WorldWideScience

Sample records for prosthodontic maintenance efforts

  1. Mandibular overdentures: a review of treatment philosophy and prosthodontic maintenance.

    Science.gov (United States)

    Al-Zubeidi, Mohammed I; Payne, Alan G T

    2007-12-01

    Root overdentures and implant overdentures are two similar treatment options for the nearly-edentulous or edentulous mandible. The purpose of this literature review was to specifically compare their prosthodontic treatment philosophies and follow-up maintenance requirements. Critical comparison of these two prosthodontic treatment philosophies revealed that the foundation for overdentures which is provided by oral implants is more predictable than that provided by the roots of natural teeth. The two treatment modalities have both similarities and differences in their associated prosthodontic maintenance. The findings of this literature review suggest the future possibility that mandibular root overdentures may become obsolete as a treatment approach.

  2. Prosthodontic maintenance of overdentures on zirconia implants: 1-year results of a randomized controlled trial.

    Science.gov (United States)

    Osman, Reham B; Ma, Sunyoung

    2014-01-01

    The purpose of this study was to determine the prosthodontic outcomes of one-piece zirconia implants and their attachment systems in edentulous participants with maxillary and mandibular overdentures after 1 year of a randomized controlled trial. Random allocation of 24 edentulous participants (age range: 45 to 86 years) into titanium (control) or zirconia (test) groups using onepiece implants and a planned unsplinted prosthodontic design was performed. Four maxillary implants (one midpalatal; three anterior crestal) and three mandibular implants (one midsymphyseal; two bilateral distal) were conventionally loaded with the overdentures. Similar attachment systems were used throughout: ball abutment-type patrices (diameter: 2.25 to 3.1 mm as part of the one-piece implants) and custommade plastic matrices (with or without metal housings depending on the patrix size). Prosthodontic outcomes were documented during the first year of the clinical trial. Following three deaths and two dropouts, there were 19 participants who were available at the 1-year recall. Of these participants, 3 had early maxillary implant failure and had to be converted to conventional maxillary complete dentures opposing mandibular implant overdentures. There were 79 maintenance events, 34 in the titanium (control) group and 45 in the zirconia (test) group. Patrix loss occurred as a result of three zirconia implant fractures (one mandibular and two crestal maxillary implants). Maintenance events were principally the replacement of matrices and overdenture fracture. Although relines and replacement overdentures also occurred, overall there were no significant differences in prosthodontic maintenance between the control and test groups. A six-field prosthodontic-success analysis table showed no statistically significant difference between the two groups; however, 50% of participants in each group were allocated to the retreatment (repair) field, which produced a low prosthodontic success rate

  3. Clinical Teaching of Prosthodontics in Undergraduate Courses in a German Dental School: Patients, Visits, Efforts, and Incentives.

    Science.gov (United States)

    Huettig, Fabian; Behrend, Florian

    2016-01-01

    It is unknown what disadvantages are faced by patients deciding for a prosthodontic treatment by inexperienced students. Commonly, the related extra effort and time are compensated by cost reduction of treatment fees. Thereby, the dental schools subsidize treatments to teach clinical prosthodontics. The aim of this study was to clarify the benefits to patients as well as the efforts of the dental school. Data collected from three courses in a dental school in Germany were patient gender, age, occupation, zip code, number of visits, scope of treatment including costs, financial discount, and remaining copayment. Travel costs were calculated based on zip code. Balance of travel costs and treatment discount was defined as financial benefit. The results showed that 185 patients (95 male) aged 32 to 82 years (median=58) were treated with fixed restorations (FR, n=110), telescopic dentures (TD, n=87), complete dentures (CD, n=17), or other (RD, n=3). The mean number of visits was 11 for FR, 12 for TD, and 9 for CD. Single distance to the clinic ranged from 0.6 to 65 miles (median=12). Total costs of prosthodontics were reduced by 19% on average. The mean financial benefit was 429 USD (median=298, min=-482, max=4025). The financial benefits were found to differ widely, including additional expenditures of patients. Participation, travel burden, and copayment did not depend on age, gender, or occupation. The financial benefit was relativized because students needed at least twice the sessions of a dentist. As a result, the financial efforts of dental schools are significant and compromise a cost-covering education.

  4. Structural factors affecting prosthodontic decision making in Japan

    Directory of Open Access Journals (Sweden)

    Noriyuki Wakabayashi

    2015-11-01

    Full Text Available Prosthodontic treatment strategies, prosthetic designs and materials, and treatment procedures are not determined solely by the diagnosis. We discuss the major effect of structural factors surrounding prosthodontic care on treatment decisions in Japan. These structural factors are related to the dentist, such as the dentist's education, postgraduate courses, and access to the latest research, and to the health care support system, including the social insurance system. Education content from schools of dentistry has clear effects on dentists’ treatment decisions, and the specific modalities taught depend highly on the school faculty. The use of research, especially clinical studies, in treatment decisions is currently limited. Regarding the health care support system factors, the public health insurance system has a strong effect on the actual prosthodontic treatments performed in Japan. To maintain the current piecework payment system, efforts should be encouraged to preclude both overtreatment and undertreatment. New perspectives on treatment decisions associated with technological advancement and changes in health care needs should be established to ensure that the Japanese population can enjoy high-quality prosthodontic treatment that meets international standards. The development of a clinical pathway and decision-making model that adheres to academic-based clinical guidelines and the insurance system will be necessary.

  5. Predoctoral dental students' perceptions and experiences with prosthodontics.

    Science.gov (United States)

    Dhima, Matilda; Petropoulos, Vicki C; Salinas, Thomas J; Wright, Robert F

    2013-02-01

    The aims of this study were to: (1) investigate the perceptions and experiences of predoctoral dental students and advanced standing students on mentorship, exposure to prosthodontics, and future need for the specialty, and (2) establish a baseline of students' perceptions of the impact of prosthodontics on salary, personal and patient quality of life, and the profession of dentistry. A survey was distributed to 494 predoctoral and advanced standing students at the University of Pennsylvania School of Dental Medicine. Questions focused on the perceptions and experiences with the specialty of prosthodontics. A total of 410 surveys were analyzed using Chi Square tests and univariate and multivariate analysis with statistical software. Response rate was 83%. A positive initial introduction to prosthodontics was reported by 57% of students. Most students had positive experiences with prosthodontic faculty and enjoyed laboratory work and challenging/complex dentistry. A greater need for prosthodontists in the future was perceived by 82% of respondents, with 63% reporting that the future of prosthodontics had been emphasized. Students reported (1) a preclinical course directed by prosthodontists and (2) working in the clinic with prosthodontic faculty (p salary (7(th) ), personal quality of life (5(th) ), patient quality of life (4(th) ), and strengthening of the dental field (7(th) ). Reasons few students are interested in prosthodontics as a career, despite a positive first introduction and high perceived future need for prosthodontists may be attributed to a number of factors. These include insufficient prosthodontically, trained faculty, lack of a mentorship program, lack of an advanced graduate program, a perception of feeling unprepared upon graduation, and misconception of potential income in prosthodontics. © 2012 by the American College of Prosthodontists.

  6. Preventive maintenance prosthodontics telescopic overdenture (a literature review

    Directory of Open Access Journals (Sweden)

    Muhammad Ardiansyah

    2016-06-01

    Full Text Available Missing of permanent teeth in adult patient without replacing them may lead to thedisturbance of such functions of mastication, aesthetics and phonetics. Besides, masticationorgans imbalance may happen, Missing of permanent teeth causing the more demand for replacing them that providesmore perfect elements which cannot be achieved by removable or fixed denture. Removable dentures attached by means of telescopic anchors are regarded to be a good clinical solution. This kind of restorations in patients with reduced and residual dentition gives an opportunity to reduce destructive rotational and horizontal occlusal forces by directing them more axially. It can also increase the stability of abutment teeth and protect them from pathologic migration, and, thus may enhance the functional effect of the prosthetic treatment.In addition to the Overdenture, can prevent alveolar bone resorption so that the denture does not quickly loose. This can be considered as a preventive treatment prosthodontics. This paper is expected to provide important information to save the remaining natural teeth, giving information retain natural teeth even with periodontal disorders and esthetics. Eventually provide an alternative solution in addition to conventional denture care. The conclusion is Overdenture treatment denture with telescopic been to improve the aesthetic, tooth retention, stabilization, and maintain the remaining teeth.

  7. Multicentre prospective evaluation of implant-assisted mandibular removable partial dentures: surgical and prosthodontic outcomes.

    Science.gov (United States)

    Payne, Alan G T; Tawse-Smith, Andrew; Wismeijer, Daniel; De Silva, Rohana K; Ma, Sunyoung

    2017-01-01

    To determine implant survival and prosthodontic maintenance of implant-assisted mandibular removable partial dentures in a multicentre prospective study up to 10 years. Forty-eight participants with mandibular distal extension partial dentures were selected. A control group of 12 New Zealand participants had new conventional mandibular partial dentures made. Three test groups of 36 participants in New Zealand (n = 12), the Netherlands (n = 12) and Colombia (n = 12) had bilateral distal implants placed. Surgical and prosthodontic outcomes were documented with only healing caps placed (Stage 1) and with an attachment system (Stage 2). No implants failed after 3 years. Four late implant failures in three participants occurred in New Zealand (two unilateral implant failures after 5 and 8 years and two bilateral implant failures in the same participant after 6 and 10 years); two unilateral late implant failures occurred in the Netherlands and no late failures in Colombia. Implant survival rate was 92% by 10 years. Resonance frequency measurements were taken at surgery implant stability quotient (ISQ) 62.44 ± 7.46; range 40 - 79), baseline (ISQ 63.22 ± 6.17; range 50 - 74) and after 3 years (ISQ 66.38 ± 6.77; range 55 - 83). In New Zealand and Colombia, measured crestal bone levels were 2.03 ± 0.71 mm and 2.20 ± 0.81 mm, respectively, at baseline and 3 years. For Stage I, principal prosthodontic maintenance issues were loose healing caps among 10 New Zealand participants, four Colombian participants and one Netherlands participant. For Stage 2, matrix activation and overdenture puncture fractures resulted in 41 events (25 participants) in New Zealand over 10 years, whilst over 3 years, there were 14 events in nine Colombian participants and six events in five Netherlands participants. This clinical multicentre research complements previous case reports, case series, retrospective and prospective studies on the notion of implant

  8. Gender disparities in prosthodontics: authorship and leadership, 13 years of observation.

    Science.gov (United States)

    Kongkiatkamon, Suchada; Yuan, Judy Chia-Chun; Lee, Damian J; Knoernschild, Kent L; Campbell, Stephen D; Sukotjo, Cortino

    2010-10-01

    The purpose of this study was to examine gender disparities in prosthodontics by reviewing the trend of female authorship in prosthodontic journals and exploring the role of female leadership in prosthodontic organizations and Advanced Education in Prosthodontic (AEP) programs. Three journals representing the prosthodontic specialty were selected to analyze the percentage of female dentist first and last (senior) authors for the years 1995, 2000, 2005, and 2008. Article inclusion criteria were restricted to the first or last authors who held at least a DMD/DDS/BDS degree and were from U.S. institutions. Data on female leadership in prosthodontic organizations and advanced education programs were collected, and the trends were studied. Descriptive statistics were used to analyze the data. A linear regression analysis was performed to investigate the proportion of female authorship compared to male in the dental literature. A Fisher's Exact Test was performed to contrast differences of female first and last authorship in the selected journals between years 1995 and 2008. Overall, there was no statistically significant linear increase in the proportion of either first or last female authorship compared to male authorship over time. With respect to each journal, the linear regression analysis showed that the increase of first female authorship was statistically significant (p= 0.016) compared to male authorship only in the Journal of Prosthetic Dentistry. The percentage of female presidents of prosthodontic organizations has been very limited. A similar trend was also observed in AEP program director positions. Over the past 13 years, female dentists' participation in prosthodontics literature authorship has not increased significantly in the United States. Furthermore, female involvement in prosthodontics leadership has been limited over the past decades. © 2010 by The American College of Prosthodontists.

  9. [Prosthodontic specialty training in the United States: what can we learn].

    Science.gov (United States)

    Qing, H

    2017-12-09

    Prosthodontics is one of the nine recognized specialties by American Dental Association. The postgraduate prosthodontic program used to train prosthodontic specialists in U S A started about 70 years ago. Compared to China which just launched the dental residency programs, the programs in U S A have more developed and relatively more mature education system. It is worthwhile for China to study and learn the U S A prosthodontic residency education program. Prosthodontics is a specialty to diagnose and treat complex dental problems, and is often considered as the 'orchestrator' directing and coordinating all the other dental specialists to manage complex situations. This specialty plays an important role in a nation's oral health system. The present article is aimed to introduce the history of US prosthodontic residency program, initial accreditation, curriculum, education standards and mechanisms of the residency program, and how the program is monitored and managed post initial accreditation, with the hope that this system can serve as a reference for China's developing its own residency program.

  10. Economic Outcomes in Prosthodontics

    NARCIS (Netherlands)

    Bassi, Francesco; Carr, Alan B.; Chang, Ting-Ling; Estafanous, Emad W.; Garrett, Neal R.; Happonen, Risto-Pekka; Koka, Sreenivas; Laine, Juhani; Osswald, Martin; Reintsema, Harry; Rieger, Jana; Roumanas, Eleni; Salinas, Thomas J.; Stanford, Clark M.; Wolfaardt, Johan

    2013-01-01

    Purpose: A systematic literature review was conducted to identify the types of economic measures currently used in implant prosthodontics and determine the degree to which cost of care is considered in the context of any positive outcome of the care provided. Materials and Methods: A literature

  11. Retrospective analysis of dental implants placed and restored by advanced prosthodontic residents.

    Science.gov (United States)

    Barias, Pamela A; Lee, Damian J; Yuan, Judy Chia-Chun; Sukotjo, Cortino; Campbell, Stephen D; Knoernschild, Kent L

    2013-02-01

    The purposes of this retrospective clinical review were to: (1) describe the demographics of implant patients, types of implant treatment and implant-supported prostheses in an Advanced Education in Prosthodontic Program, (2) evaluate the survival rate of dental implants placed by prosthodontic residents from 2006 to 2008, and (3) analyze the relationship between resident year of training and implant survival rate. All patients who received dental implants placed by prosthodontic residents from January 2006 to October of 2008 in the Advanced Prosthodontic Program at the University of Illinois at Chicago College of Dentistry were selected for this study. Age, gender, implant diameter, length, implant locations, surgical and restorative detail, and year of prosthodontic residency training were collected and analyzed. Life-table and Kaplan-Meier survival analyses were performed based on implants overall, locations, year of training, and use of a computer-generated surgical guide. A Logrank statistic was performed between implant survival and year of prosthodontic residency training, location, and use of computer-generated surgical guide (α= 0.05). Three hundred and six implants were placed, and of these, seven failed. Life-table and Kaplan-Meier analyses computed a cumulative survival rate (CSR) of 97% for overall implants and implants placed with a computer-generated surgical guide. No statistical difference was found in implant survival rates as a function of year of training (P= 0.85). Dental implants placed by prosthodontic residents had a CSR comparable to previously published studies by other specialties. The year of prosthodontic residency training and implant failure rate did not have any significant relationship. © 2012 by the American College of Prosthodontists.

  12. Ten-year survey of program directors: trends, challenges, and mentoring in prosthodontics. Part 1.

    Science.gov (United States)

    Munoz, Deborah M; Kinnunen, Taru; Chang, Brian M; Wright, Robert F

    2011-10-01

    This study consisted of two parts. Part 1 was a survey of US program directors, and Part 2 reports on the survey findings distributed to the deans of US dental schools. Both surveys evaluated observations of trends in prosthodontic education. The first survey (2005) of program directors and deans was published in 2007. This second survey was conducted in 2009. The 2009 survey provided 10-year data on trends in prosthodontics as reported by program directors. A national e-mail survey of 46 program directors was used to collect enrollment data for years 1 to 3 of prosthodontics training for US and international dental school graduates, the total number of applicants and applications considered, and the trends over time of applicants to prosthodontics for US dental school graduates and for international graduates. In addition, the program directors were asked to rank 13 key factors that may have contributed to any changes in the prosthodontic applicant pool. Program directors were also asked for information on student financial incentives and whether their programs were state or federally funded, and whether their sponsoring institution was a dental school. Of the 46 program directors, 40 responded, for an 87% response rate. Respondents reported that 66% of their enrollees were graduates of US dental schools. Between 2000 and 2009 the applicant pool in prosthodontics nearly doubled, with 50% of the program directors reporting an increase in US-trained applicants, 42.5% reporting no change, and only 7.5% reporting a decrease. Using the Spearman correlation for the 10-year survey, there was a positive, statistically significant correlation that society's demand for a higher level of training and credentialing and interest in prosthodontics among dental students contributed to an increase in the number of US dental graduates applying to prosthodontic programs. Only four programs offered no financial packages to offset tuition. The remaining 36 respondents reported some

  13. Prosthodontic Approach to Treat Obstructive Sleep Apnea ...

    African Journals Online (AJOL)

    Prosthodontic Approach to Treat Obstructive Sleep Apnea. ... Annals of Medical and Health Sciences Research ... disordered breathing represents a continuum, ranging from simple snoring sans sleepiness, upper‑airway resistance syndrome, obstructive sleep apnea (OSA) syndrome, to hypercapnic respiratory failure.

  14. Predictors of Prosthodontic Treatment-Related Behavior Using the Theory of Planned Behavior Framework.

    Science.gov (United States)

    Vieira, Antonio Helio; Castro e Silva, Donizete; Nogueira, Túlio Eduardo; Leles, Cláudio Rodrigues

    2016-01-01

    The Theory of Planned Behavior (TPB) was used to assess subjects' intentions and behavior to predict willingness to undergo prosthodontic care. A questionnaire was administered to 225 adults with history of teeth loss who currently were not under prosthodontic treatment. The questionnaire comprised TPB components (attitude toward behaviour [ATB], subjective norm [SN], and perceived behavioral control [PBC]) containing items with potential influence on the intentions and behavior of individuals toward prosthodontic care. Clinical and socioeconomic data were also assessed. A path regression model was constructed explaining two dependent variables simultaneously: one explained the influence of PBC on intention (R2=0.04) and another explained the influence of dental arch, position of lost teeth, socioeconomic status, and PBC on behavior (R2=0.31). It was concluded that PBC was a relevant TPB component that encompasses perception of costs, opportunity cost, perceived need, and access to dental care. Clinical and socioeconomic factors were also major determinants of behavior toward prosthodontic treatment.

  15. Biohazards associated with materials used in prosthodontics ...

    African Journals Online (AJOL)

    ... or systemically. Reliable research information using robust methodology is thus needed to clarify the various safety issues and frequency of adverse reactions in general dentistry, including prosthodontic treatment. Key words: Adverse effects, biocompatibility, formaldehyde, nanoparticles, polymeric restorative materials ...

  16. The extent of the psychological impairment of prosthodontic outpatients at a German University Hospital

    Directory of Open Access Journals (Sweden)

    Zimmer Stefan

    2008-10-01

    Full Text Available Abstract Background Psychological factors are not only important in patients with temporomandibular disorders (TMDs, but also in patients suffering from tooth loss and/or in those awaiting prosthodontic care with fixed or removable dentures as several authors emphasize. The purpose of the present prospective observational study was to compare prosthodontic outpatients of the Department of Prosthodontics at the University of Duesseldorf and patients seeking care at the TMD/Orofacial Pain Outpatient Clinic (TMD/OFPOC at the same university with respect to sociodemographic data, self-reported somatic complaints, and psychological impairment. Methods A total of 234 patients received two self-administered questionnaires including the Symptom-Check-List. Complete data have been obtained from 65 prosthodontic outpatients and 60 patients of the TMD/OFPOC. Results Results indicated statistically significant group differences regarding sociodemographic data and somatic complaints. Concerning the latter, in 11 of the 21 items, groups differed significantly and confirmed the absence of any mixing between the two outpatient clinics. Although the evaluation of psychological impairment revealed no significant group differences, in 21.9% of the prosthodontic outpatients and in 22.0% of the patients from the TMD/OFPOC, the extent of the determined psychological impairment was similar to that of psychotherapeutic outpatients; in 9.4% and 8.5% it was similar to that of psychotherapeutic inpatients, respectively. Conclusion Within the limitations of this study, in approximately one third of the evaluated patients of both the prosthodontic outpatient clinic and the TMD/OFPOC the psychological impairment reached values comparable to those of psychotherapeutic outpatients and psychotherapeutic inpatients. Therefore, the present findings emphasize the need to intensify the integration of psychosomatic aspects into dentistry and, in particular, to add psychological

  17. [Application of digital design of orthodontic-prosthodontic multidisciplinary treatment plan in esthetic rehabilitation of anterior teeth].

    Science.gov (United States)

    Liu, Y S; Li, Z; Zhao, Y J; Ye, H Q; Zhou, Y Q; Hu, W J; Liu, Y S; Xun, C L; Zhou, Y S

    2018-02-18

    To develop a digital workflow of orthodontic-prosthodontic multidisciplinary treatment plan which can be applied in complicated anterior teeth esthetic rehabilitation, in order to enhance the efficiency of communication between dentists and patients, and improve the predictability of treatment outcome. Twenty patients with the potential needs of orthodontic-prosthodontic multidisciplinary treatment to solve their complicated esthetic problems in anterior teeth were recruited in this study. Digital models of patients' both dental arches and soft tissues were captured using intra oral scanner. Direct prosthodontic (DP) treatment plan and orthodontic-prosthodontic (OP) treatment plan were carried out for each patient. For DP treatment plans, digital wax-up models were directly designed on original digital models using prosthodontic design system. For OP treatment plans, virtual-setups were performed using orthodontic analyze system according to orthodontic and esthetic criteria and imported to prosthodontic design system to finalize the digital wax-up models. These two treatment plans were shown to the patients and demonstrated elaborately. Each patient rated two treatment plans using visual analogue scales and the medians of scores of two treatment plans were analyzed using signed Wilcoxon test. Having taken into consideration various related factors, including time, costs of treatment, each patient chose a specific treatment plan. For the patients chose DP treatment plans, digital wax-up models were exported and printed into resin diagnostic models which would be utilized in the prosthodontic treatment process. For the patients chose OP treatment plans, virtual-setups were used to fabricate aligners or indirect bonding templates and digital wax-up models were also exported and printed into resin diagnostic models for prosthodontic treatment after orthodontic treatment completed. The medians of scores of DP treatment plan and OP treatment plan were calculated and

  18. Surgical, Orthodontic and Prosthodontic Rehabilitation of a Patient with Follicular Ameloblastoma: A Case Report

    Science.gov (United States)

    Sailer, Herman F.; Tarawneh, Fadi; Fourkas, Panagiotis; Antoniades, Dimitrios Z.; Athanasiou, Athanasios E.

    2010-01-01

    This case report describes the combined surgical, orthodontic and prosthodontic rehabilitation of an adult female patient with a previous history of follicular ameloblastoma, which was treated through partial mandibulectomy and an immediate replacement of missing bone with an autologous calvarial bone graft. Orthodontic treatment was undertaken in order to restore occlusal disturbances and obtain sufficient space for two dental implants and an optimum prosthodontic rehabilitation. PMID:20396452

  19. Designing Interventions that Last: A Classification of Environmental Behaviors in Relation to the Activities, Costs, and Effort Involved for Adoption and Maintenance

    Science.gov (United States)

    Moore, Harriet E.; Boldero, Jennifer

    2017-01-01

    Policy makers draw on behavioral research to design interventions that promote the voluntary adoption of environmental behavior in societies. Many environmental behaviors will only be effective if they are maintained over the long-term. In the context of climate change and concerns about future water security, behaviors that involve reducing energy consumption and improving water quality must be continued indefinitely to mitigate global warming and preserve scarce resources. Previous reviews of environmental behavior have focused exclusively on factors related to adoption. This review investigates the factors that influence both adoption and maintenance, and presents a classification of environmental behaviors in terms of the activities, costs, and effort required for both adoption and maintenance. Three categories of behavior are suggested. One-off behaviors involve performing an activity once, such as purchasing an energy efficient washing machine, or signing a petition. Continuous behaviors involve the performance of the same set of behaviors for adoption and for maintenance, such as curbside recycling. Dynamic behaviors involve the performance of different behaviors for adoption and maintenance, such as revegetation. Behaviors can also be classified into four categories related to cost and effort: those that involve little cost and effort for adoption and maintenance, those that involve moderate cost and effort for adoption and maintenance, those that involve a high cost or effort for adoption and less for maintenance, and those that involve less cost or effort for adoption and a higher amount for maintenance. In order to design interventions that last, policy makers should consider the factors that influence the maintenance as well as the adoption of environmental behaviors. PMID:29163265

  20. Comparison between flipped classroom and team-based learning in fixed prosthodontic education.

    Science.gov (United States)

    Nishigawa, Keisuke; Omoto, Katsuhiro; Hayama, Rika; Okura, Kazuo; Tajima, Toyoko; Suzuki, Yoshitaka; Hosoki, Maki; Shigemoto, Shuji; Ueda, Mayu; Rodis, Omar Marianito Maningo; Matsuka, Yoshizo

    2017-04-01

    We previously investigated the effects of team-based learning (TBL) on fixed prosthodontic education and reported that TBL could have higher efficiency with high student satisfaction than traditional lecture. In the current report, we introduced flipped classroom to the fixed prosthodontic education and compared their effectiveness based on the final examination score in addition to TBL. Participants were 41 students from Tokushima University School of Dentistry who attended a fixed prosthodontics course. The first six classes adopted the flipped classroom style while the latter eight classes adopted TBL. To evaluate the relationship between learning styles and their effectiveness, we compared results from the term-end examination between the curriculum covered by flipped classroom and TBL-style classes. To draw comparisons, a referential examination with the same questions was conducted to eight faculty members who had not attended any of these classes. Term-end examination results showed that TBL classes had slightly higher scores than flipped classroom classes. Referential examination results also showed higher scores for the same curriculum and no significant interaction was found between class formats and the term-end and referential examination scores. Analysis revealed no noticeable difference in the effectiveness of the class formats. Our previous study reported that TBL had higher efficiency than traditional style lecture. In the current study, there was no statistical difference in the examination score between flipped classroom and TBL. Therefore, we conclude that both styles are highly effective than traditional style lecture and constitute valid formats for clinical dental education. Copyright © 2016 Japan Prosthodontic Society. Published by Elsevier Ltd. All rights reserved.

  1. Mini implants for definitive prosthodontic treatment: a systematic review.

    Science.gov (United States)

    Bidra, Avinash S; Almas, Khalid

    2013-03-01

    Mini implants are commonly used in orthodontics and for interim prosthodontic treatment, but evidence for their use in definitive prosthodontic treatment is not clear. This systematic review evaluated the mini-implant literature to analyze short-term (1 to 5 years), medium-term (5 to 10 years), and long-term (beyond 10 years) survival rates when used for definitive prosthodontic treatment. An electronic search of the English language literature for articles published between January 1974 and May 2012 was performed by using PubMed and Cochrane databases with predetermined inclusion criteria. Key terms included in the search were mini dental implants, narrow diameter implants, reduced diameter implants, small diameter implants, transitional implants, interim implants, and provisional implants. After a systematic filtering process, the selected articles were subjected to a detailed review, and the data collected were used to calculate the 1-year interval survival rate (ISR) and the cumulative survival rate (CSR). The electronic database search yielded 1807 titles. By scrutinizing the titles and abstracts with inclusion and exclusion criteria, the researchers identified 9 studies of mini implants for definitive prosthodontic treatment. Of the studies identified, 1 was a randomized controlled trial, 2 were prospective studies, and 6 were retrospective studies. The majority of mini implants were placed by using a flapless surgical technique in the mandibular anterior region to support an overdenture. The 1st year ISR was 94.7% and the CSR over a 9-year period, primarily attributed to data from 1 study, was 92.2%. Most implants were immediately loaded and almost all implant failures occurred during the first year after implant placement. For short-term survival, the first year ISR of 94.7% of mini dental implants appears encouraging, but the true 1-year survival rate is unknown, as the minimum follow-up period reported for several implants was less than a year

  2. 3D workflows in orthodontics, maxillofacial surgery and prosthodontics

    NARCIS (Netherlands)

    van der Meer, Wicher Jurjen

    2016-01-01

    In this thesis different aspects of digital workflows in Orthodontics, Maxillofacial Surgery and Prosthodontics are discussed and, where possible, placed in a broader perspective thereby attempting to go both broader and deeper into the implications of the introduction of 3D digital technology in

  3. Missing Teeth and Prosthodontic Replacement in an Institutionalized Dentate Population of 60 Years and Older in Qingdao, China

    NARCIS (Netherlands)

    Zhang, Q.; Li, T.T.; Gerritsen, A.E.; Witter, D.J.; Bronkhorst, E.M.; Creugers, N.H.J.

    2016-01-01

    PURPOSE: The aim of this study was to investigate missing teeth and prosthodontic replacements in an institutionalized elderly population in China, and to assess dental functionality before and after the prosthodontic replacements based on a hierarchical dental functional classification (HDFC)

  4. Interdisciplinary interface between fixed prosthodontics and periodontics.

    Science.gov (United States)

    Abduo, Jaafar; Lyons, Karl M

    2017-06-01

    Although periodontal factors do not usually have a direct effect on the survival of a fixed prosthesis, harmony between the prosthesis and the periodontium is critical otherwise esthetics, the longevity of the prosthesis and the periodontium will be compromised. A close interdisciplinary relationship between periodontics and prosthodontics is therefore necessary to avoid an unsatisfactory treatment outcome, requiring extensive and expensive retreatment. The design of the prosthesis, the number and quality of the abutment teeth, the preparation and the pontic, the occlusion and the material need to be considered when planning prosthodontic treatment. The location of the preparation margin and the contour and emergence profile of the prosthesis will influence the response of the gingival tissues to the prosthesis. Pontic design and cleansibility also contribute to the response of the gingival tissues as well as to the clinical and esthetic outcome. Even an optimal pontic design will not prevent inflammation of the mucosa adjacent to the pontic if pontic hygiene is not maintained by removal of plaque. Case selection and the patients' ability to carry out adequate oral hygiene are therefore essential for longevity of the prosthesis, and regular reviews provide an opportunity for early detection and treatment of failures. © 2017 John Wiley & Sons A/S. Published by John Wiley & Sons Ltd.

  5. Women in Prosthodontics: A Brief Look at Pioneers, Leaders, and Inspirers.

    Science.gov (United States)

    Afshari, Fatemeh S; Yuan, Judy Chia-Chun; Sukotjo, Cortino

    2017-07-01

    There are several women pioneers in prosthodontics, and each deserves recognition and admiration for all she has achieved in helping bridge the gender gap in dentistry. Women have come a long way from being first depicted as a thieving woman assistant in early 1523 to becoming award-winning, Board-certified clinicians, program directors, department chairs, and deans of dental schools. However, current female resident membership in the American College of Prosthodontists is less than 40%. Women in leadership roles are still scarce, and advancement is still needed. This article provides a brief summary of the history of prosthodontics, highlighting prominent women prosthodontists and their stories, while providing inspiration for future prosthodontists, men as well as women. © 2017 by the American College of Prosthodontists.

  6. Effects of team-based learning on fixed prosthodontic education in a Japanese School of Dentistry.

    Science.gov (United States)

    Takeuchi, Hisahiro; Omoto, Katsuhiro; Okura, Kazuo; Tajima, Toyoko; Suzuki, Yoshitaka; Hosoki, Maki; Koori, Motoharu; Shigemoto, Shuji; Ueda, Mayu; Nishigawa, Keisuke; Rodis, Omar Marianito Maningo; Matsuka, Yoshizo

    2015-04-01

    The aims of this study were to evaluate the quality of team-based learning (TBL) in prosthodontics education for fourth-year dental students at Tokushima University School of Dentistry and to compare this teaching method with traditional lecture-based delivery. Participants in the study were 36 students (22 males and 14 females) who attended the TBL-style fixed prosthodontics course. Ten 60-minute classes were held. The first three were traditional lecture-style classes and were followed by one class introducing the TBL style. The remaining six classes constituted the TBL-format fixed prosthodontics course. The effectiveness of TBL was evaluated through student questionnaires at the end of each class and the results of the term-end examination. The questionnaire revealed high student approval for TBL-style learning, and active group discussion among students during TBL was a key factor in these ratings. In the results of the term-end examination, there were significantly higher scores on the questions that covered TBL-taught material than those covering traditional lecture-taught topics. The results of this study suggest that TBL-style lecture was more effective than traditional-style lecture for teaching fixed prosthodontics and that TBL was a more efficient mode of delivering dental education than traditional lecture-based teaching.

  7. Additive Manufacturing Techniques in Prosthodontics: Where Do We Currently Stand? A Critical Review.

    Science.gov (United States)

    Alharbi, Nawal; Wismeijer, Daniel; Osman, Reham B

    The aim of this article was to critically review the current application of additive manufacturing (AM)/3D-printing techniques in prosthodontics and to highlight the influence of various technical factors involved in different AM technologies. A standard approach of searching MEDLINE, EMBASE, and Google Scholar databases was followed. The following search terms were used: (Prosth* OR Restoration) AND (Prototype OR Additive Manufacture* OR Compute* OR 3D-print* OR CAD/CAM) AND (Dentistry OR Dental). Hand searching the reference lists of the included articles and personal connections revealed additional relevant articles. Selection criteria were any article written in English and reporting on the application of AM in prosthodontics from 1990 to February 2016. From a total of 4,290 articles identified, 33 were seen as relevant. Of these, 3 were narrative reviews, 18 were in vitro studies, and 12 were clinical in vivo studies. Different AM technologies are applied in prosthodontics, directly and indirectly for the fabrication of fixed metal copings, metal frameworks for removable partial dentures, and plastic mock-ups and resin patterns for further conventional metal castings. Technical factors involved in different AM techniques influence the overall quality, the mechanical properties of the printed parts, and the total cost and manufacturing time. AM is promising and offers new possibilities in the field of prosthodontics, though its application is still limited. An understanding of these limitations and of developments in material science is crucial prior to considering AM as an acceptable method for the fabrication of dental prostheses.

  8. Location of prosthodontic treatment and oral health-related quality of life--an exploratory study.

    Science.gov (United States)

    Sukumar, Smitha; John, Mike T; Schierz, Oliver; Aarabi, Ghazal; Reissmann, Daniel R

    2015-01-01

    Prosthodontic treatment has a positive effect on oral health-related quality of life (OHRQoL); however, there is a paucity of studies assessing the impact of OHRQoL based on where in the mouth ("location") the treatment is performed. This exploratory study investigated the association of the location (anterior, posterior region) of prosthodontic treatment with magnitude and nature of OHRQoL changes. In this non-randomized prospective clinical study, 190 adult patients (17-83 years) were recruited at baseline and 104 were available for the follow-up analyses. Of those, 50 patients received treatment only in the posterior segment and 54 patients in both anterior and posterior regions. Treatment included conventional fixed partial prostheses, removable prostheses or a combination of both. OHRQoL was assessed with the German language version of the 49-item Oral Health Impact Profile (OHIP) at baseline and the questionnaire was repeated 4-6 weeks post-treatment. Magnitude and effect size of changes in summary and sub-scale scores were calculated and data analyzed. Patients experienced a substantially impaired OHRQoL (mean OHIP score: 32.3 points) at baseline and an improvement in OHRQoL of 6.8 OHIP points following treatment. This study showed a greater improvement in OHRQoL in patients treated in both regions compared to those treated in the posterior region alone, especially in the function and aesthetic domains. This explorative study suggests that OHRQoL improvement is affected by where prosthodontic treatment is performed in the mouth. Greater understanding of qualitative aspects of reconstructive therapies is needed for improved treatment planning and patient consent. Copyright © 2014 Japan Prosthodontic Society. Published by Elsevier Ltd. All rights reserved.

  9. Developing Prosthodontic Residents' Communication Strategies with Edentulous Patients: A Pilot Study.

    Science.gov (United States)

    Murthy, Varsha; Sethuraman, K R; Choudhury, Sunayana; Shakila, P

    2017-11-01

    The aim of this study was to investigate whether prosthodontic residents' attitudes toward provider-client communication would be shaped by a tailor-made communications skills course. In 2016, the pre-intervention attitudes of all six second- and third-year prosthodontic residents in a three-year residency at an academic dental institution in India were assessed using the Communication Skills Attitude Scale (CSAS). The residents' performance was then video-recorded while they treated complete denture patients and was analyzed using the Kalamazoo scale, a validated scale for communication skills assessment. The residents' weaknesses were identified, and a custom-made generic module was designed along with individual guidance counseling for addressing aspects relevant to complete denture patients. The residents' attitudes were again assessed immediately after they completed the training using CSAS, as well as after two and four months using Balint sessions. Analysis of the recordings showed that few of the deficiencies during intraoral procedures were contextual, and the Kalamazoo scale did not address them: these were noted as being "beyond Kalamazoo." After the training, the residents reported awareness of their weaknesses and feeling motivated to practice their newly acquired skills. The Balint sessions showed that they had started valuing patients' agendas and the rapport-building process, and they reported transfer of skills when treating other types of prosthodontic patients. In this study, a customized communication skills module brought about a positive change in residents' attitudes, which was sustained over four months. Similar training could be implemented in other dental specialties.

  10. Prosthodontic perspective to all-on-4® concept for dental implants.

    Science.gov (United States)

    Taruna, M; Chittaranjan, B; Sudheer, N; Tella, Suchita; Abusaad, Md

    2014-10-01

    The clinical success and longevity of endosteal dental implants as load bearing abutments are controlled largely by the mechanical setting in which they function. The treatment plan is responsible for the design, number and position of the implants. In biomechanically compromised environment such as poor quality bone, strain to the crestal bone can be reduced by increasing the anterioposterior spread of implants, placement of longer implants and maximizing the number of implants. The All-on-4(®) concept is one such treatment procedure which enlightens us for its use in the completely edentulous patients and which also leaves behind the routine treatment alternative of conventional dentures with successful outcome in the short term, long term and the retrospective studies that have been done in the past. The area of concern for any treatment alternative lies in the success of the prosthesis and its prosthodontic perspective involving the principles of occlusion. This article reviews the All-on-4(®) concept and its prosthodontic aspects.

  11. Clinical epidemiologic concerns and the geriatric prosthodontic patient.

    Science.gov (United States)

    MacEntee, M I

    1994-11-01

    Investigations of the oral health of the elderly leave little doubt that disease and dysfunction are plentiful, although there is some debate on how the clinical observations translate into treatment needs. The problems appear to be greatest among the disabled and the institutionalized, whereas dentists generally show little enthusiasm for offering their services outside the confines of the traditional dental practice. Consequently the oral health concerns in the older population, and especially as they relate to prosthodontic treatment, remain substantially unanswered.

  12. Maintenance personnel performance simulation (MAPPS) model: overview and evaluation efforts

    International Nuclear Information System (INIS)

    Knee, H.E.; Haas, P.M.; Siegel, A.I.; Bartter, W.D.; Wolf, J.J.; Ryan, T.G.

    1984-01-01

    The development of the MAPPS model has been completed and the model is currently undergoing evaluation. These efforts are addressing a number of identified issues concerning practicality, acceptability, usefulness, and validity. Preliminary analysis of the evaluation data that has been collected indicates that MAPPS will provide comprehensive and reliable data for PRA purposes and for a number of other applications. The MAPPS computer simulation model provides the user with a sophisticated tool for gaining insights into tasks performed by NPP maintenance personnel. Its wide variety of input parameters and output data makes it extremely flexible for application to a number of diverse applications. With the demonstration of favorable model evaluation results, the MAPPS model will represent a valuable source of NPP maintainer reliability data and provide PRA studies with a source of data on maintainers that has previously not existed

  13. Corrosion behavior of dental alloys used for retention elements in prosthodontics.

    Science.gov (United States)

    Nierlich, Judith; Papageorgiou, Spyridon N; Bourauel, Christoph; Hültenschmidt, Robert; Bayer, Stefan; Stark, Helmut; Keilig, Ludger

    2016-06-01

    The purpose of this study was to investigate the corrosion behavior of 10 different high noble gold-based dental alloys, used for prosthodontic retention elements, according to ISO 10271. Samples of 10 high-noble and noble gold-based dental alloys were subjected to: (i) static immersion tests with subsequent analysis of ion release for eight different elements using mass spectrometry; (ii) electrochemical tests, including open-circuit potential and potentiodynamic scans; and (iii) scanning electron microscopy, followed by energy-dispersive X-ray microscopy. The results were analyzed using one-way ANOVA and Sidak multiple-comparisons post-hoc test at a level of significance of α = 0.05. Significant differences were found among the 10 alloys studied for all ions (P alloys. Scanning electron microscopy analysis confirmed the existence of typically small-diameter corrosion defects, whilst the energy-dispersive X-ray analysis found no significant alteration in the elemental composition of the alloys. The results of this study reveal the variability in the corrosive resistance among the materials used for retention elements in prosthodontics. © 2016 Eur J Oral Sci.

  14. An Assessment of the Risk of Bias in Randomized Controlled Trial Reports Published in Prosthodontic and Implant Dentistry Journals.

    Science.gov (United States)

    Papageorgiou, Spyridon N; Kloukos, Dimitrios; Petridis, Haralampos; Pandis, Nikolaos

    2015-01-01

    The objective of this study was to assess the risk of bias of randomized controlled trials (RCTs) published in prosthodontic and implant dentistry journals. The last 30 issues of 9 journals in the field of prosthodontic and implant dentistry (Clinical Implant Dentistry and Related Research, Clinical Oral Implants Research, Implant Dentistry, International Journal of Oral & Maxillofacial Implants, International Journal of Periodontics and Restorative Dentistry, International Journal of Prosthodontics, Journal of Dentistry, Journal of Oral Rehabilitation, and Journal of Prosthetic Dentistry) were hand-searched for RCTs. Risk of bias was assessed using the Cochrane Collaboration's risk of bias tool and analyzed descriptively. From the 3,667 articles screened, a total of 147 RCTs were identified and included. The number of published RCTs increased with time. The overall distribution of a high risk of bias assessment varied across the domains of the Cochrane risk of bias tool: 8% for random sequence generation, 18% for allocation concealment, 41% for masking, 47% for blinding of outcome assessment, 7% for incomplete outcome data, 12% for selective reporting, and 41% for other biases. The distribution of high risk of bias for RCTs published in the selected prosthodontic and implant dentistry journals varied among journals and ranged from 8% to 47%, which can be considered as substantial.

  15. Functional crown lengthening surgery in the aesthetic zone; periodontic and prosthodontic considerations.

    Science.gov (United States)

    Patel, Rajiv M; Baker, Paul

    2015-01-01

    Crown lengthening surgery aims to increase the amount of supragingival tooth tissue by resection of the soft and/or hard tissues to enable otherwise unrestorable teeth to be restored by increasing the retention and resistance forms of the teeth. Restoration of the worn dentition may require significant prosthodontic knowledge and skill. A prosthodontist should be involved from the beginning of the management of the patient. A number of key stages should be considered for correct management. Although the periodontist may guide the prosthodontist with regards to what may or may not be possible surgically, the overall treatment plan should be prosthodontically driven. Clinical Relevance: Toothwear of the anterior dentition provides a unique challenge to restore not only function but also to manage the aesthetic demands of the patient. To ensure that the correct outcome is reached, clinicians should be familiar with the normal anatomical proportions and relationships to enable planning and treatment to take place.

  16. Shortcomings of prosthodontic rehabilitation of patients living in long-term care facilities.

    Science.gov (United States)

    Steinmassl, P-A; Steinmassl, O; Kraus, G; Dumfahrt, H; Grunert, I

    2016-04-01

    Removable dentures are a non-invasive, cost-effective prosthodontic solution for the reduced dentition. Their intended purpose is the rehabilitation of harmonious oral function and aesthetics on a long-term basis. The prevalence of removable dentures among patients of advanced age is high and the quality of the dentures is often poor. The aim of this study was to find the most important shortcomings of removable dentures and address the main targets for improving the quality of prosthodontic rehabilitation. The records from dental check-ups in Austrian residential homes were analysed retrospectively. Dental anamnesis questionnaires and data from the clinical examinations of 105 denture wearers were analysed. The functional condition and retention of 192 dentures had been assessed, as well as the impact of the dentures on the intra-oral tissues. Insufficient denture retention was very common, particularly in the lower jaw (56·0%). Problems with the masticatory function were reported by 26.7% of the denture wearers, 11·4% were dissatisfied with the denture aesthetics, and 4·8% had difficulties with phonetics. Traumatic ulcers were found in 18·1%. Cracks, broken pieces (6·3%) or missing denture teeth (2·1%) were rare. It may be assumed that the findings of the present study also apply to a great percentage of community-dwelling seniors. The most important issues in prosthodontic rehabilitation with removable dentures are denture retention and masticatory function. Regular dental check-ups, denture adjustment and, when necessary, relining can maintain the primary denture quality and prevent damages of the oral tissues caused by ill-fitting dentures. © 2015 John Wiley & Sons Ltd.

  17. A Situational Maintenance Model

    DEFF Research Database (Denmark)

    Luxhoj, James T.; Thorsteinsson, Uffe; Riis, Jens Ove

    1997-01-01

    An overview of trend in maintenance management and presentation of a situational model and an analytical tools for identification of managerial efforts in maintenance.......An overview of trend in maintenance management and presentation of a situational model and an analytical tools for identification of managerial efforts in maintenance....

  18. Alternative prosthodontic-based treatment of a patient with hypocalcified type Amelogenesis Imperfecta.

    Science.gov (United States)

    Jivanescu, Anca; Miglionico, Antonio; Barua, Souman; Hategan, Simona Ioana

    2017-07-01

    The Amelogenesis Imperfecta is associated with malocclusion and usually requires an interdisciplinary treatment. Due to the patient's refusal of orthodontic treatment, prosthodontics-based treatments alternative was considered and planned. The patient was treated with zirconia-based fixed partial dentures, which resulted in improved occlusion, better oral health, and improved esthetic appearance.

  19. Trends in Computer-Aided Manufacturing in Prosthodontics: A Review of the Available Streams

    Science.gov (United States)

    Bennamoun, Mohammed

    2014-01-01

    In prosthodontics, conventional methods of fabrication of oral and facial prostheses have been considered the gold standard for many years. The development of computer-aided manufacturing and the medical application of this industrial technology have provided an alternative way of fabricating oral and facial prostheses. This narrative review aims to evaluate the different streams of computer-aided manufacturing in prosthodontics. To date, there are two streams: the subtractive and the additive approaches. The differences reside in the processing protocols, materials used, and their respective accuracy. In general, there is a tendency for the subtractive method to provide more homogeneous objects with acceptable accuracy that may be more suitable for the production of intraoral prostheses where high occlusal forces are anticipated. Additive manufacturing methods have the ability to produce large workpieces with significant surface variation and competitive accuracy. Such advantages make them ideal for the fabrication of facial prostheses. PMID:24817888

  20. Trends in Computer-Aided Manufacturing in Prosthodontics: A Review of the Available Streams

    Directory of Open Access Journals (Sweden)

    Jaafar Abduo

    2014-01-01

    Full Text Available In prosthodontics, conventional methods of fabrication of oral and facial prostheses have been considered the gold standard for many years. The development of computer-aided manufacturing and the medical application of this industrial technology have provided an alternative way of fabricating oral and facial prostheses. This narrative review aims to evaluate the different streams of computer-aided manufacturing in prosthodontics. To date, there are two streams: the subtractive and the additive approaches. The differences reside in the processing protocols, materials used, and their respective accuracy. In general, there is a tendency for the subtractive method to provide more homogeneous objects with acceptable accuracy that may be more suitable for the production of intraoral prostheses where high occlusal forces are anticipated. Additive manufacturing methods have the ability to produce large workpieces with significant surface variation and competitive accuracy. Such advantages make them ideal for the fabrication of facial prostheses.

  1. Prosthodontic management of a patient with ectodermal dysplasia.

    Science.gov (United States)

    Nandini, Yamini

    2013-12-01

    Ectodermal dysplasia is a rare congenital disease that affects the ectodermal structures. It is characterized by hypotrichosis, hypohidrosis and hypodontia. A 14-year-old boy with ectodermal dysplasia presenting with oligodontia and marked resorption of the maxillary and mandibular alveolar ridges is reported. Prosthetic rehabilitation in the form of a maxillary and mandibular partial denture was made with metal crowns on existing lower teeth to achieve appropriate vertical dimension. Significant improvement in speech, masticatory function and facial esthetics was achieved. Removable prosthodontics can provide an acceptable solution to esthetic, functional and psychological rehabilitation in patients with ectodermal dysplasia.

  2. Publication of statistically significant research findings in prosthodontics & implant dentistry in the context of other dental specialties.

    Science.gov (United States)

    Papageorgiou, Spyridon N; Kloukos, Dimitrios; Petridis, Haralampos; Pandis, Nikolaos

    2015-10-01

    To assess the hypothesis that there is excessive reporting of statistically significant studies published in prosthodontic and implantology journals, which could indicate selective publication. The last 30 issues of 9 journals in prosthodontics and implant dentistry were hand-searched for articles with statistical analyses. The percentages of significant and non-significant results were tabulated by parameter of interest. Univariable/multivariable logistic regression analyses were applied to identify possible predictors of reporting statistically significance findings. The results of this study were compared with similar studies in dentistry with random-effects meta-analyses. From the 2323 included studies 71% of them reported statistically significant results, with the significant results ranging from 47% to 86%. Multivariable modeling identified that geographical area and involvement of statistician were predictors of statistically significant results. Compared to interventional studies, the odds that in vitro and observational studies would report statistically significant results was increased by 1.20 times (OR: 2.20, 95% CI: 1.66-2.92) and 0.35 times (OR: 1.35, 95% CI: 1.05-1.73), respectively. The probability of statistically significant results from randomized controlled trials was significantly lower compared to various study designs (difference: 30%, 95% CI: 11-49%). Likewise the probability of statistically significant results in prosthodontics and implant dentistry was lower compared to other dental specialties, but this result did not reach statistical significant (P>0.05). The majority of studies identified in the fields of prosthodontics and implant dentistry presented statistically significant results. The same trend existed in publications of other specialties in dentistry. Copyright © 2015 Elsevier Ltd. All rights reserved.

  3. In vitro shear bond strength of cementing agents to fixed prosthodontic restorative materials.

    Science.gov (United States)

    Piwowarczyk, Andree; Lauer, Hans-Christoph; Sorensen, John A

    2004-09-01

    Durable bonding to fixed prosthodontic restorations is desirable; however, little information is available on the strength of the bond between different cements and fixed prosthodontic restorative materials. This study determined the shear-bond strength of cementing agents to high-gold-content alloy castings and different dental ceramics: high-strength aluminum oxide (Procera AllCeram), leucite-reinforced (IPS Empress), and lithium disilicate glass-ceramic (IPS Empress 2). Prepolymerized resin composite cylinders (5.5 mm internal diameter, n=20) were bonded to the pretreated surfaces of prosthodontic materials. High-gold-content alloy and high-strength aluminum oxide surfaces were airborne-particle-abraded, and pressable ceramics were hydrofluoric acid-etched and silanized prior to cementing. The cementing agents tested were a zinc-phosphate cement (Fleck's zinc cement), glass ionomer cements (Fuji I, Ketac-Cem), resin-modified glass ionomer cements (Fuji Plus, Fuji Cem, RelyX Luting), resin cements (RelyX ARC, Panavia F, Variolink II, Compolute), and a self-adhesive universal resin cement (RelyX Unicem). Half the specimens (n=10) were tested after 30 minutes; the other half (n=10) were stored in distilled water at 37 degrees C for 14 days and then thermal cycled 1000 times between 5 degrees C and 55 degrees C prior to testing. Shear-bond strength tests were performed using a universal testing machine at a constant crosshead speed of 0.5 mm/min. Statistical analysis was performed by multifactorial analysis of variance taking interactions between effects into account. For multiple paired comparisons, the Tukey method was used (alpha=.05). In a 3-way ANOVA model, the main factors substrate, cement, time, and all corresponding interactions were statistically significant (all P <.0001). In subsequent separate 1-way or 2-way ANOVA models for each substrate type, significant differences between cement types and polymerizing modes were found (all P <.001). None of the

  4. Virtual reality image applications for treatment planning in prosthodontic dentistry.

    Science.gov (United States)

    Ogawa, Takumi; Ikawa, Tomoko; Shigeta, Yuko; Kasama, Shintaro; Ando, Eriko; Fukushima, Shunji; Hattori, Asaki; Suzuki, Naoki

    2011-01-01

    For successful occlusal reconstruction, the prosthodontists must take several points into consideration, such as those involving issues with functional and morphological findings and aesthetics. They then must unify this information into a coherent treatment plan. In this present study we focused on prosthodontic treatment and investigated how treatment planning and simulation could be applied to two cases. The personal occlusion condition can be reproduced on the virtual articulator in VR space. In addition, various simulations can be performed that involve prosthetesis design.

  5. Oral hygiene and gingival health in patients with fixed prosthodontic appliances--a 12-month follow-up.

    Science.gov (United States)

    Ortolan, Sladana Milardović; Viskić, Josko; Stefancić, Sanja; Sitar, Ksenija Rener; Vojvodić, Denis; Mehulić, Ketij

    2012-03-01

    The aim of this study was to assess and observe the oral hygiene and gingival condition in patients before and after fixed prosthodontic therapy through a 12-month period in combination with oral hygiene instructions. It was also analysed how factors, such as type of fixed prosthodontic appliance, constructive material, the position of a fixed partial denture (FPD) in the mouth, age and gender influenced oral hygiene. The dental arches were divided into three segments each and teeth and gingiva were examined using the Plaque and Gingiva Index by Silness and Löe, and for the mineralized deposits assessment the Calculus Index by Green and Vermillion was employed. The preliminary examination was conducted before the prosthodontic therapy, and the reexaminations were carried out 14 days, 1, 6 and 12 months after crown and/or FPD placement. A total of 93 subjects from the original study group of 146 patients attended all clinical examinations, while the rest was excluded. The sample consisted of 60 women, 33 men at age between 21 and 95 (average 51.8). A total of 39 patients had single crowns (C), 50 FPDs and 5 C+FPD. The frequency of plaque found during the preliminary visit was higher than that found in the other periods (p oral hygiene levels than patients with FPDs or C+FPDs (p = 0.001). Our results revealed no significant difference in oral hygiene status among patients with FPDs made of different materials (p = 0.083). The worst hygiene levels were found in patients with fixed prosthodontic appliances in both jaws (p = 0.012). Younger patients showed better hygiene levels than the older ones (p = 0.002). Our research showed that appropriate educational and motivational measures can lead to improved oral hygiene, even after FPD placement. Presumably, the oral health in a group of adult patients can be kept acceptable by providing a prophylactic oral hygiene program.

  6. Prosthodontic rehabilitation of AIDS Patients: An Overview

    Directory of Open Access Journals (Sweden)

    Y K Singla

    2018-01-01

    Full Text Available Procurement for high standard of oral hygiene is a cardinal requirement for any individual and dentists constantly aim to provide optimal treatment to their patients. However, when it comes to treat patients with immunocompromised diseases, particularly those attached with social stigma like AIDS/HIV, there remain doubts and hesitations. This may lead the dentists to break the ethical responsibility by abjuring or not providing adequate treatment to these patients. Such situations can easily be avoided with absolute knowledge and awareness among the oral health-care providers including prosthodontist regarding the disease process, its connotations and measures to be taken during their treatment. This article summarizes the fundamental points in the prosthodontic management of immunocompromised patients which in the opinion of the author may be easily consolidated in dental practice.

  7. Impact of systemic diseases on oral health related quality of life after implant-prosthodontic rehabilitation

    Directory of Open Access Journals (Sweden)

    Tina Pretnar

    2014-08-01

    Full Text Available Background: Implant-prosthodontic rehabilitation improves oral health related quality of life (OHRQoL, but the presence of systemic diseases can also affect the well-being of an individual.The study was carried out to determine the relationship between systemic diseases and OHRQoL after implant-prosthodontic rehabilitation on the basis of psychometric testing by a standardized questionnaire »Oral Health Impact Profile« (OHIP.Methods: 130 patients, who received one to eight Ankylos® implants (on average 2.6 ± 1.8 were included in this retrospective study in which all aspects of the OHRQoL construct were evaluated with a Slovenian version of the OHIP questionnaire. Data on all present systemic diseases were obtained from the existing health records. Dental status and dental restorations were identified on the basis of orthopantomographic images.Results: The majority of subjects had a cardiovascular disease (N = 37; 28.5 %, followed by a headache (N = 15, 11.5 %, allergies and asthma (n = 13, 10 %, and a rheumatic disease (N = 11, 8.5 %. Only osteoporosis was statistically significantly related to OHRQoL after implant-prosthodontic rehabilitation (p = 0.024. The best multiple linear regression model for the summary score for the questionnaire »Oral Health Impact Profile« for Slovenia (OHIP, and taking into account gender and age as confounding factors, included the number of remaining teeth and the presence of osteoporosis (p = 0.003, adjusted R2 = 0.104.Conclusions: The total number of remaining teeth in the oral cavity (p = 0.031, the presence of osteoporosis (p = 0.024, and taking into account the subject’s gender and age, are the most important clinical factors that affect the functioning of the SGS as well as psychosocial behavior of the patients after an implant-prosthodontic rehabilitation (adjusted R2 = 0.104. Other systemic diseases (cardiovascular disease, headache, allergies and

  8. The effect of skeletal pattern on determining articulator settings for prosthodontic rehabilitation: an in vivo study.

    LENUS (Irish Health Repository)

    Canning, Tom

    2011-01-01

    During extensive prosthodontic treatment, the use of an accurately adjusted articulator is recommended to simulate mandibular movements. This clinical study was undertaken to assess any possible effect of the underlying skeletal pattern on programming articulator settings.

  9. Methodological quality and descriptive characteristics of prosthodontic-related systematic reviews.

    Science.gov (United States)

    Aziz, T; Compton, S; Nassar, U; Matthews, D; Ansari, K; Flores-Mir, C

    2013-04-01

    Ideally, healthcare systematic reviews (SRs) should be beneficial to practicing professionals in making evidence-based clinical decisions. However, the conclusions drawn from SRs are directly related to the quality of the SR and of the included studies. The aim was to investigate the methodological quality and key descriptive characteristics of SRs published in prosthodontics. Methodological quality was analysed using the Assessment of Multiple Reviews (AMSTAR) tool. Several electronic resources (MEDLINE, EMBASE, Web of Science and American Dental Association's Evidence-based Dentistry website) were searched. In total 106 SRs were located. Key descriptive characteristics and methodological quality features were gathered and assessed, and descriptive and inferential statistical testing performed. Most SRs in this sample originated from the European continent followed by North America. Two to five authors conducted most SRs; the majority was affiliated with academic institutions and had prior experience publishing SRs. The majority of SRs were published in specialty dentistry journals, with implant or implant-related topics, the primary topics of interest for most. According to AMSTAR, most quality aspects were adequately fulfilled by less than half of the reviews. Publication bias and grey literature searches were the most poorly adhered components. Overall, the methodological quality of the prosthodontic-related systematic was deemed limited. Future recommendations would include authors to have prior training in conducting SRs and for journals to include a universal checklist that should be adhered to address all key characteristics of an unbiased SR process. © 2013 Blackwell Publishing Ltd.

  10. Elders with implant overdentures: a 22-year clinical report.

    Science.gov (United States)

    Alsabeeha, Nabeel H M

    2012-09-01

    To report on the long-term survival and prosthodontic maintenance of two edentulous adults with mandibular overdentures supported by hydroxyapatite (HA)-coated implants. Mandibular implant overdentures are a successful treatment option with positive impact on the quality of life of elderly edentulous adults. Long-term survival of the implants requires continued rigorous prosthodontic maintenance. Two elderly edentulous adults with mandibular overdentures supported by 2 HA-coated implants were presented for prosthodontic rehabilitation after 22 years of placement. The implants were osseo-integrated and surviving at presentation based on accepted criteria. The mandibular implant overdentures suffered recurrent loss of retention and stability. Prosthodontic treatment involving the replacement of defective attachment systems and construction of new sets of mandibular implant overdentures opposing complete maxillary dentures is presented. The long-term survival of mandibular 2-implant overdentures requires continued prosthodontic maintenance. A conservative approach in the rehabilitation of two older edentulous adults with mandibular 2-implant overdentures was described including proper selection of attachment systems. © 2012 The Gerodontology Society and John Wiley & Sons A/S.

  11. Performance of two different digital evaluation systems used for assessing pre-clinical dental students' prosthodontic technical skills.

    Science.gov (United States)

    Gratton, D G; Kwon, S R; Blanchette, D R; Aquilino, S A

    2017-11-01

    Proper integration of newly emerging digital assessment tools is a central issue in dental education in an effort to provide more accurate and objective feedback to students. The study examined how the outcomes of students' tooth preparation were correlated when evaluated using traditional faculty assessment and two types of digital assessment approaches. Specifically, incorporation of the Romexis Compare 2.0 (Compare) and Sirona prepCheck 1.1 (prepCheck) systems was evaluated. Additionally, satisfaction of students based on the type of software was evaluated through a survey. Students in a second-year pre-clinical prosthodontics course were allocated to either Compare (n = 42) or prepCheck (n = 37) systems. All students received conventional instruction and used their assigned digital system as an additional evaluation tool to aid in assessing their work. Examinations assessed crown preparations of the maxillary right central incisor (#8) and the mandibular left first molar (#19). All submissions were graded by faculty, Compare and prepCheck. Technical scores did not differ between student groups for any of the assessment approaches. Compare and prepCheck had modest, statistically significant correlations with faculty scores with a minimum correlation of 0.3944 (P = 0.0011) and strong, statistically significant correlations with each other with a minimum correlation of 0.8203 (P < 0.0001). A post-course student survey found that 55.26% of the students felt unfavourably about learning the digital evaluation protocols. A total of 62.31% felt favourably about the integration of these digital tools into the curriculum. Comparison of Compare and prepCheck showed no evidence of significant difference in students' prosthodontics technical performance and perception. © 2016 John Wiley & Sons A/S. Published by John Wiley & Sons Ltd.

