  1. Use of statistic control of the process as part of a quality assurance plan

    International Nuclear Information System (INIS)

    Acosta, S.; Lewis, C.

    2013-01-01

    One of the technical requirements of the standard IRAM ISO 17025 for the accreditation of testing laboratories, is the assurance of the quality of the results through the control and monitoring of the factors influencing the reliability of them. The grade the factors contribute to the total measurement uncertainty, determines which of them should be considered when developing a quality assurance plan. The laboratory of environmental measurements of strontium-90 in the accreditation process, performs most of its determinations in samples with values close to the detection limit. For this reason the correct characterization of the white, is a critical parameter and is verified through a letter for statistical process control. The scope of the present work is concerned the control of whites and so it was collected a statistically significant amount of data, for a period of time that is covered of different conditions. This allowed consider significant variables in the process, such as temperature and humidity, and build a graph of white control, which forms the basis of a statistical process control. The data obtained were lower and upper limits for the preparation of the charter white control. In this way the process of characterization of white was considered to operate under statistical control and concludes that it can be used as part of a plan of insurance of the quality

  2. Planning for design quality

    International Nuclear Information System (INIS)

    Marguglio, B.W.

    1977-01-01

    In the nuclear industry and in other high technology industries in which the Government serves as either a customer or a regulator, it is almost always required that the contractor prepare a Quality Program Plan sometimes also referred to as a Quality Program Index. Often, the Quality Program Plan is included as part of the contractor's proposal in response to the Government's or a prime contractor's Request for Proposal. At this stage, the Quality Program Plan serves to demonstrate to the prospective customer the availability of the various quality systems. It provides the customer with a commitment as to the use of these quality systems, thus giving greater assurance that the customer's overall quality and design requirements can be met. The Quality Program Plan is contributing to the salability of the proposal. 1 ref

  3. Sandia National Laboratories Advanced Simulation and Computing (ASC) software quality plan. Part 1: ASC software quality engineering practices, Version 2.0.

    Energy Technology Data Exchange (ETDEWEB)

    Sturtevant, Judith E.; Heaphy, Robert; Hodges, Ann Louise; Boucheron, Edward A.; Drake, Richard Roy; Minana, Molly A.; Hackney, Patricia; Forsythe, Christi A.; Schofield, Joseph Richard, Jr. (,; .); Pavlakos, Constantine James; Williamson, Charles Michael; Edwards, Harold Carter

    2006-09-01

    The purpose of the Sandia National Laboratories Advanced Simulation and Computing (ASC) Software Quality Plan is to clearly identify the practices that are the basis for continually improving the quality of ASC software products. The plan defines the ASC program software quality practices and provides mappings of these practices to Sandia Corporate Requirements CPR 1.3.2 and 1.3.6 and to a Department of Energy document, ASCI Software Quality Engineering: Goals, Principles, and Guidelines. This document also identifies ASC management and software project teams responsibilities in implementing the software quality practices and in assessing progress towards achieving their software quality goals.

  4. Quality Assurance Project Plan for Facility Effluent Monitoring Plan activities

    International Nuclear Information System (INIS)

    Frazier, T.P.

    1994-01-01

    This Quality Assurance Project Plan addresses the quality assurance requirements for the activities associated with the Facility Effluent Monitoring Plans, which are part of the overall Hanford Site Environmental Protection Plan. This plan specifically applies to the sampling and analysis activities and continuous monitoring performed for all Facility Effluent Monitoring Plan activities conducted by Westinghouse Hanford Company. It is generic in approach and will be implemented in conjunction with the specific requirements of the individual Facility Effluent Monitoring Plans

  5. Sandia National Laboratories Advanced Simulation and Computing (ASC) software quality plan. Part 1 : ASC software quality engineering practices version 1.0.

    Energy Technology Data Exchange (ETDEWEB)

    Minana, Molly A.; Sturtevant, Judith E.; Heaphy, Robert; Hodges, Ann Louise; Boucheron, Edward A.; Drake, Richard Roy; Forsythe, Christi A.; Schofield, Joseph Richard, Jr.; Pavlakos, Constantine James; Williamson, Charles Michael; Edwards, Harold Carter

    2005-01-01

    The purpose of the Sandia National Laboratories (SNL) Advanced Simulation and Computing (ASC) Software Quality Plan is to clearly identify the practices that are the basis for continually improving the quality of ASC software products. Quality is defined in DOE/AL Quality Criteria (QC-1) as conformance to customer requirements and expectations. This quality plan defines the ASC program software quality practices and provides mappings of these practices to the SNL Corporate Process Requirements (CPR 1.3.2 and CPR 1.3.6) and the Department of Energy (DOE) document, ASCI Software Quality Engineering: Goals, Principles, and Guidelines (GP&G). This quality plan identifies ASC management and software project teams' responsibilities for cost-effective software engineering quality practices. The SNL ASC Software Quality Plan establishes the signatories commitment to improving software products by applying cost-effective software engineering quality practices. This document explains the project teams opportunities for tailoring and implementing the practices; enumerates the practices that compose the development of SNL ASC's software products; and includes a sample assessment checklist that was developed based upon the practices in this document.

  6. Use of statistic control of the process as part of a quality assurance plan; Empleo del control estadistico de proceso como parte de un plan de aseguramiento de la calidad

    Energy Technology Data Exchange (ETDEWEB)

    Acosta, S.; Lewis, C., E-mail: sacosta@am.gob.ar [Autoridad Regulatoria Nuclear (ARN), Buenos Aires (Argentina)

    2013-07-01

    One of the technical requirements of the standard IRAM ISO 17025 for the accreditation of testing laboratories, is the assurance of the quality of the results through the control and monitoring of the factors influencing the reliability of them. The grade the factors contribute to the total measurement uncertainty, determines which of them should be considered when developing a quality assurance plan. The laboratory of environmental measurements of strontium-90 in the accreditation process, performs most of its determinations in samples with values close to the detection limit. For this reason the correct characterization of the white, is a critical parameter and is verified through a letter for statistical process control. The scope of the present work is concerned the control of whites and so it was collected a statistically significant amount of data, for a period of time that is covered of different conditions. This allowed consider significant variables in the process, such as temperature and humidity, and build a graph of white control, which forms the basis of a statistical process control. The data obtained were lower and upper limits for the preparation of the charter white control. In this way the process of characterization of white was considered to operate under statistical control and concludes that it can be used as part of a plan of insurance of the quality.

  7. Sandia National Laboratories Advanced Simulation and Computing (ASC) software quality plan part 2 mappings for the ASC software quality engineering practices, version 2.0.

    Energy Technology Data Exchange (ETDEWEB)

    Heaphy, Robert; Sturtevant, Judith E.; Hodges, Ann Louise; Boucheron, Edward A.; Drake, Richard Roy; Minana, Molly A.; Hackney, Patricia; Forsythe, Christi A.; Schofield, Joseph Richard, Jr. (,; .); Pavlakos, Constantine James; Williamson, Charles Michael; Edwards, Harold Carter

    2006-09-01

    The purpose of the Sandia National Laboratories Advanced Simulation and Computing (ASC) Software Quality Plan is to clearly identify the practices that are the basis for continually improving the quality of ASC software products. The plan defines the ASC program software quality practices and provides mappings of these practices to Sandia Corporate Requirements CPR001.3.2 and CPR001.3.6 and to a Department of Energy document, ''ASCI Software Quality Engineering: Goals, Principles, and Guidelines''. This document also identifies ASC management and software project teams' responsibilities in implementing the software quality practices and in assessing progress towards achieving their software quality goals.

  8. Waste Management Quality Assurance Plan

    International Nuclear Information System (INIS)

    1993-01-01

    Lawrence Berkeley Laboratory's Environment Department addresses its responsibilities through activities in a variety of areas. The need for a comprehensive management control system for these activities has been identified by the Department of Energy (DOE). The WM QA (Waste Management Quality Assurance) Plan is an integral part of a management system that provides controls necessary to ensure that the department's activities are planned, performed, documented, and verified. This WM QA Plan defines the requirements of the WM QA program. These requirements are derived from DOE Order 5700.6C, Quality Assurance, the LBL Operating and Assurance Program Plan (OAP, LBL PUB-3111), and other environmental compliance documents applicable to WM activities. The requirements presented herein, as well as the procedures and methodologies that direct the implementation of these requirements, will undergo review and revisions as necessary. The provisions of this QA Plan and its implementing documents apply to quality-affecting activities performed by and for WM. It is also applicable to WM contractors, vendors, and other LBL organizations associated with WM activities, except where such contractors, vendors, or organizations are governed by their own WM-approved QA programs. References used in the preparation of this document are (1) ASME NQA-1-1989, (2) ANSI/ASQC E4 (Draft), (3) Waste Management Quality Assurance Implementing Management Plan (LBL PUB-5352, Rev. 1), (4) LBL Operating and Assurance Program Plan (OAP), LBL PUB-3111, 2/3/93. A list of terms and definitions used throughout this document is included as Appendix A

  9. Design of Cycle 3 of the National Water-Quality Assessment Program, 2013-23: Part 2: Science plan for improved water-quality information and management

    Science.gov (United States)

    Rowe, Gary L.; Belitz, Kenneth; Demas, Charlie R.; Essaid, Hedeff I.; Gilliom, Robert J.; Hamilton, Pixie A.; Hoos, Anne B.; Lee, Casey J.; Munn, Mark D.; Wolock, David W.

    2013-01-01

    This report presents a science strategy for the third decade of the National Water-Quality Assessment (NAWQA) Program, which since 1991, has been responsible for providing nationally consistent information on the quality of the Nation's streams and groundwater; how water quality is changing over time; and the major natural and human factors that affect current water quality conditions and trends. The strategy is based on an extensive evaluation of the accomplishments of NAWQA over its first two decades, the current status of water-quality monitoring activities by USGS and its partners, and an updated analysis of stakeholder priorities. The plan is designed to address priority issues and national needs identified by NAWQA stakeholders and the National Research Council (2012) irrespective of budget constraints. This plan describes four major goals for the third decade (Cycle 3), the approaches for monitoring, modeling, and scientific studies, key partnerships required to achieve these goals, and products and outcomes that will result from planned assessment activities. The science plan for 2013–2023 is a comprehensive approach to meet stakeholder priorities for: (1) rebuilding NAWQA monitoring networks for streams, rivers, and groundwater, and (2) upgrading models used to extrapolate and forecast changes in water-quality and stream ecosystem condition in response to changing climate and land use. The Cycle 3 plan continues approaches that have been central to the Program’s long-term success, but adjusts monitoring intensities and study designs to address critical information needs and identified data gaps. Restoration of diminished monitoring networks and new directions in modeling and interpretative studies address growing and evolving public and stakeholder needs for water-quality information and improved management, particularly in the face of increasing challenges related to population growth, increasing demands for water, and changing land use and climate

  10. Air quality management planning (AQMP

    Directory of Open Access Journals (Sweden)

    Sivertsen Bjarne

    2012-01-01

    Full Text Available In most urban areas of the world, particulate matter (PM levels pose severe problems, addressed in several policy areas (air quality, climate change, and human health. PM presents multiple challenges due to the multitude of its sources, spanning many sectors of economic activity as well as nature, and due to the complexity of atmospheric processes involved in its transport and secondary formation. For the authorities, the goal is to assure minimal impacts of atmospheric PM levels, in practice represented by compliance with existing regulations and standards. This may be achieved through an air quality management plan (AQMP. In Northern America and in parts of Europe, comprehensive research programs have guided development of AQMP over the last forty years. This cumulated experience can be utilized by others who face the same problems, but have yet to develop their own substantial research base. The main purpose of the AQMP development process is to establish an effective and sound basis for planning and management of air quality in a selected area. This type of planning will ensure that significant sources of impacts are identified and controlled in a most cost-effective manner. The choice of tools, methods and input information is often dictated by their availability, and should be evaluated against current best practices. Important elements of the AQMP are the identification of sources and development of a complete emission inventory, the development and operation of an air quality monitoring programme, and the development and application of atmospheric dispersion models. Major task is to collect the necessary input data. The development of the AQMP will take into account: - Air Quality Management System (AQMS requirements; - Operational and functional structure requirements; - Source identification through emission inventories; - Source reduction alternatives, which may be implemented; - Mechanisms for facilitating interdepartmental

  11. Region 7 Quality Management Plan

    Science.gov (United States)

    To document adherence to EPA Order 5360.1 A2, EPA requires each organizational unitto develop a quality management plan per the specifications in EPA Requirements for QualityManagement Plans, EPA QA R-2.

  12. Waste Management Quality Assurance Plan

    International Nuclear Information System (INIS)

    2006-01-01

    The WMG QAP is an integral part of a management system designed to ensure that WMG activities are planned, performed, documented, and verified in a manner that assures a quality product. A quality product is one that meets all waste acceptance criteria, conforms to all permit and regulatory requirements, and is accepted at the offsite treatment, storage, and disposal facility. In addition to internal processes, this QA Plan identifies WMG processes providing oversight and assurance to line management that waste is managed according to all federal, state, and local requirements for waste generator areas. A variety of quality assurance activities are integral to managing waste. These QA functions have been identified in the relevant procedures and in subsequent sections of this plan. The WMG QAP defines the requirements of the WMG quality assurance program. These requirements are derived from Department of Energy (DOE) Order 414.1C, Quality Assurance, Contractor Requirements Document, the LBNL Operating and Assurance Program Plan (OAP), and other applicable environmental compliance documents. The QAP and all associated WMG policies and procedures are periodically reviewed and revised, as necessary, to implement corrective actions, and to reflect changes that have occurred in regulations, requirements, or practices as a result of feedback on work performed or lessons learned from other organizations. The provisions of this QAP and its implementing documents apply to quality-affecting activities performed by the WMG; WMG personnel, contractors, and vendors; and personnel from other associated LBNL organizations, except where such contractors, vendors, or organizations are governed by their own WMG-approved QA programs

  13. An independent monitor unit calculation by commercial software as a part of a radiotherapy treatment planning system quality control

    International Nuclear Information System (INIS)

    Nechvil, K.; Mynarik, J.

    2014-01-01

    For the independent calculation of the monitored unit (MU) the commercial software RadCalc (Lifeline Software Inc., Tyler TX) was used as the choice of some available similar programs. The program was configured and used to verify the doses calculated by commercially accessible planning system Eclipse version 8.6.17 (Varian Medical System Inc., Palo Alto). This system is being used during the clinical running for the creation of the treatment plans. The results of each plan were compared to the dose phantom measurements by the ionization chamber at the same point in which the calculation were done (Eclipse, RadCalc) - in the izocentre. TPS is configured by the beam data (PDD and OAR). Those beam data were exported and afterwards the same data were imported to the program RadCalc. The consistent and independent data between TPS and RadCalc were gained by this process. The reference conditions were set the identical in RadCalc as in TPS, so the consistency between TPS and RadCalc output factors has been achieved (Collimator Scatter Factor: Sc, Phantom Scatter Factor: Sp). Those output factors were also measured by the ionizing chamber in the water phantom and compared with the TPS. Based on the clinical data of the response to the doses, ICRU recommends ensuring the ability of dosimetric systems to deliver the doses with accuracy of at least 5%. Many factors, such as layout of anatomic structures, positioning of a patient, factors related to an accelerator (a dose calibration and mechanic parameters) cause random and systematic failures in a dose delivery. The source of some problems can be also caused by the system databases and relating information transfer; and the TPS containing besides other things other dose calculation algorithms. (authors)

  14. 42 CFR 84.40 - Quality control plans; filing requirements.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false Quality control plans; filing requirements. 84.40... Control § 84.40 Quality control plans; filing requirements. As a part of each application for approval or... proposed quality control plan which shall be designed to assure the quality of respiratory protection...

  15. 30 CFR 28.30 - Quality control plans; filing requirements.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Quality control plans; filing requirements. 28... PROTECTION FOR TRAILING CABLES IN COAL MINES Quality Control § 28.30 Quality control plans; filing... part, each applicant shall file with MSHA a proposed quality control plan which shall be designed to...

  16. Project Specific Quality Assurance Plan

    International Nuclear Information System (INIS)

    Pedersen, K.S.

    1995-01-01

    This Quality Assurance Project Plan (QAPP) identifies the Westinghouse Hanford Co. (WHC) Quality Assurance (QA) program requirements for all contractors involved in the planning and execution of the design, construction, testing and inspection of the 200 Area Effluent BAT/AKART Implementation, Project W-291

  17. Quality planning in Construction Project

    Science.gov (United States)

    Othman, I.; Shafiq, Nasir; Nuruddin, M. F.

    2017-12-01

    The purpose of this paper is to investigate deeper on the factors that contribute to the effectiveness of quality planning, identifying the common problems encountered in quality planning, practices and ways for improvements in quality planning for construction projects. This paper involves data collected from construction company representatives across Malaysia that are obtained through semi-structured interviews as well as questionnaire distributions. Results shows that design of experiments (average index: 4.61), inspection (average index: 4.45) and quality audit as well as other methods (average index: 4.26) rank first, second and third most important factors respectively.

  18. Project Quality Plan

    DEFF Research Database (Denmark)

    Sandborg-Petersen, Ulrik; Øhrstrøm, Peter

    This document defines the procedures, standards, and strategies which will be used to ensure high standards of quality of the work produced within the HANDS project. It contains the following sections...

  19. Quality-Assurance Program Plan

    International Nuclear Information System (INIS)

    Kettell, R.A.

    1981-05-01

    This Quality Assurance Program Plan (QAPP) is provided to describe the Quality Assurance Program which is applied to the waste management activities conducted by AESD-Nevada Operations at the E-MAD Facility located in Area 25 of the Nevada Test Site. The AESD-Nevada Operations QAPP provides the necessary systematic and administrative controls to assure activities that affect quality, safety, reliability, and maintainability during design, procurement, fabrication, inspection, shipments, tests, and storage are conducted in accordance with established requirements

  20. Software quality assurance plan for GCS

    Science.gov (United States)

    Duncan, Stephen E.; Bailey, Elizabeth K.

    1990-01-01

    The software quality assurance (SQA) function for the Guidance and Control Software (GCS) project which is part of a software error studies research program is described. The SQA plan outlines all of the procedures, controls, and audits to be carried out by the SQA organization to ensure adherence to the policies, procedures, and standards for the GCS project.

  1. Planning product quality: An example - ornamental plants

    Directory of Open Access Journals (Sweden)

    Kovačević Miodrag

    2003-01-01

    Full Text Available The industry of ornamental plants is a subject of quality planning. The quality plan is a document setting out the specific quality practices in ornamental plants production. That plan introduce organizational structure procedures, processes and resources needed to implement quality in life cycle of product chain. For engineers it represents a new tool.

  2. Application of a short term air quality action plan in Madrid (Spain) under a high-pollution episode - Part I: Diagnostic and analysis from observations.

    Science.gov (United States)

    Borge, Rafael; Artíñano, Begoña; Yagüe, Carlos; Gomez-Moreno, Francisco Javier; Saiz-Lopez, Alfonso; Sastre, Mariano; Narros, Adolfo; García-Nieto, David; Benavent, Nuria; Maqueda, Gregorio; Barreiro, Marcos; de Andrés, Juan Manuel; Cristóbal, Ángeles

    2018-03-28

    Exceedances of NO 2 hourly limit value (200 μg·m -3 ) imply the need to implement short term action plans to avoid adverse effects on human health in urban areas. The Madrid City Council applied the stage 3 of the NO 2 protocol during a high-pollution episode under stable meteorological conditions on December 2016 for the first time. This included road traffic access restrictions to the city centre (50% of conventional private vehicles based on plate numbers). In this contribution we analyse different meteorological and air quality observations, including non-standard parameters (such as number of ultrafine particles and remote sensing techniques MAXDOAS) for a better understanding of the effectivity of short-term emission abatement measures under real conditions and to identify options to improve the NO 2 protocol in the future. According to our results, the inversion base height computed from vertical temperature soundings is a meaningful index to anticipate very unfavourable conditions and trigger the actions included in the protocol. The analysis of the concentration levels of the main pollutants from the Madrid air quality monitoring network indicate that only stage 3 of the protocol had a significant effect on NO 2 maximum concentrations. The restrictions applied may have prevented NO 2 concentrations to further increase in the city centre (up to 15%) although pollution levels in the city outskirts, outside the area directly affected by the traffic restrictions, remained unchanged or may have been slightly increased. Nonetheless, further studies are needed to estimate more precisely the effect of the measures taken and to assess potential trade-offs. Our results suggest that emissions play an important role also under very strong stability conditions although drastic measures are needed to achieve a significant impact. This highlights the importance of an appropriate timing for short-term actions and the need of permanent abatement measures related to air

  3. Planning and conducting meetings effectively, part I: planning a meeting.

    Science.gov (United States)

    Harolds, Jay

    2011-12-01

    Meetings are held by leaders for many purposes, including conveying information, raising morale, asking for opinions, brain storming, making people part of the problem-solving process, building trust, getting to a consensus, and making decisions. However, many meetings waste time, some undermine the leader's power, and some decrease morale. Part I of this series of articles gives some tips on basic planning for decision-making meetings. Part II of this series of articles analyzes selected components of decision-making meetings. Part III of this series will be on how the chairperson keeps decision-making meetings on track to make them efficient and productive.

  4. Sandia software guidelines: Software quality planning

    Energy Technology Data Exchange (ETDEWEB)

    1987-08-01

    This volume is one in a series of Sandia Software Guidelines intended for use in producing quality software within Sandia National Laboratories. In consonance with the IEEE Standard for Software Quality Assurance Plans, this volume identifies procedures to follow in producing a Software Quality Assurance Plan for an organization or a project, and provides an example project SQA plan. 2 figs., 4 tabs.

  5. Integrated concurrent utilization quality review, Part one.

    Science.gov (United States)

    Caterinicchio, R P

    1987-01-01

    This article is the first of a two-part series which argues for the concurrent management of the appropriateness, necessity, and quality of patient care. Intensifying scrutiny by the credentialing groups, the PROs and all third-party payors underscores the vital need to implement cost-effective information systems which integrate the departmentalized functions of patient-physician profiling, DRG case-mix analyses, length of stay monitoring, pre-admission/admission and continued stay review, discharge planning, risk management, incident reporting and quality review. In the domain of physician performance regarding admitting and practice patterns, the ability to exercise concurrent utilization-quality review means early detection and prevention of events which would otherwise result in denials of payment and/or compromised patient care. Concurrent utilization-quality review must, by definition, be managerially invasive and focused; hence, it is integral to maintaining the integrity of the services and product lines offered by the provider. In fact, if PPO status is a marketing agenda, then the institutional objectives of cost-effectiveness, productivity, value, and competitiveness can only be achieved through concurrent utilization-quality review.

  6. Quality Assurance Project Plan for Facility Effluent Monitoring Plan activities

    International Nuclear Information System (INIS)

    Nickels, J.M.

    1991-06-01

    This Quality Assurance Project Plan addresses the quality assurance requirements for the Facility Monitoring Plans of the overall site-wide environmental monitoring plan. This plan specifically applies to the sampling and analysis activities and continuous monitoring performed for all Facility Effluent Monitoring Plan activities conducted by Westinghouse Hanford Company. It is generic in approach and will be implemented in conjunction with the specific requirements of individual Facility Effluent Monitoring Plans. This document is intended to be a basic road map to the Facility Effluent Monitoring Plan documents (i.e., the guidance document for preparing Facility Effluent Monitoring Plans, Facility Effluent Monitoring Plan determinations, management plan, and Facility Effluent Monitoring Plans). The implementing procedures, plans, and instructions are appropriate for the control of effluent monitoring plans requiring compliance with US Department of Energy, US Environmental Protection Agency, state, and local requirements. This Quality Assurance Project Plan contains a matrix of organizational responsibilities, procedural resources from facility or site manuals used in the Facility Effluent Monitoring Plans, and a list of the analytes of interest and analytical methods for each facility preparing a Facility Effluent Monitoring Plan. 44 refs., 1 figs., 2 tabs

  7. Quality planning for major plant design modifications

    International Nuclear Information System (INIS)

    Dulee, R.J.

    1988-01-01

    This paper reviews the approach and activities undertaken by Public Service Electric and Gas Company's (PSE and G's) nuclear quality assurance (QA) department to support major plant design modifications conducted during refueling outages at Salem Generating Station. It includes the planning and implementation of quality plans developed to provide both QA and quality control (QC) coverage of modification performed by contracted service organizations

  8. Total quality management program planning

    Energy Technology Data Exchange (ETDEWEB)

    Thornton, P.T.; Spence, K.

    1994-05-01

    As government funding grows scarce, competition between the national laboratories is increasing dramatically. In this era of tougher competition, there is no for resistance to change. There must instead be a uniform commitment to improving the overall quality of our products (research and technology) and an increased focus on our customers` needs. There has been an ongoing effort to bring the principles of total quality management (TQM) to all Energy Systems employees to help them better prepare for future changes while responding to the pressures on federal budgets. The need exists for instituting a vigorous program of education and training to an understanding of the techniques needed to improve and initiate a change in organizational culture. The TQM facilitator is responsible for educating the work force on the benefits of self-managed work teams, designing a program of instruction for implementation, and thus getting TQM off the ground at the worker and first-line supervisory levels so that the benefits can flow back up. This program plan presents a conceptual model for TQM in the form of a hot air balloon. In this model, there are numerous factors which can individually and collectively impede the progress of TQM within the division and the Laboratory. When these factors are addressed and corrected, the benefits of TQM become more visible. As this occurs, it is hoped that workers and management alike will grasp the ``total quality`` concept as an acceptable agent for change and continual improvement. TQM can then rise to the occasion and take its rightful place as an integral and valid step in the Laboratory`s formula for survival.

  9. Part 2: Surface water quality

    International Nuclear Information System (INIS)

    1997-01-01

    In 1996 the surface water quality measurements were performed, according to the Agreement, at 8 profiles on the Hungarian territory and at 15 profiles on the Slovak territory. Basic physical and chemical parameters (as water temperature, pH values, conductivity, suspended solids, cations and anions (nitrates, ammonium ion, nitrites, total nitrogen, phosphates, total phosphorus, oxygen and organic carbon regime parameters), metals (iron, manganese and heavy metals), biological and microbiological parameters (coliform bacteria, chlorophyll-a, saprobity index and other biological parameters) and quality of sediment were measured

  10. Checklist for Reviewing EPA Quality Management Plans

    Science.gov (United States)

    This checklist will be used to review the Quality Management Plans (QMPs) that are submitted to the Quality Staff of the Office of Environmental Information (OEI) for Agency review under EPA Order 5360.1 A2.

  11. Quality Assurance Planning for Region 9

    Science.gov (United States)

    The ultimate success of an environmental program or project depends on the quality of the environmental data collected and used in decision-making. EPA has developed guidances to help state and tribal governments develop Quality Assurance Program Plans.

  12. [Quality planning of Family Health Units using Quality Function Deployment (QFD)].

    Science.gov (United States)

    Volpato, Luciana Fernandes; Meneghim, Marcelo de Castro; Pereira, Antonio Carlos; Ambrosano, Gláucia Maria Bovi

    2010-08-01

    Quality is an indispensible requirement in the health field, and its pursuit is necessary in order to meet demands by a population that is aware of its rights, as part of the essence of good work relations, and to decrease technological costs. Quality thus involves all parties to the process (users and professionals), and is no longer merely an attribute of the health service. This study aimed to verify the possibility of quality planning in the Family Health Units, using Quality Function Deployment (QFD). QFD plans quality according to user satisfaction, involving staff professionals and identifying new approaches to improve work processes. Development of the array, called the House of Quality, is this method's most important characteristics. The results show a similarity between the quality demanded by users and the quality planned by professionals. The current study showed that QFD is an efficient tool for quality planning in public health services.

  13. 78 FR 18936 - Revision to the California State Implementation Plan, South Coast Air Quality Management Plan

    Science.gov (United States)

    2013-03-28

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2012-0920; FRL-9779-1] Revision to the California State Implementation Plan, South Coast Air Quality Management Plan AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve a revision to the South...

  14. Strategic planning for hotel operations: The Ritz-Carlton Hotel Company (Part II).

    Science.gov (United States)

    Shriver, S J

    1993-01-01

    The Ritz-Carlton Hotel Company won the Malcolm Baldrige National Quality Award in 1992. One key to its success is its strategic planning process. In this second part of a two-part article, Stephen Shriver concludes his review of the Ritz-Carlton's approach to strategic planning. Shriver begins by outlining some key steps in plan development and goes on to describe how the Ritz-Carlton disseminates, implements, and evaluates the plan.

  15. Coastal pollution emergency plan. Part I

    Energy Technology Data Exchange (ETDEWEB)

    Semanov, G.; Volkov, V.; Somkin, V.; Iljushenko-Krylov, D.

    1997-12-31

    A higher degree of ecological safety in ship traffic depends on onboard measures as well as reception facilities on shore, treatment of ship generated wastes and preparedness for combating emergency oil spills. The problem is particularly acute in the North Sea Route (NSR) due to high vulnerability of the Arctic ecosystems, low rates of natural degradation of oil, absence of forward coastal infrastructure, low efficiency of oil combating means in ice conditions and severe climatic conditions. Oil spills in the NSR are likely to occur as the offshore production and transportation of oil increase. Therefore a regional Oil Spill Contingency Plan (OSCP) is being constructed and developed on 3 levels: 1) Development of concept, definition of response organisations and their technical ability (Part I). 2) Collection and analysis of information, development of scenarios of probable oil spills, clearing of the funding mechanism and basis for additional outside co-operation from other Russian regions and circumpolar countries (part II). 3) Development of NSR OSCP (part III). The present report (part I) provides the plan concept, rescue organisations and data on types and amounts of the oil spill combating technical means and of the floating facilities available in the NSR or it`s vicinity. The concept takes into account subdivision of the Route, interaction and links between responsible organisations, realities of the Russian Arctic such as transport, communications, energy, labour resources etc. and requirements of the IMO and of the International Convention OPRC 90. According to Russian legislation implementation of combating operations at sea is the responsibility of the Maritime Pollution Control and Salvage Administration that consists of a Central Administration and basin emergency divisions situated in Murmansk and Nahodka. The body is responsible for carrying out cleaning operations at sea from installations and may be assisted by resources and means of the co

  16. Quality assurance program plan for radionuclide airborne emissions monitoring

    International Nuclear Information System (INIS)

    Boom, R.J.

    1995-03-01

    This Quality Assurance Program Plan identifies quality assurance program requirements and addresses the various Westinghouse Hanford Company organizations and their particular responsibilities in regards to sample and data handling of airborne emissions. The Hanford Site radioactive airborne emissions requirements are defined in National Emissions Standards for Hazardous Air Pollutants (NESHAP), Code of Federal Regulations, Title 40, Part 61, Subpart H (EPA 1991a). Reporting of the emissions to the US Department of Energy is performed in compliance with requirements of US Department of Energy, Richland Operations Office Order 5400.1, General Environmental Protection Program (DOE-RL 1988). This Quality Assurance Program Plan is prepared in accordance with and to the requirements of QAMS-004/80, Guidelines and Specifications for Preparing Quality Assurance Program Plans (EPA 1983). Title 40 CFR Part 61, Appendix B, Method 114, Quality Assurance Methods (EPA 1991b) specifies the quality assurance requirements and that a program plan should be prepared to meet the requirements of this regulation. This Quality Assurance Program Plan identifies NESHAP responsibilities and how the Westinghouse Hanford Company Environmental, Safety, Health, and Quality Assurance Division will verify that the methods are properly implemented

  17. Transuranic Waste Characterization Quality Assurance Program Plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-04-30

    This quality assurance plan identifies the data necessary, and techniques designed to attain the required quality, to meet the specific data quality objectives associated with the DOE Waste Isolation Pilot Plant (WIPP). This report specifies sampling, waste testing, and analytical methods for transuranic wastes.

  18. Transuranic Waste Characterization Quality Assurance Program Plan

    International Nuclear Information System (INIS)

    1995-01-01

    This quality assurance plan identifies the data necessary, and techniques designed to attain the required quality, to meet the specific data quality objectives associated with the DOE Waste Isolation Pilot Plant (WIPP). This report specifies sampling, waste testing, and analytical methods for transuranic wastes

  19. Air quality and future energy system planning

    Science.gov (United States)

    Sobral Mourao, Zenaida; Konadu, Dennis; Lupton, Rick

    2016-04-01

    Ambient air pollution has been linked to an increasing number of premature deaths throughout the world. Projected increases in demand for food, energy resources and manufactured products will likely contribute to exacerbate air pollution with an increasing impact on human health, agricultural productivity and climate change. Current events such as tampering emissions tests by VW car manufacturers, failure to comply with EU Air Quality directives and WHO guidelines by many EU countries, the problem of smog in Chinese cities and new industrial emissions regulations represent unique challenges but also opportunities for regulators, local authorities and industry. However current models and practices of energy and resource use do not consider ambient air impacts as an integral part of the planing process. Furthermore the analysis of drivers, sources and impacts of air pollution is often fragmented, difficult to understand and lacks effective visualization tools that bring all of these components together. This work aims to develop a model that links impacts of air quality on human health and ecosystems to current and future developments in the energy system, industrial and agricultural activity and patterns of land use. The model will be added to the ForeseerTM tool, which is an integrated resource analysis platform that has been developed at the University of Cambridge initially with funding from BP and more recently through the EPSRC funded Whole Systems Energy Modeling (WholeSEM) project. The basis of the tool is a set of linked physical models for energy, water and land, including the technologies that are used to transform these resources into final services such as housing, food, transport and household goods. The new air quality model will explore different feedback effects between energy, land and atmospheric systems with the overarching goal of supporting better communication about the drivers of air quality and to incorporate concerns about air quality into

  20. Quality Customer Service Action Plan

    International Nuclear Information System (INIS)

    2008-12-01

    Since its establishment in 1992 the RPII has been committed to the provision of high quality services to its customers. This report outlines how the RPII will work towards providing a high quality service to our customers and the standards we aim for in the provision of our services

  1. Total Quality Management Master Plan

    Science.gov (United States)

    1989-01-01

    Enhanced competitiveness in the private . public and international sectors - Increased cash flow, influenced by contractor’s contributions to quality I...the project applies novel public- sector compensation concepts gleaned from the best in the private sector . Major employee development opportunities...management must strive to upgrade the quality of worklife which will also contribute to an environment which fosters continuous improvement. Individuals

  2. Quality assurance program plan for Building 324

    International Nuclear Information System (INIS)

    Tanke, J.M.

    1997-01-01

    This Quality Assurance Program Plan (QAPP) provides an overview of the quality assurance program for Building 324. This plan supersedes the PNNL Nuclear Facilities Quality Management System Description, PNL-NF-QMSD, Revision 2, dated March 1996. The program applies to the facility safety structures, systems, and components and to activities that could affect safety structures, systems, and components. Adherence to the quality assurance program ensures the following: US Department of Energy missions and objectives are effectively accomplished; Products and services are safe, reliable, and meet or exceed the requirements and expectations of the user; Hazards to the public, to Hanford Site and facility workers, and to the environment are minimized. The format of this Quality Assurance Program Plan is structured to parallel that of 10 CFR 83 0.120, Quality Assurance Requirements

  3. 40 CFR 130.6 - Water quality management plans.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 21 2010-07-01 2010-07-01 false Water quality management plans. 130.6... QUALITY PLANNING AND MANAGEMENT § 130.6 Water quality management plans. (a) Water quality management (WQM... and certified and approved updates to those plans. Continuing water quality planning shall be based...

  4. SWiFT Software Quality Assurance Plan.

    Energy Technology Data Exchange (ETDEWEB)

    Berg, Jonathan Charles [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2016-01-01

    This document describes the software development practice areas and processes which contribute to the ability of SWiFT software developers to provide quality software. These processes are designed to satisfy the requirements set forth by the Sandia Software Quality Assurance Program (SSQAP). APPROVALS SWiFT Software Quality Assurance Plan (SAND2016-0765) approved by: Department Manager SWiFT Site Lead Dave Minster (6121) Date Jonathan White (6121) Date SWiFT Controls Engineer Jonathan Berg (6121) Date CHANGE HISTORY Issue Date Originator(s) Description A 2016/01/27 Jon Berg (06121) Initial release of the SWiFT Software Quality Assurance Plan

  5. KCBX Quality Assurance Project Plan - October 2014

    Science.gov (United States)

    This revised plan's standards for data quality, sampling and testing methods, and task management guide the implementation of Ambient Air Monitoring by URS Corporation at the KCBX Terminals Company North and South Terminals in Chicago, Ill.

  6. KCBX Quality Assurance Project Plan - February 2014

    Science.gov (United States)

    This plan's standards for data quality, sampling and testing methods, and task management guide the implementation of Ambient Air Monitoring, by URS Corporation, at the KCBX Terminals Company North and South Terminals in Chicago, IL.

  7. Quality Assurance Project Plan Development Tool

    Science.gov (United States)

    This tool contains information designed to assist in developing a Quality Assurance (QA) Project Plan that meets EPA requirements for projects that involve surface or groundwater monitoring and/or the collection and analysis of water samples.

  8. Air Pollution Monitoring | Air Quality Planning & Standards ...

    Science.gov (United States)

    2016-06-08

    The basic mission of the Office of Air Quality Planning and Standards is to preserve and improve the quality of our nation's air. To accomplish this, OAQPS must be able to evaluate the status of the atmosphere as compared to clean air standards and historical information.

  9. Linking customer satisfaction, quality, and strategic planning

    OpenAIRE

    Reis, Dayr; Peña, Leticia

    2000-01-01

    By acknowledging and dissecting the interconnected roles of customer satisfaction, quality, and strategic planning, this paper provides an analytical framework for creating a customer-driven organization and culture. It shows how quality starts and ends with the customer. Companies that are achieving long-term continuous improvement in quality tailored to customer satisfaction possess lasting characteristics such as customer orientation, customer consciousness, and customer responsiveness. In...

  10. Directing a Quality Enhancement Plan

    Directory of Open Access Journals (Sweden)

    Ronald A. Styron, Jr.

    2015-08-01

    Full Text Available This paper is drawn from a project aimed at enhancing the quality of instructional practice and improving studentlearning outcomes in classes across an urban university located in the southern region of the United States. The strategies, employed by the project leader, are discussed in detail as framed by a new problem-solving leadership design called the Alloy Improvement Model (AIM. Data collected at the end of the second full year and reported in this paper indicated all project goals were met and that the utilization of the AIM was central to project success.

  11. An integrated approach to hospital strategic planning, quality assurance, and continuous quality improvement.

    Science.gov (United States)

    Day, G; Gardner, S; Herba, C

    1995-01-01

    Like many other healthcare organizations today, the authors' facility, a 306-bed acute care community hospital in Michigan, strives to visualize and make a transition from traditional quality assurance to continuous quality improvement. The Juran Trilogy provided the insight that strategic planning, measurement, and continuous improvement must exist side by side. At the authors' facility, this realization resulted in the hospital quality plan, which treats each of these components as part of the foundation for quality. The authors explain this model and the reporting and communication mechanisms that support it.

  12. Approved Air Quality Implementation Plans in Region 10

    Science.gov (United States)

    Landing page for information about EPA-approved air quality State Implementation Plans (SIPs), Tribal Implementation Plans (TIPs), and Federal Implementation Plans (FIPs) in Alaska, Idaho, Oregon, Washington.

  13. Strategic planning for hotel operations: The Ritz-Carlton Hotel Company (Part I).

    Science.gov (United States)

    Shriver, S J

    1993-01-01

    The Ritz-Carlton Hotel Company won the Malcolm Baldridge National Quality Award in 1992. One key to its success is its strategic planning process. This two-part article reviews the Ritz-Carlton's approach to strategic planning. In particular, it describes (1) the role of senior leadership in the planning process and (2) the specific activities that are associated with plan development and implementation.

  14. Research and development quality assurance planning

    Energy Technology Data Exchange (ETDEWEB)

    Hoke, P.B.

    1990-05-14

    Planning for quality assurance (QA) in research and development (R D) is like stealing eggs without waking up the chickens. The QA program should be as unobtrusive as possible. Researchers require a QA program that affords them an environment capable of supporting repeatable experiments with accurate data without unduly stifling their creative abilities. Careful advance planning ensures that the intensity of control provided by quality-related systems is commensurate with the importance and scope of the activities being performed. Good scientific practices applied to small bench-scale projects may require minimal additional controls. As projects increase in size and complexity the controls imposed through planning must, by necessity, be increased. Research and development QA planning, just like any other planning, involves all affected individuals. The application of control systems is determined by factors such as customer or sponsor requirements, the importance of an item or activity to the experiment's success, and the organizational complexity of the project. Many larger experiments are highly dependent on quality-related support activities such as calibration, engineering design, and inspection provided by organizations outside the R D group. Since, in most cases, the expense of support activities is taken directly from funds available for research, it is important for the researchers to be involved in the planning efforts to help determine and agree with the level of QA effort required. A single plan will often suffice for organizations engaged in large numbers of similar experiments. Complex experiments may require unique QA plans or additions to existing plans. Once implemented, the R D QA plans, like any others, require audits or surveillances and may require revisions if the scope of the experiment changes. 1 ref., 1 fig.

  15. Research and development quality assurance planning

    International Nuclear Information System (INIS)

    Hoke, P.B.

    1990-01-01

    Planning for quality assurance (QA) in research and development (R ampersand D) is like stealing eggs without waking up the chickens. The QA program should be as unobtrusive as possible. Researchers require a QA program that affords them an environment capable of supporting repeatable experiments with accurate data without unduly stifling their creative abilities. Careful advance planning ensures that the intensity of control provided by quality-related systems is commensurate with the importance and scope of the activities being performed. Good scientific practices applied to small bench-scale projects may require minimal additional controls. As projects increase in size and complexity the controls imposed through planning must, by necessity, be increased. Research and development QA planning, just like any other planning, involves all affected individuals. The application of control systems is determined by factors such as customer or sponsor requirements, the importance of an item or activity to the experiment's success, and the organizational complexity of the project. Many larger experiments are highly dependent on quality-related support activities such as calibration, engineering design, and inspection provided by organizations outside the R ampersand D group. Since, in most cases, the expense of support activities is taken directly from funds available for research, it is important for the researchers to be involved in the planning efforts to help determine and agree with the level of QA effort required. A single plan will often suffice for organizations engaged in large numbers of similar experiments. Complex experiments may require unique QA plans or additions to existing plans. Once implemented, the R ampersand D QA plans, like any others, require audits or surveillances and may require revisions if the scope of the experiment changes. 1 ref., 1 fig

  16. MIPPA: First Broad Changes to Medicare Part D Plan Operations.

    Science.gov (United States)

    LeMasurier, Jean D; Edgar, Babette

    2009-04-01

    In July 2008, as part of broad Medicare reform, Congress passed the first major legislative changes to Medicare Part D since its enactment in 2003-the Medicare Improvements for Patients and Providers Act. This new legislation has significant implications for how Part D plans can market and enroll Medicare beneficiaries. The new legislation also strengthened beneficiary protections, expanded the low-income subsidy provisions originally included in Part D, and expanded Part D coverage. These changes have significant implications for the operation of Part D plans and can affect those involved in benefit design, including specialty pharmacy coverage. This article discusses the major changes that took effect on January 1, 2009, and have immediate implications for Part D plan sponsors, including Medicare Advantage plans and stand-alone prescription drug plans.

  17. Quality assurance in dosimetry and treatment planning

    International Nuclear Information System (INIS)

    Cunningham, J.R.

    1984-01-01

    The considerations of tissue response to radiation absorbed dose suggest a need for an accuracy of +/-5% in its delivery. This is very demanding and its regular achievement requires careful quality control. There are three distinct phases to the delivery of the planned treatment: calibration of the radiation beam in a reference situation, calculation of the dose distribution for a patient relative to the reference dose and the delivery of the radiation to the patient as planned. Each has distinctly different quality assurance requirements and must be diligently observed if the desired accuracy is to be achieved

  18. Standard review plan for the review of environmental restoration remedial action quality assurance program plans

    International Nuclear Information System (INIS)

    1991-09-01

    This plan establishes both the scope of the review and the acceptance criteria to be utilized for the review of Quality Assurance Program Plans (QAPPs) developed in accordance with the requirements of DOE/RL-90-28. DOE/RL-90-28, the Environmental Restoration Remedial Action Quality Assurance Requirements Document (QARD) defines all quality assurance (QA) requirements governing activities that affect the quality of the Environmental Restoration Remedial Action (ERRA) program at the Hanford Site. These requirements are defined in three parts, Part 1 of Quality Management and Administration tasks, Part 2 for Environmental Data Operations, and Part 3 of the Design and Construction of items, systems, and facilities. The purpose of this document is to identify the scope of the review by the DOE Field Office, Richland staff, and establish the acceptance criteria (Parts 1, 2, and 3) that the DOE Field Office, Richland staff will utilize to evaluate the participant QAPPs. Use of the standard review plan will (1) help ensure that participant QAPPs contain the information required by DOE/RL-90-28, (2) aid program participant and DOE Field Office, Richland staff is ensuring that the information describing the participant's QAPP is complete, (3) help persons regarding DOE/RL- 90-28 to locate information, and (4) contribute to decreasing the time needed for the review process. In addition, the Standard Review Plan (SRP) ensures the quality and uniformity of the staff reviews and presents a well-defined base from which to evaluate compliance of participant quality programs against DOE/RL-90-28

  19. Quality Management Plan for the Environmental Assessment and Innovation Division

    Science.gov (United States)

    Quality management plan (QMP) which identifies the mission, roles, responsibilities of personnel with regard to quality assurance and quality management for the environmental assessment and innovation division.

  20. Process quality planning of quality function deployment for carrot syrup

    Science.gov (United States)

    Ekawati, Yurida; Noya, Sunday; Widjaja, Filemon

    2017-06-01

    Carrot products are rarely available in the market. Based on previous research that had been done using QFD to generate product design of carrots products, the research to produce the process quality planning had been carried out. The carrot product studied was carrot syrup. The research resulted in a process planning matrix for carrot syrup. The matrix gives information about critical process plan and the priority of the critical process plan. The critical process plan on the production process of carrot syrup consists of carrots sorting, carrots peeling, carrots washing, blanching process, carrots cutting, the making of pureed carrots, filtering carrot juice, the addition of sugar in carrot juice, the addition of food additives in carrot juice, syrup boiling, syrup filtering, syrup filling into the bottle, the bottle closure and cooling. The information will help the design of the production process of carrot syrup.

  1. MCNP trademark Software Quality Assurance plan

    International Nuclear Information System (INIS)

    Abhold, H.M.; Hendricks, J.S.

    1996-04-01

    MCNP is a computer code that models the interaction of radiation with matter. MCNP is developed and maintained by the Transport Methods Group (XTM) of the Los Alamos National Laboratory (LANL). This plan describes the Software Quality Assurance (SQA) program applied to the code. The SQA program is consistent with the requirements of IEEE-730.1 and the guiding principles of ISO 900

  2. Standard Review Plan for Environmental Restoration Program Quality Management Plans

    International Nuclear Information System (INIS)

    1993-12-01

    The Department of Energy, Richland Operations Office (RL) Manual Environmental Restoration Program Quality System Requirements (QSR) for the Hanford Site, defines all quality requirements governing Hanford Environmental Restoration (ER) Program activities. The QSR requires that ER Program participants develop Quality Management Plans (QMPs) that describe how the QSR requirements will be implemented for their assigned scopes of work. This standard review plan (SRP) describes the ER program participant responsibilities for submittal of QMPs to the RL Environmental Restoration Division for review and the RL methodology for performing the reviews of participant QMPS. The SRP serves the following functions: acts as a guide in the development or revision of QMPs to assure that the content is complete and adequate; acts as a checklist to be used by the RL staff in their review of participant QMPs; acts as an index or matrix between the requirements of the QSR and implementing methodologies described in the QMPs; decreases the time and subjectivity of document reviews; and provides a formal, documented method for describing exceptions, modifications, or waivers to established ER Program quality requirements

  3. Revision of Krsko NPP Quality Assurance Plan

    International Nuclear Information System (INIS)

    Biscan, R.; Fifnja, I.; Kavsek, D.

    2012-01-01

    International standards from nuclear power plant operation area are being frequently upgraded and revised in accordance with the continuous improvement philosophy. This philosophy applies also to the area of Quality Assurance, which has also undergone significant improvement since the early 1950s. Besides just nuclear industry, there are also other international quality standards that are being continuously developed and revised, bringing needs for upgrades also in the nuclear application. Since the beginning of Krsko NPP construction, the overall Quality Assurance program and its applicable procedures were in place to assure that all planned and systematic actions necessary to provide adequate confidence that an item or service will satisfy given requirements to quality, are in place. The overall requirements for quality as one of the major objectives for Krsko NPP operation are also set forth in the Updated Safety Analyses Report, the document that serves as a base for operating license. During more than 30 years of Krsko NPP operation, the quality requirements and related documents were revised and upgraded in several attempts. The latest revision 6 of QD-1, Quality Assurance Plan was issued during the year 2011. The bases for the revision were: Changes of the Slovenian regulatory requirements (ZVISJV, JV5, JV9?), Changes of Krsko NPP licensing documents (USAR section 13?), SNSA inspection requirements, Changes of international standards (IAEA, ISO?), Conclusions of first PSR, Implementation of ISO standards in Krsko NPP (ISO14001, ISO17025), Changes of plant procedures, etc. One of the most obvious changes was the enlargement of the QA Plan scope to cover interdisciplinary areas defined in the plant management program MD-1, such as Safety culture, Self-assessment, Human performance, Industrial Safety etc. The attachment of the QA Plan defining relationships between certain standards was also updated to provide matrix for better correlation of requirements of

  4. Career anchors and learning plan (part one

    Directory of Open Access Journals (Sweden)

    Daniela Brečko

    2006-12-01

    Full Text Available The article is divided into three parts. The first part concentrates on how important career is for an individual, organization and society. The author establishes that understanding of career has changed dramatically and does not only refer to climbing up the career ladder, but also moving off or even down the career ladder. The notion of career, as a lifelong and professional path, encompasses all aspects of human personality and their roles acquired through one's life. On basis of vast and longitudinal research, where the author has studied career anchors of individuals, it is the objective of the author to find out on basis of what grounds do the individuals decide to take certain directions in their careers and how learning contributes to such decisions. As a source the author has used Shein's theory of career anchors. Part one describes in greater detail 8 different career anchors and introduces their main features with the findings of the research, which refer to the analysis of professions (work positions and established career anchors. The author thus verifies the hypothesis that career anchors do exist in our area.

