WorldWideScience

Sample records for quality process plan

  1. Process quality planning of quality function deployment for carrot syrup

    Science.gov (United States)

    Ekawati, Yurida; Noya, Sunday; Widjaja, Filemon

    2017-06-01

    Carrot products are rarely available in the market. Based on previous research that had been done using QFD to generate product design of carrots products, the research to produce the process quality planning had been carried out. The carrot product studied was carrot syrup. The research resulted in a process planning matrix for carrot syrup. The matrix gives information about critical process plan and the priority of the critical process plan. The critical process plan on the production process of carrot syrup consists of carrots sorting, carrots peeling, carrots washing, blanching process, carrots cutting, the making of pureed carrots, filtering carrot juice, the addition of sugar in carrot juice, the addition of food additives in carrot juice, syrup boiling, syrup filtering, syrup filling into the bottle, the bottle closure and cooling. The information will help the design of the production process of carrot syrup.

  2. Integration of air quality-related planning processes : report

    International Nuclear Information System (INIS)

    2004-05-01

    Several communities in British Columbia have conducted air quality, greenhouse gas, or community energy management plans. This report explored the possibility of integrating 3 community-based air quality-related planning processes into a single process and evaluated the use of these 3 processes by local governments and First Nations in identifying and addressing air quality-related objectives, and determined to what extent they could be integrated to achieve planning objectives for air quality, greenhouse gas emissions, and energy supply and conservation. The lessons learned from 9 case studies in British Columbia were presented. The purpose of the case studies was to examine how communities handled emissions and energy related inventory and planning work, as well as their experiences with, or considerations for, an integrated process. The lessons were grouped under several key themes including organization and stakeholder involvement; messaging and focus; leadership/champions; and resources and capacity. The report also outlined a framework for an integrated planning process and provided recommendations regarding how an integrated or complementary process could be performed. A number of next steps were also offered for the provincial government to move the concept of an integrated process forward with the assistance of other partners. These included identifying the resources required to support communities engaging in an integrated process as well as discussing the series of options for provincial support with key stakeholders. refs., tabs., figs

  3. 324 Facility B-Cell quality process plan

    International Nuclear Information System (INIS)

    Carlson, J.L.

    1998-01-01

    This report documents the quality process plan for the restart of a hot cell in the B Plant, originally a bismuth phosphate processing facility, but later converted to a waste fractionation plant. B-Cell is currently being cleaned out and deactivated. TPA Milestone M-89-02 dictates that all mixed waste and equipment be removed from B-Cell by 5/31/1999. This report describes the major activities that remain for completion of the TPA milestone

  4. Sampling Plans for Monitoring Quality Control Process at a Plastic ...

    African Journals Online (AJOL)

    This paper explores the problem of high quality cost at a medium –sized firm manufacturing various types and sizes of plastic container, using a real life data. In pursuance of their quality objectives, the company established a policy that dictates and expensive and time-consuming post-manufacturing process. While the ...

  5. sampling plans for monitoring quality control process at a plastic

    African Journals Online (AJOL)

    Dr Obe

    AT A PLASTIC MANUFACTURING FIRM IN NIGERIA: A CASE STUDY. By. E.A. Onyeagoro ... manufacture similar products, so that each company ... monitoring of production to maintain process ... concept of designing quality into product, with.

  6. Achieving performance breakthroughs in an HMO business process through quality planning.

    Science.gov (United States)

    Hanan, K B

    1993-01-01

    Kaiser Permanente's Georgia Region commissioned a quality planning team to design a new process to improve payments to its suppliers and vendors. The result of the team's effort was a 73 percent reduction in cycle time. This team's experiences point to the advantages of process redesign as a quality planning model, as well as some general guidelines for its most effective use in teams. If quality planning project teams are carefully configured, sufficiently expert in the existing process, and properly supported by management, organizations can achieve potentially dramatic improvements in process performance using this approach.

  7. A-Cell equipment removal quality process plan

    International Nuclear Information System (INIS)

    TAKASUMI, D.S.

    1999-01-01

    This document establishes the quality assuring activities used to manage the 324 building A-Cell equipment removal activity. This activity will package, remove, transport and dispose of the equipment in A-Cell. This document is provided to ensure that appropriate and effective quality assuring activities have been incorporated into the work controlling documentation and procedures

  8. Influence of the demand information quality on planning process accuracy in supply chain. Case studies

    Directory of Open Access Journals (Sweden)

    Natalia Szozda

    2013-06-01

    Full Text Available Background: Identification and analysis of factors that affect the accuracy of demand planning process across the supply chain is one of the most important problems which influence the effectiveness of its material and information flows. Material and methods: On the basis of demand planning process investigation authors define the main elements affecting the right supply chain performance level and investigate the possible connections between demand information quality and demand planning process accuracy. Later, an overview of some recent developments in the analyzed research area is provided. Results: Based on the literature review, there is described the defined factors impact on the accuracy of demand plan in each echelon for case companies. There are considered three cases. The examples illustrate supply chains of different manufacturing companies. The focus is placed on demand planning across the supply chains. The issue of determining the accuracy of future sales plans in each echelon of supply chains and factors affecting it are raised. Taking into account the case companies demand planning process analyses, there are defined possible quality measures, that are possible to be used when forecasting the customer demand. Conclusions: One of the most important and difficult planning area in the companies is becoming planning demand. Errors in planning are reflected not just in the business resource planning but also in the entire supply chain. Presented cases show that many factors affect the proper demand planning process in the supply chain, like e.g.  information technologies, lead-time, or number of supplied materials. As it can be seen from the case studies, the model of collecting information from the market plays an important role in the demand planning process.

  9. 324 Facility B-Cell quality process plan

    International Nuclear Information System (INIS)

    Carlson, J.L.

    1998-01-01

    B-Cell is currently being cleaned out (i.e., removal of equipment, fixtures and residual radioactive materials) and deactivated. TPA Milestone M-89-02 dictates that all mixed waste and equipment be removed from B-Cell by 5/31/99. The following sections describe the major activities that remain for completion of the TPA milestone. This includes: (1) Size Reduce Tank 119 and Miscellaneous Equipment. This activity is the restart of hotwork in B-Cell to size reduce the remainder of Tank 119 and other miscellaneous pieces of equipment into sizes that can be loaded into a grout container. This activity also includes the process of preparing the containers for shipment from the cell. The specific activities and procedures used are detailed in a table. (2) Load and Ship Low-Level Waste. This activity covers the process of taking a grouted LLW container from B-Cell and loading it into the cask in the REC airlock and Cask Handling Area (CHA) for shipment to the LLBG. The detailed activities and procedures for this part of cell cleanout are included in second table

  10. Influence of the demand information quality on planning process accuracy in supply chain. Case studies

    OpenAIRE

    Natalia Szozda; Sylwia Werbińska-Wojciechowska

    2013-01-01

    Background: Identification and analysis of factors that affect the accuracy of demand planning process across the supply chain is one of the most important problems which influence the effectiveness of its material and information flows. Material and methods: On the basis of demand planning process investigation authors define the main elements affecting the right supply chain performance level and investigate the possible connections between demand information quality and demand plannin...

  11. Use of the decision quality process for strategic planning in the Duri Field, Indonesia

    International Nuclear Information System (INIS)

    Neal, L. Jr.

    1994-01-01

    Strategic planning and rigorous decision analysis applications will be primary management tools for upstream companies in the 1990's. Merging the long term focus of a strategic planning process with the probabilistic output of decision analysis techniques can yield insightful views of the potential successes and failures of a business plan. Even with these insights, comparing and deciding among a group of alternatives will remain a difficult task. In addition to uncertainties, business partners do not always share common value measures. Marketers want more barrels to sell, field supervisors like low operating cost strategies, and stockholders like cashflow. This environment complicates the managers' ability to choose between available options. The Decision Quality Process, a combination of classical decision analysis techniques coupled with Quality Improvement (QI) principles, bridges this gap. The process allows managers to develop and decide between different long term strategic plans, explicitly accounting for uncertainties, unknowns, and differing value measures. Three teams consisting of engineers, geologists, front line managers, and the highest levels of management within Caltex Pacific Indonesia, Texaco, and Chevron, spent 18 months developing and evaluating a multitude of development scenarios for the Duri Field. More than 200,000 cases of economics were run to support the evaluation. The result was a significant increase in expected value for the field regardless of the value measure used

  12. Use of statistic control of the process as part of a quality assurance plan

    International Nuclear Information System (INIS)

    Acosta, S.; Lewis, C.

    2013-01-01

    One of the technical requirements of the standard IRAM ISO 17025 for the accreditation of testing laboratories, is the assurance of the quality of the results through the control and monitoring of the factors influencing the reliability of them. The grade the factors contribute to the total measurement uncertainty, determines which of them should be considered when developing a quality assurance plan. The laboratory of environmental measurements of strontium-90 in the accreditation process, performs most of its determinations in samples with values close to the detection limit. For this reason the correct characterization of the white, is a critical parameter and is verified through a letter for statistical process control. The scope of the present work is concerned the control of whites and so it was collected a statistically significant amount of data, for a period of time that is covered of different conditions. This allowed consider significant variables in the process, such as temperature and humidity, and build a graph of white control, which forms the basis of a statistical process control. The data obtained were lower and upper limits for the preparation of the charter white control. In this way the process of characterization of white was considered to operate under statistical control and concludes that it can be used as part of a plan of insurance of the quality

  13. Simulation of textile manufacturing processes for planning, scheduling, and quality control purposes

    Science.gov (United States)

    Cropper, A. E.; Wang, Z.

    1995-08-01

    Simulation, as a management information tool, has been applied to engineering manufacture and assembly operations. The application of the principles to textile manufacturing (fiber to fabric) is discussed. The particular problems and solutions in applying the simulation software package to the yarn production processes are discussed with an indication of how the software achieves the production schedule. The system appears to have application in planning, scheduling, and quality assurance. The latter being a result of the traceability possibilities through a process involving mixing and splitting of material.

  14. Nonradioactive Dangerous Waste Landfill sampling and analysis plan and data quality objectives process summary report

    International Nuclear Information System (INIS)

    Smith, R.C.

    1997-08-01

    This sampling and analysis plan defines the sampling and analytical activities and associated procedures that will be used to support the Nonradioactive Dangerous Waste Landfill soil-gas investigation. This SAP consists of three sections: this introduction, the field sampling plan, and the quality assurance project plan. The field sampling plan defines the sampling and analytical methodologies to be performed

  15. Planning for design quality

    International Nuclear Information System (INIS)

    Marguglio, B.W.

    1977-01-01

    In the nuclear industry and in other high technology industries in which the Government serves as either a customer or a regulator, it is almost always required that the contractor prepare a Quality Program Plan sometimes also referred to as a Quality Program Index. Often, the Quality Program Plan is included as part of the contractor's proposal in response to the Government's or a prime contractor's Request for Proposal. At this stage, the Quality Program Plan serves to demonstrate to the prospective customer the availability of the various quality systems. It provides the customer with a commitment as to the use of these quality systems, thus giving greater assurance that the customer's overall quality and design requirements can be met. The Quality Program Plan is contributing to the salability of the proposal. 1 ref

  16. Using IT to improve quality at NewYork-Presybterian Hospital: a requirements-driven strategic planning process.

    Science.gov (United States)

    Kuperman, Gilad J; Boyer, Aurelia; Cole, Curt; Forman, Bruce; Stetson, Peter D; Cooper, Mary

    2006-01-01

    At NewYork-Presbyterian Hospital, we are committed to the delivery of high quality care. We have implemented a strategic planning process to determine the information technology initiatives that will best help us improve quality. The process began with the creation of a Clinical Quality and IT Committee. The Committee identified 2 high priority goals that would enable demonstrably high quality care: 1) excellence at data warehousing, and 2) optimal use of automated clinical documentation to capture encounter-related quality and safety data. For each high priority goal, a working group was created to develop specific recommendations. The Data Warehousing subgroup has recommended the implementation of an architecture management process and an improved ability for users to get access to aggregate data. The Structured Documentation subgroup is establishing recommendations for a documentation template creation process. The strategic planning process at times is slow, but assures that the organization is focusing on the information technology activities most likely to lead to improved quality.

  17. The rhetoric and realities of integrating air quality into the local transport planning process in English local authorities.

    Science.gov (United States)

    Olowoporoku, Dotun; Hayes, Enda; Longhurst, James; Parkhurst, Graham

    2012-06-30

    Regardless of its intent and purposes, the first decade of the Local Air Quality Management (LAQM) framework had little or no effect in reducing traffic-related air pollution in the UK. Apart from the impact of increased traffic volumes, the major factor attributed to this failure is that of policy disconnect between the process of diagnosing air pollution and its management, thereby limiting the capability of local authorities to control traffic-related sources of air pollution. Integrating air quality management into the Local Transport Plan (LTP) process therefore presents opportunities for enabling political will, funding and joined-up policy approach to reduce this limitation. However, despite the increased access to resources for air quality measures within the LTP process, there are local institutional, political and funding constraints which reduce the impact of these policy interventions on air quality management. This paper illustrate the policy implementation gaps between central government policy intentions and the local government process by providing evidence of the deprioritisation of air quality management compared to the other shared priorities in the LTP process. We draw conclusions on the policy and practice of integrating air quality management into transport planning. The evidence thereby indicate the need for a policy shift from a solely localised hotspot management approach, in which the LAQM framework operates, to a more holistic management of vehicular emissions within wider spatial administrative areas. Copyright © 2012 Elsevier Ltd. All rights reserved.

  18. Planning product quality: An example - ornamental plants

    Directory of Open Access Journals (Sweden)

    Kovačević Miodrag

    2003-01-01

    Full Text Available The industry of ornamental plants is a subject of quality planning. The quality plan is a document setting out the specific quality practices in ornamental plants production. That plan introduce organizational structure procedures, processes and resources needed to implement quality in life cycle of product chain. For engineers it represents a new tool.

  19. Quality initiatives: planning, setting up, and carrying out radiology process improvement projects.

    Science.gov (United States)

    Tamm, Eric P; Szklaruk, Janio; Puthooran, Leejo; Stone, Danna; Stevens, Brian L; Modaro, Cathy

    2012-01-01

    In the coming decades, those who provide radiologic imaging services will be increasingly challenged by the economic, demographic, and political forces affecting healthcare to improve their efficiency, enhance the value of their services, and achieve greater customer satisfaction. It is essential that radiologists master and consistently apply basic process improvement skills that have allowed professionals in many other fields to thrive in a competitive environment. The authors provide a step-by-step overview of process improvement from the perspective of a radiologic imaging practice by describing their experience in conducting a process improvement project: to increase the daily volume of body magnetic resonance imaging examinations performed at their institution. The first step in any process improvement project is to identify and prioritize opportunities for improvement in the work process. Next, an effective project team must be formed that includes representatives of all participants in the process. An achievable aim must be formulated, appropriate measures selected, and baseline data collected to determine the effects of subsequent efforts to achieve the aim. Each aspect of the process in question is then analyzed by using appropriate tools (eg, flowcharts, fishbone diagrams, Pareto diagrams) to identify opportunities for beneficial change. Plans for change are then established and implemented with regular measurements and review followed by necessary adjustments in course. These so-called PDSA (planning, doing, studying, and acting) cycles are repeated until the aim is achieved or modified and the project closed.

  20. PLANNING QUALITY ASSURANCE PROCESSES IN A LARGE SCALE GEOGRAPHICALLY SPREAD HYBRID SOFTWARE DEVELOPMENT PROJECT

    Directory of Open Access Journals (Sweden)

    Святослав Аркадійович МУРАВЕЦЬКИЙ

    2016-02-01

    Full Text Available There have been discussed key points of operational activates in a large scale geographically spread software development projects. A look taken at required QA processes structure in such project. There have been given up to date methods of integration quality assurance processes into software development processes. There have been reviewed existing groups of software development methodologies. Such as sequential, agile and based on RPINCE2. There have been given a condensed overview of quality assurance processes in each group. There have been given a review of common challenges that sequential and agile models are having in case of large geographically spread hybrid software development project. Recommendations were given in order to tackle those challenges.  The conclusions about the best methodology choice and appliance to the particular project have been made.

  1. Instituting organizational learning for quality improvement through strategic planning nominal group processes.

    Science.gov (United States)

    White, D B

    2000-01-01

    Healthcare managers are faced with unprecedented challenges as characterized by managed care constraints, downsizing, increased client needs, and a society demanding more responsive services. Managers must initiate change for quality, efficiency, and survival. This article provides information and strategies for (a) assessing the change readiness of an organization, (b) conducting an organizational diagnosis, (c) instituting a team culture, (d) developing a change strategy, (e) integrating the strategy with a quality improvement process, and (f) identifying the leadership skills to implement organization renewal. Nominal group processes, namely, SWOT and the Search Conference, are described, and case examples are provided. The implementation strategies have been used successfully in a variety of milieus; practical advice for success is described in detail.

  2. Region 7 Quality Management Plan

    Science.gov (United States)

    To document adherence to EPA Order 5360.1 A2, EPA requires each organizational unitto develop a quality management plan per the specifications in EPA Requirements for QualityManagement Plans, EPA QA R-2.

  3. Research Planning Process

    Science.gov (United States)

    Lofton, Rodney

    2010-01-01

    This presentation describes the process used to collect, review, integrate, and assess research requirements desired to be a part of research and payload activities conducted on the ISS. The presentation provides a description of: where the requirements originate, to whom they are submitted, how they are integrated into a requirements plan, and how that integrated plan is formulated and approved. It is hoped that from completing the review of this presentation, one will get an understanding of the planning process that formulates payload requirements into an integrated plan used for specifying research activities to take place on the ISS.

  4. Waste Management Quality Assurance Plan

    International Nuclear Information System (INIS)

    2006-01-01

    The WMG QAP is an integral part of a management system designed to ensure that WMG activities are planned, performed, documented, and verified in a manner that assures a quality product. A quality product is one that meets all waste acceptance criteria, conforms to all permit and regulatory requirements, and is accepted at the offsite treatment, storage, and disposal facility. In addition to internal processes, this QA Plan identifies WMG processes providing oversight and assurance to line management that waste is managed according to all federal, state, and local requirements for waste generator areas. A variety of quality assurance activities are integral to managing waste. These QA functions have been identified in the relevant procedures and in subsequent sections of this plan. The WMG QAP defines the requirements of the WMG quality assurance program. These requirements are derived from Department of Energy (DOE) Order 414.1C, Quality Assurance, Contractor Requirements Document, the LBNL Operating and Assurance Program Plan (OAP), and other applicable environmental compliance documents. The QAP and all associated WMG policies and procedures are periodically reviewed and revised, as necessary, to implement corrective actions, and to reflect changes that have occurred in regulations, requirements, or practices as a result of feedback on work performed or lessons learned from other organizations. The provisions of this QAP and its implementing documents apply to quality-affecting activities performed by the WMG; WMG personnel, contractors, and vendors; and personnel from other associated LBNL organizations, except where such contractors, vendors, or organizations are governed by their own WMG-approved QA programs

  5. Air quality management planning (AQMP

    Directory of Open Access Journals (Sweden)

    Sivertsen Bjarne

    2012-01-01

    Full Text Available In most urban areas of the world, particulate matter (PM levels pose severe problems, addressed in several policy areas (air quality, climate change, and human health. PM presents multiple challenges due to the multitude of its sources, spanning many sectors of economic activity as well as nature, and due to the complexity of atmospheric processes involved in its transport and secondary formation. For the authorities, the goal is to assure minimal impacts of atmospheric PM levels, in practice represented by compliance with existing regulations and standards. This may be achieved through an air quality management plan (AQMP. In Northern America and in parts of Europe, comprehensive research programs have guided development of AQMP over the last forty years. This cumulated experience can be utilized by others who face the same problems, but have yet to develop their own substantial research base. The main purpose of the AQMP development process is to establish an effective and sound basis for planning and management of air quality in a selected area. This type of planning will ensure that significant sources of impacts are identified and controlled in a most cost-effective manner. The choice of tools, methods and input information is often dictated by their availability, and should be evaluated against current best practices. Important elements of the AQMP are the identification of sources and development of a complete emission inventory, the development and operation of an air quality monitoring programme, and the development and application of atmospheric dispersion models. Major task is to collect the necessary input data. The development of the AQMP will take into account: - Air Quality Management System (AQMS requirements; - Operational and functional structure requirements; - Source identification through emission inventories; - Source reduction alternatives, which may be implemented; - Mechanisms for facilitating interdepartmental

  6. A Process for Planning.

    Science.gov (United States)

    Gurowitz, William D.; And Others

    1988-01-01

    Describes how Division of Campus Life at Cornell University conducted long-range planning and the results of its 2-year effort. Explains 2 (strategic and organizational) by 3 (diagnosis, formulation, and execution) matrix providing systems view from describing and evaluating long-range planning. Presents 10-step process implemented at Cornell. (NB)

  7. Retail Tactical Planning: An Aligned Process?

    OpenAIRE

    Dreyer , Heidi; Dukovska-Popovska , Iskra; Kiil , Kasper; Kaipia , Riikka

    2016-01-01

    Part 9: Quality in Production Management; International audience; This paper addresses tactical planning in retailing through a case study approach in one grocery retailing company. The issues are how tactical planning is conducted and how the different plans are connected. The study complements earlier retail planning studies by showing the sequence of planning phases and by studying the fragmented plans as a process. The master category planning is important and sets borders for the other p...

  8. Process Management Plans

    Directory of Open Access Journals (Sweden)

    Tomasz Miksa

    2014-07-01

    Full Text Available In the era of research infrastructures and big data, sophisticated data management practices are becoming essential building blocks of successful science. Most practices follow a data-centric approach, which does not take into account the processes that created, analysed and presented the data. This fact limits the possibilities for reliable verification of results. Furthermore, it does not guarantee the reuse of research, which is one of the key aspects of credible data-driven science. For that reason, we propose the introduction of the new concept of Process Management Plans, which focus on the identification, description, sharing and preservation of the entire scientific processes. They enable verification and later reuse of result data and processes of scientific experiments. In this paper we describe the structure and explain the novelty of Process Management Plans by showing in what way they complement existing Data Management Plans. We also highlight key differences, major advantages, as well as references to tools and solutions that can facilitate the introduction of Process Management Plans.

  9. Project Specific Quality Assurance Plan

    International Nuclear Information System (INIS)

    Pedersen, K.S.

    1995-01-01

    This Quality Assurance Project Plan (QAPP) identifies the Westinghouse Hanford Co. (WHC) Quality Assurance (QA) program requirements for all contractors involved in the planning and execution of the design, construction, testing and inspection of the 200 Area Effluent BAT/AKART Implementation, Project W-291

  10. Quality planning in Construction Project

    Science.gov (United States)

    Othman, I.; Shafiq, Nasir; Nuruddin, M. F.

    2017-12-01

    The purpose of this paper is to investigate deeper on the factors that contribute to the effectiveness of quality planning, identifying the common problems encountered in quality planning, practices and ways for improvements in quality planning for construction projects. This paper involves data collected from construction company representatives across Malaysia that are obtained through semi-structured interviews as well as questionnaire distributions. Results shows that design of experiments (average index: 4.61), inspection (average index: 4.45) and quality audit as well as other methods (average index: 4.26) rank first, second and third most important factors respectively.

  11. SWiFT Software Quality Assurance Plan.

    Energy Technology Data Exchange (ETDEWEB)

    Berg, Jonathan Charles [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2016-01-01

    This document describes the software development practice areas and processes which contribute to the ability of SWiFT software developers to provide quality software. These processes are designed to satisfy the requirements set forth by the Sandia Software Quality Assurance Program (SSQAP). APPROVALS SWiFT Software Quality Assurance Plan (SAND2016-0765) approved by: Department Manager SWiFT Site Lead Dave Minster (6121) Date Jonathan White (6121) Date SWiFT Controls Engineer Jonathan Berg (6121) Date CHANGE HISTORY Issue Date Originator(s) Description A 2016/01/27 Jon Berg (06121) Initial release of the SWiFT Software Quality Assurance Plan

  12. The Best Laid Plans: An Examination of School Plan Quality and Implementation in a School Improvement Initiative

    Science.gov (United States)

    Strunk, Katharine O.; Marsh, Julie A.; Bush-Mecenas, Susan C.; Duque, Matthew R.

    2016-01-01

    Purpose: A common strategy used in school improvement efforts is a mandated process of formal planning, yet little is known about the quality of plans or the relationship between plan quality and implementation. This mixed-methods article investigates plan quality, factors associated with plan quality, and the relationship between plan quality and…

  13. Project Quality Plan

    DEFF Research Database (Denmark)

    Sandborg-Petersen, Ulrik; Øhrstrøm, Peter

    This document defines the procedures, standards, and strategies which will be used to ensure high standards of quality of the work produced within the HANDS project. It contains the following sections...

  14. Waste Management Quality Assurance Plan

    International Nuclear Information System (INIS)

    1993-01-01

    Lawrence Berkeley Laboratory's Environment Department addresses its responsibilities through activities in a variety of areas. The need for a comprehensive management control system for these activities has been identified by the Department of Energy (DOE). The WM QA (Waste Management Quality Assurance) Plan is an integral part of a management system that provides controls necessary to ensure that the department's activities are planned, performed, documented, and verified. This WM QA Plan defines the requirements of the WM QA program. These requirements are derived from DOE Order 5700.6C, Quality Assurance, the LBL Operating and Assurance Program Plan (OAP, LBL PUB-3111), and other environmental compliance documents applicable to WM activities. The requirements presented herein, as well as the procedures and methodologies that direct the implementation of these requirements, will undergo review and revisions as necessary. The provisions of this QA Plan and its implementing documents apply to quality-affecting activities performed by and for WM. It is also applicable to WM contractors, vendors, and other LBL organizations associated with WM activities, except where such contractors, vendors, or organizations are governed by their own WM-approved QA programs. References used in the preparation of this document are (1) ASME NQA-1-1989, (2) ANSI/ASQC E4 (Draft), (3) Waste Management Quality Assurance Implementing Management Plan (LBL PUB-5352, Rev. 1), (4) LBL Operating and Assurance Program Plan (OAP), LBL PUB-3111, 2/3/93. A list of terms and definitions used throughout this document is included as Appendix A

  15. Quality-Assurance Program Plan

    International Nuclear Information System (INIS)

    Kettell, R.A.

    1981-05-01

    This Quality Assurance Program Plan (QAPP) is provided to describe the Quality Assurance Program which is applied to the waste management activities conducted by AESD-Nevada Operations at the E-MAD Facility located in Area 25 of the Nevada Test Site. The AESD-Nevada Operations QAPP provides the necessary systematic and administrative controls to assure activities that affect quality, safety, reliability, and maintainability during design, procurement, fabrication, inspection, shipments, tests, and storage are conducted in accordance with established requirements

  16. Business process quality management

    NARCIS (Netherlands)

    Reijers, H.A.; Mendling, J.; Recker, J.; Brocke, vom J.; Rosemann, M.

    2010-01-01

    Abstract Process modeling is a central element in any approach to Business Process Management (BPM). However, what hinders both practitioners and aca demics is the lack of support for assessing the quality of process models — let alone realizing high quality process models. Existing frameworks are

  17. Preoperative teaching and stoma marking in an inpatient population: a quality improvement process using a FOCUS-Plan-Do-Check-Act model.

    Science.gov (United States)

    Zimnicki, Katherine M

    2015-01-01

    Preoperative teaching and stoma marking are supported by research and included in clinical practice guidelines from the WOCN Society and others. Using a FOCUS-Plan-Do-Check-Act model of Total Quality Management, a multidisciplinary team was formed that developed a flow chart outlining the process of care for patients undergoing planned ostomy surgery that included an educational intervention that enabled staff nurses to perform preoperative stoma site marking and education. After 3 months, we found a statistically significant increase in the number of surgical patients who received these evidence-based interventions (14% vs 64%; χ = 9.32; P = .002).

  18. Quality Assurance Project Plan for Facility Effluent Monitoring Plan activities

    International Nuclear Information System (INIS)

    Frazier, T.P.

    1994-01-01

    This Quality Assurance Project Plan addresses the quality assurance requirements for the activities associated with the Facility Effluent Monitoring Plans, which are part of the overall Hanford Site Environmental Protection Plan. This plan specifically applies to the sampling and analysis activities and continuous monitoring performed for all Facility Effluent Monitoring Plan activities conducted by Westinghouse Hanford Company. It is generic in approach and will be implemented in conjunction with the specific requirements of the individual Facility Effluent Monitoring Plans

  19. Quality Assurance Project Plan for Citizen Science Projects

    Science.gov (United States)

    The Quality Assurance Project Plan is necessary for every project that collects or uses environmental data. It documents the project planning process and serves as a blueprint for how your project will run.

  20. 40 CFR 130.5 - Continuing planning process.

    Science.gov (United States)

    2010-07-01

    ... QUALITY PLANNING AND MANAGEMENT § 130.5 Continuing planning process. (a) General. Each State shall establish and maintain a continuing planning process (CPP) as described under section 303(e)(3)(A)-(H) of... 40 Protection of Environment 21 2010-07-01 2010-07-01 false Continuing planning process. 130.5...

  1. Use of statistic control of the process as part of a quality assurance plan; Empleo del control estadistico de proceso como parte de un plan de aseguramiento de la calidad

    Energy Technology Data Exchange (ETDEWEB)

    Acosta, S.; Lewis, C., E-mail: sacosta@am.gob.ar [Autoridad Regulatoria Nuclear (ARN), Buenos Aires (Argentina)

    2013-07-01

    One of the technical requirements of the standard IRAM ISO 17025 for the accreditation of testing laboratories, is the assurance of the quality of the results through the control and monitoring of the factors influencing the reliability of them. The grade the factors contribute to the total measurement uncertainty, determines which of them should be considered when developing a quality assurance plan. The laboratory of environmental measurements of strontium-90 in the accreditation process, performs most of its determinations in samples with values close to the detection limit. For this reason the correct characterization of the white, is a critical parameter and is verified through a letter for statistical process control. The scope of the present work is concerned the control of whites and so it was collected a statistically significant amount of data, for a period of time that is covered of different conditions. This allowed consider significant variables in the process, such as temperature and humidity, and build a graph of white control, which forms the basis of a statistical process control. The data obtained were lower and upper limits for the preparation of the charter white control. In this way the process of characterization of white was considered to operate under statistical control and concludes that it can be used as part of a plan of insurance of the quality.

  2. A fully electronic intensity-modulated radiation therapy quality assurance (IMRT QA) process implemented in a network comprised of independent treatment planning, record and verify, and delivery systems

    International Nuclear Information System (INIS)

    Bailey, Daniel W; Kumaraswamy, Lalith; Podgorsak, Matthew B

    2010-01-01

    The purpose of this study is to implement an electronic method to perform and analyze intensity-modulated radiation therapy quality assurance (IMRT QA) using an aSi megavoltage electronic portal imaging device in a network comprised of independent treatment planning, record and verify (R&V), and delivery systems. A verification plan was generated in the treatment planning system using the actual treatment plan of a patient. After exporting the treatment fields to the R&V system, the fields were delivered in QA mode with the aSi imager deployed. The resulting dosimetric images are automatically stored in a DICOM-RT format in the delivery system treatment console computer. The relative dose density images are subsequently pushed to the R&V system. The absolute dose images are then transferred electronically from the treatment console computer to the treatment planning system and imported into the verification plan in the dosimetry work space for further analysis. Screen shots of the gamma evaluation and isodose comparison are imported into the R&V system as an electronic file (e.g. PDF) to be reviewed prior to initiation of patient treatment. A relative dose image predicted by the treatment planning system can also be sent to the R&V system to be compared with the relative dose density image measured with the aSi imager. Our department does not have integrated planning, R&V, and delivery systems. In spite of this, we are able to fully implement a paperless and filmless IMRT QA process, allowing subsequent analysis and approval to be more efficient, while the QA document is directly attached to its specific patient chart in the R&V system in electronic form. The calculated and measured relative dose images can be compared electronically within the R&V system to analyze the density differences and ensure proper dose delivery to patients. In the absence of an integrated planning, verifying, and delivery system, we have shown that it is nevertheless possible to develop a

  3. Sandia software guidelines: Software quality planning

    Energy Technology Data Exchange (ETDEWEB)

    1987-08-01

    This volume is one in a series of Sandia Software Guidelines intended for use in producing quality software within Sandia National Laboratories. In consonance with the IEEE Standard for Software Quality Assurance Plans, this volume identifies procedures to follow in producing a Software Quality Assurance Plan for an organization or a project, and provides an example project SQA plan. 2 figs., 4 tabs.

  4. Process air quality data

    Science.gov (United States)

    Butler, C. M.; Hogge, J. E.

    1978-01-01

    Air quality sampling was conducted. Data for air quality parameters, recorded on written forms, punched cards or magnetic tape, are available for 1972 through 1975. Computer software was developed to (1) calculate several daily statistical measures of location, (2) plot time histories of data or the calculated daily statistics, (3) calculate simple correlation coefficients, and (4) plot scatter diagrams. Computer software was developed for processing air quality data to include time series analysis and goodness of fit tests. Computer software was developed to (1) calculate a larger number of daily statistical measures of location, and a number of daily monthly and yearly measures of location, dispersion, skewness and kurtosis, (2) decompose the extended time series model and (3) perform some goodness of fit tests. The computer program is described, documented and illustrated by examples. Recommendations are made for continuation of the development of research on processing air quality data.

  5. Microbiological, Geochemical and Hydrologic Processes Controlling Uranium Mobility: An Integrated Field-Scale Subsurface Research Challenge Site at Rifle, Colorado, Quality Assurance Project Plan

    Energy Technology Data Exchange (ETDEWEB)

    Fix, N. J.

    2008-01-07

    The U.S. Department of Energy (DOE) is cleaning up and/or monitoring large, dilute plumes contaminated by metals, such as uranium and chromium, whose mobility and solubility change with redox status. Field-scale experiments with acetate as the electron donor have stimulated metal-reducing bacteria to effectively remove uranium [U(VI)] from groundwater at the Uranium Mill Tailings Site in Rifle, Colorado. The Pacific Northwest National Laboratory and a multidisciplinary team of national laboratory and academic collaborators has embarked on a research proposed for the Rifle site, the object of which is to gain a comprehensive and mechanistic understanding of the microbial factors and associated geochemistry controlling uranium mobility so that DOE can confidently remediate uranium plumes as well as support stewardship of uranium-contaminated sites. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the Rifle Integrated Field-Scale Subsurface Research Challenge Project.

  6. Microbiological, Geochemical and Hydrologic Processes Controlling Uranium Mobility: An Integrated Field-Scale Subsurface Research Challenge Site at Rifle, Colorado, Quality Assurance Project Plan

    International Nuclear Information System (INIS)

    Fix, N. J.

    2008-01-01

    The U.S. Department of Energy (DOE) is cleaning up and/or monitoring large, dilute plumes contaminated by metals, such as uranium and chromium, whose mobility and solubility change with redox status. Field-scale experiments with acetate as the electron donor have stimulated metal-reducing bacteria to effectively remove uranium [U(VI)] from groundwater at the Uranium Mill Tailings Site in Rifle, Colorado. The Pacific Northwest National Laboratory and a multidisciplinary team of national laboratory and academic collaborators has embarked on a research proposed for the Rifle site, the object of which is to gain a comprehensive and mechanistic understanding of the microbial factors and associated geochemistry controlling uranium mobility so that DOE can confidently remediate uranium plumes as well as support stewardship of uranium-contaminated sites. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the Rifle Integrated Field-Scale Subsurface Research Challenge Project

  7. Improved Planning Time and Plan Quality Through Multicriteria Optimization for Intensity-Modulated Radiotherapy

    International Nuclear Information System (INIS)

    Craft, David L.; Hong, Theodore S.; Shih, Helen A.; Bortfeld, Thomas R.

    2012-01-01

    Purpose: To test whether multicriteria optimization (MCO) can reduce treatment planning time and improve plan quality in intensity-modulated radiotherapy (IMRT). Methods and Materials: Ten IMRT patients (5 with glioblastoma and 5 with locally advanced pancreatic cancers) were logged during the standard treatment planning procedure currently in use at Massachusetts General Hospital (MGH). Planning durations and other relevant planning information were recorded. In parallel, the patients were planned using an MCO planning system, and similar planning time data were collected. The patients were treated with the standard plan, but each MCO plan was also approved by the physicians. Plans were then blindly reviewed 3 weeks after planning by the treating physician. Results: In all cases, the treatment planning time was vastly shorter for the MCO planning (average MCO treatment planning time was 12 min; average standard planning time was 135 min). The physician involvement time in the planning process increased from an average of 4.8 min for the standard process to 8.6 min for the MCO process. In all cases, the MCO plan was blindly identified as the superior plan. Conclusions: This provides the first concrete evidence that MCO-based planning is superior in terms of both planning efficiency and dose distribution quality compared with the current trial and error–based IMRT planning approach.

  8. Information management in process planning

    NARCIS (Netherlands)

    Lutters, Diederick; Wijnker, T.C.; Kals, H.J.J.

    1999-01-01

    A recently proposed reference model indicates the use of structured information as the basis for the control of design and manufacturing processes. The model is used as a basis to describe the integration of design and process planning. A differentiation is made between macro- and micro process

  9. 222-S laboratory quality assurance plan

    International Nuclear Information System (INIS)

    Meznarich, H.K.

    1995-01-01

    This document provides quality assurance guidelines and quality control requirements for analytical services. This document is designed on the basis of Hanford Analytical Services Quality Assurance Plan (HASQAP) technical guidelines and is used for governing 222-S and 222-SA analytical and quality control activities. The 222-S Laboratory provides analytical services to various clients including, but not limited to, waste characterization for the Tank Waste Remediation Systems (TWRS), waste characterization for regulatory waste treatment, storage, and disposal (TSD), regulatory compliance samples, radiation screening, process samples, and TPA samples. A graded approach is applied on the level of sample custody, QC, data verification, and data reporting to meet the specific needs of the client

  10. Hanford Tanks Initiative quality assurance implementation plan

    International Nuclear Information System (INIS)

    Huston, J.J.

    1998-01-01

    Hanford Tanks Initiative (HTI) Quality Assurance Implementation Plan for Nuclear Facilities defines the controls for the products and activities developed by HTI. Project Hanford Management Contract (PHMC) Quality Assurance Program Description (QAPD)(HNF-PRO599) is the document that defines the quality requirements for Nuclear Facilities. The QAPD provides direction for compliance to 10 CFR 830.120 Nuclear Safety Management, Quality Assurance Requirements. Hanford Tanks Initiative (HTI) is a five-year activity resulting from the technical and financial partnership of the US Department of Energy's Office of Waste Management (EM-30), and Office of Science and Technology Development (EM-50). HTI will develop and demonstrate technologies and processes for characterization and retrieval of single shell tank waste. Activities and products associated with HTI consist of engineering, construction, procurement, closure, retrieval, characterization, and safety and licensing

  11. A new plan quality index for nasopharyngeal cancer SIB IMRT.

    Science.gov (United States)

    Jin, X; Yi, J; Zhou, Y; Yan, H; Han, C; Xie, C

    2014-02-01

    A new plan quality index integrating dosimetric and radiobiological indices was proposed to facilitate the evaluation and comparison of simultaneous integrated boost (SIB) intensity modulated radiotherapy (IMRT) plans for nasopharyngeal cancer (NPC) patients. Ten NPC patients treated by SIB-IMRT were enrolled in the study. Custom software was developed to read dose-volume histogram (DVH) curves from the treatment planning system (TPS). A plan filtering matrix was introduced to filter plans that fail to satisfy treatment protocol. Target plan quality indices and organ at risk (OAR) plan quality indices were calculated for qualified plans. A unique composite plan quality index (CPQI) was proposed based on the relative weight of these indices to evaluate and compare competing plans. Plan ranking results were compared with detailed statistical analysis, radiation oncology quality system (ROQS) scoring results and physician's evaluation results to verify the accuracy of this new plan quality index. The average CPQI values for plans with OAR priority of low, normal, high, and PTV only were 0.22 ± 0.08, 0.49 ± 0.077, 0.71 ± 0.062, and -0.21 ± 0.16, respectively. There were significant differences among these plan quality indices (One-way ANOVA test, p plans were selected. Plan filtering matrix was able to speed up the plan evaluation process. The new matrix plan quality index CPQI showed good consistence with physician ranking results. It is a promising index for NPC SIB-IMRT plan evaluation. Copyright © 2013 Associazione Italiana di Fisica Medica. Published by Elsevier Ltd. All rights reserved.

  12. Quality Assurance Project Plan for Facility Effluent Monitoring Plan activities

    International Nuclear Information System (INIS)

    Nickels, J.M.

    1991-06-01

    This Quality Assurance Project Plan addresses the quality assurance requirements for the Facility Monitoring Plans of the overall site-wide environmental monitoring plan. This plan specifically applies to the sampling and analysis activities and continuous monitoring performed for all Facility Effluent Monitoring Plan activities conducted by Westinghouse Hanford Company. It is generic in approach and will be implemented in conjunction with the specific requirements of individual Facility Effluent Monitoring Plans. This document is intended to be a basic road map to the Facility Effluent Monitoring Plan documents (i.e., the guidance document for preparing Facility Effluent Monitoring Plans, Facility Effluent Monitoring Plan determinations, management plan, and Facility Effluent Monitoring Plans). The implementing procedures, plans, and instructions are appropriate for the control of effluent monitoring plans requiring compliance with US Department of Energy, US Environmental Protection Agency, state, and local requirements. This Quality Assurance Project Plan contains a matrix of organizational responsibilities, procedural resources from facility or site manuals used in the Facility Effluent Monitoring Plans, and a list of the analytes of interest and analytical methods for each facility preparing a Facility Effluent Monitoring Plan. 44 refs., 1 figs., 2 tabs

  13. Quality planning for major plant design modifications

    International Nuclear Information System (INIS)

    Dulee, R.J.

    1988-01-01

    This paper reviews the approach and activities undertaken by Public Service Electric and Gas Company's (PSE and G's) nuclear quality assurance (QA) department to support major plant design modifications conducted during refueling outages at Salem Generating Station. It includes the planning and implementation of quality plans developed to provide both QA and quality control (QC) coverage of modification performed by contracted service organizations

  14. Total quality management program planning

    Energy Technology Data Exchange (ETDEWEB)

    Thornton, P.T.; Spence, K.

    1994-05-01

    As government funding grows scarce, competition between the national laboratories is increasing dramatically. In this era of tougher competition, there is no for resistance to change. There must instead be a uniform commitment to improving the overall quality of our products (research and technology) and an increased focus on our customers` needs. There has been an ongoing effort to bring the principles of total quality management (TQM) to all Energy Systems employees to help them better prepare for future changes while responding to the pressures on federal budgets. The need exists for instituting a vigorous program of education and training to an understanding of the techniques needed to improve and initiate a change in organizational culture. The TQM facilitator is responsible for educating the work force on the benefits of self-managed work teams, designing a program of instruction for implementation, and thus getting TQM off the ground at the worker and first-line supervisory levels so that the benefits can flow back up. This program plan presents a conceptual model for TQM in the form of a hot air balloon. In this model, there are numerous factors which can individually and collectively impede the progress of TQM within the division and the Laboratory. When these factors are addressed and corrected, the benefits of TQM become more visible. As this occurs, it is hoped that workers and management alike will grasp the ``total quality`` concept as an acceptable agent for change and continual improvement. TQM can then rise to the occasion and take its rightful place as an integral and valid step in the Laboratory`s formula for survival.

  15. Revision of Krsko NPP Quality Assurance Plan

    International Nuclear Information System (INIS)

    Biscan, R.; Fifnja, I.; Kavsek, D.

    2012-01-01

    International standards from nuclear power plant operation area are being frequently upgraded and revised in accordance with the continuous improvement philosophy. This philosophy applies also to the area of Quality Assurance, which has also undergone significant improvement since the early 1950s. Besides just nuclear industry, there are also other international quality standards that are being continuously developed and revised, bringing needs for upgrades also in the nuclear application. Since the beginning of Krsko NPP construction, the overall Quality Assurance program and its applicable procedures were in place to assure that all planned and systematic actions necessary to provide adequate confidence that an item or service will satisfy given requirements to quality, are in place. The overall requirements for quality as one of the major objectives for Krsko NPP operation are also set forth in the Updated Safety Analyses Report, the document that serves as a base for operating license. During more than 30 years of Krsko NPP operation, the quality requirements and related documents were revised and upgraded in several attempts. The latest revision 6 of QD-1, Quality Assurance Plan was issued during the year 2011. The bases for the revision were: Changes of the Slovenian regulatory requirements (ZVISJV, JV5, JV9?), Changes of Krsko NPP licensing documents (USAR section 13?), SNSA inspection requirements, Changes of international standards (IAEA, ISO?), Conclusions of first PSR, Implementation of ISO standards in Krsko NPP (ISO14001, ISO17025), Changes of plant procedures, etc. One of the most obvious changes was the enlargement of the QA Plan scope to cover interdisciplinary areas defined in the plant management program MD-1, such as Safety culture, Self-assessment, Human performance, Industrial Safety etc. The attachment of the QA Plan defining relationships between certain standards was also updated to provide matrix for better correlation of requirements of

  16. Quality improvement tools and processes.

    Science.gov (United States)

    Lau, Catherine Y

    2015-04-01

    The Model for Improvement and the Plan-Do-Study-Act cycle is a popular quality improvement (QI) tool for health care providers to successfully lead QI projects and redesign care processes. This tool has several distinct components that must be addressed in sequence to organize and critically evaluate improvement activities. Unlike other health sciences clinical research, QI projects and research are based on dynamic hypotheses that develop into observable, serial tests of change with continuous collection and feedback of performance data to stakeholders. Copyright © 2015 Elsevier Inc. All rights reserved.

  17. Plan delivery quality assurance for CyberKnife: Statistical process control analysis of 350 film-based patient-specific QAs.

    Science.gov (United States)

    Bellec, J; Delaby, N; Jouyaux, F; Perdrieux, M; Bouvier, J; Sorel, S; Henry, O; Lafond, C

    2017-07-01

    Robotic radiosurgery requires plan delivery quality assurance (DQA) but there has never been a published comprehensive analysis of a patient-specific DQA process in a clinic. We proposed to evaluate 350 consecutive film-based patient-specific DQAs using statistical process control. We evaluated the performance of the process to propose achievable tolerance criteria for DQA validation and we sought to identify suboptimal DQA using control charts. DQAs were performed on a CyberKnife-M6 using Gafchromic-EBT3 films. The signal-to-dose conversion was performed using a multichannel-correction and a scanning protocol that combined measurement and calibration in a single scan. The DQA analysis comprised a gamma-index analysis at 3%/1.5mm and a separate evaluation of spatial and dosimetric accuracy of the plan delivery. Each parameter was plotted on a control chart and control limits were calculated. A capability index (Cpm) was calculated to evaluate the ability of the process to produce results within specifications. The analysis of capability showed that a gamma pass rate of 85% at 3%/1.5mm was highly achievable as acceptance criteria for DQA validation using a film-based protocol (Cpm>1.33). 3.4% of DQA were outside a control limit of 88% for gamma pass-rate. The analysis of the out-of-control DQA helped identify a dosimetric error in our institute for a specific treatment type. We have defined initial tolerance criteria for DQA validations. We have shown that the implementation of a film-based patient-specific DQA protocol with the use of control charts is an effective method to improve patient treatment safety on CyberKnife. Copyright © 2017 Associazione Italiana di Fisica Medica. Published by Elsevier Ltd. All rights reserved.

  18. Checklist for Reviewing EPA Quality Management Plans

    Science.gov (United States)

    This checklist will be used to review the Quality Management Plans (QMPs) that are submitted to the Quality Staff of the Office of Environmental Information (OEI) for Agency review under EPA Order 5360.1 A2.

  19. Quality Assurance Planning for Region 9

    Science.gov (United States)

    The ultimate success of an environmental program or project depends on the quality of the environmental data collected and used in decision-making. EPA has developed guidances to help state and tribal governments develop Quality Assurance Program Plans.

  20. Internal quality control: planning and implementation strategies.

    Science.gov (United States)

    Westgard, James O

    2003-11-01

    The first essential in setting up internal quality control (IQC) of a test procedure in the clinical laboratory is to select the proper IQC procedure to implement, i.e. choosing the statistical criteria or control rules, and the number of control measurements, according to the quality required for the test and the observed performance of the method. Then the right IQC procedure must be properly implemented. This review focuses on strategies for planning and implementing IQC procedures in order to improve the quality of the IQC. A quantitative planning process is described that can be implemented with graphical tools such as power function or critical-error graphs and charts of operating specifications. Finally, a total QC strategy is formulated to minimize cost and maximize quality. A general strategy for IQC implementation is recommended that employs a three-stage design in which the first stage provides high error detection, the second stage low false rejection and the third stage prescribes the length of the analytical run, making use of an algorithm involving the average of normal patients' data.

  1. [Quality planning of Family Health Units using Quality Function Deployment (QFD)].

    Science.gov (United States)

    Volpato, Luciana Fernandes; Meneghim, Marcelo de Castro; Pereira, Antonio Carlos; Ambrosano, Gláucia Maria Bovi

    2010-08-01

    Quality is an indispensible requirement in the health field, and its pursuit is necessary in order to meet demands by a population that is aware of its rights, as part of the essence of good work relations, and to decrease technological costs. Quality thus involves all parties to the process (users and professionals), and is no longer merely an attribute of the health service. This study aimed to verify the possibility of quality planning in the Family Health Units, using Quality Function Deployment (QFD). QFD plans quality according to user satisfaction, involving staff professionals and identifying new approaches to improve work processes. Development of the array, called the House of Quality, is this method's most important characteristics. The results show a similarity between the quality demanded by users and the quality planned by professionals. The current study showed that QFD is an efficient tool for quality planning in public health services.

  2. Transuranic Waste Characterization Quality Assurance Program Plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-04-30

    This quality assurance plan identifies the data necessary, and techniques designed to attain the required quality, to meet the specific data quality objectives associated with the DOE Waste Isolation Pilot Plant (WIPP). This report specifies sampling, waste testing, and analytical methods for transuranic wastes.

  3. Transuranic Waste Characterization Quality Assurance Program Plan

    International Nuclear Information System (INIS)

    1995-01-01

    This quality assurance plan identifies the data necessary, and techniques designed to attain the required quality, to meet the specific data quality objectives associated with the DOE Waste Isolation Pilot Plant (WIPP). This report specifies sampling, waste testing, and analytical methods for transuranic wastes

  4. Strategic planning: the first step in the planning process.

    Science.gov (United States)

    Gelinas, Marc A

    2003-01-01

    Strategic planning is a systematic process through which an organization builds commitment among key stakeholders to goals and priorities which are essential to its mission and vision, and responsive to the operating environment. Strategic planning is the first step in a comprehensive planning process that also includes business planning and implementation planning. If all three steps are carried out in sequence, strategic planning can be a very effective means of educating the stakeholders about where the cancer program is and where it is going, gaining support and commitment for the direction that the cancer program will take, and assuring that everyone's expectations can be managed effectively. Unfortunately, some organizations and cancer program leaders misunderstand the process. Too often, strategic planning is used as a stand-alone activity. This article will describe what strategic planning is, how it should smoothly lead into business planning and implementation planning, and how to avoid the pitfalls that sometimes arise during the strategic planning effort.

  5. Quality Customer Service Action Plan

    International Nuclear Information System (INIS)

    2008-12-01

    Since its establishment in 1992 the RPII has been committed to the provision of high quality services to its customers. This report outlines how the RPII will work towards providing a high quality service to our customers and the standards we aim for in the provision of our services

  6. Total Quality Management Master Plan

    Science.gov (United States)

    1989-01-01

    Enhanced competitiveness in the private . public and international sectors - Increased cash flow, influenced by contractor’s contributions to quality I...the project applies novel public- sector compensation concepts gleaned from the best in the private sector . Major employee development opportunities...management must strive to upgrade the quality of worklife which will also contribute to an environment which fosters continuous improvement. Individuals

  7. Hanford Sampling Quality Management Plan (HSQMP)

    International Nuclear Information System (INIS)

    Hyatt, J.E.