  12. Development and evaluation of learning module on clinical decision-making in Prosthodontics.

    Science.gov (United States)

    Deshpande, Saee; Lambade, Dipti; Chahande, Jayashree

    2015-01-01

    Best practice strategies for helping students learn the reasoning skills of problem solving and critical thinking (CT) remain a source of conjecture, particularly with regard to CT. The dental education literature is fundamentally devoid of research on the cognitive components of clinical decision-making. This study was aimed to develop and evaluate the impact of blended learning module on clinical decision-making skills of dental graduates for planning prosthodontics rehabilitation. An interactive teaching module consisting of didactic lectures on clinical decision-making and a computer-assisted case-based treatment planning software was developed Its impact on cognitive knowledge gain in clinical decision-making was evaluated using an assessment involving problem-based multiple choice questions and paper-based case scenarios. Mean test scores were: Pretest (17 ± 1), posttest 1 (21 ± 2) and posttest 2 (43 ± 3). Comparison of mean scores was done with one-way ANOVA test. There was overall significant difference in between mean scores at all the three points (P posttest 1 > pretest. Blended teaching methods employing didactic lectures on the clinical decision-making as well as computer assisted case-based learning can be used to improve quality of clinical decision-making in prosthodontic rehabilitation for dental graduates.

  13. Patient preference and satisfaction with implant-supported mandibular overdentures retained with ball or locator attachments: a crossover clinical trial.

    Science.gov (United States)

    Krennmair, Gerald; Seemann, Rudolf; Fazekas, Andres; Ewers, Rolf; Piehslinger, Eva

    2012-01-01

    To determine patient satisfaction and preference for implant-supported mandibular overdentures (IOD) retained with ball or Locator attachments. In addition, peri-implant conditions and prosthodontic maintenance efforts for the final attachments were evaluated after 1 year of function. In this crossover clinical trial, 20 edentulous patients were recruited to receive two mandibular implants in the canine region and were provided with implant-retained mandibular overdentures and new complete maxillary dentures. Implant-retained mandibular overdentures were stabilized with either ball attachments or Locator attachments, in random order. After 3 months of function, the attachments in the existing denture were changed. Questionnaires on satisfaction/complaints with the prostheses were administered at baseline (with the old dentures) and after 3 months of function with each attachment, thus providing for an intraindividual comparison. The decision for the final attachment chosen was based on the patient's preference. For the definitive attachment, peri-implant conditions (peri-implant marginal bone resorption, pocket depth, and Plaque Index, Gingival Index, and Bleeding Index) as well as prosthodontic maintenance efforts and satisfaction score were evaluated after an insertion period of 1 year. Nineteen (95%) patients completed the study (1 dropout). Patient satisfaction improved significantly (P<.05) from baseline (old dentures) to the new prostheses retained with each of the two attachment types for all domains of satisfaction. However, there were no differences between ball or Locator attachment for any items of satisfaction evaluated and neither attachment had a significant patient preference. No differences for peri-implant parameters or for patient satisfaction were noted between the definitive attachments (ball, n=10; Locator, n=9) after 1 year. Although the overall incidence rate of prosthodontic maintenance did not significantly differ between both retention

  14. A survey of U.S. prosthodontists and dental schools on the current materials and methods for final impressions for complete denture prosthodontics.

    Science.gov (United States)

    Petrie, Cynthia S; Walker, Mary P; Williams, Karen

    2005-12-01

    The purpose of this study was to survey members of The American College of Prosthodontists (ACP) to evaluate current materials and methods for final impressions for complete denture prosthodontics in the United States. In addition, those methods were compared with methods and materials taught in U.S. dental schools via a second survey sent to the chairpersons of prosthodontic/restorative departments. An anonymous questionnaire was mailed to all 1762 active ACP members in the United States in 2003. A slightly modified questionnaire was also distributed to chairpersons of prosthodontic/restorative departments in the 54 U.S. dental schools. Data analysis was performed via frequency distribution and chi-square statistics. Nine hundred and forty-five questionnaires were returned by members of the ACP (54% return rate) and 42 questionnaires were returned by the U.S. dental schools (78% return rate). The majority of the reporting prosthodontists (88%) and dental schools (98%) use a border-molded custom tray for final impressions for complete denture prosthodontics. The most popular material for border molding was plastic modeling compound (67% of reporting ACP members, and 95% of the responding dental schools). Variability of the materials used for final impressions was observed, with the most popular materials being polyvinylsiloxane for the ACP members (36%) and polysulfide for the dental schools (64%). Statistically significant differences were found in the materials used for border molding by prosthodontists based on the time elapsed since completion of prosthodontic training. No differences were found in the materials used for impression of edentulous arches based on years of experience. Geographic location did not influence the materials and methods used by prosthodontists for complete denture final impressions. There was variability of the materials and techniques used for final impressions by ACP members and dental schools; however, overall there was an agreement

  15. Content and goals of preclinical prosthodontic programs at german-language dental schools.

    Science.gov (United States)

    Hey, Jeremias; Stimmelmayr, Michael; Hirsch, Christian; Beuer, Florian

    2014-04-01

    The Association for Dental Education in Europe (ADEE) makes recommendations regarding the skills graduates of European dental schools need to achieve and advises dental schools regarding necessary changes to be made to the curriculum. In 2010 to 2011, a survey was conducted in German-language dental schools to validate the curricula and goals of preclinical prosthodontic programs with regard to laboratory work. The survey was mailed to the course instructors of the preclinical programs at 37 dental schools. Of these, 35 schools returned the completed survey, resulting in a response rate of 95%. Bent wire, wax-up exercises, metal-ceramic single crowns, fixed dental prostheses, cast metal single crowns, temporary removable dental prostheses, and full dentures were part of the dental laboratory work at most schools; however, most instructors considered laboratory work as less important, and there were few similarities among the programs in this area. According to the instructors responsible for preclinical education, honing of fine motor skills, realistic self-assessment, and the ability to work independently were the main goals of the programs. The results of this survey show that with regard to laboratory work, there were more differences than similarities among preclinical prosthodontic programs at German-language dental schools, contrary to the recommendations of the ADEE. These findings should be taken into account when program reforms are planned. © 2013 by the American College of Prosthodontists.

  16. Dental Students' Perceived Clinical Competence in Prosthodontics: Comparison of Traditional and Problem-Based Learning Methodologies.

    Science.gov (United States)

    Montero, Javier; Dib, Abraham; Guadilla, Yasmina; Flores, Javier; Santos, Juan Antonio; Aguilar, Rosa Anaya; Gómez-Polo, Cristina

    2018-02-01

    The aim of this study was to compare the perceived competence for treating prosthodontic patients of two samples of fourth-year dental students: those educated using traditional methodologies and those educated using problem-based learning (PBL). Two cohorts of fourth-year dental students at a dental school in Spain were surveyed: the traditional methods cohort (n=46) was comprised of all students in academic years 2012 and 2013, and the PBL cohort (n=57) was comprised of all students in academic years 2014 and 2015. Students in both cohorts reported the number of prosthodontic treatments they carried out per year and their perceived level of competence in performing such treatments. The results showed that the average number of treatments performed was similar for the two cohorts, except the number of metal-based removable partial dentures was significantly higher for students in the traditional (0.8±1.0) than the PBL (0.4±0.6) cohort. The level of perceived competence to treat complete denture patients for the combined cohorts was significantly higher (7.3±1.1) than that for partial acrylic dentures (6.7±1.5) and combined dentures (5.7±1.3). Students' clinical competence in prosthodontics mainly depended on number of treatments performed as the operator as well as the assistant. Students in the traditional methods cohort considered themselves to be significantly more competent at treating patients for removable partial and fixed prostheses (7.8±1.1 and 7.6±1.1, respectively) than did students in the PBL cohort (6.4±1.5 and 6.6±1.5, respectively). Overall, however, the study found that practical experiences were more important than the teaching method used to achieve students' perceived competence.

  17. BARC's efforts towards maintenance of water quality

    International Nuclear Information System (INIS)

    Kamath, P.R.

    1978-01-01

    Some of the studies pursued at the Environmental Survey Laboratories (ESLs) established at the site of nuclear installations in India are discussed. Each site has its special features and these ESLs monitor radioactive pollution in the environment including Man. The major objective of the surveillance programme at nuclear sites is the maintenance of water quality. Environmental investigations carried out to collect data on individual organisms, recipient water characteristics, thermal pollution and its effect on fish are described. (K.M.)

  18. A combined prosthodontic and orthodontic treatment approach in a case of growth inhibition induced by dental implants: a case report.

    Science.gov (United States)

    Krieger, Elena; Wegener, Joachim; Wagner, Wilfried; Hornikel, Sandra; Wehrbein, Heinrich

    2012-01-01

    Functional and esthetic results can improve significantly when a combined prosthodontic-orthodontic treatment approach is employed in cases requiring extensive oral rehabilitation. The patient presented in this case report was treated in his late teens with dental implants as a replacement for his maxillary incisors. Ten years later, the entire maxillary anterior segment was in infraocclusion compared to the rest of the dentition and lip line. Since prosthodontic follow-up treatment alone could not achieve an optimal functional and esthetic outcome, the patient was treated orthodontically prior to renewing the restoration. A fixed appliance was used to intrude the mandibular anterior teeth as well as vertically align the infrapositioned maxillary lateral incisors.

  19. Maxillofacial prosthodontic rehabilitation of a patient with oral complications during and after multimodality therapy for the management of oral squamous cell carcinoma.

    Science.gov (United States)

    Acharya, Varun; Chambers, Mark S

    2015-06-01

    Multimodality cancer therapy involving surgical resection, chemotherapy, and radiation therapy is frequently employed in the management of head and neck cancer. Patients who have undergone such therapy face substantial challenges during and after treatment. Prosthodontic rehabilitation is essential during and after tumor ablation to restore function, esthetics, and minimize interruption in daily routine. This clinical report describes the challenges faced by a patient undergoing multimodality therapy for a squamous cell carcinoma of the maxillary sinus and the stages involved in prosthodontic rehabilitation. Copyright © 2015 Editorial Council for the Journal of Prosthetic Dentistry. Published by Elsevier Inc. All rights reserved.

  20. An insight into the future beckons of maxillofacial prosthodontics: Anaplastology

    Directory of Open Access Journals (Sweden)

    S Padmaja

    2015-01-01

    Full Text Available It is the god given right of every human being to appear human. Few areas of dentistry offer more challenges to the technical skills or greater satisfaction for the successful rehabilitation of function and esthetics in the patient with gross anatomic defects and deformities of the maxillofacial region. Although remarkable advances in the surgical management of oral and facial defects, but cannot be satisfactorily repaired by plastic surgery alone. Hence, the demand for maxillofacial prosthetic devices for the rehabilitation of patients with congenital or acquired defects has intensified in recent years. This paper gives an insight into the latest innovations and improvisations in the field of maxillofacial prosthodontics.

  1. Students' perceptions of materials and techniques used at European dental schools in the education of fixed prosthodontics

    NARCIS (Netherlands)

    Brand, H.S.; Kamell, H.; Kharbanda, A.; Dozic, A.

    2013-01-01

    The aim of this study was to explore the materials and procedures used by students in dental schools across Europe for teaching fixed prosthodontics. An online questionnaire, containing twenty-eight dichotomous, multiple-choice, and Likert scale rating questions, was sent to students in forty dental

  2. A 3-year prospective clinical study of telescopic crown, bar, and locator attachments for removable four implant-supported maxillary overdentures.

    Science.gov (United States)

    Zou, Duohong; Wu, Yiqun; Huang, Wei; Wang, Feng; Wang, Shen; Zhang, Zhiyong; Zhang, Zhiyuan

    2013-01-01

    To evaluate telescopic crown (TC), bar, and locator attachments used in removable four implant-supported overdentures for patients with edentulous maxillae. A total of 30 maxillary edentulous patients were enrolled in a 3-year prospective study. Ten patients (group A) were treated with overdentures supported by TCs, 10 patients (group B) with overdentures supported by bar attachments, and 10 patients (group C) with overdentures supported by locator attachments. A total of 120 implants were used to restore oral function. During the 3-year follow-up period, implant survival and success rates, biologic and mechanical complications, prosthodontic maintenance efforts, and patient satisfaction were evaluated. All 30 patients were available for the 3-year follow-up and exhibited 100% implant survival and success rates. Peri-implant marginal bone resorption was not statistically significant for the three groups. There were lower plaque, bleeding, gingiva, and calculus indices in group C compared with groups A and B. The number of prosthodontic maintenance visits revealed eight complications in the TC group, seven complications in the bar group, and four complications in the locator group. However, there were no differences in the clinical effects of the overdentures in the three groups. Within the limits of this prospective study, it was concluded that the locator system produced superior clinical results compared with the TC and bar attachments in terms of peri-implant hygiene parameters, the frequency of prosthodontic maintenance measures, cost, and ease of denture preparation. However, longer-term prospective studies are required to confirm these results.

  3. Development of plant maintenance systems

    International Nuclear Information System (INIS)

    Tomita, Jinji; Ike, Masae; Nakayama, Kenji; Kato, Hisatomo

    1989-01-01

    Toshiba is making active efforts for the continuing improvement of reliability and maintainability of operating nuclear power plants. As a part of these efforts, the company has developed new maintenance administration systems, diagnostic monitoring facilities for plant equipments, computer-aided expert systems, and remote-controlled machines for maintenance work. The maintenance administration systems provide efficient work plans and data acquisition capabilities for the management of personnel and equipments involved in nuclear power plant maintenance. The plant diagnostic facilities monitor and diagnose plant conditions for preventive maintenance, as well as enabling rapid countermeasures to be carried out should they be required. Expert systems utilizing artificial intelligence (AI) technology are also employed. The newly developed remote-controlled machines are useful tools for the maintenance inspection of equipment which can not be easily accessed. (author)

  4. The importance of masticatory functional analysis in the diagnostic finding and treatment planning for prosthodontic rehabilitation

    Directory of Open Access Journals (Sweden)

    Harry Laksono

    2012-06-01

    Full Text Available Background: The masticatory system as a biologic system is subjected to harmful influences of varying severity. Almost half of routine patients requesting prosthodontic treatment indicated at least one sign or symptom of temporomandibular disorders. Analysis of the masticatory system often neglected by dentist. Untreated temporomandibular disorders may significantly implicated in the perpetuation of the disorder and may interfere with routine prosthodontic clinical procedures. It would be resulted unsuccessful long term goal of prosthodontic rehabilitation because of the uncompleted diagnoses and treatment plan. Purpose: The purpose of this case report was to give the information of the importance of masticatory functional analysis in the diagnostic finding for treatment planning in the prosthodontic rehabilitation. Case: A 45 year - old male patient, partial dentate with reduced chewing efficiency, mild pain in right preauricular region in function, left click in opening mouth, severe attrition on all anterior lower teeth with vertical dimension of occlusion decreased due to loss of posterior support. He wanted to make a new denture. Case management: Record and analyze of active and passive mandibular movement, opening pathway, muscle and temporomandibular joints palpation, load testing, and vertical dimension of occlusion with manual functional analysis (MFA, occlusal condition and radiographic examination. Treatment plan was formulated into 3 phases: stabilization of the masticatory system, definitive treatment and periodical control. The result of this treatment excellent for 1 year evaluation after permanent cementation. Conclusion: Masticatory functional analysis is very important and must be done in the diagnosis finding for treatment planning in every case of prosthodontic rehabilitation.Latar belakang: Sistem pengunyahan sebagai sistem biologis sewaktu-waktu dapat terjadi gangguan dengan berbagai derajat keparahan. Hampir setengah dari

  5. Current state of the effectiveness of problem-based learning in prosthodontics: a systematic review.

    Science.gov (United States)

    Eslami, Ehsan; Bassir, Seyed Hossein; Sadr-Eshkevari, Pooyan

    2014-05-01

    The aim of this study was to systematically review the available literature on the effectiveness of problem-based learning (PBL) in prosthodontics. Both electronic and manual searches were performed by two reviewers. Of the 440 studies identified, ten met the inclusion criteria (Kappa=0.83). Various assessment tools such as standardized examinations (National Board Dental Examination and North East Regional Board of Dental Examiners exam) (22 percent), tutor evaluation (practical and examinations performance) (20 percent), curriculum time (20 percent) and number of units (10 percent), peer evaluation (10 percent), and self-evaluation (100 percent) were used in the included studies. Thirty percent of the studies adopted a control group for all measurements, 30 percent did for only some measurements, and the others lacked any control group. Although 30 percent of the studies implemented a hybrid PBL, the other studies did not mention the type of PBL. Based on the Effective Public Health Practice Project (EPHPP), all of the included studies were rated as being of weak quality. Heterogeneity across these studies in outcome variables, study designs, levels of PBL intervention, and study population limits any attempt to generalize the outcomes. The generally poor quality assessment outcomes warrant further studies on the effectiveness of PBL in prosthodontics education compared to a non-PBL curriculum.

  6. Prosthodontic rehabilitation of completely edentulous patient with partial glossectomy

    Directory of Open Access Journals (Sweden)

    Aditi Garg

    2016-01-01

    Full Text Available Oral cancer accounts for about 40% of all cancers inflicting the human beings. Those involving the tongue results in mild to severe deficiencies of phonation, deglutition, mastication, and taste depending upon the degree and extent tissues involved. Often rehabilitation of such patient is a challenge for the prosthodontist and involves a careful observation and evaluation of the residual oral function and ways to restore them. This article presents a case report of prosthodontic rehabilitation completely edentulous patient, who underwent partial glossectomy following surgical resection of the squamous cell carcinoma involving left lateral borders of the tongue. An attempt was made to restore the comfort and function of the patient with the help of palatal augmentation prosthesis, with additional assistance through speech therapy and simple oral exercises.

  7. Clinical interpretation of a masticatory normative indicator analysis of masticatory function in subjects with different occlusal and prosthodontic status

    NARCIS (Netherlands)

    Witter, D.J.; Woda, A.; Bronkhorst, E.M.; Creugers, N.H.J.

    2013-01-01

    OBJECTIVES: To analyse the masticatory function of subjects characterised by different occlusal and prosthodontic status. Using Optosil((R)) as a test food, the masticatory normative indicator (MNIOPT) was used to differentiate between sufficient ('normal') and impaired masticatory function.

  8. Initiating statistical maintenance optimization

    International Nuclear Information System (INIS)

    Doyle, E. Kevin; Tuomi, Vesa; Rowley, Ian

    2007-01-01

    Since the 1980 s maintenance optimization has been centered around various formulations of Reliability Centered Maintenance (RCM). Several such optimization techniques have been implemented at the Bruce Nuclear Station. Further cost refinement of the Station preventive maintenance strategy includes evaluation of statistical optimization techniques. A review of successful pilot efforts in this direction is provided as well as initial work with graphical analysis. The present situation reguarding data sourcing, the principle impediment to use of stochastic methods in previous years, is discussed. The use of Crowe/AMSAA (Army Materials Systems Analysis Activity) plots is demonstrated from the point of view of justifying expenditures in optimization efforts. (author)

  9. Lifting devices with minimum effort for testing, maintenance and repair at the example of a lifting rig for core internals

    Energy Technology Data Exchange (ETDEWEB)

    Pache, Martin [Westinghouse Electric Germany GmbH (Germany); Wiesendanger, Robert [Kernkraftwerk Beznau, NOK (Switzerland)

    2008-07-01

    Beznau is a Westinghouse built nuclear power plant in the Aargau area Switzerland. It consists of two PWR units, each providing 365 MWe net capacity. The units were set into operation in 1969 and 1972, respectively, and hold an unlimited license for operation, provided they continue to fulfill current legal and security requirements. Beznau's previous lifting rigs for core internals required a high effort in testing and maintenance. Moreover, a damage to one of the rigs nearly resulted in the inoperability of the rig. However, no element of the load chain was affected, so there was no danger of a crash, but it could have caused an extended outage. Hence, it was decided to replace the lifting rigs with a state-of-the-art functional design that reflects modern requirements on maintenance and testing. Although the plant was built to ASME standards and codes, the new lifting rigs have been designed to German KTA code for lifting devices (KTA 3902 / 3903 for equipment with increased requirements, as per section 4.3 of KTA 3902). Given KTA's demands on periodic testing, one main requirement on the new design was to minimize the testing effort for the new rigs. (orig.)

  10. [Application of target restoration space quantity and quantitative relation in precise esthetic prosthodontics].

    Science.gov (United States)

    Haiyang, Yu; Tian, Luo

    2016-06-01

    Target restoration space (TRS) is the most precise space required for designing optimal prosthesis. TRS consists of an internal or external tooth space to confirm the esthetics and function of the final restoration. Therefore, assisted with quantitive analysis transfer, TRS quantitative analysis is a significant improvement for minimum tooth preparation. This article presents TRS quantity-related measurement, analysis, transfer, and internal relevance of three TR. classifications. Results reveal the close bond between precision and minimally invasive treatment. This study can be used to improve the comprehension and execution of precise esthetic prosthodontics.

  11. Prosthodontic Rehabilitation in Sjogren’s Syndrome with a Simplified Palatal Reservoir: Two Year Follow Up

    OpenAIRE

    Agrawal, Kaushal Kishor; Singh, Saumyendra V.; Rashmikant, Upadhyay Snehal; Singh, Raghuwar Dayal; Chand, Pooran

    2010-01-01

    Sjogren’s syndrome is a distinct clinical condition which includes xerostomia, ocular dryness, rheumatoid arthritis and other connective tissue disorders. Major oral problems reported by such patients include high caries rate, burning of oral mucosa, early tooth loss, increased tooth wear, poor tolerance for dentures and repeated failure of dental restorations. Prosthodontic therapy for this unique patient group is challenging and neglected due to the limited number of abutments, loss of vert...

  12. Relationship Maintenance on Facebook: Development of a Measure, Relationship to General Maintenance, and Relationship Satisfaction

    Science.gov (United States)

    Dainton, Marianne

    2013-01-01

    Previous research indicates that the primary reason college students use Facebook is for relationship maintenance. The present study sought to determine the relationship between Facebook maintenance and general maintenance efforts in college student romantic relationships, as well as the impacts of such behaviors on the relationship. Survey data…

  13. Anterior point of reference: Current knowledge and perspectives in prosthodontics

    Directory of Open Access Journals (Sweden)

    Prince Kumar

    2012-01-01

    Full Text Available The opening and closing mandibular axis is not a purely theoretical postulation, but an absolutely demonstrable biomechanical entity. It is very crucial to accurately record and transfer to articulators for the purpose of maxillofacial rehabilitation. Following the Face bow record and transfer of the mandibular axis to an anatomic articulator, we can then mount the casts so that they open and close on the articulator in the same fashion as the patient′s jaws. For this reason one of the fixed factors presented by the patient is taken into the consideration, which if properly considered, can be of inestimable value in all phases of dental treatment. This paper has sought to review the current concepts and practical implications regarding anterior point of reference in prosthodontics.

  14. The complete digital workflow in fixed prosthodontics: a systematic review.

    Science.gov (United States)

    Joda, Tim; Zarone, Fernando; Ferrari, Marco

    2017-09-19

    The continuous development in dental processing ensures new opportunities in the field of fixed prosthodontics in a complete virtual environment without any physical model situations. The aim was to compare fully digitalized workflows to conventional and/or mixed analog-digital workflows for the treatment with tooth-borne or implant-supported fixed reconstructions. A PICO strategy was executed using an electronic (MEDLINE, EMBASE, Google Scholar) plus manual search up to 2016-09-16 focusing on RCTs investigating complete digital workflows in fixed prosthodontics with regard to economics or esthetics or patient-centered outcomes with or without follow-up or survival/success rate analysis as well as complication assessment of at least 1 year under function. The search strategy was assembled from MeSH-Terms and unspecific free-text words: {(("Dental Prosthesis" [MeSH]) OR ("Crowns" [MeSH]) OR ("Dental Prosthesis, Implant-Supported" [MeSH])) OR ((crown) OR (fixed dental prosthesis) OR (fixed reconstruction) OR (dental bridge) OR (implant crown) OR (implant prosthesis) OR (implant restoration) OR (implant reconstruction))} AND {("Computer-Aided Design" [MeSH]) OR ((digital workflow) OR (digital technology) OR (computerized dentistry) OR (intraoral scan) OR (digital impression) OR (scanbody) OR (virtual design) OR (digital design) OR (cad/cam) OR (rapid prototyping) OR (monolithic) OR (full-contour))} AND {("Dental Technology" [MeSH) OR ((conventional workflow) OR (lost-wax-technique) OR (porcelain-fused-to-metal) OR (PFM) OR (implant impression) OR (hand-layering) OR (veneering) OR (framework))} AND {(("Study, Feasibility" [MeSH]) OR ("Survival" [MeSH]) OR ("Success" [MeSH]) OR ("Economics" [MeSH]) OR ("Costs, Cost Analysis" [MeSH]) OR ("Esthetics, Dental" [MeSH]) OR ("Patient Satisfaction" [MeSH])) OR ((feasibility) OR (efficiency) OR (patient-centered outcome))}. Assessment of risk of bias in selected studies was done at a 'trial level' including random sequence

  15. Understanding and Predicting the Process of Software Maintenance Releases

    Science.gov (United States)

    Basili, Victor; Briand, Lionel; Condon, Steven; Kim, Yong-Mi; Melo, Walcelio L.; Valett, Jon D.

    1996-01-01

    One of the major concerns of any maintenance organization is to understand and estimate the cost of maintenance releases of software systems. Planning the next release so as to maximize the increase in functionality and the improvement in quality are vital to successful maintenance management. The objective of this paper is to present the results of a case study in which an incremental approach was used to better understand the effort distribution of releases and build a predictive effort model for software maintenance releases. This study was conducted in the Flight Dynamics Division (FDD) of NASA Goddard Space Flight Center(GSFC). This paper presents three main results: 1) a predictive effort model developed for the FDD's software maintenance release process; 2) measurement-based lessons learned about the maintenance process in the FDD; and 3) a set of lessons learned about the establishment of a measurement-based software maintenance improvement program. In addition, this study provides insights and guidelines for obtaining similar results in other maintenance organizations.

  16. PATIENTS’ LIFE QUALITY DYNAMICS UPON OPTIMIZING THE IMPLANT PROSTHODONTICS AND THEIR ATTITUDE TO THE RESULTS OF DENTAL ORTHOPAEDIC TREATMENT (SOCIOLOGIC ANALYSIS

    Directory of Open Access Journals (Sweden)

    V. N. Trezubov

    2017-01-01

    Full Text Available The life quality estimation of dental patients, especially with total adentia, before and after implant treatment is highly topical. A direct or immediate implant prosthodontics contributes to prompt restoration of impaired aesthetic and functional standards while urgently converting patients from a disability level to a high life quality category. However, mistakes and complications occurring in this treatment stage often result in patients’ discomfort and worsen their physical and psycho-emotional state. All these are not conductive to securely provided favourable results of dental implant prosthetics, and thus require further improvement of the clinical and conceptual approaches aimed at further optimization of the above specialized medical care. The authors succeeded in improving efficacy of immediate implant prosthodontics with extended orthopaedic constructions by means of optimizing the diagnostic and therapeutic resources, as well as the hygiene protocol.

  17. Maintenance Mentor

    National Research Council Canada - National Science Library

    Jacobs, John

    2003-01-01

    Maintenance Mentor (MXM) is a research effort conducted by a joint AFRL/HESR and Northrop Grumman Information Technology team to identify the basic, high-level requirements necessary for improving flight line diagnostic capabilities...

  18. Subjective Assessment of Croatian Dental Medicine Students on Their Knowledge and Skills in Prosthodontics

    Directory of Open Access Journals (Sweden)

    Vlaho Brailo

    2017-01-01

    Full Text Available Objectives: The aim of the study was to establish the subjective perception of dental medicine students’ knowledge and skills in prosthodontics and to determine both how their perception changed during their study, by gaining clinical experience. Also, the aim was to investigate if there were any socio-demographic factors that influenced students’ perception. Methods: The research, based on an anonymous survey for dental medicine students was carried out at the School of Dental Medicine, University of Zagreb in 2015. YES/NO/DO NOT KNOW questions were used for assessment of students’ knowledge, and a 50 mm visual analog scale was used for assessment of their abilities and skills. The Chi-square test, t-test for independent samples, analysis of variance and the Pearson’s correlation coefficient were used for statistical data analysis. Results: Students’ response (4th, 5th and 6th year of study to the study amounted to 71,3 %. The results showed that clinical experience and the number of correct answers from knowledge assessment increased with the year of study. Students with completed dental laboratory technician school took statistically significantly larger number of impressions and fabricated a significantly larger number of fixed restorations. Additionally, the results showed a significantly higher level of agreement with the statements about their perception of knowledge and skills. Conclusion: Students’ perceptions on learning positively correlated with the number of completed semesters in prosthodontics and the students’ own clinical experience.

  19. Plant Maintenance. The Licensee's Viewpoint

    Energy Technology Data Exchange (ETDEWEB)

    Ungi, T. [Heysham 2 Power Station, Nuclear Electric LTD (United Kingdom)

    1997-07-01

    Plant maintenance is a very complex process which requires considerable effort from both within the maintenance process and also many support activities. It is important that the plant maintenance policy is translated into a maintenance programme which will define all relevant aspects of the maintenance. An aspect of this maintenance programme will be a maintenance catalogue which will define the maintenance activities to be carried out and at what frequencies. This paper is aimed at discussing the maintenance philosophy and resulting maintenance catalogues currently adopted in Nuclear Electric Ltd, and in particular at Heysham 2 Power Station. It goes on to consider whether these maintenance catalogues contain the optimum maintenance and if not should they be changed. If change is required, the process by which this change will be brought about is also discussed. (author)

  20. Prosthodontic management of hypohidrotic ectodermal dysplasia: a case report

    Directory of Open Access Journals (Sweden)

    Emilija Bajraktarova Valjakova

    2015-09-01

    Full Text Available Introduction: Ectodermal dysplasia (ED is a hereditary disorder associated with developmental disorders of two or more structures of ectodermal embryonic origin. Hypodontia or anodontia of the primary and permanent dentition, poorly developed alveolar ridges and improper maxillo – mandibular relations, are the most common oral manifestations. Management of patients with ectodermal dysplasia requires a multidisciplinary team approach. Case presentation: A 6.5 year-old boy with hypohidrotic ectodermal dysplasia (HED presented in this article, had typical features of HED: hypohidrosis, hypotrichosis, severe hypodontia, atrophic alveolar ridges, old-looking facial expression. According to the patient’s age and clinical findings, removable complete over-denture prosthesis in both arches was the treatment of choice. Conclusion: In patients with ED, it is important to establish correct maxillo – mandibular relations and normal function of the dento-facial system (chewing, swallowing, and speaking. Prosthodontic treatment has a major impact on aesthetics and functions,facilitates psychological development and improves emotional condition and social life of the patient.

  1. Comprehensive approach to functional palatomaxillary reconstruction using regional and free tissue transfer: Report of reconstructive and prosthodontic outcomes of 140 patients.

    Science.gov (United States)

    Urken, Mark L; Roche, Ansley M; Kiplagat, Kimberly J; Dewey, Eliza H; Lazarus, Cathy; Likhterov, Ilya; Buchbinder, Daniel; Okay, Devin J

    2018-03-14

    Palatomaxillary defects were historically restored with a prosthetic obturator; however, advances in local and free tissue transfer has provided a viable alternative for appropriately selected patients with palatomaxillary defects. A retrospective chart review of patients who underwent palatomaxillary reconstruction by the lead author between 1998 and 2016 was conducted. Patients who were restored with a palatal obturator were excluded. One hundred forty patients were reconstructed with a total of 159 local, regional, and free flaps with a 96.7% success rate. Seventy-four patients (52.8%) underwent prosthodontic rehabilitation, with 183 implants placed and an 86% success rate. Palatomaxillary reconstruction applying a systematic approach, using a multitude of techniques, is a safe and effective way to restore patients without compromising the ability to maintain surveillance. Prosthodontic rehabilitation can be achieved in a high percentage of patients using dental implants, leading to optimal aesthetic and functional results. © 2018 Wiley Periodicals, Inc.

  2. Implant and prosthodontic survival rates with implant fixed complete dental prostheses in the edentulous mandible after at least 5 years: a systematic review.

    Science.gov (United States)

    Papaspyridakos, Panos; Mokti, Muizzaddin; Chen, Chun-Jung; Benic, Goran I; Gallucci, German O; Chronopoulos, Vasilios

    2014-10-01

    The treatment of mandibular edentulism with implant fixed complete dental prostheses (IFCDPs) is a routinely used treatment option. The study aims to report the implant and prosthodontic survival rates associated with IFCDPs for the edentulous mandible after an observation period of a minimum 5 years. An electronic MEDLINE/PubMED search was conducted to identify randomized controlled clinical trials and prospective studies with IFCDPs for the edentulous mandible. Clinical studies with at least 5-year follow-up were selected. Pooled data were statistically analyzed and cumulative implant- and prosthesis survival rates were calculated by meta-analysis, regression, and chi-square statistics. Implant-related and prosthesis-related factors were identified and their impact on survival rates was assessed. Seventeen prospective studies, including 501 patients and 2,827 implants, were selected for meta-analysis. The majority of the implants (88.5% of all placed implants) had been placed in the interforaminal area. Cumulative implant survival rates for rough surface ranged from 98.42% (95% confidence interval [CI]: 97.98-98.86) (5 years) to 96.86% (95% CI: 96.00-97.73) (10 years); smooth surface implant survival rates ranged from 98.93% (95% CI: 98.38-99.49) (5 years) to 97.88% (95% CI: 96.78-98.98) (10 years). The prosthodontic survival rates for 1-piece IFCDPs ranged from 98.61% (95% CI: 97.80-99.43) (5 years) to 97.25% (95% CI: 95.66-98.86) (10 years). Treatment with mandibular IFCDPs yields high implant and prosthodontic survival rates (more than 96% after 10 years). Rough surface implants exhibited cumulative survival rates similar to the smooth surface ones (p > .05) in the edentulous mandible. The number of supporting implants and the antero-posterior implant distribution had no influence (p > .05) on the implant survival rate. The prosthetic design and veneering material, the retention type, and the loading protocol (delayed, early, and immediate) had no

  3. Exploring motivations to seek and undergo prosthodontic care: a cross-sectional study in a Brazilian adult sample

    Directory of Open Access Journals (Sweden)

    Vieira AH

    2015-06-01

    Full Text Available Antonio Hélio Vieira, Donizete Castro e Silva, Túlio Eduardo Nogueira, Cláudio Rodrigues Leles Department of Prevention and Oral Rehabilitation, School of Dentistry, Federal University of Goiás, Goiânia, Goiás, Brazil Abstract: This study explored the influence of individual and social factors regarding intentions and behaviors related to prosthodontic treatment, using the theory of planned behavior (TPB. A cross-sectional study was designed with a sample of 225 individuals with some degree of tooth loss. A questionnaire was used containing factors that would have potential influence on the intentions and behaviors of individuals, as well as clinical and sociodemographic data. Descriptive statistics, internal consistency analysis, chi-square test for trend, and logistic regression were used for data analysis. The TPB components – attitude toward the behavior (ATB, subjective norm (SN, and perceived behavioral control (PBC – showed good internal consistency (alpha = 0.60–0.78. Intention and behavior were associated with TPB components and the overall scale. Similarly, positive intentions and behaviors were associated with age, upper tooth loss, anterior tooth loss, and higher social status. Multiple logistic regression showed that intention was associated with PBC (OR =1.57; P<0.016, while behavior was associated with tooth loss in both arches (OR =9.3; P<0.001, anterior tooth loss (OR =5.13; P<0.001, higher social status (OR =3.06; P<0.03, and PBC (OR =1.38; P=0.03. The presence of anterior tooth loss was the most relevant factor for prosthodontic treatment demand and utilization, while socioeconomic status and an individual’s perceived ease or difficulty in undergoing treatment played a significant, but secondary, role in behavior toward prosthodontic care. Keywords: edentulous patient, attitude to health, health services and demand, behavior

  4. Improving the TRIGA facility maintenance by predictive maintenance techniques

    International Nuclear Information System (INIS)

    Preda, M.; Sabau, C.; Barbalata, E.

    1997-01-01

    This work deals with the specific operation of equipment in radioactive environment or in conditions allowing radioactive contamination. The requirements of remote operation ensuring the operators' protection are presented. Also, the requirements of international standards issued by IAEA-Vienna are reviewed. The organizational withdraws of the maintenance activities, based on the standards and maintenance and repair directives still in force, are shown. It is emphasized the fact that this type of maintenance was adequate to a given level of technical development, characteristic for pre-computerized industry, but, at present, it is obsolete and uneconomic both in utilization and maintenance. Such a system constitutes already a burden hindering the efforts of maximizing the availability, maintenance, prolongation the service life of equipment and utilities, finally, of increasing the efficiency of complex installations. Moreover, the predictive maintenance techniques are strongly requested by the character of radioactive installations precluding the direct access in given zones (a potential risk of irradiation or radioactive contamination) of installations during operation. The results obtained by applying the predictive maintenance techniques in the operation of the double circuit irradiation loop, used in the TRIGA reactors, are presented

  5. Reliability centered maintenance streamlining through lessons learned

    International Nuclear Information System (INIS)

    Strong, D.K.

    1991-01-01

    In late 1986, PSE and G concluded that the Nuclear Department would develop a consistent approach to maintenance at Artificial Island (Salem and Hope Creak nuclear units). Preventive maintenance (PM) would be the heart of this approach. In the last six months of 1987 departments affected by the maintenance program participated on working groups that developed the Artificial Island maintenance philosophy. The central theme of the maintenance philosophy is the RCM (reliability centered maintenance) process. A pilot project tested the process in 1988. In 1989 the Central PM Group formed and in 1990 was given responsibility and authority to analyze, approve, implement, and control PM program changes. RCM is the central theme of the PM improvement effort but not the whole effort. Other important pieces included in this paper are: development of a common PM program, improvement of work instructions, development of predictive maintenance techniques into programs, development of a PM basis database, development of PM feedback from failure trends, root cause analysis, maintenance performance indicators, technicians, and engineers

  6. Managed maintenance, the next step in power plant maintenance

    International Nuclear Information System (INIS)

    Butterworth, G.; Anderson, T.M.

    1984-01-01

    The Westinghouse Nuclear Services Integration Division managed maintenance services are described. Essential to the management and control of a total plant maintenance programme is the development of a comprehensive maintenance specification. During recent years Westinghouse has jointly developed total plant engineering-based maintenance specifications with a number of utilities. The process employed and the experience to date are described. To efficiently implement the maintenance programme Westinghouse has developed a computer software program specifically designed for day to day use at the power plant by maintenance personnel. This program retains an equipment maintenance history, schedules maintenance activities, issues work orders and performs a number of sophisticated analyses of the maintenance backlog and forecast, equipment failure rates, etc. The functions of this software program are described and details of Westinghouse efforts to support the utilities in reducing outage times through development of predefined outage plans for critical report maintenance activities are given. Also described is the experience gained in the training of specialized maintenance personnel, employing competency-based training techniques and equipment mock-ups, and the benefits experienced, in terms of improved quality and productivity of maintenance performed. The success experienced with these methods has caused Westinghouse to expand the use of these training techniques to the more routine skill areas of power plant maintenance. A significant reduction in the operating costs of nuclear power plants will only be brought about by a significant improvement in the quality of maintenance. Westinghouse intends to effect this change by expanding its international service capabilities and to make major investments in order to promote technological developments in the area of power plant maintenance. (author)

  7. Maintenance improvement program

    International Nuclear Information System (INIS)

    Derbonne, D.R.; Plunkett, T.F.; Simpson, J.R.

    1989-01-01

    During fuel cycle 1 at River Bend station, considerable effort was expended to reduce corrective maintenance work orders (MWOs) to <1,000. This was done by complementing the plant staff with costly contract personnel. Coming out of the first refueling outage, most contract personnel were released. The change in MWO backlog started a steady rise. It became readily apparent that to avoid costly contract staff time, a maintenance improvement program (MIP) was necessary. The MIP Was primarily directed at two areas: crew efficiency improvements and improved preplanned MWO packages. The overall effect of the MIP was to achieve significant productivity improvements with reduced operation and maintenance cost by providing frequent accountability to all levels of maintenance supervision. The MIP also produced a feeling of pride among the maintenance department employees that had not really existed before. This was the best benefit of all

  8. Impact of digital prosthodontic planning on dental esthetics: Biometric analysis of esthetic parameters.

    Science.gov (United States)

    Abduo, Jaafar; Bennamoun, Mohammed; Tennant, Marc; McGeachie, John

    2016-01-01

    Improving dental esthetics is a main objective of prosthodontic treatment. Recently, digital diagnostic waxing has been proposed as an alternative to conventional diagnostic waxing; however, the impact on esthetics has not been evaluated. The purpose of this study was to evaluate the impact of diagnostic waxing on biometric esthetic variables and to compare the esthetic outcome achieved by digital waxing with conventional waxing. Three biometric variables were evaluated: perceived frontal proportion (PFP), width/height (W:H) ratio, and symmetry. Maxillary casts of 13 patients were collected. All of them had maxillary anterior teeth that required prosthodontic treatment. Two forms of diagnostic waxing were executed: conventional and digital waxing. Measurements of the esthetic variables were conducted digitally. For the PFP, a frontal image was made and the width of each tooth was measured. Subsequently, the PFP values of the lateral incisor to central incisor and of the canine to central incisor were calculated. In addition, the height and width of each tooth was measured to calculate the W:H ratio. Using the previous measurements, the symmetry between the right and left sides was determined. No consistent or recurrent PFP was detected for any cast. The diagnostic waxing did not alter the PFP of the pretreatment casts. The diagnostic waxing had restored the W:H ratio to what is assumed to be a natural ratio. An improvement in symmetry was detected after the diagnostic waxing and was more prominent after the digital waxing. However, no significant difference was found between the 2 diagnostic waxing methods. The 2 diagnostic waxing methods influenced the esthetic variables of the anterior maxillary teeth and yielded similar outcomes. Digital waxing appears to be a reasonable alternative, but further investigations are needed to ensure its practicality. Copyright © 2016 Editorial Council for the Journal of Prosthetic Dentistry. Published by Elsevier Inc. All rights

  9. Personality factors versus expectations and self-reported symptoms among patients awaiting advanced prosthodontic treatment.

    Science.gov (United States)

    Hakestam, U; Söderfeldt, B; Rydén, O; Glantz, P O

    1997-09-01

    To assess simple questions for identifying patient personality traits among a normal Swedish population and to assess possible relationships between personality and symptoms, attitudes, dental problems, and received dental care, a questionnaire was sent to 489 subjects awaiting prosthodontic treatment (response rate 84.2%). Three personality traits could be identified: "Fearful-depressed" subjects consumed more tranquillisers, were worried and had many symptoms, whilst "Open-minded" were optimistic about treatment, had high expectations and few symptoms. "Control-minded" did not reveal worries and guarded their autonomy. It was concluded that personality indicators were related to clinically relevant factors: salience of teeth, perceptions of problems, dental attendance pattern, expectations and perceptions of symptoms.

  10. A 5- to 8-year retrospective study comparing the clinical results of implant-supported telescopic crown versus bar overdentures in patients with edentulous maxillae.

    Science.gov (United States)

    Zou, Duohong; Wu, Yiqun; Huang, Wei; Zhang, Zhiyong; Zhang, Zhiyuan

    2013-01-01

    The objective of this study was to compare implant survival and success rates, peri-implant parameters, and prosthodontic maintenance efforts for implant-supported telescopic crown overdentures and bar overdentures to restore maxillary edentulism. This retrospective clinical study involved patients with maxillary edentulism who were fitted with implant-supported overdentures from January 2004 to June 2007. During a 5- to 8-year follow-up period, the implant survival and success rates, biologic and mechanical complications, prosthodontic maintenance, and patient satisfaction were retrospectively analyzed. The data were evaluated statistically and P overdentures. Twenty-one patients chose telescopic crown overdentures and 23 patients chose bar overdentures. A total of 41 patients and 201 implants were available for follow-up. The implant survival and success rates, average bone resorption, and subjective patient satisfaction scores showed no difference between the telescopic crown and the bar overdenture group at follow-up. However, there were higher values for Plaque and Calculus Indexes in the bar group compared with the telescopic crown group, and these values showed a statistically significant difference annually from the 3-year follow-up (P overdentures provided a healthy peri-implant structure for implants in both groups. Implant-supported telescopic crown or bar overdentures can provide a good treatment option for patients with edentulous maxillae.

  11. Evaluation of radiotherapists' reports for treatment of prosthodontic patients after irradiation

    International Nuclear Information System (INIS)

    Matalon, V.

    1977-01-01

    A simplified explanation of gaining insight into the radiotherapist's report in order to deal with a patient who has received radiation treatment has been discussed. The best method for increasing understanding of this report is to work in conjunction with the radiotherapist before and after the patient is given radium. Five factors are important in the treatment of the irradiated patient. These are: (1) initially recognizing the radiation patient, (2) understanding the radiotherapist's report, (3) following good prosthodontic principles, (4) integrating treatment with the radiotherapist's report to prevent future problems, and (5) maintaining extremely close follow-up to detect any sore spots that could lead to major complications such as bone or soft-tissue necrosis. A poor candidate for dentures is normally a difficult candidate following radiation. Not all patients are capable of tolerating a prosthesis following radiation therapy. However, for many, function and esthetics can be restored

  12. Maintenance optimization after RCM

    International Nuclear Information System (INIS)

    Doyle, E.K.; Lee, C.-G.; Cho, D.

    2005-01-01

    Variant forms of RCM (Reliability Centered Maintenance) have been the maintenance optimizing tools of choice in industry for the last 20 years. Several such optimization techniques have been implemented at the Bruce Nuclear Station. Further cost refinement of the Station preventive maintenance strategy whereby decisions are based on statistical analysis of historical failure data are now being evaluated. The evaluation includes a requirement to demonstrate that earlier optimization projects have long term positive impacts. This proved to be a significant challenge. Eventually a methodology was developed using Crowe/AMSAA (Army Materials Systems Analysis Activity) plots to justify expenditures on further optimization efforts. (authors)

  13. Plant Maintenance. The Licensee's Viewpoint

    International Nuclear Information System (INIS)

    Ungi, T.

    1997-01-01

    Plant maintenance is a very complex process which requires considerable effort from both within the maintenance process and also many support activities. It is important that the plant maintenance policy is translated into a maintenance programme which will define all relevant aspects of the maintenance. An aspect of this maintenance programme will be a maintenance catalogue which will define the maintenance activities to be carried out and at what frequencies. This paper is aimed at discussing the maintenance philosophy and resulting maintenance catalogues currently adopted in Nuclear Electric Ltd, and in particular at Heysham 2 Power Station. It goes on to consider whether these maintenance catalogues contain the optimum maintenance and if not should they be changed. If change is required, the process by which this change will be brought about is also discussed. (author)

  14. Clinical Evaluation of Periodontal Tissue Status in Prosthodontic Treatment of Patients with Partial Tooth Loss and Generalized Periodontitis

    Directory of Open Access Journals (Sweden)

    A. Kushlyk

    2018-01-01

    Full Text Available The problem of selection and application of dental prostheses in periodontal disease is especially relevant in case of severe generalized periodontitis, which is accompanied by mobile tooth removal resulting in overloading the periodontium of the remaining teeth as well as the increase in tooth mobility. Therefore, in generalized periodontitis, it is important to apply the method of direct dental prosthetic rehabilitation since, in case of partial tooth loss, it will prevent the development of generalized periodontitis complications. The objective of the research was to improve the effectiveness of combination therapy for patients with generalized periodontitis and partial tooth loss applying the developed method of direct fixed dental prosthetic rehabilitation based on the study of the periodontal status. Materials and methods. The study included 129 patients with general periodontitis, II-III degree and partial tooth loss over the age of 45 years. According to prosthodontic treatment, all the patients were divided into three groups: Group I consisted of 42 (20 women and 22 men patients who immediately after tooth extraction were rehabilitated with the application of direct plastic laminar immediate prosthesis and selective tooth grinding; permanent dental prosthetic rehabilitation was performed 6 weeks after tooth extraction; Group II included 43 (21 women and 22 men patients who underwent traditional permanent dental prosthetic rehabilitation using fixed dental bridges 6 weeks after mobile tooth removal and wound healing; Group III comprised 44 (21 women and 23 men patients who immediately after mobile tooth removal were rehabilitated with the application of direct fixed sectional dental bridge (Ukrainian patent UA 20995. 2007 Feb 15 and selective tooth grinding; permanent dental prosthetic rehabilitation was performed 6 months after tooth extraction. The control group consisted of 26 people with intact dentitions over the age of 45 years

  15. A Critical Review of Search Strategies Used in Recent Systematic Reviews Published in Selected Prosthodontic and Implant-Related Journals: Are Systematic Reviews Actually Systematic?

    Science.gov (United States)

    Layton, Danielle

    The aim of this study was to outline how search strategies can be systematic, to examine how the searches in recent systematic reviews in prosthodontic and implant-related journals were structured, and to determine whether the search strategies used in those articles were systematic. A total of 103 articles published as systematic reviews and indexed in Medline between January 2013 and May 2016 were identified from eight prosthodontic and implant journals and reviewed. The search strategies were considered systematic when they met the following criteria: (1) more than one electronic database was searched, (2) more than one searcher was clearly involved, (3) both text words and indexing terms were clearly included in the search strategy, (4) a hand search of selected journals or reference lists was undertaken, (5) gray research was specifically sought, and (6) the articles were published in English and at least one other language. The data were tallied and qualitatively assessed. The majority of articles reported on implants (54%), followed by tooth-supported fixed prosthodontics (13%). A total of 23 different electronic resources were consulted, including Medline (by 100% of articles), the Cochrane Library (52%), and Embase (37%). The majority consulted more than one electronic resource (71%), clearly included more than one searcher (73%), and employed a hand search of either selected journals or reference lists (86%). Less than half used both text words and indexing terms to identify articles (42%), while 15% actively sought gray research. Articles published in languages other than English were considered in 63 reviews, but only 14 had no language restrictions. Of the 103 articles, 5 completed search strategies that met all 6 criteria, and a further 12 met 5 criteria. Two articles did not fulfill any of the criteria. More than 95% of recent prosthodontic and implant review articles published in the selected journals failed to use search strategies that were

  16. Relationship between prosthodontic status and nutritional intake in the elderly in Korea: National Health and Nutrition Examination Survey (NHANES IV).

    Science.gov (United States)

    Choi, Y K; Park, D Y; Kim, Y

    2014-11-01

    Many health issues have been reported to be associated with poor nutritional status. We sought to examine the association between nutritional intake and oral health status in elderly people. The association between perceived disability in mastication and prosthodontic status was analysed using multiple logistic regression. Multiple linear regression was used to analyse the association between prosthodontic status and nutritional intake. The elderly subjects with partial or full dentures reported chewing difficulties 1.62-fold more frequently (95% CI: 1.06-2.49) than those with natural teeth or a fixed prosthesis after adjusting for gender, TMD (temporomandibular disorder), household income and education level. Additionally, daily nutritional intakes of energy, protein, fat, ash, calcium, phosphorus and thiamine were decreased significantly in elderly with partial or full dentures compared with those with no prosthesis or with a fixed prosthesis (P oral health status and perceived disability in mastication are associated with dietary imbalances in the elderly. We suggest that the evaluation of patients' nutritional status should be considered as a part of an overall plan for dental hygiene care. © 2013 John Wiley & Sons A/S. Published by John Wiley & Sons Ltd.

  17. Effort Estimation in BPMS Migration

    OpenAIRE

    Drews, Christopher; Lantow, Birger

    2018-01-01

    Usually Business Process Management Systems (BPMS) are highly integrated in the IT of organizations and are at the core of their business. Thus, migrating from one BPMS solution to another is not a common task. However, there are forces that are pushing organizations to perform this step, e.g. maintenance costs of legacy BPMS or the need for additional functionality. Before the actual migration, the risk and the effort must be evaluated. This work provides a framework for effort estimation re...

  18. Maintenance-Ready Web Application Development

    Directory of Open Access Journals (Sweden)

    Ion IVAN

    2016-01-01

    Full Text Available The current paper tackles the subject of developing maintenance-ready web applications. Maintenance is presented as a core stage in a web application’s lifecycle. The concept of maintenance-ready is defined in the context of web application development. Web application maintenance tasks types are enunciated and suitable task types are identified for further analysis. The research hypothesis is formulated based on a direct link between tackling maintenance in the development stage and reducing overall maintenance costs. A live maintenance-ready web application is presented and maintenance related aspects are highlighted. The web application’s features, that render it maintenance-ready, are emphasize. The cost of designing and building the web-application to be maintenance-ready are disclosed. The savings in maintenance development effort facilitated by maintenance ready features are also disclosed. Maintenance data is collected from 40 projects implemented by a web development company. Homogeneity and diversity of collected data is evaluated. A data sample is presented and the size and comprehensive nature of the entire dataset is depicted. Research hypothesis are validated and conclusions are formulated on the topic of developing maintenance-ready web applications. The limits of the research process which represented the basis for the current paper are enunciated. Future research topics are submitted for debate.

  19. Nuclear power plant maintenance personnel reliability prediction (NPP/MPRP) effort at Oak Ridge National Laboratory

    International Nuclear Information System (INIS)

    Knee, H.E.; Haas, P.M.; Siegel, A.I.

    1981-01-01

    Human errors committed during maintenance activities are potentially a major contribution to the overall risk associated with the operation of a nuclear power plant (NPP). An NRC-sponsored program at Oak Ridge National Laboratory is attempting to develop a quantitative predictive technique to evaluate the contribution of maintenance errors to the overall NPP risk. The current work includes a survey of the requirements of potential users to ascertain the need for and content of the proposed quantitative model, plus an initial job/task analysis to determine the scope and applicability of various maintenance tasks. In addition, existing human reliability prediction models are being reviewed and assessed with respect to their applicability to NPP maintenance tasks. This paper discusses the status of the program and summarizes the results to date

  20. Development of blanket remote maintenance system

    International Nuclear Information System (INIS)

    Kakudate, Satoshi; Nakahira, Masataka; Oka, Kiyoshi; Taguchi, Kou

    1998-01-01

    ITER in-vessel components such as blankets are scheduled maintenance components, including complete shield blanket replacement for breeding blankets. In-vessel components are activated by 14 MeV neutrons, so blanket maintenance requires remote handling equipment and tools able to handle heavy payloads of about 4 tons within a positioning accuracy of 2 mm under intense gamma radiation. To facilitate remote maintenance, blankets are segmented into 730 modules and rail-mounted vehicle remote maintenance was developed. According to the ITER R and D program, critical technology related to blanket maintenance was developed extensively through joint efforts of the Japan, EU, and U.S. home teams. This paper summarizes current blanket maintenance technology conducted by the Japan Home Team, including development of full-scale remote handling equipment and tools for blanket maintenance. (author)

  1. Development of blanket remote maintenance system

    Energy Technology Data Exchange (ETDEWEB)

    Kakudate, Satoshi; Nakahira, Masataka; Oka, Kiyoshi; Taguchi, Kou [Japan Atomic Energy Research Inst., Tokai, Ibaraki (Japan). Tokai Research Establishment

    1998-04-01

    ITER in-vessel components such as blankets are scheduled maintenance components, including complete shield blanket replacement for breeding blankets. In-vessel components are activated by 14 MeV neutrons, so blanket maintenance requires remote handling equipment and tools able to handle heavy payloads of about 4 tons within a positioning accuracy of 2 mm under intense gamma radiation. To facilitate remote maintenance, blankets are segmented into 730 modules and rail-mounted vehicle remote maintenance was developed. According to the ITER R and D program, critical technology related to blanket maintenance was developed extensively through joint efforts of the Japan, EU, and U.S. home teams. This paper summarizes current blanket maintenance technology conducted by the Japan Home Team, including development of full-scale remote handling equipment and tools for blanket maintenance. (author)

  2. Oral rehabilitation of a patient with ectodermal dysplasia with prosthodontics treatment

    Directory of Open Access Journals (Sweden)

    Srinivas Nallanchakrava

    2013-01-01

    Full Text Available Ectodermal dysplasia (ED is a rare, congenital disease that involves the sweat glands, scalp hair, nails, skin pigmentation, and craniofacial structure. Oral symptoms of ED include multiple tooth abnormalities (such as hypodontia, anadontia, impacted teeth, and peg-shaped or conical anterior teeth and lack of normal alveolar ridge development. A 12-year-old male patient, in the absence of any other systemic abnormalities, exhibited typical characteristics of ED, visited our department of pedodontics and preventive dentistry at Panineeya Mahavidyalaya Institute of Dental Sciences and Research Centre. In the clinical and radiographic evaluation, it was occurred that he had only maxillary and mandibular first molars in his mouth. A maxillary and mandibular denture with clasps for retention was fabricated for prosthodontic rehabilitation after considering his growth and the number and condition of his present teeth. At the 18-month follow-up no major complications occurred and further future treatment included implants retained fixed partial dentures.

  3. Prosthodontic decision-making relating to dentitions with compromised molars: the perspective of Swedish General Dental Practitioners.

    Science.gov (United States)

    Korduner, E-K; Collin Bagewitz, I; Vult von Steyern, P; Wolf, E

    2016-12-01

    The aim of this investigation was to study the clinical prosthodontic decision-making process relating to dentitions with compromised molars among Swedish general dental practitioners (GDPs). Eleven Swedish GDPs were purposively selected, and all agreed to participate. Then, in-depth, semi-structured interviews were conducted and covered treatment considerations concerning two authentic patient cases, initially with complete dental arches, and later, a final treatment based on a shortened dental arch (SDA) was discussed. The cases involved patients with compromised teeth situated mainly in the molar regions. One patient suffered from extensive caries and the other from severe periodontal disease. Qualitative content analysis was used to analyse the data. In the systematic analysis, two main categories were identified: holistic and functional approach. Among the interviewed GDPs, focus was put on patients' needs, background history and motivation for treatment as well as the preservation of molar support. Within the limitations of this study, the following can be concluded: keeping a dental arch with molars seems to be important to Swedish general dental practitioners. The SDA concept does not seem to have a substantial impact on the prosthodontic decision-making relating to dentitions with compromised molars. The dentist's experiences, as well as colleagues' or consulting specialist advice together with aetiological factors and the patient's individual situation, influence the decision-making more than the SDA concept. The conflicting results in the prosthetic decision-making process concerning the relevance of age and the need for molar support need further investigation, for example based on decisions made in the dentist's own clinical practice. © 2016 John Wiley & Sons Ltd.

  4. Effort Estimation in BPMS Migration

    Directory of Open Access Journals (Sweden)

    Christopher Drews

    2018-04-01

    Full Text Available Usually Business Process Management Systems (BPMS are highly integrated in the IT of organizations and are at the core of their business. Thus, migrating from one BPMS solution to another is not a common task. However, there are forces that are pushing organizations to perform this step, e.g. maintenance costs of legacy BPMS or the need for additional functionality. Before the actual migration, the risk and the effort must be evaluated. This work provides a framework for effort estimation regarding the technical aspects of BPMS migration. The framework provides questions for BPMS comparison and an effort evaluation schema. The applicability of the framework is evaluated based on a simplified BPMS migration scenario.

  5. Applications of polyetheretherketone (PEEK) in oral implantology and prosthodontics.

    Science.gov (United States)

    Najeeb, Shariq; Zafar, Muhammad S; Khurshid, Zohaib; Siddiqui, Fahad

    2016-01-01

    Polyetheretherketone (PEEK) is a polymer that has many potential uses in dentistry. The aim of this review was to summarize the outcome of research conducted on the material for dental applications. In addition, future prospects of PEEK in the field of clinical dentistry have been highlighted. An electronic search was carried out via the PubMed (Medline) database using keywords 'polyetheretherketone', 'dental' and 'dentistry' in combination. Original research papers published in English language in last fifteen year were considered. The studies relevant to our review were critically analyzed and summarized. PEEK has been explored for a number of applications for clinical dentistry. For example, PEEK dental implants have exhibited lesser stress shielding compared to titanium dental implants due to closer match of mechanical properties of PEEK and bone. PEEK is a promising material for a number of removable and fixed prosthesis. Furthermore, recent studies have focused improving the bioactivity of PEEK implants at the nanoscale. Considering mechanical and physical properties similar to bone, PEEK can be used in many areas of dentistry. Improving the bioactivity of PEEK dental implants without compromising their mechanical properties is a major challenge. Further modifications and improving the material properties may increase its applications in clinical dentistry. Copyright © 2015 Japan Prosthodontic Society. Published by Elsevier Ltd. All rights reserved.

  6. Maintenance philosophy and program at Cernavoda NPP

    International Nuclear Information System (INIS)

    Bobos, M.; Enciu, G.