  5. 222-S laboratory quality assurance plan

    International Nuclear Information System (INIS)

    Meznarich, H.K.

    1995-01-01

    This document provides quality assurance guidelines and quality control requirements for analytical services. This document is designed on the basis of Hanford Analytical Services Quality Assurance Plan (HASQAP) technical guidelines and is used for governing 222-S and 222-SA analytical and quality control activities. The 222-S Laboratory provides analytical services to various clients including, but not limited to, waste characterization for the Tank Waste Remediation Systems (TWRS), waste characterization for regulatory waste treatment, storage, and disposal (TSD), regulatory compliance samples, radiation screening, process samples, and TPA samples. A graded approach is applied on the level of sample custody, QC, data verification, and data reporting to meet the specific needs of the client

  6. Hanford Tanks Initiative quality assurance implementation plan

    International Nuclear Information System (INIS)

    Huston, J.J.

    1998-01-01

    Hanford Tanks Initiative (HTI) Quality Assurance Implementation Plan for Nuclear Facilities defines the controls for the products and activities developed by HTI. Project Hanford Management Contract (PHMC) Quality Assurance Program Description (QAPD)(HNF-PRO599) is the document that defines the quality requirements for Nuclear Facilities. The QAPD provides direction for compliance to 10 CFR 830.120 Nuclear Safety Management, Quality Assurance Requirements. Hanford Tanks Initiative (HTI) is a five-year activity resulting from the technical and financial partnership of the US Department of Energy's Office of Waste Management (EM-30), and Office of Science and Technology Development (EM-50). HTI will develop and demonstrate technologies and processes for characterization and retrieval of single shell tank waste. Activities and products associated with HTI consist of engineering, construction, procurement, closure, retrieval, characterization, and safety and licensing

  7. 42 CFR 441.474 - Quality assurance and improvement plan.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 4 2010-10-01 2010-10-01 false Quality assurance and improvement plan. 441.474... improvement plan. (a) The State must provide a quality assurance and improvement plan that describes the State... pursue opportunities for system improvement. (b) The quality assurance and improvement plan shall also...

  8. 45 CFR 1304.60 - Deficiencies and quality improvement plans.

    Science.gov (United States)

    2010-10-01

    ... 45 Public Welfare 4 2010-10-01 2010-10-01 false Deficiencies and quality improvement plans. 1304... must correct the deficiency either immediately or pursuant to a Quality Improvement Plan. (c) An Early... Improvement Plan must submit to the responsible HHS official a Quality Improvement Plan specifying, for each...

  9. Software quality assurance plan for viscometer

    International Nuclear Information System (INIS)

    Gimera, M.

    1994-01-01

    The in situ viscometer is a portable instrument designed to raise and lower a sphere (rheometer ball) through layers of tank waste material while recording ball position, velocity, and cable tension. In the field, the viscometer attaches to a decontamination spool piece which in turn is designed to attach to any 4-inch, 150-pound flange (typical of many available tank risers). The motion of the ball and collection of data is controlled by instrumentation and control equipment housed in a separate remote control console. This document covers the product, Viscometer Data Acquisition Software. This document provides the software quality assurance plan, verification and validation plan, and configuration management plan for developing the software for the instrumentation that will be used to obtain rheology data from Tank SY-101

  10. Planning for rural energy system: Part 2

    International Nuclear Information System (INIS)

    Devadas, V.

    2001-01-01

    This paper discusses the central importance of energy inputs in development, and presents the complex interactions within subsystems that contribute a Rural Energy System. This paper also brings about the importance of the primary data for realistic renewable energy planning at the micro level in a given rural system. Factors that render secondary data somewhat inadequate for such applications are discussed. The differences between energy related data from secondary and primary sources in respect of representative villages in Kanyakumari District of Tamil Nadu, India, are detailed. A rural system model for computing the output from various components of a rural system is also presented. This projection is made by making use of a set of technical coefficients, which relate the inputs to the outputs from individual segments of the rural production system. While some of the technical coefficients are developed based on previously published data, a large number have been quantified on the basis of careful survey. The usefulness of the model is discussed. The paper also presents a Linear Programming Model for optimum resource allocation in a rural system. The objective function of the Linear Programming Model is maximizing the revenue of the rural system where in optimum resource allocation is made subject to a number of energy and non-energy related relevant constraints. The model also quantifies the major yields as well as the byproducts of different sectors of the rural economic system. (Author)

  11. Plan selection in Medicare Part D: Evidence from administrative data

    Science.gov (United States)

    Heiss, Florian; Leive, Adam; McFadden, Daniel; Winter, Joachim

    2014-01-01

    We study the Medicare Part D prescription drug insurance program as a bellwether for designs of private, non-mandatory health insurance markets, focusing on the ability of consumers to evaluate and optimize their choices of plans. Our analysis of administrative data on medical claims in Medicare Part D suggests that fewer than 25 percent of individuals enroll in plans that are ex ante as good as the least cost plan specified by the Plan Finder tool made available to seniors by the Medicare administration, and that consumers on average have expected excess spending of about $300 per year, or about 15 percent of expected total out-of-pocket cost for drugs and Part D insurance. These numbers are hard to reconcile with decision costs alone; it appears that unless a sizeable fraction of consumers place large values on plan features other than cost, they are not optimizing effectively. PMID:24308882

  12. Internal quality control: planning and implementation strategies.

    Science.gov (United States)

    Westgard, James O

    2003-11-01

    The first essential in setting up internal quality control (IQC) of a test procedure in the clinical laboratory is to select the proper IQC procedure to implement, i.e. choosing the statistical criteria or control rules, and the number of control measurements, according to the quality required for the test and the observed performance of the method. Then the right IQC procedure must be properly implemented. This review focuses on strategies for planning and implementing IQC procedures in order to improve the quality of the IQC. A quantitative planning process is described that can be implemented with graphical tools such as power function or critical-error graphs and charts of operating specifications. Finally, a total QC strategy is formulated to minimize cost and maximize quality. A general strategy for IQC implementation is recommended that employs a three-stage design in which the first stage provides high error detection, the second stage low false rejection and the third stage prescribes the length of the analytical run, making use of an algorithm involving the average of normal patients' data.

  13. A deterministic aggregate production planning model considering quality of products

    International Nuclear Information System (INIS)

    Madadi, Najmeh; Wong, Kuan Yew

    2013-01-01

    Aggregate Production Planning (APP) is a medium-term planning which is concerned with the lowest-cost method of production planning to meet customers' requirements and to satisfy fluctuating demand over a planning time horizon. APP problem has been studied widely since it was introduced and formulated in 1950s. However, in several conducted studies in the APP area, most of the researchers have concentrated on some common objectives such as minimization of cost, fluctuation in the number of workers, and inventory level. Specifically, maintaining quality at the desirable level as an objective while minimizing cost has not been considered in previous studies. In this study, an attempt has been made to develop a multi-objective mixed integer linear programming model that serves those companies aiming to incur the minimum level of operational cost while maintaining quality at an acceptable level. In order to obtain the solution to the multi-objective model, the Fuzzy Goal Programming approach and max-min operator of Bellman-Zadeh were applied to the model. At the final step, IBM ILOG CPLEX Optimization Studio software was used to obtain the experimental results based on the data collected from an automotive parts manufacturing company. The results show that incorporating quality in the model imposes some costs, however a trade-off should be done between the cost resulting from producing products with higher quality and the cost that the firm may incur due to customer dissatisfaction and sale losses.

  14. Near-Facility Environmental Monitoring Quality Assurance Project Plan

    International Nuclear Information System (INIS)

    MCKINNEY, S.M.

    2000-01-01

    This Quality Assurance Project Plan addresses the quality assurance requirements for the activities associated with the preoperational and near-facility environmental monitoring directed by Waste Management Technical Services and supersedes HNF-EP-0538-4. This plan applies to all sampling and monitoring activities performed by Waste Management Technical Services in implementing near-facility environmental monitoring at the Hanford Site. This Quality Assurance Project Plan is required by U.S. Department of Energy Order 5400.1 (DOE 1990) as a part of the Environmental Monitoring Plan (DOE-RL 1997) and is used to define: Environmental measurement and sampling locations used to monitor environmental contaminants near active and inactive facilities and waste storage and disposal sites; Procedures and equipment needed to perform the measurement and sampling; Frequency and analyses required for each measurement and sampling location; Minimum detection level and accuracy; Quality assurance components; and Investigation levels. Near-facility environmental monitoring for the Hanford Site is conducted in accordance with the requirements of U.S. Department of Energy Orders 5400.1 (DOE 1990), 5400.5 (DOE 1993), 5484.1 (DOE 1990), and 435.1 (DOE 1999), and DOE/EH-O173T (DOE 1991). It is Waste Management Technical Services' objective to manage and conduct near-facility environmental monitoring activities at the Hanford Site in a cost-effective and environmentally responsible manner that is in compliance with the letter and spirit of these regulations and other environmental regulations, statutes, and standards

  15. 76 FR 54384 - California State Implementation Plan, South Coast Air Quality Management District; Withdrawal of...

    Science.gov (United States)

    2011-09-01

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2011-0537; FRL-9457-6] California State Implementation Plan, South Coast Air Quality Management District; Withdrawal of Direct Final Rule... Implementation Plan (SIP). This revision concerned South Coast Air Quality Management District (SCAQMD) Rule 1143...

  16. 75 FR 32353 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2010-06-08

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2010-0276; FRL-9139-8] Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY... the South Coast Air Quality Management District portion of the California State Implementation Plan...

  17. 77 FR 32483 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2012-06-01

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2012-0236; FRL-9670-9] Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY... the South Coast Air Quality Management District portion of the California State Implementation Plan...

  18. 75 FR 25775 - Disapproval of State Implementation Plan Revisions, South Coast Air Quality Management District

    Science.gov (United States)

    2010-05-10

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2009-0573; FRL-9146-5] Disapproval of State Implementation Plan Revisions, South Coast Air Quality Management District AGENCY: Environmental... South Coast Air Quality Management District (SCAQMD) portion of the California State Implementation Plan...

  19. Quality assurance program description: Hanford Waste Vitrification Plant, Part 1

    International Nuclear Information System (INIS)

    1992-01-01

    This document describes the Department of Energy's Richland Field Office (DOE-RL) quality assurance (QA) program for the processing of high-level waste as well as the Vitrification Project Quality Assurance Program for the design and construction of the Hanford Waste Vitrification Plant (HWVP). It also identifies and describes the planned activities that constitute the required quality assurance program for the HWVP. This program applies to the broad scope of quality-affecting activities associated with the overall HWVP Facility. Quality-affecting activities include designing, purchasing, fabricating, handling, shipping, storing, cleaning, erecting, installing, inspecting, testing, maintaining, repairing, and modifying. Also included are the development, qualification, and production of waste forms which may be safely used to dispose of high-level radioactive waste resulting from national defense activities. The HWVP QA program is made up of many constituent programs that are being implemented by the participating organizations. This Quality Assurance program description is intended to outline and define the scope and application of the major programs that make up the HWVP QA program. It provides a means by which the overall program can be managed and directed to achieve its objectives. Subsequent parts of this description will identify the program's objectives, its scope, application, and structure

  20. Quality assurance for IAEA inspection planning

    International Nuclear Information System (INIS)

    Markin, J.T.

    1986-01-01

    Under the provisions of the Treaty on Nonproliferation of Nuclear Weapons and other agreements with states, the International Atomic Energy Agency (IAEA) conducts inspections at nuclear facilities to confirm that their operation is consistent with the peaceful use of nuclear material. The Department of Safeguards at the IAEA is considering a quality assurance program for activities related to the planning of these facility inspections. In this report, we summarize recent work in writing standards for planning inspections at the types of facilities inspected by the IAEA. The standards specify the sequence of steps in planning inspections, which are: (1) administrative functions, such as arrangements for visas and travel, and communications with the state to confirm facility operating schedules and the state's acceptance of the assigned inspectors; (2) technical functions including a specification of the required inspection activities, determination of personnel and equipment resources, and a schedule for implementing the inspection activities at the facility; and (3) management functions, such as pre- and post-inspection briefings, where the planned and implemented inspection activities are reviewed

  1. Quality of life after planned neck dissection

    International Nuclear Information System (INIS)

    Iwae, Shigemichi; Hirayama, Yuji; Komatsu, Hirokazu

    2009-01-01

    We evaluated the effect of planned neck dissection (PND) after concurrent chemoradiotherapy (CCRT) on quality of life (QOL) by using a self-administered neck dissection questionnaire and an arm abduction test. Subjects are fourteen patients who had undergone CCRT followed by planned selective neck dissection for the treatment of mesopharyngeal and hypopharyngeal cancer. The findings of the survey were compared with thirty-two patients who had undergone CCRT alone. Patients without PND had better scores on measures of pain, constriction, numbness and appearance of the neck, but had no advantage about arm abduction. After PND, the patients who had dissected dominant hand side had lower satisfaction compared with those who had dissected non-dominant hand side. (author)

  2. 40 CFR 35.2102 - Water quality management planning.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Water quality management planning. 35... Administrator shall first determine that the project is: (a) Included in any water quality management plan being implemented for the area under section 208 of the Act or will be included in any water quality management plan...

  3. 7 CFR 634.23 - Water quality plan.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 6 2010-01-01 2010-01-01 false Water quality plan. 634.23 Section 634.23 Agriculture... AGRICULTURE LONG TERM CONTRACTING RURAL CLEAN WATER PROGRAM Participant RCWP Contracts § 634.23 Water quality plan. (a) The participant's water quality plan, developed with technical assistance by the NRCS or its...

  4. SU-D-BRD-03: Improving Plan Quality with Automation of Treatment Plan Checks

    International Nuclear Information System (INIS)

    Covington, E; Younge, K; Chen, X; Lee, C; Matuszak, M; Kessler, M; Acosta, E; Orow, A; Filpansick, S; Moran, J; Keranen, W

    2015-01-01

    Purpose: To evaluate the effectiveness of an automated plan check tool to improve first-time plan quality as well as standardize and document performance of physics plan checks. Methods: The Plan Checker Tool (PCT) uses the Eclipse Scripting API to check and compare data from the treatment planning system (TPS) and treatment management system (TMS). PCT was created to improve first-time plan quality, reduce patient delays, increase efficiency of our electronic workflow, and to standardize and partially automate plan checks in the TPS. A framework was developed which can be configured with different reference values and types of checks. One example is the prescribed dose check where PCT flags the user when the planned dose and the prescribed dose disagree. PCT includes a comprehensive checklist of automated and manual checks that are documented when performed by the user. A PDF report is created and automatically uploaded into the TMS. Prior to and during PCT development, errors caught during plan checks and also patient delays were tracked in order to prioritize which checks should be automated. The most common and significant errors were determined. Results: Nineteen of 33 checklist items were automated with data extracted with the PCT. These include checks for prescription, reference point and machine scheduling errors which are three of the top six causes of patient delays related to physics and dosimetry. Since the clinical roll-out, no delays have been due to errors that are automatically flagged by the PCT. Development continues to automate the remaining checks. Conclusion: With PCT, 57% of the physics plan checklist has been partially or fully automated. Treatment delays have declined since release of the PCT for clinical use. By tracking delays and errors, we have been able to measure the effectiveness of automating checks and are using this information to prioritize future development. This project was supported in part by P01CA059827

  5. SU-D-BRD-03: Improving Plan Quality with Automation of Treatment Plan Checks

    Energy Technology Data Exchange (ETDEWEB)

    Covington, E; Younge, K; Chen, X; Lee, C; Matuszak, M; Kessler, M; Acosta, E; Orow, A; Filpansick, S; Moran, J [University of Michigan Hospital and Health System, Ann Arbor, MI (United States); Keranen, W [Varian Medical Systems, Palo Alto, CA (United States)

    2015-06-15

    Purpose: To evaluate the effectiveness of an automated plan check tool to improve first-time plan quality as well as standardize and document performance of physics plan checks. Methods: The Plan Checker Tool (PCT) uses the Eclipse Scripting API to check and compare data from the treatment planning system (TPS) and treatment management system (TMS). PCT was created to improve first-time plan quality, reduce patient delays, increase efficiency of our electronic workflow, and to standardize and partially automate plan checks in the TPS. A framework was developed which can be configured with different reference values and types of checks. One example is the prescribed dose check where PCT flags the user when the planned dose and the prescribed dose disagree. PCT includes a comprehensive checklist of automated and manual checks that are documented when performed by the user. A PDF report is created and automatically uploaded into the TMS. Prior to and during PCT development, errors caught during plan checks and also patient delays were tracked in order to prioritize which checks should be automated. The most common and significant errors were determined. Results: Nineteen of 33 checklist items were automated with data extracted with the PCT. These include checks for prescription, reference point and machine scheduling errors which are three of the top six causes of patient delays related to physics and dosimetry. Since the clinical roll-out, no delays have been due to errors that are automatically flagged by the PCT. Development continues to automate the remaining checks. Conclusion: With PCT, 57% of the physics plan checklist has been partially or fully automated. Treatment delays have declined since release of the PCT for clinical use. By tracking delays and errors, we have been able to measure the effectiveness of automating checks and are using this information to prioritize future development. This project was supported in part by P01CA059827.

  6. Surfscholar business plan: quality reigns supreme

    OpenAIRE

    Einstein, Samuel

    2016-01-01

    The following master’s thesis entails a business plan for a free service-based company aimed at helping American students to enroll in fulltime master’s programs in Lisbon, Portugal for a fraction of the price of what they would be paying at home. Combining a high-quality and internationally accredited education with world-class surf, exploration and cultural enrichment is the mission. The company, SurfScholar, will function on a per student commission basis which will allow it...

  7. Societal Planning: Identifying a New Role for the Transport Planner-Part II: Planning Guidelines

    DEFF Research Database (Denmark)

    Khisty, C. Jotin; Leleur, Steen

    1997-01-01

    The paper seeks to formulate planning guidelines based on Habermas's theory of communicative action. Specifically, this has led to the formulation of a set of four planning validity claims concerned to four types of planning guidelines concerning adequacy, dependency, suitability and adaptability......-a-vis the planning validity claims. Among other things the contingency of this process is outlined. It is concluded (part I & II) that transport planners can conveniently utilize the guidelines in their professional practice, tailored to their particular settings....

  8. 77 FR 3386 - Approval and Promulgation of Air Quality Implementation Plans; Pennsylvania; Clean Vehicles Program

    Science.gov (United States)

    2012-01-24

    ... Promulgation of Air Quality Implementation Plans; Pennsylvania; Clean Vehicles Program AGENCY: Environmental... vehicles (LEV II). The Clean Air Act (CAA) contains specific authority allowing any state to adopt new... CFR Part 52 Environmental protection, Air pollution control, Incorporation by reference...

  9. [Quality assurance and quality improvement in medical practice. Part 3: Clinical audit in medical practice].

    Science.gov (United States)

    Godény, Sándor

    2012-02-05

    The first two articles in the series were about the definition of quality in healthcare, the quality approach, the importance of quality assurance, the advantages of quality management systems and the basic concepts and necessity of evidence based medicine. In the third article the importance and basic steps of clinical audit are summarised. Clinical audit is an integral part of quality assurance and quality improvement in healthcare, that is the responsibility of any practitioner involved in medical practice. Clinical audit principally measures the clinical practice against clinical guidelines, protocols and other professional standards, and sometimes induces changes to ensure that all patients receive care according to principles of the best practice. The clinical audit can be defined also as a quality improvement process that seeks to identify areas for service improvement, develop and carry out plans and actions to improve medical activity and then by re-audit to ensure that these changes have an effect. Therefore, its aims are both to stimulate quality improvement interventions and to assess their impact in order to develop clinical effectiveness. At the end of the article key points of quality assurance and improvement in medical practice are summarised.

  10. The Best Laid Plans: An Examination of School Plan Quality and Implementation in a School Improvement Initiative

    Science.gov (United States)

    Strunk, Katharine O.; Marsh, Julie A.; Bush-Mecenas, Susan C.; Duque, Matthew R.

    2016-01-01

    Purpose: A common strategy used in school improvement efforts is a mandated process of formal planning, yet little is known about the quality of plans or the relationship between plan quality and implementation. This mixed-methods article investigates plan quality, factors associated with plan quality, and the relationship between plan quality and…

  11. Province of Ontario nuclear emergency plan part V - Chalk River

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1991-10-01

    The aim of Part 5 of the Provincial Nuclear Emergency Plan is to describe the measures that shall be undertaken to deal with a nuclear emergency caused by the Chalk River Laboratories. This plan deals mainly with actions at the Provincial level and shall by supplemented by the appropriate Municipal Plan. The Townships of Rolph, Buchanan, Wylie, and McKay, the Town of Deep River and the Village of Chalk River are the designated municipalities with respect to CRL. 2 tabs., 5 figs.

  12. Province of Ontario nuclear emergency plan part V - Chalk River

    International Nuclear Information System (INIS)

    1991-10-01

    The aim of Part 5 of the Provincial Nuclear Emergency Plan is to describe the measures that shall be undertaken to deal with a nuclear emergency caused by the Chalk River Laboratories. This plan deals mainly with actions at the Provincial level and shall by supplemented by the appropriate Municipal Plan. The Townships of Rolph, Buchanan, Wylie, and McKay, the Town of Deep River and the Village of Chalk River are the designated municipalities with respect to CRL. 2 tabs., 5 figs

  13. Hanford Sampling Quality Management Plan (HSQMP)

    International Nuclear Information System (INIS)

    Hyatt, J.E.

    1995-01-01

    This document provides a management tool for evaluating and designing the appropriate elements of a field sampling program. This document provides discussion of the elements of a program and is to be used as a guidance document during the preparation of project and/or function specific documentation. This document does not specify how a sampling program shall be organized. The HSQMP is to be used as a companion document to the Hanford Analytical Services Quality Assurance Plan (HASQAP) DOE/RL-94-55. The generation of this document was enhanced by conducting baseline evaluations of current sampling organizations. Valuable input was received from members of field and Quality Assurance organizations. The HSQMP is expected to be a living document. Revisions will be made as regulations and or Hanford Site conditions warrant changes in the best management practices. Appendices included are: summary of the sampling and analysis work flow process, a user's guide to the Data Quality Objective process, and a self-assessment checklist

  14. QUALITY FUNCTION DEPLOYMENT AS A STRATEGIC PLANNING TOOL

    OpenAIRE

    DEVRİM İÇTENBAŞ, Burcu; ERYILMAZ, Hande

    2011-01-01

    Quality Function Deployment (QFD) uses a house of quality to translate customer requirements into engineering specifications. QFD has been widely used as a tool to develop new products. It has been adopted in the fields of education quality, service quality, software development and marketing planning. The tool has recently been applied in strategic planning .In this study authors reviewed current research which uses QFD as a strategic planning tool and described how QFD methods can be ...

  15. A new plan quality index for nasopharyngeal cancer SIB IMRT.

    Science.gov (United States)

    Jin, X; Yi, J; Zhou, Y; Yan, H; Han, C; Xie, C

    2014-02-01

    A new plan quality index integrating dosimetric and radiobiological indices was proposed to facilitate the evaluation and comparison of simultaneous integrated boost (SIB) intensity modulated radiotherapy (IMRT) plans for nasopharyngeal cancer (NPC) patients. Ten NPC patients treated by SIB-IMRT were enrolled in the study. Custom software was developed to read dose-volume histogram (DVH) curves from the treatment planning system (TPS). A plan filtering matrix was introduced to filter plans that fail to satisfy treatment protocol. Target plan quality indices and organ at risk (OAR) plan quality indices were calculated for qualified plans. A unique composite plan quality index (CPQI) was proposed based on the relative weight of these indices to evaluate and compare competing plans. Plan ranking results were compared with detailed statistical analysis, radiation oncology quality system (ROQS) scoring results and physician's evaluation results to verify the accuracy of this new plan quality index. The average CPQI values for plans with OAR priority of low, normal, high, and PTV only were 0.22 ± 0.08, 0.49 ± 0.077, 0.71 ± 0.062, and -0.21 ± 0.16, respectively. There were significant differences among these plan quality indices (One-way ANOVA test, p plans were selected. Plan filtering matrix was able to speed up the plan evaluation process. The new matrix plan quality index CPQI showed good consistence with physician ranking results. It is a promising index for NPC SIB-IMRT plan evaluation. Copyright © 2013 Associazione Italiana di Fisica Medica. Published by Elsevier Ltd. All rights reserved.

  16. SAPHIRE 8 Software Quality Assurance Plan

    Energy Technology Data Exchange (ETDEWEB)

    Curtis Smith

    2010-02-01

    This Quality Assurance (QA) Plan documents the QA activities that will be managed by the INL related to JCN N6423. The NRC developed the SAPHIRE computer code for performing probabilistic risk assessments (PRAs) using a personal computer (PC) at the Idaho National Laboratory (INL) under Job Code Number (JCN) L1429. SAPHIRE started out as a feasibility study for a PRA code to be run on a desktop personal PC and evolved through several phases into a state-of-the-art PRA code. The developmental activity of SAPHIRE was the result of two concurrent important events: The tremendous expansion of PC software and hardware capability of the 90s and the onset of a risk-informed regulation era.

  17. Quality of Family Planning Services in Primary Health Centers of ...

    African Journals Online (AJOL)

    Background: Good quality of care in family planning (FP) services help individuals and couples to meet their reproductive health needs safely and effectively. Therefore, assessment and improvement of the quality of family planning services could enhance family planning services utilization. This study was thus conducted ...

  18. Financial planning in the Northern Division of the UKAEA. Part 1 - The organisation and its finance. Part 2 -Planning

    International Nuclear Information System (INIS)

    Williams, N.; D'Eye, R.W.M.

    1978-01-01

    In the first part of the lecture the background and functions of the UKAEA, the relationship between management and the nuclear industry, and the management structure are explained. The financial cycle of the UKAEA is shown together with a breakdown of expenditure of the Northern Division between directorates and also between projects. In the second part, the constraints which influence the management of the Authority are discussed. The role of the Northern Division Planning and Resources Branch is explained and the methods of operation of its two sections ie Planning, and Resources Analysis and Forecasting, are described. (U.K.)

  19. 78 FR 53270 - Revision of Air Quality Implementation Plan; California; Sacramento Metropolitan Air Quality...

    Science.gov (United States)

    2013-08-29

    ... Quality Implementation Plan; California; Sacramento Metropolitan Air Quality Management District... to the Sacramento Metropolitan Air Quality Management District (SMAQMD or District) portion of the..., Sacramento Metropolitan Air Quality Management District, Rule 214 (Federal New Source Review), Rule 203...

  20. 3-D conformal radiation therapy - Part I: Treatment planning

    International Nuclear Information System (INIS)

    Burman, Chandra M.; Mageras, Gikas S.

    1997-01-01

    Objective: In this presentation we will look into the basic components of 3-dimensional conformal treatment planning, and will discuss planning for some selected sites. We will also review some current and future trends in 3-D treatment planning. External beam radiation therapy is one of the arms of cancer treatment. In the recent years 3-D conformal therapy had significant impact on the practice of external beam radiation therapy. Conformal radiation therapy shapes the high-dose volume so as to conform to the target volume while minimizing the dose to the surrounding normal tissues. The advances that have been achieved in conformal therapy are in part due to the development of 3-D treatment planning, which in turn has capitalized on 3-D imaging for tumor and normal tissue localization, as well as on available computational power for the calculation of 3-D dose distributions, visualization of anatomical and dose volumes, and numerical evaluation of treatment plans. In this course we will give an overview of how 3-D conformal treatments are designed and transferred to the patient. Topics will include: 1) description of the major components of a 3-D treatment planning system, 2) techniques for designing treatments, 3) evaluation of treatment plans using dose distribution displays, dose-volume histograms and normal tissue complication probabilities, 4) implementation of treatments using shaped blocks and multileaf collimators, 5) verification of treatment delivery using portal films and electronic portal imaging devices. We will also discuss some current and future trends in 3-D treatment planning, such as field shaping with multileaf collimation, computerized treatment plan optimization, including the use of nonuniform beam profiles (intensity modulation), and incorporating treatment uncertainties due to patient positioning errors and organ motion into treatment planning process

  1. Quality assurance program plan for radionuclide airborne emissions monitoring

    International Nuclear Information System (INIS)

    Boom, R.J.

    1995-12-01

    This Quality Assurance Program Plan identifies quality assurance program requirements and addresses the various Westinghouse Hanford Company organizations and their particular responsibilities in regards to sample and data handling of radiological airborne emissions. This Quality Assurance Program Plan is prepared in accordance with and to written requirements

  2. 40 CFR 35.2023 - Water quality management planning.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Water quality management planning. 35... to the States to carry out water quality management planning including but not limited to: (1... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2023 Water quality...

  3. Diagnosing Total Quality Management. Part I

    NARCIS (Netherlands)

    Bossink, B.A.G.; Gieskes, J.F.B.; Pas, T.N.M.

    1992-01-01

    From extensive literature research a total quality management (TQM) model is developed. This model describes the basic elements of the concept of TQM. It also provides the way in which the basic elements can be made operational in practice. Based on this model a quality-diagnostical instrument is

  4. Diagnosing Total Quality Management - part 2

    NARCIS (Netherlands)

    Bossink, B.A.G.; Gieskes, J.F.B.; Pas, T.N.M.

    1993-01-01

    From extensive literature research a total quality management (TQM) model is developed. This model describes the basic elements of the concept of TQM. It also provides the way in which the basic elements can be made operational in practice. Based on this model a quality-diagnostical instrument is

  5. Quality Assurance Project Plan for Citizen Science Projects

    Science.gov (United States)

    The Quality Assurance Project Plan is necessary for every project that collects or uses environmental data. It documents the project planning process and serves as a blueprint for how your project will run.

  6. Improved Planning Time and Plan Quality Through Multicriteria Optimization for Intensity-Modulated Radiotherapy

    International Nuclear Information System (INIS)

    Craft, David L.; Hong, Theodore S.; Shih, Helen A.; Bortfeld, Thomas R.

    2012-01-01

    Purpose: To test whether multicriteria optimization (MCO) can reduce treatment planning time and improve plan quality in intensity-modulated radiotherapy (IMRT). Methods and Materials: Ten IMRT patients (5 with glioblastoma and 5 with locally advanced pancreatic cancers) were logged during the standard treatment planning procedure currently in use at Massachusetts General Hospital (MGH). Planning durations and other relevant planning information were recorded. In parallel, the patients were planned using an MCO planning system, and similar planning time data were collected. The patients were treated with the standard plan, but each MCO plan was also approved by the physicians. Plans were then blindly reviewed 3 weeks after planning by the treating physician. Results: In all cases, the treatment planning time was vastly shorter for the MCO planning (average MCO treatment planning time was 12 min; average standard planning time was 135 min). The physician involvement time in the planning process increased from an average of 4.8 min for the standard process to 8.6 min for the MCO process. In all cases, the MCO plan was blindly identified as the superior plan. Conclusions: This provides the first concrete evidence that MCO-based planning is superior in terms of both planning efficiency and dose distribution quality compared with the current trial and error–based IMRT planning approach.

  7. Revisit, revamp and revitalize your business plan: part 1.

    Science.gov (United States)

    Waldron, David

    2011-01-01

    The diagnostic imaging department has a pivotal role within the hospital and its pillar services. Understanding this role and also understanding the population served helps to further define and justify the "what" and "why" of the business plan. Understand the market capacity and how market needs can be satisfied. Develop a "go-to-market" strategy, which is the part of the business plan where it is decided how to share that message with the market. In the aftermath of healthcare reform and the economic recession, investing in new imaging technology has never been under greater scrutiny. A three step process for developing support is provided.

  8. [Comparative quality measurements part 3: funnel plots].

    Science.gov (United States)

    Kottner, Jan; Lahmann, Nils

    2014-02-01

    Comparative quality measurements between organisations or institutions are common. Quality measures need to be standardised and risk adjusted. Random error must also be taken adequately into account. Rankings without consideration of the precision lead to flawed interpretations and enhances "gaming". Application of confidence intervals is one possibility to take chance variation into account. Funnel plots are modified control charts based on Statistical Process Control (SPC) theory. The quality measures are plotted against their sample size. Warning and control limits that are 2 or 3 standard deviations from the center line are added. With increasing group size the precision increases and so the control limits are forming a funnel. Data points within the control limits are considered to show common cause variation; data points outside special cause variation without the focus of spurious rankings. Funnel plots offer data based information about how to evaluate institutional performance within quality management contexts.

  9. Noncoplanar VMAT for nasopharyngeal tumors: Plan quality versus treatment time

    International Nuclear Information System (INIS)

    Wild, Esther; Bangert, Mark; Nill, Simeon; Oelfke, Uwe

    2015-01-01

    Purpose: The authors investigated the potential of optimized noncoplanar irradiation trajectories for volumetric modulated arc therapy (VMAT) treatments of nasopharyngeal patients and studied the trade-off between treatment plan quality and delivery time in radiation therapy. Methods: For three nasopharyngeal patients, the authors generated treatment plans for nine different delivery scenarios using dedicated optimization methods. They compared these scenarios according to dose characteristics, number of beam directions, and estimated delivery times. In particular, the authors generated the following treatment plans: (1) a 4π plan, which is a not sequenced, fluence optimized plan that uses beam directions from approximately 1400 noncoplanar directions and marks a theoretical upper limit of the treatment plan quality, (2) a coplanar 2π plan with 72 coplanar beam directions as pendant to the noncoplanar 4π plan, (3) a coplanar VMAT plan, (4) a coplanar step and shoot (SnS) plan, (5) a beam angle optimized (BAO) coplanar SnS IMRT plan, (6) a noncoplanar BAO SnS plan, (7) a VMAT plan with rotated treatment couch, (8) a noncoplanar VMAT plan with an optimized great circle around the patient, and (9) a noncoplanar BAO VMAT plan with an arbitrary trajectory around the patient. Results: VMAT using optimized noncoplanar irradiation trajectories reduced the mean and maximum doses in organs at risk compared to coplanar VMAT plans by 19% on average while the target coverage remains constant. A coplanar BAO SnS plan was superior to coplanar SnS or VMAT; however, noncoplanar plans like a noncoplanar BAO SnS plan or noncoplanar VMAT yielded a better plan quality than the best coplanar 2π plan. The treatment plan quality of VMAT plans depended on the length of the trajectory. The delivery times of noncoplanar VMAT plans were estimated to be 6.5 min in average; 1.6 min longer than a coplanar plan but on average 2.8 min faster than a noncoplanar SnS plan with comparable

  10. Noncoplanar VMAT for nasopharyngeal tumors: Plan quality versus treatment time

    Energy Technology Data Exchange (ETDEWEB)

    Wild, Esther, E-mail: e.wild@dkfz.de; Bangert, Mark [Department of Medical Physics in Radiation Oncology, German Cancer Research Center, Im Neuenheimer Feld 280, D-69120 Heidelberg (Germany); Nill, Simeon [Joint Department of Physics at The Institute of Cancer Research and The Royal Marsden NHS Foundation Trust, London SM2 5NG (United Kingdom); Oelfke, Uwe [Joint Department of Physics at The Institute of Cancer Research and The Royal Marsden NHS Foundation Trust, London SM2 5NG, United Kingdom and Department of Medical Physics in Radiation Oncology, German Cancer Research Center, Im Neuenheimer Feld 280, D-69120 Heidelberg (Germany)

    2015-05-15

    Purpose: The authors investigated the potential of optimized noncoplanar irradiation trajectories for volumetric modulated arc therapy (VMAT) treatments of nasopharyngeal patients and studied the trade-off between treatment plan quality and delivery time in radiation therapy. Methods: For three nasopharyngeal patients, the authors generated treatment plans for nine different delivery scenarios using dedicated optimization methods. They compared these scenarios according to dose characteristics, number of beam directions, and estimated delivery times. In particular, the authors generated the following treatment plans: (1) a 4π plan, which is a not sequenced, fluence optimized plan that uses beam directions from approximately 1400 noncoplanar directions and marks a theoretical upper limit of the treatment plan quality, (2) a coplanar 2π plan with 72 coplanar beam directions as pendant to the noncoplanar 4π plan, (3) a coplanar VMAT plan, (4) a coplanar step and shoot (SnS) plan, (5) a beam angle optimized (BAO) coplanar SnS IMRT plan, (6) a noncoplanar BAO SnS plan, (7) a VMAT plan with rotated treatment couch, (8) a noncoplanar VMAT plan with an optimized great circle around the patient, and (9) a noncoplanar BAO VMAT plan with an arbitrary trajectory around the patient. Results: VMAT using optimized noncoplanar irradiation trajectories reduced the mean and maximum doses in organs at risk compared to coplanar VMAT plans by 19% on average while the target coverage remains constant. A coplanar BAO SnS plan was superior to coplanar SnS or VMAT; however, noncoplanar plans like a noncoplanar BAO SnS plan or noncoplanar VMAT yielded a better plan quality than the best coplanar 2π plan. The treatment plan quality of VMAT plans depended on the length of the trajectory. The delivery times of noncoplanar VMAT plans were estimated to be 6.5 min in average; 1.6 min longer than a coplanar plan but on average 2.8 min faster than a noncoplanar SnS plan with comparable

  11. Quality Assurance Program Plan for FFTF effluent controls. Revision 1

    International Nuclear Information System (INIS)

    Seamans, J.A.

    1995-01-01

    This Quality Assurance Program Plan is specific to environmental related activities within the FFTF Property Protected Area. The activities include effluent monitoring and Low Level Waste Certification

  12. 77 FR 64445 - Approval and Promulgation of Air Quality Implementation Plans; Illinois; Greif Packaging, LLC...

    Science.gov (United States)

    2012-10-22

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R05-OAR-2012-0541; FRL 9733-5] Approval and Promulgation of Air Quality Implementation Plans; Illinois; Greif Packaging, LLC Adjusted Standard AGENCY... Illinois State Implementation Plan (SIP) an adjusted standard for the Greif Packaging, LLC facility located...

  13. 78 FR 28550 - Approval and Promulgation of Air Quality Implementation Plans; Indiana; Lake and Porter Counties...

    Science.gov (United States)

    2013-05-15

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R05-OAR-2013-0021;EPA-R05-OAR-2013-0022; FRL-9812-3] Approval and Promulgation of Air Quality Implementation Plans; Indiana; Lake and Porter... Porter State Implementation Plans (SIPs) for the 1997 8-hour ozone standard, and the 1997 annual fine...

  14. References on EPA Quality Assurance Project Plans

    Science.gov (United States)

    Provides requirements for the conduct of quality management practices, including quality assurance (QA) and quality control (QC) activities, for all environmental data collection and environmental technology programs performed by or for this Agency.

  15. Environmental surveillance: An integral part of the spill contingency plan

    International Nuclear Information System (INIS)

    Salinas, J.; Bozzo, W.

    1993-01-01

    Typically, the initial response to spills is directed at containing, controlling, and stopping the flow of spilled materials. The primary goal of such a response is to limit the spread and further impact of spilled material, and to initiate timely cleanup and recovery of affected areas. Surveillance of actual spill impacts has often followed an after the fact approach, using only immediately available resources. Surveillance may occur quickly after a spill, but in most incidents its occurs as a follow-up action after initial response and containment have been achieved. Insufficient planning may produce spill surveillance that inadequately assesses impacts, fails to incorporate baseline data, and does not clearly identify a cleanup recovery and endpoint. The management and operations contractor for the US Dept. of Energy's Strategic Petroleum Reserve (SPR) conducts environmental surveillance activities in response to spill incidents when they occur at these facilities. These surveillance activities, when conducted as part of the response, are useful instruments in the initial assessment of spill incidents, management of spill response, containment, and cleanup activities, and for monitoring and documenting postspill impacts and recovery. An Environmental Surveillance Plan (ESP) incorporated in the SPR Spill Contingency Plan provides for initiation of environmental surveillance as part of the spill response. The ESP outlines, through alogic tree, conditions for activating the plan, key indicator parameters for evaluation, detailed methods for establishing surveillance stations, lists of key personnel, locations of equipment necessary to perform surveillance, and conditions for termination of environmental surveillance

  16. EPA Region 3 Quality Management Plans

    Science.gov (United States)

    Has links to resources that describe the Region's Quality Assurance Program, which is a collection of the Region's ongoing quality assurance (QA) policies, procedures, responsibilities and management systems.

  17. Spatial audio quality perception (part 2)

    DEFF Research Database (Denmark)

    Conetta, R.; Brookes, T.; Rumsey, F.

    2015-01-01

    location, envelopment, coverage angle, ensemble width, and spaciousness. They can also impact timbre, and changes to timbre can then influence spatial perception. Previously obtained data was used to build a regression model of perceived spatial audio quality in terms of spatial and timbral metrics...

  18. 78 FR 10589 - Revision of Air Quality Implementation Plan; California; Sacramento Metropolitan Air Quality...

    Science.gov (United States)

    2013-02-14

    ... Quality Implementation Plan; California; Sacramento Metropolitan Air Quality Management District... Sacramento Metropolitan Air Quality Management District (SMAQMD or District) portion of the California State... sources within the areas covered by the plan as necessary to assure that the National Ambient Air Quality...

  19. 77 FR 73320 - Approval of Air Quality Implementation Plans; California; South Coast Air Quality Management...

    Science.gov (United States)

    2012-12-10

    ... Quality Implementation Plans; California; South Coast Air Quality Management District; Prevention of... Implementation Plan (SIP) revision for the South Coast Air Quality Management District (SCAQMD or District... in a August 15, 2012 letter from the South Coast Air Quality Management District regarding specific...

  20. 77 FR 2496 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Science.gov (United States)

    2012-01-18

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2011-0987; FRL-9617-5] Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management District and Imperial... rule. SUMMARY: EPA is proposing to approve revisions to the Antelope Valley Air Quality Management...

  1. 76 FR 41744 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2011-07-15

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2011-0537; FRL-9432-1] Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY... the South Coast Air Quality Management District (SCAQMD) portion of the California State...

  2. 76 FR 29182 - Revisions to the California State Implementation Plan, Mojave Desert Air Quality Management District

    Science.gov (United States)

    2011-05-20

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2011-0030; FRL-9308-4] Revisions to the California State Implementation Plan, Mojave Desert Air Quality Management District AGENCY... the Mojave Desert Air Quality Management District (MDAQMD) portion of the California State...

  3. 75 FR 46880 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2010-08-04

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2010-0503; FRL-9183-5] Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY... the South Coast Air Quality Management District (SCAQMD) portion of the California State...

  4. 76 FR 78871 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2011-12-20

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2011-0897; FRL-9499-8] Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY... the South Coast Air Quality Management District (SCAQMD) portion of the California State...

  5. 78 FR 49992 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Science.gov (United States)

    2013-08-16

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2013-0394; FRL-9845-4] Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management District and Ventura... rule. SUMMARY: EPA is proposing to approve revisions to the Antelope Valley Air Quality Management...

  6. 76 FR 38589 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Science.gov (United States)

    2011-07-01

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2011-0383; FRL-9428-1] Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management District AGENCY... the Antelope Valley Air Quality Management District (AVAQMD) portion of the California State...

  7. 75 FR 25798 - Revisions to the California State Implementation Plan, Yolo Solano Air Quality Management District

    Science.gov (United States)

    2010-05-10

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2010-0286; FRL-9138-7] Revisions to the California State Implementation Plan, Yolo Solano Air Quality Management District AGENCY... the Yolo-Solano Air Quality Management District (YSAQMD) portion of the California State...

  8. 78 FR 69337 - Approval and Promulgation of Air Quality Implementation Plans; Ohio; Ohio SO2

    Science.gov (United States)

    2013-11-19

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R05-OAR-2011-0672; FRL-9902-02-Region 5] Approval and Promulgation of Air Quality Implementation Plans; Ohio; Ohio SO2 Air Quality Rule Revisions AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: On June 24, 2011, Ohio...

  9. 78 FR 69299 - Approval and Promulgation of Air Quality Implementation Plans; Ohio; Ohio SO2

    Science.gov (United States)

    2013-11-19

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R05-OAR-2011-0672; FRL-9902-03-Region 5] Approval and Promulgation of Air Quality Implementation Plans; Ohio; Ohio SO2 Air Quality Rule Revisions AGENCY: Environmental Protection Agency (EPA). ACTION: Direct final rule. SUMMARY: On June 24, 2011, Ohio...

  10. 40 CFR 64.8 - Quality improvement plan (QIP) requirements.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 15 2010-07-01 2010-07-01 false Quality improvement plan (QIP... PROGRAMS (CONTINUED) COMPLIANCE ASSURANCE MONITORING § 64.8 Quality improvement plan (QIP) requirements. (a.... (iii) Appropriate improvements to control methods. (iv) Other steps appropriate to correct control...

  11. Quality of family planning services in Northwest Ethiopia | Fantahun ...

    African Journals Online (AJOL)

    Background: The unmet need for family planning services in Ethiopia is believed to be high (36%) while the already available services do not appear to be optimally used by potential clients. It is thus expected that an assessment and improvement of the quality of family planning services could enhance family planning ...

  12. NIF Projects Controls and Information Systems Software Quality Assurance Plan

    Energy Technology Data Exchange (ETDEWEB)

    Fishler, B

    2011-03-18

    Quality achievement for the National Ignition Facility (NIF) and the National Ignition Campaign (NIC) is the responsibility of the NIF Projects line organization as described in the NIF and Photon Science Directorate Quality Assurance Plan (NIF QA Plan). This Software Quality Assurance Plan (SQAP) is subordinate to the NIF QA Plan and establishes quality assurance (QA) activities for the software subsystems within Controls and Information Systems (CIS). This SQAP implements an activity level software quality assurance plan for NIF Projects as required by the LLNL Institutional Software Quality Assurance Program (ISQAP). Planned QA activities help achieve, assess, and maintain appropriate quality of software developed and/or acquired for control systems, shot data systems, laser performance modeling systems, business applications, industrial control and safety systems, and information technology systems. The objective of this SQAP is to ensure that appropriate controls are developed and implemented for management planning, work execution, and quality assessment of the CIS organization's software activities. The CIS line organization places special QA emphasis on rigorous configuration control, change management, testing, and issue tracking to help achieve its quality goals.

  13. NIF Projects Controls and Information Systems Software Quality Assurance Plan

    International Nuclear Information System (INIS)

    Fishler, B.

    2011-01-01

    Quality achievement for the National Ignition Facility (NIF) and the National Ignition Campaign (NIC) is the responsibility of the NIF Projects line organization as described in the NIF and Photon Science Directorate Quality Assurance Plan (NIF QA Plan). This Software Quality Assurance Plan (SQAP) is subordinate to the NIF QA Plan and establishes quality assurance (QA) activities for the software subsystems within Controls and Information Systems (CIS). This SQAP implements an activity level software quality assurance plan for NIF Projects as required by the LLNL Institutional Software Quality Assurance Program (ISQAP). Planned QA activities help achieve, assess, and maintain appropriate quality of software developed and/or acquired for control systems, shot data systems, laser performance modeling systems, business applications, industrial control and safety systems, and information technology systems. The objective of this SQAP is to ensure that appropriate controls are developed and implemented for management planning, work execution, and quality assessment of the CIS organization's software activities. The CIS line organization places special QA emphasis on rigorous configuration control, change management, testing, and issue tracking to help achieve its quality goals.

  14. 76 FR 51922 - Approval and Promulgation of Air Quality Implementation Plans; Maryland; Adoption of Plastic...

    Science.gov (United States)

    2011-08-19

    ... Technology Transfer and Advancement Act of 1995 (15 U.S.C. 272 note) because application of those... Promulgation of Air Quality Implementation Plans; Maryland; Adoption of Plastic Parts and Business Machines..., Plastic Parts and Business Machines Coating. Maryland's SIP revision meets the requirement to adopt...

  15. PLANNING THE QUALITY OF LIFE FOR TIMISOARA GROWTH POLE

    Directory of Open Access Journals (Sweden)

    Cătălina-Livia POPA

    2014-06-01

    Full Text Available This paper aims to show that planning the quality of life at local level through economic development can be a new approach for policy makers and community in improving quality of life. In this purpose, the Quality Function Deployment (QFD model will be use to planning the quality of life and to identify the main directions of economic development to support improving the quality of life at the level of Timisoara Growth Pole from Romania. The dimensions of quality of life are analyzed starting from the point of view of inhabitants. The results include a new approach in which the dimensions of quality of life are the key element that orients economic development in order to improve the quality of life of human being. The case study results refer to the main elements of quality of life at Timisoara Growth Pole and the relevant directions of economic development to improve the quality of life for Timisoara Growth Pole.

  16. Quality Management Plan for EPA Region 1

    Science.gov (United States)

    The QMP describes policies, procedures & management systems within EPA NE that govern quality assurance & quality control activities supporting the transparency & scientific defensibility of environmental data collected, used & disseminated by the Region.

  17. Software quality assurance plan for PORFLOW-3D

    International Nuclear Information System (INIS)

    Maheras, S.J.

