WorldWideScience

Sample records for quarterly project status

  1. Quarterly status of Department of Energy projects

    International Nuclear Information System (INIS)

    1982-01-01

    This Quarterly Status of Department of Energy Projects is prepared by the Office of project and Facilities Management, MA-30. The report is designed to provide Department of Energy (DOE) management officials with a summary of the important baseline data that exists in the DOE project data base. This data base is maintained chiefly from periodic field management reports required by DOE Order 5700.4. Since most of the current estimates in this report are from field project managers, they do not necessarily have full Headquarters approval. The current budget data sheet estimates that appear in the report are considered appropriate for reporting external to the Department and reflect the President's FY 1983 Budget to Congress. Moneys allocated and estimated costs, and the construction status are tabulated for projects under the subject categories of: conservation and renewable energy; defense programs; environmental protection, safety and emergency preparedness; energy research; defense programs; nuclear energy; and management and administration

  2. Hazardous materials in aquatic environments of the Mississippi River Basin. Quarterly project status report, October 1, 1993--December 31, 1993

    Energy Technology Data Exchange (ETDEWEB)

    1993-12-31

    This quarterly project status report discusses research projects being conducted on hazardous materials in aquatic environments of the Mississippi River basin. We continued to seek improvement in our methods of communication and interactions to support the inter-disciplinary, inter-university collaborators within this program. In addition to the defined collaborative research teams, there is increasing interaction among investigators across projects. Planning for the second year of the project has included the development of our internal request for proposals, and refining the review process for selection of proposals for funding.

  3. NRC quarterly [status] report

    International Nuclear Information System (INIS)

    1987-01-01

    This report covers the third quarter of calendar year 1987. The NRC licensing activity during the period of this report included the issuance of a full-power license for Beaver Valley 2 on August 14, 1987, and operating license restricted to five percent power for South Texas Unit 1 on August 21, 1987. Additional licensing delay for Shoreham is projected due to complex litigation. Also, licensing delay may occur for Comanche Peak Unit 1, because the duration of the hearing is uncertain. Although a license authorizing fuel loading and precriticality testing for Seabrook Unit 1 has been issued, there is a projected delay for low-power licensing. Full-power licensing for Seabrook Unit 1 will be delayed due to offsite emergency preparedness issues. The length of the delay is not known at this time. With the exception of Seabrook and Shoreham, regulatory delays in this report are not impacted by the schedules for resolving off-site emergency preparedness issues

  4. Hazardous materials in aquatic environments of the Mississippi River basin. Quarterly project status report, April 1, 1993--June 30, 1993

    Energy Technology Data Exchange (ETDEWEB)

    1993-08-01

    During this quarter, the Review Panel made its final recommendations regarding which of the proposals should be funded. Included in this report is a brief status report of each of the research and education projects that are currently funded in this project. The Coordinated Instrumentation Facility (CIF) sponsored 3 seminars on Environmental Sample Preparation Techniques. These seminars were designed to educate the investigators on the use of microwave digestion systems for sample preparation and the use of Inductively Coupled Plasma and Atomic Absorption Specrtroscopy for analyses. During this period, Tulane and Xavier Universities have worked closely with Oak Ridge National Laboratories (ORNL) to develop a long term relationship that will encourage interaction and collaborations among the investigators at all of the institutions.

  5. Short-term energy outlook: Quarterly projections, fourth quarter 1997

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-10-14

    The Energy Information Administration (EIA) prepares quarterly short-term energy supply, demand, and price projections for printed publication in January, April, July, and October in the Short-Term Energy Outlook. The details of these projections, as well as monthly updates on or about the 6th of each interim month, are available on the internet at: www.eia.doe.gov/emeu/steo/pub/contents.html. The forecast period for this issue of the Outlook extends from the fourth quarter of 1997 through the fourth quarter of 1998. Values for the fourth quarter of 1997, however, are preliminary EIA estimates (for example, some monthly values for petroleum supply and disposition are derived in part from weekly data reported in EIA`s Weekly Petroleum Status Report) or are calculated from model simulations that use the latest exogenous information available (for example, electricity sales and generation are simulated by using actual weather data). The historical energy data, compiled in the fourth quarter 1997 version of the Short-Term Integrated Forecasting System (STIFS) database, are mostly EIA data regularly published in the Monthly Energy Review, Petroleum Supply Monthly, and other EIA publications. Minor discrepancies between the data in these publications and the historical data in this Outlook are due to independent rounding. The STIFS model is driven principally by three sets of assumptions or inputs: estimates of key macroeconomic variables, world oil price assumptions, and assumptions about the severity of weather. 19 tabs.

  6. Short-Term Energy Outlook: Quarterly projections. Fourth quarter 1993

    Energy Technology Data Exchange (ETDEWEB)

    1993-11-05

    The Energy Information Administration (EIA) prepares quarterly, short-term energy supply, demand, and price projections for publication in February, May, August, and November in the Short-Term Energy Outlook (Outlook). An annual supplement analyzes the performance of previous forecasts, compares recent cases with those of other forecasting services, and discusses current topics related to the short-term energy markets. (See Short-Term Energy Outlook Annual Supplement, DOE/EIA-0202.) The forecast period for this issue of the Outlook extends from the fourth quarter of 1993 through the fourth quarter of 1994. Values for the third quarter of 1993, however, are preliminary EIA estimates (for example, some monthly values for petroleum supply and disposition are derived in part from weekly data reported in the Weekly Petroleum Status Report) or are calculated from model simulations using the latest exogenous information available (for example, electricity sales and generation are simulated using actual weather data). The historical energy data are EIA data published in the Monthly Energy Review, Petroleum Supply Monthly, and other EIA publications.

  7. Short-term energy outlook: Quarterly projections, Third quarter 1992

    International Nuclear Information System (INIS)

    1992-08-01

    The Energy Information Administration (EIA) prepares quarterly, short-term energy supply, demand, and price projections for publication in February, May, August, and November in the Short-Term Energy Outlook (Outlook). An annual supplement analyzes the performance of previous forecasts, compares recent cases with those of other forecasting services, and discusses current topics related to the short-term energy markets. (See Short-Term Energy Outlook Annual Supplement, DOE/EIA-0202.) The principal users of the Outlook are managers and energy analysts in private industry and government. The forecast period for this issue of the Outlook extends from the third quarter of 1992 through the fourth quarter of 1993. Values for the second quarter of 1992, however, are preliminary EIA estimates (for example, some monthly values for petroleum supply and disposition are derived in part from weekly data reported in the Weekly Petroleum Status Report) or are calculated from model simulations using the latest exogenous information available (for example, electricity sales and generation are simulated using actual weather data). The historical energy data are EIA data published in the Monthly Energy Review, Petroleum Supply Monthly, and other EIA publications. Minor discrepancies between the data in these publications and the historical data in this Outlook are due to independent rounding

  8. Hazardous materials in aquatic environments of the Mississippi River Basin. Quarterly project status report, July 1, 1993--September 30, 1993

    Energy Technology Data Exchange (ETDEWEB)

    1993-11-01

    This document is a brief progress report from each of the research and education projects that are currently funded through the ERWM contract. During third quarter 1993, approval was given by DOE for purchase of equipment. Equipment purchases were initiated and much of the equipment has been received and installed. The committees in charge of coordination of sampling and analyses associated with the collaborative research groups continued to meet and address these issues. Sampling has been done in the lower part of Devil`s Swamp and in the Devil`s Swamp Lake area. In addition, extensive sampling has been done in Bayou Trepagnier and in Bayou St. John. During this period, Tulane and Xavier Universities continued working closely with Oak Ridge National Laboratories (ORNL). The ORNL 1993 summer student internship program was completed. Plans were made for expanding the program to support 8 students next summer. Leonard Price, a Xavier University Chemistry professor and John Walz, a Tulane University Engineering professor each spent 5 weeks at ORNL. During this time these faculty worked with ORNL researchers exploring mutual interests and discussing possible future collaborations. In September, Drs. Carl Gehrs, Lee Shugart and Marshall Adams of ORNL, visited the Tulane and Xavier campuses. They presented two seminars and met with several of the investigators being supported by the ERWM contract. Tulane/Xavier project administrators participated in the Office of Technology Development`s ``New Technologies and Program Exhibition`` in the Rayburn House Office Building on September 23 and in the Hart Senate Office Building on September 27.

  9. Short-term energy outlook, quarterly projections, first quarter 1998

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-01-01

    The forecast period for this issue of the Outlook extends from the first quarter of 1998 through the fourth quarter of 1999. Values for the fourth quarter of 1997, however, are preliminary EIA estimates (for example, some monthly values for petroleum supply and disposition are derived in part from weekly data reported in EIA`s Weekly Petroleum Status Report) or are calculated from model simulations that use the latest exogenous information available (for example, electricity sales and generation are simulated by using actual weather data). The historical energy data, compiled in the first quarter 1998 version of the Short-Term Integrated Forecasting System (STIFS) database, are mostly EIA data regularly published in the Monthly Energy Review, Petroleum Supply Monthly, and other EIA publications. Minor discrepancies between the data in these publications and the historical data in this Outlook are due to independent rounding. The STIFS model is driven principally by three sets of assumptions or inputs: estimates of key macroeconomic variables, world oil price assumptions, and assumptions about the severity of weather. Macroeconomic estimates are adjusted by EIA to reflect EIA assumptions which may affect the macroeconomic outlook. By varying the assumptions, alternative cases are produced by using the STIFS model. 24 figs., 19 tabs.

  10. Short-term energy outlook. Quarterly projections, first quarter 1995

    International Nuclear Information System (INIS)

    1995-02-01

    The Energy Information Administration (EIA) prepares quarterly, short-term energy supply, demand, and price projections for publication in February, May, August, and November in the Short-Term Energy Outlook (Outlook). The forecast period for this issue of the Outlook extends from the first quarter of 1995 through the fourth quarter of 1996. Values for the fourth quarter of 1994, however, are preliminary EIA estimates or are calculated from model simulations using the latest exogenous information available (for example, electricity sales and generation are simulated using actual weather data). The historical energy data, compiled into the first quarter 1995 version of the Short-Term Integrated Forecasting System (STIFS) database, are mostly EIA data regularly published in the Monthly Energy Review, Petroleum Supply Monthly, and other EIA publications. Minor discrepancies between the data in these publications and the historical data in this Outlook are due to independent rounding. The STIFS database is archived quarterly and is available from the National Technical Information Service. The cases are produced using the Short-Term Integrated Forecasting System (STIFS). The STIFS model is driven principally by three sets of assumptions or inputs: estimates of key macroeconomic variables, world oil price assumptions, and assumptions about the severity of weather. Macroeconomic estimates are produced by DRI/McGraw-Hill but are adjusted by EIA to reflect EIA assumptions about the world price of crude oil, energy product prices, and other assumptions which may affect the macroeconomic outlook. The EIA model is available on computer tape from the National Technical Information Service

  11. Short-term energy outlook, quarterly projections, second quarter 1998

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-04-01

    The Energy Information Administration (EIA) prepares quarterly short-term energy supply, demand, and price projections. The details of these projections, as well as monthly updates, are available on the Internet at: www.eia.doe.gov/emeu/steo/pub/contents.html. The paper discusses outlook assumptions; US energy prices; world oil supply and the oil production cutback agreement of March 1998; international oil demand and supply; world oil stocks, capacity, and net trade; US oil demand and supply; US natural gas demand and supply; US coal demand and supply; US electricity demand and supply; US renewable energy demand; and US energy demand and supply sensitivities. 29 figs., 19 tabs.

  12. Hazardous materials in aquatic environments of the Mississippi River Basin. Quarterly project status report, 1 April--30 June 1994

    Energy Technology Data Exchange (ETDEWEB)

    1994-08-01

    This report contains a cluster of twenty separate project reports concerning the fate, environmental transport, and toxicity of hazardous wastes in the Mississippi River Basin. Some of topics investigated involve: biological uptake and metabolism; heavy metal immobilization; biological indicators; toxicity; and mathematical models.

  13. Subject Access Project. Third Quarterly Report.

    Science.gov (United States)

    Atherton, Pauline

    This third quarterly report for the period January to March 1977 describes the production schedule, records, and estimated costs and times in creating the Subject Access Project data base. Plans for on-line use of the data base and search strategy design are outlined. A table of specifications for preparing the data base for on-line searching is…

  14. Short-term energy outlook. Quarterly projections, 2nd quarter 1994

    Energy Technology Data Exchange (ETDEWEB)

    1994-05-01

    The Energy Information Administration (EIA) prepares quarterly, short-term energy supply, demand, and price projections for publication in February, May, August, and November in the Short-Term Energy Outlook (Outlook). An annual supplement analyzes the performance of previous forecasts, compares recent cases with those of other forecasting services, and discusses current topics related to the short-term energy markets. The forecast period for this issue of the Outlook extends from the second quarter of 1994 through the fourth quarter of 1995. Values for the first quarter of 1994, however, are preliminary EIA estimates (for example, some monthly values for petroleum supply and disposition are derived in part from weekly data reported in the Weekly Petroleum Status Report) or are calculated from model simulations using the latest exogenous information available. The historical energy data, compiled into the second quarter 1994 version of the Short-Term Integrated Forecasting System (STIFS) database, are mostly EIA data regularly published in the Monthly Energy Review, Petroleum Supply Monthly, and other EIA publications. Minor discrepancies between the data in these publications and the historical data in this Outlook are due to independent rounding. The STIFS database is archived quarterly and is available from the National Technical Information Service. The cases are produced using the STIFS. The STIFS model is driven principally by three sets of assumptions or inputs: estimates of key macroeconomic variables, world oil price assumptions, and assumptions about the severity of weather. Macroeconomic estimates are produced by DRI/McGraw-Hill but are adjusted by EIA to reflect EIA assumptions about the world price of crude oil, energy product prices, and other assumptions which may affect the macroeconomic outlook. The EIA model is available on computer tape from the National Technical Information Service.

  15. quarters

    Directory of Open Access Journals (Sweden)

    Elena Grigoryeva

    2016-10-01

    Full Text Available Are there many words combining both space and time? A quarter is one of such rare words: it means both a part of the city space and a period of the year. A regular city has parts bordered by four streets. For example, Chita is a city with an absolutely orthogonal historical center. This Utopian city was designed by Decembrists in the depth of Siberian ore-mines (120. The 130 Quarter in Irkutsk is irregular from its inception because of its triangular form. Located between two roads, the forked quarter was initially bordered by flows along the west-east axis – the main direction of the country. That is why it appreciated the gift for the 350 anniversary of its transit existence – a promenade for an unhurried flow of pedestrians. The quarter manages this flow quite well, while overcoming the difficulties of new existence and gathering myths (102. Arousing many expectations, the “Irkutsk’s Quarters” project continues the theme that was begun by the 130 Quarter and involved regeneration, revival and search for Genius Loci and the key to each single quarter (74. Beaded on the trading axis, these shabby and unfriendly quarters full of rubbish should be transformed for the good of inhabitants, guests and the small business. The triptych by Lidin, Rappaport and Nevlyutov is about happiness of urbanship and cities for people, too (58. The City Community Forum was also devoted to the urban theme (114. Going through the last quarter of the year, we hope that Irkutsk will keep to the right policy, so that in the near future the wooden downtown quarters will become its pride, and the design, construction and investment complexes will join in desire to increase the number of comfortable and lively quarters in our city. The Baikal Beam will get one more landmark: the Smart School (22 for Irkutsk’s children, including orphans, will be built in several years on the bank of Chertugeevsky Bay.

  16. Weldon Spring Site Remedial Action Project quarterly environmental data summary (QEDS) for fourth quarter 1998

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-02-01

    This report contains the Quarterly Environmental Data Summary (QEDS) for the fourth quarter of 1998 in support of the Weldon Spring Site Remedial Action Project Federal Facilities Agreement. The data, except for air monitoring data and site KPA generated data (uranium analyses) were received from the contract laboratories, verified by the Weldon Spring Site verification group, and merged into the database during the fourth quarter of 1998. KPA results for on-site total uranium analyses performed during fourth quarter 1998 are included. Air monitoring data presented are the most recent complete sets of quarterly data.

  17. Tampa electric company - IGCC project. Quarterly report, January 1, 1996--March 31, 1996

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-02-01

    This quarterly report consists of materials presented at a recent review of the project. The project is an IGCC project being conducted by Tampa Electric Company. The report describes the status of the facility construction, components, operations staff training, and discusses aspects of the project which may impact the final scheduled completion.

  18. Hazardous materials in Aquatic environments of the Mississippi River basin. Quarterly project status report, 1 January 1994--30 March 1994

    Energy Technology Data Exchange (ETDEWEB)

    Abdelghani, A.

    1994-06-01

    Projects associated with this grant for studying hazardous materials in aquatic environments of the Mississippi River Basin are reviewed and goals, progress and research results are discussed. New, one-year initiation projects are described briefly.

  19. Short-term energy outlook, October 1998. Quarterly projections, 1998 4. quarter

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-10-01

    The Energy Information Administration (EIA) prepares The Short-Term Energy Outlook (energy supply, demand, and price projections) monthly for distribution on the Internet at: www.eia.doe.gov/emeu/steo/pub/contents.html. In addition, printed versions of the report are available to subscribers in January, April, July and October. The forecast period for this issue of the Outlook extends from October 1998 through December 1999. Values for third quarter of 1998 data, however, are preliminary EIA estimates (for example, some monthly values for petroleum supply and disposition are derived in part from weekly data reported in EIA`s Weekly Petroleum Status Report) or are calculated from model simulations that use the latest exogenous information available (for example, electricity sales and generation are simulated by using actual weather data). The historical energy data, compiled in the October 1998 version of the Short-term Integrated Forecasting System (STIFS) database, are mostly EIA data regularly published in the Monthly Energy Review, Petroleum Supply Monthly, and other EIA publications. Minor discrepancies between the data in these publications and the historical data in this Outlook are due to independent rounding.

  20. Collaborative Elder Abuse Prevention Project Quarterly Report.

    Science.gov (United States)

    McDaniel, Garry L.

    The Texas Department of Human Services, in collaboration with 13 other public and private organizations, co-sponsored a statewide collaborative elder abuse prevention project, to prevent abuse of elderly and disabled adults. The goal of this project is to develop a comprehensive, long-range plan for the prevention of elder abuse, a method for…

  1. Yucca Mountain Site Characterization Project: Technical Data Catalog quarterly supplement

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-03-31

    The March 21, 1993, Department of Energy (DOE)/Nuclear Regulatory Commission (NRC) Site-Specific Procedural Agreement for Geologic Repository Site Investigation and Characterization Program requires the DOE to develop and maintain a catalog of data which will be updated and provided to the NRC at least quarterly. This catalog is to include a description of the data; the time (date), place, and method of acquisition; and where it may be examined. The Yucca Mountain Site Characterization Project (YMP) Technical Data Catalog is published and distributed in accordance with the requirements of the Site-Specific Agreement. The YMP Technical Data Catalog is a report based on reference information contained in the YMP Automated Technical Data Tracking System (ATDT). The reference information is provided by Participants for data acquired or developed in support of the YMP. The Technical Data Catalog is updated quarterly and published in the month following the end of each quarter. A complete revision to the Catalog is published at the end of each fiscal year. Supplements to the end-of-year edition are published each quarter. These supplements provide information related to new data items not included in previous quarterly updates and data items affected by changes to previously published reference information. The Technical Data Catalog, dated September 30, 1993, should be retained as the baseline document for the supplements until the end-of-year revision is published and distributed in October 1994.

  2. Yucca Mountain Site Characterization Project Technical Data Catalog (quarterly supplement)

    International Nuclear Information System (INIS)

    1993-01-01

    The June 1, 1985, Department of Energy (DOE)/Nuclear Regulatory Commission (NRC) Site-Specific Procedural Agreement for Geologic Repository Site Investigation and Characterization Program requires the DOE to develop and maintain a catalog of data which will be updated and provided to the NRC at least quarterly. This catalog is to include a description of the data; the time (date), place, and method of acquisition; and where it may be examined. The Yucca Mountain Site Characterization Project (YMP) Technical Data Catalog is published and distributed in accordance with the requirements of the Site-Specific Agreement. The YMP Technical Data Catalog is a report based on reference information contained in the YMP Automated Technical Data Tracking System (ATDT). The reference information is provided by Participants for data acquired or developed in support of the YMP. The Technical Data Catalog is updated quarterly and published in the month following the end of each quarter. A complete revision to the Catalog is published at the end of each fiscal year. Supplements to the end-of-year edition are published each quarter. These supplements provide information related to new data items not included in previous quarterly updates and data items affected by changes to previously published reference information. The Technical Data Catalog, dated December 31, 1992, should be retained as the baseline document for the supplements until the end-of-year revision is published and distributed in October 1993

  3. Yucca Mountain Site Characterization Project technical data catalog: Quarterly supplement

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-12-31

    The Department of Energy (DOE)/Nuclear Regulatory Commission (NRC) Site-Specific Procedural Agreement for Geologic Repository Site Investigation and Characterization Program requires the DOE to develop and maintain a catalog of data which will be updated and provided to the NRC at least quarterly. This catalog is to include a description of the data; the time (date), place, and method of acquisition; and where the data may be examined. The Yucca Mountain Site Characterization Project (YMP) Technical Data Catalog is published and distributed-in accordance with the requirements of the Site-Specific Agreement. The YMP Technical Data Catalog is a report based on reference information contained in the YMP Automated Technical Data Tracking System (ATDT). The reference information is provided by Participants for data acquired or developed in support of the YMP. The Technical Data Catalog is updated quarterly and distributed in the month following the end of each quarter. A complete revision to the catalog is published at the end of each fiscal year. Supplements to the end-of-year edition are published each quarter. These supplements provide information related to new data items not included in previous quarterly updates and data items affected by changes to previously published reference information. The Technical Data Catalog, dated September 30, 1994, should be retained as the baseline document for the supplements until the end-of-year revision is published and distributed in October 1995.

  4. Status of APE projects

    CERN Document Server

    Alfieri, R; Onofri, E; Bartoloni, A; Battista, C; Cabibbo, Nicola; Cosimi, M; Lonardo, A; Michelotti, A; Proietti, B; Rapuano, F; Rossetti, D; Sacco, G; Tassa, S; Torelli, M; Vicini, P; Pène, O; Errico, W; Magazzù, G; Sartori, L; Schiiano, F; Tripiccione, R; De Riso, P; Petronzio, Roberto; Destri, C; Frezzotti, R; Marchesini, G; Gensch, Ulrich; Jansen, K; Kretzschmann, A; Leich, H; Paschedag, N; Pleiter, D; Schwendicke, U; Simma, H; Sommer, Rainer; Sulanke, K; Wegner, P; Fucci, A; Martin, B; Pech, J; Panizzi, E; Petricola, A

    2001-01-01

    This talk is divided in two parts. In the first part, we will summarize the status of the APEmille project that will be completed by the end of the year. We will then devote the rest of the talk to the description of a new project for a multi-TeraFlop machine, ape NEXT. The interested reader will find a much more detailed discussion of all the items touched upon here in the full proposal of the project that will shortly appear on hep-lat. (9 refs).

  5. Los Alamos National Laboratory Environmental Restoration Project quarterly technical report, April--June 1994

    Energy Technology Data Exchange (ETDEWEB)

    1994-08-18

    This quarterly report describes the technical status of activities in the Los Alamos National Laboratory Environmental Restoration (ER) Project. Each activity is identified by an activity data sheet number, a brief title describing the activity or the technical area where the activity is located, and the name of the project leader. The Hazardous and Solid Waste Amendments (HSWA) portion of the facility operating permit requires the submission of a technical progress report on a quarterly basis. This report, submitted to fulfill the permit`s requirement, summarizes the work performed and the results of sampling and analysis in the ER Project. Suspect waste found include: Radionuclides, high explosives, metals, solvents and organics. The data provided in this report have not been validated. These data are considered ``reviewed data.``

  6. Status of CSNS project

    International Nuclear Information System (INIS)

    Zhang, J.; Fu, S.N.; Chen, H.S.

    2015-01-01

    The China Spallation Neutron Source (CSNS) accelerator is designed to accelerate proton beam pulses to 1.6 GeV at 25 Hz repetition rate, striking a solid metal target to produce spallation neutrons. The accelerator provides a beam power of 100 kW on the target in the first phase and then 500 kW in the second phase by increasing the average beam intensity 5 times while raising the linac output energy. The project construction has been formally launched in 2011 and it is planned to complete the project in March 2018. It is one of the high intensity proton accelerator projects in the world and it imposes a great challenge to Chinese accelerator community. This presentation will cover the status and challenges of the CSNS project. (author)

  7. NEPA Project quarterly progress report, April 1--June 30, 1950

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1950-12-31

    Exploration of various types of power plant cycles for nuclear propelled aircraft has been continued during this quarter. The principal current objective of the project is the development of information which will make an intelligent choice of the basic power plant cycle possible. It is still hoped that this choice can be made late in 1950. The survey studies which have been under way for several months continued during the quarter. These consist of analyses and rough preliminary layouts for various types of aircraft, using each of the several basic cycles which have been seriously considered for each of the three phases of development. Although it is still extremely premature to discuss the relative merits of the various cycles, the information so for developed discloses some cycle differences which may, if confirmed by additional work, be significant. In this respect, there have been no recent major changes in the comparative standings of the cycles.

  8. 3rd quarterly report 1976 of the Fast Breeder Project

    International Nuclear Information System (INIS)

    1976-12-01

    The report describes activities which were performed within the framework of the Fast Breeder Project at the Gesellschaft fuer Kernforschung mbH Karlsruhe (GfK) or on behalf of the GfK during the third quarter. It contains contributions on the following subjects: Fuel rod development, material studies and development, corrosion tests and coolant analyses, physical experiments, reactor theory, safety of fast breeders, instrumentation and signal processing for core monitoring, environmental impacts, sodium technology tests, thermo- and fluid-dynamic tests in gas, tests concerning gas-cooled breeders. (HR) [de

  9. Weldon Spring Site Remedial Action Project Federal Facilities Agreement: Quarterly environmental data summary for third quarter 1998

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-11-06

    In support of the Weldon Spring Site Remedial Action Project Federal Facilities Agreement, a copy of the Quarterly Environmental Data Summary (QEDS) for the third quarter of 1998 is enclosed. The data presented in this letter and attachment constitute the QEDS. The data, except for air monitoring data and site KPA generated data (uranium analyses), were received from the contract laboratories, verified by the Weldon Spring Site verification group, and merged into the database during the third quarter of 1998. Air monitoring data presented are the most recent complete sets of quarterly data. Significant data, defined as data values that have exceeded defined above normal Level 2 values, are discussed in this letter for Environmental Monitoring Plan (EMP) generated data only. Above normal Level 2 values are based, in ES and H procedures, on historical high values, DOE Derived Concentration Guides (DCGs), NPDES limits, and other guidelines. The procedures also establish actions to be taken in the event that above normal data occur.

  10. Legal Immigration and Adjustment of Status Report Fiscal Year 2017, Quarter 3

    Data.gov (United States)

    Department of Homeland Security — A quarterly report that details the number of adjustments of immigration status that occurred during the reporting period, disaggregated by type of adjustment, type...

  11. Army Hearing Program Status Report Quarter 2 Fiscal Year 2017

    Science.gov (United States)

    2017-07-01

    U.S. Army Publ ic Heal th Center Army Hearing Program Status Report Q2 FY17 Clinical Public Health and Epidemiology Directorate Army... Hearing Division General Medical: 500A July 2017 Approved for public release; distribution unlimited Army Hearing Program Status Report, Q2FY17...56               INTRODUCTION The Army Hearing Program Status Report (AHPSR) is a component of the Public Health

  12. Status of Standardization Projects

    Science.gov (United States)

    1991-06-30

    MCA GL G4 913 914 914 A GL SA 50 SS N D 8915 TOTAL- 6. DELINQUENT- 0. STATUS CODES: A- 5, G- 1. Y- 0, Z- 0 8920 0539 MIL R 35084A RICE INSTANT ENRICHED...44171GL CARROTS GLA POW GL H5 904 914 914 A N D 8940 A693 MIL N 44178GL NOODLES PARMESAN AND ROMA GL H5 904 914 914 A N D 8940 A694 MIL P 44181GL PIE...20184 COFFEE INSTANT GL B4 A 893 903 913 A GL SA 50 SS U B 8955 0062 MIL T 3527D I NOT 1 TEA INSTANT GL H5 912 921 921 A GL SA 50 SS N 8955 TOTAL- 2

  13. Status of work on superconducting quarter wave resonators at JAERI

    International Nuclear Information System (INIS)

    Takeuchi, S.

    1988-01-01

    A superconducting heavy ion linac is being proposed for the JAERI-tandem booster. For the accelerating structure of the tandem booster which ought to accelerate heavy ions of wide range of mass numbers, quarter wave resonator (QWR)s are suitable because of their wide ion-velocity acceptance. Ions of hydrogen to bismuth from the JAERI tandem can be accelerated by β = 0.1 QWRs. The excellent result of a niobium QWR at Argonne National Laboratory was a motive for the development of niobium QWRs. Further considerations on the design were required, because the Argonne's QWR did not have beam ports nor frequency tuners. As a result of considerations on these points, it has been decided to have an oval cylinder for the outer conductor. The prototype resonator has been built and tested. The fabrication techniques of explosive bonding, electron beam welding and heat treatment were found to be available in domestic companies in 1984. After obtaining niobium and niobium-clad-copper materials in 1985, the prototype resonator was built in 1985-86. Electro-polishing was done in their laboratory. Tests at 4.2 K have been repeated several times in combination of treatments of the niobium surface. The work is proceeding to the construction of a buncher and a prototype linac unit which are composed of superconducting QWRs. 4 references, 4 figures, 2 tables

  14. Status of Standardization Projects

    Science.gov (United States)

    1993-12-31

    A5 B 942 943 943 ASM SA 69 D, 8115 056; ASTM D 5118 FABRICATION OF FIBERBOARD SM AS B 941 943 943 A SM SA 69 Di- N 8115 0562 ASTM D 5168 FAB AND...DR&E(AR)759 STANDARDIZATION PROJECTS REPORT - 1ST QTR FY 1994 PREPARING ACTIVITY LISTING PA AAPAA p BPP .A- G/ASA NC AC 21 RC G CSOL- Qý yqFyýFT7RL AL...941 943 943 A SM SA 69 DH N 8115 0562 ASTM D 5168 FAB AND CLOSURE TRIPLE WALL SM AS B 941 943 943 A SM SA 69 DH N 8125 0379 V’L-B-61000 BOTTLES

  15. ARM Climate Research Facility Quarterly Ingest Status Report

    Energy Technology Data Exchange (ETDEWEB)

    Koontz, A. [DOE ARM Climate Research Facility, Washington, DC (United States); Sivaraman, C. [DOE ARM Climate Research Facility, Washington, DC (United States)

    2016-10-01

    The purpose of this report is to provide a concise status update for ingests maintained by the Atmospheric Radiation Measurement (ARM) Climate Research Facility. The report is divided into the following sections: (1) new ingests for which development has begun, (2) progress on existing ingests, (3) future ingests that have been recently approved, (4) other work that leads to an ingest, and (5) top requested ingests from the ARM Data Archive. New information is highlighted in blue text.

  16. ARM Climate Research Facility Quarterly Ingest Status Report

    Energy Technology Data Exchange (ETDEWEB)

    Koontz, A. [ARM Climate Reesearch Facility, Washington, DC (United States); Sivaraman, C. [ARM Climate Reesearch Facility, Washington, DC (United States)

    2016-07-01

    The purpose of this report is to provide a concise status update for ingests maintained by the Atmospheric Radiation Measurement (ARM) Climate Research Facility. The report is divided into the following sections: (1) new ingests for which development has begun, (2) progress on existing ingests, (3) future ingests that have been recently approved, (4) other work that leads to an ingest, and (5) top requested ingests from the ARM Data Archive. New information is highlighted in blue text.

  17. Geothermal policy project. Quarterly report, June 1-August 31, 1980

    Energy Technology Data Exchange (ETDEWEB)

    Connor, T.D.

    1980-11-01

    Efforts continued to initiate geothermal and water source heat pump study activities in newly selected project states and to carry forward policy development in existing project states. Follow-up contacts were made with several project states, and state meetings and workshops were held in nine project states. Two state-specific documents were prepared during this reporting period, for Nevada and Wyoming.

  18. Basalt waste isolation project. Quarterly report, April 1, 1981-June 30, 1981

    Energy Technology Data Exchange (ETDEWEB)

    Deju, R.A.

    1981-08-01

    This document reports progress made in the Basalt Waste Isolation Project during the third quarter of fiscal year 1981. Efforts are described for the following programs of the project work breakdown structure: systems; waste package; site; repository; regulatory and institutional; test facilities; in situ test facilities.

  19. Projects at the component development and integration facility. Quarterly technical progress report, April 1, 1994--June 30, 1994

    International Nuclear Information System (INIS)

    1994-01-01

    This quarterly technical progress report presents progress on the projects at the Component Development and Integration Facility (CDIF) during the third quarter of FY94. The CDIF is a major Department of Energy test facility in Butte, Montana, operated by MSE, Inc. Projects in progress include: Biomass Remediation Project; Heavy Metal-Contaminated Soil Project; MHD Shutdown; Mine Waste Technology Pilot Program; Plasma Projects; Resource Recovery Project; and Spray Casting Project

  20. 94-1 Research and Development Project Lead Laboratory Support. Status report, April 1, 1996--June 30, 1996

    Energy Technology Data Exchange (ETDEWEB)

    Dinehart, M. [comp.

    1996-10-01

    This document reports status and technical progress for Los Alamos 94-1 Research and Development projects concerned with the management of plutonium and plutonium contaminated materials during the third quarter of FY96.

  1. Geothermal policy project. Quarterly report, March 1-May 30, 1980

    Energy Technology Data Exchange (ETDEWEB)

    Connor, T.D.

    1980-06-01

    Efforts continued to initiate geothermal and groundwater heat pump study activities in newly selected project states and to carry forward policy development in existing project states. Minnesota and South Carolina have agreed to a groundwater heat pump study, and Maryland and Virginia have agreed to a follow-up geothermal study in 1980. Follow-up contacts were made with several other existing project states and state meetings and workshops were held in eleven project states. Two generic documents were prepared, the Geothermal Guidebook and the Guidebook to Groundwater Heat Pumps, in addition to several state-specific documents.

  2. Pinon Pine IGCC project status

    International Nuclear Information System (INIS)

    Higginbotham, E.B.; Lamarre, L.J.; Glazer, M.

    1993-01-01

    Sierra Pacific Power Company (SPPCo) intends to build the Pinon Pine Power Project, an integrated coal gasification combined cycle (IGCC) plant at its Tracy Power Station near Reno, Nevada. The plant will burn approximately 800 tons of coal per day to generate electricity in a base load application. The Pinon Project was selected by the U.S. Department of Energy (DOE) for funding under Round IV of the Clean Coal Technology Program. The project will demonstrate the use of the KRW agglomerating fluidized bed gasifer operating in the air blown mode. Hot gas cleanup consisting of particulate and sulfur removal will also be demonstrated. The Cooperative Agreement between SPPCo and the DOE was executed in August 1992. Foster Wheeler USA Corporation (FWUSA) will provide engineering and construction management services. The M.W. Kellogg Company (MWK) will provide engineering of the gasifer and hot gas cleanup systems. A discussion of project progress since the 1992 Clean Coal Technology Conference, design and economic considerations, and current project status is presented

  3. US/FRG umbrella agreement for cooperation in GCR Development. Fuel, fission products, and graphite subprogram. Quarterly status report, July 1, 1982-September 30, 1982

    International Nuclear Information System (INIS)

    Turner, R.F.

    1982-10-01

    This report describes the status of the cooperative work being performed in the Fuel, Fission Product, and Graphite Subprogram under the HTR-Implementing Agreement of the United States/Federal Republic of Germany Umbrella Agreement for Cooperation in GCR Development. The status is described relative to the commitments in the Subprogram Plan for Fuel, Fission Products, and Graphite, Revision 5, April 1982. The work described was performed during the period July 1, 1982 through September 30, 1982 in the HTGR Base Technology Program at Oak Ridge National Laboratory, the HTGR Fuel and Plant Technology Programs at General Atomic Company (GA), and the Project HTR-Brennstoffkreislauf of the Entwicklungsgemeinschaft HTR at KFA Julich, HRB Mannheim, HOBEG Hanau, and SIGRI Meitingen. The requirement for and format of this quarterly status report are specified in the HTR Implementing Agreement procedures for cooperation. Responsibility for preparation of the quarterly report alternates between GA and KFA

  4. Status of LLNL granite projects

    International Nuclear Information System (INIS)

    Ramspott, L.D.

    1980-01-01

    The status of LLNL Projects dealing with nuclear waste disposal in granitic rocks is reviewed. This review covers work done subsequent to the June 1979 Workshop on Thermomechanical Modeling for a Hardrock Waste Repository and is prepared for the July 1980 Workshop on Thermomechanical-Hydrochemical Modeling for a Hardrock Waste Repository. Topics reviewed include laboratory determination of thermal, mechanical, and transport properties of rocks at conditions simulating a deep geologic repository, and field testing at the Climax granitic stock at the USDOE Nevada Test Site

  5. Status of the DIRAC Project

    International Nuclear Information System (INIS)

    Casajus, A; Ciba, K; Fernandez, V; Graciani, R; Hamar, V; Mendez, V; Poss, S; Sapunov, M; Stagni, F; Tsaregorodtsev, A; Ubeda, M

    2012-01-01

    The DIRAC Project was initiated to provide a data processing system for the LHCb Experiment at CERN. It provides all the necessary functionality and performance to satisfy the current and projected future requirements of the LHCb Computing Model. A considerable restructuring of the DIRAC software was undertaken in order to turn it into a general purpose framework for building distributed computing systems that can be used by various user communities in High Energy Physics and other scientific application domains. The CLIC and ILC-SID detector projects started to use DIRAC for their data production system. The Belle Collaboration at KEK, Japan, has adopted the Computing Model based on the DIRAC system for its second phase starting in 2015. The CTA Collaboration uses DIRAC for the data analysis tasks. A large number of other experiments are starting to use DIRAC or are evaluating this solution for their data processing tasks. DIRAC services are included as part of the production infrastructure of the GISELA Latin America grid. Similar services are provided for the users of the France-Grilles and IBERGrid National Grid Initiatives in France and Spain respectively. The new communities using DIRAC started to provide important contributions to its functionality. Among recent additions can be mentioned the support of the Amazon EC2 computing resources as well as other Cloud management systems; a versatile File Replica Catalog with File Metadata capabilities; support for running MPI jobs in the pilot based Workload Management System. Integration with existing application Web Portals, like WS-PGRADE, is demonstrated. In this paper we will describe the current status of the DIRAC Project, recent developments of its framework and functionality as well as the status of the rapidly evolving community of the DIRAC users.

  6. UNFINISHED JOURNEY Project. Quarterly report, July 1995--September 1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-02-01

    In September, 1994, the U.S. Department of Energy (Nevada Operations Office) made a $199,708 grant (through the Mathematics, Science, and Technology Education Program), to the UNFINISHED JOURNEY Project. The Project began in April, 1994, to develop and implement an innovative model of student outreach by San Jose State University (SJSU) to underserved, underrepresented student populations of the East Side Union High School District (ESUHSD). The Project was formed by a consortium involving SJSU, ESUHSD, some 20 private sector organizations (foundations/corporations), numerous local community/professional organizations, and approximately 100 private funders. This proposal to the U.S. Department of Energy was to have the Department join this unique partnership to focus University outreach to underserved student populations to pursue careers in mathematics, science, and technology.

  7. UNFINISHED JOURNEY Project. Quarterly report, September 1994--December 1994

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-02-01

    In September, 1994, the U.S. Department of Energy (Nevada Operations Office) made a $199,708 grant (through the Mathematics, Science, and Technology Education Program), to the UNFINISHED JOURNEY Project. The Project began in April, 1994, to develop and implement an innovative model of student outreach by San Jose State University (SJSU) to underserved, underrepresented student populations of the East Side Union High School District (ESUHSD). The Project was formed by a consortium involving SJSU, ESUHSD, some 20 private sector organizations (foundations/corporations), numerous local community/professional organizations, and approximately 100 private funders. This proposal to the U.S. Department of Energy was to have the Department join this unique partnership to focus University outreach to underserved student populations to pursue careers in mathematics, science, and technology.

  8. UNFINISHED JOURNEY Project. Quarterly report, April 1995--June 1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-02-01

    In September, 1994, the U.S. Department of Energy (Nevada Operations Office) made a $199,708 grant (through the Mathematics, Science, and Technology Education Program), to the UNFINISHED JOURNEY Project. The Project began in April, 1994 to develop and implement an innovative model of student outreach by San Jose State University (SJSU) to underserved, underrepresented student populations of the East Side Union High School District (ESUHSD). The Project was formed by a consortium involving SJSU, ESUHSD, some 20 private sector organizations (foundations/corporations), numerous local community/professional organizations, and approximately 100 private funders. This proposal to the U.S. Department of Energy was to have the Department join this unique partnership to focus University outreach to underserved student populations to pursue careers in mathematics, science, and technology.

  9. National Bioenergy Center - Biochemical Platform Integration Project: Quarterly Update, Winter 2010

    Energy Technology Data Exchange (ETDEWEB)

    Schell, D.

    2011-02-01

    Winter 2011 edition of the National Bioenergy Center's Biochemical Platform Integration Project quarterly newsletter. Issue topics: 33rd Symposium on Biotechnology for Fuels and Chemicals program topic areas; results from reactive membrane extraction of inhibitors from dilute-acid pretreated corn stover; list of 2010 task publications.

  10. Aircraft Nuclear Propulsion Project Quarterly Progress Report for Period Ending December 31, 1956

    Energy Technology Data Exchange (ETDEWEB)

    NA, NA [ORNL

    1957-03-12

    This quarterly progress report of the Aircraft Nuclear Propulsion Project at ORNL records the technical progress of research on circulating-fuel reactors and other ANP research at the Laboratory. The report is divided into five major parts: 1) Aircraft Reactor Engineering, 2) Chemistry, and 3) Metallurgy, 4) Heat Transfer and Physical Properties, Radiation Damage, and Fuel Recovery and Reprocessing, and 5) Reactor Shielding.

  11. Minnesota agripower project. Quarterly report, April--June 1997

    Energy Technology Data Exchange (ETDEWEB)

    Baloun, J.

    1997-07-01

    The Minnesota Valley Alfalfa Producers (MnVAP) propose to build an alfalfa processing plant integrated with an advanced power plant system at the Granite Falls, Minnesota Industrial Park to provide 75 MW of base load electric power and a competitively priced source of value added alfalfa based products. This project will utilize air blown fluidized bed gasification technology to process alfalfa stems and another biomass to produce a hot, clean, low heating value gas that will be used in a gas turbine. Exhaust heat from the gas turbine will be used to generate steam to power a steam turbine and provide steam for the processing of the alfalfa leaf into a wide range of products including alfalfa leaf meal, a protein source for livestock. The plant will demonstrate high efficiency and environmentally compatible electric power production, as well as increased economic yield from farm operations in the region. The initial phase of the Minnesota Agripower Project (MAP) will be to perform alfalfa feedstock testing, prepare preliminary designs, and develop detailed plans with estimated costs for project implementation. The second phase of MAP will include detailed engineering, construction, and startup. Full commercial operation will start in 2001.

  12. Yucca Mountain Site Characterization Project: Technical Data Catalog (quarterly supplement), June 30, 1994

    International Nuclear Information System (INIS)

    1994-01-01

    The DOE/NRC Site-Specific Procedural Agreement for Geologic Repository Site Investigation and Characterization Program requires the DOE to develop and maintain a catalog of data which will be updated and provided to the NRC at least quarterly. This catalog is to include a description of the data; the date, place, and method of acquisition; and where it may be examined. The Yucca Mountain Site Characterization Project (YMP) Technical Data Catalog is published and distributed in accordance with the requirements of the Site-Specific Agreement. The YMP Technical Data Catalog is a report based on reference information contained in the YMP Automated Technical Data Tracking System (ATDT). The reference information is provided by Participants for data acquired or developed in support of the YMP. The Technical Data Catalog is updated quarterly and published in the month following the end of each quarter. A complete revision to the catalog is published at the end of each fiscal year. Supplements to the end-of-year edition are published each quarter. These supplements provide information related to new data items not included in previous quarterly updates and data items affected by changes to previously published reference information. The Technical Data Catalog, dated September 30, 1993, should be retained as the baseline document for the supplements until the end-of-year revision is published and distributed in October 1994

  13. Status of Standardization Projects, Quarter Ending 30 June 1992

    Science.gov (United States)

    1992-06-30

    N 8940 A724 NIL H XXX GL HAM AND CHEESE FONDUE POW GL B4 922 932 932 A GL NS 8940 A725 NIL P XXX GL POTATOES LYONNAISE POW GL 84 922 932 932 A GL N...922 932 932 A GL N 8940 A699 NIL P 44182GL NOT 2 POTATOES MASHED POW GL F2 922 932 932 A GL N 8940 A700 MJIL A XXX GL APPLE BROWN BETTY POWDER GL B4...932 A GL N 8940 A708 NIL P 44182GL NOT 1 POTATOES MASHED POW GL B5 922 932 932 A GL N 8940 A709 NIL S 44170 GL NOT 1 SPAGHETTI SAUCE GL 85 922 923 923

  14. Status of Standardization Projects, Quarter Ending 31 December 1992

    Science.gov (United States)

    1992-12-31

    A PACK 0963 MIL STD 6488 DESIGN CRIT SPL SHP CTAINS OS D2 913 933 933 A SM OS 69 N PACK 0968 MIL-H-46709 HOWITZER MED SELF PROP 155MM AT F2 914 924...CONN SPL WPN AR H5 902 903 924 G AR U SOLD A039 MIL S 50827A SOFT SOLD ELEC CONN CVN WPN AR H5 902 903 924 G AR U SOLD A040 MIL STD 1460 SOLD ELEC...AR 82 924 931 931 G AR U 1336 A634 MIL-W-50849D AM5 WHD GM HE M250 INERT PT AR 81 924 932 931 G AR U 1336 N622 MIL-R-23139B ROCKET MOTORS.SURFACE LAUNC

  15. Genomes to life project quarterly report June 2004.

    Energy Technology Data Exchange (ETDEWEB)

    Heffelfinger, Grant S.

    2005-01-01

    This SAND report provides the technical progress through June 2004 of the Sandia-led project, ''Carbon Sequestration in Synechococcus Sp.: From Molecular Machines to Hierarchical Modeling'', funded by the DOE Office of Science Genomes to Life Program. Understanding, predicting, and perhaps manipulating carbon fixation in the oceans has long been a major focus of biological oceanography and has more recently been of interest to a broader audience of scientists and policy makers. It is clear that the oceanic sinks and sources of CO{sub 2} are important terms in the global environmental response to anthropogenic atmospheric inputs of CO{sub 2} and that oceanic microorganisms play a key role in this response. However, the relationship between this global phenomenon and the biochemical mechanisms of carbon fixation in these microorganisms is poorly understood. In this project, we will investigate the carbon sequestration behavior of Synechococcus Sp., an abundant marine cyanobacteria known to be important to environmental responses to carbon dioxide levels, through experimental and computational methods. This project is a combined experimental and computational effort with emphasis on developing and applying new computational tools and methods. Our experimental effort will provide the biology and data to drive the computational efforts and include significant investment in developing new experimental methods for uncovering protein partners, characterizing protein complexes, identifying new binding domains. We will also develop and apply new data measurement and statistical methods for analyzing microarray experiments. Computational tools will be essential to our efforts to discover and characterize the function of the molecular machines of Synechococcus. To this end, molecular simulation methods will be coupled with knowledge discovery from diverse biological data sets for high-throughput discovery and characterization of protein-protein complexes

  16. WFIRST: Project Overview and Status

    Science.gov (United States)

    Kruk, Jeffrey; WFIRST Formulation Science Working Group, WFIRST Project Team

    2018-01-01

    The Wide-Field InfraRed Survey Telescope (WFIRST) will be the next Astrophysics flagship mission to follow JWST. The observatory payload consists of a Hubble-size telescope aperture with a wide-field NIR instrument and a coronagraph operating at visible wavelengths and employing state-of-the-art wavefront sensing and control. The Wide-field instrument is optimized for large area NIR imaging and spectroscopic surveys, with performance requirements driven by programs to study cosmology and exoplanet detection via gravitational microlensing. All data will be public immediately, and a substantial guest observer program will be supported.The WFIRST Project is presently in Phase A, with a transition to Phase B expected in early to mid 2018. Candidate observing programs are under detailed study in order to inform the mission design, but the actual science investigations will not be selected until much closer to launch. We will present an overview of the present mission design and expected performance, a summary of Project status, and plans for selecting the observing programs.

  17. Tampa Electric Company Polk Power Station IGCC project: Project status

    Energy Technology Data Exchange (ETDEWEB)

    McDaniel, J.E.; Carlson, M.R.; Hurd, R.; Pless, D.E.; Grant, M.D. [Tampa Electric Co., FL (United States)

    1997-12-31

    The Tampa Electric Company Polk Power Station is a nominal 250 MW (net) Integrated Gasification Combined Cycle (IGCC) power plant located to the southeast of Tampa, Florida in Polk County, Florida. This project is being partially funded under the Department of Energy`s Clean Coal Technology Program pursuant to a Round II award. The Polk Power Station uses oxygen-blown, entrained-flow IGCC technology licensed from Texaco Development Corporation to demonstrate significant reductions of SO{sub 2} and NO{sub x} emissions when compared to existing and future conventional coal-fired power plants. In addition, this project demonstrates the technical feasibility of commercial scale IGCC and Hot Gas Clean Up (HGCU) technology. The Polk Power Station achieved ``first fire`` of the gasification system on schedule in mid-July, 1996. Since that time, significant advances have occurred in the operation of the entire IGCC train. This paper addresses the operating experiences which occurred in the start-up and shakedown phase of the plant. Also, with the plant being declared in commercial operation as of September 30, 1996, the paper discusses the challenges encountered in the early phases of commercial operation. Finally, the future plans for improving the reliability and efficiency of the Unit in the first quarter of 1997 and beyond, as well as plans for future alternate fuel test burns, are detailed. The presentation features an up-to-the-minute update on actual performance parameters achieved by the Polk Power Station. These parameters include overall Unit capacity, heat rate, and availability. In addition, the current status of the start-up activities for the HGCU portion of the plant is discussed.

  18. The University of Rochester Atomic Energy Project quarterly report, April 1, 1950--June 30, 1950

    Energy Technology Data Exchange (ETDEWEB)

    Blair, H.A.

    1950-12-31

    This quarterly progress report gives an overview of the University of Rochester Atomic Energy Project for April 1, 1950 thru June 30, 1950. Sections included are entitled (1) Biological Effects of External Radiation (X-rays and gamma rays), (2) Biological Effects of External Radiation (Infra-red and ultraviolet), (3) Biological effects of radioactive materials (polonium, radon, thoron, and miscellaneous project materials), (4) Uranium, (5) Beryllium, (7) thorium, (8) fluoride, (9) zirconium, (10) special materials, (11) Isotopes, (12) Outside services, (12) Project health, (13) Health physics, (14) Special Clinical Service, and (15) Instrumentation (Spectroscopy, electron microscopy, x-ray and nuclear radiation detectors, x-ray diffraction, and electronics).

  19. ISTIMES project: status and outcomes

    Science.gov (United States)

    Cuomo, V.; Proto, M.; Soldovieri, F.

    2012-04-01

    ISTIMES is a project approved in the Seventh Framework Programme of the European Union under the Joint Call FP7-ICT-SEC-2007-1. It has a three years duration and will be completed within June 2012. According to the aims of the proposal, ISTIMES project has designed, assessed and developed a prototypical modular and scalable ICT-based system, exploiting distributed and local sensors, for non-destructive electromagnetic monitoring; the specific application field was the reliability and safety of critical transport infrastructures, even if the modularity of the ISTIMES approach has permitted to extend it successfully to other critical infrastructures as dams. The continuous and fruitful involvement of end users (as Italian Civil Protection) allowed to develop applications focused on users needs. ISTIMES couples current monitoring of infrastructures with a high situational awareness during crises management, providing updated and detailed real and near real time information about the infrastructure status to improve decision support for emergency and disasters stakeholders. The system exploits an open network architecture that can accommodate a wide range of heterogeneous sensors, static and mobile, and can be easily scaled up to allow the integration of additional sensors and interfaces with other networks. It relies on state-of-the-art electromagnetic sensors, enabling a networking of terrestrial sensors, supported by specific satellite and airborne measurements. The integration of electromagnetic technologies with new ICT information and telecommunications systems enables remotely controlled monitoring and surveillance at different temporal and spatial scales, providing indexes and images of the critical transport infrastructures. The project has exploited, assessed and improved many different non-invasive technologies based on electromagnetic sensing as: Optic Fiber Sensors, Synthetic Aperture; Radar (SAR) satellite platform; Hyperspectral Spectroscopy; Infrared

  20. Tribal Colleges Initiative project. Quarterly report, April 1--June 30, 1998

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-07-01

    The Tribal Colleges Initiative (TCI) grant is in the second year of funding from the US Department of Energy Environmental Management Program. The project period has been determined to be 7.5 months, April 1 to November 14, 1998 in order to align with the federal fiscal year. This quarterly report includes activities for the first three months (April 1--June 30, 1998) of the Year 2 funding period. The TCI Program office requested each Tribal College to write a quarterly report of activities at their respective institutions. These reported are attached. These institutions are Southwestern Indian Polytechnic Institute (SIPI), Crownpoint Institute of Technology (CIT) and the Dine` College (DC, formerly Navajo Community College).

  1. Technical data base quarterly report, April--June 1992; Yucca Mountain Site Characterization Project

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1992-09-01

    The acquisition and development of technical data are activities that provide the information base from which the Yucca mountain Site will be characterized and may P-ventually be licensed as a high-level waste repository. The Project Technical Data Base (TDB) is the repository for the regional and site-specific technical data required in intermediate and license application analyses and models. The TDB Quarterly Report provides the mechanism for identifying technical data currently available from the Project TDB. Due to the variety of scientific information generated by YMP activities, the Project TDB consists of three components, each designed to store specific types of data. The Site and Engineering Properties Data Base (SEPDB) maintains technical data best stored in a tabular format. The Geographic Nodal Information Study and Evaluation System (GENISES), which is the Geographic Information System (GIS) component of the Project TDB, maintains spatial or map-like data. The Geologic and Engineering Materials Bibliography of Chemical Species (GEMBOCHS) data base maintains thermodynamic/geochemical data needed to support geochemical reaction models involving the waste package and repository geochemical environment. Each of these data bases are addressed independently within the TDB Quarterly Report.