    1994-01-01

    Maintenance plays a key role in ensuring safe and reliable operation. An effective maintenance program should ensure that installed equipment operates when needed and the equipment malfunctions or deficiencies are corrected in time and rarely recur. Maintenance includes not only the activities traditionally associated with identifying or correcting current or potential equipment deficiencies but also extends to supporting technical functions for the conduct of these activities (for example, engineering, technical support, chemistry control, radiological protection, industrial safety and training). The maintenance management program should clearly define the relationship among these supporting groups as it is related to overall plant maintenance and promotes the concept of a successful integrated team effort. (Author)

  7. Implant-assisted removable partial dentures: practical considerations.

    Science.gov (United States)

    Omura, Aaron J; Latthe, Vaibhav; Marin, Mark M; Cagna, David R

    2016-01-01

    At the heart of prosthodontic treatment planning must be a sound understanding of the quality and reliability of the prosthodontic foundation. Implant prosthodontics relies almost entirely on the biological and mechanical properties of an osseous foundation. Initiation of therapy in the absence of a healthy and stable prosthodontic foundation risks unintended and suboptimal treatment outcomes. For conventional removable partial denture (RPD) therapy, consideration must be given to interactions between the soft and hard tissues available to support and stabilize planned prostheses. The strategic addition of implants to the partially edentulous foundation can improve the support, comfort, and esthetics of an RPD, resulting in elevated patient satisfaction and greater therapeutic success. This article discusses aspects of diagnosis, treatment planning, clinical management, laboratory execution, and maintenance that must be considered in order to obtain optimal results with implant-assisted RPDs.

  8. Advances in safety related maintenance

    International Nuclear Information System (INIS)

    2000-03-01

    The maintenance of systems, structures and components in nuclear power plants (NPPs) plays an important role in assuring their safe and reliable operation. Worldwide, NPP maintenance managers are seeking to reduce overall maintenance costs while maintaining or improving the levels of safety and reliability. Thus, the issue of NPP maintenance is one of the most challenging aspects of nuclear power generation. There is a direct relation between safety and maintenance. While maintenance alone (apart from modifications) will not make a plant safer than its original design, deficient maintenance may result in either an increased number of transients and challenges to safety systems or reduced reliability and availability of safety systems. The confidence that NPP structures, systems and components will function as designed is ultimately based on programmes which monitor both their reliability and availability to perform their intended safety function. Because of this, approaches to monitor the effectiveness of maintenance are also necessary. An effective maintenance programme ensures that there is a balance between the improvement in component reliability to be achieved and the loss of component function due to maintenance downtime. This implies that the safety level of an NPP should not be adversely affected by maintenance performed during operation. The nuclear industry widely acknowledges the importance of maintenance in NPP safety and operation and therefore devotes great efforts to develop techniques, methods and tools to aid in maintenance planning, follow-up and optimization, and in assuring the effectiveness of maintenance

  9. Excellence through maintenance mastering

    International Nuclear Information System (INIS)

    Lamarche, M.; Guillot, M.; Monier, M.

    1987-01-01

    To improve the overall availability factor of nuclear power plants you have to cut either the forced outage role and the planned outage time or you need to reduce simultaneously the failures and the efforts devoted to avoiding them. Among other results, this goal leads to a decrease in the number of real or anticipated problems. Electricite de France policy, in this matter, is to focus on decreasing the compoents' maintenance needs through a comprehensive modification program, targeted to eliminating the weak points as revealed by the operation. Thereby one may reach, for simple equipment, a nearly maintenance-free condition in which the only maintenance needed is surveillance, which provides assurance that everything is operating properly. A good example of this type of equipment is the family of static components, drums, and pipes whose corrective maintenance is almost nil when their initial condition is good

  10. Implant-Supported Telescopic Crown-Retained Overdentures for Oral Rehabilitation of Patients with Severe Bony Defects: A 5-Year Retrospective Study.

    Science.gov (United States)

    Zou, Duohong; Wang, Feng; Wu, Yiqun; Huang, Wei; Zhang, Chenping; Zhang, Zhiyuan

    2015-01-01

    To evaluate the performance of dental implant-supported telescopic crown (TC)-retained overdentures to restore the oral function of patients who have insufficient jawbone volume resulting from tumor resection or trauma. From January 2004 to December 2008, implant-supported TC-retained overdentures were used to restore the oral function of patients with severe bony defects resulting from tumor resection or trauma. Clinical data, including implant success and survival rates, biologic and mechanical complications, prosthodontic maintenance efforts, and patient satisfaction, were analyzed annually after delivery of the final prostheses. Twenty-four patients were treated, and a total of 88 implants were inserted to support TC-retained overdentures. The mean modified plaque index of implants remained low (76.3%) in the study showed the absence of bleeding on probing at follow-up visits. Peri-implant marginal bone loss (MBL) ranged from 0.8 to 1.2 mm. There was no statistically significant difference in the MBL between maxillary and mandibular implants (P = .43). The implant success rate was 100% after 5 years, and the prosthodontic maintenance and complication rate was 0.22 times per year. More than 90% of patients were satisfied with the restoration of their oral function using TCs. Based on our study of 24 patients treated with TC-retained overdentures, it appears that this treatment may be a viable option for patients with insufficient jawbone volume.

  11. The nuclear power plant maintenance personnel reliability prediction (NPP/MPRP) effort at Oak Ridge National Laboratory

    International Nuclear Information System (INIS)

    Knee, H.E.; Haas, P.M.; Siegel, A.I.

    1982-01-01

    Human errors committed during maintenance activities are potentially a major contribution to the overall risk associated with the operation of a nuclear power plant (NPP). An NRC-sponsored program at Oak Ridge National Laboratory is attempting to develop a quantitative predictive technique to evaluate the contribution of maintenance errors to the overall NPP risk. The current work includes a survey of the requirements of potential users to ascertain the need for and content of the proposed quantitative model, plus an initial job/task analysis to determine the scope and applicability of various maintenance tasks. In addition, existing human reliability prediction models are being reviewed and assessed with respect to their applicability to NPP maintenance tasks. This paper discusses the status of the program and summarizes the results to date

  12. Remote maintenance development, July 1975--July 1976

    International Nuclear Information System (INIS)

    Fletcher, R.D.

    1977-04-01

    The results of the second year's efforts on remote handling development and studies for remote maintenance of failure-prone areas of the New Waste Calcining Facility (NWCF) are presented. Test arrangements and results for specific viewing situations and component remote installation and removal in the Remote Maintenance Development Facility (RMDF) and component material evaluations are discussed

  13. Reproductive effort accelerates actuarial senescence in wild birds : An experimental study

    NARCIS (Netherlands)

    Boonekamp, Jelle J.; Salomons, Martijn; Bouwhuis, Sandra; Dijkstra, Cornelis; Verhulst, Simon

    Optimality theories of ageing predict that the balance between reproductive effort and somatic maintenance determines the rate of ageing. Laboratory studies find that increased reproductive effort shortens lifespan, but through increased short-term mortality rather than ageing. In contrast, high

  14. Electronic laboratory quality assurance program: A method of enhancing the prosthodontic curriculum and addressing accreditation standards.

    Science.gov (United States)

    Moghadam, Marjan; Jahangiri, Leila

    2015-08-01

    An electronic quality assurance (eQA) program was developed to replace a paper-based system and to address standards introduced by the Commission on Dental Accreditation (CODA) and to improve educational outcomes. This eQA program provides feedback to predoctoral dental students on prosthodontic laboratory steps at New York University College of Dentistry. The purpose of this study was to compare the eQA program of performing laboratory quality assurance with the former paper-based format. Fourth-year predoctoral dental students (n=334) who experienced both the paper-based and the electronic version of the quality assurance program were surveyed about their experiences. Additionally, data extracted from the eQA program were analyzed to identify areas of weakness in the curriculum. The study findings revealed that 73.8% of the students preferred the eQA program to the paper-based version. The average number of treatments that did not pass quality assurance standards was 119.5 per month. This indicated a 6.34% laboratory failure rate. Further analysis of these data revealed that 62.1% of the errors were related to fixed prosthodontic treatment, 27.9% to partial removable dental prostheses, and 10% to complete removable dental prostheses in the first 18 months of program implementation. The eQA program was favored by dental students who have experienced both electronic and paper-based versions of the system. Error type analysis can yield the ability to create customized faculty standardization sessions and refine the didactic and clinical teaching of the predoctoral students. This program was also able to link patient care activity with the student's laboratory activities, thus addressing the latest requirements of the CODA regarding the competence of graduates in evaluating laboratory work related to their patient care. Copyright © 2015 Editorial Council for the Journal of Prosthetic Dentistry. Published by Elsevier Inc. All rights reserved.

  15. Prosthodontic rehabilitation of oral function in head-neck cancer patients with dental implants placed simultaneously during ablative tumour surgery : an assessment of treatment outcomes and quality of life

    NARCIS (Netherlands)

    Schoen, P. J.; Raghoebar, G. M.; Bouma, J.; Reintsema, H.; Burlage, F. R.; Roodenburg, J. L. N.; Vissink, A.

    The aim of this prospective study was to assess treatment outcome and impact on quality of life of prosthodontic rehabilitation with implant-retained prostheses in head-neck cancer patients. Fifty patients were evaluated by standardized questionnaires and clinical assessment. All received the

  16. Maintenance for life management

    International Nuclear Information System (INIS)

    Hevia, F.

    1997-01-01

    Life Management is based on the detection, monitoring and control of long-term degradation that affects individual plant components and important populations. Experience has shown that in many cases current maintenance practices do not attend to ageing directly; instead they deal with the consequences when it is already too late, when good Life Management is no longer practical. This has brought about the need for specific Maintenance Evaluation and Improvement Programmes to adjust to the basic objective of Life Management which is to project against, monitor and mitigate ageing that can affect the safe and profitable operating life of the facility. New regulatory requirements for ageing monitoring and effective maintenance to ensure safety (Maintenance Rule) have made it even more necessary to implement the Maintenance Evaluation Programme to cope with ageing, and to integrate that tasks in both programmes to optimise effort and use of tools. This paper presents a brief description of the objectives and methodologies of these Programmes which has been applied to plants around the world and in Spain at the Garona and Vandellos II plants in Spain as part of the PIE project for developing a Remanent Life Evaluation System for nuclear power plants. (Author)

  17. AIR NATIONAL GUARD C-130H AIRCRAFT MAINTENANCE OFFICER MANNING: IS THERE A BETTER OPTION

    Science.gov (United States)

    2016-10-01

    the overall maintenance effort through the production superintendent would have to also begin supervising the flights at the MXAAA and MXAAB level...superintendent, line chief and production supervisor above them to coordinate the maintenance effort. In Figure 3, notional MXS organizational...seven personnel after assuming the span of control relinquished by the MXAA aircraft maintenance officer. The total span of control for the AMXS MOO

  18. Clinical interpretation of a masticatory normative indicator analysis of masticatory function in subjects with different occlusal and prosthodontic status.

    Science.gov (United States)

    Witter, Dick J; Woda, Alain; Bronkhorst, Ewald M; Creugers, Nico H J

    2013-05-01

    To analyse the masticatory function of subjects characterised by different occlusal and prosthodontic status. Using Optosil(®) as a test food, the masticatory normative indicator (MNIOPT) was used to differentiate between sufficient ('normal') and impaired masticatory function. Outcomes of occlusal force and masticatory tests were aggregated from three earlier studies dealing with four denture groups and three natural dentition groups. The four denture groups had a complete removable dental prosthesis in the upper jaw, and displayed one of the four following lower jaw prosthodontic rehabilitations: (i) complete removable dental prosthesis on a low mandible; (ii) complete removable dental prosthesis on a higher mandible; (iii) overdenture on natural roots; and (iv) overdenture on dental implants. The three natural dentition groups were: (i) shortened dental arch; (ii) complete dentition in older participants, and (iii) complete dentition in younger participants. All participants were women. They performed the same tests twice, and outcomes were averaged. A MNIOPT value of 3.68 mm was determined from the participants with complete natural dentitions. Applying the MNIOPT to the participants in the denture groups pointed at a considerable chance for impaired masticatory function, except for participants in the overdenture -implants group. The four denture groups compensated for reduced masticatory efficiency by increased number of masticatory cycles and prolonged mastication time until 'swallowing'. Nevertheless, they also 'swallowed' larger particles compared to the complete dentition group. For a given patient or for a group of subjects with specific dental conditions, MNI enables to discriminate between a sufficient ('normal') and an impaired masticatory function. Copyright © 2013 Elsevier Ltd. All rights reserved.

  19. Electric motor predictive and preventive maintenance guide

    International Nuclear Information System (INIS)

    Oliver, J.A.

    1992-07-01

    Electric motor performance is vital to the reliable and efficient operation of power plants. The failure of one or more critical motors could cause lost capacity and excessive repair and maintenance cost. However, existing maintenance recommendations proposed by vendors for electric motors have sometimes encouraged many overly conservative maintenance practices. These practices have lead to excessive maintenance activities and costs which have provided no extra margin of operability. EPRI has sponsored RP2814-35 to develop a guide which provides power plants with information and guidance for establishing an effective maintenance program which will aid in preventing unexpected motor failures and assist in planning motor maintenance efforts. The guide includes a technical description which summarizes technical data relative to the four basic types of motors and their components in general use in power plants. The significant causes of motor failures are investigated and described in detail and methods to optimize service life and minimize maintenance cost through appropriate preventive maintenance and conditioning program are presented. This guide provides a foundation for an effective electric motor maintenance program and simplifies the selection of predictive and preventive maintenance tasks. Its use will enable maintenance personnel in nuclear and fossil plants to plan motor repairs during scheduled outages and avoid costly unexpected failures

  20. TPX in-vessel remote maintenance tooling

    International Nuclear Information System (INIS)

    Rennich, M.J.; Silke, G.W.

    1995-01-01

    The Tokamak Physics Experiment (TPX) has used the lessons learned from successful remote maintenance and remote handling facilities to develop both a concept and philosophy for incorporation of remote design from the earliest phases of the project. Initiation of mockup testing during the conceptual design phase leads to significant improvements in the basic maintenance equipment configuration. In addition, remote handling features and capabilities have been incorporated into the design of the plasma-facing components (PFCs) as part of the total PFC design effort

  1. Estimating Maintenance Cost for Web Applications

    Directory of Open Access Journals (Sweden)

    Ion IVAN

    2016-01-01

    Full Text Available The current paper tackles the issue of determining a method for estimating maintenance costs for web applications. The current state of research in the field of web application maintenance is summarized and leading theories and results are highlighted. The cost of web maintenance is determined by the number of man-hours invested in maintenance tasks. Web maintenance tasks are categorized into content maintenance and technical maintenance. Research is centered on analyzing technical maintenance tasks. The research hypothesis is formulated on the assumption that the number of man-hours invested in maintenance tasks can be assessed based on the web application’s user interaction level, complexity and content update effort. Data regarding the costs of maintenance tasks is collected from 24 maintenance projects implemented by a web development company that tackles a wide area of web applications. Homogeneity and diversity of collected data is submitted for debate by presenting a sample of the data and depicting the overall size and comprehensive nature of the entire dataset. A set of metrics dedicated to estimating maintenance costs in web applications is defined based on conclusions formulated by analyzing the collected data and the theories and practices dominating the current state of research. Metrics are validated with regards to the initial research hypothesis. Research hypothesis are validated and conclusions are formulated on the topic of estimating the maintenance cost of web applications. The limits of the research process which represented the basis for the current paper are enunciated. Future research topics are submitted for debate.

  2. Maintenance of remote reconnaissance vehicle

    International Nuclear Information System (INIS)

    Schein, D.C.

    1985-01-01

    A description is provided of the maintenance program developed for remote reconnaissance vehicles, such as RRV-1, in use at the Three Mile Island Unit 2. The described approach, which is simple, effective, and flexible, helped to make the effort successful. It will be applied to future projects

  3. Prosthodontic rehabilitation of patient with marginal mandibular resection using attachment supported prostheses: A clinical report

    Directory of Open Access Journals (Sweden)

    Kailas Mundhe

    2014-01-01

    Full Text Available Marginal mandibular resection to treat neoplasms leads to loss of alveolar bone and teeth at the affected side. Consequently patient suffers with poor masticatory performance and esthetic disfigurement, which we need to restore with the help of prosthodontic rehabilitation. The success of rehabilitation of these patients depends on strategic treatment planning and choice of most suitable treatment modality. In this article, case of a patient has been presented who underwent marginal mandibular resection and reported with many limiting factors like obliterated buccal and lingual sulci, attachment of lingual frenum and lower lip at the level of alveolar ridge and Macroglossia. Impression making and fabrication of a retentive prosthesis were the main challenges. Therefore, a modified impression technique was used to fabricate mandibular cast partial denture with extracoronal semi precision attachments to enhance the retention of the prosthesis.

  4. Maintenance self-assessments - An INPO [Institute of Nuclear Power Operation] perspective

    International Nuclear Information System (INIS)

    Subalusky, W.T.

    1990-01-01

    In March 1987, all nuclear utilities in the US were requested by the Institute of Nuclear Power Operations (INPO) to perform a self-assessment of their maintenance programs. The goal of these self-assessments was to have each station identify any existing problem areas in maintenance in clear and sufficient detail to determine the root causes of the problems and to provide a foundation for subsequent corrective actions. The self-assessments were to be performed by each nuclear station using the INPO document Guidelines for the Conduct of Maintenance at Nuclear Power Stations. By December 1987, 72 of 74 stations had completed the self-assessments, and by the middle of 1988, all stations had completed this systematic review of their maintenance programs. As part of an industry plan to ensure continued improvements in maintenance, INPO is following up on the effectiveness of these self-assessments during the course of plant evaluation visits. This presentation briefly reviews the approaches to self-assessment of the station's maintenance programs, some of the lessons learned from this effort, and the results, to date, of INPO follow-up efforts in this area

  5. Prosthodontic rehabilitation of hypophosphatasia using dental implants: a review of the literature and two case reports.

    LENUS (Irish Health Repository)

    Lynch, C D

    2009-06-01

    There are reports in the literature of the various dental features of hypophosphatasia, especially where it affects the deciduous dentition. The descriptions include both the manifestations of the disorder and the subsequent patterns of tooth loss. There are fewer descriptions of the effects of hypophosphatasia on the permanent dentition and little information on the subsequent prosthodontic management of these patients, particularly in relation to the use of dental implants. The aim of this paper was to review the literature on the dental effects of hypophosphatasia, present two cases and describe how one of those patients, a young adult, was successfully rehabilitated using dental implants. That latter patient\\'s pattern of tooth loss as well as some histological and scanning electron microscopic findings of root cementum from the other case is also described.

  6. NASA work unit system file maintenance manual

    Science.gov (United States)

    1972-01-01

    The NASA Work Unit System is a management information system for research tasks (i.e., work units) performed under NASA grants and contracts. It supplies profiles on research efforts and statistics on fund distribution. The file maintenance operator can add, delete and change records at a remote terminal or can submit punched cards to the computer room for batch update. The system is designed for file maintenance by a person with little or no knowledge of data processing techniques.

  7. Implementation of maintenance rule for structures

    International Nuclear Information System (INIS)

    Ashar, H.; Bagchi, G.

    1999-01-01

    The maintenance rule, 10 CFR 50.65, 'Requirements for Monitoring the Effectiveness of Maintenance at Nuclear Power Plants', was published by the Nuclear Regulatory Commission (NRC) in the Federal Register (56 FR 31324) on July 10, 1991. The rule became effective on July 10, 1996, giving nuclear power plant licensees 5 years to implement it. During 1994-1995, NRC staff visited nine nuclear power plant sites to observe licensees' preparations for implementation of the rule. The teams found that most of the licensees had not established goals, or performance criteria for monitoring structures at their sites. The licensees contended that the structures were inherently reliable and required no monitoring under the maintenance rule. On the basis of earlier site visits performed by NRC staff to assess the condition of structures, the NRC staff could not accept this contention, and clarified its position in Revision 1 of Regulatory Guide 1.160, 'Monitoring the Effectiveness of Maintenance at Nuclear Power Plants'. This paper discusses the applicability of the maintenance rule criteria for structures and its usefulness in ensuring that the structures, systems, and components within the scope of the maintenance rule are capable of fulfilling their intended functions. Also discussed are the aspects of maintenance rule efforts that could be useful for license renewal applications. (orig.)

  8. The role of knowledge sharing and transactive memory system on condition based maintenance policy

    NARCIS (Netherlands)

    Koochaki, J.; Bouwhuis, I. M.

    2008-01-01

    Today, Condition Based Maintenance (CBM) has reached a sophisticated level in industry and the advantages of predictive maintenance are accepted globally. However, although lots of effort has been put into improving methods and techniques in CBM, most of predictive maintenance programs fail to

  9. CANDU plant maintenance: Recent developments

    International Nuclear Information System (INIS)

    Charlebois, P.

    2000-01-01

    CANDU units have long been recognized for their exceptional safety and reliability. Continuing development in the maintenance area has played a key role in achieving this performance level. For over two decades, safety system availability has been monitored closely and system maintenance programs adjusted accordingly to maintain high levels of performance. But as the plants approach mid life in a more competitive environment and component aging becomes a concern, new methods and techniques are necessary. As a result, recent developments are moving the maintenance program largely from a corrective and preventive approach to predictive and condition based maintenance. The application of these techniques is also being extended to safety related systems. These recent developments include use of reliability centred methods to define system maintenance requirements and strategies. This approach has been implemented on a number of systems at Canadian CANDU plants with positive results. The pilot projects demonstrated that the overall maintenance effort remained relatively constant while the system performance improved. It was also possible to schedule some of the redundant component maintenance during plant operation without adverse impact on system availability. The probabilistic safety assessment was found to be useful in determining the safety implications of component outages. These new maintenance strategies are now making use of predictive and condition based maintenance techniques to anticipate equipment breakdown and schedule preventive maintenance as the need arises rather than time based. Some of these techniques include valve diagnostics, vibration monitoring, oil analysis, thermography. Of course, these tools and techniques must form part of an overall maintenance management system to ensure that maintenance becomes a living program. To facilitate this process and contain costs, new information technology tools are being introduced to provide system engineers

  10. The effects of student self-assessment on learning in removable prosthodontics laboratory.

    Science.gov (United States)

    Chambers, David W; LaBarre, Eugene E

    2014-05-01

    It has been consistently shown that there is a weak association between student self-assessment and faculty member assessment of student projects in preclinical technique laboratory settings and that students overestimate their performance. Greater overestimation is observed among students judged by faculty to be the weakest, and these students also use a wider range of scores. This study hypothesized that student self-assessment is a function of capacity to perform, accuracy of understanding grading standards, and psychological factors. Further it hypothesized that learning, defined as change in performance, is a function of ability and self-assessment. Dental students at one U.S. dental school self-assessed their performance on two projects in a removable prosthodontics laboratory course separated by a six-month period. Faculty evaluations of these projects were used to determine students' understanding of the criteria for the projects, and a standardized psychological test was used to assess the learning orientation of the students. A statistical correction was made for the artifact of regression toward the mean. The study found that self-assessment was a better predictor of future learning under these circumstances than was evaluation by faculty members.

  11. Effect of a procedural video CD and study guide on the practical fixed prosthodontic performance of Iranian dental students.

    Science.gov (United States)

    Nikzad, Sakineh; Azari, Abbas; Mahgoli, Hosseinali; Akhoundi, Nasrin

    2012-03-01

    Dental students in programs around the world typically pass preclinical courses before entering the clinic and working on actual patients. Since fixed prosthodontics is a preclinical course that requires a great deal of effort, students may experience a substantial amount of stress that may affect their self-confidence and/or clinical performance. In this study, an instructional video CD (VCD) and study guide depicting the step-by-step procedures involved in a metal-ceramic tooth preparation and provisional crown fabrication was prepared. Students at the Faculty of Dentistry, Tehran University of Medical Sciences, Tehran, Iran, were divided randomly into two groups. Group A students trained as usual with live patients, and Group B students were given a copy of the VCD and study guide following a lecture. The students in Group B were encouraged to read the study guide and watch the VCD after live demonstrations. Then, both groups practiced individually on mannequins. At the end of the course, the students completed a sixteen-item questionnaire about their stress level, self-confidence, and knowledge base. The results showed that the students exposed to the extra media performed significantly better on some practical phases, e.g., laboratory procedures. A moderate, insignificant correlation was detected between exposure to media and decreasing the students' stress and self-esteem. We concluded that supplementary teaching aids such as a VCD and study guide may improve the clinical performance of dental students to some extent, but the live demonstration is still preferred by students.

  12. Application of reliability centered maintenance to Embalse NPP

    International Nuclear Information System (INIS)

    Torres, Antonio; Perdomo, Manuel; Fornero, Damian; Corchera, Roberto

    2010-01-01

    One of the most recent applications of Probabilistic Safety Analysis to Embalse NPP is the Safety Oriented Maintenance Program developed through the Reliability Centered Maintenance (RCM) methodology. Such an application was carried out by a cooperated effort between the staff of nuclear safety department of NPP and experts from Instituto Superior de Tecnologias y Ciencias Aplicadas of Cuba. So far 6 technological systems have been analyzed with important results regarding the optimization of preventive and predictive maintenance program of those systems. Any tasks of RCM were automated via MOSEG code. The results of this study were focused on the elaboration and modification of the Preventive Program, prioritization of stocks, reorientation of predictive techniques and modification in the time parameters of maintenance. (author)

  13. Risk-informed optimisation of railway tracks inspection and maintenance procedures

    International Nuclear Information System (INIS)

    Podofillini, Luca; Zio, Enrico; Vatn, Jorn

    2006-01-01

    Nowadays, efforts are being made by the railway industry for the application of reliability-based and risk-informed approaches to maintenance optimisation of railway infrastructures, with the aim of reducing the operation and maintenance expenditures while still assuring high safety standards. In particular, in this paper, we address the use of ultrasonic inspection cars and develop a methodology for the determination of an optimal strategy for their use. A model is developed to calculate the risks and costs associated with an inspection strategy, giving credit to the realistic issues of the rail failure process and including the actual inspection and maintenance procedures followed by the railway company. A multi-objective optimisation viewpoint is adopted in an effort to optimise inspection and maintenance procedures with respect to both economical and safety-related aspects. More precisely, the objective functions here considered are such to drive the search towards solutions characterized by low expenditures and low derailment probability. The optimisation is performed by means of a genetic algorithm. The work has been carried out within a study of the Norwegian National Rail Administration (Jernbaneverket)

  14. Japanese maintenance centres strive for greater realism

    International Nuclear Information System (INIS)

    Nedderman, J.

    1987-01-01

    Japanese utilities have devoted considerable efforts to ensuring that realistic plant conditions are simulated at their maintenance centres. In some centres, eg that of Kansai Electric Power Co, realism extends to difficult access, limited lighting and restricted ventilation. (author)

  15. Applicability of Operational Research Techniques in CANDU Nuclear Plant Maintenance

    International Nuclear Information System (INIS)

    Doyle, E. Kevin

    2002-01-01

    As previously reported at ICONE 6 in New Orleans, 1996, and ICONE 9 in Niece, 2001, the use of various maintenance optimization techniques at Bruce has lead to cost effective preventive maintenance applications for complex systems. Innovative practices included greatly reducing Reliability Centered Maintenance (RCM) costs while maintaining the accuracy of the analysis. The optimization strategy has undergone further evolution and at the present an Integrated Maintenance Program (IMP) is being put in place. Further cost refinement of the station preventive maintenance strategy whereby decisions are based on statistical analysis of historical failure data is being evaluated. A wide range of Operational Research (OR) literature was reviewed for implementation issues and several encouraging areas were found that will assist in the current effort of evaluating maintenance optimization techniques for nuclear power production. The road ahead is expected to consist first of resolving 25 years of data issues and preserving the data via appropriate knowledge system techniques while post war demographics permit experts to input into the system. Subsequent analytical techniques will emphasize total simplicity to obtain the requisite buy in from Corporate Executives who possibly are not trained in Operational Research. Case studies of containment airlock seal failures are used to illustrate the direct applicability of stochastic processes. Airlocks and transfer chambers were chosen as they have long been known as high maintenance items. Also, the very significant financial consequences of this type of failure will help to focus the attention of Senior Management on the effort. Despite substantial investment in research, improvement in the design of the seal material or configuration has not been achieved beyond the designs completed in the 1980's. Overall, the study showed excellent agreement of the relatively quick stochastic methods with the maintenance programs produced at

  16. Risk based maintenance: Resource requirements and organizational challenges

    International Nuclear Information System (INIS)

    Weerakkody, S.D.

    2000-01-01

    10CFR50.65 'Requirements for Monitoring the Effectiveness of Maintenance at Nuclear Power Plants' required licensees to monitor the performance or condition of structures, systems, or components (SSCs) against licensee established goals, in a manner sufficient to provide reasonable assurance that such SSCs are capable of fulfilling their intended functions. The goals were required to be commensurate with safety significance and operating experience. Northeast Utilities relied upon PRAs to implement 10CFR50.65, which is also referred to as the 'Maintenance Rule'. The Maintenance Rule changed some aspects of maintenance of structures, systems, and components (SSC) at nuclear power plants. One objective of the rule was to focus the maintenance resources based on risk significance of components. This paper will discuss the organizational challenges and resource requirements associated with implementation of the Maintenance Rule at nuclear facilities that are supported by the Northeast Utilities Services Company (NUSCo). The paper will discuss (a) how these challenges were addressed, (b) the resources required for ongoing efforts to support the Maintenance Rule, and (c) several key safety benefits derived from the implementation of the Maintenance Rule. (author)

  17. Operation and maintenance results from ISFOC CPV plants

    Science.gov (United States)

    Gil, Eduardo; Martinez, María; de la Rubia, Oscar

    2017-09-01

    The analysis of field operation and maintenance data collected during a period of over eight years, from CPV installations consisting of three different CPV technologies (including second generation of one of these technologies), has allowed us to get valuable information about the long-term degradation of the CPV systems. Through the study of the maintenance control ratio previously defined and by applying the root cause analysis methodology, the components responsible for the most unplanned interventions for each technology were identified. Focusing maintenance efforts on these components, a reduction of the unplanned interventions and the total cost of maintenance has been achieved over the years. Therefore, the deployment of an effective maintenance plan, identifying critical components, is essential to minimize the risk for investors and maximize the CPV power plants lifetime and energy output, increasing the availability of CPV installations, boosting market confidence in CPV systems.

  18. Optimising agile development practices for the maintenance operation: nine heuristics

    DEFF Research Database (Denmark)

    Heeager, Lise Tordrup; Rose, Jeremy

    2014-01-01

    Agile methods are widely used and successful in many development situations and beginning to attract attention amongst the software maintenance community – both researchers and practitioners. However, it should not be assumed that implementing a well-known agile method for a maintenance department...... is therefore a trivial endeavour - the maintenance operation differs in some important respects from development work. Classical accounts of software maintenance emphasise more traditional software engineering processes, whereas recent research accounts of agile maintenance efforts uncritically focus...... on benefits. In an action research project at Aveva in Denmark we assisted with the optimisation of SCRUM, tailoring the standard process to the immediate needs of the developers. We draw on both theoretical and empirical learning to formulate nine heuristics for maintenance practitioners wishing to go agile....

  19. Significance of Building Maintenance Management Systems towards Sustainable Development

    Directory of Open Access Journals (Sweden)

    M.A. Othuman Mydin

    2014-05-01

    Full Text Available Building maintenance management is an organized and effective system of maintenance operations which is set up to deal with problems related to the upkeep of a building. Its goal, aside from locating and remedying a building’s deficiencies, is to effectively minimize the overall costs of maintenance and is also an effort to maximize the gain and benefits from the savings. There are a few factors that influence decisions to undertake maintenance work. The principal goal of maintenance is to protect a building in the early stage of issues as they arise. Some major reasons for maintaining a building include retaining its reputation and value of investments, maintaining the building in a condition which allows it to accomplish its purpose, and presenting a good outer shell. This paper will review and discuss some of the major elements of building maintenance towards achieving sustainable buildings.

  20. Factors associated with tooth loss and prosthodontic status among Sudanese adults.

    Science.gov (United States)

    Khalifa, Nadia; Allen, Patrick F; Abu-bakr, Neamat H; Abdel-Rahman, Manar E

    2012-01-01

    A study was conducted to determine the degree of tooth loss, factors influencing tooth loss, and the extent of prosthodontic rehabilitation in Sudanese adults (≥ 16 years old) attending outpatient clinics in Khartoum State. Pearson and multivariate analyses were used to examine the relationships between tooth loss and specific characteristics determined through interviews and clinical examinations. The mean number of missing teeth was 3.6 (SD, 4.9) and the prevalence of edentulism was 0.1%. The prevalence of tooth loss (missing at least one tooth) was 78%; 66.9% of tooth loss was due to caries, and 11.2% was attributable to other reasons. Prosthetic replacement of missing teeth was evident in 3%, whereas a need for prosthetic replacement was evident in 57%. Having teeth was associated with age, gender, and socioeconomic status; tooth loss due to caries was associated with age, tribe, frequency of tooth-brushing, and a low rate of dental consultation. Tooth loss due to other reasons was associated with age, tribe, education, periodontal pocketing, tobacco use, tooth wear, and prosthetic status. The results of the present study indicated that the major cause of tooth loss was dental caries, thus emphasizing the importance of a public prevention-based healthcare program. Replacement of missing teeth was uncommon in the study subjects, which may reflect lack of access to this type of oral healthcare.

  1. Comparison of the pain levels of computer-controlled and conventional anesthesia techniques in prosthodontic treatment

    Directory of Open Access Journals (Sweden)

    Murat Yenisey

    2009-10-01

    Full Text Available OBJECTIVE: The objective of this study was to compare the pain levels on opposite sides of the maxilla at needle insertion during delivery of local anesthetic solution and tooth preparation for both conventional and anterior middle superior alveolar (AMSA technique with the Wand computer-controlled local anesthesia application. MATERIAL AND METHODS: Pain scores of 16 patients were evaluated with a 5-point verbal rating scale (VRS and data were analyzed nonparametrically. Pain differences at needle insertion, during delivery of local anesthetic, and at tooth preparation, for conventional versus the Wand technique, were analyzed using the Mann-Whitney U test (p=0.01. RESULTS: The Wand technique had a lower pain level compared to conventional injection for needle insertion (p0.05. CONCLUSIONS: The AMSA technique using the Wand is recommended for prosthodontic treatment because it reduces pain during needle insertion and during delivery of local anaesthetic. However, these two techniques have the same pain levels for tooth preparation.

  2. On condition based maintenance policy

    Directory of Open Access Journals (Sweden)

    Jong-Ho Shin

    2015-04-01

    Full Text Available In the case of a high-valuable asset, the Operation and Maintenance (O&M phase requires heavy charges and more efforts than the installation (construction phase, because it has long usage life and any accident of an asset during this period causes catastrophic damage to an industry. Recently, with the advent of emerging Information Communication Technologies (ICTs, we can get the visibility of asset status information during its usage period. It gives us new challenging issues for improving the efficiency of asset operations. One issue is to implement the Condition-Based Maintenance (CBM approach that makes a diagnosis of the asset status based on wire or wireless monitored data, predicts the assets abnormality, and executes suitable maintenance actions such as repair and replacement before serious problems happen. In this study, we have addressed several aspects of CBM approach: definition, related international standards, procedure, and techniques with the introduction of some relevant case studies that we have carried out.

  3. Routine maintenance prolongs ESP time between failures

    International Nuclear Information System (INIS)

    Hurst, T.; Lannom, R.W.; Divine, D.L.

    1992-01-01

    This paper reports that routine maintenance of electric submersible motors (ESPs) significantly lengthened the mean time between motor failures (MTBF), decreased operating costs, and extended motor run life in the Sacroc Unit of the Kelly-Snyder field in West Texas. After the oil price boom of the early 1980s. rapidly eroding profit margins from producing properties caused a much stronger focus on reducing operating costs. In Sacroc, ESP operating life and repair costs became a major target of cost reduction efforts. The routine ESP maintenance program has been in place for over 3 years

  4. Operation and maintenance requirements of system design bases

    International Nuclear Information System (INIS)

    Banerjee, A.K.; Hanley, N.E.

    1989-01-01

    All system designs make assumptions about system operation testing, inspection, and maintenance. Existing industry codes and standards explicitly address design requirements of new systems, while issues related to system and plant reliability, life, design margins, effects of service conditions, operation, maintenance, etc., usually are implicit. However, system/component design documents of existing power plants often address the code requirements without considering the operation, maintenance, inspection, and testing (OMIT) requirements. The nuclear industry is expending major efforts at most nuclear power plants to reassemble and/or reconstitute system design bases. Stone ampersand Webster Engineering Corporation (SWEC) recently addressed the OMIT requirements of system/component design as an integral part of a utility's preventive maintenance program. For each component, SWEC reviewed vendor recommendations, NPRDS data/industry experience, the existing maintenance program, component service conditions, and actual plant experience. A maintenance program that considers component service conditions and plant experience ensures a connection between maintenance and design basis. Root cause analysis of failure and engineering evaluation of service condition are part of the program. System/component OMIT requirements also are compared against system design, service condition, degradation mechanism, etc., through system/component life-cycle evaluation

  5. Six-year clinical outcome of single implant-retained mandibular overdentures--a pilot study.

    Science.gov (United States)

    Passia, Nicole; Wolfart, Stefan; Kern, Matthias

    2015-10-01

    The aim of this prospective pilot study was to evaluate the prosthodontic maintenance as well as the implant outcome of single implant-retained mandibular overdentures over an observation period of 6 years. Eleven edentulous patients received one single implant in the midline of the mandible. Denture bases were temporarily relined and 2 months later provided with a ball attachment for implant retention. Implant related parameters and prosthodontic maintenance interventions were assessed 4 weeks after implant loading and then once a year. Over a mean observation period of 75.9 months, no implant was lost. The most frequent prosthetic maintenance intervention was activation of the matrix due to loss of retention, followed by exchange of the female part. Eight denture bases had to be repaired after a fracture in the midline area. Within the limitations of this preliminary clinical study, the concept of a single midline implant to retain a mandibular complete denture was a successful treatment option for elderly edentulous patients. © 2014 John Wiley & Sons A/S. Published by John Wiley & Sons Ltd.

  6. Reducing maintenance costs

    International Nuclear Information System (INIS)

    Zaiss, W.; Reuschle, K.; Baier, B.

    2002-01-01

    The increasingly more expensive maintenance measures, cuts in the cost budget, and the loss of know-how on the part of vendors all require a change of policy with respect to maintenance concepts of the part of operators. This also applies to the existing valve concepts, the drives included. Under these aspects, the current drive, which is self-actuated and actuated by outside media, for a parallel-plate valve of a nomial width of 700 was reconsidered. The effort served to reduce maintenance costs and, at the same time, simplify the drive concept as well as cut back on the number of in-service inspections. Moreover, the number of active components were to be minimized and installation conditions in the plant were to be improved. When the boundary conditions to be observed with respect to process technology had been laid down, the competent technical department developed a concept of modification of the drive. A major constituent part was the demonstration of the functioning capability of the new drive under accident conditions. It was achieved mainly by an analytical approach. In the resultant drive concept, the same control valves are employed to actuate a driving cylinder by means of self-actuation or by an outside medium as a function of pressure. (orig.) [de

  7. Aging management and preventive maintenance for nuclear power plants

    International Nuclear Information System (INIS)

    Bessho, Toichi; Sagawa, Wataru; Oyamada, Osamu; Uchida, Shunsuke

    1995-01-01

    It is expected that nuclear power generation will bear main electric power supply for long term. For this purpose, by applying proper preventive maintenance to the nuclear power plants in operation, the maintenance of high reliability and the rate of plant operation is extremely important. Especially it has been strongly demanded to execute efficiently the periodic inspection which is carried out every year to shorten its period and increase the rate of operation, and to maintain the reliability by the proper maintenance for the aged plants with long operation years. As to efficient and short periodic inspection, the preparation is advanced by the guidance of electric power companies aiming at realizing it in nearest fiscal year, and further, effort is exerted for the development of technology in long term to optimize periodic inspection. For securing the reliability of aged plants, it is important to do proper inspection and diagnosis and to take the countermeasures by repair and replacement, based on the grasp of secular change mechanism and the evaluation of life of machinery, equipment and materials. In particular, effort is exerted for the development of maintenance technology for reactor pressure vessels and in-core equipment which are hard to access. The confirmation of the function of remote operation equipment and the establishment of execution condition are carried out by uisng the full scale mock-up of BWR plant. The problems in maintenance service and the activities and results of reliability improvement are reported. (K.I.)

  8. Mining Surveillance and Maintenance Dollars

    International Nuclear Information System (INIS)

    MARTINEZ, R.

    2000-01-01

    Accelerating site cleanup to reduce facility risks to the workers, the public and the environment during a time of declining federal budgets represents a significant technical and economic challenge to U.S. Department of Energy (DOE) Operations Offices and their respective contractors. A significant portion of a facility's recurring annual expenses are associated with routine, long-term surveillance and maintenance (S and M) activities. However, ongoing S and M activities do nothing to reduce risks and basically spend money that could be reallocated towards facility deactivation. This paper discusses the background around DOE efforts to reduce surveillance and maintenance costs, one approach used to perform cost reviews, lessons learned from field implementation and what assistance is available to assist DOE sites in performing these evaluations

  9. Walking a single path with spirit over maintenance for the past two decades

    International Nuclear Information System (INIS)

    2004-04-01

    This book reports the 20 years history of KPS. It is divided into fire chapters, which describes history of power, development of power industry in Korea, establishment of Hana Company, the first maintenance company, early business and establishment of KEPCO, effort for management and independence for technology, man power management, establishment of Korea plant service and Engineering CO. LTD, effort for the accumulation of technology and extension of business, growth as the technical company for generation of electricity and maintenance, management innovation safety and health policy and management ethics.

  10. Human factors interventions to reduce human errors and improve productivity in maintenance tasks

    International Nuclear Information System (INIS)

    Isoda, Hachiro; Yasutake, J.Y.

    1992-01-01

    This paper describes work in progress to develop interventions to reduce human errors and increase maintenance productivity in nuclear power plants. The effort is part of a two-phased Human Factors research program being conducted jointly by the Central Research Institute of Electric Power Industry (CRIEPI) in Japan and the Electric Power Research Institute (EPRI) in the United States. The overall objective of this joint research program is to identify critical maintenance tasks and to develop, implement and evaluate interventions which have high potential for reducing human errors or increasing maintenance productivity. As a result of the Phase 1 effort, ten critical maintenance tasks were identified. For these tasks, over 25 candidate interventions were identified for potential development. After careful analysis, seven interventions were selected for development during Phase 2. This paper describes the methodology used to analyze and identify the most critical tasks, the process of identifying and developing selected interventions and some of the initial results. (author)

  11. Maintenance as a safety issue.

    Science.gov (United States)

    White, Jim

    2008-11-01

    Because safety is related to electrical power systems maintenance, it seems reasonable to assume there could be legal issues if maintenance is not performed. OSHA has not yet taken the stand that not performing maintenance as required by the manufacturer, NFPA 70B, or ANSI/NETA MTS-07 constitutes a willful violation. OSHA defines a willful citation as one where: "the employer knowingly commits with plain indifference to the law. The employer either knows that what he or she is doing constitutes a violation, or is aware that a hazardous condition existed and made no reasonable effort to eliminate it". However, NFPA 70E 2009 requires this maintenance, and OSHA has stated on its Web site that NFPA 70E is "a guide for meeting the requirements of the OSHA electrical regulations". In addition, federal courts have found that NFPA 70E is "standard industry practice." Once a company receives and accepts a willful citation, especially if received as the result of an accident investigation, its worker's compensation protection no longer shields it. One definition given by a trial attorney for a willful citation was that it is equal to negligent behavior. Be smart: Maintain that equipment and save yourself major problems, including unscheduled shutdowns and possible litigation.

  12. Perforation of dental gloves during prosthodontic treatments as assessed by the conductivity and water inflation tests.

    Science.gov (United States)

    Nikawa, H; Hamada, T; Tamamoto, M; Abekura, H; Murata, H

    1996-01-01

    The incidence of latex glove perforation during prosthodontic treatment was investigated on 122 occasions using two methods, a conductivity test and a water inflation test. Latex glove perforation was detected in 38.5% of the treatments by the conductivity test and in 27.9% by the water inflation test. The perforation went unrecognized in 74.7% of the occurrences (35/47 incidents) using the conductivity test and in 64.7% (22/34) when the water inflation test was used. Of the total 55 glove perforations, 21 perforations were detected only by conductivity test, 3 were detected only by the water inflation test, and 31 perforations were detected by both methods, which suggested that the conductivity test is more sensitive than the water inflation test for the detection of glove perforation. The results of this research suggested that even when latex gloves are worn, the risk to prosthodontists of exposure to body fluids remains in four of every six treatments, often without the awareness of the prosthodontist.

  13. Preventive maintenance at the Forsmark Nuclear Power Plant

    International Nuclear Information System (INIS)

    Danielsson, H.

    1985-01-01

    The maintenance system at the Forsmark Nuclear Power Plant began in 1975, and was drawn up in co-operation with other power stations within the control of the Swedish State Power Board. Preventive maintenance (PM) is part of the system and has been in operation since 1978. Great efforts have been made to build up the system and to gather input data. Since 1981, the system has been in continuous use; follow-ups and system and quality improvements in database contents have been carried out. Great effort has also been devoted to maintaining a high quality of database contents and to the interplay between the different PM measures. We believe that PM plays an important role in the safety and economic operation of the power station and that it is essential that interest in PM should exist at all levels of the power company. (author)

  14. Proficiency evaluation of maintenance personnel: Training equivalency determination

    International Nuclear Information System (INIS)

    Price, W.J.

    1991-01-01

    The nuclear industry has recognized the importance of safe, quality, productive maintenance practices and has taken a number of initiatives that have generally improved maintenance programs. Because proficient maintenance practices are critical to plant safety and reliability, most plants have also recognized the need for reliable, valid testing techniques that demonstrate and assure the competence of their maintenance personnel. Until now, resource demands were too great to develop in-plant testing programs. In the past, maintenance supervisors have exempted personnel from training, using informal judgment of the employees' previous training and experience and informal observation of the employee on the job. While this procedure may have some degree of validity, it fails to provide the documentation for training equivalency that is required to satisfy the US Nuclear Regulatory Commission (NRC) regulations and Institute of Nuclear Power Operations (INPO) guidelines. To assess and demonstrate the proficiency levels of personnel, Calvert Cliffs needed to establish an objective, reliable, time-saving, and valid system to evaluate the competency levels of personnel. This was done in a joint effort with the Electric Power Research Institute

  15. Reliability Centered Maintenance for Savannah River Site's interim waste management facilities

    International Nuclear Information System (INIS)

    Hauer, K.A.; Wilson, J.F.

    1992-01-01

    The application of Reliability Centered Maintenance (RCM) has been shown to be an effective means to optimize maintenance programs or to establish new programs. The key to success of any RCM program is to customize the methodology to meet the specific needs of the implementing organization. This paper discusses how RCM is being used to establish the preventive maintenance program and how the resulting system data is being used to support the Technical Baseline reconstitution effort for the interim Waste Management Division of Westinghouse Savannah River Company (WSRC)

  16. Optimizing preventive maintenance with maintenance templates

    International Nuclear Information System (INIS)

    Dozier, I.J.

    1996-01-01

    Rising operating costs has caused maintenance professionals to rethink their strategy for preventive maintenance (PM) programs. Maintenance Templates are pre-engineered PM task recommendations for a component type based on application of the component. Development of the maintenance template considers the dominant failure cause of the component and the type of preventive maintenance that can predict or prevent the failure from occurring. Maintenance template development also attempts to replace fixed frequency tasks with condition monitoring tasks such as vibration analysis or thermography. For those components that have fixed frequency PM intervals, consideration is given to the maintenance drivers such as criticality, environment and usage. This helps to maximize the PM frequency intervals and maximize the component availability. Maintenance Templates have been used at PECO Energy's Limerick Generating Station during the Reliability Centered Maintenance (RCM) Process to optimize their PM program. This paper describes the development and uses of the maintenance templates

  17. A Six-Year Predictive Test of Adolescent Family Relationship Quality and Effortful Control Pathways to Emerging Adult Social and Emotional Health

    Science.gov (United States)

    Fosco, Gregory M.; Caruthers, Allison S.; Dishion, Thomas J.

    2012-01-01

    This longitudinal study examined how a multimethod (youth report, parent report, direct observation) assessment of family relationship quality (cohesion and conflict) in adolescence (age 16 –17) predicted growth and maintenance of effortful control across ages 17, 22, and 23 years old, and, ultimately, subjective well-being, emotional distress, and aggressive behavior in emerging adulthood (23). A diverse sample of 792 youth at age 17 and their families, and youth at ages 22 and 23, were studied to examine family cohesion and conflict and the growth and maintenance of effortful control as predictors of emerging adult social and emotional health. Results indicated that family cohesion and conflict during late adolescence and mean-level effortful control at age 22 each served as unique pathways to emerging adult adjustment. These findings underscore the importance of family functioning during adolescence and the maintenance of effortful control into emerging adulthood for understanding adjustment during the emerging adulthood period. PMID:22709261

  18. Scalable Coverage Maintenance for Dense Wireless Sensor Networks

    Directory of Open Access Journals (Sweden)

    Jun Lu

    2007-06-01

    Full Text Available Owing to numerous potential applications, wireless sensor networks have been attracting significant research effort recently. The critical challenge that wireless sensor networks often face is to sustain long-term operation on limited battery energy. Coverage maintenance schemes can effectively prolong network lifetime by selecting and employing a subset of sensors in the network to provide sufficient sensing coverage over a target region. We envision future wireless sensor networks composed of a vast number of miniaturized sensors in exceedingly high density. Therefore, the key issue of coverage maintenance for future sensor networks is the scalability to sensor deployment density. In this paper, we propose a novel coverage maintenance scheme, scalable coverage maintenance (SCOM, which is scalable to sensor deployment density in terms of communication overhead (i.e., number of transmitted and received beacons and computational complexity (i.e., time and space complexity. In addition, SCOM achieves high energy efficiency and load balancing over different sensors. We have validated our claims through both analysis and simulations.

  19. Robustness evaluation of cutting tool maintenance planning for soft ground tunneling projects

    Directory of Open Access Journals (Sweden)

    Alena Conrads

    2018-03-01

    Full Text Available Tunnel boring machines require extensive maintenance and inspection effort to provide a high availability. The cutting tools of the cutting wheel must be changed timely upon reaching a critical condition. While one possible maintenance strategy is to change tools only when it is absolutely necessary, tools can also be changed preventively to avoid further damages. Such different maintenance strategies influence the maintenance duration and the overall project performance. However, determine downtime related to a particular maintenance strategy is still a challenging task. This paper shows an analysis of the robustness to achieve the planned project performance of a maintenance strategy considering uncertainties of wear behavior of the cutting tools. A simulation based analysis is presented, implementing an empirical wear prediction model. Different strategies of maintenance planning are compared by performing a parameter variation study including Monte-Carlo simulations. The maintenance costs are calculated and evaluated with respect to their robustness. Finally, an improved and robust maintenance strategy has been determined. Keywords: Mechanized tunneling, Maintenance, Wear of cutting tools, Process simulation, Robustness, Uncertainty modeling

  20. Linking customisation of ERP systems to support effort: an empirical study

    Science.gov (United States)

    Koch, Stefan; Mitteregger, Kurt

    2016-01-01

    The amount of customisation to an enterprise resource planning (ERP) system has always been a major concern in the context of the implementation. This article focuses on the phase of maintenance and presents an empirical study about the relationship between the amount of customising and the resulting support effort. We establish a structural equation modelling model that explains support effort using customisation effort, organisational characteristics and scope of implementation. The findings using data from an ERP provider show that there is a statistically significant effect: with an increasing amount of customisation, the quantity of telephone calls to support increases, as well as the duration of each call.

  1. Basic concept and its aims of E-journal of advanced maintenance

    International Nuclear Information System (INIS)

    Miya, Kenzo

    2009-01-01

    This article describes basic concept and aims of EJAM with history of effort to realize the launching of it. It took about three years until launching of the journal through approach to EPRI and negotiation with international publishing companies. It consists of three major articles. They are 1) general articles, 2) academic papers and 3) maintenance technique to be applied to repairing of components of nuclear power plants. All together of these articles may contribute to understanding of clear image of what maintenance is in this journal. Finally future image of this journal is described in light of maintenance evolution. (author)

  2. The development and application of composite complexity models and a relative complexity metric in a software maintenance environment

    Science.gov (United States)

    Hops, J. M.; Sherif, J. S.

    1994-01-01

    A great deal of effort is now being devoted to the study, analysis, prediction, and minimization of software maintenance expected cost, long before software is delivered to users or customers. It has been estimated that, on the average, the effort spent on software maintenance is as costly as the effort spent on all other software costs. Software design methods should be the starting point to aid in alleviating the problems of software maintenance complexity and high costs. Two aspects of maintenance deserve attention: (1) protocols for locating and rectifying defects, and for ensuring that noe new defects are introduced in the development phase of the software process; and (2) protocols for modification, enhancement, and upgrading. This article focuses primarily on the second aspect, the development of protocols to help increase the quality and reduce the costs associated with modifications, enhancements, and upgrades of existing software. This study developed parsimonious models and a relative complexity metric for complexity measurement of software that were used to rank the modules in the system relative to one another. Some success was achieved in using the models and the relative metric to identify maintenance-prone modules.

  3. Procedures for maintenance and repairs

    International Nuclear Information System (INIS)

    Pickel, E.

    1981-01-01

    After a general review of the operation experience in the history of more than 12 operating years, the organization in the plant will be shown with special aspect to quality assurance, capacity of the workshops and connected groups as radiation protection, chemical laboratories etc. The number, time intervals and manpower effort for the repeating tests will be discussed. Reasons and examples for back-fitting activities in the plant are given. Besides special repair and maintenance procedures as repair of the steam generators, in-service inspection of the reactor pressure vessel, repair of a feed-water pipe and repair of the core structure in the pressure vessel, the general system to handle maintenance and repair-work in the KWO-plant will be shown. This includes also the detailed planning of the annual refueling and revision of the plant. (orig./RW)

  4. Maintenance Personnel Performance Simulation (MAPPS) model: a human reliability analysis tool

    International Nuclear Information System (INIS)

    Knee, H.E.

    1985-01-01

    The Maintenance Personnel Performance Simulation (MAPPS) model is a computerized, stochastic, task-oriented human behavioral model developed to provide estimates of nuclear power plant (NPP) maintenance team performance measures. It is capable of addressing person-machine, person-environment, and person-person relationships, and accounts for interdependencies that exist between the subelements that make up the maintenance task of interest. The primary measures of performance estimated by MAPPS are: (1) the probability of successfully completing the task of interest; and (2) the task duration time. MAPPS also estimates a host of other performance indices, including the probability of an undetected error, identification of the most- and least-likely error-prone subelements, and maintenance team stress profiles during task execution. The MAPPS model was subjected to a number of evaluation efforts that focused upon its practicality, acceptability, usefulness, and validity. Methods used for these efforts included a case method approach, consensus estimation, and comparison with observed task performance measures at a NPP. Favorable results, such as close agreement between task duration times for two tasks observed in the field (67.0 and 119.8 minutes, respectively), and estimates by MAPPS (72.0 and 124.0 minutes, respectively) enhance the confidence in the future use of MAPPS. 8 refs., 1 fig

  5. Remote maintenance for a new generation of hot cells

    International Nuclear Information System (INIS)

    Feldman, M.J.; Grant, N.R.

    1987-01-01

    For several years the Consolidated Fuel Reprocessing Program (CFRP) at Oak Ridge National Laboratory (ORNL) has been developing facility concepts, designing specialized equipment, and testing prototypical hardware for reprocessing spent fuel from fast breeder reactors. The major facility conceptual design, the Hot Experimental Facility, was based on total remote maintenance to increase plant availability and to reduce radiation exposure. This thrust included designing modular equipment to facilitate maintenance and the manipulation necessary to accomplish maintenance. Included in the design repetoire was the development effort in advanced servomanipulator systems, a remote sampling system, television viewing, and a transporter for manipulator positioning. Demonstration of these developed items is currently ongoing, and the technology is available for applications where production operations in highly radioactive environments are required

  6. Reliability Centered Maintenance as a tool for plant life extension

    International Nuclear Information System (INIS)

    Elliott, J.O.; Mulay, J.N.; Nakahara, Y.

    1991-01-01

    Currently in the nuclear industry there is a growing interest in lowering the cost and complexity of maintenance activities while at the same time improving plant reliability and safety in an effort to prepare for the technical and regulatory challenges of life extension. This seemingly difficult task is being aided by the introduction of a maintenance philosophy developed originally by the airline industry and subsequently applied with great success both in that industry and the U.S. military services. Reliability Centered Maintenance (RCM), in its basic form, may be described as a consideration of reliability and maintenance problems from a systems level approach, allowing a focus on preservation of system function as the aim of a maintenance program optimized for both safety and economics. It is this systematic view of plant maintenance, with the emphasis on overall functions rather than individual parts and components which sets RCM apart from past nuclear plant maintenance philosophies. It is also the factor which makes application of RCM an ideal first step in development of strategies for life extension, both for aging plants, and for plants just beginning their first license term. (J.P.N.)

  7. Preventive maintenance: optimization of time - based discard decisions at the bruce nuclear generating station

    International Nuclear Information System (INIS)

    Doyle, E.K.; Jardine, A.K.S.

    2001-01-01

    The use of various maintenance optimization techniques at Bruce has lead to cost effective preventive maintenance applications for complex systems. As previously reported at ICONE 6 in New Orleans, 1996, several innovative practices reduced Reliability Centered Maintenance costs while maintaining the accuracy of the analysis. The optimization strategy has undergone further evolution and at the present an Integrated Maintenance Program (IMP) is in place where an Expert Panel consisting of all players/experts proceed through each system in a disciplined fashion and reach agreement on all items under a rigorous time frame. It is well known that there are essentially 3 maintenance based actions that can flow from a Maintenance Optimization Analysis: condition based maintenance, time based maintenance and time based discard. The present effort deals with time based discard decisions. Maintenance data from the Remote On-Power Fuel Changing System was used. (author)

  8. Preventive maintenance and reliability-centered maintenance

    International Nuclear Information System (INIS)

    Anderson, J.G.

    1989-01-01

    In the recent past, the primary function of the preventive maintenance program at a nuclear power plant was to maintain the operability and reliability of the plant. Reducing overall maintenance costs by performing effective preventive maintenance, instead of more costly and disruptive corrective maintenance, instead of more costly and disruptive corrective maintenance, was a secondary consideration. In today's operating environment, the preventive maintenance program must meet the test of cost-effectiveness as well as many new standards for performance that are being required by rate regulators. The preventive maintenance program must be able to withstand the challenge of independent audit to a new standard of technical adequacy and compliance with recommendations from component vendors. In this new environment, the standard that is being applied at the San Onofre nuclear generating station (SONGS) is that the preventive maintenance program must meet the test of cost-effectiveness, improve equipment performance, support increased plant availability, and (a) literally implement the recommendations of the vendor, (b) provide other compensation for the vendor recommendation, or (c) provide technical justification for the deviation. The subject of this paper is the way that reliability-centered maintenance (RCM) is helping SONGS meet these challenges

  9. Good practices for effective maintenance to manage aging at NPPs

    International Nuclear Information System (INIS)

    Scott, W.B.; Enderlin, W.I.; Levy, I.S.

    1989-01-01

    The Nuclear Regulatory Commission's Office of Nuclear Regulatory Research is sponsoring this effort to study maintenance as it relates to aging, under the Nuclear Plant Aging Research (NPAR). Maintenance is the primary means of combating and correcting the effects of aging degradation at nuclear power plants. Maintenance effectiveness directly affects the safety of nuclear power plants. Several recent plant events have shown that improper maintenance or a lack of maintenance can be a significant contributory cause of plant incidents (e.g., transients at Rancho Seco and Davis Besse, and the Salem anticipated transient without scram event). In these, and other events, safety related plant equipment functions have been impaired by poor maintenance practices or a lack of maintenance on the specific equipment or in ancillary equipment that affects the ability of the safety related equipment to function. In some cases, the ancillary equipment has been nonsafety-related equipment, or balance-of-plant equipment that has not received adequate maintenance attention. In addition to the potential for causing safety significant plant transients, poor or lacking maintenance may allow the licensing basis of the plant to be eroded without detection. In some cases, time-related aging degradation of equipment that has not been detected, corrected or managed by the maintenance program has been a significant contributory factor. The NPAR program has developed significant information on aging degradation, detection, mitigation, and correction practices for safety-significant structures, systems and components that can be factored into maintenance programs and their effectiveness

  10. Optimizing stormwater treatment practices a handbook of assessment and maintenance

    CERN Document Server

    Erickson, Andrew J; Gulliver, John S

    2013-01-01

    Optimizing Stormwater Treatment Practices: A Handbook of Assessment and Maintenance provides the information necessary for developing and operating an effective maintenance program for stormwater treatment. The book offers instructions on how to measure the level of performance of stormwater treatment practices directly and bases proposed maintenance schedules on actual performance and historical maintenance efforts and costs. The inspection methods, which are proven in the field and have been implemented successfully, are necessary as regulatory agencies are demanding evaluations of the performance of stormwater treatment practices. The authors have developed a three-tiered approach that offers readers a standard protocol for how to determine the effectiveness of stormwater treatment practices currently in place. This book also: Provides a standard protocol for how to determine the effectiveness of stormwater treatment practices Assists readers with identifying which assessment techniques to use for stormwa...

