WorldWideScience

Sample records for project team project

  1. MANAGING MULTICULTURAL PROJECT TEAMS

    Directory of Open Access Journals (Sweden)

    Cezar SCARLAT

    2014-06-01

    Full Text Available The article is based on literature review and authors’ own recent experience in managing multicultural project teams, in international environment. This comparative study considers two groups of projects: technical assistance (TA projects versus information technology (IT projects. The aim is to explore the size and structure of the project teams – according to the team formation and its lifecycle, and to identify some distinctive attributes of the project teams – both similarities and differences between the above mentioned types of projects. Distinct focus of the research is on the multiculturalism of the project teams: how the cultural background of the team members influences the team performance and team management. Besides the results of the study are the managerial implications: how the team managers could soften the cultural clash, and avoid inter-cultural misunderstandings and even conflicts – in order to get a better performance. Some practical examples are provided as well.

  2. Perspectives on projects, project success and team work

    OpenAIRE

    Thompson, Karen

    2015-01-01

    This paper brings together perspectives on projects, project success and team work as a background to two graphical tools for considering project success and individual capabilities for working in a project team.

  3. Relationships among Team Trust, Team Cohesion, Team Satisfaction and Project Team Effectiveness as Perceived by Project Managers in Malaysia

    OpenAIRE

    Han-Ping Fung

    2014-01-01

    Today, more and more project teams are formed to achieve organizational objectives as organizations generally recognized the importance and benefits of project teams. There is a compelling reason to study what are the team outcome factors that can predict project team effectiveness as it is unclear whether these team outcome factors can yield the same result in project setting whereby there is resource and time constraint compare to normal work teams which are ongoing and operational in natur...

  4. Team work on international projects

    International Nuclear Information System (INIS)

    Hayfield, F.

    1983-01-01

    A successful team will result in Project efficiency and so lead to a better achievement of the Project objectives. Such a team will be self-motivating and have a high level of morale. An effective team will also create a better context for transfer of know-how and so better prepare its members for greater roles on future Project teams. The nature of Project work forces the process of team building to recognize several facts of life. A Project team can have a life as short as one year and as long as ten years. A team usually consists of people on temporary transfer from different departments yet retaining a link of some sort to their departments of origin. It may consist of members of one company only or of several as in a joint-venture and may include Client personnel. On International Projects, the members of a team may have different nationalities and be working in a language foreign to many of them. Many of the Project people may be expatriates to the Project area on a bachelor or on a married status well away from their head or usual office. Team building is a complex organizational and human process, with no mathematical formula for the ideal solution. It starts with the selection of the right Project Manager who should be a leader, a technocrat manager and an integrator all at the same time. The Project Manager must have the authority to create the organizational and human climate that will motivate to a maximum each member of the team. Each member must understand clearly his role and realize that this contribution to the Project will influence his career development. Loyalty to the Project Manager must be possible and the Departmental Manager has to recognize this necessity. This presentation will indicate the basic steps of a team building process on a typical major international Project

  5. Virtual Project Teams

    DEFF Research Database (Denmark)

    Bjørn, Pernille

    technology in six real-life virtual teams, two in industry and four in education, applying interpretative research and action research methods. Two main lines of investigation are pursued: the first involves an examination of the organisational issues related to groupware adaptation in virtual project teams......, professional disciplines, time differences and technology. This thesis comprises a general introduction, referred to as the summary report, and seven research papers, which deal in detail with the results and findings of the empirical cases. The summary report provides a general introduction to the research......, while the second looks at the social context and practices of virtual project teams. Two of the key findings are 1) that the process of groupware adaptation by virtual project teams can be viewed as a process of expanding and aligning the technological frames of the participants, which includes mutual...

  6. Managing projects a team-based approach

    CERN Document Server

    Brown, Karen A

    2010-01-01

    Students today are likely to be assigned to project teams or to be project managers almost immediately in their first job. Managing Projects: A Team-Based Approach was written for a wide range of stakeholders, including project managers, project team members, support personnel, functional mangers who provide resources for projects, project customers (and customer representatives), project sponsors, project subcontractors, and anyone who plays a role in the project delivery process. The need for project management is on the rise as product life cycles compress, demand for IT systems increases, and business takes on an increasingly global character. This book adds to the project management knowledge base in a way that fills an unmet need—it shows how teams can apply many of the standard project management tools, as well as several tools that are relatively new to the field. Managing Projects: A Team-Based Approach offers the academic rigor found in most textbooks along with the practical attributes often foun...

  7. Planning for high performance project teams

    International Nuclear Information System (INIS)

    Reed, W.; Keeney, J.; Westney, R.

    1997-01-01

    Both industry-wide research and corporate benchmarking studies confirm the significant savings in cost and time that result from early planning of a project. Amoco's Team Planning Workshop combines long-term strategic project planning and short-term tactical planning with team building to provide the basis for high performing project teams, better project planning, and effective implementation of the Amoco Common Process for managing projects

  8. Integrated Project Teams - An Essential Element of Project Management during Project Planning and Execution - 12155

    Energy Technology Data Exchange (ETDEWEB)

    Burritt, James G.; Berkey, Edgar [Longenecker and Associates, Las Vegas, NV 89135 (United States)

    2012-07-01

    Managing complex projects requires a capable, effective project manager to be in place, who is assisted by a team of competent assistants in various relevant disciplines. This team of assistants is known as the Integrated Project Team (IPT). he IPT is composed of a multidisciplinary group of people who are collectively responsible for delivering a defined project outcome and who plan, execute, and implement over the entire life-cycle of a project, which can be a facility being constructed or a system being acquired. An ideal IPT includes empowered representatives from all functional areas involved with a project-such as engineering design, technology, manufacturing, test and evaluation, contracts, legal, logistics, and especially, the customer. Effective IPTs are an essential element of scope, cost, and schedule control for any complex, large construction project, whether funded by DOE or another organization. By recently assessing a number of major, on-going DOE waste management projects, the characteristics of high performing IPTs have been defined as well as the reasons for potential IPT failure. Project managers should use IPTs to plan and execute projects, but the IPTs must be properly constituted and the members capable and empowered. For them to be effective, the project manager must select the right team, and provide them with the training and guidance for them to be effective. IPT members must treat their IPT assignment as a primary duty, not some ancillary function. All team members must have an understanding of the factors associated with successful IPTs, and the reasons that some IPTs fail. Integrated Project Teams should be used by both government and industry. (authors)

  9. A new approach to cost effective projects: High performance project teams

    International Nuclear Information System (INIS)

    Chambers, N.C.

    1994-01-01

    In low oil price environment in which environmental conditions are more challenging, reservoir characteristics less favourable and political risk increasing, successful projects are required in such cases. The present paper deals with the visionary process of establishing high performance project teams. According to the author, such project teams embody dynamic recognition of holism. Holism is achieved as an output from the process of establishing the drivers and enablers for success on a project. They are given birth during the unfolding of the operators development plans and contracting strategy. The paper discusses the main drivers of project teams comprising purpose and performance goals, selection, common approach, commitment and accountability, and financial alignment

  10. A new approach to cost effective projects: High performance project teams

    Energy Technology Data Exchange (ETDEWEB)

    Chambers, N.C. [Brown and Root Energy Services (United Kingdom)

    1994-12-31

    In low oil price environment in which environmental conditions are more challenging, reservoir characteristics less favourable and political risk increasing, successful projects are required in such cases. The present paper deals with the visionary process of establishing high performance project teams. According to the author, such project teams embody dynamic recognition of holism. Holism is achieved as an output from the process of establishing the drivers and enablers for success on a project. They are given birth during the unfolding of the operators development plans and contracting strategy. The paper discusses the main drivers of project teams comprising purpose and performance goals, selection, common approach, commitment and accountability, and financial alignment

  11. The Project Team: Features, Effectiveness and Leadership

    Directory of Open Access Journals (Sweden)

    Ramona-Elena GABREA

    2017-06-01

    Full Text Available The project team that is responsible for providing flexibility and innovation to this structure in order to enable organizations to remain successful (1. The very nature of the project team's work underpins a collective task much more complex than that assumed by other types of work teams. The aim of this paper is to explore the main factors that determine the project team effectiveness. The research methodology was the literature review. The main finding reveals that the organizational structure of projects and the project team should not be considered as a panacea for all problems of organizational effectiveness.

  12. Building Productivity in Virtual Project Teams

    Directory of Open Access Journals (Sweden)

    Bill Hamersly

    2015-04-01

    Full Text Available The steady increase in project failure rates is leaving businesses searching for better integration techniques to virtualize their project environments. Through virtualization, organizations may have positive impacts on communities across geographical boundaries and resource constraints. The focus of this phenomenological study was to explore, via the experiences of successful project management practitioners, best practice strategies for integrating virtual project teams through data analysis. The conceptual framework included von Bertalanffy’s general systems theory, decomposition model of business process and project management frameworks, and the recomposition approach. Twenty-two senior project managers with more than 5 years of experience managing virtual project environments participated in semistructured telephone interviews. The van Kaam process employing normalization and bracketing approaches in data analysis resulted in the emergence of 34 thematic categories. The 10 most common themes culminated in the identification of strategies relevant for virtual project teams. The major themes pertained to 3 broad areas: (a structure that accommodates skills and technology for virtual team success, (b governance leading to efficient virtual project team management, and (c collaboration practices across diverse environments. This study involved the exploration of the experiences of the participants. Using the van Kaam method for normalization of the data and clustering like experiences into thematic statements, the study provided a plethora of new information concentrated on 10 themes that emerged.

  13. Evaluation on Collaborative Satisfaction for Project Management Team in Integrated Project Delivery Mode

    Science.gov (United States)

    Zhang, L.; Li, Y.; Wu, Q.

    2013-05-01

    Integrated Project Delivery (IPD) is a newly-developed project delivery approach for construction projects, and the level of collaboration of project management team is crucial to the success of its implementation. Existing research has shown that collaborative satisfaction is one of the key indicators of team collaboration. By reviewing the literature on team collaborative satisfaction and taking into consideration the characteristics of IPD projects, this paper summarizes the factors that influence collaborative satisfaction of IPD project management team. Based on these factors, this research develops a fuzzy linguistic method to effectively evaluate the level of team collaborative satisfaction, in which the authors adopted the 2-tuple linguistic variables and 2-tuple linguistic hybrid average operators to enhance the objectivity and accuracy of the evaluation. The paper demonstrates the practicality and effectiveness of the method through carrying out a case study with the method.

  14. 33 CFR 385.17 - Project Delivery Team.

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Project Delivery Team. 385.17... Processes § 385.17 Project Delivery Team. (a) In accordance with the procedures of the Corps of Engineers...,” the Corps of Engineers and the non-Federal sponsor shall form a Project Delivery Team to develop the...

  15. Defensive behaviours in innovation teams: how project teams discuss defensiveness and its relationship with innovation resilience behaviour and project success

    NARCIS (Netherlands)

    Oeij, P.R.A.; Dhondt, S.; Gaspersz, J.B.R.; Vuuren, T. van

    2016-01-01

    Project team members and project leaders of innovation projects were interviewed about the possible presence of defensive behaviours within the team. While investigating defensive behaviour can be done validly by observation techniques, to talk about defensiveness within a team often leads to

  16. First, build the project team

    Energy Technology Data Exchange (ETDEWEB)

    Snyder, J.C. [Duke/Fluor Daniel, Charlotte, NC (United States)

    1997-03-01

    The EPC consortium of American, Japanese and Indonesian companies has been formed to construct the first phase of the coal-fired Paiton Power Project in Indonesia under a lump sum turnkey contract. A Consortium Agreement defines the respective roles, scope and responsibilities, as well as allocation of risks and rewards for each member. The roles of members have been assigned to match their experience and expertise and a Division of Responsibility document has been drawn up for each stage of the project. The management of the project depends on an effective team aligning the consortium members to a common set of project goals and objectives. Communication and understanding are all important. The project team have overcome some of the challenges of differences in culture, language, contractual practice and experience between the members. Some of the systems which are in place to minimise the effect of these differences and to focus on the execution of the project are outlined. (UK)

  17. Teaching supply chain management through global projects with global project teams

    NARCIS (Netherlands)

    Kopczak, L.R.; Fransoo, J.C.

    2000-01-01

    In this article, we describe the Global Project Coordination Course, a course in which project teams composed of three students from each of two overseas universities execute company-sponsored projects dealing with global supply chain management issues. The $75,000 to $100,00 contributed in total by

  18. A multilevel study of the impact of project manager's leadership on extra-role performance of project team members

    Science.gov (United States)

    Shokory, Suzyanty Mohd; Suradi, Nur Riza Mohd

    2018-04-01

    The current study examines the impact of transformational and transactional leadership of project manager on the extra-role performance of project team members. In addition, this study also identifies factor dominant to extra-role performance of project team members when the transformational and transactional leadership of project managers are analyzed simultaneously. The study involved 175 of project team members from 35 project teams (each project team consists of different contracting companies registered in the Selangor (N = 175 from 35 contractors company). A multilevel analysis with hierarchical linear modeling (HLM) approach was used in this study. The analysis showed that transformational and transactional leadership of the project manager is a positive significant with extra-role performance project team members when analyzed separately. However when the two constructs (transformational leadership and transactional leadership of project manager) were analyzed simultaneously, transformational leadership was found to have more impact on extra-role performance project team members compared to transactional leadership. These findings explained that although transformational and transactional leadership of project managers can improve extra-role performance project team members, but this study has proved that transformational leadership of project managers affect extra-role performance project team members more as compared to transactional leadership.

  19. Team effectiveness in Non-Governmental Organizations (NGOs) projects.

    Science.gov (United States)

    Latif, Khawaja Fawad; Williams, Nigel

    2017-10-01

    The incorporation of team context into research and practice regarding team effectiveness in NGOs projects is a constant challenge. The research seeks to address the gap and identify the critical determinants of team effectiveness in projects undertaken by non-governmental organizations. Using a systematic process, the study involved both literature and focus group discussions to generate the required items. A total of 157 respondents (Team Members and Team Leaders) were part of the study that filled the questionnaires. Using exploratory factor analysis followed by confirmatory factor analysis, both convergent and discriminant validity was established. The present study found that team effectiveness in NGO social projects has a total of seven dimensions namely: Inter team coordination, community social linkage, team performance, knowledge, skills, and attitudes, leadership communication and engagement, decision making and information sharing, and team formation. There is a significant lack of research on team effectiveness in NGO projects. Where considerably large proportion of research on team effectiveness has focused on the corporate sector, the non-governmental teams have been neglected. This study clearly highlights the determinants that make up team effectiveness in NGOs. The determinants identified will help to specifically look at the effectiveness of teams in NGO projects. The study would help NGOs identify the dimensions in which they may be performing in a weaker manner and direct their energies in improving the factors. Copyright © 2017 Elsevier Ltd. All rights reserved.

  20. The Use of Virtual Project Teams for Project Management in Jordanian Corporations

    Directory of Open Access Journals (Sweden)

    Belal Hashem Alnsour

    2014-09-01

    Full Text Available Jordanian companies need virtual project teams that can use advanced technology to solve problems and make specialist multi perspective decisions when working across different and distance location. The main mission of the team is to make decisions through interdependent specialists and perspectives. In terms of its use and application, the virtual project team is a difficult challenge for Jordan corporations. This study aims to explore such applications and to detect which factors face virtual project teams in the Jordanian situation. The author focused on how to explore and gain a deeper understanding from a virtual team’s perspective, and team members’ opinions of the factors in the organization that support or hinder the mission. More specifically, this research sought to discover precisely which factors in an organization support virtual project teams, and how they can develop a support system which enables their work in an Arab environment. The main objective was to identify the effects of all factors on the efficiency of virtual teams. The research used empirical case studies from three Jordanian corporations in the communication sector which operate in a high-tech environment, and used surveys to collect data. Structured interviews with both management and team members during the study discovered that the use of virtual teams within Jordanian companies is still limited, and detected that the main factors which hinder their development in many corporations is the level of trust in the ability of virtual teams, together with the high level of centralized decision making in Jordanian corporations. Additionally, communication and coordination affect the execution of work processes and methods for virtual teams, together with a general weakness which exists in terms of infrastructure, resources and technology within the corporation, which then impacts on the efficiency of virtual team work.

  1. Creating a Realistic Context for Team Projects in HCI

    NARCIS (Netherlands)

    Koppelman, Herman; van Dijk, Betsy

    2006-01-01

    Team projects are nowadays common practice in HCI education. This paper focuses on the role of clients and users in team projects in introductory HCI courses. In order to provide projects with a realistic context we invite people from industry to serve as clients for the student teams. Some of them

  2. LEADERSHIP AS A FACTOR FOR BUILDING A PROJECT TEAM

    Directory of Open Access Journals (Sweden)

    Marina Grynchenko

    2018-03-01

    Full Text Available The subject matter of the article is to determine the role of leadership for building a project team as the team quality and the professionalism of the team participants play a key role in ensuring the proper work performance that is specified by the tasks of the project. The goal of the article is to reveal the significance of the capability of a leader to build a project team and to develop in it a favorable psychological climate, common values and ideals and show the place of this capability in the general system of the leader’s behavioural competences, that is to justify the importance of this skill and its application to increase the effectiveness of the impact of leadership on the project team. The objectives of the study involve  - identifying a project team as a complex social organism where highly qualified people perform a specific set of functions; - emphasizing the fact that different individual features and qualities of participants greatly complicate the process of building a project team as well as  coordinating the goals, aspirations and interests of team participants. Besides, the students who study Project Management should be familiarized with the methods of acquiring the knowledge and developing skills necessary for building a team. The methods of the study involve the analysis of the role of motivation in the process of team building since while building a team the leader has to solve many problems and the issues of motivation are among them. Second, the character of relations among the participants and the rational organization of their efficient teamwork should be analyzed. Third, the analysis of the leader’s capability to foster the professional and personal development of the participants in the teamwork is of great importance. Fourth, the effective method of cultivating in leaders the skills of building a team is increasing the level of teaching behavioural competences using innovative pedagogical techniques

  3. Knowledge management in design teams using a project website

    OpenAIRE

    Otter, den, A.F.H.J.; Lima, C.P

    2007-01-01

    In this paper the sharing of knowledge in architectural design teams using a Project Website is discussed. The results of multiple case studies, being part of a recently finished PhD research project to communication and performance of design teams using a Project Website, show that systems for sharing of knowledge in such teams are hard to change and better systems are difficult to implement for various reasons. Sharing of knowledge in such teams is important for collective understanding of ...

