WorldWideScience

Sample records for projects quantitaitve analysis

  1. Analysis of Project Finance | Energy Analysis | NREL

    Science.gov (United States)

    Analysis of Project Finance Analysis of Project Finance NREL analysis helps potential renewable energy developers and investors gain insights into the complex world of project finance. Renewable energy project finance is complex, requiring knowledge of federal tax credits, state-level incentives, renewable

  2. Organizational analysis of construction projects

    OpenAIRE

    Hughes, Will

    1989-01-01

    This research project is about the analysis of construction project organizations. The work is based on organizational theory and is a development of Linear Responsibility Analysis (LRA). The aim is to assess the extent to which project success is affected by organizational structure. The analysis of four public sector case studies raises several issues. First is the need for a systematic model of describing and analysing construction project environments. A framework has been developed that ...

  3. Business System Planning Project, Alternatives Analysis

    International Nuclear Information System (INIS)

    EVOSEVICH, S.

    2000-01-01

    The CHG Chief Information Officer (CIO) requested a study of alternatives to the current business system computing environment. This Business Systems Planning (BSP) Project Alternatives Analysis document presents an analysis of the current Project Controls, Work Management, and Business Management systems environment and alternative solutions that support the business functions. The project team has collected requirements and priorities from stakeholders in each business area and documented them in the BSP System Requirements Specification (SRS), RPP-6297. The alternatives analysis process identifies and measures possible solutions in each of the business process areas against the requirements as documented in the SRS. The team gathered input from both internal and external sources to identify and grade the possible solutions. This document captures the results of that activity and recommends a suite of software products. This study was to select the best product based on how well the product met the requirements, not to determine the platform or hardware environment that would be used. Additional analysis documentation can be found in BSP project files

  4. HSAPS market analysis project

    Energy Technology Data Exchange (ETDEWEB)

    Gloeckner, Ronny; Aaberg, Rolf Jarle

    2006-12-15

    The H-SAPS (Hydrogen Stand-Alone Power System) project, an EU project within the ALTENER programme in the period 2002-2004, was initiated to determine the potential for the introduction of environmentally benign hydrogen technology in what is believed to be a near-term market, namely stand-alone power systems (SAPS). The objective of the project was to examine the technological, political, social and economical factors affecting the emergence of hydrogen technology in the stand-alone power system market today and in the future. The scope of the project was limited to small and medium sized stand-alone power systems, up to a few hundred kilowatts (kW) power rating and based on renewable energy as the primary energy source. The work was divided into five phases: (1) Inception, (2) Data collection and analysis, (3) Market analysis and barrier removal, (4) Dissemination, and (5) Final report. Separate reports were written on these topics, and later summarised this final report. The H-SAPS-project identified the following critical technical barriers (in prioritized order): (1) High costs of both electrolyser and fuel cell solutions, (2) Short lifetime warranties and little lifetime experience for PEM electrolysers and PEM fuel cells, (3) Low energy efficiency of the hydrogen energy system (critical for small systems), and (4) The need to develop easy-to-use and energy efficient gas and electricity control systems. One of the main conclusions from the project is that there is a need to focus on interim solutions, based on conventional energy technologies (e.g., internal combustion engines instead of fuel cells), in order for H-SAPS to compete in the near-term SAPS-market (author) (ml)

  5. HSAPS market analysis project

    International Nuclear Information System (INIS)

    Gloeckner, Ronny; Aaberg, Rolf Jarle

    2006-12-01

    The H-SAPS (Hydrogen Stand-Alone Power System) project, an EU project within the ALTENER programme in the period 2002-2004, was initiated to determine the potential for the introduction of environmentally benign hydrogen technology in what is believed to be a near-term market, namely stand-alone power systems (SAPS). The objective of the project was to examine the technological, political, social and economical factors affecting the emergence of hydrogen technology in the stand-alone power system market today and in the future. The scope of the project was limited to small and medium sized stand-alone power systems, up to a few hundred kilowatts (kW) power rating and based on renewable energy as the primary energy source. The work was divided into five phases: (1) Inception, (2) Data collection and analysis, (3) Market analysis and barrier removal, (4) Dissemination, and (5) Final report. Separate reports were written on these topics, and later summarised this final report. The H-SAPS-project identified the following critical technical barriers (in prioritized order): (1) High costs of both electrolyser and fuel cell solutions, (2) Short lifetime warranties and little lifetime experience for PEM electrolysers and PEM fuel cells, (3) Low energy efficiency of the hydrogen energy system (critical for small systems), and (4) The need to develop easy-to-use and energy efficient gas and electricity control systems. One of the main conclusions from the project is that there is a need to focus on interim solutions, based on conventional energy technologies (e.g., internal combustion engines instead of fuel cells), in order for H-SAPS to compete in the near-term SAPS-market (author) (ml)

  6. Flat-plate solar array project. Volume 8: Project analysis and integration

    Science.gov (United States)

    Mcguire, P.; Henry, P.

    1986-01-01

    Project Analysis and Integration (PA&I) performed planning and integration activities to support management of the various Flat-Plate Solar Array (FSA) Project R&D activities. Technical and economic goals were established by PA&I for each R&D task within the project to coordinate the thrust toward the National Photovoltaic Program goals. A sophisticated computer modeling capability was developed to assess technical progress toward meeting the economic goals. These models included a manufacturing facility simulation, a photovoltaic power station simulation and a decision aid model incorporating uncertainty. This family of analysis tools was used to track the progress of the technology and to explore the effects of alternative technical paths. Numerous studies conducted by PA&I signaled the achievement of milestones or were the foundation of major FSA project and national program decisions. The most important PA&I activities during the project history are summarized. The PA&I planning function is discussed and how it relates to project direction and important analytical models developed by PA&I for its analytical and assessment activities are reviewed.

  7. Project management with dynamic scheduling baseline scheduling, risk analysis and project control

    CERN Document Server

    Vanhoucke, Mario

    2013-01-01

    The topic of this book is known as dynamic scheduling, and is used to refer to three dimensions of project management and scheduling: the construction of a baseline schedule and the analysis of a project schedule's risk as preparation of the project control phase during project progress. This dynamic scheduling point of view implicitly assumes that the usability of a project's baseline schedule is rather limited and only acts as a point of reference in the project life cycle.

  8. Streamlining project delivery through risk analysis.

    Science.gov (United States)

    2015-08-01

    Project delivery is a significant area of concern and is subject to several risks throughout Plan Development : Process (PDP). These risks are attributed to major areas of project development, such as environmental : analysis, right-of-way (ROW) acqu...

  9. Solar Market Research and Analysis Projects | Solar Research | NREL

    Science.gov (United States)

    Market Research and Analysis Projects Solar Market Research and Analysis Projects Solar market research and analysis efforts at NREL seek to further solar technologies' role in supporting a more . Midscale Commercial Market Solar Analysis NREL experts are providing analysis to expand the midscale solar

  10. Identifying inaccuracy of MS Project using system analysis

    Science.gov (United States)

    Fachrurrazi; Husin, Saiful; Malahayati, Nurul; Irzaidi

    2018-05-01

    The problem encountered in project owner’s financial accounting report is the difference in total project costs of MS Project to the Indonesian Standard (Standard Indonesia Standard / Cost Estimating Standard Book of Indonesia). It is one of the MS Project problems concerning to its cost accuracy, so cost data cannot be used in an integrated way for all project components. This study focuses on finding the causes of inaccuracy of the MS Projects. The aim of this study, which is operationally, are: (i) identifying cost analysis procedures for both current methods (SNI) and MS Project; (ii) identifying cost bias in each element of the cost analysis procedure; and (iii) analysing the cost differences (cost bias) in each element to identify what the cause of inaccuracies in MS Project toward SNI is. The method in this study is comparing for both the system analysis of MS Project and SNI. The results are: (i) MS Project system in Work of Resources element has limitation for two decimal digits only, have led to its inaccuracy. Where the Work of Resources (referred to as effort) in MS Project represents multiplication between the Quantities of Activities and Requirements of resources in SNI; (ii) MS Project and SNI have differences in the costing methods (the cost estimation methods), in which the SNI uses the Quantity-Based Costing (QBC), meanwhile MS Project uses the Time-Based Costing (TBC). Based on this research, we recommend to the contractors who use SNI should make an adjustment for Work of Resources in MS Project (with correction index) so that it can be used in an integrated way to the project owner’s financial accounting system. Further research will conduct for improvement the MS Project as an integrated tool toward all part of the project participant.

  11. Waste Management Project Contingency Analysis

    International Nuclear Information System (INIS)

    Edward L. Parsons, Jr.

    1999-01-01

    The purpose of this report is to provide the office of Waste Management (WM) with recommended contingency calculation procedures for typical WM projects. Typical projects were defined as conventional construction-type activities that use innovative elements when necessary to meet the project objectives. Projects involve treatment, storage, and disposal of low level, mixed low level, hazardous, transuranic, and high level waste. Cost contingencies are an essential part of Total Cost Management. A contingency is an amount added to a cost estimate to compensate for unexpected expenses resulting from incomplete design, unforeseen and unpredictable conditions, or uncertainties in the project scope (DOE 1994, AACE 1998). Contingency allowances are expressed as percentages of estimated cost and improve cost estimates by accounting for uncertainties. The contingency allowance is large at the beginning of a project because there are more uncertainties, but as a project develops, the allowance shrinks to adjust for costs already incurred. Ideally, the total estimated cost remains the same throughout a project. Project contingency reflects the degree of uncertainty caused by lack of project definition, and process contingency reflects the degree of uncertainty caused by use of new technology. Different cost estimation methods were reviewed and compared with respect to terminology, accuracy, and Cost Guide standards. The Association for the Advancement of Cost Engineering (AACE) methods for cost estimation were selected to represent best industry practice. AACE methodology for contingency analysis can be readily applied to WM Projects, accounts for uncertainties associated with different stages of a project, and considers both project and process contingencies and the stage of technical readiness. As recommended, AACE contingency allowances taper off linearly as a project nears completion

  12. Research reactor job analysis - A project description

    International Nuclear Information System (INIS)

    Yoder, John; Bessler, Nancy J.

    1988-01-01

    Addressing the need of the improved training in nuclear industry, nuclear utilities established training program guidelines based on Performance-Based Training (PBT) concepts. The comparison of commercial nuclear power facilities with research and test reactors owned by the U.S. Department of Energy (DOE), made in an independent review of personnel selection, training, and qualification requirements for DOE-owned reactors pointed out that the complexity of the most critical tasks in research reactors is less than that in power reactors. The U.S. Department of Energy (DOE) started a project by commissioning Oak Ridge Associated Universities (ORAU) to conduct a job analysis survey of representative research reactor facilities. The output of the project consists of two publications: Volume 1 - Research Reactor Job Analysis: Overview, which contains an Introduction, Project Description, Project Methodology,, and. An Overview of Performance-Based Training (PBT); and Volume 2 - Research Reactor Job Analysis: Implementation, which contains Guidelines for Application of Preliminary Task Lists and Preliminary Task Lists for Reactor Operators and Supervisory Reactor Operators

  13. Application of scenario analysis in the investment projects evaluation

    Directory of Open Access Journals (Sweden)

    Brzaković Tomislav

    2016-01-01

    Full Text Available Investing represents an investment in the present to achieve certain effects in the future, and risk is an essential part of the investment process. Scenario analysis involves key risk factors of the project, its sensitivity to changes in key factors and the likelihood of their changes. Scenario analysis allows us to assign probabilities to the base case, the best case and the worst case so that we can find the expected value and standard deviation of the project's NPV to get a better idea of the project's risk. The goal is to determine whether it is possible to make relevant investment decisions on the basis of the parameters of projects risk, such as the standard deviation and the coefficient of variation. The paper is based on a mathematical model, applied to a specific agricultural company. In our case, the project has a wide range of possibilities and a large potential negative value, which suggests a great risk of the project. Although the scenario analysis shows a higher risk, it is not clear if the project should be accepted or not, and therefore, it is necessary to conduct simulation analysis, in order to get reliable answers.

  14. Project MOHAVE data analysis plan

    International Nuclear Information System (INIS)

    Watson, J.G.; Green, M.; Hoffer, T.E.; Lawson, D.R.; Pitchford, M.; Eatough, D.J.; Farber, R.J.; Malm, W.C.; McDade, C.E.

    1993-01-01

    Project MOHAVE is intended to develop ambient and source emissions data for use with source models, receptor models, and data analysis methods in order to explain the nature and causes of visibility degradation in the Grand Canyon. Approximately 50% of the modeling and data analysis effort will be directed toward understanding the contributions from the Mohave Power Project to haze in the Grand Canyon and other nearby Class areas; the remaining resources will be used to understand the contribution from other sources. The major goals of Project MOHAVE and data analysis are: to evaluate the measurement for applicability to modeling and data analysis activities; to describe the visibility, air quality and meteorology during the field study period and to determine the degree to which these measurements represent typical visibility events at the Grand Canyon; to further develop conceptual models of physical and chemical processes which affect visibility impairment at the Grand Canyon; to estimate the contributions from different emission sources to visibility impairment at the Grand Canyon, and to quantitatively evaluate the uncertainties of those estimates; to reconcile different scientific interpretations of the same data and to present this reconciliation to decision-makers. Several different approaches will be applied. Each approach will involve explicit examination of measurement uncertainties, compliance with implicit and explicit assumptions, and representativeness of the measurements. Scientific disagreements will be sought, expressed, explained, quantified, and presented. Data which can be used to verify methods will be withheld for independent evaluation of the validity of those methods. All assumptions will be stated and evaluated against reality. Data analysis results not supporting hypotheses will be presented with those results supporting the hypotheses. Uncertainty statements will be quantitative and consistent with decision-making needs

  15. Improvement of the cost-benefit analysis algorithm for high-rise construction projects

    Directory of Open Access Journals (Sweden)

    Gafurov Andrey

    2018-01-01

    Full Text Available The specific nature of high-rise investment projects entailing long-term construction, high risks, etc. implies a need to improve the standard algorithm of cost-benefit analysis. An improved algorithm is described in the article. For development of the improved algorithm of cost-benefit analysis for high-rise construction projects, the following methods were used: weighted average cost of capital, dynamic cost-benefit analysis of investment projects, risk mapping, scenario analysis, sensitivity analysis of critical ratios, etc. This comprehensive approach helped to adapt the original algorithm to feasibility objectives in high-rise construction. The authors put together the algorithm of cost-benefit analysis for high-rise construction projects on the basis of risk mapping and sensitivity analysis of critical ratios. The suggested project risk management algorithms greatly expand the standard algorithm of cost-benefit analysis in investment projects, namely: the “Project analysis scenario” flowchart, improving quality and reliability of forecasting reports in investment projects; the main stages of cash flow adjustment based on risk mapping for better cost-benefit project analysis provided the broad range of risks in high-rise construction; analysis of dynamic cost-benefit values considering project sensitivity to crucial variables, improving flexibility in implementation of high-rise projects.

  16. Improvement of the cost-benefit analysis algorithm for high-rise construction projects

    Science.gov (United States)

    Gafurov, Andrey; Skotarenko, Oksana; Plotnikov, Vladimir

    2018-03-01

    The specific nature of high-rise investment projects entailing long-term construction, high risks, etc. implies a need to improve the standard algorithm of cost-benefit analysis. An improved algorithm is described in the article. For development of the improved algorithm of cost-benefit analysis for high-rise construction projects, the following methods were used: weighted average cost of capital, dynamic cost-benefit analysis of investment projects, risk mapping, scenario analysis, sensitivity analysis of critical ratios, etc. This comprehensive approach helped to adapt the original algorithm to feasibility objectives in high-rise construction. The authors put together the algorithm of cost-benefit analysis for high-rise construction projects on the basis of risk mapping and sensitivity analysis of critical ratios. The suggested project risk management algorithms greatly expand the standard algorithm of cost-benefit analysis in investment projects, namely: the "Project analysis scenario" flowchart, improving quality and reliability of forecasting reports in investment projects; the main stages of cash flow adjustment based on risk mapping for better cost-benefit project analysis provided the broad range of risks in high-rise construction; analysis of dynamic cost-benefit values considering project sensitivity to crucial variables, improving flexibility in implementation of high-rise projects.

  17. Russian Language Analysis Project

    Science.gov (United States)

    Serianni, Barbara; Rethwisch, Carolyn

    2011-01-01

    This paper is the result of a language analysis research project focused on the Russian Language. The study included a diverse literature review that included published materials as well as online sources in addition to an interview with a native Russian speaker residing in the United States. Areas of study include the origin and history of the…

  18. Network theory-based analysis of risk interactions in large engineering projects

    International Nuclear Information System (INIS)

    Fang, Chao; Marle, Franck; Zio, Enrico; Bocquet, Jean-Claude

    2012-01-01

    This paper presents an approach based on network theory to deal with risk interactions in large engineering projects. Indeed, such projects are exposed to numerous and interdependent risks of various nature, which makes their management more difficult. In this paper, a topological analysis based on network theory is presented, which aims at identifying key elements in the structure of interrelated risks potentially affecting a large engineering project. This analysis serves as a powerful complement to classical project risk analysis. Its originality lies in the application of some network theory indicators to the project risk management field. The construction of the risk network requires the involvement of the project manager and other team members assigned to the risk management process. Its interpretation improves their understanding of risks and their potential interactions. The outcomes of the analysis provide a support for decision-making regarding project risk management. An example of application to a real large engineering project is presented. The conclusion is that some new insights can be found about risks, about their interactions and about the global potential behavior of the project. - Highlights: ► The method addresses the modeling of complexity in project risk analysis. ► Network theory indicators enable other risks than classical criticality analysis to be highlighted. ► This topological analysis improves project manager's understanding of risks and risk interactions. ► This helps project manager to make decisions considering the position in the risk network. ► An application to a real tramway implementation project in a city is provided.

  19. Linguistic analysis of project ownership for undergraduate research experiences.

    Science.gov (United States)

    Hanauer, D I; Frederick, J; Fotinakes, B; Strobel, S A

    2012-01-01

    We used computational linguistic and content analyses to explore the concept of project ownership for undergraduate research. We used linguistic analysis of student interview data to develop a quantitative methodology for assessing project ownership and applied this method to measure degrees of project ownership expressed by students in relation to different types of educational research experiences. The results of the study suggest that the design of a research experience significantly influences the degree of project ownership expressed by students when they describe those experiences. The analysis identified both positive and negative aspects of project ownership and provided a working definition for how a student experiences his or her research opportunity. These elements suggest several features that could be incorporated into an undergraduate research experience to foster a student's sense of project ownership.

  20. Analysis and control of issues that delay pharmaceutical projects

    Directory of Open Access Journals (Sweden)

    Nallam Sai Nandeswara Rao

    2015-10-01

    Full Text Available Every project will have certain objectives and service levels to be achieved. The success of a project depends on several dimensions like time, cost/budget, quality, etc. and managing a project involves completing the project within time, within budget and with quality to satisfy the users. Because of the significance of health, pharmaceutical companies realized the importance of project management methods and techniques to make available the life saving drugs in time to the needy patients and hospitals. In literature, there is meager information about pharmaceutical project management oriented towards analysis of issues and factors that contribute to the failure or success of projects. This study attempts to analyse different issues that contribute to time delays in pharmaceutical product-based projects, group them under a finite set of prominent factors and identify remedial measures to control those delays. The feedback of project people of some big pharmaceutical firms of Indian sub-continent was collected for this purpose. Exploratory factor analysis (EFA has been used to reduce the reasons for time delays to a limited number of prominent factors and the EFA model has been further examined by confirmatory factor analysis (CFA for its validation. Remedial measures under each factor of time delays have been gathered and a framework designed to mitigate the time delays in pharmaceutical projects. The derived factors that delay the pharmaceutical projects include resource, monitoring & control, scheduling and planning problems. Important remedial measures like blended resource approach, estimation and forecast of shortage of labour and skills, regular quality training, etc. have been recommended.

  1. Analysis of interactions among barriers in project risk management

    Science.gov (United States)

    Dandage, Rahul V.; Mantha, Shankar S.; Rane, Santosh B.; Bhoola, Vanita

    2018-03-01

    In the context of the scope, time, cost, and quality constraints, failure is not uncommon in project management. While small projects have 70% chances of success, large projects virtually have no chance of meeting the quadruple constraints. While there is no dearth of research on project risk management, the manifestation of barriers to project risk management is a less dwelt topic. The success of project management is oftentimes based on the understanding of barriers to effective risk management, application of appropriate risk management methodology, proactive leadership to avoid barriers, workers' attitude, adequate resources, organizational culture, and involvement of top management. This paper represents various risk categories and barriers to risk management in domestic and international projects through literature survey and feedback from project professionals. After analysing the various modelling methods used in project risk management literature, interpretive structural modelling (ISM) and MICMAC analysis have been used to analyse interactions among the barriers and prioritize them. The analysis indicates that lack of top management support, lack of formal training, and lack of addressing cultural differences are the high priority barriers, among many others.

  2. RISK ANALYSIS FOR SHIP CONVERTING PROJECT ACCOMPLISHMENT (Case study of KRI KP Converting Project

    Directory of Open Access Journals (Sweden)

    Dimas Endro W

    2013-10-01

    Full Text Available Ship converting has become as prospective activity in ship building area. Operational and economical aspect are the most dominant rationale. Baseon a new fuction of converted ship, a task list which contain several jobs that must be done is listed. This accomplishment schedule not only contain a task list, but also duration for certain job title. In practical apllication job duration is maintained based on experience of project manager.  Further more, total accomplish duration is setted as time accomplishment for the project. This setted time has become reference for the project bid. Occasionaly, if accomplishment time which offered is strict, than schedule slip become as potencial nightmare. For this situation, project manager has had a cristal clearconsideration to select a proper decision wheter he will take the tender offer or not. practically, project mananger has layed on his experience to handle previous project and face  penalty if the project delayed. This paper focussed on how to measure tender offer based on risk analysis, specially for converted ship tender which has a strike time accomplishment.A new application method to analysis proposed tender based on time and penalty parameter has become a topic of this paper.

  3. Project delay analysis of HRSG

    Science.gov (United States)

    Silvianita; Novega, A. S.; Rosyid, D. M.; Suntoyo

    2017-08-01

    Completion of HRSG (Heat Recovery Steam Generator) fabrication project sometimes is not sufficient with the targeted time written on the contract. The delay on fabrication process can cause some disadvantages for fabricator, including forfeit payment, delay on HRSG construction process up until HRSG trials delay. In this paper, the author is using semi quantitative on HRSG pressure part fabrication delay with configuration plant 1 GT (Gas Turbine) + 1 HRSG + 1 STG (Steam Turbine Generator) using bow-tie analysis method. Bow-tie analysis method is a combination from FTA (Fault tree analysis) and ETA (Event tree analysis) to develop the risk matrix of HRSG. The result from FTA analysis is use as a threat for preventive measure. The result from ETA analysis is use as impact from fabrication delay.

  4. Economic analysis of radioactive waste storage and disposal projects

    International Nuclear Information System (INIS)

    Kleinen, P.J.; Starnes, R.B.

    1995-01-01

    Radioactive waste storage and disposal efforts present challenging issues for cost and economic analyses. In particular, legal requirements for states and compact areas to develop radioactive waste disposal sites, combined with closure of some sites, have placed urgency on planning, locating, and constructing storage and disposal sites. Cost analyses of potential projects are important to the decision processes. Principal objectives for cost analyses for projects are to identify all activities, covering the entire project life cycle, and to develop costs for those activities using methods that allow direct comparisons between competing project alternatives. For radioactive waste projects, long project lives ranging from tens of years to 100 or more years must be considered. Alternative, and competing, technologies, designs, and operating plans must be evaluated. Thorough base cost estimates must be made for all project phases: planning, development, licensing/permitting, construction, operations, and maintenance, closure, and post-closure/institutional care. Economic analysis procedures need to accommodate the specific features of each project alternative and facilitate cost comparisons between differing alternatives. Economic analysis assumptions must be developed to address the unusually long project lives involved in radioactive waste projects

  5. Real Options Analysis of Mining Projects

    OpenAIRE

    Rudolf Zdravlje

    2011-01-01

    When long life assets are being evaluated based on constant predictions of future variables and the assumptions of zero management flexibility, is value being missed? In project evaluation today, the most common evaluation methods that calculate a net present value are discounted cash flow (DCF) analysis, decision tree analysis and Monte Carlo simulation. A fourth method, which is beginning to gain ground in terms of its use in the mining industry, is real option analysis (ROA). ROA utilizes ...

  6. The economics of project analysis: Optimal investment criteria and methods of study

    Science.gov (United States)

    Scriven, M. C.

    1979-01-01

    Insight is provided toward the development of an optimal program for investment analysis of project proposals offering commercial potential and its components. This involves a critique of economic investment criteria viewed in relation to requirements of engineering economy analysis. An outline for a systems approach to project analysis is given Application of the Leontief input-output methodology to analysis of projects involving multiple processes and products is investigated. Effective application of elements of neoclassical economic theory to investment analysis of project components is demonstrated. Patterns of both static and dynamic activity levels are incorporated.

  7. Justification of investment projects of biogas systems by the sensitivity analysis

    Directory of Open Access Journals (Sweden)

    Perebijnos Vasilij Ivanovich

    2015-06-01

    Full Text Available Methodical features of sensitivity analysis application for evaluation of biogas plants investment projects are shown in the article. Risk factors of the indicated investment projects have been studied. Methodical basis for the use of sensitivity analysis and calculation of elasticity coefficient has been worked out. Calculation of sensitivity analysis and elasticity coefficient of three biogas plants projects, which differ in direction of biogas transformation: use in co-generation plant, application of biomethane as motor fuel and resulting carbon dioxide as marketable product, has been made. Factors strongly affecting projects efficiency have been revealed.

  8. Research Progress in Mathematical Analysis of Map Projection by Computer Algebra

    Directory of Open Access Journals (Sweden)

    BIAN Shaofeng

    2017-10-01

    Full Text Available Map projection is an important component of modern cartography, and involves many fussy mathematical analysis processes, such as the power series expansions of elliptical functions, differential of complex and implicit functions, elliptical integral and the operation of complex numbers. The derivation of these problems by hand not only consumes much time and energy but also makes mistake easily, and sometimes can not be realized at all because of the impossible complexity. The research achievements in mathematical analysis of map projection by computer algebra are systematically reviewed in five aspects, i.e., the symbolic expressions of forward and inverse solution of ellipsoidal latitudes, the direct transformations between map projections with different distortion properties, expressions of Gauss projection by complex function, mathematical analysis of oblique Mercator projection, polar chart projection with its transformation. Main problems that need to be further solved in this research field are analyzed. It will be helpful to promote the development of map projection.

  9. A Conceptual Grey Analysis Method for Construction Projects

    Directory of Open Access Journals (Sweden)

    Maria Mikela Chatzimichailidou

    2015-05-01

    Full Text Available Concerning engineers, project management is a crucial field of research and development. Projects of high uncertainty and scale are characterized by risk, primarily related to their completion time. Thus, safe duration estimations, throughout the planning of a project, are a key objective for project managers. However, traditional linear approaches fail to include and sufficiently serve the dynamic nature of activities duration. On this ground, attention should be paid to designing and implementing methodologies that approximate the duration of the activities during the phase of planning and scheduling too. The grey analysis mathematical modeling seems to gain grounds, since it gradually becomes a well-adapted and up-to-date technique for numerous scientific sectors. This paper examines the contribution of the logic behind the aforementioned analysis, aiming to predict possible future divergences of task durations in big construction projects. Based on time observations of critical instances, a conceptual method is developed for making duration estimations and communicating deviations from the original schedule, in a way that approximations will fit reality better. The whole procedure endeavors to investigate the decrease of uncertainty, regarding project completion time and reduce, up to a scale, a possible inaccurate estimation of a project manager. The utmost effort is about exploiting the gained experience and eliminating the “hedgehog syndrome”. This is attainable by designing a reliable, easily updated, and readable information system. An enlightening example is to be found in the last section.

  10. Flash Study Analysis and the Music Learning Pro-Files Project

    Science.gov (United States)

    Cremata, Radio; Pignato, Joseph; Powell, Bryan; Smith, Gareth Dylan

    2016-01-01

    This paper introduces the Music Learning Profiles Project, and its methodological approach, flash study analysis. Flash study analysis is a method that draws heavily on extant qualitative approaches to education research, to develop broad understandings of music learning in diverse contexts. The Music Learning Profiles Project (MLPP) is an…

  11. SPEACH project needs analysis : summary of the needs analysis

    NARCIS (Netherlands)

    de Jong, Johan

    2015-01-01

    The overall objective of the SPEACH project needs analysis (work package 2, WP2) was to gather input on the needs and wishes of selected target groups within the field of physical education (PE) and Sport Coaching. Both individual and organisational perspectives were represented. Focus has been on

  12. IoT Platforms: Analysis for Building Projects

    Directory of Open Access Journals (Sweden)

    Rusu Liviu DUMITRU

    2017-01-01

    Full Text Available This paper presents a general survey of IoT platforms in terms of features for IoT project de-velopers. I will briefly summarize the state of knowledge in terms of technology regarding “In-ternet of Things” first steps in developing this technology, history, trends, sensors and micro-controllers used. I have evaluated a number of 5 IoT platforms in terms of the features needed to develop a IoT project. I have listed those components that are most appreciated by IoT pro-ject developers and the results have been highlighted in a comparative analysis of these plat-forms from the point of view of IoT project developers and which are strictly necessary as a de-velopment environment for an IoT project based. I’ve also considered the users' views of such platforms in terms of functionality, advantages, disadvantages and dangers presented by this technology.

  13. 2D Affine and Projective Shape Analysis.

    Science.gov (United States)

    Bryner, Darshan; Klassen, Eric; Huiling Le; Srivastava, Anuj

    2014-05-01

    Current techniques for shape analysis tend to seek invariance to similarity transformations (rotation, translation, and scale), but certain imaging situations require invariance to larger groups, such as affine or projective groups. Here we present a general Riemannian framework for shape analysis of planar objects where metrics and related quantities are invariant to affine and projective groups. Highlighting two possibilities for representing object boundaries-ordered points (or landmarks) and parameterized curves-we study different combinations of these representations (points and curves) and transformations (affine and projective). Specifically, we provide solutions to three out of four situations and develop algorithms for computing geodesics and intrinsic sample statistics, leading up to Gaussian-type statistical models, and classifying test shapes using such models learned from training data. In the case of parameterized curves, we also achieve the desired goal of invariance to re-parameterizations. The geodesics are constructed by particularizing the path-straightening algorithm to geometries of current manifolds and are used, in turn, to compute shape statistics and Gaussian-type shape models. We demonstrate these ideas using a number of examples from shape and activity recognition.

  14. Analysis and Countermeasures of PPP Project Implementation Difficulties

    Directory of Open Access Journals (Sweden)

    Xu Yifeng

    2017-01-01

    Full Text Available Since the beginning of 1995, the model of PPP project construction was introduced in China. It has been widely used in many fields such as energy, municipal, and so on. It has accumulated a lot of experience in improving the investment system structure and guiding the social capital into the infrastructure field. But the mode of PPP project construction in the implementing process in different environment often encounters a lot of problems. Based on a large amount of analysis on the existing literature, this paper resorts out the PPP project model combining the problems occurred in the implementation process of PPP project, and summarizes corresponding countermeasures aiming at the problems in order to provide help for PPP project implementation in the future.

  15. Space Mission Human Reliability Analysis (HRA) Project

    Data.gov (United States)

    National Aeronautics and Space Administration — The purpose of this project is to extend current ground-based Human Reliability Analysis (HRA) techniques to a long-duration, space-based tool to more effectively...

  16. COGNITIVE MODELING AS A METHOD OF QUALITATIVE ANALYSIS OF IT PROJECTS

    Directory of Open Access Journals (Sweden)

    Інна Ігорівна ОНИЩЕНКО

    2016-03-01

    Full Text Available The example project implementing automated CRM-system demonstrated the possibility and features of cognitive modeling in the qualitative analysis of project risks to determine their additional features. Proposed construction of cognitive models of project risks in information technology within the qualitative risk analysis, additional assessments as a method of ranking risk to characterize the relationship between them. The proposed cognitive model reflecting the relationship between the risk of IT project to assess the negative and the positive impact of certain risks for the remaining risks of project implementation of the automated CRM-system. The ability to influence the risk of a fact of other project risks can increase the priority of risk with low impact on results due to its relationship with other project risks.

  17. Plutonium Finishing Plant Transition Project mission analysis report

    International Nuclear Information System (INIS)

    Courson, D.B.

    1994-01-01

    This report defines the mission for the Plutonium Finishing Plant Transition Project (PFPTP) using a systems engineering approach. This mission analysis will be the basis for the functional analysis which will further define and break down the mission statement into all of the detailed functions required to accomplish the mission. The functional analysis is then used to develop requirements, allocate those requirements to functions, and eventually be used to design the system. This report: presents the problem which will be addressed, defines PFP Transition Project, defines the overall mission statement, describes the existing, initial conditions, defines the desired, final conditions, identifies the mission boundaries and external interfaces, identifies the resources required to carry out the mission, describes the uncertainties and risks, and discusses the measures which will be used to determine success

  18. Construction Project Success ranking through the Data Envelopment Analysis

    Directory of Open Access Journals (Sweden)

    Mazyar Zahedi-Seresht

    2014-09-01

    Full Text Available The purpose of this paper is to rank construction projects' success in a post delivery phase. To attain this objective, a data envelopment analysis (DEA approach is used. The model's output is a project success index which is calculated based on five project success criteria. These criteria which are determined by a two-round Delphi questionnaire survey are time performance, cost performance, quality, HSE, and customer satisfaction. The input factors which have effects on the output measures are Organizational Sponsorship, Project Manager Competency, Customer Organization, Project Operational Environment and Organizational Experience. The tool adopted to determine these factors is questionnaire. This model is applied for 9 projects with different importance of output and input factors and the reasonable result is achieved for ranking these projects.

  19. Time-Frequency Analysis and Hermite Projection Method Applied to Swallowing Accelerometry Signals

    Directory of Open Access Journals (Sweden)

    Ervin Sejdić

    2010-01-01

    Full Text Available Fast Hermite projections have been often used in image-processing procedures such as image database retrieval, projection filtering, and texture analysis. In this paper, we propose an innovative approach for the analysis of one-dimensional biomedical signals that combines the Hermite projection method with time-frequency analysis. In particular, we propose a two-step approach to characterize vibrations of various origins in swallowing accelerometry signals. First, by using time-frequency analysis we obtain the energy distribution of signal frequency content in time. Second, by using fast Hermite projections we characterize whether the analyzed time-frequency regions are associated with swallowing or other phenomena (vocalization, noise, bursts, etc.. The numerical analysis of the proposed scheme clearly shows that by using a few Hermite functions, vibrations of various origins are distinguishable. These results will be the basis for further analysis of swallowing accelerometry to detect swallowing difficulties.

  20. ADP Analysis project for the Human Resources Management Division

    Science.gov (United States)

    Tureman, Robert L., Jr.

    1993-01-01

    The ADP (Automated Data Processing) Analysis Project was conducted for the Human Resources Management Division (HRMD) of NASA's Langley Research Center. The three major areas of work in the project were computer support, automated inventory analysis, and an ADP study for the Division. The goal of the computer support work was to determine automation needs of Division personnel and help them solve computing problems. The goal of automated inventory analysis was to find a way to analyze installed software and usage on a Macintosh. Finally, the ADP functional systems study for the Division was designed to assess future HRMD needs concerning ADP organization and activities.

  1. Assessment of Smolt Condition for Travel Time Analysis Project, 1987-1997 Project Review.

    Energy Technology Data Exchange (ETDEWEB)

    Schrock, Robin M.; Hans, Karen M.; Beeman, John W. [US Geological Survey, Western Fisheries Research Center, Columbia River Research Laboratory, Cook, WA

    1997-12-01

    The assessment of Smolt Condition for Travel Time Analysis Project (Bonneville Power Administration Project 87-401) monitored attributes of salmonid smolt physiology in the Columbia and Snake River basins from 1987 to 1997, under the Northwest Power Planning Council Fish and Wildlife Program, in cooperation with the Smolt Monitoring Program of the Fish Passage Center. The primary goal of the project was to investigate the physiological development of juvenile salmonids related to migration rates. The assumption was made that the level of smolt development, interacting with environmental factos such as flow, would be reflected in travel times. The Fish Passage Center applied the physiological measurements of smolt condition to Water Budget management, to regulate flows so as to decrease travel time and increase survival.

  2. Fast Missile Boat Project Planning using CPM and What If Analysis Method

    Science.gov (United States)

    Silvianita; Firmansyah, R.; Rosyid, D. M.; Suntoyo; Chamelia, D. M.

    2018-03-01

    This paper discusses analysis of fast ship missile project planning with CPM and What If analysis.The poor performance can cause project delay and cost overruns, these two things often occur in a project management. Scheduling has an important role to control the project. Good scheduling is required because it will affect the product quality. Scheduling is useful to manage the activities so that the project completion time can be as short as possible and it is used to determine the costs of the project are in optimum condition. The alternatives that can be used to overcome the delay project namely increasing labor and equipment.Project planning can be done to determine whether the project is already in an optimum condition. Alternatives that can be used to overcome the delay in the project is to increase labor and equipment, the next is to look for the optimum solution taking into account the duration and gain of each alternative.

  3. A sustainability analysis of the Brazilian multipurpose reactor project

    International Nuclear Information System (INIS)

    Obadia, I.J.; Perrotta, J.A.

    2010-01-01

    The project of a new research reactor in Brazil for radioisotope production, support of the nuclear energy program and scientific research has received a positive sign of the government and is starting to be developed by the Brazilian Commission of Nuclear Energy. International Atomic Energy Agency points out that the implementation of a new research reactor is a major undertaking for a country, requiring an analysis to identify to which extent the conditions of the national nuclear program are proper and adequate to lead to a sustainable research reactor life cycle. This paper introduces the Brazilian Multipurpose Reactor Project (RMB) and describes the sustainability analysis performed, which has shown that the national nuclear infrastructure presents a very favourable condition to the implementation of the RMB project as well as to provide a sustainable life cycle for this new research reactor. (author)

  4. Fault tree analysis of Project S-4404, Upgrade Canyon Exhaust System

    International Nuclear Information System (INIS)

    Browne, E.V.; Low, J.M.; Lux, C.R.

    1992-01-01

    Project S-4404, Upgrade Canyon Exhaust Systems, is a $177 million project with the purpose of upgrading the Exhaust Systems for both F and H Canyon Facilities. This upgrade will replace major portions of the F and H-Canyon exhaust systems, downstream of their respective sand filters with higher capacity and more reliable systems. Because of the high cost, DOE requested Program Control ampersand Integration (PC ampersand I) to examine specific deletions to the project. PC ampersand I requested Nuclear Processes Safety Research (NPSR) to perform an analysis to compare failure rates for the existing F ampersand H Canyon exhaust systems with the proposed exhaust system and specific proposed exhaust system alternatives. The objective of this work was to perform an analysis and compare failure rates for the existing F ampersand H Canyon exhaust systems with the proposed project exhaust system and proposed project alternatives. Based on fault tree analysis, two conclusions are made. First, D ampersand D activities can be eliminated from the project with no significant decrease to exhaust system safety. Deletion of D ampersand D activities would result in a cost savings of $29 million. Second, deletion of DOE Order 6430.1A requirements regarding DBAs would decrease exhaust system safety by a factor of 12

  5. Parametric image reconstruction using spectral analysis of PET projection data

    International Nuclear Information System (INIS)

    Meikle, Steven R.; Matthews, Julian C.; Cunningham, Vincent J.; Bailey, Dale L.; Livieratos, Lefteris; Jones, Terry; Price, Pat

    1998-01-01

    Spectral analysis is a general modelling approach that enables calculation of parametric images from reconstructed tracer kinetic data independent of an assumed compartmental structure. We investigated the validity of applying spectral analysis directly to projection data motivated by the advantages that: (i) the number of reconstructions is reduced by an order of magnitude and (ii) iterative reconstruction becomes practical which may improve signal-to-noise ratio (SNR). A dynamic software phantom with typical 2-[ 11 C]thymidine kinetics was used to compare projection-based and image-based methods and to assess bias-variance trade-offs using iterative expectation maximization (EM) reconstruction. We found that the two approaches are not exactly equivalent due to properties of the non-negative least-squares algorithm. However, the differences are small ( 1 and, to a lesser extent, VD). The optimal number of EM iterations was 15-30 with up to a two-fold improvement in SNR over filtered back projection. We conclude that projection-based spectral analysis with EM reconstruction yields accurate parametric images with high SNR and has potential application to a wide range of positron emission tomography ligands. (author)

  6. Undergraduate degree projects in the Swedish dental schools: a documentary analysis.

    Science.gov (United States)

    Franzén, C; Brown, G

    2013-05-01

    Undergraduate degree projects have currently been introduced into courses in the four Swedish dental schools. The rationale for research projects is that they enable students to develop research expertise skills and to show their ability to apply and develop knowledge relevant to professional practice. This paper reports a qualitative analysis of the curriculum documents and handbooks including the criteria used to assess the students' research reports. The aim was to investigate commonalities and differences in the design of degree projects between the four Swedish dental schools and to explore any inconsistencies within the documents. The documentary analysis was based on the constant comparison method. Four overarching themes emerged from the analysis: (i) developing scientific expertise, (ii) developing professional expertise, (iii) following rules and (iv) fostering creativity. The documents from the four dental schools revealed similar views on the purposes of the projects and provided similar assessment criteria. The students were requested to formulate an odontological problem, apply a relevant scientific method, analyse texts and empirical data, express critical reflections and write a short thesis. The students were free to choose topics. There were differences between the dental schools on the emphasis placed on practical uses of the projects and theoretical background of the projects. Two of the schools insisted on rigid rules of completing and writing the project yet paradoxically emphasised creativity. There were wide variations in the required length of the project report. The report may prove useful to dental schools in other countries who are about to design undergraduate research projects. © 2013 John Wiley & Sons A/S. Published by Blackwell Publishing Ltd.

  7. Ontological Analysis of the Project Risk Management Concept ‘Risk’

    Directory of Open Access Journals (Sweden)

    Uzulāns Juris

    2018-02-01

    Full Text Available The aim of the current research series is to examine the definitions of the concept ‘risk’ and analyze the concepts used in the definitions of ‘risk’ in the sources of these definitions in order to perform the ontological analysis of the concept of ‘risk’. Ontological and epistemological analysis of the concepts in the definition of the concept ‘risk’ was used to answer the question what ‘risk’ means in project management. This investigation represents a part of the research series where the ontological, epistemological and methodological analysis of project risk is performed with the aim to improve risk registers and risk management as a whole. In the previous studies the author analyzed the concept of ‘event’ that defines the content of the concept ‘risk’. The use of ‘event’ was analyzed in different sources to find out how the concept should be used. The ontological, epistemological and methodological analysis of the definitions of the concept ‘risk’ is the theoretical foundation for risk register creation because it is possible to create complete and understandable register for the participants of the project risk management process. The author believes that the conducted research helps establish confidence that ontological analysis is the method that together with the epistemological and methodological analysis provides opportunity to perform analysis of risk management sources aimed at improving risk management. The results of the study cannot be considered sufficient for deriving valid conclusions about project risk management and developing recommendations for improving risk management with regard to the content of the risk register. For valid conclusions and recommendations, a deeper research is needed which, first of all, would analyze a larger number of sources.

  8. Requirements Analysis Study for Master Pump Shutdown System Project Development Specification

    International Nuclear Information System (INIS)

    BEVINS, R.R.

    2000-01-01

    This study is a requirements document that presents analysis for the functional description for the master pump shutdown system. This document identifies the sources of the requirements and/or how these were derived. Each requirement is validated either by quoting the source or an analysis process involving the required functionality, performance characteristics, operations input or engineering judgment. The requirements in this study apply to the first phase of the W314 Project. This document has been updated during the definitive design portion of the first phase of the W314 Project to capture additional software requirements and is planned to be updated during the second phase of the W314 Project to cover the second phase of the project's scope

  9. A sustainability analysis of an incineration project in Serbia.

    Science.gov (United States)

    Mikic, Miljan; Naunovic, Zorana

    2013-11-01

    The only option for municipal solid waste (MSW) treatment adopted so far in Serbia is landfilling. Similarly to other south-eastern European countries, Serbia is not recovering any energy from MSW. Fifty percent of electricity in Serbia is produced in coal-fired power plants with emission control systems dating from the 1980s. In this article, the option of MSW incineration with energy recovery is proposed and examined for the city of Novi Sad. A sustainability analysis consisting of financial, economic and sensitivity analyses was done in the form of a cost-benefit analysis following recommendations from the European Commission. Positive and negative social and environmental effects of electricity generation through incineration were valuated partly using conversion factors and shadow prices, and partly using the results of previous studies. Public aversion to MSW incineration was considered. The results showed that the incineration project would require external financial assistance, and that an increase of the electricity and/or a waste treatment fee is needed to make the project financially positive. It is also more expensive than the landfilling option. However, the economic analysis showed that society would have net benefits from an incineration project. The feed-in tariff addition of only €0.03 (KWh)(-1) to the existing electricity price, which would enable the project to make a positive contribution to economic welfare, is lower than the actual external costs of electricity generation from coal in Serbia.

  10. Pilot Project: analysis, development and projection

    OpenAIRE

    Tapia Abril, Verónica Emilia; Chérrez Rodas, Karina; García Pesántez, Gabriela Rosana; Maldonado Marchán, María Elisa; Bustamante Montesdeoca, José Luis

    2014-01-01

    Since the introduction of ICT in architecture and teaching, pedagogies of education have faced their learning paradigms change. Institutes of higher education have folded to this motion and have undergone a process of change by implementing multimedia elements in their subjects. Through the pilot project educational videos that aim to meet the highest standards of educational videos described by Van Dam have been developed. The project expects to generate educational videos for different depa...

  11. Regional climate projections for the MENA-CORDEX domain: analysis of projected temperature and precipitation changes

    Science.gov (United States)

    Hänsler, Andreas; Weber, Torsten; Eggert, Bastian; Saeed, Fahad; Jacob, Daniela

    2014-05-01

    Within the CORDEX initiative a multi-model suite of regionalized climate change information will be made available for several regions of the world. The German Climate Service Center (CSC) is taking part in this initiative by applying the regional climate model REMO to downscale global climate projections of different coupled general circulation models (GCMs) for several CORDEX domains. Also for the MENA-CORDEX domain, a set of regional climate change projections has been established at the CSC by downscaling CMIP5 projections of the Max-Planck-Institute Earth System Model (MPI-ESM) for the scenarios RCP4.5 and RCP8.5 with the regional model REMO for the time period from 1950 to 2100 to a horizontal resolution of 0.44 degree. In this study we investigate projected changes in future climate conditions over the domain towards the end of the 21st century. Focus in the analysis is given to projected changes in the temperature and rainfall characteristics and their differences for the two scenarios will be highlighted.

  12. Microcomputer model for an analysis of the financial feasibility of a mining project

    International Nuclear Information System (INIS)

    Ciruelos, J.; Duchene, M.

    1983-01-01

    The model presented permits a simulation of the predicted profitability of a mining project at the stage of feasibility studies by making use of a simple individual computer, the Apple II. The model presented can be used to treat the following three areas: definition of the mode of financing the project and calculation of the financial flows which make it possible to evaluate the profitability of this project; analysis of sensitivity, which makes it possible to determine the most critical variables for the future of the project; analysis of the risk [fr

  13. Mobile Learning Projects - a critical analysis of the state of the art

    OpenAIRE

    Frohberg, D; Göth, C; Schwabe, G

    2009-01-01

    A brief narrative description of the journal article, document, or resource. This paper provides a critical analysis of Mobile Learning projects published before the end of 2007. The review uses a Mobile Learning framework to evaluate and categorize 102 Mobile Learning projects, and to briefly introduce exemplary projects for each category. All projects were analysed with the criteria: context, tools, control, communication, subject and objective. Although a significant number of projects hav...

  14. User's operating procedures. Volume 2: Scout project financial analysis program

    Science.gov (United States)

    Harris, C. G.; Haris, D. K.

    1985-01-01

    A review is presented of the user's operating procedures for the Scout Project Automatic Data system, called SPADS. SPADS is the result of the past seven years of software development on a Prime mini-computer located at the Scout Project Office, NASA Langley Research Center, Hampton, Virginia. SPADS was developed as a single entry, multiple cross-reference data management and information retrieval system for the automation of Project office tasks, including engineering, financial, managerial, and clerical support. This volume, two (2) of three (3), provides the instructions to operate the Scout Project Financial Analysis program in data retrieval and file maintenance via the user friendly menu drivers.

  15. Interactive reliability analysis project. FY 80 progress report

    International Nuclear Information System (INIS)

    Rasmuson, D.M.; Shepherd, J.C.

    1981-03-01

    This report summarizes the progress to date in the interactive reliability analysis project. Purpose is to develop and demonstrate a reliability and safety technique that can be incorporated early in the design process. Details are illustrated in a simple example of a reactor safety system

  16. Project management: a case of fixed price IS/IT projects. Analysis of projects by project scopes

    Directory of Open Access Journals (Sweden)

    Miroslav Kral

    2012-10-01

    Full Text Available The paper provides an overview of major issues of IS / IT projects. Attention will be focused on projects that are implemented under a contract for a specified amount of work and fixed price. The main purpose of the paper is to analyse the project parameters in terms of the types of projects, and to confirm, or refuse, a hypothesis related to this. There is some evidence from the portfolio of projects that have been implemented by the international companies providing IT services. Regarding the localisation, CEE region was selected for our research. The outputs of the paper should be a contribution to managing IS/IT projects in IT service delivery organizations and for the support of innovative thinking about project management generally.

  17. A root cause analysis project in a medication safety course.

    Science.gov (United States)

    Schafer, Jason J

    2012-08-10

    To develop, implement, and evaluate team-based root cause analysis projects as part of a required medication safety course for second-year pharmacy students. Lectures, in-class activities, and out-of-class reading assignments were used to develop students' medication safety skills and introduce them to the culture of medication safety. Students applied these skills within teams by evaluating cases of medication errors using root cause analyses. Teams also developed error prevention strategies and formally presented their findings. Student performance was assessed using a medication errors evaluation rubric. Of the 211 students who completed the course, the majority performed well on root cause analysis assignments and rated them favorably on course evaluations. Medication error evaluation and prevention was successfully introduced in a medication safety course using team-based root cause analysis projects.

  18. East Asia basin Analysis Project

    International Nuclear Information System (INIS)

    Terman, M.J.

    1986-01-01

    The United Nations-related Committee for Coordination of Joint Prospecting for Mineral Resources in Asian Offshore Areas (CCOP), in cooperation with the International Union of Geological Sciences and Circum-Pacific Council, is implementing the East Asia Basin Analysis Project. National and regional organizations, principally members of the ASEAN Council of Petroleum, are compiling maps at a scale of 1:2 million and stratigraphic cross sections of basins, with particular initial emphasis on defining and assessing oil and gas plays and with later analytical focus on other sedimentary minerals (e.g., coal, phosphate, evaporites, and uranium). Completion is anticipated in 1988. Two major elements of the project are being contributed from other agencies. (1) Base maps. - The US Geological Survey (USGS) has partly compiled eight sheets covering east Asia that show bathymetry, shorelines, and drainage systems. One sheet also presents topography and selected cultural features. All sheets are scheduled to be completed in 1987. (2) Geotectonic maps. - The Working Group on Studies of East Asian Tectonics and Resources (SEATAR) is now completing 10 transect studies with crustal profiles and strip maps at a scale of 1:1 million. One map for each transect shows a plate tectonic interpretation. Transect coordinators or others will be encouraged to extrapolate between the strips and complete the geotectonic interpretation (on USGS bases) in 1987. The IGCP Project 220 is also compiling on (USGS bases) the tin and tungsten granites of east Asia, emphasizing geochemical data needed to identify predictive models. Other mapping will probably follow mineral-deposit modeling workshops on ophiolotic chromite and regional symposia on oceanic massive sulfide and subvolcanic gold and base metals. Completion may be possible by 1989

  19. Benefit–cost analysis of non-marginal climate and energy projects

    International Nuclear Information System (INIS)

    Dietz, Simon; Hepburn, Cameron

    2013-01-01

    Conventional benefit–cost analysis incorporates the normally reasonable assumption that the policy or project under examination is marginal. Among the assumptions this entails is that the policy or project is small, so the underlying growth rate of the economy does not change. However, this assumption may be inappropriate in some important circumstances, including in climate-change and energy policy. One example is global targets for carbon emissions, while another is a large renewable energy project in a small economy, such as a hydropower dam. This paper develops some theory on the evaluation of non-marginal projects, with empirical applications to climate change and energy. We examine the conditions under which evaluation of a non-marginal project using marginal methods may be wrong, and in our empirical examples we show that both qualitative and large quantitative errors are plausible. - Highlights: • This paper develops the theory of the evaluation of non-marginal projects. • It also includes empirical applications to climate change and energy. • We show when evaluation of a non-marginal project using marginal methods is wrong

  20. An economic analysis methodology for project evaluation and programming.

    Science.gov (United States)

    2013-08-01

    Economic analysis is a critical component of a comprehensive project or program evaluation methodology that considers all key : quantitative and qualitative impacts of highway investments. It allows highway agencies to identify, quantify, and value t...

  1. Project Portfolio Risk Identification and Analysis, Considering Project Risk Interactions and Using Bayesian Networks

    Directory of Open Access Journals (Sweden)

    Foroogh Ghasemi

    2018-05-01

    Full Text Available An organization’s strategic objectives are accomplished through portfolios. However, the materialization of portfolio risks may affect a portfolio’s sustainable success and the achievement of those objectives. Moreover, project interdependencies and cause–effect relationships between risks create complexity for portfolio risk analysis. This paper presents a model using Bayesian network (BN methodology for modeling and analyzing portfolio risks. To develop this model, first, portfolio-level risks and risks caused by project interdependencies are identified. Then, based on their cause–effect relationships all portfolio risks are organized in a BN. Conditional probability distributions for this network are specified and the Bayesian networks method is used to estimate the probability of portfolio risk. This model was applied to a portfolio of a construction company located in Iran and proved effective in analyzing portfolio risk probability. Furthermore, the model provided valuable information for selecting a portfolio’s projects and making strategic decisions.

  2. SUCCESS CONCEPT ANALYSIS APPLIED TO THE INFORMATION TECHNOLOGY PROJECT MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Cassio C. Montenegro Duarte

    2012-05-01

    Full Text Available This study evaluates the concept of success in project management that is applicable to the IT universe, from the classical theory associated with the techniques of project management. Therefore, it applies the theoretical analysis associated to the context of information technology in enterprises as well as the classic literature of traditional project management, focusing on its application in business information technology. From the literature developed in the first part of the study, four propositions were prepared for study which formed the basis for the development of the field research with three large companies that develop projects of Information Technology. The methodology used in the study predicted the development of the multiple case study. Empirical evidence suggests that the concept of success found in the classical literature in project management adjusts to the environment management of IT projects. Showed that it is possible to create the model of standard IT projects in order to replicate it in future derivatives projects, which depends on the learning acquired at the end of a long and continuous process and sponsorship of senior management, which ultimately results in its merger into the company culture.

  3. GLobal Ocean Data Analysis Project (GLODAP) version 1.1 (NODC Accession 0001644)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The GLobal Ocean Data Analysis Project (GLODAP) is a cooperative effort to coordinate global synthesis projects funded through NOAA/DOE and NSF as part of the Joint...

  4. Loss of feedwater heater analysis for the South Texas Project

    International Nuclear Information System (INIS)

    Joyce, K.C.; Johnson, M.R.; Albury, C.R.

    1987-01-01

    The results of the steady state and transient analyses of the low pressure feedwater heater train for the South Texas Nuclear Project are presented. The South Texas Project consists of two 1250 MW Westinghouse PWR units. This analysis was performed using the Modular Modeling System (MMS) simulation code. The model presented will be incorporated into the secondary side model in support of the plant training simulator and the analysis of secondary side transients. Results of this analysis are considered preliminary until benchmarked against actual plant data. A model description of the feedwater heater train from the condensate pumps to the deaerator is presented. The methodology used to develop the model is also discussed. Results of the steady state run are presented, and a transient, the loss of extraction steam to feedwater heater 15A, is examined

  5. Aeroelastic Analysis of Olsen Wings 14.3m Blade-Blatigue Project

    DEFF Research Database (Denmark)

    Galinos, Christos

    HAWC2 model description and basic analysis of a 15 m rotor radius horizontal axis wind turbine (HAWT) based on 14.3m blade from Olsen Wings and the V27 wind turbine (WT) tower and nacelle properties. The subcomponents of the aero-elastic HAWC2 model have been created in previous projects. The aim...... of this analysis is to give an overview of the whole model properties and response through simulations. The blade structural and aerodynamic properties in HAWC2 format have been provided by Frederik Zahle and the HAWC2 model of the V27 structure by Morten H. Hansen of DTU Wind Energy Department. The current...... analysis is part of the Bladigue project ( Blatigue, 2020)....

  6. Compas project stress analysis of HLW containers: behaviour under realistic disposal conditions

    International Nuclear Information System (INIS)

    Ove Arup and Partners, London

    1990-01-01

    The Compas project is concerned with the structural performance of metal overpacks which may be used to encapsulate vitrified high-level waste (HLW) forms before disposal in deep geological repositories. In this final stage of the project, analysis of an HLW overpack of realistic design is performed to predict its behaviour when subjected to likely repository loads. This analysis work is undertaken with the benefit of experience gained in previous phases of the project in which the ability to accurately predict overpack behaviour, when subjected to a uniform external pressure, was demonstrated. Burial in clay, granite and salt environments has been considered and two distinct loading arrangements identified, in an attempt to represent the worst conditions that could be imposed by such media. The analysis successfully demonstrates the ability of the containers to withstand extreme, yet credible, repository loads

  7. Space science technology: In-situ science. Sample Acquisition, Analysis, and Preservation Project summary

    Science.gov (United States)

    Aaron, Kim

    1991-01-01

    The Sample Acquisition, Analysis, and Preservation Project is summarized in outline and graphic form. The objective of the project is to develop component and system level technology to enable the unmanned collection, analysis and preservation of physical, chemical and mineralogical data from the surface of planetary bodies. Technology needs and challenges are identified and specific objectives are described.

  8. [Review and analysis of the review results of Taiwan nurses association nursing projects (2011~2013)].