    1995-01-01

    This document provides a management tool for evaluating and designing the appropriate elements of a field sampling program. This document provides discussion of the elements of a program and is to be used as a guidance document during the preparation of project and/or function specific documentation. This document does not specify how a sampling program shall be organized. The HSQMP is to be used as a companion document to the Hanford Analytical Services Quality Assurance Plan (HASQAP) DOE/RL-94-55. The generation of this document was enhanced by conducting baseline evaluations of current sampling organizations. Valuable input was received from members of field and Quality Assurance organizations. The HSQMP is expected to be a living document. Revisions will be made as regulations and or Hanford Site conditions warrant changes in the best management practices. Appendices included are: summary of the sampling and analysis work flow process, a user's guide to the Data Quality Objective process, and a self-assessment checklist

  8. Quality assurance program plan for Building 324

    International Nuclear Information System (INIS)

    Tanke, J.M.

    1997-01-01

    This Quality Assurance Program Plan (QAPP) provides an overview of the quality assurance program for Building 324. This plan supersedes the PNNL Nuclear Facilities Quality Management System Description, PNL-NF-QMSD, Revision 2, dated March 1996. The program applies to the facility safety structures, systems, and components and to activities that could affect safety structures, systems, and components. Adherence to the quality assurance program ensures the following: US Department of Energy missions and objectives are effectively accomplished; Products and services are safe, reliable, and meet or exceed the requirements and expectations of the user; Hazards to the public, to Hanford Site and facility workers, and to the environment are minimized. The format of this Quality Assurance Program Plan is structured to parallel that of 10 CFR 83 0.120, Quality Assurance Requirements

  9. 40 CFR 130.6 - Water quality management plans.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 21 2010-07-01 2010-07-01 false Water quality management plans. 130.6... QUALITY PLANNING AND MANAGEMENT § 130.6 Water quality management plans. (a) Water quality management (WQM... and certified and approved updates to those plans. Continuing water quality planning shall be based...

  10. KCBX Quality Assurance Project Plan - October 2014

    Science.gov (United States)

    This revised plan's standards for data quality, sampling and testing methods, and task management guide the implementation of Ambient Air Monitoring by URS Corporation at the KCBX Terminals Company North and South Terminals in Chicago, Ill.

  11. KCBX Quality Assurance Project Plan - February 2014

    Science.gov (United States)

    This plan's standards for data quality, sampling and testing methods, and task management guide the implementation of Ambient Air Monitoring, by URS Corporation, at the KCBX Terminals Company North and South Terminals in Chicago, IL.

  12. Quality Assurance Project Plan Development Tool

    Science.gov (United States)

    This tool contains information designed to assist in developing a Quality Assurance (QA) Project Plan that meets EPA requirements for projects that involve surface or groundwater monitoring and/or the collection and analysis of water samples.

  13. Air quality and future energy system planning

    Science.gov (United States)

    Sobral Mourao, Zenaida; Konadu, Dennis; Lupton, Rick

    2016-04-01

    Ambient air pollution has been linked to an increasing number of premature deaths throughout the world. Projected increases in demand for food, energy resources and manufactured products will likely contribute to exacerbate air pollution with an increasing impact on human health, agricultural productivity and climate change. Current events such as tampering emissions tests by VW car manufacturers, failure to comply with EU Air Quality directives and WHO guidelines by many EU countries, the problem of smog in Chinese cities and new industrial emissions regulations represent unique challenges but also opportunities for regulators, local authorities and industry. However current models and practices of energy and resource use do not consider ambient air impacts as an integral part of the planing process. Furthermore the analysis of drivers, sources and impacts of air pollution is often fragmented, difficult to understand and lacks effective visualization tools that bring all of these components together. This work aims to develop a model that links impacts of air quality on human health and ecosystems to current and future developments in the energy system, industrial and agricultural activity and patterns of land use. The model will be added to the ForeseerTM tool, which is an integrated resource analysis platform that has been developed at the University of Cambridge initially with funding from BP and more recently through the EPSRC funded Whole Systems Energy Modeling (WholeSEM) project. The basis of the tool is a set of linked physical models for energy, water and land, including the technologies that are used to transform these resources into final services such as housing, food, transport and household goods. The new air quality model will explore different feedback effects between energy, land and atmospheric systems with the overarching goal of supporting better communication about the drivers of air quality and to incorporate concerns about air quality into

  14. Air Quality Management Process Cycle

    Science.gov (United States)

    Air quality management are activities a regulatory authority undertakes to protect human health and the environment from the harmful effects of air pollution. The process of managing air quality can be illustrated as a cycle of inter-related elements.

  15. OCRWM's evolving strategic planning process and the 1990 plan

    International Nuclear Information System (INIS)

    Sprecher, W.M.; Munro, J.F.; Champagne, D.L.

    1991-01-01

    In 1990, the Secretary of Energy (Secretary Watkins) ordered that all 23 of the Department's major organizations adopt systems of strategic planning. This paper explains the strategic planning process being adopted by one of those organizations, the Office of Civilian Radioactive Waste Management (OCRWM). Secretary Watkins also ordered a much-abbreviated planning cycle for 1990 to produce the first set of plans in September. That first plan for OCRWM is also discussed here

  16. Air Pollution Monitoring | Air Quality Planning & Standards ...

    Science.gov (United States)

    2016-06-08

    The basic mission of the Office of Air Quality Planning and Standards is to preserve and improve the quality of our nation's air. To accomplish this, OAQPS must be able to evaluate the status of the atmosphere as compared to clean air standards and historical information.

  17. SNF Project Engineering Process Improvement Plan

    International Nuclear Information System (INIS)

    DESAI, S.P.

    2000-01-01

    This plan documents the SNF Project activities and plans to support its engineering process. It describes five SNF Project Engineering initiatives: new engineering procedures, qualification cards process; configuration management, engineering self assessments, and integrated schedule for engineering activities

  18. MO-B-BRB-00: Optimizing the Treatment Planning Process

    International Nuclear Information System (INIS)

    2015-01-01

    The radiotherapy treatment planning process has evolved over the years with innovations in treatment planning, treatment delivery and imaging systems. Treatment modality and simulation technologies are also rapidly improving and affecting the planning process. For example, Image-guided-radiation-therapy has been widely adopted for patient setup, leading to margin reduction and isocenter repositioning after simulation. Stereotactic Body radiation therapy (SBRT) and Radiosurgery (SRS) have gradually become the standard of care for many treatment sites, which demand a higher throughput for the treatment plans even if the number of treatments per day remains the same. Finally, simulation, planning and treatment are traditionally sequential events. However, with emerging adaptive radiotherapy, they are becoming more tightly intertwined, leading to iterative processes. Enhanced efficiency of planning is therefore becoming more critical and poses serious challenge to the treatment planning process; Lean Six Sigma approaches are being utilized increasingly to balance the competing needs for speed and quality. In this symposium we will discuss the treatment planning process and illustrate effective techniques for managing workflow. Topics will include: Planning techniques: (a) beam placement, (b) dose optimization, (c) plan evaluation (d) export to RVS. Planning workflow: (a) import images, (b) Image fusion, (c) contouring, (d) plan approval (e) plan check (f) chart check, (g) sequential and iterative process Influence of upstream and downstream operations: (a) simulation, (b) immobilization, (c) motion management, (d) QA, (e) IGRT, (f) Treatment delivery, (g) SBRT/SRS (h) adaptive planning Reduction of delay between planning steps with Lean systems due to (a) communication, (b) limited resource, (b) contour, (c) plan approval, (d) treatment. Optimizing planning processes: (a) contour validation (b) consistent planning protocol, (c) protocol/template sharing, (d) semi

  19. MO-B-BRB-00: Optimizing the Treatment Planning Process

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2015-06-15

    The radiotherapy treatment planning process has evolved over the years with innovations in treatment planning, treatment delivery and imaging systems. Treatment modality and simulation technologies are also rapidly improving and affecting the planning process. For example, Image-guided-radiation-therapy has been widely adopted for patient setup, leading to margin reduction and isocenter repositioning after simulation. Stereotactic Body radiation therapy (SBRT) and Radiosurgery (SRS) have gradually become the standard of care for many treatment sites, which demand a higher throughput for the treatment plans even if the number of treatments per day remains the same. Finally, simulation, planning and treatment are traditionally sequential events. However, with emerging adaptive radiotherapy, they are becoming more tightly intertwined, leading to iterative processes. Enhanced efficiency of planning is therefore becoming more critical and poses serious challenge to the treatment planning process; Lean Six Sigma approaches are being utilized increasingly to balance the competing needs for speed and quality. In this symposium we will discuss the treatment planning process and illustrate effective techniques for managing workflow. Topics will include: Planning techniques: (a) beam placement, (b) dose optimization, (c) plan evaluation (d) export to RVS. Planning workflow: (a) import images, (b) Image fusion, (c) contouring, (d) plan approval (e) plan check (f) chart check, (g) sequential and iterative process Influence of upstream and downstream operations: (a) simulation, (b) immobilization, (c) motion management, (d) QA, (e) IGRT, (f) Treatment delivery, (g) SBRT/SRS (h) adaptive planning Reduction of delay between planning steps with Lean systems due to (a) communication, (b) limited resource, (b) contour, (c) plan approval, (d) treatment. Optimizing planning processes: (a) contour validation (b) consistent planning protocol, (c) protocol/template sharing, (d) semi

  20. Linking customer satisfaction, quality, and strategic planning

    OpenAIRE

    Reis, Dayr; Peña, Leticia

    2000-01-01

    By acknowledging and dissecting the interconnected roles of customer satisfaction, quality, and strategic planning, this paper provides an analytical framework for creating a customer-driven organization and culture. It shows how quality starts and ends with the customer. Companies that are achieving long-term continuous improvement in quality tailored to customer satisfaction possess lasting characteristics such as customer orientation, customer consciousness, and customer responsiveness. In...

  1. [Mechanized system for planning technological processes].

    Science.gov (United States)

    Pashchenko, V S; Shapiro, A M

    1977-01-01

    A mechanized system for the production processes planning involving the use of an electronic code device for data preparation on a punched tape of the "EPECT-IT" type, at the base of which there are classifiers of standard operations and transitions to individual design members, is considered. A fragment of the classifier and a skeleton diagram of the system are presented. It is pointed out that the use of the system helps improve the quality of the design work, as well as to yield considerable economic advantages. The system is in operation at some enterprises of the medical engineering industry.

  2. Directing a Quality Enhancement Plan

    Directory of Open Access Journals (Sweden)

    Ronald A. Styron, Jr.

    2015-08-01

    Full Text Available This paper is drawn from a project aimed at enhancing the quality of instructional practice and improving studentlearning outcomes in classes across an urban university located in the southern region of the United States. The strategies, employed by the project leader, are discussed in detail as framed by a new problem-solving leadership design called the Alloy Improvement Model (AIM. Data collected at the end of the second full year and reported in this paper indicated all project goals were met and that the utilization of the AIM was central to project success.

  3. Approved Air Quality Implementation Plans in Region 10

    Science.gov (United States)

    Landing page for information about EPA-approved air quality State Implementation Plans (SIPs), Tribal Implementation Plans (TIPs), and Federal Implementation Plans (FIPs) in Alaska, Idaho, Oregon, Washington.

  4. Evidence development and publication planning: strategic process.

    Science.gov (United States)

    Wittek, Michael R; Jo Williams, Mary; Carlson, Angeline M

    2009-11-01

    A number of decisions in the health care field rely heavily on published clinical evidence. A systematic approach to evidence development and publication planning is required to develop a portfolio of evidence that includes at minimum information on efficacy, safety, durability of effect, quality of life, and economic outcomes. The approach requires a critical assessment of available literature, identification of gaps in the literature, and a strategic plan to fill the gaps to ensure the availability of evidence demanded for clinical decisions, coverage/payment decisions and health technology assessments. The purpose of this manuscript is to offer a six-step strategic process leading to a portfolio of evidence that meets the informational needs of providers, payers, and governmental agencies concerning patient access to a therapy.

  5. Research and development quality assurance planning

    Energy Technology Data Exchange (ETDEWEB)

    Hoke, P.B.

    1990-05-14

    Planning for quality assurance (QA) in research and development (R D) is like stealing eggs without waking up the chickens. The QA program should be as unobtrusive as possible. Researchers require a QA program that affords them an environment capable of supporting repeatable experiments with accurate data without unduly stifling their creative abilities. Careful advance planning ensures that the intensity of control provided by quality-related systems is commensurate with the importance and scope of the activities being performed. Good scientific practices applied to small bench-scale projects may require minimal additional controls. As projects increase in size and complexity the controls imposed through planning must, by necessity, be increased. Research and development QA planning, just like any other planning, involves all affected individuals. The application of control systems is determined by factors such as customer or sponsor requirements, the importance of an item or activity to the experiment's success, and the organizational complexity of the project. Many larger experiments are highly dependent on quality-related support activities such as calibration, engineering design, and inspection provided by organizations outside the R D group. Since, in most cases, the expense of support activities is taken directly from funds available for research, it is important for the researchers to be involved in the planning efforts to help determine and agree with the level of QA effort required. A single plan will often suffice for organizations engaged in large numbers of similar experiments. Complex experiments may require unique QA plans or additions to existing plans. Once implemented, the R D QA plans, like any others, require audits or surveillances and may require revisions if the scope of the experiment changes. 1 ref., 1 fig.

  6. Research and development quality assurance planning

    International Nuclear Information System (INIS)

    Hoke, P.B.

    1990-01-01

    Planning for quality assurance (QA) in research and development (R ampersand D) is like stealing eggs without waking up the chickens. The QA program should be as unobtrusive as possible. Researchers require a QA program that affords them an environment capable of supporting repeatable experiments with accurate data without unduly stifling their creative abilities. Careful advance planning ensures that the intensity of control provided by quality-related systems is commensurate with the importance and scope of the activities being performed. Good scientific practices applied to small bench-scale projects may require minimal additional controls. As projects increase in size and complexity the controls imposed through planning must, by necessity, be increased. Research and development QA planning, just like any other planning, involves all affected individuals. The application of control systems is determined by factors such as customer or sponsor requirements, the importance of an item or activity to the experiment's success, and the organizational complexity of the project. Many larger experiments are highly dependent on quality-related support activities such as calibration, engineering design, and inspection provided by organizations outside the R ampersand D group. Since, in most cases, the expense of support activities is taken directly from funds available for research, it is important for the researchers to be involved in the planning efforts to help determine and agree with the level of QA effort required. A single plan will often suffice for organizations engaged in large numbers of similar experiments. Complex experiments may require unique QA plans or additions to existing plans. Once implemented, the R ampersand D QA plans, like any others, require audits or surveillances and may require revisions if the scope of the experiment changes. 1 ref., 1 fig

  7. Quality-assurance plan for water-quality activities in the U.S. Geological Survey Washington Water Science Center

    Science.gov (United States)

    Conn, Kathleen E.; Huffman, Raegan L.; Barton, Cynthia

    2017-05-08

    In accordance with guidelines set forth by the Office of Water Quality in the Water Mission Area of the U.S. Geological Survey, a quality-assurance plan has been created for use by the Washington Water Science Center (WAWSC) in conducting water-quality activities. This qualityassurance plan documents the standards, policies, and procedures used by the WAWSC for activities related to the collection, processing, storage, analysis, and publication of water-quality data. The policies and procedures documented in this quality-assurance plan for water-quality activities complement the quality-assurance plans for surface-water and groundwater activities at the WAWSC.

  8. Software quality testing process analysis

    OpenAIRE

    Mera Paz, Julián

    2016-01-01

    Introduction: This article is the result of reading, review, analysis of books, magazines and articles well known for their scientific and research quality, which have addressed the software quality testing process. The author, based on his work experience in software development companies, teaching and other areas, has compiled and selected information to argue and substantiate the importance of the software quality testing process. Methodology: the existing literature on the software qualit...

  9. Quality assurance in dosimetry and treatment planning

    International Nuclear Information System (INIS)

    Cunningham, J.R.

    1984-01-01

    The considerations of tissue response to radiation absorbed dose suggest a need for an accuracy of +/-5% in its delivery. This is very demanding and its regular achievement requires careful quality control. There are three distinct phases to the delivery of the planned treatment: calibration of the radiation beam in a reference situation, calculation of the dose distribution for a patient relative to the reference dose and the delivery of the radiation to the patient as planned. Each has distinctly different quality assurance requirements and must be diligently observed if the desired accuracy is to be achieved

  10. 45 CFR 98.14 - Plan process.

    Science.gov (United States)

    2010-10-01

    ... 45 Public Welfare 1 2010-10-01 2010-10-01 false Plan process. 98.14 Section 98.14 Public Welfare DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL ADMINISTRATION CHILD CARE AND DEVELOPMENT FUND General Application Procedures § 98.14 Plan process. In the development of each Plan, as required pursuant to § 98.17...

  11. Quality in the fabrication process

    International Nuclear Information System (INIS)

    Romano, A.; Aguirre, F.

    2010-01-01

    Enusa commitment to quality in the manufacture process materializes in the application of the most advanced product quality control technologies such as not-destructive inspection techniques, like artificial vision, X-ray or UT inspection, or process parameter statistical control systems. Quality inspectors are trained and certified by the main National Quality Organizations and receive periodic training under a formal company training program that constantly updates their qualification. Fabrication quality control reliability is based on a strategy that prioritizes redundancy of critical inspection equipment's and inspection personnel knowledge polyvalence. Furthermore, improvement in fabrication quality is obtained by a systematic application of the six sigma methodology where added value is created in projects integrating crosscutting company knowledge, reinforcing the global company vision that the fuel business is based on quality. (Author)

  12. The text plan concept: contributions to the writing planning process

    Directory of Open Access Journals (Sweden)

    Ana Lúcia Tinoco Cabral

    2013-12-01

    Full Text Available Students - at different levels, ranging from early grades up to PhD - face problems both on comprehension and text production. This paper focuses on the text plan concept according to the DTA (Discourse Text Analysis approach, i.e., a principle of organization that allows students to put into practice the production intention as well as to arrange text information while producing; being responsible for the text compositional structure (Adam, 2008. The study analyzes the relation between text plan and the writing planning process, in which the first one provides the second with theoretical support. In order to develop such research, the study covers some issues related to the reading skill, analyzes an argumentative text as per its textual plan, and presents some reflections on the writing process, focusing on the relation between textual plan and the writing planning process.

  13. Quality Management Plan for the Environmental Assessment and Innovation Division

    Science.gov (United States)

    Quality management plan (QMP) which identifies the mission, roles, responsibilities of personnel with regard to quality assurance and quality management for the environmental assessment and innovation division.

  14. MCNP trademark Software Quality Assurance plan

    International Nuclear Information System (INIS)

    Abhold, H.M.; Hendricks, J.S.

    1996-04-01

    MCNP is a computer code that models the interaction of radiation with matter. MCNP is developed and maintained by the Transport Methods Group (XTM) of the Los Alamos National Laboratory (LANL). This plan describes the Software Quality Assurance (SQA) program applied to the code. The SQA program is consistent with the requirements of IEEE-730.1 and the guiding principles of ISO 900

  15. Software quality assurance plan for GCS

    Science.gov (United States)

    Duncan, Stephen E.; Bailey, Elizabeth K.

    1990-01-01

    The software quality assurance (SQA) function for the Guidance and Control Software (GCS) project which is part of a software error studies research program is described. The SQA plan outlines all of the procedures, controls, and audits to be carried out by the SQA organization to ensure adherence to the policies, procedures, and standards for the GCS project.

  16. Standard Review Plan for Environmental Restoration Program Quality Management Plans

    International Nuclear Information System (INIS)

    1993-12-01

    The Department of Energy, Richland Operations Office (RL) Manual Environmental Restoration Program Quality System Requirements (QSR) for the Hanford Site, defines all quality requirements governing Hanford Environmental Restoration (ER) Program activities. The QSR requires that ER Program participants develop Quality Management Plans (QMPs) that describe how the QSR requirements will be implemented for their assigned scopes of work. This standard review plan (SRP) describes the ER program participant responsibilities for submittal of QMPs to the RL Environmental Restoration Division for review and the RL methodology for performing the reviews of participant QMPS. The SRP serves the following functions: acts as a guide in the development or revision of QMPs to assure that the content is complete and adequate; acts as a checklist to be used by the RL staff in their review of participant QMPs; acts as an index or matrix between the requirements of the QSR and implementing methodologies described in the QMPs; decreases the time and subjectivity of document reviews; and provides a formal, documented method for describing exceptions, modifications, or waivers to established ER Program quality requirements

  17. Metals and Alloys Material Stabilization Process Plan

    Energy Technology Data Exchange (ETDEWEB)

    RISENMAY, H.R.; BURK, R.A.

    2000-05-18

    This Plan outlines the process for brushing metal and alloys in accordance with the path forward discussed in the Integrated Project Management Plan for the Plutonium Finishing Plant Stabilization and Deactivation Project, HNF-3617, and requirements set forth in the Project Management Plan for Materials Stabilization, HNF-3605. This plan provides the basis for selection of the location to process, the processes involved, equipment to be used, and the characterization of the contents of the can. The scope of the process is from retrieval of metals and alloys from storage to transfer back to storage in a repackaged configuration.

  18. Metals and Alloys Material Stabilization Process Plan

    International Nuclear Information System (INIS)

    RISENMAY, H.R.; BURK, R.A.

    2000-01-01

    This Plan outlines the process for brushing metal and alloys in accordance with the path forward discussed in the Integrated Project Management Plan for the Plutonium Finishing Plant Stabilization and Deactivation Project, HNF-3617, and requirements set forth in the Project Management Plan for Materials Stabilization, HNF-3605. This plan provides the basis for selection of the location to process, the processes involved, equipment to be used, and the characterization of the contents of the can. The scope of the process is from retrieval of metals and alloys from storage to transfer back to storage in a repackaged configuration

  19. The Columbia River Protection Supplemental Technologies Quality Assurance Project Plan

    Energy Technology Data Exchange (ETDEWEB)

    Fix, N. J.

    2008-03-12

    Pacific Northwest National Laboratory researchers are working on the Columbia River Protection Supplemental Technologies Project. This project is a U. S. Department of Energy, Office of Environmental Management-funded initiative designed to develop new methods, strategies, and technologies for characterizing, modeling, remediating, and monitoring soils and groundwater contaminated with metals, radionuclides, and chlorinated organics. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the Technologies Project staff.

  20. Strategic planning processes and hospital financial performance.

    Science.gov (United States)

    Kaissi, Amer A; Begun, James W

    2008-01-01

    Many common management practices in healthcare organizations, including the practice of strategic planning, have not been subject to widespread assessment through empirical research. If management practice is to be evidence-based, evaluations of such common practices need to be undertaken. The purpose of this research is to provide evidence on the extent of strategic planning practices and the association between hospital strategic planning processes and financial performance. In 2006, we surveyed a sample of 138 chief executive officers (CEOs) of hospitals in the state of Texas about strategic planning in their organizations and collected financial information on the hospitals for 2003. Among the sample hospitals, 87 percent reported having a strategic plan, and most reported that they followed a variety of common practices recommended for strategic planning-having a comprehensive plan, involving physicians, involving the board, and implementing the plan. About one-half of the hospitals assigned responsibility for the plan to the CEO. We tested the association between these planning characteristics in 2006 and two measures of financial performance for 2003. Three dimensions of the strategic planning process--having a strategic plan, assigning the CEO responsibility for the plan, and involving the board--are positively associated with earlier financial performance. Further longitudinal studies are needed to evaluate the cause-and-effect relationship between planning and performance.

  1. D7.1 Quality Plan

    DEFF Research Database (Denmark)

    Ryberg, Thomas; Lee, Deirdre; Maglavera, Stavroula

    2009-01-01

    This deliverable includes a detailed description of the quality assurance process for the EATrain2 project, the initial results of the risk assessment and self-evaluation processes as well as a description of the peer-review process for ensuring qualitative deliverables....

  2. ERD UMTRA Project quality assurance program plan, Revision 7

    International Nuclear Information System (INIS)

    1995-09-01

    This document is the revised Quality Assurance Program Plan (QAPP) dated September, 1995 for the Environmental Restoration Division (ERD) Uranium Mill Tailings Remedial Action Project (UMTRA). Quality Assurance requirements for the ERD UMTRA Project are based on the criteria outlined in DOE Order 5700.6C or applicable sections of 10 CFR 830.120. QA requirements contained in this QAPP shall apply to all personnel, processes, and activities, including planning, scheduling, and cost control, performed by the ERD UMTRA Project and its contractors

  3. 242-A Evaporator quality assurance plan. Revision 2

    International Nuclear Information System (INIS)

    Basra, T.S.

    1995-01-01

    The purpose of this quality assurance project plan (Plan) is to provide requirements for activities pertaining to sampling, shipping, and analyses associated with candidate feed tank samples for the 242-A Evaporator project. The purpose of the 242-A Evaporator project is to reduce the volume of aqueous waste in the Double Shell Tank (DST) System and will result in considerable savings to the disposal of mixed waste. The 242-A Evaporator feed stream originates from DSTs identified as candidate feed tanks. The 242-A Evaporator reduces the volume of aqueous waste contained in DSTs by boiling off water and sending the condensate (called process condensate) to the Liquid Effluent Retention Facility (LEPF) storage basin where it is stored prior to treatment in the Effluent Treatment Facility (ETF). The objective of this quality assurance project plan is to provide the planning, implementation, and assessment of sample collection and analysis, data issuance, and validation activities for the candidate feed tanks

  4. 42 CFR 441.474 - Quality assurance and improvement plan.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 4 2010-10-01 2010-10-01 false Quality assurance and improvement plan. 441.474... improvement plan. (a) The State must provide a quality assurance and improvement plan that describes the State... pursue opportunities for system improvement. (b) The quality assurance and improvement plan shall also...

  5. 45 CFR 1304.60 - Deficiencies and quality improvement plans.

    Science.gov (United States)

    2010-10-01

    ... 45 Public Welfare 4 2010-10-01 2010-10-01 false Deficiencies and quality improvement plans. 1304... must correct the deficiency either immediately or pursuant to a Quality Improvement Plan. (c) An Early... Improvement Plan must submit to the responsible HHS official a Quality Improvement Plan specifying, for each...

  6. Organizational factors, planning capacity, and integration challenges constrain provincial planning processes for nutrition in decentralizing Vietnam.

    Science.gov (United States)

    Lapping, Karin; Frongillo, Edward A; Nguyen, Phuong H; Coates, Jennifer; Webb, Patrick; Menon, Purnima

    2014-09-01

    Translating national policies and guidelines into effective action at the subnational level (e.g., province or region) is a prerequisite for ensuring an impact on nutrition. In several countries, including Vietnam, the focus of this paper, this process is affected by the quality of the decentralized process of planning and action. This study examined how provincial planning processes for nutrition occurred in Vietnam during 2009 and 2010. Key goals were to understand variability in processes across provinces, identify factors that influenced the process, and assess the usefulness of the process for individuals involved in planning and action. A qualitative case-study methodology was used. Data were drawn from interviews with 51 government officials in eight provinces. The study found little variability in the planning process among these eight provinces, probably due to a planning process that was predominantly a fiscal exercise within the confines of a largely centralized structure. Respondents were almost unanimous about the main barriers: a top-down approach to planning, limited human capacity for effective planning at subnational levels, and difficulty in integrating actions from multiple sectors. Provincial-level actors were deeply dissatisfied with the nature of their role in the process. Despite the rhetoric to the contrary, too much power is probably still retained at the central level. A strategic multiyear approach is needed to strengthen the provincial planning process and address many of the key barriers identified in this study.

  7. Strategy in Generative Planning of Turning Processes

    NARCIS (Netherlands)

    van Houten, Frederikus J.A.M.; Kals, H.J.J.

    1986-01-01

    This paper reports on the process and operations planning system ROUND and the strategies which underlie the decision making processes in the planning of turning operations. At first, an outline is given about the environment for which generative systems like ROUND are being developed. The

  8. SNF project engineering process improvement plan

    International Nuclear Information System (INIS)

    DESAI, S.P.

    1999-01-01

    This Engineering Process Improvement Plan documents the activities and plans to be taken by the SNF Project to support its engineering process and to produce a consolidated set of engineering procedures that are fully compliant with the requirements of HNF-PRO-1819. All new procedures will be issued and implemented by September 30, 1999

  9. Software quality assurance plan for viscometer

    International Nuclear Information System (INIS)

    Gimera, M.

    1994-01-01

    The in situ viscometer is a portable instrument designed to raise and lower a sphere (rheometer ball) through layers of tank waste material while recording ball position, velocity, and cable tension. In the field, the viscometer attaches to a decontamination spool piece which in turn is designed to attach to any 4-inch, 150-pound flange (typical of many available tank risers). The motion of the ball and collection of data is controlled by instrumentation and control equipment housed in a separate remote control console. This document covers the product, Viscometer Data Acquisition Software. This document provides the software quality assurance plan, verification and validation plan, and configuration management plan for developing the software for the instrumentation that will be used to obtain rheology data from Tank SY-101

  10. A ten-step process to develop case management plans.

    Science.gov (United States)

    Tahan, Hussein A

    2002-01-01

    The use of case management plans has contained cost and improved quality of care successfully. However, the process of developing these plans remains a great challenge for healthcare executives, in this article, the author presents the answer to this challenge by discussing a 10-step formal process that administrators of patient care services and case managers can adapt to their institutions. It also can be used by interdisciplinary team members as a practical guide to develop a specific case management plan. This process is applicable to any care setting (acute, ambulatory, long term, and home care), diagnosis, or procedure. It is particularly important for those organizations that currently do not have a deliberate and systematic process to develop case management plans and are struggling with how to improve the efficiency and productivity of interdisciplinary teams charged with developing case management plans.

  11. 42 CFR 84.40 - Quality control plans; filing requirements.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false Quality control plans; filing requirements. 84.40... Control § 84.40 Quality control plans; filing requirements. As a part of each application for approval or... proposed quality control plan which shall be designed to assure the quality of respiratory protection...

  12. 30 CFR 28.30 - Quality control plans; filing requirements.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Quality control plans; filing requirements. 28... PROTECTION FOR TRAILING CABLES IN COAL MINES Quality Control § 28.30 Quality control plans; filing... part, each applicant shall file with MSHA a proposed quality control plan which shall be designed to...

  13. Market and plan characteristics related to HMO quality and improvement.

    Science.gov (United States)

    Scanlon, Dennis P; Swaminathan, Shailender; Chernew, Michael; Lee, Woolton

    2006-12-01

    Existing research on health plan performance examines whether variation in plans' scores is related to enrollee and health plan traits, primarily using cross-sectional research designs. This study extends that literature by incorporating data on market characteristics using a longitudinal framework. We estimate multivariate growth models that relate plan performance on standard measures to market and HMO characteristics using an unbalanced panel of data for 1998 to 2002. We find that HMO competition is not associated with better performance or greater rates of improvement in performance on the HEDIS chronic care measures. HMO penetration, on the other hand, is positively associated with HEDIS performance in several of the chronic care process-and-outcomes measures but not with a greater rate of improvement through time. Our analysis indicates that a significant percentage of the unexplained variation in quality improvement is because of permanent, unobserved plan-level characteristics that future research should strive to identify.

  14. Implementation guide for Hanford Analytical Services Quality Assurance Plan

    International Nuclear Information System (INIS)

    1994-09-01

    This implementation guide for the Hanford Analytical Services Quality Assurance Plan (HASQAP) was developed by the US Department of Energy, Richland Operations Office (RL) Waste Management Division, Analytical Services Branch. This plan formally presents RL's direction for Hanford Sitewide implementation of the HASQAP. The HASQAP establishes a uniform standard for quality requirements to meet US Department of Energy Order 5700.6C, Quality Assurance (10 CFR 830.120, ''Quality Assurance Requirements''), and is intended to satisfy the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) requirements for ''Guidance on Preparation of Laboratory Quality Assurance Plans''. The quality assurance criteria specified in the HASQAP shall serve as a baseline for implementing quality management systems for the laboratories that provide analytical services, for data requesters and users, and for oversight organizations that monitor the data-generation process. Affected organizations shall implement the HASQAP requirements that are applicable to their work scope. Full implementation of the HASQAP is scheduled to occur by August 1995. RL will work with the US Environmental Protection Agency (EPA) and Washington State Department of Ecology (Ecology) to have the HASQAP document incorporated into Appendix F of the Tri-Party Agreement by early Fiscal Year 1996

  15. Project Hanford management contract quality improvement project management plan; TOPICAL

    International Nuclear Information System (INIS)

    ADAMS, D.E.

    1999-01-01

    On July 13, 1998, the U.S. Department of Energy, Richland Operations Office (DOE-RL) Manager transmitted a letter to Fluor Daniel Hanford, Inc. (FDH) describing several DOE-RL identified failed opportunities for FDH to improve the Quality Assurance (QA) Program and its implementation. In addition, DOE-RL identified specific Quality Program performance deficiencies. FDH was requested to establish a periodic reporting mechanism for the corrective action program. In a July 17, 1998 response to DOE-RL, FDH agreed with the DOE concerns and committed to perform a comprehensive review of the Project Hanford Management Contract (PHMC) QA Program during July and August, 1998. As a result, the Project Hanford Management Contract Quality Improvement Plan (QIP) (FDH-3508) was issued on October 21, 1998. The plan identified corrective actions based upon the results of an in-depth Quality Program Assessment. Immediately following the scheduled October 22, 1998, DOE Office of Enforcement and Investigation (EH-10) Enforcement Conference, FDH initiated efforts to effectively implement the QIP corrective actions. A Quality Improvement Project (QI Project) leadership team was assembled to prepare a Project Management Plan for this project. The management plan was specifically designed to engage a core team and the support of representatives from FDH and the major subcontractors (MSCs) to implement the QIP initiatives; identify, correct, and provide feedback as to the root cause for deficiency; and close out the corrective actions. The QI Project will manage and communicate progress of the process

  16. Implementation of imaging of the national protocol for quality control in planning systems

    International Nuclear Information System (INIS)

    Caudepon Moreno, F.; Martin-Viera cueto, J. A.; Bodineau gil, C.; Benitez Villegas, E. M.; Casado Villalon, F. J.; Moreno Sainz, C.

    2011-01-01

    Quality control of the planning system (SP) plays a key role in quality assurance schemes that include all stages of the radiotherapy process.In this work we focus on the evidence detailing the ''Protocol for quality control in therapy planning systems with ionizing radiation of the SEFM in ''anatomical data acquisition (DA).

  17. Quality Control in Production Processes

    Directory of Open Access Journals (Sweden)

    Prístavka Miroslav

    2016-09-01

    Full Text Available The tools for quality management are used for quality improvement throughout the whole Europe and developed countries. Simple statistics are considered one of the most basic methods. The goal was to apply the simple statistical methods to practice and to solve problems by using them. Selected methods are used for processing the list of internal discrepancies within the organization, and for identification of the root cause of the problem and its appropriate solution. Seven basic quality tools are simple graphical tools, but very effective in solving problems related to quality. They are called essential because they are suitable for people with at least basic knowledge in statistics; therefore, they can be used to solve the vast majority of problems.

  18. A Study on the Software Quality Assurance Plan

    International Nuclear Information System (INIS)

    Kim, Hyun Tae

    2006-01-01

    On 25 August 2006, the CMMI V1.2 (Capability Maturity Model Integration Version 1.2) was released with the new title CMMI-DEV (CMMI for Development) which supersedes the CMMI-SE/SW (CMMI for systems engineering and software engineering) V1.1. This study discusses the application of IEEE Std 730-2002, IEEE Standard for Software Quality Assurance Plans, for the implementation of the Process and Product Quality Assurance (PPQA) process area (PA) of the CMMI-DEV

  19. Quality assurance for IAEA inspection planning

    International Nuclear Information System (INIS)

    Markin, J.T.

    1986-01-01

    Under the provisions of the Treaty on Nonproliferation of Nuclear Weapons and other agreements with states, the International Atomic Energy Agency (IAEA) conducts inspections at nuclear facilities to confirm that their operation is consistent with the peaceful use of nuclear material. The Department of Safeguards at the IAEA is considering a quality assurance program for activities related to the planning of these facility inspections. In this report, we summarize recent work in writing standards for planning inspections at the types of facilities inspected by the IAEA. The standards specify the sequence of steps in planning inspections, which are: (1) administrative functions, such as arrangements for visas and travel, and communications with the state to confirm facility operating schedules and the state's acceptance of the assigned inspectors; (2) technical functions including a specification of the required inspection activities, determination of personnel and equipment resources, and a schedule for implementing the inspection activities at the facility; and (3) management functions, such as pre- and post-inspection briefings, where the planned and implemented inspection activities are reviewed

  20. Quality of life after planned neck dissection

    International Nuclear Information System (INIS)

    Iwae, Shigemichi; Hirayama, Yuji; Komatsu, Hirokazu

    2009-01-01

    We evaluated the effect of planned neck dissection (PND) after concurrent chemoradiotherapy (CCRT) on quality of life (QOL) by using a self-administered neck dissection questionnaire and an arm abduction test. Subjects are fourteen patients who had undergone CCRT followed by planned selective neck dissection for the treatment of mesopharyngeal and hypopharyngeal cancer. The findings of the survey were compared with thirty-two patients who had undergone CCRT alone. Patients without PND had better scores on measures of pain, constriction, numbness and appearance of the neck, but had no advantage about arm abduction. After PND, the patients who had dissected dominant hand side had lower satisfaction compared with those who had dissected non-dominant hand side. (author)

  1. 40 CFR 35.2102 - Water quality management planning.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Water quality management planning. 35... Administrator shall first determine that the project is: (a) Included in any water quality management plan being implemented for the area under section 208 of the Act or will be included in any water quality management plan...

  2. 7 CFR 634.23 - Water quality plan.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 6 2010-01-01 2010-01-01 false Water quality plan. 634.23 Section 634.23 Agriculture... AGRICULTURE LONG TERM CONTRACTING RURAL CLEAN WATER PROGRAM Participant RCWP Contracts § 634.23 Water quality plan. (a) The participant's water quality plan, developed with technical assistance by the NRCS or its...

  3. Surfscholar business plan: quality reigns supreme

    OpenAIRE

    Einstein, Samuel

    2016-01-01

    The following master’s thesis entails a business plan for a free service-based company aimed at helping American students to enroll in fulltime master’s programs in Lisbon, Portugal for a fraction of the price of what they would be paying at home. Combining a high-quality and internationally accredited education with world-class surf, exploration and cultural enrichment is the mission. The company, SurfScholar, will function on a per student commission basis which will allow it...

  4. Software quality: Process or people

    Science.gov (United States)

    Palmer, Regina; Labaugh, Modenna

    1993-01-01

    This paper will present data related to software development processes and personnel involvement from the perspective of software quality assurance. We examine eight years of data collected from six projects. Data collected varied by project but usually included defect and fault density with limited use of code metrics, schedule adherence, and budget growth information. The data are a blend of AFSCP 800-14 and suggested productivity measures in Software Metrics: A Practioner's Guide to Improved Product Development. A software quality assurance database tool, SQUID, was used to store and tabulate the data.

  5. UMTRA Project Office quality assurance program plan. Revision 6

    International Nuclear Information System (INIS)

    1994-09-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project was established to accomplish remedial actions at inactive uranium mill tailings sites. The UMTRA Project's mission is to stabilize and control the residual radioactive materials at designated sites in a safe and environmentally sound manner so as to minimize or eliminate radiation health hazards to the public. Because these efforts may involve possible risks to public health and safety, a quality assurance (QA) program that conforms to the applicable criteria has been established to control the quality of the work. This document, the Quality Assurance Program Plan (QAPP), brings into one document the essential criteria to be applied on a selective basis, depending upon the nature of the activity being conducted, and describes how those criteria shall be applied to the UMTRA Project. QA requirements contained in this QAPP shall apply to all personnel, processes, and activities, including planning, scheduling, and cost control, performed by the UMTRA Project Office and its contractors

  6. Are pedestrians invisible in the planning process?

    DEFF Research Database (Denmark)

    Gemzøe, Lars

    2001-01-01

    The vehicular traffic is very visible in the planning process. One of the reasons is that there is always plenty of data on the problems of car traffic - but what about data on the pedestrians and their needs? Three major studies on people in public spaces in the Inner City of Copenhagen have...... supplied data that show the quantity, character and changes through 30 years of public life. People in Copenhagen have become visible in the planning process. cd-rom....

  7. The planning of training process in triathlon

    Directory of Open Access Journals (Sweden)

    Volodymyr Vodlozerov

    2016-04-01

    Full Text Available Purpose: is the working out of base variant of training process as the base for planning of individual training of triathlete. Material & Methods: studying and generalization of special literature of basis training process for endurance in cyclic kinds of sports, the analysis of training of famous triathletes to competitions. Results: mane stages of training process formation in triathlon and features of distribution of sportsman’s training load in depending on period of training were considered. Conclusions: comprehensive planning of training process in different kinds of triathlon is lying down in basis of improving of competition form of triathlete.

  8. Quality plan and configuration management in complex systems

    International Nuclear Information System (INIS)

    Gonzalez Junto, J.; Merchan Teyssiere

    1993-01-01

    Since the Second World War, the philosophy behind the quality systems of industries and service companies has evolved to embrace the whole life cycle of the product, system or service. In this evolution process, quality has become a strategic factor in the survival of entreprises. The first steps in trying to establish quality systems were taken for the armed forces, followed by space, aeronautical and nuclear projects, whose products were more and more complex and sophisticated. These systems were established by means of quality plans or programmes, and their basic objective was to guarantee a high safety level for the user and/or the general population. In later years, the main concern was to reach a determined quality level not only in one phase of the product life, but in the complete life cycle of the final product. Today a new goal is established and pursued: better quality of the product, service or system life cycle at a lower cost. Methods of improving the quality of systems and processes are the subject of numerous initiatives and studies, to better availability and maintainability of complex equipment or installations, with an extended useful life and greater requirements. Experience in the performance of complex projects shows that a higher quality may be obtained through designing a comprehensive quality plan which pays special attention to information management and modifications of the original design. Obtaining a high reliability level for an installation (equipment, systems, etc), increasing its availability and rationalizing its maintenance may be little less than fanciful without a deep knowledge of the installation, of its activities and its current status in day-to-day operation, which shows the importance of truthful information available to operators and corresponding exactly to their needs. In this frame of mind, a quality plan comprising a configuration management system of information and documents constitutes the basic support tool for

  9. Transportation Planning and Quality of Life: Where Do They Intersect?

    Science.gov (United States)

    Lee, Richard J.

    2016-01-01

    Policy makers and researchers are increasingly recognizing the connections between public health and transportation, but health improvements are typically framed from a physical health perspective rather than considering broader quality of life (QOL) impacts. Currently, there is a limited understanding of the ways in which transportation and QOL intersect, and little is known about how metropolitan planning organizations (MPOs) in the United States are addressing QOL outcomes. This study addressed these gaps by developing a conceptual framework holistically linking transportation to QOL. The proposed framework identified four transportation-related QOL dimensions—physical, mental, social, and economic well-being—which are predominantly influenced by three components of the transportation system: mobility/accessibility, the built environment, and vehicle traffic. This framework then formed the basis for a content analysis of 148 long-range transportation plans in the United States to evaluate the extent to which QOL is being considered in the planning process. The results of the analysis and a follow-up examination of 13 plans revealed that MPOs are inconsistently addressing QOL. Plans primarily targeted QOL enhancement from the perspective of physical well-being, while mental and social well-being were rarely considered. Policy recommendations were provided to more comprehensively integrate QOL into the transportation planning process. PMID:27546998

  10. QUALITY FUNCTION DEPLOYMENT AS A STRATEGIC PLANNING TOOL

    OpenAIRE

    DEVRİM İÇTENBAŞ, Burcu; ERYILMAZ, Hande

    2011-01-01

    Quality Function Deployment (QFD) uses a house of quality to translate customer requirements into engineering specifications. QFD has been widely used as a tool to develop new products. It has been adopted in the fields of education quality, service quality, software development and marketing planning. The tool has recently been applied in strategic planning .In this study authors reviewed current research which uses QFD as a strategic planning tool and described how QFD methods can be ...

  11. Astronomical Instrumentation Systems Quality Management Planning: AISQMP (Abstract)

    Science.gov (United States)

    Goldbaum, J.

    2017-12-01

    (Abstract only) The capability of small aperture astronomical instrumentation systems (AIS) to make meaningful scientific contributions has never been better. The purpose of AIS quality management planning (AISQMP) is to ensure the quality of these contributions such that they are both valid and reliable. The first step involved with AISQMP is to specify objective quality measures not just for the AIS final product, but also for the instrumentation used in its production. The next step is to set up a process to track these measures and control for any unwanted variation. The final step is continual effort applied to reducing variation and obtaining measured values near optimal theoretical performance. This paper provides an overview of AISQMP while focusing on objective quality measures applied to astronomical imaging systems.

  12. 242-A evaporator quality assurance project plan: Revision 1

    International Nuclear Information System (INIS)

    Tucker, B.J.

    1994-01-01

    The scope of this quality assurance project plan (Plan) is sampling and analytical services including, but not limited to, sample receipt, handling and storage, analytical measurements, submittal of data deliverables, archiving selected portions of samples, returning unneeded sample material to Westinghouse Hanford Company (WHC), and/or sample disposal associated with candidate feed samples and process condensate compliance samples. Sampling and shipping activities are also included within the scope. The purpose of this project is to provide planning, implementation, and assessment guidance for achieving established data quality objectives measurement parameters. This Plan requires onsite and offsite laboratories to conform to that guidance. Laboratory conformance will help ensure that quality data are being generated and therefore, that the 242-A evaporator is operating in a safe and compliant manner. The 242-A evaporator feed stream originates from double-shell tanks (DSTs) identified as candidate feed tanks. The 242-A evaporator reduces the volume of aqueous waste contained in DSTs by boiling off water and sending it to the Liquid Effluent Retention Facility (LERF) storage basin before further treatment. The slurry product is returned to DSTs. Evaporation results in considerable savings by reducing the volume of mixed waste for disposal

  13. Strategic planning and the budgeting process

    International Nuclear Information System (INIS)

    Craig, J.F.; Probasco, D.R.

    1993-01-01

    As the utility industry continues its transformation to a more competitive environment, companies are coming under ever-increasing pressure to avoid or minimize rate increases, implement new customer and environmental programs, and maintain profitability for shareholders. Two keys to having an effective organization in such an environment are the use of strategic planning and budgetary controls. The authors recently developed and implemented a strategic planning and budgeting process for a client in the Southwest. This paper reviews the highlights of that effort

  14. SAPHIRE 8 Software Quality Assurance Plan

    Energy Technology Data Exchange (ETDEWEB)

    Curtis Smith

    2010-02-01

    This Quality Assurance (QA) Plan documents the QA activities that will be managed by the INL related to JCN N6423. The NRC developed the SAPHIRE computer code for performing probabilistic risk assessments (PRAs) using a personal computer (PC) at the Idaho National Laboratory (INL) under Job Code Number (JCN) L1429. SAPHIRE started out as a feasibility study for a PRA code to be run on a desktop personal PC and evolved through several phases into a state-of-the-art PRA code. The developmental activity of SAPHIRE was the result of two concurrent important events: The tremendous expansion of PC software and hardware capability of the 90s and the onset of a risk-informed regulation era.

  15. Quality of Family Planning Services in Primary Health Centers of ...

    African Journals Online (AJOL)

    Background: Good quality of care in family planning (FP) services help individuals and couples to meet their reproductive health needs safely and effectively. Therefore, assessment and improvement of the quality of family planning services could enhance family planning services utilization. This study was thus conducted ...

  16. Quality assurance in radiation processing

    International Nuclear Information System (INIS)

    Noriah Mod Ali

    2002-01-01

    The growth of the radiation processing industries in Malaysia has presented the SSDL-MINT a new set of parameter for the Quality Assurance (QA) programs. The large massive doses of radiation required for commercial application of sterilization, cross-linking etc needs measurement method outside the scope of familiar radiation detection instruments. This requires establishment of proper calibration procedure and selection of appropriate transfer system/technique to assure adequate traceability to an international radiation standard. The benefit of accurate in-plant dosimetry for the operator, approving authority and purchaser are balanced against the extra dosimetric efforts required for good QA is presented. (Author)

  17. Quality assurance program plan for cesium legacy project

    International Nuclear Information System (INIS)

    Tanke, J.M.

    1997-01-01

    This Quality Assurance Program Plan (QAPP) provides information on how the Quality Assurance Program is implemented for the Cesium Legacy Project. It applies to those items and tasks which affect the completion of activities identified in the work breakdown structure of the Project Management Plan (PMP). These activities include all aspects of cask transportation, project related operations within the 324 Building, and waste management as it relates to the specific activities of this project. General facility activities (i.e. 324 Building Operations, Central Waste Complex Operations, etc.) are covered in other appropriate QAPPs. The 324 Building is currently transitioning from being a Pacific Northwest National Laboratory (PNNL) managed facility to a B and W Hanford Company (BWHC) managed facility. During this transition process existing PNNL procedures and documents will be utilized until replaced by BWHC procedures and documents

  18. Standard review plan for the review of environmental restoration remedial action quality assurance program plans

    International Nuclear Information System (INIS)

    1991-09-01

    This plan establishes both the scope of the review and the acceptance criteria to be utilized for the review of Quality Assurance Program Plans (QAPPs) developed in accordance with the requirements of DOE/RL-90-28. DOE/RL-90-28, the Environmental Restoration Remedial Action Quality Assurance Requirements Document (QARD) defines all quality assurance (QA) requirements governing activities that affect the quality of the Environmental Restoration Remedial Action (ERRA) program at the Hanford Site. These requirements are defined in three parts, Part 1 of Quality Management and Administration tasks, Part 2 for Environmental Data Operations, and Part 3 of the Design and Construction of items, systems, and facilities. The purpose of this document is to identify the scope of the review by the DOE Field Office, Richland staff, and establish the acceptance criteria (Parts 1, 2, and 3) that the DOE Field Office, Richland staff will utilize to evaluate the participant QAPPs. Use of the standard review plan will (1) help ensure that participant QAPPs contain the information required by DOE/RL-90-28, (2) aid program participant and DOE Field Office, Richland staff is ensuring that the information describing the participant's QAPP is complete, (3) help persons regarding DOE/RL- 90-28 to locate information, and (4) contribute to decreasing the time needed for the review process. In addition, the Standard Review Plan (SRP) ensures the quality and uniformity of the staff reviews and presents a well-defined base from which to evaluate compliance of participant quality programs against DOE/RL-90-28

  19. Improving IMRT-plan quality with MLC leaf position refinement post plan optimization

    International Nuclear Information System (INIS)

    Niu Ying; Zhang Guowei; Berman, Barry L.; Parke, William C.; Yi Byongyong; Yu, Cedric X.

    2012-01-01

    Purpose: In intensity-modulated radiation therapy (IMRT) planning, reducing the pencil-beam size may lead to a significant improvement in dose conformity, but also increase the time needed for the dose calculation and plan optimization. The authors develop and evaluate a postoptimization refinement (POpR) method, which makes fine adjustments to the multileaf collimator (MLC) leaf positions after plan optimization, enhancing the spatial precision and improving the plan quality without a significant impact on the computational burden. Methods: The authors’ POpR method is implemented using a commercial treatment planning system based on direct aperture optimization. After an IMRT plan is optimized using pencil beams with regular pencil-beam step size, a greedy search is conducted by looping through all of the involved MLC leaves to see if moving the MLC leaf in or out by half of a pencil-beam step size will improve the objective function value. The half-sized pencil beams, which are used for updating dose distribution in the greedy search, are derived from the existing full-sized pencil beams without need for further pencil-beam dose calculations. A benchmark phantom case and a head-and-neck (HN) case are studied for testing the authors’ POpR method. Results: Using a benchmark phantom and a HN case, the authors have verified that their POpR method can be an efficient technique in the IMRT planning process. Effectiveness of POpR is confirmed by noting significant improvements in objective function values. Dosimetric benefits of POpR are comparable to those of using a finer pencil-beam size from the optimization start, but with far less computation and time. Conclusions: The POpR is a feasible and practical method to significantly improve IMRT-plan quality without compromising the planning efficiency.