  4. Knowledge management in design teams using a project website

    NARCIS (Netherlands)

    Otter, den A.F.H.J.; Lima, C.P

    2007-01-01

    In this paper the sharing of knowledge in architectural design teams using a Project Website is discussed. The results of multiple case studies, being part of a recently finished PhD research project to communication and performance of design teams using a Project Website, show that systems for

  5. Students’ Team Project Experiences and Their Attitudes Towards Teamwork

    Directory of Open Access Journals (Sweden)

    Aleksandra Rudawska

    2017-03-01

    Full Text Available Purpose: The aim of the study is to evaluate the influence of team project experiences of students (presence and role of a leader; fairness in team projects; conditions supporting teamwork created by a university on their attitudes towards teamwork, especially the perception of teamwork effectiveness and the preference of working in teams. Methodology: In the study the quantitative research was done among master degree Polish students of Management (105 questionnaires. The measures used for the study were developed specifcally for the study referring to the previous research in the feld. Findings: Results indicate that leaders in team projects and conditions supporting teamwork are connected with the students’ perception of teamwork effectiveness, while the fairness in team projects is connected with students’ preference of working collectively. Research implications: We conclude that in order to develop a positive attitude towards teamwork, the teamwork projects should be better supported by the instructors (especially supporting the emergence of leader(s and minimising the problem of free riders and the university should create a climate that facilitates teamworking, otherwise team projects might negatively influence students’ attitude towards collective work. Value: On the labour market the teamwork skills are one of the most important skills of employees, as the team-based organizational designs are becoming the norm in work organization. The study is contributing to the understanding of the relations between student experiences and their attitudes as well as the role played by high education in the development of these attitudes. Some previous research in Anglo-Saxon culture countries indicate that team project assignments realised by students during studies might even hinder their attitudes to teamwork and their willingness to work in teams in the future.

  6. DIPLOMA PROJECT TEAM WORK MANAGEMENT

    Directory of Open Access Journals (Sweden)

    V. S. Kruglyk

    2014-04-01

    Full Text Available During the work performance students should get the maximal approach to the process of real project execution, so the project should include the need to use the latest technology, integration of data or services with different developments, architecture design, interaction of the team members and others. Implementation of graduation projects is the useful activity for the acquisition and consolidation of key IT competencies. Since the task of educational projects is maximal close to real one, students participate almost in all typical stages of commercial product’s development, and do so successfully. This is also confirmed practically: students, who were actively engaged in some projects at the university, have key positions in IT companies of the city and country after that. The main objective of the paper is to describe the organization of a common group students’ work on a degree project, implementation peculiarity of such projects, recommendations for improving the quality of projects. Thus, the paper is devoted to the peculiarities of the joint students’ work on a project during diploma execution in IT specialties, as the final part of the acquisition and consolidation process of key IT competencies of future programmers. The problem of choosing work topic, project concept, work organization in a group, implementation process organization has been considered. Also the specific stages of software development have been considered: development of interface, choice of technology, product quality, project disposal to the next developers, project completion.

  7. Dream Team - A pregraduate surgical talent development project

    DEFF Research Database (Denmark)

    Jensen, Rune Dall; Seyer-Hansen, Mikkel; Christensen, Mette Krogh

    Dream Team is an extracurricular pregraduate surgical talent development project founded in 2009 at Aarhus University Hospital, Denmark. It aims to identify and develop laparoscopic surgical talents during medical school. Dream Team contains two parts: 1) a weeklong boot camp where app. 10 % of 8th...... the mentorship the students will be in operation room at least once a week and participate as much as their skills allow. Dream Team differs from similar pregraduate programs as it selects the most talented students, but does the boot camp select the best and does the mentorship program provide optimal learning......? A PhD project aims to critically analyze and develop Dream Team. The PhD project is based on theories about deliberate practice[1] and social learning[2]. In addition, we compare surgical talent development[3][4] with talent development in elite sport in order to inspire, refine and develop Dream Team...

  8. Occupational emerging risks affecting international virtual project Team Results

    Directory of Open Access Journals (Sweden)

    Dumitraşcu-Băldău Iulia

    2017-01-01

    Full Text Available The expansion of internet access, high-speed connection services, collaborative work platforms and tools, allowed employees to interact virtually offering companies the possibility to develop projects around the world, reducing operational costs and gain competitive advantage. Realizing the advantages and disadvantages of developing a project team in an international virtual work environment, requires adopting specific strategies to construct an effective team and ensure the project success. One of the most important disadvantages that we identified is that the new work environment brings new risks for both team members and managers. So, it becomes mandatory to identify and analyze the occupational emerging risks and their impact on the productivity of virtual team members, in order to prevent them efficiently and to ensure the safety and health of employees in a virtual working environment. This paper aims to highlight the necessity for project managers and organizations, to include in their specific project strategies, an efficient occupational risks management in the virtual workplace, to obtain a continuously improved virtual working environment, so to achieve a high performance from virtual employees.

  9. The Automated Assembly Team contributions to the APRIMED Agile Manufacturing Project

    International Nuclear Information System (INIS)

    Jones, R.E.; Ames, A.L.; Calton, T.L.

    1995-06-01

    The Automated Assembly Team of the APRIMED Project (abbreviated as A') consists of two parts: the Archimedes Project, which is an ongoing project developing automated assembly technology, and the A' Robot Team. Archimedes is a second generation assembly planning system that both provides a general high-level assembly sequencing capability and, for a smaller class of products, facilitates automatic programming of a robotic workcell to assemble them. The A' robot team designed, developed, and implemented a flexible robot workcell which served as the automated factory of the A' project. In this document we briefly describe the role of automated assembly planning in agile manufacturing, and specifically describe the contributions of the Archimedes project and the A' robot team to the A' project. We introduce the concepts of the Archimedes automated assembly planning project, and discuss the enhancements to Archimedes which were developed in response to the needs of the A' project. We also present the work of the A' robot team in designing and developing the A' robot workcell, including all tooling and programming to support assembly of the A' discriminator devices. Finally, we discuss the process changes which these technologies have enabled in the A' project

  10. A Team Building Model for Software Engineering Courses Term Projects

    Science.gov (United States)

    Sahin, Yasar Guneri

    2011-01-01

    This paper proposes a new model for team building, which enables teachers to build coherent teams rapidly and fairly for the term projects of software engineering courses. Moreover, the model can also be used to build teams for any type of project, if the team member candidates are students, or if they are inexperienced on a certain subject. The…

  11. Problem-Based Service Learning: The Evolution of a Team Project

    Science.gov (United States)

    Connor-Greene, Patricia A.

    2002-01-01

    In this article, I describe the evolution of a problem-based service learning project in an undergraduate Abnormal Psychology course. Students worked in teams on a semester-long project to locate and evaluate information and treatment for specific psychiatric disorders. As part of the project, each team selected relevant bibliographic materials,…

  12. A Project Team: A Team or Just a Group?

    Directory of Open Access Journals (Sweden)

    Katerina Hrazdilova Bockova

    2013-11-01

    Full Text Available This paper deals with issues related to work in either teams or groups. The theoretical part which discusses a team and a group with regards to its definition, classification and basic distinction brings in more on the typology of team roles, personality assessment and sociometric methods. The analytical part tests the project (work team of a medical center represented in terms of personality and motivational types, team roles and interpersonal team relations concerning the willingness of cooperation and communication. The main objective of this work was to determine whether the existing team is not by its nature rather a working group that contributes to the generally perceived stagnation of that field.

  13. Team dynamics in complex projects

    NARCIS (Netherlands)

    Oeij, P.; Vroome, E.E.M. de; Dhondt, S.; Gaspersz, J.B.R.

    2012-01-01

    Complexity of projects is hotly debated and a factor which affects innovativeness of team performance. Much attention in the past is paid to technical complexity and many issues are related to natural and physical sciences. A growing awareness of the importance of socioorganisational issues is

  14. Students’ Team Project Experiences and Their Attitudes Towards Teamwork

    OpenAIRE

    Aleksandra Rudawska

    2017-01-01

    Purpose: The aim of the study is to evaluate the influence of team project experiences of students (presence and role of a leader; fairness in team projects; conditions supporting teamwork created by a university) on their attitudes towards teamwork, especially the perception of teamwork effectiveness and the preference of working in teams. Methodology: In the study the quantitative research was done among master degree Polish students of Management (105 questionnaires). The measures used f...

  15. Methodology Proposal for Increasing Swift Trust within Virtual Teams in the Inception Phase of a Project Life-Cycle: Project Manager’s Perspective

    Directory of Open Access Journals (Sweden)

    Milovanović Bojan Morić

    2015-12-01

    Full Text Available This paper proposes team building methodology for project managers in virtual teams as means to develop swift trust between new team members in the inception phase of the project life cycle. Proposed methodology encompasses activities within the first three days after the team formation and proposes the measuring tools for monitoring and managing trust development within the project team. Aim of this paper is to provide new insights to various decision makers potentially interested in increasing the performance of project teams operating in virtual environment, such as: investors, business owners and project managers working in virtual environment.

  16. Experiences with Designing a Team Project Module for Teaching Teamwork to Students

    OpenAIRE

    Bieliková, Mária

    2005-01-01

    Team projects play an important role in the education of engineers. This paper describes a team project module (called Team project) that is part of a postgraduate course in Informatics. Its main objective is to give students a hands-on experience with different aspects of working in team on a problem. We discuss several aspects that should be considered in designing such module as a part of a curriculum: team formation, team communication, team assessment, problem statement and assignment, d...

  17. Team research at the biology-mathematics interface: project management perspectives.

    Science.gov (United States)

    Milton, John G; Radunskaya, Ami E; Lee, Arthur H; de Pillis, Lisette G; Bartlett, Diana F

    2010-01-01

    The success of interdisciplinary research teams depends largely upon skills related to team performance. We evaluated student and team performance for undergraduate biology and mathematics students who participated in summer research projects conducted in off-campus laboratories. The student teams were composed of a student with a mathematics background and an experimentally oriented biology student. The team mentors typically ranked the students' performance very good to excellent over a range of attributes that included creativity and ability to conduct independent research. However, the research teams experienced problems meeting prespecified deadlines due to poor time and project management skills. Because time and project management skills can be readily taught and moreover typically reflect good research practices, simple modifications should be made to undergraduate curricula so that the promise of initiatives, such as MATH-BIO 2010, can be implemented.

  18. Intercultural team maturity model: Unity, diversity, capability. Achieving optimal performance when leading \\ud a multicultural project team

    OpenAIRE

    Prabhakar, G. P.; Walker, S.

    2005-01-01

    Our research helps to judge ‘maturity’ as an asset to projects and heightens awareness of situational leadership, using intercultural team maturity levels as a tool for optimal project leadership success.\\ud \\ud This study focuses on exactly how to analyse the team members’ ability to adapt to complex intercultural project environments, using an intercultural team maturity model.

  19. Leadership and organizational tenure diversity as determinants of project team effectiveness

    NARCIS (Netherlands)

    de Poel, Frouke M.; Stoker, Janka I.; Van der Zee, Karen I.

    2014-01-01

    The present study reveals how leadership effectiveness in project teams is dependent on the level of organizational tenure diversity. Data from 34 project teams showed that transformational leadership is related to organizational commitment, creative behavior, and job satisfaction, but only in teams

  20. Leadership and Organizational Tenure Diversity as Determinants of Project Team Effectiveness

    NARCIS (Netherlands)

    de Poel, Frouke M.; Stoker, Janka I.; Van der Zee, Karen I.

    2014-01-01

    The present study reveals how leadership effectiveness in project teams is dependent on the level of organizational tenure diversity. Data from 34 project teams showed that transformational leadership is related to organizational commitment, creative behavior, and job satisfaction, but only in teams

  1. Change Management for using a Project Website in Design Team Communication

    NARCIS (Netherlands)

    Otter, den A.F.H.J.; Emitt, S.; Prins, M.

    2005-01-01

    A Project Website (PWS) has been advocated as an important tool for design teams of construction projects, because the tool is supposed to greatly enhance team communication. This, finally, should result in improved team performance in terms of increase of efficiency and effectiveness. PWS vendors

  2. A Project Team: a Team or Just a Group?

    Directory of Open Access Journals (Sweden)

    Kateřina

    2014-06-01

    Full Text Available This paper deals with issues related to work in either teams or groups. The theoretical part discusses a team and a group with regards to its definition, classification and basic distinction, brings in more on the typology of team roles, personality assessment and sociometric methods. The analytical part tests the project (work team of a medical center represented in terms of personality and motivational types, team roles and interpersonal team relations concerning the willingness of cooperation and communication. The main objective of this work is to verify the validity of the assumptions that the analyzed team represents a very disparate group as for its composition from the perspective of personality types, types of motivation, team roles and interpersonal relations in terms of the willingness of cooperation and communication. A separate output shall focus on sociometric investigation of those team members where willingness to work together and communicate is based on the authors’ assumption of tight interdependence.

  3. Sourcing Team Behavior in Project-Based MNE's

    DEFF Research Database (Denmark)

    Hansen, Anders Peder Lysholm

    2014-01-01

    across the three cases was characterized by conflict between departments represented in the category teams. This resulted in unfortunate sourcing team behaviour and unaligned performance management, which in turn had a number of adverse effects. Further research on how to create a holistic and balanced......This paper presents and discusses a multiple case study of three cross-functional category teams responsible for sourcing critical components within multi-national, project-based enterprises. The study focused on behaviour and management of the sourcing teams and found that the sourcing process...... team perspective in the sourcing teams is suggested....

  4. Cooperative Learning through Team-Based Projects in the Biotechnology Industry.

    Science.gov (United States)

    Luginbuhl, Sarah C; Hamilton, Paul T

    2013-01-01

    We have developed a cooperative-learning, case studies project model that has teams of students working with biotechnology professionals on company-specific problems. These semester-long, team-based projects can be used effectively to provide students with valuable skills in an industry environment and experience addressing real issues faced by biotechnology companies. Using peer-evaluations, we have seen improvement in students' professional skills such as time-management, quality of work, and level of contribution over multiple semesters. This model of team-based, industry-sponsored projects could be implemented in other college and university courses/programs to promote professional skills and expose students to an industry setting.

  5. Cultural Issue and its Influence in the Management of Global Project Teams

    Directory of Open Access Journals (Sweden)

    Nadia Lima

    2016-04-01

    Full Text Available The interactions between the project manager and team members may be affected by several variables, such as culture, leadership style of the project manager, and the complexity of the developed tasks. Focused in this context, the objective of this paper is to investigate and describe how the culture issue can affect the anagement of global project teams. It is a qualitative, descriptive study conducted in a large multinational company in the automotive sector. The results of this research show that cultural issues can influence both positively and negatively the management of project global teams and the managers of these projects have to deal with several management challenges that require the adoption of certain ways of dealing with culture impacts in managing their teams to minimize potential problems in this context.

  6. Distributed team cohesion – not an oxymoron. The impact of information and communications technologies on teamness in globally distributed IT projects

    Directory of Open Access Journals (Sweden)

    Olga Stawnicza

    2015-01-01

    Full Text Available Globally distributed IT projects are common practice in today’s globalized world. Typically, project team members’ work on interdependent tasks, with a common goal to be achieved as one team. However, being split between multiple locations impedes communication among team members and hampers the development of trust. Information and communications media enable communication between geographically distributed project team members and help to create and maintain trust within project units. Communication and trust are particularly significant for fostering a feeling of oneness among project team members. Oneness, also referred to as “teamness”, is repeatedly mentioned as one of the challenges facing global project teams. However, prior literature on teamness is very scarce and its importance is underrepresented. This research contributes to the field in two ways. First, the theoretical study based on a systematic literature review examines available evidence of teamness in globally distributed projects. Secondly, an empirical study based on interviews conducted with global project managers fills the current gap in literature on the link between use of ICT and establishing a sense of team unity. This paper draws practitioners’ attention to the importance of striving for teamness in spite of the geographical distance that exists between project team members.

  7. Analysis of Return on Investment in Different Types of Agile Software Development Project Teams

    Directory of Open Access Journals (Sweden)

    Goran MILANOV

    2012-01-01

    Full Text Available This exploratory study of IT project teams in Serbia investigates how the choice of agile methods in different development project teams affects the return-on-investment (ROI. In this paper different types of software project teams are analyzed in order to examine and identify the business-value of using agile methods. In various software development project teams, the ROI of agile methods is yet to be fully explored, while the ROI of traditional methods is well-understood. Since ROI is important indicator of the projects success, in this paper we examine the factors that influence the ROI both from software solution customer point of view, and different agile project teams.

  8. Managing teams performing complex innovation projects

    NARCIS (Netherlands)

    Oeij, P.R.A.; Vroome, E.M.M. de; Dhondt, S.; Gaspersz, J.B.R.

    2012-01-01

    Complexity of projects is hotly debated and a factor which affects innovativeness of team performance. Much attention in the past is paid to technical complexity and many issues are related to natural and physical sciences. A growing awareness of the importance of socio-organisational issues is

  9. Toward a model of socializing project team members : An integrative approach

    NARCIS (Netherlands)

    Batistič, S.; Kenda, R.

    2018-01-01

    Project work is becoming more and more important in everyday business, as is staffing the right newcomers for the project. Recognizing that not all new project team workers possess equally important specific knowledge, skills and abilities for the success of projects, we draw on project management,

  10. Defining Projects to Integrate Evolving Team Fundamentals and Project Management Skills

    Science.gov (United States)

    Smith, Harold, III; Smarkusky, Debra; Corrigall, Elizabeth

    2008-01-01

    Industry has indicated the desire for academic programs to produce graduates that are well-versed in collaborative problem solving and general project management concepts in addition to technical skills. The primary focus of a curriculum is typically centered on the technical training with minimal attention given to coalescing team and project…

  11. Managing Project Team in Local Government B.A. Amujiri Abstract ...

    African Journals Online (AJOL)

    Religion Dept

    government and discovered that managing project team is indispensable in local governments .... subordinate; improve employee motivation; improve communication between .... or events required in completing the project. This will help to.

