WorldWideScience

Sample records for project technical monitor

  1. River Corridor Project Workplace Air Monitoring Technical Basis

    International Nuclear Information System (INIS)

    MANTOOTH, D.S.

    2001-01-01

    This document provides the technical basis by which the workplace air monitoring and sampling program is operated in the River Corridor Project (RCP). Revision 2 addresses and incorporates changes in the air monitoring program drivers and implementing documents which occurred after the previous revision was issued. This revision also includes an additional RCP project to make Revision 2 applicable to the entire RCP. These changes occurred in the following areas: (1) Changes resulting from the conversion of the Hanford Site Radiological Control Manual (HSRCM-1) into the Project Hanford Radiological Control Manual (F-5173). HNF-5173 is now the implementing document for 10CFR835. (2) Changes resulting from the issue of new and revised Hanford Site implementing procedures. (3) Changes resulting from the issue of new and revised, as well as the cancellation of RCP implementing procedures. (4) Addition of the 200 Area Accelerated Deactivation Project (ADP). (5) Modification of some air sampling/monitoring locations to better meet the needs of facility operations. (6) Changes resulting from the RCP reorganization

  2. A Socio-Technical Perspective on Repository Monitoring - 12229

    Energy Technology Data Exchange (ETDEWEB)

    Bergmans, Anne [University of Antwerp, Faculty of Political and Social Sciences, Sint-Jacobstraat 2, 2000 Antwerpen (Belgium); Elam, Mark; Sundqvist, Goeran [University of Gothenburg, Department of Sociology, Box 720, 40530 Gothenburg (Sweden); Simmons, Peter [University of East Anglia, School of Environmental Sciences, Norwich NR4 7TJ (United Kingdom)

    2012-07-01

    Monitoring geological repositories for high-activity radioactive wastes has both technical and social dimensions, which are closely interrelated. To investigate the implications of this for geological disposal, data on experts' expectations of repository monitoring and the functions that it is expected to serve were analysed. The analysis drew on strategic and technical documents on monitoring produced by national agencies and by international organisations or projects; interviews with specialists in radioactive waste management organisations on monitoring and on their perceptions of societal concerns and expectations; and observations from technical workshops on repository monitoring. Three main rationales for monitoring were found: performance confirmation; decision support in a step-wise process; and public and stakeholder confidence building. The expectation that monitoring will enhance public confidence is then examined from a social scientific perspective and the potential for and challenges to using monitoring in this way are reviewed. In conclusion, implications for stakeholder engagement in the development of monitoring objectives and strategies are discussed. (authors)

  3. Project W-420 stack monitoring system upgrades

    International Nuclear Information System (INIS)

    CARPENTER, K.E.

    1999-01-01

    This project will execute the design, procurement, construction, startup, and turnover activities for upgrades to the stack monitoring system on selected Tank Waste Remediation System (TWRS) ventilation systems. In this plan, the technical, schedule, and cost baselines are identified, and the roles and responsibilities of project participants are defined for managing the Stack Monitoring System Upgrades, Project W-420

  4. Spring Chinook Supplementation Monitoring; Yakima Fisheries Project Management Plan, 1996 Technical Report.

    Energy Technology Data Exchange (ETDEWEB)

    Busack, Craig A. (Washington Department of Fish and Wildlife, Olympia, WA); Watson, Bruce; Johnston, Mark (Confederated Tribes and Bands of the Yakama Nation, Fisheries Resource Management, Toppenish, WA)

    1997-08-01

    The Yakima Fisheries Project (YFP), a key element in the Northwest Power Planning Council's Fish and Wildlife Program, has been in planning for more than ten years. It was initially conceived as, and is still intended to be, a multipurpose project. Besides increasing fish production in the Yakima basin, it is also intended to yield information about supplementation that will be of value to the entire Columbia basin, and hopefully the entire region. Because of this expectation of increased knowledge resulting from the project, a large and comprehensive monitoring program has always been seen as an integral part of the project. Despite the importance of monitoring to the project, monitoring planning has been slow to develop. The only general written statement of monitoring planning for the project is Chapter 9 of the current Project Status Report (PSR), written in 1993. That document is a reasonably good overview, and presents some important basic principles of monitoring, but is decidedly lacking in specifics. Throughout 1996 the Monitoring Implementation and Planning Team (MIPT), an interdisciplinary group of biologists who have worked on the project for several years, worked to develop a comprehensive spring chinook monitoring plan for the project. The result is the present document.

  5. Monitoring as component for the decision making in final repository projects; Monitoring als Baustein fuer die Entscheidungsfindung in Endlagerprojekten

    Energy Technology Data Exchange (ETDEWEB)

    Kallenbach-Herbert, Beate; Alt, Stefan [Oeko-Institut e.V., Darmstadt (Germany)

    2012-12-15

    The monitoring in final radioactive waste repositories is performed by continuous or repeated measurements of technical and geologic parameters during long time periods. The collected data serve manifold purposes. The central focus is to provide fundamental information for the decision between and within the three phases of a final repository project. This means that monitoring is not only the sum of technical surveillance measures. Monitoring is also important for several sociopolitical decisions, for instance in case of closure of the repository. The article discusses possible objectives and shows the relevant technical aspects that are used deduce the requirements for an integrated monitoring concept. It is shown that a monitoring concept should be developed early enough involving all groups that are concerned by the waste disposal project.

  6. Monitored Geologic Repository Project Description Document

    International Nuclear Information System (INIS)

    Curry, P. M.

    2001-01-01

    The primary objective of the Monitored Geologic Repository Project Description Document (PDD) is to allocate the functions, requirements, and assumptions to the systems at Level 5 of the Civilian Radioactive Waste Management System (CRWMS) architecture identified in Section 4. It provides traceability of the requirements to those contained in Section 3 of the ''Monitored Geologic Repository Requirements Document'' (MGR RD) (YMP 2000a) and other higher-level requirements documents. In addition, the PDD allocates design related assumptions to work products of non-design organizations. The document provides Monitored Geologic Repository (MGR) technical requirements in support of design and performance assessment in preparing for the Site Recommendation (SR) and License Application (LA) milestones. The technical requirements documented in the PDD are to be captured in the System Description Documents (SDDs) which address each of the systems at Level 5 of the CRWMS architecture. The design engineers obtain the technical requirements from the SDDs and by reference from the SDDs to the PDD. The design organizations and other organizations will obtain design related assumptions directly from the PDD. These organizations may establish additional assumptions for their individual activities, but such assumptions are not to conflict with the assumptions in the PDD. The PDD will serve as the primary link between the technical requirements captured in the SDDs and the design requirements captured in US Department of Energy (DOE) documents. The approved PDD is placed under Level 3 baseline control by the CRWMS Management and Operating Contractor (M and O) and the following portions of the PDD constitute the Technical Design Baseline for the MGR: the design characteristics listed in Table 1-1, the MGR Architecture (Section 4.1), the Technical Requirements (Section 5), and the Controlled Project Assumptions (Section 6)

  7. River Protection Project waste feed delivery program technical performance measurement assessment plan

    International Nuclear Information System (INIS)

    O'TOOLE, S.M.

    1999-01-01

    This plan establishes a formal technical performance-monitoring program. Technical performance is assessed by establishing requirements based performance goals at the beginning of a program and routinely evaluating progress in meeting these goals at predetermined milestones throughout the project life cycle

  8. Near-Facility Environmental Monitoring Quality Assurance Project Plan

    International Nuclear Information System (INIS)

    MCKINNEY, S.M.

    2000-01-01

    This Quality Assurance Project Plan addresses the quality assurance requirements for the activities associated with the preoperational and near-facility environmental monitoring directed by Waste Management Technical Services and supersedes HNF-EP-0538-4. This plan applies to all sampling and monitoring activities performed by Waste Management Technical Services in implementing near-facility environmental monitoring at the Hanford Site. This Quality Assurance Project Plan is required by U.S. Department of Energy Order 5400.1 (DOE 1990) as a part of the Environmental Monitoring Plan (DOE-RL 1997) and is used to define: Environmental measurement and sampling locations used to monitor environmental contaminants near active and inactive facilities and waste storage and disposal sites; Procedures and equipment needed to perform the measurement and sampling; Frequency and analyses required for each measurement and sampling location; Minimum detection level and accuracy; Quality assurance components; and Investigation levels. Near-facility environmental monitoring for the Hanford Site is conducted in accordance with the requirements of U.S. Department of Energy Orders 5400.1 (DOE 1990), 5400.5 (DOE 1993), 5484.1 (DOE 1990), and 435.1 (DOE 1999), and DOE/EH-O173T (DOE 1991). It is Waste Management Technical Services' objective to manage and conduct near-facility environmental monitoring activities at the Hanford Site in a cost-effective and environmentally responsible manner that is in compliance with the letter and spirit of these regulations and other environmental regulations, statutes, and standards

  9. Technical infrastructure monitoring from the CCC

    CERN Document Server

    Stowisek, J; Suwalska, A; CERN. Geneva. TS Department

    2005-01-01

    In the summer of 2005, the Technical Infrastructure Monitoring (TIM) system will replace the Technical Data Server (TDS) as the monitoring system of CERN’s technical services. Whereas the TDS was designed for the LEP, TIM will have to cope with the much more extensive monitoring needs of the LHC era. To cater for this, the new system has been built on industry-standard hardware and software components, using Java 2 Enterprise Edition (J2EE) technology to create a highly available, reliable, scalable and flexible control system. A first version of TIM providing the essential functionality will be deployed in the MCR in June 2005. Additional functionality and more sophisticated tools for system maintenance will be ready before the start-up of the LHC in 2007, when CERN’s technical infrastructure will be monitored from the future CERN Control Centre.

  10. UMTRA project technical assistance contractor quality assurance implementation plan for surface and ground water

    International Nuclear Information System (INIS)

    1994-09-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Technical Assistance Contractor (TAC) Quality Assurance Implementation Plan (QAIP) outlines the primary requirements for integrating quality functions for TAC technical activities applied to the surface and ground water phases of the UMTRA Project. The QAIP is subordinate to the latest issue of the UMTRA Project TAC Quality Assurance Program Plan (QAPP). The QAIP addresses technical aspects of the TAC UMTRA Project surface and ground water programs. The QAIP is authorized and approved by the TAC Project Manager and QA manager. The QA program is designed to use monitoring, audit, and surveillance functions as management tools to ensure that all Project organization activities are carried out in a manner that will protect public health and safety, promote the success of the UMTRA Project and meet or exceed contract requirements

  11. UMTRA project technical assistance contractor quality assurance implementation plan for surface and ground water, Revision 2

    International Nuclear Information System (INIS)

    1995-11-01

    This document contains the Technical Assistance Contractor (TAC) Quality Assurance Implementation Plan (QAIP) for the Uranium Mill Tailings Remedial Action (UMTRA) Project. The QAIP outlines the primary requirements for integrating quality functions for TAC technical activities applied to the surface and ground water phases of the UMTRA Project. The QA program is designed to use monitoring, audit, and surveillance activities as management tools to ensure that UMTRA Project activities are carried out in amanner to protect public health and safety, promote the success of the UMTRA Project, and meet or exceed contract requirements

  12. Conjoint utility analysis of technical maturity and project progress of construction project

    Directory of Open Access Journals (Sweden)

    Ma Wei

    2016-01-01

    Full Text Available In this paper, taking construction project as the research object, the relationship between the project maturity index calculated by the construction project technical risks with different fine degree and the project progress index is studied, and the equilibrium relationship between the Party A’s utility curve and the Party B’s cost curve of using project maturity index and project progress index as the research variables is analyzed. The results show that, when the construction project technical risk division is more precise, the conjoint utility of the project's technical maturity index and the project progress is higher, and the project’s Party A and Party B two sides are closer to the optimal equilibrium. This shows that the construction project technical risk must be finely divided, and managed and controlled respectively, which will help to improve the conjoint utility of the project Party A and Party B two sides.

  13. TECHNICAL RISK RATING OF DOE ENVIRONMENTAL PROJECTS - 9153

    International Nuclear Information System (INIS)

    Cercy, M.; Fayfich, Ronald; Schneider, Steven P.

    2008-01-01

    The U.S. Department of Energy's Office of Environmental Management (DOE-EM) was established to achieve the safe and compliant disposition of legacy wastes and facilities from defense nuclear applications. The scope of work is diverse, with projects ranging from single acquisitions to collections of projects and operations that span several decades and costs from hundreds of millions to billions US$. The need to be able to manage and understand the technical risks from the project to senior management level has been recognized as an enabler to successfully completing the mission. In 2008, DOE-EM developed the Technical Risk Rating as a new method to assist in managing technical risk based on specific criteria. The Technical Risk Rating, and the criteria used to determine the rating, provides a mechanism to foster open, meaningful communication between the Federal Project Directors and DOE-EM management concerning project technical risks. Four indicators (technical maturity, risk urgency, handling difficulty and resolution path) are used to focus attention on the issues and key aspects related to the risks. Pressing risk issues are brought to the forefront, keeping DOE-EM management informed and engaged such that they fully understand risk impact. Use of the Technical Risk Rating and criteria during reviews provides the Federal Project Directors the opportunity to openly discuss the most significant risks and assists in the management of technical risks across the portfolio of DOE-EM projects. Technical Risk Ratings can be applied to all projects in government and private industry. This paper will present the methodology and criteria for Technical Risk Ratings, and provide specific examples from DOE-EM projects

  14. Preservation of Records, Knowledge and Memory across Generations (RK and M). Monitoring of Geological Disposal Facilities - Technical and Societal Aspects

    International Nuclear Information System (INIS)

    2014-01-01

    The OECD Nuclear Energy Agency (NEA) Radioactive Waste Management Committee (RWMC) Project on 'Preservation of Records, Knowledge and Memory across generations (RK and M)' (2011-2014) explores and aims to develop guidance on regulatory, policy, managerial, and technical aspects of long-term preservation of records, knowledge and memory of deep geological disposal facilities. While official responsibility for the preservation of records, knowledge and memory must remain with institutions, it is likely that local communities do or will have an important pragmatic role in maintaining the memory of a repository, e.g., by engaging at some level in its continued oversight. Monitoring - by collecting, interpreting and keeping data on a continuous basis - would serve the purpose of preserving records, knowledge and memory and continuous oversight. In order to tackle the subject it is important, on the one hand, to describe the role of monitoring in a technical perspective and, on the other, to understand the expectations of local stakeholders regarding monitoring. The present study report should therefore meet three objectives: - To present in a comprehensive way the general monitoring information, practices and approaches used in the various national geological disposal programmes and elaborated in a number of international projects; - To explore the role, needs and expectations of local communities regarding monitoring and RK and M preservation of deep geological repositories; - Based on the above review, to identify lessons learned and the rationale for monitoring geological disposal projects throughout their life-cycle stages. This report is based on two studies: an NEA internal report entitled 'Monitoring of Geological Disposal Facilities (August 2013)' which provides an overview on technical aspects of monitoring and an NEA public report entitled 'Local Communities' Expectations and Demands on Monitoring and the Preservation of Records, Knowledge and Memory of a Deep

  15. A real-time stack radioactivity monitoring system and dose projection program

    Energy Technology Data Exchange (ETDEWEB)

    Hull, A.P.; Michael, P.A. [Brookhaven National Laboratory, Upton, NY (United States); Bernstein, H.J. [Bernstein & Sons, Bellport, NY (United States)

    1995-02-01

    At Brookhaven National Laboratory, a commercial Low- and High-Range Air Effluent Monitor has become operational at the 60 Mw (t) High Flux Beam Reactor. Its output data is combined with that from ground-level and elevated meteorological sensors to provide a real-time projection of the down-wind dose rates from noble gases and radioiodines released from the HFBR`s 100 m stack. The output of the monitor, and the meteorological sensors and the dose projections can be viewed at emergency response terminals located in the Reactor Control Room, its Technical Support Center and at the laboratory`s separately located Meteorological Station and Monitoring and Assessment Center.

  16. Modern Project: monitoring developments for safe repository operation and staged closure

    International Nuclear Information System (INIS)

    Mayer, S.; Ouchhi, S.; Verstricht, J.; Maurer, H.; Breen, B.

    2010-01-01

    Document available in extended abstract form only. In a first part, the overall objectives of the MoDeRn project (Monitoring Developments for safe Repository operation and stage closure project) are presented. MoDeRn is a four year (2009-2013) collaborative project co-funded under the 7. Framework Program for Nuclear Research and Training (EURATOM). It involves 17 organizations responsible for research into radioactive waste management in the European Union, United States, Japan and Switzerland, with partners with extensive experience in monitoring activities in underground research laboratories (URL); as well as research institutes and universities with substantial experience in research on socio-technical interactions and public and stakeholder engagement. An overview of the project work packages and of their interdependencies is given. The successful implementation of a repository program for radioactive waste relies on both the technical aspects of a sound safety strategy and scientific and engineering excellence as well as on social aspects such as stakeholder acceptance and confidence. Monitoring is considered key in serving both technical and social objectives. It is not only essential to underpin the technical safety strategy and quality of the engineering, but it can also be an important tool for public communication, contributing to public understanding of and confidence in the repository behaviour. By inclusion of specific national contexts of waste management programs in different countries, the MoDeRn project aims at providing a reference framework for development and implementation of monitoring activities. This will be achieved by stakeholder engagement during all identifiable phases of the radioactive waste disposal process. Thus, site characterisation, construction, operation and staged closure, as well as post-closure institutional control phases have to be addressed. MoDeRn considers different host rock types, such as salt, tuff, crystalline rock

  17. The Future of Project Management in Technical Communication

    DEFF Research Database (Denmark)

    Kampf, Constance

    2006-01-01

    Project Management increasing shapes workplace communication, especially when technical commuicators participate in cross-disciplinary development teams. This paper looks at the future of project management in technical communication and argues for a communicative approach to project management...... for technical communication students. The Project Management course in the International Bachelor Program of Marketing and Management Communication at the Aarhus School of Business is described, and the implications fortechnical communication curricula are discussed....

  18. International Collaboration on Building Local Technical Capacities for Monitoring Volcanic Activity at Pacaya Volcano, Guatemala.

    Science.gov (United States)

    Escobar-Wolf, R. P.; Chigna, G.; Morales, H.; Waite, G. P.; Oommen, T.; Lechner, H. N.

    2015-12-01

    Pacaya volcano is a frequently active and potentially dangerous volcano situated in the Guatemalan volcanic arc. It is also a National Park and a major touristic attraction, constituting an important economic resource for local municipality and the nearby communities. Recent eruptions have caused fatalities and extensive damage to nearby communities, highlighting the need for risk management and loss reduction from the volcanic activity. Volcanic monitoring at Pacaya is done by the Instituto Nacional de Sismologia, Vulcanologia, Meteorologia e Hidrologia (INSIVUMEH), instrumentally through one short period seismic station, and visually by the Parque Nacional Volcan de Pacaya y Laguna de Calderas (PNVPLC) personnel. We carry out a project to increase the local technical capacities for monitoring volcanic activity at Pacaya. Funding for the project comes from the Society of Exploration Geophysicists through the Geoscientists Without Borders program. Three seismic and continuous GPS stations will be installed at locations within 5 km from the main vent at Pacaya, and one webcam will aid in the visual monitoring tasks. Local educational and outreach components of the project include technical workshops on data monitoring use, and short thesis projects with the San Carlos University in Guatemala. A small permanent exhibit at the PNVPLC museum or visitor center, focusing on the volcano's history, hazards and resources, will also be established as part of the project. The strategy to involve a diverse group of local collaborators in Guatemala aims to increase the chances for long term sustainability of the project, and relies not only on transferring technology but also the "know-how" to make that technology useful. Although not a primary research project, it builds on a relationship of years of joint research projects at Pacaya between the participants, and could be a model of how to increase the broader impacts of such long term collaboration partnerships.

  19. Salt Repository Project: FY 85 technical project plan

    International Nuclear Information System (INIS)

    1985-07-01

    The FY 85 technical plan for the Salt Repository Project is briefly presented. The objectives of the project in relation to the Civilian Radioactive Waste Management Program are discussed, and the technical activities directed toward accomplishing these objectives are detailed. A budget is presented for each of the Level 2 work breakdown structure tasks (Systems, Waste Package, Site, Repository, Regulatory and Institutional, Exploratory Shaft, Test Facilities, Land Acquisition, and Project Management) in the various sections. An overall description, current status, and planned activities are presented for each of the subtasks which make up the above-mentioned Level 2 tasks. A strategy diagram and a master schedule are included and each of the milestones is also listed chronologically in the sections

  20. Identification of technical guidance related to ground water monitoring

    Energy Technology Data Exchange (ETDEWEB)

    Vogelsberger, R.R.; Smith, E.D.; Broz, M.; Wright, J.C. Jr.

    1987-05-01

    Monitoring of ground water quality is a key element of ground water protection and is mandated by several federal and state laws concerned with water quality or waste management. Numerous regulatory guidance documents and technical reports discuss various aspects of ground water monitoring, but at present there is no single source of guidance on procedures and practices for ground water monitoring. This report is intended to assist US Department of Energy (DOE) officials and facility operating personnel in identifying sources of guidance for developing and implementing ground water monitoring programs that are technically sound and that comply with applicable regulations. Federal statutes and associated regulations were reviewed to identify requirements related to ground water monitoring, and over 160 documents on topics related to ground water monitoring were evaluated for their technical merit, their utility as guidance for regulatory compliance, and their relevance to DOE's needs. For each of 15 technical topics involved in ground water monitoring, the report presents (1) a review of federal regulatory requirements and representative state requirements, (2) brief descriptions of the contents and merits of available guidance documents and technical references, and (3) recommendations of the guidance documents or other technical resources that appear to be most appropriate for use in DOE's monitoring activities. The contents of the report are applicable to monitoring activities involving both radioactive and nonradioactive substances. The main sources of regulatory requirements considered in the report are the Atomic Energy Act (including the Uranium Mill Tailings Radiation Control Act), Resource Conservation and Recovery Act, Comprehensive Environmental Response, Compensation and Liability Act, Safe Drinking Water Act, Toxic Substances Control Act, and Federal Water Pollution Control Act.

  1. Identification of technical guidance related to ground water monitoring

    International Nuclear Information System (INIS)

    Vogelsberger, R.R.; Smith, E.D.; Broz, M.; Wright, J.C. Jr.

    1987-05-01

    Monitoring of ground water quality is a key element of ground water protection and is mandated by several federal and state laws concerned with water quality or waste management. Numerous regulatory guidance documents and technical reports discuss various aspects of ground water monitoring, but at present there is no single source of guidance on procedures and practices for ground water monitoring. This report is intended to assist US Department of Energy (DOE) officials and facility operating personnel in identifying sources of guidance for developing and implementing ground water monitoring programs that are technically sound and that comply with applicable regulations. Federal statutes and associated regulations were reviewed to identify requirements related to ground water monitoring, and over 160 documents on topics related to ground water monitoring were evaluated for their technical merit, their utility as guidance for regulatory compliance, and their relevance to DOE's needs. For each of 15 technical topics involved in ground water monitoring, the report presents (1) a review of federal regulatory requirements and representative state requirements, (2) brief descriptions of the contents and merits of available guidance documents and technical references, and (3) recommendations of the guidance documents or other technical resources that appear to be most appropriate for use in DOE's monitoring activities. The contents of the report are applicable to monitoring activities involving both radioactive and nonradioactive substances. The main sources of regulatory requirements considered in the report are the Atomic Energy Act (including the Uranium Mill Tailings Radiation Control Act), Resource Conservation and Recovery Act, Comprehensive Environmental Response, Compensation and Liability Act, Safe Drinking Water Act, Toxic Substances Control Act, and Federal Water Pollution Control Act

  2. A technical system to improve the operational monitoring of the Zaporozhye nuclear power plant

    Energy Technology Data Exchange (ETDEWEB)

    Beyer, M; Carl, H; Nowak, K [Technischer Ueberwachungsverein Rheinland, Koeln (Germany). Inst. for Nuclear Engineering and Radiation Protection; Schumann, P; Seidel, A; Weiss, F P; Zschau, J

    1998-10-01

    As part of the programme implemented by the German Ministry of Environment, Nature Conservation and Reactor Safety to cooperate with the Central and Eastern European States (CEES) and the Commonwealth of Independent States (CIS) in the area of nuclear safety, a technical system to improve operational monitoring has been designed, specified and established since 1992 as a pilot project in the Zaporozhye/Ukraine nuclear power plant by Forschungszentrum Rossendorf and Technischer Ueberwachungsverein Rheinland with a significant contribution from the State Scientific and Technical Centre of the Ukrainian supervisory authority. The technical system complements existing operational checking and monitoring facilities by including modern means of information technology. It enables a continuous monitoring of the state of unit 5 in normal operation and in cases of anomalies or incidents so that when recognisable deviations from the regular plant operation occur, the Ukrainian supervisory authority can immediately inquire and if necessary impose conditions on the operator. The radiological and meteorological parameters at the nuclear power plant location are monitored to the extent necessary to assess the current radiation situation and to implement efficient emergency management measures. (orig.)

  3. A technical system to improve the operational monitoring of the Zaporozhye nuclear power plant

    International Nuclear Information System (INIS)

    Beyer, M.; Carl, H.; Nowak, K.; Schumann, P.; Seidel, A.; Weiss, F.P.; Zschau, J.

    1998-01-01

    As part of the programme implemented by the German Ministry of Environment, Nature Conservation and Reactor Safety to cooperate with the Central and Eastern European States (CEES) and the Commonwealth of Independent States (CIS) in the area of nuclear safety, a technical system to improve operational monitoring has been designed, specified and established since 1992 as a pilot project in the Zaporozhye/Ukraine nuclear power plant by Forschungszentrum Rossendorf and Technischer Ueberwachungsverein Rheinland with a significant contribution from the State Scientific and Technical Centre of the Ukrainian supervisory authority. The technical system complements existing operational checking and monitoring facilities by including modern means of information technology. It enables a continuous monitoring of the state of unit 5 in normal operation and in cases of anomalies or incidents so that when recognisable deviations from the regular plant operation occur, the Ukrainian supervisory authority can immediately inquire and if necessary impose conditions on the operator. The radiological and meteorological parameters at the nuclear power plant location are monitored to the extent necessary to assess the current radiation situation and to implement efficient emergency management measures. (orig.)

  4. Admiralty Inlet Pilot Tidal Project Final Technical Report

    Energy Technology Data Exchange (ETDEWEB)

    Collar, Craig [Public Utility District No. 1 of Snohomish County, Everett, WA (United States)

    2015-09-14

    This document represents the final report for the Admiralty Inlet Pilot Tidal Project, located in Puget Sound, Washington, United States. The Project purpose was to license, permit, and install a grid-connected deep-water tidal turbine array (two turbines) to be used as a platform to gather operational and environmental data on tidal energy generation. The data could then be used to better inform the viability of commercial tidal energy generation from technical, economic, social, and environmental standpoints. This data would serve as a critical step towards the responsible advancement of commercial scale tidal energy in the United States and around the world. In late 2014, Project activities were discontinued due to escalating costs, and the DOE award was terminated in early 2015. Permitting, licensing, and engineering design activities were completed under this award. Final design, deployment, operation, and monitoring were not completed. This report discusses the results and accomplishments achieved under the subject award.

  5. Final Technical Report: Development of Post-Installation Monitoring Capabilities

    Energy Technology Data Exchange (ETDEWEB)

    Polagye, Brian [University of Washington

    2014-03-31

    The development of approaches to harness marine and hydrokinetic energy at large-scale is predicated on the compatibility of these generation technologies with the marine environment. At present, aspects of this compatibility are uncertain. Demonstration projects provide an opportunity to address these uncertainties in a way that moves the entire industry forward. However, the monitoring capabilities to realize these advances are often under-developed in comparison to the marine and hydrokinetic energy technologies being studied. Public Utility District No. 1 of Snohomish County has proposed to deploy two 6-meter diameter tidal turbines manufactured by OpenHydro in northern Admiralty Inlet, Puget Sound, Washington. The goal of this deployment is to provide information about the environmental, technical, and economic performance of such turbines that can advance the development of larger-scale tidal energy projects, both in the United States and internationally. The objective of this particular project was to develop environmental monitoring plans in collaboration with resource agencies, while simultaneously advancing the capabilities of monitoring technologies to the point that they could be realistically implemented as part of these plans. In this, the District was joined by researchers at the Northwest National Marine Renewable Energy Center at the University of Washington, Sea Mammal Research Unit, LLC, H.T. Harvey & Associates, and Pacific Northwest National Laboratory. Over a two year period, the project team successfully developed four environmental monitoring and mitigation plans that were adopted as a condition of the operating license for the demonstration project that issued by the Federal Energy Regulatory Commission in March 2014. These plans address nearturbine interactions with marine animals, the sound produced by the turbines, marine mammal behavioral changes associated with the turbines, and changes to benthic habitat associated with colonization

  6. Trojan technical specification verification project

    International Nuclear Information System (INIS)

    Bates, L.; Rickenback, M.

    1991-01-01

    The Trojan Technical Specification Verification (TTSV) project at the Trojan plant of Portland General Electric Company was motivated by the recognition that many numbers in the Trojan technical specifications (TTS) potentially lacked the consideration of instrument- and/or process-related errors. The plant setpoints were known to consider such errors, but many of the values associated with the limiting conditions for operation (LCO) did not. In addition, the existing plant instrument error analyses were based on industry values that do not reflect the Trojan plant-specific experience. The purpose of this project is to ensure that the Trojan plant setpoint and LCO values include plant-specific instrument error

  7. Salt Repository Project. FY-84 technical project plan

    International Nuclear Information System (INIS)

    1984-08-01

    The FY 84 technical plans for the Salt Repository Project (SRP) are briefly presented. The objectives of the project in relation to the Civilian Radioactive Waste Management (CRWM) program are discused and the technical activities directed toward accomplishing these objectives are detailed. A budget is presented for each of the Level 2 Work Breakdown Structure Tasks (Systems, Waste Package, Site, Repository, Regulatory and Institutional, Test Facilities, Exploratory Shaft, Land Acquisition, and Program Management) in an appendix. An overall description, current status, and planned activities are presented for each of the subtasks which make up the above-mentioned Level 2 tasks. Milestones and their definitions for the plan year, as well as milestones for the outyears are also presented at this same subtask level for each subtask

  8. Spent nuclear fuel project technical databook

    Energy Technology Data Exchange (ETDEWEB)

    Reilly, M.A.

    1998-07-22

    The Spent Nuclear Fuel (SNF) project technical databook provides project-approved summary tables of selected parameters and derived physical quantities, with nominal design and safety basis values. It contains the parameters necessary for a complete documentation basis of the SNF Project technical and safety baseline. The databook is presented in two volumes. Volume 1 presents K Basins SNF related information. Volume 2 (not yet available) will present selected sludge and water information, as it relates to the sludge and water removal projects. The values, within this databook, shall be used as the foundation for analyses, modeling, assumptions, or other input to SNF project safety analyses or design. All analysis and modeling using a parameter available in this databook are required to use and cite the appropriate associated value, and document any changes to those values (i.e., analysis assumptions, equipment conditions, etc). Characterization and analysis efforts are ongoing to validate, or update these values.

  9. Spent nuclear fuel project technical databook

    International Nuclear Information System (INIS)

    Reilly, M.A.

    1998-01-01

    The Spent Nuclear Fuel (SNF) project technical databook provides project-approved summary tables of selected parameters and derived physical quantities, with nominal design and safety basis values. It contains the parameters necessary for a complete documentation basis of the SNF Project technical and safety baseline. The databook is presented in two volumes. Volume 1 presents K Basins SNF related information. Volume 2 (not yet available) will present selected sludge and water information, as it relates to the sludge and water removal projects. The values, within this databook, shall be used as the foundation for analyses, modeling, assumptions, or other input to SNF project safety analyses or design. All analysis and modeling using a parameter available in this databook are required to use and cite the appropriate associated value, and document any changes to those values (i.e., analysis assumptions, equipment conditions, etc). Characterization and analysis efforts are ongoing to validate, or update these values

  10. Developing and implementing a monitoring programme: recommendations provided by the MODERN project

    International Nuclear Information System (INIS)

    Mayer, S.; Bergmans, A.; Garcia-Sineriz, J.L.; Breen, B.; Jobmann, M.

    2012-01-01

    Document available in extended abstract form only. The successful implementation of a repository programme relies on both the technical aspects of a sound safety strategy, and scientific and engineering excellence, as well as on social aspects such as public acceptance. Monitoring has the potential to contribute to both of these aspects and thus to play an important role as national radioactive waste disposal programmes move forward towards safe and accepted implementation of geological disposal. The main goal of the 'Monitoring Developments for Safe Repository Operation and staged Closure' (MoDeRn) Project is to take the state-of-the-art of broadly accepted, main monitoring objectives and to develop these to a level of description that is closer to the actual implementation of monitoring during the staged approach of the disposal process. It should be noted that the MoDeRn project recognizes the diversity of monitoring activities that will be required in a repository, in particular related to operational safety, nuclear safeguards and environmental impact assessment. The projects emphasis, however, is on monitoring conducted to verify expected repository system evolutions - i.e. evolutions of the natural environment and the engineered system - during a phase of progressive construction, operation and closure that may last on the order of a century. This serves the purpose of confirming and possibly enhancing the prior license basis for safety and pre-closure management options. Achieving this goal includes analysis of whether the implementation of a realistic monitoring programme is likely to address expert and lay stakeholder expectations (objectives), to provide an understanding of monitoring activities and available technologies that can be implemented in a repository context (feasibility), and to provide recommendations for related, future stakeholder engagement activities (social acceptance). These are carried out by the 18 project partners representing 12

  11. Bangladesh Agro-Climatic Environmental Monitoring Project

    Science.gov (United States)

    Vermillion, C.; Maurer, H.; Williams, M.; Kamowski, J.; Moore, T.; Maksimovich, W.; Obler, H.; Gilbert, E.

    1988-01-01

    The Agro-Climatic Environmental Monitoring Project (ACEMP) is based on a Participating Agency Service Agreement (PASA) between the Agency for International Development (AID) and the National Oceanic and Atmospheric Administration (NOAA). In FY80, the Asia Bureau and Office of Federal Disaster Assistance (OFDA), worked closely to develop a funding mechanism which would meet Bangladesh's needs both for flood and cyclone warning capability and for application of remote sensing data to development problems. In FY90, OFDA provided for a High Resolution Picture Transmission (HRPT) receiving capability to improve their forecasting accuracy for cyclones, flooding and storm surges. That equipment is primarily intended as a disaster prediction and preparedness measure. The ACEM Project was designed to focus on the development applications of remote sensing technology. Through this Project, AID provided to the Bangladesh Government (BDG) the equipment, technical assistance, and training necessary to collect and employ remote sensing data made available by satellites as well as hydrological data obtained from data collection platforms placed in major rivers. The data collected will enable the BDG to improve the management of its natural resources.

  12. Quality assurance project plan for ground water monitoring activities managed by Westinghouse Hanford Company. Revision 3

    International Nuclear Information System (INIS)

    Stauffer, M.

    1995-11-01

    This quality assurance project plan (QAPP) applies specifically to the field activities and laboratory analysis performed for all RCRA groundwater projects conducted by Hanford Technical Services. This QAPP is generic in approach and shall be implemented in conjunction with the specific requirements of individual groundwater monitoring plans

  13. Technical Specifications of Structural Health Monitoring for Highway Bridges: New Chinese Structural Health Monitoring Code

    Directory of Open Access Journals (Sweden)

    Fernando Moreu

    2018-03-01

    Full Text Available Governments and professional groups related to civil engineering write and publish standards and codes to protect the safety of critical infrastructure. In recent decades, countries have developed codes and standards for structural health monitoring (SHM. During this same period, rapid growth in the Chinese economy has led to massive development of civil engineering infrastructure design and construction projects. In 2016, the Ministry of Transportation of the People’s Republic of China published a new design code for SHM systems for large highway bridges. This document is the first technical SHM code by a national government that enforces sensor installation on highway bridges. This paper summarizes the existing international technical SHM codes for various countries and compares them with the new SHM code required by the Chinese Ministry of Transportation. This paper outlines the contents of the new Chinese SHM code and explains its relevance for the safety and management of large bridges in China, introducing key definitions of the Chinese–United States SHM vocabulary and their technical significance. Finally, this paper discusses the implications for the design and implementation of a future SHM codes, with suggestions for similar efforts in United States and other countries.

  14. Process monitoring using a Quality and Technical Surveillance Program

    International Nuclear Information System (INIS)

    Rafferty, C.A.

    1995-01-01

    The purpose of process monitoring using a Quality and Technical Surveillance Program was to help ensure manufactured clad vents sets fully met technical and quality requirements established by the manufacturer and the customer, and that line and program management were immediately alerted if any aspect of the manufacturing activities drifted out of acceptable limits. The Quality and Technical Surveillance Program provided a planned, scheduled approach to monitor key processes and documentation illuminated potential problem areas early enough to permit timely corrective actions to reverse negative trends that, if left uncorrected, could have resulted in deficient hardware. Significant schedule and cost impacts were eliminated

  15. Waste management project technical baseline description

    International Nuclear Information System (INIS)

    Sederburg, J.P.

    1997-01-01

    A systems engineering approach has been taken to describe the technical baseline under which the Waste Management Project is currently operating. The document contains a mission analysis, function analysis, requirement analysis, interface definitions, alternative analysis, system definition, documentation requirements, implementation definitions, and discussion of uncertainties facing the Project

  16. Forest health monitoring: 2008 national technical report

    Science.gov (United States)

    Kevin M. Potter; Barbara L. Conkling

    2012-01-01

    The Forest Health Monitoring (FHM) Program’s annual national technical report has three objectives: (1) to present forest health status and trends from a national or a multi-State regional perspective using a variety of sources, (2) to introduce new techniques for analyzing forest health data, and (3) to report results of recently completed evaluation monitoring...

  17. Handbook to guide the measurement and monitoring of project effectiveness and impact

    Energy Technology Data Exchange (ETDEWEB)

    1986-09-15

    This handbook demonstrates the application of a tool for measuring and monitoring the impact of a development project in the Department of Quezaltenango, Guatemala. That project itself presently is a demonstration. It explores the technical feasibility and the commercial possibilities of direct geothermal heat applications to the processing of agricultural produce - with the eventual purpose of expanding agricultural exports from Guatemala. The handbook focuses on an early stage of the geothermal initiative and guides preparations for future impact measurement and monitoring of geothermal projects. Primarily, guidance is for projects in agricultural applications of geothermal heat - and basically in Quezaltenango. But the exercise and the handbook are relevant in broad outline to other, industrial applications projects as well which may be based in other departments and have immediate impact across the whole country. This handbook attempts to prepare geothermal energy planners in Guatemala for that juncture when geothermal projects can be managed by objectives. It promotes and facilitates thinking about defining specific objectives for projects that result from the demonstration at Zunil (in Quezaltenango Department); and it prompts preparations for obtaining baseline measurements and for making rational projections on the achievements of future projects.

  18. Technical basis and evaluation criteria for an air sampling/monitoring program

    International Nuclear Information System (INIS)

    Gregory, D.C.; Bryan, W.L.; Falter, K.G.

    1993-01-01

    Air sampling and monitoring programs at DOE facilities need to be reviewed in light of revised requirements and guidance found in, for example, DOE Order 5480.6 (RadCon Manual). Accordingly, the Oak Ridge National Laboratory (ORNL) air monitoring program is being revised and placed on a sound technical basis. A draft technical basis document has been written to establish placement criteria for instruments and to guide the ''retrospective sampling or real-time monitoring'' decision. Facility evaluations are being used to document air sampling/monitoring needs, and instruments are being evaluated in light of these needs. The steps used to develop this program and the technical basis for instrument placement are described

  19. VIRTUAL PHILOSOPHER PROJECT: PHILOSOPHICAL, PEDAGOGICAL AND TECHNICAL ASPECTS

    Directory of Open Access Journals (Sweden)

    E. V. Kuchinov

    2017-01-01

    Full Text Available The article describes philosophical and pedagogical aspects of an idea of the ‘virtual philosopher’ project developed at creative sessions at Minin University and technically concretized during interaction with the Laboratory of Mobile Services. ‘Virtual philosopher’ is thought to deliver creative automation of routine operations; producing contingent matter for philosophical processing as well as elements of the philosophical artificial intelligence and forms of ‘artificial life’. Project implementation may lead to the creation of an unparalleled educational technology that functions on the principles of flexibility, nonlinearity, affective inclusion and gamification of the educational process. Based on specific character of problems raised, rhizomatic analysis of the philosophical communities’ requests, assessment of their technical feasibility and technical development, provisions are made on the feasibility, prospects and productivity of this project.

  20. Remote monitoring technical review for light water reactors (Phase 1)

    Energy Technology Data Exchange (ETDEWEB)

    Park, Seung Sik; Yoon, Wan Ki; Na, Won Woo; Kwack, Eun Ho [Korea Atomic Energy Research Institute, Taejon (Korea)

    1999-10-01

    The IAEA has been conducting a field trial of a Remote Monitoring System (RMS) at the spent fuel storage, Younggwang 3 nuclear power plant. The system installation plan was initiated after the agreement in the 7th ROK-IAEA safeguards Implementation Review Meeting that was held in Soul, 1998. It describes that IAEA and Korea proceed RM tasks Implementation of RMS at LWRs in the ROK for field trials. The project of RMS is conducting through 3 stages with timing. RMS has been installed for the Phase I of field trial, one of two stages at Younggwang Unit 3 in October 1998. The RMS consists of video systems and a seal at the spent fuel pond area. This report provides a description of the monitoring system and its functions focusing on several technical points of the installation and its 6 month operation at Younggwang Unit 3. Subjects are selected and analyzed in the three chapters, IAEA safeguards policy on Remote Monitoring, the technology, and field test experiences. 8 refs., 12 figs., 12 tabs. (Author)

  1. TCR remote monitoring for the LHC technical infrastructure

    CERN Document Server

    Blanc, D; Morodo-Testa, M C; Poulsen, S; CERN. Geneva. ST Division

    2003-01-01

    The remote monitoring of the LHC technical infrastructure will mainly be done in CERN’s Technical Control Room (TCR). The technical infrastrucure consists of specialised equipment from different groups and divisions, mainly cooling and ventilation and electrical equipment. The responsibility for the definition, operation and maintenance of the equipment is covered by the relevant equipment group. However the monitoring and alerting for action in case of equipment failure is initiated by the TCR and is based on alarms that are sent by the equipment. This implies the correct integration of the equipment and the establishment of rules to follow during the commissioning and start-up of the equipment in order to ensure proper operation. This paper shows the integration possibilities and the different tasks and steps to follow by the different parties for smooth equipment integration and avoiding organizational problems.

  2. Technical Work Plan For: Meteorological Monitoring and Data Analysis

    International Nuclear Information System (INIS)

    C.T. Bastian

    2003-01-01

    The meteorological monitoring and analysis program has three overall objectives. First, the program will acquire qualified meteorological data from monitoring activities in the Environmental Safety and Health (ES and H) network, including appropriate controls on measuring and test equipment. All work will be completed in accordance with U.S. Department of Energy (DOE) Office of Repository Development (ORD) administrative procedures and Bechtel SAIC Co., LLC (BSC) line procedures. The continuously operating monitoring program includes measuring and test equipment calibrations, operational checks, preventive and corrective maintenance, and data collection. Second, the program will process the raw monitoring data collected in the field and submit technically reviewed, traceable data to the Technical Data Management System (TDMS) and the Records Processing Center. Third, reports containing analyses or calculations could be created to provide information to data requesters

  3. Yakima/Klickitat Fisheries Project; Klickitat Only Monitoring and Evaluation, 2002-2003 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Sampson, Melvin; Evenson, Rolf

    2003-12-01

    The monitoring and evaluation activities described in this report were determined by consensus of the scientists from the Yakama Nation (YN). Klickitat Subbasin Monitoring and Evaluation (M&E) activities have been subjected to scientific and technical review by members of YKFP's Science/Technical Advisory Committee (STAC) as part of the YKFP's overall M&E proposal. Yakama Nation YKFP project biologists have transformed the conceptual design into the tasks described. This report summarizes progress and results for the following major categories of YN-managed tasks under this contract: (1) Monitoring and Evaluation - Accurately characterize baseline available habitat and salmonid populations pre-habitat restoration and pre-supplementation. (2) EDT Modeling - Identify and evaluate habitat and artificial production enhancement options. (3) Genetics - Characterize the genetic profile of wild steelhead in the Klickitat Basin. (4) Ecological Interactions - Determine the presence of pathogens in wild and naturally produced salmonids in the Klickitat Basin and develop supplementation strategies using this information.

  4. Technical diagnostics - equipment monitoring for increasing safety and availability of nuclear power plants

    International Nuclear Information System (INIS)

    Sturm, A.; Foerster, R.

    1977-01-01

    Utilization of technical diagnostics in equipment monitoring of nuclear power plants for ensuring nuclear safety, economic availability, and for decision making on necessary maintenance is reviewed. Technical diagnostics is subdivided into inspection and early detection of malfunctions. Moreover, combination of technical diagnostics and equipment monitoring, integration of technical diagnostics into maintenance strategy, and problems of introducing early detection of malfunctions into maintenance management of nuclear power plants are also discussed. In addition, a compilation of measuring techniques used in technical diagnostics has been made. The international state of the art of equipment monitoring in PWR nuclear power plants is illustrated by description of the sound and vibration measuring techniques. (author)

  5. Process monitoring using a quality and technical surveillance program

    International Nuclear Information System (INIS)

    Rafferty, C.A.

    1995-01-01

    The purpose of process monitoring using a quality and technical surveillance program was to help ensure that manufactured clad went sets fully met technical and quality requirements established by the manufacturer and the customer and that line and program management were immediately alerted if any aspect of the manufacturing activities drifted out of acceptable limits. The quality and technical surveillance program provided a planned, scheduled approach to monitor key processes and documentation and certification systems to prevent noncompliances or any manufacturing discrepancies. These surveillances illuminated potential problem areas early enough to permit timely corrective actions to reverse negative trends that, if left uncorrected, could have resulted in deficient hardware. Significant schedule and cost impacts were eliminated. copyright 1995 American Institute of Physics

  6. Monitored Geologic Repository Project Description Document

    International Nuclear Information System (INIS)

    Curry, P.

    2000-01-01

    The primary objective of the Monitored Geologic Repository Project Description Document (PDD) is to allocate the functions, requirements, and assumptions to the systems at Level 5 of the Civilian Radioactive Waste Management System (CRWMS) architecture identified in Section 4. It provides traceability of the requirements to those contained in Section 3 of the ''Monitored Geologic Repository Requirements Document'' (MGR RD) (CRWMS M and O 2000b) and other higher-level requirements documents. In addition, the PDD allocates design related assumptions to work products of non-design organizations. The document provides Monitored Geologic Repository (MGR) engineering design basis in support of design and performance assessment in preparing for the Site Recommendation (SR) and License Application (LA) milestones. The engineering design basis documented in the PDD is to be captured in the System Description Documents (SDDs) which address each of the systems at Level 5 of the CRWMS architecture. The design engineers obtain the engineering design basis from the SDDs and by reference from the SDDs to the PDD. The design organizations and other organizations will obtain design related assumptions directly from the PDD. These organizations may establish additional assumptions for their individual activities, but such assumptions are not to conflict with the assumptions in the PDD. The PDD will serve as the primary link between the engineering design basis captured in the SDDs and the design requirements captured in U.S. Department of Energy (DOE) documents. The approved PDD is placed under Level 3 baseline control by the CRWMS Management and Operating Contractor (M and O) and the following portions of the PDD constitute the Technical Design Baseline for the MGR: the design characteristics listed in Table 2-1, the MGR Architecture (Section 4.1),the Engineering Design Bases (Section 5), and the Controlled Project Assumptions (Section 6)

  7. Data monitoring system of technical diagnosis system for EAST

    International Nuclear Information System (INIS)

    Qian Jing; Weng Peide; Chen Zhuomin; Wu Yu; Xi Weibin; Luo Jiarong

    2010-01-01

    Technical diagnosis system (TDS) is an important subsystem to monitor status parameters of EAST (experimental advanced superconducting tokamak). The upgraded TDS data monitoring system is comprised of management floor, monitoring floor and field floor.. Security protection, malfunction record and analysis are designed to make the system stable, robust and friendly. During the past EAST campaigns, the data monitoring system has been operated reliably and stably. The signal conditioning system and software architecture are described. (authors)

  8. Technical clarity in inter-agency negotiations: Lessons from four hydropower projects

    Science.gov (United States)

    Burkardt, Nina; Lamb, Berton Lee; Taylor, Jonathan G.; Waddle, Terry J.

    1995-01-01

    We investigated the effect of technical clarity on success in multi-party negotiations in the Federal Energy Regulatory Commission (FERC) licensing process. Technical clarity is the shared understanding of dimensions such as the geographic extent of the project, range of flows to be considered, important species and life stages, and variety of water uses considered. The results of four hydropower licensing consultations are reported. Key participants were interviewed to ascertain the level of technical clarity present during the consultations and the degree to which the consultations were successful. Technical clarity appears to be a prerequisite for successful outcomes. Factors that enhance technical clarity include simple project design, new rather than existing projects, precise definition of issues, a sense of urgency to reach agreement, a sense of fairness among participants, and consistency in participation. Negotiators should not neglect the critical pre-negotiation steps of defining technical issues and determining appropriate studies, deciding how to interpret studies, and agreeing on responses to study results.

  9. HIE ISOLDE Alignment and monitoring system technical design and project status

    CERN Document Server

    Gayde, J C; Kautzmann, G; Leclercq, Y; Waniorek, S; Williams, L

    2012-01-01

    In the frame of the HIE ISOLDE project most of the existing ISOLDE REX line will be replaced by a superconducting linac in order to upgrade the energy and intensity of the REX ISOLDE facility at CERN. Beam-physics simulations show that the optimum linac working conditions are obtained when the main axes of the active components, RF cavities and solenoid placed inside the cryostats, are aligned and permanently monitored on the REX Nominal Beam Line (NBL) within a precision of 0.3 mm for the cavities and 0.15 mm for the solenoids at one sigma level along directions perpendicular to the beam axis. This paper presents the proposed adjustment and alignment system based on opto-electronic sensors, optics and precise mechanic elements which are used, for some of them, in various non-standard environmental conditions such as high vacuum, cryogenic temperatures.

  10. CERN LHC Technical Infrastructure Monitoring (TIM)

    CERN Document Server

    Epting, U; Martini, R; Sollander, P; Bartolomé, R; Vercoutter, B; Morodo-Testa, M C

    1999-01-01

    The CERN Large Hadron Collider (LHC) will start to deliver particles to its experiments in the year 2005. However, all the primary services such as electricity, cooling, ventilation, safety systems and others such as vacuum and cryogenics will be commissioned gradually between 2001 and 2005. This technical infrastructure will be controlled using industrial control systems, which have either already been purchased from specialized companies or are currently being put together for tender. This paper discusses the overall architecture and interfaces that will be used by the CERN Technical Control Room (TCR) to monitor the technical services at CERN and those of the LHC and its experiments. The issue of coherently integrating existing and future control systems over a period of five years with constantly evolving technology is addressed. The paper also summarizes the functionality of all the tools needed by the control room such as alarm reporting, data logging systems, man machine interfaces and the console mana...

  11. The Effect of Technical Assistance on Involvement and Use: The Case of a Research, Evaluation, and Technical Assistance Project

    Science.gov (United States)

    Roseland, Denise; Volkov, Boris B.; Callow-Heusser, Catherine

    2011-01-01

    In contrast to typical National Science Foundation program evaluations, the Utah State Math Science Partnership-Research, Evaluation and Technical Assistance Project (MSP-RETA) provided technical assistance (TA) in two forms: direct TA for up to 10 projects a year, and professional development sessions for a larger number of project staff. Not…

  12. Prospects of Appliance-Level Load Monitoring in Off-the-Shelf Energy Monitors: A Technical Review

    Directory of Open Access Journals (Sweden)

    Anwar Ul Haq

    2018-01-01

    Full Text Available The smart grid initiative has encouraged utility companies worldwide to roll-out new and smarter versions of energy meters. Before an extensive roll-out, which is both labor-intensive and incurs high capital costs, consumers need to be incentivised to reap the long-term benefits of such smart meters. Off-the-shelf energy monitors (e-monitors can provide consumers with an insight into such potential benefits. As e-monitors are owned by the consumer, the consumer has greater control over the data, which significantly reduces the privacy and data confidentiality concerns. Because only limited online technical information is available about e-monitors, we evaluate several existing e-monitors using an online technical survey directly from the vendors. Besides automated e-monitoring, the use of different off-the-shelf e-monitors can also help to demonstrate state-of-the-art techniques such as non-intrusive load monitoring (NILM, data analytics, and the predictive maintenance of appliances. Our survey indicates a trend towards the incorporation of such state-of-the-art capabilities, particularly the appliance-level e-monitoring and load disaggregation. We have also discussed some essential requirements to implement load disaggregation in the next generation e-monitors. In future, these intelligent e-monitoring techniques will encourage effective consumer participation in the demand-side management (DSM programs.

  13. Monitored Retrievable Storage (MRS) facility project status

    International Nuclear Information System (INIS)

    Milner, R.A.; Trebules, V.W.; Blandford, J.B.

    1994-01-01

    1993 has been yet another year of major change in the Monitored Retrievable Storage (MRS) project. The change in administration has brought a new Secretary of Energy to the Department. Secretary O'Leary has brought a strong leadership background and fresh ideas to address the Department's many complex challenges, including the Civilian Radioactive Waste Management System (CRWMS). Dr. Daniel Dreyfus was named Director of the Office of Civilian Radioactive Waste Management. Mr. Richard Stallings has been named, as the new, Nuclear Waste Negotiator under the Nuclear Waste Policy Act, Amendments of 1987. The overall mission of the Office of Civilian Radioactive Waste Management (OCRWM) has not changed. OCRWM is tasked with finding technically sound, environmentally responsible and economically viable solutions to spent nuclear fuel and high-level radioactive waste storage and disposal

  14. Technical management of difference in CEPR nuclear power project

    International Nuclear Information System (INIS)

    Guo Ruiting

    2014-01-01

    The Thesis dissertate the application of technical management of difference in CEPR Nuclear Power Project from EPR technical bases, condition of a nuclear power plant site, engineering and procurement, construction, quality management, schedule management and experience feedback aspects. (author)

  15. Should Project Managers Buy Technical Data

    Science.gov (United States)

    2017-04-06

    the future. The research also exposed perspective organizational viewpoints on what technical data rights are needed and what analysis is available...DAU professor Dr. John Larson. To conclude, this research project was completed with tremendous love and support from my family . Address any...Study ........................................................................................................... 2 Significance of This Research

  16. UMTRA project technical assistance contractor quality assurance implementation plan

    International Nuclear Information System (INIS)

    1994-03-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Technical Assistance contractor (TAC) Quality Assurance Implementation Plan (QAIP) outlines the primary requirements for integrating quality functions for TAC technical activities applied to the surface and ground water phases of the UMTRA Project. The QAIP is subordinate to the latest issue of the UMTRA Project TAC Quality Assurance Program Plan (QAPP) (DOE, 1993a), which was developed using US Department of Energy (DOE) Order 5700.6C quality assurance (QA) criteria. The QAIP addresses technical aspects of the TAC UMTRA Project surface and ground water programs. All QA issues in the QAIP shall comply with requirements contained in the TAC QAPP (DOE, 1933a). Because industry standards for data acquisition and data control are not addressed in DOE Order 5700.6C, the QAIP has been formatted to the 14 US Environmental Protection Agency (EPA) Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) QA requirements. DOE Order 5700.6C criteria that are not contained in the CERCLA requirements are added to the QAIP as additional requirements in Sections 15.0 through 18.0. Project documents that contain CERCLA requirements and 5700.6 criteria shall be referenced in this document to avoid duplication. Referenced documents are not included in this QAIP but are available through the UMTRA Project Document Control Center

  17. Forest health monitoring: 2005 national technical report

    Science.gov (United States)

    Mark J. Ambrose; Barbara L. Conkling

    2007-01-01

    The Forest Health Monitoring program's annual national technical report presents results of forest health analyses from a national perspective using data from a variety of sources. The report is organized according to the Criteria and Indicators for the Conservation and Sustainable Management of Temperate and Boreal Forests of the Santiago Declaration. The results...

  18. Forest health monitoring: 2006 national technical report

    Science.gov (United States)

    Mark J. Ambrose; Barbara L. Conkling

    2009-01-01

    The Forest Health Monitoring Program’s annual national technical report presents results of forest health analyses from a national perspective using data from a variety of sources. The report is organized according to the Criteria and Indicators for the Conservation and Sustainable Management of Temperate and Boreal Forests of the...

  19. Flammable gas tank safety program: Technical basis for gas analysis and monitoring

    International Nuclear Information System (INIS)

    Estey, S.D.

    1998-01-01

    Several Hanford waste tanks have been observed to exhibit periodic releases of significant quantities of flammable gases. Because potential safety issues have been identified with this type of waste behavior, applicable tanks were equipped with instrumentation offering the capability to continuously monitor gases released from them. This document was written to cover three primary areas: (1) describe the current technical basis for requiring flammable gas monitoring, (2) update the technical basis to include knowledge gained from monitoring the tanks over the last three years, (3) provide the criteria for removal of Standard Hydrogen Monitoring System(s) (SHMS) from a waste tank or termination of other flammable gas monitoring activities in the Hanford Tank farms

  20. Forest health monitoring: 2007 national technical report

    Science.gov (United States)

    Barbara L. Conkling

    2011-01-01

    The Forest Health Monitoring Program produces an annual technical report that has two main objectives. The first objective is to present information about forest health from a national perspective. The second objective is to present examples of useful techniques for analyzing forest health data new to the annual national reports and new applications of techniques...

  1. Forest health monitoring: 2009 national technical report

    Science.gov (United States)

    Kevin M. Potter; Barbara L. Conkling

    2012-01-01

    The annual national technical report of the Forest Health Monitoring Program of the Forest Service, U.S. Department of Agriculture, presents forest health status and trends from a national or multi-State regional perspective using a variety of sources, introduces new techniques for analyzing forest health data, and summarizes results of recently completed Evaluation...

  2. Monitoring parameters of technical condition and safety of aircraft using control charts

    Directory of Open Access Journals (Sweden)

    В.І. Чепіженко

    2007-03-01

    Full Text Available  The opportunity of control cards use for monitoring of a technical condition parameters and reliability of aviation techniques is considered at its operation on a technical condition.

  3. Basalt Waste Isolation Project Technical Program Evaluation Process: a criteria-based method

    International Nuclear Information System (INIS)

    Babad, H.; Evans, G.C.; Wolfe, B.A.

    1982-01-01

    The need to objectively evaluate the progress being made by the Basalt Waste Isolation Project (BWIP) toward establishing the feasibility of siting a nuclear waste repository in basalt (NWRB) mandates a process for evaluating the technical work of the project. To assist BWIP management in the evaluation process, the Systems Department staff has developed a BWIP Technical Program Evaluation Process (TPEP). The basic process relates progress on project technical work to the SWIP Functional and System Performance Criteria as defined in National Waste Terminal Storage (MWTS) Criteria Documents. The benefits of the TPEP to BWIP and future plans for TPEP are discussed. During fiscal year (FY) 1982, TPEP wll be further formalized and further applied to the review of BWIP technical activities

  4. Monitoring Completed Navigation Projects Program

    National Research Council Canada - National Science Library

    Bottin, Jr., Robert R

    2001-01-01

    ... (MCNP) Program. The program was formerly known as the Monitoring Completed Coastal Projects Program, but was modified in the late 1990s to include all navigation projects, inland as well as coastal...

  5. Uganda's National Transmission Backbone Infrastructure Project: Technical Challenges and the Way Forward

    Science.gov (United States)

    Bulega, T.; Kyeyune, A.; Onek, P.; Sseguya, R.; Mbabazi, D.; Katwiremu, E.

    2011-10-01

    Several publications have identified technical challenges facing Uganda's National Transmission Backbone Infrastructure project. This research addresses the technical limitations of the National Transmission Backbone Infrastructure project, evaluates the goals of the project, and compares the results against the technical capability of the backbone. The findings of the study indicate a bandwidth deficit, which will be addressed by using dense wave division multiplexing repeaters, leasing bandwidth from private companies. Microwave links for redundancy, a Network Operation Center for operation and maintenance, and deployment of wireless interoperability for microwave access as a last-mile solution are also suggested.

  6. Technical modifications and management innovations in exporting nuclear reactor projects

    International Nuclear Information System (INIS)

    Mao Xiaoming; Qin Xijiu; Ding Hu; Xue Zhaoqun; Wen Shengjun

    2009-01-01

    As a main channel for the foreign economic cooperation of China nuclear industry, China Zhongyuan Engineering Corporation (CZEC) has been constantly engaged in technical modifications and management innovations in its exporting nuclear reactor projects. In the implementation of heavy water research reactor contract in Algeria, CZEC had established a complete and adequate design standards system in compliance with the international standards, and made significant modifications to the reference reactor in the aspects of reactor power and reactor safety, solved quite some technical issues which-affected the reactor technical performance. The modifications and improvements enabled the technical parameters, safety features, reactor multipurpose application to attain to the advanced level in the world. In the 300 MWe PWR NPPs in Pakistan, safety features had been updated in line with upgrading regulatory requisites. The design philosophy and technology application demonstrated CZEC' s creation and innovation on basis of constant safety enhancement of nuclear power projects. Efforts had also been made by CZEC' s creation and innovation on basis of constant safety enhancement of nuclear power projects. Efforts had also been made by CZEC in promoting China made equipment items and components exportation. (authors)

  7. The arrangement of deformation monitoring project and analysis of monitoring data of a hydropower engineering safety monitoring system

    Science.gov (United States)

    Wang, Wanshun; Chen, Zhuo; Li, Xiuwen

    2018-03-01

    The safety monitoring is very important in the operation and management of water resources and hydropower projects. It is the important means to understand the dam running status, to ensure the dam safety, to safeguard people’s life and property security, and to make full use of engineering benefits. This paper introduces the arrangement of engineering safety monitoring system based on the example of a water resource control project. The monitoring results of each monitoring project are analyzed intensively to show the operating status of the monitoring system and to provide useful reference for similar projects.

