WorldWideScience

Sample records for qualifying installation program

  1. 26 CFR 1.127-1 - Amounts received under a qualified educational assistance program.

    Science.gov (United States)

    2010-04-01

    ... employee under a qualified educational assistance program described in § 1.127-2, or (2) The value of... Income § 1.127-1 Amounts received under a qualified educational assistance program. (a) Exclusion from.... (c) Amounts received under a nonqualified program. Any amount received under an educational...

  2. Optimal installation program for reprocessing plants

    International Nuclear Information System (INIS)

    Kubokawa, Toshihiko; Kiyose, Ryohei

    1976-01-01

    Optimization of the program of installation of reprocessing plants is mathematically formulated as problem of mixed integer programming, which is numerically solved by the branch-and-bound method. A new concept of quasi-penalty is used to obviate the difficulties associated with dual degeneracy. The finiteness of the useful life of the plant is also taken into consideration. It is shown that an analogous formulation is possible for the cases in which the demand forecasts and expected plant lives cannot be predicted with certainty. The scale of the problem is found to have kN binary variables, (k+2)N continuous variables, and (k+3)N constraint conditions, where k is the number of intervals used in the piece-wise linear approximation of a nonlinear objective function, and N the overall duration of the period covered by the installation program. Calculations are made for N=24 yr and k=3, with the assumption that the plant life is 15 yr, the plant scale factor 0.5, and the maximum plant capacity 900 (t/yr). The results are calculated and discussed for four different demand forecasts. The difference of net profit between optimal and non-optimal installation programs is found to be in the range of 50 -- 100 M$. The pay-off matrix is calculated, and the optimal choice of action when the demand cannot be forecast with certainty is determined by applying Bayes' theory. The optimal installation program under such conditions of uncertainty is obtained also with a stochastic mixed integer programming model. (auth.)

  3. DOD low energy model installation program

    International Nuclear Information System (INIS)

    Fournier, D.F. Jr.

    1993-01-01

    The Model Low Energy Installation Program is a demonstration of an installation-wide, comprehensive energy conservation program that meets the Department of Defense (DoD) energy management goals of reducing energy usage and costs by at least 20%. It employs the required strategies for meeting these goals, quantifies the environmental compliance benefits resulting from energy conservation and serves as a prototype for DoD wide application. This project will develop both analysis tools and implementation procedures as well as demonstrate the effectiveness of a comprehensive, coordinated energy conservation program based on state-of-the-art technologies. A military installation is in reality a small to medium sized city. It generally has a complete utilities infrastructure including water supply and distribution, sewage collection and treatment, electrical supply and distribution, central heating and cooling plants with thermal distribution, and a natural gas distribution system. These utilities are quite extensive and actually consume about 10-15% of the energy on the facility not counting the energy going into the central plants

  4. RERTR program progress in qualifying reduced-enrichment fuels

    International Nuclear Information System (INIS)

    Snelgrove, James L.

    1983-01-01

    In order to provide the technical means for reducing the enrichment of uranium used to fuel research and test reactors, the U.S. Reduced Enrichment Research and Test Reactor (RERTR) Program has been engaged in the development and testing of higher-uranium-density fuels than had been used previously. This fuel development effort included work to increase the density of fuels which were being used at the time the Program began and work on a fuel with the potential for much higher density. The ultimate goal of the fuel development and testing phase of the Program is to 'qualify' the fuel for use. A fuel is considered qualified when a sufficient data base for the fuel exists that it can be approved by regulating bodies for use in reactors. To convert a core to the use of reduced-enrichment fuel it is necessary to show that the core will behave properly during normal and off-normal operating conditions and to show that the fuel will behave properly to a reasonable margin beyond the conditions expected during normal operation. It is this latter area that this paper will address. The main characteristics to be considered in evaluating the performance of a fuel are its swelling, its blister-threshold temperature, and its metallurgical appearance. Data for the qualification of the reduced-enrichment fuels being developed by the RERTR Program are obtained from examination of miniature fuel plates (miniplates) which successfully pass the irradiation screening tests and from examinations of full-sized fuel elements. This paper will summarize the miniplate data reported in other papers presented during this meeting and will give the status of full-sized element irradiations. Finally, the current status of qualification of the various fuel types will be discussed and some projections of the future will be given

  5. Worst-case prediction of normal operating containment temperatures for environmentally qualified equipment

    International Nuclear Information System (INIS)

    Krasnopoler, M.J.; Sundergill, J.E.

    1991-01-01

    Due to issues raised in NRC Information Notice No. 87-65, a southern US nuclear plant was concerned about thermal aging of environmentally qualified (EQ) equipment located in areas of elevated containment temperatures. A method to predict the worst-case monthly temperatures at various zones in the containment and calculate the qualified life using this monthly temperature was developed. Temperatures were predicted for twenty locations inside the containment. Concern about the qualified life of EQ equipment resulted from normal operating temperatures above 120F in several areas of the containment, especially during the summer. At a few locations, the temperature exceeded 140F. Also, NRC Information Notice No. 89-30 reported high containment temperatures at three other nuclear power plants. The predicted temperatures were based on a one-year containment temperature monitoring program. The monitors included permanent temperature monitors required by the Technical Specifications and temporary monitors installed specifically for this program. The temporary monitors were installed near EQ equipment in the expected worst-case areas based on design and operating experience. A semi-empirical model that combined physical and statistical models was developed. The physical model was an overall energy balance for the containment. The statistical model consists of several linear regressions that conservatively relate the monitor temperatures to the bulk containment temperature. The resulting semi-empirical model predicts the worst-case monthly service temperatures at the location of each of the containment temperature monitors. The monthly temperatures are the maximum expected because they are based on the historically worst-case atmospheric data

  6. Environmental qualification program for Wolsong project

    International Nuclear Information System (INIS)

    Duggal, A.; Johal, H.; Yee, F.; Suh, S.K.

    1995-01-01

    The Wolsong EQ Program is a process that begins at the design concept stage and continues throughout the operating life of the station. As all components may not have a 30 year service life without periodic maintenance, the EQ Program becomes an important management tool for the owner of the plant. First, the environmental conditions are predicted for the postulated events. Next, suitably qualified equipment is specified and procured. Then the equipment is installed according to specific instructions. Finally, by means of ongoing maintenance and replacement of parts, the qualification of the equipment is maintained during the operating life of the plant. Proper documentation and traceability is required at all stages of the program. As defined in the Wolsong Project Environmental Qualification Design Guide a comprehensive Environmental Qualification (EQ) Program ensures that safety related equipment located in an area in which a harsh environment could occur, can function when required for the life of the station . This program was implemented at the beginning of the Wolsong project. Using this program, components/equipment are qualified prior to installation and a maintenance program is established to keep equipment 'qualified' throughout the station life

  7. Post-installed concrete anchors in nuclear power plants: Performance and qualification

    International Nuclear Information System (INIS)

    Mahrenholtz, Philipp; Eligehausen, Rolf

    2015-01-01

    Graphical abstract: - Highlights: • Review of qualification and design regulations for anchors in nuclear power plants. • First complete set of nuclear anchor load–displacement data and its evaluation ever. • Demonstration of robust test behavior of a qualified post-installed anchor product. - Abstract: In nuclear power plants (NPPs), post-installed anchors are widely used for structural and non-structural connections to concrete. In many countries, anchor products employed for safety relevant applications have to be approved by the authorities. For the high safety standards in force for NPPs, special requirements have to be met to allow for extreme design situations. This paper presents an experimental test program conducted to evaluate the performance of anchors according to the German Guideline for Anchorages in Nuclear Power Plants and Nuclear Technology Installations (DIBt KKW Leitfaden, 2010). After a brief introduction to anchor behavior and the regulative context, the results of tension and shear tests carried out on undercut anchors are discussed. Robust load capacities and relatively small displacements determined for demanding load and crack cycling tests demonstrated the suitability of anchors qualified according to a state-of-the-art qualification guideline

  8. 7 CFR 4290.110 - Qualified management.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 15 2010-01-01 2010-01-01 false Qualified management. 4290.110 Section 4290.110... Qualifications for the RBIC Program Organizing A Rbic § 4290.110 Qualified management. An Applicant must show, to the satisfaction of the Secretary, that its current or proposed management team is qualified and has...

  9. Department of the Army Installation Restoration Program

    International Nuclear Information System (INIS)

    Anderson, A.W.

    1988-01-01

    The Army's Installation Restoration Program (IRP) was established in 1975 in response to regulatory action at several installations where past disposal practices had caused contamination of streams and groundwater. The need to decontaminate excess Army-owned real estate also was considered in early IRP activities. A variety of site types have been discovered on Army installations. The major site types evaluated to date include: contaminated soil areas, landfills, lagoons, buildings, burning grounds, sumps, pits, storage tanks, sewage treatment plants, storage pads, industrial wastewater treatment plants, and salvage yards. Twenty Army installations have been proposed for or listed on the National Priorities List (NPL). The need for taking action at hazardous waste sites, however, is based on threats they pose to human health, welfare or the environment. Sites do not have to be on the SPL in order to be cleaned up through IRP activities. All of the sites that caused Army installations to be proposed for the NPL are being evaluated and cleaned up. In addition, all Army properties have been or will be assessed and where needed they will be addressed by the IRP

  10. Mid-market transformation programs: programs to promote best practices in system specification and installation

    International Nuclear Information System (INIS)

    Rosenberg, Mitchell

    2003-01-01

    This paper summarizes the experience of programs designed to promote the adoption of best practices in equipment specification and installation among distributors and installation contractors in the residential central air conditioning and industrial compressed air equipment markets. For each of those markets, the paper identifies the current understanding of best practices, characterizes energy savings available from their adoption, assesses the nature of barriers to their adoption, and describes the operations and accomplishments of programs designed to address those barriers

  11. Material Life Cycle Analysis for the Reduction of Waste Generation at Military Installations

    Science.gov (United States)

    2017-02-01

    Materials Management (SMM) Strategy. SMM is defined as an approach to serving human needs by using/reusing resources productively and sustainably...tributable to the product or process during its life cycle. In the case of waste management , different alternatives for reuse, recycling, and disposal—in...Installation Management (ACSIM). 2010. Qualified Recycling Program Handbook . Washington, DC: U.S. Army ACSIM, http://www.usar.army.mil/Portals/98

  12. Qualifying Elbow Meters for High Pressure Flow Measurements in an Operating Nuclear Power Plant

    International Nuclear Information System (INIS)

    Chan, A.M.; Maynard, K.J.; Ramundi, J.; Wiklung, E.

    2006-01-01

    To support the installation and use of elbow meters to measure the high pressure emergency coolant injection flow in an operating nuclear station, a test program was performed to qualify: (i) the 'hot' tapping procedure for field application and (ii) the use of elbow meters for accurate flow measurements over the full range of station ECI flow conditions. This paper describes the design conditions and major components of a flow loop used for the elbow meter calibrations. Typical test results are presented and discussed. (authors)

  13. Supply Inventory Management: Evaluation of the Defense Supply Center Columbus Qualified Products List and Qualified Manufacturers List Program

    National Research Council Canada - National Science Library

    2002-01-01

    ... was transitioned from the Military Departments. The Defense Supply Center Columbus currently has management responsibility for over 300 Qualified Products Lists and 4 Qualified Manufacturers Lists...

  14. Fiscal year 1996 well installation program summary, Y-12 Plant Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1997-04-01

    This report summarizes the well installation activities conducted during the federal fiscal year (FY) 1996 drilling program at the Oak Ridge Y-12 Plant, Oak Ridge Tennessee. Synopses of monitoring well construction/well development data, well location rationale, geological/hydrological observations, quality assurance/quality control methods, and health and safety monitoring are included. Two groundwater monitoring wells were installed during the FY 1996 drilling program. One of the groundwater monitoring wells was installed in the Lake Reality area and was of polyvinyl chloride screened construction. The other well, installed near the Ash Disposal Basin, was of stainless steel construction

  15. The Role Of Quality Assurance Program For Safety Operation Of Nuclear Installations

    International Nuclear Information System (INIS)

    Harjanto, N.T.; Purwadi, K.P.; Boru, D.S.; Farida; Suharni

    2000-01-01

    Nuclear installations expose potential hazard of radiation, therefore in their construction, operation and maintenance, it is necessary to consider safety aspect, in which the safety requirements which has been determined must be met. One of the requirements that is absolutely needed is quality assurance, which covers arrangement of quality assurance program, organization and administration of the implementation of quality assurance, and supervision. Quality Assurance program is a guideline containing quality policies and basic determination on the realization of activities that effect the quality of equipment's and items used in the operation of nuclear installations in order that the operation of nuclear installation can run safety and in accordance with their design aims and operation limits. Quality Assurance Program includes document control, design control, supply control, control of equipment s and items, operation/process control, inspection and control of equipment test, and control of nonconformance and corrections. General system of nuclear installation operation is equipped with safety and supporting systems. These systems must apply the quality assurance program that cover control of activities in the systems. In the implementation of the quality assurance program, it is necessary to establish procedures, work guidelines/instructions, and quality recording that constitutes documents of quality system 2 nd , 3 th , and 4 th level after the quality assurance program. To ensure the effectivity and to prove whether the realization of the program has been pursuant to the determined requirements, an internal audit must be conducted accordingly

  16. Installation of a second trip system

    International Nuclear Information System (INIS)

    Bessada, E.

    1997-01-01

    Since its first criticality in 1957, the NRU reactor has been operating safely and efficiently supporting the CANDU reactor's research and development programs and producing radioisotopes for medical use. To ensure that the reactor continues to operate safely and effectively, Atomic Energy of Canada Limited (AECL) commissioned a team in 1989 to conduct a systematic review and assessment of the reactor condition. The outcome of the study indicated that the overall condition of the reactor is good and that it is being operated safely. The study also produced recommendations as to where safety can be improved. These recommendations are the basis of the upgrade program currently being implemented in the reactor. The Second Trip System (STS) is part of the upgrade program. It is a stand alone seismically qualified trip system that operates independently from the existing first trip system (FST) to shutdown the reactor. This paper discusses the design, installation and the inactive commissioning of the system, and the process used to ensure that the system can be retrofitted to the reactor without affecting its safety or its operational requirements. (author)

  17. The Prevalence of Multiple-Choice Testing in Registered Nurse Licensure-Qualifying Nursing Education Programs in New York State.

    Science.gov (United States)

    Birkhead, Susan; Kelman, Glenda; Zittel, Barbara; Jatulis, Linnea

    The aim of this study was to describe nurse educators' use of multiple-choice questions (MCQs) in testing in registered nurse licensure-qualifying nursing education programs in New York State. This study was a descriptive correlational analysis of data obtained from surveying 1,559 nurse educators; 297 educators from 61 institutions responded (response rate [RR] = 19 percent), yielding a final cohort of 200. MCQs were reported to comprise a mean of 81 percent of questions on a typical test. Baccalaureate program respondents were equally likely to use MCQs as associate degree program respondents (p > .05) but were more likely to report using other methods of assessing student achievement to construct course grades (p < .01). Both groups reported little use of alternate format-type questions. Respondent educators reported substantial reliance upon the use of MCQs, corroborating the limited data quantifying the prevalence of use of MCQ tests in licensure-qualifying nursing education programs.

  18. Installation of the Ion Accelerator for the Surface Analysis

    Energy Technology Data Exchange (ETDEWEB)

    Kwon, Hyeok-Jung; Kim, Han-Sung; Chung, Bo-Hyun; Ahn, Tae-Sung; Kim, Dae-Il; Kim, Cho-Rong; Cho, Yong-Sub [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2015-10-15

    In this paper, an introduction to the accelerator, an installation status at KOMAC and the operation plan of the accelerator are discussed. A pelletron, which has been used over 25 years at KIGAM, is moved and installed at KOMAC in order to supply a qualified service to ion beam users. The system will be installed in September and component tests will be carried. The operation of the system starts in 2016 after it gets operation license from Nuclear Safety and Security Commission. Korea Multi-purpose Accelerator Complex (KOMAC) is operating several ion beam accelerators to provide various ion beams to users. Those are a 100 MeV proton linear accelerator, a 220 keV ion implanter for gaseous ion beams, a 150 keV metal ion implanter and a 20 keV high-current ion implanter. All of those are the machine for user service and it is important to qualify the results of the irradiation conditions for user service. For this reason, an electrostatic tandem accelerator, which has been operating over 25 years at Korea Institute of Geoscience and Mineral Resources (KIGAM), is moved to KOMAC in order to supply the qualified and quantified data on the irradiation species.

  19. Qualification of R.A. waste conditioning process and installations by ONDRAF/NIRAS

    International Nuclear Information System (INIS)

    Havard, P.; Faniel, L.; Voet, M.; Goeyse, A. de.

    1993-01-01

    ONDRAF/NIRAS in its role of national agency responsible for the management of radioactive waste in Belgium (including transport, intermediate storage and final disposal of the conditioned waste) has defined and enforces conditions for the acceptance (i.e. taking over) of conditioned waste packages. The waste acceptance conditions applicable at the present time are: 1. The conditioning process and installations are qualified by ONDRAF/NIRAS; 2. The waste packages are produced according to the qualified process and installations, and meet the technical specifications and acceptance criteria defined by ONDRAF/NIRAS; 3. The production of the waste packages is supervised by ONDRAF/NIRAS through an inspection and control programme specific to each conditioning process and associated installation, and has been found satisfactory. (author)

  20. Solar array qualification through qualified analysis

    Science.gov (United States)

    Zijdemans, J.; Cruijssen, H. J.; Wijker, J. J.

    1991-04-01

    To achieve qualification is in general a very expensive exercise. For solar arrays this is done by a dedicated test program through which final qualification is achieved. Due to severe competition on the solar array market, cheaper means are looked for to achieve a qualified product for the customers. One of the methods is to drastically limit the environmental test program and to qualify the solar-array structure against its environmental loads by analysis. Qualification by analysis is possible. The benefits are that a significant amount of development effort can be saved in case such a powerful tool is available. Extensive testing can be avoided thus saving time and money.

  1. Fiscal year 1994 well installation program summary report, Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1994-09-01

    This report summarizes the well installation activities conducted during the federal fiscal year (FY) 1994 drilling program at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee. Synopses of monitoring well construction/well development data, well location rationale, geological/hydrological observations, quality assurance/quality control methods, and health and safety monitoring are included. Two monitoring wells were installed and one piezometer installation was attempted, but not completed, during the FY 1994 drilling program. In addition, SAIC provided health and safety and geotechnical oversight for two soil borings in support of the Y-12 Underground Storage Tank (UST) Program. All new monitoring wells were developed by either a 2.0-in. diameter swab rig or by hand bailing until nonspecific indicator parameters (pH and specific conductance) attained steady-state levels. Turbidity levels were lowered, if required, to the extent practicable by continued development beyond a steady-state level of pH and conductance. All well installation was conducted following industry-standard methods and approved procedures in the Environment Surveillance Procedures Quality Control Program (Energy Systems 1988), the Resource Conservation and Recovery Act (RCRA) Groundwater Monitoring Technical Enforcement Guidance Document (EPA 1986), and Guidelines for Installation of Monitor Wells at the Y-12 Plant (Geraghty and Miller 1985). Health and safety monitoring and field screening of drilling returns and development waters were conducted in accordance with approved Martin Marietta Energy Systems, Inc. (Energy Systems) guidelines. All of the monitoring wells installed during FY 1994 at the Y-12 Plant were of screened construction

  2. Fiscal year 1995 well installation program summary Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1995-09-01

    This report summarizes the well installation activities conducted during the federal fiscal year (FY) 1995 drilling program at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee (including activities that were performed in late FY 1994, but not included in the FY 1994 Well Installation Program Summary Report). Synopses of monitoring well construction/well development data, well location rationale, geological/hydrological observations, quality assurance/quality control methods, and health and safety monitoring are included. Three groundwater monitoring wells and two gas monitoring probes were installed during the FY 1995 drilling program. One of the groundwater monitoring wells was installed at Landfill VI, the other two in the Boneyard/Burnyard area. All of the groundwater monitoring wells were constructed with stainless steel screens and casings. The two gas monitoring probes were installed at the Centralized Sanitary Landfill II and were of polyvinyl chloride (PVC) screened construction. Eleven well rehabilitation/redevelopment efforts were undertaken during FY 1995 at the Y-12 Plant. All new monitoring wells and wells targeted for redevelopment were developed by either a 2.0-in. diameter swab rig or by hand bailing until nonspecific parameters (pH and specific conductance) attained steady-state levels. Turbidity levels were lowered, if required, to the extent practicable by continued development beyond a steady-state level of pH and conductance

  3. Newly qualified teachers´ possibilities to get foothold in a lifelong career course

    DEFF Research Database (Denmark)

    Krøjgaard, Frede; Frederiksen, Lisbeth Angela Lunde

    Keyword: Induction program, newly qualified teachers, NQT, retention, professional development In Contrary to many other countries in Europe Denmark does not have any kind of national program regarding teacher induction program (TIP) or support in general to newly qualified teachers what so ever...

  4. 7 CFR 785.8 - Reports by qualifying States receiving mediation grant funds.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 7 2010-01-01 2010-01-01 false Reports by qualifying States receiving mediation grant... SERVICE AGENCY, DEPARTMENT OF AGRICULTURE SPECIAL PROGRAMS CERTIFIED STATE MEDIATION PROGRAM § 785.8 Reports by qualifying States receiving mediation grant funds. (a) Annual report by certified State...

  5. 78 FR 72016 - User Fees for Processing Installment Agreements and Offers in Compromise

    Science.gov (United States)

    2013-12-02

    ... into currently-not-collectible (CNC) status rather than enter into an installment agreement. The... qualify for CNC status. The IRS places a taxpayer in CNC status on the basis of hardship when it... taxpayer in CNC status may, without an installment agreement, pay the tax over time to help limit the...

  6. Physical Protection Study of the Radio metallurgy Installation Using SAVIComputer Program

    International Nuclear Information System (INIS)

    Pinitoyo, Andreas

    2000-01-01

    Based on IAEA Recommendation on INFCIR/225/Rev.3 (The Physical Protectionof Nuclear Material), a nuclear installation shall have physical protectionsystem for protection or being secure on sabotage activities in theinstallation and thieve of nuclear materials. The recommendation states therequirements for physical protection of nuclear materials usage, transit andstorage. Radio metallurgy Installation of the Fuel Element and ReprocessingDevelopment Center (BATAN) at Serpong is a nuclear installation for researchon post irradiation of high radioactive spent fuel element, its processingand storage. The installation has risk on threat of a sabotage, which isdominant than thieve. The RMI building was designed and constructed ofphysical protection components and have been integrated with the BATAN Safetyand Security System and the Security Guards functions to be PhysicalProtection System for the RMI. By using the SAVI Computer Program with inputdata from the existing standards, assumptions for detection possibility,delay and response, that will result the probability of interruptions of theworst adversary paths PI = 0.1. These mean that the physical protectionsystems of the RMI shall be upgraded and improved in order to be reliable orbetter if the most of paths to the target PI = 1.0. (author)

  7. The Savannah River Site's Groundwater Monitoring Program 1991 well installation report

    International Nuclear Information System (INIS)

    1992-06-01

    This report is a summary of the well and environmental soil boring information compiled for the groundwater monitoring program of the Environmental Protection Department/Environmental Monitoring Section (EPD/EMS) at the Savannah River Site (SRS) during 1991. It includes discussion of environmental soil borings, surveying, well installations, abandonments, maintenance, and stabilization

  8. 76 FR 2029 - Small Business Investment Companies-Energy Saving Qualified Investments

    Science.gov (United States)

    2011-01-12

    ... 3245-AF86 Small Business Investment Companies--Energy Saving Qualified Investments AGENCY: U.S. Small... Administration (SBA) is setting forth the new defined terms, ``Energy Saving Qualified Investment'' and ``Energy Saving Activities'', for the Small Business Investment Company (SBIC) Program. The new definitions are...

  9. 1.3 GHz superconducting RF cavity program at Fermilab

    Energy Technology Data Exchange (ETDEWEB)

    Ginsburg, C.M.; Arkan, T.; Barbanotti, S.; Carter, H.; Champion, M.; Cooley, L.; Cooper, C.; Foley, M.; Ge, M.; Grimm, C.; Harms, E.; /Fermilab

    2011-03-01

    At Fermilab, 9-cell 1.3 GHz superconducting RF (SRF) cavities are prepared, qualified, and assembled into cryomodules (CMs) for Project X, an International Linear Collider (ILC), or other future projects. The 1.3 GHz SRF cavity program includes targeted R&D on 1-cell 1.3 GHz cavities for cavity performance improvement. Production cavity qualification includes cavity inspection, surface processing, clean assembly, and one or more cryogenic low-power CW qualification tests which typically include performance diagnostics. Qualified cavities are welded into helium vessels and are cryogenically tested with pulsed high-power. Well performing cavities are assembled into cryomodules for pulsed high-power testing in a cryomodule test facility, and possible installation into a beamline. The overall goals of the 1.3 GHz SRF cavity program, supporting facilities, and accomplishments are described.

  10. Structural qualification of the multifunctional instrument tree for installation in double-shell and 100-series single-shell tanks

    International Nuclear Information System (INIS)

    Strohlow, J.P.

    1995-12-01

    This document provides the technical basis and methodology for qualifying the multifunctional instrument tree (MIT) structure for installation in double-shell and 100-series single-shell tanks. Structural qualification for MIT installations in specific tanks are also contained in this document

  11. 13 CFR 126.204 - May a qualified HUBZone SBC have affiliates?

    Science.gov (United States)

    2010-01-01

    ... affiliates? 126.204 Section 126.204 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION HUBZONE PROGRAM Requirements to be a Qualified HUBZone SBC § 126.204 May a qualified HUBZone SBC have affiliates? A concern may have affiliates provided that the aggregate size of the concern and all of its...

  12. TopWorx/GO switch new generation nuclear qualified proximity position sensors

    International Nuclear Information System (INIS)

    Merrifield, G.

    2011-01-01

    An overview of the benefits of installing TopWorx/GO Nuclear Qualified Proximity Position Sensors instead of traditional mechanical switches. Mechanical switches have been the standard for the nuclear industry for years, but that is only because of lack of competition. Because of multiple moving parts, three-piece design, and new low current control systems, mechanical switches are susceptible to a host of environmental factors that cause them to break and/or fail. TopWorx/GO Switch is a smaller, rugged, dependable, one-piece Stainless Steel proximity position sensor that that exceeds CANDU and Global Qualification Levels, easily replacing mechanical switches. It is the only position sensor to meet or exceed Westinghouse AP 1000 specifications as well. Nuclear facilities save money in maintenance reductions, extended PM's and reduction in 'Man REM' hours. This is achieved by not having to service and replace GO Switch position sensors as often as mechanical switches, since their qualified life is 100 years +1 Post Accident submerged. Plant safety is increased due to less switch failure, higher qualification testing levels, repeatability and longer qualified life. (author)

  13. Primary care program improves reimbursement. The Federally Qualified Health Center program helps hospitals improve services to the medically indigent.

    Science.gov (United States)

    Fahey, T M; Gallitano, D G

    1993-03-01

    Under a program created by Congress in 1989, certain primary care treatment centers serving the medically and economically indigent can become Federally Qualified Health Centers (FQHCs). Recently enacted rules and regulations allow participants in the FQHC program to receive 100 percent reasonable cost reimbursement for Medicaid services and 80 percent for Medicare services. An all-inclusive annual cost report is the basis for determining reimbursement rates. The report factors in such expenses as physician and other healthcare and professional salaries and benefits, medical supplies, certain equipment depreciation, and overhead for facility and administrative costs. Both Medicaid and Medicare reimbursement is based on an encounter rate, and states employ various methodologies to determine the reimbursement level. In Illinois, for example, typical reimbursement for a qualified encounter ranges from $70 to $88. To obtain FQHC status, an organization must demonstrate community need, deliver the appropriate range of healthcare services, satisfy management and finance requirements, and function under a community-based governing board. In addition, an FQHC must provide primary healthcare by physicians and (where appropriate) midlevel practitioners; it must also offer its community diagnostic laboratory and x-ray services, preventive healthcare and dental care, case management, pharmacy services, and arrangements for emergency services. Because FQHCs must be freestanding facilities, establishing them can trigger a number of ancillary legal issues, such as those involved in forming a new corporation, complying with not-for-profit corporation regulations, applying for tax-exempt status, and applying for various property and sales tax exemptions. Hospitals that establish FQHCs must also be prepared to relinquish direct control over the delivery of primary care services.

  14. Python Introduction and Installation

    Directory of Open Access Journals (Sweden)

    William J. Turkel

    2012-07-01

    Full Text Available This first lesson in our section on dealing with Online Sources is designed to get you and your computer set up to start programming. We will focus on installing the relevant software – all free and reputable – and finally we will help you to get your toes wet with some simple programming that provides immediate results. In this opening module you will install the Python programming language, the Beautiful Soup HTML/XML parser, and a text editor. Screencaps provided here come from Komodo Edit, but you can use any text editor capable of working with Python. Here’s a list of other options: Python Editors. Once everything is installed, you will write your first programs, “Hello World” in Python and HTML.

  15. Aging techniques and qualified life for safety system components

    International Nuclear Information System (INIS)

    Weaver, W.W.

    1980-01-01

    Presently, the qualified life objective for Class IE safety system components in nuclear power plants is somewhat of a subjective engineering judgment. When the desired qualified life is ascertained, there are other choices that must be made (which may be influenced by the desired qualified life) such as selecting the aging procedure to use in the qualification process. Adding complexity to the situation is the fact that there are some limitations in aging techniques at the present time. This article presents (1) a discussion of the limitations in aging procedures, (2) the general philosophy of qualification, and (3) a proposed method for specifying a desired qualified life, which uses a probabilistic approach. The probabilistic approach proposed in item 3 can be applied to natural aging programs and eventually to accelerated aging once the present technical difficulties are overcome

  16. 26 CFR 1.181-3T - Qualified film or television production (temporary).

    Science.gov (United States)

    2010-04-01

    ... season of programming. (3) Exception for certain sexually explicit productions. A production does not... 26 Internal Revenue 3 2010-04-01 2010-04-01 false Qualified film or television production... (continued) § 1.181-3T Qualified film or television production (temporary). (a) In general. The term...

  17. Utilizing Facebook and Automated Telephone Calls to Increase Adoption of a Local Smoke Alarm Installation Program.

    Science.gov (United States)

    Frattaroli, Shannon; Schulman, Eric; McDonald, Eileen M; Omaki, Elise C; Shields, Wendy C; Jones, Vanya; Brewer, William

    2018-05-17

    Innovative strategies are needed to improve the prevalence of working smoke alarms in homes. To our knowledge, this is the first study to report on the effectiveness of Facebook advertising and automated telephone calls as population-level strategies to encourage an injury prevention behavior. We examine the effectiveness of Facebook advertising and automated telephone calls as strategies to enroll individuals in Baltimore City's Fire Department's free smoke alarm installation program. We directed our advertising efforts toward Facebook users eligible for the Baltimore City Fire Department's free smoke alarm installation program and all homes with a residential phone line included in Baltimore City's automated call system. The Facebook campaign targeted Baltimore City residents 18 years of age and older. In total, an estimated 300 000 Facebook users met the eligibility criteria. Facebook advertisements were delivered to users' desktop and mobile device newsfeeds. A prerecorded message was sent to all residential landlines listed in the city's automated call system. By the end of the campaign, the 3 advertisements generated 456 666 impressions reaching 130 264 Facebook users. Of the users reached, 4367 individuals (1.3%) clicked the advertisement. The automated call system included approximately 90 000 residential phone numbers. Participants attributed 25 smoke alarm installation requests to Facebook and 458 to the automated call. Facebook advertisements are a novel approach to promoting smoke alarms and appear to be effective in exposing individuals to injury prevention messages. However, converting Facebook message recipients to users of a smoke alarm installation program occurred infrequently in this study. Residents who participated in the smoke alarm installation program were more likely to cite the automated call as the impetus for their participation. Additional research is needed to understand the circumstances and strategies to effectively use the social

  18. 17 CFR 240.3b-8 - Definitions of “Qualified OTC Market Maker, Qualified Third Market Maker” and “Qualified Block...

    Science.gov (United States)

    2010-04-01

    ... Market Maker, Qualified Third Market Makerâ and âQualified Block Positionerâ. 240.3b-8 Section 240.3b-8... “Qualified Block Positioner”. For the purposes of Regulation U under the Act (12 CFR part 221): (a) The term... inventory turnover in such security. (c) The term Qualified Block Positioner means a dealer who (1) is a...

  19. IE Information No. 86-104: Unqualified butt splice connectors identified in qualified penetrations

    International Nuclear Information System (INIS)

    Jordan, E.L.

    1992-01-01

    During an NRC equipment qualification (EQ) inspection at Dresden Nuclear Power Station, May 19--23, 1986, a deficiency was discovered concerning a lack of similarity between tested and installed nylon insulated butt splices in EQ qualified GE electrical penetrations. commonwealth Edison sent four sample splices removed from Quad Cities Nuclear Power Station to Wyle Laboratory to further substantiate their qualification for use in a harsh environment. These splices were identical to those installed at Dresden. During the testing performed at Wyle Laboratory December 4--5, 1986, all four samples exhibited excessive leakage currents to ground when exposed to a steam environment. Commonwealth Edison consequently declared the splices unqualified and shut down its Quad Cities Unit 1 to rework the splices by wrapping them with previously qualified tape. Dresden Unit 2 has similarly reworked the splices by wrapping them with tape. Duane Arnold Energy Center also has commenced a shutdown in order to make repairs. The short circuits that occurred appeared to start by condensation entering the splice between the wire insulation and the nylon tubing. The arcing caused insulation degradation that then allowed arcs to pass through the insulation to the enclosure

  20. 49 CFR 213.305 - Designation of qualified individuals; general qualifications.

    Science.gov (United States)

    2010-10-01

    ... college level engineering program, supplemented by special on the job training emphasizing the techniques... engineering program, supplemented by special on the job training emphasizing the techniques to be employed in... 49 Transportation 4 2010-10-01 2010-10-01 false Designation of qualified individuals; general...

  1. Python Introduction and Installation

    OpenAIRE

    William J. Turkel; Adam Crymble

    2012-01-01

    This first lesson in our section on dealing with Online Sources is designed to get you and your computer set up to start programming. We will focus on installing the relevant software – all free and reputable – and finally we will help you to get your toes wet with some simple programming that provides immediate results. In this opening module you will install the Python programming language, the Beautiful Soup HTML/XML parser, and a text editor. Screencaps provided here come from Komodo ...

  2. 7 CFR 1466.11 - Technical services provided by qualified personnel not affiliated with USDA.

    Science.gov (United States)

    2010-01-01

    ... not affiliated with USDA. 1466.11 Section 1466.11 Agriculture Regulations of the Department of... OPERATIONS ENVIRONMENTAL QUALITY INCENTIVES PROGRAM Contracts and Payments § 1466.11 Technical services provided by qualified personnel not affiliated with USDA. (a) NRCS may use the services of qualified TSPs...

  3. Partners in qualified equipment supply

    International Nuclear Information System (INIS)

    Rygg, D.E.; O'Hare, G.J.

    1993-01-01

    Industry initiatives have been taken to improve procurement practices and commercial dedication programs, formation of procurement engineering groups, emphasis on product quality, and increased engineering involvement in procurement and maintenance of qualified equipment. This poses new challenges for many licensees in terms of resources, product knowledge, and access to information normally held proprietary by equipment suppliers. Alternative approaches to future licensee/Westinghouse relationships which will allow licensees to adapt to the changing environment are discussed. 2 figs

  4. 7 CFR 636.18 - Technical services provided by qualified personnel not affiliated with USDA.

    Science.gov (United States)

    2010-01-01

    ... HABITAT INCENTIVES PROGRAM § 636.18 Technical services provided by qualified personnel not affiliated with... affiliated with USDA. 636.18 Section 636.18 Agriculture Regulations of the Department of Agriculture... provided by qualified personnel not affiliated with USDA may include, but is not limited to: Conservation...

  5. 78 FR 679 - Revisions to the Auxiliary Installations, Replacement Facilities, and Siting and Maintenance...

    Science.gov (United States)

    2013-01-04

    ... process, see the Comment Procedures Section of this document. FOR FURTHER INFORMATION CONTACT: Katherine... existing facilities.\\14\\ The Commission reasoned that section 2.55(b) replacements ``should only involve... when an installation can qualify for section 157.203(b) automatic authorization). Further, to alleviate...

  6. Qualifying commercial grade instruments for use in nuclear power generating stations

    International Nuclear Information System (INIS)

    Lamothe, R.J.; Scally, C.R.

    1983-01-01

    Nuclear environmental qualification of instrumentation has been successfully accomplished by many commercial grade equipment manufacturers. This paper was prepared as a guide to those manufacturers who want some insight into a qualification program. The areas addressed are the regulations and documents, the qualification program, and a case history of a chart recorder qualifications. The principal standards relating to a nuclear qualification program are IEEE Std. 323-1974 IEEE Standard for Qualifying Class 1E Equipment for Nuclear Power Generating Stations, IEEE Std. 344-1975 IEEE Recommended Practices for Seismic Qualification of Class 1E Equipment for Nuclear Power Generating Stations and 10CFR50.49. Previously NUREG 0588 Interim Staff Position on Environmental Qualification of Safety-Related Equipment. These define the intent and purpose of the qualification. The qualification program itself consists of several distinct parts which require explanation, including the determination of qualified life, choice of test samples, selection of appropriate acceptance criteria, aging program, radiation testing, seismic testing, abnormal environment tests and others. The case history illustrates the qualification program and the thought processes involved

  7. Going beyond "highly-qualified personnel" to "value-added personnel"

    Science.gov (United States)

    Nantel, Marc; Fox, Bradley; Gelsthorpe, Leanne; Hamilton, Roxy; Marshall, Robert; Williamson, Guida

    2005-10-01

    Employers clamour for more "Highly-Qualified Personnel" (HQP) to hire, and photonics is no exception. The challenge facing all new graduates lies in what actually constitutes a Highly-Qualified Person. Yesterday, an HQP was often understood to be a graduate with a Bachelor's, Master's or Ph.D. degree. Today, industry is demanding that an HQP be either a university or college graduate with strong academic standing AND a sound business and communications skill set. In this paper, we introduce the concept of "Value-Added Personnel" (VAP), which marries both scientific and "soft-skills" aspects, and we present a new program in Ontario to produce VAPs.

  8. Installing Python Modules with pip

    OpenAIRE

    Fred Gibbs

    2013-01-01

    This lesson shows you how to download and install Python modules. There are many ways to install external modules, but for the purposes of this lesson, we’re going to use a program called pip. As of Python 2.7.9 and newer, pip is installed by default. This tutorial will be helpful for anyone using older versions of Python (which are still quite common).

  9. Space Qualified Non-Destructive Evaluation and Structural Health Monitoring Technology, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — Encouraged by Phase I accomplishments, the proposed Phase II program will significantly mature and align the development of a Space Qualified Non-Destructive...

  10. 12 CFR 617.7315 - What records must the qualified lender maintain on behalf of the CRC?

    Science.gov (United States)

    2010-01-01

    ... on behalf of the CRC? 617.7315 Section 617.7315 Banks and Banking FARM CREDIT ADMINISTRATION FARM... must the qualified lender maintain on behalf of the CRC? A qualified lender must maintain a complete file of all requests for CRC reviews, including participation in state mediation programs, the minutes...

  11. 16th edition IEE wiring regulations design and verification of electrical installations

    CERN Document Server

    Scaddan, Brian

    1995-01-01

    This book builds on the basic knowledge and techniques covered in 16th Edition IEE Wiring Regulations Explained and Illustrated, providing the information and revision materials needed for the City & Guilds 2400 (Design, Erection and Verification ofElectrical Installations) exam. All Qualifying Managers will be required to gain this qualification, and Brian Scaddan's book is the ideal text for all students undertaking C&G 2400 courses.

  12. Groundwater quality monitoring well installation for Waste Area Grouping at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Environmental Restoration Program

    International Nuclear Information System (INIS)

    Mortimore, J.A.; Lee, T.A.

    1994-09-01

    This report documents the drilling and installation of 18 groundwater quality monitoring (GQM) wells on the perimeter of Waste Area Grouping (WAG) 11. WAG 11 (White Wing Scrap Yard) is located on the west end of East Fork Ridge between White Wing Road and the Oak Ridge Turnpike. The scrap yard is approximately 25 acres in size. The wells at WAG 11 were drilled and developed between January 1990 and October 1990. These wells were installed to characterize and assess the WAG in accordance with applicable Department of Energy, state, and Environmental Protection Agency regulatory requirements. The wells at WAG 11 were drilled with auger or air rotary rigs. Depending on the hydrogeologic conditions present at each proposed well location, one of four basic installation methods was utilized. Detailed procedures for well construction were specified by the Engineering Division to ensure that the wells would provide water samples representative of the aquifer. To ensure conformance with the specifications, Energy Systems Construction Engineering and ERCE provided continuous oversight of field activities. The purpose of the well installation program was to install GQM wells for groundwater characterization at WAG 11. Data packages produced during installation activities by the ERCE hydrogeologists are an important product of the program. These packages document the well drilling, installation, and development activities and provide valuable data for well sampling and WAG characterization. The forms contained in the packages include predrilling and postdrilling checklists, drilling and construction logs, development and hydraulic conductivity records, and quality control-related documents

  13. A research education program model to prepare a highly qualified workforce in biomedical and health-related research and increase diversity.

    Science.gov (United States)

    Crockett, Elahé T

    2014-09-24

    The National Institutes of Health has recognized a compelling need to train highly qualified individuals and promote diversity in the biomedical/clinical sciences research workforce. In response, we have developed a research-training program known as REPID (Research Education Program to Increase Diversity among Health Researchers) to prepare students/learners to pursue research careers in these fields and address the lack of diversity and health disparities. By inclusion of students/learners from minority and diverse backgrounds, the REPID program aims to provide a research training and enrichment experience through team mentoring to inspire students/learners to pursue research careers in biomedical and health-related fields. Students/learners are recruited from the University campus from a diverse population of undergraduates, graduates, health professionals, and lifelong learners. Our recruits first enroll into an innovative on-line introductory course in Basics and Methods in Biomedical Research that uses a laboratory Tool-Kit (a lab in a box called the My Dr. ET Lab Tool-Kit) to receive the standard basics of research education, e.g., research skills, and lab techniques. The students/learners will also learn about the responsible conduct of research, research concept/design, data recording/analysis, and scientific writing/presentation. The course is followed by a 12-week hands-on research experience during the summer. The students/learners also attend workshops and seminars/conferences. The students/learners receive scholarship to cover stipends, research related expenses, and to attend a scientific conference. The scholarship allows the students/learners to gain knowledge and seize opportunities in biomedical and health-related careers. This is an ongoing program, and during the first three years of the program, fifty-one (51) students/learners have been recruited. Thirty-six (36) have completed their research training, and eighty percent (80%) of them have

  14. Installing Omeka

    Directory of Open Access Journals (Sweden)

    Jonathan Reeve

    2016-07-01

    Full Text Available Omeka.net is a useful service for Omeka beginners, but there are a few reasons why you might want to install your own copy of Omeka. Reasons include: * Upgrades. By installing Omeka yourself, you can use the latest versions of Omeka as soon as they’re released, without having to wait for Omeka.net to upgrade their system. * Plugins and themes. You can install any plugin or theme you want, without being restricted to those provided by Omeka.net. * Customizations. You can buy a custom domain name, and customize your code to achieve your desired functionality. * Control. You have control over your own backups, and you can update the server yourself so that its security is always up-to-date. * Price. There are many low-cost Virtual Private Servers (VPSs now, some of which cost only $5 per month. * Storage. Many shared hosting providers now offer unlimited storage. This is useful if you have a large media library. In this tutorial, we’ll be entering a few commands on the command line. This tutorial assumes no prior knowledge of the command line, but if you want a concise primer, consult the Programming Historian introduction to BASH. There are other ways of installing Omeka, of course, some using exclusively GUI tools. Some hosting providers even offer “one-click installs” via their control panels. Many of those methods, however, will install older versions of Omeka which are then harder to upgrade and maintain. The method outlined below may not be the easiest way to install Omeka, but it will give you some good practice with using the command line, which is a skill that will be useful if you want to manually upgrade your install, or manually install other web frameworks. (For example, this installation method is very similar to WordPress’s “Five-Minute Install”. There are four steps to this process, and it should take about an hour.

  15. 26 CFR 1.936-10 - Qualified investments.

    Science.gov (United States)

    2010-04-01

    ... 26 Internal Revenue 10 2010-04-01 2010-04-01 false Qualified investments. 1.936-10 Section 1.936... (CONTINUED) INCOME TAXES Possessions of the United States § 1.936-10 Qualified investments. (a) In general. [Reserved] (b) Qualified investments in Puerto Rico. [Reserved] (c) Qualified investment in certain...

  16. 26 CFR 1.25-4T - Qualified mortgage credit certificate program (Temporary).

    Science.gov (United States)

    2010-04-01

    ... designed to ensure that only those individuals who could not otherwise purchase a residence will benefit... may be issued in connection with the qualified rehabilitation of a residence part of the cost of which... surrendered to other issuers during the calendar year, (v) The date and amount of any previous elections under...

  17. Are we done yet? An assessment of the remaining barriers to increasing compact fluorescent lamp installations and recommended program strategies for reducing them

    Energy Technology Data Exchange (ETDEWEB)

    Rasmussen, Tami; Canseco, Jennifer [KEMA Inc., Sustainable Market Strategies Group (United States); Rubin, Rob [San Diego Gas and Electric Company (United States); Teja, Anu [Northwest Energy Efficiency Alliance (United States)

    2007-07-01

    Residential energy efficiency lighting programs in active regions of the United States have been successful in dramatically increasing compact fluorescent lamp (CFL) purchases over the last decade - where currently a majority of households have one or more CFLs installed. However, in these regions CFLs are used in less than 10 percent of residential lamp sockets, and much untapped energy savings potential remains. Consumers in these active regions with CFLs already installed could expand their existing CFL installations by a factor of five. The reasons that they are not doing so include waiting for incandescent bulbs to burn out, issues with CFL performance, the need for specialty CFLs (which are expensive and not widely available) and the higher cost of CFLs.Programs in these active regions should consider the following recommendations for increasing CFL installations: encourage consumers to retrofit more CFLs and not to wait for incandescent bulbs to burn out; track and address CFL performance issues for the range of CFL products; broaden program strategies to address specialty CFLs; expand incentives to year-round and to more stores and products; and track market barriers at both the household and lamp socket level.In regions of the United States or countries with emerging residential CFL programs, program planners should consider the following recommendations: research the lighting market and introduce program strategies within existing market channels; focus first on the most basic style of CFLs that are designed to replace standard incandescent bulbs and move to specialty CFLs later; and track and monitor product quality from program inception.

  18. 77 FR 13009 - Regulation of Fuels and Fuel Additives: Identification of Additional Qualifying Renewable Fuel...

    Science.gov (United States)

    2012-03-05

    ... Regulation of Fuels and Fuel Additives: Identification of Additional Qualifying Renewable Fuel Pathways Under the Renewable Fuel Standard Program AGENCY: Environmental Protection Agency (EPA). ACTION: Withdrawal... Renewable Fuel Standard program regulations. Because EPA received adverse comment, we are withdrawing the...

  19. Experience in initial training required for the recognition of the qualified RP expert in Spain

    International Nuclear Information System (INIS)

    Rodriguez Suarez, M.; Marco Arboli, M.; Menarguez, J.

    2003-01-01

    An important point of the actions inside the European framework to achieve the harmonisation of the training programmes and recognition was included in the European directive 96/29/Euratom which includes definition and specific tasks of the European Qualified Expert on Radiation Protection (RP). Basic syllabus for training of those experts was developed in the communication 98/C 133/03 concerning BSS applications. Although, in the Spanish education system, the training and recognition requirements of the high level qualified experts on RP was defined since 1977, until 2001, the figure of the Technical Qualified Expert on RP does not appear in the legal framework. In December 2002, a new regulation of the Spanish Regulatory Body, CSN, about qualifications to obtain the recognition of RP Expert in Spain (both high qualified and technical RP experts) was published. Concerning the qualified expert on RP, (RP Officer), responsible of the RP Service, which takes charge of the effective protection and advise radioactive and nuclear facilities in Rp aspects,has to be authorised by the regulatory body. to obtain the RP officer diploma, conceded by the CSN, an initial training of 300 hours and a three-year minimum experience are required (for X-ray installation a 6-month experience is enough). The technical qualified expert on RP is the worker who carried out the tasks in the a RP Service under the supervision of the RP officer. A Technician Qualified Expert on RP does not need an specific accreditation of the Regulatory Body, but an initial RP training and a three-month minimum experience are required and has hold a certificate by the RP officer. Continuous training is also required and as well has to receive a certificate from the RP officer. Since 1977, The Institute for energy Studies has been implementing specific training courses for those professionals who want to obtain the diploma of RP officer (high degree qualified RP expert), conceded by the CSN. Since then

  20. Groundwater quality monitoring well installation for Lower Waste Area Grouping 2 at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Environmental Restoration Program

    International Nuclear Information System (INIS)

    Mortimore, J.A.; Lee, T.A.

