ionization source, and the oven prototype for heating the uranium carbide target up to 2000 deg. C. The existing test bench has been upgraded for these developments and a new one, dedicated for the validation of the TISS before mounting in the production module, is under design. Results and current status of these activities are presented.

  5. Status of the ion sources developments for the Spiral2 project at GANILa)

    Science.gov (United States)

    Lehérissier, P.; Bajeat, O.; Barué, C.; Canet, C.; Dubois, M.; Dupuis, M.; Flambard, J. L.; Frigot, R.; Jardin, P.; Leboucher, C.; Lemagnen, F.; Maunoury, L.; Osmond, B.; Pacquet, J. Y.; Pichard, A.; Thuillier, T.; Peaucelle, C.

    2012-02-01

    The SPIRAL 2 facility is now under construction and will deliver either stable or radioactive ion beams. First tests of nickel beam production have been performed at GANIL with a new version of the large capacity oven, and a calcium beam has been produced on the heavy ion low energy beam transport line of SPIRAL 2, installed at LPSC Grenoble. For the production of radioactive beams, several target/ion-source systems (TISSs) are under development at GANIL as the 2.45 GHz electron cyclotron resonance ion source, the surface ionization source, and the oven prototype for heating the uranium carbide target up to 2000 °C. The existing test bench has been upgraded for these developments and a new one, dedicated for the validation of the TISS before mounting in the production module, is under design. Results and current status of these activities are presented.

  6. Status of the ion sources developments for the Spiral2 project at GANIL.

    Science.gov (United States)

    Lehérissier, P; Bajeat, O; Barué, C; Canet, C; Dubois, M; Dupuis, M; Flambard, J L; Frigot, R; Jardin, P; Leboucher, C; Lemagnen, F; Maunoury, L; Osmond, B; Pacquet, J Y; Pichard, A; Thuillier, T; Peaucelle, C

    2012-02-01

    The SPIRAL 2 facility is now under construction and will deliver either stable or radioactive ion beams. First tests of nickel beam production have been performed at GANIL with a new version of the large capacity oven, and a calcium beam has been produced on the heavy ion low energy beam transport line of SPIRAL 2, installed at LPSC Grenoble. For the production of radioactive beams, several target∕ion-source systems (TISSs) are under development at GANIL as the 2.45 GHz electron cyclotron resonance ion source, the surface ionization source, and the oven prototype for heating the uranium carbide target up to 2000 °C. The existing test bench has been upgraded for these developments and a new one, dedicated for the validation of the TISS before mounting in the production module, is under design. Results and current status of these activities are presented.

  7. A cientificidade das técnicas projetivas em debate The scientific status of projective techniques in discussion

    Directory of Open Access Journals (Sweden)

    Anna Elisa de Villemor-Amaral

    2006-12-01

    Full Text Available O objetivo deste trabalho é rever uma série especial de artigos antagônicos sobre a validade e o status científico dos métodos projetivos, uma vez que o foco dos debates atuais recai novamente sobre o mérito das técnicas projetivas em contraposição às objetivas, principalmente no que diz respeito ao pouco rigor metodológico nos estudos de validação e ausência de validade incremental, o que, conseqüentemente, repercute na credibilidade dos profissionais e pesquisadores que as utilizam. Neste artigo, dá-se destaque ao que há de procedente em tais discussões, bem como nas distorções ou falácias geradas nesta última década sobre os três procedimentos mais utilizados para avaliação da personalidade, no Brasil e exterior: o Método de Rorschach no Sistema Compreensivo, RCS; o Teste de Apercepção Temática, TAT e o Desenho da Figura Humana, DFH. Os referenciais apresentados sobre a utilidade clínica e diagnóstica desses instrumentos mostram-se igualmente úteis na ponderação de estudos e na discussão de questões relativas às técnicas projetivas de modo geral.The aim of this paper is to review and discuss a special series of antagonistic articles about the scientific status of the projective methods for personality assessment since the focus of the current debates has fallen again into the merit of the projectives in contraposition to the objective techniques. The critics are mainly in respect to the little methodologic procedures in the validation studies as well the absence of incremental validity for the projective methods, what consequently reverberates in the credibility of the professionals and researchers who use them. In this circumstances, this work emphasizes the positive aspects on the controversial as well the distortions or fallacies generated in this last decade about the three used procedures for personality assessment, in Brazil and exterior: the Method of Rorschach in the Comprehensive System, RCS

  8. Metallurgical Laboratory Hazardous Waste Management Facility groundwater monitoring report. Second quarter 1994

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-01

    During second quarter 1994, samples from AMB groundwater monitoring wells at the Metallurgical Laboratory Hazardous Waste Management Facility were analyzed for selected heavy metals, indicator parameters, radionuclides, volatile organic compounds, and other constituents. Three parameters exceeded standards during the quarter. As in previous quarters, tetrachloroethylene and trichloroethylene exceeded final Primary Drinking Water Standards. Total organic halogens exceeded the Savannah River Site (SRS) Flag 2 criteria in two of the wells. Groundwater flow direction and rate in the M-Area Aquifer Zone were similar to previous quarters. Conditions affecting determination of groundwater flow directions and rates in the Upper Lost Lake Aquifer Zone, Lower Lost Lake Aquifer Zone, and the Middle Sand Aquifer Zone of the Crouch Branch Confining Unit were also similar to previous quarters. During second quarter 1994, SRS received SCDHEC approval for five point-of-compliance wells and two plume definition wells near the Met Lab HWMF. Field work has begun on this project.

  9. P15 - Reduced Physical Activity Correlates with Osteopenic or Osteoporotic Status in Postmenopausal Women: Preliminary Results from the Prof Project

    Science.gov (United States)

    Piscitelli, P.; Coli, G.; Argentiero, A.; Neglia, C.; Chitano, G.; Paladini, D.; Mundi, S.; Paladini, L.; Greco, M.; Girasoli, C.; Gianicolo, M. E.; Pantile, V.; Argentiero, D.; De Padova, G.; Pansa, L.; Nibio, L.; Di Giuseppe, P.; Minosi, A.; Cirasino, L.; Laselva, G.; Scialpi, M.; Benvenuto, M.; D’Angela, D.; Brandi, M. L.; Distante, A.

    2010-01-01

    Aims: Italy has a considerable yearly incidence of osteoporotic fractures: about 300,000. In this context, preventive strategies are based mainly on early identification of people at higher risk of fractures and of clinical risk factors. Within the PROF (Prevention of Osteoporotic Fractures) project, i.e. a synergic effort of researchers and clinicians aimed at preventing osteoporotic fractures in Southern Apulia (Salento), a region with an increasing number of elderly people, we investigated the correlation between reduced physical activity and osteopenic or osteoporotic status in postmenopausal women. Methods: During the years 2009–2010, 5665 postmenopausal women (mean age 62 years, range 39 to 86) underwent quantitative bone ultrasound (QUS) measurement at the heel and phalanx. Demographic and anamnestic data were recorded for all the patients, including BMI, nutrition, menopause, physical activity, previous fractures, familial fragility fractures. Three demineralisation categories were identified a priori: a) Demineralisation, when any T-score <−1.0 SD was observed; b) Severe demineralisation, whenever a T-score <−2.0 was observed, corresponding to a higher risk of fracture; c) Osteoporosis, whenever a T-score <−2.5±0.2 (for the heel) or T-score <−3.2±0.2 (for the phalanx) was observed. Descriptive statistical analyses were performed in order to assess the correlation between low physical activity (patients declaring themselves to be completely sedentary) and osteopenic or osteoporotic status. Results: Of the 5665 women, demineralisation was observed in 4487 patients (79%), corresponding to severe osteopenia or osteoporotic status in 2823 women (50% of all the examined subjects) and frank osteoporosis in 846 patients (15%). In total, of the 1255 women with a clinical history of reduced physical activity, 1058 (84.3%) presented demineralisation corresponding at least to an osteopenic status. In addition, demineralisation typical of severe osteopenia

  10. Status and understanding of groundwater quality in the Sierra Nevada Regional study unit, 2008: California GAMA Priority Basin Project

    Science.gov (United States)

    Fram, Miranda S.; Belitz, Kenneth

    2014-01-01

    Groundwater quality in the Sierra Nevada Regional (SNR) study unit was investigated as part of the California State Water Resources Control Board’s Groundwater Ambient Monitoring and Assessment Program Priority Basin Project. The study was designed to provide statistically unbiased assessments of the quality of untreated groundwater within the primary aquifer system of the Sierra Nevada. The primary aquifer system for the SNR study unit was delineated by the depth intervals over which wells in the State of California’s database of public drinking-water supply wells are open or screened. Two types of assessments were made: (1) a status assessment that described the current quality of the groundwater resource, and (2) an evaluation of relations between groundwater quality and potential explanatory factors that represent characteristics of the primary aquifer system. The assessments characterize untreated groundwater quality, rather than the quality of treated drinking water delivered to consumers by water distributors.

  11. Status of the SPES project, a new tool for fundamental and apply science studies with exotic ion beams at LNL

    Energy Technology Data Exchange (ETDEWEB)

    Napoli, D. R., E-mail: napoli@lnl.infn.it; Andrighetto, A.; Antonini, P.; Benini, D.; Bermudez, J.; Bisoffi, G.; Boratto, E.; Bortolato, D.; Calderolla, M.; Calore, A.; Campo, D.; Carturan, S.; Cinausero, M.; Comunian, M.; Corradetti, S.; De Angelis, G.; De Ruvo, P. L.; Esposito, J.; Ferrari, L.; Galatá, A. [INFN - Laboratori Nazionali di Legnaro, Viale dell’Università 2, I-35020 Legnaro (PD) (Italy); and others

    2016-07-07

    SPES, a new accelerator facility for both the production of exotic ion beams and radio-pharmaceuticals, is presently being installed at the Laboratori Nazionali di Legnaro in Italy (LNL). The new cyclotron, which will provide high intensity proton beams for the production of the rare isotopes, has been installed and is now in the commissioning phase. We present here the status of the part of the project devoted to the production and acceleration of fission fragments created in the interaction of an intense proton beam on a production target of UCx. The expected SPES radioactive beams intensities, their quality and their maximum energies (up to 11 MeV/A for A=130) will permit to perform forefront research in nuclear structure and nuclear dynamics far from the stability valley. Another low energy section of the facility is foreseen for new and challenging research, both in the nuclear physics and in the material science frameworks.

  12. Status of groundwater quality in the San Fernando--San Gabriel study unit, 2005--California GAMA Priority Basin Project

    Science.gov (United States)

    Land, Michael; Kulongoski, Justin T.; Belitz, Kenneth

    2012-01-01

    Groundwater quality in the approximately 460-square-mile San Fernando--San Gabriel (FG) study unit was investigated as part of the Priority Basin Project of the Groundwater Ambient Monitoring and Assessment (GAMA) Program. The study area is in Los Angeles County and includes Tertiary-Quaternary sedimentary basins situated within the Transverse Ranges of southern California. The GAMA Priority Basin Project is being conducted by the California State Water Resources Control Board in collaboration with the U.S. Geological Survey (USGS) and the Lawrence Livermore National Laboratory. The GAMA FG study was designed to provide a spatially unbiased assessment of the quality of untreated (raw) groundwater in the primary aquifer systems (hereinafter referred to as primary aquifers) throughout California. The assessment is based on water-quality and ancillary data collected in 2005 by the USGS from 35 wells and on water-quality data from the California Department of Public Health (CDPH) database. The primary aquifers were defined by the depth interval of the wells listed in the CDPH database for the FG study unit. The quality of groundwater in primary aquifers may be different from that in the shallower or deeper water-bearing zones; shallow groundwater may be more vulnerable to surficial contamination. This study assesses the status of the current quality of the groundwater resource by using data from samples analyzed for volatile organic compounds (VOCs), pesticides, and naturally occurring inorganic constituents, such as major ions and trace elements. This status assessment is intended to characterize the quality of groundwater resources in the primary aquifers of the FG study unit, not the treated drinking water delivered to consumers by water purveyors.

  13. submitter Status of the Demonstrator Magnets for the EuCARD-2 Future Magnets Project

    CERN Document Server

    Kirby, G; Badel, A; Bajko, M; Ballarino, A; Bottura, L; Dhalle, M; Durante, M; Fazilleau, P; Fleiter, J; Goldacker, W; Haro, E; Himbele, J; Kario, A; Langeslag, S; Lorin, C; Murtzomaki, J; van Nugteren, J; de Rijk, G; Salmi, T; Senatore, C; Stenvall, A; Tixador, P; Usoskin, A; Volpini, G; Yang, Y; Zangenberg, N

    2016-01-01

    EuCARD-2 is a project partly supported by FP7 European Commission aiming at exploring accelerator magnet technology for 20-T dipole operating field. The EuCARD-2 collaboration is liaising with similar programs for high-field magnets in the U.S. and Japan. EuCARD-2 focuses, through the work package 10 “future magnets,” on the development of a 10-kA-class superconducting high-current-density cable suitable for accelerator magnets, for a 5-T stand-alone dipole of 40-mm bore and about 1-m length. After stand-alone testing, the magnet will be inserted in a large bore background dipole, 10-18 T. This paper reports on the design and development of models, which are called Feather0, wound with REBCO Roebel cable. Based on aligned block design to take advantage of the anisotropy of the REBCO tapes, Feather0 is a precursor of Feather2, which should reach the project goals in 2016. Feather0 is planned to be tested both in stand alone and as an insert mounted in the CERN Fresca facility providing 10-T background fiel...

  14. The first pilot project of the consortium for top-down proteomics: A status report

    Energy Technology Data Exchange (ETDEWEB)

    Dang, Xibei [Ion Cyclotron Resonance Program, National High Magnetic Field Laboratory, Florida State University, Tallahassee FL USA; Department of Chemistry and Biochemistry, Florida State University, Tallahassee FL USA; Scotcher, Jenna [Ion Cyclotron Resonance Program, National High Magnetic Field Laboratory, Florida State University, Tallahassee FL USA; Wu, Si [Environmental Molecular Sciences Laboratory, Pacific Northwest National Laboratory, Richland WA USA; Chu, Rosalie K. [Environmental Molecular Sciences Laboratory, Pacific Northwest National Laboratory, Richland WA USA; Tolić, Nikola [Environmental Molecular Sciences Laboratory, Pacific Northwest National Laboratory, Richland WA USA; Ntai, Ioanna [Departments of Chemistry and Molecular Biosciences and the Proteomics Center of Excellence, Northwestern University, Evanston IL USA; Thomas, Paul M. [Departments of Chemistry and Molecular Biosciences and the Proteomics Center of Excellence, Northwestern University, Evanston IL USA; Fellers, Ryan T. [Departments of Chemistry and Molecular Biosciences and the Proteomics Center of Excellence, Northwestern University, Evanston IL USA; Early, Bryan P. [Departments of Chemistry and Molecular Biosciences and the Proteomics Center of Excellence, Northwestern University, Evanston IL USA; Zheng, Yupeng [Departments of Chemistry and Molecular Biosciences and the Proteomics Center of Excellence, Northwestern University, Evanston IL USA; Durbin, Kenneth R. [Departments of Chemistry and Molecular Biosciences and the Proteomics Center of Excellence, Northwestern University, Evanston IL USA; LeDuc, Richard D. [NIH/NCRR Mass Spectrometry Resource, Washington University in St. Louis, St. Louis MO USA; Wolff, Jeremy J. [Bruker Daltonics, Billerica MA USA; Thompson, Christopher J. [Bruker Daltonics, Billerica MA USA; Pan, Jingxi [UVic-Genome BC Proteomics Centre, Department of Biochemistry and Microbiology, University of Victoria, Victoria BC Canada; Han, Jun [UVic-Genome BC Proteomics Centre, Department of Biochemistry and Microbiology, University of Victoria, Victoria BC Canada; Shaw, Jared B. [Department of Chemistry, University of Texas, Austin TX USA; Salisbury, Joseph P. [Departments of Chemistry and Pharm. Sci., Barnett Institute, Northeastern University, Boston MA USA; Easterling, Michael [Bruker Daltonics, Billerica MA USA; Borchers, Christoph H. [UVic-Genome BC Proteomics Centre, Department of Biochemistry and Microbiology, University of Victoria, Victoria BC Canada; Brodbelt, Jennifer S. [Department of Chemistry, University of Texas, Austin TX USA; Agar, Jeffery N. [Departments of Chemistry and Pharm. Sci., Barnett Institute, Northeastern University, Boston MA USA; Paša-Tolić, Ljiljana [Environmental Molecular Sciences Laboratory, Pacific Northwest National Laboratory, Richland WA USA; Kelleher, Neil L. [Departments of Chemistry and Molecular Biosciences and the Proteomics Center of Excellence, Northwestern University, Evanston IL USA; Young, Nicolas L. [Ion Cyclotron Resonance Program, National High Magnetic Field Laboratory, Florida State University, Tallahassee FL USA

    2014-04-14

    Pilot Project #1—the identification and characterization of human histone H4 proteoforms by top-down MS—is the first project launched by the Consortium for Top-Down Proteomics (CTDP) to refine and validate top-down MS. Within the initial results from seven participating laboratories, all reported the probability-based identification of human histone H4 (UniProt accession P62805) with expectation values ranging from 10-13 to 10-105. Regarding characterization, a total of 74 proteoforms were reported, with 21 done so unambiguously; one new PTM, K79ac, was identified. Inter-laboratory comparison reveals aspects of the results that are consistent, such as the localization of individual PTMs and binary combinations, while other aspects are more variable, such as the accurate characterization of low-abundance proteoforms harboring >2 PTMs. An open-access tool and discussion of proteoform scoring are included, along with a description of general challenges that lie ahead including improved proteoform separations prior to mass spectrometric analysis, better instrumentation performance, and software development.