  2. Yucca Mountain Site Characterization Project: Technical data catalog,(quarterly supplement)

    International Nuclear Information System (INIS)

    1993-01-01

    The June 1, 1985, Department of Energy (DOE)/Nuclear Regulatory Commission (NRC) Site-Specific Procedural Agreement for Geologic Repository Site Investigation and Characterization Program requires the DOE to develop and maintain a catalog of data which will be updated and provided to the NRC at least quarterly. This catalog is to include a description of the data; the time (date), place, and method of acquisition; and where it may be examined. The Yucca Mountain Site Characterization Project (YMP) Technical Data Catalog is published and distributed in accordance with the requirements of the Site-Specific Agreement. The YMP Technical Data Catalog is a report based on reference information contained in the YMP Automated Technical Data Tracking System (ATDT). The reference information is provided by Participants for data acquired or developed in support of the YMP. The Technical Data Catalog is updated quarterly and published in the month following the end of each quarter. A complete revision to the Catalog is published at the end of each fiscal year

  3. Salt repository project: Technical progress report for the quarter 1 April--30 June 1987

    International Nuclear Information System (INIS)

    1987-01-01

    This document reports the progress being made each quarter on the development of a geologic repository in salt for the permanent disposal of high-level nuclear waste. The reporting elements are arranged by the work breakdown structure so that related studies are presented together. The studies are reported by the Office of Nuclear Waste Isolation, a prime contractor of the US Department of Energy (DOE) Salt Repository Project Office. The studies include work by other DOE prime contractors and by contractors to the Office of Nuclear Waste Isolation

  4. Salt Repository Project technical progress report for the quarter 1 January--31 March 1987

    International Nuclear Information System (INIS)

    1988-03-01

    This document reports the progress being made each quarter on the development of a geologic repository in salt for the permanent disposal of high-level nuclear waste. The reporting elements are arranged by the work breakdown structure so that related studies are presented together. The studies are reported by the Office of Nuclear Waste Isolation, a prime contractor of the US Department of energy (DOE) Salt Repository Project Office. The studies include work by other DOE prime contractors and by contractors to the Office of Nuclear Waste Isolation. 23 refs., 1 fig

  5. 94-1 Research and development project lead laboratory support. Status report, January 1--March 31, 1997

    Energy Technology Data Exchange (ETDEWEB)

    Rink, N.A. [comp.

    1997-08-01

    This status report is published for Los Alamos National Laboratory 94-1 Research and Development Project Support. The Department of Energy Office of Environmental Management funds these projects in order to support the storage or disposal of legacy plutonium and plutonium-bearing materials that resulted from weapons production throughout the DOE complex. This report summarizes status and technical progress for Los Alamos 94-1 projects during the second quarter of fiscal year 1997.

  6. 94-1 Research and development project lead laboratory support. Status report, January 1--March 31, 1997

    International Nuclear Information System (INIS)

    Rink, N.A.

    1997-08-01

    This status report is published for Los Alamos National Laboratory 94-1 Research and Development Project Support. The Department of Energy Office of Environmental Management funds these projects in order to support the storage or disposal of legacy plutonium and plutonium-bearing materials that resulted from weapons production throughout the DOE complex. This report summarizes status and technical progress for Los Alamos 94-1 projects during the second quarter of fiscal year 1997

  7. Status of the apeNEXT project

    CERN Document Server

    Ammendola, R.; Boucaud, Philippe; Cabibbo, N.; Di Carlo, F.; De Pietri, R.; Di Renzo, F.; Errico, W.; Fucci, A.; Guagnelli, M.; Kaldass, H.; Lonardo, A.; de Luca, S.; Micheli, J.; Morenas, V.; Pene, O.; Petronzio, R.; Palombi, F.; Pleiter, D.; Paschedag, N.; Rapuano, F.; De Riso, P.; Rossetti, D.; Salamon, A.; Salina, G.; Sartori, L.; Schifano, F.; Simma, H.; Tripiccione, R.; Vicini, P.; Boucaud, Ph.; 10.1016/S0920-5632(03)01755-9

    2003-01-01

    We present the current status of the apeNEXT project. Aim of this project is the development of the next generation of APE machines which will provide multi-teraflop computing power. Like previous machines, apeNEXT is based on a custom designed processor, which is specifically optimized for simulating QCD. We discuss the machine design, report on benchmarks, and give an overview on the status of the software development.

  8. Wind/photovoltaic power indicators. Third quarter 2011

    International Nuclear Information System (INIS)

    Thienard, Helene

    2011-11-01

    This document makes a quarterly status of the power generation from wind and photovoltaic power plants connected to the French grid (continental France, Corsica and overseas territories): total connected load, quarterly connected load during the last years, power generated since the beginning of the year, progress trend of wind and photovoltaic power in France, projects in progress, regional status. (J.S.)

  9. Wind/photovoltaic power indicators. Fourth quarter 2012

    International Nuclear Information System (INIS)

    Reynaud, Didier; Thienard, Helene

    2013-02-01

    This document makes a quarterly status of the power generation from wind and photovoltaic power plants connected to the French grid (continental France, Corsica and overseas territories): total connected load, quarterly distribution of new connections, progress of connected power during the last years, power generated since the beginning of the year and comparison with previous years, projects in progress, regional status. (J.S.)

  10. Wind/photovoltaic power indicators. Fourth quarter 2011

    International Nuclear Information System (INIS)

    Thienard, Helene

    2012-02-01

    This document makes a quarterly status of the power generation from wind and photovoltaic power plants connected to the French grid (continental France, Corsica and overseas territories): total connected load, quarterly connected load during the last years, power generated since the beginning of the year, progress trend of wind and photovoltaic power in France, projects in progress, regional status. (J.S.)

  11. Wind/photovoltaic power indicators. Second quarter 2012

    International Nuclear Information System (INIS)

    Thienard, Helene

    2012-09-01

    This document makes a quarterly status of the power generation from wind and photovoltaic power plants connected to the French grid (continental France, Corsica and overseas territories): total connected load, quarterly connected load during the last years, power generated since the beginning of the year, progress trend of wind and photovoltaic power in France, projects in progress, regional status. (J.S.)

  12. Wind/photovoltaic power indicators. First quarter 2013

    International Nuclear Information System (INIS)

    Reynaud, Didier; Thienard, Helene

    2013-06-01

    This document makes a quarterly status of the power generation from wind and photovoltaic power plants connected to the French grid (continental France, Corsica and overseas territories): total connected load, quarterly distribution of new connections, progress of connected power during the last years, power generated since the beginning of the year and comparison with previous years, projects in progress, regional status. (J.S.)

  13. Wind/photovoltaic power indicators. First quarter 2012

    International Nuclear Information System (INIS)

    Thienard, Helene

    2012-06-01

    This document makes a quarterly status of the power generation from wind and photovoltaic power plants connected to the French grid (continental France, Corsica and overseas territories): total connected load, quarterly connected load during the last years, power generated since the beginning of the year, progress trend of wind and photovoltaic power in France, projects in progress, regional status. (J.S.)

  14. EBT-P project status report

    International Nuclear Information System (INIS)

    1983-11-01

    This Elmo Bumpy Torus Report describes the status of the EBT-P Project in September 1983 after phasedown of the Title II design effort. The report is intended to be a principle source of guidance in the event of a decision to resume work on the project

  15. Medical Data Architecture Project Status

    Science.gov (United States)

    Krihak, M.; Middour, C.; Lindsey, A.; Marker, N.; Wolfe, S.; Winther, S.; Ronzano, K.; Bolles, D.; Toscano, W.; Shaw, T.

    2017-01-01

    The Medical Data Architecture (MDA) project supports the Exploration Medical Capability (ExMC) risk to minimize or reduce the risk of adverse health outcomes and decrements in performance due to in-flight medical capabilities on human exploration missions. To mitigate this risk, the ExMC MDA project addresses the technical limitations identified in ExMC Gap Med 07: We do not have the capability to comprehensively process medically-relevant information to support medical operations during exploration missions. This gap identifies that the current International Space Station (ISS) medical data management includes a combination of data collection and distribution methods that are minimally integrated with on-board medical devices and systems. Furthermore, there are variety of data sources and methods of data collection. For an exploration mission, the seamless management of such data will enable an increasingly autonomous crew than the current ISS paradigm. The MDA will develop capabilities that support automated data collection, and the necessary functionality and challenges in executing a self-contained medical system that approaches crew health care delivery without assistance from ground support. To attain this goal, the first year of the MDA project focused on reducing technical risk, developing documentation and instituting iterative development processes that established the basis for the first version of MDA software (or Test Bed 1). Test Bed 1 is based on a nominal operations scenario authored by the ExMC Element Scientist. This narrative was decomposed into a Concept of Operations that formed the basis for Test Bed 1 requirements. These requirements were successfully vetted through the MDA Test Bed 1 System Requirements Review, which permitted the MDA project to begin software code development and component integration. This paper highlights the MDA objectives, development processes, and accomplishments, and identifies the fiscal year 2017 milestones and

  16. Status of the CLIO project

    International Nuclear Information System (INIS)

    Miyoki, S; Uchiyama, T; Yamamoto, K

    2004-01-01

    The CLIO project involves the Cryogenic Laser Interferometer Observatory (CLIO) detector complex for gravitational wave detection and the Kamioka Laser Interferometric Strainmeter for the acquisition of geophysical data. CLIO has been constructed to demonstrate the feasibility of a future project, the Large-scale Cryogenic Gravitational wave Telescope (LCGT). It will utilize the low seismic and stable environment of the Kamioka mine as well as sapphire mirrors and suspension fibres at low temperature to reduce thermal noise. We designed CLIO to have a noise level limited by the thermal noise of sapphire mirrors and sapphire suspension fibres, which vary from 3 x 10 -19 m Hz -1/2 at 300 K to 2 x 10 -20 m Hz -1/2 at 20 K around 100 Hz. The strainmeter has already succeeded in monitoring the Earth's tidal motion with a strain sensitivity of 2 x 10 -12 . The seismic noise veto between these same-scale interferometers is expected to provide an effective means of data selection for the gravitational wave signal analysis, and the ground motion data obtained by the strainmeter will help to maintain the stable operation of CLIO

  17. Field Verification Project for Small Wind Turbines, Quarterly Report: April - June 2001; 2nd Quarter, Issue No.5

    Energy Technology Data Exchange (ETDEWEB)

    2002-04-01

    This newsletter provides a brief overview of the Field Verification Project for Small Wind Turbines conducted out of the NWTC and a description of current activities. The newsletter also contains case studies of current projects.

  18. Field Verification Project for Small Wind Turbines Quarterly Report; July-September 2001, 3rd Quarter, Issue#6

    Energy Technology Data Exchange (ETDEWEB)

    2003-04-01

    This newsletter provides a brief overview of the Field Verification Project for Small Wind Turbines conducted at the NWTC and a description of current activities. The newsletter also contains case studies of current projects.

  19. Medical Data Architecture Project Status

    Science.gov (United States)

    Krihak, M.; Middour, C.; Gurram, M.; Wolfe, S.; Marker, N.; Winther, S.; Ronzano, K.; Bolles, D.; Toscano, W.; Shaw, T.

    2018-01-01

    The Medical Data Architecture (MDA) project supports the Exploration Medical Capability (ExMC) risk to minimize or reduce the risk of adverse health outcomes and decrements in performance due to in-flight medical capabilities on human exploration missions. To mitigate this risk, the ExMC MDA project addresses the technical limitations identified in ExMC Gap Med 07: We do not have the capability to comprehensively process medically-relevant information to support medical operations during exploration missions. This gap identifies that the current in-flight medical data management includes a combination of data collection and distribution methods that are minimally integrated with on-board medical devices and systems. Furthermore, there are a variety of data sources and methods of data collection. For an exploration mission, the seamless management of such data will enable a more medically autonomous crew than the current paradigm. The medical system requirements are being developed in parallel with the exploration mission architecture and vehicle design. ExMC has recognized that in order to make informed decisions about a medical data architecture framework, current methods for medical data management must not only be understood, but an architecture must also be identified that provides the crew with actionable insight to medical conditions. This medical data architecture will provide the necessary functionality to address the challenges of executing a self-contained medical system that approaches crew health care delivery without assistance from ground support. Hence, the products supported by current prototype development will directly inform exploration medical system requirements.

  20. Geothermal direct-heat utilization assistance. Quarterly project progress report, October--December 1997

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-01-01

    This report summarizes geothermal technical assistance, R and D and technology transfer activities of the Geo-Heat Center at Oregon Institute of Technology for the first quarter of FY-98 (October--December 1997). It describes 216 contacts with parties during this period related to technical assistance with geothermal direct heat projects. Areas dealt with include requests for general information including maps and material for high school debates, and material on geothermal heat pumps, resource and well data, space heating and cooling, greenhouses, aquaculture, equipment, district heating, resorts and spas, industrial applications, electric power and snow melting. Research activities include work on model construction specifications of lineshaft submersible pumps and plate heat exchangers, a comprehensive aquaculture developer package and revisions to the Geothermal Direct Use Engineering and Design Guidebook. Outreach activities include the publication of the Quarterly Bulletin (Vol. 18, No. 4) which was devoted entirely to geothermal activities in South Dakota, dissemination of information mainly through mailings of publications, tours of local geothermal uses, geothermal library acquisition and use, participation in workshops, short courses and technical meetings by the staff, and progress monitor reports on geothermal activities.

  1. Federal assistance program. Quarterly project progress report, January 1998--March 1998

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-04-01

    This report summarizes geothermal technical assistance, R&D and technology transfer activities of the Geo-Heat Center at Oregon Institute of Technology for the second quarter of FY-98-98 (January-March, 1998). It describes 268 contacts with parties during this period related to technical assistance with geothermal direct heat projects. Areas dealt with include requests for general information including maps and material for high school debates, and material on geothermal heat pumps, resource and well data, spacing heating and cooling, greenhouses, aquaculture, equipment, district heating, resorts and spas, industrial applications, electric power and snow melting. Research activities include work on model construction specifications for line shaft submersible pumps and plate heat exchangers and a comprehensive aquaculture developer package. The revised Geothermal Direct Use Engineering and Design Guidebooks was completed, published and is available for distribution. Outreach activities include the publication of the Quarterly Bulletin (Vol. 19, No. 1) which was devoted entirely to geothermal equipment, dissemination of information mainly through mailings of publications, tours of local geothermal uses, geothermal library acquisitions and use, participation in workshops, short courses and technical meetings by the staff, and progress monitor reports on geothermal activities.

  2. BX in-situ oil-shale project. Quarterly technical progress report, June 1, 1981-August 31, 1981

    Energy Technology Data Exchange (ETDEWEB)

    Dougan, P.M.

    1981-09-20

    June 1, 1981-August 31, 1981 was the third consecutive quarter of superheated steam injection at the BX In Situ Oil Shale Project. Injection was continuous except for the period of July 14th to August 1st when the injection was suspended during the drilling of core hole BX-37. During the quarter, 99,760 barrels of water as superheated steam were injected into Project injection wells at an average well head temperature of 752/sup 0/F and an average wellhead pressure of 1312 PSIG. During the same period, 135,469 barrels of fluid were produced from the Project production wells for a produced to injected fluid ratio of 1.36 to 1.0. Net oil production during the quarter was 38 barrels.

  3. Status of the SPARC Project

    CERN Document Server

    Serafini, Luca; Alessandria, Franco; Bacci, Alberto; Bellaveglia, Marco; Bertolucci, Sergio; Biagini, Maria; Boni, Roberto; Boscolo, Ilario; Boscolo, Manuela; Broggi, Francesco; Castellano, Michele; Catani, Luciano; Chiadroni, Enrica; Cialdi, Simone; Cianchi, Alessandro; Ciocci, Franco; Clozza, Alberto; Dattoli, Giuseppe; De Martinis, Carlo; Di Pirro, Giampiero; Dipace, Antonio; Doria, Andrea; Dowell, David; Drago, Alessandro; Emma, Paul; Esposito, Adolfo; Ferrario, Massimo; Ficcadenti, L; Filippetto, Daniele; Flora, F; Fusco, Valeria; Gabrielli, E; Gallerano, Gian P; Gallo, Alessandro; Gatti, Giancarlo; Ghigo, Andrea; Giannessi, Luca; Giove, Dario; Giovenale, Emilio; Guiducci, Susanna; Incurvati, Maurizio; Levi, Decio; Ligi, Carlo; Limborg-Deprey, Cecile; Marcellini, Fabio; Maroli, Cesare; Mattioli, Mario; Mauri, Marco; Medici, G; Messina, Giovanni; Migliorati, Mauro; Mostacci, Andrea; Musumeci, Pietro; Nisoli, Mauro; Ottaviani, P L; Pagnutti, Simonetta; Palumbo, Luigi; Parisi, Giovanni; Pellegrino, Luigi; Pelliccia, Daniele; Petrarca, Massimo; Petrillo, Vittoria; Picardi, Luigi; Preger, Miro; Quattromini, Marcello; Renieri, Alberto; Ricci, Ruggero; Rome, Massimiliano; Ronci, G; Ronsivalle, Concetta; Rosenzweig, James E; Rosetti, Maurizio; Sabia, Elio; Sanelli, Claudio; Sassi, Mauro; Serio, Mario; Sgamma, Francesco; Spataro, Bruno; Stagira, Salvatore; Stecchi, Alessandro; Stella, Angelo; Tazzari, Sergio; Tazzioli, Franco; Thomas Palmer, Dennis; Torre, A; Vaccarezza, Cristina; Vescovi, Mario; Vicario, Carlo; Zucchini, Alberto; de Silvestri, Sandro

    2005-01-01

    The SPARC project has entered its installation phase at INFN-LNF: its main goal is the promotion of an R&D activity oriented to the development of a high brightness photoinjector to drive SASE-FEL experiments. The design of the 150 MeV photoinjector has been completed and the construction of its main components is in progress, as well as the design of the 12 m undulator. In this paper we will report on the installation and test of some major components, like the Ti:Sa laser system to drive the photo-cathode, the RF gun, the RF power system, as well as some test results on the RF deflector and 4th harmonic X-band cavity prototypes. Advancements in the control and beam diagnostics systems will also be reported, in particular on the emittance-meter device for beam emittance measurements in the drift space downstream the RF gun. Recent results on laser pulse shaping, obtained with two alternative techniques (DAZZLER and Liquid Crystal Mask), show the feasibility of producing 10 ps flat-top laser pulses in the...

  4. Status of LMFBR development project in Japan

    International Nuclear Information System (INIS)

    Nagane, G.; Akebi, M.; Matsuno, Y.

    1987-01-01

    Initiation of the LMFBR development project in Japan was decided by the Atomic Energy Commission of Japan in 1966. In 1967, the Power Reactor and Nuclear Fuel Development Corporation (PNC) was established to realize the project as a part of its tasks of a wide scope covering all the reseatch and development activities concerning fuel cycle. In the present paper the status of experimental fast reactor (Joyo), which is the first milestone of the LMFBR project, prototype fast reactor (Monju) and R and D activities supporting the project including that for larger LMFBRs in the future is described. (author)

  5. Grade Retention in Primary Education Is Associated with Quarter of Birth and Socioeconomic Status.

    Science.gov (United States)

    González-Betancor, Sara M; López-Puig, Alexis J

    2016-01-01

    Grade retention is still common practice in some countries though longstanding experience tells us that it is a highly criticised practice for its unclear benefits, its important costs for the educational systems and its relation with school dropout. Therefore, the aim of the present study is to analyse which variables increase the probability of being retained in primary education differentiating between being retained in second or in fourth grade, and paying special attention to the role of the socioeconomic status of the families. By knowing which analysed variables are related to grade retention, and how, we may offer some suggestions to reduce it. We use a national dataset with more observations for Spain than any other international ones, called 'Evaluación General de Diagnóstico', conducted in Spain in 2009 with the participation of 28708 students of fourth grade of primary education from 874 schools, considered to be representative for every Spanish autonomous region. This assessment focused on four competences and includes information about the learning context collected through questionnaires for students, families, school management and teachers. Estimating different multilevel random-intercept logistic regressions we obtain the following three main findings: 1) the existence of a 'quarter of birth' effect, that nearly doubles the probability of grade retention in second grade of primary -compared to the probability of grade retention in fourth grade-, for the youngest students of their same age cohort (OR = 1.93 vs. OR = 1.53, both peducation level influences more than the fathers' one -especially in second grade (OR = 0.20 vs. OR = 0.45, both p0.05)-.

  6. Belene Nuclear Power Plant project status

    International Nuclear Information System (INIS)

    Nikolov

    2008-01-01

    The status of the Belene project with the following main features is described: Reactor type - PWR, Russian Design Plant supplier - ASE, AREVA NP/Siemens Reactor thermal power - 2 x 3012 MW Electric output -2 x 1060 MW Net efficiency - 35 % Capacity factor - 90 % Design Life Time - 60 years

  7. Current status of the AUSTRON project

    International Nuclear Information System (INIS)

    Rauch, H.; Regler, M.; Lechner, R.E.; Weber, H.

    2001-01-01

    The current status of the AUSTRON spallation source project is described with reference to the need for neutrons in Europe and - due to a certain West-East imbalance of large research facilities - especially in Central Europe. A short overview about technical aspects of proton accelerator, rapid cycling synchrotron, storage ring, target and instrumentation is presented. (author)

  8. Status of the AFP Project in ATLAS

    CERN Document Server

    AUTHOR|(INSPIRE)INSPIRE-00224260; The ATLAS collaboration

    2017-01-01

    Status of the AFP project in the ATLAS experiment is given. In 2016 one arm of the AFP detector was installed and first data have been taken. In parallel with integration of the AFP subdetector into the ATLAS TDAQ nad DCS, beam tests and preparations for the installation of the 2nd arm are performed.

  9. Status Report of Projects Activities at CERN

    CERN Document Server

    Missiaen, Dominique; Dobers, Tobias; Fuchs, Jean-Frederic; Gayde, Jean-Christophe; Jones, Mark; Mainaud Durand, Helene

    2014-01-01

    Besides the Long Shut-Down 1 (LS1), some projects are still progressing at CERN. Among them, it has to be mentioned LINAC4, a future essential part of the LHC injector chain, AWAKE, a project to verify the approach of using protons to drive a strong wakefield in a plasma, ELENA, a small compact ring for cooling and decelerating antiproton and HIE-Isolde, not to forget the long term studies for CLIC and FCC. This paper describes the status of these projects from the survey and alignment point of view.

  10. The EEE Project status and perspectives

    CERN Document Server

    Antolini, R; Baldini Ferroli, R; Bencivenni, G; Blanco, F; Bressan, E; Chiavassa, A; Cifarelli, L; Cindolo, F; Coccia, E; De Pasquale, S; Di Giovanni, A; D'Incecco, M; Fabbri, F L; Garbini, M; Gustavino, C; Hatzifotiadou, D; Imponente, G; La Rocca, P; Librizzi, F; Menghetti, H; Miozzi, S; Pappalardo,G S; Piragino, G; Riggi, F; Sartorelli, G; Sbarra, C; Selvi, M; Williams, C; Zichichi, A

    2007-01-01

    The Extreme Energy Events (EEE) project plans to build and use an array of cosmic ray telescopes for muon detection, distributed over the italian territory. The use of such telescopes, based on Multigap Resistive Plate Chambers (MRPC) will allow the study of cosmic ray showers and the correlation between multiple primaries producing distant showers. The project is also intended to involve high school teams in an advanced research work. The physics items which can be addressed by such array, and the present status and perspectives of the project are here discussed.

  11. Status of the HIE-ISOLDE Project at CERN

    CERN Document Server

    Kadi, Y; Blumenfeld, Y; Bravin, E; Calatroni, S; Catherall, R; Fraser, M A; Goddard, B; Parchet, D; Siesling, E; Vandoni, G; Venturini Delsolaro, W; Voulot, D; Williams, L R

    2012-01-01

    The HIE-ISOLDE project represents a major upgrade of the ISOLDE facility with a mandate to significantly improve the quality and increase the intensity and energy of radioactive nuclear beams produced at CERN. The project will expand the experimental nuclear physics programme at ISOLDE by focusing on an upgrade of the existing REX linac with a 40 MV superconducting linac comprising thirty-two niobium-on-copper sputter-coated quarter-wave resonators housed in six cryomodules. The new linac will raise the energy of post-accelerated beams from 3 MeV/u to over 10 MeV/u. The upgrade will be staged to first deliver beam energies of 5.5 MeV/u using two high-β cryomodules placed downstream of REX, before the energy variable section of the existing linac is replaced with two low-β cryomodules and two additional high-β cryomodules are installed to attain over 10 MeV/u with full energy variability from as low as 0.45 MeV/u. An overview of the project including a status summary of the different R&D activities and ...

  12. Krsko 2 Project Preparation and Status

    International Nuclear Information System (INIS)

    Novsak, M.; Spiler, J.; Bergant, R.; Zagar, T.

    2008-01-01

    The Government of the Republic of Slovenia has adopted a document 'Resolution on National Development Projects for the period 2007 - 2023' in October 2006. Among several projects which all support sustainable development of Slovenia, an option of a new nuclear power plant was proposed. Thus, the Slovenian Government showed obvious intention and direction of Slovenian future energetic situation. The supply of electricity has been sharpening in Slovenia in the last few years. Growing of gross domestic product (GDP) and approaching to the life standard of developed EU countries has caused increased consumption of electricity. Since domestic electricity production does not follow the increased consumption, Slovenia already imports nearly a quarter of its needed electricity. Slovenia would need 400 MW of installed electrical power now for covering of its base load needs only. Based on recent electricity consumption forecasts, Slovenia will need 800 MW of new electricity generation capacities by 2015 and 1500 MW by 2025 respectively. Besides high annual growth rate and high dependence on electricity import, a problem of relatively old power generation objects and realization of new energy and climate package for Europe exists. All together dictates our options for expansion of capacity production of the proposed Nuclear power plant Krsko 2. Experience and knowledge of light water pressurized reactor can be effectively used at NPP Krsko 2. Planned NPP Krsko 2 would have between 1100 and 1600 MW of installed electrical power. If the decision is taken in 2009, construction could start in 2013 and finish in 2017. (author)

  13. Status Report Kuwait Nuclear Data Project

    Energy Technology Data Exchange (ETDEWEB)

    Farhan, A. [Kuwait Nuclear Data Center, Kuwait University, Kuwait (Kuwait)

    2013-08-15

    This report covers the Kuwaiti group's activities for the period April 2011 - January 2013. The Kuwait Group will continue its collaboration in order to fulfill its commitments. The Kuwait Nuclear Data Project has permanent responsibility for evaluating and updating ENSDF for A = 74 -80. The status of the mass chains is: - A = 74 (2006), - A = 75 (1999) {radical}, - A = 76 (1995) {radical}, - A = 77 (2012), - A = 78 (2009), - A = 79 (2002), - A = 80 (2005)

  14. GBRN/DOE Project: Dynamic enhanced recovery technologies. Quarterly technical report, January 1994--March 1994

    Energy Technology Data Exchange (ETDEWEB)

    Anderson, R.N.

    1994-04-15

    Global Basins Research Network will perform a field demonstration of their ``Dynamic Enhanced Recovery Technology`` to test the concept that the growth faults in EI-330 field are conduits through which producing reservoirs are charged and that enhanced production can be developed by producing directly from the fault zone. The site, operated by Penzoil, is located in 250 feet of water the productive depth intervals include 4000 to 9000 feet. Previous work, which incorporated pressure, temperature, fluid flow, heat flow, seismic, production, and well log data, indicated active fluid flow along fault zones. The field demonstration will be accomplished by drilling and production test of growth fault systems associated with the EI-330 field. The project utilizes advanced 3-D seismic analysis, geochemical studies, structural and stratigraphic reservoir characterization, reservoir simulation, and compact visualization systems. The quarterly progress reports contains accomplishments to date for the following tasks: Management start-up; database management; field and demonstration equipment; reservoir characterization, modeling; geochemistry; and data integration.

  15. Wind/photovoltaic power indicators. Fourth quarter 2013

    International Nuclear Information System (INIS)

    Reynaud, Didier

    2014-02-01

    This document presents a quarterly review of the power generation from wind and photovoltaic power plants connected to the French grid (continental France, Corsica and overseas territories): total connected load, quarterly distribution of new connections, progress of connected power during the last years, power generated since the beginning of the year and comparison with previous years, projects in progress, regional status

  16. Wind/photovoltaic power indicators. Third quarter 2013

    International Nuclear Information System (INIS)

    Reynaud, Didier

    2013-11-01

    This document presents a quarterly review of the power generation from wind and photovoltaic power plants connected to the French grid (continental France, Corsica and overseas territories): total connected load, quarterly distribution of new connections, progress of connected power during the last years, power generated since the beginning of the year and comparison with previous years, projects in progress, regional status

  17. Wind/photovoltaic power indicators. First quarter 2014

    International Nuclear Information System (INIS)

    Reynaud, Didier

    2014-05-01

    This document presents a quarterly review of the power generation from wind and photovoltaic power plants connected to the French grid (continental France, Corsica and overseas territories): total connected load, quarterly distribution of new connections, progress of connected power during the last years, power generated since the beginning of the year and comparison with previous years, projects in progress, regional status

  18. Status of ITER Cryodistribution and Cryoline project

    Science.gov (United States)

    Sarkar, B.; Vaghela, H.; Shah, N.; Bhattacharya, R.; Choukekar, K.; Patel, P.; Kapoor, H.; Srinivasa, M.; Chang, H. S.; Badgujar, S.; Monneret, E.

    2017-02-01

    The system of ITER Cryodistribution (CD) and Cryolines (CLs) is an integral interface between the Cryoplant systems and the superconducting (SC) magnets as well as Cryopumps (CPs). The project has progressed from the conceptual stage to the industrial stage. The subsystems are at various stages of design as defined by the project, namely, preliminary design, final design and formal reviews. Significant progresses have been made in the prototypes studies and design validations, such as the CL and cold circulators. While one of the prototype CL is already tested, the other one is in manufacturing phase. Performance test of two cold circulators have been completed. Design requirements are unique due the complexity arising from load specifications, layout constraints, regulatory compliance, operating conditions as well as several hundred interfaces. The present status of the project in terms of technical achievements, implications of the changes and the technical management as well as the risk assessment and its mitigation including path forward towards realization is described.

  19. Wolsong 2, 3, and 4 quarterly progress review report on NSSS design and engineering

    Energy Technology Data Exchange (ETDEWEB)

    Jung, Sung Hoon; Kim, Sun Kee; Park, Tae Keun [Korea Atomic Energy Research Institute, Taejon (Korea, Republic of)

    1995-01-01

    This is the Quarterly Progress Review Report for Wolsong NPP 2, 3 and 4 NSSS Design and Engineering which evaluates the performance of the project and describes the project highlight, manpower loading status, design and engineering and project related meetings by quarterly basis. 29 figs., 16 tabs. (Author).

  20. The INCA project: present status and outlook

    International Nuclear Information System (INIS)

    Aleksandrov, K.V.; Ammosov, V.V.; Chechin, V.A.; Chubenko, A.P.; Erlykin, A.D.; Ladygin, E.A.; Merzon, G.I.; Mukhamedshin, R.A.; Murashov, V.N.; Pavlyuchenko, V.P.; Ryabov, V.A.; Ryazhskaya, O.G.; Saito, T.; Sobolevskii, N.M.; Shchepetov, A.L.; Starkov, N.I.; Trostin, I.S.; Tsarev, V.A.; Wolfendale, A.; Zatsepin, G.T.; Zhdanov, G.B.; Zhukov, A.P.

    2002-01-01

    Scientific objectives, foundations, status, and outlook of the INCA Project are presented. Fundamentally new technique based on the ionization-neutron calorimeter (INCA) and designed to study local nearby sources of high-energy cosmic rays by direct measuring the spectrum and composition of the nuclear component in the 'knee' region and the spectrum of primary electrons in the energy range 0.1-10 TeV with the proton-background suppression factor up to 10 7 is discussed. Experimental data on exposition of the INCA prototypes to electron, pion, and proton beams at various energies and corresponding simulation results are presented. Prospects are considered

  1. Present status of the SRRC Project

    International Nuclear Information System (INIS)

    Chang, C.; Cheng, K.C.; Liu, Y.C.; Tseng, P.K.

    1985-01-01

    Upon the recommendation of the overseas Chinese scholars and the feasibility study group organized by the National Science Council, the government approved the establishment of the Synchrotron Radiation Research Center (SRRC) on July 9, 1983. The main goal of the SRRC project is to construct and operate an up-to-date 1 GeV synchrotron radiation source, with three beam lines for general experiments, in five to six years; to provide local scientists and returned scientists from abroad a facility to carry out frontier researches in both basic and applied science; and to elevate the technological capabilities of the related industries, universities, and research institutes through the construction of the machine. The background and present status of the project are discussed

  2. The Super-B project accelerator status

    CERN Document Server

    Biagini, M.E.; Boni, R; Boscolo, M; Demma, T; Drago, A; Esposito, M; Guiducci, S; Marcellini, F; Mazzitelli, G; Preger, M; Raimondi, P; Sanelli, C; Serio, M; Stecchi, A; Stella, A; Tomassini, S; Zobov, M; Bertsche, K; Brachmann, A; Cai, Y; Chao, A; DeLira, A; Donald, M; Fisher, A; Kharakh, D; Krasnykh, A; Li, N; MacFarlane, D; Nosochkov, Y; Novokhatski, A; Pivi, M.; Seeman, J; Sullivan, M; Wienands, U; Weisend, J; Wittmer, W; Koop, I; Levichev, E; Nikitin, S; Piminov, P; Sinyatkin, S; Shatilov, D; Bolzon, B; Brunetti, L; Jeremie, A; Baylac, M; DeConto, J M; Gomez, Y; Meot, F; Monseu, N; Tourres, D; Bonis, J.; Chehab, R; Le Meur, G; Mercier, B; Poirier, F; Prevost, C; Rimbault, C; Touze, F; Variola, A; Chance, A; Napoly, O; Bosi, F; Liuzzo, S; Paoloni, E; Bettoni, S

    2010-01-01

    The SuperB project is an international effort aiming at building in Italy a very high luminosity e+e- (1036 cm-2 sec-1) asymmetric collider at the Y(4S) energy in the cm. The accelerator design has been extensively studied and changed during the past year. The present design, based on the new collision scheme, with large Piwinski angle and the use of “crab waist” sextupoles already successfully tested at the DANE -Factory at LNF Frascati, provides larger flexibility, better dynamic aperture and spin manipulation sections in the Low Energy Ring (LER) for longitudinal polarization of the electron beam at the Interaction Point (IP). The Interaction Region (IR) has been further optimized in terms of apertures and reduced backgrounds in the detector. The injector complex design has been also updated. A summary of the project status will be presented in this paper

  3. Los Alamos National Laboratory Yucca Mountain Site Characterization Project 1993 Quality Program status report

    International Nuclear Information System (INIS)

    Boliver, S.L.

    1995-05-01

    This status report is for calendar year 1993. It summarizes the annual activities and accomplishments of the Los Alamos National Laboratory (Los Alamos) Yucca Mountain Site Characterization Project (YMP or Project) quality assurance program. By identifying the accomplishments of the quality program, we establish a baseline that will assist in decision making, improve administrative controls and predictability, and allow us to annually identify long term trends and to evaluate improvements. This is the third annual status report (Bolivar, 1992; Bolivar, 1994). This report is divided into two primary sections: Program Activities and Trend Analysis. Under Program Activities, programmatic issues occurring in 1993 are discussed. The goals for 1993 are also listed, followed by a discussion of their status. Lastly, goals for 1994 are identified. The Trend Analysis section is a summary of 1993 quarterly trend reports and provides a good overview of the quality assurance issues of the Los Alamos YMP

  4. Los Alamos National Laboratory Yucca Mountain Site Characterization Project 1993 Quality Program status report

    Energy Technology Data Exchange (ETDEWEB)

    Bolivar, S.L.

    1995-05-01

    This status report is for calendar year 1993. It summarizes the annual activities and accomplishments of the Los Alamos National Laboratory (Los Alamos) Yucca Mountain Site Characterization Project (YMP or Project) quality assurance program. By identifying the accomplishments of the quality program, we establish a baseline that will assist in decision making, improve administrative controls and predictability, and allow us to annually identify long term trends and to evaluate improvements. This is the third annual status report (Bolivar, 1992; Bolivar, 1994). This report is divided into two primary sections: Program Activities and Trend Analysis. Under Program Activities, programmatic issues occurring in 1993 are discussed. The goals for 1993 are also listed, followed by a discussion of their status. Lastly, goals for 1994 are identified. The Trend Analysis section is a summary of 1993 quarterly trend reports and provides a good overview of the quality assurance issues of the Los Alamos YMP.

  5. Next Generation Life Support Project Status

    Science.gov (United States)

    Barta, Daniel J.; Chullen, Cinda; Vega, Leticia; Cox, Marlon R.; Aitchison, Lindsay T.; Lange, Kevin E.; Pensinger, Stuart J.; Meyer, Caitlin E.; Flynn, Michael; Jackson, W. Andrew; hide

    2014-01-01

    Next Generation Life Support (NGLS) is one of over twenty technology development projects sponsored by NASA's Game Changing Development Program. The NGLS Project develops selected life support technologies needed for humans to live and work productively in space, with focus on technologies for future use in spacecraft cabin and space suit applications. Over the last three years, NGLS had five main project elements: Variable Oxygen Regulator (VOR), Rapid Cycle Amine (RCA) swing bed, High Performance (HP) Extravehicular Activity (EVA) Glove, Alternative Water Processor (AWP) and Series-Bosch Carbon Dioxide Reduction. The RCA swing bed, VOR and HP EVA Glove tasks are directed at key technology needs for the Portable Life Support System (PLSS) and pressure garment for an Advanced Extravehicular Mobility Unit (EMU). Focus is on prototyping and integrated testing in cooperation with the Advanced Exploration Systems (AES) Advanced EVA Project. The HP EVA Glove Element, new this fiscal year, includes the generation of requirements and standards to guide development and evaluation of new glove designs. The AWP and Bosch efforts focus on regenerative technologies to further close spacecraft cabin atmosphere revitalization and water recovery loops and to meet technology maturation milestones defined in NASA's Space Technology Roadmaps. These activities are aimed at increasing affordability, reliability, and vehicle self-sufficiency while decreasing mass and mission cost, supporting a capability-driven architecture for extending human presence beyond low-Earth orbit, along a human path toward Mars. This paper provides a status of current technology development activities with a brief overview of future plans.

  6. Next Generation Life Support Project Status

    Science.gov (United States)

    Barta, Daniel J.; Chullen, Cinda; Pickering, Karen D.; Cox, Marlon; Towsend, Neil; Campbell, Colin; Flynn, Michael; Wheeler, Raymond

    2012-01-01

    Next Generation Life Support (NGLS) is one of several technology development projects sponsored by NASA s Game Changing Development Program. The NGLS Project is developing life support technologies (including water recovery and space suit life support technologies) needed for humans to live and work productively in space. NGLS has three project tasks: Variable Oxygen Regulator (VOR), Rapid Cycle Amine (RCA) swing bed, and Alternative Water Processor (AWP). The RCA swing bed and VOR tasks are directed at key technology needs for the Portable Life Support System (PLSS) for an Advanced Extravehicular Mobility Unit, with focus on test article development and integrated testing in an Advanced PLSS in cooperation with the Advanced Extra Vehicular Activity (EVA) Project. An RCA swing-bed provides integrated carbon dioxide removal and humidity control that can be regenerated in real time during an EVA. The VOR technology will significantly increase the number of pressure settings available to the space suit. Current space suit pressure regulators are limited to only two settings whereas the adjustability of the advanced regulator will be nearly continuous. The AWP effort, based on natural biological processes and membrane-based secondary treatment, will result in the development of a system capable of recycling wastewater from sources expected in future exploration missions, including hygiene and laundry water. This paper will provide a status of technology development activities and future plans.

  7. Fast Breeder Project status report, 1974

    International Nuclear Information System (INIS)

    Hueper, R.

    A compilation of the papers read at the Status Report of the Fast Breeder Project at the Karlsruhe Nuclear Research Center on March 26, 1974 is presented. The first papers present a general survey of the present state of research and development work performed by the German, Belgian, and Netherlands research centers on the SNR 300 Prototype Fast Breeder Reactor (Kalkar Nuclear Power Station), on the SNR follow-on program, alternative fuels and coolants and basic problems, on work performed by industry with respect to the licensing procedure and construction of the SNR 300, and on commissioning and the planned conversion of KNK, the Compact Sodium Cooled Nuclear Reactor. The detailed papers deal with results elaborated at the institutes of GfK Karlsruhe, SCK/CEN Mol, RCN Petten, and TNO Apeldoorn. Most of these efforts have been concentrated upon fuel pin and materials development and on the physics and safety of fast reactors. The status report concludes with a reference to the future program under the Project. (U.S.)

  8. Tribal Colleges Initiative project. Quarterly report, April 1--June 30, 1998

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-07-01

    The Tribal Colleges Initiative (TCI) grant is in the second year of funding from the US Department of Energy Environmental Management program. This quarterly report includes activities for the first three months (April 1--June 30, 1998) of the Year 2 funding period. The TCI program office requested each Tribal College to write a quarterly report of activities at their respective institutions. These reports are attached. These institutions are Southwestern Indian Polytechnic Institute (SIPI), Crownpoint Institute of Technology (CIT) and the Dine` College (DC, formerly Navajo Community College). The purpose of this program is to offer educational opportunities to Native Americans in the environmental field.

  9. Status of the FRM-II project

    International Nuclear Information System (INIS)

    Boening, K.

    1994-01-01

    The new research reactor FRM-II at Garching near Munich is planned to become a high performance source of slow neutrons in Germany. Its design concept provides for a very compact reactor core cooled by light water and placed within a heavy water moderator tank, where a high thermal neutron flux will be obtained at only 20 MW power. - This paper begins with an overview over some of the essential design features and some more recent design modifications. It then reports on the status of the project, the most important event being a positive decision which the Bavarian State Government has made in January 1993 and which represented a green light for the project to enter the next project phase. Consequently, two official requests have been made by the Technical University of Munich, one for the nuclear licensing of the facility and the other for the so called 'Raumordnungsverfahren'. In this context the final version of the FRM-II safety report has been submitted to the nuclear licensing authority. (author)

  10. The LHC Project Status and Prospects

    CERN Document Server

    Faugeras, Paul E

    2001-01-01

    The Large Hadron Collider (LHC), CERN's future major facility for high-energy physics, has entered into the construction and preparation for installation phases. After recalling briefly the main machine design choices and challenges, one will review the progress of civil works for the machine and experimental areas and the status of the main LHC components, which are presently series-built and for some of them procured in kind through world-wide collaborations. Report will also be given on the full-scale prototype of an elementary LHC lattice cell, called String 2, which is being commissioned and used for optimising the installation and testing procedures of the LHC. The size and duration of the LHC Project, its intrinsic complexity and the large number of world-wide collaborations involved require rather elaborate project management tools, which will be shortly described. Finally, following the extended running of the LEP and the delay for emptying of the machine tunnel, a new planning for project completion...

  11. Current status of the IREN project

    International Nuclear Information System (INIS)

    Furman, W.I.

    1997-01-01

    A current status and a corrected time-schedule of the project of the new Intense Resonance Neutron pulsed source (IREN) realized in JINR (Dubna) for experiments dealing with fundamental and applied nuclear physics studies are discussed. This source is the upgraded variant of the existing IBR-30 pulsed booster. It consists of the 200 MeV electron linac and supplying by an electron beam the photo-neutron converter placed in the center of the very fast multiplying subcritical core. The existing buildings and beam infrastructure are planned to adopt for the new IREN source. The aim of the project is to improve essentially an energy resolution of the time-of-flight spectrometer and to increase twice (up to 10 15 n/sec) an integral neutron yield. An implementation of the IREN project has started in June 1994 with the planned end in December 1997. But due to mainly insufficient financing the approved time-schedule is shifted. Now most optimistic time of start-up of the neutron source is the end of 1999

  12. Salt repository project closeout status report

    International Nuclear Information System (INIS)

    1988-06-01

    This report provides an overview of the scope and status of the US Department of Energy (DOE's) Salt Repository Project (SRP) at the time when the project was terminated by the Nuclear Waste Policy Amendments Act of 1987. The report reviews the 10-year program of siting a geologic repository for high-level nuclear waste in rock salt formations. Its purpose is to aid persons interested in the information developed during the course of this effort. Each area is briefly described and the major items of information are noted. This report, the three salt Environmental Assessments, and the Site Characterization Plan are the suggested starting points for any search of the literature and information developed by the program participants. Prior to termination, DOE was preparing to characterize three candidate sites for the first mined geologic repository for the permanent disposal of high-level nuclear waste. The sites were in Nevada, a site in volcanic tuff; Texas, a site in bedded salt (halite); and Washington, a site in basalt. These sites, identified by the screening process described in Chapter 3, were selected from the nine potentially acceptable sites shown on Figure I-1. These sites were identified in accordance with provisions of the Nuclear Waste Policy Act of 1982. 196 refs., 21 figs., 11 tabs

  13. Aqueous homogeneous suspension reactor project. Report over the 4th quarter and the year 1974

    Energy Technology Data Exchange (ETDEWEB)

    1975-07-01

    The power of the KSTR reactor has been increased up to 200 kW in the fourth quarter of 1974. A description is given of the behaviour of the reactor at increased power level, safety aspects concerned with this new level, the operation of the reactor, instrumental behavior and mechanical behavior. Irradiation investigation of two types of fuels are reported and results are presented. Progress made on the conceptual design of a 250 MWe suspension reactor is described.

  14. ER Consolidated Quarterly Report October 2014

    Energy Technology Data Exchange (ETDEWEB)

    Cochran, John R. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2014-10-01

    This Environmental Restoration Operations (ER) Consolidated Quarterly Report (ER Quarterly Report) provides the status of ongoing corrective actions and related Long- Term Stewardship (LTS) activities being implemented by Sandia National Laboratories, New Mexico (SNL/NM) ER for the April, May, and June 2014 quarterly reporting period. Section 2.0 provides the status of ER Operations activities including closure activities for the Mixed Waste Landfill (MWL), project management and site closure, and hydrogeologic characterizations. Section 3.0 provides the status of LTS activities that relate to the Chemical Waste Landfill (CWL) and the associated Corrective Action Management Unit (CAMU). Section 4.0 provides the references noted in Section I of this report.

  15. Geothermal direct-heat utilization assistance. Quarterly project progress report, July 1996--September 1996. Federal Assistance Program

    Energy Technology Data Exchange (ETDEWEB)

    Lienau, P.

    1996-11-01

    This report summarizes geothermal technical assistance, R&D and technology transfer activities of the Geo-Heat Center at Oregon Institute of Technology for the fourth quarter of FY-96. It describes 152 contacts with parties during this period related to technical assistance with geothermal direct heat projects. Areas dealt with include geothermal heat pumps, space heating, greenhouses, aquaculture, equipment, economics and resources. Research activities are summarized on greenhouse peaking. Outreach activities include the publication of a geothermal direct use Bulletin, dissemination of information, geothermal library, technical papers and seminars, and progress monitor reports on geothermal resources and utilization.

  16. The status of US Teraflops-scale projects

    International Nuclear Information System (INIS)

    Mawhinney, R.D.

    1995-01-01

    The current status of United States projects pursuing Teraflops-scale computing resources for lattice field theory is discussed. Two projects are in existence at this time: the Multidisciplinary Teraflops Project, incorporating the physicists of the QCD Teraflops Collaboration, and a smaller project, centered at Columbia, involving the design and construction of a 0.8Teraflops computer primarily for QCD. ((orig.))

  17. Geothermal direct-heat utilization assistance. Federal Assistance Program quarterly project progress report, April 1--June 30, 1998

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-07-01

    This report summarizes geothermal technical assistance, R and D and technology transfer activities of the Geo-Heat Center at Oregon Institute of Technology for the third quarter of FY98 (April--June, 1998). It describes 231 contacts with parties during this period related to technical assistance with geothermal direct heat projects. Areas dealt with included requests for general information including material for high school and university students, and material on geothermal heat pumps, resource and well data, spacing heating and cooling, greenhouses, aquaculture, equipment, district heating, resorts and spas, industrial applications, snow melting and electric power. Research activities include work on model construction specifications for line shaft submersible pumps and plate heat exchangers, and a comprehensive aquaculture developers package. A brochure on Geothermal Energy in Klamath County was developed for state and local tourism use. Outreach activities include the publication of the Quarterly Bulletin (Vol. 19, No. 2) with articles on research at the Geo-Heat Center, sustainability of geothermal resources, injection well drilling in Boise, ID and a greenhouse project in the Azores. Other outreach activities include dissemination of information mainly through mailings of publications, tours of local geothermal uses, geothermal library acquisitions and use, participation in workshops, short courses and technical meetings by the staff, and progress monitor reports on geothermal activities.

  18. Geothermal direct-heat utilization assistance: Federal assistance program. Quarterly project progress report, October--December 1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-02-01

    The report summarizes geothermal technical assistance, R&D and technology transfer activities of the Geo-Heat Center at Oregon Institute of Technology for the first quarter of FY-96. It describes 90 contacts with parties during this period related to technical assistance with geothermal direct heat projects. Areas dealt with include geothermal heat pumps, space heating, greenhouses, aquaculture, equipment and resources. Research activities are summarized on low-temperature resource assessment, geothermal district heating system cost evaluation and silica waste utilization project. Outreach activities include the publication of a geothermal direct use Bulletin, dissemination of information, geothermal library, technical papers and seminars, development of a webpage, and progress monitor reports on geothermal resources and utilization.

  19. Current status of JMTR refurbishment project

    International Nuclear Information System (INIS)

    Kaminaga, Masanori; Niimi, Motoji; Hori, Naohiko; Takahashi, Kunihiro; Kanno, Masaru; Nakagawa, Tetsuya; Nagao, Yoshiharu; Ishihara, Masahiro; Kawamura, Hiroshi

    2010-02-01

    The JMTR is a light water moderated and cooled, beryllium reflected tank- type reactor using LUE silicide plate-type fuels. Its thermal power is 50 MW, maximum thermal and fast neutron flux is 4x10 18 m -2 s -1 . First criticality was achieved in March 1968, and its operation was stopped from August, 2006 for the refurbishment. The refurbishment is scheduled from the beginning of FY2007 to the end of FY2010. The renewed and upgraded JMTR will be re-started from FY2011. An investigation on aged components (aged-investigation) was carried out for concrete structures of the JMTR reactor building, exhaust stack, etc., and for tanks in the primary cooling system, heat exchangers, pipes in the secondary cooling system, cooling tower, emergency generators and so on, in order to identify their integrity. The aged-investigation was carried out at the beginning of FY2007. As a result, some components were decided to replace from viewpoints of future maintenance and improvement of reliability, and some components or structures were decided to repair. A visual inspection of inner side of the pressure vessel was carried out using an underwater camera in FY2008, and no serious damage was observed. Up to now, refurbishment works are in progress according to the planned schedule. In FY2009, motors of primary cooling pumps, secondary cooling pumps, motors of drain pumps, pump in the primary water transfer line to the water purification system, beryllium reflector frame, low-voltage motor control centers are to be replaced. A nuclear instrumentation system, process control system, safety protection system and so on are to be replaced in FY2010. In this paper, current status of JMTR refurbishment project is presented. (author)

  20. Wind/photovoltaic power indicators. Third quarter 2011; Tableau de bord eolien-photovoltaique - Troisieme trimestre 2011

    Energy Technology Data Exchange (ETDEWEB)

    Thienard, Helene

    2011-11-15

    This document makes a quarterly status of the power generation from wind and photovoltaic power plants connected to the French grid (continental France, Corsica and overseas territories): total connected load, quarterly connected load during the last years, power generated since the beginning of the year, progress trend of wind and photovoltaic power in France, projects in progress, regional status. (J.S.)

  1. Wind/photovoltaic power indicators. Fourth quarter 2011; Tableau de bord eolien-photovoltaique - Quatrieme trimestre 2011

    Energy Technology Data Exchange (ETDEWEB)

    Thienard, Helene

    2012-02-15

    This document makes a quarterly status of the power generation from wind and photovoltaic power plants connected to the French grid (continental France, Corsica and overseas territories): total connected load, quarterly connected load during the last years, power generated since the beginning of the year, progress trend of wind and photovoltaic power in France, projects in progress, regional status. (J.S.)

  2. Improved recovery from Gulf of Mexico reservoirs. Quarterly status report, January 1--March 31, 1996

    Energy Technology Data Exchange (ETDEWEB)

    Kimbrell, W.C.; Bassiouni, Z.A.; Bourgoyne, A.T.

    1996-04-30

    On February 18, 1992, Louisiana State University with two technical subcontractors, BDM, Inc. and ICF, Inc., began a research program to estimate the potential oil and gas reserve additions that could result from the application of advanced secondary and enhanced oil recovery technologies and the exploitation of undeveloped and attic oil zones in the Gulf of Mexico oil fields that are related to piercement salt domes. This project is a one year continuation of this research and will continue work in reservoir description, extraction processes, and technology transfer. Detailed data will be collected for two previously studies reservoirs: a South Marsh Island reservoir operated by Taylor Energy and one additional Gulf of Mexico reservoir operated by Mobil. Additional reservoirs identified during the project will also be studied if possible. Data collected will include reprocessed 2-D seismic data, newly acquired 3-D data, fluid data, fluid samples, pressure data, well test data, well logs, and core data/samples. The new data will be used to refine reservoir and geologic characterization of these reservoirs. Further laboratory investigation will provide additional simulation input data in the form of PVT properties, relative permeabilities, capillary pressure, and water compatibility. Geological investigations will be conducted to refine the models of mud-rich submarine fan architectures used by seismic analysts and reservoir engineers. Research on advanced reservoir simulation will also be conducted. This report describes a review of fine-grained submarine fans and turbidite systems.

  3. Projects at the Western Environmental Technology Office. Quarterly technical progress report, April 1--June 30, 1995

    International Nuclear Information System (INIS)

    1995-01-01

    This report contains brief outlines of the multiple projects under the responsibility of the Western Environmental Technology Office in Butte Montana. These projects include biomass remediation, remediation of contaminated soils, mine waste technology, and several other types of remediation

  4. Project Radiation protection East. Status Report, July 1997

    Energy Technology Data Exchange (ETDEWEB)

    Snihs, J.O.; Sundewall, H.; Grapengiesser, S. [STEGRA Consultants (Sweden); Bennerstedt, T. [TeknoTelje (Sweden)

    1997-12-01

    Project Radiation Protection East is a Swedish program for radiation protection work in Central and Eastern Europe. The projects are assessed, planned and performed in close cooperation with partner organizations in the East. Since 1994 radiation protection cooperation concerning the former Soviet Navy training reactors in Paldiski, Estonia, is included in the project. This report presents a summary over some 140 projects, their status, allocated funds and their distribution over countries and project areas. 12 tabs.