    1993-03-01

    This plan describes the steps taken by the Idaho National Engineering Laboratory Subsurface and Environmental Modeling Unit personnel to implement software quality assurance procedures for the PORFLOW-3D computer code. PORFLOW-3D was used to conduct radiological performance assessments at the Savannah River Site. software quality assurance procedures for PORFLOW-3D include software acquisition, installation, testing, operation, maintenance, and retirement. Configuration control and quality assurance procedures are also included or referenced in this plan

  18. Legacy Management CERCLA Sites. Quality Assurance Project Plan

    International Nuclear Information System (INIS)

    2007-01-01

    S.M. Stoller Corporation is the contractor for the Technical Assistance Contract (TAC) for the U.S. Department of Energy (DOE) Office of Legacy Management (LM) operations. Stoller employs a management system that applies to all programs, projects, and business management systems funded through DOE-LM task orders. The management system incorporates the philosophy, policies, and requirements of health and safety, environmental compliance, and quality assurance (QA) in all aspects of project planning and implementation. Health and safety requirements are documented in the Health and Safety Manual (STO 2), the Radiological Control Manual (STO 3), the Integrated Safety Management System Description (STO 10), and the Drilling Health and Safety Requirements (STO 14). Environmental compliance policy and requirements are documented in the Environmental Management Program Implementation Manual (STO 11). The QA Program is documented in the Quality Assurance Manual (STO 1). The QA Manual (STO 1) implements the specific requirements and philosophy of DOE Order 414.1C, Quality Assurance. This manual also includes the requirements of other standards that are regularly imposed by customers, regulators, or other DOE orders. Title 10 Code of Federal Regulations Part 830, 'Quality Assurance Requirements', ANSI/ASQC E4-2004, 'Quality Systems for Environmental Data and Technology Programs - Requirements with Guidance for Use', and ISO 14001-2004, 'Environmental Management Systems', have been included. These standards are similar in content. The intent of the QA Manual (STO 1) is to provide a QA management system that incorporates the requirements and philosophy of DOE and other customers within the QA Manual. Criterion 1, 'Quality Assurance Program', identifies the fundamental requirements for establishing and implementing the QA management system; QA Instruction (QAI) 1.1, 'QA Program Implementation', identifies the TAC organizations that have responsibility for implementing the QA

  19. Identifying Contractors’ Planned Quality Costs in Indonesian Construction Projects

    Directory of Open Access Journals (Sweden)

    Puti F. Marzuki

    2014-12-01

    Full Text Available In a very competitive construction industry, quality costs have to be measured to be able to identify potential quality problem areas and to focus attention on work output improvement opportunities. The awareness of contractors on the importance of quality costs could be reflected in the extent of their quality costs planning. This paper presents an identification of planned quality costs in three construction projects executed by two large Indonesian contractors, a state-owned company and a private company in Jakarta. The objective is to enable the contractors to elaborate their quality costs planning and thereby improve their work output based on the findi ngs. Quality costs are first grouped into three categories: prevention, appraisal, and failure costs. Based on the works of previous researchers, a list of quality management activities that should be covered in each quality costs category is then created. The contractors’ planned quality costs data for each category are identified and collected through interviews and questionnaire surveys that refer to the list. Quality costs are expressed as a percentage of contract value. It is revealed that although large contractors already have certain knowledge on quality costs in construction projects, these costs are not planned in a structured way through an analysis of systematic quality costs records. Through cost categorization it is also shown that higher prevention and appraisal costs lead to lower failure costs. It is then concluded that a lot of work is still to be done by the contractors to set up a quality costs recording system which can serve as a basis for their quality improvement planning.

  20. ANALYSIS OF QUALITY COSTS FOR STATISTICA QUALITY CONTROL PLANNING

    Directory of Open Access Journals (Sweden)

    N. Chiadamrong

    2017-12-01

    Full Text Available Quality has become one or the most important force leading to organizational success and company growth in national and international markets. The return-on-investment from strong and effective quality programs is providing excellent profitability results in firms with effective quality strategies. Due to the wide variation in quality results, the search for the genuine keys to success in quality has become a matter of deep concern to management of companies. This paper suggests a way to quantifying quality costs. As a result, the appropriate quality strategies can be adjusted and set to match with each company situation based on the categorization of the quality costs suggested. This outcome can, then, be used as a guideline for manufactures in setting their suitable quality program, which establishes the proper balance between the costs and customer services.

  1. PLANNING THE IMPLEMENTATION OF QUALITY THROUGH STRATEGY FORMULATION AND CORPORATE GOVERNANCE

    Directory of Open Access Journals (Sweden)

    Nikola Stefanović

    2007-09-01

    Full Text Available Planning the implementation of quality is a complex process that depends on many different internal and external factors. Planning the implementation is defined by the capabilities of management to visualize the market position of the company and to evaluate the company's strengths, weaknesses, opportunities, and threats. Serving to the company's purposes, planning the implementation of quality must be integrated into the company's strategic objectives and then transferred to other parts of the organization utilizing the corporate governance system. Planning the implementation, as a part of strategy formulation, should be reflected in: 1 company's vision and mission development, 2 goals setting, 3 strategy development aimed at achieving goals, 4 implementation and execution of the strategy, and 4 monitoring, evaluation, control, and readjustment of the strategy. Finally, planning must account for all possible implementation barriers.

  2. 77 FR 52277 - Approval of Air Quality Implementation Plans; California; South Coast Air Quality Management...

    Science.gov (United States)

    2012-08-29

    ... Quality Implementation Plans; California; South Coast Air Quality Management District; Prevention of... rule. SUMMARY: EPA is proposing approval of a permitting rule submitted for the South Coast Air Quality Management District (District) portion of the California State Implementation Plan (SIP). The State is...

  3. 77 FR 12524 - Approval and Promulgation of Air Quality Implementation Plans; Indiana; Lead Ambient Air Quality...

    Science.gov (United States)

    2012-03-01

    ... Promulgation of Air Quality Implementation Plans; Indiana; Lead Ambient Air Quality Standards AGENCY... Indiana State Implementation Plan (SIP) for lead (Pb) under the Clean Air Act (CAA). This submittal incorporates the National Ambient Air Quality Standards (NAAQS) for Pb promulgated by EPA in 2008. DATES...

  4. 75 FR 65594 - Approval and Promulgation of Air Quality Implementation Plans; Ohio; Ohio Ambient Air Quality...

    Science.gov (United States)

    2010-10-26

    ... Promulgation of Air Quality Implementation Plans; Ohio; Ohio Ambient Air Quality Standards AGENCY... the Ohio Administrative Code (OAC) relating to the consolidation of Ohio's Ambient Air Quality Standards (AAQS) into Ohio's State Implementation Plan (SIP) under the Clean Air Act. On April 8, 2009, and...

  5. Renewing focus on family planning service quality globally.

    Science.gov (United States)

    Hancock, Nancy L; Stuart, Gretchen S; Tang, Jennifer H; Chibwesha, Carla J; Stringer, Jeffrey S A; Chi, Benjamin H

    2016-01-01

    Reducing the global unmet need for contraception is currently a priority for many governments, multi-lateral initiatives, non-governmental organizations, and donors. Evidence strongly suggests that the provision of quality family planning services can increase uptake, prevalence, and continuation of contraception. While an accepted framework to define the components of family planning service quality exists, translating this framework into assessment tools that are accessible, easily utilized, and valid for service providers has remained a challenge. We propose new approaches to improve the standardization and accessibility of family planning service quality assessment tools to simplify family planning service quality evaluation. With easier approaches to program evaluation, quality improvements can be performed more swiftly to help increase uptake and continuation of contraception to improve the health of women and their families.

  6. Quality improvement initiatives: the missed opportunity for health plans.

    Science.gov (United States)

    Fernandez-Lopez, Sara; Lennert, Barbara

    2009-11-01

    The increase in healthcare cost without direct improvements in health outcomes, coupled with a desire to expand access to the large uninsured population, has underscored the importance of quality initiatives and organizations that provide more affordable healthcare by maximizing value. To determine the knowledge of managed care organizations about quality organizations and initiatives and to identify potential opportunities in which pharmaceutical companies could collaborate with health plans in the development and implementation of quality initiatives. We conducted a survey of 36 pharmacy directors and 15 medical directors of different plans during a Managed Care Network meeting in 2008. The represented plans cover almost 74 million lives in commercial, Medicare, and Medicaid programs, or a combination of them. The responses show limited knowledge among pharmacy and medical directors about current quality organizations and initiatives, except for quality organizations that provide health plan quality accreditation. The results also reveal an opportunity for pharmaceutical companies to collaborate with private health plans in the development of quality initiatives, especially those related to drug utilization, such as patient adherence and education and correct drug utilization. Our survey shows clearly that today's focus for managed care organizations is mostly limited to the organizations that provide health plan quality accreditation, with less focus on other organizations.

  7. 78 FR 54835 - Air Quality Implementation Plan; Alabama; Attainment Plan for the Troy Area 2008 Lead...

    Science.gov (United States)

    2013-09-06

    ... 4] Air Quality Implementation Plan; Alabama; Attainment Plan for the Troy Area 2008 Lead... Troy 2008 Lead nonattainment area (hereafter referred to as the ``Troy Area'' or ``Area''). The Troy... submittal regarding the attainment plan based on Alabama's attainment demonstration for the Troy Area. The...

  8. 77 FR 23193 - Revisions to the California State Implementation Plan, Yolo-Solano Air Quality Management District

    Science.gov (United States)

    2012-04-18

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2012-0180; FRL-9652-3] Revisions to the California State Implementation Plan, Yolo- Solano Air Quality Management District AGENCY... the Yolo-Solano Air Quality Management District portion of the California State Implementation Plan...

  9. Quality control of injection moulded micro mechanical parts

    DEFF Research Database (Denmark)

    Gasparin, Stefania; Tosello, Guido; Hansen, Hans Nørgaard

    2009-01-01

    Quality control of micro components is an increasing challenge. Smaller mechanical parts are characterized by smaller tolerance to be verified. This paper focuses on the dimensional verification of micro injection moulded components selected from an industrial application. These parts are measured...... using an Optical Coordinate Measuring Machine (OCMM), which guarantees fast surface scans suitable for in line quality control. The uncertainty assessment of the measurements is calculated following the substitution method. To investigate the influence parameters in optical coordinate metrology two...

  10. 222-S Laboratory Quality Assurance Plan. Revision 1

    International Nuclear Information System (INIS)

    Meznarich, H.K.

    1995-01-01

    This Quality Assurance Plan provides,quality assurance (QA) guidance, regulatory QA requirements (e.g., 10 CFR 830.120), and quality control (QC) specifications for analytical service. This document follows the U.S Department of Energy (DOE) issued Hanford Analytical Services Quality Assurance Plan (HASQAP). In addition, this document meets the objectives of the Quality Assurance Program provided in the WHC-CM-4-2, Section 2.1. Quality assurance elements required in the Guidelines and Specifications for Preparing Quality Assurance Program Plans (QAMS-004) and Interim Guidelines and Specifications for Preparing Quality Assurance Project Plans (QAMS-005) from the US Environmental Protection Agency (EPA) are covered throughout this document. A quality assurance index is provided in the Appendix A. This document also provides and/or identifies the procedural information that governs laboratory operations. The personnel of the 222-S Laboratory and the Standards Laboratory including managers, analysts, QA/QC staff, auditors, and support staff shall use this document as guidance and instructions for their operational and quality assurance activities. Other organizations that conduct activities described in this document for the 222-S Laboratory shall follow this QA/QC document

  11. Quality assurance program plan fuel supply shutdown project

    International Nuclear Information System (INIS)

    Metcalf, I.L.

    1998-01-01

    This Quality Assurance Program plan (QAPP) describes how the Fuel Supply Shutdown (FSS) project organization implements the quality assurance requirements of HNF-MP-599, Project Hanford Quality Assurance Program Description (QAPD) and the B and W Hanford Company Quality Assurance Program Plan (QAPP), FSP-MP-004. The QAPP applies to facility structures, systems, and components and to activities (e.g., design, procurement, testing, operations, maintenance, etc.) that could affect structures, systems, and components. This QAPP also provides a roadmap of applicable Project Hanford Policies and Procedures (PHPP) which may be utilized by the FSS project organization to implement the requirements of this QAPP

  12. Hanford Sampling Quality Management Plan (HSQMP)

    International Nuclear Information System (INIS)

    Hyatt, J.E.

    1995-06-01

    HSQMP establishes quality requirements in response to DOE Order 5700. 6C and to 10 Code of Federal Regulations 830.120. HSQMP is designed to meet the needs of Richland Operations Office for controlling the quality of services provided by sampling operations. It is issued through the Analytical Services Program of the Waste Programs Division. This document describes the Environmental Sampling and Analysis Program activities considered to represent the best management activities necessary to achieve a sampling program with adequate control

  13. Visions, Strategic Planning, and Quality--More than Hype.

    Science.gov (United States)

    Kaufman, Roger

    1996-01-01

    Discusses the need to shift from the old models for organizational development to the new methods of quality management and continuous improvement, visions and visioning, and strategic planning, despite inappropriate criticisms they receive. (AEF)

  14. Managing Air Quality - Multi-Pollutant Planning and Control

    Science.gov (United States)

    Describes how planning controls for multiple pollutants at the same time can save money and time and achieve significant benefits, and how control strategies can address both climate change and air quality.

  15. Explicit optimization of plan quality measures in intensity-modulated radiation therapy treatment planning.

    Science.gov (United States)

    Engberg, Lovisa; Forsgren, Anders; Eriksson, Kjell; Hårdemark, Björn

    2017-06-01

    To formulate convex planning objectives of treatment plan multicriteria optimization with explicit relationships to the dose-volume histogram (DVH) statistics used in plan quality evaluation. Conventional planning objectives are designed to minimize the violation of DVH statistics thresholds using penalty functions. Although successful in guiding the DVH curve towards these thresholds, conventional planning objectives offer limited control of the individual points on the DVH curve (doses-at-volume) used to evaluate plan quality. In this study, we abandon the usual penalty-function framework and propose planning objectives that more closely relate to DVH statistics. The proposed planning objectives are based on mean-tail-dose, resulting in convex optimization. We also demonstrate how to adapt a standard optimization method to the proposed formulation in order to obtain a substantial reduction in computational cost. We investigated the potential of the proposed planning objectives as tools for optimizing DVH statistics through juxtaposition with the conventional planning objectives on two patient cases. Sets of treatment plans with differently balanced planning objectives were generated using either the proposed or the conventional approach. Dominance in the sense of better distributed doses-at-volume was observed in plans optimized within the proposed framework. The initial computational study indicates that the DVH statistics are better optimized and more efficiently balanced using the proposed planning objectives than using the conventional approach. © 2017 American Association of Physicists in Medicine.

  16. Quality planning and executive force of program files in quality management

    International Nuclear Information System (INIS)

    Sun Danyu

    2008-01-01

    This paper discussed the quality planning in quality management. In the quality planning, the quality objectives, the quality liabilities and the procedures shall be developed, grading supervise shall be exercised, quality assurance program shall be established, and requirements on resource and documents shall be defined. At the same time, we shall also intensify and enhance the execute force of program documentation, supervise and inspect the implementation result, establish detailed check indicators, and bring up the requirement on how to improve the quality of products. (author)

  17. Near-facility environmental monitoring quality assurance project plan

    International Nuclear Information System (INIS)

    McKinney, S.M.

    1997-01-01

    This Quality Assurance Project Plan addresses the quality assurance requirements for the activities associated with the preoperational and near facility environmental monitoring performed by Waste Management Federal Services, Inc., Northwest Operations and supersedes WHC-EP-0538-2. This plan applies to all sampling and monitoring activities performed by waste management Federal Services, Inc., Northwest Operations in implementing facility environmental monitoring at the Hanford Site

  18. ITER safety studies: starting the quality plan code AINA

    International Nuclear Information System (INIS)

    Dies, J.; Rivas, J. C.; Bargallo, E.

    2010-01-01

    This contribution discusses the implementation of the Quality Plan AINA Code 2.0. The work has affected areas such as the life cycle model, the software reliability plan, the design of the equipment or software tools to use, and has finally produced a new code.

  19. Media and public relation. Part of emergency planning

    International Nuclear Information System (INIS)

    Jurkovic, I.A.; Debrecin, N.; Feretic, D.; Skanata, D.

    2000-01-01

    In the event of an emergency, media relation should be considered as one of the most important functions in emergency management. Individuals should be trained to be able to provide factual information to the media and the citizens during nuclear emergencies. Media can be also acquainted with the scope, ways and means of providing information related to nuclear emergencies during the predefined and regular media training or workshops, or as a part of regular training routine of involved organizations and institutions. This paper is through various approaches trying to present one of the possible ways that media and public relation can be treated during the emergencies and inside the developed emergency plans and procedures. It also represents an idea, based on the authors' experience, on a way in which things can be organized in the Croatian Technical Support Center when it comes to the media/public relation issue. (author)

  20. 78 FR 63934 - Approval of Air Quality Implementation Plans; California; El Dorado County Air Quality Management...

    Science.gov (United States)

    2013-10-25

    ...] Approval of Air Quality Implementation Plans; California; El Dorado County Air Quality Management District... California for the El Dorado County Air Quality Management District (EDAQMD) portion of the California SIP... 24, 1987 Federal Register, May 25, 1988, U.S. EPA, Air Quality Management Division, Office of Air...

  1. 78 FR 19990 - Approval and Promulgation of Air Quality Implementation Plans; Ohio; Ohio Ambient Air Quality...

    Science.gov (United States)

    2013-04-03

    ... Promulgation of Air Quality Implementation Plans; Ohio; Ohio Ambient Air Quality Standards; Correction AGENCY... approved revisions to Ohio regulations that consolidated air quality standards in a new chapter of rules... State's air quality standards into Ohio Administrative Code (OAC) 3745-25 and modifying an assortment of...

  2. 75 FR 65572 - Approval and Promulgation of Air Quality Implementation Plans; Ohio; Ohio Ambient Air Quality...

    Science.gov (United States)

    2010-10-26

    ... Promulgation of Air Quality Implementation Plans; Ohio; Ohio Ambient Air Quality Standards AGENCY... Ohio Administrative Code (OAC) relating to the consolidation of Ohio's Ambient Air Quality Standards... apply to Ohio's SIP. Incorporating the air quality standards into Ohio's SIP helps assure that...

  3. 77 FR 12482 - Approval and Promulgation of Air Quality Implementation Plans; Indiana; Lead Ambient Air Quality...

    Science.gov (United States)

    2012-03-01

    ... Promulgation of Air Quality Implementation Plans; Indiana; Lead Ambient Air Quality Standards AGENCY... incorporates the National Ambient Air Quality Standards (NAAQS) for Pb promulgated by EPA in 2008. DATES: This... FR 66964) and codified at 40 CFR 50.16, ``National primary and secondary ambient air quality...

  4. Planning urban settlements for quality of life

    DEFF Research Database (Denmark)

    Boje Groth, N.; Hansen, K.E.; Björnberg, U.

    Notatet er et indlæg på den Europæiske Økonomiske Kommissions (ECE) konference om by- og regionforskning, tema II: "Research on the Quality of Life in Urban Settlements, Warszawa, maj 1976. I notatet opstilles en begrebsramme for livskvalitetsbegrebet, og man diskuterer hvorledes livskvalitetsana......Notatet er et indlæg på den Europæiske Økonomiske Kommissions (ECE) konference om by- og regionforskning, tema II: "Research on the Quality of Life in Urban Settlements, Warszawa, maj 1976. I notatet opstilles en begrebsramme for livskvalitetsbegrebet, og man diskuterer hvorledes...

  5. Westinghouse Water Reactor Divisions quality assurance plan

    International Nuclear Information System (INIS)

    1977-09-01

    The Quality Assurance Program used by Westinghouse Water Reactor Divisions is described. The purpose of the program is to assure that the design, materials, and workmanship on Nuclear Steam Supply System (NSSS) equipment meet applicable safety requirements, fulfill the requirements of the contracts with the applicants, and satisfy the applicable codes, standards, and regulatory requirements. This program satisfies the NRC Quality Assurance Criteria, 10CFR50 Appendix B, to the extent that these criteria apply to safety related NSSS equipment. Also, it follows the regulatory position provided in NRC regulatory guides and the requirements of ANSI Standard N45.2.12 as identified in this Topical Report

  6. Quality Assurance/Quality Control Issues for Intraoperative Planning and Adaptive Repeat Planning of Image-Guided Prostate Implants

    International Nuclear Information System (INIS)

    Zaider, Marco; Cohen, Gilad; Meli, Jerome; Rosenfeld, Anatoly B.

    2008-01-01

    The quality assurance/quality control purpose is this. We design a treatment plan, and we wish to be as certain as reasonably possible that the treatment is delivered as planned. In the case of conventionally planned prostate brachytherapy, implementing to the letter the implantation plan is rarely attainable and therefore can require adaptive replanning (a quality control issue). The reasons for this state of affairs include changes in the prostate shape and volume during implantation and treatment delivery (e.g., edema resolution) and unavoidable inaccuracy in the placement of the seeds in the prostate. As a result, quality-control activities (e.g., the need to monitor-ideally, on the fly-the target and urethral and rectal dosage) must be also addressed

  7. Quality assurance plan, Westinghouse Water Reactor Divisions

    Energy Technology Data Exchange (ETDEWEB)

    1976-03-01

    The Quality Assurance Program used by Westinghouse Nuclear Energy Systems Water Reactor Divisions is described. The purpose of the program is to assure that the design, materials, and workmanship on Nuclear Steam Supply System (NSSS) equipment meet applicable safety requirements, fulfill the requirements of the contracts with the applicants, and satisfy the applicable codes, standards, and regulatory requirements.

  8. Spatial quality, location theory and spatial planning

    NARCIS (Netherlands)

    Assink, Mathijs; Groenendijk, Nico

    2009-01-01

    This paper deals with spatial quality as a possible factor in location choices made by companies. Actual location decisions as well as location theory have changed over time. In the industrial era primary “hard” cost factors were dominant, to be supplemented by agglomeration factors ever since the

  9. D7.1 Quality Plan

    DEFF Research Database (Denmark)

    Ryberg, Thomas; Lee, Deirdre; Maglavera, Stavroula

    2009-01-01

    This deliverable includes a detailed description of the quality assurance process for the EATrain2 project, the initial results of the risk assessment and self-evaluation processes as well as a description of the peer-review process for ensuring qualitative deliverables....

  10. The two (quality) faces of HCHP (Harvard Community Health Plan).

    Science.gov (United States)

    Burda, D

    1991-03-18

    When it comes to total quality management, Harvard Community Health Plan has two personalities. It's using the principles espoused by such TQM gurus as Joseph Juran to reduce costs and improve quality in its clinics and offices. But HCHP also is enhancing its image in the healthcare industry by teaching TQM principles to others for big bucks.

  11. Quality Assurance Program Plan for radionuclide airborne emissions monitoring

    International Nuclear Information System (INIS)

    Vance, L.M.

    1993-07-01

    This Quality Assurance Program Plan (QAPP) describes the quality assurance requirements and responsibilities for radioactive airborne emissions measurements activities from regulated stacks are controlled at the Hanford Site. Detailed monitoring requirements apply to stacks exceeding 1% of the standard of 10 mrem annual effective dose equivalent to the maximally exposed individual from operations of the Hanford Site

  12. Quality Assessment of Family Planning Services in Ife/Ijesa ...

    African Journals Online (AJOL)

    Context: Medical audit in healthcare has a goal to monitor and upgrade the standard of health care in a setting. Whether a client will accept, use effectively and continue to practice contraception depends on the quality of services rendered. Objective: To assess the quality of our family planning services as perceived by our ...

  13. Embedding soil quality in land-use planning

    NARCIS (Netherlands)

    Wezel AP van; Weijden AGG van der; Wijnen HJ van; Mulder Ch; Wijnen HJ van; MNP; LER; LDL

    2006-01-01

    Changes in land use in the Netherlands are anticipated on a large scale. Soil quality, however, hardly plays a role in spatial planning, which was reason enough to analyse the relationship between land use and soil quality on a national scale using ecological data. Despite major changes in land

  14. Quality Assurance Program Plan for radionuclide airborne emissions monitoring

    Energy Technology Data Exchange (ETDEWEB)

    Vance, L.M.

    1993-07-01

    This Quality Assurance Program Plan (QAPP) describes the quality assurance requirements and responsibilities for radioactive airborne emissions measurements activities from regulated stacks are controlled at the Hanford Site. Detailed monitoring requirements apply to stacks exceeding 1% of the standard of 10 mrem annual effective dose equivalent to the maximally exposed individual from operations of the Hanford Site.

  15. Parts Quality Management: Direct Part Marking of Data Matrix Symbol for Mission Assurance

    Science.gov (United States)

    Moss, Chantrice; Chakrabarti, Suman; Scott, David W.

    2013-01-01

    A United States Government Accountability Office (GAO) review of twelve NASA programs found widespread parts quality problems contributing to significant cost overruns, schedule delays, and reduced system reliability. Direct part marking with Data Matrix symbols could significantly improve the quality of inventory control and parts lifecycle management. This paper examines the feasibility of using direct part marking technologies for use in future NASA programs. A structural analysis is based on marked material type, operational environment (e.g., ground, suborbital, Low Earth Orbit), durability of marks, ease of operation, reliability, and affordability. A cost-benefits analysis considers marking technology (label printing, data plates, and direct part marking) and marking types (two-dimensional machine-readable, human-readable). Previous NASA parts marking efforts and historical cost data are accounted for, including inhouse vs. outsourced marking. Some marking methods are still under development. While this paper focuses on NASA programs, results may be applicable to a variety of industrial environments.

  16. 33 CFR Appendix D to Part 154 - Training Elements for Oil Spill Response Plans

    Science.gov (United States)

    2010-07-01

    ... Appendix D to Part 154—Training Elements for Oil Spill Response Plans 1. General 1.1The portion of the plan dealing with training is one of the key elements of a response plan. This concept is clearly expressed by... that the plans often do not provide sufficient information in the training section of the plan for...

  17. Legacy Management CERCLA Sites. Quality Assurance Project Plan

    Energy Technology Data Exchange (ETDEWEB)

    Riddle, Donna L.

    2007-05-03

    S.M. Stoller Corporation is the contractor for the Technical Assistance Contract (TAC) for the U.S. Department of Energy (DOE) Office of Legacy Management (LM) operations. Stoller employs a management system that applies to all programs, projects, and business management systems funded through DOE-LM task orders. The management system incorporates the philosophy, policies, and requirements of health and safety, environmental compliance, and quality assurance (QA) in all aspects of project planning and implementation. Health and safety requirements are documented in the Health and Safety Manual (STO 2), the Radiological Control Manual (STO 3), the Integrated Safety Management System Description (STO 10), and the Drilling Health and Safety Requirements (STO 14). Environmental compliance policy and requirements are documented in the Environmental Management Program Implementation Manual (STO 11). The QA Program is documented in the Quality Assurance Manual (STO 1). The QA Manual (STO 1) implements the specific requirements and philosophy of DOE Order 414.1C, Quality Assurance. This manual also includes the requirements of other standards that are regularly imposed by customers, regulators, or other DOE orders. Title 10 Code of Federal Regulations Part 830, “Quality Assurance Requirements,” ANSI/ASQC E4-2004, “Quality Systems for Environmental Data and Technology Programs – Requirements with Guidance for Use,” and ISO 14001-2004, “Environmental Management Systems,” have been included. These standards are similar in content. The intent of the QA Manual (STO 1) is to provide a QA management system that incorporates the requirements and philosophy of DOE and other customers within the QA Manual. Criterion 1, “Quality Assurance Program,” identifies the fundamental requirements for establishing and implementing the QA management system; QA Instruction (QAI) 1.1, “QA Program Implementation,” identifies the TAC organizations that have responsibility for

  18. Site Maintenance Plan: Part 2, Site Maintenance Action Plan for FY 1994

    Energy Technology Data Exchange (ETDEWEB)

    Fisk, E.L.

    1994-06-01

    This Fiscal Year (FY) 1994 Site Maintenance Action Plan (SMAP) is Part II of the Site Maintenance Plan, and has been written by Westinghouse Hanford Company (WHC) to outline the requirements stated in DOE Order 4330.4B, Maintenance Management Program, Chapter 1, Paragraph 3.3.1. The SMAP provides an annual status of maintenance initiatives completed and planned, a summary of performance indicators, a summary of maintenance backlog, a listing of real property and capital equipment maintenance cost estimates that were used to create the FY 1996 infrastructure and maintenance budget input, and a listing of proposed line item and general plant projects. Additionally, assumptions for various Site programs are listed to bring the Site Maintenance Plan into focus with overall Site activities. The primary mission at Hanford is to clean up the Site. In this cleanup process WHC will provide scientific and technological expertise to meet global needs, and partnership with stakeholders in the region to develop regional economic diversification. Other missions at the Hanford Site include energy research and development, and waste management and disposal activities. Their primary mission has a 30-year projected life span and will direct the shutting down and cleanup of defense production facilities and the Fast Flux Test Facility. This long-term mission requires continuous maintenance and in many instances, replacement of existing basic infrastructure, support facilities, and utilities. Without adequate maintenance and capital funding these infrastructure, support facilities, and utilities will continue to deteriorate causing an increase in backlogged work.

  19. Site Maintenance Plan: Part 2, Site Maintenance Action Plan for FY 1994

    International Nuclear Information System (INIS)

    Fisk, E.L.

    1994-06-01

    This Fiscal Year (FY) 1994 Site Maintenance Action Plan (SMAP) is Part II of the Site Maintenance Plan, and has been written by Westinghouse Hanford Company (WHC) to outline the requirements stated in DOE Order 4330.4B, Maintenance Management Program, Chapter 1, Paragraph 3.3.1. The SMAP provides an annual status of maintenance initiatives completed and planned, a summary of performance indicators, a summary of maintenance backlog, a listing of real property and capital equipment maintenance cost estimates that were used to create the FY 1996 infrastructure and maintenance budget input, and a listing of proposed line item and general plant projects. Additionally, assumptions for various Site programs are listed to bring the Site Maintenance Plan into focus with overall Site activities. The primary mission at Hanford is to clean up the Site. In this cleanup process WHC will provide scientific and technological expertise to meet global needs, and partnership with stakeholders in the region to develop regional economic diversification. Other missions at the Hanford Site include energy research and development, and waste management and disposal activities. Their primary mission has a 30-year projected life span and will direct the shutting down and cleanup of defense production facilities and the Fast Flux Test Facility. This long-term mission requires continuous maintenance and in many instances, replacement of existing basic infrastructure, support facilities, and utilities. Without adequate maintenance and capital funding these infrastructure, support facilities, and utilities will continue to deteriorate causing an increase in backlogged work

  20. 78 FR 47241 - Amendments to the Water Quality Regulations, Water Code and Comprehensive Plan To Revise the...

    Science.gov (United States)

    2013-08-05

    ... DELAWARE RIVER BASIN COMMISSION 18 CFR Part 410 Amendments to the Water Quality Regulations, Water Code and Comprehensive Plan To Revise the Human Health Water Quality Criteria for PCBs in Zones 2... hold a public hearing to receive comments on proposed amendments to the Commission's Water Quality...

  1. 76 FR 16285 - Amendments to the Water Quality Regulations, Water Code and Comprehensive Plan To Update Water...

    Science.gov (United States)

    2011-03-23

    ... DELAWARE RIVER BASIN COMMISSION 18 CFR Part 410 Amendments to the Water Quality Regulations, Water Code and Comprehensive Plan To Update Water Quality Criteria for Toxic Pollutants in the Delaware... or ``Commission'') approved amendments to its Water Quality Regulations, Water Code and Comprehensive...

  2. 75 FR 41106 - Amendments to the Water Quality Regulations, Water Code and Comprehensive Plan to Update Water...

    Science.gov (United States)

    2010-07-15

    ... DELAWARE RIVER BASIN COMMISSION 18 CFR Part 410 Amendments to the Water Quality Regulations, Water Code and Comprehensive Plan to Update Water Quality Criteria for Toxic Pollutants in the Delaware... hold a public hearing to receive comments on proposed amendments to the Commission's Water Quality...

  3. Improve strategic supplier performance using DMAIC to develop a Quality Improvement Plan

    Science.gov (United States)

    Jardim, Kevin P.

    Supplier performance that meets the requirements of the customer has long plagued quality professionals. Despite the vast efforts by organizations to improve supplier performance, little has been done to standardize the plan to improve performance. This project presents a guideline and problem-solving strategy using a Define, Measure, Analyze, Improve, and Control (DMAIC) structured tool that will assist in the management and improvement of supplier performance. An analysis of benchmarked Quality Improvement Plans indicated that this topic needs more focus on how to accomplish improved supplier performance. This project is part of a growing body of supplier continuous improvement efforts. With the input of Zodiac Aerospace quality professionals this project's results provide a solution to Quality Improvement Plans and show objective evidence of its benefits. This project contributes to the future research on similar topics.

  4. 76 FR 40246 - Approval and Promulgation of Air Quality Implementation Plans; Ohio; Control of Gasoline...

    Science.gov (United States)

    2011-07-08

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R05-OAR-2006-0976; FRL-9430-5] Approval and Promulgation of Air Quality Implementation Plans; Ohio; Control of Gasoline Volatility; Correction AGENCY... a gasoline Reid Vapor Pressure (RVP) limit of 7.8 pounds per square inch (psi) for gasoline sold in...

  5. 77 FR 53773 - Revisions to the California State Implementation Plan, South Coast Air Quality Management...

    Science.gov (United States)

    2012-09-04

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2012-0236; FRL-9711-2] Revisions to the California State Implementation Plan, South Coast Air Quality Management District (SCAQMD) AGENCY... ``significant regulatory action'' subject to review by the Office of Management and Budget under Executive Order...

  6. 75 FR 32858 - Approval and Promulgation of Air Quality Implementation Plans; Delaware; Control of Nitrogen...

    Science.gov (United States)

    2010-06-10

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R03-OAR-2010-0039; FRL-9158-3] Approval and Promulgation of Air Quality Implementation Plans; Delaware; Control of Nitrogen Oxide Emissions From Industrial Boilers and Process Heaters at Petroleum Refineries Correction In rule document 2010-13377 beginning on...

  7. 77 FR 65627 - Approval and Promulgation of Air Quality Implementation Plans; Virginia; Deferral for CO2

    Science.gov (United States)

    2012-10-30

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R03-OAR-2012-0169; FRL-9745-5] Approval and Promulgation of Air Quality Implementation Plans; Virginia; Deferral for CO2 Emissions From Bioenergy and other Biogenic Sources Under the Prevention of Significant Deterioration Program AGENCY: Environmental Protection...

  8. 77 FR 22550 - Approval and Promulgation of Air Quality Implementation Plans; Illinois; Small Container...

    Science.gov (United States)

    2012-04-16

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R05-OAR-2012-0073; FRL-9651-6] Approval and Promulgation of Air Quality Implementation Plans; Illinois; Small Container Exemption From VOC Coating Rules... Administrative Code by adding [[Page 22551

  9. 77 FR 31727 - Approval and Promulgation of Air Quality Implementation Plans; Illinois; Small Container...

    Science.gov (United States)

    2012-05-30

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R05-OAR-2012-0073; FRL 9677-3] Approval and Promulgation of Air Quality Implementation Plans; Illinois; Small Container Exemption From VOC Coating Rules...), direct final rule approving a revision to the Illinois SIP that added a ``small container exemption'' for...

  10. 78 FR 26301 - Approval and Promulgation of Air Quality Implementation Plans; Illinois; Consumer Products and...

    Science.gov (United States)

    2013-05-06

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R05-OAR-2010-0394; EPA-R05-OAR-2012-0786; FRL-9786-1] Approval and Promulgation of Air Quality Implementation Plans; Illinois; Consumer Products and... consumer products categories into the State's SIP. Finally, EPA is proposing to approve language to clarify...

  11. Parts Quality Management: Direct Part Marking via Data Matrix Symbols for Mission Assurance

    Science.gov (United States)

    Moss, Chantrice

    2013-01-01

    A United States Government Accountability Office (GAO) review of twelve NASA programs found widespread parts quality problems contributing to significant cost overruns, schedule delays, and reduced system reliability. Direct part-marking with Data Matrix symbols could significantly improve the quality of inventory control and parts lifecycle management. This paper examines the feasibility of using 15 marking technologies for use in future NASA programs. A structural analysis is based on marked material type, operational environment (e.g., ground, suborbital, orbital), durability of marks, ease of operation, reliability, and affordability. A cost-benefits analysis considers marking technology (data plates, label printing, direct part marking) and marking types (two-dimensional machine-readable, human-readable). Previous NASA parts marking efforts and historical cost data are accounted for, including in-house vs. outsourced marking. Some marking methods are still under development. While this paper focuses on NASA programs, results may be applicable to a variety of industrial environments.

  12. A Planning Guide for Instructional Networks, Part I.

    Science.gov (United States)

    Daly, Kevin F.

    1994-01-01

    Discusses three phases in implementing a master plan for a school-based local area network (LAN): (1) network software selection; (2) hardware selection, network topology, and site preparation; and (3) implementation time table. Sample planning and specification worksheets and a list of planning guides are included. (Contains six references.) (KRN)

  13. 242-A Evaporator quality assurance plan. Revision 2

    International Nuclear Information System (INIS)

    Basra, T.S.

    1995-01-01

    The purpose of this quality assurance project plan (Plan) is to provide requirements for activities pertaining to sampling, shipping, and analyses associated with candidate feed tank samples for the 242-A Evaporator project. The purpose of the 242-A Evaporator project is to reduce the volume of aqueous waste in the Double Shell Tank (DST) System and will result in considerable savings to the disposal of mixed waste. The 242-A Evaporator feed stream originates from DSTs identified as candidate feed tanks. The 242-A Evaporator reduces the volume of aqueous waste contained in DSTs by boiling off water and sending the condensate (called process condensate) to the Liquid Effluent Retention Facility (LEPF) storage basin where it is stored prior to treatment in the Effluent Treatment Facility (ETF). The objective of this quality assurance project plan is to provide the planning, implementation, and assessment of sample collection and analysis, data issuance, and validation activities for the candidate feed tanks

  14. Quality assurance in a cask fleet parts control system

    International Nuclear Information System (INIS)

    Fernandez, C.; Shappert, L.B.

    1992-01-01

    This paper discusses applicable portions of the eighteen Quality Assurance criteria of Subpart H, 10 CFR 71 which are incorporated into a relational data base system which has been designed to manage the spare parts control system for a fleet of spent nuclear fuel casks. The system includes not only parts in warehouse storage but parts in use in the field plus casks, ancillary equipment, test equipment, support devices, and even personnel. It provides a high degree of assurance that any device for which a condition for certification has expired will be flagged for recertification testing or removal from service well before the critical date

  15. Quality assurance in a cask fleet parts control system

    International Nuclear Information System (INIS)

    Fernandez, C.; McCreery, P.N.; Shappert, L.B.

    1991-01-01

    Applicable portions of the eighteen Quality Assurance criteria of Subpart H, 10 CFR 71 are incorporated into a relational data base system which has been designed to manage the spare parts control system for a fleet of spent nuclear fuel casks. The system includes not only parts in warehouse storage but parts in use in the field plus casks, ancillary equipment, test equipment, support devices, and even personnel. It provides a high degree of assurance that any device for which a condition for certification has expired will be flagged for recertification testing or removal from service well before the critical date

  16. The Columbia River Protection Supplemental Technologies Quality Assurance Project Plan

    International Nuclear Information System (INIS)

    Fix, Anne

    2007-01-01

    The U.S. Department of Energy (DOE) has conducted interim groundwater remedial activities on the Hanford Site since the mid-1990s for several groundwater contamination plumes. DOE established the Columbia River Protection Supplemental Technologies Project (Technologies Project) in 2006 to evaluate alternative treatment technologies. The objectives for the technology project are as follows: develop a 300 Area polyphosphate treatability test to immobilize uranium, design and test infiltration of a phosphate/apatite technology for Sr-90 at 100-N, perform carbon tetrachloride and chloroform attenuation parameter studies, perform vadose zone chromium characterization and geochemistry studies, perform in situ biostimulation of chromium studies for a reducing barrier at 100-D, and perform a treatability test for phytoremediation for Sr-90 at 100-N. This document provides the quality assurance guidelines that will be followed by the Technologies Project. This Quality Assurance Project Plan is based on the quality assurance requirements of DOE Order 414.1C, Quality Assurance, and 10 CFR 830, Subpart A--Quality Assurance Requirements as delineated in Pacific Northwest National Laboratory?s Standards-Based Management System. In addition, the technology project is subject to the Environmental Protection Agency (EPA) Requirements for Quality Assurance Project Plans (EPA/240/B-01/003, QA/R-5). The Hanford Analytical Services Quality Assurance Requirements Documents (HASQARD, DOE/RL-96-68) apply to portions of this project and to the subcontractors. HASQARD requirements are discussed within applicable sections of this plan.

  17. Implementation guide for Hanford Analytical Services Quality Assurance Plan

    International Nuclear Information System (INIS)

    1994-09-01

    This implementation guide for the Hanford Analytical Services Quality Assurance Plan (HASQAP) was developed by the US Department of Energy, Richland Operations Office (RL) Waste Management Division, Analytical Services Branch. This plan formally presents RL's direction for Hanford Sitewide implementation of the HASQAP. The HASQAP establishes a uniform standard for quality requirements to meet US Department of Energy Order 5700.6C, Quality Assurance (10 CFR 830.120, ''Quality Assurance Requirements''), and is intended to satisfy the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) requirements for ''Guidance on Preparation of Laboratory Quality Assurance Plans''. The quality assurance criteria specified in the HASQAP shall serve as a baseline for implementing quality management systems for the laboratories that provide analytical services, for data requesters and users, and for oversight organizations that monitor the data-generation process. Affected organizations shall implement the HASQAP requirements that are applicable to their work scope. Full implementation of the HASQAP is scheduled to occur by August 1995. RL will work with the US Environmental Protection Agency (EPA) and Washington State Department of Ecology (Ecology) to have the HASQAP document incorporated into Appendix F of the Tri-Party Agreement by early Fiscal Year 1996

  18. Integration of air quality-related planning processes : report

    International Nuclear Information System (INIS)

    2004-05-01

    Several communities in British Columbia have conducted air quality, greenhouse gas, or community energy management plans. This report explored the possibility of integrating 3 community-based air quality-related planning processes into a single process and evaluated the use of these 3 processes by local governments and First Nations in identifying and addressing air quality-related objectives, and determined to what extent they could be integrated to achieve planning objectives for air quality, greenhouse gas emissions, and energy supply and conservation. The lessons learned from 9 case studies in British Columbia were presented. The purpose of the case studies was to examine how communities handled emissions and energy related inventory and planning work, as well as their experiences with, or considerations for, an integrated process. The lessons were grouped under several key themes including organization and stakeholder involvement; messaging and focus; leadership/champions; and resources and capacity. The report also outlined a framework for an integrated planning process and provided recommendations regarding how an integrated or complementary process could be performed. A number of next steps were also offered for the provincial government to move the concept of an integrated process forward with the assistance of other partners. These included identifying the resources required to support communities engaging in an integrated process as well as discussing the series of options for provincial support with key stakeholders. refs., tabs., figs

  19. Plutonium stabilization and handling quality assurance program plan

    International Nuclear Information System (INIS)

    Weiss, E.V.

    1998-01-01

    This Quality Assurance Program Plan (QAPP) identifies project quality assurance requirements for all contractors involved in the planning and execution of Hanford Site activities for design, procurement, construction, testing and inspection for Project W-460, Plutonium Stabilization and Handling. The project encompasses procurement and installation of a Stabilization and Packaging System (SPS) to oxidize and package for long term storage remaining plutonium-bearing special nuclear materials currently in inventory at the Plutonium Finishing Plant (PFP), and modification of vault equipment to allow storage of resulting packages of stabilized SNM

  20. Gas generation matrix depletion quality assurance project plan

    International Nuclear Information System (INIS)

    1998-01-01

    The Los Alamos National Laboratory (LANL) is to provide the necessary expertise, experience, equipment and instrumentation, and management structure to: Conduct the matrix depletion experiments using simulated waste for quantifying matrix depletion effects; and Conduct experiments on 60 cylinders containing simulated TRU waste to determine the effects of matrix depletion on gas generation for transportation. All work for the Gas Generation Matrix Depletion (GGMD) experiment is performed according to the quality objectives established in the test plan and under this Quality Assurance Project Plan (QAPjP)

  1. ERD UMTRA Project quality assurance program plan, Revision 7

    International Nuclear Information System (INIS)

    1995-09-01

    This document is the revised Quality Assurance Program Plan (QAPP) dated September, 1995 for the Environmental Restoration Division (ERD) Uranium Mill Tailings Remedial Action Project (UMTRA). Quality Assurance requirements for the ERD UMTRA Project are based on the criteria outlined in DOE Order 5700.6C or applicable sections of 10 CFR 830.120. QA requirements contained in this QAPP shall apply to all personnel, processes, and activities, including planning, scheduling, and cost control, performed by the ERD UMTRA Project and its contractors

  2. Project Hanford management contract quality improvement project management plan; TOPICAL

    International Nuclear Information System (INIS)

    ADAMS, D.E.

    1999-01-01

    On July 13, 1998, the U.S. Department of Energy, Richland Operations Office (DOE-RL) Manager transmitted a letter to Fluor Daniel Hanford, Inc. (FDH) describing several DOE-RL identified failed opportunities for FDH to improve the Quality Assurance (QA) Program and its implementation. In addition, DOE-RL identified specific Quality Program performance deficiencies. FDH was requested to establish a periodic reporting mechanism for the corrective action program. In a July 17, 1998 response to DOE-RL, FDH agreed with the DOE concerns and committed to perform a comprehensive review of the Project Hanford Management Contract (PHMC) QA Program during July and August, 1998. As a result, the Project Hanford Management Contract Quality Improvement Plan (QIP) (FDH-3508) was issued on October 21, 1998. The plan identified corrective actions based upon the results of an in-depth Quality Program Assessment. Immediately following the scheduled October 22, 1998, DOE Office of Enforcement and Investigation (EH-10) Enforcement Conference, FDH initiated efforts to effectively implement the QIP corrective actions. A Quality Improvement Project (QI Project) leadership team was assembled to prepare a Project Management Plan for this project. The management plan was specifically designed to engage a core team and the support of representatives from FDH and the major subcontractors (MSCs) to implement the QIP initiatives; identify, correct, and provide feedback as to the root cause for deficiency; and close out the corrective actions. The QI Project will manage and communicate progress of the process

  3. SU-F-T-617: Remotely Pre-Planned Stereotactic Ablative Radiation Therapy: Validation of Treatment Plan Quality

    International Nuclear Information System (INIS)

    Juang, T; Bush, K; Loo, B; Gensheimer, M

    2016-01-01

    Purpose: We propose a workflow to improve access to stereotactic ablative radiation therapy (SABR) for rural patients. When implemented, a separate trip to the central facility for simulation can be eliminated. Two elements are required: (1) Fabrication of custom immobilization devices to match positioning on prior diagnostic CT (dxCT). (2) Remote radiation pre-planning on dxCT, with transfer of contours/plan to simulation CT (simCT) and initiation of treatment same-day or next day. In this retrospective study, we validated part 2 of the workflow using patients already treated with SABR for upper lobe lung tumors. Methods: Target/normal structures were contoured on dxCT; a plan was created and approved by the physician. Structures were transferred to simCT using deformable image registration and the plan was re-optimized on simCT. Plan quality was evaluated through comparison to gold-standard structures contoured on simCT and a gold-standard plan based on these structures. Workflow-generated plan quality in this study represents a worst-case scenario as these patients were not treated using custom immobilization to match dxCT position as would be done when the workflow is implemented clinically. Results: 5/6 plans created through the pre-planning workflow were clinically acceptable. For all six plans, the gold-standard GTV received full prescription dose, along with median PTV V95%=95.2% and median PTV D95%=95.4%. Median GTV DSC=0.80, indicating high degree of similarity between the deformed and gold-standard GTV contours despite small GTV sizes (mean=3.0cc). One outlier (DSC=0.49) resulted in inadequate PTV coverage (V95%=62.9%) in the workflow plan; in clinical practice, this mismatch between deformed/gold-standard GTV would be revised by the physician after deformable registration. For all patients, normal tissue doses were comparable to the gold-standard plan and well within constraints. Conclusion: Pre-planning SABR cases on diagnostic imaging generated

  4. Quality plan for criticality safety calculations at Rocky Flats

    International Nuclear Information System (INIS)

    Pecora, D.

    1978-01-01

    The text of the plan is given, and some of the guidelines followed in writing it are discussed to aid others who may be faced with the same task. The plan is divided into four sections. The Introduction describes the general functions and purpose of the calculational program. The second section, Activities and Responsibilities, lists specific tasks and their purposes and assigns responsibility for performance. The third section references relevant documentation (e.g., ANSI standards), and the final section describes quality plans for specific functions

  5. Market and plan characteristics related to HMO quality and improvement.

    Science.gov (United States)

    Scanlon, Dennis P; Swaminathan, Shailender; Chernew, Michael; Lee, Woolton

    2006-12-01

    Existing research on health plan performance examines whether variation in plans' scores is related to enrollee and health plan traits, primarily using cross-sectional research designs. This study extends that literature by incorporating data on market characteristics using a longitudinal framework. We estimate multivariate growth models that relate plan performance on standard measures to market and HMO characteristics using an unbalanced panel of data for 1998 to 2002. We find that HMO competition is not associated with better performance or greater rates of improvement in performance on the HEDIS chronic care measures. HMO penetration, on the other hand, is positively associated with HEDIS performance in several of the chronic care process-and-outcomes measures but not with a greater rate of improvement through time. Our analysis indicates that a significant percentage of the unexplained variation in quality improvement is because of permanent, unobserved plan-level characteristics that future research should strive to identify.

  6. AVLIS Production Plant Preliminary Quality Assurance Plan and Assessment

    International Nuclear Information System (INIS)

    1984-01-01

    This preliminary Quality Assurance Plan and Assessment establishes the Quality Assurance requirements for the AVLIS Production Plant Project. The Quality Assurance Plan defines the management approach, organization, interfaces, and controls that will be used in order to provide adequate confidence that the AVLIS Production Plant design, procurement, construction, fabrication, installation, start-up, and operation are accomplished within established goals and objectives. The Quality Assurance Program defined in this document includes a system for assessing those elements of the project whose failure would have a significant impact on safety, environment, schedule, cost, or overall plant objectives. As elements of the project are assessed, classifications are provided to establish and assure that special actions are defined which will eliminate or reduce the probability of occurrence or control the consequences of failure. 8 figures, 18 tables

  7. The Columbia River Protection Supplemental Technologies Quality Assurance Project Plan

    Energy Technology Data Exchange (ETDEWEB)

    Fix, N. J.