    Science.gov (United States)

    Chang, Li-Yin; Chen, Yu-Chih; Huang, Kuang-Chi; Huang, Jui-Lan; Lee, Tso-Ying

    2015-04-01

    Nursing projects are a key part of N4 professional competency training for nursing personnel. Low passage rates for these projects have been shown to negatively affect the intent of nursing personnel to advance further in the nursing ladder system. This study analyzes the scores for nursing projects between 2011 and 2013, the passage rate for these projects, and the differences in passage rates between different types of projects. This retrospective and descriptive study collected data on nursing projects conducted under the auspices of the Taiwan Nurses Association between 2011 and 2013. Furthermore, the comments of reviewers on 100 nursing projects were randomly selected and subjected to content analysis. A total of 3,359 nursing projects were examined. Eliminating unqualified nursing projects left a total of 3,246 projects for the dataset. A total of 1,099 projects were scored with passing grades, giving a passing rate of 33.9%. The authors of these passing projects worked primarily in northern Taiwan, worked in medical centers, and worked in intensive care departments. The projects submitted by authors in central Taiwan had the highest average score and passing rate, while those living in offshore islands had the lowest average score and passing rate. Most of the project topics belonged to the category: "improvement of nursing service skills or quality" (77.3%). Items with the lowest scores were: validation of questions, analysis of the current situation, and evaluation of results. The topics of nursing projects did not relate significantly to passing rate. However, years of experience, geographic location of hospital, level of institution, and department each had a statistically significant impact on the passage rate. A content analysis of reviewer comments was used to extract common problems. Most of the positive comments were related to the category of "literature review and reference", while most of the negative comments were related to the categories of

  9. THEORETICAL PRINCIPLES OF PSYCHOLOGICAL ANALYSIS OF STUDENTS’ GROUP PROJECT ACTIVITY WHILE LEARNING FOREIGN LANGUAGE

    Directory of Open Access Journals (Sweden)

    Viktoriia Kalamazh

    2016-06-01

    Full Text Available In this research the theoretical principles of psychological analysis of group project activity of students in the process of learning foreign language are defined on the basis of subject-activity, socio-psychological and cognitive paradigms. The approaches of different authors to the understanding of the concept of project and in particular group project activity are considered. The difficulties of the theoretical analysis of this specific notion are indicated due to the considerable variety of subjects, types and forms of the pedagogical activity, academic disciplines regarding which the researches are being carried out. Not disclosed aspects of organizing the group project activity of students are being determined, among them is a project group as an autonomous subject of joint activity for the realization students’ project activity while learning a foreign language; forming psychological readiness of teacher and student to use project method; the role of metacognitive aspect in the surrounding, where the project activity is being carried out; group functioning through the project work as a subject of group examination. It has been indicated that the analysis of project activity as an innovative technology must include its assessment as a condition of student’s developing as a subject of learning activity, his personal, socio-psychological, intellectual and professional self-perfection. Three levels of subjectivity in group project activity are being distinguished: teacher; each particular student; and student project group. Interaction between teacher and student is based on subject-subject relations. An organization of a project activity while learning a foreign language is considered as the one in which the student is moving in order to get the manager position and to master the basis of expert knowledge. Hereby, the main stress is on the group role as a subject of group examination, and also on metacognitive character of the

  10. Analysis of registered CDM projects: potential removal of evidenced bottlenecks

    Energy Technology Data Exchange (ETDEWEB)

    Agosto, D.; Bombard, P.; Gostinelli, F.

    2007-07-01

    The Clean Development Mechanism (CDM) has developed during its first period of implementation, a distinctive set of patterns. The authors thought of concentrating on the CDM analysis in order to highlight potential remedies or reasons for given bottlenecks. In order to establish a sort of extensive SWOT analysis for CDMs, all the 356 projects actually (November 2006) registered at UNFCCC were examined, together with all the about 1000 PDDs presented to the UNFCCC but not registered yet. The CDM projects have been studied trying to cluster projects according to relevant characteristics, both from a technical and an economic point of view. Chosen indicators are meant to identify: more convenient/more diffused energy system for a CDM; reasons for a geographical distribution of different types of projects; potentials for a future exploitation of lower used technologies in CDM. Conclusions are drawn and appropriate tables and graphs presented. (1) the Baseline Emission Factor, combined to economic patterns, is the pivotal factor that characterizes both choices of host country and technology; (2) some technologies can exploit appropriately CDM scheme, whilst other technologies, are constrained by it. (3) there are still some important weak points: grouping of non Annex I countries; crediting period; criteria for the evaluation of sustainable development. (auth)

  11. Analysis of architect’s performance indicators in project delivery process

    Science.gov (United States)

    Marisa, A.

    2018-03-01

    Architect as a professional in the construction industry should possess a good performance in project delivery process. As a design professional, architect has an important role to ensure that the process is well-conducted by delivering a high-quality product for the clients. Thus, analyzing architect’s performance indicators is crucial in the project delivery process. This study aims to analyze the relative importance of architect performance indicators in project delivery process among registered architects in North Sumatera, Indonesia. A total of five indicators that measure architect performance in project delivery process were identified and 110 completed questionnaires were obtained and used for data analysis. A relative importance index is used to rank the relative importance of architect performance indicators. Results indicate that focus on the clients is the most important indicator of architect performance in project delivery process. This study demonstrates project communication as one of crucial indicators perceived by the architects for measuring their performance, and fills a knowledge gap on the importance of identifying the most important indicator for measuring architect performance from their own perspectives which previous studies have overlooked to improve performance assessment in project delivery process.

  12. A Prospective Analysis of Dynamic Loss of Breast Projection in Tissue Expander-Implant Reconstruction

    Directory of Open Access Journals (Sweden)

    Lauren M Mioton

    2015-05-01

    Full Text Available BackgroundBreast projection is a critical element of breast reconstruction aesthetics, but little has been published regarding breast projection as the firm expander is changed to a softer implant. Quantitative data representing this loss in projection may enhance patient education and improve our management of patient expectations.MethodsFemale patients who were undergoing immediate tissue-expander breast reconstruction with the senior author were enrolled in this prospective study. Three-dimensional camera software was used for all patient photographs and data analysis. Projection was calculated as the distance between the chest wall and the point of maximal projection of the breast form. Values were calculated for final tissue expander expansion and at varying intervals 3, 6, and 12 months after implant placement.ResultsFourteen breasts from 12 patients were included in the final analysis. Twelve of the 14 breasts had a loss of projection at three months following the implant placement or beyond. The percentage of projection lost in these 12 breasts ranged from 6.30% to 43.4%, with an average loss of projection of 21.05%.ConclusionsThis study is the first prospective quantitative analysis of temporal changes in breast projection after expander-implant reconstruction. By prospectively capturing projection data with three-dimensional photographic software, we reveal a loss of projection in this population by three months post-implant exchange. These findings will not only aid in managing patient expectations, but our methodology provides a foundation for future objective studies of the breast form.

  13. Analysis of the F. Calogero Type Projection-Algebraic Scheme for Differential Operator Equations

    International Nuclear Information System (INIS)

    Lustyk, Miroslaw; Bogolubov, Nikolai N. Jr.; Blackmore, Denis; Prykarpatsky, Anatoliy K.

    2010-12-01

    The existence, convergence, realizability and stability of solutions of differential operator equations obtained via a novel projection-algebraic scheme are analyzed in detail. This analysis is based upon classical discrete approximation techniques coupled with a recent generalization of the Leray-Schauder fixed point theorem. An example is included to illustrate the efficacy of the projection scheme and analysis strategy. (author)

  14. Economic impact analysis of independent power projects in British Columbia

    International Nuclear Information System (INIS)

    2009-12-01

    Independent power producer (IPP) projects have been active in British Columbia's (BC) regulated electricity market since the late 1980s. The 49 IPP projects developed in the province currently account for approximately 10 per cent of BC's electricity generation, and IPP development continues to expand in nearly every region. This study presented an economic impact analysis of IPP projects in BC. The economic impacts of IPP projects were divided into 2 categories: (1) existing IPP projects, and (2) potential IPP projects. The study showed that the total power potential supplied by BC IPP projects would increase from a current level of 5940 annual GWh to approximately 14,149 GWh. BC could also be generating a further 21,321 GWh of annual output to service demand domestically in addition to exporting to the United States. The value of capital investment in existing IPPs across BC was estimated at $2.8 billion. Capital investment in potential IPPs was estimated at $26.1 billion in 2009 constant dollars. Government revenues generated through the construction phase of potential IPP projects were estimated at $1.6 billion. IPP projects are expected to have a significant impact on First Nations groups, contribute to provincial energy self-sufficiency, and have little to no greenhouse gas (GHG) emissions. 25 refs., 19 tabs., 24 figs.

  15. Application fuzzy multi-attribute decision analysis method to prioritize project success criteria

    Science.gov (United States)

    Phong, Nguyen Thanh; Quyen, Nguyen Le Hoang Thuy To

    2017-11-01

    Project success is a foundation for project owner to manage and control not only for the current project but also for future potential projects in construction companies. However, identifying the key success criteria for evaluating a particular project in real practice is a challenging task. Normally, it depends on a lot of factors, such as the expectation of the project owner and stakeholders, triple constraints of the project (cost, time, quality), and company's mission, vision, and objectives. Traditional decision-making methods for measuring the project success are usually based on subjective opinions of panel experts, resulting in irrational and inappropriate decisions. Therefore, this paper introduces a multi-attribute decision analysis method (MADAM) for weighting project success criteria by using fuzzy Analytical Hierarchy Process approach. It is found that this method is useful when dealing with imprecise and uncertain human judgments in evaluating project success criteria. Moreover, this research also suggests that although cost, time, and quality are three project success criteria projects, the satisfaction of project owner and acceptance of project stakeholders with the completed project criteria is the most important criteria for project success evaluation in Vietnam.

  16. Data analysis and management for the Uranium Resource Evaluation Project

    International Nuclear Information System (INIS)

    Kane, V.E.

    1980-01-01

    The Department of Energy has funded a large data collection effort with the purpose of determining the US uranium resources. This Uranium Resource Evaluation (URE) Project required a large data management effort which involved collection, retrieval, processing, display, and analysis of large volumes of data. Many of the characteristics of this data processing system are relevant to other applications, particularly where routine processing involves analyses for input into numerous technical reports. The URE Project computing system has a modular program structure which has enabled a straightforward interface with both special and general graphics and analysis packages such as SAS, BMDP, and SURFACE II. Other topics include cost-effective computing, data quality, report quality computer output, and test versus production program development

  17. Sustainable Biofuel Project: Emergy Analysis of South Florida Energy Crops

    Energy Technology Data Exchange (ETDEWEB)

    Amponsah, Nana Yaw [Intelligentsia International, Inc., LaBelle, FL (United States); Izursa, Jose-Luis [Intelligentsia International, Inc., LaBelle, FL (United States); Hanlon, Edward A. [Univ. of Florida, Gainesville, FL (United States). Soil and Water Sciences Dept.; Capece, John C. [Intelligentsia International, Inc., LaBelle, FL (United States)

    2012-11-15

    This study evaluates the sustainability of various farming systems, namely (1) sugarcane on organic and mineral soils and (2) energycane and sweet sorghum on mineral soils. The primary objective of the study is to compare the relative sustainability matrices of these energy crops and their respective farming systems. These matrices should guide decision and policy makers to determine the overall sustainability of an intended or proposed bioethanol project related to any of these studied crops. Several different methods of energy analysis have been proposed to assess the feasibility or sustainability of projects exploiting natural resources (such as (Life Cycle Analysis, Energy Analysis, Exergy Analysis, Cost Benefit Analysis, Ecological Footprint, etc.). This study primarily focused on the concept of Emergy Analysis, a quantitative analytical technique for determining the values of nonmonied and monied resources, services and commodities in common units of the solar energy it took to make them. With this Emergy Analysis study, the Hendry County Sustainable Biofuels Center intends to provide useful perspective for different stakeholder groups to (1) assess and compare the sustainability levels of above named crops cultivation on mineral soils and organic soils for ethanol production and (2) identify processes within the cultivation that could be targeted for improvements. The results provide as much insight into the assumptions inherent in the investigated approaches as they do into the farming systems in this study.

  18. A Principal Component Analysis of Project Management Construction Industry Competencies for the Ghanaian

    Directory of Open Access Journals (Sweden)

    Rockson Dobgegah

    2011-03-01

    Full Text Available The study adopts a data reduction technique to examine the presence of any complex structure among a set of project management competency variables. A structured survey questionnaire was administered to 100 project managers to elicit relevant data, and this achieved a relatively high response rate of 54%. After satisfying all the necessary tests of reliability of the survey instrument, sample size adequacy and population matrix, the data was subjected to principal component analysis, resulting in the identification of six new thematic project management competency areas ; and were explained in terms of human resource management and project control; construction innovation and communication; project financial resources management; project risk and quality management; business ethics and; physical resources and procurement management. These knowledge areas now form the basis for lateral project management training requirements in the context of the Ghanaian construction industry. Key contribution of the paper is manifested in the use of the principal component analysis, which has rigorously provided understanding into the complex structure and the relationship between the various knowledge areas. The originality and value of the paper is embedded in the use of contextual-task conceptual knowledge to expound the six uncorrelated empirical utility of the project management competencies.

  19. Finite-time analysis of global projective synchronization on coloured ...

    Indian Academy of Sciences (India)

    A novel finite-time analysis is given to investigate the global projective synchronization on coloured networks. Some less conservative conditions are derived by utilizing finite-time control techniques and Lyapunov stability theorem. In addition, two illustrative numerical simulations are provided to verify the effectiveness of ...

  20. Severe accident analysis code Sampson for impact project

    International Nuclear Information System (INIS)

    Hiroshi, Ujita; Takashi, Ikeda; Masanori, Naitoh

    2001-01-01

    Four years of the IMPACT project Phase 1 (1994-1997) had been completed with financial sponsorship from the Japanese government's Ministry of Economy, Trade and Industry. At the end of the phase, demonstration simulations by combinations of up to 11 analysis modules developed for severe accident analysis in the SAMPSON Code were performed and physical models in the code were verified. The SAMPSON prototype was validated by TMI-2 and Phebus-FP test analyses. Many of empirical correlation and conventional models have been replaced by mechanistic models during Phase 2 (1998-2000). New models for Accident Management evaluation have been also developed. (author)

  1. Business valuation: an analysis of projected cash flows versus takeover bids

    Directory of Open Access Journals (Sweden)

    Camila Menezes

    2017-12-01

    Full Text Available One of the main financial statements is the Cash Flow. It became mandatory from the law # 11,638/2007 on, which changed the law # 6,404/1976 – the Corporations’ law, and the Cash Flow statement allows analysis about the companies’ operations activities effects, investing and financing, highlighting their main sources of financial allocation. In 2005 and 2006, 37 companies registered takeover bids in the Brazilian Securities Exchange Commission (CVM – Comissão de Valores Mobiliários. Based on these companies’ analysis of Projected Cash Flows (FCP – Fluxos de Caixa Projetados when the takeover bids were put in place and their Actual Cash Flows (FCR – Fluxo de Caixa Realizados the objective of this work was to compare those cash flows, to analyze the differences between the Statements of Cash Flows attached to the Appraisal Reports and the actual ones, as well as to check if these companies’ cash were in line with the balances projected in the takeover bids. The obtained results via statistical analysis of differences between the Projected Cash Flows attached to the Appraisal Reports and the effective Actual Cash Flows, all of them compared in the period between 2007 and 2013, did not show significant differences among them. IE: it was observed that, nevertheless the companies did not accomplish the promised Cash Flows delivery when the OPAs were put in place, the differences between the balances projected and the actual ones were not statistically significant.

  2. Project development and commercialisation of on-line analysis systems

    International Nuclear Information System (INIS)

    Watt, J.S.

    2000-01-01

    A project team first in the Australian Atomic Energy Commission (AAEC) and since 1982 in CSIRO has developed many on-line analysis systems for the mineral and energy industries. The development of these projects, usually lasting 7-10 years, has followed a common pattern of laboratory R and D, field trials, commercialisation and technology transfer. This successful pattern is illustrated using examples of the development of systems for the on-line analysis of mineral slurries, for determination of the ash content of coal on conveyors, and for determination of the flow rates of oil, water and gas in pipelines. The first two systems, licensed to Australian companies, are used world-wide. They are now the market leaders for radioisotope gauges in their application field. The third, the multiphase flow meter, was licensed in 1997 to an international company. This meter has even greater potential than the other two systems for economic benefit from its use and for numbers of installations. (author)

  3. The analysis of financial risk management application for NPP project in Indonesia

    International Nuclear Information System (INIS)

    Imam Bastori; Moch Djoko Birmano

    2012-01-01

    NPP Project is one of full dynamic, risky and challenging business. Application of financial risk management t in Nuclear Power Plant (NPP) project becomes one alternative to be considered carefully. This paper explains an analysis to make a decision in the risk management application so that it can be applied in the NPP's construction in Indonesia. As case study, is NPP of conventional PWR type of class 1150 MWe. To calculate the economics and financing of NPP is used Spreadsheet INOVASI, further the decision of financial risk management were analyzed using a Model of Cash Flow Adjustment, which developed by Richard Fairchild. The analysis showed that the Method of Cash Flow Adjustment developed by Richard Fairchild is better than the method of NPV Adjustment on a NPP project, because it have included the aspects of financial risk management. NPP project can only be executed if the NPV 2 0 and decision to execute the financial risk management should be based on NPVrm > NPV. The application of financial risk management in NPP project is not needed if an insurance premium more expensive than all costs of financial distress, unless the insurance company can give discount of at least 20%. (author)

  4. 75 FR 352 - Enloe Hydroelectric Project; Notice of Application Ready for Environmental Analysis and...

    Science.gov (United States)

    2010-01-05

    ... Hydroelectric Project; Notice of Application Ready for Environmental Analysis and Soliciting Comments... hydroelectric application has been filed with the Commission and is available for public inspection. a. Type of... Utility District No. 1 of Okanogan County. e. Name of Project: Enloe Hydroelectric Project. f. Location...

  5. Electric vehicle life cycle cost analysis : final research project report.

    Science.gov (United States)

    2017-02-01

    This project compared total life cycle costs of battery electric vehicles (BEV), plug-in hybrid electric vehicles (PHEV), hybrid electric vehicles (HEV), and vehicles with internal combustion engines (ICE). The analysis considered capital and operati...

  6. Measuring efficiency of lean six sigma project implementation using data envelopment analysis at Nasa

    Directory of Open Access Journals (Sweden)

    David Meza

    2013-06-01

    Full Text Available Purpose: This study aims to review the implementation of the Lean Six Sigma project methodology in the Johnson Space Center (JSC business environment of National Aeronautics and Space Administration (NASA with an objective of evaluating performance of individual projects and to develop recommendation for strategies to improve operational efficiencies based on Data Envelopment Analysis (DEA.Design/methodology/approach: In this study, authors propose the Lean Six Sigma project performance evaluation model (LSS-PPEM based on Data DEA where Critical Success Factors (CSFs and Total Team Hours serve as inputs while Process Sigma and Cost avoidance are used as outputs. The CSFs are factors that critically affect the performance of LSS at JSC. Six of those are identified by the Black Belts through Analytical Hierarchical Process, and the values of those are decided by project leaders and Green Belts through survey. Eighteen LSS projects are evaluated, and their results are analyzed.Findings and Originality/value: Eventually, four out of the six CSFs are adopted for this study based upon Pearson correlation analysis, and those four include Project execution and follow up of results; Top management’s commitment and participation; The use of data analysis with easily obtainable data; Attention given to both long and short term targets. Using data between the years 2009 and 2011, seven of the eighteen projects are found to be efficient. The benchmark analysis and slack analysis are conducted to provide further recommendation for JSC managers. Three out of those seven efficient projects are most frequently used as an efficient peer.Practical implications: Traditionally, DEA has been considered as a data-driven approach. In this study, authors incorporate the survey-based CSFs into the DEA frame. Since many organizations may have different CSFs, the framework presented in this study can be easily applied to other organizations.Originality/value: This study

  7. SNF fuel retrieval sub project safety analysis document

    International Nuclear Information System (INIS)

    BERGMANN, D.W.

    1999-01-01

    This safety analysis is for the SNF Fuel Retrieval (FRS) Sub Project. The FRS equipment will be added to K West and K East Basins to facilitate retrieval, cleaning and repackaging the spent nuclear fuel into Multi-Canister Overpack baskets. The document includes a hazard evaluation, identifies bounding accidents, documents analyses of the accidents and establishes safety class or safety significant equipment to mitigate accidents as needed

  8. SNF fuel retrieval sub project safety analysis document

    Energy Technology Data Exchange (ETDEWEB)

    BERGMANN, D.W.

    1999-02-24

    This safety analysis is for the SNF Fuel Retrieval (FRS) Sub Project. The FRS equipment will be added to K West and K East Basins to facilitate retrieval, cleaning and repackaging the spent nuclear fuel into Multi-Canister Overpack baskets. The document includes a hazard evaluation, identifies bounding accidents, documents analyses of the accidents and establishes safety class or safety significant equipment to mitigate accidents as needed.

  9. Monitoring Based Commissioning: Benchmarking Analysis of 24 UC/CSU/IOU Projects

    Energy Technology Data Exchange (ETDEWEB)

    Mills, Evan; Mathew, Paul

    2009-04-01

    Buildings rarely perform as intended, resulting in energy use that is higher than anticipated. Building commissioning has emerged as a strategy for remedying this problem in non-residential buildings. Complementing traditional hardware-based energy savings strategies, commissioning is a 'soft' process of verifying performance and design intent and correcting deficiencies. Through an evaluation of a series of field projects, this report explores the efficacy of an emerging refinement of this practice, known as monitoring-based commissioning (MBCx). MBCx can also be thought of as monitoring-enhanced building operation that incorporates three components: (1) Permanent energy information systems (EIS) and diagnostic tools at the whole-building and sub-system level; (2) Retro-commissioning based on the information from these tools and savings accounting emphasizing measurement as opposed to estimation or assumptions; and (3) On-going commissioning to ensure efficient building operations and measurement-based savings accounting. MBCx is thus a measurement-based paradigm which affords improved risk-management by identifying problems and opportunities that are missed with periodic commissioning. The analysis presented in this report is based on in-depth benchmarking of a portfolio of MBCx energy savings for 24 buildings located throughout the University of California and California State University systems. In the course of the analysis, we developed a quality-control/quality-assurance process for gathering and evaluating raw data from project sites and then selected a number of metrics to use for project benchmarking and evaluation, including appropriate normalizations for weather and climate, accounting for variations in central plant performance, and consideration of differences in building types. We performed a cost-benefit analysis of the resulting dataset, and provided comparisons to projects from a larger commissioning 'Meta-analysis' database. A

  10. Life Cycle Energy Analysis of Reclaimed Water Reuse Projects in Beijing.

    Science.gov (United States)

    Fan, Yupeng; Guo, Erhui; Zhai, Yuanzheng; Chang, Andrew C; Qiao, Qi; Kang, Peng

    2018-01-01

      To illustrate the benefits of water reuse project, the process-based life cycle analysis (LCA) could be combined with input-output LCA to evaluate the water reuse project. Energy is the only evaluation parameter used in this study. Life cycle assessment of all energy inputs (LCEA) is completed mainly by the life cycle inventory (LCI), taking into account the full life cycle including the construction, the operation, and the demolition phase of the project. Assessment of benefit from water reuse during the life cycle should focus on wastewater discharge reduction and water-saving benefits. The results of LCEA of Beijing water reuse project built in 2014 in a comprehensive way shows that the benefits obtained from the reclaimed water reuse far exceed the life cycle energy consumption. In this paper, the authors apply the LCEA model to estimate the benefits of reclaimed water reuse projects quantitatively.

  11. Bayesian-network-based safety risk analysis in construction projects

    International Nuclear Information System (INIS)

    Zhang, Limao; Wu, Xianguo; Skibniewski, Miroslaw J.; Zhong, Jingbing; Lu, Yujie

    2014-01-01

    This paper presents a systemic decision support approach for safety risk analysis under uncertainty in tunnel construction. Fuzzy Bayesian Networks (FBN) is used to investigate causal relationships between tunnel-induced damage and its influential variables based upon the risk/hazard mechanism analysis. Aiming to overcome limitations on the current probability estimation, an expert confidence indicator is proposed to ensure the reliability of the surveyed data for fuzzy probability assessment of basic risk factors. A detailed fuzzy-based inference procedure is developed, which has a capacity of implementing deductive reasoning, sensitivity analysis and abductive reasoning. The “3σ criterion” is adopted to calculate the characteristic values of a triangular fuzzy number in the probability fuzzification process, and the α-weighted valuation method is adopted for defuzzification. The construction safety analysis progress is extended to the entire life cycle of risk-prone events, including the pre-accident, during-construction continuous and post-accident control. A typical hazard concerning the tunnel leakage in the construction of Wuhan Yangtze Metro Tunnel in China is presented as a case study, in order to verify the applicability of the proposed approach. The results demonstrate the feasibility of the proposed approach and its application potential. A comparison of advantages and disadvantages between FBN and fuzzy fault tree analysis (FFTA) as risk analysis tools is also conducted. The proposed approach can be used to provide guidelines for safety analysis and management in construction projects, and thus increase the likelihood of a successful project in a complex environment. - Highlights: • A systemic Bayesian network based approach for safety risk analysis is developed. • An expert confidence indicator for probability fuzzification is proposed. • Safety risk analysis progress is extended to entire life cycle of risk-prone events. • A typical

  12. Craniofacial morphology in unoperated infants with isolated cleft palate. A cephalometric analysis in three projections

    DEFF Research Database (Denmark)

    Hermann, N.V.; Kreiborg, S.; Jensen, B.L.

    58th Annual Meeting of the American Cleft Palate-Craniofacial Association, Minneapolis, Craniofacial morphology, unoperated infants, isolated cleft palate, cephalometric analysis, three projections......58th Annual Meeting of the American Cleft Palate-Craniofacial Association, Minneapolis, Craniofacial morphology, unoperated infants, isolated cleft palate, cephalometric analysis, three projections...

  13. Hypochondriasis and somatization in college women: a personal projects analysis.

    Science.gov (United States)

    Karoly, P; Lecci, L

    1993-03-01

    Although the descriptive features of hypochondriasis and somatization have been widely studied, the motivational correlates (goal representations) of individuals manifesting abnormal illness patterns have not been considered. The Personal Projects Analysis method (Little, 1983) was used to contrast the health and nonhealth goals of female undergraduates. Subjects selected 10 goals for evaluation along a series of dimensions. When health pursuits alone were examined, hypochondriasis on the Minnesota Multiphasic Personality Inventory was found to correlate directly with goal appraisal dimensions subsumed by an anxiety-absorption factor and inversely with dimensions characterizing rewardingness, thus suggesting a negativity of health goal construal. Somatizers also pursued more health-related projects than did nonsomatizers; nonhealth goal cognition did not relate as strongly to hypochondriasis. Finally, using discriminant function analysis, goal representations were shown to significantly and substantially differentiate somatizers from nonsomatizers.

  14. Project development and commercialization of on-line analysis systems

    International Nuclear Information System (INIS)

    Watt, J.S.

    1997-01-01

    A project team first in the Australian Atomic Energy Commission (AAEC) and since 1982 in CSIRO has developed many on-line analysis systems for the mineral and energy industries. The development of these projects has followed a common pattern of laboratory R and D, field trials, commercialisation and technology transfer. This successful pattern is illustrated using examples of the development of systems for the on-line analysis of mineral slurries, for determination of the ash content of coal on conveyors, and for determination of the flow rates of oil, water and gas in pipelines. The first two systems are licensed to Australian companies, Amdel Ltd and Mineral Control Instrumentation Ltd. Both systems are used by industry worldwide, and are the market leaders for radioisotope gauges in their application field. The third system, the multiphase flow meter, was licensed in 1997 to Kvaerner FSSL Ltd of Aberdeen. This meter has even greater potential than the other two systems for economic benefit from its used and for numbers of installations. The on-line analysis systems have been developed to increase the productivity of the Australian mineral and energy industries, and to provide economic benefit to Australia. The economic benefit sought is predominantly improved process control based on use of the instrument, rather than from its sale. Sales of instruments are significant, however, with about A$80 million from the analysis systems and their derivatives since the 1970s. Some of the issues associated with the development of the on-line analysis system are outlined

  15. Medical microbiological analysis of Apollo-Soyuz test project crewmembers

    Science.gov (United States)

    Taylor, G. R.; Zaloguev, S. N.

    1976-01-01

    The procedures and results of the Microbial Exchange Experiment (AR-002) of the Apollo-Soyuz Test Project are described. Included in the discussion of procedural aspects are methods and materials, in-flight microbial specimen collection, and preliminary analysis of microbial specimens. Medically important microorganisms recovered from both Apollo and Soyuz crewmen are evaluated.

  16. Conjoint utility analysis of technical maturity and project progress of construction project

    Directory of Open Access Journals (Sweden)

    Ma Wei

    2016-01-01

    Full Text Available In this paper, taking construction project as the research object, the relationship between the project maturity index calculated by the construction project technical risks with different fine degree and the project progress index is studied, and the equilibrium relationship between the Party A’s utility curve and the Party B’s cost curve of using project maturity index and project progress index as the research variables is analyzed. The results show that, when the construction project technical risk division is more precise, the conjoint utility of the project's technical maturity index and the project progress is higher, and the project’s Party A and Party B two sides are closer to the optimal equilibrium. This shows that the construction project technical risk must be finely divided, and managed and controlled respectively, which will help to improve the conjoint utility of the project Party A and Party B two sides.

  17. Technical Analysis of Projects Being Funded by the DOE Hydrogen Program

    Energy Technology Data Exchange (ETDEWEB)

    Edward G. Skolnik

    2006-02-10

    In July 2000, Energetics began a project in which we performed site-visit based technical analyses or evaluations on hydrogen R&D projects for the purpose of providing in-depth information on the status and accomplishments of these projects to the public, and especially to hydrogen stakeholders. Over a three year period, 32 site-visit analyses were performed. In addition two concepts gleaned from the site visits became subjects of in depth techno-economic analyses. Finally, Energetics produced a compilation document that contains each site-visit analysis that we have performed, starting in 1996 on other contracts through the end of Year One of the current project (July 2001). This included 21 projects evaluated on previous contracts, and 10 additional ones from Year One. Reports on projects visited in Years One and Two were included in their respective Annual Reports. The Year Two Report also includes the two In-depth Analyses and the Compilation document. Reports in Year three began an attempt to perform reviews more geared to hydrogen safety. This Final Report contains a summary of the overall project, all of the 32 site-visit analyses and the two In-depth Analyses.

  18. The development of stochastic process modeling through risk analysis derived from scheduling of NPP project

    International Nuclear Information System (INIS)

    Lee, Kwang Ho; Roh, Myung Sub

    2013-01-01

    There are so many different factors to consider when constructing a nuclear power plant successfully from planning to decommissioning. According to PMBOK, all projects have nine domains from a holistic project management perspective. They are equally important to all projects, however, this study focuses mostly on the processes required to manage timely completion of the project and conduct risk management. The overall objective of this study is to let you know what the risk analysis derived from scheduling of NPP project is, and understand how to implement the stochastic process modeling through risk management. Building the Nuclear Power Plant is required a great deal of time and fundamental knowledge related to all engineering. That means that integrated project scheduling management with so many activities is necessary and very important. Simulation techniques for scheduling of NPP project using Open Plan program, Crystal Ball program, and Minitab program can be useful tools for designing optimal schedule planning. Thus far, Open Plan and Monte Carlo programs have been used to calculate the critical path for scheduling network analysis. And also, Minitab program has been applied to monitor the scheduling risk. This approach to stochastic modeling through risk analysis of project activities is very useful for optimizing the schedules of activities using Critical Path Method and managing the scheduling control of NPP project. This study has shown new approach to optimal scheduling of NPP project, however, this does not consider the characteristic of activities according to the NPP site conditions. Hence, this study needs more research considering those factors

  19. The development of stochastic process modeling through risk analysis derived from scheduling of NPP project

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Kwang Ho; Roh, Myung Sub [KEPCO International Nuclear Graduate School, Ulsan (Korea, Republic of)

    2013-10-15

    There are so many different factors to consider when constructing a nuclear power plant successfully from planning to decommissioning. According to PMBOK, all projects have nine domains from a holistic project management perspective. They are equally important to all projects, however, this study focuses mostly on the processes required to manage timely completion of the project and conduct risk management. The overall objective of this study is to let you know what the risk analysis derived from scheduling of NPP project is, and understand how to implement the stochastic process modeling through risk management. Building the Nuclear Power Plant is required a great deal of time and fundamental knowledge related to all engineering. That means that integrated project scheduling management with so many activities is necessary and very important. Simulation techniques for scheduling of NPP project using Open Plan program, Crystal Ball program, and Minitab program can be useful tools for designing optimal schedule planning. Thus far, Open Plan and Monte Carlo programs have been used to calculate the critical path for scheduling network analysis. And also, Minitab program has been applied to monitor the scheduling risk. This approach to stochastic modeling through risk analysis of project activities is very useful for optimizing the schedules of activities using Critical Path Method and managing the scheduling control of NPP project. This study has shown new approach to optimal scheduling of NPP project, however, this does not consider the characteristic of activities according to the NPP site conditions. Hence, this study needs more research considering those factors.

  20. Product Quality Assurance Project for Teaching of Food Analysis

    Science.gov (United States)

    Nielsen, S. S.

    2004-01-01

    Two of the challenges in teaching Food Analysis are bringing relevance to the various chemical and physical analyses discussed and exposing students to the realities of quality assurance in the food industry. In a project to help meet those objectives, each student, with the assistance of a "resource person" from the food industry, completes the…

  1. The physics analysis tools project for the ATLAS experiment

    International Nuclear Information System (INIS)

    Lenzi, Bruno

    2012-01-01

    The Large Hadron Collider is expected to start colliding proton beams in 2009. The enormous amount of data produced by the ATLAS experiment (≅1 PB per year) will be used in searches for the Higgs boson and Physics beyond the standard model. In order to meet this challenge, a suite of common Physics Analysis Tools has been developed as part of the Physics Analysis software project. These tools run within the ATLAS software framework, ATHENA, covering a wide range of applications. There are tools responsible for event selection based on analysed data and detector quality information, tools responsible for specific physics analysis operations including data quality monitoring and physics validation, and complete analysis tool-kits (frameworks) with the goal to aid the physicist to perform his analysis hiding the details of the ATHENA framework. (authors)

  2. Sparse Regression by Projection and Sparse Discriminant Analysis

    KAUST Repository

    Qi, Xin

    2015-04-03

    © 2015, © American Statistical Association, Institute of Mathematical Statistics, and Interface Foundation of North America. Recent years have seen active developments of various penalized regression methods, such as LASSO and elastic net, to analyze high-dimensional data. In these approaches, the direction and length of the regression coefficients are determined simultaneously. Due to the introduction of penalties, the length of the estimates can be far from being optimal for accurate predictions. We introduce a new framework, regression by projection, and its sparse version to analyze high-dimensional data. The unique nature of this framework is that the directions of the regression coefficients are inferred first, and the lengths and the tuning parameters are determined by a cross-validation procedure to achieve the largest prediction accuracy. We provide a theoretical result for simultaneous model selection consistency and parameter estimation consistency of our method in high dimension. This new framework is then generalized such that it can be applied to principal components analysis, partial least squares, and canonical correlation analysis. We also adapt this framework for discriminant analysis. Compared with the existing methods, where there is relatively little control of the dependency among the sparse components, our method can control the relationships among the components. We present efficient algorithms and related theory for solving the sparse regression by projection problem. Based on extensive simulations and real data analysis, we demonstrate that our method achieves good predictive performance and variable selection in the regression setting, and the ability to control relationships between the sparse components leads to more accurate classification. In supplementary materials available online, the details of the algorithms and theoretical proofs, and R codes for all simulation studies are provided.

  3. A Project Team Analysis Using Tuckman's Model of Small-Group Development.

    Science.gov (United States)

    Natvig, Deborah; Stark, Nancy L

    2016-12-01

    Concerns about equitable workloads for nursing faculty have been well documented, yet a standardized system for workload management does not exist. A project team was challenged to establish an academic workload management system when two dissimilar universities were consolidated. Tuckman's model of small-group development was used as the framework for the analysis of processes and effectiveness of a workload project team. Agendas, notes, and meeting minutes were used as the primary sources of information. Analysis revealed the challenges the team encountered. Utilization of a team charter was an effective tool in guiding the team to become a highly productive group. Lessons learned from the analysis are discussed. Guiding a diverse group into a highly productive team is complex. The use of Tuckman's model of small-group development provided a systematic mechanism to review and understand group processes and tasks. [J Nurs Educ. 2016;55(12):675-681.]. Copyright 2016, SLACK Incorporated.

  4. Towards sentiment analysis application in housing projects

    Science.gov (United States)

    Mahadzir, Nurul Husna; Omar, Mohd Faizal; Nawi, Mohd Nasrun Mohd

    2016-08-01

    In becoming a develop nation by 2020, Malaysia Government realized the need in providing affordable house to the public. Since Second Malaysia Plan, government has implemented various affordable housing projects and it continues until recent Malaysia Plan. To measure the effectiveness of the initiatives taken, public opinion is necessary. A social media platform has been seen as the most effective mechanism to get information on people's thought and feeling towards certain issues. One of the best ways to extract emotions and thoughts from what people post in social media is through Sentiment Analysis (SA). There are three different levels of analysis: document level, sentence level and feature level. Most of previous research focused on the classification of sentiment at document or sentence level. Unfortunately, both document and sentence level does not discover what exactly people like or not. While the analysis based on feature, there exist accuracy problem when classifying the sentiment scores. This paper will propose a new framework that focuses on sentiment classification scores at feature level to overcome the uncertainty and accuracy issues on the result.

  5. Statistical Analysis of the Polarimetric Cloud Analysis and Seeding Test (POLCAST) Field Projects

    Science.gov (United States)

    Ekness, Jamie Lynn

    The North Dakota farming industry brings in more than $4.1 billion annually in cash receipts. Unfortunately, agriculture sales vary significantly from year to year, which is due in large part to weather events such as hail storms and droughts. One method to mitigate drought is to use hygroscopic seeding to increase the precipitation efficiency of clouds. The North Dakota Atmospheric Research Board (NDARB) sponsored the Polarimetric Cloud Analysis and Seeding Test (POLCAST) research project to determine the effectiveness of hygroscopic seeding in North Dakota. The POLCAST field projects obtained airborne and radar observations, while conducting randomized cloud seeding. The Thunderstorm Identification Tracking and Nowcasting (TITAN) program is used to analyze radar data (33 usable cases) in determining differences in the duration of the storm, rain rate and total rain amount between seeded and non-seeded clouds. The single ratio of seeded to non-seeded cases is 1.56 (0.28 mm/0.18 mm) or 56% increase for the average hourly rainfall during the first 60 minutes after target selection. A seeding effect is indicated with the lifetime of the storms increasing by 41 % between seeded and non-seeded clouds for the first 60 minutes past seeding decision. A double ratio statistic, a comparison of radar derived rain amount of the last 40 minutes of a case (seed/non-seed), compared to the first 20 minutes (seed/non-seed), is used to account for the natural variability of the cloud system and gives a double ratio of 1.85. The Mann-Whitney test on the double ratio of seeded to non-seeded cases (33 cases) gives a significance (p-value) of 0.063. Bootstrapping analysis of the POLCAST set indicates that 50 cases would provide statistically significant results based on the Mann-Whitney test of the double ratio. All the statistical analysis conducted on the POLCAST data set show that hygroscopic seeding in North Dakota does increase precipitation. While an additional POLCAST field

  6. UMTRA project water sampling and analysis plan, Tuba City, Arizona

    International Nuclear Information System (INIS)

    1996-02-01

    Planned, routine ground water sampling activities at the U.S. Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project site in Tuba City, Arizona, are described in the following sections of this water sampling and analysis plan (WSAP). This plan identifies and justifies the sampling locations, analytical parameters, detection limits, and sampling frequency for the stations routinely monitored at the site. The ground water data are used for site characterization and risk assessment. The regulatory basis for routine ground water monitoring at UMTRA Project sites is derived from the U.S. Environmental Protection Agency (EPA) regulations in 40 CFR Part 192 (1994) and the final EPA standards of 1995 (60 FR 2854). Sampling procedures are guided by the UMTRA Project standard operating procedures (SOP) (JEG, n.d.), and the most effective technical approach for the site

  7. Project risk management: A review of an institutional project life cycle

    Directory of Open Access Journals (Sweden)

    Wanjiru Gachie

    2017-11-01

    Full Text Available This article is a desktop analysis of project risk management involving a project management institutional restructuring. The pragmatic nature of this research allows for the literature review and the document analysis to be integrated and presented as both a descriptive and analytical research. The analysis demonstrates that the project committee did not proactively manage project risk. The restructuring was a change management project, entailing the implementation of many organisational changes, such as restructuring, lay-off of some part of the administrative workforce, adoption of new technology, provision of new approaches to well-established procedures, and implementation of new performance initiative, the process which should have been managed with an effective integrated risk strategy and plan. Analysis of the restructuring project risk management exhibits little evidence of a systematic (computer based or manual record that should have provided policies, procedures, and structures for managing risk. The article concludes that the restructuring risk process was inadequate and it could not have ensured a successful project. An analysis of the restructuring project risk monitoring and control exhibits a reactive rather than proactive application of risk management procedures. The analysis further indicates that the committee failed to make use of the various project risk management processes, standards, and guidelines. Based on the conclusions, the article recommends that project risk planning, strategy, control, and monitoring should be put in place for future institutional projects. The project management team should also put in place procedures for primary stakeholders engagements, identify and address their nature of interest and power in future risk management projects

  8. Project X: competitive intelligence data mining and analysis

    Science.gov (United States)

    Gilmore, John F.; Pagels, Michael A.; Palk, Justin

    2001-03-01

    Competitive Intelligence (CI) is a systematic and ethical program for gathering and analyzing information about your competitors' activities and general business trends to further your own company's goals. CI allows companies to gather extensive information on their competitors and to analyze what the competition is doing in order to maintain or gain a competitive edge. In commercial business this potentially translates into millions of dollars in annual savings or losses. The Internet provides an overwhelming portal of information for CI analysis. The problem is how a company can automate the translation of voluminous information into valuable and actionable knowledge. This paper describes Project X, an agent-based data mining system specifically developed for extracting and analyzing competitive information from the Internet. Project X gathers CI information from a variety of sources including online newspapers, corporate websites, industry sector reporting sites, speech archiving sites, video news casts, stock news sites, weather sites, and rumor sites. It uses individual industry specific (e.g., pharmaceutical, financial, aerospace, etc.) commercial sector ontologies to form the knowledge filtering and discovery structures/content required to filter and identify valuable competitive knowledge. Project X is described in detail and an example competitive intelligence case is shown demonstrating the system's performance and utility for business intelligence.

  9. Experiential and Cooperative Learning: Using a Situation Analysis Project in Principles of Marketing

    Science.gov (United States)

    Munoz, Caroline; Huser, Ann

    2008-01-01

    In this article, the authors propose a semester-long experiential-learning project for introductory marketing students. The project requires an analysis of a product category, competition, and consumer base to support a new product proposal. The purpose is to (a) put into practice the concepts and definitions taught in an introductory marketing…

  10. An IS Project Management Course Project

    Science.gov (United States)

    Frank, Ronald L.

    2010-01-01

    Information Systems curricula should provide project management (PM) theory, current practice, and hands-on experience. The schedule usually does not allow time in Analysis and Design courses for development oriented project management instruction other than a short introduction. Similarly, networking courses usually don't put project management…

  11. Analysis and projections of physics in Chile

    International Nuclear Information System (INIS)

    Soto, Leopoldo; Zambra, Marcelo; Loewe, Marcelo; Gutierrez, Gonzalo; Molina, Mario; Barra, Felipe; Lund, Fernando; Saavedra, Carlos; Haberle, Patricio

    2008-01-01

    In the present work, an assessment of the Physics research capacity in Chile is presented. For this, the period between 2000 and June 2005 has been studied. In this period almost 200 physicists have contributed to scientific production in terms of ISI publications. Amongst these 200, ∼160 correspond to theoretical physicists and only ∼40 to experimental physicists; ∼178 are men and only ∼22 are women. A more detailed analysis shows that ∼160 physicists have at least one appearance in ISI publications per year considering the last 3 years. Ten years ago, a similar criteria (at least one appearance per year in ISI articles, considering mobile three-year periods), the number of active physicists in the Chilean community was estimated at 70. Therefore, the Chilean active physicists' community has doubled in 10 years. There exist 20 centres in which scientific research is developed: 18 university centres, a government institute and a private institute. As regards scientific productivity, both as related to disciplines or research areas, and well as in relation to research centres, it is found that, generally, scientific production, in a particular area in Physics or in a research centre, is directly related to the number of corresponding researchers; that is to say, the percentage of the national productivity in an area or research centre corresponds to its share in the total number of physicists in the country. A geographical analysis shows that 50% of the productivity corresponds to Santiago and 50% to the rest of the country. The impact of the different funds for research is assessed, also: FONDECYT, Presidential Chairs and large projects and centres of excellence. According to Physics researchers opinion, Fondo Nacional de Ciencia y TecnologIa (FONDECYT, National Fund fro Science and Technology) has become the best instrument to support researchi activities in Chile. However, the amount of projects awarded has practically not been increased, which is

  12. Analysis and projections of physics in Chile

    Science.gov (United States)

    Soto, Leopoldo; Zambra, Marcelo; Loewe, Marcelo; Gutiérrez, Gonzalo; Molina, Mario; Barra, Felipe; Lund, Fernando; Saavedra, Carlos; Haberle, Patricio

    2008-11-01

    In the present work, an assessment of the Physics research capacity in Chile is presented. For this, the period between 2000 and June 2005 has been studied. In this period almost 200 physicists have contributed to scientific production in terms of ISI publications. Amongst these 200, ~160 correspond to theoretical physicists and only ~40 to experimental physicists; ~178 are men and only ~22 are women. A more detailed analysis shows that ~160 physicists have at least one appearance in ISI publications per year considering the last 3 years. Ten years ago, a similar criteria (at least one appearance per year in ISI articles, considering mobile three-year periods), the number of active physicists in the Chilean community was estimated at 70. Therefore, the Chilean active physicists' community has doubled in 10 years. There exist 20 centres in which scientific research is developed: 18 university centres, a government institute and a private institute. As regards scientific productivity, both as related to disciplines or research areas, and well as in relation to research centres, it is found that, generally, scientific production, in a particular area in Physics or in a research centre, is directly related to the number of corresponding researchers; that is to say, the percentage of the national productivity in an area or research centre corresponds to its share in the total number of physicists in the country. A geographical analysis shows that 50% of the productivity corresponds to Santiago and 50% to the rest of the country. The impact of the different funds for research is assessed, also: FONDECYT, Presidential Chairs and large projects and centres of excellence. According to Physics researchers opinion, Fondo Nacional de Ciencia y Tecnología (FONDECYT, National Fund fro Science and Technology) has become the best instrument to support researchi activities in Chile. However, the amount of projects awarded has practically not been increased, which is insufficient

  13. Risk analysis for renewable energy projects due to constraints arising

    Science.gov (United States)

    Prostean, G.; Vasar, C.; Prostean, O.; Vartosu, A.

    2016-02-01

    Starting from the target of the European Union (EU) to use renewable energy in the area that aims a binding target of 20% renewable energy in final energy consumption by 2020, this article illustrates the identification of risks for implementation of wind energy projects in Romania, which could lead to complex technical implications, social and administrative. In specific projects analyzed in this paper were identified critical bottlenecks in the future wind power supply chain and reasonable time periods that may arise. Renewable energy technologies have to face a number of constraints that delayed scaling-up their production process, their transport process, the equipment reliability, etc. so implementing these types of projects requiring complex specialized team, the coordination of which also involve specific risks. The research team applied an analytical risk approach to identify major risks encountered within a wind farm project developed in Romania in isolated regions with different particularities, configured for different geographical areas (hill and mountain locations in Romania). Identification of major risks was based on the conceptual model set up for the entire project implementation process. Throughout this conceptual model there were identified specific constraints of such process. Integration risks were examined by an empirical study based on the method HAZOP (Hazard and Operability). The discussion describes the analysis of our results implementation context of renewable energy projects in Romania and creates a framework for assessing energy supply to any entity from renewable sources.

  14. Going South: Analysis of an Historic Project Engineering Failure

    Science.gov (United States)

    Scott, John H.

    2009-01-01

    NASA's successful conduct of the Apollo Program greatly enhanced the prestige of the United States and remains broadly accepted as America's gift to all Mankind. NASA's accomplishments continue to amaze the world. With the Vision for Space Exploration (VSE) Americans once again tasked NASA to carry out a project that is expected to provide inspiration and economic stimulus to the United States and to the world. In preparation NASA has thoroughly examined space program precedents. There is, however, another precedent which has not been examined in this context but whose scope and environment in many ways parallel the VSE. This project was initiated by a team that had, ten years before, successfully completed an effort that, at a cost of $173 billion (in 2008 dollars), had pushed the envelope of technology, brought economic growth, established their country as the world leader in engineering, and been broadly accepted as that country's gift to all Mankind. The new project was again inspired by popular desire to enhance national prestige and make yet another major contribution to Humanity. This effort was predicted to require eight years and $156 billion (2008 dollars). However, after nine years and expenditures of 96% beyond the baseline, the project collapsed amid bankruptcy, political scandal, and criminal prosecution. This paper applies current project management metrics, such as earned value analysis, to review the strategic decisions in this historic failure and describe its ultimate collapse. Key mistakes are identified, and lessons are drawn which may prove useful in guiding the VSE.

  15. Development of a site analysis tool for distributed wind projects

    Energy Technology Data Exchange (ETDEWEB)

    Shaw, Shawn [The Cadmus Group, Inc., Waltham MA (United States)

    2012-02-28

    The Cadmus Group, Inc., in collaboration with the National Renewable Energy Laboratory (NREL) and Encraft, was awarded a grant from the Department of Energy (DOE) to develop a site analysis tool for distributed wind technologies. As the principal investigator for this project, Mr. Shawn Shaw was responsible for overall project management, direction, and technical approach. The product resulting from this project is the Distributed Wind Site Analysis Tool (DSAT), a software tool for analyzing proposed sites for distributed wind technology (DWT) systems. This user-friendly tool supports the long-term growth and stability of the DWT market by providing reliable, realistic estimates of site and system energy output and feasibility. DSAT-which is accessible online and requires no purchase or download of software-is available in two account types; Standard: This free account allows the user to analyze a limited number of sites and to produce a system performance report for each; and Professional: For a small annual fee users can analyze an unlimited number of sites, produce system performance reports, and generate other customizable reports containing key information such as visual influence and wind resources. The tool’s interactive maps allow users to create site models that incorporate the obstructions and terrain types present. Users can generate site reports immediately after entering the requisite site information. Ideally, this tool also educates users regarding good site selection and effective evaluation practices.

  16. Analysis of Nordic educational projects designed to meet challenges in society

    DEFF Research Database (Denmark)

    Liveng, Anne; Manninen, Jyri; Àrnason, Hróbjartur

    , process or structure identified in the successful projects: 1.Networking: Planning, implementation and development of the programme is based on networking of various - and even unexpected - organizations and players/participants. 2.Process evaluation: Continuous project development, documentation...... and analysis of results is inte-grated in the project, using Process Evaluation or Action Research 3.Flexibility: Programme offers flexible access and participation, individualized content or individualized study methods (ICT) 4.Focus on needs: A programme focuses on authentic regional, sectorial or individual...... learning providers, trade unions and other agencies supporting human development to create learning inter-ventions to address specific crisis, challenges or changes. In view of recent crises experienced by the Nordic countries The Education and Training Service Centre in Ice-land (www.frae.is) proposed...

  17. The Timber Resource Inventory Model (TRIM): a projection model for timber supply and policy analysis.

    Science.gov (United States)

    P.L. Tedder; R.N. La Mont; J.C. Kincaid

    1987-01-01

    TRIM (Timber Resource Inventory Model) is a yield table projection system developed for timber supply projections and policy analysis. TRIM simulates timber growth, inventories, management and area changes, and removals over the projection period. Programs in the TRIM system, card-by-card descriptions of required inputs, table formats, and sample results are presented...

  18. Job task and functional analysis of the Division of Reactor Projects, office of Nuclear Reactor Regulation. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Morzinski, J.A.; Gilmore, W.; Hahn, H.A.

    1998-07-10

    A job task and functional analysis was recently completed for the positions that make up the regional Divisions of Reactor Projects. Among the conclusions of that analysis was a recommendation to clarify roles and responsibilities among site, regional, and headquarters personnel. As that analysis did not cover headquarters personnel, a similar analysis was undertaken of three headquarters positions within the Division of Reactor Projects: Licensing Assistants, Project Managers, and Project Directors. The goals of this analysis were to systematically evaluate the tasks performed by these headquarters personnel to determine job training requirements, to account for variations due to division/regional assignment or differences in several experience categories, and to determine how, and by which positions, certain functions are best performed. The results of this analysis include recommendations for training and for job design. Data to support this analysis was collected by a survey instrument and through several sets of focus group meetings with representatives from each position.

  19. Software project profitability analysis using temporal probabilistic reasoning; an empirical study with the CASSE framework

    CSIR Research Space (South Africa)

    Balikuddembe, JK

    2009-04-01

    Full Text Available Undertaking adequate risk management by understanding project requirements and ensuring that viable estimates are made on software projects require extensive application and sophisticated techniques of analysis and interpretation. Informative...

  20. Anomalies and contradictions in an airport construction project: a historical analysis based on Cultural-Historical Activity Theory.

    Science.gov (United States)

    Lopes, Manoela Gomes Reis; Vilela, Rodolfo Andrade de Gouveia; Querol, Marco Antônio Pereira

    2018-02-19

    Large construction projects involve the functioning of a complex activity system (AS) in network format. Anomalies such as accidents, delays, reworks, etc., can be explained by contradictions that emerge historically in the system. The aim of this study was to analyze the history of an airport construction project to understand the current contradictions and anomalies in the AS and how they emerged. A case study was conducted for this purpose, combining Collective Work Analysis, interviews, observations, and analysis of documents that provided the basis for sessions in the Change Laboratory, where a participant timeline was elaborated with the principal events during the construction project. Based on the timeline, a historical analysis of the airport's AS revealed critical historical events and contradictions that explained the anomalies that occurred during the project. The analysis showed that the airport had been planned for construction with politically determined deadlines that were insufficient and inconsistent with the project's complexity. The choice of the contract modality, which assigned responsibility to a joint venture for all of the project's phases, was another critical historical event, because it allowed launching the construction before a definitive executive project had been drafted. There were also different cultures in companies working together for the first time in the context of a project with time pressures and outsourcing of activities without the necessary coordination. Identifying these contradictions and their historical origins proved essential for understanding the current situation and efforts to prevent similar situations in the future.

  1. Analysis of energy consumption, indoor climate, occupant satisfaction and overall evaluation of the project

    DEFF Research Database (Denmark)

    Zanghirella, Fabio; Thomsen, Kirsten Engelund; Knudsen, Henrik Nellemose

    . Deliverable 23 Deliverable 23 is a deliverable produced as part of the final reporting of the project. It is meant to provide an overview of energy consumption analysis, indoor climate and occupants satisfaction investigations and an overall evaluation of the project. The distribution is public....

  2. Analysis of Installed Measures and Energy Savings for Single-Family Residential Better Buildings Projects

    Energy Technology Data Exchange (ETDEWEB)

    Heaney, M. [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Polly, B. [National Renewable Energy Laboratory (NREL), Golden, CO (United States)

    2015-04-30

    This report presents an analysis of data for residential single-family projects reported by 37 organizations that were awarded federal financial assistance (cooperative agreements or grants) by the U.S. Department of Energy’s Better Buildings Neighborhood Program.1 The report characterizes the energy-efficiency measures installed for single-family residential projects and analyzes energy savings and savings prediction accuracy for measures installed in a subset of those projects.

  3. Application and importance of cost-benefit analysis in energy efficiency projects implemented in public buildings: The case of Serbia

    Directory of Open Access Journals (Sweden)

    Đurovic Dejan M.

    2012-01-01

    Full Text Available The main objective of this paper is to present the advantages of using Cost-Benefit analysis in energy efficiency projects implemented in public buildings, and to prove the hypothesis that Cost-Benefit analysis boosts the effectiveness and efficiency of the said type of projects. The paper offers theoretical and practical explanation of the implementation of Cost-Benefit analysis in the relevant area. Since energy efficiency projects in public buildings usually represent a part of a broader portfolio of similar projects and their implementation demands allocation of substantial financial resources, communities are often be interested in achieving maximal economic and non-economic benefits. This paper aims to demonstrate that Cost-Benefit analysis can represent an excellent contribution when attempting to select the projects for implementation within a broader portfolio of energy efficiency projects in public buildings. This hypothesis was demonstrated by putting a greater emphasis on non-economic benefits and the costs arising from implementation of the aforementioned types of projects. In addition, a practical test of this hypothesis was performed through the implementation of an energy efficiency portfolio in public buildings, worth several tens of millions of dollars - the Serbian Energy Efficiency Project. The paper concludes that the use of Cost-Benefit analysis can help us to effectively evaluate and manage projects of this type aimed at achieving maximum benefits for the community in question.

  4. Project analysis and integration economic analyses summary

    Science.gov (United States)

    Macomber, H. L.

    1986-01-01

    An economic-analysis summary was presented for the manufacture of crystalline-silicon modules involving silicon ingot/sheet, growth, slicing, cell manufacture, and module assembly. Economic analyses provided: useful quantitative aspects for complex decision-making to the Flat-plate Solar Array (FSA) Project; yardsticks for design and performance to industry; and demonstration of how to evaluate and understand the worth of research and development both to JPL and other government agencies and programs. It was concluded that future research and development funds for photovoltaics must be provided by the Federal Government because the solar industry today does not reap enough profits from its present-day sales of photovoltaic equipment.

  5. The present status of carbon 14 analysis and projects for beryllium 10 analysis at the Tandetron 1 accelerator, Nagoya University

    Energy Technology Data Exchange (ETDEWEB)

    Nakamura, Toshio; Oda, Hirotaka; Ikeda, Akiko; Niu, Etsuko [Nagoya Univ. (Japan)

    2001-02-01

    The operation experience in 1999 of the Tandetron accelerator age estimation system, Nagoya University, is reported, after the overview and the history of the accelerator is briefly described. Total number of carbon 14 environmental samples analyzed was 8567. The project of introducing new HVEE Tandetron for C-14 analysis, and modifying the present GIC Tandetron for Be-10 analysis is presented. Ion source shall be replaced, and the heavy ion detector shall be installed. Projected geological and archaeological studies using Be-10 are enumerated. (A. Yamamoto)

  6. A directory of computer codes suitable for stress analysis of HLW containers - Compas project

    International Nuclear Information System (INIS)

    1989-01-01

    This document reports the work carried out for the Compas project which looked at the capabilities of various computer codes for the stress analysis of high-level nuclear-waste containers and overpacks. The report concentrates on codes used by the project partners, but also includes a number of the major commercial finite element codes. The report falls into two parts. The first part of the report describes the capabilities of the codes. This includes details of the solution methods used in the codes, the types of analysis which they can carry out and the interfacing with pre - and post - processing packages. This is the more comprehensive section of the report. The second part of the report looks at the performance of a selection of the codes (those used by the project partners). This look at how the codes perform in a number of test problems which require calculations typical of those encountered in the design and analysis of high-level waste containers and overpacks

  7. LOCATION ANALYSIS ON SMART HOUSE USING PROJECTIVE TRANSFORMATION

    Directory of Open Access Journals (Sweden)

    Galih Andi Pradana

    2014-08-01

    Full Text Available In this paper, a method of location analysis for smart house is proposed. The proposed method uses projective transformation to process the input from visual sensor for determining coordinate of resident and also the entire device inside the smart house. With a good calculated coordinate, each device function in the smart house can be optimized for the good of the resident. From the experiment results, the proposed method successfully maps all coordinates of any device in the smart house up to 81% accuracy.

  8. Incorporating socio-environmental considerations into project assessment models using multi-criteria analysis: A case study of Sri Lankan hydropower projects

    International Nuclear Information System (INIS)

    Morimoto, Risako

    2013-01-01

    Before commissioning any energy projects, conducting robust assessments of different options in terms of their economic and socio-environmental impacts is important for successful project implementation. Yet, there is currently a lack of tools that simultaneously assess sustainability impacts; instead, they are often investigated separately, which gives decision makers somehow disintegrated information. Thus the main objective of this study is to examine how to incorporate socio-environmental considerations into project assessment models. The multi-criteria analysis is applied to the case study of Sri Lankan hydropower projects as an illustrative example. The estimated quantitative relationship between economic, environmental and social impacts of hydropower development is presented in this study. Such estimation, using sustainability indicators of hydropower projects, enables us to understand marginal trade-offs among economic, environmental and social objectives of hydropower development. Hence, this would provide an overview of potential impacts of different scenarios that are designed to be implemented and indicate an optimum mix of hydropower generation. - Highlights: • This study provides an effective hydropower project evaluation method using the MCA. • The proposed tool shows the quantitative relationship explicitly. • Marginal trade-offs between sustainability objectives are presented

  9. Applying rigorous decision analysis methodology to optimization of a tertiary recovery project

    International Nuclear Information System (INIS)

    Wackowski, R.K.; Stevens, C.E.; Masoner, L.O.; Attanucci, V.; Larson, J.L.; Aslesen, K.S.