  15. Status of the Decommissioning Project Management Information System Development of KAERI in 2015

    Energy Technology Data Exchange (ETDEWEB)

    Jin, Hyung Gon; Park, Seungkook; Park, Heeseong; Song, Chanho [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2015-10-15

    Various information systems have been developed and used at decommissioning sites for planning a project, record keeping for a post management and cost estimation. KAERI is the only one expert group which has decommissioning experiences and KAERI is trying to develop computer code to converge all the data which has been accumulated during KRR-1 and 2 and UCP (Uranium Conversion Plant) decommission. KRR-1 and KRR-2 are TRIGA MARK type of research reactor which were constructed worldwide. Hence, there are many chance to use decommissioning experiences and data when other TRIGA MARK type of research reactors start to decommission. KAERI DPMIS stands for Decommissioning Project Management Information System, which is aiming to re-use of data effectively. As a responsible leading group of Korean decommissioning research field, KAERI has been developing DPMIS application program, which is going to be an important mile stone of decommission industry in Korea. User friendly graphical interface and lots of actual data let people well understood on decommission planning. It is expected that continuous effort and funds will be delivered to this research.

  16. Design, Results, Evolution and Status of the ATLAS simulation in Point1 project.

    CERN Document Server

    Ballestrero, Sergio; The ATLAS collaboration; Brasolin, Franco; Contescu, Alexandru Cristian; Fazio, Daniel; Di Girolamo, Alessandro; Lee, Christopher Jon; Pozo Astigarraga, Mikel Eukeni; Scannicchio, Diana; Sedov, Alexey; Twomey, Matthew Shaun; Wang, Fuquan; Zaytsev, Alexander

    2015-01-01

    During the LHC long shutdown period (LS1), that started in 2013, the simulation in Point1 (Sim@P1) project takes advantage in an opportunistic way of the trigger and data acquisition (TDAQ) farm of the ATLAS experiment. The farm provides more than 1500 computer nodes, and they are particularly suitable for running event generation and Monte Carlo production jobs that are mostly CPU and not I/O bound. It is capable of running up to 2500 virtual machines (VM) provided with 8 CPU cores each, for a total of up to 20000 parallel running jobs. This contribution gives a thorough review of the design, the results and the evolution of the Sim@P1 project operating a large scale Openstack based virtualized platform deployed on top of the ATLAS TDAQ farm computing resources. During LS1, Sim@P1 was one of the most productive GRID sites: it delivered more than 50 million CPU-hours and it generated more than 1.7 billion Monte Carlo events to various analysis communities within the ATLAS collaboration. The particular design ...

  17. Design, Results, Evolution and Status of the ATLAS Simulation at Point1 Project

    CERN Document Server

    AUTHOR|(SzGeCERN)377840; Fressard-Batraneanu, Silvia Maria; Ballestrero, Sergio; Contescu, Alexandru Cristian; Fazio, Daniel; Di Girolamo, Alessandro; Lee, Christopher Jon; Pozo Astigarraga, Mikel Eukeni; Scannicchio, Diana; Sedov, Alexey; Twomey, Matthew Shaun; Wang, Fuquan; Zaytsev, Alexander

    2015-01-01

    Abstract. During the LHC Long Shutdown 1 period (LS1), that started in 2013, the Simulation at Point1 (Sim@P1) Project takes advantage, in an opportunistic way, of the TDAQ (Trigger and Data Acquisition) HLT (High Level Trigger) farm of the ATLAS experiment. This farm provides more than 1300 compute nodes, which are particularly suited for running event generation and Monte Carlo production jobs that are mostly CPU and not I/O bound. It is capable of running up to 2700 virtual machines (VMs) provided with 8 CPU cores each, for a total of up to 22000 parallel running jobs. This contribution gives a review of the design, the results, and the evolution of the Sim@P1 Project; operating a large scale OpenStack based virtualized platform deployed on top of the ATLAS TDAQ HLT farm computing resources. During LS1, Sim@P1 was one of the most productive ATLAS sites: it delivered more than 50 million CPU-hours and it generated more than 1.7 billion Monte Carlo events to various analysis communities. The design aspects a...

  18. Status of the S.E. Geysers effluent pipeline & injection project

    Energy Technology Data Exchange (ETDEWEB)

    Dellinger, M. [Lake County Sanitation District, Lakeport, CA (United States)

    1997-12-31

    A unique public/private partnership of local, state, federal, and corporate stakeholders is constructing the world`s first wastewater-to-electricity system in Lake County, California. A rare example of a genuinely {open_quotes}sustainable{close_quotes} system, three Lake County communities will recycle their treated wastewater effluent through the Geysers geothermal steamfield to produce an estimated 625,000 MWh of electricity annually from six existing geothermal power plants. The concept is shown schematically. Construction was initiated in October 1995, and as of this writing, the system is approximately 85% complete. Operational start-up is expected in October 1997. The key to the project`s success thus far has been its emphasis on cooperative action among affected stakeholders; and a broad, community-based view of solving problems rather than the traditional, narrower view of engineering-driven technical solutions. Special attention has been given to environmentally-responsive engineering design to avoid or minimize adverse environmental impacts.

  19. Exploring the joint effect of atmospheric pollution and socioeconomic status on selected health outcomes: an overview of the PAISARC project

    Energy Technology Data Exchange (ETDEWEB)

    Bard, D [Ecole Nationale de la Sante Publique, Rennes (France); Laurent, O [Ecole Nationale de la Sante Publique, Rennes (France); Filleul, L [CIRE Aquitaine, Bordeaux (France); Havard, S [Ecole Nationale de la Sante Publique, Rennes (France); Deguen, S [Ecole Nationale de la Sante Publique, Rennes (France); Segala, C [Sepia-Sante, Melrand (France); Pedrono, G [Sepia-Sante, Melrand (France); Riviere, E [ASPA, Schiltigheim (France); Schillinger, C [ASPA, Schiltigheim (France); Rouil, L [INERIS, Verneuil-en-Halatte (France); Arveiler, D [Registre des Cardiopathies Ischemiques du Bas-Rhin, Laboratoire d' epidemiologie et de sante publique-EA 1801, Universite Louis Pasteur, Strasbourg (France); Eilstein, D [Institut de Veille Sanitaire, Saint Maurice (France)

    2007-10-15

    Health socioeconomic gradients are well documented in developed countries, but incompletely explained. A portion of these health inequalities may be explained by environmental exposures. The objective of PAISARC is to explore the relations between socioeconomic status, air pollution exposure and two selected health outcomes-asthma exacerbations and myocardial infarction-at the level of a small area. The study design is ecological, using data available from the national census, with the residential block (French IRIS, 2000 people on average, National Institute of Statistics-INSEE) as the statistical unit. The setting is the Greater Strasbourg metropolitan area (450 000 inhabitants) in eastern France. We first constructed a socioeconomic status index, using 1999 national census data and principal component analysis at the resolution of these census blocks. Air pollution data were then modeled at the same resolution on an hourly basis for the entire study period (2000-2005). Health data were obtained from various sources (local emergency networks, the local population-based coronary heart disease registry, health insurance funds) according to the health outcome. We present here the initial results and discuss the methodological approaches best suited for the forthcoming steps of our project.

  20. Coal combustion science. Quarterly progress report, April 1993--June 1993

    Energy Technology Data Exchange (ETDEWEB)

    Hardesty, D.R. [ed.

    1994-05-01

    This document is a quarterly status report of the Coal Combustion Science Project that is being conducted at the Combustion Research Facility, Sandia National Laboratories. The information reported is for Apr-Jun 1993. The objective of this work is to support the Office of Fossil Energy in executing research on coal combustion science. This project consists of basic research on coal combustion that supports both the PETC Direct Utilization Advanced Research and Technology Development Program, and the International Energy Agency Coal Combustion Science Project. The objective of the kinetics and mechanisms of pulverized coal char combustion task is to characterize the combustion behavior of selected US coals under conditions relevant to industrial pulverized coal-fired furnaces. Work is being done in four areas: kinetics of heterogeneous fuel particle populations; char combustion kinetics at high carbon conversion; the role of particle structure and the char formation process in combustion and; unification of the Sandia char combustion data base. This data base on the high temperature reactivities of chars from strategic US coals will permit identification of important fuel-specific trends and development of predictive capabilities for advanced coal combustion systems. The objective of the fate of inorganic material during coal combustion task is the establish a quantitative understanding of the mechanisms and rates of transformation, fragmentation, and deposition of inorganic material during coal combustion as a function of coal type, particle size and temperature, the initial forms and distribution of inorganic species in the unreacted coal, and the local gas temperature and composition. In addition, optical diagnostic capabilities are being developed for in situ, real-time detection of inorganic vapor species and surface species during ash deposition. Selected papers have been indexed separately for inclusion in the Energy Science and Technology Database.

  1. WE-AB-213-02: Status of Medical Physics Collaborations, and Projects in Latin America

    Energy Technology Data Exchange (ETDEWEB)

    Guzman, S.

    2015-06-15

    AAPM projects and collaborations in Africa Adam Shulman (AA-SC Chair) The African Affairs Subcommittee (AA-SC) of the AAPM will present a multi-institutional approach to medical physics support in Africa. Current work to increase the quality of care and level of safety for the medical physics practice in Senegal, Ghana, and Zimbabwe will be presented, along with preliminary projects in Nigeria and Botswana. Because the task of addressing the needs of medical physics in countries across Africa is larger than one entity can accomplish on its own, the AA-SC has taken the approach of joining forces with multiple organizations such as Radiating Hope and TreatSafely (NGO’s), the IAEA, companies like BrainLab, Varian and Elekta, medical volunteers and academic institutions such as NYU and Washington University. Elements of current projects include: 1) Distance training and evaluation of the quality of contouring and treatment planning, teaching treatment planning and other subjects, and troubleshooting using modern telecommunications technology in Senegal, Ghana, and Zimbabwe; 2) Assistance in the transition from 2D to 3D in Senegal and Zimbabwe; 3) Assistance in the transition from 3D to IMRT using in-house compensators in Senegal; 4) Modernizing the cancer center in Senegal and increasing safety and; 5) Training on on 3D techniques in Ghana; 6) Assisting a teaching and training radiation oncology center to be built in Zimbabwe; 7) Working with the ISEP Program in Sub-Saharan Africa; 8) Creating instructional videos on linac commissioning; 9) Working on a possible collaboration to train physicists in Nigeria. Building on past achievements, the subcommittee seeks to make a larger impact on the continent, as the number and size of projects increases and more human resources become available. The State of Medical Physics Collaborations and Projects in Latin America Sandra Guzman (Peru) The lack of Medical Physicists (MP) in many Latin American (LA) countries leads to

  2. COCONet (Continuously Operating Caribbean GPS Observational Network): Network Status and Project Highlights

    Science.gov (United States)

    Feaux, K.; Braun, J. J.; Calais, E.; Dausz, K.; Friesen, B. T.; Mattioli, G. S.; Miller, M. M.; Normandeau, J.; Seider, E.; Wang, G.

    2012-12-01

    The beauty and diversity of the Caribbean region result from geological and atmospheric processes that also pose serious threats to the large population within reach of seismic faults, hurricanes tracks, or sea-level change. The capacity to understand, prepare for, adapt to, and in some cases predict these natural hazards requires Earth observations on both large and small scales. The COCONet project was funded by the National Science Foundation (NSF) with the aim of developing a large-scale geodetic and atmospheric infrastructure in the Caribbean that will form the backbone for a broad range of geoscience and atmospheric investigations and enable research on process-oriented science questions with direct relevance to geohazards. COCONet will consist of 50 new GPS and meteorological stations throughout the Caribbean region, 15 existing stations refurbished with new receivers, antennas, and meteorological instruments, and will also incorporate data from up to 61 existing operational GPS stations. Additional funding has recently been allocated to install 2 new collocated GPS and tide gauge sites and also add GPS instruments at two existing tide gauge sites in the Caribbean region. COCONet will provide free, high-quality, low-latency, open-format data and data products for researchers, educators, students, and the private sector. Data will be used by US and international scientists to study solid earth processes such as plate kinematics and dynamics as well as plate boundary interactions and deformation, with an emphasis on the earthquake cycle. COCNet will also serve atmospheric science objectives by providing more precise estimates of tropospheric water vapor and enabling better forecast of the dynamics of airborne moisture associated with the yearly Caribbean hurricane cycle. COCONet is being installed and will be maintained by UNAVCO on behalf of the science and other user communities in the United States and abroad, thus leveraging UNAVCO's proven record of

  3. Status of the advanced Stirling conversion system project for 25 kW dish Stirling applications

    Science.gov (United States)

    Shaltens, Richard K.; Schreiber, Jeffrey G.

    1991-01-01

    Technology development for Stirling convertors directed toward a dynamic power source for space applications is discussed. Space power requirements include high reliability with very long life, low vibration, and high system efficiency. The free-piston Stirling engine has the potential for future high power space conversion systems, either nuclear or solar powered. Although these applications appear to be quite different, their requirements complement each other. The advanced Stirling conversion system (ASCS) project at NASA Lewis Research Center is described. Each system design features a solar receiver/liquid metal heat transport system and a free-piston Stirling convertor with a means to provide nominally 25 kW of electric power to utility grid while meeting the US Department of Energy (DOE) performance and long term cost goals. The design is compared with other ASCS designs.

  4. Field research tasks and technical services. Project status report, June 1-August 31, 1982

    Energy Technology Data Exchange (ETDEWEB)

    None

    1982-09-01

    Emphasis was placed on analysis efforts for passive design tools, industry review of the initial performance monitoring data on the 160 hot water systems that are under test, and the work concerned with residential PV systems. Of particular importance was the completion of a report covering analysis of residential PV systems integrated with on-site thermal storage. This work shows that some advantage may result in hot, humid climates where there is more of a load balance throughout the year because of the relatively constant cooling load. Effort was started on the evaluation of completed Midwest AT projects, analysis from a management viewpoint, and preparation for more detailed monitoring and technical assistance to grantees. A listing of documents produced during the reporting period is included and materials defining the work which was accomplished are provided.