  12. Using an Undergraduate Materials Research Project to Foster Multidisciplinary Teaming Skills

    Science.gov (United States)

    Newell, James A.; Cleary, Doug D.

    2004-01-01

    This paper describes the use of undergraduate materials multidisciplinary research projects as a means of addressing the growing industrial demand for graduates experienced in working in multidisciplinary teams. It includes a detailed description of a project in which a multidisciplinary team of chemical engineering and civil engineering students…

  13. Progress report on recommendations of the Flaring Project Team

    International Nuclear Information System (INIS)

    Macken, C.

    1999-01-01

    Part of the mandate of the Clean Air Strategic Alliance (CASA) is to share decision-making responsibility for air quality management with the government of Alberta, through the ministries of Environmental Protection, Energy, and Health, and the Alberta Energy and Utilities Board (EUB). CASA's vision for air quality in Alberta is that 'the air will be odourless, tasteless, look clear, and have no measurable short- or long-term adverse effects on people, animals, or the environment'. In 1997, CASA approved the establishment of the Flaring Project Team in response to public concern about potential and observed impacts associated with flaring of solution gas. Members of that team established a framework for the management of solution gas flaring. Their long-term goal is to eliminate routine flaring of solution gas. The Project Team assessed existing information on solution gas flaring, including technologies, efficiencies, emissions and impacts. Alternative technologies were also reviewed along with biological and health effects of solution gas flaring. A list of data gaps and research needs was compiled in order to help with the development of the Team's recommendations. The Team's final report was delivered in June 1998. It was recommended that the following policy objective hierarchy be used to guide decisions related to routine solution gas flaring: (1) eliminate routine solution gas flaring, (2) reduce volumes of gas flared, and (3) improve the efficiency of flares. By way of progress the Project Team was able to report that in March, 1999, the EUB issued a draft interim directive to address upstream petroleum industry flaring. The draft Directive incorporates the recommendations from the CASA Flaring Project Team with respect to management of solution gas flaring. In December 1998, changes to the royalty structure to encourage the productive use of flare gas have been announced by the Alberta Department of Energy and Alberta Environmental protection, thus

  14. An Interdisciplinary Team Project: Psychology and Computer Science Students Create Online Cognitive Tasks

    Science.gov (United States)

    Flannery, Kathleen A.; Malita, Mihaela

    2014-01-01

    We present our case study of an interdisciplinary team project for students taking either a psychology or computer science (CS) course. The project required psychology and CS students to combine their knowledge and skills to create an online cognitive task. Each interdisciplinary project team included two psychology students who conducted library…

  15. Successful project teams (in R&D environment)

    CSIR Research Space (South Africa)

    Giesler, Achmed

    2011-09-01

    Full Text Available management tools no longer give project teams a competitive edge - additional qualitative tools are required, following a systems approach. A paradigm shift away from the traditional triangle of budget, brief and time towards a stronger focus on people issues...

  16. Team Research at the Biology-Mathematics Interface: Project Management Perspectives

    Science.gov (United States)

    Milton, John G.; Radunskaya, Ami E.; Lee, Arthur H.; de Pillis, Lisette G.; Bartlett, Diana F.

    2010-01-01

    The success of interdisciplinary research teams depends largely upon skills related to team performance. We evaluated student and team performance for undergraduate biology and mathematics students who participated in summer research projects conducted in off-campus laboratories. The student teams were composed of a student with a mathematics…

  17. Team and Project Work in Engineering Practices

    Directory of Open Access Journals (Sweden)

    Anders Buch

    2015-11-01

    Full Text Available In this article, we investigate teamwork amongst professionals in engineering consultancy companies in order to discern how teamwork affects the collaboration and work practices of the professionals. The article investigates how professional engineering practices are enacted in two engineering consultancy companies in Denmark where teamwork has been or is an ideal for organizing work. Through a practice-based lens, the article sets out to investigate, firstly, how discourses about team and project work affect engineering work practices; secondly, how technologymediated management is reconciled in teamwork practices; and thirdly, how team and project work affect engineering professionalism and collaborative work practices. A practice theoretical framework informs the analysis. Teamwork is investigated as a phenomenon enacted through the sayings, doings and relatings of practitioners in landscapes of practices and the interconnectedness of the practices is traced through the setup of specific ecologies in the sites.

  18. Does team stability mediate the relationship between leadership and team learning? An empirical study among Dutch project teams

    NARCIS (Netherlands)

    Savelsbergh, Chantal M.J.H.; Poell, Rob F.; van der Heijden, Beatrice

    2014-01-01

    An exploratory field study was conducted among 30 project teams in the sectors of building and utilities, engineering and construction, infrastructure, and area decontamination and development in the Netherlands. It examined the influence of leadership on team learning behaviors and included team

  19. Does team stability mediate the relationship between leadership and team learning? : An empirical study among Dutch project teams

    NARCIS (Netherlands)

    Savelsbergh, C.; Poell, R.F.; van der Heijden, B.

    2015-01-01

    An exploratory field study was conducted among 30 project teams in the sectors of building and utilities, engineering and construction, infrastructure, and area decontamination and development in the Netherlands. It examined the influence of leadership on team learning behaviors and included team

  20. The Cultural Challenges of Managing Global Project Teams: A Study of Brazilian Multinationals

    Directory of Open Access Journals (Sweden)

    Ivete Rodrigues

    2013-04-01

    Full Text Available The internationalization of Brazilian companies brings a new reality: the need for implementation of global projects that bring, in turn, the challenge of managing multicultural teams. Since this is a recent phenomenon with little theoretical development, this study sought to understand the relationships between cultural characteristics and management teams of global projects in Brazilian multinationals. To carry this discussion forward, we studied six cases of Brazilian multinational companies, with the aim of deepening the understanding of the management of global teams, involving the planning, deployment, development and management of human resources. Among the projects studied, it was found that there is very little concern with the specific issue of multiculturalism and little inter-cultural incentive to the development of team members, which ends up hindering the construction of a global mindset, important for the Brazilian multinational companies to perform successfully abroad. Faced with this situation, each of the managerial processes mentioned were presented with a number of actions to be undertaken by the project manager in three different dimensions: the project itself, the organization and the global environment. The work contributes, thus, to enable Brazilian multinational companies to manage their global teams in order to maximize the advantages of global teams, such as increased creativity and innovative capacity, but avoid the problems that multiculturalism can bring, ranging from conflicts between people to project failure.

  1. Can teams benefit from using a mindful infrastructure when defensive behaviour threatens complex innovation projects?

    NARCIS (Netherlands)

    Oeij, P.R.A.; Dhondt, S.; Gaspersz, J.B.R.; Vroome, E.M.M. de

    2016-01-01

    Projects are often doomed to fail. An explorative case study which carried out team-based complex innovation projects in a research and technology organisation suggests three main results. 1] Project team leaders experienced that the complexity involved in the various aspects of team functioning,

  2. Project-focused activity and knowledge tracker: a unified data analysis, collaboration, and workflow tool for medicinal chemistry project teams.

    Science.gov (United States)

    Brodney, Marian D; Brosius, Arthur D; Gregory, Tracy; Heck, Steven D; Klug-McLeod, Jacquelyn L; Poss, Christopher S

    2009-12-01

    Advances in the field of drug discovery have brought an explosion in the quantity of data available to medicinal chemists and other project team members. New strategies and systems are needed to help these scientists to efficiently gather, organize, analyze, annotate, and share data about potential new drug molecules of interest to their project teams. Herein we describe a suite of integrated services and end-user applications that facilitate these activities throughout the medicinal chemistry design cycle. The Automated Data Presentation (ADP) and Virtual Compound Profiler (VCP) processes automate the gathering, organization, and storage of real and virtual molecules, respectively, and associated data. The Project-Focused Activity and Knowledge Tracker (PFAKT) provides a unified data analysis and collaboration environment, enhancing decision-making, improving team communication, and increasing efficiency.

  3. Team self-regulation and meeting deadlines in project teams: antecedents and effects of temporal consensus

    NARCIS (Netherlands)

    Gevers, J.M.P.; van Eerde, W.; Rutte, C.G.

    2009-01-01

    In a longitudinal study among 48 project teams, we investigated how temporal consensus (i.e., the extent to which team members have a shared understanding of the temporal aspects of their collective task) affects the ability of teams to establish coordinated action and meet deadlines. In addition,

  4. Management Guidelines for Database Developers' Teams in Software Development Projects

    Science.gov (United States)

    Rusu, Lazar; Lin, Yifeng; Hodosi, Georg

    Worldwide job market for database developers (DBDs) is continually increasing in last several years. In some companies, DBDs are organized as a special team (DBDs team) to support other projects and roles. As a new role, the DBDs team is facing a major problem that there are not any management guidelines for them. The team manager does not know which kinds of tasks should be assigned to this team and what practices should be used during DBDs work. Therefore in this paper we have developed a set of management guidelines, which includes 8 fundamental tasks and 17 practices from software development process, by using two methodologies Capability Maturity Model (CMM) and agile software development in particular Scrum in order to improve the DBDs team work. Moreover the management guidelines developed here has been complemented with practices from authors' experience in this area and has been evaluated in the case of a software company. The management guidelines for DBD teams presented in this paper could be very usefully for other companies too that are using a DBDs team and could contribute towards an increase of the efficiency of these teams in their work on software development projects.

  5. Total Quality Management: Analysis, Evaluation and Implementation Within ACRV Project Teams

    Science.gov (United States)

    Raiman, Laura B.

    1991-01-01

    Total quality management (TQM) is a cooperative form of doing business that relies on the talents of everyone in an organization to continually improve quality and productivity, using teams and an assortment of statistical and measurement tools. The Assured Crew Return Vehicle (ACRV) Project Office was identified as an excellent project in which to demonstrate the applications and benefits of TQM processes. As the ACRV Program moves through its various stages of development, it is vital that effectiveness and efficiency be maintained in order to provide the Space Station Freedom (SSF) crew an affordable, on-time assured return to Earth. A critical factor for the success of the ACRV is attaining the maximum benefit from the resources applied to the program. Through a series of four tutorials on various quality improvement techniques, and numerous one-on-one sessions during the SSF's 10-week term in the project office, results were obtained which are aiding the ACRV Office in implementing a disciplined, ongoing process for generating fundamental decisions and actions that shape and guide the organization. Significant advances were made in improving the processes for two particular groups - the correspondence distribution team and the WATER Test team. Numerous people from across JSC were a part of the various team activities including engineering, man systems, and safety. The work also included significant interaction with the support contractor to the ACRV Project. The results of the improvement activities can be used as models for other organizations desiring to operate under a system of continuous improvement. In particular, they have advanced the ACRV Project Teams further down the path of continuous improvement, in support of a working philosophy of TQM.

  6. Student-Led Project Teams: Significance of Regulation Strategies in High- and Low-Performing Teams

    Science.gov (United States)

    Ainsworth, Judith

    2016-01-01

    We studied group and individual co-regulatory and self-regulatory strategies of self-managed student project teams using data from intragroup peer evaluations and a postproject survey. We found that high team performers shared their research and knowledge with others, collaborated to advise and give constructive criticism, and demonstrated moral…

  7. The Trust Project - Symbiotic Human Machine Teams: Social Cueing for Trust and Reliance

    Science.gov (United States)

    2016-06-30

    AFRL-RH-WP-TR-2016-0096 THE TRUST PROJECT - SYMBIOTIC HUMAN-MACHINE TEAMS: SOCIAL CUEING FOR TRUST & RELIANCE Susan Rivers, Monika Lohani, Marissa...30 JUN 2012 – 30 JUN 2016 4. TITLE AND SUBTITLE THE TRUST PROJECT - SYMBIOTIC HUMAN-MACHINE TEAMS: SOCIAL CUEING FOR TRUST & RELIANCE 5a. CONTRACT

  8. Translational Science Project Team Managers: Qualitative Insights and Implications from Current and Previous Postdoctoral Experiences.

    Science.gov (United States)

    Wooten, Kevin C; Dann, Sara M; Finnerty, Celeste C; Kotarba, Joseph A

    2014-07-01

    The development of leadership and project management skills is increasingly important to the evolution of translational science and team-based endeavors. Team science is dependent upon individuals at various stages in their careers, inclusive of postdocs. Data from case histories, as well as from interviews with current and former postdocs, and those supervising postdocs, indicate six essential tasks required of project managers in multidisciplinary translational teams, along with eight skill-related themes critical to their success. To optimize the opportunities available and to ensure sequential development of team project management skills, a life cycle model for the development of translational team skills is proposed, ranging from graduate trainees, postdocs, assistant professors, and finally to mature scientists. Specific goals, challenges and project management roles and tasks are recommended for each stage for the life cycle.

  9. A Project Team Analysis Using Tuckman's Model of Small-Group Development.

    Science.gov (United States)

    Natvig, Deborah; Stark, Nancy L

    2016-12-01

    Concerns about equitable workloads for nursing faculty have been well documented, yet a standardized system for workload management does not exist. A project team was challenged to establish an academic workload management system when two dissimilar universities were consolidated. Tuckman's model of small-group development was used as the framework for the analysis of processes and effectiveness of a workload project team. Agendas, notes, and meeting minutes were used as the primary sources of information. Analysis revealed the challenges the team encountered. Utilization of a team charter was an effective tool in guiding the team to become a highly productive group. Lessons learned from the analysis are discussed. Guiding a diverse group into a highly productive team is complex. The use of Tuckman's model of small-group development provided a systematic mechanism to review and understand group processes and tasks. [J Nurs Educ. 2016;55(12):675-681.]. Copyright 2016, SLACK Incorporated.

  10. Involving youth with disabilities in the development and evaluation of a new advocacy training: Project TEAM.

    Science.gov (United States)

    Kramer, Jessica; Barth, Yishai; Curtis, Katie; Livingston, Kit; O'Neil, Madeline; Smith, Zach; Vallier, Samantha; Wolfe, Ashley

    2013-04-01

    This paper describes a participatory research process in which six youth with disabilities (Youth Panel) participated in the development and evaluation of a manualized advocacy training, Project TEAM (Teens making Environment and Activity Modifications). Project TEAM teaches youth with disabilities how to identify environmental barriers, generate solutions, and request accommodations. The Youth Panel conducted their evaluation after the university researcher implemented Project TEAM with three groups of trainees. The Youth Panel designed and administered a survey and focus group to evaluate enjoyment and usefulness of Project TEAM with support from an advocate/researcher. Members of the Youth Panel analyzed survey response frequencies. The advocate/researcher conducted a content analysis of the open-ended responses. Sixteen of 21 Project TEAM trainees participated in the evaluation. The evaluation results suggest that the trainees found the interactive and individualized aspects of the Project TEAM most enjoyable and useful. Some instructional materials were difficult for trainees with cognitive disabilities to understand. The Youth Panel's involvement in the development of Project TEAM may explain the relatively positive experiences reported by trainees. Project TEAM should continue to provide trainees with the opportunity to apply concepts in real-life situations. Project TEAM requires revisions to ensure it is enjoyable and useful for youth with a variety of disabilities. • Group process strategies, picture-based data collection materials, peer teamwork, and mentorship from adults with disabilities can enable youth with disabilities to engage in research. • Collaborating with youth with disabilities in the development of new rehabilitation approaches may enhance the relevance of interventions for other youth with disabilities. • Youth with cognitive disabilities participating in advocacy and environment-focused interventions may prefer interactive and

  11. Team- and project work in engineering practices

    DEFF Research Database (Denmark)

    Buch, Anders; Andersen, Vibeke

    2015-01-01

    in teamwork practices, and, thirdly, how team- and project work affect engineering professionalism and collaborative work practices. A practice theoretical framework informs the analysis. Teamwork is investigated as a phenomenon enacted through the sayings, doings and relatings of practitioners in landscapes......In this paper we investigate teamwork amongst professionals in engineering consultancy companies in order to discern how teamwork affects the collaboration and work practices of the professionals. The paper investigates how professional engineering practices are enacted in two engineering...... consultancy companies in Denmark where teamwork has been or is an ideal for organizing work. Through a practice-based lens the article sets out to investigate, firstly, how discourses about teamand project work affect engineering work practices, secondly, how technology-mediated management is reconciled...

  12. The programme benefits of improving project team communication through a contact centre

    Directory of Open Access Journals (Sweden)

    Bond-Barnard, T. J.

    2013-08-01

    Full Text Available A South African national programme to repair government infrastructure uses a contact centre (or call centre to facilitate and manage communication. An important question is: How does the contact centre benefit the programme and its projects? This study discusses the findings of a survey that quantified the benefits of the programme when the communication between team members in the programme was improved by using a contact centre. The results show that, by using a contact centre to improve the communication between project team members, their perception of communication effectiveness, quality of project deliverables, service delivery, and customer satisfaction of the programme dramatically increases.

  13. Investigating the Linkage between Intrinsic Motivation and Project Team Satisfaction in Undergraduate Agricultural Leadership Students

    Science.gov (United States)

    Lamm, Kevan W.; Carter, Hannah S.; Melendez, Marcus W.

    2014-01-01

    Organizations have increased the amount of work that is completed by project teams over the past several decades. This trend is projected to continue into the foreseeable future. In response to this trend, the academic community has increased the number of project team based learning experiences for students in classes. The challenge has been that…

  14. The Virtual Design Team: Designing Project Organizations as Engineers Design Bridges

    Directory of Open Access Journals (Sweden)

    Raymond E. Levitt

    2012-08-01

    Full Text Available This paper reports on a 20-year program of research intended to advance the theory and practice of organization design for projects from its current status as an art practiced by a handful of consultants worldwide, based on their intuition and tacit knowledge, to: (1 an “organizational engineering” craft, practiced by a new generation of organizational designers; and (2 an attractive and complementary platform for new modes of “virtual synthetic organization theory research.” The paper begins with a real-life scenario that provided the motivation for developing the Virtual Design Team (VDT, an agent-based project organizational simulation tool to help managers design the work processes and organization of project teams engaged in large, semi-routine but complex and fast-paced projects. The paper sets out the underlying philosophy, representation, reasoning, and validation of VDT, and it concludes with suggestions for future research on computational modeling for organization design to extend the frontiers of organizational micro-contingency theory and expand the range of applicability and usefulness of design tools for project organizations and supply-chain networks based on this theory.