    1992-01-01

    This paper reports that the intent of this study was to rigorously look at all of the possible expansion, investment, operational, and CO 2 purchase/recompression scenarios (over 2500) to yield a strategy that would maximize net present value of the CO 2 project at the Rangely Weber Sand Unit. Traditional methods of project management, which involve analyzing large numbers of single case economic evaluations, was found to be too cumbersome and inaccurate for an analysis of this scope. The decision analysis methodology utilized a statistical approach which resulted in a range of economic outcomes. Advantages of the decision analysis methodology included: a more organized approach to classification of decisions and uncertainties; a clear sensitivity method to identify the key uncertainties; an application of probabilistic analysis through the decision tree; and a comprehensive display of the range of possible outcomes for communication to decision makers. This range made it possible to consider the upside and downside potential of the options and to weight these against the Unit's strategies. Savings in time and manpower required to complete the study were also realized

  10. Investment Decision Support for Engineering Projects Based on Risk Correlation Analysis

    Directory of Open Access Journals (Sweden)

    Yan Liu

    2012-01-01

    Full Text Available Investment decisions are usually made on the basis of the subjective judgments of experts subjected to the information gap during the preliminary stages of a project. As a consequence, a series of errors in risk prediction and/or decision-making will be generated leading to out of control investment and project failure. In this paper, the variable fuzzy set theory and intelligent algorithms integrated with case-based reasoning are presented. The proposed algorithm manages the numerous fuzzy concepts and variable factors of a project and also sets up the decision-making process in accordance with past cases and experiences. Furthermore, it decreases the calculation difficulty and reduces the decision-making reaction time. Three types of risk correlations combined with different characteristics of engineering projects are summarized, and each of these correlations is expounded at the project investment decision-making stage. Quantitative and qualitative change theories of variable fuzzy sets are also addressed for investment risk warning. The approach presented in this paper enables the risk analysis in a simple and intuitive manner and realizes the integration of objective and subjective risk assessments within the decision-makers' risk expectation.

  11. ANALYSIS OF THE DEVELOPMENT DIRECTIONS OF THE BANKING SECTOR THROUGH THE MANAGEMENT OF IT PROJECTS

    Directory of Open Access Journals (Sweden)

    Віктор Володимирович МОРОЗОВ

    2017-03-01

    Full Text Available In this article, the causes and consequences of IT projects’ budgets reformatting in banking organizations are investigated. Analysis and parallels in approaches of choosing IT projects to be implemented in foreign and Ukrainian financial institutions are being conducted. This significantly affects not only the results of investigation and selection of IT projects but also on the development of such organizations in general. The analysis shows that on the background of global GDP decrease, banks around the world are increasing their IT investments, but investments in IT projects are heavily redistributed towards digital transformation. Nevertheless, IT projects are a major driver of banking business development, so their number is rapidly growing every day in the fields of big data analytics, virtualization and cloud computing, mobility, scoring, target marketing, IT infrastructure etc. The authors draw conclusions about trends in implementation of IT projects and their impact on the development of the banking business sector.

  12. Project studies

    DEFF Research Database (Denmark)

    Geraldi, Joana; Söderlund, Jonas

    2018-01-01

    Project organising is a growing field of scholarly inquiry and management practice. In recent years, two important developments have influenced this field: (1) the study and practice of projects have extended their level of analysis from mainly focussing on individual projects to focussing on micro......, and of the explanations of project practices they could offer. To discuss avenues for future research on projects and project practice, this paper suggests the notion of project studies to better grasp the status of our field. We combine these two sets of ideas to analyse the status and future options for advancing...... project research: (1) levels of analysis; and (2) type of research. Analysing recent developments within project studies, we observe the emergence of what we refer to as type 3 research, which reconciles the need for theoretical development and engagement with practice. Type 3 research suggests pragmatic...

  13. Project-focused activity and knowledge tracker: a unified data analysis, collaboration, and workflow tool for medicinal chemistry project teams.

    Science.gov (United States)

    Brodney, Marian D; Brosius, Arthur D; Gregory, Tracy; Heck, Steven D; Klug-McLeod, Jacquelyn L; Poss, Christopher S

    2009-12-01

    Advances in the field of drug discovery have brought an explosion in the quantity of data available to medicinal chemists and other project team members. New strategies and systems are needed to help these scientists to efficiently gather, organize, analyze, annotate, and share data about potential new drug molecules of interest to their project teams. Herein we describe a suite of integrated services and end-user applications that facilitate these activities throughout the medicinal chemistry design cycle. The Automated Data Presentation (ADP) and Virtual Compound Profiler (VCP) processes automate the gathering, organization, and storage of real and virtual molecules, respectively, and associated data. The Project-Focused Activity and Knowledge Tracker (PFAKT) provides a unified data analysis and collaboration environment, enhancing decision-making, improving team communication, and increasing efficiency.

  14. Analysis of Economic and Social Effects of Pueblo Viejo Mining Project

    DEFF Research Database (Denmark)

    Parra, Cristian; Pacheco Cueva, Vladimir

    some key recommendations to effectively transform its effects into social capital and an improved level of human development. Current market conditions and new mining projects are providing extraordinary, positive and long term possibilities for improving the social and economic wellbeing in host......The research was conducted during the last quarter of 2010 and the first semester of 2011. It included planning the field work, conducting interviews, collecting data, reviewing secondary sources of information, carrying out analysis, internal and external session discussions and writing up...... the final report. This document contributes to the ongoing understanding of the potential impacts and effects of the Pueblo Viejo mining project on the human development and general progress of the people of Dominican Republic. We explain the most significant and potential effects of the project and provide...

  15. MODELLING OF FINANCIAL EFFECTIVENESS AND COMPARATIVE ANALYSIS OF PUBLIC-PRIVATE PARTNERSHIP PROJECTS AND PUBLIC PROCUREMENT

    Directory of Open Access Journals (Sweden)

    Kuznetsov Aleksey Alekseevich

    2017-10-01

    following methods were applied in the research: general scientific theoretical methods, such as idealization and formalization; general scientific experimental methods, such as modelling of objects under study. Results: the main result of this research is development of modelling for comparative analysis of PPP projects and traditional public procurement. This enables us to estimate the “price-quality” ratio and, based on it, analyze critical parameters of the project. Conclusions: despite the objective complexity of the analysis of effectiveness of PPP projects both individually and especially when compared with traditional forms of public procurement, there is a relatively simple way to perform such an analysis by means of modelling and comparison of cash flows of all parties of the PPP process. Proposed model makes the criteria for PPP projects effectiveness more intuitive for interpretation while preserving all key parameters. The relative simplicity of the analysis, calculation of limiting values, and interpretation of the results make the model a useful practical tool both for bodies of the public sector and potential private investors.

  16. Requirements Analysis Study for Master Pump Shutdown System Project Development Specification [SEC 1 and 2

    International Nuclear Information System (INIS)

    BEVINS, R.R.

    2000-01-01

    This document has been updated during the definitive design portion of the first phase of the W-314 Project to capture additional software requirements and is planned to be updated during the second phase of the W-314 Project to cover the second phase of the Project's scope. The objective is to provide requirement traceability by recording the analysis/basis for the functional descriptions of the master pump shutdown system. This document identifies the sources of the requirements and/or how these were derived. Each requirement is validated either by quoting the source or an analysis process involving the required functionality, performance characteristics, operations input or engineering judgment

  17. Sensitivity analysis of socio-economic values of time for public transport projects

    DEFF Research Database (Denmark)

    Andersen, Jonas Lohmann Elkjær; Landex, Alex; Nielsen, Otto Anker

    2007-01-01

    The socio-economic time benefits of two light rail projects in Copenhagen are investigated using three different sets of values of time. The first set is the one the Ministry of Transport recommends for use in socio-economic analysis in Denmark; this is used as basis for comparison with the two...... recommended by the Ministry of Transport. Differentiated in-vehicle values prove to generate an even higher increase in time benefits, but vary depending on the projects....

  18. Detailed analysis of radon flux studies at Australian uranium projects

    International Nuclear Information System (INIS)

    Mudd, Gavin M.

    2005-01-01

    The release of radon gas and radon progeny from uranium projects is a major issue during operation as well as for the design of rehabilitation works. In Australia, there have been a number of premining radon flux studies as part of the environmental investigation and potential development of recent uranium projects. There is also an increasing amount of operational data on radon fluxes and loads from various aspects of projects, such as tailings, waste rock and mills. Thus there exists much useful measured data which can be used to assess the design radon flux and load targets for rehabilitation. The main projects for which radon data exists includes Ranger, Olympic Dam, Beverley, Honeymoon, Jabiluka, Yeelirrie, Lake Way, Koongarra, Moline, Coronation Hill, Rockhole, Nabarlek, Rum Jungle, Port Pirie and Ben Lomond. To date, much of this data has not been systematically evaluated. The need to compile and assess this data is twofold. Firstly, to assess the loads released from uranium production as an input into life-cycle analyses of the nuclear fuel cycle, such as those undertaken by UNSCEAR and industry groups. Secondly, there is a need to set suitable design standards for radon flux for the rehabilitation of former and current uranium projects. This paper will present such a detailed compilation of radon fluxes and loads which can then be used as the basis for both life-cycle analyses as well as setting appropriate site-specific rehabilitation criteria for radon. The implications for former and current projects is then discussed as well as future data needs. Ultimately, there is a critical need for thorough baseline surveys prior to mining to ensure accurate assessments of changes to radon fluxes and loads. The data and analysis presented is considered applicable to all uranium projects in Australia, as well as being a useful model for considering such issues internationally

  19. [Analysis of projects of schistosomiasis sponsored by National Science Foundation of China].

    Science.gov (United States)

    Wen-di, Zhou; Liang, Shi; Xue-Dan, Ke; Jie, Wang

    2017-07-27

    To summarize the present development by analysis of projects in schistosomiasis funded by National Science Foundation of China (NSFC). Based on the ISIS database of NFSC, the projects in the studies of schistosomiasis from 2005 to 2016 were analyzed. The distributions of sponsored numbers, amounts, types, agencies, disciplines and changes in research topics by means of network profiles were described. During the study period, 198 projects were funded by NSFC totally with 76.05 million yuan in which the general and youth projects were main types. The main sponsored agencies were research institutes and medical colleges. The top three fields sponsored were medical pathogenic microbes and infection, veterinary and medical immunology. The funding on schistosomiasis researches has a downward trend, but studies are continuing in depth. In this situation, innovative and interdisciplinary researches need to be encouraged to promote the development of schistosomiasis.

  20. Managing Large Scale Project Analysis Teams through a Web Accessible Database

    Science.gov (United States)

    O'Neil, Daniel A.

    2008-01-01

    Large scale space programs analyze thousands of requirements while mitigating safety, performance, schedule, and cost risks. These efforts involve a variety of roles with interdependent use cases and goals. For example, study managers and facilitators identify ground-rules and assumptions for a collection of studies required for a program or project milestone. Task leaders derive product requirements from the ground rules and assumptions and describe activities to produce needed analytical products. Disciplined specialists produce the specified products and load results into a file management system. Organizational and project managers provide the personnel and funds to conduct the tasks. Each role has responsibilities to establish information linkages and provide status reports to management. Projects conduct design and analysis cycles to refine designs to meet the requirements and implement risk mitigation plans. At the program level, integrated design and analysis cycles studies are conducted to eliminate every 'to-be-determined' and develop plans to mitigate every risk. At the agency level, strategic studies analyze different approaches to exploration architectures and campaigns. This paper describes a web-accessible database developed by NASA to coordinate and manage tasks at three organizational levels. Other topics in this paper cover integration technologies and techniques for process modeling and enterprise architectures.

  1. Analysis of extreme values of the economic efficiency indicators of transport infrastructure projects

    Science.gov (United States)

    Korytárová, J.; Vaňková, L.

    2017-10-01

    Paper builds on previous research of the authors into the evaluation of economic efficiency of transport infrastructure projects evaluated by the economic efficiency ratio - NPV, IRR and BCR. Values of indicators and subsequent outputs of the sensitivity analysis show extremely favourable values in some cases. The authors dealt with the analysis of these indicators down to the level of the input variables and examined which inputs have a larger share of these extreme values. NCF for the calculation of above mentioned ratios is created by benefits that arise as the difference between zero and investment options of the project (savings in travel and operating costs, savings in travel time costs, reduction in accident costs and savings in exogenous costs) as well as total agency costs. Savings in travel time costs which contribute to the overall utility of projects by more than 70% appear to be the most important benefits in the long term horizon. This is the reason why this benefit emphasized. The outcome of the article has resulted how the particular basic variables contributed to the total robustness of economic efficiency of these project.

  2. After oil: Analysis of poetic projections into post-petroleum political ...

    African Journals Online (AJOL)

    The paper subjects a forty-three-line poem titled After Oil to critical analysis within the novel intellectual framework of “poetry and politics.” It focuses on the poem's projections into the political economy and environment of the Niger Delta at the inevitable exhaustion of the deposits of fossil fuel that is currently the mainstay of

  3. Operations planning and analysis handbook for NASA/MSFC phase B development projects

    Science.gov (United States)

    Batson, Robert C.

    1986-01-01

    Current operations planning and analysis practices on NASA/MSFC Phase B projects were investigated with the objectives of (1) formalizing these practices into a handbook and (2) suggesting improvements. The study focused on how Science and Engineering (S&E) Operational Personnel support Program Development (PD) Task Teams. The intimate relationship between systems engineering and operations analysis was examined. Methods identified for use by operations analysts during Phase B include functional analysis, interface analysis methods to calculate/allocate such criteria as reliability, Maintainability, and operations and support cost.

  4. Analysis on environmental impact of radiation from metallurgical project for rare metals

    International Nuclear Information System (INIS)

    Xia Zitong; Zhang Baozeng

    2012-01-01

    Rare metals are the composition of many high-property metal materials, which has a wide range of uses in the field of national defense advanced science technology. Since Ta-Nb material is associated radioactive mineral resources, and it contains high radionuclide, resulting in some radioactive indicators in process and workplace of the Ta-Nb smelting projects were significantly higher than that of the surrounding environmental radiation background. Based on the analysis of Ta-Nb smelting projects, the major sources of pollution were identified. and the possible radiation impact of the project was analyzed and evaluated, corrective measures on the process layout were also proposed, and reasonable suggestions of how to optimize the radiation protection were made. (authors)

  5. Analyzing how we do Analysis and Consume Data, Results from the SciDAC-Data Project

    Science.gov (United States)

    Ding, P.; Aliaga, L.; Mubarak, M.; Tsaris, A.; Norman, A.; Lyon, A.; Ross, R.

    2017-10-01

    One of the main goals of the Dept. of Energy funded SciDAC-Data project is to analyze the more than 410,000 high energy physics datasets that have been collected, generated and defined over the past two decades by experiments using the Fermilab storage facilities. These datasets have been used as the input to over 5.6 million recorded analysis projects, for which detailed analytics have been gathered. The analytics and meta information for these datasets and analysis projects are being combined with knowledge of their part of the HEP analysis chains for major experiments to understand how modern computing and data delivery is being used. We present the first results of this project, which examine in detail how the CDF, D0, NOvA, MINERvA and MicroBooNE experiments have organized, classified and consumed petascale datasets to produce their physics results. The results include analysis of the correlations in dataset/file overlap, data usage patterns, data popularity, dataset dependency and temporary dataset consumption. The results provide critical insight into how workflows and data delivery schemes can be combined with different caching strategies to more efficiently perform the work required to mine these large HEP data volumes and to understand the physics analysis requirements for the next generation of HEP computing facilities. In particular we present a detailed analysis of the NOvA data organization and consumption model corresponding to their first and second oscillation results (2014-2016) and the first look at the analysis of the Tevatron Run II experiments. We present statistical distributions for the characterization of these data and data driven models describing their consumption.

  6. Analysis Of Factors Causing Delays On Harun Nafsi - Hm Rifadin Street In Samarinda East Kalimantan Maintenance Project

    Directory of Open Access Journals (Sweden)

    Fadli

    2017-12-01

    Full Text Available This study aims to identify analyze and describe the factors that affect the project maintenance delay on Harun Nafsi - HM. Rifadin Street in Samarinda East Kalimantan. This research uses qualitative research method by utilizing questionnaires. The 30 participating respondents consist of 14 project implementers and 16 field implementers. The data are analyzed by descriptive statistical technique factor analysis and linear regression analysis. The results show that the factors influencing the delay of maintenance project of Harun Nafis - HM Rifadin Street include 1 time factor and workmanship factor 2 human resources and natural factors 3 geographical conditions late approval plans change and labor strikes and 4 non-optimal working levels and changes in the scope of the project during the work are still ongoing. Based on multiple linear regression analysis coefficient of determination value of 0.824 is obtained. It means that the four factors studied affect 82.4 of project delays and the rest of 27.6 is influenced by other variables out of this study. The results of this study also indicate that the dominant factor for road maintenance project delays is the fourth factor of the factors mentioned. The effort that the contractor needs to undertake is not to expand the employment contract if the project is underway or the contractor does not have the capability to complete another project.

  7. Student project of optical system analysis API-library development

    Science.gov (United States)

    Ivanova, Tatiana; Zhukova, Tatiana; Dantcaranov, Ruslan; Romanova, Maria; Zhadin, Alexander; Ivanov, Vyacheslav; Kalinkina, Olga

    2017-08-01

    In the paper API-library software developed by students of Applied and Computer Optics Department (ITMO University) for optical system design is presented. The library performs paraxial and real ray tracing, calculates 3d order (Seidel) aberration and real ray aberration of axis and non-axis beams (wave, lateral, longitudinal, coma, distortion etc.) and finally, approximate wave aberration by Zernike polynomials. Real aperture can be calculated by considering of real rays tracing failure on each surface. So far we assume optical system is centered, with spherical or 2d order aspherical surfaces. Optical glasses can be set directly by refraction index or by dispersion coefficients. The library can be used for education or research purposes in optical system design area. It provides ready to use software functions for optical system simulation and analysis that developer can simply plug into their software development for different purposes, for example for some specific synthesis tasks or investigation of new optimization modes. In the paper we present an example of using the library for development of cemented doublet synthesis software based on Slusarev's methodology. The library is used in optical system optimization recipes course for deep studying of optimization model and its application for optical system design. Development of such software is an excellent experience for students and help to understanding optical image modeling and quality analysis. This development is organized as student group joint project. We try to organize it as a group in real research and development project, so each student has his own role in the project and then use whole library functionality in his own master or bachelor thesis. Working in such group gives students useful experience and opportunity to work as research and development engineer of scientific software in the future.

  8. The Heliospheric Cataloguing, Analysis and Techniques Service (HELCATS) project

    Science.gov (United States)

    Barnes, D.; Harrison, R. A.; Davies, J. A.; Perry, C. H.; Moestl, C.; Rouillard, A.; Bothmer, V.; Rodriguez, L.; Eastwood, J. P.; Kilpua, E.; Gallagher, P.; Odstrcil, D.

    2017-12-01

    Understanding solar wind evolution is fundamental to advancing our knowledge of energy and mass transport in the solar system, whilst also being crucial to space weather and its prediction. The advent of truly wide-angle heliospheric imaging has revolutionised the study of solar wind evolution, by enabling direct and continuous observation of both transient and background components of the solar wind as they propagate from the Sun to 1 AU and beyond. The recently completed, EU-funded FP7 Heliospheric Cataloguing, Analysis and Techniques Service (HELCATS) project (1st May 2014 - 30th April 2017) combined European expertise in heliospheric imaging, built up over the last decade in particular through leadership of the Heliospheric Imager (HI) instruments aboard NASA's STEREO mission, with expertise in solar and coronal imaging as well as the interpretation of in-situ and radio diagnostic measurements of solar wind phenomena. HELCATS involved: (1) the cataloguing of transient (coronal mass ejections) and background (stream/corotating interaction regions) solar wind structures observed by the STEREO/HI instruments, including estimates of their kinematic properties based on a variety of modelling techniques; (2) the verification of these kinematic properties through comparison with solar source observations and in-situ measurements at multiple points throughout the heliosphere; (3) the assessment of the potential for initialising numerical models based on the derived kinematic properties of transient and background solar wind components; and (4) the assessment of the complementarity of radio observations (Type II radio bursts and interplanetary scintillation) in the detection and analysis of heliospheric structure in combination with heliospheric imaging observations. In this presentation, we provide an overview of the HELCATS project emphasising, in particular, the principal achievements and legacy of this unprecedented project.

  9. On-Line Investment Analysis and Portfolio Management: Using Learning Outcome Statements To Design Projects.

    Science.gov (United States)

    Pettijohn, James B.; Ragan, Gay A.; Ragan, Kent P.

    2003-01-01

    Describes an Internet-based project to familiarize students with online investment analysis and stock portfolio management. Outlines a process for writing learning outcomes that address three levels of cognition: knowledge/comprehension, application/analysis, and synthesis/evaluation. (SK)

  10. Economic analysis of geothermal projects

    International Nuclear Information System (INIS)

    Allegrini, G.; Cappetti, G.

    1990-01-01

    This paper reports on the high investment costs typical of geothermal energy which necessitate careful verification of the resource before embarking on a development project. Moreover, they require the adoption of all strategies aimed at limiting investment costs and times as much as possible in order to contain the tie-up of capital in the construction activities. For this purpose a series of choices has been made regarding the constructional standardization of plants and the adoption of organizational criteria that allow cost reduction and better management of the various phases of a development project. A computer program has also been developed which makes it possible to examine the bearing the various parameters relating to the reservoir characteristics have on the cost of the kWh and to optimize resource utilization for the various activities of a development project

  11. Emergy analysis of a farm biogas project in China: A biophysical perspective of agricultural ecological engineering

    Science.gov (United States)

    Zhou, S. Y.; Zhang, B.; Cai, Z. F.

    2010-05-01

    This paper aims to present a biophysical understanding of the agricultural ecological engineering by emergy analysis for a farm biogas project in China as a representative case. Accounting for the resource inputs into and accumulation within the project, as well as the outputs to the social system, emergy analysis provides an empirical study in the biophysical dimension of the agricultural ecological engineering. Economic benefits and ecological economic benefits of the farm biogas project indicated by market value and emergy monetary value are discussed, respectively. Relative emergy-based indices such as renewability (R%), emergy yield ratio (EYR), environmental load ratio (ELR) and environmental sustainability index (ESI) are calculated to evaluate the environmental load and local sustainability of the concerned biogas project. The results show that the farm biogas project has more reliance on the local renewable resources input, less environmental pressure and higher sustainability compared with other typical agricultural systems. In addition, holistic evaluation and its policy implications for better operation and management of the biogas project are presented.

  12. Financial analysis of wind power projects

    International Nuclear Information System (INIS)

    Juanico, Luis E.; Bergallo, Juan E.

    1999-01-01

    In this work a financial assessment of the economic competitiveness of wind power projects in Argentina compared with other no CO 2 emission sources, such as nuclear, was developed. Argentina has a market driven electrical grid system, and no greenhouse gas emissions penalty taxes, together with a very low natural gas cost and a sustained nuclear development program. For the financial analysis an average wind velocity source of 8 m/s, on several wind farms (from 2 machines to 60) built with new technology wind generators (750 kilowatts power, 900 dollar/kilowatt cost) operating over 20 years, was considered. The leveled cost obtained is decreasing while the number of machines is increasing, from 0,130 dollar/kilowatt-hour to 0,090 dollar/kilowatts-hour. This poor performance can be partially explained considering the higher interest rates in the argentine financial market (15%) than the ones in developed countries

  13. UMTRA Project water sampling and analysis plan, Durango, Colorado. Revision 1

    International Nuclear Information System (INIS)

    1995-09-01

    Planned, routine ground water sampling activities at the US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project site in Durango, Colorado, are described in this water sampling and analysis plan. The plan identifies and justifies the sampling locations, analytical parameters, detection limits, and sampling frequency for the routine monitoring stations at the site. The ground water data are used to characterize the site ground water compliance strategies and to monitor contaminants of potential concern identified in the baseline risk assessment (DOE, 1995a). Regulatory basis for routine ground water monitoring at UMTRA Project sites is derived from the US EPA regulations in 40 CFR Part 192 (1994) and EPA standards of 1995 (60 FR 2854). Sampling procedures are guided by the UMTRA Project standard operating procedures (SOP) (JEG, n.d.), the Technical Approach Document (TAD) (DOE, 1989), and the most effective technical approach for the site

  14. A MCDM Analysis of the Roşia Montană Gold Mining Project

    Directory of Open Access Journals (Sweden)

    Adriana Mihai

    2015-06-01

    Full Text Available The need and estimated utility for a structured analysis of the Roşia Montană gold exploitation project have been palpable in the Romanian public sphere during the last 15 years and there is a vast amount of conflicting information and opinions on the benefits and risks involved. This article provides a comprehensive decision analysis of the Roşia Montană project. Over 100 documents from the past years have been gathered regarding the Roşia Montană mining project, which cover the main official, formal and less formal documents covering the case and produced by a wide range of stakeholders. These were then analyzed while designing a multi-criteria tree including the relevant perspectives under which the most commonly discussed four alternatives were analyzed. The result of this can be translated into a valuable recommendation for the mining company and for the political decision-makers. If these stakeholders want the continuation of the project and its acceptance by civil society, the key challenge is to increase the transparency of the process and improve the credibility and legal aspects; if these aspects cannot be met, the decision-makers need to pay attention to the alternatives available for a sustainable development in the area.

  15. C.2 analysis of the environmental effects of the Nuclear Facilities Modernization project

    International Nuclear Information System (INIS)

    1991-04-01

    This analysis indicates that the potential impacts associated with the current/projected Mound tritium operations are adequately bounded by the existing environmental impacts analyzed in the FEIS. It also indicates that the incremental impacts of the NFM project will make a positive contribution to the overall impact of current/projected tritium operations. Except for minor and normal temporary conditions during the construction and demolition phases, the NFM project would measurably reduce the likelihood of adverse consequences to the environment. Relocation of the PE/PD laboratory operations from the SW/R Tritium Complex to the T Building will place these operations in a safer, state-of-the-art glovebox systems. Through the utilization of modern laboratory equipment and enhanced containment, the project will reduce the quantity of routine airborne tritium releases and volume of solid tritiated wastes resulting from routine PE/PD laboratory operations. The increased reliance placed on engineered safety aspects and stronger mitigative measures by the project will also reduce the risk associated with these operations by reducing both the probability and consequences of unusual occurrences involving uncontrolled tritium releases

  16. Which territorial integration of participative renewable energies? Present status and analysis of French projects. Final report

    International Nuclear Information System (INIS)

    Devisse, Jean-Stephane; Gilbert, Olivier; Reix, Fabien; GASPARD, Albane

    2016-02-01

    This study aimed at qualifying actors involved in projects (stakeholders, motivations, who decides what and how), at identifying the available resources (technical and financial abilities, project management abilities), at describing the mobilisation work and territorial dialogue processes, and at exploring how benefit distribution contributes to territorial dynamics. This study first identified participative renewable energy projects in France. A survey by questionnaire was then performed among project holders. Six projects have also been more deeply studied (a mix of solar and photovoltaic and wind energy, two wind farms located in two different regions, a solar photovoltaic project, a hydroelectric project, and a project on biomass from forest). After the methodology, the report defines what a participative renewable energy project is, proposes an overview of these projects in 2015, present the case studies, and proposes an analysis on the different aspects of the project process

  17. An analysis of the inter-project knowledge transfer in the petrochemical industry

    Directory of Open Access Journals (Sweden)

    Marcelo Müller Beuren

    2015-02-01

    Full Text Available This paper presents a knowledge transfer (KT analysis in an operational project management environment of the petrochemical industry. The main objective of this paper is to identify the major barriers and to suggest improvements activities aiming to foster the KT process. To this end, interviews with members of the project department were conducted by means of a questionnaire. Results were analyzed to identify the most problematic barriers and to propose improvements. The study concluded that the greatest difficulties are related to the transfer of tacit knowledge between different teams. The main contribution of this paper is that it presents an analysis of an unexplored environment and it proposes an improvement of the adapted method for KT study, by using a relationship matrix between the questionnaire and the barriers, so that problems can be identified in an easier manner.

  18. Prioritising Project Scope Definition Elements in Public Building Projects

    Directory of Open Access Journals (Sweden)

    Mohammed K Fageha

    2014-09-01

    Full Text Available A complete definition of the scope of a project upfront during early stages ensures smooth and successful implementation during the project execution. This research identifies and prioritises project scope definition elements for public buildings in Saudi Arabia. Elements that could significantly contribute to complete project scope definition package at pre-project planning stage are identified and their interrelationship determined and prioritised. Using the Project Definition Rating Index (PDRI as a basis, the study uses analytical network process (ANP technique based on data obtained from project managers who have been involved in public sector projects in Saudi Arabia. Data collection and analysis was conducted in three steps. The first step involved identification of scope definition elements while the second involved an investigation into interrelationships among the elements. In the third step, ANP was used to determine the weight of the elements’ importance in terms of contribution to project scope definition completeness. Finally, Pareto analysis was used to prioritise and assess the distribution pattern of the elements. The outcome from this research is the prioritisation of project scope definition elements for public building projects in Saudi Arabia. The prioritised list developed indicates the importance of project scope definition elements. It should help project management teams identify elements to consider when evaluating project scope definition for completeness at the pre-project planning stage. Keywords: Project scope definition, pre-project planning, prioritising, public building projects, Saudi Arabia, Analytical Network Process (ANP

  19. The sensitivity analysis of population projections

    NARCIS (Netherlands)

    Caswell, H.; Sánchez Gassen, N.

    2015-01-01

    Background Population projections using the cohort component method can be written as time-varying matrix population models. The matrices are parameterized by schedules of mortality, fertility, immigration, and emigration over the duration of the projection. A variety of dependent variables are

  20. Project Management

    DEFF Research Database (Denmark)

    Pilkington, Alan; Chai, Kah-Hin; Le, Yang

    2015-01-01

    This paper identifies the true coverage of PM theory through a bibliometric analysis of the International Journal of Project Management from 1996-2012. We identify six persistent research themes: project time management, project risk management, programme management, large-scale project management......, project success/failure and practitioner development. These differ from those presented in review and editorial articles in the literature. In addition, topics missing from the PM BOK: knowledge management project-based organization and project portfolio management have become more popular topics...

  1. Analysis of Cost of Rework on Time and Cost Performance of Building Construction Projects in Abuja, Nigeria

    Directory of Open Access Journals (Sweden)

    Emmanuel Chidiebere Eze

    2018-01-01

    Full Text Available Rework is a menace that leads to undesired and unnecessary loss of efforts, it degrades project cost and schedule performance of construction projects, both at design and construction phases. This study therefore, analyzed the impact of cost of rework on time and cost performance of building construction projects in Nigerian, using selected commercial building project within the country’s capital. A pro forma was adopted for gathering data on rework cost, project cost and time of selected building projects, while structured questionnaire was used to collect information on the likely measures for reducing rework incidences from construction professionals that were involved in the delivery of the identified projects. Regression analysis, relative importance index and Kruskal-Walis test were employed for data analysis. The study revealed a significant relationship between the cost of rework and initial and final project cost of delivering commercial buildings, as an average of 3.53% impact on the initial project cost, 46.60% contribution to cost overrun, and p-value of 0.000 was observed on all assessed projects. For the project delivery time, a significant relationship between the cost of rework and initial and final project duration, as an average of 7.35% impact on the initial delivery time, extra 19 days and p-value of 0.000 was observed on all assessed projects. Team building and education, management commitment, employee involvement, were some of the best possible measures to minimized rework problems.

  2. Benefits Analysis of Smart Grid Projects. White paper, 2014-2016

    Energy Technology Data Exchange (ETDEWEB)

    Marnay, Chris [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Liu, Liping [China Southern Grid (China); Yu, JianCheng [State Grid of China (China); Zhang, Dong [State Grid of China (China); Mauzy, Josh [Southern California Edison, CA (United States); Shaffer, Brendan [Univ. of California, Irvine, CA (United States); Dong, XuZhu [China Southern Grid (China); Agate, Will [Philadelphia Industrial Development Corp., Philadelphia, PA (United States); Vitiello, Silvia [European Commission, Ispra (Italy). Joint Research Centre; Karali, Nihan [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Liu, Angela Xu [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); He, Gang [Stony Brook Univ., NY (United States); Zhao, Li [Univ. of California, Irvine, CA (United States); Zhu, Aimee Limingming [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2016-11-01

    Smart grids are rolling out internationally, with the United States (U.S.) nearing completion of a significant USD4-plus-billion federal program funded under the American Recovery and Reinvestment Act (ARRA-2009). The emergence of smart grids is widespread across developed countries. Multiple approaches to analyzing the benefits of smart grids have emerged. The goals of this white paper are to review these approaches and analyze examples of each to highlight their differences, advantages, and disadvantages. This work was conducted under the auspices of a joint U.S.-China research effort, the Climate Change Working Group (CCWG) Implementation Plan, Smart Grid. We present comparative benefits assessments (BAs) of smart grid demonstrations in the U.S. and China along with a BA of a pilot project in Europe. In the U.S., we assess projects at two sites: (1) the University of California, Irvine campus (UCI), which consists of two distinct demonstrations: Southern California Edison’s (SCE) Irvine Smart Grid Demonstration Project (ISGD) and the UCI campus itself; and (2) the Navy Yard (TNY) area in Philadelphia, which has been repurposed as a mixed commercial-industrial, and possibly residential, development. In China, we cover several smart-grid aspects of the Sino-Singapore Tianjin Eco-city (TEC) and the Shenzhen Bay Technology and Ecology City (B-TEC). In Europe, we look at a BA of a pilot smart grid project in the Malagrotta area west of Rome, Italy, contributed by the Joint Research Centre (JRC) of the European Commission. The Irvine sub-project BAs use the U.S. Department of Energy (U.S. DOE) Smart Grid Computational Tool (SGCT), which is built on methods developed by the Electric Power Research Institute (EPRI). The TEC sub-project BAs apply Smart Grid Multi-Criteria Analysis (SG-MCA) developed by the State Grid Corporation of China (SGCC) based on the analytic hierarchy process (AHP) with fuzzy logic. The B-TEC and TNY sub-project BAs are evaluated using new

  3. UMTRA project water sampling and analysis plan, Maybell, Colorado

    International Nuclear Information System (INIS)

    1994-06-01

    This water sampling and analysis plan (WSAP) describes planned water sampling activities and provides the regulatory and technical basis for ground water sampling in 1994 at the US Department of Energy's (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project site in Maybell, Colorado. The WSAP identifies and justifies sampling locations, analytical parameters, and sampling frequencies at the site. The ground water data will be used for site characterization and risk assessment. The regulatory basis for the ground water and surface water monitoring activities is derived from the EPA regulations in 40 CFR Part 192 (1993) and the proposed EPA standards of 1987 (52 FR 36000). Sampling procedures are guided by the UMTRA Project standard operating procedures (SOP) (JEG, n.d.), the Technical Approach Document (TAD) (DOE, 1989), and the most effective technical approach for the site. This WSAP also includes a summary and the results of water sampling activities from 1989 through 1992 (no sampling was performed in 1993)

  4. Analysis of projected water availability with current basin management plan, Pajaro Valley, California

    Science.gov (United States)

    Hanson, Randall T.; Lockwood, Brian; Schmid, Wolfgang

    2014-01-01

    The projection and analysis of the Pajaro Valley Hydrologic Model (PVHM) 34 years into the future using MODFLOW with the Farm Process (MF-FMP) facilitates assessment of potential future water availability. The projection is facilitated by the integrated hydrologic model, MF-FMP that fully couples the simulation of the use and movement of water from precipitation, streamflow, runoff, groundwater flow, and consumption by natural and agricultural vegetation throughout the hydrologic system at all times. MF-FMP allows for more complete analysis of conjunctive-use water-resource systems than previously possible with MODFLOW by combining relevant aspects of the landscape with the groundwater and surface-water components. This analysis is accomplished using distributed cell-by-cell supply-constrained and demand-driven components across the landscape within “water-balance subregions” (WBS) comprised of one or more model cells that can represent a single farm, a group of farms, watersheds, or other hydrologic or geopolitical entities. Analysis of conjunctive use would be difficult without embedding the fully coupled supply-and-demand into a fully coupled simulation, and are difficult to estimate a priori.

  5. Social network analysis of a project-based introductory physics course

    Science.gov (United States)

    Oakley, Christopher

    2016-03-01

    Research suggests that students benefit from peer interaction and active engagement in the classroom. The quality, nature, effect of these interactions is currently being explored by Physics Education Researchers. Spelman College offers an introductory physics sequence that addresses content and research skills by engaging students in open-ended research projects, a form of Project-Based Learning. Students have been surveyed at regular intervals during the second semester of trigonometry-based course to determine the frequency of interactions in and out of class. These interactions can be with current or past students, tutors, and instructors. This line of inquiry focuses on metrics of Social Network analysis, such as centrality of participants as well as segmentation of groups. Further research will refine and highlight deeper questions regarding student performance in this pedagogy and course sequence.

  6. An investigation of multiple time graphical analysis applied to projection data : Theory and validation

    NARCIS (Netherlands)

    Maguire, RP; Calonder, C; Leenders, KL

    1997-01-01

    Purpose: The determination of tissue time-activity course and pharmokinetics in PET is normally performed by region-of-interest analysis of reconstructed images. However, in some cases, the same analysis may equally well be performed on the data in projections before reconstruction, avoiding the

  7. Low-Level Waste Vitrification Plant Project contracting strategy decision analysis report

    International Nuclear Information System (INIS)

    Felise, P.; Phillips, J.D.

    1994-01-01

    Ten basic contracting strategies were developed after a review of past strategies that had been used at the Hanford Site, other US Department of Energy (DOE) sites, other US government agencies, and in the private sector. As applicable to the Low-Level Waste Vitrification Plant (LLWVP) Project, each strategy was described and depicted in a schedule format to assess compatibility with the Hanford Federal Facility Agreement and Consent Order, al so known as the Tri-Party Agreement (Ecology et al. 1994) milestones, key decision points, and other project requirements. The-pro and con aspects of each strategy also were tabulated. Using this information as a basis, the LLWVP Project team members, along with representatives of Tank Waste Remediation System (TWRS) Engineering, TWRS Programs, and Procurement Materials Management, formed a Westinghouse Hanford Company (WHC) evaluation team to select the best strategy. Kepner-Tregoe decision analysis techniques were used in facilitated meetings to arrive at the best balanced choice

  8. Low-Level Waste Vitrification Plant Project contracting strategy decision analysis report

    Energy Technology Data Exchange (ETDEWEB)

    Felise, P.; Phillips, J.D.

    1994-10-17

    Ten basic contracting strategies were developed after a review of past strategies that had been used at the Hanford Site, other US Department of Energy (DOE) sites, other US government agencies, and in the private sector. As applicable to the Low-Level Waste Vitrification Plant (LLWVP) Project, each strategy was described and depicted in a schedule format to assess compatibility with the Hanford Federal Facility Agreement and Consent Order, al so known as the Tri-Party Agreement (Ecology et al. 1994) milestones, key decision points, and other project requirements. The-pro and con aspects of each strategy also were tabulated. Using this information as a basis, the LLWVP Project team members, along with representatives of Tank Waste Remediation System (TWRS) Engineering, TWRS Programs, and Procurement Materials Management, formed a Westinghouse Hanford Company (WHC) evaluation team to select the best strategy. Kepner-Tregoe decision analysis techniques were used in facilitated meetings to arrive at the best balanced choice.

  9. The EVEREST project: sensitivity analysis of geological disposal systems

    International Nuclear Information System (INIS)

    Marivoet, Jan; Wemaere, Isabelle; Escalier des Orres, Pierre; Baudoin, Patrick; Certes, Catherine; Levassor, Andre; Prij, Jan; Martens, Karl-Heinz; Roehlig, Klaus

    1997-01-01

    The main objective of the EVEREST project is the evaluation of the sensitivity of the radiological consequences associated with the geological disposal of radioactive waste to the different elements in the performance assessment. Three types of geological host formations are considered: clay, granite and salt. The sensitivity studies that have been carried out can be partitioned into three categories according to the type of uncertainty taken into account: uncertainty in the model parameters, uncertainty in the conceptual models and uncertainty in the considered scenarios. Deterministic as well as stochastic calculational approaches have been applied for the sensitivity analyses. For the analysis of the sensitivity to parameter values, the reference technique, which has been applied in many evaluations, is stochastic and consists of a Monte Carlo simulation followed by a linear regression. For the analysis of conceptual model uncertainty, deterministic and stochastic approaches have been used. For the analysis of uncertainty in the considered scenarios, mainly deterministic approaches have been applied

  10. Analysis of central enterprise architecture elements in models of six eHealth projects.

    Science.gov (United States)

    Virkanen, Hannu; Mykkänen, Juha

    2014-01-01

    Large-scale initiatives for eHealth services have been established in many countries on regional or national level. The use of Enterprise Architecture has been suggested as a methodology to govern and support the initiation, specification and implementation of large-scale initiatives including the governance of business changes as well as information technology. This study reports an analysis of six health IT projects in relation to Enterprise Architecture elements, focusing on central EA elements and viewpoints in different projects.

  11. Projecting meat and cereals demand for China based on a meta-analysis of income elasticities

    OpenAIRE

    Zhou, De; Yu, Xiaohua; Abler, David; Chen, Danhong

    2014-01-01

    There are many projections for China’s food demand, and the projection results differ significantly from each other. Different values for income elasticities could be a major reason. This study projects meat and cereals demand for China based on a meta-analysis of the income elasticity estimates using a collection of 143 and 240 income elasticity estimates for cereals and meat products, respectively, from 36 primary studies. We find that income elasticities for most cereals (general cereals, ...

  12. Decision Process Analysis on Project Priority Strategy: A Case Study of an ICT Design Firm

    Directory of Open Access Journals (Sweden)

    Vincent F. Yu

    2014-01-01

    Full Text Available Project priority strategy is the benchmarking of a corporate operation management strategy and in particular is used by a projects-based research and development firm in the complex competence environment of the information and communication technology (ICT industry. This research takes the variables of external environments and internal resources into account for a firm’s market, technology, and finance assets in order to present a decision process on a project priority strategy. This empirical study also addresses the key factors of the interaction between business on a project development’s supply chain: clients, the examined firm, and suppliers. The findings indicate that a profit-driven project can dominate the firm’s strategic operations and management from the resource-based view and analytic hierarchy process technique perspectives. At the same time, the analysis results contribute significant values to project decision management, which is highly recommended for small-medium enterprises conducting product/project development, project portfolio management, and strategic business management.

  13. Hydrodynamic Modeling Analysis to Support Nearshore Restoration Projects in a Changing Climate

    Directory of Open Access Journals (Sweden)

    Zhaoqing Yang

    2014-01-01

    Full Text Available To re-establish the intertidal wetlands with full tidal exchange and improve salmonid rearing habitat in the Skagit River estuary, State of Washington, USA, a diked agriculture farm land along the Skagit Bay front is proposed to be restored to a fully functional tidal wetland. The complex and dynamic Skagit River estuarine system calls for the need of a multi-facet and multi-dimensional analysis using observed data, numerical and analytical methods. To assist the feasibility study of the restoration project, a hydrodynamic modeling analysis was conducted using a high-resolution unstructured-grid coastal ocean model to evaluate the hydrodynamic response to restoration alternatives and to provide guidance to the engineering design of a new levee in the restoration site. A set of parameters were defined to quantify the hydrodynamic response of the nearshore restoration project, such as inundation area, duration of inundation, water depth and salinity of the inundated area. To assist the design of the new levee in the restoration site, the maximum water level near the project site was estimated with consideration of extreme high tide, wind-induced storm surge, significant wave height and future sea-level rise based on numerical model results and coastal engineering calculation.

  14. Systems approach to project risk management

    Energy Technology Data Exchange (ETDEWEB)

    Kindinger, J. P. (John P.)

    2002-01-01

    This paper describes the need for better performance in the planning and execution of projects and examines the capabilities of two different project risk analysis methods for improving project performance. A quantitative approach based on concepts and tools adopted from the disciplines of systems analysis, probabilistic risk analysis, and other fields is advocated for managing risk in large and complex research & development projects. This paper also provides an overview of how this system analysis approach for project risk management is being used at Los Alamos National Laboratory along with examples of quantitative risk analysis results and their application to improve project performance.

  15. An integrated framework for cost- benefit analysis in road safety projects using AHP method

    Directory of Open Access Journals (Sweden)

    Mahsa Mohamadian

    2011-10-01

    Full Text Available Cost benefit analysis (CBA is a useful tool for investment decision-making from economic point of view. When the decision involves conflicting goals, the multi-attribute analysis approach is more capable; because there are some social and environmental criteria that cannot be valued or monetized by cost benefit analysis. The complex nature of decision-making in road safety normally makes it difficult to reach a single alternative solution that can satisfy all decision-making problems. Generally, the application of multi-attribute analysis in road sector is promising; however, the applications are in preliminary stage. Some multi-attribute analysis techniques, such as analytic hierarchy process (AHP have been widely used in practice. This paper presents an integrated framework with CBA and AHP methods to select proper alternative in road safety projects. The proposed model of this paper is implemented for a case study of improving a road to reduce the accidents in Iran. The framework is used as an aid to cost benefit tool in road safety projects.

  16. Overlapping Boundaries of the Project Time Management and Project Risk Management

    Directory of Open Access Journals (Sweden)

    Marius PODEAN

    2010-01-01

    Full Text Available Based on utility function, milestones during project and/or the end of projects or programme may be categorized in what are called soft-deadline and hard-deadline. In contrast with the soft-end projects, the hard-end projects posses a decrease of utility function with a vertical asymptote character around the deadline for project completion. In extreme situations, the utility function itself may fall under zero (projects may generate losses to both constructor and customer. Existing risk analysis methodologies observe risks from monetary terms. The typical risks are correlated with an increase in final project costs. In order to estimate harddeadline milestones and/or end of projects or programme is critical to employ the time dimension rather than the typical cost-based risk analysis. Here, we comprehensively describe a structured methodology that focuses on minimizing and mitigating project specific delay risks. The method may supplement existing cost-based risk analysis in projects. We aim to elegantly combine moderation techniques to reveal the intrinsic risk of the projects. In addition to the technical risks, the moderation techniques are able to bring evidence of risks as the team efficacy, diverse un-correlations or miss-understanding about the roles of the team members in the team – most of the project soft risk. Described methodology encourages the common understanding of risks for participants, crystallizing the essence of what can go wrong in complex situations and where the opportunities can be unlocked.

  17. Small Explorer project: Submillimeter Wave Astronomy Satellite (SWAS). Mission operations and data analysis plan

    Science.gov (United States)

    Melnick, Gary J.

    1990-01-01

    The Mission Operations and Data Analysis Plan is presented for the Submillimeter Wave Astronomy Satellite (SWAS) Project. It defines organizational responsibilities, discusses target selection and navigation, specifies instrument command and data requirements, defines data reduction and analysis hardware and software requirements, and discusses mission operations center staffing requirements.

  18. UMTRA Project water sampling and analysis plan, Canonsburg, Pennsylvania. Revision 1

    International Nuclear Information System (INIS)

    1995-09-01

    Surface remedial action was completed at the US Department of Energy (DOE) Canonsburg and Burrell Uranium Mill Tailings Remedial Action (UMTRA) Project sites in southwestern Pennsylvania in 1985 and 1987, respectively. The Burrell disposal site, included in the UMTRA Project as a vicinity property, was remediated in conjunction with the remedial action at Canonsburg. On 27 May 1994, the Nuclear Regulatory Commission (NRC) accepted the DOE final Long-Term Surveillance Plan (LTSP) (DOE, 1993) for Burrell thus establishing the site under the general license in 10 CFR section 40.27 (1994). In accordance with the DOE guidance document for long-term surveillance (DOE, 1995), all NRC/DOE interaction on the Burrell site's long-term care now is conducted with the DOE Grand Junction Projects Office in Grand Junction, Colorado, and is no longer the responsibility of the DOE UMTRA Project Team in Albuquerque, New Mexico. Therefore, the planned sampling activities described in this water sampling and analysis plan (WSAP) are limited to the Canonsburg site. This WSAP identifies and justifies the sampling locations, analytical parameters, detection limits, and sampling frequencies for routine monitoring at the Canonsburg site for calendar years 1995 and 1996. Currently, the analytical data further the site characterization and demonstrate that the disposal cell's initial performance is in accordance with design requirements

  19. Space Mission Human Reliability Analysis (HRA) Project

    Science.gov (United States)

    Boyer, Roger

    2014-01-01

    The purpose of the Space Mission Human Reliability Analysis (HRA) Project is to extend current ground-based HRA risk prediction techniques to a long-duration, space-based tool. Ground-based HRA methodology has been shown to be a reasonable tool for short-duration space missions, such as Space Shuttle and lunar fly-bys. However, longer-duration deep-space missions, such as asteroid and Mars missions, will require the crew to be in space for as long as 400 to 900 day missions with periods of extended autonomy and self-sufficiency. Current indications show higher risk due to fatigue, physiological effects due to extended low gravity environments, and others, may impact HRA predictions. For this project, Safety & Mission Assurance (S&MA) will work with Human Health & Performance (HH&P) to establish what is currently used to assess human reliabiilty for human space programs, identify human performance factors that may be sensitive to long duration space flight, collect available historical data, and update current tools to account for performance shaping factors believed to be important to such missions. This effort will also contribute data to the Human Performance Data Repository and influence the Space Human Factors Engineering research risks and gaps (part of the HRP Program). An accurate risk predictor mitigates Loss of Crew (LOC) and Loss of Mission (LOM).The end result will be an updated HRA model that can effectively predict risk on long-duration missions.

  20. Improving Australia's renewable energy project policy and planning: A multiple stakeholder analysis

    International Nuclear Information System (INIS)

    Martin, Nigel; Rice, John

    2015-01-01

    Renewable Energy (RE) is part of Australia's and the world's energy supply matrix with over A$100 billion spent annually on RE projects since 2007. Businesses seeking to invest in RE projects, particularly in the wind and solar energy sectors, may face an onerous collection of planning approvals and permitting processes that impede investment and implementation. In this study, we draw on international and domestic stakeholder inputs to a governmental inquiry in Australia to show how RE projects might be approved in shortened timeframes with reduced associated costs. The process mapping and stakeholder analysis demonstrates that RE supply projects can benefit from standardized approval processes and documentation, a 360° deep engagement with stakeholders, and expanded electricity grid access in resource areas, augmented through supportive public policy and planning frameworks. In addition, stakeholder objections to project approval and implementation streamlining were used to contrast the efficacy of the proposed changes in policy. -- Highlights: •Highlights the over A$200 billion spent annually on global RE projects. •Describes a typical two stage, multi-layered governance RE project approval process. •Exposes long 3 year and multi-million dollar cost approvals for RE projects. •Identifies multi-million dollar remote grid connections as an RE project impediment. •Outlines RE project policy and guidelines shortcomings and proposed improvements

  1. Needs analysis and project schedule for the Los Alamos National Laboratory (LANL) Health Physics Analysis Laboratory (HPAL) upgrade

    International Nuclear Information System (INIS)

    Rhea, T.A.; Rucker, T.L.; Stafford, M.W.

    1990-01-01

    This report is a needs assessment and project schedule for the Health Physics Analysis Laboratory (HPAL) upgrade project at Los Alamos National Laboratory (LANL). After reviewing current and projected HPAL operations, two custom-developed laboratory information management systems (LIMS) for similar facilities were reviewed; four commercially available LIMS products were also evaluated. This project is motivated by new regulations for radiation protection and training and by increased emphasis on quality assurance (QA). HPAL data are used to: protect the health of radiation workers; document contamination levels for transportation of radioactive materials and for release of materials to the public for uncontrolled use; and verify compliance with environmental emission regulations. Phase 1 of the HPAL upgrade project concentrates on four types of counting instruments which support in excess of 90% of the sample workload at the existing central laboratories. Phase 2 is a refinement phase and also integrates summary-level databases on the central Health, Safety, and Environment (HSE) VAX. Phase 3 incorporates additional instrument types and integrates satellite laboratories into the HPAL LIMS. Phase 1 will be a multi-year, multimillion dollar project. The temptation to approach the upgrade of the HPAL program in a piece meal fashion should be avoided. This is a major project, with clearly-defined goals and priorities, and should be approached as such. Major programmatic and operational impacts will be felt throughout HSE as a result of this upgrade, so effective coordination with key customer contacts will be critical

  2. Power Production Analysis of the OE Buoy WEC for the CORES Project

    DEFF Research Database (Denmark)

    Lavelle, John; Kofoed, Jens Peter

    This report describes the analysis performed on the OE Buoy for the CORES project by the wave energy group at Aalborg University, Denmark. OE Buoy is a type of Oscillating Water Column (OWC) wave energy converter as part of the CORES project. This type of device is one of the most developed...... to extract energy from the ocean (1). Typically, a Wells turbine is used for the Power Take Off (PTO) for OWCs. The Wells turbine has the advantage that it is self-rectifying – with the ability to operate with either direction of airflow, which changes during each cycle of the wave. This type of turbine...... which a total of 39 hours of power production data was collected. A data acquisition system was used to sample the sensors on board and the generator shaft power time-series data was used in the analysis here. A wave-rider buoy, located at the site of OE Buoy and operated by the Marine Institute Ireland...

  3. Flexibility analysis of main primary heat transport system : Narora Atomic Power Project

    International Nuclear Information System (INIS)

    Rastogi, S.K.

    1975-01-01

    The paper presents flexibility analysis problem of main primary heat transport system and the approximate analysis that has been made to estimate the loads coming on major equipments. The primary heat transport system for Narora Atomic Power Project is adopting vertical steam generators and pumps equally divided on either side of the reactor with inter-connecting pipes and feeders. Since the system is mainly spring supported with movement of a few points in certain direction defined but no anchorage, it represents a good problem for flexibility analysis which can only be solved in one step by developing a good computer programme. (author)

  4. A projection graphic display for the computer aided analysis of bubble chamber images

    International Nuclear Information System (INIS)

    Solomos, E.

    1979-01-01

    A projection graphic display for aiding the analysis of bubble chamber photographs has been developed by the Instrumentation Group of EF Division at CERN. The display image is generated on a very high brightness cathode ray tube and projected on to the table of the scanning-measuring machines as a superposition to the image of the bubble chamber. The display can send messages to the operator and aid the measurement by indicating directly on the chamber image the tracks which are measured correctly or not. (orig.)

  5. A Requirements-Based Exploration of Open-Source Software Development Projects--Towards a Natural Language Processing Software Analysis Framework

    Science.gov (United States)

    Vlas, Radu Eduard

    2012-01-01

    Open source projects do have requirements; they are, however, mostly informal, text descriptions found in requests, forums, and other correspondence. Understanding such requirements provides insight into the nature of open source projects. Unfortunately, manual analysis of natural language requirements is time-consuming, and for large projects,…

  6. Analysis of Conflict Centers in Projects Procured with Traditional and Integrated Methods in Nigeria

    Directory of Open Access Journals (Sweden)

    Martin O. Dada

    2012-07-01

    Full Text Available Conflicts in any organization can either be functional or dysfunctional and can contribute to or detract from the achievement of organizational or project objectives. This study investigated the frequency and intensity of conflicts, using five conflict centers, on projects executed with either the integrated or traditional method in Nigeria. Questionnaires were administered through purposive and snowballing techniques on 274 projects located in twelve states of Nigeria and Abuja. 94 usable responses were obtained. The collected data were subjected to both descriptive and inferential statistical analysis. In projects procured with traditional methods, conflicts relating to resources for project execution had the greatest frequency, while conflicts around project/client goals had the least frequency. For projects executed with integrated methods, conflicts due to administrative procedures were ranked highest while conflicts due to project/client goals were ranked least. Regarding seriousness of conflict, conflicts due to administrative procedures and resources for project execution were ranked highest respectively for projects procured with traditional and integrated methods. Additionally, in terms of seriousness, personality issues and project/client goals were the least sources of conflict in projects executed with traditional and integrated methods. There were no significant differences in the incidence of conflicts, using the selected conflict centers, between the traditional and integrated procurement methods. There was however significant difference in the intensity or seriousness of conflicts between projects executed with the traditional method and those executed with integrated methods in the following areas: technical issues, administrative matters and personality issues. The study recommends that conscious efforts should be made at teambuilding on projects executed with integrated methods.

  7. Fringe projection application for surface variation analysis on helical shaped silicon breast

    Science.gov (United States)

    Vairavan, R.; Ong, N. R.; Sauli, Z.; Shahimin, M. M.; Kirtsaeng, S.; Sakuntasathien, S.; Alcain, J. B.; Paitong, P.; Retnasamy, V.

    2017-09-01

    Breast carcinoma is rated as a second collective cause of cancer associated death among adult females. Detection of the disease at an early stage would enhance the chance for survival. Established detection methods such as mammography, ultrasound and MRI are classified as non invasive breast cancer detection modality, but however they are not entire non-invasive as physical contact still occurs to the breast. Thus requirement for a complete non invasive and non contact is evident. Therefore, in this work, a novel application of digital fringe projection for early detection of breast cancer based on breast surface analysis is reported. Phase shift fringe projection technique and pixel tracing method was utilized to analyze the breast surface change due to the incidence of breast lump. Results have shown that the digital fringe projection is capable in detecting the existence of 1 cm sized lump within the breast sample.

  8. An ABC analysis for power generation project

    Directory of Open Access Journals (Sweden)

    Batool Hasani

    2013-07-01

    Full Text Available One of the primary concerns on performance measurement is to know how much a particular project cost. However, using traditional method on project-based products often leads to inappropriate results. In this paper, we re-examine this issue by comparing the cost of a power station construction project using ABC versus traditional method. The results of survey show that ABC method is capable of providing better estimates for overhead costs compared with traditional method. In other words, ABC method helps reduce some of the unnecessary overhead cost items and increase on some other cost components. This helps increase the relative efficiency of the system by reducing total cost of project.

  9. Project management in mine actions using Multi-Criteria-Analysis-based decision support system

    Directory of Open Access Journals (Sweden)

    Marko Mladineo

    2014-12-01

    Full Text Available In this paper, a Web-based Decision Support System (Web DSS, that supports humanitarian demining operations and restoration of mine-contaminated areas, is presented. The financial shortage usually triggers a need for priority setting in Project Management in Mine actions. As part of the FP7 Project TIRAMISU, a specialized Web DSS has been developed to achieve a fully transparent priority setting process. It allows stakeholders and donors to actively join the decision making process using a user-friendly and intuitive Web application. The main advantage of this Web DSS is its unique way of managing a mine action project using Multi-Criteria Analysis (MCA, namely the PROMETHEE method, in order to select priorities for demining actions. The developed Web DSS allows decision makers to use several predefined scenarios (different criteria weights or to develop their own, so it allows project managers to compare different demining possibilities with ease.

  10. Social assessment of energy projects. How?

    International Nuclear Information System (INIS)

    Munksgaard, J.; Larsen, A.