    1994-09-01

    This report documents the drilling and installation of 11 groundwater quality monitoring (GQM) wells on the perimeter of Lower Waste Area Grouping (WAG) 2. Lower WAG 2 consists of White Oak Lake and the embayment below White Oak Dam above the Clinch River. The wells in Lower WAG 2 were drilled and developed between December 1989 and September 1990. These wells were installed to characterize and assess the WAG in accordance with applicable Department of Energy, state, and Environmental Protection Agency regulatory requirements. The wells at Lower WAG 2 were drilled with auger or air rotary rigs. Depending on the hydrogeologic conditions present at each proposed well location, one of three basic installation methods was utilized. Detailed procedures for well construction were specified by the Engineering Division to ensure that the wells would provide water samples representative of the aquifer. To ensure conformance with the specifications, Energy Systems Construction Engineering and ERCE provided continuous oversight of field activities. The purpose of the well installation program was to install GQM wells for groundwater characterization at Lower WAG 2. Data packages produced during installation activities by the ERCE hydrogeologists are an important product of the program. These packages document the well drilling, installation, and development activities and provide valuable data for well sampling and WAG characterization. The forms contained in the packages include predrilling and postdrilling checklists, drilling and construction logs, development and hydraulic conductivity records, and quality control-related documents

  1. Training and certification of PV installers in Europe

    International Nuclear Information System (INIS)

    Tsoutsos, Theocharis; Tournaki, Stavroula; Gkouskos, Zacharias; Masson, Gaetan; Holden, John; Huidobro, Ana; Stoykova, Evelina; Rata, Camelia; Bacan, Andro; Maxoulis, Christos; Charalambous, Anthi

    2013-01-01

    The European strategy for the coming decades sets specific targets for a sustainable growth, including reaching a 20% share of renewables in final energy consumption till 2020. To achieve this target, a number of initiatives and measures have been in force. Europe, is currently the largest market for PV systems with more than 75% of the annual worldwide installations in 2011. The favourable European policies as well as the Member States’ supporting legislations have resulted in high market growth for photovoltaics. Applying PV technologies however, requires high qualified technicians to install, repair and maintain them. Until today, national markets have been growing faster than the skilled PV installers force can satisfy. The PVTRIN, an Intelligent Energy Europe action, addresses these issues by developing a training and certification scheme for technicians active in the installation and maintenance of small scale PV systems. During the implementation of the action, a market research was conducted in the six participating countries in order to record the stakeholders’ attitudes, perceptions and considerations and to adapt the training methods, tools and materials to the national PV industry requirements and markets’ needs. Indicative results of this analysis as well as the current situation regarding relevant training and certification schemes are presented in this paper. - Highlights: ► Market research in six EU countries on PV professional Training and Certification needs. ► PVTRIN scheme integrates the national legislations and the market's needs. ► The different aspects (technical, institutional, financial) are presented

  2. DATA QUALIFICATION REPORT: WATER-LEVEL DATA FROM THE NYE COUNTY EARLY WARNING DRILLING PROGRAM

    Energy Technology Data Exchange (ETDEWEB)

    F. H. Dove, P. Sanchez, and L. Saraka

    2000-04-21

    The objective of this work is to evaluate unqualified, water-level data gathered under the Nye County Early Warning Drilling Program (EWDP) and to determine whether the status of the data should be changed to ''qualified'' data in accordance with AP-SIII.2Q (Qualification of Unqualified Data and the Documentation of Rationale for Accepted Data). The corroboration method (as defined in Attachment 2 of AP-SIII.2Q) was implemented to qualify water-level data from Nye County measurements obtained directly from the Nye County Nuclear Waste Repository Program Office (NWRPO). Comparison of United States Geological Survey (USGS) measurements contained in DTN GS990608312312.003 with the Nye County water-level data has shown that the differences in water-level altitudes for the same wells are significantly less than 1 meter. This is an acceptable finding. Evaluation and recommendation criteria have been strictly applied to qualify Nye County measurements of water levels in selected wells measured by the USGS. However, the process of qualifying measured results by corroboration also builds confidence that the Nye County method for measurement of water levels is adequate for the intended use of the data (which is regional modeling). Therefore, it is reasonable to extend the term of ''qualified'' to water-level measurements in the remaining Nye County Phase I wells on the basis that the method has been shown to produce adequate results for the intended purpose of supporting large-scale modeling activities for the Yucca Mountain Project (YMP). The Data Qualification Team recommends the Nye County, water-level data contained in Appendix D of this report be designated as ''qualified''. These data document manual measurements of water-levels in eight (8) EWDP Phase I drillholes that were obtained prior to the field installation of continuous monitoring equipment.

  3. DATA QUALIFICATION REPORT: WATER-LEVEL DATA FROM THE NYE COUNTY EARLY WARNING DRILLING PROGRAM

    International Nuclear Information System (INIS)

    F. H. Dove, P. Sanchez, and L. Saraka

    2000-01-01

    The objective of this work is to evaluate unqualified, water-level data gathered under the Nye County Early Warning Drilling Program (EWDP) and to determine whether the status of the data should be changed to ''qualified'' data in accordance with AP-SIII.2Q (Qualification of Unqualified Data and the Documentation of Rationale for Accepted Data). The corroboration method (as defined in Attachment 2 of AP-SIII.2Q) was implemented to qualify water-level data from Nye County measurements obtained directly from the Nye County Nuclear Waste Repository Program Office (NWRPO). Comparison of United States Geological Survey (USGS) measurements contained in DTN GS990608312312.003 with the Nye County water-level data has shown that the differences in water-level altitudes for the same wells are significantly less than 1 meter. This is an acceptable finding. Evaluation and recommendation criteria have been strictly applied to qualify Nye County measurements of water levels in selected wells measured by the USGS. However, the process of qualifying measured results by corroboration also builds confidence that the Nye County method for measurement of water levels is adequate for the intended use of the data (which is regional modeling). Therefore, it is reasonable to extend the term of ''qualified'' to water-level measurements in the remaining Nye County Phase I wells on the basis that the method has been shown to produce adequate results for the intended purpose of supporting large-scale modeling activities for the Yucca Mountain Project (YMP). The Data Qualification Team recommends the Nye County, water-level data contained in Appendix D of this report be designated as ''qualified''. These data document manual measurements of water-levels in eight (8) EWDP Phase I drillholes that were obtained prior to the field installation of continuous monitoring equipment

  4. Highly qualified in the Czech Republic

    Directory of Open Access Journals (Sweden)

    Renata Čuhlová

    2017-05-01

    Full Text Available The paper aims to analyse the current situation of the highly qualified in the Czech Republic applying the ISCO qualification. Previous studies suggest that educational attainment has an important impact on labour market performance and national competitiveness. Data analyses approved that highly qualified workforce positively influences economic situation of the EU–15 Member States they work in. However, this hypothesis was disapproved for the EU–10+3 Member States joining the EU after 2004. The difference can be explained by the various stage in convergence process since some New Member States are still in transformation period. We positively appraise the significant growth of fraction of the highly qualified in the Czech Republic since 2004, especially in the major group Professionals involving the most qualified workforce. The same trend happened also for the highly qualified foreigners in the Czech Republic, however their attracting still remains a challenge.

  5. 26 CFR 1.30-1 - Definition of qualified electric vehicle and recapture of credit for qualified electric vehicle.

    Science.gov (United States)

    2010-04-01

    ... qualified electric vehicle. A qualified electric vehicle is a motor vehicle that meets the requirements of section 30(c). Accordingly, a qualified electric vehicle does not include any motor vehicle that has ever been used (for either personal or business use) as a non-electric vehicle. (b) Recapture of credit for...

  6. 11 CFR 9002.11 - Qualified campaign expense.

    Science.gov (United States)

    2010-01-01

    ... 11 Federal Elections 1 2010-01-01 2010-01-01 false Qualified campaign expense. 9002.11 Section 9002.11 Federal Elections FEDERAL ELECTION COMMISSION PRESIDENTIAL ELECTION CAMPAIGN FUND: GENERAL ELECTION FINANCING DEFINITIONS § 9002.11 Qualified campaign expense. (a) Qualified campaign expense means...

  7. 11 CFR 9032.9 - Qualified campaign expense.

    Science.gov (United States)

    2010-01-01

    ... 11 Federal Elections 1 2010-01-01 2010-01-01 false Qualified campaign expense. 9032.9 Section 9032.9 Federal Elections FEDERAL ELECTION COMMISSION PRESIDENTIAL ELECTION CAMPAIGN FUND: PRESIDENTIAL PRIMARY MATCHING FUND DEFINITIONS § 9032.9 Qualified campaign expense. (a) Qualified campaign expense...

  8. The Fabrication of Qualified Citizens

    DEFF Research Database (Denmark)

    Andrade-Molina, Melissa

    2017-01-01

    a rhizomatic analytical move, a historization of the present is deployed to map the fabrication of the desired qualified citizen in Chile. The analysis evidences the (re)production of dominant narratives about the “qualified citizen” are and have been entangled with the functioning of school geometry...

  9. Suitcase to Audit Solar Installations

    Energy Technology Data Exchange (ETDEWEB)

    Alberdi, J.; Barcala, J.M.; Blas de, J.; Molinero, A.; Navarrete, J.J.; Yuste, C.

    2001-07-01

    The audit suitcase was proposed by BESEL to introduce in the solar energy market a new tool which can make an evaluation of solar installation efficiency. Non-invasive sensors and low power components permit both easy installation of the devices and data storage for a period as long as ten days. This project was funded by the contract JOR3-CT98-7030 of the European Union JOULE III program. (Author)

  10. Suitcase to Audit Solar Installations

    International Nuclear Information System (INIS)

    Alberdi, J.; Barcala, J. M.; Blas, J. de; Molinero, A.; Navarrete, J. J.; Yuste, C.

    2001-01-01

    The audit suitcase was proposed by BESEL to introduce in the solar energy market a new tool which can make an evaluation of solar installation efficiency. Non-invasive sensors and low power components permit both easy installation of the devices and data storage for a period as long as ten days. This project was funded by the contract JOR3-CT98-7030 of the European Union JOULE III program. (Author)

  11. Evaluation of Installation Time for SMASHmount by SMASHsolar

    Energy Technology Data Exchange (ETDEWEB)

    2017-04-05

    The Department of Energy SunShot Incubator program provides early-stage assistance to help startup companies cross technological barriers to commercialization while encouraging private sector investment. The SunShot Incubator program aims to shorten the time it takes for a young business or company to develop an innovative product concept and make it commercially available, which includes product prototyping, deployment, and, potentially, manufacturing. SMASHsolar was selected as an Incubator awardee to develop a simple, snap-together, module-integrated photovoltaic (PV) mounting system in attempts to dramatically reduce the time, effort and skill needed to install rooftop solar. In support of this award, the National Renewable Energy Laboratory worked with SMASHsolar to develop a procedure for evaluating the installation time required for the SMASHmount system vs. widely-available rail systems. Amongst several installations, NREL measured the following installation times, subject to the qualifications and conditions described later in this report. NREL found that the SMASHsolar SMASHmount system was installed between 15% and 37% faster than tested competing systems after one or two installations of the system.

  12. Skills upgrading for newly qualified surgeon: Is the district hospital in ...

    African Journals Online (AJOL)

    With adequate surgical activity in these settings, the trainee's confidence is boosted to the point of independence. This skill acquisition is a continuous process, especially so for those who qualify from an exit training program like the one at the University of Nairobi (UON). The continuity is maintained for two years after.

  13. Hiring and keeping qualified personnel in a growing regulatory organisation

    International Nuclear Information System (INIS)

    Marchildon, P.

    1993-01-01

    Although no new nuclear stations are currently committed in Canada, the regulatory authority, the Atomic Energy Control Board (AECB), has started, in 1989, an expansion program which, when completed in 1994 will represent a 60 pc increase in its workforce. The new personnel resources are being used to improve the AECB effectiveness in a number of regulatory activities. This paper reviews some of the key factors which relate to the hiring and integration of the new AECB employees: selection process, timing, fees, scholarship program, subsequent training of qualified personnel, woman quotas. 2 figs

  14. 21 CFR 516.141 - Qualified expert panels.

    Science.gov (United States)

    2010-04-01

    ... choose members for the qualified expert panel in accordance with selection criteria listed in paragraph... whether the proposed qualified expert panel meets the selection criteria prior to the panel beginning its... Committee Act, as amended, 5 U.S.C. App. (b) Criteria for the selection of a qualified expert panel. (1) A...

  15. Preliminary assessment report for Grubbs/Kyle Training Center, Smyrna/Rutherford County Regional Airport, Installation 47340, Smyrna, Tennessee. Installation Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    Dennis, C.; Stefano, J.

    1993-07-01

    This report presents the results of the preliminary assessment (PA) conducted by Argonne National Laboratory at the Tennessee Army National Guard (TNARNG) property near Smyrna, Tennessee. Preliminary assessments of federal facilities are being conducted to compile the information necessary for completing preremedial activities and to provide a basis for establishing corrective actions in response to releases of hazardous substances. The principal objective of the PA is to characterize the site accurately and determine the need for further action by examining site activities, quantities of hazardous substances present, and potential pathways by which contamination could affect public health and the environment. This PA satisfies, for the Grubbs/Kyle Training Center property, the requirement of the Department of Defense Installation Restoration Program.

  16. Jet Propulsion Laboratory/NASA Lewis Research Center space qualified hybrid high temperature superconducting/semiconducting 7.4 GHz low-noise downconverter for NRL HTSSE-II program

    International Nuclear Information System (INIS)

    Javadi, H.H.S.; Bowen, J.G.; Rascoe, D.L.; Chorey, C.M.

    1996-01-01

    A deep space satellite downconverter receiver was proposed by Jet Propulsion Laboratory (JPL) and NASA Lewis Research Center (LeRC) for the Naval Research Laboratory's (NRL) high temperature superconductivity space experiment, phase-II (HTSSE-II) program. Space qualified low-noise cryogenic downconverter receivers utilizing thin-film high temperature superconducting (HTS) passive circuitry and semiconductor active devices were developed and delivered to NRL. The downconverter consists of an HTS preselect filter, a cryogenic low-noise amplifier, a cryogenic mixer, and a cryogenic oscillator with an HTS resonator. HTS components were inserted as the front-end filter and the local oscillator resonator for their superior 77 K performance over the conventional components. The semiconducting low noise amplifier also benefited from cooling to 77 K. The mixer was designed specifically for cryogenic applications and provided low conversion loss and low power consumption. In addition to an engineering model, two space qualified units (qualification, flight) were built and delivered to NRL. Manufacturing, integration and test of the space qualified downconverters adhered to the requirements of JPL class-D space instruments and partially to MIL-STD-883D specifications. The qualification unit has ∼50 K system noise temperature which is a factor of three better than a conventional downconverter at room temperature

  17. 30 CFR 817.180 - Utility installations.

    Science.gov (United States)

    2010-07-01

    ... PERMANENT PROGRAM PERFORMANCE STANDARDS PERMANENT PROGRAM PERFORMANCE STANDARDS-UNDERGROUND MINING ACTIVITIES § 817.180 Utility installations. All underground mining activities shall be conducted in a manner...; oil, gas, and coal-slurry pipelines, railroads; electric and telephone lines; and water and sewage...

  18. 33 CFR 155.1026 - Qualified individual and alternate qualified individual.

    Science.gov (United States)

    2010-07-01

    ... familiar with the implementation of the vessel response plan; and (4) Be trained in the responsibilities of... vessel may designate an organization to fulfill the role of the qualified individual and alternate...

  19. 42 CFR 495.202 - Identification of qualifying MA organizations, MA-EPs and MA-affiliated eligible hospitals.

    Science.gov (United States)

    2010-10-01

    ... qualifying MA-affiliated eligible hospitals under the MA EHR incentive program are required to identify...-EPs and MA-affiliated eligible hospitals. 495.202 Section 495.202 Public Health CENTERS FOR MEDICARE... STANDARDS FOR THE ELECTRONIC HEALTH RECORD TECHNOLOGY INCENTIVE PROGRAM Requirements Specific to Medicare...

  20. Climate Change Planning for Military Installations: Findings and Implications

    Science.gov (United States)

    2010-10-01

    climate change as an emerging issue with potential national security implications. As a result of these concerns, the DoD Strategic Environmental Research and Development Program (SERDP) is establishing a research and development program to address climate change effects on DoD installations and associated missions. To help establish the program, SERDP tasked Noblis to identify potential climate change effects on military installations and their missions and operations. This report presents the findings portion of this study and

  1. Reflections on the newly qualified social worker's journey : From university training to qualified practice

    OpenAIRE

    Walker, Clare

    2014-01-01

    This qualitative research study explores the experience of graduating social workers making the transition from university training into work as qualified social work practitioners. Most studies in this area look at the practice readiness of the newly qualified professional. This study looks at the participants’ experience in the work place. How do participants experience this journey of transition? What skills, particularly reflective practice and supervision, learned in training, are import...

  2. 33 CFR 154.1026 - Qualified individual and alternate qualified individual.

    Science.gov (United States)

    2010-07-01

    ... alternate must: (1) Be located in the United States; (2) Speak fluent English; (3) Be familiar with the... facility may designate an organization to fulfill the role of the qualified individual and the alternate...

  3. Wanted, A National Teacher Supply Policy for Education:The Right Way to Meet The "Highly Qualified Teacher" Challenge

    Directory of Open Access Journals (Sweden)

    Linda Darling-Hammond

    2003-09-01

    Full Text Available Teacher quality is now the focus of unprecedented policy analysis. To achieve its goals, the No Child Left Behind Act (NCLB requires a “highly qualified teacher” in all classrooms. The concern with teacher quality has been driven by a growing recognition, fueled by accumulating research evidence, of how critical teachers are to student learning. To acquire and retain high-quality teachers in our Nation’s classrooms will require substantial policy change at many levels. There exists longstanding precedent and strong justification for Washington to create a major education manpower program. Qualified teachers are a critical national resource that requires federal investment and cross-state coordination as well as other state and local action. NCLB provides a standard for equitable access to teacher quality that is both reasonable and feasible. Achieving this goal will require a new vision of the teacher labor market and the framing of a national teacher supply policy. States and local districts have vital roles to play in ensuring a supply of highly qualified teachers; however, they must be supported by appropriate national programs. These programs should be modeled on U.S. medical manpower efforts, which have long supplied doctors to high- need communities and eased shortages in specific health fields. We argue that teacher supply policy should attract well-prepared teachers to districts that sorely need them while relieving shortages in fields like special education, math and the physical sciences. We study the mal-distribution of teachers and examine its causes. We describe examples of both states and local school districts that have fashioned successful strategies for strengthening their teaching forces. Unfortunately, highly successful state and local program to meet the demand for qualified teachers are the exception rather than the rule. They stand out amid widespread use of under-prepared teachers and untrained aides, mainly for

  4. Reconstruction efficiency and precision for the events detected by the BIS-2 installation using the Perun pattern recognition program

    International Nuclear Information System (INIS)

    Burilkov, D.T.; Genchev, V.I.; Markov, P.K.; Likhachev, M.F.; Takhtamyshev, G.G.; Todorov, P.T.; Trayanov, P.K.

    1982-01-01

    Results of studying the efficiency and accuracy of the track and event reconstruction with the Perun pattern recognition program used in the experiments carried out at the BIS-2 installation are presented. The Monte Carlo method is used for simulating the processes of neutron interactions with matter. The con-- clusion is made that the Perun program correctly, with good accuracy and high efficiency reconstructs complex multiparticle events [ru

  5. Annual Radiological Environmental Monitoring Program Report for the Three Mile Island, Unit 2, Independent Spent Fuel Storage Installation

    International Nuclear Information System (INIS)

    Hall, Gregory Graham

    2002-01-01

    This report presents the results of the 2001 Radiological Environmental Monitoring Program conducted in accordance with 10 CFR 72.44 for the Three Mile Island, Unit 2, Independent Spent Fuel Storage Installation. A description of the facility and the monitoring program is provided. The results of monitoring the two predominant radiation exposure pathways, potential airborne radioactivity releases and direct radiation exposure, indicate the facility operation has not contributed to any increase in the estimated maximum potential dose commitment to the general public.

  6. Final report on the waste area grouping perimeter groundwater quality monitoring well installation program at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    Greene, J.A.

    1991-06-01

    A groundwater quality monitoring well installation program was conducted at Oak Ridge National Laboratory (ORNL) to meet the requirements of environmental regulations, including the Resource Conservation and Recovery Act (RCRA) and the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). A total of 173 wells were installed and developed at 11 different waste area groupings (WAGs) between June 1986 and November 1990. A location map of the wells is included

  7. 11 CFR 9004.4 - Use of payments; examples of qualified campaign expenses and non-qualified campaign expenses.

    Science.gov (United States)

    2010-01-01

    ... 11 Federal Elections 1 2010-01-01 2010-01-01 false Use of payments; examples of qualified campaign expenses and non-qualified campaign expenses. 9004.4 Section 9004.4 Federal Elections FEDERAL ELECTION COMMISSION PRESIDENTIAL ELECTION CAMPAIGN FUND: GENERAL ELECTION FINANCING ENTITLEMENT OF ELIGIBLE CANDIDATES...

  8. Nominal Group as Qualifier to "Someone"

    Science.gov (United States)

    Sujatna, Eva Tuckyta Sari; Wahyuni, Sri

    2017-01-01

    The paper titled "Nominal Group as Qualifier to 'Someone'" investigated types of qualifiers which are embedded to the head "someone" in a nominal group. This research was conducted in the light of Systemic Functional Linguistics analysis. The data was analyzed, classified then described using descriptive qualitative method.…

  9. 30 CFR 75.155 - Qualified hoisting engineer; qualifications.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Qualified hoisting engineer; qualifications. 75... Persons § 75.155 Qualified hoisting engineer; qualifications. (a)(1) A person is a qualified hoisting engineer within the provisions of subpart O of this part, for the purpose of operating a steam-driven hoist...

  10. Generic requirements specification for qualifying a commercially available PLC for safety-related applications in nuclear power plants. Final report

    International Nuclear Information System (INIS)

    Ostenso, A.; May, R.

    1996-12-01

    This is a specification for qualifying a commercially available PLC for application to safety systems in nuclear power plants. The specifications are suitable for evaluating a particular PLC product line as a platform for safety-related applications, establishing a suitable qualification test program, and confirming that the manufacturer has a quality assurance program that is adequate for safety-related applications or is sufficiently complete that, with a reasonable set of compensatory actions, it can be brought into conformance. The specification includes requirements for: (1) quality assurance measures applied to the qualification activities, (2) documentation to support the qualification, and (3) documentation to provide the information needed for applying the qualified PLC platform to a specific application. The specifications are designed to encompass a broad range of safety applications; however, qualifying a particular platform for a different range of applications can be accomplished by appropriate adjustments to the requirements

  11. Qualified Census Tracts

    Data.gov (United States)

    Department of Housing and Urban Development — A Qualified Census Tract (QCT) is any census tract (or equivalent geographic area defined by the Census Bureau) in which at least 50% of households have an income...

  12. 26 CFR 1.132-9 - Qualified transportation fringes.

    Science.gov (United States)

    2010-04-01

    ... 26 Internal Revenue 2 2010-04-01 2010-04-01 false Qualified transportation fringes. 1.132-9... Qualified transportation fringes. (a) Table of contents. This section contains a list of the questions and answers in § 1.132-9. (1) General rules. Q-1. What is a qualified transportation fringe? Q-2. What is...

  13. Lifetime Management Programs as a basis for the long term operation of nuclear installations

    Energy Technology Data Exchange (ETDEWEB)

    López González, Manuel; Lobato Galeote, Carlos, E-mail: mlopezg@idom.com, E-mail: carlos.lobato@idom.com [IDOM - Consulting, Engineering & Architecture SAU, Madrid (Spain)

    2017-07-01

    From the licensing standpoint there are several approaches worldwide to obtain an authorization to operate a NPP beyond its design life. According to the License Renewal Application (LRA) approach, followed in the United States of America and another countries, plants need to develop a Life Time Management Program (LTMP) with which manage the potential aging processes (corrosion, erosion, erosion-corrosion, radiation and thermally induced embrittlement, fatigue, corrosion fatigue, creep, binding and wear) associated to the Structures, Systems and Components. A LTMP is composed of several tasks which represents a technical challenge for a nuclear installation. (author)

  14. Lifetime Management Programs as a basis for the long term operation of nuclear installations

    International Nuclear Information System (INIS)

    López González, Manuel; Lobato Galeote, Carlos

    2017-01-01

    From the licensing standpoint there are several approaches worldwide to obtain an authorization to operate a NPP beyond its design life. According to the License Renewal Application (LRA) approach, followed in the United States of America and another countries, plants need to develop a Life Time Management Program (LTMP) with which manage the potential aging processes (corrosion, erosion, erosion-corrosion, radiation and thermally induced embrittlement, fatigue, corrosion fatigue, creep, binding and wear) associated to the Structures, Systems and Components. A LTMP is composed of several tasks which represents a technical challenge for a nuclear installation. (author)

  15. Ship and Installation Program: Optimal Stationing of Naval Ships

    National Research Council Canada - National Science Library

    Colgary, Katherine A; Willett, Devon K

    2006-01-01

    .... Using constraints that maintain adequate pier capacity and unique capability installation, Configuration Analysis seeks to maximize a measure of military value while penalizing excess capacity...

  16. Qualified Empathy - Project Report 2015-16

    DEFF Research Database (Denmark)

    Austring, Bennye Düranc; Sørensen, Merete Cornet

    2016-01-01

    UCSJ-delen af den afsluttende rapport fra Nordplus-projektet "Qualified Empathy", der blev gennemført sammen med Metropolia, Helsinki, og NTNU, Trondheim, i 2015 og 15.......UCSJ-delen af den afsluttende rapport fra Nordplus-projektet "Qualified Empathy", der blev gennemført sammen med Metropolia, Helsinki, og NTNU, Trondheim, i 2015 og 15....

  17. Exploring the Gap between a Pre- and Post-Installation of a Corporate E-Learning Program in an Accounting Workplace

    Science.gov (United States)

    Cheng, Kai-Wen

    2013-01-01

    Although earlier concentration has addressed the use of corporate e-learning programs (CELP), the dissimilitude between pre and post installation reaction to CELP is less explored. This study adopted a two-phase investigation to survey learner intention to use CELP and actual behavior within an international accounting firm. In the…

  18. 26 CFR 1.42-6 - Buildings qualifying for carryover allocations.

    Science.gov (United States)

    2010-04-01

    ... 26 Internal Revenue 1 2010-04-01 2010-04-01 true Buildings qualifying for carryover allocations. 1... INCOME TAXES Credits Against Tax § 1.42-6 Buildings qualifying for carryover allocations. (a) Carryover... carryover allocation may only be made with respect to a qualified building. A qualified building is any...

  19. 26 CFR 1.43-4 - Qualified enhanced oil recovery costs.

    Science.gov (United States)

    2010-04-01

    ... 26 Internal Revenue 1 2010-04-01 2010-04-01 true Qualified enhanced oil recovery costs. 1.43-4... TAXES Credits Against Tax § 1.43-4 Qualified enhanced oil recovery costs. (a) Qualifying costs—(1) In... “qualified enhanced oil recovery costs” if the amounts are paid or incurred with respect to an asset which is...

  20. Low-level waste cement solidification design, installation, and start-up

    International Nuclear Information System (INIS)

    Jezek, G.R.

    1988-08-01

    This report describes the design, installation, and start-up activities of the Cement Solidification System (CSS) at the West Valley Demonstration Project (WVDP), West Valley, New York. The CSS, designed to operate within an existing process cell, automatically and remotely solidifies low-level nuclear waste by mixing it with Portland Type I cement. The qualified waste form mixture is placed into square, 270-litre (71-gallon) metal drums. The drums have an integral polyethylene liner to protect the carbon-steel material from potential corrosion. The CSS produces drums at a continuous operation rate of four drums per hour. All system processing data is monitored by a computerized Data Acquisition System (DAS). 6 figs

  1. 12 CFR 621.4 - Audit by qualified public accountant.

    Science.gov (United States)

    2010-01-01

    ... 12 Banks and Banking 6 2010-01-01 2010-01-01 false Audit by qualified public accountant. 621.4... REQUIREMENTS General Rules § 621.4 Audit by qualified public accountant. (a) Each institution shall, at least annually, have its financial statements audited by a qualified public accountant in accordance with...

  2. Certification for Small Wind Turbine Installers: What's the Hang Up?; Preprint

    Energy Technology Data Exchange (ETDEWEB)

    Oteri, F.; Sinclair, K.

    2012-03-01

    Several programs have been implemented to support the advancement of a professional, mature small wind industry and to ensure that this industry moves forward in a sustainable direction. The development of a standard for small wind turbine systems and the creation of the Small Wind Certification Council support small wind technology that is reliable and safe. Consumers and incentive programs will ultimately rely on certification to differentiate among systems sold in the U.S. market. Certification of small wind installers is yet another component deemed necessary for this industry to expand. The National Renewable Energy Laboratory, under the guidance and funding support of the U.S. Department of Energy, supported the development of small wind system installer certification provided via the North American Board of Certified Energy Practitioners. However, the small wind community is not supportive of the installer certification. There are currently only nine certified installers in the U.S. pool. This paper provides an overview of the installer certification program and why more small wind turbine installers are not pursuing this certification.

  3. 47 CFR Appendix A to Part 400 - Minimum Grant Awards Available to Qualifying States

    Science.gov (United States)

    2010-10-01

    ... ADMINISTRATION, DEPARTMENT OF COMMERCE, AND NATIONAL HIGHWAY TRAFFIC SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION E-911 GRANT PROGRAM Pt. 400, App. A Appendix A to Part 400—Minimum Grant Awards Available to Qualifying States State name Minimum E-911grant award Alabama $686,230.25 Alaska 500,000.00 American Samoa...

  4. 26 CFR 1.7704-3 - Qualifying income.

    Science.gov (United States)

    2010-04-01

    ... 26 Internal Revenue 13 2010-04-01 2010-04-01 false Qualifying income. 1.7704-3 Section 1.7704-3 Internal Revenue INTERNAL REVENUE SERVICE, DEPARTMENT OF THE TREASURY (CONTINUED) INCOME TAX (CONTINUED) INCOME TAXES General Actuarial Valuations § 1.7704-3 Qualifying income. (a) Certain investment income—(1...

  5. Brazilian Irradiation Project: CAFE-MOD1 validation experimental program

    International Nuclear Information System (INIS)

    Mattos, Joao Roberto Loureiro de; Costa, Antonio Carlos L. da; Esteves, Fernando Avelar; Dias, Marcio Soares

    1999-01-01

    The Brazilian Irradiation Project whose purpose is to provide Brazil with a minimal structure to qualify the design, fabrication and quality procedures of nuclear fuels, consists of three main facilities: IEA-R1 reactor of IPEN-CNEN/SP, CAFE-MOD1 irradiation device and a unit of hot cells. The CAFE-MOD1 is based on concepts successfully used for more than 20 years in the main nuclear institutes around the world. Despite these concepts are already proved it should be adapted to each reactor condition. For this purpose, there is an ongoing experimental program aiming at the certification of the criteria and operational limits of the CAFE-MOD1 in order to get the allowance for its installation at the IEA-R1 reactor. (author)

  6. Presentation of the Vulcano installation which uses a plasma transferred arc rotary furnace for corium melting

    International Nuclear Information System (INIS)

    Cognet, G.; Laffont, G.; Jegou, C.; Pierre, J.; Journeau, C.; Sudreau, F.; Roubaud, A.

    1998-01-01

    In the case of loss coolant accident, the reactor core could melt and turn into a mixture of uranium oxides, zirconium, iron and steel called corium. A large experimental program has been launched to study corium behaviour, to qualify solutions to stabilize it and to confine it in the reactor containment. The Vulcano installation has been designed to that purpose. It is made up of: i) a plasma transferred arc rotary furnace, ii) a testing surface covered with refractory materials, iii) an induction heating system in order to simulate the residual power of corium, iv) instrumentation devices such as video cameras, thermocouples, infra-red pyrometers and flowmeters, and v) a laboratory to perform chemical analysis of corium samples. The first experimental results show that a mixture of corium and concrete spreads better than expected. It seems that a low initial height of matter can produce a great distance flowing while having a chaotic behaviour. This characteristic suggests that the mixture acts as a Bingham type threshold fluid. (A.C.)

  7. Accident data study of concrete construction companies' similarities and differences between qualified and non-qualified workers in Spain.

    Science.gov (United States)

    López-Arquillos, Antonio; Rubio-Romero, Juan Carlos; Gibb, Alistair

    2015-01-01

    The aim of this paper is to discuss findings from an analysis of accidents in concrete construction companies in Spain and to compare the accident rates of qualified and non-qualified workers. A total of 125,021 accidents between 2003 and 2008 involving both blue-collar and white-collar workers were analysed, comparing the variables of occupation, age, company staff, length of service, location of the accident, together with the severity of the accidents. Results showed that lack of experience in the first month is more significant in non-qualified workers and experienced supervisors and that head injuries are more likely to lead to fatalities. The most remarkable similarity was that fatal accidents to and from the worksite are a problem common to both groups of workers.

  8. 26 CFR 52.4682-2 - Qualifying sales.

    Science.gov (United States)

    2010-04-01

    ... 26 Internal Revenue 17 2010-04-01 2010-04-01 false Qualifying sales. 52.4682-2 Section 52.4682-2... TAXES (CONTINUED) ENVIRONMENTAL TAXES § 52.4682-2 Qualifying sales. (a) In general—(1) Special rules applicable to certain sales. Special rules apply to sales of ODCs in the following cases: (i) Under section...

  9. Examining educators of the deaf as "highly qualified" teachers: roles and responsibilities under IDEA and NCLB.

    Science.gov (United States)

    Luft, Pamela

    2008-01-01

    Educators of the deaf were long considered "highly qualified" if they obtained state licensure from approved deaf education programs. But the No Child Left Behind Act (2001) redefined qualifications based on core academic content areas, without recognizing disability-specific expertise. NCLB's reauthorization will provide opportunities for examining definitions of "highly qualified" and ensuring that both general and special educators are appropriately prepared. Under the Individuals With Disabilities Education Act, educators of the deaf are primarily responsible for supporting implementation of each assigned student's individualized education program. When done skillfully and knowledgeably, IEP execution maximizes learning outcomes, and therefore would support NCLB mandates for improved student achievement. Instead of academic attainment alone, the primary "qualification" of educators of the deaf should be training and expertise in providing communication, learning, and assistive technology supports that allow access to academic content and, ultimately, address deaf students' historical underachievement.

  10. 6 CFR 25.4 - Designation of qualified anti-terrorism technologies.

    Science.gov (United States)

    2010-01-01

    ... 6 Domestic Security 1 2010-01-01 2010-01-01 false Designation of qualified anti-terrorism... REGULATIONS TO SUPPORT ANTI-TERRORISM BY FOSTERING EFFECTIVE TECHNOLOGIES § 25.4 Designation of qualified anti-terrorism technologies. (a) General. The Under Secretary may Designate as a Qualified Anti-Terrorism...

  11. 12 CFR 619.9270 - Qualified Public Accountant or External Auditor.

    Science.gov (United States)

    2010-01-01

    ... 12 Banks and Banking 6 2010-01-01 2010-01-01 false Qualified Public Accountant or External Auditor... § 619.9270 Qualified Public Accountant or External Auditor. A qualified public accountant or external... constituted State authority, identifying such person as a certified public accountant; (b) Is licensed to...

  12. Computer systems for nuclear installation data control

    International Nuclear Information System (INIS)

    1987-09-01

    The computer programs developed by Divisao de Instalacoes Nucleares (DIN) from Brazilian CNEN for data control on nuclear installations in Brazil are presented. The following computer programs are described: control of registered companies, control of industrial sources, irradiators and monitors; control of liable person; control of industry irregularities; for elaborating credence tests; for shielding analysis; control of waste refuge [pt

  13. Installation and Preliminary Test of the Ion Accelerator for the Surface Analysis at KOMAC

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Dae Il; Ahn, Tae Sung; Seo, Dong Hyuk; Kwon, Hyeok Jung; Kim, Cho Rong; Park, Jun Kue; Cho, Yong Sub [KAERI, Daejeon (Korea, Republic of)

    2016-05-15

    An electrostatic tandem accelerator, which had been operating over 25 years at KIGAM (Korea Institute of Geoscience and Mineral Resources), is moved to KOMAC (Korea Multi-purpose Accelerator Complex) last year. For the purpose of supplying the qualified and quantified data from the irradiated species as part of the user service of KOMAC. The accelerator is a pelletron with tandem type. The ion accelerator for surface analysis was moved at KOMAC last year. The installation with alignment was done. The conditioning of high voltage was operated up to 1.7 MV. The beam transmission to PIXE beam line was achieved as 51%.

  14. Development of a quality management system for Brazilian nuclear installations

    International Nuclear Information System (INIS)

    Kibrit, Eduardo; Zouain, Desiree Moraes

    2005-01-01

    The present work is a proposal for developing a quality management system for Brazilian nuclear installations, based on applicable standards. The standard ISO 9001:2000 [4] establishes general requirements for the implementation of a quality management system in all kinds of organizations. The standard IAEA 50-C/SG-Q [1] establishes general requirements for the implementation of a quality assurance system in nuclear installations. The standard CNEN-NN- 1.16 [5] establishes the regulating requirements for the quality assurance systems and programs of nuclear installations, for licensing and authorization for operation of these installations in Brazil. The revision of standard IAEA 50-C/SG-Q [1], to be replaced by IAEA DS 338 [2] and IAEA DPP 349 [3], introduces the concept of 'Integrated Management System' for the nuclear area, in preference to the concept of 'Quality Assurance'. This approach is incorporated with the current tendency, because it guides the system to manage, in an integrated way, the requirements of quality, safety, health, environment, security and economics of the installation. The results of the characterization of the quality management systems established in the applicable standards are presented, with the determination of the common and conflicting points among them. Referring data to quality assurance program/quality management system in some nuclear installations of IAEA Member States are also presented. (author)

  15. IE Information Notice No. 85-75: Improperly installed instrumentation, inadequate quality control and inadequate postmodification testing

    International Nuclear Information System (INIS)

    Jordan, E.L.

    1992-01-01

    On June 10, 1985, the licensee informed the NRC Resident Inspector that for approximately 5 days LaSalle Unit 2 had been without the capability of automatic actuation of emergency core cooling (ECCS) and that for approximately 3 days during this period the plant had been without secondary containment integrity. The major cause of this condition was improper installation (the variable and reference legs were reversed) of the two reactor vessel level actuation switches which control Division 1 automatic depressurization system (ADS), low pressure core spray (LPCS), and reactor core isolation cooling (RCIC). On July 20, 1985, the Trojan Nuclear Power Plant tripped from 100% power because of a turbine trip that was caused by the loss of the unit auxiliary transformer. All systems functioned normally except that low suction pressure caused one auxiliary feedwater pump to trip and then the other auxiliary feedwater pump to trip after restart of the first auxiliary feedwater pump. The cause of the trips of the auxiliary feedwater pumps can be traced back to improper postmodification adjustment and inadequate postmodification testing following retrofit of environmentally qualified controllers for the auxiliary feedwater system. The auxiliary feedwater pump trips on low suction pressure were caused by excessive combined flow from the two auxiliary feedwater pumps that draw from a single header from the condensate storage tank. The flow control valves were open farther than required after new environmentally qualified controllers had been installed during a recent refueling outage

  16. 47 CFR 59.4 - Definition of “qualifying carrier”.

    Science.gov (United States)

    2010-10-01

    ... (CONTINUED) INFRASTRUCTURE SHARING § 59.4 Definition of “qualifying carrier”. For purposes of this part, the term “qualifying carrier” means a telecommunications carrier that: (a) Lacks economies of scale or...

  17. The technical qualified expert on radiation protection in Spain

    International Nuclear Information System (INIS)

    Marco Arboli, M.; Rodriguez Suarez, M.

    2002-01-01

    Education and training is considered an important tool for promoting safety culture and improving the level of competence of workers. In the different disciplines involved in Radiation Protection (PR), training programmes are being revised to ensure effective protection of individuals. In the European Union framework, the new normative and its adaptation in the Member States, as well as the past actions in each country, make the community to conclude that harmonization of educational programmes and European recognition of the qualification must be reached. An important point of these actions is the definition of the European Qualified Expert. Article 38 of the EURATOM Basic Safety Standards imposes requirements on training and education of the qualified experts and their exchange within the European Union. Since then, there has been many initiatives to seek to harmonization of the qualified expert requirements. In the Spanish education system, there has been a standard training and competent authority recognition of the high level qualified experts on radiation protection since 1986, whose programme is continuously being updating and improving. Taking into account the European actions to define the qualified expert training requirements, it has been designed an educational course for the Technical Qualified Expert on Radiation Protection. This pilot course has being carried out during May, 2002. The results of this project is shown in this paper. (Author)

  18. 26 CFR 1.860F-1 - Qualified liquidations.

    Science.gov (United States)

    2010-04-01

    ... 26 Internal Revenue 9 2010-04-01 2010-04-01 false Qualified liquidations. 1.860F-1 Section 1.860F-1 Internal Revenue INTERNAL REVENUE SERVICE, DEPARTMENT OF THE TREASURY (CONTINUED) INCOME TAX (CONTINUED) INCOME TAXES Real Estate Investment Trusts § 1.860F-1 Qualified liquidations. A plan of...

  19. 49 CFR 604.7 - Qualified human service organizations.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false Qualified human service organizations. 604.7... organizations. (a) A recipient may provide charter service to a qualified human service organization (QHSO) for... disabilities; or (3) With low income. (b) If an organization serving persons described in paragraph (a) of this...

  20. 26 CFR 25.2701-4 - Accumulated qualified payments.

    Science.gov (United States)

    2010-04-01

    ... compound interest from the due date of the payment at a rate not less than the appropriate discount rate is... retained interest conferring a distribution right that was previously valued as a qualified payment right (a “qualified payment interest”), the taxable estate or taxable gifts of the individual holding the...

  1. 26 CFR 48.4041-19 - Exemption for qualified methanol and ethanol fuel.

    Science.gov (United States)

    2010-04-01

    ... 26 Internal Revenue 16 2010-04-01 2010-04-01 true Exemption for qualified methanol and ethanol....4041-19 Exemption for qualified methanol and ethanol fuel. (a) In general. Under section 4041(b)(2... or use of qualified methanol or ethanol fuel. (b) Qualified methanol or ethanol fuel defined. For...

  2. Qualified Health Plan (QHP) Landscape

    Data.gov (United States)

    U.S. Department of Health & Human Services — QHP Landscape Files present basic information about certified Qualified Health Plans and Stand-alone Dental Plans for individuals-families and small businesses...

  3. 40 CFR 73.85 - Administrator review of the reserve program.

    Science.gov (United States)

    2010-07-01

    ... PROGRAMS (CONTINUED) SULFUR DIOXIDE ALLOWANCE SYSTEM Energy Conservation and Renewable Energy Reserve § 73... (ii) Qualified renewable energy generation, allocations of allowances will continue pursuant to § 73... allocated for either qualified energy conservation measures or qualified renewable energy generation, the...

  4. Qualifying codes under software quality assurance: Two examples as guidelines for codes that are existing or under development

    Energy Technology Data Exchange (ETDEWEB)

    Mangold, D.

    1993-05-01

    Software quality assurance is an area of concem for DOE, EPA, and other agencies due to the poor quality of software and its documentation they have received in the past. This report briefly summarizes the software development concepts and terminology increasingly employed by these agencies and provides a workable approach to scientific programming under the new requirements. Following this is a practical description of how to qualify a simulation code, based on a software QA plan that has been reviewed and officially accepted by DOE/OCRWM. Two codes have recently been baselined and qualified, so that they can be officially used for QA Level 1 work under the DOE/OCRWM QA requirements. One of them was baselined and qualified within one week. The first of the codes was the multi-phase multi-component flow code TOUGH version 1, an already existing code, and the other was a geochemistry transport code STATEQ that was under development The way to accomplish qualification for both types of codes is summarized in an easy-to-follow step-by step fashion to illustrate how to baseline and qualify such codes through a relatively painless procedure.

  5. Qualifying codes under software quality assurance: Two examples as guidelines for codes that are existing or under development

    International Nuclear Information System (INIS)

    Mangold, D.

    1993-05-01

    Software quality assurance is an area of concern for DOE, EPA, and other agencies due to the poor quality of software and its documentation they have received in the past. This report briefly summarizes the software development concepts and terminology increasingly employed by these agencies and provides a workable approach to scientific programming under the new requirements. Following this is a practical description of how to qualify a simulation code, based on a software QA plan that has been reviewed and officially accepted by DOE/OCRWM. Two codes have recently been baselined and qualified, so that they can be officially used for QA Level 1 work under the DOE/OCRWM QA requirements. One of them was baselined and qualified within one week. The first of the codes was the multi-phase multi-component flow code TOUGH version 1, an already existing code, and the other was a geochemistry transport code STATEQ that was under development The way to accomplish qualification for both types of codes is summarized in an easy-to-follow step-by step fashion to illustrate how to baseline and qualify such codes through a relatively painless procedure

  6. Environmental qualification program of electric equipment for Angra 1

    Energy Technology Data Exchange (ETDEWEB)

    Muzitano, Grazielle F.; Justino, Marcelo C.; Silva, Marcos C., E-mail: grazi@eletronuclear.gov.br, E-mail: justino@eletronuclear.gov.br, E-mail: candeia@eletronuclear.gov.br [Eletrobras Termonuclear S.A. (ELETRONUCLEAR), Rio de Janeiro, RJ (Brazil)

    2017-11-01

    This paper describes the development of the environmental qualification program for important electrical equipment (EQPEE) used for safety in Angra 1 Nuclear Power Plant (NPP). The environmental qualification program started in United States of America by the Nuclear Regulatory Commission (NRC) after the Three Mile Island (TMI) Nuclear Power Plant Accident in 1979. In that event, some equipment installed inside the reactor containment of TMI failed due the harsh conditions that occurred after the accident. Because of this fact, the NRC issued the Regulation 50.49 'Environmental qualification of electric equipment important to safety for nuclear power plants'. The Brazilian regulatory commission CNEN also asked Angra 1 to follow this regulation and to implement an EQPEE similar to the programs adopted by American and other NPPs around the world. Due to the importance to maintain the critical equipment operating in normal and abnormal environment conditions, the program aims to assure that this equipment remains qualified to work under the harsh conditions found inside the reactor containment. The aging of these components are also analyzed in this program that is important in the process to extend the operating life of Angra 1 for more 20 years, which is normally referred as Long Term Operation (LTO). (author)

  7. Environmental qualification program of electric equipment for Angra 1

    International Nuclear Information System (INIS)

    Muzitano, Grazielle F.; Justino, Marcelo C.; Silva, Marcos C.

    2017-01-01

    This paper describes the development of the environmental qualification program for important electrical equipment (EQPEE) used for safety in Angra 1 Nuclear Power Plant (NPP). The environmental qualification program started in United States of America by the Nuclear Regulatory Commission (NRC) after the Three Mile Island (TMI) Nuclear Power Plant Accident in 1979. In that event, some equipment installed inside the reactor containment of TMI failed due the harsh conditions that occurred after the accident. Because of this fact, the NRC issued the Regulation 50.49 'Environmental qualification of electric equipment important to safety for nuclear power plants'. The Brazilian regulatory commission CNEN also asked Angra 1 to follow this regulation and to implement an EQPEE similar to the programs adopted by American and other NPPs around the world. Due to the importance to maintain the critical equipment operating in normal and abnormal environment conditions, the program aims to assure that this equipment remains qualified to work under the harsh conditions found inside the reactor containment. The aging of these components are also analyzed in this program that is important in the process to extend the operating life of Angra 1 for more 20 years, which is normally referred as Long Term Operation (LTO). (author)

  8. The Netherlands: Quality of work and employment of low-qualified workers

    NARCIS (Netherlands)

    Gouw, P.