    2008-03-12

    Pacific Northwest National Laboratory researchers are working on the Columbia River Protection Supplemental Technologies Project. This project is a U. S. Department of Energy, Office of Environmental Management-funded initiative designed to develop new methods, strategies, and technologies for characterizing, modeling, remediating, and monitoring soils and groundwater contaminated with metals, radionuclides, and chlorinated organics. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the Technologies Project staff.

  8. Disaster Recovery Planning as part of Business Continuity Management

    OpenAIRE

    Pinta, Jan

    2011-01-01

    Nowadays, a well functioning ICT infrastructure belongs to the most critical factors of companies across all branches of business. An importance of ensuring the continued operation of information systems, or the rapid recovery of the systems in the case of emergency, has increased. These needs require creating business continuity management plan and disaster recovery planning. This paper describes the creation of emergency and recovery plans and setting recovery objectives significantly affec...

  9. Federal Facilities Compliance Act, Conceptual Site Treatment Plan. Part 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1993-10-29

    This Conceptual Site Treatment Plan was prepared by Ames Laboratory to meet the requirements of the Federal Facilities Compliance Act. Topics discussed in this document include: general discussion of the plan, including the purpose and scope; technical aspects of preparing plans, including the rationale behind the treatability groupings and a discussion of characterization issues; treatment technology needs and treatment options for specific waste streams; low-level mixed waste options; TRU waste options; and future waste generation from restoration activities.

  10. 33 CFR Appendix C to Part 155 - Training Elements for Oil Spill Response Plans

    Science.gov (United States)

    2010-07-01

    .... 155, App. C Appendix C to Part 155—Training Elements for Oil Spill Response Plans 1. General 1.1The portion of the plan dealing with training is one of the key elements of a response plan. This concept is... included training as one of the sections required in a vessel or facility response plan. In reviewing...

  11. 42 CFR 423.128 - Dissemination of Part D plan information.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 3 2010-10-01 2010-10-01 false Dissemination of Part D plan information. 423.128... Protections § 423.128 Dissemination of Part D plan information. (a) Detailed description. A Part D sponsor must disclose the information specified in paragraph (b) of this section in the manner specified by CMS...

  12. Quality of life after percutaneous coronary intervention: part 1.

    Science.gov (United States)

    Cassar, Stephen; R Baldacchino, Donia

    Quality of life (QOL) is a complex concept comprised of biopsychosocial, spiritual and environmental dimensions. However, the majority of research addresses only its physical function perspectives. This two-part series examines the holistic perspective of QOL of patients after percutaneous coronary intervention (PCI). Part 1 explains the research process of a cross-sectional descriptive study and its limitations. Data were collected by a mailed WHOQOL-BREF questionnaire in Maltese from a systematic sample of patients who had undergone PCI; the response rate was 64% (n=228; males n=169, females n=59, age 40-89 years). Part 1 also considers limitations, such as its cross-sectional design and retrospective data collection. The hierarchy of human needs theory (Maslow, 1999) guided the study. Part 2 gives the findings on the holistic view of QOL. Having social and family support, as a characteristic of Maltese culture appeared to contribute towards a better QOL.

  13. Impact of Dynamics of Planned Change on Employees Quality of ...

    African Journals Online (AJOL)

    In this study, we determined the impact of organizational planned change programmes on the quality of worklife (QWL) of employees. The study involved four organizations selected from both the private and public sector establishments in Port Harcourt. Two organizations were randomly selected from each sector.

  14. Sequence Coding and Search System Backfit Quality Assurance Program Plan

    International Nuclear Information System (INIS)

    Lovell, C.J.; Stepina, P.L.

    1985-03-01

    The Sequence Coding and Search System is a computer-based encoding system for events described in Licensee Event Reports. This data system contains LERs from 1981 to present. Backfit of the data system to include LERs prior to 1981 is required. This report documents the Quality Assurance Program Plan that EG and G Idaho, Inc. will follow while encoding 1980 LERs

  15. Quality Assurance Plans under the Renewable Fuel Standard Program

    Science.gov (United States)

    Quality Assurance Plan or (QAP) is a voluntary program where independent third-parties may audit and verify that RINs have been properly generated and are valid for compliance purposes. RINs verified under a QAP may be purchased by regulated parties.

  16. POSTER FOR NRMRL QUALITY MANAGEMENT PLAN (QMP) TRAINING COURSE

    Science.gov (United States)

    NRMRL QMP Training CourseContact: Lauren Drees, NRMRL/STD (drees.lauren@epa.gov) NRMRL has developed a computer-based course to train personnel in the requirements of the NRMRL Quality Management Plan (QMP). This training course was developed using Trainersoft s...

  17. Assessment report for Hanford analytical services quality assurance plan

    International Nuclear Information System (INIS)

    Taylor, L.H.

    1994-11-01

    This report documents the assessment results of DOE/RL-94-55, Hanford Analytical Services Quality Assurance Plan. The assessment was conducted using the Requirement and Self-Assessment Database (RSAD), which contains mandatory and nonmandatory DOE Order statements for the relevant DOE orders

  18. Quantity and quality of written feedback, action plans, and student ...

    African Journals Online (AJOL)

    Background. Mini-clinical-evaluation exercise (mini-CEX) assessment forms that have been modified with the addition of specific spaces on separate sheets are expected to improve the quantity and quality of written feedback and the action plan for further learning which is agreed upon, and to encourage written reflection.

  19. 77 FR 23652 - Approval and Promulgation of Air Quality Implementation Plans; Illinois; Leisure Properties LLC/D...

    Science.gov (United States)

    2012-04-20

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R05-OAR-2011-0944; FRL-9648-7] Approval and Promulgation of Air Quality Implementation Plans; Illinois; Leisure Properties LLC/D/B/A Crownline Boats... proposing to approve into the Illinois State Implementation Plan (SIP) an adjusted standard for Leisure...

  20. 78 FR 46552 - Approval and Promulgation of Air Quality Implementation Plans; State of Colorado; Second Ten-Year...

    Science.gov (United States)

    2013-08-01

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R08-OAR-2011-0659; FRL-9840-6] Approval and Promulgation of Air Quality Implementation Plans; State of Colorado; Second Ten-Year Carbon Monoxide Maintenance Plan for Colorado Springs AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule...

  1. 78 FR 46861 - Approval and Promulgation of Air Quality Implementation Plans; State of Colorado; Second Ten-Year...

    Science.gov (United States)

    2013-08-02

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R08-OAR-2011-0658; FRL-9840-8] Approval and Promulgation of Air Quality Implementation Plans; State of Colorado; Second Ten-Year Carbon Monoxide Maintenance Plan for Greeley AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY...

  2. 78 FR 57573 - Approval and Promulgation of Air Quality Implementation Plans; State of Colorado Second Ten-Year...

    Science.gov (United States)

    2013-09-19

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R08-OAR-2012-0475; FRL-9901-05-Region 8] Approval and Promulgation of Air Quality Implementation Plans; State of Colorado Second Ten-Year PM 10 Maintenance Plan for Aspen AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA...

  3. 78 FR 41342 - Approval and Promulgation of Air Quality Implementation Plans; State of Colorado Second Ten-Year...

    Science.gov (United States)

    2013-07-10

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R08-OAR-2010-0389; FRL-9831-9] Approval and Promulgation of Air Quality Implementation Plans; State of Colorado Second Ten-Year PM 10 Maintenance Plan for Ca[ntilde]on City AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA...

  4. 78 FR 41307 - Approval and Promulgation of Air Quality Implementation Plans; State of Colorado; Second Ten-Year...

    Science.gov (United States)

    2013-07-10

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R08-OAR-2010-0389; FRL-9832-1] Approval and Promulgation of Air Quality Implementation Plans; State of Colorado; Second Ten-Year PM 10 Maintenance Plan for Ca[ntilde]on City AGENCY: Environmental Protection Agency (EPA). ACTION: Direct final rule. SUMMARY...

  5. 78 FR 56185 - Approval and Promulgation of Air Quality Implementation Plans; State of Colorado; Second Ten-Year...

    Science.gov (United States)

    2013-09-12

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R08-OAR-2011-0708; FRL-9900-87-Region 8] Approval and Promulgation of Air Quality Implementation Plans; State of Colorado; Second Ten-Year Carbon Monoxide Maintenance Plan for Fort Collins AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed...

  6. Quality Assurance Plan, N springs expedited response action

    International Nuclear Information System (INIS)

    Jackson, G.J.

    1994-01-01

    This document is the Quality Assurance Plan (QAP) to be followed during the definitive design, construction, and operational phases for activities associated with the N Springs Expedited Response Action (ERA) for the 100-NR-2 Operable Unit (OU). Westinghouse Hanford Company (WHC) will comply with the US Department of Energy (DOE) Order 5700.6C, Quality Assurance (DOE 1989), and the US Environmental Protection Agency (EPA), EPA/530-SW-86-031, Technical Guidance Document: Construction Quality Assurance for Hazardous Waste Land Disposal Facilities (EPA 1986)

  7. Review of quality assessment tools for family planning programmes in low- and middle-income countries.

    Science.gov (United States)

    Sprockett, Andrea

    2017-03-01

    Measuring and tracking the quality of healthcare is a critical part of improving service delivery, clinic efficiency and health outcomes. However, no standardized or widely accepted tool exists to assess the quality of clinic-based family planning services in low- and middle-income countries. The objective of this literature review was to identify widely used public domain quality assessment tools with existing or potential application in clinic-based family planning programmes. Using PubMed, PopLine, Google Scholar and Google, key terms such as ‘quality assessment tool’, ‘quality assessment method’, ‘quality measurement’, ‘LMIC’, ‘developing country’, ‘family planning’ and ‘reproductive health’ were searched for articles, identifying 20 relevant tools. Tools were assessed to determine the type of quality components assessed, divided into structure and process components, level of application (national or facility), health service domain that can be assessed by the tool, cost and current use of the tool. Tools were also assessed for shortcomings based on application in a low- and middle-income clinic-based family planning programme, including personnel required, re-assessment frequency, assessment of structure, process and outcome quality, comparability of data over time and across facilities and ability to benchmark clinic results to a national benchmark. No tools met all criteria, indicating a critical gap in quality assessment for low- and middle-income family planning programmes. To achieve Universal Health Coverage, agreed on in the Sustainable Development Goals and to improve system-wide healthcare quality, we must develop and widely adopt a standardized quality assessment tool.

  8. Image registration: An essential part of radiation therapy treatment planning

    International Nuclear Information System (INIS)

    Rosenman, Julian G.; Miller, Elizabeth P.; Tracton, Gregg; Cullip, Tim J.

    1998-01-01

    Purpose: We believe that a three-dimensional (3D) registration of nonplanning (diagnostic) imaging data with the planning computed tomography (CT) offers a substantial improvement in tumor target identification for many radiation therapy patients. The purpose of this article is to review and discuss our experience to date. Methods and Materials: We reviewed the charts and treatment planning records of all patients that underwent 3D radiation treatment planning in our department from June 1994 to December 1995, to learn which patients had image registration performed and why it was thought they would benefit from this approach. We also measured how much error would have been introduced into the target definition if the nonplanning imaging data had not been available and only the planning CT had been used. Results: Between June 1994 and December 1995, 106 of 246 (43%) of patients undergoing 3D treatment planning had image registration. Four reasons for performing registration were identified. First, some tumor volumes have better definition on magnetic resonance imaging (MRI) than on CT. Second, a properly contrasted diagnostic CT sometimes can show the tumor target better than can the planning CT. Third, the diagnostic CT or MR may have been preoperative, with the postoperative planning CT no longer showing the tumor. Fourth, the patient may have undergone cytoreductive chemotherapy so that the postchemotherapy planning CT no longer showed the original tumor volume. In patients in whom the planning CT did not show the tumor volume well an analysis was done to determine how the treatment plan was changed with the addition of a better tumor-defining nonplanning CT or MR. We have found that the use of this additional imaging modality changed the tumor location in the treatment plan at least 1.5 cm for half of the patients, and up to 3.0 cm for ((1)/(4)) of the patients. Conclusions: Multimodality and/or sequential imaging can substantially aid in better tumor

  9. Nevada Nuclear Waste Storage Investigations: Quality Assurance Plan

    International Nuclear Information System (INIS)

    1980-08-01

    The Nevada Nuclear Waste Storage Investigations (NNWSI) were established by DOE/NV to evaluate the geohydrologic setting and underground rock masses of the Nevada Test Site (NTS) and contiguous areas to determine whether a suitable site exists for constructing a repository for isolating highly radioactive solid wastes. Since the results of these evaluations will impact possible risks to public health and safety, a quality assurance program which conforms to the criteria given in the Code of Federal Regulations is needed to control the quality aspects of the work. This Quality Assurance Plan (QAP) describes the general quality assurance program for the overall NNWSI project under which the quality assurance programs of the individual participating organizations and support contractors are to operate. The details of how each of these groups will meet the criteria will differ among participating organizations and support contractors, and those details are given in the QAPP's listed in Appendix A. It is the purpose of this plan to show the commonality of quality assurance programs in effect within the project and to define how each element fits into the entire picture to give total quality assurance coverage for the NNWSI Project

  10. Mixed Waste Integrated Program Quality Assurance requirements plan

    International Nuclear Information System (INIS)

    1994-01-01

    Mixed Waste Integrated Program (MWIP) is sponsored by the US Department of Energy (DOE), Office of Technology Development, Waste Management Division. The strategic objectives of MWIP are defined in the Mixed Waste Integrated Program Strategic Plan, and expanded upon in the MWIP Program Management Plan. This MWIP Quality Assurance Requirement Plan (QARP) applies to mixed waste treatment technologies involving both hazardous and radioactive constituents. As a DOE organization, MWIP is required to develop, implement, and maintain a written Quality Assurance Program in accordance with DOE Order 4700.1 Project Management System, DOE Order 5700.6C, Quality Assurance, DOE Order 5820.2A Radioactive Waste Management, ASME NQA-1 Quality Assurance Program Requirements for Nuclear Facilities and ANSI/ASQC E4-19xx Specifications and Guidelines for Quality Systems for Environmental Data Collection and Environmental Technology Programs. The purpose of the MWIP QA program is to establish controls which address the requirements in 5700.6C, with the intent to minimize risks and potential environmental impacts; and to maximize environmental protection, health, safety, reliability, and performance in all program activities. QA program controls are established to assure that each participating organization conducts its activities in a manner consistent with risks posed by those activities

  11. Metro Vancouver air quality management plan : progress report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2008-10-15

    The Greater Vancouver Regional District (GVRD) developed an air quality management plan (AQMP) in 2005 as a means of addressing air quality issues in the region. The plan required progress reports every 2 years as well as a comprehensive review every 5 years. The AQMP established goals to minimize risk to public health from air pollution, improve visibility, and minimize the region's contributions to global climatic change by reducing emissions; implementing local air quality management programs; and enhancing air quality information and public awareness. The AQMP also included a sustainability framework for GVRD's policies and regulations related to regional growth, service delivery and political leadership. Regional strategies for solid waste and liquid waste management were developed in 2008. The sustainability framework has developed 3 priority goals: (1) to reduce diesel particulates by 75 per cent from Metro Vancouver corporate sources by 2012, (2) to be carbon neutral by 2012 excluding solid waste operations, and (3) to reduce regional GHGs by 15 per cent by 2015, and 33 per cent by 2020. Progress updates on regional planning efforts for the AQMP were presented. The report also outlined trends and performance measures used by the GVRD, and discussed changes in air quality issues and priorities that have occurred since the AQMP was adopted in 2005. 1 tab., 8 figs.

  12. The Groundwater Performance Assessment Project Quality Assurance Plan

    International Nuclear Information System (INIS)

    Luttrell, Stuart P.

    2006-01-01

    U.S. Department of Energy (DOE) has monitored groundwater on the Hanford Site since the 1940s to help determine what chemical and radiological contaminants have made their way into the groundwater. As regulatory requirements for monitoring increased in the 1980s, there began to be some overlap between various programs. DOE established the Groundwater Performance Assessment Project (groundwater project) in 1996 to ensure protection of the public and the environment while improving the efficiency of monitoring activities. The groundwater project is designed to support all groundwater monitoring needs at the site, eliminate redundant sampling and analysis, and establish a cost-effective hierarchy for groundwater monitoring activities. This document provides the quality assurance guidelines that will be followed by the groundwater project. This QA Plan is based on the QA requirements of DOE Order 414.1C, Quality Assurance, and 10 CFR 830, Subpart A--General Provisions/Quality Assurance Requirements as delineated in Pacific Northwest National Laboratory's Standards-Based Management System. In addition, the groundwater project is subject to the Environmental Protection Agency (EPA) Requirements for Quality Assurance Project Plans (EPA/240/B-01/003, QA/R-5). The groundwater project has determined that the Hanford Analytical Services Quality Assurance Requirements Documents (HASQARD, DOE/RL-96-68) apply to portions of this project and to the subcontractors. HASQARD requirements are discussed within applicable sections of this plan

  13. Metro Vancouver air quality management plan : progress report

    International Nuclear Information System (INIS)

    2008-10-01

    The Greater Vancouver Regional District (GVRD) developed an air quality management plan (AQMP) in 2005 as a means of addressing air quality issues in the region. The plan required progress reports every 2 years as well as a comprehensive review every 5 years. The AQMP established goals to minimize risk to public health from air pollution, improve visibility, and minimize the region's contributions to global climatic change by reducing emissions; implementing local air quality management programs; and enhancing air quality information and public awareness. The AQMP also included a sustainability framework for GVRD's policies and regulations related to regional growth, service delivery and political leadership. Regional strategies for solid waste and liquid waste management were developed in 2008. The sustainability framework has developed 3 priority goals: (1) to reduce diesel particulates by 75 per cent from Metro Vancouver corporate sources by 2012, (2) to be carbon neutral by 2012 excluding solid waste operations, and (3) to reduce regional GHGs by 15 per cent by 2015, and 33 per cent by 2020. Progress updates on regional planning efforts for the AQMP were presented. The report also outlined trends and performance measures used by the GVRD, and discussed changes in air quality issues and priorities that have occurred since the AQMP was adopted in 2005. 1 tab., 8 figs

  14. Mixed Waste Integrated Program Quality Assurance requirements plan

    Energy Technology Data Exchange (ETDEWEB)

    1994-04-15

    Mixed Waste Integrated Program (MWIP) is sponsored by the US Department of Energy (DOE), Office of Technology Development, Waste Management Division. The strategic objectives of MWIP are defined in the Mixed Waste Integrated Program Strategic Plan, and expanded upon in the MWIP Program Management Plan. This MWIP Quality Assurance Requirement Plan (QARP) applies to mixed waste treatment technologies involving both hazardous and radioactive constituents. As a DOE organization, MWIP is required to develop, implement, and maintain a written Quality Assurance Program in accordance with DOE Order 4700.1 Project Management System, DOE Order 5700.6C, Quality Assurance, DOE Order 5820.2A Radioactive Waste Management, ASME NQA-1 Quality Assurance Program Requirements for Nuclear Facilities and ANSI/ASQC E4-19xx Specifications and Guidelines for Quality Systems for Environmental Data Collection and Environmental Technology Programs. The purpose of the MWIP QA program is to establish controls which address the requirements in 5700.6C, with the intent to minimize risks and potential environmental impacts; and to maximize environmental protection, health, safety, reliability, and performance in all program activities. QA program controls are established to assure that each participating organization conducts its activities in a manner consistent with risks posed by those activities.

  15. UMTRA Project Office quality assurance program plan. Revision 6

    International Nuclear Information System (INIS)

    1994-09-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project was established to accomplish remedial actions at inactive uranium mill tailings sites. The UMTRA Project's mission is to stabilize and control the residual radioactive materials at designated sites in a safe and environmentally sound manner so as to minimize or eliminate radiation health hazards to the public. Because these efforts may involve possible risks to public health and safety, a quality assurance (QA) program that conforms to the applicable criteria has been established to control the quality of the work. This document, the Quality Assurance Program Plan (QAPP), brings into one document the essential criteria to be applied on a selective basis, depending upon the nature of the activity being conducted, and describes how those criteria shall be applied to the UMTRA Project. QA requirements contained in this QAPP shall apply to all personnel, processes, and activities, including planning, scheduling, and cost control, performed by the UMTRA Project Office and its contractors

  16. Quality plan and configuration management in complex systems

    International Nuclear Information System (INIS)

    Gonzalez Junto, J.; Merchan Teyssiere

    1993-01-01

    Since the Second World War, the philosophy behind the quality systems of industries and service companies has evolved to embrace the whole life cycle of the product, system or service. In this evolution process, quality has become a strategic factor in the survival of entreprises. The first steps in trying to establish quality systems were taken for the armed forces, followed by space, aeronautical and nuclear projects, whose products were more and more complex and sophisticated. These systems were established by means of quality plans or programmes, and their basic objective was to guarantee a high safety level for the user and/or the general population. In later years, the main concern was to reach a determined quality level not only in one phase of the product life, but in the complete life cycle of the final product. Today a new goal is established and pursued: better quality of the product, service or system life cycle at a lower cost. Methods of improving the quality of systems and processes are the subject of numerous initiatives and studies, to better availability and maintainability of complex equipment or installations, with an extended useful life and greater requirements. Experience in the performance of complex projects shows that a higher quality may be obtained through designing a comprehensive quality plan which pays special attention to information management and modifications of the original design. Obtaining a high reliability level for an installation (equipment, systems, etc), increasing its availability and rationalizing its maintenance may be little less than fanciful without a deep knowledge of the installation, of its activities and its current status in day-to-day operation, which shows the importance of truthful information available to operators and corresponding exactly to their needs. In this frame of mind, a quality plan comprising a configuration management system of information and documents constitutes the basic support tool for

  17. 78 FR 59840 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Science.gov (United States)

    2013-09-30

    ...] Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management District... of plan. * * * * * (c) * * * (428) * * * (i) * * * (B) Antelope Valley Air Quality Management...) * * * (i) * * * (B) Antelope Valley Air Quality Management District. (1) Rule 431.1, ``Sulfur Content of...

  18. 76 FR 44535 - Revisions to the California State Implementation Plan, Northern Sierra Air Quality Management...

    Science.gov (United States)

    2011-07-26

    ... the California State Implementation Plan, Northern Sierra Air Quality Management District, Sacramento Metropolitan Air Quality Management District, and South Coast Air Quality Management District AGENCY... the Northern Sierra Air Quality Management District (NSAQMD), Sacramento Metropolitan Air Quality...

  19. Natural gas quality for the future. Part 2

    International Nuclear Information System (INIS)

    Klooster, J.; Metselaar, E.; Warringa, G.; Levinsky, H.B.; Van Rij, M.L.D.

    2011-03-01

    By request of various market parties (suppliers and users of natural gas), the Dutch Ministry of Economic Affairs, Agriculture and Innovation (ELI) took a leading role in anticipating the future changes in gas quality. To integrate anticipated gases in the Dutch gas supply, measures will be required that can prevent the undesired effects on safety and effectiveness as mentioned in Part 1 of this study; at the same time the possible impact of these measures on security of supply must be minimized. [nl

  20. 242-A evaporator quality assurance project plan: Revision 1

    International Nuclear Information System (INIS)

    Tucker, B.J.

    1994-01-01

    The scope of this quality assurance project plan (Plan) is sampling and analytical services including, but not limited to, sample receipt, handling and storage, analytical measurements, submittal of data deliverables, archiving selected portions of samples, returning unneeded sample material to Westinghouse Hanford Company (WHC), and/or sample disposal associated with candidate feed samples and process condensate compliance samples. Sampling and shipping activities are also included within the scope. The purpose of this project is to provide planning, implementation, and assessment guidance for achieving established data quality objectives measurement parameters. This Plan requires onsite and offsite laboratories to conform to that guidance. Laboratory conformance will help ensure that quality data are being generated and therefore, that the 242-A evaporator is operating in a safe and compliant manner. The 242-A evaporator feed stream originates from double-shell tanks (DSTs) identified as candidate feed tanks. The 242-A evaporator reduces the volume of aqueous waste contained in DSTs by boiling off water and sending it to the Liquid Effluent Retention Facility (LERF) storage basin before further treatment. The slurry product is returned to DSTs. Evaporation results in considerable savings by reducing the volume of mixed waste for disposal

  1. Federal Facilities Compliance Act, Draft Site Treatment Plan: Compliance Plan Volume. Part 2, Volume 2

    International Nuclear Information System (INIS)

    1994-01-01

    This document presents the details of the implementation of the Site Treatment Plan developed by Ames Laboratory in compliance with the Federal Facilities Compliance Act. Topics discussed in this document include: implementation of the plan; milestones; annual updates to the plan; inclusion of new waste streams; modifications of the plan; funding considerations; low-level mixed waste treatment plan and schedules; and TRU mixed waste streams

  2. Healthcare Strategic Planning as Part of National and Regional Development in the Israeli Galilee: A Case Study of the Planning Process.

    Science.gov (United States)

    Peled, Ronit; Schenirer, Jerry

    2009-10-01

    This article describes a systematic process of geographic and strategic planning for healthcare services as a part of a regional development plan in the Israeli Galilee. The planning process consisted of three stages: (a) assessment of needs, demand and existing resources; (b) prioritisation of initiatives; and (c) scheduling of theoretical priorities. For many years the region has suffered from inequities and inequalities regarding the availability and accessibility of a regional healthcare system, resulting in high mortality and morbidity rates and low quality of life. The aim of the healthcare strategic plan was to suggest initiatives and actions to be taken in order to improve healthcare provision and the health and wellbeing of local residents.

  3. Audit of an automated checklist for quality control of radiotherapy treatment plans

    International Nuclear Information System (INIS)

    Breen, Stephen L.; Zhang Beibei

    2010-01-01

    Purpose: To assess the effect of adding an automated checklist to the treatment planning process for head and neck intensity-modulated radiotherapy. Methods: Plans produced within our treatment planning system were evaluated at the planners' discretion with an automated checklist of more than twenty planning parameters. Plans were rated as accepted or rejected for treatment, during regular review by radiation oncologists and physicists as part of our quality control program. The rates of errors and their types were characterised prior to the implementation of the checklist and with the checklist. Results: Without the checklist, 5.9% of plans were rejected; the use of the checklist reduced the rejection rate to 3.1%. The checklist was used for 64.7% of plans. Pareto analysis of the causes of rejection showed that the checklist reduced the number of causes of rejections from twelve to seven. Conclusions: The use of an automated checklist has reduced the need for reworking of treatment plans. With the use of the checklist, most rejections were due to errors in prescription or inadequate dose distributions. Use of the checklist by planners must be increased to maximise improvements in planning efficiency.

  4. Is EIA part of the wind power planning problem?

    Energy Technology Data Exchange (ETDEWEB)

    Smart, Duncan Ewan; Stojanovic, Timothy A., E-mail: tas21@st-andrews.ac.uk; Warren, Charles R.

    2014-11-15

    This research evaluates the importance and effectiveness of Environmental Impact Assessment (EIA) within wind farm planning debates, drawing on insights from case studies in Scotland. Despite general public support for renewable energy on the grounds that it is needed to tackle climate change and implement sustainable development, many proposed wind farms encounter significant resistance. The importance of planning issues and (EIA) processes has arguably been overlooked within recent wind farm social acceptability discourse. Through semi-structured interviews with key stakeholders and textual analysis of EIA documents, the characteristics of EIA are assessed in terms of its perceived purpose and performance. The data show that whilst respondents perceive EIA to be important, they express concerns about bias and about the inability of EIA to address climate change and wind farm decommissioning issues adequately. Furthermore, the research identifies key issues which impede the effectiveness of EIA, and reveals differences between theoretical and practical framings of EIA. The paper questions the assumption that EIA is a universally applicable tool, and argues that its effectiveness should be analysed in the context of specific development sectors. The article concludes by reviewing whether the recently amended EIA Directive (2014/52/EU) could resolve identified problems within national EIA practice. - Highlights: • Evaluation of EIA for onshore wind farm planning in Scotland. • EIA is important for multiple aspects of onshore wind farm planning. • Multiple substantive deficiencies of relevance to wind farm planning exist in EIA. • Further research into EIA effectiveness for specific development types is required. • Directive 2014/52/EU may improve EIA effectiveness within wind farm planning.

  5. Is EIA part of the wind power planning problem?

    International Nuclear Information System (INIS)

    Smart, Duncan Ewan; Stojanovic, Timothy A.; Warren, Charles R.

    2014-01-01

    This research evaluates the importance and effectiveness of Environmental Impact Assessment (EIA) within wind farm planning debates, drawing on insights from case studies in Scotland. Despite general public support for renewable energy on the grounds that it is needed to tackle climate change and implement sustainable development, many proposed wind farms encounter significant resistance. The importance of planning issues and (EIA) processes has arguably been overlooked within recent wind farm social acceptability discourse. Through semi-structured interviews with key stakeholders and textual analysis of EIA documents, the characteristics of EIA are assessed in terms of its perceived purpose and performance. The data show that whilst respondents perceive EIA to be important, they express concerns about bias and about the inability of EIA to address climate change and wind farm decommissioning issues adequately. Furthermore, the research identifies key issues which impede the effectiveness of EIA, and reveals differences between theoretical and practical framings of EIA. The paper questions the assumption that EIA is a universally applicable tool, and argues that its effectiveness should be analysed in the context of specific development sectors. The article concludes by reviewing whether the recently amended EIA Directive (2014/52/EU) could resolve identified problems within national EIA practice. - Highlights: • Evaluation of EIA for onshore wind farm planning in Scotland. • EIA is important for multiple aspects of onshore wind farm planning. • Multiple substantive deficiencies of relevance to wind farm planning exist in EIA. • Further research into EIA effectiveness for specific development types is required. • Directive 2014/52/EU may improve EIA effectiveness within wind farm planning

  6. INDUSTRIAL ENTERPRISE TAX PLANNING AS PART OF EXPENSE OPTIMIZATION STRATEGY

    Directory of Open Access Journals (Sweden)

    A. P. Garnov

    2012-01-01

    Full Text Available Tax liability planning is vital for industrial enterprises to reduce their tax burden and thus reduce expenses of the organization for a certain period. Industrial enterprises are among main taxpayers in the Russian Federation, and recommendations given in the article on topical issues related to planning of tax obligations will help top managers of the enterprises to avoid unnecessary financial losses and to ensure further growth and development of their organizations. Attention is focused on specifics of the industrial enterprises’ activities under present conditions due to the nature and particular features of their operation.

  7. INDUSTRIAL ENTERPRISE TAX PLANNING AS PART OF EXPENSE OPTIMIZATION STRATEGY

    Directory of Open Access Journals (Sweden)

    A. P. Garnov

    2012-01-01

    Full Text Available Tax liability planning is vital for industrial enterprises to reduce their tax burden and thus reduce expenses of the organization for a certain period. Industrial enterprises are among main taxpayers in the Russian Federation, and recommendations given in the article on topical issues relatedto planning of tax obligations will help top managers of the enterprises to avoid unnecessary financial losses and to ensure further growth and development of their organizations. Attention is focused on specifics of the industrial enterprises’ activities under present conditions due to thenature and particular features of their operation.

  8. Visit, revamp, and revitalize your business plan: Part 2.

    Science.gov (United States)

    Waldron, David

    2011-01-01

    The diagnostic imaging department strives for the highest quality outcomes in imaging quality, in diagnostic reporting, and in providing a caring patient experience while also satisfying the needs of referring physicians. Understand how tools such as process mapping and concepts such as Six Sigma and Lean Six Sigma can be used to facilitate quality improvements and team building, resulting in staff led process improvement initiatives. Discover how to integrate a continuous staff management cycle to implement process improvements,capture the promised performance improvements, and achieve a culture change away from the "way it has always been done".

  9. Hanford analytical services quality assurance plan. Revision 1

    International Nuclear Information System (INIS)

    1995-02-01

    This document, the Hanford Analytical Services Quality Assurance Plan (HASQAP), is issued by the U.S. Department of Energy, Richland Operations Office (RL). The HASQAP establishes quality requirements in response to U.S. Department of Energy (DOE) Order 5700.6C, Quality Assurance (10 CFR 830.120, open-quotes Quality Assurance Requirementsclose quotes). The HASQAP is designed to meet the needs of the RL for controlling the of analytical chemistry services provided by laboratory operations. The HASQAP is issued through the Analytical Services Branch of the Waste Management Division. The Analytical Services Branch is designated by the RL as having the responsibility for oversight management of laboratory operations under the Waste Management Division. The laboratories conduct sample analyses under several regulatory statutes, such as the Clean Air Act and the Clean Water Act. Sample analysis in support of the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) is a major role of the laboratory operations

  10. Astronomical Instrumentation Systems Quality Management Planning: AISQMP (Abstract)

    Science.gov (United States)

    Goldbaum, J.

    2017-12-01

    (Abstract only) The capability of small aperture astronomical instrumentation systems (AIS) to make meaningful scientific contributions has never been better. The purpose of AIS quality management planning (AISQMP) is to ensure the quality of these contributions such that they are both valid and reliable. The first step involved with AISQMP is to specify objective quality measures not just for the AIS final product, but also for the instrumentation used in its production. The next step is to set up a process to track these measures and control for any unwanted variation. The final step is continual effort applied to reducing variation and obtaining measured values near optimal theoretical performance. This paper provides an overview of AISQMP while focusing on objective quality measures applied to astronomical imaging systems.

  11. Quality-assurance plan for water-quality activities in the U.S. Geological Survey Washington Water Science Center

    Science.gov (United States)

    Conn, Kathleen E.; Huffman, Raegan L.; Barton, Cynthia

    2017-05-08

    In accordance with guidelines set forth by the Office of Water Quality in the Water Mission Area of the U.S. Geological Survey, a quality-assurance plan has been created for use by the Washington Water Science Center (WAWSC) in conducting water-quality activities. This qualityassurance plan documents the standards, policies, and procedures used by the WAWSC for activities related to the collection, processing, storage, analysis, and publication of water-quality data. The policies and procedures documented in this quality-assurance plan for water-quality activities complement the quality-assurance plans for surface-water and groundwater activities at the WAWSC.

  12. Improving IMRT-plan quality with MLC leaf position refinement post plan optimization

    International Nuclear Information System (INIS)

    Niu Ying; Zhang Guowei; Berman, Barry L.; Parke, William C.; Yi Byongyong; Yu, Cedric X.

    2012-01-01

    Purpose: In intensity-modulated radiation therapy (IMRT) planning, reducing the pencil-beam size may lead to a significant improvement in dose conformity, but also increase the time needed for the dose calculation and plan optimization. The authors develop and evaluate a postoptimization refinement (POpR) method, which makes fine adjustments to the multileaf collimator (MLC) leaf positions after plan optimization, enhancing the spatial precision and improving the plan quality without a significant impact on the computational burden. Methods: The authors’ POpR method is implemented using a commercial treatment planning system based on direct aperture optimization. After an IMRT plan is optimized using pencil beams with regular pencil-beam step size, a greedy search is conducted by looping through all of the involved MLC leaves to see if moving the MLC leaf in or out by half of a pencil-beam step size will improve the objective function value. The half-sized pencil beams, which are used for updating dose distribution in the greedy search, are derived from the existing full-sized pencil beams without need for further pencil-beam dose calculations. A benchmark phantom case and a head-and-neck (HN) case are studied for testing the authors’ POpR method. Results: Using a benchmark phantom and a HN case, the authors have verified that their POpR method can be an efficient technique in the IMRT planning process. Effectiveness of POpR is confirmed by noting significant improvements in objective function values. Dosimetric benefits of POpR are comparable to those of using a finer pencil-beam size from the optimization start, but with far less computation and time. Conclusions: The POpR is a feasible and practical method to significantly improve IMRT-plan quality without compromising the planning efficiency.

  13. A plan quality classifier derived with overlap-wall-histogram of hollow organs for automatic IMRT plan quality control of prostate cancer cases

    Directory of Open Access Journals (Sweden)

    Ting Song

    2014-03-01

    Full Text Available Purpose: We developed a plan quality classification model to assess IMRT plan quality of prostate cancer patients for automatic plan quality control. Methods: For hollow organs such as rectum and bladder, dose-wall-histogram (DWH was used to evaluate OAR dose sparing in our institution. Correspondingly, we proposed a new descriptor called overlap-wall-histogram (OWH to describe the complex spatial relationship between PTV and a hollow organ. Two metrics calculated from the OWH and DWH are introduced to quantitatively evaluate the difficulty of patient geometry for planning and plan quality in terms of OAR sparing, respectively. A linear correlation between these two metrics was observed after plotting plan quality metric as a function of geometry difficulty metric studied from a database of prostate cases treated in our institution with acceptable plan quality. Thus, a fitting line was built acting as the boundary of high quality and poor quality plans. A query plan falling above the boundary is assessed as high quality, vice versa poor quality. Results: 15 prostate IMRT plans were used to test our model. One was identified as poor quality and the others were common-level. After re-planning all plans, the dose constraints for bladder wall W75 (percentage of wall receiving more than 75Gy, W70, W65 and W60 can be reduced by 3.34%, 3%, 6.99%, 6.54% for that poor quality plan and 1.11%, 0.95%, 1.45% and 1.81% averagely for the common-level quality group, without sacrificing PTV coverage and rectum dose sparing. Conclusion: An effective model was built to provide automatic IMRT plan quality control by evaluating hollow OAR dose sparing for prostate cancer patients. Furthermore, for the query plan with poor quality, potential improvement of plan quality can be estimated and a good reference plan with similar or harder geometry can be automatically chosen from our database to help guide the re-planning if necessary.---------------------------Cite this

  14. Transportation Planning and Quality of Life: Where Do They Intersect?

    Science.gov (United States)

    Lee, Richard J.

    2016-01-01

    Policy makers and researchers are increasingly recognizing the connections between public health and transportation, but health improvements are typically framed from a physical health perspective rather than considering broader quality of life (QOL) impacts. Currently, there is a limited understanding of the ways in which transportation and QOL intersect, and little is known about how metropolitan planning organizations (MPOs) in the United States are addressing QOL outcomes. This study addressed these gaps by developing a conceptual framework holistically linking transportation to QOL. The proposed framework identified four transportation-related QOL dimensions—physical, mental, social, and economic well-being—which are predominantly influenced by three components of the transportation system: mobility/accessibility, the built environment, and vehicle traffic. This framework then formed the basis for a content analysis of 148 long-range transportation plans in the United States to evaluate the extent to which QOL is being considered in the planning process. The results of the analysis and a follow-up examination of 13 plans revealed that MPOs are inconsistently addressing QOL. Plans primarily targeted QOL enhancement from the perspective of physical well-being, while mental and social well-being were rarely considered. Policy recommendations were provided to more comprehensively integrate QOL into the transportation planning process. PMID:27546998

  15. 32 CFR Appendix D to Part 651 - Public Participation Plan

    Science.gov (United States)

    2010-07-01

    ... as news releases to local media, announcements to local citizens groups, and Commander's letters... included in the scoping process (AR 360-5). The plan must include the following: (1) Information..., announcements to local citizens groups, and Commander's letters at each phase or milestone (more frequently if...

  16. A Total Quality-Control Plan with Right-Sized Statistical Quality-Control.

    Science.gov (United States)

    Westgard, James O

    2017-03-01

    A new Clinical Laboratory Improvement Amendments option for risk-based quality-control (QC) plans became effective in January, 2016. Called an Individualized QC Plan, this option requires the laboratory to perform a risk assessment, develop a QC plan, and implement a QC program to monitor ongoing performance of the QC plan. Difficulties in performing a risk assessment may limit validity of an Individualized QC Plan. A better alternative is to develop a Total QC Plan including a right-sized statistical QC procedure to detect medically important errors. Westgard Sigma Rules provides a simple way to select the right control rules and the right number of control measurements. Copyright © 2016 Elsevier Inc. All rights reserved.

  17. UMTRA technical assistance contractor quality assurance program plan

    International Nuclear Information System (INIS)

    1994-10-01

    This Quality Assurance Program Plan (QAPP) provides the primary requirements for the integration of quality functions into all Technical Assistance Contractor (TAC) Project organization activities. The QAPP is the written directive authorized by the TAc Program Manager to accomplish this task and to implement procedures that provide the controls and sound management practices needed to ensure TAC contractual obligations are met. The QA program is designed to use monitoring, audit, and surveillance functions as management tools to ensure that all Project organization functions are executed in a manner that will protect public health and safety, promote the success of the Project, and meet or exceed contract requirements

  18. A Study on the Software Quality Assurance Plan

    International Nuclear Information System (INIS)

    Kim, Hyun Tae

    2006-01-01

    On 25 August 2006, the CMMI V1.2 (Capability Maturity Model Integration Version 1.2) was released with the new title CMMI-DEV (CMMI for Development) which supersedes the CMMI-SE/SW (CMMI for systems engineering and software engineering) V1.1. This study discusses the application of IEEE Std 730-2002, IEEE Standard for Software Quality Assurance Plans, for the implementation of the Process and Product Quality Assurance (PPQA) process area (PA) of the CMMI-DEV

  19. 200 Area Liquid Effluent Facilities -- Quality assurance program plan

    International Nuclear Information System (INIS)

    Fernandez, L.

    1995-01-01

    This Quality Assurance Program Plan (QAPP) describes the quality assurance and management controls used by the 200 Area Liquid Effluent Facilities (LEF) to perform its activities in accordance with DOE Order 5700.6C. The 200 Area LEF consists of the following facilities: Effluent Treatment Facility (ETF); Treated Effluent Disposal Facility (TEDF); Liquid Effluent Retention facility (LERF); and Truck Loading Facility -- (Project W291). The intent is to ensure that all activities such as collection of effluents, treatment, concentration of secondary wastes, verification, sampling and disposal of treated effluents and solids related with the LEF operations, conform to established requirements

  20. Quality assurance program plan for cesium legacy project

    International Nuclear Information System (INIS)

    Tanke, J.M.

    1997-01-01

    This Quality Assurance Program Plan (QAPP) provides information on how the Quality Assurance Program is implemented for the Cesium Legacy Project. It applies to those items and tasks which affect the completion of activities identified in the work breakdown structure of the Project Management Plan (PMP). These activities include all aspects of cask transportation, project related operations within the 324 Building, and waste management as it relates to the specific activities of this project. General facility activities (i.e. 324 Building Operations, Central Waste Complex Operations, etc.) are covered in other appropriate QAPPs. The 324 Building is currently transitioning from being a Pacific Northwest National Laboratory (PNNL) managed facility to a B and W Hanford Company (BWHC) managed facility. During this transition process existing PNNL procedures and documents will be utilized until replaced by BWHC procedures and documents

  1. Quality-assurance plan for groundwater activities, U.S. Geological Survey, Washington Water Science Center

    Science.gov (United States)

    Kozar, Mark D.; Kahle, Sue C.

    2013-01-01

    This report documents the standard procedures, policies, and field methods used by the U.S. Geological Survey’s (USGS) Washington Water Science Center staff for activities related to the collection, processing, analysis, storage, and publication of groundwater data. This groundwater quality-assurance plan changes through time to accommodate new methods and requirements developed by the Washington Water Science Center and the USGS Office of Groundwater. The plan is based largely on requirements and guidelines provided by the USGS Office of Groundwater, or the USGS Water Mission Area. Regular updates to this plan represent an integral part of the quality-assurance process. Because numerous policy memoranda have been issued by the Office of Groundwater since the previous groundwater quality assurance plan was written, this report is a substantial revision of the previous report, supplants it, and contains significant additional policies not covered in the previous report. This updated plan includes information related to the organization and responsibilities of USGS Washington Water Science Center staff, training, safety, project proposal development, project review procedures, data collection activities, data processing activities, report review procedures, and archiving of field data and interpretative information pertaining to groundwater flow models, borehole aquifer tests, and aquifer tests. Important updates from the previous groundwater quality assurance plan include: (1) procedures for documenting and archiving of groundwater flow models; (2) revisions to procedures and policies for the creation of sites in the Groundwater Site Inventory database; (3) adoption of new water-level forms to be used within the USGS Washington Water Science Center; (4) procedures for future creation of borehole geophysics, surface geophysics, and aquifer-test archives; and (5) use of the USGS Multi Optional Network Key Entry System software for entry of routine water-level data

  2. [Quality assurance and quality improvement in medical practice. Part 1. Definition and importance of quality in medical practice].

    Science.gov (United States)

    Godény, Sándor

    2012-01-22

    In Hungary, financing of healthcare has decreased relative to the GDP, while the health status of the population is still ranks among the worst in the European Union. Since healthcare financing is not expected to increase, the number of practicing doctors per capita is continuously decreasing. In the coming years, it is an important question that in this situation what methods can be used to prevent further deterioration of the health status of the Hungarian population, and within this is the role of the quality approach, and different methods of quality management. In the present and the forthcoming two articles those standpoints will be summarized which support the need for the integration of quality assurance in the everyday medical practice. In the first part the importance of quality thinking, quality management, quality assurance, necessity of quality measurement and improvement, furthermore, advantages of the quality systems will be discussed.

  3. Software quality assurance plan for void fraction instrument

    International Nuclear Information System (INIS)

    Gimera, M.

    1994-01-01

    Waste Tank SY-101 has been the focus of extensive characterization work over the past few years. The waste continually generates gases, most notably hydrogen, which are periodically released from the waste. Gas can be trapped in tank waste in three forms: as void gas (bubbles), dissolved gas, or absorbed gas. Void fraction is the volume percentage of a given sample that is comprised of void gas. The void fraction instrument (VFI) acquires the data necessary to calculate void fraction. This document covers the product, Void Fraction Data Acquisition Software. The void fraction software being developed will have the ability to control the void fraction instrument hardware and acquire data necessary to calculate the void fraction in samples. This document provides the software quality assurance plan, verification and validation plan, and configuration management plan for developing the software for the instrumentation that will be used to obtain void fraction data from Tank SY-101

  4. Effect of beamlet step-size on IMRT plan quality

    International Nuclear Information System (INIS)

    Zhang Guowei; Jiang Ziping; Shepard, David; Earl, Matt; Yu, Cedric

    2005-01-01

    We have studied the degree to which beamlet step-size impacts the quality of intensity modulated radiation therapy (IMRT) treatment plans. Treatment planning for IMRT begins with the application of a grid that divides each beam's-eye-view of the target into a number of smaller beamlets (pencil beams) of radiation. The total dose is computed as a weighted sum of the dose delivered by the individual beamlets. The width of each beamlet is set to match the width of the corresponding leaf of the multileaf collimator (MLC). The length of each beamlet (beamlet step-size) is parallel to the direction of leaf travel. The beamlet step-size represents the minimum stepping distance of the leaves of the MLC and is typically predetermined by the treatment planning system. This selection imposes an artificial constraint because the leaves of the MLC and the jaws can both move continuously. Removing the constraint can potentially improve the IMRT plan quality. In this study, the optimized results were achieved using an aperture-based inverse planning technique called direct aperture optimization (DAO). We have tested the relationship between pencil beam step-size and plan quality using the American College of Radiology's IMRT test case. For this case, a series of IMRT treatment plans were produced using beamlet step-sizes of 1, 2, 5, and 10 mm. Continuous improvements were seen with each reduction in beamlet step size. The maximum dose to the planning target volume (PTV) was reduced from 134.7% to 121.5% and the mean dose to the organ at risk (OAR) was reduced from 38.5% to 28.2% as the beamlet step-size was reduced from 10 to 1 mm. The smaller pencil beam sizes also led to steeper dose gradients at the junction between the target and the critical structure with gradients of 6.0, 7.6, 8.7, and 9.1 dose%/mm achieved for beamlet step sizes of 10, 5, 2, and 1 mm, respectively

  5. Software quality assurance plans for safety-critical software

    International Nuclear Information System (INIS)

    Liddle, P.

    2006-01-01

    Application software is defined as safety-critical if a fault in the software could prevent the system components from performing their nuclear-safety functions. Therefore, for nuclear-safety systems, the AREVA TELEPERM R XS (TXS) system is classified 1E, as defined in the Inst. of Electrical and Electronics Engineers (IEEE) Std 603-1998. The application software is classified as Software Integrity Level (SIL)-4, as defined in IEEE Std 7-4.3.2-2003. The AREVA NP Inc. Software Program Manual (SPM) describes the measures taken to ensure that the TELEPERM XS application software attains a level of quality commensurate with its importance to safety. The manual also describes how TELEPERM XS correctly performs the required safety functions and conforms to established technical and documentation requirements, conventions, rules, and standards. The program manual covers the requirements definition, detailed design, integration, and test phases for the TELEPERM XS application software, and supporting software created by AREVA NP Inc. The SPM is required for all safety-related TELEPERM XS system applications. The program comprises several basic plans and practices: 1. A Software Quality-Assurance Plan (SQAP) that describes the processes necessary to ensure that the software attains a level of quality commensurate with its importance to safety function. 2. A Software Safety Plan (SSP) that identifies the process to reasonably ensure that safety-critical software performs as intended during all abnormal conditions and events, and does not introduce any new hazards that could jeopardize the health and safety of the public. 3. A Software Verification and Validation (V and V) Plan that describes the method of ensuring the software is in accordance with the requirements. 4. A Software Configuration Management Plan (SCMP) that describes the method of maintaining the software in an identifiable state at all times. 5. A Software Operations and Maintenance Plan (SO and MP) that

  6. Current status of quality assurance of treatment planning systems

    International Nuclear Information System (INIS)

    Mijnheer, B.J.

    1997-01-01

    A review is given of the current status of quality assurance of treatment planning systems. At this moment only one comprehensive report is available. In order to review national activities a questionnaire has been distributed amongst national societies of medical physicists. From the 23 responding countries, 8 indicated that only limited efforts are underway, 8 answered that a working group is evaluating their specific national requirements while in 5 countries a document is drafted. The highlights of these reports have been summarized. (author)

  7. 324 Facility B-Cell quality process plan

    International Nuclear Information System (INIS)

    Carlson, J.L.