  5. Capital Improvement Program (CIP) Project Status

    Data.gov (United States)

    Montgomery County of Maryland — This dataset includes pertinent information relating to a capital project’s status administered by the Department of Transportation and the Department of General...

  6. Baltic NPP Project specifics and current status

    International Nuclear Information System (INIS)

    2011-01-01

    Project overview: 2 x 1194 MW Units (AES-2006 series); Location in Kaliningrad region of the; Russian Federation; Operation dates: Unit 1 – Oct 2016; Unit 2 – Apr 2018; Site preparatory works ongoing. This is first NPP project in the Russian Federation providing opportunity for participation of foreign investors. Foreign investors may acquire up to 49% share. Cross-border transmission lines developed under separate project with participation of foreign investors. Conclusion: At the selected set of assumptions, the project is financially feasible in all scenarios

  7. LLNL Underground-Coal-Gasification Project. Quarterly progress report, July-September 1981

    Energy Technology Data Exchange (ETDEWEB)

    Stephens, D.R.; Clements, W. (eds.)

    1981-11-09

    We have continued our laboratory studies of forward gasification in small blocks of coal mounted in 55-gal drums. A steam/oxygen mixture is fed into a small hole drilled longitudinally through the center of the block, the coal is ignited near the inlet and burns toward the outlet, and the product gases come off at the outlet. Various diagnostic measurements are made during the course of the burn, and afterward the coal block is split open so that the cavity can be examined. Development work continues on our mathematical model for the small coal block experiments. Preparations for the large block experiments at a coal outcrop in the Tono Basin of Washington State have required steadily increasing effort with the approach of the scheduled starting time for the experiments (Fall 1981). Also in preparation is the deep gasification experiment, Tono 1, planned for another site in the Tono Basin after the large block experiments have been completed. Wrap-up work continues on our previous gasification experiments in Wyoming. Results of the postburn core-drilling program Hoe Creek 3 are presented here. Since 1976 the Soviets have been granted four US patents on various aspects of the underground coal gasification process. These patents are described here, and techniques of special interest are noted. Finally, we include ten abstracts of pertinent LLNL reports and papers completed during the quarter.

  8. Status of Project Management Education in Pakistan

    Science.gov (United States)

    Arain, Faisal Manzoor; Tipu, Syed Awais Ahmad

    2009-01-01

    Emerging contractual delivery systems, collaborative partnerships, new management initiatives, and global product markets require professionals and students to have a broader awareness of construction methods and project management issues. This paper presents the state of the project management education in Pakistan. The analysis is based on…

  9. Quarterly Financial Report

    International Development Research Centre (IDRC) Digital Library (Canada)

    acray

    2011-06-30

    Jun 30, 2011 ... 2 IDRC QUARTERLY FINANCIAL REPORT JUNE 2011. Consolidated .... spending on capacity-building projects as well as to management's decision to restrict capacity- building ...... The investments in financial institutions.

  10. FY-1981 project status for the Transuranic Waste Treatment Facility

    International Nuclear Information System (INIS)

    Benedetti, R.L.; Tait, T.D.

    1981-11-01

    The primary objective of the Transuranic Waste Treatment Facility (TWTF) Project is to provide a facility to process low-level transuranic waste stored at the Idaho National Engineering Laboratory (INEL) into a form acceptable for disposal at the Waste Isolation Pilot Plant. This report provides brief summary descriptions of the project objectives and background, project status through FY-1981, planned activities for FY-1982, and the EG and G TWTF Project office position on processing INEL transuranic waste

  11. Projected entangled pair states: status and prospects

    Energy Technology Data Exchange (ETDEWEB)

    Verstraete, Frank [Universitaet Wien (Austria)

    2008-07-01

    We report on the progress made to extend the density matrix renormalization group to higher dimensions, discuss the underlying theory of projected entangled pair states (PEPS) and illustrate its potential on the hand of a few examples.

  12. Status report EFF and EAF projects

    International Nuclear Information System (INIS)

    Gruppelaar, H.; Kopecky, J.

    1990-08-01

    The European Fusion File (EFF) project and the associated European Activation File Project (EAF) are sponsored by the European Community's Fusion Technology Programme. The 1st programme is directed to the short-term needs of the NET team, which designs the Next European Torus, while the 2nd program is directed to long-term needs in the development of a Fusion Demonstration Reactor, in particular in connection with the study of low-activation materials. Various European laboratories participate in this project. The programme of the EFF-project is in its 2nd phase, after the successful completion of the EFF-1 data file. The emphasis on the 1st phase was on the improvement of the tritium breeding and neutron multiplication cross sections, while the 2nd phase emphasizes the improvement of a shielding data base. The progress of this 2nd phase is described. (author). 1 tab

  13. Hanford Environmental Dose Reconstruction Project, Quarterly report, September--November 1993

    International Nuclear Information System (INIS)

    Cannon, S.D.; Finch, S.M.

    1993-01-01

    The objective of the Hanford Environmental Dose Reconstruction (HEDR) Project is to estimate the radiation doses that individuals and populations could have received from nuclear operations at Hanford since 1944. The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed from release to impact on humans (dose estimates); Source Terms, Environmental Transport, Environmental Monitoring Data, Demography, Food Consumption, and Agriculture, and Environmental Pathways and Dose Estimates

  14. Defense Standardization Program Status of Standardization Projects

    Science.gov (United States)

    1993-09-30

    11352 AT Fl 902 903 903 A AT N C 25GP TOTAL - I , DELINQUENT - 1 , STATUS CODES: A - 1 , G - 0 , Y - 0 , Z - 0 2610 F158 TRA-YB TIRE & RIM ASSOCIATION...MECHANICAL SH H5 923 924 924 A SH N C3950 N047 MIL-L-29250B LOADING JACK SYSTEM ISO CON YDV 02 932 943 943 A N 3950 TOTAL - 9 ,DELINQUENT - 5 ,STATUS CODES...SECURITY LABEL DC B4 BP 931 951 951 A SC OM 90 NS N DCPS 0012 INCORPORATE SONS PROTOCOLS INTO OSI ol B4 BP 932 954 954 A SC OM 90 NS N DCPS 0012 02 ISO

  15. Integrated Data Base: Status and waste projections

    International Nuclear Information System (INIS)

    Klein, J.A.

    1990-01-01

    The Integrated Data Base (IDB) is the official US Department of Energy (DOE) data base for spent fuel and radioactive waste inventories and projections. DOE low-level waste (LLW) is just one of the many waste types that are documented with the IDB. Summary-level tables and figures are presented illustrating historical and projected volume changes of DOE LLW. This information is readily available through the annual IDB publication. Other presentation formats are also available to the DOE community through a request to the IDB Program. 4 refs., 6 figs., 5 tabs

  16. Quarterly report for the NGA FFCA project, July 1--September 30, 1994

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-12-31

    Summaries are presented of activities and meetings related to the National Governor`s Association (NGA) Federal Facilities Compliance Act (FFCA) project. The objective of this project is the management of mixed radioactive and hazardous wastes. Activities include: execution of grants to states to fund a review and development of the site treatment plans; determination of interest in a proposed cost model to be developed by EG and G; determination of the major issues that need to be addressed prior to the release of the Draft Site Treatment Plans; and development of a draft Commercial Mixed Waste Issue Paper which was distributed for review and comment.

  17. Waste Package Project quarterly report, July 1, 1995--September 30, 1995

    International Nuclear Information System (INIS)

    Ladkany, S.G.

    1995-01-01

    The following tasks are reported: overview and progress of nuclear waste package project and container design; nuclear waste container design considerations; structural investigation of multi purpose nuclear waste package canister; and design requirements of rock tunnel drift for long-term storage of high-level waste (faulted tunnel model study by photoelasticity/finite element analysis)

  18. Minnesota Agri-Power Project. Quarterly report, January--March, 1998

    Energy Technology Data Exchange (ETDEWEB)

    Wilbur, D.

    1998-05-01

    The Minnesota Valley Alfalfa Producers propose to build an alfalfa processing plant integrated with an advanced power plant system at the Granite Falls, Minnesota industrial park to provide 75 MW of base load electric power and a competitively priced source of value added alfalfa based products. This project utilizes air blown fluidized bed gasification technology to process alfalfa stems and another biomass to produce a hot, clean, low heating value gas that will be used in a gas turbine. Exhaust heat from the gas turbine will be used to generate steam to power a steam turbine and provide steam for the processing of the alfalfa leaf into a wide range of products including alfalfa leaf meal, a protein source for livestock. This progress report describes feedstock testing, feedstock supply system, performance guarantees, sales contracts, environmental permits, education, environment, economy, and project coordination and control.

  19. Status of the CP-PACS Project

    International Nuclear Information System (INIS)

    Ukawa, A.

    1995-01-01

    The CP-PACS Project, which started in April 1992, is a five-year plan to develop a massively parallel computer for carrying out research in computational physics with primary emphasis on lattice QCD. This article describes the architectural design of the CP-PACS computer, the entire computing system including the front end and mass storage, and results of benchmarks for the expected performance for lattice QCD applications. ((orig.))

  20. The CHEMVAL 2 project - status report

    International Nuclear Information System (INIS)

    Read, D.

    1993-01-01

    This paper summarizes the progress made during the first year of CHEMVAL 2, a coordinated four year research programme for evaluating and enhancing chemical models used in radiological risk assessment. Eighteen organisations from nine countries are currently participating, several of whom are also undertaking related experimental studies within the Commission of European Communities (CEC) MIRAGE Project (Migration of Radionuclides in the geosphere) - Third Phase. 16 refs., 3 figs

  1. Geothermal direct-heat utilization assistance. Quarterly project progress report, April--June 1993

    Energy Technology Data Exchange (ETDEWEB)

    Lienau, P.

    1993-06-01

    Technical assistance was provided to 60 requests from 19 states. R&D progress is reported on: evaluation of lineshaft turbine pump problems, geothermal district heating marketing strategy, and greenhouse peaking analysis. Two presentations and one tour were conducted, and three technical papers were prepared. The Geothermal Progress Monitor reported: USGS Forum on Mineral Resources, Renewable Energy Tax Credits Not Working as Congress Intended, Geothermal Industry Tells House Panel, Newberry Pilot Project, and Low-Temperature Geothermal Resources in Nevada.

  2. NGNP Project 2011 Status and Path Forward

    Energy Technology Data Exchange (ETDEWEB)

    L.E. Demick

    2011-12-01

    High Temperature Gas Reactor (HTGR) technology can play an important role in the United States’ energy future by extending the use of nuclear energy for non-electricity energy production missions as well as continuing to provide a considerable base load electric power generation capability. Extending nuclear energy into the industrial and transportation sectors through the co-production of process heat and electricity provides safe and reliable energy for these sectors in an environmentally responsible manner. The safety case for the modular HTGR provides a substantial improvement in nuclear plant safety for the protection of the public and the environment, and supports collocation of the HTGR with major industrial facilities. The NGNP Project at the Idaho National Laboratory has been working toward an objective of commercializing the HTGR technology under DOE direction since 2006. The Project is undergoing a quantum shift in direction and scope as a result of recent DOE decisions. This paper summarizes where the Project has been, where it is at the time of this writing and what is needed in future activities to commercialize HTGR technology.

  3. Western Gas Sands Project status report

    Energy Technology Data Exchange (ETDEWEB)

    Atkinson, C.H.

    1978-11-30

    Progress of government-sponsored projects directed toward increasing gas production from the low-permeability gas sands of the western United States is summarized. A Technology Implementation Plan (TIP) meeting was held at the CER office in Las Vegas, Nevada, October 16--19 to initiate the implementation phase of the Enhanced Gas Recovery (EGR) working group activities. A WGSP Logging Program meeting was conducted on October 24, 1978, at CER offices to define the problems associated with logs in tight gas sands. CER personnel and the project manager attended a two-day course on the fundamentals of core and reservoir analysis in Denver, Colorado, and met with USGS personnel to discuss USGS work on the WGSP. A meeting was held to discuss a contract for coring a Twin Arrow well on the Douglas Creek Arch, Colorado. CER Corporation personnel attended the Geological Society of America Annual Meeting held in Toronto, Canada, October 23--27 and a Gas Stimulation Workshop at Sandia Laboratories in Albuquerque, New Mexico, October 11 and 12 to discuss recent mineback experiments conducted at the Nevada Test Site. Fiscal year 1979 projects initiated by USGS and the Energy Technology Centers and National Laboratories are progressing as scheduled. Mobil Research and Development Corporation fractured zone 8 of the F-31-13G well in Rio Blanco County, Colorado. Colorado Interstate Gas Company poured the concrete pad for the compresser expected to be delivered in December and were laying pipeline between the wells at month end. The Mitchell Energy well, Muse Duke No. 1 was flowing on test at a rate of 2,100 Mcfd and preparations proceeded to fracture the well on November 15 with approximately 1,000,000 gal of fluid and 3,000,000 lb of sand. Terra Tek completed laboratory analyses of cores taken from the Mitchell Energy well.

  4. Present status of the Zavratec remediation project

    International Nuclear Information System (INIS)

    Zeleznik, N.; Stepisnik, M.; Mele, I.

    1997-01-01

    In 1992 the responsibility for the remediation of the temporary storage of radioactive waste near Zavratec was assigned to the Agency for Radwaste Management. The project was divided into two phases. First, in a study, different options for remediation were considered. In the second phase, performed in 1996, the measurements, inventorying and repacking of radioactive waste were carried out. Simultaneously with these activities a programme for covering public relations was prepared. One of the results of the public relation campaign is also a 15-minute video film, which was prepared from documentary material recorded during remedial activities, and will be presented here. (author)

  5. The MAJORANA Project: a status report

    Energy Technology Data Exchange (ETDEWEB)

    Elliott, Steven Ray [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2015-06-09

    This series of slides presents the topic under the following aspects: ββ sensitivity, underground laboratory, shield, monoliths, strings, detectors, electroformed small parts, and background. Assembly and construction are proceeding at Sanford Davis Campus laboratory. Based on assays, material backgrounds are projected to meet cleanliness goals. Module 1 is complete. Electroformed copper has just been completed at SURF and PNNL. The shield is nearly complete. Successful reduction and refinement of enrGe has taken place with 98% yield. AMTEK (ORTEC) has produced 27 kg within 32 detectors from the reduced/refined enrGe; 30 of these are underground at SURF being assembled into strings.

  6. The low energy booster project status

    International Nuclear Information System (INIS)

    Tuttle, G.W.

    1993-05-01

    In order to achieve the required injection momentum, the Superconducting Super Collider (SSC) has an accelerator chain comprised of a Linear Accelerator and three synchrotrons. The Low Energy Booster (LEB) is the first synchrotron in this chain. The LEB project has made significant progress in the development of major subsystems and conventional construction. This paper briefly reviews the performance requirements of the LEB and describes significant achievements in each of the major subsystem areas. Highlighted among these achievements are the LEB foreign collaborations with the Budker Institute of Nuclear Physics (BINP) located in Novosibirsk, Russia

  7. Status report on the NESC1 project

    Energy Technology Data Exchange (ETDEWEB)

    Hurst, R C; McGarry, D [European Commission Joint Research Centre Petten (Netherlands); Wintle, J [AEA Technology, Risley (United Kingdom); Hemsworth, B [HSE Nuclear Installations Inspectorate Bootle, Merseyside (United Kingdom)

    1997-09-01

    The Spinning Cylinder Project is the first joint international collaboration of the Network for Evaluating Steel Components (NESC) and is based around a large scale spinning cylinder test. This paper summarizes how the test conditions were defined and analysed, and how a method for detecting the moment of crack growth was developed. Now that the test has been successfully completed, the complex evaluation procedures can be commenced. The results of the test will constitute an important international benchmark for the understanding and validation of fracture methodologies used by the nuclear industry to assess reactor pressure vessels against pressurized thermal shock. (author). 13 refs, 3 figs.

  8. Status of the Multipurpose Canister (MPC) Project

    International Nuclear Information System (INIS)

    Hopper, J.P.

    1996-01-01

    The multipurpose canister (MPC) project represents a cornerstone of the current U.S. Department of Energy's Office of Civilian Radioactive Waste Management (OCRWM) program for handling spent nuclear fuel. The MPC and associated support equipment is being designed to accommodate the requirements for not only storage and transport but also for the specified disposal requirements of the mined geologic repository system. The phase 1 design effort for the MPC system, being performed by the Westinghouse team on behalf of TRW Environmental Safety Systems (TESS), the OCRWM management ampersand operating (M ampersand O) contractor, is on schedule for delivery of completed safety analysis reports (SARs) in April 1996

  9. Status of PACMAN Project at CERN

    CERN Document Server

    Catalan-Lasheras, Nuria; Modena , Michele

    2015-01-01

    Though the Large Hadron Collider (LHC) at CERN is just at the start of a program expected to run for 20 additional years, CERN is studying the next generation of colliders, like the Compact Linear Collider (CLIC). This project proposes an electron-positron collider with a length close to 50 km and with a centre of mass energy of 3 TeV at the collision point. One of the main challenges is the sub-micrometric size of the beams, down to a few nanometres at the interaction point. As a consequence, the accelerator will require unprecedented nanometric tolerances of beam alignment. A series of several thousands components will have to be assembled, aligned at the micrometre level and most critically, stabilized actively at the nanometre level. PACMAN, a study on Particle Accelerator Components Metrology and Alignment to the Nanometre scale, is a Marie Curie Program supported by the European Commission (FP7 Program), creating a network of 16 Academic and Industrial Partners. The project is hosted at CERN and it offe...

  10. Status of the NICA project at JINR

    Directory of Open Access Journals (Sweden)

    Kekelidze Vladimir

    2017-01-01

    Full Text Available The NICA (Nuclotron-based Ion Collider fAcility project is now under active realization at the Joint Institute for Nuclear Research (JINR, Dubna. The main goal of the project is a study of hot and dense strongly interacting matter in heavy-ion (up to Au collisions at the center-of-mass energies up to 11 GeV per nucleon. Two modes of operation are foreseen, collider mode and extracted beams, with two detectors: MPD and BM@N. The both experiments are in preparation stage. An average luminosity in the collider mode is expected to be 1027 cm−2 s−1 for Au (79+. Extracted beams of various nuclei with maximum momenta of 13 GeV/c (for protons will be available. A study of spin physics with extracted and colliding beams of polarized deuterons and protons at energies up to 27 GeV (for protons is foreseen with the NICA facility. The proposed program allows one to search for possible signs of phase transitions and critical phenomena as well as to shed light on the problem of the nucleon spin structure.

  11. Hanford Waste Vitrification Project overview and status

    International Nuclear Information System (INIS)

    Swenson, L.D.; Smets, J.L.

    1993-01-01

    The Hanford Waste Vitrification Project (HWVP) is being constructed at the US DOE's Hanford Site in Richland, WA. Engineering and design are being accomplished by Fluor Daniel Inc. in Irvine, CA. Technical input is furnished by Westinghouse Hanford Co. and construction management services by UE ampersand C-Catalytic Inc. The HWVP will immobilize high level nuclear waste in a glass matrix for eventual disposal in the federal repository. The HWVP consists of several structures, the major ones being the Vitrification Building, the Canister Storage Building, fan house, sand filter, waste hold tank, pump house, and administration and construction facilities. Construction started in April 1992 with the clearing and grubbing activities that prepared the site for fencing and construction preparation. Several design packages have been released for procurement activities. The most significant package release is for the Canister Storage Building, which will be the first major structure to be constructed

  12. NICA project at JINR: status and prospects

    International Nuclear Information System (INIS)

    Kekelidze, V.D.

    2017-01-01

    The project NICA (Nuclotron-based Ion Collider fAcility) is aimed to study hot and dense baryonic matter in heavy-ion collisions in the energy range up to 11.0 AGeV . The plan of NICA accelerator block development includes an upgrade of the existing superconducting (SC) synchrotron Nuclotron and construction of the new injection complex, SC Booster, and SC Collider with two interaction points (IP). The heavy-ion collision program will be performed with the fixed target experiment Baryonic Matter at Nuclotron (BM@N) at the beam extracted from the Nuclotron, and with Multi-Purpose Detector (MPD) at the first IP of NICA Collider. Investigation of nucleon spin structure and polarization phenomena is foreseen with the Spin Physics Detector (SPC) at the second IP of the Collider.

  13. Status of the NICA project at JINR

    Directory of Open Access Journals (Sweden)

    Kekelidze V.

    2016-01-01

    Full Text Available The project NICA (Nuclotron-based Ion Collider fAcility is aimed to study hot and dense baryonic matter in heavy ion collisions in the energy range up to √sNN = 11 GeV, and to study nucleon spin structure in polarized proton and deuteron collisions in the energy range up to √s = 27 GeV. The heavy ion program will be performed at the Nuclotron extracted beams with the BM@N (Baryonic Matter at Nuclotron set-up and with the MPD (MultiPurpose Detector at the NICA collider with the average luminosity of L = 1027 cm−2s−1 (for 197Au79+. The spin physics will be studied with the SPD (Spin Physics Detector at the NICA collider.

  14. Present status of the KISS project

    Science.gov (United States)

    Miyatake, H.; Wada, M.; Watanabe, X. Y.; Hirayama, Y.; Schury, P.; Ahmed, M.; Ishiyama, H.; Jeong, S. C.; Kakiguchi, Y.; Kimura, S.; Moon, J. Y.; Mukai, M.; Oyaizu, M.; Park, J. H.

    2018-04-01

    KISS project aims at finding an astrophysical condition for synthesizing r-process heavy element isotopes, which are characterized as the third peak in the solar abundance pattern. This is an experimental challenge in nuclear physics to measure ground and isomeric state properties of unknown nuclei around the region of N=126 isotones. So far we have constructed and developed new type of mass separation system, KISS (KEK Isotope Separation System) and performed measurements of lifetimes and hyperfine structures of some platinum and iridium neutron-rich radioactive isotopes by applying multi-nucleon transfer reactions and in-gas laser ionization and spectroscopy (IGLIS) methods. In this report, recent physics results, updated KISS performance, and future's research plan including a challenge of a systematic mass measurement with MRTOF (Multi-Reflection Time-Of-Flight mass spectrograph) are presented.

  15. Regional Assessment of Supplementation Project. Status report

    Energy Technology Data Exchange (ETDEWEB)

    1991-10-01

    The Fish and Wildlife Program of the Northwest Power Planning Council (NPPC) prescribes several approaches to achieve its goal of doubling the salmon and steelhead runs of the Columbia River. Among those approaches are habitat restoration, improvements in adult and juvenile passage at dams and artificial propagation. Supplementation will be a major part of the new hatchery programs. The purpose of the Regional Assessment of Supplementation Project (RASP) is to provide an overview of ongoing and planned supplementation activities, to construct a conceptual framework and model for evaluating the potential benefits and risks of supplementation and to develop a plan for better regional coordination of research and monitoring and evaluation of supplementation. RASP has completed its first year of work. Progress toward meeting the first year`s objectives and recommendations for future tasks are contained in this report.

  16. Monitored Retrievable Storage (MRS) facility project status

    International Nuclear Information System (INIS)

    Milner, R.A.; Trebules, V.W.; Blandford, J.B.

    1994-01-01

    1993 has been yet another year of major change in the Monitored Retrievable Storage (MRS) project. The change in administration has brought a new Secretary of Energy to the Department. Secretary O'Leary has brought a strong leadership background and fresh ideas to address the Department's many complex challenges, including the Civilian Radioactive Waste Management System (CRWMS). Dr. Daniel Dreyfus was named Director of the Office of Civilian Radioactive Waste Management. Mr. Richard Stallings has been named, as the new, Nuclear Waste Negotiator under the Nuclear Waste Policy Act, Amendments of 1987. The overall mission of the Office of Civilian Radioactive Waste Management (OCRWM) has not changed. OCRWM is tasked with finding technically sound, environmentally responsible and economically viable solutions to spent nuclear fuel and high-level radioactive waste storage and disposal

  17. Medical Data Architecture (MDA) Project Status

    Science.gov (United States)

    Krihak, M.; Middour, C.; Gurram, M.; Wolfe, S.; Marker, N.; Winther, S.; Ronzano, K.; Bolles, D.; Toscano, W.; Shaw, T.

    2018-01-01

    The Medical Data Architecture (MDA) project supports the Exploration Medical Capability (ExMC) risk to minimize or reduce the risk of adverse health outcomes and decrements in performance due to in-flight medical capabilities on human exploration missions. To mitigate this risk, the ExMC MDA project addresses the technical limitations identified in ExMC Gap Med 07: We do not have the capability to comprehensively process medically-relevant information to support medical operations during exploration missions. This gap identifies that the current in-flight medical data management includes a combination of data collection and distribution methods that are minimally integrated with on-board medical devices and systems. Furthermore, there are a variety of data sources and methods of data collection. For an exploration mission, the seamless management of such data will enable a more medically autonomous crew than the current paradigm. The medical system requirements are being developed in parallel with the exploration mission architecture and vehicle design. ExMC has recognized that in order to make informed decisions about a medical data architecture framework, current methods for medical data management must not only be understood, but an architecture must also be identified that provides the crew with actionable insight to medical conditions. This medical data architecture will provide the necessary functionality to address the challenges of executing a self-contained medical system that approaches crew health care delivery without assistance from ground support. Hence, the products supported by current prototype development will directly inform exploration medical system requirements.

  18. Status of the JEF and EFF projects

    International Nuclear Information System (INIS)

    Nordborg, C.; Gruppelaar, H.

    1991-05-01

    Following positive experiences gained with the 1st version of JEF (Joint Evaluated File) library, which was distributed to NEA Data Bank member countries in 1985, a significantly improved version, JEF-2.0 (in ENDF-6 format), was distributed for testing end February 1990. It is planned to compile, middle 1991, following intensive benchmark testing, a version of JEF-2 library for general use. EFF (European Fusion File) and associated EAF (European Activation File) projects are sponsored by the European Community's Fusion Technology Programme. The programme of EFF is in its 2nd phase, after the successful completion of the EFF-1 data file. This phase has been defined 1989-1991 and the emphasis is on improvement of a shielding data base. The EFF-2 library will be ready end 1991 and contain new evaluations for most of the important fusion reactor materials. A follow-up programme, including benchmark testing has been defined. Creation of a joint JEF-EFF data file has been agreed It will be compiled during 1992. (author). 20 refs.; 2 figs.; 1 tab

  19. Status of the Cracow electrostatic accelerator project

    International Nuclear Information System (INIS)

    Hebenstreit, J.R.; Kopczynski, J.P.

    1981-01-01

    The range of nuclear reaction measurements and applied interdisciplinary research performed earlier with accelerated particles in this Institute were strongly limited the accelerators being at disposal: an open air 1 MV Van de Graaff generator in the Jagellonian University and the cyclotron U-120 in the neighboring Institute of Nuclear Physics. Due to financial problems connected with buying a new ready accelerator, an approval was obtained for carrying out a detailed design study on condition that the accelerator should be constructed in the Institute and should be built of construction elements accessible in Poland. Having obtained the final approval of the project - tandem accelerator with 5 MV pressurized Van de Graaff generator, the construction was started in 1980. The investment period should be finished in 1982 with a single ended 5 MV accelerator. Simultaneously, the calculations and preparation for a tandem mode was begun. The gas handling system has just been made by the home industry and should be mounted and tested in 1981. The reconstruction of the building should be performed in the same time

  20. Status of the SLAC Linear Collider Project

    International Nuclear Information System (INIS)

    Stiening, R.

    1983-01-01

    The SLAC Linear Collider Project has two principal goals. The first is to serve as a prototype for a future very high energy linear electron-positron collider. The second is to quickly, at low cost, achieve sufficient luminosity at 100 GeV center-of-mass energy to explore the physics of the Z 0 . The first goal is important to the future of electron-positron physics because the rapid increase of synchrotron radiation with energy causes the cost of circular storage ring colliders to whereas the cost of linear colliders increases only in proportion to the center-of-mass energy. The second is important because the existance at SLAC of a linear accelerator which can be converted at low cost to collider operation makes possible a unique opportunity to quickly achieve 100 GeV center-of-mass collisions. At the design luminosity of 6.0 x 10 30 many thousands of Z 0 decays should be observed in each day of operation

  1. Status of Kijang Resarch Reactor Project

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Jee. Y; Kwon, T. H.; Kim, Jun. Y.; Oh, G. B. [KAERI, Daejeon (Korea, Republic of)

    2016-05-15

    The High-flux Advanced Neutron Application Reactor (HANARO) is a multi-purpose reactor in Korea Atomic Energy Research Institute (KAERI) and is being utilized for neutron scattering experiments, material and fuel tests for nuclear power plants, radio-isotope (RI) productions, silicon doping, neutron activation analysis, and neutron radiography. In medical applications, the majority of RIs produced using HANARO are I-131 and Ir-192. Other RIs such as Mo-99 are coming from imports. The self-sufficiency of RI demand becomes an important issue for the public health service in Korea. In this regard the Kijang Research Reactor (KJRR) project was officially launched on the first of April 2012 in need to provide the self-sufficiency of RI demand including Mo-99, increase the neutron transportation doping (NTD) capacity and develop technologies related to the research reactor. When CP is granted, the first excavation is planned to start at the end of this year. In next year, pouring the first concrete and energizing 154kV will follow. In 2018, it is planned to complete utility building construction and reactor building construction.

  2. MHD Integrated Topping Cycle Project. Thirteenth quarterly technical progress report, August 1, 1990--October 31, 1990

    Energy Technology Data Exchange (ETDEWEB)

    1992-01-01

    The overall objective of the project is to design and construct prototypical hardware for an integrated MHD topping cycle, and conduct long duration proof-of-concept tests of integrated system at the US DOE Component Development and Integration Facility in Butte, Montana. The results of the long duration tests will augment the existing engineering design data base on MHD power train reliability, availability, maintainability, and performance, and will serve as a basis for scaling up the topping cycle design to the next level of development, an early commercial scale power plant retrofit. The components of the MHD power train to be designed, fabricated, and tested include: A slagging coal combustor with a rated capacity of 50 MW thermal input, capable of operation with an Eastern (Illinois {number_sign}6) or Western (Montana Rosebud) coal, a segmented supersonic nozzle, a supersonic MHD channel capable of generating at least 1.5 MW of electrical power, a segmented supersonic diffuser section to interface the channel with existing facility quench and exhaust systems, a complete set of current control circuits for local diagonal current control along the channel, and a set of current consolidation circuits to interface the channel with the existing facility inverter.

  3. Status of the beryllium replacement project

    Energy Technology Data Exchange (ETDEWEB)

    Dimayuga, I. [Atomic Energy of Canada, Chalk River, Ontario (Canada); Corcoran, E. [Royal Military College of Canada, Kingston, Ontario (Canada); Daniels, T. [Ontario Power Generation, Pickering, Ontario (Canada); Harmsen, J. [Cameco Fuel Manufacturing Inc., Port Hope, Ontario (Canada); Lu, E. [Bruce Power, Tiverton, Ontario (Canada); Onderwater, T.; Palleck, S. [General Electric- Hitachi, Wilmington, North Carolina (United States); Pant, A. [Cameco Fuel Manufacturing Inc., Port Hope, Ontario (Canada)

    2013-07-01

    mechanical properties of the joint; corrosion resistance tests; and high-temperature exposure tests (to air or steam). At the conclusion of the out-reactor tests, results will be reviewed to determine the top two candidate materials that will advance to the in-reactor, irradiation test. The paper will present the status of out-reactor testing, including results of both the constructability assessment and mechanical property testing.

  4. Heavy-Ion Fusion System Assessment Project quarterly status report, January-March 1985

    International Nuclear Information System (INIS)

    Lee, E.P.; Hovingh, J.; Faltens, A.

    1985-06-01

    A computer model of an accelerator system is a necessary ingredient in estimating the cost of construction and operation of an ion-driven ICF power plant. The LBL computer program LIACEP (Linear Induction Accelerator Cost Evaluation Program) is used to estimate the cost and efficiency of a heavy ion induction linear accelerator as a function of the ion mass, charge and energy for a specified beam output energy, power and pulse repetition frequency. In addition to estimating the accelerator system cost and efficiency, LIACEP can be used to identify the components and materials that have a high leverage on the cost and efficiency of the accelerator system. These high leverage items are logical areas for research and technology development to reduce the cost and increase the efficiency of the accelerator system

  5. The status of BNFL's MOX project

    International Nuclear Information System (INIS)

    Edwars, John; Cooch, Julian P.; Slater, Michel W.

    2002-01-01

    Full text: In the late 1980s BNFL decided to enter the MOX fuel fabrication business to support our reprocessing business and return the plutonium product to our customers in the useable form of MOX fuel. The first phase of the strategy was to gain some irradiation experience for MOX produced by our own Short Binderless Route (SBR) process. To achieve this the MOX Demonstration Facility (MDF) was built at Sellafield and 28 MOX fuel assemblies were produced up to 1998 that were loaded into PWRs in Europe. In 1994, BNFL started the construction of their large scale MOX production plant, SMP. The design and construction of the plant and supporting facilities was completed some years ago and the commissioning of the plant with uranium commenced around June 1999. In October 2001, the UK Government provided BNFL with the approval to operate SMP with plutonium. On 20 December 2001, the UK Regulators gave BNFL their approval to start plutonium operations. This paper summarises the approach used to commission SMP and describes some of the lessons learnt during the commissioning phase of the project and the start up of the plant with plutonium. An explanation of our experience obtaining a licence to operate the plant is provided together with a description of the changes we have made to ensure that the quality of the product from SMP can be guaranteed. Finally, the paper summarises the experience BNFL has gained during irradiating MOX fuel produced by the SBR process and explains how the data compares with that available for UO2 and supports the in reactor use of MOX fuel made in SMP. (author)

  6. IGCC demonstration project status combustion engineering IGCC repowering project

    International Nuclear Information System (INIS)

    Glamuzina, R.W.; Allen, R.J.; Peletz, L.J.

    1993-01-01

    This demonstration project was originally conceived as the repowering of an existing plant facility, the Lakeside Station in Springfield, Illinois. The Owner, City Water, Light and Power (CWL ampersand P), has removed five of the original boilers and three of the original turbines. The buildings have had asbestos insulation removed and the interiors have been prepared for the construction of a single Integrated Gasification Combined Cycle (IGCC) process train that will generate a net output of 60 megawatts. The plant consists of a combined cycle (gas turbine, heat recovery steam generator, steam turbine) power train located in the existing buildings and a coal gasification system in a new building. The gasification system contains ABB CE's air-blown, entrained flow, two stage gasifier, an advanced hot gas desulfurization system by General Electric Environmental Services, Inc. and the necessary auxiliary systems. The plant is designed to produce a nominal 60 MW net output with an ambient air temperature of 95 degrees F and a cooling water temperature of 89 degrees F on either Natural Gas or Illinois No. 5 coal

  7. National synchrotron light source basic design and project status

    International Nuclear Information System (INIS)

    van Steenbergen, A.

    1981-01-01

    A summary description and the basic design parameters of the National Synchrotron Light Source, a facility for the generation of intense synchrotron radiation in the vuv and x-ray range is presented, the parameters of the sources are given, the presently planned facility beam lines are tabulated and the status of the project is indicated

  8. Status of the National Synchrotron Light Source project

    International Nuclear Information System (INIS)

    Heese, R.N.

    1981-01-01

    The National Synchrotron Light Source is in its final stages of construction, and as the turn-on time for the 700 MeV vuv storage ring draws near, an overview of the project is presented. Emphasis is placed on the linac and booster synchrotron performance and the status of major subsystems

  9. Status of the JET project and its supporting technological programme

    International Nuclear Information System (INIS)

    Bertolini, E.

    1976-01-01

    A brief review of the overall design of the JET facility is given. Particular JET components described include the vacuum system, toroidal field coils, poloidal system, power supplies, control and data acquisition, and status of the project towards the construction phase

  10. Croatian repository construction project - present status and main obstacles

    International Nuclear Information System (INIS)

    Kucar Dragicevic, S.; Subasic, D.; Schaller, A.; Lokner, V.; Cerskov Klika, M.

    1999-01-01

    Croatia has been preparing backgrounds for the construction of the repository for low and intermediate radioactive waste on its territory, almost for a decade, now. In the name of Hrvtaska elektroprivreda, the co-owner of the NE Krsko, APO has been co-ordinating and organising numerous activities and projects during that time period. Siting process, safety assessment, disposal technology and repository design and public acceptance issues are the main fields of activities. The overall status of the project at the moment, including the overview of the present status of the main four aspects of activities, will be presented. Relatively, big and important progress made on the project work out during the last two years, as well as the main obstacles we were faced with during that time period, will be discussed.(author)

  11. Status report : Terra Nova project environmental assessment panel : recommendations

    International Nuclear Information System (INIS)

    2002-01-01

    An application to the Canada-Newfoundland Offshore Petroleum Board (CNOPB) was submitted by Petro-Canada on August 5, 1996, notifying of its intent to develop the petroleum resources located at the Terra Nova field. The provincial and federal governments jointly appointed the Terra Nova Project Environmental Panel, and the board of the CNOPB referred to it the application documents for review. The environmental effects, considerations of human safety incorporated into the design and operation of the Project, the general approach to the development and exploitation of the petroleum resources, and the employment and industrial benefits expected to be derived from the Project were the issues under review by the Panel. On April 22, 1997, public hearings into the review began, and the final report was submitted to governments and the Board in August 1997. The report included 75 recommendations. The Project was approved in Decision 97.02 in December 1997, and the Board dealt with each of the recommendations. The respective positions of the Governments of Canada and Newfoundland and Labrador with regard to the recommendations that fell outside the jurisdiction of the Board were made public. A status report on every one of the 75 recommendations is provided in the present report. The recommendation is repeated, the verbatim response taken from Decision 97.02 included, followed by the status of the response. The production operations phase of the Project accounts for approximately 65 per cent of the recommendations. January 20, 2002 was the date the Project was begun

  12. The technical status of the supersara project at its termination

    International Nuclear Information System (INIS)

    Markovina, A.; Randles, J.

    1987-01-01

    On March 10th 1983 the Council of Ministers of the European Community adopted the decision to abandon the SuperSARA project. In the frame of this decision, the Management of the SuperSARA project formulated the guidelines to close the project, which included the preparation of the present final report. This report presents the final status of the project, which means that it reflects the situation in March 1983, with a few updates introduced shortly afterwards in conformity with the safety requirements which were being revised at that time. The aim of this report is to give a general description of activities which were carried on to implement the experimental programme and to illustrate some important achievements reached in specific areas. In addition, it is also intended to provide the access key to the documentation which was produced in the past years, so as to make the most significant technical material easily available for any possible future use

  13. Contracts for field projects and supporting research on enhanced oil recovery: Progress review No. 74, Quarter ending March 31, 1993

    Energy Technology Data Exchange (ETDEWEB)

    1994-03-01

    Accomplishments for the past quarter are presented for the following tasks: chemical flooding--supporting research; gas displacement--supporting research; thermal recovery--supporting research; geoscience technology; resource assessment technology; microbial technology; field demonstrations in high-priority reservoir classes; and novel technology. A list of available publication is also provided.

  14. Current status of RCA projects and strategies for future implementation

    International Nuclear Information System (INIS)

    Kim, Kyoung Pyo; Lee, Jeong Kong

    1998-12-01

    This report is intended to provide basic overall information about ways to promote technical cooperation within the framework of RCA to accelerate and coordinate cooperative activities in nuclear science and technology in Asia and the Pacific region through a thorough review on the current status and through suggesting future implementation strategies. The contents of this report include an overall introduction of RCA, guidelines and operating rules for RCA programmes, current status and future plans for RCA projects as well as the RCA vision for the next 25 years. By reviewing the current status and future implementation strategies for RCA projects, it will help to set up a national nuclear policy aimed at seeking maximum benefits from participation in RCA projects and to implement programmes for nuclear cooperation with Asian-Pacific countries. It is expected that as a lead country for the energy sector, which is one of five thematic areas for the year 1999 - 2000 cycle programmes, Korea will continue to make significant contributions towards the implementation of RCA programmes in the future. With this report, we plan to keep up with future developments as well as implement an effective cooperation with the countries in the region so that the opinion of Korea, one of the nuclear advanced countries in the region, can be fully reflected in the establishment of future plans for RCA programmes. (author). 3 refs., 5 tabs., 1 fig

  15. Status of the RA research reactor decommissioning project

    International Nuclear Information System (INIS)

    Ljubenov, V.; Nikolic, D.; Pesic, M.; Milosevic, M.; Kostic, Lj.; Steljic, M.; Sotic, O.; Antic, D. . E-mail address of corresponding author: vladan@vin.bg.ac.yu; Ljubenov, V.)

    2005-01-01

    The 6.5 MW heavy water RA research reactor at the VINCA Institute of Nuclear Sciences operated from 1959 to 1984. After 18 years of extended shutdown in 2002 it was decided that the reactor shutdown should be final. Preliminary decommissioning activities have been initiated by the end of 2002 under the Technical Co-operation Programme of the International Atomic Energy Agency. The objective of the project is to implement safe, timely and cost-effective decommissioning of the RA reactor up to unrestricted use of the site. Decommissioning project is closely related to two other projects: Safe Removal of the RA Reactor Spent Nuclear Fuel and Radioactive Waste Management in VINCA Institute. The main phases of the project include preparation of the detailed decommissioning plan, radiological characterization of the reactor site, dismantling and removal of the reactor components and structures, decontamination, final radiological site survey and the documentation of all the activities in order to obtain the approval for unrestricted use of the facility site. In this paper a review of the activities related to the preparation and realization of the RA reactor decommissioning project is given. Status of the project's organizational and technical aspects as for July 2004 are presented and plans for the forthcoming phases of the project realization are outlined. (author)

  16. European DataGrid project: status and plans

    International Nuclear Information System (INIS)

    Kunszt, P.

    2003-01-01

    The European DataGrid (EDG) project has reached, after 1.5 years, the middle of its lifetime. In this article we give an overview of the status, components, procedures and plans of the EDG project as of June 2002. The objective of the EDG project is to assist the next generation of scientific exploration, computation and analysis of large-scale data sets--from hundreds of terabytes to petabytes, across widely distributed scientific communities. The primary goal of the first phase of the EDG project was to assemble a distributed testbed to demonstrate that the EDG middleware components could be integrated into a production-quality computational Grid, as well as to gain experience with such a system. The very first version of the EDG testbed was deployed toward the end of 2001. At the first official European Union review of the project on March 1, 2002, it has been found that the project is on the right track to achieve its goals. Since then the EDG middleware, testbed components and procedures have been continuously refined according to the requirements of our user communities and our experience

  17. European DataGrid project Status and plans

    CERN Document Server

    Kunszt, Peter Z

    2003-01-01

    The European DataGrid (EDG) project has reached, after 1.5 years, the middle of its lifetime. In this article we give an overview of the status, components, procedures and plans of the EDG project as of June 2002. The objective of the EDG project is to assist the next generation of scientific exploration, computation and analysis of large-scale data sets - from hundreds of terabytes to petabytes, across widely distributed scientific communities. The primary goal of the first phase of the EDG project was to assemble a distributed testbed to demonstrate that the EDG middleware components could be integrated into a production-quality computational Grid, as well as to gain experience with such a system. The very first version of the EDG testbed was deployed toward the end of 2001. At the first official European Union review of the project on March 1, 2002, it has been found that the project is on the right track to achieve its goals. Since then the EDG middleware, testbed components and procedures have been conti...

  18. NST Quarterly

    International Nuclear Information System (INIS)

    1995-01-01

    NST Quarterly reports current development in nuclear science and technology in Malaysia. It keeps readers informed on the progress of research, services, application of nuclear science and technology, and other technical news. It highlights MINT activities and also announces coming events

  19. NST Quarterly

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-01-01

    NST Quarterly reports current development in nuclear science and technology in Malaysia. It keeps readers informed on the progress of research, services, application of nuclear science and technology, and other technical news. It highlights MINT activities and also announces coming events.

  20. Status of the KM3NeT project

    International Nuclear Information System (INIS)

    Katz, U.F.

    2009-01-01

    KM3NeT is a future research infrastructure in the Mediterranean Sea, hosting a cubic-kilometre scale neutrino telescope and nodes for associated sciences such as marine biology, oceanology and geophysics. The status of the KM3NeT project and the progress made in the EU-funded Design Study is reviewed. Some physics studies indicating the sensitivity of the KM3NeT neutrino telescope are highlighted and selected major technical design options to be further pursued are described. Finally, the remaining steps towards construction of KM3NeT will be discussed. This document reflects the status of the KM3NeT Conceptual Design Report (CDR), which has been presented to the public for the first time at the VLVnT08 Workshop.

  1. The CAREM project: Present status and development activities

    International Nuclear Information System (INIS)

    Boado Magan, H.J.; Ordonez, J.P.; Hey, A.

    1997-01-01

    The CAREM Project is a low power NPP of 25 Mwe, with an integrated self pressurized primary system. The cooling of the primary system is of the natural circulation type and several passive safety systems are included. The owner of the Project is Argentina's CNEA (Comision Nacional de Energia Atomica) and its associated company, INVAP, is the main contractor. The present status of the CAREM Project is presented. The possible evolution of the CAREM project is mentioned in relation with a new containment design. A short description of the Experimental Facilities, listed below, already in operation and under construction are also included: CAPCN High Pressure Loop. Natural convection loop to verify dynamic response and critical heat flux; RA-8. Critical Facility, designed and constructed for the CAREM Project (that may be used as a general uses facility); RPV lnternals. The whole assembly of absorbent rods, connecting rods and the rode guides are being constructed in a 1:1 scale. The aims of this experimental facility are vibration analysis and manufacturing parameters definitions. Control Drive Mechanisms. A series of verification and tests are being carried out on these within RPV Hydraulically driven mechanisms. Other development activities are mentioned in relation with the thermalhydraulics, Steam Generators and Control. (author)

  2. 78 FR 72109 - Quarterly Status Report of Water Service, Repayment, and Other Water-Related Contract Actions

    Science.gov (United States)

    2013-12-02

    ... continues negotiations on an operations, maintenance and replacement transfer contract with the Navajo... Status Report of Water Service, Repayment, and Other Water-Related Contract Actions AGENCY: Bureau of... individual contract actions may be published in the Federal Register and in newspapers of general circulation...

  3. 78 FR 46365 - Quarterly Status Report of Water Service, Repayment, and Other Water-Related Contract Actions

    Science.gov (United States)

    2013-07-31

    ..., Colorado, New Mexico, Texas, Utah, and Wyoming: Contracts for extraordinary maintenance and replacement... Status Report of Water Service, Repayment, and Other Water-Related Contract Actions AGENCY: Bureau of... individual contract actions may be published in the Federal Register and in newspapers of general circulation...

  4. 78 FR 72111 - Quarterly Status Report of Water Service, Repayment, and Other Water-Related Contract Actions

    Science.gov (United States)

    2013-12-02

    ...: Reclamation continues negotiations on an operations, maintenance and replacement transfer contract with the... Status Report of Water Service, Repayment, and Other Water-Related Contract Actions AGENCY: Bureau of... individual contract actions may be published in the Federal Register and in newspapers of general circulation...

  5. Status of SPIRAL. The radioactive beam project at GANIL

    International Nuclear Information System (INIS)

    Lieuvin, M.

    1995-01-01

    SPIRAL, a radioactive ion beam facility (RIB) is under construction at GANIL (Caen, France). The heavy ion beams of GANIL will be used to produce radioactive atoms by the ISOL method. After ionisation by an ECR ion source (ECRIS), the low energy radioactive beam is axially injected on the first orbit of a k=265 compact cyclotron. The final energy will range between 1.7 and 25 MeV/u (harmonics 5 to 2) and the accelerated ions will be sent to the existing GANIL experimental areas. The present status of the project is described. (author)

  6. Short status report on EFF and EAF projects

    International Nuclear Information System (INIS)

    Gruppelaar, H.

    1991-10-01

    A short status report is given on the European Fusion File (EFF) and European Activation File (EAF) projects. The EFF-2 data file is nearly finished and processing and benchmarking is underway. There is also a second version (EAF-2) of the activation file which is a very extensive and complete data base. Recently follow-up programmes have been defined for the introduction of EFF-2 to the user community after benchmarking and for further improvement of the quality of the two data files. There is extensive international cooperation, which is becoming increasingly important to solve remaining difficult problems. (author). 17 refs

  7. Licensee contractor and vendor inspection status report. Quarterly report, January-March 1986. Volume 10, No. 1

    International Nuclear Information System (INIS)

    1986-05-01

    The NRC vendor inspection focus has been shifted to vendor activities associated with nuclear plant operation, maintenance, and modifications, more than firms designing nuclear steam supply systems, architect engineering firms designing nuclear plants, and major equipment vendors. Results of 16 inspections are reported, giving for each organization inspected, their activity, inspection bases and scope, and any violations, nonconformances, or unresolved items found. The status of previous inspection findings are also given

  8. Status of the McClean project, Saskatchewan, Canada

    International Nuclear Information System (INIS)

    Giroux, M.

    1997-01-01

    The paper describes the status of development of the McClean Lake uranium production project. The project includes development of a new mine/mill complex located 10 kilometres west of the Rabbit Lake mine site, in the Athabaska region of northern Saskatchewan, Canada. This first Canadian uranium project since Key Lake was developed in the late 1970s, is planned to help provide the increasing need for uranium production during the rest of the 1990s and beyond. The report describes the geological model for the 6 unconformity-type uranium orebodies named: JEB; Sue A, B and C; and McClean Lake A and B. These deposits will be extracted using both open pit and underground mines. The report describes the history of exploration and development, as well as the progression of the environmental clearance process under the joint review panel of the Canadian and Saskatchewan governments. The Canadian $250 million project, operated by Cogema Resources, is jointly owned by Denison Mines Limited, Minatco Limited and OURD (Canada) Company Limited. It is scheduled to start producing uranium concentrate in 1997. (author). 1 ref., 10 figs

  9. Contracts for field projects and supporting research on enhanced oil recovery. Progress review No. 78, quarter ending March 31, 1994

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-05-01

    This report presents descriptions of various research projects and field projects concerned with the enhanced recovery of petroleum. Contract numbers, principal investigators, company names, and project management information is included.

  10. Comprehensive assessment of the status scientific and technical projects using Technology Project Readiness Level

    Directory of Open Access Journals (Sweden)

    A. N. Petrov

    2016-01-01

    Full Text Available The balanced methodology for assessing the Technology Project Readiness Level for commercialization (TPRL is proposed. TPRL allows to determine the dynamics and balance of development projects that use the standardized approaches used in assessing the readiness of the technology. Validation of the methodology undertaken for the projects of Federal target programs “Research and development on priority directions of development of scientific-technological complex of Russia for 2007–2013” and “Research and development on priority directions of development of scientific-technological complex of Russia for 2014–2020”. The obtained results showed the possibility of application of the methodology for the evaluation of projects, improving efficiency of expert activity in the evaluation of projects, monitoring the status of individual project and group of projects (portfolio. The application of the methodology allowed us to improve the management of individual project and portfolio of projects.Methodology TPRL will allow the implementers, industry partners, investors, and innovative industrial companies to improve the efficiency of its activities.

  11. Hazardous materials in aquatic environments of the Mississippi River Basin Project management. Technical quarterly progress report, April 1, 1996--June 30, 1996

    Energy Technology Data Exchange (ETDEWEB)

    McLachlan, J.; Ide, C.F.; O`Connor, S.

    1996-08-01

    This quarterly report summarizes accomplishments for the Project examining hazardous materials in aquatic environments of the Mississippi River Basin. Among the many research areas summarized are the following: assessment of mechanisms of metal-induced reproductive toxicity in aquatic species as a biomarker of exposure; hazardous wastes in aquatic environment;ecological sentinels of aquatic contamination in the lower Mississippi River System; remediation of selected contaminants; rapid on-site immunassay for heavy metal contamination; molecular mechanisms of developmental toxicity induced by retinoids and retinoid-like molecules; resuseable synthetic membranes for the removal of aromatic and halogenated organic pollutants from waste water; Effects of steroid receptor activation in neurendocrine cell of the mammalian hypothalamus; modeling and assessment of environmental quality of louisiana bayous and swamps; enhancement of environmental education. The report also contains a summary of publications resulting from this project and an appendix with analytical core protocals and target compounds and metals.

  12. 2. status colloquium of the project 'Applied ecology' (PAOe). Proceedings

    International Nuclear Information System (INIS)

    Breitenstein, A.; Scholz, W.; Waitzmann, M.; Zelesny, H.

    1994-01-01

    The 'Applied ecology' programme sponsors research on major subjects concerning application-oriented bases of nature conservation and environmental protection in the following sectors: 1. nature and landscape (succession research, scientific accompanying of measures restoring the natural condition of a landscape, nature conservation concepts and development of ecological paradigms); 2. ecotoxicology (further development and standardization of biological indication methods within the framework of the ecotoxicological register of effects of Baden-Wuertemberg, design of exposure models for forcasting long-term changes in Baden-Wuertemberg); 3. risk assessments and risk evaluations in environmental protection (selected ecological balances and development of ecological evaluation criteria).- On March 22nd and 23rd, 1994, the second status colloquium of the project ''Applied Ecology (PAOe)'' was held at Ettlingen. During this annual event, the results of 39 research projects in the above-mentioned major subject areas were presented and debated by 600 experts from science, administration and economy. This volume sums up the results of the research and demonstrates, at the same time, the range of the research projects sponsored under this scheme. (orig./VHE) [de

  13. Equity Oil Company BX in situ oil shale project, Piceance Basin, Colorado. Environmental quarter report, March 1-May 31, 1981

    Energy Technology Data Exchange (ETDEWEB)

    1981-06-12

    This report has been organized into three sections for ease of review. Section A - Air Resources covers data collected by the 100-foot tower between September and December 1980. Section B - Water Resources covers data collected since the last Quarterly Report. Section C - Aquatic Biology covers data collected since January 1981. Laboratory analysis results of all water samples show no significant changes from previous sample have occurred. The alluvial wells did exhibit slightly higher concentrations of phenols. Presently no baseline record exists for these wells to establish the normal levels of phenols in the alluvial ground water. Laboratory analysis of all sampling locations are presented in Appendix B. Aquatic biology covers data collected during the initial two aquatic biology field sampling trips of 1981. Benthic invertebrates, periphyton algae, and a fishery survey was conducted. Stream observations indicate that the stream habitat has remained unchanged since the August 1980 field visit. (ATT)

  14. Joint Force Quarterly. Issue 41, 2nd Quarter, April 2006

    Science.gov (United States)

    2006-04-01

    companies participated, a million more people would be actively looking for threats. Aguas de Amazonas, a subsidiary of Suez Environnement, a...9 Richard B. Myers, “A Word from the Chair- man,” Joint Force Quarterly 37 (2d Quarter 2005), 5. 10 Wald, 26. 11 “Suez— Aguas de Amazonas Water for...humanitarian duties. They have overseen over 130 humani- tarian projects worth in excess of $7.6 million and ranging from a medical center, to potable

  15. Status of the Fermilab Energy Doubler/Saver project

    International Nuclear Information System (INIS)

    1977-01-01

    The possibility of building a ring of superconducting magnets was considered very early in the design of the Fermilab main accelerator. It was concluded that the technology of superconducting magnets was not at that time, sufficiently advanced. Therefore, the main ring was designed and built with conventional magnets. However, space was left in the main-ring tunnel for a future ring of superconducting magnets. The Energy Doubler/Saver (ED/S) was initiated in 1972 as a project to build a ring of superconducting magnets with the objective of dramatically increasing the research potential of the Fermilab accelerators. This was to be accomplished at a moderate cost and in such a manner as to make possible a significant saving of electrical energy. A description is given of the evolution of this program as well as give a status report of the Ed/S research and development program

  16. The SuperB Project: Status and the Physics Reach

    International Nuclear Information System (INIS)

    Neri, Nicola

    2012-01-01

    The SuperB experiment is a next generation Super Flavour Factory expected to accumulate 75 ab −1 of data at the Υ(4S) in five years of nominal running, and will be built at the recently established Cabibbo Laboratory on the outskirts of Rome. In addition to running data at the Υ(4S), SuperB will be able to accumulate data from the ψ(3770) up to the Υ(6S). A polarized electron beam enables unique physics opportunities at SuperB. The large samples of B, D and τ decays that will be recorded at SuperB can be used to provide both stringent constraints on new physics scenarios, and over-constraints on the Standard Model. We present the status of the project as well as the physics potential of SuperB.