    2013-01-01

    Based on the Netherlands Working Condition Survey (NEA, TNO) and the available literature, it seems that low-qualified workers experience more labour market problems than middle- or high-qualified workers. The trend in the 2000-2007 period is that the relative number of low qualified workers has

  9. The UK system of recognising qualified experts

    International Nuclear Information System (INIS)

    Bines, W.

    2002-01-01

    EURATOM Basic Safety Standards (BSS) Directives have long included requirements for the involvement of qualified experts, the definition of which has scarcely changed since at least 1976. The Directive requirement, in the definition of qualified expert,, for competent authorities to recognise the capacity to act as a qualified expert has been interpreted by Member States in widely differing ways, ranging from the minimalist or case by case to the highly detailed and prescriptive. In the United Kingdom (UK), the qualified expert for occupational radiation protection is the radiation protection adviser and the competent authority is the Health and Safety Executive (HSE). The Ionising Radiations Regulations 1985, which largely implemented the 1980 BSS Directive, required an employer to appoint one or more radiation protection advisers for the purpose of advising him as to the observance of these Regulations and other health and safety matters in connection with ionising radiation. The Regulations addressed the question of recognition by forbidding an employer to appoint a person as a radiation protection adviser unless: that person was suitably qualified and experienced; the employer had notified the Health and Safety Executive in writing of the intended appointment at least 28 days in advance, giving the name of the person and particulars of his qualifications and experience and the scope of the advice he would be required to give; and the employer had received from HSE an acknowledgement in writing of the notification. This system allowed HSE to follow up and query any apparently unsuitable potential appointments while applying a light overall administrative touch. The Approved Code of Practice supporting the Regulations included advice on the qualifications, experience and qualities that the employer should look for in a suitable radiation protection adviser

  10. 30 CFR 203.43 - To which production do I apply the RSV earned from qualified deep wells or qualified phase 1...

    Science.gov (United States)

    2010-07-01

    ... in water between 200 and 400 meters deep, you begin drilling an original deep well with a perforated... 200 meters deep; (ii) May 18, 2007, for an RSV earned by a qualified deep well on a lease that is located entirely in water more than 200 meters deep; or (iii) The date that the first qualified well that...

  11. 10 CFR 451.4 - What is a qualified renewable energy facility.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 3 2010-01-01 2010-01-01 false What is a qualified renewable energy facility. 451.4 Section 451.4 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION RENEWABLE ENERGY PRODUCTION INCENTIVES § 451.4 What is a qualified renewable energy facility. In order to qualify for an incentive payment under...

  12. Piezometer installation and monitoring procedure: Revision 1

    International Nuclear Information System (INIS)

    1987-04-01

    The Deaf Smith County (Texas) site has been selected by the US Department of Energy as one of three candidate sites for characterization to determine its suitability as a geologic repository for high-level nuclear waste. The installation and monitoring of piezometers has been identified as one of the tasks required during the development of an underground Exploratory Shaft Facility to satisfy specific information needs through a program of in situ testing, instrumentation and monitoring. The scope of piezometer installation and monitoring encompasses the installation of fluid pressure measuring equipment and the subsequent collection, presentation and interpretation of piezometric data from strata surrounding the Exploratory Shaft Facility (ESF) prior to, during and following construction of the ESF, and as part of geohydrologic testing within the ESF. This procedure describes the required instrumentation, equipment, and sequence of activities for piezometer installation in the ESF. The procedure also includes details on the data recording and presentation requirements, personnel responsibilities, test management and quality assurance. 16 refs., 12 figs., 2 tabs

  13. Air Force Officer Qualifying Test Form T: Initial Item-, Test-, Factor-, and Composite-Level Analyses

    Science.gov (United States)

    2016-12-01

    used to qualify applicants for ROTC and OTS officer commissioning programs. The Pilot, Combat Systems Officer (CSO), and Air Battle Manager ( ABM ...AIR FORCE RESEARCH LABORATORY 711 HUMAN PERFORMANCE WING, AIRMAN SYSTEMS DIRECTORATE, WRIGHT-PATTERSON AIR FORCE BASE, OH 45433 AIR FORCE MATERIEL...Warfighter Interface Division Airman Systems Directorate This report is published in the interest of scientific and technical information exchange, and

  14. Installation tests for BERSAFE 88

    International Nuclear Information System (INIS)

    Bamfield, R.D.; Haigh, R.

    1989-02-01

    A set of ten test problems for each of the four BERSAFE stress analysis programs is provided. These problems along with this report, which forms part of the BERSAFE 88 documentation, constitute a test of the customers' BERSAFE installation. On running the problems and attaining results identical to those presented here, the customer should have some confidence that his system is operating correctly. (author)

  15. Confidence in leadership among the newly qualified.

    Science.gov (United States)

    Bayliss-Pratt, Lisa; Morley, Mary; Bagley, Liz; Alderson, Steven

    2013-10-23

    The Francis report highlighted the importance of strong leadership from health professionals but it is unclear how prepared those who are newly qualified feel to take on a leadership role. We aimed to assess the confidence of newly qualified health professionals working in the West Midlands in the different competencies of the NHS Leadership Framework. Most respondents felt confident in their abilities to demonstrate personal qualities and work with others, but less so at managing or improving services or setting direction.

  16. 49 CFR 192.285 - Plastic pipe: Qualifying persons to make joints.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Plastic pipe: Qualifying persons to make joints... Materials Other Than by Welding § 192.285 Plastic pipe: Qualifying persons to make joints. (a) No person may make a plastic pipe joint unless that person has been qualified under the applicable joining procedure...

  17. Installing and Testing a Server Operating System

    Directory of Open Access Journals (Sweden)

    Lorentz JÄNTSCHI

    2003-08-01

    Full Text Available The paper is based on the experience of the author with the FreeBSD server operating system administration on three servers in use under academicdirect.ro domain.The paper describes a set of installation, preparation, and administration aspects of a FreeBSD server.First issue of the paper is the installation procedure of FreeBSD operating system on i386 computer architecture. Discussed problems are boot disks preparation and using, hard disk partitioning and operating system installation using a existent network topology and a internet connection.Second issue is the optimization procedure of operating system, server services installation, and configuration. Discussed problems are kernel and services configuration, system and services optimization.The third issue is about client-server applications. Using operating system utilities calls we present an original application, which allows displaying the system information in a friendly web interface. An original program designed for molecular structure analysis was adapted for systems performance comparisons and it serves for a discussion of Pentium, Pentium II and Pentium III processors computation speed.The last issue of the paper discusses the installation and configuration aspects of dial-in service on a UNIX-based operating system. The discussion includes serial ports, ppp and pppd services configuration, ppp and tun devices using.

  18. NRC Information No. 90-23: Improper installation of Patel conduit seals

    International Nuclear Information System (INIS)

    Rossi, C.E.

    1992-01-01

    On November 6, 1989, the staff at the H.B. Robinson plant notified the NRC that they had discovered that some of the conduit seal grommets used to seal insulated wire conductors entering environmentally qualified instrument housings were oversized for the application. The seals are used to prevent moisture from entering safety-related electrical components following loss-of-coolant accidents. The problem was attributed to inadequate installation instructions that were used when the seals were installed in 1986 and 1987. These instructions listed the grommets by wire gauge size and gave maximum wire insulation diameters for each wire size. In accordance with these instructions, the seals were selected based on wire gauge alone. However, since the insulation thickness for a given wire gauge the correct grommet size would have been the minimum wire insulation diameter for which a particular grommet will achieve an effective seal. The selection of grommet size based only on wire gauge size resulted in the installation of some grommets that were too large to provide an effective seal. As a result, some of the seals failed pressure tests that were designed to simulate post-LOCA pressures. During the investigation of the grommet leakage problem, the Robinson staff also checked the torque on the conduit seal union nuts that are used to compress the seals. EGS Corporation recommends that the union nuts be torqued to 50 ft-lb. On approximately half of the 90 seals inspected, the union nut moved about 1/4 inch when this torque was applied. EGS Corporation reports that 1/4 inch of movement does not necessarily indicate a degraded seal but recommends that the correct torque be verified on a representative sample of installed conduit seals

  19. 20 CFR 404.1018b - Medicare qualified government employment.

    Science.gov (United States)

    2010-04-01

    ... AND DISABILITY INSURANCE (1950- ) Employment, Wages, Self-Employment, and Self-Employment Income Work Excluded from Employment § 404.1018b Medicare qualified government employment. (a) General. The work of a... 20 Employees' Benefits 2 2010-04-01 2010-04-01 false Medicare qualified government employment. 404...

  20. Agricultural biogas. Intermediate assessment - Biogas Mission. The Energivie Program - Projects of development of farm-based methanization. Site selection, Visits of installations, Consultation of installers

    International Nuclear Information System (INIS)

    Maurer, Michel

    2005-06-01

    A first document presents Alsace pilot projects: technical and economic recalls, site pre-selection, project leader, description of the mobilisation of lipid co-substrates (interest of fats, modalities), regulatory context (for biogas production, electric energy supply and digestate use). It also presents installer companies which have been consulted for these projects. Another document proposes technical and economical analyses of proposals made by installers, and an analysis of deadlocking points for these pilot projects. Technical, economic, and environmental elements, as well as those dealing with installation management, costs and construction delays to be provided by the consulted company are indicated and commented

  1. Low-Income Housing Tax Credit (LIHTC) Qualified Census Tract (QCT)

    Data.gov (United States)

    Department of Housing and Urban Development — It allows to generate tables for Low-Income Housing Tax Credit (LIHTC) Qualified Census Tracts (QCT) and for Difficult Development Areas (DDA). LIHTC Qualified...

  2. 7 CFR 1436.13 - Loan installments, delinquency, and acceleration of maturity date.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 10 2010-01-01 2010-01-01 false Loan installments, delinquency, and acceleration of... FACILITY LOAN PROGRAM REGULATIONS § 1436.13 Loan installments, delinquency, and acceleration of maturity... delinquency, CCC may permit a rescheduling of the debt or other measures consistent with the collection of...

  3. Design and installation of a system of quality for the specialized services of irradiation

    International Nuclear Information System (INIS)

    Rodriguez, Y.; Romero, M.; Castillo, E.; Villoch, A.; Cruz, S.

    1999-01-01

    This study is traced as objective the the design and installation of a System of Quality of agreement to the norm ISO 9002 and the NC-ISO/IEC Guide 25. For this a program was elaborated that it embraced the following phases: organization, installation and maintenance of the system. The elements that would conform the whole program of quality of the irradiation services they would be given from the qualification of the material to process until the certification of the dose imparted to the product; as well as the internal and external control of the quality in the own one installation

  4. 49 CFR 192.283 - Plastic pipe: Qualifying joining procedures.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Plastic pipe: Qualifying joining procedures. 192... Materials Other Than by Welding § 192.283 Plastic pipe: Qualifying joining procedures. (a) Heat fusion... for making plastic pipe joints by a heat fusion, solvent cement, or adhesive method, the procedure...

  5. 17 CFR 210.12-09 - Valuation and qualifying accounts.

    Science.gov (United States)

    2010-04-01

    ... period Column C—Additions (1)—Charged to costs and expenses (2)—Charged to other accounts—describe Column... qualifying accounts and reserves by descriptive title. Group (a) those valuation and qualifying accounts... accounts. 210.12-09 Section 210.12-09 Commodity and Securities Exchanges SECURITIES AND EXCHANGE COMMISSION...

  6. Nuclear programs see a qualified increase

    International Nuclear Information System (INIS)

    Anon.

    1995-01-01

    This March 1995 Nuclear News article is a review of the proposed DOE budget for nuclear energy activities. This proposed budget increases spending by 32.7% and includes increases in nearly every individual program except civilian reactor development. Isotope production and distribution receive the largest increase, followed by termination costs for certain federal reactor projects. There is a 61.9% proposed increase (to $199M) for waste management activities, but with funding from other Departments, the actual budget would be $612M. The majority of this money would go toward Yucca Mountain activities. Except for the cancellation of the Advanced Neutron Source, the Science and Technology portion of the budget shows an overall small increase

  7. 46 CFR 391.6 - Tax treatment of qualified withdrawals.

    Science.gov (United States)

    2010-10-01

    ... accounting whereby (1) payments shall reduce the basis of the property on the day such payments are actually... 46 Shipping 8 2010-10-01 2010-10-01 false Tax treatment of qualified withdrawals. 391.6 Section...-469 FEDERAL INCOME TAX ASPECTS OF THE CAPITAL CONSTRUCTION FUND § 391.6 Tax treatment of qualified...

  8. 49 CFR 350.301 - What level of effort must a State maintain to qualify for MCSAP funding?

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 5 2010-10-01 2010-10-01 false What level of effort must a State maintain to... What level of effort must a State maintain to qualify for MCSAP funding? (a) The State must maintain... funds and State matching funds, for CMV safety programs eligible for funding under this part at a level...

  9. Inelastic seismic behavior of post-installed anchors for nuclear safety related structures: Generation of experimental database

    Energy Technology Data Exchange (ETDEWEB)

    Mahadik, Vinay, E-mail: vinay.mahadik@iwb.uni-stuttgart.de; Sharma, Akanshu; Hofmann, Jan

    2016-02-15

    Highlights: • Experiments for evaluating seismic behavior of anchors were performed. • Two undercut anchor products in use in nuclear facilities were considered. • Monotonic tension, shear and cycling tension tests at different crack widths. • Crack cycling tests at constant, in-phase and out-of phase tension loads. • Characteristics for the two anchors as a function of crack width were identified. - Abstract: Post installed (PI) anchors are often employed for connections between concrete structure and components or systems in nuclear power plants (NPP) and related facilities. Standardized practices for nuclear related structures demand stringent criteria, which an anchor has to satisfy in order to qualify for use in NPP related structures. In NPP and related facilities, the structure–component interaction in the event of an earthquake depends on the inelastic behavior of the concrete structure, the component system and also the anchorage system that connects them. For analysis, anchorages are usually assumed to be rigid. Under seismic actions, however, it is known that anchors may undergo significant plastic displacement and strength degradation. Analysis of structure–component interaction under seismic loads calls for numerical models simulating inelastic behavior of anchorage systems. A testing program covering different seismic loading scenarios in a reasonably conservative manner is required to establish a basis for generating numerical models of anchorage systems. Currently there is a general lack of modeling techniques to consider the inelastic behavior of anchorages in structure–component interaction under seismic loads. In this work, in view of establishing a basis for development of numerical models simulating the inelastic behavior of anchors, seismic tests on two different undercut anchors qualified for their use in NPP related structures were carried out. The test program was primarily based on the DIBt-KKW-Leitfaden (2010) guidelines

  10. 47 CFR 76.977 - Minority and educational programming used in lieu of designated commercial leased access capacity.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 4 2010-10-01 2010-10-01 false Minority and educational programming used in... Cable Rate Regulation § 76.977 Minority and educational programming used in lieu of designated... of programming from a qualified minority programming source or from any qualified educational...

  11. 42 CFR 436.128 - Coverage for certain qualified aliens.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 4 2010-10-01 2010-10-01 false Coverage for certain qualified aliens. 436.128... Mandatory Coverage of the Categorically Needy § 436.128 Coverage for certain qualified aliens. The agency... § 440.255(c) of this chapter to those aliens described in § 436.406(c) of this subpart. [55 FR 36820...

  12. 26 CFR 1.1092(c)-1 - Qualified covered calls.

    Science.gov (United States)

    2010-04-01

    ... lowest qualified benchmark is determined using the adjusted applicable stock price, as defined in § 1... (CONTINUED) INCOME TAXES Wash Sales of Stock Or Securities § 1.1092(c)-1 Qualified covered calls. (a) In.... Under section 1092(d)(3)(B)(i)(I), stock is personal property if the stock is part of a straddle that...

  13. 26 CFR 1.405-1 - Qualified bond purchase plans.

    Science.gov (United States)

    2010-04-01

    ... purchase plan must conform to the definition of a pension plan in paragraph (b)(1)(i) of § 1.401-1, or the.... Accordingly, even though a qualified bond purchase plan is designed as a pension plan, it need not provide... apply in a nondiscriminatory manner. (ii) A qualified bond purchase plan which is designed as a pension...

  14. PLAN Bicol, Philippines: health manpower development program in action.

    Science.gov (United States)

    Lind, K

    1994-06-01

    PLAN Bicol in the Philippines is a community based Health Manpower Development Program (HMDP) geared toward training and mobilization of indigenous health practitioners, providing infrastructural and logistical support to individual families, and educating the community about health, nutrition, and the environment. The field officer recommends at the initiation of a project that program staff have roles that are well defined. New programs should be introduced to the community first and should involve the community in the planning stages. The HMDP program is directed to 38 villages located around national parks that have suffered from deforestation. Community health issues are malnutrition, low immunization, and lack of access to health services. HMDP established a training program for auxiliary health workers (AHWs), who make a commitment to return to their villages after training. Midwives are being trained at local schools. Village houses are being built and repaired; water systems and sanitary toilet facilities are being installed. Village health stations have been constructed and equipped with basic medicines, supplies, and equipment, and are open 5 days a week. Health education classes inform the community about nutrition and health. The problems at inception were the unwillingness of field staff to participate in the program and a high drop out rate among AHWs. Problems were worked out as the program progressed. Facilitative factors are the close coordination with the provincial health office, community acceptance, and the availability of qualified people.

  15. Final Environmental Assessment For Proposed Family Campground Expansion Maxwell Air Force Base, Montgomery County, Alabama

    Science.gov (United States)

    2013-03-27

    during Final EA preparation. Providing private address information with your comment is voluntary and such personal information will be kept confidential ...commercially available. 4.2 Commercial kitchen appliances shall be either ENERGY STAR®, FEMP designated or qualified for California Utilities Rebate Program... kitchen pre-rinse spray valves (PRSV) with low flow nozzles) i. Install or convert to only ENERGY STAR® Commercial Dishwashers j. Install or convert to

  16. Installation and validation of MCNP-4A

    International Nuclear Information System (INIS)

    Marks, N.A.

    1997-01-01

    MCNP-4A is a multi-purpose Monte Carlo program suitable for the modelling of neutron, photon, and electron transport problems. It is a particularly useful technique when studying systems containing irregular shapes. MCNP has been developed over the last 25 years by Los Alamos, and is distributed internationally via RSIC at Oak Ridge. This document describes the installation of MCNP-4A (henceforth referred to as MCNP) on the Silicon Graphics workstation (bluey.ansto.gov.au). A limited number of benchmarks pertaining to fast and thermal systems were performed to check the installation and validate the code. The results are compared to deterministic calculations performed using the AUS neutronics code system developed at ANSTO. (author)

  17. Idaho National Engineering Laboratory installation roadmap document

    International Nuclear Information System (INIS)

    1993-01-01

    The roadmapping process was initiated by the US Department of Energy's office of Environmental Restoration and Waste Management (EM) to improve its Five-Year Plan and budget allocation process. Roadmap documents will provide the technical baseline for this planning process and help EM develop more effective strategies and program plans for achieving its long-term goals. This document is a composite of roadmap assumptions and issues developed for the Idaho National Engineering Laboratory (INEL) by US Department of Energy Idaho Field Office and subcontractor personnel. The installation roadmap discusses activities, issues, and installation commitments that affect waste management and environmental restoration activities at the INEL. The High-Level Waste, Land Disposal Restriction, and Environmental Restoration Roadmaps are also included

  18. Installation effects of auger cast-in-place piles

    Directory of Open Access Journals (Sweden)

    Fathi M. Abdrabbo

    2012-12-01

    Full Text Available Since their introduction in Europe and North America some 50 years ago, auger cast-in-place piles (ACIP have become increasingly popular all over the world. These piles offer considerable environmental advantages during construction including minimal vibration, and low noise beside their high productivity. The most severe limitation of the ACIP is its sensitivity to operator performance, which can lead to a pile of poor integrity or inconsistent quality. Thus the improper use of ACIP equipment can result in piles containing defects or can cause instability of nearby structures. Three case studies are presented and discussed in an effort to illustrate learned lessons. First case study highlights the misuse of ACIP equipment leading to unreliable defective pile foundations. Second and third case studies show the adverse effects of installing ACIP on the stability of nearby structures. The study revealed that it is essential to employ a clever pile crew during the installation of ACIP to observe, interpret, and take corrective actions for unusual situations. The authorities worldwide should oblige pile contractors to employ only experienced and qualified workers in charge of geotechnical engineering works. Tender documents should include precise clauses related to the technological factors affecting the quality of ACIP. Unfavorable side effects of installing ACIP in saturated loose and medium sand can cause tilt of adjacent existing structures; even they are on either shallow or deep foundations. A row of micro-piles and/or soil grouting adjacent to the existing buildings were successfully used to reduce the adverse effects of ACIP. Implementation of different codes on the results of pile loading tests produced different pile working loads. Therefore tender documents should specify the code upon which interpreting the pile test results. At the meantime the geotechnical engineer should implement his experience and judgment during application of the

  19. Status of environmental response efforts at radioactively contaminated sites in the united states air force installation restoration program

    International Nuclear Information System (INIS)

    Rowe, W.D. Jr.; McEntee, T.E. Jr.; Johnson, B.; Manning, L.

    1995-01-01

    The United States Air Force has identified approximately 170 radioactively contaminated sites at its domestic installations. These sites contain a variety of low level radioactive and mixed wastes and are classified as burial sites, landfills, buildings, and other disposal sites. Of these 170, approximately 70 are presently being evaluated under the Air Force Installation Restoration Program (IRP) in accordance with applicable laws and regulations. Removal and/or remedial actions have been taken at specific sites using site-specific residual radioactivity criteria. The remaining sites are either under investigation to determine the need for possible action or have been classified as response complete based on restricted or unrestricted future use. This paper describes past Air Force operations that generated radioactive waste materials; examines the current inventory of resulting radioactively contaminated sites in the Air Force IRP; reviews criteria used to evaluate sites for removal and/or remedial actions; provides summary information on actions taken at sites; and focuses on response actions and cleanup levels at two completed sites. The paper concludes with an assessment of outstanding issues relevant to the remediation of radioactively contaminated sites. (author)

  20. Installation report - Lidar

    DEFF Research Database (Denmark)

    Georgieva Yankova, Ginka; Villanueva, Héctor

    The report describes the installation, configuration and data transfer for the ground-based lidar. The unit is provided by a customer but is installed and operated by DTU while in this project.......The report describes the installation, configuration and data transfer for the ground-based lidar. The unit is provided by a customer but is installed and operated by DTU while in this project....

  1. The practical skills of newly qualified nurses.

    Science.gov (United States)

    Danbjørg, Dorthe Boe; Birkelund, Regner

    2011-02-01

    This paper reports the findings from a study of newly qualified nurses and which subjects the nurses regarded as the most important in order to be able to live up to the requirements of clinical practice, and how they experience their potential for developing practical and moral skills, after the decrease in practical training. A qualitative approach guided the research process and the analysis of the data. The data was collected by participant observation and qualitative interviews with four nurses as informants. The conclusions made in this study are based on the statements and the observations of the newly qualified nurses. Our findings are discussed in relation to the Aristotelian concept and other relevant literature. The main message is that the newly qualified nurses did not feel equipped when they finished their training. This could be interpreted as a direct consequence of the decrease in practical training. Our study also underlines that the way nursing theory is perceived and taught is problematic. The interviews revealed that the nurses think that nursing theories should be applied directly in practice. This misunderstanding is probably also applicable to the teachers of the theories. Copyright © 2010 Elsevier Ltd. All rights reserved.

  2. Results from Consultancy Meeting on Qualified Technical Centres

    International Nuclear Information System (INIS)

    Novakovic, Mladen

    2017-01-01

    Qualified Technical Centres (QTC) - Current Situation: •Many Member States (MS) need help dealing with DSRS; •Most seek assistance, which can include funding, through the IAEA; •Technical assistance is provided by various governmental organization and private companies (service providers = SP). QTC - Method of Delivery Numerous MS requests are pressing the IAEA’s capacity to assist: •Use qualified internal and external experts/contractors; •Limited pool for DSRS and need to expand; •Dedicated and specialized equipment; •Mobile hot cell; •Mobile tool kit; •Field operations; •Coordinated approach with Nuclear Security and Safety. Qualified Technical Centres for the Management of DSRS: •The challenge is to scale up the support for safe and secure management of DSRS; •Strengthen existing capacity of some MS to support others and make support more sustainable; •Expands the support that can be readily provided and meet the many needs of MS

  3. IEEE Std 649-1980: IEEE standard for qualifying Class 1E motor control centers for nuclear power generating stations

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    This standard describes the basic principles, requirements, and methods for qualifying Class 1E motor control centers for outside containment applications in nuclear power generating stations. Qualification of motor control centers located inside containment in a nuclear power generating station is beyond the scope of this standard. The purpose of this standard is (1) to define specific qualification requirements for Class 1E motor control centers in accordance with the more general qualification requirements of IEEE Std 323-1974, IEE Standard for Qualifying Class 1E Equipment for Nuclear Power Generating Stations; (2) to provide guidance in establishing a qualification program for demonstrating the design adequacy of Class 1E motor control centers in nuclear power generating station applications

  4. 48 CFR 225.872-7 - Industrial security for qualifying countries.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Industrial security for... Agreements and Coordination 225.872-7 Industrial security for qualifying countries. The required procedures... qualifying country sources are in the DoD Industrial Security Regulation DoD 5220.22-R (implemented for the...

  5. Preliminary assessment report for Army Aviation Support Facility No. 3, Installation 13307, Hunter Army Airfield, Savannah, Georgia. Installation Restoration Program

    Energy Technology Data Exchange (ETDEWEB)

    Kolpa, R.; Smith, K.

    1993-07-01

    This report presents the results of the preliminary assessment (PA) conducted by Argonne National Laboratory at the Georgia Army National Guard property located on Hunter Army Airfield (HAA) near Savannah, Georgia, known as Army Aviation Support Facility (AASF) No. 3. Preliminary assessments of federal facilities are being conducted to compile the information necessary for completing preremedial activities and to provide a basis for establishing corrective actions in response to releases of hazardous substances. The principal objective of the PA is to characterize the site accurately and determine the need for further action by examining site activities, types and quantities of hazardous substances utilized, the nature and amounts of wastes generated or stored at the facility, and potential pathways by which contamination could affect public health and the environment. This PA satisfies, for the AASF No. 3 property, requirements of the Department of Defense Installation Restoration Program (IRP). The scope of this assessment is limited to the facilities and past activities contained within the area now occupied by AASF No. 3. However, this assessment report is intended to be read in conjunction with a previous IRP assessment of HAA completed in 1992 (USATHAMA 1992) and to provide comprehensive information on AASF No. 3 for incorporation with information contained in that previous assessment for the entirety of HAA.

  6. The Learning Intentions of Low-Qualified Employees: A Multilevel Approach

    Science.gov (United States)

    Kyndt, Eva; Dochy, Filip; Onghena, Patrick; Baert, Herman

    2013-01-01

    In the continuously changing society and knowledge-intensive economy, the demand for the recurrent updating of competencies is coming to the fore for all employees, including low-qualified employees. Employees are considered low qualified when they do not have a starter qualification for higher education. Although many educational studies have…

  7. 29 CFR 779.386 - Restaurants may qualify as exempt 13(a)(2) establishments.

    Science.gov (United States)

    2010-07-01

    ... 29 Labor 3 2010-07-01 2010-07-01 false Restaurants may qualify as exempt 13(a)(2) establishments... Service Establishments Restaurants and Establishments Providing Food and Beverage Service § 779.386 Restaurants may qualify as exempt 13(a)(2) establishments. (a) A restaurant may qualify as an exempt retail or...

  8. 33 CFR 402.5 - New Business Incentive Program

    Science.gov (United States)

    2010-07-01

    ... Business. (c) A commodity/origin/destination combination that qualifies as New Business after the 30th day... navigation seasons; and (d) A commodity/origin/destination combination that qualifies as New Business after... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false New Business Incentive Program...

  9. Installation of the Light-Water Breeder Reactor at the Shippingport Atomic Power Station (LWBR Development Program)

    International Nuclear Information System (INIS)

    Massimino, R.J.; Williams, D.A.

    1983-05-01

    This report summarizes the refueling operations performed to install a Light Water Breeder Reactor (LWBR) core into the existing pressurized water reactor vessel at the Shippingport Atomic Power Station. Detailed descriptions of the major installation operations (e.g., primary system preconditioning, fuel installation, pressure boundary seal welding) are included as appendices to this report; these operations are of technical interest to any reactor servicing operation, whether the reactor is a breeder or a conventional light water non-breeder core

  10. Installation of the Light-Water Breeder Reactor at the Shippingport Atomic Power Station (LWBR Development Program)

    Energy Technology Data Exchange (ETDEWEB)

    Massimino, R.J.; Williams, D.A.

    1983-05-01

    This report summarizes the refueling operations performed to install a Light Water Breeder Reactor (LWBR) core into the existing pressurized water reactor vessel at the Shippingport Atomic Power Station. Detailed descriptions of the major installation operations (e.g., primary system preconditioning, fuel installation, pressure boundary seal welding) are included as appendices to this report; these operations are of technical interest to any reactor servicing operation, whether the reactor is a breeder or a conventional light water non-breeder core.

  11. LHC installation planning

    CERN Document Server

    Weisz, S

    2005-01-01

    installation of the general services, the installation of the cryogenic line (QRL), the installation of the machine elements and the hardware commissioning. While the installation of the general services is now almost finished (see presentation by Katy Foraz and Serge Grillot), several problems and delays with the QRL made it unavoidable to revise the installation strategy and to schedule a number tasks in parallel. A new compressed installation planning has been issued, that fulfils the strategic objectives and allows starting new activities with minimal delays in sectors 7-8 and 8-1. However, the shortcuts that are introduced increase the level of risk that we will have to face and the coordination of such a large and complex variety of simultaneous activities makes the project even more challenging. The document will describe how the input from the different equipment groups is taken into account by the master schedule planning team with respect to equipment availability and production as well as logistics...

  12. Implementation of a Quality Assurance Program in a new Radiotherapy Center taking as base the TG-40

    International Nuclear Information System (INIS)

    Marles, A.; Besa, P.; Hecht, P.; Arriagada, L.; Ruz, A.; Garay, C.

    1998-01-01

    The recommended principles in the 'Comprehensive QA for radiation oncology: Report of AAPM Radiation Therapy Committee Task Group 40', TG-40, have been the base for implementation of the Quality Assurance Program of a modern Radiotherapy service. During its application has been necessary: to initiate its implementation before the equipment installation, assuming the costs of the contracts of the qualified personnel, realizing an initial investment adequate for equipment acquisition necessary for acceptation, commissioning and routinary control, the experienced formation of the personnel in the protocol philosophy, establishing procedures for day by day process which would allow the retrofeeding, the elaboration of templates and opening to changes and adjustments according to the necessities. The experience of two years had been demonstrated that the TG-40: a) It is feasible to be implemented but sometimes no strict totally and it is essential to have qualified personnel and the necessary material resources; b) It does not contains all the necessary for its practical implementation and must be completing with procedures and routine formats which facilitate their application; c) It allows the detection and opportune failure correction in the process; d) It is a continuous process that does not finishes. (Author)

  13. Broad Overview of Energy Efficiency and Renewable Energy Opportunities for Department of Defense Installations

    Energy Technology Data Exchange (ETDEWEB)

    Anderson, E.; Antkowiak, M.; Butt, R.; Davis, J.; Dean, J.; Hillesheim, M.; Hotchkiss, E.; Hunsberger, R.; Kandt, A.; Lund, J.; Massey, K.; Robichaud, R.; Stafford, B.; Visser, C.

    2011-08-01

    The Strategic Environmental Research and Developmental Program (SERDP)/Environmental Security Technology Certification Program (ESTCP) is the Department of Defense?s (DOD) environmental science and technology program focusing on issues related to environment and energy for the military services. The SERDP/ESTCP Office requested that the National Renewable Energy Laboratory (NREL) provide technical assistance with strategic planning by evaluating the potential for several types of renewable energy technologies at DOD installations. NREL was tasked to provide technical expertise and strategic advice for the feasibility of geothermal resources, waste-to-energy technology, photovoltaics (PV), wind, microgrids, and building system technologies on military installations. This technical report is the deliverable for these tasks.

  14. Second session: operating European facilities and their programs; Session 2: Les installations Europeennes actuelles et leurs programmes

    Energy Technology Data Exchange (ETDEWEB)

    Iracane, D. [CEA Saclay, Dir. de l' Energie Nucleaire (DEN), 91 - Gif sur Yvette (France); Porracchia, A.; Fougeras, P.; Morey, J.M. [CEA Cadarache, 13 - Saint-Paul-lez-Durance (France). Dept. d' Etudes des Reacteurs; Loubiere, S.; Durande-Ayme, P. [CEA Saclay, Nuclear Energy Div., Reactors and Nuclear Services Deptment, 91 - Gif-sur-Yvette (France); Guidez, J.; Goux, D. [CEA Valrho, Dir. de l' Energie Nucleaire, DEN, 30 - Marcoule (France); Dupraz, R.; Brand, B. [FRAMATOME, AREVA-FANP, 69 - Lyon (France); Blanc, J.Y. [CEA Saclay, 91 - Gif sur Yvette (France); Perthuis, S. de [FRAMATOME ANP, 92 - Paris-La-Defence (France); Le Rouzic, J.F. [Electricite de France (EDF), 92 - Clamart (France)

    2005-07-01

    Most European nuclear post-irradiation examination facilities are ageing and the optimization of the remaining infrastructures may lead to connect them through a network implying consistent staff competence between countries and efficient nuclear material transport means. The second article describes the 3 very-low power research reactors operating in France: Minerve, Masurca and Eole. The Osiris reactor is presented in the third article, the author focuses on the devices available in Osiris to perform irradiation in light water reactor conditions and in high temperature reactor conditions and on the associated programs. Phenix reactor located on the Marcoule site had been performing from 1974 to 1990 the necessary technological qualifications required by the fast reactor system. An important upgrading program, led from 1994 to 2003, has allowed the reactor to begin a second life. Its investigation program encompasses research work on the transmutation of actinides and fission products and on new nuclear fuels and materials required for the future fourth generation of reactors. In Europe about 20 hot laboratories offer services to perform examination and qualification required by their national civil nuclear programs. Most are state-owned and show a large range of activities: nuclear fuels, materials, reprocessing, radio-nuclides, and radio-active sources. The last article reviews the main test loops operating in France and in neighboring countries. About 30 installations are reported and classified according to their activity fields : critical heat flux, hydro-mechanics, device testing, accidental situations, helium and severe reactor accidents. (A.C.)

  15. Predictive maintenance systems in continuous mine transport installations. Case study from Puentes mine. Sistemas de mantenimiento predictivo en instalaciones mineras de transporte continuo. Casa mina de Puentes

    Energy Technology Data Exchange (ETDEWEB)

    Arechaga Rodriguez, F; Roda Vazquez, C [ENDESA, Madrid (Spain)

    1988-01-01

    At some complex mining installations it is necessary to complement the corrective and preventive maintenance with new systems that enable the detection of failures before they become evident and cause a breakdown. These systems, called predictive maintenance, use several techniques, such as: vibration control, lubricant analysis, wear control, etc. This kind of maintenance provides good results, and although it is not expensive, it requires qualified personnel and good organisation.

  16. Qualified-agent virtue ethics | van Zyl | South African Journal of ...

    African Journals Online (AJOL)

    Qualified-agent virtue ethics provides an account of right action in terms of the virtuous agent. It has become one of the most popular, but also most frequently criticized versions of virtue ethics. Many of the objections rest on the mistaken assumption that proponents of qualified-agent virtue ethics share the same view when it ...

  17. Independent Spent Fuel Storage Installations (ISFSI). Annual report, FY 1978

    International Nuclear Information System (INIS)

    Zima, G.E.

    1979-03-01

    The prime objective of the subject program is the identification of technical aspects of the design, operation and maintenance of independent spent fuel storage installations which could contribute to technical bases for Regulations and Regulatory Guides issued by NRC for these facilities. Activities on the various tasks of the program for the FY 1978 period are discussed in this report

  18. The Upgraded Plasma Focus Installation > - The Installation >

    International Nuclear Information System (INIS)

    Krokhin, O.N.; Nikulin, V.Ya.; Babenko, B.A.; Gorbunov, D.N.; Gurei, A.E.; Kalachev, N.V.; Kozlova, T.A.; Malafeev, Yu.S.; Polukhin, S.N.; Sychev, A.A.; Tikhomirov, A.A.; Tsybenko, S.P.; Volobuev, I.V.

    1999-01-01

    The paper presents the upgraded plasma focus installation > - the installation > and some preliminary experimental results. The total energy stored in capacity bank is now 400 kJ, current - 5 MA with the rise time 3.5 μs. The investigation is targeted on the study of near electrode processes and its influence on plasma dynamics in a special operating regime of Filippov type PF - Hard X-ray regime. (author)

  19. Qualifying concrete for a low-level waste repository

    International Nuclear Information System (INIS)

    Philipose, K.E.

    1990-06-01

    A waste repository for the belowground disposal of low-level radioactive waste, labelled IRUS (Intrusion Resistant Underground Structure), is planned at Chalk River Nuclear Laboratories. It relies greatly on the durability of concrete for a minimum of 500 years of service life. A research program based on laboratory testing to design a durable concrete and predict its useful engineered service life is in progress. Durability of concrete depends on its resistance of deterioration from both internal and external causes. Since the rate of degradation depends to a major extent on the rate of ingress of aggressive ions into concrete, laboratory testing is in progress to establish the diffusion rates of ions, especially chlorides, sulphate and carbonate ions. A total of 1000 concrete specimens and 500 paste specimens are being exposed at 22 and 45 degrees C to twenty-five different combinations of corrosive agents, including CO 2 . Procedures to measure the ionic profile and to determine the factors controlling diffusion of ions in the various concretes have been developed. The paper presents the initial results from the research program and the longevity predictions to qualify concretes for the IRUS waste repository, based on twelve months of diffusion testing on laboratory specimens

  20. 46 CFR 11.205 - Requirements for original officer endorsements and STCW endorsements.

    Science.gov (United States)

    2010-10-01

    ... United States by birth. (3) Experience and service acquired on foreign vessels is creditable for... endorsement as offshore installation manager, barge supervisor, or ballast control operator, at least one...) Where an applicant qualifies for an endorsement through an approved training school or program, one of...

  1. Groundwater quality monitoring well installation for Waste Area Grouping 5 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    Mortimore, J.A.; Ebers, M.L.

    1994-09-01

    This report documents the drilling and installation of 22 groundwater quality monitoring (GQM) wells on the perimeter of Waste Area Grouping (WAG) 5. WAG 5 is located south of the Oak Ridge National Laboratory main plant area in Melton Valley and includes 33 solid waste management units. The wells at WAG 5 were drilled and developed between July 1987 and March 1990. These wells were installed to characterize and assess the WAG in accordance with applicable Department of Energy, state, and Environmental Protection Agency regulatory requirements. The purpose of the well installation program was to install GQM wells for groundwater characterization at WAG 5. Data packages produced during installation activities by the ERCE hydrogeologists are an important product of the program. These packages document the well drilling, installation, and development activities and provide valuable data for well sampling and WAG characterization. The forms contained in the packages include predrilling and postdrilling checklists, drilling and construction logs, development and hydraulic conductivity records, and quality control-related documents

  2. 14 CFR 1214.1104 - Evaluation and ranking of highly qualified candidates.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false Evaluation and ranking of highly qualified candidates. 1214.1104 Section 1214.1104 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION... ranking of highly qualified candidates. (a) A selection board consisting of discipline experts, and such...

  3. 8 CFR 214.14 - Alien victims of certain qualifying criminal activity.

    Science.gov (United States)

    2010-01-01

    ... 8 Aliens and Nationality 1 2010-01-01 2010-01-01 false Alien victims of certain qualifying criminal activity. 214.14 Section 214.14 Aliens and Nationality DEPARTMENT OF HOMELAND SECURITY IMMIGRATION REGULATIONS NONIMMIGRANT CLASSES § 214.14 Alien victims of certain qualifying criminal activity. (a...

  4. Solar lease grant program. Technical progress report

    Energy Technology Data Exchange (ETDEWEB)

    1981-04-01

    Progress on a lease program for the installation of a solar water heater with no installation charge is reported. Information on the announcement of the program, the selection of participants, the contractural agreement, progress on installation of equipment, monitoring, and evaluation is summarized. The status of the budget concerned with the program is announced. Forms used for applications for the program and an announcement from Resource Alternatives for Cilco customers are presented.

  5. Lightning Imaging Sensor (LIS) on the International Space Station (ISS): Launch, Installation, Activation, and First Results

    Science.gov (United States)

    Blakeslee, R. J.; Christian, H. J., Jr.; Mach, D. M.; Buechler, D. E.; Koshak, W. J.; Walker, T. D.; Bateman, M. G.; Stewart, M. F.; O'Brien, S.; Wilson, T. O.; Pavelitz, S. D.; Coker, C.

    2016-12-01

    Over the past 20 years, the NASA Marshall Space Flight Center, the University of Alabama in Huntsville, and their partners developed and demonstrated the effectiveness and value of space-based lightning observations as a remote sensing tool for Earth science research and applications, and, in the process, established a robust global lightning climatology. The observations included measurements from the Lightning Imaging Sensor (LIS) on the Tropical Rainfall Measuring Mission (TRMM) and its Optical Transient Detector (OTD) predecessor that acquired global observations of total lightning (i.e., intracloud and cloud-to-ground discharges) spanning a period from May 1995 through April 2015. As an exciting follow-on to these prior missions, a space-qualified LIS built as a flight-spare for TRMM will be delivered to the International Space Station (ISS) for a 2 year or longer mission, flown as a hosted payload on the Department of Defense (DoD) Space Test Program-Houston 5 (STP-H5) mission. The STP-H5 payload containing LIS is scheduled launch from NASA's Kennedy Space Center to the ISS in November 2016, aboard the SpaceX Cargo Resupply Services-10 (SpaceX-10) mission, installed in the unpressurized "trunk" of the Dragon spacecraft. After the Dragon is berth to ISS Node 2, the payload will be removed from the trunk and robotically installed in a nadir-viewing location on the external truss of the ISS. Following installation on the ISS, the LIS Operations Team will work with the STP-H5 and ISS Operations Teams to power-on LIS and begin instrument checkout and commissioning. Following successful activation, LIS orbital operations will commence, managed from the newly established LIS Payload Operations Control Center (POCC) located at the National Space Science Technology Center (NSSTC) in Huntsville, AL. The well-established and robust processing, archival, and distribution infrastructure used for TRMM was easily adapted to the ISS mission, assuring that lightning

  6. Process computers automate CERN power supply installations

    CERN Document Server

    Ullrich, H

    1974-01-01

    Computerized automation systems are being used at CERN, Geneva, to improve the capacity, operational reliability and flexibility of the power supply installations for main ring magnets in the experimental zones of particle accelerators. A detailed account of the technological problem involved is followed in the article by a description of the system configuration, the program system and field experience already gathered in similar schemes. (1 refs).

  7. 13 CFR 108.110 - Qualified management.

    Science.gov (United States)

    2010-01-01

    ... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Qualified management. 108.110... management. An Applicant must show, to the satisfaction of SBA, that its current or proposed management team... or proposed management team has sufficient qualifications, SBA will consider information provided by...

  8. Factor Structure of the Air Force Officer Qualifying Test: Analysis and Comparison

    National Research Council Canada - National Science Library

    Carreta, Thomas

    1998-01-01

    The Air Force Officer Qualifying Test (AFOQT) is used to qualify men and women for commissions in the Air Force, classify them for pilot and navigator jobs, and award Reserve Officer Training Corps (ROTC) scholarships...

  9. Relevant aspects in licensing of radioactive installations at petroleum and gas well logging

    International Nuclear Information System (INIS)

    Miranda, Marcia Valeria da E. Sa

    2002-01-01

    The importance of the various factors considered during the process of licensing of radioactive installation for petroleum and gas well logging. This process involves the issuing of some public power acts, the co called Administrative Acts. For the radioactive installations the Administrative Acts are related to the Norm CNEN-NE-6.02 'Licensing of Radioactive Installation'. In the conduction of the licensing of radioactive installation of mobile nuclear measurement devices the safety evaluation of radioactive installation and equipment containing incorporated radiation source are included; certification of radioprotection supervisors; programing and evaluation of the radioprotection inspections; and the conduction of conformal inspection according to the project, safety analysis and audits. An evaluation of the impact of the importance grade attributed to each factor in the optimization of licensing process is related. Finally, the prediction of implantation of a control system for the displacement of radioactive sources in the installation is approached comprehending the up-to-date localization of each source at different work front of the Basis

  10. Information Support of Highly-Qualified Archers’ Training

    Directory of Open Access Journals (Sweden)

    А. П. Власов

    2017-03-01

    Full Text Available The objective is to ground the ways of improving the level of technical preparedness of highly-qualified archers by means of video and multimedia technologies. Materials and methods: The research studied motor actions of 25 athletes of the national team of Ukraine in archery when they were performing training exercises indoors (exercising area and outdoors (archery range. Each athlete’s technique of executing shooting exercises was video recorded in sequence from different angles (from above, from behind, from the front, from the left and the right sides depending on the shooting line with a digital video camera Sony DCR-XR150E. The processing of the video materials was done with the Dartfish Connekt software package. Results: The research grounds the need to use video and multimedia technologies in the process of training of highly-qualified archers. Such methods aim at improving the skills of both coaches and athletes by helping them better understand all aspects of the training exercises execution. Multimedia means offer a delayed-in-time opportunity to watch the video recording of the training after its preliminary computer processing. It enables the coach and the athlete to focus on the analysis of the execution of the entire exercise and its elements. The paper provides examples of the use of video technologies in archers’ training practice. Conclusions: Prospects of the use of the state-of-the-art computer technologies in sports training are infinite. Computer software and hardware systems should be available for most coaches. The task of the latter is to learn to use and implement them for the benefit of themselves and athletes. The task of the scientific groups and experts is to find a most convenient way for the coach to use the innovative technologies. The task of the software developer is to model intellectual programs to help the coach effectively analyze and evaluate his archers or team when preparing them for the most

  11. Summer Undergraduate Research Program: Environmental studies

    Energy Technology Data Exchange (ETDEWEB)

    McMillan, J. [ed.

    1994-12-31

    The purpose of the summer undergraduate internship program for research in environmental studies is to provide an opportunity for well-qualified students to undertake an original research project as an apprentice to an active research scientist in basic environmental research. The students are offered research topics at the Medical University in the scientific areas of pharmacology and toxicology, epidemiology and risk assessment, environmental microbiology, and marine sciences. Students are also afforded the opportunity to work with faculty at the University of Charleston, SC, on projects with an environmental theme. Ten well-qualified students from colleges and universities throughout the eastern United States were accepted into the program.

  12. Solar PV Manufacturing Cost Model Group: Installed Solar PV System Prices (Presentation)

    Energy Technology Data Exchange (ETDEWEB)

    Goodrich, A. C.; Woodhouse, M.; James, T.

    2011-02-01

    EERE's Solar Energy Technologies Program is charged with leading the Secretary's SunShot Initiative to reduce the cost of electricity from solar by 75% to be cost competitive with conventional energy sources without subsidy by the end of the decade. As part of this Initiative, the program has funded the National Renewable Energy Laboratory (NREL) to develop module manufacturing and solar PV system installation cost models to ensure that the program's cost reduction targets are carefully aligned with current and near term industry costs. The NREL cost analysis team has leveraged the laboratories' extensive experience in the areas of project finance and deployment, as well as industry partnerships, to develop cost models that mirror the project cost analysis tools used by project managers at leading U.S. installers. The cost models are constructed through a "bottoms-up" assessment of each major cost element, beginning with the system's bill of materials, labor requirements (type and hours) by component, site-specific charges, and soft costs. In addition to the relevant engineering, procurement, and construction costs, the models also consider all relevant costs to an installer, including labor burdens and overhead rates, supply chain costs, and overhead and materials inventory costs, and assume market-specific profits.

  13. Status of radiation protection in diagnostic x ray installations at Meerut and Saharanpur districts

    International Nuclear Information System (INIS)

    Mathur, A.S.; Tewari, A.K.; Dwivedi, S.C.; Garg, R.K.

    1993-01-01

    The present study is the assessment of radiation protection in Meerut and Saharanpur districts representing Western U.P. of diagnostic x-ray installations including C.T. centres. This was done by collecting data on questionnaire and personal inspection of radiological set-ups. We concluded that major part of diagnostic work is looked after by private sector and in comparison to Govt. sector this is 2.4:1. Also , <100mA units which are usually owned by non-qualified persons in private sector are doing this work and naturally with much carelessness as far as radiation protection is concerned. Even at posh clinics the protection and monitoring aspect is much neglected due to various reasons. Apart from a control all clinics need a continuing education on safety aspects. (author)

  14. Newly qualified teachers' visions of science learning and teaching

    Science.gov (United States)

    Roberts, Deborah L.