  20. SNF project engineering process improvement plan

    International Nuclear Information System (INIS)

    KELMENSON, R.L.

    1999-01-01

    This Engineering Process Improvement Plan documents the activities and plans to be taken by the SNF Project (the Project) to support its engineering process and to produce a consolidated set of engineering procedures that are fully compliant with the requirements of HNF-PRO-1819 (1819). These requirements are imposed on all engineering activities performed for the Project and apply to all life-cycle stages of the Project's systems, structures and components (SSCs). This Plan describes the steps that will be taken by the Project during the transition period to ensure that new procedures are effectively integrated into the Project's work process as these procedures are issued. The consolidated procedures will be issued and implemented by September 30, 1999

  1. 78 FR 53270 - Revision of Air Quality Implementation Plan; California; Sacramento Metropolitan Air Quality...

    Science.gov (United States)

    2013-08-29

    ... Quality Implementation Plan; California; Sacramento Metropolitan Air Quality Management District... to the Sacramento Metropolitan Air Quality Management District (SMAQMD or District) portion of the..., Sacramento Metropolitan Air Quality Management District, Rule 214 (Federal New Source Review), Rule 203...

  2. Integration of Environmental Planning Into the Army Master Planning Process

    Science.gov (United States)

    1992-10-01

    the issues specific to the later assessment (ETL 1110-3-407, pp 1-9 to 1-10). Under the : estructured master planning process discussed in this report...Lisa~m 0111utHars M143 AMW PRO*b LAMM~e 0)3. AMW uaides, Uso ~ow (M Port RJ." 21719 7%s pubhicaton was repfodaaced on moycled V&Mp. /| / 121 DATEI:

  3. Evaluation of participatory planning: Lessons from Hungarian Natura 2000 management planning processes.

    Science.gov (United States)

    Kovács, Eszter; Kelemen, Eszter; Kiss, Gabriella; Kalóczkai, Ágnes; Fabók, Veronika; Mihók, Barbara; Megyesi, Boldizsár; Pataki, György; Bodorkós, Barbara; Balázs, Bálint; Bela, Györgyi; Margóczi, Katalin; Roboz, Ágnes; Molnár, Dániel

    2017-12-15

    Stakeholder participation in nature conservation policies and especially in the management of protected areas has gained importance in the last decades. These changes are underlined by democratic principles and the perceived contribution of stakeholder involvement to the effectiveness of conservation management. Evaluating participatory processes is essential to learn about the past and thus increase the quality of future processes. The evaluation can be useful for the organisations responsible for planning and management, stakeholders and policy makers as well. The present paper shows the results of a systematic evaluation of 25 participatory processes related to the development of management plans for Natura 2000 sites in Hungary between 2007 and 2015. A conceptual framework was developed to evaluate the process and outcome of participatory management planning processes. Criteria were based on the scientific literature on public participation and tailored to conservation-related management planning and stakeholder involvement. Evaluated processes were grouped in three cases based on their time range and financial sources. Overall, the analysed processes scored at a medium level, showing better performance in the process criteria than in the outcome criteria. The best case scored significantly higher in four criteria compared to the other cases: representativeness, resource availability for facilitation, new, creative ideas and impact on the plan. The main factors behind the success were (1) embeddedness of the planning process in a larger project, where the plan was a tool for conservation, (2) carrying out only one process at a time, (3) previous experience of facilitators and planners with participatory planning and (4) the opportunity and capacity to propose a payment scheme as an incentive. But even this case received low scores in some criteria: conflict resolution, early involvement and well defined goals. Based on the results we suggest that more data is

  4. Quality Assurance Program Plan for SFR Metallic Fuel Data Qualification

    Energy Technology Data Exchange (ETDEWEB)

    Benoit, Timothy [Argonne National Lab. (ANL), Argonne, IL (United States). Nuclear Engineering Division; Hlotke, John Daniel [Argonne National Lab. (ANL), Argonne, IL (United States). Nuclear Engineering Division; Yacout, Abdellatif [Argonne National Lab. (ANL), Argonne, IL (United States). Nuclear Engineering Division

    2017-07-05

    This document contains an evaluation of the applicability of the current Quality Assurance Standards from the American Society of Mechanical Engineers Standard NQA-1 (NQA-1) criteria and identifies and describes the quality assurance process(es) by which attributes of historical, analytical, and other data associated with sodium-cooled fast reactor [SFR] metallic fuel and/or related reactor fuel designs and constituency will be evaluated. This process is being instituted to facilitate validation of data to the extent that such data may be used to support future licensing efforts associated with advanced reactor designs. The initial data to be evaluated under this program were generated during the US Integral Fast Reactor program between 1984-1994, where the data includes, but is not limited to, research and development data and associated documents, test plans and associated protocols, operations and test data, technical reports, and information associated with past United States Nuclear Regulatory Commission reviews of SFR designs.

  5. Quality assurance program plan for radionuclide airborne emissions monitoring

    International Nuclear Information System (INIS)

    Boom, R.J.

    1995-12-01

    This Quality Assurance Program Plan identifies quality assurance program requirements and addresses the various Westinghouse Hanford Company organizations and their particular responsibilities in regards to sample and data handling of radiological airborne emissions. This Quality Assurance Program Plan is prepared in accordance with and to written requirements

  6. 40 CFR 35.2023 - Water quality management planning.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Water quality management planning. 35... to the States to carry out water quality management planning including but not limited to: (1... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2023 Water quality...

  7. Air quality management: challenges and solutions in delivering air quality action plans

    Energy Technology Data Exchange (ETDEWEB)

    Beattie, C.I.; Longhurst, J.W.S.; Woodfield, N.K.

    2000-07-01

    The Air Quality Strategy for England, Scotland, Wales and Northern Ireland (DETR, 2001) has the aim of showing how improved local air quality in the UK may be delivered. Through a process of reviewing and assessing local air quality in both urban and rural localities, a clear picture is emerging of areas of the UK where air quality objectives are not likely to be met. The next challenge will be the identification of the required actions and new ways of working to achieve specific air quality objectives. The declaration of air quality management areas, where objectives are not predicted to be met by their target years, involves co-ordinated local action and collaborative working, which can only be effective with support across local authority departments and external stake holders. This paper provides a background to the relevant legislation underpinning, local air quality management and summarises the review and assessment process. It then comments on future directions in relation to the designation of Air Quality Management Areas and considers the requirements of action plans to deliver the goal of cleaner air in the UK. It is concluded that the UK has developed a highly sophisticated system of air quality management over a relatively short period of time, and with it has brought a new way of local authority working. The challenge of the next stage of the process is likely to be in implementing cost effective and proportional solutions to identified problems at the local level. (Author)

  8. Measuring health care process quality with software quality measures.

    Science.gov (United States)

    Yildiz, Ozkan; Demirörs, Onur

    2012-01-01

    Existing quality models focus on some specific diseases, clinics or clinical areas. Although they contain structure, process, or output type measures, there is no model which measures quality of health care processes comprehensively. In addition, due to the not measured overall process quality, hospitals cannot compare quality of processes internally and externally. To bring a solution to above problems, a new model is developed from software quality measures. We have adopted the ISO/IEC 9126 software quality standard for health care processes. Then, JCIAS (Joint Commission International Accreditation Standards for Hospitals) measurable elements were added to model scope for unifying functional requirements. Assessment (diagnosing) process measurement results are provided in this paper. After the application, it was concluded that the model determines weak and strong aspects of the processes, gives a more detailed picture for the process quality, and provides quantifiable information to hospitals to compare their processes with multiple organizations.

  9. Software quality assurance plans for safety-critical software

    International Nuclear Information System (INIS)

    Liddle, P.

    2006-01-01

    Application software is defined as safety-critical if a fault in the software could prevent the system components from performing their nuclear-safety functions. Therefore, for nuclear-safety systems, the AREVA TELEPERM R XS (TXS) system is classified 1E, as defined in the Inst. of Electrical and Electronics Engineers (IEEE) Std 603-1998. The application software is classified as Software Integrity Level (SIL)-4, as defined in IEEE Std 7-4.3.2-2003. The AREVA NP Inc. Software Program Manual (SPM) describes the measures taken to ensure that the TELEPERM XS application software attains a level of quality commensurate with its importance to safety. The manual also describes how TELEPERM XS correctly performs the required safety functions and conforms to established technical and documentation requirements, conventions, rules, and standards. The program manual covers the requirements definition, detailed design, integration, and test phases for the TELEPERM XS application software, and supporting software created by AREVA NP Inc. The SPM is required for all safety-related TELEPERM XS system applications. The program comprises several basic plans and practices: 1. A Software Quality-Assurance Plan (SQAP) that describes the processes necessary to ensure that the software attains a level of quality commensurate with its importance to safety function. 2. A Software Safety Plan (SSP) that identifies the process to reasonably ensure that safety-critical software performs as intended during all abnormal conditions and events, and does not introduce any new hazards that could jeopardize the health and safety of the public. 3. A Software Verification and Validation (V and V) Plan that describes the method of ensuring the software is in accordance with the requirements. 4. A Software Configuration Management Plan (SCMP) that describes the method of maintaining the software in an identifiable state at all times. 5. A Software Operations and Maintenance Plan (SO and MP) that

  10. Leading quality through the development of a multi-year corporate quality plan: sharing The Ottawa Hospital experience.

    Science.gov (United States)

    Hunter, Linda; Myles, Joanne; Worthington, James R; Lebrun, Monique

    2011-01-01

    This article discusses the background and process for developing a multi-year corporate quality plan. The Ottawa Hospital's goal is to be a top 10% performer in quality and patient safety in North America. In order to create long-term measurable and sustainable changes in the quality of patient care, The Ottawa Hospital embarked on the development of a three-year strategic corporate quality plan. This was accomplished by engaging the organization at all levels and defining quality frameworks, aligning with internal and external expectations, prioritizing strategic goals, articulating performance measurements and reporting to stakeholders while maintaining a transparent communication process. The plan was developed through an iterative process that engaged a broad base of health professionals, physicians, support staff, administration and senior management. A literature review of quality frameworks was undertaken, a Quality Plan Working Group was established, 25 key stakeholder interviews were conducted and 48 clinical and support staff consultations were held. The intent was to gather information on current quality initiatives and challenges encountered and to prioritize corporate goals and then create the quality plan. Goals were created and then prioritized through an affinity exercise. Action plans were developed for each goal and included objectives, tasks and activities, performance measures (structure, process and outcome), accountabilities and timelines. This collaborative methodology resulted in the development of a three-year quality plan. Six corporate goals were outlined by the tenets of the quality framework for The Ottawa Hospital: access to care, appropriate care (effective and efficient), safe care and satisfaction with care. Each of the six corporate goals identified objectives and supporting action plans with accountabilities outlining what would be accomplished in years one, two and three. The three-year quality plan was approved by senior

  11. Automation and Intensity Modulated Radiation Therapy for Individualized High-Quality Tangent Breast Treatment Plans

    International Nuclear Information System (INIS)

    Purdie, Thomas G.; Dinniwell, Robert E.; Fyles, Anthony; Sharpe, Michael B.

    2014-01-01

    Purpose: To demonstrate the large-scale clinical implementation and performance of an automated treatment planning methodology for tangential breast intensity modulated radiation therapy (IMRT). Methods and Materials: Automated planning was used to prospectively plan tangential breast IMRT treatment for 1661 patients between June 2009 and November 2012. The automated planning method emulates the manual steps performed by the user during treatment planning, including anatomical segmentation, beam placement, optimization, dose calculation, and plan documentation. The user specifies clinical requirements of the plan to be generated through a user interface embedded in the planning system. The automated method uses heuristic algorithms to define and simplify the technical aspects of the treatment planning process. Results: Automated planning was used in 1661 of 1708 patients receiving tangential breast IMRT during the time interval studied. Therefore, automated planning was applicable in greater than 97% of cases. The time for treatment planning using the automated process is routinely 5 to 6 minutes on standard commercially available planning hardware. We have shown a consistent reduction in plan rejections from plan reviews through the standard quality control process or weekly quality review multidisciplinary breast rounds as we have automated the planning process for tangential breast IMRT. Clinical plan acceptance increased from 97.3% using our previous semiautomated inverse method to 98.9% using the fully automated method. Conclusions: Automation has become the routine standard method for treatment planning of tangential breast IMRT at our institution and is clinically feasible on a large scale. The method has wide clinical applicability and can add tremendous efficiency, standardization, and quality to the current treatment planning process. The use of automated methods can allow centers to more rapidly adopt IMRT and enhance access to the documented

  12. 300 Area Process Trenches Closure Plan

    International Nuclear Information System (INIS)

    Luke, S.N.

    1994-01-01

    Since 1987, Westinghouse Hanford Company has been a major contractor to the US Department of Energy, Richland Operations Office and has served as co-operator of the 300 Area Process Trenches, the waste management unit addressed in this closure plan. For the purposes of the Resource Conservation and Recovery Act, Westinghouse Hanford Company is identified as ''co-operator.'' The 300 Area Process Trenches Closure Plan (Revision 0) consists of a Resource Conservation and Recovery Act Part A Dangerous Waste Permit Application, Form 3 and a Resource Conservation and Recovery Act Closure Plan. An explanation of the Part A Permit Application, Form 3 submitted with this document is provided at the beginning of the Part A Section. The closure plan consists of nine chapters and six appendices. The 300 Area Process Trenches received dangerous waste discharges from research and development laboratories in the 300 Area and from fuels fabrication processes. This waste consisted of state-only toxic (WT02), corrosive (D002), chromium (D007), spent halogenated solvents (F001, F002, and F003), and spent nonhalogented solvent (F005). Accurate records are unavailable concerning the amount of dangerous waste discharged to the trenches. The estimated annual quantity of waste (item IV.B) reflects the total quantity of both regulated and nonregulated waste water that was discharged to the unit

  13. Noncoplanar VMAT for nasopharyngeal tumors: Plan quality versus treatment time

    International Nuclear Information System (INIS)

    Wild, Esther; Bangert, Mark; Nill, Simeon; Oelfke, Uwe

    2015-01-01

    Purpose: The authors investigated the potential of optimized noncoplanar irradiation trajectories for volumetric modulated arc therapy (VMAT) treatments of nasopharyngeal patients and studied the trade-off between treatment plan quality and delivery time in radiation therapy. Methods: For three nasopharyngeal patients, the authors generated treatment plans for nine different delivery scenarios using dedicated optimization methods. They compared these scenarios according to dose characteristics, number of beam directions, and estimated delivery times. In particular, the authors generated the following treatment plans: (1) a 4π plan, which is a not sequenced, fluence optimized plan that uses beam directions from approximately 1400 noncoplanar directions and marks a theoretical upper limit of the treatment plan quality, (2) a coplanar 2π plan with 72 coplanar beam directions as pendant to the noncoplanar 4π plan, (3) a coplanar VMAT plan, (4) a coplanar step and shoot (SnS) plan, (5) a beam angle optimized (BAO) coplanar SnS IMRT plan, (6) a noncoplanar BAO SnS plan, (7) a VMAT plan with rotated treatment couch, (8) a noncoplanar VMAT plan with an optimized great circle around the patient, and (9) a noncoplanar BAO VMAT plan with an arbitrary trajectory around the patient. Results: VMAT using optimized noncoplanar irradiation trajectories reduced the mean and maximum doses in organs at risk compared to coplanar VMAT plans by 19% on average while the target coverage remains constant. A coplanar BAO SnS plan was superior to coplanar SnS or VMAT; however, noncoplanar plans like a noncoplanar BAO SnS plan or noncoplanar VMAT yielded a better plan quality than the best coplanar 2π plan. The treatment plan quality of VMAT plans depended on the length of the trajectory. The delivery times of noncoplanar VMAT plans were estimated to be 6.5 min in average; 1.6 min longer than a coplanar plan but on average 2.8 min faster than a noncoplanar SnS plan with comparable

  14. Noncoplanar VMAT for nasopharyngeal tumors: Plan quality versus treatment time

    Energy Technology Data Exchange (ETDEWEB)

    Wild, Esther, E-mail: e.wild@dkfz.de; Bangert, Mark [Department of Medical Physics in Radiation Oncology, German Cancer Research Center, Im Neuenheimer Feld 280, D-69120 Heidelberg (Germany); Nill, Simeon [Joint Department of Physics at The Institute of Cancer Research and The Royal Marsden NHS Foundation Trust, London SM2 5NG (United Kingdom); Oelfke, Uwe [Joint Department of Physics at The Institute of Cancer Research and The Royal Marsden NHS Foundation Trust, London SM2 5NG, United Kingdom and Department of Medical Physics in Radiation Oncology, German Cancer Research Center, Im Neuenheimer Feld 280, D-69120 Heidelberg (Germany)

    2015-05-15

    Purpose: The authors investigated the potential of optimized noncoplanar irradiation trajectories for volumetric modulated arc therapy (VMAT) treatments of nasopharyngeal patients and studied the trade-off between treatment plan quality and delivery time in radiation therapy. Methods: For three nasopharyngeal patients, the authors generated treatment plans for nine different delivery scenarios using dedicated optimization methods. They compared these scenarios according to dose characteristics, number of beam directions, and estimated delivery times. In particular, the authors generated the following treatment plans: (1) a 4π plan, which is a not sequenced, fluence optimized plan that uses beam directions from approximately 1400 noncoplanar directions and marks a theoretical upper limit of the treatment plan quality, (2) a coplanar 2π plan with 72 coplanar beam directions as pendant to the noncoplanar 4π plan, (3) a coplanar VMAT plan, (4) a coplanar step and shoot (SnS) plan, (5) a beam angle optimized (BAO) coplanar SnS IMRT plan, (6) a noncoplanar BAO SnS plan, (7) a VMAT plan with rotated treatment couch, (8) a noncoplanar VMAT plan with an optimized great circle around the patient, and (9) a noncoplanar BAO VMAT plan with an arbitrary trajectory around the patient. Results: VMAT using optimized noncoplanar irradiation trajectories reduced the mean and maximum doses in organs at risk compared to coplanar VMAT plans by 19% on average while the target coverage remains constant. A coplanar BAO SnS plan was superior to coplanar SnS or VMAT; however, noncoplanar plans like a noncoplanar BAO SnS plan or noncoplanar VMAT yielded a better plan quality than the best coplanar 2π plan. The treatment plan quality of VMAT plans depended on the length of the trajectory. The delivery times of noncoplanar VMAT plans were estimated to be 6.5 min in average; 1.6 min longer than a coplanar plan but on average 2.8 min faster than a noncoplanar SnS plan with comparable

  15. Quality Assurance Program Plan for FFTF effluent controls. Revision 1

    International Nuclear Information System (INIS)

    Seamans, J.A.

    1995-01-01

    This Quality Assurance Program Plan is specific to environmental related activities within the FFTF Property Protected Area. The activities include effluent monitoring and Low Level Waste Certification

  16. 23 CFR 450.208 - Coordination of planning process activities.

    Science.gov (United States)

    2010-04-01

    ... process. (h) The statewide transportation planning process should be consistent with the Strategic Highway... 23 Highways 1 2010-04-01 2010-04-01 false Coordination of planning process activities. 450.208... Coordination of planning process activities. (a) In carrying out the statewide transportation planning process...

  17. Renewable Energy Zone (REZ) Transmission Planning Process

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Nathan [National Renewable Energy Laboratory (NREL), Golden, CO (United States)

    2018-03-08

    A REZ is a geographical area that enables the development of profitable, cost-effective, grid-connected renewable energy (RE). The REZ Transmission Planning Process is a proactive approach to plan, approve, and build transmission infrastructure connecting REZs to the power system which helps to increase the share of solar, wind and other RE resources in the power system while maintaining reliability and economics, and focuses on large-scale wind and solar resources that can be developed in sufficient quantities to warrant transmission system expansion and upgrades.

  18. A semi-automated tool for treatment plan-quality evaluation and clinical trial quality assurance

    Science.gov (United States)

    Wang, Jiazhou; Chen, Wenzhou; Studenski, Matthew; Cui, Yunfeng; Lee, Andrew J.; Xiao, Ying

    2013-07-01

    The goal of this work is to develop a plan-quality evaluation program for clinical routine and multi-institutional clinical trials so that the overall evaluation efficiency is improved. In multi-institutional clinical trials evaluating the plan quality is a time-consuming and labor-intensive process. In this note, we present a semi-automated plan-quality evaluation program which combines MIMVista, Java/MATLAB, and extensible markup language (XML). More specifically, MIMVista is used for data visualization; Java and its powerful function library are implemented for calculating dosimetry parameters; and to improve the clarity of the index definitions, XML is applied. The accuracy and the efficiency of the program were evaluated by comparing the results of the program with the manually recorded results in two RTOG trials. A slight difference of about 0.2% in volume or 0.6 Gy in dose between the semi-automated program and manual recording was observed. According to the criteria of indices, there are minimal differences between the two methods. The evaluation time is reduced from 10-20 min to 2 min by applying the semi-automated plan-quality evaluation program.

  19. A semi-automated tool for treatment plan-quality evaluation and clinical trial quality assurance

    International Nuclear Information System (INIS)

    Wang, Jiazhou; Chen, Wenzhou; Studenski, Matthew; Cui, Yunfeng; Xiao, Ying; Lee, Andrew J

    2013-01-01

    The goal of this work is to develop a plan-quality evaluation program for clinical routine and multi-institutional clinical trials so that the overall evaluation efficiency is improved. In multi-institutional clinical trials evaluating the plan quality is a time-consuming and labor-intensive process. In this note, we present a semi-automated plan-quality evaluation program which combines MIMVista, Java/MATLAB, and extensible markup language (XML). More specifically, MIMVista is used for data visualization; Java and its powerful function library are implemented for calculating dosimetry parameters; and to improve the clarity of the index definitions, XML is applied. The accuracy and the efficiency of the program were evaluated by comparing the results of the program with the manually recorded results in two RTOG trials. A slight difference of about 0.2% in volume or 0.6 Gy in dose between the semi-automated program and manual recording was observed. According to the criteria of indices, there are minimal differences between the two methods. The evaluation time is reduced from 10–20 min to 2 min by applying the semi-automated plan-quality evaluation program. (note)

  20. Quality assurance program plan for SNF characterization support project

    International Nuclear Information System (INIS)

    Tanke, J.M.

    1997-01-01

    This Quality Assurance Program Plan (QAPP) provides information on how the Quality Assurance Program is implemented for the Spent Nuclear Fuel Characterization Support Project. This QAPP has been developed specifically for the Spent Nuclear Fuel Characterization Support Project, per Letter of Instruction (LOI) from Duke Engineering and Services Company, letter No. DESH-9655870, dated Nov. 22, 1996. It applies to those items and tasks which affect the completion of activities identified in the work breakdown structure of the Project Management Plan (PMP) and LOI. These activities include installation of sectioning equipment and furnace, surface and subsurface examinations, sectioning for metallography, and element drying and conditioning testing, as well as project related operations within the 327 facility as it relates to the specific activities of this project. General facility activities are covered in other appropriate QA-PPS. In addition, this QAPP supports the related quality assurance activities addressed in CM-2-14, Hazardous Material Packaging and Shipping,1261 and HSRCM-1, Hanford Site Radiological Control Manual. The 327 Building is currently transitioning from being a Pacific Northwest National Laboratory (PNNL) managed facility to a Babcock and Wilcox Hanford Company (BVMC) managed facility. During this transition process existing procedures and documents will be utilized until replaced by BVMC procedures and documents. These documents conform to the requirements found in PNL-MA-70, Quality Assurance Manual and PNL-MA-8 1, Hazardous Materials Shipping Manual. The Quality Assurance Program Index (QAPI) contained in Table 1 provides a matrix which shows how project activities relate to IO CFR 830.120 and 5700.6C criteria. Quality Assurance program requirements will be addressed separate from the requirements specified in this document. Other Hanford Site organizations/companies may be utilized in support of this project and the subject organizations are

  1. Planning for implementation in a volunteer process

    International Nuclear Information System (INIS)

    Tweed, Cherry

    2014-01-01

    The framework for implementing geological disposal of the UK's higher activity radioactive wastes is laid out in the Managing Radioactive Waste Safely (MRWS) White Paper published by the UK Government in June 2008. The process to site a facility is to be staged and based on voluntarism and partnership with local communities. This process is in its early stages and this paper outlines the work being undertaken by the Nuclear Decommissioning Authority's Radioactive Waste Management Directorate (NDA-RWMD), the implementing body for geological disposal in the UK, to plan, along with others, how to deal with the waste and get it safely underground. It describes how the work programme has been developed, how the safety is demonstrated, how to provide packaging advice and develop the organisation. The processes used to build confidence in these plans are also presented

  2. Conservation Action Planning: Lessons learned from the St. Marys River watershed biodiversity conservation planning process

    Science.gov (United States)

    Patterson, Tamatha A.; Grundel, Ralph

    2014-01-01

    Conservation Action Planning (CAP) is an adaptive management planning process refined by The Nature Conservancy (TNC) and embraced worldwide as the Open Standards for the Practice of Conservation. The CAP process facilitates open, multi-institutional collaboration on a common conservation agenda through organized actions and quantified results. While specifically designed for conservation efforts, the framework is adaptable and flexible to multiple scales and can be used for any collaborative planning effort. The CAP framework addresses inception; design and development of goals, measures, and strategies; and plan implementation and evaluation. The specific components of the CAP include defining the project scope and conservation targets; assessing the ecological viability; ascertaining threats and surrounding situation; identifying opportunities and designing strategies for action; and implementing actions and monitoring results. In 2007, TNC and a multidisciplinary graduate student team from the University of Michigan's School of Natural Resources and Environment initiated a CAP for the St. Marys River, the connecting channel between Lake Superior and Lake Huron, and its local watershed. The students not only gained experience in conservation planning, but also learned lessons that notably benefited the CAP process and were valuable for any successful collaborative effort—a dedicated core team improved product quality, accelerated the timeline, and provided necessary support for ongoing efforts; an academic approach in preparation for engagement in the planning process brought applicable scientific research to the forefront, enhanced workshop facilitation, and improved stakeholder participation; and early and continuous interactions with regional stakeholders improved cooperation and built a supportive network for collaboration.

  3. Climate Action Planning Process | Climate Neutral Research Campuses | NREL

    Science.gov (United States)

    Action Planning Process Climate Action Planning Process For research campuses, NREL has developed a five-step process to develop and implement climate action plans: Determine baseline energy consumption Analyze technology options Prepare a plan and set priorities Implement the climate action plan Measure and

  4. The process approach to service quality management

    OpenAIRE

    Kamila Kowalik; Dorota Klimecka-Tatar

    2018-01-01

    In this paper a model of service quality management based on the process approach has been presented. The first part of the article contains the theoretical framework of service quality and the process approach in management. Next, quality of service process has been presented in reference to a process-based definition in quoted literature. Finally, the outcomes of a customer questionnaire concerning the validity of particular quality attributes has been presented. The collected data in relat...

  5. Strategic-Decision Quality in Public Organizations: An Information Processing Perspective.

    NARCIS (Netherlands)

    B.R.J. George (Bert); S. Desmidt (Sebastian)

    2016-01-01

    textabstractThis study draws on information processing theory to investigate predictors of strategic-decision quality in public organizations. Information processing theory argues that (a) rational planning practices contribute to strategic-decision quality by injecting information into decision

  6. References on EPA Quality Assurance Project Plans

    Science.gov (United States)

    Provides requirements for the conduct of quality management practices, including quality assurance (QA) and quality control (QC) activities, for all environmental data collection and environmental technology programs performed by or for this Agency.

  7. Quality control of static irradiation processing products

    International Nuclear Information System (INIS)

    Bao Jianzhong; Chen Xiulan; Cao Hong; Zhai Jianqing

    2002-01-01

    Based on the irradiation processing practice of the nuclear technique application laboratory of Yangzhou Institute of Agricultural Science, the quality control of irradiation processing products is discussed

  8. EPA Region 3 Quality Management Plans

    Science.gov (United States)

    Has links to resources that describe the Region's Quality Assurance Program, which is a collection of the Region's ongoing quality assurance (QA) policies, procedures, responsibilities and management systems.

  9. 78 FR 10589 - Revision of Air Quality Implementation Plan; California; Sacramento Metropolitan Air Quality...

    Science.gov (United States)

    2013-02-14

    ... Quality Implementation Plan; California; Sacramento Metropolitan Air Quality Management District... Sacramento Metropolitan Air Quality Management District (SMAQMD or District) portion of the California State... sources within the areas covered by the plan as necessary to assure that the National Ambient Air Quality...

  10. 77 FR 73320 - Approval of Air Quality Implementation Plans; California; South Coast Air Quality Management...

    Science.gov (United States)

    2012-12-10

    ... Quality Implementation Plans; California; South Coast Air Quality Management District; Prevention of... Implementation Plan (SIP) revision for the South Coast Air Quality Management District (SCAQMD or District... in a August 15, 2012 letter from the South Coast Air Quality Management District regarding specific...

  11. Maintenance planning for a deteriorating production process

    International Nuclear Information System (INIS)

    Ahmadi, Reza; Fouladirad, Mitra

    2017-01-01

    We consider a system subject to degradation, more precisely a production process with three quality states evolving according to a homogeneous Markov process. The degradation decreases the income generated by the system. To maintain revenue stream and prevent the loss of revenue, the system is inspected according to a Markov-modulated Poisson process. It is assumed that each inspection at time t incurs a time dependent cost. Each inspection improves the system health and therefore the degradation level jumps to a less deteriorated state. In absence of inspections, the system state is prone to shift to a more deteriorated state with a constant rate. The problem is to determine an optimal operating (stopping) time which truly balances some flow of income and increasing costs due to inspections, and so maximizes the expected gain of the proposed policy. To demonstrate the applicability of the explored approach and its effectiveness, some numerical results are provided. - Highlights: • An integrated model based on a quality state-dependent reward structure is explored. • The model allows the revenue stream responds to variation in the quality state. • The production process is inspected according to a Markovmodulated Poisson process. • Assuming a Markovian structure, we predict the quality state behavior. • We determine an optimal production run length based on a stopping decision rule.

  12. Stakeholders and Tourism Education. Curriculum Planning Using a Quality Management Framework.

    Science.gov (United States)

    Cooper, Chris; Westlake, John

    1998-01-01

    Stakeholder analysis provides insights useful in the educational process for tourism and hospitality education. Stakeholders can influence (1) strategic direction through curriculum planning and (2) measurement of performance through quality management. (SK)

  13. 40 CFR 64.8 - Quality improvement plan (QIP) requirements.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 15 2010-07-01 2010-07-01 false Quality improvement plan (QIP... PROGRAMS (CONTINUED) COMPLIANCE ASSURANCE MONITORING § 64.8 Quality improvement plan (QIP) requirements. (a.... (iii) Appropriate improvements to control methods. (iv) Other steps appropriate to correct control...

  14. 15 CFR 923.13 - Energy facility planning process.

    Science.gov (United States)

    2010-01-01

    ... facility planning process. The management program must contain a planning process for energy facilities... 15 Commerce and Foreign Trade 3 2010-01-01 2010-01-01 false Energy facility planning process. 923... affected public and private parties will be involved in the planning process. [61 FR 33806, June 28, 1996...

  15. MO-B-BRB-02: Maintain the Quality of Treatment Planning for Time-Constraint Cases

    International Nuclear Information System (INIS)

    Chang, J.

    2015-01-01

    The radiotherapy treatment planning process has evolved over the years with innovations in treatment planning, treatment delivery and imaging systems. Treatment modality and simulation technologies are also rapidly improving and affecting the planning process. For example, Image-guided-radiation-therapy has been widely adopted for patient setup, leading to margin reduction and isocenter repositioning after simulation. Stereotactic Body radiation therapy (SBRT) and Radiosurgery (SRS) have gradually become the standard of care for many treatment sites, which demand a higher throughput for the treatment plans even if the number of treatments per day remains the same. Finally, simulation, planning and treatment are traditionally sequential events. However, with emerging adaptive radiotherapy, they are becoming more tightly intertwined, leading to iterative processes. Enhanced efficiency of planning is therefore becoming more critical and poses serious challenge to the treatment planning process; Lean Six Sigma approaches are being utilized increasingly to balance the competing needs for speed and quality. In this symposium we will discuss the treatment planning process and illustrate effective techniques for managing workflow. Topics will include: Planning techniques: (a) beam placement, (b) dose optimization, (c) plan evaluation (d) export to RVS. Planning workflow: (a) import images, (b) Image fusion, (c) contouring, (d) plan approval (e) plan check (f) chart check, (g) sequential and iterative process Influence of upstream and downstream operations: (a) simulation, (b) immobilization, (c) motion management, (d) QA, (e) IGRT, (f) Treatment delivery, (g) SBRT/SRS (h) adaptive planning Reduction of delay between planning steps with Lean systems due to (a) communication, (b) limited resource, (b) contour, (c) plan approval, (d) treatment. Optimizing planning processes: (a) contour validation (b) consistent planning protocol, (c) protocol/template sharing, (d) semi

  16. MO-B-BRB-02: Maintain the Quality of Treatment Planning for Time-Constraint Cases

    Energy Technology Data Exchange (ETDEWEB)

    Chang, J. [New York Weill Cornell Medical Ctr (United States)

    2015-06-15

    The radiotherapy treatment planning process has evolved over the years with innovations in treatment planning, treatment delivery and imaging systems. Treatment modality and simulation technologies are also rapidly improving and affecting the planning process. For example, Image-guided-radiation-therapy has been widely adopted for patient setup, leading to margin reduction and isocenter repositioning after simulation. Stereotactic Body radiation therapy (SBRT) and Radiosurgery (SRS) have gradually become the standard of care for many treatment sites, which demand a higher throughput for the treatment plans even if the number of treatments per day remains the same. Finally, simulation, planning and treatment are traditionally sequential events. However, with emerging adaptive radiotherapy, they are becoming more tightly intertwined, leading to iterative processes. Enhanced efficiency of planning is therefore becoming more critical and poses serious challenge to the treatment planning process; Lean Six Sigma approaches are being utilized increasingly to balance the competing needs for speed and quality. In this symposium we will discuss the treatment planning process and illustrate effective techniques for managing workflow. Topics will include: Planning techniques: (a) beam placement, (b) dose optimization, (c) plan evaluation (d) export to RVS. Planning workflow: (a) import images, (b) Image fusion, (c) contouring, (d) plan approval (e) plan check (f) chart check, (g) sequential and iterative process Influence of upstream and downstream operations: (a) simulation, (b) immobilization, (c) motion management, (d) QA, (e) IGRT, (f) Treatment delivery, (g) SBRT/SRS (h) adaptive planning Reduction of delay between planning steps with Lean systems due to (a) communication, (b) limited resource, (b) contour, (c) plan approval, (d) treatment. Optimizing planning processes: (a) contour validation (b) consistent planning protocol, (c) protocol/template sharing, (d) semi

  17. Quality of family planning services in Northwest Ethiopia | Fantahun ...

    African Journals Online (AJOL)

    Background: The unmet need for family planning services in Ethiopia is believed to be high (36%) while the already available services do not appear to be optimally used by potential clients. It is thus expected that an assessment and improvement of the quality of family planning services could enhance family planning ...

  18. Considerations in setting up and planning a graft processing facility.

    Science.gov (United States)

    Koh, Mickey B C

    2017-12-01

    The graft processing facility forms one of the core components of a clinical haematopoietic stem cell transplant program. The quality of a graft is instrumental in leading to consistent and reproducible outcomes of engraftment and other parameters. As such, meticulous planning and consideration is required and will include core elements including physical design and clinical correlates. The successful running of such a facility depends on an overarching quality program and adherence to local and international regulatory guidelines. Copyright © 2017 King Faisal Specialist Hospital & Research Centre. Published by Elsevier B.V. All rights reserved.

  19. NIF Projects Controls and Information Systems Software Quality Assurance Plan

    Energy Technology Data Exchange (ETDEWEB)

    Fishler, B

    2011-03-18

    Quality achievement for the National Ignition Facility (NIF) and the National Ignition Campaign (NIC) is the responsibility of the NIF Projects line organization as described in the NIF and Photon Science Directorate Quality Assurance Plan (NIF QA Plan). This Software Quality Assurance Plan (SQAP) is subordinate to the NIF QA Plan and establishes quality assurance (QA) activities for the software subsystems within Controls and Information Systems (CIS). This SQAP implements an activity level software quality assurance plan for NIF Projects as required by the LLNL Institutional Software Quality Assurance Program (ISQAP). Planned QA activities help achieve, assess, and maintain appropriate quality of software developed and/or acquired for control systems, shot data systems, laser performance modeling systems, business applications, industrial control and safety systems, and information technology systems. The objective of this SQAP is to ensure that appropriate controls are developed and implemented for management planning, work execution, and quality assessment of the CIS organization's software activities. The CIS line organization places special QA emphasis on rigorous configuration control, change management, testing, and issue tracking to help achieve its quality goals.

  20. NIF Projects Controls and Information Systems Software Quality Assurance Plan

    International Nuclear Information System (INIS)

    Fishler, B.

    2011-01-01

    Quality achievement for the National Ignition Facility (NIF) and the National Ignition Campaign (NIC) is the responsibility of the NIF Projects line organization as described in the NIF and Photon Science Directorate Quality Assurance Plan (NIF QA Plan). This Software Quality Assurance Plan (SQAP) is subordinate to the NIF QA Plan and establishes quality assurance (QA) activities for the software subsystems within Controls and Information Systems (CIS). This SQAP implements an activity level software quality assurance plan for NIF Projects as required by the LLNL Institutional Software Quality Assurance Program (ISQAP). Planned QA activities help achieve, assess, and maintain appropriate quality of software developed and/or acquired for control systems, shot data systems, laser performance modeling systems, business applications, industrial control and safety systems, and information technology systems. The objective of this SQAP is to ensure that appropriate controls are developed and implemented for management planning, work execution, and quality assessment of the CIS organization's software activities. The CIS line organization places special QA emphasis on rigorous configuration control, change management, testing, and issue tracking to help achieve its quality goals.

  1. PROCESS VARIABILITY REDUCTION THROUGH STATISTICAL PROCESS CONTROL FOR QUALITY IMPROVEMENT

    Directory of Open Access Journals (Sweden)

    B.P. Mahesh

    2010-09-01

    Full Text Available Quality has become one of the most important customer decision factors in the selection among the competing product and services. Consequently, understanding and improving quality is a key factor leading to business success, growth and an enhanced competitive position. Hence quality improvement program should be an integral part of the overall business strategy. According to TQM, the effective way to improve the Quality of the product or service is to improve the process used to build the product. Hence, TQM focuses on process, rather than results as the results are driven by the processes. Many techniques are available for quality improvement. Statistical Process Control (SPC is one such TQM technique which is widely accepted for analyzing quality problems and improving the performance of the production process. This article illustrates the step by step procedure adopted at a soap manufacturing company to improve the Quality by reducing process variability using Statistical Process Control.

  2. PLANNING THE QUALITY OF LIFE FOR TIMISOARA GROWTH POLE

    Directory of Open Access Journals (Sweden)

    Cătălina-Livia POPA

    2014-06-01

    Full Text Available This paper aims to show that planning the quality of life at local level through economic development can be a new approach for policy makers and community in improving quality of life. In this purpose, the Quality Function Deployment (QFD model will be use to planning the quality of life and to identify the main directions of economic development to support improving the quality of life at the level of Timisoara Growth Pole from Romania. The dimensions of quality of life are analyzed starting from the point of view of inhabitants. The results include a new approach in which the dimensions of quality of life are the key element that orients economic development in order to improve the quality of life of human being. The case study results refer to the main elements of quality of life at Timisoara Growth Pole and the relevant directions of economic development to improve the quality of life for Timisoara Growth Pole.

  3. Quality Management Plan for EPA Region 1

    Science.gov (United States)

    The QMP describes policies, procedures & management systems within EPA NE that govern quality assurance & quality control activities supporting the transparency & scientific defensibility of environmental data collected, used & disseminated by the Region.

  4. The CHPRC Columbia River Protection Project Quality Assurance Project Plan

    Energy Technology Data Exchange (ETDEWEB)

    Fix, N. J.

    2008-11-30

    Pacific Northwest National Laboratory researchers are working on the CHPRC Columbia River Protection Project (hereafter referred to as the Columbia River Project). This is a follow-on project, funded by CH2M Hill Plateau Remediation Company, LLC (CHPRC), to the Fluor Hanford, Inc. Columbia River Protection Project. The work scope consists of a number of CHPRC funded, related projects that are managed under a master project (project number 55109). All contract releases associated with the Fluor Hanford Columbia River Project (Fluor Hanford, Inc. Contract 27647) and the CHPRC Columbia River Project (Contract 36402) will be collected under this master project. Each project within the master project is authorized by a CHPRC contract release that contains the project-specific statement of work. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the Columbia River Project staff.

  5. The CHPRC Columbia River Protection Project Quality Assurance Project Plan

    International Nuclear Information System (INIS)

    Fix, N.J.

    2008-01-01

    Pacific Northwest National Laboratory researchers are working on the CHPRC Columbia River Protection Project (hereafter referred to as the Columbia River Project). This is a follow-on project, funded by CH2M Hill Plateau Remediation Company, LLC (CHPRC), to the Fluor Hanford, Inc. Columbia River Protection Project. The work scope consists of a number of CHPRC funded, related projects that are managed under a master project (project number 55109). All contract releases associated with the Fluor Hanford Columbia River Project (Fluor Hanford, Inc. Contract 27647) and the CHPRC Columbia River Project (Contract 36402) will be collected under this master project. Each project within the master project is authorized by a CHPRC contract release that contains the project-specific statement of work. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the Columbia River Project staff

  6. Structural and Process Quality of Danish Preschools

    DEFF Research Database (Denmark)

    Slot, Pauline Louise; Bleses, Dorthe; Justice, Laura M.

    2018-01-01

    Structural quality in childcare centers is considered a precondition for process quality, which in turn is related to children’s outcomes. However, the evidence on relations between structural and process quality is mixed. Moreover, despite strong theoretical claims, empirical evidence supporting...

  7. Software quality assurance plan for PORFLOW-3D

    International Nuclear Information System (INIS)

    Maheras, S.J.

    1993-03-01

    This plan describes the steps taken by the Idaho National Engineering Laboratory Subsurface and Environmental Modeling Unit personnel to implement software quality assurance procedures for the PORFLOW-3D computer code. PORFLOW-3D was used to conduct radiological performance assessments at the Savannah River Site. software quality assurance procedures for PORFLOW-3D include software acquisition, installation, testing, operation, maintenance, and retirement. Configuration control and quality assurance procedures are also included or referenced in this plan

  8. Business Process Modelling for Measuring Quality

    NARCIS (Netherlands)

    Heidari, F.; Loucopoulos, P.; Brazier, F.M.

    2013-01-01

    Business process modelling languages facilitate presentation, communication and analysis of business processes with different stakeholders. This paper proposes an approach that drives specification and measurement of quality requirements and in doing so relies on business process models as

  9. Identifying Contractors’ Planned Quality Costs in Indonesian Construction Projects

    Directory of Open Access Journals (Sweden)

    Puti F. Marzuki

    2014-12-01

    Full Text Available In a very competitive construction industry, quality costs have to be measured to be able to identify potential quality problem areas and to focus attention on work output improvement opportunities. The awareness of contractors on the importance of quality costs could be reflected in the extent of their quality costs planning. This paper presents an identification of planned quality costs in three construction projects executed by two large Indonesian contractors, a state-owned company and a private company in Jakarta. The objective is to enable the contractors to elaborate their quality costs planning and thereby improve their work output based on the findi ngs. Quality costs are first grouped into three categories: prevention, appraisal, and failure costs. Based on the works of previous researchers, a list of quality management activities that should be covered in each quality costs category is then created. The contractors’ planned quality costs data for each category are identified and collected through interviews and questionnaire surveys that refer to the list. Quality costs are expressed as a percentage of contract value. It is revealed that although large contractors already have certain knowledge on quality costs in construction projects, these costs are not planned in a structured way through an analysis of systematic quality costs records. Through cost categorization it is also shown that higher prevention and appraisal costs lead to lower failure costs. It is then concluded that a lot of work is still to be done by the contractors to set up a quality costs recording system which can serve as a basis for their quality improvement planning.

  10. Vega library for processing DICOM data required in Monte Carlo verification of radiotherapy treatment plans

    International Nuclear Information System (INIS)

    Locke, C.; Zavgorodni, S.; British Columbia Cancer Agency, Vancouver Island Center, Victoria BC

    2008-01-01

    Monte Carlo (MC) methods provide the most accurate to-date dose calculations in heterogeneous media and complex geometries, and this spawns increasing interest in incorporating MC calculations into treatment planning quality assurance process. This involves MC dose calculations for clinically produced treatment plans. To perform these calculations, a number of treatment plan parameters specifying radiation beam

  11. ANALYSIS OF QUALITY COSTS FOR STATISTICA QUALITY CONTROL PLANNING

    Directory of Open Access Journals (Sweden)

    N. Chiadamrong

    2017-12-01

    Full Text Available Quality has become one or the most important force leading to organizational success and company growth in national and international markets. The return-on-investment from strong and effective quality programs is providing excellent profitability results in firms with effective quality strategies. Due to the wide variation in quality results, the search for the genuine keys to success in quality has become a matter of deep concern to management of companies. This paper suggests a way to quantifying quality costs. As a result, the appropriate quality strategies can be adjusted and set to match with each company situation based on the categorization of the quality costs suggested. This outcome can, then, be used as a guideline for manufactures in setting their suitable quality program, which establishes the proper balance between the costs and customer services.

  12. Process-Based Quality (PBQ) Tools Development

    Energy Technology Data Exchange (ETDEWEB)

    Cummins, J.L.

    2001-12-03

    The objective of this effort is to benchmark the development of process-based quality tools for application in CAD (computer-aided design) model-based applications. The processes of interest are design, manufacturing, and quality process applications. A study was commissioned addressing the impact, current technologies, and known problem areas in application of 3D MCAD (3-dimensional mechanical computer-aided design) models and model integrity on downstream manufacturing and quality processes. The downstream manufacturing and product quality processes are profoundly influenced and dependent on model quality and modeling process integrity. The goal is to illustrate and expedite the modeling and downstream model-based technologies for available or conceptual methods and tools to achieve maximum economic advantage and advance process-based quality concepts.

  13. Sandia National Laboratories Advanced Simulation and Computing (ASC) software quality plan : ASC software quality engineering practices Version 3.0.

    Energy Technology Data Exchange (ETDEWEB)

    Turgeon, Jennifer L.; Minana, Molly A.; Hackney, Patricia; Pilch, Martin M.

    2009-01-01

    The purpose of the Sandia National Laboratories (SNL) Advanced Simulation and Computing (ASC) Software Quality Plan is to clearly identify the practices that are the basis for continually improving the quality of ASC software products. Quality is defined in the US Department of Energy/National Nuclear Security Agency (DOE/NNSA) Quality Criteria, Revision 10 (QC-1) as 'conformance to customer requirements and expectations'. This quality plan defines the SNL ASC Program software quality engineering (SQE) practices and provides a mapping of these practices to the SNL Corporate Process Requirement (CPR) 001.3.6; 'Corporate Software Engineering Excellence'. This plan also identifies ASC management's and the software project teams responsibilities in implementing the software quality practices and in assessing progress towards achieving their software quality goals. This SNL ASC Software Quality Plan establishes the signatories commitments to improving software products by applying cost-effective SQE practices. This plan enumerates the SQE practices that comprise the development of SNL ASC's software products and explains the project teams opportunities for tailoring and implementing the practices.

  14. 77 FR 52277 - Approval of Air Quality Implementation Plans; California; South Coast Air Quality Management...

    Science.gov (United States)

    2012-08-29

    ... Quality Implementation Plans; California; South Coast Air Quality Management District; Prevention of... rule. SUMMARY: EPA is proposing approval of a permitting rule submitted for the South Coast Air Quality Management District (District) portion of the California State Implementation Plan (SIP). The State is...

  15. 77 FR 12524 - Approval and Promulgation of Air Quality Implementation Plans; Indiana; Lead Ambient Air Quality...

    Science.gov (United States)

    2012-03-01

    ... Promulgation of Air Quality Implementation Plans; Indiana; Lead Ambient Air Quality Standards AGENCY... Indiana State Implementation Plan (SIP) for lead (Pb) under the Clean Air Act (CAA). This submittal incorporates the National Ambient Air Quality Standards (NAAQS) for Pb promulgated by EPA in 2008. DATES...

  16. 75 FR 65594 - Approval and Promulgation of Air Quality Implementation Plans; Ohio; Ohio Ambient Air Quality...

    Science.gov (United States)

    2010-10-26

    ... Promulgation of Air Quality Implementation Plans; Ohio; Ohio Ambient Air Quality Standards AGENCY... the Ohio Administrative Code (OAC) relating to the consolidation of Ohio's Ambient Air Quality Standards (AAQS) into Ohio's State Implementation Plan (SIP) under the Clean Air Act. On April 8, 2009, and...

  17. Renewing focus on family planning service quality globally.

    Science.gov (United States)

    Hancock, Nancy L; Stuart, Gretchen S; Tang, Jennifer H; Chibwesha, Carla J; Stringer, Jeffrey S A; Chi, Benjamin H

    2016-01-01

    Reducing the global unmet need for contraception is currently a priority for many governments, multi-lateral initiatives, non-governmental organizations, and donors. Evidence strongly suggests that the provision of quality family planning services can increase uptake, prevalence, and continuation of contraception. While an accepted framework to define the components of family planning service quality exists, translating this framework into assessment tools that are accessible, easily utilized, and valid for service providers has remained a challenge. We propose new approaches to improve the standardization and accessibility of family planning service quality assessment tools to simplify family planning service quality evaluation. With easier approaches to program evaluation, quality improvements can be performed more swiftly to help increase uptake and continuation of contraception to improve the health of women and their families.

  18. Quality improvement initiatives: the missed opportunity for health plans.

    Science.gov (United States)

    Fernandez-Lopez, Sara; Lennert, Barbara

    2009-11-01

    The increase in healthcare cost without direct improvements in health outcomes, coupled with a desire to expand access to the large uninsured population, has underscored the importance of quality initiatives and organizations that provide more affordable healthcare by maximizing value. To determine the knowledge of managed care organizations about quality organizations and initiatives and to identify potential opportunities in which pharmaceutical companies could collaborate with health plans in the development and implementation of quality initiatives. We conducted a survey of 36 pharmacy directors and 15 medical directors of different plans during a Managed Care Network meeting in 2008. The represented plans cover almost 74 million lives in commercial, Medicare, and Medicaid programs, or a combination of them. The responses show limited knowledge among pharmacy and medical directors about current quality organizations and initiatives, except for quality organizations that provide health plan quality accreditation. The results also reveal an opportunity for pharmaceutical companies to collaborate with private health plans in the development of quality initiatives, especially those related to drug utilization, such as patient adherence and education and correct drug utilization. Our survey shows clearly that today's focus for managed care organizations is mostly limited to the organizations that provide health plan quality accreditation, with less focus on other organizations.

  19. 78 FR 54835 - Air Quality Implementation Plan; Alabama; Attainment Plan for the Troy Area 2008 Lead...

    Science.gov (United States)

    2013-09-06

    ... 4] Air Quality Implementation Plan; Alabama; Attainment Plan for the Troy Area 2008 Lead... Troy 2008 Lead nonattainment area (hereafter referred to as the ``Troy Area'' or ``Area''). The Troy... submittal regarding the attainment plan based on Alabama's attainment demonstration for the Troy Area. The...