    1997-08-01

    This is the final report of the project: Social assessment of Energy Projects. The aim of the project is to improve the basis of working out social assessments of energy projects in practice. The report raises the question: How should social assessments of energy projects be made? A social assessment is using a national perspective, i.e. it accounts the effects of the project for individuals and institutions in Denmark. The assessment is based on economics which means that effects generated by the project are valuated in DKK - as far as possible. The aim of the social assessment is to support a more effective use of the resources in Denmark. A social assessment should include an analysis of the distributional effects. The analysis can be made as an account including a social cash flow analysis. The distribution analysis will illustrate the gains and losses for the different groups of individuals affected carrying out the project. In that way the analysis will show who potentially will support the project and who will be against the project. (EG) EFP-92. 37 refs

  11. Analysis of projected water availability with current basin management plan, Pajaro Valley, California

    Science.gov (United States)

    Hanson, R. T.; Lockwood, B.; Schmid, Wolfgang

    2014-11-01

    The projection and analysis of the Pajaro Valley Hydrologic Model (PVHM) 34 years into the future using MODFLOW with the Farm Process (MF-FMP) facilitates assessment of potential future water availability. The projection is facilitated by the integrated hydrologic model, MF-FMP that fully couples the simulation of the use and movement of water from precipitation, streamflow, runoff, groundwater flow, and consumption by natural and agricultural vegetation throughout the hydrologic system at all times. MF-FMP allows for more complete analysis of conjunctive-use water-resource systems than previously possible with MODFLOW by combining relevant aspects of the landscape with the groundwater and surface-water components. This analysis is accomplished using distributed cell-by-cell supply-constrained and demand-driven components across the landscape within ;water-balance subregions; (WBS) comprised of one or more model cells that can represent a single farm, a group of farms, watersheds, or other hydrologic or geopolitical entities. Analysis of conjunctive use would be difficult without embedding the fully coupled supply-and-demand into a fully coupled simulation, and are difficult to estimate a priori. The analysis of projected supply and demand for the Pajaro Valley indicate that the current water supply facilities constructed to provide alternative local sources of supplemental water to replace coastal groundwater pumpage, but may not completely eliminate additional overdraft. The simulation of the coastal distribution system (CDS) replicates: 20 miles of conveyance pipeline, managed aquifer recharge and recovery (MARR) system that captures local runoff, and recycled-water treatment facility (RWF) from urban wastewater, along with the use of other blend water supplies, provide partial relief and substitution for coastal pumpage (aka in-lieu recharge). The effects of these Basin Management Plan (BMP) projects were analyzed subject to historical climate variations and

  12. Accident consequence calculations for project W-058 safety analysis

    International Nuclear Information System (INIS)

    Van Keuren, J.C.

    1997-01-01

    Accident consequence analyses have been performed for Project W-058, the Replacement Cross Site Transfer System. using the assumption and analysis techniques developed for the Tank Remediation Waste system Basis for Interim Operation. most potential accident involving the FISTS are bounded by the TWRS BIO analysis. However, the spray leak and pool leak scenarios require revised analyses since the RCSTS design utilizes larger diameter pipe and higher pressures than those analyzed in the TWRS BIO. Also the volume of diversion box and vent station are larger than that assumed for the valve pits in the TWRS BIO, which effects results of sprays or spills into the pits. the revised analysis for the spray leak is presented in Section 2, for the above ground spill in Section 3, for the presented in Section 2, for the above ground spill in Section 3, for the subsurface spill forming a pool in Section 4, and for the subsurface pool remaining subsurface in Section 5. The conclusion from these sections are summarized below

  13. Research Project Evaluation-Learnings from the PATHWAYS Project Experience.

    Science.gov (United States)

    Galas, Aleksander; Pilat, Aleksandra; Leonardi, Matilde; Tobiasz-Adamczyk, Beata

    2018-05-25

    Every research project faces challenges regarding how to achieve its goals in a timely and effective manner. The purpose of this paper is to present a project evaluation methodology gathered during the implementation of the Participation to Healthy Workplaces and Inclusive Strategies in the Work Sector (the EU PATHWAYS Project). The PATHWAYS project involved multiple countries and multi-cultural aspects of re/integrating chronically ill patients into labor markets in different countries. This paper describes key project's evaluation issues including: (1) purposes, (2) advisability, (3) tools, (4) implementation, and (5) possible benefits and presents the advantages of a continuous monitoring. Project evaluation tool to assess structure and resources, process, management and communication, achievements, and outcomes. The project used a mixed evaluation approach and included Strengths (S), Weaknesses (W), Opportunities (O), and Threats (SWOT) analysis. A methodology for longitudinal EU projects' evaluation is described. The evaluation process allowed to highlight strengths and weaknesses and highlighted good coordination and communication between project partners as well as some key issues such as: the need for a shared glossary covering areas investigated by the project, problematic issues related to the involvement of stakeholders from outside the project, and issues with timing. Numerical SWOT analysis showed improvement in project performance over time. The proportion of participating project partners in the evaluation varied from 100% to 83.3%. There is a need for the implementation of a structured evaluation process in multidisciplinary projects involving different stakeholders in diverse socio-environmental and political conditions. Based on the PATHWAYS experience, a clear monitoring methodology is suggested as essential in every multidisciplinary research projects.

  14. Project evaluation: main characteristics

    OpenAIRE

    Moutinho, Nuno

    2010-01-01

    — The evaluation process of real investment projects must consider not only the traditional financial approach, but also non-financial aspects. Non financial analysis can provide additional relevant information about projects. We investigate financial and non-financial areas most relevant in project appraisal. We present main critical success factors and areas of analysis that lead to the perception of project success. Finally, companies are segmented to verify its financial and non-financial...

  15. Bringing in the Bard: Shakespearean Plays as Context for Instrumental Analysis Projects

    Science.gov (United States)

    Kloepper, Kathryn D.

    2015-01-01

    Scenes from the works of William Shakespeare were incorporated into individual and group projects for an upper-level chemistry class, instrumental analysis. Students read excerpts from different plays and then viewed a corresponding video clip from a stage or movie production. Guided-research assignments were developed based on these scenes. These…

  16. Influence of organizational and project cultures on project success

    Directory of Open Access Journals (Sweden)

    Berdykulova G. M.

    2017-10-01

    Full Text Available the article is dedicated to studying the influence of organizational and project cultures on effective project management of the company by knowledge systematization and the comparative analysis of world companies’ practice that allowed to reveal the main factors and criteria of projects success and negative influence of organizational culture on the project; key aspects of corporate culture and cultural integration under the conditions of globalization.

  17. An ABC analysis for power generation project

    OpenAIRE

    Batool Hasani; Younos Vakilalroaia

    2013-01-01

    One of the primary concerns on performance measurement is to know how much a particular project cost. However, using traditional method on project-based products often leads to inappropriate results. In this paper, we re-examine this issue by comparing the cost of a power station construction project using ABC versus traditional method. The results of survey show that ABC method is capable of providing better estimates for overhead costs compared with traditional method. In other words, ABC m...

  18. Data Decision Analysis: Project Shoal

    Energy Technology Data Exchange (ETDEWEB)

    Forsgren, Frank; Pohll, Greg; Tracy, John

    1999-01-01

    The purpose of this study was to determine the most appropriate field activities in terms of reducing the uncertainty in the groundwater flow and transport model at the Project Shoal area. The data decision analysis relied on well-known tools of statistics and uncertainty analysis. This procedure identified nine parameters that were deemed uncertain. These included effective porosity, hydraulic head, surface recharge, hydraulic conductivity, fracture correlation scale, fracture orientation, dip angle, dissolution rate of radionuclides from the puddle glass, and the retardation coefficient, which describes the sorption characteristics. The parameter uncertainty was described by assigning prior distributions for each of these parameters. Next, the various field activities were identified that would provide additional information on these parameters. Each of the field activities was evaluated by an expert panel to estimate posterior distribution of the parameters assuming a field activity was performed. The posterior distributions describe the ability of the field activity to estimate the true value of the nine parameters. Monte Carlo techniques were used to determine the current uncertainty, the reduction of uncertainty if a single parameter was known with certainty, and the reduction of uncertainty expected from each field activity on the model predictions. The mean breakthrough time to the downgradient land withdrawal boundary and the peak concentration at the control boundary were used to evaluate the uncertainty reduction. The radionuclide 137Cs was used as the reference solute, as its migration is dependent on all of the parameters. The results indicate that the current uncertainty of the model yields a 95 percent confidence interval between 42 and 1,412 years for the mean breakthrough time and an 18 order-of-magnitude range in peak concentration. The uncertainty in effective porosity and recharge dominates the uncertainty in the model predictions, while the

  19. Automotive Manufacturers' Cost/Revenue, Financial and Risk Analysis : Projected Impact of Automobile Manufacturing on the Plastics Industry

    Science.gov (United States)

    1979-08-01

    The report is part of a study to update the historical and projected cost/revenue analysis of the U.S. domestic automobile manufacturers. It includes the evaluation of the historical and projected financial data to assess the corporate financial posi...

  20. Analysis of Factors Influencing Building Refurbishment Project Performance

    Science.gov (United States)

    Ishak, Nurfadzillah; Aswad Ibrahim, Fazdliel; Azizi Azizan, Muhammad

    2018-03-01

    Presently, the refurbishment approach becomes favourable as it creates opportunities to incorporate sustainable value with other building improvement. In this regard, this approach needs to be implemented due to the issues on overwhelming ratio of existing building to new construction, which also can contribute to the environmental problem. Refurbishment principles imply to minimize the environmental impact and upgrading the performance of an existing building to meet new requirements. In theoretically, building project's performance has a direct bearing on related to its potential for project success. However, in refurbishment building projects, the criteria for measure are become wider because the projects are a complex and multi-dimensional which encompassing many factors which reflect to the nature of works. Therefore, this impetus could be achieve by examine the direct empirical relationship between critical success factors (CSFs) and complexity factors (CFs) during managing the project in relation to delivering success on project performance. The research findings will be expected as the basis of future research in establish appropriate framework that provides information on managing refurbishment building projects and enhancing the project management competency for a better-built environment.

  1. Projection methods for the analysis of molecular-frame photoelectron angular distributions

    International Nuclear Information System (INIS)

    Grum-Grzhimailo, A.N.; Lucchese, R.R.; Liu, X.-J.; Pruemper, G.; Morishita, Y.; Saito, N.; Ueda, K.

    2007-01-01

    A projection method is developed for extracting the nondipole contribution from the molecular frame photoelectron angular distributions of linear molecules. A corresponding convenient parametric form for the angular distributions is derived. The analysis was performed for the N 1s photoionization of the NO molecule a few eV above the ionization threshold. No detectable nondipole contribution was found for the photon energy of 412 eV

  2. Dealing with project complexity by matrix-based propagation modelling for project risk analysis

    OpenAIRE

    Fang , Chao; Marle , Franck

    2012-01-01

    International audience; Engineering projects are facing a growing complexity and are thus exposed to numerous and interdependent risks. In this paper, we present a quantitative method for modelling propagation behaviour in the project risk network. The construction of the network requires the involvement of the project manager and related experts using the Design Structure Matrix (DSM) method. A matrix-based risk propagation model is introduced to calculate risk propagation and thus to re-eva...

  3. Allowing for MSD prevention during facilities planning for a public service: an a posteriori analysis of 10 library design projects.

    Science.gov (United States)

    Bellemare, Marie; Trudel, Louis; Ledoux, Elise; Montreuil, Sylvie; Marier, Micheline; Laberge, Marie; Vincent, Patrick

    2006-01-01

    Research was conducted to identify an ergonomics-based intervention model designed to factor in musculoskeletal disorder (MSD) prevention when library projects are being designed. The first stage of the research involved an a posteriori analysis of 10 recent redesign projects. The purpose of the analysis was to document perceptions about the attention given to MSD prevention measures over the course of a project on the part of 2 categories of employees: librarians responsible for such projects and personnel working in the libraries before and after changes. Subjects were interviewed in focus groups. Outcomes of the analysis can guide our ergonomic assessment of current situations and contribute to a better understanding of the way inclusion or improvement of prevention measures can support the workplace design process.

  4. 360-Degree Rhetorical Analysis of Job Hunting: A Four-Part, Multimodal Project

    Science.gov (United States)

    Ding, Huiling; Ding, Xin

    2013-01-01

    This article proposes the use of a four-component multimodal employment project that offers students a 360-degree understanding of the rhetorical situations surrounding job searches. More specifically, we argue for the use of the four deliverables of written resumes and cover letters, mock oral onsite interview, video resume analysis, and peer…

  5. Criteria for Developing a Successful Privatization Project

    Science.gov (United States)

    1989-05-01

    conceptualization and planning are required when pursuing privatization projects. In fact, privatization project proponents need to know how to...selection of projects for analysis, methods of acquiring information about these projects, and the analysis framwork . Chapter IV includes the analysis. A...performed an analysis to determine cormion conceptual and creative approaches and lessons learned. This analysis was then used to develop criteria for

  6. CONTENT ANALYSIS IN PROJECT MANAGEMENT: PROPOSALOF A METHODOLOGICAL FRAMEWORK

    Directory of Open Access Journals (Sweden)

    Alessandro Prudêncio Lukosevicius

    2016-12-01

    Full Text Available Content analysis (CA is a popular approach among researchers from different areas, but incipient in project management (PM. However, the volume of usage apparently does not translate into application quality. The method receives constant criticism about the scientific rigor adopted, especially when led by junior researchers. This article proposes a methodological framework for CA and investigate the use of CA in PM research. To accomplish this goal, literature systematic review is conjugated with CA related to 23 articles from EBSCO base in the last 20 years (1996 – 2016. The findings showed that the proposed framework can help researchers better apply the CA and suggests that the use of the method in terms of quantity and quality in PM research should be expanded. In addition to the framework, another contribution of this research is an analysis of the use of CA in PM in the last 20 years.

  7. The Analysis of Project Finance: a Case Study of Kazakhstan Caspian Transportation System Project

    OpenAIRE

    Serikbayeva, Aigul

    2011-01-01

    Although project finance is a large and fast growing field in finance, there has been very little academic research in that area. The main reason for this deficit is that it is a relatively new sphere in finance and it is difficult to access the information about the implementation of projects from the companies that implement them. This project will provide an overview of how companies finance large infrastructure projects through a case study of the Kazakhstan Caspian Transportation System ...

  8. The no-project alternative analysis: An early product of the Tahoe Decision Support System

    Science.gov (United States)

    Halsing, David L.; Hessenflow, Mark L.; Wein, Anne

    2005-01-01

    We report on the development of a No-project alternative analysis (NPAA) or “business as usual” scenario with respect to a 20-year projection of 21 indicators of environmental and socioeconomic conditions in the Lake Tahoe Basin for the Tahoe Regional Planning Agency (TRPA). Our effort was inspired by earlier work that investigated the tradeoffs between an environmental and an economic objective. The NPAA study has implications for a longer term goal of building a Tahoe Decision Support System (TDSS) to assist the TRPA and other Basin agencies in assessing the outcomes of management strategies. The NPAA assumes no major deviations from current management practices or from recent environmental or societal trends and planned Environmental Improvement Program (EIP) projects. Quantitative “scenario generation” tools were constructed to simulate site-specific land uses, various population categories, and associated vehicle miles traveled. Projections of each indicator’s attainment status were made by building visual conceptual models of the relevant natural and social processes, extrapolating trends, and using available models, research, and expert opinion. We present results of the NPAA, projected indicator status, key factors affecting the indicators, indicator functionality, and knowledge gaps. One important result is that current management practices may slow the loss or degradation of environmental qualities but not halt or reverse it. Our analysis also predicts an increase in recreation and commuting into and within the basin, primarily in private vehicles. Private vehicles, which are a critical mechanism by which the Basin population affects the surrounding environment, are a key determinant of air-quality indicators, a source of particulate matter affecting Secchi depth, a source of noise, and a factor in recreational and scenic quality, largely owing to congestion. Key uncertainties in the NPAA include climate change, EIP project effectiveness, and

  9. UMTRA project water sampling and analysis plan -- Shiprock, New Mexico

    International Nuclear Information System (INIS)

    1994-02-01

    Water sampling and analysis plan (WSAP) is required for each U.S. Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project site to provide a basis for ground water and surface water sampling at disposal and former processing sites. This WSAP identifies and justifies the sampling locations, analytical parameters, detection limits, and sampling frequency for the monitoring stations at the Navaho Reservation in Shiprock, New Mexico, UMTRA Project site. The purposes of the water sampling at Shiprock for fiscal year (FY) 1994 are to (1) collect water quality data at new monitoring locations in order to build a defensible statistical data base, (2) monitor plume movement on the terrace and floodplain, and (3) monitor the impact of alluvial ground water discharge into the San Juan River. The third activity is important because the community of Shiprock withdraws water from the San Juan River directly across from the contaminated alluvial floodplain below the abandoned uranium mill tailings processing site

  10. Clustering analysis for muon tomography data elaboration in the Muon Portal project

    Science.gov (United States)

    Bandieramonte, M.; Antonuccio-Delogu, V.; Becciani, U.; Costa, A.; La Rocca, P.; Massimino, P.; Petta, C.; Pistagna, C.; Riggi, F.; Riggi, S.; Sciacca, E.; Vitello, F.

    2015-05-01

    Clustering analysis is one of multivariate data analysis techniques which allows to gather statistical data units into groups, in order to minimize the logical distance within each group and to maximize the one between different groups. In these proceedings, the authors present a novel approach to the muontomography data analysis based on clustering algorithms. As a case study we present the Muon Portal project that aims to build and operate a dedicated particle detector for the inspection of harbor containers to hinder the smuggling of nuclear materials. Clustering techniques, working directly on scattering points, help to detect the presence of suspicious items inside the container, acting, as it will be shown, as a filter for a preliminary analysis of the data.

  11. Research Project Evaluation—Learnings from the PATHWAYS Project Experience

    Directory of Open Access Journals (Sweden)

    Aleksander Galas

    2018-05-01

    Full Text Available Background: Every research project faces challenges regarding how to achieve its goals in a timely and effective manner. The purpose of this paper is to present a project evaluation methodology gathered during the implementation of the Participation to Healthy Workplaces and Inclusive Strategies in the Work Sector (the EU PATHWAYS Project. The PATHWAYS project involved multiple countries and multi-cultural aspects of re/integrating chronically ill patients into labor markets in different countries. This paper describes key project’s evaluation issues including: (1 purposes, (2 advisability, (3 tools, (4 implementation, and (5 possible benefits and presents the advantages of a continuous monitoring. Methods: Project evaluation tool to assess structure and resources, process, management and communication, achievements, and outcomes. The project used a mixed evaluation approach and included Strengths (S, Weaknesses (W, Opportunities (O, and Threats (SWOT analysis. Results: A methodology for longitudinal EU projects’ evaluation is described. The evaluation process allowed to highlight strengths and weaknesses and highlighted good coordination and communication between project partners as well as some key issues such as: the need for a shared glossary covering areas investigated by the project, problematic issues related to the involvement of stakeholders from outside the project, and issues with timing. Numerical SWOT analysis showed improvement in project performance over time. The proportion of participating project partners in the evaluation varied from 100% to 83.3%. Conclusions: There is a need for the implementation of a structured evaluation process in multidisciplinary projects involving different stakeholders in diverse socio-environmental and political conditions. Based on the PATHWAYS experience, a clear monitoring methodology is suggested as essential in every multidisciplinary research projects.

  12. Low-Cost Mapping and Publishing Methods for Landscape Architectural Analysis and Design in Slum-Upgrading Projects

    Directory of Open Access Journals (Sweden)

    Jörg Rekittke

    2011-10-01

    Full Text Available The research project “Grassroots GIS” focuses on the development of low-cost mapping and publishing methods for slums and slum-upgrading projects in Manila. In this project smartphones, collaborative mapping and 3D visualization applications are systematically employed to support landscape architectural analysis and design work in the context of urban poverty and urban informal settlements. In this paper we focus on the description of the developed methods and present preliminary results of this work-in-progress.

  13. Integral Cost-Benefit Analysis of Maglev Rail Projects Under Market Imperfections

    Directory of Open Access Journals (Sweden)

    J. Paul Elhorst

    2008-07-01

    Full Text Available This article evaluates a new mode of high speed ground transportation, the magnetic levitation rail system (Maglev. The outcomes of this evaluation provide policy information on the interregional redistribution of employment and population and the national welfare improvement of two Dutch urban-conglomeration and two Dutch core-periphery projects. This article also compares the results of an integral cost- benefit analysis with those of a conventional cost-benefit analysis and concludes that the additional economic benefits due to market imperfections vary from –1% to +38% of the direct transport benefits, depending on the type of regions connected and the general condition of the economy.

  14. PROJECT ACTIVITY ANALYSIS WITHOUT THE NETWORK MODEL

    Directory of Open Access Journals (Sweden)

    S. Munapo

    2012-01-01

    Full Text Available

    ENGLISH ABSTRACT: This paper presents a new procedure for analysing and managing activity sequences in projects. The new procedure determines critical activities, critical path, start times, free floats, crash limits, and other useful information without the use of the network model. Even though network models have been successfully used in project management so far, there are weaknesses associated with the use. A network is not easy to generate, and dummies that are usually associated with it make the network diagram complex – and dummy activities have no meaning in the original project management problem. The network model for projects can be avoided while still obtaining all the useful information that is required for project management. What are required are the activities, their accurate durations, and their predecessors.

    AFRIKAANSE OPSOMMING: Die navorsing beskryf ’n nuwerwetse metode vir die ontleding en bestuur van die sekwensiële aktiwiteite van projekte. Die voorgestelde metode bepaal kritiese aktiwiteite, die kritieke pad, aanvangstye, speling, verhasing, en ander groothede sonder die gebruik van ’n netwerkmodel. Die metode funksioneer bevredigend in die praktyk, en omseil die administratiewe rompslomp van die tradisionele netwerkmodelle.

  15. Identifying Obstacles and Research Gaps of Telemedicine Projects: Approach for a State-of-the-Art Analysis.

    Science.gov (United States)

    Harst, Lorenz; Timpel, Patrick; Otto, Lena; Wollschlaeger, Bastian; Richter, Peggy; Schlieter, Hannes

    2018-01-01

    This paper presents an approach for an evaluation of finished telemedicine projects using qualitative methods. Telemedicine applications are said to improve the performance of health care systems. While there are countless telemedicine projects, the vast majority never makes the threshold from testing to implementation and diffusion. Projects were collected from German project databases in the area of telemedicine following systematically developed criteria. In a testing phase, ten projects were subject to a qualitative content analysis to identify limitations, need for further research, and lessons learned. Using Mayring's method of inductive category development, six categories of possible future research were derived. Thus, the proposed method is an important contribution to diffusion and translation research regarding telemedicine, as it is applicable to a systematic research of databases.

  16. Evaluation of the Three Gorges Dam project using multi-criteria analysis (MCA) based on a sustainable perspective

    Science.gov (United States)

    Han, Yue; Zheng, Wei; Guo, Junshan; Ma, Yihe; Ding, Junqi; Zhu, Lingkai; Che, Yongqiang; Zhang, Yanpeng

    2018-02-01

    Abstract . The Three Gorges dam of China is one of the largest and expensive hydropower projects of the world. The four main purposes of the project are flood control,energy production, improved navigation and fresh water supply. The dam project has been completed and running successfully with the potential benefits. However, this project is still a controversial issue among many environmentalists and socialists due to various impacts. This study focuses on the benefit and the impacts of the project, and also evaluates the performance of the project using multi-criteria analysis (MCA) approach from a sustainable perspective. Different sustainability criteria related with the dam project have been identified and used for the ranking and rating process. The final result of MCA comes with this scoring process and pairwise comparison, which evaluates the performance of the project considering different positive and negative aspects.

  17. Project development for mining-metallurgical complexes for production of uranium concentrates - an analysis and a methodology

    International Nuclear Information System (INIS)

    Ajuria G, S.; Blanco P, B.; Pena A, J.; Manzanera Q, C.

    1978-10-01

    Activities comprising the development of a project for a mining-metallurgical complex for production of uranium concentrates, from sampling and evaluation of an orebody until plant start-up, are analyzed. The analysis of the orebody, characterization of the ore, bench scale and pilot plant metallurgical studies, environmental studies and economic analyses of the project are described. The mining project and mine preparation and engineering and construction of the plant are reviewed in less detail. The estimated time lapse for the development of a typical project under ideal conditions is 66 months. A bar diagram is included showing an approximate timetable for each activity. (author)

  18. Risk management of PPP project in the preparation stage based on Fault Tree Analysis

    Science.gov (United States)

    Xing, Yuanzhi; Guan, Qiuling

    2017-03-01

    The risk management of PPP(Public Private Partnership) project can improve the level of risk control between government departments and private investors, so as to make more beneficial decisions, reduce investment losses and achieve mutual benefit as well. Therefore, this paper takes the PPP project preparation stage venture as the research object to identify and confirm four types of risks. At the same time, fault tree analysis(FTA) is used to evaluate the risk factors that belong to different parts, and quantify the influencing degree of risk impact on the basis of risk identification. In addition, it determines the importance order of risk factors by calculating unit structure importance on PPP project preparation stage. The result shows that accuracy of government decision-making, rationality of private investors funds allocation and instability of market returns are the main factors to generate the shared risk on the project.

  19. Stress analysis of HLW containers advanced test work Compas project

    International Nuclear Information System (INIS)

    Ove Arup and Partners

    1990-01-01

    The Compas project is concerned with the structural performance of metal overpacks which may be used to encapsulate vitrified high-level waste forms before disposal in deep geological repositories. This document describes the activities performed between June and August 1989 forming the advanced test work phase of this project. This is the culmination of two years' analysis and test work to demonstrate whether the analytical ability exists to model containers subjected to realistic loads. Three mild steel containers were designed and manufactured to be one-third scale models of a realistic HLW container, modified to represent the effect of anisotropic loading and to facilitate testing. The containers were tested under a uniform external pressure and all failed by buckling in the mid-body region. The outer surface of each container was comprehensively strain-gauged to provide strain history data at all positions of interest. In parallel with the test work, Compas project partners, from five different European countries, independently modelled the behaviour of each of the containers using their computer codes to predict the failure pressure and produce strain history data at a number of specified locations. The first axisymmetric container was well modelled but predictions for the remaining two non-axisymmetric containers were much more varied, with differences of up to 50% occurring between failure predictions and test data

  20. Fermeuse wind power project Newfoundland : noise and visual analysis studies

    Energy Technology Data Exchange (ETDEWEB)

    Henn, P.; Turgeon, J.; Heraud, P.; Belanger, S.; Dakousian, S.; Lamontagne, C.; Soares, D. [Helimax Energy Inc., Montreal, PQ (Canada); Basil, C.; Boulianne, S.; Salacup, S.; Thompson, C. [Skypower, Toronto, ON (Canada)

    2008-03-15

    This paper discussed the noise and visual analyses used to assess the potential impacts of a wind energy project on the east coast of the Avalon Peninsula near St. John's, Newfoundland. The proposed farm will be located approximately 1 km away from the town of Fermeuse, and will have an installed capacity of 27 MW from 9 turbines. The paper provided details of the consultation process conducted to determine acceptable distance and site locations for the wind turbines from the community. Stakeholders were identified during meetings, events, and discussions with local authorities. Consultations were also held with government agencies and municipal councils. A baseline acoustic environment study was conducted, and details of anticipated environmental impacts during the project's construction, operation, and decommissioning phases were presented. The visual analysis study was divided into the following landscape units: town, shoreline, forest, open land and lacustrine landscapes. The effect of the turbines on the landscapes were assessed from different viewpoints using visual simulation programs. The study showed that the visual effects of the project are not considered as significant because of the low number of turbines. It was concluded that the effect of construction on ambient noise levels is of low concern as all permanent dwellings are located at least 1 km away from the turbines. 2 refs., 4 tabs., 4 figs.

  1. UMTRA project water sampling and analysis plan, Monument Valley, Arizona

    International Nuclear Information System (INIS)

    1994-04-01

    The Monument Valley Uranium Mill Tailings Remedial Action (UMTRA) Project site in Cane Valley is a former uranium mill that has undergone surface remediation in the form of tailings and contaminated materials removal. Contaminated materials from the Monument Valley (Arizona) UMTRA Project site have been transported to the Mexican Hat (Utah) UMTRA Project site for consolidation with the Mexican Hat tailings. Tailings removal was completed in February 1994. Three geologic units at the site contain water: the unconsolidated eolian and alluvial deposits (alluvial aquifer), the Shinarump Conglomerate (Shinarump Member), and the De Chelly Sandstone. Water quality analyses indicate the contaminant plume has migrated north of the site and is mainly in the alluvial aquifer. An upward hydraulic gradient in the De Chelly Sandstone provides some protection to that aquifer. This water sampling and analysis plan recommends sampling domestic wells, monitor wells, and surface water in April and September 1994. The purpose of sampling is to continue periodic monitoring for the surface program, evaluate changes to water quality for site characterization, and provide data for the baseline risk assessment. Samples taken in April will be representative of high ground water levels and samples taken in September will be representative of low ground water levels. Filtered and nonfiltered samples will be analyzed for plume indicator parameters and baseline risk assessment parameters

  2. Analysis of Factors Influencing Building Refurbishment Project Performance

    Directory of Open Access Journals (Sweden)

    Ishak Nurfadzillah

    2018-01-01

    Full Text Available Presently, the refurbishment approach becomes favourable as it creates opportunities to incorporate sustainable value with other building improvement. In this regard, this approach needs to be implemented due to the issues on overwhelming ratio of existing building to new construction, which also can contribute to the environmental problem. Refurbishment principles imply to minimize the environmental impact and upgrading the performance of an existing building to meet new requirements. In theoretically, building project’s performance has a direct bearing on related to its potential for project success. However, in refurbishment building projects, the criteria for measure are become wider because the projects are a complex and multi-dimensional which encompassing many factors which reflect to the nature of works. Therefore, this impetus could be achieve by examine the direct empirical relationship between critical success factors (CSFs and complexity factors (CFs during managing the project in relation to delivering success on project performance. The research findings will be expected as the basis of future research in establish appropriate framework that provides information on managing refurbishment building projects and enhancing the project management competency for a better-built environment.

  3. The analysis of projected fission track lengths

    International Nuclear Information System (INIS)

    Laslett, G.M.; Galbraith, R.F.; Green, P.F.

    1994-01-01

    This article deals with the question of how features of the thermal history can be estimated from projected track length measurements, i.e. lengths of the remaining parts of tracks that have intersected a surface, projected onto that surface. The appropriate mathematical theory is described and used to provide a sound basis both for understanding the nature of projected length measurements and for analysing observed data. The estimation of thermal history parameters corresponding to the current temperature, the maximum palaeotemperature and the time since cooling, is studied using laboratory data and simulations. In general the information contained in projected track lengths and angles is fairly limited, compared, for example, with that from a much smaller number of confined tracks, though we identify some circumstances when such measurements may be useful. Also it is not straightforward to extract the information and simple ad hoc estimation methods are generally inadequate. (author)

  4. Grid Databases for Shared Image Analysis in the MammoGrid Project

    CERN Document Server

    Amendolia, S R; Hauer, T; Manset, D; McClatchey, R; Odeh, M; Reading, T; Rogulin, D; Schottlander, D; Solomonides, T

    2004-01-01

    The MammoGrid project aims to prove that Grid infrastructures can be used for collaborative clinical analysis of database-resident but geographically distributed medical images. This requires: a) the provision of a clinician-facing front-end workstation and b) the ability to service real-world clinician queries across a distributed and federated database. The MammoGrid project will prove the viability of the Grid by harnessing its power to enable radiologists from geographically dispersed hospitals to share standardized mammograms, to compare diagnoses (with and without computer aided detection of tumours) and to perform sophisticated epidemiological studies across national boundaries. This paper outlines the approach taken in MammoGrid to seamlessly connect radiologist workstations across a Grid using an "information infrastructure" and a DICOM-compliant object model residing in multiple distributed data stores in Italy and the UK

  5. Fuzzy decision analysis for project scope change management

    Directory of Open Access Journals (Sweden)

    Farshad Shirazi

    2017-09-01

    Full Text Available It is very important to manage and control projects with the consideration of the triple constraints; namely time, cost and scope. It is also extremely important to manage the scope and all the procurements needed to complete any project. During the project’s lifecycle many changes take place, either positively or negatively, which should be controlled. If the changes are not controlled we may have scope creep that has negative effect on the project. It is commonly considered a negative incident, and thus, should be kept away from the project. By considering this concept, in this paper, we discuss scope change and managing scope and fuzzy analytical hierarchy process is used in selecting the best strategy to manage scope change in projects.

  6. The Use of Personal Projects Analysis to Enhance Occupational Therapy Goal Identification

    Directory of Open Access Journals (Sweden)

    Mary Egan

    2016-01-01

    Full Text Available Background: Client-centered occupational therapy begins with the identification of personally-relevant patient goals. This study aimed to determine whether the elicitation module of Personal Projects Analysis (PPA could help patients in an acquired brain injury day hospital program identify more meaningful goals than those identified using the Canadian Occupational Performance Measure (COPM alone. Method: Ten patients completed the COPM. They rated the importance of each goal and their confidence that they could attain each goal. During the next session, using the elicitation module of PPA, they identified personal projects just prior to their brain injuries, current personal projects, and future desired personal projects. They were then invited to revise their COPM goals and re-rate them for importance and confidence. Results: Following completion of the elicitation module of PPA, seven participants changed at least one goal. Of the goals that were changed, half were revised to include the mention of another person. There were no significant changes in average goal importance or perceived attainability. Occupational therapists reported that the elicitation module of PPA helped them get to know their patients better and identify potential therapeutic occupations. Discussion: The elicitation module of PPA may help people develop goals that are more embedded in their social contexts.

  7. Stakeholders of Voluntary Forest Carbon Offset Projects in China: An Empirical Analysis

    Directory of Open Access Journals (Sweden)

    Derong Lin

    2015-01-01

    Full Text Available Climate change is one of the defining challenges facing the planet. Voluntary forest carbon offset project which has the potential to boost forest carbon storage and mitigate global warming has aroused the global concern. The objective of this paper is to model the game situation and analyze the game behaviors of stakeholders of voluntary forest carbon offset projects in China. A stakeholder model and a Power-Benefit Matrix are constructed to analyze the roles, behaviors, and conflicts of stakeholders including farmers, planting entities, communities, government, and China Green Carbon Foundation. The empirical analysis results show that although the stakeholders have diverse interests and different goals, a win-win solution is still possible through their joint participation and compromise in the voluntary forest carbon offset project. A wide governance structure laying emphasis on benefit balance, equality, and information exchanges and being regulated by all stakeholders has been constructed. It facilitates the agreement among the stakeholders with conflicting or different interests. The joint participation of stakeholders in voluntary forest carbon offset projects might change the government-dominated afforestation/reforestation into a market, where all participators including government are encouraged to cooperate with each other to improve the condition of fund shortage and low efficiency.

  8. Accident consequence calculations for project W-058 safety analysis

    International Nuclear Information System (INIS)

    Van Keuren, J.C.

    1997-01-01

    This document describes the calculations performed to determine the accident consequences for the W-058 safety analysis. Project W-058 is the replacement cross site transfer system (RCSTS), which is designed to transort liquid waste between the 200 W and 200 E areas. Calculations for RCSTS safety analyses used the same methods as the calculations for the Tank Waste Remediation System (TWRS) Basis for Interim Operation (BIO) and its supporting calculation notes. Revised analyses were performed for the spray and pool leak accidents since the RCSTS flows and pressures differ from those assumed in the TWRS BIO. Revision 1 of the document incorporates review comments

  9. Solid waste integrated cost analysis model: 1991 project year report

    Energy Technology Data Exchange (ETDEWEB)

    1991-01-01

    The purpose of the City of Houston's 1991 Solid Waste Integrated Cost Analysis Model (SWICAM) project was to continue the development of a computerized cost analysis model. This model is to provide solid waste managers with tool to evaluate the dollar cost of real or hypothetical solid waste management choices. Those choices have become complicated by the implementation of Subtitle D of the Resources Conservation and Recovery Act (RCRA) and the EPA's Integrated Approach to managing municipal solid waste;. that is, minimize generation, maximize recycling, reduce volume (incinerate), and then bury (landfill) only the remainder. Implementation of an integrated solid waste management system involving all or some of the options of recycling, waste to energy, composting, and landfilling is extremely complicated. Factors such as hauling distances, markets, and prices for recyclable, costs and benefits of transfer stations, and material recovery facilities must all be considered. A jurisdiction must determine the cost impacts of implementing a number of various possibilities for managing, handling, processing, and disposing of waste. SWICAM employs a single Lotus 123 spreadsheet to enable a jurisdiction to predict or assess the costs of its waste management system. It allows the user to select his own process flow for waste material and to manipulate the model to include as few or as many options as he or she chooses. The model will calculate the estimated cost for those choices selected. The user can then change the model to include or exclude waste stream components, until the mix of choices suits the user. Graphs can be produced as a visual communication aid in presenting the results of the cost analysis. SWICAM also allows future cost projections to be made.

  10. Wear-Out Sensitivity Analysis Project Abstract

    Science.gov (United States)

    Harris, Adam

    2015-01-01

    During the course of the Summer 2015 internship session, I worked in the Reliability and Maintainability group of the ISS Safety and Mission Assurance department. My project was a statistical analysis of how sensitive ORU's (Orbital Replacement Units) are to a reliability parameter called the wear-out characteristic. The intended goal of this was to determine a worst case scenario of how many spares would be needed if multiple systems started exhibiting wear-out characteristics simultaneously. The goal was also to determine which parts would be most likely to do so. In order to do this, my duties were to take historical data of operational times and failure times of these ORU's and use them to build predictive models of failure using probability distribution functions, mainly the Weibull distribution. Then, I ran Monte Carlo Simulations to see how an entire population of these components would perform. From here, my final duty was to vary the wear-out characteristic from the intrinsic value, to extremely high wear-out values and determine how much the probability of sufficiency of the population would shift. This was done for around 30 different ORU populations on board the ISS.

  11. Analysis of the project parameters of the fixed price projects in the IT services delivery organization

    Directory of Open Access Journals (Sweden)

    Miroslav Kral

    2012-04-01

    Full Text Available The success rate of IS/IT projects is low. Thus, in response, a large variety of methods and approaches to managing IS/IT projects has been developed over the years. The purpose of this paper is to analyse the relationships between the project parameters of fixed-price projects that take place within an IT service delivery organization. There is some evidence that simply using traditional project parameters (such as project duration, costs, reserves, and so on isn't enough to increase the success of projects; rather, new approaches and methods, including our applied systems approach, should also be considered. This paper aims to highlight issues from the perspective of an IT services delivery organization from the CEE region. The output of the paper should be a contribution to the project management of IS/IT projects and to systems research, as well.

  12. Continuous improvement projects: an authorship bibliometric analysis.

    Science.gov (United States)

    Gonzalez Aleu, Fernando; Van Aken, Eileen M

    2017-06-12

    Purpose The purpose of this paper is to describe the current research on hospital continuous improvement projects (CIPs) from an author characteristics' perspective. This work addresses the following questions: who are the predominant research authors in hospital CIPs? To what extent are the research communities collaborating in distinct research groups? How internationalized has hospital CIPs research become with respect to author location? Design/methodology/approach A systematic literature review was conducted, identifying 302 academic publications related to hospital CIPs. Publications were analyzed using: author, quantity, diversity, collaboration, and impact. Findings Hospital CIPs are increasingly attracting new scholars each year. Based on the authors' analysis, authors publishing in this area can be described as a relatively new international community given the countries represented. Originality/value This paper describes the current hospital CIP research by assessing author characteristics. Future work should examine additional attributes to characterize maturity such as how new knowledge is being created and to what extent new knowledge is being disseminated to practitioners.

  13. Numerical Analysis of Soil Settlement Prediction and Its Application In Large-Scale Marine Reclamation Artificial Island Project

    Directory of Open Access Journals (Sweden)

    Zhao Jie

    2017-11-01

    Full Text Available In an artificial island construction project based on the large-scale marine reclamation land, the soil settlement is a key to affect the late safe operation of the whole field. To analyze the factors of the soil settlement in a marine reclamation project, the SEM method in the soil micro-structural analysis method is used to test and study six soil samples such as the representative silt, mucky silty clay, silty clay and clay in the area. The structural characteristics that affect the soil settlement are obtained by observing the SEM charts at different depths. By combining numerical calculation method of Terzaghi’s one-dimensional and Biot’s two-dimensional consolidation theory, the one-dimensional and two-dimensional creep models are established and the numerical calculation results of two consolidation theories are compared in order to predict the maximum settlement of the soils 100 years after completion. The analysis results indicate that the micro-structural characteristics are the essential factor to affect the settlement in this area. Based on numerical analysis of one-dimensional and two-dimensional settlement, the settlement law and trend obtained by two numerical analysis method is similar. The analysis of this paper can provide reference and guidance to the project related to the marine reclamation land.

  14. Analysis of the production and transaction costs of forest carbon offset projects in the USA.

    Science.gov (United States)

    Galik, Christopher S; Cooley, David M; Baker, Justin S

    2012-12-15

    Forest carbon offset project implementation costs, comprised of both production and transaction costs, could present an important barrier to private landowner participation in carbon offset markets. These costs likewise represent a largely undocumented component of forest carbon offset potential. Using a custom spreadsheet model and accounting tool, this study examines the implementation costs of different forest offset project types operating in different forest types under different accounting and sampling methodologies. Sensitivity results are summarized concisely through response surface regression analysis to illustrate the relative effect of project-specific variables on total implementation costs. Results suggest that transaction costs may represent a relatively small percentage of total project implementation costs - generally less than 25% of the total. Results also show that carbon accounting methods, specifically the method used to establish project baseline, may be among the most important factors in driving implementation costs on a per-ton-of-carbon-sequestered basis, dramatically increasing variability in both transaction and production costs. This suggests that accounting could be a large driver in the financial viability of forest offset projects, with transaction costs likely being of largest concern to those projects at the margin. Copyright © 2012 Elsevier Ltd. All rights reserved.

  15. An analysis of the impact of the thermonuclear pilot project ITER on industry and research in Austria

    International Nuclear Information System (INIS)

    Hangel, G.

    2007-03-01

    An analysis of the influence of the thermonuclear pilot project ITER on Austrian research and industrial activities is presented in terms of the following subjects: fusion research history, ITER technique, security, nuclear fusion, ITER (reactor, project specifications for quotations), possibilities for Austrian companies and fusion research in Austria. (nevyjel)

  16. A successful waste stream analysis on a large construction project in a radiologically controlled area

    International Nuclear Information System (INIS)

    Kennicott, M.; Richardson, D.; Starke, T.P.

    1997-01-01

    The Los Alamos National Laboratory (the Laboratory) Chemistry and Metallurgy Research (CMR) Facility, constructed in 1952, is currently under going a major, multi-year demolition and construction project. Many of the operations required under this project (i.e., design, demolition, decontamination, construction, and waste management) mimic the processes required of a large scale decontamination and decommissioning (D and D) job and are identical to the requirements of any of several upgrades projects anticipated for the laboratory and other Department of Energy (DOE) sites. For these reasons the CMR upgrades Project is seen as an ideal model facility--to test the application and measure the success of waste minimization techniques which could be implemented for any similar projects. The purpose of this paper will be to discuss the successful completion of a waste stream analysis. The analyses performed was to measure the potential impact of waste generation, in terms of volume and costs, for a reconfiguration option being considered to change the approach and execution of the original project

  17. Analysis on the choice of the most suitable metal prices in a mining investment project

    International Nuclear Information System (INIS)

    Torre, L. de la; Espi, J. a.

    2014-01-01

    The mineral price assigned in mining project design is critical to determining the economic feasibility of a project. Nevertheless, although it is not difficult to find literature about market metal prices, it is much more complicated to achieve a specific methodology for calculating the value or which justifications are appropriate to include. This study presents an analysis of various methods for selecting metal prices and investigates the mechanisms and motives underlying price selections. The results describe various attitudes adopted by the designers of mining investment project, and how the price can be determined not just by means of forecasting also by consideration of other relevant parameters. (Author)

  18. The Alcohol Dehydrogenase Kinetics Laboratory: Enhanced Data Analysis and Student-Designed Mini-Projects

    Science.gov (United States)

    Silverstein, Todd P.

    2016-01-01

    A highly instructive, wide-ranging laboratory project in which students study the effects of various parameters on the enzymatic activity of alcohol dehydrogenase has been adapted for the upper-division biochemistry and physical biochemistry laboratory. Our two main goals were to provide enhanced data analysis, featuring nonlinear regression, and…

  19. The construction project manager in South Africa: Analysis of ...

    African Journals Online (AJOL)

    Journal Home > Vol 22, No 1 (2015) > ... Construction project managers in the built environment come from various backgrounds and knowledge bases; therefore, the project managers' project ... Industry-specific guidelines for construction project management (PMBOK and SACPCMP) were obtained and analysed.

  20. HANFORD DOUBLE SHELL TANK (DST) THERMAL & SEISMIC PROJECT SEISMIC ANALYSIS OF HANFORD DOUBLE SHELL TANKS

    Energy Technology Data Exchange (ETDEWEB)

    MACKEY, T.C.

    2006-03-17

    M&D Professional Services, Inc. (M&D) is under subcontract to Pacific Northwest National Laboratory (PNNL) to perform seismic analysis of the Hanford Site double-shell tanks (DSTs) in support of a project entitled ''Double-Shell Tank (DSV Integrity Project--DST Thermal and Seismic Analyses)''. The overall scope of the project is to complete an up-to-date comprehensive analysis of record of the DST system at Hanford in support of Tri-Party Agreement Milestone M-48-14, The work described herein was performed in support of the seismic analysis of the DSTs. The thermal and operating loads analysis of the DSTs is documented in Rinker et al. (2004). The work statement provided to M&D (PNNL 2003) required that the seismic analysis of the DSTs assess the impacts of potentially non-conservative assumptions in previous analyses and account for the additional soil mass due to the as-found soil density increase, the effects of material degradation, additional thermal profiles applied to the full structure including the soil-structure response with the footings, the non-rigid (low frequency) response of the tank roof, the asymmetric seismic-induced soil loading, the structural discontinuity between the concrete tank wall and the support footing and the sloshing of the tank waste. The seismic analysis considers the interaction of the tank with the surrounding soil and the effects of the primary tank contents. The DSTs and the surrounding soil are modeled as a system of finite elements. The depth and width of the soil incorporated into the analysis model are sufficient to obtain appropriately accurate analytical results. The analyses required to support the work statement differ from previous analysis of the DSTs in that the soil-structure interaction (SSI) model includes several (nonlinear) contact surfaces in the tank structure, and the contained waste must be modeled explicitly in order to capture the fluid-structure interaction behavior between the primary

  1. Graduate Student Project: Employer Operations Management Analysis

    Science.gov (United States)

    Fish, Lynn A.

    2008-01-01

    Part-time graduate students at an Association to Advance Collegiate Schools of Business-accredited college complete a unique project by applying operations management concepts to their current employer. More than 92% of 368 graduates indicated that this experiential project was a positive learning experience, and results show a positive impact on…

  2. Statistical Projections for Multi-resolution, Multi-dimensional Visual Data Exploration and Analysis

    Energy Technology Data Exchange (ETDEWEB)

    Nguyen, Hoa T. [Univ. of Utah, Salt Lake City, UT (United States); Stone, Daithi [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Bethel, E. Wes [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2016-01-01

    An ongoing challenge in visual exploration and analysis of large, multi-dimensional datasets is how to present useful, concise information to a user for some specific visualization tasks. Typical approaches to this problem have proposed either reduced-resolution versions of data, or projections of data, or both. These approaches still have some limitations such as consuming high computation or suffering from errors. In this work, we explore the use of a statistical metric as the basis for both projections and reduced-resolution versions of data, with a particular focus on preserving one key trait in data, namely variation. We use two different case studies to explore this idea, one that uses a synthetic dataset, and another that uses a large ensemble collection produced by an atmospheric modeling code to study long-term changes in global precipitation. The primary findings of our work are that in terms of preserving the variation signal inherent in data, that using a statistical measure more faithfully preserves this key characteristic across both multi-dimensional projections and multi-resolution representations than a methodology based upon averaging.

  3. Root cause analysis for waste area grouping 1, Batch I, Series 1 Tank T-30 project at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1996-08-01

    Four inactive liquid low-level waste (LLLW) tanks were scheduled for remedial actions as the Batch L Series I Tank Project during fiscal year (FY) 1995. These tanks are 3001-B, 3004-B, T-30, and 3013. The initial tank remediation project was conducted as a maintenance action. One project objective was to gain experience in remediation efforts (under maintenance actions) to assist in conducting remedial action projects for the 33 remaining inactive LLLW tanks. Batch I, Series 1 project activities resulted in the successful remediation of tanks 3001-B, 3004-B, and 3013. Tank T-30 remedial actions were halted as a result of information obtained during waste characterization activities. The conditions discovered on tank T-30 would not allow completion of tank removal and smelting as originally planned. A decision was made to conduct a root cause analysis of Tank T-30 events to identify and, where possible, correct weaknesses that, if uncorrected, could result in similar delays for completion of future inactive tank remediation projects. The objective of the analysis was to determine why a portion of expected project end results for Tank T-30 were not fully achieved. The root cause analysis evaluates project events and recommends beneficial improvements for application to future projects. This report presents the results of the Batch I, Series root cause analysis results and makes recommendations based on that analysis

  4. Toward a Stakeholder Perspective on Social Stability Risk of Large Hydraulic Engineering Projects in China: A Social Network Analysis

    Directory of Open Access Journals (Sweden)

    Zhengqi He

    2018-04-01

    Full Text Available In China, large hydraulic engineering projects have made a great contribution to social economic development; at the same time, they also lead to social risks that affect social stability. The pluralism of stakeholders in large hydraulic engineering projects and the complex interrelationship among stakeholders are the important factors affecting social stability risk. Previous studies of social stability risk have mainly focused on risk identification and risk assessment, without considering the relationships among stakeholders and their linkages of risks. For large hydraulic engineering projects, this paper investigated the relevant risk factors and their interrelationships through a literature review and interviews that represented stakeholder perspectives. The key social stability risk factors were identified based on social network analysis. A multi-channel project financial system, a perfect interest compensation mechanism, an efficient prevention mechanism of group events, and a complete project schedule control system were proposed to mitigate the social stability risks. This study combined stakeholder management with risk management by using social network analysis, providing reference for the social stability risk management of large engineering projects in China.

  5. NASA Subsonic Rotary Wing Project-Multidisciplinary Analysis and Technology Development: Overview

    Science.gov (United States)

    Yamauchi, Gloria K.

    2009-01-01

    This slide presentation reviews the objectives of the Multidisciplinary Analysis and Technology Development (MDATD) in the Subsonic Rotary Wing project. The objectives are to integrate technologies and analyses to enable advanced rotorcraft and provide a roadmap to guide Level 1 and 2 research. The MDATD objectives will be met by conducting assessments of advanced technology benefits, developing new or enhanced design tools, and integrating Level 2 discipline technologies to develop and enable system-level analyses and demonstrations.

  6. African monsoon multidisciplinary analysis - An international research project and field campaign

    OpenAIRE

    Redelsperger, J. L.; Thorncroft, C. D.; Diedhiou, Arona; Lebel, Thierry; Parker, D. J.; Polcher, J.

    2006-01-01

    African Monsoon Multidisciplinary Analysis (AMMA) is an international project to improve our knowledge and understanding of the West African monsoon (WAM) and its variability with an emphasis on daily-to-interannual time scales. AMMA is motivated by an interest in fundamental scientific issues and by the societal need for improved prediction of the WAM and its impacts on West African nations. Recognizing the societal need to develop strategies that reduce the socioeconomic impacts of the vari...

  7. QR Codes in the Library: Are They Worth the Effort? Analysis of a QR Code Pilot Project

    OpenAIRE

    Wilson, Andrew M.

    2012-01-01

    The literature is filled with potential uses for Quick Response (QR) codes in the library. Setting, but few library QR code projects have publicized usage statistics. A pilot project carried out in the Eda Kuhn Loeb Music Library of the Harvard College Library sought to determine whether library patrons actually understand and use QR codes. Results and analysis of the pilot project are provided, attempting to answer the question as to whether QR codes are worth the effort for libraries.

  8. ASEAN projects reviewed.

    Science.gov (United States)

    1980-01-01

    The ASEAN Population Expert Group met in Manila and was followed by a meeting of the ASEAN heads of population programs, during the period November 5-10, 1979. Heads of population programs from Indonesia, Malaysia, Singapore, Thailand, and the Philippines attended. The meetings were held to review progress-to-date on phase 1 projects and to consider the development of an expanded population program. 5 projects funded by UNFPA are reviewed in tabular form with the project, the sponsoring country, date of implementation, data analysis, and date of completion. Suggestions were made for improving and extending these projects and it was also suggested that all projects being developed and proposed should include a section on use of research. 7 new projects were proposed as phase 2 projects. The 1st, sponsored by Malaysia, deals with women in development; project 2, lead by Thailand, will investigate population movement and its effect on development; project 3, led by the Philippines, will develop and strengthen national population information systems and networks in ASEAN countries; project 4, led by Indonesia, is directed towards institutional development and exchanges of personnel; project 5, led by the Philippines, will examine population and development dynamics and the man/resources balance; project 6, led by Thailand, will develop ASEAN social indicators; and project 7, led by Indonesia and Malaysia, will make a comprehensive analysis of existing medical/health care and family planning systems. It was recommended that an executive director of the proposed ASEAN population coordination unit should be appointed to expedite the recommendations of the meeting related to preparation and submission of phase 2 project proposals.

  9. Supplement to the UMTRA Project water sampling and analysis plan, Monument Valley, Arizona

    International Nuclear Information System (INIS)

    1995-09-01

    This water sampling and analysis plan (WSAP) supplement supports the regulatory and technical basis for water sampling at the Riverton, Wyoming, Uranium Mill Tailings Remedial Action (UMTRA) Project site, as defined in the 1994 WSAP document for Riverton (DOE, 1994). Further, the supplement serves to confirm the Project's present understanding of the site relative to the hydrogeology and contaminant distribution as well as the intent to continue to use the sampling strategy as presented in the 1994 WSAP document for Riverton. Ground water and surface water monitoring activities are derived from the US Environmental Protection Agency regulations in 40 CFR Part 192 and 60 FR 2854. Sampling procedures are guided by the UMTRA Project standard operating procedures (JEG, n.d.), the Technical Approach Document (DOE, 1989), and the most effective technical approach for the site. Additional site-specific documents relevant to the Riverton site are the Riverton Baseline Risk Assessment (BLRA) (DOE, 1995a) and the Riverton Site Observational Work Plan (SOWP) (DOE, 1995b)

  10. Economic Analysis of Cikaso Mini Hydro Power Plant as a CDM Project for Increasing IRR

    Directory of Open Access Journals (Sweden)

    Irhan Febijanto

    2013-12-01

    Full Text Available Renewable energy fueled power generations are few developed by private sector in Indonesia. High-cost investment and low electricity selling price to PT PLN as a single buyer is main barriers for private sector to involve in the development of renewable energy fueled power generations. In this project, the economic feasibility of Mini Hydro Power Plant of Cikaso with capacity of 5.3 MW, located at Sukabumi Regency, West Java province was assessed. This project utilized revenue generated from carbon market to increase the economic feasibility. Procedure to register the project to United Nation for Climate Change Convention (UNFCCC as a Clean Development Mechanism project was explained in detail. Approved Consolidation Methodology (ACM 0002 Version 12.3.0 was used to calculate grid emission factor in Jawa-Bali-Madura the grid electricity system. It was calculated that the grid emission factor is 0.833 (t-CO2/MWh, and the carbon emission reduction generated for this project is 21,982 ton/year. From the analysis result, it can be proven that the additional revenue from carbon credit could increase the project IRR from 10.28% to 13.52%.

  11. MATCHING CONFIGURATIONS PROJECTS OF COOPERATIVE MILK COLLECTION PROJECT ENVIRONMENT

    Directory of Open Access Journals (Sweden)

    Анатолій Миколайович ТРИГУБА

    2017-03-01

    Full Text Available The condition analysis of dairy farming is done and the reasons for its degradation are revealed. The need of technologically integrated production systems projects, harvesting, and processing of milk are substantiated. A scientific methodology and the method of project design of milk provision cooperative coordination in the community of the project environment, which are based on systematic-evaluative approach and simulation are proposed. The criterion for the definition of rational parameters of objects configuration for milk provision cooperative projects in the community system is the maximum value of their product. The monetary functioning assessment of the configuration object of cooperative milk provision projects in the community is done. On the basis of the proposed method, we performed the coordination of project configuration of milk provision cooperative with the project environment of territory Zabolotsi community in Brody district of Lviv region.

  12. Integrated analysis of the N2 and C O2 projects at the PETROBRAS/E and P - Bahia State -Brazil

    International Nuclear Information System (INIS)

    Rabinovitz, Andre; Ferreira, Luiz Eraldo A.; Rocha, Paulo Sergio; Silva, Gilberto Neto da; Campozana, Fernando P.

    2000-01-01

    After considering that N 2 obtained from flue gas with the use of the separated CO 2 rich current is the best economical alternative for the replacement of natural gas injection for some Reconcavo Basin oil fields and the huge potential for miscible flooding projects at that area, PETROBRAS/E and P-Ba decided to perform an integrated analysis of their N 2 and CO 2 projects in order to maximize their results. Candeias and Agua Grande fields are the main targets for natural gas substitution. They will consume 400 and 700 Mm 3 /d and will make available 80 and 140 ton/d of CO 2 , respectively, to be used in miscible flooding projects. These projects will increase the natural gas availability for the fast growing market at Bahia state and produce up to 220 m 3 /d of oil with an increase of 6.7 % in the ultimate recovery of Santiago/Block 3 reservoir at Miranga field. The integrated analysis took in account all the facilities, works, and services necessary to implement the projects including: separation of the currents from the flue gas, pipelines, compressors, N 2 separation from the produced gas, and workovers. Besides, it was also considered the impact of these projects on the operational costs of those fields and the possibility of using the contaminated gas for future WAG projects. This paper presents the premises, the alternatives and the economical results obtained from the integrated analysis of the PETROBRAS/E and P-Bahia State, Brazil, N 2 and CO 2 projects. (author)

  13. Madagascar: open-source software project for multidimensional data analysis and reproducible computational experiments

    Directory of Open Access Journals (Sweden)

    Sergey Fomel

    2013-11-01

    Full Text Available The Madagascar software package is designed for analysis of large-scale multidimensional data, such as those occurring in exploration geophysics. Madagascar provides a framework for reproducible research. By “reproducible research” we refer to the discipline of attaching software codes and data to computational results reported in publications. The package contains a collection of (a computational modules, (b data-processing scripts, and (c research papers. Madagascar is distributed on SourceForge under a GPL v2 license https://sourceforge.net/projects/rsf/. By October 2013, more than 70 people from different organizations around the world have contributed to the project, with increasing year-to-year activity. The Madagascar website is http://www.ahay.org/.

  14. Does risk management contribute to IT project success? A meta-analysis of empirical evidence

    NARCIS (Netherlands)

    de Bakker, K.F.C.; Boonstra, A.; Wortmann, J.C.