  15. A GUIDE TO RECOMMENDATIONS FOR WORKING WITH VIRTUAL TEAMS ON PROJECTS GUIDED BY PMI

    Directory of Open Access Journals (Sweden)

    Maíra Paschoalino Fernandes Bahia

    2017-12-01

    Full Text Available Due the demand of markets to be more competitive in search of immediate results, reach high quality and low cost, the companies are seeking alternatives to have more quality, minimize the cost and speed up the time in a project. One example is work with a model of teams called virtual teams. In order to identify bottlenecks and difficulties encountered in this team model to minimize the risk of failures in a project, this study applied a survey to professionals of various nationalities with experience working with virtual teams based in projects guided by PMI good practices. At the end of this study was possible to quantify and relate the main problems listed by these professionals, which prevented them from completing the projects on time, cost and quality desired. Thus for each of the points mentioned it was suggested some recommendations for the application of tools and techniques most suitable in this context.

  16. A team leadership approach to managing the transition from construction to operations for an environmental project

    International Nuclear Information System (INIS)

    Kelly, J.W.

    1994-06-01

    This presentation describes a team approach, at the totalproject level that focused team members with common objectives, for the transition to start-up and operation of the project. The Integrated Management Team (IMT) approach has been successful for this US Department of Energy (DOE) environmental restoration project at the Hanford Site in Richland, Washington. The $53.8-million project will collect, treat, and dispose of low-level mixed waste water discharges from the Hanford Site. Construction is scheduled for completion in September 1994 and facility start-up in June 1995. The project challenge is for leadership that is committed to the transition from construction to operation of the environmental restoration project

  17. Results Without Authority Controlling a Project When the Team Doesn't Report to You

    CERN Document Server

    KENDRICK, Tom

    2012-01-01

    It's tricky enough to spearhead a big project when you're the boss. But when you're the leader of a team of people who don't report to you, the obstacles are even greater. Results Without Authority is the definitive book for project managers looking to establish credibility and control. A groundbreaker in the field, it supplies a start-to-finish system for getting successful project results from cross-functional, outsourced, and other types of teams. The completely updated second edition includes new information on: * Agile methods and evolving project management tools * Strategies for working

  18. Ready to Retrofit: The Process of Project Team Selection, Building Benchmarking, and Financing Commercial Building Energy Retrofit Projects

    Energy Technology Data Exchange (ETDEWEB)

    Sanders, Mark D. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Parrish, Kristen [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Mathew, Paul [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2012-05-01

    This guide presents a process for three key activities for the building owner in preparing to retrofit existing commercial buildings: selecting project teams, benchmarking the existing building, and financing the retrofit work. Although there are other essential steps in the retrofit process, the three activities presented in this guide are the critical elements where the building owner has the greatest influence on the outcome of the project.

  19. The international INTRAVAL project. Summary and conclusions by the TVO/VTT Team

    International Nuclear Information System (INIS)

    Hautojaervi, A.

    1994-12-01

    Teollisuuden Voima Oy (TVO) participated the international cooperation project INTRAVAL and VTT Energy acted as a project team. The Finnish participation focused on flow and transport in crystalline fractured rock and six test cases out of thirteen were tackled. The experimental results were evaluated mainly by means of analytical transport models. The report presents a short review of the experience obtained in the course of the project. It concentrates on the issues revealed in the discussions and analyses of the six test cases in which the TVO/VTT team actively participated but some of the conclusions are even more general in nature. Some suggestions are made for future experimental and theoretical work in the field of geosphere. (15 refs., 2 tabs.)

  20. SemanticOrganizer: A Customizable Semantic Repository for Distributed NASA Project Teams

    Science.gov (United States)

    Keller, Richard M.; Berrios, Daniel C.; Carvalho, Robert E.; Hall, David R.; Rich, Stephen J.; Sturken, Ian B.; Swanson, Keith J.; Wolfe, Shawn R.

    2004-01-01

    SemanticOrganizer is a collaborative knowledge management system designed to support distributed NASA projects, including diverse teams of scientists, engineers, and accident investigators. The system provides a customizable, semantically structured information repository that stores work products relevant to multiple projects of differing types. SemanticOrganizer is one of the earliest and largest semantic web applications deployed at NASA to date, and has been used in diverse contexts ranging from the investigation of Space Shuttle Columbia's accident to the search for life on other planets. Although the underlying repository employs a single unified ontology, access control and ontology customization mechanisms make the repository contents appear different for each project team. This paper describes SemanticOrganizer, its customization facilities, and a sampling of its applications. The paper also summarizes some key lessons learned from building and fielding a successful semantic web application across a wide-ranging set of domains with diverse users.

  1. Towards Integrated Team Practice: A Case of Malaysian Industrialised Building System (IBS Construction Projects

    Directory of Open Access Journals (Sweden)

    Mohd Nawi Mohd Nasrun

    2014-01-01

    Full Text Available Problems associated with fragmentation in the traditional construction process, such as isolation of professionals, lack of co-ordination between design and construction, and the sequential manner of its processes, has impacted on construction performance leading to a lack of integration, wastage, low productivity and efficiency. Integrated team practice is perceived as paramount. Unfortunately, there has a limitation of study focus on the dimension of fully integrated team especially for Malaysian Industrialised Building System (IBS projects. Accordingly, this research paper explores and identifies the dimension of fully integrated team from the traditional approach and conduct a validation process for implementing it in Malaysian IBS projects. The research presented uses interviews case study to obtain qualitative data. It was found that the dimension of fully integrated team from the traditional construction process could apply to the Malaysian IBS projects. Suggestions on how an integrated team practice in IBS design and construction process in order to minimise the fragmentation gaps will be concluded.

  2. [Dream Team--a pre-graduate surgical talent development project].

    Science.gov (United States)

    Jensen, Rune Dall; Christensen, Mette Krogh; Seyer-Hansen, Mikkel

    2014-08-04

    In 2009 surgeons from Aarhus University Hospital founded an extracurricular talent development project based on a skill-acquisition training programme for medical students at Aarhus University. The training program, named Dream Team, provides medical students with the opportunity to pursue a career in surgery. This paper presents and discusses the organizational and pedagogical framework of the concept Dream Team, as well as the results from two inquiries: a survey and an exploratory observational study. The inquiries were conducted in summer 2013.

  3. A Quantitative Study of Global Software Development Teams, Requirements, and Software Projects

    Science.gov (United States)

    Parker, Linda L.

    2016-01-01

    The study explored the relationship between global software development teams, effective software requirements, and stakeholders' perception of successful software development projects within the field of information technology management. It examined the critical relationship between Global Software Development (GSD) teams creating effective…

  4. One more thing: Faculty response to increased emphasis on project teams in undergraduate engineering education

    Science.gov (United States)

    Hunter, Jane

    Tenured and tenure-track faculty members at institutions of higher education, especially those at Research I institutions, are being asked to do more than ever before. With rapidly changing technology, significant decreases in public funding, the shift toward privately funded research, and the ever increasing expectations of students for an education that adequately prepares them for professional careers, engineering faculty are particularly challenged by the escalating demands on their time. In 1996, the primary accreditation organization for engineering programs (ABET) adopted new criteria that required, among other things, engineering programs to teach students to function on multidisciplinary teams and to communicate effectively. In response, most engineering programs utilize project teams as a strategy for teaching these skills. The purpose of this qualitative study of tenured and tenure track engineering faculty at a Research I institution in the southwestern United States was to explore the variety of ways in which the engineering faculty responded to the demands placed upon them as a result of the increased emphasis on project teams in undergraduate engineering education. Social role theory and organizational climate theory guided the study. Some faculty viewed project teams as an opportunity for students to learn important professional skills and to benefit from collaborative learning but many questioned the importance and feasibility of teaching teamwork skills and had concerns about taking time away from other essential fundamental material such as mathematics, basic sciences and engineering sciences. Although the administration of the College of Engineering articulated strong support for the use of project teams in undergraduate education, the prevailing climate did little to promote significant efforts related to effective utilization of project teams. Too often, faculty were unwilling to commit sufficient time or effort to make project teamwork a

  5. Exploring the dynamics of formal and informal networks in complex multi-team development projects

    DEFF Research Database (Denmark)

    Kratzer, J.; Gemuenden, H. G.; Lettl, Christopher

    2007-01-01

    The increasing number of complex multi-team projects and the scarcity of knowledge about how to run them successfully, create a need for systematic empirical studies. We attempt to lessen this empirical gap by examining the overlap and structure of formally ascribed design interfaces and informal...... communication networks between participating teams in two complex multi-team projects in the space industry. We study the two projects longitudinally throughout the design and integration phases of product development. There are three major findings. First, formally ascribed design interfaces and informal...... communication networks overlap only marginally. Second, the structure of informal communication remains largely stable in the transition from the design to the integration phase. The third and most intriguing finding is that the weak overlap between formally ascribed design interfaces and the informal...

  6. Targeting relationally integrated project teams for sustainable PPPs

    OpenAIRE

    Kumaraswamy, M. M.; Ling, F. Y. Y.; Anvuur, A. M.; Rahman, M. M.

    2007-01-01

    Purpose – This paper targets the development of comprehensive approaches to prequalifying teams for Public Private Partnerships (PPPs). Design/methodology/approach – Research outcomes from a study into “relationally integrated project teams” (RIPTs) were applied to necessarily longer-term PPP scenarios. A force field model was developed to visualise the importance of stronger relational forces between the many PPP participants for “sustainable RIPTs” (SRITs). A framework was conceptualised to...

  7. An Empirical Study of Hospitality Management Student Attitudes toward Group Projects: Instructional Factors and Team Problems

    Science.gov (United States)

    Choi, Youngsoo; Ro, Heejung

    2012-01-01

    The development of positive attitudes in team-based work is important in management education. This study investigates hospitality students' attitudes toward group projects by examining instructional factors and team problems. Specifically, we examine how the students' perceptions of project appropriateness, instructors' support, and evaluation…

  8. Team collaborative innovation management based on primary pipes automatic welding project

    International Nuclear Information System (INIS)

    Li Jing; Wang Dong; Zhang Ke

    2012-01-01

    The welding quality of primary pipe directly affects the safe operation of nuclear power plants. Primary pipe automatic welding, first of its kind in China, is a complex systematic project involving many facets, such as design, manufacturing, material, and on-site construction. A R and D team was formed by China Guangdong Nuclear Power Engineering Co., Ltd. (CNPEC) together with other domestic nuclear power design institutes, and manufacturing and construction enterprises. According to the characteristics of nuclear power plant construction, and adopting team collaborative innovation management mode, through project co-ordination, resources allocation and building production, education and research collaborative innovation platform, CNPEC successfully developed the primary pipe automatic welding technique which has been widely applied to the construction of nuclear power plant, creating considerable economic benefits. (authors)

  9. Virtual Teaming and Collaboration Technology: A Study of Influences on Virtual Project Outcomes

    Science.gov (United States)

    Broils, Gary C.

    2014-01-01

    The purpose of this quantitative correlational study was to explore the relationships between the independent variables, contextual factors for virtual teams and collaboration technology, and the dependent variable, virtual project outcomes. The problem leading to the need for the study is a lower success rate for virtual projects compared to…

  10. CERN's IT Consultancy Team: a new IT project support service

    CERN Multimedia

    Ignacio Reguero, IT Department

    2016-01-01

    Newly created IT Consultancy Team provides advice on IT matters to communities at CERN starting new projects or reviewing computing activities of old.   The members of CERN's IT Consultancy Team. The consultants share their knowledge and experience to improve awareness of the IT landscape at CERN and to advise on system architecture and design to ensure best usage of existing IT services and solutions that favour, and are compatible with, the infrastructure already in place. They also help to formalise requirements and assess impact on security, software licenses and cost, especially where contacts among different services are needed and questions go beyond the current computing service offerings. For instance, the IT consultants may help answering questions like the ones below: We are starting with project X – how could we make its computing aspects compatible with the CERN IT infrastructure? E.g. if you need a web content management system favour Drupal instead of Wor...

  11. NORSTAR Project: Norfolk public schools student team for acoustical research

    Science.gov (United States)

    Fortunato, Ronald C.

    1987-01-01

    Development of the NORSTAR (Norfolk Public Student Team for Acoustical Research) Project includes the definition, design, fabrication, testing, analysis, and publishing the results of an acoustical experiment. The student-run program is based on a space flight organization similar to the Viking Project. The experiment will measure the scattering transfer of momentum from a sound field to spheres in a liquid medium. It is hoped that the experimental results will shed light on a difficult physics problem - the difference in scattering cross section (the overall effect of the sound wave scattering) for solid spheres and hollow spheres of differing wall thicknesses.

  12. Adaptation of Agile Project Management Methodology for Project Team

    Directory of Open Access Journals (Sweden)

    Rasnacis Arturs

    2015-12-01

    Full Text Available A project management methodology that defines basic processes, tools, techniques, methods, resources and procedures used to manage a project is necessary for effective and successful IT project management. Each company needs to define its own methodology or adapt some of the existing ones. The purpose of the research is to evaluate the possibilities of adapting IT project development methodology according to the company, company employee characteristics and their mutual relations. The adaptation process will be illustrated with a case study at an IT company in Latvia where the developed methodology is based on Agile Scrum, one of the most widespread Agile methods.

  13. Formal and informal computer mediated communication within within design teams for complex building projects

    NARCIS (Netherlands)

    Otter, den A.F.H.J.; Gray, C.; Prins, M.

    2001-01-01

    In this paper the information environment of design teams is discussed because of the use of Internet based Project websites (PWS) to improve the information exchange within design teams. Because design teams heavenly depend on informal information exchange and PWS is a tool for formalising

  14. Interdisciplinary collaboration within project-level NEPA teams in the US Forest Service

    Science.gov (United States)

    James W. Freeman; Marc J. Stern; Michael Mortimer; Dale J. Blahna; Lee K. Cerveny

    2011-01-01

    Interdisciplinary teamwork has become a foundation of natural resources planning and management in the US. Yet, we know little about the degree of interdisciplinary collaboration of natural resource planning teams. We conducted 10 case studies of Forest Service NEPA (National Environmental Policy Act) teams working on projects related to the 2005 Travel Management Rule...

  15. Crew Resource Management (CRM video storytelling project: a team-based learning activity

    Directory of Open Access Journals (Sweden)

    Ma, Maggie Jiao

    2011-01-01

    Full Text Available This Crew Resource Management (CRM video storytelling project asks students to work in a team (4-5 people per team to create (write and produce a video story. The story should demonstrate lacking and ill practices of CRM knowledge and skills, or positive skills used to create a successful scenario in aviation (e. g. , flight training, commercial aviation, airport management. The activity is composed of two parts: (1 creating a video story of CRM in aviation, and (2 delivering a group presentation. Each tem creates a 5-8 minute long video clip of its story. The story must be originally created by the team to educate pilot and/or aviation management students on good practices of CRM in aviation. Accidents and incidents can be used as a reference to inspire ideas. However, this project is not to re-create any previous CRM accidents/incidents. The video story needs to be self-contained and address two or more aspects of CRM specified in the Federal Aviation Administration’s Advisory Circular 120-51. The presentation must include the use of PowerPoint or similar software and additional multimedia visual aids. The presentation itself will last no more than 17 minutes in length; including the actual video story (each group has additional 3 minutes to set up prior to the presentation. During the presentation following the video each team will discuss the CRM problems (or invite audience to identify CRM problems and explain what CRM practices were performed, and should have been performed. This presentation also should describe how each team worked together in order to complete this project (i. e. , good and bad CRM practiced

  16. Improving patient care through student leadership in team quality improvement projects.

    Science.gov (United States)

    Tschannen, Dana; Aebersold, Michelle; Kocan, Mary Jo; Lundy, Francene; Potempa, Kathleen

    2015-01-01

    In partnership with a major medical center, senior-level nursing students completed a root cause analysis and implementation plan to address a unit-specific quality issue. To evaluate the project, unit leaders were asked their perceptions of the value of the projects and impact on patient care, as well as to provide exemplars depicting how the student root cause analysis work resulted in improved patient outcome and/or unit processes. Liaisons noted benefits of having an RCA team, with positive impact on patient outcomes and care processes.

  17. uCollaborator: Framework for STEM Project Collaboration among Geographically-Dispersed Student/Faculty Teams

    Science.gov (United States)

    Fiore, Stephen M.; Rodriguez, Walter E.; Carstens, Deborah S.

    2012-01-01

    This paper presents a framework for facilitating communication among STEM project teams that are geographically dispersed in synchronous or asynchronous online courses. The framework has been developed to: (a) improve how engineering and technology students and faculty work with collocated and geographically-dispersed teams; and (b) to connect the…

  18. Transformational leadership and project success : The mediating role of team-building

    NARCIS (Netherlands)

    Aga, Deribe Assefa; Noorderhaven, Niels; Vallejo, Bertha

    2016-01-01

    Although the effect of transformational leadership on project success is empirically supported, less is known about the mechanisms that explain this effect. To address this issue, we propose the mediating role of team-building as a possible explanation of the relationship between transformational

  19. Software Engineering Team Project - lessons learned

    Directory of Open Access Journals (Sweden)

    Bogumiła Hnatkowska

    2013-06-01

    Full Text Available In the 2010/11 academic year the Institute of Informatics at Wroclaw University of Technology issued ’Software Engineering Team Project’ as a course being a part of the final exam to earn bachelor’s degree. The main assumption about the course was that it should simulate the real environment (a virtual IT company for its participants. The course was aimed to introduce issues regarding programming in the medium scale, project planning and management. It was a real challenge as the course was offered for more than 140 students. The number of staff members involved in its preparation and performance was more than 15. The paper presents the lessons learned from the first course edition as well as more detailed qualitative and quantitative course assessment.

  20. Balancing creativity and time efficiency in multi-team R&D projects: The alignment of formal and informal networks

    DEFF Research Database (Denmark)

    Kratzer, Jan; Gemuenden, Hans Georg; Lettl, Christopher

    2008-01-01

    and their effect on the challenge to balance project creativity and time efficiency. In order to analyse this issue data in two multi-team R&D projects in space industry are collected. There are two intriguing findings that are partly contradicting the state-of-the art knowledge. First, formally ascribed design...... with the team's creativity, whereas it negatively impacts the team's time efficiency....

  1. Project work on wellbeing in multidisciplinary student teams : A triple testimonial on eps at artesis

    NARCIS (Netherlands)

    Rohaert, S.; Baelus, C.; Lacko, D.