    2011-12-01

    This study investigated newly qualified teachers' visions of science learning and teaching. The study also documented their preparation in an elementary science methods course. The research questions were: What educational and professional experiences influenced the instructor's visions of science learning and teaching? What visions of science learning and teaching were promoted in the participants' science methods course? What visions of science learning and teaching did these newly qualified teachers bring with them as they graduated from their teacher preparation program? How did these visions compare with those advocated by reform documents? Data sources included participants' assignments, weekly reflections, and multi-media portfolio finals. Semi-structured interviews provided the emic voice of participants, after graduation but before they had begun to teach. These data were interpreted via a combination of qualitative methodologies. Vignettes described class activities. Assertions supported by excerpts from participants' writings emerged from repeated review of their assignments. A case study of a typical participant characterized weekly reflections and final multi-media portfolio. Four strands of science proficiency articulated in a national reform document provided a framework for interpreting activities, assignments, and interview responses. Prior experiences that influenced design of the methods course included an inquiry-based undergraduate physics course, participation in a reform-based teacher preparation program, undergraduate and graduate inquiry-based science teaching methods courses, participation in a teacher research group, continued connection to the university as a beginning teacher, teaching in diverse Title 1 schools, service as the county and state elementary science specialist, participation in the Carnegie Academy for the Scholarship of Teaching and Learning, service on a National Research Council committee, and experience teaching a

  15. The latest electrical installation (I)

    International Nuclear Information System (INIS)

    Won, Jong Su

    1976-04-01

    This book deals with the latest electrical installation. The contents of this book are construction electrical installation, regulations related electrical installation, foundation and principle of wiring, main line feeder, lighting installation, power of wiring, main line feeder, lighting installation, power installation, method to read structure drawing for electrical construct drawing electric lamp wiring diagram, working drawing, material and tools and method of construction of electrical installation on types of wiring construction, metallic conduit, rigid poly-vinyl conduit wiring, bus duct work, cable work and insulation out of metal lathed.

  16. Structural considerations for solar installers : an approach for small, simplified solar installations or retrofits.

    Energy Technology Data Exchange (ETDEWEB)

    Richards, Elizabeth H.; Schindel, Kay (City of Madison, WI); Bosiljevac, Tom; Dwyer, Stephen F.; Lindau, William (Lindau Companies, Inc., Hudson, WI); Harper, Alan (City of Madison, WI)

    2011-12-01

    Structural Considerations for Solar Installers provides a comprehensive outline of structural considerations associated with simplified solar installations and recommends a set of best practices installers can follow when assessing such considerations. Information in the manual comes from engineering and solar experts as well as case studies. The objectives of the manual are to ensure safety and structural durability for rooftop solar installations and to potentially accelerate the permitting process by identifying and remedying structural issues prior to installation. The purpose of this document is to provide tools and guidelines for installers to help ensure that residential photovoltaic (PV) power systems are properly specified and installed with respect to the continuing structural integrity of the building.

  17. 46 CFR 390.9 - Qualified withdrawals.

    Science.gov (United States)

    2010-10-01

    ..., construction or reconstruction its fair market value. The party must obtain the prior written permission of the... appraisal to be the fair market value of the vessel, at the time of the acquisition, or the actual cost...: (i) The acquisition, construction or reconstruction of a qualified agreement vessel; (ii) The...

  18. 26 CFR 1.401-7 - Forfeitures under a qualified pension plan.

    Science.gov (United States)

    2010-04-01

    ... 26 Internal Revenue 5 2010-04-01 2010-04-01 false Forfeitures under a qualified pension plan. 1...) INCOME TAX (CONTINUED) INCOME TAXES Pension, Profit-Sharing, Stock Bonus Plans, Etc. § 1.401-7 Forfeitures under a qualified pension plan. (a) General rules. In the case of a trust forming a part of a...

  19. 26 CFR 1.401(a)-11 - Qualified joint and survivor annuities.

    Science.gov (United States)

    2010-04-01

    ... 26 Internal Revenue 5 2010-04-01 2010-04-01 false Qualified joint and survivor annuities. 1.401(a...)-11 Qualified joint and survivor annuities. (a) General rule—(1) Required provisions. A trust, to...), which is a part of a plan providing for the payment of benefits in any form of a life annuity (as...

  20. Residential Central Air Conditioning and Heat Pump Installation – Workshop Outcomes

    Energy Technology Data Exchange (ETDEWEB)

    Goetzler, William [Navigant Consulting, Burlington, MA (United States); Zogg, Robert [Navigant Consulting, Burlington, MA (United States); Young, Jim [Navigant Consulting, Burlington, MA (United States); Bargach, Youssef [Navigant Consulting, Burlington, MA (United States)

    2016-11-01

    DOE's Building Technologies Office works with researchers and industry partners to develop and deploy technologies that can substantially reduce energy consumption in residential and commercial buildings. This report aims to advance BTO’s energy savings, emissions reduction, and other program goals by identifying research and development (R&D), demonstration and deployment, and other non-regulatory initiatives for improving the design and installation of residential central air conditioners (CAC) and central heat pumps (CHP). Improving the adoption of CAC/CHP design and installation best practices has significant potential to reduce equipment costs, improve indoor air quality and comfort, improve system performance, and most importantly, reduce household energy consumption and costs for heating and cooling by addressing a variety of common installation issues.

  1. Installation Of A Training Center With Nuclear Instruments In The I.N.E.A

    International Nuclear Information System (INIS)

    Camargo B, Ana C.; Periaza C, A.

    1993-01-01

    In the framework of the regional technical cooperation of the countries in development, at present, the IAEA executes some investigation projects such as the program of Regional Arrangements of Technical Cooperation for Latin America and Caribbean (ARCAL), from which the program of nuclear instrumentation ARCAL II is derived and by agreement the INEA should install a reference center in Electronic and Nuclear Instrumentation. To complete this objective it has assigned the development of different sub projects, among which is the installation of a training center for operation, cares and quality control of nuclear instruments of medical applications

  2. Experience of Developing Cloud Service for accounting Sales in installments

    Science.gov (United States)

    Barankov, V. V.; Barankova, I. I.; Mikhailova, U. V.; Kalugina, O. B.

    2018-05-01

    The paper presents the developed and implemented system of accounting sales in installments using tables as a cloud variant of Google services. The main system requirements and the special features of the program implementation such as the multi user data cleaning, the volume and speed of converting the tables, the mechanisms of conditional formatting of cells, the protection of cells and ranges and the data input check are provided. The paper also discusses the functionality of the system of accounting sales in installments, which is implemented by the formulae in the cells, the formulae in the extra options of Google tables and by programming in Google Apps Script, as a cloud variant of Java Script. The safety and security of the customers’ data, as well as staff members’ accountability and responsibility for the input of data in the system, are provided by a number of information security measures

  3. 26 CFR 20.2056A-2 - Requirements for qualified domestic trust.

    Science.gov (United States)

    2010-04-01

    ... 26 Internal Revenue 14 2010-04-01 2010-04-01 false Requirements for qualified domestic trust. 20.2056A-2 Section 20.2056A-2 Internal Revenue INTERNAL REVENUE SERVICE, DEPARTMENT OF THE TREASURY (CONTINUED) ESTATE AND GIFT TAXES ESTATE TAX; ESTATES OF DECEDENTS DYING AFTER AUGUST 16, 1954 Taxable Estate § 20.2056A-2 Requirements for qualified...

  4. 26 CFR 1.1092(c)-3 - Qualifying over-the-counter options.

    Science.gov (United States)

    2010-04-01

    ... 26 Internal Revenue 11 2010-04-01 2010-04-01 true Qualifying over-the-counter options. 1.1092(c)-3...-counter options. (a) In general. Under section 1092(c)(4)(B)(i), an equity option is not a qualified covered call option unless it is traded on a national securities exchange that is registered with the...

  5. 26 CFR 11.401(a)-11 - Qualified joint and survivor annuities.

    Science.gov (United States)

    2010-04-01

    ... 26 Internal Revenue 14 2010-04-01 2010-04-01 false Qualified joint and survivor annuities. 11.401... SECURITY ACT OF 1974 § 11.401(a)-11 Qualified joint and survivor annuities. (a) In general—(1) General rule... annuity (i.e., an annuity requiring survival of the participant or his spouse as a condition for payment...

  6. 26 CFR 1.127-2 - Qualified educational assistance program.

    Science.gov (United States)

    2010-04-01

    ... transportation, or (iii) Education involving sports, games, or hobbies, unless such education involves the business of the employer or is required as part of a degree program. The phrase “sports, games, or hobbies...

  7. Competence of newly qualified registered nurses from a nursing college

    Directory of Open Access Journals (Sweden)

    BG Morolong

    2005-09-01

    Full Text Available The South African education and training system, through its policy of outcomesbased education and training, has made competency a national priority. In compliance to this national requirement of producing competent learners, the South African Nursing Council ( 1999 B require that the beginner professional nurse practitioners and midwives have the necessary knowledge, skills, attitudes and values which will enable them to render efficient professional service. The health care system also demands competent nurse practitioners to ensure quality in health care. In the light of competency being a national priority and a statutory demand, the research question that emerges is, how competent are the newly qualified registered nurses from a specific nursing college in clinical nursing education? A quantitative, non-experimental contextual design was used to evaluate the competence of newly qualified registered nurses from a specific nursing college. The study was conducted in two phases. The first phase dealt with the development of an instrument together with its manual through the conceptualisation process. The second phase focused on the evaluation of the competency of newly qualified nurses using the instrument based on the steps of the nursing process. A pilot study was conducted to test the feasibility of the items of the instrument. During the evaluation phase, a sample of twenty-six newly qualified nurses was selected by simple random sampling from a target population of thirty-six newly qualified registered nurses. However, six participants withdrew from the study. Data was collected in two general hospitals where the newly qualified registered nurses were working. Observation and questioning were used as data collection techniques in accordance with the developed instrument. Measures were taken to ensure internal validity and reliability of the results. To protect the rights of the participants, the researcher adhered to DENOSA’S (1998

  8. Audit of the Reporting Requirements for Major Automated Information System Programs

    National Research Council Canada - National Science Library

    2000-01-01

    .... There are 71 Major Automated Information System programs with total program costs of $26 billion. To qualify as a Major Automated Information System, the program must meet the following critena...

  9. Capping off installation

    CERN Multimedia

    2006-01-01

    Installation of the cathode strip chambers for the muon system on the CMS positive endcap has been completed. Technicians install one of the last muon system cathode strip chambers on the CMS positive endcap. Like successfully putting together the pieces of a giant puzzle, installation of the muon system cathode strip chambers on one of the CMS endcaps has been completed. Total installation of the cathode strip chambers (CSC) is now 91 percent complete; only one ring of chambers needs to be mounted on the remaining endcap to finish installation of the entire system. To guarantee a good fit for the 468 total endcap muon system CSCs, physicists and engineers from the collaboration spent about 10 years carefully planning the design. The endcap muon system's cables, boxes, pipes and other parts were designed and integrated using a 3D computerized model. 'It took a long time to do all the computer modelling, but in the long run it saved us an enormous amount of time because it meant that everything fit together,...

  10. Learning Styles of Pilots Currently Qualified in United States Air Force Aircraft

    Science.gov (United States)

    Kanske, Craig A.

    2001-01-01

    Kolb's Learning Style Inventory was used to identify the predominant learning styles of pilots currently qualified in United States Air Force aircraft. The results indicate that these pilots show a significant preference for facts and things over people and feelings. By understanding the preferred learning styles of the target population, course material can be developed that take advantage of the strengths of these learning styles. This information can be especially useful in the future design of cockpit resource management training. The training program can be developed to demonstrate both that there are different learning styles and that it is possible to take advantage of the relative strengths of each of these learning styles.

  11. IEEE Std 323-1983: IEEE standard for qualifying Class 1E equipment for nuclear power generating stations

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    This standard describes the basic requirements for qualifying Class 1E equipment with interfaces that are to be used in nuclear power generating stations. The requirements presented include the principles, procedures, and methods of qualification. These qualification requirements, when met, will confirm the adequacy of the equipment design under normal, abnormal, design basis event, post design basis event, and in-service test conditions for the performance of safety function(s). The purpose of this standard is to identify requirements for the qualification of Class 1E equipment, including those interfaces whose failure could adversely affect the performance of Class 1E equipment and systems. The methods described shall be used for qualifying equipment, extending qualification, and updating qualification if the equipment is modified. Other issued IEEE standards which present qualification methods for specific equipment or components, or both, and those that deal with parts of the qualification program, may be used to supplement this standard, as applicable

  12. 12 CFR 617.7410 - When and how does a qualified lender notify a borrower of the right to seek loan restructuring?

    Science.gov (United States)

    2010-01-01

    ... borrower of the right to seek loan restructuring? 617.7410 Section 617.7410 Banks and Banking FARM CREDIT... Mediation Programs § 617.7410 When and how does a qualified lender notify a borrower of the right to seek... been identified as distressed and that the borrower has the right to request a restructuring of the...

  13. 41 CFR 102-80.135 - Who is a qualified fire protection engineer?

    Science.gov (United States)

    2010-07-01

    ... protection engineer? 102-80.135 Section 102-80.135 Public Contracts and Property Management Federal Property... qualified fire protection engineer? A qualified fire protection engineer is defined as an individual with a thorough knowledge and understanding of the principles of physics and chemistry governing fire growth...

  14. 26 CFR 1.883-4T - Qualified shareholder stock ownership test (temporary).

    Science.gov (United States)

    2010-04-01

    ... 26 Internal Revenue 9 2010-04-01 2010-04-01 false Qualified shareholder stock ownership test... (CONTINUED) INCOME TAX (CONTINUED) INCOME TAXES Foreign Corporations § 1.883-4T Qualified shareholder stock... the stock; (D) If the individual directly owns an interest in a corporation, partnership, trust...

  15. Solar installer training: Home Builders Institute Job Corps

    Energy Technology Data Exchange (ETDEWEB)

    Hansen, K.; Mann, R. [San Diego Job Corps Center, Imperial Beach, CA (United States). Home Builders Inst.

    1996-10-01

    The instructors describe the solar installation training program operated since 1979 by the Home Builders Institute, the Educational Arm of the National Association of Home Builders for the US Department of Labor, Job Corps in San Diego, CA. The authors are the original instructors and have developed the program since its inception by a co-operative effort between the Solar Energy Industries Association, NAHB and US DOL. Case studies of a few of the 605 students who have gone to work over the years after the training are included. It is one of the most successful programs under the elaborate Student Performance Monitoring Information System used by all Job Corps programs. Job Corps is a federally funded residential job training program for low income persons 16--24 years of age. Discussion details the curriculum and methods used in the program including classroom, shop and community service projects. Solar technologies including all types of hot water heating, swimming pool and spa as well as photovoltaics are included.

  16. Job satisfaction of overseas-qualified nurses working in Australian hospitals.

    Science.gov (United States)

    Timilsina Bhandari, K K; Xiao, L D; Belan, I

    2015-03-01

    The aims of this study were to explore factors associated with the job satisfaction of overseas-qualified nurses working in public hospitals in South Australia and to compare whether factors associated with job satisfaction of overseas nurses from English-speaking backgrounds differed from those from non-English-speaking backgrounds. Overseas-qualified nurses have become an essential part of the nursing workforce in Australia. Although this nurse population has different expectations and values in relation to their jobs when compared with local nurses, studies on job satisfaction among overseas nurses are scarce. A cross-sectional survey using the Job Satisfaction of Overseas-Qualified Nurses questionnaire was conducted in five major public hospitals in South Australia. One hundred and fifty-one overseas-qualified nurses completed the questionnaire. Four factors were found to influence job satisfaction: Supportive work environment, interpersonal relationships, communication in English, and salary and salary-related benefits. Communication in English was the predominant factor that was associated with job satisfaction in nurses from non-English-speaking backgrounds. This group of nurses also showed a negative correlation between length of stay in Australia and satisfaction with their work environment. Participants' responses to open-ended questions revealed issues relating to discrimination and racism. Supportive work environment, interpersonal relationships, communication in English, and salary and salary-related benefits were major factors associated with job satisfaction in overseas-qualified nurses in this study. Nurses from non-English-speaking backgrounds faced additional challenges in communication in the workplace and in dealing with issues of discrimination and racism. Nurses from non-English-speaking backgrounds need to be supported early in their employment, especially with their communication skills. Consideration also needs to be given to the education

  17. Electrical installation calculations basic

    CERN Document Server

    Kitcher, Christopher

    2013-01-01

    All the essential calculations required for basic electrical installation workThe Electrical Installation Calculations series has proved an invaluable reference for over forty years, for both apprentices and professional electrical installation engineers alike. The book provides a step-by-step guide to the successful application of electrical installation calculations required in day-to-day electrical engineering practice. A step-by-step guide to everyday calculations used on the job An essential aid to the City & Guilds certificates at Levels 2 and 3Fo

  18. Nuclear Installations Act 1965

    International Nuclear Information System (INIS)

    1965-01-01

    This Act governs all activities related to nuclear installations in the United Kingdom. It provides for the licensing procedure for nuclear installations, the duties of licensees, the competent authorities and carriers of nuclear material in respect of nuclear occurrences, as well as for the system of third party liability and compensation for nuclear damage. The Act repeals the Nuclear Installations (Licensing and Insurance) Act 1959 and the Nuclear Installations (Amendment Act) 1965 except for its Section 17(2). (NEA) [fr

  19. Qualified operator training in the simulated control room environment

    International Nuclear Information System (INIS)

    Ionescu, Teodor; Studineanu, Emil; Radulescu, Catalina; Bolocan, Gabriel

    2005-01-01

    Full text: Mainly designed for the training of the Cernavoda NPP Unit 2 operators, the virtual simulated environment allows the training of the already qualified operators for Cernavoda NPP Unit 1, adding to the already trained knowledge, the differences which has occurred in the Unit 2 design. Using state-of-the-art computers and displays and qualified software, the virtual simulated panels could offer a viable alternative to classic hardware-based training. This approach allows quick training of the new procedures required by the new configuration of the re-designed operator panels in the main control room of Cernavoda NPP Unit 2. (authors)

  20. Qualified operator training in the simulated control room environment

    International Nuclear Information System (INIS)

    Ionescu, Teodor; Studineanu, Emil; Radulescu, Catalina; Bolocan, Gabriel

    2005-01-01

    Mainly designed for the training of the Cernavoda NPP Unit 2 operators, the virtual simulated environment allows the training of the already qualified operators for Cernavoda NPP Unit 1, adding to the already trained knowledge, the differences which have occurred in the Unit 2 design. Using state-of-the-art computers and displays and qualified software, the virtual simulated panels could offer a viable alternative to classic hardware-based training. This approach allows quick training of the new procedures required by the new configuration of the re-designed operator panels in the main control room of Cernavoda NPP Unit 2. (authors)

  1. Profitability of Qualified-Labour-Power Production

    Science.gov (United States)

    Baldino, Roberto Ribeiro; Cabral, Tânia Cristina Baptista

    2015-01-01

    In Baldino and Cabral (2013) we introduced the concept of qualified labour-power as the commodity produced by the school system. In the present article we outline a quantitative model to evaluate the profit rate of educational programmes. We compare a medical school programme with a teacher education programme at a public university in Brazil,…

  2. Tricks of the trade: time management tips for newly qualified doctors.

    Science.gov (United States)

    Offiah, Gozie; Doherty, Eva

    2018-03-01

    The transition from medical student to doctor is an important milestone. The discovery that their time is no longer their own and that the demands of their job are greater than the time they have available is extremely challenging. At a recent surgical boot camp training programme, 60 first-year surgical trainees who had just completed their internship were invited to reflect on the lessons learnt regarding effective time management and to recommend tips for their newly qualified colleagues. They were asked to identify clinical duties that were considered urgent and important using the time management matrix and the common time traps encountered by newly qualified doctors. The surgical trainees identified several practical tips that ranged from writing a priority list to working on relationships within the team. These tips are generic and so applicable to all newly qualified medial doctors. We hope that awareness of these tips from the outset as against learning them through experience will greatly assist newly qualified doctors. © Article author(s) (or their employer(s) unless otherwise stated in the text of the article) 2018. All rights reserved. No commercial use is permitted unless otherwise expressly granted.

  3. Electrical installation calculations advanced

    CERN Document Server

    Kitcher, Christopher

    2013-01-01

    All the essential calculations required for advanced electrical installation workThe Electrical Installation Calculations series has proved an invaluable reference for over forty years, for both apprentices and professional electrical installation engineers alike. The book provides a step-by-step guide to the successful application of electrical installation calculations required in day-to-day electrical engineering practiceA step-by-step guide to everyday calculations used on the job An essential aid to the City & Guilds certificates at Levels 2 and 3For apprentices and electrical installatio

  4. Electrical installations and regulations

    CERN Document Server

    Whitfield, J F

    1966-01-01

    Electrical Installations and Regulations focuses on the regulations that apply to electrical installations and the reasons for them. Topics covered range from electrical science to alternating and direct current supplies, as well as equipment for providing protection against excess current. Cables, wiring systems, and final subcircuits are also considered, along with earthing, discharge lighting, and testing and inspection.Comprised of 12 chapters, this book begins with an overview of electrical installation work, traits of a good electrician, and the regulations governing installations. The r

  5. Implementing shared decision making in federally qualified health centers, a quasi-experimental design study: the Office-Guidelines Applied to Practice (Office-GAP) program.

    Science.gov (United States)

    Olomu, Adesuwa; Hart-Davidson, William; Luo, Zhehui; Kelly-Blake, Karen; Holmes-Rovner, Margaret

    2016-08-02

    Use of Shared Decision-Making (SDM) and Decision Aids (DAs) has been encouraged but is not regularly implemented in primary care. The Office-Guidelines Applied to Practice (Office-GAP) intervention is an application of a previous model revised to address guidelines based care for low-income populations with diabetes and coronary heart disease (CHD). To evaluate Office-GAP Program feasibility and preliminary efficacy on medication use, patient satisfaction with physician communication and confidence in decision in low-income population with diabetes and coronary heart disease (CHD) in a Federally Qualified Healthcare Center (FQHC). Ninety-five patients participated in an Office-GAP program. A quasi-experimental design study, over 6 months with 12-month follow-up. Office-GAP program integrates health literacy, communication skills education for patients and physicians, patient/physician decision support tools and SDM into routine care. 1) Implementation rates of planned program elements 2) Patient satisfaction with communication and confidence in decision, and 3) Medication prescription rates. We used the GEE method for hierarchical logistic models, controlling for confounding. Feasibility of the Office-GAP program in the FQHC setting was established. We found significant increase in use of Aspirin/Plavix, statin and beta-blocker during follow-up compared to baseline: Aspirin OR 1.5 (95 % CI: 1.1, 2.2) at 3-months, 1.9 (1.3, 2.9) at 6-months, and 1.8 (1.2, 2.8) at 12-months. Statin OR 1.1 (1.0, 1.3) at 3-months and 1.5 (1.1, 2.2) at 12-months; beta-blocker 1.8 (1.1, 2.9) at 6-months and 12-months. Program elements were consistently used (≥ 98 % clinic attendance at training and tool used). Patient satisfaction with communication and confidence in decision increased. The use of Office-GAP program to teach SDM and use of DAs in real time was demonstrated to be feasible in FQHCs. It has the potential to improve satisfaction with physician communication and

  6. Nuclear medicine installations supervisors interactive course (CD-ROM)

    International Nuclear Information System (INIS)

    Williart, A.; Shaw, M.; Tellez, M.

    2000-01-01

    . Each chapter has: At the beginning one schedule of the objectives, in order for the student to realise what are the most important concepts. Basic theoretical knowledge adjusted to the specific guide of the C.S.N., with an actualised bibliographic revision. The fundamental concepts are linked with an interactive dictionary. Explanatory pictures and graphics, with which the student can visualise the concept. A summary at the end. Multichoice questions, aleatoraly chosen by the program from a question database. When the student ends the chapter, the program generates a self-evaluating test. With that the student notices if he has the sufficient knowledge to pass to the following chapter. He can realise if he improves in the study or not, in an enhanced self-learning. Besides there are seminars where the most difficult topics are explained. Some small groups will gather for concrete practical work. Both seminars and experiences are planned for a few weekends, to make easy to attend them. Also the students can be in touch with us in tutorial time, by phone or by e-mail. This course will make easier to more professionals to acquire, by using new information technologies, the necessary knowledge to be Nuclear Medicine Installations Supervisor. (author)

  7. 'Practising under your own Pin'- a description of the transition experiences of newly qualified midwives.

    Science.gov (United States)

    Avis, Mark; Mallik, Maggie; Fraser, Diane M

    2013-11-01

    Transition experiences of newly qualified midwives were examined in depth during the third phase of a UK evaluation study of midwifery education. The fitness to practise and the retention of newly qualified nursing and midwifery graduates are pressing concerns for health care managers. The advantages of preceptorship are reported in the literature but the content and timing of schemes remain unclear. A semi-structured diary was kept for up to 6 months by 35 newly qualified midwives in 18 work sites covering all countries in the UK. The preceptor and supervisor of midwives for each newly qualified midwife completed short questionnaires about their preceptee's performance, and a further sub-sample of newly qualified midwives and preceptors participated in a semi-structured interview. Data were analysed to elicit aspects of newly qualified midwives transition experiences. Findings confirm that structured preceptorship schemes are not widely available. Newly qualified midwives primarily obtained transition support from members of the midwifery team. Although perceived as competent, there is no demarcation point in becoming confident to practise as a registered practitioner. Implications for managers include the importance of a supportive culture within clinical teams for successful transition and the introduction of structured preceptorship schemes facilitated by appropriate rotation patterns. © 2012 John Wiley & Sons Ltd.

  8. 26 CFR 1.468B-2 - Taxation of qualified settlement funds and related administrative requirements.

    Science.gov (United States)

    2010-04-01

    ... 26 Internal Revenue 6 2010-04-01 2010-04-01 false Taxation of qualified settlement funds and... Taken § 1.468B-2 Taxation of qualified settlement funds and related administrative requirements. (a) In...) of this section is in lieu of any other taxation of the income of a qualified settlement fund under...

  9. TESLA accelerator installation

    International Nuclear Information System (INIS)

    Neskovic, N.; Ostojic, R.; Susini, A.; Milinkovic, Lj.; Ciric, D.; Dobrosavljevic, A.; Brajuskovic, B.; Cirkovic, S.; Bojovic, B.; Josipovic, M.

    1992-01-01

    The TESLA accelerator Installation is described. Its main parts are the VINCY Cyclotron, the multiply charged heavy-ion mVINIS Ion Source, and the negative light-ion pVINIS Ion Source. The Installation should be the principal installation of a regional center for basic and applied research in nuclear physics, atomic physics, surface physics and solid state physics, for production of radioisotopes, for research and therapy in nuclear medicine. The first extraction of the ion beam from the Cyclotron is planned for 1995. (R.P.) 3 refs.; 1 fig

  10. Nuclear installations safety and protection: thirty years of researches on earthquakes at the IRSN; Surete et protection des installations nucleaires: trente ans de recherches a l'IRSN sur les seismes

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2003-03-01

    Every years more than one hundred earthquakes occur in France. Taking into account this risk is essential for the safety of nuclear installations. In this context the IRSN develops research programs on earthquakes and realizes evolutions of safety procedures. This paper presents three sheets of researches realized by the IRSN on earthquakes risk assessment in the nuclear installations design and exploitation and the example of the Saint-Die earthquake. (A.L.B.)

  11. Planning and installing micro-hydro systems a guide for designers, installers and engineers

    CERN Document Server

    Elliott, Chris

    2014-01-01

    An essential addition to the Earthscan Planning & Installing series, Planning and Installing Micro-Hydro Systems provides vital diagrams, pictures and tables detailing the planning and installing of a micro-hydro system, including information on the maintenance and economics once an installation is running. The book covers subjects such as measuring head and flow, ecological impacts, scheme layouts, practical advice, calculations and turbine choice. Archimedes screws are also covered in detail, as well as the main conventional choices relevant to small sites.Micro-hydro refers to hydropower sy

  12. Elementary number theory with programming

    CERN Document Server

    Lewinter, Marty

    2015-01-01

    A successful presentation of the fundamental concepts of number theory and computer programming Bridging an existing gap between mathematics and programming, Elementary Number Theory with Programming provides a unique introduction to elementary number theory with fundamental coverage of computer programming. Written by highly-qualified experts in the fields of computer science and mathematics, the book features accessible coverage for readers with various levels of experience and explores number theory in the context of programming without relying on advanced prerequisite knowledge and con

  13. Algorithm of composing the schedule of construction and installation works

    Science.gov (United States)

    Nehaj, Rustam; Molotkov, Georgij; Rudchenko, Ivan; Grinev, Anatolij; Sekisov, Aleksandr

    2017-10-01

    An algorithm for scheduling works is developed, in which the priority of the work corresponds to the total weight of the subordinate works, the vertices of the graph, and it is proved that for graphs of the tree type the algorithm is optimal. An algorithm is synthesized to reduce the search for solutions when drawing up schedules of construction and installation works, allocating a subset with the optimal solution of the problem of the minimum power, which is determined by the structure of its initial data and numerical values. An algorithm for scheduling construction and installation work is developed, taking into account the schedule for the movement of brigades, which is characterized by the possibility to efficiently calculate the values of minimizing the time of work performance by the parameters of organizational and technological reliability through the use of the branch and boundary method. The program of the computational algorithm was compiled in the MatLAB-2008 program. For the initial data of the matrix, random numbers were taken, uniformly distributed in the range from 1 to 100. It takes 0.5; 2.5; 7.5; 27 minutes to solve the problem. Thus, the proposed method for estimating the lower boundary of the solution is sufficiently accurate and allows efficient solution of the minimax task of scheduling construction and installation works.

  14. 29 CFR 779.382 - May qualify as exempt 13(a)(2) establishments.

    Science.gov (United States)

    2010-07-01

    ... STANDARDS ACT AS APPLIED TO RETAILERS OF GOODS OR SERVICES Exemptions for Certain Retail or Service Establishments Hotels and Motels § 779.382 May qualify as exempt 13(a)(2) establishments. A hotel or motel establishment may qualify as an exempt retail or service establishment under section 13(a)(2) of the Act...

  15. Installation Art

    DEFF Research Database (Denmark)

    Petersen, Anne Ring

    . In Installation Art: Between Image and Stage, Anne Ring Petersen aims to change that. She begins by exploring how installation art developed into an interdisciplinary genre in the 1960s, and how its intertwining of the visual and the performative has acted as a catalyst for the generation of new artistic......Despite its large and growing popularity – to say nothing of its near-ubiquity in the world’s art scenes and international exhibitions of contemporary art –installation art remains a form whose artistic vocabulary and conceptual basis have rarely been subjected to thorough critical examination...... phenomena. It investigates how it became one of today’s most widely used art forms, increasingly expanding into consumer, popular and urban cultures, where installation’s often spectacular appearance ensures that it meets contemporary demands for sense-provoking and immersive cultural experiences. The main...

  16. Installation Art

    DEFF Research Database (Denmark)

    Petersen, Anne Ring

    Despite its large and growing popularity – to say nothing of its near-ubiquity in the world’s art scenes and international exhibitions of contemporary art –installation art remains a form whose artistic vocabulary and conceptual basis have rarely been subjected to thorough critical examination....... In Installation Art: Between Image and Stage, Anne Ring Petersen aims to change that. She begins by exploring how installation art developed into an interdisciplinary genre in the 1960s, and how its intertwining of the visual and the performative has acted as a catalyst for the generation of new artistic...... phenomena. It investigates how it became one of today’s most widely used art forms, increasingly expanding into consumer, popular and urban cultures, where installation’s often spectacular appearance ensures that it meets contemporary demands for sense-provoking and immersive cultural experiences. The main...

  17. The role of installers for thermo-technical installations when buying gas boilers

    Directory of Open Access Journals (Sweden)

    Jovičić Dragoljub

    2013-01-01

    Full Text Available This study presents the research of role installers for thermo-technical installations when buying gas boilers in the Serbian market. Considering the fact that installers are significantly different, they are grouped by specific, relevant characteristics. The research is focused on the evaluation of marketing mix instruments by nine identified segments of installers. Moreover, research has been explored deeper through conclusion installers about the most important and most credible sources of information on gas boilers. During the research were used secondary and primary data sources. Besides the research at the table, field research has been also done by unstructured personal communication. All collected data were analyzed in details and both hypothesis were tested, where one of them is partially confirmed, and another one fully confirm. Given results can be useful for marketers and their anticipation of demand. Also these results can be used for creating optimal marketing strategy in the Serbian market of gas boilers.

  18. Automated installation methods for photovoltaic arrays

    Science.gov (United States)

    Briggs, R.; Daniels, A.; Greenaway, R.; Oster, J., Jr.; Racki, D.; Stoeltzing, R.

    1982-11-01

    Since installation expenses constitute a substantial portion of the cost of a large photovoltaic power system, methods for reduction of these costs were investigated. The installation of the photovoltaic arrays includes all areas, starting with site preparation (i.e., trenching, wiring, drainage, foundation installation, lightning protection, grounding and installation of the panel) and concluding with the termination of the bus at the power conditioner building. To identify the optimum combination of standard installation procedures and automated/mechanized techniques, the installation process was investigated including the equipment and hardware available, the photovoltaic array structure systems and interfaces, and the array field and site characteristics. Preliminary designs of hardware for both the standard installation method, the automated/mechanized method, and a mix of standard installation procedures and mechanized procedures were identified to determine which process effectively reduced installation costs. In addition, costs associated with each type of installation method and with the design, development and fabrication of new installation hardware were generated.

  19. Space-Qualified Traveling-Wave Tube

    Science.gov (United States)

    Wilson, Jeffrey D.; Krawczyk, Richard; Simons, Rainee N.; Williams, Wallace D.; Robbins, Neal R.; Dibb, Daniel R.; Menninger, William L.; Zhai, Xiaoling; Benton, Robert T.

    2010-01-01

    The L-3 Communications Electron Technologies, Inc. Model 999HA traveling-wave tube (TWT), was developed for use as a high-power microwave amplifier for high-rate transmission of data and video signals from deep space to Earth (see figure). The 999HA is a successor to the 999H a non-space qualified TWT described in High-Power, High-Efficiency Ka-Band Traveling-Wave Tube (LEW-17900-1), NASA Tech Briefs, Vol. 31, No. 2 (February 2007), page 32. Operating in the 31.8-to-32.3 GHz frequency band, the 999HA has been shown to generate 252 W of continuous- wave output power at 62 percent overall power efficiency a 75-percent increase in output power over the 999H. The mass of the 999HA is 35 percent less than that of the 999H. Moreover, taking account of the elimination of a Faraday cage that is necessary for operation of the 999H but is obviated by a redesign of high-voltage feed-throughs for the 999HA, the overall reduction in mass becomes 57 percent with an 82 percent reduction in volume. Through a series of rigorous tests, the 999HA has been qualified for operation aboard spacecraft with a lifetime exceeding seven years. Offspring of the 999HA will fly on the Kepler and Lunar Reconnaissance Orbiter missions.

  20. 26 CFR 1.989(a)-1 - Definition of a qualified business unit.

    Science.gov (United States)

    2010-04-01

    ... 26 Internal Revenue 10 2010-04-01 2010-04-01 false Definition of a qualified business unit. 1.989... definition of the term “qualified business unit” (QBU) within the meaning of section 989. (2) Effective date... (CONTINUED) INCOME TAX (CONTINUED) INCOME TAXES Export Trade Corporations § 1.989(a)-1 Definition of a...

  1. 9 CFR 85.6 - Interstate movement of pseudorabies vaccinate swine, except swine from qualified negative gene...

    Science.gov (United States)

    2010-01-01

    ... vaccinate swine, except swine from qualified negative gene-altered vaccinated herds, not known to be..., except swine from qualified negative gene-altered vaccinated herds, not known to be infected with or exposed to pseudorabies. Pseudorabies vaccinate swine, except swine from qualified negative gene-altered...

  2. Analysis of Bright Harvest Remote Analysis for Residential Solar Installations

    Energy Technology Data Exchange (ETDEWEB)

    Nangle, John [National Renewable Energy Lab. (NREL), Golden, CO (United States); Simon, Joseph [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2015-06-17

    Bright Harvest provides remote shading analysis and design products for residential PV system installers. The National Renewable Energy Laboratory (NREL) through the NREL Commercialization Assistance Program, completed comparative assessments between on-site measurements and remotely calculated values to validate the accuracy of Bright Harvest’s remote shading and power generation.

  3. 75 FR 1831 - Seeks Qualified Candidates for the Advisory Committee on Reactor Safeguards

    Science.gov (United States)

    2010-01-13

    ... NUCLEAR REGULATORY COMMISSION Seeks Qualified Candidates for the Advisory Committee on Reactor... Regulatory Commission (NRC) seeks qualified candidates for the Advisory Committee on Reactor Safeguards (ACRS... amended. ACRS provides independent expert advice on matters related to the safety of existing and proposed...

  4. Analysis of Installed Measures and Energy Savings for Single-Family Residential Better Buildings Projects

    Energy Technology Data Exchange (ETDEWEB)

    Heaney, M. [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Polly, B. [National Renewable Energy Laboratory (NREL), Golden, CO (United States)

    2015-04-30

    This report presents an analysis of data for residential single-family projects reported by 37 organizations that were awarded federal financial assistance (cooperative agreements or grants) by the U.S. Department of Energy’s Better Buildings Neighborhood Program.1 The report characterizes the energy-efficiency measures installed for single-family residential projects and analyzes energy savings and savings prediction accuracy for measures installed in a subset of those projects.

  5. Idaho National Engineering Laboratory installation roadmap document. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    1993-05-30

    The roadmapping process was initiated by the US Department of Energy`s office of Environmental Restoration and Waste Management (EM) to improve its Five-Year Plan and budget allocation process. Roadmap documents will provide the technical baseline for this planning process and help EM develop more effective strategies and program plans for achieving its long-term goals. This document is a composite of roadmap assumptions and issues developed for the Idaho National Engineering Laboratory (INEL) by US Department of Energy Idaho Field Office and subcontractor personnel. The installation roadmap discusses activities, issues, and installation commitments that affect waste management and environmental restoration activities at the INEL. The High-Level Waste, Land Disposal Restriction, and Environmental Restoration Roadmaps are also included.

  6. Border installations

    International Nuclear Information System (INIS)

    Lenaerts, Koen

    1988-01-01

    Border installations cover all nuclear plants located near the border with a neighbouring state. However, the actual distance depends on the context. The distance can vary considerably. Also the prohibition on siting near a heavily populated area also defines the actual distance variably. The distance criteria may be modified by other factors of topography, prevailing climate and so on. Various examples which illustrate the problems are given. For example, the Creys-Melville nuclear power plant is 80km from Geneva and the Cattonam installation is 12km from the French border with Luxembourg and Germany. The Cattenom case is explained and the legal position within the European Institutions is discussed. The French licensing procedures for nuclear power stations are described with special reference to the Cattenom power plant. Border installations are discussed in the context of European Community Law and Public International Law. (U.K.)

  7. NRC/RSR Data Bank Program

    International Nuclear Information System (INIS)

    Bankert, S.F.; Evans, C.D.; Hardy, H.A.; Litteer, G.L.; Schulz, G.L.; Smith, N.C.

    1978-01-01

    The United States Nuclear Regulatory Commission (NRC) has established the NRC/Reactor Safety Research (RSR) Data Bank Program at the Idaho National Engineering Laboratory (INEL). The program provides the means of collecting, storing, and making available experimental data from the many water reactor safety research programs in the United States and other countries. The program collects qualified engineering data on a prioritized basis from experimental program data bases, stores the data in a single data bank in a common format, and makes the data available to users

  8. 26 CFR 1.6050S-4 - Information reporting for payments of interest on qualified education loans.

    Science.gov (United States)

    2010-04-01

    ... on qualified education loans. 1.6050S-4 Section 1.6050S-4 Internal Revenue INTERNAL REVENUE SERVICE... Information reporting for payments of interest on qualified education loans. (a) Electronic furnishing of... payments of interest on qualified education loans (furnisher) to the individual to whom it is required to...

  9. Design, Observing and Data Systems, and Final Installation of the NEPTUNE Canada Regional Cabled Ocean Observatory

    Science.gov (United States)

    Barnes, C. R.; Best, M. M.; Johnson, F. R.; Phibbs, P.; Pirenne, B.

    2009-05-01

    NEPTUNE Canada (NC; www.neptunecanada.ca) will complete most of the installation of the world's first regional cabled ocean observatory in late 2009 off Canada's west coast. It will comprise five main observatory nodes (100-2700m water depths) linked by an 800km backbone cable delivering 10kVDC power and 10Gbps communications bandwidth to hundreds of sensors, with a 25-year design life. Infrastructure (100M) and initial operational funding (20M) is secured. University of Victoria (UVic) leads a consortium of 12 Canadian universities, hosts the coastal VENUS cabled observatory, with Ocean Networks Canada (ONC) providing management oversight. Observatory architecture has a trunk and branch topology. Installed in late 2007, the backbone cable loops from/to UVic's Port Alberni shore station. The wet plant's design, manufacture and installation was contracted to Alcatel-Lucent. Each node provides six interface ports for connection of science instrument arrays or extensions. Each port provides dual optical Ethernet links and up to 9kW of electrical power at 400VDC. Junction boxes, designed and built by OceanWorks support up to 10 instruments each and can be daisy- chained. They accommodate both serial and 10/100 Ethernet instruments, and provide a variety of voltages (400V, 48V, 24V, 15V). Backbone equipment has all been qualified and installed; shore station re-equipping is complete; junction boxes are manufactured. A major marine program will deploy nodes and instruments in July-September 2009; instruments to one node will probably be deferred until 2010. Observatory instruments will be deployed in subsurface (boreholes), on seabed, and buoyed through the water column. Over 130 instruments (over 40 different types) will host several hundred sensors; mobile assets include a tethered crawler and a 400m vertical profiler. Experiments will address: earthquake dynamics and tsunami hazards; fluid fluxes in both ocean crust and sediments, including gas hydrates; ocean

  10. High-Performance, Space-Storable, Bi-Propellant Program Status

    Science.gov (United States)

    Schneider, Steven J.

    2002-01-01

    Bipropellant propulsion systems currently represent the largest bus subsystem for many missions. These missions range from low Earth orbit satellite to geosynchronous communications and planetary exploration. The payoff of high performance bipropellant systems is illustrated by the fact that Aerojet Redmond has qualified a commercial NTO/MMH engine based on the high Isp technology recently delivered by this program. They are now qualifying a NTO/hydrazine version of this engine. The advanced rhenium thrust chambers recently provided by this program have raised the performance of earth storable propellants from 315 sec to 328 sec of specific impulse. The recently introduced rhenium technology is the first new technology introduced to satellite propulsion in 30 years. Typically, the lead time required to develop and qualify new chemical thruster technology is not compatible with program development schedules. These technology development programs must be supported by a long term, Base R&T Program, if the technology s to be matured. This technology program then addresses the need for high performance, storable, on-board chemical propulsion for planetary rendezvous and descent/ascent. The primary NASA customer for this technology is Space Science, which identifies this need for such programs as Mars Surface Return, Titan Explorer, Neptune Orbiter, and Europa Lander. High performance (390 sec) chemical propulsion is estimated to add 105% payload to the Mars Sample Return mission or alternatively reduce the launch mass by 33%. In many cases, the use of existing (flight heritage) propellant technology is accommodated by reducing mission objectives and/or increasing enroute travel times sacrificing the science value per unit cost of the program. Therefore, a high performance storable thruster utilizing fluorinated oxidizers with hydrazine is being developed.

  11. New atmospheric program

    Science.gov (United States)

    The National Science Foundation's Division of Atmospheric Sciences has established an Upper Atmospheric Facilities program within its Centers and Facilities section. The program will support the operation of and the scientific research that uses the longitudinal chain of incoherent scatter radars. The program also will ensure that the chain is maintained as a state-of-the-art research tool available to all interested and qualified scientists.For additional information, contact Richard A. Behnke, Division of Atmospheric Sciences, National Science Foundation, 1800 G Street, N.W., Washington, DC 20550 (telephone: 202-357-7390).

  12. Groundwater quality monitoring well installation for Waste Area Grouping 3 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    Mortimore, J.A.; Ebers, M.L.

    1994-09-01

    This report documents the drilling and installation of 15 groundwater quality monitoring (GQM) wells on the perimeter of Waste Area Grouping (WAG) 3. WAG 3 is located in Melton Valley, approximately 3,000 ft west of the west gate of Oak Ridge National Laboratory, and consists of an estimated 22 acres. The subject site contains three solid waste management units: the Contractors' Landfill, the Closed Scrap Metal Area, and Solid Waste Storage Area 3. The wells at WAG 3 were drilled and developed between September 1987 and August 1990. These wells were installed to characterize and assess the WAG in accordance with applicable Department of Energy, state, and Environmental Protection Agency regulatory requirements. The wells at WAG 3 were drilled with auger or air rotary rigs. Depending upon the hydrogeologic conditions present at each proposed well location, one of four basic installation methods was utilized. The purpose of the well installation program was to install GQM wells for groundwater characterization at WAG 3. Data packages produced during installation activities by the ERCE hydrogeologists are an important product of the program. These packages document the well drilling, installation, and development activities and provide valuable data for well sampling and WAG characterization. The forms contained in the packages include predrilling and postdrilling checklists, drilling and construction logs, development and hydraulic conductivity records, and quality control-related documents

  13. A calculation code for estimating the global inventory of tritium from the ICSI Pilot Installation

    International Nuclear Information System (INIS)

    Pavelescu, Alexandru Octavian; Prisecaru, Ilie; Stefanescu, Ioan

    2007-01-01

    The paper describes the TRITINV program which performs a global updating of the total tritium inventory within the whole ICSI heavy water detritiation installation. The calculation does not take into account the distribution or the type of the tritium inventory on the installation modules. The program stores all the values submitted by user or computed, into a database which is permanently upgraded. It can also create charts based on its data and print or export this data in other formats. The application has been successfully tested and responded well to the initial requirements. It can be modified or improved anytime using the Microsoft Access 2003 Program. An important advancement would consist in upgrading the TRITINV into a stand-alone application by editing and compiling it in Microsoft Visual Studio 2005. (authors)

  14. European Fusion Materials Research Program - Recent Results and Future Strategy

    International Nuclear Information System (INIS)

    Diegele, E.; Andreani, R.; Laesser, R.; Schaaf, B. van der

    2005-01-01

    The paper reviews the objectives and the status of the current EU long-term materials program. It highlights recent results, discusses some of the key issues and major existing problems to be resolved and presents an outlook on the R and D planned for the next few years. The main objectives of the Materials Development program are the development and qualification of reduced activation structural materials for the Test Blanket Modules (TBMs) in ITER and of low activation structural materials resistant to high fluence neutron irradiation for in-vessel components such as breeding blanket, divertor and first wall in DEMO. The EU strategy assumes: (i) ITER operation starting in 2015 with DEMO relevant Test Blanket Modules to be installed from day one of operation, (ii) IFMIF operation in 2017 and (iii) DEMO final design activities in 2022 to 2025. The EU candidate structural material EUROFER for TBMs has to be fully code qualified for licensing well before 2015. In parallel, research on materials for operation at higher temperatures is conducted following a logical sequence, by supplementing EUROFER with the oxide dispersion strengthened ferritic steels and, thereafter, with fibre-reinforced Silicon Carbide (SiC f /SiC). Complementary, tungsten alloys are developed as structural material for high temperature applications such as gas-cooled divertors

  15. 49 CFR 40.281 - Who is qualified to act as a SAP?

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 1 2010-10-01 2010-10-01 false Who is qualified to act as a SAP? 40.281 Section... § 40.281 Who is qualified to act as a SAP? To be permitted to act as a SAP in the DOT drug and alcohol.... (2) You must be knowledgeable about the SAP function as it relates to employer interests in safety...