  5. Status of data, major results, and plans for geophysical activities, Yucca Mountain Project

    Energy Technology Data Exchange (ETDEWEB)

    Oliver, H.W. [Geological Survey, Menlo Park, CA (USA); Hardin, E.L. [Science Applications International Corp., Las Vegas, NV (USA); Nelson, P.H. [Geological Survey, Denver, CO (USA)] [eds.

    1990-07-01

    This report describes past and planned geophysical activities associated with the Yucca Mountain Project and is intended to serve as a starting point for integration of geophysical activities. This report relates past results to site characterization plans, as presented in the Yucca Mountain Site Characterization Plan (SCP). This report discusses seismic exploration, potential field methods, geoelectrical methods, teleseismic data collection and velocity structural modeling, and remote sensing. This report discusses surface-based, airborne, borehole, surface-to-borehole, crosshole, and Exploratory Shaft Facility-related activities. The data described in this paper, and the publications discussed, have been selected based on several considerations; location with respect to Yucca Mountain, whether the success or failure of geophysical data is important to future activities, elucidation of features of interest, and judgment as to the likelihood that the method will produce information that is important for site characterization. 65 refs., 19 figs., 12 tabs.

  6. Status of decommissioning activities at the Fernald Environmental Management Project (FEMP) site

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-12-31

    The Fernald Environmental Management Project (FEMP) was formally closed and the mission of the facility was officially redirected toward environmental restoration in August 1991. Many of the production facilities and equipment still contained quantities of raw, intermediate, and finished production-related materials. The safe Shutdown program was initiated to remove and properly disposition all nuclear product and in process residue materials, supplies, chemicals, and associated process equipment that was abandoned in place when FEMP stopped production in 1989. As part of the remedial design of the interim remedial action, a schedule for building dismantlement was submitted in June 1995. A 31-year schedule was developed, based on anticipation of reduced funding levels. However, recent cleanup successes at Fernald led to DOE endorsement of greater funding for the final cleanup, accelerating the schedule for Operable Unit 3 dismantlement, reducing the schedule to ten years. Under the accelerated schedule, several plants will be dismantled, starting in 1996.

  7. Status of HiLASE project: High average power pulsed DPSSL systems for research and industry

    Directory of Open Access Journals (Sweden)

    Mocek T.

    2013-11-01

    Full Text Available We introduce the Czech national R&D project HiLASE which focuses on strategic development of advanced high-repetition rate, diode pumped solid state laser (DPSSL systems that may find use in research, high-tech industry and in the future European large-scale facilities such as HiPER and ELI. Within HiLASE we explore two major concepts: thin-disk and cryogenically cooled multislab amplifiers capable of delivering average output powers above 1 kW level in picosecond-to-nanosecond pulsed regime. In particular, we have started a programme of technology development to demonstrate the scalability of multislab concept up to the kJ level at repetition rate of 1–10 Hz.

  8. Western Gas Sands Project. Status report, 1 March-31 March 1980

    Energy Technology Data Exchange (ETDEWEB)

    1980-01-01

    The March, 1980 progress of the government-sponsored projects directed towards increasing gas production from the low permeability gas sands of the western United States is summarized in this report. A site for the multi-well experiment was approved by the industry review committee; drilling is expected by mid-summer. Bartlesville Energy Technology Center continued work on fracture conductivity, rock/fluid interaction, and log evaluation and interpretation techniques. Lawrence Livermore Laboratory continued experimental and theoretical work on hydraulic fracturing mechanics and analysis of well test data. Analysis of data obtained from a test of the borehole seismic unit by Sandia Laboratories continued. The DOE Well Test Facility continued bottom-hole pressure buildup measurements at the Colorado Interstate Gas Company Miller No. 1 well.

  9. HIE ISOLDE Alignment and monitoring system technical design and project status

    CERN Document Server

    Gayde, J C; Kautzmann, G; Leclercq, Y; Waniorek, S; Williams, L

    2012-01-01

    In the frame of the HIE ISOLDE project most of the existing ISOLDE REX line will be replaced by a superconducting linac in order to upgrade the energy and intensity of the REX ISOLDE facility at CERN. Beam-physics simulations show that the optimum linac working conditions are obtained when the main axes of the active components, RF cavities and solenoid placed inside the cryostats, are aligned and permanently monitored on the REX Nominal Beam Line (NBL) within a precision of 0.3 mm for the cavities and 0.15 mm for the solenoids at one sigma level along directions perpendicular to the beam axis. This paper presents the proposed adjustment and alignment system based on opto-electronic sensors, optics and precise mechanic elements which are used, for some of them, in various non-standard environmental conditions such as high vacuum, cryogenic temperatures.

  10. Status of HiLASE project: High average power pulsed DPSSL systems for research and industry

    Science.gov (United States)

    Mocek, T.; Divoky, M.; Smrz, M.; Sawicka, M.; Chyla, M.; Sikocinski, P.; Vohnikova, H.; Severova, P.; Lucianetti, A.; Novak, J.; Rus, B.

    2013-11-01

    We introduce the Czech national R&D project HiLASE which focuses on strategic development of advanced high-repetition rate, diode pumped solid state laser (DPSSL) systems that may find use in research, high-tech industry and in the future European large-scale facilities such as HiPER and ELI. Within HiLASE we explore two major concepts: thin-disk and cryogenically cooled multislab amplifiers capable of delivering average output powers above 1 kW level in picosecond-to-nanosecond pulsed regime. In particular, we have started a programme of technology development to demonstrate the scalability of multislab concept up to the kJ level at repetition rate of 1-10 Hz.

  11. Status of mapping for pre-detailing and projects of pipelines

    Energy Technology Data Exchange (ETDEWEB)

    Gil, Fabio Vinicius Fontoura; Paoletto, Bonatto Silvia M. [ESTEIO Engenharia e Aerolevantamentos S.A, Curitiba, PR (Brazil)

    2009-07-01

    Considering the ever growing need for widening and supplying of the national energy matrix, ESTEIO Engenharia e Aerolevantamentos SA presents its participation in the Pipeline area, through Cartography activities, pointing out the performance on strips yet to be implanted, with activities as aerial survey, laser surveys, creation of orthophotomap, tracing definition, rivers crossing, geotechnical surveys, cadaster, creation of cadaster maps, strips, basic project drawings, imagery maps, as well as activities for existing strips, such as: aerial survey, laser surveys, strips enlargements, new property surveys, detection of pipelines through PCM technology, planimetric survey of equipment, besides activities for Pipeline Strips Geometry - FEED - pointing out the detailing of the areas which will be used for the dumping of the digging material and definition of accesses to the pipeline strips. We shall also present the technological evolution and consequent product improvements, considering surveys performed with conventional and digital aerial survey cameras, besides laser data. (author)

  12. Coal liquefaction. Quarterly report, April-June 1979

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-04-01

    DOE's program for the conversion of coal to liquid fuels was begun by two of DOE's predecessor agencies: Office of Coal Research (OCR) in 1962, and Bureau of Mines, US Department of the Interior, in the 1930's. Current work is aimed at improved process configurations for both catalytic and non-catalytic processes to provide more attractive processing economics and lower capital investment. The advantage of coal liquefaction is that the entire range of liquid products, especially boiler fuel, distillate fuel oil, and gasoline, can be produced from coal by varying the type of process and operating conditions used in the process. Furthermore, coal-derived liquids have the potential for use as chemical feedstocks. To provide efficient and practical means of utilizing coal resources, DOE is supporting the development of several conversion processes that are currently in the pilot plant stage. DOE, together with the Electric Power Research Institue, has contracted with fourteen projects are described brieflly: funding, description, status, history, and progress in the current quarter. (LTN)

  13. The clinical endocrinology workforce: current status and future projections of supply and demand.

    Science.gov (United States)

    Vigersky, Robert A; Fish, Lisa; Hogan, Paul; Stewart, Andrew; Kutler, Stephanie; Ladenson, Paul W; McDermott, Michael; Hupart, Kenneth H

    2014-09-01

    Many changes in health care delivery, health legislation, and the physician workforce that affect the supply and demand for endocrinology services have occurred since the first published workforce study of adult endocrinologists in 2003. The objective of the study was to assess the current adult endocrinology workforce data and provide the first analysis of the pediatric endocrinology workforce and to project the supply of and demand for endocrinologists through 2025. A workforce model was developed from an analysis of proprietary and publicly available databases, consultation with a technical expert panel, and the results of an online survey of board-certified endocrinologists. The Endocrine Society commissioned The Lewin Group to estimate current supply and to project gaps between supply and demand for endocrinologists. A technical expert panel of senior endocrinologists provided context, clinical information, and direction. The following were measured: 1) the current adult and pediatric endocrinology workforce and the supply of and demand for endocrinologists through 2025 and 2) the number of additional entrants into the endocrinology work pool that would be required to close the gap between supply and demand. Currently there is a shortage of approximately 1500 adult and 100 pediatric full-time equivalent endocrinologists. The gap for adult endocrinologists will expand to 2700 without an increase in the number of fellows trained. An increase in the prevalence of diabetes mellitus further expands the demand for adult endocrinologists. The gap can be closed in 5 and 10 years by increasing the number of fellowship positions by 14.4% and 5.5% per year, respectively. The gap between supply and demand for pediatric endocrinologists will close by 2016, and thereafter an excess supply over demand will develop at the current rate of new entrants into the work force. There are insufficient adult endocrinologists to satisfy current and future demand. A number of proactive

  14. Design, Results, Evolution and Status of the ATLAS Simulation at Point1 Project

    Science.gov (United States)

    Ballestrero, S.; Batraneanu, S. M.; Brasolin, F.; Contescu, C.; Fazio, D.; Di Girolamo, A.; Lee, C. J.; Pozo Astigarraga, M. E.; Scannicchio, D. A.; Sedov, A.; Twomey, M. S.; Wang, F.; Zaytsev, A.

    2015-12-01

    During the LHC Long Shutdown 1 (LSI) period, that started in 2013, the Simulation at Point1 (Sim@P1) project takes advantage, in an opportunistic way, of the TDAQ (Trigger and Data Acquisition) HLT (High-Level Trigger) farm of the ATLAS experiment. This farm provides more than 1300 compute nodes, which are particularly suited for running event generation and Monte Carlo production jobs that are mostly CPU and not I/O bound. It is capable of running up to 2700 Virtual Machines (VMs) each with 8 CPU cores, for a total of up to 22000 parallel jobs. This contribution gives a review of the design, the results, and the evolution of the Sim@P1 project, operating a large scale OpenStack based virtualized platform deployed on top of the ATLAS TDAQ HLT farm computing resources. During LS1, Sim@P1 was one of the most productive ATLAS sites: it delivered more than 33 million CPU-hours and it generated more than 1.1 billion Monte Carlo events. The design aspects are presented: the virtualization platform exploited by Sim@P1 avoids interferences with TDAQ operations and it guarantees the security and the usability of the ATLAS private network. The cloud mechanism allows the separation of the needed support on both infrastructural (hardware, virtualization layer) and logical (Grid site support) levels. This paper focuses on the operational aspects of such a large system during the upcoming LHC Run 2 period: simple, reliable, and efficient tools are needed to quickly switch from Sim@P1 to TDAQ mode and back, to exploit the resources when they are not used for the data acquisition, even for short periods. The evolution of the central OpenStack infrastructure is described, as it was upgraded from Folsom to the Icehouse release, including the scalability issues addressed.

  15. RADIOLOGICAL STATUS OF THE GROUND-WATER BENEATH THE HANFORD PROJECT JANUARY-DECEMBER 1978

    Energy Technology Data Exchange (ETDEWEB)

    Eddy, PA

    1979-04-01

    This report is one of a series prepared annually for the Department of Energy, to provide an evaluation of the status of ground-water contamination resulting from Hanford's onsite discharges. Data collected during 1978 describe the movement of major plumes {{beta}{sub t}, {sup 3}H, NO{sub 3}) that respond to the influences of ground-water flow, ionic dispersion and radioactive decay. The total beta plume continues to recede, with the exception of a beta source that is beginning to show up in the 300 Area, a result of minor spills and leaks which have occurred during the operating life of the 300 Area. The tritium plume continues to expand and is mapped as having reached the Columbia River, although its contribution to the river cannot be distinguished from that attributable to atmospheric fallout. The plume now shows much the same configuration as in 1977. The nitrate plume shows general stability relative to its size with concentrations in the vicinity of the 100-H Area continuing to be high as a result of leaks from the evaporation facility. The results of a study to determine the vertical distribution of contaminants in the Hanford ground-water system indicate that the majority of contaminants are stratified in the upper portions of the unconfined aquifer.

  16. Kootenai River Fisheries Investigation : Stock Status of Burbot : Project Progress Report 2008 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Paragamian, Valughn L.; Laude Dorothy C.

    2008-12-26

    Objectives of this investigation were to (1) monitor the population status and recruitment of burbot Lota lota in the Kootenai River, Idaho and British Columbia, Canada during the winter of 2006-2007; (2) evaluate the selective withdrawal system in place at Libby Dam to maintain the river temperature near Bonners Ferry between 1-4 C (November-December) to improve burbot migration and spawning activity; and (3) determine if a hatching success of 10% of eyed burbot embryos could be achieved through extensive rearing and produce fingerlings averaging 9.8 cm in six months. Water temperature did not fall below the upper limit (4 C) until mid-January but was usually maintained between 1-4 C January through February and was acceptable. Snowpack was characterized by a 101% of normal January runoff forecast. Adult burbot were sampled with hoop nets and slat traps. Only three burbot were captured in hoop nets, all at Ambush Rock (rkm 244.5). No burbot were caught in either slat traps or juvenile sampling gear, indicating the population is nearly extirpated. Burbot catch per unit effort in hoop nets was 0.003 fish/net d. Extensive rearing was moved to a smaller private pond and will be reported in the 2008-2009 annual report.

  17. Status and objectives of the DENISE ion source project at DCU

    Science.gov (United States)

    McNeely, P.; Boilson, D.; Curran, N.; Hopkins, M. B.; Vender, D.

    1998-08-01

    In support of the international collaborative effort into fusion research, work has begun to re-commission the Deuterium Negative Ion Source Experiment (DENISE) at Dublin City University (DCU). Modifications to the original system are nearing completion. The major goal of these modifications is easier access to both the ion source and the extraction region for diagnostic systems. A new source chamber has been installed. It can be used with both standard Langmuir probes, and a new laser photo-detachment probe currently under construction. The source chamber allows operation in any one of three modes: filament driven, CW RF driven, or Pulsed RF driven (up to 3 kW of 13.5 MHz RF at 250 Hz). A PC computer control system based on LabView™ is nearing completion and is intended for both system control and data logging. An investigation into the production and extraction of H- ions has begun. Langmuir probe data has been collected at pressures from 5-200 mTorr, for CW RF powers between 25 and 600 W, and for 3 radial probe positions. This paper will present the current status of DENISE and the future plans for this versatile source.

  18. Childhood socioeconomic status is associated with psychosocial resources in African Americans: the Pittsburgh Healthy Heart Project.