    2012-01-01

    The European Project Semester (EPS) programme offers an educational framework to support students to practice problem-and project-based cross-disciplinary product innovation and research, in small multidisciplinary and international teams. To explore the potential and the restrictions of this

  2. MANAGING LARGE INVESTMENT PROJECTS IN GORJ

    Directory of Open Access Journals (Sweden)

    CÎRNU DORU

    2016-12-01

    Full Text Available Currently, the concept of project management is considered to be the best concept for efficient management of a project, so it is used all over the world, and most recently in our country. This concept is designed with all the general characteristics of project management, but adapted to the large investment projects. This paper presents the project management concept and project management organization for capital projects. This concept is conceived with all general characteristics of project management, but adopted to the condition of large investment projects. The concept also includes the project team and the project manager, the person authorized and responsible for achieving the objectives planned in the project. For efficient managing by project, it is necessary to insure a good compozition of project team, as a team of people who, in collaboration with project manager, work directly on managing the project. To effectively manage the project, it is necessary to ensure a proper composition of the project team, a team of people who, in collaboration with the project manager to work directly for project management. It is a particularly good method of achieving the objectives planned projects, which means a project with a certain level of performance required in a planned time, with planned costs.

  3. Scaffolding Project-Based Learning with the Project Management Body of Knowledge (PMBOK[R])

    Science.gov (United States)

    van Rooij, Shahron Williams

    2009-01-01

    This paper reports the results of a study of the extent to which processes and procedures from the discipline of project management can scaffold online project-based learning in a graduate-level instructional technology course, by facilitating intra-team interaction, enhancing project outcomes and promoting a positive project team experience. With…

  4. Project management in practice : Evaluating a case project through project management theories

    OpenAIRE

    Uusitalo, Jenni

    2013-01-01

    The purpose of this thesis was to evaluate a case project and to study whether it was carried out in a correct manner; meaning that did the case project follow the project management models. In addition, part of the study was to determine what could have been improved in the management of the case project. The case project was about creating and launching a communication channel based on a social media service, on a blog platform called Tumblr, for Team Finland in Spain network. The network p...

  5. Project manager attributes influencing project success in the South ...

    African Journals Online (AJOL)

    success criteria for building projects in Ghana and concluded that the “current and ... qualifications, profession, leadership style and project team ... and expectations of project management competence between ... 1.d. Sense of teamwork ...

  6. Complex approach in telecommunication engineering education: develop engineering skills by a team project

    Directory of Open Access Journals (Sweden)

    Scripcariu Luminița

    2017-01-01

    Full Text Available This paper provides an overview of the educational process of telecommunication engineering students by presenting the preparation of a team project focused on information security. Our educational approach combines basic knowledge such as mathematics with specialized engineering notions and various skills. The project theme is to design, implement and test an encryption algorithm. Students are provided with online courses, specific software programs and Internet access. They have to choose an encryption algorithm, to study its details and to write the script of the encryption algorithm in MATLAB program. The algorithm is implemented in C/C++ programming language and tested. Finally, a concurrent team tries to break the algorithm by finding the decryption key. It is an interactive approach which combines various education methods including gaming concepts. The covered topics provide students professional outcomes such as knowledge and use of specific mathematical tools and software environments (C/C ++ programming languages, MATLAB, abilities to design, develop, implement and test software algorithms. The project also provides transversal outcomes such as ability to team work, skills of computer use and information technology and capability to take responsibilities. Creativity is also encouraged by extending the algorithm to other encryption key lengths than the usual ones.

  7. Student Team Projects in Information Systems Development: Measuring Collective Creative Efficacy

    Science.gov (United States)

    Cheng, Hsiu-Hua; Yang, Heng-Li

    2011-01-01

    For information systems development project student teams, learning how to improve software development processes is an important training. Software process improvement is an outcome of a number of creative behaviours. Social cognitive theory states that the efficacy of judgment influences behaviours. This study explores the impact of three types…

  8. The Competence for Project Team Members in the Conditions of Remote Working

    Directory of Open Access Journals (Sweden)

    Zdonek Iwona

    2017-02-01

    Full Text Available The article presents results of the qualitative research on competence of project team members in the conditions of remote working. These competences were considered in relation to different roles, which the members of such a team accept. The reference point to studied roles was the concept of Hansen and Allen authorships, and with regard to competence, the author's synthesis of deliberations above their models described in the literature.

  9. Project time boxing and milestones as drivers for open design projects

    DEFF Research Database (Denmark)

    Tollestrup, Christian H. T.

    2015-01-01

    is very positive and that the structure, strict enforcement and rolling project management responsibility in a group work setting really helps them drive the project forward with high motivation. The main challenge lies in the balance between loading the teams with too many challenges and just providing......The Curriculums and programs in Problem Based Learning (PBL) utilizes the project-format in a team based setting for rehearsing the competencies of applying the design-oriented skills and knowledge learned in courses and workshops. If the project period is self-organised, there is a tendency......, because of the facilitated format where ‘disturbances’ are eliminated. If successful the state of creative flow is achieved. So how can we create a sense of urgency in longer project periods, not just workshop format, that would help a team of design students to engage and drive the project from the start...

  10. Initial evaluation of the effects of an environmental-focused problem-solving intervention for transition-age young people with developmental disabilities: Project TEAM.

    Science.gov (United States)

    Kramer, Jessica M; Helfrich, Christine; Levin, Melissa; Hwang, I-Ting; Samuel, Preethy S; Carrellas, Ann; Schwartz, Ariel E; Goeva, Aleksandrina; Kolaczyk, Eric D

    2018-03-12

    Project TEAM (Teens making Environment and Activity Modifications) teaches transition-age young people with developmental disabilities, including those with co-occurring intellectual or cognitive disabilities, to identify and resolve environmental barriers to participation. We examined its effects on young people's attainment of participation goals, knowledge, problem-solving, self-determination, and self-efficacy. We used a quasi-experimental, repeated measures design (initial, outcome, 6-week follow-up) with two groups: (1) Project TEAM (28 males, 19 females; mean age 17y 6mo); and (2) goal-setting comparison (21 males, 14 females; mean age 17y 6mo). A matched convenience sample was recruited in two US states. Attainment of participation goals and goal attainment scaling (GAS) T scores were compared at outcome. Differences between groups for all other outcomes were analyzed using linear mixed effects models. At outcome, Project TEAM participants demonstrated greater knowledge (estimated mean difference: 1.82; confidence interval [CI]: 0.90, 2.74) and ability to apply knowledge during participation (GAS: t[75]=4.21; CI: 5.21, 14.57) compared to goal-setting. While both groups achieved significant improvements in knowledge, problem-solving, and self-determination, increases in parent reported self-determination remained at 6-week follow-up only for Project TEAM (estimated mean difference: 4.65; CI: 1.32, 7.98). Significantly more Project TEAM participants attained their participation goals by follow-up (Project TEAM=97.6%, goal-setting=77.1%, p=0.009). Both approaches support attainment of participation goals. Although inconclusive, Project TEAM may uniquely support young people with developmental disabilities to act in a self-determined manner and apply an environmental problem-solving approach over time. Individualized goal-setting, alone or during Project TEAM (Teens making Environment and Activity Modifications) appears to support attainment of participation

  11. Project Leader's Dual Socialization and Its Impact on Team Learning and Performance: A Diagnostic Study

    Science.gov (United States)

    Gautam, Tanvi

    2009-01-01

    One of the important challenges for leadership in project teams is the ability to manage the knowledge, communication and coordination related activities of team. In cross-team collaboration, different boundaries contribute to the situated nature of knowledge and hamper the flow of knowledge and prevent shared understanding with those on the other…

  12. The link class project : Collaborative virtual teams between Peru and The Netherlands

    NARCIS (Netherlands)

    Olivos Rossini, L.M.; Rincon, Sandra; Rutkowski, Anne-Francoise

    2015-01-01

    The Link Class Project presented in this article provides an example of established collaborative group activities to negotiate and build a report together in virtual teams composed of students at Universidad ESAN, Lima (Peru) and Tilburg University, Tilburg (Netherlands). It further analyzes the

  13. Exploring leadership in self-managed project teams in Malaysia

    Directory of Open Access Journals (Sweden)

    Zaleha Yazid

    2015-01-01

    Full Text Available This paper focuses on a longitudinal approach in exploring leadership in Self-Managed Project Teams (SMPT. SMPT has been known to contribute to organizations by improving productivity and increasing organizational performance. Therefore, understanding the dynamics of leadership in this type of team can be seen as one of the important factors to ensure the success of organizations. Leading a team which manages itself is a challenge as increased autonomy and control is given to the team which eliminates the existence of a leader. It is important to understand the extent of how the external leader is involved within SMPT and whether the external leader approaches highlighted in the literature are applicable in such a situation and how these approaches change during work processes. This study comprises of evidence collected through semi-structured interviews in two small and medium sized organizations in Malaysia. Weekly telephone interviews as well as face-to-face interviews were conducted which provides contextual data for the research. In this research, the evidence suggested that SMPT transform from self-managed toward leader-managed resulting from several factors, such as conflict handling strategies. Specifically, it was found that avoiding conflicts, rather than confronting, transform the team into being leader dependent.

  14. Can I Trust You? Profile Elements that Inform First Impressions of Trustworthiness in Virtual Project Teams

    NARCIS (Netherlands)

    Rusman, Ellen; Van Bruggen, Jan; Sloep, Peter; Valcke, Martin; Koper, Rob

    2010-01-01

    Rusman, E., Van Bruggen, J., Sloep, P. B., Valcke, M., & Koper, R. (2012). Can I Trust You? Profile Elements that Inform First Impressions of Trustworthiness in Virtual Project Teams. International Journal of Information Technology Project Management (IJITPM), 3(1), 15-35.

  15. Overlapping Boundaries of the Project Time Management and Project Risk Management

    Directory of Open Access Journals (Sweden)

    Marius PODEAN

    2010-01-01

    Full Text Available Based on utility function, milestones during project and/or the end of projects or programme may be categorized in what are called soft-deadline and hard-deadline. In contrast with the soft-end projects, the hard-end projects posses a decrease of utility function with a vertical asymptote character around the deadline for project completion. In extreme situations, the utility function itself may fall under zero (projects may generate losses to both constructor and customer. Existing risk analysis methodologies observe risks from monetary terms. The typical risks are correlated with an increase in final project costs. In order to estimate harddeadline milestones and/or end of projects or programme is critical to employ the time dimension rather than the typical cost-based risk analysis. Here, we comprehensively describe a structured methodology that focuses on minimizing and mitigating project specific delay risks. The method may supplement existing cost-based risk analysis in projects. We aim to elegantly combine moderation techniques to reveal the intrinsic risk of the projects. In addition to the technical risks, the moderation techniques are able to bring evidence of risks as the team efficacy, diverse un-correlations or miss-understanding about the roles of the team members in the team – most of the project soft risk. Described methodology encourages the common understanding of risks for participants, crystallizing the essence of what can go wrong in complex situations and where the opportunities can be unlocked.

  16. Contribution of Full-Scope Simulator Development Project to the Dissemination of Nuclear Knowledge within New-Build–Project Teams

    International Nuclear Information System (INIS)

    Gain, P.

    2016-01-01

    Full text: In a context where few countries recently carried out nuclear new-build projects combined with very strong need for generation renewal, there exists a major stake for the training of the hundreds of engineers who are involved in the design and commissioning teams of this highly complex industrial facility. The Simulator project, which gives the first opportunity for integration and validation of the whole of the design data, to check their coherence, the good performance with the interface and conformity with the safety and performance requirements, allows a fast and effective competence rise of all the resources involved in its development. In addition, the phased availability of the whole of data generally results in having several phased versions of the simulator. Each can then be deployed in great number for training drills which also will contribute to share in optimal way knowledge on the reference plant design. This contexts of broader use of these training modules and use of simulation in support of the engineering activities lead to their use by many teams with varied profiles; and there too, the simulation technologies are of a remarkable effectiveness to share a common and stable knowledge management. (author

  17. Using Agile Project Management to Enhance the Performance of Instructional Design Teams

    Science.gov (United States)

    Sweeney, David S.; Cifuentes, Lauren

    2010-01-01

    Instructional design models describe in detail methodologies for designing effective instruction. Several widely adopted models include suggestions for managing instructional design projects. However, these suggestions focus on how to manage the instructional design steps rather than the instructional design and development team process. The…

  18. Project team formation support for self-directed learners in social learning networks

    NARCIS (Netherlands)

    Spoelstra, Howard; Van Rosmalen, Peter; Sloep, Peter

    2012-01-01

    Spoelstra, H., Van Rosmalen, P., & Sloep, P. B. (2012). Project team formation support for self-directed learners in social learning networks. In P. Kommers, P. Isaias, & N. Bessis (Eds.), Proceedings of the IADIS International Conference on Web Based Communities and Social Media (ICWBC & SM 2012)

  19. A model for selecting project team members using multicriteria group decision making

    Directory of Open Access Journals (Sweden)

    Luciana Hazin Alencar

    2010-04-01

    Full Text Available Selecting a project team is a complex multi-criteria decision-making problem. For this reason, one appropriate way to tackle such problems involves the use of multi-criteria decision aid methods. However, most of the decisions taken regarding the selection of project teams are made by a group of people. It is this which changes the focus of the problem by moving from one decision-maker (DM to a group of DMs. Analysis needs to be extended in order to consider the preference structure of each individual group member. In this paper, we present a group decision model for project team selection based on a multi-criteria evaluation of the preferences of a client's representatives. It could be applied to any decision problem since it involves a group of decision makers whose preferences diverge little. An application of the model in order to select consultants for a construction project is presented.A seleção da equipe em um projeto é um problema de decisão multicritério. Uma forma apropriada de tratar tais problemas envolve o uso de métodos de apoio multicritério a decisão. Grande parte desses problemas envolve um grupo de decisores. Dessa forma, há uma mudança no foco da decisão de um decisor para um grupo de decisores. A análise deve ser ampliada no intuito de considerar a estrutura de preferência de cada membro do grupo. Nesse artigo, apresentamos um modelo aplicado à seleção de equipe de um projeto baseado na avaliação multicritério das preferências dos representantes do cliente do projeto. Pode ser aplicado a qualquer problema de decisão desde que envolva um grupo de decisores que tenham pequena divergência em relação às suas preferências. Uma aplicação para seleção de parte da equipe de um projeto de construção é apresentada.

  20. Crew Resource Management (CRM) video storytelling project: a team-based learning activity

    OpenAIRE

    Ma, Maggie Jiao; Denando, John

    2011-01-01

    This Crew Resource Management (CRM) video storytelling project asks students to work in a team (4-5 people per team) to create (write and produce) a video story. The story should demonstrate lacking and ill practices of CRM knowledge and skills, or positive skills used to create a successful scenario in aviation (e. g. , flight training, commercial aviation, airport management). The activity is composed of two parts: (1) creating a video story of CRM in aviation, and (2) delivering a group pr...

  1. How Does a Project Manager's Level of Development Influence Conceptualizations of Project Management and the Project Development Environment?

    Science.gov (United States)

    Lynch, Margaret M.

    2013-01-01

    This study explores the meaning project managers (PMs) make of their project environment, how they lead their teams and have incorporate complexity into their project management approach. The exploration of the PM's developmental level and meaning making offers a different angle on the project management and leadership literature. The study…

  2. Low Emissions Alternative Power (LEAP) Project Office Business Team of the Aeropropulsion Research Program Office (ARPO) Org. 0140

    Science.gov (United States)

    Buttler, Jennifer A.

    2004-01-01

    The program for which I am working at this summer is Propulsion and Power/Low Emissions Alternative Power (P&P/LEAP). It invests in a fundamental TRL 1-6 research and technology portfolio that will enable the future of: Alternative fuels and/or alternative propulsion systems, non-combustion (electric) propulsion systems. P&P/LEAP will identify and capitalize on the highest potential concepts generated both internal and external to the Agency. During my 2004 summer at NASA Glenn Research Center, I worked with my mentor Barbara Mader, in the Project Office with the Business Team completing various tasks for the project and personnel. The LEAP project is a highly matrixed organization. The Project Office is responsible for the goals advocacy and dollar (budget) of the LEAP project. The objectives of the LEAP Project are to discover new energy sources and develop unconventional engines and power systems directed towards greatly reduced emissions, enable new vehicle concepts for public mobility, new science missions and national security. The Propulsion and PowerLow Emissions Alternative Power directly supports the environmental, mobility, national security objectives of the Vehicle Systems Program and the Aeronautics Technology Theme. Technology deliverables include the demonstration through integrated ground tests, a constant volume combustor in an engine system, and UAV/small transport aircraft all electric power system. My mentor serves as a key member of the management team for the Aeropropulsion Research Program Office (ARPO). She has represented the office on numerous occasions, and is a member of a number of center-wide panels/teams, such as the Space management Committee and is chair to the Business Process Consolidation Team. She is responsible for the overall coordination of resources for the Propulsion and Power Project - from advocacy to implementation. The goal for my summer at NASA was to document processes and archive program documents from the past

  3. Geospace exploration project: Arase (ERG)

    Science.gov (United States)

    Miyoshi, Y.; Kasaba, Y.; Shinohara, I.; Takashima, T.; Asamura, K.; Matsumoto, H.; Higashio, N.; Mitani, T.; Kasahara, S.; Yokota, S.; Wang, S.; Kazama, Y.; Kasahara, Y.; Yagitani, S.; Matsuoka, A.; Kojima, H.; Katoh, Y.; Shiokawa, K.; Seki, K.; Fujimoto, M.; Ono, T.; ERG project Group

    2017-06-01

    The ERG (Exploration of energization and Radiation in Geospace) is Japanese geospace exploration project. The project focuses on relativistic electron acceleration mechanism of the outer belt and dynamics of space storms in the context of the cross-energy coupling via wave-particle interactions. The project consists of the satellite observation team, the ground-based network observation team, and integrated-data analysis/simulation team. The satellite was launched on December 20 2016 and has been nicknamed, “Arase”. This paper describes overview of the project and future plan for observations.