  11. Opportune maintenance and predictive maintenance decision support

    OpenAIRE

    Thomas , Edouard; Levrat , Eric; Iung , Benoît; Cocheteux , Pierre

    2009-01-01

    International audience; Conventional maintenance strategies on a single component are being phased out in favour of more predictive maintenance actions. These new kinds of actions are performed in order to control the global performances of the whole industrial system. They are anticipative in nature, which allows a maintenance expert to consider non-already-planned maintenance actions. Two questions naturally emerge: when to perform a predictive maintenance action; how a maintenance expert c...

  12. Advanced remote handling for future applications: The advanced integrated maintenance system

    International Nuclear Information System (INIS)

    Herndon, J.N.; Kring, C.T.; Rowe, J.C.

    1986-01-01

    The Consolidated Fuel Reprocessing Program at Oak Ridge National Laboratory has been developing advanced techniques for remote maintenance of future US fuel reprocessing plants. The developed technology has a wide spectrum of application for other hazardous environments. These efforts are based on the application of teleoperated, force-reflecting servomanipulators for dexterous remote handling with television viewing for large-volume hazardous applications. These developments fully address the nonrepetitive nature of remote maintenance in the unstructured environments encountered in fuel reprocessing. This paper covers the primary emphasis in the present program; the design, fabrication, installation, and operation of a prototype remote handling system for reprocessing applications, the Advanced Integrated Maintenance System

  13. Risk Based Maintenance of Offshore Wind Turbines Using Bayesian Networks

    DEFF Research Database (Denmark)

    Nielsen, Jannie Jessen; Sørensen, John Dalsgaard

    2010-01-01

    This paper presents how Bayesian networks can be used to make optimal decisions for repairs of offshore wind turbines. The Bayesian network is an efficient tool for updating a deterioration model whenever new information becomes available from inspections/monitoring. The optimal decision is found...... such that the preventive maintenance effort is balanced against the costs to corrective maintenance including indirect costs to reduced production. The basis for the optimization is the risk based Bayesian decision theory. The method is demonstrated through an application example....

  14. Network level bridges maintenance planning using Multi-Attribute Utility Theory

    NARCIS (Netherlands)

    Allah Bukhsh, Zaharah; Stipanovic, Irina; Klanker, Giel; O' Connor, Alan; Doree, Andre

    2018-01-01

    Bridge infrastructure managers are facing multiple challenges to improve the availability and serviceability of ageing infrastructure, while the maintenance planning is constrained by budget restrictions. Many research efforts are ongoing, for the last few decades, ranging from development of bridge

  15. Component aging illustrated in maintenance histories from IPRDS

    International Nuclear Information System (INIS)

    Kahl, W.K.; Borkowski, R.J.

    1984-01-01

    The centerpiece of the In-Plant Reliability Data (IPRD) program is a nuclear power plant component data base developed from corrective maintenance records. The primary objective of this program is to establish a comprehensive source of information for reliability analyses, including the compilation of maintenance histories for failure statistics. The IPRD program is currently a pilot effort that has 36 reactor-years of data on pumps, valves, diesel generators, batteries, battery chargers and inverters from five nuclear plants. The data are collected under the auspices of the Institute of Electrical and Electronics Engineers (IEEE) to certify anonymity of the participating plants, and is funded by the Nuclear Regulatory Commission

  16. Remote maintenance for a new generation of hot cells

    International Nuclear Information System (INIS)

    Feldman, M.J.; Grant, N.R.

    1987-01-01

    For several years the Consolidated Fuel Reprocessing Program at the Oak Ridge National Laboratory has been developing facility concepts, designing specialized equipment, and testing prototypical hardware for reprocessing spent fuel from fast breeder reactors. The major facility conceptual design, the Hot Experimental Facility, was based on total remote maintenance to increase plant availability and to reduce radiation exposure. This thrust included designing modular equipment to facilitate maintenance and the manipulation necessary to accomplish maintenance. Included in the design repetoire was the development effort in advanced servomanipulator systems, a remote sampling system, television viewing, and a transporter system, television viewing, and a transporter for manipulator positioning. Demonstration of these developed items is currently ongoing, and the technology is available for applications where production operations in highly radioactive environments are required

  17. Mapping Operation and Maintenance Strategy for U.S. Offshore Wind Farms

    Energy Technology Data Exchange (ETDEWEB)

    Dewan, Ashish; Stehly, Tyler

    2017-06-22

    This presentation provides an overview of a collaborative effort between ECN and the National Renewable Energy Laboratory that focused on an operation and maintenance study of six offshore wind power plants in the United States.

  18. Assessment and Evaluation Report on a Pilot Project on Preventive School Maintenance in Eritrea

    DEFF Research Database (Denmark)

    Vagnby, Bo Hellisen

    In 2002, efforts started on formulating a maintenance policy for schools and other social service facilities in Eritrea. Since then, an appropriate policy and related implementation strategies have been further developed. In 2003, a specific pilot project was designed covering a number of schools...... of a school based approach to school maintenance are presented in the report....

  19. Reliability Centered Maintenance for Savannah River Site's interim waste management facilities

    Energy Technology Data Exchange (ETDEWEB)

    Hauer, K.A. (Westinghouse Savannah River Co., Aiken, SC (United States)); Wilson, J.F. (PRC, Inc. (US))

    1992-01-01

    The application of Reliability Centered Maintenance (RCM) has been shown to be an effective means to optimize maintenance programs or to establish new programs. The key to success of any RCM program is to customize the methodology to meet the specific needs of the implementing organization. This paper discusses how RCM is being used to establish the preventive maintenance program and how the resulting system data is being used to support the Technical Baseline reconstitution effort for the interim Waste Management Division of Westinghouse Savannah River Company (WSRC).

  20. Utilizing reliability concepts in the development of IEEE recommended good practices for nuclear plant maintenance

    International Nuclear Information System (INIS)

    Gradin, L.P.

    1986-01-01

    This paper presents information describing the concern for nuclear power plant electrical equipment maintenance and the IEEE Nuclear Power Engineering Committee's method to address that concern. That method includes the creation of Working Group 3.3, ''Maintenance Good Practices'' which is developing specific maintenance good practice documents, supporting technical information exchange, and providing a vehicle to promote practices which can reduce cost and enhance plant safety. The foundation for that effort is the utilization of Reliability concepts

  1. Lessons Learned from Outsourcing the Pearl Harbor MK-48 Intermediate Maintenance Activity

    National Research Council Canada - National Science Library

    Gansler, Jacques S; Lucyshyn, William; Alarcon-Deza, Benigno

    2008-01-01

    During the 1990s, active duty sailor resources were in large demand. In an effort to return sailors to the fleet, the operation of the Navy's Heavyweight Torpedo Intermediate Maintenance Activities (IMA...

  2. Game-Theoretic Models for Usage-based Maintenance Contract

    Science.gov (United States)

    Husniah, H.; Wangsaputra, R.; Cakravastia, A.; Iskandar, B. P.

    2018-03-01

    A usage-based maintenance contracts with coordination and non coordination between two parties is studied in this paper. The contract is applied to a dump truck operated in a mining industry. The situation under study is that an agent offers service contract to the owner of the truck after warranty ends. This contract has only a time limit but no usage limit. If the total usage per period exceeds the maximum usage allowed in the contract, then the owner will be charged an additional cost. In general, the agent (Original Equipment Manufacturer/OEM) provides a full coverage of maintenance, which includes PM and CM under the lease contract. The decision problem for the owner is to select the best option offered that fits to its requirement, and the decision problem for the agent is to find the optimal maintenance efforts for a given price of the service option offered. We first find the optimal decisions using coordination scheme and then with non coordination scheme for both parties.

  3. Reliability Centered Maintenance for Savannah River Site`s interim waste management facilities. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Hauer, K.A. [Westinghouse Savannah River Co., Aiken, SC (United States); Wilson, J.F. [PRC, Inc. (US)

    1992-06-01

    The application of Reliability Centered Maintenance (RCM) has been shown to be an effective means to optimize maintenance programs or to establish new programs. The key to success of any RCM program is to customize the methodology to meet the specific needs of the implementing organization. This paper discusses how RCM is being used to establish the preventive maintenance program and how the resulting system data is being used to support the Technical Baseline reconstitution effort for the interim Waste Management Division of Westinghouse Savannah River Company (WSRC).

  4. JRR-3 maintenance program utilizing accumulated maintenance data

    International Nuclear Information System (INIS)

    Izumo, Hironobu; Kato, Tomoaki; Kinase, Masami; Torii, Yoshiya; Murayama, Yoji

    2007-07-01

    JRR-3(Japan Research Reactor No.3) has been operated for more than 15 years after the modification, without significant troubles by carrying out maintenance such as the preventive maintenance (mainly time-based maintenance) for the safety-grade equipments and the breakdown maintenance for the non-safety-grade equipments. Unscheduled shutdowns causes by aged non-safety-grade equipments have been increasing, and the resources such as budgets have been decreasing year by year. In this situation, JRR-3 maintenance program was reviewed about safety, reliability and economic efficiency. This report offers the policy of the maintenance review and the future direction of maintenance programs. (author)

  5. Principles of MONJU maintenance. Characteristic of MONJU maintenance and reflection of LWR maintenance experience to FBR

    International Nuclear Information System (INIS)

    Nakai, Satoru; Nishio, Ryuichi; Uchihashi, Masaya; Kaneko, Yoshihisa; Yamashita, Hironobu; Yamaguchi, Atsunori; Aoki, Takayuki

    2014-01-01

    A sodium cooled fast breeder reactor (FBR) has unique systems and components and different degradation mechanism from light water reactor (LWR) so that need to establish maintenance technology in accordance with its features. The examination of the FBR maintenance technology is carried out in the special committee for considering the maintenance for Monju established in the Japan Society of Maintenology (JSM). As a result of the study such as extraction of Monju maintenance feature, maintenance technology benchmark between Monju and LWR components and survey of LWR maintenance experience, it is clear that principles of maintenance are same as LWR, necessity of LWR maintenance experience reflection and points to be considered in Monju maintenance. The road map to establish a FBR maintenance technology in the technical aspect became clear and it is vital to acquire operation and maintenance experience of the plant to implement this road map, and to establish a fast reactor maintenance. (author)

  6. Maintenance and Revitalization of Gallo

    DEFF Research Database (Denmark)

    Nolan, J. Shaun

    2018-01-01

    promotion organizations comprising teachers, linguists, enthusiasts, and activists are working hard at a local and regional level to ensure that there is a greater awareness of the existence of this language variety and to foster an appreciation of the importance of its maintenance and revitalization....... Whether these efforts will help Gallo become more used in eastern Brittany’s everyday sociolinguistic landscape remains to be seen. However, Gallo promotional organizations appear to be establishing the symbolic and cultural value of Gallo as part of Brittany’s languages, and are thereby solidifying...

  7. Maintenance requirements associated with mandibular implant overdentures: clinical results after first year of service.

    Science.gov (United States)

    Bilhan, Hakan; Geckili, Onur; Mumcu, Emre; Bilmenoglu, Caglar

    2011-12-01

    The aim of this clinical study was to evaluate the prosthodontic maintenance requirements during the first year of service of mandibular overdentures supported by interforaminal implants and to assess the influence of attachment type, implant number, and bite force on these requirements. Fifty-nine patients treated with mandibular implant overdentures between the years 2004 and 2009 and appearing in the 12th-month recall were included in this study. The overdentures constituted 4 groups: 2 single interforaminal implants (1 group with locator and 1 group with ball attachments), 3 single interforaminal implants, 3 splinted interforaminal implants (bar), and 4 splinted interforaminal implants (bar). During the examination, prosthetic parameters such as occlusion, tissue adaptation, condition of the retentive mechanism (matrice and patrice), and the condition of the denture-bearing tissues were evaluated and recorded. No statistically significant relation was found between attachment type, bite force values, implant number, and the occurring complications except the need for relining, which was found significantly more in the ball attachments than in other attachment groups (P  =  .03). After 12 months following the overdenture insertion, there seems to be no relation between occurring complications and patient-related factors, such as maximum bite force, age, and gender, as well as factors related to the overdentures such as number and type of attachments.

  8. Maintenance optimization and prognostics of residual life - A state of the art report

    Energy Technology Data Exchange (ETDEWEB)

    Nystad, Bent

    2006-01-15

    In many industries a huge part of the daily operational costs are related to maintenance. One key function in cutting costs is in optimization of the maintenance efforts. A major task is to change the work culture and work processes from being repair oriented, with focus on repairing breakdowns, to being proactive and maintain critical parts/systems before failures occur. Estimation of residual life distributions is of great need to obtain an optimum preventive maintenance strategy. In this report two approaches for estimation of residual life are discussed. The first model assumes that the residual life follows a Weibull distribution where the parameters are dependent on expert judgement, inspection data, repair data, and technical health trends. The second model is based on a continuous time Markov chain. In maintenance optimization a quantitative approach like the mean residual life estimation is needed in addition to a qualitative approach like the Reliability Centred Maintenance (RCM) methodology to give support for e.g. optimization of the maintenance overhaul intervals.The use of residual life knowledge in opportunistic maintenance is also discussed.(auth)

  9. Optimisation of maintenance in electric power grids; Optimierung der Instandhaltung in elektrischen Netzen

    Energy Technology Data Exchange (ETDEWEB)

    Jeromin, Ingo [Mainova AG, Frankfurt am Main (Germany); Balzer, Gerd [Technische Univ. Darmstadt (Germany). Forschungsgruppe Elektrische Energieversorgung

    2012-10-15

    During the past few years, the regulation efforts in power supply resulted in structuring of maintenance and replacement of operating facilities. Activities in this field are summarized under the heading of asset management. Investigations so far tended to focus on maintenance strategies and neglected the financial aspect, i.e. the total cost of a grid with different groups of operating facilities. The authors show strategies for solving this central problem of asset management.

  10. Analysis of trends in aviation maintenance risk: An empirical approach

    International Nuclear Information System (INIS)

    Marais, Karen B.; Robichaud, Matthew R.

    2012-01-01

    Safety is paramount in the airline industry. A significant amount of effort has been devoted to reducing mechanical failures and pilot errors. Recently, more attention has been devoted to the contribution of maintenance to accidents and incidents. This study investigates and quantifies the contribution of maintenance, both in terms of frequency and severity, to passenger airline risk by analyzing three different sources of data from 1999 to 2008: 769 NTSB accident reports, 3242 FAA incident reports, and 7478 FAA records of fines and other legal actions taken against airlines and associated organizations. We analyze several safety related metrics and develop an aviation maintenance risk scorecard that collects these metrics to synthesize a comprehensive track record of maintenance contribution to airline accidents and incidents. We found for example that maintenance-related accidents are approximately 6.5 times more likely to be fatal than accidents in general, and that when fatalities do occur, maintenance accidents result in approximately 3.6 times more fatalities on average. Our analysis of accident trends indicates that this contribution to accident risk has remained fairly constant over the past decade. Our analysis of incidents and FAA fines and legal actions also revealed similar trends. We found that at least 10% of incidents involving mechanical failures such as ruptured hydraulic lines can be attributed to maintenance, suggesting that there may be issues surrounding both the design of and compliance with maintenance plans. Similarly 36% of FAA fines and legal actions involve inadequate maintenance, with recent years showing a decline to about 20%, which may be a reflection of improved maintenance practices. Our results can aid industry and government in focusing resources to continue improving aviation safety.

  11. The right maintenance on the right components, at the right time, with the right parts: maintaining high plant reliability through an effective maintenance program

    International Nuclear Information System (INIS)

    Von Hatten, P.

    2008-01-01

    The objective of the maintenance program at a Nuclear Power Plant is to be proactive and prevent unexpected failures of equipment that can impact on Nuclear or Conventional Safety and Plant Production. This does not mean that all equipment failures will be prevented; in a number of cases the most cost effective solution is to allow equipment to run to failure. Deciding what components are critical to the plant is the first step. The industry uses guidance from INPO Advanced Process, AP913, to classify components as Critical, Non Critical or Run to Failure based on the consequence of the failure. Once this is complete, then the right maintenance program needs to be specified. This is done through utilization of experience from the industry based on the type of component. Maintenance strategies and templates have been produced for most power plant components. Each station or fleet needs then to apply the criteria, with exceptions as required, to determine the maintenance requirements and frequency for their components. This includes predictive and preventative maintenance. The more critical the component is the more rigorous the maintenance requirements. Once the maintenance program is defined it can be implemented. This requires that the Preventative Maintenance (PM's) are updated to ensure the correct tasks are in place and the frequency is correct. Work Management will group the PM's so they can scheduled efficiently and to minimize equipment down time. The last element is to ensure that the required parts are specified and are stocked or readily available for the maintenance when it is scheduled. This is an ongoing effort since components become obsolete or suppliers go out of business or change hands. (author)

  12. How Project Management Tools Aid in Association to Advance Collegiate Schools of Business (AACSB) International Maintenance of Accreditation

    Science.gov (United States)

    Cann, Cynthia W.; Brumagim, Alan L.

    2008-01-01

    The authors present the case of one business college's use of project management techniques as tools for accomplishing Association to Advance Collegiate Schools of Business (AACSB) International maintenance of accreditation. Using these techniques provides an efficient and effective method of organizing maintenance efforts. In addition, using…

  13. Program integration of predictive maintenance with reliability centered maintenance

    International Nuclear Information System (INIS)

    Strong, D.K. Jr; Wray, D.M.

    1990-01-01

    This paper addresses improving the safety and reliability of power plants in a cost-effective manner by integrating the recently developed reliability centered maintenance techniques with the traditional predictive maintenance techniques of nuclear power plants. The topics of the paper include a description of reliability centered maintenance (RCM), enhancing RCM with predictive maintenance, predictive maintenance programs, condition monitoring techniques, performance test techniques, the mid-Atlantic Reliability Centered Maintenance Users Group, test guides and the benefits of shared guide development

  14. Evaluation of the adequacy of maintenance tasks using the failure consequences of railroad vehicles

    International Nuclear Information System (INIS)

    Kim, Jaehoon; Jeong, Hyun- Yong

    2013-01-01

    The purpose of this study is to improve the efficiency, reliability and safety related to railroad maintenance tasks through an evaluation of the consequences of failures. The brake system was selected based on the failure data obtained from railroad vehicles in operation as one of the safety systems in railroad vehicles. The failure causes, failure effects, and the criticality of the failure mode were drawn for 62 failure modes of the braking system through the use of an FMECA for the 30 sub-devices having primary functions. The various maintenance tasks for the braking system were categorized into the 62 failure modes and failure consequences using the FMECA and the logic of maintenance decisions. Braking systems manufactured by the same manufacturer and operated by two different operators were studied in an effort to analyze preventive maintenance and to evaluate the adequacy of preventive maintenance tasks for the 62 failure modes. Based on results of the evaluation of these preventive maintenance tasks, new maintenance tasks were proposed, and concrete cost-cutting effects were determined from the calculation of the maintenance time and expected costs, using a preventive maintenance template developed specifically for railroad vehicles

  15. Manpower and training requirements for operation and maintenance of Nuclear Power Plants

    International Nuclear Information System (INIS)

    Shah, J.C.

    1975-01-01

    The experience in India with regard to the staffing of nuclear power station operations and maintenance is encouraging in the sense that given the effort and time, developing countries should not find it unduly difficult to meet their requirements. (orig.) [de

  16. Testosterone and reproductive effort in male primates.

    Science.gov (United States)

    Muller, Martin N

    2017-05-01

    Considerable evidence suggests that the steroid hormone testosterone mediates major life-history trade-offs in vertebrates, promoting mating effort at the expense of parenting effort or survival. Observations from a range of wild primates support the "Challenge Hypothesis," which posits that variation in male testosterone is more closely associated with aggressive mating competition than with reproductive physiology. In both seasonally and non-seasonally breeding species, males increase testosterone production primarily when competing for fecund females. In species where males compete to maintain long-term access to females, testosterone increases when males are threatened with losing access to females, rather than during mating periods. And when male status is linked to mating success, and dependent on aggression, high-ranking males normally maintain higher testosterone levels than subordinates, particularly when dominance hierarchies are unstable. Trade-offs between parenting effort and mating effort appear to be weak in most primates, because direct investment in the form of infant transport and provisioning is rare. Instead, infant protection is the primary form of paternal investment in the order. Testosterone does not inhibit this form of investment, which relies on male aggression. Testosterone has a wide range of effects in primates that plausibly function to support male competitive behavior. These include psychological effects related to dominance striving, analgesic effects, and effects on the development and maintenance of the armaments and adornments that males employ in mating competition. Copyright © 2016 Elsevier Inc. All rights reserved.

  17. Planning for maintenance in radiochemical facilities [Paper No.: VB-2

    International Nuclear Information System (INIS)

    Balasubramanian, G.R.

    1981-01-01

    Reprocessing facilities in the earlier stages of development were planned mainly based on the concept of direct maintenance in view of the inherent advantage of man-machine interface and initial savings in the investment costs. With the mechanical processes finding a firm place in head-end operation and increase in down time necessary for elaborate decontamination efforts even for a minor modification has led to the review of the concept. For the same reason, the recent plants are based on the concept of harmonious blend of both direct and remote maintenance. The paper describes the planning needed from consideration of various aspects related to such concepts of maintenance during different phases of such type of facilities, highlighting some of the tools and special equipments to be developed for this purpose. A brief description of recent development in the field of remote maintenance is also given. Though the basic hot facility of reference is the one of reprocessing fast reactor fuels, the concepts and systems discussed are equally applicable to other radiochemical and radiometallurgical facilities also. (author)

  18. Development of reliability centered maintenance methods and tools

    International Nuclear Information System (INIS)

    Jacquot, J.P.; Dubreuil-Chambardel, A.; Lannoy, A.; Monnier, B.

    1992-12-01

    This paper recalls the development of the RCM (Reliability Centered Maintenance) approach in the nuclear industry and describes the trial study implemented by EDF in the context of the OMF (RCM) Project. The approach developed is currently being applied to about thirty systems (Industrial Project). On a parallel, R and D efforts are being maintained to improve the selectivity of the analysis methods. These methods use Probabilistic Safety Study models, thereby guaranteeing better selectivity in the identification of safety critical elements and enhancing consistency between Maintenance and Safety studies. They also offer more detailed analysis of operation feedback, invoking for example Bayes' methods combining expert judgement and feedback data. Finally, they propose a functional and material representation of the plant. This dual representation describes both the functions assured by maintenance provisions and the material elements required for their implementation. In the final chapter, the targets of the future OMF workstation are summarized and the latter's insertion in the EDF information system is briefly described. (authors). 5 figs., 2 tabs., 7 refs

  19. Some aspects related to the management of maintenance for a TRIGA research reactor In Romania

    International Nuclear Information System (INIS)

    Vieru, G.

    2003-01-01

    Safety management for a nuclear research reactor involves 'good dependability management' of operations activities, such as: reliability, availability, maintainability and maintenance support. In order to evaluate the safety management aspects intended to be applied by research reactor management, the performance dependability indicators and their impact on reactor availability and reactor safety have to be established. The document ISO 9000-4/IEC 300-1 'Dependability Management' (1995), describes five internationally agreed indicators of reactor equipment dependability. Each of them can be used for corrective maintenance or for preventive maintenance, such as: I 1 - equipment Maintenance Frequency; I 2 - equipment Maintenance Effort; I 3 - equipment Maintenance Downtime Factor; I 4 - equipment Maintenance Contribution to the System Function Downtime Factor; I 5 - equipment Maintenance Contribution to the reactor Capability Loss Factor. This paper presents an evaluation of those 5 mentioned indicators with reference to the primary circuit of the INR's TRIGA research reactor and conclusion. The analyzed period was between 1994- 1999. It is to be noted that this type of analysis is performed for the first time for a research reactor. (author)

  20. Considerations in the development and implementation of a maintenance robot for nuclear power facilities

    International Nuclear Information System (INIS)

    Rohrabacher, A.; Carlton, R.; Gelhaus, F.

    1987-01-01

    The Nuclear Power Division of the Electric Power Research Institute (EPRI) began its automated nuclear plant maintenance research (research project 2232) in 1982 with surveys of domestic and Japanese ongoing and potential uses of robotic systems in nuclear power facilities. After studying these potential research areas, EPRI initiated a three-pronged effort. All surveys concluded that a mobile system for general environmental, visual, and auto surveillance would be beneficial, and EPRI contracted for the development and evaluation of the Surveyor robot. Work also began to catalog existing systems and to quantify the methodology that a utility could use to optimally complete the plant-mission, robot-system selection process. The conceptualizing phase of the effort defined the necessary physical attributes for the machine to perform a variety of maintenance tasks. Characteristics such as mobility, strength, conditions of service, materials of construction, tool functional requirements, facility interfaces, and operator interface were defined to the extent practical. Substantial versatility is required for the variability of the targeted maintenance tasks and for the variability of facility layouts and designs found throughout the nuclear industry. A key contribution to this development effort comes from the project's Utility Advisors Group. The contract's host utility provides membership to lead this group, and that company will train in the use of the machine for 6 months prior to utilizing it in their power plant for 2 yr

  1. Development of an Aviation Maintenance Curriculum in an Aerospace Engineering Department.

    Science.gov (United States)

    Miau, Jiun-Jih; Chiu, Huei-Huang; Wu, Yuh-Yi; Lin, Chin-E; Choi, Siu-Tong; Yang, Shih-Ming; Jenq, Syh-Tsang

    This paper describes the motivation of developing the Aviation Maintenance Curriculum, at National Chang Kung University (seven elective courses) contents of the elective courses, and university-industry collaborations developed along with the Curriculum. The curriculum represents an effort to respond to the needs of manpower in the aviation…

  2. Transfer of infrared thermography predictive maintenance technologies to Soviet-designed nuclear power plants: experience at Chernobyl

    Science.gov (United States)

    Pugh, Ray; Huff, Roy

    1999-03-01

    The importance of infrared (IR) technology and analysis in today's world of predictive maintenance and reliability- centered maintenance cannot be understated. The use of infrared is especially important in facilities that are required to maintain a high degree of equipment reliability because of plant or public safety concerns. As with all maintenance tools, particularly those used in predictive maintenance approaches, training plays a key role in their effectiveness and the benefit gained from their use. This paper details an effort to transfer IR technology to Soviet- designed nuclear power plants in Russia, Ukraine, and Lithuania. Delivery of this technology and post-delivery training activities have been completed recently at the Chornobyl nuclear power plant in Ukraine. Many interesting challenges were encountered during this effort. Hardware procurement and delivery of IR technology to a sensitive country were complicated by United States regulations. Freight and shipping infrastructure and host-country customs policies complicated hardware transport. Training activities were complicated by special hardware, software and training material translation needs, limited communication opportunities, and site logistical concerns. These challenges and others encountered while supplying the Chornobyl plant with state-of-the-art IR technology are described in this paper.

  3. TECHNICAL MAINTENANCE EFFICIENCY OF THE AIRCRAFT MAINTENANCE-FREE ON-BOARD SYSTEM BETWEEN SCHEDULED MAINTENANCES

    Directory of Open Access Journals (Sweden)

    A. M. Bronnikov

    2017-01-01

    Full Text Available The avionics concept of the maintenance-free on-board equipment implies the absence of necessity to maintain onboard systems between scheduled maintenance, preserving the required operational and technical characteristics; it should be achieved by automatic diagnosis of the technical condition and the application of active means of ensuring a failsafe design, allowing to change the structure of the system to maintain its functions in case of failure. It is supposed that such equipment will reduce substantially and in the limit eliminate traditional maintenance of aircraft between scheduled maintenance, ensuring maximum readiness for use, along with improving safety. The paper proposes a methodology for evaluating the efficiency of maintenance-free between scheduled maintenance aircraft system with homogeneous redundancy. The excessive redundant elements allow the system to accumulate failures which are repaired during the routine maintenance. If the number of failures of any reserve is approaching a critical value, the recovery of the on-board system (elimination of all failures is carried out between scheduled maintenance by conducting rescue and recovery operations. It is believed that service work leads to the elimination of all failures and completely updates the on-board system. The process of system operational status changes is described with the discrete-continuous model in the flight time. The average losses in the sorties and the average cost of operation are used as integrated efficiency indicators of system operation. For example, the evaluation of the operation efficiency of formalized on-board system with homogeneous redundancy demonstrates the efficiency of the proposed methodology and the possibility of its use while analyzing the efficiency of the maintenance-free operation equipment between scheduled periods. As well as a comparative analysis of maintenance-free operation efficiency of the on-board system with excessive

  4. Maintenance methods

    International Nuclear Information System (INIS)

    Sanchis, H.; Aucher, P.

    1990-01-01

    The maintenance method applied at the Hague is summarized. The method was developed in order to solve problems relating to: the different specialist fields, the need for homogeneity in the maintenance work, the equipment diversity, the increase of the materials used at the Hague's new facilities. The aim of the method is to create a knowhow formalism, to facilitate maintenance, to ensure the running of the operations and to improve the estimation of the maintenance cost. One of the method's difficulties is the demonstration of the profitability of the maintenance operations [fr

  5. Efforts to Reduce International Space Station Crew Maintenance for the Management of the Extravehicular Mobility Unit Transport Loop Water Quality

    Science.gov (United States)

    Steele, John W.; Etter, David; Rector, Tony; Boyle, Robert; Vandezande, Christopher

    2013-01-01

    The EMU (Extravehicular Mobility Unit) contains a semi-closed-loop re-circulating water circuit (Transport Loop) to absorb heat into a LCVG (Liquid Coolant and Ventilation Garment) worn by the astronaut. A second, single-pass water circuit (Feed-water Loop) provides water to a cooling device (Sublimator) containing porous plates, and that water sublimates through the porous plates to space vacuum. The cooling effect from the sublimation of this water translates to a cooling of the LCVG water that circulates through the Sublimator. The quality of the EMU Transport Loop water is maintained through the use of a water processing kit (ALCLR Airlock Cooling Loop Remediation) that is used to periodically clean and disinfect the water circuit. Opportunities to reduce crew time associated with on-orbit ALCLR operations include a detailed review of the historical water quality data for evidence to support an extension to the implementation cycle. Furthermore, an EMU returned after 2-years of use on the ISS (International Space Station) is being used as a test bed to evaluate the results of extended and repeated ALCLR implementation cycles. Finally, design, use and on-orbit location enhancements to the ALCLR kit components are being considered to allow the implementation cycle to occur in parallel with other EMU maintenance and check-out activities, and to extend the life of the ALCLR kit components. These efforts are undertaken to reduce the crew-time and logistics burdens for the EMU, while ensuring the long-term health of the EMU water circuits for a post-Shuttle 6-year service life.

  6. Interval of Routine Maintenance and Maintenance Performance: A Literature Review

    Directory of Open Access Journals (Sweden)

    Au-Yong Cheong Peng

    2016-01-01

    Full Text Available In high-rise residential buildings, the quality of facilities management services is significant to the normal operation of the facilities. Unfortunately, lack of concern towards building maintenance, especially preventive maintenance, happens in domestic housing industry in Malaysia. Majority of the maintenance operations of condominiums suffer from lack of planning, lack of proactive maintenance plan, and lack of proper implementation. Thus, this paper reviews the implementation of preventive maintenance strategy, routine maintenance in specific. An extensive review of literature published in 1987 to 2014 is performed for the purpose of this research. The publications are sourced from journal articles, conference proceedings and books. The literature analysis confirms that the routine maintenance of facilities and building services is vital and it can be influential towards the maintenance performance. Subsequently, a theoretical framework is developed, which shows the relationship between routine maintenance of building facilities & services and maintenance performance. The building facilities & services are divided into two categories. They are essential facilities & services that ensure the safety, health, habitability, and operability of buildings; while value-added facilities & services deal with property value, return on investment, and quality living of buildings. Based on the findings, a future research is proposed, which aims to identify the appropriate routine of maintenance for the facilities and services in high-rise residential buildings to improve the maintenance performance.

  7. A 5-year randomized trial to compare 1 or 2 implants for implant overdentures.

    Science.gov (United States)

    Bryant, S R; Walton, J N; MacEntee, M I

    2015-01-01

    The hypothesis of this 5-y randomized clinical trial was that there would be no significant difference in the satisfaction of edentulous participants with removable complete overdentures attached to 1 or 2 mandibular implants. Secondary aims were to test changes in satisfaction between and within the groups from baseline to 5 y and differences between the groups in implant survival and prosthodontic maintenance over 5 y. Each of the 86 participants (mean age, 67 y) was randomly allocated to receive either 1 implant in the midline (group 1) or 2 implants in the canine areas (group 2) attached to a mandibular overdenture opposing a maxillary complete denture. Satisfaction was self-assessed by participants on a visual analog scale at baseline prior to implants, as well as at 2 mo and 1, 3, and 5 y with implant overdentures, whereas implant survival and prosthodontic maintenance were assessed by clinical examination. After 5 y, 29 participants in group 1 and 33 in group 2 were available, with most dropouts due to death. Satisfaction with the implant denture after 5 y was significantly (P overdentures retained by 1 implant or 2 implants. Additional research is required to confirm long-term treatment effectiveness of single-implant dentures and the implications of prosthetic maintenance with implant overdentures (ClinicalTrials.gov: NCT02117856). © International & American Associations for Dental Research 2014.

  8. Human errors related to maintenance and modifications

    International Nuclear Information System (INIS)

    Laakso, K.; Pyy, P.; Reiman, L.

    1998-01-01

    The focus in human reliability analysis (HRA) relating to nuclear power plants has traditionally been on human performance in disturbance conditions. On the other hand, some studies and incidents have shown that also maintenance errors, which have taken place earlier in plant history, may have an impact on the severity of a disturbance, e.g. if they disable safety related equipment. Especially common cause and other dependent failures of safety systems may significantly contribute to the core damage risk. The first aim of the study was to identify and give examples of multiple human errors which have penetrated the various error detection and inspection processes of plant safety barriers. Another objective was to generate numerical safety indicators to describe and forecast the effectiveness of maintenance. A more general objective was to identify needs for further development of maintenance quality and planning. In the first phase of this operational experience feedback analysis, human errors recognisable in connection with maintenance were looked for by reviewing about 4400 failure and repair reports and some special reports which cover two nuclear power plant units on the same site during 1992-94. A special effort was made to study dependent human errors since they are generally the most serious ones. An in-depth root cause analysis was made for 14 dependent errors by interviewing plant maintenance foremen and by thoroughly analysing the errors. A more simple treatment was given to maintenance-related single errors. The results were shown as a distribution of errors among operating states i.a. as regards the following matters: in what operational state the errors were committed and detected; in what operational and working condition the errors were detected, and what component and error type they were related to. These results were presented separately for single and dependent maintenance-related errors. As regards dependent errors, observations were also made

  9. Maintenance related to life management: Survey and control of equipment ageing

    International Nuclear Information System (INIS)

    Hevia Ruperez, F.

    2000-01-01

    The aim of this paper is to review relevant objectives and aspects of the Maintenance Evaluation and Improvement Programmes for Nuclear Power Plant Life Management. Recent experience shows that current maintenance practice often fails to directly address long-term degradation that affects singular plant components and equipment populations. Instead, delayed attention to the consequences makes good Life Management unfeasible. This has brought about the need for specific Maintenance Evaluation and Improvement Programmes to adjust to the basic objective of Life Management which is to protect against, mitigate and/or monitor ageing that affects the safe, profitable life of the facility. The paper analyses the methodologies used, incidents during their application and the main conclusions reached from the implementation of these programmes in Spanish nuclear power plants. Special attention is paid to recommended solutions for improving the efficiency of the utility's contributions, its leadership in task development and integration, and its interfaces with organisations specialised in providing services that support Life Management Programmes. The coexistence of these and other similar maintenance programmes make it necessary to integrate tasks to optimise effort and tools. The paper analyses the guidelines to be considered when integrating these Programmes with other maintenance optimisation programmes (economy and feasibility, RCM) and with tasks derived from the application of Maintenance Rule regulatory requirements. Lastly, the paper reports on the state of these Maintenance Evaluation and Improvement Programmes, their development, what prospects they have, and the Industry's initiative and actions concerning the matter. (author)

  10. Comparison of genetic algorithm and harmony search for generator maintenance scheduling

    International Nuclear Information System (INIS)

    Khan, L.; Mumtaz, S.; Khattak, A.

    2012-01-01

    GMS (Generator Maintenance Scheduling) ranks very high in decision making of power generation management. Generators maintenance schedule decides the time period of maintenance tasks and a reliable reserve margin is also maintained during this time period. In this paper, a comparison of GA (Genetic Algorithm) and US (Harmony Search) algorithm is presented to solve generators maintenance scheduling problem for WAPDA (Water And Power Development Authority) Pakistan. GA is a search procedure, which is used in search problems to compute exact and optimized solution. GA is considered as global search heuristic technique. HS algorithm is quite efficient, because the convergence rate of this algorithm is very fast. HS algorithm is based on the concept of music improvisation process of searching for a perfect state of harmony. The two algorithms generate feasible and optimal solutions and overcome the limitations of the conventional methods including extensive computational effort, which increases exponentially as the size of the problem increases. The proposed methods are tested, validated and compared on the WAPDA electric system. (author)

  11. Tow plows could help Michigan save time and money on winter maintenance : research spotlight.

    Science.gov (United States)

    2016-11-01

    As winter maintenance costs rise, MDOT is looking into innovative approaches to increase snow removal efficiency. As part of this effort, the department recently estimated the costs and benefits of incorporating tow plows into its equipment fleet. Re...

  12. Remote maintenance of Compact Ignition Tokamak ex-vessel systems

    International Nuclear Information System (INIS)

    DePew, R.E.; Macdonald, D.

    1989-01-01

    The use of deuterium-tritium (D-T) fuel in the Compact Ignition Tokamak (CIT) will require applying remote handling technology for ex-vessel maintenance and replacement of machine components. Highly activated and contaminated components of the fusion device's auxiliary systems, such as diagnostics and RF heating, must be replaced using remotely operated maintenance equipment in the test cell. Throughout the CIT remote maintenance (RM) studies conducted to date, computer modeling has been used extensively to investigate manipulator access in these complex, tightly packed, and cluttered surroundings. A recent refinement of computer modeling involves the use of an intelligent engineering work station for realtime interactive display of task simulations. This paper discusses the use of three-dimensional (3-D) kinematic computer models of the CIT machines that are proving to be powerful tools in our efforts to evaluate RM requirements. This presentation includes a video-taped simulation of remote replacement of a plasma viewing assembly. The simulation illustrates some of the constraints associated with typical RM activities and the ways in which computer modeling enhances the design process. 1 ref., 3 figs

  13. [Control of generalized chronic periodontitis combined with calcium-antagonist-related gingival overgrowth by a complex periodontal-endodontic-prosthodontic treatment. Case report].

    Science.gov (United States)

    Szánto, Erika; Gera, István

    2011-12-01

    To day a relatively high percentage of elderly population of the industrialized world suffers with different cardiovascular diseases and are on permanent antihypertensive therapy. One of the most frequently used drugs is the calcium channel blockers prescribed against high blood pressure. The most common oral side effect of these drugs is the gingival enlargement that might develop even on otherwise healthy gingiva. The incidence of chronic periodontitis in this age group is also high and the Ca antagonist medication in those individuals might substantially modify the clinical course of periodontal inflammation leading to gingival enlargement and hypertrophic pocket wall. The case presented here is a 52 years old hypertonic woman with a long history of Ca-antagonist therapy and generalized chronic periodontitis combined with gingival hyperplasia. After the change of medication the 1,5 years comprehensive periodontal endodontic and prosthodontic therapy restored patient's periodontal health and provided complex dental rehabilitation. Nevertheless, only regular periodontal supportive therapy could ensure predictable outcome and guarantee long lasting periodontal health.

  14. Computer-Based Simulations for Maintenance Training: Current ARI Research. Technical Report 544.

    Science.gov (United States)

    Knerr, Bruce W.; And Others

    Three research efforts that used computer-based simulations for maintenance training were in progress when this report was written: Game-Based Learning, which investigated the use of computer-based games to train electronics diagnostic skills; Human Performance in Fault Diagnosis Tasks, which evaluated the use of context-free tasks to train…

  15. Maintenance management for nuclear power plant 'Integrated valve maintenance'

    International Nuclear Information System (INIS)

    Gerner, P.; Zanner, G.

    2001-01-01

    The deregulation of Europe's power market does force many utilities, and especially nuclear power plant operators, to introduce extensive cost-cutting measures in order to be able to compete within this new environment. The optimization of plant outages provides considerable potential for raising plant availability but can also lower operating costs by reducing e.g. expenditure on maintenance. Siemens Nuclear Power GmbH, in cooperation with plant operators, is currently implementing new and improved service concepts which can have a major effect on the way in which maintenance will be performed in the future. Innovative service packages for maintenance in nuclear power plants are available which can be used to perform a time- and cost-effective maintenance. The concepts encompass optimization of the overall sequence from planning in advance to the individual measures including reduction of the scope of maintenance activities, identification of cost cutting potential and bundling of maintenance activities. The main features of these maintenance activities are illustrated here using the examples of outage planning and integrated valve maintenance. In nuclear power plants approx. 5000 valves are periodically preventively, condition-based or breakdown-based maintained. Because of this large number of valves to be maintained a high potential of improvements and cost reductions can be achieved by performing an optimized, cost-effective maintenance based on innovative methods and tools. Siemens Nuclear Power GmbH has developed and qualified such tools which allow to reduce service costs while maintaining high standards of safety and availability. By changing from preventive to predictive (condition-based) maintenance - the number of valves to be maintained may be reduced considerably. The predictive maintenance is based on the Siemens Nuclear Power GmbH diagnostic and evaluation method (ADAM). ADAM is used to monitor the operability of valves by analytical verification of

  16. Benefits of Case-Based versus Traditional Lecture-Based Instruction in a Preclinical Removable Prosthodontics Course.

    Science.gov (United States)

    Samuelson, David B; Divaris, Kimon; De Kok, Ingeborg J

    2017-04-01

    This study compared the acceptability and relative effectiveness of case-based learning (CBL) versus traditional lecture-based (LB) instruction in a preclinical removable prosthodontics course in the University of North Carolina at Chapel Hill School of Dentistry DDS curriculum. The entire second-year class (N=82) comprised this crossover study's sample. Assessments of baseline comprehension and confidence in removable partial denture (RPD) treatment planning were conducted at the beginning of the course. Near the end of the course, half of the class received CBL and LB instruction in an RPD module in alternating sequence, with students serving as their own control group. Assessments of perceived RPD treatment planning efficacy, comprehension, and instruction method preference were administered directly after students completed the RPD module and six months later. Analyses of variance accounting for period, carryover, and sequence effects were used to determine the relative effects of each approach using a peffects, CBL was also associated with higher gains in RPD treatment planning comprehension (p=0.04) and perceived efficacy (p=0.01) compared to LB instruction. These gains diminished six months after the course-a finding based on a 49% follow-up response rate. Overall, the students overwhelmingly preferred CBL to LB instruction, and the findings suggest small albeit measurable educational benefits associated with CBL. This study's findings support the introduction and further testing of CBL in the preclinical dental curriculum, in anticipation of possible future benefits evident during clinical training.

  17. Advanced maintenance strategies for power plant operators - introducing inter-plant life cycle management. ZES research focus 'condition-based maintenance in power engineering'

    International Nuclear Information System (INIS)

    Graeber, U.

    2003-01-01

    The optimisation of maintenance activities observed in recent years can be attributed above all to the use and continuing development of testing and diagnostic techniques, to the increased level of system and component automation and to more efficient work organisation. Despite the considerable success of these efforts, the potential for further cost reductions is still far from exhausted. The risks connected to reliability, availability and safety need to be analysed in greater detail in order to ensure the sustainability of the savings already achieved as well as those yet to be realised. The systematic application of condition-based maintenance and the introduction of structured life cycle management are essential prerequisites. Within the framework of its ''Condition-Based Maintenance in Power Engineering'' research focus, the Energy Research Centre (ZES) has set up a specialist network in which experts from various institutes belonging to the Faculty of Mechanical Engineering and the Faculty of Informatic, Electrical Engineering and Information Technology can develop interdisciplinary solutions for advanced maintenance strategies. The ZES offers the industry a platform for cooperating on current issues relating to the supply of energy and supports the movement towards sustainable improvements to competitiveness through research and consulting activities. It applies professional project and quality management procedures to ensure that contracts covering interdisciplinary topics and projects are handled in a coherent manner. (orig.)

  18. The maintenance management framework models and methods for complex systems maintenance

    CERN Document Server

    Crespo Márquez, Adolfo

    2010-01-01

    “The Maintenance Management Framework” describes and reviews the concept, process and framework of modern maintenance management of complex systems; concentrating specifically on modern modelling tools (deterministic and empirical) for maintenance planning and scheduling. It will be bought by engineers and professionals involved in maintenance management, maintenance engineering, operations management, quality, etc. as well as graduate students and researchers in this field.

  19. Industrial Maintenance Strategies

    International Nuclear Information System (INIS)

    Sajjad Akbar

    2006-01-01

    Industrial plants have become more complex due to technological advancement. This has made the task of maintenance more difficult. The maintenance costs in terms of resources and downtime loss are so high that maintenance function has become a critical factor in a plant's profitability. Industry should devote as much forethought to the management of maintenance function as to production. Maintenance has grown from an art to a precise, technical engineering science. Planning, organizing scheduling and control of maintenance using modern techniques pays dividends in the form of reduced costs and increased reliability. The magnitude and the dimension of maintenance have multiplied due to development in the engineering technologies. Production cost and capacities are directly affected by the breakdown time. Total operating cost including the maintenance cost plays an important role in replacement dimension. The integrated system approach would bring forth the desired results of high maintenance standards. The standards once achieved and sustained, would add to the reliability of the plan and relieve heavy stresses and strains on the engineering logistic support. (author)

  20. Knowledge based maintenance

    Energy Technology Data Exchange (ETDEWEB)

    Sturm, A [Hamburgische Electacitaets-Werke AG Hamburg (Germany)

    1998-12-31

    The establishment of maintenance strategies is of crucial significance for the reliability of a plant and the economic efficiency of maintenance measures. Knowledge about the condition of components and plants from the technical and business management point of view therefore becomes one of the fundamental questions and the key to efficient management and maintenance. A new way to determine the maintenance strategy can be called: Knowledge Based Maintenance. A simple method for determining strategies while taking the technical condition of the components of the production process into account to the greatest possible degree which can be shown. A software with an algorithm for Knowledge Based Maintenance leads the user during complex work to the determination of maintenance strategies for this complex plant components. (orig.)

  1. Knowledge based maintenance

    Energy Technology Data Exchange (ETDEWEB)

    Sturm, A. [Hamburgische Electacitaets-Werke AG Hamburg (Germany)

    1997-12-31

    The establishment of maintenance strategies is of crucial significance for the reliability of a plant and the economic efficiency of maintenance measures. Knowledge about the condition of components and plants from the technical and business management point of view therefore becomes one of the fundamental questions and the key to efficient management and maintenance. A new way to determine the maintenance strategy can be called: Knowledge Based Maintenance. A simple method for determining strategies while taking the technical condition of the components of the production process into account to the greatest possible degree which can be shown. A software with an algorithm for Knowledge Based Maintenance leads the user during complex work to the determination of maintenance strategies for this complex plant components. (orig.)

  2. Efforts to Reduce International Space Station Crew Maintenance Time in the Management of the Extravehicular Mobility Unit Transport Loop Water Quality

    Science.gov (United States)

    Etter,David; Rector, Tony; Boyle, robert; Zande, Chris Vande

    2012-01-01

    The EMU (Extravehicular Mobility Unit) contains a semi-closed-loop re-circulating water circuit (Transport Loop) to absorb heat into a LCVG (Liquid Coolant and Ventilation Garment) worn by the astronaut. A second, single-pass water circuit (Feed-water Loop) provides water to a cooling device (Sublimator) containing porous plates, and that water sublimates through the porous plates to space vacuum. The cooling effect from the sublimation of this water translates to a cooling of the LCVG water that circulates through the Sublimator. The quality of the EMU Transport Loop water is maintained through the use of a water processing kit (ALCLR - Airlock Cooling Loop Remediation) that is used to periodically clean and disinfect the water circuit. Opportunities to reduce crew time associated with ALCLR operations include a detailed review of the historical water quality data for evidence to support an extension to the implementation cycle. Furthermore, an EMU returned after 2-years of use on the ISS (International Space Station) is being used as a test bed to evaluate the results of extended and repeated ALCLR implementation cycles. Finally, design, use and on-orbit location enhancements to the ALCLR kit components are being considered to allow the implementation cycle to occur in parallel with other EMU maintenance and check-out activities, and to extend the life of the ALCLR kit components. These efforts are undertaken to reduce the crew-time and logistics burdens for the EMU, while ensuring the long-term health of the EMU water circuits for a post- Shuttle 6-year service life.

  3. Development of preventive maintenance technology and advanced service equipment for operating nuclear power plants

    International Nuclear Information System (INIS)

    Abe, Kazuhiro; Sumikawa, Masaharu; Hirakawa, Hiromasa; Arakawa, Tadao; Hasegawa, Kunio; Kato, Kanji.

    1990-01-01

    Hitachi Ltd. as a manufacturer of nuclear power plants has carried out the consistent general preventive maintenance activities from the planning of the plants and the design of maintainability in the construction phase to the planning and working of preventive maintenance in the operation and maintenance phase, and exerted efforts to heighten the capacity ratio and reliability of the plants. For the purpose, the steady activities of reliability improvement have been carried out throughout the whole company, and the rationalization of the planning and management of the preventive maintenance with a computer and the development of the robots to which Al is applied have been promoted. As the technology of upgrading the facilities, boron racks, the control rods having long life and so on were developed, and their practical use is advanced. Moreover for the future, the development of the diagnostic technology on material deterioration using superconductive quantum interference devices (SQUID) is in progress. The preventive maintenance activities in Hitachi Ltd., the technical development for the purpose and the upgrading of the plant facilities are reported. (K.I.)

  4. Double-Shell Tanks System Maintenance and Recovery Needs Report

    International Nuclear Information System (INIS)

    SMITH, D.F.

    2002-01-01

    This report represents an initial effort to identify maintenance equipment needed to support critical components used for delivery of waste feed to the Waste Isolation and Treatment Plant (WTP). Rough estimates of cost benefits for selected maintenance capabilities are provided. A follow-on to this report should include a detailed cost analysis showing cost benefits and tradeoffs in selection and development of specific maintenance capabilities. Critical component failures during delivery of waste feed from the DSTs to the WTP have the potential to idle WTP facilities if the duration of the recovery operations are long enough to allow the WTP to exhaust a planned 60-day lag storage capacity for waste feed. If a critical component within the transfer route fails, current planning does not provide for an alternative HLW feed source. Critical components with relatively high failure frequencies and recovery times are identified, along with a summary of documentation regarding historical maintenance and recovery operations and planning. Components, such as mixer pumps and transfer pumps, are estimated to have relatively long recovery times due, in part, to the current practice of sending spare pumps, when needed, off-site to a remote location, for vendor refurbishment and testing prior to installation in a tank. No capability is provided on-site for pump ''run-in''. As neither the spare pumps in storage, installed pumps, or other critical components are subjected to periodic preventive maintenance, and these critical components are planned to be operated intermittently over a long period of time, component failures are to be expected. Recommendations are made for further analysis to identify specific equipment cost benefits, development costs, and tradeoffs in selection of alternatives. This new equipment will provide capabilities for component storage and maintenance in line with vendor recommendations, reduce the duration of recovery operations, and support personnel

  5. Perencanaan Kegiatan Maintenance Dengan Metode Reability Centered Maintenance (Rcm) II

    OpenAIRE

    Rachmad Hidayat; Nachnul Ansori; Ali Imron

    2010-01-01

    Maintenance Activity Planning by Reability Centered Maintenance (RCM) II Method. This research discussmaintenance activity by using RCM II method to determine failure function risk at compresor screw. Calculation isgiven to magnitude optimum time maintenance interval by considering the cost maintenance and the cost reparation.From the research results with RPN points out that critical component that needs to get main priority in givemaintenance on compresor screw are bust logistic on timeworn...

  6. Lean Maintenance Applied to Improve Maintenance Efficiency in Thermoelectric Power Plants

    Directory of Open Access Journals (Sweden)

    Orlando Duran

    2017-10-01

    Full Text Available Thermoelectric power plants consist of a set of critical equipment that require high levels of availability and reliability. Due to this, maintenance of these physical assets is gaining momentum in industry. Maintenance is considered as an activity that contributes to improving the availability, efficiency and productivity of each piece of equipment. Several techniques have been used to achieve greater efficiencies in maintenance, among which we can find the lean maintenance philosophy. Despite the wide diffusion of lean maintenance, there is no structured method that supports the prescription of lean tools applied to the maintenance function. This paper presents the experience gathered in two lean maintenance projects in thermoelectric power plants. The application of lean techniques was based on using a previously developed multicriterial decision making process that uses the Fuzzy Analytic Hierarchy Process (AHP methodology to carry out a diagnosis and prescription tasks. That methodology allowed the prescription of the appropriated lean techniques to resolve the main deficiencies in maintenance function. The results of applying such lean tools show that important results can be obtained, making the maintenance function in thermoelectric power plants more efficient and lean.

  7. Neural Correlates of Impaired Reward-Effort Integration in Remitted Bulimia Nervosa.

    Science.gov (United States)

    Mueller, Stefanie Verena; Morishima, Yosuke; Schwab, Simon; Wiest, Roland; Federspiel, Andrea; Hasler, Gregor

    2018-03-01

    The integration of reward magnitudes and effort costs is required for an effective behavioral guidance. This reward-effort integration was reported to be dependent on dopaminergic neurotransmission. As bulimia nervosa has been associated with a dysregulated dopamine system and catecholamine depletion led to reward-processing deficits in remitted bulimia nervosa, the purpose of this study was to identify the role of catecholamine dysfunction and its relation to behavioral and neural reward-effort integration in bulimia nervosa. To investigate the interaction between catecholamine functioning and behavioral, and neural responses directly, 17 remitted bulimic (rBN) and 21 healthy individuals (HC) received alpha-methyl-paratyrosine (AMPT) over 24 h to achieve catecholamine depletion in a randomized, crossover study design. We used functional magnetic resonance imaging (fMRI) and the monetary incentive delay (MID) task to assess reward-effort integration in relation to catecholaminergic neurotransmission at the behavioral and neural level. AMPT reduced the ability to integrate rewards and efforts effectively in HC participants. In contrast, in rBN participants, the reduced reward-effort integration was associated with illness duration in the sham condition and unrelated to catecholamine depletion. Regarding neural activation, AMPT decreased the reward anticipation-related neural activation in the anteroventral striatum. This decrease was associated with the AMPT-induced reduction of monetary earning in HC in contrast to rBN participants. Our findings contributed to the theory of a desensitized dopaminergic system in bulimia nervosa. A disrupted processing of reward magnitudes and effort costs might increase the probability of maintenance of bulimic symptoms.

  8. Geometrical effects of conventional and digital prosthodontic planning wax-ups on lateral occlusal contact number, contact area, and steepness.

    Science.gov (United States)

    Abduo, Jaafar

    2017-01-01

    This study evaluated and compared the effect of conventional and digital wax-ups on three lateral occlusion variables: contact number, contact area, and steepness. Dental casts of 10 patients with Angle Class I relationship were included in the study. All patients required fixed prosthodontic treatment that would affect lateral occlusion. The casts of all patients received conventional and digital wax-ups. For pretreatment, conventional wax-up, and digital wax-up casts, contact number, contact area, and occlusion steepness were measured at four lateral positions, that is, at excursions of 0.5, 1.0, 2.0, and 3.0 mm from maximal intercuspation. Lateral occlusion scheme variables were affected by use of diagnostic wax-ups. For all types of casts, contact number decreased as excursion increased. The two types of wax-ups had similar contact number patterns, and contact number was significantly greater for these casts than for pretreatment casts in the earlier stages of excursion. Similarly, contact area gradually decreased with increasing excursion in the pretreatment and conventional and digital wax-up casts. There was only a minimal decrease in occlusion steepness as excursion increased. However, lateral occlusion was generally steeper for digital wax-up casts.

  9. Maintenance management systems

    International Nuclear Information System (INIS)

    Rohan, M. de

    1989-01-01

    This paper is concerned principally with Maintenance Management systems and their effective introduction into organisations. Maintenance improvement is basically a problem of managing the maintenance department in the broadest sense. Improvement does not only lie in the area of special techniques, systems or procedures; although they are valuable tools, but rather in a balanced attack, carefully guided by management. Over recent years, maintenance systems have received the major emphasis and in many instances the selection of the system has become a pre-occupation, whereas the importance of each maintenance function must be recognised and good management practices applied to all maintenance activities. The ingredients for success in the implementation of maintenance management systems are summarised as: having a management committee, clear objectives, project approach using project management techniques and an enthusiastic leader, user managed and data processing supported project, realistic budget and an understanding of the financial audit requirements. (author)

  10. Advanced maintenance research programs

    International Nuclear Information System (INIS)

    Marston, T.U.; Gelhaus, F.; Burke, R.

    1985-01-01

    The purpose of this paper is to provide the reader with an idea of the advanced maintenance research program at the Electric Power Research Institute (EPRI). A brief description of the maintenance-related activities is provided as a foundation for the advanced maintenance research projects. The projects can be divided into maintenance planning, preventive maintenance program development and implementation, predictive (or conditional) maintenance, and innovative maintenance techniques. The projects include hardware and software development, human factors considerations, and technology promotion and implementation. The advanced concepts include: the incorporation of artificial intelligence into outage planning; turbine and pump maintenance; rotating equipment monitoring and diagnostics with the aid of expert systems; and the development of mobile robots for nuclear power plant maintenance

  11. Basolateral amygdala supports the maintenance of value and effortful choice of a preferred option.

    Science.gov (United States)

    Hart, Evan E; Izquierdo, Alicia

    2017-02-01

    The basolateral amygdala (BLA) is known to be involved in appetitive behavior, yet its role in cost-benefit choice of qualitatively different rewards (more/less preferred), beyond magnitude differences (larger/smaller), is poorly understood. We assessed the effects of BLA inactivations on effortful choice behavior. Rats were implanted with cannulae in BLA and trained to stable lever pressing for sucrose pellets on a progressive ratio schedule. Rats were then introduced to a choice: chow was concurrently available while they could work for the preferred sucrose pellets. Rats were infused with either vehicle control (aCSF) or baclofen/muscimol prior to test. BLA inactivations produced a significant decrease in lever presses for sucrose pellets compared to vehicle, and chow consumption was unaffected. Inactivation had no effect on sucrose pellet preference when both options were freely available. Critically, when lab chow was not concurrently available, BLA inactivations had no effect on the number of lever presses for sucrose pellets, indicating that primary motivation in the absence of choice remains intact with BLA offline. After a test under specific satiety for sucrose pellets, BLA inactivation rendered animals less sensitive to devaluation relative to control. The effects of BLA inactivations in our task are not mediated by decreased appetite, an inability to perform the task, a change in food preference, or decrements in primary motivation. Taken together, BLA supports the specific value and effortful choice of a preferred option. © 2016 Federation of European Neuroscience Societies and John Wiley & Sons Ltd.

  12. Maintenance Management Update.

    Science.gov (United States)

    Sternloff, Robert E.

    1987-01-01

    Current trends in park maintenance are overviewed, including maintenance impact statements, avoidance of cost through efficient use and national resource conservation, horticultural accomplishments that influence maintenance management, and vandalism prevention. (CB)

  13. Advanced maintenance strategies for power plant operators - introducing inter-plant life cycle management. ZES research focus 'condition-based maintenance in power engineering'

    Energy Technology Data Exchange (ETDEWEB)

    Graeber, U.

    2003-07-01

    The optimisation of maintenance activities observed in recent years can be attributed above all to the use and continuing development of testing and diagnostic techniques, to the increased level of system and component automation and to more efficient work organisation. Despite the considerable success of these efforts, the potential for further cost reductions is still far from exhausted. The risks connected to reliability, availability and safety need to be analysed in greater detail in order to ensure the sustainability of the savings already achieved as well as those yet to be realised. The systematic application of condition-based maintenance and the introduction of structured life cycle management are essential prerequisites. Within the framework of its ''Condition-Based Maintenance in Power Engineering'' research focus, the Energy Research Centre (ZES) has set up a specialist network in which experts from various institutes belonging to the Faculty of Mechanical Engineering and the Faculty of Informatic, Electrical Engineering and Information Technology can develop interdisciplinary solutions for advanced maintenance strategies. The ZES offers the industry a platform for cooperating on current issues relating to the supply of energy and supports the movement towards sustainable improvements to competitiveness through research and consulting activities. It applies professional project and quality management procedures to ensure that contracts covering interdisciplinary topics and projects are handled in a coherent manner. (orig.)

  14. Cask system maintenance in the Federal Waste Management System

    International Nuclear Information System (INIS)

    Pope, R.B.; Rennich, M.J.; Medley, L.G.; Attaway, C.R.