  17. Status of the Fermilab Energy Doubler/Saver project

    Energy Technology Data Exchange (ETDEWEB)

    1977-01-01

    The possibility of building a ring of superconducting magnets was considered very early in the design of the Fermilab main accelerator. It was concluded that the technology of superconducting magnets was not at that time, sufficiently advanced. Therefore, the main ring was designed and built with conventional magnets. However, space was left in the main-ring tunnel for a future ring of superconducting magnets. The Energy Doubler/Saver (ED/S) was initiated in 1972 as a project to build a ring of superconducting magnets with the objective of dramatically increasing the research potential of the Fermilab accelerators. This was to be accomplished at a moderate cost and in such a manner as to make possible a significant saving of electrical energy. A description is given of the evolution of this program as well as give a status report of the Ed/S research and development program.

  18. FAIR - Facility, Research Program and Status of the Project

    International Nuclear Information System (INIS)

    Majka, Z.

    2011-01-01

    The international Facility for Antiproton and Ion Research (FAIR) in Europe will provide a worldwide science community with a unique and technically innovative accelerator system to perform forefront research in the sciences concerned with the basic structure of matter, and in intersections with other fields. The facility will deliver an extensive range of primary and secondary particle beams from protons and their antimatter partners, antiprotons, to ion beams of all chemical elements up to the heaviest, uranium, with in many respects unique properties and intensities. The paper will include overview of the new facility design and research programs to be carried out there. The current status of the FAIR project will be also presented. (author)

  19. New capacity and the status of major projects

    International Nuclear Information System (INIS)

    Osborne, R.; Eastman, P.; Bajc, F.; Hawthorne, D.

    2003-01-01

    This session included highlights from from four guest speakers who were asked to comment on new electricity capacity in Ontario and the status of major projects. The summer of 2002 was one of the hottest on record in Ontario and presented a challenge for suppliers of electricity to meet demand. Some of the extra demand was met by interties. Imports provided 5 per cent of consumption in July and 8 per cent in August. TransAlta and ATCO are currently involved in 2 major projects to add generation capacity. In addition, Ontario Power Generation is getting more production from its existing nuclear plants and has made significant investment to get greater efficiency and increase safety margins at the plants. One panelist suggested that nuclear power is a key part of meeting Canada's Kyoto greenhouse reduction obligations. It was emphasized that market participants should allow time to let the market work and let a free market respond to price signals. It was argued that consumers expect and rely too much on low-cost electricity and are therefore not encouraged to conserve energy or look into new generation requirements. figs

  20. Quarterly Report 11 for the Period October 1978 - December 1978 and Proceedings of the 11th Project Integration Meeting

    Energy Technology Data Exchange (ETDEWEB)

    None

    1979-10-01

    This report describes progress made by the Low-Cost Solar Array Project during the period October through December 1978. It includes task reports on silicon material processing, large-area silicon sheet development, encapsulation mate3rials testing and development, Project engineering and operations, and manufacturing techniques, plus the steps taken to integrate these efforts. it also includes a report on and copies of viewgraphs presented at the Project Integration Meeting held December 13-14, 1978.

  1. Contracts for field projects and supporting research on enhanced oil recovery. Progress review number 83, quarter ending June 30, 1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-08-01

    Summaries of 41 research projects on enhanced recovery are presented under the following sections: (1) chemical flooding; (2) gas displacement; (3) thermal recovery; (4) geoscience technology; (5) resource assessment technology; and (6) reservoir classes. Each presentation gives the title of the project, contract number, research facility, contract date, expected completion data, amount of the award, principal investigator, and DOE program manager, and describes the objectives of the project and a summary of the technical progress.

  2. Aviation Safety Program: Weather Accident Prevention (WxAP) Project Overview and Status

    Science.gov (United States)

    Nadell, Shari-Beth

    2003-01-01

    This paper presents a project overview and status for the Weather Accident Prevention (WxAP) aviation safety program. The topics include: 1) Weather Accident Prevention Project Background/History; 2) Project Modifications; 3) Project Accomplishments; and 4) Project's Next Steps.

  3. Final Status Survey for the Largest Decommissioning Project on Earth

    International Nuclear Information System (INIS)

    Dubiel, R.W.; Miller, J.; Quayle, D.

    2006-01-01

    To assist the United States Department of Energy's (US DOE's) re-industrialization efforts at its gaseous diffusion site in Oak Ridge, Tennessee, known as the East Tennessee Technology Park (ETTP), the US DOE awarded a 6-year Decontamination and Decommissioning (D and D) contract to BNG America (formerly BNFL Inc.) in 1997. The ETTP 3-Building D and D Project included the removal and disposition of the materials and equipment from the K-33, K-31, and K-29 Gaseous Diffusion Plant buildings. The three buildings comprise more than 4.8 million square feet (446,000 square meters) of floor surface area and more than 350 million pounds (148 million kilograms) of hazardous and radioactively contaminated material, making it the largest nuclear D and D project in progress anywhere in the world. The logistical hurdles involved in a project of this scope and magnitude required an extensive amount of Engineering and Health Physics professionals. In order to accomplish the Final Status Survey (FSS) for a project of this scope, the speed and efficiency of automated survey equipment was essential. Surveys of floors, structural steel and ceilings up to 60 feet (18 meters) were required. The FSS had to be expanded to include additional remediation and surveys due to characterization surveys and assumptions regarding the nature and extent of contamination provided by the US DOE. Survey design and technical bases had to consider highly variable constituents; including uranium from depleted to low enrichment, variable levels of Technetium-99 and transuranic nuclides, which were introduced into the cascade during the 1960's when recycled uranium (RU) from Savannah River was re-enriched at the facility. The RU was transported to unexpected locations from leaks in the cascade by complex building ventilation patterns. The primary survey tool used for the post remediation and FSS was the Surface Contamination Monitor (SCM) and the associated Survey Information Management System (SIMS

  4. 1st quarterly report 1977

    International Nuclear Information System (INIS)

    1977-06-01

    The present report describes the activities carried out in the 1st quarter of 1977 at the Gesellschaft fuer Kernforschung in Karlsruhe or on its behalf in the framework of the fast breeder project (PSB). The problems and main results of the partial projects fuel rod development, materials testing, reactor physics, reactor safety and reactor technology are presented. (RW) [de

  5. Status of the tandem FEL project development in Israel

    International Nuclear Information System (INIS)

    Benzvi, I.; Sokolowski, J.; Jerby, E.; Chomski, D.; Ruschin, S.

    1989-01-01

    The authors report the status of a collaborative research project development aimed toward construction of an IR FEL based on the EN tandem electrostatic accelerator of the Weizmann Institute of Science. A preliminary feasibility demonstration project yielded encouraging progress in three aspects: (1) Electron gun and accelerator conversion: A 50-kV 1-A electron gun injector was designed, built, tested, and assembled on the 6-MeV tandem accelerator which was previously converted and conditioned to operate as an electron accelerator in a positively charged HV terminal configuration. Contrary to the configuration of the only electrostatic accelerator FEL demonstrated so far, the electron gun and multistage depressed collector are connected to the ground, and the wiggler is placed in the HV terminal of the straight geometry tandem accelerator. This configuration promises to provide a high current high quality e-beam. (2) Electron-beam transport: The first installation of the electron optical beam recovery system yielded transport efficiency of 80%. Substantial improvement is expected with planned electron optics modifications. An effect, highly significant for realizing long pulse (quasi-cw) FEL operation, was observed experimentally. Due to the damping effect of the accelerator column capacitance network, the voltage terminal stayed constant for milliseconds even with poor beam transport efficiency. This points to the possibility of developing a long pulse FEL which may operate at a single longitudinal mode. (3) Wiggler development: A conventional 4.4-cm period SmCo planar wiggler was acquired and evaluated using a recently constructed floating wire magnetic field measurement setup

  6. Contracts for field projects and supporting research on enhanced oil recovery. Progress review number 86, quarter ending March 31, 1996

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-05-01

    Summaries are presented for 37 enhanced oil recovery contracts being supported by the Department of Energy. The projects are grouped into gas displacement methods, thermal recovery methods, geoscience technology, reservoir characterization, and field demonstrations in high-priority reservoir classes. Each summary includes the objectives of the project and a summary of the technical progress, as well as information on contract dates, size of award, principal investigator, and company or facility doing the research.

  7. The status report on the nuclear data project in Korea

    Energy Technology Data Exchange (ETDEWEB)

    Kim, G.N.; Baek, W.Y.; Kang, H.S.; Choi, J.Y.; Cho, M.H.; Ko, I.S.; Namkung, W. [Pohang Accelerator Laboratory, POSTECH, Pohang (Korea, Republic of); Chang, J.H.

    1999-03-01

    The nuclear data project as one of the nation-wide nuclear R and D programs was launched by the Korea Atomic Energy Research Institute (KAERI) in 1996. Its main goals are to establish a nuclear data system, to construct the infrastructure for the nuclear data productions and evaluations, and to develop a highly reliable nuclear data system. In order to build the infrastructure for the nuclear data production, KAERI wants to build an intense pulsed neutron source by utilizing accelerator facilities, technologies, and manpower at the Pohang Accelerator Laboratory (PAL). The PAL proposed the Pohang Neutron Facility (PNF), which consists of a 100-MeV electron linac, a water-cooled Ta target, and at least three different time-of-flight (TOF) paths. The 100-MeV electron linac was designed and constructed based on experiences obtained from construction and operation of the 2-GeV linac at PAL. We report a status report on the nuclear data production and evaluation in Korea. (author)

  8. IRIS project update: status of the design and licensing activities

    International Nuclear Information System (INIS)

    Petrovic, B.; Carelli, M.

    2004-01-01

    This paper presents an overview of the current status of the IRIS (International Reactor Innovative and Secure) project, focusing on the design and licensing activities. An update relative to the previous presentation at the 4th HND Conference is provided, highlighting some of the main accomplishments over the past two years. After successfully completing the conceptual design phase, IRIS is now finalizing the preliminary design as well. The pre-application licensing review with the U.S. NRC has been initiated in October of 2002. The safety-by-design approach and PRA-guided design open the possibility to aim for licensing not requiring off-site emergency response planning. Multiple single-unit and twin-unit site layouts have been developed within the ESP (Early Site Permit) program currently pursued by three U.S. power utilities. Desalination and district heating options have recently been added to the base design. Staggered construction schedules of multiple units may be applied to optimize cash-flow and minimize the required investment, making IRIS a financially attractive option, even for economies with limited investment capabilities. Because of its modularity, compatibility with smaller/medium grids, and enabling gradual build of new generating capacity matching the needs, IRIS has a large potential in the worldwide market.(author)

  9. Status Report: Mathematics Curriculum-Development Projects Today

    Science.gov (United States)

    Arithmetic Teacher, 1972

    1972-01-01

    Brief reports on the Cambridge Conference on School Mathematics, Comprehensive School Mathematics Program, Computer-Assisted Instruction Projects at Stanford, Individually Prescribed Instruction Project, The Madison Project, Mathematics/Science Learning System, MINNEMAST, and School Mathematics Study Group. (MM)

  10. Instantaneous Project Controls: Current Status, State of the Art, Benefits, and Strategies

    Science.gov (United States)

    Abbaszadegan, Amin

    2016-01-01

    Despite advancements in construction and construction-related technology, capital project performance deviations, typically overruns, remain endemic within the capital projects industry. Currently, management is generally unaware of the current status of their projects, and thus monitoring and control of projects are not achieved effectively. In…

  11. General concept and present status of the AMS - project

    International Nuclear Information System (INIS)

    Stan-Sion, C.; Plostinaru, D.; Catana, L.; Radulescu, M.; Marinescu, L.; Dima, R.

    1998-01-01

    The Institute of Nuclear Physics and Engineering, IFIN-HH, Bucharest started in 1996 the Construction Project for an AMS facility in Bucharest. The Project is supported by the German-Romanian scientific cooperation project RUM-013-97. In the frame of this project, scientific research, construction activities of electronic and mechanical devices and activities for calibration and optimization were performed. The activities in this year are concentrated on experimental tests and optimization of the AMS analysis procedure and on improving the tandem acceleration and transmission capability. These are as follows: - construction and tests of a high current sputter source, with spherical ionizer and automatic many-sample changer. Experimental tests and measurements of emittance and beam profile; - construction of the Injector Platform; - construction and tests of a Bragg - charged particle detector; - calibration and optimization experiments of the AMS ensemble. The AMS facility is based on the 8 MV - FN tandem accelerator and has the following main components: the AMS ion injector, a Wien - velocity filter, a 60 angle bending magnet and the particle detection system. For heavy particle detection we constructed a Bragg ionization chamber. This should be used for standard AMS measurements. A specific part of the AMS facility represents the AMS injector deck. The main components are: the high current sputter source, the analyzing double focusing magnet, two optical systems, a four-slit beam defining system in front of the analyzing magnet and a four-slit aperture with remote controlled Faraday cup (for beam current integration of stable isotopes) after the magnet. Finally, the pre-acceleration tube (40 kV) connects the ensemble to the ground potential of the accelerator beam line. For AMS measurements, the sputter ion source is able to provide both high beam current and small beam emittance. These characteristics are necessary in order to achieve high analyzing

  12. Update on the status of the West Valley demonstration project

    International Nuclear Information System (INIS)

    Greeves, J.T.; Camper, L.W.; Orlando, D.A.; Glenn, C.J.; Buckley, J.T.; Giardina, P.A.

    2002-01-01

    From 1966 to 1972, under an Atomic Energy Commission (AEC) license, Nuclear Fuel Services (NFS) reprocessed 640 metric tons of spent fuel at its West Valley, New York, facility-, the only commercial spent fuel reprocessing plant in the U.S. The facility shut down in 1972, for modifications to increase its seismic stability and to expand its capacity. In 1976, without restarting the operation, NFS withdrew from the reprocessing business and returned control of the facilities to the site owner, the New York State Energy Research and Development Authority (NYSERDA). The reprocessing activities resulted in about 2.3 million liters (600,000 gallons) of liquid high-level waste (HLW) stored below ground in tanks, other radioactive wastes, and residual radioactive contamination. The West Valley site was licensed by AEC, and then the U.S. Nuclear Regulatory Commission (NRC), until 1981, when the license was suspended to execute the 1980 West Valley Demonstration Project (WVDP) Act. The WVDP Act outlines the responsibilities of the U.S. Department of Energy (DOE), NRC, and NYSERDA at the site, including the NRC's responsibility to develop decommissioning criteria for the site. The Commission published the final policy statement on decommissioning criteria for the WVDP at the West Valley site after considering comments from interested stakeholders. In that regard, the Commission prescribed the License Termination Rule (LTR) criteria for the WVDP at the West Valley site, reflecting the fact that the applicable decommissioning goal for the entire NRC-licensed site is compliance with the requirements of the LTR. This paper will describe the history of the site, provide an update of the status of the decommissioning of the site and an overview of the technical and policy issues facing Federal and State regulators and other stakeholders as they strive to complete the remediation of the site. (author)

  13. Coordinators' experience-self evaluation of project development status

    International Nuclear Information System (INIS)

    Sijali, I.V

    2009-01-01

    Outlines the progress of the project as follows, design cleared ny NLO, PMO and team refined the submitted project design to improve it's quality. Comments and any questions invited deadline 23 may 2008, endorsement of the project by Tuesday 24 June 2008 and project completed

  14. Status Review of Wildlife Mitigation, Columbia Basin Hydroelectric Projects, Washington Facilities (Intrastate) Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Howerton, Jack

    1984-11-01

    This report was prepared for BPA in fulfillment of section 1004 (b)(1) of the Pacific Northwest Electric Power Planning and Conservation Act of 1980, to review the status of past, present, and proposed future wildlife planning and mitigation program at existing hydroelectric projects in the Columbia River Basin. The project evaluations will form the basis for determining any needed remedial measures or additional project analysis. Projects addressed are: Merwin Dam; Swift Project; Yale Project; Cowlitz River; Boundary Dam; Box Canyon Dam; Lake Chelan; Condit Project; Enloe Project; Spokane River; Tumwater and Dryden Dam; Yakima; and Naches Project.

  15. Projects at the Western Environmental Technology Office. Quarterly technical progress report, July 1, 1995--September 30, 1995

    International Nuclear Information System (INIS)

    1996-01-01

    The goal of this project is to demonstrate the technical and economic feasibility of commercializing a biotechnology that uses plants to remediate soils, sediments, surface waters, and groundwaters contaminated by heavy metals and radionuclides. This technology, known as phytoremediation, is particularly suited to remediation of soils or water where low levels of contaminants are widespread. Project objectives are to provide an accurate estimate of the capability and rate of phytoremediation for removal of contaminants of concern from soils and groundwaters at Department of Energy (DOE) sites and to develop data suitable for engineering design and economic feasibility evaluations, including methods for destruction or final disposition of plants containing contaminants of concern. The bioremediation systems being evaluated could be less expensive than soil removal and treatment systems, given the areal extent and topography of sites under consideration and the investment of energy and money in soil-moving and -treating processes. In situ technology may receive regulatory acceptance more easily than ex situ treatments requiring excavation, processing, and replacement of surface soils. In addition, phytoremediation may be viable for cleanup of contaminated waters, either as the primary treatment or the final polishing stage, depending on the contaminant concentrations and process economics considerations

  16. Projects at the Western Environmental Technology Office. Quarterly technical progress report, July 1, 1995--September 30, 1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-01-01

    The goal of this project is to demonstrate the technical and economic feasibility of commercializing a biotechnology that uses plants to remediate soils, sediments, surface waters, and groundwaters contaminated by heavy metals and radionuclides. This technology, known as phytoremediation, is particularly suited to remediation of soils or water where low levels of contaminants are widespread. Project objectives are to provide an accurate estimate of the capability and rate of phytoremediation for removal of contaminants of concern from soils and groundwaters at Department of Energy (DOE) sites and to develop data suitable for engineering design and economic feasibility evaluations, including methods for destruction or final disposition of plants containing contaminants of concern. The bioremediation systems being evaluated could be less expensive than soil removal and treatment systems, given the areal extent and topography of sites under consideration and the investment of energy and money in soil-moving and -treating processes. In situ technology may receive regulatory acceptance more easily than ex situ treatments requiring excavation, processing, and replacement of surface soils. In addition, phytoremediation may be viable for cleanup of contaminated waters, either as the primary treatment or the final polishing stage, depending on the contaminant concentrations and process economics considerations.

  17. Trend chart: wind power. Forth quarter 2016

    International Nuclear Information System (INIS)

    Coltier, Yves

    2017-02-01

    This publication presents the wind energy situation of continental France and overseas territories during the forth quarter 2016: total connected load, new connected facilities, regional distribution of wind power production, evolution of quarterly production, distribution of facilities versus power, evolution forecasts of the French wind power park, projects in progress, detailed regional results, methodology used

  18. Trend chart: wind power. First quarter 2016

    International Nuclear Information System (INIS)

    Reynaud, Didier

    2016-05-01

    This publication presents the wind energy situation of continental France and overseas territories during the first quarter 2016: total connected load, new connected facilities, regional distribution of wind power production, evolution of quarterly production, distribution of facilities versus power, evolution forecasts of the French wind power park, projects in progress, detailed regional results, methodology used

  19. Trend chart: wind power. Second quarter 2017

    International Nuclear Information System (INIS)

    2017-08-01

    This publication presents the wind energy situation of continental France and overseas territories during the second quarter 2017: total connected load, new connected facilities, regional distribution of wind power production, evolution of quarterly production, distribution of facilities versus power, evolution forecasts of the French wind power park, projects in progress, detailed regional results, revision of results

  20. Trend chart: wind power. Fourth quarter 2017

    International Nuclear Information System (INIS)

    Moreau, Sylvain

    2018-02-01

    This publication presents the wind energy situation of continental France and overseas territories during the fourth quarter 2017: total connected load, new connected facilities, regional distribution of wind power production, evolution of quarterly production, distribution of facilities versus power, evolution forecasts of the French wind power park, projects in progress, detailed regional results, revision of results

  1. Trend chart: wind power. Third quarter 2016

    International Nuclear Information System (INIS)

    Reynaud, Didier

    2016-11-01

    This publication presents the wind energy situation of continental France and overseas territories during the third quarter 2016: total connected load, new connected facilities, regional distribution of wind power production, evolution of quarterly production, distribution of facilities versus power, evolution forecasts of the French wind power park, projects in progress, detailed regional results, methodology used

  2. Trend chart: wind power. Second quarter 2016

    International Nuclear Information System (INIS)

    Reynaud, Didier

    2016-08-01

    This publication presents the wind energy situation of continental France and overseas territories during the second quarter 2016: total connected load, new connected facilities, regional distribution of wind power production, evolution of quarterly production, distribution of facilities versus power, evolution forecasts of the French wind power park, projects in progress, detailed regional results, methodology used

  3. Trend chart: wind power. Third quarter 2017

    International Nuclear Information System (INIS)

    2017-11-01

    This publication presents the wind energy situation of continental France and overseas territories during the third quarter 2017: total connected load, new connected facilities, regional distribution of wind power production, evolution of quarterly production, distribution of facilities versus power, evolution forecasts of the French wind power park, projects in progress, detailed regional results, revision of results

  4. Trend chart: wind power. First quarter 2017

    International Nuclear Information System (INIS)

    2017-05-01

    This publication presents the wind energy situation of continental France and overseas territories during the first quarter 2017: total connected load, new connected facilities, regional distribution of wind power production, evolution of quarterly production, distribution of facilities versus power, evolution forecasts of the French wind power park, projects in progress, detailed regional results, methodology used

  5. Trend chart: wind power. Forth quarter 2015

    International Nuclear Information System (INIS)

    Reynaud, Didier

    2016-02-01

    This publication presents the wind energy situation of continental France and overseas territories during the forth quarter 2015: total connected load, new connected facilities, regional distribution of wind power production, evolution of quarterly production, distribution of facilities versus power, evolution forecasts of the French wind power park, projects in progress, detailed regional results, methodology used

  6. Trend chart: wind power. Third quarter 2015

    International Nuclear Information System (INIS)

    Reynaud, Didier

    2015-11-01

    This publication presents the wind energy situation of continental France and overseas territories during the third quarter 2015: total connected load, new connected facilities, regional distribution of wind power production, evolution of quarterly production, distribution of facilities versus power, evolution forecasts of the French wind power park, projects in progress, detailed regional results, methodology used

  7. Cogeneration and Small Power Production Quarterly Report to the California Public Utilities Commission Second Quarter 1983

    Energy Technology Data Exchange (ETDEWEB)

    None

    1983-01-01

    In the Second Quarter of 1983, the number of signed contracts and committed projects rose from 223 to 240, with a total estimated nominal capacity of these projects of 1,449 MW. Of this nominal capacity, about 361 MW is operational, and the balance is under contract for development. A map indicating the location of currently operating facilities is provided as Figure A. Of the 240 signed contracts and committed projects, 75 were cogeneration, solid waste, or biomass projects with a potential of 740 MW. PG and E also had under active discussion 32 cogeneration projects that could generate a total of 858 MW to 921 MW, and 10 solid waste/biomass projects with a potential of 113 MW to 121 MW. Two contracts have been signed with geothermal projects, capable of producing 83 MW. There are 6 solar projects with signed contracts and a potential of 36 MW, as well as another solar project under active discussion for 30 MW. Wind farm projects under contract number 19, with a generating capability of 471 MW. Also, discussions are being conducted with 12 wind farm projects, totaling 273 to 278 MW. There are 89 wind projects of 100 kW or less with signed contracts and a potential of almost 1 MW, as well as 10 other projects under active discussion. There are 47 hydroelectric projects with signed contracts and a potential of 110 MW, as well as 65 projects under active discussion for 175 MW. In addition, there are 30 hydroelectric projects, with a nominal capacity of 291 MW, that PG and E is constructing or planning to construct. Table A displays the above information. In tabular form, in Appendix A, are status reports of the projects as of June 30, 1983.

  8. The PEP-II Project: Low-Energy Ring Design and Project Status

    International Nuclear Information System (INIS)

    Zisman, Michael S.

    2006-01-01

    We describe the present status of the PEP-II project. The project comprises four major systems: Injector, High-Energy Ring (HER), Low-Energy Ring (LER), and Interaction Region (IR). We focus in detail on the design of the LER, as its parameters and requirements are most closely related to those required for the Beijing Tau-Charm Factory rings. The PEP-II LER is a high-current, 3.1-GeV positron ring mounted above the 9-GeV HER. The LER uses a wiggler located in one of its six straight sections to provide emittance control and additional damping. We describe the rather complicated IR, which must transport the LER beam into the plane of the HER, focus it to a common beam size, and separate the beams after the head-on collisions. Both permanent magnet and conventional electromagnets are used in this area. The LER lattice has now adopted a simplified non-interleaved sextupole correction scheme that has reduced the required number of sextupoles substantially. We describe the LER vacuum system, one of the most challenging subsystems in PEP-II. It employs several technologies. In the arcs, aluminum extrusions and titanium sublimation pumps are employed; the straight sections use stainless steel chambers with lumped ion pumps. In the wiggler area, an extended copper photon dump with nonevaporable getter (NEG) pumps is employed to handle the very large synchrotron radiation power. The design of the room-temperature RF system, the bunch-by-bunch longitudinal and transverse feedback systems, and some of the special diagnostics will be described briefly. The PEP-II project remains on schedule to begin commissioning of the HER in April 1997, followed by the LER a year later

  9. Analysis of the Status and Impacts of NCTR Projects

    Science.gov (United States)

    2012-08-01

    The National Center for Transit Research (NCTR) at the University of South Florida (USF) assessed the implementation status and identified the outcomes and impacts of the results of 30 Florida Department of Transportation -sponsored NCTR research pro...

  10. Status Review of Wildlife Mitigation, Columbia Basin Hydroelectric Projects, Columbia River Mainstem Facilities, 1984 Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Howerton, Jack; Hwang, Diana

    1984-11-01

    This report reviews the status of past, present, and proposed future wildlife planning and mitigation programs at existing hydroelectric projects in the Columbia River Basin. The project evaluations will form the basis for determining any needed remedial measures or additional project analysis. Each hydropower facility report is abstracted separately for inclusion in the Energy Data Base.

  11. Hazardous materials in aquatic environments of the Mississippi River Basin. Quarterly project status report, July 1, 1994--September 30, 1994

    International Nuclear Information System (INIS)

    1994-01-01

    This document references information pertaining to the presence of hazardous materials in the Mississippi River Basin. Topics discussed include: The biological fate, transport, and ecotoxicity of toxic and hazardous wastes; biological uptake and metabolism; sentinels of aquatic contamination; bioremediation; microorganisms; biomarkers of exposure and ecotoxicity; expert geographical information systems for assessing hazardous wastes in aquatic environments; and enhancement of environmental education at Tulane and Xavier

  12. ARPA-E Program: Advanced Management Protection of Energy Storage Devices (AMPED) - Fifth Quarterly Project Report - FY14 Q1

    Energy Technology Data Exchange (ETDEWEB)

    Farmer, Joseph [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2013-12-13

    -discharge cycling at various temperatures, thereby enabling earlier warning of thermal runaway than possible with external sensors. Ultimately, the team plans to extend this work to include: (12) flexible wireless controllers, also using Bluetooth 4.0 standard, essential for balancing large-scale battery packs. LLNL received $925K for this project, and has $191K remaining after accomplishing these objectives.

  13. Quarterly environmental data summary for fourth quarter 1997

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-12-31

    The Quarterly Environmental Data Summary (QEDS) for the fourth quarter of 1997 is prepared in support of the Weldon Spring Site Remedial Action Project Federal Facilities Agreement. The data presented constitute the QEDS. The data were received from the contract laboratories, verified by the Weldon Spring Site verification group and, except for air monitoring data and site KPA generated data (uranium analyses), merged into the data base during the fourth quarter of 1997. Air monitoring data presented are the most recent complete sets of quarterly data. Air data are not stored in the data base and KPA data are not merged into the regular data base. Significant data, defined as data values that have exceeded defined ``above normal`` level 2 values, are discussed in this letter for Environmental Monitoring Plan (EMP) generated data only. Above normal level 2 values are based, in ES and H procedures, on historical high values, DOE Derived Concentration Guides (DCGs), NPDES limits and other guidelines. The procedures also establish actions to be taken in response to such data. Data received and verified during the fourth quarter were within a permissible range of variability except for those which are detailed.

  14. Tank Vapor Characterization Project: Annual status report for FY 1996

    International Nuclear Information System (INIS)

    Silvers, K.L.; Fruchter, J.S.; Huckaby, J.L.; Almeida, T.L.; Evans, J.C. Jr.; Pool, K.H.; Simonen, C.A.; Thornton, B.M.

    1997-01-01

    In Fiscal Year 1996, staff at the Vapor Analytical Laboratory at Pacific Northwest National Laboratory performed work in support of characterizing the vapor composition of the headspaces of radioactive waste tanks at the Hanford Site. Work performed included support for technical issues and sampling methodologies, upgrades for analytical equipment, analytical method development, preparation of unexposed samples, analyses of tank headspaces samples, preparation of data reports, and operation of the tank vapor database. Progress made in FY 1996 included completion and issuance of 50 analytical data reports. A sampling system comparison study was initiated and completed during the fiscal year. The comparison study involved the vapor sampling system (VSS), a truck-based system, and the in situ vapor sampling system (ISVS), a cart-based system. Samples collected during the study were characterized for inorganic, permanent gases, total non-methane organic compounds and organic speciation by SUMMA trademark and TST methods. The study showed comparable sampling results between the systems resulting in the program switching from the VSS to the less expensive ISVS methodology in late May 1996. A temporal study was initiated in January 1996 in order to understand the influences seasonal temperatures changes have on the vapors in the headspace of Hanford waste tanks. A holding time study was initiated in the fourth quarter of FY 1996. Samples were collected from tank S-102 and rushed to the laboratory for time zero analysis. Additional samples will be analyzed at 1, 2, 4, 8, 16, and 32 weeks

  15. Status of the project of Novosibirsk high power FEL

    Energy Technology Data Exchange (ETDEWEB)

    Pinayev, I.V.; Erg, G.I.; Gavrilov, N.G. [Budker Institute of Nuclear Physics, Novosibirsk (Russian Federation)] [and others

    1995-12-31

    The project of IR FEL for the Siberian Center of photochemical researches is described. The distinguished features of this project are the use of the race-track microtron-recuperator and the {open_quotes}electron output of radiation{close_quotes}. The building for the machine is under reconstruction now. About half of hardware has been manufactured. The assembly of installation began.

  16. The ANGSTREM project: present status and development activities

    International Nuclear Information System (INIS)

    Stepanov, V.S.; Legyuenko, S.K.; Grigoriev, O.G.; Gromov, B.F.; Dedul, A.V.; Leonchyk, M.P.; Pashkin, Yu.G.; Pankratov, D.V.; Chekunov, V.V.; Skorikov, D.E.

    1998-01-01

    The project ANGSTREM of a modular-transportable nuclear power-and-heating station with assured safety for remote areas is described. The station is based on fast nuclear reactor cooling by a lead-bismuth eutectic. The possible evolution of the project is mentioned in relation to possible new application - sea water desalination or refrigeration plants. (author)

  17. Status of the MCNPtrademark/LCStrademark merger project

    International Nuclear Information System (INIS)

    Hughes, H.G.; Adams, K.J.; Chadwick, M.B.; Comly, J.C.; Frankle, S.C.; Hendricks, J.S.; Little, R.C.; Prael, R.E.; Waters, L.S.; Young, P.G.

    1998-01-01

    The MCNPX code is now in limited release in a beta-test version. We provide a brief status report on the physics modules now in the code and of the enhanced capabilities to use new evaluated neutron data. We also present new benchmark calculations in which LAHET and MCNPX are compared with experimental results from the Japan Atomic Energy Research Institute

  18. Present status of research within the International Project

    International Nuclear Information System (INIS)

    Anon.

    1975-01-01

    The short report enumerates the studies which are now completed by the International Project in the Field of Food Irradiation and the studies to be continued. New feeding studies with irradiated fish, rice, spices and mangoes are performed. (MG) [de

  19. Status and prospects of the FaCT project

    International Nuclear Information System (INIS)

    Nagaoki, Yoshihiro; Kikuchi, Shin; Ichimiya, Masakazu

    2008-01-01

    'Fast Reactor Cycle Technology Development (FaCT)' project has been conducted since 2006. In this project, design study and research and development (R and D) on innovative technologies for fast reactor (FR) cycle system are implemented in order to present the conceptual designs of commercial and demonstration facilities by 2015 and start operating demonstration fast reactor in 2025. The R and Ds has been stepped forward into the development stage to establish the realization of innovative technologies which bring excellent performance to fast reactor cycle system. The purpose of R and D by 2010 is to decide whether innovative technologies shall be adopted. So promoting R and D of FR, the project governance was organized. Furthermore, several possible R and D have been effectively carried out within the frameworks of international cooperation, such as Global Nuclear Energy Partnership (GNEP), Generation IV International Forum (GIF), and International Project on Innovative Nuclear Reactors and Fuel Cycles (INPRO). (author)

  20. The EFF Project Status and the NEA Nuclear Data Services

    International Nuclear Information System (INIS)

    Henriksson, H.; Kodeli, I.; Nordborg, C.; Forrest, R.; Batistoni, P.; Fischer, U.

    2006-01-01

    The OECD Nuclear Energy Agency (NEA) Data Bank is part of an international network of data centres in charge of the compilation and dissemination of basic nuclear data. Through its activities in the reaction data field, the NEA participates in the production of data and their distribution to its users. The NEA Data Bank administrates the collection and validation as well as the distribution of the Joint Evaluated Fusion and Fission (JEFF) library. The JEFF project has evolved from two separate projects, namely the European Fusion File (EFF) and the Joint Evaluated File (JEF), to JEFF with the latest release of the library, JEFF-3.1, in May 2005. The EFF Project is a collaborative project with work funded by the European Fusion Development Agreement (EFDA). The tasks within the project comprise new data evaluation and verification of activation and transport data, calculation methods and validation via integral experiments. The EFF project brings together all available expertise in Europe, relating to the nuclear data requirements of existing and future fusion devices. EFF contributed greatly to the successful release of the internationally recognised nuclear data library JEFF-3.1. The NEA Working Party on International Nuclear Data Evaluation Co-operation (WPEC) is established to promote the exchange of information on nuclear data evaluations, measurements, nuclear model calculations and validation. WPEC provides a framework for co-operative activities between the participating projects, such as the high priority request list that is a collection of experimental data requests of special interest in a certain project, such as JEFF or ITER. The NEA provides also computer program services for nuclear energy and radiation physics applications. Of special interest for fusion applications are the integral experiments, such as SINBAD, with radiation shielding and dosimetry experiments including many fusion neutronics shielding experiments. (author)

  1. The status of the LANSCE refurbishment project (LANSCE-R)

    International Nuclear Information System (INIS)

    Erickson, John Leonard; Jones, Kevin; Streve, Michael

    2008-01-01

    The Los Alamos Neutron Science Center (LANSCE) accelerator is an 800-MeV proton linac that drives user facilities for isotope production, proton radiography, ultra-cold neutrons, weapons neutron research and various sciences using neutron scattering. The LANSCE Refurbishment Project (LANSCE-R) is an ambitious project to refurbish key elements of the LANSCE accelerator that are becoming obsolete or nearing end-of-life. The conceptual design phase for the project is funded and underway. The 5 year, $170M (US) project will enable future decades of reliable, high-performance operation. It will replace a substantial fraction of the radio-frequency power systems (gridded tubes and klystrons) with modern systems, completely refurbish the original accelerator control and timing systems, replace obsolete diagnostic devices, and modernize other ancillary systems. An overview of the LANSCE-R project will be presented. The functional and operating requirements will be discussed, the proposed technical solutions presented, and the plan for successful project execution while meeting annual customer expectations for beam delivery will be reviewed.

  2. Los Alamos National Laboratory Yucca Mountain Site Characterization Project 1994 quality program status report

    Energy Technology Data Exchange (ETDEWEB)

    Bolivar, S.L.

    1996-03-01

    This status report is for calendar year 1994. It summarizes the annual activities and accomplishments of the Los Alamos National Laboratory Yucca Mountain Site Characterization Project (YMP or Project) quality assurance program. By identifying the accomplishments of the quality program, a baseline is established that will assist in decision making, improve administrative controls and predictability, and allow us to annually identify adverse trends and to evaluate improvements. This is the fourth annual status report.

  3. Los Alamos National Laboratory Yucca Mountain Site Characterization Project 1994 quality program status report

    International Nuclear Information System (INIS)

    Bolivar, S.L.

    1996-03-01

    This status report is for calendar year 1994. It summarizes the annual activities and accomplishments of the Los Alamos National Laboratory Yucca Mountain Site Characterization Project (YMP or Project) quality assurance program. By identifying the accomplishments of the quality program, a baseline is established that will assist in decision making, improve administrative controls and predictability, and allow us to annually identify adverse trends and to evaluate improvements. This is the fourth annual status report

  4. Quarterly report of RCRA groundwater monitoring data for period April 1, 1993 through June 30, 1993

    Energy Technology Data Exchange (ETDEWEB)

    Jungers, D.K.

    1993-10-01

    Hanford Site interim-status groundwater monitoring projects are conducted as either background, indicator parameter evaluation, or groundwater quality assessment monitoring programs. This report contains data from Hanford Site groundwater monitoring projects. Westinghouse Hanford Company (WHC) manages the RCRA groundwater monitoring projects for federal facilities on the Hanford Site. Project management, specifying data needs, performing quality control (QC) oversight, managing data, and preparing project sampling schedules are all parts of this responsibility. Pacific Northwest Laboratory (PNL) administers the contract for analytical services and provides groundwater sampling services to WHC for the RCRA groundwater monitoring program. This quarterly report contains data received between May 24 and August 20, 1993, which are the cutoff dates for this reporting period. This report may contain not only data from samples collected during the April through June quarter but also data from earlier sampling events that were not previously reported.

  5. Quarterly environmental radiological survey summary: 100, 200, 300 and 600 Areas. Fourth quarter 1994

    International Nuclear Information System (INIS)

    McKinney, S.M.

    1995-01-01

    This report provides a summary of the radiological surveys performed on waste disposal sites located at the Hanford Site. The Fourth Quarter 1994 survey results and the status of actions required from current and past reports are summarized

  6. Progress, status, and plans for the HRIBF project

    International Nuclear Information System (INIS)

    Auble, R.L.; Alton, G.D.; Bailey, J.D.

    1995-01-01

    Over the last three years, the Holifield accelerator system has been reconfigured into a first-generation radioactive ion beam facility, the HRIBF, a national user facility for RIB research. The construction and reconfiguration have been completed and the equipment commissioning and beam development phases have started. The progress to date, the present status, and future plans will be given. The special problems connected with the production and acceleration of RIBs will be discussed

  7. Status of the Forward Physics Projects in ATLAS

    OpenAIRE

    Ask, Stefan

    2007-01-01

    The ATLAS experiment at the LHC is building several detector systems for forward physics studies and to determine the luminosity. The main forward systems consist of a Cerenkov detector called LUCID, a Zero Degree Calorimeter (ZDC) and Roman Pots which will house a scintillating fiber tracker system called ALFA. Here we report some of the forward physics activities that are foreseen in ATLAS together with the status of the related detector systems.

  8. Project SQUID: Quarterly Progress Report

    Science.gov (United States)

    1950-07-01

    JET ENGINES. ( HYU -eÄl) Submitted by» J» Lemeleon^ New York University, No data on the operations of the glass-walled pulse jet have been...It is felt at HYU that a better understanding of the rela- tively simple phenomenon of the Rijke tube is, therefore, essential before headway...tnd combustion, KYTJ-7R6. Lerge amplitude ges vibration theory 19 HyU -7R7. Photo-ignition 1.4 NYU-7R8. Hydrocorbon Fleme Bends 67 i NYU

  9. Wind/photovoltaic power indicators. Second quarter 2009

    International Nuclear Information System (INIS)

    2009-09-01

    This document makes a quarterly status of the power generation from wind and photovoltaic power plants connected to the French grid (continental France, Corsica and overseas territories): total connected load, quarterly connected load during the last years, power generated since the beginning of the year, progress trend of wind and photovoltaic power in France, regional status. (J.S.)

  10. Wind/photovoltaic power indicators. Second quarter 2011

    International Nuclear Information System (INIS)

    2011-01-01

    This document makes a quarterly status of the power generation from wind and photovoltaic power plants connected to the French grid (continental France, Corsica and overseas territories): total connected load, quarterly connected load during the last years, power generated since the beginning of the year, progress trend of wind and photovoltaic power in France, regional status. (J.S.)

  11. Wind/photovoltaic power indicators. First quarter 2010

    International Nuclear Information System (INIS)

    2010-01-01

    This document makes a quarterly status of the power generation from wind and photovoltaic power plants connected to the French grid (continental France, Corsica and overseas territories): total connected load, quarterly connected load during the last years, power generated since the beginning of the year, progress trend of wind and photovoltaic power in France, regional status. (J.S.)

  12. Wind/photovoltaic power indicators. Second quarter 2010

    International Nuclear Information System (INIS)

    2010-01-01

    This document makes a quarterly status of the power generation from wind and photovoltaic power plants connected to the French grid (continental France, Corsica and overseas territories): total connected load, quarterly connected load during the last years, power generated since the beginning of the year, progress trend of wind and photovoltaic power in France, regional status. (J.S.)

  13. Wind/photovoltaic power indicators. Fourth quarter 2010

    International Nuclear Information System (INIS)

    2011-01-01

    This document makes a quarterly status of the power generation from wind and photovoltaic power plants connected to the French grid (continental France, Corsica and overseas territories): total connected load, quarterly connected load during the last years, power generated since the beginning of the year, progress trend of wind and photovoltaic power in France, regional status. (J.S.)

  14. Wind/photovoltaic power indicators. First quarter 2011

    International Nuclear Information System (INIS)

    2011-01-01

    This document makes a quarterly status of the power generation from wind and photovoltaic power plants connected to the French grid (continental France, Corsica and overseas territories): total connected load, quarterly connected load during the last years, power generated since the beginning of the year, progress trend of wind and photovoltaic power in France, regional status. (J.S.)

  15. Wind/photovoltaic power indicators. Third quarter 2009

    International Nuclear Information System (INIS)

    2009-11-01

    This document makes a quarterly status of the power generation from wind and photovoltaic power plants connected to the French grid (continental France, Corsica and overseas territories): total connected load, quarterly connected load during the last years, power generated since the beginning of the year, progress trend of wind and photovoltaic power in France, regional status. (J.S.)

  16. Wind/photovoltaic power indicators. Fourth quarter 2009

    International Nuclear Information System (INIS)

    2010-02-01

    This document makes a quarterly status of the power generation from wind and photovoltaic power plants connected to the French grid (continental France, Corsica and overseas territories): total connected load, quarterly connected load during the last years, power generated since the beginning of the year, progress trend of wind and photovoltaic power in France, regional status. (J.S.)

  17. Wind/photovoltaic power indicators. Third quarter 2010

    International Nuclear Information System (INIS)

    2010-01-01

    This document makes a quarterly status of the power generation from wind and photovoltaic power plants connected to the French grid (continental France, Corsica and overseas territories): total connected load, quarterly connected load during the last years, power generated since the beginning of the year, progress trend of wind and photovoltaic power in France, regional status. (J.S.)

  18. Commercial Supersonics Technology Project - Status of Airport Noise

    Science.gov (United States)

    Bridges, James

    2016-01-01

    The Commercial Supersonic Technology Project has been developing databases, computational tools, and system models to prepare for a level 1 milestone, the Low Noise Propulsion Tech Challenge, to be delivered Sept 2016. Steps taken to prepare for the final validation test are given, including system analysis, code validation, and risk reduction testing.

  19. The EFF project status and the NEA nuclear data services

    Energy Technology Data Exchange (ETDEWEB)

    Henriksson, H. [OECD Nuclear Energy Agency, 12 Blvd des Iles, 92130 Issy-les-Moulineaux (France)], E-mail: henriksson@nea.fr; Batistoni, P. [Associazione Euratom-ENEA sulla Fusione, Via E. Fermi 45, 00044 Frascati (Italy); Fischer, U. [Association FZK-Euratom, Postfach 3640, 76021 Karlsruhe (Germany); Forrest, R. [Euratom/UKAEA Fusion Association, Culham Science Centre, Oxfordshire OX14 3DB (United Kingdom); Kodeli, I.; Nordborg, C. [OECD Nuclear Energy Agency, 12 Blvd des Iles, 92130 Issy-les-Moulineaux (France)

    2007-10-15

    The OECD Nuclear Energy Agency (NEA) Data Bank participates in the production of data and their distribution to users including the collection and validation as well as the distribution of the Joint Evaluated Fission and Fusion (JEFF) library. The JEFF project has evolved from two separate projects, namely the European Fusion File (EFF) and the Joint Evaluated File (JEF), with the release of JEFF-3.1, in May 2005. The NEA also provides tools for the EFF project, such as computer codes for nuclear energy and radiation physics applications. Of special interest for fusion applications are the integral experiments collected in the SINBAD database, with radiation shielding and dosimetry experiments including many fusion neutronics shielding experiments. In this paper an overview will be given of the NEA, and some examples of nuclear data services offered, such as the SINBAD database. JANIS, a display program evaluated and experimental data developed at the NEA will be mentioned briefly. The main emphasis will be given to the EFF project including the contents of the new JEFF-3.1 library, released in May 2005. Examples of recent work are given as well as a discussion on the forth-coming evaluation efforts among the EFF collaborators.

  20. The EFF project status and the NEA nuclear data services

    International Nuclear Information System (INIS)

    Henriksson, H.; Batistoni, P.; Fischer, U.; Forrest, R.; Kodeli, I.; Nordborg, C.

    2007-01-01

    The OECD Nuclear Energy Agency (NEA) Data Bank participates in the production of data and their distribution to users including the collection and validation as well as the distribution of the Joint Evaluated Fission and Fusion (JEFF) library. The JEFF project has evolved from two separate projects, namely the European Fusion File (EFF) and the Joint Evaluated File (JEF), with the release of JEFF-3.1, in May 2005. The NEA also provides tools for the EFF project, such as computer codes for nuclear energy and radiation physics applications. Of special interest for fusion applications are the integral experiments collected in the SINBAD database, with radiation shielding and dosimetry experiments including many fusion neutronics shielding experiments. In this paper an overview will be given of the NEA, and some examples of nuclear data services offered, such as the SINBAD database. JANIS, a display program evaluated and experimental data developed at the NEA will be mentioned briefly. The main emphasis will be given to the EFF project including the contents of the new JEFF-3.1 library, released in May 2005. Examples of recent work are given as well as a discussion on the forth-coming evaluation efforts among the EFF collaborators

  1. Present status and future development of Qinshan nuclear power project

    International Nuclear Information System (INIS)

    Ouyang Yu

    1987-01-01

    Qinshan 300 MWe Nuclear power Project is the first domestically designed and constructed nuclear power plant in China. Here is a brief description of its progress in design work, equipment manufacture and site construction since the first structural concrete in March 1985. In Qinshan area four units of 600 MWe each are planned to be built with collaboration of proper foreign partners. (author)

  2. The Eurodif program. Present status of the project

    International Nuclear Information System (INIS)

    Besse, G.

    1975-01-01

    The reasons which led Eurodif to decide for the gaseous diffusion process and the benefits which such process offers for the present time are presented. The realization of the Eurodif project (description of the plant, time schedule of the realization, electric power supply, production time-schedule) is discussed. The Eurodif marketing policy, present and future, is reported [fr

  3. RIKEN radioactive isotope beam factory project – Present status and ...

    Indian Academy of Sciences (India)

    Programs for studying nuclear reactions and structure of exotic nuclei available at the RIKEN radioactive isotope beam factory project are introduced and discussed by demonstrating recent highlights. Special emphasis ... RIKEN Nishina Center for Accelerator-Based Science, 2-1 Hirosawa, Wako, Saitama 351-0198, Japan ...

  4. Design status of the Delfi-Next nanosatellite project

    NARCIS (Netherlands)

    Bouwmeester, J.; Brouwer, G.F.; Gill, E.K.A.; Monna, G.L.E.; Rotteveel, J.

    2010-01-01

    Delfi-Next is the second project within the Delfi nanosatellite development program of Delft University of Technology. It will provide students hands-on experience, facilitate technology demonstration for innovative miniaturized space technology from the Dutch space sector and allow advancements in

  5. Status and further plans for the Halden project MMS activities

    International Nuclear Information System (INIS)

    Oewre, Fridtjov

    2004-01-01

    The Halden Reactor Project is a joint undertaking of nuclear organizations in 19 countries sponsoring a jointly financed research programme under the auspices of the OECD NEA. The programme is renewed every third year. The three main research areas at the Halden Project are: Fuels-, Materials- and Man-Machine Systems (MMS) research. The MMS research addresses issues related to human-machine interaction in computerized control rooms as well as the development and test of new technology related to safe and reliable operation of nuclear power plants. The MMS research at the Halden Project is closely tied with experimental work in two laboratories constituting what is now called the MTO-labs (MTO=Man-Technology-Organization). The new MTO-lab building was opened in the spring 2004. One of the laboratories is the nuclear simulator-based Halden Man-Machine Laboratory (HAMMLAB). The other laboratory is called the Halden Virtual Reality Centre (HVRC). The paper first introduces the new MTO-lab and outlines Halden's capabilities of perform MMS research. Furthermore the paper discusses three selected topics addressed within the current Halden MMS programme focusing on our approach to obtain data for human reliability assessment, the work on design and evaluation of innovative human system interfaces and our work on integrated wearable computing technologies for field operators. A short overview of our plans for future research as part of the international Halden Reactor Project concludes the paper. (author)

  6. Present status and plans of JENDL FP data evaluation project

    International Nuclear Information System (INIS)

    Kawano, Toshihiko

    2003-01-01

    The Fission Product (FP) data evaluation is one of the key issues for the next revision of JENDL, since many data were carried over from JENDL-3.2 to 3.3. The new FP Working Group (FPWG) was organized in the Japanese Nuclear Data Committee (JNDC) to perform new evaluations of FP data for JENDL. In the present review of FP data evaluation, we show the history and current status of FP nuclear data, requirements of FP data, new measurements, the international cooperation, and the future plans toward the new JENDL. (author)

  7. Los Alamos National Laboratory Yucca Mountain Site Characterization Project 1995 quality program status report

    Energy Technology Data Exchange (ETDEWEB)

    Bolivar, S.L.

    1996-07-01

    This status report summarizes the activities and accomplishments of the Los Alamos National Laboratory Yucca Mountain Site Characterization Project`s (YMP`s) quality assurance program for January 1 to September 30, 1995. The report includes major sections on program activities and trend analysis.

  8. Status of the ATLAS Positive-Ion Injector Project

    International Nuclear Information System (INIS)

    Pardo, R.C.; Benaroya, R.; Billquist, P.J.

    1987-01-01

    The goal of the Argonne Positive Ion Injector project is to replace the ATLAS tandem injector with a facility which will increase the beam currents presently available by a factor of 100 and to make available at ATLAS essentially all beams including uranium. The beam quality expected from the facility will be at least as good as that of the tandem based ATLAS. The project combines two relatively new technologies - the electron cyclotron resonance ion source, which provides high charge state ions at microampere currents, and RF superconductivity which has been shown to be capable of generating accelerating fields as high as 10 MV/m, resulting in an essentially new method of acceleration for low-energy heavy ions. 5 refs., 7 figs., 1 tabs

  9. About Nano-JASMINE Satellite System and Project Status

    Science.gov (United States)

    Sako, Nobutada

    Intelligent Space Systems Laboratory, The University of Tokyo (ISSL) and National Astronomical Observatory of Japan (NAO) have been developing a small infrared astrometry satellite named “Nano-JASMINE”. The satellite size is about 50cm cubic and 20kg, which plays a pre-cursor role of JASMINE Project which is programmed by NAO and JAXA. In addition, since there has been only one astrometry satellite HIPPARCOS by ESA in the past, Nano-JASMINE is also expected to achieve certain scientific results in the field of astrometry. In this project, ISSL aims to develop new advanced small satellite bus system whose performance is comparable to that of 100-500kg sized satellites, including attitude stability of 1 arc-second and thermal stability of the mission subsystem of 1 mK. This paper overviews the Nano-JASMINE bus system with emphasis on attitude and thermal control systems.

  10. Next Generation Nuclear Plant Project 2009 Status Report

    Energy Technology Data Exchange (ETDEWEB)

    Larry Demick; Jim Kinsey; Keith Perry; Dave Petti

    2010-05-01

    The mission of the NGNP Project is to broaden the environmental and economic benefits of nuclear energy technology to the United States and other economies by demonstrating its applicability to market sectors not served by light water reactors (LWRs). Those markets typically use fossil fuels to fulfill their energy needs, and high temperature gas-cooled reactors (HTGRs) like the NGNP can reduce this dependence and the resulting carbon footprint.