    The question whether risk management contributes to IT project success is considered relevant by people from both academic and practitioners' communities already for a long time. This paper presents a meta-analysis of the empirical evidence that either supports or opposes the claim that risk

  15. Project 2010 For Dummies

    CERN Document Server

    Muir, Nancy C

    2010-01-01

    A friendly reference guide to Microsoft Project, the leading enterprise project management software. As project management software, Microsoft Project allows you to oversee your business activities effectively. You can manage resources, share project info, perform modeling and scenario analysis, and standardize reporting processes. This easy-to-understand guide is completely updated to cover the latest changes and newest enhancements to Project 2010 and shows you how to get Project 2010 to work for you. After an introduction to basic project management concepts, you'll discover the mechanics o

  16. Pre-feasibility analysis of a project for a rational refrigeration of shrimp at Mozambique

    International Nuclear Information System (INIS)

    Ventura Mondlane, Mario; José Antonio Echeverría.La Habana (Cuba))" data-affiliation=" (Grupo Combustibles alternativos. UTH José Antonio Echeverría.La Habana (Cuba))" >Rodríguez Ramos, Pedro A.; José Antonio Echeverría.La Habana (Cuba))" data-affiliation=" (CETER. UTH José Antonio Echeverría.La Habana (Cuba))" >Ferras Valcárce, Antonio

    2017-01-01

    The aim of this work is to analyze the economic feasibility of a project for increasing shrimp refrigerated installation efficiency in Mozambique. The following contents are presented: determination of the volume of shrimp to be refrigerate from the annual capture in the main fishing industries at Mozambique; determination of the design conditions of the refrigeration rooms in order to find the proper temperature conditions and relative humidity for shrimp conservation; estimation of thermal load of the refrigeration plant based on three chambers of equal volume and with different conservation temperatures. Finally, a pre-feasibility analysis of the project is assessed. (author)

  17. Innovative Project Activities in Science [From the NSTA Study of Innovative Project Activities

    Science.gov (United States)

    Science Teacher, 1975

    1975-01-01

    Describes four projects chosen as innovative project activities in science which exhibited identification of unique or novel problems and creative approaches to their solutions. Projects included a study of fish in Lake Erie, a goat raising project, an analysis of terrestrial plant ecology and soil composition, and a study of marine and wetlands…

  18. Fluorescence In Situ Hybridization (FISH Signal Analysis Using Automated Generated Projection Images

    Directory of Open Access Journals (Sweden)

    Xingwei Wang

    2012-01-01

    Full Text Available Fluorescence in situ hybridization (FISH tests provide promising molecular imaging biomarkers to more accurately and reliably detect and diagnose cancers and genetic disorders. Since current manual FISH signal analysis is low-efficient and inconsistent, which limits its clinical utility, developing automated FISH image scanning systems and computer-aided detection (CAD schemes has been attracting research interests. To acquire high-resolution FISH images in a multi-spectral scanning mode, a huge amount of image data with the stack of the multiple three-dimensional (3-D image slices is generated from a single specimen. Automated preprocessing these scanned images to eliminate the non-useful and redundant data is important to make the automated FISH tests acceptable in clinical applications. In this study, a dual-detector fluorescence image scanning system was applied to scan four specimen slides with FISH-probed chromosome X. A CAD scheme was developed to detect analyzable interphase cells and map the multiple imaging slices recorded FISH-probed signals into the 2-D projection images. CAD scheme was then applied to each projection image to detect analyzable interphase cells using an adaptive multiple-threshold algorithm, identify FISH-probed signals using a top-hat transform, and compute the ratios between the normal and abnormal cells. To assess CAD performance, the FISH-probed signals were also independently visually detected by an observer. The Kappa coefficients for agreement between CAD and observer ranged from 0.69 to 1.0 in detecting/counting FISH signal spots in four testing samples. The study demonstrated the feasibility of automated FISH signal analysis that applying a CAD scheme to the automated generated 2-D projection images.

  19. HANFORD DOUBLE SHELL TANK THERMAL AND SEISMIC PROJECT SEISMIC ANALYSIS OF HANFORD DOUBLE SHELL TANKS

    Energy Technology Data Exchange (ETDEWEB)

    MACKEY TC; RINKER MW; CARPENTER BG; HENDRIX C; ABATT FG

    2009-01-15

    M&D Professional Services, Inc. (M&D) is under subcontract to Pacific Northwest National Laboratories (PNNL) to perform seismic analysis of the Hanford Site Double-Shell Tanks (DSTs) in support of a project entitled Double-Shell Tank (DST) Integrity Project - DST Thermal and Seismic Analyses. The original scope of the project was to complete an up-to-date comprehensive analysis of record of the DST System at Hanford in support of Tri-Party Agreement Milestone M-48-14. The work described herein was performed in support of the seismic analysis of the DSTs. The thermal and operating loads analysis of the DSTs is documented in Rinker et al. (2004). Although Milestone M-48-14 has been met, Revision I is being issued to address external review comments with emphasis on changes in the modeling of anchor bolts connecting the concrete dome and the steel primary tank. The work statement provided to M&D (PNNL 2003) required that a nonlinear soil structure interaction (SSI) analysis be performed on the DSTs. The analysis is required to include the effects of sliding interfaces and fluid sloshing (fluid-structure interaction). SSI analysis has traditionally been treated by frequency domain computer codes such as SHAKE (Schnabel, et al. 1972) and SASSI (Lysmer et al. 1999a). Such frequency domain programs are limited to the analysis of linear systems. Because of the contact surfaces, the response of the DSTs to a seismic event is inherently nonlinear and consequently outside the range of applicability of the linear frequency domain programs. That is, the nonlinear response of the DSTs to seismic excitation requires the use of a time domain code. The capabilities and limitations of the commercial time domain codes ANSYS{reg_sign} and MSC Dytran{reg_sign} for performing seismic SSI analysis of the DSTs and the methodology required to perform the detailed seismic analysis of the DSTs has been addressed in Rinker et al (2006a). On the basis of the results reported in Rinker et al

  20. Realizing energy infrastructure projects – A qualitative empirical analysis of local practices to address social acceptance

    International Nuclear Information System (INIS)

    Friedl, Christina; Reichl, Johannes

    2016-01-01

    The federal state of Upper Austria, at a crossing point for European energy grids, provides large-scale resources for storage of natural gas and is among the top infrastructures in this regard in Europe. Considering the ambitious plans for enhancements of energy infrastructures in this region, the issue of social acceptance of energy infrastructure is crucial. To foster an understanding of the challenges inherent in this issue we present an analysis concentrating on the social acceptance of energy infrastructure projects in Upper Austria. This paper addresses the issues with realizing energy infrastructure projects and analyzes the problems and benefits based on an empirical–qualitative study comprising expert interviews, discussions with stakeholders, and a round table workshop integrating the disparate viewpoints. The aim of the process was to integrate different attitudes, perspectives and positions of relevant stakeholders, members of citizens’ initiatives, environmental organizations and of the national government and local authorities. The results presented are based on both the analysis of the empirical–qualitative data and the existing studies and literature on social acceptance. The qualitative research compares experiences and current practices with social acceptance issues (like frameworks, participation, communication strategies) in a set of considered energy infrastructure projects. - Highlights: • Relates evidence of the effects of local resistance to Upper Austrian infrastructure projects. • We use a qualitative analysis to gain a holistic understanding of the social acceptance issue. • Acceptance is hampered by political, legal, institutional and procedural frameworks. • The issues of participation and communication play a key role.

  1. Understanding lean & safety projects: analysis of case studies

    Directory of Open Access Journals (Sweden)

    Maria Crema

    2017-12-01

    Full Text Available Facing the current socio-economic contingency while guaranteeing a high level of care quality is particularly challenging in the field of healthcare. Through an integrated adoption of emerging managerial solutions, projects that allow organizations to achieve both efficiency and patient safety improvements could be implemented, thereby transposing policy directives towards a safer and more sustainable healthcare system. Therefore, the purpose of this paper is to investigate the features of Lean & Safety (L&S projects. Three Health Lean Management (HLM projects that had unexpected patient safety results were selected from the same region. Differences and similarities among the cases have been highlighted and interesting points of evidence have been noted. Despite the fact that the projects were pursuing similar objectives and benefiting from comparable support, the obtained changes had direct impact on patient safety enhancement in the cases that involved the front-office processes, and an indirect impact on patient safely for the L&S project that focused on back-office activities. The implementation processes and the Information and Communication Technologies (ICT adoption of the cases are also different.

  2. Fuzzy decision analysis for project scope change management

    OpenAIRE

    Farshad Shirazi; Hamed Kazemipoor; Reza Tavakkoli-Moghaddam

    2017-01-01

    It is very important to manage and control projects with the consideration of the triple constraints; namely time, cost and scope. It is also extremely important to manage the scope and all the procurements needed to complete any project. During the project’s lifecycle many changes take place, either positively or negatively, which should be controlled. If the changes are not controlled we may have scope creep that has negative effect on the project. It is commonly considered a negative incid...

  3. Factors influencing the societal acceptance of new energy technologies. Meta-analysis of recent European projects

    Energy Technology Data Exchange (ETDEWEB)

    Poti, B.; Difiore, M. [Consiglio Nazionale delle Ricerche, Rome (Italy); Brohmann, B.; Daniels, A.; Fritsche, U.; Huenecke, K. [Oeko-Institut, Darmstadt (Germany); Heiskanen, E. [National Consumer Research Centre, Helsinki (Finland); Raven, R.P.J.M.; Mourik, R.; Feenstra, C.F.J.; Willemse, R. [ECN Policy Studies, Petten (Netherlands); Hodson, M. [Centre for Sustainable Urban and Regional Futures SURF, University of Salford, Manchester (United Kingdom); Alcantud Torrent, A.; Schaefer, B. [Ecoinstitut Barcelona, Barcelona (Spain); Farkas, B.; Fucsko, J. [Hungarian Environmental Economics Centre MAKK, Budapest (Hungary); Jolivet, E. [IAE Toulouse, Toulouse (France); Maack, M.H.; Matschoss, K. [Icelandic New Energy INE, Reykjavik (Iceland); Oniszk-Poplawska, A. [Institute for Renewable Energy IEO, Warszawa (Poland); Prasad, G. [Energy Research Centre ERC, University of Cape Town, Cape Town (South Africa)

    2008-03-15

    Within this report an analysis is made of 27 case studies of historical and recent new energy technologies in different European regions and South Africa. The analysis focuses on the societal acceptance in these projects in order to identify determinants of success and failure. A wide diversity of technologies is discussed including hydrogen, CO2 capture and storage, biomass, solar and wind energy technologies.

  4. Speciation analysis of radionuclides in the environment - NSK-B SPECIATION project report 2009

    International Nuclear Information System (INIS)

    Hou, X.; Aldahan, A.; Possnert, G.; Lujaniene, G.; Lehto, J.; Skipperud, L.; Lind, O.C.; Salbu, B.

    2009-10-01

    The second stage of the NKS-B project SPECIATION was complemented in 2008-2009, which mainly focus on three aspects: (1) Further improvement and development of methods for speciation analysis of radionuclides; (2) Investigation of speciation of some radionuclides in the environment (water, sediments, particles); and (3) Intercomparison excise for speciation analysis of radionuclides in soil and sediment. This report summarizes the work completed in the project partners' laboratories. Method developments include: Development of an rapid and in-suit separation method for the speciation analysis of 129I in seawater samples; Development of a simple method for the speciation analysis of 129I in fresh water and seawater samples; Development of an on-line HPLC-ICP-MS method for the direct speciation analysis of 127I in water and leachate samples; Speciation of radionuclides in water includes: Speciation of 129I and 127I in time-series precipitation samples collected in Denmark 2001-2006 and its application for the investigation of geochemistry and atmospheric chemistry of iodine, Speciation of radionuclides in Ob and Yenisey Rivers, and Speciation of 129I and 127I in Lake Heimdalen water. Speciation of radionuclides in soils and sediments includes: Sequential extraction of radionuclides in sediments and of trace elements in soil samples. Sequential extraction of radionuclides in aerosols and particles has also been performed. Furthermore, sorption experiments have been performed to investigate the association of Pu, Am and Cs with different geological materials. The intercomparison exercises included sequential extraction of Pu, 137Cs, U, Th, and 129I in one soil and one sediment standard reference materials (NIST-4354, IAEA-375) and Pu in sediment collected from the Lake Heimdalen, Norway. (author)

  5. Speciation analysis of radionuclides in the environment - NSK-B SPECIATION project report 2009

    Energy Technology Data Exchange (ETDEWEB)

    Hou, X. (Technical Univ. of Denmark, Risoe National Lab. for Sustainable Energy, Roskilde (Denmark)); Aldahan, A. (Uppsala Univ., Dept. of Earth Science (Sweden)); Possnert, G. (Uppsala Univ., Tandem Lab. (Sweden)); Lujaniene, G. (Univ. of Helsinki, Lab. of Radiochemistry (Finland)); Lehto, J. (Institute of Physics (Lithuania)); Skipperud, L.; Lind, O.C.; Salbu, B. (Norwegian Univ. of Life Sciences, Isotope Lab., AAs (Norway))

    2009-10-15

    The second stage of the NKS-B project SPECIATION was complemented in 2008-2009, which mainly focus on three aspects: (1) Further improvement and development of methods for speciation analysis of radionuclides; (2) Investigation of speciation of some radionuclides in the environment (water, sediments, particles); and (3) Intercomparison excise for speciation analysis of radionuclides in soil and sediment. This report summarizes the work completed in the project partners' laboratories. Method developments include: Development of an rapid and in-suit separation method for the speciation analysis of 129I in seawater samples; Development of a simple method for the speciation analysis of 129I in fresh water and seawater samples; Development of an on-line HPLC-ICP-MS method for the direct speciation analysis of 127I in water and leachate samples; Speciation of radionuclides in water includes: Speciation of 129I and 127I in time-series precipitation samples collected in Denmark 2001-2006 and its application for the investigation of geochemistry and atmospheric chemistry of iodine, Speciation of radionuclides in Ob and Yenisey Rivers, and Speciation of 129I and 127I in Lake Heimdalen water. Speciation of radionuclides in soils and sediments includes: Sequential extraction of radionuclides in sediments and of trace elements in soil samples. Sequential extraction of radionuclides in aerosols and particles has also been performed. Furthermore, sorption experiments have been performed to investigate the association of Pu, Am and Cs with different geological materials. The intercomparison exercises included sequential extraction of Pu, 137Cs, U, Th, and 129I in one soil and one sediment standard reference materials (NIST-4354, IAEA-375) and Pu in sediment collected from the Lake Heimdalen, Norway. (author)

  6. Waste management project technical baseline description

    International Nuclear Information System (INIS)

    Sederburg, J.P.

    1997-01-01

    A systems engineering approach has been taken to describe the technical baseline under which the Waste Management Project is currently operating. The document contains a mission analysis, function analysis, requirement analysis, interface definitions, alternative analysis, system definition, documentation requirements, implementation definitions, and discussion of uncertainties facing the Project

  7. Overview of ACTYS project on development of indigenous state-of-the-art code suites for nuclear activation analysis

    International Nuclear Information System (INIS)

    Subhash, P.V.; Tadepalli, Sai Chaitanya; Deshpande, Shishir P.; Kanth, Priti; Srinivasan, R.

    2017-01-01

    Rigorous activation calculations are warranted for safer and efficient design of future fusion machines. Suitable activation codes, which yield accurate results with faster performance yet include all fusion relevant reactions are a prerequisite. To meet these, an indigenous project called ACTYS-Project is initiated and as a result, four state-of-art codes are developed so far. The goal of this project is to develop indigenous state-of-the-art code suites for nuclear activation analysis

  8. Review of US ESCO industry market trends: an empirical analysis of project data

    International Nuclear Information System (INIS)

    Goldman, Charles A.; Hopper, Nicole C.; Osborn, Julie G.

    2005-01-01

    This comprehensive empirical analysis of US energy service company (ESCO) industry trends and performance employs two parallel analytical approaches: a survey of firms to estimate total industry size, and a database of ∼1500 ESCO projects, from which we report target markets and typical project characteristics, energy savings and customer economics. We estimate that industry investment for energy-efficiency related services reached US$2 billion in 2000 following a decade of strong growth. ESCO activity is concentrated in states with high economic activity and strong policy support. Typical projects save 150-200 MJ/m 2 /year and are cost-effective with median benefit/cost ratios of 1.6 and 2.1 for institutional and private sector projects. The median simple payback time (SPT) is 7 years among institutional customers; 3 years is typical in the private sector. Reliance on DSM incentives has decreased since 1995. Preliminary evidence suggests that state enabling policies have boosted the industry in medium-sized states. ESCOs have proven resilient in the face of restructuring and will probably shift toward selling 'energy solutions', with energy efficiency part of a package. We conclude that appropriate policy support - both financial and non-financial - can 'jump-start' a viable private-sector energy-efficiency services industry that targets large institutional and commercial/industrial customers

  9. Review of US ESCO industry market trends: an empirical analysis of project data

    International Nuclear Information System (INIS)

    Goldman, C.A.; Hopper, N.C.; Osborn, J.G.

    2005-01-01

    This comprehensive empirical analysis of US energy service company (ESCO) industry trends and performance employs two parallel analytical approaches: a survey of firms to estimate total industry size, and a database of ∼1500 ESCO projects, from which we report target markets and typical project characteristics, energy savings and customer economics. We estimate that industry investment for energy-efficiency related services reached US$2 billion in 2000 following a decade of strong growth. ESCO activity is concentrated in states with high economic activity and strong policy support. Typical projects save 150-200 MJ/m 2 /year and are cost-effective with median benefit/cost ratios of 1.6 and 2.1 for institutional and private sector projects. The median simple payback time (SPT) is 7 years among institutional customers; 3 years is typical in the private sector. Reliance on DSM incentives has decreased since 1995. Preliminary evidence suggests that state enabling policies have boosted the industry in medium-sized states. ECSOs have proven resilient in the face of restructuring and will probably shift toward selling 'energy solutions', with energy efficiency part of a package. We conclude that appropriate policy support - both financial and non-financial - can 'jump-start' a viable private-sector energy-efficiency services industry that targets large institutional and commercial/industrial customers. (author)

  10. Speciation Analysis of Radionuclides in the Environment - NSK-B SPECIATION project report 2009

    DEFF Research Database (Denmark)

    Hou, Xiaolin; Aldahan, Ala; Possnert, Göran

    . Speciation of radionuclides in soils and sediments includes: Sequential extraction of radionuclides in sediments and of trace elements in soil samples. Sequential extraction of radionuclides in aerosols and particles has also been performed. Further-more, sorption experiments have been performed......, sediments, particles); and (3) Intercomparison excise for speciation analysis of radionu-clides in soil and sediment. This report summarizes the work completed in the project partners’ laboratories, Method developments include: Development of an rapid and in-suit separation method for the speciation...... analysis of 129I in seawater samples; Development of a simple method for the speciation analysis of 129I in fresh water and seawater samples; Development of an on-line HPLC-ICP-MS method for the direct speciation analysis of 127I in water and leachate samples; Speciation of radionuclides in water includes...

  11. Decommissioning wind energy projects: An economic and political analysis

    International Nuclear Information System (INIS)

    Ferrell, Shannon L.; DeVuyst, Eric A.

    2013-01-01

    Wind energy is the fastest-growing segment of new electrical power capacity in the United States, with the potential for significant growth in the future. To facilitate such growth, a number of concerns between developers and landowners must be resolved, including assurance of wind turbine decommissioning at the end of their useful lives. Oklahoma legislators enlisted the authors to develop an economically-sound proposal to ensure developers complete their decommissioning obligations. Economic analysis of turbine decommissioning is complicated by a lack of operational experience, as few U.S. projects have been decommissioned. This leads to a lack of data regarding decommissioning costs. Politically, the negotiation leading to the finally-enacted solution juxtaposed economic theory against political pragmatism, leading to a different but hopefully sound solution. This article will provide background for the decommissioning issue, chronicle the development of the decommissioning component of the Oklahoma Wind Energy Act, and frame issues that remain for policymakers in regulating wind power development. - Highlights: ► Wind energy is the fastest-growing component of U.S. power generation. ► Decommissioning wind projects is policy concern for wind development. ► Little public information on wind turbine decommissioning costs exists. ► Oklahoma’s solution attempts to account for both costs and risks. ► Additional research is needed to create a more precise policy solution.

  12. Supplement analysis 2 of environmental impacts resulting from modifications in the West Valley Demonstration Project

    International Nuclear Information System (INIS)

    1998-01-01

    The West Valley Demonstration Project, located in western New York, has approximately 600,000 gallons of liquid high-level radioactive waste (HLW) in storage in underground tanks. While corrosion analysis has revealed that only limited tank degradation has taken place, the failure of these tanks could release HLW to the environment. Congress requires DOE to demonstrate the technology for removal and solidification of HLW. DOE issued the Final Environmental Impact Statement (FEIS) in 1982. The purpose of this second supplement analysis is to re-assess the 1982 Final Environmental Impact Statement's continued adequacy. This report provides the necessary and appropriate data for DOE to determine whether the environmental impacts presented by the ongoing refinements in the design, process, and operations of the Project are considered sufficiently bounded within the envelope of impacts presented in the FEIS and supporting documentation

  13. PRATIQUE: a research project to enhance pest risk analysis techniques in the European Union

    NARCIS (Netherlands)

    Baker, R.H.A.; Battisti, A.; Bremmer, J.; Kenis, M.; Mumford, J.; Petter, F.; Schrader, G.; Bacher, S.; DeBarro, P.; Hulme, P.E.; Karadjova, O.; Oude Lansink, A.; Pruvost, O.; Pysek, P.; Roques, A.; Baranchikov, Y.; Sun, J.H.

    2009-01-01

    PRATIQUE is an EC-funded 7th Framework research project designed to address the major challenges for pest risk analysis (PRA) in Europe. It has three principal objectives: (a) to assemble the datasets required to construct PRAs valid for the whole of the EU, (b) to conduct multi-disciplinary

  14. Analysis of renewable energy projects' implementation in Russia

    Science.gov (United States)

    Ratner, S. V.; Nizhegorodtsev, R. M.

    2017-06-01

    With the enactment in 2013 of a renewable energy scheme by contracting qualified power generation facilities working on renewable energy sources (RES), the process of construction and connection of such facilities to the Federal Grid Company has intensified in Russia. In 2013-2015, 93 projects of solar, wind, and small hydropower energy were selected on the basis of competitive bidding in the country with the purpose of subsequent support. Despite some technical and organizational problems and a time delay of some RES projects, in 2014-2015 five solar generating facilities with total capacity of 50 MW were commissioned, including 30 MW in Orenburg oblast. However, the proportion of successful projects is low and amounts to approximately 30% of the total number of announced projects. The purpose of this paper is to analyze the experience of implementation of renewable energy projects that passed through a competitive selection and gained the right to get a partial compensation for the construction and commissioning costs of RES generating facilities in the electric power wholesale market zone. The informational background for the study is corporate reports of project promoters, analytical and information materials of the Association NP Market Council, and legal documents for the development of renewable energy. The methodological base of the study is a theory of learning curves that assumes that cost savings in the production of high-tech products depends on the production growth rate (economy of scale) and gaining manufacturing experience (learning by doing). The study has identified factors that have a positive and a negative impact on the implementation of RES projects. Improvement of promotion measures in the renewable energy development in Russia corresponding to the current socio-economic situation is proposed.

  15. Sensitivity Analysis of Arctic Sea Ice Extent Trends and Statistical Projections Using Satellite Data

    Directory of Open Access Journals (Sweden)

    Ge Peng

    2018-02-01

    Full Text Available An ice-free Arctic summer would have pronounced impacts on global climate, coastal habitats, national security, and the shipping industry. Rapid and accelerated Arctic sea ice loss has placed the reality of an ice-free Arctic summer even closer to the present day. Accurate projection of the first Arctic ice-free summer year is extremely important for business planning and climate change mitigation, but the projection can be affected by many factors. Using an inter-calibrated satellite sea ice product, this article examines the sensitivity of decadal trends of Arctic sea ice extent and statistical projections of the first occurrence of an ice-free Arctic summer. The projection based on the linear trend of the last 20 years of data places the first Arctic ice-free summer year at 2036, 12 years earlier compared to that of the trend over the last 30 years. The results from a sensitivity analysis of six commonly used curve-fitting models show that the projected timings of the first Arctic ice-free summer year tend to be earlier for exponential, Gompertz, quadratic, and linear with lag fittings, and later for linear and log fittings. Projections of the first Arctic ice-free summer year by all six statistical models appear to converge to the 2037 ± 6 timeframe, with a spread of 17 years, and the earliest first ice-free Arctic summer year at 2031.

  16. The Version 2 Global Precipitation Climatology Project (GPCP) Monthly Precipitation Analysis (1979-Present)

    Science.gov (United States)

    Adler, Robert F.; Huffman, George J.; Chang, Alfred; Ferraro, Ralph; Xie, Ping-Ping; Janowiak, John; Rudolf, Bruno; Schneider, Udo; Curtis, Scott; Bolvin, David

    2003-01-01

    The Global Precipitation Climatology Project (GPCP) Version 2 Monthly Precipitation Analysis is described. This globally complete, monthly analysis of surface precipitation at 2.5 degrees x 2.5 degrees latitude-longitude resolution is available from January 1979 to the present. It is a merged analysis that incorporates precipitation estimates from low-orbit-satellite microwave data, geosynchronous-orbit-satellite infrared data, and rain gauge observations. The merging approach utilizes the higher accuracy of the low-orbit microwave observations to calibrate, or adjust, the more frequent geosynchronous infrared observations. The data set is extended back into the premicrowave era (before 1987) by using infrared-only observations calibrated to the microwave-based analysis of the later years. The combined satellite-based product is adjusted by the raingauge analysis. This monthly analysis is the foundation for the GPCP suite of products including those at finer temporal resolution, satellite estimate, and error estimates for each field. The 23-year GPCP climatology is characterized, along with time and space variations of precipitation.

  17. Cost-Benefit Analysis for Investment Decisions: Chapter 16 (Cost-Benefit Analysis of Transportation Projects)

    OpenAIRE

    Glenn Jenkins; Chun-Yan Kuo; Arnold C. Harberger

    2011-01-01

    This chapter will focus on the problems of evaluating transportation projects in the context of the less-developed countries. Emphasis will be placed on highway projects, because these account for the bulk of transport investments in the developing parts of the world. If a project passes a straight financial test, based on the present value of its cash inflows and outflows, projects would only come if this financial NPV were outweighed by the present value of the project’s various externali...

  18. Stakeholder-driven multi-attribute analysis for energy project selection under uncertainty

    International Nuclear Information System (INIS)

    Read, Laura; Madani, Kaveh; Mokhtari, Soroush; Hanks, Catherine

    2017-01-01

    In practice, selecting an energy project for development requires balancing criteria and competing stakeholder priorities to identify the best alternative. Energy source selection can be modeled as multi-criteria decision-maker problems to provide quantitative support to reconcile technical, economic, environmental, social, and political factors with respect to the stakeholders' interests. Decision making among these complex interactions should also account for the uncertainty present in the input data. In response, this work develops a stochastic decision analysis framework to evaluate alternatives by involving stakeholders to identify both quantitative and qualitative selection criteria and performance metrics which carry uncertainties. The developed framework is illustrated using a case study from Fairbanks, Alaska, where decision makers and residents must decide on a new source of energy for heating and electricity. We approach this problem in a five step methodology: (1) engaging experts (role players) to develop criteria of project performance; (2) collecting a range of quantitative and qualitative input information to determine the performance of each proposed solution according to the selected criteria; (3) performing a Monte-Carlo analysis to capture uncertainties given in the inputs; (4) applying multi-criteria decision-making, social choice (voting), and fallback bargaining methods to account for three different levels of cooperation among the stakeholders; and (5) computing an aggregate performance index (API) score for each alternative based on its performance across criteria and cooperation levels. API scores communicate relative performance between alternatives. In this way, our methodology maps uncertainty from the input data to reflect risk in the decision and incorporates varying degrees of cooperation into the analysis to identify an optimal and practical alternative. - Highlights: • We develop an applicable stakeholder-driven framework for

  19. REAL OPTIONS ANALYSIS – ASSESSMENT METHOD OF INVESTMENT PROJECTS IN GREEN ENERGY

    Directory of Open Access Journals (Sweden)

    MAFTEI DANIEL

    2014-10-01

    Full Text Available This article highlights the importance of real options as a evaluation method of investment in green energy. Article consider several theoretical and practical approaches, the analysis based on real options by many authors who have theorized and used this method. Each approach provides a operationalisation through a steps series of specific evaluation. This paper highlights the different views: academics, financiers, managers and facilitates the access to an accurate evaluation decisions of projects.

  20. HANFORD DOUBLE SHELL TANK (DST) THERMAL & SEISMIC PROJECT SEISMIC ANALYSIS IN SUPPORT OF INCREASED LIQUID LEVEL IN 241-AP TANK FARMS

    Energy Technology Data Exchange (ETDEWEB)

    MACKEY TC; ABBOTT FG; CARPENTER BG; RINKER MW

    2007-02-16

    The overall scope of the project is to complete an up-to-date comprehensive analysis of record of the DST System at Hanford. The "Double-Shell Tank (DST) Integrity Project - DST Thermal and Seismic Project" is in support of Tri-Party Agreement Milestone M-48-14.

  1. Environmental problem analysis of the proposed Sage Creek Coal Project in the Flathead Valley of British Columbia

    Energy Technology Data Exchange (ETDEWEB)

    1981-01-01

    The proposed Sage Creek Coal Project is analysed with respect to environmental impacts, international concerns and public concerns. Although information available to date is insufficient to pursue an analysis enabling a determination of the full social and environmental cost of the project, basic concerns and issues have been elucidated. Emphasis is given to the potential adverse effects on existing fish species and on wildlife species, particularly grizzly bear, moose and mountain goat. Because the area affected by the project includes both Canadian and U.S. territory, environmental objectives of the U.S. government for the Upper Flathead Valley ecosystem must also be considered in any future B.C. government decisions. Public opposition to the project from an environmental standpoint is documented. The report concludes the preferred option for a Ministry of Environment position is to recommend the project not proceed.

  2. UMTRA Project water sampling and analysis plan, Salt Lake City, Utah. Revision 1

    International Nuclear Information System (INIS)

    1995-06-01

    This water sampling and analysis plan describes planned, routine ground water sampling activities at the US Department of Energy Uranium Mill Tailings Remedial Action Project site in Salt Lake City, Utah. This plan identifies and justifies sampling locations, analytical parameters, detection limits, and sampling frequencies for routine monitoring of ground water, sediments, and surface waters at monitoring stations on the site

  3. IMAGE CONSTRUCTION TO AUTOMATION OF PROJECTIVE TECHNIQUES FOR PSYCHOPHYSIOLOGICAL ANALYSIS

    Directory of Open Access Journals (Sweden)

    Natalia Pavlova

    2018-04-01

    Full Text Available The search for a solution of automation of the process of assessment of a psychological analysis of the person drawings created by it from an available set of some templates are presented at this article. It will allow to reveal more effectively infringements of persons mentality. In particular, such decision can be used for work with children who possess the developed figurative thinking, but are not yet capable of an accurate statement of the thoughts and experiences. For automation of testing by using a projective method, we construct interactive environment for visualization of compositions of the several images and then analyse

  4. ASEAN-India and ASEAN-Korea FTA: Global Trade Analysis Project

    Directory of Open Access Journals (Sweden)

    Ana Shohibul Manshur Al Ahmad

    2014-04-01

    Full Text Available The aim of this research is to investigate the effects of the free trade agreement between ASEAN-India (AIFTA and ASEAN-Korea (AKFTA. The Computable General Equilibrium (CGE model was applied in this paper with a Global Trade Analysis Project (GTAP database version 8. The GTAP simulations results show that AIFTA provides a greater positive impact than the AKFTA for each region. The greater improvement in terms of welfare, GDP, trade and investment is generated under the AIFTA scheme. Implication of this research is required of any reallocation of resources shared by each country heading on sectors which have a comparative advantage.

  5. Stochastic project networks temporal analysis, scheduling and cost minimization

    CERN Document Server

    Neumann, Klaus

    1990-01-01

    Project planning, scheduling, and control are regularly used in business and the service sector of an economy to accomplish outcomes with limited resources under critical time constraints. To aid in solving these problems, network-based planning methods have been developed that now exist in a wide variety of forms, cf. Elmaghraby (1977) and Moder et al. (1983). The so-called "classical" project networks, which are used in the network techniques CPM and PERT and which represent acyclic weighted directed graphs, are able to describe only projects whose evolution in time is uniquely specified in advance. Here every event of the project is realized exactly once during a single project execution and it is not possible to return to activities previously carried out (that is, no feedback is permitted). Many practical projects, however, do not meet those conditions. Consider, for example, a production process where some parts produced by a machine may be poorly manufactured. If an inspection shows that a part does no...

  6. Assessment of Carbon Emission Reduction for Buildings Projects in Malaysia-A Comparative Analysis

    Directory of Open Access Journals (Sweden)

    Klufallah Mustafa M. A.

    2014-01-01

    Full Text Available The Malaysian construction industry significantly contributes as an empowerment to its development vision of 2020 by reducing 40% of carbon emission. Moreover, this industry accounts as a threat to the environment, not only in terms of consumption of natural resources but also in emitting million tons of carbon emission annually. In fact, Malaysia is categorized the 30th in the world's ranking in carbon emission level. To mitigate the raise of carbon emission level from the buildings construction, several studies identified some of the effective carbon emission assessment tools for construction projects but it is lack of implementation in Malaysia. The green building index (GBI, Malaysian CIB Report has been introduced to assist the construction stakeholders in reducing the level of carbon emission and the impact of buildings on the environment. This paper presents an analysis of carbon emission from housing projects and office buildings in order to identify and quantify the main sources of carbon emission for each project and it proposes environmental friendly materials as replacement for conventional construction materials to achieve the implementation of sustainability in Malaysia.

  7. Student design projects in applied acoustics.

    Science.gov (United States)

    Bös, Joachim; Moritz, Karsten; Skowronek, Adam; Thyes, Christian; Tschesche, Johannes; Hanselka, Holger

    2012-03-01

    This paper describes a series of student projects which are intended to complement theoretical education in acoustics and engineering noise control with practical experience. The projects are also intended to enhance the students' ability to work in a team, to manage a project, and to present their results. The projects are carried out in close cooperation with industrial partners so that the students can get a taste of the professional life of noise control engineers. The organization of such a project, its execution, and some of the results from the most recent student project are presented as a demonstrative example. This latest project involved the creation of noise maps of a production hall, the acoustic analysis of a packaging machine, and the acoustic analysis of a spiral vibratory conveyor. Upon completion of the analysis, students then designed, applied, and verified some simple preliminary noise reduction measures to demonstrate the potential of these techniques. © 2012 Acoustical Society of America

  8. Financial feasibility analysis on small medium reactor nuclear power plant (SMR NPP) project in Indonesia under uncertainty

    International Nuclear Information System (INIS)

    Nuryanti; Suparman; Mochamad Nasrullah; Elok Satiti Amitayani; Wiku Lulus Widodo

    2015-01-01

    NPP SMR is one alternative to overcome the Outside Java Bali region's dependence on diesel power plant. One crucial issue in the NPP project (including SMR) would be financing, associated with the capital-intensive nature of the project. In addition, the SMR NPP project also be vulnerable in occurrence of some uncertainties. Therefore, this study aimed to analyze the financial feasibility of SMR NPP project by accommodating the possibility of the uncertainties. The methodology used is probabilistic analysis which was performed by Monte Carlo technique. This technique simulates the relationship between the uncertainty variables with financial feasibility indicators. The results showed that in probabilistic approach, SMR NPP project is considered feasible on the 'most probable value' of electricity selling price of 15 cents/kWh, indicated by positive average value of NPV (US$ 135,324,004) and the average value of both of IRRs are bigger than MARR (IRR project = 10.65 %, IRR Equity = 14.29 %, while MARR = 10 %). The probability of rejection of the SMR project was about 20 %. The three main variables that are most influential in the project were: selling price of electricity, investment cost and inflation rate. (author)

  9. Understanding new product project performance : A meta-analysis

    NARCIS (Netherlands)

    Commandeur, H.R.; Pattikawa, L.H.; Verwaal, E.

    2006-01-01

    Purpose: The purpose of this paper is to summarize the accumulated body of knowledge on the performance of new product projects and provide directions for further research. Design/methodology/approach: Using a refined classification of antecedents of new product project performance the research

  10. Fuel integrity project: analysis of light water reactor fuel rods test results

    International Nuclear Information System (INIS)

    Dallongeville, M.; Werle, J.; McCreesh, G.

    2004-01-01

    BNFL Nuclear Sciences and Technology Services and COGEMA LOGISTICS started in the year 2000 a joint project known as FIP (Fuel Integrity Project) with the aim of developing realistic methods by which the response of LWR fuel under impact accident conditions could be evaluated. To this end BNFL organised tests on both unirradiated and irradiated fuel pin samples and COGEMA LOGISTICS took responsibility for evaluating the test results. Interpretation of test results included simple mechanical analysis as well as simulation by Finite Element Analysis. The first tests that were available for analysis were an irradiated 3 point bending commissioning trial and a lateral irradiated hull compression test, both simulating the loading during a 9 m lateral regulatory drop. The bending test span corresponded roughly to a fuel pin intergrid distance. The outcome of the test was a failure starting at about 35 mm lateral deflection and a few percent of total deformation. Calculations were carried out using the ANSYS code employing a shell and brick model. The hull lateral compaction test corresponds to a conservative compression by neighbouring pins at the upper end of the fuel pin. In this pin region there are no pellets inside. The cladding broke initially into two and later into four parts, all of which were rather similar. Initial calculations were carried out with LS-DYNA3D models. The models used were optimised in meshing, boundary conditions and material properties. The calculation results compared rather well with the test data, in particular for the detailed ANSYS approach of the 3 point bending test, and allowed good estimations of stresses and deformations under mechanical loading as well as the derivation of material rupture criteria. All this contributed to the development of realistic numerical analysis methods for the evaluation of LWR fuel rod behaviour under both normal and accident transport conditions. This paper describes the results of the 3 point bending

  11. Fuel integrity project: analysis of light water reactor fuel rods test results

    Energy Technology Data Exchange (ETDEWEB)

    Dallongeville, M.; Werle, J. [COGEMA Logistics (AREVA Group) (France); McCreesh, G. [BNFL Nuclear Sciences and Technology Services (United Kingdom)

    2004-07-01

    BNFL Nuclear Sciences and Technology Services and COGEMA LOGISTICS started in the year 2000 a joint project known as FIP (Fuel Integrity Project) with the aim of developing realistic methods by which the response of LWR fuel under impact accident conditions could be evaluated. To this end BNFL organised tests on both unirradiated and irradiated fuel pin samples and COGEMA LOGISTICS took responsibility for evaluating the test results. Interpretation of test results included simple mechanical analysis as well as simulation by Finite Element Analysis. The first tests that were available for analysis were an irradiated 3 point bending commissioning trial and a lateral irradiated hull compression test, both simulating the loading during a 9 m lateral regulatory drop. The bending test span corresponded roughly to a fuel pin intergrid distance. The outcome of the test was a failure starting at about 35 mm lateral deflection and a few percent of total deformation. Calculations were carried out using the ANSYS code employing a shell and brick model. The hull lateral compaction test corresponds to a conservative compression by neighbouring pins at the upper end of the fuel pin. In this pin region there are no pellets inside. The cladding broke initially into two and later into four parts, all of which were rather similar. Initial calculations were carried out with LS-DYNA3D models. The models used were optimised in meshing, boundary conditions and material properties. The calculation results compared rather well with the test data, in particular for the detailed ANSYS approach of the 3 point bending test, and allowed good estimations of stresses and deformations under mechanical loading as well as the derivation of material rupture criteria. All this contributed to the development of realistic numerical analysis methods for the evaluation of LWR fuel rod behaviour under both normal and accident transport conditions. This paper describes the results of the 3 point bending

  12. PROJECT FINANCE AS A TOOL FOR THE IMPLEMENTATION OF INVESTMENT PROJECTS

    Directory of Open Access Journals (Sweden)

    U. V. Vsyakih

    2015-02-01

    Full Text Available The article discusses the reasons for the insufficient use of project financing in the Russian Federation, the brief historical background for the project financing in Russia, as well as the main principles, types and stages of project financing. For results was used theoretical methods associated with the study of general and specialized literature, as well as methods of analysis and synthesis.

  13. Choice of large projects

    Energy Technology Data Exchange (ETDEWEB)

    Harris, R

    1978-08-01

    Conventional cost/benefit or project analysis has generally not taken into account circumstances in which the project under consideration is large enough that its introduction to the economy would have significant general equilibrium effects. In this paper, rules are examined that would indicate whether such large projects should be accepted or rejected. The rules utilize information yielded by before-project and after-project equilibrium prices and production data. Rules are developed for the undistorted ''first-best'' case, the case in which the fixed costs of the project are covered by distortionary taxation, and for the case of projects producing public goods. 34 references.

  14. Support Vector Machines with Manifold Learning and Probabilistic Space Projection for Tourist Expenditure Analysis

    Directory of Open Access Journals (Sweden)

    Xin Xu

    2009-03-01

    Full Text Available The significant economic contributions of the tourism industry in recent years impose an unprecedented force for data mining and machine learning methods to analyze tourism data. The intrinsic problems of raw data in tourism are largely related to the complexity, noise and nonlinearity in the data that may introduce many challenges for the existing data mining techniques such as rough sets and neural networks. In this paper, a novel method using SVM- based classification with two nonlinear feature projection techniques is proposed for tourism data analysis. The first feature projection method is based on ISOMAP (Isometric Feature Mapping, which is a class of manifold learning approaches for dimension reduction. By making use of ISOMAP, part of the noisy data can be identified and the classification accuracy of SVMs can be improved by appropriately discarding the noisy training data. The second feature projection method is a probabilistic space mapping technique for scale transformation. Experimental results on expenditure data of business travelers show that the proposed method can improve prediction performance both in terms of testing accuracy and statistical coincidence. In addition, both of the feature projection methods are helpful to reduce the training time of SVMs.

  15. The residuals analysis project: Evaluating disposal options for treated mixed low-level waste

    International Nuclear Information System (INIS)

    Waters, R.D.; Gruebel, M.M.; Case, J.T.; Letourneau, M.J.

    1997-01-01

    For almost four years, the U.S. Department of Energy (DOE) through its Federal Facility Compliance Act Disposal Workgroup has been working with state regulators and governors' offices to develop an acceptable configuration for disposal of its mixed low-level waste (MLLW). These interactions have resulted in screening the universe of potential disposal sites from 49 to 15 and conducting ''performance evaluations'' for those fifteen sites to estimate their technical capabilities for disposal of MLLW. In the residuals analysis project, we estimated the volume of DOE's MLLW that will require disposal after treatment and the concentrations of radionuclides in the treated waste. We then compared the radionuclide concentrations with the disposal limits determined in the performance evaluation project for each of the fifteen sites. The results are a scoping-level estimate of the required volumetric capacity for MLLW disposal and the identification of waste streams that may pose problems for disposal based on current treatment plans. The analysis provides technical information for continued discussions between the DOE and affected States about disposal of MLLW and systematic input to waste treatment developers on disposal issues

  16. Value of Information Analysis Project Gnome Site, New Mexico

    International Nuclear Information System (INIS)

    Pohll, Greg; Chapman, Jenny

    2010-01-01

    The Project Gnome site in southeastern New Mexico was the location of an underground nuclear detonation in 1961 and a hydrologic tracer test using radionuclides in 1963. The tracer test is recognized as having greater radionuclide migration potential than the nuclear test because the tracer test radionuclides (tritium, 90Sr, 131I, and 137Cs) are in direct contact with the Culebra Dolomite aquifer, whereas the nuclear test is within a bedded salt formation. The tracer test is the topic here. Recognizing previous analyses of the fate of the Gnome tracer test contaminants (Pohll and Pohlmann, 1996; Pohlmann and Andricevic, 1994), and the existence of a large body of relevant investigations and analyses associated with the nearby Waste Isolation Pilot Plant (WIPP) site (summarized in US DOE, 2009), the Gnome Site Characterization Work Plan (U.S. DOE, 2002) called for a Data Decision Analysis to determine whether or not additional characterization data are needed prior to evaluating existing subsurface intrusion restrictions and determining long-term monitoring for the tracer test. Specifically, the Work Plan called for the analysis to weigh the potential reduction in uncertainty from additional data collection against the cost of such field efforts.

  17. Benefit-cost analysis of fishery rehabilitation projects: A Great Lakes case study. Spec. issue: Responses to marine resource change/social sciences perspective

    Science.gov (United States)

    Bishop, R.C.; Milliman, S.R.; Boyle, K.J.; Johnson, B.L.

    1990-01-01

    Tools of benefit-cost analysis are used to evaluate a project to rehabilitate the yellow perch (Perca flavescens ) fishery of Green Bay, Wisconsin. Both sport and commercial fishers harvest from this stock, which has been suffering from much reduced productivity since the early 1960s. The project is composed of commercial quotas and other regulations. Measures of benefits and costs were used that explicitly incorporate uncertainly about the potential level of success of the project. The analysis shows that commercial fish producers will more or less break even compared to where they would have been without the project, but that substantial recreational benefits can be expected.

  18. Student Research Projects

    Science.gov (United States)

    Yeske, Lanny A.

    1998-01-01

    Numerous FY1998 student research projects were sponsored by the Mississippi State University Center for Air Sea Technology. This technical note describes these projects which include research on: (1) Graphical User Interfaces, (2) Master Environmental Library, (3) Database Management Systems, (4) Naval Interactive Data Analysis System, (5) Relocatable Modeling Environment, (6) Tidal Models, (7) Book Inventories, (8) System Analysis, (9) World Wide Web Development, (10) Virtual Data Warehouse, (11) Enterprise Information Explorer, (12) Equipment Inventories, (13) COADS, and (14) JavaScript Technology.

  19. Hydraulic analysis and optimization design in Guri rehabilitation project

    Science.gov (United States)

    Cheng, H.; Zhou, L. J.; Gong, L.; Wang, Z. N.; Wen, Q.; Zhao, Y. Z.; Wang, Y. L.

    2016-11-01

    Recently Dongfang was awarded the contract for rehabilitation of 6 units in Guri power plant, the biggest hydro power project in Venezuela. The rehabilitation includes, but not limited to, the extension of output capacity by about 50% and enhancement of efficiency level. To achieve the targets the runner and the guide vanes will be replaced by the newly optimized designs. In addition, the out-of-date stay vanes with straight plate shape will be modified into proper profiles after considering the application feasibility in field. The runner and vane profiles were optimized by using state-of-the-art flow simulation techniques. And the hydraulic performances were confirmed by the following model tests. This paper describes the flow analysis during the optimization procedure and the comparison between various technical concepts.

  20. Tourism Chains and Pro-Poor Tourism Development: An Actor-Network Analysis of a Pilot Project in Costa Rica

    OpenAIRE

    Duim, van der, V.R.; Caalders, J.D.A.D.

    2008-01-01

    This paper analyses a pilot project in Costa Rica aimed to examine and improve the market linkages of 24 small-scale tourism initiatives to tour operators in Costa Rica and the Netherlands. It links pro-poor tourism and the concept of tourism chain to actor-network theory. The analysis shows that the tangible results in terms of pro-poor tourism of the project itself were meagre, as, initially, only three and later only one out of 24 projects was included in the tourism chain. However, the an...

  1. Overview of the Systems Analysis Framework for the EU Bioeconomy. Deliverable 1.4 of the EU FP 7 SAT-BBE project Systems Analysis Tools Framework for the EU Bio-Based Economy Strategy (SAT BBE)

    NARCIS (Netherlands)

    Leeuwen, van M.G.A.; Meijl, van H.; Smeets, E.M.W.; Tabeau-Kowalska, E.W.

    2014-01-01

    In November 2012 the Systems Analysis Tools Framework for the EU Bio-Based Economy Strategy project (SAT-BBE) was launched with the purpose to design an analysis tool useful to monitoring the evolution and impacts of the bioeconomy. In the SAT-BBE project the development of the analysis tool for the

  2. Macroalgae Analysis A National GIS-based Analysis of Macroalgae Production Potential Summary Report and Project Plan

    Energy Technology Data Exchange (ETDEWEB)

    Roesijadi, Guritno; Coleman, Andre M.; Judd, Chaeli; Van Cleve, Frances B.; Thom, Ronald M.; Buenau, Kate E.; Tagestad, Jerry D.; Wigmosta, Mark S.; Ward, Jeffrey A.

    2011-12-01

    The overall project objective is to conduct a strategic analysis to assess the state of macroalgae as a feedstock for biofuels production. The objective in FY11 is to develop a multi-year systematic national assessment to evaluate the U.S. potential for macroalgae production using a GIS-based assessment tool and biophysical growth model developed as part of these activities. The initial model development for both resource assessment and constraints was completed and applied to the demonstration areas. The model for macroalgal growth was extended to the EEZ off the East and West Coasts of the United States, and a plan to merge the findings for an initial composite assessment was developed. In parallel, an assessment of land-based, port, and offshore infrastructure needs based on published and grey literature was conducted. Major information gaps and challenges encountered during this analysis were identified. Also conducted was an analysis of the type of local, state, and federal requirements that pertain to permitting land-based facilities and nearshore/offshore culture operations

  3. PREPS2 - a PC-based computer program for performing economic analysis of capital projects

    International Nuclear Information System (INIS)

    Blake, M.W.; Brand, D.O.; Chastain, E.T.; Johnson, E.D.

    1990-01-01

    In these times of increased spending to finance new capacity and to meet clean air act legislation, many electric utilities are giving a high priority to controlling capital expenditures at existing generating facilities. Determining the level of capital expenditures which are economically justified is very difficult; units which have higher capacity factors are worth more to the utility. Therefore, the utility can more readily justify higher capital expenditures to improve or maintain reliability and heat rate than on units with lower capacity factors. This paper describes a PC-based computer program (PREPS2) which performs an economic analysis of individual capital projects. The program incorporates tables which describe the worth to the system of making improvements in each unit. This computer program is currently being used by the six Southern Company operating companies to evaluate all production capital projects over $50,000. Approximately 500 projects representing about $300 million are being analyzed each year

  4. Review of US ESCO industry market trends: an empirical analysis of project data

    Energy Technology Data Exchange (ETDEWEB)

    Goldman, C.A.; Hopper, N.C.; Osborn, J.G. [Lawrence Berkeley National Laboratory, Berkeley, CA (United States). Energy Analysis

    2005-02-01

    This comprehensive empirical analysis of US energy service company (ESCO) industry trends and performance employs two parallel analytical approaches: a survey of firms to estimate total industry size, and a database of {approx}1500 ESCO projects, from which we report target markets and typical project characteristics, energy savings and customer economics. We estimate that industry investment for energy-efficiency related services reached US$2 billion in 2000 following a decade of strong growth. ESCO activity is concentrated in states with high economic activity and strong policy support. Typical projects save 150-200 MJ/m{sup 2}/year and are cost-effective with median benefit/cost ratios of 1.6 and 2.1 for institutional and private sector projects. The median simple payback time (SPT) is 7 years among institutional customers; 3 years is typical in the private sector. Reliance on DSM incentives has decreased since 1995. Preliminary evidence suggests that state enabling policies have boosted the industry in medium-sized states. ECSOs have proven resilient in the face of restructuring and will probably shift toward selling 'energy solutions', with energy efficiency part of a package. We conclude that appropriate policy support - both financial and non-financial - can 'jump-start' a viable private-sector energy-efficiency services industry that targets large institutional and commercial/industrial customers. (author)

  5. Coupling analysis on the soft ground settlement laws in Qinshan nuclear power phase I sea wall project

    International Nuclear Information System (INIS)

    Sun Feng; Pan Rong; Zhu Xiuyun; Zhang Dingli

    2011-01-01

    Qinshan Nuclear Power Phase I sea wall project is a barrier engineering in defending the design basis flooding, which is of importance to the safety of NPP. The geological condition has the feature of high compressibility and low penetration, such as the soft ground of 1 + 450 section of Qinshan Nuclear Power Phase I sea wall. Based on parameters acquired from the site experiment, 3-D finite difference analysis is put forward to study the feature of consolidation settlement laws, which can embody the fluid-solid coupling interaction. The conclusions of numerical analysis agree well with the in-site measured data, and it, can contribute to the design and construction of raising sea wall project. (authors)

  6. Statistical Techniques for Project Control

    CERN Document Server

    Badiru, Adedeji B

    2012-01-01

    A project can be simple or complex. In each case, proven project management processes must be followed. In all cases of project management implementation, control must be exercised in order to assure that project objectives are achieved. Statistical Techniques for Project Control seamlessly integrates qualitative and quantitative tools and techniques for project control. It fills the void that exists in the application of statistical techniques to project control. The book begins by defining the fundamentals of project management then explores how to temper quantitative analysis with qualitati

  7. Project, Aerodynamic, Thermal and Ballistic Analysis of a Lifting-Body Reentry Vehicle

    Directory of Open Access Journals (Sweden)

    A. N. Eliseev

    2015-01-01

    Full Text Available The objective of this article is to assess the prospects for an increasingly maneuverable reentry vehicle (RV of class "lifting body". In this regard, a project aerodynamic thermal and ballistic analysis has been conducted and the results have been compared with some well-known projects of the RV of the same class, made both in our country and abroad.The project analysis begins with finding a position of the "lifting body" vehicle in the classification system. Said classification distribution allows correct formulation of requirements for the conceptual structure of an aerospace vehicle at the initial stage of design in terms of system positions, since just the initial phase of the design often determines the success of the whole program.Then the paper compares design characteristics of the RV of class "lifting body" with vehicles such as X-15 rocket plane, the orbiter "Space Shuttle», M2-F2, HL-10, SV-5, and NASP "Hermes". It also gives a comparative estimate of the "lifting body" RV mass in a wide range of dimensions. The paper shows the sustainability of various landing complexes with reference to the Russian experience in developing the RV " Soyuz", and the conditions for using the vehicles of class "lifting body" in space programs.The aerodynamic analysis uses method for the approximate Newtonian theory to calculate aerodynamic characteristics of the perspective RV of class "lifting body" in the hypersonic descent phase. To obtain the desired aerodynamic performance and reduce balancing weight is contemplated a possibility to provide balance by introducing additional boards. The ballistic analysis considers four modes of descent:1. zero roll descent;2. maximum cross-range descent without restriction;3. maximum cross-range descent with restriction of maximum overload and maximum temperature;4. ballistic descent.To calculate the RV ballistic characteristics a system of equations of the vehicle motion in the atmosphere is used. The vehicle

  8. Comparative analysis of structural concrete quality assurance practices on nine nuclear power plant construction projects. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Willenbrock, J.H.; Thomas, H.R. Jr.; Burati, J.L. Jr.

    1978-06-01

    The basic objective of this research effort was to perform a comparative analysis of the Quality Assurance practices related to the structural concrete phase on nine nuclear power plant projects which are (or have been) under construction in the United States in the past ten years. This analysis identified the response of each Quality Assurance program to the applicable criteria of 10 CFR Part 50, Appendix B as well as to the pertinent regulatory requirements and industry standards. The major emphasis was placed on the construction aspects of the structural concrete phase of each project. The engineering and design aspects were examined whenever they interfaced with the construction aspects. For those aspects of the Quality Assurance system which can be considered managerial in nature (i.e., organizational relationships, types of Quality Assurance programs, corrective action procedures, etc.) an attempt has been made to present the alternative approaches that were identified. For those aspects of the Quality Assurance system which are technical in nature (i.e., the frequency of testing for slump, compressive strength, etc.) an attempt has been made to present a comparative analysis between projects and in relation to the recommended or mandated practices presented in the appropriate industry codes and standards.

  9. Comparative analysis of structural concrete quality assurance practices on nine nuclear power plant construction projects. Final report

    International Nuclear Information System (INIS)

    Willenbrock, J.H.; Thomas, H.R. Jr.; Burati, J.L. Jr.

    1978-06-01

    The basic objective of this research effort was to perform a comparative analysis of the Quality Assurance practices related to the structural concrete phase on nine nuclear power plant projects which are (or have been) under construction in the United States in the past ten years. This analysis identified the response of each Quality Assurance program to the applicable criteria of 10 CFR Part 50, Appendix B as well as to the pertinent regulatory requirements and industry standards. The major emphasis was placed on the construction aspects of the structural concrete phase of each project. The engineering and design aspects were examined whenever they interfaced with the construction aspects. For those aspects of the Quality Assurance system which can be considered managerial in nature (i.e., organizational relationships, types of Quality Assurance programs, corrective action procedures, etc.) an attempt has been made to present the alternative approaches that were identified. For those aspects of the Quality Assurance system which are technical in nature (i.e., the frequency of testing for slump, compressive strength, etc.) an attempt has been made to present a comparative analysis between projects and in relation to the recommended or mandated practices presented in the appropriate industry codes and standards

  10. Comparative analysis of structural concrete Quality Assurance practices on nine nuclear and three fossil fuel power plant construction projects. Final summary report

    International Nuclear Information System (INIS)

    Willenbrock, J.H.; Thomas, H.R. Jr.; Burati, J.J. Jr.

    1978-12-01

    A summary of two reports, COO/4120-1 and COO/4120-2, is given. A comparative analysis was made of the Quality Assurance practices related to the structural concrete phase on nine nuclear and three fossil fuel power plant projects which are (or have been) under construction in the United States in the past ten years. For the nuclear projects the analysis identified the response of each Quality Assurance program to the applicable criteria of 10 CFR Part 50, Appendix B as well as to the pertinent regulatory requirements and industry standards. For the fossil projects the analysis identified the response of each Quality Assurance program to criteria similar to those which were applicable in the nuclear situation. The major emphasis was placed on the construction aspects of the structural concrete phase of each project. The engineering and design aspects were examined whenever they interfaced with the construction aspects

  11. A Mediation Analysis of a Tobacco Prevention Program for Adolescents in India: How Did Project MYTRI Work?

    Science.gov (United States)

    Stigler, Melissa Harrell; Perry, Cheryl L.; Smolenski, Derek; Arora, Monika; Reddy, K. Srinath

    2011-01-01

    This article presents the results of a mediation analysis of Project MYTRI (Mobilizing Youth for Tobacco Related Initiatives in India), a randomized, controlled trial of a multiple-component, school-based tobacco prevention program for sixth- to ninth-graders (n = 14,085) in Delhi and Chennai, India. A mediation analysis identifies "how"…

  12. A 50-year precipitation analysis over Europe at 5.5km within the UERRA project

    Science.gov (United States)

    Bazile, Eric; Abida, Rachid; Soci, Cornel; Verrelle, Antoine; Szczypta, Camille; Le Moigne, Patrick

    2017-04-01

    The UERRA project is a 4-year project (2014-2017) financed by the European Union under its 7th Framework Programme SPACE. One of its main objectives is to provide a 50-year reanalysis dataset of surface essential climate variables (ECV) at 5.5km grid at European scale, together with, as much as possible, uncertainty estimates. One of the ECV is the precipitation and this variable is of essential interest in weather forecasting, climate study and to "drive" hydrological model for water management, or agrometeorology. After a brief description of the method used for the precipitation analysis (Soci et al. 2016)during this project, the preliminary results will be presented. The estimation of uncertainties will be also discussed associated with the problem of the evolution of the observation density network and its impact on the long term series. Additional information about the UERRA project can be found at http://www.uerra.eu The research leading to these results has received funding from the European Union, Seventh Framework Programme (FP7-SPACE-2013-1) under grant agreement no 607193.

  13. Analysis of Construction Material Procurement Retardation on Sepaku-Petung Rigid Pavement Improvement Project in East Kalimantan Province

    Directory of Open Access Journals (Sweden)

    Rama Nugraha

    2017-11-01

    Full Text Available his study aims to know the factors influencing the retardation in procurement of construction materials on Sepaku-Petung pavement improvement project in East Kalimantan Province;to know the most dominant factor affecting the retardation in procurement of construction materials on Sepaku-Petung pavement improvement project in East Kalimantan Province; to determine what strategies that minimize the waiting time of materials in the improvement of Sepaku-Petung pavement project in East Kalimantan Province. This study used quantitative research method. The data was collected through interview, questionnaire distribution, and discussion forum. Based on the results of research and data analysis conducted, it can be concluded thatsuppliers, contractors, field conditions, and unpredictable conditionswere affecting the retardation in procurement of materials in the pavement improvement project in East Kalimantan. Field condition was the most dominant factors in the realization of Sepaku-Petung pavement improvement project in East Kalimantan province. Type B (Retarding Admixtures could be added to retard the time-binding of the concrete (setting time, therefore minimizing material procurement waiting time. The contractor should also build his own supplier close to the project site to reduce the distance between the concrete supplier location and the project site.

  14. Final Hazard Classification and Auditable Safety Analysis for the 105-F Building Interim Safe Storage Project

    International Nuclear Information System (INIS)

    Rodovsky, T.J.; Bond, S.L.

    1998-07-01

    The auditable safety analysis (ASA) documents the authorization basis for the partial decommissioning and facility modifications to place the 105-F Building into interim safe storage (ISS). Placement into the ISS is consistent with the preferred alternative identified in the Record of Decision (58 FR). Modifications will reduce the potential for release and worker exposure to hazardous and radioactive materials, as well as lower surveillance and maintenance (S ampersand M) costs. This analysis includes the following: A description of the activities to be performed in the course of the 105-F Building ISS Project. An assessment of the inventory of radioactive and other hazardous materials within the 105-F Building. Identification of the hazards associated with the activities of the 105-F Building ISS Project. Identification of internally and externally initiated accident scenarios with the potential to produce significant local or offsite consequences during the 105-F Building ISS Project. Bounding evaluation of the consequences of the potentially significant accident scenarios. Hazard classification based on the bounding consequence evaluation. Associated safety function and controls, including commitments. Radiological and other employee safety and health considerations

  15. GOATS Image Projection Component

    Science.gov (United States)

    Haber, Benjamin M.; Green, Joseph J.