  20. Quality assessment for VMAT prostate radiotherapy planning based on data envelopment analysis

    International Nuclear Information System (INIS)

    Lin, Kuan-Min; Simpson, John; Raith, Andrea; Ehrgott, Matthias; Sasso, Giuseppe

    2013-01-01

    The majority of commercial radiotherapy treatment planning systems requires planners to iteratively adjust the plan parameters in order to find a satisfactory plan. This iterative trial-and-error nature of radiotherapy treatment planning results in an inefficient planning process and in order to reduce such inefficiency, plans can be accepted without achieving the best attainable quality. We propose a quality assessment method based on data envelopment analysis (DEA) to address this inefficiency. This method compares a plan of interest to a set of past delivered plans and searches for evidence of potential further improvement. With the assistance of DEA, planners will be able to make informed decisions on whether further planning is required and ensure that a plan is only accepted when the plan quality is close to the best attainable one. We apply the DEA method to 37 prostate plans using two assessment parameters: rectal generalized equivalent uniform dose (gEUD) as the input and D95 (the minimum dose that is received by 95% volume of a structure) of the planning target volume (PTV) as the output. The percentage volume of rectum overlapping PTV is used to account for anatomical variations between patients and is included in the model as a non-discretionary output variable. Five plans that are considered of lesser quality by DEA are re-optimized with the goal to further improve rectal sparing. After re-optimization, all five plans improve in rectal gEUD without clinically considerable deterioration of the PTV D95 value. For the five re-optimized plans, the rectal gEUD is reduced by an average of 1.84 Gray (Gy) with only an average reduction of 0.07 Gy in PTV D95. The results demonstrate that DEA can correctly identify plans with potential improvements in terms of the chosen input and outputs. (paper)

  1. Process monitoring using a Quality and Technical Surveillance Program

    International Nuclear Information System (INIS)

    Rafferty, C.A.

    1995-01-01

    The purpose of process monitoring using a Quality and Technical Surveillance Program was to help ensure manufactured clad vents sets fully met technical and quality requirements established by the manufacturer and the customer, and that line and program management were immediately alerted if any aspect of the manufacturing activities drifted out of acceptable limits. The Quality and Technical Surveillance Program provided a planned, scheduled approach to monitor key processes and documentation illuminated potential problem areas early enough to permit timely corrective actions to reverse negative trends that, if left uncorrected, could have resulted in deficient hardware. Significant schedule and cost impacts were eliminated

  2. A prioritization methodology to strategic planning process

    International Nuclear Information System (INIS)

    Rondinelli Junior, Francisco; Cherif, Hadj Slimane

    2009-01-01

    In the process of formulation of a Strategic Plan, there is always a step that deals with choices among different options and strategies. To do that a prioritization methodology has to be applied in order to achieve the higher needs identified along the analysis and evaluation of problems. To assign priorities within a set of needs/problems of a strategic nature and identified within various areas of activity or different sectors, it is proposed a methodology that envisage the use of specific attributes for which a graded scale of values is established for each need/problem, which, at the end of the process, allows a quantitative comparison among them. The methodology presented in this paper was developed following an approach that has been used in many areas over the last 20 years by various public and private institutions, and also by international organizations involved in promotion and development work. (author)

  3. LERF Basin 44 Process Test Plan

    International Nuclear Information System (INIS)

    LUECK, K.J.

    1999-01-01

    This document presents a plan to process a portion of the Liquid Effluent Retention Facility (LERF) Basin 44 wastewater through the 200 Area Effluent Treatment Facility (ETF). The objective of this process test is to determine the most effective/efficient method to treat the wastewater currently stored in LERF Basin 44. The process test will determine the operational parameters necessary to comply with facility effluent discharge permit limits (Ecology 1995) and the Environmental Restoration Disposal Facility (ERDF) acceptance criteria (BHI-00139), while achieving ALARA goals and maintaining the integrity of facility equipment. A major focus of the test plan centers on control of contamination due to leaks and/or facility maintenance. As a pre-startup item, all known leaks will be fixed before the start of the test. During the course of the test, a variety of contamination control measures will be evaluated for implementation during the treatment of the remaining Basin 44 inventory. Of special interest will be techniques and tools used to prevent contamination spread during sampling and when opening contaminated facility equipment/piping. At the conclusion of the test, a post ALARA review will be performed to identify lessons learned from the test run which can be applied to the treatment of the remaining Basin 44 inventory. The volume of wastewater to be treated during this test run is 500,000 gallons. This volume limit is necessary to maintain the ETF radiological inventory limits per the approved authorization basis. The duration of the process test is approximately 30 days

  4. Developing a Quality Improvement Process to Optimize Faculty Success

    Science.gov (United States)

    Merillat, Linda; Scheibmeir, Monica

    2016-01-01

    As part of a major shift to embed quality improvement processes within a School of Nursing at a medium-sized Midwestern university, a faculty enrichment program using a Plan-Do-Act-Study design was implemented. A central focus for the program was the development and maintenance of an online faculty resource center identified as "My Faculty…

  5. 222-S Laboratory Quality Assurance Plan. Revision 1

    International Nuclear Information System (INIS)

    Meznarich, H.K.

    1995-01-01

    This Quality Assurance Plan provides,quality assurance (QA) guidance, regulatory QA requirements (e.g., 10 CFR 830.120), and quality control (QC) specifications for analytical service. This document follows the U.S Department of Energy (DOE) issued Hanford Analytical Services Quality Assurance Plan (HASQAP). In addition, this document meets the objectives of the Quality Assurance Program provided in the WHC-CM-4-2, Section 2.1. Quality assurance elements required in the Guidelines and Specifications for Preparing Quality Assurance Program Plans (QAMS-004) and Interim Guidelines and Specifications for Preparing Quality Assurance Project Plans (QAMS-005) from the US Environmental Protection Agency (EPA) are covered throughout this document. A quality assurance index is provided in the Appendix A. This document also provides and/or identifies the procedural information that governs laboratory operations. The personnel of the 222-S Laboratory and the Standards Laboratory including managers, analysts, QA/QC staff, auditors, and support staff shall use this document as guidance and instructions for their operational and quality assurance activities. Other organizations that conduct activities described in this document for the 222-S Laboratory shall follow this QA/QC document

  6. Research Quality Assessment and Planning Journals. The Italian Perspective.

    Directory of Open Access Journals (Sweden)

    Bruno Zanon

    2014-02-01

    Full Text Available Assessment of research products is a crucial issue for universities and research institutions faced with internationalization and competition. Disciplines are reacting differently to this challenge, and planning, in its various forms – from urban design to process­oriented sectors – is under strain because the increasingly common assessment procedures based on the number of articles published in ranked journals and on citation data are not generally accepted. The reputation of journals, the impact of publications, and the profiles of scholars are increasingly defined by means of indexes such as impact factor and citations counts, but these metrics are questioned because they do not take account of all journals and magazines – in particular those published in languages other than English – and they do not consider teaching and other activities typical of academics and which have a real impact on planning practices at the local level. In Italy the discussion is particularly heated because assessment procedures are recent, the disciplinary community is not used to publishing in ranked international journals, and the Italian literature is not attuned to the international quality criteria. The paper reviews the recent debate on planning journals and research assessment. It focuses on the Italian case from the perspective of improving current practices.

  7. Use of plan quality degradation to evaluate tradeoffs in delivery efficiency and clinical plan metrics arising from IMRT optimizer and sequencer compromises

    Science.gov (United States)

    Wilkie, Joel R.; Matuszak, Martha M.; Feng, Mary; Moran, Jean M.; Fraass, Benedick A.

    2013-01-01

    site and on the stage in the process at which the levels are limited. The cost of improved delivery efficiency, in terms of plan quality degradation, increased as the number of intensity levels in the sequencer or optimizer decreased. The degradation was more substantial for the head and neck cases relative to the prostate cases, particularly when fewer than 20 intensity levels were used. Plan quality degradation was less severe when the number of intensity levels was limited in the optimizer rather than the sequencer. Conclusions: Analysis of plan quality degradation allows for a quantitative assessment of the compromises in clinical plan quality as delivery efficiency is improved, in order to determine the optimal delivery settings. The technique is based on physician-determined quality degradation factors and can be extended to other clinical situations where investigation of various tradeoffs is warranted. PMID:23822412

  8. Quality assurance program plan fuel supply shutdown project

    International Nuclear Information System (INIS)

    Metcalf, I.L.

    1998-01-01

    This Quality Assurance Program plan (QAPP) describes how the Fuel Supply Shutdown (FSS) project organization implements the quality assurance requirements of HNF-MP-599, Project Hanford Quality Assurance Program Description (QAPD) and the B and W Hanford Company Quality Assurance Program Plan (QAPP), FSP-MP-004. The QAPP applies to facility structures, systems, and components and to activities (e.g., design, procurement, testing, operations, maintenance, etc.) that could affect structures, systems, and components. This QAPP also provides a roadmap of applicable Project Hanford Policies and Procedures (PHPP) which may be utilized by the FSS project organization to implement the requirements of this QAPP

  9. Hanford Sampling Quality Management Plan (HSQMP)

    International Nuclear Information System (INIS)

    Hyatt, J.E.

    1995-06-01

    HSQMP establishes quality requirements in response to DOE Order 5700. 6C and to 10 Code of Federal Regulations 830.120. HSQMP is designed to meet the needs of Richland Operations Office for controlling the quality of services provided by sampling operations. It is issued through the Analytical Services Program of the Waste Programs Division. This document describes the Environmental Sampling and Analysis Program activities considered to represent the best management activities necessary to achieve a sampling program with adequate control

  10. Quality assurance program plan for radionuclide airborne emissions monitoring

    International Nuclear Information System (INIS)

    Boom, R.J.

    1995-03-01

    This Quality Assurance Program Plan identifies quality assurance program requirements and addresses the various Westinghouse Hanford Company organizations and their particular responsibilities in regards to sample and data handling of airborne emissions. The Hanford Site radioactive airborne emissions requirements are defined in National Emissions Standards for Hazardous Air Pollutants (NESHAP), Code of Federal Regulations, Title 40, Part 61, Subpart H (EPA 1991a). Reporting of the emissions to the US Department of Energy is performed in compliance with requirements of US Department of Energy, Richland Operations Office Order 5400.1, General Environmental Protection Program (DOE-RL 1988). This Quality Assurance Program Plan is prepared in accordance with and to the requirements of QAMS-004/80, Guidelines and Specifications for Preparing Quality Assurance Program Plans (EPA 1983). Title 40 CFR Part 61, Appendix B, Method 114, Quality Assurance Methods (EPA 1991b) specifies the quality assurance requirements and that a program plan should be prepared to meet the requirements of this regulation. This Quality Assurance Program Plan identifies NESHAP responsibilities and how the Westinghouse Hanford Company Environmental, Safety, Health, and Quality Assurance Division will verify that the methods are properly implemented

  11. Visions, Strategic Planning, and Quality--More than Hype.

    Science.gov (United States)

    Kaufman, Roger

    1996-01-01

    Discusses the need to shift from the old models for organizational development to the new methods of quality management and continuous improvement, visions and visioning, and strategic planning, despite inappropriate criticisms they receive. (AEF)

  12. Managing Air Quality - Multi-Pollutant Planning and Control

    Science.gov (United States)

    Describes how planning controls for multiple pollutants at the same time can save money and time and achieve significant benefits, and how control strategies can address both climate change and air quality.

  13. Explicit optimization of plan quality measures in intensity-modulated radiation therapy treatment planning.

    Science.gov (United States)

    Engberg, Lovisa; Forsgren, Anders; Eriksson, Kjell; Hårdemark, Björn

    2017-06-01

    To formulate convex planning objectives of treatment plan multicriteria optimization with explicit relationships to the dose-volume histogram (DVH) statistics used in plan quality evaluation. Conventional planning objectives are designed to minimize the violation of DVH statistics thresholds using penalty functions. Although successful in guiding the DVH curve towards these thresholds, conventional planning objectives offer limited control of the individual points on the DVH curve (doses-at-volume) used to evaluate plan quality. In this study, we abandon the usual penalty-function framework and propose planning objectives that more closely relate to DVH statistics. The proposed planning objectives are based on mean-tail-dose, resulting in convex optimization. We also demonstrate how to adapt a standard optimization method to the proposed formulation in order to obtain a substantial reduction in computational cost. We investigated the potential of the proposed planning objectives as tools for optimizing DVH statistics through juxtaposition with the conventional planning objectives on two patient cases. Sets of treatment plans with differently balanced planning objectives were generated using either the proposed or the conventional approach. Dominance in the sense of better distributed doses-at-volume was observed in plans optimized within the proposed framework. The initial computational study indicates that the DVH statistics are better optimized and more efficiently balanced using the proposed planning objectives than using the conventional approach. © 2017 American Association of Physicists in Medicine.

  14. Internal quality assurance reviews: challenges and processes ...

    African Journals Online (AJOL)

    Internal quality assurance reviews: challenges and processes – Walter Sisulu University\\'s Business, Management Sciences and Law Faculty. ... This article examines some of the challenges and processes followed by six of the departments ...

  15. Quality planning and executive force of program files in quality management

    International Nuclear Information System (INIS)

    Sun Danyu

    2008-01-01

    This paper discussed the quality planning in quality management. In the quality planning, the quality objectives, the quality liabilities and the procedures shall be developed, grading supervise shall be exercised, quality assurance program shall be established, and requirements on resource and documents shall be defined. At the same time, we shall also intensify and enhance the execute force of program documentation, supervise and inspect the implementation result, establish detailed check indicators, and bring up the requirement on how to improve the quality of products. (author)

  16. Near-facility environmental monitoring quality assurance project plan

    International Nuclear Information System (INIS)

    McKinney, S.M.

    1997-01-01

    This Quality Assurance Project Plan addresses the quality assurance requirements for the activities associated with the preoperational and near facility environmental monitoring performed by Waste Management Federal Services, Inc., Northwest Operations and supersedes WHC-EP-0538-2. This plan applies to all sampling and monitoring activities performed by waste management Federal Services, Inc., Northwest Operations in implementing facility environmental monitoring at the Hanford Site

  17. ITER safety studies: starting the quality plan code AINA

    International Nuclear Information System (INIS)

    Dies, J.; Rivas, J. C.; Bargallo, E.

    2010-01-01

    This contribution discusses the implementation of the Quality Plan AINA Code 2.0. The work has affected areas such as the life cycle model, the software reliability plan, the design of the equipment or software tools to use, and has finally produced a new code.

  18. 23 CFR Appendix A to Part 450 - Linking the Transportation Planning and NEPA Processes

    Science.gov (United States)

    2010-04-01

    ... quality, and biology). Senior managers at transportation and partner agencies can arrange a variety of... strengthened link of the transportation planning and NEPA processes. Formal and informal mentoring on an intra...

  19. MO-B-BRB-03: Systems Engineering Tools for Treatment Planning Process Optimization in Radiation Medicine

    International Nuclear Information System (INIS)

    Kapur, A.

    2015-01-01

    The radiotherapy treatment planning process has evolved over the years with innovations in treatment planning, treatment delivery and imaging systems. Treatment modality and simulation technologies are also rapidly improving and affecting the planning process. For example, Image-guided-radiation-therapy has been widely adopted for patient setup, leading to margin reduction and isocenter repositioning after simulation. Stereotactic Body radiation therapy (SBRT) and Radiosurgery (SRS) have gradually become the standard of care for many treatment sites, which demand a higher throughput for the treatment plans even if the number of treatments per day remains the same. Finally, simulation, planning and treatment are traditionally sequential events. However, with emerging adaptive radiotherapy, they are becoming more tightly intertwined, leading to iterative processes. Enhanced efficiency of planning is therefore becoming more critical and poses serious challenge to the treatment planning process; Lean Six Sigma approaches are being utilized increasingly to balance the competing needs for speed and quality. In this symposium we will discuss the treatment planning process and illustrate effective techniques for managing workflow. Topics will include: Planning techniques: (a) beam placement, (b) dose optimization, (c) plan evaluation (d) export to RVS. Planning workflow: (a) import images, (b) Image fusion, (c) contouring, (d) plan approval (e) plan check (f) chart check, (g) sequential and iterative process Influence of upstream and downstream operations: (a) simulation, (b) immobilization, (c) motion management, (d) QA, (e) IGRT, (f) Treatment delivery, (g) SBRT/SRS (h) adaptive planning Reduction of delay between planning steps with Lean systems due to (a) communication, (b) limited resource, (b) contour, (c) plan approval, (d) treatment. Optimizing planning processes: (a) contour validation (b) consistent planning protocol, (c) protocol/template sharing, (d) semi

  20. MO-B-BRB-01: Optimize Treatment Planning Process in Clinical Environment

    International Nuclear Information System (INIS)

    Feng, W.

    2015-01-01

    The radiotherapy treatment planning process has evolved over the years with innovations in treatment planning, treatment delivery and imaging systems. Treatment modality and simulation technologies are also rapidly improving and affecting the planning process. For example, Image-guided-radiation-therapy has been widely adopted for patient setup, leading to margin reduction and isocenter repositioning after simulation. Stereotactic Body radiation therapy (SBRT) and Radiosurgery (SRS) have gradually become the standard of care for many treatment sites, which demand a higher throughput for the treatment plans even if the number of treatments per day remains the same. Finally, simulation, planning and treatment are traditionally sequential events. However, with emerging adaptive radiotherapy, they are becoming more tightly intertwined, leading to iterative processes. Enhanced efficiency of planning is therefore becoming more critical and poses serious challenge to the treatment planning process; Lean Six Sigma approaches are being utilized increasingly to balance the competing needs for speed and quality. In this symposium we will discuss the treatment planning process and illustrate effective techniques for managing workflow. Topics will include: Planning techniques: (a) beam placement, (b) dose optimization, (c) plan evaluation (d) export to RVS. Planning workflow: (a) import images, (b) Image fusion, (c) contouring, (d) plan approval (e) plan check (f) chart check, (g) sequential and iterative process Influence of upstream and downstream operations: (a) simulation, (b) immobilization, (c) motion management, (d) QA, (e) IGRT, (f) Treatment delivery, (g) SBRT/SRS (h) adaptive planning Reduction of delay between planning steps with Lean systems due to (a) communication, (b) limited resource, (b) contour, (c) plan approval, (d) treatment. Optimizing planning processes: (a) contour validation (b) consistent planning protocol, (c) protocol/template sharing, (d) semi

  1. MO-B-BRB-03: Systems Engineering Tools for Treatment Planning Process Optimization in Radiation Medicine

    Energy Technology Data Exchange (ETDEWEB)

    Kapur, A. [Long Island Jewish Medical Center (United States)

    2015-06-15

    The radiotherapy treatment planning process has evolved over the years with innovations in treatment planning, treatment delivery and imaging systems. Treatment modality and simulation technologies are also rapidly improving and affecting the planning process. For example, Image-guided-radiation-therapy has been widely adopted for patient setup, leading to margin reduction and isocenter repositioning after simulation. Stereotactic Body radiation therapy (SBRT) and Radiosurgery (SRS) have gradually become the standard of care for many treatment sites, which demand a higher throughput for the treatment plans even if the number of treatments per day remains the same. Finally, simulation, planning and treatment are traditionally sequential events. However, with emerging adaptive radiotherapy, they are becoming more tightly intertwined, leading to iterative processes. Enhanced efficiency of planning is therefore becoming more critical and poses serious challenge to the treatment planning process; Lean Six Sigma approaches are being utilized increasingly to balance the competing needs for speed and quality. In this symposium we will discuss the treatment planning process and illustrate effective techniques for managing workflow. Topics will include: Planning techniques: (a) beam placement, (b) dose optimization, (c) plan evaluation (d) export to RVS. Planning workflow: (a) import images, (b) Image fusion, (c) contouring, (d) plan approval (e) plan check (f) chart check, (g) sequential and iterative process Influence of upstream and downstream operations: (a) simulation, (b) immobilization, (c) motion management, (d) QA, (e) IGRT, (f) Treatment delivery, (g) SBRT/SRS (h) adaptive planning Reduction of delay between planning steps with Lean systems due to (a) communication, (b) limited resource, (b) contour, (c) plan approval, (d) treatment. Optimizing planning processes: (a) contour validation (b) consistent planning protocol, (c) protocol/template sharing, (d) semi

  2. MO-B-BRB-01: Optimize Treatment Planning Process in Clinical Environment

    Energy Technology Data Exchange (ETDEWEB)

    Feng, W. [New York Presbyterian Hospital (United States)

    2015-06-15

    The radiotherapy treatment planning process has evolved over the years with innovations in treatment planning, treatment delivery and imaging systems. Treatment modality and simulation technologies are also rapidly improving and affecting the planning process. For example, Image-guided-radiation-therapy has been widely adopted for patient setup, leading to margin reduction and isocenter repositioning after simulation. Stereotactic Body radiation therapy (SBRT) and Radiosurgery (SRS) have gradually become the standard of care for many treatment sites, which demand a higher throughput for the treatment plans even if the number of treatments per day remains the same. Finally, simulation, planning and treatment are traditionally sequential events. However, with emerging adaptive radiotherapy, they are becoming more tightly intertwined, leading to iterative processes. Enhanced efficiency of planning is therefore becoming more critical and poses serious challenge to the treatment planning process; Lean Six Sigma approaches are being utilized increasingly to balance the competing needs for speed and quality. In this symposium we will discuss the treatment planning process and illustrate effective techniques for managing workflow. Topics will include: Planning techniques: (a) beam placement, (b) dose optimization, (c) plan evaluation (d) export to RVS. Planning workflow: (a) import images, (b) Image fusion, (c) contouring, (d) plan approval (e) plan check (f) chart check, (g) sequential and iterative process Influence of upstream and downstream operations: (a) simulation, (b) immobilization, (c) motion management, (d) QA, (e) IGRT, (f) Treatment delivery, (g) SBRT/SRS (h) adaptive planning Reduction of delay between planning steps with Lean systems due to (a) communication, (b) limited resource, (b) contour, (c) plan approval, (d) treatment. Optimizing planning processes: (a) contour validation (b) consistent planning protocol, (c) protocol/template sharing, (d) semi

  3. 78 FR 63934 - Approval of Air Quality Implementation Plans; California; El Dorado County Air Quality Management...

    Science.gov (United States)

    2013-10-25

    ...] Approval of Air Quality Implementation Plans; California; El Dorado County Air Quality Management District... California for the El Dorado County Air Quality Management District (EDAQMD) portion of the California SIP... 24, 1987 Federal Register, May 25, 1988, U.S. EPA, Air Quality Management Division, Office of Air...

  4. 78 FR 19990 - Approval and Promulgation of Air Quality Implementation Plans; Ohio; Ohio Ambient Air Quality...

    Science.gov (United States)

    2013-04-03

    ... Promulgation of Air Quality Implementation Plans; Ohio; Ohio Ambient Air Quality Standards; Correction AGENCY... approved revisions to Ohio regulations that consolidated air quality standards in a new chapter of rules... State's air quality standards into Ohio Administrative Code (OAC) 3745-25 and modifying an assortment of...

  5. 75 FR 65572 - Approval and Promulgation of Air Quality Implementation Plans; Ohio; Ohio Ambient Air Quality...

    Science.gov (United States)

    2010-10-26

    ... Promulgation of Air Quality Implementation Plans; Ohio; Ohio Ambient Air Quality Standards AGENCY... Ohio Administrative Code (OAC) relating to the consolidation of Ohio's Ambient Air Quality Standards... apply to Ohio's SIP. Incorporating the air quality standards into Ohio's SIP helps assure that...

  6. 77 FR 12482 - Approval and Promulgation of Air Quality Implementation Plans; Indiana; Lead Ambient Air Quality...

    Science.gov (United States)

    2012-03-01

    ... Promulgation of Air Quality Implementation Plans; Indiana; Lead Ambient Air Quality Standards AGENCY... incorporates the National Ambient Air Quality Standards (NAAQS) for Pb promulgated by EPA in 2008. DATES: This... FR 66964) and codified at 40 CFR 50.16, ``National primary and secondary ambient air quality...

  7. Planning urban settlements for quality of life

    DEFF Research Database (Denmark)

    Boje Groth, N.; Hansen, K.E.; Björnberg, U.

    Notatet er et indlæg på den Europæiske Økonomiske Kommissions (ECE) konference om by- og regionforskning, tema II: "Research on the Quality of Life in Urban Settlements, Warszawa, maj 1976. I notatet opstilles en begrebsramme for livskvalitetsbegrebet, og man diskuterer hvorledes livskvalitetsana......Notatet er et indlæg på den Europæiske Økonomiske Kommissions (ECE) konference om by- og regionforskning, tema II: "Research on the Quality of Life in Urban Settlements, Warszawa, maj 1976. I notatet opstilles en begrebsramme for livskvalitetsbegrebet, og man diskuterer hvorledes...

  8. Westinghouse Water Reactor Divisions quality assurance plan

    International Nuclear Information System (INIS)

    1977-09-01

    The Quality Assurance Program used by Westinghouse Water Reactor Divisions is described. The purpose of the program is to assure that the design, materials, and workmanship on Nuclear Steam Supply System (NSSS) equipment meet applicable safety requirements, fulfill the requirements of the contracts with the applicants, and satisfy the applicable codes, standards, and regulatory requirements. This program satisfies the NRC Quality Assurance Criteria, 10CFR50 Appendix B, to the extent that these criteria apply to safety related NSSS equipment. Also, it follows the regulatory position provided in NRC regulatory guides and the requirements of ANSI Standard N45.2.12 as identified in this Topical Report

  9. 300 Area Process Trenches Postclosure Plan

    International Nuclear Information System (INIS)

    Badden, J.W.

    1998-05-01

    The 300 Area Process Trenches (300 APT) certified closure under a modified closure option and in compliance with Condition II.K.3 oft he Hartford Facility Dangerous Waste Permit (Penit) (Ecology 1994). Modified closure has been determined to be the appropriate closure option for this unit due to groundwater that remains contaminated from past operations at the 300 APT. Corrective actions required for dangerous waste constituents remaining in groundwater will occur pursuant to the 300 APT Resource Conservation and Recovery Act (RCRA) Final Status Facility Ground Water Monitoring Plan, the Hanford Site Wide Dangerous Waste Permit, and in conjunction with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) remedial actions at the 300-FF-5 Groundwater Operable Unit (OU) pursuant to the Record of Decision (ROD) (EPA 1996). This postclosure plan identifies the modified closure actions required at the unit under postclosure care. It contains a description of the unit, past closure actions, and postclosure care requirements subject to compliance under the Permit (condition II.K.3)

  10. Quality Assurance/Quality Control Issues for Intraoperative Planning and Adaptive Repeat Planning of Image-Guided Prostate Implants

    International Nuclear Information System (INIS)

    Zaider, Marco; Cohen, Gilad; Meli, Jerome; Rosenfeld, Anatoly B.

    2008-01-01

    The quality assurance/quality control purpose is this. We design a treatment plan, and we wish to be as certain as reasonably possible that the treatment is delivered as planned. In the case of conventionally planned prostate brachytherapy, implementing to the letter the implantation plan is rarely attainable and therefore can require adaptive replanning (a quality control issue). The reasons for this state of affairs include changes in the prostate shape and volume during implantation and treatment delivery (e.g., edema resolution) and unavoidable inaccuracy in the placement of the seeds in the prostate. As a result, quality-control activities (e.g., the need to monitor-ideally, on the fly-the target and urethral and rectal dosage) must be also addressed

  11. Quality assurance plan, Westinghouse Water Reactor Divisions

    Energy Technology Data Exchange (ETDEWEB)

    1976-03-01

    The Quality Assurance Program used by Westinghouse Nuclear Energy Systems Water Reactor Divisions is described. The purpose of the program is to assure that the design, materials, and workmanship on Nuclear Steam Supply System (NSSS) equipment meet applicable safety requirements, fulfill the requirements of the contracts with the applicants, and satisfy the applicable codes, standards, and regulatory requirements.

  12. Spatial quality, location theory and spatial planning

    NARCIS (Netherlands)

    Assink, Mathijs; Groenendijk, Nico

    2009-01-01

    This paper deals with spatial quality as a possible factor in location choices made by companies. Actual location decisions as well as location theory have changed over time. In the industrial era primary “hard” cost factors were dominant, to be supplemented by agglomeration factors ever since the

  13. Evaluation of plan quality assurance models for prostate cancer patients based on fully automatically generated Pareto-optimal treatment plans.

    Science.gov (United States)

    Wang, Yibing; Breedveld, Sebastiaan; Heijmen, Ben; Petit, Steven F

    2016-06-07

    IMRT planning with commercial Treatment Planning Systems (TPSs) is a trial-and-error process. Consequently, the quality of treatment plans may not be consistent among patients, planners and institutions. Recently, different plan quality assurance (QA) models have been proposed, that could flag and guide improvement of suboptimal treatment plans. However, the performance of these models was validated using plans that were created using the conventional trail-and-error treatment planning process. Consequently, it is challenging to assess and compare quantitatively the accuracy of different treatment planning QA models. Therefore, we created a golden standard dataset of consistently planned Pareto-optimal IMRT plans for 115 prostate patients. Next, the dataset was used to assess the performance of a treatment planning QA model that uses the overlap volume histogram (OVH). 115 prostate IMRT plans were fully automatically planned using our in-house developed TPS Erasmus-iCycle. An existing OVH model was trained on the plans of 58 of the patients. Next it was applied to predict DVHs of the rectum, bladder and anus of the remaining 57 patients. The predictions were compared with the achieved values of the golden standard plans for the rectum D mean, V 65, and V 75, and D mean of the anus and the bladder. For the rectum, the prediction errors (predicted-achieved) were only  -0.2  ±  0.9 Gy (mean  ±  1 SD) for D mean,-1.0  ±  1.6% for V 65, and  -0.4  ±  1.1% for V 75. For D mean of the anus and the bladder, the prediction error was 0.1  ±  1.6 Gy and 4.8  ±  4.1 Gy, respectively. Increasing the training cohort to 114 patients only led to minor improvements. A dataset of consistently planned Pareto-optimal prostate IMRT plans was generated. This dataset can be used to train new, and validate and compare existing treatment planning QA models, and has been made publicly available. The OVH model was highly accurate

  14. The two (quality) faces of HCHP (Harvard Community Health Plan).

    Science.gov (United States)

    Burda, D

    1991-03-18

    When it comes to total quality management, Harvard Community Health Plan has two personalities. It's using the principles espoused by such TQM gurus as Joseph Juran to reduce costs and improve quality in its clinics and offices. But HCHP also is enhancing its image in the healthcare industry by teaching TQM principles to others for big bucks.

  15. Quality Assurance Program Plan for radionuclide airborne emissions monitoring

    International Nuclear Information System (INIS)

    Vance, L.M.

    1993-07-01

    This Quality Assurance Program Plan (QAPP) describes the quality assurance requirements and responsibilities for radioactive airborne emissions measurements activities from regulated stacks are controlled at the Hanford Site. Detailed monitoring requirements apply to stacks exceeding 1% of the standard of 10 mrem annual effective dose equivalent to the maximally exposed individual from operations of the Hanford Site

  16. Quality Assessment of Family Planning Services in Ife/Ijesa ...

    African Journals Online (AJOL)

    Context: Medical audit in healthcare has a goal to monitor and upgrade the standard of health care in a setting. Whether a client will accept, use effectively and continue to practice contraception depends on the quality of services rendered. Objective: To assess the quality of our family planning services as perceived by our ...

  17. Embedding soil quality in land-use planning

    NARCIS (Netherlands)

    Wezel AP van; Weijden AGG van der; Wijnen HJ van; Mulder Ch; Wijnen HJ van; MNP; LER; LDL

    2006-01-01

    Changes in land use in the Netherlands are anticipated on a large scale. Soil quality, however, hardly plays a role in spatial planning, which was reason enough to analyse the relationship between land use and soil quality on a national scale using ecological data. Despite major changes in land

  18. Quality Assurance Program Plan for radionuclide airborne emissions monitoring

    Energy Technology Data Exchange (ETDEWEB)

    Vance, L.M.

    1993-07-01

    This Quality Assurance Program Plan (QAPP) describes the quality assurance requirements and responsibilities for radioactive airborne emissions measurements activities from regulated stacks are controlled at the Hanford Site. Detailed monitoring requirements apply to stacks exceeding 1% of the standard of 10 mrem annual effective dose equivalent to the maximally exposed individual from operations of the Hanford Site.

  19. Process safety improvement--quality and target zero.

    Science.gov (United States)

    Van Scyoc, Karl

    2008-11-15

    Process safety practitioners have adopted quality management principles in design of process safety management systems with positive effect, yet achieving safety objectives sometimes remain a distant target. Companies regularly apply tools and methods which have roots in quality and productivity improvement. The "plan, do, check, act" improvement loop, statistical analysis of incidents (non-conformities), and performance trending popularized by Dr. Deming are now commonly used in the context of process safety. Significant advancements in HSE performance are reported after applying methods viewed as fundamental for quality management. In pursuit of continual process safety improvement, the paper examines various quality improvement methods, and explores how methods intended for product quality can be additionally applied to continual improvement of process safety. Methods such as Kaizen, Poke yoke, and TRIZ, while long established for quality improvement, are quite unfamiliar in the process safety arena. These methods are discussed for application in improving both process safety leadership and field work team performance. Practical ways to advance process safety, based on the methods, are given.

  20. Process safety improvement-Quality and target zero

    International Nuclear Information System (INIS)

    Van Scyoc, Karl

    2008-01-01

    Process safety practitioners have adopted quality management principles in design of process safety management systems with positive effect, yet achieving safety objectives sometimes remain a distant target. Companies regularly apply tools and methods which have roots in quality and productivity improvement. The 'plan, do, check, act' improvement loop, statistical analysis of incidents (non-conformities), and performance trending popularized by Dr. Deming are now commonly used in the context of process safety. Significant advancements in HSE performance are reported after applying methods viewed as fundamental for quality management. In pursuit of continual process safety improvement, the paper examines various quality improvement methods, and explores how methods intended for product quality can be additionally applied to continual improvement of process safety. Methods such as Kaizen, Poke yoke, and TRIZ, while long established for quality improvement, are quite unfamiliar in the process safety arena. These methods are discussed for application in improving both process safety leadership and field work team performance. Practical ways to advance process safety, based on the methods, are given

  1. Process safety improvement-Quality and target zero

    Energy Technology Data Exchange (ETDEWEB)

    Van Scyoc, Karl [Det Norske Veritas (U.S.A.) Inc., DNV Energy Solutions, 16340 Park Ten Place, Suite 100, Houston, TX 77084 (United States)], E-mail: karl.van.scyoc@dnv.com

    2008-11-15

    Process safety practitioners have adopted quality management principles in design of process safety management systems with positive effect, yet achieving safety objectives sometimes remain a distant target. Companies regularly apply tools and methods which have roots in quality and productivity improvement. The 'plan, do, check, act' improvement loop, statistical analysis of incidents (non-conformities), and performance trending popularized by Dr. Deming are now commonly used in the context of process safety. Significant advancements in HSE performance are reported after applying methods viewed as fundamental for quality management. In pursuit of continual process safety improvement, the paper examines various quality improvement methods, and explores how methods intended for product quality can be additionally applied to continual improvement of process safety. Methods such as Kaizen, Poke yoke, and TRIZ, while long established for quality improvement, are quite unfamiliar in the process safety arena. These methods are discussed for application in improving both process safety leadership and field work team performance. Practical ways to advance process safety, based on the methods, are given.

  2. Early environmental planning: A process for power line corridor selection

    International Nuclear Information System (INIS)

    Haagenstad, T.; Bare, C.M.

    1998-01-01

    Los Alamos National Laboratory (LANL) conducted an environmental planning study in the fall of 1997 to help determine the best alternative for upgrading the Laboratory's electrical power system. Alternatives considered included an on-site power generation facility and two corridors for a 10-mile-long 115-kV power line. This planning process was conducted prior to the formal National Environmental Policy Act (NEPA) review. The goals were to help select the best proposed action, to recommend modifications and mitigation measures for each alternative for a more environmentally sound project, and to avoid potential delays once the formal Department of Energy review process began. Significant constraints existed from a planning perspective, including operational issues such as existing outdoor high explosives testing areas, as well as environmental issues including threatened and endangered species habitats, multiple archeological sites, contaminated areas, and aesthetics. The study had to be completed within 45 days to meet project schedule needs. The process resulted in a number of important recommendations. While the construction and operation of the on-site power generation facility could have minimal environmental impacts, the need for a new air quality permit would create severe cost and schedule constraints for the project. From an environmental perspective, construction and operation of a power line within either corridor was concluded to be a viable alternative. However, impacts with either corridor would have to be reduced through specific recommended alignment modifications and mitigation measures

  3. Analyzing the quality robustness of chemotherapy plans with respect to model uncertainties.

    Science.gov (United States)

    Hoffmann, Anna; Scherrer, Alexander; Küfer, Karl-Heinz

    2015-01-01

    Mathematical models of chemotherapy planning problems contain various biomedical parameters, whose values are difficult to quantify and thus subject to some uncertainty. This uncertainty propagates into the therapy plans computed on these models, which poses the question of robustness to the expected therapy quality. This work introduces a combined approach for analyzing the quality robustness of plans in terms of dosing levels with respect to model uncertainties in chemotherapy planning. It uses concepts from multi-criteria decision making for studying parameters related to the balancing between the different therapy goals, and concepts from sensitivity analysis for the examination of parameters describing the underlying biomedical processes and their interplay. This approach allows for a profound assessment of a therapy plan, how stable its quality is with respect to parametric changes in the used mathematical model. Copyright © 2014 Elsevier Inc. All rights reserved.

  4. Putting ecology in environmental remediation: The strategic planning process

    International Nuclear Information System (INIS)

    Kapustka, L.A.; Williams, B.A.

    1991-01-01

    Traditional ecological studies have been conducted on many sites impacted by hazardous wastes. Yet in many cases, the information obtained has had limited value in the selection of remediation options. This paper discusses the importance of developing an ecological risk-based strategic plan to fulfill the scientific and social needs demanded in the remediation and restoration of hazardous waste sites. Ecological issues need to be considered seriously at the earliest phases of the scoping process. The decisions regarding selection of assessment endpoints and data quality objectives must be incorporated from the start to insure that cost-efficient and useful measurements are used. It is too late to develop effective ecological studies after the engineering decisions have been made. Strategic planning that integrates ecological concerns will minimize the frustration and the cost associated with clean up of hazardous waste sites and maximize the likelihood of successful site restoration

  5. Compression planning for continuous improvement in quality programs

    International Nuclear Information System (INIS)

    Willis, Y.A.; Hood, F.C.

    1992-01-01

    This paper describes Compression Planning, an innovative approach for planning in groups. This participative and structured approach is especially suitable for technical and highly regulated organizations. Compression Planning was applied to the first organization-wide effort at training integration for regulatory compliance, at Battelle Pacific Northwest Laboratory (PNL), a multi-program national laboratory. The planning process was judged as measurably superior to PNL's customary planning. Within 10 days a training policy was issued and an action plan drafted. The participants produced a report identifying and prioritizing 33 key training issues; began to data gather and solicit input from personnel Lab-wide, producing a 2-volume training inventory; and formulated 14 recommendations for implementation. Two years later the plan is still evolving, as PNL training continues to develop, consistent with Continuous Improvement Process objectives

  6. Aligning Business Process Quality and Information System Quality

    OpenAIRE

    Heinrich, Robert

    2013-01-01

    Business processes and information systems mutually affect each other in non-trivial ways. Frequently, the business process design and the information system design are not well aligned. This means that business processes are designed without taking the information system impact into account, and vice versa. Missing alignment at design time often results in quality problems at runtime, such as large response times of information systems, large process execution times, overloaded information s...

  7. Considerations for using data envelopment analysis for the assessment of radiotherapy treatment plan quality.

    Science.gov (United States)

    Simpson, John; Raith, Andrea; Rouse, Paul; Ehrgott, Matthias

    2017-10-09

    Purpose The operations research method of data envelopment analysis (DEA) shows promise for assessing radiotherapy treatment plan quality. The purpose of this paper is to consider the technical requirements for using DEA for plan assessment. Design/methodology/approach In total, 41 prostate treatment plans were retrospectively analysed using the DEA method. The authors investigate the impact of DEA weight restrictions with reference to the ability to differentiate plan performance at a level of clinical significance. Patient geometry influences plan quality and the authors compare differing approaches for managing patient geometry within the DEA method. Findings The input-oriented DEA method is the method of choice when performing plan analysis using the key undesirable plan metrics as the DEA inputs. When considering multiple inputs, it is necessary to constrain the DEA input weights in order to identify potential plan improvements at a level of clinical significance. All tested approaches for the consideration of patient geometry yielded consistent results. Research limitations/implications This work is based on prostate plans and individual recommendations would therefore need to be validated for other treatment sites. Notwithstanding, the method that requires both optimised DEA weights according to clinical significance and appropriate accounting for patient geometric factors is universally applicable. Practical implications DEA can potentially be used during treatment plan development to guide the planning process or alternatively used retrospectively for treatment plan quality audit. Social implications DEA is independent of the planning system platform and therefore has the potential to be used for multi-institutional quality audit. Originality/value To the authors' knowledge, this is the first published examination of the optimal approach in the use of DEA for radiotherapy treatment plan assessment.

  8. Plan for advanced microelectronics processing technology application

    Energy Technology Data Exchange (ETDEWEB)

    Goland, A.N.

    1990-10-01

    The ultimate objective of the tasks described in the research agreement was to identify resources primarily, but not exclusively, within New York State that are available for the development of a Center for Advanced Microelectronics Processing (CAMP). Identification of those resources would enable Brookhaven National Laboratory to prepare a program plan for the CAMP. In order to achieve the stated goal, the principal investigators undertook to meet the key personnel in relevant NYS industrial and academic organizations to discuss the potential for economic development that could accompany such a Center and to gauge the extent of participation that could be expected from each interested party. Integrated of these discussions was to be achieved through a workshop convened in the summer of 1990. The culmination of this workshop was to be a report (the final report) outlining a plan for implementing a Center in the state. As events unfolded, it became possible to identify the elements of a major center for x-ray lithography on Lone Island at Brookhaven National Laboratory. The principal investigators were than advised to substitute a working document based upon that concept in place of a report based upon the more general CAMP workshop originally envisioned. Following that suggestion from the New York State Science and Technology Foundation, the principals established a working group consisting of representatives of the Grumman Corporation, Columbia University, the State University of New York at Stony Brook, and Brookhaven National Laboratory. Regular meetings and additional communications between these collaborators have produced a preproposal that constitutes the main body of the final report required by the contract. Other components of this final report include the interim report and a brief description of the activities which followed the establishment of the X-ray Lithography Center working group.

  9. Adopting software quality measures for healthcare processes.

    Science.gov (United States)

    Yildiz, Ozkan; Demirörs, Onur

    2009-01-01

    In this study, we investigated the adoptability of software quality measures for healthcare process measurement. Quality measures of ISO/IEC 9126 are redefined from a process perspective to build a generic healthcare process quality measurement model. Case study research method is used, and the model is applied to a public hospital's Entry to Care process. After the application, weak and strong aspects of the process can be easily observed. Access audibility, fault removal, completeness of documentation, and machine utilization are weak aspects and these aspects are the candidates for process improvement. On the other hand, functional completeness, fault ratio, input validity checking, response time, and throughput time are the strong aspects of the process.

  10. Improving the quality of manually acquired data: Applying the theory of planned behaviour to data quality

    International Nuclear Information System (INIS)

    Murphy, Glen D.

    2009-01-01

    The continued reliance of manual data capture in engineering asset intensive organisations highlights the critical role played by those responsible for recording raw data. The potential for data quality variance across individual operators also exposes the need to better manage this particular group. This paper evaluates the relative importance of the human factors associated with data quality. Using the theory of planned behaviour this paper considers the impact of attitudes, perceptions and behavioural intentions on the data collection process in an engineering asset context. Two additional variables are included, those of time pressure and operator feedback. Time pressure is argued to act as a moderator between intention and data collection behaviour, while perceived behavioural control will moderate the relationship between feedback and data collection behaviour. Overall the paper argues that the presence of best practice procedures or threats of disciplinary sanction are insufficient controls to determine data quality. Instead those concerned with improving the data collection performance of operators should consider the operator's perceptions of group attitude towards data quality, the level of feedback provided to data collectors and the impact of time pressures on procedure compliance. A range of practical recommendations are provided to those wishing to improve the quality of their manually acquired data.

  11. 78 FR 18936 - Revision to the California State Implementation Plan, South Coast Air Quality Management Plan

    Science.gov (United States)

    2013-03-28

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2012-0920; FRL-9779-1] Revision to the California State Implementation Plan, South Coast Air Quality Management Plan AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve a revision to the South...

  12. River Basin Management Plans - Institutional framework and planning process

    DEFF Research Database (Denmark)

    Frederiksen, Pia; Nielsen, Helle Ørsted; Pedersen, Anders Branth

    2011-01-01

    The report it a deliverable to the Waterpraxis project, based on research carried out in WP3. It is based on country reports from analyses of water planning in one river basin district in each of the countries Sweden, Finland, Latvia, Lithuania, Poland, Germany and Denmark, and it compares the in...

  13. Measures of Quality in Business Process Modelling

    Directory of Open Access Journals (Sweden)

    Radek Hronza

    2015-06-01

    Full Text Available Business process modelling and analysing is undoubtedly one of the most important parts of Applied (Business Informatics. Quality of business process models (diagrams is crucial for any purpose in this area. The goal of a process analyst’s work is to create generally understandable, explicit and error free models. If a process is properly described, created models can be used as an input into deep analysis and optimization. It can be assumed that properly designed business process models (similarly as in the case of correctly written algorithms contain characteristics that can be mathematically described. Besides it will be possible to create a tool that will help process analysts to design proper models. As part of this review will be conducted systematic literature review in order to find and analyse business process model’s design and business process model’s quality measures. It was found that mentioned area had already been the subject of research investigation in the past. Thirty-three suitable scietific publications and twenty-two quality measures were found. Analysed scientific publications and existing quality measures do not reflect all important attributes of business process model’s clarity, simplicity and completeness. Therefore it would be appropriate to add new measures of quality.

  14. OSUL2013: Fostering Organizational Change through a Grassroots Planning Process

    Science.gov (United States)

    Schlosser, Melanie

    2011-01-01

    This paper provides background on planning and organizational culture change in libraries and describes a grassroots planning process taking place at the Ohio State University Libraries. Now in its third phase, the process aims to create a long-term plan for the organization while fostering a more collaborative, innovative culture.

  15. Software process improvement, quality assurance and measurement

    NARCIS (Netherlands)

    Trienekens, J.J.M.; Kusters, R.J.; Balla, K.; Kontogiannis, K.; Zou, Y.; Di Penta, M.

    2006-01-01

    The aim of this workshop was to present and discuss emergent software quality improvement approaches, with an emphasis on practical applications. Different views on the improvement of software processes, software products, and their interrelations, have been addressed during the workshop.

  16. Quality Assurance Program Plan (QAPP) Waste Management Project

    Energy Technology Data Exchange (ETDEWEB)

    VOLKMAN, D.D.

    1999-10-27

    This document is the Quality Assurance Program Plan (QAPP) for Waste Management Federal Services of Hanford, Inc. (WMH), that implements the requirements of the Project Hanford Management Contract (PHMC), HNF-MP-599, Project Hanford Quality Assurance Program Description (QAPD) document, and the Hanford Federal Facility Agreement with Consent Order (Tri-Party Agreement), Sections 6.5 and 7.8. WHM is responsible for the treatment, storage, and disposal of liquid and solid wastes generated at the Hanford Site as well as those wastes received from other US Department of Energy (DOE) and non-DOE sites. WMH operations include the Low-Level Burial Grounds, Central Waste Complex (a mixed-waste storage complex), a nonradioactive dangerous waste storage facility, the Transuranic Storage Facility, T Plant, Waste Receiving and Processing Facility, 200 Area Liquid Effluent Facility, 200 Area Treated Effluent Disposal Facility, the Liquid Effluent Retention Facility, the 242-A Evaporator, 300 Area Treatment Effluent Disposal Facility, the 340 Facility (a radioactive liquid waste handling facility), 222-S Laboratory, the Waste Sampling and Characterization Facility, and the Hanford TRU Waste Program.

  17. QUALITY LOSS FUNCTION FOR MACHINING PROCESS ACCURACY

    Directory of Open Access Journals (Sweden)

    Adrian Stere PARIS

    2017-05-01

    Full Text Available The main goal of the paper is to propose new quality loss models for machining process accuracy in the classical case “zero the best”, MMF and Harris type. In addition a numerical example illustrates that the choose regression functions are directly linked with the quality loss of manufacturing process. The proposed models can be adapted for the “maximal the best” and “nominal the best” cases.

  18. Facility Effluent Monitoring Plan for the 325 Radiochemical Processing Laboratory

    International Nuclear Information System (INIS)

    Shields, K.D.; Ballinger, M.Y.

    1999-03-01

    This Facility Effluent Monitoring Plan (FEMP) has been prepared for the 325 Building Radiochemical Processing Laboratory (RPL) at the Pacific Northwest National Laboratory (PNNL) to meet the requirements in DOE Order 5400.1, ''General Environmental Protection Programs.'' This FEMP has been prepared for the RPL primarily because it has a ''major'' (potential to emit >0.1 mrem/yr) emission point for radionuclide air emissions according to the annual National Emission Standards for Hazardous Air Pollutants (NESHAP) assessment performed. This section summarizes the airborne and liquid effluents and the inventory based NESHAP assessment for the facility. The complete monitoring plan includes characterization of effluent streams, monitoring/sampling design criteria, a description of the monitoring systems and sample analysis, and quality assurance requirements. The RPL at PNNL houses radiochemistry research, radioanalytical service, radiochemical process development, and hazardous and radioactive mixed waste treatment activities. The laboratories and specialized facilities enable work ranging from that with nonradioactive materials to work with picogram to kilogram quantities of fissionable materials and up to megacurie quantities of other radionuclides. The special facilities within the building include two shielded hot-cell areas that provide for process development or analytical chemistry work with highly radioactive materials and a waste treatment facility for processing hazardous, mixed radioactive, low-level radioactive, and transuranic wastes generated by PNNL activities

  19. Facility Effluent Monitoring Plan for the 325 Radiochemical Processing Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    Shields, K.D.; Ballinger, M.Y.

    1999-04-02

    This Facility Effluent Monitoring Plan (FEMP) has been prepared for the 325 Building Radiochemical Processing Laboratory (RPL) at the Pacific Northwest National Laboratory (PNNL) to meet the requirements in DOE Order 5400.1, ''General Environmental Protection Programs.'' This FEMP has been prepared for the RPL primarily because it has a ''major'' (potential to emit >0.1 mrem/yr) emission point for radionuclide air emissions according to the annual National Emission Standards for Hazardous Air Pollutants (NESHAP) assessment performed. This section summarizes the airborne and liquid effluents and the inventory based NESHAP assessment for the facility. The complete monitoring plan includes characterization of effluent streams, monitoring/sampling design criteria, a description of the monitoring systems and sample analysis, and quality assurance requirements. The RPL at PNNL houses radiochemistry research, radioanalytical service, radiochemical process development, and hazardous and radioactive mixed waste treatment activities. The laboratories and specialized facilities enable work ranging from that with nonradioactive materials to work with picogram to kilogram quantities of fissionable materials and up to megacurie quantities of other radionuclides. The special facilities within the building include two shielded hot-cell areas that provide for process development or analytical chemistry work with highly radioactive materials and a waste treatment facility for processing hazardous, mixed radioactive, low-level radioactive, and transuranic wastes generated by PNNL activities.

  20. Quality costs in the production process

    OpenAIRE

    J. Michalska

    2006-01-01

    Purpose: The aim of this paper is showing the relationship of the quality costs with a production process. In this paper it was worked out and introduced the way of marking the documents with regard to the quality costs.Design/methodology/approach: In the frames of own research it has been analysed the quality costs in the production process from the documents marked using the worked out way of marking.Findings: On the basis of the own research it can be stated, that the majority of the eleme...