  8. Monitoring in educational development projects : the development of a monitoring system

    NARCIS (Netherlands)

    Plomp, T.; Huijsman, Hari; Kluyfhout, Eric

    1992-01-01

    Monitoring in education is usually focused on the monitoring of educational systems at different levels. Monitoring of educational projects receives only recently explicit attention. The paper discusses first the concepts of educational monitoring and evaluation. After that, the experience with

  9. Promoting gender parity in basic education: Lessons from a technical cooperation project in Yemen

    Science.gov (United States)

    Yuki, Takako; Mizuno, Keiko; Ogawa, Keiichi; Mihoko, Sakai

    2013-06-01

    Many girls are not sent to school in Yemen, despite basic education being free as well as compulsory for all children aged 6-15. Aiming to improve girls' enrolment by increasing parental and community involvement, the Japan International Cooperation Agency (JICA) offered a technical cooperation project in June 2005 called Broadening Regional Initiative for Developing Girls' Education (BRIDGE). Phase 1 of this project ran for three and a half years, piloting a participatory school management model supported by school grants in six districts of the Taiz Governorate in the Southwest of Yemen. To find out how successful this approach has been in a traditional society, the authors of this paper analysed the gender parity index (GPI) of the project's pilot schools. Based on data collected at three points in time (in the initial and final years of the project, and two years after the project's end), their findings suggest that interventions in school management which strongly emphasise girls' education can be effective in improving gender parity rather quickly, regardless of the schools' initial conditions. However, the authors also observe that the pilot schools' post-project performance in terms of gender parity is mixed. While the local government allocated budgets for school grants to all pilot schools even after the project's end, training and monitoring activities were cut back. The authors further observe that the variation in performance appears to be significantly correlated with school leaders' initial perceptions of gender equality and with the number of female teachers employed. These findings point to the importance of providing schools with continuous long-term guidance and of monitoring those which implement school improvement programmes.

  10. Yucca Mountain Site Characterization Project Technical Data Catalog

    International Nuclear Information System (INIS)

    1992-01-01

    The June 1, 1985, Department of Energy (DOE)/Nuclear, Regulatory Commission (NRC) Site-Specific Procedural Agreement for Geologic Repository Site Investigation and Characterization Program requires the DOE to develop and maintain a catalog of data which will be updated and provided to the NRC at least quarterly. This catalog is to include a description of the data; the time (date), place, and method of acquisition; and where it may be examined. The Yucca Mountain Site Characterization Project (YMP) Technical Data Catalog is published and distributed in accordance with the requirements of the Site-Specific Agreement. The YMP Technical Data Catalog is a report based on reference information contained in the YMP Automated Technical Data Tracking System (ATDT). The reference information is provided by Participants for data acquired or developed in support of the YMP. The Technical Data Catalog is updated quarterly and published in the month following the end of each quarter. Each new publication of the Technical Data Catalog supersedes the previous edition

  11. Yucca Mountain Site Characterization Project technical data catalog

    International Nuclear Information System (INIS)

    1992-01-01

    The June 1, 1985, Department of Energy (DOE)/Nuclear Regulatory Commission (NRC) Site-Specific Procedural Agreement for Geologic Repository Site Investigation and Characterization Program requires the DOE to develop and maintain a catalog of data which will be updated and provided to the NRC at least quarterly. This catalog is to include a description of the data; the time (date), place, and method of acquisition; and where it may be examined. The Yucca Mountain Site Characterization Project (YMP) Technical Data Catalog is published and distributed in accordance with the requirements of the Site-Specific Agreement. The YMP Technical Data Catalog is a report based on reference information contained in the YMP Automated Technical Data Tracking System (ATDT). The reference information is provided by Participants for data acquired or developed in support of the YMP. The Technical Data Catalog is updated quarterly and published in the month following the end of each quarter. Each new publication of the Technical Data Catalog supersedes the previous edition

  12. Technical Basis Document for PFP Area Monitoring Dosimetry Program

    CERN Document Server

    Cooper, J R

    2000-01-01

    This document describes the phantom dosimetry used for the PFP Area Monitoring program and establishes the basis for the Plutonium Finishing Plant's (PFP) area monitoring dosimetry program in accordance with the following requirements: Title 10, Code of Federal Regulations (CFR), part 835, ''Occupational Radiation Protection'' Part 835.403; Hanford Site Radiological Control Manual (HSRCM-1), Part 514; HNF-PRO-382, Area Dosimetry Program; and PNL-MA-842, Hanford External Dosimetry Technical Basis Manual.

  13. Technical Basis Document for PFP Area Monitoring Dosimetry Program

    International Nuclear Information System (INIS)

    COOPER, J.R.

    2000-01-01

    This document describes the phantom dosimetry used for the PFP Area Monitoring program and establishes the basis for the Plutonium Finishing Plant's (PFP) area monitoring dosimetry program in accordance with the following requirements: Title 10, Code of Federal Regulations (CFR), part 835, ''Occupational Radiation Protection'' Part 835.403; Hanford Site Radiological Control Manual (HSRCM-1), Part 514; HNF-PRO-382, Area Dosimetry Program; and PNL-MA-842, Hanford External Dosimetry Technical Basis Manual

  14. 75 FR 8036 - Monitor-Hot Creek Rangeland Project

    Science.gov (United States)

    2010-02-23

    ... DEPARTMENT OF AGRICULTURE Forest Service Monitor-Hot Creek Rangeland Project AGENCY: Forest... Rangeland Project area. The analysis will determine if a change in management direction for livestock grazing is needed to move existing resource conditions within the Monitor-Hot Creek Rangeland Project area...

  15. Integrated Monitoring Plan for the Hanford Groundwater Monitoring Project

    International Nuclear Information System (INIS)

    Newcomer, D.R.; Thornton, E.C.; Hartman, M.J.; Dresel, P.E.

    1999-01-01

    Groundwater is monitored at the Hanford Site to fulfill a variety of state and federal regulations, including the Atomic Energy Act of 1954 the Resource Conservation and Recovery Act of 1976 the Comprehensive Environmental Response, Compensation, and Liability Act of 1980; and Washington Administrative Code. Separate monitoring plans are prepared for various requirements, but sampling is coordinated and data are shared among users to avoid duplication of effort. The US Department of Energy manages these activities through the Hanford Groundwater Monitoring Project. This document is an integrated monitoring plan for the groundwater project. It documents well and constituent lists for monitoring required by the Atomic Energy Act of 1954 and its implementing orders; includes other, established monitoring plans by reference; and appends a master well/constituent/frequency matrix for the entire site. The objectives of monitoring fall into three general categories plume and trend tracking, treatment/storage/disposal unit monitoring, and remediation performance monitoring. Criteria for selecting Atomic Energy Act of 1954 monitoring networks include locations of wells in relation to known plumes or contaminant sources, well depth and construction, historical data, proximity to the Columbia River, water supplies, or other areas of special interest, and well use for other programs. Constituent lists were chosen based on known plumes and waste histories, historical groundwater data, and, in some cases, statistical modeling. Sampling frequencies were based on regulatory requirements, variability of historical data, and proximity to key areas. For sitewide plumes, most wells are sampled every 3 years. Wells monitoring specific waste sites or in areas of high variability will be sampled more frequently

  16. The Basalt Waste Isolation Project technical program evaluation process: A criteria-based method

    International Nuclear Information System (INIS)

    Babad, H.; Evans, C.; Wolfe, B.A.

    1982-01-01

    The need to objectively evaluate the progress being made by the Basalt Waste Isolation Project (BWIP) toward establishing the feasibility of siting a nuclear waste repository in basalt (NWRB) mandates a process for evaluating the technical work of the project. To assist BWIP management in the evaluation process, the Systems Department staff has developed a BWIP Technical Program Evaluation Process (TPEP). The basic process relates progress on project technical work to the BWIP Functional and System Performance Criteria as defined in National Waste Terminal Storage (NWTS) Criteria Documents. The benefits of the TPEP to BWIP and future plans for TPEP are discussed. During fiscal year (FY) 1982, TPEP will be further formalized and further applied to the review of BWIP technical activities

  17. Technical Basis Document for PFP Area Monitoring Dosimetry Program

    Energy Technology Data Exchange (ETDEWEB)

    COOPER, J.R.

    2000-04-17

    This document describes the phantom dosimetry used for the PFP Area Monitoring program and establishes the basis for the Plutonium Finishing Plant's (PFP) area monitoring dosimetry program in accordance with the following requirements: Title 10, Code of Federal Regulations (CFR), part 835, ''Occupational Radiation Protection'' Part 835.403; Hanford Site Radiological Control Manual (HSRCM-1), Part 514; HNF-PRO-382, Area Dosimetry Program; and PNL-MA-842, Hanford External Dosimetry Technical Basis Manual.

  18. The international remote monitoring project and implication

    International Nuclear Information System (INIS)

    Sonnier, C.S.; Johnson, C.S.

    1994-01-01

    The future of remote monitoring in International Safeguards system is analyzed. Problems of an update on the International Remote Monitoring Project are considered. The Project allows to remotely transmit safeguards-relevant data directly to IAEA from nuclear facilities worldwide. Description of integrated monitoring system (IMS) is given. A key element of state-of-art of IMS is modular nodal system which accepts information from sensors and provides information to both a data storage unit and a transmitter. Remote Monitoring Systems of Australia and Sweden are presented. 3 figs

  19. Plutonium immobilization project development and testing technical project office quality assurance program description

    International Nuclear Information System (INIS)

    Gould, T.H.; MacLean, L.M.; Ziemba, J.M.

    1999-01-01

    The Plutonium Immobilization Project (PIP) is one of several fissile materials disposition projects managed by the Department of Energy (DOE) Office of Fissile Materials Disposition (OFMD). The PIP is expected to evolve from the current Development and Testing (D and T) effort, to design, to construction, and finally to operations. Overall management and technical management of the D and T effort resides at the Lead Laboratory, Lawrence Livermore National Laboratory (LLNL), through the LLNL Manager, Fissile Materials Disposition Program (FMDP). Day to day project activities are managed by the D and T Technical Project Office (TPO), which reports to the LLNL Manager, FMDP. The D and T TPO consists of the Technical Manager, the TPO Quality Assurance (QA) Program Manager, and TPO Planning and Support Staff. This Quality Assurance Program Description (QAPD) defines the QA policies and controls that will be implemented by these TPO personnel in their management of D and T activities. This QAPD is consistent with and responsive to the Department of Energy Fissile Materials Disposition Program Quality Assurance Requirements Document (FMDP QARD). As the Project and upper level requirement's documents evolve, this QAPD will be updated as necessary to accurately define and describe the QA Program and Management of the PIP. The TPO has a policy that all development and testing activities be planned, performed and assessed in accordance with its customer's requirements, needs and expectations, and with a commitment to excellence and continuous improvement. The TPO QAPD describes implementation requirements which, when completed, will ensure that the project development and testing activities conform to the appropriate QA requirements. For the program to be effective, the TPO QA Program Manager will ensure that each site participating in D and T activities has developed a QAPD, which meets the customer's requirements, and has a designated quality leader in place. These customer

  20. Making the most of LCA in technical inter-organisational R&D projects

    DEFF Research Database (Denmark)

    Sandin, Gustav; Clancy, Gunilla; Heimersson, Sara

    2014-01-01

    In technical Research and Development (R&D) projects, a Life Cycle Assessment (LCA) of the technology under development is sometimes carried out. Particularly in inter-organisational R&D projects, the roles of LCAs tend to be unclear and arbitrary, and as a consequence, LCA work is not adequately...... designed for the needs of the project. There is a need for research on how to choose an appropriate role for LCA in such projects and how to plan LCA work accordingly. We have identified some possible roles of LCA in inter-organisational R&D projects and used experiences from LCA work in different...... such projects to identify four project characteristics that are decisive for what roles the LCA can have. The project characteristics are: (i) the project's potential influence on environmental impacts, (ii) the degrees of freedom available for the technical direction of the project, (iii) the project...

  1. Optimization of the choice of unmanned aerial vehicles used to monitor the implementation of selected construction projects

    Science.gov (United States)

    Skorupka, Dariusz; Duchaczek, Artur; Waniewska, Agnieszka; Kowacka, Magdalena

    2017-07-01

    Due to their properties unmanned aerial vehicles have huge number of possibilities for application in construction engineering. The nature and extent of construction works performedmakes the decision to purchase the right equipment significant for the possibility for its further use while monitoring the implementation of these works. Technical factors, such as the accuracy and quality of the applied measurement instruments are especially important when monitoring the realization of construction projects. The paper presents the optimization of the choice of unmanned aerial vehicles using the Bellinger method. The decision-making analysis takes into account criteria that are particularly crucial by virtue of the range of monitoring of ongoing construction works.

  2. Measurement of software project management effectiveness

    OpenAIRE

    Demir, Kadir Alpaslan

    2008-01-01

    Approved for public release; distribution is unlimited. Evaluating, monitoring, and improving the effectiveness of project management can contribute to successful acquisition of software systems. In this dissertation, we introduce a quantitative metric for gauging the effectiveness of managing a software-development project. The metric may be used to evaluate and monitor project management effectiveness in software projects by project managers, technical managers, executive man...

  3. Project monitoring package (PMP) : A package for project activity monitoring

    International Nuclear Information System (INIS)

    Vyas, K.N.; Kannan, A.; Susandhi, R.; Basu, S.

    1987-01-01

    A package for preparing PERT/CPM network diagrams has been written for PDP-11/34. The program uses PLOT-10 library calls for device interfacing. The package is essentially non-interactive in nature, and reads input data in the form of activity description and duration. It calculates the critical path time and performs time scaling of the events. The report gives a brief outline of the logic used, a sample plot and tabular output for reference. An additional facility for performing project activity monitoring has also been implemented. Activity monitoring generally requires various reports such as feed back reports from various group co-ordinators, information report for project co-ordinator and brief periodical reports for management. A package 'DATATRIEVE' (DTR) on PDP-11/34 system is utilized for generating the above mentioned reports. As DTR can also use normal sequential files, an interfacing program has been written which reformats the files accepted by PERT program acceptable to DTR. Various types of reports as generated by DTR are included. However this part of the package is not transportable and can be implemented only on systems having DTR. 6 figures. (author)

  4. Integrated Monitoring Plan for the Hanford Groundwater Monitoring Project

    International Nuclear Information System (INIS)

    Hartman, Mary J.; Dresel, P. Evan; Lindberg, Jon W.; Newcomer, Darrell R.; Thornton, Edward C.

    2000-01-01

    Groundwater is monitored at the Hanford Site to fulfill a variety of state and federal regulations, including the Atomic Energy Act of 1954; the Resource Conservation and Recovery Act of 1976; the Comprehensive Environmental Response, Compensation, and Liability Act of 1980; and Washington Administrative Code. Separate monitoring plans are prepared for various requirements, but sampling is coordinated and data are shared among users to avoid duplication of effort. The U.S. Department of Energy manages these activities through the Hanford Groundwater Monitoring Project. This document is an integrated monitoring plan for the groundwater project. It documents well and constituent lists for monitoring required by the Atomic Energy Act of 1954 and its implementing orders; includes other, established monitoring plans by reference; and appends a master well/constituent/ frequency matrix for the entire site. The objectives of monitoring fall into three general categories: plume and trend tracking, treatment/ storage/disposal unit monitoring, and remediation performance monitoring. Criteria for selecting Atomic Energy Act of 1954 monitoring networks include locations of wells in relation to known plumes or contaminant sources, well depth and construction, historical data, proximity to the Columbia River, water supplies, or other areas of special interest, and well use for other programs. Constituent lists were chosen based on known plumes and waste histories, historical groundwater data, and, in some cases, statistical modeling. Sampling frequencies were based on regulatory requirements, variability of historical data, and proximity to key areas. For sitewide plumes, most wells are sampled every 3 years. Wells monitoring specific waste sites or in areas of high variability will be sampled more frequently

  5. Technical assistance for Meharry Medical College Energy Efficiency Project. Final project status and technical report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-05-08

    This report presents the results of a program to provide technical assistance to Meharry Medical College. The purpose of the program is to facilitate Meharry`s effort to finance a campus-wide facility retrofit. The US Department of Energy (USDOE) funded the program through a grant to the Tennessee Department of Economic and Community Development (TECD). The University of Memphis-Technology and Energy Services (UM-TES), under contract to TECD, performed program services. The report has three sections: (1) introduction; (2) project definition, financing, and participants; and (3) opportunities for federal participation.

  6. Integrating public information activities on a technical project

    International Nuclear Information System (INIS)

    Little, Sh. K.; Vecchiola, S.F.

    1984-01-01

    Through gradual evolution and successful performance, the WIPP Communications group has gained respect and recognition as a dual service organization that offers numerous benefits to a technical project. Westinghouse assembled a team that has successfully coordinated and encouraged an exchange of information not only with the public information realm but also as a project service and function. WIPP has combined educational services, external and employee communication and public information into one unit called ''Communications''

  7. MCO Monitoring issue closure package

    International Nuclear Information System (INIS)

    SEXTON, R.A.

    1998-01-01

    Agreement on a focused, limited approach to MCO monitoring has been documented. While the value of monitoring has been understood by those interested in the SNF Project, there had been a diversity of opinion on details of approach and implementation. For this reason, MCO monitoring had been identified as a technical issue. A cooperative effort involving the contractor, RL, and the technical assistance group (TAG), resulted in the definition of an approach agreeable to all and of the remaining details to be resolved through conceptual engineering. MCO monitoring will consist of temperature, pressure, and gas composition monitoring of 4 to 6 MCOs for up to two years. High pressure detection capability for the duration of interim storage for every MCO will also be evaluated and implemented within the current project baseline, if possible. Otherwise a BCR will be prepared and submitted

  8. Technical data base quarterly report, April--June 1992; Yucca Mountain Site Characterization Project

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1992-09-01

    The acquisition and development of technical data are activities that provide the information base from which the Yucca mountain Site will be characterized and may P-ventually be licensed as a high-level waste repository. The Project Technical Data Base (TDB) is the repository for the regional and site-specific technical data required in intermediate and license application analyses and models. The TDB Quarterly Report provides the mechanism for identifying technical data currently available from the Project TDB. Due to the variety of scientific information generated by YMP activities, the Project TDB consists of three components, each designed to store specific types of data. The Site and Engineering Properties Data Base (SEPDB) maintains technical data best stored in a tabular format. The Geographic Nodal Information Study and Evaluation System (GENISES), which is the Geographic Information System (GIS) component of the Project TDB, maintains spatial or map-like data. The Geologic and Engineering Materials Bibliography of Chemical Species (GEMBOCHS) data base maintains thermodynamic/geochemical data needed to support geochemical reaction models involving the waste package and repository geochemical environment. Each of these data bases are addressed independently within the TDB Quarterly Report.

  9. Research Projects, Technical Reports and Publications

    Science.gov (United States)

    Oliger, Joseph

    1996-01-01

    The Research Institute for Advanced Computer Science (RIACS) was established by the Universities Space Research Association (USRA) at the NASA Ames Research Center (ARC) on June 6, 1983. RIACS is privately operated by USRA, a consortium of universities with research programs in the aerospace sciences, under contract with NASA. The primary mission of RIACS is to provide research and expertise in computer science and scientific computing to support the scientific missions of NASA ARC. The research carried out at RIACS must change its emphasis from year to year in response to NASA ARC's changing needs and technological opportunities. A flexible scientific staff is provided through a university faculty visitor program, a post doctoral program, and a student visitor program. Not only does this provide appropriate expertise but it also introduces scientists outside of NASA to NASA problems. A small group of core RIACS staff provides continuity and interacts with an ARC technical monitor and scientific advisory group to determine the RIACS mission. RIACS activities are reviewed and monitored by a USRA advisory council and ARC technical monitor. Research at RIACS is currently being done in the following areas: Advanced Methods for Scientific Computing High Performance Networks During this report pefiod Professor Antony Jameson of Princeton University, Professor Wei-Pai Tang of the University of Waterloo, Professor Marsha Berger of New York University, Professor Tony Chan of UCLA, Associate Professor David Zingg of University of Toronto, Canada and Assistant Professor Andrew Sohn of New Jersey Institute of Technology have been visiting RIACS. January 1, 1996 through September 30, 1996 RIACS had three staff scientists, four visiting scientists, one post-doctoral scientist, three consultants, two research associates and one research assistant. RIACS held a joint workshop with Code 1 29-30 July 1996. The workshop was held to discuss needs and opportunities in basic research in

  10. Yakima fisheries project spring chinook supplementation monitoring plan

    International Nuclear Information System (INIS)

    Busack, C.; Pearsons, T.; Knudsen, C.; Phelps, S.; Watson, B.; Johnston, M.

    1997-08-01

    The Yakima Fisheries Project (YFP), a key element in the Northwest Power Planning Council's Fish and Wildlife Program, has been in planning for more than ten years. It was initially conceived as, and is still intended to be, a multipurpose project. Besides increasing fish production in the Yakima basin, it is also intended to yield information about supplementation that will be of value to the entire Columbia basin, and hopefully the entire region. Because of this expectation of increased knowledge resulting from the project, a large and comprehensive monitoring program has always been seen as an integral part of the project. Throughout 1996 the Monitoring Implementation and Planning Team (MIPT), an interdisciplinary group of biologists who have worked on the project for several years, worked to develop a comprehensive spring chinook monitoring plan for the project. The result is the present document

  11. Iowa Hill Pumped Storage Project Investigations - Final Technical Report

    Energy Technology Data Exchange (ETDEWEB)

    Hanson, David [Sacramento Municipal Unitlity District, Sacramento, CA (United States)

    2016-07-01

    This Final Technical Report is a summary of the activities and outcome of the Department of Energy (DOE) Assistance Agreement DE-EE0005414 with the Sacramento Municipal Utility District (SMUD). The Assistance Agreement was created in 2012 to support investigations into the Iowa Hill Pumped-storage Project (Project), a new development that would add an additional 400 MW of capacity to SMUD’s existing 688MW Upper American River Hydroelectric Project (UARP) in the Sierra Nevada mountains east of Sacramento, California.

  12. MODEL RANCANGAN SISTEM INFORMASI PROJECT MONITORING

    Directory of Open Access Journals (Sweden)

    Yanti Yanti

    2009-10-01

    Full Text Available Economic development makes the property industry growing very rapidly. The property development is supported by the development of contractor’s company that conducts property development. Inside the contracting company doing business can not perform their own procurement because of the many items that must be provided. For the purposes of the construction company entered into an agreement with the subcontractor as vendor conduct procurement in accordance with the needs of contracting companies. To simplify the procurement process, generally conducted by a process called a tender / auction. This is done by contracting companies to get quality and price in accordance with the desired budget. The company’s commitment subcontractors as the procurement of goods to be one key to successful contracting company doing business development process. Therefore, the subcontractor companies are required to have a good commitment. Therefore we need a project monitoring system that can monitor business processes running on those sub contractor company. The purpose of this research is to design a project monitoring information system in accordance with company requirements to operational activities more effective and efficient company.Keywords: project monitoring, design model, subcontractor

  13. KWL Lingen nuclear plant. Technical annual report 2016; KWL Kernkraftwerk Lingen. Technischer Jahresbericht 2016

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2017-07-01

    The technical annual report 2016 for KWL (Lingen nuclear plant) covers the following sections: dismantling project management and operation, monitoring and clearance; waste management, technical qualification, security and safety, central tasks; licensing and supervision procedures, operational data, radiation monitoring, radioactive materials, in-service inspections.

  14. International Socio-Technical Challenges for Geological Disposal (InSOTEC): Project Aims and Preliminary Results - 12236

    Energy Technology Data Exchange (ETDEWEB)

    Bergmans, Anne; Schroeder, Jantine [University of Antwerp, Faculty of Political and Social Sciences, 2000 Antwerp (Belgium); Simmons, Peter [University of East Anglia, School of Environmental Sciences, NR4 7TJ Norwich (United Kingdom); Barthe, Yannick; Meyer, Morgan [CNRS, Ecole des Mines, 75272 Paris (France); Sundqvist, Goeran [Universitetet i Oslo, Centre for Studies of Technology, Innovation and Culture, 0851 Oslo (Norway); Martell, Merixell [MERIENCE Strategic Thinking, 08734 Olerdola (Spain); Kallenbach-Herbert, Beate [Oeko Institut, 64295 Darmstadt (Germany)

    2012-07-01

    InSOTEC is a social sciences research project which aims to generate a better understanding of the complex interplay between the technical and the social in radioactive waste management and, in particular, in the design and implementation of geological disposal. It currently investigates and analyses the most striking socio-technical challenges to implementing geological disposal of radioactive waste in 14 national programs. A focus is put on situations and issues where the relationship between the technical and social components is still unstable, ambiguous and controversial, and where negotiations are taking place in terms of problem definitions and preferred solutions. Such negotiations can vary from relatively minor contestation, over mild commotion, to strong and open conflicts. Concrete examples of socio-technical challenges are: the question of siting, introducing the notion of reversibility / retrievability into the concept of geological disposal, or monitoring for confidence building. In a second stage the InSOTEC partners aim to develop a fine-grained understanding of how the technical and the social influence, shape, build upon each other in the case of radioactive waste management and the design and implementation of geological disposal. How are socio-technical combinations in this field translated and materialized into the solutions finally adopted? With what kinds of tools and instruments are they being integrated? Complementary to providing better theoretical insight into these socio-technical challenges/combinations, InSOTEC aims to provide concrete suggestions on how to address these within national and international contexts. To this end, InSOTEC will deliver insights into how mechanisms for interaction between the technical community and a broad range of socio-political actors could be developed. (authors)

  15. REDD+ readiness: early insights on monitoring, reporting and verification systems of project developers

    International Nuclear Information System (INIS)

    Joseph, Shijo; Sunderlin, William D; Verchot, Louis V; Herold, Martin

    2013-01-01

    A functional measuring, monitoring, reporting and verification (MRV) system is essential to assess the additionality and impact on forest carbon in REDD+ (reducing emissions from deforestation and degradation) projects. This study assesses the MRV capacity and readiness of project developers at 20 REDD+ projects in Brazil, Peru, Cameroon, Tanzania, Indonesia and Vietnam, using a questionnaire survey and field visits. Nineteen performance criteria with 76 indicators were formulated in three categories, and capacity was measured with respect to each category. Of the 20 projects, 11 were found to have very high or high overall MRV capacity and readiness. At the regional level, capacity and readiness tended to be highest in the projects in Brazil and Peru and somewhat lower in Cameroon, Tanzania, Indonesia and Vietnam. Although the MRV capacities of half the projects are high, there are capacity deficiencies in other projects that are a source of concern. These are not only due to limitations in technical expertise, but can also be attributed to the slowness of international REDD+ policy formulation and the unclear path of development of the forest carbon market. Based on the study results, priorities for MRV development and increased investment in readiness are proposed. (letter)

  16. PROBLEM-SOLVING METHODS OF PROJECT MANAGEMENT OF TECHNICAL DEVELOPMENT FOR AGRICULTURAL PRODUCERS

    Directory of Open Access Journals (Sweden)

    Александр Васильевич СИДОРЧУК

    2015-05-01

    Full Text Available There have been proposed projects of technical development for agricultural producers. The conclusions about system features research projects that underlie the problem-solving methods of project management, have been made. There have been proved these projects (systems that can be simulated with the help of the research and formalization of many events. These events are components of the seven main factors of the agricultural production. The conclusion about the using the research method of the probabilistic nature events in the field of the crops projects with the help of the statistical and imitational models, have been developed. There have been considered the relation between the forecasting of functional marks of the technological systems and the estimation of their cost. And there have been found the optimum correspondence between parameters of the technical supply and planned features of the crops projects.

  17. Hanford Environmental Dose Reconstruction Project

    International Nuclear Information System (INIS)

    Finch, S.M.; McMakin, A.H.

    1992-06-01

    The objective of the Hanford Environmental Dose Reconstruction Project is to estimate the radiation doses that individuals and populations could have received from nuclear operations at Hanford since 1944. The project is being managed and conducted by the Battelle Pacific Northwest Laboratories under contract with the Centers for Disease Control. The independent Technical Steering Panel (TSP) provides technical direction. The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed, from release to impact on humans (dose estimates): source terms; environmental transport; environmental monitoring data; demography, food consumption, and agriculture; environmental pathways and dose estimates

  18. Hanford Environmental Dose Reconstruction Project

    International Nuclear Information System (INIS)

    Cannon, S.D.; Finch, S.M.

    1992-10-01

    The objective of the Hanford Environmental Dose Reconstruction (HEDR) Project is to estimate the radiation doses that individuals and populations could have received from nuclear operations at Hanford since 1944. The independent Technical Steering Panel (TSP) provides technical direction. The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed from release to impact on humans (dose estimates):Source Terms, Environmental Transport, Environmental Monitoring Data, Demography, Food Consumption, and Agriculture, and Environmental Pathways and Dose Estimates

  19. Los Alamos National Laboratory Environmental Restoration Project quarterly technical report, April--June 1994

    Energy Technology Data Exchange (ETDEWEB)

    1994-08-18

    This quarterly report describes the technical status of activities in the Los Alamos National Laboratory Environmental Restoration (ER) Project. Each activity is identified by an activity data sheet number, a brief title describing the activity or the technical area where the activity is located, and the name of the project leader. The Hazardous and Solid Waste Amendments (HSWA) portion of the facility operating permit requires the submission of a technical progress report on a quarterly basis. This report, submitted to fulfill the permit`s requirement, summarizes the work performed and the results of sampling and analysis in the ER Project. Suspect waste found include: Radionuclides, high explosives, metals, solvents and organics. The data provided in this report have not been validated. These data are considered ``reviewed data.``

  20. The NIOSH Radiation Dose Reconstruction Project: managing technical challenges.

    Science.gov (United States)

    Moeller, Matthew P; Townsend, Ronald D; Dooley, David A

    2008-07-01

    Approximately two years after promulgation of the Energy Employees Occupational Illness Compensation Program Act, the National Institute for Occupational Safety and Health Office of Compensation and Analysis Support selected a contractor team to perform many aspects of the radiation dose reconstruction process. The project scope and schedule necessitated the development of an organization involving a comparatively large number of health physicists. From the initial stages, there were many technical and managerial challenges that required continuous planning, integration, and conflict resolution. This paper identifies those challenges and describes the resolutions and lessons learned. These insights are hopefully useful to managers of similar scientific projects, especially those requiring significant data, technical methods, and calculations. The most complex challenge has been to complete defensible, individualized dose reconstructions that support timely compensation decisions at an acceptable production level. Adherence to applying claimant-favorable and transparent science consistent with the requirements of the Act has been the key to establishing credibility, which is essential to this large and complex project involving tens of thousands of individual stakeholders. The initial challenges included garnering sufficient and capable scientific staff, developing an effective infrastructure, establishing necessary methods and procedures, and integrating activities to ensure consistent, quality products. The continuing challenges include maintaining the project focus on recommending a compensation determination (rather than generating an accurate dose reconstruction), managing the associated very large data and information management challenges, and ensuring quality control and assurance in the presence of an evolving infrastructure. The lessons learned concern project credibility, claimant favorability, project priorities, quality and consistency, and critical

  1. A monitored retrievable storage facility: Technical background information

    International Nuclear Information System (INIS)

    1991-07-01

    The US government is seeking a site for a monitored retrievable storage facility (MRS). Employing proven technologies used in this country and abroad, the MRS will be an integral part of the federal system for safe and permanent disposal of the nation's high-level radioactive wastes. The MRS will accept shipments of spent fuel from commercial nuclear power plants, temporarily store the spent fuel above ground, and stage shipments of it to a geologic repository for permanent disposal. The law authorizing the MRS provides an opportunity for a state or an Indian tribe to volunteer to host the MRS. The law establishes the Office of the Nuclear Waste Negotiator, who is to seek a state or an Indian tribe willing to host an MRS at a technically-qualified site on reasonable terms, and is to negotiate a proposed agreement specifying the terms and conditions under which the MRS would be developed and operated at that site. This agreement can ensure that the MRS is acceptable to -- and benefits -- the host community. The proposed agreement must be submitted to Congress and enacted into law to become effective. This technical background information presents an overview of various aspects of a monitored retrievable storage facility, including the process by which it will be developed

  2. THE RELATIONSHIP BETWEEN TECHNICAL AND SOCIAL NORMS IN ENVIRONMENTAL PROJECT

    OpenAIRE

    Jasminka Lažnjak

    1992-01-01

    In the article the relationship between system of technical and system of social norms in ecological project has been considered from constructivist standpoint in sociology of technology. For adequate solution of technological problem of enviromental pollution by hydrocarbons is necessary to define beside technical also system of social norms. Sociological analysis of accidents in transportation of hydrocarbons is suggested in purpose of clear definition of responsibilities of certain social ...

  3. Online Monitoring Technical Basis and Analysis Framework for Large Power Transformers; Interim Report for FY 2012

    Energy Technology Data Exchange (ETDEWEB)

    Nancy J. Lybeck; Vivek Agarwal; Binh T. Pham; Heather D. Medema; Kirk Fitzgerald

    2012-09-01

    The Light Water Reactor Sustainability program at Idaho National Laboratory (INL) is actively conducting research to develop and demonstrate online monitoring (OLM) capabilities for active components in existing Nuclear Power Plants. A pilot project is currently underway to apply OLM to Generator Step-Up Transformers (GSUs) and Emergency Diesel Generators (EDGs). INL and the Electric Power Research Institute (EPRI) are working jointly to implement the pilot project. The EPRI Fleet-Wide Prognostic and Health Management (FW-PHM) Software Suite will be used to implement monitoring in conjunction with utility partners: the Shearon Harris Nuclear Generating Station (owned by Duke Energy for GSUs, and Braidwood Generating Station (owned by Exelon Corporation) for EDGs. This report presents monitoring techniques, fault signatures, and diagnostic and prognostic models for GSUs. GSUs are main transformers that are directly connected to generators, stepping up the voltage from the generator output voltage to the highest transmission voltages for supplying electricity to the transmission grid. Technical experts from Shearon Harris are assisting INL and EPRI in identifying critical faults and defining fault signatures associated with each fault. The resulting diagnostic models will be implemented in the FW-PHM Software Suite and tested using data from Shearon-Harris. Parallel research on EDGs is being conducted, and will be reported in an interim report during the first quarter of fiscal year 2013.

  4. Continuation of superpave projects monitoring.

    Science.gov (United States)

    2011-07-01

    This study involved the continuous monitoring of material properties and field performance of twelve Superpave project sections in Florida for the establishment of reasonable and effective mixture design guidelines and criteria, the identification an...

  5. Technical advances in flow cytometry-based diagnosis and monitoring of paroxysmal nocturnal hemoglobinuria

    Science.gov (United States)

    Correia, Rodolfo Patussi; Bento, Laiz Cameirão; Bortolucci, Ana Carolina Apelle; Alexandre, Anderson Marega; Vaz, Andressa da Costa; Schimidell, Daniela; Pedro, Eduardo de Carvalho; Perin, Fabricio Simões; Nozawa, Sonia Tsukasa; Mendes, Cláudio Ernesto Albers; Barroso, Rodrigo de Souza; Bacal, Nydia Strachman

    2016-01-01

    ABSTRACT Objective: To discuss the implementation of technical advances in laboratory diagnosis and monitoring of paroxysmal nocturnal hemoglobinuria for validation of high-sensitivity flow cytometry protocols. Methods: A retrospective study based on analysis of laboratory data from 745 patient samples submitted to flow cytometry for diagnosis and/or monitoring of paroxysmal nocturnal hemoglobinuria. Results: Implementation of technical advances reduced test costs and improved flow cytometry resolution for paroxysmal nocturnal hemoglobinuria clone detection. Conclusion: High-sensitivity flow cytometry allowed more sensitive determination of paroxysmal nocturnal hemoglobinuria clone type and size, particularly in samples with small clones. PMID:27759825

  6. Subsurface Contaminant Focus Area: Monitored Natural Attenuation (MNA)--Programmatic, Technical, and Regulatory Issues

    Energy Technology Data Exchange (ETDEWEB)

    Krupka, Kenneth M.; Martin, Wayne J.

    2001-07-23

    Natural attenuation processes are commonly used for remediation of contaminated sites. A variety of natural processes occur without human intervention at all sites to varying rates and degrees of effectiveness to attenuate (decrease) the mass, toxicity, mobility, volume, or concentration of organic and inorganic contaminants in soil, groundwater, and surface water systems. The objective of this review is to identify potential technical investments to be incorporated in the Subsurface Contaminant Focus Area Strategic Plan for monitored natural attenuation. When implemented, the technical investments will help evaluate and implement monitored natural attenuation as a remediation option at DOE sites. The outcome of this review is a set of conclusions and general recommendations regarding research needs, programmatic guidance, and stakeholder issues pertaining to monitored natural attenuation for the DOE complex.

  7. Technical project for a new water purification solution

    Directory of Open Access Journals (Sweden)

    Toma Adina

    2018-01-01

    Full Text Available This research is part of the RO-BG Cross-Border Cooperation Program, project “CLEANDANUBE”, MIS-ETC 653, which has finalised by providing a common strategy to prevent the Danube’s pollution technological risks with oil and oil products. This paper presents a new sustainable water purification solution. A short introduction will be offered and an overview regarding the research and new methods to greening the waste is provided. The theoretical aspects of the centrifugal separation phenomenon are studied and the preliminary project bases were established. The paper conveys the possible constructive variations and the technological implications of those. Ultimately, the technical project for a new water purification solution and conclusions with critical points encountered during the designing phase are presented.

  8. A technical system to improve the operational monitoring of the Zaporozh'ye nuclear power plant

    International Nuclear Information System (INIS)

    Beyer, M.; Carl, H.; Schumann, P.; Seidel, A.; Weiss, F.-P.; Zschau, J.; Nowak, K.

    1997-01-01

    As part of a programme of cooperation with Central and Eastern European states, a technical system has been established for the Zaporozhe nuclear power plant, which complements existing operational checking and monitoring facilities with modern means of information technology. It makes it possible to continuously monitor the state of the units in normal operation and in cases of anomalies or incidents. The parameters selected for monitoring are listed, and the system of automatic evaluation at the power plant site is described in detail. Test operation of the technical system started in late 1995 and the industrial testing phase in mid-1996. (A.K.)

  9. Digital projection radiography. Technical principles, image properties and potential applications

    International Nuclear Information System (INIS)

    Busch, H.P.

    1999-01-01

    The history of development of digital projection radiography as a diagnostic method is presented in a comprehensive survey. The various technical principles are explained in detail and illustrated by means of graphic figures and digital X-ray pictures. A comparative assessment of currently applied radiographic systems is given and the potential clinical applications of the method of digital projection radiography are discussed. (orig./CB) [de

  10. Aerospace Systems Monitor, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — Proposal Title: Aerospace Systems Monitor PHASE 1 Technical Abstract: This Phase II STTR project will continue development and commercialization of the Aerospace...

  11. PNC/DOE Remote Monitoring Project at Japan's Joyo Facility

    International Nuclear Information System (INIS)

    Ross, M.; Hashimoto, Yu; Sonnier, C.; Dupree, S.; Ystesund, K.; Hale, W.

    1996-01-01

    The Power Reactor and Nuclear Fuel Development Corporation (PNC) of Japan and the US Department of Energy (DOE) are cooperating on the development of a remote monitoring system for nuclear nonproliferation efforts. This cooperation is part of a broader safeguards agreement between PNC and DOE. A remote monitoring system is being installed in a spent fuel storage area at PNC's experimental reactor facility Joyo in Oarai. The system has been designed by Sandia National Laboratories (SNL) and is closely related to those used in other SNL remote monitoring projects. The Joyo project will particularly study the unique aspects of remote monitoring in contribution to nuclear nonproliferation. The project will also test and evaluate the fundamental design and implementation of the remote monitoring system in its application to regional and international safeguards efficiency. This paper will present a short history of the cooperation, the details of the monitoring system and a general schedule of activities

  12. Applying EVM principles to Tevatron Beam Position Monitor Project

    International Nuclear Information System (INIS)

    Banerjee, Bakul

    2005-01-01

    At Fermi National Accelerator Laboratory (Fermilab), the Tevatron high energy particle collider must meet the increasing scientific demand of higher beam luminosity. To achieve this higher luminosity goal, U. S. Department of Energy (DOE) sponsored a major upgrade of capabilities of Fermilab's accelerator complex that spans five years and costs over fifty million dollars. Tevatron Beam Position Monitor (BPM) system upgrade is a part of this project, generally called RunII upgrade project. Since the purpose of the Tevatron collider is to detect the smashing of proton and anti-protons orbiting the circular accelerator in opposite directions, capability to detect positions of both protons and antiprotons at a high resolution level is a desirable functionality of the monitoring system. The original system was installed during early 1980s, along with the original construction of the Tevatron. However, electronic technology available in 1980s did not allow for the detection of significantly smaller resolution of antiprotons. The objective of the upgrade project is to replace the existing BPM system with a new system utilizing capabilities of modern electronics enhanced by a front-end software driven by a real-time operating software. The new BPM system is designed to detect both protons and antiprotons with increased resolution of up to an order of magnitude. The new system is capable of maintaining a very high-level of data integrity and system reliability. The system consists of 27 VME crates installed at 27 service buildings around the Tevatron ring servicing 236 beam position monitors placed underground, inside the accelerator tunnel. Each crate consists of a single Timing Generator Fanout module, custom made by Fermilab staff, one MVME processor card running VxWorks 5.5, multiple Echotek Digital Receiver boards complimented by custom made Filter Board. The VxWorks based front-end software communicates with the Main Accelerator Control software via a special

  13. Hanford Environmental Dose Reconstruction Project

    International Nuclear Information System (INIS)

    Finch, S.M.; McMakin, A.H.

    1991-04-01

    The objective of the Hanford Environmental Dose Reconstruction Project is to estimate the radiation doses that populations could have received from nuclear operations at Hanford since 1944. The project is being managed and conducted by the Pacific Northwest Laboratory (PNL) under the direction of an independent Technical Steering Panel (TSP). The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed, from released to impact on humans (dose estimates): source terms; environmental transport; environmental monitoring data; demographics, agriculture, food habits; and, environmental pathways and dose estimates

  14. Het Project Monitoring Risicofactoren en Gezondheid Nederland (MORGEN-project). Jaarverslag 1993

    NARCIS (Netherlands)

    Smit HA; Verschuren WMM; Bueno de Mesquita HB; Seidell JC; CCM

    1994-01-01

    The Monitoring Project on Risk Factors for Chronic Diseases (MORGEN-project) is conducted by the National Institute of Public Health and Environmental Protection (RIVM). Its general purpose is to determine the prevalence of risk factors for chronic diseases as well as the prevalence of some specific

  15. Inventory of current environmental monitoring projects in the US-Canadian transboundary region

    Energy Technology Data Exchange (ETDEWEB)

    Glantz, C.S.; Ballinger, M.Y.; Chapman, E.G.

    1986-05-01

    This document presents the results of a study commissioned to survey and summarize major environmental monitoring projects in the US-Canadian transboundary region. Projects with field sites located within 400 km (250 mi) of the border and active after 1980 were reviewed. The types of projects included: ambient air-quality monitoring, ambient water-quality monitoring, deposition monitoring, forest/vegetation monitoring and research, soil studies, and ecosystem studies. Ecosystem studies included projects involving the measurement of parameters from more than one monitoring category (e.g., studies that measured both water and soil chemistry). Individual descriptions were formulated for 184 projects meeting the spatial and temporal criteria. Descriptions included the official title for the project, its common abbreviation, program emphasis, monitoring site locations, time period conducted, parameters measured, protocols employed, frequency of sample collection, data storage information, and the principal contact for the project. A summary inventory subdivided according to the six monitoring categories was prepared using a computerized data management system. Information on major centralized data bases in the field of environmental monitoring was also obtained, and summary descriptions were prepared. The inventory and data base descriptions are presented in appendices to this document.

  16. Automation of technical specification monitoring for nuclear power plants

    International Nuclear Information System (INIS)

    Lin, J.C.; Abbott, E.C.; Hubbard, F.R.

    1986-01-01

    The complexity of today's nuclear power plants combined with an equally detailed regulatory process makes it necessary for the plant staff to have access to an automated system capable of monitoring the status of limiting conditions for operation (LCO). Pickard, Lowe and Garrick, Inc. (PLG), has developed the first of such a system, called Limiting Conditions for Operation Monitor (LIMCOM). LIMCOM provides members of the operating staff with an up-to-date comparison of currently operable equipment and plant operating conditions with what is required in the technical specifications. LIMCOM also provides an effective method of screening tagout requests by evaluating their impact on the LCOs. Finally, LIMCOM provides an accurate method of tracking and scheduling routine surveillance. (author)

  17. Manhattan Project Technical Series: The Chemistry of Uranium (I)

    International Nuclear Information System (INIS)

    Rabinowitch, E. I.; Katz, J. J.

    1947-01-01

    This constitutes Chapters 11 through 16, inclusive, of the Survey Volume on Uranium Chemistry prepared for the Manhattan Project Technical Series. Chapters are titled: Uranium Oxides, Sulfides, Selenides, and Tellurides; The Non-Volatile Fluorides of Uranium; Uranium Hexafluoride; Uranium-Chlorine Compounds; Bromides, Iodides, and Pseudo-Halides of Uranium; and Oxyhalides of Uranium.

  18. Manhattan Project Technical Series: The Chemistry of Uranium (I)

    Energy Technology Data Exchange (ETDEWEB)

    Rabinowitch, E. I. [Argonne National Lab. (ANL), Argonne, IL (United States); Katz, J. J. [Argonne National Lab. (ANL), Argonne, IL (United States)

    1947-03-10

    This constitutes Chapters 11 through 16, inclusive, of the Survey Volume on Uranium Chemistry prepared for the Manhattan Project Technical Series. Chapters are titled: Uranium Oxides, Sulfides, Selenides, and Tellurides; The Non-Volatile Fluorides of Uranium; Uranium Hexafluoride; Uranium-Chlorine Compounds; Bromides, Iodides, and Pseudo-Halides of Uranium; and Oxyhalides of Uranium.

  19. The research project on technical information basis for aging management in Fukui and Kinki area. Final report

    International Nuclear Information System (INIS)

    Fujimura, Kimiya; Nagayama, Shigeru; Watarumi, Chikae; Toudou, Tsugihiko

    2011-01-01

    The Research Project on Technical Information Basis for Aging Management was initiated in FY2006 by the Nuclear and Industrial Safety Agency (NISA) of the Ministry of Economy, Trade and Industry (METI) as a five-year program effectively, to promote aging management of domestic nuclear power plants. Its main objective was to improve the technical basis on which aging nuclear power plants are regulated. Upon taking part in the technical strategy map for Aging Management and Safe Long Term Operation, the experiences and achievements of the participating organizations were taken into account and the following four topics were chosen. The regional characteristics of the Fukui and Kinki area where 15 nuclear power plants, mainly PWRs, and many nuclear related research institutes and universities are located, were also considered. 1) The improvement of pipe thinning management in nuclear power plants, 2) The development of inspection techniques to monitor the initiation and propagation of defects, 3) The development of a guideline for evaluating weld repair methods, 4) The development of a guideline for evaluating the degradation of main structures. To promote this research project, INSS has established a regional consortium (called the 'Fukui Regional Cluster' in coordination with universities, research institutes, electric utilities and venders in the Fukui and Kinki area. INSS is acting as a coordinator to make contracts, facilitate execution, and compile annual reports. In FY2010, 11 continuing research subjects were proposed for this project and all were accepted. Of these, 5 subjects were related to the first topic (pipe thinning), 4 subjects to the second topic (inspection technique) and 1 subject to each of the other two topics (weld repair and main structures). All the subjects have been completed, fulfilling the requirements and expectations. (author)

  20. Site Screening and Technical Guidance for Monitored Natural Attenuation at DOE Sites

    Energy Technology Data Exchange (ETDEWEB)

    Borns, D.J.; Brady, P.V.; Brady, W.D.; Krupka, K.M.; Spalding, B.P.; Waters, R.D.; Zhang, P.

    1999-03-01

    Site Screening and Technical Guidance for Monitored Natural Attenuation at DOE Sites briefly outlines the biological and geochemical origins of natural attenuation, the tendency for natural processes in soils to mitigate contaminant transport and availability, and the means for relying on monitored natural attenuation (MNA) for remediation of contaminated soils and groundwaters. This report contains a step-by-step guide for (1) screening contaminated soils and groundwaters on the basis of their potential for remediation by natural attenuation and (2) implementing MNA consistent with EPA OSWER Directive 9200.4-17. The screening and implementation procedures are set up as a web-based tool (http://www.sandia.gov/eesector/gs/gc/na/mnahome.html) to assist US Department of Energy (DOE) site environmental managers and their staff and contractors to adhere to EPA guidelines for implementing MNA. This document is intended to support the Decision Maker's Framework Guide and Monitoring Guide both to be issued from DOE EM-40. Further technical advances may cause some of the approach outlined in this document to change over time.

  1. Preliminary site characterization radiological monitoring plan for the Nevada Nuclear Waste Storage Investigations Project, Yucca Mountain Site

    International Nuclear Information System (INIS)

    1987-03-01

    The activities described in this plan occur in the early phases of site characterization. This document presents the Preliminary Site Characterization Radiological Monitoring Plan (PSCRMP) for collecting and evaluating data in support of the NNWSI Project. The PSCRMP defines and identifies control procedures for the monitoring activities. The PSCRMP activity will utilize integrating radon monitoring devices, a continuous radon monitor, and a particulate air sampler. These instruments will be used to establish the baseline radioactivity and/or radioactivity released due to early site characterization activities. The sections that follow provide a general project description, the specifics of the monitoring program, and the practices that will be employed to ensure the validity of the collected data by integrating quality assurance into all activities. Section 2 of this document describes the regulatory base of this document. Section 3 describes the site characterization activities which may lead to release of radioactivity. Section 4 provides a description of the potential sources of radioactivity that site characterization could generate. Section 5 summarizes the sampling and monitoring methodology, which will be used to monitor the potential sources of radioactivity. The network of sampling and monitoring equipment is described in Section 6, and Section 7 summarizes the systems operation activities. The data reporting activities are described in Section 8. Finally, a description of the Quality Assurance (QA) and Quality Control (QC) activities is provided in Section 9. Appendix A contains a summary of the procedures to be used in this program, and Appendix B contains technical specification on equipment and services. 20 refs., 11 figs., 2 tabs

  2. Solar Wind Monitor--A School Geophysics Project

    Science.gov (United States)

    Robinson, Ian

    2018-01-01

    Described is an established geophysics project to construct a solar wind monitor based on a nT resolution fluxgate magnetometer. Low-cost and appropriate from school to university level it incorporates elements of astrophysics, geophysics, electronics, programming, computer networking and signal processing. The system monitors the earth's field in…

  3. THE RELATIONSHIP BETWEEN TECHNICAL AND SOCIAL NORMS IN ENVIRONMENTAL PROJECT

    Directory of Open Access Journals (Sweden)

    Jasminka Lažnjak

    1992-12-01

    Full Text Available In the article the relationship between system of technical and system of social norms in ecological project has been considered from constructivist standpoint in sociology of technology. For adequate solution of technological problem of enviromental pollution by hydrocarbons is necessary to define beside technical also system of social norms. Sociological analysis of accidents in transportation of hydrocarbons is suggested in purpose of clear definition of responsibilities of certain social actors and for modification of existing laws for enviromental protection (the paper is published in Croatian.

  4. Yucca Mountain Site Characterization Project: Technical data catalog,(quarterly supplement)

    International Nuclear Information System (INIS)

    1993-01-01

    The June 1, 1985, Department of Energy (DOE)/Nuclear Regulatory Commission (NRC) Site-Specific Procedural Agreement for Geologic Repository Site Investigation and Characterization Program requires the DOE to develop and maintain a catalog of data which will be updated and provided to the NRC at least quarterly. This catalog is to include a description of the data; the time (date), place, and method of acquisition; and where it may be examined. The Yucca Mountain Site Characterization Project (YMP) Technical Data Catalog is published and distributed in accordance with the requirements of the Site-Specific Agreement. The YMP Technical Data Catalog is a report based on reference information contained in the YMP Automated Technical Data Tracking System (ATDT). The reference information is provided by Participants for data acquired or developed in support of the YMP. The Technical Data Catalog is updated quarterly and published in the month following the end of each quarter. A complete revision to the Catalog is published at the end of each fiscal year

  5. Yucca Mountain Project technical status report (TSR), October 1989--March 1990

    International Nuclear Information System (INIS)

    1990-01-01

    This Yucca Mountain Project Technical Status Report (TSR) on site characterization is the second in a series of reports that will be issued at approximately six-month intervals during site characterization. In addition, progress made toward the initiation and conduct of new site characterization activities is included. For this report, information on the technical progress made by Yucca Mountain Project participating organizations has been compiled covering the period from October 1989, through March 31, 1990. The status report consists of three sections: an introductory section; a section on the status of site characterization, which includes preparatory activities, sites programs, repository design, seals system design, waste package design, and performance assessment; and a reference section, which provides a complete listing of all published documents cited in the text. 59 refs

  6. Project Design Concept for Monitoring and Control System

    International Nuclear Information System (INIS)

    MCGREW, D.L.

    2000-01-01

    This Project Design Concept represents operational requirements established for use in design the tank farm Monitoring and Control System. These upgrades are included within the scope of Project W-314, Tank Farm Restoration and Safe Operations

  7. An IoT Project for Vital Signs Monitoring

    Directory of Open Access Journals (Sweden)

    Felician ALECU

    2017-01-01

    Full Text Available Nowadays, the Internet of Things (IoT projects are very popular and they are developed for numerous fields. In order to detect various medical problems on time, it is required to monitor the subjects either human or non-human. This could be used on regular or specific activities, like sport or work. It is necessary to determine the factors that could lead to medical problems. Another important aspect is to quantify the factors, to monitor them, to collect data and to make the proper interpretation. This could be achieved using dedicated sensors, controlled by an application embedded on a development board. When a dangerous value is reached, the system has to inform the subject (if human or someone else (if non-human. This paper presents an Arduino based IoT project used for monitoring the vital signs for human and non-human and the results based on its usage. The paper details the hardware and software components of this project.

  8. Implementation of quality improvement techniques for management and technical processes in the ACRV project

    Science.gov (United States)

    Raiman, Laura B.

    1992-12-01

    Total Quality Management (TQM) is a cooperative form of doing business that relies on the talents of everyone in an organization to continually improve quality and productivity, using teams and an assortment of statistical and measurement tools. The objective of the activities described in this paper was to implement effective improvement tools and techniques in order to build work processes which support good management and technical decisions and actions which are crucial to the success of the ACRV project. The objectives were met by applications in both the technical and management areas. The management applications involved initiating focused continuous improvement projects with widespread team membership. The technical applications involved applying proven statistical tools and techniques to the technical issues associated with the ACRV Project. Specific activities related to the objective included working with a support contractor team to improve support processes, examining processes involved in international activities, a series of tutorials presented to the New Initiatives Office and support contractors, a briefing to NIO managers, and work with the NIO Q+ Team. On the technical side, work included analyzing data from the large-scale W.A.T.E.R. test, landing mode trade analyses, and targeting probability calculations. The results of these efforts will help to develop a disciplined, ongoing process for producing fundamental decisions and actions that shape and guide the ACRV organization .

  9. Implementation of quality improvement techniques for management and technical processes in the ACRV project

    Science.gov (United States)

    Raiman, Laura B.

    1992-01-01

    Total Quality Management (TQM) is a cooperative form of doing business that relies on the talents of everyone in an organization to continually improve quality and productivity, using teams and an assortment of statistical and measurement tools. The objective of the activities described in this paper was to implement effective improvement tools and techniques in order to build work processes which support good management and technical decisions and actions which are crucial to the success of the ACRV project. The objectives were met by applications in both the technical and management areas. The management applications involved initiating focused continuous improvement projects with widespread team membership. The technical applications involved applying proven statistical tools and techniques to the technical issues associated with the ACRV Project. Specific activities related to the objective included working with a support contractor team to improve support processes, examining processes involved in international activities, a series of tutorials presented to the New Initiatives Office and support contractors, a briefing to NIO managers, and work with the NIO Q+ Team. On the technical side, work included analyzing data from the large-scale W.A.T.E.R. test, landing mode trade analyses, and targeting probability calculations. The results of these efforts will help to develop a disciplined, ongoing process for producing fundamental decisions and actions that shape and guide the ACRV organization .

  10. Monitoring the effectiveness evaluation of investment projects

    Directory of Open Access Journals (Sweden)

    Skopin Alex O.

    2012-02-01

    Full Text Available The article raised the question of monitoring regulatory evaluation of the effectiveness of regional investment projects. This is justified by the fact that the current regulatory framework defined indicators for measuring the effectiveness of regional investment projects, but these figures are usually used only at the design stage of the project, an interim assessment of the effectiveness of a sufficiently simplified and based on the level of exploration investment.

  11. General technical requirements (GTR) for inventory monitoring systems (IMS) for the trilateral initiative

    International Nuclear Information System (INIS)

    Pshakin, Gennady M.; Kuleshov, I.; Shea, T.; Puckett, J.M.; Zhukov, I.; Mangan, Dennis L.; Matter, John C.; Waddoups, I.; Smathers, D.; Abhold, M.E.; Hsue, S.-T.; Chiaro, P.

    2002-01-01

    Pursuant to the Trilateral Initiative, the three parties (The Russian Federation, the United States, and the International Atomic Energy Agency) have been engaged in discussions concerning the structure of reliable monitoring systems for storage facilities having large inventories. The intent of these monitoring systems is to provide the capability for the IAEA to maintain continuity of knowledge in a sufficiently reliable manner that should there be equipment failure, loss of continuity of knowledge would be restricted to a small population of the inventory, and thus reinventory of the stored items would be minimized These facility-specific monitoring systems, referred to as Inventory Monitoring Systems (IMS) are to provide the principal means for the M A to assure that the containers of fissile material remain accounted under the Verification Agreements which are to be concluded between the IAEA and the Russian Federation and the lAEA and the United States for the verification of weapon-origin and other fissile material specified by each State as released from its defense programs. A technical experts working group for inventory monitoring systems has been meeting since Feb- of 2000 to formulate General Technical Requirements (GTR) for Inventory Monitoring Systems for the Trilateral Initiative. Although provisional agreement has been reached by the three parties concerning the GTR, it is considered a living document that can be updated as warranted by the three parties. This paper provides a summary of the GTR as it currently exists.

  12. Technical solutions for waste treatment in the Belene project

    International Nuclear Information System (INIS)

    Büttner, K.; Eichhorn, H.

    2011-01-01

    Outline: In June 2010 NUKEM Technologies GmbH was awarded a contract from ATOMSTROYEXPORT JSC to perform the complete work package related to designing and completion of the equipment for treatment of radioactive waste on the turn-key basis for Belene NPP. Technical Solutions: Waste Streams and Technologies at UKC and UKS; Concentration Plant; Thermal Treatment of Resins Sorting Facility; Biological Waste Water Treatment; Conditioning – Cementation • Sorting of Radwaste; Plasma Facility; Grouting; Filter Press; Monitoring and Tracking

  13. Staff training program of CANDU projects in Saskatoon

    International Nuclear Information System (INIS)

    Huterer, J.

    1996-01-01

    This paper describes the training process for a nuclear project on a new site. When AECL opened a project office Saskatoon, senior management recognized the need for large scale staff training and made the necessary commitments. Two types of training programs were initiated, general and technical. The general training plan included topics related to nuclear project life cycle. Technical training was discipline and task specific. Based on the job descriptions and staff qualifications, technical training requirements were documented for the entire staff. The training strategy was developed and implemented. Detailed records were maintained to monitor the progress, draw conclusions, and plan training for future nuclear facilities. (author)

  14. A Framework for Effective Software Monitoring in Project Management

    African Journals Online (AJOL)

    A Framework for Effective Software Monitoring in Project Management. ... is shown to provide meaningful interpretation of collected metric data by embedding certain quality function. Key words: Project Management, Feedback, project control, metrics, process model, quantitative validity ... AJOL African Journals Online.

  15. A synthesis of evaluation monitoring projects by the forest health monitoring program (1998-2007)

    Science.gov (United States)

    William A. Bechtold; Michael J. Bohne; Barbara L. Conkling; Dana L. Friedman

    2012-01-01

    The national Forest Health Monitoring Program of the Forest Service, U.S. Department of Agriculture, has funded over 200 Evaluation Monitoring projects. Evaluation Monitoring is designed to verify and define the extent of deterioration in forest ecosystems where potential problems have been identified. This report is a synthesis of results from over 150 Evaluation...

  16. Near-facility environmental monitoring quality assurance project plan

    International Nuclear Information System (INIS)

    McKinney, S.M.

    1997-01-01

    This Quality Assurance Project Plan addresses the quality assurance requirements for the activities associated with the preoperational and near facility environmental monitoring performed by Waste Management Federal Services, Inc., Northwest Operations and supersedes WHC-EP-0538-2. This plan applies to all sampling and monitoring activities performed by waste management Federal Services, Inc., Northwest Operations in implementing facility environmental monitoring at the Hanford Site

  17. Addressing Common Student Technical Errors in Field Data Collection: An Analysis of a Citizen-Science Monitoring Project.

    Science.gov (United States)

    Philippoff, Joanna; Baumgartner, Erin

    2016-03-01

    The scientific value of citizen-science programs is limited when the data gathered are inconsistent, erroneous, or otherwise unusable. Long-term monitoring studies, such as Our Project In Hawai'i's Intertidal (OPIHI), have clear and consistent procedures and are thus a good model for evaluating the quality of participant data. The purpose of this study was to examine the kinds of errors made by student researchers during OPIHI data collection and factors that increase or decrease the likelihood of these errors. Twenty-four different types of errors were grouped into four broad error categories: missing data, sloppiness, methodological errors, and misidentification errors. "Sloppiness" was the most prevalent error type. Error rates decreased with field trip experience and student age. We suggest strategies to reduce data collection errors applicable to many types of citizen-science projects including emphasizing neat data collection, explicitly addressing and discussing the problems of falsifying data, emphasizing the importance of using standard scientific vocabulary, and giving participants multiple opportunities to practice to build their data collection techniques and skills.