    1998-01-01

    This report documents the quality process plan for the restart of a hot cell in the B Plant, originally a bismuth phosphate processing facility, but later converted to a waste fractionation plant. B-Cell is currently being cleaned out and deactivated. TPA Milestone M-89-02 dictates that all mixed waste and equipment be removed from B-Cell by 5/31/1999. This report describes the major activities that remain for completion of the TPA milestone

  8. Planning for quality? Assessing the role of quality of place in current Dutch planning practice

    NARCIS (Netherlands)

    Kloosterman, R.C.; Trip, J.J.

    2011-01-01

    In recent years, an attractive urban environment has increasingly been recognized as a factor of local competitiveness in a globalizing world. Notably, Richard Florida and Charles Landry have stressed the importance of the concept of quality of place. The implications of their often criticized, but

  9. A platform for quality management in research institutes (part II

    Directory of Open Access Journals (Sweden)

    Klembalska Agnieszka

    2016-09-01

    Full Text Available In the recent years there has been a particularly strong pressure on changing old structures and management models in research institutes. Contemporary research institutes are scientific units which are commercial in character – almost 80% of funds come from companies and contractual research activity and services. They are the basic sector of science aiming at cooperation with the economy, applied and innovative research. In order to maintain the current and start new cooperation it is necessary to pay particular attention to maintaining, improving and exposing high level of quality of conducted activity. Taking into consideration the necessity of carrying out ever more complex research projects, conducting activity requiring fast reaction to change, risk analysis, which is assessed every year by the Ministry of Science and Higher Education – it seems that it is necessary to apply tools supporting the assessment of quality. In the proposed three-aspect perspective the following scopes of activity are emphasized: implemented quality management systems, area of scientific information and the sphere of cooperation with the client. This article constitutes the continuation of the subjects discussed in the first part – an extension of issues associated with the scope of responsibilities of particular Sections of the proposed Quality Management Platform in research institutes.

  10. Quality assurance program plan for SNF characterization support project

    International Nuclear Information System (INIS)

    Tanke, J.M.

    1997-01-01

    This Quality Assurance Program Plan (QAPP) provides information on how the Quality Assurance Program is implemented for the Spent Nuclear Fuel Characterization Support Project. This QAPP has been developed specifically for the Spent Nuclear Fuel Characterization Support Project, per Letter of Instruction (LOI) from Duke Engineering and Services Company, letter No. DESH-9655870, dated Nov. 22, 1996. It applies to those items and tasks which affect the completion of activities identified in the work breakdown structure of the Project Management Plan (PMP) and LOI. These activities include installation of sectioning equipment and furnace, surface and subsurface examinations, sectioning for metallography, and element drying and conditioning testing, as well as project related operations within the 327 facility as it relates to the specific activities of this project. General facility activities are covered in other appropriate QA-PPS. In addition, this QAPP supports the related quality assurance activities addressed in CM-2-14, Hazardous Material Packaging and Shipping,1261 and HSRCM-1, Hanford Site Radiological Control Manual. The 327 Building is currently transitioning from being a Pacific Northwest National Laboratory (PNNL) managed facility to a Babcock and Wilcox Hanford Company (BVMC) managed facility. During this transition process existing procedures and documents will be utilized until replaced by BVMC procedures and documents. These documents conform to the requirements found in PNL-MA-70, Quality Assurance Manual and PNL-MA-8 1, Hazardous Materials Shipping Manual. The Quality Assurance Program Index (QAPI) contained in Table 1 provides a matrix which shows how project activities relate to IO CFR 830.120 and 5700.6C criteria. Quality Assurance program requirements will be addressed separate from the requirements specified in this document. Other Hanford Site organizations/companies may be utilized in support of this project and the subject organizations are

  11. Large hadron collider (LHC) project quality assurance plan

    Energy Technology Data Exchange (ETDEWEB)

    Gullo, Lisa; Karpenko, Victor; Robinson, Kem; Turner, William; Wong, Otis

    2002-09-30

    The LHC Quality Assurance Plan is a set of operating principles, requirements, and practices used to support Berkeley Lab's participation in the Large Hadron Collider Project. The LHC/QAP is intended to achieve reliable, safe, and quality performance in the LHC project activities. The LHC/QAP is also designed to fulfill the following objectives: (1) The LHC/QAP is Berkeley Lab's QA program document that describes the elements necessary to integrate quality assurance, safety management, and conduct of operations into the Berkeley Lab's portion of the LHC operations. (2) The LHC/QAP provides the framework for Berkeley Lab LHC Project administrators, managers, supervisors, and staff to plan, manage, perform, and assess their Laboratory work. (3) The LHC/QAP is the compliance document that conforms to the requirements of the Laboratory's Work Smart Standards for quality assurance (DOE O 414.1, 10 CFR 830.120), facility operations (DOE O 5480.19), and safety management (DOE P 450.4).

  12. UMTRA project technical assistance contractor quality assurance implementation plan

    International Nuclear Information System (INIS)

    1994-03-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Technical Assistance contractor (TAC) Quality Assurance Implementation Plan (QAIP) outlines the primary requirements for integrating quality functions for TAC technical activities applied to the surface and ground water phases of the UMTRA Project. The QAIP is subordinate to the latest issue of the UMTRA Project TAC Quality Assurance Program Plan (QAPP) (DOE, 1993a), which was developed using US Department of Energy (DOE) Order 5700.6C quality assurance (QA) criteria. The QAIP addresses technical aspects of the TAC UMTRA Project surface and ground water programs. All QA issues in the QAIP shall comply with requirements contained in the TAC QAPP (DOE, 1933a). Because industry standards for data acquisition and data control are not addressed in DOE Order 5700.6C, the QAIP has been formatted to the 14 US Environmental Protection Agency (EPA) Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) QA requirements. DOE Order 5700.6C criteria that are not contained in the CERCLA requirements are added to the QAIP as additional requirements in Sections 15.0 through 18.0. Project documents that contain CERCLA requirements and 5700.6 criteria shall be referenced in this document to avoid duplication. Referenced documents are not included in this QAIP but are available through the UMTRA Project Document Control Center

  13. Large hadron collider (LHC) project quality assurance plan

    International Nuclear Information System (INIS)

    Gullo, Lisa; Karpenko, Victor; Robinson, Kem; Turner, William; Wong, Otis

    2002-01-01

    The LHC Quality Assurance Plan is a set of operating principles, requirements, and practices used to support Berkeley Lab's participation in the Large Hadron Collider Project. The LHC/QAP is intended to achieve reliable, safe, and quality performance in the LHC project activities. The LHC/QAP is also designed to fulfill the following objectives: (1) The LHC/QAP is Berkeley Lab's QA program document that describes the elements necessary to integrate quality assurance, safety management, and conduct of operations into the Berkeley Lab's portion of the LHC operations. (2) The LHC/QAP provides the framework for Berkeley Lab LHC Project administrators, managers, supervisors, and staff to plan, manage, perform, and assess their Laboratory work. (3) The LHC/QAP is the compliance document that conforms to the requirements of the Laboratory's Work Smart Standards for quality assurance (DOE O 414.1, 10 CFR 830.120), facility operations (DOE O 5480.19), and safety management (DOE P 450.4)

  14. Quality-assurance and data-management plan for water-quality activities in the Kansas Water Science Center, 2014

    Science.gov (United States)

    Rasmussen, Teresa J.; Bennett, Trudy J.; Foster, Guy M.; Graham, Jennifer L.; Putnam, James E.

    2014-01-01

    As the Nation’s largest water, earth, and biological science and civilian mapping information agency, the U.S. Geological Survey is relied on to collect high-quality data, and produce factual and impartial interpretive reports. This quality-assurance and data-management plan provides guidance for water-quality activities conducted by the Kansas Water Science Center. Policies and procedures are documented for activities related to planning, collecting, storing, documenting, tracking, verifying, approving, archiving, and disseminating water-quality data. The policies and procedures described in this plan complement quality-assurance plans for continuous water-quality monitoring, surface-water, and groundwater activities in Kansas.

  15. 77 FR 12495 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Science.gov (United States)

    2012-03-01

    ... the California State Implementation Plan, Antelope Valley Air Quality Management District and Mojave Desert Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Direct final... Quality Management District (AVAQMD) and Mojave Desert Air Quality Management District (MDAQMD) portion of...

  16. 76 FR 44493 - Revisions to the California State Implementation Plan, Northern Sierra Air Quality Management...

    Science.gov (United States)

    2011-07-26

    ... California State Implementation Plan, Northern Sierra Air Quality Management District, Sacramento Metropolitan Air Quality Management District, and South Coast Air Quality Management District AGENCY... approve revisions to the Northern Sierra Air Quality Management District (NSAQMD), Sacramento Metropolitan...

  17. 78 FR 21540 - Revisions to the California State Implementation Plan, Butte County Air Quality Management...

    Science.gov (United States)

    2013-04-11

    ... the California State Implementation Plan, Butte County Air Quality Management District and Sacramento Metropolitan Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Direct... Quality Management District (BCAQMD) and Sacramento Metropolitan Air Quality Management District (SMAQMD...

  18. 75 FR 40726 - Revisions to the California State Implementation Plan, Sacramento Metropolitan Air Quality...

    Science.gov (United States)

    2010-07-14

    ... the California State Implementation Plan, Sacramento Metropolitan Air Quality Management District and South Coast Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION... Metropolitan Air Quality Management District (SMAQMD) and South Coast Air Quality Management District (SCAQMD...

  19. UMTRA technical assistance contractor Quality Assurance Program Plan

    International Nuclear Information System (INIS)

    Pehrson, P.

    1993-01-01

    This Quality Assurance Program Plan (QAPP) provides the primary requirements for the integration of quality functions into all Technical Assistance Contractor (TAC) Project organization activities. The QAPP is the written directive authorized by the TAC Program Manager to accomplish this task and to implement procedures that provide the controls and sound management practices needed to ensure TAC contractual obligations are met. The QA program is designed to use monitoring, audit, and surveillance functions as management tools to ensure that all Project organization functions are executed in a manner that will protect public health and safety, promote the success of the Project, and meet or exceed contract requirements. The key to ensuring compliance with this directive is a two-step professional approach: utilize the quality system in all areas of activity, and generate a personal commitment from all personnel to provide quality service. The quality staff will be experienced, trained professionals capable of providing maximum flexibility to Project goal attainment. Such flexibility will enable the staff to be more cost effective and to further improve communication and coordination. To provide control details, this QAPP will be supplemented by approved standard operating procedures that provide requirements for performing the various TAC quality-related activities. These procedures shall describe applicable design input and document control activities and documentation

  20. Chemical Reactivity Testing for the National Spent Nuclear Fuel Program. Quality Assurance Project Plan

    International Nuclear Information System (INIS)

    Newsom, H.C.

    1999-01-01

    This quality assurance project plan (QAPjP) summarizes requirements used by Lockheed Martin Energy Systems, Incorporated (LMES) Development Division at Y-12 for conducting chemical reactivity testing of Department of Energy (DOE) owned spent nuclear fuel, sponsored by the National Spent Nuclear Fuel Program (NSNFP). The requirements are based on the NSNFP Statement of Work PRO-007 (Statement of Work for Laboratory Determination of Uranium Hydride Oxidation Reaction Kinetics.) This QAPjP will utilize the quality assurance program at Y-12, QA-101PD, revision 1, and existing implementing procedures for the most part in meeting the NSNFP Statement of Work PRO-007 requirements, exceptions will be noted

  1. The World Health Organization's water safety plan is much more than just an integrated drinking water quality management plan.

    Science.gov (United States)

    Viljoen, F C

    2010-01-01

    South Africa is a country of contrasts with far ranging variations in climate, precipitation rates, cultures, demographics, housing levels, education, wealth and skills levels. These differences have an impact on water services delivery as do expectations, affordability and available resources. Although South Africa has made much progress in supplying drinking water, the same cannot be said regarding water quality throughout the country. A concerted effort is currently underway to correct this situation and as part of this drive, water safety plans (WSP) are promoted. Rand Water, the largest water services provider in South Africa, used the World Health Organization (WHO) WSP framework as a guide for the development of its own WSP which was implemented in 2003. Through the process of implementation, Rand Water found the WHO WSP to be much more than just another integrated quality system.

  2. Quality Affordable Housing: A Theoretical Framework for Planning and Design of Quality Housing

    Directory of Open Access Journals (Sweden)

    Noor Sharipah Sultan Sidi

    2011-10-01

    Full Text Available The provision of adequate, good or quality housing for the population has always been a major challenge and task for most nations in the world particularly the developing countries. As such various measures have been undertaken towards this end. However, the major constraint or problem in this respect has always been in defining the criteria for quality housing and establishing the standards of quality housing particularly with respect to the parameters in the determination of quality as some of the parameters are subjective and contextual such as psychological, cultural and environmental aspects. This paper is aimed at discussing the concept of quality housing and establishing the parameters and theoretical framework which can be used by researchers, town planners, architects, policy makers and others in the formulation of criteria / guidelines for the planning and design of quality housing.

  3. Revisit, revamp, and revitalize your business plan: part 3.

    Science.gov (United States)

    Waldron, David

    2011-01-01

    Managing with financial statements is discussed, including fundamental definitions and conventions related to this process such as an income statement and a balance sheet. Balanced scorecards and dashboards can be used to measure progress and to communicate achievements. Steps taken to defining data using KPIs, sourcing data, and structuring the scorecard are outlined. A core part of managing with financial statements is understanding how to drive the business and engage the staff using balanced scorecards.

  4. Landscape Planning and Ecological Networks. Part A. A Rural System in Nuoro, Sardinia

    Directory of Open Access Journals (Sweden)

    Andrea De Montis

    2014-05-01

    Full Text Available Urban-rural landscape planning research is nowadays focusing on strategies and tools that support practitioners in designing integrated spaces starting from the analysis of local areas, where human and natural pressures interfere. A prominent framework is provided by the ecological networks, whose design regards the combination of a set of green areas or patches (the nodes interconnected through environmental corridors (the edges. Ecological networks are useful for biodiversity protection and enhancement, as they are able to counteract fragmentation, and to create or strengthen relations and exchanges among otherwise isolated elements. Biodiversity evolution, indeed, depends on the quantity and quality of spatial cohesion of natural areas.  In this paper, we aim at designing an ecological network for the periurban area on the town of Nuoro in central Sardinia. The narrative unfolds in two parts. Part A is presented in this paper and includes its methodological premises, i.e. biodiversity conservation and ecological network analysis and design, and the introductory elements of a spatial analysis on a pilot ecological network of one hundred patches. We locate patches by focusing on the ecosystems supported by the target vegetal species holm oak (Quercus ilex and cultivated or wild olive (Olea europaea var. sativa, O. europaea var. sylverstis. These are very common plants species in the municipality and some animal species are active as seed dispersal. The reminder, i.e. Part B, of the essay is presented in an homonymous paper that focuses on the illustration of the network analysis conceived as a monitoring system and, in future perspective, as a planning support system.

  5. Tank waste remediation system privatization phase I infrastructure, project W-519, Quality Assurance implementation plan

    International Nuclear Information System (INIS)

    HUSTON, J.J.

    1999-01-01

    This document has been prepared to identify the quality requirements for all products/activities developed by or for Project W-519. This plan is responsive to the Numatec Hanford Corporation, Quality Assurance Program Plan, NHC-MP-001

  6. SU-E-T-43: A Methodology for Quality Control of IMPT Treatment Plan Based On VMAT Plan

    Energy Technology Data Exchange (ETDEWEB)

    Jiang, S [UT MD Anderson Cancer Center (United States); Tianjin Medical University Cancer Institute and Hospital (China); Yang, Y [UT MD Anderson Cancer Center (United States); Tianjin First Center Hospital (China); Liao, L; Wang, X; Li, H; Zhu, X; Zhang, X [UT MD Anderson Cancer Center (United States)

    2015-06-15

    Purpose: IMPT plan design is highly dependent on planner’s experiences. VMAT plan design is relatively mature and can even be automated. The quality of IMPT plan designed by in-experienced planner could be inferior to that of VMAT plan designed by experienced planner or automatic planning software. Here we introduce a method for designing IMPT plan based on VMAT plan to ensure the IMPT plan be superior to IMRT/VMAT plan for majority clinical scenario. Methods: To design a new IMPT plan, a VMAT plan is first generated either by experienced planner or by in-house developed automatic planning system. An in-house developed tool is used to generate the dose volume constrains for the IMPT plan as plan template to Eclipse TPS. The beam angles for IMPT plan are selected based on the preferred angles in the VMAT plan. IMPT plan is designed by importing the plan objectives generated from VMAT plan. Majority thoracic IMPT plans are designed using this plan approach in our center. In this work, a thoracic IMPT plan under RTOG 1308 protocol is selected to demonstrate the effectiveness and efficiency of this approach. The dosimetric indices of IMPT are compared with VMAT plan. Results: The PTV D95, lung V20, MLD, mean heart dose, esophagus D1, cord D1 are 70Gy, 31%, 17.8Gy, 25.5Gy, 73Gy, 45Gy for IMPT plan and 65.3Gy, 34%, 21.6Gy, 35Gy, 74Gy, 48Gy for VMAT plan. For majority cases, the high dose region of the normal tissue which is in proximity of PTV is comparable between IMPT and VMAT plan. The low dose region of the IMPT plan is significantly better than VMAT plan. Conclusion: Using the knowledge gained in VMAT plan design can help efficiently and effectively design high quality IMPT plan. The quality of IMPT plan can be controlled to ensure the superiority of IMPT plan compared to VMAT/IMRT plan.

  7. SU-E-T-43: A Methodology for Quality Control of IMPT Treatment Plan Based On VMAT Plan

    International Nuclear Information System (INIS)

    Jiang, S; Yang, Y; Liao, L; Wang, X; Li, H; Zhu, X; Zhang, X

    2015-01-01

    Purpose: IMPT plan design is highly dependent on planner’s experiences. VMAT plan design is relatively mature and can even be automated. The quality of IMPT plan designed by in-experienced planner could be inferior to that of VMAT plan designed by experienced planner or automatic planning software. Here we introduce a method for designing IMPT plan based on VMAT plan to ensure the IMPT plan be superior to IMRT/VMAT plan for majority clinical scenario. Methods: To design a new IMPT plan, a VMAT plan is first generated either by experienced planner or by in-house developed automatic planning system. An in-house developed tool is used to generate the dose volume constrains for the IMPT plan as plan template to Eclipse TPS. The beam angles for IMPT plan are selected based on the preferred angles in the VMAT plan. IMPT plan is designed by importing the plan objectives generated from VMAT plan. Majority thoracic IMPT plans are designed using this plan approach in our center. In this work, a thoracic IMPT plan under RTOG 1308 protocol is selected to demonstrate the effectiveness and efficiency of this approach. The dosimetric indices of IMPT are compared with VMAT plan. Results: The PTV D95, lung V20, MLD, mean heart dose, esophagus D1, cord D1 are 70Gy, 31%, 17.8Gy, 25.5Gy, 73Gy, 45Gy for IMPT plan and 65.3Gy, 34%, 21.6Gy, 35Gy, 74Gy, 48Gy for VMAT plan. For majority cases, the high dose region of the normal tissue which is in proximity of PTV is comparable between IMPT and VMAT plan. The low dose region of the IMPT plan is significantly better than VMAT plan. Conclusion: Using the knowledge gained in VMAT plan design can help efficiently and effectively design high quality IMPT plan. The quality of IMPT plan can be controlled to ensure the superiority of IMPT plan compared to VMAT/IMRT plan

  8. Radiolytic gas generation in Salt Cake Quality Assurance Plan

    International Nuclear Information System (INIS)

    Walker, D.D.

    1993-01-01

    High-level radioactive wastes are stored in large, steel tanks in the Savannah River Site's Tank Farms. The liquid levels in these tanks are monitored to detect leakage of waste out of tanks or leakage of liquids into the tanks. Recent unexplained level fluctuations in high-level waste (HLW) tanks have caused High Level Waste Engineering (HLWE) to develop a program to better understand tank level behavioral Interim Waste Technology (IWT) has been requested by HLWE to obtain data which will lead to a better understanding of the radiolytic generation of gases in salt cake. A task plan has been written in response to this request. This document details the controls necessary to ensure the quality of the results of the activities described in the task plan

  9. 23 CFR Appendix A to Part 450 - Linking the Transportation Planning and NEPA Processes

    Science.gov (United States)

    2010-04-01

    ... quality, and biology). Senior managers at transportation and partner agencies can arrange a variety of... strengthened link of the transportation planning and NEPA processes. Formal and informal mentoring on an intra...

  10. A semi-automated tool for treatment plan-quality evaluation and clinical trial quality assurance

    Science.gov (United States)

    Wang, Jiazhou; Chen, Wenzhou; Studenski, Matthew; Cui, Yunfeng; Lee, Andrew J.; Xiao, Ying

    2013-07-01

    The goal of this work is to develop a plan-quality evaluation program for clinical routine and multi-institutional clinical trials so that the overall evaluation efficiency is improved. In multi-institutional clinical trials evaluating the plan quality is a time-consuming and labor-intensive process. In this note, we present a semi-automated plan-quality evaluation program which combines MIMVista, Java/MATLAB, and extensible markup language (XML). More specifically, MIMVista is used for data visualization; Java and its powerful function library are implemented for calculating dosimetry parameters; and to improve the clarity of the index definitions, XML is applied. The accuracy and the efficiency of the program were evaluated by comparing the results of the program with the manually recorded results in two RTOG trials. A slight difference of about 0.2% in volume or 0.6 Gy in dose between the semi-automated program and manual recording was observed. According to the criteria of indices, there are minimal differences between the two methods. The evaluation time is reduced from 10-20 min to 2 min by applying the semi-automated plan-quality evaluation program.

  11. A semi-automated tool for treatment plan-quality evaluation and clinical trial quality assurance

    International Nuclear Information System (INIS)

    Wang, Jiazhou; Chen, Wenzhou; Studenski, Matthew; Cui, Yunfeng; Xiao, Ying; Lee, Andrew J

    2013-01-01

    The goal of this work is to develop a plan-quality evaluation program for clinical routine and multi-institutional clinical trials so that the overall evaluation efficiency is improved. In multi-institutional clinical trials evaluating the plan quality is a time-consuming and labor-intensive process. In this note, we present a semi-automated plan-quality evaluation program which combines MIMVista, Java/MATLAB, and extensible markup language (XML). More specifically, MIMVista is used for data visualization; Java and its powerful function library are implemented for calculating dosimetry parameters; and to improve the clarity of the index definitions, XML is applied. The accuracy and the efficiency of the program were evaluated by comparing the results of the program with the manually recorded results in two RTOG trials. A slight difference of about 0.2% in volume or 0.6 Gy in dose between the semi-automated program and manual recording was observed. According to the criteria of indices, there are minimal differences between the two methods. The evaluation time is reduced from 10–20 min to 2 min by applying the semi-automated plan-quality evaluation program. (note)

  12. Guidelines for quality assurance and quality control of fish taxonomic data collected as part of the National Water-Quality Assessment Program

    Science.gov (United States)

    Walsh, Stephen Joseph; Meador, Michael R.

    1998-01-01

    Fish community structure is characterized by the U.S. Geological Survey's National Water-Quality Assessment (NAWQA) Program as part of a perennial, multidisciplinary approach to evaluating the physical, chemical, and biological conditions of the Nation's water resources. The objective of quality assurance and quality control of fish taxonomic data that are collected as part of the NAWQA Program is to establish uniform guidelines and protocols for the identification, processing, and archiving of fish specimens to ensure that accurate and reliable data are collected. Study unit biologists, collaborating with regional biologists and fish taxonomic specialists, prepare a pre-sampling study plan that includes a preliminary faunal list and identification of an ichthyological curation center for receiving preserved fish specimens. Problematic taxonomic issues and protected taxa also are identified in the study plan, and collecting permits are obtained in advance of sampling activities. Taxonomic specialists are selected to identify fish specimens in the field and to assist in determining what fish specimens should be sacrificed, fixed, and preserved for laboratory identification, independent taxonomic verification, and long-term storage in reference or voucher collections. Quantitative and qualitative sampling of fishes follows standard methods previously established for the NAWQA Program. Common ichthyological techniques are used to process samples in the field and prepare fish specimens to be returned to the laboratory or sent to an institutional repository. Taxonomic identifications are reported by using a standardized list of scientific names that provides nomenclatural consistency and uniformity across study units.

  13. 42 CFR 460.132 - Quality assessment and performance improvement plan.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 4 2010-10-01 2010-10-01 false Quality assessment and performance improvement plan... assessment and performance improvement plan. (a) Basic rule. A PACE organization must have a written quality assessment and performance improvement plan. (b) Annual review. The PACE governing body must review the plan...

  14. Can health feasibly be considered as part of the planning process in Scotland?

    International Nuclear Information System (INIS)

    Higgins, Martin; Douglas, Margaret; Muirie, Jill

    2005-01-01

    The planning system is significant because of its capacity to determine the quality of the built environment as well as the health, well-being and quality of life of the individuals and communities therein. Development planning is especially important because of the long-term impact of the decisions. This paper was developed in response to increasing recognition amongst HIA practitioners in Scotland of the importance of planning for health. It focuses on the relationship between the planning system in Scotland, specifically the Development Planning element of it, and population health and considers how the health impact assessment (HIA) approach can facilitate and support joint working with planners. In particular, consideration is given to the potential impact of the introduction of Strategic Environmental Assessment (SEA) on the linkages between health, HIA and planning

  15. 40 CFR 35.925-2 - Water quality management plans and agencies.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Water quality management plans and... Water Act § 35.925-2 Water quality management plans and agencies. That the project is consistent with any applicable water quality management (WQM) plan approved under section 208 or section 303(e) of the...

  16. Quality Assurance Program Plan for the Environmental Restoration Program

    International Nuclear Information System (INIS)

    1992-01-01

    The United States Department of Energy (USDOE) has initiated the Environmental Restoration Program (ERP) in an effort to manage, control and remediate existing hazardous, toxic and radioactive wastes generated at the Portsmouth Gaseous Diffusion Plant (PORTS). This ERP Quality Assurance Program Plan (QAPP) is responsive to the PORTS ESH Division QAPP and the ES Environmental Restoration Division (ERD) QAPP. This QAPP establishes the policies, requirements and responsibilities by which an appropriate level of QA shall be implemented within the PORTS-ERP. All PORTS-ERP activities shall be conducted in accordance with the requirements of this document and/or of a project level document which is derivative of this document

  17. Additive Manufacturing: Multi Material Processing and Part Quality Control

    DEFF Research Database (Denmark)

    Pedersen, David Bue

    This Ph.D dissertation,ffAdditive Manufacturing: Multi Material Processing and Part Quality Controlff, deal with Additive Manufacturing technologies which is a common name for a series of processes that are recognized by being computer controlled, highly automated, and manufacture objects...... by a layered deposition of material. Two areas of particular interest is addressed. They are rooted in two very different areas, yet is intended to fuel the same goal. To help Additive Manufacturing technologies one step closer to becoming the autonomous, digital manufacturing method of tomorrow. Vision...... systems A paradox exist in the field of Additive Manufacturing. The technologies allow for close-to unrestrained and integral geometrical freedom. Almost any geometry can be manufactured fast, e"ciently and cheap. Something that has been missing fundamental capability since the entering of the industrial...

  18. Quality Assurance Program Plan for SFR Metallic Fuel Data Qualification

    Energy Technology Data Exchange (ETDEWEB)

    Benoit, Timothy [Argonne National Lab. (ANL), Argonne, IL (United States). Nuclear Engineering Division; Hlotke, John Daniel [Argonne National Lab. (ANL), Argonne, IL (United States). Nuclear Engineering Division; Yacout, Abdellatif [Argonne National Lab. (ANL), Argonne, IL (United States). Nuclear Engineering Division

    2017-07-05

    This document contains an evaluation of the applicability of the current Quality Assurance Standards from the American Society of Mechanical Engineers Standard NQA-1 (NQA-1) criteria and identifies and describes the quality assurance process(es) by which attributes of historical, analytical, and other data associated with sodium-cooled fast reactor [SFR] metallic fuel and/or related reactor fuel designs and constituency will be evaluated. This process is being instituted to facilitate validation of data to the extent that such data may be used to support future licensing efforts associated with advanced reactor designs. The initial data to be evaluated under this program were generated during the US Integral Fast Reactor program between 1984-1994, where the data includes, but is not limited to, research and development data and associated documents, test plans and associated protocols, operations and test data, technical reports, and information associated with past United States Nuclear Regulatory Commission reviews of SFR designs.

  19. The CHPRC Columbia River Protection Project Quality Assurance Project Plan

    Energy Technology Data Exchange (ETDEWEB)

    Fix, N. J.

    2008-11-30

    Pacific Northwest National Laboratory researchers are working on the CHPRC Columbia River Protection Project (hereafter referred to as the Columbia River Project). This is a follow-on project, funded by CH2M Hill Plateau Remediation Company, LLC (CHPRC), to the Fluor Hanford, Inc. Columbia River Protection Project. The work scope consists of a number of CHPRC funded, related projects that are managed under a master project (project number 55109). All contract releases associated with the Fluor Hanford Columbia River Project (Fluor Hanford, Inc. Contract 27647) and the CHPRC Columbia River Project (Contract 36402) will be collected under this master project. Each project within the master project is authorized by a CHPRC contract release that contains the project-specific statement of work. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the Columbia River Project staff.

  20. The CHPRC Columbia River Protection Project Quality Assurance Project Plan

    International Nuclear Information System (INIS)

    Fix, N.J.

    2008-01-01

    Pacific Northwest National Laboratory researchers are working on the CHPRC Columbia River Protection Project (hereafter referred to as the Columbia River Project). This is a follow-on project, funded by CH2M Hill Plateau Remediation Company, LLC (CHPRC), to the Fluor Hanford, Inc. Columbia River Protection Project. The work scope consists of a number of CHPRC funded, related projects that are managed under a master project (project number 55109). All contract releases associated with the Fluor Hanford Columbia River Project (Fluor Hanford, Inc. Contract 27647) and the CHPRC Columbia River Project (Contract 36402) will be collected under this master project. Each project within the master project is authorized by a CHPRC contract release that contains the project-specific statement of work. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the Columbia River Project staff

  1. Use of quality planning methods in optimizing welding wire quality characteristics

    Directory of Open Access Journals (Sweden)

    D. Vykydal

    2013-10-01

    Full Text Available The quality of a product is given by the extent, to which the product meets customer requirements. It is generally accepted that the extent, to which the product meets such customer requirements, and, consequently, the resulting quality of the product itself, substantially depend on the early stages of the product lifecycle, i.e. on the design and development stages. Appropriate means for effective product quality planning can be found among quality management methods and tools. These methods are typically employed in engineering production and automotive industry. This paper focuses on exploring the potential of Quality Function Deployment (QFD and Failure Mode and Effect Analysis (FMEA methods for use in metallurgical production, an industrial branch where they have not been commonly employed as yet.

  2. Recursive estimation of the parts production process quality indicator

    Directory of Open Access Journals (Sweden)

    Filipovich Oleg

    2017-01-01

    Full Text Available Consideration is given to a mathematical representation for manufacturing of batch parts on a metal-cutting machine tool. Linear dimensions of machined parts are assumed to be the major quality indicator, deviation from these dimensions is determined by size setting of machine tool and ensemble of random factors. It is allowed to have absolutely precise pre-setting of machine tool, effects from setup level offsetting due to deformation in process equipment on the specified indicator are disregarded. Consideration is given to factors which affect the tool wear, with two definitions of tool wear being provided. Reasons for development of random error in processing, dependence of measurement results on error as well as distribution laws and some parameters of random values are provided. To evaluate deviation of size setting value in each cycle, it is proposed to apply a recursive algorithm in description of investigated dynamic discrete process in the space state. Kalman filter equations are used in description of process model by means of first-order difference equations. The algorithm of recursive estimation is implemented in the mathematical software Maple. Simulation results which prove effectiveness of algorithm application to investigate the given dynamic system are provided. Variants of algorithm application and opportunities of further research are proposed.

  3. An expert system for process planning of sheet metal parts produced ...

    Indian Academy of Sciences (India)

    Sachin Salunkhe

    set of production rules and frames for process planning of axisymmetric deep ... parameters for design of stamping die for manufacturing of circular cup with ..... proper sequence of operations to manufacture sheet metal part correctly and ...

  4. Using historical crash data as part of traffic work zone safety planning and project management strategies.

    Science.gov (United States)

    2014-07-01

    This funding enabled the project entitled, USING HISTORICAL CRASH DATA AS PART OF TRAFFIC WORK ZONE SAFETY : PLANNING AND PROJECT MANAGEMENT STRATEGIES to address the following: : Evaluate current organizational strategies with respect to w...

  5. Groups as a part of integrated treatment plans : Inpatient psychotherapy for outpatients?

    NARCIS (Netherlands)

    Staats, H

    2005-01-01

    Group psychotherapy in Germany is well established as part of an integrative treatment plan in inpatient treatment. Outpatient group psychotherapy, however, is conceptualized as a separate treatment option in competition with individual therapy. German guidelines for outpatient psychotherapy exclude

  6. Air quality management: challenges and solutions in delivering air quality action plans

    Energy Technology Data Exchange (ETDEWEB)

    Beattie, C.I.; Longhurst, J.W.S.; Woodfield, N.K.

    2000-07-01

    The Air Quality Strategy for England, Scotland, Wales and Northern Ireland (DETR, 2001) has the aim of showing how improved local air quality in the UK may be delivered. Through a process of reviewing and assessing local air quality in both urban and rural localities, a clear picture is emerging of areas of the UK where air quality objectives are not likely to be met. The next challenge will be the identification of the required actions and new ways of working to achieve specific air quality objectives. The declaration of air quality management areas, where objectives are not predicted to be met by their target years, involves co-ordinated local action and collaborative working, which can only be effective with support across local authority departments and external stake holders. This paper provides a background to the relevant legislation underpinning, local air quality management and summarises the review and assessment process. It then comments on future directions in relation to the designation of Air Quality Management Areas and considers the requirements of action plans to deliver the goal of cleaner air in the UK. It is concluded that the UK has developed a highly sophisticated system of air quality management over a relatively short period of time, and with it has brought a new way of local authority working. The challenge of the next stage of the process is likely to be in implementing cost effective and proportional solutions to identified problems at the local level. (Author)

  7. Patient-specific dosimetric endpoints based treatment plan quality control in radiotherapy

    International Nuclear Information System (INIS)

    Song, Ting; Zhou, Linghong; Staub, David; Chen, Mingli; Lu, Weiguo; Tian, Zhen; Jia, Xun; Li, Yongbao; Jiang, Steve B; Gu, Xuejun

    2015-01-01

    In intensity modulated radiotherapy (IMRT), the optimal plan for each patient is specific due to unique patient anatomy. To achieve such a plan, patient-specific dosimetric goals reflecting each patient’s unique anatomy should be defined and adopted in the treatment planning procedure for plan quality control. This study is to develop such a personalized treatment plan quality control tool by predicting patient-specific dosimetric endpoints (DEs). The incorporation of patient specific DEs is realized by a multi-OAR geometry-dosimetry model, capable of predicting optimal DEs based on the individual patient’s geometry. The overall quality of a treatment plan is then judged with a numerical treatment plan quality indicator and characterized as optimal or suboptimal. Taking advantage of clinically available prostate volumetric modulated arc therapy (VMAT) treatment plans, we built and evaluated our proposed plan quality control tool. Using our developed tool, six of twenty evaluated plans were identified as sub-optimal plans. After plan re-optimization, these suboptimal plans achieved better OAR dose sparing without sacrificing the PTV coverage, and the dosimetric endpoints of the re-optimized plans agreed well with the model predicted values, which validate the predictability of the proposed tool. In conclusion, the developed tool is able to accurately predict optimally achievable DEs of multiple OARs, identify suboptimal plans, and guide plan optimization. It is a useful tool for achieving patient-specific treatment plan quality control. (paper)

  8. The motion planning problem and exponential stabilization of a heavy chain. Part II

    OpenAIRE

    Piotr Grabowski

    2008-01-01

    This is the second part of paper [P. Grabowski, The motion planning problem and exponential stabilization of a heavy chain. Part I, to appear in International Journal of Control], where a model of a heavy chain system with a punctual load (tip mass) in the form of a system of partial differential equations was interpreted as an abstract semigroup system and then analysed on a Hilbert state space. In particular, in [P. Grabowski, The motion planning problem and exponential stabilization of a h...

  9. An expert system for process planning of sheet metal parts produced

    Indian Academy of Sciences (India)

    Process planning of sheet metal part is an important activity in the design of compound die. Traditional methods of carrying out this task are manual, tedious, time-consuming, error-prone and experiencebased. This paper describes the research work involved in the development of an expert system for process planning of ...

  10. China's women leaders promote quality and equity in family planning.

    Science.gov (United States)

    He, S

    1995-08-01

    In China, key policy-makers at the highest levels of government recognize that the success of the family planning (FP) program depends upon improving the status of Chinese women. The highest ranking female government official, Peng Peiyun, a State Councilor and the Minister of the State Family Planning (FP) Commission, has initiated a new policy of improving the quality of service in the FP program. She recognizes that women who are gainfully employed and control their income are less likely to desire large families. One aspect of the effort to improve quality involves training FP personnel in interpersonal communication and counseling skills. The results of a pilot training program show that clients are pleased with the new approach and that use of FP services has increased. The FP Commission is also experimenting with programs which integrate all the needs of women and their families (FP, credit availability, old age support) in rural areas. Traditionally, sons provided for their elderly parents, so families with only one daughter are concerned about old age provision. Thus, national efforts are underway to develop social security systems. In the meantime, women at all levels, from grassroots FP acceptors to FP staff members and researchers are the major contributors to the innovations which will allow China to control its population growth.

  11. Integrated energy, air quality and greenhouse gas management plan

    International Nuclear Information System (INIS)

    2004-03-01

    This report outlines the measures that the Resort Municipality of Whistler has taken to become a sustainable community. In 2000, the Municipality adopted the Natural Step, a tool developed by international scientists to integrate ecological principles into the practices of communities, organizations and individuals. In 2001, the Municipality adopted a comprehensive sustainability plan. This report describes the efforts to manage energy, air quality, and greenhouse gases (GHG). More than 90 per cent of the common air contaminants that contribute to air quality problems in Whistler come from the combustion of fossil fuels. The community can reduce emissions of carbon monoxide, oxides of nitrogen, oxides of sulphur, volatile organic compounds, and particulate matter by managing energy and GHG emissions. This report is divided into several sections dealing with corporate and community energy use. It presents a community profile for Whistler, its energy and emissions inventory from 2000, and an integrated energy plan. An energy and emissions forecast for 2000 to 2020 was also included along with an implementation strategy for a sustainable energy future for Whistler. refs., tabs., figs

  12. Research Quality Assessment and Planning Journals. The Italian Perspective.

    Directory of Open Access Journals (Sweden)

    Bruno Zanon

    2014-02-01

    Full Text Available Assessment of research products is a crucial issue for universities and research institutions faced with internationalization and competition. Disciplines are reacting differently to this challenge, and planning, in its various forms – from urban design to process­oriented sectors – is under strain because the increasingly common assessment procedures based on the number of articles published in ranked journals and on citation data are not generally accepted. The reputation of journals, the impact of publications, and the profiles of scholars are increasingly defined by means of indexes such as impact factor and citations counts, but these metrics are questioned because they do not take account of all journals and magazines – in particular those published in languages other than English – and they do not consider teaching and other activities typical of academics and which have a real impact on planning practices at the local level. In Italy the discussion is particularly heated because assessment procedures are recent, the disciplinary community is not used to publishing in ranked international journals, and the Italian literature is not attuned to the international quality criteria. The paper reviews the recent debate on planning journals and research assessment. It focuses on the Italian case from the perspective of improving current practices.

  13. 77 FR 2469 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Science.gov (United States)

    2012-01-18

    ... the California State Implementation Plan, Antelope Valley Air Quality Management District and Imperial... Quality Management District (AVAQMD) and Imperial County Air Pollution Control District (ICAPCD) portions... Technology (RACT),'' adopted on February 23, 2010. * * * * * (G) Antelope Valley Air Quality Management...

  14. 75 FR 61367 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2010-10-05

    ... the California State Implementation Plan, South Coast Air Quality Management District AGENCY... the South Coast Air Quality Management District (SCAQMD) portion of the California State... Measure for Architectural Coatings,'' CARB, October 2007. 4. ``Improving Air Quality with Economic...

  15. 77 FR 65133 - Revisions to the California State Implementation Plan, Mojave Desert Air Quality Management District

    Science.gov (United States)

    2012-10-25

    ... the California State Implementation Plan, Mojave Desert Air Quality Management District AGENCY... limited disapproval of revisions to the Mojave Desert Air Quality Management District (MDAQMD) portion of.... * * * * * (c) * * * (379) * * * (i) * * * (E) Mojave Desert Air Quality Management District. (1) Rule 1159...

  16. 78 FR 21582 - Revisions to the California State Implementation Plan, Butte County Air Quality Management...

    Science.gov (United States)

    2013-04-11

    ... the California State Implementation Plan, Butte County Air Quality Management District and Sacramento Metropolitan Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve revisions to the Butte County Air Quality Management...

  17. 76 FR 70888 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2011-11-16

    ... the California State Implementation Plan, South Coast Air Quality Management District AGENCY... the South Coast Air Quality Management District (SCAQMD) portion of the California State... Quality Management District--SCAQMD) (1) Rule 1143, ``Consumer Paint Thinners & Multi-purpose Solvents...

  18. 77 FR 66780 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2012-11-07

    ... the California State Implementation Plan, South Coast Air Quality Management District AGENCY... the South Coast Air Quality Management District (SCAQMD) portion of the California State... Control Measure for Architectural Coatings,'' CARB, October 2007. 4. ``Improving Air Quality with Economic...

  19. 77 FR 12526 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Science.gov (United States)

    2012-03-01

    ... the California State Implementation Plan, Antelope Valley Air Quality Management District and Mojave Desert Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve revisions to the Antelope Valley Air Quality Management District...

  20. 78 FR 45114 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Science.gov (United States)

    2013-07-26

    ... the California State Implementation Plan, Antelope Valley Air Quality Management District AGENCY... the Antelope Valley Air Quality Management District (AVAQMD) portion of the California State... for the South Coast Air Quality Management District (SCAQMD). The Antelope Valley Air Pollution...

  1. 75 FR 40762 - Revisions to the California State Implementation Plan, Sacramento Metropolitan Air Quality...

    Science.gov (United States)

    2010-07-14

    ... the California State Implementation Plan, Sacramento Metropolitan Air Quality Management District and South Coast Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve revisions to the Sacramento Metropolitan Air Quality...

  2. Quality Assurance Program Plan for the Waste Isolation Pilot Plant Experimental-Waste Characterization Program

    International Nuclear Information System (INIS)

    1991-01-01

    This Quality Assurance Program Plan (QAPP) identifies the quality of data necessary to meet the specific objectives associated with the Department of Energy (DOE) Waste Isolation Pilot Plant (WIPP) Experimental-Waste Characterization Program (the Program). This experimental-waste characterization program is only one part of the WIPP Test Phase, both in the short- and long-term, to quantify and evaluate the characteristics and behavior of transuranic (TRU) wastes in the repository environment. Other parts include the bin-scale and alcove tests, drum-scale tests, and laboratory experiments. In simplified terms, the purpose of the Program is to provide chemical, physical, and radiochemical data describing the characteristics of the wastes that will be emplaced in the WIPP, while the remaining WIPP Test Phase is directed at examining the behavior of these wastes in the repository environment. 50 refs., 35 figs., 33 tabs

  3. Improving Access to Quality Care in Family Planning: WHO's Four Cornerstones of Evidence-based Guidance

    Institute of Scientific and Technical Information of China (English)

    Shang-chun WU; Yan ZOU; K Church; O Meirik

    2007-01-01

    The four cornerstones of guidance in technique service of family planning are established by WHO based on high quality evidences. They have been updated according to the appearing new evidences, and the consensuses were reached by the international experts in this field. The four documents include Medical Eligibility Criteria for Contraceptive Use, Selected Practice Recommendations for Contraceptive Use, Decision-making Tool for Family Planning Clients and Providers and The Global Handbook for Family Planning Providers. The first two documents mainlyface to the policy-makers and programme managers and were treated as the important references for creating the local guideline. The other two documents were developed for the front-line health-care and family planning providers at different levels, which include plenty of essential technical information to help providers improve their ability in service delivery and counselling. China paid great attention to the introduction and application of WHO guidelines. As soon as the newer editions of these documents were available, the Chinese version would be followed. WHO guidelines have been primarily adapted with the newly issued national guideline, The Clinical Practical Skill Guidelines- Family Planning Part, which was established by China Medical Association. At the same time, the WHO guidelines have been introduced to some of the linicians and family planning providers at different levels. In the future, more special training courses will be introduced to the township level based on the needs of grassroot providers.

  4. Topological clustering as a tool for planning water quality monitoring in water distribution networks

    DEFF Research Database (Denmark)

    Kirstein, Jonas Kjeld; Albrechtsen, Hans-Jørgen; Rygaard, Martin

    2015-01-01

    ) identify steady clusters for a part of the network where an actual contamination has occurred; (2) analyze this event by the use of mesh diagrams; and (3) analyze the use of mesh diagrams as a decision support tool for planning water quality monitoring. Initially, the network model was divided...... into strongly and weakly connected clusters for selected time periods and mesh diagrams were used for analysing cluster connections in the Nørrebro district. Here, areas of particular interest for water quality monitoring were identified by including user-information about consumption rates and consumers...... particular sensitive towards water quality deterioration. The analysis revealed sampling locations within steady clusters, which increased samples' comparability over time. Furthermore, the method provided a simplified overview of water movement in complex distribution networks, and could assist...

  5. NAGC Pre-K-Grade 12 Gifted Education Programming Standards: A Guide to Planning and Implementing High-Quality Services

    Science.gov (United States)

    Johnsen, Susan K., Ed.

    2012-01-01

    The new Pre-K-Grade 12 Gifted Education Programming Standards should be part of every school district's repertoire of standards to ensure that the learning needs of advanced students are being met. "NAGC Pre-K-Grade 12 Gifted Education Programming Standards: A Guide to Planning and Implementing High-Quality Services" details six standards that…

  6. Fuels planning: science synthesis and integration; social issues fact sheet 13: Strategies for managing fuels and visual quality

    Science.gov (United States)

    Christine Esposito

    2006-01-01

    The public's acceptance of forest management practices, including fuels reduction, is heavily based on how forests look. Fuels managers can improve their chances of success by considering aesthetics when making management decisions. This fact sheet reviews a three-part general strategy for managing fuels and visual quality: planning, implementation, and monitoring...

  7. Fuels and fire in land-management planning. Part 1. Forest-fuel classification.

    Science.gov (United States)

    Wayne G. Maxwell; Franklin R. Ward

    1981-01-01

    This report describes a way to collect and classify the total fuel complex within a planning area. The information can be used as input for appraising and rating probable fire behavior and calculating expected costs and losses from various land uses and management alternatives, reported separately as Part 2 and Part 3 of this series. This total package can be used...

  8. Integrated service engineers and spare parts planning in the maintenance logistics

    NARCIS (Netherlands)

    Al Hanbali, Ahmad; Zijm, Willem H.M.

    2016-01-01

    We analyze the integrated tactical capacity planning of spare parts supply and workforce allocation in maintenance logistics of advanced equipment. The equipment time-to-failure, spare parts replenishment time, and equipment repair time are random and independent of each other.

  9. Part 1: Leadership's Influence on Corporate Entrepreneurship in Indian Textile Firms Part 2: Business Plan: Karma Ltd.

    OpenAIRE

    Muthe, Anshul

    2011-01-01

    As part of my dissertation, i created a business plan for an Indian Textile company to establish its own brand in the Indian market. The current booming economy and increase in purchasing power provides an ideal opportunity for Karma ltd. to establish itself. Second i focused on leadership styles and its influence on corporporate entrepreneuership. The research was based in India and provided great insights on leadership and corporate entreprenuership constructs.

  10. Quality Assurance Program Plan (QAPP) Waste Management Project

    Energy Technology Data Exchange (ETDEWEB)

    VOLKMAN, D.D.

    1999-10-27

    This document is the Quality Assurance Program Plan (QAPP) for Waste Management Federal Services of Hanford, Inc. (WMH), that implements the requirements of the Project Hanford Management Contract (PHMC), HNF-MP-599, Project Hanford Quality Assurance Program Description (QAPD) document, and the Hanford Federal Facility Agreement with Consent Order (Tri-Party Agreement), Sections 6.5 and 7.8. WHM is responsible for the treatment, storage, and disposal of liquid and solid wastes generated at the Hanford Site as well as those wastes received from other US Department of Energy (DOE) and non-DOE sites. WMH operations include the Low-Level Burial Grounds, Central Waste Complex (a mixed-waste storage complex), a nonradioactive dangerous waste storage facility, the Transuranic Storage Facility, T Plant, Waste Receiving and Processing Facility, 200 Area Liquid Effluent Facility, 200 Area Treated Effluent Disposal Facility, the Liquid Effluent Retention Facility, the 242-A Evaporator, 300 Area Treatment Effluent Disposal Facility, the 340 Facility (a radioactive liquid waste handling facility), 222-S Laboratory, the Waste Sampling and Characterization Facility, and the Hanford TRU Waste Program.

  11. Phase 2 sampling and analysis plan, Quality Assurance Project Plan, and environmental health and safety plan for the Clinch River Remedial Investigation: An addendum to the Clinch River RCRA Facility Investigation plan

    Energy Technology Data Exchange (ETDEWEB)

    Cook, R.B.; Adams, S.M.; Beauchamp, J.J.; Bevelhimer, M.S.; Blaylock, B.G.; Brandt, C.C.; Etnier, E.L.; Ford, C.J.; Frank, M.L.; Gentry, M.J.; Greeley, M.S.; Halbrook, R.S.; Harris, R.A.; Holladay, S.K.; Hook, L.A.; Howell, P.L.; Kszos, L.A.; Levine, D.A.; Skiles, J.L.; Suter, G.W.