  1. The Columbia River Protection Supplemental Technologies Quality Assurance Project Plan

    International Nuclear Information System (INIS)

    Fix, Anne

    2007-01-01

    The U.S. Department of Energy (DOE) has conducted interim groundwater remedial activities on the Hanford Site since the mid-1990s for several groundwater contamination plumes. DOE established the Columbia River Protection Supplemental Technologies Project (Technologies Project) in 2006 to evaluate alternative treatment technologies. The objectives for the technology project are as follows: develop a 300 Area polyphosphate treatability test to immobilize uranium, design and test infiltration of a phosphate/apatite technology for Sr-90 at 100-N, perform carbon tetrachloride and chloroform attenuation parameter studies, perform vadose zone chromium characterization and geochemistry studies, perform in situ biostimulation of chromium studies for a reducing barrier at 100-D, and perform a treatability test for phytoremediation for Sr-90 at 100-N. This document provides the quality assurance guidelines that will be followed by the Technologies Project. This Quality Assurance Project Plan is based on the quality assurance requirements of DOE Order 414.1C, Quality Assurance, and 10 CFR 830, Subpart A--Quality Assurance Requirements as delineated in Pacific Northwest National Laboratory?s Standards-Based Management System. In addition, the technology project is subject to the Environmental Protection Agency (EPA) Requirements for Quality Assurance Project Plans (EPA/240/B-01/003, QA/R-5). The Hanford Analytical Services Quality Assurance Requirements Documents (HASQARD, DOE/RL-96-68) apply to portions of this project and to the subcontractors. HASQARD requirements are discussed within applicable sections of this plan.

  2. TU-FG-201-10: Quality Management of Accelerated Partial Breast Irradiation (APBI) Plans

    International Nuclear Information System (INIS)

    Ji, H; Lorio, V; Cernica, G; Han, J; Nurhussien, M; Nasr, N; Hong, R

    2016-01-01

    Purpose: Since 2008, over 700 patients received high dose rate (HDR) APBI treatment at Virginia Hospital Center. The complexity involved in the planning process demonstrated a broad variation between patient geometry across all applicators, in relation to anatomical regions of interest. A quality management program instituting various metrics was implemented in March 2013 with the goal of ensuring an optimal plan is achieved for each patient. Methods: For each plan, an in-house complexity index, geometric conformity index, and plan quality index were defined. These indices were obtained for all patients treated. For patients treated after the implementation, the conformity index and quality index were maximized while other dosimetric limits, such as maximum skin and rib doses, were strictly kept. Subsequently, all evaluation parameters and applicator information were placed in a database for cross-evaluation with similar complexity. Results: Both the conformity and quality indices show good correlation with the complexity index. They decrease as complexity increases for all applicators. Multi lumen type balloon applicators demonstrate a minimal advantage over single lumen applicators in increasingly complex patient geometries, as compared to SAVI applicators which showed considerably greater advantage in these circumstances. After the implementation of the in-house planning protocol, there is a direct improvement of quality for SAVI plans. Conclusion: Due to their interstitial nature, SAVI devices show a better conformity in comparison to balloon-based devices regardless of the number of lumens, especially in complex cases. The quality management program focuses on optimizing indices by utilizing prior planning knowledge based on complexity levels. The database of indices assists in decision making and has subsequently aided in balancing the experience level among planners. This approach has made APBI planning more robust for patient care, with a measurable

  3. TU-FG-201-10: Quality Management of Accelerated Partial Breast Irradiation (APBI) Plans

    Energy Technology Data Exchange (ETDEWEB)

    Ji, H; Lorio, V; Cernica, G [Associates In Medical Physics, Lanham, MD (United States); Virginia Hospital Center, Arlington, VA (United States); Han, J; Nurhussien, M; Nasr, N; Hong, R [Virginia Hospital Center, Arlington, VA (United States)

    2016-06-15

    Purpose: Since 2008, over 700 patients received high dose rate (HDR) APBI treatment at Virginia Hospital Center. The complexity involved in the planning process demonstrated a broad variation between patient geometry across all applicators, in relation to anatomical regions of interest. A quality management program instituting various metrics was implemented in March 2013 with the goal of ensuring an optimal plan is achieved for each patient. Methods: For each plan, an in-house complexity index, geometric conformity index, and plan quality index were defined. These indices were obtained for all patients treated. For patients treated after the implementation, the conformity index and quality index were maximized while other dosimetric limits, such as maximum skin and rib doses, were strictly kept. Subsequently, all evaluation parameters and applicator information were placed in a database for cross-evaluation with similar complexity. Results: Both the conformity and quality indices show good correlation with the complexity index. They decrease as complexity increases for all applicators. Multi lumen type balloon applicators demonstrate a minimal advantage over single lumen applicators in increasingly complex patient geometries, as compared to SAVI applicators which showed considerably greater advantage in these circumstances. After the implementation of the in-house planning protocol, there is a direct improvement of quality for SAVI plans. Conclusion: Due to their interstitial nature, SAVI devices show a better conformity in comparison to balloon-based devices regardless of the number of lumens, especially in complex cases. The quality management program focuses on optimizing indices by utilizing prior planning knowledge based on complexity levels. The database of indices assists in decision making and has subsequently aided in balancing the experience level among planners. This approach has made APBI planning more robust for patient care, with a measurable

  4. Process perspective on image quality evaluation

    Science.gov (United States)

    Leisti, Tuomas; Halonen, Raisa; Kokkonen, Anna; Weckman, Hanna; Mettänen, Marja; Lensu, Lasse; Ritala, Risto; Oittinen, Pirkko; Nyman, Göte

    2008-01-01

    The psychological complexity of multivariate image quality evaluation makes it difficult to develop general image quality metrics. Quality evaluation includes several mental processes and ignoring these processes and the use of a few test images can lead to biased results. By using a qualitative/quantitative (Interpretation Based Quality, IBQ) methodology, we examined the process of pair-wise comparison in a setting, where the quality of the images printed by laser printer on different paper grades was evaluated. Test image consisted of a picture of a table covered with several objects. Three other images were also used, photographs of a woman, cityscape and countryside. In addition to the pair-wise comparisons, observers (N=10) were interviewed about the subjective quality attributes they used in making their quality decisions. An examination of the individual pair-wise comparisons revealed serious inconsistencies in observers' evaluations on the test image content, but not on other contexts. The qualitative analysis showed that this inconsistency was due to the observers' focus of attention. The lack of easily recognizable context in the test image may have contributed to this inconsistency. To obtain reliable knowledge of the effect of image context or attention on subjective image quality, a qualitative methodology is needed.

  5. Overview of planning process at FFTF [Fast Flux Test Facility

    International Nuclear Information System (INIS)

    Gadeken, A.D.

    1986-03-01

    The planning process at the Fast Flux Test Facility (FFTF) is controlled through a hierarchy of documents ranging from a ten-year strategic plan to a weekly schedule. Within the hierarchy are a Near-Term (three-year) Operating Plan, a Cycle (six-month) Plan, and an Outage/Operating Phase Schedule. Coordination of the planning process is accomplished by a dedicated preparation team that also provides an overview of the formal planning timetable which identifies key action items required to be completed before an outage/operating phase can begin

  6. Plutonium stabilization and handling quality assurance program plan

    International Nuclear Information System (INIS)

    Weiss, E.V.

    1998-01-01

    This Quality Assurance Program Plan (QAPP) identifies project quality assurance requirements for all contractors involved in the planning and execution of Hanford Site activities for design, procurement, construction, testing and inspection for Project W-460, Plutonium Stabilization and Handling. The project encompasses procurement and installation of a Stabilization and Packaging System (SPS) to oxidize and package for long term storage remaining plutonium-bearing special nuclear materials currently in inventory at the Plutonium Finishing Plant (PFP), and modification of vault equipment to allow storage of resulting packages of stabilized SNM

  7. Gas generation matrix depletion quality assurance project plan

    International Nuclear Information System (INIS)

    1998-01-01

    The Los Alamos National Laboratory (LANL) is to provide the necessary expertise, experience, equipment and instrumentation, and management structure to: Conduct the matrix depletion experiments using simulated waste for quantifying matrix depletion effects; and Conduct experiments on 60 cylinders containing simulated TRU waste to determine the effects of matrix depletion on gas generation for transportation. All work for the Gas Generation Matrix Depletion (GGMD) experiment is performed according to the quality objectives established in the test plan and under this Quality Assurance Project Plan (QAPjP)

  8. Statistical process control for radiotherapy quality assurance

    International Nuclear Information System (INIS)

    Pawlicki, Todd; Whitaker, Matthew; Boyer, Arthur L.

    2005-01-01

    Every quality assurance process uncovers random and systematic errors. These errors typically consist of many small random errors and a very few number of large errors that dominate the result. Quality assurance practices in radiotherapy do not adequately differentiate between these two sources of error. The ability to separate these types of errors would allow the dominant source(s) of error to be efficiently detected and addressed. In this work, statistical process control is applied to quality assurance in radiotherapy for the purpose of setting action thresholds that differentiate between random and systematic errors. The theoretical development and implementation of process behavior charts are described. We report on a pilot project is which these techniques are applied to daily output and flatness/symmetry quality assurance for a 10 MV photon beam in our department. This clinical case was followed over 52 days. As part of our investigation, we found that action thresholds set using process behavior charts were able to identify systematic changes in our daily quality assurance process. This is in contrast to action thresholds set using the standard deviation, which did not identify the same systematic changes in the process. The process behavior thresholds calculated from a subset of the data detected a 2% change in the process whereas with a standard deviation calculation, no change was detected. Medical physicists must make decisions on quality assurance data as it is acquired. Process behavior charts help decide when to take action and when to acquire more data before making a change in the process

  9. Quality plan for criticality safety calculations at Rocky Flats

    International Nuclear Information System (INIS)

    Pecora, D.

    1978-01-01

    The text of the plan is given, and some of the guidelines followed in writing it are discussed to aid others who may be faced with the same task. The plan is divided into four sections. The Introduction describes the general functions and purpose of the calculational program. The second section, Activities and Responsibilities, lists specific tasks and their purposes and assigns responsibility for performance. The third section references relevant documentation (e.g., ANSI standards), and the final section describes quality plans for specific functions

  10. AVLIS Production Plant Preliminary Quality Assurance Plan and Assessment

    International Nuclear Information System (INIS)

    1984-01-01

    This preliminary Quality Assurance Plan and Assessment establishes the Quality Assurance requirements for the AVLIS Production Plant Project. The Quality Assurance Plan defines the management approach, organization, interfaces, and controls that will be used in order to provide adequate confidence that the AVLIS Production Plant design, procurement, construction, fabrication, installation, start-up, and operation are accomplished within established goals and objectives. The Quality Assurance Program defined in this document includes a system for assessing those elements of the project whose failure would have a significant impact on safety, environment, schedule, cost, or overall plant objectives. As elements of the project are assessed, classifications are provided to establish and assure that special actions are defined which will eliminate or reduce the probability of occurrence or control the consequences of failure. 8 figures, 18 tables

  11. Quality Assurance Program description, Defense Waste Processing Facility (DWPF)

    International Nuclear Information System (INIS)

    Maslar, S.R.

    1992-01-01

    This document describes the Westinghouse Savannah River Company's (WSRC) Quality Assurance Program for Defense Waste Processing at the Savannah River Site (SRS). WSRC is the operating contractor for the US Department of Energy (DOE) at the SRS. The following objectives are achieved through developing and implementing the Quality Assurance Program: (1) Ensure that the attainment of quality (in accomplishing defense high-level waste processing objectives at the SRS) is at a level commensurate with the government's responsibility for protecting public health and safety, the environment, the public investment, and for efficiently and effectively using national resources. (2) Ensure that high-level waste from qualification and production activities conform to requirements defined by OCRWM. These activities include production processes, equipment, and services; and products that are planned, designed, procured, fabricated, installed, tested, operated, maintained, modified, or produced

  12. Processes for Quality Improvements in Radiation Oncology Clinical Trials

    International Nuclear Information System (INIS)

    FitzGerald, T.J.; Urie, Marcia; Ulin, Kenneth; Laurie, Fran; Yorty, Jeffrey C.; Hanusik, Richard; Kessel, Sandy; Jodoin, Maryann Bishop; Osagie, Gani; Cicchetti, M. Giulia; Pieters, Richard; McCarten, Kathleen; Rosen, Nancy

    2008-01-01

    Quality assurance in radiotherapy (RT) has been an integral aspect of cooperative group clinical trials since 1970. In early clinical trials, data acquisition was nonuniform and inconsistent and computational models for radiation dose calculation varied significantly. Process improvements developed for data acquisition, credentialing, and data management have provided the necessary infrastructure for uniform data. With continued improvement in the technology and delivery of RT, evaluation processes for target definition, RT planning, and execution undergo constant review. As we move to multimodality image-based definitions of target volumes for protocols, future clinical trials will require near real-time image analysis and feedback to field investigators. The ability of quality assurance centers to meet these real-time challenges with robust electronic interaction platforms for imaging acquisition, review, archiving, and quantitative review of volumetric RT plans will be the primary challenge for future successful clinical trials

  13. PLANNING THE IMPLEMENTATION OF QUALITY THROUGH STRATEGY FORMULATION AND CORPORATE GOVERNANCE

    Directory of Open Access Journals (Sweden)

    Nikola Stefanović

    2007-09-01

    Full Text Available Planning the implementation of quality is a complex process that depends on many different internal and external factors. Planning the implementation is defined by the capabilities of management to visualize the market position of the company and to evaluate the company's strengths, weaknesses, opportunities, and threats. Serving to the company's purposes, planning the implementation of quality must be integrated into the company's strategic objectives and then transferred to other parts of the organization utilizing the corporate governance system. Planning the implementation, as a part of strategy formulation, should be reflected in: 1 company's vision and mission development, 2 goals setting, 3 strategy development aimed at achieving goals, 4 implementation and execution of the strategy, and 4 monitoring, evaluation, control, and readjustment of the strategy. Finally, planning must account for all possible implementation barriers.

  14. An Operational Process for Workforce Planning

    National Research Council Canada - National Science Library

    Emmerichs, Robert

    2004-01-01

    .... This report describes a methodology, developed by RAND at the behest of the Deputy Assistant Secretary of Defense for Civilian Personnel Policy, for conducting workforce planning-a methodology...

  15. Evaluating the role of collaborative planning in BC's Parks and Protected Areas Management Planning process

    OpenAIRE

    Ronmark, Tracy

    2005-01-01

    BC's protected areas system has recently doubled in size as a result of land use planning across the province. Managing protected areas to meet many goals requires thoughtful planning that involves stakeholder participation and dispute resolution through the plan development and implementation stages. This research identifies the best practices for planning and evaluates protected areas management planning processes based on those criteria. Evaluative criteria were developed from a literature...

  16. MEASUREMENT OF QUALITY MANAGEMENT SYSTEM PERFORMANCE IN MEAT PROCESSING

    Directory of Open Access Journals (Sweden)

    Elena S. Voloshina

    2017-01-01

    Full Text Available Modern methods aimed to ensure the quality of foods require to implement and certify quality management systems in processing plants. In this case, to measure the effectiveness of existing QMS is often a very difficult task for the leadership due to the fragmentation of the measured metrics, or even lack thereof. This points to the relevance of the conducted research.The criteria for effectiveness assessment of the production process of meat processing plants with the use of scaling methods and Shewhart control charts are presented in the article. The authors developed and presented the formulae for the calculation of single indicators used for the further comprehensive assessment. The algorithm of statistical evaluation of the process controllability, which allows in an accessible form to estimate the statistical control of production processes and to organize statistical quality control in the development of quality management systems, is presented The proposed procedure is based on a process approach, the essence of which is the application of the Deming cycle: “Plan — Do — Check — Act”, which makes it easy to integrate it into any existing quality management system.

  17. Planning successful change incorporating processes and people.

    Science.gov (United States)

    Hewitt-Taylor, Jaqui

    Implementing change is a core element of developing healthcare practice. While planning the practical aspects of change is vital, so too is considering how people will perceive and be affected by an innovation, including what individuals and teams will gain or lose, who the opinion leaders will be and the influence of workplace culture. The aim of this article is to highlight some of the considerations that may be useful in planning successful change.

  18. An integrated approach to hospital strategic planning, quality assurance, and continuous quality improvement.

    Science.gov (United States)

    Day, G; Gardner, S; Herba, C

    1995-01-01

    Like many other healthcare organizations today, the authors' facility, a 306-bed acute care community hospital in Michigan, strives to visualize and make a transition from traditional quality assurance to continuous quality improvement. The Juran Trilogy provided the insight that strategic planning, measurement, and continuous improvement must exist side by side. At the authors' facility, this realization resulted in the hospital quality plan, which treats each of these components as part of the foundation for quality. The authors explain this model and the reporting and communication mechanisms that support it.

  19. The Individualized Quality Control Plan - Coming Soon to Clinical Microbiology Laboratories Everywhere!

    Science.gov (United States)

    Anderson, Nancy

    2015-11-15

    As of January 1, 2016, microbiology laboratories can choose to adopt a new quality control option, the Individualized Quality Control Plan (IQCP), under the Clinical Laboratory Improvement Amendments of 1988 (CLIA). This voluntary approach increases flexibility for meeting regulatory requirements and provides laboratories the opportunity to customize QC for their testing in their unique environments and by their testing personnel. IQCP is an all-inclusive approach to quality based on risk management to address potential errors in the total testing process. It includes three main steps, (1) performing a risk assessment, (2) developing a QC plan, and (3) monitoring the plan through quality assessment. Resources are available from the Centers for Medicare & Medicaid Services, Centers for Disease Control and Prevention, American Society for Microbiology, Clinical and Laboratory Standards Institute, and accrediting organizations, such as the College of American Pathologists and Joint Commission, to assist microbiology laboratories implementing IQCP.

  20. Impact of Dynamics of Planned Change on Employees Quality of ...

    African Journals Online (AJOL)

    In this study, we determined the impact of organizational planned change programmes on the quality of worklife (QWL) of employees. The study involved four organizations selected from both the private and public sector establishments in Port Harcourt. Two organizations were randomly selected from each sector.

  1. A deterministic aggregate production planning model considering quality of products

    International Nuclear Information System (INIS)

    Madadi, Najmeh; Wong, Kuan Yew

    2013-01-01

    Aggregate Production Planning (APP) is a medium-term planning which is concerned with the lowest-cost method of production planning to meet customers' requirements and to satisfy fluctuating demand over a planning time horizon. APP problem has been studied widely since it was introduced and formulated in 1950s. However, in several conducted studies in the APP area, most of the researchers have concentrated on some common objectives such as minimization of cost, fluctuation in the number of workers, and inventory level. Specifically, maintaining quality at the desirable level as an objective while minimizing cost has not been considered in previous studies. In this study, an attempt has been made to develop a multi-objective mixed integer linear programming model that serves those companies aiming to incur the minimum level of operational cost while maintaining quality at an acceptable level. In order to obtain the solution to the multi-objective model, the Fuzzy Goal Programming approach and max-min operator of Bellman-Zadeh were applied to the model. At the final step, IBM ILOG CPLEX Optimization Studio software was used to obtain the experimental results based on the data collected from an automotive parts manufacturing company. The results show that incorporating quality in the model imposes some costs, however a trade-off should be done between the cost resulting from producing products with higher quality and the cost that the firm may incur due to customer dissatisfaction and sale losses.

  2. Sequence Coding and Search System Backfit Quality Assurance Program Plan

    International Nuclear Information System (INIS)

    Lovell, C.J.; Stepina, P.L.

    1985-03-01

    The Sequence Coding and Search System is a computer-based encoding system for events described in Licensee Event Reports. This data system contains LERs from 1981 to present. Backfit of the data system to include LERs prior to 1981 is required. This report documents the Quality Assurance Program Plan that EG and G Idaho, Inc. will follow while encoding 1980 LERs

  3. Quality Assurance Plans under the Renewable Fuel Standard Program

    Science.gov (United States)

    Quality Assurance Plan or (QAP) is a voluntary program where independent third-parties may audit and verify that RINs have been properly generated and are valid for compliance purposes. RINs verified under a QAP may be purchased by regulated parties.

  4. POSTER FOR NRMRL QUALITY MANAGEMENT PLAN (QMP) TRAINING COURSE

    Science.gov (United States)

    NRMRL QMP Training CourseContact: Lauren Drees, NRMRL/STD (drees.lauren@epa.gov) NRMRL has developed a computer-based course to train personnel in the requirements of the NRMRL Quality Management Plan (QMP). This training course was developed using Trainersoft s...

  5. Near-Facility Environmental Monitoring Quality Assurance Project Plan

    International Nuclear Information System (INIS)

    MCKINNEY, S.M.

    2000-01-01

    This Quality Assurance Project Plan addresses the quality assurance requirements for the activities associated with the preoperational and near-facility environmental monitoring directed by Waste Management Technical Services and supersedes HNF-EP-0538-4. This plan applies to all sampling and monitoring activities performed by Waste Management Technical Services in implementing near-facility environmental monitoring at the Hanford Site. This Quality Assurance Project Plan is required by U.S. Department of Energy Order 5400.1 (DOE 1990) as a part of the Environmental Monitoring Plan (DOE-RL 1997) and is used to define: Environmental measurement and sampling locations used to monitor environmental contaminants near active and inactive facilities and waste storage and disposal sites; Procedures and equipment needed to perform the measurement and sampling; Frequency and analyses required for each measurement and sampling location; Minimum detection level and accuracy; Quality assurance components; and Investigation levels. Near-facility environmental monitoring for the Hanford Site is conducted in accordance with the requirements of U.S. Department of Energy Orders 5400.1 (DOE 1990), 5400.5 (DOE 1993), 5484.1 (DOE 1990), and 435.1 (DOE 1999), and DOE/EH-O173T (DOE 1991). It is Waste Management Technical Services' objective to manage and conduct near-facility environmental monitoring activities at the Hanford Site in a cost-effective and environmentally responsible manner that is in compliance with the letter and spirit of these regulations and other environmental regulations, statutes, and standards

  6. Assessment report for Hanford analytical services quality assurance plan

    International Nuclear Information System (INIS)

    Taylor, L.H.

    1994-11-01

    This report documents the assessment results of DOE/RL-94-55, Hanford Analytical Services Quality Assurance Plan. The assessment was conducted using the Requirement and Self-Assessment Database (RSAD), which contains mandatory and nonmandatory DOE Order statements for the relevant DOE orders

  7. Quantity and quality of written feedback, action plans, and student ...

    African Journals Online (AJOL)

    Background. Mini-clinical-evaluation exercise (mini-CEX) assessment forms that have been modified with the addition of specific spaces on separate sheets are expected to improve the quantity and quality of written feedback and the action plan for further learning which is agreed upon, and to encourage written reflection.

  8. Surface quality in rapid prototype MMD process

    Directory of Open Access Journals (Sweden)

    Lisandro Vargas Henríquez

    2004-09-01

    Full Text Available This article summarises a Manufacturing Materials and Processes MSc thesis written for the Mechanical and Electrical Engineering Department. The paper shows the interaction of process, gap (deposition distance and extursion terminal velocity modelled process parameters for CEIF's (Centro de Equipos Interfacultades rapid prototype molten material deposit (MMD Titan SH-1 machine by analysing prototupes improved surface quality and resistence to tension and characterising material. The project applies experimental design criteria for orientating the selection of experimental process parameters. Acrylonitrile-buttadin-styrene (ABS had alredy been mechanically and physicochemically characterised (i.e the material used in the MMD process.

  9. Quality Assurance Plan, N springs expedited response action

    International Nuclear Information System (INIS)

    Jackson, G.J.

    1994-01-01

    This document is the Quality Assurance Plan (QAP) to be followed during the definitive design, construction, and operational phases for activities associated with the N Springs Expedited Response Action (ERA) for the 100-NR-2 Operable Unit (OU). Westinghouse Hanford Company (WHC) will comply with the US Department of Energy (DOE) Order 5700.6C, Quality Assurance (DOE 1989), and the US Environmental Protection Agency (EPA), EPA/530-SW-86-031, Technical Guidance Document: Construction Quality Assurance for Hazardous Waste Land Disposal Facilities (EPA 1986)

  10. 44 CFR 78.9 - Planning grant approval process.

    Science.gov (United States)

    2010-10-01

    ..., DEPARTMENT OF HOMELAND SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD MITIGATION ASSISTANCE § 78.9 Planning grant approval process. The State POC will evaluate and approve applications for Planning Grants. Funds will be provided only for the flood portion of any mitigation plan, and...

  11. Nevada Nuclear Waste Storage Investigations: Quality Assurance Plan

    International Nuclear Information System (INIS)

    1980-08-01

    The Nevada Nuclear Waste Storage Investigations (NNWSI) were established by DOE/NV to evaluate the geohydrologic setting and underground rock masses of the Nevada Test Site (NTS) and contiguous areas to determine whether a suitable site exists for constructing a repository for isolating highly radioactive solid wastes. Since the results of these evaluations will impact possible risks to public health and safety, a quality assurance program which conforms to the criteria given in the Code of Federal Regulations is needed to control the quality aspects of the work. This Quality Assurance Plan (QAP) describes the general quality assurance program for the overall NNWSI project under which the quality assurance programs of the individual participating organizations and support contractors are to operate. The details of how each of these groups will meet the criteria will differ among participating organizations and support contractors, and those details are given in the QAPP's listed in Appendix A. It is the purpose of this plan to show the commonality of quality assurance programs in effect within the project and to define how each element fits into the entire picture to give total quality assurance coverage for the NNWSI Project

  12. Review of quality assessment tools for family planning programmes in low- and middle-income countries.

    Science.gov (United States)

    Sprockett, Andrea

    2017-03-01

    Measuring and tracking the quality of healthcare is a critical part of improving service delivery, clinic efficiency and health outcomes. However, no standardized or widely accepted tool exists to assess the quality of clinic-based family planning services in low- and middle-income countries. The objective of this literature review was to identify widely used public domain quality assessment tools with existing or potential application in clinic-based family planning programmes. Using PubMed, PopLine, Google Scholar and Google, key terms such as ‘quality assessment tool’, ‘quality assessment method’, ‘quality measurement’, ‘LMIC’, ‘developing country’, ‘family planning’ and ‘reproductive health’ were searched for articles, identifying 20 relevant tools. Tools were assessed to determine the type of quality components assessed, divided into structure and process components, level of application (national or facility), health service domain that can be assessed by the tool, cost and current use of the tool. Tools were also assessed for shortcomings based on application in a low- and middle-income clinic-based family planning programme, including personnel required, re-assessment frequency, assessment of structure, process and outcome quality, comparability of data over time and across facilities and ability to benchmark clinic results to a national benchmark. No tools met all criteria, indicating a critical gap in quality assessment for low- and middle-income family planning programmes. To achieve Universal Health Coverage, agreed on in the Sustainable Development Goals and to improve system-wide healthcare quality, we must develop and widely adopt a standardized quality assessment tool.

  13. Waste Management Project Quality Assurance Program Plan (QAPP)

    International Nuclear Information System (INIS)

    HORHOTA, M.J.

    2000-01-01

    The Waste Management Project (WMP) is committed to excellence in our work and to delivering quality products and services to our customers, protecting our employees and the public and to being good stewards of the environment. We will continually strive to understand customer requirements, perform services, and activities that meet or exceed customer expectations, and be cost-effective in our performance. The WMP maintains an environment that fosters continuous improvement in our processes, performance, safety and quality. The achievement of quality will require the total commitment of all WMP employees to our ethic that Quality, Health and Safety, and Regulatory Compliance must come before profits. The successful implementation of this policy and ethic requires a formal, documented management quality system to ensure quality standards are established and achieved in all activities. The following principles are the foundation of our quality system. Senior management will take full ownership of the quality system and will create an environment that ensures quality objectives are met, standards are clearly established, and performance is measured and evaluated. Line management will be responsible for quality system implementation. Each organization will adhere to all quality system requirements that apply to their function. Every employee will be responsible for their work quality, to work safely and for complying with the policies, procedures and instructions applicable to their activities. Quality will be addressed and verified during all phases of our work scope from proposal development through closeout including contracts or projects. Continuous quality improvement will be an ongoing process. Our quality ethic and these quality principles constantly guide our actions. We will meet our own quality expectations and exceed those of our customers with vigilance, commitment, teamwork, and persistence

  14. Quality Assurance Program Plan (QAPP) Waste Management Project

    Energy Technology Data Exchange (ETDEWEB)

    HORHOTA, M.J.

    2000-12-21

    The Waste Management Project (WMP) is committed to excellence in our work and to delivering quality products and services to our customers, protecting our employees and the public and to being good stewards of the environment. We will continually strive to understand customer requirements, perform services, and activities that meet or exceed customer expectations, and be cost-effective in our performance. The WMP maintains an environment that fosters continuous improvement in our processes, performance, safety and quality. The achievement of quality will require the total commitment of all WMP employees to our ethic that Quality, Health and Safety, and Regulatory Compliance must come before profits. The successful implementation of this policy and ethic requires a formal, documented management quality system to ensure quality standards are established and achieved in all activities. The following principles are the foundation of our quality system. Senior management will take full ownership of the quality system and will create an environment that ensures quality objectives are met, standards are clearly established, and performance is measured and evaluated. Line management will be responsible for quality system implementation. Each organization will adhere to all quality system requirements that apply to their function. Every employee will be responsible for their work quality, to work safely and for complying with the policies, procedures and instructions applicable to their activities. Quality will be addressed and verified during all phases of our work scope from proposal development through closeout including contracts or projects. Continuous quality improvement will be an ongoing process. Our quality ethic and these quality principles constantly guide our actions. We will meet our own quality expectations and exceed those of our customers with vigilance, commitment, teamwork, and persistence.

  15. Mixed Waste Integrated Program Quality Assurance requirements plan

    International Nuclear Information System (INIS)

    1994-01-01

    Mixed Waste Integrated Program (MWIP) is sponsored by the US Department of Energy (DOE), Office of Technology Development, Waste Management Division. The strategic objectives of MWIP are defined in the Mixed Waste Integrated Program Strategic Plan, and expanded upon in the MWIP Program Management Plan. This MWIP Quality Assurance Requirement Plan (QARP) applies to mixed waste treatment technologies involving both hazardous and radioactive constituents. As a DOE organization, MWIP is required to develop, implement, and maintain a written Quality Assurance Program in accordance with DOE Order 4700.1 Project Management System, DOE Order 5700.6C, Quality Assurance, DOE Order 5820.2A Radioactive Waste Management, ASME NQA-1 Quality Assurance Program Requirements for Nuclear Facilities and ANSI/ASQC E4-19xx Specifications and Guidelines for Quality Systems for Environmental Data Collection and Environmental Technology Programs. The purpose of the MWIP QA program is to establish controls which address the requirements in 5700.6C, with the intent to minimize risks and potential environmental impacts; and to maximize environmental protection, health, safety, reliability, and performance in all program activities. QA program controls are established to assure that each participating organization conducts its activities in a manner consistent with risks posed by those activities

  16. Metro Vancouver air quality management plan : progress report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2008-10-15

    The Greater Vancouver Regional District (GVRD) developed an air quality management plan (AQMP) in 2005 as a means of addressing air quality issues in the region. The plan required progress reports every 2 years as well as a comprehensive review every 5 years. The AQMP established goals to minimize risk to public health from air pollution, improve visibility, and minimize the region's contributions to global climatic change by reducing emissions; implementing local air quality management programs; and enhancing air quality information and public awareness. The AQMP also included a sustainability framework for GVRD's policies and regulations related to regional growth, service delivery and political leadership. Regional strategies for solid waste and liquid waste management were developed in 2008. The sustainability framework has developed 3 priority goals: (1) to reduce diesel particulates by 75 per cent from Metro Vancouver corporate sources by 2012, (2) to be carbon neutral by 2012 excluding solid waste operations, and (3) to reduce regional GHGs by 15 per cent by 2015, and 33 per cent by 2020. Progress updates on regional planning efforts for the AQMP were presented. The report also outlined trends and performance measures used by the GVRD, and discussed changes in air quality issues and priorities that have occurred since the AQMP was adopted in 2005. 1 tab., 8 figs.

  17. The Groundwater Performance Assessment Project Quality Assurance Plan

    International Nuclear Information System (INIS)

    Luttrell, Stuart P.

    2006-01-01

    U.S. Department of Energy (DOE) has monitored groundwater on the Hanford Site since the 1940s to help determine what chemical and radiological contaminants have made their way into the groundwater. As regulatory requirements for monitoring increased in the 1980s, there began to be some overlap between various programs. DOE established the Groundwater Performance Assessment Project (groundwater project) in 1996 to ensure protection of the public and the environment while improving the efficiency of monitoring activities. The groundwater project is designed to support all groundwater monitoring needs at the site, eliminate redundant sampling and analysis, and establish a cost-effective hierarchy for groundwater monitoring activities. This document provides the quality assurance guidelines that will be followed by the groundwater project. This QA Plan is based on the QA requirements of DOE Order 414.1C, Quality Assurance, and 10 CFR 830, Subpart A--General Provisions/Quality Assurance Requirements as delineated in Pacific Northwest National Laboratory's Standards-Based Management System. In addition, the groundwater project is subject to the Environmental Protection Agency (EPA) Requirements for Quality Assurance Project Plans (EPA/240/B-01/003, QA/R-5). The groundwater project has determined that the Hanford Analytical Services Quality Assurance Requirements Documents (HASQARD, DOE/RL-96-68) apply to portions of this project and to the subcontractors. HASQARD requirements are discussed within applicable sections of this plan

  18. Metro Vancouver air quality management plan : progress report

    International Nuclear Information System (INIS)

    2008-10-01

    The Greater Vancouver Regional District (GVRD) developed an air quality management plan (AQMP) in 2005 as a means of addressing air quality issues in the region. The plan required progress reports every 2 years as well as a comprehensive review every 5 years. The AQMP established goals to minimize risk to public health from air pollution, improve visibility, and minimize the region's contributions to global climatic change by reducing emissions; implementing local air quality management programs; and enhancing air quality information and public awareness. The AQMP also included a sustainability framework for GVRD's policies and regulations related to regional growth, service delivery and political leadership. Regional strategies for solid waste and liquid waste management were developed in 2008. The sustainability framework has developed 3 priority goals: (1) to reduce diesel particulates by 75 per cent from Metro Vancouver corporate sources by 2012, (2) to be carbon neutral by 2012 excluding solid waste operations, and (3) to reduce regional GHGs by 15 per cent by 2015, and 33 per cent by 2020. Progress updates on regional planning efforts for the AQMP were presented. The report also outlined trends and performance measures used by the GVRD, and discussed changes in air quality issues and priorities that have occurred since the AQMP was adopted in 2005. 1 tab., 8 figs

  19. Mixed Waste Integrated Program Quality Assurance requirements plan

    Energy Technology Data Exchange (ETDEWEB)

    1994-04-15

    Mixed Waste Integrated Program (MWIP) is sponsored by the US Department of Energy (DOE), Office of Technology Development, Waste Management Division. The strategic objectives of MWIP are defined in the Mixed Waste Integrated Program Strategic Plan, and expanded upon in the MWIP Program Management Plan. This MWIP Quality Assurance Requirement Plan (QARP) applies to mixed waste treatment technologies involving both hazardous and radioactive constituents. As a DOE organization, MWIP is required to develop, implement, and maintain a written Quality Assurance Program in accordance with DOE Order 4700.1 Project Management System, DOE Order 5700.6C, Quality Assurance, DOE Order 5820.2A Radioactive Waste Management, ASME NQA-1 Quality Assurance Program Requirements for Nuclear Facilities and ANSI/ASQC E4-19xx Specifications and Guidelines for Quality Systems for Environmental Data Collection and Environmental Technology Programs. The purpose of the MWIP QA program is to establish controls which address the requirements in 5700.6C, with the intent to minimize risks and potential environmental impacts; and to maximize environmental protection, health, safety, reliability, and performance in all program activities. QA program controls are established to assure that each participating organization conducts its activities in a manner consistent with risks posed by those activities.

  20. 78 FR 59840 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Science.gov (United States)

    2013-09-30

    ...] Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management District... of plan. * * * * * (c) * * * (428) * * * (i) * * * (B) Antelope Valley Air Quality Management...) * * * (i) * * * (B) Antelope Valley Air Quality Management District. (1) Rule 431.1, ``Sulfur Content of...

  1. 76 FR 44535 - Revisions to the California State Implementation Plan, Northern Sierra Air Quality Management...

    Science.gov (United States)

    2011-07-26

    ... the California State Implementation Plan, Northern Sierra Air Quality Management District, Sacramento Metropolitan Air Quality Management District, and South Coast Air Quality Management District AGENCY... the Northern Sierra Air Quality Management District (NSAQMD), Sacramento Metropolitan Air Quality...

  2. Processing quality of NS soybean varieties

    Directory of Open Access Journals (Sweden)

    Đorđević Vuk

    2012-01-01

    Full Text Available Current NS soybean varieties are of satisfactory technological quality, and also significant technological diversity. Varieties Triumf and Venera possess higher oil content. Variety Sava has a balanced oil and protein content, and can be used for obtaining different soy products. Variety Rubin has the highest protein content and is suitable for new high protein products. Estimated processing value is a good parameter to describe the processing quality of soybeans. Based on several years and spatial analysis, it is possible to separate the geographic regions with prevailing favourable conditions for obtaining higher protein or oil content.

  3. Data management and processing plan, Department of Applied Geodesy

    International Nuclear Information System (INIS)

    1992-08-01

    This plan outlines Data Management and Data Processing requirements of the Department of Applied Geodesy (DAG) and presents the plan to meet these requirements (These requirements are derived from the functional needs of the Department to meet the SSCL alignment tolerances and schedules). In addition, this document presents a schedule for the implementation of this plan. This document is an integral part of the Alignment Plan of the SSCL

  4. Kennedy Space Center Orion Processing Team Planning for Ground Operations

    Science.gov (United States)

    Letchworth, Gary; Schlierf, Roland

    2011-01-01

    Topics in this presentation are: Constellation Ares I/Orion/Ground Ops Elements Orion Ground Operations Flow Orion Operations Planning Process and Toolset Overview, including: 1 Orion Concept of Operations by Phase 2 Ops Analysis Capabilities Overview 3 Operations Planning Evolution 4 Functional Flow Block Diagrams 5 Operations Timeline Development 6 Discrete Event Simulation (DES) Modeling 7 Ground Operations Planning Document Database (GOPDb) Using Operations Planning Tools for Operability Improvements includes: 1 Kaizen/Lean Events 2 Mockups 3 Human Factors Analysis

  5. Process monitoring using a quality and technical surveillance program

    International Nuclear Information System (INIS)

    Rafferty, C.A.

    1995-01-01

    The purpose of process monitoring using a quality and technical surveillance program was to help ensure that manufactured clad went sets fully met technical and quality requirements established by the manufacturer and the customer and that line and program management were immediately alerted if any aspect of the manufacturing activities drifted out of acceptable limits. The quality and technical surveillance program provided a planned, scheduled approach to monitor key processes and documentation and certification systems to prevent noncompliances or any manufacturing discrepancies. These surveillances illuminated potential problem areas early enough to permit timely corrective actions to reverse negative trends that, if left uncorrected, could have resulted in deficient hardware. Significant schedule and cost impacts were eliminated. copyright 1995 American Institute of Physics

  6. Improving energy audit process and report outcomes through planning initiatives

    Science.gov (United States)

    Sprau Coulter, Tabitha L.

    Energy audits and energy models are an important aspect of the retrofit design process, as they provide project teams with an opportunity to evaluate a facilities current building systems' and energy performance. The information collected during an energy audit is typically used to develop an energy model and an energy audit report that are both used to assist in making decisions about the design and implementation of energy conservation measures in a facility. The current lack of energy auditing standards results in a high degree of variability in energy audit outcomes depending on the individual performing the audit. The research presented is based on the conviction that performing an energy audit and producing a value adding energy model for retrofit buildings can benefit from a revised approach. The research was divided into four phases, with the initial three phases consisting of: 1.) process mapping activity - aimed at reducing variability in the energy auditing and energy modeling process. 2.) survey analysis -- To examine the misalignment between how industry members use the top energy modeling tools compared to their intended use as defined by software representatives. 3.) sensitivity analysis -- analysis of the affect key energy modeling inputs are having on energy modeling analysis results. The initial three phases helped define the need for an improved energy audit approach that better aligns data collection with facility owners' needs and priorities. The initial three phases also assisted in the development of a multi-criteria decision support tool that incorporates a House of Quality approach to guide a pre-audit planning activity. For the fourth and final research phase explored the impacts and evaluation methods of a pre-audit planning activity using two comparative energy audits as case studies. In each case, an energy audit professionals was asked to complete an audit using their traditional methods along with an audit which involved them first

  7. The Soils and Groundwater – EM-20 S&T Roadmap Quality Assurance Project Plan

    Energy Technology Data Exchange (ETDEWEB)

    Fix, N. J.

    2008-02-11

    The Soils and Groundwater – EM-20 Science and Technology Roadmap Project is a U.S. Department of Energy, Office of Environmental Management-funded initiative designed to develop new methods, strategies and technology for characterizing, modeling, remediating, and monitoring soils and groundwater contaminated with metals, radionuclides, and chlorinated organics. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by EM-20 Roadmap Project staff.

  8. SU-D-BRD-03: Improving Plan Quality with Automation of Treatment Plan Checks

    International Nuclear Information System (INIS)

    Covington, E; Younge, K; Chen, X; Lee, C; Matuszak, M; Kessler, M; Acosta, E; Orow, A; Filpansick, S; Moran, J; Keranen, W

    2015-01-01

    Purpose: To evaluate the effectiveness of an automated plan check tool to improve first-time plan quality as well as standardize and document performance of physics plan checks. Methods: The Plan Checker Tool (PCT) uses the Eclipse Scripting API to check and compare data from the treatment planning system (TPS) and treatment management system (TMS). PCT was created to improve first-time plan quality, reduce patient delays, increase efficiency of our electronic workflow, and to standardize and partially automate plan checks in the TPS. A framework was developed which can be configured with different reference values and types of checks. One example is the prescribed dose check where PCT flags the user when the planned dose and the prescribed dose disagree. PCT includes a comprehensive checklist of automated and manual checks that are documented when performed by the user. A PDF report is created and automatically uploaded into the TMS. Prior to and during PCT development, errors caught during plan checks and also patient delays were tracked in order to prioritize which checks should be automated. The most common and significant errors were determined. Results: Nineteen of 33 checklist items were automated with data extracted with the PCT. These include checks for prescription, reference point and machine scheduling errors which are three of the top six causes of patient delays related to physics and dosimetry. Since the clinical roll-out, no delays have been due to errors that are automatically flagged by the PCT. Development continues to automate the remaining checks. Conclusion: With PCT, 57% of the physics plan checklist has been partially or fully automated. Treatment delays have declined since release of the PCT for clinical use. By tracking delays and errors, we have been able to measure the effectiveness of automating checks and are using this information to prioritize future development. This project was supported in part by P01CA059827

  9. SU-D-BRD-03: Improving Plan Quality with Automation of Treatment Plan Checks

    Energy Technology Data Exchange (ETDEWEB)

    Covington, E; Younge, K; Chen, X; Lee, C; Matuszak, M; Kessler, M; Acosta, E; Orow, A; Filpansick, S; Moran, J [University of Michigan Hospital and Health System, Ann Arbor, MI (United States); Keranen, W [Varian Medical Systems, Palo Alto, CA (United States)

    2015-06-15

    Purpose: To evaluate the effectiveness of an automated plan check tool to improve first-time plan quality as well as standardize and document performance of physics plan checks. Methods: The Plan Checker Tool (PCT) uses the Eclipse Scripting API to check and compare data from the treatment planning system (TPS) and treatment management system (TMS). PCT was created to improve first-time plan quality, reduce patient delays, increase efficiency of our electronic workflow, and to standardize and partially automate plan checks in the TPS. A framework was developed which can be configured with different reference values and types of checks. One example is the prescribed dose check where PCT flags the user when the planned dose and the prescribed dose disagree. PCT includes a comprehensive checklist of automated and manual checks that are documented when performed by the user. A PDF report is created and automatically uploaded into the TMS. Prior to and during PCT development, errors caught during plan checks and also patient delays were tracked in order to prioritize which checks should be automated. The most common and significant errors were determined. Results: Nineteen of 33 checklist items were automated with data extracted with the PCT. These include checks for prescription, reference point and machine scheduling errors which are three of the top six causes of patient delays related to physics and dosimetry. Since the clinical roll-out, no delays have been due to errors that are automatically flagged by the PCT. Development continues to automate the remaining checks. Conclusion: With PCT, 57% of the physics plan checklist has been partially or fully automated. Treatment delays have declined since release of the PCT for clinical use. By tracking delays and errors, we have been able to measure the effectiveness of automating checks and are using this information to prioritize future development. This project was supported in part by P01CA059827.

  10. 77 FR 58955 - Approval and Promulgation of Air Quality Implementation Plans; Commonwealth of Pennsylvania...

    Science.gov (United States)

    2012-09-25

    ... than 100 HP or gas extraction wells at landfills. However, the Commenter has not provided, and EPA is... processing of natural gas from the Marcellus Shale'' and asserts that these alleged monitoring or reporting... Marcellus Shale industry and therefore the ambient air quality monitoring plan is inadequate to monitor...

  11. 75 FR 31711 - Approval and Promulgation of Air Quality Implementation Plans; Delaware; Control of Nitrogen...

    Science.gov (United States)

    2010-06-04

    ... Promulgation of Air Quality Implementation Plans; Delaware; Control of Nitrogen Oxide Emissions From Industrial... controlling nitrogen oxide (NOx) emissions from industrial boilers. This action is being taken under the Clean...--Control of Nitrogen Oxide Emissions from Industrial Boilers and Process Heaters at Petroleum Refineries in...

  12. 75 FR 32858 - Approval and Promulgation of Air Quality Implementation Plans; Delaware; Control of Nitrogen...

    Science.gov (United States)

    2010-06-10

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R03-OAR-2010-0039; FRL-9158-3] Approval and Promulgation of Air Quality Implementation Plans; Delaware; Control of Nitrogen Oxide Emissions From Industrial Boilers and Process Heaters at Petroleum Refineries Correction In rule document 2010-13377 beginning on...

  13. 77 FR 34297 - Approval and Promulgation of Air Quality Implementation Plans; Pennsylvania; Pittsburgh-Beaver...

    Science.gov (United States)

    2012-06-11

    ... Promulgation of Air Quality Implementation Plans; Pennsylvania; Pittsburgh-Beaver Valley Nonattainment Area... Pittsburgh-Beaver Valley fine particulate matter (PM 2.5 ) nonattainment area (hereafter referred to as ``the... designations process. The Pittsburgh Area is comprised of the counties of Beaver, Butler, Washington, and...

  14. 2015 Plan. Project 1: methodology and planning process of the Brazilian electric sector expansion

    International Nuclear Information System (INIS)

    1993-10-01

    The Planning Process of Brazilian Electric Sector Expansion, their normative aspects, instruments, main agents and the planning cycles are described. The methodology of expansion planning is shown, with the interactions of several study areas, electric power market and the used computer models. The forecasts of methodology evolution is also presented. (C.G.C.)

  15. Linking the Teacher Appraisal Process to the School Improvement Plan

    Science.gov (United States)

    Reddekopp, Therese

    2007-01-01

    If a school improvement plan includes input from all stakeholders and focuses on data-driven processes that are linked to teacher appraisal, it can be powerful in leading the school toward the common mission of achieving student success. Linking the school improvement plan to the teacher appraisal process creates a system whereby all individuals…

  16. Quality assurance management plan (QAPP) special analytical support (SAS)

    Energy Technology Data Exchange (ETDEWEB)

    LOCKREM, L.L.

    1999-05-20

    It is the policy of Special Analytical Support (SAS) that the analytical aspects of all environmental data generated and processed in the laboratory, subject to the Environmental Protection Agency (EPA), U.S. Department of Energy or other project specific requirements, be of known and acceptable quality. It is the intention of this QAPP to establish and assure that an effective quality controlled management system is maintained in order to meet the quality requirements of the intended use(s) of the data.

  17. Quality assurance management plan (QAPP) special analytical support (SAS)

    International Nuclear Information System (INIS)

    LOCKREM, L.L.

    1999-01-01

    It is the policy of Special Analytical Support (SAS) that the analytical aspects of all environmental data generated and processed in the laboratory, subject to the Environmental Protection Agency (EPA), U.S. Department of Energy or other project specific requirements, be of known and acceptable quality. It is the intention of this QAPP to establish and assure that an effective quality controlled management system is maintained in order to meet the quality requirements of the intended use(s) of the data

  18. Implementation of a Web-Based Collaborative Process Planning System

    Science.gov (United States)

    Wang, Huifen; Liu, Tingting; Qiao, Li; Huang, Shuangxi

    Under the networked manufacturing environment, all phases of product manufacturing involving design, process planning, machining and assembling may be accomplished collaboratively by different enterprises, even different manufacturing stages of the same part may be finished collaboratively by different enterprises. Based on the self-developed networked manufacturing platform eCWS(e-Cooperative Work System), a multi-agent-based system framework for collaborative process planning is proposed. In accordance with requirements of collaborative process planning, share resources provided by cooperative enterprises in the course of collaboration are classified into seven classes. Then a reconfigurable and extendable resource object model is built. Decision-making strategy is also studied in this paper. Finally a collaborative process planning system e-CAPP is developed and applied. It provides strong support for distributed designers to collaboratively plan and optimize product process though network.

  19. The Effect of Modeling Qualities, Tones and Gages in Ceramic Supply Chains' Master Planning

    Directory of Open Access Journals (Sweden)

    Isabel MUNDI

    2012-01-01

    Full Text Available Ceramic production processes are characterized by providing quantities of the same finished goods that differ in qualities, tones and gages. This aspect becomes a problem for ceramic supply chains (SCs that should promise and serve customer orders with homogeneous quantities of the same finished good. In this paper a mathematical programming model for the cen-tralized master planning of ceramic SC is proposed. Inputs to the master plan include demand forecasts in terms of customer order classes based on their order size and splitting percentages of a lot into homogeneous sub-lots. Then, the master plan defines the size and loading of lots to production lines and their distribution with the aim of maximizing the number of customer orders fulfilled with homogeneous quantities in the most efficient manner for the SC. Finally, the effect of modeling qualities, tones and gages in master planning is assessed.

  20. Analysing contemporary metropolitan spatial plans in Europe through their institutional context, instrumental content and planning process

    DEFF Research Database (Denmark)

    Elinbaum, Pablo; Galland, Daniel

    2016-01-01

    This article sets out to propose and apply a qualitative framework for thinking about how to analyze and compare metropolitan spatial plans in a milieu of divergent spatial planning traditions and discretionary planning practices. In doing so, the article reviews and develops an understanding...... concerning the institutional context, instrumental content and planning processes associated with four contemporary metropolitan spatial plans in Europe, namely London, Copenhagen, Paris and Barcelona. Through the results of a multiple case study and a subsequent cross comparative analysis, the article...... stresses that contemporary metropolitan spatial plans tend to merge characteristics associated with project-based and strategy-based spatial plans, thus contrasting with the typical land-use character of municipal plans and the often strategic, growth-oriented pursuit of regional plans in Europe...

  1. Patient with stroke: hospital discharge planning, functionality and quality of life

    Directory of Open Access Journals (Sweden)

    Henrique José Mendes Nunes

    Full Text Available ABSTRACT Stroke still causes high levels of human inability and suffering, and it is one of the main causes of death in developed countries, including Portugal. Objective: analyze the strategies of hospital discharge planning for these patients, increasing the knowledge related to hospitalhome transition, discharge planning processes and the main impact on the quality of life and functionality. Method: integrative literature review using the PICOD criteria, with database research. Results: 19 articles were obtained, using several approaches and contexts. For quality of life, the factors related to the patient satisfaction with care and the psychoemotional aspects linked with functionality are the most significant. Conclusion: during the hospitalization period, a careful hospital discharge planning and comprehensive care to patients and caregivers - in particular the functional and psychoemotional aspects - tend to have an impact on the quality of life of patients.