  18. Addressing Common Student Technical Errors in Field Data Collection: An Analysis of a Citizen-Science Monitoring Project

    Directory of Open Access Journals (Sweden)

    Joanna Philippoff

    2015-11-01

    Full Text Available The scientific value of citizen-science programs is limited when the data gathered are inconsistent, erroneous, or otherwise unusable. Long-term monitoring studies, such as Our Project In Hawai‘i's Intertidal (OPIHI, have clear and consistent procedures and are thus a good model for evaluating the quality of participant data. The purpose of this study was to examine the kinds of errors made by student researchers during OPIHI data collection and factors that increase or decrease the likelihood of these errors. Twenty-four different types of errors were grouped into four broad error categories: missing data, sloppiness, methodological errors, and misidentification errors. “Sloppiness” was the most prevalent error type. Error rates decreased with field trip experience and student age. We suggest strategies to reduce data collection errors applicable to many types of citizen-science projects including emphasizing neat data collection, explicitly addressing and discussing the problems of falsifying data, emphasizing the importance of using standard scientific vocabulary, and giving participants multiple opportunities to practice to build their data collection techniques and skills.

  19. Healy Clean Coal Project, Healy, Alaska final Environmental Monitoring Plan

    Energy Technology Data Exchange (ETDEWEB)

    1994-06-14

    This Environmental Monitoring Plan (EMP) provides the mechanism to evaluate the integrated coal combustion/emission control system being demonstrated by the Healy Clean Coal Project (HCCP) as part-of the third solicitation of the US Department of Energy (DOE) Clean Coal Technology Demonstration Program (CCT-III). The EMP monitoring is intended to satisfy two objectives: (1) to develop the information base necessary for identification, assessment, and mitigation of potential environmental problems arising from replication of the technology and (2) to identify and quantify project-specific and site-specific environmental impacts predicted in the National Environmental Policy Act (NEPA) documents (Environmental Impact Statement and Record of Decision). The EMP contains a description of the background and history of development of the project technologies and defines the processes that will take place in the combustion and spray dryer absorber systems, including the formation of flash-calcined material (FCM) and its use in sulfur dioxide (SO{sub 2}) removal from the flue gases. It also contains a description of the existing environmental resources of the project area. The EMP includes two types of environmental monitoring that are to be used to demonstrate the technologies of the HCCP: compliance monitoring and supplemental monitoring. Compliance monitoring activities include air emissions, wastewater effluents, and visibility. Monitoring of these resources provide the data necessary to demonstrate that the power plant can operate under the required state and federal statutes, regulations, and permit requirements.

  20. Project W-420 Ventilation Stack Monitoring System Year 2000 Compliance Assessment Project Plan

    International Nuclear Information System (INIS)

    BUSSELL, J.H.

    1999-01-01

    This document contains a limited assessment of Year 2000 compliance for Project W-420. Additional information is provided as a road map to project documents and other references that may be used to verify Year 2000 compliance. This assessment describes the potential Year 2000 (Y2K) problems and describes the methods for achieving Y2K Compliance for Project W-420, Ventilation Stack Monitoring Systems Upgrades. The purpose of this assessment is to give an overview of the project. This document will not be updated and any dates contained in this document are estimates and may change. The project work scope includes upgrades to ventilation stacks and generic effluent monitoring systems (GEMS) at the 244-A Double Contained Receiver Tank (DCRT), the 244-BX DCRT, the 244-CR Vault, tanks 241-C-105 and 241-C-106, the 244-S DCRT, and the 244-TX DCRT. A detailed description of system dates, functions, interfaces, potential Y2K problems, and date resolutions can not be described since the project is in the definitive design phase, This assessment will describe the methods, protocols, and practices to ensure that equipment and systems do not have Y2K problems

  1. Set up of an environmental monitoring system, Shchuchye, Russia - technical assistance - 59042

    International Nuclear Information System (INIS)

    Belbeze, Stephane; Hallouin, Matthieu

    2012-01-01

    An intergovernmental agreement on cooperation about chemical weapon destruction was signed between France and the Russian federation on 14. February 2006 in the context of a Global Partnership dedicated to preventing catastrophic terrorism and the proliferation of weapons of mass destruction. It came into effect on 25 April 2007 after ratification by both countries. The present demonstrated project was launched as part of this collaboration on the Shchuchye site (Russia - Kurgan Oblast). The project concerned the environmental surveillance system for the Shchuchye site required for the safe operation of the installation used to destroy chemical weapons. The aim was to implement equipments and methods of analysis for very low concentrations of pollutants in the three environmental compartments: air, water and soil. This has been achieved with the help of industry and other organizations in France (Environment/SA for supplies, INERIS and Antea Group) and Russia (ROST Association and EKROS Engineering). This system takes account of the normal operation of the installation as well as incident management. It includes 11 stationary atmospheric measuring stations constructed by Environment/SA and EKROS Engineering including ASTEK dedicated toxic gas detector: 'Terminator FOV-1', 3 mobile atmospheric measuring stations, 2 mobile soil and water measuring stations, 4 sampling cars constructed by Environment/SA and EKROS Engineering, a complete Chemical analysis laboratory which can handle ppb analysis of toxic gases, organics and minerals pollutants, an information collection center and a meteo station which can retrieve, display and archive all the data or alarm from the stationary and mobile stations. Antea Group has provided a technical expertise and various negotiations during the negotiation phase, the project initiation files and contracts redaction, the project Monitoring and reporting to stakeholders, the Rex. Up to 2009, No other site of the world uses such an

  2. Technical specification for the Quality Information Management System (QIMS) Pilot Project

    Energy Technology Data Exchange (ETDEWEB)

    Hall, R.C.; Claussen, L.M.; Thurston, I.

    1992-01-01

    This document contains implementation details for the Quality Information Management System (QIMS) Pilot Project, which has been released for VAX/VMS systems using the INGRES RDBMS. The INGRES Applications-By-Forms (ABF) software development tool was used to define the modules and screens which comprise the QIMS Pilot application. These specifications together with the QIMS information model and corresponding database definition constitute the QIMS technical specification and implementation description presented herein. The QIMS Pilot Project represents a completed software product which has been released for production use. Further extension projects are planned which will release new versions for QIMS. These versions will offer expanded and enhanced functionality to meet further customer requirements not accommodated by the QIMS Pilot Project.

  3. Project W-420 Ventilation Stack Monitoring System Year 2000 Compliance Assessment Project Plan

    International Nuclear Information System (INIS)

    BUSSELL, J.H.

    1999-01-01

    This assessment describes the potential Year 2000 (Y2K) problems and describes the methods for achieving Y2K Compliance for Project W-420, Ventilation Stack Monitoring Systems Upgrades. The purpose of this assessment is to give an overview of the project. This document will not be updated and any dates contained in this document are estimates and may change. The project work scope includes upgrades to ventilation stacks and generic effluent monitoring systems (GEMS) at the 244-A Double Contained Receiver Tank (DCRT), the 244-BX DCRT, the 244-CR Vault, tanks 241-C-105 and 241-C-106, the 244-S DCRT, and the 244-TX DCRT. A detailed description of system dates, functions, interfaces, potential Y2K problems, and date resolutions can not be described since the project is in the definitive design phase, This assessment will describe the methods, protocols, and practices to ensure that equipment and systems do not have Y2K problems

  4. An Evaluation of the Science Education Component of the Cross River State Science and Technical Education Project

    Science.gov (United States)

    Ekuri, Emmanuel Etta

    2012-01-01

    The Cross River State Science and Technical Education Project was introduced in 1992 by edict number 9 of 20 December 1991, "Cross River State Science and Technical Education Board Edit, 20 December, 1991", with the aim of improving the quality of science teaching and learning in the state. As the success of the project depends…

  5. Data-intensive structural health monitoring in the infrawatch project

    NARCIS (Netherlands)

    Veerman, R.P.; Miao, S.; Koenders, E.A.B.; Knobbe, A.

    2013-01-01

    The InfraWatch project is a Dutch research project, aimed at developing novel techniques for large-scale monitoring of concrete infra-structures. The project involves a large bridge, fitted with multiple types of sensors that capture the high-resolution dynamic behavior of the bridge. With 145

  6. Summary of the technical guidelines used in the project: The economics of greenhouse gas limitations

    International Nuclear Information System (INIS)

    Halsnaes, Kirsten

    1998-01-01

    This document is a summary version of the technical guidelines for climate change mitigation assessment developed as a part of the Global Environment Facility (GEF) project The Economics of Greenhouse Gas Limitations; Technical guidelines (UNEP 1998). The objectives of this project have been to support the development of a methodology, an implementing framework and a reporting system which countries can use in the construction of national climate change policies and in meeting their future reporting obligations under the FCCC. The methodological framework developed in the guidelines covers key economic concepts, scenario building, modelling tools and common assumptions. It was used by several country studies included in the project. (au)

  7. Development of Distributed Research Center for monitoring and projecting regional climatic and environmental changes: first results

    Science.gov (United States)

    Gordov, Evgeny; Shiklomanov, Alexander; Okladinikov, Igor; Prusevich, Alex; Titov, Alexander

    2016-04-01

    Description and first results of the cooperative project "Development of Distributed Research Center for monitoring and projecting of regional climatic and environmental changes" recently started by SCERT IMCES and ESRC UNH are reported. The project is aimed at development of hardware and software platform prototype of Distributed Research Center (DRC) for monitoring and projecting regional climatic and environmental changes over the areas of mutual interest and demonstration the benefits of such collaboration that complements skills and regional knowledge across the northern extratropics. In the framework of the project, innovative approaches of "cloud" processing and analysis of large geospatial datasets will be developed on the technical platforms of two U.S. and Russian leading institutions involved in research of climate change and its consequences. Anticipated results will create a pathway for development and deployment of thematic international virtual research centers focused on interdisciplinary environmental studies by international research teams. DRC under development will comprise best features and functionality of earlier developed by the cooperating teams' information-computational systems RIMS (http://rims.unh.edu) and CLIMATE(http://climate.scert.ru/), which are widely used in Northern Eurasia environment studies. The project includes several major directions of research (Tasks) listed below. 1. Development of architecture and defining major hardware and software components of DRC for monitoring and projecting of regional environmental changes. 2. Development of an information database and computing software suite for distributed processing and analysis of large geospatial data hosted at ESRC and IMCES SB RAS. 3. Development of geoportal, thematic web client and web services providing international research teams with an access to "cloud" computing resources at DRC; two options will be executed: access through a basic graphical web browser and

  8. Improving Perinatal Care in the Rural Regions Worldwide by Wireless Enabled Antepartum Fetal Monitoring: A Demonstration Project

    Directory of Open Access Journals (Sweden)

    Roberto Tapia-Conyer

    2015-01-01

    Full Text Available Background. Fetal and neonatal morbidity and mortality are significant problems in developing countries; remote maternal-fetal monitoring offers promise in addressing this challenge. The Gary and Mary West Health Institute and the Instituto Carlos Slim de la Salud conducted a demonstration project of wirelessly enabled antepartum maternal-fetal monitoring in the state of Yucatán, Mexico, to assess whether there were any fundamental barriers preventing deployment and use. Methods. Following informed consent, high-risk pregnant women at 27–29 weeks of gestation at the Chemax primary clinic participated in remote maternal-fetal monitoring. Study participants were randomized to receive either prototype wireless monitoring or standard-of-care. Feasibility was evaluated by assessing technical aspects of performance, adherence to monitoring appointments, and response to recommendations. Results. Data were collected from 153 high-risk pregnant indigenous Mayan women receiving either remote monitoring (n=74 or usual standard-of-care (n=79. Remote monitoring resulted in markedly increased adherence (94.3% versus 45.1%. Health outcomes were not statistically different in the two groups. Conclusions. Remote maternal-fetal monitoring is feasible in resource-constrained environments and can improve maternal compliance for monitoring sessions. Improvement in maternal-fetal health outcomes requires integration of such technology into sociocultural context and addressing logistical challenges of access to appropriate emergency services.

  9. Improving Perinatal Care in the Rural Regions Worldwide by Wireless Enabled Antepartum Fetal Monitoring: A Demonstration Project

    Science.gov (United States)

    Tapia-Conyer, Roberto; Lyford, Shelley; Saucedo, Rodrigo; Casale, Michael; Gallardo, Hector; Becerra, Karen; Mack, Jonathan; Mujica, Ricardo; Estrada, Daniel; Sanchez, Antonio; Sabido, Ramon; Meier, Carlos; Smith, Joseph

    2015-01-01

    Background. Fetal and neonatal morbidity and mortality are significant problems in developing countries; remote maternal-fetal monitoring offers promise in addressing this challenge. The Gary and Mary West Health Institute and the Instituto Carlos Slim de la Salud conducted a demonstration project of wirelessly enabled antepartum maternal-fetal monitoring in the state of Yucatán, Mexico, to assess whether there were any fundamental barriers preventing deployment and use. Methods. Following informed consent, high-risk pregnant women at 27–29 weeks of gestation at the Chemax primary clinic participated in remote maternal-fetal monitoring. Study participants were randomized to receive either prototype wireless monitoring or standard-of-care. Feasibility was evaluated by assessing technical aspects of performance, adherence to monitoring appointments, and response to recommendations. Results. Data were collected from 153 high-risk pregnant indigenous Mayan women receiving either remote monitoring (n = 74) or usual standard-of-care (n = 79). Remote monitoring resulted in markedly increased adherence (94.3% versus 45.1%). Health outcomes were not statistically different in the two groups. Conclusions. Remote maternal-fetal monitoring is feasible in resource-constrained environments and can improve maternal compliance for monitoring sessions. Improvement in maternal-fetal health outcomes requires integration of such technology into sociocultural context and addressing logistical challenges of access to appropriate emergency services. PMID:25691900

  10. Understanding Project Based Production through Socio-technical Modularity

    DEFF Research Database (Denmark)

    Thuesen, Christian Langhoff

    This paper develops an approach for understanding Project Based Production. This form of production is characterized by unique deliverables, high complexity, high value, high risk, profound uncertainty and many stakeholders and is increasingly important the postmodern society. Common to the pract......This paper develops an approach for understanding Project Based Production. This form of production is characterized by unique deliverables, high complexity, high value, high risk, profound uncertainty and many stakeholders and is increasingly important the postmodern society. Common...... to the practices of PBP and other production practices is the goal of balancing the dilemma between creativity and productivity. In response to industrialized production, the concept of modularity gained popularity for addressing this dilemma by exploring product, process and organization structures. However...... with the starting point in system theory and a strong bias towards industrial production, the predominant understanding of modularity faces difficulty in explaining practices of Project Based Production in both social – technical and dynamic – stable aspects. Illustrated by a case the paper addresses this gap...

  11. Tools for Monitoring Social Media: A Marketing Research Project

    Science.gov (United States)

    Veeck, Ann; Hoger, Beth

    2014-01-01

    Knowledge of how to effectively monitor social media is an increasingly valued marketing research skill. This study tests an approach for adding social media content to an undergraduate marketing research class team project. The revised project maintains the expected objectives and parameters of a traditional research project, while integrating…

  12. Quality Assurance Project Plan for Facility Effluent Monitoring Plan activities

    International Nuclear Information System (INIS)

    Nickels, J.M.

    1991-06-01

    This Quality Assurance Project Plan addresses the quality assurance requirements for the Facility Monitoring Plans of the overall site-wide environmental monitoring plan. This plan specifically applies to the sampling and analysis activities and continuous monitoring performed for all Facility Effluent Monitoring Plan activities conducted by Westinghouse Hanford Company. It is generic in approach and will be implemented in conjunction with the specific requirements of individual Facility Effluent Monitoring Plans. This document is intended to be a basic road map to the Facility Effluent Monitoring Plan documents (i.e., the guidance document for preparing Facility Effluent Monitoring Plans, Facility Effluent Monitoring Plan determinations, management plan, and Facility Effluent Monitoring Plans). The implementing procedures, plans, and instructions are appropriate for the control of effluent monitoring plans requiring compliance with US Department of Energy, US Environmental Protection Agency, state, and local requirements. This Quality Assurance Project Plan contains a matrix of organizational responsibilities, procedural resources from facility or site manuals used in the Facility Effluent Monitoring Plans, and a list of the analytes of interest and analytical methods for each facility preparing a Facility Effluent Monitoring Plan. 44 refs., 1 figs., 2 tabs

  13. A Review of the New European Technical Recommendations for Monitoring Individuals Occupationally Exposed to External Radiation

    International Nuclear Information System (INIS)

    Dijk, J.W.E. van; Alves, J.G.; Ambrosi, P.; Bartlett, D.T.; Currivan, L.; Fantuzzi, E.; Kamenopoulou, V.

    2013-01-01

    This paper reviews the revised Technical Recommendations for Monitoring Individuals Occupationally Exposed to External Radiation as issued by the European Commission as Radiation Protection 160. These recommendations are aimed at all stakeholders in radiation protection dosimetry with an emphasis in the responsible technical staff of approved dosimetry services. This paper briefly touches each Chapter and ends with a more in depth section on the uncertainty evaluation of dose measurements. -- Highlights: ► Recommendations on all aspects of running an approved dosimetry service. ► Radiation protection framework. ► Metrology of personal dosimeters. ► QC and QA of individual monitoring

  14. Office of Crystalline Repository Development FY 83 technical project plan

    International Nuclear Information System (INIS)

    1983-03-01

    The technical plan for FY 83 activities of the Office of Crystalline Repository Development is presented in detail. Crystalline Rock Project objectives are discussed in relation to the National Waste Terminal storage (NWTS) program. The plan is in full compliance with requirements mandated by the Nuclear Waste Policy Act of 1982. Implementation will comply with the requirements and criteria set forth in the Nuclear Regulatory Commission regulations (10 CFR 60) and the Environmental Protection Agency standard (40 CFR 191). Technical approaches and the related milestones and schedules are presented for each of the Level 3 NWTS work Breakdown Structure Tasks. These are: Systems, Waste Package, Site, Repository, Regulatory and Institutional, Test Facilities and Excavations, Land Acquisition, and Program Management

  15. Hanford Environmental Dose Reconstruction Project monthly report

    International Nuclear Information System (INIS)

    Finch, S.M.

    1990-12-01

    The objective of the Hanford Environmental Dose Reconstruction Project is to estimate the radiation doses that populations could have been have received from nuclear operations at Hanford since 1944. The project is being managed and conducted by the Pacific Northwest Laboratory (PNL) under the direction of an independent Technical Steering Panel (TSP). The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed, from release to impact on humans (dose estimates): source terms; environmental transport; environmental monitoring data; demographics, agriculture, food habits; and environmental pathways and dose estimates. 3 figs., 3 tabs

  16. Propose Reactor Control and Monitoring System for RTP

    International Nuclear Information System (INIS)

    Mohd Sabri Minhat; Izhar Abu Hussin; Mohd Idris Taib; Mohd Khairulezwan Abdul Manan; Nurfarhana Ayuni Joha

    2011-01-01

    Reactor control and monitoring system is a one of the important features used in reactor. The control and monitoring must come together to provide safety, excellent performance and reliable in nuclear reactor technology application. Objectives of this technical paper are to design and propose reactor control system and reactor monitoring system in Research Reactor (RTP) for Reactor Upgrading Project. (author)

  17. The WATCH All-Sky Monitor for the Granat Project

    DEFF Research Database (Denmark)

    Brandt, Søren; Lund, Niels; Rao, A. R.

    1990-01-01

    The Watch X-ray all-sky monitor, which is designed to localize strong X-ray sources and follow their development, is examined, focusing on the addition of four Watch units to the Granat satellite project. The components of the Watch instrument are described and the capabilities and potential...... scientific returns of the Granat project are discussed. The applications of the Watch monitor are given, including the study of time variations of known sources and the detection and localization of new, transient sources....

  18. Outdoor radon monitoring plan for the UMTRA Project sites

    International Nuclear Information System (INIS)

    1986-02-01

    This document describes the monitoring schedules and methods used to measure ambient radon concentrations around Uranium Mill Tailings Remedial Action (UMTRA) Project sites. Radon monitoring at both processing sites and disposal sites is performed primarily for two reasons. The first, and foremost, of these is to provide a means to keep the off-site radon concentrations during the construction activities As Low As Reasonably Achievable (ALARA). The second purpose is to provide a basis for comparison with the EPA standards developed for the UMTRA Project. Radon monitoring data are also used to demonstrate compliance with ambient concentration standards and for public information due to concern about potential radiation releases during construction. 1 fig., 1 tab

  19. TANK FARM REMEDIATION TECHNOLOGY DEVELOPMENT PROJECT AN EXERCISE IN TECHNICAL & REGULATORY COLLABORATION

    Energy Technology Data Exchange (ETDEWEB)

    JARAYSI, M.N.

    2007-01-08

    The Tank Farm Remediation Technology Development Project at the Hanford Site focuses on waste storage tanks, pipelines and associated ancillary equipment that are part of the C-200 single-shell tank (SST) farm system located in the C Tank Farm. The purpose of the project is to obtain information on the implementation of a variety of closure activities and to answer questions on technical, operational and regulatory issues associated with closure.

  20. Comprehensive assessment of the status scientific and technical projects using Technology Project Readiness Level

    Directory of Open Access Journals (Sweden)

    A. N. Petrov

    2016-01-01

    Full Text Available The balanced methodology for assessing the Technology Project Readiness Level for commercialization (TPRL is proposed. TPRL allows to determine the dynamics and balance of development projects that use the standardized approaches used in assessing the readiness of the technology. Validation of the methodology undertaken for the projects of Federal target programs “Research and development on priority directions of development of scientific-technological complex of Russia for 2007–2013” and “Research and development on priority directions of development of scientific-technological complex of Russia for 2014–2020”. The obtained results showed the possibility of application of the methodology for the evaluation of projects, improving efficiency of expert activity in the evaluation of projects, monitoring the status of individual project and group of projects (portfolio. The application of the methodology allowed us to improve the management of individual project and portfolio of projects.Methodology TPRL will allow the implementers, industry partners, investors, and innovative industrial companies to improve the efficiency of its activities.

  1. Atmosphere Resource Recovery & Environmental Monitoring for Long Duration Exploration Project

    Data.gov (United States)

    National Aeronautics and Space Administration — The AES Atmosphere Resource Recovery & Environmental Monitoring (ARREM) for Long Duration Exploration Project project is maturing Atmosphere Revitalization...

  2. Technical and economical assesment of uranium mine closing down in Romania

    International Nuclear Information System (INIS)

    Cotrau, M.; Georgescu, P. D.

    2000-01-01

    The work presents the technical and economical aspects of two uranium mine closing down after 40 years of operation. Remedial actions, underground water decontamination, ecological programs and environmental effect monitoring are discussed. The technical and economical aspects related to the mine closing down are the following: recovering of recyclable equipment and materials; measures of controlling the mine void flooding; measures of controlling, directing and treatment of contaminated mine waters; site rehabilitation and land reclamation; treatment of surface waters; environment monitoring for as long as ten years. The funds for these projects are provided by government and a PHARE program. (authors)

  3. Monitoring and Evaluation of Soil Conversation and Watershed Development Projects

    NARCIS (Netherlands)

    Graaff, de J.; Cameron, J.; Sombatpani, S.; Pieri, C.; Woodhill, A.J.

    2007-01-01

    Part One of this book introduces the challenges of monitoring and evaluating interventions designed by technical experts meeting the needs of people who actually use the environment which the interventions are seeking to modify. The chapters in this section seek reconciliation of these tensions

  4. Stack monitor for the Proof-of-Breeding Project

    International Nuclear Information System (INIS)

    Fergus, R.W.

    1985-01-01

    This stack monitor system is a coordinated arrangement of hardware and software to monitor four hot cells (8 stacks) during the fuel dissection for the Proof-of-Breeding Project. The cell monitors, which are located in fan lofts, contain a microprocessor, radiation detectors, air flow sensors, and air flow control equipment. Design criteria included maximizing microprocessor control while minimizing the hardware complexity. The monitors have been programmed to produce concentration and total activity release data based on several detector measurements and flow rates. Although each monitor can function independently, a microcomputer can also be used to control each cell monitor including reprogramming if necessary. All programming is software, as opposed to firmware, with machine language for compactness in the cell monitors and Basic language for adaptability in the microcomputer controller

  5. An Effective Health and Medical Technical Authority

    Science.gov (United States)

    Fogarty, Jennifer A.

    2009-01-01

    The NASA Governance model directed the formation of three Technical Authorities, Engineering; Safety and Mission Assurance; and Health and Medical, to ensure that risks are identified and adjudicated efficiently and transparently in concert with the spaceflight programs and projects. The Health and Medical Technical Authority (HMTA) has been implemented at the Johnson Space Center (JSC) and consists of the Chief Medical Office (CMO), the Deputy CMO, and HMTA Delegates. The JSC HMTA achieves the goals of risk identification and adjudication through the discharge of the appropriate technical expertise to human space flight programs and projects and the escalation of issues within program and technical authority boards. The JSC HMTA relies on subject matter experts (SMEs) in the Space Life Sciences Directorate at JSC as well as experts from other Centers to work crew health and performance issues at the technical level, develop requirements, oversee implementation and validation of requirements, and identify risks and non-compliances. Once a risk or potential noncompliance has been identified and reported to the programs or projects, the JSC HMTA begins to track it and closely monitor the program's or project's response. As a risk is developed or a non-compliance negotiated, positions from various levels of decision makers are sought at the program and project control boards. The HMTA may support a program or project position if it is satisfied with the decision making and vetting processes (ex. the subject matter expert voiced his/her concerns and all dissenting opinions were documented) and finds that the position both acknowledges the risk and cost of the mitigation and resolves the issue without changing NASA risk posture. The HMTA may disagree with a program or project position if the NASA risk posture has been elevated or obfuscated. If the HMTA does disagree with the program or project position, it will appeal to successively higher levels of authority so that

  6. Reflecting socio-technical combinations in radioactive waste management. Results from the InSOTEC European research project

    International Nuclear Information System (INIS)

    Kallenbach-Herbert, Beate; Bergmans, Anne; Martell, Meritxell; Schroeder, Jantine

    2015-01-01

    InSOTEC is a three-year collaborative social sciences research project funded under the European Atomic Energy Community's 7th Framework Programme FP7. The project aims to generate a better understanding of the complex interplay between the technical and the social in the context of geological disposal of radioactive waste. In doing so, InSOTEC has moved beyond the social and technical division that is frequently being found in this context by - investigating the consideration of social sciences and the recognition of socio-technical combinations in research programs on geological disposal, - analyzing the socio-technical entanglement in selected contexts like siting, reversibility and retrievability, demonstrating safety and technology transfer on the basis of case studies, and - exploring the integration of diverse stakeholders in technology oriented networks. The analyses reveal that activities in the context of geological disposal, whether related to research, planning, siting etc., rather support the divide of social and technical aspects than fostering the consideration of their entanglement. Reasons identified for this are manifold. The wish to reduce complexity by focusing stakeholder involvement on social questions and fixing the technical part ''when acceptance is reached'' is only one of them. However, the analyses also show that over the long timescales of repository planning and implementation, robust management strategies must provide the flexibility to adapt to both technical and social developments and demands. Understanding the socio-technical interplay and creating structures for its consideration provides the basis for dealing with this challenge. This presentation will focus on the main findings of the InSOTEC project with regard to the consideration of socio-technical combinations in practice. These insights are currently under development and will be finalized at the end of the project in June 2014. We will reflect on

  7. Reflecting socio-technical combinations in radioactive waste management. Results from the InSOTEC European research project

    Energy Technology Data Exchange (ETDEWEB)

    Kallenbach-Herbert, Beate [Oeko-Institut e.V., Darmstadt (Germany); Bergmans, Anne [Antwerp Univ. (Belgium); Martell, Meritxell [Merience Strategic Thinking, Olerdola (Spain); Schroeder, Jantine [Antwerp Univ. (Belgium); SCK - CEN, Mol (Belgium)

    2015-07-01

    InSOTEC is a three-year collaborative social sciences research project funded under the European Atomic Energy Community's 7th Framework Programme FP7. The project aims to generate a better understanding of the complex interplay between the technical and the social in the context of geological disposal of radioactive waste. In doing so, InSOTEC has moved beyond the social and technical division that is frequently being found in this context by - investigating the consideration of social sciences and the recognition of socio-technical combinations in research programs on geological disposal, - analyzing the socio-technical entanglement in selected contexts like siting, reversibility and retrievability, demonstrating safety and technology transfer on the basis of case studies, and - exploring the integration of diverse stakeholders in technology oriented networks. The analyses reveal that activities in the context of geological disposal, whether related to research, planning, siting etc., rather support the divide of social and technical aspects than fostering the consideration of their entanglement. Reasons identified for this are manifold. The wish to reduce complexity by focusing stakeholder involvement on social questions and fixing the technical part ''when acceptance is reached'' is only one of them. However, the analyses also show that over the long timescales of repository planning and implementation, robust management strategies must provide the flexibility to adapt to both technical and social developments and demands. Understanding the socio-technical interplay and creating structures for its consideration provides the basis for dealing with this challenge. This presentation will focus on the main findings of the InSOTEC project with regard to the consideration of socio-technical combinations in practice. These insights are currently under development and will be finalized at the end of the project in June 2014. We will reflect on

  8. FINAL TECHNICAL REPORT: Underwater Active Acoustic Monitoring Network For Marine And Hydrokinetic Energy Projects

    Energy Technology Data Exchange (ETDEWEB)

    Stein, Peter J. [Scientific Solutions, Inc, Nashua, NH (United States); Edson, Patrick L. [Scientific Solutions, Inc, Nashua, NH (United States)

    2013-12-20

    This project saw the completion of the design and development of a second generation, high frequency (90-120 kHz) Subsurface-Threat Detection Sonar Network (SDSN). The system was deployed, operated, and tested in Cobscook Bay, Maine near the site the Ocean Renewable Power Company TidGen™ power unit. This effort resulted in a very successful demonstration of the SDSN detection, tracking, localization, and classification capabilities in a high current, MHK environment as measured by results from the detection and tracking trials in Cobscook Bay. The new high frequency node, designed to operate outside the hearing range of a subset of marine mammals, was shown to detect and track objects of marine mammal-like target strength to ranges of approximately 500 meters. This performance range results in the SDSN system tracking objects for a significant duration - on the order of minutes - even in a tidal flow of 5-7 knots, potentially allowing time for MHK system or operator decision-making if marine mammals are present. Having demonstrated detection and tracking of synthetic targets with target strengths similar to some marine mammals, the primary hurdle to eventual automated monitoring is a dataset of actual marine mammal kinematic behavior and modifying the tracking algorithms and parameters which are currently tuned to human diver kinematics and classification.

  9. ''RESURS'' - The Russian scientific-technical programme for NPP equipment lifetime monitoring, estimation, prediction and management

    International Nuclear Information System (INIS)

    Emelyanov, V.

    1994-01-01

    RESURS programme is described implementation of which will allow to work out regulatory-methodological basis providing legal and technical solution of NPP equipment lifetime management, prediction, monitoring and estimation problems

  10. Project management metrics, KPIs, and dashboards a guide to measuring and monitoring project performance

    CERN Document Server

    Kerzner, Harold

    2013-01-01

    Today, with the growth of complex projects, stakeholder involvement in projects, advances in computer technology for dashboard designs, metrics, and key performance indicators for project management have become an important focus. This Second Edition of the bestselling book walks readers through everything from the basics of project management metrics and key performance indicators to establishing targets and using dashboards to monitor performance. The content is aligned with PMI's PMBOK Guide and stresses "value" as the main focal point.

  11. The remote monitoring systems LOVER and RECOVER for international safeguards technical, economic and legal aspects

    International Nuclear Information System (INIS)

    Lauppe, W.D.; Stein, G.; Rezniczek, A.; Stienen, U.

    1983-12-01

    The electronic remote monitoring systems RECOVER and LOVER were developed to comply with the IAEA's tasks concerning international nuclear materials safeguards with the aim of reducing the inspection expenditure and enhancing control effectiveness. The present study on the technical, economic and legal aspects of an application of these systems is intended to show possible implications and provide argumentation aids for discussions on the application of these systems. RECOVER and LOVER offer the possibility of establishing a direct communication path between containment and surveillance system (c/s), instruments at the site of application and a central monitoring station. The demonstration versions of both systems have shown that remote interrogation of data under safeguards-specific boundary conditions (e.g. requirement of tamper safety) will be technically feasible. (orig./HP)

  12. Yucca Mountain Site Characterization Project Technical Data Catalog (quarterly supplement)

    International Nuclear Information System (INIS)

    1993-01-01

    The June 1, 1985, Department of Energy (DOE)/Nuclear Regulatory Commission (NRC) Site-Specific Procedural Agreement for Geologic Repository Site Investigation and Characterization Program requires the DOE to develop and maintain a catalog of data which will be updated and provided to the NRC at least quarterly. This catalog is to include a description of the data; the time (date), place, and method of acquisition; and where it may be examined. The Yucca Mountain Site Characterization Project (YMP) Technical Data Catalog is published and distributed in accordance with the requirements of the Site-Specific Agreement. The YMP Technical Data Catalog is a report based on reference information contained in the YMP Automated Technical Data Tracking System (ATDT). The reference information is provided by Participants for data acquired or developed in support of the YMP. The Technical Data Catalog is updated quarterly and published in the month following the end of each quarter. A complete revision to the Catalog is published at the end of each fiscal year. Supplements to the end-of-year edition are published each quarter. These supplements provide information related to new data items not included in previous quarterly updates and data items affected by changes to previously published reference information. The Technical Data Catalog, dated December 31, 1992, should be retained as the baseline document for the supplements until the end-of-year revision is published and distributed in October 1993

  13. Yucca Mountain Site Characterization Project: Technical Data Catalog quarterly supplement

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-03-31

    The March 21, 1993, Department of Energy (DOE)/Nuclear Regulatory Commission (NRC) Site-Specific Procedural Agreement for Geologic Repository Site Investigation and Characterization Program requires the DOE to develop and maintain a catalog of data which will be updated and provided to the NRC at least quarterly. This catalog is to include a description of the data; the time (date), place, and method of acquisition; and where it may be examined. The Yucca Mountain Site Characterization Project (YMP) Technical Data Catalog is published and distributed in accordance with the requirements of the Site-Specific Agreement. The YMP Technical Data Catalog is a report based on reference information contained in the YMP Automated Technical Data Tracking System (ATDT). The reference information is provided by Participants for data acquired or developed in support of the YMP. The Technical Data Catalog is updated quarterly and published in the month following the end of each quarter. A complete revision to the Catalog is published at the end of each fiscal year. Supplements to the end-of-year edition are published each quarter. These supplements provide information related to new data items not included in previous quarterly updates and data items affected by changes to previously published reference information. The Technical Data Catalog, dated September 30, 1993, should be retained as the baseline document for the supplements until the end-of-year revision is published and distributed in October 1994.

  14. Yucca Mountain Site Characterization Project technical data catalog: Quarterly supplement

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-12-31

    The Department of Energy (DOE)/Nuclear Regulatory Commission (NRC) Site-Specific Procedural Agreement for Geologic Repository Site Investigation and Characterization Program requires the DOE to develop and maintain a catalog of data which will be updated and provided to the NRC at least quarterly. This catalog is to include a description of the data; the time (date), place, and method of acquisition; and where the data may be examined. The Yucca Mountain Site Characterization Project (YMP) Technical Data Catalog is published and distributed-in accordance with the requirements of the Site-Specific Agreement. The YMP Technical Data Catalog is a report based on reference information contained in the YMP Automated Technical Data Tracking System (ATDT). The reference information is provided by Participants for data acquired or developed in support of the YMP. The Technical Data Catalog is updated quarterly and distributed in the month following the end of each quarter. A complete revision to the catalog is published at the end of each fiscal year. Supplements to the end-of-year edition are published each quarter. These supplements provide information related to new data items not included in previous quarterly updates and data items affected by changes to previously published reference information. The Technical Data Catalog, dated September 30, 1994, should be retained as the baseline document for the supplements until the end-of-year revision is published and distributed in October 1995.

  15. The technical status of the supersara project at its termination

    International Nuclear Information System (INIS)

    Markovina, A.; Randles, J.

    1987-01-01

    On March 10th 1983 the Council of Ministers of the European Community adopted the decision to abandon the SuperSARA project. In the frame of this decision, the Management of the SuperSARA project formulated the guidelines to close the project, which included the preparation of the present final report. This report presents the final status of the project, which means that it reflects the situation in March 1983, with a few updates introduced shortly afterwards in conformity with the safety requirements which were being revised at that time. The aim of this report is to give a general description of activities which were carried on to implement the experimental programme and to illustrate some important achievements reached in specific areas. In addition, it is also intended to provide the access key to the documentation which was produced in the past years, so as to make the most significant technical material easily available for any possible future use

  16. Final Technical Report, Wind Generator Project (Ann Arbor)

    Energy Technology Data Exchange (ETDEWEB)

    Geisler, Nathan [City of Ann Arbor, MI (United States)

    2017-03-20

    A Final Technical Report (57 pages) describing educational exhibits and devices focused on wind energy, and related outreach activities and programs. Project partnership includes the City of Ann Arbor, MI and the Ann Arbor Hands-on Museum, along with additional sub-recipients, and U.S. Department of Energy/Office of Energy Efficiency and Renewable Energy (EERE). Report relays key milestones and sub-tasks as well as numerous graphics and images of five (5) transportable wind energy demonstration devices and five (5) wind energy exhibits designed and constructed between 2014 and 2016 for transport and use by the Ann Arbor Hands-on Museum.

  17. PERMEABLE TREATMENT WALL EFFECTIVENESS MONITORING PROJECT, NEVADA STEWART MINE

    Science.gov (United States)

    This report summarizes the results of Mine Waste Technology Program (MWTP) Activity III, Project 39, Permeable Treatment Wall Effectiveness Monitoring Project, implemented and funded by the U.S. Environmental Protection Agency (EPA) and jointly administered by EPA and the U.S. De...

  18. UMTRA Project water sampling and analysis plan, Durango, Colorado. Revision 1

    International Nuclear Information System (INIS)

    1995-09-01

    Planned, routine ground water sampling activities at the US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project site in Durango, Colorado, are described in this water sampling and analysis plan. The plan identifies and justifies the sampling locations, analytical parameters, detection limits, and sampling frequency for the routine monitoring stations at the site. The ground water data are used to characterize the site ground water compliance strategies and to monitor contaminants of potential concern identified in the baseline risk assessment (DOE, 1995a). Regulatory basis for routine ground water monitoring at UMTRA Project sites is derived from the US EPA regulations in 40 CFR Part 192 (1994) and EPA standards of 1995 (60 FR 2854). Sampling procedures are guided by the UMTRA Project standard operating procedures (SOP) (JEG, n.d.), the Technical Approach Document (TAD) (DOE, 1989), and the most effective technical approach for the site

  19. Monitoring the Durability Performance of Concrete in Nuclear Waste Containment. Technical Progress Report No. 3

    International Nuclear Information System (INIS)

    Ulm, Franz-Josef

    2000-01-01

    OAK-B135 Monitoring the Durability Performance of Concrete in Nuclear Waste Containment. Technical Progress Report No. 3(NOTE: Part II A item 1 indicates ''PAPER'', but a report is attached electronically)

  20. An Approach to Tailoring Major Technical Reviews Based on Project Characteristics and Stakeholder Interests

    Science.gov (United States)

    Richstein, Alan B.; Nolte, Jerome T.; Pfarr, Barbara B.

    2004-01-01

    There are numerous technical reviews that occur throughout the systems engineering process life cycle. Many are well known by project managers and stakeholders such as developers and end users, an example of much is the critical design review (CDR). This major milestone for a large, complex new project may last two or more days, include an extensive agenda of topics, and entail hundreds of hours of developer time to prepare presentation materials and associated documents. Additionally, the weeks of schedule spent on review preparation is at least partly at the expense of other work. This paper suggests an approach for tailoring technical reviews, based on the project characteristics and the project manager s identification of the key stakeholders and understanding of their most important issues and considerations. With this insight the project manager can communicate to, manage expectations oc and establish formal agreement with the stakeholders as to which reviews, and at what depth, are most appropriate to achieve project success. The authors, coming from diverse organizations and backgrounds, have drawn on their personal experiences and summarized the best practices of their own organizations to create a common framework to provide guidance on the adaptation of design reviews to other system engineers.

  1. Improvement of technical measures to detect and respond to illicit trafficking of nuclear and radioactive materials [Results of a coordinated research project 2003-2006

    International Nuclear Information System (INIS)

    2008-07-01

    This publication summarizes the research conducted during an IAEA Coordinated Research Project (CRP) undertaken to address technical and operational difficulties in the detection of and response to illicit trafficking of nuclear material. Equipment to detect illicit trafficking of nuclear and radioactive materials at borders has specific technical and operational requirements that are very different from equipment used in other radiation monitoring cases. Automated and manual measurements need to be done in the field, often outdoors, at land or sea borders, crossing points or airports. The free flow of goods and passengers must not be impacted, thus requiring that the measurement time be short. The design needs to take into account that the users of the equipment are not experts in radiation detection; thus the results of the measurements should be easy to understand

  2. TANK FARM REMEDIATION TECHNOLOGY DEVELOPMENT PROJECT AN EXERCISE IN TECHNICAL and REGULATORY COLLABORATION

    International Nuclear Information System (INIS)

    JARAYSI, M.N.

    2007-01-01

    The Tank Farm Remediation Technology Development Project at the Hanford Site focuses on waste storage tanks, pipelines and associated ancillary equipment that are part of the C-200 single-shell tank (SST) farm system located in the C Tank Farm. The purpose of the project is to obtain information on the implementation of a variety of closure activities and to answer questions on technical, operational and regulatory issues associated with closure

  3. Final Technical Report of the project "Controlling Quantum Information by Quantum Correlations"

    Energy Technology Data Exchange (ETDEWEB)

    Girolami, Davide [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2018-01-17

    The report describes hypotheses, aims, methods and results of the project 20170675PRD2, “Controlling Quantum Information by Quantum Correlations”, which has been run from July 31, 2017 to January 7, 2018. The technical work has been performed by Director’s Fellow Davide Girolami of the T-4 Division, Physics of Condensed Matter and Complex Systems, under the supervision of Wojciech Zurek (T-4), Lukasz Cincio (T-4), and Marcus Daniels (CCS-7). The project ended as Davide Girolami has been converted to J. R. Oppenheimer Fellow to work on the project 20180702PRD1, “Optimal Control of Quantum Machines”, started on January 8, 2018.

  4. Rapid biochemical functionalization of technical surfaces by means of a photobleaching-based maskless projection lithography process

    Science.gov (United States)

    Waldbaur, Ansgar; Waterkotte, Björn; Leuthold, Juerg; Schmitz, Katja; Rapp, Bastian E.

    2013-03-01

    MEMS/MOEMS based systems are increasingly applied in the biological and biomedical context, e.g. in form of biosensors or substrates for monitoring biological responses such as cell migration. For such applications, technical surfaces have to be provided with suitable biochemical functionalization. Typical functionalization procedures include wet-chemical techniques based on self-assembled monolayers of thiols on gold or silanes on glass. These processes create binary patterns and are often of limited use if spatially constrained non-binary patterns like surface bound biochemical gradients have to be provided. In order to create gradients or patterns, methods such as direct spotting or dip pen nanolithography can be used. Here, gradients can be emulated by varying the spot density or the concentration of the solutions employed. However, these methods are serial in nature and are thus of limited use if large surface areas have to be patterned. We present a technique to generate gradients of biochemical function by a photobleaching-based process allowing fast large-scale patterning. The process is based on photobleaching resulting in light-induced coupling of a fluorescently tagged biomolecule to a technical surface by concerted bleaching of the fluorophore. We custom designed a maskless projection lithography system based on a digital mirror device that allows the rapid creation of 8-bit grayscale protein patterns on any technical surface from digital data (e.g. bitmap files). We demonstrate how this process can be used to obtain patterns of several cm2 lateral size at micrometer resolution within minutes.

  5. 100-N pilot project: Proposed consolidated groundwater monitoring program

    International Nuclear Information System (INIS)

    Borghese, J.V.; Hartman, M.J.; Lutrell, S.P.; Perkins, C.J.; Zoric, J.P.; Tindall, S.C.

    1996-11-01

    This report presents a proposed consolidated groundwater monitoring program for the 100-N Pilot Project. This program is the result of a cooperative effort between the Hanford Site contractors who monitor the groundwater beneath the 100-N Area. The consolidation of the groundwater monitoring programs is being proposed to minimize the cost, time, and effort necessary for groundwater monitoring in the 100-N Area, and to coordinate regulatory compliance activities. The integrity of the subprograms requirements remained intact during the consolidation effort. The purpose of this report is to present the proposed consolidated groundwater monitoring program and to summarize the process by which it was determined

  6. AFSC/ABL: Southeast Coastal Monitoring Project - CTD database

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The Southeast Alaska Coastal Monitoring (SECM) project in Alaska was initiated in 1997 by the Auke Bay Laboratory, National Marine Fisheries Service, to study the...

  7. Transmission Line Security Monitor: Final Report

    Energy Technology Data Exchange (ETDEWEB)

    John Svoboda

    2011-04-01

    The Electric Power Transmission Line Security Monitor System Operational Test is a project funded by the Technical Support Working Group (TSWG). TSWG operates under the Combating Terrorism Technical Support Office that functions under the Department of Defense. The Transmission Line Security Monitor System is based on technology developed by Idaho National Laboratory. The technology provides a means for real-time monitoring of physical threats and/or damage to electrical transmission line towers and conductors as well as providing operational parameters to transmission line operators to optimize transmission line operation. The end use is for monitoring long stretches of transmission lines that deliver electrical power from remote generating stations to cities and industry. These transmission lines are generally located in remote transmission line corridors where security infrastructure may not exist. Security and operational sensors in the sensor platform on the conductors take power from the transmission line and relay security and operational information to operations personnel hundreds of miles away without relying on existing infrastructure. Initiated on May 25, 2007, this project resulted in pre-production units tested in realistic operational environments during 2010. A technology licensee, Lindsey Manufacturing of Azusa California, is assisting in design, testing, and ultimately production. The platform was originally designed for a security monitoring mission, but it has been enhanced to include important operational features desired by electrical utilities.

  8. Effluent monitoring Quality Assurance Project Plan for radioactive airborne emissions data. Revision 2

    International Nuclear Information System (INIS)

    Frazier, T.P.

    1995-12-01

    This Quality Assurance Project Plan addresses the quality assurance requirements for compiling Hanford Site radioactive airborne emissions data. These data will be reported to the U.S. Environmental Protection Agency, the US Department of Energy, and the Washington State Department of Health. Effluent Monitoring performs compliance assessments on radioactive airborne sampling and monitoring systems. This Quality Assurance Project Plan is prepared in compliance with interim guidelines and specifications. Topics include: project description; project organization and management; quality assurance objectives; sampling procedures; sample custody; calibration procedures; analytical procedures; monitoring and reporting criteria; data reduction, verification, and reporting; internal quality control; performance and system audits; corrective actions; and quality assurance reports

  9. 75 FR 26743 - Pacific Gas and Electric Company; Notice of Environmental Site Review and Technical Meetings To...

    Science.gov (United States)

    2010-05-12

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12779-005] Pacific Gas and Electric Company; Notice of Environmental Site Review and Technical Meetings To Discuss Information and Monitoring Needs for a License Application for a Pilot Project May 5, 2010. a. Type of Application: Draft Pilot License Application. b. Project N...

  10. Technical Analysis of Projects Being Funded by the DOE Hydrogen Program

    Energy Technology Data Exchange (ETDEWEB)

    Edward G. Skolnik

    2006-02-10

    In July 2000, Energetics began a project in which we performed site-visit based technical analyses or evaluations on hydrogen R&D projects for the purpose of providing in-depth information on the status and accomplishments of these projects to the public, and especially to hydrogen stakeholders. Over a three year period, 32 site-visit analyses were performed. In addition two concepts gleaned from the site visits became subjects of in depth techno-economic analyses. Finally, Energetics produced a compilation document that contains each site-visit analysis that we have performed, starting in 1996 on other contracts through the end of Year One of the current project (July 2001). This included 21 projects evaluated on previous contracts, and 10 additional ones from Year One. Reports on projects visited in Years One and Two were included in their respective Annual Reports. The Year Two Report also includes the two In-depth Analyses and the Compilation document. Reports in Year three began an attempt to perform reviews more geared to hydrogen safety. This Final Report contains a summary of the overall project, all of the 32 site-visit analyses and the two In-depth Analyses.

  11. Management of the Atmosphere Resource Recovery and Environmental Monitoring Project

    Science.gov (United States)

    Roman, Monsi; Perry, Jay; Howard, David

    2013-01-01

    The Advanced Exploration Systems Program's Atmosphere Resource Recovery and Environmental Monitoring (ARREM) project is working to further optimize atmosphere revitalization and environmental monitoring system architectures. This paper discusses project management strategies that tap into skill sets across multiple engineering disciplines, projects, field centers, and industry to achieve the project success. It is the project's objective to contribute to system advances that will enable sustained exploration missions beyond Lower Earth Orbit (LEO) and improve affordability by focusing on the primary goals of achieving high reliability, improving efficiency, and reducing dependence on ground-based logistics resupply. Technology demonstrations are achieved by infusing new technologies and concepts with existing developmental hardware and operating in a controlled environment simulating various crewed habitat scenarios. The ARREM project's strengths include access to a vast array of existing developmental hardware that perform all the vital atmosphere revitalization functions, exceptional test facilities to fully evaluate system performance, and a well-coordinated partnering effort among the NASA field centers and industry partners to provide the innovative expertise necessary to succeed.

  12. Independent technical review of the Sandia National Laboratories Environmental Restoration Project

    International Nuclear Information System (INIS)

    1994-11-01

    An Independent Technical Review was conducted of the Environmental Restoration Project. The objective of the review was recommendations, from a commercial perspective, on a systems level path forward to safe, minimum cost and schedule project completion. The work presented represents the consensus analysis and recommendations of thirteen individuals with varied backgrounds, expertise, and experience. The ITR team recommends that the barriers to the opportunity described in the diagnosis be eliminated using an integrated DOE-Sandia system approach. Piecemeal changes will not result in the desired commercial efficiency. DOE needs to operate as the contracting agency for a Major System Acquisition. If it does not, commercial performance will not be achieved regardless of the contractor. Likewise, Sandia needs to establish and implement the necessary project structure and management systems to operate with commercial contractor like efficiency

  13. Quality Assurance Project Plan for Facility Effluent Monitoring Plan activities

    International Nuclear Information System (INIS)

    Frazier, T.P.

    1994-01-01

    This Quality Assurance Project Plan addresses the quality assurance requirements for the activities associated with the Facility Effluent Monitoring Plans, which are part of the overall Hanford Site Environmental Protection Plan. This plan specifically applies to the sampling and analysis activities and continuous monitoring performed for all Facility Effluent Monitoring Plan activities conducted by Westinghouse Hanford Company. It is generic in approach and will be implemented in conjunction with the specific requirements of the individual Facility Effluent Monitoring Plans

  14. The research project on technical information basis for aging management in Fukui and Kinki area (2nd report)

    International Nuclear Information System (INIS)

    Fujimura, Kimiya; Watarumi, Chikae; Toudou, Tsugihiko

    2009-01-01

    The Research Project on Technical Information Basis for Aging Management was initiated in 2006 by the Nuclear and Industrial Safety Agency (NISA) of the Ministry of Economy, Trade and Industry (METI), to promote aging management of domestic nuclear power plants. Its main objective was to improve the technical basis on which aging plants are regulated. Upon taking part in the R and D Roadmaps for Aging Management and Safe Long Term Operation, the experience and results of the participating organizations were considered and the following four topics were extracted. The regional characteristics of the Fukui and Kinki area where 15 nuclear power plants, mainly PWRs, and many nuclear related research institutes and universities are located, were also considered. 1) The improvement of pipe thinning management in nuclear power plants. 2) The development of inspection techniques to monitor the initiation and propagation of defects. 3) The development of a guideline for evaluating weld repair methods. 4) The development of a guideline for evaluating the degradation of main structures. To promote this research project, INSS has established a regional consortium (called the 'Fukui Regional Cluster' in coordination with universities, research institutes, electric utilities and venders in the Fukui and Kinki area. INSS is acting as of coordinator to make a contracts, facilitate execution, and compile annual reports. In FY2008, 11 research subjects were proposed for this project and all were accepted. Of these, 4 subjects were related to the first topic (pipe thinning), 3 subjects were related to the second topic (inspection technique) and I subject was related to each of the other two topics (weld repair and main structures). All the subjects have been completed, fulfilling the requirements and expectations. (author)

  15. The research project on technical information basis for aging management in Fukui and Kinki area. 3rd report

    International Nuclear Information System (INIS)

    Fujimura, Kimiya; Watarumi, Chikae; Toudou, Tsugihiko

    2010-01-01

    The Research Project on Technical Information Basis for Aging Management was initiated in FY2006 by the Nuclear and Industrial Safety Agency (NISA) of the Ministry of Economy, Trade and Industry (METI), to promote aging management of domestic nuclear power plants. Its main objective was to improve the technical basis on which aging nuclear power plants are regulated. Upon taking part in the R and D Roadmaps for Aging Management and Safe Long Term Operation, the experiences and achievements of the participating organizations were taken into account and the following four topics were chosen. The regional characteristics of the Fukui and Kinki area where 15 nuclear power plants, mainly PWRs, and many nuclear related research institutes and universities are located, were also considered. (1) The improvement of pipe thinning management in nuclear power plants, (2) The development of inspection techniques to monitor the initiation and propagation of defects, (3) The development of a guideline for evaluating weld repair methods, (4) The development of a guideline for evaluating the degradation of main structures. To promote this research project, INSS has established a regional consortium (called the 'Fukui Regional Cluster' in coordination with universities, research institutes, electric utilities and venders in the Fukui and Kinki area. INSS is acting as a coordinator to make contracts, facilitate execution, and compile annual reports. In FY2009, 11 research subjects were proposed for this project and all were accepted. Of these, 4 subjects were related to the first topic (pipe thinning), 3 subjects to the second topic (inspection technique) and 1 subject to each of the other two topics (weld repair and main structures). All the subjects have been completed, fulfilling the requirements and expectations. (author)

  16. Self-monitoring and psychoeducation in bipolar patients with a smart-phone application (SIMPLe) project: design, development and studies protocols.

    Science.gov (United States)

    Hidalgo-Mazzei, Diego; Mateu, Ainoa; Reinares, María; Undurraga, Juan; Bonnín, Caterina del Mar; Sánchez-Moreno, José; Vieta, Eduard; Colom, Francesc

    2015-03-20

    New technologies have recently been used for monitoring signs and symptoms of mental health illnesses and particularly have been tested to improve the outcomes in bipolar disorders. Web-based psychoeducational programs for bipolar disorders have also been implemented, yet to our knowledge, none of them have integrated both approaches in one single intervention. The aim of this project is to develop and validate a smartphone application to monitor symptoms and signs and empower the self-management of bipolar disorder, offering customized embedded psychoeducation contents, in order to identify early symptoms and prevent relapses and hospitalizations. The project will be carried out in three complementary phases, which will include a feasibility study (first phase), a qualitative study (second phase) and a randomized controlled trial (third phase) comparing the smartphone application (SIMPLe) on top of treatment as usual with treatment as usual alone. During the first phase, feasibility and satisfaction will be assessed with the application usage log data and with an electronic survey. Focus groups will be conducted and technical improvements will be incorporated at the second phase. Finally, at the third phase, survival analysis with multivariate data analysis will be performed and relationships between socio-demographic, clinical variables and assessments scores with relapses in each group will be explored. This project could result in a highly available, user-friendly and not costly monitoring and psychoeducational intervention that could improve the outcome of people suffering from bipolar disorders in a practical and secure way. Clinical Trials.gov: NCT02258711 (October 2014).

  17. Learning from case studies and monitoring of Dutch tunnel projects

    NARCIS (Netherlands)

    Korff, M.

    2017-01-01

    Individuals and project-based organisations in the construction industry can learn in a (more) systematic way from case studies and the monitoring of underground construction works. Underground construction projects such as tunnels and excavations suffer as much or more from failure costs

  18. Hood River Monitoring and Evaluation Project, Annual Report 2002-2003.

    Energy Technology Data Exchange (ETDEWEB)

    Vaivoda, Alexis

    2004-02-01

    The Hood River Production Program Monitoring and Evaluation Project is co-managed by the Confederated Tribes of Warm Springs (CTWSRO) and the Oregon Department of Fish and Wildlife. The program is divided up to share responsibilities, provide efficiency, and avoid duplication. From October 2002 to September 2003 (FY 03) project strategies were implemented to monitor, protect, and restore anadromous fish and fish habitat in the Hood River subbasin. A description of the progress during FY 03 is reported here. Additionally an independent review of the entire program was completed in 2003. The purpose of the review was to determine if project goals and actions were achieved, look at critical uncertainties for present and future actions, determine cost effectiveness, and choose remedies that would increase program success. There were some immediate changes to the implementation of the project, but the bulk of the recommendations will be realized in coming years.

  19. Management and technical requirements for laboratories in charge of water monitoring

    International Nuclear Information System (INIS)

    Ottaviani, M.; Bonadonna, L.; Lucentini, L.; Pettine, P.

    2008-01-01

    This report completes the series of volumes focused on microbiological (Rapporti ISTISAN 07/5) and chemical methods (Rapporti ISTISAN 07/31) for the monitoring of water intended for human consumption according to the Italian Legislative Decree 31/2001 (transposition of European Directive 98/83/EC) and its integrations. The guidelines here presented concern management and technical requirements for laboratories in charge of testing parameters required by the Decree also taking into account the criteria stated by the standard UNI CEI EN ISO/IEC 17025 [it

  20. Transport Infrastructure Surveillance and Monitoring by Electromagnetic Sensing: The ISTIMES Project

    Directory of Open Access Journals (Sweden)

    Marie Bost

    2010-11-01

    Full Text Available The ISTIMES project, funded by the European Commission in the frame of a joint Call “ICT and Security” of the Seventh Framework Programme, is presented and preliminary research results are discussed. The main objective of the ISTIMES project is to design, assess and promote an Information and Communication Technologies (ICT-based system, exploiting distributed and local sensors, for non-destructive electromagnetic monitoring of critical transport infrastructures. The integration of electromagnetic technologies with new ICT information and telecommunications systems enables remotely controlled monitoring and surveillance and real time data imaging of the critical transport infrastructures. The project exploits different non-invasive imaging technologies based on electromagnetic sensing (optic fiber sensors, Synthetic Aperture Radar satellite platform based, hyperspectral spectroscopy, Infrared thermography, Ground Penetrating Radar-, low-frequency geophysical techniques, Ground based systems for displacement monitoring. In this paper, we show the preliminary results arising from the GPR and infrared thermographic measurements carried out on the Musmeci bridge in Potenza, located in a highly seismic area of the Apennine chain (Southern Italy and representing one of the test beds of the project.

  1. Technology of remote monitoring for nuclear activity monitoring

    International Nuclear Information System (INIS)

    Kwack, Ehn Ho; Kim, Jong Soo; Yoon, Wan Ki; Park, Sung Sik; Na, Won Woo; An, Jin Soo; Cha, Hong Ryul; Kim, Jung Soo

    2000-05-01

    In a view of safeguards monitoring at nuclear facilities, the monitoring is changing to remote method so that this report is described to remote monitoring(RM) applying on commercial NPP in Korea. To enhance IAEA safeguards efficiency and effectiveness, IAEA is taking into account of remote monitoring system(RMS) and testing as a field trial. IRMP(International Remote Monitoring Project) in participating many nations for development of RMS is proceeding their project such as technical exchange and research etc. In case of our country are carrying out the research relevant RM since acceptance RMS at 7th ROK-IAEA safeguards implementation review meeting. With a view to enhancement the RMS, installation location and element technology of the RM equipment are evaluated in a view of safeguards in Korea LWRs, and proposed a procedure for national inspection application through remote data evaluation from Younggwang-3 NPP. These results are large valuable to use of national inspection at time point extending installation to all Korea PWR NPP. In case of CANDU, neutron, gamma measurement and basic concept of network using optical fiber scintillating detector as remote verification method for dry storage canister are described. Also RM basic design of spent fuel transfer campaign is described that unattended RM without inspector instead of performing in participating together with IAEA and national inspector. The transfer campaign means the spent fuel storage pond to dry storage canister for about two months every year. Therefore, positively participation of IAEA strength safeguards project will be increased transparency for our nuclear activity as well as contributed to national relevant industry

  2. Technology of remote monitoring for nuclear activity monitoring

    Energy Technology Data Exchange (ETDEWEB)

    Kwack, Ehn Ho; Kim, Jong Soo; Yoon, Wan Ki; Park, Sung Sik; Na, Won Woo; An, Jin Soo; Cha, Hong Ryul; Kim, Jung Soo

    2000-05-01

    In a view of safeguards monitoring at nuclear facilities, the monitoring is changing to remote method so that this report is described to remote monitoring(RM) applying on commercial NPP in Korea. To enhance IAEA safeguards efficiency and effectiveness, IAEA is taking into account of remote monitoring system(RMS) and testing as a field trial. IRMP(International Remote Monitoring Project) in participating many nations for development of RMS is proceeding their project such as technical exchange and research etc. In case of our country are carrying out the research relevant RM since acceptance RMS at 7th ROK-IAEA safeguards implementation review meeting. With a view to enhancement the RMS, installation location and element technology of the RM equipment are evaluated in a view of safeguards in Korea LWRs, and proposed a procedure for national inspection application through remote data evaluation from Younggwang-3 NPP. These results are large valuable to use of national inspection at time point extending installation to all Korea PWR NPP. In case of CANDU, neutron, gamma measurement and basic concept of network using optical fiber scintillating detector as remote verification method for dry storage canister are described. Also RM basic design of spent fuel transfer campaign is described that unattended RM without inspector instead of performing in participating together with IAEA and national inspector. The transfer campaign means the spent fuel storage pond to dry storage canister for about two months every year. Therefore, positively participation of IAEA strength safeguards project will be increased transparency for our nuclear activity as well as contributed to national relevant industry.