    2011-01-01

    When doing mission analysis and design of an imaging system in orbit around the Earth, answering the fundamental question of imaging performance requires an understanding of the image products that will be produced by the imaging system. GOATS software represents a series of MATLAB functions to provide for geometric image projections. Unique features of the software include function modularity, a standard MATLAB interface, easy-to-understand first-principles-based analysis, and the ability to perform geometric image projections of framing type imaging systems. The software modules are created for maximum analysis utility, and can all be used independently for many varied analysis tasks, or used in conjunction with other orbit analysis tools.

  16. PERFORMANCE ANALYSIS OF PROJECTS IMPLEMENTATION IN HEIS

    Directory of Open Access Journals (Sweden)

    Sergiu-Vlad PETCU

    2015-04-01

    Full Text Available According to the European Commission, Romania is still facing significant mismatch between the skills of graduates of tertiary education and the market needs. This paper is highly relevant for the future implementation of HEIs, since they have a strong economic role and they can significantly influence long-term national social and economical development. Romania did not manage to materialize community funds allocated for the 2007-2013 programming period to its full potential. Accordingly, the proposed thesis intends to analyse how Romanian HEIs were able to manage community resources attracted by grants and how the implemented projects achieved their set objectives. According to the data collected so far, the results will show that the performance of the projects is directly dependent on the proportion of fully dedicated staff in organizational design of the project. The originality of the undertaken study is that it starts from a realistic approach, according to which the rules of the game should be adapted, depending on the players (in our case – HEIs.

  17. Managing complex, high risk projects a guide to basic and advanced project management

    CERN Document Server

    Marle, Franck

    2016-01-01

    Maximizing reader insights into project management and handling complexity-driven risks, this book explores propagation effects, non-linear consequences, loops, and the emergence of positive properties that may occur over the course of a project. This book presents an introduction to project management and analysis of traditional project management approaches and their limits regarding complexity. It also includes overviews of recent research works about project complexity modelling and management as well as project complexity-driven issues. Moreover, the authors propose their own new approaches, new methodologies and new tools which may be used by project managers and/or researchers and/or students in the management of their projects. These new elements include project complexity definitions and frameworks, multi-criteria approaches for project complexity measurement, advanced methodologies for project management (propagation studies to anticipate potential behaviour of the project, and clustering approaches...

  18. Peculiarities of emotional sphere in orphans: analysis through projective drawing test

    Directory of Open Access Journals (Sweden)

    Vetoshkina S.A.

    2015-06-01

    Full Text Available The article provides an analysis of the foreign and national literature in the area of formation and functioning of the orphans’ emotional sphere. The specific conditions in which the development of this category of children occurs ("deprivation" and "non-maternal care" are regarded as a determinant of deviation in the emotional status of children brought up in institutions. The article also contains preliminary data of the author's own research, aimed at studying of features of orphans’ emotional sphere with the help of drawing projective techniques, which are further compared to the data obtained in foreign studies.

  19. Comparative risk analysis for the Rocky Flats Plant integrated project planning

    International Nuclear Information System (INIS)

    Jones, M.E.; Shain, D.I.

    1994-01-01

    The Rocky Flats Plant is developing, with active stakeholder participation, a comprehensive planning strategy that will support transition of the Rocky Flats Plant from a nuclear weapons production facility to site cleanup and final disposition. Consideration of the interrelated nature of sitewide problems, such as material movement and disposition, facility and land use endstates, costs, relative risks to workers and the public, and waste disposition are all needed. Comparative Risk Analysis employs both incremental risk and cumulative risk evaluations to compare risks from postulated options or endstates and is an analytical tool for the Rocky Flats Plant Integrated Project Planning which can assist a decision-maker in evaluating relative risks among proposed remediation activity. However, risks from all of the remediation activities, decontamination and decommissioning activities, and normal ongoing operations are imposed upon the Rocky Flats workers, the surrounding public, and the environment. Comparative Risk Analysis will provide risk information, both human health and ecological, to aid in reducing unnecessary resource and monetary expenditures by focusing these resources on the largest risks first. Comparative Risk Analysis has been developed to aggregate various incremental risk estimates to develop a site cumulative risk estimate. The Comparative Risk Analysis methodology Group, consisting of community stakeholders, was established. Early stakeholder involvement in the risk analysis methodology development provides an opportunity for stakeholders to influence the risk information delivered to a decision-maker. This paper discusses development of the Comparative Risk Analysis methodology, stakeholder participation and lessons learned from these challenges

  20. Hanford isotope project strategic business analysis yttrium-90 (Y-90)

    International Nuclear Information System (INIS)

    1995-10-01

    The purpose of this analysis is to address the short-term direction for the Hanford yttrium-90 (Y-90) project. Hanford is the sole DOE producer of Y-90, and is the largest repository for its source in this country. The production of Y-90 is part of the DOE Isotope Production and Distribution (IP and D) mission. The Y-90 is ''milked'' from strontium-90 (Sr-90), a byproduct of the previous Hanford missions. The use of Sr-90 to produce Y-90 could help reduce the amount of waste material processed and the related costs incurred by the clean-up mission, while providing medical and economic benefits. The cost of producing Y-90 is being subsidized by DOE-IP and D due to its use for research, and resultant low production level. It is possible that the sales of Y-90 could produce full cost recovery within two to three years, at two curies per week. Preliminary projections place the demand at between 20,000 and 50,000 curies per year within the next ten years, assuming FDA approval of one or more of the current therapies now in clinical trials. This level of production would incentivize private firms to commercialize the operation, and allow the government to recover some of its sunk costs. There are a number of potential barriers to the success of the Y-90 project, outside the control of the Hanford Site. The key issues include: efficacy, Food and Drug Administration (FDA) approval and medical community acceptance. There are at least three other sources for Y-90 available to the US users, but they appear to have limited resources to produce the isotope. Several companies have communicated interest in entering into agreements with Hanford for the processing and distribution of Y-90, including some of the major pharmaceutical firms in this country

  1. Hanford isotope project strategic business analysis yttrium-90 (Y-90)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-10-01

    The purpose of this analysis is to address the short-term direction for the Hanford yttrium-90 (Y-90) project. Hanford is the sole DOE producer of Y-90, and is the largest repository for its source in this country. The production of Y-90 is part of the DOE Isotope Production and Distribution (IP and D) mission. The Y-90 is ``milked`` from strontium-90 (Sr-90), a byproduct of the previous Hanford missions. The use of Sr-90 to produce Y-90 could help reduce the amount of waste material processed and the related costs incurred by the clean-up mission, while providing medical and economic benefits. The cost of producing Y-90 is being subsidized by DOE-IP and D due to its use for research, and resultant low production level. It is possible that the sales of Y-90 could produce full cost recovery within two to three years, at two curies per week. Preliminary projections place the demand at between 20,000 and 50,000 curies per year within the next ten years, assuming FDA approval of one or more of the current therapies now in clinical trials. This level of production would incentivize private firms to commercialize the operation, and allow the government to recover some of its sunk costs. There are a number of potential barriers to the success of the Y-90 project, outside the control of the Hanford Site. The key issues include: efficacy, Food and Drug Administration (FDA) approval and medical community acceptance. There are at least three other sources for Y-90 available to the US users, but they appear to have limited resources to produce the isotope. Several companies have communicated interest in entering into agreements with Hanford for the processing and distribution of Y-90, including some of the major pharmaceutical firms in this country.

  2. Coast Guard Enterprise Project Management (CG-EPM)

    Data.gov (United States)

    Department of Homeland Security — CG-EPM provides the following capabilities: A Project Center, Portfolio Analysis Tools, Project Planning Tool, Web-based Project Plan Updater, Project Collaboration...

  3. GENRE ANALYSIS OF THE ENGLISH FINAL PROJECT ABSTRACTS WRITTEN BY THE STUDENTS OF ENGLISH EDUCATION DEPARTMENT OF IKIP PGRI SEMARANG

    Directory of Open Access Journals (Sweden)

    Wiyaka Wiyaka

    2010-12-01

    Full Text Available This study is specifically focused on the student final project abstract based on genre analysis which covers the study of the generic structure and the linguistic features. The statements of the study are: (1. How do the students of English Education Department of IKIP PGRI Semarang realize the generic structure in their final project abstracts (2. How do they realize the linguistic features in their final project abstracts, and (3. What is the contribution of the result of the study to the English Education Program of IKIP PGRI Semarang. The main purpose of this study is to find out the generic structure and linguistic features of the final project abstracts and analyze the contribution of this study to the English Department. This study applies the descriptive qualitative method. The object of this study is the final project abstracts written by English Education Department students of ‘IKIP PGRI Semarang’. The total of 10 final projects formed the data of this study. The data of the study were analyzed using the genre analysis approach. The first step of data analysis was identifying the Moves which was done by using Linguistic evidence and understanding the texts. The finding shows that only some of the final project abstracts made by the students of IKIP PGRI applied the five Moves. It is found that two Moves are applied in all abstracts, they are Purpose and Method Moves (100%. Situating the research is used in five abstracts (50%. Meanwhile the third move that is the Result Move used in eight abstracts (80%. The Conclusion Move found in five abstracts (50%. The result of the analysis showed that two personal pronouns were found in the final project abstracts. Personal pronouns such as ‘the writer’ and ‘the researcher’ were found in all of the abstracts. Personal pronoun ‘she’ was found in one abstract. Finally, there are only five expressions of hedges that are used in the final project abstracts, they

  4. Project Management Performance Drivers

    OpenAIRE

    Ra’ad, Mohammed A.; Najdawi, Mohammad K.

    2010-01-01

    The practice of project management has gained enormous importance over the past several years in various business industries. “In industries as diverse as pharmaceuticals, software, and aerospace, projects drive business” (Wheatley). This gain of importance can be attributed to the magnitude of the impact project performance results in terms of time, cost, and scope have over the project performing entity. “On the basis of data released by the Bureau of Economic Analysis, part of the US De...

  5. UMTRA project water sampling and analysis plan, Falls City, Texas. Revision 1

    International Nuclear Information System (INIS)

    1995-09-01

    Planned, routine ground water sampling activities at the US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project site near Falls City, Texas, are described in this water sampling and analysis plan (WSAP). The following plan identifies and justifies the sampling locations, analytical parameters, and sampling frequency for the routine monitoring stations at the site. The ground water data are used for site characterization and risk assessment. The regulatory basis for routine ground water monitoring at UMTRA Project sites is derived from the US Environmental Protection Agency (EPA) regulations in 40 CFR Part 192. Sampling procedures are guided by the UMTRA Project standard operating procedures (SOP) (JEG, n.d.), the Technical Approach Document (TAD) (DOE, 1989), and the most effective technical approach for the site. The Falls City site is in Karnes County, Texas, approximately 8 miles [13 kilometers southwest of the town of Falls City and 46 mi (74 km) southeast of San Antonio, Texas. Before surface remedial action, the tailings site consisted of two parcels. Parcel A consisted of the mill site, one mill building, five tailings piles, and one tailings pond south of Farm-to-Market (FM) Road 1344 and west of FM 791. A sixth tailings pile designated Parcel B was north of FM 791 and east of FM 1344

  6. Demographic Models for Projecting Population and Migration: Methods for African Historical Analysis

    Directory of Open Access Journals (Sweden)

    Patrick Manning

    2015-08-01

    Full Text Available This study presents methods for projecting population and migration over time in cases were empirical data are missing or undependable. The methods are useful for cases in which the researcher has details of population size and structure for a limited period of time (most obviously, the end point, with scattered evidence on other times. It enables estimation of population size, including its structure in age, sex, and status, either forward or backward in time. The program keeps track of all the details. The calculated data can be reported or sampled and compared to empirical findings at various times and places to expected values based on other procedures of estimation. The application of these general methods that is developed here is the projection of African populations backwards in time from 1950, since 1950 is the first date for which consistently strong demographic estimates are available for national-level populations all over the African continent. The models give particular attention to migration through enslavement, which was highly important in Africa from 1650 to 1900. Details include a sensitivity analysis showing relative significance of input variables and techniques for calibrating various dimensions of the projection with each other. These same methods may be applicable to quite different historical situations, as long as the data conform in structure to those considered here.

  7. Investment opportunity in China's overseas oil project: An empirical analysis based on real option approach

    International Nuclear Information System (INIS)

    Tang, Bao-Jun; Zhou, Hui-Ling; Chen, Hao; Wang, Kai; Cao, Hong

    2017-01-01

    China's overseas oil investments uphold national energy security. Located in the complex international economic and political environment, the benefits of overseas oil projects are affected by various uncertainties. Oil companies call for a set of evaluation method dealing with these uncertainties, especially when encountering low-oil-price conditions. It is much more crucial to answer when to optimally invest rather than whether to invest. This paper analyzes the investment opportunity of an oil project in the development and production phase considering uncertainty, irreversibility and management flexibility. The decision-making process combines Discounted Cash Flow (DCF) method and the trinomial tree model of Real Option Approach (ROA). For practical purposes, tools of hurdle price, cumulative probability and decision tree are adopted. In addition, results of the case project show the economic feasibility at present and optimal start-up timing at the end of 2016. Besides, the lower cost parameters generally make it easier to meet the opportunity. The scenario analysis suggests the higher risk contributes to an earlier start-up. Furthermore, the issues of method applicability, investment signals and decision-lag effects are discussed. - Highlights: • Volatility is combined with fluctuations in oil price, exchange rate and political situation. • Hurdle price is adopted as a critical price to measure investment opportunity. • Scenario analysis suggests the higher risk contribute to earlier investment timing.

  8. Thermal Analysis of a Dry Storage Concept for Capsule Dry Storage Project

    International Nuclear Information System (INIS)

    JOSEPHSON, W.S.

    2003-01-01

    There are 1,936 cesium (Cs) and strontium (Sr) capsules stored in pools at the Waste Encapsulation and Storage Facility (WESF). These capsules will be moved to dry storage on the Hanford Site as an interim measure to reduce risk. The Cs/Sr Capsule Dry Storage Project is conducted under the assumption that the capsules will eventually be moved to the repository at Yucca Mountain, and the design criteria include requirements that will facilitate acceptance at the repository. The storage system must also permit retrieval of capsules in the event that vitrification of the capsule contents is pursued. The Capsule Advisory Panel (CAP) was created by the Project Manager for the Hanford Site Capsule Dry Storage Project (CDSP). The purpose of the CAP is to provide specific technical input to the CDSP; to identify design requirements; to ensure design requirements for the project are conservative and defensible; to identify and resolve emerging, critical technical issues, as requested; and to support technical reviews performed by regulatory organizations, as requested. The CAP will develop supporting and summary documents that can be used as part of the technical and safety bases for the CDSP. The purpose of capsule dry storage thermal analysis is to: (1) Summarize the pertinent thermal design requirements sent to vendors, (2) Summarize and address the assumptions that underlie those design requirements, (3) Demonstrate that an acceptable design exists that satisfies the requirements, (4) Identify key design features and phenomena that promote or impede design success, (5) Support other CAP analyses such as corrosion and integrity evaluations, and (6) Support the assessment of proposed designs. It is not the purpose of this report to optimize or fully analyze variations of postulated acceptable designs. The present evaluation will indicate the impact of various possible design features, but not systematically pursue design improvements obtainable through analysis

  9. UMTRA Project water sampling and analysis plan, Grand Junction, Colorado. Revision 1, Version 6

    International Nuclear Information System (INIS)

    1995-09-01

    This water sampling and analysis plan describes the planned, routine ground water sampling activities at the Grand Junction US DOE Uranium Mill Tailings Remedial Action (UMTRA) Project site (GRJ-01) in Grand Junction, Colorado, and at the Cheney Disposal Site (GRJ-03) near Grand Junction. The plan identifies and justifies the sampling locations, analytical parameters, detection limits, and sampling frequencies for the routine monitoring stations at the sites. Regulatory basis is in the US EPA regulations in 40 CFR Part 192 (1994) and EPA ground water quality standards of 1995 (60 FR 2854). This plan summarizes results of past water sampling activities, details water sampling activities planned for the next 2 years, and projects sampling activities for the next 5 years

  10. Diagnosing risks in product-innovation projects

    NARCIS (Netherlands)

    Halman, Johannes I.M.; Keizer, J.A.

    A new method of diagnosing risks in product-innovation projects is introduced in the paper. The method is an improvement on existing risk methods used on product-innovation projects, such as potential problem analysis and failure mode and effects analysis. Technological, organizational and

  11. Diagnosing risks in product-innovation projects

    NARCIS (Netherlands)

    Halman, J.I.M.; Keizer, J.A.

    1994-01-01

    A new method of diagnosing risks in product-innovation projects is introduced in the paper. The method is an improvement on existing risk methods used on product-innovation projects, such as potential problem analysis and failure mode and effects analysis. Technological, organizational and

  12. Performance analysis for waste repositories in the nordic countries. Report for project AFA-1.2

    Energy Technology Data Exchange (ETDEWEB)

    Vuori, S. [VTT Energy (Finland); Broden, K. [Studsvik RadWaste AB (Sweden); Carugati, S.; Brodersen, K. [Forskningscenter Risoe (Denmark); Walderhaug, T. [Icelandic Radiation Protection Institute (Iceland); Helgason, J. [Ekra Geological Consulting (Iceland); Sneve, M.; Hornkjoel, S. [Norwegian Radiation Protection (Norway); Backe, S. [IFE (Norway)

    1997-02-01

    The Nordic Nuclear Safety Research (NKS) project (AFA-1) focused on safety in the final disposal of long-lived low and medium level radioactive waste and its sub project (AFA-1.2), where this report has been produced, is dealing with the performance analysis of the engineered barrier system (near-field) of the repositories for low-and medium level wastes. The topic intentionally excludes the discussion of the characteristics of the geological host medium. Therefore a more generic discussion of the features of performance analysis is possible independent of the fact that different host media are considered in the Nordic countries. The different waste management systems existing and planned in the Nordic countries are shortly described in the report. In the report main emphasis is paid on the general repositories. Some of the phenomena and interactions relevant for a generic type of repository are discussed as well. Among the different approaches for the development of scenarios for safety and performance analyses one particular method - the Rock Engineering System (RES) - was chosen to be demonstratively tested in a brainstorming session, where the possible interactions and their safety significance were discussed employing a simplified and generic Nordic repository system as the reference system. As an overall impression, the AFA-project group concludes that the use of the RES approach is very easy to learn even during a short discussion session. The use of different ways to indicate the safety significance of various interactions in a graphical user interface increases the clarity. Within the project a simple software application was developed employing a generally available spread sheet programme. The developed tool allows an easy opportunity to link the cell specific comments readily available for the `reader` of the obtained results. A short review of the performance analyses carried out in the Nordic countries for actual projects concerning repositories for

  13. Performance analysis for waste repositories in the nordic countries. Report for project AFA-1.2

    International Nuclear Information System (INIS)

    Vuori, S.; Broden, K.; Carugati, S.; Brodersen, K.; Walderhaug, T.; Helgason, J.; Sneve, M.; Hornkjoel, S.; Backe, S.

    1997-02-01

    The Nordic Nuclear Safety Research (NKS) project (AFA-1) focused on safety in the final disposal of long-lived low and medium level radioactive waste and its sub project (AFA-1.2), where this report has been produced, is dealing with the performance analysis of the engineered barrier system (near-field) of the repositories for low-and medium level wastes. The topic intentionally excludes the discussion of the characteristics of the geological host medium. Therefore a more generic discussion of the features of performance analysis is possible independent of the fact that different host media are considered in the Nordic countries. The different waste management systems existing and planned in the Nordic countries are shortly described in the report. In the report main emphasis is paid on the general repositories. Some of the phenomena and interactions relevant for a generic type of repository are discussed as well. Among the different approaches for the development of scenarios for safety and performance analyses one particular method - the Rock Engineering System (RES) - was chosen to be demonstratively tested in a brainstorming session, where the possible interactions and their safety significance were discussed employing a simplified and generic Nordic repository system as the reference system. As an overall impression, the AFA-project group concludes that the use of the RES approach is very easy to learn even during a short discussion session. The use of different ways to indicate the safety significance of various interactions in a graphical user interface increases the clarity. Within the project a simple software application was developed employing a generally available spread sheet programme. The developed tool allows an easy opportunity to link the cell specific comments readily available for the 'reader' of the obtained results. A short review of the performance analyses carried out in the Nordic countries for actual projects concerning repositories for

  14. Management of research and development project

    International Nuclear Information System (INIS)

    Go, Seok Hwa; Hong Jeong Yu; Hyun, Byeong Hwan

    2010-12-01

    This book introduces summary on management of research and development project, prepare of research and development with investigation and analysis of paper, patent and trend of technology, structure of project, management model, management of project, management of project range, management of project time, management of project cost, management of project goods, management of project manpower, management of communication, management of project risk, management of project supply, management of outcome of R and D, management of apply and enroll of patent and management of technology transfer.

  15. Stress analysis of HLW containers. Compas project

    International Nuclear Information System (INIS)

    1989-01-01

    This document reports the work carried out for the Compas project which looked at the performance of various computer codes in a selected benchmark exercise. This exercise consisted of several analyses on simplified models which have features typical of HLW containers. These analyses comprise two groups; one related to thick walled, stressed shell overpacks, the other related to thin walled, supported shell overpacks with a lead filler. The first set of analyses looked at an elastic-plastic behaviour and large deformation of a cylinder representative of the main body of thick walled containers). The second set looked at creep behaviour of the lead filler, and the shape the base of thin walled containers will take up, after hundreds of years in the repository. On the thick walled analyses with the cylinder subject to an external pressure all the codes gave consistent results in the elastic region and there is good agreement in the yield pressures. Once in the plastic region there is more divergence in the results although a consistent trend is predicted. One of the analyses predicted a non-axisymmetric mode of deformation as would be expected in reality. Fewer results were received for the creep analysis, however the transient creep results showed consistency, and were bounded by the final-state results

  16. Utility-Scale Solar 2014. An Empirical Analysis of Project Cost, Performance, and Pricing Trends in the United States

    Energy Technology Data Exchange (ETDEWEB)

    Bolinger, Mark [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Seel, Joachim [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2015-09-01

    Other than the nine Solar Energy Generation Systems (“SEGS”) parabolic trough projects built in the 1980s, virtually no large-scale or “utility-scale” solar projects – defined here to include any groundmounted photovoltaic (“PV”), concentrating photovoltaic (“CPV”), or concentrating solar thermal power (“CSP”) project larger than 5 MWAC – existed in the United States prior to 2007. By 2012 – just five years later – utility-scale had become the largest sector of the overall PV market in the United States, a distinction that was repeated in both 2013 and 2014 and that is expected to continue for at least the next few years. Over this same short period, CSP also experienced a bit of a renaissance in the United States, with a number of large new parabolic trough and power tower systems – some including thermal storage – achieving commercial operation. With this critical mass of new utility-scale projects now online and in some cases having operated for a number of years (generating not only electricity, but also empirical data that can be mined), the rapidly growing utility-scale sector is ripe for analysis. This report, the third edition in an ongoing annual series, meets this need through in-depth, annually updated, data-driven analysis of not just installed project costs or prices – i.e., the traditional realm of solar economics analyses – but also operating costs, capacity factors, and power purchase agreement (“PPA”) prices from a large sample of utility-scale solar projects in the United States. Given its current dominance in the market, utility-scale PV also dominates much of this report, though data from CPV and CSP projects are presented where appropriate.

  17. Solid waste integrated cost analysis model: 1991 project year report. Part 2

    Energy Technology Data Exchange (ETDEWEB)

    1991-12-31

    The purpose of the City of Houston`s 1991 Solid Waste Integrated Cost Analysis Model (SWICAM) project was to continue the development of a computerized cost analysis model. This model is to provide solid waste managers with tool to evaluate the dollar cost of real or hypothetical solid waste management choices. Those choices have become complicated by the implementation of Subtitle D of the Resources Conservation and Recovery Act (RCRA) and the EPA`s Integrated Approach to managing municipal solid waste;. that is, minimize generation, maximize recycling, reduce volume (incinerate), and then bury (landfill) only the remainder. Implementation of an integrated solid waste management system involving all or some of the options of recycling, waste to energy, composting, and landfilling is extremely complicated. Factors such as hauling distances, markets, and prices for recyclable, costs and benefits of transfer stations, and material recovery facilities must all be considered. A jurisdiction must determine the cost impacts of implementing a number of various possibilities for managing, handling, processing, and disposing of waste. SWICAM employs a single Lotus 123 spreadsheet to enable a jurisdiction to predict or assess the costs of its waste management system. It allows the user to select his own process flow for waste material and to manipulate the model to include as few or as many options as he or she chooses. The model will calculate the estimated cost for those choices selected. The user can then change the model to include or exclude waste stream components, until the mix of choices suits the user. Graphs can be produced as a visual communication aid in presenting the results of the cost analysis. SWICAM also allows future cost projections to be made.

  18. Fundamentals of Project Management

    CERN Document Server

    Heagney, Joseph

    2011-01-01

    With sales of more than 160,000 copies, Fundamentals of Project Management has helped generations of project managers navigate the ins and outs of every aspect of this complex discipline. Using a simple step-by-step approach, the book is the perfect introduction to project management tools, techniques, and concepts. Readers will learn how to: ò Develop a mission statement, vision, goals, and objectives ò Plan the project ò Create the work breakdown structure ò Produce a workable schedule ò Understand earned value analysis ò Manage a project team ò Control and evaluate progress at every stage.

  19. Environmental Impact Assessment Process for Oil, Gas and Mining Projects in Nigeria: A Critical Analysis

    Directory of Open Access Journals (Sweden)

    Allan Ingelson and Chilenye Nwapi

    2014-06-01

    Full Text Available Oil and gas development projects are well known to have damaging environmental effects, and that is especially true in the Niger Delta region. Since the enactment of the Environmental Impact Assessment Act in Nigeria in 1992, there has been a general perception that EIAs are seldom carried out in the region. This article presents a critical analysis of legislation and practice concerning the environmental impact assessment (EIA process for oil and gas projects in Nigeria, the world’s twelfth largest producer of crude oil. It discusses a range of reasons why the impacts of oil and gas projects are not being managed well, despite the legal requirements for EIAs. A review of Nigeria’s environmental governance is presented along with a comprehensive discussion of the EIA process and its significant deficiencies. We argue that the EIA system for oil and gas projects in Nigeria reflects tokenism, resulting in the concentration of benefits of developments in big corporations and government officials. The EIA process in Nigeria faces many challenges that must be addressed in order to improve its effectiveness and alleviate the environmental burdens on this rich oil-producing region.

  20. Benefits Analysis of Past Projects. Volume 2. Individual Project Assessments.

    Science.gov (United States)

    1984-11-01

    010 inch. Chemical milling was found to be an effective method for removing the surface enrichment. Also 4140 and H13 steel dies were found to result... tooling surface due to the reaction r,* it;nium and t . 22-4-9 steel toolin,. Oxidation and leveling .I ,.. Jevelope in this project yielded tool life...dimensions without expensive tool rework. The process has a potential for reducing mold inclusions since the mold surfaces in contact with the metal can

  1. Cluster analysis and quality assessment of logged water at an irrigation project, eastern Saudi Arabia.

    Science.gov (United States)

    Hussain, Mahbub; Ahmed, Syed Munaf; Abderrahman, Walid

    2008-01-01

    A multivariate statistical technique, cluster analysis, was used to assess the logged surface water quality at an irrigation project at Al-Fadhley, Eastern Province, Saudi Arabia. The principal idea behind using the technique was to utilize all available hydrochemical variables in the quality assessment including trace elements and other ions which are not considered in conventional techniques for water quality assessments like Stiff and Piper diagrams. Furthermore, the area belongs to an irrigation project where water contamination associated with the use of fertilizers, insecticides and pesticides is expected. This quality assessment study was carried out on a total of 34 surface/logged water samples. To gain a greater insight in terms of the seasonal variation of water quality, 17 samples were collected from both summer and winter seasons. The collected samples were analyzed for a total of 23 water quality parameters including pH, TDS, conductivity, alkalinity, sulfate, chloride, bicarbonate, nitrate, phosphate, bromide, fluoride, calcium, magnesium, sodium, potassium, arsenic, boron, copper, cobalt, iron, lithium, manganese, molybdenum, nickel, selenium, mercury and zinc. Cluster analysis in both Q and R modes was used. Q-mode analysis resulted in three distinct water types for both the summer and winter seasons. Q-mode analysis also showed the spatial as well as temporal variation in water quality. R-mode cluster analysis led to the conclusion that there are two major sources of contamination for the surface/shallow groundwater in the area: fertilizers, micronutrients, pesticides, and insecticides used in agricultural activities, and non-point natural sources.

  2. [Analysis of ophthalmic projects granted by National Natural Science Foundation].

    Science.gov (United States)

    Shao, Jing-Jing; Mo, Xiao-Fen; Pan, Zhi-Qiang; Gan, De-Kang; Xu, Yan-Ying

    2008-09-01

    To understand the status of basic research work in the field of ophthalmology by analyzing the projects funded by the National Natural Science Foundation of China (NSFC) from the year of 1986 to 2007, and offer as a reference to the ophthalmologists and researchers. NSFC supported ophthalmology projects in the 22 year's period were collected from the database of NSFC. The field of funded projects, the research team and their achievements were analyzed. There were 228 applicants from 47 home institutions were funded in the field of ophthalmology during the past 22 years, 323 projects funded with 66.74 million Yuan in total, in which 165 projects were fulfilled before the end of 2006. The applied and funded projects mainly focus on six different kinds of research area related to retinal diseases, corneal diseases, glaucoma, optic nerve diseases, myopia and cataract, and 70% of them were basic research in nature. As a brief achievement of 165 fulfilled projects, more than 610 papers were published in domestic journals, over 140 papers were published in Science Citation Index journals, more than 600 people were trained, and over 20 scientific awards were obtained. The number of funded projects and achievement of fulfilled projects in the discipline of ophthalmology gradually increased over the past two decades, the research fields were concentrated in certain diseases. NSFC has played an important role in promoting the development of ophthalmology research and bringing up specialists in China. However, clinical research, continuously research, transforming from basic research to clinic applications and multidisciplinary cross studies should be strengthened.

  3. Economic-financial analysis of 'Angra 3 Nuclear Power Plant' project

    International Nuclear Information System (INIS)

    Andrade, Ronaldo Barata de

    2005-01-01

    This paper presents an economic-financial evaluation of 'Angra 3 Nuclear Power Plant' project and estimates the lowest power tariff value at which power potentially made available may be commercialized and yet ensure the project a profitability level agreeable to the interests of economic agents and shareholders. According to the 'project evaluation' practice, Angra 3 power generation was considered separately from ELETRONUCLEAR's operating plants (Angra 1 and Angra 2), thus preventing result distortions bound to occur if the economic-financial variables of the new project were analyzed associated with financial commitments and commercialization conditions resulting from the project implementation process and the generated power commercialization conditions, respectively. For this evaluation different technical and economic scenarios were devised, and the theory of Capital Asset Pricing Model for Own Capital cost and that of Weighted Average Cost of Capital were used in addition to the forecast of the Statement of Results and Free Cash flow of Shareholders throughout the power plant life, which is the estimate basis for the lowest power tariff value and the Internal Return Rate of the project. The evaluation conclusion is that Angra 3 project is technically and economically feasible and competitive as compared to the new large power generation projects planned for power supply in Brazil in the next decade, mainly in the Southeast. (author)

  4. UAS Integration in the NAS Project: Flight Test 3 Data Analysis of JADEM-Autoresolver Detect and Avoid System

    Science.gov (United States)

    Gong, Chester; Wu, Minghong G.; Santiago, Confesor

    2016-01-01

    The Unmanned Aircraft Systems Integration in the National Airspace System project, or UAS Integration in the NAS, aims to reduce technical barriers related to safety and operational challenges associated with enabling routine UAS access to the NAS. The UAS Integration in the NAS Project conducted a flight test activity, referred to as Flight Test 3 (FT3), involving several Detect-and-Avoid (DAA) research prototype systems between June 15, 2015 and August 12, 2015 at the Armstrong Flight Research Center (AFRC). This report documents the flight testing and analysis results for the NASA Ames-developed JADEM-Autoresolver DAA system, referred to as 'Autoresolver' herein. Four flight test days (June 17, 18, 22, and July 22) were dedicated to Autoresolver testing. The objectives of this test were as follows: 1. Validate CPA prediction accuracy and detect-and-avoid (DAA, formerly known as self-separation) alerting logic in realistic flight conditions. 2. Validate DAA trajectory model including maneuvers. 3. Evaluate TCAS/DAA interoperability. 4. Inform final Minimum Operating Performance Standards (MOPS). Flight test scenarios were designed to collect data to directly address the objectives 1-3. Objective 4, inform final MOPS, was a general objective applicable to the UAS in the NAS project as a whole, of which flight test is a subset. This report presents analysis results completed in support of the UAS in the NAS project FT3 data review conducted on October 20, 2015. Due to time constraints and, to a lesser extent, TCAS data collection issues, objective 3 was not evaluated in this analysis.

  5. Probability-of-success studies for geothermal projects: from subsurface data to geological risk analysis

    Science.gov (United States)

    Schumacher, Sandra; Pierau, Roberto; Wirth, Wolfgang

    2017-04-01

    In recent years, the development of geothermal plants in Germany has increased significantly due to a favorable political setting and resulting financial incentives. However, most projects are developed by local communities or private investors, which cannot afford a project to fail. To cover the risk of total loss if the geothermal well should not provide the energy output necessary for an economically viable project, investors try to procure insurances for this worst case scenario. In order to issue such insurances, the insurance companies insist on so called probability-of-success studies (POS studies), in which the geological risk for not achieving the necessary temperatures and/or flow rates for an economically successful project is quantified. Quantifying the probability of reaching a minimum temperature, which has to be defined by the project investors, is relatively straight forward as subsurface temperatures in Germany are comparatively well known due tens of thousands of hydrocarbon wells. Moreover, for the German Molasse Basin a method to characterize the hydraulic potential of a site based on pump test analysis has been developed and refined in recent years. However, to quantify the probability of reaching a given flow rate with a given drawdown is much more challenging in areas where pump test data are generally not available (e.g. the North German Basin). Therefore, a new method based on log and core derived porosity and permeability data was developed to quantify the geological risk of reaching a determined flow rate in such areas. We present both methods for POS studies and show how subsurface data such as pump tests or log and core measurements can be used to predict the chances of a potential geothermal project from a geological point of view.

  6. Spent nuclear fuel project technical databook

    Energy Technology Data Exchange (ETDEWEB)

    Reilly, M.A.

    1998-07-22

    The Spent Nuclear Fuel (SNF) project technical databook provides project-approved summary tables of selected parameters and derived physical quantities, with nominal design and safety basis values. It contains the parameters necessary for a complete documentation basis of the SNF Project technical and safety baseline. The databook is presented in two volumes. Volume 1 presents K Basins SNF related information. Volume 2 (not yet available) will present selected sludge and water information, as it relates to the sludge and water removal projects. The values, within this databook, shall be used as the foundation for analyses, modeling, assumptions, or other input to SNF project safety analyses or design. All analysis and modeling using a parameter available in this databook are required to use and cite the appropriate associated value, and document any changes to those values (i.e., analysis assumptions, equipment conditions, etc). Characterization and analysis efforts are ongoing to validate, or update these values.

  7. Spent nuclear fuel project technical databook

    International Nuclear Information System (INIS)

    Reilly, M.A.

    1998-01-01

    The Spent Nuclear Fuel (SNF) project technical databook provides project-approved summary tables of selected parameters and derived physical quantities, with nominal design and safety basis values. It contains the parameters necessary for a complete documentation basis of the SNF Project technical and safety baseline. The databook is presented in two volumes. Volume 1 presents K Basins SNF related information. Volume 2 (not yet available) will present selected sludge and water information, as it relates to the sludge and water removal projects. The values, within this databook, shall be used as the foundation for analyses, modeling, assumptions, or other input to SNF project safety analyses or design. All analysis and modeling using a parameter available in this databook are required to use and cite the appropriate associated value, and document any changes to those values (i.e., analysis assumptions, equipment conditions, etc). Characterization and analysis efforts are ongoing to validate, or update these values

  8. Assessing community-based conservation projects: A systematic review and multilevel analysis of attitudinal, behavioral, ecological, and economic outcomes

    Directory of Open Access Journals (Sweden)

    Brooks Jeremy

    2013-01-01

    Full Text Available Abstract Background Community-based conservation (CBC promotes the idea that long-term conservation success requires engaging with, and providing benefits for local communities. Though widespread, CBC projects are not always successful or free of controversy. With criticisms on all sides of the conservation debates, it is critical to have a better understanding of (1 whether CBC is an effective conservation tool, and (2 of the factors associated with the success or failure of CBC projects, and the scale at which these factors operate. Recent CBC reviews have typically examined only a single resource domain, have limited geographic scope, consider only one outcome, or ignore the nested nature of socioecological systems. To remedy these issues, we use a newly coded global comparative database of CBC projects identified by systematic review to evaluate success in four outcome domains (attitudes, behaviors, ecological, economic and explore synergies and tradeoffs among these outcomes. We test hypotheses about how features of the national context (H-NC, project design (H-PD, and local community characteristics (H-CC affect these four measures of success. Methods To add to a sample of 62 projects that we used from previous systematic reviews, we systematically searched the conservation literature using six terms in four online databases. To increase the number of projects for each country in order to conduct a multilevel analysis, we also conducted a secondary search using the Advancing Conservation in a Social Context online library. We coded projects for 65 pieces of information. We conducted bivariate analyses using two-dimensional contingency tables and proportional odds logistic regression and conducted multivariate analyses by fitting reduced form proportional odds logistic regression models that were selected using a forward stepwise AIC approach. Results The primary and secondary searches produced 74 new projects to go along with the 62

  9. The IT project manager competencies that impact project success – A qualitative research

    Directory of Open Access Journals (Sweden)

    Cíntia Cristina Silva de Araújo

    2015-07-01

    Full Text Available Since there is a lack of studies about the relationship of IT project manager competencies and project success, this paper will address the following research question: Which competencies should IT project managers develop in order to achieve success in IT projects? To answer this question, we conducted a qualitative research with an exploratory approach. To collect data, twelve (12 in-depth interviews were done with Brazilian project managers from different companies from several business sectors. The analysis results pointed out that for our respondents the most needed category of competencies are team management, business domain knowledge,  communication, project management and people skills. As other authors have affirmed, technical skills were considered to be less relevant to project success than interpersonal and intrapersonal competencies.

  10. Project for the completion of a probabilistic safety analysis of an industrial irradiation

    International Nuclear Information System (INIS)

    Ferro, R.; Troncoso, M.

    1995-01-01

    The probabilistic safety analysis is a very valuable instrument in safety studies of facilities with potential risk for the personnel, population and environment. One of the possible field of use of PSA techniques in the safety studies for industrial irradiation where serious accidents have occurred. For this reason a project has been undertaken to carry out the PSA in the Irradiation Plant of Research Institute of the Food Industry, which complements the safety studies of this facility

  11. Review of U.S. ESCO industry market trends: An empirical analysis of project data

    Energy Technology Data Exchange (ETDEWEB)

    Goldman, Charles A.; Hopper, Nicole C.; Osborn, Julie G.; Singer, Terry E.

    2003-03-01

    This article summarizes a comprehensive empirical analysis of U.S. Energy Service Company (ESCO) industry trends and performance. We employ two parallel analytical approaches: a comprehensive survey of firms to estimate total industry size and a database of {approx}1500 ESCO projects, from which we report target markets and typical project characteristics, energy savings and customer economics. We estimate that industry investment for energy-efficiency related services reached US $2 billion in 2000 following a decade of strong growth. ESCO activity is concentrated in states with high economic activity and strong policy support. Typical projects save 150-200 MJ/m2/year and are cost-effective with median benefit/cost ratios of 1.6 and 2.1 for institutional and private sector projects. The median simple payback time is 7 years among institutional customers; 3 years is typical in the private sector. Reliance on DSM incentives has decreased since 1995. Preliminary evidence suggests that state enabling policies have boosted the industry in medium-sized states. ESCOs have proven resilient in the face of restructuring and will probably shift toward selling ''energy solutions,'' with energy efficiency part of a package. We conclude that a private sector energy-efficiency services industry that targets large commercial and industrial customers is viable and self-sustaining with appropriate policy support both financial and non-financial.

  12. Critical path analysis in early stage of nuclear power project

    International Nuclear Information System (INIS)

    Xie Ahai

    2009-01-01

    The technical program and contract model as well as project management system and preliminary design defined in the early stage of nuclear power project are the key condition impact on the quality, schedule and cost of the nuclear power project. This paper, taking the CPR1000 coastal nuclear power station as an example, analyzes the critical path in the early stage of nuclear power project for five fields, i.e. licensing, design and procurement, site preparation, tender of construction contracts and construction preparation, and organization. (authors)

  13. Supplement to the UMTRA Project water sampling and analysis plan, Maybell, Colorado

    International Nuclear Information System (INIS)

    1995-09-01

    This water sampling and analysis plan (WSAP) supplement supports the regulatory and technical basis for water sampling at the Maybell, Colorado, Uranium Mill Tailings Remedial Action (UMTRA) Project site, as defined in the 1994 WSAP document for Maybell (DOE, 1994a). Further, this supplement serves to confirm our present understanding of the site relative to the hydrogeology and contaminant distribution as well as our intention to continue to use the sampling strategy as presented in the 1994 WSAP document for Maybell. Ground water and surface water monitoring activities are derived from the US Environmental Protection Agency regulations in 40 CFR Part 192 (1994) and 60 CFR 2854 (1 995). Sampling procedures are guided by the UMTRA Project standard operating procedures (JEG, n.d.), the Technical Approach Document (DOE, 1989), and the most effective technical approach for the site. Additional site-specific documents relevant to the Maybell site are the Maybell Baseline Risk Assessment (currently in progress), the Maybell Remedial Action Plan (RAP) (DOE, 1994b), and the Maybell Environmental Assessment (DOE, 1995)

  14. Strategy as Projects

    DEFF Research Database (Denmark)

    Lund Pedersen, Carsten; Ritter, Thomas; Andersen, Torben Juul

    This paper proposes the adoption of a project-based view to analyze strategy formation and strategic renewal over time. Projects are resource-committing, empirically-tracable investments, and as such, particularly suitable for the analysis of different manifestations of intended strategies as well...... as post-hoc manifestations of deviant, even rebellious, actions taken in opposition to the initial strategy announcement. The paper presents an analytical framework (a 5x2 matrix) of ten different project categories that together allows researchers to investigate how strategic renewal is realized through...... the enactment of different types of project initiatives throughout the organization. The developed framework is validated by two field studies that outline the robustness of the proposed matrix. In addition to the demonstration of the advantages of the framework, we discuss the limitations of the strategy-as-projects...

  15. Articulating current service development practices: a qualitative analysis of eleven mental health projects.

    Science.gov (United States)

    Jun, Gyuchan Thomas; Morrison, Cecily; Clarkson, P John

    2014-01-17

    The utilisation of good design practices in the development of complex health services is essential to improving quality. Healthcare organisations, however, are often seriously out of step with modern design thinking and practice. As a starting point to encourage the uptake of good design practices, it is important to understand the context of their intended use. This study aims to do that by articulating current health service development practices. Eleven service development projects carried out in a large mental health service were investigated through in-depth interviews with six operation managers. The critical decision method in conjunction with diagrammatic elicitation was used to capture descriptions of these projects. Stage-gate design models were then formed to visually articulate, classify and characterise different service development practices. Projects were grouped into three categories according to design process patterns: new service introduction and service integration; service improvement; service closure. Three common design stages: problem exploration, idea generation and solution evaluation - were then compared across the design process patterns. Consistent across projects were a top-down, policy-driven approach to exploration, underexploited idea generation and implementation-based evaluation. This study provides insight into where and how good design practices can contribute to the improvement of current service development practices. Specifically, the following suggestions for future service development practices are made: genuine user needs analysis for exploration; divergent thinking and innovative culture for idea generation; and fail-safe evaluation prior to implementation. Better training for managers through partnership working with design experts and researchers could be beneficial.

  16. The Navruz Project: Transboundary Monitoring for Radionuclides and Metals in Central Asia Rivers. Sampling and Analysis Plan and Operational Manual

    International Nuclear Information System (INIS)

    Passell, Howard D.; Barber, David S.; Betsill, J. David; Littlfield, Adriane C.; Mohagheghi, Amir H.; Shanks, Sonoya T.; Yuldashev, Bekhzad; Salikhbaev, Umar; Radyuk, Raisa; Djuraev, Akram; Djuraev, Amwar; Vasilev, Ivan; Tolongutov, Bajgabyl; Valentina, Alekhina; Solodukhin, Vladimir; Pozniak, Victor

    2002-01-01

    The transboundary nature of water resources demands a transboundary approach to their monitoring and management. However, transboundary water projects raise a challenging set of problems related to communication issues, and standardization of sampling, analysis and data management methods. This manual addresses those challenges and provides the information and guidance needed to perform the Navruz Project, a cooperative, transboundary, river monitoring project involving rivers and institutions in Kazakhstan, Kyrgyzstan, Tajikistan, and Uzbekistan facilitated by Sandia National Laboratories in the U.S. The Navruz Project focuses on waterborne radionuclides and metals because of their importance to public health and nuclear materials proliferation concerns in the region. This manual provides guidelines for participants on sample and data collection, field equipment operations and procedures, sample handling, laboratory analysis, and data management. Also included are descriptions of rivers, sampling sites and parameters on which data are collected. Data obtained in this project are shared among all participating countries and the public through an internet web site, and are available for use in further studies and in regional transboundary water resource management efforts. Overall, the project addresses three main goals: to help increase capabilities in Central Asian nations for sustainable water resources management; to provide a scientific basis for supporting nuclear transparency and non-proliferation in the region; and to help reduce the threat of conflict in Central Asia over water resources, proliferation concerns, or other factors.

  17. The Navruz Project: Transboundary Monitoring for Radionuclides and Metals in Central Asia Rivers. Sampling and Analysis Plan and Operational Manual

    Energy Technology Data Exchange (ETDEWEB)

    Passell, Howard D.; Barber, David S.; Betsill, J. David; Littlfield, Adriane C.; Mohagheghi, Amir H.; Shanks, Sonoya T.; Yuldashev, Bekhzad; Salikhbaev, Umar; Radyuk, Raisa; Djuraev, Akram; Djuraev, Amwar; Vasilev, Ivan; Tolongutov, Bajgabyl; Valentina, Alekhina; Solodukhin, Vladimir; Pozniak, Victor

    2002-04-02

    The transboundary nature of water resources demands a transboundary approach to their monitoring and management. However, transboundary water projects raise a challenging set of problems related to communication issues, and standardization of sampling, analysis and data management methods. This manual addresses those challenges and provides the information and guidance needed to perform the Navruz Project, a cooperative, transboundary, river monitoring project involving rivers and institutions in Kazakhstan, Kyrgyzstan, Tajikistan, and Uzbekistan facilitated by Sandia National Laboratories in the U.S. The Navruz Project focuses on waterborne radionuclides and metals because of their importance to public health and nuclear materials proliferation concerns in the region. This manual provides guidelines for participants on sample and data collection, field equipment operations and procedures, sample handling, laboratory analysis, and data management. Also included are descriptions of rivers, sampling sites and parameters on which data are collected. Data obtained in this project are shared among all participating countries and the public through an internet web site, and are available for use in further studies and in regional transboundary water resource management efforts. Overall, the project addresses three main goals: to help increase capabilities in Central Asian nations for sustainable water resources management; to provide a scientific basis for supporting nuclear transparency and non-proliferation in the region; and to help reduce the threat of conflict in Central Asia over water resources, proliferation concerns, or other factors.

  18. Examining the impacts of Feed-in-Tariff and the Clean Development Mechanism on Korea's renewable energy projects through comparative investment analysis

    International Nuclear Information System (INIS)

    Koo, Bonsang

    2017-01-01

    Renewable energy projects in Korea have two avenues that provide subsidies to increase their financial viability. Feed-in-Tariffs (FITs) offer cost based prices for renewable electricity to compete with conventional energy producers. The Clean Development Mechanism (CDM) issues certified emission reduction (CER) credits that generate additional revenues, enhancing renewable projects’ return on investment. This study investigated how these subsidies impact the financial returns on Korea's CDM projects. An investment analysis was performed on four cases including solar, hydropower, wind and landfill gas projects. Revenues from electricity sales, FITs and CERs were compared using financial indicators to measure their relative contributions on profitability. Results indicate that CDM is partial towards large scale projects with high emission reductions. Moreover, conflicts with FIT schemes can deter small scale, capital intensive projects from pursuing registration. The analysis highlights CDM's bias for particular project types, which is in part due to its impartiality towards carbon credit prices. It also reveals that Korea, a key benefactor of CDM, is susceptible to such biases, as demonstrated by the disproportionate distribution of issued CERs. Improving incentives for bundled, small scale projects, CER price differentiation, and excluding domestic subsidies during additionality testing are proposed as possible reforms. - Highlights: • Korea constitute 8.2% of total CERs issued, third largest in the world after China and India. • CDM favors commercially competitive projects of large scale and high emissions. • 91% of issued CERs from GWP gas; of renewables, 88% from landfill gas and wind. • CER revenues marginal for small scale, commercially less attractive projects. • Conflicts with FIT potentially deters small scale projects from registration.

  19. Space diffuses multiobjective analysis: A tool to locate lineal projects with a focus of environmental management

    International Nuclear Information System (INIS)

    Patricia Jaramillo A Liliana Vinasco T

    2005-01-01

    This paper presents a methodological proposal that is developed to identify corridors for lineal projects (highways, transmission lines, pipelines, etc), with environmental management criteria, when there is not complete information about the area of influence of the project, or some of the information is imprecise. Also a computational module is developed that allow the use of the methodological proposal. The proposal is based in the fuzzy multiobjective analysis concept, which takes elements of the diffuse logic and the traditional Multiobjective Analysis; the first one, it conserves its properties with imprecise information and of the second allows, the minimization of multiple objective correspond to the least environmental the physical, biological, cultural, economical and political dimensions of the environment uses the Geographic Information SIG this proposal is being constituted a complete tool for taking decisions in which space attributed is included. The FMA is a recent technique that is in development [S integration to GIS is stiller. The proposal is a contribution to the construction of a conceptual scheme for future applications in this aspects constitute a tool for the environmental planning which decreasing the risks, future cost analysis of natural resources and human group

  20. A multilevel study of the impact of project manager's leadership on extra-role performance of project team members

    Science.gov (United States)

    Shokory, Suzyanty Mohd; Suradi, Nur Riza Mohd

    2018-04-01

    The current study examines the impact of transformational and transactional leadership of project manager on the extra-role performance of project team members. In addition, this study also identifies factor dominant to extra-role performance of project team members when the transformational and transactional leadership of project managers are analyzed simultaneously. The study involved 175 of project team members from 35 project teams (each project team consists of different contracting companies registered in the Selangor (N = 175 from 35 contractors company). A multilevel analysis with hierarchical linear modeling (HLM) approach was used in this study. The analysis showed that transformational and transactional leadership of the project manager is a positive significant with extra-role performance project team members when analyzed separately. However when the two constructs (transformational leadership and transactional leadership of project manager) were analyzed simultaneously, transformational leadership was found to have more impact on extra-role performance project team members compared to transactional leadership. These findings explained that although transformational and transactional leadership of project managers can improve extra-role performance project team members, but this study has proved that transformational leadership of project managers affect extra-role performance project team members more as compared to transactional leadership.

  1. Global Inventory and Analysis of Smart Grid Demonstration Projects

    Energy Technology Data Exchange (ETDEWEB)

    Mulder, W.; Kumpavat, K.; Faasen, C.; Verheij, F.; Vaessen, P [DNV KEMA Energy and Sustainability, Arnhem (Netherlands)

    2012-10-15

    As the key enabler of a more sustainable, economical and reliable energy system, the development of smart grids has received a great deal of attention in recent times. In many countries around the world the benefits of such a system have begun to be investigated through a number of demonstration projects. With such a vast array of projects it can be difficult to keep track of changes, and to understand which best practices are currently available with regard to smart grids. This report aims to address these issues through providing a comprehensive outlook on the current status of smart grid projects worldwide.

  2. ORGANIZATIONAL PROJECT MANAGEMENT MATURITY

    Directory of Open Access Journals (Sweden)

    Yana Derenskaya

    2017-11-01

    Full Text Available The present article is aimed at developing a set of recommendations for achieving a higher level of organizational project maturity at a given enterprise. Methodology. For the purposes of the current research, the available information sources on the components of project management system are analysed; the essence of “organizational maturity” and the existing models of organizational maturity are studied. The method of systemic and structural analysis, as well as the method of logical generalization, are employed in order to study the existing models of organizational maturity, to describe levels of organizational maturity, and finally to develop a set of methodological recommendations for achieving a higher level of organizational project maturity at a given enterprise. The results of the research showed that the core elements of project management system are methodological, organizational, programtechnical, and motivational components. Project management encompasses a wide range of issues connected with organizational structure, project team, communication management, project participants, etc. However, the fundamental basis for developing project management concept within a given enterprise starts with defining its level of organizational maturity. The present paper describes various models of organizational maturity (staged, continuous, petal-shaped and their common types (H. Кеrzner Organizational Maturity Model, Berkeley PM Maturity Model, Organizational Project Management Maturity Model, Portfolio, Program & Project Management Maturity Model. The analysis of available theoretic works showed that the notion “organizational project maturity” refers to the capability of an enterprise to select projects and manage them with the intention of achieving its strategic goals in the most effective way. Importantly, the level of maturity can be improved by means of formalizing the acquired knowledge, regulating project-related activities

  3. Economic Performance Analysis of National Research and Development Project

    Energy Technology Data Exchange (ETDEWEB)

    Kim, S. S.; Yun, S. W.; Kim, S. E. [KAERI, Daejeon (Korea, Republic of)

    2016-05-15

    There are a lot of differences between these two evaluation programs in terms of their main objectives, assessment items, and evaluation methods by item. When considering the recent evaluation trend of being more concerned with the objective and scientifically well-founded base of judgment than the qualitative results data, there seems to be much supplement and improvement points in both evaluation programs. Firstly, the MSIP's evaluation program which is known as 'The performance analysis of national R and D program in Korea is applying the principle of ex-post evaluation for the overall performances of R and D activities focusing on the scientific and technological outputs, economic effects, and social performances such as the training of science and engineering personnel. Its report has been done and published by the collaboration of MSIP and KISTEP(Korea Institute of Science and Technology Evaluation and Planning). There seems to be a trend that the economic contributions to the national economy and the industries by national R and D projects have been underestimated due to the difficulties of not presenting properly the reliable quantitative effects even though they have contributed not only to the real economy and economic growth but to the industrial productions and public benefits. The key reasons to this phenomenon might be the deficiency of perception for evaluation tools and methodologies development and the original difficulty of evaluation for R and D performances. Especially the evaluation results for national R and D projects could impact on the investment decision on the long-term national R and D program, with being based on the investment efficiency or the necessity and urgency which might be represented by evaluation results.

  4. Economic Performance Analysis of National Research and Development Project

    International Nuclear Information System (INIS)

    Kim, S. S.; Yun, S. W.; Kim, S. E.

    2016-01-01

    There are a lot of differences between these two evaluation programs in terms of their main objectives, assessment items, and evaluation methods by item. When considering the recent evaluation trend of being more concerned with the objective and scientifically well-founded base of judgment than the qualitative results data, there seems to be much supplement and improvement points in both evaluation programs. Firstly, the MSIP's evaluation program which is known as 'The performance analysis of national R and D program in Korea is applying the principle of ex-post evaluation for the overall performances of R and D activities focusing on the scientific and technological outputs, economic effects, and social performances such as the training of science and engineering personnel. Its report has been done and published by the collaboration of MSIP and KISTEP(Korea Institute of Science and Technology Evaluation and Planning). There seems to be a trend that the economic contributions to the national economy and the industries by national R and D projects have been underestimated due to the difficulties of not presenting properly the reliable quantitative effects even though they have contributed not only to the real economy and economic growth but to the industrial productions and public benefits. The key reasons to this phenomenon might be the deficiency of perception for evaluation tools and methodologies development and the original difficulty of evaluation for R and D performances. Especially the evaluation results for national R and D projects could impact on the investment decision on the long-term national R and D program, with being based on the investment efficiency or the necessity and urgency which might be represented by evaluation results

  5. Project Manager Performance and the Decision to Backsource the Project Management Office

    Science.gov (United States)

    Lively, William R.

    2014-01-01

    This paper reviews a management decision of an Information Technology Outsource (ITO) provider to backshore the management oversight of its Project Management Office (PMO) after only one year of offshore operations. Governance is a term used in project management to refer to management oversight. The review is a quantitative analysis of existing…

  6. Analysis of Correlations between the Level of Partnering Relations and their Influence on the Time, Cost, Quality and Safety of Implementation of Construction Projects

    Directory of Open Access Journals (Sweden)

    Radziszewska-Zielina Elżbieta

    2014-11-01

    Full Text Available The present paper uses the developed model of the influence of partnering relations on the time, cost, quality and safety of implementation of construction projects. On its basis, a questionnaire has been created and a preliminary survey has been conducted. The paper presents an analysis of correlations between the level of partnering relations in the context of the partnering measures indicated in the model and their influence on the time, cost, quality and safety of implementation of construction projects. The analysis was conducted based on the data collected in 52 construction projects. The values of the Spearman rank correlation coefficient and the Pearson product-moment correlation coefficient have been calculated for the examined relations. The analysis allowed for indicating the measures of partnering whose improvement most often brings benefits with regard to the time, cost, quality and safety of implementation of construction projects. Among the 80 analysed correlations, the ones identified as strong were: 15 relations connected with the time, 8 with the cost, 5 with the quality and 1 with the safety of implementation of construction projects.

  7. A comparative analysis of business structures suitable for farmer-owned wind power projects in the United States

    International Nuclear Information System (INIS)

    Bolinger, Mark; Wiser, Ryan

    2006-01-01

    For years, farmers in the United States have looked with envy on their European counterparts' ability to profitably farm the wind through ownership of distributed, utility-scale wind projects. Only within the past few years, however, has farmer- or community-owned wind power development become a reality in the United States. The primary hurdle to this type of development in the United States has been devising and implementing suitable business and legal structures that enable such projects to take advantage of tax-based federal incentives for wind power. This article discusses the limitations of such incentives in supporting farmer- or community-owned wind projects, describes four ownership structures that potentially overcome such limitations, and finally conducts comparative financial analysis on those four structures, using as an example a hypothetical 1.5 MW farmer-owned project located in the state of Oregon. We find that material differences in the competitiveness of each structure do exist, but that choosing the best structure for a given project will largely depend on the conditions at hand; e.g., the ability of the farmer(s) to utilize tax credits, preference for individual versus 'cooperative' ownership, and the state and utility service territory in which the project will be located

  8. RO1 Funding for Mixed Methods Research: Lessons learned from the Mixed-Method Analysis of Japanese Depression Project

    OpenAIRE

    Arnault, Denise Saint; Fetters, Michael D.

    2011-01-01

    Mixed methods research has made significant in-roads in the effort to examine complex health related phenomenon. However, little has been published on the funding of mixed methods research projects. This paper addresses that gap by presenting an example of an NIMH funded project using a mixed methods QUAL-QUAN triangulation design entitled “The Mixed-Method Analysis of Japanese Depression.” We present the Cultural Determinants of Health Seeking model that framed the study, the specific aims, ...