    1991-01-01

    In early 1988, in support of the development of the transportation system for the Office of Civilian Radioactive Waste Management System (OCRWM), a feasibility study was undertaken to define a the concept for a stand-alone, ''green-field'' facility for maintaining the Federal Waste Management System (FWMS) casks. This study provided and initial layout facility design, an estimate of the construction costs, and an acquisition schedule for a Cask Maintenance Facility (CMF). It also helped to define the interfaces between the transportation system and the waste generators, the repository, and a Monitored Retrievable Storage (MRS) facility. The data, design, and estimated costs derived from the study have been organized for use in the total transportation system decision-making process. Most importantly, they also provide a foundation for continuing design and planning efforts. The feasibility study was based on an assumed stand-alone, ''green-field'' configuration. This design approach provides a comprehensive design evaluation, to guide the development of a cost estimate and to permit flexibility in locating the facility. The following sections provide background information on cask system maintenance, briefly summarizes some of the functional requirements that a CMF must satisfy, provides a physical description of the CMF, briefly discusses the cost and schedule estimates and then reviews the findings of the efforts undertaken since the feasibility study was completed. 15 refs., 3 figs

  15. Instrumentation maintenance

    International Nuclear Information System (INIS)

    Mack, D.A.

    1976-09-01

    It is essential to any research activity that accurate and efficient measurements be made for the experimental parameters under consideration for each individual experiment or test. Satisfactory measurements in turn depend upon having the necessary instruments and the capability of ensuring that they are performing within their intended specifications. This latter requirement can only be achieved by providing an adequate maintenance facility, staffed with personnel competent to understand the problems associated with instrument adjustment and repair. The Instrument Repair Shop at the Lawrence Berkeley Laboratory is designed to achieve this end. The organization, staffing and operation of this system is discussed. Maintenance policy should be based on studies of (1) preventive vs. catastrophic maintenance, (2) records indicating when equipment should be replaced rather than repaired and (3) priorities established to indicate the order in which equipment should be repaired. Upon establishing a workable maintenance policy, the staff should be instructed so that they may provide appropriate scheduled preventive maintenance, calibration and corrective procedures, and emergency repairs. The education, training and experience of the maintenance staff is discussed along with the organization for an efficient operation. The layout of the various repair shops is described in the light of laboratory space and financial constraints

  16. Systematic maintenance analysis with decision support method and tool for optimizing maintenance programme

    International Nuclear Information System (INIS)

    Laakso, K.; Simola, K.; Dorrepaal, J.; Skogberg, P.

    1999-01-01

    This report describes an approach to evaluate the effectiveness of test and maintenance programs of technical systems used during several years. The method combines an analysis of the historical data on faults and repairs with an analysis of the history of periodic testing and preventive maintenance action programs. The application of the maintenance analysis from the methodological point of view in the reliability centered maintenance (RCM) project for Barsebaeck nuclear power plant is described. In order to limit the analysis resources, a method for ranking of objects for maintenance analysis is needed. Preliminary suggestions for changes in maintenance action programs are based on signals from simple maintenance indicators and qualitative analysis of underlying data on failures and maintenance. To facilitate generation of maintenance indicators, and make the maintenance analysis more efficient, a powerful and suitable data treatment tool is needed for analysis of the work order history. In the final maintenance decisions, additional decision criteria must be taken into account, and thus a more formal decision analysis is often needed for decision support. (au)

  17. NPP operation and maintenance with french-built NPPs

    International Nuclear Information System (INIS)

    Mira, J.J.

    1987-01-01

    In Frace, 80% of the electricity production will be nuclear in 1990. More than to-day, PWR units will be operated by ELECTRICITE DE FRANCE on a load-follow basis. Every effort is made to reduce planned and forced outages. Maintenance is shared between EDF and FRAMATOME, the latter being in charge of high technology operations. All these actions are eased by the standardization of units, within each power class, the resulting build-up of experience being available to all PWR operators in the world, more particularly to those of FRAMATOME-built units

  18. Fiscal 1999 achievement report on regional consortium research and development project. Regional consortium activity in its 2nd year (Research and development of transverse maintenance technology); 1999 nendo odanteki maintenance gijutsu no kenkyu kaihatsu seika hokokusho. 2

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    Research and development is conducted to establish a novel industrial system capable of realizing high reliability, high rate of operation, and low cost in the maintenance of plants. The research and development efforts involve the development of a maintenance system, a study of application of such a system to the working place, the development of maintenance tools, etc. In the development of technologies of pipeline damage estimation, a software program is worked out by which vibration is analyzed using data of pipeline structure inputted at the work site. In the development of an anomaly diagnosing system using acoustic emission, a technique of discriminating between deteriorated signals and noises is verified for its theoretical validity. In the development of an anomaly diagnosing system utilizing particles generated by abrasion in oil, the particle counter sensor is improved in sensitivity, and a high-accuracy diagnostic technology is established in which measurement of particle diameter distribution and analysis of abrasion-generated particle shapes are combined. When the efforts are reviewed comprehensively, it is found that 65% of the whole plan has been accomplished and that the goal set for this fiscal year has been achieved almost completely. (NEDO)

  19. With a re-engineering of maintenance to a profitably oriented maintenance

    International Nuclear Information System (INIS)

    Angelevska, Silvana; Jolevski, Tome

    2000-01-01

    This paper presents an overview of effectiveness of the profit centered maintenance as a contemporary way of the maintenance management concept. Such redesign of a maintenance procedure results in significant gains in cost reduction and increase of the profitability and competitiveness of energy. The business process re engineering - a modern management control theory that is important aspect of the profit centered maintenance is summarized

  20. Predictive maintenance: A new approach in maintenance of nuclear power plants

    International Nuclear Information System (INIS)

    Benvenuto, F.; Ferrari, L.

    2005-01-01

    The maintenance services for a Nuclear Power Plant are in general aimed at reaching the following goals: - Increase component availability and consequently decrease intervention frequency; - Reduce unexpected costs from unexpected repairs; - Progressively decrease the time of each intervention; - Improve the spare parts supply efficiency; - Improve spare parts and consumable warehouse managing; - Decrease maintenance costs. Most of the currently used maintenance activities refer to run-to-failure or preventive approaches: - Run-to-failure or Corrective Maintenance means that work is only carried out when a component or system is faulty and unable to perform its critical function. Non critical components such as filters or components with spare may be maintained in this way; - Preventive or Scheduled Maintenance involves a regular pre-set schedule programme of maintenance work. Programme outlined by the manufacturer of the component in question based on the design life of the component and based on past experience by operation. One step further than Preventive Maintenance is represented by Predictive Maintenance. Whereas Preventive Maintenance bases its schedules on past performance data, a predictive system acquires condition data from the machine to be maintained whilst the machine is in operation. The information obtained from this analysis indicates the condition in real time, provides a diagnosis of wear and shows any trend towards critical conditions. Predictive maintenance mainly consists of the following interventions: - Lubricant analysis; - Collection / analysis of functional parameters, such as motor absorption, flow rate, pressure, temperature, noise, vibration of rotating equipment, thermal efficiency, etc; - Periodical test of lifting systems; - Other operations to acquire sensitive equipment parameters. Predictive Maintenance can reduce the accidental intervention and extend the components life, and, in the end, is increasing the global availability

  1. Assessing maintenance contracts when preventive maintenance is outsourced

    International Nuclear Information System (INIS)

    Wu Shaomin

    2012-01-01

    In some companies, corrective maintenance is conducted in-house but preventive maintenance might be outsourced. This raises a need to optimise some parameters such as the number of contracts from a perspective of the equipment owner. This paper considers a maintenance policy for such a situation, analyses the roles of the parameters in a PM model, proposes approaches to defining bonus functions, and finally discusses special cases of both the PM policy and the bonus function. Numerical examples are also given to explore the impact of parameters on the expected lifecycle cost rate.

  2. Reliability database development and plant performance improvement effort at Korea Hydro and Nuclear Power Co

    International Nuclear Information System (INIS)

    Oh, S. J.; Hwang, S. W.; Na, J. H.; Lim, H. S.

    2008-01-01

    Nuclear utilities in recent years have focused on improved plant performance and equipment reliability. In U.S., there is a movement toward process integration. Examples are INPO AP-913 equipment reliability program and the standard nuclear performance model developed by NEI. Synergistic effect from an integrated approach can be far greater than as compared to individual effects from each program. In Korea, PSA for all Korean NPPs (Nuclear Power Plants) has been completed. Plant performance monitoring and improvement is an important goal for KHNP (Korea Hydro and Nuclear Power Company) and a risk monitoring system called RIMS has been developed for all nuclear plants. KHNP is in the process of voluntarily implementing maintenance rule program similar to that in U.S. In the future, KHNP would like to expand the effort to equipment reliability program and to achieve highest equipment reliability and improved plant performance. For improving equipment reliability, the current trend is moving toward preventive/predictive maintenance from corrective maintenance. With the emphasis on preventive maintenance, the failure cause and operation history and environment are important. Hence, the development of accurate reliability database is necessary. Furthermore, the database should be updated regularly and maintained as a living program to reflect the current status of equipment reliability. This paper examines the development of reliability database system and its application of maintenance optimization or Risk Informed Application (RIA). (authors)

  3. Managing nuclear maintenance

    International Nuclear Information System (INIS)

    Anon.

    1990-01-01

    For utilities operating nuclear powerplants, the rules of the game continue to change. Conflicting regulatory pressures and a tougher competitive environment will make management's job more complicated and difficult in the 1990s. Dealing with these pressures successfully requires greater attention to maintenance effectiveness. Utilities can help shape their future environment by developing a well-planned strategy to guide their actions. Parts of the strategy that are discussed include developing a sound maintenance philosophy, selecting a service company, radiation exposure, and managing spare parts. This article also addresses the Swedish experience in maintenance, German philosophy regarding maintenance and the current maintenance practices of the Electricite de France

  4. AIRCRAFT MAINTENANCE HANGAR

    Directory of Open Access Journals (Sweden)

    GEAMBASU Gabriel George

    2017-05-01

    Full Text Available The paper presents the maintenance process that is done on an airplane, at a certain period of time, or after a number of flight hours or cycles and describes the checks performed behind each inspection. The first part of research describes the aircraft maintenance process that has to be done after an updated maintenance manual according with aircraft type, followed by a short introduction about maintenance hangar. The second part of the paper presents a hangar design with a foldable roof and walls, which can be folded or extended, over an airplane when a maintenance process is done, or depending on weather condition.

  5. Maintenance Business Plans.

    Science.gov (United States)

    Adams, Matt

    2002-01-01

    Discusses maintenance business plans, statements which provide accountability for facilities maintenance organizations' considerable budgets. Discusses the plan's components: statement of plan objectives, macro and detailed description of the facility assets, maintenance function descriptions, description of key performance indicators, milestone…

  6. North American nuclear maintenance best practices compared to Japanese utility maintenance practices

    International Nuclear Information System (INIS)

    Harazim, M.L.; Ferguson, B.J.

    2003-01-01

    The purpose of this paper is to compare the best practices in North America concerning Preventive Maintenance, Predictive Maintenance and Reliability Centered Maintenance (RCM) or Preventive Maintenance Optimization (PMO) with the time-directed maintenance philosophies utilized by Japanese utilities, and how the Japanese utilities are considering (and some have begun) adopting North American ways of doing business. Preventive Maintenance Living Programs are also discussed, along with the Institute of Nuclear Power Operations AP-913 process, Equipment Reliability Process. Also, a cost benefit analysis will be demonstrated showing how major cost savings can be achieved by shifting from a predominantly time-directed maintenance philosophy to a predominantly predictive strategy utilizing vibration analysis, lubricating oil analysis, thermography and other predictive technologies to better utilize resources, reduce spare part consumption and to minimize maintenance induced errors. As a result of the strides made while incorporating these new philosophies, we no longer advocate tearing apart perfectly good equipment. (author)

  7. Optimization potential in maintenance; Optimierungspotenzial in der Instandhaltung

    Energy Technology Data Exchange (ETDEWEB)

    Janisch, H. [EnBW Kraftwerke AG, Kernkraftwerk Philippsburg (Germany)

    2001-04-01

    Also in the future, the supreme goal of nuclear power plant operation is going to be plant safety. At the same time, the economic component must be taken into account, which has become more important as a consequence of the deregulation in the electricity market. Until now, the electricity generating costs in nuclear power plants have been optimized by increases in electricity generation, and by high plant availabilities in terms of time and capacity. However, these capacity-based influences on the generating costs practically have been exploited to the full extent possible because of the high plant reliability reached. This makes the cost term the focal point in all optimization efforts, i.e. in existing nuclear power plants especially the maintenance costs. At the present high level of safety, which is going to develop even further, growing operating experience will allow a change to be made from preventive maintenance to cost-optimized state-oriented maintenance strategies. Other measures of advanced maintenance strategies are seen in the fields of work organization, personnel management, and personnel and plant use planning for more than one site. Important components in this effort are IT-based plant management systems allowing the complex problems to be planned, executed, controlled, and analyzed. All these measures serve to allow the operation of nuclear power plants at an even higher level of optimization, maximum safety in line with the state of the art, and demonstrably competitive electricity generating costs. (orig.) [German] Oberstes Ziel des Betriebs von Kernkraftwerken wird auch in Zukunft uneingeschraenkt deren Sicherheit sein, bei gleichzeitiger Beruecksichtigung der durch die Liberalisierung des Strommarktes bedeutungsvoller gewordenen wirtschaftlichen Komponente. Bislang wurden die Erzeugungskosten in Kernkraftwerken durch Erhoehung der Stromerzeugungsleistung und durch hohe Zeit- und Arbeitsverfuegbarkeiten optimiert. Auf Grund der erreichten

  8. A proactive condition-based maintenance strategy with both perfect and imperfect maintenance actions

    International Nuclear Information System (INIS)

    Do, Phuc; Voisin, Alexandre; Levrat, Eric; Iung, Benoit

    2015-01-01

    This paper deals with a proactive condition-based maintenance (CBM) considering both perfect and imperfect maintenance actions for a deteriorating system. Perfect maintenance actions restore completely the system to the ‘as good as new’ state. Their related cost are however often high. The first objective of the paper is to investigate the impacts of imperfect maintenance actions. In fact, both positive and negative impacts are considered. Positive impact means that the imperfect maintenance cost is usually low. Negative impact implies that (i) the imperfect maintenance restores a system to a state between good-as-new and bad-as-old and (ii) each imperfect preventive action may accelerate the speed of the system's deterioration process. The second objective of the paper is to propose an adaptive maintenance policy which can help to select optimally maintenance actions (perfect or imperfect actions), if needed, at each inspection time. Moreover, the time interval between two successive inspection points is determined according to a remaining useful life (RUL) based-inspection policy. To illustrate the use of the proposed maintenance policy, a numerical example finally is introduced. - Highlights: • A new imperfect maintenance model for deterioration system is proposed. • Both positive and negative impacts of an imperfect maintenance action are investigated. • An adaptive condition-based maintenance policy is introduced. • The optimal number of useful imperfect maintenance actions for each life cycle is optimally provided

  9. Competence within Maintenance

    OpenAIRE

    Nerland, Annette Smørholm

    2010-01-01

    Maintenance can be a contributing factor to unwanted events, as well as desired events and states. Human competence can be defined as the ability to perform a specific task, action or function successfully, and is therefore a key factor to proper execution of maintenance tasks. Hence,maintenance will have negative consequences if done wrong, and give positive results when done right. The purpose of this report is to study the many aspects of maintenance competence. Endeavoring to improve ...

  10. Random maintenance policies

    CERN Document Server

    Nakagawa, Toshio

    2014-01-01

    Exploring random maintenance models, this book provides an introduction to the implementation of random maintenance, and it is one of the first books to be written on this subject.  It aims to help readers learn new techniques for applying random policies to actual reliability models, and it provides new theoretical analyses of various models including classical replacement, preventive maintenance and inspection policies. These policies are applied to scheduling problems, backup policies of database systems, maintenance policies of cumulative damage models, and reliability of random redundant systems. Reliability theory is a major concern for engineers and managers, and in light of Japan’s recent earthquake, the reliability of large-scale systems has increased in importance. This also highlights the need for a new notion of maintenance and reliability theory, and how this can practically be applied to systems. Providing an essential guide for engineers and managers specializing in reliability maintenance a...

  11. Equipment Maintenance management support system based on statistical analysis of maintenance history data

    International Nuclear Information System (INIS)

    Shimizu, S.; Ando, Y.; Morioka, T.

    1990-01-01

    Plant maintenance is recently becoming important with the increase in the number of nuclear power stations and in plant operating time. Various kinds of requirements for plant maintenance, such as countermeasures for equipment degradation and saving maintenance costs while keeping up plant reliability and productivity, are proposed. For this purpose, plant maintenance programs should be improved based on equipment reliability estimated by field data. In order to meet these requirements, it is planned to develop an equipment maintenance management support system for nuclear power plants based on statistical analysis of equipment maintenance history data. The large difference between this proposed new method and current similar methods is to evaluate not only failure data but maintenance data, which includes normal termination data and some degree of degradation or functional disorder data for equipment and parts. So, it is possible to utilize these field data for improving maintenance schedules and to evaluate actual equipment and parts reliability under the current maintenance schedule. In the present paper, the authors show the objectives of this system, an outline of this system and its functions, and the basic technique for collecting and managing of maintenance history data on statistical analysis. It is shown, from the results of feasibility tests using simulation data of maintenance history, that this system has the ability to provide useful information for maintenance and the design enhancement

  12. Lean Maintenance Applied to Improve Maintenance Efficiency in Thermoelectric Power Plants

    OpenAIRE

    Orlando Duran; Andrea Capaldo; Paulo Andrés Duran Acevedo

    2017-01-01

    Thermoelectric power plants consist of a set of critical equipment that require high levels of availability and reliability. Due to this, maintenance of these physical assets is gaining momentum in industry. Maintenance is considered as an activity that contributes to improving the availability, efficiency and productivity of each piece of equipment. Several techniques have been used to achieve greater efficiencies in maintenance, among which we can find the lean maintenance philosophy. Despi...

  13. The Effort Paradox: Effort Is Both Costly and Valued.

    Science.gov (United States)

    Inzlicht, Michael; Shenhav, Amitai; Olivola, Christopher Y

    2018-04-01

    According to prominent models in cognitive psychology, neuroscience, and economics, effort (be it physical or mental) is costly: when given a choice, humans and non-human animals alike tend to avoid effort. Here, we suggest that the opposite is also true and review extensive evidence that effort can also add value. Not only can the same outcomes be more rewarding if we apply more (not less) effort, sometimes we select options precisely because they require effort. Given the increasing recognition of effort's role in motivation, cognitive control, and value-based decision-making, considering this neglected side of effort will not only improve formal computational models, but also provide clues about how to promote sustained mental effort across time. Copyright © 2018 Elsevier Ltd. All rights reserved.

  14. Using the system maintenance datastore to characterize lifetime maintenance for PLiM

    International Nuclear Information System (INIS)

    Watson, P.; Dam, R.; Nickerson, J.

    2004-01-01

    A comprehensive Plant Life Management (PLiM) program involves evaluating a large amount of information. For any plant, there are numerous maintenance, surveillance and inspection programs for the important systems, structures and components. There is extensive industry experience on component failure modes, degradation mechanisms and recommended maintenance practices. This information forms the basis of the aging assessment work, through which improvements to these plant programs are identified. AECL has developed several tools to manage the quantities of information required in aging assessment studies, such as the SYSTMS (SYtematic approach for the development of STrategy for Maintenance and Surveillance) tool and the System Maintenance Datastore (SMD). The SMD has been developed to serve as a hub to a Systematic based Adaptive Maintenance Program (SAMP), by storing maintenance resource requirements for recommended maintenance tasks for use by the other processes in a SAMP. The SMD can be used to (a) quantify the savings or cost of optimising a maintenance program, (b) characterize and understand long term trends in condition-based maintenance due to component aging, (c) quantify the resource savings due to optimum timing of component replacement or general plant refurbishment, and (d) provide aging assessment cost information for input to plant asset evaluation. The SMD contains data for regular maintenance program tasks, plant condition assessment recommendations, and equipment refurbishment costs. A prototype SMD has been developed with data tables populated with information from operating CANDU stations. The SMD is now available to be used either with a SYSTMS evaluation or with a plant's database of maintenance tasks. (author)

  15. Army Training: Efforts to Adjust Training Requirements Should Consider the Use of Virtual Training Devices

    Science.gov (United States)

    2016-08-01

    Needed to More Fully Assess Simulation-Based Efforts, GAO-13-698 (Washington, D.C.: Aug. 22, 2013). 5S . Rep. No. 114-49 and H. Rep. No. 114-102. Both...adapt to conditions, tactics, and even methods of conflict that may be impossible to accurately predict. Chemical, biological, radiological...all tasks required of drivers, such as dismounting during an operation to conduct maintenance on a vehicle

  16. Two Different Maintenance Strategies in the Hospital Environment: Preventive Maintenance for Older Technology Devices and Predictive Maintenance for Newer High-Tech Devices.

    Science.gov (United States)

    Sezdi, Mana

    2016-01-01

    A maintenance program generated through the consideration of characteristics and failures of medical equipment is an important component of technology management. However, older technology devices and newer high-tech devices cannot be efficiently managed using the same strategies because of their different characteristics. This study aimed to generate a maintenance program comprising two different strategies to increase the efficiency of device management: preventive maintenance for older technology devices and predictive maintenance for newer high-tech devices. For preventive maintenance development, 589 older technology devices were subjected to performance verification and safety testing (PVST). For predictive maintenance development, the manufacturers' recommendations were used for 134 high-tech devices. These strategies were evaluated in terms of device reliability. This study recommends the use of two different maintenance strategies for old and new devices at hospitals in developing countries. Thus, older technology devices that applied only corrective maintenance will be included in maintenance like high-tech devices.

  17. Maintenance Personnel Performance Simulation (MAPPS) model: description of model content, structure, and sensitivity testing. Volume 2

    International Nuclear Information System (INIS)

    Siegel, A.I.; Bartter, W.D.; Wolf, J.J.; Knee, H.E.

    1984-12-01

    This volume of NUREG/CR-3626 presents details of the content, structure, and sensitivity testing of the Maintenance Personnel Performance Simulation (MAPPS) model that was described in summary in volume one of this report. The MAPPS model is a generalized stochastic computer simulation model developed to simulate the performance of maintenance personnel in nuclear power plants. The MAPPS model considers workplace, maintenance technician, motivation, human factors, and task oriented variables to yield predictive information about the effects of these variables on successful maintenance task performance. All major model variables are discussed in detail and their implementation and interactive effects are outlined. The model was examined for disqualifying defects from a number of viewpoints, including sensitivity testing. This examination led to the identification of some minor recalibration efforts which were carried out. These positive results indicate that MAPPS is ready for initial and controlled applications which are in conformity with its purposes

  18. Aesthetic possibilities in removable prosthodontics. Part 1: the aesthetic spectrum from perfect to personal.

    Science.gov (United States)

    Besford, J N; Sutton, A F

    2018-01-12

    Patients requiring dentures are getting older and as a result can be difficult to treat owing to various co-morbidities. This series of papers presents an overview of the processes involved in making removable dentures which the patient considers to be functionally and aesthetically successful. We hope not only to provide technical suggestions but also to address the issue of the clinician's, technician's and dental nurse's relationships with the dentally depleted patient. It is increasingly clear from defence organisation reports that this has a decisive effect on the success of this fundamentally difficult enterprise ('The only branch of dentistry in which you are trying to attach something to nothing' [Hubert Aïche]). It seems best to conduct the planning and the treatment itself as a co-production - the patient assuming responsibility for choosing between the treatment options offered and playing the leading role in making aesthetic decisions. Distinctions are drawn between the idealised whiter-than-white, 'nobody-in-particular', attention-seeking denture at one extreme, and the highly personalised, discreet and naturalistic denture at the other. Reproducing nature in this way is time consuming and therefore expensive, but many 'denture sufferers' see it as good value. Methods for creating the latter, which through its very normality switches off the social observer's attention, are explained in detail in papers two and three of this series. These papers are designed to help clinicians and technicians involved in providing removable prosthodontics improve the appearance of their dentures and increase their patients' aesthetic satisfaction. They are not scientific articles in the Popperian sense of advancing theories which are capable of being falsified. Instead, they are an amalgamation of 72 years of combined experience in providing removable dental prostheses. We have found this branch of dentistry immensely interesting and have on many occasions had the

  19. Status and trends in the development of Total Productive Maintenance (TPM) - a review of international articles

    DEFF Research Database (Denmark)

    Andreassen, Mads; Gertsen, Frank; Christiansen, Thomas Bøhm

    2004-01-01

    Corporate continuous innovation efforts are often guided by (more or less) customized standard management concepts such as "TQM", "BPR" or "Lean". The focus of this article, Total Productive Maintenance (TPM), is a contemporary example of such a concept. Although the concept first appeared more...... maintenance and high efficiency of the production facilities. However, during the last ten years, the concepthas been developed into a company wide (management)concept, also compromising efficiency in the administrative part of a company, safety and environmental aspects, as well as product quality. Based...

  20. Integrated maintenance program (IMP)

    International Nuclear Information System (INIS)

    Zemdegs, R.T.; Chout, Q.B.

    1998-01-01

    Approaches to the maintenance of nuclear power plants have undergone significant change in the past several decades. The traditional breakdown approach has been displaced by preventive (calendar-based) maintenance and more recently, by condition-based maintenance (CBM). This is largely driven by the fact that traditional maintenance programs, derived primarily from equipment vendor recommendations, are generally unsuccessful in controlling maintenance costs or equipment failures. Many advances in the maintenance field have taken place since the maintenance plans for Ontario Hydro's nuclear plants were initially established. Ontario Hydro nuclear plant operating costs can be substantially reduced and Incapability Factor improved with the application of modern maintenance processes and tools. Pickering is designated as the lead station for IMP. Of immediate concern is the fact that Pickering Nuclear Division has been experiencing a significant backlog of Operating Preventive Maintenance Callups. This backlog, over 2000, is unacceptable to both station management and the nuclear regulator, the Atomic Energy Control Board. In addition there are over 500 callups in various stages of revision (in hyperspace) without an adequate control nor reporting system to manage their completion. There is also considerable confusion about the classification of l icensing c allups, e.g. callups which are mandatory as a result of legal requirements. Furthermore the ineffectiveness of the Preventive Maintenance (PM) has been the subject of peer audits and Atomic Energy Control Board (AECB) findings over the past several years. The current preventive maintenance ratio PM2 /(PM+CM3) at Pickering ND is less than 20%, due to the current high load of equipment breakdown. This past summer, an Independent Integrated Performance Assessment (IIPA) review at Ontario Hydro confirmed these concerns. Over the past several years, Ontario Hydro nuclear staff have evaluated several programs to improve

  1. Maintenance work management system

    International Nuclear Information System (INIS)

    Kanai, T.; Takahashi, Y.; Takahashi, K.; Nishino, M.; Takeshige, R.

    2000-01-01

    The maintenance work management system supports the efficient drawing up of various documents for the maintenance work at nuclear power stations and the speeding up of the permission procedure. In addition, it improves the quality assurance of the safety and reliability of the maintenance work. Key merits of the system are: 1. Efficiently drawing up various documents for the maintenance work by using the stored data for the previous maintenance work and the pipe and instrument diagram (P and ID) data. 2. Supporting the management work for the completion of maintenance work safety by using the isolation information stored on the computer system. 3. Speeding up the permission procedure by electronic mail and electronic permission. 4. Displaying additional information such as the specifications of equipment, maintenance result, and maintenance plan by linking up with the database of another system. 5. Reducing the cost of hardware devices by using client/server network configurations of personal computers and a personal computer server. (author)

  2. Maintenance Production Demand and Capacity Analysis of Third Maintenance Battalion

    Science.gov (United States)

    2017-12-01

    Delivery T/E Table of Equipment TFSMS Total Force Structure Management System TFSP Total Force Structure Process TM Technical Manual T/O Table of...exercises each year, both on Okinawa and throughout the Pacific theater. When equipment requires maintenance beyond the organizational -level...demand was analyzed based on customer cycle time (i.e., time that equipment was in Third Maintenance Battalion custody), maintenance cycle time during

  3. Grounds Maintenance Equipment and Procedures. Building Maintenance. Module VI. Instructor's Guide.

    Science.gov (United States)

    Crank, Virgil

    This curriculum guide, one of six modules keyed to the building maintenance competency profile developed by industry and education professionals, provides materials for two units on grounds maintenance equipment and procedures. The first unit deals with grounds maintenance equipment and includes the following lessons: safety; changing oil/filter…

  4. Extended great deluge algorithm for the imperfect preventive maintenance optimization of multi-state systems

    International Nuclear Information System (INIS)

    Nahas, Nabil; Khatab, Abdelhakim; Ait-Kadi, Daoud; Nourelfath, Mustapha

    2008-01-01

    This paper deals with preventive maintenance optimization problem for multi-state systems (MSS). This problem was initially addressed and solved by Levitin and Lisnianski [Optimization of imperfect preventive maintenance for multi-state systems. Reliab Eng Syst Saf 2000;67:193-203]. It consists on finding an optimal sequence of maintenance actions which minimizes maintenance cost while providing the desired system reliability level. This paper proposes an approach which improves the results obtained by genetic algorithm (GENITOR) in Levitin and Lisnianski [Optimization of imperfect preventive maintenance for multi-state systems. Reliab Eng Syst Saf 2000;67:193-203]. The considered MSS have a range of performance levels and their reliability is defined to be the ability to meet a given demand. This reliability is evaluated by using the universal generating function technique. An optimization method based on the extended great deluge algorithm is proposed. This method has the advantage over other methods to be simple and requires less effort for its implementation. The developed algorithm is compared to than in Levitin and Lisnianski [Optimization of imperfect preventive maintenance for multi-state systems. Reliab Eng Syst Saf 2000;67:193-203] by using a reference example and two newly generated examples. This comparison shows that the extended great deluge gives the best solutions (i.e. those with minimal costs) for 8 instances among 10

  5. Site Maintenance Plan: Part 2, Site Maintenance Action Plan for FY 1994

    Energy Technology Data Exchange (ETDEWEB)

    Fisk, E.L.

    1994-06-01

    This Fiscal Year (FY) 1994 Site Maintenance Action Plan (SMAP) is Part II of the Site Maintenance Plan, and has been written by Westinghouse Hanford Company (WHC) to outline the requirements stated in DOE Order 4330.4B, Maintenance Management Program, Chapter 1, Paragraph 3.3.1. The SMAP provides an annual status of maintenance initiatives completed and planned, a summary of performance indicators, a summary of maintenance backlog, a listing of real property and capital equipment maintenance cost estimates that were used to create the FY 1996 infrastructure and maintenance budget input, and a listing of proposed line item and general plant projects. Additionally, assumptions for various Site programs are listed to bring the Site Maintenance Plan into focus with overall Site activities. The primary mission at Hanford is to clean up the Site. In this cleanup process WHC will provide scientific and technological expertise to meet global needs, and partnership with stakeholders in the region to develop regional economic diversification. Other missions at the Hanford Site include energy research and development, and waste management and disposal activities. Their primary mission has a 30-year projected life span and will direct the shutting down and cleanup of defense production facilities and the Fast Flux Test Facility. This long-term mission requires continuous maintenance and in many instances, replacement of existing basic infrastructure, support facilities, and utilities. Without adequate maintenance and capital funding these infrastructure, support facilities, and utilities will continue to deteriorate causing an increase in backlogged work.

  6. Site Maintenance Plan: Part 2, Site Maintenance Action Plan for FY 1994

    International Nuclear Information System (INIS)

    Fisk, E.L.

    1994-06-01

    This Fiscal Year (FY) 1994 Site Maintenance Action Plan (SMAP) is Part II of the Site Maintenance Plan, and has been written by Westinghouse Hanford Company (WHC) to outline the requirements stated in DOE Order 4330.4B, Maintenance Management Program, Chapter 1, Paragraph 3.3.1. The SMAP provides an annual status of maintenance initiatives completed and planned, a summary of performance indicators, a summary of maintenance backlog, a listing of real property and capital equipment maintenance cost estimates that were used to create the FY 1996 infrastructure and maintenance budget input, and a listing of proposed line item and general plant projects. Additionally, assumptions for various Site programs are listed to bring the Site Maintenance Plan into focus with overall Site activities. The primary mission at Hanford is to clean up the Site. In this cleanup process WHC will provide scientific and technological expertise to meet global needs, and partnership with stakeholders in the region to develop regional economic diversification. Other missions at the Hanford Site include energy research and development, and waste management and disposal activities. Their primary mission has a 30-year projected life span and will direct the shutting down and cleanup of defense production facilities and the Fast Flux Test Facility. This long-term mission requires continuous maintenance and in many instances, replacement of existing basic infrastructure, support facilities, and utilities. Without adequate maintenance and capital funding these infrastructure, support facilities, and utilities will continue to deteriorate causing an increase in backlogged work

  7. The maintenance training center of the paks nuclear power plant - past, present and future

    International Nuclear Information System (INIS)

    Kiss, I.

    2001-01-01

    The safety of the Paks nuclear power plant (Paks NPP) is a political-economic factor with general influence on the stability of the Hungarian economy. Since the beginning of the 1990s, the plant management has been taking significant efforts to learn about the factors that define plant safety and to reveal areas where safety can be further improved. Major emphasis is also placed on the provision of resources and creation of conditions necessary for the preservation of staff competence. In 1997 a separate, maintenance-specific facility was erected. The Maintenance Training Center of the Paks NPP is a worldwide major unique center. (orig.) [de

  8. Building relationships for better maintenance.

    Science.gov (United States)

    Lee, Hackman Hon Yin; Scott, David

    2009-02-01

    Effective management of building maintenance is a vital ingredient in ensuring a high quality built environment for any building's occupiers. However, maintenance is not high on the list of priorities for most organisations. Communication between top management personnel looking at maintenance issues from a strategic standpoint and maintenance staff considering them at an operational level is often not as good as it should be. When planning maintenance activities maintenance personnel often draw too heavily on their technical experience and expertise without taking sufficient account of wider organisational objectives or consulting effectively with top management. Senior managers also regularly complain about lack of managerial input from maintenance departments. Such barriers contribute to communication difficulties between top management at a strategic level and maintenance personnel at an operational level. Identifying where the key differences lie in senior managers' and maintenance personnel's viewpoints on maintenance strategy can prove invaluable in achieving some convergence of opinions and optimising the efficiency of the overall building maintenance process.

  9. COMPETITIVE INTELLIGENCE AT BRAZILIAN INDUSTRIAL MAINTENANCE DEPARTMENTS

    Directory of Open Access Journals (Sweden)

    Robson Quinello

    2006-11-01

    Full Text Available The industrial maintenance activities, generally, were considered as more one problem to the organizations. This image needs to change in Brazil , because this sector is part of the companies supply chain, is responsible to maintain equipments reliability and availability and it is a generator of the companies costs. This responsibility increases in a country where the productive capacity is in the limit, demanding extra efforts and where increasing pressures for reductions of the costs and restrictions techniques and human beings are increasing, ask to paradigms changes. The present study had for purpose to identify main canals of captation of the information used by the Brazilian industrial maintenance professionals, demonstrating systematic use of Competitive Intelligence can bring technological advance and profit of competitive advantage. For this, a qualitative research was made, using as research instruments the Delphi method, interviews with professionals and an experimental delineation C.I- Competitive Intelligence in a department-pilot (automotive sector.The results had shown to the use of formal and informal sources in different frequencies of access and the fragility in these departments in the not-systematic use of C.I, harming the above-mentioned challenges.

  10. Remote maintenance considerations for swimming pool tokamak reactor

    International Nuclear Information System (INIS)

    Niikura, S.; Yamada, M.; Kasai, M.

    1983-01-01

    Swimming Pool Tokamak Reactor (SPTR) is one of the candidate devices which are expected to demonstrate physical and engineering feasibility for fusion power reactors. In SPTR, water shield is adopted instead of solid shield structures. Among the advantages of SPTR are, from viewpoint of remote maintenance, small handling weight and high space availability between TF coils and a vacuum vessel. On the other hand, high dose rate during reactor repair and adverse effects on remote maintenance equipment by the shielding water might be the disadvantage of SPTR, where it is assumed that the shielding water is drained during reactor repair. Since the design of SPTR is still at the preliminary stage, for remote maintenance, much effort has been directed to clarification of design conditions such as environment and handling weight. As for the remote maintenance system concepts, studies have been focussed on those for a vacuum vessel and its internal structure (blanket, divertor and protection walls) expected to be repaired more frequently. The vacuum vessel assembly is divided into 21 sectors and number of TF coils is 14. A pair of TF coils are connected with each other by antitorque beams on the whole side surface. Vacuum vessel cassettes and associated blanket, divertor and protection walls are replaced through seven windows between TF coils pairs. Therefore each vacuum vessel cassette is required moving mechanisms in toroidal and radial directions. Options for slide mechanisms are wheels, balls, rollers and water bearings. Options for driving the cassette are self-driving by hydraulic motors and external driving by rack-pinion, wires or specific vehicles. As a result of studies, the moving mechanism with wheels and hydraulic motors has been selected for the reference design, and the system with water bearings and rack-pinion as an alternative. Furthermore typical concepts have been obtained for remote maintenance equipment such as wall-mounted manipulators, tools for

  11. Modern electronic maintenance principles

    CERN Document Server

    Garland, DJ

    2013-01-01

    Modern Electronic Maintenance Principles reviews the principles of maintaining modern, complex electronic equipment, with emphasis on preventive and corrective maintenance. Unfamiliar subjects such as the half-split method of fault location, functional diagrams, and fault finding guides are explained. This book consists of 12 chapters and begins by stressing the need for maintenance principles and discussing the problem of complexity as well as the requirements for a maintenance technician. The next chapter deals with the connection between reliability and maintenance and defines the terms fai

  12. Predicting maintenance of attendance at walking groups: testing constructs from three leading maintenance theories.

    Science.gov (United States)

    Kassavou, Aikaterini; Turner, Andrew; Hamborg, Thomas; French, David P

    2014-07-01

    Little is known about the processes and factors that account for maintenance, with several theories existing that have not been subject to many empirical tests. The aim of this study was to test how well theoretical constructs derived from the Health Action Process Approach, Rothman's theory of maintenance, and Verplanken's approach to habitual behavior predicted maintenance of attendance at walking groups. 114 participants, who had already attended walking groups in the community for at least 3 months, completed a questionnaire assessing theoretical constructs regarding maintenance. An objective assessment of attendance over the subsequent 3 months was gained. Multilevel modeling was used to predict maintenance, controlling for clustering within walking groups. Recovery self-efficacy predicted maintenance, even after accounting for clustering. Satisfaction with social outcomes, satisfaction with health outcomes, and overall satisfaction predicted maintenance, but only satisfaction with health outcomes significantly predicted maintenance after accounting for clustering. Self-reported habitual behavior did not predict maintenance despite mean previous attendance being 20.7 months. Recovery self-efficacy, and satisfaction with health outcomes of walking group attendance appeared to be important for objectively measured maintenance, whereas self-reported habit appeared not to be important for maintenance at walking groups. The findings suggest that there is a need for intervention studies to boost recovery self-efficacy and satisfaction with outcomes of walking group attendance, to assess impact on maintenance.

  13. Four Generations of Maintenance Resource Management Programs in the United States: An Analysis of the Past, Present, and Future

    Science.gov (United States)

    Taylor, James C.; Patankar, Manoj S.

    2001-01-01

    This paper analyzes four generations of Maintenance Resource Management (MRM) programs implemented by aviation maintenance organizations in the United States. Data collected from over ten years of survey research and field observations are used for this analysis; they are presented in a case-study format. The first three generations of MRM programs were episodic efforts to increase safety through teamwork, focus group discussions, and awareness courses, respectively. Now, the fourth generation programs, characterized by a commitment to long-term communication and behavioral changes in maintenance, are set to build on those earlier generations, toward a culture of mutual trust between mechanics, their managers, and regulators.

  14. Condition based maintenance in the context of opportunistic maintenance

    NARCIS (Netherlands)

    Koochaki, Javid; Bokhorst, Jos A. C.; Wortmann, Hans; Klingenberg, Warse

    2012-01-01

    Condition based maintenance (CBM) uses the operating condition of a component to predict a failure event. Compared to age based replacement (ABR), CBM usually results in higher availability and lower maintenance costs, since it tries to prevent unplanned downtime and avoid unnecessary preventive

  15. EPR design for maintenance

    International Nuclear Information System (INIS)

    Krugmann, U.

    1998-01-01

    Preventive maintenance is very important in achieving high plant availability. For the European Pressurized Reactor (EPR) preventive maintenance has been carefully addressed in the design stage. This is particularly necessary because of the traditionally different maintenance strategies employed in France and Germany. This paper emphasizes the following features introduced in the ERP design to minimize the duration of the refueling outage: (1) containment accessibility during power operation; (2) overall plant layout to facilitate inspections and maintenances within the containment; and (3) safety system design for enabling preventive maintenance during power operation. (author)

  16. Predictive maintenance primer

    International Nuclear Information System (INIS)

    Flude, J.W.; Nicholas, J.R.

    1991-04-01

    This Predictive Maintenance Primer provides utility plant personnel with a single-source reference to predictive maintenance analysis methods and technologies used successfully by utilities and other industries. It is intended to be a ready reference to personnel considering starting, expanding or improving a predictive maintenance program. This Primer includes a discussion of various analysis methods and how they overlap and interrelate. Additionally, eighteen predictive maintenance technologies are discussed in sufficient detail for the user to evaluate the potential of each technology for specific applications. This document is designed to allow inclusion of additional technologies in the future. To gather the information necessary to create this initial Primer the Nuclear Maintenance Applications Center (NMAC) collected experience data from eighteen utilities plus other industry and government sources. NMAC also contacted equipment manufacturers for information pertaining to equipment utilization, maintenance, and technical specifications. The Primer includes a discussion of six methods used by analysts to study predictive maintenance data. These are: trend analysis; pattern recognition; correlation; test against limits or ranges; relative comparison data; and statistical process analysis. Following the analysis methods discussions are detailed descriptions for eighteen technologies analysts have found useful for predictive maintenance programs at power plants and other industrial facilities. Each technology subchapter has a description of the operating principles involved in the technology, a listing of plant equipment where the technology can be applied, and a general description of the monitoring equipment. Additionally, these descriptions include a discussion of results obtained from actual equipment users and preferred analysis techniques to be used on data obtained from the technology. 5 refs., 30 figs

  17. Preventative Maintenance.

    Science.gov (United States)

    Migliorino, James

    Boards of education must be convinced that spending money up front for preventive maintenance will, in the long run, save districts' tax dollars. A good program of preventive maintenance can minimize disruption of service; reduce repair costs, energy consumption, and overtime; improve labor productivity and system equipment reliability; handle…

  18. Second Line of Defense: Electronic Maintenance Reports, Local Maintenance Provider User Guide, Rev. 3

    Energy Technology Data Exchange (ETDEWEB)

    Leigh, Richard J.

    2012-09-01

    The Electronic Maintenance Report forms allow Local Maintenance Providers (LMP) and other program staff to enter maintenance information into a simple and secure system. This document describes the features and information required to complete the Maintenance Report forms. It is expected that all Corrective Maintenance Reports from LMPs will be submitted electronically into the SLD Portal. As an exception (e.g., when access to the SLD Portal is unavailable), Maintenance Reports can be submitted via a secure Adobe PDF form available through the Sustainability Manager assigned to each country.

  19. Guide for monitoring effectiveness of utility Reliability Centered Maintenance (RCM) programs

    International Nuclear Information System (INIS)

    Midgett, W.D.; Wilson, J.F.; Krochmal, D.F.; Owsenek, L.W.

    1991-02-01

    Reliability centered maintenance (RCM) programs help utilities optimize preventive maintenance efforts while improving plant safety and economy through increased dependability of plant components. The project team developed this guide and accompanying methodology based on status updates from the Ginna and San Onofre demonstration projects. These updates addressed areas ranging from system selection to the effectiveness of RCM program implementation. In addition, the team incorporated information from a 12-utility survey soliciting opinions on the need for a methodology to monitor RCM cost-effectiveness. An analysis of the 12-utility survey showed that no techniques had been developed to measure RCM program cost-effectiveness. Thus, this guide addresses two key areas: Pros and cons of various monitoring techniques available to assess the overall effectiveness of RCM and a methodology for specifically evaluating the cost-effectiveness of RCM programs. 1 fig

  20. The European contribution to the ITER Remote Maintenance

    Energy Technology Data Exchange (ETDEWEB)

    Damiani, C., E-mail: carlo.damiani@f4e.europa.eu [Fusion for Energy, Torres Diagonal Litoral B3, Josep Pla 2, 08019 Barcelona (Spain); Annino, C.; Balagué, S.; Bates, P.; Ceccanti, F.; Di Mascio, T.; Dubus, G.; Esqué, S.; Gonzalez, C.; Lewczanin, M.; Locke, D.; Mont, L.; Olajos, K.; Ranz, R.; Shuff, R.; Puiu, A.; Van Hille, C.; Van Uffelen, M. [Fusion for Energy, Torres Diagonal Litoral B3, Josep Pla 2, 08019 Barcelona (Spain); Choi, C.H.; Friconneau, J.P. [ITER Organization, Route de Vinon sur Verdon, 13115 Saint Paul Lez Durance (France); and others

    2014-10-15

    Highlights: •The article introduces the needs for remote maintenance in ITER. •It also discusses some of the issues related to the cultural transition from tokamaks as plasma physics to nuclear reactors. •It highlights the related cultural change and the implications on plant topology and maintenance. •Then, it presents those remote handling systems that will be procured by Europe. •The article emphasises the need of a major involvement of industries from now on. -- Abstract: For a first-of-a-kind nuclear fusion reactor like ITER, remote maintainability of neutron-activated components is one of the key aspects of plant design and operations, and a fundamental ingredient for the demonstration of long-term viability of fusion as energy source. The European Domestic Agency (EU DA, i.e. Fusion for Energy, F4E) is providing important support to the ITER Organisation (IO) in specifying the functional requirements of the Remote Handling (RH) Procurement Packages (i.e. the subsystems allocated to EU DA belonging to the overall ITER Remote Maintenance Systems IRMS), and in performing design and R and D activities – with the support of national laboratories and industries – in order to define a sound concept for these packages. Furthermore, domestic industries are being involved in the subsequent detailed design, validation, manufacturing and installation activities, in order to actually fulfil our procurement-in-kind obligations. After an introduction to ITER Remote Maintenance, this paper will present status and next stages for the RH systems allocated to EU DA, and will also illustrate complementary aspects related to cross cutting technologies like radiation tolerant components and RH control systems. Finally, the way all these efforts are coordinated will be presented together with the overall implementation scenario and key milestones.

  1. Framework for Maintenance Planning

    DEFF Research Database (Denmark)

    Soares, C. Guedes; Duarte, J. Caldeira; Garbatov, Y.

    2010-01-01

    the design and during the whole life span of operational use, within an integrated framework founded on risk and reliability based techniques. The document addresses designers, decision makers and professionals responsible for or involved in establishing maintenance plans. The purpose of this document......The present document presents a framework for maintenance planning. Maintenance plays a fundamental role in counteracting degradation effects, which are present in all infrastructure and industrial products. Therefore, maintenance planning is a very critical aspect to consider both during...... is to present maintenance as an integrated approach that needs to be planned, designed, engineered, and controlled by proper qualitative and quantitative techniques. This document outlines the basic premises for maintenance planning and provides the general philosophies that can be followed and points to a best...

  2. Overview of maintenance principles and regulatory supervision of maintenance activities at nuclear power plants in Slovakia

    International Nuclear Information System (INIS)

    Rohar, S.; Cepcek, S.

    1997-01-01

    The maintenance represents one of the most important tools to ensure safe and reliable operation of nuclear power plants. The emphasis of Nuclear Regulatory Authority of the Slovak Republic to the maintenance issue is expressed by requirements in the regulations. The current practice of maintenance management in operated nuclear power plants in Slovak Republic is presented. Main aspects of maintenance, as maintenance programme, organization of maintenance, responsibilities for maintenance are described. Activities of nuclear regulatory authority in maintenance process are presented too. (author)

  3. Maintenance of nuclear power plants

    International Nuclear Information System (INIS)

    1982-01-01

    This Guide covers the organizational and procedural aspects of maintenance but does not give detailed technical advice on the maintenance of particular plant items. It gives guidance on preventive and remedial measures necessary to ensure that all structures, systems and components important to safety are capable of performing as intended. The Guide covers the organizational and administrative requirements for establishing and implementing preventive maintenance schedules, repairing defective plant items, providing maintenance facilities and equipment, procuring stores and spare parts, selecting and training maintenance personnel, reviewing and controlling plant modifications arising from maintenance, and for generating, collecting and retaining maintenance records. Maintenance shall be subject to quality assurance in all aspects important to safety. Because quality assurance has been dealt with in detail in other Safety Guides, it is only included here in specific instances where emphasis is required. Maintenance is considered to include functional and performance testing of plant, surveillance and in-service inspection, where these are necessary either to support other maintenance activities or to ensure continuing capability of structures, systems and components important to safety to perform their intended functions

  4. Establishing a predictive maintenance (PdM) program at the Hanford Site

    International Nuclear Information System (INIS)

    Murray, W.A.; Winslow, R.G.

    1994-02-01

    The production reactors have been shut down for some time. But for the rest of the site, there is currently about 16,000 people engaged in a multi-billion dollar effort to safely process wastes which have been stored at the site since the 1940's. This effort also includes demolition of some older facilities and environmental restoration of much of the site. This is expected to take approximately 30 to 40 years. The concept of a site-wide predictive maintenance (PdM) program began to form in early 1993. Several informal studies showed that the stand alone predictive maintenance groups which had prevailed on site to date were less than 15% effective at trending equipment conditions and predicting failures. To improve the effectiveness of PdM within the company, an engineering analysis by Rick Winslow confirmed that utilization of software networking technology which was now available would significantly overcome many of these built in handicaps. A site-wide predictive maintenance network would make PdM technology accessible to all of the areas and facilities at the site regardless of geographical distances and company division lines. Site resident vibration experts can easily be located and provide consultations on the network. However, it was recognized that strong leadership and management skills would be required within each of the two organizations for effective implementation. To start this process, a letter of understanding and agreement between the facilities and Tank Farm divisions was drafted and endorsed by company management. The agreement assigned the primary responsibility of acquiring the network software and licensee to the Tank Farms division. The acquisition and installation of the network server would be the responsibility of the facilities division. This paper describes the rest of the network development and implementation process

  5. The cost of reproduction in women: Reproductive effort and oxidative stress in premenopausal and postmenopausal American women.

    Science.gov (United States)

    Ziomkiewicz, Anna; Frumkin, Amara; Zhang, Yawei; Sancilio, Amelia; Bribiescas, Richard G

    2018-01-01

    Life history theory predicts a trade-off between female investment in reproduction and somatic maintenance, which can result in accelerated senescence. Oxidative stress has been shown to be a causal physiological mechanism for accelerated aging and a possible contributor to this trade-off. We aimed to test the hypothesis for the existence of significant associations between measures of reproductive effort and the level of oxidative stress biomarkers in premenopausal and postmenopausal American women. Serum samples and questionnaire data were collected from 63 premenopausal and postmenopausal women (mean age 53.4 years), controls in the Connecticut Thyroid Health Study, between May 2010 and December 2013. Samples were analyzed for levels of 8-OHdG and Cu/Zn-SOD using immunoassay method. Levels of oxidative damage (8-OHdG) but not oxidative defense (Cu/Zn-SOD) were negatively associated with parity and number of sons in premenopausal women (r = -0.52 for parity, r = -0.52 for number of sons, P reproductive effort, women's BMI, age, and menopausal status explained around 15% of variance in level of 8-OHdG. No association between reproductive effort characteristics and oxidative damage was found for postmenopausal women. We found no evidence of a trade-off between somatic maintenance as measured by 8-OHdG and reproductive effort in women from this American population. On the contrary, higher gravidity and parity in premenopausal women was associated with lower damage to cellular DNA caused by oxidative stress. These results highlight the importance of population variation and environmental conditions when testing the occurrence of life-history trade-offs. © 2017 Wiley Periodicals, Inc.

  6. Functional benefits of implants placed during ablative surgery: A 5-year prospective study on the prosthodontic rehabilitation of 56 edentulous oral cancer patients.

    Science.gov (United States)

    Wetzels, Jan Willem; Koole, Ron; Meijer, Gert J; de Haan, Anton F J; Merkx, Matthias A W; Speksnijder, Caroline M

    2016-04-01

    The timing of placement as well as the functional benefit of interforaminal implants in edentulous patients treated for oral cancer is unclear. Fifty-six patients were recruited at 2 institutions. In 1 institution, interforaminal implants were placed during ablative surgery, the other institution used conventional prosthodontics with optional placement of implants postsurgery (postponed-placement). Masticatory performance, bite force, and subjective masticatory function were assessed before and 6 months, 1 year, and 5 years after surgery. Implant-retained overdentures (IODs) demonstrated the highest bite force and the least problems with solid food and food choice. Masticatory performance was equal for IODs and conventional dentures. After 5 years, IODs from patients in the during-ablative-surgery cohort tend to have higher bite force and masticatory performance than those from patients in the postponed-placement cohort. IODs produce the highest overall masticatory function. Implant placement during ablative surgery seems to be functionally beneficial. © 2016 Wiley Periodicals, Inc. Head Neck 38: E2103-E2111, 2016. © 2016 Wiley Periodicals, Inc.

  7. Paranal maintenance and CMMS experience

    Science.gov (United States)

    Montano, Nelson

    2004-10-01

    During the last four years of operations, low technical downtime has been one of the relevant records of the Paranal Observatory. From the beginning of the Very Large Telescope (VLT) project, European Southern Observatory (ESO) has considered the implementation of a proper maintenance strategy a fundamental point in order to ensure low technical down time and preserve the Observatory's assets. The implementation of the maintenance strategy was based on the following aspects: - Strong maintenance sense during the design stage. Line Replacement Unit (LRU) concept, standardization and modularity of the Observatory equipment - Creation of a dedicated team for Maintenance - The implementation of a Computerized Maintenance Management System After four operational years, the result of these aspects has exceeded the expectations; the Observatory has been operating with high availability under a sustainable strategy. The strengths of the maintenance strategy have been based on modern maintenance concepts applied by regular production companies, where any minute of down time involves high cost. The operation of the actual Paranal Maintenance System is based mainly on proactive activities, such as regular inspections, preventive maintenance (PM) and predictive maintenance (PdM) plans. Nevertheless, it has been necessary to implement a strong plan for corrective maintenance (CM). The Spare Parts Strategy has also been an important point linked to the Maintenance Strategy and CMMS implementation. At present, almost 4,000 items related to the Observatory spare parts are loaded into the CMMS database. Currently, we are studying the implementation of a Reliability Centered Maintenance (RCM) project in one of our critical systems The following document presents the actual status of the Paranal Maintenance Strategy and which have been the motivations to implement the established strategy.

  8. Public Tourism Infrastructure: Challenges in the Development and Maintenance Activities

    Directory of Open Access Journals (Sweden)

    Abdullah Shardy

    2014-01-01

    Full Text Available In Malaysia, the tourism sector is a major contributor to the nation’s development and is spearheaded by the government’s efforts in investing heavily towards providing sufficient and well-functioning public tourism infrastructure. This infrastructure should be ideally developed with a clear and systematic maintenance plan in hand. The challenge herein is not merely providing the necessary infrastructure to sustain tourism activities but rather a pro-active approach towards establishing and subsequently maintaining this infrastructure at its optimal level. The aim of this paper therefore is to identify critical aspects that need to be in place to further enhance the Malaysian tourism industry. The paper discusses the issues and challenges that need to be addressed as a precursor towards an effectively developed and maintained tourism infrastructure system. Development issues that have been identified revolve around the dimensions of quality, quantity and ability of the public agencies involved, particularly issues of inadequate infrastructure, quality of infrastructure and the capability of the agencies in undertaking efficient maintenance activities. These issues were found to lead towards challenges of working with resource constraints, lack of an effective maintenance culture and system as well as the need for clear and effective policies and strategies.

  9. Data management in maintenance outsourcing

    International Nuclear Information System (INIS)

    Murthy, D.N.P.; Karim, M.R.; Ahmadi, A.

    2015-01-01

    Most businesses view maintenance as tasks carried out by technicians and the data collected is mostly cost related. There is a growing trend towards outsourcing of maintenance and the data collection issues are not addressed properly in most maintenance service contracts. Effective maintenance management requires proper data management - data collection and analysis for decision-making. This requires a proper framework and when maintenance is outsourced it raises several issues and challenges. The paper develops a framework for data management when maintenance is outsourced and looks at a real case study that highlights the need for proper data management. - Highlights: • Framework for data management in maintenance outsourcing. • Black-box to grey-box approaches for modelling. • Improvements to maintenance decision-making. • Case study to illustrate the approaches and the shortcomings in data collection

  10. Magellanic penguin telomeres do not shorten with age with increased reproductive effort, investment, and basal corticosterone.

    Science.gov (United States)

    Cerchiara, Jack A; Risques, Rosa Ana; Prunkard, Donna; Smith, Jeffrey R; Kane, Olivia J; Boersma, P Dee

    2017-08-01

    All species should invest in systems that enhance longevity; however, a fundamental adult life-history trade-off exists between the metabolic resources allocated to maintenance and those allocated to reproduction. Long-lived species will invest more in reproduction than in somatic maintenance as they age. We investigated this trade-off by analyzing correlations among telomere length, reproductive effort and output, and basal corticosterone in Magellanic penguins ( Spheniscus magellanicus ). Telomeres shorten with age in most species studied to date, and may affect adult survival. High basal corticosterone is indicative of stressful conditions. Corticosterone, and stress, has been linked to telomere shortening in other species. Magellanic penguins are a particularly good model organism for this question as they are an unusually long-lived species, exceeding their mass-adjusted predicted lifespan by 26%. Contrary to our hypothesis, we found adults aged 5 years to over 24 years of age had similar telomere lengths. Telomeres of adults did not shorten over a 3-year period, regardless of the age of the individual. Neither telomere length, nor the rate at which the telomeres changed over these 3 years, correlated with breeding frequency or investment. Older females also produced larger volume clutches until approximately 15 years old and larger eggs produced heavier fledglings. Furthermore, reproductive success ( chicks fledged/eggs laid ) is maintained as females aged. Basal corticosterone, however, was not correlated with telomere length in adults and suggests that low basal corticosterone may play a role in the telomere maintenance we observed. Basal corticosterone also declined during the breeding season and was positively correlated with the age of adult penguins. This higher basal corticosterone in older individuals, and consistent reproductive success, supports the prediction that Magellanic penguins invest more in reproduction as they age. Our results

  11. Two Versus Three Narrow-Diameter Implants with Locator Attachments Supporting Mandibular Overdentures: A Two-Year Prospective Study

    Directory of Open Access Journals (Sweden)

    Ali M. El-Sheikh

    2012-01-01

    Full Text Available Purpose. To compare treatment outcome (survival rate, condition of hard and soft peri-implant tissues and prosthodontic maintenance requirements of two versus three narrow-diameter bone level implants with Locator attachments supporting mandibular overdentures. Materials and Methods. Twenty completely edentulous patients with atrophic mandibles were treated. Ten patients (Group A were treated with overdentures supported by two narrow (3.3-mm diameter implants (Straumann AG, Basel, Switzerland and ten patients (Group B were treated with overdentures supported by three narrow implants. Locator (Zest Anchors, USA attachments were used for prosthetic anchorage. Standardized clinical and radiographic parameters (survival rate, plaque index, calculus index, gingival index, bleeding index, probing depth and marginal bone loss were evaluated at the time of the completion of the prosthetic treatment (baseline and after 6, 12 and 24 months of functional loading. Prosthodontic maintenance requirements were also scored. Results. Only one implant was lost (Group B during the healing period. There were no significant differences with regards to any of the studied clinical and radiographic parameters between the two groups (>0.05. Few prosthetic complications were recorded. Conclusions. No need to insert more than two narrow-diameter bone level implants with Locator attachments in cases of atrophic mandible to support an overdenture, however, long-term prospective studies are required to support this notion.

  12. Suncor maintenance and reliability

    Energy Technology Data Exchange (ETDEWEB)

    Little, S. [Suncor Energy, Calgary, AB (Canada)

    2006-07-01

    Fleet maintenance and reliability at Suncor Energy was discussed in this presentation, with reference to Suncor Energy's primary and support equipment fleets. This paper also discussed Suncor Energy's maintenance and reliability standard involving people, processes and technology. An organizational maturity chart that graphed organizational learning against organizational performance was illustrated. The presentation also reviewed the maintenance and reliability framework; maintenance reliability model; the process overview of the maintenance and reliability standard; a process flow chart of maintenance strategies and programs; and an asset reliability improvement process flow chart. An example of an improvement initiative was included, with reference to a shovel reliability review; a dipper trip reliability investigation; bucket related failures by type and frequency; root cause analysis of the reliability process; and additional actions taken. Last, the presentation provided a graph of the results of the improvement initiative and presented the key lessons learned. tabs., figs.