  3. Project W-058 monitor and control system logic

    International Nuclear Information System (INIS)

    ROBERTS, J.B.

    1999-01-01

    This supporting document contains the printout of the control logic for the Project W-058 Monitor and Control System, as developed by Programmable Control Services, Inc. The logic is arranged in five appendices, one for each programmable logic controller console

  4. Information support of monitoring of technical condition of buildings in construction risk area

    Science.gov (United States)

    Skachkova, M. E.; Lepihina, O. Y.; Ignatova, V. V.

    2018-05-01

    The paper presents the results of the research devoted to the development of a model of information support of monitoring buildings technical condition; these buildings are located in the construction risk area. As a result of the visual and instrumental survey, as well as the analysis of existing approaches and techniques, attributive and cartographic databases have been created. These databases allow monitoring defects and damages of buildings located in a 30-meter risk area from the object under construction. The classification of structures and defects of these buildings under survey is presented. The functional capabilities of the developed model and the field of it practical applications are determined.

  5. Linear projection of technical noise for interferometric gravitational-wave detectors

    International Nuclear Information System (INIS)

    Smith, J R; Ajith, P; Grote, H; Hewitson, M; Hild, S; Lueck, H; Strain, K A; Willke, B; Hough, J; Danzmann, K

    2006-01-01

    An international network of interferometric gravitational-wave detectors is now in operation, and has entered a period of intense commissioning focused on bringing the instruments to their theoretical sensitivity limits. To expedite this process, noise analysis techniques have been developed by the groups associated with each instrument. We present methods of noise analysis that were developed and utilized for the commissioning of the GEO 600 detector. The focal point of this paper is a technique called noise projection that is used to determine the levels of contribution of various noise sources to the detector output. Example applications of this method to control loops typical of those employed in an interferometric GW detector are presented. Possible extensions of noise projections, including technical noise subtraction and gravitational-wave vetoes are also discussed

  6. Collaborative Systemwide Monitoring and Evaluation Project (CSMEP) - Year 5 : Annual Report for FY 2008.

    Energy Technology Data Exchange (ETDEWEB)

    Marmorek, David R.; Porter, Marc; Pickard, Darcy; Wieckowski, Katherine

    2008-11-19

    The Collaborative Systemwide Monitoring and Evaluation Project (CSMEP) is a coordinated effort to improve the quality, consistency, and focus of fish population and habitat data to answer key monitoring and evaluation questions relevant to major decisions in the Columbia River Basin. CSMEP was initiated by the Columbia Basin Fish and Wildlife Authority (CBFWA) in October 2003. The project is funded by the Bonneville Power Administration (BPA) through the Northwest Power and Conservation Council's Fish and Wildlife Program (NPCC). CSMEP is a major effort of the federal state and Tribal fish and wildlife managers to develop regionally integrated monitoring and evaluation (M&E) across the Columbia River Basin. CSMEP has focused its work on five monitoring domains: status and trends monitoring of populations and action effectiveness monitoring of habitat, harvest, hatcheries, and the hydrosystem. CSMEP's specific goals are to: (1) interact with federal, state and tribal programmatic and technical entities responsible for M&E of fish and wildlife, to ensure that work plans developed and executed under this project are well integrated with ongoing work by these entities; (2) document, integrate, and make available existing monitoring data on listed salmon, steelhead, bull trout and other fish species of concern; (3) critically assess strengths and weaknesses of these data for answering key monitoring questions; and (4) collaboratively design, implement and evaluate improved M&E methods with other programmatic entities in the Pacific Northwest. During FY2008 CSMEP biologists continued their reviews of the strengths and weaknesses (S&W) of existing subbasin inventory data for addressing monitoring questions about population status and trends at different spatial and temporal scales. Work was focused on Lower Columbia Chinook and steelhead, Snake River fall Chinook, Upper Columbia Spring Chinook and steelhead, and Middle Columbia River Chinook and steelhead. These

  7. UMTRA technical assistance contractor quality assurance program plan

    International Nuclear Information System (INIS)

    1994-10-01

    This Quality Assurance Program Plan (QAPP) provides the primary requirements for the integration of quality functions into all Technical Assistance Contractor (TAC) Project organization activities. The QAPP is the written directive authorized by the TAc Program Manager to accomplish this task and to implement procedures that provide the controls and sound management practices needed to ensure TAC contractual obligations are met. The QA program is designed to use monitoring, audit, and surveillance functions as management tools to ensure that all Project organization functions are executed in a manner that will protect public health and safety, promote the success of the Project, and meet or exceed contract requirements

  8. A project for monitoring trends in burn severity

    Science.gov (United States)

    Eidenshink, Jeffery C.; Schwind, Brian; Brewer, Ken; Zhu, Zhu-Liang; Quayle, Brad; Howard, Stephen M.

    2007-01-01

    Jeff Eidenshink, Brian Schwind, Ken Brewer, Zhi-Liang Zhu, Brad Quayle, and Elected officials and leaders of environmental agencies need information about the effects of large wildfires in order to set policy and make management decisions. Recently, the Wildland Fire Leadership Council (WFLC), which implements and coordinates the National Fire Plan (NFP) and Federal Wildland Fire Management Policies (National Fire Plan 2004), adopted a strategy to monitor the effectiveness of the National Fire Plan and the Healthy Forests Restoration Act (HFRA). One component of this strategy is to assess the environmental impacts of large wildland fires and identify the trends of burn severity on all lands across the United States. To that end, WFLC has sponsored a six-year project, Monitoring Trends in Burn Severity (MTBS), which requires the U.S. Department of Agriculture Forest Service (USDA-FS) and the U.S. Geological Survey (USGS) to map and assess the burn severity for all large current and historical fires. Using Landsat data and the differenced Normalized Burn Ratio (dNBR) algorithm, the USGS Center for Earth Resources Observation and Science (EROS) and USDA-FS Remote Sensing Applications Center will map burn severity of all fires since 1984 greater than 202 ha (500ac) in the east, and 404 ha (1,000 ac) in the west. The number of historical fires from this period combined with current fires occurring during the course of the project will exceed 9,000. The MTBS project will generate burn severity data, maps, and reports, which will be available for use at local, state, and national levels to evaluate trends in burn severity and help develop and assess the effectiveness of land management decisions. Additionally, the information developed will provide a baseline from which to monitor the recovery and health of fire-affected landscapes over time. Spatial and tabular data quantifying burn severity will augment existing information used to estimate risk associated with a range

  9. On-Line Monitoring of Instrument Channel Performance: Volume 3: Applications to Nuclear Power Plant Technical Specification Instrumentation

    International Nuclear Information System (INIS)

    Davis, E.; Rasmussen, B.

    2004-01-01

    This report is a guide for a technical specification change submittal and subsequent implementation of on-line monitoring for safety-related applications. This report is the third in a three-volume set. Volume 1, ''Guidelines for Model Development and Implementation'', presents the various tasks that must be completed to prepare models for and to implement an on-line monitoring system

  10. Guidelines for the environmental impact statement for the proposed Great Whale River Hydroelectric Project

    International Nuclear Information System (INIS)

    1992-01-01

    The guidelines presented on the preparation of the environmental impact statement for the Great Whale hydroelectric project by Hydro-Quebec stipulated a project justification, description of the biophysical and social environments, a project description, and that the assessment must address project impacts, mitigative and compensatory measures, environmental surveillance, monitoring, and long-term management programs. Background information presented in this document provides technical notes on the guidelines and the environmental assessment process, a glossary of terms, and biographical notes. The technical notes address guideline structure, project justification, native knowledge, evaluation issues, cumulative impacts, and the assessment and review process

  11. Hanford Environmental Dose Reconstruction Project

    International Nuclear Information System (INIS)

    McMakin, A.H.; Cannon, S.D.; Finch, S.M.

    1992-07-01

    The objective of the Hanford Environmental Dose Reconstruction (HEDR) Project is to estimate the radiation doses that individuals and populations could have received from nuclear operations at Hanford since 1944. The TSP consists of experts in environmental pathways, epidemiology, surface-water transport, ground-water transport, statistics, demography, agriculture, meteorology, nuclear engineering, radiation dosimetry, and cultural anthropology. Included are appointed technical members representing the states of Oregon, Washington, and Idaho, a representative of Native American tribes, and an individual representing the public. The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed from release to impact on humans (dose estimates): Source terms, environmental transport, environmental monitoring data, demography, food consumption, and agriculture, and environmental pathways and dose estimates. Progress is discussed

  12. Next Generation Nuclear Plant (NGNP) Prismatic HTGR Conceptual Design Project - Final Technical Report

    Energy Technology Data Exchange (ETDEWEB)

    Saurwein, John

    2011-07-15

    This report is the Final Technical Report for the Next Generation Nuclear Plant (NGNP) Prismatic HTGR Conceptual Design Project conducted by a team led by General Atomics under DOE Award DE-NE0000245. The primary overall objective of the project was to develop and document a conceptual design for the Steam Cycle Modular Helium Reactor (SC-MHR), which is the reactor concept proposed by General Atomics for the NGNP Demonstration Plant. The report summarizes the project activities over the entire funding period, compares the accomplishments with the goals and objectives of the project, and discusses the benefits of the work. The report provides complete listings of the products developed under the award and the key documents delivered to the DOE.

  13. Next Generation Nuclear Plant (NGNP) Prismatic HTGR Conceptual Design Project - Final Technical Report

    International Nuclear Information System (INIS)

    Saurwein, J.

    2011-01-01

    This report is the Final Technical Report for the Next Generation Nuclear Plant (NGNP) Prismatic HTGR Conceptual Design Project conducted by a team led by General Atomics under DOE Award DE-NE0000245. The primary overall objective of the project was to develop and document a conceptual design for the Steam Cycle Modular Helium Reactor (SC-MHR), which is the reactor concept proposed by General Atomics for the NGNP Demonstration Plant. The report summarizes the project activities over the entire funding period, compares the accomplishments with the goals and objectives of the project, and discusses the benefits of the work. The report provides complete listings of the products developed under the award and the key documents delivered to the DOE.

  14. Projects at the component development and integration facility. Quarterly technical progress report, April 1, 1994--June 30, 1994

    International Nuclear Information System (INIS)

    1994-01-01

    This quarterly technical progress report presents progress on the projects at the Component Development and Integration Facility (CDIF) during the third quarter of FY94. The CDIF is a major Department of Energy test facility in Butte, Montana, operated by MSE, Inc. Projects in progress include: Biomass Remediation Project; Heavy Metal-Contaminated Soil Project; MHD Shutdown; Mine Waste Technology Pilot Program; Plasma Projects; Resource Recovery Project; and Spray Casting Project

  15. Geothermal Reservoir Technology Research Program: Abstracts of selected research projects

    Energy Technology Data Exchange (ETDEWEB)

    Reed, M.J. (ed.)

    1993-03-01

    Research projects are described in the following areas: geothermal exploration, mapping reservoir properties and reservoir monitoring, and well testing, simulation, and predicting reservoir performance. The objectives, technical approach, and project status of each project are presented. The background, research results, and future plans for each project are discussed. The names, addresses, and telephone and telefax numbers are given for the DOE program manager and the principal investigators. (MHR)

  16. Survey on the Technology Readiness Level of R and D projects for a Technical Risk Management

    International Nuclear Information System (INIS)

    Song, S. J.; Chang, J.; Lee, K. Y.

    2008-01-01

    The purpose of applying the Technology Readiness Level/Design Readiness Level (TRL/DRL) in technical risk management is to make technology assessments, and improve communication among researchers with a consistent, systematic technology readiness Technical risk management for the Nuclear Hydrogen Production project was adopted of experience assessed with Delphi Method from the Next Generation Nuclear Plant(NGNP)of the DOE to improve the poor contactor management of the major projects which experienced cost increases and/or schedule delays in long-term. In the current phase that is doing key technology research and development projects, the technology readiness level was reviewed and applied to the Nuclear Hydrogen Production project to prepare an input for the next design phases. Based on the previous works, pre-conceptional design and key R and D works for the Nuclear Hydrogen Design and Development(NHDD) projects and the results of key research and development projects, the TRL was applied to assess the levels and compared with the advanced design stages of Westinghouse Electric Co. With this process, several issues were identified to apply the design and technology level to the familiar steps of design process and research and development projects. In order to resolve these issues, it is needed to systematically adjust and modify the current process with TRLs

  17. Metro Multnomah Wetlands - Multnomah Channel Wetland Restoration Monitoring Project

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The Multnomah Channel Wetland Restoration Monitoring Project characterizes wetlands use by juvenile salmonids and other fishes in the Multnomah Channel Marsh Natural...

  18. Workshop on regional cooperation in remote monitoring for transparency and nonproliferation

    International Nuclear Information System (INIS)

    Olsen, John; Inoue, Naoko; Hori, Masato; Hashimoto, Yu; Mochiji, Toshiro

    2006-06-01

    The Workshop on Regional Cooperation in Remote Monitoring for Transparency and Nonproliferation on 8-9 February at O'arai, Japan, brought together remote monitoring experts to share technical experience and consider potential uses of remote monitoring for nuclear transparency and strengthened nonproliferation. Sponsored by the Nuclear Nonproliferation Science and Technology Center (NPSTC) of the Japan Atomic Energy Agency (JAEA), this event gathered thirty five attendees from the JAEA, the Republic of Korea's National Nuclear Management and Control Agency (NNCA), the International Atomic Energy Agency (IAEA), and U.S. Department of Energy/National Nuclear Security Administration (DOE/NNSA). U.S. technical experts represented Sandia National Laboratories (SNL) and Los Alamos National Laboratory (LANL). Workshop discussions and interactions met or surpassed all goals: On the technical front, the JAEA, NNCA, and SNL exchanged presentations on their respective uses and technical approaches to remote monitoring. These included systems for both international safeguards and transparency. The IAEA shared valuable guidance on future remote monitoring system requirements. Following the presentations SNL conducted training in remote monitoring for technical personnel. In parallel project planning discussions, the JAEA, NNCA, SNL and the U.S. DOE reaffirmed mutual interest in regional cooperation in remote monitoring that could eventuate in exchange of safeguards-related data. A productive off-the-record session by all parties considered the path forward and established intermediate steps and time scales. The 15 of the presented papers are indexed individually. (J.P.N.)

  19. MONDO Project: real time ocean monitoring through Lagrangian drifters during offshore drilling operations

    Energy Technology Data Exchange (ETDEWEB)

    Mafra, Tatiana [Eni Oil do Brasil, Rio de Janeiro, RJ (Brazil); Fragoso, Mauricio da Rocha; Santos, Francisco Alves dos; Cruz, Leonardo M. Marques A.; Pellegrini, Julio A.C.; Cerrone, Bruna Nogueira [Prooceano, Rio de Janeiro, RJ (Brazil); Assireu, Arcilan Trevenzoli [Instituto Nacional de Pesquisas Espaciais (INPE), Sao Jose dos Campos, SP (Brazil)

    2008-07-01

    Monitoring the ocean conditions during offshore operations is essential for both operational and environmental aspects. Environmentally, not only to know better the environment where the activity is taking place, but also to be able to provide fast and accurate response in case of accidents. MONDO Project (Monitoring by Ocean Drifters) is a pioneer initiative from ENI Oil do Brasil and PROOCEANO that aimed to monitor currents as a part of a metoceanographic data monitoring project of drilling operations in Brazilian Waters, in Santos Basin throughout September to November 2007, 40 satellite tracked ocean drifters were deployed will be transmitting data up to November 2008. The results of this project can be used to study a wide range of subjects about ocean dynamics. Following the principles of social and environmental responsibility, MONDO Project aims to benefit the local ecosystem in increasing the scientific knowledge of the area to calibrate hydrodynamic models that will lead to more accurate modeling results and, as a consequence, to a better management of contingency plans. Based on these principles, the project will also provide unrestricted access to oceanographic data even after the end of operations. (author)

  20. Technical approach to finalizing sensible soil cleanup levels at the Fernald Environmental Management Project

    International Nuclear Information System (INIS)

    Carr, D.; Hertel, B.; Jewett, M.; Janke, R.; Conner, B.

    1996-01-01

    The remedial strategy for addressing contaminated environmental media was recently finalized for the US Department of Energy's (DOE) Fernald Environmental Management Project (FEMP) following almost 10 years of detailed technical analysis. The FEMP represents one of the first major nuclear facilities to successfully complete the Remedial Investigation/Feasibility Study (RI/FS) phase of the environmental restoration process. A critical element of this success was the establishment of sensible cleanup levels for contaminated soil and groundwater both on and off the FEMP property. These cleanup levels were derived based upon a strict application of Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) regulations and guidance, coupled with positive input from the regulatory agencies and the local community regarding projected future land uses for the site. The approach for establishing the cleanup levels was based upon a Feasibility Study (FS) strategy that examined a bounding range of viable future land uses for the site. Within each land use, the cost and technical implications of a range of health-protective cleanup levels for the environmental media were analyzed. Technical considerations in driving these cleanup levels included: direct exposure routes to viable human receptors; cross- media impacts to air, surface water, and groundwater; technical practicality of attaining the levels; volume of affected media; impact to sensitive environmental receptors or ecosystems; and cost. This paper will discuss the technical approach used to support the finalization of the cleanup levels for the site. The final cleanup levels provide the last remaining significant piece to the puzzle of establishing a final site-wide remedial strategy for the FEMP, and positions the facility for the expedient completion of site-wide remedial activities

  1. Skagit IMW - Skagit River Estuary Intensively Monitored Watershed Project

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — This study evaluates system-level effects of several estuary restoration projects on juvenile Chinook salmon production in the Skagit River estuary. The monitoring...

  2. Coordinated bird monitoring: Technical recommendations for military lands

    Science.gov (United States)

    Bart, Jonathan; Manning, Ann; Fischer, Richard; Eberly, Chris

    2012-01-01

    following these procedures, DoD will minimize the possibility for a proposed action to unintentionally take migratory birds at a level that would violate any of the migratory bird treaties and potentially impact mission activities. In addition, implementing conservation and monitoring programs for migratory birds supports the ecosystem integrity necessary to sustain DoD's natural resources for the military mission.Non-compliance with the procedural requirements of the MBTA could result in a private party lawsuit under the Administrative Procedures Act (APA). A lawsuit filed under APA involving a Navy bombing range is the basis for a court ruling that unintentional take of migratory birds applies to federal actions. Ensuring the necessary data is available to adequately assess impacts of a proposed action will help avoid lawsuits or help ensure such lawsuits have no grounds. The data gathered in a bird monitoring program will provide the best scientific data available to assess the expected impacts of a proposed action on migratory bird species through the NEPA process. This report presents recommendations developed by the U.S. Geological Survey (USGS) for the Department of Defense (DoD) on establishing a "Coordinated Bird Monitoring (CBM) Plan." The CBM Plan is intended to ensure that DoD meets its conservation and regulatory responsibilities for monitoring birds (Chapter 1). The report relies heavily on recommendations in the report, "Opportunities for improving avian monitoring" (http://www.nabci-us.org/aboutnabci/monitoringreportfinal0307.pdf), by the U.S. North American Bird Conservation Initiative (U.S. NABCI Monitoring Subcommittee, 2007) and on a review of 358 current DoD bird monitoring programs carried out as part of this project (Chapter 2). This report contains 12 recommendations which, if followed, would result in a comprehensive, efficient, and useful approach to bird monitoring. The recommendations are based on the entire report but are presented together at

  3. Eighth experts meeting on environmental radioactivity monitoring: Technical and organisational means for an optimised measurement of ambient radioactivity in the environment of nuclear facilities

    International Nuclear Information System (INIS)

    1991-01-01

    The plant-specific emission monitoring and environmental monitoring near nuclear facilities are part of the items of the agreement between the EC and the IAEA, for mutual rapid information in the case of accidents. The lectures presented to the technical discussion meeting deal with the legal and technical aspects involved. Dispersion models, computer-aided dispersion models, computer-aided information systems and advanced programs as well as measuring techniques and results of the emission monitoring and environmental monitoring near nuclear facilities are the aspects of main interest discussed at the meeting. (DG) [de

  4. Project T.E.A.M. (Technical Education Advancement Modules). Advanced Statistical Process Control.

    Science.gov (United States)

    Dunlap, Dale

    This instructional guide, one of a series developed by the Technical Education Advancement Modules (TEAM) project, is a 20-hour advanced statistical process control (SPC) and quality improvement course designed to develop the following competencies: (1) understanding quality systems; (2) knowing the process; (3) solving quality problems; and (4)…

  5. Fiscal Year 2005 Integrated Monitoring Plan for the Hanford Groundwater Performance Assessment Project

    International Nuclear Information System (INIS)

    Rieger, JoAnne T.; Hartman, Mary J.

    2005-01-01

    Groundwater is monitored in hundreds of wells at the Hanford Site to fulfill a variety of requirements. Separate monitoring plans are prepared for various purposes, but sampling is coordinated and data are shared among users. DOE manages these activities through the Hanford Groundwater Performance Assessment Project, which is the responsibility of Pacific Northwest National Laboratory. The groundwater project integrates monitoring for various objectives into a single sampling schedule to avoid redundancy of effort and to improve efficiency of sample collection.This report documents the purposes and objectives of groundwater monitoring at the DOE Hanford Site in southeastern Washington State

  6. Nearshore and offshore environmental effects monitoring at the Sable Offshore Energy project

    International Nuclear Information System (INIS)

    Hurley, G. V.

    2000-01-01

    A monitoring program to determine whether any temporary or permanent environmental perturbations may be attributable to the Sable offshore gas pipeline project as it approaches landfall at Goldboro through an outer bay is discussed, This nearshore region is an active fishing region for the residents of Goldboro, hence the concern about possible contamination. The monitoring project began with a baseline study, followed by monitoring the construction and the recovery period following construction, to ensure that any persistent changes to the nearshore aquatic environment were documented. The monitoring study included representatives of the fishing community to ensure that concerns are addressed early and on a continuing basis. At various phases of the project water properties,sediment modelling, the effects of construction on sea bottom conditions, benthic biota and cultivated mussels, water quality, phytoplankton, and resuspension of toxic cysts, terns and other seabirds were studied. Monitoring programs were also established for sea urchins and mussels, two important commercial species. Commercial-sized sea urchins showed a decrease of 60 per cent between 1998 and 1999 (i.e. the construction period). Recovery of sea urchin population in the immediate trench region will be the special focus of the post-construction monitoring phase. Mussel spat settlement and mussel tissue condition, lobster trapping, water properties, and bird behaviour showed no measurable changes during construction monitoring. In addition to these studies there is an ongoing offshore monitoring program in effect by Sable Offshore Energy Inc., put in place as a condition of approval of its Development Plan by the Canada-Nova Scotia Offshore Petroleum Board. This program monitors attributes such as water quality, suspended particulate matter in the benthic boundary layer, sediment quality, the benthic habitat and megafaunal community, shellfish body burden and taint, marine mammals and seabirds

  7. ON-Line Monitoring of Instrument Channel Performance: Volume 3: Applications to Nuclear Power Plant Technical Specification Instrumentation

    Energy Technology Data Exchange (ETDEWEB)

    E Davis, B Rasmussen

    2004-12-31

    This report is a guide for a technical specification change submittal and subsequent implementation of on-line monitoring for safety-related applications. This report is the third in a three-volume set. Volume 1, ''Guidelines for Model Development and Implementation'', presents the various tasks that must be completed to prepare models for and to implement an on-line monitoring system.

  8. Technical monitoring and economical assessment of the micro-financed solar program in Bangladesh

    Energy Technology Data Exchange (ETDEWEB)

    Wiese, Rafael [PSE AG, Freiburg (Germany); Steidl, Michael [Micro Service Consult GmbH, Frankenthal (Germany)

    2011-07-01

    The Solar Home System (SHS) dissemination program in Bangladesh is considered to be one of the most successful programs of its kind worldwide. Between 2005 and 2010 nearly 750,000 SHS have been installed, the vast majority is at 50 Wp. Systems have been implemented in rural areas where grid electricity supply is neither available nor envisaged in the mid-term future. Supported by international grants and soft loans, monthly installation rates have increased to over 30,000 SHS. The program management responsibility lies with the Infrastructure Development Company Limited (IDCOL). Around 20 micro-finance institutions (MFI) are responsible for the technical and financial implementation. They provide micro-financing to enable their customers to purchase the SHS. The authors carried out a technical monitoring of more than 5.000 SHS since 2007. In general it was found that nearly all systems are operational and only 7% had technical problems which required immediate repairs to prevent technical failure of the SHS. The main problems in this category were damages to or bypassing of the charge controller. The authors also assessed the financial performance of the MFIs. As a result, measures for credit risk management were introduced which have strengthen the financial performance. (orig.)

  9. CSCW Challenges in Large-Scale Technical Projects - a case study

    DEFF Research Database (Denmark)

    Grønbæk, Kaj; Kyng, Morten; Mogensen, Preben Holst

    1992-01-01

    This paper investigates CSCW aspects of large-scale technical projects based on a case study of a specific Danish engineering company and uncovers s challenges to CSCW applications in this setting. The company is responsible for management and supervision of one of the worlds largest tunnel....... The initial qualitative analysis identified a number of bottlenecks in daily work, where support for cooperation is needed. Examples of bottlenecks are: sharing materials, issuing tasks, and keeping track of task status. Grounded in the analysis, cooperative design workshops based on scenarios of future work...

  10. Hanford Environmental Dose Reconstruction Project monthly report

    International Nuclear Information System (INIS)

    Finch, S.M.

    1991-10-01

    The objective of the Hanford Environmental Dose Reconstruction Project is to estimate the radiation doeses that individuals and populations could have received from nuclear operations at Hanford since 1944. The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed, from release to impact on humans (dose estimates): Source terms; environmental transport; environmental monitoring data; demographics, agriculture, food habits; environmental pathways and dose estimates

  11. Routine Radiological Environmental Monitoring Plan

    International Nuclear Information System (INIS)

    Bechtel Nevada

    1998-01-01

    The U.S. Department of Energy manages the Nevada Test Site in a manner that meets evolving DOE Missions and responds to the concerns of affected and interested individuals and agencies. This Routine Radiological Monitoring Plan addressess complicance with DOE Orders 5400.1 and 5400.5 and other drivers requiring routine effluent monitoring and environmental surveillance on the Nevada Test Site. This monitoring plan, prepared in 1998, addresses the activities conducted onsite NTS under the Final Environmental Impact Statement and Record of Decision. This radiological monitoring plan, prepared on behalf of the Nevada Test Site Landlord, brings together sitewide environmental surveillance; site-specific effluent monitoring; and operational monitoring conducted by various missions, programs, and projects on the NTS. The plan provides an approach to identifying and conducting routine radiological monitoring at the NTS, based on integrated technical, scientific, and regulatory complicance data needs

  12. Virginia Solar Pathways Project Final Technical Report

    Energy Technology Data Exchange (ETDEWEB)

    Bond, Katharine; Cosby, Sarah

    2018-03-28

    This Report provides a technical review of the final results of a funding award to Virginia Electric and Power Company (Dominion Energy Virginia (DEV) or the Company) for a project under the U.S. Department of Energy’s Solar Energy Technologies Office. The three-year project was formally known as the Virginia Solar Pathways Project (VSPP or the Project). The purpose of the VSPP was to develop a collaborative utility-administered solar strategy (Solar Strategy) for DEV’s service territory in the Commonwealth that could serve as a replicable model for other states with similar policy environments. The U.S. Department of Energy (DOE) funding award enabled DEV to take a focused approach to developing the Solar Strategy for its Virginia service territory. The structure and funding from the DOE award also facilitated valuable input from a formal stakeholder team convened to serve as advisors (Advisory Team) to the VSPP and contribute their perspectives and expertise to both the analysis and strategy development aspects of the Project. The development of the Solar Strategy involved three main goals: • Establish a policy and program framework that would integrate existing solar programs with new options appropriate for the Commonwealth’s policy environment and broader economic development objectives; • Promote wider deployment of solar within a low retail electric rate environment; and • Serve as a sustainable, utility-administered solar model that could be replicated in other states with similar policy environments, including, but not limited to, the entire Southeast region. In support of the VSPP goals, the Project Team commissioned four studies to support the Solar Strategy development. Two studies, completed by Navigant Consulting, focused on the integration of solar into the electric grid. The first solar integration study focused on integration of solar into the distribution grid where the utility system directly connects to and serves end-use customers

  13. The Hanford Environmental Dose Reconstruction Project: Overview

    International Nuclear Information System (INIS)

    Haerer, H.A.; Freshley, M.D.; Gilbert, R.O.; Morgan, L.G.; Napier, B.A.; Rhoads, R.E.; Woodruff, R.K.

    1990-01-01

    In 1988, researchers began a multiyear effort to estimate radiation doses that people could have received since 1944 at the U.S. Department of Energy's Hanford Site. The study was prompted by increasing concern about potential health effects to the public from more than 40 yr of nuclear activities. We will provide an overview of the Hanford Environmental Dose Reconstruction Project and its technical approach. The work has required development of new methods and tools for dealing with unique technical and communication challenges. Scientists are using a probabilistic, rather than the more typical deterministic, approach to generate dose distributions rather than single-point estimates. Uncertainties in input parameters are reflected in dose results. Sensitivity analyses are used to optimize project resources and define the project's scope. An independent technical steering panel directs and approves the work in a public forum. Dose estimates are based on review and analysis of historical data related to operations, effluents, and monitoring; determination of important radionuclides; and reconstruction of source terms, environmental conditions that affected transport, concentrations in environmental media, and human elements, such as population distribution, agricultural practices, food consumption patterns, and lifestyles. A companion paper in this volume, The Hanford Environmental Dose Reconstruction Project: Technical Approach, describes the computational framework for the work

  14. Addressing the technical capacity constraints on community-based labour intensive road projects - a case study of the Amadiba road project

    CSIR Research Space (South Africa)

    Lachman, A

    2006-09-01

    Full Text Available effect. 3. AIMS AND OBJECTIVE OF THE PAPER The main aim of this paper is to discuss the technical capacity constraints experienced on the Amadiba Road Project and to outline the measures taken to address them. Some of the objectives of this paper... are to: � Highlight the socioeconomic status of the community � Highlight the capacity needed on the project � Discuss some of the capacity building issues � Highlight the current state of the community 4. SOCIOECONOMIC STATUS OF THE AMADIBA...

  15. Hearth monitoring project annual report for FY-1981

    International Nuclear Information System (INIS)

    Nieschmidt, E.B.; Lawrence, R.S.

    1981-08-01

    Progress during FY 1981 in the Hearth Monitoring project for the Idaho National Engineering Laboratory Transuranic Waste Treatment Facility is reported. Results of calculational, experimental and instrumental phases of the program are presented. Recommendations and plans for continuation of the program are displayed. Schedules for future efforts are included

  16. Final Technical Report - Kotzebue Wind Power Project - Volume II

    Energy Technology Data Exchange (ETDEWEB)

    Rana Zucchi, Global Energy Concepts, LLC; Brad Reeve, Kotzebue Electric Association; DOE Project Officer - Doug Hooker

    2007-10-31

    The Kotzebue Wind Power Project is a joint undertaking of the U.S. Department of Energy (DOE); Kotzebue Electric Association (KEA); and the Alaska Energy Authority (AEA). The goal of the project is to develop, construct, and operate a wind power plant interconnected to a small isolated utility grid in an arctic climate in Northwest Alaska. The primary objective of KEA’s wind energy program is to bring more affordable electricity and jobs to remote Alaskan communities. DOE funding has allowed KEA to develop a multi-faceted approach to meet these objectives that includes wind project planning and development, technology transfer, and community outreach. The first wind turbines were installed in the summer of 1997 and the newest turbines were installed in the spring of 2007. The total installed capacity of the KEA wind power project is 1.16 MW with a total of 17 turbines rated between 65 kW and 100 kW. The operation of the wind power plant has resulted in a wind penetration on the utility system in excess of 35% during periods of low loads. This document and referenced attachments are presented as the final technical report for the U.S. Department of Energy (DOE) grant agreement DE-FG36-97GO10199. Interim deliverables previously submitted are also referenced within this document and where reasonable to do so, specific sections are incorporated in the report or attached as appendices.

  17. Nuclear incident monitor criticality alarm instrument for the Savannah River Site: Technical manual

    International Nuclear Information System (INIS)

    Jenkins, J.B.

    1996-01-01

    The Savannah River Site is a Department of Energy facility. The facility stores, processes, and works with fissionable material at a number of locations. Technical standards and US Department of Energy orders, require these locations to be monitored by criticality alarm systems under certain circumstances. The Savannah River Site calls such instruments Nuclear Incident Monitors or NIMs. The Sole purpose of the Nuclear Incident Monitor is to provide an immediate evacuation signal in the case of an accidental criticality in order to minimize personnel exposure to radiation. The new unit is the third generation Nuclear Incident Monitor at the Savannah River Site. The second generation unit was developed in 1979. It was designed to eliminate vacuum-tube circuits, and was the first solid state NIM at SRS. The major design objectives of the second generation NIM were to improve reliability and reduce maintenance costs. Ten prototype units have been built and tested. This report describes the design of the new NIM and the testing that took place to verify its acceptability

  18. Remote monitoring in international safeguards

    International Nuclear Information System (INIS)

    Dupree, S.A.; Sonnier, C.S.; Johnson, C.S.

    1996-01-01

    In recent years, technology that permits the integration of monitoring sensors and instruments into a coherent network has become available. Such integrated monitoring systems provide a means for the automatic collection and assessment of sensor signals and instrument readings and for processing such signals and readings in near real time. To gain experience with the new monitoring system technology, the US Department of energy, through bilateral agreements with its international partners, has initiated a project to emplace demonstration systems in various nuclear facilities and conduct field trials of the technology. This effort is the International Remote Monitoring Project. Under this project, remote monitoring systems are being deployed around the world in an incremental manner. Each deployment is different and each offers lessons for improving the performance and flexibility of the technology. Few problems were encountered with the operation of the installations to date, and much has been learned about the operation and use of the new technology. In the future, the authors believe systems for safeguards applications should be capable of being monitored remotely, emphasize the use of sensors, and utilize selective triggering for recording of images. Remote monitoring across national borders can occur only in the context of a cooperative, nonadversarial implementation regime. However, significant technical and policy work remains to be done before widespread safeguards implementation of remote monitoring should be considered. This paper shows that an abundance of technology supports the implementation of integrated and remote monitoring systems. Current field trials of remote monitoring systems are providing practical data and operational experience to aid in the design of tomorrow's systems

  19. Project characteristics monitoring report: BWIP (Basalt Waste Isolation Program) repository project

    Energy Technology Data Exchange (ETDEWEB)

    Friedli, E.A.; Herborn, D.I.; Taylor, C.D.; Tomlinson, K.M.

    1988-03-01

    This monitoring report has been prepared to show compliance with provisions of the Nuclear Waste Policy Act of 1982 (NWPA) and to provide local and state government agencies with information concerning the Basalt Waste Isolation Program (BWIP). This report contains data for the time period May 26, 1986 to February 1988. The data include employment figures, salaries, project purchases, taxes and fees paid, worker survey results, and project closedown personal interview summaries. This information has become particularly important since the decision in December 1987 to stop all BWIP activities except those for site reclamation. The Nuclear Waste Policy Amendments Act of 1987 requires nonreclamation work at the Hanford Site to stop as of March 22, 1988. 7 refs., 6 figs., 28 tabs.

  20. Project characteristics monitoring report: BWIP [Basalt Waste Isolation Program] repository project

    International Nuclear Information System (INIS)

    Friedli, E.A.; Herborn, D.I.; Taylor, C.D.; Tomlinson, K.M.

    1988-03-01

    This monitoring report has been prepared to show compliance with provisions of the Nuclear Waste Policy Act of 1982 (NWPA) and to provide local and state government agencies with information concerning the Basalt Waste Isolation Program (BWIP). This report contains data for the time period May 26, 1986 to February 1988. The data include employment figures, salaries, project purchases, taxes and fees paid, worker survey results, and project closedown personal interview summaries. This information has become particularly important since the decision in December 1987 to stop all BWIP activities except those for site reclamation. The Nuclear Waste Policy Amendments Act of 1987 requires nonreclamation work at the Hanford Site to stop as of March 22, 1988. 7 refs., 6 figs., 28 tabs

  1. Final Technical Report. Project Boeing SGS

    Energy Technology Data Exchange (ETDEWEB)

    Bell, Thomas E. [The Boeing Company, Seattle, WA (United States)

    2014-12-31

    Boeing and its partner, PJM Interconnection, teamed to bring advanced “defense-grade” technologies for cyber security to the US regional power grid through demonstration in PJM’s energy management environment. Under this cooperative project with the Department of Energy, Boeing and PJM have developed and demonstrated a host of technologies specifically tailored to the needs of PJM and the electric sector as a whole. The team has demonstrated to the energy industry a combination of processes, techniques and technologies that have been successfully implemented in the commercial, defense, and intelligence communities to identify, mitigate and continuously monitor the cyber security of critical systems. Guided by the results of a Cyber Security Risk-Based Assessment completed in Phase I, the Boeing-PJM team has completed multiple iterations through the Phase II Development and Phase III Deployment phases. Multiple cyber security solutions have been completed across a variety of controls including: Application Security, Enhanced Malware Detection, Security Incident and Event Management (SIEM) Optimization, Continuous Vulnerability Monitoring, SCADA Monitoring/Intrusion Detection, Operational Resiliency, Cyber Range simulations and hands on cyber security personnel training. All of the developed and demonstrated solutions are suitable for replication across the electric sector and/or the energy sector as a whole. Benefits identified include; Improved malware and intrusion detection capability on critical SCADA networks including behavioral-based alerts resulting in improved zero-day threat protection; Improved Security Incident and Event Management system resulting in better threat visibility, thus increasing the likelihood of detecting a serious event; Improved malware detection and zero-day threat response capability; Improved ability to systematically evaluate and secure in house and vendor sourced software applications; Improved ability to continuously monitor

  2. Legal control of technical large-scale projects

    International Nuclear Information System (INIS)

    Kuhnt, D.

    1981-01-01

    The principle derived from experience that large projects require approval by the courts may not longer be valid. On the contrary, the courts are only entitled to real legal control according to the principle of the division of powers. If not accurately defined legal terms cannot be waived, the administration has to set the frame for review by courts by technical standards to be given in statutory ordinances, administrative provisions and administrative instructions. The average term of administrative proceedings has to be shortened considerably. The plaintiff as well as the beneficiaries of the act of licensing have a right to a prompt decision. The immediate execution of a decision can, on principle, also not be waived in future. More than up to now, the careful consideration of the interests and not an anticipated judgement on the main issue has to be the subject of legal examination according to section 80, subsection 5 of the German code of administrative procedure (Verwaltungsgerichtsordnung). (orig./HP) [de

  3. Goals and activities of the JICA technical cooperation project on reduction of seismic risk in Romania

    International Nuclear Information System (INIS)

    Vacareanu, R.; Kato, H.

    2007-01-01

    Japan International Cooperation Agency (JICA) Technical Cooperation Project on Reduction of Seismic Risk for Buildings and Structures started in Romania on October 1, 2002. The aim of the Project is to strengthen the capacity of earthquake disaster related activities in Romania. The Project approval is the result of four years of intensive efforts made by professionals from Technical University of Civil Engineering Bucharest (UTCB), Ministry of Transport, Constructions and Tourism (MTCT), Romania, National Building Research Institute (INCERC) Bucharest, JICA, Building Research Institute (BRI), Tsukuba, and National Institute for Land, Infrastructure and Management (NILIM), Tsukuba, Japan. The duration of the Project is five years. The implementing agency is the National Center for Seismic Risk Reduction (NCSRR) as a public institution of national interest under MTCT. The activities are carried out by NCSRR in partnership with UTCB and INCERC. During the Project period, 29 young Romanian engineers were trained in Japan, 7 Japanese experts and 37 Japanese experts worked for long-term and short-term, respectively in Romania. Equipment for seismic instrumentation, dynamic characterization of soil and structural testing rising up approximately to 260 million yens (i.e. 2.17 million USD) were donated by JICA to Romania, through NCSRR. The total cost of the Project is roughly 7 million USD. The paper describes the main activities and results of the Project until the JICA Final Evaluation Mission (March 2007). (authors)

  4. Monitoring of Space and Earth electromagnetic environment by MAGDAS project: Collaboration with IKIR - Introduction to ICSWSE/MAGDAS project

    Directory of Open Access Journals (Sweden)

    Yoshikawa Akimasa

    2017-01-01

    Full Text Available For study of coupling processes in the Solar-Terrestrial System, International Center for Space Weather Science and Education (ICSWSE, Kyushu University has developed a real time magnetic data acquisition system (the MAGDAS project around the world. The number of observational sites is increasing every year with the collaboration of host countries. Now at this time, the MAGDAS Project has installed 78 real time magnetometers – so it is the largest magnetometer array in the world. The history of global observation at Kyushu University is over 30 years and number of developed observational sites is over 140. Especially, Collaboration between IKIR is extended back to 1990's. Now a time, we are operating Flux-gate magnetometer and FM-CW Radar. It is one of most important collaboration for space weather monitoring. By using MAGDAS data, ICSWSE produces many types of space weather index, such as EE-index (for monitoring long tern and shot term variation of equatorial electrojet, Pc5 index (for monitoring solar-wind velocity and high energy electron flux, Sq-index (for monitoring global change of ionospheric low and middle latitudinal current system, and Pc3 index (for monitoring of plasma density variation at low latitudes. In this report, we will introduce recent development of MAGDAS/ICSWSE Indexes project and topics for new open policy for MAGDAS data will be also discussed.

  5. Monitoring of Space and Earth electromagnetic environment by MAGDAS project: Collaboration with IKIR - Introduction to ICSWSE/MAGDAS project

    Science.gov (United States)

    Yoshikawa, Akimasa; Fujimoto, Akiko; Ikeda, Akihiro; Uozumi, Teiji; Abe, Shuji

    2017-10-01

    For study of coupling processes in the Solar-Terrestrial System, International Center for Space Weather Science and Education (ICSWSE), Kyushu University has developed a real time magnetic data acquisition system (the MAGDAS project) around the world. The number of observational sites is increasing every year with the collaboration of host countries. Now at this time, the MAGDAS Project has installed 78 real time magnetometers - so it is the largest magnetometer array in the world. The history of global observation at Kyushu University is over 30 years and number of developed observational sites is over 140. Especially, Collaboration between IKIR is extended back to 1990's. Now a time, we are operating Flux-gate magnetometer and FM-CW Radar. It is one of most important collaboration for space weather monitoring. By using MAGDAS data, ICSWSE produces many types of space weather index, such as EE-index (for monitoring long tern and shot term variation of equatorial electrojet), Pc5 index (for monitoring solar-wind velocity and high energy electron flux), Sq-index (for monitoring global change of ionospheric low and middle latitudinal current system), and Pc3 index (for monitoring of plasma density variation at low latitudes). In this report, we will introduce recent development of MAGDAS/ICSWSE Indexes project and topics for new open policy for MAGDAS data will be also discussed.

  6. Final Scientific/Technical Report for project “Geomechanical Monitoring for CO2 Hub Storage: Production and Injection at Kevin Dome

    Energy Technology Data Exchange (ETDEWEB)

    Daley, Thomas M. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Vasco, Don [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Ajo-Franklin, Jonathan [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Dobeck, Laura [Montana State Univ., Bozeman, MT (United States); Spangler, Lee [Montana State Univ., Bozeman, MT (United States); Leonti, Michelle [Montana State Univ., Bozeman, MT (United States)

    2017-06-27

    After learning that the TDS value in the target injection formation at the Kevin Dome site is too low to qualify for an EPA Class VI CO2 injection permit, the BSCSP project was re-scoped such that injection of CO2 is no longer planned. With no injection planned, the Geomechanics project was closed. In this final report, we describe the objective and approach of the project as proposed, and the limited results obtained before stopping work. The objective of the proposed research was the development & validation of an integrated monitoring approach for quantifying the interactions between large-scale geological carbon storage (GCS) and subsurface geomechanical state, particularly perturbations relevant to reservoir integrity such as fault reactivation and induced fracturing. In the short period of work before knowing the fate of the Kevin Dome project, we (1) researched designs for both the proposed InSAR corner reflectors as well as the near-surface 3C seismic stations; (2) developed preliminary elastic geomechanical models; (3) developed a second generation deformation prediction for the BSCSP Kevin Dome injection site; and (4) completed a preliminary map of InSAR monuments and shallow MEQ wells in the vicinity of the BSCSP injection pad.

  7. Scintilla European project, the successful research results

    Energy Technology Data Exchange (ETDEWEB)

    Sannie, G.; Kondrasov, V.; Corre, G.; Boudergui, K.; Perot, B.; Carasco, C.; Montemont, G. [Commissariat a l' energie atomique et aux energies alternatives, Saclay, Cadarache, Grenoble (France); Peerani, P.; Carrapico, C.; Tomanin, A.; Rosas, F.; Caviglia, M.; Eklund, G.; Tagziria, H. [European Commission, Joint Research Centre, ITU, Nuclear Security Unit, Ispra (Italy); Friedrich, H.; Chmel, S. [Fraunhofer-Institut fuer Naturwissenschaftlich - Technische Trendanalysen - INT, Euskirchen (Germany); De Vita, R.; Manchini, E.; Pavan, M. [Istituto Nazionale di Fisica Nucleare, Sezione di Genova, Genova (Italy); Grattarola, M.; Botta, E. [Ansaldo Nucleare S.P.A, Genova (Italy); Kovacs, A.; Lakosi, L. [Hungarian Academy of Sciences, Centre for Energy Research, Budapest (Hungary); Baumhauer, C.; Deheuninck, T.; Haddad, E. [ARTTIC, Paris (France); Petrossian, G.; Ferragut, A. [SAPHYMO, Massy (France); Dermody, G.; Crossingham, G. [Symetrica Security Ltd, Southampton (United Kingdom)

    2015-07-01

    The Scintilla FP7 project is ended in December 2014, the fruitful results of 3 years development and tests will be presented. SCINTILLA offers the capacity to finding a reliable alternative to Helium-3 based detection systems since the gas which is predominantly used in nuclear safeguards and security applications has now become very expensive, rare and nearly unavailable. SCINTILLA benchmarks results are based on international standards. Radiation Portal tests were carried out at the Joint Research Centre (JRC) in Ispra (Italy). The scintilla project addresses few mains issues. The first is to develop neutron detectors for Radiation Portal Monitor (RPM) and the second is the need of new wearable integrated solutions for Spectrometric Personal Radiation Monitor (SPRM). The partners which provide technical systems of the scintilla project are INFN-ANSALDO, CEA, SYMETRICA and SAPHYMO. For RPM, the objective is to find reliable alternatives to Helium-3 historical neutron detector and provide technical solutions which cope with tests for reliable mobile and cost effective. For Spectrometric Personal Radiation Monitor (SPRM), SCINTILLA is innovating in technology areas that offer complementary capabilities for detecting and identifying gamma, Two CZT (Cadmium Zinc Telluride) addressing contexts of used by first responder technologies, one is a wearable detector and the second is a gamma camera complemented by advanced image processing technologies. (authors)

  8. Technical issues in licensing low-level radioactive waste facilities

    Energy Technology Data Exchange (ETDEWEB)

    Junkert, R. [California Dept. of Health Services, CA (United States)

    1993-03-01

    The California Department of Health Service spent two years in the review of an application for a low-level radioactive waste disposal facility in California. During this review period a variety of technical issues had to be evaluated and resolved. One of the first issues was the applicability and use of NRC guidance documents for the development of LLW disposal facilities. Other technical issues that required intensive evaluations included surface water hydrology, seismic investigation, field and numerical analysis of the unsaturated zone, including a water infiltration test. Source term verification became an issue because of one specific isotope that comprised more than 90% of the curies projected for disposal during the operational period. The use of trench liners and the proposed monitoring of the unsaturated zone were reviewed by a highly select panel of experts to provide guidance on the need for liners and to ensure that the monitoring system was capable of monitoring sufficient representative areas for radionuclides in the soil, soil gas, and soil moisture. Finally, concerns about the quality of the preoperational environmental monitoring program, including data, sample collection procedures, laboratory analysis, data review and interpretation and duration of monitoring caused a significant delay in completing the licensing review.

  9. The Umatilla Basin Natural Production Monitoring and Evaluation Project, 2008 Annual Progress Report.

    Energy Technology Data Exchange (ETDEWEB)

    Contor, Craig R.; Harris, Robin; King, Marty [Confederated Tribes of the Umatilla Indian Reservation

    2009-06-10

    The Umatilla Basin Natural Production Monitoring and Evaluation Project (UBNPMEP) is funded by Bonneville Power Administration (BPA) as directed by section 4(h) of the Pacific Northwest Electric Power Planning and Conservation Act of 1980 (P.L.96-501). This project is in accordance with and pursuant to measures 4.2A, 4.3C.1, 7.1A.2, 7.1C.3, 7.1C.4 and 7.1D.2 of the Northwest Power Planning Council's (NPPC) Columbia River Basin Fish and Wildlife Program (NPPC 1994). Work was conducted by the Fisheries Program of the Confederated Tribes of the Umatilla Indian Reservation (CTUIR). The UBNPMEP is coordinated with two Oregon Department of Fish and Wildlife (ODFW) research projects that also monitor and evaluate the success of the Umatilla Fisheries Restoration Plan. This project deals with the natural production component of the plan, and the ODFW projects evaluate hatchery operations (project No. 1990-005-00, Umatilla Hatchery M & E) and smolt outmigration (project No. 1989-024-01, Evaluation of Juvenile Salmonid Outmigration and Survival in the Lower Umatilla River). Collectively these three projects monitor and evaluate natural and hatchery salmonid production in the Umatilla River Basin. The need for natural production monitoring has been identified in multiple planning documents including Wy-Kan-Ush-Mi Wa-Kish-Wit Volume I, 5b-13 (CRITFC 1996), the Umatilla Hatchery Master Plan (CTUIR & ODFW 1990), the Umatilla Basin Annual Operation Plan, the Umatilla Subbasin Summary (CTUIR & ODFW 2001), the Subbasin Plan (CTUIR & ODFW 2004), and the Comprehensive Research, Monitoring, and Evaluation Plan (CTUIR and ODFW 2006). Natural production monitoring and evaluation is also consistent with Section III, Basinwide Provisions, Strategy 9 of the 2000 Columbia River Basin Fish and Wildlife Program (NPPC 1994, NPCC 2004). The Umatilla Basin M&E plan developed along with efforts to restore natural populations of spring and fall Chinook salmon, (Oncorhynchus tshawytsha), coho

  10. Guidelines for the environmental impact statement for the proposed Great Whale River Hydroelectric Project. Backgorund information

    International Nuclear Information System (INIS)

    1992-09-01

    The guidelines presented on the preparation of the environmental impact statement for the Great Whale hydroelectric project by Hydro-Quebec stipulated a project justification, description of the biophysical and social environments, a project description, and that the assessment must address project impacts, mitigative and compensatory measures, environmental surveillance, monitoring, and long-term management programs. Background information presented in this document provides technical notes on the guidelines and the environmental assessment process, a glossary of terms, and biographical notes. The technical notes address guideline structure, project justification, native knowledge, evaluation issues, cumulative impacts, and the assessment and review process

  11. Intercomparison for individual monitoring of external exposure from photon radiation. Results of a co-ordinated research project 1996-1998

    International Nuclear Information System (INIS)

    1999-12-01

    This TECDOC presents the results of a Co-ordinated Research Project on Intercomparison for Individual Monitoring of External Exposure from photon radiation. The International Basic Safety Standards for Protection against Ionizing Radiation and for the Safety of Radiation Sources (BSS) have endorsed the use of the operational quantities for monitoring purposes. Specifically, personal dose equivalent, H p (d), is to be used for individual dosimetry to demonstrate compliance with the exposure limit recommendations, while for workplace area monitoring the ambient dose equivalent and the directional dose equivalent are recommended. In view of the technical difficulties associated with the introduction of these operational quantities the IAEA decided to assist Member States in their provision of appropriate dosimetry for occupational protection. In this respect, intercomparisons have proven to be a cost effective method of providing such support. A Co-ordinated Research Project (CRP) was started in 1997 on Intercomparison for Individual Monitoring of External Exposure from photon radiation, involving more than twenty laboratories from eastern Europe and the countries of the former Soviet Union, and focusing on personnel dosimetry services for nuclear power plants. This CRP was part of the activities of the IAEA Occupational Protection Programme, the objective4s of which are to promote and internationally harmonized approach for optimizing occupational radiation protection through: the development of guides, within the IAEA activities for establishing standards for radiation protection, for restricting radiation exposures in the workplace and for applying current occupational radiation protection techniques, and the promotion of the application of these guidelines. The preparatory phase included, in May 1997, a workshop aimed at familiarizing the participants with the new operational quantities

  12. Project W-420 Stack Monitoring system upgrades conceptual design report

    International Nuclear Information System (INIS)

    TUCK, J.A.

    1998-01-01

    This document describes the scope, justification, conceptual design, and performance of Project W-420 stack monitoring system upgrades on six NESHAP-designated, Hanford Tank Farms ventilation exhaust stacks

  13. Project W-420 Stack Monitoring system upgrades conceptual design report

    Energy Technology Data Exchange (ETDEWEB)

    TUCK, J.A.

    1998-11-06

    This document describes the scope, justification, conceptual design, and performance of Project W-420 stack monitoring system upgrades on six NESHAP-designated, Hanford Tank Farms ventilation exhaust stacks.

  14. Technical project of complex fast cycle heat treatment of hydrogenous coal preparation

    OpenAIRE

    Moiseev, V. A.; Andrienko, V. G.; Pileckij, V. G.; Urvancev, A. I.; Gvozdyakov, Dmitry Vasilievich; Gubin, Vladimir Evgenievich; Matveev, Aleksandr Sergeevich; Savostiyanova, Ludmila Viktorovna

    2015-01-01

    Problems of heat-treated milled hydrogenous coal preparation site creation in leading fast cycle heat treatment complex were considered. Conditions for effective use of electrostatic methods of heat-treated milled hydrogenous coal preparation were set. Technical project of heat treatment of milled hydrogenous coal preparation site was developed including coupling of working equipment complex on fast heat treatment and experimental samples of equipment being designed for manufacturing. It was ...

  15. Technical approach to groundwater restoration

    International Nuclear Information System (INIS)

    1993-01-01

    The Technical Approach to Groundwater Restoration (TAGR) provides general technical guidance to implement the groundwater restoration phase of the Uranium Mill Tailings Remedial Action (UMTRA) Project. The TAGR includes a brief overview of the surface remediation and groundwater restoration phases of the UMTRA Project and describes the regulatory requirements, the National Environmental Policy Act (NEPA) process, and regulatory compliance. A section on program strategy discusses program optimization, the role of risk assessment, the observational approach, strategies for meeting groundwater cleanup standards, and remedial action decision-making. A section on data requirements for groundwater restoration evaluates the data quality objectives (DQO) and minimum data required to implement the options and comply with the standards. A section on sits implementation explores the development of a conceptual site model, approaches to site characterization, development of remedial action alternatives, selection of the groundwater restoration method, and remedial design and implementation in the context of site-specific documentation in the site observational work plan (SOWP) and the remedial action plan (RAP). Finally, the TAGR elaborates on groundwater monitoring necessary to evaluate compliance with the groundwater cleanup standards and protection of human health and the environment, and outlines licensing procedures

  16. Systems approach for design control at Monitored Retrievable Storage Project

    International Nuclear Information System (INIS)

    Kumar, P.N.; Williams, J.R.

    1994-01-01

    This paper describes the systems approach in establishing design control for the Monitored Retrievable Storage Project design development. Key elements in design control are enumerated and systems engineering aspects are detailed. Application of lessons learned from the Yucca Mountain Project experience is addressed. An integrated approach combining quality assurance and systems engineering requirements is suggested to practice effective design control

  17. Development of Nano-crystalline Doped-Ceramic Enabled Fiber Sensors for High Temperature In-Situ Monitoring of Fossil Fuel Gases

    Energy Technology Data Exchange (ETDEWEB)

    Xiao, Hai [Missouri Univ. of Science and Technology, Rolla, MO (United States); Dong, Junhang [Univ. of Cincinnati, OH (United States); Lin, Jerry [Arizona State Univ., Tempe, AZ (United States); Romero, Van [New Mexico Institute of Mining and Technology, Socorro, NM (United States)

    2012-03-01

    This is a final technical report for the first project year from July 1, 2005 to Jan 31, 2012 for DoE/NETL funded project DE-FC26-05NT42439: Development of Nanocrystalline Doped-Ceramic Enabled Fiber Sensors for High Temperature In-Situ Monitoring of Fossil Fuel Gases. This report summarizes the technical progresses and achievements towards the development of novel nanocrystalline doped ceramic material-enabled optical fiber sensors for in situ and real time monitoring the gas composition of flue or hot gas streams involved in fossil-fuel based power generation and hydrogen production.

  18. Teaching Power Electronics with a Design-Oriented, Project-Based Learning Method at the Technical University of Denmark

    Science.gov (United States)

    Zhang, Zhe; Hansen, Claus Thorp; Andersen, Michael A. E.

    2016-01-01

    Power electronics is a fast-developing technology within the electrical engineering field. This paper presents the results and experiences gained from applying design-oriented project-based learning to switch-mode power supply design in a power electronics course at the Technical University of Denmark (DTU). Project-based learning (PBL) is known…

  19. Human Factors Analysis of Pipeline Monitoring and Control Operations: Final Technical Report

    Science.gov (United States)

    2008-11-26

    The purpose of the Human Factors Analysis of Pipeline Monitoring and Control Operations project was to develop procedures that could be used by liquid pipeline operators to assess and manage the human factors risks in their control rooms that may adv...

  20. EGNOS Monitoring Prepared in Space Research Centre P.A.S. for SPMS Project

    Science.gov (United States)

    Swiatek, Anna; Jaworski, Leszek; Tomasik, Lukasz

    2017-12-01

    The European Geostationary Overlay Service (EGNOS) augments Global Positioning System (GPS) by providing correction data and integrity information for improving positioning over Europe. EGNOS Service Performance Monitoring Support (SPMS) project has assumed establishment, maintenance and implementation of an EGNOS performance monitoring network. The paper presents preliminary results of analyses prepared in Space Research Centre, Polish Academy of Sciences (Warsaw), as one of partners in SPMS project.

  1. DEVELOPING AND IMPLEMENTING AN ESTUARINE WATER QUALITY MONITORING, ASSESSMENT AND OUTREACH PROGRAM/THE MYSOUND PROJECT

    Science.gov (United States)

    EPA has developed a technology transfer handbook for the EMPACT MYSound Project. The handbook highlights information and monitoring technologies developed from the EMPACT Long Island Sound Marine Monitoring (MYSound) Project. As part of the MYSound effort, telemetering data-buoys...

  2. Yucca Mountain Site Characterization Project: Technical Data Catalog (quarterly supplement), June 30, 1994

    International Nuclear Information System (INIS)

    1994-01-01

    The DOE/NRC Site-Specific Procedural Agreement for Geologic Repository Site Investigation and Characterization Program requires the DOE to develop and maintain a catalog of data which will be updated and provided to the NRC at least quarterly. This catalog is to include a description of the data; the date, place, and method of acquisition; and where it may be examined. The Yucca Mountain Site Characterization Project (YMP) Technical Data Catalog is published and distributed in accordance with the requirements of the Site-Specific Agreement. The YMP Technical Data Catalog is a report based on reference information contained in the YMP Automated Technical Data Tracking System (ATDT). The reference information is provided by Participants for data acquired or developed in support of the YMP. The Technical Data Catalog is updated quarterly and published in the month following the end of each quarter. A complete revision to the catalog is published at the end of each fiscal year. Supplements to the end-of-year edition are published each quarter. These supplements provide information related to new data items not included in previous quarterly updates and data items affected by changes to previously published reference information. The Technical Data Catalog, dated September 30, 1993, should be retained as the baseline document for the supplements until the end-of-year revision is published and distributed in October 1994

  3. The database system for the management of technical documentations of PWR fuel design project using CD-ROM

    International Nuclear Information System (INIS)

    Park, Bong Sik; Lee, Won Jae; Ryu, Jae Kwon; Jo, In Hang; Chang, Jong Hwa.

    1996-12-01

    In this report, the database system developed for the management of technical documentation of PWR fuel design project using CD-ROM (compact disk - read only memory) is described. The database system, KIRDOCM (KAERI Initial and Reload Fuel project technical documentation management), is developed and installed on PC using Visual Foxpro 3.0. Descriptions are focused on the user interface of the KIRDOCM. Introduction addresses the background and concept of the development. The main chapter describes the user requirements, the analysis of computing environment, the design of KIRDOCM, the implementation of the KIRDOCM, user's manual of KIRDOCM and the maintenance of the KIRDOCM for future improvement. The implementation of KIRDOCM system provides the efficiency in the management, maintenance and indexing of the technical documents. And, it is expected that KIRDOCM may be a good reference in applying Visual Foxpro for the development of information management system. (author). 2 tabs., 13 figs., 8 refs

  4. The technical and economical optimization of the French geological repository project - 59275

    International Nuclear Information System (INIS)

    Raffard, Rodolphe; Labalette, Thibaud

    2012-01-01

    Document available in abstract form only. Full text of publication follows: The French Act of 28 June 2006 made the choice of reversible geological repository for long term management of high level and long-lived intermediate level waste. Andra is in charge of designing, building and operating the future industrial repository Cigeo. Current major issues consist in preparing the application to be examined in 2015, planning the construction so that operation would start in 2025 and optimizing the design on both technical and economical points of view. The Dossier 2005 -provided by Andra prior to the 2006 Act- established the feasibility of the project, especially towards compliance with safety and reversibility. Design options were presented at that time with the objective of demonstrating feasibility without ruling out possibilities of further optimization. Along with the scientific and technical review of Dossier 2005, a number of design optimization topics were identified in 2006. Working groups involved Andra's specialists as well as external experts. A particular attention was given to (i) the industrial experience of waste producers and (ii) the characteristics of the clay layer investigated in the Meuse/Haute-Marne Underground Research Laboratory. The 2006 optimization topics were prioritized taking into account their economical impact and the development plan of the project

  5. Flood effects on an Alaskan stream restoration project: the value of long-term monitoring

    Science.gov (United States)

    Densmore, Roseann V.; Karle, Kenneth F.