  11. Total and Spectral Solar Irradiance Sensor (TSIS) Project Status

    Science.gov (United States)

    Carlisle, Candace

    2018-01-01

    TSIS-1 studies the Sun's energy input to Earth and how solar variability affects climate. TSIS-1 will measure both the total amount of light that falls on Earth, known as the total solar irradiance (TSI), and how that light is distributed among ultraviolet, visible and infrared wavelengths, called solar spectral irradiance (SSI). TSIS-1 will provide the most accurate measurements of sunlight and continue the long-term climate data record. TSIS-1 includes two instruments: the Total Irradiance Monitor (TIM) and the Spectral Irradiance Monitor (SIM), integrated into a single payload on the International Space Station (ISS). The TSIS-1 TIM and SIM instruments are upgraded versions of the two instruments that are flying on the Solar Radiation and Climate Experiment (SORCE) mission launched in January 2003. NASA Goddard's TSIS project responsibilities include project management, system engineering, safety and mission assurance, and engineering oversight for TSIS-1. TSIS-1 was installed on the International Space Station in December 2017. At the end of the 90-day commissioning phase, responsibility for TSIS-1 operations transitions to the Earth Science Mission Operations (ESMO) project at Goddard for its 5-year operations. NASA contracts with the University of Colorado Laboratory for Atmospheric and Space Physics (LASP) for the design, development and testing of TSIS-1, support for ISS integration, science operations of the TSIS-1 instrument, data processing, data evaluation, calibration and delivery to the Goddard Earth Science Data and Information Services Center (GES DISC).

  12. Status of the Munich compact core reactor project

    International Nuclear Information System (INIS)

    Boening, K.; Glaeser, W.; Meier, J.; Rau, G.; Roehrmoser, A.; Steichele, E.

    1991-01-01

    A new national, high performance research reactor is being planned in Munich which shall provide an unperturbed thermal neutron flux of about 8.10 14 cm -2 s -1 at only 20 MW power. This object can be achieved with the concept of a small, light water cooled 'compact core' situated in the center of a large heavy water moderator tank. In the first part of this paper an overview is given on the status of the necessary fuel enrichment is discussed. In becomes clear that the potential of the compact core concept can only be developed without compromises when using highly enriched uranium in combination with the new high density fuel. (orig.)

  13. Status and outlook of the CRYRING@ESR project

    Energy Technology Data Exchange (ETDEWEB)

    Geithner, W., E-mail: w.geithner@gsi.de; Andelkovic, Z.; Beck, D.; Bräuning, H.; Bräuning-Demian, A. [GSI Helmholtzzentrum für Schwerionenforschung (Germany); Danared, H. [European Spallation Source ESS (Sweden); Dimopoulou, C. [GSI Helmholtzzentrum für Schwerionenforschung (Germany); Engström, M. [Fysikum, Stockholm University (Sweden); Fedotova, S.; Gorda, O.; Herfurth, F.; Hess, R. [GSI Helmholtzzentrum für Schwerionenforschung (Germany); Källberg, A. [Fysikum, Stockholm University (Sweden); Kleffner, C.; Kotovskiy, N.; Kraus, I.; Lestinsky, M.; Litvinov, S.; Nolden, F.; Reiter, A. [GSI Helmholtzzentrum für Schwerionenforschung (Germany); and others

    2017-11-15

    Once operational, CRYRING@ESR will store and decelerate ions delivered by the experimental storage ring ESR at energies well below those of ESR. In addition to that, CRYRING@ESR has an electron cooler operating with an ultracold electron beam, allowing to provide cooled ion beams for precision experiments. These ions will be delivered to a broad range of experiments presently in preparation; either in-ring or extracted to a dedicated beamline for experiments. An overview and status report of the installation and commissioning of the CRYRING-@ESR storage ring for highly charged ions at the GSI Helmholtzzentrum für Schwerionenforschung is presented. The installation of this storage ring started in 2014 and was completing end of 2016, when this publication was written.

  14. Status of the Dark Energy Survey Camera (DECam) Project

    Energy Technology Data Exchange (ETDEWEB)

    Flaugher, Brenna L.; Abbott, Timothy M.C.; Angstadt, Robert; Annis, Jim; Antonik, Michelle, L.; Bailey, Jim; Ballester, Otger.; Bernstein, Joseph P.; Bernstein, Rebbeca; Bonati, Marco; Bremer, Gale; /Fermilab /Cerro-Tololo InterAmerican Obs. /ANL /Texas A-M /Michigan U. /Illinois U., Urbana /Ohio State U. /University Coll. London /LBNL /SLAC /IFAE

    2012-06-29

    The Dark Energy Survey Collaboration has completed construction of the Dark Energy Camera (DECam), a 3 square degree, 570 Megapixel CCD camera which will be mounted on the Blanco 4-meter telescope at CTIO. DECam will be used to perform the 5000 sq. deg. Dark Energy Survey with 30% of the telescope time over a 5 year period. During the remainder of the time, and after the survey, DECam will be available as a community instrument. All components of DECam have been shipped to Chile and post-shipping checkout finished in Jan. 2012. Installation is in progress. A summary of lessons learned and an update of the performance of DECam and the status of the DECam installation and commissioning will be presented.

  15. Status of the Dark Energy Survey Camera (DECam) project

    Energy Technology Data Exchange (ETDEWEB)

    Flaugher, Brenna L.; McLean, Ian S.; Ramsay, Suzanne K.; Abbott, Timothy M. C.; Angstadt, Robert; Takami, Hideki; Annis, Jim; Antonik, Michelle L.; Bailey, Jim; Ballester, Otger; Bernstein, Joseph P.; Bernstein, Rebecca A.; Bonati, Marco; Bremer, Gale; Briones, Jorge; Brooks, David; Buckley-Geer, Elizabeth J.; Campa, Juila; Cardiel-Sas, Laia; Castander, Francisco; Castilla, Javier; Cease, Herman; Chappa, Steve; Chi, Edward C.; da Costa, Luis; DePoy, Darren L.; Derylo, Gregory; de Vincente, Juan; Diehl, H. Thomas; Doel, Peter; Estrada, Juan; Eiting, Jacob; Elliott, Anne E.; Finley, David A.; Flores, Rolando; Frieman, Josh; Gaztanaga, Enrique; Gerdes, David; Gladders, Mike; Guarino, V.; Gutierrez, G.; Grudzinski, Jim; Hanlon, Bill; Hao, Jiangang; Holland, Steve; Honscheid, Klaus; Huffman, Dave; Jackson, Cheryl; Jonas, Michelle; Karliner, Inga; Kau, Daekwang; Kent, Steve; Kozlovsky, Mark; Krempetz, Kurt; Krider, John; Kubik, Donna; Kuehn, Kyler; Kuhlmann, Steve E.; Kuk, Kevin; Lahav, Ofer; Langellier, Nick; Lathrop, Andrew; Lewis, Peter M.; Lin, Huan; Lorenzon, Wolfgang; Martinez, Gustavo; McKay, Timothy; Merritt, Wyatt; Meyer, Mark; Miquel, Ramon; Morgan, Jim; Moore, Peter; Moore, Todd; Neilsen, Eric; Nord, Brian; Ogando, Ricardo; Olson, Jamieson; Patton, Kenneth; Peoples, John; Plazas, Andres; Qian, Tao; Roe, Natalie; Roodman, Aaron; Rossetto, B.; Sanchez, E.; Soares-Santos, Marcelle; Scarpine, Vic; Schalk, Terry; Schindler, Rafe; Schmidt, Ricardo; Schmitt, Richard; Schubnell, Mike; Schultz, Kenneth; Selen, M.; Serrano, Santiago; Shaw, Terri; Simaitis, Vaidas; Slaughter, Jean; Smith, R. Christopher; Spinka, Hal; Stefanik, Andy; Stuermer, Walter; Sypniewski, Adam; Talaga, R.; Tarle, Greg; Thaler, Jon; Tucker, Doug; Walker, Alistair R.; Weaverdyck, Curtis; Wester, William; Woods, Robert J.; Worswick, Sue; Zhao, Allen

    2012-09-24

    The Dark Energy Survey Collaboration has completed construction of the Dark Energy Camera (DECam), a 3 square degree, 570 Megapixel CCD camera which will be mounted on the Blanco 4-meter telescope at CTIO. DECam will be used to perform the 5000 sq. deg. Dark Energy Survey with 30% of the telescope time over a 5 year period. During the remainder of the time, and after the survey, DECam will be available as a community instrument. All components of DECam have been shipped to Chile and post-shipping checkout finished in Jan. 2012. Installation is in progress. A summary of lessons learned and an update of the performance of DECam and the status of the DECam installation and commissioning will be presented.

  16. The SuperB factory, physics potential and project status

    Directory of Open Access Journals (Sweden)

    Wiechczynski Jaroslaw

    2012-12-01

    Full Text Available The SuperB project is an international enterprise aiming at the construction of the high-luminosity asymmetric beam energy electron-positron accelerator, which would be located in the area of Rome. It would exploit several novel features allowing to achieve an unprecedented luminosities and to collect almost a hundred times more data than the current generation of ”B factories”. As for the leptonic colliders, it will maintain a clean, low-background experimental environment that is crucial for numerous measurements on the field of high energy physics

  17. TA 55 Reinvestment Project II Phase C Update Project Status May 23, 2017

    Energy Technology Data Exchange (ETDEWEB)

    Giordano, Anthony P. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2017-05-25

    The TA-55 Reinvestment Project (TRP) II Phase C is a critical infrastructure project focused on improving safety and reliability of the Los Alamos National Laboratory (LANL) TA-55 Complex. The Project recapitalizes and revitalizes aging and obsolete facility and safety systems providing a sustainable nuclear facility for National Security Missions.

  18. The PALLAS research and isotope reactor project status

    International Nuclear Information System (INIS)

    Van Der Schaaf, B.; De Jong, P.

    2010-01-01

    In the European Union the first generation research reactors is nearing their end of life condition. Several committees recommend a comprehensive set of reactors in the EU, amongst them the replacement for the HFR research and isotope reactor in Petten: PALLAS. The business case for PALLAS supports a future for a research and isotope reactor in Petten as a perfect fit for the future EU set of test reactors. The tender for PALLAS started in 2007, following the EU rules for tendering complex objects with the competitive dialogue. This procedure involved an extensive consultation phase between individual tendering companies and NRG, resulting in definitive specifications in summer 2008. The evaluation of offers, including conceptual designs, took place in summer 2009. At present NRG is still active in the acquisition of the funding for the project. The licensing path has been started in autumn 2009 with a initiation note on the environmental impact assessment, EIA. The public hearings held in the lead to the advice from the national EIA committee for the approach of the assessment. The PALLAS project team in Petten will guide the design and build processes. It is also responsible for the licensing of the building and operation of PALLAS. The team also manages the design and construction for the infrastructure, such as cooling devices, including remnant heat utilization, and utility provisions. A particular responsibility for the team is the design and construction of experimental and isotope capsules, based on launch customer requirements. (author)

  19. DELSY project: status and development Dubna Electron Synchrotron

    CERN Document Server

    Balalykin, N; Bykovsky, V

    2003-01-01

    The DELSY (Dubna Electron Synchrotron) project is under development at the Joint Institute for Nuclear Research. It is based on an acceleration facility donated to the Joint Institute for Nuclear Research by the Institute for Nuclear and High Energy Physics (NIKHEF, Amsterdam). The NIKHEF accelerator facility consists of the linear electron accelerator MEA, which has an electron energy of 700 MeV, and the electron storage ring AmPS, with a maximum energy of 900 MeV and a beam current of 200 mA. There are three phases to the construction of the DELSY facility. Phase I will be accomplished with the construction of a complex of free-electron lasers covering continuously the spectrum from the far infrared down to the ultraviolet (approx 150 nm). Phase II will be accomplished with the commissioning of the storage ring DELSY. Complete commissioning of the DELSY project will take place after finishing Phase III, the construction of an X-ray free-electron laser. This phase is considered as the ultimate goal of the pr...

  20. Present status of some technological activities supporting the MOLCARE project

    Energy Technology Data Exchange (ETDEWEB)

    Torazza, A. [Ansaldo Ricerche S.r.l., Genova (Italy); Rocchini, G. [ENEL, Milano (Italy); Scagliotti, M. [CISE, Milano (Italy)

    1996-12-31

    The development of MCFC stack technology is carried out at Ansaldo Ricerche in the framework of the MOLCARE project, a cooperation with Spanish companies under a partial UE funding, while a specific research program concerning the physico-chemical characterization of materials is performed jointly by CISE and ENEL. The project includes the development, the construction and the testing of a full scale 100 kW prototype, the assessment of stack technology on subscale stacks, the mathematical modelling of the MCFC based plants and the basic researches. The aim of the basic researches, carried out on single cells, is to improve the effectiveness and durability of both the active and the hardware materials. The Ansaldo stack technology is based on external manifolding. The full scale 100 kW prototype will be integrated with the sensible heat reformer and other ancillary equipments according to the {open_quote}Compact Unit (CU){close_quotes} concept. These technical choices stress requirements for manifold gasket configuration. electrolyte migration control, {Delta}p management and porous component compaction.

  1. Status of the object-oriented EGS interface project

    International Nuclear Information System (INIS)

    Yacout, A.M.; Dunn, W.L.; Nelson, W.R.; Lui, P.; Bielajew, A.F.; Hirayama, H.; Namito, Y.

    2000-01-01

    The object-oriented EGS interface project seeks to simplify - using modern object-oriented and visual user interface techniques - the geometry and scoring aspects of the process of running the EGS code. The project will create an extremely user-friendly EGS package that retains and exploits the well documented physics advantages of EGS but removes the requirement that the user write HOWFAR and AUSGAB subroutines to define the geometry and scoring aspects of each new problem. In addition, several physics enhancements will be incorporated in EGS5. Although EGS5 will be able to be used in the traditional way - in a stand-alone fashion with users writing their own geometry and scoring subroutines - it is designed to be used in a completely new way - linked to a user interface through which users can manage all aspects of problem specification and code operation. This paper concentrates on the object-oriented user interface, which will dramatically simplify defining problem-specific detail for EGS. The 'EGS5 + VUI1' package will allow users to solve independent problems by run-time linking of the EGS5 code with class libraries that encapsulate the geometry and scoring aspects of each problem. Some simple example problems are considered in order to illustrate features of the EGS5 + VUI1 package. (author)

  2. Contracts for field projects and supporting research on enhanced oil recovery, October--December 1992. Progress review No. 73, quarter ending December 31, 1992

    Energy Technology Data Exchange (ETDEWEB)

    1993-12-01

    Accomplishments for this quarter ending December 31, 1992 are presented for the following tasks: chemical flooding--supporting research; gas displacement--supporting research; thermal recovery--supporting research; geoscience technology; resource assessment technology; microbial technology; reservoir classes; and novel technology.

  3. Contracts for field projects and supporting research on enhanced oil recovery, July--September 1992. Progress review No. 72, quarter ending September 30, 1992

    Energy Technology Data Exchange (ETDEWEB)

    1993-09-01

    Accomplishments for the past quarter are presented for the following tasks: Chemical flooding--supporting research; gas displacement--supporting research; thermal recovery--supporting research; geoscience technology; resource assessment technology; microbial technology; and novel technology. A list of available publication is also provided.

  4. Quarterly report of RCRA groundwater monitoring data for period January 1, 1993 through March 31, 1993

    Energy Technology Data Exchange (ETDEWEB)

    1993-07-01

    Hanford Site interim-status groundwater monitoring projects are conducted as either background, indicator parameter evaluation, or groundwater quality assessment monitoring programs as defined in the Resource Conservation and Recovery Act of 1976 (RCRA); and Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities, as amended (40 Code of Federal Regulations [CFR] 265). Compliance with the 40 CFR 265 regulations is required by the Washington Administrative Code (WAC) 173-303. This report contains data from Hanford Site groundwater monitoring projects. This quarterly report contains data received between March 8 and May 24, 1993, which are the cutoff dates for this reporting period. This report may contain not only data from the January through March quarter but also data from earlier sampling events that were not previously reported.

  5. A status report on the PBFA II construction project

    International Nuclear Information System (INIS)

    Barr, G.W.; Furaus, J.P.; Cook, D.L.; Shirley, C.G.

    1985-01-01

    The Particle Beam Fusion Accelerator II (PBFA II) is under construction at Sandia National Laboratories (SNL). PBFA II contains 36 individual power modules configured in a stacked radial geometry and synchronized to provide greater than 3.5 MJ of energy into the vacuum section in a single 55-ns-wide 90-TW peak power pulse. This R and D construction project is being implemented in a fast track schedule mode in which final design of the accelerator components occurs in parallel with the construction of the laboratory building and the accelerator tank. PBFA II is scheduled to become operational in January 1986 with its first multi-module shot into an applied-B ion diode that will generate and transport a beam of lithium ions. Plans are now being made for experimental work on PBFA II beyond the construction phase

  6. Status report on the Star Fire railgun development project

    International Nuclear Information System (INIS)

    Hawke, R.S.; Asay, J.R.

    1988-01-01

    The Star Fire Project is a joint SNLA/LLNL effort to develop a combined two-stage light-gas gun (2SLGG) and railgun into a three-stage hypervelocity launcher for equation-of-state (EOS) research. The 2SLGG is used to accelerate a projectile to a velocity of 6-9 km/s. The railgun serves as the third stage to further accelerate the projectile. The high injection velocity will minimize barrel ablation and armature contamination. Hydrogen is used as the injection gas and serves to reduce the probability of forming secondary arcs. VISAR is used for continuous precision projectile velocity measurement. This paper discusses the results of armature formation tests, the use of the railgun stage to increase projectile velocity, and armature diagnostic measurements

  7. The DIII-D Radiative Divertor Project: Status and plans

    International Nuclear Information System (INIS)

    Smith, J.P.; Baxi, C.B.; Bozek, A.S.

    1996-10-01

    New divertor hardware is being designed and fabricated for the Radiative Divertor modification of the DIII-D tokamak. The installation of the hardware has been separated into two phases, the first phase starting in October of 1996 and the second and final phase, in 1998. The phased approach enables the continuation of the divertor characterization research in the lower divertor while providing pumping for density control in high triangularity, single- or double-null advanced tokamak discharges. When completed, the Radiative Divertor Project hardware will provide pumping at all four strike points of a double-null, high triangularity discharge and provide baffling of the neutral particles from transport back to the core plasma. By puffing neutral gas into the divertor region, a reduction in the heat flux on the target plates will be be demonstrated without a large rise in core density. This reduction in heat flux is accomplished by dispersing the power with radiation in the divertor region. Experiments and modeling have formed the basis for the new design. The capability of the DIII-D cryogenic system is being upgraded as part of this project. The increased capability of the cryogenic system will allow delivery of liquid helium and nitrogen to three new cryopumps. Physics studies on the effects of slot width and length can be accomplished easily with the design of the Radiative Divertor. The slot width can be varied by installing graphite tiles of different geometry. The change in slot length, the distance from the X-point to the target plate, requires relocating the structure vertically and can be completed in about 6-8 weeks. Radiative Divertor diagnostics are being designed to provide comprehensive measurements for diagnosing the divertor. Required diagnostic modifications will be minimal for Phase 1, but extensive for Phase 2 installation. These Phase 2 diagnostics will be required to fully diagnose the high triangularity discharges in the divertor slots

  8. Status of project design work for a German reprocessing plant

    International Nuclear Information System (INIS)

    Lang, K.; Zuehlke, P.

    1976-01-01

    A reprocessing plant will be built within the framework of a comprehensive waste management center planned by the Federal Government to treat the fuel elements unloaded from German nuclear power stations. On the basis of an annual throughput of 1,400 te of uranium averaged over the life of the plant, the center will be able to serve between 45,000 and 50,000 MWe of installed nuclear generating capacity. A comprehensive conceptual design study of the reprocessing plant to be built has been completed on the basis of the operating experience accumulated at the Karlsruhe reprocessing plant and the development work carried out by the Karlsruhe Nuclear Research Center and in the light also of an intensive exchange of experience with British and French reprocessing companies within the framework of United Reprocessors GmbH. This conceptual design study is the foundation for the preliminary project to be carried out on a collaborative basis by KEWA and PWK. (orig.) [de

  9. Yucca Mountain Site Characterization Project exploratory studies facilities construction status

    International Nuclear Information System (INIS)

    Allan, J.N.; Leonard, T.M.

    1993-01-01

    This paper discusses the progress to date on the construction planning and development of the Yucca Mountain Site Characterization Project (YMP) Exploratory Studies Facilities (ESF). The purpose of the ESF is to determine early site suitability and to characterize the subsurface of the Yucca Mountain site to assess its suitability for a potential high level nuclear waste repository. The present ESF configuration concept is for two main ramps to be excavated by tunnel boring machines (TBM) from the surface to the Topopah Spring Member of the Paintbrush Tuff Formation. From the main ramps, slightly above Topopah Spring level, supplemental ramps will be penetrated to the Calico Hills formation below the potential repository. There will be exploratory development drifts driven on both levels with the Main Test Area being located on the Topopah Spring level, which is the level of the proposed repository. The Calico Hills formation lies below the Topopah Spring member and is expected to provide the main geo-hydrologic barrier between the potential repository and the underlying saturated zones in the Crater Flat Tuff

  10. NREL Solar Radiation Resource Assessment Project: Status and outlook

    Science.gov (United States)

    Renne, D.; Riordan, C.; Maxwell, E.; Stoffel, T.; Marion, B.; Rymes, M.; Wilcox, S.; Myers, D.

    1992-05-01

    This report summarizes the activities and accomplishments of NREL's Solar Radiation Resource Assessment Project during fiscal year 1991. Currently, the primary focus of the SRRAP is to produce a 1961 - 1990 National Solar Radiation Data Base, providing hourly values of global horizontal, diffuse, and direct normal solar radiation at approximately 250 sites around the United States. Because these solar radiation quantities were measured intermittently at only about 50 of these sites, models were developed and applied to the majority of the stations to provide estimates of these parameters. Although approximately 93 percent of the data base consists of modeled data this represents a significant improvement over the SOLMET/ERSATZ 1952 - 1975 data base. The magnitude and importance of this activity are such that the majority of SRRAP human and financial resources were devoted to the data base development. However, in FY 1991 the SRRAP was involved in many other activities, which are reported here. These include the continued maintenance of a solar radiation monitoring network in the southeast United States at six Historically Black Colleges and Universities (HBCU's), the transfer of solar radiation resource assessment technology through a variety of activities, participation in international programs, and the maintenance and operation of NREL's Solar Radiation Research Laboratory.

  11. Interim status report of the TMI personnel-dosimetry project

    International Nuclear Information System (INIS)

    Rich, B.L.; Alvarez, J.L.; Adams, S.R.

    1981-06-01

    The current 2-chip TLD personnel dosimeter in use at Three Mile Island (TMI) has been shown inadequate for the anticipated high beta/gamma fields during TMI recovery operations in some areas. This project surveyed the available dosimeter systems, set up an Idaho National Engineering Laboratory (INEL) prototype system, and compared this system with those commercial systems that could be made immediately available for comparison. Of the systems tested, the new INEL personnel dosimeter was found to produce the most accurate results for use in recovery operations at TMI-2. The other multiple-chip or multiple-filter systems were found less desirable at present. The most prominent deficiencies in the INEL dosimeter stem from the fact that it lacks a completely automated reader and its x-ray and thermal neutron responses require additional development. A automated prototype reader system may be in operation by the end of CY-1981. Three alternatives for operational dosimetry are discussed. A combination of a modified version of the presently used Harshaw 2-chip dosimeter and the INEL dosimeter is recommended

  12. Current status and prospects on Rokkasho nuclear fuel cycle project

    International Nuclear Information System (INIS)

    Suzuki, Mitsuo

    2003-01-01

    JNFL has been established aiming at fulfillment of Nuclear Fuel Cycle, as well as to contribute to the long-term and stable supply of nuclear power in Japan. 'Uranium Enrichment Plant' with its production of 1,050 SWU/y and planned to be expand to 1,500 SWU/y, 'Low Level Radioactive Waste Disposal Center' with 150,000/200 l drums stored, out of its 400,000 drums capacity, and 'Vitrified Waste Storage Center' with 760 canisters stored, out of its 1440 canisters capacity, are already in its operation. It is now preparing for the operation of '800 t/y Reprocessing Plant' and construction of '130t HM/y MOX Fuel Fabrication Plant'. As for the Reprocessing Plant, 780t of spent fuels has been already received and stored in the storage pools. Main plant is now in the course of test operation and planned to start the commercial operation by July 2006. Due to some defects found during the course of its construction, JNFL is now reviewing the Total Quality Assurance Structure to improve and reinforce its system. And for the MOX Fuel Fabrication Plant, activities towards obtaining the local autonomy's agreement for the construction are being made energetically. It is essential to obtain the good understanding of the public community to promote these projects successfully; JNFL is putting its best efforts to dispatch all the necessary information to the public in a timely manner. (author)

  13. Weight Care Project: Health professionals' attitudes and ability to assess body weight status - Study protocol

    LENUS (Irish Health Repository)

    Moorhead, Anne

    2011-03-31

    Abstract Background Health professionals working in primary care and public health have opportunities to address body weight status issues with their patients through face-to-face contact. The objectives of this all-Ireland project are: 1. to assess the attitudes, current practices\\/behaviours and knowledge of key health professional groups on body weight status; 2. to assess the health professional groups\\' ability to identify body weight status in both adults and children. The health professional groups are: (a) community related public health nurses; (b) school public health nurses; (c) GPs and practice nurses (primary care); and (d) occupational health nurses (workplace) from both Northern Ireland and the Republic of Ireland. Methods\\/Design This all-Ireland multi-disciplinary project follows a mixed methods approach using both quantitative and qualitative methodologies, and consists of four components: 1. Literature review - to explore the role of health professionals in managing obesity through spontaneous intervention in a variety of health promotion settings. 2. Telephone interviews and focus groups - to gain an in-depth insight into the views of health professionals in assessing body weight status. 3. Survey (primarily online but also paper-based) - to determine the attitudes, current practices\\/behaviours and knowledge of health professionals in assessing body weight status. 4. Online evaluation study - an online interactive programme will be developed to assess health professionals\\' ability to identify the body weight status of adults and children. Discussion This project will assess and report the attitudes, current practices\\/behaviours and knowledge of key health professional groups within Northern Ireland and the Republic of Ireland on body weight status, and their ability to identify body weight status in both adults and children. The results of this project will generate recommendations for clinical practice in managing obesity, which may

  14. Weight Care Project: Health professionals' attitudes and ability to assess body weight status - Study protocol

    Directory of Open Access Journals (Sweden)

    Murphy Kathy

    2011-03-01

    Full Text Available Abstract Background Health professionals working in primary care and public health have opportunities to address body weight status issues with their patients through face-to-face contact. The objectives of this all-Ireland project are: 1. to assess the attitudes, current practices/behaviours and knowledge of key health professional groups on body weight status; 2. to assess the health professional groups' ability to identify body weight status in both adults and children. The health professional groups are: (a community related public health nurses; (b school public health nurses; (c GPs and practice nurses (primary care; and (d occupational health nurses (workplace from both Northern Ireland and the Republic of Ireland. Methods/Design This all-Ireland multi-disciplinary project follows a mixed methods approach using both quantitative and qualitative methodologies, and consists of four components: 1. Literature review - to explore the role of health professionals in managing obesity through spontaneous intervention in a variety of health promotion settings. 2. Telephone interviews and focus groups - to gain an in-depth insight into the views of health professionals in assessing body weight status. 3. Survey (primarily online but also paper-based - to determine the attitudes, current practices/behaviours and knowledge of health professionals in assessing body weight status. 4. Online evaluation study - an online interactive programme will be developed to assess health professionals' ability to identify the body weight status of adults and children. Discussion This project will assess and report the attitudes, current practices/behaviours and knowledge of key health professional groups within Northern Ireland and the Republic of Ireland on body weight status, and their ability to identify body weight status in both adults and children. The results of this project will generate recommendations for clinical practice in managing obesity, which may

  15. LNG - Status in Denmark. Technology and potential. Project report

    Energy Technology Data Exchange (ETDEWEB)

    Naeslund, M.

    2012-05-15

    The interest for LNG both on a small and a large scale is increasing worldwide. The experiences and knowledge on LNG is limited in Denmark. The Danish gas companies' Technical Management Group (TCG) has asked for a status report including a technology description and an evaluation of the potential in Denmark. A survey of primarily small-scale LNG technology is done in the report. The focus is motivated by the new areas of gas utilisation that become possible with small-scale LNG. Small-scale LNG in this study is defined as LNG stored and used at the application or in an isolated gas grid. The small-scale use of LNG has today an almost negligible share of the total LNG trade but offers interesting new applications for gas utilisation. LNG on a small scale can be used primarily as: 1) Ship fuel. 2) Truck fuel (heavy duty long distance). 3) Individual users not connected to the natural gas grid. 4) Backup for upgraded biogas to individual users and vehicle fleets. 5) Security of supply or supply enhancement of heavily loaded parts of the gas grid. 6) Small-scale storage and/or peak shaving. All but the first topics are natural uses for the current Danish gas distributors. LNG as ship fuel may engage other specialized LNG companies. The report contains a technical description of the parts in primarily small-scale LNG handling and operation. Liquefaction, transport, storage, engine technologies, gas quality and safety aspects related to LNG are covered. There seem to be two more or less separate paths for LNG in Denmark, onshore and off-shore use. These are not, apparently, sharing their experiences and knowledge. Rules and regulations are also different which may create some problems in the interface, for example ship bunkering. Further studies are suggested in the area of gas quality and engine technologies and adaptation of foreign guidelines for small-scale installations to Danish conditions. These guidelines ought to be based on international standards and

  16. The Earthquake Source Inversion Validation (SIV) - Project: Summary, Status, Outlook

    Science.gov (United States)

    Mai, P. M.

    2017-12-01

    Finite-fault earthquake source inversions infer the (time-dependent) displacement on the rupture surface from geophysical data. The resulting earthquake source models document the complexity of the rupture process. However, this kinematic source inversion is ill-posed and returns non-unique solutions, as seen for instance in multiple source models for the same earthquake, obtained by different research teams, that often exhibit remarkable dissimilarities. To address the uncertainties in earthquake-source inversions and to understand strengths and weaknesses of various methods, the Source Inversion Validation (SIV) project developed a set of forward-modeling exercises and inversion benchmarks. Several research teams then use these validation exercises to test their codes and methods, but also to develop and benchmark new approaches. In this presentation I will summarize the SIV strategy, the existing benchmark exercises and corresponding results. Using various waveform-misfit criteria and newly developed statistical comparison tools to quantify source-model (dis)similarities, the SIV platforms is able to rank solutions and identify particularly promising source inversion approaches. Existing SIV exercises (with related data and descriptions) and all computational tools remain available via the open online collaboration platform; additional exercises and benchmark tests will be uploaded once they are fully developed. I encourage source modelers to use the SIV benchmarks for developing and testing new methods. The SIV efforts have already led to several promising new techniques for tackling the earthquake-source imaging problem. I expect that future SIV benchmarks will provide further innovations and insights into earthquake source kinematics that will ultimately help to better understand the dynamics of the rupture process.

  17. Canadian pediatric gastroenterology workforce: Current status, concerns and future projections

    Science.gov (United States)

    Morinville, Véronique; Drouin, Éric; Lévesque, Dominique; Espinosa, Victor M; Jacobson, Kevan

    2007-01-01

    BACKGROUND: There is concern that the Canadian pediatric gastroenterology workforce is inadequate to meet health care demands of the pediatric population. The Canadian Association of Gastroenterology Pediatric Committee performed a survey to determine characteristics and future plans of the Canadian pediatric gastroenterology workforce and trainees. METHODS: Estimates of total and pediatric populations were obtained from the 2001 Census of Population, Statistics Canada (with estimates to July 1, 2005). Data on Canadian pediatric gastroenterologists, including clinical full-time equivalents, sex, work interests, opinions on workforce adequacy, retirement plans, fellowship training programs and future employment plans of fellows, were gathered through e-mail surveys and telephone correspondence in 2005 and 2006. RESULTS: Canada had an estimated population of 32,270,507 in 2005 (6,967,853 people aged zero to 17 years). The pediatric gastroenterology workforce was estimated at 9.2 specialists per million children. Women accounted for 50% of the workforce. Physician to pediatric population ratios varied, with Alberta demonstrating the highest and Saskatchewan the lowest ratios (1:69,404 versus 1:240,950, respectively). Between 1998 and 2005, Canadian pediatric gastroenterology fellowship programs trained 65 fellows (65% international trainees). Twenty-two fellows (34%) entered the Canadian workforce. CONCLUSIONS: The survey highlights the variable and overall low numbers of pediatric gastroenterologists across Canada, an increasingly female workforce, a greater percentage of part-time physicians and a small cohort of Canadian trainees. In conjunction with high projected retirement rates, greater demands on the work-force and desires to partake in nonclinical activities, there is concern for an increasing shortage of pediatric gastroenterologists in Canada in future years. PMID:17948136

  18. Status of high temperature superconductor cable and fault current limiter projects at American Superconductor

    International Nuclear Information System (INIS)

    Maguire, J.F.; Yuan, J.

    2009-01-01

    This paper will describe the status of three key programs currently underway at American Superconductor Corp. The first program is the LIPA project which is a transmission voltage high temperature superconducting cable program, with funding support from the US Department of Energy. The 600 m cable, capable of carrying 574 MVA, was successfully installed and commissioned in LIPA grid on April 22, 2008. An overview of the project, system level design details and operational data will be provided. In addition, the status of the newly awarded LIPA II project will be described. The second program is Project Hydra, with funding support from the US Department of Homeland Security, to design, develop and demonstrate an HTS cable with fault current limiting functionality. The cable is 300 m long and is being designed to carry 96 MVA at a distribution level voltage of 13.8 kV. The cable will be permanently installed and energized in Manhattan, New York in 2010. The initial status of Project Hydra will be presented. The final program to be discussed is a transmission voltage, high temperature superconducting fault current limiter funded by the US DOE. The project encompasses the design, construction and test of a 115 kV FCL for power transmission within a time frame of 4-5 years. Installation and testing are planned for a Southern California Edison substation. A project overview and progress under the first phase will be reported.

  19. Status of high temperature superconductor cable and fault current limiter projects at American Superconductor

    Energy Technology Data Exchange (ETDEWEB)

    Maguire, J.F., E-mail: jmaguire@amsc.co [American Superconductor Co., 64 Jackson Road, Devens, MA 01434 (United States); Yuan, J. [American Superconductor Co., 64 Jackson Road, Devens, MA 01434 (United States)

    2009-10-15

    This paper will describe the status of three key programs currently underway at American Superconductor Corp. The first program is the LIPA project which is a transmission voltage high temperature superconducting cable program, with funding support from the US Department of Energy. The 600 m cable, capable of carrying 574 MVA, was successfully installed and commissioned in LIPA grid on April 22, 2008. An overview of the project, system level design details and operational data will be provided. In addition, the status of the newly awarded LIPA II project will be described. The second program is Project Hydra, with funding support from the US Department of Homeland Security, to design, develop and demonstrate an HTS cable with fault current limiting functionality. The cable is 300 m long and is being designed to carry 96 MVA at a distribution level voltage of 13.8 kV. The cable will be permanently installed and energized in Manhattan, New York in 2010. The initial status of Project Hydra will be presented. The final program to be discussed is a transmission voltage, high temperature superconducting fault current limiter funded by the US DOE. The project encompasses the design, construction and test of a 115 kV FCL for power transmission within a time frame of 4-5 years. Installation and testing are planned for a Southern California Edison substation. A project overview and progress under the first phase will be reported.

  20. Status of high temperature superconductor cable and fault current limiter projects at American Superconductor

    Science.gov (United States)

    Maguire, J. F.; Yuan, J.

    2009-10-01

    This paper will describe the status of three key programs currently underway at American Superconductor Corp. The first program is the LIPA project which is a transmission voltage high temperature superconducting cable program, with funding support from the US Department of Energy. The 600 m cable, capable of carrying 574 MVA, was successfully installed and commissioned in LIPA grid on April 22, 2008. An overview of the project, system level design details and operational data will be provided. In addition, the status of the newly awarded LIPA II project will be described. The second program is Project Hydra, with funding support from the US Department of Homeland Security, to design, develop and demonstrate an HTS cable with fault current limiting functionality. The cable is 300 m long and is being designed to carry 96 MVA at a distribution level voltage of 13.8 kV. The cable will be permanently installed and energized in Manhattan, New York in 2010. The initial status of Project Hydra will be presented. The final program to be discussed is a transmission voltage, high temperature superconducting fault current limiter funded by the US DOE. The project encompasses the design, construction and test of a 115 kV FCL for power transmission within a time frame of 4-5 years. Installation and testing are planned for a Southern California Edison substation. A project overview and progress under the first phase will be reported.

  1. Status of the Korean nuclear hydrogen production project

    International Nuclear Information System (INIS)

    Jonghwa, Chang; Won-Jae, Lee

    2010-01-01

    development on an enlarged scale in correspondence with the Generation IV International Forum. The second phase of the key technology development will greatly reduce the technical and economical risk in the nuclear hydrogen project. The government is also considering the construction of the NHDD plant and will start funding for a conceptual design from 2010. (authors)

  2. Contracts for field projects and supporting research on enhanced oil recovery. Progress review No. 80. Quarterly report, July--September, 1994

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-11-01

    This report contains information on petroleum enhanced recovery projects. In addition to project descriptions, contract numbers, principal investigators and project management information is included.

  3. Cogeneration and Small Power Production Quarterly Report to the California Public Utilities Commission. Second Quarter 1984

    Energy Technology Data Exchange (ETDEWEB)

    None

    1984-01-01

    At the end of the Second Quarter of 1984, the number of signed contracts and letter agreements for cogeneration and small power production projects was 334, with total estimated nominal capacity of 2,876 MW. Of these totals, 232 projects, capable of producing 678 MW, are operational (Table A). A map indicating the location of operational facilities under contract with PG and E is provided as Figure A. Developers of cogeneration projects had signed 80 contracts with a potential of 1,161 MW. Thirty-three contracts had been signed for solid waste/biomass projects for a total of 298 MW. In total, 118 contracts and letter agreements had been signed with cogeneration, solid waste, and biomass projects capable of producing 1,545 MW. PG and E also had under active discussion 46 cogeneration projects that could generate a total of 688 MW to 770 MW, and 13 solid waste or biomass projects with a potential of 119 MW to 139 MW. One contract had been signed for a geothermal project, capable of producing 80 MW. Two geothermal projects were under active discussion for a total of 2 MW. There were 8 solar projects with signed contracts and a potential of 37 MW, as well as 4 solar projects under active discussion for 31 MW. Wind farm projects under contract numbered 34, with a generating capability of 1,042 MW, Also, discussions were being conducted with 23 wind farm projects, totaling 597 MW. There were 100 wind projects of 100 kW or less with signed contracts and a potential of 1 MW, as well as 7 other small wind projects under active discussion. There were 71 hydroelectric projects with signed contracts and a potential of 151 MW, as well as 76 projects under active discussion for 505 MW. In addition, there were 18 hydroelectric projects, with a nominal capacity of 193 MW, that PG and E was planning to construct. Table B displays the above information. Appendix A displays in tabular form the status reports of the projects as of June 30, 1984.

  4. SiC/SiC fuel cladding R and D Project 'SCARLET': Status and future plan

    International Nuclear Information System (INIS)

    Kishimoto, Hirotatsu; Kohyama, Akira

    2015-01-01

    This paper provides the recent progress in SiC/SiC development towards early utilisation for LWRs based on NITE method. After the March 11 Disaster in East-Japan, ensuring safe technology for LWR became a top priority R and D in nuclear energy policy of Japan. Along this line, replacement of Zircaloy claddings with SiC/SiC based fuel cladding is becoming one of the most attractive options and a MEXT fund based project, SCARLET, and a METI fund based project have been launched as 5-year termed projects at Muroran Institute of Technology. These projects care for NITE process for making long SiC/SiC fuel pins and connecting technology integration. The SCARLET project also includes coolant compatibility and irradiation effect evaluations as LWR and LMFBR materials. The outline and the present status of the SCARLET project will be briefly introduced in the present paper. (authors)

  5. Quarterly report of RCRA groundwater monitoring data for period January 1--March 31, 1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-07-01

    This quarterly report contains data received between January and March 1995, which are the cutoff dates for this reporting period. This report may contain not only data from the January through March quarter, but also data from earlier sampling events that were not previously reported. Nineteen Resource Conservation and Recovery Act of 1976 (RCRA) groundwater monitoring projects are conducted at the Hanford Site. These projects include treatment, storage, and disposal facilities for both solid and liquid waste. The groundwater monitoring programs described in this report comply with the interim-status federal (Title 40 Code of Federal Regulation [CFR] Part 265) and state (Washington Administrative Code [WAC] 173-303-400) regulations. The RCRA projects are monitored under one of three programs: background monitoring, indicator parameter evaluation, or groundwater quality assessment.

  6. Los Alamos National Laboratory Yucca Mountain Site Characterization Project 1995 quality program status report

    International Nuclear Information System (INIS)

    Bolivar, S.L.

    1996-07-01

    This status report summarizes the activities and accomplishments of the Los Alamos National Laboratory Yucca Mountain Site Characterization Project's (YMP's) quality assurance program for January 1 to September 30, 1995. The report includes major sections on program activities and trend analysis

  7. 76 FR 76153 - Notice of Effectiveness of Exempt Wholesale Generator Status; Caney River Wind Project, LLC...

    Science.gov (United States)

    2011-12-06

    ...] Notice of Effectiveness of Exempt Wholesale Generator Status; Caney River Wind Project, LLC, Mesquite Solar 1, LLC, Copper Crossing Solar LLC, Copper Mountain Solar 1, LLC, Pinnacle Wind, LLC, Bellevue... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket Nos. EG11-115-000, EG11-116-000...

  8. Los Alamos National Laboratory Yucca Mountain Site Characterization Project: 1991 quality program status report

    International Nuclear Information System (INIS)

    1992-07-01

    This status report summarizes the activities and accomplishments of the Los Alamos National Laboratory (Los Alamos) Yucca Mountain Site Characterization Project's (YMP) quality assurance program for calendar year 1991. The report is divided into three Sections: Program Activities, Verification Activities, and Trend Analysis

  9. Status of parasitism in donkeys of project and control areas in ...

    African Journals Online (AJOL)

    The study was undertaken with the aim of comparing the status of parasitism in donkeys in the Donkey Health and welfare Project intervention (Bereh, Ada and Boset) and Control (Yekaduda, Gerado and Meki) areas of, Central Ethiopia, in 2005. Parasites are prime problem of donkeys among other problems including ...

  10. Yucca Mountain Project technical status report (TSR), October 1989--March 1990

    International Nuclear Information System (INIS)

    1990-01-01

    This Yucca Mountain Project Technical Status Report (TSR) on site characterization is the second in a series of reports that will be issued at approximately six-month intervals during site characterization. In addition, progress made toward the initiation and conduct of new site characterization activities is included. For this report, information on the technical progress made by Yucca Mountain Project participating organizations has been compiled covering the period from October 1989, through March 31, 1990. The status report consists of three sections: an introductory section; a section on the status of site characterization, which includes preparatory activities, sites programs, repository design, seals system design, waste package design, and performance assessment; and a reference section, which provides a complete listing of all published documents cited in the text. 59 refs

  11. The Absolutist Reformism: Projects of Political Reforms in Russia (2nd half of 18th century – 1st quarter of 19th century

    Directory of Open Access Journals (Sweden)

    Konstantin D. Bugrov

    2016-09-01

    Full Text Available The article deals with the phenomenon of absolutist reformism – a form of political culture that chronologically spans from the mid-18th century to 19th century, and is determined by both communicative context (genre, pragmatic purpose, and the social and political status of its participants, the members of court-administrative elite. The author argues that the principal reformers, who belonged to the court and administrative elite of Russian Empire, were competing with each other, and the reform proposals allowed the competitors to simultaneously improve their own positions within the structure of state governance and enact the absolute power of the monarch to bring the reform forth. However, that meant that the monarch was appearing in the reform proposals as an omnipotent arbiter capable of creating the social and political institutions by his will. Consequently, these reform proposals – starting from the early projects of the 1750es – 1760es, and finishing with the intense production of reform plans under Alexander I – were aimed at increasing the power of monarch, assuring its benevolent character, and protecting it from the potential usurpation from the inside of the bureaucratic apparatus. This logic of argumentation, which places the monarch against the bureaucracy, was to flourish later on in Russian 19th century.

  12. "The Career Development Quarterly": A Centennial Retrospective

    Science.gov (United States)

    Savickas, Mark L.; Pope, Mark; Niles, Spencer G.

    2011-01-01

    "The Career Development Quarterly" has been the premier journal in the field of vocational guidance and career intervention since its inception 100 years ago. To celebrate its centennial, 3 former editors trace its evolution from a modest and occasional newsletter to its current status as a major professional journal. They recount its history of…

  13. Status and Future Perspectives of the HIE-Isolde Project at CERN

    CERN Document Server

    Kadi, Y; Blumenfeld, Y; Calatroni, S; Catherall, R; Fraser, M A; Goddard, B; Parchet, D; Siesling, E; Venturini Delsolaro, W; Voulot, D; Williams, L R

    2012-01-01

    The High Intensity and Energy (HIE)-ISOLDE project aims at several important upgrades of the present ISOLDE radioactive beam facility at CERN. The main focus lies in the energy upgrade of the post-accelerated radionuclide beams from 3 MeV/u up to 10 MeV/u through the addition of superconducting cavities. This will open the possibility of many new types of experiments including transfer reactions throughout the nuclear chart. The first stage of this upgrade involves the design, construction, installation and commissioning of two high-β cryomodules downstream of REX-ISOLDE, the existing post-accelerator. Each cryomodule houses five high-β superconducting cavities and one superconducting solenoid. Prototypes of the Nb-sputtered Quarter Wave Resonators (QWRs) cavities for the new superconducting linear accelerator have been manufactured and are undergoing RF cold tests. The project also includes a design study of improved production targets to accommodate to the future increase of proton intensity delivered by ...

  14. Socioeconomic Status As a Risk Factor for Unintended Pregnancy in the Contraceptive CHOICE Project.

    Science.gov (United States)

    Iseyemi, Abigail; Zhao, Qiuhong; McNicholas, Colleen; Peipert, Jeffrey F

    2017-09-01

    To evaluate the association of low socioeconomic status as an independent risk factor for unintended pregnancy. We performed a secondary analysis of data from the Contraceptive CHOICE project. Between 2007 and 2011, 9,256 participants were recruited and followed for up to 3 years. The primary outcome of interest was unintended pregnancy; the primary exposure variable was low socioeconomic status, defined as self-report of either receiving public assistance or having difficulty paying for basic necessities. Four contraceptive groups were evaluated: 1) long-acting reversible contraceptive method (hormonal or copper intrauterine device or subdermal implant); 2) depot medroxyprogesterone acetate injection; 3) oral contraceptive pills, a transdermal patch, or a vaginal ring; or 4) other or no method. Confounders were adjusted for in the multivariable Cox proportional hazard model to estimate the effect of socioeconomic status on risk of unintended pregnancy. Participants with low socioeconomic status experienced 515 unintended pregnancies during 14,001 women-years of follow-up (3.68/100 women-years; 95% CI 3.37-4.01) compared with 200 unintended pregnancies during 10,296 women-years (1.94/100 women-years; 95% CI 1.68-2.23) among participants without low socioeconomic status. Women with low socioeconomic status were more likely to have an unintended pregnancy (unadjusted hazard ratio [HR] 1.8, 95% CI 1.5-2.2). After adjusting for age, education level, insurance status, and history of unintended pregnancy, low socioeconomic status was associated with an increased risk of unintended pregnancy (adjusted HR 1.4, 95% CI 1.1-1.7). Despite the removal of cost barriers, low socioeconomic status is associated with a higher incidence of unintended pregnancy.

  15. Status of Radon Related Activities in Member States Participating in Technical Cooperation Projects in Europe

    International Nuclear Information System (INIS)

    2017-03-01

    This publication summarizes the status of radon programmes at the start of 2014 in the Member States in Europe participating in the IAEA technical cooperation project on establishing enhanced approaches to the control of public exposure to radon. The current status was determined from responses to a questionnaire covering the following elements of a national radon action plan: policies and strategies; radon measurement surveys; establishment of reference levels; managing radon in existing buildings and in future buildings; education and training of professionals; and public awareness initiatives.

  16. Technical assistance for Meharry Medical College Energy Efficiency Project. Final project status and technical report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-05-08

    This report presents the results of a program to provide technical assistance to Meharry Medical College. The purpose of the program is to facilitate Meharry`s effort to finance a campus-wide facility retrofit. The US Department of Energy (USDOE) funded the program through a grant to the Tennessee Department of Economic and Community Development (TECD). The University of Memphis-Technology and Energy Services (UM-TES), under contract to TECD, performed program services. The report has three sections: (1) introduction; (2) project definition, financing, and participants; and (3) opportunities for federal participation.

  17. Tri-State Synfuels Project Review: Volume 12. Fluor project status. [Proposed Henderson, Kentucky coal to gasoline plant; engineering

    Energy Technology Data Exchange (ETDEWEB)

    1982-06-01

    The purpose of this report is to document and summarize activities associated with Fluor's efforts on the Tri-State Synfuels Project. The proposed facility was to be coal-to-transport fuels facility located in Henderson, Kentucky. Tri-State Synfuels Company was participating in the project as a partner of the US Department of Energy per terms of a Cooperative Agreement resulting from DOE's synfuel's program solicitation. Fluor's initial work plan called for preliminary engineering and procurement services to the point of commitment for construction for a Sasol Fischer-Tropsch plant. Work proceeded as planned until October 1981 when results of alternative coal-to-methanol studies revealed the economic disadvantage of the Synthol design for US markets. A number of alternative process studies followed to determine the best process configuration. In January 1982 Tri-State officially announced a change from Synthol to a Methanol to Gasoline (MTG) design basis. Further evaluation and cost estimates for the MTG facility eventually led to the conclusion that, given the depressed economic outlook for alternative fuels development, the project should be terminated. Official announcement of cancellation was made on April 13, 1982. At the time of project cancellation, Fluor had completed significant portions of the preliminary engineering effort. Included in this report are descriptions and summaries of Fluor's work during this project. In addition location of key project data and materials is identified and status reports for each operation are presented.

  18. Status of spallation neutron source program in High Intensity Proton Accelerator Project

    International Nuclear Information System (INIS)

    Oyama, Yukio

    2001-01-01

    Japan Atomic Energy Research Institute and High Energy Accelerator Organization are jointly designing a 1 MW spallation neutron source as one of the research facilities planned in the High Intensity Proton Accelerator Project. The spallation neutron source is driven by 3 GeV proton beam with a mercury target and liquid hydrogen moderators. The present status of design for these spallation source and relevant facility is overviewed. (author)

  19. Natural Gas Imports and Exports. Third Quarter Report 1999

    International Nuclear Information System (INIS)

    1999-01-01

    The second quarter 1997 Quarterly Report of Natural Gas Imports and Exports featured a Quarterly Focus report on cross-border natural gas trade between the United States and Mexico. This Quarterly Focus article is a follow-up to the 1997 report. This report revisits and updates the status of some of the pipeline projects discussed in 1997, and examines a number of other planned cross-border pipeline facilities which were proposed subsequent to our 1997 report. A few of the existing and proposed pipelines are bidirectional and thus have the capability of serving either Mexico, or the United States, depending on market conditions and gas supply availability. These new projects, if completed, would greatly enhance the pipeline infrastructure on the U.S.-Mexico border and would increase gas pipeline throughput capacity for cross-border trade by more than 1 billion cubic feet (Bcf) per day. The Quarterly Focus is comprised of five sections. Section I includes the introduction as well as a brief historic overview of U.S./Mexican natural gas trade; a discussion of Mexico's energy regulatory structure; and a review of trade agreements and a 1992 legislative change which allows for her cross-border gas trade in North America. Section II looks at initiatives that have been taken by the Mexican Government since 1995to open its energy markets to greater competition and privatization. Section III reviews Mexican gas demand forecasts and looks at future opportunities for U.S. gas producers to supplement Mexico's indigenous supplies in order to meet the anticipated rapid growth in demand. Section IV examines the U.S.-Mexico natural gas trade in recent years. It also looks specifically at monthly import and export volumes and prices and identifies short-term trends in this trade. Finally, Section V reviews the existing and planned cross-border gas pipeline infrastructure. The section also specifically describes six planned pipelines intended to expand this pipeline network and

  20. Natural Gas Imports and Exports. Third Quarter Report 1999

    Energy Technology Data Exchange (ETDEWEB)

    none

    1999-10-01

    The second quarter 1997 Quarterly Report of Natural Gas Imports and Exports featured a Quarterly Focus report on cross-border natural gas trade between the United States and Mexico. This Quarterly Focus article is a follow-up to the 1997 report. This report revisits and updates the status of some of the pipeline projects discussed in 1997, and examines a number of other planned cross-border pipeline facilities which were proposed subsequent to our 1997 report. A few of the existing and proposed pipelines are bidirectional and thus have the capability of serving either Mexico, or the United States, depending on market conditions and gas supply availability. These new projects, if completed, would greatly enhance the pipeline infrastructure on the U.S.-Mexico border and would increase gas pipeline throughput capacity for cross-border trade by more than 1 billion cubic feet (Bcf) per day. The Quarterly Focus is comprised of five sections. Section I includes the introduction as well as a brief historic overview of U.S./Mexican natural gas trade; a discussion of Mexico's energy regulatory structure; and a review of trade agreements and a 1992 legislative change which allows for her cross-border gas trade in North America. Section II looks at initiatives that have been taken by the Mexican Government since 1995to open its energy markets to greater competition and privatization. Section III reviews Mexican gas demand forecasts and looks at future opportunities for U.S. gas producers to supplement Mexico's indigenous supplies in order to meet the anticipated rapid growth in demand. Section IV examines the U.S.-Mexico natural gas trade in recent years. It also looks specifically at monthly import and export volumes and prices and identifies short-term trends in this trade. Finally, Section V reviews the existing and planned cross-border gas pipeline infrastructure. The section also specifically describes six planned pipelines intended to expand this pipeline

  1. CURRENT STATUS OF RESEARCH PROJECT ACTIVITIES IN MEDICAL UNIVERSITIES IN BULGARIA.

    Directory of Open Access Journals (Sweden)

    Svetoslav Garov

    2013-07-01

    Full Text Available Introduction: In Bulgaria there are five medical universities: in the cities of Sofia, Plovdiv, Varna, Pleven and Stara Zagora. Their main mission is training specialists in the fields of medicine and health care, increasing their qualification by means of postgraduate education and performing research activities. One of medical universities’ top priorities is encouraging research activities mainly aimed at preparation and implementation of research projects. Aim: The purpose of our study is to examine the current status of research project activities in Bulgarian medical universities.Material and methods: In order to define the science competitions related to Bulgarian medical universities we have applied a documentary and sociological approach. Results: Research projects that Bulgarian medical universities can apply for are divided into two groups – national and international. The most significant international projects are European ones since Bulgaria is an EU member state and this allows us to participate in such projects. Conclusion: Universities should strive for establishing even better conditions for encouraging application for research projects aimed at developing competent and experienced staff, even though the majority of them may not obtain approval for financing.The changes in the situation regarding Bulgarian science require the implementation and development of more research staff motivated to improve their knowledge and skills in the relevant dynamically changing competition and project field.