  16. Installation for producing sealed radioactive sources; Installation de fabrication de sources radioactives scellees

    Energy Technology Data Exchange (ETDEWEB)

    Fradin, J; Hayoun, C [Commissariat a l' Energie Atomique, 91 - Saclay (France). Centre d' Etudes Nucleaires

    1969-07-01

    This installation has been designed and built for producing sealed sources of fission elements: caesium 137, strontium 90, promethium 147, ruthenium 106 and cerium 144 in particular. The installation consists of sealed and protected cells, each being assigned to a particular production. The safety and the operational reliability of the equipment are the principal considerations which have governed this work. The report describes the installation and, in particular, the apparatus used as well as the various control devices. In conclusion, a review as presented of six years operation. (authors) [French] Cette installation a ete concue et realisee pour effectuer des fabrications de sources scellees d'elements de fission: caesium 137 - strontium 90 - promethium 147 - ruthenium 106 - cerium 144 en particulier. L'installation est composee de cellules etanches et protegees, chacune d'elles etant affectee a une fabrication particuliere. La securite et la surete de fonctionnement de l'ensemble sont parmi les elements principaux qui ont guide l'etude. Le rapport decrit l'installation et plus particulierement l'appareillage utilise ainsi que les divers controles et commandes. Le bilan de fonctionnement apres 6 ans d'exploitation sert de conclusion. (auteurs)

  17. Installation for producing sealed radioactive sources; Installation de fabrication de sources radioactives scellees

    Energy Technology Data Exchange (ETDEWEB)

    Fradin, J.; Hayoun, C. [Commissariat a l' Energie Atomique, 91 - Saclay (France). Centre d' Etudes Nucleaires

    1969-07-01

    This installation has been designed and built for producing sealed sources of fission elements: caesium 137, strontium 90, promethium 147, ruthenium 106 and cerium 144 in particular. The installation consists of sealed and protected cells, each being assigned to a particular production. The safety and the operational reliability of the equipment are the principal considerations which have governed this work. The report describes the installation and, in particular, the apparatus used as well as the various control devices. In conclusion, a review as presented of six years operation. (authors) [French] Cette installation a ete concue et realisee pour effectuer des fabrications de sources scellees d'elements de fission: caesium 137 - strontium 90 - promethium 147 - ruthenium 106 - cerium 144 en particulier. L'installation est composee de cellules etanches et protegees, chacune d'elles etant affectee a une fabrication particuliere. La securite et la surete de fonctionnement de l'ensemble sont parmi les elements principaux qui ont guide l'etude. Le rapport decrit l'installation et plus particulierement l'appareillage utilise ainsi que les divers controles et commandes. Le bilan de fonctionnement apres 6 ans d'exploitation sert de conclusion. (auteurs)

  18. Numerical simulation of installation of skirt foundations

    Energy Technology Data Exchange (ETDEWEB)

    Vangelsten, Bjoern Vidar

    1997-12-31

    Skirt foundation has been increasingly used for permanent offshore oil installations and anchors for drilling ships. Suction is commonly used in skirt foundation installing. If a large amount of suction is applied, the soil around the foundation may fail and the foundation become useless. This thesis studies failure due to high seepage gradients, aiming to provide a basis for reducing the risk of such failures. Skirt penetration model testing has shown that to solve the problem one must understand what is going on at the skirt tip during suction installation. A numerical model based on micro mechanics was developed as continuum hypothesis was seen to be unsuitable to describe the processes in the critical phases of the failure. The numerical model combines two-dimensional elliptical particles with the finite difference method for flow to model water flow in a granular material. The key idea is to formulate the permeability as a function of the porosity of the grain assembly and so obtain an interaction between the finite difference method on flow and the particle movement. A computer program, DYNELL, was developed and used to simulate: (1) weight penetration of a skirt wall, (2) combined suction and weight penetration of a skirt wall, and (3) critical gradient tests around a skirt wall to study failure mechanisms. The model calculations agree well with laboratory experiments. 16 refs., 124 figs., 21 tabs.

  19. Groundwater quality monitoring well installation for Waste Area Grouping 17 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    Mortimore, J.A.; Ebers, M.L.

    1994-09-01

    This report documents the drilling and installation of groundwater quality monitoring (GQM) wells on the perimeter of Waste Area Grouping (WAG) 17. WAG 17 is composed of approximately 23 acres and is located in Bethel Valley about 3,100 ft east of the Oak Ridge National Laboratory (ORNL) main plant area. The facilities in WAG 17 constitute the ORNL Services Area and include the shipping and receiving departments, machine shops, carpenter shops, paint shops, lead burning facilities, tritium facility, and the materials storage area. The wells at WAG 17 were drilled and developed between November 1989 and April 1990. These wells were installed to characterize and assess the WAG in accordance with applicable Department of Energy, state, and Environmental Protection Agency regulatory requirements. The purpose of the well installation program was to install GQM wells for groundwater characterization at WAG 17. Data packages produced during installation activities by the ERCE hydrogeologists are an important product of the program. These packages document the well drilling, installation, and development activities and provide valuable data for well sampling and WAG 17 characterization. The forms contained in the packages include predrilling and postdrilling checklists, drilling and construction logs, development and hydraulic conductivity records, and quality control-related documents

  20. 75 FR 1843 - Medicare and Medicaid Programs; Electronic Health Record Incentive Program

    Science.gov (United States)

    2010-01-13

    ... Payment Calculation for Eligible Hospitals c. Medicare Share d. Charity Care e. Transition Factor f...) and eligible hospitals participating in Medicare and Medicaid programs that adopt and meaningfully use... an EP and eligible hospital must meet in order to qualify for the incentive payment; calculation of...

  1. Sizewell 'B' cable installation

    International Nuclear Information System (INIS)

    Gemmell, D.R.

    1992-01-01

    N G Bailey and Co. Ltd., UK were awarded the contract for the procurement, manufacture, works testing, works finishing, supply, delivery, off-loading, storage, installation, site finishing, preservation, setting to work and site testing of the following; the main cable installation throughout the Station including the addition of the Radioactive Waste Building, earthing and lightning protection installation, cable supporting steelwork and carriers and glanding and termination of cables. The cabling installation comprises power distribution, control and instrumentation cabling including all the associated cabling accessories, terminal boxes and similar components. The way that the contract was set-up, awarded and is now being carried out is described. Planning and industrial relations have been key features of the contract. (Author)

  2. A Delphi Approach to the Preparation of Early-Career Agricultural Educators in the Curriculum Area of Agricultural Mechanics: Fully Qualified and Highly Motivated or Status Quo?

    Science.gov (United States)

    Saucier, P. Ryan; McKim, Billy R.; Tummons, John D.

    2012-01-01

    According to the National Research Agenda for Agricultural Education and Communication, preservice agriculture teacher education programs should "prepare and provide an abundance of fully qualified and highly motivated agricultural educators at all levels" (Osborne, 2007, 8). The lack of preparation of entry career agricultural educators…

  3. Renewable energy systems in Mexico: Installation of a hybrid system

    Science.gov (United States)

    Pate, Ronald C.

    1993-05-01

    Sandia has been providing technical leadership on behalf of DOE and CORECT on a working level cooperative program with Mexico on renewable energy (PROCER). As part of this effort, the Sandia Design Assistance Center (DAC) and the solar energy program staff at Instituto de Investigaciones Electricas (IIE) in Cuernavaca, Mexico, recently reached agreement on a framework for mutually beneficial technical collaboration on the monitoring and field evaluation of renewable energy systems in Mexico, particularly village-scale hybrid systems. This trip was made for the purpose of planning the details for the joint installation of a data acquisition system (DAS) on a recently completed PV/Wind/Diesel hybrid system in the village of Xcalac on the Southeast coast of the state of Quintana Roo, Mexico. The DAS installation will be made during the week of March 15, 1993. While in Mexico, discussions were also held with personnel from.the National Autonomous University of Mexico (UNAM) Solar Energy Laboratory and several private sector companies with regard to renewable energy project activities and technical and educational support needs in Mexico.

  4. ISS qualified thermal carrier equipment

    Science.gov (United States)

    Deuser, Mark S.; Vellinger, John C.; Jennings, Wm. M.

    2000-01-01

    Biotechnology is undergoing a period of rapid and sustained growth, a trend which is expected to continue as the general population ages and as new medical treatments and products are conceived. As pharmaceutical and biomedical companies continue to search for improved methods of production and, for answers to basic research questions, they will seek out new avenues of research. Space processing on the International Space Station (ISS) offers such an opportunity! Space is rapidly becoming an industrial laboratory for biotechnology research and processing. Space bioprocessing offers exciting possibilities for developing new pharmaceuticals and medical treatments, which can be used to benefit mankind on Earth. It also represents a new economic frontier for the private sector. For over eight years, the thermal carrier development team at SHOT has been working with government and commercial sector scientists who are conducting microgravity experiments that require thermal control. SHOT realized several years ago that the hardware currently being used for microgravity thermal control was becoming obsolete. It is likely that the government, academic, and industrial bioscience community members could utilize SHOT's hardware as a replacement to their current microgravity thermal carrier equipment. Moreover, SHOT is aware of several international scientists interested in utilizing our space qualified thermal carrier. SHOT's economic financing concept could be extremely beneficial to the international participant, while providing a source of geographic return for their particular region. Beginning in 2000, flight qualified thermal carriers are expected to be available to both the private and government sectors. .

  5. Doctors qualifying from United Kingdom medical schools during the calendar years 1977 and 1983.

    Science.gov (United States)

    Parkhouse, J; Parkhouse, H F

    1989-01-01

    At the conclusion of undergraduate medical education in the United Kingdom most students pass a university qualifying examination and obtain a degree in medicine and surgery. Some students pass an external non-university qualifying examination in medicine as an alternative to obtaining a degree, and some do both. The degree may be obtained in the same year as the non-university qualifying examination, or in a different year. Some students from a medical school intake qualify in a later year than expected, for various reasons. Data from university, Health Department and other sources may relate to the academic year, the calendar year, or a fixed date such as 30 September. It is not a simple exercise, therefore, to define the exact number of people who qualify to practise medicine, for the first time, in any given 'year'. In counting qualifiers from individual medical schools, the problems are further compounded by the movement of students between the preclinical and clinical stages of the course, particularly from Oxford and Cambridge to London teaching hospitals. This paper analyses the situation for the calendar years 1977 and 1983, showing a decline in the number of students obtaining double (i.e. both university and non-university) qualifications. The number of UK graduates not registering with the General Medical Council to practise, at least for a time, in the UK was small, and the population base compiled for Medical Career Research Group studies was reasonably accurate in each of the 2 years examined.

  6. Qualified Entity Program

    Data.gov (United States)

    U.S. Department of Health & Human Services — Section 10332 of the Affordable Care Act amends section 1874 of the Social Security Act (the Act) by adding a new subsection (e) requiring standardized extracts of...

  7. Perry Nuclear Power Plant Area/Equipment Temperature Monitoring Program

    International Nuclear Information System (INIS)

    McGuire, L.L.

    1991-01-01

    The Perry Nuclear Power Plant Area/Equipment Temperature Monitoring Program serves two purposes. The first is to track temperature trends during normal plant operation in areas where suspected deviations from established environmental profiles exist. This includes the use of Resistance Temperature Detectors, Recorders, and Temperature Dots for evaluation of equipment qualified life for comparison with tested parameters and the established Environmental Design Profile. It also may be used to determine the location and duration of steam leaks for effect on equipment qualified life. The second purpose of this program is to aid HVAC design engineers in determining the source of heat outside anticipated design parameters. Resistance Temperature Detectors, Recorders, and Temperature Dots are also used for this application but the results may include design changes to eliminate the excess heat or provide qualified equipment (cable) to withstand the elevated temperature, splitting of environmental zones to capture accurate temperature parameters, or continued environmental monitoring for evaluation of equipment located in hot spots

  8. Military Installation Public-to-Public Partnerships: Lessons from Past and Current Experiences

    Science.gov (United States)

    2016-01-01

    delinquent taxes (29 percent), and programs for the elderly (27 percent). DoD installations have mental health, training, and child and youth programs, of...educational outreach and training of both organizations regarding the dynamics of domestic violence. The shelters also report statistics on domestic...Rubin, “Foundations of Library and Information Science,” New York: Neal Schumann, 2004, pp. 297–98, cited in Elizabeth Nelson, “Library Statistics and

  9. Nuclear Plant Analyzer: Installation manual. Volume 1

    International Nuclear Information System (INIS)

    Snider, D.M.; Wagner, K.L.; Grush, W.H.; Jones, K.R.

    1995-01-01

    This report contains the installation instructions for the Nuclear Plant Analyzer (NPA) System. The NPA System consists of the Computer Visual System (CVS) program, the NPA libraries, the associated utility programs. The NPA was developed at the Idaho National Engineering Laboratory under the sponsorship of the US Nuclear Regulatory Commission to provide a highly flexible graphical user interface for displaying the results of these analysis codes. The NPA also provides the user with a convenient means of interactively controlling the host program through user-defined pop-up menus. The NPA was designed to serve primarily as an analysis tool. After a brief introduction to the Computer Visual System and the NPA, an analyst can quickly create a simple picture or set of pictures to aide in the study of a particular phenomenon. These pictures can range from simple collections of square boxes and straight lines to complex representations of emergency response information displays

  10. Installation and sampling of vadose zone monitoring devices

    International Nuclear Information System (INIS)

    Bergeron, S.M.; Strickland, D.J.; Pearson, R.

    1987-10-01

    A vadose zone monitoring system was installed in a sanitary landfill near the Y-12 facility on the Department of Energy's Oak Ridge, Tennessee Reservation. The work was completed as part of the LLWDDD program to develop, design, and demonstrate new low level radioactive waste disposal monitoring methods. The objective of the project was to evaluate the performance of three types of vadose zone samplers within a similar hydrogeologic environment for use as early detection monitoring devices. The three different types of samplers included the Soil Moisture Equipment Corporation Pressure-Vacuum samplers (Models 1920 and 1940), and the BAT Piezometer (Model MK II) manufactured by BAT Envitech, Inc. All three samplers are designed to remove soil moisture from the vadose (unsaturated) zone. Five clusters of three holes each were drilled to maximum depths of 45 ft around part of the periphery of the landfill. Three samplers, one of each type, were installed at each cluster location. Water samples were obtained from 13 of the 15 samplers and submitted to Martin Marietta for analysis. All three samplers performed satisfactorily when considering ease of installation, required in-hole development, and ability to collect water samples from the vadose zone. Advantages and disadvantages of each sampler type are discussed in the main report

  11. Regulation for installation and operation of marine reactors

    International Nuclear Information System (INIS)

    1979-01-01

    The regulation is defined under the law for the regulations of nuclear source materials, nuclear fuel materials and reactors and the provisions of the order for execution of the law. The regulation is applied to marine reactors and reactors installed in foreign nuclear ships. Basic concepts and terms are explained, such as: radioactive waste; fuel assembly; exposure dose; accumulative dose; controlled area; safeguarded area; inspected surrounding area and employee. The application for permission of installation of reactors shall list maximum continuous thermal power, location and general structure of reactor facilities, structure and equipment of reactors and treatment and storage facilities of nuclear fuel materials, etc. The application for permission of reactors installed in foreign ships shall describe specified matters according to the provisions for domestic reactors. The operation program of reactors for three years shall be filed to the Minister of Transportation for each reactor every fiscal year from that year when the operation is expected to start. Records shall be made for each reactor and kept for particular periods on inspection of reactor facilities, operation, fuel assembly, control of radiation, maintenance and others. Exposure doses, inspection and check up of reactor facilities, operation of reactors, transport and storage of nuclear fuel materials, etc. are designated in detail. (Okada, K.)

  12. 26 CFR 1.1293-1 - Current taxation of income from qualified electing funds.

    Science.gov (United States)

    2010-04-01

    ... 26 Internal Revenue 11 2010-04-01 2010-04-01 true Current taxation of income from qualified electing funds. 1.1293-1 Section 1.1293-1 Internal Revenue INTERNAL REVENUE SERVICE, DEPARTMENT OF THE... Losses § 1.1293-1 Current taxation of income from qualified electing funds. (a) In general. [Reserved] (1...

  13. Engineering study - installation of new risers in Single-Shell Tanks

    International Nuclear Information System (INIS)

    Magruder, W.J.

    1994-08-01

    A sampling program is being developed to characterize the 149 underground SSTs on the Hanford Site. The sampling effort will require access to the tank interior in a minimum of two locations per tank. Some of the risers suitable for sampling are either unavailable or are not in locations for proper characterization of the tank contents. Additional risers will be required in the SSTs to support the tank characterization sampling program. The purpose of this engineering study is to review alternatives for installation of new riser in the SSTs

  14. Empowering African scientists - an investigation into a CD-based installer for scubuntu

    CSIR Research Space (South Africa)

    Van Zyl, P

    2008-11-01

    Full Text Available . The refinement of these profiles and package collections is an ongoing activity that will be driven by the scubuntu user community. Investigative work was undertaken to determine the suitability of a CD-based installation program for scubuntu. An experimental...

  15. 50 CFR 660.337 - Trawl rationalization program - data collection requirements.

    Science.gov (United States)

    2010-10-01

    ... 50 Wildlife and Fisheries 9 2010-10-01 2010-10-01 false Trawl rationalization program - data... COAST STATES West Coast Groundfish Fisheries § 660.337 Trawl rationalization program - data collection... guarantee that they will qualify for quota share under a future trawl rationalization program. The following...

  16. Groundwater quality monitoring well installation for Waste Area Grouping 4 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    Mortimore, J.A.

    1994-09-01

    This report documents the drilling and installation of 15 groundwater quality monitoring (GQM) wells on the perimeter of Waste Area Grouping (WAG) 4. WAG 4 is comprised of about 27 acres located in Melton Valley approximately 2700 ft southwest of the Oak Ridge National Laboratory main plant. It contains three inactive solid waste management units: (1) the abandoned intermediate level liquid waste transfer line located along the WAG's northwestern boundary, (2) the experimental pilot pit area, and (3) SWSA 4, the largest unit in the WAG. The wells at WAG 4 were drilled and developed between September 1987 and October 1990. These wells were installed to characterize and assess the WAG in accordance with applicable Department of Energy (DOE), state, and Environmental Protection Agency regulatory requirements. The wells at WAG 4 were drilled with auger or air rotary rigs. Depending on the hydrogeologic conditions present at each proposed well location, one of four basic installation methods was utilized. The purpose of the well installation program was to install GQM wells for groundwater characterization at WAG 4. Data packages produced during installation activities by the ERCE hydrogeologists are an important product of the program. These packages document the well drilling, installation, and development activities and provide valuable data for well sampling and WAG characterization. The forms contained in the packages include predrilling and postdrilling checklists, drilling and construction logs, development and hydraulic conductivity records, and quality control-related documents

  17. Progress in qualifying low-enriched U-Mo dispersion fuels

    International Nuclear Information System (INIS)

    Snelgrove, J.L.; Hofman, G.L.; Hayes, S.L.; Meyer, M.K.

    2001-01-01

    The U.S. Reduced Enrichment for Research and Test Reactors program is working to qualify dispersions of U-Mo alloys in aluminum with fuel-meat densities of 8 to 9 gU cm -3 . Post irradiation examinations of the small fuel plates irradiated in the Advanced Test Reactor during the high-temperature RERTR-3 tests are virtually complete, and analysis of the large quantity of data obtained is underway. We have observed that the swelling of the fuel plates is stable and modest and that the swelling is dominated by the temperature-dependent interaction of the U-Mo fuel and the aluminum matrix. In order to extract detailed information about the behavior of these fuels from the data, a complex fuel-plate thermal model is being developed to account for the effects of the changing fission rate and thermal conductivity of the fuel meat during irradiation. This paper summarizes the empirical results of the post irradiation examinations and the preliminary results of the model development. In addition, the schedule for irradiation of full-sized elements in the HFR-Petten is briefly discussed. (author)

  18. Predictors of Self-Directed Learning for Low-Qualified Employees: A Multi-Level Analysis

    Science.gov (United States)

    Raemdonck, Isabel; van der Leeden, Rien; Valcke, Martin; Segers, Mien; Thijssen, Jo

    2012-01-01

    Purpose: This study aims to examine which variables at the level of the individual employee and at the company level are predictors of self-directed learning in low-qualified employees. Methodology: Results were obtained from a sample of 408 low-qualified employees from 35 different companies. The companies were selected from the energy sector,…

  19. 30 CFR 57.4504 - Fan installations.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Fan installations. 57.4504 Section 57.4504... Control Installation/construction/maintenance § 57.4504 Fan installations. (a) Fan houses, fan bulkheads... of combustible materials, except installed wiring, ground and track support, headframes, and direct...

  20. Installation of PMV Operation Program in DDC Controller and Air Conditioning Control Using PMV Directly as Set Point

    Science.gov (United States)

    Haramoto, Ken-Ichi

    In general, air conditioning control in a building is operated mainly by indoor air temperature control. Although the operators of the machine in the building accepted a claim for indoor air temperature presented by the building inhabitants, the indoor conditions have been often too cool or warm. Therefore, in an attempt to create better thermal environments, the author paid attention to the PMV that is a thermal comfort index. And then, the possibility of air conditioning control using the PMV directly as the set point was verified by employing actual equipment in an air conditioning testing room and an office building. Prior to the execution of this control, the operation program of the PMV was installed in a DDC controller for the air conditioning control. And information from indoor sensors and so on was inputted to the controller, and the computed PMV was used as the feedback variable.

  1. 30 CFR 77.107-1 - Plans for training programs.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Plans for training programs. 77.107-1 Section... COAL MINES Qualified and Certified Persons § 77.107-1 Plans for training programs. Each operator must..., a program or plan setting forth what, when, how, and where the operator will train and retrain...

  2. Attempting to Predict Success in the Qualifying Round of the International Chemistry Olympiad

    Science.gov (United States)

    Urhahne, Detlef; Ho, Lok Hang; Parchmann, Ilka; Nick, Sabine

    2012-01-01

    The aim of this study was trying to predict success in the qualifying round for the International Chemistry Olympiad (IChO) on the basis of the expectancy-value model of achievement motivation by Eccles et al. The investigation with 52 participants, including 14 females, was conducted during the third of four qualifying rounds of the IChO in…

  3. 3D Projection Installations

    DEFF Research Database (Denmark)

    Halskov, Kim; Johansen, Stine Liv; Bach Mikkelsen, Michelle

    2014-01-01

    Three-dimensional projection installations are particular kinds of augmented spaces in which a digital 3-D model is projected onto a physical three-dimensional object, thereby fusing the digital content and the physical object. Based on interaction design research and media studies, this article ...... Fingerplan to Loop City, is a 3-D projection installation presenting the history and future of city planning for the Copenhagen area in Denmark. The installation was presented as part of the 12th Architecture Biennale in Venice in 2010....

  4. Dietary habits of obese patients qualified for bariatric procedures.

    Science.gov (United States)

    Jastrzebska-Mierzyńska, Marta; Ostrowska, Lucyna; Hady, Hady Razak; Dadan, Jacek

    2014-01-01

    Patients with obesity, including morbid obesity, commit numerous dietary mistakes. They prefer high-energy diets, but of poor nutritional value. Patients qualified for bariatric procedures show deficiencies in vitamins and minerals due to insufficient intake of vegetables, fruit and whole grain products. Analysis of dietary habits in morbidly obese patients prepared for bariatric surgery, including assessment of eating style and frequency of consumption of certain products. The study group contained 39 people aged 18 - 65 years, who were surveyed with a questionnaire elaborated in the Department of Clinical Dietetics and Nutrition, Medical University of Bialystok. The following factors were assessed: number of meals, snacking between meals and eating at night, types of snacks eaten, and frequency of consumption of certain foods. Results were analyzed using Statistica 9.0. The majority of surveyed men (41.7%) ate three meals a day, whereas most women (40.7%) had at least 4 meals a day. Nearly 85% of the respondents admitted snacking between meals, mainly eating fruit, sweets and sandwiches. Whole grain cereal, milk and dairy products, fish, fruit, vegetables and pulses appeared in diet of patients qualified for treatment of obesity very rarely. Dietary habits of obese patients qualified for bariatric procedures are not consistent with recommendations. Therefore, these patients should receive nutritional education in order to foster proper eating habits that will help in the postoperative nutrition.

  5. FMCSA safety program effectiveness measurement : Roadside Intervention Effectiveness Model, fiscal year 2010 : [analysis brief].

    Science.gov (United States)

    2014-11-01

    Two of the Federal Motor Carrier Safety Administrations (FMCSAs) key safety programs are the Roadside Inspection and Traffic Enforcement programs. The Roadside Inspection program consists of roadside inspections performed by qualified safety in...

  6. 26 CFR 1.221-1 - Deduction for interest paid on qualified education loans after December 31, 2001.

    Science.gov (United States)

    2010-04-01

    ... Individuals § 1.221-1 Deduction for interest paid on qualified education loans after December 31, 2001. (a) In... interest paid by the taxpayer during the taxable year on a qualified education loan. See paragraph (b)(4... paid on qualified education loans after December 31, 2001, in taxable years ending after December 31...

  7. Modelling the effects of U.S. ENERGY STARR appliance programs

    International Nuclear Information System (INIS)

    Feldman, Shel; Hoefgen, Lynn; Wilson-Wright, Lisa; Li, Angela

    2005-01-01

    Numerous U.S. utilities and market transformation organizations have invested heavily in the ENERGY STAR program, designed to increase market penetration of energy-efficient products (e.g., home appliances, lighting products, windows). Major activities involve stimulating production and promotion of qualifying models, as well as stocking, sales support and financial incentives to customers-all of which entail considerable investments of public funds. Several studies have shown that customer awareness of ENERGY STAR has increased across the country, particularly where energy-efficiency programs have been most active. Furthermore, studies in regions with aggressive programs have shown that the market penetration of qualifying products has increased rapidly. Until recently, however, policy makers have lacked reliable studies that compare changes in market penetration across regions with and without programs while factoring out effects of demographic and other background factors (e.g., education, income, and climate). Also lacking have been attempts to assess whether heavy promotion of the ENERGY STAR brand with some appliances (e.g., clothes washers) has affected the market penetration of less-promoted qualifying appliances. In this paper, the authors address these issues, using a database of the market penetration of four major home appliances at national retailers in each of the individual states over a multi-year period, based on multivariate statistical models. Results include both analyses of the overall trend of market penetration (1998-2002) for the appliances considered and the incremental effects of the 2003 program. The results lead to recommendations regarding the design of programs supporting ENERGY STAR compliant appliances and the key components of those programs

  8. Creating Highly Qualified Teachers: Maximizing University Resources to Provide Professional Development in Rural Areas

    Science.gov (United States)

    Mollenkopf, Dawn L.

    2009-01-01

    The "highly qualified teacher" requirement of No Child Left Behind has put pressure on rural school districts to recruit and retain highly qualified regular and special education teachers. If necessary, they may utilize uncertified, rural teachers with provisional certification; however, these teachers may find completing the necessary…

  9. Validation of mentorship model for newly qualified professional ...

    African Journals Online (AJOL)

    Newly qualified professional nurses (NQPNs) allocated to community health care services require the use of validated model to practice independently. Validation was done to adapt and assess if the model is understood and could be implemented by NQPNs and mentors employed in community health care services.

  10. Fabrication and installation of the DIII-D radiative divertor structures

    International Nuclear Information System (INIS)

    Hollerbach, M.A.; Smith, J.P.

    1997-11-01

    Phase 1A of the Radiative Divertor Program (RDP) is now installed in the DIII-D tokamak located at General Atomics. This hardware was added to enhance both the Divertor and Advanced Tokamak research elements of the DIII-D program. This installation consists of a divertor baffle enveloping a cryocondensation pump at the upper outer divertor target of DIII-D. The divertor baffle consists of two toroidally continuous Inconel 625 water-cooled rings and a toroidal array of discontinuous radiatively-cooled plates. The water-cooled rings are each comprised of four quadrants, mechanically formed, chem.-milled, and resistance and TIG welded Inconel 625 panels. The supports attaching the panels to the vessel wall are designed to accommodate the differential thermal expansion between the rings and vessel during bake and to react the electromagnetic loads induced during disruptions. They are made from either Inconel 625 or Inconel 718 depending on the stress levels predicted in Finite Element Analysis. Gas seals are designed to limit the leakage from the baffle chamber back to the core plasma to 2,500 ell/s and incorporate plasma sprayed alumina to minimize currents flowing through them. The bulk of the water-cooled ring fabrication was performed by a vendor, however, the final machining of penetrations in the conical ring for diagnostic access was performed in-house using a unique machining configuration. This configuration, and the machining of the diagnostic cutouts is described. Graphite tiles were machined from ATJ graphite to form a smooth plasma-facing surface. The installation of all divertor components required only four weeks

  11. Simulation used to qualify nuclear waste glass for disposal

    International Nuclear Information System (INIS)

    Reimus, T.W.; Kuhn, W.L.

    1987-07-01

    A hypothetical vitrification system was simulated errors associated with controlling and predicting the composition of the nuclear waste glass produced in the system. The composition of the glass must fall within certain limits to qualify for permanent geologic disposal. The estimated error in predicting the concentrations of various constituents in the glass was 2% to 8%, depending on the strategy for sampling and analyzing the feed and on the assumed magnitudes of the process uncertainties. The estimated error in controlling the glass composition was 2% to 9%, depending on the strategy for sampling and analyzing the waste and on the assumed magnitudes of the uncertainties. This work demonstrates that simulation techniques can be used to assist in qualifying nuclear waste glass for disposal. 3 refs., 2 figs., 4 tabs

  12. 12 CFR 617.7125 - How should a qualified lender determine the effective interest rate?

    Science.gov (United States)

    2010-01-01

    ... effective interest rate? 617.7125 Section 617.7125 Banks and Banking FARM CREDIT ADMINISTRATION FARM CREDIT SYSTEM BORROWER RIGHTS Disclosure of Effective Interest Rates § 617.7125 How should a qualified lender determine the effective interest rate? (a) A qualified lender must calculate the effective interest rate on...

  13. 12 CFR 574.8 - Qualified stock issuances by undercapitalized savings associations or holding companies.

    Science.gov (United States)

    2010-01-01

    ... voting stock of the issuing undercapitalized savings association or savings and loan holding company. (8... 12 Banks and Banking 5 2010-01-01 2010-01-01 false Qualified stock issuances by undercapitalized... SUPERVISION, DEPARTMENT OF THE TREASURY ACQUISITION OF CONTROL OF SAVINGS ASSOCIATIONS § 574.8 Qualified stock...

  14. SIS: an accelerator installation for heavy ions of high energy

    International Nuclear Information System (INIS)

    The two major sections of the report cover the scientific experimental program and the accelerator installation. Topics covered in the first include: heavy ion physics in the medium energy region; nuclear physics at relativistic energies; atomic physics loss and capture cross sections for electrons; spectroscopy of few-electron systems; atomic collision processes; biological experiments; nuclear track techniques in biology; and experiments with protons and secondary radiation. The second includes: concept for the total installation; technical description of the SIS 12; technical description of the SIS 100; status of the UNILAC injector; development options for the SIS installations; properties of the heavy ion beam; and structural work and technical supply provisions. In this SIS project proposal, an accelerator installation based on two synchrotrons is described with which atomic nuclei up to uranium can be accelerated to energies of more than 10 GeV/μ. With the SIS 12, which is the name of the first stage, heavy ion physics at intermediate energies can be pursued up to 500 MeV/μ. The second stage, a larger synchrotron, the SIS 100, has a diameter of 250 m. With this device, it is proposed to open up the domain of relativistic heavy ion physics up to 14 GeV/μ (for intermediate mass particles) and 10 GeV/μ (for uranium)

  15. Formal on-the-job training programs at power generating stations

    Energy Technology Data Exchange (ETDEWEB)

    Hoch, R.R. [HGS, Inc., Ellicott City, MD (United States)

    1996-11-01

    On-the-Job Training (OJT) should be utilized for all posts in the stations. OJT for entry level positions should include training in many mundane areas that are often overlooked such as record keeping (log sheets and log books), proper communications and how to conduct himself or herself on the watch, during either emergency or routine situations. A separate OJT Program should be provided to prepare personnel to qualify for promotion to the next level. (Depending on any common agreements or bargaining unit contracts, OJT Programs can also be used to pre-qualify candidates for promotion to the next level.) By allowing the trainee to retain all OJT Program materials, it will also be available to him or her for continued reference or remedial training. (When an OJT Program is first instituted, it may be validated by issuing it to incumbent personnel and, subsequent, incorporating their comments or corrections.) This paper describes a formal OJT program.

  16. Exploring selection and recruitment processes for newly qualified nurses: a sequential-explanatory mixed-method study.

    Science.gov (United States)

    Newton, Paul; Chandler, Val; Morris-Thomson, Trish; Sayer, Jane; Burke, Linda

    2015-01-01

    To map current selection and recruitment processes for newly qualified nurses and to explore the advantages and limitations of current selection and recruitment processes. The need to improve current selection and recruitment practices for newly qualified nurses is highlighted in health policy internationally. A cross-sectional, sequential-explanatory mixed-method design with 4 components: (1) Literature review of selection and recruitment of newly qualified nurses; and (2) Literature review of a public sector professions' selection and recruitment processes; (3) Survey mapping existing selection and recruitment processes for newly qualified nurses; and (4) Qualitative study about recruiters' selection and recruitment processes. Literature searches on the selection and recruitment of newly qualified candidates in teaching and nursing (2005-2013) were conducted. Cross-sectional, mixed-method data were collected from thirty-one (n = 31) individuals in health providers in London who had responsibility for the selection and recruitment of newly qualified nurses using a survey instrument. Of these providers who took part, six (n = 6) purposively selected to be interviewed qualitatively. Issues of supply and demand in the workforce, rather than selection and recruitment tools, predominated in the literature reviews. Examples of tools to measure values, attitudes and skills were found in the nursing literature. The mapping exercise found that providers used many selection and recruitment tools, some providers combined tools to streamline process and assure quality of candidates. Most providers had processes which addressed the issue of quality in the selection and recruitment of newly qualified nurses. The 'assessment centre model', which providers were adopting, allowed for multiple levels of assessment and streamlined recruitment. There is a need to validate the efficacy of the selection tools. © 2014 John Wiley & Sons Ltd.

  17. 75 FR 16821 - Housing Finance Agency Risk-Sharing Program

    Science.gov (United States)

    2010-04-02

    ...The proposed information collection requirement described below has been submitted to the Office of Management and Budget (OMB) for review, as required by the Paperwork Reduction Act. The Department is soliciting public comments on the subject proposal. Section 542(c) of the Risk Sharing Program authorizes qualified Housing Finance Agencies (HFAs) to underwrite and process loans. HUD provides full mortgage insurance on affordable multifamily housing project processed by HFAs under this program. Qualified HFAs are vested with the maximum amount of processing responsibilities. By entering into Risk-Sharing Agreement with HUD, HFAs contract to reimburse HUD for a portion of the loss from any defaults that occur while HUD insurance is in force.

  18. 42 CFR 416.26 - Qualifying for an agreement.

    Science.gov (United States)

    2010-10-01

    ..., where State law requires licensure, the ASC complies with State licensure requirements; and (3) The ASC.... (c) Acceptance of the ASC as qualified to furnish ambulatory surgical services. If CMS determines... its authorized representative; and (2) File them with CMS. (e) Acceptance by CMS. If CMS accepts the...

  19. 26 CFR 1.465-27 - Qualified nonrecourse financing.

    Science.gov (United States)

    2010-04-01

    ... partnership; incidental property. (i) X is a limited liability company that is classified as a partnership for.... (i) UTP1 and UTP2, both limited liability companies classified as partnerships, are the only general... as qualified nonrecourse financing. (4) Partnership liability. For purposes of section 465(b)(6) and...

  20. 30 CFR 75.153 - Electrical work; qualified person.

    Science.gov (United States)

    2010-07-01

    ... Mine Safety and Health Districts at regular intervals, or as demand requires. (d) A score of at least... Section 75.153 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR COAL MINE SAFETY AND HEALTH MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Qualified and Certified Persons § 75...

  1. 26 CFR 1.414(r)-1 - Requirements applicable to qualified separate lines of business.

    Science.gov (United States)

    2010-04-01

    ... lines of business. 1.414(r)-1 Section 1.414(r)-1 Internal Revenue INTERNAL REVENUE SERVICE, DEPARTMENT... Plans, Etc. § 1.414(r)-1 Requirements applicable to qualified separate lines of business. (a) In general. Section 414(r) prescribes the conditions under which an employer is treated as operating qualified...

  2. 34 CFR 643.1 - What is the Talent Search program?

    Science.gov (United States)

    2010-07-01

    ... 34 Education 3 2010-07-01 2010-07-01 false What is the Talent Search program? 643.1 Section 643.1... EDUCATION, DEPARTMENT OF EDUCATION TALENT SEARCH General § 643.1 What is the Talent Search program? The Talent Search program provides grants for projects designed to— (a) Identify qualified youths with...

  3. Installation and commissioning of instantaneous dose rate monitoring system

    CERN Document Server

    Iaydjiev, Plamen

    2018-01-01

    INRNE-Sofia was working on the installation and commissioning of new instantaneous dose rate monitoring system for the GIF++ facility at CERN. The final device, containing an 8-channels readout board was designed and tested at the CERN facility during November 2017, in an irradiation campaign supported by the AIDA-2020 TA program. The system is designed to be fully integrated in the GIF++ control system and the data measured are available to the users.

  4. FMCSA safety program effectiveness measurement : Roadside Intervention Effectiveness Model FY 2012, [analysis brief].

    Science.gov (United States)

    2016-02-01

    Roadside Inspection and Traffic Enforcement are two of : the Federal Motor Carrier Safety Administrations : (FMCSAs) key safety programs. The Roadside : Inspection Program consists of roadside inspections : performed by qualified safety inspect...

  5. Monitoring well installation plan for the Department of Energy Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1997-09-01

    The installation and development of groundwater monitoring wells is a primary element of the Y-12 Plant Groundwater Protection Program (GWPP), which monitors groundwater quality and hydrologic conditions at the Oak Ridge Y-12 Plant. This document is a groundwater monitoring well installation and development plan for the US Department of Energy (DOE) Y-12 Plant located in Oak Ridge, Tennessee. This plan formalizes well installation and construction methods, well development methods, and core drilling methods that are currently implemented at the Y-12 Plant under the auspices of the GWPP. Every three years, this plan will undergo a review, during which revisions necessitated by changes in regulatory requirements or GWPP objectives may be made

  6. The impact of a Role Emerging Placement while a student occupational therapist, on subsequent qualified employability, practice and career path.

    Science.gov (United States)

    Thew, Miranda; Thomas, Yvonne; Briggs, Michelle

    2018-03-11

    Although Role Emerging Placements (REP) are now a common feature in pre-registration occupational therapy curricula, there is a need to expand the understanding of the impact of this experience on employability, practice and career path of qualified occupational therapists. A case finding online survey was used to create a purposive sample for Thematic Analysis of semi-structured interviews with practising occupational therapists from one UK Masters' level pre-registration occupational therapy program. The case finding survey (n = 19) led to recruitment of six participants to be interviewed. The qualitative findings reflected the impact of a REP experience on occupational therapists' employability, practice and career path. The complementary features of the more traditional placement and the role emergent type of placement were considered as being useful and beneficial to qualified practice regardless of setting. However, the REP additionally, had an internal and outward impact. Internally, the therapist gains a passion for occupation-focussed practice and builds confidence to promote both self and the profession. Outwardly, the therapist can offer extra skills in qualified practice, particularly in innovative service development and delivery, thereby offering added value for employability. A REP experience as an occupational therapy student, can develop additional skills for qualified professional practice than traditional practice placements alone. The impact of such a placement matches with the 'Generation Y' traits of young adults who are now starting to emerge into training and the work place, translates well into a variety of working environments and lasts into career development. The placement model of occupation-focussed project development and the less apprentice style learning of a REP may be influential, and could be a suitable model within traditional placements. © 2018 Occupational Therapy Australia.

  7. Installation of the LHC experimental insertions

    CERN Document Server

    Bartolome-Jimenez, S

    2004-01-01

    The installation of the LHC experimental insertions, and particularly the installation of the low-beta quadrupoles, raises many technical challenges due to the stringent alignment specifications and to the difficulty of access in very confined areas. The compact layout with many lattice elements, vacuum components, beam control instrumentation and the presence of shielding does not allow for any improvisation in the installation procedure. This paper reviews all the constraints that need to be taken into account when installing the experimental insertions. It describes the chronological sequence of installation and discusses the technical solutions that have been adopted.

  8. INSTALLATION OF THE LHC EXPERIMENTAL INSERTIONS

    CERN Document Server

    Bartolome-Jimenez, S

    2004-01-01

    The installation of the LHC experimental insertions, and particularly the installation of the Low-Beta quadrupoles, raises many technical challenges due to the stringent alignment specifications and to the difficulty of access in very confined areas. The compact layout with many lattice elements, vacuum components, beam control instrumentation and the presence of shielding does not allow for any improvisation in the installation procedure. This paper reviews all the constraints that need to be taken into account when installing the experimental insertions. It describes the chronological sequence of installation and discusses the technical solutions that have been adopted.

  9. Results of 200 KW fuel cell evaluation programs

    Energy Technology Data Exchange (ETDEWEB)

    Torrey, J.M.; Merten, G.P. [SAIC, San Diego, CA (United States); Binder, M.J. [Army Construction Engineering Research Labs., Champaign, IL (United States)] [and others

    1996-12-31

    Science Applications International Corporation (SAIC) has installed six monitoring systems on ONSI Corporation 200 kW phosphoric acid fuel cells. Three of the systems were installed for the U.S. Army Construction Engineering Research Laboratories (USACERL) which is coordinating the Department of Defense (DoD) fuel cell Demonstration Program and three were installed under a contract with the New York State Energy Research and Development Authority (NYSERDA). Monitoring of the three NYSERDA sites has been completed. Monitoring systems for the DoD fuel cells were installed in August, 1996 and thus no operating data was available at the time of this writing, but will be presented at the Fuel Cell Seminar. This paper will present the monitoring configuration and research approach for each program. Additionally, summary performance data is presented for the completed NYSERDA program.

  10. 36 CFR 908.13 - Rights of Qualified Persons.

    Science.gov (United States)

    2010-07-01

    ... POLICY AND PROCEDURES TO FACILITATE THE RETENTION OF DISPLACED BUSINESSES AND RESIDENTS IN THE... leasing plan which are, in the Corporation's opinion, major. (c) Each Qualified Person on the List, who is... opportunity to occupy Newly Developed Space shall not be limited to the square on which its previous location...

  11. 22 CFR 19.6-2 - Qualifying court order.

    Science.gov (United States)

    2010-04-01

    ... principal's Foreign Service retirement benefit or survivor benefit. If a court directs or implies that a... Foreign Relations DEPARTMENT OF STATE PERSONNEL BENEFITS FOR SPOUSES AND FORMER SPOUSES OF PARTICIPANTS IN... the Secretary of State. A qualifying court order must— (1) Be consistent with the terms of the Act and...

  12. 26 CFR 54.4980B-3 - Qualified beneficiaries.

    Science.gov (United States)

    2010-04-01

    ... the day before the qualifying event (that is, the divorce or death) will have been by reason of D's... event, and the reason for the individual's lack of actual coverage (such as the individual's having..., the individual is covered under the group health plan by reason of another individual's election of...

  13. Fatigue damage of nuclear facilities; Endommagement par fatigue des installations nucleaires

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-07-01

    The conference on the fatigue damage of nuclear facilities, organized by the SFEN (french society of nuclear energy), took place at Paris the 23. of november 2000. Eleven papers were presented, showing the state of the art and the research programs in the domain of the sizing rules, safety, installations damage, examination and maintenance. (A.L.B.)

  14. Space Shuttle Program (SSP) Shock Test and Specification Experience for Reusable Flight Hardware Equipment

    Science.gov (United States)

    Larsen, Curtis E.

    2012-01-01

    As commercial companies are nearing a preliminary design review level of design maturity, several companies are identifying the process for qualifying their multi-use electrical and mechanical components for various shock environments, including pyrotechnic, mortar firing, and water impact. The experience in quantifying the environments consists primarily of recommendations from Military Standard-1540, Product Verification Requirement for Launch, Upper Stage, and Space Vehicles. Therefore, the NASA Engineering and Safety Center (NESC) formed a team of NASA shock experts to share the NASA experience with qualifying hardware for the Space Shuttle Program (SSP) and other applicable programs and projects. Several team teleconferences were held to discuss past experience and to share ideas of possible methods for qualifying components for multiple missions. This document contains the information compiled from the discussions

  15. Groundwater quality monitoring well installation for Upper Waste Areas Grouping 2 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    Mortimore, J.A.; Lee, T.A.

    1994-09-01

    This report documents the drilling and installation of seven groundwater quality monitoring (GQM) wells on the perimeter of Upper Waste Area Grouping (WAG) 2. Upper WAG 2 is composed of portions of White Oak Creek (WOC), Melton Branch, two of Melton Branch's tributaries, and the floodplains surrounding these water bodies. The WOC section of the subject site begins at the confluence of WOC and Melton Branch and extends 0.62 mile upstream to the 7,500 bridge. The Melton Branch portion of the site also begins at the confluence of WOC and Melton Branch and extends eastward 0.88 mile upstream. The wells at Upper WAG 2 were drilled and developed between December 1989 and October 1990. These wells were installed to characterize and assess the WAG in accordance with applicable Department of Energy, state, and Environmental Protection Agency regulatory requirements. The purpose of the well installation program was to install GQM wells for groundwater characterization at Upper WAG-2. Data packages produced during installation activities by the ERCE hydrogeologists are an important product of the program. These packages document the well drilling, installation, and development activities and provide valuable data for well sampling and WAG characterization. The forms contained in the packages include predrilling and postdrilling checklists, drilling and construction logs, development and hydraulic conductivity records, and quality control-related documents

  16. Student science enrichment training program

    Energy Technology Data Exchange (ETDEWEB)

    Sandhu, S.S.

    1994-08-01

    This is a report on the Student Science Enrichment Training Program, with special emphasis on chemical and computer science fields. The residential summer session was held at the campus of Claflin College, Orangeburg, SC, for six weeks during 1993 summer, to run concomitantly with the college`s summer school. Fifty participants selected for this program, included high school sophomores, juniors and seniors. The students came from rural South Carolina and adjoining states which, presently, have limited science and computer science facilities. The program focused on high ability minority students, with high potential for science engineering and mathematical careers. The major objective was to increase the pool of well qualified college entering minority students who would elect to go into science, engineering and mathematical careers. The Division of Natural Sciences and Mathematics and engineering at Claflin College received major benefits from this program as it helped them to expand the Departments of Chemistry, Engineering, Mathematics and Computer Science as a result of additional enrollment. It also established an expanded pool of well qualified minority science and mathematics graduates, which were recruited by the federal agencies and private corporations, visiting Claflin College Campus. Department of Energy`s relationship with Claflin College increased the public awareness of energy related job opportunities in the public and private sectors.

  17. FMCSA safety program effectiveness measurement : roadside intervention effectiveness model FY 2011 : [analysis brief].

    Science.gov (United States)

    2015-06-01

    Roadside Inspection and Traffic Enforcement are two of the Federal Motor Carrier Safety Administrations (FMCSAs) key safety programs. The Roadside Inspection program consists of roadside inspections performed by qualified safety inspectors. The...

  18. Displacement pile installation effects in sand

    NARCIS (Netherlands)

    Beijer-Lundberg, A.

    2015-01-01

    Installation effects govern the post-installation behaviour of displacement piles in sand. These effects are currently not completely understood. Suitable experimental techniques to model these installation effects include field, laboratory and experimental models. In the current thesis a

  19. 49 CFR 604.15 - Registration of qualified human service organizations.

    Science.gov (United States)

    2010-10-01

    ... low income, advanced age, or with disabilities), shall register on FTA's charter registration Web site... service organization and whether the qualified human service organization is exempt from taxation under...

  20. 77 FR 26175 - Section 42 Qualified Contract Provisions

    Science.gov (United States)

    2012-05-03

    ... indebtedness under general principles of Federal income tax law, and (3) upon the sale of the building, are... building for sale to the general public at the determined qualified contract price upon receipt of a... because of variations under State laws concerning the terms of a bona fide contract and methods for...

  1. 26 CFR 1.41-2 - Qualified research expenses.

    Science.gov (United States)

    2010-04-01

    ... Credits Against Tax § 1.41-2 Qualified research expenses. (a) Trade or business requirement—(1) In general... research and experimental expenses) are not necessarily paid or incurred in carrying on a trade or business for purposes of section 41. A research expense must relate to a particular trade or business being...

  2. IEEE Std 649-1991: IEEE standard for qualifying Class 1E motor control centers for nuclear power generating stations

    International Nuclear Information System (INIS)

    Anon.

    1993-01-01

    The basic principles, requirements, and methods for qualifying Class 1E motor control centers for both harsh and mild environment applications in nuclear power generating stations are described. In addition to defining specific qualification requirements for Class 1E motor control centers and their components in accordance with the more general qualification requirements of IEEE Std 323-1983, this standard is intended to provide guidance in establishing a qualification program for demonstrating the adequacy of Class 1E motor control centers in nuclear power generating station applications

  3. 78 FR 61987 - Corbett Water District; Notice of Preliminary Determination of a Qualifying Conduit Hydropower...