    1992-12-01

    This document contains a three-part addendum to the Clinch River Resource Conservation and Recovery Act (RCRA) Facility Investigation Plan. The Clinch River RCRA Facility Investigation began in 1989, as part of the comprehensive remediation of facilities on the US Department of Energy Oak Ridge Reservation (ORR). The ORR was added to the National Priorities List in December 1989. The regulatory agencies have encouraged the adoption of Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) terminology; therefore, the Clinch River activity is now referred to as the Clinch River Remedial Investigation (CRRI), not the Clinch River RCRA Facility Investigation. Part 1 of this document is the plan for sampling and analysis (S A) during Phase 2 of the CRRI. Part 2 is a revision of the Quality Assurance Project Plan for the CRRI, and Part 3 is a revision of the Environmental Health and Safety Plan for the CRRI. The Clinch River RI (CRRI) is designed to address the transport, fate, and distribution of waterborne contaminants (radionuclides, metals, and organic compounds) released from the DOE Oak Ridge Reservation (ORR) and to assess potential risks to human health and the environment associated with these contaminants. Primary areas of investigation are Melton Hill Reservoir, the Clinch River from Melton Hill Dam to its confluence with the Tennessee River, Poplar Creek, and Watts Bar Reservoir. The contaminants identified in the Clinch River/Watts Bar Reservoir (CR/WBR) downstream of the ORR are those associated with the water, suspended particles, deposited sediments, aquatic organisms, and wildlife feeding on aquatic organisms. The purpose of the Phase 2 S A Plan is to describe the proposed tasks and subtasks developed to meet the primary objectives of the CRRI.

  12. Phase 2 sampling and analysis plan, Quality Assurance Project Plan, and environmental health and safety plan for the Clinch River Remedial Investigation: An addendum to the Clinch River RCRA Facility Investigation plan

    International Nuclear Information System (INIS)

    Cook, R.B.; Adams, S.M.; Beauchamp, J.J.; Bevelhimer, M.S.; Blaylock, B.G.; Brandt, C.C.; Etnier, E.L.; Ford, C.J.; Frank, M.L.; Gentry, M.J.; Greeley, M.S.; Halbrook, R.S.; Harris, R.A.; Holladay, S.K.; Hook, L.A.; Howell, P.L.; Kszos, L.A.; Levine, D.A.; Skiles, J.L.; Suter, G.W.

    1992-12-01

    This document contains a three-part addendum to the Clinch River Resource Conservation and Recovery Act (RCRA) Facility Investigation Plan. The Clinch River RCRA Facility Investigation began in 1989, as part of the comprehensive remediation of facilities on the US Department of Energy Oak Ridge Reservation (ORR). The ORR was added to the National Priorities List in December 1989. The regulatory agencies have encouraged the adoption of Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) terminology; therefore, the Clinch River activity is now referred to as the Clinch River Remedial Investigation (CRRI), not the Clinch River RCRA Facility Investigation. Part 1 of this document is the plan for sampling and analysis (S ampersand A) during Phase 2 of the CRRI. Part 2 is a revision of the Quality Assurance Project Plan for the CRRI, and Part 3 is a revision of the Environmental Health and Safety Plan for the CRRI. The Clinch River RI (CRRI) is designed to address the transport, fate, and distribution of waterborne contaminants (radionuclides, metals, and organic compounds) released from the DOE Oak Ridge Reservation (ORR) and to assess potential risks to human health and the environment associated with these contaminants. Primary areas of investigation are Melton Hill Reservoir, the Clinch River from Melton Hill Dam to its confluence with the Tennessee River, Poplar Creek, and Watts Bar Reservoir. The contaminants identified in the Clinch River/Watts Bar Reservoir (CR/WBR) downstream of the ORR are those associated with the water, suspended particles, deposited sediments, aquatic organisms, and wildlife feeding on aquatic organisms. The purpose of the Phase 2 S ampersand A Plan is to describe the proposed tasks and subtasks developed to meet the primary objectives of the CRRI

  13. A Comprehensive Comparison of IMRT and VMAT Plan Quality for Prostate Cancer Treatment

    International Nuclear Information System (INIS)

    Quan, Enzhuo M.; Li Xiaoqiang; Li Yupeng; Wang Xiaochun; Kudchadker, Rajat J.; Johnson, Jennifer L.; Kuban, Deborah A.; Lee, Andrew K.; Zhang Xiaodong

    2012-01-01

    Purpose: We performed a comprehensive comparative study of the plan quality between volumetric-modulated arc therapy (VMAT) and intensity-modulated radiation therapy (IMRT) for the treatment of prostate cancer. Methods and Materials: Eleven patients with prostate cancer treated at our institution were randomly selected for this study. For each patient, a VMAT plan and a series of IMRT plans using an increasing number of beams (8, 12, 16, 20, and 24 beams) were examined. All plans were generated using our in-house–developed automatic inverse planning (AIP) algorithm. An existing eight-beam clinical IMRT plan, which was used to treat the patient, was used as the reference plan. For each patient, all AIP-generated plans were optimized to achieve the same level of planning target volume (PTV) coverage as the reference plan. Plan quality was evaluated by measuring mean dose to and dose–volume statistics of the organs at risk, especially the rectum, from each type of plan. Results: For the same PTV coverage, the AIP-generated VMAT plans had significantly better plan quality in terms of rectum sparing than the eight-beam clinical and AIP-generated IMRT plans (p < 0.0001). However, the differences between the IMRT and VMAT plans in all the dosimetric indices decreased as the number of beams used in IMRT increased. IMRT plan quality was similar or superior to that of VMAT when the number of beams in IMRT was increased to a certain number, which ranged from 12 to 24 for the set of patients studied. The superior VMAT plan quality resulted in approximately 30% more monitor units than the eight-beam IMRT plans, but the delivery time was still less than 3 min. Conclusions: Considering the superior plan quality as well as the delivery efficiency of VMAT compared with that of IMRT, VMAT may be the preferred modality for treating prostate cancer.

  14. Quality-assurance plan and field methods for quality-of-water activities, U.S. Geological Survey, Idaho National Engineering Laboratory, Idaho

    International Nuclear Information System (INIS)

    Mann, L.J.

    1996-10-01

    Water-quality activities at the Idaho National Engineering Laboratory (INEL) Project Office are part of the US Geological Survey's (USGS) Water Resources Division (WRD) mission of appraising the quantity and quality of the Nation's water resources. The purpose of the Quality Assurance Plan (QAP) for water-quality activities performed by the INEL Project Office is to maintain and improve the quality of technical products, and to provide a formal standardization, documentation, and review of the activities that lead to these products. The principles of this plan are as follows: (1) water-quality programs will be planned in a competent manner and activities will be monitored for compliance with stated objectives and approaches; (2) field, laboratory, and office activities will be performed in a conscientious and professional manner in accordance with specified WRD practices and procedures by qualified and experienced employees who are well trained and supervised, if or when, WRD practices and procedures are inadequate, data will be collected in a manner that its quality will be documented; (3) all water-quality activities will be reviewed for completeness, reliability, credibility, and conformance to specified standards and guidelines; (4) a record of actions will be kept to document the activity and the assigned responsibility; (5) remedial action will be taken to correct activities that are deficient

  15. Implementation of imaging of the national protocol for quality control in planning systems

    International Nuclear Information System (INIS)

    Caudepon Moreno, F.; Martin-Viera cueto, J. A.; Bodineau gil, C.; Benitez Villegas, E. M.; Casado Villalon, F. J.; Moreno Sainz, C.

    2011-01-01

    Quality control of the planning system (SP) plays a key role in quality assurance schemes that include all stages of the radiotherapy process.In this work we focus on the evidence detailing the ''Protocol for quality control in therapy planning systems with ionizing radiation of the SEFM in ''anatomical data acquisition (DA).

  16. 78 FR 7703 - Revisions to the California State Implementation Plan, South Coast Air Quality Management...

    Science.gov (United States)

    2013-02-04

    ... the California State Implementation Plan, South Coast Air Quality Management District, Proposed Rule... approve a revision to the South Coast Air Quality Management District (SCAQMD) portion of the California... digesters. Rule 1127 was designed to implement the 2003 Air Quality Management Plan (AQMP) control measure...

  17. 76 FR 47094 - Revisions to the California State Implementation Plan; South Coast Air Quality Management District

    Science.gov (United States)

    2011-08-04

    ... the California State Implementation Plan; South Coast Air Quality Management District AGENCY... the South Coast Air Quality Management District portion of the California State Implementation Plan... following local rule: South Coast Air Quality Management District Rule 1175, Control of Emissions from the...

  18. 76 FR 30896 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2011-05-27

    ... the California State Implementation Plan, South Coast Air Quality Management District AGENCY... the South Coast Air Quality Management District (SCAQMD) portion of the California State... overwhelmingly formed as a secondary pollutant. (South Coast 2007 Air Quality Management Plan, page ES-9...

  19. Assessment of quality of care in family planning services in Jimma ...

    African Journals Online (AJOL)

    Background: Providing quality of care in family planning services is an important task for care providers so as to increase service utilization and coverage; however, little is known about the existing quality of care in such services. Objective: To assess quality of care in family planning services in Jimma Zone, southwest ...

  20. Nonradioactive Dangerous Waste Landfill sampling and analysis plan and data quality objectives process summary report

    International Nuclear Information System (INIS)

    Smith, R.C.

    1997-08-01

    This sampling and analysis plan defines the sampling and analytical activities and associated procedures that will be used to support the Nonradioactive Dangerous Waste Landfill soil-gas investigation. This SAP consists of three sections: this introduction, the field sampling plan, and the quality assurance project plan. The field sampling plan defines the sampling and analytical methodologies to be performed

  1. National Ignition Facility quality assurance plan for laser materials and optical technology

    Energy Technology Data Exchange (ETDEWEB)

    Wolfe, C.R.

    1996-05-01

    Quality achievement is the responsibility of the line organizations of the National Ignition Facility (NIF) Project. This subtier Quality Assurance Plan (QAP) applies to activities of the Laser Materials & Optical Technology (LM&OT) organization and its subcontractors. It responds to the NIF Quality Assurance Program Plan (QAPP, L-15958-2, NIF-95-499) and Department of Energy (DOE) Order 5700.6C. This Plan is organized according to 10 Quality Assurance (QA) criteria and subelements of a management system as outlined in the NIF QAPP. This Plan describes how those QA requirements are met. This Plan is authorized by the Associate Project Leader for the LM&OT organization, who has assigned responsibility to the Optics QA engineer to maintain this plan, with the assistance of the NIF QA organization. This Plan governs quality-affecting activities associated with: design; procurement; fabrication; testing and acceptance; handling and storage; and installation of NIF Project optical components into mounts and subassemblies.

  2. 76 FR 68381 - Approval and Promulgation of Air Quality Implementation Plans; Pennsylvania; Pennsylvania Clean...

    Science.gov (United States)

    2011-11-04

    ... Promulgation of Air Quality Implementation Plans; Pennsylvania; Pennsylvania Clean Vehicles Program AGENCY... Implementation Plan (SIP) revision submitted by the Commonwealth of Pennsylvania. This SIP revision contains Pennsylvania's Clean Vehicle Program, which adopts California's second generation low emission vehicle program...

  3. Final Hanford Site Transuranic (TRU) Waste Characterization Quality Assurance Project Plan

    International Nuclear Information System (INIS)

    GREAGER, T.M.

    1999-01-01

    The Transuranic Waste Characterization Quality Assurance Program Plan required each US Department of Energy (DOE) site that characterizes transuranic waste to be sent the Waste Isolation Pilot Plan that addresses applicable requirements specified in the QAPP

  4. SU-C-BRD-01: A Statistical Modeling Method for Quality Control of Intensity- Modulated Radiation Therapy Planning

    International Nuclear Information System (INIS)

    Gao, S; Meyer, R; Shi, L; D'Souza, W; Zhang, H

    2014-01-01

    Purpose: To apply a statistical modeling approach, threshold modeling (TM), for quality control of intensity-modulated radiation therapy (IMRT) treatment plans. Methods: A quantitative measure, which was the weighted sum of violations of dose/dose-volume constraints, was first developed to represent the quality of each IMRT plan. Threshold modeling approach, which is is an extension of extreme value theory in statistics and is an effect way to model extreme values, was then applied to analyze the quality of the plans summarized by our quantitative measures. Our approach modeled the plans generated by planners as a series of independent and identically distributed random variables and described the behaviors of them if the plan quality was controlled below certain threshold. We tested our approach with five locally advanced head and neck cancer patients retrospectively. Two statistics were incorporated for numerical analysis: probability of quality improvement (PQI) of the plans and expected amount of improvement on the quantitative measure (EQI). Results: After clinical planners generated 15 plans for each patient, we applied our approach to obtain the PQI and EQI as if planners would generate additional 15 plans. For two of the patients, the PQI was significantly higher than the other three (0.17 and 0.18 comparing to 0.08, 0.01 and 0.01). The actual percentage of the additional 15 plans that outperformed the best of initial 15 plans was 20% and 27% comparing to 11%, 0% and 0%. EQI for the two potential patients were 34.5 and 32.9 and the rest of three patients were 9.9, 1.4 and 6.6. The actual improvements obtained were 28.3 and 20.5 comparing to 6.2, 0 and 0. Conclusion: TM is capable of reliably identifying the potential quality improvement of IMRT plans. It provides clinicians an effective tool to assess the trade-off between extra planning effort and achievable plan quality. This work was supported in part by NIH/NCI grant CA130814

  5. Total quality management for addressing suspect parts at the Oak Ridge High Flux Isotope Reactor

    International Nuclear Information System (INIS)

    Hendrix, K.A.; Tulay, M.P.

    1993-01-01

    Martin Marietta Energy System (MMES) Research Reactors Division (RRD), operator of the High Flux Isotope Reactor (HFIR) recently embarked on an aggressive Program to address the issue of suspect Parts and to enhance their procurement process. Through the application of TQM process improvement, RRD has already achieved improved efficiency in specifying, procuring, and accepting replacement items for its largest research reactor. These process improvements have significantly decreased the risk of installing suspect parts in the HFIR safety systems. To date, a systematic plan has been implemented, which includes the following elements: Process assessment and procedure review; Procedural enhancements; On-site training and technology transfer; Enhanced receiving inspections; Performance supplier evaluations and source verifications integrated processes for utilizing commercial grade products in nuclear safety-related applications. This paper will describe the above elements, how a partnership between MMES and Gilbert/Commonwealth facilitated the execution of the plan, and how process enhancements were applied. We will also present measures for improved efficiency and productivity, that MMES intends to continually address with Quality Action Teams

  6. Improving the quality of manually acquired data: Applying the theory of planned behaviour to data quality

    International Nuclear Information System (INIS)

    Murphy, Glen D.

    2009-01-01

    The continued reliance of manual data capture in engineering asset intensive organisations highlights the critical role played by those responsible for recording raw data. The potential for data quality variance across individual operators also exposes the need to better manage this particular group. This paper evaluates the relative importance of the human factors associated with data quality. Using the theory of planned behaviour this paper considers the impact of attitudes, perceptions and behavioural intentions on the data collection process in an engineering asset context. Two additional variables are included, those of time pressure and operator feedback. Time pressure is argued to act as a moderator between intention and data collection behaviour, while perceived behavioural control will moderate the relationship between feedback and data collection behaviour. Overall the paper argues that the presence of best practice procedures or threats of disciplinary sanction are insufficient controls to determine data quality. Instead those concerned with improving the data collection performance of operators should consider the operator's perceptions of group attitude towards data quality, the level of feedback provided to data collectors and the impact of time pressures on procedure compliance. A range of practical recommendations are provided to those wishing to improve the quality of their manually acquired data.

  7. Quality control in health care: an experiment in radiotherapy planning for breast cancer patients after mastectomy

    International Nuclear Information System (INIS)

    Holli, Kaija; Laippala, Pekka; Ojala, Antti; Pitkaenen, Maunu

    1999-01-01

    Purpose: The importance of evaluating and improving quality in clinical practice is now generally acknowledged. In this study we estimated different sources of variation in radiotherapy planning for breast cancer patients after mastectomy and sought to test the applicability of a reproducibility and repeatability (R and R) study in a clinical context. Methods: Eleven radiation oncologists planned radiotherapy three times for three different kinds of breast cancer patients without knowing they were handling the same patient three times. Variation was divided into different components: physicians as operators, patients as parts, and repeated measurements as trials. Variation due to difference across trials (repeatability), that across the physicians (reproducibility), and that across the patients (variability) were estimated, as well as interactions between physicians and patients. Calculation was based on the sum of squares, and analysis was supported by various graphical presentations such as range charts and box plots. Results: Some parts of the planning process were characterized by higher and different kinds of variation than the others. Interphysician variation (i.e., reproducibility) was not high but there were some clearly outlying physicians. The highest variation was in repeatability (intraphysician variation). The major part of the variation was, however, that from patient to patient: 33% of the total in Parameter 1 and 85% of the total in Parameter 2. Conclusions: R and R studies are applicable and are needed to evaluate and improve quality in clinical practice. This kind of analysis provides opportunities to establish which kinds of patients require particularly careful attention, which points in the process are most critical for variation, which are the most difficult aspects for each physician and call for more careful description in documents, and which physicians need further training

  8. 77 FR 12673 - Approval of Air Quality Implementation Plans; California; South Coast; Attainment Plan for 1997 8...

    Science.gov (United States)

    2012-03-01

    ..., Douglas Ito, Chief, Air Quality and Transportation Planning Branch; California Air Resources Board... District determine compliance with the ``global commitment'' target, thus leaving them in a situation faced... plans, after consultation with the operators adopt ridership increase target for 1983-1987. Emission...

  9. Air quality plans unveiled at Toronto's first Smog Summit

    Energy Technology Data Exchange (ETDEWEB)

    Anon.

    2000-06-23

    New federal and provincial initiatives to improve air quality were announced at the recent first-ever Toronto Smog Summit. An initial one million dollars have been pledged by the federal Minister of the Environment to support a framework for extending daily air quality forecasting across Canada, to begin within the next year. The funding will be used to increase the information base of existing air quality advisory programs in Ontario, and to create a daily air quality index immediately in other areas of the country most affected by smog. Existing air quality assessment programs will be expanded to include air quality models incorporating measurement and reporting of particulate matter levels. A second federal initiative also announced at the is meeting will be a corporate smog action plan, led by the Ontario regional offices of the federal departments of the Environment, Health Canada, and Public Works and Government Services. This program will include rapid response by federal government departments during Smog Alerts Days and measures to reduce the federal government's contribution to causing smog through encouragement of low or no emission options for employees, educational programs on best practices at home and at the office, reduction of employee travel through flextime and telecommuting, conversion of government vehicles to natural gas and other alternatives, and retrofitting government buildings for greater energy and water efficiency. A federal commitment of at least $200,000 was also announced by the Minister of Transport to support six sustainable transportation projects. The provincial Minister of the Environment announced the membership of the province's Anti-Smog Action Plan, which involves some 50 partners from industry associations, companies, government agencies and non-government organizations to help Ontario to meet its commitment to reduces nitrogen oxides and volatile organic compounds emissions by 45 per cent by 2015. A strategy for

  10. Quality assessment of drinking water in Temeke District (part II ...

    African Journals Online (AJOL)

    Water quality studied includes pH, chloride, nitrate and total hardness levels. The concentrations of total hardness in mg CaCO3/L and chloride were obtained by titration method while the nitrate concentration levels were determined by spectrophotometer. Tap water was found to be of high quality than other sources in ...

  11. 40 CFR Appendix C to Part 61 - Quality Assurance Procedures

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 8 2010-07-01 2010-07-01 false Quality Assurance Procedures C Appendix...—Quality Assurance Procedures Procedure 1—Determination of Adequate Chromatographic Peak Resolution In this....” Procedure 2—Procedure for Field Auditing GC Analysis Responsibilities of audit supervisor and analyst at the...

  12. Quality of Service in Bluetooth networking - part I

    NARCIS (Netherlands)

    van der Zee, Martin; Heijenk, Geert

    The Quality of Service functions and procedures included in the Bluetooth 1.0 specification have been reviewed. Next issues associated with providing Quality of Service over a wireless link in general and Bluetooth in particular have been investigated. Allthough the Bluetooth 1.0 specification

  13. Quality improvement primer part 1: Preparing for a quality improvement project in the emergency department.

    Science.gov (United States)

    Chartier, Lucas B; Cheng, Amy H Y; Stang, Antonia S; Vaillancourt, Samuel

    2018-01-01

    Emergency medicine (EM) providers work in a fast-paced and often hectic environment that has a high risk for patient safety incidents and gaps in the quality of care. These challenges have resulted in opportunities for frontline EM providers to play a role in quality improvement (QI) projects. QI has developed into a mature field with methodologies that can dramatically improve the odds of having a successful project with a sustainable impact. However, this expertise is not yet commonly taught during professional training. In this first of three articles meant as a QI primer for EM clinicians, we will introduce QI methodology and strategic planning using a fictional case study as an example. We will review how to identify a QI problem, define components of an effective problem statement, and identify stakeholders and core change team members. We will also describe three techniques used to perform root cause analyses-Ishikawa diagrams, Pareto charts and process mapping-and how they relate to preparing for a QI project. The next two papers in this series will focus on the execution of the QI project itself using rapid-cycle testing and on the evaluation and sustainability of QI projects.

  14. 76 FR 40262 - Determination of Attainment, Approval and Promulgation of Air Quality Implementation Plans...

    Science.gov (United States)

    2011-07-08

    ... Ambient Air Quality Standard (NAAQS). This action corrects an omission in the regulatory text of the.... FOR FURTHER INFORMATION CONTACT: Edward Doty, Environmental Scientist, Attainment Planning and...

  15. Application of Data Quality Objectives in Decommissioning Plans

    International Nuclear Information System (INIS)

    Duvall, Ken

    2008-01-01

    The Data Quality Objectives (DQOs) are applicable and relevant in the design of measurements that provide data for good, effective decision-making. The DQOs provide criteria for the design of measurements and provide a target for assessing the level of data quality that is considered acceptable for effective decision-making. Such targets in the design of measurements help eliminate the acquisition of unnecessary, duplicative or overly precise data. They help provide more efficient use of limited measurement resources. With the application of DQOs, D and D program decisions are identified, DQOs are established, and measurements are designed to provide data that meet the DQOs for each decision point. Since the Historical Site Assessment (HSA), Scoping, Characterization, and Remedial Action Surveys provide data and information to all D and D program decision-making, an integrated approach should be taken where all input requirements are considered, in the design of each survey. The decision points and their linkages form a network of decisions referred to as a decision framework. Since distinct D and D program functions are linked by their decisions, programs proceed through the decision framework, in a uniform fashion, to one endpoint, the decision to release the site. The decision to release the site is based on the ability to pass the Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM). Therefore, D and D planning has a primary aim, to integrate D and D program efforts in a manner that will allow D and D decision-making to reach one end point, effective MARSSIM decision-making. The Decision Framework is best represented, schematically, by a decision tree. The decision tree is based on 3- decision points and represents a decision in each of the Remediation, Dose Assessment and MARSSIM program functions. The decisions address the extent of excavation, dose modeling approach, and sampling for the MARSSIM Final Status Survey (FSS). The simplified

  16. Leading quality through the development of a multi-year corporate quality plan: sharing The Ottawa Hospital experience.

    Science.gov (United States)

    Hunter, Linda; Myles, Joanne; Worthington, James R; Lebrun, Monique

    2011-01-01

    This article discusses the background and process for developing a multi-year corporate quality plan. The Ottawa Hospital's goal is to be a top 10% performer in quality and patient safety in North America. In order to create long-term measurable and sustainable changes in the quality of patient care, The Ottawa Hospital embarked on the development of a three-year strategic corporate quality plan. This was accomplished by engaging the organization at all levels and defining quality frameworks, aligning with internal and external expectations, prioritizing strategic goals, articulating performance measurements and reporting to stakeholders while maintaining a transparent communication process. The plan was developed through an iterative process that engaged a broad base of health professionals, physicians, support staff, administration and senior management. A literature review of quality frameworks was undertaken, a Quality Plan Working Group was established, 25 key stakeholder interviews were conducted and 48 clinical and support staff consultations were held. The intent was to gather information on current quality initiatives and challenges encountered and to prioritize corporate goals and then create the quality plan. Goals were created and then prioritized through an affinity exercise. Action plans were developed for each goal and included objectives, tasks and activities, performance measures (structure, process and outcome), accountabilities and timelines. This collaborative methodology resulted in the development of a three-year quality plan. Six corporate goals were outlined by the tenets of the quality framework for The Ottawa Hospital: access to care, appropriate care (effective and efficient), safe care and satisfaction with care. Each of the six corporate goals identified objectives and supporting action plans with accountabilities outlining what would be accomplished in years one, two and three. The three-year quality plan was approved by senior

  17. Quality Assurance program plan - plutonium stabilization and handling project W-460

    International Nuclear Information System (INIS)

    SCHULTZ, J.W.

    1999-01-01

    This Quality Assurance Program Plan (QAPP) identifies Project Quality Assurance (QA) program requirements for all parties participating in the design, procurement, demolition, construction, installation, inspection and testing for Project W-460

  18. Gulf of Mexico dissolved oxygen model (GoMDOM) research and quality assurance project plan

    Science.gov (United States)

    An integrated high resolution mathematical modeling framework is being developed that will link hydrodynamic, atmospheric, and water quality models for the northern Gulf of Mexico. This Research and Quality Assurance Project Plan primarily focuses on the deterministic Gulf of Me...

  19. 76 FR 53853 - Approval and Promulgation of Implementation Plans and Designation of Areas for Air Quality...

    Science.gov (United States)

    2011-08-30

    ... Action Network (LEAN) v. EPA, No. 02-60991). The issues raised concerned EPA's decision to approve... Ambient Air Quality Standard,'' Memorandum from John S. Seitz, Director, Office of Air Quality Planning...

  20. Software quality assurance plan for the National Ignition Facility integrated computer control system

    International Nuclear Information System (INIS)

    Woodruff, J.

    1996-11-01

    Quality achievement is the responsibility of the line organizations of the National Ignition Facility (NIF) Project. This Software Quality Assurance Plan (SQAP) applies to the activities of the Integrated Computer Control System (ICCS) organization and its subcontractors. The Plan describes the activities implemented by the ICCS section to achieve quality in the NIF Project's controls software and implements the NIF Quality Assurance Program Plan (QAPP, NIF-95-499, L-15958-2) and the Department of Energy's (DOE's) Order 5700.6C. This SQAP governs the quality affecting activities associated with developing and deploying all control system software during the life cycle of the NIF Project

  1. Quality assurance FY 1995 site support program plan WBS 6.7.2.5

    Energy Technology Data Exchange (ETDEWEB)

    Dell, L.D.

    1994-09-01

    This report is a summary of the quality assurance plan and program for the Westinghouse Hanford Company. The quality assurance plan verifies that the appropriate quality assurance programs and controls are applied to activities that affect quality related to work in: waste management; environmental activities (restoration, remediation, and monitoring); implementation of environmental, state, local, and federal regulations; tri-party agreement activities; facility operation and deactivation/transition to shutdown; new facility construction and operation.

  2. Quality assurance FY 1995 site support program plan WBS 6.7.2.5

    International Nuclear Information System (INIS)

    Dell, L.D.

    1994-09-01

    This report is a summary of the quality assurance plan and program for the Westinghouse Hanford Company. The quality assurance plan verifies that the appropriate quality assurance programs and controls are applied to activities that affect quality related to work in: waste management; environmental activities (restoration, remediation, and monitoring); implementation of environmental, state, local, and federal regulations; tri-party agreement activities; facility operation and deactivation/transition to shutdown; new facility construction and operation

  3. Evaluating which plan quality metrics are appropriate for use in lung SBRT.

    Science.gov (United States)

    Yaparpalvi, Ravindra; Garg, Madhur K; Shen, Jin; Bodner, William R; Mynampati, Dinesh K; Gafar, Aleiya; Kuo, Hsiang-Chi; Basavatia, Amar K; Ohri, Nitin; Hong, Linda X; Kalnicki, Shalom; Tome, Wolfgang A

    2018-02-01

    Several dose metrics in the categories-homogeneity, coverage, conformity and gradient have been proposed in literature for evaluating treatment plan quality. In this study, we applied these metrics to characterize and identify the plan quality metrics that would merit plan quality assessment in lung stereotactic body radiation therapy (SBRT) dose distributions. Treatment plans of 90 lung SBRT patients, comprising 91 targets, treated in our institution were retrospectively reviewed. Dose calculations were performed using anisotropic analytical algorithm (AAA) with heterogeneity correction. A literature review on published plan quality metrics in the categories-coverage, homogeneity, conformity and gradient was performed. For each patient, using dose-volume histogram data, plan quality metric values were quantified and analysed. For the study, the radiation therapy oncology group (RTOG) defined plan quality metrics were: coverage (0.90 ± 0.08); homogeneity (1.27 ± 0.07); conformity (1.03 ± 0.07) and gradient (4.40 ± 0.80). Geometric conformity strongly correlated with conformity index (p plan quality guidelines-coverage % (ICRU 62), conformity (CN or CI Paddick ) and gradient (R 50% ). Furthermore, we strongly recommend that RTOG lung SBRT protocols adopt either CN or CI Padddick in place of prescription isodose to target volume ratio for conformity index evaluation. Advances in knowledge: Our study metrics are valuable tools for establishing lung SBRT plan quality guidelines.

  4. Strategic planning applied to quality in asthma management for children.

    Science.gov (United States)

    Goonan, K J; Healy, J M; Jordan, H S; Zazzali, J L; Horowitz, M

    1993-01-01

    This strategic plan translates the HCHP vision statement into a working plan for one major clinical condition--asthma in children. It is a working plan for clinicians and managers across specialties and levels. The results of the projects will improve in a measurable way significant clinical practice and outcomes, in keeping with the FY 1993 strategic goals.

  5. Sandia National Laboratories Advanced Simulation and Computing (ASC) software quality plan : ASC software quality engineering practices Version 3.0.

    Energy Technology Data Exchange (ETDEWEB)

    Turgeon, Jennifer L.; Minana, Molly A.; Hackney, Patricia; Pilch, Martin M.

    2009-01-01

    The purpose of the Sandia National Laboratories (SNL) Advanced Simulation and Computing (ASC) Software Quality Plan is to clearly identify the practices that are the basis for continually improving the quality of ASC software products. Quality is defined in the US Department of Energy/National Nuclear Security Agency (DOE/NNSA) Quality Criteria, Revision 10 (QC-1) as 'conformance to customer requirements and expectations'. This quality plan defines the SNL ASC Program software quality engineering (SQE) practices and provides a mapping of these practices to the SNL Corporate Process Requirement (CPR) 001.3.6; 'Corporate Software Engineering Excellence'. This plan also identifies ASC management's and the software project teams responsibilities in implementing the software quality practices and in assessing progress towards achieving their software quality goals. This SNL ASC Software Quality Plan establishes the signatories commitments to improving software products by applying cost-effective SQE practices. This plan enumerates the SQE practices that comprise the development of SNL ASC's software products and explains the project teams opportunities for tailoring and implementing the practices.

  6. 78 FR 63929 - Approval and Promulgation of Air Quality Implementation Plans; Texas; Revisions to Rules and...

    Science.gov (United States)

    2013-10-25

    ... requirements for grandfathered facilities. The revisions will contribute to improvement in overall air quality... to contribute to improvement of air quality and attainment or maintenance of the federal air quality...] Approval and Promulgation of Air Quality Implementation Plans; Texas; Revisions to Rules and Regulations...

  7. Compression planning for continuous improvement in quality programs

    International Nuclear Information System (INIS)

    Willis, Y.A.; Hood, F.C.

    1992-01-01

    This paper describes Compression Planning, an innovative approach for planning in groups. This participative and structured approach is especially suitable for technical and highly regulated organizations. Compression Planning was applied to the first organization-wide effort at training integration for regulatory compliance, at Battelle Pacific Northwest Laboratory (PNL), a multi-program national laboratory. The planning process was judged as measurably superior to PNL's customary planning. Within 10 days a training policy was issued and an action plan drafted. The participants produced a report identifying and prioritizing 33 key training issues; began to data gather and solicit input from personnel Lab-wide, producing a 2-volume training inventory; and formulated 14 recommendations for implementation. Two years later the plan is still evolving, as PNL training continues to develop, consistent with Continuous Improvement Process objectives

  8. Analysis quality of content digital plan of cadastre lines (underground installation

    Directory of Open Access Journals (Sweden)

    Marinković Goran

    2016-01-01

    Full Text Available This work presents the results of research quality digital geodetic plans lines and underground installations. The study included the creation of a digital geodetic plan sewerage network vectorization of analogue geodetic plans and creation of digital geodetic plan of the same details from the original data survey and maintenance survey. Based on research results the analysis of the accuracy and reliability digital geodetic plan created vectoring analogue plan or 'digitizing from the screen'. The results obtained in this work, the can be use not only in the Republic of Serbia, but also in other countries where digitalization of geodetic plans are increasingly gaining in importance.

  9. Plan-provider integration, premiums, and quality in the Medicare Advantage market.

    Science.gov (United States)

    Frakt, Austin B; Pizer, Steven D; Feldman, Roger

    2013-12-01

    To investigate how integration between Medicare Advantage plans and health care providers is related to plan premiums and quality ratings. We used public data from the Centers for Medicare and Medicaid Services (CMS) and the Area Resource File and private data from one large insurer. Premiums and quality ratings are from 2009 CMS administrative files and some control variables are historical. We estimated ordinary least-squares models for premiums and plan quality ratings, with state fixed effects and firm random effects. The key independent variable was an indicator of plan-provider integration. With the exception of Medigap premium data, all data were publicly available. We ascertained plan-provider integration through examination of plans' websites and governance documents. We found that integrated plan-providers charge higher premiums, controlling for quality. Such plans also have higher quality ratings. We found no evidence that integration is associated with more generous benefits. Current policy encourages plan-provider integration, although potential effects on health insurance products and markets are uncertain. Policy makers and regulators may want to closely monitor changes in premiums and quality after integration and consider whether quality improvement (if any) justifies premium increases (if they occur). © Health Research and Educational Trust.

  10. Draft program plan for TNS: The Next Step after the Tokamak Fusion Test Reactor. Part IV. Program planning

    International Nuclear Information System (INIS)

    Wood, W.B.

    1977-02-01

    In this fourth part of the four-part TNS Draft Program Plan, project engineering concerns are considered. The TNS Project is first broken down into the major time and functional periods of feasibility study, preconceptual design, conceptual design, and line item construction, while the elements of the project are organized into an administrative work breakdown structure. With the aid of these two classifying schemes, the project tasks are described in terms of schedule, estimated cost, type of funding, and proposed type of participant. The initial constraints of completion data, anticipated scientific inputs, and budget procedures are used to develop a two-phase project in which the facilities are authorized first and the device 2 years later. This specific mechanism is fundamental to the construction of the schedule and should be reconsidered when the completion and initiation dates are reformulated

  11. Capsicum--production, technology, chemistry, and quality. Part IV. Evaluation of quality.

    Science.gov (United States)

    Govindarajan, V S; Rajalakshmi, D; Chand, N

    1987-01-01

    Capsicum fruits are popular worldwide and are used in the cuisines of both the developing and the developed countries. With its different varieties, forms, and uses, the spice capsicum contributes to the entire gamut of sensory experience--color as finely ground paprika powder or extract in sausages, goulash, cheese, and snacks; both pungency and color as the many varieties of chillies used in Mexican, African, Indian, and southeast Asian cuisines; color, aroma, and mild pungency as the fresh green chillies used in many of the growing countries; and appearance, color, aroma, and texture as fresh fruit in salads and as a pickled and canned product. In three earlier parts in this series, the varieties, cultivation, and primary processing; the processed products, world production, and trade; and the chemistry of the color, aroma, and pungency stimuli have been reviewed. In this part, the evaluation of quality through instrumental determination of the causal components and the sensory evaluation of color, aroma, and pungency are discussed. Several methods for quantitative determination of the stimuli and the sensory evaluation of the responses to the stimuli are reviewed. The problems of sensory evaluation of color, aroma, and pungency, the dominant attributes for validation of the instrumentally determined values for carotenoids, volatiles, or particular fractions, and total and individual capsaicinoids are specifically discussed. Summarized details of selected instrumental methods for evaluating the stimuli, which are either validated by correlation to sensorily perceived responses or to adopted standards, are given along with representative data obtained for discussing the adequacy and reliability of the methods. Pungency as a specific gustatory perception and the many methods proposed to evaluate this quality are discussed. A recommended objective procedure for obtaining reproducible values is discussed, and a method for relating different panel results is shown

  12. 77 FR 42686 - Approval and Promulgation of Air Quality Implementation Plans; Maryland; the 2002 Base Year...

    Science.gov (United States)

    2012-07-20

    ... Promulgation of Air Quality Implementation Plans; Maryland; the 2002 Base Year Inventory AGENCY: Environmental... matter (PM 2.5 ) 2002 base year emissions inventory portion of the Maryland State Implementation Plan... National Ambient Air Quality Standard (NAAQS) SIP. EPA is proposing to approve the 2002 base year PM 2.5...

  13. 78 FR 63937 - Approval and Promulgation of Implementation Plans; Approval and Promulgation of State Air Quality...

    Science.gov (United States)

    2013-10-25

    ... Quality Plans for Designated Facilities and Pollutants, State of Iowa; Control of Emissions From Existing Hospital/ Medical/Infectious Waste Incinerator Units, Negative Declaration and 111(d) Plan Rescission... existing state air quality rules, approve an exemption from constructing permitting for engines used in...

  14. 78 FR 63887 - Approval and Promulgation of Implementation Plans; Approval and Promulgation of State Air Quality...

    Science.gov (United States)

    2013-10-25

    ... Quality Plans for Designated Facilities and Pollutants, State of Iowa; Control of Emissions From Existing Hospital/ Medical/Infectious Waste Incinerator Units, Negative Declaration and 111(d) Plan Rescission... quality rules, approve an exemption from constructing permitting for engines used in periodic pipeline...

  15. 76 FR 72142 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2011-11-22

    ... the California State Implementation Plan, South Coast Air Quality Management District AGENCY... the South Coast Air Quality Management District portion of the California State Implementation Plan... Office of Management and Budget under Executive Order 12866 (58 FR 51735, October 4, 1993); Does not...

  16. 76 FR 76115 - Revisions to the California State Implementation Plan, Feather River Air Quality Management District

    Science.gov (United States)

    2011-12-06

    ... the California State Implementation Plan, Feather River Air Quality Management District AGENCY... limited disapproval of revisions to the Feather River Air Quality Management District (FRAQMD) portion of..., Regulatory Planning and Review The Office of Management and Budget (OMB) has exempted this regulatory action...

  17. Planning for quality stewardship: The sitewide environmental impact statement

    International Nuclear Information System (INIS)

    Webb, D.

    1995-01-01

    The U.S Department of Energy is responsible for managing many large tracts of Federal land throughout this country. These sites host the nation's nuclear weapons complex, national laboratories, environmental restoration facilities, and serve other uses. The Department faces unique problems in administering this land. Many have multiple activities taking place at the same time; for example, a site may simultaneously be used for energy research, technology development, waste disposal and wildlife habitat. The sites often use radioactive and other hazardous materials and many are contaminated as a result of past management practices. In 1992 the Department institutes a policy, as stated in its National Environmental Policy Act regulations [10 CFR 1021], to prepare sitewide environmental impact statements for its large, multipurpose sites. For the first time, through the sitewide environmental impact statement process, the Department has an effective tool to plan for quality stewardship of the lands and resources entrusted to its care. The sitewide environmental impact statement is a specialized type of programmatic environmental impact statement which allows the Department to look at the geographically connected actions taking place at a given site. The sitewide statement allows a comprehensive look at the operational baseline for the entire site to determine the total cumulative impact of ongoing operations at the site. The Department can identify areas where a change in management practices would mitigate undesirable impacts; areas not at issue could continue under existing practices. As a result, an environmentally-sound operating envelope can be established. This, in turn, can serve in the future as a threshold to decide if new proposals would result in significant impacts to the site as a whole, to simplify future National Environmental Policy Act reviews

  18. California Air Quality State Implementation Plans; Final Approval; Butte County Air Quality Management District; Stationary Source Permits

    Science.gov (United States)

    EPA is taking final action to approve a revision to the Butte County Air Quality Management District (BCAQMD) portion of the California State Implementation Plan (SIP). This revision concerns the District's New Source Review (NSR) permitting program.

  19. SU-F-T-272: Patient Specific Quality Assurance of Prostate VMAT Plans with Portal Dosimetry

    Energy Technology Data Exchange (ETDEWEB)

    Darko, J; Osei, E [Grand River Cancer Centre @ Grand River Hospital, Kitchener, ON (Canada); University of Waterloo, Waterloo, ON (Canada); Kiciak, A [University of Waterloo, Waterloo, ON (Canada); Badu, S; Grigorov, G; Fleck, A [Grand River Cancer Centre @ Grand River Hospital, Kitchener, ON (Canada)

    2016-06-15

    Purpose: To evaluate the effectiveness of using the Portal Dosimetry (PD) method for patient specific quality assurance of prostate VMAT plans. Methods: As per institutional protocol all VMAT plans were measured using the Varian Portal Dosimetry (PD) method. A gamma evaluation criterion of 3%-3mm with a minimum area gamma pass rate (gamma <1) of 95% is used clinically for all plans. We retrospectively evaluated the portal dosimetry results for 170 prostate patients treated with VMAT technique. Three sets of criterions were adopted for re-evaluating the measurements; 3%-3mm, 2%-2mm and 1%-1mm. For all criterions two areas, Field+1cm and MLC-CIAO were analysed.To ascertain the effectiveness of the portal dosimetry technique in determining the delivery accuracy of prostate VMAT plans, 10 patients previously measured with portal dosimetry, were randomly selected and their measurements repeated using the ArcCHECK method. The same criterion used in the analysis of PD was used for the ArcCHECK measurements. Results: All patient plans reviewed met the institutional criteria for Area Gamma pass rate. Overall, the gamma pass rate (gamma <1) decreases for 3%-3mm, 2%-2mm and 1%-1mm criterion. For each criterion the pass rate was significantly reduced when the MLC-CIAO was used instead of FIELD+1cm. There was noticeable change in sensitivity for MLC-CIAO with 2%-2mm criteria and much more significant reduction at 1%-1mm. Comparable results were obtained for the ArcCHECK measurements. Although differences were observed between the clockwise verses the counter clockwise plans in both the PD and ArcCHECK measurements, this was not deemed to be statistically significant. Conclusion: This work demonstrates that Portal Dosimetry technique can be effectively used for quality assurance of VMAT plans. Results obtained show similar sensitivity compared to ArcCheck. To reveal certain delivery inaccuracies, the use of a combination of criterions may provide an effective way in improving

  20. Effluent monitoring Quality Assurance Project Plan for radioactive airborne emissions data. Revision 2

    International Nuclear Information System (INIS)

    Frazier, T.P.

    1995-12-01

    This Quality Assurance Project Plan addresses the quality assurance requirements for compiling Hanford Site radioactive airborne emissions data. These data will be reported to the U.S. Environmental Protection Agency, the US Department of Energy, and the Washington State Department of Health. Effluent Monitoring performs compliance assessments on radioactive airborne sampling and monitoring systems. This Quality Assurance Project Plan is prepared in compliance with interim guidelines and specifications. Topics include: project description; project organization and management; quality assurance objectives; sampling procedures; sample custody; calibration procedures; analytical procedures; monitoring and reporting criteria; data reduction, verification, and reporting; internal quality control; performance and system audits; corrective actions; and quality assurance reports

  1. River Quality Investigations, Part 1: Some Diversity and Biotic Indices.

    Science.gov (United States)

    Hewitt, G.

    1991-01-01

    The following indices for assessing river water quality are described: Shannon-Weiner Diversity Index, Sorenson Quotient of Similarity, Czekanowski's Index of Similarity, Trent Biotic Index, Chandler Score, and Biological Monitoring Working Party Score. Their advantages and disadvantages are outlined. (Author)

  2. Waste Management facilities cost information: System Cost Model Software Quality Assurance Plan. Revision 2

    International Nuclear Information System (INIS)

    Peterson, B.L.; Lundeen, A.S.

    1996-02-01

    In May of 1994, Lockheed Idaho Technologies Company (LITCO) in Idaho Falls, Idaho and subcontractors developed the System Cost Model (SCM) application. The SCM estimates life-cycle costs of the entire US Department of Energy (DOE) complex for designing; constructing; operating; and decommissioning treatment, storage, and disposal (TSD) facilities for mixed low-level, low-level, transuranic, and mixed transuranic waste. The SCM uses parametric cost functions to estimate life-cycle costs for various treatment, storage, and disposal modules which reflect planned and existing facilities at DOE installations. In addition, SCM can model new facilities based on capacity needs over the program life cycle. The SCM also provides transportation costs for truck and rail, which include transport of contact-handled, remote-handled, and alpha (transuranic) wastes. The user can provide input data (default data is included in the SCM) including the volume and nature of waste to be managed, the time period over which the waste is to be managed, and the configuration of the waste management complex (i.e., where each installation's generated waste will be treated, stored, and disposed). Then the SCM uses parametric cost equations to estimate the costs of pre-operations (designing), construction costs, operation management, and decommissioning these waste management facilities. For the product to be effective and useful the SCM users must have a high level of confidence in the data generated by the software model. The SCM Software Quality Assurance Plan is part of the overall SCM project management effort to ensure that the SCM is maintained as a quality product and can be relied on to produce viable planning data. This document defines tasks and deliverables to ensure continued product integrity, provide increased confidence in the accuracy of the data generated, and meet the LITCO's quality standards during the software maintenance phase. 8 refs., 1 tab

  3. Waste Management facilities cost information: System Cost Model Software Quality Assurance Plan. Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    Peterson, B.L.; Lundeen, A.S.

    1996-02-01

    In May of 1994, Lockheed Idaho Technologies Company (LITCO) in Idaho Falls, Idaho and subcontractors developed the System Cost Model (SCM) application. The SCM estimates life-cycle costs of the entire US Department of Energy (DOE) complex for designing; constructing; operating; and decommissioning treatment, storage, and disposal (TSD) facilities for mixed low-level, low-level, transuranic, and mixed transuranic waste. The SCM uses parametric cost functions to estimate life-cycle costs for various treatment, storage, and disposal modules which reflect planned and existing facilities at DOE installations. In addition, SCM can model new facilities based on capacity needs over the program life cycle. The SCM also provides transportation costs for truck and rail, which include transport of contact-handled, remote-handled, and alpha (transuranic) wastes. The user can provide input data (default data is included in the SCM) including the volume and nature of waste to be managed, the time period over which the waste is to be managed, and the configuration of the waste management complex (i.e., where each installation`s generated waste will be treated, stored, and disposed). Then the SCM uses parametric cost equations to estimate the costs of pre-operations (designing), construction costs, operation management, and decommissioning these waste management facilities. For the product to be effective and useful the SCM users must have a high level of confidence in the data generated by the software model. The SCM Software Quality Assurance Plan is part of the overall SCM project management effort to ensure that the SCM is maintained as a quality product and can be relied on to produce viable planning data. This document defines tasks and deliverables to ensure continued product integrity, provide increased confidence in the accuracy of the data generated, and meet the LITCO`s quality standards during the software maintenance phase. 8 refs., 1 tab.

  4. Evaluation of plan quality assurance models for prostate cancer patients based on fully automatically generated Pareto-optimal treatment plans.

    Science.gov (United States)

    Wang, Yibing; Breedveld, Sebastiaan; Heijmen, Ben; Petit, Steven F

    2016-06-07

    IMRT planning with commercial Treatment Planning Systems (TPSs) is a trial-and-error process. Consequently, the quality of treatment plans may not be consistent among patients, planners and institutions. Recently, different plan quality assurance (QA) models have been proposed, that could flag and guide improvement of suboptimal treatment plans. However, the performance of these models was validated using plans that were created using the conventional trail-and-error treatment planning process. Consequently, it is challenging to assess and compare quantitatively the accuracy of different treatment planning QA models. Therefore, we created a golden standard dataset of consistently planned Pareto-optimal IMRT plans for 115 prostate patients. Next, the dataset was used to assess the performance of a treatment planning QA model that uses the overlap volume histogram (OVH). 115 prostate IMRT plans were fully automatically planned using our in-house developed TPS Erasmus-iCycle. An existing OVH model was trained on the plans of 58 of the patients. Next it was applied to predict DVHs of the rectum, bladder and anus of the remaining 57 patients. The predictions were compared with the achieved values of the golden standard plans for the rectum D mean, V 65, and V 75, and D mean of the anus and the bladder. For the rectum, the prediction errors (predicted-achieved) were only  -0.2  ±  0.9 Gy (mean  ±  1 SD) for D mean,-1.0  ±  1.6% for V 65, and  -0.4  ±  1.1% for V 75. For D mean of the anus and the bladder, the prediction error was 0.1  ±  1.6 Gy and 4.8  ±  4.1 Gy, respectively. Increasing the training cohort to 114 patients only led to minor improvements. A dataset of consistently planned Pareto-optimal prostate IMRT plans was generated. This dataset can be used to train new, and validate and compare existing treatment planning QA models, and has been made publicly available. The OVH model was highly accurate

  5. Engineering Knowledge for Automated Planning: Towards a Notion of Quality

    OpenAIRE

    McCluskey, T.L.; Vaquero, Tiago; Vallati, Mauro

    2017-01-01

    Automated planning is a prominent Artificial Intelligence challenge, as well as being a common capability requirement for intelligent\\ud autonomous agents. A critical aspect of what is called domain-independent planning, is the application knowledge that must be added to the planner to create a complete planning application. This is made explicit in (i) a domain model, which is a formal representation of the persistent domain knowledge, and (ii) an associated problem instance, containing the ...

  6. Automation and Intensity Modulated Radiation Therapy for Individualized High-Quality Tangent Breast Treatment Plans

    International Nuclear Information System (INIS)

    Purdie, Thomas G.; Dinniwell, Robert E.; Fyles, Anthony; Sharpe, Michael B.