    2009-01-01

    On a nationwide basis, few stream restoration projects have long-term programs in place to monitor the effects of floods on channel and floodplain configuration and floodplain vegetation, but long-term and event-based monitoring is required to measure the effects of these stochastic events and to use the knowledge for adaptive management and the design of future projects. This paper describes a long-term monitoring effort (15 years) on a stream restoration project in Glen Creek in Denali National Park and Preserve in Alaska. The stream channel and floodplain of Glen Creek had been severely degraded over a period of 80 years by placer mining for gold, which left many reaches with unstable and incised streambeds without functioning vegetated floodplains. The objectives of the original project, initiated in 1991, were to develop and test methods for the hydraulic design of channel and floodplain morphology and for floodplain stabilization and riparian habitat recovery, and to conduct research and monitoring to provide information for future projects in similar degraded watersheds. Monitoring methods included surveyed stream cross-sections, vegetation plots, and aerial, ground, and satellite photos. In this paper we address the immediate and outlying effects of a 25-year flood on the stream and floodplain geometry and riparian vegetation. The long-term monitoring revealed that significant channel widening occurred following the flood, likely caused by excessive upstream sediment loading and the fairly slow development of floodplain vegetation in this climate. Our results illustrated design flaws, particularly in regard to identification and analysis of sediment sources and the dominant processes of channel adjustment.

  6. THE PROFESSIONAL QUALIFICATION SOLIDARY EXTENSION PROJECT AT ELECTRONICS: TECHNICAL AUXILIAR

    Directory of Open Access Journals (Sweden)

    Glaucio Lopes Ramos

    2009-10-01

    Full Text Available This paper has the objective to present the extension course “professional qualification solidary extension project at electronics: technical auxiliar” in the Electrical Engineering course in the University Center of Belo Horizonte, as a professional qualification activity that make possible to young, adults and elderly people from poor communities the social inclusion and an opportunity to improve their access to the labor market. The course is part of extension program of Uni-BH, UniTrabalho e Renda, that is offered since 2006. The responsible for the course are professors and students of the Electrical Engineering course, and an electricity project is also offered. This paper presents the results of an evaluation that is made for the students at the beginning and at the end of the course and showed that the concepts had been assimilated by the students and the expectation of them related to the insertion at labor market is also improved.

  7. Project monitoring and evaluation: an enhancing method for health research system management.

    Science.gov (United States)

    Djalalinia, Shirin; Owlia, Parviz; Malekafzali, Hossein; Ghanei, Mostafa; Babamahmoodi, Abdolreza; Peykari, Niloofar

    2014-04-01

    Planning, organizing, staffing, leading and monitoring are the basic functional component of management. In present article, we aim to define the project monitoring and evaluation in health research system (HRS) considering its success and challenges based on our national experience. IN THIS STUDY BASED ON THE INFORMATION OF ANNUAL MEDICAL SCIENCE UNIVERSITIES EVALUATION DURING THE LAST DECADE THE HRS INDICATORS HAVE BEEN SCORED IN THREE AXES BASED ON HRS FUNCTIONS: Stewardship, capacity building and knowledge production. In this article, we will focus on the results of HRS evaluation from 2002 to 2010, also on its success and challenges. In an overall view, the main results are the experiences of the designing and implantation of such process after pre-project preparation, all parts followed under the whole supervision of the aims of the HRS evaluation. Project management light the way of practical application of knowledge, skills, tools and techniques for better HRS evaluation and management. We concluded that; although monitoring and evaluation as an essential part of HRS Management light the improvement ahead way but we still need to advantage of the new project management advances.

  8. Monitoring of ocean storage projects

    Energy Technology Data Exchange (ETDEWEB)

    Caldeira, K. [Energy and Environment Directorate, Lawrence Livermore National Laboratory, Livermore, CA (United States)

    2003-02-01

    It has been proposed that atmospheric CO2 accumulation could be slowed by capture of CO2 from point sources and subsequent storage of that CO2 in the ocean. If applied, such sequestration efforts would need to be monitored for compliance, effectiveness, and unintended consequences. Aboveground inspection and monitoring of facilities and practices, combined with ocean observations, could assure compliance with ocean sequestration guidelines and regulations. Ocean observations could be made using a variety of sensors mounted on moorings or underwater gliders. Long-term effectiveness and leakage to the atmosphere must be estimated from models, since on large spatial scales it will be impossible to observationally distinguish carbon stored by a project from variable concentrations of background carbon. Furthermore, the ocean naturally would absorb roughly 80% of fossil fuel CO2 released to the atmosphere within a millennium. This means that most of the CO2 sequestered in the ocean that leaks out to the atmosphere will be reabsorbed by the ocean. However, there is no observational way to distinguish remaining carbon from reabsorbed carbon. The science of monitoring unintended consequences in the deep ocean interior is at a primitive state. Little is understood about ecosystems of the deep ocean interior; and even less is understood about how those ecosystems would respond to added CO2. High priority research objectives should be (1) to improve our understanding of the natural ecosystems of the deep ocean, and (2) to improve our understanding of the response of these ecosystems to increased oceanic CO2 concentrations and decreased ocean pH.

  9. Assessment of tobramycin RIA for drug monitoring and dosage regimen. Comparison with other assay technics

    International Nuclear Information System (INIS)

    Takahashi, S.; Shinozaki, K.; Tsujino, D.; Ohhara, H.; Tanaka, Y.; Arai, S.; Someya, K.; Sasaki, Y.

    1983-01-01

    Because of wide range of inter-individual difference of pharmacokinetic parameter, importance of monitoring blood concentration of aminoglycoside antibiotics in each patient has been recognized. With the purpose to use for monitoring of serum tobramycin (TOB) levels and for adequate dosage regimen RIA of TOB was evaluated in comparison with other assay technics. Gamma Coat TOB RIA kits (Clinical Assay-Travenol Japan) were used for RIA of TOB. The TOB concentrations in the same samples were also measured by two kinds of enzyme immunoassay (EIA) (EMIT EIA and SLFIA EIA), High Performance Liquid Chromatography (HPLC) and bioassay (BA). RIA of TOB is a useful assay method with high sensitivity and reasonably good precision to be used for drug monitoring and adequate dosage regimen. Modification of the method for rapid assay of a small number of samples will increase the clinical usefulness in individualized drug monitoring

  10. Using Model-Based Systems Engineering To Provide Artifacts for NASA Project Life-Cycle and Technical Reviews

    Science.gov (United States)

    Parrott, Edith L.; Weiland, Karen J.

    2017-01-01

    The ability of systems engineers to use model-based systems engineering (MBSE) to generate self-consistent, up-to-date systems engineering products for project life-cycle and technical reviews is an important aspect for the continued and accelerated acceptance of MBSE. Currently, many review products are generated using labor-intensive, error-prone approaches based on documents, spreadsheets, and chart sets; a promised benefit of MBSE is that users will experience reductions in inconsistencies and errors. This work examines features of SysML that can be used to generate systems engineering products. Model elements, relationships, tables, and diagrams are identified for a large number of the typical systems engineering artifacts. A SysML system model can contain and generate most systems engineering products to a significant extent and this paper provides a guide on how to use MBSE to generate products for project life-cycle and technical reviews. The use of MBSE can reduce the schedule impact usually experienced for review preparation, as in many cases the review products can be auto-generated directly from the system model. These approaches are useful to systems engineers, project managers, review board members, and other key project stakeholders.

  11. Mechatronics in monitoring, simulation, and diagnostics of industrial and biological processes

    Science.gov (United States)

    Golnik, Natalia; Dobosz, Marek; Jakubowska, Małgorzata; Kościelny, Jan M.; Kujawińska, Małgorzata; Pałko, Tadeusz; Putz, Barbara; Sitnik, Robert; Wnuk, Paweł; Woźniak, Adam

    2013-10-01

    The paper describes a number of research projects of the Faculty of Mechatronics of Warsaw University of Technology in order to illustrate the use of common mechatronics and optomechatronics approach in solving multidisciplinary technical problems. Projects on sensors development, measurement and industrial control systems, multimodal data capture and advance systems for monitoring and diagnostics of industrial processes are presented and discussed.

  12. Technical co-operation report for 1997. Report by the Director General

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-08-01

    This report covers the IAEA Technical Co-operation (TC) activities during 1997, gives examples of the most significant accomplishments during the year and sets out the status of resources and delivery of the TC programme. The document outlines the steps taken to strengthen planning, design, monitoring and evaluation of TC projects. It also describes how the programme's operational base is being broadened to form new partnerships, using Country Programme Frameworks and Thematic Planning to meet the Member States' priority needs and expand project impact.

  13. Technical co-operation report for 1997. Report by the Director General

    International Nuclear Information System (INIS)

    1998-08-01

    This report covers the IAEA Technical Co-operation (TC) activities during 1997, gives examples of the most significant accomplishments during the year and sets out the status of resources and delivery of the TC programme. The document outlines the steps taken to strengthen planning, design, monitoring and evaluation of TC projects. It also describes how the programme's operational base is being broadened to form new partnerships, using Country Programme Frameworks and Thematic Planning to meet the Member States' priority needs and expand project impact

  14. FY 1992 work plan and technical progress reports

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1992-11-01

    The Desert Research Institute (DRI) is a division of the University of Nevada System devoted to multidisciplinary scientific research. For more than 25 years, DRI has conducted research for the US Department of Energy`s Nevada Field Office (DOE/NV) in support of operations at the Nevada Test Site (NTS). During that time, the research program has grown from an early focus on hydrologic studies to include the areas of geology, archaeology, environmental compliance and monitoring, statistics, database management, public education, and community relations. The range of DRI`s activities has also expanded to include a considerable amount of management and administrative support in addition to scientific investigations. DRI`s work plan for FY 1992 reflects a changing emphasis in DOE/NV activities from nuclear weapons testing to environmental restoration and monitoring. Most of the environmental projects from FY 1991 are continuing, and several new projects have been added to the Environmental Compliance Program. The Office of Technology Development Program, created during FY 1991, also includes a number of environmental projects. This document contains the FY 1992 work plan and quarterly technical progress reports for each DRI project.

  15. Substantiation of the safety in the technical project of Belene NPP

    International Nuclear Information System (INIS)

    Boyadzhiev, A.

    1990-01-01

    The chapter contains an evaluation of the safety of Belene NPP project, based on an experts study of the corresponding volume of the Technical Project documentation of the main contractor and also on other related documents. The authors state that most of the remarks are constitutive, part of them requiring additional information or research. The general explicit conclusion is that the materials on the safety substantiation provided in the project are insufficient for making final statements on the safety of the NPP and there is a need for a detailed analysis and expertise. There are 12 topical conclusion paragraphs and each of them comprises a number of remarks. Among the remarks there are some related to the reactivity coefficient values in certain modes of operation, the problem of the mechanical safety and control system efficiency, the unacceptable operation at nominal power in case of stringent safety rules enforcement, the insufficiency of the PSA, the automatic control systems and the software codes not standing up to the contemporary requirements. (R.Ts.)

  16. Advanced Monitoring Systems Initiative Project Achievements for Environmental Restoration and Waste Management

    International Nuclear Information System (INIS)

    Hohman, E.H.; Lohrstorfer, C.L.; Venedam, R.J.; Weeks, S.J.; Fannin, C.R.

    2006-01-01

    The Advanced Monitoring Systems Initiative (AMSI) project has been in existence since 2002. In this short time period, AMSI has successfully developed, tested and/or demonstrated over 30 advanced sensors and monitoring systems for applications in environmental restoration, waste management and other areas of national interest. This presentation summarizes the AMSI project, and gives examples of recent successes. The purpose of the presentation is to make Symposium attendees aware of AMSI's capabilities and experience, for possible use in the future. Example successes include the following: - Automated hexavalent chromium (Cr(VI)) monitoring in wells alongside the Columbia River; - Atmospheric chemical sensor array for remote, real-time plume tracking; - Wireless sensor platform for long-term monitoring of subsurface moisture; - Embedded piezo-resistive micro-cantilever (EPM) units for carbon tetrachloride (CCl 4 ) and hydrogen cyanide (HCN) detection; - 'iHistorian' for efficient, real-time data management of chemical releases. (authors)

  17. Promoting Gender Parity in Basic Education: Lessons from a Technical Cooperation Project in Yemen

    Science.gov (United States)

    Yuki, Takako; Mizuno, Keiko; Ogawa, Keiichi; Mihoko, Sakai

    2013-01-01

    Many girls are not sent to school in Yemen, despite basic education being free as well as compulsory for all children aged 6-15. Aiming to improve girls' enrollment by increasing parental and community involvement, the Japan International Cooperation Agency (JICA) offered a technical cooperation project in June 2005 called Broadening Regional…

  18. Technical project of a solar water heating system for Hostal FRATERNIDAD, Santiago de Cuba

    International Nuclear Information System (INIS)

    Arzuaga Machado, Yusnel; Torres Ten, Alonso; Fonseca Fonseca, Susana; Fuetes lombá, Osmanys; Massipe Hernández, J. Raúl; Gonzalez, Wagner Roberto

    2017-01-01

    It is presented the technical project of a solar water heating system for Hostal FRATERNIDAD, Santiago de Cuba, Cuba, 20 Cabannas type tourism and a one of 2 square meter flat solar collector will be used, with a storage tank of 200 liters capacity, that is to say one system per cabin. (author)

  19. Spent Nuclear Fuel Project technical baseline document. Fiscal year 1995: Volume 1, Baseline description

    International Nuclear Information System (INIS)

    Womack, J.C.; Cramond, R.; Paedon, R.J.

    1995-01-01

    This document is a revision to WHC-SD-SNF-SD-002, and is issued to support the individual projects that make up the Spent Nuclear Fuel Project in the lower-tier functions, requirements, interfaces, and technical baseline items. It presents results of engineering analyses since Sept. 1994. The mission of the SNFP on the Hanford site is to provide safety, economic, environmentally sound management of Hanford SNF in a manner that stages it to final disposition. This particularly involves K Basin fuel, although other SNF is involved also

  20. Coordinating Management Activities in Distributed Software Development Projects

    OpenAIRE

    Bendeck, Fawsy; Goldmann, Sigrid; Holz, Harald; Kötting, Boris

    1999-01-01

    Coordinating distributed processes, especially engineering and software design processes, has been a research topic for some time now. Several approaches have been published that aim at coordinating large projects in general, and large software development processes in specific. However, most of these approaches focus on the technical part of the design process and omit management activities like planning and scheduling the project, or monitoring it during execution. In this paper, we focus o...

  1. Development of non-intrusive monitoring techniques - ESDRED and TEM projects at Mont Terri and the Grimsel test site

    International Nuclear Information System (INIS)

    Breen, B.; Johnson, M.; Frieg, B.; Blechschmidt, I.; Manukyan, E.; Marelli, S.; Maurer, H.R.

    2008-01-01

    The EC Integrated Project, IP ESDRED (Engineering Studies and Demonstration of Repository Designs) was commissioned to establish a sound technical basis for demonstrating the safety of disposing of spent fuel and long-lived radioactive wastes in deep geological formations and to underpin the development of a common European view on the main issues related to the management and disposal of radioactive waste. The in situ development of non-intrusive monitoring techniques is included within the programme as an important component of the overall ESDRED programme. Monitoring will play an important role in providing information to the repository operator and to society in general and to support decision-making about if and when, to move from one phase to the next. The challenges, when constructing engineered barrier systems (EBS) to isolate the waste, is the ability to monitor the waste and the barriers, once isolated. Conventional monitoring systems depend upon wires or cable s to transfer information from the monitoring sensors outside the barriers. Monitoring sensors also have a limited lifetime and new sensors cannot be emplaced without disturbing the barrier. The development of non-intrusive monitoring systems which do not rely upon 'hard-wired' connection, thus providing the opportunity for continued monitoring after isolation. The ESDRED partners developed a programme utilising cross-hole seismic tomography to monitor an experimental demonstration by Nagra at Mont Terri Underground Research Laboratory (URL). The work programme includes PhD studies to conduct full seismic waveform analysis and to develop algorithms to address natural anisotropy in the Opalinus clay at Mont Terri. Following on from the ESDRED developments, some of ESDRED partner organisations identified a further opportunity for developing in situ monitoring techniques utilising the construction and testing programme of a low pH shotcrete plug being constructed in granite at the Grimsel Test Site

  2. Yakima/Klickitat Fisheries Project Genetic Studies; Yakima/Klickitat Fisheries Project Monitoring and Evaluation, 2005-2006 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Busack, Craig A.; Fritts, Anthony L.; Kassler, Todd (Washington Department of Fish and Wildlife, Olympia, WA)

    2006-05-01

    This report covers one of many topics under the Yakima/Klickitat Fisheries Project's Monitoring and Evaluation Program (YKFPME). The YKFPME is funded under two BPA contracts, one for the Yakama Nation and the other for the Washington Department of Fish and Wildlife (Contract number 22370, Project Number 1995-063-25). A comprehensive summary report for all of the monitoring and evaluation topics will be submitted after all of the topical reports are completed. This approach to reporting enhances the ability of people to get the information they want, enhances timely reporting of results, and provides a condensed synthesis of the whole YKFPME. The current report was completed by the Washington Department of Fish and Wildlife.

  3. Photovoltaic demonstration projects

    Energy Technology Data Exchange (ETDEWEB)

    Kaut, W [Commission of the European Communities, Brussels (Belgium); Gillett, W B; Hacker, R J [Halcrow Gilbert Associates Ltd., Swindon (GB)

    1992-12-31

    This publication, comprising the proceedings of the fifth contractor`s meeting organized by the Commission of the European Communities, Directorate-General for Energy, provides an overview of the photovoltaic demonstration projects which have been supported in the framework of the energy demonstration programme since 1983. It includes reports by each of the contractors who submitted proposals in 1987 and 1988, describing progress within their projects. Projects accepted from earlier calls for proposals and not yet completed were reviewed by a rapporteur and are discussed in the summary section. The results of the performance monitoring of all projects and the lessons drawn from the practical experience of the projects are also presented in the summaries and conclusions. Contractors whose projects were submitted in 1989 were also present at the meeting and contributed to the reported discussions. This proceeding is divided into four sessions (General, Housing, technical presentations, other applications) and 24 papers are offered.

  4. A Web-Based Monitoring System for Multidisciplinary Design Projects

    Science.gov (United States)

    Rogers, James L.; Salas, Andrea O.; Weston, Robert P.

    1998-01-01

    In today's competitive environment, both industry and government agencies are under pressure to reduce the time and cost of multidisciplinary design projects. New tools have been introduced to assist in this process by facilitating the integration of and communication among diverse disciplinary codes. One such tool, a framework for multidisciplinary computational environments, is defined as a hardware and software architecture that enables integration, execution, and communication among diverse disciplinary processes. An examination of current frameworks reveals weaknesses in various areas, such as sequencing, displaying, monitoring, and controlling the design process. The objective of this research is to explore how Web technology, integrated with an existing framework, can improve these areas of weakness. This paper describes a Web-based system that optimizes and controls the execution sequence of design processes; and monitors the project status and results. The three-stage evolution of the system with increasingly complex problems demonstrates the feasibility of this approach.

  5. Project 57 Air Monitoring Report: October 1, 2013, through December 31, 2014

    Energy Technology Data Exchange (ETDEWEB)

    Mizell, Steve A. [Desert Research Inst. (DRI), Las Vegas, NV (United States); Nikolich, George [Desert Research Inst. (DRI), Las Vegas, NV (United States); McCurdy, Greg [Desert Research Inst. (DRI), Reno, NV (United States); Shadel, Craig [Desert Research Inst. (DRI), Las Vegas, NV (United States); Miller, Julianne J. [Desert Research Inst. (DRI), Las Vegas, NV (United States)

    2016-02-01

    On April 24, 1957, the Atomic Energy Commission (AEC, now the Department of Energy [DOE]) conducted the Project 57 safety experiment in western Emigrant Valley north east of the Nevada National Security Site (NNSS, formerly the Nevada Test Site) on lands withdrawn by the Department of Defense (DoD) for the Nevada Test and Training Range (NTTR). The test was undertaken to develop (1) a means of estimating plutonium distribution resulting from a nonnuclear detonation; (2) biomedical evaluation techniques for use in plutonium-laden environments; (3) methods of surface decontamination; and (4) instruments and field procedures for prompt estimation of alpha contamination (Shreve, 1958). Although the test did not result in the fission of nuclear materials, it did disseminate plutonium across the land surface. Following the experiment, the AEC fenced the contaminated area and returned control of the surrounding land to the DoD. Various radiological surveys have been performed in the area and in 2007, the DOE expanded the demarked contamination area by posting signs 200 to 400 feet (60 to 120 meters) outside of the original fence. Plutonium in soil is thought to attach preferentially to smaller particles. Therefore, redistribution of soil particulates by wind (dust) is the mechanism most likely to transport plutonium beyond the boundary of the Project 57 contamination area. In 2011, DRI installed two instrumentation towers to measure radiological, meteorological, and dust conditions. The monitoring activity was implemented to determine if radionuclide contamination was detectable in samples of airborne dust and characterize meteorological and environmental parameters that influence dust transport. Collected data also permits comparison of radiological conditions at the Project 57 monitoring stations to conditions observed at Community Environmental Monitoring Program (CEMP) stations around the NTTR. Biweekly samples of airborne particulates are submitted for laboratory

  6. The Environmental Trilogy project: Balancing technical, institutional, and cultural perspectives to environmental management

    International Nuclear Information System (INIS)

    Kurstedt, Pamela S.; Jim, Russell; Wadsworth, Bonnie C.W.; Burke, William H.; Kurstedt, Harold A. Jr.

    1992-01-01

    'The significant problems we face cannot be solved at the same level of thinking we were at when we created them.' Albert Einstein. I've identified an initial set of three perspectives important to building an integrated, comprehensive approach to managing the environment - technical, institutional, and cultural. I've constructed an holistic model (called the Environmental Trilogy) for environmental management, encompassing at least these three perspectives and their interrelationships. In this paper, I outline the model and report the results of a working session facilitated at Virginia Tech in Blacksburg, Virginia, in October 1991, involving three representatives from each of the technical, institutional, and cultural perspectives. The institutional members of this group were people who understand institutional effects, rather than those who represent institutions. The working group discussed and analyzed the technical-institutional, technical-cultural, and institutional-cultural inter- relationships of the environmental trilogy. The goals of the working group were to put structure on the environmental trilogy model, to facilitate the definition of variables, and explore relationships between and among variables. The working group members are to continue studying issues and components, perspectives, connections, and cause-and-effect in the models and report back to interested parties. The outcome is projected to be a more holistic, integrated view of the environment. (author)

  7. Project T.E.A.M. (Technical Education Advancement Modules). Introduction to Statistical Process Control.

    Science.gov (United States)

    Billings, Paul H.

    This instructional guide, one of a series developed by the Technical Education Advancement Modules (TEAM) project, is a 6-hour introductory module on statistical process control (SPC), designed to develop competencies in the following skill areas: (1) identification of the three classes of SPC use; (2) understanding a process and how it works; (3)…

  8. Manhattan Project Technical Series The Chemistry of Uranium (I) Chapters 1-10

    International Nuclear Information System (INIS)

    Rabinowitch, E. I.; Katz, J. J.

    1946-01-01

    This constitutes Chapters 1 through 10. inclusive, of The Survey Volume on Uranium Chemistry prepared for the Manhattan Project Technical Series. Chapters are titled: Nuclear Properties of Uranium; Properties of the Uranium Atom; Uranium in Nature; Extraction of Uranium from Ores and Preparation of Uranium Metal; Physical Properties of Uranium Metal; Chemical Properties of Uranium Metal; Intermetallic Compounds and Alloy systems of Uranium; the Uranium-Hydrogen System; Uranium Borides, Carbides, and Silicides; Uranium Nitrides, Phosphides, Arsenides, and Antimonides.

  9. Direct Satellite Data Acquisition and its Application for Large -scale Monitoring Projects in Russia

    Science.gov (United States)

    Gershenzon, O.

    2011-12-01

    ScanEx RDC created an infrastructure (ground stations network) to acquire and process remote sensing data from different satellites: Terra, Aqua, Landsat, IRS-P5/P6, SPOT 4/5, FORMOSAT-2, EROS A/B, RADARSAT-1/2, ENVISAT-1. It owns image archives from these satellites as well as from SPOT-2 and CARTOSAT-2. ScanEx RDC builds and delivers remote sensing ground stations (working with up to 15 satellites); and owns the ground stations network to acquire data for Russia and surrounding territory. ScanEx stations are the basic component in departmental networks of remote sensing data acquisition for different state authorities (Roshydromet, Ministry of Natural Recourses, Emercom) and University- based remote sensing data acquisition and processing centers in Russia and abroad. ScanEx performs large-scale projects in collaboration with government agencies to monitor forests, floods, fires, sea surface pollution, and ice situation in Northern Russia. During 2010-2011 ScanEx conducted daily monitoring of wild fires in Russia detecting and registering thermal anomalies using data from Terra, Aqua, Landsat and SPOT satellites. Detailed SPOT 4/5 data is used to analyze burnt areas and to assess damage caused by fire. Satellite data along with other information about fire situation in Russia was daily updated and published via free-access Internet geoportal. A few projects ScanEx conducted together with environmental NGO. Project "Satellite monitoring of Especially Protected Natural Areas of Russia and its results visualization on geoportal was conducted in cooperation with NGO "Transparent World". The project's goal was to observe natural phenomena and economical activity, including illegal, by means of Earth remote sensing data. Monitoring is based on multi-temporal optical space imagery of different spatial resolution. Project results include detection of anthropogenic objects that appeared in the vicinity or even within the border of natural territories, that have never been

  10. International Remote Monitoring Project Embalse Nuclear Power Station, Argentina Embalse Remote Monitoring System

    International Nuclear Information System (INIS)

    Schneider, Sigfried L.; Glidewell, Donnie D.; Bonino, Anibal; Bosler, Gene; Mercer, David; Maxey, Curt; Vones, Jaromir; Martelle, Guy; Busse, James; Kadner, Steve; White, Mike; Rovere, Luis

    1999-01-01

    The Autoridad Regulatoria Nuclear of Argentina (ARN), the International Atomic Energy Agency (IAEA), ABACC, the US Department of Energy, and the US Support Program POTAS, cooperated in the development of a Remote Monitoring System for nuclear nonproliferation efforts. This system was installed at the Embalse Nuclear Power Station last year to evaluate the feasibility of using radiation sensors in monitoring the transfer of spent fuel from the spent fuel pond to dry storage. The key element in this process is to maintain continuity of knowledge throughout the entire transfer process. This project evaluated the fundamental design and implementation of the Remote Monitoring System in its application to regional and international safeguard efficiency. New technology has been developed to enhance the design of the system to include storage capability on board sensor platforms. This evaluation has led to design enhancements that will assure that no data loss will occur during loss of RF transmission of the sensors

  11. Radioactivity monitoring of the Turkish Black Sea coast as a part of the IAEA model project 'Marine environmental assessment of the Black Sea region' and nuclear techniques for the environmental management of water resources in Turkey

    International Nuclear Information System (INIS)

    Goktepe, B.G.; Koksal, G.; Gungor, N.; Gungor, E.; Kose, A.; Kucukcezzar, R.; Varinlioglu, A.; Erkol, A.Y.; Karakelle, B.; Osvath, I.; Fowler, S.

    2002-01-01

    A wide scope Regional Technical Co-operation Project RER/2/003 'Marine environmental assessment of the Black Sea region' is implemented by the International Atomic Energy Agency (IAEA) in the period 1995-2001. This project is initiated in response to the needs of participating Member-States - the six Black Sea coastal countries (Bulgaria, Romania, Ukraine, Russian Federation, Georgia and Turkey) to establish capabilities for reliably assessing radionuclides in the Black Sea environment and applying tracer technique to marine pollution studies. The project has various important aspects: Scientifically; one of the major environmental issue radioactivity pollution is addressed. Technically; laboratory capability for transuranic analysis is being developed. Economically; the reversing the ecological deterioration and developing sustainable uses of the Black Sea and its natural resources is one of the major interest. Politically; responsibility of pollution control and rehabilitation plans of six Black Sea countries are addressed thought various conventions and declarations. Socio-economically; fisheries and tourism sectors are expected to benefit. Highlights from the joint radioactivity monitoring program of the project among six Black Sea countries are outlined. Examples from Turkish monitoring work consists of the routine sampling of sea water, algae, mussels, fish samples and beach sand from the selected stations along the Black Sea coast are presented for illustration. Insights gained from the application of nuclear techniques for the 'Pollution Investigation of the Kucukcekmece Lake' and the 'Marine environmental assessment of the Black Sea region' Model Technical Co-operation Project carried out at the Cekmece Nuclear Research Center supporting by the IAEA are presented. Concluding remarks include the vital importance of protection of the water resources within Eurasian countries and the need for strong cooperation among nuclear research centers

  12. Epilogue. Environmental aspects of the design and construction of the Gabcikovo hydroelectric power project and environmental impact review based on the three-year monitoring and on the joint Slovak-Hungarian monitoring

    International Nuclear Information System (INIS)

    Lejon, E.

    1996-01-01

    In this chapter of the book author deals with the Gabcikovo-Nagymaros Project (GNP). The Gabcikovo part of the hydroelectric power project was based on a combination of flood control, navigational improvements and the production of electric energy. The Gabcikovo Project has not only saved the inundation area with the flood plain ecotopes, but also includes a wide variety of tools for surface and ground water management, and thus also for the management, or optimalization, of the development of agricultural conditions, inundation biotopes, forestry, river branches biotopes, flood management and the flooding of parts of the inundation area, sedimentation and erosion processes, ground and surface water quality, and other environmental effects management. The GNP, as conceived in the 1977 International Czechoslovak-Hungarian Treaty, is located roughly between 1,860 rkm (river kilometer), at Bratislava, and 1,696 rkm, at Nagymaros. The Hungarians unilaterally decided to abandon the construction of Nagyamaros, and to suspend the work to be carried out on the GNP. After the decision, in order to minimize the spread of economic and ecologic damages to ensure flood protection at least on the Hungarian Szikekoez, to exploit the available power potential, and to create conditions necessary for navigation on the Danube, the Government of the Czech and Slovak Federal Republic decided in December 1991, to put nearly ready Gabcikovo part of the system into operation, constructing the necessary technical structures on their own territory and inside of the construction area of the original Project. These technical structures are known as 'Variant C'. 'Variant C' is situated inside the area of the original project, replaces the function of the Dunakiliti weir in Hungary and uses all of the completed structures of the Gabcikovo part of the Project. The geology, Danube, ground water, pre-dam long-term development, changes after putting the Gabcikovo structures into operation, as well

  13. Technical data management at the Yucca Mountain Site Characterization Project

    International Nuclear Information System (INIS)

    Statler, J.; Newbury, C.M.; Heitland, G.W.

    1992-01-01

    The Department of Energy/Office of Civilian Radioactive waste Management (DOE/OCRWM) is responsible for the characterization of Yucca Mountain, Nevada, to determine its potential as a site of a high-level radioactive waste repository. The characterization of Yucca Mountain encompasses many diverse investigations, both onsite and in laboratories across the country. Investigations are being conducted of the geology, hydrology, mineralogy, paleoclimate, geotechnical properties, and archeology of the area, to name a few. Effective program management requires that data from site investigations be processed, interpreted and disseminated in a timely manner to support model development and validation, repository design, and performance assessment. The Program must also meet regulatory requirements for making the technical data accessible to a variety of external users throughout the life of the Project. Finally, the DOE/OCRWM must make available the data or its description and access location available for use in support of the license application and supporting documentation. To accomplish these objectives, scientific and engineering data, generated by site characterization activities, and technical data, generated by environmental and socioeconomic impact assessment activities, must be systematically identified, cataloged, stored and disseminated in a controlled manner

  14. DECOVALEX II PROJECT. Technical report - Task 1A and 1B

    International Nuclear Information System (INIS)

    Lanru Jing; Stephansson, Ove; Kautsky, F.

    1998-08-01

    DECOVALEX II project started in November 1995 as a continuation of the DECOVALEX I project, which was completed at the end of 1994. The project was initiated by recognizing the fact that a proper evaluation of the current capacities of numerical modelling of the coupled T-H-M processes in fractured media is needed not only for small scale, well controlled laboratory test cases such as those studied in DECOVALEX I, but also for less characterised, more complex and realistic in-situ experiments. This will contribute to validation and confidence building in the current mathematical models, numerical methods and computer codes. Four tasks were defined in the DECOVALEX II project: TASK 1 - numerical study of the RCF3 pumping test and shaft excavation at Sellafield by Nirex, UK; TASK 2 - numerical study of the in-situ T-H-M experiments at Kamaishi Mine by PNC, Japan; TASK 3 - review of current state-of-the-art of rock joint research and TASK 4 - report on the coupled T-H-M issues related to repository design and performance assessment. This report is one of the technical reports of the DECOVALEX II project, describing the work performed for TASK 1A and 1B - the predictions and model calibrations for the RCF 3 pumping test at Sellafield. Presented in this report are the descriptions of the project, tasks, approaches, methods and results of numerical modelling work carried out by the research teams. The report is a summary of the research reports written by the research teams and submitted to the project secretariat, and the discussions held during project workshops and task force group meetings. The opinions and conclusions in this report, however, reflect only ideas of the authors, not necessarily a collective representation of the funding organisations of the project

  15. Methodology for quantitative assessment of technical condition in industrial systems

    Energy Technology Data Exchange (ETDEWEB)

    Steinbach, C [Marintek AS (Norway); Soerli, A [Statoil (Norway)

    1999-12-31

    As part of the Eureka project Ageing Management a methodology has been developed to assess the technical condition of industrial systems. The first part of the presentation argues for the use of technical condition parameters in the context of maintenance strategies. Thereafter the term `technical condition` is defined more thoroughly as it is used within the project. It is claimed that the technical condition of a system - such as a feed water system of a nuclear power plant, or a water injection system on an oil platform - may be determined by aggregating the condition of its smaller components using a hierarchic approach. The hierarchy has to be defined in co-operation with experienced personnel and reflects the impact of degradation of elements on a lower level to nodes higher in the hierarchy. The impact is divided into five categories with respect to safety, environment, availability, costs and man-hours. To determine the technical condition of the bottom elements of the hierarchy, available data is used from both an on-line condition monitoring system and maintenance history. The second part of the presentation introduces the prototype software tool TeCoMan which utilises the theory and applies it to installations of the participating companies. First results and gained experiences with the method and tool are discussed. (orig.)

  16. Methodology for quantitative assessment of technical condition in industrial systems

    Energy Technology Data Exchange (ETDEWEB)

    Steinbach, C. [Marintek AS (Norway); Soerli, A. [Statoil (Norway)

    1998-12-31

    As part of the Eureka project Ageing Management a methodology has been developed to assess the technical condition of industrial systems. The first part of the presentation argues for the use of technical condition parameters in the context of maintenance strategies. Thereafter the term `technical condition` is defined more thoroughly as it is used within the project. It is claimed that the technical condition of a system - such as a feed water system of a nuclear power plant, or a water injection system on an oil platform - may be determined by aggregating the condition of its smaller components using a hierarchic approach. The hierarchy has to be defined in co-operation with experienced personnel and reflects the impact of degradation of elements on a lower level to nodes higher in the hierarchy. The impact is divided into five categories with respect to safety, environment, availability, costs and man-hours. To determine the technical condition of the bottom elements of the hierarchy, available data is used from both an on-line condition monitoring system and maintenance history. The second part of the presentation introduces the prototype software tool TeCoMan which utilises the theory and applies it to installations of the participating companies. First results and gained experiences with the method and tool are discussed. (orig.)

  17. Yakima/Klickitat Fisheries Project; Washington Department of Fish and Wildlife Policy/Technical Involvement and Planning, 2001-2002 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Easterbrooks, John A.; Pearsons, Todd N. (Washington Department of Fish and Wildlife, Olympia, WA)

    2003-03-01

    Department of Fish and Wildlife (WDFW). The functions of the parties are described in an MOU between the YN and the WDFW. A Scientific and Technical Advisory Committee (STAC) consisting of one representative from each management entity reports to the Policy Group and provides technical input on policy and other issues. Additional committee's, such as the Monitoring Implementation and Planning Team (MIPT), serve as the discretion of STAC. The Policy Group and STAC meet periodically (usually monthly) to conduct the business of the YKFP. Although the YKFP is an all stocks initiative (BPA 1996), most effort to date has been directed at spring chinook salmon and coho salmon. This report is a compilation of the year's activities between August 1, 2001 and July 31, 2002. All findings should be considered preliminary until data collection is completed or the information is published in a peer-reviewed journal.

  18. Means of storage and automated monitoring of versions of text technical documentation

    Science.gov (United States)

    Leonovets, S. A.; Shukalov, A. V.; Zharinov, I. O.

    2018-03-01

    The paper presents automation of the process of preparation, storage and monitoring of version control of a text designer, and program documentation by means of the specialized software is considered. Automation of preparation of documentation is based on processing of the engineering data which are contained in the specifications and technical documentation or in the specification. Data handling assumes existence of strictly structured electronic documents prepared in widespread formats according to templates on the basis of industry standards and generation by an automated method of the program or designer text document. Further life cycle of the document and engineering data entering it are controlled. At each stage of life cycle, archive data storage is carried out. Studies of high-speed performance of use of different widespread document formats in case of automated monitoring and storage are given. The new developed software and the work benches available to the developer of the instrumental equipment are described.

  19. Involvement of Individuals in the Development of Technical Solutions and Rules of Management for Building Renovation Projects: A Case Study of Latvia

    Science.gov (United States)

    Pukite, I.; Grekis, A.; Geipele, I.; Zeltins, N.

    2017-08-01

    In March 2016, the Latvian government approved a new support program for increasing energy efficiency in residential apartment buildings. For the support of renovation of apartment buildings in the period from 2016 to 2023, 166 470 588 EUR will be available. Different persons, such as energy auditors, designers, architects, project managers and builders, will be involved in the process of planning, development and implementation of building renovation. At the development stage of the building renovation project, special attention should be devoted to the first stage - energy audit and technical project development. The problem arises due to the fact that each of these individuals, during the development of technical building documentation, does not work as a completely unified system. The implementation of construction project planning and organisational management system is one of the most important factors to guarantee that the quality of building renovation project is ensured in accordance with the laws and regulatory standards. The paper studies mutual cooperation, professionalism and the role of information feedback of personnel involved in the planning stage of building renovation, which is an essential prerequisite for the renovation process in order to achieve high quality of work and reduce the energy performance indicator. The present research includes the analysis of different technical solutions and their impact on energy efficiency. Mutual harmonisation of technical specifications is also investigated.

  20. Routine Radiological Environmental Monitoring Plan. Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    Bechtel Nevada

    1999-12-31

    The U.S. Department of Energy manages the Nevada Test Site in a manner that meets evolving DOE Missions and responds to the concerns of affected and interested individuals and agencies. This Routine Radiological Monitoring Plan addressess complicance with DOE Orders 5400.1 and 5400.5 and other drivers requiring routine effluent monitoring and environmental surveillance on the Nevada Test Site. This monitoring plan, prepared in 1998, addresses the activities conducted onsite NTS under the Final Environmental Impact Statement and Record of Decision. This radiological monitoring plan, prepared on behalf of the Nevada Test Site Landlord, brings together sitewide environmental surveillance; site-specific effluent monitoring; and operational monitoring conducted by various missions, programs, and projects on the NTS. The plan provides an approach to identifying and conducting routine radiological monitoring at the NTS, based on integrated technical, scientific, and regulatory complicance data needs.

  1. Using Landsat imagery to detect, monitor, and project net landscape change

    Science.gov (United States)

    Reker, Ryan R.; Sohl, Terry L.; Gallant, Alisa L.

    2015-01-01

    Detailed landscape information is a necessary component to bird habitat conservation planning. The U.S. Geological Survey (USGS) Earth Resources Observation and Science (EROS) Center has been providing information on the Earth’s surface for over 40 years via the continuous series of Landsat satellites. In addition to operating, processing, and disseminating satellite images, EROS is the home to nationwide and global landscape mapping, monitoring, and projection products, including:National Land Cover Database (NLCD) – the definitive land cover dataset for the U.S., with updates occurring at five-year intervals;Global Land Cover Monitoring – producing 30m resolution global land cover;LANDFIRE – Landscape Fire and Resource Management Planning Tools–EROS is a partner in this joint program between U.S. Department of Agriculture and Department of Interior that produces consistent, comprehensive, geospatial data and databases that describe vegetation, wildland fuel, and fire regimes across the U.S.;Land Cover Trends – a landscape monitoring and assessment effort to understand the rates, trends, causes, and consequences of contemporary U.S. land use and land cover change; andLand Use and Land Cover (LULC) Modeling – a project extending contemporary databases of landscape change forward and backward in time through moderate-resolution land cover projections.

  2. International Energy Agency (IEA) Greenhouse Gas (GHG) Weyburn-Midale CO₂ Monitoring and Storage Project

    Energy Technology Data Exchange (ETDEWEB)

    Sacuta, Norm [Petroleum Technology Research Centre Incorporated, Saskatchewan (Canada); Young, Aleana [Petroleum Technology Research Centre Incorporated, Saskatchewan (Canada); Worth, Kyle [Petroleum Technology Research Centre Incorporated, Saskatchewan (Canada)

    2015-12-22

    The IEAGHG Weyburn-Midale CO₂ Monitoring and Storage Project (WMP) began in 2000 with the first four years of research that confirmed the suitability of the containment complex of the Weyburn oil field in southeastern Saskatchewan as a storage location for CO₂ injected as part of enhanced oil recovery (EOR) operations. The first half of this report covers research conducted from 2010 to 2012, under the funding of the United States Department of Energy (contract DEFE0002697), the Government of Canada, and various other governmental and industry sponsors. The work includes more in-depth analysis of various components of a measurement, monitoring and verification (MMV) program through investigation of data on site characterization and geological integrity, wellbore integrity, storage monitoring (geophysical and geochemical), and performance/risk assessment. These results then led to the development of a Best Practices Manual (BPM) providing oilfield and project operators with guidance on CO₂ storage and CO₂-EOR. In 2013, the USDOE and Government of Saskatchewan exercised an optional phase of the same project to further develop and deploy applied research tools, technologies, and methodologies to the data and research at Weyburn with the aim of assisting regulators and operators in transitioning CO₂-EOR operations into permanent storage. This work, detailed in the second half of this report, involves seven targeted research projects – evaluating the minimum dataset for confirming secure storage; additional overburden monitoring; passive seismic monitoring; history-matched modelling; developing proper wellbore design; casing corrosion evaluation; and assessment of post CO₂-injected core samples. The results from the final and optional phases of the Weyburn-Midale Project confirm the suitability of CO₂-EOR fields for the injection of CO₂, and further, highlight the necessary MMV and follow-up monitoring required for these operations to be considered

  3. Aviation Trends Related to Atmospheric Environment Safety Technologies Project Technical Challenges

    Science.gov (United States)

    Reveley, Mary S.; Withrow, Colleen A.; Barr, Lawrence C.; Evans, Joni K.; Leone, Karen M.; Jones, Sharon M.

    2014-01-01

    Current and future aviation safety trends related to the National Aeronautics and Space Administration's Atmospheric Environment Safety Technologies Project's three technical challenges (engine icing characterization and simulation capability; airframe icing simulation and engineering tool capability; and atmospheric hazard sensing and mitigation technology capability) were assessed by examining the National Transportation Safety Board (NTSB) accident database (1989 to 2008), incidents from the Federal Aviation Administration (FAA) accident/incident database (1989 to 2006), and literature from various industry and government sources. The accident and incident data were examined for events involving fixed-wing airplanes operating under Federal Aviation Regulation (FAR) Parts 121, 135, and 91 for atmospheric conditions related to airframe icing, ice-crystal engine icing, turbulence, clear air turbulence, wake vortex, lightning, and low visibility (fog, low ceiling, clouds, precipitation, and low lighting). Five future aviation safety risk areas associated with the three AEST technical challenges were identified after an exhaustive survey of a variety of sources and include: approach and landing accident reduction, icing/ice detection, loss of control in flight, super density operations, and runway safety.

  4. Emergency monitoring strategy and radiation measurements document of the NKS project emergency management and radiation monitoring in nuclear and radiological accidents (EMARAD)

    Energy Technology Data Exchange (ETDEWEB)

    Lahtinen, J. [Radiation and Nuclear Safety Authority (STUK) (Finland)

    2006-04-15

    This report is one of the deliverables of the NKS Project Emergency management and radiation monitoring in nuclear and radiological accidents (EMARAD) (20022005). The project and the overall results are briefly described in the NKS publication 'Emergency Management and Radiation Monitoring in Nuclear and Radiological Accidents. Summary Report on the NKS Project EMARAD' (NKS-137, April 2006). In a nuclear or radiological emergency, all radiation measurements must be performed efficiently and the results interpreted correctly in order to provide the decision-makers with adequate data needed in analysing the situation and carrying out countermeasures. Managing measurements in different situations in a proper way requires the existence of pre-prepared emergency monitoring strategies. Preparing a comprehensive yet versatile strategy is not an easy task to perform because there are lots of different factors that have to be taken into account. The primary objective of this study was to discuss the general problematics concerning emergency monitoring strategies and to describe a few important features of an efficient emergency monitoring system as well as factors affecting measurement activities in practise. Some information concerning the current situation in the Nordic countries has also been included. (au)

  5. U-tube based near-surface environmental monitoring in the Shenhua carbon dioxide capture and storage (CCS) project.

    Science.gov (United States)

    Li, Qi; Song, Ranran; Shi, Hui; Ma, Jianli; Liu, Xuehao; Li, Xiaochun

    2018-04-01

    The CO 2 injected into deep formations during implementation of carbon dioxide (CO 2 ) capture and storage (CCS) technology may leak and migrate into shallow aquifers or ground surfaces through a variety of pathways over a long period. The leaked CO 2 can threaten shallow environments as well as human health. Therefore, almost all monitoring programs for CCS projects around the world contain near-surface monitoring. This paper presents a U-tube based near-surface monitoring technology focusing on its first application in the Shenhua CCS demonstration project, located in the Ordos Basin, Inner Mongolia, China. First, background information on the site monitoring program of the Shenhua CCS demonstration project was provided. Then, the principle of fluid sampling and the monitoring methods were summarized for the U-tube sampler system, and the monitoring data were analyzed in detail. The U-tube based monitoring results showed that the U-tube sampler system is accurate, flexible, and representative of the subsurface fluid sampling process. The monitoring indicators for the subsurface water and soil gas at the Shenhua CCS site indicate good stratification characteristics. The concentration level of each monitoring indicator decreases with increasing depth. Finally, the significance of this near-surface environmental monitoring technology for CO 2 leakage assessments was preliminarily confirmed at the Shenhua CCS site. The application potential of the U-tube based monitoring technology was also demonstrated during the subsurface environmental monitoring of other CCS projects.

  6. The Development of a Project-Based Collaborative Technical Writing Model Founded on Learner Feedback in a Tertiary Aeronautical Engineering Program

    Science.gov (United States)

    Tatzl, Dietmar; Hassler, Wolfgang; Messnarz, Bernd; Fluhr, Holger

    2012-01-01

    The present article describes and evaluates collaborative interdisciplinary group projects initiated by content lecturers and an English-as-a-Foreign-Language (EFL) instructor for the purpose of teaching technical writing skills in an aeronautical engineering degree program. The proposed technical writing model is assessed against the results of a…

  7. Hanford Environmental Dose Reconstruction Project monthly report, August 1992

    International Nuclear Information System (INIS)

    McMakin, A.H.; Cannon, S.D.; Finch, S.M.

    1992-01-01

    The objective of the Hanford Environmental Dose Reconstruction (HEDR) Project is to estimate the radiation doses that individuals and populations could have received from nuclear operations at Hanford since 1944. The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed from release to impact on humans (dose estimates): source terms; environmental transport; environmental monitoring data; demography; food consumption; and agriculture; and environmental pathway and dose estimates

  8. Using Model-Based System Engineering to Provide Artifacts for NASA Project Life-Cycle and Technical Reviews Presentation

    Science.gov (United States)

    Parrott, Edith L.; Weiland, Karen J.

    2017-01-01

    This is the presentation for the AIAA Space conference in September 2017. It highlights key information from Using Model-Based Systems Engineering to Provide Artifacts for NASA Project Life-cycle and Technical Reviews paper.

  9. Ground-water monitoring compliance projects for Hanford Site facilities: Annual progress report for 1987

    International Nuclear Information System (INIS)

    Hall, S.H.

    1988-09-01

    This report describes progress during 1987 of five Hanford Site ground water monitoring projects. Four of these projects are being conducted according to regulations based on the federal Resource Conservation and Recovery Act of 1976 and the state Hazardous Waste Management Act. The fifth project is being conducted according to regulations based on the state Solid Waste Management Act. The five projects discussed herein are: 300 Area Process Trenches; 183-H Solar Evaporation Basins; 200 Areas Low-Level Burial Grounds; Nonradioactive Dangerous Waste Landfill; Solid Waste Landfill. For each of the projects, there are included, as applicable, discussions of monitoring well installations, water-table measurements, background and/or downgradient water quality and results of chemical analysis, and extent and rate of movement of contaminant plumes. 14 refs., 30 figs., 13 tabs

  10. Support of the Ukrainian supervisory authority in establishing a modern nuclear power plant monitoring

    International Nuclear Information System (INIS)

    Beyer, M.; Carl, H.; Schumann, P.; Seidel, A.; Weiss, F.P.; Zschau, J.; Nowak, K.

    2000-01-01

    The type of monitoring of nuclear power plants in Ukraine practiced in the early nineties provided the supervisory authority with only inadequate access to information about the current safety status of plants. For the Zaporozhye nuclear power plant, unit 5, a technical system to improve operational monitoring has been designed, installed and commissioned for trial operation at the end of 1995 as a pilot project. The system complements existing operational checking and monitoring facilities by including modern means of information technology. It enables concentration on a continuous monitoring of the state of unit 5 in normal operation and in cases of anormalies or incidents so that when recognisable deviations from the regular plant operation occur, the authority can immediately inquire and if necessary impose conditions on the operator. In 1997, the Information and Crisis Centre of the Ukraninian supervisory authority in Kiev was equipped with the most essential technical means necessary for quasi-simultaneous transfer of data and voice and for monitoring purposes and connected to the Centre to the Zaporozhye system. A similar monitoring system for both VVER-440 units of the Rovno nuclear power plant by analogy with the pilot project was specified and put into operation and connected to the ICC in 1998. (orig.) [de

  11. Technical assistance contractor Management Plan

    International Nuclear Information System (INIS)

    1993-09-01

    The Technical Assistance Contractor (TAC) for the Uranium Mill Tailings Remedial Action (UMTRA) Project comprises Jacobs Engineering Group Inc. (JEG) and its major teaming partners [Roy F. Weston, Inc. (RFW), Sergent, Hauskins ampersand Beckwith Agra, Inc. (SHB Agra), and Geraghty ampersand Miller, Inc. (G ampersand M)]. The first three companies have worked together effectively on the UMTRA Project for more than 10 years. With the initiation of the UMTRA Groundwater Project in April 1991, a need arose to increase the TAC's groundwater technical breadth and depth, so G ampersand M was brought in to augment the team's capabilities. The TAC contract's scope is to provide technical, analytical, environmental, engineering, design, inspection, and management support services to the US Department of Energy (DOE) for both surface and groundwater projects. The TAC team continues to support the DOE in completing surface remedial actions and initiating groundwater remediation work for start-up, characterization, design, construction oversight, and remedial operations. A key feature of the TAC's management approach is the extensive set of communication systems implemented for the UMTRA Project. These systems assist all functional disciplines in performing UMTRA Project tasks associated with management, technical support, administrative support, and financial/project controls

  12. On-line monitoring for calibration reduction

    International Nuclear Information System (INIS)

    Hoffmann, Mario; Gran, Frauke Schmitt; Thunem, Harald P-J.

    2004-04-01

    On-Line Monitoring (OLM) of a channel's calibration state evaluates instrument channel performance by assessing its consistency with other plant indications. Industry and experience at several plants has shown this overall approach to be very effective in identifying instrument channels that are exhibiting degrading or inconsistent performance characteristics. The Halden Reactor Project has developed the signal validation system PEANO, which can be used to assist with the tasks of OLM. To further enhance the PEANO System for use as a calibration reduction tool, the following two additional modules have been developed; HRP Prox, which performs pre-processing and statistical analysis of signal data, Batch Monitoring Module (BMM), which is an off-line batch monitoring and reporting suite. The purpose and functionality of the HRP Prox and BMM modules are discussed in this report, as well as the improvements made to the PEANO Server to support these new modules. The Halden Reactor Project has established a Halden On-Line Monitoring User Group (HOLMUG), devoted to the discussion and implementation of on-line monitoring techniques in power plants. It is formed by utilities, vendors, regulatory bodies and research institutes that meet regularly to discuss implementation aspects of on-line monitoring, technical specification changes, cost-benefit analysis and regulatory issues. (Author)

  13. Technical Status Report of the Regulatory Assistance Project: October 2001-February 2003

    Energy Technology Data Exchange (ETDEWEB)

    2003-08-01

    This report details the work undertaken from October 2001 to February 2003 by the Regulatory Assistance Project under subcontract to the National Renewable Energy Laboratory. The objectives of this work were to develop regulatory policy options that would reduce the institutional and infrastructure barriers to full-value deployment of distributed power systems. Specific tasks included leading technical workshops on removing or overcoming regulatory barriers to distributed resources for state utility regulators and developing a draft model rule on emission performance standards for distributed generation.

  14. NASA/DOD Aerospace Knowledge Diffusion Research Project. Paper 36: Technical uncertainty as a correlate of information use by US industry-affiliated aerospace engineers and scientists

    Science.gov (United States)

    Pinelli, Thomas E.; Glassman, Nanci A.; Affelder, Linda O.; Hecht, Laura M.; Kennedy, John M.; Barclay, Rebecca O.

    1994-01-01

    This paper reports the results of an exploratory study that investigated the influence of technical uncertainty on the use of information and information sources by U.S. industry-affiliated aerospace engineers and scientists in completing or solving a project, task, or problem. Data were collected through a self-administered questionnaire. Survey participants were U.S. aerospace engineers and scientists whose names appeared on the Society of Automotive Engineers (SAE) mailing list. The results support the findings of previous research and the following study assumptions. Information and information-source use differ for projects, problems, and tasks with high and low technical uncertainty. As technical uncertainty increases, information-source use changes from internal to external and from informal to formal sources. As technical uncertainty increases, so too does the use of federally funded aerospace research and development (R&D). The use of formal information sources to learn about federally funded aerospace R&D differs for projects, problems, and tasks with high and low technical uncertainty.

  15. IDF Sagebrush Habitat Mitigation Project: FY2008 Compensation Area Monitoring Report

    Energy Technology Data Exchange (ETDEWEB)

    Durham, Robin E.; Sackschewsky, Michael R.

    2008-09-01

    This document provides a review and status of activities conducted in support of the CH2MHill Hanford Group (CHG) Compensatory Mitigation Implementation Plan (MIP) for the Integrated Disposal Facility (IDF). It includes time-zero monitoring results for planting activities conducted in December 2007, annual survival monitoring for all planting years, a summary of artificial burrow observations, and recommendations for the successful completion of DOE mitigation commitments for this project.

  16. Monitoring and economic factors affecting the economic viability of afforestation for carbon sequestration projects

    International Nuclear Information System (INIS)

    Robertson, Kimberly; Loza-Balbuena, Isabel; Ford-Robertson, Justin

    2004-01-01

    The Kyoto Protocol is the first step towards achieving the objectives of the United Nations Framework Convention on Climate Change and aims among others to promote 'the protection and enhancement of carbon sinks and reservoirs'. To encourage afforestation for carbon sequestration a project must be economically viable. This study uses a model to analyse the impact on project viability of a range of carbon monitoring options, international carbon credit value and discount rate, applied to a Pinus radiata afforestation project in New Zealand. Monitoring carbon in conjunction with conventional forest inventory shows the highest return. Long-term average carbon accounting has lower accounting costs, compared to annual and 5 yearly accounting, as monitoring is only required every 5-10 years until the long-term average is attained. In this study we conclude that monitoring soil carbon stocks is not economically feasible using any of the accounting methods, when carbon is valued at US$ 10/t. This conclusion may be relevant to forest carbon sequestration projects elsewhere in the world and suggests care is needed in selecting the appropriate carbon monitoring options to avoid the risk that costs could be higher than any monetary benefits from terrestrial carbon sequestration. This would remove any commercial incentive to afforest for carbon sequestration reasons and severely limit the use of forest sinks as part of any package of measures addressing the ultimate objective of the UNFCCC

  17. URBAN SPRAWL MODELING, AIR QUALITY MONITORING AND RISK COMMUNICATION: THE NORTHEAST OHIO PROJECT

    Science.gov (United States)

    The Northeast Ohio Urban Sprawl, Air Quality Monitoring, and Communications Project (hereafter called the Northeast Ohio Project) provides local environmental and health information useful to residents, local officials, community planners, and others in a 15 county region in the ...

  18. Examination of the relationship between project management critical success factors and project success of oil and gas drilling projects

    Science.gov (United States)

    Alagba, Tonye J.

    Oil and gas drilling projects are the primary means by which oil companies recover large volumes of commercially available hydrocarbons from deep reservoirs. These types of projects are complex in nature, involving management of multiple stakeholder interfaces, multidisciplinary personnel, complex contractor relationships, and turbulent environmental and market conditions, necessitating the application of proven project management best practices and critical success factors (CSFs) to achieve success. Although there is some practitioner oriented literature on project management CSFs for drilling projects, none of these is based on empirical evidence, from research. In addition, the literature has reported alarming rates of oil and gas drilling project failure, which is attributable not to technical factors, but to failure of project management. The aim of this quantitative correlational study therefore, was to discover an empirically verified list of project management CSFs, which consistent application leads to successful implementation of oil and gas drilling projects. The study collected survey data online, from a random sample of 127 oil and gas drilling personnel who were members of LinkedIn's online community "Drilling Supervisors, Managers, and Engineers". The results of the study indicated that 10 project management factors are individually related to project success of oil and gas drilling projects. These 10 CSFs are namely; Project mission, Top management support, Project schedule/plan, Client consultation, Personnel, Technical tasks, Client acceptance, Monitoring and feedback, Communication, and Troubleshooting. In addition, the study found that the relationships between the 10 CSFs and drilling project success is unaffected by participant and project demographics---role of project personnel, and project location. The significance of these findings are both practical, and theoretical. Practically, application of an empirically verified CSFs list to oil

  19. Hanford Internal Dosimetry Project manual. Revision 1

    International Nuclear Information System (INIS)

    Carbaugh, E.H.; Bihl, D.E.; MacLellan, J.A.; Long, M.P.

    1994-07-01

    This document describes the Hanford Internal Dosimetry Project, as it is administered by Pacific Northwest Laboratory (PNL) in support of the US Department of Energy and its Hanford contractors. Project services include administrating the bioassay monitoring program, evaluating and documenting assessment of potential intakes and internal dose, ensuring that analytical laboratories conform to requirements, selecting and applying appropriate models and procedures for evaluating radionuclide deposition and the resulting dose, and technically guiding and supporting Hanford contractors in matters regarding internal dosimetry. Specific chapters deal with the following subjects: practices of the project, including interpretation of applicable DOE Orders, regulations, and guidance into criteria for assessment, documentation, and reporting of doses; assessment of internal dose, including summary explanations of when and how assessments are performed; recording and reporting practices for internal dose; selection of workers for bioassay monitoring and establishment of type and frequency of bioassay measurements; capability and scheduling of bioassay monitoring services; recommended dosimetry response to potential internal exposure incidents; quality control and quality assurance provisions of the program

  20. Hanford Internal Dosimetry Project manual. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Carbaugh, E.H.; Bihl, D.E.; MacLellan, J.A.; Long, M.P.

    1994-07-01

    This document describes the Hanford Internal Dosimetry Project, as it is administered by Pacific Northwest Laboratory (PNL) in support of the US Department of Energy and its Hanford contractors. Project services include administrating the bioassay monitoring program, evaluating and documenting assessment of potential intakes and internal dose, ensuring that analytical laboratories conform to requirements, selecting and applying appropriate models and procedures for evaluating radionuclide deposition and the resulting dose, and technically guiding and supporting Hanford contractors in matters regarding internal dosimetry. Specific chapters deal with the following subjects: practices of the project, including interpretation of applicable DOE Orders, regulations, and guidance into criteria for assessment, documentation, and reporting of doses; assessment of internal dose, including summary explanations of when and how assessments are performed; recording and reporting practices for internal dose; selection of workers for bioassay monitoring and establishment of type and frequency of bioassay measurements; capability and scheduling of bioassay monitoring services; recommended dosimetry response to potential internal exposure incidents; quality control and quality assurance provisions of the program.