    Science.gov (United States)

    2013-10-09

    ... District; Notice of Preliminary Determination of a Qualifying Conduit Hydropower Facility and Soliciting... construct a qualifying conduit hydropower facility, pursuant to section 30 of the Federal Power Act, as amended by section 4 of the Hydropower Regulatory Efficiency Act of 2013 (HREA). The Corbett Hydroelectric...

  4. 26 CFR 1.414(r)-7 - Determination of the employees of an employer's qualified separate lines of business.

    Science.gov (United States)

    2010-04-01

    ... same department, or at the same location, to the same qualified separate line of business would be an... qualified separate lines of business. 1.414(r)-7 Section 1.414(r)-7 Internal Revenue INTERNAL REVENUE...-Sharing, Stock Bonus Plans, Etc. § 1.414(r)-7 Determination of the employees of an employer's qualified...

  5. New fast reactor installation concept

    International Nuclear Information System (INIS)

    Anon.

    1976-01-01

    The large size and complexity of fast reactor installations are emphasised and these difficulties will be increased with the advent of fast reactors of higher power. In this connection a new concept of fast reactor installation is described with a view to reducing the size of the installation and enabling most components, including even the primary vessel, to be constructed within the confines of a workshop. Full constructional details are given. (U.K.)

  6. Preliminary results of the national program of audit of quality in radiotherapy services in the Republic of Cuba

    International Nuclear Information System (INIS)

    Dominguez Hung, Lourdes; Larrinaga Cortina, Eduardo F.; Morales Lopez, Jorge L.; Garcia Yip, Fernando; Campa Menendez, Raudel

    2001-01-01

    The current state of the radiotherapy in Cuba has allowed to pass to a superior stage, the establishment of a National Quality Audit Program (PNAC). The National Control Center for Medical Devices as national regulator entity for the control and supervision of the medical devices of the National Health System is the responsible for it implementation. This paper presents the preliminary results of the execution of the PNAC in teletherapy services with isotopic units of 60 Co. The audits were carried out according to the methodology settled down in the normalized procedure of operation of the PNAC. The physical aspects related with the treatment were audit, such as: the installation and unit's security, treatment unit's mechanical and dosimetric aspects and organizational aspects of the institution quality assurance program. Also were carried out, in the clinical aspect, verifications of cases type planned by the qualified personnel of the service. The results corresponding to the determination of the reference dose for each institution were compared with those obtained in a postal audit with the International Atomic Energy Agency. These first audits allowed to evaluate the performance of the institution's program of quality assurance and a feedback for the setting about to the PNAC. (author)

  7. 77 FR 76941 - Defense Federal Acquisition Regulation Supplement: New Qualifying Country-Poland (DFARS Case 2012...

    Science.gov (United States)

    2012-12-31

    ... discriminatory barriers to procurements of supplies and services produced by industrial enterprises of the other....003 is amended in paragraph (10), the definition of ``qualifying country'' by adding in alphabetical... place; 0 b. In paragraph (a), the definition of ``qualifying country'', by adding, in alphabetical order...

  8. 78 FR 63176 - Notice of Preliminary Determination of a Qualifying Conduit Hydropower Facility and Soliciting...

    Science.gov (United States)

    2013-10-23

    ... Preliminary Determination of a Qualifying Conduit Hydropower Facility and Soliciting Comments and Motions To... of intent to construct a qualifying conduit hydropower facility, pursuant to section 30 of the Federal Power Act, as amended by section 4 of the Hydropower Regulatory Efficiency Act of 2013 (HREA). The...

  9. Analogy Mapping Development for Learning Programming

    Science.gov (United States)

    Sukamto, R. A.; Prabawa, H. W.; Kurniawati, S.

    2017-02-01

    Programming skill is an important skill for computer science students, whereas nowadays, there many computer science students are lack of skills and information technology knowledges in Indonesia. This is contrary with the implementation of the ASEAN Economic Community (AEC) since the end of 2015 which is the qualified worker needed. This study provided an effort for nailing programming skills by mapping program code to visual analogies as learning media. The developed media was based on state machine and compiler principle and was implemented in C programming language. The state of every basic condition in programming were successful determined as analogy visualization.

  10. Fiscal Year 1998 Well Installation, Plugging and Abandonment, and Redevelopment summary report Y-12 Plant, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    None

    1998-12-01

    This report summarizes the well installation, plugging and abandonment, and redevelopment activities conducted during the federal fiscal year (FY) 1998 at the Y-12 Plant, Oak Ridge, Tennessee. Five new groundwater monitoring wells were installed at the Y-12 Plant under the FY 1998 drilling program. Two of the wells are located in west Bear Creek Valley, one is in the eastern Y-12 Plant area near Lake Reality, and two are located near the Oil Landfarm Waste Management Area, which were installed by Bechtel Jacobs Company LLC (Bechtel Jacobs) as part of a site characterization activity for the Oak Ridge Reservation (ORR) Disposal Cell. Also, two existing wells were upgraded and nine temporary piezometers were installed to characterize hydrogeologic conditions at the Disposal Cell site. In addition, 40 temporary piezometers were installed in the Boneyard/Bumyard area of Bear Creek Valley by Bechtel Jacobs as part of the accelerated remedial actions conducted by the Environmental Restoration Program. Ten monitoring wells at the Y-12 Plant were decommissioned in FY 1998. Two existing monitoring wells were redeveloped during FY 1998 (of these, GW-732 was redeveloped tsvice). All well installation and development (including redevelopment) was conducted following industry-standard methods and approved procedures from the Environmental Surveillance Procedures Quality Control Program (Energy Systems 1988); the Resource Conservation and Recovery Act (RCRA) Groundwater Monitoring Technical Enforcement Guidance Document (EPA 1992); and the Monitoring Well Installation Plan for the Department of Energy Y-12 Plant, Oak Ridge, Tennessee (Energy Systems 1997a). Well installation and development of the non-Y-12 Plant GWPP oversight installation projects were conducted using procedures/guidance defined in the following documents: Work Plan for Support to Upper East Fork Poplar Creek East End Volatile Organic Compound Plumes Well Installation Project, Oak Ridge Y-12 Plant, Oak Ridge

  11. The effect of qualifying language on perceptions of drug appeal, drug experience, and estimates of side-effect incidence in DTC advertising.

    Science.gov (United States)

    Davis, Joel

    2007-01-01

    This study examined how the use of qualifying language in direct-to-consumer (DTC) pharmaceutical advertising affects consumers' perceptions of drug appeal, anticipated pleasantness of drug usage, and the expected incidence of side-effect occurrence. A sample of 669 individuals participated in a 2 x 8 complete factorial design. The design manipulated the number of side effects associated with drug use and the type of qualifying language used to describe the side effects. The eight experimental qualifying language cells represented one control condition (no qualifying language), three cells where each of three types of qualifying language were presented individually, and four cells where qualifying language was combined. The results indicate that qualifying language has a profound effect on drug perceptions, especially when used in combination. Drug appeal and the anticipated drug-using experience almost always were more positive in the presence of qualifying language. Qualifying language appears to exert its influence by causing individuals to reduce their estimate of the likelihood of experiencing individual side effects. Policy implications of the research, particularly for evaluation of "fair balance" and the reporting of side effects, are presented.

  12. 34 CFR 300.18 - Highly qualified special education teachers.

    Science.gov (United States)

    2010-07-01

    ... 34 Education 2 2010-07-01 2010-07-01 false Highly qualified special education teachers. 300.18... SPECIAL EDUCATION AND REHABILITATIVE SERVICES, DEPARTMENT OF EDUCATION ASSISTANCE TO STATES FOR THE... special education teachers. (a) Requirements for special education teachers teaching core academic...

  13. Towards Qualifiable Code Generation from a Clocked Synchronous Subset of Modelica

    Directory of Open Access Journals (Sweden)

    Bernhard Thiele

    2015-01-01

    Full Text Available So far no qualifiable automatic code generators (ACGs are available for Modelica. Hence, digital control applications can be modeled and simulated in Modelica, but require tedious additional efforts (e.g., manual reprogramming to produce qualifiable target system production code. In order to more fully leverage the potential of a model-based development (MBD process in Modelica, a qualifiable automatic code generator is needed. Typical Modelica code generation is a fairly complex process which imposes a huge development burden to any efforts of tool qualification. This work aims at mapping a Modelica subset for digital control function development to a well-understood synchronous data-flow kernel language. This kernel language allows to resort to established compilation techniques for data-flow languages which are understood enough to be accepted by certification authorities. The mapping is established by providing a translational semantics from the Modelica subset to the synchronous data-flow kernel language. However, this translation turned out to be more intricate than initially expected and has given rise to several interesting issues that require suitable design decisions regarding the mapping and the language subset.

  14. DAQ INSTALLATION IN USC COMPLETED

    CERN Multimedia

    A. Racz

    After one year of work at P5 in the underground control rooms (USC55-S1&S2), the DAQ installation in USC55 is completed. The first half of 2006 was dedicated to the DAQ infrastructures installation (private cable trays, rack equipment for a very dense cabling, connection to services i.e. water, power, network). The second half has been spent to install the custom made electronics (FRLs and FMMs) and place all the inter-rack cables/fibers connecting all sub-systems to central DAQ (more details are given in the internal pages). The installation has been carried out by DAQ group members, coming from the hardware and software side as well. The pictures show the very nice team spirit !

  15. Planning of installations in prefabricated buildings

    Directory of Open Access Journals (Sweden)

    Stanojević Ana D.

    2014-01-01

    Full Text Available Planning installations is becoming an increasing problem in construction, because the number of devices for technical supply is constantly increasing with continual progress in science and technology. Since the installations of the building can not be viewed unrelated of the construction, problem of its planning is more complicated in prefabricated buildings because the elements of construction are prefabricated. Planning was formerly performed by embedding the installation in prefabricated elements. This method had a lot of flaws, and modern approach tends setting installation out of prefabricated elements except when the traditional approach proves as economical. Although the hot water heating with radiators is the most practical way of heating in prefabricated buildings, the under floor heating systems have greater and greater use. Today, prefabricated sanitary cabins have a huge use and they are much more economical in comparison to special panels for bathrooms that were once create. Approaches in terms of planning electrical installation are different, but for conventional constructed buildings, as well as prefabricated buildings, the use of lightweight prefabricated walls with embedded installations, today is recommended, when the room is loaded with a large number of this installations and if it is possible.

  16. Lightning Imaging Sensor (LIS) on the International Space Station (ISS): Launch, Installation, Activation, and First Results

    Science.gov (United States)

    Blakeslee, R. J.; Christian, H. J., Jr.; Mach, D. M.; Buechler, D. E.; Wharton, N. A.; Stewart, M. F.; Ellett, W. T.; Koshak, W. J.; Walker, T. D.

    2017-12-01

    Over two decades, the NASA Marshall Space Flight Center, the University of Alabama in Huntsville, and their partners developed and demonstrated the effectiveness and value of space-based lightning observations as a remote sensing tool for Earth science research and applications, and, in the process, established a robust global lightning climatology. The Lightning Imaging Sensor (LIS) on the Tropical Rainfall Measuring Mission (TRMM) provided global observations of tropical lightning for an impressive 17 years before that mission came to a close in April 2015. Now a space-qualified LIS, built as the flight spare for TRMM, has been installed on the International Space Station (ISS) for a minimum two year mission following its SpaceX launch on February 19, 2017. The LIS, flown as a hosted payload on the Department of Defense Space Test Program-Houston 5 (STP-H5) mission, was robotically installed in an Earth-viewing position on the outside of the ISS, providing a great opportunity to not only extend the 17-year TRMM LIS record of tropical lightning measurements but also to expand that coverage to higher latitudes missed by the TRMM mission. Since its activation, LIS has continuously observed the amount, rate, and radiant energy lightning within its field-of-view as it orbits the Earth. A major focus of this mission is to better understand the processes which cause lightning, as well as the connections between lightning and subsequent severe weather events. This understanding is a key to improving weather predictions and saving lives and property here in the United States and around the world. The LIS measurements will also help cross-validate observations from the new Geostationary Lightning Mapper (GLM) operating on NOAA's newest weather satellite GOES-16. An especially unique contribution from the ISS platform will be the availability of real-time lightning data, especially valuable for operational forecasting and warning applications over data sparse regions such

  17. Electrical installations technology

    CERN Document Server

    Whitfield, J F

    1968-01-01

    Electrical Installations Technology covers the syllabus of the City and Guilds of London Institute course No. 51, the "Electricians B Certificate”. This book is composed of 15 chapters that deal with basic electrical science and electrical installations. The introductory chapters discuss the fundamentals and basic electrical principles, including the concept of mechanics, heat, magnetic fields, electric currents, power, and energy. These chapters also explore the atomic theory of electric current and the electric circuit, conductors, and insulators. The subsequent chapter focuses on the chemis

  18. Flat-plate solar collector - installation package

    Science.gov (United States)

    1978-01-01

    Package includes installation, operation and maintenance manual for collector, analysis of safety hazards, special handling instructions, materials list, installation drawings, and warranty and certification statement. Manual includes instructions for roof preparation and for preparing collector for installation. Several pages are devoted to major and minor repairs.

  19. Registration of qualified radiation protection experts in the Netherlands

    International Nuclear Information System (INIS)

    Abrahamse, J.C.; Kops, J.A.M.M.; Vermeulen, A.M.T.I.; Zuur, C.

    2002-01-01

    In Euratom Directive 96/29 (1) the Euratom Basic Safety Standards are given. The member states of the EC have to implement this directive in their national legislation. In the Netherlands this is done in the new radiation protection legislation (Radiation Protection Decree 2002 (2)), which came into force in the first half of 2002. In this new regulation is stated that radiological activities must be done by or under supervision of a qualified radiation protection expert. With respect to the qualified expert is stated that: the qualified expert must be registered in a notified registration system; rules will be formulated with respect to the demanded qualification levels of the experts. These demands can be different for different tasks rules will be formulated for the notification of the register, the way to become registered, the costs and so on. Mid 2001 a project is started to prepare the registration system. Information was gained from and discussions took place with the important parties on the radiological playing field in the Netherlands (employers, organisations of experts and education institutes). Furthermore information is obtained from certification institutes. It was decided to accept as starting point the education levels obtained from the radiation protection education institutes, which are approved at the moment. At a later phase will be evaluated whether this system needs to be changed. In section 2 of this paper the radiation protection system in the Netherlands will be discussed in more detail. Section 2 deals with the target group and in section 3 the outlines of the registration system to be developed are discussed

  20. [Community Service Program, Westmont College.

    Science.gov (United States)

    Kistler, Christina

    This report describes a 2-year project at Westmont College, California, which established a Community Service Program with the purposes of decreasing student debt and increasing student participation in community organizations. Eligible students worked 8-10 hours per week for a qualified community agency and received credit towards tuition for the…

  1. ERC Radiological Glovebag Program

    International Nuclear Information System (INIS)

    Nellesen, A.L.

    1997-07-01

    This document establishes the requirements and responsibilities for the standardized methods for installation, use, and dismantlement of glovebags within the Hanford Site Environmental Contractor Radiological Glovebag Program. This document addresses the following topics: Containment selection and fabrication, Glovebag fabrication, Containment installation and inspection, General glovebag containment work practices, Emergency situations, and Containment removal

  2. 13 CFR 125.13 - May 8(a) Program participants, HUBZone SBCs, Small and Disadvantaged Businesses, or Women-Owned...

    Science.gov (United States)

    2010-01-01

    ..., HUBZone SBCs, Small and Disadvantaged Businesses, or Women-Owned Small Businesses qualify as SDVO SBCs..., HUBZone SBCs, Small and Disadvantaged Businesses, or Women-Owned Small Businesses qualify as SDVO SBCs? Yes, 8(a) Program participants, HUBZone SBCs, Small and Disadvantaged Businesses, and Women-Owned SBCs...

  3. Safety of nuclear installations in Slovakia

    International Nuclear Information System (INIS)

    1998-01-01

    In this part next aspects are described: (1) Site selection (Legislation related to site selection; Meeting criteria at Bohunice and Mochovce sites; International agreements); (2) Design preparation and construction (Designing and construction-relevant legislation; Nuclear installation project preparation of nuclear installation at Mochovce site); (3) Operation (Operator licensing procedure; Operation limits and conditions; Maintenance testing and control documentation for management and operation; Technical support of operation; Analysis of events at nuclear installations and Radioactive waste production); (4) Planned safety upgrading activities at nuclear installations

  4. Comprehensive School Physical Activity Programs: Recommendations for Physical Education Teacher Education

    Science.gov (United States)

    Zhang, Xiaoxia; Gu, Xiangli; Zhang, Tao; Keller, Jean; Chen, Senlin

    2018-01-01

    Comprehensive school physical activity programs (CSPAPs) aim to promote physical activity and healthy lifestyles among school-age children and adolescents. Physical educators are highly qualified individuals taking on the role of certified physical activity leaders. Physical education teacher education (PETE) programs should consider preparing…

  5. Current emergency programs for nuclear installations in Japan

    International Nuclear Information System (INIS)

    Chino, Masamichi

    2007-01-01

    Large effort has been taken for nuclear emergency programs in Japan especially after the JCO accident. A special law for nuclear emergency was established after the accident. The law extended the scope of emergency preparedness to fuel cycle facilities, research reactors, etc. and clarified the roles and responsibilities of the national government, local governments and license holders. For initial responses, the action levels and action procedures are defined based on environmental doses and specific initial events of NPPs. A senior specialist was dispatched to each site for nuclear emergency and a facility 'Off-site center' to be used as the local emergency headquator was designated at each site. This paper describes the structure of emergency program, responsibility of related organizations and the definition of unusual events for notification and emergency. Emergency preparedness, emergency radiation monitoring and computer-based prediction of on- and off-site situation are also addressed. (author)

  6. Army Programs: Army Finance and Accounting Quality Assurance Program

    National Research Council Canada - National Science Library

    1988-01-01

    This regulation discusses the primary responsibilities of commanders and staff officers at installation and higher levels for execution of the Army Finance and Accounting Quality Assurance (QA) Program...

  7. Development of a Decommissioning Certificate Program

    International Nuclear Information System (INIS)

    Morton, M. R.

    1999-01-01

    A Decommissioning Certificate Program has been developed at Washington State University Tri-Cities (WSU TC) in conjunction with Bechtel Hanford, Inc. (BHI), and the U.S. Department of Energy (DOE)to address the increasing need for qualified professionals to direct and manage decommissioning projects. The cooperative effort between academia, industry, and government in the development and delivery of this Program of education and training is described, as well as the Program's design to prepare students to contribute sooner, and at a higher level, to decommissioning projects

  8. 78 FR 62350 - FFP Qualified Hydro 14, LLC; Western Minnesota Municipal Power Agency; Notice Announcing...

    Science.gov (United States)

    2013-10-18

    .... 14491-000] FFP Qualified Hydro 14, LLC; Western Minnesota Municipal Power Agency; Notice Announcing... applications were filed by FFP Qualified Hydro 14, LLC for Project No. 13579-002 and Western Minnesota... regular business day. See 18 CFR 385.2001(a)(2) (2013). On October 21, 2013, at 10:00 a.m. (Eastern Time...

  9. 12 CFR 617.7130 - What initial disclosures must a qualified lender make to a borrower?

    Science.gov (United States)

    2010-01-01

    ... lender make to a borrower? 617.7130 Section 617.7130 Banks and Banking FARM CREDIT ADMINISTRATION FARM... must a qualified lender make to a borrower? (a) Required disclosures—in general. A qualified lender... certificates that borrowers are required to purchase are at risk and may only be retired at the discretion of...

  10. 46 CFR 111.60-5 - Cable installation.

    Science.gov (United States)

    2010-10-01

    ... REQUIREMENTS Wiring Materials and Methods § 111.60-5 Cable installation. (a) Each cable installation must meet... 46 Shipping 4 2010-10-01 2010-10-01 false Cable installation. 111.60-5 Section 111.60-5 Shipping... incorporated by reference; see 46 CFR 110.10-1), including clause 8. (b) Each cable installation made in...

  11. Performance of buried pipe installation.

    Science.gov (United States)

    2010-05-01

    The purpose of this study is to determine the effects of geometric and mechanical parameters : characterizing the soil structure interaction developed in a buried pipe installation located under : roads/highways. The drainage pipes or culverts instal...

  12. Qualified expert training: the ERPC (European Radiation Protection Course)

    International Nuclear Information System (INIS)

    Deboodt, P.; Bourguignon, M.; Juhel, T.; Lirsac, N.; Luciani, A.; Marco, M.; Schmitt-Hanning, A. M.; Van der Steen, J.

    2003-01-01

    Since 2000, a training for the qualified experts is organised by several European partners in France at Saclay near Pais. The objective of this training is to deliver the theoretical knowledge needed to be recognised as a qualified expert in radiation protection according to the European requirements. The training delivered in English, includes four independent modules; basics, occupational exposure in nuclear and industrial applications, medical exposures (patients and workers), radiation protection of the members of the public and the environment (4 or 5 weeks each). A written examination is organised at the end of each module. Lectures, practical works, exercises and visits are given by European lecturers. Students have the possibility to register in one or several module during one or several years. Participants could be students or professionals from all European countries satisfying the pre requite defined by the European board. A certificate validating the successfully passed modules will be delivered by the INSTN (National Institute of Nuclear Sciences and Technologies)

  13. Qualified expert training: the ERPC (European Radiation Protection Course)

    Energy Technology Data Exchange (ETDEWEB)

    Deboodt, P.; Bourguignon, M.; Juhel, T.; Lirsac, N.; Luciani, A.; Marco, M.; Schmitt-Hanning, A. M.; Van der Steen, J.

    2003-07-01

    Since 2000, a training for the qualified experts is organised by several European partners in France at Saclay near Pais. The objective of this training is to deliver the theoretical knowledge needed to be recognised as a qualified expert in radiation protection according to the European requirements. The training delivered in English, includes four independent modules; basics, occupational exposure in nuclear and industrial applications, medical exposures (patients and workers), radiation protection of the members of the public and the environment (4 or 5 weeks each). A written examination is organised at the end of each module. Lectures, practical works, exercises and visits are given by European lecturers. Students have the possibility to register in one or several module during one or several years. Participants could be students or professionals from all European countries satisfying the pre requite defined by the European board. A certificate validating the successfully passed modules will be delivered by the INSTN (National Institute of Nuclear Sciences and Technologies).

  14. Maintenance program guidelines for programmatic equipment

    International Nuclear Information System (INIS)

    1994-11-01

    The Division Directors at Lawrence Berkeley Laboratory are responsible for implementing a maintenance program for research equipment (also referred to as programmatic equipment) assigned to them. The program must allow maintenance to be accomplished in a manner that promotes operational safety, environmental protection and compliance, and cost effectiveness; that preserves the intended functions of the facilities and equipment; and that supports the programmatic mission of the Laboratory. Programmatic equipment -- such as accelerators, lasers, radiation detection equipment, and glove boxes -- is dedicated specifically to research. Installed equipment, by contrast, includes the mechanical and electrical systems installed as part of basic building construction, equipment essential to the normal functioning of the facility and its intended use. Examples of installed equipment are heating, ventilating, and air conditioning systems; elevators; and communications systems. The LBL Operating and Assurance Program Plan (PUB-3111, Revision 4) requires that a maintenance program be prepared for programmatic equipment and defines the basic maintenance program elements. Such a program of regular, documented maintenance is vital to the safety and quality of research activities. As a part of that support, this document offers guidance to Laboratory organizations for developing their maintenance programs. It clarifies the maintenance requirements of the Operating and Assurance Program (OAP) and presents an approach that, while not the only possibility, can be expected to produce an effective maintenance program for research equipment belonging to the Laboratory's organizations

  15. Implementing Relative Ranking Evaluation Framework at Department of Energy (DOE) installations

    International Nuclear Information System (INIS)

    Sharma, S.K.; Williamson, D.; Treichel, L.C.; James, L.M.

    1996-01-01

    The US Department of Energy (DOE) Office of Environmental Restoration (EM-40) has developed the Relative Ranking Evaluation Framework (RREF) to help categorize release sites, facilities and buildings requiring restoration or decommissioning. Based on this framework, a computer tool, the Relative Rank Evaluation Program (RREP) has been developed to evaluate release sites, facilities and buildings, and to manage information pertaining to relative ranking evaluations. The relative ranking information is being used by both Headquarters and field project managers, and other environmental personnel responsible for planning, executing and evaluation environmental restoration activities at DOE installations. External stakeholders, such as representatives of federal and state regulatory agencies, local governments and communities in the vicinity of current and formerly used DOE installations may use this data to review proposed and planned activities

  16. 26 CFR 1.188-1 - Amortization of certain expenditures for qualified on-the-job training and child care facilities.

    Science.gov (United States)

    2010-04-01

    ... qualified on-the-job training and child care facilities. 1.188-1 Section 1.188-1 Internal Revenue INTERNAL... qualified on-the-job training and child care facilities. (a) Allowance of deduction—(1) In general. Under... operation of a qualified on-the-job training or child care facility or are integrally related facilities...

  17. Method for programming a flash memory

    Energy Technology Data Exchange (ETDEWEB)

    Brosky, Alexander R.; Locke, William N.; Maher, Conrado M.

    2016-08-23

    A method of programming a flash memory is described. The method includes partitioning a flash memory into a first group having a first level of write-protection, a second group having a second level of write-protection, and a third group having a third level of write-protection. The write-protection of the second and third groups is disabled using an installation adapter. The third group is programmed using a Software Installation Device.

  18. Installation and Service: HVAC. Program CIP: 47.0201

    Science.gov (United States)

    Research and Curriculum Unit, 2009

    2009-01-01

    Secondary vocational-technical education programs in Mississippi are faced with many challenges resulting from sweeping educational reforms at the national and state levels. Schools and teachers are increasingly being held accountable for providing true learning activities to every student in the classroom. This accountability is measured through…

  19. Workforce challenges and opportunities in the solar photovoltaic industry in Toronto

    International Nuclear Information System (INIS)

    Saneinejad, Sheyda

    2011-01-01

    In December 2009, the city of Toronto adopted principles and targets for the city's sustainable energy future. The city plans to install 2 MW of solar photovoltaic panels in its facilities. The aim of this study is to assess the impact of such a project, as well as further expansion of solar photovoltaic energy generation, from the economic development perspective. A literature review, online surveys and interviews with solar industries were carried out and a job estimation model was developed. Results showed that the 2 MW installation would create 53 person years of employment locally while expansion of the technology throughout the city could generate 100,000 local jobs. However this research also pointed out a lack of suitably qualified and experienced personnel Canada-wide. This study demonstrated that the solar photovoltaic industry has the potential to provide significant economic benefits in Toronto but that certification programs must be put in place to address the lack of qualified personnel.

  20. Attributes of quality programs in universities in developing countries: Case studies of two private universities in Ecuador and beyond

    Science.gov (United States)

    Uriguen, Monica I.

    This study sought to identify the key attributes of high-quality programs with an eye toward helping developing countries such as Ecuador advance program quality. The dissertation is divided into five chapters: (1) introduction to high-quality programs; (2) literature review of attributes of high-quality programs; (3) grounded theory method (including interviews with 60 individuals) used to identify program attributes that enhance student learning; (4) findings; and (5) conclusions and recommendations. Following are the five clusters and thirteen attributes of high-quality programs that I identified: Cluster One: Highly Qualified Participants: (1) Highly Qualified Faculty, and (2) Highly Qualified Students; Cluster Two: Learning-Centered Cultures: (3) Shared Program Direction Focused on Learning, (4) Real-World Learning Experiences, (5) Reading-Centered Culture, and (6) Supportive and Risk-Taking Environment; Cluster Three: Interactive Teaching and Learning: (7) Integrative learning: Theory with Practice, Self with Subject, and (8) Exclusive Tutoring and Mentoring; Cluster Four: Connected Program Requirements: (9) Planned Breadth and Depth Course Work, and (10) Tangible Products; and Cluster Five: Adequate Resources: (11) Support for Students, (12) Support for Faculty, and (13) Support for Campus Infrastructure. The study was guided by Haworth and Conrad's (1997) "Engagement Theory of High-Quality Programs." Eleven of the attributes of high-quality programs are closely connected to Haworth and Conrad's theory and the other two attributes---real-world learning experiences and a reading-centered culture---make the signature theoretical contributions of the study. Real-world learning experiences encourage the active involvement of stakeholders in designing curricula with real-world learning experiences. The second attribute---a reading-centered culture---has never before been identified in the literature. There are four key differences between Haworth and Conrad

  1. Nursing educator perspectives of overseas qualified nurses' intercultural clinical communication: barriers, enablers and engagement strategies.

    Science.gov (United States)

    Philip, Susan; Manias, Elizabeth; Woodward-Kron, Robyn

    2015-09-01

    To understand the intercultural communication experiences and associated communication training needs of overseas qualified nurses in the Australian healthcare system from the unique perspectives of nurse educators teaching in accredited bridging programmes. Overseas qualified nurses are an integral part of the nursing workforce in migration destination countries. Communication training needs are more complex when there are cultural, ethnic and language differences between nurses, other health professionals and patients. A qualitative, exploratory research design using semi-structured interviews. All (nine) organisations involved in conducting the Australian Health Practitioner Regulation Agency approved preregistration bridging programmes for overseas qualified nurses within the state of Victoria, Australia, were involved in the study. Participants were 12 nurse educators employed in these organisations. Thematic analysis was undertaken. Three macro themes emerged about the overseas qualified nurses' intercultural communication: (1) pre-existing barriers and enablers to intercultural communication, for example, nurses' reluctance to engage in communicative strategies that build rapport with patients, (2) transitional behaviours and impact on communication, including maintenance of perceived cultural hierarchies between health professionals and (3) development of communicative competence, including expanding one's repertoire of conversational gambits. The findings point to the domains and causes of communication challenges facing overseas qualified nurses in new healthcare settings as well as strategies that the nurse educators and nurses can adopt. Communication cannot be merely regarded as a skill that can be taught in a didactic programme. Comprehensive understanding is needed about the sociocultural dimensions of these nurses' orientation, which can impact on how they communicate in their new healthcare settings. The findings can act as triggers for discussion

  2. Program Fullerene

    DEFF Research Database (Denmark)

    Wirz, Lukas; Peter, Schwerdtfeger,; Avery, James Emil

    2013-01-01

    Fullerene (Version 4.4), is a general purpose open-source program that can generate any fullerene isomer, perform topological and graph theoretical analysis, as well as calculate a number of physical and chemical properties. The program creates symmetric planar drawings of the fullerene graph, an......-Fowler, and Brinkmann-Fowler vertex insertions. The program is written in standard Fortran and C++, and can easily be installed on a Linux or UNIX environment....

  3. A Competence-Based Curriculum Design for Entrepreneurship Study Program

    Directory of Open Access Journals (Sweden)

    Priska J.R. Siagian

    2011-08-01

    Full Text Available Indonesia is affected by global crisis. Increasing the number of entrepreneurs is one of many solutions to increase the economic growth in Indonesia. The number of entrepreneurs in Indonesia to leverage the economic growth is still limited. Entrepreneurs can be prepared through an Entrepreneurship Study Program. Entrepreneurship Study Program attempts to create qualified entrepreneurs who have relevant competences. In order to create a qualified entrepreneurs, the Entrepreneurial Studies Program requires a competency-based curriculum that will support the educational process and provide all the necessary to become future entrepreneurs who can survive through a global challenge. This research aims to design a competence-based curriculum for entrepreneurial study and uses Quality Function Deployment (QFD as the major tool to design the competence-based curriculum. From the QFD process, this research finds core and elective courses for the Entrepreneurship Study Program. The result shows the competences covered by the courses and sequence, credits, and teaching methods for each course. The competences prepared the potential entrepreneurs can be achieved through specific courses which can be acquired within 8 semesters.

  4. Assessment of demand for and supply of qualified manpower for the nuclear industry

    International Nuclear Information System (INIS)

    Morelle, J.

    1993-01-01

    The OECD Nuclear Energy Agency recently published a study which presents the results of a pioneering survey of the demand for and the supply of qualified manpower in various sectors of the nuclear industry (including medicine), and in the related areas of regulation and education in 12 OECD countries. The current manpower situation is presented and the future demand is reviewed. Present and future activities of OECD countries to ensure a balance between supply and demand of qualified manpower are discussed

  5. 26 CFR 1.221-2 - Deduction for interest due and paid on qualified education loans before January 1, 2002.

    Science.gov (United States)

    2010-04-01

    ... Individuals § 1.221-2 Deduction for interest due and paid on qualified education loans before January 1, 2002... interest due and paid by the taxpayer during the taxable year on a qualified education loan. The deduction is allowed only with respect to interest due and paid on a qualified education loan during the first...

  6. Virginia Tech team qualifies as DARPA Urban Challenge semi-finalist

    OpenAIRE

    Crumbley, Liz

    2007-01-01

    "VictorTango," a team of Virginia Tech engineering and geography students, will travel to Victorville, Calif., for the national qualifying rounds of the Urban Challenge autonomous vehicle competition, sponsored by the Defense Advanced Research Projects Agency (DARPA).

  7. Professional operation and management of nuclear island installation

    International Nuclear Information System (INIS)

    Ma Limin

    2011-01-01

    As an important part of nuclear power plant construction, nuclear island installation mainly involves main equipment installation, pipeline installation, associated procedure examination and other important tasks. However, due to the nuclear island installation management changing from single project to multi-projects, the problems such as professional management of nuclear island installation and the lack of technical staff become more and more prominent and become one of the key restricts to the work of nuclear island installation. Based on analysis of the single project, single-base nuclear island installation management and practice, combined with the current situation that multi-project and multi-base construction of nuclear power are carrying out at the same time, this paper proposes a new management model of nuclear island installation. (author)

  8. Planning and installing photovoltaic systems a guide for installers, architects and engineers

    CERN Document Server

    Deutsche Gesellschaft für Sonnenenergie (DGS)

    2013-01-01

    New third edition of the bestselling manual from the German Solar Energy Society (DGS), showing you the essential steps to plan and install a solar photovoltaic system. With a global focus, it has been updated to include sections on new technology and concepts, new legislation and the current PV market.Updates cover:new developments in inverter and module technologymarket situation worldwide and outlookintegration to the grid (voltage stabilization, frequency, remote control)new legal requirements for installation and planningoperational costs for dismantling and recyclingfeed-in managementnew requirements for fire protectionnew requirements in Europe for electric waste (Waste Electrical and Electronic Equipment, WEEE) and the restriction of the use of certain hazardous substances (RoHS).Also providing information on current developments in system design, economic analysis, operation and maintenance of PV systems, as well as new software tools, hybrid and tracking systems.An essential manual for installers, e...

  9. A General Purpose High Performance Linux Installation Infrastructure

    International Nuclear Information System (INIS)

    Wachsmann, Alf

    2002-01-01

    With more and more and larger and larger Linux clusters, the question arises how to install them. This paper addresses this question by proposing a solution using only standard software components. This installation infrastructure scales well for a large number of nodes. It is also usable for installing desktop machines or diskless Linux clients, thus, is not designed for cluster installations in particular but is, nevertheless, highly performant. The infrastructure proposed uses PXE as the network boot component on the nodes. It uses DHCP and TFTP servers to get IP addresses and a bootloader to all nodes. It then uses kickstart to install Red Hat Linux over NFS. We have implemented this installation infrastructure at SLAC with our given server hardware and installed a 256 node cluster in 30 minutes. This paper presents the measurements from this installation and discusses the bottlenecks in our installation

  10. Implementation of a Quality Assurance Program in a new Radiotherapy Center taking as base the TG-40; Implementacion del programa de Garantia de Calidad en un Centro nuevo de Radioterapia tomando como base el TG-40

    Energy Technology Data Exchange (ETDEWEB)

    Marles, A.; Besa, P.; Hecht, P.; Arriagada, L.; Ruz, A.; Garay, C. [Pontificia Universidad Catolica de Chile, Centro de Cancer. Diagonal Paraguay, 319. Santiago (Chile)

    1998-12-31

    The recommended principles in the `Comprehensive QA for radiation oncology: Report of AAPM Radiation Therapy Committee Task Group 40`, TG-40, have been the base for implementation of the Quality Assurance Program of a modern Radiotherapy service. During its application has been necessary: to initiate its implementation before the equipment installation, assuming the costs of the contracts of the qualified personnel, realizing an initial investment adequate for equipment acquisition necessary for acceptation, commissioning and routinary control, the experienced formation of the personnel in the protocol philosophy, establishing procedures for day by day process which would allow the retrofeeding, the elaboration of templates and opening to changes and adjustments according to the necessities. The experience of two years had been demonstrated that the TG-40: a) It is feasible to be implemented but sometimes no strict totally and it is essential to have qualified personnel and the necessary material resources; b) It does not contains all the necessary for its practical implementation and must be completing with procedures and routine formats which facilitate their application; c) It allows the detection and opportune failure correction in the process; d) It is a continuous process that does not finishes. (Author)

  11. Spatial factors as contextual qualifiers of information seeking

    Directory of Open Access Journals (Sweden)

    R. Savolainen

    2006-01-01

    Full Text Available Introduction. This paper investigates the ways in which spatial factors have been approached in information seeking studies. The main attention was focused on studies discussing information seeking on the level of source selection and use. Method. Conceptual analysis of about 100 articles and books thematizing spatial issues of information seeking. Due to research economy, the main attention was paid to studies on everyday life information seeking. Results. Three major viewpoints were identified with regard to the degree of objectivity of spatial factors. The objectifying approach conceives of spatial factors as external and entity-like qualifiers that primarly constrain information seeking. The realistic-pragmatic approach emphasizes the ways in which the availabilty of information sources in different places such as daily work environments orient information seeking. The perspectivist approach focuses on how people subjectively assess the significance of various sources by means of spatial constructs such as information horizons. Conclusion. Spatial factors are centrally important contextual qualifiers of information seeking. There is a need to further explore the potential of the above viewpoints by relating the spatial and temporal factors of information seeking.

  12. 78 FR 66355 - Pleasant Grove City, UT; Notice of Preliminary Determination of a Qualifying Conduit Hydropower...

    Science.gov (United States)

    2013-11-05

    ... City, UT; Notice of Preliminary Determination of a Qualifying Conduit Hydropower Facility and... Grove City, Utah (Pleasant Grove) filed a notice of intent to construct a qualifying conduit hydropower facility, pursuant to section 30 of the Federal Power Act, as amended by section 4 of the Hydropower...

  13. 78 FR 53752 - City of Sandpoint, Idaho; Notice of Preliminary Determination of a Qualifying Conduit Hydropower...

    Science.gov (United States)

    2013-08-30

    ... Sandpoint, Idaho; Notice of Preliminary Determination of a Qualifying Conduit Hydropower Facility and... intent to construct a qualifying conduit hydropower facility, pursuant to section 30 of the Federal Power Act, as amended by section 4 of the Hydropower Regulatory Efficiency Act of 2013 (HREA). The Little...

  14. 78 FR 61985 - City of Astoria, Oregon; Notice of Preliminary Determination of a Qualifying Conduit Hydropower...

    Science.gov (United States)

    2013-10-09

    ..., Oregon; Notice of Preliminary Determination of a Qualifying Conduit Hydropower Facility and Soliciting... of intent to construct a qualifying conduit hydropower facility, pursuant to section 30 of the Federal Power Act, as amended by section 4 of the Hydropower Regulatory Efficiency Act of 2013 (HREA). The...

  15. Using neutrosophic graph cut segmentation algorithm for qualified rendering image selection in thyroid elastography video.

    Science.gov (United States)

    Guo, Yanhui; Jiang, Shuang-Quan; Sun, Baiqing; Siuly, Siuly; Şengür, Abdulkadir; Tian, Jia-Wei

    2017-12-01

    Recently, elastography has become very popular in clinical investigation for thyroid cancer detection and diagnosis. In elastogram, the stress results of the thyroid are displayed using pseudo colors. Due to variation of the rendering results in different frames, it is difficult for radiologists to manually select the qualified frame image quickly and efficiently. The purpose of this study is to find the qualified rendering result in the thyroid elastogram. This paper employs an efficient thyroid ultrasound image segmentation algorithm based on neutrosophic graph cut to find the qualified rendering images. Firstly, a thyroid ultrasound image is mapped into neutrosophic set, and an indeterminacy filter is constructed to reduce the indeterminacy of the spatial and intensity information in the image. A graph is defined on the image and the weight for each pixel is represented using the value after indeterminacy filtering. The segmentation results are obtained using a maximum-flow algorithm on the graph. Then the anatomic structure is identified in thyroid ultrasound image. Finally the rendering colors on these anatomic regions are extracted and validated to find the frames which satisfy the selection criteria. To test the performance of the proposed method, a thyroid elastogram dataset is built and totally 33 cases were collected. An experienced radiologist manually evaluates the selection results of the proposed method. Experimental results demonstrate that the proposed method finds the qualified rendering frame with 100% accuracy. The proposed scheme assists the radiologists to diagnose the thyroid diseases using the qualified rendering images.

  16. 9 CFR 77.36 - Interstate movement from qualified herds.

    Science.gov (United States)

    2010-01-01

    ... date of movement. If a group of captive cervids from a qualified herd is being moved interstate... unclassified herd. (4) Captive cervids being moved interstate for the purpose of exhibition only may be moved... being moved directly from a classified herd, the captive cervid must be isolated from all other animals...

  17. 24 CFR 266.100 - Qualified housing finance agency (HFA).

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 2 2010-04-01 2010-04-01 false Qualified housing finance agency (HFA). 266.100 Section 266.100 Housing and Urban Development Regulations Relating to Housing and Urban Development (Continued) OFFICE OF ASSISTANT SECRETARY FOR HOUSING-FEDERAL HOUSING COMMISSIONER, DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT MORTGAGE...

  18. Buckling of Bucket Foundations During Installation

    DEFF Research Database (Denmark)

    Madsen, Søren

    There is a great politically will to expand the green energy market in these times. A proven green technology is wind turbines. Wind turbines have been installed in great numbers on land over the last decades. However, the current development in wind turbine design leads to larger turbine sizes...... in order to reduce the cost of energy. This limits the on land application due to transportation limitations and unwillingness from prospect neighbours. Thus, offshore wind energy started developing over the last couple of years. Although installing the wind turbines offshore resolves the before men tioned...... issues, it brings up the cost of energy mainly due to increased installation and maintenance costs. A very large part—up to 30–50% using current technology—of the installation cost origins from the expenses related to the installation of foundations. A new foundation concept—the bucket foundation...

  19. 78 FR 56872 - City of Barre, Vermont; Notice of Preliminary Determination of a Qualifying Conduit Hydropower...

    Science.gov (United States)

    2013-09-16

    ..., Vermont; Notice of Preliminary Determination of a Qualifying Conduit Hydropower Facility and Soliciting... construct a qualifying conduit hydropower facility, pursuant to section 30 of the Federal Power Act, as amended by section 4 of the Hydropower Regulatory Efficiency Act of 2013 (HREA). The Nelson Street 17 kW...

  20. Spectrometric assembly for portable installations

    International Nuclear Information System (INIS)

    Kluger, A.; Popescu, C.

    1997-01-01

    The components of the portable spectrometric assembly are: - the detecting probe with Na I(Tl) crystal and air-tight case of industrial type; - a microcomputer; - a unit of analogical processing of the signal from the detecting probe; - a single-channel analyzer with adjustable threshold; - commands and display module; - a source of high voltage; - an electrical supply battery. The device uses the method of gamma photons detection in energetic windows. Through theoretical and experimental studies carried out during the prototype development phase, the superiority of this method has been proved as compared with the installations which make use of the classical principle of photon integral detection. The achieved prototype has a basic program enabling the setting of all working parameters (measuring time, discriminating thresholds, discriminators operating conditions, etc.). Through the included interface RS232 it is possible to transmit the data to a more powerful computer in order to continually process the results. The spectrometric assembly, realized on the basis of micro-computers, can be used in a wide range of applications: measurement of thickness and erosion of walls and tubes, measurement of level in closed containers, of soil density, etc. The adjustment for specific application is performed only through a program modification. (authors)

  1. A longitudinal, mixed methods investigation of newly qualified nurses' workplace stressors and stress experiences during transition.

    Science.gov (United States)

    Halpin, Yvonne; Terry, Louise M; Curzio, Joan

    2017-11-01

    To investigate transition in newly qualified nurses through an exploration of their stressors and stress experiences during their first 12 months postqualifying. Globally, thousands of new nurses qualify annually. They are crucial for the profession and healthcare service delivery. Work-related stress has multiple serious consequences, yet there is a lack of robust, empirical evidence that directly analyses newly qualified nurses and the stress they feel and experience in the workplace. Understanding what causes newly qualified nurses' stress is vital to retaining and nurturing this vital component of the workforce. Longitudinal, explanatory sequential mixed methods, cohort study. At the point of qualification (n = 288), 6 months postqualifying (n = 107) and 12 months postqualifying (n = 86), newly qualified nurses completed the Nursing Stress Scale, with 14 completing a one-to-one interview at 12 months postqualifying. Data were collected from 2010 - 2012. Inferential statistics, "thematic analysis" and "side-by-side comparisons in a discussion" were used for analysis. Workload was consistently the highest reported stressor with inadequate staffing and managing multiple role demands given as explanations. Incivility within the workplace was a noted stressor. Conversely, being part of "a good team" provided a civil, supportive, facilitative work environment. Entering nurse education with previous healthcare experience had a mediating effect on the reported frequency of stressors. Newly qualified nurses encounter multiple work-related stressors over their first 12 months postqualifying, which are intrinsically entwined with their transition. Employing organizations need to be more proactive in managing their workload and addressing workplace incivility. © 2017 John Wiley & Sons Ltd.

  2. 31 CFR Appendix A to Part 500 - Qualifying International Institutions

    Science.gov (United States)

    2010-07-01

    ... Pt. 500, App. A Appendix A to Part 500—Qualifying International Institutions Asian Development Bank (ADB) Food and Agricultural Organization (FAO) International Bank for Reconstruction and Development (IBRD, the “World Bank”) International Civil Aviation Organization (ICAO) International Development...

  3. Current status and installation of dental PACS

    International Nuclear Information System (INIS)

    Park, Chang Seo; Kim, Kee Deog; Park, Hyok; Jeong, Ho Gul

    2004-01-01

    Picture Archiving and Communication System (PACS) is difficult to implement in the best of situations, but evidence is growing that the benefits are significant. The aims of this study are to analyze the current status of full PACS and establish successful installation standard of dental PACS. Materials and Methods were based on the investigation of current working status and installation standard of PACS, and observation of variable issues to installation of dental PACS. By September 30, 2004, full PACS implementations in their facilities were 88.1% in specialized general hospitals (37 installations out of total 42 hospitals), 59.8% in general hospitals (144 installations out of total 241 hospitals), 12.3% in medical hospitals (116 installations out of total 941 hospitals) and 3.6% in dental hospitals (4 installations out of total 110 hospitals). Only 4 university dental hospitals currently have installed and are operating full PACS. Major obstacle to wide spread of dental PACS is initial high investments. Clinical environments of dental PACS differed from medical situation. Because of characteristic dental practice, the initial investments for dental PACS are generally much greater than those of medical PACS. Also new economic crisis makes users scruple. The best way to overcome these limitations is to establish an economic installation standard for dental PACS. Also the clear technical communication between the customer and the supplier before both sides are committed to the obstacles are critical to its success.

  4. Does drywall installers' innovative idea reduce the ergonomic exposures of ceiling installation: A field case study.

    Science.gov (United States)

    Dasgupta, Priyadarshini Sengupta; Punnett, Laura; Moir, Susan; Kuhn, Sarah; Buchholz, Bryan

    2016-07-01

    The study was conducted to assess an intervention suggested by the workers to reduce the physical or ergonomic exposures of the drywall installation task. The drywall installers were asked to brainstorm on innovative ideas that could reduce their ergonomic exposures during the drywall installation work. The workers proposed the idea of using a 'deadman' (narrow panel piece) to hold the panels to the ceiling while installing them. The researcher collected quantitative exposure data (PATH, 3DSSPP) at the baseline and intervention phases and compared the phases to find out any change in the exposure while using the 'deadman'. Results showed that ergonomic exposures (such as overhead arm and awkward trunk postures and heavy load handling) were reduced at the intervention phase while using the 'deadman' with an electrically operated lift. The concept of the 'deadman', which was shown to help reduce musculoskeletal exposures during ceiling installation, can be used to fabricate a permanent ergonomic tool to support the ceiling drywall panel. Copyright © 2016 Elsevier Ltd and The Ergonomics Society. All rights reserved.