  9. Dependency Analysis Guidance. Nordic/German Working Group on Common cause Failure analysis. Phase 1 project report: Comparisons and application to test cases

    Energy Technology Data Exchange (ETDEWEB)

    Becker, Guenter (RISA Sicherheitsanalysen GmbH (DE)); Jaenkaelae, Kalle (Fortum Nuclear Services Oy (FI)); Johanson, Gunnar; Lindberg, Sandra (ES Konsult, Stockholm (SE)); Knochenhauer, Michael (Relcon Scandpower AB, Stockholm (SE)); Schubert, Bernd (Vattenfall Europe (DE)); Vaurio, Jussi (Prometh Solutions (FI)); Wohlstein, Ralf (E.ON Kernkraft, Maschinentechnik (DE))

    2007-10-15

    This report is part of the reporting from the European Working Group on CCF analysis (EWG), including members from Finland, Germany and Sweden. The project is planned in two phases with a reporting and progress evaluation before initiation of the second phase. Phase 1: Comparisons and application to test cases (2006). Phase 2: Development of harmonized approach and applications (2007). This report summarizes the work during the 1st phase of the project, which included the following main tasks: Task 1: Survey of databases, Task 2: Survey of methods for classification and quantification of CCF-events and description of these methods. Task 3: Classify events for application, using different approaches as recommended above. Task 4: Draw conclusions for harmonization

  10. Dependency Analysis Guidance. Nordic/German Working Group on Common cause Failure analysis. Phase 1 project report: Comparisons and application to test cases

    International Nuclear Information System (INIS)

    Becker, Guenter; Jaenkaelae, Kalle; Johanson, Gunnar; Lindberg, Sandra; Knochenhauer, Michael; Sc hubert, Bernd; Vaurio, Jussi; Wohlstei n, Ralf

    2007-10-01

    This report is part of the reporting from the European Working Group on CCF analysis (EWG), including members from Finland, Germany and Sweden. The project is planned in two phases with a reporting and progress evaluation before initiation of the second phase. Phase 1: Comparisons and application to test cases (2006). Phase 2: Development of harmonized approach and applications (2007). This report summarizes the work during the 1st phase of the project, which included the following main tasks: Task 1: Survey of databases, Task 2: Survey of methods for classification and quantification of CCF-events and description of these methods. Task 3: Classify events for application, using different approaches as recommended above. Task 4: Draw conclusions for harmonization

  11. Transport Project Evaluation

    DEFF Research Database (Denmark)

    Leleur, Steen

    1996-01-01

    Two main project evaluation approaches exist: cost-benefit analysis (CBA) and multi-criteria analysis (MCA). Related to a European road evaluation method (EURET 1.1) and the MCA-method, WARP, the paper proposes a set of so-called segregated investment return rates (SIRR) to integrate advantages...

  12. Supplement analysis, Southpoint power project

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-03-16

    The Calpine Corporation applied to interconnect its proposed power plant with the Western Area Power Administration`s (Western) Parker-Davis project in western Arizona. Western, as a major electric transmission system owner is required by existing policies and regulations, to provide access to its transmission system, when requested by an eligible organization. The proposed interconnection would integrate a major source of new generation into the Parker-Davis system which would allow Calpine to supply its power to the electric wholesale market. Based on this application, Western`s proposed action is to enter into an interconnection agreement with Calpine.

  13. YUCCA MOUNTAIN SITE CHARACTERIZATIONS PROJECT TUNNEL BORING MACHINE (TBM) SYSTEM SAFETY ANALYSIS

    International Nuclear Information System (INIS)

    1997-01-01

    The purpose of this analysis is to systematically identify and evaluate hazards related to the tunnel boring machine (TBM) used in the Exploratory Studies Facility (ESF) at the Yucca Mountain Site Characterization Project. This process is an integral part of the systems engineering process; whereby safety is considered during planning, design, testing, and construction. Since the TBM is an ''as built'' system, the MandO is conducting the System Safety Analysis during the construction or assembly phase of the TBM. A largely qualitative approach was used since a radiological System Safety Analysis is not required. The risk assessment in this analysis characterizes the accident scenarios associated with the TBM in terms of relative risk and includes recommendations for mitigating all identified risks. The priority for recommending and implementing mitigation control features is: (1) Incorporate measures to reduce risks and hazards into the system/subsystem/component design, (2) add safety features and capabilities to existing designs, and (3) develop procedures and conduct training to increase worker awareness of potential hazards, on methods to reduce exposure to hazards, and on the actions required to avoid accidents or correct hazardous conditions. The scope of this analysis is limited to the TBM during normal operations, excluding hazards occurring during assembly and test of the TBM or maintenance of the TBM equipment

  14. YUCCA MOUNTAIN SITE CHARACTERIZATIONS PROJECT TUNNEL BORING MACHINE (TBM) SYSTEM SAFETY ANALYSIS

    Energy Technology Data Exchange (ETDEWEB)

    N/A

    1997-02-19

    The purpose of this analysis is to systematically identify and evaluate hazards related to the tunnel boring machine (TBM) used in the Exploratory Studies Facility (ESF) at the Yucca Mountain Site Characterization Project. This process is an integral part of the systems engineering process; whereby safety is considered during planning, design, testing, and construction. Since the TBM is an ''as built'' system, the M&O is conducting the System Safety Analysis during the construction or assembly phase of the TBM. A largely qualitative approach was used since a radiological System Safety Analysis is not required. The risk assessment in this analysis characterizes the accident scenarios associated with the TBM in terms of relative risk and includes recommendations for mitigating all identified risks. The priority for recommending and implementing mitigation control features is: (1) Incorporate measures to reduce risks and hazards into the system/subsystem/component design, (2) add safety features and capabilities to existing designs, and (3) develop procedures and conduct training to increase worker awareness of potential hazards, on methods to reduce exposure to hazards, and on the actions required to avoid accidents or correct hazardous conditions. The scope of this analysis is limited to the TBM during normal operations, excluding hazards occurring during assembly and test of the TBM or maintenance of the TBM equipment.

  15. Project Documentation as a Risk for Public Projects

    Directory of Open Access Journals (Sweden)

    Vladěna Štěpánková

    2015-08-01

    Full Text Available Purpose of the article: The paper presents the different methodologies used for creating documentation and focuses on public projects and their requirements for this documentation. Since documentation is also incorporated in the overall planning of the project and its duration is estimated using expert qualified estimate, can any change in this documentation lead to project delays, or increase its cost as a result of consuming administration, and therefore the documentation is seen as a risk, which may threaten the project as a public contract by which a company trying to achieve and obtains it, and generally any project. Methodology/methods: There are used methods of obtaining information in this paper. These are mainly structured interviews in combination with a brainstorming, furthermore also been used questionnaire for companies dealing with public procurement. As a data processing program was used MS Excel and basic statistical methods based on regression analysis. Scientific aim: The article deals with the construction market in the Czech Republic and examines the impact of changes in project documentation of public projects on their turnover. Findings: In this paper we summarize the advantages and disadvantages of having project documentation. In the case of public contracts and changes in legislation it is necessary to focus on creating documentation in advance, follow the new requirements and try to reach them in the shortest possible time. Conclusions: The paper concludes with recommendations on how to proceed, if these changes and how to reduce costs, which may cause the risk of documentation.

  16. Project-based knowledge in organizing open innovation

    CERN Document Server

    Comacchio, Anna; Pizzi, Claudio

    2014-01-01

    Enriching understanding of the current theoretical debate on project-based open innovation, ‘Project-based Knowledge in Organizing Open Innovation’ draws on innovation management literature and knowledge-based perspectives to investigate the relationship between knowledge development at project level and the strategic organization of open innovation. Addressing the still open issue of how the firm level should be complemented by studies at the project level of analysis, this book provides theoretical and empirical arguments on the advantages of a more fine-grained level of analysis to understand how firms organize their innovation processes across boundaries. The book also addresses the emerging interest in the management literature on project-based organizations, and on the relevance of project forms of organizing in a knowledge-based economy. Through field research in different industrial settings , this book provides empirical evidence on how firms design open innovation project-by-project and it will ...

  17. Creatvity in Project Work

    DEFF Research Database (Denmark)

    Bjørner, Thomas; Kofoed, Lise B.; Bruun-Pedersen, Jon Ram

    2012-01-01

    that they are creative during all stages in the project work. However, it is also significant that the Medialogy students believe that they are more creative in the beginning of their projects and during the design and implementation stages, whereas the analysis is a less creative part. In general, the Medialogy...

  18. Usage Patterns of Electric Bicycles: An Analysis of the WeBike Project

    Directory of Open Access Journals (Sweden)

    Christian Gorenflo

    2017-01-01

    Full Text Available This paper presents an analysis of data collected through the Waterloo WeBike project: a field trial in which over 30 sensor-equipped electric bicycles (e-bikes were given to members of the University of Waterloo for personal use. Our dataset includes e-bike trips and battery charging sessions spanning nearly three years, from summer 2014 until spring 2017. We also conducted three surveys both before and during the trial. Our main findings were that the primary purpose of the e-bikes in our trial was for commuting, with most trips lasting less than 20 minutes and most trips taking place in the summer months. Our battery charging analysis revealed no evidence of range anxiety, and our analysis of survey results showed little correlation between anticipated and actual use. Furthermore, when asked about their opinions about various modes of transportation, our participants rated regular bicycles higher than e-bikes even after becoming familiar with e-bikes through the field trial. Based on our analysis, we draw several conclusions, including the fact that the general population in Canada is still unaware of e-bikes and their potential. Moreover, e-bike manufacturers should target sales to nonbike users, such as seniors, rather than trying to displace sales of regular bicycles.

  19. An Inquiry-Based Project Focused on the X-Ray Powder Diffraction Analysis of Common Household Solids

    Science.gov (United States)

    Hulien, Molly L.; Lekse, Jonathan W.; Rosmus, Kimberly A.; Devlin, Kasey P.; Glenn, Jennifer R.; Wisneski, Stephen D.; Wildfong, Peter; Lake, Charles H.; MacNeil, Joseph H.; Aitken, Jennifer A.

    2015-01-01

    While X-ray powder diffraction (XRPD) is a fundamental analytical technique used by solid-state laboratories across a breadth of disciplines, it is still underrepresented in most undergraduate curricula. In this work, we incorporate XRPD analysis into an inquiry-based project that requires students to identify the crystalline component(s) of…

  20. Improving Students' Argumentation Skills through a Product Life-Cycle Analysis Project in Chemistry Education

    Science.gov (United States)

    Juntunen, M. K.; Aksela, M. K.

    2014-01-01

    The aim of the study discussed in this paper was to link existing research about the argumentation skills of students to the teaching of life-cycle analysis (LCA) in order to promote an evidence-based approach to the teaching of and learning about materials used in consumer products. This case-study is part of a larger design research project that…

  1. The Three Gorges Project: How sustainable?

    Science.gov (United States)

    Kepa Brian Morgan, Te Kipa; Sardelic, Daniel N.; Waretini, Amaria F.

    2012-08-01

    SummaryIn 1984 the Government of China approved the decision to construct the Three Gorges Dam Project, the largest project since the Great Wall. The project had many barriers to overcome, and the decision was made at a time when sustainability was a relatively unknown concept. The decision to construct the Three Gorges Project remains contentious today, especially since Deputy Director of the Three Gorges Project Construction Committee, Wang Xiaofeng, stated that "We absolutely cannot relax our guard against ecological and environmental security problems sparked by the Three Gorges Project" (Bristow, 2007; McCabe, 2007). The question therefore was posed: how sustainable is the Three Gorges Project? Conventional approaches to sustainability assessment tend to use monetary based assessment aligned to triple bottom line thinking. That is, projects are evaluated as trade-offs between economic, environmental and social costs and benefits. The question of sustainability is considered using such a traditional Cost-Benefit Analysis approach, as undertaken in 1988 by a CIPM-Yangtze Joint Venture, and the Mauri Model Decision Making Framework (MMDMF). The Mauri Model differs from other approaches in that sustainability performance indicators are considered independently from any particular stakeholder bias. Bias is then introduced subsequently as a sensitivity analysis on the raw results obtained. The MMDMF is unique in that it is based on the Māori concept of Mauri, the binding force between the physical and the spiritual attributes of something, or the capacity to support life in the air, soil, and water. This concept of Mauri is analogous to the Chinese concept of Qi, and there are many analogous concepts in other cultures. It is the universal relevance of Mauri that allows its use to assess sustainability. This research identified that the MMDMF was a strong complement to Cost-Benefit Analysis, which is not designed as a sustainability assessment tool in itself. The

  2. Managing projects using a project management approach

    Directory of Open Access Journals (Sweden)

    Marko D. Andrejić

    2011-04-01

    these objectives should be like. Requirements and effects of the application of project management The goal of the project management methodology is to assist the manager in all of these elements, but also to provide a uniform way of evaluating his performance as an objective comparison of indicators in all projects that are implemented in the system. Project management methodology Efficient business operations and fulfilling the requests of users, or buyers if business is done for the third parties, require modern planning and management of projects using computers and appropriate software. Given that the project management with the help of network models requires frequent and rapid processing of large amount of data, it is obvious that the application of computers in this area is of utmost importance. System of reporting on project implementation To achieve effective monitoring, control and implementation of control actions, it is necessary to organize an effective reporting system that will provide timely and realistic information about the real state of the project, in terms of job performing time, the resources spent and the costs of project implementation. Concept of risk management In any project there are many different risk events by type, the probability of appearance, manner and size of the impact of the project. The process of testing the nature of risk events in the project as well as their potential impact on the outcome of the project and their interdependence are realized through the risk analysis. Conclusion Methodologies of project management surged from these differences, when it became apparent that a unified approach to the problem of project managing does not meet the unique project requirements. Taking into account that in the future projects will become more complex and that the methodology of project management will be required to deal with such projects, a proper selection of methodology within the organization is extremely important.

  3. An Analysis Of The Benefits And Application Of Earned Value Management (EVM) Project Management Techniques For Dod Programs That Do Not Meet Dod Policy Thresholds

    Science.gov (United States)

    2017-12-01

    VALUE MANAGEMENT (EVM) PROJECT MANAGEMENT TECHNIQUES FOR DOD PROGRAMS THAT DO NOT MEET DOD POLICY THRESHOLDS December 2017 By: Randy Schneider...Joint applied project 4. TITLE AND SUBTITLE AN ANALYSIS OF THE BENEFITS AND APPLICATION OF EARNED VALUE MANAGEMENT (EVM) PROJECT MANAGEMENT ...performance reporting. The immediate objective of this research project was to examine the question: Can the application of EVM-Lite project management

  4. ANALYSIS OF TIME MANAGEMENT APPLIED TO A PROJECT OF OIL

    Directory of Open Access Journals (Sweden)

    Arielle Meireles Moreira

    2011-05-01

    Full Text Available Project management (PM efficient results in increased probability of success of activities and its completion as time, cost and scope planned. Since this triad (time, cost and scope is connected, any changes will affect within the scope and increase the cost of the project. This was a case study in a large company exploiting oil and gas. The research is focused on time management (TM in an oil project in order to examine the schedule of activities according to the time tool, the Gantt Chart in MS Project 2003 software. The study design was selected due to its long delay in implementation and lack of planning and managing this. By analyzing the Gantt Chart, activities were identified late. With this, the problems that caused delays were surveyed (the project documents and their parents questioned. Thus, it was proposed improvements to an effective control of time on the problems encountered.

  5. Project Cost Estimation for Planning

    Science.gov (United States)

    2010-02-26

    For Nevada Department of Transportation (NDOT), there are far too many projects that ultimately cost much more than initially planned. Because project nominations are linked to estimates of future funding and the analysis of system needs, the inaccur...

  6. Mobility chains analysis of technologies for passenger cars and light duty vehicles fueled with biofuels : application of the Greet model to project the role of biomass in America's energy future (RBAEF) project.

    Energy Technology Data Exchange (ETDEWEB)

    Wu, M.; Wu, Y.; Wang, M; Energy Systems

    2008-01-31

    The Role of Biomass in America's Energy Future (RBAEF) is a multi-institution, multiple-sponsor research project. The primary focus of the project is to analyze and assess the potential of transportation fuels derived from cellulosic biomass in the years 2015 to 2030. For this project, researchers at Dartmouth College and Princeton University designed and simulated an advanced fermentation process to produce fuel ethanol/protein, a thermochemical process to produce Fischer-Tropsch diesel (FTD) and dimethyl ether (DME), and a combined heat and power plant to co-produce steam and electricity using the ASPEN Plus{trademark} model. With support from the U.S. Department of Energy (DOE), Argonne National Laboratory (ANL) conducted, for the RBAEF project, a mobility chains or well-to-wheels (WTW) analysis using the Greenhouse gases, Regulated Emissions, and Energy use in Transportation (GREET) model developed at ANL. The mobility chains analysis was intended to estimate the energy consumption and emissions associated with the use of different production biofuels in light-duty vehicle technologies.

  7. [''R"--project for statistical computing

    DEFF Research Database (Denmark)

    Dessau, R.B.; Pipper, Christian Bressen

    2008-01-01

    An introduction to the R project for statistical computing (www.R-project.org) is presented. The main topics are: 1. To make the professional community aware of "R" as a potent and free software for graphical and statistical analysis of medical data; 2. Simple well-known statistical tests are fai...... are fairly easy to perform in R, but more complex modelling requires programming skills; 3. R is seen as a tool for teaching statistics and implementing complex modelling of medical data among medical professionals Udgivelsesdato: 2008/1/28......An introduction to the R project for statistical computing (www.R-project.org) is presented. The main topics are: 1. To make the professional community aware of "R" as a potent and free software for graphical and statistical analysis of medical data; 2. Simple well-known statistical tests...

  8. IMPORTANCE OF EARNED VALUE METHOD (EVA IN THE PERFORMANCE ANALYSIS OF PROJECTS

    Directory of Open Access Journals (Sweden)

    MARGARITA JANESKA

    2016-04-01

    Full Text Available The economics of the projects is an important process in the project management. Effective control of projects is based on appropriate methods for monitoring, and the entire project, the timetable, cost, quality and risk. Unlike accounting aspects in project management are looking for information that allow insight into the status and trends of financial progress of the project. Such information provide a method of earned value. It is a key component for assessing the actual performance of the project. The method of earned value is a better indicator of the progress of the project in comparison to the classical method of comparing planned and actual costs. This method shows the profit in relation to actual costs at a specific time point. This method is the basis for calculating the index of the project performance. In this sense, MS Project provides many opportunities for quality control and monitoring of the realization of the projects. In this study will be described the architecture of this method, outlined the benefits of the application of this method, and the basic criteria that should satisfy project management to be able to apply it.

  9. ASP project. Dissolved oxygen issues in ASP project

    Directory of Open Access Journals (Sweden)

    M.Y. Bondar

    2018-03-01

    Full Text Available The article presents the latest results of studies about the effect of dissolved oxygen on the efficiency of the ASP flooding project implemented by Salym Petroleum Development N.V.. Pilot project on experimental injection of anionic surfactant solutions, soda and polymer into the reservoir for enhanced oil recovery (ASP project has been implemented since 2016. The stability of one of the components of the ASP polymer is strongly dependent on the presence of iron, stiffness cations and dissolved oxygen in the water. Since the polymer is used for injection at two stages of the project, which are essential and the longest, at the design stage of ASP project a whole complex of polymer protection had been established against negative factors, in particular from the influence of oxygen, which causes not only oxygen corrosion but also irreversible destruction polymer chains. In the paper, studies on the stability of polymer solutions are described, an analysis of viscosity loss with time in the presence of iron and oxygen for polymer solutions is carried out. The choice of chemical deoxygenation method for the control of dissolved oxygen is substantiated. The program of laboratory studies of the ASP project and the analytical instruments used are described. The technological scheme of the ASP process is presented, and recommendations for the implementation of the technology are given.

  10. DOE responses to Ecology review comments for ''Sampling and analysis plans for the 100-D Ponds voluntary remediation project''

    International Nuclear Information System (INIS)

    1996-01-01

    The Sampling and Analysis Plan describes the sampling and analytical activities which will be performed to support closure of the 100-D Ponds at the Hanford Reservation. This report contains responses by the US Department of Energy to Ecology review for ''Sampling and Analysis Plan for the 100-D Ponds Voluntary Remediation Project.''

  11. Nurse managers' challenges in project management.

    Science.gov (United States)

    Suhonen, Marjo; Paasivaara, Leena

    2011-11-01

    To analyse the challenges that nurse managers meet in project management. Project management done by nurse managers has a significant role in the success of projects conducted in work units. The data were collected by open interviews (n = 14). The participants were nurse managers, nurses and public health nurses. Data analysis was carried out using qualitative content analysis. The three main challenges nurse managers faced in project management in health-care work units were: (1) apathetic organization and management, (2) paralysed work community and (3) cooperation between individuals being discouraged. Nurse managers' challenges in project management can be viewed from the perspective of the following paradoxes: (1) keeping up projects-ensuring patient care, (2) enthusiastic management-effective management of daily work and (3) supporting the work of a multiprofessional team-leadership of individual employees. It is important for nurse managers to learn to relate these paradoxes to one another in a positive way. Further research is needed, focusing on nurse managers' ability to promote workplace spirituality, nurse managers' emotional intelligence and their enthusiasm in small projects. © 2011 Blackwell Publishing Ltd.

  12. Ranking the Project Management Success Factors for Construction Project in South India

    Science.gov (United States)

    Aneesha, K.; Haridharan, M. K.

    2017-07-01

    In Today’s construction industry, to achieve a greater advantage over the firms, success of each project and efficiency is required. Effective Project Management overcomes these types of challenges. This study identifies the success factors which are important for project management in construction project success. From the literature review, 26 factors were found to be critical. Project managers, construction managers, civil engineers, contractors and site engineers were the respondents. After analyzing the data in SPSS software, the dominant factors from the regression analysis are top management support, competent project team, abilities to solve problems, realistic cost and time estimates, information/communication, competency of the project manager are the 6 factors out of 12 in 26 factors. Effective communication between stakeholders got highest priority and client involvement, good leadership, clarity of project goals got second priority. Informal communication gives better results compared to formal communications like written formats. To remove communication barrier with the stakeholders, informal communication like speaking face-to-face with the language this fits for the stakeholders.

  13. Projects development for mining-metallurgical units for production of uranium concentrates. An analysis an a methodology

    International Nuclear Information System (INIS)

    Ajuria G, S.; Blanco P, B.; Manzanera Q, C.; Pena A, J.

    1978-07-01

    An analysis and a methodology for the complete development of a mining- metallurgist project is presented, from the sampling and the evaluation of a deposit until the outburst of a metallurgical plant. The main objectives of this work are three: On one hand it is to establish a methodology for standardize the internal activities of the Sub management of Benefits. It is convenient standardize the experimental procedures, the evaluation approaches and the form of presentation of results so that they are directly comparable and that it is easy their interpretation and use. Given the nature so variable of the minerals this document cannot be but that a guide and it is indispensable that in all moment the personnel that develops these activities uses his knowledge, experience and professional approach to obtain the best results. On the other hand it is to establish a base to facilitate the coordination of the activities of the Sub management of Benefit with other work groups, inside of and outside of the INEN that should collaborate in the projects. Finally it is to present a vision of group of the whole project like reference base for the participant personnel. Many of the specialists that contribute to the project would not be metallurgists, but rather they practice other disciplines. It is therefore convenient to facilitate the one that are formed an image of the complete project. (Author)

  14. PROJECT SCOPE MANAGEMENT PROCESS

    Directory of Open Access Journals (Sweden)

    Yana Derenskaya

    2018-01-01

    Full Text Available The purpose of the article is to define the essence of project scope management process, its components, as well as to develop an algorithm of project scope management in terms of pharmaceutical production. Methodology. To carry out the study, available information sources on standards of project management in whole and elements of project scope management in particular are analysed. Methods of system and structural analysis, logical generalization are used to study the totality of subprocesses of project scope management, input and output documents, and to provide each of them. Methods of network planning are used to construct a precedence diagram of project scope management process. Results of the research showed that components of the project scope management are managing the scope of the project product and managing the content of project work. It is the second component is investigated in the presented work as a subject of research. Accordingly, it is defined that project scope management process is to substantiate and bring to the realization the necessary amount of work that ensures the successful implementation of the project (achievement of its goal and objectives of individual project participants. It is also determined that the process of managing the project scope takes into account the planning, definition of the project scope, creation of the structure of project work, confirmation of the scope and management of the project scope. Participants of these subprocesses are: customer, investor, and other project participants – external organizations (contractors of the project; project review committee; project manager and project team. It is revealed that the key element of planning the project scope is the formation of the structure of design work, the justification of the number of works, and the sequence of their implementation. It is recommended to use the following sequence of stages for creating the structure of project work

  15. Integrating multicriteria evaluation and stakeholders analysis for assessing hydropower projects

    International Nuclear Information System (INIS)

    Rosso, M.; Bottero, M.; Pomarico, S.; La Ferlita, S.; Comino, E.

    2014-01-01

    The use of hydroelectric potential and the protection of the river ecosystem are two contrasting aspects that arise in the management of the same resource, generating conflicts between different stakeholders. The purpose of the paper is to develop a multi-level decision-making tool, able to support energy planning, with specific reference to the construction of hydropower plants in mountain areas. Starting from a real-world problem concerning the basin of the Sesia Valley (Italy), an evaluation framework based on the combined use of Multicriteria Evaluation and Stakeholders Analysis is proposed in the study. The results of the work show that the methodology is able to grant participated decisions through a multi-stakeholders traceable and transparent assessment process, to highlight the important elements of the decision problem and to support the definition of future design guidelines. - Highlights: • The paper concerns a multi-level decision-making tool able to support energy planning. • The evaluation framework is based on the use of AHP and Stakeholders Analysis. • Hydropower projects in the Sesia Valley (Italy) are evaluated and ranked in the study. • Environmental, economic, technical and sociopolitical criteria have been considered. • 42 stakeholder groups have been included in the evaluation

  16. Environmental impacts of wind-energy projects

    National Research Council Canada - National Science Library

    Committee on Environmental Impacts of Wind Energy Projects; National Research Council; Division on Earth and Life Studies; National Research Council

    2007-01-01

    .... Environmental Impacts of Wind-Energy Projects offers an analysis of the environmental benefits and drawbacks of wind energy, along with an evaluation guide to aid decision-making about projects...

  17. Radiochemistry Project

    International Nuclear Information System (INIS)

    Anon.

    Researches carried out in the 'Radiochemistry Project' of the Agricultural Nuclear Energy Center, Piracicaba, Sao Paulo State, Brazil, are described. Such researches comprise: dosimetry and radiological protection; development of techniques and methods of chemical analysis and radiochemistry. (M.A.) [pt

  18. Project W-320 Tank 106-C waste retrieval study analysis session report

    International Nuclear Information System (INIS)

    Bailey, J.W.

    1998-01-01

    This supporting document has been prepared to make the Kaiser Engineers Hanford Company Project W-320 Tank 106-C Waste Retrieval Study Analysis Session Report readily retrievable. This facilitated session was requested by Westinghouse Hanford Company (WHC) to review the characterization data and select the best alternatives for a double-shell receiver tank and for a sluicing medium for Tank 106-C waste retrieval. The team was composed of WHC and Kaiser Engineers Hanford Company (KEH) personnel knowledgeable about tank farm operations, tank 106-C requirements, tank waste characterization and analysis, and chemical processing. This team was assembled to perform a structured decision analysis evaluation and recommend the best alternative-destination double-shell tank between tanks 101-AY and 102-AY, and the best alternative sluicing medium among dilute complexant (DC), dilute noncomplexant (DNC), and water. The session was facilitated by Richard Harrington and Steve Bork of KEH and was conducted at the Bookwalter Winery in Richland from 7:30 a.m. to 4:00 p.m. from July 27 through July 29, 1993. Attachment 1 (Scope Statement Sheet) identifies the team members, scope, objectives, and deliverables for the session

  19. Fire hazards analysis for the replacement cross-site transfer system, project W-058

    International Nuclear Information System (INIS)

    Sepahpur, J.B.

    1996-01-01

    The fire hazards analysis assess the risk from fire and determines compliance with the applicable criteria of DOE 5480.7A, DOE 6430.1A, and RLID 5480.7. (Project W-058 will provide encased pipelines to connect the SY Tank Farms in 200 West Area with the tank farms in 200 East Area via an interface with the 244-A lift station. Function of the cross-site transfer system will be to transfer radioactive waste from the SY Tank Farm to treatment, storage, and disposal facilities in 200 East Area.)

  20. The process of life-cycle cost analysis on the Fernald Environmental Management Project

    International Nuclear Information System (INIS)

    Chang, D.Y.; Jacoboski, J.A.; Fisher, L.A.; Beirne, P.J.

    1993-01-01

    The Estimating Services Department of the Fernald Environmental Restoration Management Corporation (FERMCO) is formalizing the process of life-cycle cost analysis (LCCA) for the Fernald Environmental Management Project (FEMP). The LCCA process is based on the concepts, principles, and guidelines described by applicable Department of Energy's (DOE) orders, pertinent published literature, and the National Bureau of Standards handbook 135. LCC analyses will be performed following a ten-step process on the FEMP at the earliest possible decision point to support the selection of the least-cost alternatives for achieving the FERMCO mission

  1. Solar particle radiation storms forecasting and analysis the HESPERIA HORIZON 2020 project and beyond

    CERN Document Server

    Crosby, Norma

    2018-01-01

    Solar energetic particles (SEPs) emitted from the Sun are a major space weather hazard motivating the development of predictive capabilities. This book presents the results and findings of the HESPERIA (High Energy Solar Particle Events forecasting and Analysis) project of the EU HORIZON 2020 programme. It discusses the forecasting operational tools developed within the project, and presents progress to SEP research contributed by HESPERIA both from the observational as well as the SEP modelling perspective. Using multi-frequency observational data and simulations HESPERIA investigated the chain of processes from particle acceleration in the corona, particle transport in the magnetically complex corona and interplanetary space, to the detection near 1 AU. The book also elaborates on the unique software that has been constructed for inverting observations of relativistic SEPs to physical parameters that can be compared with spac e-borne measurements at lower energies. Introductory and pedagogical material incl...

  2. NODC Standard Product: C-CAP Coastal Change Analysis Project - St. Croix estuary region (1985 - 1992) (NODC Accession 0090142)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The Coastal Change Analysis Project St. Croix Estuary Region CD-ROM data set uses Landsat Thematic Mapper (TM) imagery from 1985 to 1992 to provide a regional change...

  3. Sludge Treatment Project Engineered Container Retrieval And Transfer System Preliminary Design Hazard Analysis Supplement 1

    International Nuclear Information System (INIS)

    Franz, G.R.; Meichle, R.H.

    2011-01-01

    This 'What/If' Hazards Analysis addresses hazards affecting the Sludge Treatment Project Engineered Container Retrieval and Transfer System (ECRTS) NPH and external events at the preliminary design stage. In addition, the hazards of the operation sequence steps for the mechanical handling operations in preparation of Sludge Transport and Storage Container (STSC), disconnect STSC and prepare STSC and Sludge Transport System (STS) for shipping are addressed.

  4. Security Risk Assessment in Software Development Projects

    OpenAIRE

    Svendsen, Heidi

    2017-01-01

    Software security is increasing in importance, linearly with vulnerabilities caused by software flaws. It is not possible to spend all the project s resources on software security. To spend the resources given to security in an effective way, one should know what is most important to protect. By performing a risk analysis the project know which vulnerabilities they face. A risk analysis will prioritise the vulnerabilities, and when the vulnerabilities are prioritised the project know where th...

  5. UMTRA project water sampling and analysis plan, Mexican Hat, Utah

    International Nuclear Information System (INIS)

    1994-04-01

    The Mexican Hat, Utah, Uranium Mill Tailings Remedial Action (UMTRA) Project site is a former uranium mill that is undergoing surface remediation in the form of on-site tailings stabilization. Contaminated surface materials from the Monument Valley, Arizona, UMTRA Project site have been transported to the Mexican Hat site and are being consolidated with the Mexican Hat tailings. The scheduled completion of the tailings disposal cell is August 1995. Water is found in two geologic units at the site: the Halgaito Shale Formation and the Honaker Trail Formation. The tailings rest on the Halgaito Shale, and water contained in that unit is a result of milling activities and, to a lesser extent, water released from the tailings from compaction during remedial action construction of the disposal cell. Water in the Halgaito Shale flows through fractures and discharges at seeps along nearby arroyos. Flow from the seeps will diminish as water drains from the unit. Ground water in the lower unit, the Honaker Trail Formation, is protected from contamination by an upward hydraulic gradient. There are no nearby water supply wells because of widespread poor background ground water quality and quantity, and the San Juan River shows no impacts from the site. This water sampling and analysis plan (WSAP) recommends sampling six seeps and one upgradient monitor well compared in the Honaker Trail Formation. Samples will be taken in April 1994 (representative of high group water levels) and September 1994 (representative of low ground water levels). Analyses will be performed on filtered samples for plume indicator parameters

  6. Stress analysis of HLW containers. Preliminary ring test exercise Compas project

    International Nuclear Information System (INIS)

    1989-01-01

    This document describes the series of experiments and associated calculations performed as the Compas preliminary ring test exercise. A number of mild steel rings, representative of sections through HLW containers, some notched and pre-cracked, were tested in compression right up to and beyond their ultimate load. The Compas project partners independently modelled the behaviour of these rings using their finite element codes. Four different ring types were tested, and each test was repeated three times. For three of the ring types, the three test repetitions gave identical results. The fourth ring, which was not modelled by the partners, had a 4 mm thick layer of weld metal deposited on its surface. The three tests on this ring did not give identical results and suggested that the effect of welding methods should be addressed at a later stage of the project. Fracture was not found to be a significant cause of ring failure. The results of the ring tests were compared with the partners predictions, and additionally some time was spent assessing where the use of the codes could be improved. This exercise showed that the partners codes have the ability to produce results within acceptable limits. Most codes were unable to model stable crack growth. There were indications that some codes would not be able to cope with a significantly more complex three-dimensional analysis

  7. Who gains? allocation of freight transport user benefits from international infrastructure projects in multicountry cost-benefit analysis

    DEFF Research Database (Denmark)

    Fosgerau, Mogens; Kristensen, Niels Buus

    2005-01-01

    A public decision by several countries on whether to cofinance an international infrastructure project is the subject of a cost-benefit analysis (CBA). The CBA elements are broken out and analyzed for each country. The issue of freight user benefits is discussed, and results are derived from...

  8. Analysis model for the physical dimension in the environmental studies of electric transmission projects

    International Nuclear Information System (INIS)

    Garcia Gomez; Maria Aleyda; Caballero Acosta, Humberto

    2001-01-01

    This study makes a description and analysis of the physical aspects of the environment, which are contemplated, in the environmental studies of the projects of high voltage for electric transmission lines. Its meaning and out reach are defined in this projects, in its different phases of implementation; that is in the stages of design, construction and operation, making proposals to improve the adequate incorporation of physical dimension in the environmental activities. A very important aspect, worked out in the investigation, has to do with the way as this dimension is described in the real terms of reference for EIA of the Ministry of Environment; that is why it is analysed and some elements are proposed which are to correct and to articulate properly the information in these studies, because some problems were found in the articulation and contents of the physical aspects in the studies of environmental impact (EIA). Another very important aspect, which was obtained with this research, is the methodological proposal for the integration of the components of the physical dimension in which s ynthesis units are defined in different scales for the integration of those components. These facts will facilitate a better understanding of the natural processes in the areas of influence of the projects and a better understanding of the reciprocal relations between the project and the physical surroundings. In the process of searching a methodology for integration of the components of the physical dimension it is hoped that the studies be more congruent from the environmental point of view

  9. Progress and Failure of Repository Projects for Radioactive Waste - a Comparative Analysis of Turning Points, Deadlock and Ways to get out

    Energy Technology Data Exchange (ETDEWEB)

    Barth, Regine; Kallenbach-Herbert, Beate (Environmental Law and Nuclear Engineering and Governance Div., Facility Safety Div., Oeko-Institut e.V. Darmstadt (Germany)), e-mail: r.barth@oeko.de

    2009-12-15

    The examples of factors that may support or obstruct a disposal process give an overview of results from empirical studies with regard to the selected issues in site selection and approval procedure and public participation. They reveal how experience from disposal projects in different countries and from other large infrastructure projects may contribute to the shaping of national disposal projects. As was to be expected project specific features limit the level of detail with which factors of success or failure can be described. On the other hand a relatively large number of factors on a generic level can be identified. They give a clear indication as to which issues are important for the successful implementation of a disposal project for high active waste. The project specific implementation of generic success factors on the national level requires an additional step of analysis. In that step a detailed adaption under consideration of the specific situation and circumstances of a project can be performed

  10. Progress and Failure of Repository Projects for Radioactive Waste - a Comparative Analysis of Turning Points, Deadlock and Ways to get out

    International Nuclear Information System (INIS)

    Barth, Regine; Kallenbach-Herbert, Beate

    2009-12-01

    The examples of factors that may support or obstruct a disposal process give an overview of results from empirical studies with regard to the selected issues in site selection and approval procedure and public participation. They reveal how experience from disposal projects in different countries and from other large infrastructure projects may contribute to the shaping of national disposal projects. As was to be expected project specific features limit the level of detail with which factors of success or failure can be described. On the other hand a relatively large number of factors on a generic level can be identified. They give a clear indication as to which issues are important for the successful implementation of a disposal project for high active waste. The project specific implementation of generic success factors on the national level requires an additional step of analysis. In that step a detailed adaption under consideration of the specific situation and circumstances of a project can be performed

  11. The Impact of Wind Power Projects on Residential Property Values in the United States: A Multi-Site Hedonic Analysis

    Energy Technology Data Exchange (ETDEWEB)

    Hoen, Ben [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Wiser, Ryan [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Cappers, Peter [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Thayer, Mark [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Sethi, Gautam [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2009-12-01

    This report uses statistical analysis to evaluate the impact of wind power projects on property values, and fails to uncovers conclusive evidence of the existence of any widespread property value impacts.

  12. MORE. Management of Requirements in NPP modernisation projects - Project report 2005

    International Nuclear Information System (INIS)

    Thunem, A.P.J.; Fredriksen, R.; Thunem, H.P.J.; Ventae, O.; Valkonen, J.; Holmberg, J.E.

    2006-04-01

    The overall objective of the project MORE is to improve the means for managing the large amounts of evolving requirements in Nordic NPP modernisation projects. In accordance to this objective, the activity will facilitate the industrial utilisation of the research results from the project TACO. On the basis of experiences in the Nordic countries, the overall aim of the TACO project has been to identify the best practices and most important criteria for ensuring effective communication in relation to requirements elicitation and analysis, understandability of requirements to all parties, and traceability of requirements. The project resulted in the development of a traceability model for handling requirements from their origins and through their final shapes. Particular emphasis for the MORE project in 2005 was put on utilising a prototype of a tool (TRACE) intended to support an adopted approach to dependable requirements engineering, suitable for modelling and handling large amounts of requirements related to all stages of the systems development process and not only those traditionally including requirements at high-level stages. (au)

  13. MORE. Management of Requirements in NPP modernisation projects - Project report 2005

    Energy Technology Data Exchange (ETDEWEB)

    Thunem, A.P.J.; Fredriksen, R.; Thunem, H.P.J. [IFE (Norway); Ventae, O.; Valkonen, J.; Holmberg, J.E. [VTT Technical Research Centre of Finland (Finland)

    2006-04-15

    The overall objective of the project MORE is to improve the means for managing the large amounts of evolving requirements in Nordic NPP modernisation projects. In accordance to this objective, the activity will facilitate the industrial utilisation of the research results from the project TACO. On the basis of experiences in the Nordic countries, the overall aim of the TACO project has been to identify the best practices and most important criteria for ensuring effective communication in relation to requirements elicitation and analysis, understandability of requirements to all parties, and traceability of requirements. The project resulted in the development of a traceability model for handling requirements from their origins and through their final shapes. Particular emphasis for the MORE project in 2005 was put on utilising a prototype of a tool (TRACE) intended to support an adopted approach to dependable requirements engineering, suitable for modelling and handling large amounts of requirements related to all stages of the systems development process and not only those traditionally including requirements at high-level stages. (au)

  14. Power spectrum analysis of the x-ray scatter signal in mammography and breast tomosynthesis projections.

    Science.gov (United States)

    Sechopoulos, Ioannis; Bliznakova, Kristina; Fei, Baowei

    2013-10-01

    power spectrum reflected a fast drop-off with increasing spatial frequency, with a reduction of four orders of magnitude by 0.1 lp/mm. The β values for the scatter signal were 6.14 and 6.39 for the 0° and 30° projections, respectively. Although the low-frequency characteristics of scatter in mammography and breast tomosynthesis were known, a quantitative analysis of the frequency domain characteristics of this signal was needed in order to optimize previously proposed software-based x-ray scatter reduction algorithms for these imaging modalities.

  15. Supplement to the UMTRA project water sampling and analysis plan, Slick Rock, Colorado

    International Nuclear Information System (INIS)

    1995-09-01

    The water sampling and analysis plan (WSAP) provides the regulatory and technical basis for ground water and surface water sampling at the Uranium Mill Tailings Remedial Action (UMTRA) Project Union Carbide (UC) and North Continent (NC) processing sites and the Burro Canyon disposal site near Slick Rock, Colorado. The initial WSAP was finalized in August 1994 and will be completely revised in accordance with the WSAP guidance document (DOE, 1995) in late 1996. This version supplements the initial WSAP, reflects only minor changes in sampling that occurred in 1995, covers sampling scheduled for early 1996, and provides a preliminary projection of the next 5 years of sampling and monitoring activities. Once surface remedial action is completed at the former processing sites, additional and more detailed hydrogeologic characterization may be needed to develop the Ground Water Program conceptual ground water model and proposed compliance strategy. In addition, background ground water quality needs to be clearly defined to ensure that the baseline risk assessment accurately estimated risks from the contaminants of potential concern in contaminated ground water at the UC and NC sites

  16. Supplement to the UMTRA Project water sampling and analysis plan, Mexican Hat, Utah

    International Nuclear Information System (INIS)

    1995-09-01

    This water sampling and analysis plan (WSAP) supplement supports the regulatory and technical basis for water sampling at the Mexican Hat, Utah, Uranium Mill Tailings Remedial Action (UMTRA) Project site, as defined in the 1994 WSAP document for Mexican Hat (DOE, 1994). Further, the supplement serves to confirm our present understanding of the site relative to the hydrogeology and contaminant distribution as well as our intention to continue to use the sampling strategy as presented in the 1994 WSAP document for Mexican Hat. Ground water and surface water monitoring activities are derived from the US Environmental Protection Agency regulations in 40 CFR Part 192 (1991) and 60 FR 2854 (1995). Sampling procedures are guided by the UMTRA Project standard operating procedures (JEG, n.d.), the Technical Approach Document (DOE, 1989), and the most effective technical approach for the site. Additional site-specific documents relevant to the Mexican Hat site are the Mexican Hat Long-Term Surveillance Plan (currently in progress), and the Mexican Hat Site Observational Work Plan (currently in progress)

  17. PROJECT - RESOURCE MANAGEMENT OF INNOVATIONS IN EDUCATION: ANTHROPOLOGICAL PROJECTION

    Directory of Open Access Journals (Sweden)

    Galina Aleksandrovna Ignat’eva

    2015-08-01

    Full Text Available The purpose of the research was to denote a way to solve the problem of education mana-gement ΄s insufficient efficiency considered from the point of view of education opportunities to influence on the formation of mechanisms for sustainable development of society as a whole and its educational component. The concept «project-resource management of innovation in education» regarded on the basis of the anthropological project-transforming paradigm. Conceptually-categorical context presented by conceptual cluster composed of coordinated concepts «project», «resource», «educational reality», «organizational-resource potential», «project commonality». In the theoretical part of the study on the basis of analysis of the normative and exploratory approaches to educational innovations organization and management it was established the search approach ΄s leading role in the methodological substantiation of project-resource management. The study have indicated that in the presence of variable models of innovation management in education, corresponding to various predictive models of continuing education post-industrial society, project-resource management is an universal mechanism for the transition from separate innovation΄s precedents to the an authentic reality of innovative education. In the technological part of the study the main concern was to submit the project-resource management by the management goal’s system, each of which includes the specific management actions, projected results and the organizational forms. The project-resource management ΄s professional – activity context of the study showed evolution of managerial positions: an effective performer – an effective leader – strategist, implemented during the transition from directly directive management to the project management and further to the project-resource management. Based on the findings identified the key factors of initiatively-problem projects

  18. Projected change in East Asian summer monsoon by dynamic downscaling: Moisture budget analysis

    Science.gov (United States)

    Jung, Chun-Yong; Shin, Ho-Jeong; Jang, Chan Joo; Kim, Hyung-Jin

    2015-02-01

    The summer monsoon considerably affects water resource and natural hazards including flood and drought in East Asia, one of the world's most densely populated area. In this study, we investigate future changes in summer precipitation over East Asia induced by global warming through dynamical downscaling with the Weather Research and Forecast model. We have selected a global model from the Coupled Model Intercomparison Project Phase 5 based on an objective evaluation for East Asian summer monsoon and applied its climate change under Representative Concentration Pathway 4.5 scenario to a pseudo global warming method. Unlike the previous studies that focused on a qualitative description of projected precipitation changes over East Asia, this study tried to identify the physical causes of the precipitation changes by analyzing a local moisture budget. Projected changes in precipitation over the eastern foothills area of Tibetan Plateau including Sichuan Basin and Yangtze River displayed a contrasting pattern: a decrease in its northern area and an increase in its southern area. A local moisture budget analysis indicated the precipitation increase over the southern area can be mainly attributed to an increase in horizontal wind convergence and surface evaporation. On the other hand, the precipitation decrease over the northern area can be largely explained by horizontal advection of dry air from the northern continent and by divergent wind flow. Regional changes in future precipitation in East Asia are likely to be attributed to different mechanisms which can be better resolved by regional dynamical downscaling.

  19. Geospace exploration project: Arase (ERG)

    Science.gov (United States)

    Miyoshi, Y.; Kasaba, Y.; Shinohara, I.; Takashima, T.; Asamura, K.; Matsumoto, H.; Higashio, N.; Mitani, T.; Kasahara, S.; Yokota, S.; Wang, S.; Kazama, Y.; Kasahara, Y.; Yagitani, S.; Matsuoka, A.; Kojima, H.; Katoh, Y.; Shiokawa, K.; Seki, K.; Fujimoto, M.; Ono, T.; ERG project Group

    2017-06-01

    The ERG (Exploration of energization and Radiation in Geospace) is Japanese geospace exploration project. The project focuses on relativistic electron acceleration mechanism of the outer belt and dynamics of space storms in the context of the cross-energy coupling via wave-particle interactions. The project consists of the satellite observation team, the ground-based network observation team, and integrated-data analysis/simulation team. The satellite was launched on December 20 2016 and has been nicknamed, “Arase”. This paper describes overview of the project and future plan for observations.

  20. AHP-based risk analysis of energy performance contracting projects in Russia

    International Nuclear Information System (INIS)

    Garbuzova-Schlifter, Maria; Madlener, Reinhard

    2016-01-01

    Understanding and properly managing risks that could potentially affect the target- and performance-based profits of energy performance contracting (EPC) projects are essential. It is particularly important for the establishment and success of energy service companies (ESCOs) acting in the vulnerable environment of the vast but highly energy-inefficient Russian market. This study systematically explores common risk factors and causes of risk associated with EPC projects executed in three Russian sectors: (1) industrial; (2) housing and communal services; and (3) public. Several interviews with the Russian EPC experts were accomplished and a qualitative risk assessment by using an analytic hierarchy process (AHP) approach. The data were obtained from a web-based questionnaire survey conducted among Russian EPC project executors. For each focus sector, a specific preference-based ranking of the identified risk factors and causes of risk was derived. The AHP results show that causes of risk related to the financial and regulatory aspects contribute most to the riskiness of EPC projects performed in all three focus sectors in Russia, calling for the special attention of EPC policy- and business-makers. Due to sectorial particularities and different actors involved, we conclude that there is a need for elaboration of sector-specific contractual schemes for EPC projects. - Highlights: • AHP- and survey-based study of energy performance contracting (EPC) projects in Russia. • Main risk factors and causes of risk associated with EPC projects are investigated. • In practice, lack of a feasible risk management approach in EPC projects. • Regulatory and financial risks contribute most to the EPC projects’ riskiness. • Elaboration of the sector-specific EPC project contractual scheme is required.

  1. Scientific Opinion on the Pest Risk Analysis on Phytophthora ramorum prepared by the FP6 project RAPRA

    DEFF Research Database (Denmark)

    Baker, R.; Candresse, T.; Dormannsné Simon, E.

    2011-01-01

    The Panel on Plant Health was asked to deliver a scientific opinion on the Pest Risk Analysis on Phytophthora ramorum prepared by the FP6 project RAPRA, taking into account comments by Member States and additional information since RAPRA. P. ramorum is the oomycete causing sudden oak death...

  2. Identification and analysis of functional elements in 1% of the human genome by the ENCODE pilot project

    DEFF Research Database (Denmark)

    Birney, Ewan; Stamatoyannopoulos, John A; Dutta, Anindya

    2007-01-01

    We report the generation and analysis of functional data from multiple, diverse experiments performed on a targeted 1% of the human genome as part of the pilot phase of the ENCODE Project. These data have been further integrated and augmented by a number of evolutionary and computational analyses...

  3. Investigation of drug products received for analysis in the Swedish STRIDA project on new psychoactive substances.

    Science.gov (United States)

    Bäckberg, Matilda; Jönsson, Karl-Henrik; Beck, Olof; Helander, Anders

    2018-02-01

    The web-based open sale of unregulated new psychoactive substances (NPS) has shown a steady increase in recent years. Analysis of drug products sold as NPS is useful to confirm the true chemical contents, for comparison with the substances detected in corresponding body fluids, but also to study drug trends. This work describes the examination of 251 drug products that were randomly submitted for analysis in 173 cases of suspected NPS-related intoxications in the Swedish STRIDA project in 2010-2015. Of the products, 39% were powders/crystals, 32% tablets/capsules, 16% herbal materials, 8% liquids, 1% blotters, and 4% others. The analysis involved tandem mass spectrometry and nuclear magnetic resonance spectroscopy. In 88 products (35%), classic psychoactive substances, prescription pharmaceuticals, dietary supplements, or doping agents were found; however, in none of these cases had an NPS-related intoxication been indicated from product markings or patient self-reports. Another 12 products tested negative for psychoactive substances. The remaining 151 products contained 86 different NPS (30% contained ≥2 substances). In 104 drug products, a specific NPS ingredient was indicated based on labelling (69%) or patient self-report; in 92 cases this was also analytically confirmed to be correct. Overall, the NPS products submitted for analysis in the STRIDA project showed a high degree of consistency between suspected and actual content (88%). The results of related urine and/or blood analysis further demonstrated that the patients commonly (89%) tested positive for the indicated NPS, but also revealed that polysubstance intoxication was common (83%), indicating use of additional drug products. Copyright © 2017 John Wiley & Sons, Ltd.

  4. Human error analysis project (HEAP) - The fourth pilot study: verbal data for analysis of operator performance

    International Nuclear Information System (INIS)

    Braarud, Per Oeyvind; Droeyvoldsmo, Asgeir; Hollnagel, Erik

    1997-06-01

    This report is the second report from the Pilot study No. 4 within the Human Error Analyses Project (HEAP). The overall objective of HEAP is to provide a better understanding and explicit modelling of how and why ''cognitive errors'' occur. This study investigated the contribution from different verbal data sources for analysis of control room operator's performance. Operator's concurrent verbal report, retrospective verbal report, and process expert's comments were compared for their contribution to an operator performance measure. This study looked into verbal protocols for single operator and for team. The main findings of the study were that all the three verbal data sources could be used to study performance. There was a relative high overlap between the data sources, but also a unique contribution from each source. There was a common pattern in the types of operator activities the data sources gave information about. The operator's concurrent protocol overall contained slightly more information on the operator's activities than the other two verbal sources. The study also showed that concurrent verbal protocol is feasible and useful for analysis of team's activities during a scenario. (author)

  5. United Nations Environment Programme Capacity Building Pilot Project - Training on persistent organic pollutant analysis under the Stockholm Convention

    NARCIS (Netherlands)

    de Boer, J.; Leslie, H.A.; van Leeuwen, S.P.J.; Wegener, J.W.M.; van Bavel, B; Lindstrom, G.; Lahoutifard, N.; Fiedler, H.

    2008-01-01

    Within the framework of a United Nations Environment Programme (UNEP) Capacity Building Project for training of laboratory staff in developing countries on persistent organic pollutant (POP) analysis, an interlaboratory study was organised following an initial evaluation of the performance of

  6. Sampling and analysis plan for the preoperational environmental survey for the immobilized low activity waste (ILAW) project W-465

    International Nuclear Information System (INIS)

    Mitchell, R.M.

    1998-01-01

    This document provides a detailed description of the Sampling and Analysis Plan for the Preoperational Survey to be conducted at the Immobilized Low Activity Waste (ILAW) Project Site in the 200 East Area

  7. Ethical considerations of research policy for personal genome analysis: the approach of the Genome Science Project in Japan.

    Science.gov (United States)

    Minari, Jusaku; Shirai, Tetsuya; Kato, Kazuto

    2014-12-01

    As evidenced by high-throughput sequencers, genomic technologies have recently undergone radical advances. These technologies enable comprehensive sequencing of personal genomes considerably more efficiently and less expensively than heretofore. These developments present a challenge to the conventional framework of biomedical ethics; under these changing circumstances, each research project has to develop a pragmatic research policy. Based on the experience with a new large-scale project-the Genome Science Project-this article presents a novel approach to conducting a specific policy for personal genome research in the Japanese context. In creating an original informed-consent form template for the project, we present a two-tiered process: making the draft of the template following an analysis of national and international policies; refining the draft template in conjunction with genome project researchers for practical application. Through practical use of the template, we have gained valuable experience in addressing challenges in the ethical review process, such as the importance of sharing details of the latest developments in genomics with members of research ethics committees. We discuss certain limitations of the conventional concept of informed consent and its governance system and suggest the potential of an alternative process using information technology.

  8. The Development of an Instrument to Measure the Project Competences of College Students in Online Project-Based Learning

    Science.gov (United States)

    Lin, Chien-Liang

    2018-02-01

    This study sought to develop a self-report instrument to be used in the assessment of the project competences of college students engaged in online project-based learning. Three scales of the KIPSSE instrument developed for this study, namely, the knowledge integration, project skills, and self-efficacy scales, were based on related theories and the analysis results of three project advisor interviews. Those items of knowledge integration and project skill scales focused on the integration of different disciplines and technological skills separately. Two samples of data were collected from information technology-related courses taught with an online project-based learning strategy over different semesters at a college in southern Taiwan. The validity and reliability of the KIPSSE instrument were confirmed through item analysis and confirmatory factor analysis using structural equation modeling of two samples of students' online response sets separately. The Cronbach's alpha reliability coefficient for the entire instrument was 0.931; for each scale, the alpha ranged from 0.832 to 0.907. There was also a significant correlation ( r = 0.55, p < 0.01) between the KIPSSE instrument results and the students' product evaluation scores. The findings of this study confirmed the validity and reliability of the KIPSSE instrument. The confirmation process and related implications are also discussed.

  9. Building Productivity in Virtual Project Teams

    Directory of Open Access Journals (Sweden)

    Bill Hamersly

    2015-04-01

    Full Text Available The steady increase in project failure rates is leaving businesses searching for better integration techniques to virtualize their project environments. Through virtualization, organizations may have positive impacts on communities across geographical boundaries and resource constraints. The focus of this phenomenological study was to explore, via the experiences of successful project management practitioners, best practice strategies for integrating virtual project teams through data analysis. The conceptual framework included von Bertalanffy’s general systems theory, decomposition model of business process and project management frameworks, and the recomposition approach. Twenty-two senior project managers with more than 5 years of experience managing virtual project environments participated in semistructured telephone interviews. The van Kaam process employing normalization and bracketing approaches in data analysis resulted in the emergence of 34 thematic categories. The 10 most common themes culminated in the identification of strategies relevant for virtual project teams. The major themes pertained to 3 broad areas: (a structure that accommodates skills and technology for virtual team success, (b governance leading to efficient virtual project team management, and (c collaboration practices across diverse environments. This study involved the exploration of the experiences of the participants. Using the van Kaam method for normalization of the data and clustering like experiences into thematic statements, the study provided a plethora of new information concentrated on 10 themes that emerged.

  10. Kernel based subspace projection of hyperspectral images

    DEFF Research Database (Denmark)

    Larsen, Rasmus; Nielsen, Allan Aasbjerg; Arngren, Morten

    In hyperspectral image analysis an exploratory approach to analyse the image data is to conduct subspace projections. As linear projections often fail to capture the underlying structure of the data, we present kernel based subspace projections of PCA and Maximum Autocorrelation Factors (MAF...

  11. Data-driven fault detection for industrial processes canonical correlation analysis and projection based methods

    CERN Document Server

    Chen, Zhiwen

    2017-01-01

    Zhiwen Chen aims to develop advanced fault detection (FD) methods for the monitoring of industrial processes. With the ever increasing demands on reliability and safety in industrial processes, fault detection has become an important issue. Although the model-based fault detection theory has been well studied in the past decades, its applications are limited to large-scale industrial processes because it is difficult to build accurate models. Furthermore, motivated by the limitations of existing data-driven FD methods, novel canonical correlation analysis (CCA) and projection-based methods are proposed from the perspectives of process input and output data, less engineering effort and wide application scope. For performance evaluation of FD methods, a new index is also developed. Contents A New Index for Performance Evaluation of FD Methods CCA-based FD Method for the Monitoring of Stationary Processes Projection-based FD Method for the Monitoring of Dynamic Processes Benchmark Study and Real-Time Implementat...

  12. Performance Refactoring of Instrumentation, Measurement, and Analysis Technologies for Petascale Computing: the PRIMA Project

    Energy Technology Data Exchange (ETDEWEB)

    Malony, Allen D. [Department of Computer and Information Science, University of Oregon; Wolf, Felix G. [Juelich Supercomputing Centre, Forschungszentrum Juelich

    2014-01-31

    The growing number of cores provided by today’s high-end computing systems present substantial challenges to application developers in their pursuit of parallel efficiency. To find the most effective optimization strategy, application developers need insight into the runtime behavior of their code. The University of Oregon (UO) and the Juelich Supercomputing Centre of Forschungszentrum Juelich (FZJ) develop the performance analysis tools TAU and Scalasca, respectively, which allow high-performance computing (HPC) users to collect and analyze relevant performance data – even at very large scales. TAU and Scalasca are considered among the most advanced parallel performance systems available, and are used extensively across HPC centers in the U.S., Germany, and around the world. The TAU and Scalasca groups share a heritage of parallel performance tool research and partnership throughout the past fifteen years. Indeed, the close interactions of the two groups resulted in a cross-fertilization of tool ideas and technologies that pushed TAU and Scalasca to what they are today. It also produced two performance systems with an increasing degree of functional overlap. While each tool has its specific analysis focus, the tools were implementing measurement infrastructures that were substantially similar. Because each tool provides complementary performance analysis, sharing of measurement results is valuable to provide the user with more facets to understand performance behavior. However, each measurement system was producing performance data in different formats, requiring data interoperability tools to be created. A common measurement and instrumentation system was needed to more closely integrate TAU and Scalasca and to avoid the duplication of development and maintenance effort. The PRIMA (Performance Refactoring of Instrumentation, Measurement, and Analysis) project was proposed over three years ago as a joint international effort between UO and FZJ to accomplish

  13. How to Grow Project Scientists: A Systematic Approach to Developing Project Scientists

    Science.gov (United States)

    Kea, Howard

    2011-01-01

    The Project Manager is one of the key individuals that can determine the success or failure of a project. NASA is fully committed to the training and development of Project Managers across the agency to ensure that highly capable individuals are equipped with the competencies and experience to successfully lead a project. An equally critical position is that of the Project Scientist. The Project Scientist provides the scientific leadership necessary for the scientific success of a project by insuring that the mission meets or exceeds the scientific requirements. Traditionally, NASA Goddard project scientists were appointed and approved by the Center Science Director based on their knowledge, experience, and other qualifications. However the process to obtain the necessary knowledge, skills and abilities was not documented or done in a systematic way. NASA Goddard's current Science Director, Nicholas White saw the need to create a pipeline for developing new projects scientists, and appointed a team to develop a process for training potential project scientists. The team members were Dr. Harley Thronson, Chair, Dr. Howard Kea, Mr. Mark Goldman, DACUM facilitator and the late Dr. Michael VanSteenberg. The DACUM process, an occupational analysis and evaluation system, was used to produce a picture of the project scientist's duties, tasks, knowledge, and skills. The output resulted in a 3-Day introductory course detailing all the required knowledge, skills and abilities a scientist must develop over time to be qualified for selections as a Project Scientist.