  4. Designing and Developing an Effective Safety Program for a Student Project Team

    Directory of Open Access Journals (Sweden)

    John Catton

    2018-05-01

    Full Text Available In the workplace, safety must be the first priority of all employers and employees alike. In order to maintain the safety and well-being of their employees, employers must demonstrate due diligence and provide the appropriate safety training to familiarize employees with the hazards within the workplace. Although, a student “project team” is not a business, the work done by students for their respective teams is synonymous with the work done in a place of business and thus requires that similar safety precautions and training be administered to students by their team leads and faculty advisors. They take on the role of supervisors within the team dynamic. Student teams often utilize the guidelines and policies that their universities or colleges have developed in order to build a set of standard operating procedures and safety training modules. These guidelines aid in providing a base for training for the team, however, they are no substitute for training specific to the safety risks associated with the work the team is doing. In order to comply with these requirements, a full analysis of the workplace is required to be completed. A variety of safety analysis techniques need to be applied to define the hazards within the workplace and institute appropriate measures to mitigate them. In this work, a process is developed for establishing a safety training program for a student project team, utilizing systems safety management techniques and the aspect of gamification to produce incentives for students to continue developing their skills. Although, systems safety management is typically applied to the design of active safety components or systems, the techniques for identifying and mitigating hazards can be applied in the same fashion to the workplace. They allow one to analyze their workplace and determine the hazards their employees might encounter, assign appropriate hazard ratings and segregate each respective hazard by their risks. In so

  5. A Path to Successful Energy Retrofits: Early Collaboration through Integrated Project Delivery Teams

    Energy Technology Data Exchange (ETDEWEB)

    Parrish, Kristen [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2012-10-01

    This document guides you through a process for the early design phases of retrofit projects to help you mitigate frustrations commonly experienced by building owners and designers. It outlines the value of forming an integrated project delivery team and developing a communication and information-sharing infrastructure that fosters collaboration. This guide does not present a complete process for designing an energy retrofit for a building. Instead, it focuses on the early design phase tasks related to developing and selecting energy efficiency measures (EEMs) that benefit from collaboration, and highlights the resulting advantages.

  6. Capstone Interdisciplinary Team Project: A Requirement for the MS in Sustainability Degree

    Science.gov (United States)

    Jiji, Latif M.; Schonfeld, Irvin Sam; Smith, George A.

    2015-01-01

    Purpose: This paper aims to describe experience gained with a required six-credit year-long course, the Capstone Interdisciplinary Team Project, a key component of the Master of Science (MS) in Sustainability degree at the City College of New York. A common feature of sustainability problems is their interdisciplinary nature. Solutions to…

  7. Learning Cell Biology as a Team: A Project-Based Approach to Upper-Division Cell Biology

    Science.gov (United States)

    Wright, Robin; Boggs, James

    2002-01-01

    To help students develop successful strategies for learning how to learn and communicate complex information in cell biology, we developed a quarter-long cell biology class based on team projects. Each team researches a particular human disease and presents information about the cellular structure or process affected by the disease, the cellular…

  8. Structural equation modeling analysis of factors influencing architects' trust in project design teams

    Institute of Scientific and Technical Information of China (English)

    DING Zhi-kun; NG Fung-fai; WANG Jia-yuan

    2009-01-01

    This paper describes a structural equation modeling (SEM) analysis of factors influencing architects' trust in project design teams. We undertook a survey of architects, during which we distributed 193 questionnaires in 29 A-level architectural We used Amos 6.0 for SEM to identify significant personal construct based factors affecting interpersonal trust. The results show that only social interaction between architects significantly affects their interpersonal trust. The explained variance of trust is not very high in the model. Therefore, future research should add more factors into the current model. The practical implication is that team managers should promote the social interactions between team members such that the interpersonal trust level between team members can be improved.

  9. Habitat Demonstration Unit Project: Leadership and Management Strategies for a Rapid Prototyping Project

    Science.gov (United States)

    Kennedy, Kriss J.; Toup, Larry; Gill, Tracy; Tri, Terry; Howe, Scott; Smitherman, David

    2011-01-01

    This paper gives an overview of the National Aeronautics and Space Administration (NASA) led multi-center Habitat Demonstration Unit (HDU) project leadership and management strategies being used by the NASA HDU team for a rapid prototyping project. The HDU project team constructed and tested an analog prototype lunar surface habitat/laboratory called the Pressurized Excursion Module (PEM) during 2010. The prototype unit subsystems were integrated in a short amount of time, utilizing a tiger team rapid prototyping approach that brought together over 20 habitation-related technologies and innovations from a variety of NASA centers. This paper describes the leadership and management strategies as well as lessons learned pertaining to leading and managing a multi-center diverse team in a rapid prototype environment. The PEM configuration went from a paper design to an operational surface habitat demonstration unit in less than 12 months. The HDU project is part of the strategic plan from the Exploration Systems Mission Directorate (ESMD) Directorate Integration Office (DIO) and the Exploration Mission Systems Office (EMSO) to test destination elements in analog environments. The 2011 HDU-Deep Space Habitat (DSH) configuration will build upon the PEM work, and emphasize validity of crew operations (remote working and living), EVA operations, mission operations, logistics operations, and science operations that might be required in a deep space context for Near Earth Object (NEO) exploration mission architectures. The 2011 HDU-DSH will be field-tested during the 2011 Desert Research and Technologies Studies (DRaTS) field tests. The HDU project is a "technology-pull" project that integrates technologies and innovations from multiple NASA centers. This project will repurpose the HDU 2010 demo unit that was field tested in the 2010 DRaTS, adding habitation functionality to the prototype unit. This paper will describe the strategy of establishing a multi-center project

  10. One step ahead of technology Cern and HP - an ideal team project

    CERN Multimedia

    Garvey, Kelsey

    2009-01-01

    "In 2004, the It team at Cern recognized the comprehensiveness and future of the LHC Computing Grid Project and realized that the IT infrastructures were not sufficient enough to manage the data. Cern therefore partnered with HP ProCurve the following year to minimize the day-to-day workload and improve infrastructure for data output" (1 page)

  11. The One Plan Project: A cooperative effort of the National Response Team and the Region 6 Regional Response Team to simplify facility emergency response planning

    International Nuclear Information System (INIS)

    Staves, J.; McCormick, K.

    1997-01-01

    The National Response Team (NRT) in coordination with the Region 6 Response Team (RRT) have developed a facility contingency plan format which would integrate all existing regulatory requirements for contingency planning. This format was developed by a multi-agency team, chaired by the USEPA Region 6, in conjunction with various industry, labor, and public interest groups. The impetus for this project came through the USEPA Office of Chemical Emergency Preparedness and Prevention (CEPPO). The current national oil and hazardous material emergency preparedness and response system is an amalgam of federal, state, local, and industrial programs which are often poorly coordinated. In a cooperative effort with the NRT, the CEPPO conducted a Presidential Review of federal agency authorities and coordination responsibilities regarding release prevention, mitigation, and response. Review recommendations led to a Pilot Project in USEPA Region 6. The Region 6 Pilot Project targeted end users in the intensely industrialized Houston Ship Channel (HSC) area, which is comprised of petroleum and petrochemical companies

  12. Project team motyvation

    OpenAIRE

    Jasionis, Dominykas

    2016-01-01

    The term paper is to analyze the formation of the team and its - motyvation, and interviews from four different companies and find out the leaders in terms of your team, and what principle he tries to motivate her. The Tasks of this paper is to review the organization formed by a team; investigate the promotion of employees in enterprises; The four firms interviewed; Assess how you can work in different organizations. Methods used To analyze the topic, I decided to interview four different co...

  13. Identifying Issues in Applying Integrated Project Delivery to Domestic Nuclear Power Plant Construction Projects

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Young Joo [Korean Nuclear Society, Daejeon (Korea, Republic of)

    2016-05-15

    Integrated Project Delivery (IPD) is defined as that people, systems, business structures, and practices of key stakeholders are incorporated into a single-team, with a single process, which executes a project in a way of optimizing the project's outcome, increasing values delivered to the end user, reducing waste, and maximizing efficiency throughout the phases of engineering to construction. The researcher had carried out literature review in terms of IPD to identify major characteristics of IPD which are presented in the following section and had compared such characteristics against peculiarities of nuclear power plant (NPP) construction projects in order to shed light on obstacles in possible application of IPD method to domestic NPP construction projects in the coming days. In this research, three (3) major characteristics of IPD were identified: 1) key stakeholders signing one balanced contract, forming de facto one body, sharing risk and reward 2) an integrated project team being formed in the early stage of a project and providing input to minimize time and cost loss from rework downstream 3) team members co-locating, having open and direct communication, making decisions on time, and pursuing the success of the project itself.

  14. Project management process.

    Science.gov (United States)

    2007-03-01

    This course provides INDOT staff with foundational knowledge and skills in project management principles and methodologies. INDOTs project management processes provide the tools for interdisciplinary teams to efficiently and effectively deliver pr...

  15. Project T.E.A.M. (Technical Education Advancement Modules). Advanced Statistical Process Control.

    Science.gov (United States)

    Dunlap, Dale

    This instructional guide, one of a series developed by the Technical Education Advancement Modules (TEAM) project, is a 20-hour advanced statistical process control (SPC) and quality improvement course designed to develop the following competencies: (1) understanding quality systems; (2) knowing the process; (3) solving quality problems; and (4)…

  16. Learning to Argue with Intermediate Macro Theory: A Semester-Long Team Writing Project

    Science.gov (United States)

    Strasser, Georg; Wolfe, Marketa Halova

    2014-01-01

    The authors describe their experience with integrating a semester-long economic analysis project into an intermediate macroeconomic theory course. Students work in teams of "economic advisors" to write a series of nested reports that analyze the current state of the economy, and propose and evaluate policies for a decision-maker. The…

  17. A Team Formation Framework for Managing Diversity in Multidisciplinary Engineering Project

    Directory of Open Access Journals (Sweden)

    Shawqi Mohammed Hossain

    2017-02-01

    Full Text Available Team formation is one of the essential elements in constructing effective teamwork of any team size that requires different skill sets. Diversity in team encourages students to challenge and compete with one another while searching for new ideas, which in turn can lead to a better team performance. In a well-functioning diverse teams, the students who performed poorly may gain benefit by observing how excellent students approach the assignments. They may also benefit by getting advice and assistance from the excellent students. Studies have shown that Malaysian university graduates lack of team skills. The purpose of this paper is to propose a framework for forming a diverse multidisciplinary team among engineering undergraduates based on selected criteria such as individual personality type, gender, and other relevant demographic information. The proposed framework can also be used to design an automated team-formation system based on the identified metrics. The purpose of the framework is to consolidate the existing team formation literature, and to develop and test interventions for maximizing individual member and team performance as a whole that makes an effective team. For this study, a multidisciplinary approach was used where first year engineering students from three different faculties, namely Faculty of Electrical Engineering (FKE, Faculty of Mechanical Engineering (FKM, and Faculty of Biosciences and Medical Engineering (FBME at Universiti Teknologi Malaysia (UTM worked on an innovation project using the Conceive, Design, Implement, and Operate (CDIO framework. Keirsey Temperament Sorter was used as an instrument to identify an individual's personality type.

  18. SharePoint 2010 for Project Management

    CERN Document Server

    Sy, Dux

    2012-01-01

    If you were to analyze your team's performance on a typical project, you'd be surprised how much time is wasted on non-productive tasks. This hands-on guide shows you how to work more efficiently by organizing and managing projects with SharePoint 2010. You'll learn how to build a Project Management Information System (PMIS), customized to your project, that can effectively coordinate communication and collaboration among team members. Written by a certified Project Management Professional (PMP) and Microsoft SharePoint MVP with 15 years of IT project management experience, each chapter incl

  19. Why good projects fail anyway.

    Science.gov (United States)

    Matta, Nadim F; Ashkenas, Ronald N

    2003-09-01

    Big projects fail at an astonishing rate--more than half the time, by some estimates. It's not hard to understand why. Complicated long-term projects are customarily developed by a series of teams working along parallel tracks. If managers fail to anticipate everything that might fall through the cracks, those tracks will not converge successfully at the end to reach the goal. Take a companywide CRM project. Traditionally, one team might analyze customers, another select the software, a third develop training programs, and so forth. When the project's finally complete, though, it may turn out that the salespeople won't enter in the requisite data because they don't understand why they need to. This very problem has, in fact, derailed many CRM programs at major organizations. There is a way to uncover unanticipated problems while the project is still in development. The key is to inject into the overall plan a series of miniprojects, or "rapid-results initiatives," which each have as their goal a miniature version of the overall goal. In the CRM project, a single team might be charged with increasing the revenues of one sales group in one region by 25% within four months. To reach that goal, team members would have to draw on the work of all the parallel teams. But in just four months, they would discover the salespeople's resistance and probably other unforeseen issues, such as, perhaps, the need to divvy up commissions for joint-selling efforts. The World Bank has used rapid-results initiatives to great effect to keep a sweeping 16-year project on track and deliver visible results years ahead of schedule. In taking an in-depth look at this project, and others, the authors show why this approach is so effective and how the initiatives are managed in conjunction with more traditional project activities.

  20. Project management of radwaste retrofits

    International Nuclear Information System (INIS)

    Vaught, D.L.

    1988-01-01

    Many utilities are finding it necessary to provide additional radioactive waste processing facilities at operating or nearly completed nuclear stations in order to accommodate the ever-changing regulatory, political and socio-economic environment in which we operate. This paper describes the project approach taken at Duke Power Company to provide a comprehensive radioactive waste processing facility at Oconee Nuclear Station. Following a historical perspective, the philosophy and mechanics of the project team are discussed. The goal of the project team was to provide a facility which could meet the liquid and solid radioactive waste processing needs of Oconee within the restraints of a utility budget and schedule. The unique quality of the project team approach was the integral involvement of all of the necessary departments in every part of the design, construction and start-up phases. The project team thereby utilized feedback from over thirty reactor years of operational experience. The remainder of the paper provides examples of the problems encountered and their resolution (eg. equipment layout, materials handling, vendor improvements and regulatory changes all required design-in-progress changes). It has been the integration and concentration of the diverse resources of a large utility into a cross-departmental team which has allowed the timely resolution of the necessary changes. This same philosophy is being applied to the facility start-up program and to other major projects at Duke Power Company

  1. Individual activities as an integrated part of project work - an innovative approach to project oriented and problem-based learning POPBL

    DEFF Research Database (Denmark)

    Moesby, Egon; Winther, Hans Henrik; Kørnøv, Lone

    2006-01-01

    in an individual activity to subsequently be separately assessed. The results of the individually oriented project work form the platform for final work with the project as a team. The students in each team are expected to evaluate the individual solutions and select the one solution to work on in the final phases......In this paper, the authors describe and, on the basis of a recently conducted survey, evaluate a way to increase student learning through the introduction of an individual project activity to the project oriented and problem-based and team-based project work - POPBL. This can be achieved not just...... by adding an individual activity outside or parallel to the project work, but by having the individual activity embedded as an integrated part of the overall team-based project work. In what the authors have deemed the extended project model, students work individually in the solution phase of the project...

  2. Report of the South Texas Project Allegations Review Team. Docket Nos. 50-498 and 50-499, Houston Lighting and Power Company et al.

    Energy Technology Data Exchange (ETDEWEB)

    Kokajko, L.; Skay, D.; Wang, H.; Murphy, D. [Nuclear Regulatory Commission, Washington, DC (United States)

    1995-03-01

    This report provides the results of the South Texas Project Allegations Review Team of the US Nuclear Regulatory Commission. This team was formed to obtain and review allegations from individuals represented by three attorneys who had contacted Congressional staff members. The allegers were employed in various capacities at South Texas Project Electric Generating Station, licensed by Houston Lighting and Power Company, et al.; therefore, the allegations are confined to this site. The South Texas Project Allegations Review Team reviewed, referred, and dispositioned concerns related to discriminatory issues (harassment and intimidation), falsification of records and omission of information, and various technical issues. The team was able to substantiate certain technical issues of minor safety significance or regulatory concern at the South Texas Project facility, but it did not find widespread discriminatory practices such as harassment and intimidation.

  3. Report of the South Texas Project Allegations Review Team. Docket Nos. 50-498 and 50-499, Houston Lighting and Power Company et al

    International Nuclear Information System (INIS)

    Kokajko, L.; Skay, D.; Wang, H.; Murphy, D.

    1995-03-01

    This report provides the results of the South Texas Project Allegations Review Team of the US Nuclear Regulatory Commission. This team was formed to obtain and review allegations from individuals represented by three attorneys who had contacted Congressional staff members. The allegers were employed in various capacities at South Texas Project Electric Generating Station, licensed by Houston Lighting and Power Company, et al.; therefore, the allegations are confined to this site. The South Texas Project Allegations Review Team reviewed, referred, and dispositioned concerns related to discriminatory issues (harassment and intimidation), falsification of records and omission of information, and various technical issues. The team was able to substantiate certain technical issues of minor safety significance or regulatory concern at the South Texas Project facility, but it did not find widespread discriminatory practices such as harassment and intimidation

  4. Balancing creativity and time efficiency in multi-team R&D projects : the alignment of formal and informal networks

    NARCIS (Netherlands)

    Kratzer, Jan; Gemuenden, Hans Georg; Lettl, Christopher

    2008-01-01

    The business world is denoted by an increasing number of multi-team research and development (R&D) projects, however, managerial knowledge about how to run them successfully is scarce. The present study attempts to shed light at this kind of projects by investigating the alignment of formal and

  5. Integrating Public Health and Health Promotion Practice in the Medical Curriculum: A Self-Directed Team-Based Project Approach

    Directory of Open Access Journals (Sweden)

    Geraldine Kershaw

    2017-08-01

    Full Text Available Preparing health professionals in health promotion (HP and disease prevention is essential for improvement of population health, community HP, and better health care for individuals. The aim of this article is to describe an HP project in the form of a major self-directed project-based learning task integrated within the curriculum in the second year of the medical degree program at United Arab Emirates University. The project introduces students to public health and HP practice and develops students’ literature searching, writing, presentation skills, and team work. Students learn the principles underlying behavioral change, and the design of HP programs and materials, through a lecture format. Small groups of students each choose a specific health topic for their project. Over 11 weeks, students obtain information about their topic from appropriate sources (library, PubMed, Google Scholar, credible health sources such as World Health Organization. Using the principles learned in the lectures, they develop appropriate materials for their target audience: for example, posters, a pamphlet, social media content, or a video or radio message. Students seek advice from specialist faculty as needed. In week 12, each team presents their project background, rationale, and materials to their colleagues in a seminar format open to all faculty. They then submit the materials they developed for assessment. Group marks are assigned for presentations and materials. Key concepts are assessed by multiple choice questions in comprehensive course examinations. By participation in the HP project, many students develop a solid background in prevention. The information retrieval, writing, and presentation skills, as well as experience of team work, are valuable both for the remaining years of their training and their future careers.