  13. Industry's efforts toward technology development related to aging management of PWR plants

    International Nuclear Information System (INIS)

    Tanaka, Hideo

    2010-01-01

    The term, 'aging plants', which refers to nuclear power plants operating more than 30 years, has become popular among local residents around nuclear power plants as well as among the media. The term 'aging' was first used in the title of the document issued by Agency of Natural Resources and Energy in 1996, 'The Basic Concept of Aging Management'. In addressing aging degradation, it was a matter of question which measure of time (date, month or year) should be used as a unit to consider an events. Although the aging plant was defined as a plant operating more than 30 years, the mode and timing of aging degradation depend on the environment and service conditions under which a component has been operating. Previous efforts made by related parties have contributed to the prevention of potential aging events which may challenge the reactor safety. Owing to such efforts, causes of some events attributable to defective design have been clarified and preventive maintenance measures, including the replacement and mitigation, have been taken accordingly. As a result, the number of events resulting from such aging phenomena has been reduced. On other other hand, the events caused by aging phenomena attributable to manufacturing processes (welding, surface treatment, etc.), which hardly emerge, are slightly increasing. There have been many cases that a shorter weld line due to lack of penetration in the narrow gap has been led to fatigue cracking. More recently, incidents of stress corrosion cracking due to work hardening and local tensile stresses on the surface have been observed. It should be noted that an effort to analyze not only the phenomena but also the mechanisms of the above events to clarify the root causes can improve the quality of preventive maintenance by means of rolling-out the analytical results to relevant plants. This paper introduces valuable experiences with the application of the results of technology development regarding to aging degradation of

  14. Maintenance Process Strategic Analysis

    Science.gov (United States)

    Jasiulewicz-Kaczmarek, M.; Stachowiak, A.

    2016-08-01

    The performance and competitiveness of manufacturing companies is dependent on the availability, reliability and productivity of their production facilities. Low productivity, downtime, and poor machine performance is often linked to inadequate plant maintenance, which in turn can lead to reduced production levels, increasing costs, lost market opportunities, and lower profits. These pressures have given firms worldwide the motivation to explore and embrace proactive maintenance strategies over the traditional reactive firefighting methods. The traditional view of maintenance has shifted into one of an overall view that encompasses Overall Equipment Efficiency, Stakeholders Management and Life Cycle assessment. From practical point of view it requires changes in approach to maintenance represented by managers and changes in actions performed within maintenance area. Managers have to understand that maintenance is not only about repairs and conservations of machines and devices, but also actions striving for more efficient resources management and care for safety and health of employees. The purpose of the work is to present strategic analysis based on SWOT analysis to identify the opportunities and strengths of maintenance process, to benefit from them as much as possible, as well as to identify weaknesses and threats, so that they could be eliminated or minimized.

  15. Building Maintenance, Management, and Budgeting.

    Science.gov (United States)

    Pawsey, M. R.

    1982-01-01

    Australian methods and formulas for funding building maintenance and management are outlined and found to be haphazard. Discussed are: ultimate costs of deferred maintenance, major plant replacements, life cycle costing, types of maintenance programs (including full preventive maintenance), use of computer programs for planning, and organization…

  16. Providing Our Fellows in Training with Education on Inflammatory Bowel Disease Health Maintenance to Improve the Quality of Care in Our Health Care System.

    Science.gov (United States)

    Lee, Ann Joo; Kraemer, Dale F; Smotherman, Carmen; Eid, Emely

    2016-01-01

    Inflammatory bowel disease (IBD) quality measures were established in an effort to standardize IBD health care. Despite effort to improve clinical performance, considerable variations in practice still exist. To further improve IBD health care, we propose incorporating an in-service educational session on IBD health maintenance to provide trainees with increasing awareness and knowledge on IBD management. Fifty electronic medical charts were randomly selected, and the level of quality documentation was assessed for 15 core IBD quality measures. Data were reported as the percentage of charts meeting audit criteria (compliance score). Fellows then attended an in-service educational session to review IBD quality measures and reinforce practice expectations. A second audit was then performed on an additional 50 patient charts to determine whether documentation practices improved after the educational session. We found a positive correlation between an in-service educational session and fellows' compliance with IBD health maintenance. Overall, the fellows' compliance score increased by 18% (before intervention, 65%; after intervention, 83%; P bases for IBD health maintenance. Incorporating a standard curriculum on IBD health maintenance provides fellows in training with increased awareness and guidance on managing the unique preventive care needs of patients with IBD.

  17. Maintenance performance improvement with System Dynamics : A Corrective Maintenance showcase

    NARCIS (Netherlands)

    Deenen, R.E.M.; Van Daalen, C.E.; Koene, E.G.C.

    2008-01-01

    This paper presents a case study of an analysis of a Corrective Maintenance process to realize performance improvement. The Corrective Maintenance process is supported by SAP, which has indicated the performance realisation problem. System Dynamics is used in a Group Model Building process to

  18. Analysis of maintenance strategies

    International Nuclear Information System (INIS)

    Laakso, K.; Simola, K.

    1998-01-01

    The main topics of the presentation include: (1) an analysis model and methods to evaluate maintenance action programs and the support decision to make changes in them and (2) to understand the maintenance strategies in a systems perspective as a basis for future developments. The subproject showed how systematic models for maintenance analysis and decision support, utilising computerised and statistical tool packages, can be taken into use for evaluation and optimisation of maintenance of active systems from the safety and economic point of view

  19. Optimal maintenance of a multi-unit system under dependencies

    Science.gov (United States)

    Sung, Ho-Joon

    reputable numerical techniques were used to model the problem as accurately as possible, including algorithms for the MC simulation, imperfect maintenance model from quasi renewal processes, repair time simulation, and state transition rules. Variance Reduction Techniques (VRTs) were also used in an effort to enhance MC simulation efficiency. After accurate MC simulation results are obtained, the RSEs are generated based on the goodness-of-fit measure to yield as parsimonious model as possible to construct the optimization problem. Under the assumption of constant failure rate for lifetime distributions, the inspection interval from the proposed methodology was found to be consistent with the one from the common approach used in industry that leverages Continuous Time Markov Chain (CTMC). While the latter does not consider maintenance cost settings, the proposed methodology enables an operator to consider different types of maintenance cost settings, e.g., inspection cost, system corrective maintenance cost, etc., to result in more flexible maintenance policies. When the proposed methodology was applied to the same TLD of FADEC example, but under the more generalized assumption of strictly Increasing Failure Rate (IFR) for lifetime distribution, it was shown to successfully capture component wear-out, as well as the economic dependencies among the system components.

  20. 23 CFR 633.208 - Maintenance.

    Science.gov (United States)

    2010-04-01

    ... responsibility of the State. The State may arrange for maintenance of such roads or portions thereof, by... 23 Highways 1 2010-04-01 2010-04-01 false Maintenance. 633.208 Section 633.208 Highways FEDERAL... PROVISIONS Federal-Aid Contracts (Appalachian Contracts) § 633.208 Maintenance. Maintenance of all highway...

  1. Expert Meeting Report: Key Innovations for Adding Energy Efficiency to Maintenance Projects

    Energy Technology Data Exchange (ETDEWEB)

    Wood, A.; Wiehagen, J.

    2012-09-01

    This report describes an expert meeting hosted by the Building America research team NAHB Research Center, which was held on February 8, 2012, in Orlando, Florida. The topic, Key Innovations for Adding Energy Efficiency to Maintenance Projects, was intended to provide direction to more focused efforts to increase the efficiency of existing homes; in this meeting, the focus was specifically for re-roofing and the opportunities for adding energy efficiency upgrades during this major home repair activity.

  2. Contribution of maintenance group towards automation/mechanization in natural uranium fuel plants

    International Nuclear Information System (INIS)

    Banerjee, P.K.

    1997-01-01

    Competition in an increasingly global economy has created new benchmarks. Developing successful efforts to continuously improve performance is becoming a key responsibility of engineers and managers in all organisations. Recent studies have shown that maintenance has got great impact on the overall performance and profitability of the organisations. Development of mechanization and automation in existing equipment has a direct bearing on the available manpower, production requirement, quality specification for raw material, energy consumption and working environment

  3. Asphalt in Pavement Maintenance.

    Science.gov (United States)

    Asphalt Inst., College Park, MD.

    Maintenance methods that can be used equally well in all regions of the country have been developed for the use of asphalt in pavement maintenance. Specific information covering methods, equipment and terminology that applies to the use of asphalt in the maintenance of all types of pavement structures, including shoulders, is provided. In many…

  4. Tools and Techniques for Evaluating the Effects of Maintenance Resource Management (MRM) in Air Safety

    Science.gov (United States)

    Taylor, James C.

    2002-01-01

    This research project was designed as part of a larger effort to help Human Factors (HF) implementers, and others in the aviation maintenance community, understand, evaluate, and validate the impact of Maintenance Resource Management (MRM) training programs, and other MRM interventions; on participant attitudes, opinions, behaviors, and ultimately on enhanced safety performance. It includes research and development of evaluation methodology as well as examination of psychological constructs and correlates of maintainer performance. In particular, during 2001, three issues were addressed. First a prototype process for measuring performance was developed and used. Second an automated calculator was developed to aid the HF implementer user in analyzing and evaluating local survey data. These results include being automatically compared with the experience from all MRM programs studied since 1991. Third the core survey (the Maintenance Resource Management Technical Operations Questionnaire, or 'MRM/TOQ') was further developed and tested to include topics of added relevance to the industry.

  5. Maintenance analysis method and operational feedback: a comprehensive maintenance management

    International Nuclear Information System (INIS)

    Mathieu Riou; Victor Planchon

    2006-01-01

    Full text of publication follows: Current periodic inspections program carried out on the COGEMA LOGISTICS casks is required by regulations and approved by the competent Authority. Thus, Safety and casks conformity to the according certificate of approval are guaranteed. Nonetheless, based on experience it appeared that some maintenance operations did not seem relevant or were redundant. Then, it was decided to rethink completely our maintenance program to reach the following objectives: - Set up the 'a minima' required inspection operations required to guarantee Safety and conformity to the certificate of approval, - Optimize criteria and periodicities of inspections taking into account: operational feedback, routine inspections carried out for each transport, regulations, environmental impact (ALARA, waste reduction,...), cost-effectiveness (reduction of cask's immobilization period,...). - Set up a maintenance program in Safety Analysis Reports that: stands alone (no need to check the specification or the certificate of approval to have the complete list of inspections mandatory to guarantee Safety), gives objectives instead of means of controls. This approach needs then to be re-evaluated by the competent Authority. Study's scope has been limited to the TN TM 12 cask family which is intensely used. COGEMA LOGISTICS has a high operational feedback on these casks. After Authority agreement, and in accordance with its requirements, study will then be extended to the other casks belonging to the COGEMA LOGISTICS cask fleet. Actually, the term 'maintenance' is linked to 'Base maintenance' and 'Main maintenance' and implicitly means that the cask is immobilized for a given period. To emphasize the modifications, the term 'maintenance' is no longer used and is substituted by 'periodic upkeep'. By changing the name, COGEMA LOGISTICS wants to emphasize that: some operations can for instance be realized while the cask is unloaded, periodicities are thought in terms of

  6. Job analysis of the instrument and control technician position for the nuclear power plant maintenance personnel reliability model

    International Nuclear Information System (INIS)

    Siegel, A.I.; Bartter, W.D.; Federman, P.J.

    1983-08-01

    This report is one of a series that is planned to describe the results of a program undertaken by the Oak Ridge National Laboratory (ORNL) for the US Nuclear Regulatory Commission, Office of Nuclear Regulatory Research, to define, develop, validate, and disseminate a methodology for the quantitative prediction of human reliability in the conduct of maintenance tasks in nuclear power plants (NPPs). ORNL has subcontracted portions of this effort to Applied Psychological Services, Inc. This report on the job analysis of the Instrument and Control technician (NUREG/CR-3274) and a report on the job analysis of the electrician position (NUREG/CR-3275) comprise a part of the initial efforts of the development phase of this program. With the publication of the job analysis of the electrician position, the series of job analyses reports addressing nuclear power plant maintenance personnel will be complete. Subsequent reports addressing model development and validation are planned

  7. Dukovany NPP maintenance management

    International Nuclear Information System (INIS)

    Siegel, F.

    2005-01-01

    Maintenance planning and management for the technological equipment of the Dukovany NPP are described. A Maintenance Control and Evaluation System has been developed and is in use to help manage the complex maintenance issue. Practical examples of outputs of the System, with a comprehensive use of the cost, reliability and safety related data, are presented. (author)

  8. Machine Maintenance Scheduling with Reliability Engineering Method and Maintenance Value Stream Mapping

    Science.gov (United States)

    Sembiring, N.; Nasution, A. H.

    2018-02-01

    Corrective maintenance i.e replacing or repairing the machine component after machine break down always done in a manufacturing company. It causes the production process must be stopped. Production time will decrease due to the maintenance team must replace or repair the damage machine component. This paper proposes a preventive maintenance’s schedule for a critical component of a critical machine of an crude palm oil and kernel company due to increase maintenance efficiency. The Reliability Engineering & Maintenance Value Stream Mapping is used as a method and a tool to analize the reliability of the component and reduce the wastage in any process by segregating value added and non value added activities.

  9. PROCESS OF CHANGES OF MAINTENANCE-FREE ONBOARD SYSTEM OPERATIONAL STATUS BETWEEN SCHEDULED MAINTENANCES

    Directory of Open Access Journals (Sweden)

    Andrey Mikhaylovich Bronnikov

    2017-01-01

    Full Text Available In this article the authors consider the problem of simulating the process of a maintenance-free between scheduled maintenance aircraft system operational status changes, which failure during the flight leads to the disaster. On-board equipment with automatic self-repair between routine maintenance in the event the components fail is called maintenance-free. During operation, onboard equipment accumulates failures maintaining its functions with a safety level not lower than the required minimum. Trouble shooting is carried out either at the end of between-maintenance period (as a rule, or after the failure, which led to the functions disorder or to the decrease below the target level of flight safety (as an exception. The system contains both redundant and nonredundant units and elements with the known failure rates. The system can be in one of the three states: operable, extreme, failed. The excessive redundant elements allow the system to accumulate failures which are repaired during the routine maintenance. The process of system operational status changes is described with the discrete-continuous model in the flight time. Basing on the information about the probabilities of the on-board equipment being in an operable, extreme or failed state, it is possible to calculate such complex efficiency indicators as the average loss of sorties, the average operating costs, the expected number of emergency recovery operations and others. Numerical studies have been conducted to validate the proposed model. It is believed that maintenance work completely updates the system. The analysis of these indicators will allow to evaluate the maintenance-free aircraft equipment operation efficiency, as well as to make an effectiveness comparison with other methods of technical operation. The model can be also used to assess the technical operation systems performance. The model can be used to optimize the period between maintenance.

  10. Maintenance Trades Guidelines

    Science.gov (United States)

    Weidner, Theodore J.

    2008-01-01

    In 2002, APPA published "Maintenance Staffing Guidelines for Educational Facilities," the first building maintenance trades staffing guideline designed to assist educational facilities professionals with their staffing needs. addresses how facilities professionals can determine the appropriate size and mix of their organization. Contents…

  11. Ethnicity- and sex-based discrimination and the maintenance of self-esteem.

    Science.gov (United States)

    Lönnqvist, Jan-Erik; Hennig-Schmidt, Heike; Walkowitz, Gari

    2015-01-01

    The psychological underpinnings of labor market discrimination were investigated by having participants from Israel, the West Bank and Germany (N = 205) act as employers in a stylized employment task in which they ranked, set wages, and imposed a minimum effort level on applicants. State self-esteem was measured before and after the employment task, in which applicant ethnicity and sex were salient. The applicants were real people and all behavior was monetarily incentivized. Supporting the full self-esteem hypothesis of the social identity approach, low self-esteem in women was associated with assigning higher wages to women than to men, and such behavior was related to the maintenance of self-esteem. The narrower hypothesis that successful intergroup discrimination serves to protect self-esteem received broader support. Across all participants, both ethnicity- and sex-based discrimination of out-groups were associated with the maintenance of self-esteem, with the former showing a stronger association than the latter.

  12. Ethnicity- and Sex-Based Discrimination and the Maintenance of Self-Esteem

    Science.gov (United States)

    2015-01-01

    The psychological underpinnings of labor market discrimination were investigated by having participants from Israel, the West Bank and Germany (N = 205) act as employers in a stylized employment task in which they ranked, set wages, and imposed a minimum effort level on applicants. State self-esteem was measured before and after the employment task, in which applicant ethnicity and sex were salient. The applicants were real people and all behavior was monetarily incentivized. Supporting the full self-esteem hypothesis of the social identity approach, low self-esteem in women was associated with assigning higher wages to women than to men, and such behavior was related to the maintenance of self-esteem. The narrower hypothesis that successful intergroup discrimination serves to protect self-esteem received broader support. Across all participants, both ethnicity- and sex-based discrimination of out-groups were associated with the maintenance of self-esteem, with the former showing a stronger association than the latter. PMID:25978646

  13. Optimization of surface maintenance

    International Nuclear Information System (INIS)

    Oeverland, E.

    1990-01-01

    The present conference paper deals with methods of optimizing the surface maintenance of steel-made offshore installations. The paper aims at identifying important approaches to the problems regarding the long-range planning of an economical and cost effective maintenance program. The methods of optimization are based on the obtained experiences from the maintenance of installations on the Norwegian continental shelf. 3 figs

  14. Practice makes perfect: self-reported adherence a positive marker of inhaler technique maintenance.

    Science.gov (United States)

    Azzi, Elizabeth; Srour, Pamela; Armour, Carol; Rand, Cynthia; Bosnic-Anticevich, Sinthia

    2017-04-24

    Poor inhaler technique and non-adherence to treatment are major problems in the management of asthma. Patients can be taught how to achieve good inhaler technique, however maintenance remains problematic, with 50% of patients unable to demonstrate correct technique. The aim of this study was to determine the clinical, patient-related and/or device-related factors that predict inhaler technique maintenance. Data from a quality-controlled longitudinal community care dataset was utilized. 238 patients using preventer medications where included. Data consisted of patient demographics, clinical data, medication-related factors and patient-reported outcomes. Mixed effects logistic regression was used to identify predictors of inhaler technique maintenance at 1 month. The variables found to be independently associated with inhaler technique maintenance using logistic regression (Χ 2 (3,n = 238) = 33.24, p < 0.000) were inhaler technique at Visit 1 (OR 7.1), device type (metered dose inhaler and dry powder inhalers) (OR 2.2) and self-reported adherent behavior in the prior 7 days (OR 1.3). This research is the first to unequivocally establish a predictive relationship between inhaler technique maintenance and actual patient adherence, reinforcing the notion that inhaler technique maintenance is more than just a physical skill. Inhaler technique maintenance has an underlying behavioral component, which future studies need to investigate. BEHAVIORAL ELEMENT TO CORRECT LONG-TERM INHALER TECHNIQUES: Patients who consciously make an effort to perfect asthma inhaler technique will maintain their skills long-term. Elizabeth Azzi at the University of Sydney, Australia, and co-workers further add evidence that there is a strong behavioral component to patients retaining correct inhaler technique over time. Poor inhaler technique can limit asthma control, affecting quality of life and increasing the chances of severe exacerbations. Azzi's team followed 238 patients to

  15. Nuclear maintenance and management system

    International Nuclear Information System (INIS)

    Yamaji, Yoshihiro; Abe, Norihiko

    2000-01-01

    The Mitsubishi Electric Co., Ltd. has developed to introduce various computer systems for desk-top business assistance in a power plant such as system isolation assisting system, operation parameter management system, and so on under aiming at business effectiveness since these ten and some years. Recently, by further elapsed years of the plants when required for further cost reduction and together with change of business environment represented by preparation of individual personal computer, further effectiveness, preparation of the business environment, and upgrading of maintenance in power plant business have been required. Among such background, she has carried out various proposals and developments on construction of a maintenance and management system integrated the business assistant know-hows and the plant know-hows both accumulated previously. They are composed of three main points on rationalization of business management and document management in the further effectiveness, preparation of business environment, TBM maintenance, introduction of CBM maintenance and introduction of maintenance assistance in upgrading of maintenance. Here was introduced on system concepts aiming at the further effectiveness of the nuclear power plant business, preparation of business environment, upgrading of maintenance and maintenance, and so on, at a background of environment around maintenance business in the nuclear power plants (cost-down, highly elapsed year of the plant, change of business environment). (G.K)

  16. Information-Based Maintenance Optimization with Focus on Predictive Maintenance (Informatiegebaseerde onderhoudsoptimalisatie met focus op predictief onderhoud)

    OpenAIRE

    Van Horenbeek, Adriaan

    2013-01-01

    This dissertation presents an information-based maintenance optimization methodology for physical assets; with focus on, but not limited to, predictive maintenance (PdM). The overall concept of information-based maintenance is that of updating maintenance decisions based on evolving knowledge of operation history and anticipated usage of the machinery, as well as the physics and dynamics of material degradation in critical machinery components. Within this concept, predictive maintenance is a...

  17. Centralized operations and maintenance planning at the Atacama Large Millimeter/submillimeter Array (ALMA)

    Science.gov (United States)

    Lopez, Bernhard; Whyborn, Nicholas D.; Guniat, Serge; Hernandez, Octavio; Gairing, Stefan

    2016-07-01

    The Atacama Large Millimeter/submillimeter Array (ALMA) is a joint project between astronomical organizations in Europe, North America, and East Asia, in collaboration with the Republic of Chile. ALMA consists of 54 twelve-meter antennas and 12 seven-meter antennas operating as an aperture synthesis array in the (sub)millimeter wavelength range. Since the inauguration of the observatory back in March 2013 there has been a continuous effort to establish solid operations processes for effective and efficient management of technical and administrative tasks on site. Here a key aspect had been the centralized maintenance and operations planning: input is collected from science stakeholders, the computerized maintenance management system (CMMS) and from the technical teams spread around the world, then this information is analyzed and consolidated based on the established maintenance strategy, the observatory long-term plan and the short-term priorities definitions. This paper presents the high-level process that has been developed for the planning and scheduling of planned- and unplanned maintenance tasks, and for site operations like the telescope array reconfiguration campaigns. We focus on the centralized planning approach by presenting its genesis, its current implementation for the observatory operations including related planning products, and we explore the necessary next steps in order to fully achieve a comprehensive centralized planning approach for ALMA in steady-state operations.

  18. A Planned Preventive Maintenance Program. A Handbook for Chief Business Officers and Supervisors of Maintenance with Suggestions on Maintenance for Consideration by Presidents of Higher Institutions.

    Science.gov (United States)

    Daniel, Clarence H.

    This handbook explains planned preventive maintenance program, which is an operational system of maintenance designed to increase the effectiveness of the maintenance staff and the use of maintenance funds through efficient scheduling of inspections and follow-through of work to be performed. Sections are included for the chief administrative…

  19. A cask maintenance facility feasibility study

    International Nuclear Information System (INIS)

    Rennich, M.J.; Medley, L.G.; Attaway, C.R.

    1989-01-01

    The Oak Ridge National Laboratory (ORNL) is developing a transportation system for spent nuclear fuel (SNF) and defense high level waste (HLW) as a part of the Federal Waste Management System (FWMS). In early 1988, a feasibility study was undertaken to design a stand-alone, ''green field'' facility for maintaining the FWMS casks. The feasibility study provided an initial layout facility design, an estimate of the construction cost, and an acquisition schedule for a Cask Maintenance Facility (CMF). The study also helped to define the interfaces between the transportation system and the waste generators, the repository, and a Monitored Retrievable Storage (MRS) facility. The data, design, and estimated costs resulting from the study have been organized for use in the total transportation system decision-making process. Most importantly, the feasibility study also provides a foundation for continuing design and planning efforts. Fleet servicing facility studies, operational studies from current cask system operators, a definition of the CMF system requirements, and the experience of others in the radioactive waste transportation field were used as a basis for the feasibility study. In addition, several cask handling facilities were visited to observe and discuss cask operations to establish the functions and methods of cask maintenance expected to be used in the facility. Finally, a peer review meeting was held at Oak Ridge, Tennessee in August, 1988, in which the assumptions, design, layout, and functions of the CMF were significantly refined. Attendees included representatives from industry, the repository and transportation operations

  20. Language Maintenance in a Multilingual Family: Informal Heritage Language Lessons in Parent-Child Interactions

    OpenAIRE

    Kheirkhah, Mina; Cekaite, Asta

    2015-01-01

    The present study explores language socialization patterns in a Persian-Kurdish family in Sweden and examines how "one-parent, one-language" family language policies are instantiated and negotiated in parent-child interactions. The data consist of video-recordings and ethnographic observations of family interactions, as well as interviews. Detailed interactional analysis is employed to investigate parental language maintenance efforts and the childs agentive orientation in relation to the rec...

  1. Component-Based Data-Driven Predictive Maintenance to Reduce Unscheduled Maintenance Events

    NARCIS (Netherlands)

    Verhagen, W.J.C.; Curran, R.; de Boer, L.W.M.; Chen, C.H.; Trappey, A.C.; Peruzzini, M.; Stjepandić, J.; Wognum, N.

    2017-01-01

    Costs associated with unscheduled and preventive maintenance can contribute significantly to an airline's expenditure. Reliability analysis can help to identify and plan for maintenance events. Reliability analysis in industry is often limited to statistically based

  2. Remote maintenance for fusion experimental reactor

    International Nuclear Information System (INIS)

    Koizumi, Koichi; Takeda, Nobukazu

    2000-01-01

    Here was introduced on maintenance of reactor core portion operated by remote control among maintenance of the International Thermonuclear Experimental Reactor (ITER) begun on its design since 1988 under international cooperation of U.S.A., Europe, Russia and Japan. Every appliances constructing the reactor core portion is necessary to carry out all of their inspection and maintenance by using remote controlled apparatus because of their radiation due to neutron generated by DT combustion of plasma. For engineering design activity (EDA) in ITER, not only design and development of the remote control appliances but also design under consideration of remote maintenance for from structural design of maintained objective appliances to access method to appliances, transportation and preservation method of radiated matters, and out-reactor maintenance in a hot cell, is now under progress. Here were also reported on basic concept on maintenance and conservation of ITER, maintenance design of diverter and blanket with high maintenance frequency and present state on development of maintenance appliances. (G.K.)

  3. Multidisciplinary Approach for Full-Mouth Rehabilitation of an Adult Patient with Collapsed Occlusal Plane and Several Missing Teeth: A Clinical Report.

    Science.gov (United States)

    Cheong, Jieun; Hwang, Yu-Sun; Jung, Bock-Yung

    2018-03-13

    In the full-mouth rehabilitation of a patient with severely collapsed occlusion, a multidisciplinary approach including prosthodontics, orthodontics, endodontics, and surgery could provide better esthetic and functional results. Orthodontic treatment aiming for stable occlusion that meets the standard requirement of functional occlusion, enables the maintenance of occlusal function, and guarantees long-term stability on the basis of periodontal health was attempted. The essential element of this protocol is careful treatment planning based on the optimal sequence pursuing functional occlusion. © 2018 by the American College of Prosthodontists.

  4. The advantages of reliability centered maintenance for standby safety systems

    International Nuclear Information System (INIS)

    Dam, R.F.; Ayazzudin, S.; Nickerson, J.H.; DeLong, A.I.

    2002-01-01

    predictive monitoring. The testing in this strategy is part of an effort to ensure that the desired function is not only available today, but will be available tomorrow as well. This paper considers the application of a streamlined form of RCM to the Emergency Core Cooling (ECC) and Standby Generator (SG) Systems of a CANDU plant. Recently completed studies provide useful insight into the important value added of the systematic assessment approach (using RCM techniques) for these standby safety systems. In the case of RCM analysis performed on the Emergency Core Cooling (ECC) System of Point Lepreau Nuclear Power Generating Station (PLGS), it was found that 60% of the current maintenance tasks are testing (functional, stroke, logic, and annunciation tests). Similarly, the SGs have 50% of the maintenance tasks associated with testing. The paper considers how the results of the RCM analysis demonstrate that the analysis can be used to assist in the optimization of the testing program dictated by reliability while also taking better advantage of the testing through condition monitoring and predictive maintenance techniques. Further, the results illustrate the importance of identifying and linking the different plant activities within a well integrated plant culture. (author)

  5. Residual life management. Maintenance improvement

    International Nuclear Information System (INIS)

    Sainero Garcia, J.; Hevia Ruperez, F.

    1995-01-01

    The terms Residual Life Management, Life Cycle Management and Long-Term Management are synonymous with a concept which aims to establish efficient maintenance for the profitable and safe operation of a power plant for as long as possible. A Residual Life Management programme comprises a number of stages, of which Maintenance Evaluation focuses on how power plant maintenance practices allow the mitigation and control of component ageing. with this objective in mind, a methodology has been developed for the analysis of potential degradative phenomena acting on critical components in terms of normal power plant maintenance practices. This methodology applied to maintenance evaluation enables the setting out of a maintenance programme based on the Life Management concept, and the programme's subsequent up-dating to allow for new techniques and methods. Initial applications have shown that although, in general terms, power plant maintenance is efficient, the way in which Residual Life Management is approached requires changes in maintenance practices. These changes range from modifications to existing inspection and surveillance methods or the establishment of new ones, to the monitoring of trends or the performance of additional studies, the purpose of which is to provide an accurate evaluation of the condition of the installations and the possibility of life extension. (Author)

  6. Techniques for remote maintenance of in-cell material-handling system in the HFEF/N main cell

    International Nuclear Information System (INIS)

    Tobias, D.A.; Frickey, C.A.

    1975-01-01

    Operations in the main cell of HFEF/N have required development of remote handling equipment and unique techniques for maintaining the in-cell material-handling system. Specially designed equipment is used to remove a disabled crane or electromechanical manipulator bridge from its support rails and place it on floor stands for repair or maintenance. Support areas for the main cell, such as the spray chamber and hot repair area, provide essential decontamination, repair, and staging areas for the in-cell material-handling-system equipment and tools. A combined engineering and technical effort in upgrading existing master-slave manipulators has definitely reduced the requirements for their maintenance. The cell is primarily for postirradiation examination of LMFBR materials and fuel elements

  7. Software evolution and maintenance

    CERN Document Server

    Tripathy, Priyadarshi

    2014-01-01

    Software Evolution and Maintenance: A Practitioner's Approach is an accessible textbook for students and professionals, which collates the advances in software development and provides the most current models and techniques in maintenance.Explains two maintenance standards: IEEE/EIA 1219 and ISO/IEC14764Discusses several commercial reverse and domain engineering toolkitsSlides for instructors are available onlineInformation is based on the IEEE SWEBOK (Software Engineering Body of Knowledge)

  8. Turbine maintenance and modernization

    Energy Technology Data Exchange (ETDEWEB)

    Unga, E [Teollisuuden Voima Oy, Olkiluoto (Finland)

    1999-12-31

    The disturbance-free operation of the turbine plant plays an important role in reaching good production results. In the turbine maintenance of the Olkiluoto nuclear power plant the lifetime and efficiency of turbine components and the lifetime costs are taken into account in determining the turbine maintenance and modernization/improvement program. The turbine maintenance program and improvement/modernization measures taken in the plant units are described in this presentation. (orig.)

  9. Laboratory equipment maintenance contracts.

    Science.gov (United States)

    Boudreau, D A; Scheer, W D; Catrou, P G

    1985-12-01

    The increasing level of technical sophistication and complexity found in clinical laboratory instrumentation today more than ever demands careful attention to maintenance service needs. The time-worn caution for careful definition of requirements for acquisition of a system should also carry over to acquisition of maintenance service. Guidelines are presented for specifications of terms and conditions for maintenance service from the perspective of the laboratorian in the automated clinical laboratory.

  10. Turbine maintenance and modernization

    Energy Technology Data Exchange (ETDEWEB)

    Unga, E. [Teollisuuden Voima Oy, Olkiluoto (Finland)

    1998-12-31

    The disturbance-free operation of the turbine plant plays an important role in reaching good production results. In the turbine maintenance of the Olkiluoto nuclear power plant the lifetime and efficiency of turbine components and the lifetime costs are taken into account in determining the turbine maintenance and modernization/improvement program. The turbine maintenance program and improvement/modernization measures taken in the plant units are described in this presentation. (orig.)

  11. Buspirone maintenance does not alter the reinforcing, subjective, and cardiovascular effects of intranasal methamphetamine.

    Science.gov (United States)

    Reynolds, Anna R; Strickland, Justin C; Stoops, William W; Lile, Joshua A; Rush, Craig R

    2017-12-01

    Medications development efforts for methamphetamine-use disorder have targeted central monoamines because these systems are directly involved in the effects of methamphetamine. Buspirone is a dopamine autoreceptor and D3 receptor antagonist and partial agonist at serotonin 1A receptors, making it a logical candidate medication for methamphetamine-use disorder. Buspirone effects on abuse-related behaviors of methamphetamine have been mixed in clinical and preclinical studies. Experimental research using maintenance dosing, which models therapeutic use, is limited. This study evaluated the influence of buspirone maintenance on the reinforcing effects of methamphetamine using a self-administration procedure, which has predictive validity for clinical efficacy. The impact of buspirone maintenance on the subjective and cardiovascular response to methamphetamine was also determined. Eight research participants (1 female) reporting recent illicit stimulant use completed a placebo-controlled, crossover, double-blind protocol in which the pharmacodynamic effects of intranasal methamphetamine (0, 15, and 30mg) were assessed after at least 6days of buspirone (0 and 45mg/day) maintenance. Intranasal methamphetamine functioned as a reinforcer and produced prototypical stimulant-like subjective (e.g., increased ratings of Good Effects and Like Drug) and cardiovascular (e.g., elevated blood pressure) effects. These effects of methamphetamine were similar under buspirone and placebo maintenance conditions. Maintenance on buspirone was well tolerated and devoid of effects when administered alone. These data suggest that buspirone is unlikely to be an effective pharmacotherapy for methamphetamine-use disorder. Given the central role of monoamines in methamphetamine-use disorder, it is reasonable for future studies to continue to target these systems. Copyright © 2017 Elsevier B.V. All rights reserved.

  12. Final report of MoReMO 2011-2012. Modelling resilience for maintenance and outage

    International Nuclear Information System (INIS)

    Gotcheva, N.; Macchi, L.; Oedewald, P.; Eitrheim, M.H.R.; Axelsson, C.; Reiman, T.; Pietikaeinen, E.

    2013-04-01

    The project Modelling Resilience for Maintenance and Outage (MoReMO) represents a two-year joint effort by VTT Technical Research Centre of Finland, Institute for Energy Technology (IFE, Norway) and Vattenfall (Sweden) to develop and test new approaches for safety management. The overall goal of the project was to present concepts on how resilience can be operationalized and built in a safety critical and socio-technical context. Furthermore, the project also aimed at providing guidance for other organizations that strive to develop and improve their safety performance in a business driven industry. We have applied four approaches in different case studies: Organisational Core Task modelling (OCT), Functional Resonance Analysis Method (FRAM), Efficiency Thoroughness Trade-Off (ETTO) analysis, and Work Practice and Culture Characterisation. During 2011 and 2012 the MoReMO project team has collected data through field observations, interviews, workshops, and document analysis on the work practices and adjustments in maintenance and outage in Nordic NPPs. The project consisted of two sub-studies, one focused on identifying and assessing adjustments and supporting resilient work practices in maintenance activities, while the other focused on handling performance trade-offs in maintenance and outage, as follows: A. Adjustments in maintenance work in Nordic nuclear power plants (VTT and Vattenfall). B. Handling performance trade-offs - the support of adaptive capacities (IFE and Vattenfall). The historical perspective of maintenance and outage management (Chapter 1.1) was provided by Vattenfall. Together, the two sub-studies have provided valuable insights for understanding the rationale behind work practices and adjustments, their effects on resilience, promoting flexibility and balancing between flexibility and reliability. (Author)

  13. Final report of MoReMO 2011-2012. Modelling resilience for maintenance and outage

    Energy Technology Data Exchange (ETDEWEB)

    Gotcheva, N.; Macchi, L.; Oedewald, P. [Technical Research Centre of Finland (VTT), Espoo (Finland); Eitrheim, M.H.R. [Institute for Energy Technology (IFE) (Norway); Axelsson, C.; Reiman, T.; Pietikaeinen, E. [Ringhals AB (NPP), Vattenfall AB (Sweden)

    2013-04-15

    The project Modelling Resilience for Maintenance and Outage (MoReMO) represents a two-year joint effort by VTT Technical Research Centre of Finland, Institute for Energy Technology (IFE, Norway) and Vattenfall (Sweden) to develop and test new approaches for safety management. The overall goal of the project was to present concepts on how resilience can be operationalized and built in a safety critical and socio-technical context. Furthermore, the project also aimed at providing guidance for other organizations that strive to develop and improve their safety performance in a business driven industry. We have applied four approaches in different case studies: Organisational Core Task modelling (OCT), Functional Resonance Analysis Method (FRAM), Efficiency Thoroughness Trade-Off (ETTO) analysis, and Work Practice and Culture Characterisation. During 2011 and 2012 the MoReMO project team has collected data through field observations, interviews, workshops, and document analysis on the work practices and adjustments in maintenance and outage in Nordic NPPs. The project consisted of two sub-studies, one focused on identifying and assessing adjustments and supporting resilient work practices in maintenance activities, while the other focused on handling performance trade-offs in maintenance and outage, as follows: A. Adjustments in maintenance work in Nordic nuclear power plants (VTT and Vattenfall). B. Handling performance trade-offs - the support of adaptive capacities (IFE and Vattenfall). The historical perspective of maintenance and outage management (Chapter 1.1) was provided by Vattenfall. Together, the two sub-studies have provided valuable insights for understanding the rationale behind work practices and adjustments, their effects on resilience, promoting flexibility and balancing between flexibility and reliability. (Author)

  14. Remote maintenance systems requirements are being developed to provide design guidelines for machine components, to define maintenance interfaces, and to quantify maintenance equipment and procedures needed

    International Nuclear Information System (INIS)

    Spampinato, P.T.; Tabor, M.A.

    1988-01-01

    Remote maintenance systems requirements are being developed to provide design guidelines for machine components, to define maintenance interfaces, and to quantify maintenance equipment and procedures needed

  15. Research and development of remote maintenance equipment for ITER divertor maintenance

    International Nuclear Information System (INIS)

    Takeda, Nobukazu; Kakudate, Satoshi; Nakahira, Masataka

    2005-02-01

    To facilitate easy remote maintainability, the ITER divertor is divided into 60 cassettes, which are transported in the toroidal and radial directions for replacement through maintenance ports located every 90 degrees using the divertor remote maintenance equipment such as in- and ex-vessel transporters. The cassette of 25 tons has to be transported and installed in the vacuum vessel with a positioning accuracy less than 2 mm in the limited space of the vacuum vessel and maintenance port under the intense gamma radiation field. Based on these requirements, the following design and tests were performed. (1) Link mechanism was studied to apply to the transportation of the heavy cassette in the restricted space. A compact mechanism with links for transportation of heavy cassette is designed through the optimization of the link angle taking account of space requirement and force efficiency. As a test result, the lifting capacity of 30 tons (larger than the cassette weight of 25 tons) using two link mechanisms has been demonstrated in the limited space. (2) Compact link mechanism was also studied to apply for locking of the cassette through the optimization of the link angle taking account of space requirement and force efficiency. As a test result, the final positioning accuracy of 0.03 mm for the 25 tons-cassette installation on the vacuum vessel from the initial positioning error of 5 mm has been demonstrated, so that the test result satisfies the requirement less than 2 mm using the link mechanisms in the limited space. (3) Sensor-based control using simple sensors such as optical fiber for divertor maintenance was tested using the full-scale mock-up divertor cassette and remote maintenance equipment. As a result, it is found that the positioning accuracy of 0.16 mm has been achieved by the optical fiber sensor and this value is sufficient for sensor-based control. In addition, the maintenance operation has been carried out through the human-machine interface

  16. Two Different Maintenance Strategies in the Hospital Environment: Preventive Maintenance for Older Technology Devices and Predictive Maintenance for Newer High-Tech Devices

    OpenAIRE

    Sezdi, Mana

    2016-01-01

    A maintenance program generated through the consideration of characteristics and failures of medical equipment is an important component of technology management. However, older technology devices and newer high-tech devices cannot be efficiently managed using the same strategies because of their different characteristics. This study aimed to generate a maintenance program comprising two different strategies to increase the efficiency of device management: preventive maintenance for older tec...

  17. Total Productive Maintenance at Paccar INC

    OpenAIRE

    Ştefan Farkas

    2010-01-01

    This paper reports the application of total productive maintenance method at Paccar Inc. truck’s plant in Victoria, Australia. The total productive maintenance method and total productive maintenance house are presented. The global equipment effectiveness is computed and exemplified. The production structure and organising maintenance are presented. Resultas of the variation of global equipment effectiveness and autonomous maintenance in a two weeks period of time are reported.

  18. CRITICAL FACTORS THAT LEAD TO GREEN BUILDING OPERATIONS AND MAINTENANCE PROBLEMS IN MALAYSIA

    OpenAIRE

    Izran Sarrazin MOHAMMAD; Nurul Nadiah ZAINOL; Shardy ABDULLAH; Neo Bee WOON; Nur Aqlima RAMLI

    2014-01-01

    The development of green buildings has become a trend in recent years in the effort to enhance the well-being of the community, environmental health, and life-cycle cost. However, many have argued that the complexities rendered by green buildings during the operational and maintenance phase often overshadow the benefits that can be gained through the development of green buildings. Several factors that lead to complexities in managing and maintaining green buildings have been highlighted by s...

  19. Advanced maintenance strategies for power plant operators--introducing inter-plant life cycle management

    International Nuclear Information System (INIS)

    Graeber, Ulrich

    2004-01-01

    One of the most important goals of competing power plant operators is to ensure safe operation of their plants, characterized by maximum availability throughout the entire life cycle and minimized specific generating costs. One parameter crucial to the total price of electricity--and one that can be actively influenced by the power plant operators--is maintenance. Up to 30% of all electricity generating costs accrue from maintenance. In the past years maintenance measures have been optimized particularly by the application and continuing development of testing and diagnostic techniques, by the increased level of system and component automation as well as more efficient organization structures. Despite the considerable success of these efforts, the potential for further cost reductions is still far from exhausted. But the risks connected to reliability, availability and safety need to be analyzed in greater detail in order to ensure the sustainability of the savings already achieved as well as those yet to be realized. The systematic application of condition-based maintenance and the implementation of structured life cycle management are essential requirements. An inter-plant approach is recommended to make a quick implementation of maintenance optimization potentials possible. Plant-specific improvement potentials can be established with the help of a best-practice comparison, and measures and priorities can be defined for realizing them. Creating an inter-plant database will allow experience and findings to be analyzed quickly and efficiently by experts and made available to all participants on a neutral platform. Despite--or maybe owing to--the increasingly competitive marketplace, a sustained reduction in the maintenance costs of power plant operators can only be achieved through a structured, inter-plant exchange of experience. The ZES offers the industry a suitable platform for cooperation with its 'Condition-Based Maintenance' research focus. The introduction

  20. Knowledge maintenance in myCBR

    OpenAIRE

    Aul, Vani; Sauer, Christian; Roth-Berghofer, Thomas

    2014-01-01

    CBR systems, being knowledge based systems, process knowledge. Due to changes in the environment a CBR system’s knowledge model can become outdated, thus creating a need for constant maintenance of said knowledge model. In this paper, we describe an implementation of (semi-)automatic knowledge maintenance of two of the four knowledge containers of CBR systems, specifically case base maintenance and maintenance of similarity measures within the CBR system development SDK myCBR. We describe our...

  1. GRAPHICAL MODELS OF THE AIRCRAFT MAINTENANCE PROCESS

    Directory of Open Access Journals (Sweden)

    Stanislav Vladimirovich Daletskiy

    2017-01-01

    Full Text Available The aircraft maintenance is realized by a rapid sequence of maintenance organizational and technical states, its re- search and analysis are carried out by statistical methods. The maintenance process concludes aircraft technical states con- nected with the objective patterns of technical qualities changes of the aircraft as a maintenance object and organizational states which determine the subjective organization and planning process of aircraft using. The objective maintenance pro- cess is realized in Maintenance and Repair System which does not include maintenance organization and planning and is a set of related elements: aircraft, Maintenance and Repair measures, executors and documentation that sets rules of their interaction for maintaining of the aircraft reliability and readiness for flight. The aircraft organizational and technical states are considered, their characteristics and heuristic estimates of connection in knots and arcs of graphs and of aircraft organi- zational states during regular maintenance and at technical state failure are given. It is shown that in real conditions of air- craft maintenance, planned aircraft technical state control and maintenance control through it, is only defined by Mainte- nance and Repair conditions at a given Maintenance and Repair type and form structures, and correspondingly by setting principles of Maintenance and Repair work types to the execution, due to maintenance, by aircraft and all its units mainte- nance and reconstruction strategies. The realization of planned Maintenance and Repair process determines the one of the constant maintenance component. The proposed graphical models allow to reveal quantitative correlations between graph knots to improve maintenance processes by statistical research methods, what reduces manning, timetable and expenses for providing safe civil aviation aircraft maintenance.

  2. Total Productive Maintenance at Paccar INC

    Directory of Open Access Journals (Sweden)

    Ştefan Farkas

    2010-06-01

    Full Text Available This paper reports the application of total productive maintenance method at Paccar Inc. truck’s plant in Victoria, Australia. The total productive maintenance method and total productive maintenance house are presented. The global equipment effectiveness is computed and exemplified. The production structure and organising maintenance are presented. Resultas of the variation of global equipment effectiveness and autonomous maintenance in a two weeks period of time are reported.

  3. Depot Maintenance: Executed Workload and Maintenance Operations at DOD Depots

    Science.gov (United States)

    2017-02-03

    in turn enable testing of helicopter rotor blades. The Army has also made investments in logistics software at all of its depots. According to the...maintenance and repair of structural helicopter airframes and blades; advanced composite technologies; flight controls and control surfaces; and...level maintenance on a wide range of vehicles and other military assets, including helicopters , combat vehicles, ships, aircraft, engines, and software

  4. Safety related maintenance in the framework of the reliability centered maintenance concept

    International Nuclear Information System (INIS)

    1992-07-01

    Elevated safety requirements and ever increasing costs of maintenance of nuclear power plants stimulate the interest in different methods and approaches to optimize maintenance activities. Among different concepts, the Reliability Centered Maintenance (RCM) as an approach to improve Preventive Maintenance (PM) programmes is being widely discussed an applied in several IAEA Member States. In order to summarize basic principles and current implementation of the RCM, the IAEA organized a Consultants Meeting in November 1990. The report prepared during that meeting was discussed during the Technical Committee Meeting (TCM) held in May 1991. Numerous technical presentations as well as panel and plenary discussions took place at the TCM. This document contains the report of the Consultants Meeting (modified to include comments of the TCM), a summary of the most important discussions as well as all 14 papers presented at the TCM

  5. Maintenance planning for nuclear power plants

    International Nuclear Information System (INIS)

    Mattu, R.K.; Cooper, S.E.; Lauderdale, J.R.

    2004-01-01

    Maintenance planning for nuclear power plants is similar to that in other industrial plants but it is heavily influenced by regulatory rules, with consequent costs of compliance. Steps by the nuclear industry and the Nuclear Regulatory Commission to address that problem include development of guidelines for maintenance of risk-critical equipment, using PRA-based techniques to select a set of equipment that requires maintenance and reliability-centered maintenance (RCM) approaches for determining what maintenance is required. The result of the process is a program designed to ensure effective maintenance of the equipment most critical to plant safety. (author)

  6. Reliability-centered maintenance for ground-based large optical telescopes and radio antenna arrays

    Science.gov (United States)

    Marchiori, G.; Formentin, F.; Rampini, F.

    2014-07-01

    In the last years, EIE GROUP has been more and more involved in large optical telescopes and radio antennas array projects. In this frame, the paper describes a fundamental aspect of the Logistic Support Analysis (LSA) process, that is the application of the Reliability-Centered Maintenance (RCM) methodology for the generation of maintenance plans for ground-based large optical telescopes and radio antennas arrays. This helps maintenance engineers to make sure that the telescopes continue to work properly, doing what their users require them to do in their present operating conditions. The main objective of the RCM process is to establish the complete maintenance regime, with the safe minimum required maintenance, carried out without any risk to personnel, telescope and subsystems. At the same time, a correct application of the RCM allows to increase the cost effectiveness, telescope uptime and items availability, and to provide greater understanding of the level of risk that the organization is managing. At the same time, engineers shall make a great effort since the initial phase of the project to obtain a telescope requiring easy maintenance activities and simple replacement of the major assemblies, taking special care on the accesses design and items location, implementation and design of special lifting equipment and handling devices for the heavy items. This maintenance engineering framework is based on seven points, which lead to the main steps of the RCM program. The initial steps of the RCM process consist of: system selection and data collection (MTBF, MTTR, etc.), definition of system boundaries and operating context, telescope description with the use of functional block diagrams, and the running of a FMECA to address the dominant causes of equipment failure and to lay down the Critical Items List. In the second part of the process the RCM logic is applied, which helps to determine the appropriate maintenance tasks for each identified failure mode. Once

  7. Application of reliability centred maintenance to optimize operation and maintenance in nuclear power plants

    International Nuclear Information System (INIS)

    2007-05-01

    In order to increase Member States capabilities in utilizing good engineering and management practices the Agency has developed a series of Technical Documents (TECDOCs) to describe best practices and members experience in the application of them. This TECDOC describes the concept of Reliability Centred Maintenance (RCM) which is the term used to describe a systematic approach to the evaluation, design and development of cost effective maintenance programmes for plant and equipment. The concept has been in existence for over 25 years originating in the civil aviation sector. This TECDOC supplements previous IAEA publications on the subject and seeks to reflect members experience in the application of the principles involved. The process focuses on the functionality of the plant and equipment and the critical failure mechanisms that could result in the loss of functionality. When employed effectively the process can result in the elimination of unnecessary maintenance activities and the identification and introduction of measures to address deficiencies in the maintenance programme. Overall the process can result in higher levels of reliability for the plant and equipment at reduced cost and demands on finite maintenance resources. The application of the process requires interaction between the operators and the maintenance practitioners which is often lacking in traditional maintenance programmes. The imposition of this discipline produces the added benefit of improved information flows between the key players in plant and equipment management with the result that maintenance activities and operational practices are better informed. This publication was produced within IAEA programme on nuclear power plants operating performance and life cycle management

  8. A STEPPING STONE TOWARDS KNOWLEDGE BASED MAINTENANCE

    OpenAIRE

    G. Waeyenbergh; L. Pintelon; L. Gelders

    2012-01-01

    Maintenance decision making becomes more and more a management concern. Some decades ago, maintenance was still often considered as an unavoidable side effect of production. The perception of maintenance has evolved considerably. One of the current issues is the maintenance concept, being the mix of maintenance interventions and the general framework for determining this mix. In this paper we describe a modular framework, called Knowledge Based Maintenance, for developing a customised mainten...

  9. Interactive videodisc in maintenance

    International Nuclear Information System (INIS)

    Zwingelstein, G.; Nguyen Van Nghi, B.

    1986-01-01

    After a recall of the videodisc characteristics, this paper presents its utilization by Electricite de France in the framework of training and maintenance. The SICMA (Interactive Communication System in Maintenance) developed and tested by Electricte de France is presented as also its utilization. It has been tested on the sites of Dampierre and Paluel in the cases of training and maintenance (deconnexion of drive rods of control elements); the conclusions of this experimentation are finally given. 4 refs [fr

  10. Status of fusion maintenance

    International Nuclear Information System (INIS)

    Fuller, G.M.

    1984-01-01

    Effective maintenance will be an essential ingredient in determining fusion system productivity. This level of productivity will result only after close attention is paid to the entire system as an entity and appropriate integration of the elements is made. The status of fusion maintenance is reviewed in the context of the entire system. While there are many challenging developmental tasks ahead in fusion maintenance, the required technologies are available in several high-technology industries, including nuclear fission

  11. Condition-based maintenance for complex systems : Coordinating maintenance and logistics planning for the process industries

    NARCIS (Netherlands)

    Olde Keizer, Minou Catharina Anselma

    2016-01-01

    Maintenance planning in the process industries is extremely complex for various reasons. Plants often run nonstop, allowing little time for performing preventive maintenance. Failures should be prevented, however, as they can lead to system downtime and high losses of revenue. Corrective maintenance

  12. PREVENTIVE MAINTENANCE. HONEYWELL PLANNING GUIDE.

    Science.gov (United States)

    Honeywell, Inc., Minneapolis, Minn.

    THIS HONEYWELL PAMPHLET DISCUSSES SOME ASPECTS OF PREVENTIVE MAINTENANCE OF AUTOMATIC CONTROLS, HEATING, VENTILATING, AND AIR CONDITIONING, AND COMPARES IN-PLANT WITH CONTRACT SERVICE, CONCLUDING THAT CONTRACT SERVICE IS PREFERABLE AND DESCRIBING A NUMBER OF MAINTENANCE PLANS WHICH THEY FURNISH. PREVENTIVE MAINTENANCE PROVIDES--(1) MORE EFFICIENT…

  13. Pacific Northwest Laboratory Maintenance Implementation plan

    International Nuclear Information System (INIS)

    Bright, J.D.

    1992-06-01

    This Maintenance Implementation plan has been developed for Pacific Northwest Laboratory's (PNL) Nuclear Facilities: 306W, 324, 325, 327 and 329NMF. It is based on a graded approach, self-assessment of the existing maintenance program(s) per the requirements specified by US Department of Energy (DOE) Order 4330.4A, Chapter II, Change number-sign 3. The results of this assessment were evaluated to determine needed improvements in PNL Craft Services' current maintenance program. The objective of this implementation plan is to provide baseline information for compliance to the DOE 4330.4A, and for needed improvements. The prime consideration in applying a graded approach to the Order has been to maintain safe and reliable operations, environmental compliance, safeguards and security, programmatic mission, facility preservation, and/or other facility-specific requirements. Using the results of the self-assessment, PNL has selected nine of the 18 elements of the Maintenance Program defined by DOE Order 4330.4A for improvement. The elements selected for improvement are Training and Qualification of Maintenance Personnel; Maintenance Procedures; Planning, Scheduling, and Coordination of Maintenance; Control of Maintenance Activities; Post-Maintenance Testing; Facility Condition Inspection; Management Involvement; Maintenance History; and Additional Maintenance Requirements. Based upon graded approach and current funding, those elements considered most important have been selected as goals for earliest compliance. Commitment dates for these elements have been established for compliance. The remaining elements of noncompliance will be targeted for implementation during later budget periods

  14. Mechanical configuration and maintenance

    International Nuclear Information System (INIS)

    Brown, T.G.; Casini, G.; Churakov, G.F.

    1982-01-01

    The INTOR engineering design has been strongly influenced by considerations for assembly and maintenance. A maintenance philosophy was established at the outset of the conceptual design to insure that the tokamak configuration would be developed to accommodate maintenance requirements. The main features of the INTOR design are summarized in this paper with primary emphasis on the impact of maintenance considerations. The most apparent configuration design feature is the access provided for torus maintenance. Particular attention was given to the size and location of superconducting magnets and the location of vacuum boundaries. All of the poloidal field (PF) coils are placed outside of the bore of the toroidal field (TF) coils and located above and below an access opening between adjacent TF coils through which torus sectors are removed. A magnet structural configuration consisting of mechanically attached reinforcing members has been designed which facilitates the open access space for torus sector removal. For impurity control, a single null poloidal divertor was selected over a double null design in order to maintain sufficient access for pumping and maintenance of the collector. A double null divertor was found to severely limit access to the torus with the addition of divertor collectors and pumping at the top. For this reason, a single null concept was selected in spite of the more difficult design problems associated with the required asymmetric PF system and higher particle loadings

  15. MOVES: A knowledge-based system for maintenance planning for motor-operated valves

    International Nuclear Information System (INIS)

    Winter, M.

    1987-01-01

    Over the past several years, knowledge-based expert systems have emerged as an important part of the general research area known as artificial intelligence. This paper describes a cooperative effort between faculty members at Iowa State University and engineers at the Duane Arnold Energy Center [a 545-MW(electric) boiling water reactor operated by Iowa Electric Light and Power Company] to explore the development of an advisory system for valve maintenance planning. This knowledge-based program, known as Motor-Operated Valves Expert System (MOVES), has a data base that currently includes safety-related motor-operated valves (∼117 valves). Valve maintenance was selected as the subject for the expert system because of the importance of valves in nuclear plant and their impact of plant availability. MOVES is being developed using the microcomputer-(IBM compatible) based expert system tool INSIGHT2+. The authors have found that the project benefits both the university and the utility

  16. AUTOMOTIVE DIESEL MAINTENANCE 1. UNIT XX, CUMMINS DIESEL ENGINE, MAINTENANCE SUMMARY.

    Science.gov (United States)

    Minnesota State Dept. of Education, St. Paul. Div. of Vocational and Technical Education.

    THIS MODULE OF A 30-MODULE COURSE IS DESIGNED TO PROVIDE A SUMMARY OF THE REASONS AND PROCEDURES FOR DIESEL ENGINE MAINTENANCE. TOPICS ARE WHAT ENGINE BREAK-IN MEANS, ENGINE BREAK-IN, TORQUING BEARINGS (TEMPLATE METHOD), AND THE NEED FOR MAINTENANCE. THE MODULE CONSISTS OF A SELF-INSTRUCTIONAL BRANCH PROGRAMED TRAINING FILM "CUMMINS DIESEL ENGINE…

  17. 75 FR 4099 - Maintenance Wage Rate Wage Recommendation and Maintenance Wage Survey; Report of Additional...

    Science.gov (United States)

    2010-01-26

    ... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5376-N-06] Maintenance Wage Rate Wage Recommendation and Maintenance Wage Survey; Report of Additional Classification and Wage Rate AGENCY: Office of... proposal. The information is used by HUD to determine or adopt prevailing wage rates for maintenance...

  18. 75 FR 37457 - Maintenance Wage Rate Wage Recommendation and Maintenance Wage Survey; Report of Additional...

    Science.gov (United States)

    2010-06-29

    ... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5376-N-54] Maintenance Wage Rate Wage Recommendation and Maintenance Wage Survey; Report of Additional Classification and Wage Rate AGENCY: Office of... proposal. The information is used by HUD to determine or adopt prevailing wage rates for maintenance...

  19. On-power fuelling machine of Dhruva research reactor: An indigenous effort (Paper No. 043)

    International Nuclear Information System (INIS)

    Rao, T.K.; Andhansare, M.G.

    1987-02-01

    On-power fuelling machine of Dhruva Research Reactor has been indigenously designed, manufactured, installed and commissioned. This is being used for fuelling of Dhruva Research reactor regularly since June 1985. This paper deals with the developmental efforts made during design and manufacture for meeting the functional requirements of the fuelling machine. This paper also highlights the special features of the components like servo valves, hydraulic motors, S.S. bellows, bearings, roller chains, solenoid valves etc. needed for reliable operation and maintenance of the fuelling machine whose down time should be minimum to achieve maximum reactor availability. (author). 17 figs

  20. Building Maintenance Management System for Heritage Museum

    Directory of Open Access Journals (Sweden)

    Md Azree Othuman Mydin

    2012-09-01

    Full Text Available An investment in the building maintenance aspect is massive throughout the world. In most of the countries, it signifies approximately 50% of the entire revenue of the construction industry. The value of buildings depends on the eminence of the maintenance invested in them. Maintenance management engages obtaining utmost advantage from the investment made on the maintenance activities. At the moment, maintenance in buildings in Malaysia is on the increase in spite of size, category, location, and ownership. This study focuses on Building Maintenance Management System for Heritage Museum, which consists of two case studies in Penang State Museum and Art Gallery, Malaysia and Museum of Perak, Malaysia. The aim of this study is to propose methods to improve the maintenance management system for heritage museum. From the results, the common problem occurs during the implementation for the maintenance of each building is the budget for the maintenance and worker’s skill. The department of each museum must have their own maintenance unit to keep an eye on the maintenance activities for their buildings in order to improve the maintenance management system in their building.

  1. Unsurfaced Road Maintenance Management

    Science.gov (United States)

    1992-12-01

    This draft manual describes an unsurfaced road maintenance management system for use on military installations. This system is available in either a manual or computerized mode (Micro PAVER). The maintenance standards prescribed should protect Govern...

  2. Remote maintenance development for ITER

    International Nuclear Information System (INIS)

    Tada, Eisuke; Shibanuma, Kiyoshi

    1998-01-01

    This paper describes the overall ITER remote maintenance design concept developed mainly for in-vessel components such as diverters and blankets, and outlines the ITER R and D program to develop remote handling equipment and radiation hard components. Reactor structures inside the ITER cryostat must be maintained remotely due to DT operation, making remote handling technology basic to reactor design. The overall maintenance scenario and design concepts have been developed, and maintenance design feasibility, including fabrication and testing of full-scale in-vessel remote maintenance handling equipment and tool, is being verified. (author)

  3. Remote maintenance development for ITER

    Energy Technology Data Exchange (ETDEWEB)

    Tada, Eisuke [Japan Atomic Energy Research Inst., Tokai, Ibaraki (Japan). Tokai Research Establishment; Shibanuma, Kiyoshi

    1998-04-01

    This paper describes the overall ITER remote maintenance design concept developed mainly for in-vessel components such as diverters and blankets, and outlines the ITER R and D program to develop remote handling equipment and radiation hard components. Reactor structures inside the ITER cryostat must be maintained remotely due to DT operation, making remote handling technology basic to reactor design. The overall maintenance scenario and design concepts have been developed, and maintenance design feasibility, including fabrication and testing of full-scale in-vessel remote maintenance handling equipment and tool, is being verified. (author)

  4. Maintenance of nuclear power plants

    International Nuclear Information System (INIS)

    Migaud, D.; Hutin, J.P.; Jouette, I.; Eymond, P.; Devie, P.; Cudelou, C.; Magnier, S.; Frydman, M.