  2. Quarterly oil statistics. First quarter 1978

    Energy Technology Data Exchange (ETDEWEB)

    1978-01-01

    The aim of this report is to provide rapid, accurate and detailed statistics on oil supply and demand in the OECD area. Main components of the system are: complete balances of production, trade, refinery intake and output, final consumption, stock levels and changes; separate data for crude oil, NGL, feedstocks and nine product groups; separate trade data for main product groups, LPG and naphtha; imports for 41 origins; exports for 29 destinations; marine bunkers and deliveries to international civil aviation by product group; aggregates of quarterly data to annual totals; and natural gas supply and consumption.

  3. 94-1 Research and development project lead laboratory support. Status report, January 1--March 31, 1996

    International Nuclear Information System (INIS)

    Dinehart, M.

    1996-09-01

    This document reports status and technical progress for Los Alamos National Laboratories 94-1 Research and Development projects. An introduction to the project structure and an executive summary are included. Projects described include Electrolytic Decontamination, Combustibles, Detox, Sand, Slag, and Crucible, Surveillance, and Core Technology

  4. Trend chart: photovoltaic solar energy. Forth quarter 2016

    International Nuclear Information System (INIS)

    Coltier, Yves

    2017-02-01

    This publication presents a quarterly review of power generation from photovoltaic power plants connected to the French grid (continental France, Corsica and overseas territories): total connected load, quarterly distribution of new connections, progress of connected power during the last years, power generated since the beginning of the year and comparison with previous years, projects in progress, detailed regional results, methodology used

  5. Wind/photovoltaic power indicators. Second quarter 2015

    International Nuclear Information System (INIS)

    Reynaud, Didier

    2015-08-01

    This document presents a quarterly review of power generation from wind and photovoltaic power plants connected to the French grid (continental France, Corsica and overseas territories): total connected load, quarterly distribution of new connections, progress of connected power during the last years, power generated since the beginning of the year and comparison with previous years, projects in progress, regional balance sheet

  6. Wind/photovoltaic power indicators. Third quarter 2014

    International Nuclear Information System (INIS)

    Reynaud, Didier

    2014-11-01

    This document presents a quarterly review of power generation from wind and photovoltaic power plants connected to the French grid (continental France, Corsica and overseas territories): total connected load, quarterly distribution of new connections, progress of connected power during the last years, power generated since the beginning of the year and comparison with previous years, projects in progress, regional balance sheet

  7. Wind/photovoltaic power indicators. Third quarter 2010

    International Nuclear Information System (INIS)

    Thienard, Helene

    2010-11-01

    This document presents a quarterly review of power generation from wind and photovoltaic power plants connected to the French grid (continental France, Corsica and overseas territories): total connected load, quarterly distribution of new connections, progress of connected power during the last years, power generated since the beginning of the year and comparison with previous years, projects in progress, regional balance sheet

  8. Trend chart: photovoltaic solar energy. Third quarter 2016

    International Nuclear Information System (INIS)

    Coltier, Yves

    2016-11-01

    This publication presents a quarterly review of power generation from photovoltaic power plants connected to the French grid (continental France, Corsica and overseas territories): total connected load, quarterly distribution of new connections, progress of connected power during the last years, power generated since the beginning of the year and comparison with previous years, projects in progress, detailed regional results, methodology used

  9. Trend chart: photovoltaic solar energy. Forth quarter 2015

    International Nuclear Information System (INIS)

    Reynaud, Didier

    2016-02-01

    This publication presents a quarterly review of power generation from photovoltaic power plants connected to the French grid (continental France, Corsica and overseas territories): total connected load, quarterly distribution of new connections, progress of connected power during the last years, power generated since the beginning of the year and comparison with previous years, projects in progress, detailed regional results, methodology used

  10. Trend chart: photovoltaic solar energy. First quarter 2017

    International Nuclear Information System (INIS)

    2017-05-01

    This publication presents a quarterly review of power generation from photovoltaic power plants connected to the French grid (continental France, Corsica and overseas territories): total connected load, quarterly distribution of new connections, progress of connected power during the last years, power generated since the beginning of the year and comparison with previous years, projects in progress, detailed regional results, methodology used

  11. Wind/photovoltaic power indicators. Third quarter 2012

    International Nuclear Information System (INIS)

    Thienard, Helene

    2012-11-01

    This document presents a quarterly review of power generation from wind and photovoltaic power plants connected to the French grid (continental France, Corsica and overseas territories): total connected load, quarterly distribution of new connections, progress of connected power during the last years, power generated since the beginning of the year and comparison with previous years, projects in progress, regional balance sheet

  12. Wind/photovoltaic power indicators. Forth quarter 2014

    International Nuclear Information System (INIS)

    Reynaud, Didier

    2015-02-01

    This document presents a quarterly review of power generation from wind and photovoltaic power plants connected to the French grid (continental France, Corsica and overseas territories): total connected load, quarterly distribution of new connections, progress of connected power during the last years, power generated since the beginning of the year and comparison with previous years, projects in progress, regional balance sheet

  13. Wind/photovoltaic power indicators. Second quarter 2014

    International Nuclear Information System (INIS)

    Reynaud, Didier

    2014-08-01

    This document presents a quarterly review of the power generation from wind and photovoltaic power plants connected to the French grid (continental France, Corsica and overseas territories): total connected load, quarterly distribution of new connections, progress of connected power during the last years, power generated since the beginning of the year and comparison with previous years, projects in progress, regional balance sheet

  14. Actual status of project Mochovce NPP units 3 and 4 completion

    International Nuclear Information System (INIS)

    Niznan, S.

    2005-01-01

    In this presentation author deals with actual status of project Mochovce NPP units 3 and 4 completion. Present state of Mochovce NPP, Units 3 and 4 enables real assumption to completion. It is expected that such supplier companies can be used which are experienced in field of nuclear projects. Based on budget of 2002, it seems that completion costs of 45 billions SKK are real. These figures were confirmed by study performed by TRACTEBEL in 2004. Based on experience from Bohunice NPP completion as well as from Mochovce NPP, Units 1 and 2 completion and if decision milestone and project start up deadlines will be observed according to modified preliminary schedule of Mochovce NPP Units 3 and 4 completion, it seems as real that Unit 3 will be completed till 06/2011 and Unit 4 - till 12/2011.

  15. BX in situ oil shale project. Annual technical progress report, March 1, 1979-February 29, 1980 and quarterly technical progress report, December 1, 1979-February 29, 1980

    Energy Technology Data Exchange (ETDEWEB)

    Dougan, P.M.

    1980-03-20

    During the year, design, construction and installation of all project equipment was completed, and continuous steam injection began on September 18, 1979 and continued until February 29, 1980. In the five-month period of steam injection, 235,060 barrels of water as steam at an average wellhead pressure of 1199 psig and an average wellhead temperature of 456/sup 0/F were injected into the eight project injection wells. Operation of the project at design temperature and pressure (1000/sup 0/F and 1500 psig) was not possible due to continuing problems with surface equipment. Environmental monitoring at the project site continued during startup and operation.

  16. Technology status in support of refined technical baseline for the Spent Nuclear Fuel project. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Puigh, R.J.; Toffer, H.; Heard, F.J.; Irvin, J.J.; Cooper, T.D.

    1995-10-20

    The Spent Nuclear Fuel Project (SNFP) has undertaken technology acquisition activities focused on supporting the technical basis for the removal of the N Reactor fuel from the K Basins to an interim storage facility. The purpose of these technology acquisition activities has been to identify technology issues impacting design or safety approval, to establish the strategy for obtaining the necessary information through either existing project activities, or the assignment of new work. A set of specific path options has been identified for each major action proposed for placing the N Reactor fuel into a ``stabilized`` form for interim storage as part of this refined technical basis. This report summarizes the status of technology information acquisition as it relates to key decisions impacting the selection of specific path options. The following specific categories were chosen to characterize and partition the technology information status: hydride issues and ignition, corrosion, hydrogen generation, drying and conditioning, thermal performance, criticality and materials accountability, canister/fuel particulate behavior, and MCO integrity. This report represents a preliminary assessment of the technology information supporting the SNFP. As our understanding of the N Reactor fuel performance develops the technology information supporting the SNFP will be updated and documented in later revisions to this report. Revision 1 represents the incorporation of peer review comments into the original document. The substantive evolution in our understanding of the technical status for the SNFP (except section 3) since July 1995 have not been incorporated into this revision.

  17. Technology status in support of refined technical baseline for the Spent Nuclear Fuel project. Revision 1

    International Nuclear Information System (INIS)

    Puigh, R.J.; Toffer, H.; Heard, F.J.; Irvin, J.J.; Cooper, T.D.

    1995-01-01

    The Spent Nuclear Fuel Project (SNFP) has undertaken technology acquisition activities focused on supporting the technical basis for the removal of the N Reactor fuel from the K Basins to an interim storage facility. The purpose of these technology acquisition activities has been to identify technology issues impacting design or safety approval, to establish the strategy for obtaining the necessary information through either existing project activities, or the assignment of new work. A set of specific path options has been identified for each major action proposed for placing the N Reactor fuel into a ''stabilized'' form for interim storage as part of this refined technical basis. This report summarizes the status of technology information acquisition as it relates to key decisions impacting the selection of specific path options. The following specific categories were chosen to characterize and partition the technology information status: hydride issues and ignition, corrosion, hydrogen generation, drying and conditioning, thermal performance, criticality and materials accountability, canister/fuel particulate behavior, and MCO integrity. This report represents a preliminary assessment of the technology information supporting the SNFP. As our understanding of the N Reactor fuel performance develops the technology information supporting the SNFP will be updated and documented in later revisions to this report. Revision 1 represents the incorporation of peer review comments into the original document. The substantive evolution in our understanding of the technical status for the SNFP (except section 3) since July 1995 have not been incorporated into this revision

  18. Contracts for field projects and supporting research on enhanced oil recovery. Progress review No. 82, quarterly report, January--March 1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-06-01

    This document consists of a list of projects supporting work on oil recovery programs. A publications list and index of companies and institutions is provided. The remaining portion of the document provides brief descriptions on projects in chemical flooding, gas displacement, thermal recovery, geoscience, resource assessment, and reservoir class field demonstrations.

  19. Quarterly report of RCRA groundwater monitoring data for period October 1 through December 31, 1994

    International Nuclear Information System (INIS)

    1995-04-01

    Hanford Site interim-status groundwater monitoring projects are conducted as either background, indicator parameter evaluation, or groundwater quality assessment monitoring programs as defined in the Resource Conservation and Recovery Act of 1976 (RCRA); and open-quotes Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilitiesclose quotes (Title 40 Code of Federal Regulations [CFR] Part 265), as amended. Compliance with the 40 CFR 265 regulations is required by the Washington Administrative Code (WAC) 173-303. This report contains data from Hanford Site groundwater monitoring projects. The location of each facility is shown. Westinghouse Hanford Company (WHC) manages the RCRA groundwater monitoring projects for federal facilities on the Hanford Site. Performing project management, preparing groundwater monitoring plans, well network design and installation, specifying groundwater data needs, performing quality control (QC) oversight, data management, and preparing project sampling schedules are all parts of this responsibility. Pacific Northwest Laboratory (PNL) administers the contract for analytical services and provides groundwater sampling services to WHC for the RCRA groundwater monitoring program. This quarterly report contains data received between October and December 1994, which are the cutoff dates for this reporting period. This report may contain not only data from the October through December quarter, but also data from earlier sampling events that were not previously reported

  20. Quarterly report of RCRA groundwater monitoring data for period April 1 through June 30, 1994

    International Nuclear Information System (INIS)

    1994-10-01

    Hanford Site interim-status groundwater monitoring projects are conducted as either background, indicator parameter evaluation, or groundwater quality assessment monitoring programs as defined in the Resource Conservation and Recovery Act of 1976 (RCRA); and ''Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities,'' as amended (40 Code of Federal Regulations [CFR] 265). Compliance with the 40 CFR 265 regulations is required by the Washington Administrative Code (WAC) 173-303. This report contains data from Hanford Site groundwater monitoring projects. Westinghouse Hanford Company manages RCRA groundwater monitoring projects for federal facilities on the Hanford Site. Project management, specifying data needs, performing quality control oversight, managing data, and preparing project sampling schedules are all parts of this responsibility. This quarterly report contains data received between May 20 and August 19, 1994, which are the cutoff dates for this reporting period. This report may contain not only data from the April through June quarter but also data from earlier sampling events that were not previously reported

  1. Quarterly Environmental Radiological Survey Summary Third Quarter 1998, 100, 200, 300, and 600 Areas; TOPICAL

    International Nuclear Information System (INIS)

    MCKINNEY, S.M.

    1998-01-01

    This report provides a summary of the radiological surveys performed in support of near-facility environmental monitoring at the Hanford Site. The Third Quarter 1998 survey results and the status of actions required are summarized: (1) All of the eighty-five environmental radiological surveys scheduled during July, August and September were performed as planned. Fifty-one of the surveys were conducted at Project Hanford Management Contractors (PHMC) sites and thirty-four at Environmental Restoration Contractor (ERC) sites. Contamination above background levels was found at seventeen of the PHMC waste sites and two of the ERC waste sites. Contamination levels as high and gt;1,000,000 disintegrations per minute (dpm) per 100 cm(sup 2) were reported. Of these contaminated surveys nine were in Underground Radioactive Material (URM) areas, three were in unposted areas and seven were in contamination areas. The contamination found within four of the URM and three of the CA areas was immediately cleaned up and no further action was required. The remaining five URM and two unposted sites were posted and along with the five CA sites will require remediation. Radiological Problem Reports (RPR's) were issued and the sites were turned over to the landlord for further action as required. (2) During the second quarter of 1998, 1.2 hectares (3.0 acres) were stabilized and radiologically down posted from Contamination Area (CA)/Soil Contamination (SC) to URM. (3) Four hectares (10 acres) located south and west of B-Plant were posted as a radiological buffer area as a result of a contamination spread. This off-normal occurrence is currently being investigated. (4) Four Surveillance Compliance Inspection Reports (SCIRs) remained open and had not been resolved. Tank Farms Operations has responsibility for the unresolved SCIRs

  2. EMSL Quarterly Highlights Report: FY 2008, 3rd Quarter

    Energy Technology Data Exchange (ETDEWEB)

    Showalter, Mary Ann

    2008-09-16

    The EMSL Quarterly Highlights Report covers the science, staff and user recognition, and publication activities that occurred during the 1st quarter (October 2007 - December 2007) of Fiscal Year 2008.

  3. EMSL Quarterly Highlights Report: 1st Quarter, FY08

    Energy Technology Data Exchange (ETDEWEB)

    Showalter, Mary Ann

    2008-01-28

    The EMSL Quarterly Highlights Report covers the science, staff and user recognition, and publication activities that occurred during the 1st quarter (October 2007 - December 2007) of Fiscal Year 2008.

  4. EMSL Quarterly Highlights Report: 1st Quarter, Fiscal Year 2009

    Energy Technology Data Exchange (ETDEWEB)

    Showalter, Mary Ann; Kathmann, Loel E.; Manke, Kristin L.

    2009-02-02

    The EMSL Quarterly Highlights Report covers the science, staff and user recognition, and publication activities that occurred during the 1st quarter (October 2008 - December 2008) of Fiscal Year 2009.

  5. Quarterly environmental radiological survey summary: Second Quarter 1995 100, 200, 300, and 600 Areas

    International Nuclear Information System (INIS)

    McKinney, S.M.

    1995-01-01

    This report provides a summary of the radiological surveys performed in support of the operational environmental monitoring program at the Hanford Site. The Second Quarter 1995 survey results and the status of actions required from current and past reports are summarized

  6. Quarterly environmental radiological survey summary. Fourth quarter, 1995 100, 200, 300, and 600 Areas

    International Nuclear Information System (INIS)

    McKinney, S.M.; Markes, B.M.

    1996-01-01

    This report provides a summary of the radiological surveys performed in support of the operational environmental monitoring program at the Hanford Site. The Fourth Quarter 1995 survey results and the status of actions required from current and past reports are described

  7. Evaluation of nuclear facility decommissioning projects. Status report. Humboldt Bay Power Plant Unit 3, SAFSTOR decommissioning

    International Nuclear Information System (INIS)

    Baumann, B.L.; Haffner, D.R.; Miller, R.L.; Scotti, K.S.

    1986-06-01

    This document explains the purpose of the US Nuclear Regulatory Commission's (NRC) Evaluation of Nuclear Facility Decommissioning Projects (ENFDP) program and summarizes information concerning the decommissioning of the Humboldt Bay Power Plant (HBPP) Unit 3 facility. Preparations to put this facility into a custodial safe storage (SAFSTOR) mode are currently scheduled for completion by June 30, 1986. This report gives the status of activities as of June 1985. A final summary report will be issued after completion of this SAFSTOR decommissioning activity. Information included in this status report has been collected from the facility decommissioning plan, environmental report, and other sources made available by the licensee. This data has been placed in a computerized data base system which permits data manipulation and summarization. A description of the computer reports that can be generated by the decommissioning data system (DDS) for Humboldt Bay and samples of those reports are included in this document

  8. Decontamination and decommissioning project status of the TRIGA mark-2±3 research reactors

    International Nuclear Information System (INIS)

    Jung, K. J.; Baek, S. T.; Jung, W. S.; Park, S. K.; Jung, K. H.

    1999-01-01

    TRIGA Mark-II, the first research reactor in Korea, has operated since 1962, and the second one, TRIGA Mark-III since 1972. Both of them had their operation phased out in 1995 due to their lives and operation of the new research reactor, HANARO at the Korea Atomic Energy Research Institute (KAERI) in Taejeon. Decontamination and decommissioning (D and D) project of the TRIGA Mark-II and Mark-III was started in January 1997 and will be completed in December 2002. In the first year of the project, work was performed in preparation of the decommissioning plan, start of the environmental impact assessment and setup licensing procedure and documentation for the project with cooperation of Korea Institute of Nuclear Safety (KINS). In 1998, Hyundai Engineering Company (HEC) is the main contractor to do design and licensing documentation for the D and D of both reactors. British Nuclear Fuels plc (BNFL) is technical assisting partner of HEC. The decommissioning plan document was submitted to the Ministry of Science and Technology (MOST) for the decommissioning license in December 1998, and it expecting to be issued a license at the end of September 1999. The goal of this project is to release the reactor site and buildings as an unrestricted area. This paper summarizes current status and future plan for the D and D project

  9. Decontamination and decommissioning project status of the TRIGA Mark II and III in Korea

    International Nuclear Information System (INIS)

    Paik, S.T.; Park, S.K.; Chung, K.W.; Chung, U.S.; Jung, K.J.

    1999-01-01

    TRIGA Mark-II, the first research reactor in Korea, has operated since 1962, and the second one, TRIGA Mark-III since 1972. Both of them had their operation phased out in 1995 due to their lives and operation of the new research reactor, HANARO (High-flux Advanced Neutron Application Reactor) at the Korea Atomic Energy Institute (KAERI) in Taejon. Decontamination and decommissioning (D and D) project of TRIGA Mark-II and Mark-III was started in January 1997 and will be completed in December 2002. The first year of the project, work was performed in preparation of the decommissioning plan, start of the environmental impact assessment and setup licensing procedure and documentation for the project with cooperation of Korea Institute of Nuclear Safety (KINS). Hyundai Engineering Company (HEC) is the main contractor to do design and licensing documentation for the D and D of both reactors. British Nuclear Fuels plc (BNFL) is the technical assisting partner of HEC. The decommissioning plan document was submitted to the Ministry of Since and Technology (MOST) for the decommissioning license in December 1998, and it expecting to be issued a license in mid 1999. The goal of this project is to release the reactor site and buildings as an unrestricted area. This paper summarizes current status and future plan for the D and D project. (author)

  10. 94-1 Research and development project lead laboratory support. Status report, July 1, 1996--September 30, 1996

    Energy Technology Data Exchange (ETDEWEB)

    Rink, N. [comp.

    1997-03-01

    This document reports status and technical progress for Los Alamos 94-1 Research and Development projects. Updated schedule charts are shown in the appendix. This is the fourth status report published for Los Alamos National Laboratory 94-1 Research and Development Project Support. The Department of Energy Office of Environmental Management (DOE/EM) funds these projects in order to support the storage or disposal of legacy plutonium and plutonium-bearing materials resulting from weapons production throughout the DOE complex. This document also serves as an end-for-year review of projects and positions the program for FY97.

  11. National Status and Trends, Benthic Surveillance Project Chemistry Data, 1984-1992, National Centers for Coastal Ocean Science

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The National Status and Trends (NS&T) Benthic Surveillance Project Chemistry data file reports the trace concentrations of a suite of chemical contaminants in...

  12. National Status and Trends, Benthic Surveillance Project Sites, 1984-1992, National Centers for Coastal Ocean Science

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — This data set reports information regarding the nominal sampling locations for the National Status and Trends Benthic Surveillance Project sites. One record is...

  13. National Status and Trends, Benthic Surveillance Project Chemistry Data, 1984-1992, National Centers for Coastal Ocean Science

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The National Status and Trends (NSandT) Benthic Surveillance Project Chemistry data file reports the trace concentrations of a suite of chemical contaminants in...

  14. South African Crime Quarterly

    African Journals Online (AJOL)

    South African Crime Quarterly is an inter-disciplinary peer-reviewed journal that promotes professional discourse and the publication of research on the subjects of crime, criminal justice, crime prevention, and related matters including state and non-state responses to crime and violence. South Africa is the primary focus for ...

  15. English Leadership Quarterly, 1993.

    Science.gov (United States)

    Strickland, James, Ed.

    1993-01-01

    These four issues of the English Leadership Quarterly represent those published during 1993. Articles in number 1 deal with parent involvement and participation, and include: "Opening the Doors to Open House" (Jolene A. Borgese); "Parent/Teacher Conferences: Avoiding the Collision Course" (Robert Perrin); "Expanding Human…

  16. Quarterly fiscal policy

    NARCIS (Netherlands)

    Kendrick, D.A.; Amman, H.M.

    2014-01-01

    Monetary policy is altered once a month. Fiscal policy is altered once a year. As a potential improvement this article examines the use of feedback control rules for fiscal policy that is altered quarterly. Following the work of Blinder and Orszag, modifications are discussed in Congressional

  17. Status of initial phase of site-specific seismic monitoring: Basalt Waste Isolation Project

    International Nuclear Information System (INIS)

    Rohay, A.C.

    1981-01-01

    This report presents the status of the initial phase of site-specific seismic monitoring work conducted under the Basalt Waste Isolation Project. This work is currently organized under two main elements: (1) a portable array; and (2) a baseline data collection array. Progress toward the development of each array is discussed along with an interpretation of preliminary data obtained from the test of a borehole seismometer at potential repository depths. The text is supplemented by nine figures and one table. 9 figs., 1 tab

  18. Present status of spallation target development. JAERI/KEK Joint Project

    International Nuclear Information System (INIS)

    Hino, R.; Kaminaga, M.; Haga, K.

    2001-01-01

    The Japan Atomic Energy Research Institute (JAERI) and the High Energy Accelerator Research Organization (KEK) are promoting a plan to construct a neutron scattering facility under the JAERI/KEK Joint Project. Design and R and D works are being carried out vigorously for realizing the mercury target system consisting of the mercury target, moderators and reflectors working as a spallation neutron source, as well as a remote handling system for exchanging such components which will be highly irradiated. This report introduces an outline of the present status of design and development activities on the spallation target system. (author)

  19. Implementation status of the extreme light infrastructure - nuclear physics (ELI-NP) project

    Energy Technology Data Exchange (ETDEWEB)

    Gales, S., E-mail: sydney.gales@eli-np.ro; Zamfir, N. V., E-mail: sydney.gales@eli-np.ro [ELI-NP, Horia Hulubei National Institute for Physics and Nuclear Engineering, 30 Reactorului Street, RO-077125 Bucharest-Magurele (Romania)

    2015-02-24

    The Project Extreme Light Infrastructure (ELI) is part of the European Strategic Forum for Research Infrastructures (ESFRI) Roadmap. ELI will be built as a network of three complementary pillars at the frontier of laser technologies. The ELI-NP pillar (NP for Nuclear Physics) is under construction near Bucharest (Romania) and will develop a scientific program using two 10 PW lasers and a Compton back-scattering high-brilliance and intense gamma beam, a marriage of laser and accelerator technology at the frontier of knowledge. In the present paper, the technical description of the facility, the present status of the project as well as the science, applications and future perspectives will be discussed.

  20. Trend chart: photovoltaic solar energy. Second quarter 2016

    International Nuclear Information System (INIS)

    Reynaud, Didier

    2016-08-01

    This newsletter presents a quarterly review of the French photovoltaic park situation: evolution of the connected power, new connected facilities, production by power range, ongoing projects and regional statistics (number of facilities, power, distribution, evolution)

  1. Trend chart: photovoltaic solar energy. First quarter 2016

    International Nuclear Information System (INIS)

    Reynaud, Didier

    2016-05-01

    This newsletter presents a quarterly review of the French photovoltaic park situation: evolution of the connected power, new connected facilities, production by power range, ongoing projects and regional statistics (number of facilities, power, distribution, evolution)

  2. Quarterly environmental data summary for third quarter 1999

    Energy Technology Data Exchange (ETDEWEB)

    McCracken, Stephen H. [Weldon Spring Site, St. Charles, MO (United States)

    1999-11-05

    A copy of the quarterly Environmental Data Summary (QEDS) for the third quarter of 1999 is enclosed. The data, except for air monitoring data and site KPA generated data (uranium analyses), were received from the contract laboratories, verified by the WSSRAP verification group and merged into the data base during the third quarter of 1999. Selected KPA results for on-site total uranium analyses performed during the quarter are also included. Air monitoring data presented are the most recent complete sets of quarterly data.

  3. Western Gas Sands Project. Status report, 1 June--30 June 1979

    Energy Technology Data Exchange (ETDEWEB)

    1979-01-01

    This edition of the WGSP status report summarizes June 1979 progress of government-sponsored projects directed toward increasing gas production from the low-permeability gas sands of the western United States. Background information is provided in the September 1977, status report, NVO/0655-100. Work by the USGS toward resource assessment in the four primary study areas continued. CK GeoEnergy started a core hole in Grand County, Utah. During June, projects of the National Laboratories and Energy Technology Centers continued. Bartlesville Energy Technology Center continued work on fracture conductivity, rock-fluid interaction, and log evaluation and interpretation techniques. Experimental and theoretical work on hydraulic fracturing mechanics and analysis of well test data continued at Lawrence Livermore Laboratory. The CER Corporation RB-MHF 3 final report has been distributed. Cyclic gas injection began again on CIG's Sprague No. 1 well. The DOE well test facility was transported to Vernal, Utah for minor repairs and storage. The GPE wells, Natural Buttes Units 9, 14 and 18 flowed to sales. The Mitchell Energy Muse-Duke No. 1 well flowed 3,000 MCFD in June. Attempts to kill the Mobil PCU F31-13G well failed. Exploratory coring of the Sandia Hole No. 6 Formation Interface Fracture Experiment resumed in June.

  4. Quarterly environmental radiological survey summary - second quarter 1997 100, 200, 300, and 600 areas

    International Nuclear Information System (INIS)

    McKinney, S.M.; Marks, B.M.

    1997-01-01

    This report provides a summary of the radiological surveys performed in support of near-facility environmental monitoring at the Hanford Site. The Second Quarter 1997 survey results and the status of actions required are summarized below: All of the routine environmental radiological surveys scheduled during April, May, and June 1997, were performed as planned with the exception of UN-216-E-9. This site was not surveyed as stabilization activities were in progress. The sites scheduled for the Environmental Restorations Contractor (ERC) team were switched with those identified for the third quarter as there was a conflict with vegetation management activities

  5. Evaluation of the health status of six volunteers from the Mars 500 project using pulse analysis.

    Science.gov (United States)

    Shi, Hong-Zhi; Fan, Quan-Chun; Gao, Jian-Yi; Liu, Jun-Lian; Bai, Gui-E; Mi, Tao; Zhao, Shuang; Liu, Yu; Xu, Dong; Guo, Zhi-Feng; Li, Yong-Zhi

    2017-08-01

    To comprehensively evaluate the health status of 6 volunteers from the Mars 500 Project through analyzing their pulse graphs and determining the changes in cardiovascular function, degree of fatigue and autonomic nervous function. Six volunteers were recruited; all were male aged 26-38 years (average 31.83±4.96 years). Characteristic parameters reflflecting the status of cardiovascular functions were extracted, which included left ventricular contraction, vascular elasticity and peripheral resistance. The degree of fatigue was determined depending on the difference between the calendar age and biological age, which was calculated through the analysis of blood pressure value and characteristic parameters. Based on the values of pulse height variation and pulse time variation on a 30-s pulse graph, autonomic nervous function was evaluated. All parameters examined were marked on an equilateral polygon to form an irregular polygon of the actual fifigure, then health status was evaluated based on the coverage area of the actual fifigure. The results demonstrated: (1) volunteers developed weakened pulse power, increased vascular tension and peripheral resistance, and slight decreased ventricular systolic function; (2) the degree of fatigue was basically mild or moderate; and (3) autonomic nervous function was excited but generally balanced. These volunteers were in the state of sub-health. According to Chinese medicine theories, such symptoms are mainly caused by the weakening of healthy qi, Gan (Liver) failing in free coursing, and disharmony between Gan and Wei (Stomach), which manifests as a weak and string-like pulse.

  6. EDF - Quarterly Financial Information

    International Nuclear Information System (INIS)

    Trivi, Carole; Boissezon, Carine de; Hidra, Kader

    2014-01-01

    EDF's sales in the first quarter of 2014 were euro 21.2 billion, down 3.9% from the first quarter of 2013. At constant scope and exchange rates, sales were down 4.2% due to mild weather conditions, which impacted sales of electricity in France, gas sales abroad and trading activities in Europe. UK sales were nonetheless sustained by B2B sales due to higher realised wholesale market prices. In Italy, sales growth was driven by an increase in electricity volumes sold. The first quarter of 2014 also saw the strengthening of the Group's financial structure with the second phase of its multi-annual hybrid funding programme (nearly euro 4 billion equivalent) as well as the issue of two 100-year bonds in dollars and sterling aimed at significantly lengthening average debt maturity. 2014 outlook and 2014-2018 vision: - EDF Group has confirmed its financial objectives for 2014; - Group EBITDA excluding Edison: organic growth of at least 3%; - Edison EBITDA: recurring EBITDA target of euro 1 billion and at least euro 600 million in 2014 before effects of gas contract re-negotiations; - Net financial debt / EBITDA: between 2x and 2.5x; - Pay-out ratio of net income excluding non-recurring items post-hybrid: 55% to 65%. The Group has reaffirmed its goal of achieving positive cash flow after dividends, excluding Linky, in 2018

  7. Environmental monitoring for the DOE coolside and LIMB demonstration extension projects. Quarterly report for the period of February, March and April 1991

    Energy Technology Data Exchange (ETDEWEB)

    White, T.; Contos, L.; Adams, L. [Radian Corp., Research Triangle Park, NC (United States). Progress Center

    1992-02-01

    The purpose of this document is to present environmental monitoring data collected during the US DOE Limestone Injection Multistage Burner (LIMB) Demonstration Project Extension. The objective of the LIMB program is to demonstrate the sulfur dioxide (SO{sub 2}) and nitrogen oxide (NO{sub x}) emission reduction capabilities of the LIMB system. The LIMB system is a retrofit technology to be used for existing coal-fired boilers equipped with electrostatic precipitators. (VC)

  8. Present status and future directions of the Mayo/IBM PACS project

    Science.gov (United States)

    Morin, Richard L.; Forbes, Glenn S.; Gehring, Dale G.; Salutz, James R.; Pavlicek, William

    1991-07-01

    This joint project began in 1988 and was motivated by the need to develop an alternative to the archival process in place at that time (magnetic tape) for magnetic resonance imaging and neurological computed tomography. In addition, this project was felt to be an important step in gaining the necessary clinical experience for the future implementation of various aspects of electronic imaging. The initial phase of the project was conceived and developed to prove the concept, test the fundamental components, and produce performance measurements for future work. The key functions of this phase centered on attachment of imaging equipment (GE Signa) and archival processes using a non-dedicated (institutionally supplied) local area network (LAN). Attachment of imaging equipment to the LAN was performed using commercially available devices (Ethernet, PS/2, Token Ring). Image data were converted to ACR/NEMA format with retention of the vendor specific header information. Performance measurements were encouraging and led to the design of following projects. The second phase has recently been concluded. The major features of this phase have been to greatly expand the network, put the network into clinical use, establish an efficient and useful viewing station, include diagnostic reports in the archive data, provide wide area network (WAN) capability via ISDN, and establish two-way real-time video between remote sites. This phase has heightened both departmental and institutional thought regarding various issues raised by electronic imaging. Much discussion regarding both present as well as future archival processes has occurred. The use of institutional LAN resources has proven to be adequate for the archival function examined thus far. Experiments to date have shown that use of dedicated resources will be necessary for retrieval activities at even a basic level. This report presents an overview of the background present status and future directions of the project.

  9. The Ongkharak Nuclear Research Center (ONRC) research reactor project: a status review

    International Nuclear Information System (INIS)

    Rusch, R.; Jacobi, A. Jr.; Yamkate, P.

    2001-01-01

    The new Ongkharak Nuclear Research Center in the vicinity of Bangkok, Thailand is planned to replace the more than 30 years old facilities located in the Chatuchak district, Bangkok. An international team led by general atomics (GA) is designing and constructing the new research complex. It comprises a 10 MW TRIGA type reactor, an isotope production and a centralized waste processing and storage facility. Electrowatt-Ekono Ltd. was hired by the Thai Government Agency, the Office of Atomic Energy for Peace (OAEP), as a consultant to the project. As the project is now approaching the end of its 4 th year, it now stands at a decisive turning point. Basic design is nearly completed and detailed design is well advanced. The turnkey part of the contract including the reactor island, the isotope and waste facilities are still awaiting the issuance of the Construction Permit. Significant progress has been made on the other part of the project, which includes all the supporting infrastructure facilities. The Preliminary Safety Analysis Report (PSAR), prepared by GA, has been reviewed by various parties, including by nuclear safety experts from the IAEA, which has provided continuous support to the OAEP. Experts from the Argonne National Laboratory have been involved in the reviews as well. The PSAR is now under consideration at the Nuclear Facility Safety Sub-Committee (NFSS) of the Thai Atomic Energy for Peace Commission for issuing the Construction Permit of the ONRC Research Reactor. The following paper gives an overview of the project and its present status, outlining the features of the planned facilities and the issues the project is presently struggling with. Major lessons of the past 4 years are highlighted and an outlook into the future is attempted. (orig.)

  10. Quarterly environmental radiological survey summary: Third quarter 1994--100, 200, 300, and 600 Areas

    International Nuclear Information System (INIS)

    McKinney, S.M.

    1994-11-01

    This report provides a summary of the radiological surveys performed on waste disposal sites located at the Hanford Site. The Third Quarter 1994 survey results and the status of actions required from current and past reports and are summarized below: (1) All the routine environmental radiological surveys scheduled during July, August, and September 1994 were completed except for the D Island vent riser area. The surveys for the 200-W railways, spurs, and sidings were completed during this period after being delayed by equipment problems during the second quarter. (2) No Compliance Assessment Reports (CARs) were issued for sites found out of compliance with standards identified in WHC-CM-7-5, Environmental Compliance. (3) Two Surveillance Compliance/Inspection Reports (SCIRs) were closed during the Third Quarter of 1994. (4) Eleven open SCIRs had not been resolved

  11. Social status of rural women in the focus of a developmental project

    Directory of Open Access Journals (Sweden)

    Stjepanović-Zaharijevski Dragana

    2006-01-01

    Full Text Available One of the goals of the project called "The milky river", which deals with the integral development of the dairy production, is to initiate the development of the sustainable and profitable production of milk and dairy products through grouping producers and supporting their position in the society they live in. Women are more than men engaged in the dairy production chain and they have a direct view of the whole dairy production process. So it was necessary to adapt the grouping to their needs, as well as to make some practical mechanisms of their involvement in the project activities. In this way, the strategy of the project helped with offering equal chances to women and men, and by reducing the gender inequality, it also helped with making a chance for a new life perspective for women. Through interviews and by focus-grouping the data were collected which represented the first picture of the dairy production in the region of Niš, including its gender characteristics, among other things. Two years later, the qualitative analysis of the indicators of the rural women’s social status in this region in the context of the realization of the project activities, has shown that there has been an important movement forward towards the gender equality which can be attributed to the successful project implementation. Women, as an important factor in the dairy production chain, seem to be joined and encouraged. They seem to be empowered at the level of their knowledge decision making and autonomous activity taking through various forms of education, joint farmer group work, as well as through various forms of cooperation with supporting institutions and other partners within the project activity framework. The overwhelming impression seems to be that joint work and cooperation are necessary conditions for the development of any individual farmers’ production, as well as for the referent rural development which requires the support of all the

  12. WBP/SIGAME the Brazilian BIG-GT demonstration project actual status and perspectives

    International Nuclear Information System (INIS)

    Carpentier, E.; Silva, A.

    1998-01-01

    Located in the tropics, with the sun shining all year round, and with its vast territory, Brazil may be regarded as having all the basic conditions to develop a modern Biomass for Electricity industry. Those characteristics together with: (a) the necessity of developing new energy resources for electricity production, in the northeast of the country; (b) the results of studies made by various entities, including CHESF; (c) the progress achieved by the BIG-GT technology; (d) the organisation of the Global Environment Facility (GEF); (e) and the support of the Brazilian government, through the Ministry of Science and Technology (MCT), provided the unique opportunity for the implementation of a commercial demonstration of that technology in Brazil. This paper describes the idea, scope, challenges, lessons, and actual status of development of the WBP/SIGAME project. It also highlights some institutional issues, budget figures, and energy prices. (author)

  13. Current Status of the LOFAR EoR Key Science Project

    Science.gov (United States)

    Koopmans, L. V. E.; LOFAR EoR KSP Team

    2018-05-01

    A short status update on the LOFAR Epoch of Reionization (EoR) Key Science Project (KSP) is given, regarding data acquisition, data processing and analysis, and current power-spectrum limits on the redshifted 21-cm signal of neutral hydrogen at redshifts z = 8 - 10. With caution, we present a preliminary astrophysical analysis of ~60 hr of processed LOFAR data and their resulting power spectrum, showing that potentially already interesting limits on X-ray heating during the Cosmic Dawn can already be gained. This is by no means the final analysis of this sub-set of data, but illustrates the future potential when all nearly 3000 hr of data in hand on two EoR windows will have been processed.

  14. Licensing Status of New and Expanding In-Situ Recovery Uranium Projects in the United States

    Energy Technology Data Exchange (ETDEWEB)

    Catchpole, G.; Thomas, M., E-mail: gccatchpole@uranerz.com [Uranerz Energy Corporation (URZ), Casper, WY (United States)

    2014-05-15

    The authors investigated the licensing status of new in-situ recovery (“ISR”) uranium projects, as well as the expansion of existing projects, within the United States (“US”). Specific emphasis and analysis is placed on those projects within the states of Texas and Wyoming. Of note, information used to prepare this paper was obtained from public sources that included company web sites, the US Securities and Exchange Commission, the US Nuclear Regulatory Commission (“NRC”), the US Energy Information Agency (“EIA”), and the relevant state regulatory agencies. The renewed interest in the production of natural uranium has been motivated, in part, by the increased sale price of yellowcake beginning around 2003 resulting in numerous new and existing natural resources companies acquiring mineral rights in the United States. Because of the economic favorability in terms of both operating and capital costs of ISR mines versus conventional mines in the US (with its relatively low grade of uranium ore), the model for most companies was to acquire mineral properties that had the potential for being mined using the ISR method. There were, however, exceptions to this model. The Uravan mineral district in southwest Colorado and southeast Utah, where relatively high-grade, shallow uranium deposits have the potential to be mined using underground methods, is one such exception. However, the focus of this paper will be on ISR projects. In Wyoming, which has been the top producer of natural uranium among the 50 states for the past seven years, there is one producing ISR mine (Bill Smith — Highland), one ISR mine on standby (Christensen Ranch), and two ISR uranium projects licensed but not yet built (Gas Hills and North Butte). Cameco Resources is planning to develop two ISR projects in Wyoming that have been licensed but not yet constructed. Additionally, three new uranium companies (Ur-Energy, Uranerz and Uranium One) have filed applications with the federal and

  15. Current status of decommissioning projects and their strategies in advanced countries

    International Nuclear Information System (INIS)

    Chung, U. S.; Lee, K. W.; Hwang, D. S.; Park, S. K.; Hwang, S. T.; Paik, S. T.; Park, J. H.; Choi, Y. D.; Chung, K. H.; Lee, K. I.; Hong, S. B.

    2007-06-01

    At the Korea Atomic Energy Research Institute(KAERI), two projects for decommissioning of the research reactors and uranium conversion plant are carried out. The number of nuclear facilities to be dismantled will be much increased in future and the decommissioning industries will be enlarged. Keeping pace with this increasing tendency, each country formulated their own strategies and regulation systems, and applied their own technologies. The international organizations such as the IAEA and the OECD/NEA also prepared standards in technologies and regulation upon decommissioning and recommended to adopt them to the decommissioning projects. These strategies and technologies are very different country by country due to the different site dependent conditions and it will not be reasonable to evaluate their merits and weakness. The world wide status of the decommissioning, highlighted on that of 5 countries of USA, UK, France, Germany and Japan because they are advanced counties in nuclear industries, are summarized and their site specific conditions are evaluated. The scopes of the evaluation are decommissioning strategies, licensing procedures and requirements focused on decommissioning plan, waste management, technology development and so on. The detailed decommissioning progresses of several typical example sites were introduced. The activities on decommissioning field of the international organization, increased according to the enlarged decommissioning industries, are also summarized

  16. Overview of ITER project. Objective, history, status of development, structure and its future

    International Nuclear Information System (INIS)

    Matsuda, S.

    2003-01-01

    The objective of ITER Project is to demonstrate the scientific and technological feasibility of fusion energy for peaceful use. To achieve this goal, the Conceptual Design Activities (CDA 1988-1990) and the Engineering Design Activities (EDA 1992-2001) were conducted by the joint effort of EU, Japan, RF and US under the auspices of IAEA. Engineering design has been developed consistently with plasma physics databases obtained by the world-wide magnetic fusion devices up to and during the EDA. Technology R and D including development, manufacturing and testing of scalable models of major components have been also conducted and ensured manufacturing and technical feasibility of ITER. Such technical readiness to start ITER construction urged formal government negotiation initially by Canada, EU, Japan and RF, and intense meetings have been held since November 2001. The US and China have joined since Feb. 2003. Four candidate sites have been proposed by Canada, EU and Japan for construction and have been evaluated. Once the agreement will be made, the construction takes about 10 years to complete, followed by the operation and exploitation phase lasting about 20 years. This paper gives an overview of ITER Project including its role in the long range fusion program, history, status of development, collaboration structure and its future program. (author)

  17. Current status of decommissioning projects and their strategies in advanced countries

    Energy Technology Data Exchange (ETDEWEB)

    Chung, U. S.; Lee, K. W.; Hwang, D. S.; Park, S. K.; Hwang, S. T.; Paik, S. T.; Park, J. H.; Choi, Y. D.; Chung, K. H.; Lee, K. I.; Hong, S. B

    2007-06-15

    At the Korea Atomic Energy Research Institute(KAERI), two projects for decommissioning of the research reactors and uranium conversion plant are carried out. The number of nuclear facilities to be dismantled will be much increased in future and the decommissioning industries will be enlarged. Keeping pace with this increasing tendency, each country formulated their own strategies and regulation systems, and applied their own technologies. The international organizations such as the IAEA and the OECD/NEA also prepared standards in technologies and regulation upon decommissioning and recommended to adopt them to the decommissioning projects. These strategies and technologies are very different country by country due to the different site dependent conditions and it will not be reasonable to evaluate their merits and weakness. The world wide status of the decommissioning, highlighted on that of 5 countries of USA, UK, France, Germany and Japan because they are advanced counties in nuclear industries, are summarized and their site specific conditions are evaluated. The scopes of the evaluation are decommissioning strategies, licensing procedures and requirements focused on decommissioning plan, waste management, technology development and so on. The detailed decommissioning progresses of several typical example sites were introduced. The activities on decommissioning field of the international organization, increased according to the enlarged decommissioning industries, are also summarized.

  18. Final status of the salt repository project waste package program experimental database

    International Nuclear Information System (INIS)

    Thornton, B.M.; Reimus, P.W.

    1988-03-01

    This report describes the final status of the Salt Repository Project Waste Package Program Experimental Database. The data base serves as a clearinghouse for all data collected within the Waste Package Program (WPP) and its predecessor programs at Pacific Northwest Laboratory (PNL). The database was maintained using RS/1 database management software. Documented assurance that the entries in the database were consistent with experimental records was provided by having each experimentalist inspect the entries and signify that they were in agreement with the records. The inspection and signoff were done per PNL technical procedures. Data for which it was impossible to obtain the experimentalist's inspection and signature were segregated from the rest of the database, although they could still be accessed by WPP staff. The WPPED contains two groups of subdirectories. One group contains data taken prior to the installation of quality assurance procedures at PNL. The other group of subdirectories contains data taken under the NQA-1 procedures since their installation in April 1985. As part of closeout activities in the Salt Repository Project, the WPP database has been archived onto magnetic media. The data in the database are available by request on magnetic media or in hardcopy form. 2 refs

  19. Metallurgical Laboratory (HWMF) Groundwater Monitoring Report, Fourth Quarter 1994

    International Nuclear Information System (INIS)

    Chase, J.A.

    1995-03-01

    Groundwater flow direction and rate in the M-Area Aquifer Zone were similar to previous quarters. Conditions affecting determination of groundwater flow directions and rates in the Upper Lost Lake Aquifer Zone, Lower Lost Lake Aquifer Zone, and the Middle Sand Aquifer Zone of the Crouch Branch Confining Units were also similar to previous quarters. During second quarter 1994, SRS received South Carolina Department of Health and Environmental Control approval for constructing five point-of-compliance wells and two plume definition wells near the Met Lab Hazardous Waste Management Facility. This project began in July 1994 and is complete; however, analytical data from these wells are not yet available

  20. Los Alamos National Laboratory Yucca Mountain Site Characterization Project 1992 quality program status report

    International Nuclear Information System (INIS)

    Bolivar, S.L.; Burningham, A.; Chavez, P.

    1994-03-01

    This status report summarizes the activities and accomplishments of the Los Alamos Yucca Mountain Site Characterization Project's quality assurance program for calendar year 1992. The report includes major sections on Program Activities and Trend Analysis. Program Activities are discussed periodically at quality meetings. The most significant issue addressed in 1992 has been the timely revision of quality administrative procedures. The procedure revision process was streamlined from 55 steps to 7. The number of forms in procedures was reduced by 38%, and the text reduced by 29%. This allowed revision in 1992 of almost half of all implementing procedures. The time necessary to complete the revision process (for a procedure) was reduced from 11 months to 3 months. Other accomplishments include the relaxation of unnecessarily strict training requirements, requiring quality assurance reviews only from affected organizations, and in general simplifying work processes. All members of the YMP received training to the new Orientation class Eleven other training classed were held. Investigators submitted 971 records to the Project and only 37 were rejected. The software program has 115 programs approved for quality-affecting work. The Project Office conducted 3 audits and 1 survey of Los Alamos activities. We conducted 14 audits and 4 surveys. Eight corrective action reports were closed, leaving only one open. Internally, 22 deficiencies were recognized. This is a decrease from 65 in 1991. Since each deficiency requires about 2 man weeks to resolve, the savings are significant. Problems with writing acceptable deficiency reports have essentially disappeared. Trend reports for 1992 were examined and are summarized herein. Three adverse trends have been closed; one remaining adverse trend will be closed when the affected procedures are revised. The number of deficiencies issued to Los Alamos compared to other participants is minimal

  1. Current status on advanced aqueous reprocessing process (next) in FaCT project

    International Nuclear Information System (INIS)

    Washiya, Tadahiro; Myochin, Munetaka; Koyama, Tomozo

    2009-01-01

    Japan Atomic Energy Agency (JAEA) launched the Fast Reactor Cycle Technology Development (FaCT) project in cooperation with the Japanese electric utilities in 2006. An integration of the advanced aqueous reprocessing concept and the simplified pelletizing fuel fabrication was selected as the most promising fuel cycle system. In order to accomplish the integration, R and D tasks were launched as FaCT Project in 2006 by Japanese joint team. The New Extraction System for TRU Recovery (NEXT) system is an advanced aqueous reprocessing concept which was based on the well established aqueous reprocessing for LWR spent fuel and newly applied processes such as uranium crystallization and extraction chromatography for MAs recovery. Main task of the NEXT process is to develop the TRU recovery process and equipments with high reliability, criticality safety, high durability and remote maintainability. In the FaCT project, all innovative technologies are planned to be developed within the next decade focusing on the future commercialization of FBR cycle systems. The judgment of the adoption of each innovative technology will be made by 2010 based on the results of R and Ds. The development of each technology is to be completed by around 2015. By the same time, it is scheduled to present the conceptual design of commercial and demonstrative fast reactor cycle facilities. The six items (Disassembling and shearing, Fuel dissolution, Uranium Crystallization, Single cycle co-extraction of U, Pu and Np, MA recovery by extraction chromatography and Waste treatment) have been identified as the issues to be developed corresponding to each process step. Current R and D status and prospects of this system until around 2015 is reported. (author)

  2. Environmental Biosciences Program Quarterly Report

    Energy Technology Data Exchange (ETDEWEB)

    Lawrence C. Mohr, M.D.

    2009-01-30

    Current research projects have focused Environmental Biosciences Program (EBP) talent and resources on providing the scientific basis for risk-based standards, risk-based decision making and the accelerated clean-up of widespread environmental hazards. These hazards include trichloroethylene, low-dose ionizing radiation (gamma and neutron) and alpha radiation from plutonium. Trichloroethylene research has been conducted as a joint collaborative effort with the University of Georgia. Work on the trichloroethylene research projects has been slowed as a result of funding uncertainties. The impact of these funding uncertainties has been discussed with the United States Department of Energy (DOE). Laboratory work has been completed on several trichloroethylene risk assessment projects, and these projects have been brought to a close. Plans for restructuring the performance schedule of the remaining trichloroethylene projects have been submitted to the department. A comprehensive manuscript on the scientific basis of trichloroethylene risk assessment is in preparation. Work on the low-dose radiation risk assessment projects is also progressing at a slowed rate as a result of funding uncertainties. It has been necessary to restructure the proponency and performance schedule of these projects, with the project on Low-Dose Radiation: Epidemiology Risk Models transferred to DOE Office of Science proponency under a separate funding instrument. Research on this project will continue under the provisions of the DOE Office of Science funding instrument, with progress reported in accordance with the requirements of that funding instrument. Progress on that project will no longer be reported in quarterly reports for DE-FC09-02CH11109. Following a meeting at the Savannah River Site on May 8, 2008, a plan was submitted for development of an epidemiological cohort study and prospective medical surveillance system for the assessment of disease rates among workers at the Savannah River

  3. Data management for the Clinch River Breeder Reactor Plant Project by use of document status and hold systems

    International Nuclear Information System (INIS)

    Hunt, C.S.; Beck, A.E.; Akhtar, M.S.

    1982-01-01

    This paper describes the development, framework, and scope of the Document Status System and the Document Hold System for the Clinch River Breeder Reactor Plant Project. It shows how data are generated at five locations and transmitted to a central computer for processing and storage. The resulting computerized data bank provides reports needed to perform day-to-day management and engineering planning. Those reports also partially satisfy the requirements of the Project's Quality Assurance Program

  4. (Shippingport Atomic Power Station). Quarterly operating report, fourth quarter 1980

    Energy Technology Data Exchange (ETDEWEB)

    1980-01-01

    At the beginning of the fourth quarter of 1980, the Shippingport Atomic Power Station remained shutdown for the normally planned semiannual maintenance and testing program, initiated September 12, 1980. Operational testing began on November 7. Maximum power was achieved November 28 and was maintained throughout the remainder of the quarter except as noted. The LWBR Core has generated 19,046.07 EFPH from start-up through the end of the quarter. During this quarter, approximately 0.000025 curies of Xe 133 activity were released from the station. During the fourth quarter of 1980, 1081 cubic feet of radioactive solid waste was shipped out of state for burial. These shipments contained 0.037 curies of radioactivity.

  5. Current status and future prospects of Japanese national project on coated conductor development and its applications

    Science.gov (United States)

    Shiohara, Y.; Yoshizumi, M.; Izumi, T.; Yamada, Y.