  1. Penn West Energy Trust CO{sub 2} EOR storage monitoring project

    Energy Technology Data Exchange (ETDEWEB)

    Chalaturnyk, R. [Alberta Univ., Edmonton, AB (Canada)

    2007-07-01

    This presentation described Penn West Energy Trust's carbon dioxide (CO{sub 2}) enhanced oil recovery (EOR) storage monitoring project. The project formed part of a royalty credit program that offered a royalty reduction to energy companies as part of a plan to encourage the development of a CO{sub 2} storage industry in Alberta. The multi-agency project is expected to provide a better understanding of the fate of CO{sub 2} injected into petroleum reservoirs and the role that CO{sub 2} storage will play in reducing greenhouse gas (GHG) emissions. The project is located in a reservoir that had previously been waterflooded. High purity CO{sub 2} is injected through 2 directional wells. Data acquired from the field is used to provide information on baseline geology and hydrogeology, as well as to provide details of baseline leakages. Rock properties are investigated in order identify issues affecting rock strength. Geophysical monitoring is conducted to interpret baseline seismic profile datasets as well as to integrate active and passive survey analyses with geochemical characterization studies and reservoir models. The project is currently in the stage of developing a simulation model based on a comprehensive understanding of CO{sub 2} injection mechanisms. The model will be used to predict CO{sub 2} storage capacity and movement. refs., tabs., figs.

  2. A Case Study in Competitive Technical and Market Intelligence Support and Lessons Learned for the uChemLab LDRD Grand Challenge Project; TOPICAL

    International Nuclear Information System (INIS)

    SOUTHWELL, EDWIN T.; GARCIA, MARIE L.; MEYERS, CHARLES E.

    2001-01-01

    The(mu)ChemLab(trademark) Laboratory Directed Research and Development (LDRD) Grand Challenge project began in October 1996 and ended in September 2000. The technical managers of the(mu)ChemLab(trademark) project and the LDRD office, with the support of a consultant, conducted a competitive technical and market demand intelligence analysis of the(mu)ChemLab(trademark). The managers used this knowledge to make project decisions and course adjustments. CTI/MDI positively impacted the project's technology development, uncovered potential technology partnerships, and supported eventual industry partner contacts. CTI/MDI analysis is now seen as due diligence and the(mu)ChemLab(trademark) project is now the model for other Sandia LDRD Grand Challenge undertakings. This document describes the CTI/MDI analysis and captures the more important ''lessons learned'' of this Grand Challenge project, as reported by the project's management team

  3. Plan for Demonstration of Online Monitoring for the Light Water Reactor Sustainability Online Monitoring Project

    Energy Technology Data Exchange (ETDEWEB)

    Magdy S. Tawfik; Vivek Agarwal; Nancy J. Lybeck

    2011-09-01

    Condition based online monitoring technologies and development of diagnostic and prognostic methodologies have drawn tremendous interest in the nuclear industry. It has become important to identify and resolve problems with structures, systems, and components (SSCs) to ensure plant safety, efficiency, and immunity to accidents in the aging fleet of reactors. The Machine Condition Monitoring (MCM) test bed at INL will be used to demonstrate the effectiveness to advancement in online monitoring, sensors, diagnostic and prognostic technologies on a pilot-scale plant that mimics the hydraulics of a nuclear plant. As part of this research project, INL will research available prognostics architectures and their suitability for deployment in a nuclear power plant. In addition, INL will provide recommendation to improve the existing diagnostic and prognostic architectures based on the experimental analysis performed on the MCM test bed.

  4. Continuous, environmental radon monitoring program at the Yucca Mountain Site Characterization Project

    International Nuclear Information System (INIS)

    Liu, N.; Sorensen, C.D.; Tung, C.H.; Orchard, C.R.

    1995-01-01

    A continuous, environmental radon monitoring program has been established in support of the Department of Energy's (DOE) Yucca Mountain Site Characterization Project (YMP). The monitoring program is to characterize the natural radon emissions at the YMP site, to understand the existing radon concentrations in the environmental background, and to assess and control the potential work exposure. Based upon a study of the monitoring results, this paper presents a preliminary understanding of the magnitudes, characteristics, and exposure levels of radon at the YMP site

  5. Hanford environmental dose reconstruction project - an overview

    International Nuclear Information System (INIS)

    Shipler, D.B.; Napier, B.A.; Farris, W.T.

    1996-01-01

    The Hanford Environmental Dose Reconstruction Project was initiated because of public interest in the historical releases of radioactive materials from the Hanford Site, located in southcentral Washington State. By 1986, over 38,000 pages of environmental monitoring documentation from the early years of Hanford operations had been released. Special committees reviewing the documents recommended initiation of the Hanford Environmental Dose Reconstruction Project, which began in October 1987, and is conducted by Battelle, Pacific Northwest Laboratories. The technical approach taken was to reconstruct releases of radioactive materials based on facility operating information; develop and/or adapt transport, pathway, and dose models and computer codes; reconstruct environmental, meterological, and hydrological monitoring information; reconstruct demographic, agricultural, and lifestyle characteristics; apply statistical methods to all forms of uncertainty in the information, parameters, and models; and perform scientific investigation that were technically defensible. The geographic area for the study includes ∼2 x 10 5 km 2 (75,000 mi 2 ) in eastern Washington, western Idaho, and northeastern Oregon (essentially the Mid-columbia Basin of the Pacific Northwest). Three exposure pathways were considered: the atmosphere, the Columbia River, and ground water

  6. International remote monitoring project Argentina Nuclear Power Station Spent Fuel Transfer Remote Monitoring System

    International Nuclear Information System (INIS)

    Schneider, S.; Lucero, R.; Glidewell, D.

    1997-01-01

    The Autoridad Regulataria Nuclear (ARN) and the United States Department of Energy (DOE) are cooperating on the development of a Remote Monitoring System for nuclear nonproliferation efforts. A Remote Monitoring System for spent fuel transfer will be installed at the Argentina Nuclear Power Station in Embalse, Argentina. The system has been designed by Sandia National Laboratories (SNL), with Los Alamos National Laboratory (LANL) and Oak Ridge National Laboratory (ORNL) providing gamma and neutron sensors. This project will test and evaluate the fundamental design and implementation of the Remote Monitoring System in its application to regional and international safeguards efficiency. This paper provides a description of the monitoring system and its functions. The Remote Monitoring System consists of gamma and neutron radiation sensors, RF systems, and video systems integrated into a coherent functioning whole. All sensor data communicate over an Echelon LonWorks Network to a single data logger. The Neumann DCM 14 video module is integrated into the Remote Monitoring System. All sensor and image data are stored on a Data Acquisition System (DAS) and archived and reviewed on a Data and Image Review Station (DIRS). Conventional phone lines are used as the telecommunications link to transmit on-site collected data and images to remote locations. The data and images are authenticated before transmission. Data review stations will be installed at ARN in Buenos Aires, Argentina, ABACC in Rio De Janeiro, IAEA Headquarters in Vienna, and Sandia National Laboratories in Albuquerque, New Mexico. 2 refs., 2 figs

  7. Emergency monitoring strategy and radiation measurements. Working document of the NKS project emergency management and radiation monitoring in nuclear and radiological accidents (EMARAD)

    International Nuclear Information System (INIS)

    Lahtinen, J.

    2006-04-01

    This report is one of the deliverables of the NKS Project Emergency management and radiation monitoring in nuclear and radiological accidents (EMARAD) (20022005). The project and the overall results are briefly described in the NKS publication 'Emergency Management and Radiation Monitoring in Nuclear and Radiological Accidents. Summary Report on the NKS Project EMARAD' (NKS-137, April 2006). In a nuclear or radiological emergency, all radiation measurements must be performed efficiently and the results interpreted correctly in order to provide the decision-makers with adequate data needed in analysing the situation and carrying out countermeasures. Managing measurements in different situations in a proper way requires the existence of pre-prepared emergency monitoring strategies. Preparing a comprehensive yet versatile strategy is not an easy task to perform because there are lots of different factors that have to be taken into account. The primary objective of this study was to discuss the general problematics concerning emergency monitoring strategies and to describe a few important features of an efficient emergency monitoring system as well as factors affecting measurement activities in practise. Some information concerning the current situation in the Nordic countries has also been included. (au)

  8. Monitoring and optimization of thermal recovery wells at Nexen's Long Lake project

    Energy Technology Data Exchange (ETDEWEB)

    Furtado, S.; Howe, A.; Wozney, G.; Zaffar, S. [Nexen Inc. (Canada); Nelson, A. [Matrikon Inc. (Canada)

    2011-07-01

    The Long Lake project, operated by Nexen and situated in the Athabasca Oil Sands area in Alberta, Canada is a steam assisted gravity drainage scheme. In such thermal recovery processes, access to real time information is crucial. Nexen used specific tools to optimize monitoring in its Long Lake project and the aim of this paper is to present those customized well and facilities dashboards and reservoir trends. Real time and historical data on pressure, temperature injection and production rates are used in a Honeywell PHD Historian connected to a Delta-V DCS system to optimize recovery from the deposit. Results showed that these enhanced monitoring capabilities provided Nexen the ability to react rapidly to abnormal conditions, which resulted in significant financial benefits. The implementation of dashboard and reservoir trends in its Long Lake project helped Nexen to better monitor the reservoir and thus to optimize bitumen recovery.

  9. Hanford Environmental Dose Reconstruction Project, Quarterly report, September--November 1993

    International Nuclear Information System (INIS)

    Cannon, S.D.; Finch, S.M.

    1993-01-01

    The objective of the Hanford Environmental Dose Reconstruction (HEDR) Project is to estimate the radiation doses that individuals and populations could have received from nuclear operations at Hanford since 1944. The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed from release to impact on humans (dose estimates); Source Terms, Environmental Transport, Environmental Monitoring Data, Demography, Food Consumption, and Agriculture, and Environmental Pathways and Dose Estimates

  10. The History of the CONCAM Project: All Sky Monitors in the Digital Age

    Science.gov (United States)

    Nemiroff, Robert; Shamir, Lior; Pereira, Wellesley

    2018-01-01

    The CONtinuous CAMera (CONCAM) project, which ran from 2000 to (about) 2008, consisted of real-time, Internet-connected, fisheye cameras located at major astronomical observatories. At its peak, eleven CONCAMs around the globe monitored most of the night sky, most of the time. Initially designed to search for transients and stellar variability, CONCAMs gained initial notoriety as cloud monitors. As such, CONCAMs made -- and its successors continue to make -- ground-based astronomy more efficient. The original, compact, fisheye-observatory-in-a-suitcase design underwent several iterations, starting with CONCAM0 and with the last version dubbed CONCAM3. Although the CONCAM project itself concluded after centralized funding diminished, today more locally-operated, commercially-designed, CONCAM-like devices operate than ever before. It has even been shown that modern smartphones can operate in a CONCAM-like mode. It is speculated that the re-instatement of better global coordination of current wide-angle sky monitors could lead to better variability monitoring of the brightest stars and transients.

  11. NASA/DOD Aerospace Knowledge Diffusion Research Project. Report 15: Technical uncertainty and project complexity as correlates of information use by US industry-affiliated aerospace engineers and scientists: Results of an exploratory investigation

    Science.gov (United States)

    Pinelli, Thomas E.; Glassman, Nanci A.; Affelder, Linda O.; Hecht, Laura M.; Kennedy, John M.; Barclay, Rebecca O.

    1993-01-01

    An exploratory study was conducted that investigated the influence of technical uncertainty and project complexity on information use by U.S. industry-affiliated aerospace engineers and scientists. The study utilized survey research in the form of a self-administered mail questionnaire. U.S. aerospace engineers and scientists on the Society of Automotive Engineers (SAE) mailing list served as the study population. The adjusted response rate was 67 percent. The survey instrument is appendix C to this report. Statistically significant relationships were found to exist between technical uncertainty, project complexity, and information use. Statistically significant relationships were found to exist between technical uncertainty, project complexity, and the use of federally funded aerospace R&D. The results of this investigation are relevant to researchers investigating information-seeking behavior of aerospace engineers. They are also relevant to R&D managers and policy planners concerned with transferring the results of federally funded aerospace R&D to the U.S. aerospace industry.

  12. Amarillo National Resource Center for Plutonium. Quarterly technical progress report, May 1--July 31, 1998

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-09-01

    Progress is reported on research projects related to the following: Electronic resource library; Environment, safety, and health; Communication, education, training, and community involvement; Nuclear and other materials; and Reporting, evaluation, monitoring, and administration. Technical studies investigate remedial action of high explosives-contaminated lands, radioactive waste management, nondestructive assay methods, and plutonium processing, handling, and storage.

  13. Challenge Study: A Project-Based Learning on a Wireless Communication System at Technical High School

    Science.gov (United States)

    Terasawa, Ikuo

    2016-01-01

    The challenge study is a project based learning curriculum at Technical High School aimed at the construction of a wireless communication system. The first period was engineering issues in the construction of an artificial satellite and the second period was a positional locating system based on the general purpose wire-less device--ZigBee device.…

  14. Construction safety monitoring based on the project's characteristic with fuzzy logic approach

    Science.gov (United States)

    Winanda, Lila Ayu Ratna; Adi, Trijoko Wahyu; Anwar, Nadjadji; Wahyuni, Febriana Santi

    2017-11-01

    Construction workers accident is the highest number compared with other industries and falls are the main cause of fatal and serious injuries in high rise projects. Generally, construction workers accidents are caused by unsafe act and unsafe condition that can occur separately or together, thus a safety monitoring system based on influencing factors is needed to achieve zero accident in construction industry. The dynamic characteristic in construction causes high mobility for workers while doing the task, so it requires a continuously monitoring system to detect unsafe condition and to protect workers from potential hazards. In accordance with the unique nature of project, fuzzy logic approach is one of the appropriate methods for workers safety monitoring on site. In this study, the focus of discussion is based on the characteristic of construction projects in analyzing "potential hazard" and the "protection planning" to be used in accident prevention. The data have been collected from literature review, expert opinion and institution of safety and health. This data used to determine hazard identification. Then, an application model is created using Delphi programming. The process in fuzzy is divided into fuzzification, inference and defuzzification, according to the data collection. Then, the input and final output data are given back to the expert for assessment as a validation of application model. The result of the study showed that the potential hazard of construction workers accident could be analysed based on characteristic of project and protection system on site and fuzzy logic approach can be used for construction workers accident analysis. Based on case study and the feedback assessment from expert, it showed that the application model can be used as one of the safety monitoring tools.

  15. Drafting a monitoring plan for the ROAD project under the EU CCS directive

    NARCIS (Netherlands)

    Steegs, T.P.H.; Neelse, F.P.; Gittins, C.; Ros, M.

    2014-01-01

    The Rotterdam Capture and Storage Demonstration Project (ROAD) is an integrated CCS project in the Netherlands that has recently completed the storage permitting process. Development of the monitoring and contingency plans is a key component of this process. Our paper discusses the development of

  16. Sniffer project development

    CERN Document Server

    Grau, S; CERN. Geneva. ST Division

    2002-01-01

    To ensure the safety of the personnel, and prevent major damage to the equipment in the LHC experiments, a combined fire and gas detection system is being developed in conjunction with the industry. This system named SNIFFER, shall detect fire, flammable gas leaks and oxygen deficiency. In addition it shall interface with the Experiments' Control System and the CERN Safety Alarm Monitoring system. The SNIFFER project is currently at the end of the prototyping phase, and the technical specification is being written for the outsourcing of the system. The purpose of this document is to describe the main functions, constraints and interfaces of the system, to present the status report and planning of the project, and to explain the preliminary conclusions of the prototyping phase.

  17. Environmental monitoring for the DOE coolside and LIMB demonstration extension projects

    International Nuclear Information System (INIS)

    White, T.; Contos, L.

    1991-09-01

    The purpose of this document is to present environmental monitoring data collected during the US Department of Energy Limestone Injection Multistage Burner (DOE LIMB) Demonstration Project Extension at the Ohio Edison Edgewater Generating Station in Lorain, Ohio. These data were collected by implementing the Environmental Monitoring Plan (EMP) for the DOE LIMB Demonstration Project Extension, dated August 1988. This document is the fifth EMP status report to be published and presents the data generated during November and December 1990, and January 1991. These reports review a three or four month period and have been published since the project's start in October 1989. The DOE project is an extension of the US Environmental Protection Agency's (EPA) original LIMB Demonstration. The program is operated under DOE's Clean Coal Technology Program of ''emerging clean coal technologies'' under the categories of ''in boiler control of oxides of sulfur and nitrogen'' as well as ''post-combustion clean-up.'' The objective of the LIMB program is to demonstrate the sulfur dioxide (SO 2 ) and nitrogen oxide (NO x ) emission reduction capabilities of the LIMB system. The LIMB system is a retrofit technology to be used for existing coal-fired boilers equipped with electrostatic precipitators (ESPs). 5 figs., 12 tabs

  18. Geothermal direct-heat utilization assistance: Federal assistance program. Quarterly project progress report, October--December 1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-02-01

    The report summarizes geothermal technical assistance, R&D and technology transfer activities of the Geo-Heat Center at Oregon Institute of Technology for the first quarter of FY-96. It describes 90 contacts with parties during this period related to technical assistance with geothermal direct heat projects. Areas dealt with include geothermal heat pumps, space heating, greenhouses, aquaculture, equipment and resources. Research activities are summarized on low-temperature resource assessment, geothermal district heating system cost evaluation and silica waste utilization project. Outreach activities include the publication of a geothermal direct use Bulletin, dissemination of information, geothermal library, technical papers and seminars, development of a webpage, and progress monitor reports on geothermal resources and utilization.

  19. Engineering Technical Review Planning Briefing

    Science.gov (United States)

    Gardner, Terrie

    2012-01-01

    The general topics covered in the engineering technical planning briefing are 1) overviews of NASA, Marshall Space Flight Center (MSFC), and Engineering, 2) the NASA Systems Engineering(SE) Engine and its implementation , 3) the NASA Project Life Cycle, 4) MSFC Technical Management Branch Services in relation to the SE Engine and the Project Life Cycle , 5) Technical Reviews, 6) NASA Human Factor Design Guidance , and 7) the MSFC Human Factors Team. The engineering technical review portion of the presentation is the primary focus of the overall presentation and will address the definition of a design review, execution guidance, the essential stages of a technical review, and the overall review planning life cycle. Examples of a technical review plan content, review approaches, review schedules, and the review process will be provided and discussed. The human factors portion of the presentation will focus on the NASA guidance for human factors. Human factors definition, categories, design guidance, and human factor specialist roles will be addressed. In addition, the NASA Systems Engineering Engine description, definition, and application will be reviewed as background leading into the NASA Project Life Cycle Overview and technical review planning discussion.

  20. Yakima Habitat Improvement Project Master Plan, Technical Report 2003.

    Energy Technology Data Exchange (ETDEWEB)

    Golder Associates, Inc.

    2003-04-22

    result of the planning effort leading to this Master Plan, a Technical Working Group (TWG) was established that represents most, if not all, fish and wildlife agencies/interests in the subbasin. This TWG met regularly throughout the planning process to provide input and review and was instrumental in the development of this plan. Preparation of this plan included the development of a quantitative prioritization process to rank 40,000 parcels within the Urban Growth Area based on the value of fish and wildlife habitat each parcel provided. Biological and physical criteria were developed and applied to all parcels through a GIS-based prioritization model. In the second-phase of the prioritization process, the TWG provided local expert knowledge and review of the properties. In selecting the most critical areas within the Urban Growth Area for protection, this project assessed the value of fish and wildlife habitat on the Yakima River. Well-developed habitat acquisition efforts (e.g., Yakima River Basin Water Enhancement Project by the Bureau of Reclamation and Yakama Nation acquisition projects) are already underway on the Yakima River mainstem. These efforts, however, face several limitations in protection of floodplain function that could be addressed through the support of the Yakima Habitat Improvement Project. This Master Plan integrates tributary habitat acquisition efforts with those ongoing on the Yakima River to best benefit fish and wildlife in the Urban Growth Area. The parcel ranking process identified 25 properties with the highest fish and wildlife value for habitat acquisition in the Yakima Urban Area. These parcels contain important fish and wildlife corridors on Ahtanum and Wide Hollow Creeks and the Naches River. The fifteen highest-ranking parcels of the 25 parcels identified were considered very high priority for protection of fish and wildlife habitat. These 15 parcels were subsequently grouped into four priority acquisition areas. This Master Plan

  1. 'Advancement of KHPS to DOE TRL 7/8' Project - Final Technical Report

    Energy Technology Data Exchange (ETDEWEB)

    Adonizio, Mary Ann [Verdant Power Inc., New York, NY (United States); Corren, Dean [Verdant Power Inc., New York, NY (United States); Smith, Ron [Verdant Power Inc., New York, NY (United States); Colby, Jonathan [Verdant Power Inc., New York, NY (United States); Hernandez, Aaron [Verdant Power Inc., New York, NY (United States)

    2016-04-08

    Final Report describing activities performed under the 'Advancement of the KHPS to DOE TRL 7/8' project, including the development of critical component test protocols, testing and analysis of the Gen5 KHPS main shaft seal, and continuing compliance work on approved operational environmental monitoring plans in anticipation of KHPS turbine installation at Verdant Power's Roosevelt Island Tidal Energy (RITE) Project site in New York, NY.

  2. 1982 environmental-monitoring program report for the West Valley Demonstration Project site

    International Nuclear Information System (INIS)

    1983-05-01

    This report is prepared and submitted in accordance with the requirements of DOE Order 5484.1 and presents environmental monitoring program data collected at the West Valley Demonstration Project (WVDP) site from February 26, 1982, through December 31, 1982. The WVDP objective is to solidify approximately 600,000 gallons of high-level liquid radioactive waste stored at the former Nuclear Fuel Services reprocessing facility at West Valley, New York. Nuclear Fuel Services conducted an environmental monitoring program in accordance with Nuclear Regulatory Commission requirements which were appropriate for shutdown maintenance operations conducted at the site. That program was embraced by West Valley Nuclear Services Company (WVNS) at the time of transition (February 26, 1982) and will be modified to provide a comprehensive monitoring program in preparation for waste solidification operations scheduled for startup in June 1988. As such, the data presented in this report is considered preoperational in nature in accordance with DOE Order 5484.1, Chapter III, Paragraph 1. The environmental monitoring program planned for the operating phase of the project will be fully implemented by fiscal year 1985 and will provide at least two years of preoperational data prior to startup

  3. Technical data for concentrated solar power plants in operation, under construction and in project

    Directory of Open Access Journals (Sweden)

    Ugo Pelay

    2017-08-01

    Full Text Available This article presents technical data for concentrated solar power (CSP plants in operation, under construction and in project all over the world in the form of tables. These tables provide information about plants (e.g., name of the CSP plant, country of construction, owner of the plant, aim of the plant and their technical characteristics (e.g., CSP technology, solar power, area of the plant, presence and type of hybridization system, electricity cost, presence and type of TES, power cycle fluid, heat transfer fluid, operating temperature, operating pressure, type of turbine, type and duration of storage, etc.. Further interpretation of the data and discussions on the current state-of-the-art and future trends of CSP can be found in the associated research article (Pelay et al., 2017 [1].

  4. Final Technical Report

    Energy Technology Data Exchange (ETDEWEB)

    Glasser, Alan H. [Fusion Theory and Computation Inc., Kingston, WA (United States)

    2018-02-02

    Final technical report on DE-SC0016106. This is the final technical report for a portion of the multi-institutional CEMM project. This report is centered around 3 publications and a seminar presentation, which have been submitted to E-Link.

  5. UMTRA project water sampling and analysis plan, Maybell, Colorado

    International Nuclear Information System (INIS)

    1994-06-01

    This water sampling and analysis plan (WSAP) describes planned water sampling activities and provides the regulatory and technical basis for ground water sampling in 1994 at the US Department of Energy's (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project site in Maybell, Colorado. The WSAP identifies and justifies sampling locations, analytical parameters, and sampling frequencies at the site. The ground water data will be used for site characterization and risk assessment. The regulatory basis for the ground water and surface water monitoring activities is derived from the EPA regulations in 40 CFR Part 192 (1993) and the proposed EPA standards of 1987 (52 FR 36000). Sampling procedures are guided by the UMTRA Project standard operating procedures (SOP) (JEG, n.d.), the Technical Approach Document (TAD) (DOE, 1989), and the most effective technical approach for the site. This WSAP also includes a summary and the results of water sampling activities from 1989 through 1992 (no sampling was performed in 1993)

  6. Technical specifications for monitoring Community trends in zoonotic agents in foodstuffs and animal populations on request from EFSA

    DEFF Research Database (Denmark)

    Borck Høg, Birgitte; Chriél, Mariann; Korsgaard, Helle

    of criteria for the selection of the zoonotic agent/animal or food category combinations where trend analyses would be justified. Based on data available from 2004 to 2007, the following combinations are suggested for trend analyses: Salmonella in fresh broiler and pig meat, flocks of laying hens and broilers......Technical specifications are proposed for the monitoring of temporal trends in zoonotic agents in animal and food populations at Community or Member State group level in the framework of Directive 2003/99/EC. Two types of trend monitoring are identified: trend watching, which covers general...

  7. Manual on SFR R and D and Technology Monitoring System Based on Enterprise Project Management Solution

    International Nuclear Information System (INIS)

    Lee, Dong Uk; Lee, Yong Bum; Won, Byung Chool; Kim, Young In; Hahn, Do Hee

    2008-04-01

    This report is a manual on enterprise project management solution for R and D and technology monitoring system that is applicable for managing the generation IV sodium-cooled fast reactor development. The prime goal of this system is to provide project manager with reliable and accurate information of status of progress, performance and resource allocation, and attain traceability and visibility of project implementation for effective project management. This report is composed of the three part. The first part is an introduction on microsoft project professional software that was used to monitor the progress, evaluate the results and analyze the resource distribution of the activities. The second makes a description of project plan and control, and the third part describes on collaboration and teamwork

  8. Manual on SFR R and D and Technology Monitoring System Based on Enterprise Project Management Solution

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Dong Uk; Lee, Yong Bum; Won, Byung Chool; Kim, Young In; Hahn, Do Hee

    2008-04-15

    This report is a manual on enterprise project management solution for R and D and technology monitoring system that is applicable for managing the generation IV sodium-cooled fast reactor development. The prime goal of this system is to provide project manager with reliable and accurate information of status of progress, performance and resource allocation, and attain traceability and visibility of project implementation for effective project management. This report is composed of the three part. The first part is an introduction on microsoft project professional software that was used to monitor the progress, evaluate the results and analyze the resource distribution of the activities. The second makes a description of project plan and control, and the third part describes on collaboration and teamwork.

  9. Microseismic monitoring during Hydraulic stimulation in Pohang (Korea) for EGS pilot project

    Science.gov (United States)

    Kim, M.; Yoon, B.; Lee, C.; Park, K. G.; Yoon, W. S.; Song, Y.; Lee, T. J.

    2017-12-01

    Since the geothermal anomaly in the Pohang area has been reported in 1960s, various geological and geophysical surveys have been conducted by Korea Institute of Geoscience and Mineral Resources (KIGAM) including gravity, seismic, airborne magnetic and magneto-telluric surveys. Based on these explorations, the Enhanced Geothermal System (EGS) pilot project has been carried out in Pohang since the end of 2010. One vertical well (PX-2, MD 4,348 m) and one deviated well (PX-1, MD 4,362 m) have been drilled in granite rock for the EGS. Microseismic (MS) monitoring is the best way to understand how the fracture grows during the hydraulic stimulation. KIGAM has set up 9 shallow borehole stations (100-130 m), 4 surface stations and two borehole geophones (1,350 and 1,550 m deep) within 5 km radius from injection well for the MS monitoring during hydraulic stimulation. The first hydraulic stimulation started on January 29th to February 20th, 2016 at PX-2 and the second stimulation was conducted in PX-1 from December 15th, 2016 to January 11th, 2017. Several hundreds of MS events occurred during stimulation and the biggest event was ML 2.3 during the shut in period of the second stimulation. Based on the results of the MS monitoring, a soft stimulation is scheduled at PX-1 in cooperation with one of the European Horizon2020 project, DESTRESS (Demonstration of soft stimulation treatments of geothermal reservoirs). We will present the MS monitoring system in Pohang and the data of the stimulation with the MS monitoring results. We believe that the data from Pohang will improve the understanding of seismic behavior due to hydraulic stimulation in crystalline rocks and also will contribute to success of the Pohang EGS project.

  10. An overview of the Environmental Monitoring Computer Automation Project

    International Nuclear Information System (INIS)

    Johnson, S.M.; Lorenz, R.

    1992-01-01

    The Savannah River Site (SRS) was bulk to produce plutonium and tritium for national defense. As a result of site operations, routine and accidental releases of radionuclides have occurred. The effects these releases have on the k>cal population and environment are of concern to the Department of Energy (DOE) and SRS personnel. Each year, approximately 40,000 environmental samples are collected. The quality of the samples, analytical methods and results obtained are important to site personnel. The Environmental Monitoring Computer Automation Project (EMCAP) was developed to better manage scheduling, log-in, tracking, analytical results, and report generation. EMCAP can be viewed as a custom Laboratory Information Management System (LIMS) with the ability to schedule samples, generate reports, and query data. The purpose of this paper is to give an overview of the SRS environmental monitoring program, describe the development of EMCAP software and hardware, discuss the different software modules, show how EMCAP improved the Environmental Monitoring Section program, and examine the future of EMCAP at SRS

  11. The Transit Monitoring in the South (TraMoS project

    Directory of Open Access Journals (Sweden)

    López-Morales Mercedes

    2013-04-01

    Full Text Available We present the Transit Monitoring in the South (TraMoS project. TraMoS has monitored transits of 30 exoplanets with telescopes located in Chile since 2008, whit the following goals: (1 to refine the physical and/or orbital parameters of those exoplanet system, and (2 to search for variations in the mid-times of the transits and in other parameters such as orbital inclination or transit's depth, that could indicate the presence of additional bodies in the system. We highlight here the first results of TraMoS in three selected exoplanets.

  12. Financing of Chamera project

    International Nuclear Information System (INIS)

    Jain, A.K.; Chakraborty, D.K.

    1994-01-01

    Chamera Hydroelectric Project was selected by National Hydroelectric Power Corporation (NHPC) as a pilot project for accelerated development of hydro-power in the country. This project was considered to have certain distinct specialties from different aspects in comparison with other projects. In the first place, the field investigation for the project was completed in a record time of only eight months by deploying the most modern techniques. Secondly, Chamera was the first NHPC project with external aid both technically and financially. The third and most important of all the specialties was in the planned reduction of construction period to 6 years from the original estimate of 8 years. Such reduction of gestation period was considered to be the direct outcome of modern method of management, monitoring and improved imported technology. The investment decision in the project was taken in April '84 with an estimated cost of energy at busbar 44.12 paise/unit exclusive of return on equity capital and royalty payable to the home state. The all inclusive rate of power was estimated 75.86 paise/unit. (author). 4 tabs

  13. Optimizing Seismic Monitoring Networks for EGS and Conventional Geothermal Projects

    Science.gov (United States)

    Kraft, Toni; Herrmann, Marcus; Bethmann, Falko; Stefan, Wiemer

    2013-04-01

    In the past several years, geological energy technologies receive growing attention and have been initiated in or close to urban areas. Some of these technologies involve injecting fluids into the subsurface (e.g., oil and gas development, waste disposal, and geothermal energy development) and have been found or suspected to cause small to moderate sized earthquakes. These earthquakes, which may have gone unnoticed in the past when they occurred in remote sparsely populated areas, are now posing a considerable risk for the public acceptance of these technologies in urban areas. The permanent termination of the EGS project in Basel, Switzerland after a number of induced ML~3 (minor) earthquakes in 2006 is one prominent example. It is therefore essential for the future development and success of these geological energy technologies to develop strategies for managing induced seismicity and keeping the size of induced earthquakes at a level that is acceptable to all stakeholders. Most guidelines and recommendations on induced seismicity published since the 1970ies conclude that an indispensable component of such a strategy is the establishment of seismic monitoring in an early stage of a project. This is because an appropriate seismic monitoring is the only way to detect and locate induced microearthquakes with sufficient certainty to develop an understanding of the seismic and geomechanical response of the reservoir to the geotechnical operation. In addition, seismic monitoring lays the foundation for the establishment of advanced traffic light systems and is therefore an important confidence building measure towards the local population and authorities. We have developed an optimization algorithm for seismic monitoring networks in urban areas that allows to design and evaluate seismic network geometries for arbitrary geotechnical operation layouts. The algorithm is based on the D-optimal experimental design that aims to minimize the error ellipsoid of the linearized

  14. Geothermal direct-heat utilization assistance. Quarterly project progress report, April--June 1993

    Energy Technology Data Exchange (ETDEWEB)

    Lienau, P.

    1993-06-01

    Technical assistance was provided to 60 requests from 19 states. R&D progress is reported on: evaluation of lineshaft turbine pump problems, geothermal district heating marketing strategy, and greenhouse peaking analysis. Two presentations and one tour were conducted, and three technical papers were prepared. The Geothermal Progress Monitor reported: USGS Forum on Mineral Resources, Renewable Energy Tax Credits Not Working as Congress Intended, Geothermal Industry Tells House Panel, Newberry Pilot Project, and Low-Temperature Geothermal Resources in Nevada.

  15. Large-scale building integrated photovoltaics field trial. First technical report - installation phase

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2004-07-01

    This report summarises the results of the first eighteen months of the Large-Scale Building Integrated Photovoltaic Field Trial focussing on technical aspects. The project aims included increasing awareness and application of the technology, raising the UK capabilities in application of the technology, and assessing the potential for building integrated photovoltaics (BIPV). Details are given of technology choices; project organisation, cost, and status; and the evaluation criteria. Installations of BIPV described include University buildings, commercial centres, and a sports stadium, wildlife park, church hall, and district council building. Lessons learnt are discussed, and a further report covering monitoring aspects is planned.

  16. TRManager – Technical Risk Manager

    Directory of Open Access Journals (Sweden)

    Mark A. Gregory

    2009-06-01

    Full Text Available This paper presents research into the development of a new information management technique called Technical Risk Manager. Project management involves the use of processes and information management techniques to aid decision making in the pursuit of project success. Project success may be achieved by meeting time, cost or performance criteria. Current project management practices focus on achieving time and cost project success criteria by using three information management techniques developed in the 1950s: Gantt, PERT and Critical Path Method. Technical Risk Manager has been developed to provide an information management technique that may be used to aid project management decision making in the pursuit of achieving the performance project success criteria.

  17. The Development of K-8 Progress Monitoring Measures in Mathematics for Use with the 2% and General Education Populations: Kindergarten. Technical Report # 0921

    Science.gov (United States)

    Alonzo, Julie; Tindal, Gerald

    2009-01-01

    In this technical report, we describe the development and piloting of a series of mathematics progress monitoring measures intended for use with students in kindergarten. These measures, available as part of easyCBM[TM], an online progress monitoring assessment system, were developed in 2008 and administered to approximately 2800 students from…

  18. ECUT (Energy Conversion and Utilization Technologies) program: Biocatalysis project

    Science.gov (United States)

    Baresi, Larry

    1989-03-01

    The Annual Report presents the fiscal year (FY) 1988 research activities and accomplishments, for the Biocatalysis Project of the U.S. Department of Energy, Energy Conversion and Utilization Technologies (ECUT) Division. The ECUT Biocatalysis Project is managed by the Jet Propulsion Laboratory, California Institute of Technology. The Biocatalysis Project is a mission-oriented, applied research and exploratory development activity directed toward resolution of the major generic technical barriers that impede the development of biologically catalyzed commercial chemical production. The approach toward achieving project objectives involves an integrated participation of universities, industrial companies and government research laboratories. The Project's technical activities were organized into three work elements: (1) The Molecular Modeling and Applied Genetics work element includes research on modeling of biological systems, developing rigorous methods for the prediction of three-dimensional (tertiary) protein structure from the amino acid sequence (primary structure) for designing new biocatalysis, defining kinetic models of biocatalyst reactivity, and developing genetically engineered solutions to the generic technical barriers that preclude widespread application of biocatalysis. (2) The Bioprocess Engineering work element supports efforts in novel bioreactor concepts that are likely to lead to substantially higher levels of reactor productivity, product yields and lower separation energetics. Results of work within this work element will be used to establish the technical feasibility of critical bioprocess monitoring and control subsystems. (3) The Bioprocess Design and Assessment work element attempts to develop procedures (via user-friendly computer software) for assessing the energy-economics of biocatalyzed chemical production processes, and initiation of technology transfer for advanced bioprocesses.

  19. Supplement to the UMTRA Project water sampling and analysis plan, Monument Valley, Arizona

    International Nuclear Information System (INIS)

    1995-09-01

    This water sampling and analysis plan (WSAP) supplement supports the regulatory and technical basis for water sampling at the Riverton, Wyoming, Uranium Mill Tailings Remedial Action (UMTRA) Project site, as defined in the 1994 WSAP document for Riverton (DOE, 1994). Further, the supplement serves to confirm the Project's present understanding of the site relative to the hydrogeology and contaminant distribution as well as the intent to continue to use the sampling strategy as presented in the 1994 WSAP document for Riverton. Ground water and surface water monitoring activities are derived from the US Environmental Protection Agency regulations in 40 CFR Part 192 and 60 FR 2854. Sampling procedures are guided by the UMTRA Project standard operating procedures (JEG, n.d.), the Technical Approach Document (DOE, 1989), and the most effective technical approach for the site. Additional site-specific documents relevant to the Riverton site are the Riverton Baseline Risk Assessment (BLRA) (DOE, 1995a) and the Riverton Site Observational Work Plan (SOWP) (DOE, 1995b)

  20. Telemetry system for monitoring the ECG for patients with high cardiovascular risk. Main design requirements and technical solutions

    International Nuclear Information System (INIS)

    Rodriguez, J; Meissimilly, G; Berovides, JD

    2005-01-01

    In this paper the main design requirements concerning the setting up of a telemetry ECG monitoring system are presented. The design's most important technical solutions as well as some details are also discussed. This system is intended to provide skilled medical assistance during the cardiac rehabilitation of both asymptomatic and high risk coronary patients

  1. Project monitoring and evaluation: an enhancing method for health research system management

    Directory of Open Access Journals (Sweden)

    Shirin Djalalinia

    2014-01-01

    Conclusions: We concluded that; although monitoring and evaluation as an essential part of HRS Management light the improvement ahead way but we still need to advantage of the new project management advances.

  2. Tribal Colleges and Universities/American Indian Research and Education Initiatives Advanced Manufacturing Technical Assistance Project

    Energy Technology Data Exchange (ETDEWEB)

    Atcitty, Stanley [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2017-02-01

    The overall goal of this project is to establish a network of TCUs with essential advanced manufacturing (AM) facilities, associated training and education programs, and private sector and federal agency partnerships to both prepare an American Indian AM workforce and create economic and employment opportunities within Tribal communities through design, manufacturing, and marketing of high quality products. Some examples of high quality products involve next generation grid components such as mechanical energy storage, cabling for distribution of energy, and electrochemical energy storage enclosures. Sandia National Laboratories (Sandia) is tasked to provide technical advising, planning, and academic program development support for the TCU/American Indian Higher Education Consortium (AIHEC) Advanced Manufacturing Project. The TCUs include Bay Mills Community College (BMCC), Cankdeska Cikana Community College (CCCC), Navajo Technical University (NTU), Southwestern Indian Polytechnic Institute (SIPI), and Salish Kooteani College. AIHEC and Sandia, with collaboration from SIPI, will be establishing an 8-week summer institute on the SIPI campus during the summer of 2017. Up to 20 students from TCUs are anticipated to take part in the summer program. The goal of the program is to bring AM science, technology, engineering, and mathematics (STEM) awareness and opportunities for the American Indian students. Prior to the summer institute, Sandia will be providing reviews on curriculum plans at the each of the TCUs to ensure the content is consistent with current AM design and engineering practice. In addition, Sandia will provide technical assistance to each of the TCUs in regards to their current AM activities.

  3. Integrating a project monitoring system into a public health network: experiences from Alive & Thrive Vietnam.

    Science.gov (United States)

    Tuan, Nguyen Thanh; Alayon, Silvia; Do, Tran Thanh; Ngan, Tran Thi; Hajeebhoy, Nemat

    2015-01-01

    Little information is available about how to build a monitoring system to measure the output of preventive nutrition interventions, such as counselling on infant and young child feeding. This paper describes the Alive & Thrive Vietnam (A&T) project experience in nesting a large-scale project monitoring system into the existing public health information system (e.g. using the system and resources), and in using monitoring data to strengthen service delivery in 15 provinces with A&T franchises. From January 2012 to April 2014, the 780 A&T franchises provided 1,700,000 counselling contacts (~3/4 by commune franchises). In commune franchises in April 2014, 80% of mothers who were pregnant or with children under two years old had been to the counselling service at least one time, and 87% of clients had been to the service earlier. Monitoring data are used to track the progress of the project, make decisions, provide background for a costing study and advocate for the integration of nutrition counselling indicators into the health information system nationwide. With careful attention to the needs of stakeholders at multiple levels, clear data quality assurance measures and strategic feedback mechanisms, it is feasible to monitor the scale-up of nutrition programmes through the existing routine health information system.

  4. The Vehicle Integrated Performance Analysis Experience: Reconnecting With Technical Integration

    Science.gov (United States)

    McGhee, D. S.

    2006-01-01

    Very early in the Space Launch Initiative program, a small team of engineers at MSFC proposed a process for performing system-level assessments of a launch vehicle. Aimed primarily at providing insight and making NASA a smart buyer, the Vehicle Integrated Performance Analysis (VIPA) team was created. The difference between the VIPA effort and previous integration attempts is that VIPA a process using experienced people from various disciplines, which focuses them on a technically integrated assessment. The foundations of VIPA s process are described. The VIPA team also recognized the need to target early detailed analysis toward identifying significant systems issues. This process is driven by the T-model for technical integration. VIPA s approach to performing system-level technical integration is discussed in detail. The VIPA process significantly enhances the development and monitoring of realizable project requirements. VIPA s assessment validates the concept s stated performance, identifies significant issues either with the concept or the requirements, and then reintegrates these issues to determine impacts. This process is discussed along with a description of how it may be integrated into a program s insight and review process. The VIPA process has gained favor with both engineering and project organizations for being responsive and insightful

  5. A model technical cooperation project on the marine radioactivity assessment in the Black Sea Region

    International Nuclear Information System (INIS)

    Goektepe, B. G.; Koeksal, G.; Osvath, I.; Koese, A.; Kuecuekcezzar, R.; Varinlioglu, A.; Guengoer, E.

    2002-01-01

    Marine Environmental Assessment of the Black Sea Region is a wide scope Regional Technical Co-operation Project coded as RER/2/003 implemented by the International Atomic Energy Agency (IAEA) in the period 1995-2001.This multidisciplinay project was designed in response to the needs of participating Member States - the six Black Sea coastal countries (Bulgaria, Romania, Ukraine, Russian Federation, Georgia and Turkey)- to establish capabilities for reliably assessing radionuclides in the Black Sea environment and applying tracer techniques to marine pollution studies. The IAEA assisted laboratories in the region by providing expert services, training, equipment and materials (Goektepe et al., 1998; Osvath et al., 1997-2000)

  6. Radiation tolerance assurance of technical equipment in the LHC radiation monitoring for technical equipment at the LHC

    CERN Document Server

    Wijnands, Thijs; CERN. Geneva. TS Department

    2005-01-01

    In contrast with other accelerators at CERN, a large amount of technical equipment will be located in the LHC tunnel, the underground areas and in the experimental caverns where they will be exposed to radiation. Nearly all this equipment makes, to a certain extent, use of commercial microelectronics which is extremely sensitive to radiation damage, both instantaneous damage and cumulative damage. Examples in the TS Department are the electronics for the position sensors of the low beta quadrupoles, the access system, the cooling and ventilation units, the electronics for the electrical distribution, the oxygen deficiency monitors and fire detection systems. The basic effects of radiation on electronic systems and components are well understood because similar problems with radiation are encountered in the aerospace and aviation industry. Since 1998, an efficient and original Radiation Tolerance Assurance approach for the LHC machine has been established. Its aim is to minimise the effects of radiation damage...

  7. Statistical analysis of real-time, enviromental radon monitoring results at the Fernald Enviromental Management Project

    International Nuclear Information System (INIS)

    Liu, Ning; Spitz, H.B.; Tomezak, L.

    1996-01-01

    A comprehensive real-time, environmental radon monitoring program is being conducted at the Fernald Environmental Management Project, where a large quantity of radium-bearing residues have been stored in two covered earth-bermed silos. Statistical analyses was conducted to determine what impact radon emitted by the radium bearing materials contained in the silos has on the ambient radon concentration at the Fernald Environmental Management Project site. The distribution that best describes the outdoor radon monitoring data was determined before statistical analyses were conducted. Random effects associated with the selection of radon monitoring locations were accommodated by using nested and nested factorial classification models. The Project site was divided into four general areas according to their characteristics and functions: (1) the silo area, where the radium-bearing waste is stored; (2) the production/administration area; (3) the perimeter area, or fence-line, of the Fernald Environmental Management Project site; and (4) a background area, located approximately 13 km from the Fernald Environmental Management Project site, representing the naturally-occurring radon concentration. A total of 15 continuous, hourly readout radon monitors were installed to measure the outdoor radon concentration. Measurement results from each individual monitor were found to be log-normally distributed. A series of contrast tests, which take random effects into account, were performed to compare the radon concentration between different areas of the site. These comparisons demonstrate that the radon concentrations in the production/administration area and the perimeter area are statistically equal to the natural background, whereas the silo area is significantly higher than background. The study also showed that the radon concentration in the silo area was significantly reduced after a sealant barrier was applied to the contents of the silos. 10 refs., 6 figs., 8 tabs

  8. Meteorological monitoring system of TÜBİTAK National Observatory

    Science.gov (United States)

    Koçak, M.; Selam, S. O.; Keskn, V.

    2004-10-01

    A custom meteorological monitoring system was constructed to reliably monitor the meteorological parameters of the site of TÜBİTAK National Observatory (TÜBİTAK: The Scientific and Technical Research Council of Turkey). The site is located on a mountain top known as Bakırlıtepe about 50 km west of the Antalya City at a height of 2547m. The system has software (C-based data acquisition/archiving structure and PHP based WEB monitoring support) and micro-controller based control electronics, fiber based custom designed encoder sensors (for wind speed and direction) and transmission lines using fiberoptic to RS232 transcievers. The constructed system can be used in any robotic telescope project for data monitoring and alert system creation.

  9. ATEE Interactive Co-ordination and Educational Monitoring of Socrates Comenius Action 3 Projects.

    Science.gov (United States)

    Libotton, Arno; Van Braak, Johan; Garofalo, Mara

    2002-01-01

    Asserts that although the Comenius Action 3 courses were well-accepted and high quality, there is a need for a structure for easily monitoring and evaluating these projects. This article presents a pilot project designed with this purpose, which may be useful in implementing a system of coordination and communication among the different projects…

  10. Technical Area V (TA-V) transformation project close-out report.

    Energy Technology Data Exchange (ETDEWEB)

    2010-07-01

    Sandia National Laboratories (SNL) Technical Area V (TA-V) has provided unique nuclear experimental environments for decades. The technologies tested in TA-V facilities have furthered the United States Nuclear Weapons program and has contributed to the national energy and homeland security mission. The importance of TA-V working efficiently to produce an attractive and effective platform for experiments should not be underestimated. Throughout its brief history, TA-V has evolved to address multiple and diverse sets of requirements. These requirements evolved over many years; however, the requirements had not been managed nor communicated comprehensively or effectively. A series of programmatic findings over several years of external audits was evidence of this downfall. Today, these same requirements flow down through a new TA-V management system that produces consistently applied and reproducible approaches to work practices. In 2008, the TA-V department managers assessed the state of TA-V services and work activities to understand how to improve customer interfaces, stakeholders perceptions, and workforce efficiencies. The TA-V management team initiated the TA-V Transformation Project after they deemed the pre-June 2008 operational model to be ineffective in managing work and in providing integrated, continuous improvement to TA-V processes. This report summarizes the TA-V Transformation Project goals, activities, and accomplishments.

  11. Virtual Campus Hub technical evaluation report

    DEFF Research Database (Denmark)

    Vercoulen, Frank; Badger, Merete; Monaco, Lucio

    This report describes and discusses the technical achievements of the Virtual Campus Hub project and formulates a brief agenda for the future.......This report describes and discusses the technical achievements of the Virtual Campus Hub project and formulates a brief agenda for the future....

  12. Columbia River Channel Improvement Project Rock Removal Blasting: Monitoring Plan

    Energy Technology Data Exchange (ETDEWEB)

    Carlson, Thomas J.; Johnson, Gary E.

    2010-01-29

    This document provides a monitoring plan to evaluate take as outlined in the National Marine Fisheries Service 2002 Biological Opinion for underwater blasting to remove rock from the navigation channel for the Columbia River Channel Improvement Project. The plan was prepared by the Pacific Northwest National Laboratory (PNNL) for the U.S. Army Corps of Engineers (USACE), Portland District.

  13. Project TN-030: hydrogeology - ORNL radioactive waste burial grounds

    International Nuclear Information System (INIS)

    1981-01-01

    Continuation of an effort started in 1980, the water-level and precipitation data collected during the early years of the project were compiled into a series of five basic data reports. Technical advice on the design of piezometers in Burial Ground 5 was provided, and their construction has been monitored. Field work has continued, principally in Burial Grounds 5 and 6

  14. Laboratory and project based learning in the compulsory course Biological Chemistry enhancing collaboration and technical communication between groups

    DEFF Research Database (Denmark)

    Agersø, Yvonne; Bysted, Anette; Jensen, Lars Bogø

    2011-01-01

    The aim of this paper was to describe how changes of laboratory training and project based learning were implemented in order to train the students in making a study design, basic laboratory skills, handling of data, technical communication, collaboration and presentation....

  15. Integrated monitoring and surveillance system demonstration project: Phase I accomplishments

    International Nuclear Information System (INIS)

    Aumeier, S.E.; Walters, B.G.; Crawford, D.C.

    1997-01-01

    The authors present the results of the Integrated Monitoring and Surveillance System (IMSS) demonstration project Phase I efforts. The rationale behind IMSS development is reviewed and progress in each of the 5 basic tasks is detailed. Significant results include decisions to use Echelon LonWorks networking protocol and Microsoft Access for the data system needs, a preliminary design for the plutonium canning system glovebox, identification of facilities and materials available for the demonstration, determination of possibly affected facility documentation, and a preliminary list of available sensor technologies. Recently imposed changes in the overall project schedule and scope are also discussed and budgetary requirements for competition of Phase II presented. The results show that the IMSS demonstration project team has met and in many cases exceeded the commitments made for Phase I deliverables

  16. Technical Assistance Contractor management plan. Revision 1

    International Nuclear Information System (INIS)

    1995-08-01

    The Technical Assistance Contractor (TAC) for the Uranium Mill Tailings Remedial Action (UMTRA) Project comprises Jacobs Engineering Group Inc. (JEG) as the prime contractor and three teaming partner subcontractors: Roy F. Weston, Inc. (RFW), AGRA Earth and Environmental, Inc. (AGRA), and Geraghty and Miller, Inc. (G and M). The TAC contract's scope is to provide technical, analytical, environmental, engineering, design, inspection, and management support services to the US Department of Energy (DOE) for both Surface and Ground Water Projects. The TAC team supports the DOE in completing surface remedial action and initiating ground water remediation work for start-up, characterization, compliance planning, design, construction oversight, and remedial operations. The TAC provides the DOE UMTRA Project Team with a dedicated management, scientific, and technical resource base in Albuquerque, New Mexico, which is supplemented by corporate resources. A carefully developed and maintained staff of technical experts is available to assess, analyze, develop, and execute cost-effective solutions to the demanding technical and institutional problems presented by the UMTRA Project

  17. Task 1. Monitoring real time materials degradation. NRC extended In-situ and real-time Monitoring

    Energy Technology Data Exchange (ETDEWEB)

    Bakhtiari, Sasan [Argonne National Lab. (ANL), Argonne, IL (United States)

    2012-03-01

    The overall objective of this project was to perform a scoping study to identify, in concert with the nuclear industry, those sensors and techniques that have the most promising commercial viability and fill a critical inspection or monitoring need. Candidates to be considered include sensors to monitor real-time material degradation, characterize residual stress, monitor and inspect component fabrication, assess radionuclide and associated chemical species concentrations in ground water and soil, characterize fuel properties, and monitor severe accident conditions. Under Task 1—Monitoring Real-Time Materials Degradation—scoping studies were conducted to assess the feasibility of potential inspection and monitoring technologies (i.e., a combination of sensors, advanced signal processing techniques, and data analysis methods) that could be utilized in LWR and/or advanced reactor applications for continuous monitoring of degradation in-situ. The goal was to identify those techniques that appear to be the most promising, i.e., those that are closest to being both technically and commercially viable and that the nuclear industry is most likely to pursue. Current limitations and associated issues that must be overcome before commercial application of certain techniques have also been addressed.

  18. Technology status in support of refined technical baseline for the Spent Nuclear Fuel project. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Puigh, R.J.; Toffer, H.; Heard, F.J.; Irvin, J.J.; Cooper, T.D.

    1995-10-20

    The Spent Nuclear Fuel Project (SNFP) has undertaken technology acquisition activities focused on supporting the technical basis for the removal of the N Reactor fuel from the K Basins to an interim storage facility. The purpose of these technology acquisition activities has been to identify technology issues impacting design or safety approval, to establish the strategy for obtaining the necessary information through either existing project activities, or the assignment of new work. A set of specific path options has been identified for each major action proposed for placing the N Reactor fuel into a ``stabilized`` form for interim storage as part of this refined technical basis. This report summarizes the status of technology information acquisition as it relates to key decisions impacting the selection of specific path options. The following specific categories were chosen to characterize and partition the technology information status: hydride issues and ignition, corrosion, hydrogen generation, drying and conditioning, thermal performance, criticality and materials accountability, canister/fuel particulate behavior, and MCO integrity. This report represents a preliminary assessment of the technology information supporting the SNFP. As our understanding of the N Reactor fuel performance develops the technology information supporting the SNFP will be updated and documented in later revisions to this report. Revision 1 represents the incorporation of peer review comments into the original document. The substantive evolution in our understanding of the technical status for the SNFP (except section 3) since July 1995 have not been incorporated into this revision.

  19. Technology status in support of refined technical baseline for the Spent Nuclear Fuel project. Revision 1

    International Nuclear Information System (INIS)

    Puigh, R.J.; Toffer, H.; Heard, F.J.; Irvin, J.J.; Cooper, T.D.

    1995-01-01

    The Spent Nuclear Fuel Project (SNFP) has undertaken technology acquisition activities focused on supporting the technical basis for the removal of the N Reactor fuel from the K Basins to an interim storage facility. The purpose of these technology acquisition activities has been to identify technology issues impacting design or safety approval, to establish the strategy for obtaining the necessary information through either existing project activities, or the assignment of new work. A set of specific path options has been identified for each major action proposed for placing the N Reactor fuel into a ''stabilized'' form for interim storage as part of this refined technical basis. This report summarizes the status of technology information acquisition as it relates to key decisions impacting the selection of specific path options. The following specific categories were chosen to characterize and partition the technology information status: hydride issues and ignition, corrosion, hydrogen generation, drying and conditioning, thermal performance, criticality and materials accountability, canister/fuel particulate behavior, and MCO integrity. This report represents a preliminary assessment of the technology information supporting the SNFP. As our understanding of the N Reactor fuel performance develops the technology information supporting the SNFP will be updated and documented in later revisions to this report. Revision 1 represents the incorporation of peer review comments into the original document. The substantive evolution in our understanding of the technical status for the SNFP (except section 3) since July 1995 have not been incorporated into this revision

  20. Technical Monitoring System for a New Part of Gdańsk Deepwater Container Terminal

    Directory of Open Access Journals (Sweden)

    Miśkiewicz Mikołaj

    2017-04-01

    Full Text Available Development strategy for the port of Gdańsk assumes that , up to 2027, it will become the main transport centre in the Baltic Sea region. To this end , for many years work has been carried out to facilitate access to the port both by sea and land. One of the elements of extension of the port is the building of another terminal of Deepwater Container Terminal, Gdańsk. In this task, geotechnical operations aimed at appropriate preparation of subgrade for storage of containers and operation of cranes, have been especially important. Effectiveness of the assumed design solution of land-side girder for gantry crane has been verified by means of a technical monitoring system. This paper presents main elements of design the land-side girder of a new quay of the container terminal in Gdańsk, together with its computational analysis, as well as the results collected during a few months of observation, which have revealed real work of monitored elements.

  1. UMTRA project water sampling and analysis plan, Tuba City, Arizona

    International Nuclear Information System (INIS)

    1996-02-01

    Planned, routine ground water sampling activities at the U.S. Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project site in Tuba City, Arizona, are described in the following sections of this water sampling and analysis plan (WSAP). This plan identifies and justifies the sampling locations, analytical parameters, detection limits, and sampling frequency for the stations routinely monitored at the site. The ground water data are used for site characterization and risk assessment. The regulatory basis for routine ground water monitoring at UMTRA Project sites is derived from the U.S. Environmental Protection Agency (EPA) regulations in 40 CFR Part 192 (1994) and the final EPA standards of 1995 (60 FR 2854). Sampling procedures are guided by the UMTRA Project standard operating procedures (SOP) (JEG, n.d.), and the most effective technical approach for the site

  2. DECOVALEX II PROJECT Technical Report - Task 2C

    International Nuclear Information System (INIS)

    Jing, L.; Stephansson, O.; Chijimatzu, M.; Tsang, C.F.

    1999-05-01

    The DECOVALEX II project is an international co-operative research project supported by a number of national radioactive waste management organizations of different countries. The project studied four tasks: Task 1: numerical simulation of the RCF3 pump test at Sellafield, UK; Task 2: numerical simulation of the in situ T-H-M experiment at Kamaishi Mine, Japan; Task 3: monitoring of current development in rock fracture research; and Task 4: report on treatment of T-H-M processes in Performance Assessment works for nuclear waste repositories. The project started in 1995 and is scheduled to be finalised in March, 1999. This report concerns the Task 2 of the DECOVALEX H project. Task 2 of the DECOVALEX II project is the numerical modelling of the in-situ T-H-M experiment of a fractured rock - buffer - heater system at Kamaishi Mine, Japan. The experiment was carried out inside a test pit drilled in the floor of a 5 x 7 m alcove excavated near an existing drift at the 550 m level. The test pit has a circular cross section of diameter 1.7 m and a depth of 5 m, filled with bentonite which contains an electric heater. Four research teams studied Task 2 with different computational models. The task is divided into three sub-tasks: Task 2A, Task 2B and Task 2C. Task 2A was defined as a blind prediction to the coupled hydro-mechanical behaviour of the fractured rocks due to the excavation of the test pit. The calibration of the numerical models against measured results of pore pressures, flow rates and rock deformation before filling up of the test pit formed Task 2B. These two sub-tasks were performed to establish well calibrated fields of hydraulic conductivity and mechanical deformability of the fractured rocks at the test site. They were necessary for further simulations on interactions between the rock and buffer materials during heating experiments, as required for Task 2C, with a higher level of confidence on rock mass models. Presented in this report is the

  3. DECOVALEX II PROJECT Technical Report - Task 2C

    Energy Technology Data Exchange (ETDEWEB)

    Jing, L.; Stephansson, O. [Royal Inst. of Tech., Stockholm (Sweden). Dept. of Civil and Environmental Engineering; Boergesson, L. [Clay Technology AB, IDEON Research Center, Lund (Sweden); Chijimatzu, M. [Japan Nuclear Cycle Development Inst., Ibaraki (Japan). Waste Management and Fuel Cycle Research Center; Kautsky, F. [Swedish Nuclear Power Inspectorate (SKI), Stockholm (Sweden); Tsang, C.F. [Lawrence Berkeley National Laboratory, Berkeley, CA (United States). Earth Science Div.

    1999-05-01

    The DECOVALEX II project is an international co-operative research project supported by a number of national radioactive waste management organizations of different countries. The project studied four tasks: Task 1: numerical simulation of the RCF3 pump test at Sellafield, UK; Task 2: numerical simulation of the in situ T-H-M experiment at Kamaishi Mine, Japan; Task 3: monitoring of current development in rock fracture research; and Task 4: report on treatment ofT-H-M processes in Performance Assessment works for nuclear waste repositories. The project started in 1995 and is scheduled to be finalised in March, 1999. This report concerns the Task 2 of the DECOVALEX H project. Task 2 of the DECOVALEX II project is the numerical modelling of the in-situ T-H-M experiment of a fractured rock - buffer - heater system at Kamaishi Mine, Japan. The experiment was carried out inside a test pit drilled in the floor of a 5 x 7 m alcove excavated near an existing drift at the 550 m level. The test pit has a circular cross section of diameter 1.7 m and a depth of 5 m, filled with bentonite which contains an electric heater. Four research teams studied Task 2 with different computational models. The task is divided into three sub-tasks: Task 2A, Task 2B and Task 2C. Task 2A was defined as a blind prediction to the coupled hydro-mechanical behaviour of the fractured rocks due to the excavation of the test pit. The calibration of the numerical models against measured results of pore pressures, flow rates and rock deformation before filling up of the test pit formed Task 2B. These two sub-tasks were performed to establish well calibrated fields of hydraulic conductivity and mechanical deformability of the fractured rocks at the test site. They were necessary for further simulations on interactions between the rock and buffer materials during heating experiments, as required for Task 2C, with a higher level of confidence on rock mass models. Presented in this report is the definition

  4. Results of the MITRA project: Monitoring and intervention for the transportation of dangerous goods

    International Nuclear Information System (INIS)

    Planas, E.; Pastor, E.; Presutto, F.; Tixier, J.

    2008-01-01

    The objective of the MITRA (monitoring and intervention for the transportation of dangerous goods) project was to prototype a new operational system for monitoring the transportation of dangerous goods in Europe based on regional responsibilities. This concept, based on systems used in air traffic control, aims to provide civil security centres with real-time knowledge of the position and contents of dangerous vehicles circulating in their area of responsibility, and, in the event of a dangerous situation, to issue warnings, alerts and crisis management information, thereby allowing intervention teams to react immediately with maximum safety. The project was funded by the European Commission under the 6th Framework Programme (STREP - specific targeted research project - under the Information Society Technologies priority). It started on 1 September 2004 and ended on 31 October 2006. This paper presents the results of this project and the conclusions derived from the field tests carried out in Germany and in the French/Spanish border region in order to test the proposed operational system

  5. Competency model for the project managers of technical projects

    Science.gov (United States)

    Duncan, William R.