  2. Hanford analytical services quality assurance plan. Revision 1

    International Nuclear Information System (INIS)

    1995-02-01

    This document, the Hanford Analytical Services Quality Assurance Plan (HASQAP), is issued by the U.S. Department of Energy, Richland Operations Office (RL). The HASQAP establishes quality requirements in response to U.S. Department of Energy (DOE) Order 5700.6C, Quality Assurance (10 CFR 830.120, open-quotes Quality Assurance Requirementsclose quotes). The HASQAP is designed to meet the needs of the RL for controlling the of analytical chemistry services provided by laboratory operations. The HASQAP is issued through the Analytical Services Branch of the Waste Management Division. The Analytical Services Branch is designated by the RL as having the responsibility for oversight management of laboratory operations under the Waste Management Division. The laboratories conduct sample analyses under several regulatory statutes, such as the Clean Air Act and the Clean Water Act. Sample analysis in support of the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) is a major role of the laboratory operations

  3. SU-F-P-64: The Impact of Plan Complexity Parameters On the Plan Quality and Deliverability of Volumetric Modulated Arc Therapy with Canonical Correlation Analysis

    Energy Technology Data Exchange (ETDEWEB)

    Jin, X; Yi, J; Xie, C [The 1st Affiliated Hospital of Wenzhou Medical University, Wenzhou, Zhejiang (China)

    2016-06-15

    Purpose: To evaluate the impact of complexity indices on the plan quality and deliverability of volumetric modulated arc therapy (VMAT), and to determine the most significant parameters in the generation of an ideal VMAT plan. Methods: A multi-dimensional exploratory statistical method, canonical correlation analysis (CCA) was adopted to study the correlations between VMAT parameters of complexity, quality and deliverability, as well as their contribution weights with 32 two-arc VMAT nasopharyngeal cancer (NPC) patients and 31 one-arc VMAT prostate cancer patients. Results: The MU per arc (MU/Arc) and MU per control point (MU/CP) of NPC were 337.8±25.2 and 3.7±0.3, respectively, which were significantly lower than those of prostate cancer patients (MU/Arc : 506.9±95.4, MU/CP : 5.6±1.1). The plan complexity indices indicated that two-arc VMAT plans were more complex than one-arc VMAT plans. Plan quality comparison confirmed that one-arc VMAT plans had a high quality than two-arc VMAT plans. CCA results implied that plan complexity parameters were highly correlated with plan quality with the first two canonical correlations of 0.96, 0.88 (both p<0.001) and significantly correlated with deliverability with the first canonical correlation of 0.79 (p<0.001), plan quality and deliverability was also correlated with the first canonical correlation of 0.71 (p=0.02). Complexity parameters of MU/CP, segment area (SA) per CP, percent of MU/CP less 3 and planning target volume (PTV) were weighted heavily in correlation with plan quality and deliveability . Similar results obtained from individual NPC and prostate CCA analysis. Conclusion: Relationship between complexity, quality, and deliverability parameters were investigated with CCA. MU, SA related parameters and PTV volume were found to have strong effect on the plan quality and deliverability. The presented correlation among different quantified parameters could be used to improve the plan quality and the efficiency

  4. A plan quality classifier derived with overlap-wall-histogram of hollow organs for automatic IMRT plan quality control of prostate cancer cases

    Directory of Open Access Journals (Sweden)

    Ting Song

    2014-03-01

    Full Text Available Purpose: We developed a plan quality classification model to assess IMRT plan quality of prostate cancer patients for automatic plan quality control. Methods: For hollow organs such as rectum and bladder, dose-wall-histogram (DWH was used to evaluate OAR dose sparing in our institution. Correspondingly, we proposed a new descriptor called overlap-wall-histogram (OWH to describe the complex spatial relationship between PTV and a hollow organ. Two metrics calculated from the OWH and DWH are introduced to quantitatively evaluate the difficulty of patient geometry for planning and plan quality in terms of OAR sparing, respectively. A linear correlation between these two metrics was observed after plotting plan quality metric as a function of geometry difficulty metric studied from a database of prostate cases treated in our institution with acceptable plan quality. Thus, a fitting line was built acting as the boundary of high quality and poor quality plans. A query plan falling above the boundary is assessed as high quality, vice versa poor quality. Results: 15 prostate IMRT plans were used to test our model. One was identified as poor quality and the others were common-level. After re-planning all plans, the dose constraints for bladder wall W75 (percentage of wall receiving more than 75Gy, W70, W65 and W60 can be reduced by 3.34%, 3%, 6.99%, 6.54% for that poor quality plan and 1.11%, 0.95%, 1.45% and 1.81% averagely for the common-level quality group, without sacrificing PTV coverage and rectum dose sparing. Conclusion: An effective model was built to provide automatic IMRT plan quality control by evaluating hollow OAR dose sparing for prostate cancer patients. Furthermore, for the query plan with poor quality, potential improvement of plan quality can be estimated and a good reference plan with similar or harder geometry can be automatically chosen from our database to help guide the re-planning if necessary.---------------------------Cite this

  5. A Total Quality-Control Plan with Right-Sized Statistical Quality-Control.

    Science.gov (United States)

    Westgard, James O

    2017-03-01

    A new Clinical Laboratory Improvement Amendments option for risk-based quality-control (QC) plans became effective in January, 2016. Called an Individualized QC Plan, this option requires the laboratory to perform a risk assessment, develop a QC plan, and implement a QC program to monitor ongoing performance of the QC plan. Difficulties in performing a risk assessment may limit validity of an Individualized QC Plan. A better alternative is to develop a Total QC Plan including a right-sized statistical QC procedure to detect medically important errors. Westgard Sigma Rules provides a simple way to select the right control rules and the right number of control measurements. Copyright © 2016 Elsevier Inc. All rights reserved.

  6. UMTRA technical assistance contractor quality assurance program plan

    International Nuclear Information System (INIS)

    1994-10-01

    This Quality Assurance Program Plan (QAPP) provides the primary requirements for the integration of quality functions into all Technical Assistance Contractor (TAC) Project organization activities. The QAPP is the written directive authorized by the TAc Program Manager to accomplish this task and to implement procedures that provide the controls and sound management practices needed to ensure TAC contractual obligations are met. The QA program is designed to use monitoring, audit, and surveillance functions as management tools to ensure that all Project organization functions are executed in a manner that will protect public health and safety, promote the success of the Project, and meet or exceed contract requirements

  7. 200 Area Liquid Effluent Facilities -- Quality assurance program plan

    International Nuclear Information System (INIS)

    Fernandez, L.

    1995-01-01

    This Quality Assurance Program Plan (QAPP) describes the quality assurance and management controls used by the 200 Area Liquid Effluent Facilities (LEF) to perform its activities in accordance with DOE Order 5700.6C. The 200 Area LEF consists of the following facilities: Effluent Treatment Facility (ETF); Treated Effluent Disposal Facility (TEDF); Liquid Effluent Retention facility (LERF); and Truck Loading Facility -- (Project W291). The intent is to ensure that all activities such as collection of effluents, treatment, concentration of secondary wastes, verification, sampling and disposal of treated effluents and solids related with the LEF operations, conform to established requirements

  8. Analytic network process (ANP approach for product mix planning in railway industry

    Directory of Open Access Journals (Sweden)

    Hadi Pazoki Toroudi

    2016-08-01

    Full Text Available Given the competitive environment in the global market in recent years, organizations need to plan for increased profitability and optimize their performance. Planning for an appropriate product mix plays essential role for the success of most production units. This paper applies analytical network process (ANP approach for product mix planning for a part supplier in Iran. The proposed method uses four criteria including cost of production, sales figures, supply of raw materials and quality of products. In addition, the study proposes different set of products as alternatives for production planning. The preliminary results have indicated that that the proposed study of this paper could increase productivity, significantly.

  9. TWRS process engineering data management plan

    Energy Technology Data Exchange (ETDEWEB)

    Adams, M.R.

    1997-05-12

    The Tank Characterization Data Management (TCDM) system provides customers and users with data and information of known and acceptable quality when they are needed, in the form they are needed, and at a reasonable cost. The TCDM mission will be accomplished by the following: (1) maintaining and managing tank characterization data and information based on business needs and objectives including transfer of ownership to future contractors; (2) capturing data where it originates and entering it only once to control data consistency, electronic data and information management shall be emphasized to the extent practicable; (3) establishing data quality standards, and managing and certifying databases and data sources against these standards to maintain the proper level of data and information quality consistent with the importance of the data and information, data obtained at high cost with significant implications to decision making regarding tank safety and/or disposal will be maintained and managed at the highest necessary levels of quality; (4) establishing and enforcing data management standards for the Tank Characterization Database (TCD) and supporting data sources including providing mechanisms for discovering and correcting data errors before they propagate; (5) emphasizing electronic data sharing with all authorized users, customers, contractors, and stakeholders to the extent practicable; (6) safeguarding data and information from unauthorized alteration or destruction; (7) providing standards for electronic information deliverables to subcontractors and vendors to achieve uniformity in electronic data management; and (8) investing in new technology (hardware and/or software) as prudent and necessary to accomplish the mission in an efficient and effective manner.

  10. Plutonium Oxide Process Capability Work Plan

    Energy Technology Data Exchange (ETDEWEB)

    Meier, David E. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Tingey, Joel M. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2014-02-28

    Pacific Northwest National Laboratory (PNNL) has been tasked to develop a Pilot-scale Plutonium-oxide Processing Unit (P3U) providing a flexible capability to produce 200g (Pu basis) samples of plutonium oxide using different chemical processes for use in identifying and validating nuclear forensics signatures associated with plutonium production. Materials produced can also be used as exercise and reference materials.

  11. Software quality assurance plan for void fraction instrument

    International Nuclear Information System (INIS)

    Gimera, M.

    1994-01-01

    Waste Tank SY-101 has been the focus of extensive characterization work over the past few years. The waste continually generates gases, most notably hydrogen, which are periodically released from the waste. Gas can be trapped in tank waste in three forms: as void gas (bubbles), dissolved gas, or absorbed gas. Void fraction is the volume percentage of a given sample that is comprised of void gas. The void fraction instrument (VFI) acquires the data necessary to calculate void fraction. This document covers the product, Void Fraction Data Acquisition Software. The void fraction software being developed will have the ability to control the void fraction instrument hardware and acquire data necessary to calculate the void fraction in samples. This document provides the software quality assurance plan, verification and validation plan, and configuration management plan for developing the software for the instrumentation that will be used to obtain void fraction data from Tank SY-101

  12. Effect of beamlet step-size on IMRT plan quality

    International Nuclear Information System (INIS)

    Zhang Guowei; Jiang Ziping; Shepard, David; Earl, Matt; Yu, Cedric

    2005-01-01

    We have studied the degree to which beamlet step-size impacts the quality of intensity modulated radiation therapy (IMRT) treatment plans. Treatment planning for IMRT begins with the application of a grid that divides each beam's-eye-view of the target into a number of smaller beamlets (pencil beams) of radiation. The total dose is computed as a weighted sum of the dose delivered by the individual beamlets. The width of each beamlet is set to match the width of the corresponding leaf of the multileaf collimator (MLC). The length of each beamlet (beamlet step-size) is parallel to the direction of leaf travel. The beamlet step-size represents the minimum stepping distance of the leaves of the MLC and is typically predetermined by the treatment planning system. This selection imposes an artificial constraint because the leaves of the MLC and the jaws can both move continuously. Removing the constraint can potentially improve the IMRT plan quality. In this study, the optimized results were achieved using an aperture-based inverse planning technique called direct aperture optimization (DAO). We have tested the relationship between pencil beam step-size and plan quality using the American College of Radiology's IMRT test case. For this case, a series of IMRT treatment plans were produced using beamlet step-sizes of 1, 2, 5, and 10 mm. Continuous improvements were seen with each reduction in beamlet step size. The maximum dose to the planning target volume (PTV) was reduced from 134.7% to 121.5% and the mean dose to the organ at risk (OAR) was reduced from 38.5% to 28.2% as the beamlet step-size was reduced from 10 to 1 mm. The smaller pencil beam sizes also led to steeper dose gradients at the junction between the target and the critical structure with gradients of 6.0, 7.6, 8.7, and 9.1 dose%/mm achieved for beamlet step sizes of 10, 5, 2, and 1 mm, respectively

  13. Current status of quality assurance of treatment planning systems

    International Nuclear Information System (INIS)

    Mijnheer, B.J.

    1997-01-01

    A review is given of the current status of quality assurance of treatment planning systems. At this moment only one comprehensive report is available. In order to review national activities a questionnaire has been distributed amongst national societies of medical physicists. From the 23 responding countries, 8 indicated that only limited efforts are underway, 8 answered that a working group is evaluating their specific national requirements while in 5 countries a document is drafted. The highlights of these reports have been summarized. (author)

  14. Strategic planning processes and financial performance among hospitals in Lebanon.

    Science.gov (United States)

    Saleh, Shadi; Kaissi, Amer; Semaan, Adele; Natafgi, Nabil Maher

    2013-01-01

    Strategic planning has been presented as a valuable management tool. However, evidence of its deployment in healthcare and its effect on organizational performance is limited in low-income and middle-income countries (LMICs). The study aimed to explore the use of strategic planning processes in Lebanese hospitals and to investigate its association with financial performance. The study comprised 79 hospitals and assessed occupancy rate (OR) and revenue-per-bed (RPB) as performance measures. The strategic planning process included six domains: having a plan, plan development, plan implementation, responsibility of planning activities, governing board involvement, and physicians' involvement. Approximately 90% of hospitals have strategic plans that are moderately developed (mean score of 4.9 on a 1-7 scale) and implemented (score of 4.8). In 46% of the hospitals, the CEO has the responsibility for the plan. The level of governing board involvement in the process is moderate to high (score of 5.1), whereas physician involvement is lower (score of 4.1). The OR and RPB amounted to respectively 70% and 59 304 among hospitals with a strategic plan as compared with 62% and 33 564 for those lacking such a plan. No statistical association between having a strategic plan and either of the two measures was detected. However, the findings revealed that among hospitals that had a strategic plan, higher implementation levels were associated with lower OR (p plans allow organizations to better cope with environmental turbulence. Copyright © 2012 John Wiley & Sons, Ltd.

  15. The impact of curricula and lesson planning in the teaching process

    Directory of Open Access Journals (Sweden)

    Majlinda Lika

    2017-03-01

    Full Text Available Lesson planning is at the core of teaching. It allows teachers to create an orientation path in the process of teaching, taking into consideration, many elements such as, students’ styles of learning, previous knowledge, types of intelligences, interests etc. Effective curricula plans are characterized by principles of coherence, flexibility, integration of knowledge etc. Effective lesson plans strongly rely on previous information gathered through different forms of assessment, and provide inclusive opportunities for every student. This paper will show how planning affects teaching and the quality of learning. First, a review of the literature will represent the importance of flexible planning and incorporation of differentiated elements of planning that ensure inclusive opportunities of learning for all students. Second, there will be a detailed analysis of findings taken by 25 full school inspections practices on the field of “lesson planning”. This part of the study will specify the planning difficulties the teachers face and how this affects the process of teaching and learning. Third, benefits of lesson plans that rely on good assessment practices and integrate differentiated instruction according to students' needs will be discussed as ways of helping teachers adjust lesson plans to overcome their planning difficulties. Findings indicate that teachers design lesson plans that do not rely on good assessment practices. Lesson plans are not flexible enough to respond and satisfy the needs of all categories of students, impacting that way the quality of instruction and learning. The paper will serve teachers to review their planning approaches and integrate elements of differentiated instruction as an organic part of the process, responding to traits and uniqueness students represent.

  16. Planning for quality? Assessing the role of quality of place in current Dutch planning practice

    NARCIS (Netherlands)

    Kloosterman, R.C.; Trip, J.J.

    2011-01-01

    In recent years, an attractive urban environment has increasingly been recognized as a factor of local competitiveness in a globalizing world. Notably, Richard Florida and Charles Landry have stressed the importance of the concept of quality of place. The implications of their often criticized, but

  17. 'Race', disadvantage, and policy processes in British planning

    OpenAIRE

    H Thomas; V Krishnarayan

    1994-01-01

    In this paper some of the mechanisms by which black and ethnic minorities can be put at a particular disadvantage within the planning system in Britain (and how these processes can be challenged) are examined. A number of types of policy processes operating in British planning are identified, and, drawing on a range of secondary and primary data, the influence of black and ethnic minorities within these processes are analysed. The paper is concluded with a review of the possibilities for the ...

  18. Processing DOD Thrift Savings Plan Contributions

    National Research Council Canada - National Science Library

    Lane, F

    1996-01-01

    .... This part of our audit focused on the processing of individual contributions to the TSP at two DFAS payroll offices at the DFAS Columbus Center, Columbus, Ohio, and Bolling Air Force Base (AFB), Washington, D.C...

  19. Large hadron collider (LHC) project quality assurance plan

    Energy Technology Data Exchange (ETDEWEB)

    Gullo, Lisa; Karpenko, Victor; Robinson, Kem; Turner, William; Wong, Otis

    2002-09-30

    The LHC Quality Assurance Plan is a set of operating principles, requirements, and practices used to support Berkeley Lab's participation in the Large Hadron Collider Project. The LHC/QAP is intended to achieve reliable, safe, and quality performance in the LHC project activities. The LHC/QAP is also designed to fulfill the following objectives: (1) The LHC/QAP is Berkeley Lab's QA program document that describes the elements necessary to integrate quality assurance, safety management, and conduct of operations into the Berkeley Lab's portion of the LHC operations. (2) The LHC/QAP provides the framework for Berkeley Lab LHC Project administrators, managers, supervisors, and staff to plan, manage, perform, and assess their Laboratory work. (3) The LHC/QAP is the compliance document that conforms to the requirements of the Laboratory's Work Smart Standards for quality assurance (DOE O 414.1, 10 CFR 830.120), facility operations (DOE O 5480.19), and safety management (DOE P 450.4).

  20. UMTRA project technical assistance contractor quality assurance implementation plan

    International Nuclear Information System (INIS)

    1994-03-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Technical Assistance contractor (TAC) Quality Assurance Implementation Plan (QAIP) outlines the primary requirements for integrating quality functions for TAC technical activities applied to the surface and ground water phases of the UMTRA Project. The QAIP is subordinate to the latest issue of the UMTRA Project TAC Quality Assurance Program Plan (QAPP) (DOE, 1993a), which was developed using US Department of Energy (DOE) Order 5700.6C quality assurance (QA) criteria. The QAIP addresses technical aspects of the TAC UMTRA Project surface and ground water programs. All QA issues in the QAIP shall comply with requirements contained in the TAC QAPP (DOE, 1933a). Because industry standards for data acquisition and data control are not addressed in DOE Order 5700.6C, the QAIP has been formatted to the 14 US Environmental Protection Agency (EPA) Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) QA requirements. DOE Order 5700.6C criteria that are not contained in the CERCLA requirements are added to the QAIP as additional requirements in Sections 15.0 through 18.0. Project documents that contain CERCLA requirements and 5700.6 criteria shall be referenced in this document to avoid duplication. Referenced documents are not included in this QAIP but are available through the UMTRA Project Document Control Center

  1. Large hadron collider (LHC) project quality assurance plan

    International Nuclear Information System (INIS)

    Gullo, Lisa; Karpenko, Victor; Robinson, Kem; Turner, William; Wong, Otis

    2002-01-01

    The LHC Quality Assurance Plan is a set of operating principles, requirements, and practices used to support Berkeley Lab's participation in the Large Hadron Collider Project. The LHC/QAP is intended to achieve reliable, safe, and quality performance in the LHC project activities. The LHC/QAP is also designed to fulfill the following objectives: (1) The LHC/QAP is Berkeley Lab's QA program document that describes the elements necessary to integrate quality assurance, safety management, and conduct of operations into the Berkeley Lab's portion of the LHC operations. (2) The LHC/QAP provides the framework for Berkeley Lab LHC Project administrators, managers, supervisors, and staff to plan, manage, perform, and assess their Laboratory work. (3) The LHC/QAP is the compliance document that conforms to the requirements of the Laboratory's Work Smart Standards for quality assurance (DOE O 414.1, 10 CFR 830.120), facility operations (DOE O 5480.19), and safety management (DOE P 450.4)

  2. Planning for quality stewardship: The sitewide environmental impact statement

    International Nuclear Information System (INIS)

    Webb, D.

    1995-01-01

    The U.S Department of Energy is responsible for managing many large tracts of Federal land throughout this country. These sites host the nation's nuclear weapons complex, national laboratories, environmental restoration facilities, and serve other uses. The Department faces unique problems in administering this land. Many have multiple activities taking place at the same time; for example, a site may simultaneously be used for energy research, technology development, waste disposal and wildlife habitat. The sites often use radioactive and other hazardous materials and many are contaminated as a result of past management practices. In 1992 the Department institutes a policy, as stated in its National Environmental Policy Act regulations [10 CFR 1021], to prepare sitewide environmental impact statements for its large, multipurpose sites. For the first time, through the sitewide environmental impact statement process, the Department has an effective tool to plan for quality stewardship of the lands and resources entrusted to its care. The sitewide environmental impact statement is a specialized type of programmatic environmental impact statement which allows the Department to look at the geographically connected actions taking place at a given site. The sitewide statement allows a comprehensive look at the operational baseline for the entire site to determine the total cumulative impact of ongoing operations at the site. The Department can identify areas where a change in management practices would mitigate undesirable impacts; areas not at issue could continue under existing practices. As a result, an environmentally-sound operating envelope can be established. This, in turn, can serve in the future as a threshold to decide if new proposals would result in significant impacts to the site as a whole, to simplify future National Environmental Policy Act reviews

  3. Total quality management in a 300-bed community hospital: the quality improvement process translated to health care.

    Science.gov (United States)

    Hughes, J M

    1992-09-01

    Winter Park Memorial Hospital (Winter Park, Florida) began implementation of a well-strategized plan for total quality management (TQM) in 1987. Having no guidelines for applying TQM to health care but using the industrial quality management techniques of Philip Crosby Associates, Inc, the hospital made the transition and saved thousands of dollars in the process. This article describes the transition, especially the integral part played by the Medical Staff Quality Council in changing the hospital's culture.

  4. Quality-assurance and data-management plan for water-quality activities in the Kansas Water Science Center, 2014

    Science.gov (United States)

    Rasmussen, Teresa J.; Bennett, Trudy J.; Foster, Guy M.; Graham, Jennifer L.; Putnam, James E.

    2014-01-01

    As the Nation’s largest water, earth, and biological science and civilian mapping information agency, the U.S. Geological Survey is relied on to collect high-quality data, and produce factual and impartial interpretive reports. This quality-assurance and data-management plan provides guidance for water-quality activities conducted by the Kansas Water Science Center. Policies and procedures are documented for activities related to planning, collecting, storing, documenting, tracking, verifying, approving, archiving, and disseminating water-quality data. The policies and procedures described in this plan complement quality-assurance plans for continuous water-quality monitoring, surface-water, and groundwater activities in Kansas.

  5. 77 FR 12495 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Science.gov (United States)

    2012-03-01

    ... the California State Implementation Plan, Antelope Valley Air Quality Management District and Mojave Desert Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Direct final... Quality Management District (AVAQMD) and Mojave Desert Air Quality Management District (MDAQMD) portion of...

  6. 76 FR 44493 - Revisions to the California State Implementation Plan, Northern Sierra Air Quality Management...

    Science.gov (United States)

    2011-07-26

    ... California State Implementation Plan, Northern Sierra Air Quality Management District, Sacramento Metropolitan Air Quality Management District, and South Coast Air Quality Management District AGENCY... approve revisions to the Northern Sierra Air Quality Management District (NSAQMD), Sacramento Metropolitan...

  7. 78 FR 21540 - Revisions to the California State Implementation Plan, Butte County Air Quality Management...

    Science.gov (United States)

    2013-04-11

    ... the California State Implementation Plan, Butte County Air Quality Management District and Sacramento Metropolitan Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Direct... Quality Management District (BCAQMD) and Sacramento Metropolitan Air Quality Management District (SMAQMD...

  8. 75 FR 40726 - Revisions to the California State Implementation Plan, Sacramento Metropolitan Air Quality...

    Science.gov (United States)

    2010-07-14

    ... the California State Implementation Plan, Sacramento Metropolitan Air Quality Management District and South Coast Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION... Metropolitan Air Quality Management District (SMAQMD) and South Coast Air Quality Management District (SCAQMD...

  9. NATO Defence Planning Process. Implications for defence posture

    Directory of Open Access Journals (Sweden)

    Paweł Fleischer

    2015-12-01

    Full Text Available The NATO Defence Planning Process (NDPP is the most important element affecting the Alliance's defence posture. Under the process states commit themselves to provide capabilities and forces required to fulfil NATO missions, defined in the NATO Strategic Concept. The NDPP directly affects national defence plans by harmonizing them with identified security and defence objectives as well by influencing development of the novel national defence capabilities. The emergence of new threats in the NATO environment, demands modifications in the defense planning process and establishing new goals for the Alliance. Enhancement of the NDPP should be priority during the time of unrest.

  10. Fuel quality processing study, volume 1

    Science.gov (United States)

    Ohara, J. B.; Bela, A.; Jentz, N. E.; Syverson, H. T.; Klumpe, H. W.; Kessler, R. E.; Kotzot, H. T.; Loran, B. L.

    1981-01-01

    A fuel quality processing study to provide a data base for an intelligent tradeoff between advanced turbine technology and liquid fuel quality, and also, to guide the development of specifications of future synthetic fuels anticipated for use in the time period 1985 to 2000 is given. Four technical performance tests are discussed: on-site pretreating, existing refineries to upgrade fuels, new refineries to upgrade fuels, and data evaluation. The base case refinery is a modern Midwest refinery processing 200,000 BPD of a 60/40 domestic/import petroleum crude mix. The synthetic crudes used for upgrading to marketable products and turbine fuel are shale oil and coal liquids. Of these syncrudes, 50,000 BPD are processed in the existing petroleum refinery, requiring additional process units and reducing petroleum feed, and in a new refinery designed for processing each syncrude to produce gasoline, distillate fuels, resid fuels, and turbine fuel, JPGs and coke. An extensive collection of synfuel properties and upgrading data was prepared for the application of a linear program model to investigate the most economical production slate meeting petroleum product specifications and turbine fuels of various quality grades. Technical and economic projections were developed for 36 scenarios, based on 4 different crude feeds to either modified existing or new refineries operated in 2 different modes to produce 7 differing grades of turbine fuels. A required product selling price of turbine fuel for each processing route was calculated. Procedures and projected economics were developed for on-site treatment of turbine fuel to meet limitations of impurities and emission of pollutants.

  11. WE-DE-201-02: A Statistical Analysis Tool for Plan Quality Verification in HDR Brachytherapy Forward Planning for Cervix Cancer

    Energy Technology Data Exchange (ETDEWEB)

    Ma, R; Zhu, X; Li, S; Zheng, D; Lei, Y; Wang, S; Verma, V; Bennion, N; Wahl, A; Zhou, S [University of Nebraska Medical Center, Omaha, NE (United States)

    2016-06-15

    Purpose: High Dose Rate (HDR) brachytherapy forward planning is principally an iterative process; hence, plan quality is affected by planners’ experiences and limited planning time. Thus, this may lead to sporadic errors and inconsistencies in planning. A statistical tool based on previous approved clinical treatment plans would help to maintain the consistency of planning quality and improve the efficiency of second checking. Methods: An independent dose calculation tool was developed from commercial software. Thirty-three previously approved cervical HDR plans with the same prescription dose (550cGy), applicator type, and treatment protocol were examined, and ICRU defined reference point doses (bladder, vaginal mucosa, rectum, and points A/B) along with dwell times were collected. Dose calculation tool then calculated appropriate range with a 95% confidence interval for each parameter obtained, which would be used as the benchmark for evaluation of those parameters in future HDR treatment plans. Model quality was verified using five randomly selected approved plans from the same dataset. Results: Dose variations appears to be larger at the reference point of bladder and mucosa as compared with rectum. Most reference point doses from verification plans fell between the predicted range, except the doses of two points of rectum and two points of reference position A (owing to rectal anatomical variations & clinical adjustment in prescription points, respectively). Similar results were obtained for tandem and ring dwell times despite relatively larger uncertainties. Conclusion: This statistical tool provides an insight into clinically acceptable range of cervical HDR plans, which could be useful in plan checking and identifying potential planning errors, thus improving the consistency of plan quality.

  12. Classification of risks in the process of financial planning

    Directory of Open Access Journals (Sweden)

    A.V. Overchuk

    2017-12-01

    Full Text Available The essence of the concept «risk» in the process of financial planning is studied. The classification of risks was conducted. The article provides the full enough and detailed system of classification of risks in the process of financial planning. The author researches and provides the factors, which directly influence upon the size of risks, which accompany the process of financial planning. A complete set of isolated independent features was determined for each risk type. It was found out that a part of features depends only on the risk type and the other part is determined by the character of a risky situation. The article substantiates the presence of indeterminacy typical for dynamic and non-stationary environment and the risks of different nature and strength of influence on the efficiency of financial planning, which cause the necessity to develop and implement the effective system of financial planning at an enterprise.

  13. Service Quality and Process Maturity Assessment

    Directory of Open Access Journals (Sweden)

    Serek Radomir

    2013-12-01

    Full Text Available This article deals with service quality and the methods for its measurement and improvements to reach the so called service excellence. Besides older methods such as SERVQUAL and SERPERF, there are also shortly described capability maturity models based on which the own methodology is developed and used for process maturity assessment in organizations providing technical services. This method is equally described and accompanied by examples on pictures. The verification of method functionality is explored on finding a correlation between service employee satisfaction and average process maturity in a service organization. The results seem to be quite promising and open an arena for further studies.

  14. UMTRA technical assistance contractor Quality Assurance Program Plan

    International Nuclear Information System (INIS)

    Pehrson, P.

    1993-01-01

    This Quality Assurance Program Plan (QAPP) provides the primary requirements for the integration of quality functions into all Technical Assistance Contractor (TAC) Project organization activities. The QAPP is the written directive authorized by the TAC Program Manager to accomplish this task and to implement procedures that provide the controls and sound management practices needed to ensure TAC contractual obligations are met. The QA program is designed to use monitoring, audit, and surveillance functions as management tools to ensure that all Project organization functions are executed in a manner that will protect public health and safety, promote the success of the Project, and meet or exceed contract requirements. The key to ensuring compliance with this directive is a two-step professional approach: utilize the quality system in all areas of activity, and generate a personal commitment from all personnel to provide quality service. The quality staff will be experienced, trained professionals capable of providing maximum flexibility to Project goal attainment. Such flexibility will enable the staff to be more cost effective and to further improve communication and coordination. To provide control details, this QAPP will be supplemented by approved standard operating procedures that provide requirements for performing the various TAC quality-related activities. These procedures shall describe applicable design input and document control activities and documentation

  15. Goal planning: a retrospective audit of rehabilitation process and outcome.

    Science.gov (United States)

    Duff, Jane; Evans, Matthew J; Kennedy, Paul

    2004-05-01

    To consider the effectiveness of a goal planning programme for people with spinal cord injury (SCI) and address some of the current evidence gaps in goal setting. Retrospective audit. Consecutive series of 65 newly injured SCI patients. The Needs Assessment Checklist (NAC) has been specifically developed for the SCI population, and is used to assess patient attainment in core rehabilitation areas. A 'Goal Planning Progress' form was also used to specifically detail the goal planning process. Across the 65 patients, 396 goal planning meetings were held with 6176 goals set in total. Seventy-two per cent of the goals set at the first goal planning meeting were achieved by the second meeting. The rate of achievement at subsequent meetings was 68%. Significant differences in the number of planned rehabilitation days, number of goal planning meetings, and goals set were identified between injury categories. Significant positive correlations were found between the number of goals set and achievement, as measured by the NAC, in certain rehabilitation domains. The findings of this study demonstrate that the Needs Assessment and Goal Planning framework is effective in planning SCI rehabilitation. The capacity of this goal planning system to reflect individual need has also been established. Further systematic analyses of this process could potentially lead to more efficient rehabilitation and the identification of care pathways within clinical areas.

  16. Safeguards planning in a plant design process

    International Nuclear Information System (INIS)

    Heinrich, L.A.

    1977-01-01

    The safeguards efforts for the partitioning fuel cycle are considered. Included in the discussion are the organization of the safeguards study, the development of safeguards criteria, the expression of these criteria as requirements for facility design, and some preliminary details of the implementation of these requirements in facility and process layout

  17. Quality-assurance plan for groundwater activities, U.S. Geological Survey, Washington Water Science Center

    Science.gov (United States)

    Kozar, Mark D.; Kahle, Sue C.

    2013-01-01

    This report documents the standard procedures, policies, and field methods used by the U.S. Geological Survey’s (USGS) Washington Water Science Center staff for activities related to the collection, processing, analysis, storage, and publication of groundwater data. This groundwater quality-assurance plan changes through time to accommodate new methods and requirements developed by the Washington Water Science Center and the USGS Office of Groundwater. The plan is based largely on requirements and guidelines provided by the USGS Office of Groundwater, or the USGS Water Mission Area. Regular updates to this plan represent an integral part of the quality-assurance process. Because numerous policy memoranda have been issued by the Office of Groundwater since the previous groundwater quality assurance plan was written, this report is a substantial revision of the previous report, supplants it, and contains significant additional policies not covered in the previous report. This updated plan includes information related to the organization and responsibilities of USGS Washington Water Science Center staff, training, safety, project proposal development, project review procedures, data collection activities, data processing activities, report review procedures, and archiving of field data and interpretative information pertaining to groundwater flow models, borehole aquifer tests, and aquifer tests. Important updates from the previous groundwater quality assurance plan include: (1) procedures for documenting and archiving of groundwater flow models; (2) revisions to procedures and policies for the creation of sites in the Groundwater Site Inventory database; (3) adoption of new water-level forms to be used within the USGS Washington Water Science Center; (4) procedures for future creation of borehole geophysics, surface geophysics, and aquifer-test archives; and (5) use of the USGS Multi Optional Network Key Entry System software for entry of routine water-level data

  18. Linking Planning and Budgeting through Business Process Redesign.

    Science.gov (United States)

    Inman, Marianne E.

    In the wake of an extensive strategic planning process that refocused institutional values at Northland College, Wisconsin, the administration undertook linking the budget with the newly articulated plan. Incremental budgeting was no longer feasible, and the new budget would have to reflect streamlining and new ways of functioning. Consequently…

  19. 49 CFR 1106.4 - The Safety Integration Plan process.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 8 2010-10-01 2010-10-01 false The Safety Integration Plan process. 1106.4 Section 1106.4 Transportation Other Regulations Relating to Transportation (Continued) SURFACE... CONSIDERATION OF SAFETY INTEGRATION PLANS IN CASES INVOLVING RAILROAD CONSOLIDATIONS, MERGERS, AND ACQUISITIONS...

  20. A Strategic Planning Process Model for Distance Education

    Science.gov (United States)

    Pisel, Kenneth P.

    2008-01-01

    As more institutions seek to implement or expand distance learning programs, it becomes critical to integrate distance learning programs into broader strategic visions and plans. Using the informed opinion from a panel of peer-nominated experts via iterative Delphi questionnaires, a 10-phased strategic planning process model for distance education…

  1. 44 CFR 78.6 - Flood Mitigation Plan approval process.

    Science.gov (United States)

    2010-10-01

    ... 44 Emergency Management and Assistance 1 2010-10-01 2010-10-01 false Flood Mitigation Plan..., DEPARTMENT OF HOMELAND SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD MITIGATION ASSISTANCE § 78.6 Flood Mitigation Plan approval process. The State POC will forward all Flood...

  2. Audit of an automated checklist for quality control of radiotherapy treatment plans

    International Nuclear Information System (INIS)

    Breen, Stephen L.; Zhang Beibei

    2010-01-01

    Purpose: To assess the effect of adding an automated checklist to the treatment planning process for head and neck intensity-modulated radiotherapy. Methods: Plans produced within our treatment planning system were evaluated at the planners' discretion with an automated checklist of more than twenty planning parameters. Plans were rated as accepted or rejected for treatment, during regular review by radiation oncologists and physicists as part of our quality control program. The rates of errors and their types were characterised prior to the implementation of the checklist and with the checklist. Results: Without the checklist, 5.9% of plans were rejected; the use of the checklist reduced the rejection rate to 3.1%. The checklist was used for 64.7% of plans. Pareto analysis of the causes of rejection showed that the checklist reduced the number of causes of rejections from twelve to seven. Conclusions: The use of an automated checklist has reduced the need for reworking of treatment plans. With the use of the checklist, most rejections were due to errors in prescription or inadequate dose distributions. Use of the checklist by planners must be increased to maximise improvements in planning efficiency.

  3. Idaho Chemical Processing Plant Site Development Plan

    International Nuclear Information System (INIS)

    Ferguson, F.G.

    1994-02-01

    The Idaho Chemical Processing Plant (ICPP) mission is to receive and store spent nuclear fuels and radioactive wastes for disposition for Department of Energy (DOE) in a cost-effective manner that protects the safety of Idaho National Engineering Laboratory (INEL) employees, the public, and the environment by: Developing advanced technologies to process spent nuclear fuel for permanent offsite disposition and to achieve waste minimization. Receiving and storing Navy and other DOE assigned spent nuclear fuels. Managing all wastes in compliance with applicable laws and regulations. Identifying and conducting site remediation consistent with facility transition activities. Seeking out and implementing private sector technology transfer and cooperative development agreements. Prior to April 1992, the ICPP mission included fuel reprocessing. With the recent phaseout of fuel reprocessing, some parts of the ICPP mission have changed. Others have remained the same or increased in scope

  4. Constellation Mission Operation Working Group: ESMO Maneuver Planning Process Review

    Science.gov (United States)

    Moyer, Eric

    2015-01-01

    The Earth Science Mission Operation (ESMO) Project created an Independent Review Board to review our Conjunction Risk evaluation process and Maneuver Planning Process to identify improvements that safely manages mission conjunction risks, maintains ground track science requirements, and minimizes overall hours expended on High Interest Events (HIE). The Review Board is evaluating the current maneuver process which requires support by multiple groups. In the past year, there have been several changes to the processes although many prior and new concerns exist. This presentation will discuss maneuver process reviews and Board comments, ESMO assessment and path foward, ESMO future plans, recent changes and concerns.

  5. On Intelligent Design and Planning Method of Process Route Based on Gun Breech Machining Process

    Science.gov (United States)

    Hongzhi, Zhao; Jian, Zhang

    2018-03-01

    The paper states an approach of intelligent design and planning of process route based on gun breech machining process, against several problems, such as complex machining process of gun breech, tedious route design and long period of its traditional unmanageable process route. Based on gun breech machining process, intelligent design and planning system of process route are developed by virtue of DEST and VC++. The system includes two functional modules--process route intelligent design and its planning. The process route intelligent design module, through the analysis of gun breech machining process, summarizes breech process knowledge so as to complete the design of knowledge base and inference engine. And then gun breech process route intelligently output. On the basis of intelligent route design module, the final process route is made, edited and managed in the process route planning module.

  6. Quality Affordable Housing: A Theoretical Framework for Planning and Design of Quality Housing

    Directory of Open Access Journals (Sweden)

    Noor Sharipah Sultan Sidi

    2011-10-01

    Full Text Available The provision of adequate, good or quality housing for the population has always been a major challenge and task for most nations in the world particularly the developing countries. As such various measures have been undertaken towards this end. However, the major constraint or problem in this respect has always been in defining the criteria for quality housing and establishing the standards of quality housing particularly with respect to the parameters in the determination of quality as some of the parameters are subjective and contextual such as psychological, cultural and environmental aspects. This paper is aimed at discussing the concept of quality housing and establishing the parameters and theoretical framework which can be used by researchers, town planners, architects, policy makers and others in the formulation of criteria / guidelines for the planning and design of quality housing.

  7. Tank waste remediation system privatization phase I infrastructure, project W-519, Quality Assurance implementation plan

    International Nuclear Information System (INIS)

    HUSTON, J.J.

    1999-01-01

    This document has been prepared to identify the quality requirements for all products/activities developed by or for Project W-519. This plan is responsive to the Numatec Hanford Corporation, Quality Assurance Program Plan, NHC-MP-001

  8. Verification and Planning for Stochastic Processes with Asynchronous Events

    National Research Council Canada - National Science Library

    Younes, Hakan L

    2005-01-01

    .... The most common assumption is that of history-independence: the Markov assumption. In this thesis, the author considers the problems of verification and planning for stochastic processes with asynchronous events, without relying on the Markov assumption...

  9. Resource Planning for Massive Number of Process Instances

    Science.gov (United States)

    Xu, Jiajie; Liu, Chengfei; Zhao, Xiaohui

    Resource allocation has been recognised as an important topic for business process execution. In this paper, we focus on planning resources for a massive number of process instances to meet the process requirements and cater for rational utilisation of resources before execution. After a motivating example, we present a model for planning resources for process instances. Then we design a set of heuristic rules that take both optimised planning at build time and instance dependencies at run time into account. Based on these rules we propose two strategies, one is called holistic and the other is called batched, for resource planning. Both strategies target a lower cost, however, the holistic strategy can achieve an earlier deadline while the batched strategy aims at rational use of resources. We discuss how to find balance between them in the paper with a comprehensive experimental study on these two approaches.

  10. Statewide and Metropolitan Transportation Planning Processes : a TPCB Peer Exchange

    Science.gov (United States)

    2016-04-20

    This report highlights key recommendations and noteworthy practices identified at Statewide and Metropolitan Transportation Planning Processes Peer Exchange held on September 9-10, 2015 in Shepherdstown, West Virginia. This event was sponsored ...

  11. Systemic Operational Design: Enhancing the Joint Operation Planning Process

    National Research Council Canada - National Science Library

    Delacruz, Victor J

    2007-01-01

    Operational level commanders and their staffs require relevant and current joint doctrine that articulates the critical function of operational design and its role in the Joint Operation Planning Process (JOPP...

  12. Minimally processed vegetable salads: microbial quality evaluation.

    Science.gov (United States)

    Fröder, Hans; Martins, Cecília Geraldes; De Souza, Katia Leani Oliveira; Landgraf, Mariza; Franco, Bernadette D G M; Destro, Maria Teresa

    2007-05-01

    The increasing demand for fresh fruits and vegetables and for convenience foods is causing an expansion of the market share for minimally processed vegetables. Among the more common pathogenic microorganisms that can be transmitted to humans by these products are Listeria monocytogenes, Escherichia coli O157:H7, and Salmonella. The aim of this study was to evaluate the microbial quality of a selection of minimally processed vegetables. A total of 181 samples of minimally processed leafy salads were collected from retailers in the city of Sao Paulo, Brazil. Counts of total coliforms, fecal coliforms, Enterobacteriaceae, psychrotrophic microorganisms, and Salmonella were conducted for 133 samples. L. monocytogenes was assessed in 181 samples using the BAX System and by plating the enrichment broth onto Palcam and Oxford agars. Suspected Listeria colonies were submitted to classical biochemical tests. Populations of psychrotrophic microorganisms >10(6) CFU/g were found in 51% of the 133 samples, and Enterobacteriaceae populations between 10(5) and 106 CFU/g were found in 42% of the samples. Fecal coliform concentrations higher than 10(2) CFU/g (Brazilian standard) were found in 97 (73%) of the samples, and Salmonella was detected in 4 (3%) of the samples. Two of the Salmonella-positive samples had minimally processed vegetables had poor microbiological quality, and these products could be a vehicle for pathogens such as Salmonella and L. monocytogenes.

  13. The ends of uncertainty: Air quality science and planning in Central California

    Energy Technology Data Exchange (ETDEWEB)

    Fine, James [Univ. of California, San Francisco, CA (United States)

    2003-09-01

    Air quality planning in Central California is complicated and controversial despite millions of dollars invested to improve scientific understanding. This research describes and critiques the use of photochemical air quality simulation modeling studies in planning to attain standards for ground-level ozone in the San Francisco Bay Area and the San Joaquin Valley during the 1990's. Data are gathered through documents and interviews with planners, modelers, and policy-makers at public agencies and with representatives from the regulated and environmental communities. Interactions amongst organizations are diagramed to identify significant nodes of interaction. Dominant policy coalitions are described through narratives distinguished by their uses of and responses to uncertainty, their exposures to risks, and their responses to the principles of conservatism, civil duty, and caution. Policy narratives are delineated using aggregated respondent statements to describe and understand advocacy coalitions. I found that models impacted the planning process significantly, but were used not purely for their scientific capabilities. Modeling results provided justification for decisions based on other constraints and political considerations. Uncertainties were utilized opportunistically by stakeholders instead of managed explicitly. Ultimately, the process supported the partisan views of those in control of the modeling. Based on these findings, as well as a review of model uncertainty analysis capabilities, I recommend modifying the planning process to allow for the development and incorporation of uncertainty information, while addressing the need for inclusive and meaningful public participation. By documenting an actual air quality planning process these findings provide insights about the potential for using new scientific information and understanding to achieve environmental goals, most notably the analysis of uncertainties in modeling applications. Concurrently

  14. Instant noodles: processing, quality, and nutritional aspects.

    Science.gov (United States)

    Gulia, Neelam; Dhaka, Vandana; Khatkar, B S

    2014-01-01

    Noodles are one of the staple foods consumed in many Asian countries. Instant noodles have become internationally recognized food, and worldwide consumption is on the rise. The properties of instant noodles like taste, nutrition, convenience, safety, longer shelf-life, and reasonable price have made them popular. Quality factors important for instant noodles are color, flavor, and texture, cooking quality, rehydration rates during final preparation, and the presence or absence of rancid taste after extended storage. Microstructure of dough and noodles has been studied to understand the influence of ingredients and processing variables on the noodle quality by employing scanning electron microscopy. Applications of newer techniques like confocal laser scanning microscopy and epifluorescence light microscopy employed to understand the microstructure changes in dough and noodles have also been discussed. Sincere efforts of researchers are underway to improve the formulation, extend the shelf life, and promote universal fortification of instant noodles. Accordingly, many researchers are exploring the potential of noodle fortification as an effective public health intervention and improve its nutritional properties. This review focuses on the functionality of ingredients, unit operations involved, quality criteria for evaluation, recent trends in fortification, and current knowledge in relation to instant noodles.

  15. SU-E-T-43: A Methodology for Quality Control of IMPT Treatment Plan Based On VMAT Plan

    Energy Technology Data Exchange (ETDEWEB)

    Jiang, S [UT MD Anderson Cancer Center (United States); Tianjin Medical University Cancer Institute and Hospital (China); Yang, Y [UT MD Anderson Cancer Center (United States); Tianjin First Center Hospital (China); Liao, L; Wang, X; Li, H; Zhu, X; Zhang, X [UT MD Anderson Cancer Center (United States)

    2015-06-15

    Purpose: IMPT plan design is highly dependent on planner’s experiences. VMAT plan design is relatively mature and can even be automated. The quality of IMPT plan designed by in-experienced planner could be inferior to that of VMAT plan designed by experienced planner or automatic planning software. Here we introduce a method for designing IMPT plan based on VMAT plan to ensure the IMPT plan be superior to IMRT/VMAT plan for majority clinical scenario. Methods: To design a new IMPT plan, a VMAT plan is first generated either by experienced planner or by in-house developed automatic planning system. An in-house developed tool is used to generate the dose volume constrains for the IMPT plan as plan template to Eclipse TPS. The beam angles for IMPT plan are selected based on the preferred angles in the VMAT plan. IMPT plan is designed by importing the plan objectives generated from VMAT plan. Majority thoracic IMPT plans are designed using this plan approach in our center. In this work, a thoracic IMPT plan under RTOG 1308 protocol is selected to demonstrate the effectiveness and efficiency of this approach. The dosimetric indices of IMPT are compared with VMAT plan. Results: The PTV D95, lung V20, MLD, mean heart dose, esophagus D1, cord D1 are 70Gy, 31%, 17.8Gy, 25.5Gy, 73Gy, 45Gy for IMPT plan and 65.3Gy, 34%, 21.6Gy, 35Gy, 74Gy, 48Gy for VMAT plan. For majority cases, the high dose region of the normal tissue which is in proximity of PTV is comparable between IMPT and VMAT plan. The low dose region of the IMPT plan is significantly better than VMAT plan. Conclusion: Using the knowledge gained in VMAT plan design can help efficiently and effectively design high quality IMPT plan. The quality of IMPT plan can be controlled to ensure the superiority of IMPT plan compared to VMAT/IMRT plan.

  16. SU-E-T-43: A Methodology for Quality Control of IMPT Treatment Plan Based On VMAT Plan

    International Nuclear Information System (INIS)

    Jiang, S; Yang, Y; Liao, L; Wang, X; Li, H; Zhu, X; Zhang, X

    2015-01-01

    Purpose: IMPT plan design is highly dependent on planner’s experiences. VMAT plan design is relatively mature and can even be automated. The quality of IMPT plan designed by in-experienced planner could be inferior to that of VMAT plan designed by experienced planner or automatic planning software. Here we introduce a method for designing IMPT plan based on VMAT plan to ensure the IMPT plan be superior to IMRT/VMAT plan for majority clinical scenario. Methods: To design a new IMPT plan, a VMAT plan is first generated either by experienced planner or by in-house developed automatic planning system. An in-house developed tool is used to generate the dose volume constrains for the IMPT plan as plan template to Eclipse TPS. The beam angles for IMPT plan are selected based on the preferred angles in the VMAT plan. IMPT plan is designed by importing the plan objectives generated from VMAT plan. Majority thoracic IMPT plans are designed using this plan approach in our center. In this work, a thoracic IMPT plan under RTOG 1308 protocol is selected to demonstrate the effectiveness and efficiency of this approach. The dosimetric indices of IMPT are compared with VMAT plan. Results: The PTV D95, lung V20, MLD, mean heart dose, esophagus D1, cord D1 are 70Gy, 31%, 17.8Gy, 25.5Gy, 73Gy, 45Gy for IMPT plan and 65.3Gy, 34%, 21.6Gy, 35Gy, 74Gy, 48Gy for VMAT plan. For majority cases, the high dose region of the normal tissue which is in proximity of PTV is comparable between IMPT and VMAT plan. The low dose region of the IMPT plan is significantly better than VMAT plan. Conclusion: Using the knowledge gained in VMAT plan design can help efficiently and effectively design high quality IMPT plan. The quality of IMPT plan can be controlled to ensure the superiority of IMPT plan compared to VMAT/IMRT plan

  17. New model of enterprises resource planning implementation planning process in manufacturing enterprises

    Directory of Open Access Journals (Sweden)

    Mirjana Misita

    2016-05-01

    Full Text Available This article presents new model of enterprises resource planning implementation planning process in manufacturing enterprises based on assessment of risk sources. This assessment was performed by applying analytic hierarchy process. Analytic hierarchy process method allows variation of relative importance of specific risk sources dependent on the section from which the risk source originates (organizational environment, technical issues, people issues, adoption process management, and external support. Survey was conducted on 85 manufacturing enterprises involved with an enterprises resource planning solution. Ranking of risk sources assessments returns most frequent risks of enterprises resource planning implementation success in manufacturing enterprises, and representative factors were isolated through factor analysis by risk source origin. Finally, results indicate that there are hidden causes of failed implementation, for example, risk source “top management training and education,” from risk origin “adoption process management.”