    2016-01-01

    This document gathers different articles concerning the maintenance of the French nuclear power plants. The first article analyses the impact of the recent law on the energetic transition that sets the share of nuclear power at 50% of the electricity produced by 2025. A consequence may be the decommissioning of 17 to 20 reactors by 2025 and the huge maintenance program called 'Grand Carenage' whose aim is to extend operating life over 40 years will have to be re-considered in order to avoid useless expenses. The second article shows that in 2015 the French nuclear reactor fleet got very good results in terms of availability and safety. There were 49 scheduled outages and among them some ended ahead of time. The third article describes the specificities of the maintenance of a nuclear power plant, for instance the redundancy of some systems implies that maintenance has to deal with systems that have never functioned but must be ready to operate at any moment. Another specificity is the complexity of a nuclear power plant that implies an essential phase of preparation for maintenance operations. Because of safety requirements any maintenance operation has to be controlled, checked and may provide feedback. The fourth article presents the 'Grand Carenage' maintenance program that involves the following operations: the replacement of steam generators, the re-tubing of condensers, the replacement of the filtering drums used for cooling water, the testing of the reactor building, the hydraulic test of the primary circuit and the inspection of the reactor vessel. The fifth article focuses on the organization of the work-site for maintenance operations and the example of the Belleville-sur-Loire is described in the sixth article. Important maintenance operations like 'Grand Carenage' requires a strong collaboration with a network of specialized enterprises and as no reactor (except Flamanville EPR) is being built in France, maintenance

  5. Maintenance manual. Vol. 1. Maintenance management; 2. completely rev. ed.; Handbuch Instandhaltung. Bd. 1. Instandhaltungsmanagement

    Energy Technology Data Exchange (ETDEWEB)

    Warnecke, H.J. [ed.] [Fraunhofer-Institut fuer Produktionstechnik und Automatisierung (IPA), Stuttgart (Germany)

    1992-12-31

    This manual is the second, completely revised edition of the standard manual ``Maintenance - Fundamentals``, which was first published in 1981. It presents an outline of all relevant fields of maintenance today and contains practical information on new and established methods of maintenance management and technology. With its comprehensive concept, which addresses any industrial enterprise that wants to remain competitive, the manual is indispensable for maintenance managers in industry, service enterprises and consultancies. Vol.1, ``Maintenance Management``, informs the reader on fundamentals, design with a view to maintenance, organisation of maintenance work, personnel management, industrial safety and economic aspects of maintenance. Current issues such as product liability, electronic data processing, expert systems, environmental protection, controlling based on characteristic data, etc. are gone into. Graphical representations, concrete procedural information and exemplary solutions may be used directly as working tools for the practice of maintenance. (orig.) [Deutsch] Das vorliegende Handbuch ist die zweite, voellig ueberarbeitete und erweiterte Auflage des Standardwerkes ``Instandhaltung - Grundlagen``, das 1981 erstmals erschien. Es gibt einen Ueberblick ueber alle relevanten Gebiete einer modernen Instandhaltung und vermittelt praxisnahes Wissen ueber neue und bewaehrte Methoden und Verfahren des Instandhaltungsmanagements und der Instandhaltungstechnik. Mit dieser umfassenden Konzeption, die auf die Belange des im Wettbewerb stehenden Industriebetriebes ausgerichtet ist, wendet sich das Handbuch an die Fuehrungskraefte der Instandhaltung in der Industrie sowie an Dienstleistungs- und Beratungsunternehmen. Im Band 1 ``Instandhaltungsmanagement`` kann sich der Leser ueber Grundlagen, instandhaltungsgerechtes Konstruieren, Organisation der Instandhaltung, Personalmanagement, Arbeitssicherheit sowie Wirtschaftlichkeit der Instandhaltung informieren

  6. Winter maintenance performance measure.

    Science.gov (United States)

    2016-01-01

    The Winter Performance Index is a method of quantifying winter storm events and the DOTs response to them. : It is a valuable tool for evaluating the States maintenance practices, performing post-storm analysis, training : maintenance personnel...

  7. Space Telescope maintenance and refurbishment

    Science.gov (United States)

    Trucks, H. F.

    1983-01-01

    The Space Telescope (ST) represents a new concept regarding spaceborne astronomical observatories. Maintenance crews will be brought to the orbital worksite to make repairs and replace scientific instruments. For major overhauls the telescope can be temporarily returned to earth with the aid of the Shuttle. It will, thus, be possible to conduct astronomical studies with the ST for two decades or more. The five first-generation scientific instruments used with the ST include a wide field/planetary camera, a faint object camera, a faint object spectrograph, a high resolution spectrograph, and a high speed photometer. Attention is given to the optical telescope assembly, the support systems module, aspects of mission and science operations, unscheduled maintenance, contingency orbital maintenance, planned on-orbit maintenance, ground maintenance, ground refurbishment, and ground logistics.

  8. Development of divertor remote maintenance system

    Energy Technology Data Exchange (ETDEWEB)

    Takeda, Nobukazu; Oka, Kiyoshi; Akou, Kentaro; Takiguchi, Yuji [Japan Atomic Energy Research Inst., Tokai, Ibaraki (Japan). Tokai Research Establishment

    1998-04-01

    The ITER divertor is categorized as a scheduled maintenance component because of extreme heat and particle loads it is exposed to by plasma. It is also highly activated by 14 MeV neutrons. Reliable remote handling equipment and tools are required for divertor maintenance under intense gamma radiation. To facilitate remote maintenance, the divertor is segmented into 60 cassettes, and each cassette weighing about 25 tons and maintained and replaced through four maintenance ports each 90 degrees. Divertor cassettes must be transported toroidally and radially for replacement through maintenance ports. Remote handling involving cassette movers and carriers for toroidal and radial transport has been developed. Under the ITER R and D program, technology critical to divertor cassette maintenance is being developed jointly by Japan, E.U., and U.S. home teams. This paper summarizes divertor remote maintenance design and the status of technology development by the Japan Home Team. (author)

  9. Development of divertor remote maintenance system

    International Nuclear Information System (INIS)

    Takeda, Nobukazu; Oka, Kiyoshi; Akou, Kentaro; Takiguchi, Yuji

    1998-01-01

    The ITER divertor is categorized as a scheduled maintenance component because of extreme heat and particle loads it is exposed to by plasma. It is also highly activated by 14 MeV neutrons. Reliable remote handling equipment and tools are required for divertor maintenance under intense gamma radiation. To facilitate remote maintenance, the divertor is segmented into 60 cassettes, and each cassette weighing about 25 tons and maintained and replaced through four maintenance ports each 90 degrees. Divertor cassettes must be transported toroidally and radially for replacement through maintenance ports. Remote handling involving cassette movers and carriers for toroidal and radial transport has been developed. Under the ITER R and D program, technology critical to divertor cassette maintenance is being developed jointly by Japan, E.U., and U.S. home teams. This paper summarizes divertor remote maintenance design and the status of technology development by the Japan Home Team. (author)

  10. Optimizing preventive maintenance

    International Nuclear Information System (INIS)

    DiCola, F.E.

    1988-01-01

    The traditional approach to preventive maintenance (PM) is based on adherence to manufacturers's requirements and recommended frequencies. When equipment fails, either new procedures are established or the frequency is increased. This leads to an increase in the number of PM activities, overloading not only maintenance resources, but support as well. There is no correlation between more PM and an increase in equipment reliability. More PM may actually induce failures. Reliability-centered maintenance, a new concept in utility maintenance, is based on identifying system/subsystem functions, failures, and dominant failure modes to develop or revise PM tasks. The activities described in this paper are based on actual implementation of this concept on an ongoing project to upgrade the PM program at one of the largest electric utilities in the country. Optimum PM activities are those that, when implemented, will minimize factors that c cause equipment to fail. One technique described illustrates how equipment performance, failure modes, and causes can be related to minimize the occurrence of failures. Operating history and service life of a component are key factors in determining the most effective PM activities, provided that the factors are related to failure modes and causes

  11. Maintenance training centre at NPP Paks, Hungary

    International Nuclear Information System (INIS)

    Babos, K.

    1996-01-01

    The lecture shows the feature of WWER-440/213 units maintenance, the existing maintenance training system, the necessity of the change in maintenance training system at NPP Paks. The author introduces the would-be maintenance training centre, the training facilities and the main tasks related to the maintenance training. (author)

  12. Application of reliability centered maintenance for nuclear power station in Japan

    International Nuclear Information System (INIS)

    Kumano, Haruyuki; Honda, Hironobu.

    1990-01-01

    The reliability centered maintenance (RCM) method has been widely used with good results in aviation companies in the U.S. to ensure positive preventive maintenance and management. In addition, the Electric Power Research Institute has been making studies and tests in an effort to apply the RCM method to nuclear power plants. The present report shows and discusses some results of a preliminary study aimed at the introduction of the RCM method to nuclear power plants in Japan. The history of the development and application of RCM is outlined first, and the procedure of its implementation is then described and discussed. The procedure consists of five major steps: collection of data, identification of system components, analysis of the functions of the system, selection of required tasks for preventive management, and packaging. Some actual examples of the application of RCM to nuclear power plants in the U.S. are described. And finally, the report discusses some major problems to be solved to permit the application of RCM to nuclear power plants in Japan. (N.K.)

  13. Maintenance Support System Development for Maintenance Personnel in Nuclear Power Plants

    International Nuclear Information System (INIS)

    Yim, Ho Bin; Kim, In; Lee, Seung Min; Seong, Poong Hyun

    2009-01-01

    As plants or factories get old, the number of maintenance activities increases, and so does the necessity of maintenance itself. Industries have adopted the latest technologies such as RFID, wireless sensor networking, and augmented reality to develop systems which increase human performances as well as productivity. Due to safety related concerns, nuclear power industries have been reluctant to use these fancy technologies. However, from the economics point of view, it is necessary to take advantages of novel technologies. This empirical study considers not only ergonomics view, but also the economics view when building maintenance support systems. This paper introduces brief features of five subsystems which were built to reduce human errors and advantages when each system successfully reduces those human errors

  14. Maintenance Support System Development for Maintenance Personnel in Nuclear Power Plants

    Energy Technology Data Exchange (ETDEWEB)

    Yim, Ho Bin; Kim, In; Lee, Seung Min; Seong, Poong Hyun [Korea Advanced Institute of Science and Technology, Daejeon (Korea, Republic of)

    2009-05-15

    As plants or factories get old, the number of maintenance activities increases, and so does the necessity of maintenance itself. Industries have adopted the latest technologies such as RFID, wireless sensor networking, and augmented reality to develop systems which increase human performances as well as productivity. Due to safety related concerns, nuclear power industries have been reluctant to use these fancy technologies. However, from the economics point of view, it is necessary to take advantages of novel technologies. This empirical study considers not only ergonomics view, but also the economics view when building maintenance support systems. This paper introduces brief features of five subsystems which were built to reduce human errors and advantages when each system successfully reduces those human errors.

  15. Space station orbit maintenance

    Science.gov (United States)

    Kaplan, D. I.; Jones, R. M.

    1983-01-01

    The orbit maintenance problem is examined for two low-earth-orbiting space station concepts - the large, manned Space Operations Center (SOC) and the smaller, unmanned Science and Applications Space Platform (SASP). Atmospheric drag forces are calculated, and circular orbit altitudes are selected to assure a 90 day decay period in the event of catastrophic propulsion system failure. Several thrusting strategies for orbit maintenance are discussed. Various chemical and electric propulsion systems for orbit maintenance are compared on the basis of propellant resupply requirements, power requirements, Shuttle launch costs, and technology readiness.

  16. Nuclear power plants maintenance

    International Nuclear Information System (INIS)

    Anon.

    1988-01-01

    Nuclear power plants maintenance now appears as an important factor contributing to the competitivity of nuclea energy. The articles published in this issue describe the way maintenance has been organized in France and how it led to an actual industrial activity developing and providing products and services. An information note about Georges Besse uranium enrichment plant (Eurodif) recalls that maintenance has become a main data not only for power plants but for all nuclear industry installations. (The second part of this dossier will be published in the next issue: vol. 1 January-February 1989) [fr

  17. A STEPPING STONE TOWARDS KNOWLEDGE BASED MAINTENANCE

    Directory of Open Access Journals (Sweden)

    G. Waeyenbergh

    2012-01-01

    Full Text Available Maintenance decision making becomes more and more a management concern. Some decades ago, maintenance was still often considered as an unavoidable side effect of production. The perception of maintenance has evolved considerably. One of the current issues is the maintenance concept, being the mix of maintenance interventions and the general framework for determining this mix. In this paper we describe a modular framework, called Knowledge Based Maintenance, for developing a customised maintenance concept. After describing the general framework and its decision support use, some case experiences are given. This experience covers some elements of the proposed framework.

  18. Remote maintenance development for ITER

    International Nuclear Information System (INIS)

    Tada, Eisuke; Shibanuma, Kiyoshi

    1997-01-01

    This paper both describes the overall design concept of the ITER remote maintenance system, which has been developed mainly for use with in-vessel components such as divertor and blanket, and outlines of the ITER R and D program, which has been established to develop remote handling equipment/tools and radiation hard components. In ITER, the reactor structures inside cryostat have to be maintained remotely because of activation due to DT operation. Therefore, remote-handling technology is fundamental, and the reactor-structure design must be made consistent with remote maintainability. The overall maintenance scenario and design concepts of the required remote handling equipment/tools have been developed according to their maintenance classification. Technologies are also being developed to verify the feasibility of the maintenance design and include fabrication and testing of a fullscale remote-handling equipment/tools for in-vessel maintenance. (author)

  19. Lean thinking for a maintenance process

    Directory of Open Access Journals (Sweden)

    Sherif Mostafa

    2015-01-01

    Full Text Available The maintenance process shares significant operating costs in an organisation. Lean thinking can be incorporated into maintenance activities through applying its principles and practices/tools. Lean maintenance (LM is a prerequisite for lean manufacturing systems. This research proposes a new structure for LM process based on a systematic literature review of a significant number of related articles that were published on LM. The process structure is designed based on the five lean principles to guide and support organisations to pursue maintenance excellence. This study establishes a scheme for LM tools that are structured into 2 level 4 bundles and 26 lean practices/tools and develops a House of Waste (HoW to demonstrate the association between maintenance wastes and the LM tools. With a successful accomplishment of the proposed scheme, the performance of a maintenance department can create more improvement opportunities over time to reach the maintenance excellence status.

  20. Attitudes towards Prosthodontic Clinical Decision-Making for Edentulous Patients among South West Deanery Dental Foundation Year One Dentists

    Directory of Open Access Journals (Sweden)

    Andrew Barber

    2016-05-01

    Full Text Available The aim of this study was to describe Dental Foundation year one dentists’ attitudes towards prosthodontic decision making for edentulous patients, and identify whether there are gender differences in these attitudes. All South West Deanery trainees were invited to take part in the study between May and June 2011 and a previously piloted questionnaire was administered to the trainees by their training programme directors. The questionnaire posed questions based upon a clinical scenario of discussing treatment options with patients. Seventy-two questionnaires were used in the analysis (91% overall response rate. Trainees perceived their own values to be less important than the patient’s values (p < 0.001 in decision making, but similar to the patient’s friend’s/relative’s values (p = 0.1. In addition, the trainees perceived the patient’s values to be less important than their friend’s/relatives (p < 0.001. Sixty-six per cent of trainees acknowledged an influence from their own personal values on their presentation of material to patients who are in the process of choosing among different treatment options, and 87% thought their edentulous patients were satisfied with the decision making process when choosing among different treatment options. Fifty-eight per cent of trainees supported a strategy of negotiation between patients and clinicians (shared decision making. There was no strong evidence to suggest gender had an influence on the attitudes towards decision making. The finding of a consensus towards shared decision making in the attitudes of trainees, and no gender differences is encouraging and is supportive of UK dental schools’ ability to foster ethical and professional values among dentists.

  1. Developing optimized prioritizing road maintenance

    Directory of Open Access Journals (Sweden)

    Ewadh Hussein Ali

    2018-01-01

    Full Text Available Increased demand for efficient maintenance of the existing roadway system needs optimal usage of the allocated funds. The paper demonstrates optimized methods for prioritizing maintenance implementation projects. A selected zone of roadway system in Kerbala city represents the study area to demonstrate the application of the developed prioritization process. Paver system PAVER integrated with GIS is used to estimate and display the pavement condition index PCI, thereby to establish a priority of maintenance. In addition to simple ranking method by PCI produced by the output of PAVER, the paper introduces PCI measure for each section of roadway. The paper introduces ranking by multiple measures investigated through expert knowledge about measures that affect prioritization and their irrespective weights due to a predesigned questionnaire. The maintenance priority index (MPI is related to cost of suitable proposed maintenance, easiness of proposed maintenance, average daily traffic and functional classification of the roadway in addition to PCI. Further, incremental benefit-cost analysis ranking provide an optimized process due to benefit and cost of maintenance. The paper introduces efficient display of layout and ranking for the selected zone of roadway system based on MPI index and incremental BCR method. Although the two developed methods introduce different layout display for priority, statistical test shows that no significant difference between ranking of all methods of prioritization.

  2. 340 Facility maintenance implementation plan

    International Nuclear Information System (INIS)

    1995-03-01

    This Maintenance Implementation Plan (MIP) has been developed for maintenance functions associated with the 340 Facility. This plan is developed from the guidelines presented by Department of Energy (DOE) Order 4330.4B, Maintenance Management Program (DOE 1994), Chapter II. The objective of this plan is to provide baseline information for establishing and identifying Westinghouse Hanford Company (WHC) conformance programs and policies applicable to implementation of DOE order 4330.4B guidelines. In addition, this maintenance plan identifies the actions necessary to develop a cost-effective and efficient maintenance program at the 340 Facility. Primary responsibility for the performance and oversight of maintenance activities at the 340 Facility resides with Westinghouse Hanford Company (WHC). Maintenance at the 340 Facility is performed by ICF-Kaiser Hanford (ICF-KH) South Programmatic Services crafts persons. This 340 Facility MIP provides interface requirements and responsibilities as they apply specifically to the 340 Facility. This document provides an implementation schedule which has been developed for items considered to be deficient or in need of improvement. The discussion sections, as applied to implementation at the 340 Facility, have been developed from a review of programs and practices utilizing the graded approach. Biennial review and additional reviews are conducted as significant programmatic and mission changes are made. This document is revised as necessary to maintain compliance with DOE requirements

  3. 340 Facility maintenance implementation plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-03-01

    This Maintenance Implementation Plan (MIP) has been developed for maintenance functions associated with the 340 Facility. This plan is developed from the guidelines presented by Department of Energy (DOE) Order 4330.4B, Maintenance Management Program (DOE 1994), Chapter II. The objective of this plan is to provide baseline information for establishing and identifying Westinghouse Hanford Company (WHC) conformance programs and policies applicable to implementation of DOE order 4330.4B guidelines. In addition, this maintenance plan identifies the actions necessary to develop a cost-effective and efficient maintenance program at the 340 Facility. Primary responsibility for the performance and oversight of maintenance activities at the 340 Facility resides with Westinghouse Hanford Company (WHC). Maintenance at the 340 Facility is performed by ICF-Kaiser Hanford (ICF-KH) South Programmatic Services crafts persons. This 340 Facility MIP provides interface requirements and responsibilities as they apply specifically to the 340 Facility. This document provides an implementation schedule which has been developed for items considered to be deficient or in need of improvement. The discussion sections, as applied to implementation at the 340 Facility, have been developed from a review of programs and practices utilizing the graded approach. Biennial review and additional reviews are conducted as significant programmatic and mission changes are made. This document is revised as necessary to maintain compliance with DOE requirements.

  4. Maintenance for the Millennium: Another Approach

    International Nuclear Information System (INIS)

    Sculthorpe, Barruy R.

    2002-01-01

    Nuclear units nationwide are struggling to increase plant reliability and availability while at the same time reduce their operating and maintenance costs. Some very costly investments have been made in programs such as Reliability Centered Maintenance [RCM]. Florida Power and Light's approach at the St. Lucie Nuclear Plant has taken a slightly different approach. Building on our knowledge of the RCM process and an already existing 'World Class' Predictive Maintenance Program, a 'Condition-Based' Maintenance Program that takes advantage of the RCM philosophy and our toolbox full of advanced and highly successful predictive maintenance technologies. These tools currently consist of vibration analysis, lubricant analysis (both physical property and wear metals analysis, thermographic analysis, motor current signature analysis, tribology and process parameter trending. All employed with the intent to evaluate a machines health. This machine health check allows the forecasting of future preventative maintenance [PM's] tasks and the revision of existing PM's to maximize machine performance and eliminate 'no-value-added' maintenance activities/costs. Within the last year, the Condition-Based Maintenance Program has produced a cost saving of approximately $1.5 million dollars. As the program matures, these cost savings will accumulate well into the millennium. (authors)

  5. Reliability-based maintenance evaluations and standard preventive maintenance programs

    International Nuclear Information System (INIS)

    Varno, M.; McKinley, M.

    1993-01-01

    Due to recent issuance of 10CFR50.65, the U.S. Nuclear Regulatory Commission maintenance rule (Rule), and the open-quotes Industry Guideline for Monitoring the Effectiveness of Maintenance at Nuclear Power Plantsclose quotes prepared by the Nuclear Management and Resources Council, many utilities are undertaking review or evaluation of current preventive maintenance (PM) programs. Although PM optimization and documentation are not specifically required by the Rule, an appropriate and effective PM program (PMP) will be the cornerstone of the successful and cost-effective implementation of the Rule. Currently, a project is being conducted at the Vermont Yankee Nuclear Power Station (VYNPS) in conjunction with Quadrex Energy Services to evaluate, optimize, and document the PMP. The project began in March 1993 and is scheduled for completion in mid-1995. The initial scope for the project is the evaluation of those structures, systems, and components that are within the scope of the Rule. Because of the number of systems to be evaluated (∼50), the desired completion schedule, and cost considerations, a streamlined approach to PM optimization and documentation is being utilized

  6. Development of a mechanical maintenance training simulator in OpenSimulator for F-16 aircraft engines

    OpenAIRE

    Pinheiro, André; Fernandes, Paulo; Maia, Ana; Cruz, Gonçalo; Pedrosa, Daniela; Fonseca, Benjamim; Paredes, Hugo; Martins, Paulo; Morgado, Leonel; Rafael, Jorge

    2014-01-01

    Mechanical maintenance of F-16 engines is carried out as a team effort involving 3–4 skilled engine technicians, but the details of its procedures and requisites change constantly, to improve safety, optimize resources, and respond to knowledge learned from field outcomes. This provides a challenge for development of training simulators, since simulated actions risk becoming obsolete rapidly and require costly reimplementation. This paper presents the development of a 3D mechanical maintenanc...

  7. Nuclear maintenance strategy and first steps for preliminary maintenance plan of the EU HCLL & HCPB Test Blanket Systems

    Energy Technology Data Exchange (ETDEWEB)

    Galabert, Jose, E-mail: jose.galabert@f4e.europa.eu [F4E Fusion for Energy, EU Domestic Agency, c/Josep Pla, 2. B3, 08019, Barcelona (Spain); Hopper, Dave [AMEC Foster Wheeler, Faraday Street, Birchwood Park, WA3 6GN (United Kingdom); Neviere, Jean-Cristophe [ITER Organization, Route de Vinon-sur-Verdon, CS 90046, 13067, St. Paul Lez Durance Cedex (France); Nodwell, David [CCFE, Culham Science Centre, Abingdon, OX14 3DB, Oxfordshire (United Kingdom); Pascal, Romain [ITER Organization, Route de Vinon-sur-Verdon, CS 90046, 13067, St. Paul Lez Durance Cedex (France); Poitevin, Yves; Ricapito, Italo [F4E Fusion for Energy, EU Domestic Agency, c/Josep Pla, 2. B3, 08019, Barcelona (Spain); White, Gareth [AMEC Foster Wheeler, Faraday Street, Birchwood Park, WA3 6GN (United Kingdom)

    2017-03-15

    Highlights: • Nuclear maintenance strategy for the two European (EU) Test Blanket Systems (TBS): i/. Helium Cooled Lead Lithium (HCLL) and ii/. Helium Cooled Pebble Bed (HCPB). • Preliminary identification of maintenance tasks for most relevant components of the EU HCLL & HCPB TBS. • Preliminary feasibility analysis for hands-on maintenance tasks of some relevant components of the European Test Blanket Systems. • Design recommendations for enhancement of the European Test Blanket Systems maintainability. - Abstract: This paper gives an overview of nuclear maintenance strategy to be followed for the European HCLL & HCPB Test Blanket Systems (TBS) to be installed in ITER. One of the several core documents to prepare in view of their licensing is their respective ‘Maintenance Plan’. This document is fundamental for ensuring sound performance and safety of the TBS during ITER’s operational phase and shall include, amongst others, relevant information on: maintenance organization, preventive and corrective maintenance task procedures, condition monitoring for key components, maintenance work planning, and a spare parts plan, just to mention some of the key topics. In compliance with the ITER Plant Maintenance policy, first steps have been taken aimed at defining nuclear maintenance strategy for some of the most relevant HCLL & HCPB TBS components, conducted by F4E in collaboration with industry. After a brief recall of maintenance strategy of the TBM Program (PBS-56), this paper analyses main features of EU HCLL & HCPB TBS maintainability and identifies, at their conceptual design phase, a preliminary list of maintenance tasks to be developed for their most representative components. In addition, the paper also presents the first nuclear maintenance studies conducted for replacement of the Q{sub 2} Getter Beds, identifying some design recommendations for their sound maintainability.

  8. Nuclear maintenance strategy and first steps for preliminary maintenance plan of the EU HCLL & HCPB Test Blanket Systems

    International Nuclear Information System (INIS)

    Galabert, Jose; Hopper, Dave; Neviere, Jean-Cristophe; Nodwell, David; Pascal, Romain; Poitevin, Yves; Ricapito, Italo; White, Gareth

    2017-01-01

    Highlights: • Nuclear maintenance strategy for the two European (EU) Test Blanket Systems (TBS): i/. Helium Cooled Lead Lithium (HCLL) and ii/. Helium Cooled Pebble Bed (HCPB). • Preliminary identification of maintenance tasks for most relevant components of the EU HCLL & HCPB TBS. • Preliminary feasibility analysis for hands-on maintenance tasks of some relevant components of the European Test Blanket Systems. • Design recommendations for enhancement of the European Test Blanket Systems maintainability. - Abstract: This paper gives an overview of nuclear maintenance strategy to be followed for the European HCLL & HCPB Test Blanket Systems (TBS) to be installed in ITER. One of the several core documents to prepare in view of their licensing is their respective ‘Maintenance Plan’. This document is fundamental for ensuring sound performance and safety of the TBS during ITER’s operational phase and shall include, amongst others, relevant information on: maintenance organization, preventive and corrective maintenance task procedures, condition monitoring for key components, maintenance work planning, and a spare parts plan, just to mention some of the key topics. In compliance with the ITER Plant Maintenance policy, first steps have been taken aimed at defining nuclear maintenance strategy for some of the most relevant HCLL & HCPB TBS components, conducted by F4E in collaboration with industry. After a brief recall of maintenance strategy of the TBM Program (PBS-56), this paper analyses main features of EU HCLL & HCPB TBS maintainability and identifies, at their conceptual design phase, a preliminary list of maintenance tasks to be developed for their most representative components. In addition, the paper also presents the first nuclear maintenance studies conducted for replacement of the Q_2 Getter Beds, identifying some design recommendations for their sound maintainability.

  9. Westinghouse Savannah River Company (WSRC) approach to nuclear facility maintenance

    International Nuclear Information System (INIS)

    Harrison, D.W.

    1991-01-01

    The Savannah River Site (SRS) in South Carolina is a 300+ square mile facility owned by the US Department of Energy (DOE) and operated by Westinghouse Savannah River Company (WSRC), the prime contractor; Bechtel Savannah River, Incorporated (BSRI) is a major subcontractor. The site has used all of the five nuclear reactors and it has the necessary nuclear materials processing facilities, as well as waste management and research facilities. The site has produced materials for the US nuclear arsenal and various isotopes for use in space research and nuclear medicine for more than 30 years. In 1989, WSRC took over as prime contractor, replacing E.I. du Pont de Nemours and Company. At this time, a concentrated effort began to more closely align the operating standards of this site with those accepted by the commercial nuclear industry of the United States. Generally, this meant acceptance of standards of the Institute of Nuclear Power Operations (INPO) for nuclear-related facilities at the site. The subject of this paper is maintenance of nuclear facilities and, therefore, excludes discussion of the maintenance of non-nuclear facilities and equipment

  10. Shuttle Repair Tools Automate Vehicle Maintenance

    Science.gov (United States)

    2013-01-01

    Successfully building, flying, and maintaining the space shuttles was an immensely complex job that required a high level of detailed, precise engineering. After each shuttle landed, it entered a maintenance, repair, and overhaul (MRO) phase. Each system was thoroughly checked and tested, and worn or damaged parts replaced, before the shuttle was rolled out for its next mission. During the MRO period, workers needed to record exactly what needed replacing and why, as well as follow precise guidelines and procedures in making their repairs. That meant traceability, and with it lots of paperwork. In 2007, the number of reports generated during electrical system repairs was getting out of hand-placing among the top three systems in terms of paperwork volume. Repair specialists at Kennedy Space Center were unhappy spending so much time at a desk and so little time actually working on the shuttle. "Engineers weren't spending their time doing technical work," says Joseph Schuh, an electrical engineer at Kennedy. "Instead, they were busy with repetitive, time-consuming processes that, while important in their own right, provided a low return on time invested." The strain of such inefficiency was bad enough that slow electrical repairs jeopardized rollout on several occasions. Knowing there had to be a way to streamline operations, Kennedy asked Martin Belson, a project manager with 30 years experience as an aerospace contractor, to co-lead a team in developing software that would reduce the effort required to document shuttle repairs. The result was System Maintenance Automated Repair Tasks (SMART) software. SMART is a tool for aggregating and applying information on every aspect of repairs, from procedures and instructions to a vehicle s troubleshooting history. Drawing on that data, SMART largely automates the processes of generating repair instructions and post-repair paperwork. In the case of the space shuttle, this meant that SMART had 30 years worth of operations

  11. Solar PV O&M Standards and Best Practices - Existing Gaps and Improvement Efforts

    Energy Technology Data Exchange (ETDEWEB)

    Klise, Geoffrey Taylor [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Balfour, John R. [High Performance PV, Phoenix, AZ (United States); Keating, T. J. [SunSpec Alliance, San Jose, CA (United States)

    2014-11-01

    As greater numbers of photovoltaic (PV) systems are being installed, operations & maintenance (O&M) activities will need to be performed to ensure the PV system is operating as designed over its useful lifetime. To mitigate risks to PV system availability and performance, standardized procedures for O&M activities are needed to ensure high reliability and long-term system bankability. Efforts are just getting underway to address the need for standard O&M procedures as PV gains a larger share of U.S. generation capacity. Due to the existing landscape of how and where PV is installed, including distributed generation from small and medium PV systems, as well as large, centralized utility-scale PV, O&M activities will require different levels of expertise and reporting, making standards even more important. This report summarizes recent efforts made by solar industry stakeholders to identify the existing standards and best practices applied to solar PV O&M activities, and determine the gaps that have yet to be, or are currently being addressed by industry.

  12. The ITER remote maintenance system

    International Nuclear Information System (INIS)

    Tesini, A.; Palmer, J.

    2008-01-01

    The aim of this paper is to summarize the ITER approach to machine components maintenance. A major objective of the ITER project is to demonstrate that a future power producing fusion device can be maintained effectively and offer practical levels of plant availability. During its operational lifetime, many systems of the ITER machine will require maintenance and modification; this can be achieved using remote handling methods. The need for timely, safe and effective remote operations on a machine as complex as ITER and within one of the world's most hostile remote handling environments represents a major challenge at every level of the ITER Project organization, engineering and technology. The basic principles of fusion reactor maintenance are presented. An updated description of the ITER remote maintenance system is provided. This includes the maintenance equipment used inside the vacuum vessel, inside the hot cell and the hot cell itself. The correlation between the functions of the remote handling equipment, of the hot cell and of the radwaste processing system is also described. The paper concludes that ITER has equipped itself with a good platform to tackle the challenges presented by its own maintenance and upgrade needs

  13. Prosthetic rehabilitation of patients with hypohidrotic ectodermal dysplasia: A systematic review.

    Science.gov (United States)

    Schnabl, D; Grunert, I; Schmuth, M; Kapferer-Seebacher, I

    2018-04-21

    Hypohidrotic ectodermal dysplasia (HED) comprises a large group of inherited disorders of ectodermal structures, characterised by hypo- or anhidrosis, hypotrichosis and hypo- or oligo- or anodontia. We aimed to systematically assess the spectrum of prosthodontic approaches with regard to the patients' age and to provide clinical implications for practicing dentists. An electronic and manual search was conducted in four databases (Medline, LIVIVO, Cochrane Library, Web of Science Core Collection). Publications of multiple study designs written in English or German without data restrictions, reporting on prosthodontic treatment of patients diagnosed with HED and afflicted with oligo- or anodontia, were included. In total, 75 articles on 146 patients were analysed according to the patients' age. In children aged 2-17 years, removable full or partial (over)dentures represented standard treatment. In the mandible, implant-supported removable dentures on two interforaminal implants presented an alternative, already in young childhood. In cases with more than six teeth per jaw, also fixed (resin) bridges were used, frequently after orthodontic treatment. In adults, fixed or removable reconstructions with the help of up to eight implants per jaw, usually placed after bone augmentation procedures, were standard. Ten case reports/series with long-term follow-up illustrated the need for consistent maintenance including denture renewals. Prosthodontic rehabilitation should start in early childhood and needs to be revised in accordance with the patients' growth. Treatment should be carried out by a multidisciplinary team addressing variable demands in different age groups. © 2018 John Wiley & Sons Ltd.

  14. Digital maintenance field technology for the maintenance of nuclear power plant

    International Nuclear Information System (INIS)

    Sato, Tomomasa; Asama, Hajime; Kita, Nobuyuki; Numano, Masayoshi

    2002-01-01

    This paper proposes a concept of 'Digital Maintenance Field Technology', which enables human beings and working robots making fully use of the necessary information for maintenance activity not only in any location of the maintenance field (seamless in location) but also in any moment from the past to the future (seamless in time) and in any format in presenting to human (seamless in semantics). The paper points out the following three essential components of the technology: 1) 'Digital Field Construction Technology', 2) 'Digital Field Archival Technology' and 3) 'Digital Field Presentation Technology'. The necessary capabilities are extracted and our approaches and state of the art of realizing these capabilities are introduced in addition to present the state of the art of home application example. The future extension is also illustrated. (author)

  15. ANALYZING THE CONSUMER PROFILING FOR IMPROVING EFFORTS OF INTEGRATED MARKETING COMMUNICATION

    Directory of Open Access Journals (Sweden)

    Olimpia OANCEA

    2014-06-01

    Full Text Available In an economy with a strong concurential character, organizations must capitalize the integrated marketing communication in the most effective way, to ensure the creation and maintenance of long-term relationships with current and potential customers. Building and managing the relationships with customers can have a direct and favourable effect on the efficiency of an organization's communication efforts. The integrated marketing communication identifies with the nowadays market dynamics and learns the organizations how easy can be to prosper in an environment where changes occur in an alarming way. Therefore, the purpose of this paper is to analyze the socio-demographic profile of the consumers of bread in Arges County, as well as the preferences and purchasing behaviour at the level of the market segments identified using the K-Means Cluster Analysis method.

  16. Continuous improvement of operation and maintenance conditions of french PWR nuclear islands

    International Nuclear Information System (INIS)

    Bitsch, D.

    1985-05-01

    Improvement of the nuclear island design, to facilitate maintenance and working conditions during plant shutdown, has been a subject of particular attention within the French PWR program. Standardization and industrial concentration created an unusually favourable context for approaching this objective. Progress efforts supported by the feedback of actual operating experience were pursued in the areas of plant layout-equipment installation, and on the design and technology of the component themselves. The progress efforts on the design and technology of the components were pursued along several paths including: - the resistance increase of specific parts submitted to various forms of in-service damage, - the reduction of the extent and duration of work during plant outages and - the reduction of the Occupational Radiation Exposure (ORE), one of the most important axes of development, through the appropriate selection of less releasing materials, the implementation of more efficient decontamination systems and by the use of robots

  17. Strategy to maximize maintenance operation

    OpenAIRE

    Espinoza, Michael

    2005-01-01

    This project presents a strategic analysis to maximize maintenance operations in Alcan Kitimat Works in British Columbia. The project studies the role of maintenance in improving its overall maintenance performance. It provides strategic alternatives and specific recommendations addressing Kitimat Works key strategic issues and problems. A comprehensive industry and competitive analysis identifies the industry structure and its competitive forces. In the mature aluminium industry, the bargain...

  18. Maintenance evaluation using risk based criteria

    International Nuclear Information System (INIS)

    Torres Valle, A.

    1996-01-01

    The maintenance evaluation is currently performed by using economic and, in some case, technical equipment failure criteria, however this is done to a specific equipment level. In general, when statistics are used the analysis for maintenance optimization are made isolated and whit a post mortem character; The integration provided by mean of Probabilistic Safety assessment (PSA) together with the possibilities of its applications, allow for evaluation of maintenance on the basis of broader scope criteria in regard to those traditionally used. The evaluate maintenance using risk based criteria, is necessary to follow a dynamic and systematic approach, in studying the maintenance strategy, to allow for updating the initial probabilistic models, for including operational changes that often take place during operation of complex facilities. This paper proposes a dynamic evaluation system of maintenance task. The system is illustrated by means of a practical example

  19. Maintenance: problem and solution

    CERN Multimedia

    CERN Bulletin

    2012-01-01

    Equipment that is often unique, machines that are as old as the Laboratory, continuous and demanding performance requirements: these are the challenges faced by CERN’s accelerator maintenance teams. There are some twenty such teams, attached to different departments. A new project aims to standardise their procedures to make their work easier, and you can be a part of it.   “For the past year or so, the Accelerator and Technologies Sector and the GS Department have been working together on identifying the needs of the different teams that perform maintenance on CERN’s equipment. We are now ready to provide computer support with detailed specifics about the processes that need to be set up,” explains Goran Perinić, one of the leaders in CERN’s new Maintenance Management project (MMP). Since the LHC entered operation, the responsibilities of the technical teams have been broadened to cover maintenance of the collider and that of its injectors...

  20. Selecting Suitable Candidates for Predictive Maintenance

    NARCIS (Netherlands)

    Tiddens, Wieger Willem; Braaksma, Anne Johannes Jan; Tinga, Tiedo

    2018-01-01

    Predictive maintenance (PdM) or Prognostics and Health Management (PHM) assists in better predicting the future state of physical assets and making timely and better-informed maintenance decisions. Many companies nowadays ambition the implementation of such an advanced maintenance policy. However,

  1. RCM [reliability-centered maintenance] at Ginna: Preventive maintenance program optimization at year 20

    International Nuclear Information System (INIS)

    Edgar, E.C.

    1989-01-01

    The reliability-centered maintenance (RCM) program at Rochester Gas ampersand Electric Company's Ginna station is entering its second year. Of the 20 systems originally selected for evaluation, 10 are in various stages of completion, and recommendations resulting from the earliest systems studied are now being implemented. As expected, few major discoveries have been made in terms of preventive maintenance program failings or excesses. The performance of the now 20-yr-old plant has been excellent in recent years, and objectives focus more on ensuring continued high standards of safety, reliability, and economy than on maintenance program cost reduction

  2. Machine maintenance: the rules of the game

    CERN Multimedia

    Antonella Del Rosso

    2013-01-01

    GCO, GMIO, GSPO – ever heard of them? These acronyms stand for the “roles” that best practices identify as vital to successful maintenance management. CERN’s Maintenance Management Project (MMP) team is working with the technical departments to ensure that they implement these procedures when they deal with the maintenance of the collider and its injectors and infrastructure.   The participants of the workshop on asset and maintenance management (AMMW2013), which took place at CERN in November. Since its creation in 2012, CERN’s Maintenance Framework Implementation Office (MFIO) has been promoting the deployment of harmonised maintenance management methods across the BE, GS, EN and TE Departments. “The definition and identification of the Group Coding Officers (GCO), Group Maintenance Information Officers (GMIO) and Group Spare Part Officers (GSPO) are one of the best practices that should be adopted each time a maintenance programme...

  3. Condition based maintenance pilot projects at Pickering ND

    International Nuclear Information System (INIS)

    Zemdegs, R.T.

    1995-01-01

    Ontario Hydro has recognized that the approaches to maintenance have undergone significant changes to the past decades. The traditional break down maintenance approach has been replaced by preventative maintenance and more recently, by condition based maintenance. The nuclear plants of Ontario Hydro have evaluated on a number of alternative programs to improve their maintenance effectiveness and to reduce costs, including Reliability Centred Maintenance (RCM), call-up review, component-based PM programs, analysis of failure history and so on. Pickering ND (nuclear division) and Ontario Hydro's Nuclear Technologies Services Division, have embarked on a Condition Based Maintenance pilot project to address the above issues as a breakthrough solution for smarter maintenance. The Condition Based Maintenance pilot project will demonstrate an end-to-end process utilizing a Reliability Centred Maintenance structured approach to re-engineer and redefine the existing maintenance programs. The project emphasizes on-condition maintenance where justified, and utilizes an information management tool to provide the required records keeping and analysis infrastructure. This paper briefly describes the planned maintenance model at Pickering ND used to guide the CBM pilot, and an overview of the methodology used to develop on-condition equipment indicators as part of a re-engineered maintenance plan

  4. GRAPHICAL MODELS OF THE AIRCRAFT MAINTENANCE PROCESS

    OpenAIRE

    Stanislav Vladimirovich Daletskiy; Stanislav Stanislavovich Daletskiy

    2017-01-01

    The aircraft maintenance is realized by a rapid sequence of maintenance organizational and technical states, its re- search and analysis are carried out by statistical methods. The maintenance process concludes aircraft technical states con- nected with the objective patterns of technical qualities changes of the aircraft as a maintenance object and organizational states which determine the subjective organization and planning process of aircraft using. The objective maintenance pro- cess is ...

  5. Maintenance and Outage Management Assessment (MOMA)

    International Nuclear Information System (INIS)

    2005-01-01

    The competitive environment has significant implications for nuclear power plant (NPP) operations, which include, inter alia, the need for efficient use of resources and effective management of plant activities of maintenance and outages. The purpose of NPP maintenance and outages is to allow NPPs to use all those functions necessary for safe and reliable power production by keeping them available and adequate maintenance programme is essential. The maintenance programme covers all preventive and remedial measures, both administrative and technical, necessary to identify and mitigate degradation of a functioning system, structure or component, or restore the design functions of a failed system, structure or component to an acceptable level. In response to the needs of MSs, NPES (Nuclear Power Section, Division of Nuclear Power, IAEA) plans to strengthen its services. NPES services will not only continue to provide its 'traditional' products of publications of nuclear industrial best practices and technical implementation of TC projects on plant maintenance and outage management, but also be expanded to deliver, in a timely manner, technical support missions as requested by MSs for NPPs. One of many services is Maintenance and Outage Management Assessment (MOMA). The NPP can obtain support and assistance in assessment and optimisation of its maintenance program and/or outage management. It aims to help the NPP improve its performance of maintenance and outage in a competitive nuclear power business environment. The specific benefits of the assessment are as follows: a) disseminate nuclear industrial best practices on maintenance program and outage management in the world, b) benchmark, evaluate and optimise the approach of maintenance program and outage management and c) identify solutions to known problems at nuclear power plants, if any. MOMA is conducted at the request of NPPs of any IAEA Member States. MOMA consists in a technical mission/visit for 1-3 weeks by

  6. King eider foraging effort during the pre-breeding period in Alaska

    Science.gov (United States)

    Oppel, Steffen; Powell, Abby N.; Butler, Malcolm G.

    2011-01-01

    For reproduction, many arctic-nesting migratory birds rely on nutrients obtained on the breeding grounds, so they devote sufficient time to foraging immediately prior to nesting. However, little is known about the increase in foraging effort necessary to meet the energetic requirements of reproduction. In early June 2006 and 2008, we quantified the proportion of time spent foraging before breeding by a large sea duck, the King Eider (Somateria spectabilis), on its breeding grounds in northern Alaska. During >235 hours of behavioral observations, both male and female King Eiders spent >50% of the day loafing (resting, sleeping, comfort behavior, or being alert). Females foraged on average 30% of the time (mean 7.2 hr day-1,95% CI 6.0-8.4 hr day-1), three times as much as males (9%; 2.3 hr day-1, 95% CI 1.5–2.8 hr day-1). The most common prey in ponds where the eiders foraged were chironomid larvae and worms ranging in length from 1 to 30 mm. If the King Eider's daily energy expenditure on its breeding grounds is similar to values published for related species, it would need to ingest only 0.2–0.6 g dry mass of invertebrates per minute of foraging to meet its energetic requirements. Males did not lose body mass before breeding, and we assume that their foraging effort was sufficient for energy balance. Therefore, female King Eiders appear to triple their foraging effort over maintenance requirements to meet the energetic challenges of egg formation.

  7. Collaborative learning in condition based maintenance

    NARCIS (Netherlands)

    Koochaki, J.; Ao, SI; Gelman, L; Hukins, DWL; Hunter, A; Korsunsky, AM

    2009-01-01

    In recent years, the importance of reliable and consistent production equipments has increased. As a result, companies are shifting their maintenance policy from preventive maintenance towards Condition Based Maintenance (CBM). Despite the growing trend in this area and success stories of CBM

  8. Maintenance Staffing Standards for Zero-Based Budgeting.

    Science.gov (United States)

    Adams, Matthew C.; And Others

    1998-01-01

    Discusses school preventive maintenance and the variables associated with maintenance staffing standards that address a zero-based budgeting environment. Explores preventive-maintenance measurement for staffing requirements, defines staffing levels and job descriptions, and outlines the factors to consider when creating a maintenance program and…

  9. Artificial intelligence applications for operation and maintenance

    International Nuclear Information System (INIS)

    Itoh, M.; Tai, I.; Monta, K.; Sekimizu, K.

    1987-01-01

    A nuclear power plant as a typical man-machine system of the modern industry needs an efficient human window through which operators can observe every necessary detail of the plant for its safe and reliable operation. Much efforts have been devoted to the development of the computerized operator support systems (COSS). Recent development of artificial intelligence (AI) seems to offer new possibility to strengthen the performance of the COSS such as more powerful diagnosis and procedure synthesis and user friendly man-machine interfaces. From this point of view, a national project of Advanced Man-Machine System Development for Nuclear Power Plants has been carried out. Artificial intelligence application to nuclear power plant operation and maintenance is also selected as a major theme for the promotion of research and development on frontiers in the recently revised long term national program for development and utilization of nuclear energy in JAPAN

  10. Mobile network maintenance (GSM)

    CERN Multimedia

    IT Department

    2009-01-01

    Maintenance work will be carried out on the CERN mobile network infrastructure (GSM) on the 23 and 24 July from 6 p.m. to 6 a.m. in order to replace discontinued equipment and to increase the bandwidth capacity of the GSM mobile network. All CERN GSM emitters (40 units) will be moved one by one to the new infrastructure during the maintenance. The call of a user connected to an emitter at the time of its maintenance will be cut off. However, the general overlapping of the GSM radio coverage should mean that users are able immediately to call again should their call be interrupted. IT/CS/CS

  11. Sensor/signal monitoring and plant maintenance

    International Nuclear Information System (INIS)

    Ciftcioglu, Oe.; Tuerkcan, E.

    1994-02-01

    Nuclear Power Plant (NPO) availability is determined by the intended functionality of safety related system and components. Therefore, maintenance is an important issue in a power plant connected to the plant's reliability and safety. The traditional maintenance policies proved to be rather costly and even not effectively addressing NPP requirements. Referring to these drawbacks, in the last decade, in the nuclear reliability centered maintenance (RCM) gained substantial interest due to its merits. In the formal implementation of RCM, apparently, predictive maintenance is not considered. However, with the impact of modern real-time and on-line surveillance and monitoring methodologies, the predictive maintenance procedures like sensor/signal verification and validation are to be included into RCM. (orig.)

  12. Building Maintenance Management System for Heritage Museum

    OpenAIRE

    Md Azree Othuman Mydin; Siti Hajar Ismail; Norhidayah Md Ulang

    2012-01-01

    An investment in the building maintenance aspect is massive throughout the world. In most of the countries, it signifies approximately 50% of the entire revenue of the construction industry. The value of buildings depends on the eminence of the maintenance invested in them. Maintenance management engages obtaining utmost advantage from the investment made on the maintenance activities. At the moment, maintenance in buildings in Malaysia is on the increase in spite of size, ...

  13. Lifetime oriented maintenance planning in the Netherlands

    NARCIS (Netherlands)

    Straub, A.

    2003-01-01

    In this paper we set up a framework for lifetime oriented maintenance planning as an outcome and input for strategic housing stock management. The maintenance planning holds maintenance activities and costs in the longer term. We consider the maintenance planning as a tool to calculate and implement

  14. Remote maintenance development

    International Nuclear Information System (INIS)

    Zook, C.R.

    1979-01-01

    The concept of remote maintenance as it pertains to nuclear fuel fabrication facilities is quite unique. The future may require completely remote facilities where maintenance will be performed by hybrid manipulators/robots. These units will be capable of being preprogrammed for automatic operation or manually operated with the operator becoming a part of the closed loop control system. These robots will mesh television, computer control, and direct force feedback manual control in a usable new concept of robotics

  15. Comparison of cardiovascular response to combined static-dynamic effort, postprandial dynamic effort and dynamic effort alone in patients with chronic ischemic heart disease

    International Nuclear Information System (INIS)

    Hung, J.; McKillip, J.; Savin, W.; Magder, S.; Kraus, R.; Houston, N.; Goris, M.; Haskell, W.; DeBusk, R.

    1982-01-01

    The cardiovascular responses to combined static-dynamic effort, postprandial dynamic effort and dynamic effort alone were evaluated by upright bicycle ergometry during equilibrium-gated blood pool scintigraphy in 24 men, mean age 59 +/- 8 years, with chronic ischemic heart disease. Combined static-dynamic effort and the postprandial state elicited a peak cardiovascular response similar to that of dynamic effort alone. Heart rate, intraarterial systolic and diastolic pressures, rate-pressure product and ejection fraction were similar for the three test conditions at the onset of ischemia and at peak effort. The prevalence and extent of exercise-induced ischemic left ventricular dysfunction, ST-segment depression, angina pectoris and ventricular ectopic activity were also similar during the three test conditions. Direct and indirect measurements of systolic and diastolic blood pressure were highly correlated. The onset of ischemic ST-segment depression and angina pectoris correlated as strongly with heart rate alone as with the rate-pressure product during all three test conditions. The cardiovascular response to combined static-dynamic effort and to postprandial dynamic effort becomes more similar to that of dynamic effort alone as dynamic effort reaches a symptom limit. If significant ischemic and arrhythmic abnormalities are absent during symptom-limited dynamic exercise testing, they are unlikely to appear during combined static-dynamic or postprandial dynamic effort

  16. Structuring AHP-based maintenance policy selection

    NARCIS (Netherlands)

    Goossens, Adriaan; Basten, Robertus Johannes Ida; Hummel, J. Marjan; van der Wegen, Leonardus L.M.

    2015-01-01

    We aim to structure the maintenance policy selection process for ships, using the Analytic Hierarchy Process (AHP). Maintenance is an important contributor to reach the intended life-time of capital technical assets, and it is gaining increasing interest and relevance. A maintenance policy is a

  17. Computerizing Maintenance Management Improves School Processes.

    Science.gov (United States)

    Conroy, Pat

    2002-01-01

    Describes how a Computerized Maintenance Management System (CMMS), a centralized maintenance operations database that facilitates work order procedures and staff directives, can help individual school campuses and school districts to manage maintenance. Presents the benefits of CMMS and things to consider in CMMS selection. (EV)

  18. Maintenance program guidelines for programmatic equipment

    International Nuclear Information System (INIS)

    1994-11-01

    The Division Directors at Lawrence Berkeley Laboratory are responsible for implementing a maintenance program for research equipment (also referred to as programmatic equipment) assigned to them. The program must allow maintenance to be accomplished in a manner that promotes operational safety, environmental protection and compliance, and cost effectiveness; that preserves the intended functions of the facilities and equipment; and that supports the programmatic mission of the Laboratory. Programmatic equipment -- such as accelerators, lasers, radiation detection equipment, and glove boxes -- is dedicated specifically to research. Installed equipment, by contrast, includes the mechanical and electrical systems installed as part of basic building construction, equipment essential to the normal functioning of the facility and its intended use. Examples of installed equipment are heating, ventilating, and air conditioning systems; elevators; and communications systems. The LBL Operating and Assurance Program Plan (PUB-3111, Revision 4) requires that a maintenance program be prepared for programmatic equipment and defines the basic maintenance program elements. Such a program of regular, documented maintenance is vital to the safety and quality of research activities. As a part of that support, this document offers guidance to Laboratory organizations for developing their maintenance programs. It clarifies the maintenance requirements of the Operating and Assurance Program (OAP) and presents an approach that, while not the only possibility, can be expected to produce an effective maintenance program for research equipment belonging to the Laboratory's organizations

  19. Asbestos exposure of building maintenance personnel.

    Science.gov (United States)

    Mlynarek, S; Corn, M; Blake, C

    1996-06-01

    The exposures of building maintenance personnel and occupants to airborne asbestos fibers, and the effects of operations and maintenance programs on those exposures, continue to be an important public health issue. The subject of this investigation was a large metropolitan county with numerous public buildings which routinely conducted air sampling for asbestos. A total of 302 personal air samples in nine task categories collected during maintenance worker activities in proximity to asbestos-containing materials were analyzed; 102 environmental air samples in four task categories were also analyzed. The arithmetic means of the 8-hr time weighted average exposures for personal sampling for each task category were all below the Occupational Safety and Health Administration permissible exposure level of 0.1 fibers (f)/cc > 5 microm. The highest mean 8-hr time weighted average exposure was 0.030 f/cc > 5 microm for ceiling tile replacement. The maximum asbestos concentration during sample collection for environmental samples was 0.027 f/cc > 5 microm. All asbestos-related maintenance work was done within the framework of an Operations and Maintenance Program (OMP) which utilized both personal protective equipment and controls against fiber release/dispersion. Results are presented in association with specific OMP procedures or controls. These results support the effectiveness of using Operations and Maintenance Programs to manage asbestos in buildings without incurring unacceptable risk to maintenance workers performing maintenance tasks.

  20. Maintenance technologies for reactor internals

    Energy Technology Data Exchange (ETDEWEB)

    Sato, Kenji [Nuclear Energy Systems and Services Div., Toshiba Corp., Tokyo (Japan); Kobayashi, Masahiro [Toshiba Corp., Yokohama (Japan). Keihin Product Operations; Sano, Yuji; Kimura, Seiichiro [Power and Industrial Systems Research and Development Center, Toshiba Corp., Tokyo(Japan)

    2000-10-01

    Toshiba places the highest priority on maintenance technologies for the reactor pressure vessel (RPV) and its internals in operating nuclear power plants. This paper summarizes the status of applied laser maintenance technologies, both preventive and repair. For laser peeing and laser desensitization treatment (LDT) technologies in particular, field applications are also described in detail. In the future, the area of field applications for preventive maintenance, repair, and inspection technologies will be further expanded. (author)

  1. Upgrade of maintenance technologies of Nuclear Power Plants

    International Nuclear Information System (INIS)

    Kamada, Kazuaki

    2005-01-01

    In order to enhance long-term safe and stable operation of Ikata Nuclear Power Plants (NPPs) in more efficient way, maintenance technology upgrade project was started aiming at establishment of simplified and efficient self-maintenance system with affiliated companies. Maintenance technique and supervisor qualification system was introduced after improvement and reinforcement of personnel education and training. Reflecting investigation of maintenance activities of US NPPs and productivity improvement in other industries, preventive maintenance optimization project had been performed such as introduction of key performance indicator (KPI), new system incorporating reliability-centered maintenance (RCM) and condition-based maintenance (CBM), and on-line monitoring and maintenance (OLM) based on risk assessment. Enterprise asset management (EAM) to establish information data base and total productive maintenance (TPM) action for every personnel to participate in self-maintenance was also introduced. (T. Tanaka)

  2. Effort in Multitasking: Local and Global Assessment of Effort.

    Science.gov (United States)

    Kiesel, Andrea; Dignath, David

    2017-01-01

    When performing multiple tasks in succession, self-organization of task order might be superior compared to external-controlled task schedules, because self-organization allows optimizing processing modes and thus reduces switch costs, and it increases commitment to task goals. However, self-organization is an additional executive control process that is not required if task order is externally specified and as such it is considered as time-consuming and effortful. To compare self-organized and externally controlled task scheduling, we suggest assessing global subjective and objectives measures of effort in addition to local performance measures. In our new experimental approach, we combined characteristics of dual tasking settings and task switching settings and compared local and global measures of effort in a condition with free choice of task sequence and a condition with cued task sequence. In a multi-tasking environment, participants chose the task order while the task requirement of the not-yet-performed task remained the same. This task preview allowed participants to work on the previously non-chosen items in parallel and resulted in faster responses and fewer errors in task switch trials than in task repetition trials. The free-choice group profited more from this task preview than the cued group when considering local performance measures. Nevertheless, the free-choice group invested more effort than the cued group when considering global measures. Thus, self-organization in task scheduling seems to be effortful even in conditions in which it is beneficiary for task processing. In a second experiment, we reduced the possibility of task preview for the not-yet-performed tasks in order to hinder efficient self-organization. Here neither local nor global measures revealed substantial differences between the free-choice and a cued task sequence condition. Based on the results of both experiments, we suggest that global assessment of effort in addition to

  3. Risk-based maintenance-Techniques and applications

    International Nuclear Information System (INIS)

    Arunraj, N.S.; Maiti, J.

    2007-01-01

    Plant and equipment, however well designed, will not remain safe or reliable if it is not maintained. The general objective of the maintenance process is to make use of the knowledge of failures and accidents to achieve the possible safety with the lowest possible cost. The concept of risk-based maintenance was developed to inspect the high-risk components usually with greater frequency and thoroughness and to maintain in a greater manner, to achieve tolerable risk criteria. Risk-based maintenance methodology provides a tool for maintenance planning and decision making to reduce the probability of failure of equipment and the consequences of failure. In this paper, the risk analysis and risk-based maintenance methodologies were identified and classified into suitable classes. The factors affecting the quality of risk analysis were identified and analyzed. The applications, input data and output data were studied to understand their functioning and efficiency. The review showed that there is no unique way to perform risk analysis and risk-based maintenance. The use of suitable techniques and methodologies, careful investigation during the risk analysis phase, and its detailed and structured results are necessary to make proper risk-based maintenance decisions

  4. Bridging the conservation design and delivery gap for wetland bird habitat maintenance and restoration in the Midwestern United States

    Science.gov (United States)

    Thogmartin, W.E.; Potter, B.; Soulliere, G.

    2011-01-01

    The U.S. Fish and Wildlife Service's adoption of Strategic Habitat Conservation is intended to increase the effectiveness and efficiency of conservation delivery by targeting effort in areas where biological benefits are greatest. Conservation funding has not often been allocated in accordance with explicit biological endpoints, and the gap between conservation design (the identification of conservation priority areas) and delivery needs to be bridged to better meet conservation goals for multiple species and landscapes. We introduce a regional prioritization scheme for North American Wetlands Conservation Act funding which explicitly addresses Midwest regional goals for wetland-dependent birds. We developed decision-support maps to guide conservation of breeding and non-breeding wetland bird habitat. This exercise suggested ~55% of the Midwest consists of potential wetland bird habitat, and areas suited for maintenance (protection) were distinguished from those most suited to restoration. Areas with greater maintenance focus were identified for central Minnesota, southeastern Wisconsin, the Upper Mississippi and Illinois rivers, and the shore of western Lake Erie and Saginaw Bay. The shores of Lakes Michigan and Superior accommodated fewer waterbird species overall, but were also important for wetland bird habitat maintenance. Abundant areas suited for wetland restoration occurred in agricultural regions of central Illinois, western Iowa, and northern Indiana and Ohio. Use of this prioritization scheme can increase effectiveness, efficiency, transparency, and credibility to land and water conservation efforts for wetland birds in the Midwestern United States.

  5. Improvement of nuclear power plant operation and maintenance in Japan

    International Nuclear Information System (INIS)

    Kazushige Hamazaki

    1987-01-01

    Following the inauguration of commercial nuclear power generation in Japan in 1966, capacity factors were held in the relatively low level until around 1975 due to initial-period troubles. With subsequent improvement, however, capacity factors have climbed steadily and recently been sustaining more than 70%. To obtain this successful result, a various kind of improvement have been made not only for the operation management area but also for the maintenance management area in conjunction with the successive effort to reflect the operating experiences to the early stage design. Nowadays nuclear generation has assumed increasing importance for Japan's electrical power needs, and is making a great contribution to stabilizing power supply costs. (author)

  6. A COMPUTER BASED MAINTENANCE MANAGEMENT SYSTEM ...

    African Journals Online (AJOL)

    ... programs to schedule for maintenance or replacement of machines has been designed such that it enables the maintenance department control all jobs associated with plant maintenance and breakdown. It predicts the time to failure of designated plants and caters for the replacement analysis of some capital equipment.