    2014-01-01

    Purpose: To demonstrate the large-scale clinical implementation and performance of an automated treatment planning methodology for tangential breast intensity modulated radiation therapy (IMRT). Methods and Materials: Automated planning was used to prospectively plan tangential breast IMRT treatment for 1661 patients between June 2009 and November 2012. The automated planning method emulates the manual steps performed by the user during treatment planning, including anatomical segmentation, beam placement, optimization, dose calculation, and plan documentation. The user specifies clinical requirements of the plan to be generated through a user interface embedded in the planning system. The automated method uses heuristic algorithms to define and simplify the technical aspects of the treatment planning process. Results: Automated planning was used in 1661 of 1708 patients receiving tangential breast IMRT during the time interval studied. Therefore, automated planning was applicable in greater than 97% of cases. The time for treatment planning using the automated process is routinely 5 to 6 minutes on standard commercially available planning hardware. We have shown a consistent reduction in plan rejections from plan reviews through the standard quality control process or weekly quality review multidisciplinary breast rounds as we have automated the planning process for tangential breast IMRT. Clinical plan acceptance increased from 97.3% using our previous semiautomated inverse method to 98.9% using the fully automated method. Conclusions: Automation has become the routine standard method for treatment planning of tangential breast IMRT at our institution and is clinically feasible on a large scale. The method has wide clinical applicability and can add tremendous efficiency, standardization, and quality to the current treatment planning process. The use of automated methods can allow centers to more rapidly adopt IMRT and enhance access to the documented

  7. Commissioning and quality assurances of the CMS XIO radiotherapy treatment planning system for external beam photons

    International Nuclear Information System (INIS)

    Muralidhar, K.R.; Anurupa; Soubhagya; Sudhakar; Shiva; Krishnam Raju, A.; Narayana Murthy, P.

    2008-01-01

    The commissioning of XIO treatment planning system (TPS) was carried out by Computerized Medical Devices, USA for Siemens and Elekta linear accelerators. The Commissioning and quality assurance of the CMS XIO radiotherapy treatment planning system involves many steps, beginning from beam data acquisition and entry into the computerized TPS, through patient data acquisition, to treatment plan generation and the final transfer of data to the treatment machine and quality assurance of TPS

  8. Quality assessment for VMAT prostate radiotherapy planning based on data envelopment analysis

    International Nuclear Information System (INIS)

    Lin, Kuan-Min; Simpson, John; Raith, Andrea; Ehrgott, Matthias; Sasso, Giuseppe

    2013-01-01

    The majority of commercial radiotherapy treatment planning systems requires planners to iteratively adjust the plan parameters in order to find a satisfactory plan. This iterative trial-and-error nature of radiotherapy treatment planning results in an inefficient planning process and in order to reduce such inefficiency, plans can be accepted without achieving the best attainable quality. We propose a quality assessment method based on data envelopment analysis (DEA) to address this inefficiency. This method compares a plan of interest to a set of past delivered plans and searches for evidence of potential further improvement. With the assistance of DEA, planners will be able to make informed decisions on whether further planning is required and ensure that a plan is only accepted when the plan quality is close to the best attainable one. We apply the DEA method to 37 prostate plans using two assessment parameters: rectal generalized equivalent uniform dose (gEUD) as the input and D95 (the minimum dose that is received by 95% volume of a structure) of the planning target volume (PTV) as the output. The percentage volume of rectum overlapping PTV is used to account for anatomical variations between patients and is included in the model as a non-discretionary output variable. Five plans that are considered of lesser quality by DEA are re-optimized with the goal to further improve rectal sparing. After re-optimization, all five plans improve in rectal gEUD without clinically considerable deterioration of the PTV D95 value. For the five re-optimized plans, the rectal gEUD is reduced by an average of 1.84 Gray (Gy) with only an average reduction of 0.07 Gy in PTV D95. The results demonstrate that DEA can correctly identify plans with potential improvements in terms of the chosen input and outputs. (paper)

  9. Quality and safety is the integral part of our business

    International Nuclear Information System (INIS)

    Fadeev, Y.

    2011-01-01

    During 65 years from Joint-stock Company Afrikantov OKBM foundation over 400 reactor projects were developed - primarily, various modifications of marine propulsion reactors for nuclear submarines and icebreakers of several generations. Today, OKBM designs reactors of various types and purposes as well as equipment, control and protection mechanisms, and is the world leader in fast-neutron sodium-cooled reactor technology. Much attention in OKBM is given to the safety and quality of production, specialists education [ru

  10. Waste Management Project Quality Assurance Program Plan (QAPP)

    International Nuclear Information System (INIS)

    HORHOTA, M.J.

    2000-01-01

    The Waste Management Project (WMP) is committed to excellence in our work and to delivering quality products and services to our customers, protecting our employees and the public and to being good stewards of the environment. We will continually strive to understand customer requirements, perform services, and activities that meet or exceed customer expectations, and be cost-effective in our performance. The WMP maintains an environment that fosters continuous improvement in our processes, performance, safety and quality. The achievement of quality will require the total commitment of all WMP employees to our ethic that Quality, Health and Safety, and Regulatory Compliance must come before profits. The successful implementation of this policy and ethic requires a formal, documented management quality system to ensure quality standards are established and achieved in all activities. The following principles are the foundation of our quality system. Senior management will take full ownership of the quality system and will create an environment that ensures quality objectives are met, standards are clearly established, and performance is measured and evaluated. Line management will be responsible for quality system implementation. Each organization will adhere to all quality system requirements that apply to their function. Every employee will be responsible for their work quality, to work safely and for complying with the policies, procedures and instructions applicable to their activities. Quality will be addressed and verified during all phases of our work scope from proposal development through closeout including contracts or projects. Continuous quality improvement will be an ongoing process. Our quality ethic and these quality principles constantly guide our actions. We will meet our own quality expectations and exceed those of our customers with vigilance, commitment, teamwork, and persistence

  11. Quality Assurance Program Plan (QAPP) Waste Management Project

    Energy Technology Data Exchange (ETDEWEB)

    HORHOTA, M.J.

    2000-12-21

    The Waste Management Project (WMP) is committed to excellence in our work and to delivering quality products and services to our customers, protecting our employees and the public and to being good stewards of the environment. We will continually strive to understand customer requirements, perform services, and activities that meet or exceed customer expectations, and be cost-effective in our performance. The WMP maintains an environment that fosters continuous improvement in our processes, performance, safety and quality. The achievement of quality will require the total commitment of all WMP employees to our ethic that Quality, Health and Safety, and Regulatory Compliance must come before profits. The successful implementation of this policy and ethic requires a formal, documented management quality system to ensure quality standards are established and achieved in all activities. The following principles are the foundation of our quality system. Senior management will take full ownership of the quality system and will create an environment that ensures quality objectives are met, standards are clearly established, and performance is measured and evaluated. Line management will be responsible for quality system implementation. Each organization will adhere to all quality system requirements that apply to their function. Every employee will be responsible for their work quality, to work safely and for complying with the policies, procedures and instructions applicable to their activities. Quality will be addressed and verified during all phases of our work scope from proposal development through closeout including contracts or projects. Continuous quality improvement will be an ongoing process. Our quality ethic and these quality principles constantly guide our actions. We will meet our own quality expectations and exceed those of our customers with vigilance, commitment, teamwork, and persistence.

  12. Transmission investment and planning in deregulated market environment : a literature survey (part 1)

    International Nuclear Information System (INIS)

    Wen, F.; Wu, F.F.

    2005-01-01

    This paper is the first half of a 2-part paper that provided details of a comprehensive survey of issues related to transmission investment and expansion planning in the electricity market. The lack of adequate transmission capacity has played an important role in recent power crises, and deregulation has had a significant impact on the investment and planning process of transmission systems. The main objective of transmission investment is to meet load demands as cheaply as possible. In a deregulated market, there is no longer centrally coordinated planning of new generation. Transmission planning is generally not coordinated with generation planning. There is considerable uncertainty with regard to transmission capacity requirements due to long lead times for transmission construction. Generating plants and transmission lines are built according to investor assessments and private interests, and current transmission systems were not designed to handle supply and demand patterns in competitive markets. It was recommended that new transmission plans should meet reliability requirements while minimizing expected unserved energy. It was concluded that reliability criteria must be redefined to account for the fact that transmission systems are more stressed under deregulation. Two popular financial transmission rights were also discussed, notably (1) point-to-point financial transmission rights (FTR); and (2) financial flowgate rights (FGR)

  13. Using SQUIRE 2.0 as a Guide for Planning Your Quality Improvement Project.

    Science.gov (United States)

    Stausmire, Julie M; Ulrich, Charla

    2017-12-01

    This article is the third of a 4-part quality improvement resource series for critical care nurses interested in implementing system process or performance improvement projects. Part 1 defined the differences between research and quality improvement. Part 2 discussed how nurses and managers could identify meaningful quality improvement projects that will make a real difference in their critical care unit while fitting within their time constraints and resources. Part 3 uses the recently revised Standards for Quality Improvement Reporting Excellence guidelines as a basis for designing, implementing, documenting, and publishing quality improvement projects. © 2017 American Association of Critical-Care Nurses.

  14. Corporate management of quality in employee health plans.

    Science.gov (United States)

    Maxwell, James; Temin, Peter

    2003-01-01

    As large companies move their employees into managed care, they must concern themselves with the quality and price of their employees' health care. Based on a survey of Fortune 500 companies, we show that most are integrating several aspects of quality into their purchasing and contracting decisions by focusing on three dimensions--customer service, network composition, and clinical quality. Companies focus on the customer service dimension while the medical community emphasizes clinical quality.

  15. Initiatives to Improve Quality of Additively Manufactured Parts

    Science.gov (United States)

    Waller, Jess; Nichols, Charles

    2017-01-01

    NASA is providing leadership in an international effort linking government and industry resources to speed adoption of additive manufactured (AM) parts. Participants include government agencies (NASA, USAF, NIST, FAA), industry (commercial aerospace, NDE manufacturers, AM equipment manufacturers), standards organizations and academia. NASA is also partnering with its international space exploration organizations such as ESA and JAXA. NDT is identified as a universal need for all aspects of additive manufacturing.

  16. Individualized Quality Control Plan (IQCP): Is It Value-Added for Clinical Microbiology?

    OpenAIRE

    Sharp, Susan E.; Miller, Melissa B.; Hindler, Janet

    2015-01-01

    The Center for Medicaid and Medicare Services (CMS) recently published their Individualized Quality Control Plan (IQCP [https://www.cms.gov/regulations-and-guidance/legislation/CLIA/Individualized_Quality_Control_Plan_IQCP.html]), which will be the only option for quality control (QC) starting in January 2016 if laboratories choose not to perform Clinical Laboratory Improvement Act (CLIA) [U.S. Statutes at Large 81(1967):533] default QC. Laboratories will no longer be able to use “equivalent ...

  17. Sunway Medical Laboratory Quality Control Plans Based on Six Sigma, Risk Management and Uncertainty.

    Science.gov (United States)

    Jairaman, Jamuna; Sakiman, Zarinah; Li, Lee Suan

    2017-03-01

    Sunway Medical Centre (SunMed) implemented Six Sigma, measurement uncertainty, and risk management after the CLSI EP23 Individualized Quality Control Plan approach. Despite the differences in all three approaches, each implementation was beneficial to the laboratory, and none was in conflict with another approach. A synthesis of these approaches, built on a solid foundation of quality control planning, can help build a strong quality management system for the entire laboratory. Copyright © 2016 Elsevier Inc. All rights reserved.

  18. Sanitary landfill groundwater quality assessment plan Savannah River Site

    Energy Technology Data Exchange (ETDEWEB)

    Wells, D.G.; Cook, J.W.

    1990-06-01

    This assessment monitoring plan has been prepared in accordance with the guidance provided by the SCDHEC in a letter dated December 7, 1989 from Pearson to Wright and a letter dated October 9, 1989 from Keisler to Lindler. The letters are included a Appendix A, for informational purposes. Included in the plan are all of the monitoring data from the landfill monitoring wells for 1989, and a description of the present monitoring well network. The plan proposes thirty-two new wells and an extensive coring project that includes eleven soil borings. Locations of the proposed wells attempt to follow the SCDHEC guidelines and are downgradient, sidegradient and in the heart of suspected contaminant plumes. Also included in the plan is the current Savannah River Site Sampling and Analysis Plan and the well construction records for all of the existing monitoring wells around the sanitary landfill.

  19. The planning strategic and its influence in the quality of educational management of Technical University of Babahoyo

    Directory of Open Access Journals (Sweden)

    Pedro Romero Robles

    2016-06-01

    Full Text Available The systems and elements of administration and planning have become in essential parts to reduce, mitigate or prevent difficulties and problems, so the relationship of planning has its incidence in the educative management quality too. All of this, leads to direct and facilitate different processes: First, the opportunities and benefits to improve the decision-making to facilitate the generation of capabilities of the people and some organizations for entrepreneurship plans, projects and activities and second, to articulate the integration of strategies and tools for participation, coordination and concerted action to enable the educational, administrative, financial development and coordination of sectors and value chains in planning processes. All these consequences will help us to achieve the desired objectives.

  20. Atomic Energy Control Board 1991-92 estimates part III expenditure plan

    International Nuclear Information System (INIS)

    1991-01-01

    This Expenditure Plan is designed to be used as a reference document. As such, it contains several levels of detail to respond to the various needs of its audience. This Plan is divided into two sections. Section 1 presents an overview of the Program including a description, information on its background, objectives and planning perspective as well as performance information that forms the basis for the resources requested. Section 2 provides further information on costs and resources as well as special analyses that the reader may require to understand the Program more fully. Section 1 is preceded by details of Spending Authorities from Part 2 of the Estimates and Volume 2 of the Public Accounts. This is to provide continuity with other Estimates documents and to help in assessing the Program's financial performance over the past year. 22 figs

  1. Atomic Energy Control Board 1991-92 estimates part III expenditure plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1992-12-31

    This Expenditure Plan is designed to be used as a reference document. As such, it contains several levels of detail to respond to the various needs of its audience. This Plan is divided into two sections. Section 1 presents an overview of the Program including a description, information on its background, objectives and planning perspective as well as performance information that forms the basis for the resources requested. Section 2 provides further information on costs and resources as well as special analyses that the reader may require to understand the Program more fully. Section 1 is preceded by details of Spending Authorities from Part 2 of the Estimates and Volume 2 of the Public Accounts. This is to provide continuity with other Estimates documents and to help in assessing the Program`s financial performance over the past year. 22 figs.

  2. Atomic Energy Control Board 1992-93 estimates part III expenditure plan

    International Nuclear Information System (INIS)

    1992-01-01

    This Expenditure Plan is designed to be used as a reference document. As such, it contains several levels of detail to respond to the various needs of its audience. This Plan is divided into two sections. Section 1 presents an overview of the Program including a description, information on its background, objectives and planning perspective as well as performance information that forms the basis for the resources requested. Section 2 provides further information on costs and resources as well as special analyses that the reader may require to understand the Program more fully. Section 1 is preceded by details of Spending Authorities from Part 2 of the Estimates and Volume 2 of the Public Accounts. This is to provide continuity with other Estimates documents and to help in assessing the Program's financial performance over the past year. 7 refs., 21 figs

  3. Atomic Energy Control Board 1992-93 estimates part III expenditure plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1993-12-31

    This Expenditure Plan is designed to be used as a reference document. As such, it contains several levels of detail to respond to the various needs of its audience. This Plan is divided into two sections. Section 1 presents an overview of the Program including a description, information on its background, objectives and planning perspective as well as performance information that forms the basis for the resources requested. Section 2 provides further information on costs and resources as well as special analyses that the reader may require to understand the Program more fully. Section 1 is preceded by details of Spending Authorities from Part 2 of the Estimates and Volume 2 of the Public Accounts. This is to provide continuity with other Estimates documents and to help in assessing the Program`s financial performance over the past year. 7 refs., 21 figs.

  4. Route planning module as a part of Supply Chain Management system

    Directory of Open Access Journals (Sweden)

    Michal Košíček

    2012-01-01

    Full Text Available Today, the demand for creating a systematic approach for managing sales, ordering, and logistics has increased. Supply Chain Management (SCM is one of the responses to problems that have arose with the need for managing complex supply chains. Nowadays, most of the activities of Supply Chain Management is realized or supported with computing technologies. Route planning is an important part of Supply Chain Management related to both procurement and distribution. Route planning systems specify the sequences in which the selected transport vehicles should supply the demand points by requested quantities of goods at the right time. The paper is focused on the analysis of a route planning system which could be used as a part of Supply Chain Management information system or as a standalone application. It describes basic techniques and frameworks of transportation problems as well as important functional requirements, considering recent trends in the field of distribution planning. As a result, functional specification of basic features and other components of system are provided. The paper is a result of a joint initiative of the authors and a vendor of business information systems.

  5. A clinical distance measure for evaluating treatment plan quality difference with Pareto fronts in radiotherapy

    Directory of Open Access Journals (Sweden)

    Kristoffer Petersson

    2017-07-01

    Full Text Available We present a clinical distance measure for Pareto front evaluation studies in radiotherapy, which we show strongly correlates (r = 0.74 and 0.90 with clinical plan quality evaluation. For five prostate cases, sub-optimal treatment plans located at a clinical distance value of >0.32 (0.28–0.35 from fronts of Pareto optimal plans, were assessed to be of lower plan quality by our (12 observers (p < .05. In conclusion, the clinical distance measure can be used to determine if the difference between a front and a given plan (or between different fronts corresponds to a clinically significant plan quality difference.

  6. Quality assurance program plan for low-level waste at the WSCF Laboratory

    International Nuclear Information System (INIS)

    Morrison, J.A.

    1994-01-01

    The purpose of this document is to provide guidance for the implementation of the Quality Assurance Program Plan (QAPP) for the management of low-level waste at the Waste Sampling and Characterization Facility (WSCF) Laboratory Complex as required by WHC-CM-4-2, Quality Assurance Manual, which is based on Quality Assurance Program Requirements for Nuclear Facilities, NQA-1 (ASME)

  7. 76 FR 29153 - Revisions to the California State Implementation Plan, Mojave Desert Air Quality Management District

    Science.gov (United States)

    2011-05-20

    ... the California State Implementation Plan, Mojave Desert Air Quality Management District AGENCY... approve revisions to the Mojave Desert Air Quality Management District (MDAQMD) portion of the California... approving with the dates that they were adopted by the Mojave Desert Air Quality Management District (MDAQMD...

  8. 78 FR 37757 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2013-06-24

    ... the California State Implementation Plan, South Coast Air Quality Management District AGENCY... the South Coast Air Quality Management District (SCAQMD) portion of the California State... Quality Index rather than on 1-hour ozone forecasted values; (b) forecast criteria for allowing a...

  9. 78 FR 58459 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Science.gov (United States)

    2013-09-24

    ... the California State Implementation Plan, Antelope Valley Air Quality Management District, Santa Barbara County Air Pollution Control District, South Coast Air Quality Management District and Ventura.... SUMMARY: EPA is finalizing approval of revisions to the Antelope Valley Air Quality Management District...

  10. 76 FR 40303 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2011-07-08

    ... the California State Implementation Plan, South Coast Air Quality Management District AGENCY... limited disapproval of revisions to the South Coast Air Quality Management District (SCAQMD) portion of... designated nonattainment for the fine particulate matter (PM2.5) National Ambient Air Quality Standards...

  11. 75 FR 32293 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2010-06-08

    ... the California State Implementation Plan, South Coast Air Quality Management District AGENCY... approve revisions to the South Coast Air Quality Management District (SCAQMD) portion of the California... submit regulations that control the primary and secondary National Ambient Air Quality Standards (NAAQS...

  12. 76 FR 78829 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2011-12-20

    ... the California State Implementation Plan, South Coast Air Quality Management District AGENCY... approve a revision to the South Coast Air Quality Management District (SCAQMD) portion of the California... Reference (A) South Coast Air Quality Management District (1) Rule 2005, ``New Source Review for RECLAIM...

  13. 77 FR 39181 - Revisions to the California State Implementation Plan, Mojave Desert Air Quality Management...

    Science.gov (United States)

    2012-07-02

    ... the California State Implementation Plan, Mojave Desert Air Quality Management District (MDAQMD) and Yolo-Solano Air Quality Management District (YSAQMD) AGENCY: Environmental Protection Agency (EPA... Air Quality Management District. (1) Rule 1165, ``Glass Melting Furnaces,'' amended on August 25, 2008...

  14. 77 FR 74372 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2012-12-14

    ... the California State Implementation Plan, South Coast Air Quality Management District AGENCY... of South Coast Air Quality Management District (SCAQMD) Rule 317, ``Clean Air Act Non- Attainment Fee... of Appeals for the District of Columbia Circuit. South Coast Air Quality Management District v. EPA...

  15. 76 FR 47074 - Revision to the California State Implementation Plan; South Coast Air Quality Management District

    Science.gov (United States)

    2011-08-04

    ... California State Implementation Plan; South Coast Air Quality Management District AGENCY: Environmental... revision to the South Coast Air Quality Management District portion of the California State Implementation... Submittal A. What rule did the State submit? We are approving South Coast Air Quality Management District...

  16. 78 FR 18853 - Revision to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2013-03-28

    ... California State Implementation Plan, South Coast Air Quality Management District AGENCY: Environmental... revision to the South Coast Air Quality Management District (SCAQMD) portion of the California State...) * * * (411) * * * (i) * * * (F) South Coast Air Quality Management District. (1) Rule 463, ``Organic Liquid...

  17. 77 FR 11990 - Revisions to the California State Implementation Plan, Mojave Desert Air Quality Management...

    Science.gov (United States)

    2012-02-28

    ... the California State Implementation Plan, Mojave Desert Air Quality Management District and Yolo-Solano Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve revisions to the Mojave Desert Air Quality Management...

  18. 76 FR 38572 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Science.gov (United States)

    2011-07-01

    ... the California State Implementation Plan, Antelope Valley Air Quality Management District AGENCY... approve revisions to the Antelope Valley Air Quality Management District (AVAQMD) portion of the... approving with the dates that they were adopted by the Antelope Valley Air Quality Management District...

  19. 77 FR 1895 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2012-01-12

    ... the California State Implementation Plan, South Coast Air Quality Management District AGENCY... approve South Coast Air Quality Management District (SCAQMD) Rule 317, ``Clean Air Act Non- Attainment Fee... Air Quality Management District There are two 1-hour ozone nonattainment areas within the jurisdiction...

  20. 77 FR 12493 - Revisions to the California State Implementation Plan, Feather River Air Quality Management District

    Science.gov (United States)

    2012-03-01

    ... the California State Implementation Plan, Feather River Air Quality Management District AGENCY... limited disapproval of revisions to the Feather River Air Quality Management District (FRAQMD) portion of.... * * * * * (c) * * * (378) * * * (i) * * * (E) Feather River Air Quality Management District. (1) Rule 3.22...

  1. 76 FR 41717 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2011-07-15

    ... the California State Implementation Plan, South Coast Air Quality Management District AGENCY... approve revisions to the South Coast Air Quality Management District (SCAQMD) portion of the California... Governor's Designee. (i) Incorporation by reference. (A) South Coast Air Quality Management District. (1...

  2. 78 FR 59249 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2013-09-26

    ...] Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY... the South Coast Air Quality Management District (SCAQMD) portion of the California State...'s Designee. (i) Incorporation by Reference. (A) South Coast Air Quality Management District. (1...

  3. 78 FR 25011 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Science.gov (United States)

    2013-04-29

    ... the California State Implementation Plan, Antelope Valley Air Quality Management District, Santa Barbara County Air Pollution Control District, South Coast Air Quality Management District and Ventura... rule. SUMMARY: EPA is proposing to approve revisions to the Antelope Valley Air Quality Management...

  4. 77 FR 58076 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2012-09-19

    ... the California State Implementation Plan, South Coast Air Quality Management District AGENCY... the South Coast Air Quality Management District (SCAQMD) portion of the California State... Quality Standards (NAAQS). The revisions to the primary and secondary Lead NAAQS were to provide increased...

  5. Nevada Nuclear Waste Storage Investigations Quality-Assurance Program Plan: management and overview

    International Nuclear Information System (INIS)

    1981-10-01

    This Quality Assurance Program Plan (QAPP) defines the quality assurance program in effect for those activities of the Nevada Nuclear Waste Storage (NNWSI) that are directly controlled by: DOE/NV, the Technical Overview Contractor, and the Quality Assurance Overview Contractor. It is intended as a supplement to the NNWSI-QAP

  6. Impact of leaf motion constraints on IMAT plan quality, deliver accuracy, and efficiency

    International Nuclear Information System (INIS)

    Chen Fan; Rao Min; Ye Jinsong; Shepard, David M.; Cao Daliang

    2011-01-01

    Purpose: Intensity modulated arc therapy (IMAT) is a radiation therapy delivery technique that combines the efficiency of arc based delivery with the dose painting capabilities of intensity modulated radiation therapy (IMRT). A key challenge in developing robust inverse planning solutions for IMAT is the need to account for the connectivity of the beam shapes as the gantry rotates from one beam angle to the next. To overcome this challenge, inverse planning solutions typically impose a leaf motion constraint that defines the maximum distance a multileaf collimator (MLC) leaf can travel between adjacent control points. The leaf motion constraint ensures the deliverability of the optimized plan, but it also impacts the plan quality, the delivery accuracy, and the delivery efficiency. In this work, the authors have studied leaf motion constraints in detail and have developed recommendations for optimizing the balance between plan quality and delivery efficiency. Methods: Two steps were used to generate optimized IMAT treatment plans. The first was the direct machine parameter optimization (DMPO) inverse planning module in the Pinnacle 3 planning system. Then, a home-grown arc sequencer was applied to convert the optimized intensity maps into deliverable IMAT arcs. IMAT leaf motion constraints were imposed using limits of between 1 and 30 mm/deg. Dose distributions were calculated using the convolution/superposition algorithm in the Pinnacle 3 planning system. The IMAT plan dose calculation accuracy was examined using a finer sampling calculation and the quality assurance verification. All plans were delivered on an Elekta Synergy with an 80-leaf MLC and were verified using an IBA MatriXX 2D ion chamber array inserted in a MultiCube solid water phantom. Results: The use of a more restrictive leaf motion constraint (less than 1-2 mm/deg) results in inferior plan quality. A less restrictive leaf motion constraint (greater than 5 mm/deg) results in improved plan quality

  7. Effect of power quality on windings temperature of marine induction motors. Part I: Machine model

    Energy Technology Data Exchange (ETDEWEB)

    Gnacinski, P. [Gdynia Maritime Univ., Dept. of Ship Electrical Power Engineering, Morska Str. 83, 81-225 Gdynia (Poland)

    2009-10-15

    Marine induction machines are exposed to various power quality disturbances appearing simultaneously in ship power systems: frequency and voltage rms value deviation, voltage unbalance and voltage waveform distortions. As a result, marine induction motors can be seriously overheated due to lowered supply voltage quality. Improvement of the protection of marine induction machines requires an appropriate method of power quality assessment and modification of the power quality regulations of ship classification societies. This paper presents an analytical model of an induction cage machine supplied with voltage of lowered quality, used in part II of the work (effect of power quality on windings temperature of marine induction motors. Part II. Results of investigations and recommendations for related regulations) for power quality assessment in ship power systems, and for justification of the new power quality regulations proposal. The presented model is suitable for implementation in an on-line measurement system. (author)

  8. Quality assurance management plan (QAPP) special analytical support (SAS)

    Energy Technology Data Exchange (ETDEWEB)

    LOCKREM, L.L.

    1999-05-20

    It is the policy of Special Analytical Support (SAS) that the analytical aspects of all environmental data generated and processed in the laboratory, subject to the Environmental Protection Agency (EPA), U.S. Department of Energy or other project specific requirements, be of known and acceptable quality. It is the intention of this QAPP to establish and assure that an effective quality controlled management system is maintained in order to meet the quality requirements of the intended use(s) of the data.

  9. Quality assurance management plan (QAPP) special analytical support (SAS)

    International Nuclear Information System (INIS)

    LOCKREM, L.L.

    1999-01-01

    It is the policy of Special Analytical Support (SAS) that the analytical aspects of all environmental data generated and processed in the laboratory, subject to the Environmental Protection Agency (EPA), U.S. Department of Energy or other project specific requirements, be of known and acceptable quality. It is the intention of this QAPP to establish and assure that an effective quality controlled management system is maintained in order to meet the quality requirements of the intended use(s) of the data

  10. THE BUSINESS PLAN – A PREREQUISITE OF FEMALE ENTREPRENEURIAL SUCCESS IN THE WESTERN PART OF ROMANIA

    Directory of Open Access Journals (Sweden)

    Botezat Elena-Aurelia

    2010-07-01

    Full Text Available It is more and more obvious that a proper planning of various activities/actions is a key of long-term success of a business organization. Writing a well grounded business plan is not easy, but nobody says that. What we can state is the fact that is worth it! Certainly no business plan guarantees success, but at least reduces the risk. And so the vulnerability can and should be reduced and kept under control. My research topic is integrated within the framework of the project called “The Entrepreneurship and the Equality of Opportunities. An Inter-Regional Model of Entrepreneurial School for Women (AntrES”, implemented in 6 counties situated on the Western border of Romania. The main objectives of my paper were to explore the chances for success of the futures business delineated in the business plans and to prove that these business plans represent a resource of the female entrepreneurship in the Western part of Romania.

  11. American Board of Radiology Maintenance of Certification-Part IV: Practice Quality Improvement for Radiation Oncology

    International Nuclear Information System (INIS)

    Kun, Larry E.; Haffty, Bruce G.; Bosma, Jennifer; Strife, Janet L.; Hattery, Robert R.

    2007-01-01

    Maintenance of Certification is a physician-based response to public concerns about the quality of medical care and physician competency in a rapidly evolving, technically demanding specialty. American Board of Radiology (ABR) has previously described the first three components of the Maintenance of Certification. The ABR is currently developing a program in practice performance, completing Part IV of the competencies. The Practice Quality Improvement (PQI) program is meant to critically evaluate meaningful aspects of a physician's practice in a simple manner, using identifiable metrics and self-assessment to include an action plan for quality improvement. Each diplomate will be expected to complete three PQI projects during a full 10-year Maintenance of Certification cycle. Current diplomates with time-limited certificates will find prorated requirements determined by their year of certification on the ABR Website. Diplomates will have the option of completing zero to two Type I PQI projects (assessing factors relevant to clinical practice by peer review and self-reporting) and one to three Type II projects (i.e., at least one Type II projects of the three required, assessing parameters of practice by comparison with evidence-based guidelines, consensus statements, or peer comparisons; Type II projects are initiated and managed by professional societies). Several examples of Type I projects that might be offered by societies or directly through the ABR are provided, as well as highlights of the two Type II projects that have sought ABR qualification: American Society for Therapeutic Radiology and Oncology's Performance Assessment for the Advancement of Radiation Oncology Treatment program and American College of Radiology's RO-PEER program. An additional objective of the PQI is to develop national databases for future reference using aggregate data from the PQI projects

  12. Quality assurance plan for Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1994-01-01

    This Quality Assurance Plan (QAP) is concerned with design and construction (Sect. 2) and characterization and monitoring (Sect. 3). The basis for Sect. 2 is the Quality Assurance Plan for the Design and Construction of Waste Area Grouping 6 Closure at Oak Ridge National Laboratory, Oak Ridge, Tennessee, and the basis for Sect. 3 is the Environmental Restoration Quality Program Plan. Combining the two areas into one plan gives a single, overall document that explains the requirements and from which the individual QAPs and quality assurance project plans can be written. The Waste Area Grouping (WAG) 6 QAP establishes the procedures and requirements to be implemented for control of quality-related activities for the WAG 6 project. Quality Assurance (QA) activities are subject to requirements detailed in the Martin Marietta Energy Systems, Inc. (Energy Systems), QA Program and the Environmental Restoration (ER) QA Program, as well as to other quality requirements. These activities may be performed by Energy Systems organizations, subcontractors to Energy Systems, and architect-engineer (A-E) under prime contract to the US Department of Energy (DOE), or a construction manager under prime contract to DOE. This plan specifies the overall Energy Systems quality requirements for the project. The WAG 6 QAP will be supplemented by subproject QAPs that will identify additional requirements pertaining to each subproject

  13. 42 CFR 423.2010 - When CMS, the IRE, or Part D plan sponsors may participate in an ALJ hearing.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 3 2010-10-01 2010-10-01 false When CMS, the IRE, or Part D plan sponsors may... PRESCRIPTION DRUG BENEFIT Reopening, ALJ Hearings, MAC review, and Judicial Review § 423.2010 When CMS, the IRE... require, CMS, the IRE, and/or the Part D plan sponsor to participate in any proceedings before the ALJ...

  14. 20 CFR 661.290 - Under what circumstances may States require Local Boards to take part in regional planning...

    Science.gov (United States)

    2010-04-01

    ... what circumstances may States require Local Boards to take part in regional planning activities? (a... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Under what circumstances may States require Local Boards to take part in regional planning activities? 661.290 Section 661.290 Employees' Benefits...

  15. Assessment of water supply system and water quality of Lighvan village using water safety plan

    Directory of Open Access Journals (Sweden)

    Mojtaba Pourakbar

    2015-12-01

    Full Text Available Background: Continuous expansion of potable water pollution sources is one of the main concerns of water suppliers, therefore measures such as water safety plan (WSP, have been taken into account to control these sources of pollution. The aim of this study was to identify probable risks and threatening hazards to drinking water quality in Lighvan village along with assessment of bank filtration of the village. Methods: In the present study all risks and probable hazards were identified and ranked. For each of these cases, practical suggestions for removing or controlling them were given. To assess potable water quality in Lighvan village, sampling was done from different parts of the village and physicochemical parameters were measured. To assess the efficiency of bank filtration system of the village, independent t test was used to compare average values of parameters in river and treated water. Results: One of the probable sources of pollution in this study was domestic wastewater which threatens water quality. The results of this study show that bank filtration efficiency in water supply of the village is acceptable. Conclusion: Although Bank filtration imposes fewer expenses on governments, it provides suitable water for drinking and other uses. However, it should be noted that application of these systems should be done after a thorough study of water pollution level, types of water pollutants, soil properties of the area, soil percolation and system distance from pollutant sources.

  16. Achieving performance breakthroughs in an HMO business process through quality planning.

    Science.gov (United States)

    Hanan, K B

    1993-01-01

    Kaiser Permanente's Georgia Region commissioned a quality planning team to design a new process to improve payments to its suppliers and vendors. The result of the team's effort was a 73 percent reduction in cycle time. This team's experiences point to the advantages of process redesign as a quality planning model, as well as some general guidelines for its most effective use in teams. If quality planning project teams are carefully configured, sufficiently expert in the existing process, and properly supported by management, organizations can achieve potentially dramatic improvements in process performance using this approach.

  17. Considerations for using data envelopment analysis for the assessment of radiotherapy treatment plan quality.

    Science.gov (United States)

    Simpson, John; Raith, Andrea; Rouse, Paul; Ehrgott, Matthias

    2017-10-09

    Purpose The operations research method of data envelopment analysis (DEA) shows promise for assessing radiotherapy treatment plan quality. The purpose of this paper is to consider the technical requirements for using DEA for plan assessment. Design/methodology/approach In total, 41 prostate treatment plans were retrospectively analysed using the DEA method. The authors investigate the impact of DEA weight restrictions with reference to the ability to differentiate plan performance at a level of clinical significance. Patient geometry influences plan quality and the authors compare differing approaches for managing patient geometry within the DEA method. Findings The input-oriented DEA method is the method of choice when performing plan analysis using the key undesirable plan metrics as the DEA inputs. When considering multiple inputs, it is necessary to constrain the DEA input weights in order to identify potential plan improvements at a level of clinical significance. All tested approaches for the consideration of patient geometry yielded consistent results. Research limitations/implications This work is based on prostate plans and individual recommendations would therefore need to be validated for other treatment sites. Notwithstanding, the method that requires both optimised DEA weights according to clinical significance and appropriate accounting for patient geometric factors is universally applicable. Practical implications DEA can potentially be used during treatment plan development to guide the planning process or alternatively used retrospectively for treatment plan quality audit. Social implications DEA is independent of the planning system platform and therefore has the potential to be used for multi-institutional quality audit. Originality/value To the authors' knowledge, this is the first published examination of the optimal approach in the use of DEA for radiotherapy treatment plan assessment.

  18. Pollution sources and groundwater quality in the Coastal region of the Yugoslav part of the Danube

    International Nuclear Information System (INIS)

    Komatina, S.

    1997-01-01

    In order to access the vulnerability and risk of the aquifer system in the Yugoslav part of the Danube, as the primary source of drinking water for a numerically substantial community, industrial purposes and irrigation, as well as a high concentration of civil, industrial and agricultural activities (hence, a potential source of pollution of the groundwater resources through land occupation and use as well as the disposal of solid and liquid wastes), a great hydro-geophysical exploration was performed. Within the lower part of the plain, exploratory test of Salinac field, near Smederevo town, was particularly investigated. The reason why is because that part is also an area of the mouth of the Velika Morava into the Danube, where Derdap reservoir is located. Task of complex exploration was to delineate the aquifer, obtain appropriate parameters (groundwater level, groundwater chemistry, clay content, filtration characteristics and physical parameters of geological functions), as well as to map the aquifer vulnerability, in order to prevent and moderate a harmful influence of the performed reservoir on the environment (increased groundwater infiltration from the reservoir into surrounding rocks, permanent groundwater level raising, etc.). Based on the results, zoning of the study area according to the aquifer vulnerability has been done. Then, land-use planning and development of strategy for groundwater protection and management was possible. In the paper, not only sources of contamination, characteristics of pollutants and their influence on the groundwater quality was presented, but also content of organic matters, phosphates and nitrogen compounds, etc. Further, means of protection and management are discussed, as well as the appropriate legal regulations. (author)

  19. Sampling Plans for Monitoring Quality Control Process at a Plastic ...

    African Journals Online (AJOL)

    This paper explores the problem of high quality cost at a medium –sized firm manufacturing various types and sizes of plastic container, using a real life data. In pursuance of their quality objectives, the company established a policy that dictates and expensive and time-consuming post-manufacturing process. While the ...

  20. A-Cell equipment removal quality process plan

    International Nuclear Information System (INIS)

    TAKASUMI, D.S.

    1999-01-01

    This document establishes the quality assuring activities used to manage the 324 building A-Cell equipment removal activity. This activity will package, remove, transport and dispose of the equipment in A-Cell. This document is provided to ensure that appropriate and effective quality assuring activities have been incorporated into the work controlling documentation and procedures

  1. Association Between Health Plan Exit From Medicaid Managed Care and Quality of Care, 2006-2014.

    Science.gov (United States)

    Ndumele, Chima D; Schpero, William L; Schlesinger, Mark J; Trivedi, Amal N

    2017-06-27

    State Medicaid programs have increasingly contracted with insurers to provide medical care services for enrollees (Medicaid managed care plans). Insurers that provide these plans can exit Medicaid programs each year, with unclear effects on quality of care and health care experiences. To determine the frequency and interstate variation of health plan exit from Medicaid managed care and evaluate the relationship between health plan exit and market-level quality. Retrospective cohort of all comprehensive Medicaid managed care plans (N = 390) during the interval 2006-2014. Plan exit, defined as the withdrawal of a managed care plan from a state's Medicaid program. Eight measures from the Healthcare Effectiveness Data and Information Set were used to construct 3 composite indicators of quality (preventive care, chronic disease care management, and maternity care). Four measures from the Consumer Assessment of Healthcare Providers and Systems were combined into a composite indicator of patient experience, reflecting the proportion of beneficiaries rating experiences as 8 or above on a 0-to-10-point scale. Outcome data were available for 248 plans (68% of plans operating prior to 2014, representing 78% of beneficiaries). Of the 366 comprehensive Medicaid managed care plans operating prior to 2014, 106 exited Medicaid. These exiting plans enrolled 4 848 310 Medicaid beneficiaries, with a mean of 606 039 beneficiaries affected by plan exits annually. Six states had a mean of greater than 10% of Medicaid managed care recipients enrolled in plans that exited, whereas 10 states experienced no plan exits. Plans that exited from a state's Medicaid market performed significantly worse prior to exiting than those that remained in terms of preventive care (57.5% vs 60.4%; difference, 2.9% [95% CI, 0.3% to 5.5%]), maternity care (69.7% vs 73.6%; difference, 3.8% [95% CI, 1.7% to 6.0%]), and patient experience (73.5% vs 74.8%; difference, 1.3% [95% CI, 0.6% to 1

  2. Underground Test Area Quality Assurance Project Plan Nevada National Security Site, Nevada, Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    Irene Farnham

    2011-05-01

    This Quality Assurance Project Plan (QAPP) provides the overall quality assurance (QA) program requirements and general quality practices to be applied to the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO) Underground Test Area (UGTA) Sub-Project (hereafter the Sub-Project) activities. The requirements in this QAPP are consistent with DOE Order 414.1C, Quality Assurance (DOE, 2005); U.S. Environmental Protection Agency (EPA) Guidance for Quality Assurance Project Plans for Modeling (EPA, 2002); and EPA Guidance on the Development, Evaluation, and Application of Environmental Models (EPA, 2009). The QAPP Revision 0 supersedes DOE--341, Underground Test Area Quality Assurance Project Plan, Nevada Test Site, Nevada, Revision 4.

  3. Quality assurance program plan for the Site Physical and Electrical Calibration Services Lab. Revision 1

    International Nuclear Information System (INIS)

    Carpenter, C.A.

    1995-01-01

    This Quality Assurance Program Plan (QAPP) is organized to address WHC's implementation of quality assurance requirements as they are presented as interpretive guidance endorsed by the Department of Energy (DOE) Field Office, Richland DOE Order 5700.6C Quality Assurance. The quality assurance requirements presented in this plan will assure Measuring and Test Equipment (M and TE) are in conformance with prescribed technical requirements and that data provided by testing, inspection, or maintenance are valid. This QAPP covers all activities and work elements that are variously called QA, quality control, and quality engineering regardless of the organization performing the work. This QAPP identifies the QA requirements for planning, control, and documentation of operations, modifications, and maintenance of the WHC Site Physical and Electrical Calibration Services Laboratory. The primary function of the WHC Site Physical and Electrical Calibration Services Laboratory is providing calibration, standardization, or repair service of M and TE

  4. Identifying shared and contested elements in climate plans as part of shaping transitions towards a Danish low carbon society

    DEFF Research Database (Denmark)

    Jørgensen, Michael Søgaard

    2011-01-01

    The Danish government's vision about Denmark as a society independent of fossil energy has initiated several Danish energy and climate action plans during 2009-2010 with visions and measures for a 30-40 year time perspective. The paper analyses differences and similarities in action plans from....... The analyses are conducted as part of a project about sustainable transitions towards a low carbon society. The plan from the renewable energy NGO is an energy plan, while the other plans are climate plans, which include non-energy related greenhouse gasses from land use changes and use of fertilizers...... in agriculture. The plans differ with respect to whether and how agricultural production and Danish food consumption should change as part of transitions towards a low carbon society. All four plans agree about a significant increase in Danish wind turbine capacity and stronger energy saving efforts in Danish...

  5. Use of plan quality degradation to evaluate tradeoffs in delivery efficiency and clinical plan metrics arising from IMRT optimizer and sequencer compromises

    Science.gov (United States)

    Wilkie, Joel R.; Matuszak, Martha M.; Feng, Mary; Moran, Jean M.; Fraass, Benedick A.

    2013-01-01

    Purpose: Plan degradation resulting from compromises made to enhance delivery efficiency is an important consideration for intensity modulated radiation therapy (IMRT) treatment plans. IMRT optimization and/or multileaf collimator (MLC) sequencing schemes can be modified to generate more efficient treatment delivery, but the effect those modifications have on plan quality is often difficult to quantify. In this work, the authors present a method for quantitative assessment of overall plan quality degradation due to tradeoffs between delivery efficiency and treatment plan quality, illustrated using comparisons between plans developed allowing different numbers of intensity levels in IMRT optimization and/or MLC sequencing for static segmental MLC IMRT plans. Methods: A plan quality degradation method to evaluate delivery efficiency and plan quality tradeoffs was developed and used to assess planning for 14 prostate and 12 head and neck patients treated with static IMRT. Plan quality was evaluated using a physician's predetermined “quality degradation” factors for relevant clinical plan metrics associated with the plan optimization strategy. Delivery efficiency and plan quality were assessed for a range of optimization and sequencing limitations. The “optimal” (baseline) plan for each case was derived using a clinical cost function with an unlimited number of intensity levels. These plans were sequenced with a clinical MLC leaf sequencer which uses >100 segments, assuring delivered intensities to be within 1% of the optimized intensity pattern. Each patient's optimal plan was also sequenced limiting the number of intensity levels (20, 10, and 5), and then separately optimized with these same numbers of intensity levels. Delivery time was measured for all plans, and direct evaluation of the tradeoffs between delivery time and plan degradation was performed. Results: When considering tradeoffs, the optimal number of intensity levels depends on the treatment

  6. Family planning services quality as a determinant of use of IUD in Egypt

    Directory of Open Access Journals (Sweden)

    Montana Livia

    2006-06-01

    Full Text Available Abstract Background Both availability and quality of family planning services are believed to have contributed to increasing contraceptive use and declining fertility rates in developing countries. Yet, there is limited empirical evidence to show the relationship between the quality of family planning services and the population based prevalence of contraceptive methods. This study examined the relationship between quality of family planning services and use of intrauterine devices (IUD in Egypt. Methods The analysis used data from the 2003 Egypt Interim Demographic and Health Survey (EIDHS that included 8,445 married women aged 15–49, and the 2002 Egypt Service Provision Assessment (ESPA survey that included 602 facilities offering family planning services. The EIDHS collected latitude and longitude coordinates of all sampled clusters, and the ESPA collected these coordinates for all sampled facilities. Using Geographic Information System (GIS methods, individual women were linked to a facility located within 10 km of their community. A facility-level index was constructed to reflect the quality of family planning services. Four dimensions of quality of care were examined: counseling, examination room, supply of contraceptive methods, and management. Effects of quality of family planning services on the use of IUD and other contraceptive methods were estimated using multinomial logistic regression. Results are presented as relative risk ratios (RRR with significance levels (p-values. Results IUD use among women who obtained their method from public sources was significantly positively associated with quality of family planning services (RRR = 1.36, p Conclusion This study is one among the few that used geographic information to link data from a population-based survey with an independently sampled health facility survey. The findings demonstrate that service quality is an important determinant of use of clinical contraceptive methods in Egypt

  7. National Energy Board 1992-93 estimates part III expenditure plan

    International Nuclear Information System (INIS)

    1992-01-01

    This Expenditure Plan is designed to be used as a reference document. As such, it contains several levels of detail to respond to the various needs of its audience. This Plan is divided into two sections. Section 1 presents an overview of the Program including a description, information on its background, objectives and planning perspective as well as performance information that forms the basis for the resources requested. Section 2 provides further information on costs and resources as well as special analyses that the reader may require to understand the Program more fully. Section 1 is preceded by details of Spending Authorities from Part 2 of the Estimates and Volume 2 of the Public Accounts. This is to provide continuity with other Estimates documents and to help in assessing the Program's financial performance over the past year. The format and organization of the document should be regarded as transitional. For the most part the document is organized to be consistent with the program structure approved for the National Energy Board. 16 figs

  8. National Energy Board 1992-93 estimates part III expenditure plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1993-12-31

    This Expenditure Plan is designed to be used as a reference document. As such, it contains several levels of detail to respond to the various needs of its audience. This Plan is divided into two sections. Section 1 presents an overview of the Program including a description, information on its background, objectives and planning perspective as well as performance information that forms the basis for the resources requested. Section 2 provides further information on costs and resources as well as special analyses that the reader may require to understand the Program more fully. Section 1 is preceded by details of Spending Authorities from Part 2 of the Estimates and Volume 2 of the Public Accounts. This is to provide continuity with other Estimates documents and to help in assessing the Program`s financial performance over the past year. The format and organization of the document should be regarded as transitional. For the most part the document is organized to be consistent with the program structure approved for the National Energy Board. 16 figs.

  9. RCRA Part A permit characterization plan for the U-2bu subsidence crater. Revision 1

    International Nuclear Information System (INIS)

    1998-04-01

    This plan presents the characterization strategy for Corrective Action Unit (CAU) 109, U-2bu Subsidence Crater (referred to as U-2bu) in Area 2 at the Nevada Test Site (NTS). The objective of the planned activities is to obtain sufficient characterization data for the crater soils and observed wastes under the conditions of the current Resource Conservation and Recovery Act (RCRA) Part A permit. The scope of the characterization plan includes collecting surface and subsurface soil samples with hand augers and for the purpose of site characterization. The sampling strategy is to characterize the study area soils and look for RCRA constituents. Observable waste soils and surrounding crater soils will be analyzed and evaluated according to RCRA closure criteria. Because of the status of the crater a RCRA Part A permit site, acquired radionuclide analyses will only be evaluated in regards to the health and safety of site workers and the disposition of wastes generated during site characterization. The U-2bu Subsidence Crater was created in 1971 by a Lawrence Livermore National Laboratory underground nuclear test, event name Miniata, and was used as a land-disposal unit for radioactive and hazardous waste from 1973 to 1988

  10. MO-B-BRB-02: Maintain the Quality of Treatment Planning for Time-Constraint Cases

    International Nuclear Information System (INIS)

    Chang, J.