    Science.gov (United States)

    Beatty, Danielle L; Kamarck, Thomas W; Matthews, Karen A; Shiffman, Saul

    2011-07-01

    To determine whether lower childhood socioeconomic status (SES) was associated with fewer psychosocial resources independent of adult SES, and whether these associations differed by race/ethnicity. Cross-sectional study of 342 middle-aged (M = 60.5 ± 4.7) African American (n = 49) and Caucasian (n = 293) adults. Childhood SES and adult SES were assessed via highest parental education and participant education, respectively. Participants completed: (a) 6 days of ecological momentary assessment via electronic diaries to assess social support and the number of social interactions and (b) self-report measures of social support, social network diversity, and coping-specifically, active, planning, and emotion focused coping. The interaction term for childhood SES and race/ethnicity significantly predicted several psychosocial resources. Lower childhood SES was associated with less perceived social support in daily life, a less diverse social network, and more limited use of proactive coping strategies in adulthood among African Americans, regardless of adult SES. Comparable associations were not observed among Caucasians. Childhood SES is associated with psychosocial resources in adulthood among African Americans, independent of SES in adulthood. Given emerging associations between childhood SES and health in adulthood, future studies to disentangle the role of psychosocial resources as a mediating pathway and to further examine racial/ethnic variations across these associations are warranted.

  19. The GINGER project and status of the GINGERino prototype at LNGS

    Science.gov (United States)

    Ortolan, A.; Belfi, J.; Bosi, F.; Di Virgilio, A.; Beverini, N.; Carelli, G.; Maccioni, E.; Santagata, R.; Simonelli, A.; Beghi, A.; Cuccato, D.; Donazzan, A.; Naletto, G.

    2016-05-01

    GINGER (Gyroscopes IN GEneral Relativity) is a proposal for measuring in a ground-based laboratory the Lense-Thirring effect, known also as inertial frame dragging, that is predicted by General Relativity, and is induced by the rotation of a massive source. GINGER will consist in an array of at least three square ring lasers, mutually orthogonal, with about 6-10 m side, and located in a deep underground site, possibly the INFN - National Laboratories of Gran Sasso. The tri-axial design will provide a complete estimation of the laboratory frame angular velocity, to be compared with the Earths rotation estimate provided by IERS with respect the fixed stars frame. Large-size ring lasers have already reached a very high sensitivity, allowing for relevant geodetic measurements. The accuracy required for Lense-Thirring effect measurement is higher than 10-14 rad/s and therefore Earth angular velocity must be measured within one part in 10-9. A 3.6 m side, square ring laser, called GINGERino, has been recently installed inside the Gran Sasso underground laboratories in order to qualify the site for a future installation of GINGER. We discuss the current status of the experimental work, and in particular of the GINGERino prototype.

  20. The ASTRI Project: prototype status and future plans for a Cherenkov dual-mirror small-telescope array

    CERN Document Server

    Vercellone, S; Maccarone, M C; Di Pierro, F; Vallania, P; Bonnoli, G; Canestrari, R; Pareschi, G; Tosti, G

    2013-01-01

    ASTRI ("Astrofisica con Specchi a Tecnologia Replicante Italiana") is a flagship project of the Italian Ministry of Education, University and Research. Within this framework, INAF is currently developing a wide field of view (9.6 degrees in diameter) end-to-end prototype of the CTA small-size telescope (SST), devoted to the investigation of the energy range from a fraction of TeV up to tens of TeVs, and scheduled to start data acquisition in 2014. For the first time, a dual-mirror Schwarzschild-Couder optical design will be adopted on a Cherenkov telescope, in order to obtain a compact optical configuration. A second challenging, but innovative technical solution consists of a modular focal surface camera based on Silicon photo-multipliers with a logical pixel size of 6.2mm x 6.2mm. Here we describe the current status of the project, the expected performance, and its possible evolution in terms of an SST mini-array. This CTA-SST precursor, composed of a few SSTs and developed in collaboration with CTA interna...

  1. Current Status on Mechanical Disassembly and Shearing System Development in FaCT Project

    Energy Technology Data Exchange (ETDEWEB)

    Washiya, T.; Tasaka, M.; Kitagaki, T.; Higuti, H.; Koizumi, K.; Myouchin, M.; Koyama, T. [JAEA, 4-33 Muramatsu, Tokai-mura, Ibaraki 319-1194 (Japan); Kobayashi, T. [Japan Atomic Power Company - JAPC (Japan)

    2009-06-15

    Japan Atomic Energy Agency (JAEA) has been carried out the Fast Reactor Cycle Technology Development (FaCT) project in cooperation with the Japanese electric utilities. As for the development of the advanced aqueous reprocessing in the FaCT project, JAEA and Japan Atomic Power Company (JAPC) have been developing a reliable disassembly and shearing system for FBR fuel reprocessing. As configuration of FBR fuel assembly, fuel pins are covered with a hexagonal shaped wrapper tube, which must be separated from the fuel pins prior to the shear process. We proposed new disassembly procedures combined two mechanical cutting operations and one pulling operation. The cutting operation has two modes, such as the slit-cutting mode for the wrapper tube cutting and the crop-cutting mode for the pin bundle cutting to separate the entrance nozzle. After the slit-cut operations, the wrapper tube will be pulled and removed from the fuel pins bundle. Some fundamental experiments were carried out to select the cutting tool by using FMS and ODS steals nominated as the material of the commercial FBR fuel, and CBN wheel shown the highest durability and selected as the promising tool. With reflecting of these technologies, an engineering-scale system testing device was designed and fabricated. And to confirm the system performance, some demonstration tests by using a simulated fuel assembly of prototype reactor 'Monju' has been stared. In the fuel shearing process, we proposed the short-length shearing to obtain highly fragmented fuel to provide efficient fuel dissolution, which required adapting to the uranium crystallization process. The fragment rate is affected by the shear-length and the layout of fuel pins in the shear magazine. In order to optimize the shear conditions, parametric tests by using shear machine and simulated fuel pins was carried out. As the results, optimum shear length is selected to be 10 mm. In this paper, we will report the latest experimental results

  2. Base program on energy related research. Quarterly report, August 1, 1993--October 31, 1993

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-12-31

    Progress in four major research areas is summarized in this report. In the area of oil and gas, subtasks reported on are CROW process modeling and miscible-immiscible gas injection processes. Advanced systems applications research includes four subtasks: (1) development and optimization of a process for the production of a premium solid fuel from western U.S. coals, (2) development of an on-line alkali monitoring probe, (3) optimization of the recycle oil process for eastern oil shale, and (4) process support and development. Solid waste management and remediation of contaminated soils are reported on for the environmental technologies research area. Under applied energy science, heavy oil/plastics co-processing activities are described. Information supplied for each subtask includes an account status report, which includes budget and schedule data, and a brief project summary consisting of research objectives, accomplishments, and activities scheduled for the next quarter. 3 refs., 2 figs., 1 tab.

  3. Quarterly Report: Microchannel-Assisted Nanomaterial Deposition Technology for Photovoltaic Material Production

    Energy Technology Data Exchange (ETDEWEB)

    Palo, Daniel R.

    2011-04-26

    Quarterly report to ITP for Nanomanufacturing program. Report covers FY11 Q2. The primary objective of this project is to develop a nanomanufacturing process which will reduce the manufacturing energy, environmental discharge, and production cost associated with current nano-scale thin-film photovoltaic (PV) manufacturing approaches. The secondary objective is to use a derivative of this nanomanufacturing process to enable greener, more efficient manufacturing of higher efficiency quantum dot-based photovoltaic cells now under development. The work is to develop and demonstrate a scalable (pilot) microreactor-assisted nanomaterial processing platform for the production, purification, functionalization, and solution deposition of nanomaterials for photovoltaic applications. The high level task duration is shown. Phase I consists of a pilot platform for Gen II PV films along with parallel efforts aimed at Gen III PV quantum dot materials. Status of each task is described.

  4. Quarterly Report: Microchannel-Assisted Nanomaterial Deposition Technology for Photovoltaic Material Production

    Energy Technology Data Exchange (ETDEWEB)

    Palo, Daniel R.

    2011-04-26

    Quarterly report to ITP for Nanomanufacturing program. Report covers FY11 Q2. The primary objective of this project is to develop a nanomanufacturing process which will reduce the manufacturing energy, environmental discharge, and production cost associated with current nano-scale thin-film photovoltaic (PV) manufacturing approaches. The secondary objective is to use a derivative of this nanomanufacturing process to enable greener, more efficient manufacturing of higher efficiency quantum dot-based photovoltaic cells now under development. The work is to develop and demonstrate a scalable (pilot) microreactor-assisted nanomaterial processing platform for the production, purification, functionalization, and solution deposition of nanomaterials for photovoltaic applications. The high level task duration is shown. Phase I consists of a pilot platform for Gen II PV films along with parallel efforts aimed at Gen III PV quantum dot materials. Status of each task is described.

  5. NREL Solar Radiation Resource Assessment Project: Status and outlook. FY 1991 annual progress report

    Energy Technology Data Exchange (ETDEWEB)

    Renne, D.; Riordan, C.; Maxwell, E.; Stoffel, T.; Marion, B.; Rymes, M.; Wilcox, S.; Myers, D.

    1992-05-01

    This report summarizes the activities and accomplishments of NREL`s Solar Radiation Resource Assessment Project during fiscal year 1991. Currently, the primary focus of the SRRAP is to produce a 1961--1990 National Solar Radiation Data Base, providing hourly values of global horizontal, diffuse, and direct normal solar radiation at approximately 250 sites around the United States. Because these solar radiation quantities have been measured intermittently at only about 50 of these sites, models were developed and applied to the majority of the stations to provide estimates of these parameters. Although approximately 93% of the data base consists of modeled data this represents a significant improvement over the SOLMET/ERSATZ 1952--1975 data base. The magnitude and importance of this activity are such that the majority of SRRAP human and financial in many other activities, which are reported here. These include the continued maintenance of a solar radiation monitoring network in the southeast United States at six Historically Black Colleges and Universities (HBCU`s), the transfer of solar radiation resource assessment technology through a variety of activities, participation in international programs, and the maintenance and operation of NREL`s Solar Radiation Research Laboratory. 17 refs.

  6. The Karlsruhe Astrophysical Database of Nucleosynthesis in Stars Project - Status and Prospects

    CERN Document Server

    Dillmann, Iris; Fülöp, Zsolt; Plag, Ralf; Käppeler, Franz; Rauscher, Thomas

    2014-01-01

    The KADoNiS (Karlsruhe Astrophysical Database of Nucleosynthesis in Stars) project is an astrophysical online database for cross sections relevant for nucleosynthesis in the $s$ process and the $\\gamma$ process. The $s$-process database (www.kadonis.org) was started in 2005 and is presently facing its 4th update (KADoNiS v1.0). The $\\gamma$-process database (KADoNiS-p, www.kadonis.org/pprocess) was recently revised and re-launched in March 2013. Both databases are compilations for experimental cross sections with relevance to heavy ion nucleosynthesis. For the $s$ process recommended Maxwellian averaged cross sections for $kT$= 5-100~keV are given for more than 360 isotopes between $^{1}$H and $^{210}$Bi. For the $\\gamma$-process database all available experimental data from $(p,\\gamma), (p,n), (p,\\alpha), (\\alpha,\\gamma), (\\alpha,n)$, and $(\\alpha,p)$ reactions between $^{70}$Ge and $^{209}$Bi in or close to the respective Gamow window were collected and can be compared to theoretical predictions. The aim of...

  7. TanDEM-X the Earth surface observation project from space level - basis and mission status

    Directory of Open Access Journals (Sweden)

    Jerzy Wiśniowski

    2015-03-01

    Full Text Available TanDEM-X is DLR (Deutsches Zentrum für Luft- und Raumfahrt the Earth surface observation project using high-resolution SAR interferometry. It opens a new era in space borne radar remote sensing. The system is based on two satellites: TerraSAR-X (TSX and TanDEM-X (TDX flying on the very close, strictly controlled orbits. This paper gives an overview of the radar technology and overview of the TanDEM-X mission concept which is based on several innovative technologies. The primary objective of the mission is to deliver a global digital elevation model (DEM with an unprecedented accuracy, which is equal to or surpass the HRTI-3 specifications (12 m posting, relative height accuracy ±2 m for slope < 20% and ±4 m for slope > 20% [8]. Beyond that, TanDEM-X provides a highly reconfigurable platform for the demonstration of new radar imaging techniques and applications.[b]Keywords[/b]: remote sensing, Bistatic SAR, digital elevation model (DEM, Helix formation, SAR interferomery, HRTI-3, synchronization

  8. Western Gas Sands Project. Status report, 1 September 1979-30 September 1979

    Energy Technology Data Exchange (ETDEWEB)

    None

    1979-01-01

    This report summarizes progress of the government-sponsored projects directed toward increasing gas production from the low-permeability gas sands of the western United States. Bartlesville Energy Technology Center continued work on rock-fluid interaction and advanced logging techniques. Lawrence Livermore Laboratory continued experimental and theoretical work on hydraulic fracturing mechanics and analysis of well test data. Los Alamos Scientific Laboratory continued work on permeability and porosity determination of core samples and geological support studies. Sandia Laboratories continued work on their EGR Instrumentation and Diagnostic Program. Cyclic gas injection continued at Colorado Interstate Gas Company's Miller No. 1 and Sprague No. 1 wells. The DOE Well Test Facility is continuing to provide technical support to the Gas Research Institute/Rio Blanco Natural Gas MHF experiment. The Gas Producing Enterprises, Inc. Natural Buttes Unit wells continued to flow to sales. The Mitchell Energy Corporation Muse-Duke No. 1 was opened after a 28-day shut-in period. The hydraulic fracturing containment experiment continued for the Sandia-mineback program.

  9. Prediction of total quarter milk somatic cell counts based on foremilk sampling.

    Science.gov (United States)

    Wellnitz, Olga; Doherr, Marcus G; Woloszyn, Marta; Bruckmaier, Rupert M

    2009-08-01

    Determination of somatic cell count (SCC) is used worldwide in dairy practice to describe the hygienic status of the milk and the udder health of cows. When SCC is tested on a quarter level to detect single quarters with high SCC levels of cows for practical reasons, mostly foremilk samples after prestimulation (i.e. cleaning of the udder) are used. However, SCC is usually different in different milk fractions. Therefore, the goal of this study was the investigation of the use of foremilk samples for the estimation of total quarter SCC. A total of 378 milkings in 19 dairy cows were performed with a special milking device to drain quarter milk separately. Foremilk samples were taken after udder stimulation and before cluster attachment. SCC was measured in foremilk samples and in total quarter milk. Total quarter milk SCC could not be predicted precisely from foremilk SCC measurements. At relatively high foremilk SCC levels (>300 x 10(3) cells/ml) foremilk SCC were higher than total quarter milk. At around (50-300) x 10(3) cells/ml foremilk and total quarter SCC did not differ considerably. Most interestingly, if foremilk SCC was lower than 50 x 10(3) cells/ml the total quarter SCC was higher than foremilk SCC. In addition, individual cows showed dramatic variations in foremilk SCC that were not very well related to total quarter milk SCC. In conclusion, foremilk samples are useful to detect high quarter milk SCC to recognize possibly infected quarters, only if precise cell counts are not required. However, foremilk samples can be deceptive if very low cell numbers are to be detected.

  10. Electronic Service Statistics - Quarterly Report

    Data.gov (United States)

    Social Security Administration — This is a quarterly report that compares electronic data vs non-electronic data for electronic services. Report contains six main sections namely, electronic access,...

  11. Status of the first NASA EV-I Project, Tropospheric Emissions: Monitoring of Pollution (TEMPO)

    Science.gov (United States)

    Chance, K.; Liu, X.; Suleiman, R. M.; Flittner, D. E.; Al-Saadi, J. A.; Janz, S. J.