    2008-09-01

    Four years of the current five-year national project since 2003 for development of coated conductors using Y-system superconductors have passed and lots of remarkable results have been achieved. In this paper, the current status and the future prospect of this project are reviewed. The current national project comprises several groups of national laboratories, universities and private companies. The group of high performance tape development, consisting of Fujikura and SRL-NCCC, has worked on the tape by PLD-REBCO superconducting tapes on the PLD-CeO 2/IBAD-GZO buffered substrates. The high product of Ic and L equal to 112,166 A m was achieved in the 368 m-304.8 A GdBCO tape whose Ic value is mostly above 350 A/cm-w. The performance under the magnetic fields was also improved up to 42 A at 3 T in a GdBCO short film with doping of ZrO 2. About 61 m long GdBCO tape with ZrO 2 doping showed a high Ic value of 220 A at self field and 30 A at 3 T. On the other hand, the other group focusing on the low production cost has worked on processes of TFA-MOD and MOCVD, etc. The extremely high Ic value of 735 A/cm-w was attained in the TFA-MOD films on PLD-CeO 2/IBAD-GZO/Hastelloy C276 substrate by means of using the effect of Ba-poor nominal composition. In the efforts for long tape production, 200 m long tapes with high Ic values of 200 A/cm-w and 205 A/cm-w were obtained by MOD-YBCO/PLD-CeO 2/IBAD-GZO/Hastelloy C276 and PLD-HoBCO on buffered NiW substrate, respectively. The Ic × L value of the MOD-derived tape was 40,000 A m, which is the highest value in the world by the MOD process. Based on the above achievements on the coated conductor process development, two new additional goals were set in the project. One is the development for the extremely low cost tape and another is the development of the basic technologies for making the electric power devices including cables, transformers, motors, current-limiters and cryocoolers. Some of the new themes already revealed the

  6. Current status and future prospects of Japanese national project on coated conductor development and its applications

    Energy Technology Data Exchange (ETDEWEB)

    Shiohara, Y. [Superconductivity Research Laboratory, ISTEC, Shinonome 1-10-13, Koto-ku, Tokyo 135-0062 (Japan)], E-mail: shiohara@istec.or.jp; Yoshizumi, M.; Izumi, T. [Superconductivity Research Laboratory, ISTEC, Shinonome 1-10-13, Koto-ku, Tokyo 135-0062 (Japan); Yamada, Y. [Superconductivity Research Laboratory, ISTEC, Nagoya Coated Conductor Center, 2-4-1, Mutsuno, Atsuta-ku, Nagoya 456-8587 (Japan)

    2008-09-15

    Four years of the current five-year national project since 2003 for development of coated conductors using Y-system superconductors have passed and lots of remarkable results have been achieved. In this paper, the current status and the future prospect of this project are reviewed. The current national project comprises several groups of national laboratories, universities and private companies. The group of high performance tape development, consisting of Fujikura and SRL-NCCC, has worked on the tape by PLD-REBCO superconducting tapes on the PLD-CeO{sub 2}/IBAD-GZO buffered substrates. The high product of I{sub c} and L equal to 112,166 A m was achieved in the 368 m-304.8 A GdBCO tape whose I{sub c} value is mostly above 350 A/cm-w. The performance under the magnetic fields was also improved up to 42 A at 3 T in a GdBCO short film with doping of ZrO{sub 2}. About 61 m long GdBCO tape with ZrO{sub 2} doping showed a high I{sub c} value of 220 A at self field and 30 A at 3 T. On the other hand, the other group focusing on the low production cost has worked on processes of TFA-MOD and MOCVD, etc. The extremely high I{sub c} value of 735 A/cm-w was attained in the TFA-MOD films on PLD-CeO{sub 2}/IBAD-GZO/Hastelloy C276 substrate by means of using the effect of Ba-poor nominal composition. In the efforts for long tape production, 200 m long tapes with high I{sub c} values of 200 A/cm-w and 205 A/cm-w were obtained by MOD-YBCO/PLD-CeO{sub 2}/IBAD-GZO/Hastelloy C276 and PLD-HoBCO on buffered NiW substrate, respectively. The I{sub c} x L value of the MOD-derived tape was 40,000 A m, which is the highest value in the world by the MOD process. Based on the above achievements on the coated conductor process development, two new additional goals were set in the project. One is the development for the extremely low cost tape and another is the development of the basic technologies for making the electric power devices including cables, transformers, motors, current

  7. Current status and future prospects of Japanese national project on coated conductor development and its applications

    International Nuclear Information System (INIS)

    Shiohara, Y.; Yoshizumi, M.; Izumi, T.; Yamada, Y.

    2008-01-01

    Four years of the current five-year national project since 2003 for development of coated conductors using Y-system superconductors have passed and lots of remarkable results have been achieved. In this paper, the current status and the future prospect of this project are reviewed. The current national project comprises several groups of national laboratories, universities and private companies. The group of high performance tape development, consisting of Fujikura and SRL-NCCC, has worked on the tape by PLD-REBCO superconducting tapes on the PLD-CeO 2 /IBAD-GZO buffered substrates. The high product of I c and L equal to 112,166 A m was achieved in the 368 m-304.8 A GdBCO tape whose I c value is mostly above 350 A/cm-w. The performance under the magnetic fields was also improved up to 42 A at 3 T in a GdBCO short film with doping of ZrO 2 . About 61 m long GdBCO tape with ZrO 2 doping showed a high I c value of 220 A at self field and 30 A at 3 T. On the other hand, the other group focusing on the low production cost has worked on processes of TFA-MOD and MOCVD, etc. The extremely high I c value of 735 A/cm-w was attained in the TFA-MOD films on PLD-CeO 2 /IBAD-GZO/Hastelloy C276 substrate by means of using the effect of Ba-poor nominal composition. In the efforts for long tape production, 200 m long tapes with high I c values of 200 A/cm-w and 205 A/cm-w were obtained by MOD-YBCO/PLD-CeO 2 /IBAD-GZO/Hastelloy C276 and PLD-HoBCO on buffered NiW substrate, respectively. The I c x L value of the MOD-derived tape was 40,000 A m, which is the highest value in the world by the MOD process. Based on the above achievements on the coated conductor process development, two new additional goals were set in the project. One is the development for the extremely low cost tape and another is the development of the basic technologies for making the electric power devices including cables, transformers, motors, current-limiters and cryocoolers. Some of the new themes already

  8. Status and Mission Applicability of NASA's In-Space Propulsion Technology Project

    Science.gov (United States)

    Anderson, David J.; Munk, Michelle M.; Dankanich, John; Pencil, Eric; Liou, Larry

    2009-01-01

    The In-Space Propulsion Technology (ISPT) project develops propulsion technologies that will enable or enhance NASA robotic science missions. Since 2001, the ISPT project developed and delivered products to assist technology infusion and quantify mission applicability and benefits through mission analysis and tools. These in-space propulsion technologies are applicable, and potentially enabling for flagship destinations currently under evaluation, as well as having broad applicability to future Discovery and New Frontiers mission solicitations. This paper provides status of the technology development, near-term mission benefits, applicability, and availability of in-space propulsion technologies in the areas of advanced chemical thrusters, electric propulsion, aerocapture, and systems analysis tools. The current chemical propulsion investment is on the high-temperature Advanced Material Bipropellant Rocket (AMBR) engine providing higher performance for lower cost. Investments in electric propulsion technologies focused on completing NASA's Evolutionary Xenon Thruster (NEXT) ion propulsion system, a 0.6-7 kW throttle-able gridded ion system, and the High Voltage Hall Accelerator (HiVHAC) thruster, which is a mid-term product specifically designed for a low-cost electric propulsion option. Aerocapture investments developed a family of thermal protections system materials and structures; guidance, navigation, and control models of blunt-body rigid aeroshells; atmospheric models for Earth, Titan, Mars and Venus; and models for aerothermal effects. In 2009 ISPT started the development of propulsion technologies that would enable future sample return missions. The paper describes the ISPT project's future focus on propulsion for sample return missions. The future technology development areas for ISPT is: Planetary Ascent Vehicles (PAV), with a Mars Ascent Vehicle (MAV) being the initial development focus; multi-mission technologies for Earth Entry Vehicles (MMEEV) needed

  9. Status of the mechanical design of the 650 MHz cavities for Project X

    Energy Technology Data Exchange (ETDEWEB)

    Barbanotti, S.; Grimm, C.; Champion, M.; Foley, M.; Ginsburg, C.M.; Gonin, I.; Peterson, T.; Ristori, L.; Yakovlev, V.; /Fermilab

    2011-03-01

    In the high-energy section of the Project X Linac, acceleration of H{sup -} ions takes place in superconducting cavities operating at 650 MHz. Two families of five-cell elliptical cavities are planned: beta = 0.61 and beta = 0.9. A specific feature of the Project X Linac is low beam loading, and thus, low bandwidth and higher sensitivity to microphonics. Efforts to optimize the mechanical design of the cavities to improve their mechanical stability in response to the helium bath pressure fluctuations will be presented. These efforts take into account constraints such as cost and ease of fabrication. Also discussed will be the overall design status of the cavities and their helium jackets. The proposed design of the 3 GeV Project X superconducting (SC) Linac employs 650 MHz five-cell elliptical cavities to accelerate 1.0 mA of average H-beam current in the 160-3000 MeV energy range. The 650 MHz region of the Linac is divided into two sections with two different geometric phase velocity factors: beta = 0.61 to cover the 160-520 MeV range and beta = 0.9 to cover the 520-3000 MeV range. Approximately 40 beta = 0.61 and 150 beta = 0.9 cavities are currently planned for the project. An R&D program is in progress at FNAL, in collaboration with TJNAF and India, to develop the 650 MHz cavities for the proposed Linac design. This R&D program includes the design and fabrication of several beta = 0.61 and beta = 0.9 single-cell prototypes for evaluation prior to production of the five-cell cavities. FNAL has contracted AES to fabricate the beta = 0.9 prototypes, while TJNAF is building beta = 0.61 prototypes of their own design. In the remainder of this paper we will restrict our discussion to the five-cell beta = 0.9 cavities.

  10. Environmental Restoration Operations: Consolidated Quarterly Report January -March 2017

    Energy Technology Data Exchange (ETDEWEB)

    Cochran, John R. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2017-07-01

    This Environmental Restoration Operations (ER) Consolidated Quarterly Report (ER Quarterly Report) provides the status of ongoing corrective action activities being implemented at Sandia National Laboratories, New Mexico (SNL/NM) during the January, February, and March 2017 quarterly reporting period. Table I-1 lists the Solid Waste Management Units (SWMUs) and Areas of Concern (AOCs) identified for corrective action at SNL/NM. Sections I.2.1 and I.2.2 summarize the work completed during this quarter. Section I.2.1 summarizes the quarterly activities at sites undergoing corrective action field activities. Field activities are conducted at the three groundwater AOCs (Burn Site Groundwater [BSG AOC], Technical Area [TA]-V Groundwater [TAVG AOC], and Tijeras Arroyo Groundwater [TAG AOC]). Section I.2.2 summarizes quarterly activities at sites where the New Mexico Environment Department (NMED) Hazardous Waste Bureau (HWB) issued a certificate of completion and the sites are in the corrective action complete (CAC) regulatory process. Currently, SWMUs 8 and 58, 68, 149, 154, and 502 are in the CAC regulatory process. Corrective action activities are deferred at the Long Sled Track (SWMU 83), the Gun Facilities (SWMU 84), and the Short Sled Track (SWMU 240) because these three sites are active mission facilities. These three active mission sites are located in TA-III. This Sandia National Laboratories, New Mexico Environmental Restoration Operations (ER) Consolidated Quarterly Report (ER Quarterly Report) fulfills all quarterly reporting requirements set forth in the Resource Conservation and Recovery Act Facility Operating Permit and the Compliance Order on Consent.

  11. Developing European conservation and mitigation tools for pollination services: approaches of the STEP (Status and Trends of European Pollinators) project

    NARCIS (Netherlands)

    Potts, S.G.; Biesmeijer, J.C.; Bommarco, R.; Felicioli, A.; Fischer, M.; Jokinen, P.; Kleijn, D.; Klein, A.M.; Kunin, W.E.; Neumann, P.; Penev, L.D.; Petanidou, T.; Rasmont, P.; Roberts, S.P.M.; Smith, H.G.; Sorensen, P.B.; Steffan-Dewenter, I.; Vaissiere, B.E.; Vila, M.; Vujic, A.; Woyciechowski, M.; Zobel, M.; Settele, J.; Schweiger, O.

    2011-01-01

    Pollinating insects form a key component of European biodiversity, and provide a vital ecosystem service to crops and wild plants. There is growing evidence of declines in both wild and domesticated pollinators, and parallel declines in plants relying upon them. The STEP project (Status and Trends

  12. Project Radiation Protection East. Swedish cooperation program for radiation protection in Eastern and Central Europe. Status Report, March 1996

    International Nuclear Information System (INIS)

    Snihs, J.O.; Johansson, Mai; Grapengiesser, S.; Bennerstedt, T.

    1996-04-01

    Until now the Swedish program for radiation protection work in central and Eastern europe has been granted 55 MSEK by the Swedish government. The projects are assessed, planned and performed in close cooperation with partner organizations in the East. Since 1994, radiation protection cooperation concerning the former Soviet Navy training reactors in Paldiski, Estonia, is included in Radiation Protection East. The government has granted 8 MSEK for this purpose. This report presents a summary over some 150 projects, their status, allocated funds and their distribution over countries and project areas. The presentation is updated up to March 1996. 7 figs

  13. Ion projection lithography: November 2000 status and sub-70-nm prospects

    Science.gov (United States)

    Kaesmaier, Rainer; Wolter, Andreas; Loeschner, Hans; Schunck, Stefan

    2000-10-01

    Among all next generation lithography (NGL) options Ion Projection Lithography (IPL) offers the smallest (particle) wavelength of 5x10- 5nm (l00keV Helium ions). Thus, 4x reduction ion-optics has diffraction limits IOS) has been realized and assembled. In parallel to the PDT-IOS effort, at Leica Jena a test bench for a vertical vacuum 300mm-wafer stage has been realized. Operation of magnetic bearing supported stage movement has already been demonstrated. As ASML vacuum compatible optical wafer alignment system, with 3nm(3(sigma) ) precision demonstrated in air, has been integrated to this wafer test bench system recently. Parallel to the IPL tool development, Infineon Technologies Mask House and the Institute for Microelectronics Stuttgart are intensively working on the development of IPL stencil masks with success in producing 150mm and 200mm stencil masks as reported elsewhere. This paper is focused on information about the status of the PDT-IOS tool.

  14. Current status and future direction of INPRO (International Project on Innovative Nuclear Reactors and Fuel Cycles)

    International Nuclear Information System (INIS)

    Omoto, Akira; Moriwaki, Masanao; Sugimoto, Jun; Nakai, Ryodai

    2007-01-01

    INPRO is an international forum to consider jointly the international and national actions required to achieve desired innovations in nuclear reactors and fuel cycles so as to ensure that nuclear energy is available to contribute to a sustainable development of the human, and IAEA becomes the secretariat for INPRO. The number of the members counts 28 by recent participation of Japan and U.S.A. now, and it is a unique forum to bring together both technology users and technology holders, that includes 5 countries which do not still have nuclear power generation. Until now it was phase I, and focused its activities to make clear the desired characteristics of nuclear energy system toward the future, and to develop methodology to evaluate various nuclear energy systems, but it shifted to phase II from July, 2006, and it planned three areas of activities such as improvement of evaluation methodology, institutional/infrastructure oriented activities and a collaborative project of technology development. Current status and future direction of INPRO was presented to encourage Japan in significant contributions of these three areas. (T. Tanaka)

  15. THE STATUS OF TOPOGRAPHIC MAPPING IN THE WORLD A UNGGIM–ISPRS PROJECT 2012–2015

    Directory of Open Access Journals (Sweden)

    G. Konecny

    2016-06-01

    Full Text Available In December 2011, UNGGIM initiated a cooperative project with ISPRS to resume the former UN Secretariat studies on the status of topographic mapping in the world, conducted between 1968 and 1986. After the design of a questionnaire with 27 questions, the UNGGIM Secretariat sent the questionnaires to the UN member states. 115 replies were received from the 193 member states and regions thereof. Regarding the global data coverage and age, the UN questionnaire survey was supplemented by data from the Eastview database. For each of the 27 questions, an interactive viewer was programmed permitting the analysis of the results. The authoritative data coverage at the various scale ranges has greatly increased between 1986 and 2012. Now, a 30 % 1 : 25 000 map data coverage and a 75 % 1 : 50 000 map data coverage has been completed. Nevertheless, there is still an updating problem, as data for some countries is 10 to 30 years old. Private Industry, with Google, Microsoft and Navigation system providers, have undertaken huge efforts to supplement authoritative mapping. For critical areas on the globe, MGCP committed to military mapping at 1 : 50 000. ISPRS has decided to make such surveys a sustainable issue by establishing a working group.

  16. The Status of Topographic Mapping in the World a Unggim-Isprs Project 2012-2015

    Science.gov (United States)

    Konecny, G.; Breitkopf, U.; Radtke, A.

    2016-06-01

    In December 2011, UNGGIM initiated a cooperative project with ISPRS to resume the former UN Secretariat studies on the status of topographic mapping in the world, conducted between 1968 and 1986. After the design of a questionnaire with 27 questions, the UNGGIM Secretariat sent the questionnaires to the UN member states. 115 replies were received from the 193 member states and regions thereof. Regarding the global data coverage and age, the UN questionnaire survey was supplemented by data from the Eastview database. For each of the 27 questions, an interactive viewer was programmed permitting the analysis of the results. The authoritative data coverage at the various scale ranges has greatly increased between 1986 and 2012. Now, a 30 % 1 : 25 000 map data coverage and a 75 % 1 : 50 000 map data coverage has been completed. Nevertheless, there is still an updating problem, as data for some countries is 10 to 30 years old. Private Industry, with Google, Microsoft and Navigation system providers, have undertaken huge efforts to supplement authoritative mapping. For critical areas on the globe, MGCP committed to military mapping at 1 : 50 000. ISPRS has decided to make such surveys a sustainable issue by establishing a working group.

  17. Western Gas Sands Project. Status report, 1 August-31 August, 1979

    Energy Technology Data Exchange (ETDEWEB)

    None

    1979-01-01

    This status report summarizes progress of government-sponsored projects directed toward increasing gas production from the low-permeability gas sands of the western United States. Work on fracture conductivity, rock-fluid interaction, and log evaluation and interpretation techniques continued at Bartlesville. Work commenced on completing, testing and possible hydraulic fracturing of the Rio Blanco Natural Gas Company well No. 397-19-1 and on the evaluation of seismic data for stratigraphic studies of lenticular sands. LLL continued experimental and theoretical work on hydraulic fracturing mechanics and analysis of well test data. LASL worked on developing NMR methods to define fluid saturation, porosity, and permeability of western gas sands at in situ conditions. M.D. Wood, Inc. was involved in design and site preparation for two hydraulic fracture mapping jobs in the Cotton Valley Trend in Texas. Testing and analyses of the borehole seismic system and borehole hydrophone system continued at Sandia. Field tests and related activities for the WGSP progressed as scheduled in August. Cyclic injection of dehydrated natural gas and production in Colorado Interstate Gas Company's Miller No. 1 and Sprague No. 1 wells continued. The Gas Producing Enterprises, Inc. wells, Natural Buttes Units 9, 14, 18 and 20 flowed to sales. The Mitchell Energy Corporation Muse-Duke No. 1 was shut-in for a 15-day pressure buildup test. Hydraulic fracture containment experiments and activities in the multi-frac test series continued at the Nevada Test Site for Sandia Laboratories' mineback program.

  18. Reactivation of nuclear power plant construction projects. Plant status, policy issues and regulatory options

    International Nuclear Information System (INIS)

    Spangler, M.B.

    1986-07-01

    Prior to the TMI-2 accident on March 28, 1979, four nuclear power plant units that had previously been issued a construction permit were cancelled, principally because of reduced projections of regional power demand. Since that time, an additional 31 units with CPs have been cancelled and eight units deferred. On December 23, 1985 one of the deferred units (Limerick-2) was reactivated and construction resumed. The primary objective of this policy study is to identify the principal issues requiring office-level consideration in the event of reactivation of the construction of one or more of the nuclear power plants falling into two categories: (1) LWR units issued a construction permit whose construction has been cancelled, and (2) LWR units whose construction has been deferred. The study scope is limited to identifying regulatory issues or questions deserving analysis rather than providing, at this time, answers or recommended actions. Five tasks are addressed: a tabulation and discussion of the status of all cancelled and deferred LWR units; and identification of potential safety and environmental issues; an identification of regulatory or policy issues and needed information to determine the desirability of revising certain rules and policies; and identification of regulatory options and decision criteria; and an identification of decision considerations in determining staff requirements and organizational coordination of LWR reactivation policy and implementation efforts. 41 refs

  19. (Shippingport Atomic Power Station). Quarterly operating report, third quarter 1980

    Energy Technology Data Exchange (ETDEWEB)

    Zagorski, J. F.

    1980-01-01

    At the beginning of the third quarter of 1980, the Shippingport Atomic Power Station was operating with the 1A, 1B, 1C, and 1D reactor coolant loops and the 1AC and 1BD purification loops in service. During the quarter, the Station was operated for Duquesne Light Company System grid including base load and swing load operation. Twelve (12) planned swing load operations were performed on the LWBR Core this quarter to complete the LWBR operating plan of fifty (50) during this operating phase. The Station was shutdown on September 12 for the Fall 1980 Shutdown and remained in this mode through the end of the quarter. The LWBR Core has generated 18,297.98 EFPH from start-up through the end of the quarter. There were no radioactive liquid discharges from the Radioactive Waste Processing System to the river this quarter. The radioactive liquid waste effluent line to the river remained blanked off to prevent inadvertent radioactive liquid waste discharges. During the quarter, approximately 0.001 curies of Xe 133 activity were released from the station. The radioactivity released from Shippingport Station is far too small to have any measurable effect on the general background environmental radioactivity outside the plant.

  20. Fast Breeder Project. Second quarterly report, 1974

    International Nuclear Information System (INIS)

    Hueper, R.

    Research progress is reported on fuel pin development, material studies and development, corrosion tests and coolant analysis, fuel cycle studies, physics experiments, fast reactor safety, instrumentation development, environmental studies, and sodium technology tests. Much of the work had SNR-300 design applications. (U.S.)

  1. Imperial Valley Environmental Project: quarterly data report

    Energy Technology Data Exchange (ETDEWEB)

    Nyholm, R.A.; Anspaugh, L.R. (comps.)

    1977-04-13

    This is a catalog of all samples which have been collected and the presently available results of chemical and other analyses. Types covered include: air quality, water quality, ecosystem quality, subsidence and seismicity, remotely sensed data, socioeconomic effects, and measurements of radioactivity. (MHR)

  2. Status Review of Wildlife Mitigation at 14 of 27 Major Hydroelectric Projects in Idaho, 1983-1984 Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Martin, Robert C.; Mehrhoff, L.A.

    1985-01-01

    The Pacific Northwest Electric Power Planning and Conservation Act and wildlife and their habitats in the Columbia River Basin and to compliance with the Program, the wildlife mitigation status reports coordination with resource agencies and Indian Tribes. developed the Columbia River Basin Fish and Wildlife Program development, operation, and maintenance of hydroelectric projects on existing agreements; and past, current, and proposed wildlife factual review and documentation of existing information on wildlife meet the requirements of Measure 1004(b)(l) of the Program. The mitigation, enhancement, and protection activities were considered. In mitigate for the losses to those resources resulting from the purpose of these wildlife mitigation status reports is to provide a resources at some of the Columbia River Basin hydroelectric projects the river and its tributaries. To accomplish this goal, the Council were written with the cooperation of project operators, and in within Idaho.

  3. Cornell Hospitality Quarterly

    OpenAIRE

    Wan, Yang; Lu, Zhang; Anna, S. Mattila

    2016-01-01

    As an emerging distribution channel, online discount websites are gaining popularity among luxury hotels. However, little guidance on the effectiveness of such price promotions in luxury hotels is provided in the extant literature. Building on the status consumption theories, we examine the joint effects of price promotions and need for status (NFS) on consumers’ attitudes toward the hotel as well as their intentions to return. 82-92.

  4. 94-1 Research and Development Project Lead laboratory support. Status report, October 1--December 31, 1995

    Energy Technology Data Exchange (ETDEWEB)

    Dinehart, M. [comp.

    1996-05-01

    This is a quarterly progress report of the 94-1 Research and Development Lead Laboratory Support Technical Program Plan for the first quarter of FY 1996. The report provides details concerning descriptions, DOE-complex-wide material stabilization technology needs, scientific background and approach, progress, benefits to the DOE complex, and collaborations for selected subprojects. An executive summary and report on end-of-quarter spending is included.

  5. 94-1 Research and Development Project Lead laboratory support. Status report, October 1--December 31, 1995

    International Nuclear Information System (INIS)

    Dinehart, M.

    1996-05-01

    This is a quarterly progress report of the 94-1 Research and Development Lead Laboratory Support Technical Program Plan for the first quarter of FY 1996. The report provides details concerning descriptions, DOE-complex-wide material stabilization technology needs, scientific background and approach, progress, benefits to the DOE complex, and collaborations for selected subprojects. An executive summary and report on end-of-quarter spending is included

  6. New York State Energy Research and Development Authority. Research projects` update project status as of March 31, 1997

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-07-01

    This report provides an update of the New York State Energy Research and Development Authority (NYSERDA) program. The NYSERDA research and development program has five major areas: industry, buildings, energy resources, transportation, and environment. NYSERDA organizes projects within these five major areas based on energy use and supply, and end-use sectors. Therefore, issues such as waste management, energy products and renewable energy technologies are addressed in several areas of the program. The project descriptions presented are organized within the five program areas. Descriptions of projects completed between the period April 1, 1996, and March 31, 1997, including technology-transfer activities, are at the end of each subprogram section.

  7. Which territorial integration of participative renewable energies? Present status and analysis of French projects. Final report

    International Nuclear Information System (INIS)

    Devisse, Jean-Stephane; Gilbert, Olivier; Reix, Fabien; GASPARD, Albane

    2016-02-01

    This study aimed at qualifying actors involved in projects (stakeholders, motivations, who decides what and how), at identifying the available resources (technical and financial abilities, project management abilities), at describing the mobilisation work and territorial dialogue processes, and at exploring how benefit distribution contributes to territorial dynamics. This study first identified participative renewable energy projects in France. A survey by questionnaire was then performed among project holders. Six projects have also been more deeply studied (a mix of solar and photovoltaic and wind energy, two wind farms located in two different regions, a solar photovoltaic project, a hydroelectric project, and a project on biomass from forest). After the methodology, the report defines what a participative renewable energy project is, proposes an overview of these projects in 2015, present the case studies, and proposes an analysis on the different aspects of the project process

  8. Shippingport Atomic Power Station. Quarterly operating report, third quarter 1978

    Energy Technology Data Exchange (ETDEWEB)

    Jones, T. D.

    1978-01-01

    A loss of ac power to the station occurred on July 28, 1978 caused by an interaction between Beaver Valley Power Station and Shippingport Atomic Power Station when the main transformer of Unit No. 1 of the Beaver Valley Power Station developed an internal failure and tripped the BVPS. Two environmental studies were continued this quarter. The first involves reduction of main unit condenser chlorination and the second, river intake screen fish impingement sampling. There were no radioactive liquid discharges from the Radioactive Waste Processing System to the river this quarter. During the third quarter of 1978, 874 cubic feet of radioactive solid waste was shipped out of state for burial. At the end of the quarter, the Fall shutdown continued with the plant heated up, the main turbine on turning gear and plant testing in progress prior to Station startup.

  9. Environmental Restoration Operations Consolidated Quarterly Report: July-September 2016

    Energy Technology Data Exchange (ETDEWEB)

    Cochran, John R. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2017-01-01

    This Environmental Restoration Operations (ER) Consolidated Quarterly Report (ER Quarterly Report) provides the status of ongoing corrective action activities being implemented at Sandia National Laboratories, New Mexico (SNL/NM) during the July, August, and September 2016 quarterly reporting period. The Solid Waste Management Units (SWMUs) and Areas of Concern (AOCs) identified for corrective action at SNL/NM are listed in Table I-1. Sections I.2.1 and I.2.2 summarize the work completed during this quarter. Section I.2.1 summarizes the quarterly activities at sites undergoing corrective action field activities. Field activities are conducted at the three groundwater AOCs (Burn Site Groundwater [BSG AOC], Technical Area [TA]-V Groundwater [TAVG AOC], and Tijeras Arroyo Groundwater [TAG AOC]). Section I.2.2 summarizes quarterly activities at sites where the New Mexico Environment Department (NMED) issued a certificate of completion and the sites are in the corrective action complete (CAC) regulatory process. Currently, SWMUs 8 and 58, 68, 149, 154, and 502 are in the CAC regulatory process. Corrective action activities are deferred at the Long Sled Track (SWMU 83), the Gun Facilities (SWMU 84), and the Short Sled Track (SWMU 240) because these three sites are active mission facilities. These three active sites are located in TA-III.

  10. Wind/photovoltaic power indicators. Fourth quarter 2009; Tableau de bord eolien-photovoltaique. Quatrieme trimestre 2009

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2010-02-15

    This document makes a quarterly status of the power generation from wind and photovoltaic power plants connected to the French grid (continental France, Corsica and overseas territories): total connected load, quarterly connected load during the last years, power generated since the beginning of the year, progress trend of wind and photovoltaic power in France, regional status. (J.S.)

  11. Wind/photovoltaic power indicators. Third quarter 2010; Tableau de bord eolien-photovoltaique. troisieme trimestre 2010

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2010-07-01

    This document makes a quarterly status of the power generation from wind and photovoltaic power plants connected to the French grid (continental France, Corsica and overseas territories): total connected load, quarterly connected load during the last years, power generated since the beginning of the year, progress trend of wind and photovoltaic power in France, regional status. (J.S.)

  12. Wind/photovoltaic power indicators. Second quarter 2011; Tableau de bord eolien-photovoltaique. Deuxieme trimestre 2011

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2011-07-01

    This document makes a quarterly status of the power generation from wind and photovoltaic power plants connected to the French grid (continental France, Corsica and overseas territories): total connected load, quarterly connected load during the last years, power generated since the beginning of the year, progress trend of wind and photovoltaic power in France, regional status. (J.S.)

  13. Wind/photovoltaic power indicators. Third quarter 2009; Tableau de bord eolien-photovoltaique. troisieme trimestre 2009

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2009-11-15

    This document makes a quarterly status of the power generation from wind and photovoltaic power plants connected to the French grid (continental France, Corsica and overseas territories): total connected load, quarterly connected load during the last years, power generated since the beginning of the year, progress trend of wind and photovoltaic power in France, regional status. (J.S.)

  14. Wind/photovoltaic power indicators. Second quarter 2009; Tableau de bord eolien-photovoltaique. Deuxieme trimestre 2009

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2009-09-15

    This document makes a quarterly status of the power generation from wind and photovoltaic power plants connected to the French grid (continental France, Corsica and overseas territories): total connected load, quarterly connected load during the last years, power generated since the beginning of the year, progress trend of wind and photovoltaic power in France, regional status. (J.S.)

  15. Wind/photovoltaic power indicators. First quarter 2011; Tableau de bord eolien-photovoltaique. Premier trimestre 2011

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2011-07-01

    This document makes a quarterly status of the power generation from wind and photovoltaic power plants connected to the French grid (continental France, Corsica and overseas territories): total connected load, quarterly connected load during the last years, power generated since the beginning of the year, progress trend of wind and photovoltaic power in France, regional status. (J.S.)

  16. Wind/photovoltaic power indicators. Second quarter 2010; Tableau de bord eolien-photovoltaique. Deuxieme trimestre 2010

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2010-07-01

    This document makes a quarterly status of the power generation from wind and photovoltaic power plants connected to the French grid (continental France, Corsica and overseas territories): total connected load, quarterly connected load during the last years, power generated since the beginning of the year, progress trend of wind and photovoltaic power in France, regional status. (J.S.)

  17. Wind/photovoltaic power indicators. First quarter 2010; Tableau de bord eolien-photovoltaique. Premier trimestre 2010

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2010-07-01

    This document makes a quarterly status of the power generation from wind and photovoltaic power plants connected to the French grid (continental France, Corsica and overseas territories): total connected load, quarterly connected load during the last years, power generated since the beginning of the year, progress trend of wind and photovoltaic power in France, regional status. (J.S.)

  18. Wind/photovoltaic power indicators. Fourth quarter 2010; Tableau de bord eolien-photovoltaique. Quatrieme trimestre 2010

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2011-07-01

    This document makes a quarterly status of the power generation from wind and photovoltaic power plants connected to the French grid (continental France, Corsica and overseas territories): total connected load, quarterly connected load during the last years, power generated since the beginning of the year, progress trend of wind and photovoltaic power in France, regional status. (J.S.)

  19. The international project on innovative nuclear reactors and fuel cycles (INPRO) - status and trends

    International Nuclear Information System (INIS)

    Gowin, Peter J.; Beatty, Randy L.

    2010-01-01

    The International Project on Innovative Nuclear Reactors and Fuel Cycles (INPRO) was initiated in 2000. As of April 2010, INPRO has 31 members and is implementing activities in five programme areas: A: Nuclear Energy System Assessments (NESA) using the INPRO Methodology Assisting Member States in performing Nuclear Energy System Assessments (NESA) using the INPRO methodology, in support of long-term strategic planning and nuclear energy deployment decision making. B: Global Vision Developing global and regional nuclear energy scenarios, on the basis of a scientific-technical pathway analysis, that lead to a global vision on sustainable nuclear energy development in the 21. century, and supporting Member States in working towards that vision. C: Innovations in Nuclear Technology Fostering collaboration among INPRO Member States on selected innovative nuclear technologies and related R and D that contribute to sustainable nuclear energy. D: Innovations in Institutional Arrangements Investigating and fostering collaboration on innovative institutional and legal arrangements for the use of innovative nuclear systems in the 21. century and supporting Member States in developing and implementing such innovative arrangements. E: INPRO Dialogue Forum Bringing together technology holders and technology users to discuss, debate and share information on desirable innovations, both technical and institutional, but also national long-term nuclear planning strategies and approaches and, on the highest level, the global nuclear energy system. The paper presents main INPRO achievements to date, the current status of activities in these five programme areas and recent INPRO publications, in particular in support of nuclear energy system assessments (NESA) using the INPRO methodology. (authors)

  20. Status of volcanism studies for the Yucca Mountain Site Characterization Project

    Energy Technology Data Exchange (ETDEWEB)

    Crowe, B.; Perry, F.; Murrell, M.; Poths, J.; Valentine, G.A. [Los Alamos National Lab., NM (United States); Wells, S. [Univ. of California, Riverside, CA (United States); Bowker, L.; Finnegan, K. [Univ. of Nevada, Las Vegas, NV (United States); Geissman, J.; McFadden, L.

    1995-02-01

    Chapter 1 introduces the volcanism issue for the Yucca Mountain site and provides the reader with an overview of the organization, content, and significant conclusions of this report. The risk of future basaltic volcanism is the primary topic of concern including both events that intersect a potential repository and events that occur near or within the waste isolation system of a repository. Chapter 2 describes the volcanic history of the Yucca Mountain region (YMR) and emphasizes the Pliocene and Quaternary volcanic record, the interval of primary concern for volcanic risk assessment. The Lathrop Wells volcanic center is described in detail because it is the youngest basalt center in the YMR. Chapter 3 describes the tectonic setting of the YMR and presents and assesses the significance of multiple alternative tectonic models. Geophysical data are described for the YMR and are used as an aid to understand the distribution of basaltic volcanic centers. Chapter 4 discusses the petrologic and geochemical features of basaltic volcanism in the YMR, the southern Great Basin and the Basin and Range province. The long time of activity and characteristic small volume of the Postcaldera basalt of the YMR result in one of the lowest eruptive rates in a volcanic field in the southwest United States. Chapter 5 summarizes current concepts of the segregation, ascent, and eruption of basalt magma. Chapter 6 summarizes the history of volcanism studies (1979 through early 1994), including work for the Yucca Mountain Site Characterization Project and overview studies by the state of Nevada and the Nuclear Regulatory Commission. Chapter 7 summarizes probabilistic volcanic hazard assessment using a three-part conditional probability model. Chapter 8 describes remaining volcanism work judged to be needed to complete characterization studies for the YMR. Chapter 9 summarizes the conclusions of this volcanism status report.

  1. Radiotherapy infrastructure and human resources in Switzerland : Present status and projected computations for 2020.

    Science.gov (United States)

    Datta, Niloy Ranjan; Khan, Shaka; Marder, Dietmar; Zwahlen, Daniel; Bodis, Stephan

    2016-09-01

    The purpose of this study was to evaluate the present status of radiotherapy infrastructure and human resources in Switzerland and compute projections for 2020. The European Society of Therapeutic Radiation Oncology "Quantification of Radiation Therapy Infrastructure and Staffing" guidelines (ESTRO-QUARTS) and those of the International Atomic Energy Agency (IAEA) were applied to estimate the requirements for teleradiotherapy (TRT) units, radiation oncologists (RO), medical physicists (MP) and radiotherapy technologists (RTT). The databases used for computation of the present gap and additional requirements are (a) Global Cancer Incidence, Mortality and Prevalence (GLOBOCAN) for cancer incidence (b) the Directory of Radiotherapy Centres (DIRAC) of the IAEA for existing TRT units (c) human resources from the recent ESTRO "Health Economics in Radiation Oncology" (HERO) survey and (d) radiotherapy utilization (RTU) rates for each tumour site, published by the Ingham Institute for Applied Medical Research (IIAMR). In 2015, 30,999 of 45,903 cancer patients would have required radiotherapy. By 2020, this will have increased to 34,041 of 50,427 cancer patients. Switzerland presently has an adequate number of TRTs, but a deficit of 57 ROs, 14 MPs and 36 RTTs. By 2020, an additional 7 TRTs, 72 ROs, 22 MPs and 66 RTTs will be required. In addition, a realistic dynamic model for calculation of staff requirements due to anticipated changes in future radiotherapy practices has been proposed. This model could be tailor-made and individualized for any radiotherapy centre. A 9.8 % increase in radiotherapy requirements is expected for cancer patients over the next 5 years. The present study should assist the stakeholders and health planners in designing an appropriate strategy for meeting future radiotherapy needs for Switzerland.

  2. Radiotherapy infrastructure and human resources in Switzerland. Present status and projected computations for 2020

    International Nuclear Information System (INIS)

    Datta, Niloy Ranjan; Khan, Shaka; Marder, Dietmar; Zwahlen, Daniel; Bodis, Stephan

    2016-01-01

    The purpose of this study was to evaluate the present status of radiotherapy infrastructure and human resources in Switzerland and compute projections for 2020. The European Society of Therapeutic Radiation Oncology ''Quantification of Radiation Therapy Infrastructure and Staffing'' guidelines (ESTRO-QUARTS) and those of the International Atomic Energy Agency (IAEA) were applied to estimate the requirements for teleradiotherapy (TRT) units, radiation oncologists (RO), medical physicists (MP) and radiotherapy technologists (RTT). The databases used for computation of the present gap and additional requirements are (a) Global Cancer Incidence, Mortality and Prevalence (GLOBOCAN) for cancer incidence (b) the Directory of Radiotherapy Centres (DIRAC) of the IAEA for existing TRT units (c) human resources from the recent ESTRO ''Health Economics in Radiation Oncology'' (HERO) survey and (d) radiotherapy utilization (RTU) rates for each tumour site, published by the Ingham Institute for Applied Medical Research (IIAMR). In 2015, 30,999 of 45,903 cancer patients would have required radiotherapy. By 2020, this will have increased to 34,041 of 50,427 cancer patients. Switzerland presently has an adequate number of TRTs, but a deficit of 57 ROs, 14 MPs and 36 RTTs. By 2020, an additional 7 TRTs, 72 ROs, 22 MPs and 66 RTTs will be required. In addition, a realistic dynamic model for calculation of staff requirements due to anticipated changes in future radiotherapy practices has been proposed. This model could be tailor-made and individualized for any radiotherapy centre. A 9.8 % increase in radiotherapy requirements is expected for cancer patients over the next 5 years. The present study should assist the stakeholders and health planners in designing an appropriate strategy for meeting future radiotherapy needs for Switzerland. (orig.) [de

  3. A randomized controlled evaluation of the tobacco status project, a Facebook intervention for young adults.

    Science.gov (United States)

    Ramo, Danielle E; Thrul, Johannes; Delucchi, Kevin L; Hall, Sharon; Ling, Pamela M; Belohlavek, Alina; Prochaska, Judith J

    2018-05-24

    To test the efficacy of the Tobacco Status Project (TSP) Facebook smoking cessation intervention for young adults relative to referral to an on-line program on biochemically verified 7-day abstinence from smoking. Two-group parallel randomized controlled trial, comparing TSP (n = 251) to on-line control (n = 249) with follow-up to 12 months. On-line, throughout the United States. Young adult cigarette smokers (mean age 21 years; 73% white, 55% female, 87% daily smokers). TSP provided private Facebook groups tailored to stage of change to quit smoking, daily contacts, weekly live counseling sessions, and for those ready to quit, six cognitive behavioral therapy counseling sessions. Some TSP groups were assigned randomly to receive a monetary incentive for engagement. Control provided referral to the National Cancer Institute Smokefree.gov website. PRIMARY OUTCOME: Biochemically verified 7-day abstinence over 12 months. Post-treatment (3-month) abstinence; reported abstinence, quit attempt, reduction in smoking, readiness to quit smoking over 12 months. Verified 7-day abstinence was not significantly different for intervention compared with control over 1 year: month 3 (8.3 versus 3.2%), 6 (6.2 versus 6.0%), and 12 (5.9 versus 10.0%); odds ratio (OR) = 1.07; 95% confidence interval (CI) = 0.23, 4.97; retention = 71%. There was an effect at 3 months (OR = 2.52; CI = 1.56, 4.04; P Facebook smoking cessation intervention did not improve abstinence from smoking over 1 year, but increased abstinence at the end of treatment and was engaging to participants. © 2018 Society for the Study of Addiction.

  4. The Carolina Bay Restoration Project - Status Report II 2000-2004.

    Energy Technology Data Exchange (ETDEWEB)

    Barton, Christopher

    2006-07-13

    A Wetlands Mitigation Bank was established at SRS in 1997 as a compensatory alternative for unavoidable wetland losses. Prior to restoration activities, 16 sites included in the project were surveyed for the SRS Site Use system to serve as a protective covenant. Pre-restoration monitoring ended in Fall 2000, and post restoration monitoring began in the Winter/Spring of 2001. The total interior harvest in the 16 bays after harvesting the trees was 19.6 ha. The margins in the opencanopy, pine savanna margin treatments were thinned. Margins containing areas with immature forested stands (bay 5184 and portions of bay 5011) were thinned using a mechanical shredder in November 2001. Over 126 hectares were included in the study areas (interior + margin). Planting of two tree species and the transplanting of wetland grass species was successful. From field surveys, it was estimated that approximately 2700 Nyssa sylvatica and 1900 Taxodium distichum seedlings were planted in the eight forested bays resulting in an average planting density of ≈ 490 stems ha-1. One hundred seedlings of each species per bay (where available) were marked to evaluate survivability and growth. Wetland grass species were transplanted from donor sites on SRS to plots that ranged in size from 100 – 300 m2, depending on wetland size. On 0.75 and 0.6 meter centers, respectively, 2198 plugs of Panicum hemitomon and 3021 plugs Leersia hexandra were transplanted. New shoots originating from the stumps were treated with a foliar herbicide (Garlon® 4) during the summer of 2001 using backpack sprayers. Preliminary information from 2000-2004 regarding the hydrologic, vegetation and faunal response to restoration is presented in this status report. Post restoration monitoring will continue through 2005. A final report to the Mitigation Bank Review Team will be submitted in mid-2006.

  5. Status of volcanism studies for the Yucca Mountain Site Characterization Project

    International Nuclear Information System (INIS)

    Crowe, B.; Perry, F.; Murrell, M.; Poths, J.; Valentine, G.A.; Wells, S.; Bowker, L.; Finnegan, K.; Geissman, J.; McFadden, L.

    1995-02-01

    Chapter 1 introduces the volcanism issue for the Yucca Mountain site and provides the reader with an overview of the organization, content, and significant conclusions of this report. The risk of future basaltic volcanism is the primary topic of concern including both events that intersect a potential repository and events that occur near or within the waste isolation system of a repository. Chapter 2 describes the volcanic history of the Yucca Mountain region (YMR) and emphasizes the Pliocene and Quaternary volcanic record, the interval of primary concern for volcanic risk assessment. The Lathrop Wells volcanic center is described in detail because it is the youngest basalt center in the YMR. Chapter 3 describes the tectonic setting of the YMR and presents and assesses the significance of multiple alternative tectonic models. Geophysical data are described for the YMR and are used as an aid to understand the distribution of basaltic volcanic centers. Chapter 4 discusses the petrologic and geochemical features of basaltic volcanism in the YMR, the southern Great Basin and the Basin and Range province. The long time of activity and characteristic small volume of the Postcaldera basalt of the YMR result in one of the lowest eruptive rates in a volcanic field in the southwest United States. Chapter 5 summarizes current concepts of the segregation, ascent, and eruption of basalt magma. Chapter 6 summarizes the history of volcanism studies (1979 through early 1994), including work for the Yucca Mountain Site Characterization Project and overview studies by the state of Nevada and the Nuclear Regulatory Commission. Chapter 7 summarizes probabilistic volcanic hazard assessment using a three-part conditional probability model. Chapter 8 describes remaining volcanism work judged to be needed to complete characterization studies for the YMR. Chapter 9 summarizes the conclusions of this volcanism status report

  6. The international project on innovative nuclear reactors and fuel cycles (INPRO): status and outlook

    International Nuclear Information System (INIS)

    Steur, R.; Kupitz, J.; Depisch, F.

    2004-01-01

    Full text: During the last fifty years remarkable results are achieved in the application of nuclear technology for the production of electricity. Looking ahead to the next fifty years it is clear that the demand for energy will grow considerably and also new requirements for the way the energy will be supplied have to be fulfilled. Following a resolution of the General Conference of the IAEA in the year 2000 an International Project on Innovative Nuclear Reactors and Fuel Cycles, referred to as INPRO, was initiated. The main objectives of INPRO are to: Help to ensure that nuclear energy is available to contribute in fulfilling energy needs in the 21st century in a sustainable manner; and Bring together both technology holders and technology users to consider jointly the international and national actions required to achieve desired innovations in nuclear reactors and fuel cycles. Within INPRO the future of the energy demand and supply was explored and several scenario's identified. A leading requirement for energy supply is coming up and will play a crucial role: sustainability of the way the energy supply will be realized. Fulfilling the growing need for energy in developing countries is as well an important issue. Based on these scenario's for the next fifty years, requirements for the different aspects of the future of nuclear energy systems, such as economics, sustain ability and environment, safety, waste and proliferation resistance have been identified as well a methodology developed. to assess innovative nuclear systems and fuel cycles. On the base of this assessment, the need for innovations and breakthroughs in existing technology can be defined. To facilitate the deployment of innovative nuclear systems also different aspects of the infrastructure, technical as well institutional have been reviewed and recommendations for changes are made to anticipate main developments in the world such as the ongoing globalisation. As a contribution to the conference

  7. NST Quarterly. July 1996 issue

    International Nuclear Information System (INIS)

    1996-01-01

    NST Quarterly reports current development in Nuclear Science and Technology in Malaysia. In this issue it highlights MINT activities in in-vitro mutagenesis of ornamental plants, soil erosion studies and animal feed production from agricultural waste

  8. NST Quarterly - January 1998 issue

    International Nuclear Information System (INIS)

    1998-01-01

    NST Quarterly reports current development in Nuclear Science and Technology in Malaysia. In this issue it highlights MINT activities in proposal of national networking for biotechnology culture collection centre (NNBCCC)

  9. NST Quarterly. October 1996 issue

    International Nuclear Information System (INIS)

    1996-01-01

    NST Quarterly reports current development in Nuclear Science and Technology in Malaysia. In this issue it highlights MINT activities in latex vulcanization (first RVNRL-based rubber gloves produced in Malaysia), tank floor scanning system (TAFLOSS), incineration and radiotherapeutic agent

  10. NST Quarterly - issue January 2002

    International Nuclear Information System (INIS)

    2002-01-01

    NST Quarterly reports current development in Nuclear Science and Technology in Malaysia. The subjects discussed are i. food and drinking water which are the major pathways of radionuclides to man and ii. nuclear techniques help to monitor sedimentation in reservoir

  11. NST Quarterly - April 1998 issue

    International Nuclear Information System (INIS)

    1998-01-01

    NST Quarterly reports current development in Nuclear Science and Technology in Malaysia. In this issue it highlights MINT activities in ionizing radiation as an alternative method for sanitization of herbs and spices

  12. W-519 Sagebrush Mitigation Project FY-2004 Final Review and Status

    Energy Technology Data Exchange (ETDEWEB)

    Durham, Robin E.; Sackschewsky, Michael R.

    2004-09-30

    This report summarizes activities conducted as mitigation for loss of sagebrush-steppe habitats due to Project W-519, the construction of the infrastructure for the Tank Waste Remediation System Vitrification Plant. The focus of this report is to provide a review and final status of mitigation actions performed through FY2004. Data collected since FY1999 have been included where appropriate. The Mitigation Action Plan (MAP) for Project W-519 prescribed three general actions to be performed as mitigation for the disturbance of approximately 40 ha (100 acres) of mature sagebrush-steppe habitat. These actions included: (1) transplanting approximately 130,000 sagebrush seedlings on the Fitzner-Eberhardt Arid Lands Ecology Reserve (ALE); (2) rectification of the new transmission line corridor via seeding with native grasses and sagebrush; and (3) research on native plant species with a goal of increasing species diversity in future mitigation or restoration actions. Nearly 130,000 Wyoming big sagebrush seedlings where planted on ALE during FY2000 and FY2001. About 39,000 of those seedlings were burned during the 24-Command Fire of June 2000. The surviving and subsequent replanting has resulted in about 91,000 seedlings that were planted across four general areas on ALE. A 50% survival rate at any monitoring period was defined as the performance standard in the MAP for this project. Data collected in 2004 indicate that of the over 5000 monitored plants, 51.1% are still alive, and of those the majority are thriving and blooming. These results support the potential for natural recruitment and the ultimate goal of wildlife habitat replacement. Thus, the basic performance standard for sagebrush survival within the habitat compensation planting has been met. Monitoring activities conducted in 2004 indicate considerable variation in seedling survival depending on the type of plant material, site conditions, and to a lesser extent, treatments performed at the time of planting

  13. W-519 Sagebrush Mitigation Project FY-2004 Final Review and Status

    International Nuclear Information System (INIS)

    Durham, Robin E.; Sackschewsky, Michael R.

    2004-01-01

    This report/SUMmarizes activities conducted as mitigation for loss of sagebrush-steppe habitats due to Project W-519, the construction of the infrastructure for the Tank Waste Remediation System Vitrification Plant. The focus of this report is to provide a review and final status of mitigation actions performed through FY2004. Data collected since FY1999 have been included where appropriate. The Mitigation Action Plan (MAP) for Project W-519 prescribed three general actions to be performed as mitigation for the disturbance of approximately 40 ha (100 acres) of mature sagebrush-steppe habitat. These actions included: (1) transplanting approximately 130,000 sagebrush seedlings on the Fitzner-Eberhardt Arid Lands Ecology Reserve (ALE); (2) rectification of the new transmission line corridor via seeding with native grasses and sagebrush; and (3) research on native plant species with a goal of increasing species diversity in future mitigation or restoration actions. Nearly 130,000 Wyoming big sagebrush seedlings where planted on ALE during FY2000 and FY2001. About 39,000 of those seedlings were burned during the 24-Command Fire of June 2000. The surviving and subsequent replanting has resulted in about 91,000 seedlings that were planted across four general areas on ALE. A 50% survival rate at any monitoring period was defined as the performance standard in the MAP for this project. Data collected in 2004 indicate that of the over 5000 monitored plants, 51.1% are still alive, and of those the majority are thriving and blooming. These results support the potential for natural recruitment and the ultimate goal of wildlife habitat replacement. Thus, the basic performance standard for sagebrush survival within the habitat compensation planting has been met. Monitoring activities conducted in 2004 indicate considerable variation in seedling survival depending on the type of plant material, site conditions, and to a lesser extent, treatments performed at the time of planting

  14. Current status and perspective of advanced loop type fast reactor in fast reactor cycle technology development project

    International Nuclear Information System (INIS)

    Niwa, Hajime; Aoto, Kazumi; Morishita, Masaki

    2007-01-01

    After selecting the combination of the sodium-cooled fast reactor (SFR) with oxide fuel, the advanced aqueous reprocessing and the simplified pelletizing fuel fabrication as the most promising concept of FR cycle system, 'Feasibility Study on Commercialized Fast Reactor Cycle Systems' was finalized in 2006. Instead, a new project, Fast Reactor Cycle Technology Development Project (FaCT Project) was launched in Japan focusing on development of the selected concepts. This paper describes the current status and perspective of the advanced loop type SFR system in the FaCT Project, especially on the design requirements, current design as well as the related innovative technologies together with the development road-map. Some considerations on advantages of the advanced loop type design are also described. (authors)

  15. Status of groundwater quality in the Coastal Los Angeles Basin, 2006-California GAMA Priority Basin Project

    Science.gov (United States)

    Goldrath, Dara; Fram, Miranda S.; Land, Michael; Belitz, Kenneth

    2012-01-01

    Groundwater quality in the approximately 860-square-mile (2,227-square-kilometer) Coastal Los Angeles Basin study unit (CLAB) was investigated as part of the Priority Basin Project of the Groundwater Ambient Monitoring and Assessment (GAMA) Program. The study area is located in southern California in Los Angeles and Orange Counties. The GAMA Priority Basin Project is being conducted by the California State Water Resources Control Board in collaboration with the U.S. Geological Survey (USGS) and the Lawrence Livermore National Laboratory. The GAMA CLAB study was designed to provide a spatially unbiased assessment of the quality of untreated (raw) groundwater in the primary aquifer system. The assessment is based on water-quality and ancillary data collected in 2006 by the USGS from 69 wells and on water-quality data from the California Department of Public Health (CDPH) database. The primary aquifer system was defined by the depth interval of the wells listed in the CDPH database for the CLAB study unit. The quality of groundwater in the primary aquifer system may be different from that in the shallower or deeper water-bearing zones; shallow groundwater may be more vulnerable to surficial contamination. This study assesses the status of the current quality of the groundwater resource by using data from samples analyzed for volatile organic compounds (VOCs), pesticides, and naturally occurring inorganic constituents, such as major ions and trace elements. This status assessment is intended to characterize the quality of groundwater resources in the primary aquifer system of the CLAB study unit, not the treated drinking water delivered to consumers by water purveyors. Relative-concentrations (sample concentration divided by the health- or aesthetic-based benchmark concentration) were used for evaluating groundwater quality for those constituents that have Federal and (or) California regulatory or non-regulatory benchmarks for drinking-water quality. A relative

  16. Air Traffic Control: Status of FAA's Implementation of the Display System Replacement Project

    National Research Council Canada - National Science Library

    1999-01-01

    ...) implementation of the Display System Replacement (DSR) project. DSR, which replaces the controllers' workstations and other equipment in the nation's en route centers, is one of FAA's major projects under the air traffic control modernization program...

  17. Status of projects using reject heat for aquaculture and horticulture at power plants in the EEC

    International Nuclear Information System (INIS)

    Aston, R.J.

    1988-08-01

    Data collected mainly from an inventory of waste heat projects in the EEC prepared by Potentiel Energie of Paris covers 46 projects approximately half of which are fish farms and half horticultural projects mainly in the form of greenhouses. About a half of the projects are run on a commercial basis while the other half are Research and Development (R and D) or demonstrations. At least 18 species of fish and 18 species of plant are produced at the various projects but eels and potted plants are grown at more of the commercially orientated projects than any other produce. There has been a significant increase in the number of commercially run projects during the past 10-15 years and this trend is likely to continue in view of the considerable savings that can be made on fuel. The size and number of commercial projects in the UK compares favourably with those in other EEC countries. (author)

  18. ARRA NEPA Quarterly Report- Second Report: DOL

    Data.gov (United States)

    Council on Environmental Quality, Executive Office of the President — Reports prepared by the Departments and Agencies on status of NEPA progress for activities and projects funded under Division A of the American Recovery and...