  18. Basic Study of Establishment of Quality Assurance Processes to Develop an Integrated Quality Assurance System for Nuclear Power Plant Construction

    International Nuclear Information System (INIS)

    Lim, Byungki; Moon, Byeongsuk; Lee, Jae Kyoung

    2014-01-01

    An integrated quality assurance system has necessitated carrying out quality assurance programs in a systematic manner because the opportunities to expand business in overseas markets have increased since the export of a nuclear power plant to UAE in 2009. In this study, we use PDCA method to systematically analyze the quality assurance procedures that were used in previous projects for constructing nuclear power plants. We reached a classification system of quality assurance processes at each phase of nuclear power plant construction by integrating similar work related to quality such as planning, design, equipment manufacturing, construction and start-up. We also established a hierarchy of quality assurance processes to develop an integrated quality assurance system as a technology goal to be developed later. To obtain most updated quality assurance activities, a quality assurance process is structured by integrating similar works analyzed from quality assurance procedures through PDCA cycle method. At the implementation phase of Hierarchy of quality processes and sequence of processes for constructing nuclear power plant are established in this study. Integrated quality assurance system is to be developed by connecting organizations as well as stakeholders such as owners, Architect engineering, suppliers, contractors, and sub-contractors to carry out assigned work efficiently

  19. Basic Study of Establishment of Quality Assurance Processes to Develop an Integrated Quality Assurance System for Nuclear Power Plant Construction

    Energy Technology Data Exchange (ETDEWEB)

    Lim, Byungki; Moon, Byeongsuk; Lee, Jae Kyoung [Korea Hydro and Nuclear Power Co. Ltd., Daejeon (Korea, Republic of)

    2014-05-15

    An integrated quality assurance system has necessitated carrying out quality assurance programs in a systematic manner because the opportunities to expand business in overseas markets have increased since the export of a nuclear power plant to UAE in 2009. In this study, we use PDCA method to systematically analyze the quality assurance procedures that were used in previous projects for constructing nuclear power plants. We reached a classification system of quality assurance processes at each phase of nuclear power plant construction by integrating similar work related to quality such as planning, design, equipment manufacturing, construction and start-up. We also established a hierarchy of quality assurance processes to develop an integrated quality assurance system as a technology goal to be developed later. To obtain most updated quality assurance activities, a quality assurance process is structured by integrating similar works analyzed from quality assurance procedures through PDCA cycle method. At the implementation phase of Hierarchy of quality processes and sequence of processes for constructing nuclear power plant are established in this study. Integrated quality assurance system is to be developed by connecting organizations as well as stakeholders such as owners, Architect engineering, suppliers, contractors, and sub-contractors to carry out assigned work efficiently.

  20. Development and implementation of an analytical quality assurance plan at the Hanford site

    International Nuclear Information System (INIS)

    Kuhl-Klinger, K.J.; Taylor, C.D.; Kawabata, K.K.

    1995-08-01

    The Hanford Analytical Services Quality Assurance Plan (HASQAP) provides a uniform standard for onsite and offsite laboratories performing analytical work in support of Hanford Site environmental cleanup initiatives. The Hanford Site is a nuclear site that originated during World War 11 and has a legacy of environmental clean up issues. In early 1993, the need for and feasibility of developing a quality assurance plan to direct all analytical activities performed to support environmental cleanup initiatives set forth in the Hanford Federal Facility Agreement and Consent Order were discussed. Several group discussions were held and from them came the HASQAP. This document will become the quality assurance guidance document in a Federal Facility Agreement and Consent Order. This paper presents the mechanics involved in developing a quality assurance plan for this scope of activity, including the approach taken to resolve the variability of quality control requirements driven by numerous regulations. It further describes the consensus building process and how the goal of uniting onsite and offsite laboratories as well as inorganic, organic, and radioanalytic disciplines under a common understanding of basic quality control concepts was achieved

  1. Radiolytic gas generation in Salt Cake Quality Assurance Plan

    International Nuclear Information System (INIS)

    Walker, D.D.

    1993-01-01

    High-level radioactive wastes are stored in large, steel tanks in the Savannah River Site's Tank Farms. The liquid levels in these tanks are monitored to detect leakage of waste out of tanks or leakage of liquids into the tanks. Recent unexplained level fluctuations in high-level waste (HLW) tanks have caused High Level Waste Engineering (HLWE) to develop a program to better understand tank level behavioral Interim Waste Technology (IWT) has been requested by HLWE to obtain data which will lead to a better understanding of the radiolytic generation of gases in salt cake. A task plan has been written in response to this request. This document details the controls necessary to ensure the quality of the results of the activities described in the task plan

  2. Building a team through a strategic planning process.

    Science.gov (United States)

    Albert, Debra; Priganc, Dave

    2014-01-01

    Strategic planning is a process often left to senior hospital leadership, with limited input from unit-level, bedside patient care providers. This frequent approach to strategic planning misses the opportunity to engage a wide range of employees, build a shared sense of commitment, produce a collaborative team environment, and to generate greater acceptance of the plan. The Patient Care Services division at the University of Chicago Medicine used a strategic planning process that incorporated 360-degree input from both within the Patient Care Services division and outside of the division. The result is a strategic vision and plan that, shaped by broad-based input from both internal and external constituencies, is strengthened by the team that emerged from the process. Through the process of identifying a common understanding of the group's future direction, a shared purpose was created that transcended traditional professional boundaries and shaped a cohesive team focused on effective and efficient patient care. Now, with a focused strategic plan and a team centered on a shared purpose, the team is beginning to effectively deliver on the plan.

  3. Strategic-decision quality in public organizations : an information processing perspective

    OpenAIRE

    George, Bert; Desmidt, Sebastian

    2018-01-01

    textabstractThis study draws on information processing theory to investigate predictors of strategic-decision quality in public organizations. Information processing theory argues that (a) rational planning practices contribute to strategic-decision quality by injecting information into decision making and (b) decision makers contribute to strategic-decision quality by exchanging information during decision making. These assumptions are tested upon 55 Flemish pupil guidance centers. Rational ...

  4. Public Relations for Brazilian Libraries: Process, Principles, Program Planning, Planning Techniques and Suggestions.

    Science.gov (United States)

    Kies, Cosette N.

    A brief overview of the functions of public relations in libraries introduces this manual, which provides an explanation of the public relations (PR) process, including fact-finding, planning, communicating, evaluating, and marketing; some PR principles; a 10-step program that could serve as a model for planning a PR program; a discussion of PR…

  5. Towards an integration of process planning and production planning and control for flexible manufacturing systems

    NARCIS (Netherlands)

    Gaalman, GJC; Slomp, J; Suresh, NC

    This introduction article attempts to present some major issues relating to the integration of process planning and production planning and control (PPC) for flexible manufacturing systems (FMSs). It shows that the performance of an FMS can be significantly improved and FMS capabilities more

  6. 42 CFR 460.132 - Quality assessment and performance improvement plan.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 4 2010-10-01 2010-10-01 false Quality assessment and performance improvement plan... assessment and performance improvement plan. (a) Basic rule. A PACE organization must have a written quality assessment and performance improvement plan. (b) Annual review. The PACE governing body must review the plan...

  7. 40 CFR 35.925-2 - Water quality management plans and agencies.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Water quality management plans and... Water Act § 35.925-2 Water quality management plans and agencies. That the project is consistent with any applicable water quality management (WQM) plan approved under section 208 or section 303(e) of the...

  8. Sandia National Laboratories Advanced Simulation and Computing (ASC) software quality plan. Part 1 : ASC software quality engineering practices version 1.0.

    Energy Technology Data Exchange (ETDEWEB)

    Minana, Molly A.; Sturtevant, Judith E.; Heaphy, Robert; Hodges, Ann Louise; Boucheron, Edward A.; Drake, Richard Roy; Forsythe, Christi A.; Schofield, Joseph Richard, Jr.; Pavlakos, Constantine James; Williamson, Charles Michael; Edwards, Harold Carter

    2005-01-01

    The purpose of the Sandia National Laboratories (SNL) Advanced Simulation and Computing (ASC) Software Quality Plan is to clearly identify the practices that are the basis for continually improving the quality of ASC software products. Quality is defined in DOE/AL Quality Criteria (QC-1) as conformance to customer requirements and expectations. This quality plan defines the ASC program software quality practices and provides mappings of these practices to the SNL Corporate Process Requirements (CPR 1.3.2 and CPR 1.3.6) and the Department of Energy (DOE) document, ASCI Software Quality Engineering: Goals, Principles, and Guidelines (GP&G). This quality plan identifies ASC management and software project teams' responsibilities for cost-effective software engineering quality practices. The SNL ASC Software Quality Plan establishes the signatories commitment to improving software products by applying cost-effective software engineering quality practices. This document explains the project teams opportunities for tailoring and implementing the practices; enumerates the practices that compose the development of SNL ASC's software products; and includes a sample assessment checklist that was developed based upon the practices in this document.

  9. Quality Assurance Program Plan for the Environmental Restoration Program

    International Nuclear Information System (INIS)

    1992-01-01

    The United States Department of Energy (USDOE) has initiated the Environmental Restoration Program (ERP) in an effort to manage, control and remediate existing hazardous, toxic and radioactive wastes generated at the Portsmouth Gaseous Diffusion Plant (PORTS). This ERP Quality Assurance Program Plan (QAPP) is responsive to the PORTS ESH Division QAPP and the ES Environmental Restoration Division (ERD) QAPP. This QAPP establishes the policies, requirements and responsibilities by which an appropriate level of QA shall be implemented within the PORTS-ERP. All PORTS-ERP activities shall be conducted in accordance with the requirements of this document and/or of a project level document which is derivative of this document

  10. A summary of deliberations on strategic planning for continuous quality improvement in laboratory medicine.

    Science.gov (United States)

    Grzybicki, Dana Marie; Shahangian, Shahram; Pollock, Anne M; Raab, Stephen S

    2009-03-01

    On September 24-26, 2007, the Centers for Disease Control and Prevention convened the 2007 Institute on Critical Issues in Health Laboratory Practice: Managing for Better Health to develop an action plan for change for the immediate and long-term future. A wide variety of stakeholders, including pathologists, pathologist extenders, clinicians, and researchers, examined means to improve laboratory service communication, quality parameters, and potential future laboratory contributions to health care. In this summary document, we present the identified gaps, barriers, and proposed action plans for improvement for laboratory medicine in the 6 quality domains identified by the Institute of Medicine: safety, effectiveness, patient centeredness, timeliness, efficiency, and equity. Five major recommendations emerged from concluding discussions and included focusing on preanalytic and postanalytic processes as areas of potential quality improvement and recruiting a multidisciplinary group of nonlaboratory stakeholders to work with laboratory personnel to achieve improvement goals.

  11. A case study on measuring process quality : lessons learned

    NARCIS (Netherlands)

    Dikici, A.; Türetken, O.; Demirors, O.; Cortellessa, V.; Muccini, H.; Demirors, O.

    2012-01-01

    Requiring solid engineering disciplines and best practices rather than human talents for developing complex software systems results an increasing interest in software processes. The quality of software processes has considerable influence over the success of an organization. Process quality

  12. Analysis of the Contingency Contracting Support Plan within the Joint Planning Process Framework

    National Research Council Canada - National Science Library

    Anderson, Michael

    2003-01-01

    ...) flexibility and responsiveness. Current OPLANS at the Joint-level generally discuss how forces will be contractually supported in-theater, but are not specific enough within the framework of the Joint Planning Process (JPP...

  13. Newly Developed Software Application for Multiple Access Process Planning

    Directory of Open Access Journals (Sweden)

    Katarina Monkova

    2014-11-01

    Full Text Available The purchase of a complex system for computer aided process planning (CAPP can be expensive for little and some middle sized plants, sometimes an inaccessible investment, with a long recoupment period. According to this fact and the author's experience with Eastern European plants, they decided to design a new database application which is suitable for production, stock, and economic data holding as well as processing and exploitation within the manufacturing process. The application can also be used to process a plan according to the selected criteria, for technological documentation and NC program creation. It was based on the theory of a multivariant approach to computer aided plan generation. Its fundamental features, the internal mathematical structure and new code system of processed objects, were prepared by the authors. The verification of the designed information system in real practice has shown that it enables about 30% cost and production time reduction and decreases input material assortment variability.

  14. Use of quality planning methods in optimizing welding wire quality characteristics

    Directory of Open Access Journals (Sweden)

    D. Vykydal

    2013-10-01

    Full Text Available The quality of a product is given by the extent, to which the product meets customer requirements. It is generally accepted that the extent, to which the product meets such customer requirements, and, consequently, the resulting quality of the product itself, substantially depend on the early stages of the product lifecycle, i.e. on the design and development stages. Appropriate means for effective product quality planning can be found among quality management methods and tools. These methods are typically employed in engineering production and automotive industry. This paper focuses on exploring the potential of Quality Function Deployment (QFD and Failure Mode and Effect Analysis (FMEA methods for use in metallurgical production, an industrial branch where they have not been commonly employed as yet.

  15. Definition of Quality of Education: The Halifax Plan.

    Science.gov (United States)

    Doehler, Murray E.; Perry, Karl W.

    1987-01-01

    Professional personnel and building maintenance were studied by the Halifax School District Board (Nova Scotia) to examine economy and efficiency and to determine quality education, using the value-for-money concept. This process can be utilized by any board to assist in identifying areas needing analysis, but program effectiveness should also be…

  16. Legacy Management CERCLA Sites. Quality Assurance Project Plan

    International Nuclear Information System (INIS)

    2007-01-01

    S.M. Stoller Corporation is the contractor for the Technical Assistance Contract (TAC) for the U.S. Department of Energy (DOE) Office of Legacy Management (LM) operations. Stoller employs a management system that applies to all programs, projects, and business management systems funded through DOE-LM task orders. The management system incorporates the philosophy, policies, and requirements of health and safety, environmental compliance, and quality assurance (QA) in all aspects of project planning and implementation. Health and safety requirements are documented in the Health and Safety Manual (STO 2), the Radiological Control Manual (STO 3), the Integrated Safety Management System Description (STO 10), and the Drilling Health and Safety Requirements (STO 14). Environmental compliance policy and requirements are documented in the Environmental Management Program Implementation Manual (STO 11). The QA Program is documented in the Quality Assurance Manual (STO 1). The QA Manual (STO 1) implements the specific requirements and philosophy of DOE Order 414.1C, Quality Assurance. This manual also includes the requirements of other standards that are regularly imposed by customers, regulators, or other DOE orders. Title 10 Code of Federal Regulations Part 830, 'Quality Assurance Requirements', ANSI/ASQC E4-2004, 'Quality Systems for Environmental Data and Technology Programs - Requirements with Guidance for Use', and ISO 14001-2004, 'Environmental Management Systems', have been included. These standards are similar in content. The intent of the QA Manual (STO 1) is to provide a QA management system that incorporates the requirements and philosophy of DOE and other customers within the QA Manual. Criterion 1, 'Quality Assurance Program', identifies the fundamental requirements for establishing and implementing the QA management system; QA Instruction (QAI) 1.1, 'QA Program Implementation', identifies the TAC organizations that have responsibility for implementing the QA

  17. Quality Indicators for the Total Testing Process.

    Science.gov (United States)

    Plebani, Mario; Sciacovelli, Laura; Aita, Ada

    2017-03-01

    ISO 15189:2012 requires the use of quality indicators (QIs) to monitor and evaluate all steps of the total testing process, but several difficulties dissuade laboratories from effective and continuous use of QIs in routine practice. An International Federation of Clinical Chemistry and Laboratory Medicine working group addressed this problem and implemented a project to develop a model of QIs to be used in clinical laboratories worldwide to monitor and evaluate all steps of the total testing process, and decrease error rates and improve patient services in laboratory testing. All laboratories are invited, at no cost, to enroll in the project and contribute to harmonized management at the international level. Copyright © 2016 Elsevier Inc. All rights reserved.

  18. Patient-specific dosimetric endpoints based treatment plan quality control in radiotherapy

    International Nuclear Information System (INIS)

    Song, Ting; Zhou, Linghong; Staub, David; Chen, Mingli; Lu, Weiguo; Tian, Zhen; Jia, Xun; Li, Yongbao; Jiang, Steve B; Gu, Xuejun

    2015-01-01

    In intensity modulated radiotherapy (IMRT), the optimal plan for each patient is specific due to unique patient anatomy. To achieve such a plan, patient-specific dosimetric goals reflecting each patient’s unique anatomy should be defined and adopted in the treatment planning procedure for plan quality control. This study is to develop such a personalized treatment plan quality control tool by predicting patient-specific dosimetric endpoints (DEs). The incorporation of patient specific DEs is realized by a multi-OAR geometry-dosimetry model, capable of predicting optimal DEs based on the individual patient’s geometry. The overall quality of a treatment plan is then judged with a numerical treatment plan quality indicator and characterized as optimal or suboptimal. Taking advantage of clinically available prostate volumetric modulated arc therapy (VMAT) treatment plans, we built and evaluated our proposed plan quality control tool. Using our developed tool, six of twenty evaluated plans were identified as sub-optimal plans. After plan re-optimization, these suboptimal plans achieved better OAR dose sparing without sacrificing the PTV coverage, and the dosimetric endpoints of the re-optimized plans agreed well with the model predicted values, which validate the predictability of the proposed tool. In conclusion, the developed tool is able to accurately predict optimally achievable DEs of multiple OARs, identify suboptimal plans, and guide plan optimization. It is a useful tool for achieving patient-specific treatment plan quality control. (paper)

  19. China's women leaders promote quality and equity in family planning.

    Science.gov (United States)

    He, S

    1995-08-01

    In China, key policy-makers at the highest levels of government recognize that the success of the family planning (FP) program depends upon improving the status of Chinese women. The highest ranking female government official, Peng Peiyun, a State Councilor and the Minister of the State Family Planning (FP) Commission, has initiated a new policy of improving the quality of service in the FP program. She recognizes that women who are gainfully employed and control their income are less likely to desire large families. One aspect of the effort to improve quality involves training FP personnel in interpersonal communication and counseling skills. The results of a pilot training program show that clients are pleased with the new approach and that use of FP services has increased. The FP Commission is also experimenting with programs which integrate all the needs of women and their families (FP, credit availability, old age support) in rural areas. Traditionally, sons provided for their elderly parents, so families with only one daughter are concerned about old age provision. Thus, national efforts are underway to develop social security systems. In the meantime, women at all levels, from grassroots FP acceptors to FP staff members and researchers are the major contributors to the innovations which will allow China to control its population growth.

  20. Integrated energy, air quality and greenhouse gas management plan

    International Nuclear Information System (INIS)

    2004-03-01

    This report outlines the measures that the Resort Municipality of Whistler has taken to become a sustainable community. In 2000, the Municipality adopted the Natural Step, a tool developed by international scientists to integrate ecological principles into the practices of communities, organizations and individuals. In 2001, the Municipality adopted a comprehensive sustainability plan. This report describes the efforts to manage energy, air quality, and greenhouse gases (GHG). More than 90 per cent of the common air contaminants that contribute to air quality problems in Whistler come from the combustion of fossil fuels. The community can reduce emissions of carbon monoxide, oxides of nitrogen, oxides of sulphur, volatile organic compounds, and particulate matter by managing energy and GHG emissions. This report is divided into several sections dealing with corporate and community energy use. It presents a community profile for Whistler, its energy and emissions inventory from 2000, and an integrated energy plan. An energy and emissions forecast for 2000 to 2020 was also included along with an implementation strategy for a sustainable energy future for Whistler. refs., tabs., figs

  1. quality assurance calculation in UO2 pellet manufacturing process

    International Nuclear Information System (INIS)

    Can, S.; Acarkan, S.; Guereli, L. and others

    1997-01-01

    A process qualification plan is prepared for preparation of quality assurance documentation in accordance with ISO-9000 series of standards, for sintered UO 2 pellets manufactured in the Nuclear Fuel Technology Department. The objectives of this plan are to determine quantitatively and statistically process capability of the pellet production, to check product properties (are) in conformance with specifications at the pre-( ) confidence levels, to prepare necessary documents and to assess the results. The product properties taking into account are chemical composition, cracks, density, microstructure and grain size. The statistical parameters used for qualification element of quality assurance are calculated.Statistical values for sintered pellets are: LENGTH/WEIGHT/DIAMETER/DENSITY/%TD: MEAN:13,395/16,808/12,293/10,679/97,400 STD:0,1651/ 0,252/0,0212/0,015/0,140. It was seen that sintered pellets manufactured in the Nuclear Fuel Technology Department meet the criteria within 95% confidence level. In this paper specifications, criteria and calculations will be explained in detail

  2. A systematic process for developing and assessing accident management plans

    International Nuclear Information System (INIS)

    Hanson, D.J.; Blackman, H.S.; Meyer, O.R.; Ward, L.W.

    1991-04-01

    This document describes a four-phase approach for developing criteria recommended for use in assessing the adequacy of nuclear power plant accident management plans. Two phases of the approach have been completed and provide a prototype process that could be used to develop an accident management plan. Based on this process, a preliminary set of assessment criteria are derived. These preliminary criteria will be refined and improved when the remaining steps of the approach are completed, that is, after the prototype process is validated through application. 9 refs., 10 figs., 7 tabs

  3. City Labs as Vehicles for Innovation in Urban Planning Processes

    Directory of Open Access Journals (Sweden)

    Christian Scholl

    2016-12-01

    Full Text Available This paper assesses the role of urban experiments for local planning processes through a case-based analysis of the city lab of Maastricht. In conjunction with this, the article offers three contributions, as additional elements. Firstly, the paper develops a set of defining characteristics of city labs as an analytical concept which is relevant for discussions about (collaborative planning. Secondly, it refines the literature on collaborative planning by drawing attention to experimentation and innovation. Thirdly, the paper assesses the potential of city labs to contribute to the innovation of urban governance. The work draws from the literature on experimentation and learning as well as the literature on collaborative urban planning. In the conclusions, we discuss the potential of city labs as vehicles for learning about new urban planning approaches and their limitations as spaces for small-scale experimentation. The paper is based on research for the URB@Exp research project funded by JPI Urban Europe.

  4. Work-in-process clearing in supply chain operations planning

    NARCIS (Netherlands)

    Selcuk, B.; Fransoo, J.C.; Kok, de A.G.

    2008-01-01

    In this study we provide insights into the effectiveness of the clearing function concept in a hierarchical planning context. The clearing function is a mathematical representation of the relation between the Work-In-Process (WIP) and the throughput of a production process. We use it in a

  5. A key to success: optimizing the planning process

    Science.gov (United States)

    Turk, Huseyin; Karakaya, Kamil

    2014-05-01

    By adopting The NATO Strategic Concept Document in 2010, some important changes in the perception of threat and management of crisis were introduced. This new concept, named ''Comprehensive Approach'', includes the precautions of pre-crisis management, applications of crisis-duration management and reconstruction phase of post-intervention management. NATO will be interested in not only the political and military options , but also social, economical and informational aspects of crisis. NATO will take place in all phases of conflict. The conflicts which occur outside the borders of NATO's nations and terrorism are perceived as threat sources for peace and stability. In addition to conventional threats, cyber attacks which threaten network-supported communication systems, preventing applications from accessing to space that will be used in different fields of life. On the other hand, electronic warfare capabilities which can effect us negatively are added to threat list as new threats. In the process in which military is thought as option, a harder planning phase is waiting for NATO's decision makers who struggle for keeping peace and security. Operation planning process which depends on comprehensive approach, contains these steps: Situational awareness of battlefield, evaluation of the military intervention options, orientation, developing an operation plan, reviewing the plan and transition phases.1 To be successful in theater which is always changing with the technological advances, there has to be an accurate and timely planning on the table. So, spending time for planning can be shown as one of the biggest problem. In addition, sustaining situational awareness which is important for the whole operation planning process, technical command and control hitches, human factor, inability to determine the center of gravity of opponent in asymmetrical threat situations can be described as some of the difficulties in operation planning. In this study, a possible air

  6. Statistical process control: An approach to quality assurance in the production of vitrified nuclear waste

    International Nuclear Information System (INIS)

    Pulsipher, B.A.; Kuhn, W.L.

    1987-01-01

    Current planning for liquid high-level nuclear wastes existing in the United States includes processing in a liquid-fed ceramic melter to incorporate it into a high-quality glass, and placement in a deep geologic repository. The nuclear waste vitrification process requires assurance of a quality product with little or no final inspection. Statistical process control (SPC) is a quantitative approach to one quality assurance aspect of vitrified nuclear waste. This method for monitoring and controlling a process in the presence of uncertainties provides a statistical basis for decisions concerning product quality improvement. Statistical process control is shown to be a feasible and beneficial tool to help the waste glass producers demonstrate that the vitrification process can be controlled sufficiently to produce an acceptable product. This quantitative aspect of quality assurance could be an effective means of establishing confidence in the claims to a quality product

  7. Statistical process control: An approach to quality assurance in the production of vitrified nuclear waste

    International Nuclear Information System (INIS)

    Pulsipher, B.A.; Kuhn, W.L.

    1987-02-01

    Current planning for liquid high-level nuclear wastes existing in the US includes processing in a liquid-fed ceramic melter to incorporate it into a high-quality glass, and placement in a deep geologic repository. The nuclear waste vitrification process requires assurance of a quality product with little or no final inspection. Statistical process control (SPC) is a quantitative approach to one quality assurance aspect of vitrified nuclear waste. This method for monitoring and controlling a process in the presence of uncertainties provides a statistical basis for decisions concerning product quality improvement. Statistical process control is shown to be a feasible and beneficial tool to help the waste glass producers demonstrate that the vitrification process can be controlled sufficiently to produce an acceptable product. This quantitative aspect of quality assurance could be an effective means of establishing confidence in the claims to a quality product. 2 refs., 4 figs

  8. 77 FR 2469 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Science.gov (United States)

    2012-01-18

    ... the California State Implementation Plan, Antelope Valley Air Quality Management District and Imperial... Quality Management District (AVAQMD) and Imperial County Air Pollution Control District (ICAPCD) portions... Technology (RACT),'' adopted on February 23, 2010. * * * * * (G) Antelope Valley Air Quality Management...

  9. 75 FR 61367 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2010-10-05

    ... the California State Implementation Plan, South Coast Air Quality Management District AGENCY... the South Coast Air Quality Management District (SCAQMD) portion of the California State... Measure for Architectural Coatings,'' CARB, October 2007. 4. ``Improving Air Quality with Economic...

  10. 77 FR 65133 - Revisions to the California State Implementation Plan, Mojave Desert Air Quality Management District

    Science.gov (United States)

    2012-10-25

    ... the California State Implementation Plan, Mojave Desert Air Quality Management District AGENCY... limited disapproval of revisions to the Mojave Desert Air Quality Management District (MDAQMD) portion of.... * * * * * (c) * * * (379) * * * (i) * * * (E) Mojave Desert Air Quality Management District. (1) Rule 1159...

  11. 78 FR 21582 - Revisions to the California State Implementation Plan, Butte County Air Quality Management...

    Science.gov (United States)

    2013-04-11

    ... the California State Implementation Plan, Butte County Air Quality Management District and Sacramento Metropolitan Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve revisions to the Butte County Air Quality Management...

  12. 76 FR 70888 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2011-11-16

    ... the California State Implementation Plan, South Coast Air Quality Management District AGENCY... the South Coast Air Quality Management District (SCAQMD) portion of the California State... Quality Management District--SCAQMD) (1) Rule 1143, ``Consumer Paint Thinners & Multi-purpose Solvents...

  13. 77 FR 66780 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2012-11-07

    ... the California State Implementation Plan, South Coast Air Quality Management District AGENCY... the South Coast Air Quality Management District (SCAQMD) portion of the California State... Control Measure for Architectural Coatings,'' CARB, October 2007. 4. ``Improving Air Quality with Economic...

  14. 77 FR 12526 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Science.gov (United States)

    2012-03-01

    ... the California State Implementation Plan, Antelope Valley Air Quality Management District and Mojave Desert Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve revisions to the Antelope Valley Air Quality Management District...

  15. 78 FR 45114 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Science.gov (United States)

    2013-07-26

    ... the California State Implementation Plan, Antelope Valley Air Quality Management District AGENCY... the Antelope Valley Air Quality Management District (AVAQMD) portion of the California State... for the South Coast Air Quality Management District (SCAQMD). The Antelope Valley Air Pollution...

  16. 75 FR 40762 - Revisions to the California State Implementation Plan, Sacramento Metropolitan Air Quality...

    Science.gov (United States)

    2010-07-14

    ... the California State Implementation Plan, Sacramento Metropolitan Air Quality Management District and South Coast Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve revisions to the Sacramento Metropolitan Air Quality...

  17. University Community Engagement and the Strategic Planning Process

    Directory of Open Access Journals (Sweden)

    Laura Newton Miller

    2018-03-01

    Full Text Available Abstract  Objectives – To understand how university libraries are engaging with the university community (students, faculty, campus partners, and administration when working through the strategic planning process.  Methods – Literature review and exploratory open-ended survey to members of CAUL (Council of Australian University Librarians, CARL (Canadian Association of Research Libraries, CONZUL (Council of New Zealand University Librarians, and RLUK (Research Libraries UK who are most directly involved in the strategic planning process at their library.  Results – Out of a potential 113 participants from 4 countries, 31 people (27% replied to the survey. Libraries most often mentioned the use of regularly-scheduled surveys to inform their strategic planning, which helps to truncate the process for some respondents, as opposed to conducting user feedback specifically for the strategic planning process. Other quantitative methods include customer intelligence and library-produced data. Qualitative methods include the use of focus groups, interviews, and user experience/design techniques to help inform the strategic plan. The focus of questions to users tended to fall towards user-focused (with or without library lens, library-focused, trends and vision, and feedback on plan.  Conclusions – Combining both quantitative and qualitative methods can help give a fuller picture for librarians working on a strategic plan. Having the university community join the conversation on how the library moves forward is an important but difficult endeavour.  Regardless, the university library needs to be adaptive to the rapidly changing environment around it. Having a sense of how other libraries engage with the university community benefits others who are tasked with strategic planning.

  18. Quality-assurance and data management plan for groundwater activities by the U.S. Geological Survey in Kansas, 2014

    Science.gov (United States)

    Putnam, James E.; Hansen, Cristi V.

    2014-01-01

    As the Nation’s principle earth-science information agency, the U.S. Geological Survey (USGS) is depended on to collect data of the highest quality. This document is a quality-assurance plan for groundwater activities (GWQAP) of the Kansas Water Science Center. The purpose of this GWQAP is to establish a minimum set of guidelines and practices to be used by the Kansas Water Science Center to ensure quality in groundwater activities. Included within these practices are the assignment of responsibilities for implementing quality-assurance activities in the Kansas Water Science Center and establishment of review procedures needed to ensure the technical quality and reliability of the groundwater products. In addition, this GWQAP is intended to complement quality-assurance plans for surface-water and water-quality activities and similar plans for the Kansas Water Science Center and general project activities throughout the USGS. This document provides the framework for collecting, analyzing, and reporting groundwater data that are quality assured and quality controlled. This GWQAP presents policies directing the collection, processing, analysis, storage, review, and publication of groundwater data. In addition, policies related to organizational responsibilities, training, project planning, and safety are presented. These policies and practices pertain to all groundwater activities conducted by the Kansas Water Science Center, including data-collection programs, interpretive and research projects. This report also includes the data management plan that describes the progression of data management from data collection to archiving and publication.

  19. The World Health Organization's water safety plan is much more than just an integrated drinking water quality management plan.

    Science.gov (United States)

    Viljoen, F C

    2010-01-01

    South Africa is a country of contrasts with far ranging variations in climate, precipitation rates, cultures, demographics, housing levels, education, wealth and skills levels. These differences have an impact on water services delivery as do expectations, affordability and available resources. Although South Africa has made much progress in supplying drinking water, the same cannot be said regarding water quality throughout the country. A concerted effort is currently underway to correct this situation and as part of this drive, water safety plans (WSP) are promoted. Rand Water, the largest water services provider in South Africa, used the World Health Organization (WHO) WSP framework as a guide for the development of its own WSP which was implemented in 2003. Through the process of implementation, Rand Water found the WHO WSP to be much more than just another integrated quality system.

  20. Tracking the Short Term Planning (STP) Development Process

    Science.gov (United States)

    Price, Melanie; Moore, Alexander

    2010-01-01

    Part of the National Aeronautics and Space Administration?s mission is to pioneer the future in space exploration, scientific discovery and aeronautics research is enhanced by discovering new scientific tools to improve life on earth. Sequentially, to successfully explore the unknown, there has to be a planning process that organizes certain events in the right priority. Therefore, the planning support team has to continually improve their processes so the ISS Mission Operations can operate smoothly and effectively. The planning support team consists of people in the Long Range Planning area that develop timelines that includes International Partner?s Preliminary STP inputs all the way through to publishing of the Final STP. Planning is a crucial part of the NASA community when it comes to planning the astronaut?s daily schedule in great detail. The STP Process is in need of improvement, because of the various tasks that are required to be broken down in order to get the overall objective of developing a Final STP done correctly. Then a new project came along in order to store various data in a more efficient database. "The SharePoint site is a Web site that provides a central storage and collaboration space for documents, information, and ideas."

  1. Pacific Northwest National Laboratory Apatite Investigation at the 100-NR-2 Quality Assurance Project Plan

    Energy Technology Data Exchange (ETDEWEB)

    Fix, N. J.

    2008-03-28

    This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by staff working on the 100-NR-2 Apatite Project. The U.S. Department of Energy, Fluor Hanford, Inc., Pacific Northwest National Laboratory, and the Washington Department of Ecology agreed that the long-term strategy for groundwater remediation at 100-N would include apatite sequestration as the primary treatment, followed by a secondary treatment. The scope of this project covers the technical support needed before, during, and after treatment of the targeted subsurface environment using a new high-concentration formulation.

  2. State landscape in public health planning and quality improvement: results of the ASTHO survey.

    Science.gov (United States)

    Madamala, Kusuma; Sellers, Katie; Pearsol, Jim; Dickey, Michael; Jarris, Paul E

    2010-01-01

    Limited data exist on state public health agencies and their use of planning and quality improvement (QI) initiatives. Using the 2007 Association of State and Territorial Health Officials (ASTHO) State Public Health Survey, this article describes how state public health agencies perform tasks related to planning, performance management (PM), and QI. While 82 percent of respondents report having a QI process in place, only 9.8 percent have it fully implemented departmentwide. Seventy-six percent reported having a PM process in place, with 16 percent (n = 8) having it fully implemented departmentwide. A state health improvement plan was used by 80.4 percent of respondents, with 56.9 percent of respondents completing the plan more than 3 years ago. More than two-thirds (68.2%) of the respondents developed the plan by using results of their state health assessment. Analysis of state health department level planning, PM, and QI initiatives can inform states' efforts to ready themselves to meet the proposed national voluntary accreditation standards of the Public Health Accreditation Board.

  3. 242-A Campaign 99-1 process control plan; FINAL

    International Nuclear Information System (INIS)

    LE, E.Q.

    1999-01-01

    242-A Evaporator 99-1 will process approximately one million gallons of waste from tank 102-AW in June 1999. The process control Plan provides a general description of activities, which will occur during 242-A Evaporator Campaign 99-1 and to document analyses conducted to demonstrate that 102-AW waste is acceptable for processing. Predict is a registered trademark of Risk Decisions England Corporation, United Kingdom

  4. Energy efficient process planning based on numerical simulations

    OpenAIRE

    Neugebauer, Reimund; Hochmuth, C.; Schmidt, G.; Dix, M.

    2011-01-01

    The main goal of energy-efficient manufacturing is to generate products with maximum value-added at minimum energy consumption. To this end, in metal cutting processes, it is necessary to reduce the specific cutting energy while, at the same time, precision requirements have to be ensured. Precision is critical in metal cutting processes because they often constitute the final stages of metalworking chains. This paper presents a method for the planning of energy-efficient machining processes ...

  5. Routine Radiological Environmental Monitoring Plan. Appendices

    International Nuclear Information System (INIS)

    Bechtel Nevada

    1998-01-01

    Supporting material for the plan includes: QUALITY ASSURANCE, ANALYSIS, AND SAMPLING PLAN FOR NTS AIR; QUALITY ASSURANCE, ANALYSIS, AND SAMPLING PLAN FOR WATER ON AND OFF THE NEVADA TEST SITE; QUALITY ASSURANCE, ANALYSIS, AND SAMPLING PLAN FOR NTS BIOTA; QUALITY ASSURANCE, ANALYSIS, AND SAMPLING PLAN FOR DIRECT RADIATION MONITORING; DATA QUALITY OBJECTIVES PROCESS; VADOSE ZONE MONITORING PLAN CHECKLIST

  6. Emergency preparedness planning: A process to insure effectiveness and efficiency

    International Nuclear Information System (INIS)

    Schroeder, A.J. Jr.

    1994-01-01

    Prevention is undoubtedly the preferred policy regarding emergency response. Unfortunately, despite best intentions, emergencies do occur. It is the prudent operator that has well written and exercised plans in place to respond to the full suite of possible situations. This paper presents a planning process to help personnel develop and/or maintain emergency management capability. It is equally applicable at the field location, the district/regional office, or the corporate headquarters. It is not limited in scope and can be useful for planners addressing incidents ranging from fires, explosions, spills/releases, computer system failure, terrorist threats and natural disasters. By following the steps in the process diagram, the planner will document emergency management capability in a logical and efficient manner which should result in effective emergency response and recovery plans. The astute planner will immediately see that the process presented is a continuing one, fully compatible with the principles of continuous improvement

  7. Automated synthesis of image processing procedures using AI planning techniques

    Science.gov (United States)

    Chien, Steve; Mortensen, Helen

    1994-01-01

    This paper describes the Multimission VICAR (Video Image Communication and Retrieval) Planner (MVP) (Chien 1994) system, which uses artificial intelligence planning techniques (Iwasaki & Friedland, 1985, Pemberthy & Weld, 1992, Stefik, 1981) to automatically construct executable complex image processing procedures (using models of the smaller constituent image processing subprograms) in response to image processing requests made to the JPL Multimission Image Processing Laboratory (MIPL). The MVP system allows the user to specify the image processing requirements in terms of the various types of correction required. Given this information, MVP derives unspecified required processing steps and determines appropriate image processing programs and parameters to achieve the specified image processing goals. This information is output as an executable image processing program which can then be executed to fill the processing request.

  8. Product quality driven food process design

    NARCIS (Netherlands)

    Hadiyanto, M.

    2007-01-01

    Consumers evaluate food products on their quality, and thus the product quality is a main target in industrial food production. In the last decade there has been a remarkable increase of interest of the food industry to put food product quality central in innovation. However, quality itself is

  9. Quality assurance program plan for 324 Building B-Cell safety cleanout project (BCCP)

    International Nuclear Information System (INIS)

    Tanke, J.M.

    1997-01-01

    This Quality Assurance Program Plan (QAPP) provides information on how the Quality Assurance Program is implemented for the 324 Building B-Cell Safety Cleanout Project (BCCP). This QAPP is responsive to the Westinghouse Hanford Company Quality Assurance Program and Implementation Plan, WHC-SP-1131, for 10 CFR 830.120, Nuclear Safety Management, Quality Assurance Requirements; and DOE Order 5700.6C, Quality Assurance. This QAPP supersedes PNNL PNL-MA-70 QAP Quality Assurance Plan No. WTC-050 Rev. 2, issue date May 3, 1996. This QAPP has been developed specifically for the BCCP. It applies to those items and tasks which affect the completion of activities identified in the work breakdown structure of the Project Management Plan (PMP). These activities include all aspects of decontaminating B-Cell and project related operations within the 324 Building as it relates to the specific activities of this project. General facility activities (i.e. 324 Building Operations) are covered in the Building 324 QAPP. In addition, this QAPP supports the related quality assurance activities addressed in CM-2-14, Hazardous Material Packaging and Shipping, and HSRCM-1, Hanford Site Radiological Control Manual, The 324 Building is currently transitioning from being a Pacific Northwest National Laboratory (PNNL) managed facility to a B and W Hanford Company (BWHC) managed facility. During this transition process existing, PNNL procedures and documents will be utilized until replaced by BWHC procedures and documents. These documents conform to the requirements found in PNL-MA-70, Quality Assurance Manual and PNL-MA-8 1, Hazardous Materials Shipping Manual. The Quality Assurance Program Index (QAPI) contained in Table 1 provides a matrix which shows how project activities relate to 10 CFR 83 0.120 and 5700.6C criteria. Quality Assurance program requirements will be addressed separate from the requirements specified in this document. Other Hanford Site organizations/companies may be

  10. Process development work plan for waste feed delivery system

    International Nuclear Information System (INIS)

    Papp, I.G.

    1998-01-01

    This work plan defines the process used to develop project definition for Waste Feed Delivery (WFD). Project definition provides the direction for development of definitive design media required for the ultimate implementation of operational processing hardware and software. Outlines for the major deliverables are attached as appendices. The implementation of hardware and software will accommodate requirements for safe retrieval and delivery of waste currently stored in Hanford's underground storage tanks. Operations and maintenance ensure the availability of systems, structures, and components for current and future planned operations within the boundary of the Tank Waste Remediation System (TWRS) authorization basis

  11. Process Approach to Cost of Quality

    Directory of Open Access Journals (Sweden)

    Katarzyna Szczepańska

    2009-12-01

    Full Text Available Contemporary understanding comprehending cost of quality is connected both with the sphere of the management, as well as the operational activity. Borders of considering the category of quality costs moved beyond the technical – technological area. Trial including costs let the quality for classifying them with reference to all action carried out in the modern enterprise. Standard models of quality costs and the activity – based costing appointed new prospects of economics of the quality in the business administration.

  12. 77 FR 41132 - Air Quality Implementation Plans; Alabama; Attainment Plan for the Alabama Portion of the...

    Science.gov (United States)

    2012-07-12

    ...-quality modeling studies, chemical-tracer studies, emissions inventories, or special intensive measurement... by chemical reactions in the atmosphere). Some of the physicochemical processes leading to the... Requirements 3. Modeling 4. Reasonably Available Control Measures/Reasonably Available Control Technology (RACM...

  13. Advance care planning in CKD/ESRD: an evolving process.

    Science.gov (United States)

    Holley, Jean L

    2012-06-01

    Advance care planning was historically considered to be simply the completion of a proxy (health care surrogate designation) or instruction (living will) directive that resulted from a conversation between a patient and his or her physician. We now know that advance care planning is a much more comprehensive and dynamic patient-centered process used by patients and families to strengthen relationships, achieve control over medical care, prepare for death, and clarify goals of care. Some advance directives, notably designated health care proxy documents, remain appropriate expressions of advance care planning. Moreover, although physician orders, such as do-not-resuscitate orders and Physician Orders for Life-Sustaining Treatment, may not be strictly defined as advance directives, their completion, when appropriate, is an integral component of advance care planning. The changing health circumstances and illness trajectory characteristic of ESRD mandate that advance care planning discussions adapt to a patient's situation and therefore must be readdressed at appropriate times and intervals. The options of withholding and withdrawing dialysis add ESRD-specific issues to advance care planning in this population and are events each nephrologist will at some time confront. Advance care planning is important throughout the spectrum of ESRD and is a part of nephrology practice that can be rewarding to nephrologists and beneficial to patients and their families.

  14. Association between product quality control and process quality control of bulk milk

    NARCIS (Netherlands)

    Velthuis, A.; Asseldonk, van M.A.P.M.

    2010-01-01

    Assessment of dairy-milk quality is based on product quality control (testing bulk-milk samples) and process quality control (auditing dairy farms). It is unknown whether process control improves product quality. To quantify possible association between product control and process control a

  15. Comprehensive integrated planning: A process for the Oak Ridge Reservation, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1998-05-01

    The Oak Ridge Comprehensive Integrated Plan is intended to assist the US Department of Energy (DOE) and contractor personnel in implementing a comprehensive integrated planning process consistent with DOE Order 430.1, Life Cycle Asset Management and Oak Ridge Operations Order 430. DOE contractors are charged with developing and producing the Comprehensive Integrated Plan, which serves as a summary document, providing information from other planning efforts regarding vision statements, missions, contextual conditions, resources and facilities, decision processes, and stakeholder involvement. The Comprehensive Integrated Plan is a planning reference that identifies primary issues regarding major changes in land and facility use and serves all programs and functions on-site as well as the Oak Ridge Operations Office and DOE Headquarters. The Oak Ridge Reservation is a valuable national resource and is managed on the basis of the principles of ecosystem management and sustainable development and how mission, economic, ecological, social, and cultural factors are used to guide land- and facility-use decisions. The long-term goals of the comprehensive integrated planning process, in priority order, are to support DOE critical missions and to stimulate the economy while maintaining a quality environment

  16. Comprehensive integrated planning: A process for the Oak Ridge Reservation, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-05-01

    The Oak Ridge Comprehensive Integrated Plan is intended to assist the US Department of Energy (DOE) and contractor personnel in implementing a comprehensive integrated planning process consistent with DOE Order 430.1, Life Cycle Asset Management and Oak Ridge Operations Order 430. DOE contractors are charged with developing and producing the Comprehensive Integrated Plan, which serves as a summary document, providing information from other planning efforts regarding vision statements, missions, contextual conditions, resources and facilities, decision processes, and stakeholder involvement. The Comprehensive Integrated Plan is a planning reference that identifies primary issues regarding major changes in land and facility use and serves all programs and functions on-site as well as the Oak Ridge Operations Office and DOE Headquarters. The Oak Ridge Reservation is a valuable national resource and is managed on the basis of the principles of ecosystem management and sustainable development and how mission, economic, ecological, social, and cultural factors are used to guide land- and facility-use decisions. The long-term goals of the comprehensive integrated planning process, in priority order, are to support DOE critical missions and to stimulate the economy while maintaining a quality environment.

  17. Legacy Management CERCLA Sites. Quality Assurance Project Plan

    Energy Technology Data Exchange (ETDEWEB)

    Riddle, Donna L.

    2007-05-03

    S.M. Stoller Corporation is the contractor for the Technical Assistance Contract (TAC) for the U.S. Department of Energy (DOE) Office of Legacy Management (LM) operations. Stoller employs a management system that applies to all programs, projects, and business management systems funded through DOE-LM task orders. The management system incorporates the philosophy, policies, and requirements of health and safety, environmental compliance, and quality assurance (QA) in all aspects of project planning and implementation. Health and safety requirements are documented in the Health and Safety Manual (STO 2), the Radiological Control Manual (STO 3), the Integrated Safety Management System Description (STO 10), and the Drilling Health and Safety Requirements (STO 14). Environmental compliance policy and requirements are documented in the Environmental Management Program Implementation Manual (STO 11). The QA Program is documented in the Quality Assurance Manual (STO 1). The QA Manual (STO 1) implements the specific requirements and philosophy of DOE Order 414.1C, Quality Assurance. This manual also includes the requirements of other standards that are regularly imposed by customers, regulators, or other DOE orders. Title 10 Code of Federal Regulations Part 830, “Quality Assurance Requirements,” ANSI/ASQC E4-2004, “Quality Systems for Environmental Data and Technology Programs – Requirements with Guidance for Use,” and ISO 14001-2004, “Environmental Management Systems,” have been included. These standards are similar in content. The intent of the QA Manual (STO 1) is to provide a QA management system that incorporates the requirements and philosophy of DOE and other customers within the QA Manual. Criterion 1, “Quality Assurance Program,” identifies the fundamental requirements for establishing and implementing the QA management system; QA Instruction (QAI) 1.1, “QA Program Implementation,” identifies the TAC organizations that have responsibility for

  18. Quality evaluation of processed clay soil samples.

    Science.gov (United States)

    Steiner-Asiedu, Matilda; Harrison, Obed Akwaa; Vuvor, Frederick; Tano-Debrah, Kwaku

    2016-01-01

    This study assessed the microbial quality of clay samples sold on two of the major Ghanaian markets. The study was a cross-sectional assessing the evaluation of processed clay and effects it has on the nutrition of the consumers in the political capital town of Ghana. The items for the examination was processed clay soil samples. Staphylococcus spp and fecal coliforms including Klebsiella, Escherichia, and Shigella and Enterobacterspp were isolated from the clay samples. Samples from the Kaneshie market in Accra recorded the highest total viable counts 6.5 Log cfu/g and Staphylococcal count 5.8 Log cfu/g. For fecal coliforms, Madina market samples had the highest count 6.5 Log cfu/g and also recorded the highest levels of yeast and mould. For Koforidua, total viable count was highest in the samples from the Zongo market 6.3 Log cfu/g. Central market samples had the highest count of fecal coliforms 4.6 Log cfu/g and yeasts and moulds 6.5 Log cfu/g. "Small" market recorded the highest staphylococcal count 6.2 Log cfu/g. The water activity of the clay samples were low, and ranged between 0.65±0.01 and 0.66±0.00 for samples collected from Koforidua and Accra respectively. The clay samples were found to contain Klebsiella spp. Escherichia, Enterobacter, Shigella spp. staphylococcus spp., yeast and mould. These have health implications when consumed.

  19. A quality assurance index for brachytherapy treatment plan verification

    International Nuclear Information System (INIS)

    Simpson, J.B.; Clarke, J.P.

    2000-01-01

    A method is described which provides an independent verification of a brachytherapy treatment plan. The method is applicable to any common geometric configuration and utilises a simple equation derived from a common form of nonlinear regression. The basis for the index value is the relationship between the treatment time, prescribed dose, source strength and plan geometry. This relationship may be described mathematically as: Total Treatment Time ∝ Prescribed Dose/Source Strength x (a geometric term) with the geometric term incorporating three geometric components, namely the distance from source positions to points of dose normalisation (d), the total length of the dwell positions (L), and the number of source trains or catheters (N). A general equation of the form GF = k (d) -α (L) -β (N) -y is used to describe the plan geometry, where GF is what we have termed the geometric factor, k is a constant of proportionality and the exponents are derived from the non-linear regression process. The resulting index is simple to calculate prior to patient treatment and sensitive enough to identify significant error whilst being robust enough to allow for a normal degree of geometric distortion

  20. Quality Assurance Program Plan for the Waste Isolation Pilot Plant Experimental-Waste Characterization Program

    International Nuclear Information System (INIS)

    1991-01-01

    This Quality Assurance Program Plan (QAPP) identifies the quality of data necessary to meet the specific objectives associated with the Department of Energy (DOE) Waste Isolation Pilot Plant (WIPP) Experimental-Waste Characterization Program (the Program). DOE plans to conduct experiments in the WIPP during a Test Phase of approximately 5 years. These experiments will be conducted to reduce the uncertainties associated with the prediction of several processes (e.g., gas generation) that may influence repository performance. The results of the experiments will be used to assess the ability of the WIPP to meet regulatory requirements for the long-term protection of human health and the environment from the disposal of TRU wastes. 37 refs., 25 figs., 18 tabs

  1. PNNL Apatite Investigation at 100-NR-2 Quality Assurance Project Plan

    Energy Technology Data Exchange (ETDEWEB)

    Fix, N. J.

    2009-04-02

    In 2004, the U.S. Department of Energy, Fluor Hanford, Inc., Pacific Northwest National Laboratory (PNNL), and the Washington Department of Ecology agreed that the long-term strategy for groundwater remediation at the 100-N Area would include apatite sequestration as the primary treatment, followed by a secondary treatment if necessary. Since then, the agencies have worked together to agree on which apatite sequestration technology has the greatest chance of reducing strontium-90 flux to the Columbia River. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by staff working on the PNNL Apatite Investigation at 100-NR-2 Project. The plan is designed to be used exclusively by project staff.

  2. Innovation Process Planning Model in the Bpmn Standard

    Directory of Open Access Journals (Sweden)

    Jurczyk-Bunkowska Magdalena

    2013-12-01

    Full Text Available The aim of the article is to show the relations in the innovation process planning model. The relations argued here guarantee the stable and reliable way to achieve the result in the form of an increased competitiveness by a professionally directed development of the company. The manager needs to specify the effect while initiating the realisation of the process, has to be achieved this by the system of indirect goals. The original model proposed here shows the standard of dependence between the plans of the fragments of the innovation process which make up for achieving its final goal. The relation in the present article was shown by using the standard Business Process Model and Notation. This enabled the specification of interrelations between the decision levels at which subsequent fragments of the innovation process are planned. This gives the possibility of a better coordination of the process, reducing the time needed for the achievement of its effect. The model has been compiled on the basis of the practises followed in Polish companies. It is not, however, the reflection of these practises, but rather an idealised standard of proceedings which aims at improving the effectiveness of the management of innovations on the operational level. The model shown could be the basis of the creation of systems supporting the decision making, supporting the knowledge management or those supporting the communication in the innovation processes.

  3. Action plan for the communication process in a nursing team

    Directory of Open Access Journals (Sweden)

    Priscilla Valladares Broca

    2016-06-01

    Full Text Available The objective of this study is to propose an action plan for the communication process in the nursing team. The theoretical references were: the model of a communication process proposed by Berlo and essential concepts of King´s Theory. It is a qualitative, convergent-care research. The data production technique was the semi-structured interview with 25 nurses of a public hospital. Data used the thematic content analysis technique. The elements of the communication team are: perception, self, space, time, stress, role, authority, power, status, audience, empathy and nonverbal communication. The plan proposes a dynamic, flexible, interactive and relational communication process, in order to contribute to the professional qualification and make new practices of care viable. It was concluded that its elements do not have a fixed and stable position, but throughout the process they are used according to the needs of each party.