    1992-05-01

    Traditional job description techniques were developed to support compensation decisions for hourly wage earners in a manufacturing environment. Their resultant focus on activities performed on the job works well in this environment where the ability to perform the activity adequately is objectively verifiable by testing and observation. Although many organizations have adapted these techniques for salaried employees and service environments, the focus on activities performed has never been satisfactory. For example, stating that a project manager `prepares regular project status reports' tells us little about what to look for in a potential project manager or how to determine if a practicing project manager is ready for additional responsibilities. The concept of a `competency model' has been developed within the last decade to address this shortcoming. Competency models focus on what skills are needed to perform the tasks defined by the job description. For example, a project manager must be able to communicate well both orally and in writing in order to `prepare regular project status reports.'

  6. Intraoperative monitoring of lower cranial nerves in skull base surgery: technical report and review of 123 monitored cases.

    Science.gov (United States)

    Topsakal, Cahide; Al-Mefty, Ossama; Bulsara, Ketan R; Williford, Veronica S

    2008-01-01

    The fundamental goal of skull base surgery is tumor removal with preservation of neurological function. Injury to the lower cranial nerves (LCN; CN 9-12) profoundly affects a patient's quality of life. Although intraoperative cranial nerve monitoring (IOM) is widely practiced for other cranial nerves, literature addressing the LCN is scant. We examined the utility of IOM of the LCN in a large patient series. One hundred twelve patients underwent 123 skull base operations with IOM between January 1994 to December 1999. The vagus nerve (n=37), spinal accessory nerve (n=118), and the hypoglossal nerve (n=83) were monitored intraoperatively. Electromyography (EMG) and compound muscle action potentials (CMAP) were recorded from the relevant muscles after electrical stimulation. This data was evaluated retrospectively. Patients who underwent IOM tended to have larger tumors with more intricate involvement of the lower cranial nerves. Worsening of preoperative lower cranial nerve function was seen in the monitored and unmonitored groups. With the use of IOM in the high risk group, LCN injury was reduced to a rate equivalent to that of the lower risk group (p>0.05). The immediate feedback obtained with IOM may prevent injury to the LCN due to surgical manipulation. It can also help identify the course of a nerve in patients with severely distorted anatomy. These factors may facilitate gross total tumor resection with cranial nerve preservation. The incidence of high false positive and negative CMAP and the variability in CMAP amplitude and threshold can vary depending on individual and technical factors.

  7. The decommissioning of WWER type nuclear power plants. Final report on an IAEA regional technical co-operation project

    International Nuclear Information System (INIS)

    2000-01-01

    Numerous WWER-440 nuclear power plants are in operation in central and eastern Europe and a small number have already been shut down. In addition to reactors already shut down, many other reactors will reach the end of their design lifetime in a few years and become candidates for decommissioning. It is unfortunate that little consideration was devoted to decommissioning of WWER-440 reactors at the plant design and construction stage, and little emphasis was placed on planning for decommissioning. It is within this context that the IAEA launched a regional technical co-operation project in 1994 with the aim of providing guidance on planning and management of decommissioning for WWERs. The project, which had a duration of four years (1995-1998), included the organization of workshops and scientific visits to countries having WWERs and other countries where active decommissioning projects were under way. Eventually, participants suggested the consolidation of expert guidance and collective opinions into a TECDOC, which was drafted by both designated participants from project recipient countries and invited experts. The TECDOC has the aim of serving as a stimulus for all concerned parties in central and eastern European countries to initiate concrete decommissioning planning, including assessment of existing and required resources for the eventual implementation of decommissioning plans. In addition, the regional technical co-operation project has managed to bring together in this TECDOC a number of good practices that could be useful in WWER-440 decommissioning

  8. Condition monitoring using empirical models: technical review and prospects for nuclear applications

    International Nuclear Information System (INIS)

    Heo, Gyun Young

    2008-01-01

    The purpose of this paper is to extensively review the Condition Monitoring (CM) techniques using empirical models in an effort to reduce or eliminate unexpected downtimes in general industry, and to illustrate the feasibility of applying them to the nuclear industry. CM provides on-time warnings of system states to enable the optimal scheduling of maintenance and, ultimately, plant uptime is maximized. Currently, most maintenance processes tend to be either reactive, or part of scheduled, or preventive maintenance. Such maintenance is being increasingly reported as a poor practice for two reasons: first, the component does not necessarily require maintenance, thus the maintenance cost is wasted, and secondly, failure catalysts are introduced into properly working components, which is worse. This paper first summarizes the technical aspects of CM including state estimation and state monitoring. The mathematical background of CM is mature enough even for commercial use in the nuclear industry. Considering the current computational capabilities of CM, its application is not limited by technical difficulties, but by a lack of desire on the part of industry to implement it. For practical applications in the nuclear industry, it may be more important to clarify and quantify the negative impact of unexpected outcomes or failures in CM than it is to investigate its advantages. In other words, while issues regarding accuracy have been targeted to date, the concerns regarding robustness should now be concentrated on. Standardizing the anticipated failures and the possibly harsh operating conditions, and then evaluating the impact of the proposed CM under those conditions may be necessary. In order to make the CM techniques practical for the nuclear industry in the future, it is recommended that a prototype CM system be applied to a secondary system in which most of the components are non-safety grade. Recently, many activities to enhance the safety and efficiency of the

  9. Research and Practice of Uav Remote Sensing in the Monitoring and Management of Construction Projects in Riparian Areas

    Science.gov (United States)

    Yu, J.; Gan, Z.; Zhong, L.; Deng, L.

    2018-04-01

    The objective of this paper is to investigate the use of UAV remote sensing in the monitoring and management of construction projects in riparian areas through the case study of embankment construction projects' monitoring in the Three Gorges Reservoir area. A three-step approach is proposed to address the problem: data acquisition with UAV, data processing, and monitoring information extraction. The results of the case study demonstrate that UAV remote sensing is capable of providing fast and accurate measurements and calculations for the needs of monitoring of riparian constructions.

  10. Improving artificial breeding of cattle and buffalo in Asia. Guidelines and recommendations. A manual prepared under the framework of an IAEA Technical Cooperation Regional RCA Project on 'Improving Animal Productivity and Reproductive Efficiency', with technical support of the Joint FAO/IAEA Division of Nuclear Techniques in Food and Agriculture

    International Nuclear Information System (INIS)

    2005-11-01

    The International Atomic Energy Agency (IAEA) and the Regional Cooperative Agreement for Asia and the Pacific Region (RCA), with technical support of the Joint FAO/IAEA Programme of Nuclear Techniques in Food and Agriculture, implemented a Technical Cooperation (TC) project entitled Improving Animal Productivity and Reproductive Efficiency. The dual objectives of this project are (a) strengthening and extending the field applications of Urea Molasses Multinutrient Blocks (UMMB) and other feed supplementation strategies, and (b) monitoring and improving the reproductive management and fertility of smallholder dairy cattle subjected to Artificial Insemination (AI). The radioimmunoassay (RIA) for measurement of progesterone in milk and use of the computer database AIDA (Artificial Insemination Database Application) play important roles in the success of the latter objective. The first meeting to plan project activities was held in January 1999 in Yangon, Myanmar and the second meeting to review progress and develop further work plans was held in February 2000 in Kuala Lumpur, Malaysia. The latter meeting concluded that the procedures currently used by different Asian countries for evaluation of breeding bulls should be standardized and unified protocols developed for ensuring quality control of semen during processing, storage and field use. It was recommended that this should be accomplished through a regional workshop of national consultants. A workshop of national consultants from 10 RCA Member States was therefore held in April 2002 in Faisalabad, Pakistan, to consider and discuss the following aspects and arrive at a consensus on the best procedures and practices to be adopted to suit conditions and needs in developing countries of Asia: - Selection, management and health control of AI bulls; - Semen technologies from collection through processing to storage; - Delivery and follow-up of field AI services to farmers The IAEA has also supported a similar project in

  11. International linear collider. A technical progress report

    Energy Technology Data Exchange (ETDEWEB)

    Arnold, Ned [Argonne National Laboratory, IL (United States); Aderhold, Sebastian [DESY, Hamburg (Germany); Adolphsen, Chris [Stanford Linear Accelerator Center, Menlo Park, CA (United States); and others

    2012-07-01

    The International Linear Collider: A Technical Progress Report marks the halfway point towards the Global Design Effort fulfilling its mandate to follow up the ILC Reference Design Report with a more optimised Technical Design Report (TDR) by the end of 2012. The TDR will be based on much of the work reported here and will contain all the elements needed to propose the ILC to collaborating governments, including a technical design and implementation plan that are realistic and have been better optimised for performance, cost and risk. We are on track to develop detailed plans for the ILC, such that once results from the Large Hadron Collider (LHC) at CERN establish the main science goals and parameters of the next machine, we will be in good position to make a strong proposal for this new major global project in particle physics. The two overriding issues for the ILC R and D programme are to demonstrate that the technical requirements for the accelerator are achievable with practical technologies, and that the ambitious physics goals can be addressed by realistic ILC detectors. This GDE interim report documents the impressive progress on the accelerator technologies that can make the ILC a reality. It highlights results of the technological demonstrations that are giving the community increased confidence that we will be ready to proceed with an ILC project following the TDR. The companion detector and physics report document likewise demonstrates how detector designs can meet the ambitious and detailed physics goals set out by the ILC Steering Committee. LHC results will likely affect the requirements for the machine design and the detectors, and we are monitoring that very closely, intending to adapt our design as those results become available.

  12. International Linear Collider-A Technical Progress Report

    Energy Technology Data Exchange (ETDEWEB)

    Elsen, Eckhard; /DESY; Harrison, Mike; /Brookhaven; Hesla, Leah; /Fermilab; Ross, Marc; /Fermilab; Royole-Degieux, Perrine; /Paris, IN2P3; Takahashi, Rika; /KEK, Tsukuba; Walker, Nicholas; /DESY; Warmbein, Barbara; /DESY; Yamamoto, Akira; /KEK, Tsukuba; Yokoya, Kaoru; /KEK, Tsukuba; Zhang, Min; /Beijing, Inst. High Energy Phys.

    2011-11-04

    The International Linear Collider: A Technical Progress Report marks the halfway point towards the Global Design Effort fulfilling its mandate to follow up the ILC Reference Design Report with a more optimised Technical Design Report (TDR) by the end of 2012. The TDR will be based on much of the work reported here and will contain all the elements needed to propose the ILC to collaborating governments, including a technical design and implementation plan that are realistic and have been better optimised for performance, cost and risk. We are on track to develop detailed plans for the ILC, such that once results from the Large Hadron Collider (LHC) at CERN establish the main science goals and parameters of the next machine, we will be in good position to make a strong proposal for this new major global project in particle physics. The two overriding issues for the ILC R&D programme are to demonstrate that the technical requirements for the accelerator are achievable with practical technologies, and that the ambitious physics goals can be addressed by realistic ILC detectors. This GDE interim report documents the impressive progress on the accelerator technologies that can make the ILC a reality. It highlights results of the technological demonstrations that are giving the community increased confidence that we will be ready to proceed with an ILC project following the TDR. The companion detector and physics report document likewise demonstrates how detector designs can meet the ambitious and detailed physics goals set out by the ILC Steering Committee. LHC results will likely affect the requirements for the machine design and the detectors, and we are monitoring that very closely, intending to adapt our design as those results become available.

  13. Environmental monitoring for the hot dry rock geothermal energy development project. Annual report, July 1975--June 1976

    Energy Technology Data Exchange (ETDEWEB)

    Pettitt, R.A. (comp.)

    1976-09-01

    The objectives of this environmental monitoring report are to provide a brief conceptual and historical summary of the Hot Dry Rock Geothermal Project, a brief overview of the environmental monitoring responsibilities and activities of the Los Alamos Scientific Laboratory, and descriptions of the studies, problems, and results obtained from the various monitoring programs. Included are descriptions of the work that has been done in three major monitoring areas: (1) water quality, both surface and subsurface; (2) seismicity, with a discussion of the monitoring strategy of regional, local, and close-in detection networks; and (3) climatology. The purpose of these programs is to record baseline data, define potential effects from the project activities, and determine and record any impacts that may occur.

  14. Technical assistance contractor Management Plan. Final [report

    Energy Technology Data Exchange (ETDEWEB)

    1993-09-01

    The Technical Assistance Contractor (TAC) for the Uranium Mill Tailings Remedial Action (UMTRA) Project comprises Jacobs Engineering Group Inc. (JEG) and its major teaming partners [Roy F. Weston, Inc. (RFW), Sergent, Hauskins & Beckwith Agra, Inc. (SHB Agra), and Geraghty & Miller, Inc. (G&M)]. The first three companies have worked together effectively on the UMTRA Project for more than 10 years. With the initiation of the UMTRA Groundwater Project in April 1991, a need arose to increase the TAC`s groundwater technical breadth and depth, so G&M was brought in to augment the team`s capabilities. The TAC contract`s scope is to provide technical, analytical, environmental, engineering, design, inspection, and management support services to the US Department of Energy (DOE) for both surface and groundwater projects. The TAC team continues to support the DOE in completing surface remedial actions and initiating groundwater remediation work for start-up, characterization, design, construction oversight, and remedial operations. A key feature of the TAC`s management approach is the extensive set of communication systems implemented for the UMTRA Project. These systems assist all functional disciplines in performing UMTRA Project tasks associated with management, technical support, administrative support, and financial/project controls.

  15. Wyoming coal-conversion project. Final technical report, November 1980-February 1982. [Proposed WyCoalGas project, Converse County, Wyoming; contains list of appendices with title and identification

    Energy Technology Data Exchange (ETDEWEB)

    None

    1982-01-01

    This final technical report describes what WyCoalGas, Inc. and its subcontractors accomplished in resolving issues related to the resource, technology, economic, environmental, socioeconomic, and governmental requirements affecting a project located near Douglas, Wyoming for producing 150 Billion Btu per day by gasifying sub-bituminous coal. The report summarizes the results of the work on each task and includes the deliverables that WyCoalGas, Inc. and the subcontractors prepared. The co-venturers withdrew from the project for two reasons: federal financial assistance to the project was seen to be highly uncertain; and funds were being expended at an unacceptably high rate.

  16. The Development of K-8 Progress Monitoring Measures in Mathematics for Use with the 2% and General Education Populations: Grade 1. Technical Report # 0919

    Science.gov (United States)

    Alonzo, Julie; Tindal, Gerald

    2009-01-01

    In this technical report, we describe the development and piloting of a series of mathematics progress monitoring measures intended for use with students in grade 1. These measures, available as part of easyCBM [TM], an online progress monitoring assessment system, were developed in 2008 and administered to approximately 2800 students from schools…

  17. The Development of K-8 Progress Monitoring Measures in Mathematics for Use with the 2% and General Education Populations: Grade 2. Technical Report # 0920

    Science.gov (United States)

    Alonzo, Julie; Lai, Cheng Fei; Tindal, Gerald

    2009-01-01

    In this technical report, we describe the development and piloting of a series of mathematics progress monitoring measures intended for use with students in grades kindergarten through eighth grade. These measures, available as part of easyCBM[TM], an online progress monitoring assessment system, were developed in 2007 and 2008 and administered to…

  18. The Development of K-8 Progress Monitoring Measures in Mathematics for Use with the 2% and General Education Populations: Grade 7. Technical Report 0908

    Science.gov (United States)

    Lai, Cheng Fei; Alonzo, Julie; Tindal, Gerald

    2009-01-01

    In this technical report, we describe the development and piloting of a series of mathematics progress monitoring measures intended for use with students in grades kindergarten through eighth grade. These measures, available as part of easyCBM[TM], an online progress monitoring assessment system, were developed in 2007 and 2008 and administered to…

  19. Independent technical review, handbook

    International Nuclear Information System (INIS)

    1994-02-01

    Purpose Provide an independent engineering review of the major projects being funded by the Department of Energy, Office of Environmental Restoration and Waste Management. The independent engineering review will address questions of whether the engineering practice is sufficiently developed to a point where a major project can be executed without significant technical problems. The independent review will focus on questions related to: (1) Adequacy of development of the technical base of understanding; (2) Status of development and availability of technology among the various alternatives; (3) Status and availability of the industrial infrastructure to support project design, equipment fabrication, facility construction, and process and program/project operation; (4) Adequacy of the design effort to provide a sound foundation to support execution of project; (5) Ability of the organization to fully integrate the system, and direct, manage, and control the execution of a complex major project

  20. Independent technical review, handbook

    Energy Technology Data Exchange (ETDEWEB)

    1994-02-01

    Purpose Provide an independent engineering review of the major projects being funded by the Department of Energy, Office of Environmental Restoration and Waste Management. The independent engineering review will address questions of whether the engineering practice is sufficiently developed to a point where a major project can be executed without significant technical problems. The independent review will focus on questions related to: (1) Adequacy of development of the technical base of understanding; (2) Status of development and availability of technology among the various alternatives; (3) Status and availability of the industrial infrastructure to support project design, equipment fabrication, facility construction, and process and program/project operation; (4) Adequacy of the design effort to provide a sound foundation to support execution of project; (5) Ability of the organization to fully integrate the system, and direct, manage, and control the execution of a complex major project.

  1. Final Technical Report on STTR Project DE-FG02-06ER86282 Development and Demonstration of 6-Dimensional Muon Beam Cooling

    Energy Technology Data Exchange (ETDEWEB)

    Muons, Inc.

    2011-05-24

    The overarching purpose of this project was to prepare a proposal for an experiment to demonstrate 6-dimensional muon beam cooling. The technical objectives were all steps in preparing the proposal, which was successfully presented to the Fermilab Accelerator Advisory Committee in February 2009. All primary goals of this project have been met.

  2. Problems of technical cooperation

    International Nuclear Information System (INIS)

    Noramli, M.

    1987-01-01

    The main principles of the IAEA technical co-operation program, which intends to answer the requirements of the member states as regards technical assistance, are presented. IAEA offers its assistance in the supervision and financial support of the projects, which promise direct and quick profit to the member states. Projects related to the satisfaction of the main demands of humanity, industrial use, energy generation, radiation protection and other fields, which can promote the contribution of nuclear power generation to the course of peace, protection of health and thriving of states, are among them. 35 million dollars (USA) was allocated for the IAEA technical assistance and realization of the co-operation program in 1987

  3. Innovative methods of popularizing technical education

    Science.gov (United States)

    Shkitsa, L. Y.; Panchuk, V. G.; Kornuta, V. A.

    2017-05-01

    There have been analyzed reasons of the loss of technical education’s popularity. Also, the analysis of known educational and production methods, oriented at the innovative model of development of society, was performed. It is stated that the acquisition of 21st century’s skills as a result of competition of technical education are natural for the DIY ideology, which was realized in the institutions like Fab Lab. The new educational strategy, based on project-based learning, is proposed to be implemented as a special laboratory with equipment, which would be a center of innovative development for students at the Technical University. Moreover, the list of projects planned for implementation, that includes not only projects, specific to a particular university, but also projects, demanded by society as a whole, is specified. It is worth to implement trendy projects in the laboratory, such as toy-like, ecological projects; projects of the energy dependence decrease or the energy efficiency increase, modern digital or innovative projects etc. The student should gain knowledge, skills and, possibly, equipment that are available for immediate usage on the labor market or for the realization of his own projects or the community’s projects in everyday life after the realization of the particular project at the laboratory

  4. Technical Assistance Contractor management plan. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-08-01

    The Technical Assistance Contractor (TAC) for the Uranium Mill Tailings Remedial Action (UMTRA) Project comprises Jacobs Engineering Group Inc. (JEG) as the prime contractor and three teaming partner subcontractors: Roy F. Weston, Inc. (RFW), AGRA Earth and Environmental, Inc. (AGRA), and Geraghty and Miller, Inc. (G and M). The TAC contract`s scope is to provide technical, analytical, environmental, engineering, design, inspection, and management support services to the US Department of Energy (DOE) for both Surface and Ground Water Projects. The TAC team supports the DOE in completing surface remedial action and initiating ground water remediation work for start-up, characterization, compliance planning, design, construction oversight, and remedial operations. The TAC provides the DOE UMTRA Project Team with a dedicated management, scientific, and technical resource base in Albuquerque, New Mexico, which is supplemented by corporate resources. A carefully developed and maintained staff of technical experts is available to assess, analyze, develop, and execute cost-effective solutions to the demanding technical and institutional problems presented by the UMTRA Project.

  5. Hybrid causal methodology and software platform for probabilistic risk assessment and safety monitoring of socio-technical systems

    Energy Technology Data Exchange (ETDEWEB)

    Groth, Katrina, E-mail: kgroth@umd.ed [Center for Risk and Reliability, 0151 Glenn L. Martin Hall, University of Maryland, College Park, MD 20742 (United States); Wang Chengdong; Mosleh, Ali [Center for Risk and Reliability, 0151 Glenn L. Martin Hall, University of Maryland, College Park, MD 20742 (United States)

    2010-12-15

    This paper introduces an integrated framework and software platform for probabilistic risk assessment (PRA) and safety monitoring of complex socio-technical systems. An overview of the three-layer hybrid causal logic (HCL) modeling approach and corresponding algorithms, implemented in the Trilith software platform, are provided. The HCL approach enhances typical PRA methods by quantitatively including the influence of soft causal factors introduced by human and organizational aspects of a system. The framework allows different modeling techniques to be used for different aspects of the socio-technical system. The HCL approach combines the power of traditional event sequence diagram (ESD)event tree (ET) and fault tree (FT) techniques for modeling deterministic causal paths, with the flexibility of Bayesian belief networks for modeling non-deterministic cause-effect relationships among system elements (suitable for modeling human and organizational influences). Trilith enables analysts to construct HCL models and perform quantitative risk assessment and management of complex systems. The risk management capabilities included are HCL-based risk importance measures, hazard identification and ranking, precursor analysis, safety indicator monitoring, and root cause analysis. This paper describes the capabilities of the Trilith platform and power of the HCL algorithm by use of example risk models for a type of aviation accident (aircraft taking off from the wrong runway).

  6. Hybrid causal methodology and software platform for probabilistic risk assessment and safety monitoring of socio-technical systems

    International Nuclear Information System (INIS)

    Groth, Katrina; Wang Chengdong; Mosleh, Ali

    2010-01-01

    This paper introduces an integrated framework and software platform for probabilistic risk assessment (PRA) and safety monitoring of complex socio-technical systems. An overview of the three-layer hybrid causal logic (HCL) modeling approach and corresponding algorithms, implemented in the Trilith software platform, are provided. The HCL approach enhances typical PRA methods by quantitatively including the influence of soft causal factors introduced by human and organizational aspects of a system. The framework allows different modeling techniques to be used for different aspects of the socio-technical system. The HCL approach combines the power of traditional event sequence diagram (ESD)event tree (ET) and fault tree (FT) techniques for modeling deterministic causal paths, with the flexibility of Bayesian belief networks for modeling non-deterministic cause-effect relationships among system elements (suitable for modeling human and organizational influences). Trilith enables analysts to construct HCL models and perform quantitative risk assessment and management of complex systems. The risk management capabilities included are HCL-based risk importance measures, hazard identification and ranking, precursor analysis, safety indicator monitoring, and root cause analysis. This paper describes the capabilities of the Trilith platform and power of the HCL algorithm by use of example risk models for a type of aviation accident (aircraft taking off from the wrong runway).

  7. Monitoring and Evaluation Plan for the Nez Perce Tribal Hatchery, 1996 Technical Report.

    Energy Technology Data Exchange (ETDEWEB)

    Steward, Cleveland R.

    1996-08-01

    The Nez Perce Tribe has proposed to build and operate the Nez Perce Tribal Hatchery (NPTH) in the Clearwater River subbasin of Idaho for the purpose of restoring self-sustaining populations of spring, summer, and fall chinook salmon to their native habitats. The project comprises a combination of incubation and rearing facilities, satellite rearing facilities, juvenile and adult collection sites, and associated production and harvest management activities. As currently conceived, the NPTH program will produce approximately 768,000 spring chinook parr, 800,000 summer chinook fry, and 2,000,000 fall chinook fry on an annual basis. Hatchery fish would be spawned, reared, and released under conditions that promote wild-type characteristics, minimize genetic changes in both hatchery and wild chinook populations, and minimize undesirable ecological interactions. The primary objective is to enable hatchery-produced fish to return to reproduce naturally in the streams in which they are released. These and other characteristics of the project are described in further detail in the Nez Perce Tribal Hatchery Master Plan (Larson and Mobrand 1992), the 1995 Supplement to the Master Plan (Johnson et al. 1995), and the Nez Perce Tribal Hatchery Program Environmental Impact Statement (Bonneville Power Administration et al. 1996). The report in hand is referred to in project literature as the NPTH Monitoring and Evaluation (M&E) Plan. This report describes monitoring and evaluation activities that will help NPTH managers determine. whether they were successful in restoring chinook salmon populations and avoiding adverse ecological impacts. Program success will be gauged primarily by changes in the abundance and distribution of supplemented chinook populations. The evaluation of project-related impacts will focus on the biological effects of constructing and operating NPTH hatchery facilities, introducing hatchery fish into the natural environment, and removing or displacing wild

  8. Biogas Koczala. Biogas project in Koczala. Feasibility study. Technical report

    International Nuclear Information System (INIS)

    2004-08-01

    The present production of district heating in Koczala is based on coal. The district heating system is worn out technically and economically and according to the 2001 Energy Plan of Koczala the district heating plant shall be converted to a combination of a biogas fired CHP and a wood chip boiler. The overall objective of this project is to access the feasibility and viability construction an operation of a biogas plant owned by the co-operative agricultural company, Poldanor S.A. The feasibility study includes: 1) Availability of organic waste in the Koczala area, 2) Possibilities of using energy crops in the biogas plant, 3) Possibilities of receiving grants from the Polish National Fund for Environmental Protection, the new EU regional funds and through the joint implementation market (CO 2 quotas), 4) Alternative locations of the biogas plant and the CHP unit, 5) Alternative strategies for selling electricity and heat, 6) Organisational issues (ownership). This report concludes that implementing the biogas project is environmentally and financially feasible and viable. If organic waste and/or maize silage can be provided and gasified without problems, the plant can supply as well the Koczala farm as the fodder mill with steam and heat, and also supply Koczala district heating system with approx. 75% of yearly heat consumption. Furthermore, electricity is supplied to the fodder mill and the public grid. (BA)

  9. Independent technical reviews for groundwater and soil remediation projects at US Department Of Energy sites - 59188

    International Nuclear Information System (INIS)

    Kaback, Dawn S.; Chamberlain, Grover; Morse, John G.; Petersen, Scott W.

    2012-01-01

    The US Department of Energy Office of Environmental Management has supported independent technical reviews of soil and groundwater projects at multiple DOE sites over the last 10 years. These reviews have resulted in significant design improvements to remedial plans that have accelerated cleanup and site closure. Many have also resulted in improved understanding of complex subsurface conditions, promoting better approaches to design and implementation of new technologies. Independent technical reviews add value, because they provide another perspective to problem solving and act as a check for especially challenging problems. By bringing in a team of independent experts with a broad experience base, alternative solutions are recommended for consideration and evaluation. In addition, the independence of the panel is significant, because it is able to address politically sensitive issues. The expert panel members typically bring lessons learned from other sites to help solve the DOE problems. In addition, their recommendations at a particular site can often be applied at other sites, making the review even more valuable. The review process can vary, but some common lessons ensure a successful review: - Use a multi-disciplinary broadly experienced team; - Engage the panel early and throughout the project; - Involve regulators and stakeholders in the workshop, if appropriate. - Provide sufficient background information; - Close the workshop with a debriefing followed by a written report. Many groundwater remediation challenges remain at DOE sites. Independent technical reviews have and will ensure that the best capabilities and experience are applied to reduce risks and uncertainties. Even though the groundwater remediation industry has developed significantly over the last twenty years, advancements are needed to address the complexities of the subsurface at the DOE sites. These advancements have tremendous potential to save millions of dollars and to accelerate the

  10. Demonstration project in Volgograd on transfer of know-how from the district heating sector in Denmark to Russia. Final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-08-01

    A demonstration project on district heating know-how has been financed by the Danish Technical Assistance Programme administrated by the Danish Energy Agency. A demonstration project in Volgograd was approved, with a budget of only 200.000 DKK (180.000 Rbl). The administration of the project, from fact finding to the final report, has been very efficient in particular to other technical assistance programmes. Although the total budget is low only around 15% of the manpower has been used on administration. The transfer of specific technical experience can be summarized in the following: Installation of small decentralized heat exchanger units for preparation of hot water; Construction of low-cost decentralized heat exchanger installations for preparation of hot water; Installation of thermostatic valves; Installation of small substations for heating and hot water; Use of drain pumps for draining under constructions of district heating pipes to prevent outside corrosion; Design principles for construction and rehabilitation of concrete duct systems with internal and outside draining; Design principles for preinsulated pipes; Principles for monitoring the quality of supply in a local district heating network at the lowest costs by monitoring the critical differential pressure. (EG)

  11. Grande Ronde Model Watershed Program Administration and Habitat Projects, Annual Progress Report, Project Period: Program Administration: January 1, 1997 - December 31, 1997 Habitat Projects: January 1, 1997 - March 31, 1998.

    Energy Technology Data Exchange (ETDEWEB)

    Noyes, Cecilia; Kuchenbecker, Lyle; Perry, Patty

    1998-10-28

    This agreement provided funding for operation and administration of the Grande Ronde Model Watershed Program including staffing of an Executive Director, Program Planner, and clerical personnel. The contract covers maintaining program services, project planning, subwatershed plans (CRMP's), public involvement and education, interagency coordination/clearing house, monitoring, and technical support activities that have taken place in the Grande Ronde basin. Cost-share has been received from the Bureau of Reclamation and the Governor's Watershed Enhancement Board.

  12. Feasibility study and technical proposal for seismic monitoring of tunnel boring machine in Olkiluoto

    Energy Technology Data Exchange (ETDEWEB)

    Saari, J.; Lakio, A. (AF-Consult Ltd, Vantaa (Finland))

    2009-01-15

    In Olkiluoto, Posiva Oy has operated a local seismic network since February 2002. The purpose of the microearthquake measurements at Olkiluoto is to improve understanding of the structure, behaviour and long term stability of the bedrock. The studies include both tectonic and excavation-induced microearthquakes. An additional task of monitoring is related to safeguarding of the ONKALO. The possibility to excavate an illegal access to the ONKALO, have been concerned when the safeguards are discussed. Therefore all recorded explosions in the Olkiluoto area and in the ONKALO are located. If a concentration of explosions is observed, the origin of that is found out. Also a concept of hidden illegal explosions, detonated at the same time as the real excavation blasts, has been examined. According to the experience gained in Olkiluoto, it can be concluded that, as long the seismic network is in operation and the results are analysed by a skilled person, it is practically impossible to do illegal excavation by blasts. In this report a possibility of seismic monitoring of illegal excavation done by tunnel boring machine (TBM) has been investigated. Characteristics of the seismic signal generated by the raise boring machine are described. According to this study, it can be concluded that the generated seismic signal can be detected and the source of the signal can be located. However, this task calls for different kind of monitoring system than that, which is currently used for monitoring microearthquakes and explosions. The presented technical proposal for seismic monitoring of TBM in Olkiluoto is capable to detect and locate TBM coming outside the ONKALO area about two months before it would reach the ONKALO. (orig.)

  13. Feasibility study and technical proposal for seismic monitoring of tunnel boring machine in Olkiluoto

    International Nuclear Information System (INIS)

    Saari, J.; Lakio, A.

    2009-01-01

    In Olkiluoto, Posiva Oy has operated a local seismic network since February 2002. The purpose of the microearthquake measurements at Olkiluoto is to improve understanding of the structure, behaviour and long term stability of the bedrock. The studies include both tectonic and excavation-induced microearthquakes. An additional task of monitoring is related to safeguarding of the ONKALO. The possibility to excavate an illegal access to the ONKALO, have been concerned when the safeguards are discussed. Therefore all recorded explosions in the Olkiluoto area and in the ONKALO are located. If a concentration of explosions is observed, the origin of that is found out. Also a concept of hidden illegal explosions, detonated at the same time as the real excavation blasts, has been examined. According to the experience gained in Olkiluoto, it can be concluded that, as long the seismic network is in operation and the results are analysed by a skilled person, it is practically impossible to do illegal excavation by blasts. In this report a possibility of seismic monitoring of illegal excavation done by tunnel boring machine (TBM) has been investigated. Characteristics of the seismic signal generated by the raise boring machine are described. According to this study, it can be concluded that the generated seismic signal can be detected and the source of the signal can be located. However, this task calls for different kind of monitoring system than that, which is currently used for monitoring microearthquakes and explosions. The presented technical proposal for seismic monitoring of TBM in Olkiluoto is capable to detect and locate TBM coming outside the ONKALO area about two months before it would reach the ONKALO. (orig.)

  14. Technical approach for the management of UMTRA ground water investigation-derived wastes

    International Nuclear Information System (INIS)

    1994-02-01

    During characterization, remediation, or monitoring activities of the US Department of Energy's (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project, ground water samples are collected to assess the extent and amount of waterborne contamination that might have come from the mill tailings. This sampling sometimes occurs in contaminated areas where ground water quality has been degraded. Ground water sampling activities may result in field-generated wastes that must be disposed of in a manner protective of human health and the environment. During ground water sampling, appropriate measures must be taken to dispose of presampling purge water and well development water that is pumped to flush out any newly constructed wells. Additionally, pumping tests may produce thousands of gallons of potentially contaminated ground water that must be properly managed. In addition to the liquid wastes, there is the potential for bringing contaminated soils to the ground surface during the drilling and installation of water wells in areas where the subsurface soils may be contaminated. These soils must be properly managed as well. This paper addresses the general technical approach that the UMTRA Project will follow in managing field-generated wastes from well drilling, development, sampling, and testing. It will provide guidance for the preparation of Technical Assistance Contractor (TAC) Standard Operating Procedures (SOP) for the management and disposal of field-generated wastes from ground water monitoring and remediation activities

  15. Geothermal Direct Use Program Opportunity Notice Projects Lessons Learned Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Lunis, B.C.

    1986-01-01

    The use of geothermal energy for direct-use applications was aided through the development of a number of successful field experiment projects funded on a cost-shared basis by the US Department of Energy, Division of Geothermal Technology. This document provides a summary of the projects administered by the US Department of Energy's Idaho Operations Office and technically monitored through the Idaho National Engineering Laboratory (EG and G Idaho, Inc.). An overview of significant findings and conclusions is provided, as are project descriptions and activities, resource development, design, construction, and operational features. Legal and institutional considerations are also discussed.

  16. The Hanford Environmental Dose Reconstruction (HEDR) Project: Technical approach

    International Nuclear Information System (INIS)

    Napier, B.A.; Freshley, M.D.; Gilbert, R.O.; Haerer, H.A.; Morgan, L.G.; Rhoads, R.E.; Woodruff, R.K.

    1990-01-01

    Historical measurements and current assessment techniques are being combined to estimate potential radiation doses to people from radioactive releases to the air, the Columbia River, soils, and ground water at the Hanford Site since 1944. Environmental contamination from these releases has been monitored, at varying levels of detail, for 45 yr. Phase I of the Hanford Environmental Reconstruction Project will estimate the magnitude of potential doses, their areal extends, and their associated uncertainties. The Phase I study area comprises 10 counties in eastern Washington and northern Oregon, within a 100-mi radius of the site, including a stretch of the Columbia River that was most significantly affected. These counties contain a range of projected and measured contaminant levels, environmental exposure pathways, and population groups. Phase I dose estimates are being developed for the periods 1944 through 1947 for air pathways and 1964 through 1966 for river pathways. Important radionuclide/pathway combinations include fission products, such as 131 I, in milk for early atmospheric releases and activation products, such as 32 P and 65 Zn, in fish for releases to the river. Potential doses range over several orders of magnitude within the study area. We will expand the time periods and study are in three successive phases, as warranted by results of Phase I

  17. Overview of NASA's Carbon Monitoring System Flux-Pilot Project

    Science.gov (United States)

    Pawson, Steven; Gunson, Michael R.; Jucks, Kenneth

    2011-01-01

    NASA's space-based observations of physical, chemical and biological parameters in the Earth System along with state-of-the-art modeling capabilities provide unique capabilities for analyses of the carbon cycle. The Carbon Monitoring System is developing an exploratory framework for detecting carbon in the environment and its changes, with a view towards contributing to national and international monitoring activities. The Flux-Pilot Project aims to provide a unified view of land-atmosphere and ocean-atmosphere carbon exchange, using observation-constrained models. Central to the project is the application of NASA's satellite observations (especially MODIS), the ACOS retrievals of the JAXA-GOSAT observations, and the "MERRA" meteorological reanalysis produced with GEOS-S. With a primary objective of estimating uncertainty in computed fluxes, two land- and two ocean-systems are run for 2009-2010 and compared with existing flux estimates. An transport model is used to evaluate simulated CO2 concentrations with in-situ and space-based observations, in order to assess the realism of the fluxes and how uncertainties in fluxes propagate into atmospheric concentrations that can be more readily evaluated. Finally, the atmospheric partial CO2 columns observed from space are inverted to give new estimates of surface fluxes, which are evaluated using the bottom-up estimates and independent datasets. The focus of this presentation will be on the science goals and current achievements of the pilot project, with emphasis on how policy-relevant questions help focus the scientific direction. Examples include the issue of what spatio-temporal resolution of fluxes can be detected from polar-orbiting satellites and whether it is possible to use space-based observations to separate contributions to atmospheric concentrations of (say) fossil-fuel and biological activity

  18. DEVELOPMENT OF A GEOGRAPHIC VISUALIZATION AND COMMUNICATIONS SYSTEMS (GVCS) FOR MONITORING REMOTE VEHICLES

    Energy Technology Data Exchange (ETDEWEB)

    COLEMAN, P.; DUNCAN, M.; DURFEE, R.C.; GOELTZ, R; HARRISON, G.; HODGSON, M.E.; KOOK, M.; MCCLAIN, S.

    1998-03-30

    The purpose of this project is to integrate a variety of geographic information systems capabilities and telecommunication technologies for potential use in geographic network and visualization applications. The specific technical goals of the project were to design, develop, and simulate the components of an audio/visual geographic communications system to aid future real-time monitoring, mapping and managing of transport vehicles. The system components of this feasibility study are collectively referred to as a Geographic Visualization and Communications System (GVCS). State-of-the-art techniques will be used and developed to allow both the vehicle operator and network manager to monitor the location and surrounding environment of a transport vehicle during shipment.

  19. Power monitoring and control for large scale projects: SKA, a case study

    Science.gov (United States)

    Barbosa, Domingos; Barraca, João. Paulo; Maia, Dalmiro; Carvalho, Bruno; Vieira, Jorge; Swart, Paul; Le Roux, Gerhard; Natarajan, Swaminathan; van Ardenne, Arnold; Seca, Luis

    2016-07-01

    Large sensor-based science infrastructures for radio astronomy like the SKA will be among the most intensive datadriven projects in the world, facing very high demanding computation, storage, management, and above all power demands. The geographically wide distribution of the SKA and its associated processing requirements in the form of tailored High Performance Computing (HPC) facilities, require a Greener approach towards the Information and Communications Technologies (ICT) adopted for the data processing to enable operational compliance to potentially strict power budgets. Addressing the reduction of electricity costs, improve system power monitoring and the generation and management of electricity at system level is paramount to avoid future inefficiencies and higher costs and enable fulfillments of Key Science Cases. Here we outline major characteristics and innovation approaches to address power efficiency and long-term power sustainability for radio astronomy projects, focusing on Green ICT for science and Smart power monitoring and control.

  20. Applicability of the "Frame of Reference" approach for environmental monitoring of offshore renewable energy projects.

    Science.gov (United States)

    Garel, Erwan; Rey, Cibran Camba; Ferreira, Oscar; van Koningsveld, Mark

    2014-08-01

    This paper assesses the applicability of the Frame of Reference (FoR) approach for the environmental monitoring of large-scale offshore Marine Renewable Energy (MRE) projects. The focus is on projects harvesting energy from winds, waves and currents. Environmental concerns induced by MRE projects are reported based on a classification scheme identifying stressors, receptors, effects and impacts. Although the potential effects of stressors on most receptors are identified, there are large knowledge gaps regarding the corresponding (positive and negative) impacts. In that context, the development of offshore MRE requires the implementation of fit-for-purpose monitoring activities aimed at environmental protection and knowledge development. Taking European legislation as an example, it is suggested to adopt standardized monitoring protocols for the enhanced usage and utility of environmental indicators. Towards this objective, the use of the FoR approach is advocated since it provides guidance for the definition and use of coherent set of environmental state indicators. After a description of this framework, various examples of applications are provided considering a virtual MRE project located in European waters. Finally, some conclusions and recommendations are provided for the successful implementation of the FoR approach and for future studies. Copyright © 2014 Elsevier Ltd. All rights reserved.

  1. An applications guide to vehicle SNM monitors

    International Nuclear Information System (INIS)

    Fehlau, P.E.

    1987-03-01

    The applications guide introduces its readers to the vehicle special nuclear material (SNM) monitors that are becoming part of safeguards and security measures for nuclear material control at DOE facilities. Building on the foundation provided by an applications guide to pedestrian SNM monitors published in 1986 and a technical report on vehicle monitoring published in 1982, the guide provides an overview of vehicle monitoring in Part 1, a discussion of technical aspects of vehicle monitoring in Part 2, and a catalog of vehicle SNM monitors available to DOE facilities in Part 3. Vehicle monitor upkeep, calibration, testing, and performance are important topics in Part 1. The short technical discussion in Part 2 is devoted to new developments and unique features of vehicle monitors

  2. Engineering Technical Support Center Annual Report Fiscal ...

    Science.gov (United States)

    The United States Environmental Protection Agency (EPA or Agency) Office of Research and Development (ORD) created the Engineering Technical Support Center (ETSC) in 1987, one of several technical support centers created as part of the Technical Support Project (TSP). ETSC provides engineering expertise to Agency program and regional offices and remediation teams working at contaminated sites across the country. The ETSC is operated within ORD’s Land Remediation and Pollution Control Division (LRPCD) of the National Risk Management Research Laboratory (NRMRL) in Cincinnati, Ohio. The ETSC’s mission is to provide site-specific scientific and engineering technical support to Remedial Project Managers, On-Scene Coordinators, and other remediation personnel at contaminated sites. This allows local, regional, or national authorities to work more quickly, efficiently, and cost effectively, while also increasing the technical experience of the remediation team. Since its inception, the ETSC has supported countless projects across all EPA Regions in almost all states and territories. This report highlights significant projects the ETSC supported in fiscal year 2015 (FY15). These projects addressed an array of environmental scenarios, such as remote mining contamination, expansive landfill waste, cumulative impacts from multiple contamination sources, and persistent threats from abandoned industrial sites. Constructing and testing new and innovative treatment technol

  3. Adapting Project Management Practices to Research-Based Projects

    Science.gov (United States)

    Bahr, P.; Baker, T.; Corbin, B.; Keith, L.; Loerch, L.; Mullenax, C.; Myers, R.; Rhodes, B.; Skytland, N.

    2007-01-01

    From dealing with the inherent uncertainties in outcomes of scientific research to the lack of applicability of current NASA Procedural Requirements guidance documentation, research-based projects present challenges that require unique application of classical project management techniques. If additionally challenged by the creation of a new program transitioning from basic to applied research in a technical environment often unfamiliar with the cost and schedule constraints addressed by project management practices, such projects can find themselves struggling throughout their life cycles. Finally, supplying deliverables to a prime vehicle customer, also in the formative stage, adds further complexity to the development and management of research-based projects. The Biomedical Research and Countermeasures Projects Branch at NASA Johnson Space Center encompasses several diverse applied research-based or research-enabling projects within the newly-formed Human Research Program. This presentation will provide a brief overview of the organizational structure and environment in which these projects operate and how the projects coordinate to address and manage technical requirements. We will identify several of the challenges (cost, technical, schedule, and personnel) encountered by projects across the Branch, present case reports of actions taken and techniques implemented to deal with these challenges, and then close the session with an open forum discussion of remaining challenges and potential mitigations.

  4. A pilot project combining multispectral proximal sensors and digital cameras for monitoring tropical pastures

    Science.gov (United States)

    Handcock, Rebecca N.; Gobbett, D. L.; González, Luciano A.; Bishop-Hurley, Greg J.; McGavin, Sharon L.

    2016-08-01

    Timely and accurate monitoring of pasture biomass and ground cover is necessary in livestock production systems to ensure productive and sustainable management. Interest in the use of proximal sensors for monitoring pasture status in grazing systems has increased, since data can be returned in near real time. Proximal sensors have the potential for deployment on large properties where remote sensing may not be suitable due to issues such as spatial scale or cloud cover. There are unresolved challenges in gathering reliable sensor data and in calibrating raw sensor data to values such as pasture biomass or vegetation ground cover, which allow meaningful interpretation of sensor data by livestock producers. Our goal was to assess whether a combination of proximal sensors could be reliably deployed to monitor tropical pasture status in an operational beef production system, as a precursor to designing a full sensor deployment. We use this pilot project to (1) illustrate practical issues around sensor deployment, (2) develop the methods necessary for the quality control of the sensor data, and (3) assess the strength of the relationships between vegetation indices derived from the proximal sensors and field observations across the wet and dry seasons. Proximal sensors were deployed at two sites in a tropical pasture on a beef production property near Townsville, Australia. Each site was monitored by a Skye SKR-four-band multispectral sensor (every 1 min), a digital camera (every 30 min), and a soil moisture sensor (every 1 min), each of which were operated over 18 months. Raw data from each sensor was processed to calculate multispectral vegetation indices. The data capture from the digital cameras was more reliable than the multispectral sensors, which had up to 67 % of data discarded after data cleaning and quality control for technical issues related to the sensor design, as well as environmental issues such as water incursion and insect infestations. We recommend

  5. National inventory of selected biological monitoring programs. Summary report of current or recently completed projects, 1976

    Energy Technology Data Exchange (ETDEWEB)

    Kemp, H. T.

    1976-10-01

    The Inventory has resulted in establishment of a series of data bases containing biological monitoring information of varying types, namely, directory of investigators, record of projects received from mail questionnaire, detailed description of selected biomonitoring projects, and bibliographic citations supporting the projects received. This report contains detailed descriptions of selected biomonitoring projects organized on a state-by-state basis and with appropriate indices.

  6. Transformation of technical infrastructure

    DEFF Research Database (Denmark)

    Nielsen, Susanne Balslev

    , the evolution of large technological systems and theories about organisational and technological transformationprocesses. The empirical work consist of three analysis at three different levels: socio-technical descriptions of each sector, an envestigation of one municipality and envestigations of one workshop......The scope of the project is to investigate the possibillities of - and the barriers for a transformation of technical infrastructure conserning energy, water and waste. It focus on urban ecology as a transformation strategy. The theoretical background of the project is theories about infrastructure...

  7. Large scale photovoltaic field trials. Second technical report: monitoring phase

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2007-09-15

    This report provides an update on the Large-Scale Building Integrated Photovoltaic Field Trials (LS-BIPV FT) programme commissioned by the Department of Trade and Industry (Department for Business, Enterprise and Industry; BERR). It provides detailed profiles of the 12 projects making up this programme, which is part of the UK programme on photovoltaics and has run in parallel with the Domestic Field Trial. These field trials aim to record the experience and use the lessons learnt to raise awareness of, and confidence in, the technology and increase UK capabilities. The projects involved: the visitor centre at the Gaia Energy Centre in Cornwall; a community church hall in London; council offices in West Oxfordshire; a sports science centre at Gloucester University; the visitor centre at Cotswold Water Park; the headquarters of the Insolvency Service; a Welsh Development Agency building; an athletics centre in Birmingham; a research facility at the University of East Anglia; a primary school in Belfast; and Barnstable civic centre in Devon. The report describes the aims of the field trials, monitoring issues, performance, observations and trends, lessons learnt and the results of occupancy surveys.

  8. Technical Basis for Implementation of the PCM-1B for Personnel Release at Tank Farms

    International Nuclear Information System (INIS)

    BROWN, R.L.

    1999-01-01

    The purpose of this document is to define the technical basis and implementing guidelines for using automated personnel contamination monitors, such as the PCM-1B, at the River Protection Project (RPP) in lieu of performing a hand-held instrument followed by a PCM-1B survey for personnel release from contamination areas requiring a beta-gamma whole body survey. This document provides the basis for full implementation of the PCM-1B release survey, without the supplemental hand and foot survey, as currently implemented at RPP. This document applies only to RPP facilities. This document does not provide the technical basis for determining the equivalency of an automated system to hand-held instruments, or to the effective counting capability of automated systems as such technical determinations are contained in TBTN: GDGH-9604-RLS-0015

  9. Carmel River Lagoon Enhancement Project: Water Quality and Aquatic Wildlife Monitoring, 2006-7

    OpenAIRE

    Perry, William; Watson, Fred; Casagrande, Joel; Hanley, Charles

    2007-01-01

    This is a report to the California Department of Parks and Recreation. It describes water quality and aquatic invertebrate monitoring after the construction of the Carmel River Lagoon Enhancement Project. Included are data that have been collected for two years and preliminary assessment of the enhanced ecosystem. This report marks the completion of 3-years of monitoring water quality and aquatic habitat. The report adopts the same format and certain background text from previous ...

  10. Sustainable Seas Student Intertidal Monitoring Project, Duxbury Reef, Bolinas, CA

    Science.gov (United States)

    Soave, K.; Dean, A.; Prescutti, K.; Ball, O.; Chang, E.; Darakananda, K.; Jessup, K.; Poutian, J.; Schwalbe, H.; Storm, E.

    2008-12-01

    The Sustainable Seas Student Monitoring Project at the Branson School in Ross, CA has monitored Duxbury Reef in Bolinas, CA since 1999, in cooperation with the Farallones Marine Sanctuary Association and the Gulf of Farallones National Marine Sanctuary. Goals of the project include: 1) To monitor the rocky intertidal habitat and develop a baseline database of invertebrates and algal density and abundance; 2) To contribute to the conservation of the rocky intertidal habitat through education of students and visitors about intertidal species and requirements for maintaining a healthy, diverse intertidal ecosystem; 3) To increase stewardship in the Gulf of the Farallones National Marine Sanctuary; and 4) To contribute abundance and population data on key algae and invertebrate species to the national database, LiMPETS (Long Term Monitoring Program and Experiential Training for Students). Student volunteers complete an intensive training course on the natural history of intertidal invertebrates and algae, identification of key species, rocky intertidal ecology, interpretation and monitoring techniques, and history of the sanctuary. Students identify and count key invertebrate and algae species along two permanent transects (A and B), and using randomly determined points within a permanent 100 m2 area, three times per year (fall, winter, and late spring). Using the data collected since 2004, we will analyze the population densities of aggregating anemones, Anthopleura elegantissima, for seasonal abundance variations as well as long-term population trends. We will also follow the seasonal and long-term population fluctuations of red algal turf, Endocladia muricata and Gelidium coulteri, and black turban snails, Tegula funebralis. Comparing populations of turf algae and the herbivorous black turban snails gathered before and after the November 7, 2007 San Francisco Bay oil spill shows very little impact on the Duxbury Reef intertidal inhabitants. Future analyses will

  11. The Development of K-8 Progress Monitoring Measures in Mathematics for Use with the 2% and General Education Populations: Grade 3. Technical Report # 09-02

    Science.gov (United States)

    Alonzo, Julie; Lai, Cheng Fei; Tindal, Gerald

    2009-01-01

    In this technical report, we describe the development and piloting of a series of mathematics progress monitoring measures intended for use with students in grades kindergarten through eighth grade. These measures, available as part of easyCBM[TM], an online progress monitoring assessment system, were developed in 2007 and 2008 and administered to…

  12. The Development of K-8 Progress Monitoring Measures in Mathematics for Use with the 2% and General Education Populations: Grade 5. Technical Report # 09-01

    Science.gov (United States)

    Lai, Cheng Fei; Alonzo, Julie; Tindal, Gerald

    2009-01-01

    In this technical report, we describe the development and piloting of a series of mathematics progress monitoring measures intended for use with students in grades kindergarten through eighth grade. These measures, available as part of easyCBM[TM], an online progress monitoring assessment system, were developed in 2007 and 2008 and administered to…

  13. The Development of K-8 Progress Monitoring Measures in Mathematics for Use with the 2% and General Education Populations: Grade 4. Technical Report # 09-03

    Science.gov (United States)

    Alonzo, Julie; Lai, Cheng Fei; Tindal, Gerald

    2009-01-01

    In this technical report, we describe the development and piloting of a series of mathematics progress monitoring measures intended for use with students in grades kindergarten through eighth grade. These measures, available as part of easyCBM[TM], an online progress monitoring assessment system, were developed in 2007 and 2008 and administered to…

  14. The Development of K-8 Progress Monitoring Measures in Mathematics for Use with the 2% and General Education Populations: Grade 8. Technical Report # 09-04

    Science.gov (United States)

    Lai, Cheng Fei; Alonzo, Julie; Tindal, Gerald

    2009-01-01

    In this technical report, we describe the development and piloting of a series of mathematics progress monitoring measures intended for use with students in grades kindergarten through eighth grade. These measures, available as part of easyCBM[TM], an online progress monitoring assessment system, were developed in 2007 and 2008 and administered to…

  15. Tribal Colleges and Universitie/American Indian Higher Education Consortium Advanced Manufacturing Technical Assistance Project

    Energy Technology Data Exchange (ETDEWEB)

    Atcitty, Stanley [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2017-09-01

    The National Nuclear Security Agency (NNSA) created a Minority Serving Institution Partnership Plan (MSIPP) to 1) align investments in a university capacity and workforce development with the NNSA mission to develop the needed skills and talent for NNSA’s enduring technical workforce at the laboratories and production plants and 2) to enhance research and education at under-represented colleges and universities. Out of this effort, MSIPP launched a new program in early FY17 focused on Tribal Colleges and Universities (TCUs). The following report summarizes the project focus and status update during this reporting period.

  16. Tribal Colleges and Universitie/American Indian Higher Education Consortium Advanced Manufacturing Technical Assistance Project.

    Energy Technology Data Exchange (ETDEWEB)

    Atcitty, Stanley [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2018-02-01

    The National Nuclear Security Agency (NNSA) created a Minority Serving Institution Partnership Plan (MSIPP) to 1) align investments in a university capacity and workforce development with the NNSA mission to develop the needed skills and talent for NNSA’s enduring technical workforce at the laboratories and production plants and 2) to enhance research and education at under-represented colleges and universities. Out of this effort, MSIPP launched a new program in early FY17 focused on Tribal Colleges and Universities (TCUs). The following report summarizes the project focus and status update during this reporting period.

  17. Proposed radioactive liquid effluent monitoring requirements at the Savannah River Site

    International Nuclear Information System (INIS)

    Jannik, G.T.; Carlton, W.H.; Blunt, B.C.

    1994-01-01

    Clear regulatory guidance exists for structuring a radiological air monitoring program, however, there is no parallel guidance for radiological liquid monitoring. For Department of Energy (DOE) facilities, there are no existing applicable federal regulations, DOE orders, or DOE guidance documents that specify at what levels continuous monitoring, continuous sampling, or periodic confirmatory measurements of radioactive liquid effluents must be made. In order to bridge this gap and to technically justify and document liquid effluent monitoring decisions at DOE's Savannah River Site, Westinghouse Savannah River Company has proposed that a graded, dose-based approach be established, in conjunction with limits on facility radionuclide inventories, to determine the monitoring and sampling criteria to be applied at each potential liquid radioactive effluent point. The graded approach would be similar to--and a conservative extension of--the existing, agreed-upon SRS/EPA-IV airborne effluent monitoring approach documented in WSRC's NESHAP Quality Assurance Project Plan. The limits on facility radionuclide inventories are based on--and are a conservative extension of--the 10 CFR 834, 10 CFR 20, and SCR 61-63 annual limits on discharges to sanitary sewers. Used in conjunction with each other, the recommended source category criteria levels and facility radionuclide inventories would allow for the best utilization of resources and provide consistent, technically justifiable determinations of radioactive liquid effluent monitoring requirements

  18. RadSTraM: Radiological Source Tracking and Monitoring, Phase II Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Warren, Tracy A [ORNL; Walker, Randy M [ORNL; Hill, David E [ORNL; Gross, Ian G [ORNL; Smith, Cyrus M [ORNL; Abercrombie, Robert K [ORNL

    2008-12-01

    This report focuses on the technical information gained from the Radiological Source Tracking and Monitoring (RadSTraM) Phase II investigation and its implications. The intent of the RadSTraM project was to determine the feasibility of tracking radioactive materials in commerce, particularly International Atomic Energy Agency (IAEA) Category 3 and 4 materials. Specifically, Phase II of the project addressed tracking radiological medical isotopes in commerce. These categories of materials are susceptible to loss or theft but the problem is not being addressed by other agencies.

  19. RadSTraM: Radiological Source Tracking and Monitoring, Phase II Final Report

    International Nuclear Information System (INIS)

    Warren, Tracy A.; Walker, Randy M.; Hill, David E.; Gross, Ian G.; Smith, Cyrus M.; Abercrombie, Robert K.

    2008-01-01

    This report focuses on the technical information gained from the Radiological Source Tracking and Monitoring (RadSTraM) Phase II investigation and its implications. The intent of the RadSTraM project was to determine the feasibility of tracking radioactive materials in commerce, particularly International Atomic Energy Agency (IAEA) Category 3 and 4 materials. Specifically, Phase II of the project addressed tracking radiological medical isotopes in commerce. These categories of materials are susceptible to loss or theft but the problem is not being addressed by other agencies

  20. Advanced Mixed Waste Treatment Project melter system preliminary design technical review meeting

    Energy Technology Data Exchange (ETDEWEB)

    Eddy, T.L.; Raivo, B.D.; Soelberg, N.R.; Wiersholm, O.

    1995-02-01

    The Idaho National Engineering Laboratory Advanced Mixed Waste Treatment Project sponsored a plasma are melter technical design review meeting to evaluate high-temperature melter system configurations for processing heterogeneous alpha-contaminated low-level radioactive waste (ALLW). Thermal processing experts representing Department of Energy contractors, the Environmental Protection Agency, and private sector companies participated in the review. The participants discussed issues and evaluated alternative configurations for three areas of the melter system design: plasma torch melters and graphite arc melters, offgas treatment options, and overall system configuration considerations. The Technical Advisory Committee for the review concluded that graphite arc melters are preferred over plasma torch melters for processing ALLW. Initiating involvement of stakeholders was considered essential at this stage of the design. For the offgas treatment system, the advisory committee raised the question whether to a use wet-dry or a dry-wet system. The committee recommended that the waste stream characterization, feed preparation, and the control system are essential design tasks for the high-temperature melter treatment system. The participants strongly recommended that a complete melter treatment system be assembled to conduct tests with nonradioactive surrogate waste material. A nonradioactive test bed would allow for inexpensive design and operational changes prior to assembling a system for radioactive waste treatment operations.

  1. Advanced Mixed Waste Treatment Project melter system preliminary design technical review meeting

    International Nuclear Information System (INIS)

    Eddy, T.L.; Raivo, B.D.; Soelberg, N.R.; Wiersholm, O.

    1995-02-01

    The Idaho National Engineering Laboratory Advanced Mixed Waste Treatment Project sponsored a plasma are melter technical design review meeting to evaluate high-temperature melter system configurations for processing heterogeneous alpha-contaminated low-level radioactive waste (ALLW). Thermal processing experts representing Department of Energy contractors, the Environmental Protection Agency, and private sector companies participated in the review. The participants discussed issues and evaluated alternative configurations for three areas of the melter system design: plasma torch melters and graphite arc melters, offgas treatment options, and overall system configuration considerations. The Technical Advisory Committee for the review concluded that graphite arc melters are preferred over plasma torch melters for processing ALLW. Initiating involvement of stakeholders was considered essential at this stage of the design. For the offgas treatment system, the advisory committee raised the question whether to a use wet-dry or a dry-wet system. The committee recommended that the waste stream characterization, feed preparation, and the control system are essential design tasks for the high-temperature melter treatment system. The participants strongly recommended that a complete melter treatment system be assembled to conduct tests with nonradioactive surrogate waste material. A nonradioactive test bed would allow for inexpensive design and operational changes prior to assembling a system for radioactive waste treatment operations

  2. Technical Challenge and Demonstration of Advanced Solution Monitoring and Measurement System (ASMS)

    International Nuclear Information System (INIS)

    Takaya, A.; Mukai, Y.; Nakamura, H.; Hosoma, T.; Yoshimoto, K.; Tamura, T.; Iwamoto, T.