    2013-12-01

    TEMPO is the first NASA Earth Venture Instrument. It will measure atmospheric pollution for greater North America from space using ultraviolet and visible spectroscopy. TEMPO measures from Mexico City to the Canadian tar sands, and from the Atlantic to the Pacific, hourly and at high spatial resolution (2 km N/S × 4.5 km E/W at the center of its field of regard). The status of TEMPO including progress in instrument definition and implementation of the ground system will be presented. TEMPO provides a minimally-redundant measurement suite that includes all key elements of tropospheric air pollution chemistry. Measurements are from geostationary (GEO) orbit, to capture the inherent high variability in the diurnal cycle of emissions and chemistry. The small spatial footprint resolves pollution sources at sub-urban scale. Together, this temporal and spatial resolution improves emission inventories, monitors population exposure, and enables effective emission-control strategies. TEMPO will be delivered in 2017 for integration onto a NASA-selected GEO host spacecraft for launch as early as 2018. It will provide the spectra required to retrieve O3, NO2, SO2, H2CO, C2H2O2, H2O, aerosols, cloud parameters, and UVB radiation. TEMPO thus measures the major elements, directly or by proxy, in the tropospheric O3 chemistry cycle. Multi-spectral observations provide sensitivity to O3 in the lowermost troposphere, substantially reducing uncertainty in air quality predictions. TEMPO quantifies and tracks the evolution of aerosol loading. It provides near-real-time air quality products that will be made widely, publicly available. Additional gases not central to air quality, including BrO, OClO, and IO will also be measured. TEMPO and its Asian (GEMS) and European (Sentinel-4) constellation partners make the first tropospheric trace gas measurements from GEO, building on the heritage of six spectrometers flown in low-earth-orbit (LEO). These LEO instruments measure the needed

  12. Status report of the SRT radiotelescope control software: the DISCOS project

    Science.gov (United States)

    Orlati, A.; Bartolini, M.; Buttu, M.; Fara, A.; Migoni, C.; Poppi, S.; Righini, S.

    2016-08-01

    The Sardinia Radio Telescope (SRT) is a 64-m fully-steerable radio telescope. It is provided with an active surface to correct for gravitational deformations, allowing observations from 300 MHz to 100 GHz. At present, three receivers are available: a coaxial LP-band receiver (305-410 MHz and 1.5-1.8 GHz), a C-band receiver (5.7-7.7 GHz) and a 7-feed K-band receiver (18-26.5 GHz). Several back-ends are also available in order to perform the different data acquisition and analysis procedures requested by scientific projects. The design and development of the SRT control software started in 2004, and now belongs to a wider project called DISCOS (Development of the Italian Single-dish COntrol System), which provides a common infrastructure to the three Italian radio telescopes (Medicina, Noto and SRT dishes). DISCOS is based on the Alma Common Software (ACS) framework, and currently consists of more than 500k lines of code. It is organized in a common core and three specific product lines, one for each telescope. Recent developments, carried out after the conclusion of the technical commissioning of the instrument (October 2013), consisted in the addition of several new features in many parts of the observing pipeline, spanning from the motion control to the digital back-ends for data acquisition and data formatting; we brie y describe such improvements. More importantly, in the last two years we have supported the astronomical validation of the SRT radio telescope, leading to the opening of the first public call for proposals in late 2015. During this period, while assisting both the engineering and the scientific staff, we massively employed the control software and were able to test all of its features: in this process we received our first feedback from the users and we could verify how the system performed in a real-life scenario, drawing the first conclusions about the overall system stability and performance. We examine how the system behaves in terms of network

  13. Clean Coal Technology Demonstration Program: Project fact sheets 2000, status as of June 30, 2000

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-09-01

    The Clean Coal Technology Demonstration Program (CCT Program), a model of government and industry cooperation, responds to the Department of Energy's (DOE) mission to foster a secure and reliable energy system that is environmentally and economically sustainable. The CCT Program represents an investment of over $5.2 billion in advanced coal-based technology, with industry and state governments providing an unprecedented 66 percent of the funding. With 26 of the 38 active projects having completed operations, the CCT Program has yielded clean coal technologies (CCTs) that are capable of meeting existing and emerging environmental regulations and competing in a deregulated electric power marketplace. The CCT Program is providing a portfolio of technologies that will assure that U.S. recoverable coal reserves of 274 billion tons can continue to supply the nation's energy needs economically and in an environmentally sound manner. As the nation embarks on a new millennium, many of the clean coal technologies have realized commercial application. Industry stands ready to respond to the energy and environmental demands of the 21st century, both domestically and internationally, For existing power plants, there are cost-effective environmental control devices to control sulfur dioxide (S02), nitrogen oxides (NO,), and particulate matter (PM). Also ready is a new generation of technologies that can produce electricity and other commodities, such as steam and synthetic gas, and provide efficiencies and environmental performance responsive to global climate change concerns. The CCT Program took a pollution prevention approach as well, demonstrating technologies that remove pollutants or their precursors from coal-based fuels before combustion. Finally, new technologies were introduced into the major coal-based industries, such as steel production, to enhance environmental performance. Thanks in part to the CCT Program, coal--abundant, secure, and economical

  14. EGNOS ''Implementing GNSS-1 for Europe''. A project status overview

    Energy Technology Data Exchange (ETDEWEB)

    Benedicto, J.; Michel, P.; Ventura-Traveset, J. [European Space Agency, 31 - Toulouse (France)

    1999-07-01

    EGNOS is being developed as the main European contribution to GNSS-1 to serve the needs of aeronautical, maritime and land transport applications in the European and neighbouring regions. For aviation, EGNOS AOC is intended to be used in the ECAC Region as a primary means of navigation for all phases of flight down to CAT-I. EGNOS Test Bed signals are delivered since early 1999, in support of demonstrations and trials in Europe, Africa, South America and interoperability trials with US (WAAS) and Japan (MSAS). EGNOS AOC is planned to enter into operations in mid 2003. EGNOS is a project defined and promoted by the European Tripartite Group composed of the Commission of the European Union, EUROCONTROL and ESA, with the key participation of the French Space Agency (CNES), the Norwegian Mapping Authority (NMA), and main European Air Traffic Management service providers like AENA (E), NAV-EP (P), DFS (D), ENAV (I), DGAC (F), NATS (UK) and swiss control (CH). The European Space Agency, through implementation of its ARTES Element-9 Programme is responsible for the EGNOS AOC system development, deployment and qualification. ESA has, to that purpose, awarded a contract to a European Consortium led by Alcatel Space Industries (France) with the participation of European and Canadian industries leaders in the fields of satellite technology, navigation and Air Traffic Management systems. EGNOS is a key element in the European strategy for the development of GNSS, designed to be interoperable with other Satellite based augmentation systems and aiming at contributing to a true worldwide global satellite navigation system for civil use. (orig.)

  15. Status of national CO{sub 2}-mitigation projects and initiatives in the Philippine energy sector

    Energy Technology Data Exchange (ETDEWEB)

    Tupas, C.T.

    1996-12-31

    The Philippines has a huge energy requirement for the next 30 years in order to achieve its economic growth target. Based on an expected annual GDP growth rate of 6.9 percent, the Philippines total energy requirement is estimated to increase at an average of 6.6 percent annually from 1996 to 2025. Gross energy demand shall increase from 219.0 million barrels of fuel oil equivalent (MMBFOE) in 1996 to 552.4 MMBFOE in 2010 and 1,392.6 MMBFOE by 2025. These energy demand levels shall be driven primarily by the substantial increase in fuel requirements for power generation whose share of total energy requirement is 28.3 percent in 1996, 48.0 percent in 2010 and 55.0 percent in 2025. With the expected increase in energy demand, there will necessarily be adverse impacts on the environment. Energy projects and their supporting systems - from fuel extraction and storage to distribution - can and will be major contributors not only to local but also to regional and global environmental pollution and degradation. International experiences and trends in greenhouse gas (GHG) emissions inventory have shown that the energy sector has always been the dominant source of carbon dioxide (CO{sub 2}) - the principal contributor to global climate change. The energy sector`s CO{sub 2} emissions come primarily from fossil fuels combustion. Since energy use is the dominant source of CO{sub 2} emissions, efforts should therefore be concentrated on designing a mitigation strategy in this sector.

  16. Present status of edible oil consumption and household demand projection for Tamil Nadu (India

    Directory of Open Access Journals (Sweden)

    Govindaraj Gurrappanaidu

    2012-01-01

    Full Text Available Until the 1990s the major edible oil consumed in Tamil Nadu state was peanut and sesame oil. The technological, economic and policy changes thereafter induced dynamism in consumer demand for food, including edible oils. In this study, the household demand for individual edible oils based on present consumption was assessed and forecasted for 2015 and 2020 for Tamil Nadu. Due to constraints in the secondary data published by National Sample Survey Organisation (NSSO, the primary data was used. The Almost Ideal Demand System (AIDS model was employed to estimate the income (expenditure elasticities and in turn used to project the demand for edible oils and associated products like ghee and butter. The overall edible oil demand is expected to grow at 7.0% per annum in Tamil Nadu, with the highest growth of sunflower oil (8.7% followed by other oils (7.8%, sesame oil (6.6%, peanut oil (6.6% and palm oil (3.1%. The demand for total edible oil in rural Tamil Nadu increases from 3.14 lakh tonnes (2009-10 to 5.3 lakh tonnes (2020, whereas, in urban areas, it increases from 3.24 lakh tonnes to 5.45 lakh tonnes. The non-traditional oil like sunflower oil and other oils (soybean, corn, rice bran, palm oil has made inroads in the consumption basket and will continue to dominate in the future. Hence, concerted efforts like increasing seed replacement rate, increasing the intensity of adoption of improved technology and appropriate price policy are required to increase productivity of non-traditional crops besides promoting traditional crops (peanut and sesame to meet the growing edible oil demand in the state.

  17. Quarterly coal report, July--September 1997

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-02-01

    The Quarterly Coal Report (QCR) provides comprehensive information about US coal production, distribution, exports, imports, receipts, prices, consumption, and stocks. Coke production consumption, distribution, imports, and exports data are also provided. This report presents detailed quarterly data for July through September 1997 and aggregated quarterly historical data for 1991 through the second quarter of 1997. Appendix A displays, from 1991 on, detailed quarterly historical coal imports data. 72 tabs.

  18. Cogeneration and Small Power Production Quarterly Report to the California Public Utilities Commission Third Quarter 1983

    Energy Technology Data Exchange (ETDEWEB)

    None

    1983-01-01

    In the Third Quarter of 1983, the number of signed contracts and committed projects rose from 240 to 258, with a total estimated nominal capacity of these projects of 1,547 MW. Of this nominal capacity, about 416 MW is operational, and the balance is under contract for development. A map indicating the location of operational facilities under contract with PG and E is provided. Of the 258 signed contracts and committed projects, 83 were cogeneration, solid waste, or biomass projects with a potential of 779 MW. PG and E also had under active discussion 38 cogeneration projects that could generate a total of 797 MW to 848 MW, and 19 solid waste/biomass projects with a potential of 152 MW to 159 MW. Two contracts have been signed with geothermal projects, capable of producing 83 MW. There are 6 solar projects with signed contracts and a potential of 36 MW, as well as 3 solar projects under active discussion for 31 MW. Wind farm projects under contract number 21, with a generating capability of 528 MW. Also, discussions are being conducted with 17 wind farm projects, totaling 257 to 262 MW. There are 94 wind projects of 100 kW or less with signed contracts and a potential of almost 1 MW, as well as 8 other small wind projects under active discussion. There are 50 hydroelectric projects with signed contracts and a potential of 112 MW, as well as 67 projects under active discussion for 175 MW. In addition, there are 31 hydroelectric projects, with a nominal capacity of 185 MW, that PG and E is planning to construct.

  19. Cogeneration and Small Power Production Quarterly Report to the California Public Utilities Commission Third Quarter 1983

    Energy Technology Data Exchange (ETDEWEB)

    None

    1983-01-01

    In the Third Quarter of 1983, the number of signed contracts and committed projects rose from 240 to 258, with a total estimated nominal capacity of these projects of 1,547 MW. Of this nominal capacity, about 416 MW is operational, and the balance is under contract for development. A map indicating the location of operational facilities under contract with PG and E is provided. Of the 258 signed contracts and committed projects, 83 were cogeneration, solid waste, or biomass projects with a potential of 779 MW. PG and E also had under active discussion 38 cogeneration projects that could generate a total of 797 MW to 848 MW, and 19 solid waste/biomass projects with a potential of 152 MW to 159 MW. Two contracts have been signed with geothermal projects, capable of producing 83 MW. There are 6 solar projects with signed contracts and a potential of 36 MW, as well as 3 solar projects under active discussion for 31 MW. Wind farm projects under contract number 21, with a generating capability of 528 MW. Also, discussions are being conducted with 17 wind farm projects, totaling 257 to 262 MW. There are 94 wind projects of 100 kW or less with signed contracts and a potential of almost 1 MW, as well as 8 other small wind projects under active discussion. There are 50 hydroelectric projects with signed contracts and a potential of 112 MW, as well as 67 projects under active discussion for 175 MW. In addition, there are 31 hydroelectric projects, with a nominal capacity of 185 MW, that PG and E is planning to construct.

  20. Cogeneration and Small Power Production Quarterly Report to the California Public Utilities Commission First Quarter 1984

    Energy Technology Data Exchange (ETDEWEB)

    None

    1984-01-01

    At the end of the First Quarter of 1984, the number of signed contracts and letter agreements for cogeneration and small power production projects was 322, with a total estimated nominal capacity of 2,643 MW. Of these totals, 215 projects, capable of producing 640 MW, are operational. A map indicating the location of operational facilities under contract with PG and E is provided. Developers of cogeneration, solid waste, or biomass projects had signed 110 contracts with a potential of 1,467 MW. In total, 114 contracts and letter agreements had been signed with projects capable of producing 1,508 MW. PG and E also had under active discussion 35 cogeneration projects that could generate a total of 425 MW to 467 MW, and 11 solid waste or biomass projects with a potential of 94 MW to 114 MW. One contract had been signed for a geothermal project, capable of producing 80 MW. There were 7 solar projects with signed contracts and a potential of 37 MW, as well as 5 solar projects under active discussion for 31 MW. Wind farm projects under contract numbered 32, with a generating capability of 848 MW. Also, discussions were being conducted with 18 wind farm projects, totaling 490 MW. There were 101 wind projects of 100 kW or less with signed contracts and a potential of 1 MW, as well as 6 other small wind projects under active discussion. There were 64 hydroelectric projects with signed contracts and a potential of 148 MW, as well as 75 projects under active discussion for 316 MW. In addition, there were 31 hydroelectric projects, with a nominal capacity of 187 MW, that Pg and E was planning to construct.

  1. Evaluation of conducting a screening assessment of nutritional status of hospitalized patients. Presentation of main goals and objectives of the global health project "NutritionDay".

    Science.gov (United States)

    Jeznach-Steinhagen, Anna; Ostrowska, Joanna; Czerwonogrodzka-Senczyna, Aneta

    2016-01-01

    European Society for Clinical Nutrition and Metabolism (ESPEN) commenced in 2004 a global health project named "NutritionDay" aiming to promote awareness of proper nutritional status of hospitalized patients and to draw attention to the need for early detection of malnutrition among patients. Under the Polish law--pursunat to the regulation of the Minister of Health dated September 15, 2011 (amendment as of 27.12.2013)--a nutritional status of each patient should be assessed at the time of a hospital admission. of this study was to analyze the fulfilment of the mandatory questionnaire assessment of nutritional status at selected wards of one of Warsaw's clinical hospitals. The study included an analysis of medical records of patients hospitalized within 6 months (n = 26375). The correct fulfilment of screening questionnaire assessing nutritional status (NRS 2002 survey) and the information about patients' body weight as well as the results assessment of nutritional status were subject to the analysis. NRS 2002 questionnaire was present in only 67,14% medical records of patients, however 49.24% of them were unfilled. The obtained results confirming low degree of NRS 2002 questionnaires' fulfilment in one of the Warsaw clinical hospitals draws attention to the need for education of hospital personnel in the field of significance of screening of nutritional assessment and its regulations. The "NutritionDay" project is an interesting form to attract attention of the aforementioned problem and its global extent additionally encourage medical units to participate in the project.