  6. Managing complex industrial change through projects

    OpenAIRE

    Perotti , Clément; Minel , Stéphanie; Benoit , Roussel; Jean , Renaud

    2010-01-01

    International audience; This paper proposes some elements showing that project is an appropriate way to manage organizational change, and that an individual change occurs during these phases. We suggest that project team should manage individual change in the framework of project for three main reasons. First, being at the crossroad of strategic and operational levels, project team is in the right position in organisation to "translate" organizational change to individuals, and vice-versa. Se...

  7. The Link Class Project: Collaborative virtual teams between Peru and The Netherlands

    OpenAIRE

    Mariella Olivos Rossini; Sandra Rincón; Anne-Francoise Rutkowski

    2015-01-01

    The Link Class Project presented in this article provides an example of established collaborative group activities to negotiate and build a report together in virtual teams composed of students at Universidad ESAN, Lima (Peru) and Tilburg University, Tilburg (Netherlands). It further analyzes the effects of a campus based internationalization strategy supported by the use of technology. Based on previous experiences with virtual classrooms, the authors adhere to the ancient Chinese philosophe...

  8. How to Grow Project Scientists: A Systematic Approach to Developing Project Scientists

    Science.gov (United States)

    Kea, Howard

    2011-01-01

    The Project Manager is one of the key individuals that can determine the success or failure of a project. NASA is fully committed to the training and development of Project Managers across the agency to ensure that highly capable individuals are equipped with the competencies and experience to successfully lead a project. An equally critical position is that of the Project Scientist. The Project Scientist provides the scientific leadership necessary for the scientific success of a project by insuring that the mission meets or exceeds the scientific requirements. Traditionally, NASA Goddard project scientists were appointed and approved by the Center Science Director based on their knowledge, experience, and other qualifications. However the process to obtain the necessary knowledge, skills and abilities was not documented or done in a systematic way. NASA Goddard's current Science Director, Nicholas White saw the need to create a pipeline for developing new projects scientists, and appointed a team to develop a process for training potential project scientists. The team members were Dr. Harley Thronson, Chair, Dr. Howard Kea, Mr. Mark Goldman, DACUM facilitator and the late Dr. Michael VanSteenberg. The DACUM process, an occupational analysis and evaluation system, was used to produce a picture of the project scientist's duties, tasks, knowledge, and skills. The output resulted in a 3-Day introductory course detailing all the required knowledge, skills and abilities a scientist must develop over time to be qualified for selections as a Project Scientist.

  9. Team-Based Learning for Nursing and Medical Students: Focus Group Results From an Interprofessional Education Project.

    Science.gov (United States)

    Feather, Rebecca A; Carr, Doug E; Reising, Deanna L; Garletts, Derrick M

    2016-01-01

    Past research indicates that inadequacies in health care delivery create substantial preventable quality issues that can be addressed through improving relationships among clinicians to decrease the negative effects on patient outcomes. The purpose of this article is to describe the implementation of an interprofessional education project with senior nursing and third-year medical students working in teams in a clinical setting. Results include data from focus groups conducted at the conclusion of the project.

  10. Librarians as Part of Cross-Disciplinary, Multi-Institutional Team Projects: Experiences from the VIVO Collaboration

    Science.gov (United States)

    Garcia-Milian, Rolando; Norton, Hannah F.; Auten, Beth; Davis, Valrie I.; Holmes, Kristi L.; Johnson, Margeaux; Tennant, Michele R.

    2013-01-01

    Cross-disciplinary, team-based collaboration is essential for addressing today’s complex research questions, and librarians are increasingly entering into such collaborations. This study identifies skills needed as librarians integrate into cross-disciplinary teams, based on the experiences of librarians involved in the development and implementation of VIVO, a research discovery and collaboration platform. Participants discussed the challenges, skills gained, and lessons learned throughout the project. Their responses were analyzed in the light of the science of team science literature, and factors affecting collaboration on the VIVO team were identified. Skills in inclusive thinking, communication, perseverance, adaptability, and leadership were found to be essential. PMID:23833333

  11. SAT project introduction: management issues

    International Nuclear Information System (INIS)

    Kazennov, A.Yu.

    1998-01-01

    Management issues of introducing SAT Project include main objectives and expectations; SAT goal and management; major phases of SAT implementation; project quality assurance; SAT based training system and procedures; role of the project team qualifications

  12. Brokerage by a Project Manager across a New Product Development Project

    DEFF Research Database (Denmark)

    Jepsen, Lisbeth Brøde; Jepsen, Anna Lund; Dietrich, Perttu

    2012-01-01

    between three subtypes of brokerage: Brokerage connecting actors from the project team with actors from the various departments within the same organization (intra-organizational brokerage), brokerage connecting employees at the NPD organization with someone working in another organization (inter...... as a hub between possible suppliers for the project. We had also expected that the PM would be more involved in coordination of, to and from the project team than what we found in this study. Based on the study, it seems that some of the connections that we, based on existing knowledge, would expect...... that the management of the project in terms of linking the stakeholders takes off in the solution development phase rather than in the concept development phase which is the phase in focus in large parts of the research that has taken place in this field. Further, contrary to expectations based on existing knowledge...

  13. Formation of the Project Team on Introduction of Financial Controlling into Banking Activity

    Directory of Open Access Journals (Sweden)

    Chmutova Iryna M.

    2014-01-01

    Full Text Available The article identifies order and content of stages of formation of the project team of introduction of financial controlling into banking activity. It offers a procedure of identification of the qualitative team composition, which envisages selection of candidates with the use of rules of fuzzy logical conclusion for assessing three groups of competences: personal (initiative, communication ability, creative ability, purposefulness and responsibility; common managerial (ability to work in a team, ability to manage conflicts, ability to manage, strategic thinking ability, ability to plan team work and distribute rights and obligations and co-ordinate work; special managerial (ability to justify and make decisions under conditions of uncertainty and dynamism, analytical abilities, ability to master new directions and methods of work and use them, skills and ability to form justified recommendations, special knowledge – theoretical grounds and recommendations of modern science with respect to introduction of controlling.

  14. Energy Efficiency Performance in Refurbishment Projects with Design Team Attributes As A Mediator: A Pilot Study

    Science.gov (United States)

    Sekak, Siti Nor Azniza Ahmad; Rahmat Dr, Ismail, Prof.; Yunus, Julitta; Saád, Sri Rahayu Mohd; Hanafi Azman Ong, Mohd

    2017-12-01

    The Energy Efficiency (EE) plays an important role over the building life cycle and the implementation of EE in refurbishment projects has a significant potential towards the reduction of greenhouse gas emissions. However, the involvement of the design team at the early stage of the refurbishment projects will determine the success of EE implementations. Thus, a pilot study was conducted at the initial stage of the data collection process of this research to validate and verify the questionnaires.

  15. Learning from project experiences using a legacy-based approach

    Science.gov (United States)

    Cooper, Lynne P.; Majchrzak, Ann; Faraj, Samer

    2005-01-01

    As project teams become used more widely, the question of how to capitalize on the knowledge learned in project teams remains an open issue. Using previous research on shared cognition in groups, an approach to promoting post-project learning was developed. This Legacy Review concept was tested on four in tact project teams. The results from those test sessions were used to develop a model of team learning via group cognitive processes. The model and supporting propositions are presented.

  16. A Simplified Model of Human Alcohol Metabolism That Integrates Biotechnology and Human Health into a Mass Balance Team Project

    Science.gov (United States)

    Yang, Allen H. J.; Dimiduk, Kathryn; Daniel, Susan

    2011-01-01

    We present a simplified human alcohol metabolism model for a mass balance team project. Students explore aspects of engineering in biotechnology: designing/modeling biological systems, testing the design/model, evaluating new conditions, and exploring cutting-edge "lab-on-a-chip" research. This project highlights chemical engineering's impact on…

  17. The communication in industrialised building system (IBS) construction project: Virtual environment

    Science.gov (United States)

    Pozin, Mohd Affendi Ahmad; Nawi, Mohd Nasrun Mohd

    2017-10-01

    Large portion of numbers team organization in the IBS construction sector is known are being fragmented. That is contributed from a segregation of construction activity thus create team working in virtually. Virtual team are the nature when teams are working in distributed area, across culture and time. Therefore, teams can be respond to the task without relocating to the site project and settle down a problem through information and communication technology (ICT). The emergence of virtual team are carry out by advancements in communication technologies as a medium to improve project team communication in project delivery process on IBS construction. Based on literature review from previous study and data collected from interviewing, this paper aim to identified communication challenges among project team members according to current project development practices in IBS construction project. Hence, in attempt to develop effective communication through the advantages of virtual team approach for IBS construction project. In order to ensure the data is gathered comprehensively and accurately, the data was collected from project managers by using semi structured interview method. It was found that virtual team approach could be enable competitive challenges on complexity in the construction project management process.

  18. Project Hanford management contract quality improvement project management plan; TOPICAL

    International Nuclear Information System (INIS)

    ADAMS, D.E.

    1999-01-01

    On July 13, 1998, the U.S. Department of Energy, Richland Operations Office (DOE-RL) Manager transmitted a letter to Fluor Daniel Hanford, Inc. (FDH) describing several DOE-RL identified failed opportunities for FDH to improve the Quality Assurance (QA) Program and its implementation. In addition, DOE-RL identified specific Quality Program performance deficiencies. FDH was requested to establish a periodic reporting mechanism for the corrective action program. In a July 17, 1998 response to DOE-RL, FDH agreed with the DOE concerns and committed to perform a comprehensive review of the Project Hanford Management Contract (PHMC) QA Program during July and August, 1998. As a result, the Project Hanford Management Contract Quality Improvement Plan (QIP) (FDH-3508) was issued on October 21, 1998. The plan identified corrective actions based upon the results of an in-depth Quality Program Assessment. Immediately following the scheduled October 22, 1998, DOE Office of Enforcement and Investigation (EH-10) Enforcement Conference, FDH initiated efforts to effectively implement the QIP corrective actions. A Quality Improvement Project (QI Project) leadership team was assembled to prepare a Project Management Plan for this project. The management plan was specifically designed to engage a core team and the support of representatives from FDH and the major subcontractors (MSCs) to implement the QIP initiatives; identify, correct, and provide feedback as to the root cause for deficiency; and close out the corrective actions. The QI Project will manage and communicate progress of the process

  19. Scrum Project Management

    CERN Document Server

    Pries, Kim H

    2010-01-01

    Scrum, which was originally invented solely for software development, can now be applied to all types of projects. This book shows project managers how to implement Scrum by explaining the artifacts, rituals, and roles used. The text provides Scrum planning methods to control project scope and schedule as well as Scrum tracking methods to focus teams on improving throughput and streamlining communications. The authors show how to combine traditional project methods with Scrum and how to adapt the familiar work breakdown structure to create Scrum backlogs and sprints. They also demonstrate how

  20. Disruption of Information Technology Projects: The Reactive Decoupling of Project Management Methodologies

    Science.gov (United States)

    Schmitz, Kurt W.

    2013-01-01

    Information Technology projects have migrated toward two dominant Project Management (PM) methodologies. Plan-driven practices provide organizational control through highly structured plans, schedules, and specifications that facilitate oversight by hierarchical bureaucracies. In contrast, agile practices emphasize empowered teams using flexible…

  1. Prioritising Project Scope Definition Elements in Public Building Projects

    Directory of Open Access Journals (Sweden)

    Mohammed K Fageha

    2014-09-01

    Full Text Available A complete definition of the scope of a project upfront during early stages ensures smooth and successful implementation during the project execution. This research identifies and prioritises project scope definition elements for public buildings in Saudi Arabia. Elements that could significantly contribute to complete project scope definition package at pre-project planning stage are identified and their interrelationship determined and prioritised. Using the Project Definition Rating Index (PDRI as a basis, the study uses analytical network process (ANP technique based on data obtained from project managers who have been involved in public sector projects in Saudi Arabia. Data collection and analysis was conducted in three steps. The first step involved identification of scope definition elements while the second involved an investigation into interrelationships among the elements. In the third step, ANP was used to determine the weight of the elements’ importance in terms of contribution to project scope definition completeness. Finally, Pareto analysis was used to prioritise and assess the distribution pattern of the elements. The outcome from this research is the prioritisation of project scope definition elements for public building projects in Saudi Arabia. The prioritised list developed indicates the importance of project scope definition elements. It should help project management teams identify elements to consider when evaluating project scope definition for completeness at the pre-project planning stage. Keywords: Project scope definition, pre-project planning, prioritising, public building projects, Saudi Arabia, Analytical Network Process (ANP

  2. Project Management with IT Security Focus

    OpenAIRE

    Felician Alecu; Paul Pocatilu; Sergiu Capisizu

    2011-01-01

    The paper focus on the main key points related to the IT security project management. The most important lifecycle stages are identified: IT security project proposal definition, project organization, project planning, quality planning, project team organization, IT security project activities management and project closing. The most important success factors for IT security projects are the support of top-management, customer satisfaction, prevention over remediation and continuous progress....

  3. Project T.E.A.M. (Technical Education Advancement Modules). Introduction to Statistical Process Control.

    Science.gov (United States)

    Billings, Paul H.

    This instructional guide, one of a series developed by the Technical Education Advancement Modules (TEAM) project, is a 6-hour introductory module on statistical process control (SPC), designed to develop competencies in the following skill areas: (1) identification of the three classes of SPC use; (2) understanding a process and how it works; (3)…

  4. ORGANIZATIONAL PROJECT MANAGEMENT MATURITY

    Directory of Open Access Journals (Sweden)

    Yana Derenskaya

    2017-11-01

    Full Text Available The present article is aimed at developing a set of recommendations for achieving a higher level of organizational project maturity at a given enterprise. Methodology. For the purposes of the current research, the available information sources on the components of project management system are analysed; the essence of “organizational maturity” and the existing models of organizational maturity are studied. The method of systemic and structural analysis, as well as the method of logical generalization, are employed in order to study the existing models of organizational maturity, to describe levels of organizational maturity, and finally to develop a set of methodological recommendations for achieving a higher level of organizational project maturity at a given enterprise. The results of the research showed that the core elements of project management system are methodological, organizational, programtechnical, and motivational components. Project management encompasses a wide range of issues connected with organizational structure, project team, communication management, project participants, etc. However, the fundamental basis for developing project management concept within a given enterprise starts with defining its level of organizational maturity. The present paper describes various models of organizational maturity (staged, continuous, petal-shaped and their common types (H. Кеrzner Organizational Maturity Model, Berkeley PM Maturity Model, Organizational Project Management Maturity Model, Portfolio, Program & Project Management Maturity Model. The analysis of available theoretic works showed that the notion “organizational project maturity” refers to the capability of an enterprise to select projects and manage them with the intention of achieving its strategic goals in the most effective way. Importantly, the level of maturity can be improved by means of formalizing the acquired knowledge, regulating project-related activities

  5. White Paper on the Use of Team Calendars with the JIRA Issue Tracking System and Confluence Collaboration Tools for the xLPR Project

    Energy Technology Data Exchange (ETDEWEB)

    Klasky, Hilda B. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Williams, Paul T. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Bass, Bennett Richard [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2012-09-01

    ORNL was tasked by xLPR project management to propose a team calendar for use within the xLPR consortium. Among various options that were considered, the approach judged by ORNL to best fit the needs of the xLPR project is presented in this document. The Atlassian Team Calendars plug-in used with the Confluence collaboration tool was recommended for several reasons, including the advantage that it provides for a tight integration between Confluence (found at https://xlpr.ornl.gov/wiki ) and xLPR s JIRA issue tracking system (found at https://xlpr.ornl.gov/jira ). This document is divided into two parts. The first part (Sections 1-6) consists of the white paper, which highlights some of the ways that Team Calendars can improve com mun ication between xLPR project managers, group leads, and team members when JIRA is applied for both issue tracking and change-management activities. Specific points emphasized herein are as follows: The Team Calendar application greatly enhances the added value that the JIRA and Confluence tools bring to the xLPR Project. The Team Calendar can improve com mun ication between xLPR project managers, group leads, and team members when JIRA is applied for both issue tracking and change-management activities. The Team Calendar works across different email tools such as Outlook 2011, Outlook 2010, Outlook 2007, Google Calendars and Mac s iCalendar to name a few. xLPR users can now access the wiki Confluence (with embedded Team Calendars) directly from JIRA without having to re-validate their login. The second part consists of an Annex (Section 7), which describes how users can subscribe to Team Calendars from different calendar applications. Specific instructions are given in the Annex that describe how to Import xLPR Team Calendar to Outlook Version Office 2010 Import xLPR Team Calendar to Outlook Version Office 2007 Subscribe to Team Calendar from Google Calendar The reader is directed to Section 4 for instructions on adding events to the

  6. Improving Scientific Research Methodology in Undergraduate Medical Students: a case of team based training blended in a research project

    Institute of Scientific and Technical Information of China (English)

    W.Zhang; C.Cambier; Y.Zhang; J.M.Vandeweerd; P.Gustin

    2014-01-01

    An educational intervention targeting medical students and aiming to develop skills useful to the writing of a health science research protocol over a short period of time has been developed in the Shanghai Jiao Tong University School of Medicine. The methodology blending the principles of PBL and TBL is detailed and key issues of this implementation are discussed. Twenty-one students were enrolled in a research master degree and participated to three mandatory 180-minutes sessions. Beyond classical skills useful to solve a problem, this new intervention focused on the transformation of knowledge to create an authentic content, which is a feature of the project-based learning(PBL). The training process was designed according to team-based learning(TBL) procedure except that work sharing between groups and pooling resources and outcomes of each group allowed the construction of one final class original research project in the field of respiratory pharmacology. The combination of both learning methods allowed promoting individual and group accountability necessary to improve self-learning and the quality of the final joint project. The peer reviewing was an essential factor in creating the students’ motivation and improving of team discussion. The grades individually assigned for skills and quality of the project by an external teacher suggested that key objectives of the intervention were reached. In conclusion, the educational intervention described in this paper appears as an appropriate method to develop specific skills necessary to write and discuss a research project within a research team.Further works are necessary to measure the degree of satisfaction of students and improvement of performance.