  5. Installations solaires photovoltaïques

    CERN Document Server

    2014-01-01

    Cet ouvrage présente les règles de conception et de mise en œuvre des installations photovoltaïques raccordées au réseau public de distribution à basse tension. Il s’applique aux bâtiments neufs et existants et concerne non seulement les petites installations résidentielles, d’une puissance de l’ordre de quelques kWc, mais aussi celles des bâtiments collectifs, tertiaires ou agricoles. Il traite successivement : - des fondamentaux de l'énergie solaire photovoltaïque (gisement solaire, principe de la conversion, composants d'une installation...) ; - du dimensionnement de l'installation (choix des matériels, règles de conception, estimation de l'énergie récupérable...) ; - de sa mise en oeuvre (travail en hauteur, habilitation électrique, mise en service, maintenance...) ; - des démarches administratives nécessaires (aides financières, accès au réseau de distribution, vente de l'électricité produite...).

  6. Solar Installation Labor Market Analysis

    Energy Technology Data Exchange (ETDEWEB)

    Friedman, B.; Jordan, P.; Carrese, J.

    2011-12-01

    The potential economic benefits of the growing renewable energy sector have led to increased federal, state, and local investments in solar industries, including federal grants for expanded workforce training for U.S. solar installers. However, there remain gaps in the data required to understand the size and composition of the workforce needed to meet the demand for solar power. Through primary research on the U.S. solar installation employer base, this report seeks to address that gap, improving policymakers and other solar stakeholders understanding of both the evolving needs of these employers and the economic opportunity associated with solar market development. Included are labor market data covering current U.S. employment, expected industry growth, and employer skill preferences for solar installation-related occupations. This study offers an in-depth look at the solar installation sectors. A study published by the Solar Foundation in October 2011 provides a census of labor data across the entire solar value chain.

  7. 77 FR 23373 - Small Business Investment Companies-Energy Saving Qualified Investments

    Science.gov (United States)

    2012-04-19

    ... appropriate for inclusion in the definition. Furthermore, if a Small Business generates revenues solely from... definition of Energy Saving Qualified Investment by adding a presumption that a Small Business will be...

  8. A missing piece of the workforce puzzle. The experiences of internationally qualified nurses in New Zealand: a literature review.

    Science.gov (United States)

    Jenkins, Brittany Lauren; Huntington, Annette

    2015-01-01

    To analyse the literature regarding the context and experiences of internationally qualified registered nurses, particularly Filipino and Indian nurses, who have transitioned to New Zealand. Internationally qualified nurses are a significant proportion of the nursing workforce in many developed countries including New Zealand. This is increasingly important as populations age, escalating demand for nurses. Understanding the internationally qualified nurse experience is required as this could influence migration in a competitive labour market. Examination of peer-reviewed research, policy and discussion documents, and technical reports. A systematic literature search sought articles published between 2001 and 2014 using Google Scholar, CINAHL, and Medline. Articles were critically appraised for relevance, transferability, and methodological rigour. Fifty-one articles met inclusion criteria and demonstrate internationally qualified nurses face significant challenges transitioning into New Zealand. The internationally qualified nurse experience of transitioning into a new country is little researched and requires further investigation.

  9. Monitoring and Assessment of Military Installation Land Condition under Training Disturbance Using Remote Sensing

    Science.gov (United States)

    Rijal, Santosh

    Various military training activities are conducted in more than 11.3 million hectares of land (> 5,500 training sites) in the United States (U.S.). These training activities directly and indirectly degrade the land. Land degradation can impede continuous military training. In order to sustain long term training missions and Army combat readiness, the environmental conditions of the military installations need to be carefully monitored and assessed. Furthermore, the National Environmental Policy Act of 1969 (NEPA) and the U.S. Army Regulation 200-2 require the DoD to minimize the environmental impacts of training and document the environmental consequences of their actions. To achieve these objectives, the Department of Army initiated an Integrated Training Area Management (ITAM) program to manage training lands through assessing their environmental requirements and establishing policies and procedures to achieve optimum, sustainable use of training lands. One of the programs under ITAM, Range and Training Land Assessment (RTLA) was established to collect field-based data for monitoring installation's environmental condition. Due to high cost and inefficiencies involved in the collection of field data, the RTLA program was stopped in several military installations. Therefore, there has been a strong need to develop an efficient and low cost remote sensing based methodology for assessing and monitoring land conditions of military installations. It is also important to make a long-term assessment of installation land condition for understanding cumulative impacts of continuous military training activities. Additionally, it is unclear that compared to non-military land condition, to what extent military training activities have led to the degradation of land condition for military installations. The first paper of this dissertation developed a soil erosion relevant and image derived cover factor (ICF) based on linear spectral mixture (LSM) analysis to assess and

  10. Development of a Decommissioning Certificate Program; TOPICAL

    International Nuclear Information System (INIS)

    M. R. Morton

    1999-01-01

    A Decommissioning Certificate Program has been developed at Washington State University Tri-Cities (WSU TC) in conjunction with Bechtel Hanford, Inc. (BHI), and the U.S. Department of Energy (DOE)to address the increasing need for qualified professionals to direct and manage decommissioning projects. The cooperative effort between academia, industry, and government in the development and delivery of this Program of education and training is described, as well as the Program's design to prepare students to contribute sooner, and at a higher level, to decommissioning projects

  11. 46 CFR 58.10-5 - Gasoline engine installations.

    Science.gov (United States)

    2010-10-01

    ... MACHINERY AND RELATED SYSTEMS Internal Combustion Engine Installations § 58.10-5 Gasoline engine installations. (a) Engine design. All installations shall be of marine type engines suitable for the intended... of such protection. (d) Exhaust pipe. (1) Exhaust pipe installations must conform to the requirements...

  12. Installation for analytic chemistry under irradiation; Installation de chimie analytique sous rayonnement

    Energy Technology Data Exchange (ETDEWEB)

    Fradin, J; Azoeuf, P; Guillon, A [Commissariat a l' Energie Atomique, Saclay (France). Centre d' Etudes Nucleaires

    1966-07-01

    An installation has been set up for carrying out manipulations and chemical analyses on radioactive products. It is completely remote-controlled and is of linear shape, 15 metres long; it is made up of three zones: - an active zone containing the apparatus, - a rear zone giving access to the active zone, - a forward zone independent of the two others and completely protected from which the remote-control of the apparatus is effected. The whole assembly has been designed so that each apparatus corresponding to an analytical technique is set up in a sealed enclosure. The sealed enclosures are interconnected by a conveyor. After three years operation, a critical review is now made of the installation. (authors) [French] L'installation a ete realisee pour effectuer des manipulations et des analyses chimiques sur des produits radioactifs. Elle est totalement telecommandee et se presente sous une forme lineaire de 15 metres de longueur et comporte trois zones: - une zone active d'appareillage, - une zone arriere d'intervention, - une zone avant independante des deux premieres et totalement protegee, ou s'operent les telecommandes de l'appareillage. L'ensemble a ete concu de facon a ce que chaque appareillage correspondant a une technique d'analyse soit implante dans une enceinte etanche. Les enceintes etanches sont reliees entre elles par un convoyeur. Apres trois annees de fonctionnement nous faisons le bilan et les critiques de l'installation. (auteurs)

  13. Statistically qualified neuro-analytic failure detection method and system

    Science.gov (United States)

    Vilim, Richard B.; Garcia, Humberto E.; Chen, Frederick W.

    2002-03-02

    An apparatus and method for monitoring a process involve development and application of a statistically qualified neuro-analytic (SQNA) model to accurately and reliably identify process change. The development of the SQNA model is accomplished in two stages: deterministic model adaption and stochastic model modification of the deterministic model adaptation. Deterministic model adaption involves formulating an analytic model of the process representing known process characteristics, augmenting the analytic model with a neural network that captures unknown process characteristics, and training the resulting neuro-analytic model by adjusting the neural network weights according to a unique scaled equation error minimization technique. Stochastic model modification involves qualifying any remaining uncertainty in the trained neuro-analytic model by formulating a likelihood function, given an error propagation equation, for computing the probability that the neuro-analytic model generates measured process output. Preferably, the developed SQNA model is validated using known sequential probability ratio tests and applied to the process as an on-line monitoring system. Illustrative of the method and apparatus, the method is applied to a peristaltic pump system.

  14. Generalized Pan-European Geological Database for Shallow Geothermal Installations

    Directory of Open Access Journals (Sweden)

    Johannes Müller

    2018-01-01

    Full Text Available The relatively high installation costs for different types of shallow geothermal energy systems are obstacles that have lowered the impact of geothermal solutions in the renewable energy market. In order to reduce planning costs and obtain a lithological overview of geothermal potentials and drilling conditions, a pan-European geological overview map was created using freely accessible JRC (Joint Research Centre data and ArcGIS software. JRC data were interpreted and merged together in order to collect information about the expenditure of installing geothermal systems in specific geological set-ups, and thereby select the most economic drilling technique. Within the four-year project of the European Union’s Horizon 2020 Research and Innovation Program, which is known as “Cheap-GSHPs” (the Cheap and efficient application of reliable Ground Source Heat exchangers and Pumps, the most diffused lithologies and corresponding drilling costs were analyzed to provide a 1 km × 1 km raster with the required underground information. The final outline map should be valid throughout Europe, and should respect the INSPIRE (INfrastructure for SPatial InfoRmation in Europe guidelines.

  15. Nuclear installations

    International Nuclear Information System (INIS)

    1998-01-01

    This document presents the fulfilling of the Brazilian obligations under the Convention on Nuclear Safety. The Chapter 2 of the document contains some details about the existing Brazilian nuclear installations. Also, safety improvements at Angra 1 and aspects of Angra 2 and 3 are reported

  16. Nuclear installations

    International Nuclear Information System (INIS)

    2001-01-01

    This document presents the fulfilling of the Brazilian obligations under the Convention on Nuclear Safety. The Chapter 2 of the document contains some details about the existing Brazilian nuclear installations. Also, safety improvements at Angra 1 and aspects of Angra 2 and 3 are reported

  17. Impact of Practice-Based Instruction on Graduate Programs in the Pharmaceutical Sciences--Another Response.

    Science.gov (United States)

    Gerald, Michael C.

    1979-01-01

    The impact of practice-based programs on graduate education in pharmaceutical science is discussed. It is suggested that graduate programs remain flexible in order to accommodate the role of the pharmacist-scientist and to help in attracting qualified students. (SF)

  18. 26 CFR 20.2039-2 - Annuities under “qualified plans” and section 403(b) annuity contracts.

    Science.gov (United States)

    2010-04-01

    ... 26 Internal Revenue 14 2010-04-01 2010-04-01 false Annuities under âqualified plansâ and section 403(b) annuity contracts. 20.2039-2 Section 20.2039-2 Internal Revenue INTERNAL REVENUE SERVICE... AUGUST 16, 1954 Gross Estate § 20.2039-2 Annuities under “qualified plans” and section 403(b) annuity...

  19. Competent person for radiation protection. Practical radiation protection for base nuclear installations and installations classified for the environment protection

    International Nuclear Information System (INIS)

    Pin, A.; Perez, S.; Videcoq, J.; Ammerich, M.

    2008-01-01

    This book corresponds to the practical module devoted to the base nuclear installations and to the installations classified for the environment protection, that is to say the permanent nuclear installations susceptible to present risks for the public, environment or workers. Complied with the legislation that stipulates this module must allow to apply the acquired theoretical training to practical situations of work, it includes seven chapters as follow: generalities on access conditions in regulated areas of nuclear installation,s or installations classified for environment protection and clothing against contamination; use of control devices and management of damaged situations; methodology of working place studies, completed by the application to a real case of a study on an intervention on a containment wall; a part entitled 'take stock of the situation' ends every chapter and proposes to the reader to check its understanding and acquisition of treated knowledge. (N.C.)

  20. Department of Defense (DOD) renewables and energy efficiency planning (REEP) program manual

    Energy Technology Data Exchange (ETDEWEB)

    Nemeth, R.J.; Fournier, D.; Debaillie, L.; Edgar, L.; Stroot, P.; Beasley, R.; Edgar, D.; McMillen, L.; Marren, M.

    1995-08-01

    The Renewables and Energy Efficiency Planning (REEP) program was developed at the US Army Construction Engineering Research Laboratories (USACERL). This program allows for the analysis of 78 energy and water conservation opportunities at 239 major DOD installations. REEP uses a series of algorithms in conjunction with installation specific data to estimate the energy and water conservation potential for entire installations. The program provides the energy, financial, pollution, and social benefits of conservation initiatives. The open architecture of the program allows for simple modification of energy and water conservation variables, and installation database values to allow for individualized analysis. The program is essentially a high-level screening tool that can be used to help identify and focus preliminary conservation studies. The REEP program requires an IBM PC or compatible with a 80386 or 80486 microprocessor. It also requires approximately 4 megabytes of disk space and at least 8 megabytes of RAM. The system was developed for a Windows environment and requires Microsoft Windows 3.1{trademark} or higher to run properly.

  1. 24 CFR 3280.709 - Installation of appliances.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 5 2010-04-01 2010-04-01 false Installation of appliances. 3280... Fuel Burning Systems § 3280.709 Installation of appliances. (a) The installation of each appliance... the manufacturer's instructions attached to the appliance. Every appliance shall be secured in place...

  2. 76 FR 75458 - Servicemembers' Group Life Insurance Traumatic Injury Protection Program-Genitourinary Losses

    Science.gov (United States)

    2011-12-02

    ... Traumatic Injury Protection Program--Genitourinary Losses AGENCY: Department of Veterans Affairs. ACTION... Protection (TSGLI) program by adding certain genitourinary (GU) system losses to the TSGLI Schedule of Losses and defining terms relevant to these new losses. This amendment is necessary to make qualifying GU...

  3. 14 CFR 171.159 - Installation requirements.

    Science.gov (United States)

    2010-01-01

    ... Installation requirements. (a) The facility must be installed according to accepted good engineering practices... must have a reliable source of suitable primary power, either from a power distribution system or...

  4. The Language of Literacy: A National Resource Directory of Aboriginal Literacy Programs.

    Science.gov (United States)

    Sabourin, Beverly; Globensky, Peter Andre

    This directory presents, in narrative form, core information about the operations of approximately 100 Aboriginal literacy programs throughout Canada. To qualify for inclusion in the directory, each program had to offer basic, functional, or advanced literacy training; offer literacy training in English, French, or an Aboriginal language; be…

  5. Groundwater quality monitoring well installation for Waste Area Groupings 8 and 9 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    Mortimore, J.A.; Ebers, M.L.

    1994-09-01

    This report documents the drilling and installation of nine groundwater quality monitoring (GQM) wells on the perimeter of Waste Area Grouping (WAG) 8 and two GQM wells on the perimeter of WAG 9. WAG 8 encompasses approximately 34 acres, most of which are located in Melton Valley. Irregular in shape, the site has two sinuous extensions from its northern end that contain the low-level radioactive waste (LLW) transfer lines. WAG 8 contains 22 solid waste management units (SWMUs) that can be divided into 4 groups. These groups include the High Flux Isotope Reactor/Transuranium Processing Facility waste collection basins, the LLW line leak sites, and the active LLW tanks. WAG 9 encompasses about 3 acres and is located west of the main portion of WAG 8 and south of Melton Valley Drive. WAG 9 contains four SWMUs. The wells in WAGs 8 and 9 were drilled and developed from June 1989 to March 1990. Monitoring wells were installed to characterize and assess the WAGs in accordance with applicable Department of Energy, state, and Environmental Protection Agency regulatory requirements. The purpose of the well installation program was to install GQM wells for groundwater characterization at WAGs 8 and 9. Data packages produced during installation activities by the ERCE hydrogeologists are an important product of the program. These packages document the well drilling, installation, and development activities and provide valuable data for well sampling and WAG characterization. The forms contained in the packages include predrilling and postdrilling checklists, drilling and construction logs, development and hydraulic conductivity records, and quality control-related documents

  6. Successful pipeline installation for Parque das Conchas development; Subsea installation

    Energy Technology Data Exchange (ETDEWEB)

    Bartz, Cesar

    2010-07-01

    Subsea 7 has successfully delivered again in Brazilian deep-waters. The subsea engineering and construction company has recently completed pipeline installation activities for the Parque das Conchas (BC-10) development, offshore Brazil. (AG)

  7. Preparation of qualified specialists for the field of it from D-Link

    Directory of Open Access Journals (Sweden)

    Pavel V. Romasevich

    2017-12-01

    Full Text Available The article is devoted to the consideration of D-Link's experience in the development and implementation of educational programs for the training of qualified specialists for the field of IT. To remain competitive, a specialist needs to be constantly trained, especially in such a rapidly changing field as IT. The training programs developed by D-Link for IT professionals help to gain knowledge about new technologies and their application in industrial conditions. You can confirm the high level of professionalism by getting the D-Link certificate. To obtain a certificate, you must pass one or two certification exams, depending on the chosen training course. Training of specialists engaged in the development, implementation and support of solutions based on D-Link solutions, in addition to the company's specialists, is carried out by authorized training centers and academic partners of D-Link. On the D-Link’s distance learning and certification portal, distance learning courses are available for studying. The article focuses on various forms of cooperation between D-Link and higher education institutions: the development of original teaching materials, the organization of distance learning and its integration into the learning process, the creation of laboratories to support practical classes and research activities, the management of course and diploma work, the organization of industrial practice.

  8. Advances and Challenges in the Implementation of DiD in Siting, Design, and Construction of Nuclear Installations in Vietnam

    Energy Technology Data Exchange (ETDEWEB)

    Nguyen, H.A., E-mail: nhanh@varans.vn [Vietnam Agency for Radiation and Nuclear Safety, Hanoi (Viet Nam)

    2014-10-15

    Vietnam is embarking on a development of a nuclear power program. The main focus is now on the initial 1000 MWe x 2 units of the nuclear power plant in Ninh Thuan province. Now, the nuclear projects of Vietnam are in the phase of siting approval and investment projects approval. The design assessment will be performed in 2013-2014; the construction and installation will be performed from now until the operating licensing is obtained in 2020-2021. With state of development of a nuclear power program in Vietnam, this paper only focuses on advances and challenges in the implementation of Defence in Depth (DID) in siting, design, and construction of nuclear installations in Vietnam. (author)

  9. 24 CFR 3286.203 - Installation license required.

    Science.gov (United States)

    2010-04-01

    ... performance of the installation work in compliance with the requirements of this part. (3) A license is not required for individuals working as direct employees of a licensed installer or for the company that... and competent performance of all employees working under the licensed installer's supervision and for...

  10. 46 CFR 181.520 - Installation and location.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Installation and location. 181.520 Section 181.520... TONS) FIRE PROTECTION EQUIPMENT Portable Fire Extinguishers § 181.520 Installation and location... the space being protected. The installation and location must be to the satisfaction of the Officer in...

  11. BROOKHAVEN: RHIC installation

    International Nuclear Information System (INIS)

    Anon.

    1994-01-01

    This summer, the first superconducting magnet was installed in 3.8 kilometre tunnel for Brookhaven's RHIC heavy ion collider (October, page 31). Manufactured by Northrop Grumman's Electronics and System Integration Division, the magnet is the first of RHIC's 373 dipoles. In addition to the dipoles, Northrop Grumman will also provide 432 RHIC quadrupoles. The first quadrupole was delivered on 8 April, a month before the first dipole arrived for onsite testing prior to installation. RHIC will need 1,700 superconducting magnets - dipoles, quadrupoles, sextupoles and correcting magnets, 1,200 of which will be built by industry and the rest built at Brookhaven. The 300 sextupoles are being supplied by Everson Electric

  12. A System Analysis of the Recruitment and Retention Problems Associated with the Program Manager for Chemical Demilitarization Organization

    National Research Council Canada - National Science Library

    Gottschalk, Laurence

    2001-01-01

    The primary purpose of this thesis is to investigate the problems of retaining qualified personnel in the Program Manager for Chemical Demilitarization organization through the end date of the program...

  13. Renewable energy water supply - Mexico program summary

    Energy Technology Data Exchange (ETDEWEB)

    Foster, R. [New Mexico State Univ., Las Cruces, NM (United States)

    1997-12-01

    This paper describes a program directed by the US Agency for International Development and Sandia National Laboratory which installed sustainable energy sources in the form of photovoltaic modules and wind energy systems in rural Mexico to pump water and provide solar distillation services. The paper describes the guidelines which appeared most responsible for success as: promote an integrated development program; install quality systems that develop confidence; instill local project ownership; train local industry and project developers; develop a local maintenance infrastructure; provide users training and operations guide; develop clear lines of responsibilities for system upkeep. The paper emphasizes the importance of training. It also presents much collected data as to the characteristics and performance of the installed systems.

  14. 46 CFR 58.10-10 - Diesel engine installations.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 2 2010-10-01 2010-10-01 false Diesel engine installations. 58.10-10 Section 58.10-10... MACHINERY AND RELATED SYSTEMS Internal Combustion Engine Installations § 58.10-10 Diesel engine installations. (a) The requirements of § 58.10-5 (a), (c), and (d) shall apply to diesel engine installations...

  15. Energy efficiency effect on the public street lighting by using LED light replacement and kwh-meter installation at DKI Jakarta Province, Indonesia

    Science.gov (United States)

    Sudarmono, Panggih; Deendarlianto; Widyaparaga, Adhika

    2018-05-01

    Public street lighting consumes large energy for the public interest, but many street lights still do not use energy-saving technologies. In 2014, Provincial Government of DKI Jakarta operated 179,305 units of street lights. Of the number of installed armature, 92 % of them or 166,441 units are HPS (High-Pressure Sodium) armatures which are inefficient. In 2016, the Provincial Government of DKI Jakarta cut down the energy used for street lighting, by implementing the programs of kWh-meter installation in every street lighting panel and use energy-saving lamps equipped with the smart system. The Provincial Government of DKI Jakarta is registered with 6,399 customer IDs in PLN (State Owned Electric Company), and gradually carried out the kWh Meter installation and changes to the contract. The program to use energy-saving lights done by replacing the HPS armature that is not energy efficient to LED armature which is known to be energy efficient. Until the end of 2016, the number of armatures that has been replaced was 89,417 units. The research results on 25 samples of PLN customer IDs and the replacement of 2,162 units armature, showed that the energy efficiency through kWh meter installation and armature replacement reduce the power consumption from 330,414 kWh to 71,278 kWh or by 78.43%. Generally, there was a decrease in the value of electricity bill compared to the before the replacement. The program of kWh-meter installations and replacement of the armature has a payback period of 2.66 years.

  16. 32 CFR 634.25 - Installation traffic codes.

    Science.gov (United States)

    2010-07-01

    ... 32 National Defense 4 2010-07-01 2010-07-01 true Installation traffic codes. 634.25 Section 634.25 National Defense Department of Defense (Continued) DEPARTMENT OF THE ARMY (CONTINUED) LAW ENFORCEMENT AND CRIMINAL INVESTIGATIONS MOTOR VEHICLE TRAFFIC SUPERVISION Traffic Supervision § 634.25 Installation traffic codes. (a) Installation or activit...

  17. Modern electrical installation for craft students

    CERN Document Server

    Scaddan, Brian

    2013-01-01

    Modern Electrical Installation for Craft Students, Volume 2, Third Edition discusses several topics concerning electrical installations. The book is comprised of eight chapters that deal with craft theory, associated subjects, and electrical industries. Chapter 1 covers inductors and inductance, while Chapter 2 tackles capacitors and capacitance. Chapter 3 deals with inductance and capacitance in installation work. The book also discusses cells, batteries, and transformers. The electrical industries, control and earthing, and testing are also dealt with. The last chapter discusses the basic el

  18. A study on the nuclear computer codes installation and management system

    International Nuclear Information System (INIS)

    Kim, Yeon Seung; Huh, Young Hwan; Kim, Hee Kyung; Kang, Byung Heon; Kim, Ko Ryeo; Suh, Soong Hyok; Choi, Young Gil; Lee, Jong Bok

    1990-12-01

    From 1987 a number of technical transfer related to nuclear power plant had been performed from C-E for YGN 3 and 4 construction. Among them, installation and management of the computer codes for YGN 3 and 4 fuel and nuclear steam supply system was one of the most important project. Main objectives of this project are to establish the nuclear computer code management system, to develop QA procedure for nuclear codes, to secure the nuclear code reliability and to extend techanical applicabilities including the user-oriented utility programs for nuclear codes. Contents of performing the project in this year was to produce 215 transmittal packages of nuclear codes installation including making backup magnetic tape and microfiche for software quality assurance. Lastly, for easy reference about the nuclear codes information we presented list of code names and information on the codes which were introduced from C-E. (Author)

  19. A novel method for coiled tubing installation

    Energy Technology Data Exchange (ETDEWEB)

    Simpson, Peter J. [2H Offshore, Houston, TX (United States); Tibbetts, David [Aquactic Engineering and Construction Ltd., Aberdeen (United Kingdom)

    2009-12-19

    Installation of flexible pipe for offshore developments is costly due to the physical cost of the flexible pipe, expensive day rates and the availability of suitable installation vessels. Considering the scarcity of flexible pipe in today's increasingly demanding and busy market, operators are seeking a cost effective solution for installing piping in a range of water depths using vessels which are readily on hand. This paper describes a novel approach to installing reeled coiled tubing, from 1 inch to 5 inch diameter, from the back of a small vessel in water depths from 40 m up to around 1000 m. The uniqueness of the system is the fact that the equipment design is modular and compact. This means that when disassembled, it fits into standard 40 ft shipping containers, and the size allows it to be installed on even relatively small vessels of opportunity, such as anchor handling or installation vessels, from smaller, and cheaper quay side locations. Such an approach is the ideal solution to the problem faced by operators, in that it allows the installation of cheaper, readily available coiled tubing, from cost-effective vessels, which do not need to transit to a pick up the system. (author)

  20. Presentation of the Vulcano installation which uses a plasma transferred arc rotary furnace for corium melting; Utilisation d`un four tournant a arc plasma transfere pour fondre et couler des melanges d`oxydes autour de 2000 C. Presentation du film Vulcano

    Energy Technology Data Exchange (ETDEWEB)

    Cognet, G.; Laffont, G.; Jegou, C.; Pierre, J.; Journeau, C.; Sudreau, F.; Roubaud, A. [CEA Cadarache, 13 - Saint-Paul-lez-Durance (France). Dept. d`Etudes des Reacteurs

    1998-06-01

    In the case of loss coolant accident, the reactor core could melt and turn into a mixture of uranium oxides, zirconium, iron and steel called corium. A large experimental program has been launched to study corium behaviour, to qualify solutions to stabilize it and to confine it in the reactor containment. The Vulcano installation has been designed to that purpose. It is made up of: i) a plasma transferred arc rotary furnace, ii) a testing surface covered with refractory materials, iii) an induction heating system in order to simulate the residual power of corium, iv) instrumentation devices such as video cameras, thermocouples, infra-red pyrometers and flowmeters, and v) a laboratory to perform chemical analysis of corium samples. The first experimental results show that a mixture of corium and concrete spreads better than expected. It seems that a low initial height of matter can produce a great distance flowing while having a chaotic behaviour. This characteristic suggests that the mixture acts as a Bingham type threshold fluid. (A.C.) 5 refs.

  1. Towards a Framework for Projection Installations

    DEFF Research Database (Denmark)

    Halskov, Kim; Falck, Hans William

    2013-01-01

    Projection installations are part of Spatially Augmented Reality, where the projection medium is used to enrich a fixed, bounded physical space with digital content. Projection technology enables us to turn many kinds of physical objects into displays. In this paper we develop and present...... a conceptual framework that addresses three aspects of a projection installation: the contentassociated with the object, the digital content, and the relation between the two. We conclude the paper with a set of strategies commonly used in projection installations: Enhancing or emphasizing physical aspects......; Transforming materiality; Adding virtual objects; 3D effects; Complex content on simple objects or simple content on complex; Strong versus loose connections between the physical object and the digital content. This paper is based on four cases, two of which concern cultural heritage installations, the others...

  2. Lietojumprogrammu instalāciju izveides risinājumi

    OpenAIRE

    Zālītis, Mārtiņš

    2010-01-01

    Bakalaura darbā „Lietojumprogrammu instalāciju izveides risinājumi” mērķis ir izanalizēt lietotājam draudzīgas un nedraudzīgas instalācijas, kā arī salīdzināt instalāciju veidošanas rīkus, norādot uz to stiprajām un vājajām pusēm. Lai izpētītu instalāciju izveides iespējas tiek izmantota tīmeklī pieejamā informācija, autora darbs ar instalāciju rīkiem un to novērtējums. Parādīta sarežģītas instalācijas uzbūve, kas izveidota ar NSIS instalāciju rīku, kuru arī autors atzīst par labāko risinājum...

  3. The impact of green stormwater infrastructure installation on surrounding health and safety.

    Science.gov (United States)

    Kondo, Michelle C; Low, Sarah C; Henning, Jason; Branas, Charles C

    2015-03-01

    We investigated the health and safety effects of urban green stormwater infrastructure (GSI) installments. We conducted a difference-in-differences analysis of the effects of GSI installments on health (e.g., blood pressure, cholesterol and stress levels) and safety (e.g., felonies, nuisance and property crimes, narcotics crimes) outcomes from 2000 to 2012 in Philadelphia, Pennsylvania. We used mixed-effects regression models to compare differences in pre- and posttreatment measures of outcomes for treatment sites (n=52) and randomly chosen, matched control sites (n=186) within multiple geographic extents surrounding GSI sites. Regression-adjusted models showed consistent and statistically significant reductions in narcotics possession (18%-27% less) within 16th-mile, quarter-mile, half-mile (P<.001), and eighth-mile (P<.01) distances from treatment sites and at the census tract level (P<.01). Narcotics manufacture and burglaries were also significantly reduced at multiple scales. Nonsignificant reductions in homicides, assaults, thefts, public drunkenness, and narcotics sales were associated with GSI installation in at least 1 geographic extent. Health and safety considerations should be included in future assessments of GSI programs. Subsequent studies should assess mechanisms of this association.

  4. Lessons learned from installation of an environmental horizontal well

    International Nuclear Information System (INIS)

    Oakley, D.B.; Nickelson, M.D.

    1994-01-01

    At Williams Air Force Base near Phoenix, Arizona, a Pilot Study/Demonstration Study is being performed to evaluate the effectiveness of horizontal vs vertical wells in remediating and containing a jet fuel contaminant plume. An early stage of this project included successful installation of the world's longest, deepest environmental horizontal well. The horizontal well was installed using river crossing technology developed for drilling boreholes and installing utility conduits under rivers. Boreholes more than 5,000 ft. long have been successfully installed using river crossing technology. However, these boreholes are typically shallower than 100 ft. below land surface. Installation of the environment horizontal well proved to be extremely challenging because of the depth, the length of the borehole, and the requirements dictated by well installation criteria. Two installation attempts failed before the successful installation. The first installation attempt failed during well material installation. The second attempt resulted in the drill string becoming permanently stuck and abandoned downhole. The history of the two failed and one successful installation attempts demonstrates several lessons learned, including (1) streamline the well materials installation process as much as possible; (2) guar-gum-based drilling muds do not have the gel strength to remove sufficient cuttings from deep boreholes; (3) if sandpack around the well screen is required, a prepack screen should be installed--avoid using tremie pipes for installing a sandpack; (4) drill string location information provided by surface magnetic systems is unreliable at 150 ft. or more bls; and (5) for difficult drilling conditions, 24 hr./day drilling is recommended

  5. Hydro-Quebec's 'Econo-Confort' program. A unique energy-conservation measure

    International Nuclear Information System (INIS)

    Dunn, R.

    1996-01-01

    In December 1993, Hydro-Quebec launched an ambitious direct installation program known to the public as Econo-Confort. The program is aimed at reducing electricity consumption by residential customers. In the period 1994-1997, Econo-Confort representatives will visit Quebec's 2,8 million homes individually and offer to install energy-saving products such as electronic thermostats and low-flow shower-heads, at no charge to customers. The program's objectives are astronomical: 8 million thermostats and 800,000 shower-heads will be installed in 1.1 million households, for total energy savings of 2,010 GWh. Planning such an extensive operation demanded an equally extensive performance analysis, covering the technology, consumer behaviour and commercial strategy aspects. (author)

  6. Regulatory guides for qualifying the calculation methodology of Furnas by CNEN

    International Nuclear Information System (INIS)

    1987-10-01

    Regulatory guides are presented which will be used for qualifying the calculation methodology of FURNAS by CNEN, in the areas of Neutronics, Thermohydraulics, Accident Analysis and Fuel Rod Performance, as applied to Angra 1 NPP. (Author) [pt

  7. Qualified and Unqualified (N-R C) mental health nursing staff--minor differences in sources of stress and burnout. A European multi-centre study.

    Science.gov (United States)

    Sorgaard, Knut W; Ryan, Peter; Dawson, Ian

    2010-06-14

    Unqualified/non-registered caregivers (N-R Cs) will continue to play important roles in the mental health services. This study compares levels of burnout and sources of stress among qualified and N-R Cs working in acute mental health care. A total of 196 nursing staff --124 qualified staff (mainly nurses) and 72 N-R Cs with a variety of different educational backgrounds--working in acute wards or community mental teams from 5 European countries filled out the Maslach Burnout Inventory (MBI), the Mental Health Professional Scale (MHPSS) and the Psychosocial Work Environment and Stress Questionnaire (PWSQ). (a) The univariate differences were generally small and restricted to a few variables. Only Social relations (N-R Cs being less satisfied) at Work demands (nurses reporting higher demands) were different at the .05 level. (b) The absolute scores both groups was highest on variables that measured feelings of not being able to influence a work situation characterised by great demands and insufficient resources. Routines and educational programs for dealing with stress should be available on a routine basis. (c) Multivariate analyses identified three extreme groups: (i) a small group dominated by unqualified staff with high depersonalization, (ii) a large group that was low on depersonalisation and high on work demands with a majority of qualified staff, and (iii) a small N-R C-dominated group (low depersonalization, low work demands) with high scores on professional self-doubt. In contrast to (ii) the small and N-R C-dominated groups in (i) and (iii) reflected mainly centre-dependent problems. The differences in burnout and sources of stress between the two groups were generally small. With the exception of high work demands the main differences between the two groups appeared to be centre-dependent. High work demands characterized primarily qualified staff. The main implication of the study is that no special measures addressed towards N-R Cs in general with regard

  8. Measurement methods and accuracy analysis of Chang'E-5 Panoramic Camera installation parameters

    Science.gov (United States)

    Yan, Wei; Ren, Xin; Liu, Jianjun; Tan, Xu; Wang, Wenrui; Chen, Wangli; Zhang, Xiaoxia; Li, Chunlai

    2016-04-01

    Chang'E-5 (CE-5) is a lunar probe for the third phase of China Lunar Exploration Project (CLEP), whose main scientific objectives are to implement lunar surface sampling and to return the samples back to the Earth. To achieve these goals, investigation of lunar surface topography and geological structure within sampling area seems to be extremely important. The Panoramic Camera (PCAM) is one of the payloads mounted on CE-5 lander. It consists of two optical systems which installed on a camera rotating platform. Optical images of sampling area can be obtained by PCAM in the form of a two-dimensional image and a stereo images pair can be formed by left and right PCAM images. Then lunar terrain can be reconstructed based on photogrammetry. Installation parameters of PCAM with respect to CE-5 lander are critical for the calculation of exterior orientation elements (EO) of PCAM images, which is used for lunar terrain reconstruction. In this paper, types of PCAM installation parameters and coordinate systems involved are defined. Measurement methods combining camera images and optical coordinate observations are studied for this work. Then research contents such as observation program and specific solution methods of installation parameters are introduced. Parametric solution accuracy is analyzed according to observations obtained by PCAM scientifically validated experiment, which is used to test the authenticity of PCAM detection process, ground data processing methods, product quality and so on. Analysis results show that the accuracy of the installation parameters affects the positional accuracy of corresponding image points of PCAM stereo images within 1 pixel. So the measurement methods and parameter accuracy studied in this paper meet the needs of engineering and scientific applications. Keywords: Chang'E-5 Mission; Panoramic Camera; Installation Parameters; Total Station; Coordinate Conversion

  9. Importance of human factors on nuclear installations safety

    International Nuclear Information System (INIS)

    Caruso, G.J.

    1990-01-01

    Actually, installations safety and, in particular the nuclear installations infer a strong incidence in human factors related to the design and operation of such installations. In general, the experience aims to that the most important accidents have happened as result of the components' failures combination and human failures in the operation of safety systems. Human factors in the nuclear installations may be divided into two areas: economy and human reliability. Human factors treatments for the safety evaluation of the nuclear installations allow to diagnose the weak points of man-machine interaction. (Author) [es

  10. Space Qualified Non-Destructive Evaluation and Structural Health Monitoring Technology, Phase I

    Data.gov (United States)

    National Aeronautics and Space Administration — NextGen Aeronautics is proposing an innovative space qualified non-destructive evaluation and health monitoring technology. The technology is built on concepts...

  11. Health physics educational program in the Tennessee Valley Authority

    International Nuclear Information System (INIS)

    Holley, Wesley L.

    1978-01-01

    In the spring of 1977, the Radiological Hygiene Branch of the Tennessee Valley Authority (TVA) instituted a training program for health physics technicians to ensure availability of qualified personnel for the agency, which is rapidly becoming the world's largest nuclear utility. From this, a health physics education program is developing to also include health physics orientation and retraining for unescorted entry into nuclear power plants, health physics training for employees at other (non-TVA) nuclear plants, specialized health physics training, and possibly theoretical health physics courses to qualify technician-level personnel for professional status. Videotaped presentations are being used extensively, with innovations such as giving examinations by videotape of real-life, in-plant experiences and acted out scenarios of health physics procedures; and teaching health physics personnel to observe, detect, and act on procedural, equipment, and personnel deficiencies promptly. Video-taped lectures are being used for review and to complement live lectures. Also, a 35-mm slide and videotape library is being developed on all aspects of the operational health physics program for nuclear plants using pressurized and boiling water reactors. (author)

  12. Installation of the LHC transfer lines begins

    CERN Multimedia

    Patrice Loïez

    2003-01-01

    The first of 700 magnets has been installed in one of the two transfer tunnels built to transfer the SPS beam into the LHC. The start of this first installation phase of the LHC transfer lines provides the opportunity to launch a new and highly original modular system for transporting and installing all kinds of magnets in very narrow tunnels. The system is based on very compact bogies, up to four of which can be coupled together to form a convoy. The wheels are fitted with individual motors enabling them to swivel through an angle of 90° and the convoy to move laterally. The first installation phase will continue until mid-April. In addition to the magnets, a beam dump facility also has to be installed. The second installation phase will take place later this year and should be completed in 2004, when the TI 8 transfer line is due to be tested. The second transfer line, in tunnel TI 2, should be ready in April 2007, once the LHC magnets have been transported through the downstream section of this tunnel.Pho...

  13. Installation of the LHC transfer lines begins

    CERN Multimedia

    Patrice Loïez

    2003-01-01

    The first of 700 magnets has been installed in one of the two transfer tunnels built to transfer the SPS beam into the LHC. The start of this first installation phase of the LHC transfer lines provides the opportunity to launch a new and highly original modular system for transporting and installing all kinds of magnets in very narrow tunnels. The system is based on very compact bogies, up to four of which can be coupled together to form a convoy. The wheels are fitted with individual motors enabling them to swivel through an angle of 90° and the convoy to move laterally. The first installation phase will continue until mid-April. In addition to the magnets, a beam dump facility also has to be installed. The second installation phase will take place later this year and should be completed in 2004, when the TI 8 transfer line is due to be tested. The second transfer line, in tunnel TI 2, should be ready in April 2007, once the LHC magnets have been transported through the downstream section of this tunnel. Th...

  14. Installation of the LHC transfer lines begins

    CERN Multimedia

    Patrice Loïez

    2003-01-01

    The first of 700 magnets has been installed in one of the two transfer tunnels built to transfer the SPS beam into the LHC. The start of this first installation phase of the LHC transfer lines provides the opportunity to launch a new and highly original modular system for transporting and installing all kinds of magnets in very narrow tunnels. The system is based on very compact bogies, up to four of which can be coupled together to form a convoy. The wheels are fitted with individual motors enabling them to swivel through an angle of 90° and the convoy to move laterally. The first installation phase will continue until mid-April. In addition to the magnets, a beam dump facility also has to be installed. The second installation phase will take place later this year and should be completed in 2004, when the TI 8 transfer line is due to be tested. The second transfer line, in tunnel TI 2, should be ready in April 2007, once the LHC magnets have been transported through the downstream section of this tunnel. We...

  15. Performance evaluation of buried pipe installation.

    Science.gov (United States)

    2010-05-01

    The purpose of this study is to determine the effects of geometric and mechanical parameters characterizing the soil structure interaction developed in a buried pipe installation located under roads/highways. The drainage pipes or culverts installed ...

  16. 12 CFR 24.6 - Examples of qualifying public welfare investments.

    Science.gov (United States)

    2010-01-01

    ... 12 Banks and Banking 1 2010-01-01 2010-01-01 false Examples of qualifying public welfare investments. 24.6 Section 24.6 Banks and Banking COMPTROLLER OF THE CURRENCY, DEPARTMENT OF THE TREASURY... finance small businesses or small farms, including minority- and women-owned small businesses or small...

  17. 77 FR 9846 - Source of Income From Qualified Fails Charges

    Science.gov (United States)

    2012-02-21

    ... temporary regulations noted that no trading practice existed at that time for fails charges on securities other than Treasuries, but that if a fails charge trading practice pertaining to other securities was... sources within the United States, and the income from the qualified fails charge is treated as effectively...

  18. Fuel followed control rod installation at AFRRI

    International Nuclear Information System (INIS)

    Moore, Mark; Owens, Chris; Forsbacka, Matt

    1992-01-01

    Fuel Followed Control Rods (FFCRs) were installed at the Armed Forces Radiobiology Research Institute's 1 MW TRIGA Reactor. The procedures for obtaining, shipping, and installing the FFCRs is described. As part of the FFCR installation, the transient rod drive was relocated. Core performance due to the addition of the fuel followed control rods is discussed. (author)

  19. Professional paradox: identity formation in qualified doctors pursuing further training.

    Science.gov (United States)

    Chan, Mercedes; Pratt, Dan; Poole, Gary; Sidhu, Ravi

    2018-03-01

    Many newly qualified specialists and subspecialists pursue additional training. Although their motivations are many, the pursuit of further training as an alternative to unemployment is an emerging trend. Paradoxically, doctors continue as trainees with a consultant's credentials, and without the guarantee of eventual employment. This study explores seven doctors' experiences, the effects of further training on their professional identity formation (PIF), and how these effects are reconciled on a personal and professional level. This phenomenological study involved interviews with seven qualified Canadian specialists (three were female) who pursued additional training in response to a lack of available positions in their respective specialties. Template analysis generated theoretical constructs of influences on their PIF, and characteristics of their lived experiences. Four themes shaped PIF: setting and context; language and communication; responsibilities and privileges; and participants' visions of their future selves. Professional identity formation (PIF) continued to develop in further training, but was inconsistently affirmed by participants' communities of practice. Four major themes characterised training experiences: prescription; managing multiple masters; limiting access to others and community ties; and constantly questioning the value of extra training. Qualified doctors traverse professional paradoxes as they seek further education with no guarantee of employment and provide consultant-level care as 'trainees'. An identity dissonance emerges that may continue until a clear identity is prescribed for them. Although disruptive to these doctors' PIF and personal and professional lives, the long-term effects of additional training are unknown. Its utility and influence on securing employment and future job satisfaction are areas for further research. © 2017 John Wiley & Sons Ltd and The Association for the Study of Medical Education.

  20. The insurance of nuclear installations

    International Nuclear Information System (INIS)

    Francis, H.W.

    1977-01-01

    A brief account is given of the development of nuclear insurance. The subject is dealt with under the following headings: the need for nuclear insurance, nuclear insurance pools, international co-operation, nuclear installations which may be insured, international conventions relating to the liability of operators of nuclear installations, classes of nuclear insurance, nuclear reactor hazards and their assessment, future developments. (U.K.)

  1. VERA 3.5 Installation Guide

    Energy Technology Data Exchange (ETDEWEB)

    Bartlett, Roscoe A. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Baird, Mark L. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Berrill, Mark A. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Kulesza, Joel A. [Univ. of Michigan, Ann Arbor, MI (United States); Mervin, Brenden T. [Electric Power Research Inst. (EPRI), Charlotte, NC (United States)

    2016-08-16

    This guide describes the structure and setup of the standard VERA development environment (VERA Dev Env) and standard VERA Third Party Libraries (TPLs) that need to be in place before installing many of the VERA simulation components. It describes everything from the initial setup on a new machine to the final build, testing, and installation of VERA components. The goal of this document is to describe how to create the directories and contents outlined in Standard VERA Dev Env Directory Structure and then obtain the remaining VERA source and build, test, and install any of the necessary VERA components on a given system. This document describes the process both for a development version of VERA and for a released tarball of the VERA sources.

  2. VERA 3.5 Installation Guide

    International Nuclear Information System (INIS)

    Bartlett, Roscoe A.; Baird, Mark L.; Berrill, Mark A.; Kulesza, Joel A.; Mervin, Brenden T.

    2016-01-01

    This guide describes the structure and setup of the standard VERA development environment (VERA Dev Env) and standard VERA Third Party Libraries (TPLs) that need to be in place before installing many of the VERA simulation components. It describes everything from the initial setup on a new machine to the final build, testing, and installation of VERA components. The goal of this document is to describe how to create the directories and contents outlined in Standard VERA Dev Env Directory Structure and then obtain the remaining VERA source and build, test, and install any of the necessary VERA components on a given system. This document describes the process both for a development version of VERA and for a released tarball of the VERA sources.

  3. Field installation and maintenance

    International Nuclear Information System (INIS)

    Prebble, R.E.

    1981-01-01

    The use of a neutron moisture meter for the determination of the water content of soil necessitates the installation of an access tube down which the probe can be lowered. Errors in neutron count rate will be introduced if water enters the air gap between a loose fitting tube and the soil. Errors may also be caused by changes in the soil structure resulting from the techniques for soil removal and from driving the access hole. Access tube materials and dimensions, methods of installation and maintenance of the site are discussed

  4. Qualifying cogeneration in Texas and Louisiana

    International Nuclear Information System (INIS)

    Jenkins, S.C.; Cabe, R.; Stauffaeher, J.J.

    1992-01-01

    This paper reports that cogeneration of electricity and useful thermal energy by industrials along the Gulf Coast grew significantly more rapidly than in other parts of the country during and immediately following World War II as a result of the concentration of chemical and plastics processing facilities there. In 1982, Texas passed its version of PURPA, the Public Utility Regulatory Act (PURA) and designated those non-utility generators from which public utilities must purchase electricity as Qualifying Cogenerators. In 1991, there were nearly 7,500 MW of QF power generated for inside-the-fence use or firm capacity sale to utilities, with the two largest utilities in Texas purchasing over half that amount

  5. Demonstration of a utility industry horizontal drilling system: Horizontal well AMH-5 installation report

    International Nuclear Information System (INIS)

    1992-01-01

    The Department of Energy's Office of Technology Development initiated an integrated demonstration of innovative technologies and systems for cleanup of VOCs in soils and groundwater at the Savannah River Site (SRS) in 1989. The overall goal of the program is demonstration of multiple technologies and systems in the fields of drilling, characterization, monitoring, and remediation at a single test bed. Innovative technologies are compared to one another and to baseline technologies in terms of technical performance and cost effectiveness. Transfer of successfully demonstrated technologies and systems to DOE environmental restoration organizations, to other government agencies, and to industry is a critical part of the program. Directional drilling has been shown to be a successful technique for enhancing access to the subsurface, thus improving remediation systems, especially remediation systems which perform in situ. Demonstration of an innovative directional drilling system at the Integrated Demonstration Site at the SRS, was initiated in June of 1992. The directional drilling system was designed to install an in situ remediation system. The drilling system is an experimental compaction/dry drilling technique developed by Charles Machine Works (Ditch Witch reg-sign) of Perry, Oklahoma. A horizontal well was installed in the M Area of the SRS below and parallel to an abandoned tile process sewer line. The installation of the horizontal well was a two-part process. Part one consisted of drilling the borehole, and part two was the horizontal well completion

  6. RETRAN-02 installation and verification for the CRAY computer

    International Nuclear Information System (INIS)

    1990-03-01

    The RETRAN-02 transient thermal-hydraulic analysis program developed by the Electric Power Research Institute (EPRI) has been selected as a tool for use in assessing the operation and safety of the SP-100 space reactor system being developed at Los Alamos National Laboratory (LANL). The released versions of RETRAN-02 are not operational on CRAY computer systems which are the primary mainframes in use at LANL requiring that the code be converted to the CRAY system. This document describes the code conversion, installation, and validation of the RETRAN-02/MOD004 code on the LANL CRAY computer system

  7. Seismic studies for nuclear installations sites

    International Nuclear Information System (INIS)

    Mohammadioun, B.; Faure, J.