  2. The University of Tokyo Atacama Observatory 6.5m telescope: project overview and current status

    Science.gov (United States)

    Yoshii, Y.; Doi, M.; Kohno, K.; Miyata, T.; Motohara, K.; Kawara, K.; Tanaka, M.; Minezaki, T.; Sako, S.; Morokuma, T.; Tamura, Y.; Tanabe, T.; Takahashi, H.; Konishi, M.; Kamizuka, T.; Kato, N.; Aoki, T.; Soyano, T.; Tarusawa, K.; Handa, T.; Koshida, S.; Bronfman, L.; Ruiz, M. T.; Hamuy, M.; Garay, G.

    2016-07-01

    The University of Tokyo Atacama Observatory Project is to construct a 6.5m infrared telescope at the summit of Co. Chajnantor (5640m altitude) in northern Chile, promoted by the University of Tokyo. Thanks to the dry climate (PWV 0.5mm) and the high altitude, it will achieve excellent performance in the NIR to MIR wavelengths. The telescope has two Nasmyth foci where the facility instruments are installed and two folded-Cassegrain foci for carry-in instruments. All these four foci can be switched by rotating a tertiary mirror. The final focal ratio is 12.2 and the telescope foci have large field-of-view of 25° in diameter. We adopted the 6.5m light-weighted borosilicate honeycomb primary mirror and its support system that are developed by Steward Observatory Richard F. Caris Mirror Lab. The dome enclosure has the shape of carousel, and large ventilation windows with shutters control the wind to flush heat inside the dome. The operation building with control room, aluminizing chamber and maintenance facilities is located at the side of the dome. Two cameras, SWIMS for spectroscopy and imaging in the near-infrared and MIMIZUKU in the mid-infrared, are being developed as the first-generation facility instruments. The operation of the telescope will be remotely carried out from a base facility at San Pedro de Atacama, 50km away from the summit. The construction of the telescope is now underway. Fabrication of the telescope mount has almost finished, and the pre-assembly has been carried out in Japan. The primary, secondary, and tertiary mirrors and their cells have been also fabricated, as well as their cells and support systems. Fabrication of the enclosure is now underway, and their pre-assembly in Japan will be carried out in 2016. Construction of the base facility at San Pedro de Atacama has been already completed in 2014, and operated for the activities in Atacama. The telescope is now scheduled to see the first light at the beginning of 2018.

  3. Are physical activity interventions equally effective in adolescents of low and high socio-economic status (SES) : results from the European Teenage project

    NARCIS (Netherlands)

    De Bourdeaudhuij, I.; Simon, C.; De Meester, F.; Van Lenthe, F.; Spittaels, H.; Lien, N.; Faggiano, F.; Mercken, L.; Moore, L.; Haerens, L.

    2011-01-01

    The aim was to study whether physical activity (PA) interventions in European teenagers are equally effective in adolescents of low versus high socio-economic status (SES). Based on a systematic review (Project TEENAGE), three school-based studies for secondary analyses were selected. SES stratified

  4. Are Physical Activity Interventions Equally Effective in Adolescents of Low and High Socio-Economic Status (SES): Results from the European Teenage Project

    Science.gov (United States)

    De Bourdeaudhuij, I.; Simon, C.; De Meester, F.; Van Lenthe, F.; Spittaels, H.; Lien, N.; Faggiano, F.; Mercken, L.; Moore, L.; Haerens, L.

    2011-01-01

    The aim was to study whether physical activity (PA) interventions in European teenagers are equally effective in adolescents of low versus high socio-economic status (SES). Based on a systematic review (Project TEENAGE), three school-based studies for secondary analyses were selected. SES stratified analyses were run in: (i) a Belgian…

  5. Silicon-on ceramic process. Silicon sheet growth and device development for the large-area silicon sheet and cell development tasks of the low-cost solar array project. Quarterly report No. 12, April 2, 1979-June 29, 1979

    Energy Technology Data Exchange (ETDEWEB)

    Chapman, P.W.; Zook, J.D.; Heaps, J.D.; Grung, B.L.; Koepke, B.; Schuldt, S.B.

    1979-07-31

    The objective of this research program is to investigate the technical and economic feasibility of producing solar-cell-quality sheet silicon. We plan to do this by coating one surface of carbonized ceramic substrates with a thin layer of large-grain polycrystalline silicon from the melt. During the quarter, significant progress was demonstrated in several areas: (1) a 10-cm/sup 2/ cell having 9.9 percent conversion efficiency (AM1, AR) was fabricated; (2) the Honeywall-sponsored SCIM coating development succeeded in producing a 225-cm/sup 2/ layer of sheet silicon (18 inches x 2 inches); and (3) 100 ..mu..m-thick coatings at pull speed of 0.15 cm/sec wer$obta9ned, although apoproximately 50 percent of the layer exhibited dendritic growth. Other results and accomplishments during the quarter are reported in detail. (WHK)

  6. The AMTEX Partnership. Third quarter report

    Energy Technology Data Exchange (ETDEWEB)

    1994-06-01

    The AMTEX Partnership is a collaborative research and development program among the U.S. Integrated Textile Industry, the Department of Energy, The DOE laboratories, other federal agencies and laboratories, and universities. The goal of AMTEX is to strengthen the competitiveness of this vital U.S. industry and thereby preserve and create American jobs. During the third quarter of 1994 all the Cooperative Research and Development Agreements (CRADAs) were completed and work initiated for three additional projects: Computer Aided Fabric Evaluation (CAFE), Textile Resource Conservation (TReC), and Sensors for Agile Manufacturing (SFAM). The plan for a Cotton Biotechnology project was completed and reviewed by the Industry Technical Advisory Committee. In addition, an `impact study` on the topic of flexible fiber production was conducted by an industry group led by the fiber manufacturers.

  7. In Situ Mercury Stabilization (ISMS) Treatment: Technology Maturation Project Phase I Status Report

    Energy Technology Data Exchange (ETDEWEB)

    Kalb,P.D.; Milian, L.

    2008-03-01

    technology. If further developed it has the potential for large-scale in-situ treatment of contaminated soils that could substantially reduce the prohibitive cost of thermal desorption and/or excavation and disposal. Licensing and spin-off technology development opportunities would then be viable. Depending on performance and regulatory acceptance, the treated mercury could either be excavated for disposal elsewhere or left in place as a stable alternative. Excavated spent treatment rods could be processed by the SPSS process to reduce the potential for dispersion and lower leachability even further. The Phase I objectives of the In Situ Mercury Stabilization Treatment Process Technology Maturation Project were to: (1) replicate the original bench-scale results that formed the basis for BNL's patent application, i.e., mercury contamination in soil will migrate to and react with 'rods' containing sulfur and/or sulfur compounds, (2) provide enough information to evaluate a decision to conduct further development, and (3) establish some of the critical parameters that require further technology maturation during Phase II. The information contained in this report summarizes the work conducted in Phase I to meet these objectives.

  8. The Iceland Deep Drilling Project (IDDP): (I) Status and Future Plans.

    Science.gov (United States)

    Elders, W. A.; Fridleifsson, G. O.; Bird, D. K.; Schiffman, P.; Zierenberg, R.; Reed, M. H.

    2006-12-01

    drilling. The industrial consortium will fund the >20 million USD cost of drilling and the US National Science Foundation and the International Continental Scientific Drilling Program will jointly fund the coring and sampling for scientific studies. Research by a team of approximately 50 scientists from seven countries is underway; the US investigators are reporting some initial studies at Reykjanes and Krafla in a series of accompanying papers. In the coming decade the IDDP will drill a series of deep holes in Icelandic geothermal fields, including a return to the seawater system at Reykjanes. In addition to exploring for new sources of energy, this project will provide the first opportunity worldwide to investigate the coupling of hydrothermal and magmatic processes in volcanic systems on a mid-ocean ridge. This will allow a broad array of scientific studies involving water/rock reactions at high temperatures. Supercritical fluids have greatly enhanced rates of mass transfer and chemical reaction. Active processes in such deep high-temperature reaction zones that control fluid compositions on mid-ocean ridges have never before been available for such comprehensive direct sampling and study.

  9. Status and understanding of groundwater quality in the Klamath Mountains study unit, 2010: California GAMA Priority Basin Project

    Science.gov (United States)

    Bennett, George Luther; Fram, Miranda S.; Belitz, Kenneth

    2014-01-01

    Groundwater quality in the Klamath Mountains (KLAM) study unit was investigated as part of the Priority Basin Project of the California Groundwater Ambient Monitoring and Assessment (GAMA) Program. The study unit is located in Del Norte, Humboldt, Shasta, Siskiyou, Tehama, and Trinity Counties. The GAMA Priority Basin Project is being conducted by the California State Water Resources Control Board in collaboration with the U.S. Geological Survey (USGS) and the Lawrence Livermore National Laboratory. The GAMA Priority Basin Project was designed to provide a spatially unbiased, statistically robust assessment of the quality of untreated (raw) groundwater in the primary aquifer system. The assessment is based on water-quality data and explanatory factors for groundwater samples collected in 2010 by the USGS from 39 sites and on water-quality data from the California Department of Public Health (CDPH) water-quality database. The primary aquifer system was defined by the depth intervals of the wells listed in the CDPH water-quality database for the KLAM study unit. The quality of groundwater in the primary aquifer system may be different from that in the shallower or deeper water-bearing zones; shallow groundwater may be more vulnerable to surficial contamination. This study included two types of assessments: (1) a status assessment, which characterized the status of the current quality of the groundwater resource by using data from samples analyzed for volatile organic compounds, pesticides, and naturally occurring inorganic constituents, such as major ions and trace elements, and (2) an understanding assessment, which evaluated the natural and human factors potentially affecting the groundwater quality. The assessments were intended to characterize the quality of groundwater resources in the primary aquifer system of the KLAM study unit, not the quality of treated drinking water delivered to consumers by water purveyors. Relative-concentrations (sample concentrations

  10. An assessment of health status among medical research volunteers who served in the Project Whitecoat program at Fort Detrick, Maryland.

    Science.gov (United States)

    Pittman, Phillip R; Norris, Sarah L; Coonan, Kevin M; McKee, Kelly T

    2005-03-01

    Between 1954 and 1973, more than 2000 men entering military service as conscientious objectors participated in Project Whitecoat as medical research volunteers for the Army's biological warfare defense program. An assessment of self-reported, current health status among 358 "exposed" individuals and 164 unexposed control subjects found no conclusive evidence that receipt of investigational agents was related to adverse health outcomes. No differences in current overall health, current exercise levels, self-reported symptoms, and self-reported medical conditions were seen between the study groups. Possible associations were seen between exposure to antibiotics or other biological agents and self-reported asthma (13.0% vs. 2.4%, relative risk [RR] = 6.00, 95% confidence interval [CI] = 1.03-34.90, p = 0.050), as well as between receipt of tularemia vaccine(s) and self-reported asthma (13.3% vs. 2.4%, RR = 6.15, 95% CI = 1.03-36.70, p = 0.049) and increased frequency/severity of headaches (35.6% vs. 18.3%, RR = 2.46, 95% CI = 0.99-6.15, p = 0.074). However, the size of the population under study was insufficient to assert with confidence that these statistical associations are real.

  11. Status of the Next European Dipole (NED) Activity of the Collaborated Accelerator Research in Europe (CARE) Project

    CERN Document Server

    Devred, Arnaud; Baynham, D Elwyn; Boutboul, T; Canfer, S; Chorowski, M; den Ouden, A; Fabbricatore, P; Farinon, S; Fessia, P; Fydrych, J; Félice, H; Greco, Michela; Greenhalgh, J; Leroy, D; Loveridge, P W; Michel, F; Oberli, L R; Pedrini, D; Polinski, J; Previtali, V; Quettier, L; Rifflet, J M; Rochford, J; Rondeaux, F; Sanz, S; Sgobba, Stefano; Sorbi, M; Toral-Fernandez, F; Van Weelderen, R; Vincent-Viry, O; Volpini, G; Védrine, P

    2005-01-01

    Plans for LHC upgrade and for the final focalization of linear colliders call for large aperture and/or high-performance dipole and quadrupole magnets that may be beyond the reach of conventional NbTi magnet technology. The Next European Dipole (NED) activity was launched on January 1st, 2004 to promote the development of high-performance, Nb3Sn wires in collaboration with European industry (aiming at a non-copper critical current density of 1500 A/mm2 at 4.2 K and 15 T) and to assess the suitability of Nb3Sn technology to the next generation of accelerator magnets (aiming at an aperture of 88 mm and a conductor peak field of 15 T). It is integrated within the Collaborated Accelerator Research in Europe (CARE) project, involves seven collaborators, and is partly funded by the European Union. We present here an overview of the NED activity and we report on the status of the various work packages it encompasses.

  12. Status Report on the Development of Micro-Scheduling Software for the Advanced Outage Control Center Project

    Energy Technology Data Exchange (ETDEWEB)

    Germain, Shawn St. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Thomas, Kenneth [Idaho National Lab. (INL), Idaho Falls, ID (United States); Farris, Ronald [Idaho National Lab. (INL), Idaho Falls, ID (United States); Joe, Jeffrey [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2014-09-01

    The long-term viability of existing nuclear power plants (NPPs) in the United States (U.S.) is dependent upon a number of factors, including maintaining high capacity factors, maintaining nuclear safety, and reducing operating costs, particularly those associated with refueling outages. Refueling outages typically take 20-30 days, and for existing light water NPPs in the U.S., the reactor cannot be in operation during the outage. Furthermore, given that many NPPs generate between $1-1.5 million/day in revenue when in operation, there is considerable interest in shortening the length of refueling outages. Yet, refueling outages are highly complex operations, involving multiple concurrent and dependent activities that are difficult to coordinate. Finding ways to improve refueling outage performance while maintaining nuclear safety has proven to be difficult. The Advanced Outage Control Center project is a research and development (R&D) demonstration activity under the Light Water Reactor Sustainability (LWRS) Program. LWRS is a R&D program which works with industry R&D programs to establish technical foundations for the licensing and managing of long-term, safe, and economical operation of current NPPs. The Advanced Outage Control Center project has the goal of improving the management of commercial NPP refueling outages. To accomplish this goal, this INL R&D project is developing an advanced outage control center (OCC) that is specifically designed to maximize the usefulness of communication and collaboration technologies for outage coordination and problem resolution activities. This report describes specific recent efforts to develop a capability called outage Micro-Scheduling. Micro-Scheduling is the ability to allocate and schedule outage support task resources on a sub-hour basis. Micro-Scheduling is the real-time fine-tuning of the outage schedule to react to the actual progress of the primary outage activities to ensure that support task resources are

  13. Status Report for Remediation Decision Support Project, Task 1, Activity 1.B – Physical and Hydraulic Properties Database and Interpretation

    Energy Technology Data Exchange (ETDEWEB)

    Rockhold, Mark L.