  7. Status of online maintenance in the world

    International Nuclear Information System (INIS)

    Mizumachi, Wataru; Kobayashi, Masahide

    2009-01-01

    In many countries, online maintenance has been already introduced. Especially in US, online maintenance has been introduced to many nuclear plants which has (N+1) redundant safety systems as Japanese plants. There experience will contribute us to discuss how to introduce online maintenance in Japan. In IAEA's nuclear safety criteria and guidance, it is recognized that the outage of one safety system for maintenance is usual operation. This is normal sense in the world. In US, the risk when online maintenance is done is controlled mainly by PRA. We have to discuss how to introduce online maintenance in JAPAN under these conditions in the world. (author)

  8. 14 CFR 145.217 - Contract maintenance.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Contract maintenance. 145.217 Section 145...) SCHOOLS AND OTHER CERTIFICATED AGENCIES REPAIR STATIONS Operating Rules § 145.217 Contract maintenance. (a) A certificated repair station may contract a maintenance function pertaining to an article to an...

  9. Remote maintenance in nuclear fuel reprocessing

    International Nuclear Information System (INIS)

    Herndon, J.N.

    1985-01-01

    Remote maintenance techniques applied in large-scale nuclear fuel reprocessing plants are reviewed with particular attention to the three major maintenance philosophy groupings: contact, remote crane canyon, and remote/contact. Examples are given, and the relative success of each type is discussed. Probable future directions for large-scale reprocessing plant maintenance are described along with advanced manipulation systems for application in the plants. The remote maintenance development program within the Consolidated Fuel Reprocessing Program at the Oak Ridge National Laboratory is also described. 19 refs., 19 figs

  10. Maintenance Approaches for Different Production Methods

    Directory of Open Access Journals (Sweden)

    Mungani, Dzivhuluwani Simon

    2013-11-01

    Full Text Available Various production methods are used in industry to manufacture or produce a variety of products needed by industry and consumers. The nature of a product determines which production method is most suitable or cost-effective. A continuous process is typically used to produce large volumes of liquids or gases. Batch processing is often used for small volumes, such as pharmaceutical products. This paper discusses a research project to determine the relationship between maintenance approaches and production methods. A survey was done to determine to what extent three maintenance approaches reliability-centred maintenance (RCM, total productive maintenance (TPM, and business-centred maintenance (BCM are used for three different processing methods (continuous process, batch process, and a production line method.

  11. Improving regulatory oversight of maintenance programs

    International Nuclear Information System (INIS)

    Cook, S.

    2008-01-01

    Safe nuclear power plant operation requires that risks due to failure or unavailability of Structures, Systems and Components (SSCs) be minimized. Implementation of an effective maintenance program is a key means for achieving this goal. In its regulatory framework, the important relationship between maintenance and safety is acknowledged by the CNSC. A high level maintenance program requirement is included in the Class I Facilities Regulations. In addition, the operating licence contains a condition based on the principle that the design function and performance of SSCs needs to remain consistent with the plant's design and analysis documents. Nuclear power plant licensees have the primary responsibility for safe operation of their facilities and consequently for implementation of a successful maintenance program. The oversight role of the Canadian Nuclear Safety Commission (CNSC) is to ensure that the licensee carries out that responsibility. The challenge for the CNSC is how to do this consistently and efficiently. Three opportunities for improvement to regulatory maintenance oversight are being pursued. These are related to the regulatory framework, compliance verification inspection activities and monitoring of self-reporting. The regulatory framework has been improved by clarifying expectations through the issuance of S-210 'Maintenance Programs for Nuclear Power Plants'. Inspection activities have been improved by introducing new maintenance inspections into the baseline program. Monitoring is being improved by making better use of self-reported and industry produced maintenance related performance indicators. As with any type of program change, the challenge is to ensure the consistent and optimal application of regulatory activities and resources. This paper is a summary of the CNSC's approach to improving its maintenance oversight strategy. (author)

  12. A probabilistic maintenance model for diesel engines

    Science.gov (United States)

    Pathirana, Shan; Abeygunawardane, Saranga Kumudu

    2018-02-01

    In this paper, a probabilistic maintenance model is developed for inspection based preventive maintenance of diesel engines based on the practical model concepts discussed in the literature. Developed model is solved using real data obtained from inspection and maintenance histories of diesel engines and experts' views. Reliability indices and costs were calculated for the present maintenance policy of diesel engines. A sensitivity analysis is conducted to observe the effect of inspection based preventive maintenance on the life cycle cost of diesel engines.

  13. Knowledge engineering thinking of maintenance

    International Nuclear Information System (INIS)

    2007-01-01

    Maintenance optimization problem could not always settled mathematically and was obliged to use quasi-optimum solution with omitting non-formulated limiting condition or neglecting part of optimization object. In such a case knowledge engineering thinking was encouraged. Maintenance of complicated plant and artificial system should be considered from artificial object (equipment/facility hardware and system), technical information and knowledge base, and organizational and human aspect or society and institution. Comprehensive management system in organization and society was necessary not only for assuring integrity of equipment but also for attaining higher performance, reliability and economics of system. For better judgment it was important to share mechanism to make use of more information with organization or whole society. It was required to create database and data mining for knowledge base management system of maintenance. Maintenance was called 'last fortress' to assure quality such as reliability and safety of required function of equipment. Strategic approach to develop maintenance technology under cooperation was considered. Life extension R and D road map was launched in 2005. (T. Tanaka)

  14. Maintenance and environmental qualification

    International Nuclear Information System (INIS)

    Martin, R.S.; Austin, D.G.

    1995-01-01

    The design of today's nuclear generating plants involves many detailed design considerations. This includes comprehensive look at aging effects on plant components over their expected lifetimes. This is important to ensuring that the plant operates safely throughout its life. The effects of aging are required to be documented in detail in today's designs. This documentation provides assurance that safe operating conditions are maintained throughout the station life cycle. This requirement is analogous to the longer standing requirement to ensure pressure boundary integrity. The pressure boundary integrity requirement has existed in the industry since its inception. The subject of plant aging effects and the maintenance of functionality is known as Environmental Qualification (EQ). This paper will attempt to explain the wisdom of EQ and the potential for optimizing maintenance activities (to move from reactive to proactive activities), within the context of the overall maintenance program. It is the author's intent to encourage the active involvement of maintenance professionals in the effective implementation of the ongoing EQ program so that the benefits are maximized

  15. Estimation of inspection effort

    International Nuclear Information System (INIS)

    Mullen, M.F.; Wincek, M.A.

    1979-06-01

    An overview of IAEA inspection activities is presented, and the problem of evaluating the effectiveness of an inspection is discussed. Two models are described - an effort model and an effectiveness model. The effort model breaks the IAEA's inspection effort into components; the amount of effort required for each component is estimated; and the total effort is determined by summing the effort for each component. The effectiveness model quantifies the effectiveness of inspections in terms of probabilities of detection and quantities of material to be detected, if diverted over a specific period. The method is applied to a 200 metric ton per year low-enriched uranium fuel fabrication facility. A description of the model plant is presented, a safeguards approach is outlined, and sampling plans are calculated. The required inspection effort is estimated and the results are compared to IAEA estimates. Some other applications of the method are discussed briefly. Examples are presented which demonstrate how the method might be useful in formulating guidelines for inspection planning and in establishing technical criteria for safeguards implementation

  16. Optimization and maintenance tests considering multiple failure modes, aging and imperfect maintenance

    International Nuclear Information System (INIS)

    Martorell, S.; Marton, I.; Sanchez, A.; Carlos, S.

    2014-01-01

    The paper focuses on the optimization of the test and maintenance intervals under the criteria of unavailability or cost including the effect of the aging of the components and models of imperfect maintenance. The results obtained in the case of application, which focuses on a system of safety of a nuclear power station, show differences, mainly in the outage when you consider the aging. (Author)

  17. Inspection of licensee - Maintenance programme and activities

    International Nuclear Information System (INIS)

    2013-01-01

    An effective maintenance programme is critical to sustained safe and reliable operation of nuclear power plants. The Working Group on Inspection Practices (WGIP) concluded that when a licensee has an effective maintenance programme, the overall operating safety of the plant is improved and the protection of public health and safety enhanced. All Regulatory Bodies (RB) consider maintenance to be an important area for oversight. Although a variety of inspection practices are being used; RB are actively monitoring licensee performance. Specifically the following conclusions were reached and commendable practices identified: - Maintenance oversight by regulators appears to be in a stable continuous improvement state. Most regulators are executing inspection oversight based on an existing regulatory framework. - The performance of a licensee's maintenance programme is recognized as important part of maintaining nuclear safety. The result of the maintenance program assessment is included in the overall performance assessment of a license. - Maintenance inspection activities are recognized as an important part of the regulatory oversight process. Inspection activities are based on the safety significance and nature of work being performed by the licensee. - The effectiveness of the maintenance inspection activities is recognized to rely on properly qualified inspectors; who are adequately supported by specialists. Training and qualification of inspectors should be based on how the RB reviews and inspects licensee maintenance programmes. - Reporting requirements are identified to provide information on the licensees maintenance programme, and to help guide inspection activities. - Performance Indicators are recognized as a useful tool for helping focus regulatory activities. Basic PI are identified and tracked by the RB, and use of PI by the licensee is monitored. - Inspections are designed to confirm that the licensee is planning and scheduling maintenance with due

  18. Using heuristic search for optimizing maintenance plans

    International Nuclear Information System (INIS)

    Mutanen, Teemu

    2012-01-01

    This work addresses the maintenance action selection process. Maintenance personnel need to evaluate maintenance actions and costs to keep the machines in working condition. Group of actions are evaluated together as maintenance plans. The maintenance plans as output provide information to the user about which actions to take if any and what future actions should be prepared for. The heuristic search method is implemented as part of general use toolbox for analysis of measurements from movable work machines. Impacts from machine's usage restrictions and maintenance activities are analysed. The results show that once put on a temporal perspective, the prioritized order of the actions is different and provide additional information to the user.

  19. Advantages of condition-based maintenance approach

    International Nuclear Information System (INIS)

    Bareiss, J.; Roos, E.; Jovanovic, A.; Perunicic, M.; Balos, D.

    2004-01-01

    Pilot applications in EnBW steam boiler components and high-pressure pipe systems in the context of the European research project RIMAP (''Risk Based Inspection and Maintenance Procedures for European Industry'') showed that application of a risk-based maintenance strategy (e.g. RIMAP) will make the decision process more transparent and enable better condition-oriented maintenance. With regard to life management of the systems (availability, product quality), this appears to be more important than than the aspect of cost reduction in the maintenance sector, although the latter may not be unwelcome. (orig.) [de

  20. Buildings Lean Maintenance Implementation Model

    Science.gov (United States)

    Abreu, Antonio; Calado, João; Requeijo, José

    2016-11-01

    Nowadays, companies in global markets have to achieve high levels of performance and competitiveness to stay "alive".Within this assumption, the building maintenance cannot be done in a casual and improvised way due to the costs related. Starting with some discussion about lean management and building maintenance, this paper introduces a model to support the Lean Building Maintenance (LBM) approach. Finally based on a real case study from a Portuguese company, the benefits, challenges and difficulties are presented and discussed.

  1. On-Line Maintenance Methodology Development

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Hyo Won; Kim, Jae Ho; Jae, Moo Sung [Hanyang University, Seoul (Korea, Republic of)

    2012-05-15

    Most of domestic maintenance activities for nuclear power plants are performed while overhaul. Therefore, On-Line Maintenance (OLM) is one of the proper risks informed application techniques for diffusing maintenance burden during overhaul with safety of the plant is secured. The NUMARC 93-01 (Rev.3) presents the OLM state of the art and it provides methodology. This study adopts NUMARC 93-01 (Rev.3) and present OLM. The reference component is Emergency Diesel Generator (EDG) of Ulchin 3, 4

  2. Solar PV O&M Standards and Best Practices – Existing Gaps and Improvement Efforts

    Energy Technology Data Exchange (ETDEWEB)

    Klise, Geoffrey Taylor [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Balfour, John R. [High Performance PV, Phoenix, AZ (United States); Keating, T. J. [SunSpec Alliance, San Jose, CA (United States)

    2014-11-01

    As greater numbers of photovoltaic (PV) systems are being installed, operations & maintenance (O&M) activities will need to be performed to ensure the PV system is operating as designed over its useful lifetime. To mitigate risks to PV system availability and performance, standardized procedures for O&M activities are needed to ensure high reliability and long-term system bankability. Efforts are just getting underway to address the need for standard O&M procedures as PV gains a larger share of U.S. generation capacity. Due to the existing landscape of how and where PV is installed, including distributed generation from small and medium PV systems, as well as large, centralized utility-scale PV, O&M activities will require different levels of expertise and reporting, making standards even more important. This report summarizes recent efforts made by solar industry stakeholders to identify the existing standards and best practices applied to solar PV O&M activities, and determine the gaps that have yet to be, or are currently being addressed by industry.

  3. Environmental favourable foundries through maintenance activities

    Directory of Open Access Journals (Sweden)

    A. Saniuk

    2015-10-01

    Full Text Available Maintenance today contributes to the aim of sustainable development in society, including environmental and energy saving, safety and economical aspects. The main purpose of the paper is to present the role of maintenance in the realization of sustainable developing practices in a foundry industry. Maintenance offers numerous opportunities to reduce the influence of foundry processes on the natural environment and utilize resources more efficiently. Maintenance activities can help to reduce losses and thereby improve the efficiency of the processes used in the production of resources (e.g. raw materials, energy, etc., especially in areas such as: the choice of an appropriate strategy for the maintenance of machinery and equipment (e.g. reactive, preventive, proactive; inventory management of spare parts; lubrication management and management of technology media.

  4. Efforts onto electricity and instrumentation technology for nuclear power generation

    International Nuclear Information System (INIS)

    Hayakawa, Toshifumi

    2000-01-01

    Nuclear power generation shares more than 1/3 of all amounts of in-land generation at present, as a supplying source of stable electric energy after 2000 either. As a recent example of efforts onto electricity and instrumentation technology for nuclear power generation, there are, on instrumentation control system a new central control board aiming at reduction of operator's load, protection of human error, and upgrading of system reliability and economics by applying high level micro-processor applied technique and high speed data transfer technique to central monitoring operation and plant control protection, on a field of reactor instrumentation a new digital control rod position indicator improved of conventional system on a base of operation experience and recent technology, on a field of radiation instrumentation a new radiation instrumentation system accumulating actual results in a wide application field on a concept of application to nuclear power plant by adopting in-situ separation processing system using local network technique, and on a field of operation maintenance and management a conservation management system for nuclear generation plant intending of further effectiveness of operation maintenance management of power plant by applying of operation experience and recent data processing and communication technology. And, in the large electric apparatus, there are some generators carried out production and verification of a model one with actual size in lengthwise dimension, to correspond to future large capacity nuclear power plant. By this verification, it was proved that even large capacity generator of 1800 MVA class could be manufactured. (G.K.)

  5. Evaluations of maintenance effectiveness on unavailability and risk

    International Nuclear Information System (INIS)

    Vesely, W.E.

    1993-01-01

    A methodology is presented for quantifying the effectiveness of maintenance on unavailability and on risk. The methodology is based on standard Markov modeling principles. What is new is the application to quantify maintenance effectiveness by explicitly quantifying maintenance benefits as well as maintenance's negative contributions. Maintenance effects are quantified by defining a degraded state for the component in addition to an operational state and a failed state which are usually defined. The maintenance model which is developed is a natural extension of the standard models used in reliability analysis and in Probabilistic Risk Assessments (PRAs). The results which are obtained can be directly used in PRAs. Applications of the methodology are presented by quantifying maintenance effectiveness on component performance and component unavailability for specific maintenance schedules

  6. Prevalence of operator fatigue in winter maintenance operations.

    Science.gov (United States)

    Camden, Matthew C; Medina-Flintsch, Alejandra; Hickman, Jeffrey S; Bryce, James; Flintsch, Gerardo; Hanowski, Richard J

    2018-02-02

    Similar to commercial motor vehicle drivers, winter maintenance operators are likely to be at an increased risk of becoming fatigued while driving due to long, inconsistent shifts, environmental stressors, and limited opportunities for sleep. Despite this risk, there is little research concerning the prevalence of winter maintenance operator fatigue during winter emergencies. The purpose of this research was to investigate the prevalence, sources, and countermeasures of fatigue in winter maintenance operations. Questionnaires from 1043 winter maintenance operators and 453 managers were received from 29 Clear Road member states. Results confirmed that fatigue was prevalent in winter maintenance operations. Over 70% of the operators and managers believed that fatigue has a moderate to significant impact on winter maintenance operations. Approximately 75% of winter maintenance operators reported to at least sometimes drive while fatigued, and 96% of managers believed their winter maintenance operators drove while fatigued at least some of the time. Furthermore, winter maintenance operators and managers identified fatigue countermeasures and sources of fatigue related to winter maintenance equipment. However, the countermeasures believed to be the most effective at reducing fatigue during winter emergencies (i.e., naps) were underutilized. For example, winter maintenance operators reported to never use naps to eliminate fatigue. These results indicated winter maintenance operations are impacted by operator fatigue. These results support the increased need for research and effective countermeasures targeting winter maintenance operator fatigue. Copyright © 2018 Elsevier Ltd. All rights reserved.

  7. Fast Flux Test Facility (FFTF) maintenance provisions

    International Nuclear Information System (INIS)

    Marshall, J.L.

    1981-05-01

    The Fast Flux Test Facility (FFTF) was designed with maintainability as a primary parameter, and facilities and provisions were designed into the plant to accommodate the maintenance function. This paper describes the FFTF and its systems. Special maintenance equipment and facilities for performing maintenance on radioactive components are discussed. Maintenance provisions designed into the plant to enhance maintainability are also described

  8. Optimum policies for a system with general imperfect maintenance

    International Nuclear Information System (INIS)

    Sheu, S.-H.; Lin, Y.-B.; Liao, G.-L.

    2006-01-01

    This study considers periodic preventive maintenance policies, which maximizes the availability of a repairable system with major repair at failure. Three types of preventive maintenance are performed, namely: imperfect preventive maintenance (IPM), perfect preventive maintenance (PPM) and failed preventive maintenance (FPM). The probability that preventive maintenance is perfect depends on the number of imperfect maintenances conducted since the previous renewal cycle, and the probability that preventive maintenance remains imperfect is not increasing. The optimum preventive maintenance time that maximizes availability is derived. Various special cases are considered. A numerical example is given

  9. Effortful echolalia.

    Science.gov (United States)

    Hadano, K; Nakamura, H; Hamanaka, T

    1998-02-01

    We report three cases of effortful echolalia in patients with cerebral infarction. The clinical picture of speech disturbance is associated with Type 1 Transcortical Motor Aphasia (TCMA, Goldstein, 1915). The patients always spoke nonfluently with loss of speech initiative, dysarthria, dysprosody, agrammatism, and increased effort and were unable to repeat sentences longer than those containing four or six words. In conversation, they first repeated a few words spoken to them, and then produced self initiated speech. The initial repetition as well as the subsequent self initiated speech, which were realized equally laboriously, can be regarded as mitigated echolalia (Pick, 1924). They were always aware of their own echolalia and tried to control it without effect. These cases demonstrate that neither the ability to repeat nor fluent speech are always necessary for echolalia. The possibility that a lesion in the left medial frontal lobe, including the supplementary motor area, plays an important role in effortful echolalia is discussed.

  10. An experimental maintenance management system.

    Science.gov (United States)

    1979-01-01

    The purpose of this study was to evaluate Virginia's maintenance management system and to recommend modifications directed at improving it. The study revealed that (1) the current system of allocating maintenance monies is based upon centerline milea...

  11. Susquehanna SES maintenance supervisor training and certification

    International Nuclear Information System (INIS)

    Deckman, M.

    1991-01-01

    Susquehanna's program targets all Supervisors, Supervisor Candidates, and Temporary Supervisors that are responsible for in-plant maintenance or maintenance support activities, including: mechanical maintenance; electrical maintenance; maintenance support (labor support, radwaste, etc.); mobile construction support (mechanical and electrical); chemistry; health physics; maintenance planning; and instrument and controls. The program integrates the three major areas of direct Supervisory responsibilities: (1) Leadership and Management - Skills that require interpersonal activities that are typically humanistic and subjective; such as coaching, motivating, communications, etc. (2) Technical and Administrative - Knowledge that is directly related to the job of Supervising from the production, regulatory, accountability perspective. These topics are very objective and include training on topics such as workpackages, plant chemistry parameters, radiological concerns, etc. (3) Technical Skills - Ensure each Supervisor is technically competent in the plant systems, components, or equipment he/she is tasked with maintaining or overseeing. Typical skills found in this area are, circuit breaker maintenance, primary system sampling, or overhauling pumps

  12. A VITAL service for predictive MOV maintenance

    International Nuclear Information System (INIS)

    Anon.

    1990-01-01

    Motor-operated valve (MOV) maintenance can be a major contributor to unplanned plant downtime, either because valve malfunctions cause unscheduled outages, or because unnecessary valve maintenance lengthens scheduled outages. The cause of both situations is a preventive approach to valve maintenance, where maintenance is scheduled according to a timetable instead of according to a demonstrated need. To move towards a predictive maintenance approach, inexpensive methods of collecting and diagnosing real-time data on the conditions of a valve must be made available. Such a system must be capable of detecting and diagnosing degrading mechanical and electrical behaviour at an early stage, as well as being able to predict the time of failure. Without this data, a predictive approach to maintenance is impossible. Westinghouse is addressing the requirements for a predictive approach to MOV maintenance with the introduction of a third-generation of diagnostic systems for motor-operated valves -the portable Valve Intelligent Test and Analysis System (VITALS) and the on-line Valve Monitoring System (VMS). (author)

  13. Proactive maintenance initiatives at Argonne National Laboratory-West

    International Nuclear Information System (INIS)

    Duckwitz, N.R.; Duncan, L.W.; Whipple, J.J.

    1995-01-01

    In the late 1980's, ANL-W Management foresaw a need to provide dedicated technical support for maintenance supervisors. Maintenance supervisors were facing increased challenges to ensure all environmental, safety, and waste management regulations were followed in daily maintenance activities. This increased burden was diverting supervisory time away from on-the-job supervision. Supervisors were finding less time for their ''mentor'' roles to ensure maintenance focused on finding and correcting root causes. Additionally the traditional maintenance organization could not keep up with the explosion in predictive maintenance technologies. As a result, engineers were tasked to provide direct technical support to the maintenance organization. Today the maintenance technical support group consists of two mechanical engineers, two electrical engineers and an I ampersand C engineer. The group provides a readily available, quick response resource for crafts people and their supervisors. They can and frequently do ask the support group for help to determine the root cause and to effect permanent fixes. Crafts and engineers work together informally to make an effective maintenance team. In addition to day-to-day problem solving, the technical support group has established several maintenance improvement programs for the site. This includes vibration analysis of rotating machinery, testing of fuel for emergency diesel generators, improving techniques for testing of high efficiency particulate air (HEPA) filters, and capacity testing of UPS and emergency diesel starting batteries. These programs have increased equipment reliability, reduced conventional routine maintenance, reduced unexpected maintenance, and improved testing accuracy. This paper will discuss the interaction of the technical support group within the maintenance department. Additionally the maintenance improvement programs will be presented along with actual cases encountered, the resolutions and lessons learned

  14. Maintenance proficiency evaluation test bank

    International Nuclear Information System (INIS)

    Maier, Loran

    2003-01-01

    The Maintenance Proficiency Evaluation Test Bank (MPETB) is an Electric Power Research Institute- (EPRJ-) operated, utility-sponsored means of developing, maintaining, and disseminating secure, high-quality written and performance maintenance proficiency tests. EPRTs charter is to ensure that all tests and test items that go into the Test Bank have been validated, screened for reliability, and evaluated to high standards of psychometric excellence. Proficiency tests of maintenance personnel.(mechanics, electricians, and instrumentation and control [I and C] technicians) are most often used to determine if an experienced employee is capable of performing maintenance tasks without further training. Such tests provide objective evidence for decisions to exempt an employee from what, for the employee, is unnecessary training. This leads to considerable savings in training costs and increased productivity because supervisors can assign personnel to tasks at which their competence is proven. The ultimate objective of proficiency evaluation is to ensure that qualified maintenance personnel are available to meet the maintenance requirements of the plant Numerous task-specific MPE tests (both written and performance) have been developed and validated using the EPRI MPE methodology by the utilities participating in the MPETB project A task-specific MPE consists of a multiple-choice written examination and a multi-step performance evaluation that can be used to assess an individual's present knowledge and skill level for a given maintenance task. The MPETB contains MPEs and test items for the mechanical, electrical, and I and C classifications that are readily available to participating utilities. Presently, utilities are placing emphasis on developing MPEs to evaluate outage-related maintenance tasks that demonstrate the competency and qualifications of plant and contractor personnel before the start of outage work. Utilities are also using the MPE methodology and process to

  15. Risk and maintenance factors for young women's DSM-5 eating disorders.

    Science.gov (United States)

    Dakanalis, Antonios; Clerici, Massimo; Bartoli, Francesco; Caslini, Manuela; Crocamo, Cristina; Riva, Giuseppe; Carrà, Giuseppe

    2017-12-01

    Recent research with young women attending colleges, who are at the average age of eating disorder (ED) onset, established that the ED symptoms are not only prevalent but also relatively stable over the college period. Nonetheless, our knowledge regarding the course and modifiable factors associated with both the onset and maintenance of diagnosable (DSM-5) EDs in this population is limited. The objective of this report was to address these key research gaps. Data were examined from 2713 women who completed assessments of potential vulnerability factors and EDs in the autumn semester of the first (baseline) and fourth (follow-up) college years. A total of 13.1% of the sample met DSM-5 criteria for an ED diagnosis at baseline. At 4-year follow-up, 7.6% of the sample met DSM-5 criteria for an ED, with 67.5% of these cases representing women who had maintained an ED diagnosis from baseline, and 32.5% representing new onset EDs. Elevated appearance-ideal internalization, body dissatisfaction, self-objectification, dieting, and negative affectivity at baseline as well as changes in these factors between assessments all predicted onset and maintenance of DSM-5 EDs at 4-year follow-up. Self-objectification (thinking about and monitoring the body's appearance from an external observer's perspective) was the largest contributor to both ED onset and maintenance. In addition to enhancing our knowledge about the course of young women's (DSM-5) EDs during college, this work highlights potentially similar psychological foci for prevention and treatment efforts. Implications for improving existing preventive and treatment approaches are outlined.

  16. MOSEG code for safety oriented maintenance management Safety of management of maintenance oriented by MOSEG code

    International Nuclear Information System (INIS)

    Torres Valle, Antonio

    2005-01-01

    Full text: One of the main reasons that makes maintenance contribute highly when facing safety problems and facilities availability is the lack of maintenance management systems to solve these fields in a balanced way. Their main setbacks are shown in this paper. It briefly describes the development of an integrating algorithm for a safety and availability-oriented maintenance management by virtue of the MOSEG Win 1.0 code. (author)

  17. Maintenance of radiation monitoring systems

    International Nuclear Information System (INIS)

    Aoyama, Kei

    2001-01-01

    As the safety and quality of atomic power facilities are more strongly required, the reliability improvement and preventive maintenance of radiation monitoring systems are important. This paper describes the maintenance of radiation monitoring systems delivered by Fuji Electric and the present status of preventive maintenance technology. Also it introduces the case that we developed a fault diagnosis function adopting a statistics technique and artificial intelligence (AI) and delivered a radiation monitoring system including this function. This system can output a fault analysis result and a countermeasure from the computer in real time. (author)

  18. Remote handling maintenance of ITER

    International Nuclear Information System (INIS)

    Haange, R.

    1999-01-01

    The remote maintenance strategy and the associated component design of the International Thermonuclear Experimental Reactor (ITER) have reached a high degree of completeness, especially with respect to those components that are expected to require frequent or occasional remote maintenance. Large-scale test stands, to demonstrate the principle feasibility of the remote maintenance procedures and to develop the required equipment and tools, were operational at the end of the Engineering Design Activities (EDA) phase. The initial results are highly encouraging: major remote equipment deployment and component replacement operations have been successfully demonstrated. (author)

  19. Increasing the competitiveness of maintenance contract rates by using an alternative methodology for the calculation of average vehicle maintenance costs

    Directory of Open Access Journals (Sweden)

    Stephen Carstens

    2008-11-01

    Full Text Available Companies tend to outsource transport to fleet management companies to increase efficiencies if transport is a non-core activity. The provision of fleet management services on contract introduces a certain amount of financial risk to the fleet management company, specifically fixed rate maintenance contracts. The quoted rate needs to be sufficient and also competitive in the market. Currently the quoted maintenance rates are based on the maintenance specifications of the manufacturer and the risk management approach of the fleet management company. This is usually reflected in a contingency that is included in the quoted maintenance rate. An alternative methodology for calculating the average maintenance cost for a vehicle fleet is proposed based on the actual maintenance expenditures of the vehicles and accepted statistical techniques. The proposed methodology results in accurate estimates (and associated confidence limits of the true average maintenance cost and can beused as a basis for the maintenance quote.

  20. Software Configuration Management For Multiple Releases: Influence On Development Effort

    Directory of Open Access Journals (Sweden)

    Sławomir P. Maludziński

    2007-01-01

    Full Text Available Software Configuration Management (SCM evolves together with the discipline of softwareengineering. Teams working on software products become larger and are geographically distributedat multiple sites. Collaboration between such groups requires well evaluated SCMplans and strategies to easy cooperation and decrease software development cost by reducingtime spent on SCM activities – branching and merging, that is effort utilized on creation ofrevisions (’serial’ versions and variants (’parallel’ versions. This paper suggests that SCMpractices should be combined with modular design and code refactoring to reduce cost relatedto maintenance of the same code line. Teams which produce several variants of thesame code line at the same time should use approaches like components, modularization, orplug-ins over code alternations maintained on version branches. Findings described in thispaper were taken by teams in charge of development of radio communication systems inMotorola GEMS divisions. Each team collaborating on similar projects used different SCMstrategies to develop parts of this system.

  1. Recent Research on Language Maintenance.

    Science.gov (United States)

    Garcia, MaryEllen

    2003-01-01

    Describes recent research on language maintenance to provide broad, worldwide coverage of different language contact situations. Surveys various countries in which research within ethnic and minority language communities illuminates language maintenance or shift, or revitalization, for that group. (Author/VWL)

  2. [Potentiation of anti-ischemic and anti-anginal action of nitrates by hydrogen sulfide balneotherapy in patients with angina of effort].

    Science.gov (United States)

    Zunnunov, Z R

    2010-01-01

    The objective of this comparative study was to evaluate effects of nitrosorbid (NS) and hydrogen sulfide-based balneotherapy (HSB) applied alone or in combination for the treatment of patients presenting with angina of effort. It was shown that long-term HSB therapy enhances the anti-anginal and anti-ischemic action of NS in such patients. The authors argue that prolonged HSB-based maintenance therapy in combination with nitrates prevents habituation to these preparations and potentiates their beneficial therapeutic effect.

  3. Advancements in nuclear plant maintenance programs

    International Nuclear Information System (INIS)

    Meligi, A.E.; Maras, M.C.

    1993-01-01

    The viability of the nuclear option as a technology choice for present and future electricity generation will be decided primarily on the basis of operating cost to achieve plant performance objectives. In a nuclear plant, performance is judged not only on availability and output rate but also on safety risk and radiation exposure. Operating, cost is essentially made up of the fuel cost and operation and maintenance (O and M) cost. Over the past decade, the industry average nuclear plant performance has improved significantly; however, this improvement was accompanied by rising O and M cost. The net result was that the nuclear option lost its long-standing economic advantage over the coal option, based on the industry average comparison, around 1987 - with the gap narrowing slightly in the last 2 years. In recent times, gas-fired plants have also become a basis for comparison. The electric generation cost comparisons of various fuel options has led to even greater scrutiny of nuclear plant performance, with the poorer performing plants facing the risk of shutdown. While effective O and M programs improve plant performance, present industry data show that there is no direct correlation between the cost of a plant O and M program and its associated performance. There is a significant number of existing tools and techniques in the O and M area that have proved to be successful and have resulted in significant benefits and payback. This paper presents an overview of the nuclear industry efforts to improve the conduct of O and M activities, describes the basic elements of an effective O and M program, and addresses some of the state-of-the-art tools and techniques to enhance maintenance work planning, training, and procedures

  4. Achieving world class maintenance status

    Energy Technology Data Exchange (ETDEWEB)

    Tomlingson, P.D. [Paul D. Tomingson Associates (United States)

    2007-08-15

    The article written by a management consultant, discusses the art of successful planning and operation of maintenance in mines considering factors such as benchmaking, key performance indices (KPIs) and frequency of procedures which can help achieve 'world class maintenance'. 1 fig.

  5. Conceptualization of an intellectual maintenance management system

    International Nuclear Information System (INIS)

    Suda, Kazunori; Yonekawa, Tsuyoshi; Yoshikawa, Shinji; Ozawa, Kenji

    1997-04-01

    It is studied in many research institute to enhance availability and safety of nuclear power plants operation and maintenance. On this account, development of autonomous plants has been carried out to replace the role of operators with artificial intelligence and autonomous robots. We have been developing an intellectual maintenance management system since 1994. As the first step, concept of an intellectual maintenance management system was constructed. The intellectual maintenance managerial system is in charge of maintenance function of an autonomous plant. The intellectual maintenance managerial system has three functions which is monitoring state and judging abnormal machine and deciding maintenance plan by autonomy. This system has an important role of indication and communication of the result to an autonomous operation system and autonomous robot. In this examination, we adopted the distributed and cooperative system technique by multi-agent of AI technology and examined a method to enforce problem solving by cooperation of sensor and actuator. In this report, we examined trouble detection and troubleshooting evaluation and maintenance plan decision function by the distributed and cooperative system technology, the distributed and cooperative system communication-function that these information releases functions was taken on. In conceptualization of the intellectual maintenance managerial system, we clarified of major functions to constitute this system and relation between autonomous operation system and autonomous robots. We clarified the information exchange scheme between this system and an outside system furthermore. In future, we will prototype each function and inspect the total system. (author)

  6. Computer assisted procedure maintenance

    International Nuclear Information System (INIS)

    Bisio, R.; Hulsund, J. E.; Nilsen, S.

    2004-04-01

    The maintenance of operating procedures in a NPP is a tedious and complicated task. Through the whole life cycle of the procedures they will be dynamic, 'living' documents. Several aspects of the procedure must be considered in a revision process. Pertinent details and attributes of the procedure must be checked. An organizational structure must be created and responsibilities allotted for drafting, revising, reviewing and publishing procedures. Available powerful computer technology provides solutions within document management and computerisation of procedures. These solutions can also support the maintenance of procedures. Not all parts of the procedure life cycle are equally amenable to computerized support. This report looks at the procedure life cycle in todays NPPs and discusses the possibilities associated with introduction of computer technology to assist the maintenance of procedures. (Author)

  7. Performing maintenance activities on-line a risk perspective

    International Nuclear Information System (INIS)

    Darling, S.S.; Mairs, T.P.

    1993-01-01

    The US nuclear power industry is attempting to deal with the issue of optimizing the performance of maintenance activities with the advent of the maintenance rule. The impact of any maintenance activity on the safe operation of a nuclear power facility can be quantified on the basis of risk. Therefore, it is incumbent upon the industry to accommodate the regulator and present a maintenance optimization program in terms that explicitly address the potential risk inherent in its concept and implementation. The motivation for utilities to perform maintenance while the plant is operating (i.e., on-line) is readily perceived to offer the following advantages: 1. greater system availability; 2. higher plant capacity factor; 3. more evenly distributed workload for the maintenance department; and 4. overall safer plant operation. However, risks inherent in undertaking maintenance activities during power operation could amount to the realization that reapportionment of these tasks is not cost-beneficial. Therefore, it is important that any utility considering implementing such a paradigm in maintenance philosophy establish a rigorous process to select, perform, and monitor maintenance tasks performed while operating

  8. Sleep less and bite more: sleep disorders associated with occlusal loads during sleep.

    Science.gov (United States)

    Kato, Takafumi; Yamaguchi, Taihiko; Okura, Kazuo; Abe, Susumu; Lavigne, Gilles J

    2013-04-01

    Occlusal overload during sleep is a significant clinical issue that has negative impacts on the maintenance of teeth and the longevity of dental prostheses. Sleep is usually viewed as an 'out-of-functional' mode for masticatory muscles. However, orodental structures and prostheses are not free from occlusal loads during sleep since masticatory muscles can be activated at a low level within normal sleep continuity. Thus, an increase in masticatory muscle contractions, by whatever the cause, can be associated with a risk of increased occlusal loads during sleep. Among such conditions, sleep bruxism (SB) is a type of sleep-related movement disorders with potential load challenge to the tooth and orofacial structures. Patients with SB usually report frequent tooth grinding noises during sleep and there is a consecutive increase in number and strength of rhythmic masticatory muscle activity (RMMA). Other types of masticatory muscle contractions can be non-specifically activated during sleep, such as brief contractions with tooth tapping, sleep talking, non-rhythmic contractions related to non-specific body movements, etc.; these occur more frequently in sleep disorders. Studies have shown that clinical signs and symptoms of SB can be found in patients with sleep disorders. In addition, sleep becomes compromised with aging process, and a prevalence of most sleep disorders is high in the elderly populations, in which prosthodontic rehabilitations are more required. Therefore, the recognition and understanding of the role of sleep disorders can provide a comprehensive vision for prosthodontic rehabilitations when prosthodontists manage complex orodental cases needing interdisciplinary collaborations between dentistry and sleep medicine. Copyright © 2013 Japan Prosthodontic Society. Published by Elsevier Ltd. All rights reserved.

  9. Maximum effort in the minimum-effort game

    Czech Academy of Sciences Publication Activity Database

    Engelmann, Dirk; Normann, H.-T.

    2010-01-01

    Roč. 13, č. 3 (2010), s. 249-259 ISSN 1386-4157 Institutional research plan: CEZ:AV0Z70850503 Keywords : minimum-effort game * coordination game * experiments * social capital Subject RIV: AH - Economics Impact factor: 1.868, year: 2010

  10. Man-rem exposure--a forcing function in remote maintenance of nuclear plants

    International Nuclear Information System (INIS)

    Erion, T.L.

    1979-01-01

    The purpose of this paper is to show the need for remote tooling systems in order to comply with the proposed NRC strategies relative to occupational radiation exposure (ORE) during maintenance outages. In addition to developing tooling to help or remove man from a radiation environment, present efforts to make that environment a less hostile one in the future are underway. A program to decontaminate the channelhead is underway. The obvious benefit of reducing the radiation source strength, and therefore man-rem exposure, has been indicated. Specialized tooling for local decontamination purposes, development of an advanced computer-controlled manipulator, and comprehensive personnel training programs can all reduce downtime and personnel exposures

  11. Methods and tools in development in the field of maintenance; Methodes et outils pour la maintenance en cours de developpement

    Energy Technology Data Exchange (ETDEWEB)

    Le Reverend, D.; Tortolano, M. [Electricite de France (EDF/RD), 78 - Chatou (France); Leniaud, F. [Electricite de France (EDF), Div. Production Nuleaire, 93 - Saint-Denis (France)

    2004-07-01

    This article is dedicated to the maintenance strategy followed by EDF for its nuclear power plants. This strategy is based on the American method RCM (reliability centered method) that has been extended to passive components such as structures and relies on 4 axis. The first axis can be defined as the optimization of maintenance with regard to safety, outage and costs. The aim is to set the border between preventive maintenance and remedial maintenance. The second axis is the condition based maintenance that is the maintenance action that is triggered by the real state of the equipment. This type of maintenance implies the search for reliable and accurate diagnostics. The third axis is the design of simulation and planning tools required for the management of the moving of tools, machinery and spare-parts on a maintenance work site. The fourth axis is the design of tools able to repair some important equipment, this way may be a valid alternative to the replacement of equipment in terms of cost and outage time. (A.C.)

  12. On the Use of Time-Limited Information for Maintenance Decision Support: A Predictive Approach under Maintenance Constraints

    Directory of Open Access Journals (Sweden)

    E. Khoury

    2013-01-01

    Full Text Available This paper deals with a gradually deteriorating system operating under an uncertain environment whose state is only known on a finite rolling horizon. As such, the system is subject to constraints. Maintenance actions can only be planned at imposed times called maintenance opportunities that are available on a limited visibility horizon. This system can, for example, be a commercial vehicle with a monitored critical component that can be maintained only in some specific workshops. Based on the considered system, we aim to use the monitoring data and the time-limited information for maintenance decision support in order to reduce its costs. We propose two predictive maintenance policies based, respectively, on cost and reliability criteria. Classical age-based and condition-based policies are considered as benchmarks. The performance assessment shows the value of the different types of information and the best way to use them in maintenance decision making.

  13. Assessment of diagnostic and prognostic condition indices for efficient and robust maintenance decision-making of systems subject to stress corrosion cracking

    International Nuclear Information System (INIS)

    Huynh, K.T.; Grall, A.; Bérenguer, C.

    2017-01-01

    Seeking condition indices characterizing the health state of a system is a key problem in condition-based maintenance. For this purpose, diagnostic and prognostic models have been unceasingly developed and improved over the past few decades; nevertheless none of them explains thoroughly the impacts of such indices on the effectiveness of maintenance operations. As a complement to these efforts, this paper analyzes the effectiveness of some well-known diagnostic and prognostic indices for maintenance decision-making. The study is based on a system subject to competing risks due to multiple crack paths. A periodic inspection scheme is used to monitor the system health state. Each inspection returns the perfect diagnostic information: the number of cracks, corresponding crack sizes, and the system failure/working state. Based on this information, two kinds of prognostic condition indices are predicted: the average value and probability law of the system residual useful life. The associated condition-based maintenance strategies and cost models are then developed and compared with the ones whose maintenance decisions are based on diagnostic condition indices. The comparison results allow us to conclude on the performance and on the robustness of these strategies, hence giving some suggestions on the choice of reliable condition indices for maintenance decision-making. - Highlights: • Developing a new and generic degradation and failure model. • Synthesizing diagnostic and prognostic condition indices on the basis of the developed degradation and failure model. • Building diagnosis and prognosis-based maintenance strategies, and developing the associated cost models. • Assessing the performance and robustness of the considered strategies to find out reliable indices.

  14. Numerical study of inventory management under various maintenance policies

    NARCIS (Netherlands)

    Poppe, J.; Basten, R.J.I.; Boute, R.N.; Lambrecht, M.R.

    2017-01-01

    Capital assets, such as manufacturing equipment, require maintenance to remain functioning. Maintenance can be performed when a component breaks down and needs replacement (i.e., corrective maintenance), or the maintenance and part replacement can be performed preventively. Preventive maintenance

  15. Maintenance considerations of the STARFIRE commercial tokamak

    International Nuclear Information System (INIS)

    Trachsel, C.A.; Zahn, H.S.; Field, R.E.; Stevens, H.C.

    1979-01-01

    This paper presents the maintenance approach, the commercial tokamak design features that enhance maintenance and preliminary repair time and required mean-time-between-failures for major subsystems. Reactor hall building and maintenance equipment requirements including hot cells, coil rewinding, and cranes are discussed

  16. Development of preventive maintenance procedures and schedules

    International Nuclear Information System (INIS)

    Schlenker, H.V.; Hammel, J.

    1977-01-01

    An outline of the procedures and schedules developed for preventive maintenance in power stations within the Rheinisch-Westfaelisches Elektrizitaetswerk (RWE) is presented. After an introduction of maintenance in general the different kinds of preventive maintenance activities are described. This includes also the prerequisite identification systems. The aims of preventive maintenance and the measures are explained that have to be taken, if these aims are to be achieved. A number of examples from actual practice are cited. (orig.) [de

  17. PFP MICON maintenance manual. Revision 1

    International Nuclear Information System (INIS)

    Silvan, G.R.

    1995-01-01

    This manual covers the use of maintenance displays, maintenance procedures, system alarms and common system failures. This manual is intended to supplement the MICON maintenance training not replace it. It also assumes that the user is familiar with the normal operation of the MICON A/S system. The MICON system is a distributed control computer and, among other things, controls the HVAC system for the Plutonium Finishing Plant

  18. Tandem mirror next step: remote maintenance

    International Nuclear Information System (INIS)

    Doggett, J.N.; Damm, C.C.; Hanson, C.L.

    1980-01-01

    This study of the next proposed experiment in the Mirror Fusion Program, the Tandem Mirror Next Step (TMNS), has included serious consideration of the maintenance requirements of such a large source of high energy neutrons with its attendant throughput of tritium. Although maintenance will be costly in time and money, our conclusion is that with careful attention to a design for maintenance plan such a device can be reliably operated

  19. Integration of infrared thermography into various maintenance methodologies

    Science.gov (United States)

    Morgan, William T.

    1993-04-01

    Maintenance methodologies are in developmental stages throughout the world as global competitiveness drives all industries to improve operational efficiencies. Rapid progress in technical advancements has added an additional strain on maintenance organizations to progressively change. Accompanying needs for advanced training and documentation is the demand for utilization of various analytical instruments and quantitative methods. Infrared thermography is one of the primary elements of engineered approaches to maintenance. Current maintenance methodologies can be divided into six categories; Routine ('Breakdown'), Preventive, Predictive, Proactive, Reliability-Based, and Total Productive (TPM) maintenance. Each of these methodologies have distinctive approaches to achieving improved operational efficiencies. Popular though is that infrared thermography is a Predictive maintenance tool. While this is true, it is also true that it can be effectively integrated into each of the maintenance methodologies for achieving desired results. The six maintenance strategies will be defined. Infrared applications integrated into each will be composed in tabular form.

  20. Value maximizing maintenance policies under general repair

    International Nuclear Information System (INIS)

    Marais, Karen B.

    2013-01-01

    One class of maintenance optimization problems considers the notion of general repair maintenance policies where systems are repaired or replaced on failure. In each case the optimality is based on minimizing the total maintenance cost of the system. These cost-centric optimizations ignore the value dimension of maintenance and can lead to maintenance strategies that do not maximize system value. This paper applies these ideas to the general repair optimization problem using a semi-Markov decision process, discounted cash flow techniques, and dynamic programming to identify the value-optimal actions for any given time and system condition. The impact of several parameters on maintenance strategy, such as operating cost and revenue, system failure characteristics, repair and replacement costs, and the planning time horizon, is explored. This approach provides a quantitative basis on which to base maintenance strategy decisions that contribute to system value. These decisions are different from those suggested by traditional cost-based approaches. The results show (1) how the optimal action for a given time and condition changes as replacement and repair costs change, and identifies the point at which these costs become too high for profitable system operation; (2) that for shorter planning horizons it is better to repair, since there is no time to reap the benefits of increased operating profit and reliability; (3) how the value-optimal maintenance policy is affected by the system's failure characteristics, and hence whether it is worthwhile to invest in higher reliability; and (4) the impact of the repair level on the optimal maintenance policy. -- Highlights: •Provides a quantitative basis for maintenance strategy decisions that contribute to system value. •Shows how the optimal action for a given condition changes as replacement and repair costs change. •Shows how the optimal policy is affected by the system's failure characteristics. •Shows when it is

  1. The Nordic maintenance care program

    DEFF Research Database (Denmark)

    Myburgh, Corrie; Brandborg-Olsen, Dorthe; Albert, Hanne

    2013-01-01

    To describe and interpret Danish Chiropractors' perspectives regarding the purpose and rationale for using MC (maintenance care), its content, course and patient characteristics.......To describe and interpret Danish Chiropractors' perspectives regarding the purpose and rationale for using MC (maintenance care), its content, course and patient characteristics....

  2. Thermoeconomic studies applied to maintenance of power plants

    International Nuclear Information System (INIS)

    Carvalho, F.R.; Horta Nogueira, L.A.

    1996-01-01

    The thermoeconomic method is an important tool aiming to improve maintenance activities in steam power plants, becoming possible to share the irreversibilities costs to each equipment, as boilers, turbines and heat exchangers. Furthermore, the effects related to changes in operational and design parameters can be studied in a detailed way, evaluating the local and distributed effects. In this work, after a brief review of power plant maintenance costs concepts and values, one address a methodology for maintenance costs estimation and develops a case study of thermoeconomics of a hypothetical plant, presenting the exergy flows, exergy losses and maintenance costs distribution. Also is presented an evaluation of exergoeconomic maintenance cost, evaluating their significance, at equipment level, related to overall maintenance cost, aiming to help the maintenance activities planning. 10 refs, 3 figs, 12 tabs

  3. Maintenance in sustainable manufacturing

    Directory of Open Access Journals (Sweden)

    Vladimir Stuchly

    2014-09-01

    Full Text Available Background: Sustainable development is about reaching a balance between economic, social, and environmental goals, as well as people's participation in the planning process in order to gain their input and support. For a company, sustainable development means adoption of such business strategy and actions that contribute to satisfying present needs of company and stakeholders, as well as simultaneous protection, maintenance and strengthening of human and environmental potential which will be needed in the future. This new approach forces manufacturing companies to change their previous management paradigms. New management paradigm should include new issues and develop innovative methods, practices and technologies striving for solving problem of shortages of resources, softening environment overload and enabling development of environment-friendly lifecycle of products. Hence, its realization requires updating existing production models as they are based on previously accepted paradigm of unlimited resources and unlimited regeneration capabilities. Maintenance plays a crucial role because of its impact on availability, reliability, quality and life cycle cost, thus it should be one of the main pillars of new business running model.  Material and methods: The following paper is a result of research on the literature and observation of practices undertaken by a company within maintenance area. Results and conclusions: The main message is that considering sustainable manufacturing requires considerable expanding range of analysis and focusing on supporting processes. Maintenance offers numerous opportunities of decreasing influence of business processes on natural environment and more efficient resources utilization. The goal of maintenance processes realizing sustainable development strategy is increased profitability of exploitation and optimization of total lifecycle cost without disturbing safety and environmental issues. 

  4. Selective maintenance of multi-state systems with structural dependence

    International Nuclear Information System (INIS)

    Dao, Cuong D.; Zuo, Ming J.

    2017-01-01

    This paper studies the selective maintenance problem for multi-state systems with structural dependence. Each component can be in one of multiple working levels and several maintenance actions are possible to a component in a maintenance break. The components structurally form multiple hierarchical levels and dependence groups. A directed graph is used to represent the precedence relations of components in the system. A selective maintenance optimization model is developed to maximize the system reliability in the next mission under time and cost constraints. A backward search algorithm is used to determine the assembly sequence for a selective maintenance scenario. The maintenance model helps maintenance managers in determining the best combination of maintenance activities to maximize the probability of successfully completing the next mission. Examples showing the use of the proposed method are presented. - Highlights: • A selective maintenance model for multi-state systems is proposed considering both economic and structural dependence. • Structural dependence is modeled as precedence relationship when disassembling components for maintenance. • Resources for disassembly and maintenance are evaluated using a backward search algorithm. • Maintenance strategies with and without structural dependence are analyzed. • Ignoring structural dependence may lead to over-estimation of system reliability.

  5. Elimination of maintenance outage and cost reduction by development of outage-free maintenance techniques

    International Nuclear Information System (INIS)

    Jakabe, Hideo; Maruyama, Yoshinaga

    1996-01-01

    The development program of KEPCO on outage-free maintenance techniques for distribution line work since 1984 is overviewed. It has succeeded in eliminating maintenance outages since 1989. The original aim was to improve customer satisfaction. However, in all, four benefits were realised through the development. These are cost reduction, securing of worker safety, improvement of customer service, and advancement of distribution techniques and morale in KEPCO. The introduction of robotic techniques for maintenance work and manipulator techniques for repair work is planned for further modernization. These new techniques are helping in both work safety and work efficiency improvement. Cost reduction and advancement of distribution line work techniques is also considered. (R.P.)

  6. The evolution of the application of mobile robotics to nuclear facility operations and maintenance

    International Nuclear Information System (INIS)

    Carlton, R.E.; Bartholet, S.J.

    1987-01-01

    Application of the concept of mobile robotics to the operation and maintenance of nuclear facilities has evolved over the last four years due, in part, to the efforts of Odetics in the creation of the teleoperated legged transporter. The first step in this evolutionary process was the demonstration of the legged transporter technology, which was accomplished with the design, fabrication and testing of the Odex I functionoid. A second generation ODEX, delivered to the Robotics Technology Group at Savannah River Laboratories, represents the experimental phase of the process. This machine consists of a basic ODEX I transporter body with a unique manipulator arm mounted on a service turret. Currently, the prototype phase of the mobile robotic development effort is underway with the design of the ODEX III which includes enhanced mobility and dexterity, increased intelligence and greater strength in the manipulator arm and transporter

  7. Current Situation of Highway Daily Maintenance Management in Beijing

    Directory of Open Access Journals (Sweden)

    Pan Feng Ming

    2016-01-01

    Full Text Available Combined with the industry property, characteristics and management needs of highway maintenance project in Beijing, through investigation and research of the highway daily maintenance management, the present situation of highway repair and maintenance is expounded from the aspects such as the determination of maintenance funds and plan, maintenance management mode, and so on. Then in order to explore the new mechanisms for market management of highway maintenance, the advantages and disadvantages of highway maintenance and minor repairment of Beijing are analyzed.

  8. Configuration management of on-line maintenance

    International Nuclear Information System (INIS)

    Grantom, C.R.

    1996-01-01

    Maintenance activities are performed on station equipment to ensure continued safe and reliable performance. Equipment reliability is thereby improved, resulting in greater confidence that the component will be capable of performing its intended (safety) function. Probabilistic Safety Assessments (PSAs) consider equipment reliability and availability to calculate Core Damage Frequency (CDF) and other risk-related values. Since maintenance activities are included in PSA analyses, the effect of equipment outages on CDF can be analyzed. Results from these types of studies can be scaled to reflect different time periods and show the time-dependent impact of planned equipment outages on CDF. These time-dependent impacts on CDF are graphically presented and referred to as ''risk profiles''. Risk profiles are being successfully used at the South Texas Project (STP) to plan preventive maintenance activities and to assess the impact of unplanned maintenance activities on plant safety. At STP, planned maintenance activities are scheduled to minimize the risk impact of unavailable equipment and to prevent the Occurrence of undesirable plant configurations. The features of the risk profiles used at STP enable the evaluation of both work scope and duration of maintenance activities to be evaluated. This is possible since the risk profile illustrates both instantaneous CDF effects and cumulative impacts to CDF

  9. Improving nuclear power plant reliability through predictive maintenance

    International Nuclear Information System (INIS)

    Geilhausen, R.; Kunze, U.

    1996-01-01

    Maintenance strategies can be assigned to one of three categories: failure maintenance, periodic maintenance or condition-oriented maintenance. The optimum maintenance scheme can be selected on the basis of a cost-benefit analysis but the safety of life and limb or the political climate for NPP can hardly expressed in numbers. The implementation of preventive maintenance needs two preconditions: high-performance instrumentation in the form of stationary and mobile monitoring systems for the determination of the condition of the nuclear power plant components and provision of a tool that can handle both the organization of the work and the evaluation of the results obtained. (authors)

  10. 25 CFR 170.812 - What is emergency maintenance?

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false What is emergency maintenance? 170.812 Section 170.812 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM BIA Road Maintenance § 170.812 What is emergency maintenance? Emergency maintenance is work that...

  11. Maintenance of scientific instruments

    International Nuclear Information System (INIS)

    Lucero, E.

    1986-01-01

    During the last years Colombia has increased the use of nuclear techniques, instruments and equipment in ambitious health programs, as well as in research centers, industry and education; this has resulted in numerous maintenance problems. As an alternative solution IAN has established a Central Maintenance Laboratory for nuclear instruments within an International Atomic Energy Agency program for eight Latin American and nine Asian Countries. Established strategies and some results are detailed in this writing

  12. Performance-based inspection and maintenance strategies

    International Nuclear Information System (INIS)

    Vesely, W.E.

    1995-01-01

    Performance-based inspection and maintenance strategies utilize measures of equipment performance to help guide inspection and maintenance activities. A relevant measure of performance for safety system components is component unavailability. The component unavailability can also be input into a plant risk model such as a Probabilistic Risk Assessment (PRA) to determine the associated plant risk performance. Based on the present and projected unavailability performance, or the present and projected risk performance, the effectiveness of current maintenance activities can be evaluated and this information can be used to plan future maintenance activities. A significant amount of information other than downtimes or failure times is collected or can be collected when an inspection or maintenance is conducted which can be used to estimate the component unavailability. This information generally involves observations on the condition or state of the component or component piecepart. The information can be detailed such as the amount of corrosion buildup or can be general such as the general state of the component described as ' high degradation', ' moderate degradation', or ' low degradation'. Much of the information collected in maintenance logs is qualitative and fuzzy. As part of an NRC Research program on performance-based engineering modeling, approaches have been developed to apply Fuzzy Set Theory to information collected on the state of the component to determine the implied component or component piecepart unavailability. Demonstrations of the applications of Fuzzy Set Theory are presented utilizing information from plant maintenance logs. The demonstrations show the power of Fuzzy Set Theory in translating engineering information to reliability and risk implications

  13. Proceedings of the third international conference on CANDU maintenance

    International Nuclear Information System (INIS)

    1995-01-01

    The third international conference on Candu maintenance included sessions on the following topics: predictive maintenance, reliability improvements, steam generator monitoring, tools and instrumentation, valve performance, fuel channel inspection and maintenance, steam generator maintenance, environmental qualification, predictive maintenance, instrumentation and control, steam generator cleaning, decontamination and radiation protection, inspection techniques, maintenance program strategies and valve packing experience, remote tooling/ robotics and fuel handling. The individual papers have been abstracted separately

  14. Proceedings of the third international conference on CANDU maintenance

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-12-31

    The third international conference on Candu maintenance included sessions on the following topics: predictive maintenance, reliability improvements, steam generator monitoring, tools and instrumentation, valve performance, fuel channel inspection and maintenance, steam generator maintenance, environmental qualification, predictive maintenance, instrumentation and control, steam generator cleaning, decontamination and radiation protection, inspection techniques, maintenance program strategies and valve packing experience, remote tooling/ robotics and fuel handling. The individual papers have been abstracted separately.

  15. FAA Certificated Maintenance Agencies Directory (1997)

    Science.gov (United States)

    1997-05-06

    This advisory circular (AC) transmits a consolidated directory of all : certificated Federal Aviation Administration (FAA) repair stations and : manufacturer's maintenance facilities. The repair stations and manufacturer's : maintenance facilities we...

  16. The virtual maintenance system: a computer-based support tool for robust design, product monitoring, fault diagnosis and maintenance planning

    NARCIS (Netherlands)

    van Houten, Frederikus J.A.M.; Kimura, F.

    2000-01-01

    Digital (geometric) product models can be used for maintainability analysis and maintenance planning. It is not feasible to build digital product models for maintenance purposes only, but if a digital product model is available, it may be used to support many maintenance-related engineering tasks.

  17. 49 CFR 214.341 - Roadway maintenance machines.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Roadway maintenance machines. 214.341 Section 214... Roadway maintenance machines. (a) Each employer shall include in its on-track safety program specific provisions for the safety of roadway workers who operate or work near roadway maintenance machines. Those...

  18. Evaluation System and Implementation Countermeasure of Automobile Green Maintenance

    Science.gov (United States)

    Zhang, Fei; Xie, Xinxin; Yan, Chaoyong

    2018-01-01

    Green maintenance research is in the beginning of our country, the work is being explored. Based on the existing research results at home and abroad, this paper learns and draws lessons from the experiences and lessons of foreign advanced countries and domestic advanced enterprises. In the face of the challenges brought by economic development and energy saving and emission reduction, this paper discusses the green maintenance theory and security system, And the research status of green maintenance content and system at home and abroad, through the deletion and selection of green maintenance index, through the AHP method to determine the green evaluation criteria, and the introduction of C equivalent evaluation system, the use of fuzzy synthesis Evaluation method to build a green maintenance evaluation model, and the actual validation, put forward the implementation of green maintenance feasibility programs and related security recommendations, vehicle maintenance enterprises to carry out green maintenance, improve business efficiency and reduce environmental management costs to provide theoretical basis. And to achieve effective reduction of environmental pollution, reduce maintenance costs of the target, a reasonable promotion of maintenance and environmental protection and sustainable development. Promote green maintenance from research to practice, from the laboratory to the maintenance of enterprises, from the pilot to the overall development and transformation.

  19. New activities in nuclear power plants maintenance

    International Nuclear Information System (INIS)

    Mico, F.; Specht, J.

    2006-01-01

    This article addresses the consequences of the progressive deregulation of the electricity market of several key countries on the maintenance practices and techniques face to the growing pressures on O and M costs. The responses of the nuclear maintenance industry to make maintenance activities more efficient maintaining if not enhancing the safety of NPP's are briefly described. The article also analyses the potential impact of shortage of experience maintenance personnel to serve the NPP's in the future as some countries are already experiencing. (Author)

  20. Maintenance considerations of the Starfire Commercial Tokamak

    International Nuclear Information System (INIS)

    Trachael, C.A.; Zahn, H.S.; Field, R.E.; Stevens, H.C.

    1979-01-01

    An initial reactor design has been developed for the Starfire Tokamak reactor that incorporates maintenance features to permit reactor and plant operation with a 75% availability. All components of the reactor can be replaced utilizing highly automated remote maintenance techniques. Provisions for contact maintenance are included but would only be utilized on a contingency basis since it is believed that allowable dose rates will be decreased in future years. A modular design approach is used for the reactor and auxiliary subsystems to permit efficient use of remote maintenance. The modular approach minimizes the number of different maintenance operations required and can result in use of simple tasks such as push, pull, turn, etc., maneuvers for module removal. Fault isolation is provided for each replaceable module