    2010-01-01

    JNFL and JAEA have collaboratively started to develop an Advanced Solution Measurement and monitoring System (ASMS) as a part of technical challenge intended for next generation safeguards NDA equipment. After we completed feasibility study by using small detectors, the second stage of ASMS has installed into PCDF tank located in a cell, and then tested and calibrated by Pu nitrate solution experimentally. There was no experience measuring around 50kg Pu inventory directly, so it was very challenging work. The conventional SMMS (Solution Monitoring and Measurement System) that is composed of precision manometers acquires density, level and temperature of solution, so that the sampling and analysis are essential to obtain the nuclear material amount in the tank. The SMMS has two weak points on verification and monitoring of the nuclear material flow and inventory; (1) Direct measurement of the inventory cannot be done, (2) Solution rework and reagent adjustment operation in actual plant will make miss-interpretation on the monitoring evaluation. The purpose of ASMS development is to establish quantitative plutonium mass measurement technique directly by NDA of high concentrated pure plutonium nitrate solution and monitoring capability for solution transfers in a process. The merits of ASMS are considered below; (1) Provide direct Pu measurement and continuous monitoring capability, (2) Eliminate sampling and analysis at IIV, (3) Reduce unmeasured inventory. The target of the measurement uncertainty of ASMS is set less than 6% (1sigma) which is equivalent to meet the detection level of the partial defect at IIV by NDA. Known-alpha coincidence counting technique is applied to the ASMS, which is similar to the NDAs for MOX powder as a principle measurement technique. Especially, three following points are key techniques to establish ASMS. (1) Pre-determination of plutonium isotopic composition because it impacts alpha and rho-zero values to obtain multiplication

  3. Study and project of a radiation monitoring system in ships

    International Nuclear Information System (INIS)

    Morgado, Mario Monteiro

    1998-01-01

    In this work we present the project and the development of a radiation detection system for use in ships, called RADINAC. This system was developed to measure the radiation in several points of the ship and to give the dose rates and total dose. The radioactive activity of the sea water is also measured. The project was based on a system developed in the middle of the seventies which is not working due to the lack of some mechanical and electronic components. The RADINAC system was developed in order to nationalize and modernize the old project. The detectors used are plastic scintillator to measure the sea water radioactive activity and ionization chambers to measure the dose rates. The nuclear instrumentation has only three imported items: acquisition data board, picoamperimeter and photomultiplier tube. All the other items are made in Brazil. With regard to the data acquisition, we used the Labwindows software to create the 'virtual instruments' in order to display the data on the computer monitor. (author)

  4. The SISMA Project: A pre-operative seismic hazard monitoring system.

    Science.gov (United States)

    Massimiliano Chersich, M. C.; Amodio, A. A. Angelo; Francia, A. F. Andrea; Sparpaglione, C. S. Claudio

    2009-04-01

    Galileian Plus is currently leading the development, in collaboration with several Italian Universities, of the SISMA (Seismic Information System for Monitoring and Alert) Pilot Project financed by the Italian Space Agency. The system is devoted to the continuous monitoring of the seismic risk and is addressed to support the Italian Civil Protection decisional process. Completion of the Pilot Project is planned at the beginning of 2010. Main scientific paradigm of SISMA is an innovative deterministic approach integrating geophysical models, geodesy and active tectonics. This paper will give a general overview of project along with its progress status and a particular focus will be put on the architectural design details and to the software implementation choices. SISMA is built on top of a software infrastructure developed by Galileian Plus to integrate the scientific programs devoted to the update of seismic risk maps. The main characteristics of the system may be resumed as follow: automatic download of input data; integration of scientific programs; definition and scheduling of chains of processes; monitoring and control of the system through a graphical user interface (GUI); compatibility of the products with ESRI ArcGIS, by mean of post-processing conversion. a) automatic download of input data SISMA needs input data such as GNSS observations, updated seismic catalogue, SAR satellites orbits, etc. that are periodically updated and made available from remote servers through FTP and HTTP. This task is accomplished by a dedicated user configurable component. b) integration of scientific programs SISMA integrates many scientific programs written in different languages (Fortran, C, C++, Perl and Bash) and running into different operating systems. This design requirements lead to the development of a distributed system which is platform independent and is able to run any terminal-based program following few simple predefined rules. c) definition and scheduling of

  5. Technical requirements for implementation of an individual monitoring service for evaluation of operational quantity HP(10) using thermoluminescent dosimetry

    International Nuclear Information System (INIS)

    Francisco, Adelaide Benedita Armando

    2016-01-01

    This work aims to establish technical requirements for the development of a TLDs system for the assessment of operational quantity H P (10), in order to implement an external individual monitoring service in countries who do not have. This allows a better understanding of the technic and the thermoluminescent dosimetry system, thus contributing to identify the technical criteria to be followed by a dosimetry laboratory and evaluation of the dosimetric system performance. For this, the review of the specific literature of the dosimetry field was conducted and later the type and performance tests that must be followed by a dosimetric system were reproduced in practice. In additional was made a analysis of internationals standards norms and the technical regulation used in Brazil, to define the essentials type testes to a dosimetric system. To check the performance of a dosimetry system, a performance analysis of the Brazilian TLDs system was carried out over the past 6 years using the trumpet curve, where it was observed that most of TLDs system, in this review period, were approved and have excellent performance. The technical requirements for the development of a thermoluminescent dosimetry system ensure that the system provides technically reliable results and allow demonstration of compliance with the standard criteria established by national and international standards, and the implementation of the dosimetry system, is verified the compliance of the annual doses limits set for occupationally exposed. (author)

  6. Development plan. High activity-long living wastes project. Abstract

    International Nuclear Information System (INIS)

    2007-01-01

    This brochure presents the actions that the ANDRA (the French national agency of radioactive wastes) has to implement in the framework of the project of high activity-long living (HALL) radioactive wastes (HAVL project) conformably to the requirements of the program defined in the law from June 28, 2006 (law no 2006-739). This law precises the three, complementary, research paths to explore for the management of this type of wastes: separation and transmutation of long-living radioactive elements, reversible disposal in deep geologic underground, and long duration storage. The ANDRA's action concerns the geologic disposal aspect. The following points are presented: the HALL wastes and their containers, the reversible disposal procedure, the HAVL project: financing of researches, storage concepts, development plan of the project (dynamics, information and dialogue approach, input data, main steps, schedule); the nine programs of the HAVL project (laboratory experiments and demonstration tests, surface survey, scientific program, simulation program, surface engineering studies and technological tests, information and communication program, program of environment and facilities surface observation and monitoring, waste packages management, monitoring and transport program, disposal program); the five transverse technical and scientific activities (safety, reversibility, cost, health and occupational safety, impact study). (J.S.)

  7. Integrated Monitoring and Surveillance System demonstration project. Phase 2 accomplishments

    International Nuclear Information System (INIS)

    Aumeier, S.E.; Walters, B.G.; Singleterry, R.C.

    1997-01-01

    The paper presents the results of the Integrated Monitoring and Surveillance System (IMSS) demonstration project Phase 2 efforts. the rationale behind IMSS development is reviewed and progress in each of the 5 basic tasks is detailed. Significant results include further development of the data acquisition system and procurement of necessary hardware/software, options and associated costs for plutonium canning systems and gloveboxes, initiation of facility modifications, determination of possibly affected facility documentation, results from sensor system trade study, and preliminary storage configuration designs. Resources invested during Phase 1 and Phase 2 are summarized and budgetary requirements for completion of Phase 3 presented. The results show that the IMSS demonstration project team has met and in many cases exceeded the commitments made for Phase 2 deliverables

  8. Project Management Communication 2.0

    DEFF Research Database (Denmark)

    Berggreen, Line; Kampf, Constance Elizabeth

    2015-01-01

    How can we understand project management communication practices for developing effective practices in professional and technical communication? In this article we explore an approach to project management that focuses on projects as having a technical documentation structure with content...... that is developed through social or interpersonal communication practices. Looking at the broader picture of project management which besides the implementation phase also includes conception, planning and closure, we see a project management framework that brings together both technical and social aspects...... of project communication. To understand how this works, we interviewed project managers about their understanding and strategy in communicating about the projects they lead. Findings demonstrate that more experienced project managers have a more nuanced understanding of project communication as both...

  9. Evaluation and monitoring of wild/natural steelhead trout production: project progress report, 1996; ANNUAL

    International Nuclear Information System (INIS)

    Leth, Brian D.; Holubetz, Terry; Nemeth, Doug

    2000-01-01

    This project was initiated to provide additional, and more definitive, information regarding wild steelhead Oncorhynchus mykiss populations in Idaho. Important streams for wild steelhead production were identified and selected for monitoring. Monitoring activities employed among streams varied, but generally included: aerial redd counts, placement of adult weirs, enumeration of juveniles through mask and snorkel counts, and emigrant trapping. This report details activities during the 1996 field season

  10. Using Geoscience and Geostatistics to Optimize Groundwater Monitoring Networks at the Savannah River Site

    International Nuclear Information System (INIS)

    Tuckfield, R.C.

    2001-01-01

    A team of scientists, engineers, and statisticians was assembled to review the operation efficiency of groundwater monitoring networks at US Department of Energy Savannah River Site (SRS). Subsequent to a feasibility study, this team selected and conducted an analysis of the A/M area groundwater monitoring well network. The purpose was to optimize the number of groundwater wells requisite for monitoring the plumes of the principal constituent of concern, viz., trichloroethylene (TCE). The project gathered technical expertise from the Savannah River Technology Center (SRTC), the Environmental Restoration Division (ERD), and the Environmental Protection Department (EPD) of SRS

  11. Trace of the 'Fugen' project. Its technical development results to be succeeded

    International Nuclear Information System (INIS)

    Ishikure, Kenkichi; Kikuchi, Saburo; Kobayashi, Hiromasa; Hino, Minoru

    2003-01-01

    A prototype reactor of the advanced thermal reactor (ATR), 'Fugen' will be finished its operation on March, 2003. And, the 'Fugen' project advanced by self technology development has largely contributed to nuclear energy development in Japan at various fields. Nuclear energy is now laid at change of its environment without previous experiences, such as relaxation of regulation, liberalization of electric powers, cost down, and so on. A history on challenge of self technology development must be valuable experiences essential for present and future nuclear energy. To succeed results with and without shapes obtained by the 'Fugen', to generation sharing coming future, here were investigated verifications on its technical results and self technology development results and how their results are activated to future. (G.K.)

  12. NASA/DOD Aerospace Knowledge Diffusion Research Project. Paper 33: Technical communications practices and the use of information technologies as reported by Dutch and US aerospace engineers

    Science.gov (United States)

    Barclay, Rebecca O.; Pinelli, Thomas E.; Tan, Axel S. T.; Kennedy, John M.

    1993-01-01

    As part of Phase 4 of the NASA/DOD Aerospace Knowledge Diffusion Research Project, two studies were conducted that investigated the technical communications practices of Dutch and U.S. aerospace engineers and scientists. A self-administered questionnaire was distributed to aerospace engineers and scientists at the National Aerospace Laboratory (The Netherlands), and NASA ARC (U.S.), and NASA LaRC (U.S.). This paper presents responses of the Dutch and U.S. participants to selected questions concerning four of the seven project objectives: determining the importance of technical communications to aerospace engineering professionals, investigating the production of technical communications, examining the use and importance of computer and information technology, and exploring the use of electronic networks.

  13. DECOVALEX II PROJECT. Technical report - Task 2A and 2B. (Revised edition)

    International Nuclear Information System (INIS)

    Lanru Jing; Stephansson, Ove

    1998-08-01

    DECOVALEX II project started in November 1995 as a continuation of the DECOVALEX I project, which was completed at the end of 1994. The project was initiated by recognizing the fact that a proper evaluation of the current capacities of numerical modelling of the coupled T-H-M processes in fractured media is needed not only for small scale, well controlled laboratory test cases such as those studied in DECOVALEX 1, but also for less characterised, more complex and realistic in-situ experiments. This will contribute to validation and confidence building in the current mathematical models, numerical methods and computer codes. Four tasks were defined in the DECOVALEX II project: TASK 1 - numerical study of the RCF3 pumping test and shaft excavation at Sellafield by Nirex, UK; TASK 2 - numerical study of the in-situ T-H-M experiments at Kamaishi Mine by PNC, Japan; TASK 3 - review of current state-of-the-art of rock joint research and TASK 4 - report on the coupled T-H-M issues related to repository design and performance assessment. This report is one of the technical reports of the DECOVALEX II project, describing the work performed for TASK 2A and 2B - the predictions and model calibration for the hydro-mechanical effect of the excavation of the test pit for the in-situ T-H-M experiments at Kamaishi Mine by PNC, Japan. Presented in this report are the descriptions of the project, definition of Task 2, and approaches, methods and results of numerical modelling work carried out by the research teams. The report is a summary of the research reports written by the research teams and the discussions held during project workshops and task force group meetings. The opinions and conclusions in this report, however, reflect only ideas of the authors, not necessarily a collective representation of the funding organisations of the project

  14. A Synopsis of Technical Issues of Concern for Monitoring Trace Elements in Highway and Urban Runoff

    Science.gov (United States)

    Breault, Robert F.; Granato, Gregory E.

    2000-01-01

    Trace elements, which are regulated for aquatic life protection, are a primary concern in highway- and urban-runoff studies because stormwater runoff may transport these constituents from the land surface to receiving waters. Many of these trace elements are essential for biological activity and become detrimental only when geologic or anthropogenic sources exceed concentrations beyond ranges typical of the natural environment. The Federal Highway Administration and State Transportation Agencies are concerned about the potential effects of highway runoff on the watershed scale and for the management and protection of watersheds. Transportation agencies need information that is documented as valid, current, and scientifically defensible to support planning and management decisions. There are many technical issues of concern for monitoring trace elements; therefore, trace-element data commonly are considered suspect, and the responsibility to provide data-quality information to support the validity of reported results rests with the data-collection agency. Paved surfaces are fundamentally different physically, hydraulically, and chemically from the natural surfaces typical of most freshwater systems that have been the focus of many traceelement- monitoring studies. Existing scientific conceptions of the behavior of trace elements in the environment are based largely upon research on natural systems, rather than on systems typical of pavement runoff. Additionally, the logistics of stormwater sampling are difficult because of the great uncertainty in the occurrence and magnitude of storm events. Therefore, trace-element monitoring programs may be enhanced if monitoring and sampling programs are automated. Automation would standardize the process and provide a continuous record of the variations in flow and water-quality characteristics. Great care is required to collect and process samples in a manner that will minimize potential contamination or attenuation of trace

  15. Overview of ISTC projects related to the environment

    International Nuclear Information System (INIS)

    Meyer, U.

    2002-01-01

    The field of ENVIRONMENT is the largest of the 14 technology areas within the International Science and Technology Center (ISTC). As of June 2000, more than 160 environmental projects have been selected for funding; this equals about 19% of all approved ISTC projects, one of the highest of all ISTC application areas. Provided funds total about US $55 million, 22% of the ISTC's allocated budget. The statistics verify that ENVIRONMENT is the most active technical area in reviews and funding in the ISTC. In general terms, this fact documents the strong interest of the financing parties in environmental purposes and indicates their desire to support the effort in the development of improved processes and innovative technologies for the solution of urgent environmental problems and for their future prevention in the CIS. The content and objectives of the approved projects include the following topics: Radioactive Waste Treatment and Disposal, Monitoring and Instrumentation, Modeling and Risk Assessment, Remediation and Decontamination, Environmental Health and Safety, Seismic Monitoring, and Pollution of Air and Water. The projects are devoted to nuclear and nonnuclear environmental issues in similar proportion. (author)

  16. Technical evaluation of bids for nuclear power plants

    International Nuclear Information System (INIS)

    1981-01-01

    In continuation of its efforts to provide comprehensive and impartial guidance to Member States facing the need to introduce nuclear power, the International Atomic Energy Agency is issuing this guidebook as part of a series of guidebooks and codes of practice and, in particular, as a necessary supplement to 'Economic Evaluation of Bids for Nuclear Power Plants: A Guidebook', published by the IAEA in 1976 as Technical Reports Series No.175. The present publication is intended for project managers and senior engineers of electric utilities who are concerned with the evaluation of bids for a nuclear power project. It assumes that the reader has a good knowledge of the technical characteristics of nuclear power plants and of nuclear power project implementation. Its purpose is to provide the information necessary to organize, guide and supervise the technical evaluation of bids for a nuclear power project. It goes without saying that the technical staff carrying out the evaluation must have prior technical experience which cannot be provided by a guidebook

  17. Vincent Vuillemin: Consolidating CERN’s technical base

    CERN Multimedia

    2009-01-01

    Former head of the Technical Support Department, Vincent Vuillemin is pursuing his mission as the head of the new Engineering Department. The remodelled department is working towards the resumption of LHC operations, on the Laboratory’s numerous projects and consolidation of the existing facilities. Vincent Vuillemin studies the table spread out on his broad office desk, showing his department’s projects. Red shows top-priority projects, blue is for projects under development and yellow is for future projects. Of course, the top red slot is reserved for the LHC. "Getting the LHC back into service is our absolute top priority," states Vuillemin. Whenever a technical difficulty arose with the LHC project—from defects in the cryogenic distribution line to the manufacturing problems that affected the collimators—the teams of the Technical Support Department (TS), now the Engineering Department (EN), were at the forefront, making u...

  18. The LIFE ProjectMonitoring of insects with public participation” (MIPP: aims, methods and conclusions

    Directory of Open Access Journals (Sweden)

    Giuseppe Maria Carpaneto

    2017-08-01

    Full Text Available The Life ProjectMonitoring of insects with public participation” (LIFE11 NAT/IT/000252 had as the main objective to develop and test methods for the monitoring of five beetle species listed in the Annexes of the Habitats Directive (92/43/EEC: Osmoderma eremita (hermit beetle, Scarabaeidae, Lucanus cervus (European stag beetle, Lucanidae, Cerambyx cerdo (great capricorn beetle, Cerambycidae, Rosalia alpina (rosalia longicorn, Cerambycidae and Morimus asper/funereus (morimus longicorn, Cerambycidae. The data gathered represent an important contribution to the monitoring of these target species in Italy. The methods developed for monitoring of the target species are intended for use by the local management authorities and staff of protected areas. These developed methods are the result of extensive fieldwork and ensure scientific validity, ease of execution and limited labour costs. The detailed description of methods and the results for each species are published in separate articles of this special issue of Nature Conservation. A second objective of the project was to gather faunistic data with a Citizen Science approach, using the web and a mobile application software (app specifically built for mobile devices. The validation of the records collected by the citizens was carried out by experts, based on photographs, which were obligatory for all records. Dissemination activities represented the principal way to contact and engage citizens for the data collection and also offered the possibility of providing information on topics such as Natura 2000, the Habitats Directive, the role of monitoring in nature conservation, the importance of forest ecosystems and the ecological role of the saproxylic insects. An innovative method tested during the project was the training of a dog for searching and monitoring the elusive hermit beetle; the trained dog also added a “curiosity” factor to attract public attention towards this rare insect and

  19. Next Generation Nuclear Plant Project Technology Development Roadmaps: The Technical Path Forward for 750–800°C Reactor Outlet Temperature

    Energy Technology Data Exchange (ETDEWEB)

    John Collins

    2009-08-01

    This document presents the NGNP Critical PASSCs and defines their technical maturation path through Technology Development Roadmaps (TDRMs) and their associated Technology Readiness Levels (TRLs). As the critical PASSCs advance through increasing levels of technical maturity, project risk is reduced and the likelihood of within-budget and on-schedule completion is enhanced. The current supplier-generated TRLs and TDRMs for a 750–800°C reactor outlet temperature (ROT) specific to each supplier are collected in Appendix A.

  20. Research on horizontal displacement monitoring method of deep foundation pit based on laser projecting sensing technology

    Science.gov (United States)

    Liu, Peng; Xie, Shulin; Zhang, Lixiao; Zhou, Guangyi; Zhao, Xuefeng

    2018-03-01

    A certain level of horizontal displacement will occur during excavation or subsequent construction of deep foundation pit. If the support is improper and the horizontal displacement of the foundation pit is too large, it will cause collapse and even affect the buildings around the foundation pit, which will endanger people's life and property. Therefore, the horizontal displacement monitoring of deep foundation pit becomes more and more important. At present, the electronic total station is often used to monitor the horizontal displacement of the foundation pit, but this monitoring method is expensive, prone to accidental errors, and can not be used for real-time monitoring. Therefore, a method of monitoring the horizontal displacement of deep foundation pit by using laser projection sensing technique is proposed in this paper. The horizontal displacement of the foundation pit is replaced by the displacement of the laser spot emitted by the laser, and the horizontal displacement of the foundation pit can be obtained by identifying the displacement of the laser spot projected on the screen. A series of experiments show that the accuracy of this monitoring method meets the engineering requirements and greatly reduces the cost, which provides a new technology for the displacement monitoring of deep foundation pit.

  1. Geothermal direct-heat utilization assistance. Quarterly project progress report, July 1996--September 1996. Federal Assistance Program

    Energy Technology Data Exchange (ETDEWEB)

    Lienau, P.

    1996-11-01

    This report summarizes geothermal technical assistance, R&D and technology transfer activities of the Geo-Heat Center at Oregon Institute of Technology for the fourth quarter of FY-96. It describes 152 contacts with parties during this period related to technical assistance with geothermal direct heat projects. Areas dealt with include geothermal heat pumps, space heating, greenhouses, aquaculture, equipment, economics and resources. Research activities are summarized on greenhouse peaking. Outreach activities include the publication of a geothermal direct use Bulletin, dissemination of information, geothermal library, technical papers and seminars, and progress monitor reports on geothermal resources and utilization.

  2. Project on 'contaminations - radiation - ecosystems - health' in Russia

    International Nuclear Information System (INIS)

    Botov, N.G.; Kozulin, S.P.; Mironova, N.I.; Dubov, R.I.

    1993-01-01

    This project has two purposes: 1. To determine the influence of the radiation factor among other factors that are increasing human disease and death rate, and are determining industrial impacts to the environment, ecosystems, and people's lives; 2. To ascertain the ecological, medical and social wellbeing of certain contaminated areas in Russia, monitoring and management of radioactive pollution, radioactive waste storage, heavy metals and other contaminants. In our report we present the following: a few experimental data on radioactive contamination; problems of information, experiments and metrology; scientific and technical methods and approaches; financial, equipmental and other needs, that are necessary for successful completion of this Project

  3. Technical safety appraisal of the West Valley Demonstration Project

    International Nuclear Information System (INIS)

    1989-09-01

    This report presents the results of one in a series of Technical Safety Appraisals (TSAs) being conducted of DOE nuclear operations by the Assistant Secretary for Environment, Safety, and Health Office of Safety Appraisals TSAs are one of the ititiatives announced by the Secretary of Energy on September 18, 1985, to enhance the DOE environment, safety and health program. This report presents the results of a TSA of the West Valley Demonstration Project (WVDP). The appraisal was conducted by a team of exerts assembled by the DOE Office of Safety Appraisal and was conducted during onsite visits of June 26-30 and July 10-21, 1989. West Valley, about 30 miles south of Buffalo, New York is the location of the only commercial nuclear fuel reprocessing facility operated in the United States. Nuclear Fuels Services, Inc. (NFS) operated the plant from 1966 to 1972 and processed about 640 metric tons of spent reactor fuel. The reprocessing operation generated about 560,000 gallons of high-level radioactive waste, which was transferred into underground tanks for storage. In 1972 NFS closed the plant and subsequently decided not to reopen it

  4. Guide on Project Web Access of SFR R and D and Technology Monitoring System

    International Nuclear Information System (INIS)

    Lee, Dong Uk; Won, Byung Chool; Lee, Yong Bum; Kim, Young In; Hahn, Do Hee

    2008-09-01

    The SFR R and D and technology monitoring system based on the MS enterprise project management is developed for systematic effective management of 'Development of Basic Key Technologies for Gen IV SFR' project which was performed under the Mid- and Long-term Nuclear R and D Program sponsored by the Ministry of Education, Science and Technology. This system is a tool for project management based on web access. Therefore this manual is a detailed guide for Project Web Access(PWA). Section 1 describes the common guide for using of system functions such as project server 2007 client connection setting, additional outlook function setting etc. The section 2 describes the guide for system administrator. It is described the guide for project management in section 3, 4

  5. Guide on Project Web Access of SFR R and D and Technology Monitoring System

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Dong Uk; Won, Byung Chool; Lee, Yong Bum; Kim, Young In; Hahn, Do Hee

    2008-09-15

    The SFR R and D and technology monitoring system based on the MS enterprise project management is developed for systematic effective management of 'Development of Basic Key Technologies for Gen IV SFR' project which was performed under the Mid- and Long-term Nuclear R and D Program sponsored by the Ministry of Education, Science and Technology. This system is a tool for project management based on web access. Therefore this manual is a detailed guide for Project Web Access(PWA). Section 1 describes the common guide for using of system functions such as project server 2007 client connection setting, additional outlook function setting etc. The section 2 describes the guide for system administrator. It is described the guide for project management in section 3, 4.

  6. High altitude environmental monitoring: the SHARE project and CEOP-HE

    Science.gov (United States)

    Tartari, G.

    2009-04-01

    Mountain areas above 2,500 m a.s.l. constitute about 25% of the Earth's surface and play a fundamental role in the global water balance, while influencing global climate and atmospheric circulation systems. Several millions, including lowlanders, are directly affected by the impacts of climate change on glaciers and water resource distribution. Mountains and high altitude plateaus are subject to the highest rate of temperature increase (e.g., Tibetan Plateau) and are recognized as particularly vulnerable to the effects of climate change. In spite of this, the number of permanent monitoring sites in the major environmental networks decreases with altitude. On a sample of two hundred high altitude automatic weather stations located above 2,500 m a.s.l., less than 20% are over 4,000 m, while there are only 24 stations in the world that could be considered "complete" high altitude observatories. Furthermore, entire mountain areas are left uncovered, creating significant data gaps which make reliable modelling and forecasting nearly impossible. In response to these problems, Ev-K2-CNR has developed the project SHARE (Stations at High Altitude for Research on the Environment) with the support of the Italian government and in collaboration with UNEP. This integrated environmental monitoring and research project aims to improve knowledge on the local, regional and global consequences of climate change in mountain regions and on the influence of high elevations on climate, atmospheric circulation and hydrology. SHARE today boasts a network of 13 permanent monitoring stations between 2,165 m and 8,000 m. Affiliated researchers have produced over 150 scientific publications in atmospheric sciences, meteorology and climate, glaciology, limnology and paleolimnology and geophysics. SHARE network data is also contributed to international programs (UNEP-ABC, WMO-GAW, WCRP-GEWEX-CEOP, NASA-AERONET, ILTER, EU-EUSAAR, EU-ACCENT). Within this context, the CEOP-High Elevations (CEOP

  7. Assessment of knowledge and skills about growth monitoring amongst multipurpose workers in an ICDS project.

    Science.gov (United States)

    Kapil, U; Sood, A K; Gaur, D R; Bhasin, S

    1991-08-01

    Knowledge and skills amongst 34 multipurpose workers working in an ICDS project about growth monitoring was assessed using interview technique. All workers had correct knowledge about rationale of growth monitoring. A total of 73.5% and 94.1% had knowledge that flattened growth curve indicates no weight gain and descending growth indicates decrease in weight, respectively.

  8. Advanced Flue Gas Desulfurization (AFGD) demonstration project: Volume 2, Project performance and economics. Final technical report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-04-30

    The project objective is to demonstrate removal of 90--95% or more of the SO{sub 2} at approximately one-half the cost of conventional scrubbing technology; and to demonstrate significant reduction of space requirements. In this project, Pure Air has built a single SO{sub 2} absorber for a 528-MWe power plant. The absorber performs three functions in a single vessel: prequencher, absorber, and oxidation of sludge to gypsum. Additionally, the absorber is of a co- current design, in which the flue gas and scrubbing slurry move in the same direction and at a relatively high velocity compared to conventional scrubbers. These features all combine to yield a state- of-the-art SO{sub 2} absorber that is more compact and less expensive than conventional scrubbers. The project incorporated a number of technical features including the injection of pulverized limestone directly into the absorber, a device called an air rotary sparger located within the base of the absorber, and a novel wastewater evaporation system. The air rotary sparger combines the functions of agitation and air distribution into one piece of equipment to facilitate the oxidation of calcium sulfite to gypsum. Additionally, wastewater treatment is being demonstrated to minimize water disposal problems inherent in many high-chloride coals. Bituminous coals primarily from the Indiana, Illinois coal basin containing 2--4.5% sulfur were tested during the demonstration. The Advanced Flue Gas Desulfurization (AFGD) process has demonstrated removal of 95% or more of the SO{sub 2} while providing a commercial gypsum by-product in lieu of solid waste. A portion of the commercial gypsum is being agglomerated into a product known as PowerChip{reg_sign} gypsum which exhibits improved physical properties, easier flowability and more user friendly handling characteristics to enhance its transportation and marketability to gypsum end-users.

  9. Ontario Hydro's environmental monitoring program for HV [high voltage] transmission line projects

    International Nuclear Information System (INIS)

    Braekevelt, P.N.

    1991-01-01

    Responsible monitoring and control of environmental impacts is key to obtaining future needed approvals for new high voltage (HV) transmission line projects. Ontario Hydro's environmental monitoring program was developed as a highly structured, self-imposed monitoring system to relieve government agencies of the responsibility of developing a similar external program. The goal was to be self-policing. The historical development, program structure, standards, priority ratings, documentation, communication and computerization of the program is described. The most effective way to minimize environmental impacts is to avoid sensitive features at the route selection stage, well before any construction takes place. The environmental monitoring program is based on the following blueprint: each crew member is responsible for environmental protection; environmental problems are to be resolved at the lowest level possible; potential concerns should be resolved before they become problems; known problems should be dealt with quickly to minimize impacts; team members should work cooperatively; and formal and regular communication is emphasized

  10. Testing of portal monitors for personnel contamination control

    International Nuclear Information System (INIS)

    Johnson, L.O.; Gupta, V.P.; Stevenson, R.L.; Stalker, A.C.; Baker, K.R.; Littleton, M.L.; Rich, B.L.

    1983-04-01

    This is a report of an INPO-funded evaluation of state-of-the-art portal monitors used to detect personnel contamination. The project developed techniques and procedures to evaluate the performance and sensitivity of the portal monitors which provided data for intercomparison. An additional accomplishment was development of a methodology to assist manufacturers and users to optimize the monitor settings, and to provide technical basis for the eventual use of fixed monitors to replace frisking for contamination control. The monitors tested utilize thin-window gas-flow proportional counters sensitive to beta and gamma radiation. Various tests were performed: (1) background count rate and the statistical variability, (2) detector efficiency at different distances, (3) moving source sensitivity for various size sources and speeds, and (4) false alarm rates at different background levels. A model has been developed for the moving source measurements to compare the experimental data, and to test whether it is possible to adequately model the behavior of a portal monitor response to a moving source. The model results with the actual test results are compared

  11. Project SIMORAC: a wireless system for radiation monitoring in emergencies

    International Nuclear Information System (INIS)

    Gomez, D.; Serrano, J. L.; Cabrera, E.; Barbaran, J.; Llopis, L.; Diaz, M.

    2013-01-01

    The SIMORAC project includes a new system for Radiological monitoring using wireless sensor networks (RSIs), without infrastructure planning in emergency situations for a rapidly deployable by air or land, with the aim of providing a tool emergency teams capable of offering a real time x-ray map within the radius of action of an accident. Communication of quality at a great distance, resistance to weather, long autonomy and possibility of aerial deployment are some of the features of SIMORAC.

  12. Fish Research Project Oregon; Umatilla Hatchery Monitoring and Evaluation, 1992 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Keefe, MaryLouise; Carmichael, Richard W.; French, Rod A. (Oregon Department of Fish and Wildlife, Portland, OR)

    1993-03-01

    This report covers the first year of comprehensive monitoring and evaluation of the Umatilla Hatchery. As both the hatchery and the evaluation study are in the early stages of implementation, much of the information contained in this report is preliminary. The most crucial data for evaluating the success of the hatchery program, the data on post-release performance and survival, is yet unavailable. In addition, several years of data are necessary to make conclusions about rearing performance at Umatilla Hatchery. The conclusions drawn in this report should be viewed as preliminary and should be used in conjunction with additional information as it becomes available. A comprehensive fish health monitoring regimen was incorporated into the monitoring and evaluation study for Umatilla Hatchery. This is a unique feature of the Umatilla Hatchery evaluation project.

  13. Technical snow production in skiing areas: conditions, practice, monitoring and modelling. A case study in Mayrhofen/Austria

    Science.gov (United States)

    Strasser, Ulrich; Hanzer, Florian; Marke, Thomas; Rothleitner, Michael

    2017-04-01

    The production of technical snow today is a self-evident feature of modern alpine skiing resort management. Millions of Euros are invested every year for the technical infrastructure and its operation to produce a homogeneous and continuing snow cover on the skiing slopes for the winter season in almost every larger destination in the Alps. In Austria, skiing tourism is a significant factor of the national economic structure. We present the framing conditions of technical snow production in the mid-size skiing resort of Mayrhofen (Zillertal Alps/Austria, 136 km slopes, elevation range 630 - 2.500 m a.s.l.). Production conditions are defined by the availability of water, the planned date for the season opening, and the climatic conditions in the weeks before. By means of an adapted snow production strategy an attempt is made to ecologically and economically optimize the use of water and energy resources. Monitoring of the snow cover is supported by a network of low-cost sensors and mobile snow depth recordings. Finally, technical snow production is simulated with the spatially distributed, physically based hydroclimatological model AMUNDSEN. The model explicitly considers individual snow guns and distributes the produced snow along the slopes. The amount of simulated snow produced by each device is a function of its type, of actual wet-bulb temperature at the location, of ski area infrastructure (in terms of water supply and pumping capacity), and of snow demand.

  14. BX in situ oil shale project. Annual technical progress report, March 1, 1979-February 29, 1980 and quarterly technical progress report, December 1, 1979-February 29, 1980

    Energy Technology Data Exchange (ETDEWEB)

    Dougan, P.M.

    1980-03-20

    During the year, design, construction and installation of all project equipment was completed, and continuous steam injection began on September 18, 1979 and continued until February 29, 1980. In the five-month period of steam injection, 235,060 barrels of water as steam at an average wellhead pressure of 1199 psig and an average wellhead temperature of 456/sup 0/F were injected into the eight project injection wells. Operation of the project at design temperature and pressure (1000/sup 0/F and 1500 psig) was not possible due to continuing problems with surface equipment. Environmental monitoring at the project site continued during startup and operation.

  15. Integrating Modeling and Monitoring to Provide Long-Term Control of Contaminants

    International Nuclear Information System (INIS)

    Fogwell, Th.

    2009-01-01

    An introduction is presented of the types of problems that exist for long-term control of radionuclides at DOE sites. A breakdown of the distributions at specific sites is given, together with the associated difficulties. A paradigm for remediation showing the integration of monitoring with modeling is presented. It is based on a feedback system that allows for the monitoring to act as principal sensors in a control system. Currently the establishment of a very prescriptive monitoring program fails to have a mechanism for improving models and improving control of the contaminants. The resulting system can be optimized to improve performance. Optimizing monitoring automatically entails linking the monitoring with modeling. If monitoring designs were required to be more efficient, thus requiring optimization, then the monitoring automatically becomes linked to modeling. Records of decision could be written to accommodate revisions in monitoring as better modeling evolves. The technical pieces of the required paradigm are already available; they just need to be implemented and applied to solve the long-term control of the contaminants. An integration of the various parts of the system is presented. Each part is described, and examples are given. References are given to other projects which bring together similar elements in systems for the control of contaminants. Trends are given for the development of the technical features of a robust system. Examples of monitoring methods for specific sites are given. The examples are used to illustrate how such a system would work. Examples of technology needs are presented. Finally, other examples of integrated modeling-monitoring approaches are presented. (authors)

  16. EC MoDeRn Project: In-situ Demonstration of Innovative Monitoring Technologies for Geological Disposal - 12053

    Energy Technology Data Exchange (ETDEWEB)

    Breen, B.J. [NDA, Herdus House, Westlakes Science and Technology Park, Moor Row, Cumbria, CA24 3HU (United Kingdom); Garcia-Sineriz, J.L. [AITEMIN, c/Margarita Salas 14-Parque Leganes Tecnologico-Leganes, ES-28918, Madrid (Spain); Maurer, H. [ETH Zurich, ETH Honggerberg, CH-8093, Zurich (Switzerland); Mayer, S. [ANDRA, 1-7 rue Jean-Monnet, F-92298 Chatenay-Malabry cedex (France); Schroeder, T.J. [NRG, P.O. Box 25, NL-1755 ZG Petten (Netherlands); Verstricht, J. [EURIDICE EIG, c/o SCK.CEN, Boeretang 200, BE-2400 Mol (Belgium)

    2012-07-01

    Monitoring to provide information on the evolution of geological disposal presents several challenges. The 4-year, euros M 5, EC MoDeRn Project (http://www.modern-fp7.eu/), which commenced in 2009, addresses monitoring processes, state-of-the-art technology and innovative research and development of monitoring techniques. This paper discusses some of the key drivers for the development of innovative monitoring techniques and provides outlines of the demonstration programmes being conducted within MoDeRn. The aim is to develop these innovative monitoring techniques and to demonstrate them under realistic conditions present in underground laboratories. These demonstration projects, applying a range of different monitoring techniques, are being carried out at underground research facilities in different geological environments at HADES URL in Belgium (plastic clay), Bure in France (indurated clay) and at Grimsel Test Site (granite) in Switzerland. These are either built upon existing infrastructure (EC ESDRED Low pH shotcrete and TEM experiments at Grimsel; and PRACLAY experiment and underground galleries in HADES) or will be attached to infrastructure that is being developed and financed by resources outside of this project (mock-up disposal cell in Bure). At Grimsel Test Site, cross-hole and hole-to-tunnel seismic methods are being employed as a means to monitor induced changes in an artificially saturated bentonite wall confined behind a shotcrete plug. Recognising the limitations for travel-time tomography for monitoring a disposal cell, full waveform inversion techniques are being employed to enhance the capacity to monitor remote from the excavation. At the same Grimsel location, an investigation will be conducted of the potential for using a high frequency wireless (HFW) sensor network embedded within the barrier system; this will include the possibility of providing energy remotely to isolated sensors. At the HADES URL, the monitoring programme will utilise

  17. Successful PV SHS project in developing countries? barriers and way foreword

    International Nuclear Information System (INIS)

    Villers, T. de; Watchueng, S.; Shanker, A.; Rambaud-Measson, D.

    2004-01-01

    The implementation of a solar home system (SHS) programme in developing countries is complex and its success is dependant on many factors that are usually difficult to handle. The objective of this paper is to address financial and organisational aspects barriers and measures to PV programme implementation drawn from two specific projects in West Africa. Technical aspects on quality control and monitoring are also discussed. (authors)

  18. Status of Radon Related Activities in Member States Participating in Technical Cooperation Projects in Europe

    International Nuclear Information System (INIS)

    2017-03-01

    This publication summarizes the status of radon programmes at the start of 2014 in the Member States in Europe participating in the IAEA technical cooperation project on establishing enhanced approaches to the control of public exposure to radon. The current status was determined from responses to a questionnaire covering the following elements of a national radon action plan: policies and strategies; radon measurement surveys; establishment of reference levels; managing radon in existing buildings and in future buildings; education and training of professionals; and public awareness initiatives.

  19. Quality and Safety of Home ICP Monitoring Compared with In-Hospital Monitoring

    DEFF Research Database (Denmark)

    Andresen, Morten; Juhler, Marianne; Munch, Tina Nørgaard

    2012-01-01

    Introduction: Intracranial pressure (ICP) monitoring is usually conducted in-hospital using stationary devices. Modern mobile ICP monitoring systems present new monitoring possibilities more closely following the patients' daily life. We reviewed patient safety, quality of technical data...

  20. Report of the first meeting of the Project Advisory Committee (Technical) 21-24 March 1983, at NEMROCK, Cairo

    International Nuclear Information System (INIS)

    Taylor, C.B.G.

    1983-05-01

    The Project Advisory Committee (Technical) (PACT) met on 21-24 March 1983, at NEMROCK, Cairo, Egypt, to discuss the joint IAEA/WHO project on Intracavitary Radiation Therapy for Cancer of the Uterus (Egypt/6/004). At this four day meeting the committee (1) identified a well-defined administrative framework in which earlier diagnosis of uterine cancer may be organized, on a limited but firm basis. (2) Agreed on the clinical and dosimetric principles to be followed in implementing the project. (3) Decided on the types and quantities of equipment which it will need in its first two years. (4) Developed the outline of the syllabus for the first training course, and fixed its date (three weeks from 83-10-29). (5) Reviewed the costs which will be incurred in carrying through the project and found them to be consistent with the funds available

  1. The Satellite based Monitoring Initiative for Regional Air quality (SAMIRA): Project summary and first results

    Science.gov (United States)

    Schneider, Philipp; Stebel, Kerstin; Ajtai, Nicolae; Diamandi, Andrei; Horalek, Jan; Nemuc, Anca; Stachlewska, Iwona; Zehner, Claus

    2017-04-01

    We present a summary and some first results of a new ESA-funded project entitled Satellite based Monitoring Initiative for Regional Air quality (SAMIRA), which aims at improving regional and local air quality monitoring through synergetic use of data from present and upcoming satellite instruments, traditionally used in situ air quality monitoring networks and output from chemical transport models. Through collaborative efforts in four countries, namely Romania, Poland, the Czech Republic and Norway, all with existing air quality problems, SAMIRA intends to support the involved institutions and associated users in their national monitoring and reporting mandates as well as to generate novel research in this area. The primary goal of SAMIRA is to demonstrate the usefulness of existing and future satellite products of air quality for improving monitoring and mapping of air pollution at the regional scale. A total of six core activities are being carried out in order to achieve this goal: Firstly, the project is developing and optimizing algorithms for the retrieval of hourly aerosol optical depth (AOD) maps from the Spinning Enhanced Visible and InfraRed Imager (SEVIRI) onboard of Meteosat Second Generation. As a second activity, SAMIRA aims to derive particulate matter (PM2.5) estimates from AOD data by developing robust algorithms for AOD-to-PM conversion with the support from model- and Lidar data. In a third activity, we evaluate the added value of satellite products of atmospheric composition for operational European-scale air quality mapping using geostatistics and auxiliary datasets. The additional benefit of satellite-based monitoring over existing monitoring techniques (in situ, models) is tested by combining these datasets using geostatistical methods and demonstrated for nitrogen dioxide (NO2), sulphur dioxide (SO2), and aerosol optical depth/particulate matter. As a fourth activity, the project is developing novel algorithms for downscaling coarse

  2. Fundamentals for remote structural health monitoring of wind turbine blades - a pre-project

    Energy Technology Data Exchange (ETDEWEB)

    Soerensen, B.F.; Lading, L.; Sendrup, P. (and others)

    2002-05-01

    This summary-report describes the results of a pre-project that has the aim of establishing the basic technical knowledge to evaluate whether remote surveillance of the rotor blades of large off-shore wind turbines has technical and economical potential. A cost-benefit analysis was developed, showing that it is economically attractive to use sensors embedded in the blade. Specific technical requirements were defined for the sensors capability to detect the most important damage types in wind turbine blades. Three different sensor types were selected for use in laboratory experiments and full-scale tests of a wind turbine blade developing damage: 1) detection of stress wave emission by acoustic emission, 2) measurement of modal shape changes by accelerometers and 3) measurement of crack opening of adhesive joint by a fibre optics micro-bend displacement transducer that was developed in the project. All types of sensor approaches were found to work satisfactory. The techniques were found to complement each other: Acoustic emission has the capability of detecting very small damages and can be used for locating the spatial position and size of evolving damages. The fibre optics displacement transducer was found to work well for detecting adhesive failure. Modelling work shows that damage in a wind turbine blade causes a significant change in the modal shape when the damage is in the order of 0.5-1 m. Rough estimates of the prices of complete sensor systems were made. The system based on acoustic emission was the most expensive and the one based on accelerometers was the cheapest. NDT methods (ultrasound scanning and X-ray inspection) were found to be useful for verification of hidden damage. Details of the work are described in annexes. (au)

  3. Condition Monitoring and Management from Acoustic Emissions

    DEFF Research Database (Denmark)

    Pontoppidan, Niels Henrik Bohl

    2005-01-01

    In the following, I will use technical terms without explanation as it gives the freedom to describe the project in a shorter form for those who already know. The thesis is about condition monitoring of large diesel engines from acoustic emission signals. The experiments have been focused...... is the analysis of the angular position changes of the engine related events such as fuel injection and valve openings, caused by operational load changes. With inspiration from speech recognition and voice effects the angular timing changes have been inverted with the event alignment framework. With the event...

  4. Agency for Nuclear Projects/Nuclear Waste Project Office final progress report

    International Nuclear Information System (INIS)

    1992-01-01

    The Nevada Agency for Nuclear Projects/Nuclear Waste Project Office (NWPO) was formally established by Executive Policy in 1983 following passage of the federal Nuclear Waste Policy Act of 1982 (Act). That Act provides for the systematic siting, construction, operation, and closure of high-level radioactive defense and research by-products and other forms of high-level radioactive waste from around the country which will be stored at such repositories. In 1985 the Nevada legislature formally established the NWPO as a distinct and statutorily authorized agency to provide support to the Governor and State Legislature on matters concerning the high-level nuclear waste programs. The NWPO utilized a small, central staff supplemented by contractual services for needed technical and specialized expertise in order to provide high quality oversight and monitoring of federal activities, to conduct necessary independent studies, and to avoid unnecessary duplication of efforts. This report summarizes the results of this ongoing program to ensure that risks to the environment and to human safety are minimized. It includes findings in the areas of hydrogeology, geology, quality assurance activities, repository engineering, legislature participation, socioeconomic affects, risk assessments, monitoring programs, public information dissemination, and transportation activities. The bulk of the reporting deals with the Yucca Mountain facility

  5. Monitoring geomechanické stability důlních prostor, léta 2001 – 2011

    Czech Academy of Sciences Publication Activity Database

    Kukutsch, Radovan; Žůrek, P.; Kořínek, R.; Daněk, T.; Hudeček, V.; Grmela, A.

    2011-01-01

    Roč. 18, č. 1 (2011), s. 31-39 ISSN 1803-1447 R&D Projects: GA ČR GA105/09/0089 Institutional research plan: CEZ:AV0Z30860518 Keywords : Jeroným Mine in Čistá * geomechanical monitoring * technical seismicity Subject RIV: DC - Siesmology, Volcanology, Earth Structure www.caag.cz

  6. Methodology for construction compliance monitoring in the crediting of investment projects for road construction

    Science.gov (United States)

    Vaynshtok, Natalia

    2017-10-01

    The article provides the results of development of the methodology for construction compliance monitoring in the crediting of investment projects for road construction. Work scope analysis of construction audit was conducted and an algorithm of financial audit in the crediting investment projects was developed. Furthermore, the possible pitfalls and abuses of counterparties were investigated and recommendations were given allowing the bank to receive objective and independent information on the progress of the project in real time. This mechanism is useful for the bank in insurance of possible risks, targeted and rational use of credit funds.

  7. Manitoba Hydro long-term high-voltage transmission line magnetic field monitoring project

    International Nuclear Information System (INIS)

    Wong, P.S.; Ng, C.K.

    2008-01-01

    As part of the licensing process to construct a new 230 kV transmission line on an existing right-of-way in Manitoba, an electrical effects study was conducted in 1998. The study was part of the environmental assessment program crucial in obtaining government approval to construct the line. Some residents living adjacent to the new transmission circuit expressed concerns about alleged adverse health effects associated with long-term exposure to magnetic fields from high voltage transmission lines. In order to verify the accuracy of the predicted magnetic field levels submitted to the regulatory body in the the electrical effects study and to instill confidence in the residents of the affected communities, a three-year magnetic monitoring project was conducted between 2003 and 2005 along the right-of-way after the new 230kV transmission line was energized by Manitoba Hydro. This paper described the monitoring program, with reference to location; equipment; data analysis; and discussion of results. It was concluded that the long-term monitoring project demonstrated that the magnetic field prediction methodology was well understood and accurate, and provided valuable long-term magnetic field characteristics at the edge of the right-of-way. In addition, when there is opposition to a transmission line, public consultation and education were found to be the best options to arrive at a solution. 3 refs., 1 tab., 12 figs

  8. Project GRETE: evaluation of non destructive testing techniques for monitoring of material degradation

    International Nuclear Information System (INIS)

    Coste, J.F.

    2001-01-01

    The material aging of major critical components of nuclear installations due to in-service conditions may lead to a degradation of their mechanical characteristics. The early detection of material changes and their monitoring using innovative non destructive testing techniques would allow to plan actions in order to prevent the apparition of macroscopic damage (e.g. cracks). One major difficulty in using these particular techniques is to correlate the changes in the measured NDT signals to the microstructural changes in the material due to aging. This problem may be solved through careful microstructural examinations of the material damage. The objective of the project GRETE is to illustrate the potential use of NDT techniques for the monitoring of material degradation through two examples: neutron irradiation of reactor pressure vessel steel and thermal fatigue of piping. The purpose of this paper is to present the project and its programme of work. (author)

  9. Geophysical monitoring of active hydrologic processes as part of the Dynamic Underground Stripping Project

    International Nuclear Information System (INIS)

    Newmark, R.L.

    1992-05-01

    Lawrence Livermore National Laboratory, in collaboration with University of California at Berkeley and Lawrence Berkeley Laboratory, is conducting the Dynamic Underground Stripping Project (DUSP), an integrated project demonstrating the use of active thermal techniques to remove subsurface organic contamination. Complementary techniques address a number of environmental restoration problems: (1) steam flood strips organic contaminants from permeable zones, (2) electrical heating drives contaminants from less permeable zones into the more permeable zones from which they can be extracted, and (3) geophysical monitoring tracks and images the progress of the thermal fronts, providing feedback and control of the active processes. The first DUSP phase involved combined steam injection and vapor extraction in a ''clean'' site in the Livermore Valley consisting of unconsolidated alluvial interbeds of clays, sands and gravels. Steam passed rapidly through a high-permeability gravel unit, where in situ temperatures reached 117 degree C. An integrated program of geophysical monitoring was carried out at the Clean Site. We performed electrical resistance tomography (ERT), seismic tomography (crossborehole), induction tomography, passive seismic monitoring, a variety of different temperature measurement techniques and conventional geophysical well logging

  10. Household environmental monitoring project, volume I : main report, volume 2 : appendices

    Energy Technology Data Exchange (ETDEWEB)

    Thompson, J.; Goemans, M.; Goemans, P.C.; Wisniowski, A. [Jane Thompson Architect, Ottawa, ON (Canada); Fugler, D. [Canada Mortgage and Housing Corp., Ottawa, ON (Canada)

    2006-01-15

    Environmentally sustainable behaviour can be motivated by providing homeowners with a clear picture of their environmental impact, tangible reasons for improvement, and tailored solutions. This report presented the results of a study that established a study group of 20 households in an 85-year old community near downtown Ottawa, Ontario to test the above hypothesis. Each household completed surveys about environmental attitudes and household practices. Each household also tracked home heating, electricity and water consumption, and vehicle usage and waste generation over a monitoring period of one week. This report described the study in detail and presented the research plan and methods. It provided a review of related literature, including motivational techniques for encouraging sustainable behaviour; environmental monitoring tools including design tools, global impact assessment tools, federal environmental reduction tools and strategies; analyses of environmentally sustainable projects; and resource conservation techniques and manuals. The report also discussed the selection of the study group; development of monitoring method and forms; household monitoring; household assessment and reporting; community initiatives; and assessment of following year results. It was concluded that the research technique successfully produced reductions in environmental impact among the study group. refs., tabs., figs.

  11. STRATEGY AND PLANNING - PROJECT FOR MONITORING STRICTO SENSU POSTGRADUATE ALUMNI

    Directory of Open Access Journals (Sweden)

    Emerson Antonio Maccari

    2014-07-01

    Full Text Available The Coordination of Improvement of Higher Education Personnel (CAPES has been contributing to the development of post-graduate studies in Brazil, through its system of evaluation. Lately, CAPES signaled the importance of follow the professional performance of the alumni as a way to measure the quality of courses. One difficulty reported by institutions that intend to recognize the trajectory of its graduates is to compile a lot of isolated and outdated data. In order to structure the data collection and to assist educational managers in decision making, we propose the development of a system that enables the evolution of the students and alumni professional career, in order to diagnose the influence of the courses. Based on literature review, this study presents an analysis and makes recommendations about the Monitoring Alumni Project planning. As a result, it is expected that the analysis will serve as a driver for conducting the project, aiming to contribute to the academic reflections, and in practice, contribute to improve educational projects quality.

  12. Information collection regarding geoscientific monitoring techniques during closure of underground facility in crystalline rock

    International Nuclear Information System (INIS)

    Hosoya, Shinichi; Yamashita, Tadashi; Iwatsuki, Teruki; Saegusa, Hiromitsu; Onoe, Hironori; Ishibashi, Masayuki

    2016-01-01

    The Mizunami Underground Research Laboratory (MIU) project is being pursued by the Japan Atomic Energy Agency (JAEA) to enhance the reliability of geological disposal technologies through investigations of the deep geological environment in the crystalline host rock (granite) at Mizunami City in Gifu Prefecture, central Japan. On the occasion of the reform of the entire JAEA organization in 2014, JAEA identified the critical issues on the geoscientific research program: “Development of modelling technologies for mass transport”, “Development of drift backfilling technologies” and “Development of technologies for reducing groundwater inflow”, based on the latest results of the synthesizing R and D. The purposes of the “Development of drift backfilling technologies” are to develop closure methodology and technology, and long-term monitoring technology, and to evaluate resilience of geological environment. In order to achieve the purposes, previous information from the case example of underground facility constructed in crystalline rock in Europe has been collected in this study. In particular, the boundary conditions for the closure, geological characteristics, technical specifications, and method of monitoring have been focused. The information on the international project regarding drift closure test and development of monitoring technologies has also been collected. In addition, interviews were conducted to Finnish and Swedish specialists who have experiences involving planning, construction management, monitoring, and safety assessment for the closure to obtain the technical knowledge. Based on the collected information, concept and point of attention, which are regarding drift closure testing, and planning, execution management and monitoring on the closure of MIU, have been specified. (author)

  13. Summary of field operations Technical Area I well PGS-1. Site-Wide Hydrogeologic Characterization Project

    International Nuclear Information System (INIS)

    Fritts, J.E.; McCord, J.P.

    1995-02-01

    The Environmental Restoration (ER) Project at Sandia National Laboratories, New Mexico is managing the project to assess and, when necessary, to remediate sites contaminated by the lab operations. Within the ER project, the site-wide hydrogeologic characterization task is responsible for the area-wide hydrogeologic investigation. The purpose of this task is to reduce the uncertainty about the rate and direction of groundwater flow beneath the area and across its boundaries. This specific report deals with the installation of PGS-1 monitoring well which provides information on the lithology and hydrology of the aquifer in the northern area of the Kirtland Air Force Base. The report provides information on the well design; surface geology; stratigraphy; structure; drilling, completion, and development techniques; and borehole geophysics information

  14. Technical needs and research opportunities provided by projected aeronautical and space systems

    Science.gov (United States)

    Noor, Ahmed K.

    1992-01-01

    The overall goal of the present task is to identify the enabling and supporting technologies for projected aeronautical and space systems. A detailed examination was made of the technical needs in the structures, dynamics and materials areas required for the realization of these systems. Also, the level of integration required with other disciplines was identified. The aeronautical systems considered cover the broad spectrum of rotorcraft; subsonic, supersonic and hypersonic aircraft; extremely high-altitude aircraft; and transatmospheric vehicles. The space systems considered include space transportation systems; spacecrafts for near-earth observation; spacecrafts for planetary and solar exploration; and large space systems. A monograph is being compiled which summarizes the results of this study. The different chapters of the monograph are being written by leading experts from governmental laboratories, industry and universities.

  15. Southwest Project: resource/institutional requirements analysis. Volume II. Technical studies

    Energy Technology Data Exchange (ETDEWEB)

    Ormsby, L. S.; Sawyer, T. G.; Brown, Dr., M. L.; Daviet, II, L. L.; Weber, E. R.; Brown, J. E.; Arlidge, J. W.; Novak, H. R.; Sanesi, Norman; Klaiman, H. C.; Spangenberg, Jr., D. T.; Groves, D. J.; Maddox, J. D.; Hayslip, R. M.; Ijams, G.; Lacy, R. G.; Montgomery, J.; Carito, J. A.; Ballance, J. W.; Bluemle, C. F.; Smith, D. N.; Wehrey, M. C.; Ladd, K. L.; Evans, Dr., S. K.; Guild, D. H.; Brodfeld, B.; Cleveland, J. A.; Hicks, K. L.; Noga, M. W.; Ross, A. M.

    1979-12-01

    The project provides information which could be used to accelerate the commercialization and market penetration of solar electric generation plants in the southwestern region of the United States. The area of concern includes Arizona, California, Colorado, Nevada, New Mexico, Utah, and sections of Oklahoma and Texas. The project evaluated the potential integration of solar electric generating facilities into the existing electric grids of the region through the year 2000. The technologies included wind energy conversion, solar thermal electric, solar photovoltaic conversion, and hybrid solar electric systems. Each of the technologies considered, except hybrid solar electric, was paired with a compatible energy storage system to improve plant performance and enhance applicability to a utility grid system. The hybrid concept utilizes a conventionally-fueled steam generator as well as a solar steam generator so it is not as dependent upon the availability of solar energy as are the other concepts. Operation of solar electric generating plants in conjunction with existing hydroelectric power facilities was also studied. The participants included 12 electric utility companies and a state power authority in the southwestern US, as well as a major consulting engineering firm. An assessment of the state-of-the-art of solar electric generating plants from an electric utility standpoint; identification of the electric utility industry's technical requirements and considerations for solar electric generating plants; estimation of the capital investment, operation, and maintenance costs for solar electric generating plants; and determination of the capital investment of conventional fossil and nuclear electric generating plants are presented. (MCW)

  16. Remote monitoring: A global partnership for safeguards

    International Nuclear Information System (INIS)

    Bardsley, J.

    1996-01-01

    With increased awareness of the significant changes of the past several years and their effect on the expectations to international safeguards, it is necessary to reflect on the direction for development of nuclear safeguards in a new era and the resulting implications. The time proven monitoring techniques, based on quantitative factors and demonstrated universal application, have shown their merit. However, the new expectations suggest a possibility that a future IAEA safeguards system could rely more heavily on the value of a comprehensive, transparent, and open implementation regime. With the establishment of such a regime, it is highly likely that remote monitoring will play a significant role. Several states have seen value in cooperating with each other to address the many problems associated with the remote interrogation of integrated monitoring systems. As a consequence the International Remote Monitoring Project was organized to examine the future of remote monitoring in International Safeguards. This paper provides an update on the technical issues, the future plans, and the safeguards implications of cooperative programs relating to remote monitoring. Without providing answers to the policy questions involved, it suggests that it is timely to begin addressing these issues

  17. Procedural Influence on Internal and External Assessment Scores of Undergraduate Vocational and Technical Education Research Projects in Nigerian Universities

    Science.gov (United States)

    A. C., John; Manabete, S. S.

    2015-01-01

    This study sought to determine the procedural influence on internal and external assessment scores of undergraduate research projects in vocational and technical education programmes in the university under study. A survey research design was used for the conduct of this study. The population consisted of 130 lecturers and 1,847 students in the…

  18. INFLUENCE OF ORGANIZATIONAL AND TECHNOLOGICAL SOLUTIONS TO TECHNICAL AND ECONOMICAL INDICATORS IN PROJECT OF HEAT INSULATION FACADES

    Directory of Open Access Journals (Sweden)

    BABIJ I. N. Cand. Sc. (Tech., Associate Professor,

    2016-09-01

    Full Text Available Summary. Raising of problem. The article dedicated to the solution important problems of choosing rational technical and economic indicators of the duration and cost the process heat insulation facades of buildings by means of experimental and statistical modeling organizational and technological solutions. For this we used the results of numerical experiment, theory a shorthand experiment planning and contemporary computer programs. Purpose. We used experimentally-statistical modeling to establish the impact of organizational and technological solutions for heat insulation of facades by hinged ventilated systems on technical and economic parameters of the project, such as duration and cost. Conclusion. We investigated depending duration assembly jobs and manufacturing cost on the value and combination of variable factors experimental and statistical modeling of construction processes and results patterns of change in studied parameters.

  19. Introduction of a prehospital critical incident monitoring system--pilot project results.

    Science.gov (United States)

    Stella, Julian; Davis, Anna; Jennings, Paul; Bartley, Bruce

    2008-01-01

    Hospital medical incident monitoring improves preventable morbidity and mortality rates. Error management systems have been adopted widely in this setting. Data relating to incident monitoring in the prehospital setting is limited. Implementation of an incident monitoring process in a prehospital setting. This is a prospective, descriptive study of the pilot phase of the implementation of an incident monitoring process in a regional prehospital setting, with a focus on trauma care. Paramedics and emergency department staff submitted anonymous incident reports, and a chart review was performed on patients who met major trauma criteria. Selected trauma cases were analyzed by a structured interview/debriefing process to elucidate undocumented incidents. A project committee coded and logged all incidents and developed recommendations. Of 4,429 ambulance responses, 41 cases were analyzed. Twenty-four (58.5%; 95% CI = 49.7-67.4%) were reported anonymously, and the rest were major trauma patients. A total of 77 incidents were identified (mean per case = 1.8; CI = 1.03-2.57). Anonymous cases revealed 26 incidents (mean = 1.1; CI = 0.98-1.22); eight trauma debriefings revealed 38 incidents (mean = 4.8; CI = 0.91-8.69) and nine trauma chart reviews revealed 13 incidents (mean = 1.6; CI = 1.04-2.16). A total of 56 of 77 (72.7%; CI = 65.5-80.0%) incidents related to system inadequacies, and 15 (57.7%; CI = 46.7-68.6%) anonymously reported incidents related to resource problems. A total of 35 of 77 (45.5%; CI = 40.4-50.5%) incidents had minimal or no impact on the patients' outcomes. Thirty-four of 77 (44.2%; CI = 39.3-49.1%) incidents were considered mitigated by circumstance. Incident monitoring led to generalized feedback in most cases (65 of 77; 84.4%; CI = 77.6-91.3%); in three cases (3.9%; CI = 3.7-4.1%), specific education occurred; two cases were reported to an external body (2.6%; CI = 2.5-2.7%); three cases resulted in remedial action (3.9%; CI = 3.7-4.1%); four for

  20. Calibration of alpha-track monitors for measurement of thoron

    International Nuclear Information System (INIS)

    Pearson, M.D.

    1990-03-01

    The US Department of Energy (DOE) Office of Remedial Action and Waste Technology established the Technical Measurements Center (TMC) at the DOE Grand Junction Projects Office (GJPO) to provide standardization, calibration, verification of data, quality assurance, and cost-effectiveness for environmental measurements associated with the various DOE remedial action programs. The GJPO Radon Laboratory has conducted a number of studies evaluating the precision and accuracy of alpha-track monitors for the measurement of airborne radon (Rn-222) concentration. These studies have demonstrated the usefulness of using alpha-track monitors to measure radon. Alpha-track devices have also been proposed for estimating concentrations of thoron (Rn-220). 9 refs., 7 figs., 4 tabs