    2008-09-26

    The objective of Activity 1.B of the Remediation Decision Support (RDS) Project is to compile all available physical and hydraulic property data for sediments from the Hanford Site, to port these data into the Hanford Environmental Information System (HEIS), and to make the data web-accessible to anyone on the Hanford Local Area Network via the so-called Virtual Library. In past years efforts were made by RDS project staff to compile all available physical and hydraulic property data for Hanford sediments and to transfer these data into SoilVision{reg_sign}, a commercial geotechnical software package designed for storing, analyzing, and manipulating soils data. Although SoilVision{reg_sign} has proven to be useful, its access and use restrictions have been recognized as a limitation to the effective use of the physical and hydraulic property databases by the broader group of potential users involved in Hanford waste site issues. In order to make these data more widely available and useable, a decision was made to port them to HEIS and to make them web-accessible via a Virtual Library module. In FY08 the objectives of Activity 1.B of the RDS Project were to: (1) ensure traceability and defensibility of all physical and hydraulic property data currently residing in the SoilVision{reg_sign} database maintained by PNNL, (2) transfer the physical and hydraulic property data from the Microsoft Access database files used by SoilVision{reg_sign} into HEIS, which has most recently been maintained by Fluor-Hanford, Inc., (3) develop a Virtual Library module for accessing these data from HEIS, and (4) write a User's Manual for the Virtual Library module. The development of the Virtual Library module was to be performed by a third party under subcontract to Fluor. The intent of these activities is to make the available physical and hydraulic property data more readily accessible and useable by technical staff and operable unit managers involved in waste site assessments

  14. Status and understanding of groundwater quality in the San Diego Drainages Hydrogeologic Province, 2004: California GAMA Priority Basin Project

    Science.gov (United States)

    Wright, Michael T.; Belitz, Kenneth

    2011-01-01

    Groundwater quality in the approximately 3,900-square-mile (mi2) San Diego Drainages Hydrogeologic Province (hereinafter San Diego) study unit was investigated from May through July 2004 as part of the Priority Basin Project of the Groundwater Ambient Monitoring and Assessment (GAMA) Program. The study unit is located in southwestern California in the counties of San Diego, Riverside, and Orange. The GAMA Priority Basin Project is being conducted by the California State Water Resources Control Board in collaboration with the U.S. Geological Survey (USGS) and the Lawrence Livermore National Laboratory. The GAMA San Diego study was designed to provide a statistically robust assessment of untreated-groundwater quality within the primary aquifer systems. The assessment is based on water-quality and ancillary data collected by the USGS from 58 wells in 2004 and water-quality data from the California Department of Public Health (CDPH) database. The primary aquifer systems (hereinafter referred to as the primary aquifers) were defined by the depth interval of the wells listed in the California Department of Public Health (CDPH) database for the San Diego study unit. The San Diego study unit consisted of four study areas: Temecula Valley (140 mi2), Warner Valley (34 mi2), Alluvial Basins (166 mi2), and Hard Rock (850 mi2). The quality of groundwater in shallow or deep water-bearing zones may differ from that in the primary aquifers. For example, shallow groundwater may be more vulnerable to surficial contamination than groundwater in deep water-bearing zones. This study had two components: the status assessment and the understanding assessment. The first component of this study-the status assessment of the current quality of the groundwater resource-was assessed by using data from samples analyzed for volatile organic compounds (VOC), pesticides, and naturally occurring inorganic constituents, such as major ions and trace elements. The status assessment is intended to

  15. Strengthening HIV Test Access and Treatment Uptake Study (Project STATUS): A Randomized Trial of HIV Testing and Counseling Interventions

    Science.gov (United States)

    McNaghten, A. D.; Mneimneh, Allison Schilsky; Farirai, Thato; Wamai, Nafuna; Ntiro, Marylad; Sabatier, Jennifer; Makhunga-Ramfolo, Nondumiso; Mwanasalli, Salli; Awor, Anna; Moore, Jan

    2016-01-01

    Objective To determine which of 3 HIV testing and counseling (HTC) models in outpatient departments (OPDs) increases HIV testing and entry of newly identified HIV-infected patients into care. Design Randomized trial of HTC interventions. Methods Thirty-six OPDs in South Africa, Tanzania, and Uganda were randomly assigned to 3 different HTC models: (A) health care providers referred eligible patients (aged 18–49, not tested in the past year, not known HIV positive) to on-site voluntary counseling and testing for HTC offered and provided by voluntary counseling and testing counselors after clinical consultation; (B) health care providers offered and provided HTC to eligible patients during clinical consultation; and (C) nurse or lay counselors offered and provided HTC to eligible patients before clinical consultation. Data were collected from October 2011 to September 2012. We describe testing eligibility and acceptance, HIV prevalence, and referral and entry into care. Chi-square analyses were conducted to examine differences by model. Results Of 79,910 patients, 45% were age eligible and 16,099 (45%) age eligibles were tested. Ten percent tested HIV positive. Significant differences were found in percent tested by model. The proportion of age eligible patients tested by Project STATUS was highest for model C (54.1%, 95% confidence interval [CI]: 42.4 to 65.9), followed by model A (41.7%, 95% CI: 30.7 to 52.8), and then model B (33.9%, 95% CI: 25.7 to 42.1). Of the 1596 newly identified HIV positive patients, 94% were referred to care (96.1% in model A, 94.7% in model B, and 94.9% in model C), and 58% entered on-site care (74.4% in model A, 54.8% in model B, and 55.6% in model C) with no significant differences in referrals or care entry by model. Conclusions Model C resulted in the highest proportion of all age-eligible patients receiving a test. Although 94% of STATUS patients with a positive test result were referred to care, only 58% entered care. We found no

  16. Status of Standardization Projects

    Science.gov (United States)

    1994-06-30

    943 G MI U 6850 1137 A-A-52119 TABLET CHLORINE FLOCULATING GL F2 941 952 952 A GL MC 68 GS N 6850 1138 A-A-52122 KIT WTR PUR EMERGENCY GL F2 941 952...TABLET CHLORINE FLOCULATING GL F2 941 952 952 A GL MC 68 GS N 6850 1138 A-A-52122 KIT WTR PUR EMERGENCY GL F2 941 952 952 A GL MC 68 GS N 7105 0267

  17. Status of Standardization Projects

    Science.gov (United States)

    1993-12-31

    Y - 0 , Z - 0 6645 0408 MIL C 87979 CLOCK AIRCRAFT ELECTRONIC 82 D1 902 912 912 A AR AS 99 N C 6645 0415 MIL W 22176A 4 WATCH WRIST SUBMERSIBLE SH...H5 931 951 Z SH 99 N A 6645 0416 MIL C 23339 2 CLOCK ELECTRIC INTERNALLY SH H5 931 951 Z SH 99 N A 6645 0423 MIL-W-46374F WATCH WRIST GEN AMND I AR Al...TUNIC AND SLAC CT 02 934 934 944 944 A GL NU 11 N 8410 0830 A-A-XXXXX SLACKS MATERNITY UTILITY CT F4 A 934 934 944 944 A GL 11 N 8410 0831 A-A-50365A

  18. Status of Standardization Projects

    Science.gov (United States)

    1993-12-31

    MS9317 IS Fr 934 942 942 A N 5305 2015 MS9449 IS F5 934 942 942 A N 5305 2016 MS9450 IS FE 934 942 942 A N 5305 2017 MS9516 iS FE 934 942 942 A N 5305...CP 922 934 934 A NO 09 N M:GT 0020 MIL-T-89101 TACTICAL PILOTAGE CHART MP F4 CP 903 903 923 944 A NO 09 MD U MCCG 0021 MIL-O-89102 OPERATIONAL

  19. Status of Standardization Projects

    Science.gov (United States)

    1993-06-30

    1340 N897 MIL-P-82790 PROPELLANT GRN RADIGRPH INSP OS H5 931 934 934 A OS N • 1340 N899 MIL-B-82792 BROAOGOODS CRBN CLTH PHENOLI OS H5 931 934 934 A...1340 N897 MIL-P-82790 PROPELLANT GRN RADIGRPH INSP OS H5 931 934 934 A OS N 1340 N899 MIL-B-82792 BROADGOODS CRBN CLTH PHENOLI OS H5 931 934 934 A OS N...OS N 1340 N899 MIL-B-82792 BROADGOODS CRBN CLTH PHENOLI OS H5 931 934 934 A OS N 1340 N910 MIL-F-82795 FLONT PULP ASBESTOS OS H5 931 934 934 A OS N

  20. Status of Standardization Projects

    Science.gov (United States)

    1992-09-30

    NEOMYCIN SUSPENSION MB ON H5 914 924 924 A MO MS 03 N C6505 5571 JAN P 567 PIGMENT SYNTHETIC BLACK EA B2 914 922 921 A MD MS 03 DP U 6505 5585 NIL T 37689...MCA uL G2 923 924 923 G GL SA 69 GS U 8135 0658 A-A-1252A PAD MEAT AND POULTRY PAPER MCA 3L G2 924 931 931 A GL SA N 0 8135 0659 A-A-1245A-01 PAPER...MCA GL G? 923 924 923 G GL SA 69 GS Ui 8135 0658 A-A-1252A PAD MEAT AND POULTRY PAPER MCA GL G2 924 931 931 A GL SA N U 8135 0659 A-A-1245A-01 PAPER

  1. Status of Standardization Projects

    Science.gov (United States)

    1992-03-31

    SRR T YT YT T RT S D 5935 3805 01 MIL C 55302 26 CONN ELEC PLUG CR ES A2 903 913 922 A CR EC 17 U B 5935 3805 02 MIL C 55302 27 CONN EIEC RECEPTACLE CR...931 931 A CR EC 85 N 5935 3848 13 MIL-R-RRRRR/63 CONN PLUG ELEC RF COAX CR ES A4 912 931 931 A CR EC 85 N 5935 3848 14 MIL-C-RRRRR/64 CONN RECEPT EiEC

  2. Status of Standardization Projects

    Science.gov (United States)

    1991-06-30

    Z AV AS 11 N 3120 0715 MIL B 8943A BEARINGS JOURNAL PLAIN AS R2 933 953 Z AV AS 11 N 3120 0716 MIL B 8942A BEARING PLAIN TFE LINED AS R2 933 953 Z AV...VIBRATOR, MOLD MB DM F4 A 881 891 914 A MD MS 03 U D 6520 2102 A-A-XXX STOP, ENDODONTIC MB DM F4 A 892 902 914 A MD MS 03 U D 6520 2104 A-A-XXX...BEARINGS PLAIN ROD END TFE AS R2 933 953 Z AV AS 11 N 3120 0715 MIL B 8943A BEARINGS JOURNAL PLAIN AS R2 933 953 Z AV AS 11 N 3120 0716 MIL B 8942A

  3. Status of Standardization Projects

    Science.gov (United States)

    1994-09-01

    873 882 891 A AR 05 99 U B 1376 0333 BIL P 408 PENTOLITE 50/50 AR B4 873 882 891 A AR AS U B 1376 0334 NIL L 757B LEAD STYPHNATE NORMAL AR B2 873 882...366A BARTIUM STEARATE AR D2 872 892 902 A AR OS U B 6810 1017 JAN-M-476B MANGANESE PWD AR D2 872 892 902 A AR OS U B 6810 1018 JAN-B-660A BARIUM ...882 902 A AR AS U B 6810 1028 MIL B 162D BARIUM NITRATE AR B2 873 882 902 A AR AS U B 6810 1029 MIL C 178 CHARCOAL AR B4 873 882 902 A AR OS U B 6810

  4. Status of Standardization Projects

    Science.gov (United States)

    1992-12-31

    YN SRR SRR SRR SRR T YT YT T RT S D 6505 5838 MIL-A-37626 ASPIRIN CAFFEINE MB DM H5 931 941 941 A MD MS 03 N 6505 5839 MIL-H-37730 HYDROGEN PEROXIDE...SHOE MOLDERS NU D4 903 911 932 A CT U 0 8430 0407 A-A-XXXXX OVERSHOE MEN’S DRESS NU F4 914 924 933 A CT U 8430 0409 A-A-55087 SHOES, SWIMMERS CT F4...NU 99 CT U 8430 OAnQ A-A-55087 SHOES, SWIMMERS CT F4 923 923 931 931 G CT U 8430 0410 A-A-XXX FOOTWEAR COVER RADIOACTIVE CT A4 A 923 933 933 A NU 99 CT

  5. Quarterly Technical Progress Report June 2015

    Energy Technology Data Exchange (ETDEWEB)

    Buchholz, Bruce A. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2015-06-08

    The project has two main goals: 1) Identify the types of adducts naphthalene (NA) forms with DNA and 2) determine whether adduct formation correlates with site selective tumor formation in defined subcompartments of the respiratory tract (respiratory and olfactory nasal epithelium and airways of mice, rats and rhesus monkeys). Five tasks are associated with the completion of the goals. Task 1: Contracting and Animal Use Approvals. IACUC and ACURO approvals are complete, The subcontract with UC Davis (UCD) was executed in December 2014. Task 2: Perform In Vitro Study for Goal 1. Rat samples exposed and in freezer while adduct standards are being made. Mouse samples need to be exposed in next quarter. Task 3: Perform In Vitro Study for Goal 2. Mouse ex vivo samples completed. Rat and monkey samples need to be completed in the next quarter. Task 4: Sample Preparation and Analysis. Mouse Goal 2 samples completed. Other samples remain to be done. Task 5: Data Interpretation and Reporting. Need rat data to write paper on adduct formation.

  6. Production of satellite-derived aerosol climate data records: current status of the ESA Aerosol_cci project

    Science.gov (United States)

    de Leeuw, Gerrit; Holzer-Popp, Thomas; Pinnock, Simon

    2015-04-01

    cloud screening in the various algorithms. Other efforts will focus on surface treatment and possible improvement of aerosol models used in the retrieval. Furthermore, the validation results, showing differences between regions, will further be analyzed in an attempt to better understand the working of different algorithms. The results, if successful, will be implemented in the various algorithms. A yearly re-processing is planned to evaluate the effect of different changes and to monitor further improvement. Each re-processing will be done on the full 17-year global ATSR-2/AATSR data set. The work on stratospheric aerosols and on absorbing aerosols is continued and a new element in Phase 2 is the inclusion of dust aerosols retrieved from thermal infrared IASI observations over a limited area. After the launch of Sentinel-3, planned for the autumn of 2015, the aerosol retrieval using SLSTR and OLCI data are planned to be included in the Aerosol_cci project. PARASOL retrieved data over a limited area will be used as a 'standard' for comparison with other sensors. A new aspect of Phase 2 are the use cases where representatives of several relevant users communities, climate, stratospheric aerosol and aerosol-cloud interaction, will evaluate the use of Aerosol_cci products in their own work as regards the usefulness and added value. This will be done in close cooperation with the data providers to further improve the products and meet users' needs, both as regards data quality and presentation. The latter also requires data availability and easy accessibility through good data management which is another important aspect in Aerosol_cci. An overview will be presented of the current status of the various aspects of the Aerosol_cci project.

  7. Environmental Biosciences Quarterly Report

    Energy Technology Data Exchange (ETDEWEB)

    Lawrence C. Mohr, M.D.

    2007-01-31

    In May 2002, the United States Department of Energy (DOE) signed Assistance Instrument Number DE-FC09-02CH11109 with the Medical University of South Carolina (MUSC) to support the Environmental Biosciences Program (EBP). This funding instrument replaces DOE Assistance Instrument Number DE-FC02-98CH10902. EBP is an integrated, multidisciplinary scientific research program, employing a range of research initiatives to identify, study and resolve environmental health risks. These initiatives are consistent with the MUSC role as a comprehensive state-supported health sciences institution and with the nation's need for new and better approaches to the solution of a complex and expansive array of environment-related health problems. The intrinsic capabilities of a comprehensive health sciences institution enable MUSC to be a national resource for the scientific investigation of environmental health issues. EBPs success as a nationally prominent research program is due, in part, to its ability to task-organize scientific expertise from multiple disciplines in addressing these complex problems. Current research projects have focused EBP talent and resources on providing the scientific basis for risk-based standards, risk-based decision making and the accelerated clean-up of widespread environmental hazards. These hazards include trichloroethylene and low-dose ionizing radiation. Work on the trichloroethylene research projects has been slowed as a result of funding uncertainties. The impact of these funding uncertainties has been discussed with the DOE. Plans for restructuring the performance schedule of the trichloroethylene projects have been submitted to the department. A project is also being conducted in the use of geographical information system technology to analyze population health risks related to environmental hazards as a tool for risk-based decision-making. Questions, comments or requests for further information concerning the activities under this

  8. The effects of quarter-individual milking in conventional milking parlours on the somatic cell count and udder health of dairy cows.