    2015-01-01

    The radiotherapy treatment planning process has evolved over the years with innovations in treatment planning, treatment delivery and imaging systems. Treatment modality and simulation technologies are also rapidly improving and affecting the planning process. For example, Image-guided-radiation-therapy has been widely adopted for patient setup, leading to margin reduction and isocenter repositioning after simulation. Stereotactic Body radiation therapy (SBRT) and Radiosurgery (SRS) have gradually become the standard of care for many treatment sites, which demand a higher throughput for the treatment plans even if the number of treatments per day remains the same. Finally, simulation, planning and treatment are traditionally sequential events. However, with emerging adaptive radiotherapy, they are becoming more tightly intertwined, leading to iterative processes. Enhanced efficiency of planning is therefore becoming more critical and poses serious challenge to the treatment planning process; Lean Six Sigma approaches are being utilized increasingly to balance the competing needs for speed and quality. In this symposium we will discuss the treatment planning process and illustrate effective techniques for managing workflow. Topics will include: Planning techniques: (a) beam placement, (b) dose optimization, (c) plan evaluation (d) export to RVS. Planning workflow: (a) import images, (b) Image fusion, (c) contouring, (d) plan approval (e) plan check (f) chart check, (g) sequential and iterative process Influence of upstream and downstream operations: (a) simulation, (b) immobilization, (c) motion management, (d) QA, (e) IGRT, (f) Treatment delivery, (g) SBRT/SRS (h) adaptive planning Reduction of delay between planning steps with Lean systems due to (a) communication, (b) limited resource, (b) contour, (c) plan approval, (d) treatment. Optimizing planning processes: (a) contour validation (b) consistent planning protocol, (c) protocol/template sharing, (d) semi

  11. MO-B-BRB-02: Maintain the Quality of Treatment Planning for Time-Constraint Cases

    Energy Technology Data Exchange (ETDEWEB)

    Chang, J. [New York Weill Cornell Medical Ctr (United States)

    2015-06-15

    The radiotherapy treatment planning process has evolved over the years with innovations in treatment planning, treatment delivery and imaging systems. Treatment modality and simulation technologies are also rapidly improving and affecting the planning process. For example, Image-guided-radiation-therapy has been widely adopted for patient setup, leading to margin reduction and isocenter repositioning after simulation. Stereotactic Body radiation therapy (SBRT) and Radiosurgery (SRS) have gradually become the standard of care for many treatment sites, which demand a higher throughput for the treatment plans even if the number of treatments per day remains the same. Finally, simulation, planning and treatment are traditionally sequential events. However, with emerging adaptive radiotherapy, they are becoming more tightly intertwined, leading to iterative processes. Enhanced efficiency of planning is therefore becoming more critical and poses serious challenge to the treatment planning process; Lean Six Sigma approaches are being utilized increasingly to balance the competing needs for speed and quality. In this symposium we will discuss the treatment planning process and illustrate effective techniques for managing workflow. Topics will include: Planning techniques: (a) beam placement, (b) dose optimization, (c) plan evaluation (d) export to RVS. Planning workflow: (a) import images, (b) Image fusion, (c) contouring, (d) plan approval (e) plan check (f) chart check, (g) sequential and iterative process Influence of upstream and downstream operations: (a) simulation, (b) immobilization, (c) motion management, (d) QA, (e) IGRT, (f) Treatment delivery, (g) SBRT/SRS (h) adaptive planning Reduction of delay between planning steps with Lean systems due to (a) communication, (b) limited resource, (b) contour, (c) plan approval, (d) treatment. Optimizing planning processes: (a) contour validation (b) consistent planning protocol, (c) protocol/template sharing, (d) semi

  12. International Thermonuclear Experimental Reactor U.S. Home Team Quality Assurance Plan

    Energy Technology Data Exchange (ETDEWEB)

    Sowder, W. K.

    1998-10-01

    The International Thermonuclear Experimental Reactor (ITER) project is unique in that the work is divided among an international Joint Central Team and four Home Teams, with the overall responsibility for the quality of activities performed during the project residing with the ITER Director. The ultimate responsibility for the adequacy of work performed on tasks assigned to the U.S. Home Team resides with the U.S. Home Team Leader and the U.S. Department of Energy Office of Fusion Energy (DOE-OFE). This document constitutes the quality assurance plan for the ITER U.S. Home Team. This plan describes the controls exercised by U.S. Home Team management and the Performing Institutions to ensure the quality of tasks performed and the data developed for the Engineering Design Activities assigned to the U.S. Home Team and, in particular, the Research and Development Large Projects (7). This plan addresses the DOE quality assurance requirements of 10 CFR 830.120, "Quality Assurance." The plan also describes U.S. Home Team quality commitments to the ITER Quality Assurance Program. The ITER Quality Assurance Program is based on the principles described in the International Atomic Energy Agency Standard No. 50-C-QA, "Quality Assurance for Safety in Nuclear Power Plants and Other Nuclear Facilities." Each commitment is supported with preferred implementation methodology that will be used in evaluating the task quality plans to be submitted by the Performing Institutions. The implementing provisions of the program are based on guidance provided in American National Standards Institute/American Society of Mechanical Engineers NQA-1 1994, "Quality Assurance." The individual Performing Institutions will implement the appropriate quality program provisions through their own established quality plans that have been reviewed and found to comply with U.S. Home Team quality assurance plan commitments to the ITER Quality Assurance Program. The extent of quality program provisions

  13. Choosing Pre-conception Planning for Women/Families: Counselling and Informed Consent (Part 2) - Pre-conception Reproductive Planning, Lifestyle, Immunization, and Psychosocial Issues.

    Science.gov (United States)

    Wilson, R Douglas

    2017-12-06

    To inform reproductive and other health care providers about pre-conception evaluation, including considerations for reproductive planning, lifestyle modification, immunization status and attitudes, and psychosocial issues. This counselling information can be used for patient education and planning and possible pre-conception and/or prenatal testing. This information may allow for improved risk assessment when pre-conception counselling for individual patients and their families is used. CONSIDERATIONS FOR PRE-CONCEPTION CARE (PART 2) REGARDING PRE-CONCEPTION REPRODUCTIVE PLANNING, LIFESTYLE, IMMUNIZATIONS, AND PSYCHOSOCIAL ISSUES: CONSIDERATION FOR CARE STATEMENTS: For this review article, the Consideration for Care Statements use the Grading of Recommendations, Assessment, Development and Evaluations strength and quality principles because they are comparable for the clinician and the patient/public user. For example, "Strong" for clinicians is defined as "the recommendation would apply to most individuals. Formal discussion aids are not likely to be needed to help individuals make decisions consistent with their values and preferences." For patients/the public, "Strong" is defined as, "we believe most people in this situation would want the recommended course of actions and only a small number would not." Quality of evidence (High, Moderate, Low) is based on the confidence that the true effect lies close to that of the estimate of the effect. In addition, the Canadian Task Force on Preventive Health Care key to evidence statements and grading of recommendations are included. PubMed, Medline, and the Cochrane Database were searched until May 2017, using appropriate key words (i.e., preconception, reproductive planning, lifestyle modification, immunization risks and benefits, psychosocial pregnancy factors/issues). Grey (unpublished) literature was identified through searching websites of health technology assessment and health technology assessment

  14. Quality assurance for online adapted treatment plans: Benchmarking and delivery monitoring simulation

    International Nuclear Information System (INIS)

    Li, Taoran; Wu, Qiuwen; Yang, Yun; Rodrigues, Anna; Yin, Fang-Fang; Jackie Wu, Q.

    2015-01-01

    Purpose: An important challenge facing online adaptive radiation therapy is the development of feasible and efficient quality assurance (QA). This project aimed to validate the deliverability of online adapted plans and develop a proof-of-concept online delivery monitoring system for online adaptive radiation therapy QA. Methods: The first part of this project benchmarked automatically online adapted prostate treatment plans using traditional portal dosimetry IMRT QA. The portal dosimetry QA results of online adapted plans were compared to original (unadapted) plans as well as randomly selected prostate IMRT plans from our clinic. In the second part, an online delivery monitoring system was designed and validated via a simulated treatment with intentional multileaf collimator (MLC) errors. This system was based on inputs from the dynamic machine information (DMI), which continuously reports actual MLC positions and machine monitor units (MUs) at intervals of 50 ms or less during delivery. Based on the DMI, the system performed two levels of monitoring/verification during the delivery: (1) dynamic monitoring of cumulative fluence errors resulting from leaf position deviations and visualization using fluence error maps (FEMs); and (2) verification of MLC positions against the treatment plan for potential errors in MLC motion and data transfer at each control point. Validation of the online delivery monitoring system was performed by introducing intentional systematic MLC errors (ranging from 0.5 to 2 mm) to the DMI files for both leaf banks. These DMI files were analyzed by the proposed system to evaluate the system’s performance in quantifying errors and revealing the source of errors, as well as to understand patterns in the FEMs. In addition, FEMs from 210 actual prostate IMRT beams were analyzed using the proposed system to further validate its ability to catch and identify errors, as well as establish error magnitude baselines for prostate IMRT delivery

  15. Quality assurance for online adapted treatment plans: Benchmarking and delivery monitoring simulation

    Energy Technology Data Exchange (ETDEWEB)

    Li, Taoran, E-mail: taoran.li.duke@gmail.com; Wu, Qiuwen; Yang, Yun; Rodrigues, Anna; Yin, Fang-Fang; Jackie Wu, Q. [Department of Radiation Oncology, Duke University Medical Center Durham, North Carolina 27710 (United States)

    2015-01-15

    Purpose: An important challenge facing online adaptive radiation therapy is the development of feasible and efficient quality assurance (QA). This project aimed to validate the deliverability of online adapted plans and develop a proof-of-concept online delivery monitoring system for online adaptive radiation therapy QA. Methods: The first part of this project benchmarked automatically online adapted prostate treatment plans using traditional portal dosimetry IMRT QA. The portal dosimetry QA results of online adapted plans were compared to original (unadapted) plans as well as randomly selected prostate IMRT plans from our clinic. In the second part, an online delivery monitoring system was designed and validated via a simulated treatment with intentional multileaf collimator (MLC) errors. This system was based on inputs from the dynamic machine information (DMI), which continuously reports actual MLC positions and machine monitor units (MUs) at intervals of 50 ms or less during delivery. Based on the DMI, the system performed two levels of monitoring/verification during the delivery: (1) dynamic monitoring of cumulative fluence errors resulting from leaf position deviations and visualization using fluence error maps (FEMs); and (2) verification of MLC positions against the treatment plan for potential errors in MLC motion and data transfer at each control point. Validation of the online delivery monitoring system was performed by introducing intentional systematic MLC errors (ranging from 0.5 to 2 mm) to the DMI files for both leaf banks. These DMI files were analyzed by the proposed system to evaluate the system’s performance in quantifying errors and revealing the source of errors, as well as to understand patterns in the FEMs. In addition, FEMs from 210 actual prostate IMRT beams were analyzed using the proposed system to further validate its ability to catch and identify errors, as well as establish error magnitude baselines for prostate IMRT delivery

  16. Quality assurance for online adapted treatment plans: benchmarking and delivery monitoring simulation.

    Science.gov (United States)

    Li, Taoran; Wu, Qiuwen; Yang, Yun; Rodrigues, Anna; Yin, Fang-Fang; Jackie Wu, Q

    2015-01-01

    An important challenge facing online adaptive radiation therapy is the development of feasible and efficient quality assurance (QA). This project aimed to validate the deliverability of online adapted plans and develop a proof-of-concept online delivery monitoring system for online adaptive radiation therapy QA. The first part of this project benchmarked automatically online adapted prostate treatment plans using traditional portal dosimetry IMRT QA. The portal dosimetry QA results of online adapted plans were compared to original (unadapted) plans as well as randomly selected prostate IMRT plans from our clinic. In the second part, an online delivery monitoring system was designed and validated via a simulated treatment with intentional multileaf collimator (MLC) errors. This system was based on inputs from the dynamic machine information (DMI), which continuously reports actual MLC positions and machine monitor units (MUs) at intervals of 50 ms or less during delivery. Based on the DMI, the system performed two levels of monitoring/verification during the delivery: (1) dynamic monitoring of cumulative fluence errors resulting from leaf position deviations and visualization using fluence error maps (FEMs); and (2) verification of MLC positions against the treatment plan for potential errors in MLC motion and data transfer at each control point. Validation of the online delivery monitoring system was performed by introducing intentional systematic MLC errors (ranging from 0.5 to 2 mm) to the DMI files for both leaf banks. These DMI files were analyzed by the proposed system to evaluate the system's performance in quantifying errors and revealing the source of errors, as well as to understand patterns in the FEMs. In addition, FEMs from 210 actual prostate IMRT beams were analyzed using the proposed system to further validate its ability to catch and identify errors, as well as establish error magnitude baselines for prostate IMRT delivery. Online adapted plans were

  17. Quality assurance program plan for the Reactor Research Experiment Programs (RREP)

    International Nuclear Information System (INIS)

    Pipher, D.G.

    1982-05-01

    This document describes the Quality Assurance Program plans which will be applied to tasks on Reactor Research Experiments performed on Sandia National Laboratories' reactors. The program provides for individual project or experiment quality plan development and allows for reasonable plan flexibility and maximum plan visibility. Various controls and requirements in this program plan are considered mandatory on all features which are identified as important to public health and safety (Level I). It is the intent of this document that the Quality Assurance program comprise those elements which will provide adequate assurance that all components, equipment, and systems of the experiments will perform as designed, and hence prevent delays and costs due to rejections or failures

  18. Analyzing the quality robustness of chemotherapy plans with respect to model uncertainties.

    Science.gov (United States)

    Hoffmann, Anna; Scherrer, Alexander; Küfer, Karl-Heinz

    2015-01-01

    Mathematical models of chemotherapy planning problems contain various biomedical parameters, whose values are difficult to quantify and thus subject to some uncertainty. This uncertainty propagates into the therapy plans computed on these models, which poses the question of robustness to the expected therapy quality. This work introduces a combined approach for analyzing the quality robustness of plans in terms of dosing levels with respect to model uncertainties in chemotherapy planning. It uses concepts from multi-criteria decision making for studying parameters related to the balancing between the different therapy goals, and concepts from sensitivity analysis for the examination of parameters describing the underlying biomedical processes and their interplay. This approach allows for a profound assessment of a therapy plan, how stable its quality is with respect to parametric changes in the used mathematical model. Copyright © 2014 Elsevier Inc. All rights reserved.

  19. VERIFICATION TESTING OF AIR POLLUTION CONTROL TECHNOLOGY QUALITY MANAGEMENT PLAN

    Science.gov (United States)

    This document is the basis for quality assurance for the Air Pollution Control Technology Verification Center (APCT Center) operated under the U.S. Environmental Protection Agency (EPA). It describes the policies, organizational structure, responsibilities, procedures, and qualit...

  20. Master Pump Shutdown MPS Software Quality Assurance Plan (SQAP)

    International Nuclear Information System (INIS)

    BEVINS, R.R.

    2000-01-01

    The MPSS Software Quality Assurance (SQAP) describes the tools and strategy used in the development of the MPSS software. The document also describes the methodology for controlling and managing changes to the software

  1. Work Plan for a Water Quality Model of Florida Bay

    National Research Council Canada - National Science Library

    Dortch, Mark

    1997-01-01

    .... The model is required to address issues pertaining to nutrient inputs and associated impacts on water quality and sea grass, particularly as related to changes in freshwater inflows from south...

  2. sampling plans for monitoring quality control process at a plastic

    African Journals Online (AJOL)

    Dr Obe

    AT A PLASTIC MANUFACTURING FIRM IN NIGERIA: A CASE STUDY. By. E.A. Onyeagoro ... manufacture similar products, so that each company ... monitoring of production to maintain process ... concept of designing quality into product, with.

  3. The university library in social networks: planning a quality presence

    Directory of Open Access Journals (Sweden)

    Estela Carmen Andrade Andrade

    2011-02-01

    Full Text Available Talks about the feasibility of participation of university libraries in social networking. We present the benefits and opportunities of Web 2.0 and online communities. Poses a set of guidelines aimed at developing a work plan that enables the implementation of site information in a social network. It highlights the capabilities of librarians to optimize this type of service.

  4. Guide for Developing High-Quality School Emergency Operations Plans

    Science.gov (United States)

    Office of Safe and Healthy Students, US Department of Education, 2013

    2013-01-01

    Each school day, our nation's schools are entrusted to provide a safe and healthy learning environment for approximately 55 million elementary and secondary school students in public and nonpublic schools. In collaboration with their local government and community partners, schools can take steps to plan for these potential emergencies through the…

  5. Transmission investment and planning in deregulated market environment : a literature survey (part 2)

    International Nuclear Information System (INIS)

    Wen, F.; Wu, F.F.

    2005-01-01

    This paper is the second half of a 2-part paper that provided details of a comprehensive survey of issues related to transmission investment and expansion planning in the electricity market. Results of the survey suggested that transmission regulation is needed to provide a fair playing field for competition and to ensure that transmission networks are optimally expanded while also meeting reliability constraints. Regulations will create further incentives for cost reduction while ensuring that regulated firms have assurance of cost recovery. Transmission planning should be controlled or monitored by a government organization or regulator. Legislation is needed to ensure that regulatory authorities can enforce reliability criteria. Mandatory reliability standards and metrics for reliability services should be implemented. The economic benefits of transmission expansion in a deregulated market should be modelled using non-deterministic approaches. It was concluded that transmission expansion plans should be able to meet future transmission capacity requirements, secure returns on investment, and ensure reliability levels for customers. Various international transmission expansion plans were also provided. 38 refs

  6. Neurocognition and quality of life after reinitiating antiretroviral therapy in children randomized to planned treatment interruption

    NARCIS (Netherlands)

    Ananworanich, Jintanat; Melvin, Diane; Amador, Jose T. R.; Childs, Tristan; Medin, Gabriela; Boscolo, Valentina; Compagnucci, Alexandra; Kanjanavanit, Suparat; Montero, Samuel; Gibb, Diana M.; Aboulker, J. -P.; Babiker, A.; Belfrage, E.; Bernardi, S.; Bologna, R.; Burger, D.; Butler, K.; Castelli-Gattinara, G.; Castro, H.; Clayden, P.; Compagnucci, A.; Cressey, T.; Darbyshire, J. H.; Debré, M.; de Groot, R.; della Negra, M.; Di Biagio, A.; de Rossi, A.; Duicelescu, D.; Faye, A.; Giaquinto, C.; Giacomet, V.; Gibb, D. M.; Grosch-Wörner, I.; Hainault, M.; Klein, N.; Lallemant, M.; Levy, J.; Lyall, H.; Marczynska, M.; Marques, L.; Mardarescu, M.; Mellado Peña, M. J.; Nadal, D.; Nastouli, E.; Naver, L.; Niehues, T.; Peckham, C.; Pillay, D.; Popieska, J.; Ramos Amador, J. T.; Rojo Conejo, P.; Rosado, L.; Rosso, R.; Rudin, C.; Scherpbier, H. J.; Sharland, M.; Stevanovic, M.; Thorne, C.; Tovo, P. A.; Tudor-Williams, G.; Turkova, A.; Valerius, N.; Volokha, A.; Walker, A. S.; Welch, S.; Wintergerst, U.; Aboulker, J. P.; Burger, D. M.; Green, H.; Harper, L.; Mofenson, L.; Moye, J.; Saïdi, Y.; Cressey, T. R.; Jacqz-Aigrain, E.; Khoo, S.; Regazzi, M.; Tréluyer, J. M.; Ngo-Giang-Huong, N.; Muñoz Fernandez, M. A.; Hill, C.; Lepage, P.; Pozniak, A.; Vella, S.; Chêne, G.; Vesikari, T.; Hadjou, G.; Léonardo, S.; Riault, Y.; Bleier, J.; Buck, L.; Duong, T.; Farrelly, L.; Forcat, S.; Harrison, L.; Horton, J.; Johnson, D.; Montero, S.; Taylor, C.; Chalermpantmetagul, S.; Peongjakta, R.; Khamjakkaew, W.; Than-in-at, K.; Chailert, S.; Jourdain, G.; Le Coeur, S.; Floret, D.; Costanzo, P.; Le Thi, T. T.; Monpoux, F.; Mellul, S.; Caranta, I.; Boudjoudi, N.; Firtion, G.; Denon, M.; Charlemaine, E.; Picard, F.; Hellier, E.; Heuninck, C.; Damond, F.; Alexandre, G.; Tricoire, J.; Antras, M.; Lachendowier, C.; Nicot, F.; Krivine, A.; Rivaux, D.; Notheis, G.; Strotmann, G.; Schlieben, S.; Rampon, O.; Boscolo, V.; Zanchetta, M.; Ginocchio, F.; Viscoli, C.; Martino, A.; Pontrelli, G.; Baldassar, S.; Concato, C.; Mazza, A.; Rossetti, G.; Dobosz, S.; Oldakowska, A.; Popielska, J.; Kaflik, M.; Stanczak, J.; Stanczack, G.; Dyda, T.; Kruk, M.; González Tomé, M. I.; Delgado García, R.; Fernandez Gonzalez, M. T.; Medin, G.; Mellado Peña, M. José; Martín Fontelos, P.; Garcia Mellado, M. I.; Medina, A. F.; Ascencion, B.; Garcia Bermejo, I.; Navarro Gomez, D. M. L.; Saavedra, J.; Prieto, C.; Jimenez, J. L.; Muñoz-Fernandez, M. A.; Garcia Torre, A.; de José Gómez, M. I.; García Rodriguez, M. C.; Moreno Pérez, D.; Núñez Cuadros, E.; Asensi-Botet, F.; Otero Reigada, C.; Pérez Tamarit, M. D.; Vilalta, R.; Molina Moreno, J. M.; Rainer, Truninger; Schupbach, J.; Rutishauser, M.; Bunupuradah, T.; Butterworth, O.; Phasomsap, C.; Prasitsuebsai, W.; Chuanjaroen, T.; Jupimai, T.; Ubolyam, S.; Phanuphak, P.; Puthanakit, T.; Pancharoen, C.; Mai, Chaing; Kanjanavanit, S.; Namwong, T.; Punsakoon, W.; Payakachat, S.; Chutima, D.; Raksasang, M.; Foster, C.; Hamadache, D.; Campbell, S.; Newbould, C.; Monrose, C.; Abdulla, A.; Walley, A.; Melvin, D.; Patel, D.; Kaye, S.; Seery, P.; Rankin, A.; Wildfire, A.; Novelli, V.; Shingadia, D.; Moshal, K.; Flynn, J.; Clapson, M.; Allen, A.; Spencer, L.; Rackstraw, C.; Ward, B.; Parkes, K.; Depala, M.; Jacobsen, M.; Poulsom, H.; Barkley, L.; Miah, J.; Lurie, P.; Keane, C.; McMaster, P.; Phipps, M.; Orendi, J.; Farmer, C.; Liebeschuetz, S.; Sodeinde, O.; Wong, S.; Bostock, V.; Heath, Y.; Scott, S.; Gandhi, K.; Lewis, P.; Daglish, J.; Miles, K.; Summerhill, L.; Subramaniam, B.; Weiner, L.; Famiglietti, M.; Rana, S.; Yu, P.; Roa, J.; Puga, A.; Haerry, A.

    2016-01-01

    Objective: Understanding the effects of antiretroviral treatment (ART) interruption on neurocognition and quality of life (QoL) are important for managing unplanned interruptions and planned interruptions in HIV cure research. Design: Children previously randomized to continuous (continuous ART, n =

  7. 77 FR 59090 - Approval and Promulgation of Air Quality Implementation Plans; Pennsylvania; Adhesives and...

    Science.gov (United States)

    2012-09-26

    ... Promulgation of Air Quality Implementation Plans; Pennsylvania; Adhesives and Sealants Rule AGENCY... manufacture, sale, use, or application of adhesives, sealants, primers, and solvents. The SIP revision also... proposed rulemaking (NPR) which proposed approval of Pennsylvania's adhesives and sealants regulations in...

  8. 76 FR 79537 - Approval and Promulgation of Air Quality Implementation Plans; Delaware; Adhesives and Sealants Rule

    Science.gov (United States)

    2011-12-22

    ... Promulgation of Air Quality Implementation Plans; Delaware; Adhesives and Sealants Rule AGENCY: Environmental..., sale, use, or application of adhesives, sealants, primers, and solvents. EPA is approving this SIP... miscellaneous industrial adhesives control techniques guideline (CTG) category in accordance with the...

  9. Integrated corridor management initiative : demonstration phase evaluation, San Diego air quality test plan.

    Science.gov (United States)

    2012-08-01

    This report presents the test plan for conducting the Air Quality Analysis for the United States Department of Transportation (U.S. DOT) evaluation of the San Diego Integrated Corridor Management (ICM) Initiative Demonstration. The ICM projects being...

  10. Integrated corridor management initiative : demonstration phase evaluation, Dallas air quality test plan.

    Science.gov (United States)

    2012-08-01

    This report presents the test plan for conducting the Air Quality Analysis for the United States : Department of Transportation (U.S. DOT) evaluation of the Dallas U.S. 75 Integrated Corridor : Management (ICM) Initiative Demonstration. The ICM proje...

  11. 76 FR 42612 - Approval and Promulgation of Air Quality Implementation Plans; Vermont; Reasonably Available...

    Science.gov (United States)

    2011-07-19

    ... and Promulgation of Air Quality Implementation Plans; Vermont; Reasonably Available Control Technology... a demonstration that VT meets the requirements of reasonably available control technology (RACT) for... regulation; and new requirements for wood furniture manufacturing operations. Additionally, EPA is proposing...

  12. Quality assurance program plan for FRG sealed isotopic heat sources project (C-229)

    International Nuclear Information System (INIS)

    Tanke, J.M.

    1997-01-01

    This QAPP implements the Quality Assurance Program Plan for the FRG Sealed Isotopic Heat Sources Project (C-229). The heat source will be relocated from the 324 Building and placed in interim storage at the Central Waste Complex (CWC)

  13. 75 FR 22047 - Approval and Promulgation of Implementation Plans and Designation of Areas for Air Quality...

    Science.gov (United States)

    2010-04-27

    ... situation worse. Retroactive relief would likely impose large costs on the States, which would face fines... air quality modeling; and provide for public and local agency participation in planning and emission...

  14. 75 FR 50730 - Approval and Promulgation of Air Quality Implementation Plans; Indiana; Transportation Conformity...

    Science.gov (United States)

    2010-08-17

    ... Promulgation of Air Quality Implementation Plans; Indiana; Transportation Conformity Consultation Requirement... consists of transportation conformity criteria and procedures related to interagency consultation and... meet a requirement of the Clean Air Act and Transportation Conformity regulations. DATES: Comments must...

  15. Stakeholders and Tourism Education. Curriculum Planning Using a Quality Management Framework.

    Science.gov (United States)

    Cooper, Chris; Westlake, John

    1998-01-01

    Stakeholder analysis provides insights useful in the educational process for tourism and hospitality education. Stakeholders can influence (1) strategic direction through curriculum planning and (2) measurement of performance through quality management. (SK)

  16. TU-FG-201-10: Quality Management of Accelerated Partial Breast Irradiation (APBI) Plans

    International Nuclear Information System (INIS)

    Ji, H; Lorio, V; Cernica, G; Han, J; Nurhussien, M; Nasr, N; Hong, R

    2016-01-01

    Purpose: Since 2008, over 700 patients received high dose rate (HDR) APBI treatment at Virginia Hospital Center. The complexity involved in the planning process demonstrated a broad variation between patient geometry across all applicators, in relation to anatomical regions of interest. A quality management program instituting various metrics was implemented in March 2013 with the goal of ensuring an optimal plan is achieved for each patient. Methods: For each plan, an in-house complexity index, geometric conformity index, and plan quality index were defined. These indices were obtained for all patients treated. For patients treated after the implementation, the conformity index and quality index were maximized while other dosimetric limits, such as maximum skin and rib doses, were strictly kept. Subsequently, all evaluation parameters and applicator information were placed in a database for cross-evaluation with similar complexity. Results: Both the conformity and quality indices show good correlation with the complexity index. They decrease as complexity increases for all applicators. Multi lumen type balloon applicators demonstrate a minimal advantage over single lumen applicators in increasingly complex patient geometries, as compared to SAVI applicators which showed considerably greater advantage in these circumstances. After the implementation of the in-house planning protocol, there is a direct improvement of quality for SAVI plans. Conclusion: Due to their interstitial nature, SAVI devices show a better conformity in comparison to balloon-based devices regardless of the number of lumens, especially in complex cases. The quality management program focuses on optimizing indices by utilizing prior planning knowledge based on complexity levels. The database of indices assists in decision making and has subsequently aided in balancing the experience level among planners. This approach has made APBI planning more robust for patient care, with a measurable

  17. TU-FG-201-10: Quality Management of Accelerated Partial Breast Irradiation (APBI) Plans

    Energy Technology Data Exchange (ETDEWEB)

    Ji, H; Lorio, V; Cernica, G [Associates In Medical Physics, Lanham, MD (United States); Virginia Hospital Center, Arlington, VA (United States); Han, J; Nurhussien, M; Nasr, N; Hong, R [Virginia Hospital Center, Arlington, VA (United States)

    2016-06-15

    Purpose: Since 2008, over 700 patients received high dose rate (HDR) APBI treatment at Virginia Hospital Center. The complexity involved in the planning process demonstrated a broad variation between patient geometry across all applicators, in relation to anatomical regions of interest. A quality management program instituting various metrics was implemented in March 2013 with the goal of ensuring an optimal plan is achieved for each patient. Methods: For each plan, an in-house complexity index, geometric conformity index, and plan quality index were defined. These indices were obtained for all patients treated. For patients treated after the implementation, the conformity index and quality index were maximized while other dosimetric limits, such as maximum skin and rib doses, were strictly kept. Subsequently, all evaluation parameters and applicator information were placed in a database for cross-evaluation with similar complexity. Results: Both the conformity and quality indices show good correlation with the complexity index. They decrease as complexity increases for all applicators. Multi lumen type balloon applicators demonstrate a minimal advantage over single lumen applicators in increasingly complex patient geometries, as compared to SAVI applicators which showed considerably greater advantage in these circumstances. After the implementation of the in-house planning protocol, there is a direct improvement of quality for SAVI plans. Conclusion: Due to their interstitial nature, SAVI devices show a better conformity in comparison to balloon-based devices regardless of the number of lumens, especially in complex cases. The quality management program focuses on optimizing indices by utilizing prior planning knowledge based on complexity levels. The database of indices assists in decision making and has subsequently aided in balancing the experience level among planners. This approach has made APBI planning more robust for patient care, with a measurable

  18. SU-E-T-654: Quantifying Plan Quality Can Effectively Distinguish Between Competing Equivocal IMRT Prostate Plans

    International Nuclear Information System (INIS)

    Price, A; Lo, J; Das, S

    2015-01-01

    Purpose: The purpose of this study was to create a prostate IMRT plan quality index (PQI) that may be used to quantitatively compare competing plans using a methodology that mimics physician preference. This methodology allows planners to choose between plans with equivocal characteristics, prior to physician scrutiny. Methods: An observer study was conducted to gather data from 3 radiation oncology physicians who ranked a set of 20 patients (each with 5 plans). The rankings were used to optimize a PQI that combined weighted portions of the rectum, bladder, and planning target volume DVHs, such that the relative PQI mimicked physician rankings as best as possible. Once optimized, a test study assessed the PQI by comparison to physician rankings in a new set of 25 patients (each with 4 plans). The physician group in the test study included 6 physicians, 5 of whom were not included in the modeling study. PQI scores were evaluated against the physicians’ rank list using Spearman rank correlation. Results: The optimized plan quality index combined the following DVH features: high dose regions above 40Gy/60Gy (rectum/bladder), organ weightings, and PTV shoulder coverage. Mean correlation of the PQI vs. physicians’ rankings in the modeling study was 0.507 (range: 0.345–0.706). By comparison, the mean correlation between physicians was 0.301 (range: 0.242–0.334). The mean correlation of the PQI vs. physician rankings in test study was 0.726 (range: 0.416–0.936), indicating robustness of the PQI by virtue of producing similar results to the modeling study. Intra-physician correlation was 0.564 (range: 0.398–0.689). Conclusion: The correlation coefficients of the PQI vs. physicians were similar to the correlation coefficients of the physicians with each other, implying that the PQI developed in this work shows promise in reflecting physician clinical preference when selecting between competing, dosimetrically equivocal plans

  19. Protocol for quality control of scanners used in the simulation of radiotherapy treatment planning

    International Nuclear Information System (INIS)

    Yanes, Yaima; Alfonso, Rodolfo; Silvestre, Ileana

    2009-01-01

    Computed Tomography (CT) has become the tool fundamental imaging of modern radiation therapy, to locate targets and critical organs and dose planning. Tomographs used for these purposes require strict assurance program quality, which differs in many aspects of monitoring required for diagnostic use only with intention. The aim of this work has been the design and validation of a quality control protocol applicable to any TAC used for simulation, radiotherapy planning. (author)

  20. A planning quality evaluation tool for prostate adaptive IMRT based on machine learning

    International Nuclear Information System (INIS)

    Zhu Xiaofeng; Ge Yaorong; Li Taoran; Thongphiew, Danthai; Yin Fangfang; Wu, Q Jackie

    2011-01-01

    Purpose: To ensure plan quality for adaptive IMRT of the prostate, we developed a quantitative evaluation tool using a machine learning approach. This tool generates dose volume histograms (DVHs) of organs-at-risk (OARs) based on prior plans as a reference, to be compared with the adaptive plan derived from fluence map deformation. Methods: Under the same configuration using seven-field 15 MV photon beams, DVHs of OARs (bladder and rectum) were estimated based on anatomical information of the patient and a model learned from a database of high quality prior plans. In this study, the anatomical information was characterized by the organ volumes and distance-to-target histogram (DTH). The database consists of 198 high quality prostate plans and was validated with 14 cases outside the training pool. Principal component analysis (PCA) was applied to DVHs and DTHs to quantify their salient features. Then, support vector regression (SVR) was implemented to establish the correlation between the features of the DVH and the anatomical information. Results: DVH/DTH curves could be characterized sufficiently just using only two or three truncated principal components, thus, patient anatomical information was quantified with reduced numbers of variables. The evaluation of the model using the test data set demonstrated its accuracy ∼80% in prediction and effectiveness in improving ART planning quality. Conclusions: An adaptive IMRT plan quality evaluation tool based on machine learning has been developed, which estimates OAR sparing and provides reference in evaluating ART.

  1. National Ignition Facility quality assurance plan for laser materials and optical technology

    International Nuclear Information System (INIS)

    Wolfe, C.R.

    1996-05-01

    Quality achievement is the responsibility of the line organizations of the National Ignition Facility (NIF) Project. This subtier Quality Assurance Plan (QAP) applies to activities of the Laser Materials ampersand Optical Technology (LM ampersand OT) organization and its subcontractors. It responds to the NIF Quality Assurance Program Plan (QAPP, L-15958-2, NIF-95-499) and Department of Energy (DOE) Order 5700.6C. This Plan is organized according to 10 Quality Assurance (QA) criteria and subelements of a management system as outlined in the NIF QAPP. This Plan describes how those QA requirements are met. This Plan is authorized by the Associate Project Leader for the LM ampersand OT organization, who has assigned responsibility to the Optics QA engineer to maintain this plan, with the assistance of the NIF QA organization. This Plan governs quality-affecting activities associated with: design; procurement; fabrication; testing and acceptance; handling and storage; and installation of NIF Project optical components into mounts and subassemblies

  2. CT angiography for planning transcatheter aortic valve replacement using automated tube voltage selection: Image quality and radiation exposure

    Energy Technology Data Exchange (ETDEWEB)

    Mangold, Stefanie [Division of Cardiovascular Imaging, Department of Radiology and Radiological Science, Medical University of South Carolina, Charleston, SC (United States); Department of Diagnostic and Interventional Radiology, Eberhard-Karls University Tuebingen, Tuebingen (Germany); De Cecco, Carlo N. [Division of Cardiovascular Imaging, Department of Radiology and Radiological Science, Medical University of South Carolina, Charleston, SC (United States); Schoepf, U. Joseph, E-mail: schoepf@musc.edu [Division of Cardiovascular Imaging, Department of Radiology and Radiological Science, Medical University of South Carolina, Charleston, SC (United States); Division of Cardiology, Department of Medicine, Medical University of South Carolina, Charleston, SC (United States); Kuhlman, Taylor S.; Varga-Szemes, Akos [Division of Cardiovascular Imaging, Department of Radiology and Radiological Science, Medical University of South Carolina, Charleston, SC (United States); Caruso, Damiano [Division of Cardiovascular Imaging, Department of Radiology and Radiological Science, Medical University of South Carolina, Charleston, SC (United States); Department of Radiological Sciences, Oncology and Pathology, University of Rome “Sapienza”, Rome (Italy); Duguay, Taylor M. [Division of Cardiovascular Imaging, Department of Radiology and Radiological Science, Medical University of South Carolina, Charleston, SC (United States); Tesche, Christian [Department of Cardiology, Heart Centre Munich-Bogenhausen, Munich (Germany); Vogl, Thomas J. [Division of Cardiovascular Imaging, Department of Radiology and Radiological Science, Medical University of South Carolina, Charleston, SC (United States); Department of Diagnostic and Interventional Radiology, University Hospital Frankfurt, Frankfurt (Germany); Nikolaou, Konstantin [Department of Diagnostic and Interventional Radiology, Eberhard-Karls University Tuebingen, Tuebingen (Germany); and others

    2017-01-15

    Highlights: • TAVR-planning CT was performed with automated tube voltage selection. • Automated tube voltage selection enables individual tube voltage adaptation. • Image quality was diagnostic while radiation exposure was significantly decreased. - Abstract: Purpose: To assess image quality and accuracy of CT angiography (CTA) for transcatheter aortic valve replacement (TAVR) planning performed with 3rd generation dual-source CT (DSCT). Material and methods: We evaluated 125 patients who underwent TAVR-planning CTA on 3rd generation DSCT. A two-part protocol was performed including retrospectively ECG-gated coronary CTA (CCTA) and prospectively ECG-triggered aortoiliac CTA using 60 mL of contrast medium. Automated tube voltage selection and advanced iterative reconstruction were applied. Effective dose (ED), signal-to-noise (SNR) and contrast-to-noise ratios (CNR) were calculated. Five-point scales were used for subjective image quality analysis. In patients who underwent TAVR, sizing parameters were obtained. Results: Image quality was rated good to excellent in 97.6% of CCTA and 100% of aortoiliac CTAs. CTA studies at >100 kV showed decreased objective image quality compared to 70–100 kV (SNR, all p ≤ 0.0459; CNR, all p ≤ 0.0462). Mean ED increased continuously from 70 to >100 kV (CCTA: 4.5 ± 1.7 mSv–13.6 ± 2.9 mSv, all p ≤ 0.0233; aortoiliac CTA: 2.4 ± 0.9 mSv–6.8 ± 2.7 mSv, all p ≤ 0.0414). In 39 patients TAVR was performed and annulus diameter was within the recommended range in all patients. No severe cardiac or vascular complications were noted. Conclusion: 3rd generation DSCT provides diagnostic image quality in TAVR-planning CTA and facilitates reliable assessment of TAVR device and delivery option while reducing radiation dose.

  3. CT angiography for planning transcatheter aortic valve replacement using automated tube voltage selection: Image quality and radiation exposure

    International Nuclear Information System (INIS)

    Mangold, Stefanie; De Cecco, Carlo N.; Schoepf, U. Joseph; Kuhlman, Taylor S.; Varga-Szemes, Akos; Caruso, Damiano; Duguay, Taylor M.; Tesche, Christian; Vogl, Thomas J.; Nikolaou, Konstantin

    2017-01-01

    Highlights: • TAVR-planning CT was performed with automated tube voltage selection. • Automated tube voltage selection enables individual tube voltage adaptation. • Image quality was diagnostic while radiation exposure was significantly decreased. - Abstract: Purpose: To assess image quality and accuracy of CT angiography (CTA) for transcatheter aortic valve replacement (TAVR) planning performed with 3rd generation dual-source CT (DSCT). Material and methods: We evaluated 125 patients who underwent TAVR-planning CTA on 3rd generation DSCT. A two-part protocol was performed including retrospectively ECG-gated coronary CTA (CCTA) and prospectively ECG-triggered aortoiliac CTA using 60 mL of contrast medium. Automated tube voltage selection and advanced iterative reconstruction were applied. Effective dose (ED), signal-to-noise (SNR) and contrast-to-noise ratios (CNR) were calculated. Five-point scales were used for subjective image quality analysis. In patients who underwent TAVR, sizing parameters were obtained. Results: Image quality was rated good to excellent in 97.6% of CCTA and 100% of aortoiliac CTAs. CTA studies at >100 kV showed decreased objective image quality compared to 70–100 kV (SNR, all p ≤ 0.0459; CNR, all p ≤ 0.0462). Mean ED increased continuously from 70 to >100 kV (CCTA: 4.5 ± 1.7 mSv–13.6 ± 2.9 mSv, all p ≤ 0.0233; aortoiliac CTA: 2.4 ± 0.9 mSv–6.8 ± 2.7 mSv, all p ≤ 0.0414). In 39 patients TAVR was performed and annulus diameter was within the recommended range in all patients. No severe cardiac or vascular complications were noted. Conclusion: 3rd generation DSCT provides diagnostic image quality in TAVR-planning CTA and facilitates reliable assessment of TAVR device and delivery option while reducing radiation dose.

  4. 77 FR 64422 - Approval and Promulgation of Air Quality Implementation Plans; Illinois; Greif Packaging, LLC...

    Science.gov (United States)

    2012-10-22

    ... Promulgation of Air Quality Implementation Plans; Illinois; Greif Packaging, LLC Adjusted Standard AGENCY... State Implementation Plan (SIP) an adjusted standard for the Greif Packaging, LLC facility located at 5... submitted an Adjusted Standard for the Greif Packaging, LLC facility located at 5 S 220 Frontenac Road in...

  5. Training and Learning as Drivers of US Microenterprise Business Plan Quality

    Science.gov (United States)

    Cook, Ronald G.; Belliveau, Paul; Sandberg, Mark E.

    2004-01-01

    This study examined the output quality of a US microenterprise training program created to help entrepreneurs develop business plans for their ventures. The program concludes with the entrepreneurs' plans being scored by a panel of experts. Hypotheses were developed and tested to determine the importance of feedback, key components of business…

  6. 77 FR 44544 - Approval and Promulgation of Air Quality Implementation Plans; Utah; Determination of Clean Data...

    Science.gov (United States)

    2012-07-30

    ... further progress plans, reasonably available control measures, and contingency measures, no longer apply... Promulgation of Air Quality Implementation Plans; Utah; Determination of Clean Data for the 1987 PM 10 Standard... VI. Statutory and Executive Order Reviews Definitions For the purpose of this document, we are giving...

  7. [A plan for the improvement in the quality of life of people suffering from chronic diseases].

    Science.gov (United States)

    Portal, Stéphanie

    2011-10-01

    In 2007, the French Ministry of Health launched a plan devoted to the improvement of the quality of life of patients suffering from chronic diseases. Over the last four years this plan has resulted in a number of concrete actions: events and seminars have been organised, patients' education has obtained legislative recognition and several partnerships have been created. Time for a progress report.

  8. 77 FR 3389 - Approval and Promulgation of State Air Quality Plans for Designated Facilities and Pollutants...

    Science.gov (United States)

    2012-01-24

    ... Promulgation of State Air Quality Plans for Designated Facilities and Pollutants, State of West Virginia; Control of Emissions From Existing Hospital/Medical/Infectious Waste Incinerator Units, Plan Revision... final action to approve a revision to the West Virginia hospital/medical/infectious waste incinerator...

  9. 77 FR 3422 - Approval and Promulgation of State Air Quality Plans for Designated Facilities and Pollutants...

    Science.gov (United States)

    2012-01-24

    ... Promulgation of State Air Quality Plans for Designated Facilities and Pollutants; State of West Virginia; Control of Emissions From Existing Hospital/Medical/Infectious Waste Incinerator Units, Plan Revision... revision to the West Virginia hospital/medical/infectious waste incinerator (HMIWI) Section 111(d)/ 129...

  10. 75 FR 48895 - Approval and Promulgation of Air Quality Implementation Plans; MN

    Science.gov (United States)

    2010-08-12

    ... Promulgation of Air Quality Implementation Plans; MN AGENCY: Environmental Protection Agency (EPA). ACTION... Plan (SIP) for sulfur dioxide (SO 2 ). The Minnesota Pollution Control Agency submitted the SIP... request would revise SIP requirements applicable to Saint Mary's Hospital, located in Rochester, Minnesota...

  11. 75 FR 20922 - Approval and Promulgation of Air Quality Implementation Plans; New Mexico; Transportation...

    Science.gov (United States)

    2010-04-22

    ... with the January 2009, ``Guidance for Developing Transportation Conformity State Implementation Plans... Promulgation of Air Quality Implementation Plans; New Mexico; Transportation Conformity Requirement for... Transportation Conformity? II. What Is the Background for This Action? III. What Did the State Submit and How Did...

  12. 77 FR 45326 - Approval, Disapproval and Promulgation of Air Quality Implementation Plans; Arizona; Regional...

    Science.gov (United States)

    2012-07-31

    ... available in either location (e.g., Confidential Business Information). To inspect the hard copy materials..., Disapproval and Promulgation of Air Quality Implementation Plans; Arizona; Regional Haze State and Federal Implementation Plans AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule; notice of additional...

  13. Quality assurance project plan for ground water monitoring activities managed by Westinghouse Hanford Company. Revision 3

    International Nuclear Information System (INIS)

    Stauffer, M.

    1995-11-01

    This quality assurance project plan (QAPP) applies specifically to the field activities and laboratory analysis performed for all RCRA groundwater projects conducted by Hanford Technical Services. This QAPP is generic in approach and shall be implemented in conjunction with the specific requirements of individual groundwater monitoring plans

  14. 200 area liquid effluent facility quality assurance program plan. Revision 1

    International Nuclear Information System (INIS)

    Sullivan, N.J.

    1995-01-01

    Direct revision of Supporting Document WHC-SD-LEF-QAPP-001, Rev. 0. 200 Area Liquid Effluent Facilities Quality Assurance Program Plan. Incorporates changes to references in tables. Revises test to incorporate WHC-SD-LEF-CSCM-001, Computer Software Configuration Management Plan for 200 East/West Liquid Effluent Facilities

  15. 76 FR 13511 - Approval and Promulgation of Air Quality Implementation Plans; Virginia; Revisions to the Open...

    Science.gov (United States)

    2011-03-14

    ... Promulgation of Air Quality Implementation Plans; Virginia; Revisions to the Open Burning Regulations AGENCY... approve revisions to the Virginia State Implementation Plan (SIP). The revisions recodify the open burning... approving these revisions to Virginia's open burning regulations in accordance with the requirements of the...

  16. 76 FR 13569 - Approval and Promulgation of Air Quality Implementation Plans; Virginia; Revisions to the Open...

    Science.gov (United States)

    2011-03-14

    ... Promulgation of Air Quality Implementation Plans; Virginia; Revisions to the Open Burning Regulations AGENCY... Implementation Plan (SIP) revision submitted by the Commonwealth of Virginia. The revisions recodify the open... . C. Mail: EPA-R03-OAR-2010-0902, Harold A. Frankford, Air Protection Division, Mailcode 3AP00, U.S...

  17. 78 FR 40966 - Approval and Promulgation of Air Quality Implementation Plans; New Mexico; Interstate Transport...

    Science.gov (United States)

    2013-07-09

    ... Promulgation of Air Quality Implementation Plans; New Mexico; Interstate Transport of Fine Particulate Matter... a State Implementation Plan (SIP) submittal from the State of New Mexico to address Clean Air Act (CAA or Act) requirements that prohibit air emissions which will contribute significantly to...

  18. Minimum variance and variance of outgoing quality limit MDS-1(c1, c2) plans

    Science.gov (United States)

    Raju, C.; Vidya, R.

    2016-06-01

    In this article, the outgoing quality (OQ) and total inspection (TI) of multiple deferred state sampling plans MDS-1(c1,c2) are studied. It is assumed that the inspection is rejection rectification. Procedures for designing MDS-1(c1,c2) sampling plans with minimum variance of OQ and TI are developed. A procedure for obtaining a plan for a designated upper limit for the variance of the OQ (VOQL) is outlined.

  19. Software quality assurance plan for the National Ignition Facility integrated computer control system

    Energy Technology Data Exchange (ETDEWEB)

    Woodruff, J.

    1996-11-01

    Quality achievement is the responsibility of the line organizations of the National Ignition Facility (NIF) Project. This Software Quality Assurance Plan (SQAP) applies to the activities of the Integrated Computer Control System (ICCS) organization and its subcontractors. The Plan describes the activities implemented by the ICCS section to achieve quality in the NIF Project`s controls software and implements the NIF Quality Assurance Program Plan (QAPP, NIF-95-499, L-15958-2) and the Department of Energy`s (DOE`s) Order 5700.6C. This SQAP governs the quality affecting activities associated with developing and deploying all control system software during the life cycle of the NIF Project.

  20. Multicentre quality assurance of intensity-modulated radiation therapy plans: a precursor to clinical trials

    International Nuclear Information System (INIS)

    Williams, M. J.; Bailey, M. J.; Forstner, D.; Metcalfe, P. E

    2007-01-01

    Full text: A multicentre planning study comparing intensity-modulated radiation therapy (IMRT) plans for the treatment of a head and neck cancer has been carried out. Three Australian radiotherapy centres, each with a different planning system, were supplied a fully contoured CT dataset and requested to generate an IMRT plan in accordance with the requirements of an IMRT-based radiation therapy oncology group clinical trial. Plan analysis was carried out using software developed specifically for reviewing multicentre clinical trial data. Two out of the three plans failed to meet the prescription requirements with one misinterpreting the prescription and the third failed to meet one of the constraints. Only one plan achieved all of the dose objectives for the critical structures and normal tissues. Although each centre used very similar planning parameters and beam arrangements the resulting plans were quite different. The subjective interpretation and application of the prescription and planning objectives emphasize one of the many difficulties in carrying out multicentre IMRT planning studies. The treatment prescription protocol in a clinical trial must be both lucid and unequivocally stated to avoid misinterpretation. Australian radiotherapy centres must show that they can produce a quality IMRT plan and that they can adhere to protocols for IMRT planning before using it in a clinical trial