  4. Application of a B ampersand W developed computer aided pictorial process planning system to CQMS for manufacturing process control

    International Nuclear Information System (INIS)

    Johanson, D.C.; VandeBogart, J.E.

    1992-01-01

    Babcock ampersand Wilcox (B ampersand W) will utilize its internally developed Computer Aided Pictorial Process Planning or CAPPP (pronounced open-quotes cap cubedclose quotes) system to create a paperless manufacturing environment for the Collider Quadruple Magnets (CQM). The CAPPP system consists of networked personal computer hardware and software used to: (1) generate and maintain the documents necessary for product fabrication, (2) communicate the information contained in these documents to the production floor, and (3) obtain quality assurance and manufacturing feedback information from the production floor. The purpose of this paper is to describe the various components of the CAPPP system and explain their applicability to product fabrication, specifically quality assurance functions

  5. Strategic investment of embodied energy during the architectural planning process

    NARCIS (Netherlands)

    Hildebrand, L.

    2014-01-01

    It is an interesting time in the building industry; for more than one decade sustainability is a planning parameter that essentially impacts construction related processes. Reduction of operational energy was initiated after the oil crisis and changed the type of construction by including heat

  6. A Comprehensive Comparison of IMRT and VMAT Plan Quality for Prostate Cancer Treatment

    International Nuclear Information System (INIS)

    Quan, Enzhuo M.; Li Xiaoqiang; Li Yupeng; Wang Xiaochun; Kudchadker, Rajat J.; Johnson, Jennifer L.; Kuban, Deborah A.; Lee, Andrew K.; Zhang Xiaodong

    2012-01-01

    Purpose: We performed a comprehensive comparative study of the plan quality between volumetric-modulated arc therapy (VMAT) and intensity-modulated radiation therapy (IMRT) for the treatment of prostate cancer. Methods and Materials: Eleven patients with prostate cancer treated at our institution were randomly selected for this study. For each patient, a VMAT plan and a series of IMRT plans using an increasing number of beams (8, 12, 16, 20, and 24 beams) were examined. All plans were generated using our in-house–developed automatic inverse planning (AIP) algorithm. An existing eight-beam clinical IMRT plan, which was used to treat the patient, was used as the reference plan. For each patient, all AIP-generated plans were optimized to achieve the same level of planning target volume (PTV) coverage as the reference plan. Plan quality was evaluated by measuring mean dose to and dose–volume statistics of the organs at risk, especially the rectum, from each type of plan. Results: For the same PTV coverage, the AIP-generated VMAT plans had significantly better plan quality in terms of rectum sparing than the eight-beam clinical and AIP-generated IMRT plans (p < 0.0001). However, the differences between the IMRT and VMAT plans in all the dosimetric indices decreased as the number of beams used in IMRT increased. IMRT plan quality was similar or superior to that of VMAT when the number of beams in IMRT was increased to a certain number, which ranged from 12 to 24 for the set of patients studied. The superior VMAT plan quality resulted in approximately 30% more monitor units than the eight-beam IMRT plans, but the delivery time was still less than 3 min. Conclusions: Considering the superior plan quality as well as the delivery efficiency of VMAT compared with that of IMRT, VMAT may be the preferred modality for treating prostate cancer.

  7. 78 FR 7703 - Revisions to the California State Implementation Plan, South Coast Air Quality Management...

    Science.gov (United States)

    2013-02-04

    ... the California State Implementation Plan, South Coast Air Quality Management District, Proposed Rule... approve a revision to the South Coast Air Quality Management District (SCAQMD) portion of the California... digesters. Rule 1127 was designed to implement the 2003 Air Quality Management Plan (AQMP) control measure...

  8. 76 FR 47094 - Revisions to the California State Implementation Plan; South Coast Air Quality Management District

    Science.gov (United States)

    2011-08-04

    ... the California State Implementation Plan; South Coast Air Quality Management District AGENCY... the South Coast Air Quality Management District portion of the California State Implementation Plan... following local rule: South Coast Air Quality Management District Rule 1175, Control of Emissions from the...

  9. 76 FR 30896 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2011-05-27

    ... the California State Implementation Plan, South Coast Air Quality Management District AGENCY... the South Coast Air Quality Management District (SCAQMD) portion of the California State... overwhelmingly formed as a secondary pollutant. (South Coast 2007 Air Quality Management Plan, page ES-9...

  10. Assessment of quality of care in family planning services in Jimma ...

    African Journals Online (AJOL)

    Background: Providing quality of care in family planning services is an important task for care providers so as to increase service utilization and coverage; however, little is known about the existing quality of care in such services. Objective: To assess quality of care in family planning services in Jimma Zone, southwest ...

  11. MO-F-CAMPUS-T-02: An Electronic Whiteboard Platform to Manage Treatment Planning Process

    Energy Technology Data Exchange (ETDEWEB)

    DiCostanzo, D; Woollard, J; Gupta, N; Ayan, A [Ohio State University, Columbus, OH (United States); Thompson, S [Santa Cruz Radiation Oncology, Santa Cruz, CA (United States)

    2015-06-15

    Purpose: In an effort to improve patient safety and streamline the radiotherapy treatment planning (TP) process, a software based whiteboard had been developed and put in use in our facility Methods: The electronic whiteboard developed using SQL database (DB) and PHP/JavaScript based web interface, is published via department intranet and login credentials. The DB stores data for each TP process such as patient information, plan type, simulation/start dates, physician, dosimetrist, QA and the current status in planning process. Users interact with the DB per plan and perform status updates in real time as the planning process progresses. All user interactions with the DB are recorded with timestamps so as to calculate statistical information for TP process management such as contouring times, planning and review times, dosimetry, physics and therapist QA times. External beam and brachytherapy plans are categorized according to complexity (ex: IMRT, 3D, HDR, LDR etc) and treatment types and applicators. Each plan category is assigned specific timelines for each planning process. When a plan approaches or passes the predetermined timeline, users are alerted via color coded graphical cues. When certain process items are not completed in time, pre-determined actions are triggered such as a delay in treatment start date. Results: Our institution has been using the electronic whiteboard for two years. Implementation of pre-determined actions based on the statistical information collected by the whiteboard improved our TP process. For example, the average time for normal tissue contouring decreased from 0.73±1.37 to 0.24±0.33 days. The average time for target volume contouring decreased from 3.2±2.84 to 2.37±2.54 days. This increase in efficiency allows more time for quality assurance processes, improving patient safety. Conclusion: The electronic whiteboard has been an invaluable tool for streamlining our TP processes. It facilitates timely and accurate communication

  12. MO-F-CAMPUS-T-02: An Electronic Whiteboard Platform to Manage Treatment Planning Process

    International Nuclear Information System (INIS)

    DiCostanzo, D; Woollard, J; Gupta, N; Ayan, A; Thompson, S

    2015-01-01

    Purpose: In an effort to improve patient safety and streamline the radiotherapy treatment planning (TP) process, a software based whiteboard had been developed and put in use in our facility Methods: The electronic whiteboard developed using SQL database (DB) and PHP/JavaScript based web interface, is published via department intranet and login credentials. The DB stores data for each TP process such as patient information, plan type, simulation/start dates, physician, dosimetrist, QA and the current status in planning process. Users interact with the DB per plan and perform status updates in real time as the planning process progresses. All user interactions with the DB are recorded with timestamps so as to calculate statistical information for TP process management such as contouring times, planning and review times, dosimetry, physics and therapist QA times. External beam and brachytherapy plans are categorized according to complexity (ex: IMRT, 3D, HDR, LDR etc) and treatment types and applicators. Each plan category is assigned specific timelines for each planning process. When a plan approaches or passes the predetermined timeline, users are alerted via color coded graphical cues. When certain process items are not completed in time, pre-determined actions are triggered such as a delay in treatment start date. Results: Our institution has been using the electronic whiteboard for two years. Implementation of pre-determined actions based on the statistical information collected by the whiteboard improved our TP process. For example, the average time for normal tissue contouring decreased from 0.73±1.37 to 0.24±0.33 days. The average time for target volume contouring decreased from 3.2±2.84 to 2.37±2.54 days. This increase in efficiency allows more time for quality assurance processes, improving patient safety. Conclusion: The electronic whiteboard has been an invaluable tool for streamlining our TP processes. It facilitates timely and accurate communication

  13. Local Authorities Participation in the Tourism Planning Process

    Directory of Open Access Journals (Sweden)

    Ali SELCUK CAN

    2014-02-01

    Full Text Available The aim of this article is to explore the weaknesses and strengths of local authorities in terms of their participation in the tourism planning process in Turkey. A two-page questionnaire was applied, along with structured interviews with 71 administrators of metropolitan, provincial, and district authorities, between January 1 and September 31, 2011. The findings of the survey suggest that tourism planning responsibilities should be devolved to local authorities. Local authorities do not extensively participate in tourism planning at present because of inadequate budgeting and tourism allocation facilities, insufficient cooperation among stakeholders, and a domination of central administration traditions. Causes of insufficient participation in tourism planning statistically differ among local authorities, in terms of insufficient realizations of the importance of tourism planning by stakeholders, and public land allocation for the purpose of tourism. On the other hand, there is a statistically significant difference between local authorities that have a tourism master plan and those who do not, in terms of a lack of educational opportunities for planners.

  14. Quality-assurance plan for water-resources activities of the U.S. Geological Survey in Idaho

    Science.gov (United States)

    Packard, F.A.

    1996-01-01

    To ensure continued confidence in its products, the Water Resources Division of the U.S. Geological Survey implemented a policy that all its scientific work be performed in accordance with a centrally managed quality-assurance program. This report establishes and documents a formal policy for current (1995) quality assurance within the Idaho District of the U.S. Geological Survey. Quality assurance is formalized by describing district organization and operational responsibilities, documenting the district quality-assurance policies, and describing district functions. The districts conducts its work through offices in Boise, Idaho Falls, Twin Falls, Sandpoint, and at the Idaho National Engineering Laboratory. Data-collection programs and interpretive studies are conducted by two operating units, and operational and technical assistance is provided by three support units: (1) Administrative Services advisors provide guidance on various personnel issues and budget functions, (2) computer and reports advisors provide guidance in their fields, and (3) discipline specialists provide technical advice and assistance to the district and to chiefs of various projects. The district's quality-assurance plan is based on an overall policy that provides a framework for defining the precision and accuracy of collected data. The plan is supported by a series of quality-assurance policy statements that describe responsibilities for specific operations in the district's program. The operations are program planning; project planning; project implementation; review and remediation; data collection; equipment calibration and maintenance; data processing and storage; data analysis, synthesis, and interpretation; report preparation and processing; and training. Activities of the district are systematically conducted under a hierarchy of supervision an management that is designed to ensure conformance with Water Resources Division goals quality assurance. The district quality

  15. National Ignition Facility quality assurance plan for laser materials and optical technology

    Energy Technology Data Exchange (ETDEWEB)

    Wolfe, C.R.

    1996-05-01

    Quality achievement is the responsibility of the line organizations of the National Ignition Facility (NIF) Project. This subtier Quality Assurance Plan (QAP) applies to activities of the Laser Materials & Optical Technology (LM&OT) organization and its subcontractors. It responds to the NIF Quality Assurance Program Plan (QAPP, L-15958-2, NIF-95-499) and Department of Energy (DOE) Order 5700.6C. This Plan is organized according to 10 Quality Assurance (QA) criteria and subelements of a management system as outlined in the NIF QAPP. This Plan describes how those QA requirements are met. This Plan is authorized by the Associate Project Leader for the LM&OT organization, who has assigned responsibility to the Optics QA engineer to maintain this plan, with the assistance of the NIF QA organization. This Plan governs quality-affecting activities associated with: design; procurement; fabrication; testing and acceptance; handling and storage; and installation of NIF Project optical components into mounts and subassemblies.

  16. Knowledge-based prediction of plan quality metrics in intracranial stereotactic radiosurgery

    International Nuclear Information System (INIS)

    Shiraishi, Satomi; Moore, Kevin L.; Tan, Jun; Olsen, Lindsey A.

    2015-01-01

    Purpose: The objective of this work was to develop a comprehensive knowledge-based methodology for predicting achievable dose–volume histograms (DVHs) and highly precise DVH-based quality metrics (QMs) in stereotactic radiosurgery/radiotherapy (SRS/SRT) plans. Accurate QM estimation can identify suboptimal treatment plans and provide target optimization objectives to standardize and improve treatment planning. Methods: Correlating observed dose as it relates to the geometric relationship of organs-at-risk (OARs) to planning target volumes (PTVs) yields mathematical models to predict achievable DVHs. In SRS, DVH-based QMs such as brain V 10Gy (volume receiving 10 Gy or more), gradient measure (GM), and conformity index (CI) are used to evaluate plan quality. This study encompasses 223 linear accelerator-based SRS/SRT treatment plans (SRS plans) using volumetric-modulated arc therapy (VMAT), representing 95% of the institution’s VMAT radiosurgery load from the past four and a half years. Unfiltered models that use all available plans for the model training were built for each category with a stratification scheme based on target and OAR characteristics determined emergently through initial modeling process. Model predictive accuracy is measured by the mean and standard deviation of the difference between clinical and predicted QMs, δQM = QM clin − QM pred , and a coefficient of determination, R 2 . For categories with a large number of plans, refined models are constructed by automatic elimination of suspected suboptimal plans from the training set. Using the refined model as a presumed achievable standard, potentially suboptimal plans are identified. Predictions of QM improvement are validated via standardized replanning of 20 suspected suboptimal plans based on dosimetric predictions. The significance of the QM improvement is evaluated using the Wilcoxon signed rank test. Results: The most accurate predictions are obtained when plans are stratified based on

  17. Knowledge-based prediction of plan quality metrics in intracranial stereotactic radiosurgery

    Energy Technology Data Exchange (ETDEWEB)

    Shiraishi, Satomi; Moore, Kevin L., E-mail: kevinmoore@ucsd.edu [Department of Radiation Medicine and Applied Sciences, University of California, San Diego, La Jolla, California 92093 (United States); Tan, Jun [Department of Radiation Oncology, UT Southwestern Medical Center, Dallas, Texas 75490 (United States); Olsen, Lindsey A. [Department of Radiation Oncology, Washington University School of Medicine, St. Louis, Missouri 63110 (United States)

    2015-02-15

    Purpose: The objective of this work was to develop a comprehensive knowledge-based methodology for predicting achievable dose–volume histograms (DVHs) and highly precise DVH-based quality metrics (QMs) in stereotactic radiosurgery/radiotherapy (SRS/SRT) plans. Accurate QM estimation can identify suboptimal treatment plans and provide target optimization objectives to standardize and improve treatment planning. Methods: Correlating observed dose as it relates to the geometric relationship of organs-at-risk (OARs) to planning target volumes (PTVs) yields mathematical models to predict achievable DVHs. In SRS, DVH-based QMs such as brain V{sub 10Gy} (volume receiving 10 Gy or more), gradient measure (GM), and conformity index (CI) are used to evaluate plan quality. This study encompasses 223 linear accelerator-based SRS/SRT treatment plans (SRS plans) using volumetric-modulated arc therapy (VMAT), representing 95% of the institution’s VMAT radiosurgery load from the past four and a half years. Unfiltered models that use all available plans for the model training were built for each category with a stratification scheme based on target and OAR characteristics determined emergently through initial modeling process. Model predictive accuracy is measured by the mean and standard deviation of the difference between clinical and predicted QMs, δQM = QM{sub clin} − QM{sub pred}, and a coefficient of determination, R{sup 2}. For categories with a large number of plans, refined models are constructed by automatic elimination of suspected suboptimal plans from the training set. Using the refined model as a presumed achievable standard, potentially suboptimal plans are identified. Predictions of QM improvement are validated via standardized replanning of 20 suspected suboptimal plans based on dosimetric predictions. The significance of the QM improvement is evaluated using the Wilcoxon signed rank test. Results: The most accurate predictions are obtained when plans are

  18. 76 FR 68381 - Approval and Promulgation of Air Quality Implementation Plans; Pennsylvania; Pennsylvania Clean...

    Science.gov (United States)

    2011-11-04

    ... Promulgation of Air Quality Implementation Plans; Pennsylvania; Pennsylvania Clean Vehicles Program AGENCY... Implementation Plan (SIP) revision submitted by the Commonwealth of Pennsylvania. This SIP revision contains Pennsylvania's Clean Vehicle Program, which adopts California's second generation low emission vehicle program...

  19. Final Hanford Site Transuranic (TRU) Waste Characterization Quality Assurance Project Plan

    International Nuclear Information System (INIS)

    GREAGER, T.M.

    1999-01-01

    The Transuranic Waste Characterization Quality Assurance Program Plan required each US Department of Energy (DOE) site that characterizes transuranic waste to be sent the Waste Isolation Pilot Plan that addresses applicable requirements specified in the QAPP

  20. Patient geometry-driven information retrieval for IMRT treatment plan quality control

    International Nuclear Information System (INIS)

    Wu Binbin; Ricchetti, Francesco; Sanguineti, Giuseppe; Kazhdan, Misha; Simari, Patricio; Chuang Ming; Taylor, Russell; Jacques, Robert; McNutt, Todd

    2009-01-01

    Purpose: Intensity modulated radiation therapy (IMRT) treatment plan quality depends on the planner's level of experience and the amount of time the planner invests in developing the plan. Planners often unwittingly accept plans when further sparing of the organs at risk (OARs) is possible. The authors propose a method of IMRT treatment plan quality control that helps planners to evaluate the doses of the OARs upon completion of a new plan. Methods: It is achieved by comparing the geometric configurations of the OARs and targets of a new patient with those of prior patients, whose plans are maintained in a database. They introduce the concept of a shape relationship descriptor and, specifically, the overlap volume histogram (OVH) to describe the spatial configuration of an OAR with respect to a target. The OVH provides a way to infer the likely DVHs of the OARs by comparing the relative spatial configurations between patients. A database of prior patients is built to serve as an external reference. At the conclusion of a new plan, planners search through the database and identify related patients by comparing the OAR-target geometric relationships of the new patient with those of prior patients. The treatment plans of these related patients are retrieved from the database and guide planners in determining whether lower doses delivered to the OARs in the new plan are feasible. Results: Preliminary evaluation is promising. In this evaluation, they applied the analysis to the parotid DVHs of 32 prior head-and-neck patients, whose plans are maintained in a database. Each parotid was queried against the other 63 parotids to determine whether a lower dose was possible. The 17 parotids that promised the greatest reduction in D 50 (DVH dose at 50% volume) were flagged. These 17 parotids came from 13 patients. The method also indicated that the doses of the other nine parotids of the 13 patients could not be reduced, so they were included in the replanning process as

  1. Chip Design Process Optimization Based on Design Quality Assessment

    Science.gov (United States)

    Häusler, Stefan; Blaschke, Jana; Sebeke, Christian; Rosenstiel, Wolfgang; Hahn, Axel

    2010-06-01

    Nowadays, the managing of product development projects is increasingly challenging. Especially the IC design of ASICs with both analog and digital components (mixed-signal design) is becoming more and more complex, while the time-to-market window narrows at the same time. Still, high quality standards must be fulfilled. Projects and their status are becoming less transparent due to this complexity. This makes the planning and execution of projects rather difficult. Therefore, there is a need for efficient project control. A main challenge is the objective evaluation of the current development status. Are all requirements successfully verified? Are all intermediate goals achieved? Companies often develop special solutions that are not reusable in other projects. This makes the quality measurement process itself less efficient and produces too much overhead. The method proposed in this paper is a contribution to solve these issues. It is applied at a German design house for analog mixed-signal IC design. This paper presents the results of a case study and introduces an optimized project scheduling on the basis of quality assessment results.

  2. Implementation Of Quality Management System For Irradiation Processing Services

    Science.gov (United States)

    Lungu, Ion-Bogdan; Manea, Maria-Mihaela

    2015-07-01

    In today's market, due to an increasing competitiveness, quality management has set itself as an indispensable tool and a reference point for every business. It is ultimately focused on customer satisfaction which is a stringent factor for every business. Implementing and maintaining a QMS is a rather difficult, time consuming and expensive process which must be done with respect of many factors. The aim of this paper is to present a case study for implementing QMS ISO 9001 in a gamma irradiation treatment service provider. The research goals are the identification of key benefits, reasons, advantages, disadvantages, drawbacks etc for a successful QMS implementation and use. Finally, the expected results focus on creating a general framework for implementing an efficient QMS plan that can be easily adapted to other kind of services and markets.

  3. Strategic Planning Process and Organizational Structure: Impacts, Confluence and Similarities

    Directory of Open Access Journals (Sweden)

    Dyogo Felype Neis

    2017-01-01

    Full Text Available This article aims to analyze the relationship between the strategic planning process and organizational structure in the reality of a complex organization: the Public Prosecutor’s Office of Santa Catarina (MPSC. The research is set by the single case study research strategy and data were collected through the following instruments: bibliographical research, documentary research, semi-structured interviews and systematic observation. The conclusion indicates that the phases of the strategic planning process influence and are influenced by the elements of the organizational structure and highlights the confluences, the impacts and similarities between the stages of formulation and implementation of the strategic process with the various constituent elements of the organizational structure.

  4. Standardization of quality control plans for highway bridges in Europe: COST Action TU 1406

    Science.gov (United States)

    Casas, Joan R.; Matos, Jose Campos e.

    2017-09-01

    In Europe, as all over the world, the need to manage roadway bridges in an efficient way led to the development of different management systems. Hence, nowadays, many European countries have their own system. Although they present a similar architectural framework, several differences can be appointed. These differences constitute a divergent mechanism that may conduct to different decisions on maintenance actions. Within the roadway bridge management process, the identification of maintenance needs is more effective when developed in a uniform and repeatable manner. This process can be accomplished by the identification of performance indicators and definition of performance goals and key performance indicators (KPI), improving the planning of maintenance strategies. Therefore, a discussion at a European level, seeking to achieve a standardized approach in this subject, will bring significant benefits. Accordingly, a COST Action is under way in Europe with the aim of standardizing the establishment of quality control plans for roadway bridges.

  5. The quality of paper-based versus electronic nursing care plan in Australian aged care homes: A documentation audit study.

    Science.gov (United States)

    Wang, Ning; Yu, Ping; Hailey, David

    2015-08-01

    The nursing care plan plays an essential role in supporting care provision in Australian aged care. The implementation of electronic systems in aged care homes was anticipated to improve documentation quality. Standardized nursing terminologies, developed to improve communication and advance the nursing profession, are not required in aged care practice. The language used by nurses in the nursing care plan and the effect of the electronic system on documentation quality in residential aged care need to be investigated. To describe documentation practice for the nursing care plan in Australian residential aged care homes and to compare the quantity and quality of documentation in paper-based and electronic nursing care plans. A nursing documentation audit was conducted in seven residential aged care homes in Australia. One hundred and eleven paper-based and 194 electronic nursing care plans, conveniently selected, were reviewed. The quantity of documentation in a care plan was determined by the number of phrases describing a resident problem and the number of goals and interventions. The quality of documentation was measured using 16 relevant questions in an instrument developed for the study. There was a tendency to omit 'nursing problem' or 'nursing diagnosis' in the nursing process by changing these terms (used in the paper-based care plan) to 'observation' in the electronic version. The electronic nursing care plan documented more signs and symptoms of resident problems and evaluation of care than the paper-based format (48.30 vs. 47.34 out of 60, Ppaper-based system (Ppaper-based system. Omission of the nursing problem or diagnosis from the nursing process may reflect a range of factors behind the practice that need to be understood. Further work is also needed on qualitative aspects of the nurse care plan, nurses' attitudes towards standardized terminologies and the effect of different documentation practice on care quality and resident outcomes. Copyright

  6. 77 FR 12673 - Approval of Air Quality Implementation Plans; California; South Coast; Attainment Plan for 1997 8...

    Science.gov (United States)

    2012-03-01

    ..., Douglas Ito, Chief, Air Quality and Transportation Planning Branch; California Air Resources Board... District determine compliance with the ``global commitment'' target, thus leaving them in a situation faced... plans, after consultation with the operators adopt ridership increase target for 1983-1987. Emission...

  7. The Operational Planning Model of Transhipment Processes in the Port

    Directory of Open Access Journals (Sweden)

    Mia Jurjević

    2016-04-01

    Full Text Available Modelling of a traffic system refers to the efficiency of operations for establishing successful business performance by examining the possibilities for its improvement. The main purpose of each container terminal is to ensure continuity and dynamics of the flow of containers. The objective of this paper is to present a method for determining the amount of certain types of containers that can be transhipped at each berth, with the proper cargo handling, taking into account minimum total costs of transhipment. The mathematical model of planning the transhipment and transportation of containers at the terminal is presented. The optimal solution, obtained with the method of linear programming, represents a plan for container deployment that will ensure effective ongoing process of transhipment, providing the lowest transhipment costs. The proposed model, tested in the port of Rijeka, should be the basis for makingadequate business decisions in the operational planning of the container terminal.

  8. 76 FR 40262 - Determination of Attainment, Approval and Promulgation of Air Quality Implementation Plans...

    Science.gov (United States)

    2011-07-08

    ... Ambient Air Quality Standard (NAAQS). This action corrects an omission in the regulatory text of the.... FOR FURTHER INFORMATION CONTACT: Edward Doty, Environmental Scientist, Attainment Planning and...

  9. Compass model-based quality assurance for stereotactic VMAT treatment plans.

    Science.gov (United States)

    Valve, Assi; Keyriläinen, Jani; Kulmala, Jarmo

    2017-12-01

    To use Compass as a model-based quality assurance (QA) tool for stereotactic body radiation therapy (SBRT) and stereotactic radiation therapy (SRT) volumetric modulated arc therapy (VMAT) treatment plans calculated with Eclipse treatment planning system (TPS). Twenty clinical stereotactic VMAT SBRT and SRT treatment plans were blindly selected for evaluation. Those plans included four different treatment sites: prostate, brain, lung and body. The plans were evaluated against dose-volume histogram (DVH) parameters and 2D and 3D gamma analysis. The dose calculated with Eclipse treatment planning system (TPS) was compared to Compass calculated dose (CCD) and Compass reconstructed dose (CRD). The maximum differences in mean dose of planning target volume (PTV) were 2.7 ± 1.0% between AAA and Acuros XB calculation algorithm TPS dose, -7.6 ± 3.5% between Eclipse TPS dose and CCD dose and -5.9 ± 3.7% between Eclipse TPS dose and CRD dose for both Eclipse calculation algorithms, respectively. 2D gamma analysis was not able to identify all the cases that 3D gamma analysis specified for further verification. Compass is suitable for QA of SBRT and SRT treatment plans. However, the QA process should include wide set of DVH-based dose parameters and 3D gamma analysis should be the preferred method when performing clinical patient QA. The results suggest that the Compass should not be used for smaller field sizes than 3 × 3 cm 2 or the beam model should be adjusted separately for both small (FS ≤ 3 cm) and large (FS > 3 cm) field sizes. Copyright © 2017 Associazione Italiana di Fisica Medica. Published by Elsevier Ltd. All rights reserved.

  10. Application of Data Quality Objectives in Decommissioning Plans

    International Nuclear Information System (INIS)

    Duvall, Ken

    2008-01-01

    The Data Quality Objectives (DQOs) are applicable and relevant in the design of measurements that provide data for good, effective decision-making. The DQOs provide criteria for the design of measurements and provide a target for assessing the level of data quality that is considered acceptable for effective decision-making. Such targets in the design of measurements help eliminate the acquisition of unnecessary, duplicative or overly precise data. They help provide more efficient use of limited measurement resources. With the application of DQOs, D and D program decisions are identified, DQOs are established, and measurements are designed to provide data that meet the DQOs for each decision point. Since the Historical Site Assessment (HSA), Scoping, Characterization, and Remedial Action Surveys provide data and information to all D and D program decision-making, an integrated approach should be taken where all input requirements are considered, in the design of each survey. The decision points and their linkages form a network of decisions referred to as a decision framework. Since distinct D and D program functions are linked by their decisions, programs proceed through the decision framework, in a uniform fashion, to one endpoint, the decision to release the site. The decision to release the site is based on the ability to pass the Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM). Therefore, D and D planning has a primary aim, to integrate D and D program efforts in a manner that will allow D and D decision-making to reach one end point, effective MARSSIM decision-making. The Decision Framework is best represented, schematically, by a decision tree. The decision tree is based on 3- decision points and represents a decision in each of the Remediation, Dose Assessment and MARSSIM program functions. The decisions address the extent of excavation, dose modeling approach, and sampling for the MARSSIM Final Status Survey (FSS). The simplified

  11. Image processing system performance prediction and product quality evaluation

    Science.gov (United States)

    Stein, E. K.; Hammill, H. B. (Principal Investigator)

    1976-01-01

    The author has identified the following significant results. A new technique for image processing system performance prediction and product quality evaluation was developed. It was entirely objective, quantitative, and general, and should prove useful in system design and quality control. The technique and its application to determination of quality control procedures for the Earth Resources Technology Satellite NASA Data Processing Facility are described.

  12. Influence Business Process On The Quality Of Accounting Information System

    OpenAIRE

    Meiryani; Muhammad Syaifullah

    2015-01-01

    Abstract The purpose of this study was to determine the influence of business process to the quality of the accounting information system. This study aims to examine the influence of business process on the quality of the information system of accounting information system. The study was theoritical research which considered the roles of business process on quality of accounting information system which use secondary data collection. The results showed that the business process have a signifi...

  13. External quality measurements reveal internal processes

    NARCIS (Netherlands)

    Schouten, R.E.; Costa, J.M.; Kooten, van O.

    2003-01-01

    With the present developments in CA technology it becomes possible to fine tune the storage conditions to the specific needs of the product. This generates the need to know the exact quality conditions of the product before storage starts. By measuring the initial quality we can determine these

  14. [Evaluation of the sponsoring initiative of the "action plan healthy life-style and life worlds" - instruments and first results on planning quality].

    Science.gov (United States)

    Gerken, U; Schaefer, I; Mühlbach, A; Gebhardt, B; Elias, G M; Kolip, P

    2012-02-01

    In line with the National Action Plan "IN FORM" the German Federal Ministry of Health funds the establishment of 11 regional community health promotion networks (alliances). To meet quality development standards, an external evaluation project has been established in addition to the alliances' internal evaluation. Scientific monitoring focuses on alliance-spanning investigation of quality of planning, structures and processes and uses different methods and instruments (e.g., guided interviews, analytical framework, Goal Attainment Scaling). Regional networks also receive support for their efforts to quality development. Up to now concluding analysis can be done on aspects of planning quality based on findings of the analytical framework developed within the project. 5 selected results presented in the article reveal a heterogeneous picture: on one hand the standard on which the alliances' rationales on demands justifying the project's strategy are written at is very encouraging. The situation is similar with the descriptions of the work planning and statements concerning the sustainability at which the implemented activities are aimed. On the other hand, in explaination criteria like consideration of target group's needs or definition of goals the possibilities are not exhausted yet considering the state of the debate. Hence in similar future projects there is a clear necessity of assistance in approaching these aspects, provided preferably in an early stage of the planning phase. © Georg Thieme Verlag KG Stuttgart · New York.

  15. Factors Determining Quality of Care in Family Planning Services in Africa: A Systematic Review of Mixed Evidence.

    Science.gov (United States)

    Tessema, Gizachew Assefa; Streak Gomersall, Judith; Mahmood, Mohammad Afzal; Laurence, Caroline O

    2016-01-01

    Improving use of family planning services is key to improving maternal health in Africa, and provision of quality of care in family planning services is critical to support higher levels of contraceptive uptake. The objective of this systematic review was to synthesize the available evidence on factors determining the quality of care in family planning services in Africa. Quantitative and qualitative studies undertaken in Africa, published in English, in grey and commercial literature, between 1990 and 2015 were considered. Methodological quality of included studies was assessed using standardized tools. Findings from the quantitative studies were summarized using narrative and tables. Client satisfaction was used to assess the quality of care in family planning services in the quantitative component of the review. Meta-aggregation was used to synthesize the qualitative study findings. From 4334 records, 11 studies (eight quantitative, three qualitative) met the review eligibility criteria. The review found that quality of care was influenced by client, provider and facility factors, and structural and process aspects of the facilities. Client's waiting time, provider competency, provision/prescription of injectable methods, maintaining privacy and confidentiality were the most commonly identified process factors. The quality of stock inventory was the most commonly identified structural factor. The quality of care was also positively associated with privately-owned facilities. The qualitative synthesis revealed additional factors including access related factors such as 'pre-requisites to be fulfilled by the clients and cost of services, provider workload, and providers' behaviour. There is limited evidence on factors determining quality of care in family planning services in Africa that shows quality of care is influenced by multiple factors. The evidence suggests that lowering access barriers and avoiding unnecessary pre-requisites for taking contraceptive

  16. Factors Determining Quality of Care in Family Planning Services in Africa: A Systematic Review of Mixed Evidence.

    Directory of Open Access Journals (Sweden)

    Gizachew Assefa Tessema

    Full Text Available Improving use of family planning services is key to improving maternal health in Africa, and provision of quality of care in family planning services is critical to support higher levels of contraceptive uptake. The objective of this systematic review was to synthesize the available evidence on factors determining the quality of care in family planning services in Africa.Quantitative and qualitative studies undertaken in Africa, published in English, in grey and commercial literature, between 1990 and 2015 were considered. Methodological quality of included studies was assessed using standardized tools. Findings from the quantitative studies were summarized using narrative and tables. Client satisfaction was used to assess the quality of care in family planning services in the quantitative component of the review. Meta-aggregation was used to synthesize the qualitative study findings.From 4334 records, 11 studies (eight quantitative, three qualitative met the review eligibility criteria. The review found that quality of care was influenced by client, provider and facility factors, and structural and process aspects of the facilities. Client's waiting time, provider competency, provision/prescription of injectable methods, maintaining privacy and confidentiality were the most commonly identified process factors. The quality of stock inventory was the most commonly identified structural factor. The quality of care was also positively associated with privately-owned facilities. The qualitative synthesis revealed additional factors including access related factors such as 'pre-requisites to be fulfilled by the clients and cost of services, provider workload, and providers' behaviour.There is limited evidence on factors determining quality of care in family planning services in Africa that shows quality of care is influenced by multiple factors. The evidence suggests that lowering access barriers and avoiding unnecessary pre-requisites for taking

  17. Quality Assurance program plan - plutonium stabilization and handling project W-460

    International Nuclear Information System (INIS)

    SCHULTZ, J.W.

    1999-01-01

    This Quality Assurance Program Plan (QAPP) identifies Project Quality Assurance (QA) program requirements for all parties participating in the design, procurement, demolition, construction, installation, inspection and testing for Project W-460

  18. Gulf of Mexico dissolved oxygen model (GoMDOM) research and quality assurance project plan

    Science.gov (United States)

    An integrated high resolution mathematical modeling framework is being developed that will link hydrodynamic, atmospheric, and water quality models for the northern Gulf of Mexico. This Research and Quality Assurance Project Plan primarily focuses on the deterministic Gulf of Me...

  19. 76 FR 53853 - Approval and Promulgation of Implementation Plans and Designation of Areas for Air Quality...

    Science.gov (United States)

    2011-08-30

    ... Action Network (LEAN) v. EPA, No. 02-60991). The issues raised concerned EPA's decision to approve... Ambient Air Quality Standard,'' Memorandum from John S. Seitz, Director, Office of Air Quality Planning...

  20. Integrate Product Planning Process of OKP Companies in the Cloud Manufacturing Environment

    OpenAIRE

    Zheng , Pai; Xu , Xun; Xie , Sheng ,

    2015-01-01

    Part 8: Cloud-Based Manufacturing; International audience; In today’s competitive market, OKP companies operate in the “engineer-to-order” business mode, whereby analysing the “voice of customer” promptly and accurately in the early design stage determines the success of product development. However, OKP companies have limited resources. They may not be able to afford the cost of the complicated Quality Function Deployment (QFD) product planning process, nor can they obtain abundant CRs infor...

  1. An anticipatory quality improvement process for curricular reform.

    Science.gov (United States)

    Hollander, Harry; Loeser, Helen; Irby, David

    2002-09-01

    standardized set of questions; and examined course schedules, cases, and detailed learning objectives for particular sessions. In July 2001, the committee reported back to the deans with specific recommendations for coordinating the block courses, and about the success in creating integration and the overall balance of topics students would learn. Specific recommendations included increasing the use of pediatric and geriatric cases across courses, creating a case database, developing explicit plans to relocate uncovered material in the four-year curriculum, and bolstering participation of clinical faculty during the first-year blocks. These recommendations were then presented to and endorsed by the Essential Core Steering Committee, which implemented an action plan prior to the September 2001 start date. This proactive approach to quality improvement added an evaluation point before the new curriculum was actually unveiled. The anticipatory planning process substantially aided the interdisciplinary developmental process, increased input into the first-year curriculum by clerkship directors, and identified problems that would have otherwise become apparent after implementation. We believe this model adds value to the curriculum planning process.

  2. Use of focus groups in a library's strategic planning process.

    Science.gov (United States)

    Higa-Moore, Mori Lou; Bunnett, Brian; Mayo, Helen G; Olney, Cynthia A

    2002-01-01

    The use of focus groups to determine patron satisfaction with library resources and services is extensive and well established. This article demonstrates how focus groups can also be used to help shape the future direction of a library as part of the strategic planning process. By responding to questions about their long-term library and information needs, focus group participants at the University of Texas Southwestern Medical Center at Dallas Library contributed an abundance of qualitative patron data that was previously lacking from this process. The selection and recruitment of these patrons is discussed along with the line of questioning used in the various focus group sessions. Of special interest is the way the authors utilized these sessions to mobilize and involve the staff in creating the library's strategic plan. This was accomplished not only by having staff members participate in one of the sessions but also by sharing the project's major findings with them and instructing them in how these findings related to the library's future. The authors' experience demonstrates that focus groups are an effective strategic planning tool for libraries and emphasizes the need to share information broadly, if active involvement of the staff is desired in both the development and implementation of the library's strategic plan.

  3. A quality-refinement process for medical imaging applications.

    Science.gov (United States)

    Neuhaus, J; Maleike, D; Nolden, M; Kenngott, H-G; Meinzer, H-P; Wolf, I

    2009-01-01

    To introduce and evaluate a process for refinement of software quality that is suitable to research groups. In order to avoid constraining researchers too much, the quality improvement process has to be designed carefully. The scope of this paper is to present and evaluate a process to advance quality aspects of existing research prototypes in order to make them ready for initial clinical studies. The proposed process is tailored for research environments and therefore more lightweight than traditional quality management processes. Focus on quality criteria that are important at the given stage of the software life cycle. Usage of tools that automate aspects of the process is emphasized. To evaluate the additional effort that comes along with the process, it was exemplarily applied for eight prototypical software modules for medical image processing. The introduced process has been applied to improve the quality of all prototypes so that they could be successfully used in clinical studies. The quality refinement yielded an average of 13 person days of additional effort per project. Overall, 107 bugs were found and resolved by applying the process. Careful selection of quality criteria and the usage of automated process tools lead to a lightweight quality refinement process suitable for scientific research groups that can be applied to ensure a successful transfer of technical software prototypes into clinical research workflows.

  4. Process-Based Quality (PBQ) Tools Development; TOPICAL

    International Nuclear Information System (INIS)

    Cummins, J.L.

    2001-01-01

    The objective of this effort is to benchmark the development of process-based quality tools for application in CAD (computer-aided design) model-based applications. The processes of interest are design, manufacturing, and quality process applications. A study was commissioned addressing the impact, current technologies, and known problem areas in application of 3D MCAD (3-dimensional mechanical computer-aided design) models and model integrity on downstream manufacturing and quality processes. The downstream manufacturing and product quality processes are profoundly influenced and dependent on model quality and modeling process integrity. The goal is to illustrate and expedite the modeling and downstream model-based technologies for available or conceptual methods and tools to achieve maximum economic advantage and advance process-based quality concepts

  5. Software quality assurance plan for the National Ignition Facility integrated computer control system

    International Nuclear Information System (INIS)

    Woodruff, J.

    1996-11-01

    Quality achievement is the responsibility of the line organizations of the National Ignition Facility (NIF) Project. This Software Quality Assurance Plan (SQAP) applies to the activities of the Integrated Computer Control System (ICCS) organization and its subcontractors. The Plan describes the activities implemented by the ICCS section to achieve quality in the NIF Project's controls software and implements the NIF Quality Assurance Program Plan (QAPP, NIF-95-499, L-15958-2) and the Department of Energy's (DOE's) Order 5700.6C. This SQAP governs the quality affecting activities associated with developing and deploying all control system software during the life cycle of the NIF Project

  6. Quality assurance FY 1995 site support program plan WBS 6.7.2.5

    Energy Technology Data Exchange (ETDEWEB)

    Dell, L.D.

    1994-09-01

    This report is a summary of the quality assurance plan and program for the Westinghouse Hanford Company. The quality assurance plan verifies that the appropriate quality assurance programs and controls are applied to activities that affect quality related to work in: waste management; environmental activities (restoration, remediation, and monitoring); implementation of environmental, state, local, and federal regulations; tri-party agreement activities; facility operation and deactivation/transition to shutdown; new facility construction and operation.

  7. Quality assurance FY 1995 site support program plan WBS 6.7.2.5

    International Nuclear Information System (INIS)

    Dell, L.D.

    1994-09-01

    This report is a summary of the quality assurance plan and program for the Westinghouse Hanford Company. The quality assurance plan verifies that the appropriate quality assurance programs and controls are applied to activities that affect quality related to work in: waste management; environmental activities (restoration, remediation, and monitoring); implementation of environmental, state, local, and federal regulations; tri-party agreement activities; facility operation and deactivation/transition to shutdown; new facility construction and operation

  8. The software improvement process - tools and rules to encourage quality

    International Nuclear Information System (INIS)

    Sigerud, K.; Baggiolini, V.

    2012-01-01

    The Applications section of the CERN accelerator controls group has decided to apply a systematic approach to quality assurance (QA), the 'Software Improvement Process' - SIP. This process focuses on three areas: the development process itself, suitable QA tools, and how to practically encourage developers to do QA. For each stage of the development process we have agreed on the recommended activities and deliverables, and identified tools to automate and support the task. For example we do more code reviews. As peer reviews are resource intensive, we only do them for complex parts of a product. As a complement, we are using static code checking tools, like FindBugs and Checkstyle. We also encourage unit testing and have agreed on a minimum level of test coverage recommended for all products, measured using Clover. Each of these tools is well integrated with our IDE (Eclipse) and give instant feedback to the developer about the quality of their code. The major challenges of SIP have been to 1) agree on common standards and configurations, for example common code formatting and Javadoc documentation guidelines, and 2) how to encourage the developers to do QA. To address the second point, we have successfully implemented 'SIP days', i.e. one day dedicated to QA work to which the whole group of developers participates, and 'Top/Flop' lists, clearly indicating the best and worst products with regards to SIP guidelines and standards, for example test coverage. This paper presents the SIP initiative in more detail, summarizing our experience since two years and our future plans. (authors)

  9. ISO 9001 2000 : the quality management process

    CERN Document Server

    Tricker, Ray

    2006-01-01

    With the publication of ISO 9001:2000, there is now a single quality management ?requirements? standard that is applicable to all organisations, products and services. ISO 9001:2000 is the only standard that can be used for the certification of a QMS and its generic requirements can be used by any organisation.ISO 9001:2000 applies to all types or organisations. It is the quality standard which specifies the requirements of quality management systems for use where organisations need to demonstrate their capability to provide products and services which meet both customer needs and relevant reg

  10. Evaluating which plan quality metrics are appropriate for use in lung SBRT.

    Science.gov (United States)

    Yaparpalvi, Ravindra; Garg, Madhur K; Shen, Jin; Bodner, William R; Mynampati, Dinesh K; Gafar, Aleiya; Kuo, Hsiang-Chi; Basavatia, Amar K; Ohri, Nitin; Hong, Linda X; Kalnicki, Shalom; Tome, Wolfgang A

    2018-02-01

    Several dose metrics in the categories-homogeneity, coverage, conformity and gradient have been proposed in literature for evaluating treatment plan quality. In this study, we applied these metrics to characterize and identify the plan quality metrics that would merit plan quality assessment in lung stereotactic body radiation therapy (SBRT) dose distributions. Treatment plans of 90 lung SBRT patients, comprising 91 targets, treated in our institution were retrospectively reviewed. Dose calculations were performed using anisotropic analytical algorithm (AAA) with heterogeneity correction. A literature review on published plan quality metrics in the categories-coverage, homogeneity, conformity and gradient was performed. For each patient, using dose-volume histogram data, plan quality metric values were quantified and analysed. For the study, the radiation therapy oncology group (RTOG) defined plan quality metrics were: coverage (0.90 ± 0.08); homogeneity (1.27 ± 0.07); conformity (1.03 ± 0.07) and gradient (4.40 ± 0.80). Geometric conformity strongly correlated with conformity index (p plan quality guidelines-coverage % (ICRU 62), conformity (CN or CI Paddick ) and gradient (R 50% ). Furthermore, we strongly recommend that RTOG lung SBRT protocols adopt either CN or CI Padddick in place of prescription isodose to target volume ratio for conformity index evaluation. Advances in knowledge: Our study metrics are valuable tools for establishing lung SBRT plan quality guidelines.

  11. How do environmental policies fit within larger strategic planning processes

    OpenAIRE

    Crowe, Lynn

    2015-01-01

    This chapter explores how environmental policies fit within larger strategic processes relevant to sport management and development. It identifies key policy areas such as environmental impact assessment, sustainable land use planning, environmental protection and visitor impact management. Good practice and guidelines which will enable sport managers to integrate their work with these environmental policies are explored. Detailed guidance on design and longer term management and maintenance ...

  12. Strategic planning applied to quality in asthma management for children.

    Science.gov (United States)

    Goonan, K J; Healy, J M; Jordan, H S; Zazzali, J L; Horowitz, M

    1993-01-01

    This strategic plan translates the HCHP vision statement into a working plan for one major clinical condition--asthma in children. It is a working plan for clinicians and managers across specialties and levels. The results of the projects will improve in a measurable way significant clinical practice and outcomes, in keeping with the FY 1993 strategic goals.

  13. 78 FR 63929 - Approval and Promulgation of Air Quality Implementation Plans; Texas; Revisions to Rules and...

    Science.gov (United States)

    2013-10-25

    ... requirements for grandfathered facilities. The revisions will contribute to improvement in overall air quality... to contribute to improvement of air quality and attainment or maintenance of the federal air quality...] Approval and Promulgation of Air Quality Implementation Plans; Texas; Revisions to Rules and Regulations...

  14. Investors' perspective and needs in the process of developing a business plan

    Directory of Open Access Journals (Sweden)

    Stankov Biljana

    2015-01-01

    Full Text Available A business plan is a very important written document about the current state and future intentions of the company and it meets the information and other needs of a wide range of users, regardless of the size of the company and its organizational structure, or belonging to particular economic activity; regardless of the stage of the life cycle in which the company is located and the like . A business plan is written by the existing, established companies for different needs as well as by startup companies that are eager to show the profitability of the business venture and the success of business ideas realization. The business plan often stands out as a means to establish initial communication between entrepreneurs and financing sources, as well as for their initial meeting. The research problem relates to highlighting the business plan as a very powerful means in the hands of entrepreneurs in applying for obtaining the necessary financial resources. The subject of the research includes the analysis of the differences between the many users of a business plan with an emphasis on commercial banks, investment funds and private investors, as financiers of the business venture and the most important users. The aim of the research relates to highlighting the needs of investors and appreciation of their perspectives in the process of developing a business plan, because without a quality business plan investor is at risk of unsafe moving through a very uncertain and changing environment.

  15. Effect of Processing on the Quality of Pineapple Juice

    NARCIS (Netherlands)

    Hounhouigan, M.H.; Linnemann, A.R.; Soumanou, M.M.; Boekel, van M.A.J.S.

    2014-01-01

    Pineapple processing plays an important role in juice preservation. Because the quality of the pineapple juice is affected by the processing technology applied, the effects of pasteurization and other preservation methods on the overall juice quality were discussed. During juice processing,

  16. Participative Facility Planning for Obstetrical and Neonatal Care Processes: Beginning of Life Process

    Directory of Open Access Journals (Sweden)

    Jori Reijula

    2016-01-01

    Full Text Available Introduction. Old hospitals may promote inefficient patient care processes and safety. A new, functionally planned hospital presents a chance to create an environment that supports streamlined, patient-centered healthcare processes and adapts to users’ needs. This study depicts the phases of a facility planning project for pregnant women and newborn care processes (beginning of life process at Turku University Hospital. Materials and Methods. Project design reports and meeting documents were utilized to assess the beginning of life process as well as the work processes of the Women’s and Children’s Hospital. Results. The main elements of the facility design (FD project included rigorous preparation for the FD phase, functional planning throughout the FD process, and setting key values: (1 family-centered care, (2 Lean thinking and Lean tools as the framework for the FD process, (3 safety, and (4 cooperation. Conclusions. A well-prepared FD project with sufficient insight into functional planning, Lean thinking, and user-centricity seemed to facilitate the actual FD process. Although challenges occurred, the key values were not forgone and were successfully incorporated into the new hospital building.

  17. Analysis quality of content digital plan of cadastre lines (underground installation

    Directory of Open Access Journals (Sweden)

    Marinković Goran

    2016-01-01

    Full Text Available This work presents the results of research quality digital geodetic plans lines and underground installations. The study included the creation of a digital geodetic plan sewerage network vectorization of analogue geodetic plans and creation of digital geodetic plan of the same details from the original data survey and maintenance survey. Based on research results the analysis of the accuracy and reliability digital geodetic plan created vectoring analogue plan or 'digitizing from the screen'. The results obtained in this work, the can be use not only in the Republic of Serbia, but also in other countries where digitalization of geodetic plans are increasingly gaining in importance.

  18. Connected vehicle impacts on transportation planning technical memorandum #2 : connected vehicle planning processes and products and stakeholder roles and responsibilities.

    Science.gov (United States)

    2015-01-01

    The objective of this project, Connected Vehicle Impacts on Transportation Planning, is to comprehensively assess how connected vehicles should : be considered across the range of transportation planning processes and products developed by Stat...

  19. Process to Continuously Melt, Refine and Cast High Quality Steel

    Energy Technology Data Exchange (ETDEWEB)

    None

    2005-09-01

    The purpose of this project is to conduct research and development targeted at designing a revolutionary steelmaking process. This process will deliver high quality steel from scrap to the casting mold in one continuous process and will be safer, more productive, and less capital intensive to build and operate than conventional steelmaking. The new process will produce higher quality steel faster than traditional batch processes while consuming less energy and other resources.

  20. Plan-provider integration, premiums, and quality in the Medicare Advantage market.

    Science.gov (United States)

    Frakt, Austin B; Pizer, Steven D; Feldman, Roger

    2013-12-01

    To investigate how integration between Medicare Advantage plans and health care providers is related to plan premiums and quality ratings. We used public data from the Centers for Medicare and Medicaid Services (CMS) and the Area Resource File and private data from one large insurer. Premiums and quality ratings are from 2009 CMS administrative files and some control variables are historical. We estimated ordinary least-squares models for premiums and plan quality ratings, with state fixed effects and firm random effects. The key independent variable was an indicator of plan-provider integration. With the exception of Medigap premium data, all data were publicly available. We ascertained plan-provider integration through examination of plans' websites and governance documents. We found that integrated plan-providers charge higher premiums, controlling for quality. Such plans also have higher quality ratings. We found no evidence that integration is associated with more generous benefits. Current policy encourages plan-provider integration, although potential effects on health insurance products and markets are uncertain. Policy makers and regulators may want to closely monitor changes in premiums and quality after integration and consider whether quality improvement (if any) justifies premium increases (if they occur). © Health Research and Educational Trust.