    Science.gov (United States)

    Müller, Anika B; Rose-Meierhöfer, Sandra; Ammon, Christian; Brunsch, Reiner

    2013-02-01

    The objective of this study was to examine the quarter health status of quarter-individually and conventionally milked cows. The MultiLactor®, a quarter-individual milking system (MULTI), has single guided tubes which provide milking on the quarter level with a low system vacuum level (37 kPa), sequential pulsation and periodic air inlet. The conventional milking system (CON) was equipped with a milking cluster where the system vacuum level was adjusted to 40 kPa. A total of 84 German Holstein cows, randomly divided into two groups, were included in the study. Over a period of 32 trial weeks, quarter foremilk samples were taken every week to determine somatic cell count (SCC). Bacteriological examinations and udder palpation were conducted at three different times. During the trial period, median SCC of quarter foremilk samples in both groups did not exceed the threshold value of 100,000 cells/ml. The results of the F test showed that the milking system (P = 0.0587) and days in milk (DIM) (P = 0.8066) had no significant effects on the quarter health status. On the other hand, lactation (P = 0.0396), quarter health status in the previous week (P quarter health status significantly. The estimated probabilities of the occurrence of a suspicious quarter (SCC > 100,000 cells/ml) were 19.97% (CON) and 31.72% (MULTI). However, the test of differences in the Least Square Means (LSM) showed no significant differences (P = 0.0585) between CON and MULTI. The estimated probability of quarters becoming suspicious during the first lactation was 12.51% for both groups. With an increasing number of lactation, the probability of a quarter becoming suspicious clearly increased (2nd lactation: 32.73% and 3rd lactation: 36.19%). The results also showed that the percentage of quarters with bacteriological findings revealed a stronger increase over time for MULTI than for CON.

  9. Status and Understanding of Groundwater Quality in the Central-Eastside San Joaquin Basin, 2006: California GAMA Priority Basin Project

    Science.gov (United States)

    Landon, Matthew K.; Belitz, Kenneth; Jurgens, Bryant C.; Justin T. Kulongoski, Justin T.; Johnson, Tyler D.

    2010-01-01

    Groundwater quality in the approximately 1,695-square-mile Central Eastside San Joaquin Basin (Central Eastside) study unit was investigated as part of the Priority Basin Project (PBP) of the Groundwater Ambient Monitoring and Assessment (GAMA) Program. The GAMA PBP was developed in response to the California Groundwater Quality Monitoring Act of 2001, and is being conducted by the California State Water Resources Control Board in collaboration with the U.S. Geological Survey and the Lawrence Livermore National Laboratory. The GAMA Central Eastside study unit was designed to provide a spatially unbiased assessment of untreated-groundwater quality, as well as a statistically consistent basis for comparing water quality throughout California. During March through June 2006, samples were collected from 78 wells in Stanislaus and Merced Counties, 58 of which were selected using a spatially distributed, randomized grid-based method to provide statistical representation of the study unit (grid wells), and 20 of which were sampled to evaluate changes in water chemistry along groundwater-flow paths (understanding wells). Water-quality data from the California Department of Public Health (CDPH) database also were used for the assessment. An assessment of the current status of the groundwater quality included collecting samples from wells for analysis of anthropogenic constituents such as volatile organic compounds (VOCs) and pesticides, as well as naturally occurring constituents such as major ions and trace elements. The assessment of status is intended to characterize the quality of untreated-groundwater resources within the primary aquifer system, not the treated drinking water delivered to consumers by water purveyors. The primary aquifer system (hereinafter, primary aquifer) is defined as that part of the aquifer corresponding to the perforation interval of wells listed in the CDPH database for the Central Eastside study unit. The quality of groundwater in shallower or

  10. The AMTEX Partnership. Third quarterly report, FY 1995

    Energy Technology Data Exchange (ETDEWEB)

    Lemon, D.K.; Quisenberry, R.K. [AMTEX Partnership (United States)

    1995-06-01

    Key activities for the quarter were the initiation of tactical work on the OPCon Project, development of a draft of the AMTEX Policies and Procedures document, and a meeting of the Industry Technical Advisory Committee. A significant milestone was reached when a memorandum of understanding was signed between the DOE and The Department of Commerce. The agreement signified the official participation of the National Institute of Standards and Technology on the Demand Activated Manufacturing Architecture (DAMA) project in AMTEX. Project accomplishments are given for: computer-aided manufacturing, cotton biotechnology, DAMA, electronic embedded fingerprints, rapid cutting, sensors for agile manufacturing, and textile resource conservation.

  11. The AMTEX Partnership. Third quarterly report, FY 1995

    Energy Technology Data Exchange (ETDEWEB)

    Lemon, D.K.; Quisenberry, R.K. [AMTEX Partnership (United States)

    1995-06-01

    Key activities for the quarter were the initiation of tactical work on the OPCon Project, development of a draft of the AMTEX Policies and Procedures document, and a meeting of the Industry Technical Advisory Committee. A significant milestone was reached when a memorandum of understanding was signed between the DOE and The Department of Commerce. The agreement signified the official participation of the National Institute of Standards and Technology on the Demand Activated Manufacturing Architecture (DAMA) project in AMTEX. Project accomplishments are given for: computer-aided manufacturing, cotton biotechnology, DAMA, electronic embedded fingerprints, rapid cutting, sensors for agile manufacturing, and textile resource conservation.

  12. Status and understanding of groundwater quality in the Madera, Chowchilla Study Unit, 2008: California GAMA Priority Basin Project

    Science.gov (United States)

    Shelton, Jennifer L.; Fram, Miranda S.; Belitz, Kenneth; Jurgens, Bryant C.

    2013-01-01

    Groundwater quality in the approximately 860-square-mile Madera and Chowchilla Subbasins (Madera-Chowchilla study unit) of the San Joaquin Valley Basin was investigated as part of the Priority Basin Project of the Groundwater Ambient Monitoring and Assessment (GAMA) Program. The study unit is located in California's Central Valley region in parts of Madera, Merced, and Fresno Counties. The GAMA Priority Basin Project is being conducted by the California State Water Resources Control Board in collaboration with the U.S. Geological Survey (USGS) and the Lawrence Livermore National Laboratory. The Project was designed to provide statistically robust assessments of untreated groundwater quality within the primary aquifer systems in California. The primary aquifer system within each study unit is defined by the depth of the perforated or open intervals of the wells listed in the California Department of Public Health (CDPH) database of wells used for municipal and community drinking-water supply. The quality of groundwater in shallower or deeper water-bearing zones may differ from that in the primary aquifer system; shallower groundwater may be more vulnerable to contamination from the surface. The assessments for the Madera-Chowchilla study unit were based on water-quality and ancillary data collected by the USGS from 35 wells during April-May 2008 and water-quality data reported in the CDPH database. Two types of assessments were made: (1) status, assessment of the current quality of the groundwater resource, and (2) understanding, identification of natural factors and human activities affecting groundwater quality. The primary aquifer system is represented by the grid wells, of which 90 percent (%) had depths that ranged from about 200 to 800 feet (ft) below land surface and had depths to the top of perforations that ranged from about 140 to 400 ft below land surface. Relative-concentrations (sample concentrations divided by benchmark concentrations) were used for

  13. Quarterly coal report, July--September 1998

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-02-01

    The Quarterly Coal Report (QCR) provides comprehensive information about US coal production, distribution, exports, imports, receipts, prices, consumption, and stocks to a wide audience, including Congress, Federal and State agencies, the coal industry, and the general public. Coke production, consumption, distribution, imports, and exports data are also provided. This report presents detailed quarterly data for July through September 1998 and aggregated quarterly historical data for 1992 through the second quarter of 1998. 58 tabs.

  14. Silicon materials task of the Low-Cost Solar Array Project (Phase IV). Effects of impurities and processing on silicon solar cells. Nineteenth quarterly report, April 1980-June 1980

    Energy Technology Data Exchange (ETDEWEB)

    Hopkins, R.H.; Davis, J.R.; Rohatgi, A.; Campbell, R.B.; Rai-Choudhury, P.; Hanes, M.H.; Mollenkopf, H.C.; McCormick, J.R.

    1980-07-01

    The overall objective of this program is to define the effects of impurities, various thermochemical processes, and any impurity-process interactions upon the performance of terrestrial solar cells. The results of the study form a basis for silicon producers, wafer manufacturers, and cell fabricators to develop appropriate cost-benefit relationships for the use of less pure, less costly solar grade silicon. Nine 4 ohm-cm p type silicon ingots were grown and evaluated in support of the experimental program this quarter. Of these, three were polycrystalline ingots doped with Cr, Mo, and V, respectively, produced under conditions which successfully eliminated the metal-rich inclusions formed when growth of these heavily-doped specimens was attempted during the last quarter. Evaluation of polycrystalline ingots doped to the mid 10/sup 13/ cm/sup -3/ range with Ti or V showed little evidence for grain boundary segregation. Deep level spectroscopy on both as-grown wafers and solar cells showed little variation in impurity concentration from place to place across the ingot regardless of the presence of grain boundaries or other structural features. Deep level spectroscopy was also used to monitor the electrically active impurity concentrations in ingots to be used for process studies, aging experiments, and high efficiency cells. The basic aspects of a model to describe efficiency behavior in high efficiency cells have been formulated and a computer routine is being implemented for back field type devices to analyze the functional relationships between impurity concentrations and cell performance.

  15. 10 CFR 34.29 - Quarterly inventory.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Quarterly inventory. 34.29 Section 34.29 Energy NUCLEAR... RADIOGRAPHIC OPERATIONS Equipment § 34.29 Quarterly inventory. (a) Each licensee shall conduct a quarterly physical inventory to account for all sealed sources and for devices containing depleted uranium...

  16. Apprentices & Trainees: September Quarter, 2012

    Science.gov (United States)

    National Centre for Vocational Education Research (NCVER), 2013

    2013-01-01

    This publication presents estimates of apprentice and trainee activity in Australia for the September quarter 2012. The figures in this publication are derived from the National Apprentice and Trainee Collection no.74 (December 2012 estimates). The most recent figures in this publication are estimated (those for training activity from the March…

  17. South African Crime Quarterly 59

    African Journals Online (AJOL)

    SA Crime QuArterly No. 59 • mArCh ... Section 77 of the Criminal Procedure Act 51 of 1977 deals with the treatment of persons who are unable to ..... resource considerations alone.36 .... membership of groups; as demonstrated in. President of ...

  18. Status and understanding of groundwater quality in the Santa Clara River Valley, 2007-California GAMA Priority Basin Project

    Science.gov (United States)

    Burton, Carmen A.; Montrella, Joseph; Landon, Matthew K.; Belitz, Kenneth

    2011-01-01

    Groundwater quality in the approximately 460-square-mile Santa Clara River Valley study unit was investigated from April through June 2007 as part of the Priority Basin Project of the Groundwater Ambient Monitoring and Assessment (GAMA) Program. The GAMA Priority Basin Project is conducted by the U.S. Geological Survey (USGS) in collaboration with the California State Water Resources Control Board and the Lawrence Livermore National Laboratory. The Santa Clara River Valley study unit contains eight groundwater basins located in Ventura and Los Angeles Counties and is within the Transverse and Selected Peninsular Ranges hydrogeologic province. The Santa Clara River Valley study unit was designed to provide a spatially unbiased assessment of the quality of untreated (raw) groundwater in the primary aquifer system. The assessment is based on water-quality and ancillary data collected in 2007 by the USGS from 42 wells on a spatially distributed grid, and on water-quality data from the California Department of Public Health (CDPH) database. The primary aquifer system was defined as that part of the aquifer system corresponding to the perforation intervals of wells listed in the CDPH database for the Santa Clara River Valley study unit. The quality of groundwater in the primary aquifer system may differ from that in shallow or deep water-bearing zones; for example, shallow groundwater may be more vulnerable to surficial contamination. Eleven additional wells were sampled by the USGS to improve understanding of factors affecting water quality.The status assessment of the quality of the groundwater used data from samples analyzed for anthropogenic constituents, such as volatile organic compounds (VOCs) and pesticides, as well as naturally occurring inorganic constituents, such as major ions and trace elements. The status assessment is intended to characterize the quality of untreated groundwater resources in the primary aquifers of the Santa Clara River Valley study unit

  19. Status of groundwater quality in the California Desert Region, 2006-2008: California GAMA Priority Basin Project

    Science.gov (United States)

    Dawson, Barbara J. Milby; Belitz, Kenneth

    2012-01-01

    Groundwater quality in six areas in the California Desert Region (Owens, Antelope, Mojave, Coachella, Colorado River, and Indian Wells) was investigated as part of the Priority Basin Project of the Groundwater Ambient Monitoring and Assessment (GAMA) Program. The GAMA Priority Basin Project is being conducted by the California State Water Resources Control Board in collaboration with the U.S. Geological Survey (USGS) and the Lawrence Livermore National Laboratory. The six Desert studies were designed to provide a spatially unbiased assessment of the quality of untreated groundwater in parts of the Desert and the Basin and Range hydrogeologic provinces, as well as a statistically consistent basis for comparing groundwater quality to other areas in California and across the Nation. Samples were collected by the USGS from September 2006 through April 2008 from 253 wells in Imperial, Inyo, Kern, Los Angeles, Mono, Riverside, and San Bernardino Counties. Two-hundred wells were selected using a spatially distributed, randomized grid-based method to provide a spatially unbiased representation of the study areas (grid wells), and fifty-three wells were sampled to provide additional insight into groundwater conditions (additional wells). The status of the current quality of the groundwater resource was assessed based on data from samples analyzed for volatile organic compounds (VOCs), pesticides, and inorganic constituents such as major ions and trace elements. Water-quality data from the California Department of Public Health (CDPH) database also were incorporated in the assessment. The status assessment is intended to characterize the quality of untreated groundwater resources within the primary aquifer systems of the Desert Region, not the treated drinking water delivered to consumers by water purveyors. The primary aquifer systems (hereinafter, primary aquifers) in the six Desert areas are defined as that part of the aquifer corresponding to the perforation intervals of

  20. Status of groundwater quality in the Upper Santa Ana Watershed, November 2006--March 2007--California GAMA Priority Basin Project

    Science.gov (United States)

    Kent, Robert; Belitz, Kenneth

    2012-01-01

    Groundwater quality in the approximately 1,000-square-mile (2,590-square-kilometer) Upper Santa Ana Watershed (USAW) study unit was investigated as part of the Priority Basin Project of the Groundwater Ambient Monitoring and Assessment (GAMA) Program. The study unit is located in southern California in Riverside and San Bernardino Counties. The GAMA Priority Basin Project is being conducted by the California State Water Resources Control Board in collaboration with the U.S. Geological Survey and the Lawrence Livermore National Laboratory. The GAMA USAW study was designed to provide a spatially unbiased assessment of untreated groundwater quality within the primary aquifer systems in the study unit. The primary aquifer systems (hereinafter, primary aquifers) are defined as the perforation interval of wells listed in the California Department of Public Health (CDPH) database for the USAW study unit. The quality of groundwater in shallower or deeper water-bearing zones may differ from that in the primary aquifers; shallower groundwater may be more vulnerable to surficial contamination. The assessment is based on water-quality and ancillary data collected by the U.S. Geological Survey (USGS) from 90 wells during November 2006 through March 2007, and water-quality data from the CDPH database. The status of the current quality of the groundwater resource was assessed based on data from samples analyzed for volatile organic compounds (VOCs), pesticides, and naturally occurring inorganic constituents, such as major ions and trace elements. The status assessment is intended to characterize the quality of groundwater resources within the primary aquifers of the USAW study unit, not the treated drinking water delivered to consumers by water purveyors. Relative-concentrations (sample concentration divided by the health- or aesthetic-based benchmark concentration) were used for evaluating groundwater quality for those constituents that have Federal or California regulatory or