  14. Landscape and participation: construction of a PhD research problem and an analysis method. Towards the comparative analysis of participatory processes of landscape management projects design on a local scale in the Walloon region (Belgium)

    OpenAIRE

    Droeven, Emilie

    2007-01-01

    A preliminary reflection to the definition of a PhD research problem on the concepts of participation, landscape and project, led the student to be interested in the participatory processes of landscape management projects design, and in the inhabitants landscapes representations. The method includes the comparative analysis of local processes of projects design, and the direct observation of two Walloon landscape management projects design (investigation conducted with stakeholders implied i...

  15. Choosing to Cofinance: Analysis of Project-Specific Alliances in the Movie Industry

    OpenAIRE

    Darius Palia; S. Abraham Ravid; Natalia Reisel

    2008-01-01

    We use a movie industry project-by-project dataset to analyze the choice of financing a project internally versus financing it through outside alliances. The results indicate that project risk is positively correlated with alliance formation. Movie studios produce a variety of films and tend to develop their safest projects internally. Our findings are consistent with internal capital market explanations. We find mixed evidence regarding resource pooling, i.e., sharing the cost of large proje...

  16. Projective mapping

    DEFF Research Database (Denmark)

    Dehlholm, Christian; Brockhoff, Per B.; Bredie, Wender Laurentius Petrus

    2012-01-01

    by the practical testing environment. As a result of the changes, a reasonable assumption would be to question the consequences caused by the variations in method procedures. Here, the aim is to highlight the proven or hypothetic consequences of variations of Projective Mapping. Presented variations will include...... instructions and influence heavily the product placements and the descriptive vocabulary (Dehlholm et.al., 2012b). The type of assessors performing the method influences results with an extra aspect in Projective Mapping compared to more analytical tests, as the given spontaneous perceptions are much dependent......Projective Mapping (Risvik et.al., 1994) and its Napping (Pagès, 2003) variations have become increasingly popular in the sensory field for rapid collection of spontaneous product perceptions. It has been applied in variations which sometimes are caused by the purpose of the analysis and sometimes...

  17. Managing a big ground-based astronomy project: the Thirty Meter Telescope (TMT) project

    Science.gov (United States)

    Sanders, Gary H.

    2008-07-01

    TMT is a big science project and its scale is greater than previous ground-based optical/infrared telescope projects. This paper will describe the ideal "linear" project and how the TMT project departs from that ideal. The paper will describe the needed adaptations to successfully manage real world complexities. The progression from science requirements to a reference design, the development of a product-oriented Work Breakdown Structure (WBS) and an organization that parallels the WBS, the implementation of system engineering, requirements definition and the progression through Conceptual Design to Preliminary Design will be summarized. The development of a detailed cost estimate structured by the WBS, and the methodology of risk analysis to estimate contingency fund requirements will be summarized. Designing the project schedule defines the construction plan and, together with the cost model, provides the basis for executing the project guided by an earned value performance measurement system.

  18. The Swedish satellite project Viking

    International Nuclear Information System (INIS)

    Hultqvist, B.

    1990-01-01

    The Swedish satellite project Viking is described and related to earlier missions. Some new operational characteristics are discussed, including the real-time data analysis campaigns that were an important part of the project. Some areas of important scientific impact of the project are also described. Viking was specially designed and equipped for investigation of plasma physical acceleration and other processes in the transition region between hot and cold plasma on auroral latitude magnetic field lines

  19. Life Cycle Energy Consumption and Greenhouse Gas Emissions Analysis of Natural Gas-Based Distributed Generation Projects in China

    Directory of Open Access Journals (Sweden)

    Hansi Liu

    2017-10-01

    Full Text Available In this paper, we used the life-cycle analysis (LCA method to evaluate the energy consumption and greenhouse gas (GHG emissions of natural gas (NG distributed generation (DG projects in China. We took the China Resources Snow Breweries (CRSB NG DG project in Sichuan province of China as a base scenario and compared its life cycle energy consumption and GHG emissions performance against five further scenarios. We found the CRSB DG project (all energy input is NG can reduce GHG emissions by 22%, but increase energy consumption by 12% relative to the scenario, using coal combined with grid electricity as an energy input. The LCA also indicated that the CRSB project can save 24% of energy and reduce GHG emissions by 48% relative to the all-coal scenario. The studied NG-based DG project presents major GHG emissions reduction advantages over the traditional centralized energy system. Moreover, this reduction of energy consumption and GHG emissions can be expanded if the extra electricity from the DG project can be supplied to the public grid. The action of combining renewable energy into the NG DG system can also strengthen the dual merit of energy conservation and GHG emissions reduction. The marginal CO2 abatement cost of the studied project is about 51 USD/ton CO2 equivalent, which is relatively low. Policymakers are recommended to support NG DG technology development and application in China and globally to boost NG utilization and control GHG emissions.

  20. Practical Insights from Initial Studies Related to Human Error Analysis Project (HEAP)

    International Nuclear Information System (INIS)

    Follesoe, Knut; Kaarstad, Magnhild; Droeivoldsmo, Asgeir; Hollnagel, Erik; Kirwan; Barry

    1996-01-01

    This report presents practical insights made from an analysis of the three initial studies in the Human Error Analysis Project (HEAP), and the first study in the US NRC Staffing Project. These practical insights relate to our understanding of diagnosis in Nuclear Power Plant (NPP) emergency scenarios and, in particular, the factors that influence whether a diagnosis will succeed or fail. The insights reported here focus on three inter-related areas: (1) the diagnostic strategies and styles that have been observed in single operator and team-based studies; (2) the qualitative aspects of the key operator support systems, namely VDU interfaces, alarms, training and procedures, that have affected the outcome of diagnosis; and (3) the overall success rates of diagnosis and the error types that have been observed in the various studies. With respect to diagnosis, certain patterns have emerged from the various studies, depending on whether operators were alone or in teams, and on their familiarity with the process. Some aspects of the interface and alarm systems were found to contribute to diagnostic failures while others supported performance and recovery. Similar results were found for training and experience. Furthermore, the availability of procedures did not preclude the need for some diagnosis. With respect to HRA and PSA, it was possible to record the failure types seen in the studies, and in some cases to give crude estimates of the failure likelihood for certain scenarios. Although these insights are interim in nature, they do show the type of information that can be derived from these studies. More importantly, they clarify aspects of our understanding of diagnosis in NPP emergencies, including implications for risk assessment, operator support systems development, and for research into diagnosis in a broader range of fields than the nuclear power industry. (author)

  1. Forecast Inaccuracies in Power Plant Projects From Project Managers' Perspectives

    Science.gov (United States)

    Sanabria, Orlando

    Guided by organizational theory, this phenomenological study explored the factors affecting forecast preparation and inaccuracies during the construction of fossil fuel-fired power plants in the United States. Forecast inaccuracies can create financial stress and uncertain profits during the project construction phase. A combination of purposeful and snowball sampling supported the selection of participants. Twenty project managers with over 15 years of experience in power generation and project experience across the United States were interviewed within a 2-month period. From the inductive codification and descriptive analysis, 5 themes emerged: (a) project monitoring, (b) cost control, (c) management review frequency, (d) factors to achieve a precise forecast, and (e) factors causing forecast inaccuracies. The findings of the study showed the factors necessary to achieve a precise forecast includes a detailed project schedule, accurate labor cost estimates, monthly project reviews and risk assessment, and proper utilization of accounting systems to monitor costs. The primary factors reported as causing forecast inaccuracies were cost overruns by subcontractors, scope gaps, labor cost and availability of labor, and equipment and material cost. Results of this study could improve planning accuracy and the effective use of resources during construction of power plants. The study results could contribute to social change by providing a framework to project managers to lessen forecast inaccuracies, and promote construction of power plants that will generate employment opportunities and economic development.

  2. An exploration of the option space in student design projects for uncertainty and sensitivity analysis with performance simulation

    NARCIS (Netherlands)

    Struck, C.; Wilde, de P.J.C.J.; Hopfe, C.J.; Hensen, J.L.M.

    2008-01-01

    This paper describes research conducted to gather empirical evidence on extent, character and content of the option space in building design projects, from the perspective of a climate engineer using building performance simulation for concept evaluation. The goal is to support uncertainty analysis

  3. An empirical analysis of the relationship between cost of control activities and project management success

    Directory of Open Access Journals (Sweden)

    Al-Tmeemy Samiaah

    2018-01-01

    Full Text Available To achieve the objectives of continuous improvement programs, construction managers must link the achievement of quality with cost. This paper aims to associate project management success (PMS with cost of control (COC activities in an empirical manner. Thus, the purpose is to determine the extent to which COC activities impact PMS. Quantitative method was adopted to collect data from Malaysian building companies using postal and email surveys. Hypothesis is tested using correlation and simple linear regression analysis. The findings of this study indicate that COC activities are positively associated with the PMS. The empirical evidences obtained from this research, provides financial justification for all quality improvement efforts. This can assist building contractors to enhance the success of project management by reducing the level of business failures due to poor quality, cost overruns, and delays.

  4. Progress with the NESC spinning cylinder project and other NESC projects

    International Nuclear Information System (INIS)

    Wintle, J.B.; Hurst, R.C.; Hemsworth, B.

    1995-01-01

    The first international project (NESC I) of the Network of Evaluating Steel Components is a spinning cylinder, pressurized thermal shock (PTS) experiment. The main objective of the project is to validate the non-destructive evaluation and structural mechanics procedures for PWR reactor pressure vessels under PTS conditions. Contributing organizations world-wide will participate in this blind trial which embraces all aspects of structural integrity assessment. This paper describes the progress of the project to date, covering cylinder manufacture and inspection, materials evaluation, structural analysis and test instrumentation. It emphasizes the importance of networking global expertise in a managed framework and of the partnership, co-operation and teamwork developed by the contributing organizations through the five Task Groups constituting the NESC I. Finally, five new initiatives for projects managed by the Network are currently under review and described in this paper

  5. HUBUNGAN KOMPETENSI PROJECT MANAGER TERHADAP KEBERHASILAN PROYEK KONSTRUKSI GEDUNG

    Directory of Open Access Journals (Sweden)

    Ida Ayu Ari Brahmantariguna

    2016-07-01

    Full Text Available Abstract :One of the factor that influences the achievement of a project success is the role of a project manager. A reliable project manager, who knows his duties as a project leader and has the necessary competency requirements is needed to achieve the success of the project. The competence of a project manager can be measured by three aspects: knowledge, skill and attitude.This research  aims to analyze the relationship between project manager competencies (that measured by three independent variables, i.e. Knowledge, skills and attitude and the success of the building construction project. Data was collected through a questionnaire survey. The sample/ respondents were the expertise in the field of building construction services those acts as a project manager. Data was analyzed  in three stages:first, factor analysis to reduce the variables into several groups of factors, that called as independent variables; second, correlation test with Pearson Correlation method to determine the correlation between independent variables  and dependent variable; lastly, perform multivariate regression analysis The results of factor analysis showed that the variables are formed into eleven groups, and the result of Pearson Correlation test showed only six groups correlated to project success, those are: Communication and Scope Management, Human Resource Management, which is part of knowledge; Leadership and Project Management, Professionalism and Issues Management as part of skill; and attitude concerning Responsibility, Vision and Priorities. The sixth group of these factors will be the independent variables in multivariate regression analysis. Based on multiple correlation test results, six independent variables simultaneously have a significant influence to the project success, proved by the result of probability value is 0,032.

  6. Quality Assurance Project Plan Development Tool

    Science.gov (United States)

    This tool contains information designed to assist in developing a Quality Assurance (QA) Project Plan that meets EPA requirements for projects that involve surface or groundwater monitoring and/or the collection and analysis of water samples.

  7. The WEST project mechanical analysis of the divertor structure according to the nuclear construction code

    Energy Technology Data Exchange (ETDEWEB)

    Larroque, S., E-mail: sebastien.larroque@cea.fr [CEA Cadarache, IRFM, F-13108 Saint-Paul-lez-Durance (France); Portafaix, C. [ITER Organization, 13108 Saint-Paul-lez-Durance (France); Saille, A.; Doceul, L.; Bucalossi, J.; Samaille, F.; Freslon, S. de [CEA Cadarache, IRFM, F-13108 Saint-Paul-lez-Durance (France)

    2014-10-15

    Highlights: • Divertor structure is mainly loaded by electromagnetical forces. • A simplified FEM analysis give the stresses in the structure. • RCCM criteria are required for the sizing. • Refined finite element models are used for local overstresses. - Abstract: The Tore Supra tokamak is being transformed in an x-point divertor fusion device in the frame of the WEST project, launched in support to the ITER tungsten divertor strategy. The installation of coils inside the vacuum vessel led to the design of a divertor supporting platform able to meet the project requirements and the associated electromagnetic loads. This paper illustrates the design, the method and the results of the thermomechanical elastic stress analyses performed in 2012. The validation of the integrity of the structure is based on the compliance with RCCMR design criteria (even though these Design and Construction rules for Mechanical Components of nuclear installations are not required for such experimental fusion device). Several 3D analyses are performed with the ANSYS code. The major one is a global analysis of half structure which determinates the stresses in the main part of the components. It gives an idea of the areas which needs local analyses. It also provides the interface loads for junction studies or simplified local model.

  8. Project Boomerang

    Science.gov (United States)

    King, Allen L.

    1975-01-01

    Describes an experimental project on boomerangs designed for an undergraduate course in classical mechanics. The students designed and made their own boomerangs, devised their own procedures, and carried out suitable measurements. Presents some of their data and a simple analysis for the two-bladed boomerang. (Author/MLH)

  9. Assessment of Transport Projects: Risk Analysis and Decision Support

    DEFF Research Database (Denmark)

    Salling, Kim Bang

    2008-01-01

    functions. New research proved that specifically two impacts stood out in transport project assessment, namely, travel time savings and construction costs. The final concern of this study has been the fitting of distributions, e.g. by the use of data from major databases developed in which Optimism Bias...... choosing probability distributions and performing real term data fits. The perspective of this Ph.D. study presents newer and better understanding of assigning risks within assessment of transport projects....

  10. Chapter 3: Design of the Saber-Tooth Project.

    Science.gov (United States)

    Ward, Phillip

    1999-01-01

    Used data from interviews, surveys, and document analysis to describe the methods and reform processes of the Saber Tooth Project, examining selection of sites; demographics (school sites, teachers, data sources, and project assumptions); and project phases (development, planning, implementation, and support). The project's method of reform was…

  11. Prioritising transport infrastructure projects: towards a multi-criterion ...

    African Journals Online (AJOL)

    Kirstam

    multi-criterion analysis (MCA), partial equilibrium analysis, project appraisal ... In the case of transport infrastructure projects, though, this is no mean ... vehicle ownership and mileage-based depreciation (an improved road network and/ .... urban, rural or regional development initiatives – they typically include one or more.

  12. Global Analysis of Climate Change Projection Effects on Atmospheric Rivers

    Science.gov (United States)

    Espinoza, Vicky; Waliser, Duane E.; Guan, Bin; Lavers, David A.; Ralph, F. Martin

    2018-05-01

    A uniform, global approach is used to quantify how atmospheric rivers (ARs) change between Coupled Model Intercomparison Project Phase 5 historical simulations and future projections under the Representative Concentration Pathway (RCP) 4.5 and RCP8.5 warming scenarios. The projections indicate that while there will be 10% fewer ARs in the future, the ARs will be 25% longer, 25% wider, and exhibit stronger integrated water vapor transports (IVTs) under RCP8.5. These changes result in pronounced increases in the frequency (IVT strength) of AR conditions under RCP8.5: 50% (25%) globally, 50% (20%) in the northern midlatitudes, and 60% (20%) in the southern midlatitudes. The models exhibit systematic low biases across the midlatitudes in replicating historical AR frequency ( 10%), zonal IVT ( 15%), and meridional IVT ( 25%), with sizable intermodel differences. A more detailed examination of six regions strongly impacted by ARs suggests that the western United States, northwestern Europe, and southwestern South America exhibit considerable intermodel differences in projected changes in ARs.

  13. Hawaii Energy Strategy Project 2: Fossil Energy Review. Task IV. Scenario development and analysis

    Energy Technology Data Exchange (ETDEWEB)

    Yamaguchi, N.D.; Breazeale, K. [ed.

    1993-12-01

    The Hawaii Energy Strategy (HES) Program is a seven-project effort led by the State of Hawaii Department of Business, Economic Development & Tourism (DBEDT) to investigate a wide spectrum of Hawaii energy issues. The East-West Center`s Program on Resources: Energy and Minerals, has been assigned HES Project 2, Fossil Energy Review, which focuses on fossil energy use in Hawaii and the greater regional and global markets. HES Project 2 has four parts: Task I (World and Regional Fossil Energy Dynamics) covers petroleum, natural gas, and coal in global and regional contexts, along with a discussion of energy and the environment. Task II (Fossil Energy in Hawaii) focuses more closely on fossil energy use in Hawaii: current utilization and trends, the structure of imports, possible future sources of supply, fuel substitutability, and energy security. Task III`s emphasis is Greenfield Options; that is, fossil energy sources not yet used in Hawaii. This task is divided into two sections: first, an in-depth {open_quotes}Assessment of Coal Technology Options and Implications for the State of Hawaii,{close_quotes} along with a spreadsheet analysis model, which was subcontracted to the Environmental Assessment and Information Sciences Division of Argonne National Laboratory; and second, a chapter on liquefied natural gas (LNG) in the Asia-Pacific market and the issues surrounding possible introduction of LNG into the Hawaii market.

  14. Project summary, 116-B-6-1 crib ISV [in situ vitrification] demonstration project

    International Nuclear Information System (INIS)

    Koegler, S.S.

    1989-01-01

    The 116-B Crib Demonstration Project is intended to demonstrate the emerging in situ vitrification (ISV) technology to immobilize or destroy hazardous and radioactive chemicals at an actual site. In situ vitrification is the conversion of contaminated soil into a durable glass and crystalline product through joule heating. The 116-B crib site was chosen for the demonstration because it contains both radioactive and hazardous chemicals (e.g., chromium) and presents a potential threat to environment. The project will involve sampling and analysis of the soil beneath the crib, a small-scale ISV test to verify operating parameters, vitrification of the crib, and analysis of the vitrified soil. 5 figs

  15. Marine radioecology. Annual report 1996. Project plan 1997

    International Nuclear Information System (INIS)

    1997-06-01

    The project plan for the EKO-1 project states that 'the main aim of the EKO-1 project is to enable faster and better assessments to be made of the effects of releases of radionuclides into the marine environment'. To meet this goal the main parts of the project were defined as follows: Model work - Identifying parameters of main interest including estimating and validating the values of these parameters; Research - Field studies, environments typical for various Nordic regions, environments with special physical or chemical characteristics. Laboratory studies; Dissemination of information - Seminars, reports, articles. During the project period emphasis has also been put on quality issues concerning sampling and analysis. The project work has progressed in accordance with project plans in 1996 and within the set budget. In modelling a parameter sensitivity analysis was carried out for a radiological assessment model used for the prediction of doses to man from dumping of radioactive waste in the Kara Sea. Doses to man were found to be generally dominated by contributions from long-lived transuranic radionuclides (plutonium and americium) which associate readily with sediments. Sediment related processes and parameters show therefore high sensitivities, especially at long distances (e.g. Barents Sea). Within the EKO-1 project there has been emphasis on encouraging the Nordic aspect of sediment research in spite of the limitations set by nationally run sampling projects. The EKO-1 project has managed this by e.g.: Organizing exchange of samples for analysis links with the EKO-2.3 project ('Limnic systems'). (EG) 52 refs

  16. Project finance for alternative energy

    International Nuclear Information System (INIS)

    Mills, S.J.

    1993-01-01

    This paper is intended to provide general advice to sponsors of renewable energy projects who expect to raise project-based financing from commercial banks to fund the development of their projects. It will set out, for the benefit of such sponsors, how bankers typically approach the analysis of these undertakings and in particular the risk areas on which they concentrate. By doing so it should assist sponsors to maximise their prospects of raising bank finance. (author)

  17. INFORMATION TECHNOLOGY IN INVESTMENT PROJECT MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Vjacheslav A. Kozlov

    2014-01-01

    Full Text Available In the article it is proved that use of information technology today is not only something innovative distinctive feature and competitive advantage for organizations, but it is a necessary condition for effective business. The article discusses the main functionality of financial-analytical system Project Expert as an effective tool of investment project management and instrument of business planning. The main advantages which organizations get from Project Expert program use are in detail considered. Thus in the article Project Expert is considered as the effective tool of investment project management which allows to receive a number of advantages and to carry out the qualitative analysis of projects.

  18. Numerical Analysis of Consolidation Settlement and Creep Deformation of Artificial Island Revetment Structure in a Large-Scale Marine Reclamation Land Project

    Directory of Open Access Journals (Sweden)

    Jie Zhao

    2015-09-01

    Full Text Available In order to analyze the influential factors of soft foundation settlement in a marine reclamation land project, the consolidation settlement and pore pressure dissipation of the entire area are numerically simulated using Soft-Soil- Creep Model, in which the PLAXIS finite element software for professional geotechnical engineering is applied and empirical data of Japanese Kansai’s airport project are used. Moreover, the figures of settlement and pore pressure results in the different basic period are drawn, and the corresponding analysis conclusions are ob-tained based on the comparison among the results from the computational parameters of depth. In addition,, the influence rules of various parameters on settlement results is concluded through running the parameter sensitivity analysis in Soft-Soil-Creep Model, and the experience and conclusions can be for reference in the design and con-struction of similar large-scale marine reclamation land project. Also the empirical value method of the creep index has not been applied widely. Further research needs to be done.

  19. Project management practice and its effects on project success in Malaysian construction industry

    Science.gov (United States)

    Haron, N. A.; Devi, P.; Hassim, S.; Alias, A. H.; Tahir, M. M.; Harun, A. N.

    2017-12-01

    The rapid economic development has increased the demand for construction of infrastructure and facilities globally. Sustainable development and globalization are the new ‘Zeitgeist’ of the 21st century. In order to implement these projects successfully and to meet the functional aim of the projects within their lifetime, an efficient project management practice is needed. The aim of this study is to identify the critical success factors (CSFs) and the extent of use of project management practice which affects project success, especially during the implementation stage. Data were obtained from self-administered questionnaires with 232 respondents. A mixed method of data collection was adopted using semi-structured interview and questionnaire approach. The result of the analysis of data obtained showed that new and emerging criteria such as customer satisfaction, competency of the project team, and performance of subcontractors/suppliers are becoming measures of success in addition to the classic iron triangle’s view of time, cost and quality. An insight on the extent of use of different project management practice in the industry was also achieved from the study.

  20. Supplement analysis for the proposed upgrades to the tank farm ventilation, instrumentation, and electrical systems under Project W-314 in support of tank farm restoration and safe operations

    International Nuclear Information System (INIS)

    1997-05-01

    The mission of the TWRS program is to store, treat, and immobilize highly radioactive tank waste in an environmentally sound, safe, and cost-effective manner. Within this program, Project W-314, Tank Farm Restoration and Safe Operations, has been established to provide upgrades in the areas of instrumentation and control, tank ventilation, waste transfer, and electrical distribution for existing tank farm facilities. Requirements for tank farm infrastructure upgrades to support safe storage were being developed under Project W-314 at the same time that the TWRS EIS alternative analysis was being performed. Project W-314 provides essential tank farm infrastructure upgrades to support continued safe storage of existing tank wastes until the wastes can be retrieved and disposed of through follow-on TWRS program efforts. Section4.0 provides a description of actions associated with Project W-314. The TWRS EIS analyzes the environmental consequences form the entire TWRS program, including actions similar to those described for Project W-314 as a part of continued tank farm operations. The TWRS EIS preferred alternative was developed to a conceptual level of detail to assess bounding impact areas. For this Supplement Analysis, in each of the potential impact areas for Project W-314, the proposed action was evaluated and compared to the TWRS EIS evaluation of the preferred alternative (Section 5.0). Qualitative and/or quantitative comparisons are then provided in this Supplement Analysis to support a determination on the need for additional National Environmental Policy Act (NEPA) analysis. Based on this Supplement Analysis, the potential impacts for Project W-314 would be small in comparison to and are bounded by the impacts assessed for the TWRS EIS preferred alternative, and therefore no additional NEPA analysis is required (Section 7.0)

  1. Independent Peer Review of Communications, Navigation, and Networking re-Configurable Testbed (CoNNeCT) Project Antenna Pointing Subsystem (APS) Integrated Gimbal Assembly (IGA) Structural Analysis

    Science.gov (United States)

    Raju, Ivatury S.; Larsen, Curtis E.; Pellicciotti, Joseph W.

    2010-01-01

    Glenn Research Center Chief Engineer's Office requested an independent review of the structural analysis and modeling of the Communications, Navigation, and Networking re-Configurable Testbed (CoNNeCT) Project Antenna Pointing Subsystem (APS) Integrated Gimbal Assembly (IGA) to be conducted by the NASA Engineering and Safety Center (NESC). At this time, the IGA had completed its critical design review (CDR). The assessment was to be a peer review of the NEi-NASTRAN1 model of the APS Antenna, and not a peer review of the design and the analysis that had been completed by the GRC team for CDR. Thus, only a limited amount of information was provided on the structural analysis. However, the NESC team had difficulty separating analysis concerns from modeling issues. The team studied the NASTRAN model, but did not fully investigate how the model was used by the CoNNeCT Project and how the Project was interpreting the results. The team's findings, observations, and NESC recommendations are contained in this report.

  2. Decision-making process in investment projects

    OpenAIRE

    Moutinho, Nuno

    2011-01-01

    We present projects evaluation approaches in what decision should be based. We try to understand what we have to take into account in a project analysis, knowing that we have to consider much unmeasured aspects, like non non-financial areas. We verify how all aspects are used and analysed in the project appraisal. We also desire to understand if companies have adequate tools and methods to correctly analyse and to take decisions in a project evaluation. In this study we identify several as...

  3. Progress with the NESC spinning cylinder project and other NESC projects

    International Nuclear Information System (INIS)

    Wintle, J.B.; Hurst, R.C.; Hemsworth, B.

    1995-01-01

    The first international project (NESC I) of the Network for Evaluating Steel Components is a spinning cylinder, pressurized thermal shock (PTS) experiment. The main objective of the project is to validate the non-destructive evaluation and structural mechanics procedures for PWR reactor pressure vessels under PTS conditions. Contributing organizations world-wide will participate in this blind trial which embraces all aspects of structural integrity assessment. This paper describes the progress of the project to date, covering cylinder manufacture and inspection, materials evaluation, structural analysis and test instrumentation. It emphasises the importance of networking global expertise in a managed framework and of the partnership, co-operation and teamwork developed by the contributing organizations through the five Task Groups constituting NESC I. Finally, five new initiatives for projects managed by the Network are currently under review and described in this paper. (author). 2 refs, 6 figs

  4. Benefit Analysis of SPC Panel SP-2 Projects

    National Research Council Canada - National Science Library

    Robinson, Rodney A

    1993-01-01

    This Task has investigated the benefits derived from the projects sponsored by SNAME Ship Production Committee Panel SP-2 on Outfitting and Production Aids during the 15 year period when this Panel...

  5. Using R-Project for Free Statistical Analysis in Extension Research

    Science.gov (United States)

    Mangiafico, Salvatore S.

    2013-01-01

    One option for Extension professionals wishing to use free statistical software is to use online calculators, which are useful for common, simple analyses. A second option is to use a free computing environment capable of performing statistical analyses, like R-project. R-project is free, cross-platform, powerful, and respected, but may be…

  6. A projection-based model reduction strategy for the wave and vibration analysis of rotating periodic structures

    Science.gov (United States)

    Beli, D.; Mencik, J.-M.; Silva, P. B.; Arruda, J. R. F.

    2018-05-01

    The wave finite element method has proved to be an efficient and accurate numerical tool to perform the free and forced vibration analysis of linear reciprocal periodic structures, i.e. those conforming to symmetrical wave fields. In this paper, its use is extended to the analysis of rotating periodic structures, which, due to the gyroscopic effect, exhibit asymmetric wave propagation. A projection-based strategy which uses reduced symplectic wave basis is employed, which provides a well-conditioned eigenproblem for computing waves in rotating periodic structures. The proposed formulation is applied to the free and forced response analysis of homogeneous, multi-layered and phononic ring structures. In all test cases, the following features are highlighted: well-conditioned dispersion diagrams, good accuracy, and low computational time. The proposed strategy is particularly convenient in the simulation of rotating structures when parametric analysis for several rotational speeds is usually required, e.g. for calculating Campbell diagrams. This provides an efficient and flexible framework for the analysis of rotordynamic problems.

  7. Multifamily Retrofit Project Manager Job/Task Analysis and Report: September 2013

    Energy Technology Data Exchange (ETDEWEB)

    Owens, C. M.

    2013-09-01

    The development of job/task analyses (JTAs) is one of three components of the Guidelines for Home Energy Professionals project and will allow industry to develop training resources, quality assurance protocols, accredited training programs, and professional certifications. The Multifamily Retrofit Project Manager JTA identifies and catalogs all of the tasks performed by multifamily retrofit project managers, as well as the knowledge, skills, and abilities (KSAs) needed to perform the identified tasks.

  8. Qualitative and quantitative analysis of reconstructed images using projections with noises

    International Nuclear Information System (INIS)

    Lopes, R.T.; Assis, J.T. de

    1988-01-01

    The reconstruction of a two-dimencional image from one-dimensional projections in an analytic algorithm ''convolution method'' is simulated on a microcomputer. In this work it was analysed the effects caused in the reconstructed image in function of the number of projections and noise level added to the projection data. Qualitative and quantitative (distortion and image noise) comparison were done with the original image and the reconstructed images. (author) [pt

  9. AEP Ohio gridSMART Demonstration Project Real-Time Pricing Demonstration Analysis

    Energy Technology Data Exchange (ETDEWEB)

    Widergren, Steven E.; Subbarao, Krishnappa; Fuller, Jason C.; Chassin, David P.; Somani, Abhishek; Marinovici, Maria C.; Hammerstrom, Janelle L.

    2014-02-01

    This report contributes initial findings from an analysis of significant aspects of the gridSMART® Real-Time Pricing (RTP) – Double Auction demonstration project. Over the course of four years, Pacific Northwest National Laboratory (PNNL) worked with American Electric Power (AEP), Ohio and Battelle Memorial Institute to design, build, and operate an innovative system to engage residential consumers and their end-use resources in a participatory approach to electric system operations, an incentive-based approach that has the promise of providing greater efficiency under normal operating conditions and greater flexibility to react under situations of system stress. The material contained in this report supplements the findings documented by AEP Ohio in the main body of the gridSMART report. It delves into three main areas: impacts on system operations, impacts on households, and observations about the sensitivity of load to price changes.

  10. Projecting Timber Inventory at the Product Level

    Science.gov (United States)

    Lawrence Teeter; Xiaoping Zhou

    1999-01-01

    Current timber inventory projections generally lack information on inventory by product classes. Most models available for inventory projection and linked to supply analyses are limited to projecting aggregate softwood and hardwood. The research presented describes a methodology for distributing the volume on each FIA (USDA Forest Service Forest Inventory and Analysis...

  11. Supply Chain Management in Flyover Projects in India

    Directory of Open Access Journals (Sweden)

    Sudhir Yadav

    2015-01-01

    Full Text Available This paper explores the application of supply chain management (SCM in the Indian construction industry. The authors studied the SCM practices followed in flyover projects and compared them with the seamless SCM model for construction proposed by a previous study. A case study approach was followed for the research work. Structured interviews were conducted to understand the SCM practices in flyover projects in India. The developed model advocates leading roles for client and strategic needs analysis and value management study that are missing in the studied projects. All of the projects studied faced cost and time overruns. The seamless SCM model may be extended to developing countries by incorporating requirements related to the long-term relationship between project agents and, if possible, by suggesting that clients should not select agents using only the minimal cost criteria. The extended model also proposes SCM training for all project agents before the start of the project. Strategic needs analysis and value management study should be an integral part of the construction project to improve project efficiency. Implementing the seamless SCM model calls for the early involvement (i.e., at the project design stage of all project agents. Project sponsors can apply the findings of this study to manage time and cost overruns.

  12. Analisis Kecelakaan Kerja Pada Proyek Bangunan Gedung (Analysis of Work Accident on Building Construction Projects)

    OpenAIRE

    Ferdiansyah, Deni; Winarno, Setya; M, Faisol A

    2009-01-01

    Work accidents and fatalities often happen in construction industry, thus a study on this matter to promote safety management needs a thorough analysis of their elements. The purpose of this paper is to identify various types of accidents, cost of accident and insurance premium, and also the correlation between the types of accidents and their costs. The data was collected from thirty construction projects around Daerah Istimewa Yogyakarta province and surrounding areas. These data included t...

  13. Risk Factors in ERP Implementation Projects for Process Oriented

    Directory of Open Access Journals (Sweden)

    Andrzej Partyka

    2009-09-01

    Full Text Available This paper present review and analysis of risk factors, which could affect successful implementation of ERP system, for project performed in project oriented organizations. Presented risk breakdown structure and the list of common risk factors, are well-suited for ERP implementation projects. Considered risk categories allow for complex risk analysis. Additionally, mapping of risk importance for particular implementation phases is presented. Making presented model an important input for project risk management process, especially for the beginning phases which require identification of risk factors.

  14. Final Report, Nuclear Energy Research Initiative (NERI) Project: An Innovative Reactor Analysis Methodology Based on a Quasidiffusion Nodal Core Model

    International Nuclear Information System (INIS)

    Anistratov, Dmitriy Y.; Adams, Marvin L.; Palmer, Todd S.; Smith, Kord S.; Clarno, Kevin; Hikaru Hiruta; Razvan Nes

    2003-01-01

    OAK (B204) Final Report, NERI Project: ''An Innovative Reactor Analysis Methodology Based on a Quasidiffusion Nodal Core Model'' The present generation of reactor analysis methods uses few-group nodal diffusion approximations to calculate full-core eigenvalues and power distributions. The cross sections, diffusion coefficients, and discontinuity factors (collectively called ''group constants'') in the nodal diffusion equations are parameterized as functions of many variables, ranging from the obvious (temperature, boron concentration, etc.) to the more obscure (spectral index, moderator temperature history, etc.). These group constants, and their variations as functions of the many variables, are calculated by assembly-level transport codes. The current methodology has two main weaknesses that this project addressed. The first weakness is the diffusion approximation in the full-core calculation; this can be significantly inaccurate at interfaces between different assemblies. This project used the nodal diffusion framework to implement nodal quasidiffusion equations, which can capture transport effects to an arbitrary degree of accuracy. The second weakness is in the parameterization of the group constants; current models do not always perform well, especially at interfaces between unlike assemblies. The project developed a theoretical foundation for parameterization and homogenization models and used that theory to devise improved models. The new models were extended to tabulate information that the nodal quasidiffusion equations can use to capture transport effects in full-core calculations

  15. World Energy Projection System model documentation

    International Nuclear Information System (INIS)

    Hutzler, M.J.; Anderson, A.T.

    1997-09-01

    The World Energy Projection System (WEPS) was developed by the Office of Integrated Analysis and Forecasting within the Energy Information Administration (EIA), the independent statistical and analytical agency of the US Department of Energy. WEPS is an integrated set of personal computer based spreadsheets containing data compilations, assumption specifications, descriptive analysis procedures, and projection models. The WEPS accounting framework incorporates projections from independently documented models and assumptions about the future energy intensity of economic activity (ratios of total energy consumption divided by gross domestic product GDP), and about the rate of incremental energy requirements met by natural gas, coal, and renewable energy sources (hydroelectricity, geothermal, solar, wind, biomass, and other renewable resources). Projections produced by WEPS are published in the annual report, International Energy Outlook. This report documents the structure and procedures incorporated in the 1998 version of the WEPS model. It has been written to provide an overview of the structure of the system and technical details about the operation of each component of the model for persons who wish to know how WEPS projections are produced by EIA

  16. World Energy Projection System model documentation

    Energy Technology Data Exchange (ETDEWEB)

    Hutzler, M.J.; Anderson, A.T.

    1997-09-01

    The World Energy Projection System (WEPS) was developed by the Office of Integrated Analysis and Forecasting within the Energy Information Administration (EIA), the independent statistical and analytical agency of the US Department of Energy. WEPS is an integrated set of personal computer based spreadsheets containing data compilations, assumption specifications, descriptive analysis procedures, and projection models. The WEPS accounting framework incorporates projections from independently documented models and assumptions about the future energy intensity of economic activity (ratios of total energy consumption divided by gross domestic product GDP), and about the rate of incremental energy requirements met by natural gas, coal, and renewable energy sources (hydroelectricity, geothermal, solar, wind, biomass, and other renewable resources). Projections produced by WEPS are published in the annual report, International Energy Outlook. This report documents the structure and procedures incorporated in the 1998 version of the WEPS model. It has been written to provide an overview of the structure of the system and technical details about the operation of each component of the model for persons who wish to know how WEPS projections are produced by EIA.

  17. Projects management in organization on the selected example

    OpenAIRE

    A. Kania; M. Spilka; S. Griner

    2013-01-01

    Purpose: In this paper stages of project management taking into consideration many useful tools and methods were presented. The quality management in the project, the risk estimation, costs of the project realization and many others were discussed. The analysis of project management of an element using in an automotive industry was carried out.Design/methodology/approach: In this article classification of the projects was presented. The stages of project management and relations among them we...

  18. Impact analysis of government investment on water projects in the arid Gansu Province of China

    Science.gov (United States)

    Wang, Zhan; Deng, Xiangzheng; Li, Xiubin; Zhou, Qing; Yan, Haiming

    In this paper, we introduced three-nested Constant Elasticity of Substitution (CES) production function into a static Computable General Equilibrium (CGE) Model. Through four levels of factor productivity, we constructed three nested production function of land use productivity in the conceptual modeling frameworks. The first level of factor productivity is generated by the basic value-added land. On the second level, factor productivity in each sector is generated by human activities that presents human intervention to the first level of factor productivity. On the third level of factor productivity, water allocation reshapes the non-linear structure of transaction among first and second levels. From the perspective of resource utilization, we examined the economic efficiency of water allocation. The scenario-based empirical analysis results show that the three-nested CES production function within CGE model is well-behaved to present the economy system of the case study area. Firstly, water scarcity harmed economic production. Government investment on water projects in Gansu thereby had impacts on economic outcomes. Secondly, huge governmental financing on water projects bring depreciation of present value of social welfare. Moreover, water use for environment adaptation pressures on water supply. The theoretical water price can be sharply increased due to the increasing costs of factor inputs. Thirdly, water use efficiency can be improved by water projects, typically can be benefited from the expansion of water-saving irrigation areas even in those expanding dry area in Gansu. Therefore, increasing governmental financing on water projects can depreciate present value of social welfare but benefit economic efficiency for future generation.

  19. Kinematical Comparison Analysis on the Discus Athletes Throwing Techniques Based on Data Project

    Science.gov (United States)

    Junming, Li; Jihe, Zhou; Ting, Long

    2017-09-01

    In the discus final site of throwing event series game of China’s track and field sport in April, 2015, three dimensional camera analytical method which is an application of kinematical data project was used on female discus athletes’ discus throwing technology. And analysis was made for the top four discus throwers’ last exertion action, related kinematics parameter was thus obtained. Analysis results show that: first, Lu Xiaoxin behaves better in body twist tight effect when it is left foot on the ground and in capacity of beyond devices, followed by Su Xinyue and Tan Jian, with Feng Bin relatively weaker; second, our athletes’ discus shots speed is to be upgraded compared with world excellent female discus athletes; third, discus is left slightly earlier, with Tan Jian throwing in a reasonable angle, Feng Bin, Lu Xiaoxin in a larger angle, and Sue Xinyue in a smaller angle. Feng bin has a higher height of release, followed by Lu Xiaoxin and Tan jian.

  20. Assessing the influence of Environmental Impact Assessments on science and policy: an analysis of the Three Gorges Project.

    Science.gov (United States)

    Tullos, Desiree

    2009-07-01

    The need to understand and minimize negative environmental outcomes associated with large dams has both contributed to and benefited from the introduction and subsequent improvements in the Environmental Impact Assessment (EIA) process. However, several limitations in the EIA process remain, including those associated with the uncertainty and significance of impact projections. These limitations are directly related to the feedback between science and policy, with information gaps in scientific understanding discovered through the EIA process contributing valuable recommendations on critical focus areas for prioritizing and funding research within the fields of ecological conservation and river engineering. This paper presents an analysis of the EIA process for the Three Gorges Project (TGP) in China as a case study for evaluating this feedback between the EIA and science and policy. For one of the best-studied public development projects in the world, this paper presents an investigation into whether patterns exist between the scientific interest (via number of publications) in environmental impacts and (a) the identification of impacts as uncertain or priority by the EIA, (b) decisions or political events associated with the dam, and (c) impact type. This analysis includes the compilation of literature on TGP, characterization of ecosystem interactions and responses to TGP through a hierarchy of impacts, coding of EIA impacts as "uncertain" impacts that require additional study and "priority" impacts that have particularly high significance, mapping of an event chronology to relate policies, institutional changes, and decisions about TGP as "events" that could influence the focus and intensity of scientific investigation, and analysis of the number of publications by impact type and order within the impact hierarchy. From these analyses, it appears that the availability and consistency of scientific information limit the accuracy of environmental impact

  1. Challenges in Mentoring Software Development Projects in the High School: Analysis According to Shulman's Teacher Knowledge Base Model

    Science.gov (United States)

    Meerbaum-Salant, Orni; Hazzan, Orit

    2009-01-01

    This paper focuses on challenges in mentoring software development projects in the high school and analyzes difficulties encountered by Computer Science teachers in the mentoring process according to Shulman's Teacher Knowledge Base Model. The main difficulties that emerged from the data analysis belong to the following knowledge sources of…

  2. Analysis of an Interactive Technology Supported Problem-Based Learning STEM Project Using Selected Learning Sciences Interest Areas (SLSIA)

    Science.gov (United States)

    Kumar, David Devraj

    2017-01-01

    This paper reports an analysis of an interactive technology-supported, problem-based learning (PBL) project in science, technology, engineering and mathematics (STEM) from a Learning Sciences perspective using the Selected Learning Sciences Interest Areas (SLSIA). The SLSIA was adapted from the "What kinds of topics do ISLS [International…

  3. RISMC Advanced Safety Analysis Project Plan – FY 2015 - FY 2019

    Energy Technology Data Exchange (ETDEWEB)

    Szilard, Ronaldo H. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Smith, Curtis L. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Youngblood, Robert [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2014-09-01

    In this report, a project plan is developed, focused on industry applications, using Risk-Informed Safety Margin Characterization (RISMC) tools and methods applied to realistic, relevant, and current interest issues to the operating nuclear fleet. RISMC focuses on modernization of nuclear power safety analysis (tools, methods and data); implementing state-of-the-art modeling techniques (which include, for example, enabling incorporation of more detailed physics as they become available); taking advantage of modern computing hardware; and combining probabilistic and mechanistic analyses to enable a risk informed safety analysis process. The modernized tools will maintain the current high level of safety in our nuclear power plant fleet, while providing an improved understanding of safety margins and the critical parameters that affect them. Thus, the set of tools will provide information to inform decisions on plant modifications, refurbishments, and surveillance programs, while improving economics. This set of tools will also benefit the design of new reactors, enhancing safety per unit cost of a nuclear plant. The proposed plan will focus on application of the RISMC toolkit, in particular, solving realistic problems of important current issues to the nuclear industry, in collaboration with plant owners and operators to demonstrate the usefulness of these tools in decision making.

  4. Performance Refactoring of Instrumentation, Measurement, and Analysis Technologies for Petascale Computing. The PRIMA Project

    Energy Technology Data Exchange (ETDEWEB)

    Malony, Allen D. [Univ. of Oregon, Eugene, OR (United States). Dept. of Computer and Information Science; Wolf, Felix G. [Wilhelm-Johnen-Strasse, Julich (Germany). Forschungszentrum Julich GmbH

    2014-01-31

    The growing number of cores provided by today’s high-­end computing systems present substantial challenges to application developers in their pursuit of parallel efficiency. To find the most effective optimization strategy, application developers need insight into the runtime behavior of their code. The University of Oregon (UO) and the Juelich Supercomputing Centre of Forschungszentrum Juelich (FZJ) develop the performance analysis tools TAU and Scalasca, respectively, which allow high-­performance computing (HPC) users to collect and analyze relevant performance data – even at very large scales. TAU and Scalasca are considered among the most advanced parallel performance systems available, and are used extensively across HPC centers in the U.S., Germany, and around the world. The TAU and Scalasca groups share a heritage of parallel performance tool research and partnership throughout the past fifteen years. Indeed, the close interactions of the two groups resulted in a cross-­fertilization of tool ideas and technologies that pushed TAU and Scalasca to what they are today. It also produced two performance systems with an increasing degree of functional overlap. While each tool has its specific analysis focus, the tools were implementing measurement infrastructures that were substantially similar. Because each tool provides complementary performance analysis, sharing of measurement results is valuable to provide the user with more facets to understand performance behavior. However, each measurement system was producing performance data in different formats, requiring data interoperability tools to be created. A common measurement and instrumentation system was needed to more closely integrate TAU and Scalasca and to avoid the duplication of development and maintenance effort. The PRIMA (Performance Refactoring of Instrumentation, Measurement, and Analysis) project was proposed over three years ago as a joint international effort between UO and FZJ to

  5. Analysis of critical paths for schedule control of nuclear power projects

    International Nuclear Information System (INIS)

    Shi Liangmin; Ma Limin; Fan Kai

    2005-01-01

    Study on the critical paths for the schedule control of nuclear power projects has been performed for reactor M310, based on the experiences from Daya Bay project and Ling Ao project. The study shows that the critical paths for the nuclear power project are from NI civil work, NI erection, commissioning of single systems directly serving the CFT to the joint-test. For NI civil work, the critical path is the main civil work of the reactor building, pre-stressing, handover of rooms for important areas, and key CW-erection interfaces; there are four critical paths for NI erection; For startup, two stages can be identified: commissioning of 16 single systems directly serving the CFT and joint-test. (authors)

  6. The international hydrocoin project

    International Nuclear Information System (INIS)

    1987-01-01

    The International HYDROCOIN (Hydrologic Code Intercomparison) Project was started in May 1984. Fourteen organizations participate in the Project, with the Swedish Nuclear Power Inspectorate (SKI) as managing participant and the OECD Nuclear Energy Agency (NEA) taking part as a member of the Project secretariat. HYDROCOIN is concerned with the assessment of groundwater movements at potential nuclear waste disposal sites with the help of mathematical models and computer codes. The Project is divided into three levels. The objective of HYDROCOIN Level 1 is to verify the accuracy of groundwater flow codes. HYDROCOIN Level 2 and Level 3 are concerned with validation of hydrological models and uncertainty/sensitivity analysis, respectively. This report, which has been prepared by the NEA Secretariat and SKI in consultation with the co-ordinating group of the HYDROCOIN Project summarizes the background and objectives of the Project and presents the results of the work performed up to the middle of 1987. It is intended to provide general information on HYDROCOIN to interested parties beyond the group of directly involved specialists

  7. Project finance for renewable energy

    International Nuclear Information System (INIS)

    Mills, S.J.; Taylor, M.

    1994-01-01

    This paper is intended to provide general advice to sponsors of renewable energy projects who expect to raise project-based financing from commercial banks to fund the development of their projects. It sets out, for the benefit of such sponsors, how bankers typically approach the analysis of these undertakings and in particular the risk areas on which they concentrate. By doing so it should assist sponsors to maximize their prospects of raising bank finance. The watchword for sponsors approaching banks must be ''Be Prepared'' . (author)

  8. Evaluation of Building Projects Using Earned Value Technique ...

    African Journals Online (AJOL)

    This study evaluates building construction projects using the Earned Value Analysis technique, the Experimental Approach, and Value Concept Analysis. The aim was to compare the cost incurred for an identified amount of work done on a project with the cost budgeted for the same work. The results were used to calculate ...

  9. LNG project - contractual aspects

    Energy Technology Data Exchange (ETDEWEB)

    Goncalves, Bruno Almeida

    2008-07-01

    This paper intends to provide from the legal point of view an outline of the main challenges of a LNG project in the upstream, regulatory aspects, liquefaction, financing and midstream through a basic checklist; an overview of the contractual complexity of a LNG project; some basic discussion of particular LNG contract clauses; and a comparative analysis between the classic clauses of a Gas Transportation Agreement (GTA) through a gas pipeline and LNG logistic. (author)

  10. Analysis of debt leveraging in private power projects

    International Nuclear Information System (INIS)

    Kahn, E.P.; Meal, M.; Doerrer, S.; Morse, S.

    1992-08-01

    As private power (non-utility generation) has grown to become a significant part of the electricity system, increasing concern about its financial implications has arisen. In many cases, the source of this concern has been the substantial reliance of these projects on debt financing. This study examines debt leveraging in private power projects. The policy debate on these issues has typically been conducted at a high level of generality. Critics of the private power industry assert that high debt leveraging confers an unfair competitive advantage by lowering the cost of capital, and that this leveraging is only possible because risks are shifted to the utility. Further, debt leveraging is claimed to be a threat to reliability. On the opposite side, it is argued that debt leveraging imposes costs and obligations not home by utilities, and so there is no financial advantage. The private producers also argue that on balance more risk is shifted away from utilities than to them, and that incentives for reliability are strong. In this study we examine the project finance mechanisms used in private power lending in detail, relying on a sample of actual loan documents. This review and its findings should be relevant to the further evolution of this debate. State regulatory commissions are likely to be interested in it, and Federal legislation to amend the Public Utility Holding Company Act (PUHCA) could require states to consider the implications of debt leveraging in relation to their oversight of utility power purchase programs

  11. Analysis of debt leveraging in private power projects

    Energy Technology Data Exchange (ETDEWEB)

    Kahn, E.P. (Lawrence Berkeley Lab., CA (United States)); Meal, M.; Doerrer, S.; Morse, S. (Morse, Richard, Weisenmiller Associates, Inc., Oakland, CA (United States))

    1992-08-01

    As private power has grown to become a significant part of the electricity system, increasing concern about its financial implications has arisen. In many cases, the source of this concern has been the substantial reliance of these projects on debt financing. This study examines debt leveraging in private power projects. The policy debate on these issues has typically been conducted at a high level of generality. Critics of the private power industry assert that high debt leveraging confers an unfair competitive advantage by lowering the cost of capital. This leveraging is only possible because risks are shifted to the utility. Further, debt leveraging is claimed to be a threat to reliability. On the opposite side, it is argued that debt leveraging imposes costs and obligations not borne by utilities, and so there is no financial advantage. The private producers also argue that on balance more risk is shifted away from utilities than to them, and that incentives for reliability are strong. In this study we examine the project finance mechanisms used in private power lending in detail, relying on a sample of actual loan documents. This review and its findings should be relevant to the further evolution of this debate. State regulatory commissions are likely to be interested in it, and Federal legislation to amend the Public Utility Holding Company Act (PUHCA) could require states to consider the implications of debt leveraging in relation to their oversight of utility power purchase programs.

  12. Environmental impact assessment of transportation projects: An analysis using an integrated GIS, remote sensing, and spatial modeling approach

    Science.gov (United States)

    El-Gafy, Mohamed Anwar

    Transportation projects will have impact on the environment. The general environmental pollution and damage caused by roads is closely associated with the level of economic activity. Although Environmental Impact Assessments (EIAs) are dependent on geo-spatial information in order to make an assessment, there are no rules per se how to conduct an environmental assessment. Also, the particular objective of each assessment is dictated case-by-case, based on what information and analyses are required. The conventional way of Environmental Impact Assessment (EIA) study is a time consuming process because it has large number of dependent and independent variables which have to be taken into account, which also have different consequences. With the emergence of satellite remote sensing technology and Geographic Information Systems (GIS), this research presents a new framework for the analysis phase of the Environmental Impact Assessment (EIA) for transportation projects based on the integration between remote sensing technology, geographic information systems, and spatial modeling. By integrating the merits of the map overlay method and the matrix method, the framework analyzes comprehensively the environmental vulnerability around the road and its impact on the environment. This framework is expected to: (1) improve the quality of the decision making process, (2) be applied both to urban and inter-urban projects, regardless of transport mode, and (3) present the data and make the appropriate analysis to support the decision of the decision-makers and allow them to present these data to the public hearings in a simple manner. Case studies, transportation projects in the State of Florida, were analyzed to illustrate the use of the decision support framework and demonstrate its capabilities. This cohesive and integrated system will facilitate rational decisions through cost effective coordination of environmental information and data management that can be tailored to

  13. Sparse Regression by Projection and Sparse Discriminant Analysis

    KAUST Repository

    Qi, Xin; Luo, Ruiyan; Carroll, Raymond J.; Zhao, Hongyu

    2015-01-01

    predictions. We introduce a new framework, regression by projection, and its sparse version to analyze high-dimensional data. The unique nature of this framework is that the directions of the regression coefficients are inferred first, and the lengths

  14. [Analysis of funding of projects on obstetrics and gynecology supported by National Natural Science Foundation of China from 2007 to 2016].

    Science.gov (United States)

    Qin, S H; Huang, Q S; Yao, S Z

    2017-04-25

    Objective: To summarize the funding of scientific research projects on obstetrics and gynecology by National Natural Science Foundation of China (NSFC) from 2007 to 2016 and to display the hotspots of scientific research on obstetrics and gynecology. Methods: A systemic search was performed for the information of projects supported by NSFC from 2007 to 2016. The indicators for analysis included the number of projects, total investment, project categories, research units and research field. The research direction of each project was decided based on title, summary and key words provided by the profile of each project. Results: The total investment on obstetrics and gynecology by NSFC was 23.214 million with a total of 82 projects in 2007. It increased year by year and reached the peak in 2014 (359 projects 208.990 million). The investment and number of projects remained stable after 2014. General projects (1 109 projects 608.000 million) formed the majority of projects. Youth science fund projects (1 035 projects 214.976 million) increased steadily and the number was nearly equal to general projects. There were only a small amount of key projects (20 projects 54.720 million) and major projects (7 projects 38.400 million). The investment varied in different research units. The greatest 10 units (less than 6% of total), including 7 comprehensive universities, 2 medical universities and 1 institute of medicine, got 1 113 projects invested (43.84% of total, 1 113/2 539). The hot areas like gynecological tumor (920 projects 350.615 million), hypertensive disorders complicating pregnancy (91 projects 37.470 million) and polycystic ovarian syndrome (77 projects 29.540 million) were more likely to receive investment, while some interdisciplinary science like maternal and child health (28 projects 12.050 million), imaging and biomedicine (37 projects 14.770 million) began to achieve attention in recent years. Conclusions: The number of researches invested will be increased

  15. 75 FR 8036 - Monitor-Hot Creek Rangeland Project

    Science.gov (United States)

    2010-02-23

    ... DEPARTMENT OF AGRICULTURE Forest Service Monitor-Hot Creek Rangeland Project AGENCY: Forest... Rangeland Project area. The analysis will determine if a change in management direction for livestock grazing is needed to move existing resource conditions within the Monitor-Hot Creek Rangeland Project area...

  16. Tourism Chains and Pro-Poor Tourism Development: An Actor-Network Analysis of a Pilot Project in Costa Rica

    NARCIS (Netherlands)

    Duim, van der V.R.; Caalders, J.D.A.D.

    2008-01-01

    This paper analyses a pilot project in Costa Rica aimed to examine and improve the market linkages of 24 small-scale tourism initiatives to tour operators in Costa Rica and the Netherlands. It links pro-poor tourism and the concept of tourism chain to actor-network theory. The analysis shows that

  17. Project-service Solutions in the Yacht Industry: a Value-Chain Analysis

    Directory of Open Access Journals (Sweden)

    Davide Aloini

    2013-10-01

    economic trend, in particular throughout the delivery of integrated project-service solutions in all project life cycle stages. Innovative value offerings encompass a complex network of suppliers and subcontractors that is not stable and is arranged in a sporadic and unpredictable manner. Multiple case studies in the yacht industry were conducted to explore the configuration of project-service solutions. The research constitutes an original contribution to studies on servitization adoption in an industrial project context from an inter-organizational perspective. It emerged that SMEs reorganize themselves, in order to provide flexible on-demand solutions to customers, by including all the capabilities within their network. Newly arising professional roles are oriented to the implementation of smart networks and are focused on service infusion in order to provide increased customer value.

  18. Evaluation of the Safety Analysis Report for the Waste Isolation Pilot Plant Project

    International Nuclear Information System (INIS)

    Little, M.S.

    1985-05-01

    The Safety Analysis Report (SAR) for the Waste Isolation Pilot Plant (WIPP) Project was first published by the US Department of Energy (DOE), WIPP Project Office (WPO) in 1980. Since that time a total of eight amendments to this Report have been published. As part of its independent evaluation of the WIPP Project for the State of New Mexico, the Environmental Evaluation Group (EEG) maintains a continuing technical assessment of the information in this Report and its amendments. Beginning with the initial publication, and following the amendments, the EEG prepares detailed written comments and recommendations which are submitted to the WPO for consideration in future amendments. The WPO has made many substantial changes to the SAR in response to the EEG's comments. On frequent occasions, meetings between the two groups have been held in an effort to reach an accord on some of the more controversial issues. These meetings generally have been very constructive, but several important areas of conflict remain. In many instances, these areas represent changes which are to be considered by the WPO at some future date, rather than irreconcilable issues. The most important issues remaining to be resolved are included in the discussions of this report, and could be summarized as follows: (1) An amendment of the topical content to be more in accord with the DOE Order 5481.1A and AL 5481.1A. (2) Substantial revisions of the classification of components, structures and systems, and related quality assurance. (3) Revisions to the site geological and hydrologic data based on studies agreed to between DOE and the State

  19. Projected photovoltaic energy impacts on US CO2 emissions: an integrated energy environmental-economic analysis

    International Nuclear Information System (INIS)

    Lee, J.C.; Fthenakis, V.M.; Morris, S.C.; Goldstein, G.A.; Moskowitz, P.D.

    1997-01-01

    The potential role of photovoltaic technologies in reducing carbon dioxide (CO 2 ) emissions in the USA was evaluated using an energy-environment-economic systems model. With a range of assumptions about future scenarios up to 2030, the model results provide an objective quantitative assessment of the prospects for photovoltaics in a competitive market. With the projected improvements in cost and efficiency, photovoltaics will compete favourably as a general source of electricity supply to the grid by about 2010 in southwestern USA. This analysis indicates that photovoltaics has the potential to reach a total installed capacity of 140 GW by the year 2030, and to displace a cumulative 450 million metric tons of carbon emissions from 1995 to 2030. At the projected 2030 capacity, photovoltaics could displace over 64 million metric tons of carbon emissions a year. Under constraints on carbon emissions, photovoltaics becomes more cost effective and would further reduce carbon emissions from the US energy system. (author)

  20. American fuel cell bus project : first analysis report.

    Science.gov (United States)

    2013-06-01

    This report summarizes the experience and early results from the American Fuel Cell Bus Project, a fuel cell electric bus demonstration : funded by the Federal Transit Administration (FTA) under the National Fuel Cell Bus Program. A team led by CALST...