    1988-01-01

    The french experience in seismic risks assessment for french nuclear installations permits to set out the objectives, the phases the geographic extensions of workings to be realized for the installation safety. The data to be collected for the safety analysis are specified, they concern the regional seismotectonics, the essential seismic data for determining the seism level to be taken into account and defining the soil movement spectra adapted to the site. It is necessary to follow up the seismic surveillance during the installation construction and life. 7 refs. (F.M.)

  8. Installation for producing sealed radioactive sources

    International Nuclear Information System (INIS)

    Fradin, J.; Hayoun, C.

    1969-01-01

    This installation has been designed and built for producing sealed sources of fission elements: caesium 137, strontium 90, promethium 147, ruthenium 106 and cerium 144 in particular. The installation consists of sealed and protected cells, each being assigned to a particular production. The safety and the operational reliability of the equipment are the principal considerations which have governed this work. The report describes the installation and, in particular, the apparatus used as well as the various control devices. In conclusion, a review as presented of six years operation. (authors) [fr

  9. Pedagogical characteristics of the systems for assessing the technical and tactical skills of qualified volleyball players

    Directory of Open Access Journals (Sweden)

    Мykhailo Oliinyk

    2017-12-01

    Full Text Available Purpose: on the basis of the analysis of the special literature and their own experimental studies, to determine the characteristics of the systems for assessing the technical and tactical skills of qualified volleyball players. Material & Methods: study was conducted on the basis of the material of the national team of Zaporozhye State Medical University on volleyball. Analysis and generalization of the data of scientific and methodical literature are used; registration, analysis and interpretation of indicators of technical and tactical actions of qualified volleyball players in training and competitive processes; pedagogical observations; algorithms for calculating the quantitative and qualitative indicators of technical and tactical skill in volleyball; methods of mathematical statistics. Results: data on the existence of a strong statistical relationship between the systems of assessment of technical and tactical skills of qualified volleyball players, taking into account the specificity of the game role. Conclusion: shows the specifics of the application of various systems for assessing the technical and tactical skills of qualified volleyball players, taking into account the factors of the game role, noted the methodological features of special analysis and interpretation of indicators of technical and tactical actions in the adversarial process.

  10. Improvement program of state supervision system for radioactive and nuclear installations

    International Nuclear Information System (INIS)

    Cardenas, J.

    1993-01-01

    The current program begins as part of a policy to take care of the development of the cuban nuclear program and with the objective of improving the state supervision system of nuclear and radioactive facilities on the basis of the national experience, good skills internationally accepted and taking into account IAEA recommendations. The program develops the following topics: reorientation and restructure of state supervision, review of the current nuclear legislature, update of regulations of facility safety and qualification and training of state supervision personnel

  11. NRC/RSR Data Bank Program

    International Nuclear Information System (INIS)

    Bankert, S.F.; Evans, C.D.; Hardy, H.A.; Litteer, G.L.; Schulz, G.L.; Smith, N.C.

    1978-01-01

    The United States Nuclear Regulatory Commission (NRC) has established the NRC/Reactor Safety Research (RSR) Data Bank Program to provide a means of collecting, processing, and making available experimental data from the many domestic and foreign water reactor safety research programs. The NRC/RSR Data Bank Program collects qualified engineering data from experimental program data bases, stores the data in a single data bank in a common format, and makes the data available to users. The program is designed to be user oriented to minimize the effort required to obtain and manipulate data of interest. The data bank concept and structure embodied in the data bank processing system are applicable to any program where large quantities of scientific (numeric) data are generated and require compiling, storage, and accessing in order to be collected and made available to multiple users. 3 figures

  12. Lessons Learned on University Education Programs of Chemical Engineering Principles for Nuclear Plant Operations - 13588

    International Nuclear Information System (INIS)

    Ryu, Jun-hyung

    2013-01-01

    University education aims to supply qualified human resources for industries. In complex large scale engineering systems such as nuclear power plants, the importance of qualified human resources cannot be underestimated. The corresponding education program should involve many topics systematically. Recently a nuclear engineering program has been initiated in Dongguk University, South Korea. The current education program focuses on undergraduate level nuclear engineering students. Our main objective is to provide industries fresh engineers with the understanding on the interconnection of local parts and the entire systems of nuclear power plants and the associated systems. From the experience there is a huge opportunity for chemical engineering disciple in the context of giving macroscopic overview on nuclear power plant and waste treatment management by strengthening the analyzing capability of fundamental situations. (authors)

  13. Formation in radiological protection of the personnel of sanitary installations in Peru

    International Nuclear Information System (INIS)

    Medina G, E.

    2006-01-01

    All the people that work with ionizing radiations should have a singular license according to that settled down in the effective legal standards in force in Peru. This authorization is granted by the Peruvian Institute of Nuclear Energy (IPEN) after the postulant demonstrates that he can work in sure form in the application where it uses ionizing radiations. From 1972 the Superior Center of Nuclear Studies (CSEN) of the IPEN it has carried out diverse training courses on radiological safety and protection in medicine, industry and research, such it is so until the year 2005 it has organized 458 courses where 5872 people have been qualified in the country. 75% of people was qualified in the period 2000 - 2005. The courses are organized according to the specific work with radiations and in the one case of medical radiodiagnostic, dental radiology, nuclear medicine and radiotherapy has been qualified 2337 people (doctors, medical technicians and technicians) by means of 174 courses made among the years 2000 at the 2005, corresponding 69,75% to people qualified in radiological protection in medical radiodiagnostic. (Author)

  14. Biggest semiconductor installed

    CERN Multimedia

    2008-01-01

    Scientists and technicians at the European Laboratory for Particle Physics, commonly known by its French acronym CERN (Centre Europen pour la Recherche Nuclaire), have completed the installation of the largest semiconductor silicon detector.

  15. Influence of particle and surface quality on the vitrinite reflectance of dispersed organic matter: Comparative exercise using data from the qualifying system for reflectance analysis working group of ICCP

    Science.gov (United States)

    Borrego, A.G.; Araujo, C.V.; Balke, A.; Cardott, B.; Cook, A.C.; David, P.; Flores, D.; Hamor-Vido, M.; Hiltmann, W.; Kalkreuth, W.; Koch, J.; Kommeren, C.J.; Kus, J.; Ligouis, B.; Marques, M.; Mendonca, Filho J.G.; Misz, M.; Oliveira, L.; Pickel, W.; Reimer, K.; Ranasinghe, P.; Suarez-Ruiz, I.; Vieth, A.

    2006-01-01

    The development of a qualifying system for reflectance analysis has been the scope of a working group within the International Committee for Coal and Organic Petrology (ICCP) since 1999, when J. Koch presented a system to qualify vitrinite particles according to their size, proximity to bright components and homogeneity of the surface. After some years of work aimed at improving the classification system using photomicrographs, it was decided to run a round robin exercise on microscopy samples. The classification system tested consists of three qualifiers ranging from excellent to low quality vitrinites with an additional option for unsuitable vitrinites. This paper reports on the results obtained by 22 analysts who were asked to measure random reflectance readings on vitrinite particles assigning to each reading a qualifier. Four samples containing different organic matter types and a variety of vitrinite occurrences have been analysed. Results indicated that the reflectance of particles classified as excellent, good or poor compared to the total average reflectance did not show trends to be systematically lower or higher for the four samples analysed. The differences in reflectance between the qualifiers for any given sample were lower than the scatter of vitrinite reflectance among participants. Overall, satisfactory results were obtained in determining the reflectance of vitrinite in the four samples analysed. This was so for samples having abundant and easy to identify vitrinites (higher plant-derived organic matter) as well as for samples with scarce and difficult to identify particles (samples with dominant marine-derived organic matter). The highest discrepancies were found for the organic-rich oil shales where the selection of the vitrinite population to measure proved to be particularly difficult. Special instructions should be provided for the analysis of this sort of samples. The certainty of identification of the vitrinite associated with the vitrinite

  16. First ALICE detectors installed!

    CERN Multimedia

    2006-01-01

    Detectors to track down penetrating muon particles are the first to be placed in their final position in the ALICE cavern. The Alice muon spectrometer: in the foreground the trigger chamber is positioned in front of the muon wall, with the dipole magnet in the background. After the impressive transport of its dipole magnet, ALICE has begun to fill the spectrometer with detectors. In mid-July, the ALICE muon spectrometer team achieved important milestones with the installation of the trigger and the tracking chambers of the muon spectrometer. They are the first detectors to be installed in their final position in the cavern. All of the eight half planes of the RPCs (resistive plate chambers) have been installed in their final position behind the muon filter. The role of the trigger detector is to select events containing a muon pair coming, for instance, from the decay of J/ or Y resonances. The selection is made on the transverse momentum of the two individual muons. The internal parts of the RPCs, made o...

  17. Determination of installation capacity in reservoir hydro-power plants considering technical, economical and reliability indices

    DEFF Research Database (Denmark)

    Hosseini, S.M.H.; Forouzbakhsh, Farshid; Fotouh-Firuzabad, Mahmood

    2008-01-01

    One of the most important issues in planning the ‘‘reservoir” type of hydro-power plants (HPP) is to determine the installation capacity of the HPPs and estimate its annual energy value. In this paper, a method is presented. A computer program has been developed to analyze energy calculation...

  18. Using GIS to evaluate a fire safety program in North Carolina.

    Science.gov (United States)

    Dudley, Thomas; Creppage, Kathleen; Shanahan, Meghan; Proescholdbell, Scott

    2013-10-01

    Evaluating program impact is a critical aspect of public health. Utilizing Geographic Information Systems (GIS) is a novel way to evaluate programs which try to reduce residential fire injuries and deaths. The purpose of this study is to demonstrate the application of GIS within the evaluation of a smoke alarm installation program in North Carolina. This approach incorporates national fire incident data which, when linked with program data, provides a clear depiction of the 10 years impact of the Get Alarmed, NC! program and estimates the number of potential lives saved. We overlapped Get Alarmed, NC! program installation data with national information on fires using GIS to identify homes that experienced a fire after an alarm was installed and calculated potential lives saved based on program documentation and average housing occupancy. We found that using GIS was an efficient and quick way to match addresses from two distinct sources. From this approach we estimated that between 221 and 384 residents were potentially saved due to alarms installed in their homes by Get Alarmed, NC!. Compared with other program evaluations that require intensive and costly participant telephone surveys and/or in-person interviews, the GIS approach is inexpensive, quick, and can easily analyze large disparate datasets. In addition, it can be used to help target the areas most at risk from the onset. These benefits suggest that by incorporating previously unutilized data, the GIS approach has the potential for broader applications within public health program evaluation.

  19. Changes in sickness absenteeism following the introduction of a qualifying day for sickness benefit--findings from Sweden Post

    DEFF Research Database (Denmark)

    Voss, M; Floderus, B; Diderichsen, F

    2001-01-01

    AIMS: In 1993, a qualifying day without sickness benefit was introduced to the Swedish sickness benefit system. The aim of the present study is to investigate sickness absenteeism before and after the introduction of the qualifying day, in the light of conditions inside and outside working life....... METHODS: The study was based on 1,952 female and 2,229 male employees of Sweden Post. Sickness absence was measured by sickness incidence one year before and one year after the introduction of the qualifying day (sick-leave events/person days at risk). Information about explanatory factors was collected...

  20. 49 CFR 393.30 - Battery installation.

    Science.gov (United States)

    2010-10-01

    ... NECESSARY FOR SAFE OPERATION Lamps, Reflective Devices, and Electrical Wiring § 393.30 Battery installation... 49 Transportation 5 2010-10-01 2010-10-01 false Battery installation. 393.30 Section 393.30 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL MOTOR CARRIER SAFETY...

  1. Demographic characteristics of nuclear installations sites

    International Nuclear Information System (INIS)

    Doumenc, A.; Faure, J.

    1988-01-01

    The selection of a nuclear installations sites can not be conceived without a deep analysis of demographic context. This analysis permits to define the critical populations around the installation and is an essential element of emergency plans. 1 tab., 2 refs. (F.M.)

  2. The safety of nuclear installations

    International Nuclear Information System (INIS)

    1993-01-01

    This Safety Fundamental publication sets out basic objectives, concepts and principles for ensuring safety that can be used both by the IAEA in its international assistance operations and by Member States in their national nuclear programmes. These Safety Fundamentals apply primarily to those nuclear installations in which the stored energy developed in certain situations could potentially results in the release of radioactive material from its designated location with the consequent risk of radiation exposure of people. These principles are applicable to a broad range of nuclear installations, but their detailed application will depend on the particular technology and the risks posed by it. In addition to nuclear power plants, such installations may include: research reactors and facilities, fuel enrichment, manufacturing and reprocessing plants; and certain facilities for radioactive waste treatment and storage

  3. Survey of large-scale solar water heaters installed in Taiwan, China

    Energy Technology Data Exchange (ETDEWEB)

    Chang Keh-Chin; Lee Tsong-Sheng; Chung Kung-Ming [Cheng Kung Univ., Tainan (China); Lien Ya-Feng; Lee Chine-An [Cheng Kung Univ. Research and Development Foundation, Tainan (China)

    2008-07-01

    Almost all the solar collectors installed in Taiwan, China were used for production of hot water for homeowners (residential systems), in which the area of solar collectors is less than 10 square meters. From 2001 to 2006, there were only 39 large-scale systems (defined as the area of solar collectors being over 100 m{sup 2}) installed. Their utilization purposes are for rooming house (dormitory), swimming pool, restaurant, and manufacturing process. A comprehensive survey of those large-scale solar water heaters was conducted in 2006. The objectives of the survey were to asses the systems' performance and to have the feedback from the individual users. It is found that lack of experience in system design and maintenance are the key factors for reliable operation of a system. For further promotion of large-scale solar water heaters in Taiwan, a more compressive program on a system design for manufacturing process should be conducted. (orig.)

  4. 26 CFR 1.1275-6 - Integration of qualifying debt instruments.

    Science.gov (United States)

    2010-04-01

    ... § 1.483-4 or § 1.1275-4(c) (certain contingent payment debt instruments issued for nonpublicly traded... the qualifying debt instrument. A financial instrument that hedges currency risk is not a § 1.1275-6... denominated in pounds, the swap hedges only interest rate risk, not currency risk. Therefore, the transaction...

  5. Tracking the Sun 10: The Installed Price of Residential and Non-Residential Photovoltaic Systems in the United States

    Energy Technology Data Exchange (ETDEWEB)

    Barbose, Galen [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Darghouth, Naim R. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Millstein, Dev [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); LaCommare, Kristina [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); DiSanti, Nicholas [Exeter Associates, Columbia, MD (United States); Widiss, Rebecca [Exeter Associates, Columbia, MD (United States)

    2017-09-21

    Berkeley Lab’s Tracking the Sun report series is dedicated to summarizing trends in the installed price of grid-connected, residential and non-residential systems solar photovoltaic (PV) systems in the United States. The present report, the tenth edition in the series, focuses on systems installed through year-end 2016, with preliminary data for the first half of 2017. The report provides an overview of both long-term and more-recent trends, highlighting key drivers for installed price declines over different time horizons. The report also extensively characterizes the widespread variability in system pricing, comparing installed prices across states, market segments, installers, and various system and technology characteristics. The trends described in this report derive from project-level data collected by state agencies and utilities that administer PV incentive programs, solar renewable energy credit (SREC) registration systems, or interconnection processes. In total, data for this report were compiled and cleaned for more than 1.1 million individual PV systems, though the analysis in the report is based on a subset of that sample, consisting of roughly 630,000 systems with available installed price data. The full underlying dataset of project-level data (excluding any confidential information) is available in a public data file, for use by other researchers and analysts.

  6. A study for the installation of the TEXT heavy-ion beam probe on DIII-D

    Science.gov (United States)

    Edmonds, P. H.; Solano, E. R.; Bravenec, R. V.; Wootton, A. J.; Schoch, P. M.; Crowley, T. P.; Hickok, R. L.; West, W. P.; Leuer, J.; Anderson, P.

    1997-01-01

    An assessment of the feasibility of installing the TEXT 2 MeV heavy-ion beam probe on the DIII-D tokamak has been completed. Detailed drawings of the machine cross section were imported into the CAD application AutoCAD. A set of programs written in AutoLisp were used to generate trajectories. Displays of the accessible cross section of the plasma, scan lines for the entire range of primary beam energy and injection angle ranges, and sample-volume dimensions can be rapidly generated. Because of the large deflection between the primary input beam and the emergent secondary beam, either the analyzer needs to be tracked over a ±20° angle or secondary poloidal deflector plates need to be installed at the exit port. Toroidal deflector plates will be installed at both the injection and exit ports to compensate for toroidal displacements and deflections. The sample volumes generated by this procedure are within a few centimeters of the locations derived from a full three-dimensional calculation.

  7. 75 FR 3168 - Vocational Rehabilitation and Employment Program-Self-Employment

    Science.gov (United States)

    2010-01-20

    ... Employment Program--Self-Employment AGENCY: Department of Veterans Affairs. ACTION: Final rule. SUMMARY: This document amends the vocational rehabilitation and employment regulations of the Department of Veterans Affairs (VA) concerning self-employment for individuals with qualifying disabilities. We are making...

  8. Fast polarizers installation for ECRH and ECE in TCV

    Energy Technology Data Exchange (ETDEWEB)

    Silva, Miguel, E-mail: miguel.silva@epfl.ch [Ecole Polytechnique Federale de Lausanne (EPFL), Centre de Recherches en Physique des Plasmas (CRPP), Association EURATOM-Confederation Suisse, CH-1015 Lausanne (Switzerland); Goodman, Timothy; Felici, Federico; Porte, Laurie [Ecole Polytechnique Federale de Lausanne (EPFL), Centre de Recherches en Physique des Plasmas (CRPP), Association EURATOM-Confederation Suisse, CH-1015 Lausanne (Switzerland)

    2011-10-15

    We report on the installation of fast polarizers for ECRH injection and ECE diagnostics, in the TCV tokamak. The main goal is to change the polarization during a plasma shot and react to changing conditions such as: plasma current and position, ECRH injection angles as well as ECE oblique observation angle and correlation ECE frequency. This will allow tracking of plasma variations, find optimum parameters to maximize ECRH absorption and improve the quality and consistency of ECE measurements. The polarization is varied using two fast polarizers, from General Atomics, positioned either in the evacuated transmission line for ECRH, or in a similar non-evacuated line near a real-time moveable directional antenna for ECE. A programmable driver is used to control a servo-motor and allows three operation modes during a plasma shot: fixed angle position, pre-programmed reference waveform and following of a real-time reference waveform. Preliminary tests of the motor controller achieved an 8 Hz bandwidth for a {+-}4{sup o} amplitude motion and a 2.2 Hz bandwidth for a {+-}4{sup o} amplitude motion. The fast polarizers are presently in the ECE system and the control hardware is being installed.

  9. Individual Learning Route as a Way of Highly Qualified Specialists Training for Extraction of Solid Commercial Minerals Enterprises

    Science.gov (United States)

    Oschepkova, Elena; Vasinskaya, Irina; Sockoluck, Irina

    2017-11-01

    In view of changing educational paradigm (adopting of two-tier system of higher education concept - undergraduate and graduate programs) a need of using of modern learning and information and communications technologies arises putting into practice learner-centered approaches in training of highly qualified specialists for extraction and processing of solid commercial minerals enterprises. In the unstable market demand situation and changeable institutional environment, from one side, and necessity of work balancing, supplying conditions and product quality when mining-and-geological parameters change, from the other side, mining enterprises have to introduce and develop the integrated management process of product and informative and logistic flows under united management system. One of the main limitations, which keeps down the developing process on Russian mining enterprises, is staff incompetence at all levels of logistic management. Under present-day conditions extraction and processing of solid commercial minerals enterprises need highly qualified specialists who can do self-directed researches, develop new and improve present arranging, planning and managing technologies of technical operation and commercial exploitation of transport and transportation and processing facilities based on logistics. Learner-centered approach and individualization of the learning process necessitate the designing of individual learning route (ILR), which can help the students to realize their professional facilities according to requirements for specialists for extraction and processing of solid commercial minerals enterprises.

  10. Logistics of LEP installation

    International Nuclear Information System (INIS)

    Genier, C.; Capper, S.

    1988-01-01

    The size of the LEP project, coupled with the tight construction schedules, calls for organized planning, logistics, monitoring and control. This is being carried out at present using tools such as ORACLE the Relational Database Management System, running on a VAX cluster for data storage and transfer, micro-computers for on-site follow-up, and PC's running Professional ORACLE, DOS and XENIX linked to a communications network to receive data feedback concerning transport and handling means. Following over 2 years of installations, this paper presents the methods used for the logistics of installation and their results

  11. Nuclear installations and their environment

    International Nuclear Information System (INIS)

    Rieu, Ch.; Berge-Thierry, C.; Duval, C.; Bonnet, Ch.; Gaubert, B.; Riffard, Th.; Greffier, G.; Cervantes, J.C.; Le Breton, F.; Clement, C.; Charbonnier, R.; Andreani, A.M.; Maubert, H.; Maisonneuve, A.

    2002-01-01

    This dossier deals with protection of nuclear installations against external risks. The articles come from the presentations of the Conference on 'Nuclear installations and their environment', held by the 'Safety and Environment Protection' Section of the French Nuclear Energy Society on October 15, 2002. Floods, earthquakes, winter cold, snow-falls, wind, fires are the main natural risks taken into account. Risks from industrial environment and communication lines are also considered. (authors)

  12. Assessment of Knowledge and Attitudes of Newly-Qualified Doctors Towards AIDS Infection

    Directory of Open Access Journals (Sweden)

    Thomais Kalogirou

    2010-01-01

    Full Text Available Background: Health-care professionals are at a high risk of AIDS infection, among hospitalized HIV infectedpatients. Proper training and knowledge accompanied by necessary preventive measures are by all means, the mostsignificant factors which ensure low accident rates and furthermore lower contamination rates of the health-carepersonnel.Objective: Screening and assessment of knowledge and attitudes of newly-qualified doctors towards AIDSinfection.Methodology: We conducted a cohort study with a screening questionnaire, which included demographic data and16 questions associated with AIDS infection. 51 forms were filled in by specializing and rural doctors. Thestatistical analysis was conducted using the statistical program SPSS 13.Results: 25,5% (n=13 of the participants in this reserch have treated at least one patient for HIV infection, 19%(n=10, of them would willingly specialize in intense care of HIV patients and lastly 90.2%(n=46 believe that weshould preserve the medical confidential for HIV patients. 96.1% (n=49 of the participants doctors knew thatAIDS disease is caused by Human Immunodeficiency Virus (HIV, 88.2%(n=45 is aware that HIV virus damagesthe immune system and finally 92% (n=47 recognize HIV symptomatology.The vast majority of the doctors(98%,n=50 is aware that HIV infection is spread through sexual intercourse, blood contact and by sharing needlesor syringes. Nevertheless, a percentage of 13.7% (n=7 believe that HIV transmission is feasible through kissingand 7.8% (n=15 through insects’ bites. At last 85-98% of the personnel refer that it’s familiar with the generalpreventive measures, which are usually applied to all HIV positive inpatients.Conclusions: Knowledge and attitude of new doctors towards AIDS infection is, in general terms satisfactory.Nevertheless, it’s imperative that we constantly inform and update newly-qualified doctors about AIDS infection,in order to minimize their inhibitions and compensate for the

  13. Military Transition Assistance Program (TAP): An Overview

    Science.gov (United States)

    2017-03-15

    in the development, management oversight, and strategic planning of TAP. TAP Counseling Requirements Over time, Congress has increased the...training, and placement services provided under qualified job training programs of the DOL* Veterans small business ownership and entrepreneurship ...Accessing Higher Education (DOD) Career Technical Training (VA) Entrepreneurship (SBA) Capstone Verifies that servicemembers have met Career

  14. The-GEOSCOPE Program

    Directory of Open Access Journals (Sweden)

    J. P. Montagner

    1994-06-01

    Full Text Available he purpose of the GEOSCOPE Program was the installation of 25 stations in the standard configuration defined by the FDSN (VBB 24 bit, continuous recording at 20 samples/s. The installation is almost complete. The effort this year focussed on the accessibility of data, either through the IRIS/GOPHER system for large earthquakes, through CD-ROM production, and on line using the Juke-box JUMBO in the GEOSCOPE Data Center (Paris. This aspect will be stressed as the cooperation between IRIS and GEOSCOPE intensifies.

  15. Impact of the hydropower installations on the environment as revealed in the environmental impact studies of the Institute of Hydroelectric Studies and Design

    International Nuclear Information System (INIS)

    Teodorescu, Dan

    1996-01-01

    The results of the studies of hydropower installation impact on the environment carried out by ISPH are presented. These studies are based on the recommendations of the UN Program for the Environment, as well as those of the European Community. In the period 1993-1995 more than 15 impact studies have been carried out taking into account aspects related to geology, geomorphology, seismology, hydrology, cultural-historical patrimony archaeology, tourism and aesthetics. Both high water fall and low water fall installations located at different altitudes have been analysed. Consequently, the construction of the dams were different. From the studies, three categories of problems can be reported: 1. specific problems of a certain hydropower installation; 2. specific problems of a certain type of hydropower installation; 3. general problems regardless of the power installation type. (author)

  16. 78 FR 77366 - Federal Employee Dental and Vision Insurance Program; Qualifying Life Event Amendments

    Science.gov (United States)

    2013-12-23

    ... the Federal Employees Health Benefits (FEHB) Program. DATES: Comment date: Comments are due on or... enrollment status under the Federal Employee Dental and Vision Insurance Program. OPM is proposing these... for FEDVIP enrollment changes and therefore better align FEDVIP with the Federal Employees Health...

  17. Magnetic Fusion Science Fellowship program: Summary of program activities for calendar year 1986

    International Nuclear Information System (INIS)

    1986-01-01

    This report describes the 1985-1986 progress of the Magnetic Fusion Science Fellowship program (MFSF). The program was established in January of 1985 by the Office of Fusion Energy (OFE) of the US Department of Energy (DOE) to encourage talented undergraduate and first-year graduate students to enter qualified graduate programs in the sciences related to fusion energy development. The program currently has twelve fellows in participating programs. Six new fellows are being appointed during each of the program's next two award cycles. Appointments are for one year and are renewable for two additional years with a three year maximum. The stipend level also continues at a $1000 a month or $12,000 a year. The program pays all tuition and fee expenses for the fellows. Another important aspect of the fellowship program is the practicum. During the practicum fellows receive three month appointments to work at DOE designated fusion science research and development centers. The practicum allows the MFSF fellows to directly participate in on-going DOE research and development programs

  18. Improving Energy Security for Air Force Installations

    Science.gov (United States)

    Schill, David

    Like civilian infrastructure, Air Force installations are dependent on electrical energy for daily operations. Energy shortages translate to decreased productivity, higher costs, and increased health risks. But for the United States military, energy shortages have the potential to become national security risks. Over ninety-five percent of the electrical energy used by the Air Force is supplied by the domestic grid, which is susceptible to shortages and disruptions. Many Air Force operations require a continuous source of energy, and while the Air Force has historically established redundant supplies of electrical energy, these back-ups are designed for short-term outages and may not provide sufficient supply for a longer, sustained power outage. Furthermore, it is the goal of the Department of Defense to produce or procure 25 percent of its facility energy from renewable sources by fiscal year 2025. In a government budget environment where decision makers are required to provide more capability with less money, it is becoming increasingly important for informed decisions regarding which energy supply options bear the most benefit for an installation. The analysis begins by exploring the field of energy supply options available to an Air Force installation. The supply options are assessed according to their ability to provide continuous and reliable energy, their applicability to unique requirements of Air Force installations, and their costs. Various methods of calculating energy usage by an installation are also addressed. The next step of this research develops a methodology and tool which assesses how an installation responds to various power outage scenarios. Lastly, various energy supply options are applied to the tool, and the results are reported in terms of cost and loss of installation capability. This approach will allow installation commanders and energy managers the ability to evaluate the cost and effectiveness of various energy investment options.

  19. Development regulation regarding with licensing of nuclear installation

    International Nuclear Information System (INIS)

    Bambang Riyono; Yudi Pramono; Dahlia Cakrawati Sinaga

    2011-01-01

    Provisions of Article 17 paragraph (3) of Law Number 10 Year 1997 on Nuclear cleary mandates for the establishment of government regulations (GR) on Nuclear licensing containing the requirements and procedure, both from the standpoint of their utilization and installation. To use has been rising GR No.29 Year 2008 on the Use of Ionizing Radiation Sources and Nuclear Materials, while for the installation has been published PP No.43 Year 2006 on Nuclear Reactor Licensing, and BAPETEN Chairman Decree No.3 Year 2006 on Non-reactor Nuclear Installation Licensing. Based on the background of the preparation of both the aforementioned are just regulate the reactor and utilization, not yet fully meet the mandate of Article 17 paragraph (3) of Law No.10 of 1997 on Nuclear, including other nuclear installations. For these reasons, it initiated the need for a separate regulation containing provisions concerning licensing of non-reactor nuclear installations. On the other side from the understanding the legal aspects and interpretations of the Law No.10 of 2004 on the Establishment Regulation Legislation, should be in single mandate of Article 17 paragraph (3) of Law No.10 of 1997 on Nuclear would only produce one of the requirements and procedure for the use or installation, or a maximum of two (2) GR related licensing the use and installation. This is encourages conducted the assessing or studies related to how possible it is according to the legal aspect is justified to combine in one Nuclear licensing regulations regarding both the use and installation, by looking at the complexity of installation and wide scope of utilization of nuclear energy in Indonesia. The results of this paper is expected to provide input in the preparation of GR on licensing of nuclear installations. (author)

  20. The Medicaid personal care services program: implications for social work practice.

    Science.gov (United States)

    Oktay, J S; Palley, H A

    1991-05-01

    Results of a survey of Medicaid personal care programs in 15 states and the District of Columbia in 1987 show that these programs suffer from many problems. Low wages and slow payment make recruitment and retention of qualified workers difficult. Other problems include lack of coordination among agencies, lack of adequate standards for training or supervision of workers, unequal access to programs, and inequities among states. Implications for social workers are discussed.

  1. HIGHLY QUALIFIED WORKING FORCE – KEY ELEMENT OF INNOVATIVE DEVELOPMENT MODEL

    Directory of Open Access Journals (Sweden)

    M. Avksientiev

    2014-12-01

    Full Text Available Highly qualified working force is a central element of intensive development model in modern society. The article surveys the experience of countries that managed to transform their economy to the innovative one. Ukrainian economy cannot stand aside processes that dominate the world economy trends, thus we are to use this experience to succeed in future. Today any government of the world is facing challenges that occur due to transformation of the economy into informational one. This type of economy causes its transformation form extensive to intensive one. The main reasons under that is limitation of nature resources, material factors of production. Thus this approach depends much on the quality of working force. Unfortunately in Ukraine there is a misbalance in specialist preparation. This puts additional pressure on the educational sphere also. In order to avoid this pressure we are to conduct reforms in education sphere. Nowadays, in the world views and concepts of governmental role in the social development are changing. This why, even at times of economic recession educational costs are not reduced under the new economical doctrine in the EU. Highly qualified specialists, while creating new products and services play role of engineers in XXI century. They are to lead their industries to world leading positions. From economic point of view, highly qualified specialists benefit society with higher income rates, taxation and thus, increasing the living standards in society. Thus, the majority if modern scientists prove the importance of highly trained working force for more effective economic development.

  2. Decommissioning and dismantling of nuclear installations

    International Nuclear Information System (INIS)

    Pelzer, N.

    1993-01-01

    The German law governing decommissioning and dismantling of nuclear installations can be called to be embryonic as compared to other areas of the nuclear regulatory system, and this is why the AIDN/INLA regional meeting organised by the German national committee in July 1992 in Schwerin has been intended to elaborate an assessment of the current legal situation and on this basis establish proposals for enhancement and development, taking into account the experience reported by experts from abroad. The proceedings comprise the paper of the opening session, 'Engineering and safety aspects of the decommissioning of nuclear installations', and the papers and discussions of the technical sessions entitled: - Comparative assessment of the regulatory regimes. - Legislation governing the decommissioning of nuclear installations in Germany. - Analysis of the purpose and law making substance of existing regulatory provisions for the decommissioning of nuclear installations. All seventeen papers of the meeting have been prepared for separate retrieval from the database. (orig./HSCH) [de

  3. Culture safety in the nuclear installation

    International Nuclear Information System (INIS)

    Benar Bukit

    2008-01-01

    Culture safety is aimed to empower all the personnel to contribute and responsible to the installation safety where they work in. Culture safety is important as there were so many accidents happened due to the little attention given to the safety, take as examples of what happened in Three Mille Island installation (1979) and Chernobyl (1986). These remind us that human factor gives a significant contribution to the failure of operational system which influences the safety. Therefore, as one of institutions which has nuclear installation. National Nuclear Energy Agency must apply the culture safety to guarantee the safety operation of nuclear installation to protect the personnel, community and environment from the hazard of radioactive radiation. Culture safety has two main components. The first component under the management responsibility is a framework needed in an organisation. The second component is the personnel attitude in al/ levels to respond and optimize those framework. (author)

  4. 29 CFR 2520.104-46 - Waiver of examination and report of an independent qualified public accountant for employee...

    Science.gov (United States)

    2010-07-01

    ... qualified public accountant for employee benefit plans with fewer than 100 participants. 2520.104-46 Section... Requirements § 2520.104-46 Waiver of examination and report of an independent qualified public accountant for... public accountant to conduct an examination of the financial statements of the plan; (2) Include within...

  5. Notes on LED Installations in Street Illumination

    Directory of Open Access Journals (Sweden)

    Elisabeta Spunei

    2014-09-01

    Full Text Available The paper presents a study made on choosing LED street lighting installations, such that the quality requirements for exterior artificial lighting are fulfilled. We analyze two types of LED street lighting installations from a technical point of view, together with lighting level and brightness values obtained during the measurements. Following on the field measurements, the lighting quality parameters are calculated, and, for the lighting installation with the best performance, optimal mounting suggestions are made. The optimal quality parameters are calculated by simulations using the Dialux software. The same software and the same light sources we also compute an optimal street lighting by determining the size of the installation that provides the best lighting parameter values.

  6. M2 qualify laser beam propagation

    International Nuclear Information System (INIS)

    Abdelhalim, Bencheikh; Mohamed, Bouafia

    2010-01-01

    One of the most important properties of a laser resonator is the highly collimated or spatially coherent nature of the laser output beam. Laser beam diameter and quality factor M 2 are significant parameters in a wide range of laser applications. This is because the spatial beam quality determines how closely the beam can be focused or how well the beam propagates over long distances without significant dispersion. In the present paper we have used three different methods to qualify the spatial structure of a laser beam propagating in free space, the results are obtained and discussed, and we have found that the Wigner distribution function is a powerful tool which allows a global characterization of any kind of beam

  7. Tracking the Sun II: The Installed Cost of Photovoltaics in the U.S. from 1998-2008

    Energy Technology Data Exchange (ETDEWEB)

    Barbose, Galen L; Wiser, Ryan; Peterman, Carla; Darghouth, Naim

    2009-10-05

    Installations of solar photovoltaic (PV) systems have been growing at a rapid pace in recent years. In 2008, 5,948 MW of PV was installed globally, up from 2,826 MW in 2007, and was dominated by grid-connected applications. The United States was the world's third largest PV market in terms of annual capacity additions in 2008, behind Spain and Germany; 335 MW of PV was added in the U.S. in 2008, 293 MW of which came in the form of grid-connected installations. Despite the significant year-on-year growth, however, the share of global and U.S. electricity supply met with PV remains small, and annual PV additions are currently modest in the context of the overall electric system. The market for PV in the U.S. is driven by national, state, and local government incentives, including up-front cash rebates, production-based incentives, requirements that electricity suppliers purchase a certain amount of solar energy, and Federal and state tax benefits. These programs are, in part, motivated by the popular appeal of solar energy, and by the positive attributes of PV - modest environmental impacts, avoidance of fuel price risks, coincidence with peak electrical demand, and the location of PV at the point of use. Given the relatively high cost of PV, however, a key goal of these policies is to encourage cost reductions over time. Therefore, as policy incentives have become more significant and as PV deployment has accelerated, so too has the desire to track the installed cost of PV systems over time, by system characteristics, by system location, and by component. To address this need, Lawrence Berkeley National Laboratory initiated a report series focused on describing trends in the installed cost of grid-connected PV systems in the U.S. The present report, the second in the series, describes installed cost trends from 1998 through 2008. The analysis is based on project-level cost data from more than 52,000 residential and non-residential PV systems in the U.S., all of

  8. 34 CFR 674.58 - Cancellation for service in an early childhood education program.

    Science.gov (United States)

    2010-07-01

    ... complete academic year, or its equivalent. (5) In order to qualify for cancellation, the borrower's salary may not exceed the salary of a comparable employee working in the local educational agency of the area..., emotional, and physical development. (3) A child care program is a program that is licensed or regulated by...

  9. Yuma Border Patrol Lighting Retrofit: Final LED System Performance Assessment of Trial and Full Installation

    Energy Technology Data Exchange (ETDEWEB)

    Andrea Wilkerson, Gregory P Sullivan, Robert G Davis, Sarah Safranek

    2018-04-30

    Along the Yuma Sector Border Patrol Area in Yuma, Arizona, the GATEWAY program conducted a trial evaluation in which the incumbent quartz metal halide area lighting was replaced with LED at three pole locations, and illuminance measurements were recorded initially and at 2500 hours, 5000 hours, 7000, and 11,000 hours of operation. Additionally, four second-generation LED luminaires installed as part of the full installation were evaluated initially and again after 4,000 hours of operation. While the initial energy, lighting quality, and maintenance benefits relative to the incumbent high-pressure sodium system were very satisfactory, the study raises important questions regarding the long-term performance of LED lighting systems in high-temperature environments.

  10. 13 CFR 120.700 - What is the Microloan Program?

    Science.gov (United States)

    2010-01-01

    ... to Intermediaries and other qualified nonprofit entities to be used for marketing, management, and... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false What is the Microloan Program? 120.700 Section 120.700 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION BUSINESS LOANS...

  11. Tracking the Sun VIII. The Installed Price of Residential and Non-Residential Photovoltaic Systems in the United States

    Energy Technology Data Exchange (ETDEWEB)

    Barbose, Galen L. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Darghouth, Naïm R. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Millstein, Dev [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Spears, Mike [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Wiser, Ryan H. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Buckley, Michael [Exeter Associates, Columbia, MD (United States); Widiss, Rebecca [Exeter Associates, Columbia, MD (United States); Grue, Nick [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2015-08-01

    Now in its eighth edition, Lawrence Berkeley National Laboratory (LBNL)’s Tracking the Sun report series is dedicated to summarizing trends in the installed price of grid-connected solar photovoltaic (PV) systems in the United States. The present report focuses on residential and nonresidential systems installed through year-end 2014, with preliminary trends for the first half of 2015. As noted in the text box below, this year’s report incorporates a number of important changes and enhancements. Among those changes, this year's report focuses solely on residential and nonresidential PV systems; data on utility-scale PV are reported in LBNL’s companion Utility-Scale Solar report series. Installed pricing trends presented within this report derive primarily from project-level data reported to state agencies and utilities that administer PV incentive programs, solar renewable energy credit (SREC) registration systems, or interconnection processes. In total, data were collected for roughly 400,000 individual PV systems, representing 81% of all U.S. residential and non-residential PV capacity installed through 2014 and 62% of capacity installed in 2014, though a smaller subset of this data were used in analysis.

  12. Civilian protection and Britain's commercial nuclear installations

    International Nuclear Information System (INIS)

    1981-01-01

    The subject is treated as follows: initial conclusions (major nuclear attack on military installations; nuclear attack including civil nuclear targets; conventional attack on civil nuclear installations); nature of nuclear weapons explosions and power reactor releases (general; dose effects and biologically significant isotopes; nuclear weapon effects; effect of reactors and other fuel-cycle installations in a thermonuclear area; implications of reactor releases due to conventional attack, sabotage, civil disorder or major accident). (U.K.)

  13. 14 CFR 25.1703 - Function and installation: EWIS.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Function and installation: EWIS. 25.1703... AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Electrical Wiring Interconnection Systems (EWIS) § 25.1703 Function and installation: EWIS. (a) Each EWIS component installed in any area of the...

  14. Offshore Cable Installation - Lillgrund. Lillgrund Pilot Project

    Energy Technology Data Exchange (ETDEWEB)

    Unosson, Oscar [Vattenfall Vindkraft AB, Stockholm (Sweden)

    2009-01-15

    This report describes the installation method and the experiences gained during the installation of the submarine cables for the offshore wind farm at Lillgrund. The wind farm consists of 48 wind turbines and is expected to produce 0.33 TWh annually. Different aspects of the installation, such as techniques, co-operation between the installation teams, weather conditions and regulatory and environmental issues are described in this report. In addition, recommendations and guidelines are provided, which hopefully can be utilised in future offshore wind projects. The trenches, in which the submarine cables were laid, were excavated weeks before the cable laying. This installation technique proved to be successful for the laying of the inter array cables. The export cable, however, was laid into position with difficulty. The main reason why the laying of the export cable proved more challenging was due to practical difficulties connected with the barge entrusted with the cable laying, Nautilus Maxi. The barge ran aground a number of times and it had difficulties with the thrusters, which made it impossible to manoeuvre. When laying the inter array cables, the method specification was closely followed, and the laying of the cables was executed successfully. The knowledge and experience gained from the offshore cable installation in Lillgrund is essential when writing technical specifications for new wind plant projects. It is recommended to avoid offshore cable installation work in winter seasons. That will lower the chances of dealing with bad weather and, in turn, will reduce the risks

  15. 20 CFR 1010.210 - In which Department job training programs do covered persons receive priority of service?

    Science.gov (United States)

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false In which Department job training programs do... job training programs do covered persons receive priority of service? (a) Priority of service applies to every qualified job training program funded, in whole or in part, by the Department, including: (1...

  16. Risk assessment techniques for industrial installations

    International Nuclear Information System (INIS)

    Croitoru, C.; Dumitrescu, M.; Preda, I.; Stefanescu, I.; Titescu, G.

    1995-01-01

    This paper presents a risk analysis which concerns the following stages: identification of the initiation events, evaluation of the occurrence frequency of different accident sequences, assessment of human, economical, and environmental consequences, risk assessment and management. The study of the accident sequences subsequent to an initiation event was achieved by the event tree method. Also, there were developed methods based on mathematical models of installations which take into account reliability data, data concerning the exploitation history, and data referring to the human factor effects in the installation operation. These methods were used for the determination of occurrence frequencies of hydrogen sulfide emission accidents in the heavy water production installations

  17. Safety report concerning the reactor Pegase - volume 1 - Description of the installation - volume 2 - Safety of the installations; Rapport de surete du reacteur pegase - tome 1 - Description des installations - tome 2 - Surete des installations

    Energy Technology Data Exchange (ETDEWEB)

    Lacour, J. [Commissariat a l' Energie Atomique, Saclay (France). Centre d' Etudes Nucleaires; Legoin, P. [S.E.M. Hispano-Suiza, 92 - Colombes (France)

    1964-07-01

    In the first volume: This report is a description of the reactor Pegase, given with a view to examine the safety of the installations. The Cadarache site at which they are situated is briefly described, in particular because of the consequences on the techniques employed for building Pegase. A description is also given of the original aspects of the reactor. The independent loops which are designed for full-scale testing of fuel elements used in natural uranium-gas-graphite reactor systems are described in this report, together with their operational and control equipment. In the second volume: In the present report are examined the accidents which could cause damage to the Pegase reactor installation. Among possible causes of accidents considered are the seismicity of the region, an excessive power excursion of the reactor and a fracture in the sealing of an independent loop. Although all possible precautions have been taken to offset the effects of such accidents, their ultimate consequences are considered here. The importance is stressed of the security action and regulations which, added to the precautions taken for the construction, ensure the safety of the installations. (authors) [French] Dans le volume 1: Ce rapport est une description du reacteur Pegase, afin d'examiner la surete des installations. Le site de CADARACHE ou elles sont situees, a ete sommairement decrit, en particulier, a cause des consequences sur les techniques mises en oeuvre pour la realisation de Pegase. Nous nous sommes egalement attache a decrire les aspects originaux du reacteur. Les boucles autonomes destinees a tester en vraie grandeur des elements combustibles de la filiere uranium naturel graphite-gaz, ainsi que leurs dispositifs de controle et d'exploitation, figurent egalement dans ce rapport. Dans le volume 2: Dans le present rapport, nous examinons des accidents pouvant endommager des installations du reacteur Pegase. Les origines d'accidents examines

  18. Safety report concerning the reactor Pegase - volume 1 - Description of the installation - volume 2 - Safety of the installations; Rapport de surete du reacteur pegase - tome 1 - Description des installations - tome 2 - Surete des installations

    Energy Technology Data Exchange (ETDEWEB)

    Lacour, J [Commissariat a l' Energie Atomique, Saclay (France). Centre d' Etudes Nucleaires; Legoin, P [S.E.M. Hispano-Suiza, 92 - Colombes (France)

    1964-07-01

    In the first volume: This report is a description of the reactor Pegase, given with a view to examine the safety of the installations. The Cadarache site at which they are situated is briefly described, in particular because of the consequences on the techniques employed for building Pegase. A description is also given of the original aspects of the reactor. The independent loops which are designed for full-scale testing of fuel elements used in natural uranium-gas-graphite reactor systems are described in this report, together with their operational and control equipment. In the second volume: In the present report are examined the accidents which could cause damage to the Pegase reactor installation. Among possible causes of accidents considered are the seismicity of the region, an excessive power excursion of the reactor and a fracture in the sealing of an independent loop. Although all possible precautions have been taken to offset the effects of such accidents, their ultimate consequences are considered here. The importance is stressed of the security action and regulations which, added to the precautions taken for the construction, ensure the safety of the installations. (authors) [French] Dans le volume 1: Ce rapport est une description du reacteur Pegase, afin d'examiner la surete des installations. Le site de CADARACHE ou elles sont situees, a ete sommairement decrit, en particulier, a cause des consequences sur les techniques mises en oeuvre pour la realisation de Pegase. Nous nous sommes egalement attache a decrire les aspects originaux du reacteur. Les boucles autonomes destinees a tester en vraie grandeur des elements combustibles de la filiere uranium naturel graphite-gaz, ainsi que leurs dispositifs de controle et d'exploitation, figurent egalement dans ce rapport. Dans le volume 2: Dans le present rapport, nous examinons des accidents pouvant endommager des installations du reacteur Pegase. Les origines d'accidents examines comprennent la seismicite

  19. Installation of beam screens in LHC arc cryomagnets

    CERN Document Server

    Cruikshank, P; Schneider, G; Veness, R J M

    1999-01-01

    Beam screens will be installed in the cold bores of the LHC arc cryodipoles and Short Straight Sections (SSS). This note describes the constraints on the beam screen installation imposed by the beam vacuum interconnects and Beam Position Monitors (BPM), and explains the installation scenario which has been adopted.

  20. Site evaluation for nuclear installations. Safety requirements

    International Nuclear Information System (INIS)

    2003-01-01

    This Safety Requirements publication supersedes the Code on the Safety of Nuclear Power Plants: Siting, which was issued in 1988 as Safety Series No. 50-C-S (Rev. 1). It takes account of developments relating to site evaluations for nuclear installations since the Code on Siting was last revised. These developments include the issuing of the Safety Fundamentals publication on The Safety of Nuclear Installations, and the revision of various safety standards and other publications relating to safety. Requirements for site evaluation are intended to ensure adequate protection of site personnel, the public and the environment from the effects of ionizing radiation arising from nuclear installations. It is recognized that there are steady advances in technology and scientific knowledge, in nuclear safety and in what is considered adequate protection. Safety requirements change with these advances and this publication reflects the present consensus among States. This Safety Requirements publication was prepared under the IAEA programme on safety standards for nuclear installations. It establishes requirements and provides criteria for ensuring safety in site evaluation for nuclear installations. The Safety Guides on site evaluation listed in the references provide recommendations on how to meet the requirements established in this Safety Requirements publication. The objective of this publication is to establish the requirements for the elements of a site evaluation for a nuclear installation so as to characterize fully the site specific conditions pertinent to the safety of a nuclear installation. The purpose is to establish requirements for criteria, to be applied as appropriate to site and site-installation interaction in operational states and accident conditions, including those that could lead to emergency measures for: (a) Defining the extent of information on a proposed site to be presented by the applicant; (b) Evaluating a proposed site to ensure that the site