  19. ARRA NEPA Quarterly Report- First Report: USAID

    Data.gov (United States)

    Council on Environmental Quality, Executive Office of the President — Reports prepared by the Departments and Agencies on status of NEPA progress for activities and projects funded under Division A of the American Recovery and...

  20. ARRA NEPA Quarterly Report- First Report: DOD

    Data.gov (United States)

    Council on Environmental Quality, Executive Office of the President — Reports prepared by the Departments and Agencies on status of NEPA progress for activities and projects funded under Division A of the American Recovery and...

  1. ARRA NEPA Quarterly Report- First Report: DOC

    Data.gov (United States)

    Council on Environmental Quality, Executive Office of the President — Reports prepared by the Departments and Agencies on status of NEPA progress for activities and projects funded under Division A of the American Recovery and...

  2. ARRA NEPA Quarterly Report- First Report: HUD

    Data.gov (United States)

    Council on Environmental Quality, Executive Office of the President — Reports prepared by the Departments and Agencies on status of NEPA progress for activities and projects funded under Division A of the American Recovery and...

  3. Quarterly report of RCRA groundwater monitoring data for period October 1, 1992--December 31, 1992

    International Nuclear Information System (INIS)

    1993-04-01

    Hanford Site interim-status groundwater monitoring projects are conducted as either background, indicator parameter evaluation, or groundwater quality assessment monitoring programs as defined in the Resource Conservation and Recovery Act of 1976 (RCRA); and Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities, as amended (40 CFR 265). Compliance with the 40 CFR 265 regulations is required by the Washington Administrative Code (WAC) 173-303. Long-term laboratory contracts were approved on October 22, 1991. DataChem Laboratories of Salt Lake City, Utah, performs the hazardous chemicals analyses for the Hanford Site. Analyses for coliform bacteria are performed by Columbia/Biomedical Laboratories and for dioxin by TMS Analytical Services, Inc. International Technology Analytical Services Richland, Washington performs the radiochemical analyses. This quarterly report contains data that were received prior to March 8, 1993. This report may contain not only data from the October through December quarter but also data from earlier sampling events that were not previously reported

  4. Proceedings of the symposium on the joint research project between JAERI and Universities. Status and perspective of the advanced radiation technology project

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-06-01

    This report describes the Proceedings of the Symposium on the Joint Research Project between JAERI and Universities -Status and Perspective of the Advanced Radiation Technology Project-, held at Tokyo on January 27, 1999. After a series of conferences which had been held at the second or third year to present the main activities of this unique collaborative project system, the symposium was particularly focused on critical reviewing of the project and on its future. The scientific papers presented were the recent achievements in the themes: 1) nuclear spectroscopy and nuclear materials science with an isotope separator on-line; 2) radiation shielding and nuclear data for use of accelerators; 3) materials analysis methods using ion beams; 4) microstructure in polymer materials irradiated with ions; 5) effects of transmutation products in fusion-reactor materials; 6) physiological study of plants using positron-emitting isotopes. The new theme titled 'Development and application of micro PIXE analysis in the atmospheric pressure' was proposed. Eight panelists discussed the future of the project. The 17 papers are indexed individually. (J.P.N.)

  5. Quarterly coal report, July--September 1997

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-02-01

    The Quarterly Coal Report (QCR) provides comprehensive information about US coal production, distribution, exports, imports, receipts, prices, consumption, and stocks. Coke production consumption, distribution, imports, and exports data are also provided. This report presents detailed quarterly data for July through September 1997 and aggregated quarterly historical data for 1991 through the second quarter of 1997. Appendix A displays, from 1991 on, detailed quarterly historical coal imports data. 72 tabs.

  6. Status of the R+D programme in the field of the heat carrying and heat transfer components of the PNP project

    International Nuclear Information System (INIS)

    Mausbeck, H.; Jansing, W.

    1984-01-01

    The PNP Project (Project Nuclear Process Heat) is described. It covers the status of research and development in the field of heat exchange and heat exchanger components; concept of plant for coal gasification; description of large scale test facilities and its components; and the time schedule for the project development

  7. Progress and status of the international project on innovative nuclear reactors and fuel cycles (INPRO) - 5182

    International Nuclear Information System (INIS)

    Ponomarev, A.; Fesenko, G.; Grigoriev, F.G.; Korinny, A.; Phillips, J.R.; Rho, K.

    2015-01-01

    The IAEA's International Project on Innovative Nuclear Reactors and Fuel Cycles (INPRO) was established in 2000 through IAEA General Conference resolution. INPRO cooperates with Member States to ensure that sustainable nuclear energy is available to help meet the energy needs of the 21. century. INPRO membership has grown to 41 members and 16 observers. The paper presents the current prospectus of the INPRO programme and details the most recent achievements in the following 7 projects: 1) the GAINS project (Global Architecture of Innovative Nuclear Energy Systems with thermal and fast reactors and a closed nuclear fuel cycle); 2) the SYNERGIES project applies and amends the analytical framework developed in GAINS project to examine more specifically the various forms of regional collaboration among nuclear energy suppliers and users; 3) the KIND project (Key Indicators for Innovative Nuclear Energy Systems) has the objective of developing guidance on the evaluation on innovative nuclear technologies; 4) the ROADMAPS project addresses several possible stages toward nuclear energy sustainability; 5) the RISC project aims at demonstrating that the evolution of safety requirements and technical innovations provide continual progress towards the avoidance of evacuation measures outside NPP sites in case of severe accidents; 6) the FANES project has the objective of carrying out feasibility analyses of advanced and innovative fuels for different reactor systems; and 7) the WIRAF project aims at identifying problematic waste from innovative reactor designs and corresponding nuclear fuel cycles

  8. Environmental Biosciences Quarterly Report

    Energy Technology Data Exchange (ETDEWEB)

    Lawrence C. Mohr, M.D.

    2007-01-31

    In May 2002, the United States Department of Energy (DOE) signed Assistance Instrument Number DE-FC09-02CH11109 with the Medical University of South Carolina (MUSC) to support the Environmental Biosciences Program (EBP). This funding instrument replaces DOE Assistance Instrument Number DE-FC02-98CH10902. EBP is an integrated, multidisciplinary scientific research program, employing a range of research initiatives to identify, study and resolve environmental health risks. These initiatives are consistent with the MUSC role as a comprehensive state-supported health sciences institution and with the nation's need for new and better approaches to the solution of a complex and expansive array of environment-related health problems. The intrinsic capabilities of a comprehensive health sciences institution enable MUSC to be a national resource for the scientific investigation of environmental health issues. EBPs success as a nationally prominent research program is due, in part, to its ability to task-organize scientific expertise from multiple disciplines in addressing these complex problems. Current research projects have focused EBP talent and resources on providing the scientific basis for risk-based standards, risk-based decision making and the accelerated clean-up of widespread environmental hazards. These hazards include trichloroethylene and low-dose ionizing radiation. Work on the trichloroethylene research projects has been slowed as a result of funding uncertainties. The impact of these funding uncertainties has been discussed with the DOE. Plans for restructuring the performance schedule of the trichloroethylene projects have been submitted to the department. A project is also being conducted in the use of geographical information system technology to analyze population health risks related to environmental hazards as a tool for risk-based decision-making. Questions, comments or requests for further information concerning the activities under this

  9. Quarterly environmental radiological survey summary: First quarter 1995 100, 200, 300, and 600 Areas

    International Nuclear Information System (INIS)

    McKinney, S.M.

    1995-04-01

    This report provides a summary of the radiological surveys performed in support of the operational environmental monitoring program at the Hanford Site. The surveys included in this program consist of inactive waste sites; outdoor radiological control areas; tank farm perimeters and associated diversion boxes, lift stations, and vent stations; perimeters of active or uncovered waste sites such as burial grounds, retention basins, ponds, process trenches, and ditches; and road and rail surfaces. This report provides a summary of the radiological surveys performed during the First Quarter of 1995. The status of corrective actions required from current and past reports are also discussed

  10. 77 FR 43344 - Notice of ACHP Quarterly Business Meeting

    Science.gov (United States)

    2012-07-24

    ... ADVISORY COUNCIL ON HISTORIC PRESERVATION Notice of ACHP Quarterly Business Meeting AGENCY: Advisory Council on Historic Preservation. ACTION: Notice. SUMMARY: Notice is hereby given that the... Program Comment on Bridges D. Executive Order on Infrastructure Projects VII. New Business VIII. Adjourn...

  11. Radiotherapy infrastructure and human resources in Switzerland. Present status and projected computations for 2020

    Energy Technology Data Exchange (ETDEWEB)

    Datta, Niloy Ranjan; Khan, Shaka; Marder, Dietmar [KSA-KSB, Kantonsspital Aarau, RadioOnkologieZentrum, Aarau (Switzerland); Zwahlen, Daniel [Kantonsspital Graubuenden, Department of Radiotherapy, Chur (Switzerland); Bodis, Stephan [KSA-KSB, Kantonsspital Aarau, RadioOnkologieZentrum, Aarau (Switzerland); University Hospital Zurich, Department of Radiation Oncology, Zurich (Switzerland)

    2016-09-15

    The purpose of this study was to evaluate the present status of radiotherapy infrastructure and human resources in Switzerland and compute projections for 2020. The European Society of Therapeutic Radiation Oncology ''Quantification of Radiation Therapy Infrastructure and Staffing'' guidelines (ESTRO-QUARTS) and those of the International Atomic Energy Agency (IAEA) were applied to estimate the requirements for teleradiotherapy (TRT) units, radiation oncologists (RO), medical physicists (MP) and radiotherapy technologists (RTT). The databases used for computation of the present gap and additional requirements are (a) Global Cancer Incidence, Mortality and Prevalence (GLOBOCAN) for cancer incidence (b) the Directory of Radiotherapy Centres (DIRAC) of the IAEA for existing TRT units (c) human resources from the recent ESTRO ''Health Economics in Radiation Oncology'' (HERO) survey and (d) radiotherapy utilization (RTU) rates for each tumour site, published by the Ingham Institute for Applied Medical Research (IIAMR). In 2015, 30,999 of 45,903 cancer patients would have required radiotherapy. By 2020, this will have increased to 34,041 of 50,427 cancer patients. Switzerland presently has an adequate number of TRTs, but a deficit of 57 ROs, 14 MPs and 36 RTTs. By 2020, an additional 7 TRTs, 72 ROs, 22 MPs and 66 RTTs will be required. In addition, a realistic dynamic model for calculation of staff requirements due to anticipated changes in future radiotherapy practices has been proposed. This model could be tailor-made and individualized for any radiotherapy centre. A 9.8 % increase in radiotherapy requirements is expected for cancer patients over the next 5 years. The present study should assist the stakeholders and health planners in designing an appropriate strategy for meeting future radiotherapy needs for Switzerland. (orig.) [German] Ziel dieser Studie war es, den aktuellen Stand der Infrastruktur und Personalausstattung der

  12. Waste Tank Vapor Characterization Project: Annual status report for FY 1995

    International Nuclear Information System (INIS)

    Ligotke, M.W.; Fruchter, J.S.; Huckaby, J.L.; Birn, M.B.; McVeety, B.D.; Evans, J.C. Jr.; Pool, K.H.; Silvers, K.L.; Goheen, S.C.

    1995-11-01

    This report compiles information collected during the Fiscal Year 1995 pertaining to the waste tank vapor characterization project. Information covers the following topics: project management; organic sampling and analysis; inorganic sampling and analysis; waste tank vapor data reports; and the waste tanks vapor database

  13. Current status of the KNPP units 1 to 4 decommissioning projects

    International Nuclear Information System (INIS)

    Benbow, R.

    2010-01-01

    The PMU has been established in support of the KNPP Decommissioning Division. All of the Infrastructure Projects associated with Decommissioning have been identified. All the major projects are either in Contract or have the Tender Packages prepared and are being managed/implemented through the EBRD Procurement Process. KNPP Decommissioning is being supported with the necessary documentation, tools and equipment

  14. Second quarterly report 1976

    International Nuclear Information System (INIS)

    1976-11-01

    The report describes activities carried out in the framework of the Fast Breeder Project at Karlsruhe Nuclear Research Centre or on its behalf. There are contributions to the following issues: fuel rod development, materials analysis and development, corrosion tests and coolant analyses, physical experiments, reactor theory, the safety of fast reactors, instrumentation and signal processing for core monitoring, environmental effects, sodium technology experiments, thermo- and fluid-dynamic studies in gases, studies on the layout of gas-cooled breeder reactors, studies on the layout of sodium-cooled breeder reactors. (HR) [de

  15. Quarterly environmental radiological survey summary - first quarter 1997 100, 200, 300, and 600 areas

    International Nuclear Information System (INIS)

    Mckinney, S.M.

    1997-01-01

    This report provides a summary of the radiological surveys performed in support of near-facility environmental monitoring at the Hanford Site. The First Quarter 1997 survey results and the status of actions required are summarized below: (1) All of the routine environmental radiological surveys scheduled during January, February, and March 1997, were performed as planned. (2) One hundred four environmental radiological surveys were performed during the first quarter 1997, twenty-nine at the active waste sites and seventy-five at the inactive waste sites. Contamination above background levels was found at eight of the active waste sites and seven of the inactive waste sites. Contamination levels as high as >1,000,000 disintegrations per minute (dpm) were reported. Of these contaminated surveys twelve were in Underground Radioactive Material (URM) areas and three were in contamination areas. The contamination found within ten of the URM areas was immediately cleaned up and no further action was required. In the remaining five sites the areas were posted and will require decontamination. Radiological Problem Reports (RPR's) were issued and the sites were turned over to the landlord for further action if required. (3) During the first quarter of 1997, 5.6 hectares (13.8 acres) were stabilized and radiologically down posted from Contamination Area (CA)/Soil Contamination (SC) to URM. (4) During the first quarter of 1997, the size of 216-A-25 Gable Mountain Pond was increased from 30.4 to 34.5 hectares (75.0 to 85.2 acres). This increase in size was due to the correction of the original boundary area by using the advanced technology of a global positioning system (GPS). An area, 1.6 hectares (4.0 acres), east of and adjacent to the 241-S/SX/SY tank farm complex was posted as a contamination/soil contamination area. (5) Five open Surveillance Compliance Inspection Reports (SCIRs) had not been resolved

  16. The AMTEX Partnership. Third quarter report

    Energy Technology Data Exchange (ETDEWEB)

    1994-06-01

    The AMTEX Partnership is a collaborative research and development program among the U.S. Integrated Textile Industry, the Department of Energy, The DOE laboratories, other federal agencies and laboratories, and universities. The goal of AMTEX is to strengthen the competitiveness of this vital U.S. industry and thereby preserve and create American jobs. During the third quarter of 1994 all the Cooperative Research and Development Agreements (CRADAs) were completed and work initiated for three additional projects: Computer Aided Fabric Evaluation (CAFE), Textile Resource Conservation (TReC), and Sensors for Agile Manufacturing (SFAM). The plan for a Cotton Biotechnology project was completed and reviewed by the Industry Technical Advisory Committee. In addition, an `impact study` on the topic of flexible fiber production was conducted by an industry group led by the fiber manufacturers.

  17. First quarter 2005 sales data

    International Nuclear Information System (INIS)

    2005-04-01

    This press release brings information on the AREVA group sales data. First quarter 2005 sales for the group were 2,496 millions of euros, up 3,6% year-on-year from 2,41 millions. The change in foreign exchange rates between the two periods show a negative impact of 22 millions euros, which is much lower than in the first quarter of 2004. It analyzes also in more details the situation of the front end, the reactors and service division, the back end division, the transmission and distribution division and the connectors division. (A.L.B.)

  18. Impact of low mini-mental status on health outcome up to 5 years after stroke: the Erlangen Stroke Project.

    Science.gov (United States)

    Liman, T G; Heuschmann, P U; Endres, M; Flöel, A; Schwab, S; Kolominsky-Rabas, P L

    2012-06-01

    Cognitive deficits are frequent stroke sequelae. Data from population-based stroke cohorts on the impact of cognitive deficits on long-term outcome are scarce. The purpose of this study was to investigate the impact of low mini-mental status on health outcome up to 5 years after first-ever stroke. Data were collected from the Erlangen Stroke Project, a population-based stroke registry covering a source population of 103,000 inhabitants. The Mini-Mental State Examination (MMSE) was used to assess global cognitive function. Health outcome included limitations in instrumental activities of daily living (IADL, Frenchay Activities Index), low independence in activities of daily living (ADL, Barthel Index), depressive symptoms (Zung Self Rating Depression Scale), and institutionalization. Using multivariate logistic regression analysis, association of an education-adjusted MMSE score ≤ 24 with these health outcomes was investigated within distinct models at 12, 36, and 60 months after stroke as well as predictors at 3 months for low IADL. A total of 705 patients with first-ever stroke were included. Institutionalization, low levels of ADL and IADL (p mini-mental status up to 3 years after stroke (OR 2.69, 95% CI 1.2-5.8) as well as older age (p mini-mental status has an independent impact on long-term health outcome after stroke. Our results emphasize the importance of cognitive status screening to identify stroke survivors at risk and manage and treat these patients more efficiently.

  19. Is Socio-Economic Status a Determinant of HIV-Related Stigma Attitudes in Zimbabwe? Findings from Project Accept.

    Science.gov (United States)

    Mateveke, Kudzanai; Singh, Basant; Chingono, Alfred; Sibanda, E; Machingura, Ian

    2016-08-17

    HIV related stigma and discrimination is a known barrier for HIV prevention and care. We aimed to assess the relationship between socio-economic status (SES) and HIV related stigma in Zimbabwe. This paper uses data from Project Accept , which examined the impact of community-based voluntary counseling and testing intervention on HIV incidence and stigma. Total of 2522 eligible participants responded to a psychometric assessment tool, which assessed HIV related stigma and discrimination attitudes on 4 point Likert scale. The tool measured three components of HIV-related stigma: shame, blame and social isolation, perceived discrimination, and equity. Participants' ownership of basic assets was used to assess the socio-economic status. Shame, blame and social isolation component of HIV related stigma was found to be significantly associated with medium [odds ratio (OR)=1.73, Pstigma and discrimination programs to be effective, they should take into account the socio-economic context of target population.

  20. Current status of food irradiation in overseas (2013). From the meeting report of RCA food irradiation project

    International Nuclear Information System (INIS)

    Todoriki, Setsuko

    2013-01-01

    The report introduces the activity of RCA (Regional Cooperative Agreement for Research Development and Training Related to Nuclear Science and Technology for Asia and Pacific) food irradiation project (RAS/5/057) and information obtained at the two workshops on current status of Asia and Pacific areas together with EU, USA and Japan. Also current trends of RAS/5/057 Implementing Best Practices for food irradiation for plant sanitary and phytosanitary purposes are described. Amount of food irradiation products of RCA member countries, minimum adopted doses for quarantine harmful insects (70 to 232 Gy) and import amount of fruits of USA (79 to 5500 tons) are tabulated. Finally current status of Japan is explained. (S. Ohno)

  1. Fabrication and closure development of nuclear waste disposal containers for the Yucca Mountain Project: Status report

    International Nuclear Information System (INIS)

    Domian, H.A.; Robitz, E.S.; Conrardy, C.C.; LaCount, D.F.; McAninch, M.D.; Fish, R.L.; Russell, E.W.

    1991-09-01

    In GFY 89, a project was underway to determine and demonstrate a suitable method for fabricating thin-walled monolithic waste containers for service within the potential repository at Yucca Mountain. A concurrent project was underway to determine and demonstrate a suitable closure process for these containers after they have been filled with high-level nuclear waste. Phase 1 for both the fabrication and closure projects was a screening phase in which candidate processes were selected for further laboratory testing in Phase 2. This report describes the final results of the Phase 1 efforts. It also describes the preliminary results of Phase 2 efforts

  2. Status of the Southern California Edison Company 3 MW Wind Turbine Generator (WTG) demonstration project

    Science.gov (United States)

    Scheffler, R. L.

    1979-01-01

    To demonstrate the concept of utility scale electricity production from a high wind energy resource, a program was initiated to construct and test a 3 megawatt (3,000 kW) Schachle wind turbine generator near Palm Springs, California. The background and current status of this program are presented along with a summary of future planned program activities.

  3. Quarterly coal report, April--June 1997

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-11-01

    The Quarterly Coal Report (QCR) provides comprehensive information about US coal production, distribution, exports, imports, receipts, prices, consumption, and stocks to a wide audience. Coke production, consumption, distribution, imports, and exports data are also provided. This report presents detailed quarterly data for April through June 1997 and aggregated quarterly historical data for 1991 through the first quarter of 1997. Appendix A displays, from 1991 on, detailed quarterly historical coal imports data. Appendix B gives selected quarterly tables converted to metric tons. To provide a complete picture of coal supply and demand in the US, historical information has been integrated in this report. 8 figs., 73 tabs.

  4. Soil-plant water status and wine quality: the case study of Aglianico wine (the ZOViSA project)

    Science.gov (United States)

    Bonfante, Antonello; Manna, Piero; Albrizio, Rossella; Basile, Angelo; Agrillo, Antonietta; De Mascellis, Roberto; Caputo, Pellegrina; Delle Cave, Aniello; Gambuti, Angelita; Giorio, Pasquale; Guida, Gianpiero; Minieri, Luciana; Moio, Luigi; Orefice, Nadia; Terribile, Fabio

    2014-05-01

    The terroir analysis, aiming to achieve a better use of environmental features with respect to plant requirement and wine production, needs to be strongly rooted on hydropedology. In fact, the relations between wine quality and soil moisture regime during the cropping season is well established. The ZOViSA Project (Viticultural zoning at farm scale) tests a new physically oriented approach to terroir analysis based on the relations between the soil-plant water status and wine quality. The project is conducted in southern Italy in the farm Quintodecimo of Mirabella Eclano (AV) located in the Campania region, devoted to quality Aglianico red wine production (DOC). The soil spatial distribution of study area (about 3 ha) was recognized by classical soil survey and geophysics scan by EM38DD; then the soil-plant water status was monitored for three years in two experimental plots from two different soils (Cambisol and Calcisol). Daily climate variables (temperature, solar radiation, rainfall, wind), daily soil water variables (through TDR probes and tensiometers), crop development (biometric and physiological parameters), and grape must and wine quality were monitored. The agro-hydrological model SWAP was calibrated and applied in the two experimental plots to estimate soil-plant water status in different crop phenological stages. The effects of crop water status on crop response and wine quality was evaluated in two different pedo-systems, comparing the crop water stress index with both: crop physiological measurements (leaf gas exchange, leaf water potential, chlorophyll content, LAI measurement), grape bunches measurements (berry weight, sugar content, titratable acidity, etc.) and wine quality (aromatic response). Finally a "spatial application" of the model was carried out and different terroirs defined.

  5. Electricity and gas market observatory. 4. Quarter 2007

    International Nuclear Information System (INIS)

    2007-01-01

    The purpose of the observatory is to provide the general public with indicators for monitoring market deregulation. It both covers the wholesale and retail electricity and gas markets in Metropolitan France. This observatory is updated every three months and data are available on CRE web site (www.cre.fr). Since the 1. of July 2007, all customers can choose their gas and electricity suppliers. Content: A - The electricity market: The retail electricity market (Introduction, Customer segments and their respective weight, Status at December 31, 2007, Dynamic analysis: 4. Quarter 2007); The wholesale electricity market (Introduction, Wholesale market activity in France, Prices on the French wholesale market and European comparison, Import and export volumes, Concentration of the French electricity market, Striking fact of the fourth quarter 2007); B - The gas market: The retail gas market (Introduction, Customer segments and their respective weight, Status on December 31. 2007, Dynamic analysis: 4. Quarter 2007); The wholesale gas market (Gas pricing and gas markets in Europe, The wholesale market in France, Striking fact of the fourth quarter 2007); C - Appendices: Electricity and gas market observatories combined glossary, Specific electricity market observatory glossary, Specific gas market observatory glossary

  6. Education, marital status, and risk of hip fractures in older men and women: the CHANCES project.

    Science.gov (United States)

    Benetou, V; Orfanos, P; Feskanich, D; Michaëlsson, K; Pettersson-Kymmer, U; Ahmed, L A; Peasey, A; Wolk, A; Brenner, H; Bobak, M; Wilsgaard, T; Schöttker, B; Saum, K-U; Bellavia, A; Grodstein, F; Klinaki, E; Valanou, E; Papatesta, E-M; Boffetta, P; Trichopoulou, A

    2015-06-01

    The role of socioeconomic status in hip fracture incidence is unclear. In a diverse population of elderly, higher education was found to be associated with lower, whereas living alone, compared to being married/cohabiting, with higher hip fracture risk. Educational level and marital status may contribute to hip fracture risk. The evidence on the association between socioeconomic status and hip fracture incidence is limited and inconsistent. We investigated the potential association of education and marital status with hip fracture incidence in older individuals from Europe and USA. A total of 155,940 participants (79 % women) aged 60 years and older from seven cohorts were followed up accumulating 6456 incident hip fractures. Information on education and marital status was harmonized across cohorts. Hip fractures were ascertained through telephone interviews/questionnaires or through record linkage with registries. Associations were assessed through Cox proportional hazard regression adjusting for several factors. Summary estimates were derived using random effects models. Individuals with higher education, compared to those with low education, had lower hip fracture risk [hazard ratio (HR) = 0.84, 95 % confidence interval (CI) 0.72-0.95]. Respective HRs were 0.97 (95 % CI 0.82-1.13) for men and 0.75 (95 % CI 0.65-0.85) for women. Overall, individuals living alone, especially those aged 60-69 years, compared to those being married/cohabiting, tended to have a higher hip fracture risk (HR = 1.12, 95 % CI 1.02-1.22). There was no suggestion for heterogeneity across cohorts (P heterogeneity > 0.05). The combined data from >150,000 individuals 60 years and older suggest that higher education may contribute to lower hip fracture risk. Furthermore, this risk may be higher among individuals living alone, especially among the age group 60-69 years, when compared to those being married/cohabiting.

  7. Western Gas Sands Project. Status report, 1 January 1979--31 January 1979

    Energy Technology Data Exchange (ETDEWEB)

    Atkinson, C H

    1979-01-01

    Aim is to increase gas production from the low-permeability gas sands of the western U.S. Progress is reported on: project management, resource assessment, R and D at various facilities, and field tests and demonstrations. (DLC)

  8. The elderly health status and its correlation with ageing biomarkers: the European Project Mark-Age

    OpenAIRE

    Pini, Elisa

    2014-01-01

    According to the latest statistics projections formulated by Eurostat, the proportion of elderly EU-27’s population aged over 65 years old is predicted to increase from 17.5 % in 2011 to 29.5 % by 2060. This "population explosion" makes extremely important to identify the different genetic and molecular mechanisms which underpin the morbidity and mortality along with new strategies able to counteract or slow down its progress. In this scenario fits the European Project MARK-AGE who...

  9. The reconstruction of HT-7 superconducting tokamak and the present status of HT-7U project

    International Nuclear Information System (INIS)

    Weng, P.D.

    2000-01-01

    The first Chinese superconducting tokamak HT-7 was reconstructed from T-7. The main purposes of reconstruction are to improve the accessibility of the device and to provide a possibility of long pulse operation with high performance. The reconstruction has been done successfully. The HT-7U project has been approved and funded as a National Project, the engineering design and R and D are on the way. (author)

  10. Overview and status of the prototype project for Wendelstein 7-X control system

    Energy Technology Data Exchange (ETDEWEB)

    Schacht, Joerg [Max-Planck-Institut fuer Plasmaphysik, EURATOM Association, Teilinstitut Greifswald, Wendelsteinstrasse 1, D-17491 Greifswald (Germany)], E-mail: joerg.schacht@ipp.mpg.de; Bluhm, Torsten; Herbst, Uwe; Hennig, Christine; Heinrich, Stefan; Kuehner, Georg; Koester, Erik; Laqua, Heike; Lewerentz, Marc; Marquardt, Mirco; Meyer, Christiane; Mueller, Ina; Pingel, Steffen; Sachtleben, Juergen; Spring, Anett; Werner, Andreas; Woelk, Andreas [Max-Planck-Institut fuer Plasmaphysik, EURATOM Association, Teilinstitut Greifswald, Wendelsteinstrasse 1, D-17491 Greifswald (Germany)

    2009-06-15

    This contribution gives an overview of the project 'Prototype W7-X control system'. The objective of this prototype project is to demonstrate the applicability of the segment orientated control system at a running fusion experiment including steady-state operation, interaction of all relevant components, real time control, data acquisition and on-line data analysis. Furthermore, the W7-X safety concept will be implemented at WEGA and tested.

  11. Cogeneration and Small Power Production Quarterly Report to the California Public Utilities Commission First Quarter 1984

    Energy Technology Data Exchange (ETDEWEB)

    None

    1984-01-01

    At the end of the First Quarter of 1984, the number of signed contracts and letter agreements for cogeneration and small power production projects was 322, with a total estimated nominal capacity of 2,643 MW. Of these totals, 215 projects, capable of producing 640 MW, are operational. A map indicating the location of operational facilities under contract with PG and E is provided. Developers of cogeneration, solid waste, or biomass projects had signed 110 contracts with a potential of 1,467 MW. In total, 114 contracts and letter agreements had been signed with projects capable of producing 1,508 MW. PG and E also had under active discussion 35 cogeneration projects that could generate a total of 425 MW to 467 MW, and 11 solid waste or biomass projects with a potential of 94 MW to 114 MW. One contract had been signed for a geothermal project, capable of producing 80 MW. There were 7 solar projects with signed contracts and a potential of 37 MW, as well as 5 solar projects under active discussion for 31 MW. Wind farm projects under contract numbered 32, with a generating capability of 848 MW. Also, discussions were being conducted with 18 wind farm projects, totaling 490 MW. There were 101 wind projects of 100 kW or less with signed contracts and a potential of 1 MW, as well as 6 other small wind projects under active discussion. There were 64 hydroelectric projects with signed contracts and a potential of 148 MW, as well as 75 projects under active discussion for 316 MW. In addition, there were 31 hydroelectric projects, with a nominal capacity of 187 MW, that Pg and E was planning to construct.

  12. Cogeneration and Small Power Production Quarterly Report to the California Public Utilities Commission Third Quarter 1983

    Energy Technology Data Exchange (ETDEWEB)

    None

    1983-01-01

    In the Third Quarter of 1983, the number of signed contracts and committed projects rose from 240 to 258, with a total estimated nominal capacity of these projects of 1,547 MW. Of this nominal capacity, about 416 MW is operational, and the balance is under contract for development. A map indicating the location of operational facilities under contract with PG and E is provided. Of the 258 signed contracts and committed projects, 83 were cogeneration, solid waste, or biomass projects with a potential of 779 MW. PG and E also had under active discussion 38 cogeneration projects that could generate a total of 797 MW to 848 MW, and 19 solid waste/biomass projects with a potential of 152 MW to 159 MW. Two contracts have been signed with geothermal projects, capable of producing 83 MW. There are 6 solar projects with signed contracts and a potential of 36 MW, as well as 3 solar projects under active discussion for 31 MW. Wind farm projects under contract number 21, with a generating capability of 528 MW. Also, discussions are being conducted with 17 wind farm projects, totaling 257 to 262 MW. There are 94 wind projects of 100 kW or less with signed contracts and a potential of almost 1 MW, as well as 8 other small wind projects under active discussion. There are 50 hydroelectric projects with signed contracts and a potential of 112 MW, as well as 67 projects under active discussion for 175 MW. In addition, there are 31 hydroelectric projects, with a nominal capacity of 185 MW, that PG and E is planning to construct.

  13. Present Status of the JENDL Project (May, 2013). WPEC Meeting, Paris, France, 23-24 May, 2013

    International Nuclear Information System (INIS)

    Fukahori, Tokio; Iwamoto, Osamu; Ishikawa, Makoto

    2013-01-01

    This paper briefly presents the present status of the Japanese JENDL Project: organization of Japanese Nuclear Data Committee (JNDC), a research committee for JAEA research activities; Nuclear Data Evaluation (JENDL-4.0 Updated Files and JENDL-4.0 Plus, benchmarking for fission reactor applications (criticality for thermal systems, adjusted library for fast systems), new evaluations, covariances, evaluation tools, fission products decay data file); other activities such as the 2012 Symposium on Nuclear Data at Kyoto University Research Reactor Institute, the initiation of conversation on Covariance Data with users, the celebration of the Golden Jubilee (since 1963) of JNDC

  14. Long-term archives of land surface albedo products through the EUMETSAT/LSA-SAF and ECMWF/C3S projects: status and project development plan

    Science.gov (United States)

    Carrer, D.; Pinault, F.; Ceamanos, X.; Meurey, C.; Moparthy, S.; Swinnen, E.; Trigo, I.

    2017-12-01

    The two space programs of EUMETSAT (project CDOP3, LSA-SAF) and ECMWF (the Copernicus Climate Change Service; C3S_312a Lot9) provide (or will provide) added-value satellite products for the meteorological and environmental science communities, especially in the fields of climate modeling, environmental management, natural hazards management, and climate change detection. The EUMETSAT/LSA-SAF project started in 1999 with research and development activities. The Third Continuous Development and Operations Phase (CDOP-3) starts in March 2017 and will end in 2022. This project uses instruments on board European satellites that were, or will be, launched between 2004 and 2022. Unlike the LSA-SAF, the COPERNICUS/C3S_312a project has no NRT constraint. Its first phase started in november 2016. One of the major objective of the COPERNICUS/C3S_312a project is to harmonize datasets from various sensors in order to provide consistent and continuous ECV products from the 80's until now.Presently, the delivered operational products comprise several surface albedo products using data from various space missions (METEOSAT, NOAA, METOP, …). We present here the portfolio of the surface albedo products that are disseminated with an operational status. Their characteristics and accuracy are detailed here after. Also we will present the development plan to produce long-term re-analysis and to prepare the arrival of the next generation of satellite (MTG, EPS-SG, ...). This work will lead in 2018 to 40 years of products characterizing the albedo properties of the surface. These programs provide a great opportunity to monitor and identify human-induced climate change since consistent production of data sets is guaranteed until at least 2022.

  15. Energy situation - Fourth quarter 2017

    International Nuclear Information System (INIS)

    Guggemos, Fabien; Misak, Evelyne; Mombel, David; Moreau, Sylvain

    2018-02-01

    This publication presents, first, a quarterly report of the French energy situation: primary energy consumption, energy independence and CO 2 emissions, national production, imports, exports, energy costs, average and spot prices. Data are presented separately for solid mineral fuels, petroleum products, natural gas and electricity. The methodology, the definitions and the corrections used are explained in a second part

  16. NST Quarterly - issue October 2001

    International Nuclear Information System (INIS)

    2001-01-01

    NST Quarterly reports current development in Nuclear Science and Technology in Malaysia. In this issue it reviews GM technology and GMOs - genetically modified organisms. The topics discussed includes the implication of GM in practice, the controversy and the prospect of GM technology. Radioactive pig - something like a ball or plug which cleanses the inner walls of the pipeline, also briefly presented

  17. NST Quarterly - October 1997 issue

    International Nuclear Information System (INIS)

    1997-01-01

    NST Quarterly reports current development in Nuclear Science and Technology in Malaysia. In this issue it highlights MINT activities in scientific computer modelling and simulation. A report on 2-nd FAO/IAEA research coordination meeting (RCM) of the coordinated research programme (CRP) on public acceptance of the trade development in irradiated food in Asia and the Pacific (RPFI-IV) also presented

  18. NST Quarterly. January 1996 issue

    International Nuclear Information System (INIS)

    1996-01-01

    NST Quarterly reports current development in Nuclear Science and Technology in Malaysia. In this issue it highlights MINT activities in nuclear medicine, healthcare products sterilization, industrial irradiation dosimetry and heavy metals determination in food. The Malaysian standard for food irradiation was discussed in this issue

  19. NST Quarterly - April 2000 issue

    International Nuclear Information System (INIS)

    1999-01-01

    NST Quarterly reports current development in Nuclear Science and Technology in Malaysia. In this issue it highlights MINT activities in genetic engineering. The articles summarized the improvement of orchids and tulips through genetic engineering and generating new varieties for the floriculture industry. It also reported, MINT won gold and silver at the International Invention 2000, 12-16 April 2000, Geneva

  20. Quarter 9 Mercury information clearinghouse final report

    Energy Technology Data Exchange (ETDEWEB)

    Laudal, D.L.; Miller, S.; Pflughoeft-Hassett, D.; Ralston, N.; Dunham, G.; Weber, G.

    2005-12-15

    The Canadian Electricity Association (CEA) identified a need and contracted the Energy & Environmental Research Center (EERC) to create and maintain an information clearinghouse on global research and development activities related to mercury emissions from coal-fired electric utilities. A total of eight reports were completed and are summarized and updated in this final CEA quarterly report. Selected topics were discussed in detail in each quarterly report. Issues related to mercury from coal-fired utilities include the general areas of measurement, control, policy, and transformations. Specific topics that have been addressed in previous quarterly reports include the following: Quarterly 1 - Sorbent Control Technologies for Mercury Control; Quarterly 2 - Mercury Measurement; Quarterly 3 - Advanced and Developmental Mercury Control Technologies; Quarterly 4 - Prerelease of Mercury from Coal Combustion By-Products; Quarterly 5 - Mercury Fundamentals; Quarterly 6 - Mercury Control Field Demonstrations; Quarterly 7 - Mercury Regulations in the United States: Federal and State; and Quarterly 8 - Commercialization Aspects of Sorbent Injection Technologies in Canada. In this last of nine quarterly reports, an update of these mercury issues is presented that includes a summary of each topic, with recent information pertinent to advances made since the quarterly reports were originally presented. In addition to a comprehensive update of previous mercury-related topics, a review of results from the CEA Mercury Program is provided. 86 refs., 11 figs., 8 tabs.

  1. Network, system, and status software enhancements for the autonomously managed electrical power system breadboard. Volume 1: Project summary

    Science.gov (United States)

    Mckee, James W.

    1990-01-01

    This volume (1 of 4) gives a summary of the original AMPS software system configuration, points out some of the problem areas in the original software design that this project is to address, and in the appendix collects all the bimonthly status reports. The purpose of AMPS is to provide a self reliant system to control the generation and distribution of power in the space station. The software in the AMPS breadboard can be divided into three levels: the operating environment software, the protocol software, and the station specific software. This project deals only with the operating environment software and the protocol software. The present station specific software will not change except as necessary to conform to new data formats.

  2. The MEarth Project: Status Update and the Commissioning of a Brand New Telescope Array in the Southern Hemisphere

    Science.gov (United States)

    Berta-Thompson, Zachory K.; Irwin, Jonathan; Charbonneau, David; Newton, Elisabeth R.; Dittmann, Jason

    2014-06-01

    The MEarth Project is an ongoing all-sky survey for Earth-like planets transiting the closest, smallest M dwarfs. MEarth aims to find good targets for atmospheric characterization with JWST and the next generation of enormous ground-based telescopes. MEarth's yearly data releases, containing precise light curves of nearby mid-to-late M dwarfs, provide a unique window into the photometric variability of the stars that will forever be among the most interesting targets in the search for potentially habitable exoplanets. We present a status update on the MEarth Project, including a detailed map of the progress we’ve made so far with 8 telescopes in the Northern hemisphere and promising early results from our new installation of 8 more telescopes in the Southern hemisphere.

  3. FRM-II project status and safety of its compact fuel element

    International Nuclear Information System (INIS)

    Nuding, M.; Rottmann, M.; Axmann, A.; Boening, K.

    2000-01-01

    The construction of the new research reactor FRM-II is close to completion and the nuclear start-up is scheduled to begin in January 2001. This contribution provides an overview on the concept of the facility and the safety features of the reactor. It also describes some of the tests performed during the licensing procedure of the compact fuel element and their results. At the end a short status report is given. (author)

  4. FRM-II project status and safety of its compact fuel element

    Energy Technology Data Exchange (ETDEWEB)

    Nuding, M.; Rottmann, M.; Axmann, A.; Boening, K. [Technical University of Munich, D-85747 Garching (Germany)

    2000-07-01

    The construction of the new research reactor FRM-II is close to completion and the nuclear start-up is scheduled to begin in January 2001. This contribution provides an overview on the concept of the facility and the safety features of the reactor. It also describes some of the tests performed during the licensing procedure of the compact fuel element and their results. At the end a short status report is given. (author)

  5. Application of MARSSIM for Final Status Survey of the Decommissioning Project

    International Nuclear Information System (INIS)

    Hong, Sang Bum; Lee, Ki Won; Park, Jin Ho; Chung, Un Soo

    2011-01-01

    The release of a site and building from regulatory control is the final stage of the decommissioning process. The MARSSIM (Multi-Agency Radiation Survey and Site Investigation Manual) provides overall framework for conducting data collection for a final status survey to demonstrate compliance with site closure requirements. The KAERI carried out establishing a final status survey by using the guidance provided in the MARSSIM for of a site and building of the Korea Research Reactor. The release criteria for a site and building were set up based on these results of the site specific release levels which were calculated by using RESRAD and RESRAD-Build codes. The survey design for a site and building was classified by using the survey dataset and potential contamination. The number of samples in each survey unit was calculated by through a statistical test using the collected data from a scoping and characterization survey. The results of the final status survey were satisfied the release criteria based on an evaluation of the measured data.

  6. Irradiation project of SiC/SiC fuel pin 'INSPIRE': Status and future plan

    International Nuclear Information System (INIS)

    Kohyama, Akira; Kishimoto, Hirotatsu

    2015-01-01

    After the March 11 Disaster in East-Japan, Research and Development towards Ensuring Nuclear Safety Enhancement for LWR becomes a top priority R and D in nuclear energy policy of Japan. The role of high temperature non-metallic materials, such as SiC/SiC, is becoming important for the advanced nuclear reactor systems. SiC fibre reinforced SiC composite has been recognised to be the most attractive option for the future, now, METI fund based project, INSPIRE, has been launched as 5-year termed project at OASIS in Muroran Institute of Technology aiming at early realisation of this system. INSPIRE is the irradiation project of SiC/SiC fuel pins aiming to accumulate material, thermal, irradiation effect data of NITE-SiC/SiC in BWR environment. Nuclear fuel inserted SiC/SiC fuel pins are planned to be installed in the Halden reactor. The project includes preparing the NITE-SiC/SiC tubes, joining of end caps, preparation of rigs to control the irradiation environment to BWR condition and the instruments to measure the condition of rigs and pins in operation. Also, basic neutron irradiation data will be accumulated by SiC/SiC coupon samples currently under irradiation in BR2. The output from this project may present the potentiality of NITE-SiC/SiC fuel cladding with the first stage fuel-cladding interaction. (authors)

  7. The Cosmetics Europe strategy for animal-free genotoxicity testing: project status up-date.

    Science.gov (United States)

    Pfuhler, S; Fautz, R; Ouedraogo, G; Latil, A; Kenny, J; Moore, C; Diembeck, W; Hewitt, N J; Reisinger, K; Barroso, J

    2014-02-01

    The Cosmetics Europe (formerly COLIPA) Genotoxicity Task Force has driven and funded three projects to help address the high rate of misleading positives in in vitro genotoxicity tests: The completed "False Positives" project optimized current mammalian cell assays and showed that the predictive capacity of the in vitro micronucleus assay was improved dramatically by selecting more relevant cells and more sensitive toxicity measures. The on-going "3D skin model" project has been developed and is now validating the use of human reconstructed skin (RS) models in combination with the micronucleus (MN) and Comet assays. These models better reflect the in use conditions of dermally applied products, such as cosmetics. Both assays have demonstrated good inter- and intra-laboratory reproducibility and are entering validation stages. The completed "Metabolism" project investigated enzyme capacities of human skin and RS models. The RS models were shown to have comparable metabolic capacity to native human skin, confirming their usefulness for testing of compounds with dermal exposure. The program has already helped to improve the initial test battery predictivity and the RS projects have provided sound support for their use as a follow-up test in the assessment of the genotoxic hazard of cosmetic ingredients in the absence of in vivo data. Copyright © 2013 Elsevier Ltd. All rights reserved.

  8. Quarterly, Bi-annual and Annual Reports

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The Quarterly, Bi-annual and Annual Reports are periodic reports issued for public release. For the deep set fishery these reports are issued quarterly and anually....

  9. Nigerian Quarterly Journal of Hospital Medicine: Submissions

    African Journals Online (AJOL)

    Nigerian Quarterly Journal of Hospital Medicine: Submissions. Journal Home > About the Journal > Nigerian Quarterly Journal of Hospital Medicine: Submissions. Log in or Register to get access to full text downloads.

  10. NAWIG News: The Quarterly Newsletter of the Native American Wind Interest Group, Summer 2007

    Energy Technology Data Exchange (ETDEWEB)

    2007-06-01

    DOE's Wind Powering America program has initiated a quarterly NAWIG newsletter to present Native American wind information, including projects, interviews with pioneers, issues, WPA activities, and related events.

  11. Quarterly Technical Progress Report June 2015

    Energy Technology Data Exchange (ETDEWEB)

    Buchholz, Bruce A. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2015-06-08

    The project has two main goals: 1) Identify the types of adducts naphthalene (NA) forms with DNA and 2) determine whether adduct formation correlates with site selective tumor formation in defined subcompartments of the respiratory tract (respiratory and olfactory nasal epithelium and airways of mice, rats and rhesus monkeys). Five tasks are associated with the completion of the goals. Task 1: Contracting and Animal Use Approvals. IACUC and ACURO approvals are complete, The subcontract with UC Davis (UCD) was executed in December 2014. Task 2: Perform In Vitro Study for Goal 1. Rat samples exposed and in freezer while adduct standards are being made. Mouse samples need to be exposed in next quarter. Task 3: Perform In Vitro Study for Goal 2. Mouse ex vivo samples completed. Rat and monkey samples need to be completed in the next quarter. Task 4: Sample Preparation and Analysis. Mouse Goal 2 samples completed. Other samples remain to be done. Task 5: Data Interpretation and Reporting. Need rat data to write paper on adduct formation.

  12. The Imo State (Nigeria) Drinking Water Supply and Sanitation Project, 2. Impact on dracunculiasis, diarrhoea and nutritional status.

    Science.gov (United States)

    Huttly, S R; Blum, D; Kirkwood, B R; Emeh, R N; Okeke, N; Ajala, M; Smith, G S; Carson, D C; Dosunmu-Ogunbi, O; Feachem, R G

    1990-01-01

    Morbidity due to dracunculiasis (guinea worm disease) and diarrhoea in persons of all ages, and nutritional status of young children, were used as health impact indicators in the evaluation of the Imo State Drinking Water Supply and Sanitation Project in south-eastern Nigeria. Data were collected using repeated cross-sectional surveys and longitudinal follow-up. The study area was found to have a low level of endemicity of dracunculiasis. While no impact could be demonstrated on overall period or point prevalence rates in the cross-sectional surveys, a prospective longitudinal survey showed a significant reduction in the percentage of person-fortnights positive for dracunculiasis in areas served by the project, while the control areas showed no such change. In the cross-sectional surveys it was found that, in the project villages, those persons drinking only borehole water had significantly lower period prevalence rates one year later than others. Moreover, those living further from the nearest borehole had higher rates of dracunculiasis. An impact of the project on diarrhoea morbidity was found only in limited sub-groups of the population. A greater association with water availability rather than quality was suggested for rates in young children. The prevalence of wasting (less than 80% weight-for-height) among children aged less than 3 years decreased significantly over time in all 3 intervention villages; there was no such decline in the control villages.

  13. Papers presented at the 7th status report of the Reprocessing and Waste Treatment Project

    International Nuclear Information System (INIS)

    1988-10-01

    The report contains all lectures on the present state of the R+D work which were delivered on the occasion of the 7th seminar on the present state of the Reprocessing and Waste Treatment Project in the Karlsruhe Nuclear Research Centre on 15/16 March 1988. The project is aimed at improving methods for nuclear waste disposal with regard to the German reprocessing plant for light-water reactor fuels currently under construction in Wackersdorf. The individual contributions were separately adapted for the INIS and EDB data banks. (RB) [de

  14. Status of Pantex Plant Waste Management Project/program control system

    International Nuclear Information System (INIS)

    Price, Wesley J.; Matthews, William L.

    1992-01-01

    During a December 1990 Waste Management Program Review held in Albuquerque, New Mexico, the Waste Management and Operational Surety Division (WMOSD) introduced the project control system to be used for the Waste Management (WM) Operations Program. The system was entitled 'TRAC-WM' (Tracking and Control for Waste Management). The stated objective for this system was to establish a frame work for planning, managing, and controlling work within the WM program. As a result Mason and Hanger (the operating contractor at the Pantex Plant) initiated the development of a computerized waste management project tracking system. (author)

  15. Parachute Creek Shale Oil Program Environmental Monitoring Program. Quarterly report, fourth quarter, October 1-December 31, 1991

    International Nuclear Information System (INIS)

    1992-01-01

    The Energy Security Act of 1980 established a program to provide financial assistance to private industry in the construction and operation of commercial-scale synthetic fuels plants. The Parachute Creek Shale Oil Program is one of four projects awarded financial assistance. The Program agreed to comply with existing environmental monitoring regulations and to develop an Environmental Monitoring Plan (EMP) incorporating supplemental monitoring in the areas of water, air, solid waste, and worker health and safety during the period 1985-1992. These activities are described in a series of quarterly and annual reports. The document contains environmental compliance data collected in the fourth quarter of 1991, contents of reports on compliance data submitted to regulatory agencies, and supplemental analytical results from retorted shale pile runoff water collected following a storm event during the third quarter of 1991

  16. Kazakhstan participation in International Experimental Reactor ITER Construction project. Work status and prospects

    International Nuclear Information System (INIS)

    Tazhibayeva, I.L.; Tukhvatullin, Sh.T.; Shestakov, V.P.; Kuznetsov, B.A.

    2002-01-01

    Kazakhstan takes part in ITER project in partnership with Russian Federation since the year of 1994. At present the technical stage of the project is completed and ITER Council should take a decision on the site for international reactor. Four countries such as Canada, Japan, Spain and France have offered their territories for being used as site for launching ITER construction. ITER partners started preparing new international agreement that will cover activities on construction, operation and decommissioning of ITER. It will also include the list of research and experimental work that is conducted in support of ITER project. Kazakhstan has already made an important contribution into technical stage realization of ITER project due to scientific and technical researches conducted by National Nuclear Center, by Institute of Experimental and Theoretical Physics and by JSC 'Ulba Metallurgical plant' ('UMP'). Research activity carried out for the support of ITER project is performed in accordance with the following main trends: Tritium safety (permeability and retentin of hydrogen isotopes during in-pile irradiation in various structural materials, co-deposed layers and protective coatings); Verification of computer codes (LOCA type) loss of coolant accidents modeling in ITER reactor; Investigation of liquid metal blanket of thermonuclear reactor (tritium production in lithium containing eutectics Li17Pb83 and ceramics Li 2 TiO 3 , study of tritium permeability). At present the working group of ITER project participants started introducing proposals for cost distribution and for placing the orders on reactor construction. Further Kazakhstan participation in ITER project may be in manufacturing high-tech parts and assemblies from commercial grades of beryllium. They will be used for armouring the reactor first wall, for its thermal protection and for protection of superconductor's components for magnetic systems that are at JSC U MP'. Scientific and technical support of

  17. Quarterly coal report, July--September 1998

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-02-01

    The Quarterly Coal Report (QCR) provides comprehensive information about US coal production, distribution, exports, imports, receipts, prices, consumption, and stocks to a wide audience, including Congress, Federal and State agencies, the coal industry, and the general public. Coke production, consumption, distribution, imports, and exports data are also provided. This report presents detailed quarterly data for July through September 1998 and aggregated quarterly historical data for 1992 through the second quarter of 1998. 58 tabs.

  18. [Evaluation of the socioeconomic status in epidemiological surveys: hypotheses of research in the Brianza area MONICA project].

    Science.gov (United States)

    Cesana, G C; Ferrario, M; De Vito, G; Sega, R; Grieco, A

    1995-01-01

    Socio-economic status (SES) has been reported as a causative factor of increasing health inequalities in industrialized countries. The phenomenon has been particularly investigated for job related diseases, including cardiovascular disease and risk. The group of occupational medicine specialists in the world wide MONItoring program of CARdiovascular disease (WHO-MONICA Project) is now producing a number of hypotheses about the application of internationally defined criteria and tools for SES evaluation in the Italian area of the Project, Area Brianza. After a short review of some main conceptual and methodological problems, a proposal is presented of an SES index, derived from the pooled data of two population surveys carried out in this area. From a randomized sample of 3200 residents, 25-64 years old, stratified by sex and age decade, 1731 subjects, 594 females and 1137 males, employed at the time of the screening were extracted. Four variables were considered: age, education, occupational level and job-strain (according to the Karasek-Theorell model) by which each subject was classified in three levels--high, medium, low--of education and occupation, whose combination was used to obtain as many levels of socio-economic status. This a method of building an SES index is based on a sequence of approximations following two essential criteria: limitation of the variables to be surveyed, through standardized procedures; ability to identify the "low" SES category, presumably more at risk for disease.

  19. Status report of the nuclear data project at McMaster University. December 1998 - present

    International Nuclear Information System (INIS)

    Singh, B.

    2001-01-01

    This report covers the state of the art of the nuclear data project, covering the chains in ENSDF data of permanent interest and the data published and submitted since 1998. The new activities, compilation data and work in progress are described, and data related publications are cited

  20. Conservation status of polar bears (Ursus maritimus) in relation to projected sea-ice declines

    Science.gov (United States)

    Laidre, K. L.; Regehr, E. V.; Akcakaya, H. R.; Amstrup, S. C.; Atwood, T.; Lunn, N.; Obbard, M.; Stern, H. L., III; Thiemann, G.; Wiig, O.

    2016-12-01

    Loss of Arctic sea ice due to climate change is the most serious threat to polar bears (Ursus maritimus) throughout their circumpolar range. We performed a data-based sensitivity analysis with respect to this threat by evaluating the potential response of the global polar bear population to projected sea-ice conditions. We conducted 1) an assessment of generation length for polar bears, 2) developed of a standardized sea-ice metric representing important habitat characteristics for the species; and 3) performed population projections over three generations, using computer simulation and statistical models representing alternative relationships between sea ice and polar bear abundance. Using three separate approaches, the median percent change in mean global population size for polar bears between 2015 and 2050 ranged from -4% (95% CI = -62%, 50%) to -43% (95% CI = -76%, -20%). Results highlight the potential for large reductions in the global population if sea-ice loss continues. They also highlight the large amount of uncertainty in statistical projections of polar bear abundance and the sensitivity of projections to plausible alternative assumptions. The median probability of a reduction in the mean global population size of polar bears greater than 30% over three generations was approximately 0.71 (range 0.20-0.95. The median probability of a reduction greater than 50% was approximately 0.07 (range 0-0.35), and the probability of a reduction greater than 80% was negligible.