  7. Managing Projects with KPRO

    Science.gov (United States)

    Braden, Barry M.

    2004-01-01

    How does a Project Management Office provide: Consistent, familiar, easily used scheduling tools to Project Managers and project team members? Provide a complete list of organization resources available for use on the project? Facilitate resource tracking and visibility? Provide the myriad reports that the organization requires? Facilitate consistent budget planning and cost performance information? Provide all of this to the entire organization? Provide for the unique requirement of the organization? and get people to use it? Answer: Implementation of the Kennedy space Center Projects and Resources Online (KPRO), a modified COTS solution.

  8. Project Bibliographies: Tracking the Expansion of Knowledge Using JPL Project Publications

    Science.gov (United States)

    Coppin, Ann

    2016-01-01

    The Jet Propulsion Laboratory (JPL) Library defines a project bibliography as a bibliography of publicly available publications relating to a specific JPL instrument or mission. These bibliographies may be used to share information between distant project team members, as part of the required Education and Public Outreach effort, or as part of…

  9. Management systems for environmental restoration projects

    International Nuclear Information System (INIS)

    Harbert, R.R.

    1990-01-01

    This paper reports that the success fo large environmental restoration projects depends on sound management systems to guide the team of organizations and individuals responsible for the project. Public concern about and scrutiny of these environmental projects increase the stakes for those involved in the management of projects. The Department of Energy (DOE) Formerly Utilized Sites Remedial Action Program (FUSRAP) uses a system approach to performing and improving the work necessary to meet FUSRAP objectives. This approach to preforming and improving the work necessary to meet FUSRAP objectives. This approach is based upon management criteria embodied in DOE cost and schedule control system and the quality assurance requirements. The project team used complementary criteria to develop a system of related parts and processes working together to accomplish the goals of the project

  10. Successful project management

    CERN Document Server

    Young, Trevor L

    2016-01-01

    Successful Project Management, 5th edition, is an essential guide for anyone who wants to improve the success rate of their projects. It will help managers to maintain a balance between the demands of the customer, the project, the team and the organization. Covering the more technical aspects of a project from start to completion it contains practised and tested techniques, covering project conception and start-up, how to manage stake holders, effective risk management, project planning and launch and execution. Also including a brand new glossary of key terms, it provides help with evaluating your project as well as practical checklists and templates to ensure success for any ambitious project manager. With over one million copies sold, the hugely popular Creating Success series covers a wide variety of topic, with the latest editions including new chapters such as Tough Conversations and Treating People Right. This indispensable business skills collection is suited to a variety of roles, from someone look...

  11. Web Based Project Management System

    OpenAIRE

    Aadamsoo, Anne-Mai

    2010-01-01

    To increase an efficiency of a product, nowadays many web development companies are using different project management systems. A company may run a number of projects at a time, and requires input from a number of individuals, or teams for a multi level development plan, whereby a good project management system is needed. Project management systems represent a rapidly growing technology in IT industry. As the number of users, who utilize project management applications continues to grow, w...

  12. Fundamentals of Project Management

    CERN Document Server

    Heagney, Joseph

    2011-01-01

    With sales of more than 160,000 copies, Fundamentals of Project Management has helped generations of project managers navigate the ins and outs of every aspect of this complex discipline. Using a simple step-by-step approach, the book is the perfect introduction to project management tools, techniques, and concepts. Readers will learn how to: ò Develop a mission statement, vision, goals, and objectives ò Plan the project ò Create the work breakdown structure ò Produce a workable schedule ò Understand earned value analysis ò Manage a project team ò Control and evaluate progress at every stage.

  13. Visualizations as Projection Devices

    DEFF Research Database (Denmark)

    Harty, Chris; Holm Jacobsen, Peter; Tryggestad, Kjell

    The aim of this paper is to inquire into the role of project visualizations in shaping healthcare spaces and practices. The study draws upon an ethnographic field study from a large on-going hospital construction project in Denmark, and focuses on the early phases of on-boarding the design team...... into the project organization. During the on-boarding visualizations multiplies in form, content and purpose, ranging from paper and digitally based projections of clinical work spaces and practices for the future hospital building in use, to paper and digitally based projections of the cost budget and time...

  14. HBR guide to project management

    CERN Document Server

    Harvard Business Review

    2013-01-01

    MEET YOUR GOALS—ON TIME AND ON BUDGET. How do you rein in the scope of your project when you’ve got a group of demanding stakeholders breathing down your neck? And map out a schedule everyone can stick to? And motivate team members who have competing demands on their time and attention? Whether you’re managing your first project or just tired of improvising, this guide will give you the tools and confidence you need to define smart goals, meet them, and capture lessons learned so future projects go even more smoothly. The HBR Guide to Project Management will help you: • Build a strong, focused team • Break major objectives into manageable tasks • Create a schedule that keeps all the moving parts under control • Monitor progress toward your goals • Manage stakeholders’ expectations • Wrap up your project and gauge its success

  15. Managing Complex Distance Education Projects in a Telework Environment

    Science.gov (United States)

    Ally, Mohamed; Cleveland-Innes, Marti; Wiseman, Colin

    2010-01-01

    The advances of communication technologies have allowed professionals to work on distance education projects in a telework environment. Managers of these projects must have the skills to manage the projects from a distance. They must be able to select the appropriate team members to work on the project, orient team members, and monitor team…

  16. Final ITER CTA project board meeting

    International Nuclear Information System (INIS)

    Vlasenkov, V.

    2003-01-01

    The final ITER CTA Project Board Meeting (PB) took place in Barcelona, Spain on 8 December 2002. The PB took notes of the comments concerning the status of the International Team and the Participants Teams, including Dr. Aymar's report 'From ITER to a FUSION Power Reactor' and the assessment of the ITER project cost estimate

  17. Understanding Pre-Quantitative Risk in Projects

    Science.gov (United States)

    Cooper, Lynne P.

    2011-01-01

    Standard approaches to risk management in projects depend on the ability of teams to identify risks and quantify the probabilities and consequences of these risks (e.g., the 5 x 5 risk matrix). However, long before quantification does - or even can - occur, and long after, teams make decisions based on their pre-quantitative understanding of risk. These decisions can have long-lasting impacts on the project. While significant research has looked at the process of how to quantify risk, our understanding of how teams conceive of and manage pre-quantitative risk is lacking. This paper introduces the concept of pre-quantitative risk and discusses the implications of addressing pre-quantitative risk in projects.

  18. PROJECT MANAGER SKILLS, RISK MANAGEMENT TOOLS

    Directory of Open Access Journals (Sweden)

    Vladut Iacob

    2013-12-01

    Full Text Available Although the projects are different from each other there are many common things that contribute to their success. Looked overall, the success of a project is the result of a multitude of factors. This person is considered the "engine" of the project. The man who makes the action set for the achievement of project objectives to be brought to an end. The project manager must have the technical knowledge and economic diverse. He should be able to choose a team and lead. You must be tenacious, combative, to know how to communicate both within the team and beyond. In a word, the project manager must have an impressive stock of knowledge, skills and abilities and appreciate as Peter Drucker, to "exist for the organization. To be its servant. Any management who forget this will only cause damage to the organization. "This study will focus on highlighting the skills of the project manager and their role in managing difficult situations or risk.

  19. The Undergraduate Student Instrument Project (USIP) - building the STEM workforce by providing exciting, multi-disciplinary, student-led suborbital flight projects.

    Science.gov (United States)

    Dingwall, B. J.

    2015-12-01

    NASA's Science Mission Directorate (SMD) recognizes that suborbital carriers play a vital role in training our country's future science and technology leaders. SMD created the Undergraduate Student Instrument Project (USIP) to offer students the opportunity to design, build, and fly instruments on NASA's unique suborbital research platforms. This paper explores the projects, the impact, and the lessons learned of USIP. USIP required undergraduate teams to design, build, and fly a scientific instrument in 18 months or less. Students were required to form collaborative multidisciplinary teams to design, develop and build their instrument. Teams quickly learned that success required skills often overlooked in an academic environment. Teams quickly learned to share technical information in a clear and concise manner that could be understood by other disciplines. The aggressive schedule required team members to hold each other accountable for progress while maintaining team unity. Unanticipated problems and technical issues led students to a deeper understanding of the need for schedule and cost reserves. Students exited the program with a far deeper understanding of project management and team dynamics. Through the process of designing and building an instrument that will enable new research transforms students from textbook learners to developers of new knowledge. The initial USIP project funded 10 undergraduate teams that flew a broad range of scientific instruments on scientific balloons, sounding rockets, commercial rockets and aircraft. Students were required to prepare for and conduct the major reviews that are an integral part of systems development. Each project conducted a Preliminary Design Review, Critical Design Review and Mission Readiness review for NASA officials and flight platform providers. By preparing and presenting their designs to technical experts, the students developed a deeper understanding of the technical and programmatic project pieces that

  20. The IT project manager competencies that impact project success – A qualitative research

    Directory of Open Access Journals (Sweden)

    Cíntia Cristina Silva de Araújo

    2015-07-01

    Full Text Available Since there is a lack of studies about the relationship of IT project manager competencies and project success, this paper will address the following research question: Which competencies should IT project managers develop in order to achieve success in IT projects? To answer this question, we conducted a qualitative research with an exploratory approach. To collect data, twelve (12 in-depth interviews were done with Brazilian project managers from different companies from several business sectors. The analysis results pointed out that for our respondents the most needed category of competencies are team management, business domain knowledge,  communication, project management and people skills. As other authors have affirmed, technical skills were considered to be less relevant to project success than interpersonal and intrapersonal competencies.

  1. Cultural differences in Research project management

    Science.gov (United States)

    Barbier, Michele

    2016-04-01

    Scientific Projects today have increased in complexity, requiring multidisciplinarity, and requiring a mix of diverse individuals from different countries who must be integrated into an effective project. Effective team building is one of the prime responsibilities of the project manager. When the project is supported by a funding, the integration and the implication of the different partners are quite easy. Particularly when partners are developing high-performing teams. However, management of research project requires further skills when the budget is not very high and/or when partners are from non-European countries and are not using the same vocabulary. The various cultures, values, beliefs and social usages, particularly with Mediterranean countries cause a special style of communication for an individual or group of individuals. This communication style participates in the success of the project and encompasses a lot of diplomatic skills which will be highlighted.

  2. PROJECTIZING AN OPERATING NUCLEAR FACILITY

    International Nuclear Information System (INIS)

    Adams, N

    2007-01-01

    This paper will discuss the evolution of an operations-based organization to a project-based organization to facilitate successful deactivation of a major nuclear facility. It will describe the plan used for scope definition, staff reorganization, method estimation, baseline schedule development, project management training, and results of this transformation. It is a story of leadership and teamwork, pride and success. Workers at the Savannah River Site's (SRS) F Canyon Complex (FCC) started with a challenge--take all the hazardous byproducts from nearly 50 years of operations in a major, first-of-its-kind nuclear complex and safely get rid of them, leaving the facility cold, dark, dry and ready for whatever end state is ultimately determined by the United States Department of Energy (DOE). And do it in four years, with a constantly changing workforce and steadily declining funding. The goal was to reduce the overall operating staff by 93% and budget by 94%. The facilities, F Canyon and its adjoined sister, FB Line, are located at SRS, a 310-square-mile nuclear reservation near Aiken, S.C., owned by DOE and managed by Washington Group International subsidiary Washington Savannah River Company (WSRC). These facilities were supported by more than 50 surrounding buildings, whose purpose was to provide support services during operations. The radiological, chemical and industrial hazards inventory in the old buildings was significant. The historical mission at F Canyon was to extract plutonium-239 and uranium-238 from irradiated spent nuclear fuel through chemical processing. FB Line's mission included conversion of plutonium solutions into metal, characterization, stabilization and packaging, and storage of both metal and oxide forms. The plutonium metal was sent to another DOE site for use in weapons. Deactivation in F Canyon began when chemical separations activities were completed in 2002, and a cross-functional project team concept was implemented to successfully

  3. SELECTING WORKING TEAMS FOR INFORMATION TECHNOLOGY OUTSOURCING PROJECTS THROUGH A COMBINATION OF METHODOLOGIES

    Directory of Open Access Journals (Sweden)

    María Alejandra Castellini

    Full Text Available ABSTRACT This paper deals with a problem that Information Technology outsourcing suppliers generally face when selecting a working team technically capable for specific roles in software development projects. A combination of methodologies, interactively integrated, is proposed. They are Soft System Methodology to structure the problem, Repertory Grid for individual interviews and elicitation of the selection criteria, DRV Processes to assess the candidates and to generate knowledge and consensus on the selection process and Linear Programming to assign people to each position. This multimethodology allowed finding a more comprehensive solution than that initially requested by the company, since it helped to establish the necessary transformations for the selection model to operate in the right way, set the competencies to be considered as selection criteria, develop a consensus estimate of the weighted criteria, and award global values to candidates, optimizing the assignment of roles in the group for the project.

  4. METHOD FOR SELECTION OF PROJECT MANAGEMENT APPROACH BASED ON FUZZY CONCEPTS

    Directory of Open Access Journals (Sweden)

    Igor V. KONONENKO

    2017-03-01

    Full Text Available Literature analysis of works that devoted to research of the selection a project management approach and development of effective methods for this problem solution is given. Mathematical model and method for selection of project management approach with fuzzy concepts of applicability of existing approaches are proposed. The selection is made of such approaches as the PMBOK Guide, the ISO21500 standard, the PRINCE2 methodology, the SWEBOK Guide, agile methodologies Scrum, XP, and Kanban. The number of project parameters which have a great impact on the result of the selection and measure of their impact is determined. Project parameters relate to information about the project, team, communication, critical project risks. They include the number of people involved in the project, the customer's experience with this project team, the project team's experience in this field, the project team's understanding of requirements, adapting ability, initiative, and others. The suggested method is considered on the example of its application for selection a project management approach to software development project.

  5. Using project management techniques in hydro-relicensing

    International Nuclear Information System (INIS)

    Dominie, D.; Richard, J.

    1991-01-01

    This paper reports that to answer a pressing need for managing today's complex process and requirements of hydro relicensing, Central Maine Power Company has applied the principles of project management, including the use of computerized scheduling to its hydro relicensing efforts. This approach involves early inter-departmental cooperation in mapping out critical path scheduling by requiring the project team to: Outline the scope of the project in its entirety. Clarify and define components of the project. Quantify and categorize assumptions and dependencies. Identify constraints. The computer-generated schedule of this cooperative planning effort provides a graphic representation of the team's plan and become the focal point for refinements and adjustments necessary to complete an application on time. The use of project management techniques facilities team understanding of the realities and limitations in the relicensing process. These techniques encourage cooperative action, and use a solution-oriented process resulting in a product which can be a useful tool in communicating with resource agencies and regulators

  6. Online Project Management for Dynamic e-Collaboration

    Directory of Open Access Journals (Sweden)

    Lucia RUSU

    2010-01-01

    Full Text Available Today's collaborative projects demand efficient and productive software application tools for the workplace that will bring remote teams together to get the work done. Dynamic e-collaboration is a necessity for virtual relations and business agreements. It depends on two distinct factors: trust and need. This paper presents a way to manage remote teams using a web application developed with ColMap model of project management in an IT company. The information exposed and shared applications with partners in collaborative projects are based on RBAC. Group collaboration and management software has been proven to successfully manage and coordinate projects.

  7. ELECTRICAL SAFETY IMPROVEMENT PROJECT A COMPLEX WIDE TEAMING INITIATIVE

    Energy Technology Data Exchange (ETDEWEB)

    GRAY BJ

    2007-11-26

    This paper describes the results of a year-long project, sponsored by the Energy Facility Contractors Group (EFCOG) and designed to improve overall electrical safety performance throughout Department of Energy (DOE)-owned sites and laboratories. As evidenced by focused metrics, the Project was successful primarily due to the joint commitment of contractor and DOE electrical safety experts, as well as significant support from DOE and contractor senior management. The effort was managed by an assigned project manager, using classical project-management principles that included execution of key deliverables and regular status reports to the Project sponsor. At the conclusion of the Project, the DOE not only realized measurable improvement in the safety of their workers, but also had access to valuable resources that will enable them to do the following: evaluate and improve electrical safety programs; analyze and trend electrical safety events; increase electrical safety awareness for both electrical and non-electrical workers; and participate in ongoing processes dedicated to continued improvement.

  8. Continuous outreach activities performed by a student project team of undergraduates and their program topics in optics and photonics

    Science.gov (United States)

    Hasegawa, Makoto; Tokumitsu, Seika

    2016-09-01

    The out-of-curriculum project team "Rika-Kobo", organized by undergraduate students, has been actively engaged in a variety of continuous outreach activities in the fields of science and technology including optics and photonics. The targets of their activities cover wide ranges of generations from kids to parents and elderly people, with aiming to promote their interests in various fields of science and technologies. This is an out-of-curriculum project team with about 30 to 40 undergraduate students in several grades and majors. The total number of their activities per year tends to reach 80 to 90 in recent years. Typical activities to be performed by the project team include science classes in elementary and/or secondary schools, science classes at other educational facilities such as science museums, and experiment demonstrations at science events. Popular topics cover wide ranges from explanations and demonstrations of nature phenomena, such as rainbow colors, blue sky, sunset color, to demonstration experiments related to engineering applications, such as polarization of light, LEDs, and optical communications. Experimental topics in optics and photonics are especially popular to the audiences. Those activities are very effective to enhance interests of the audiences in learning related knowledges, irrespective of their generations. Those activities are also helpful for the student members to achieve and/or renew scientific knowledges. In addition, each of the activities provides the student members with effective and advantageous Project-Based-Learning (PBL) style experiences including manufacturing experiences, which are advantageous to cultivate their engineering skills.

  9. The Advanced Interdisciplinary Research Laboratory: A Student Team Approach to the Fourth-Year Research Thesis Project Experience

    Science.gov (United States)

    Piunno, Paul A. E.; Boyd, Cleo; Barzda, Virginijus; Gradinaru, Claudiu C.; Krull, Ulrich J.; Stefanovic, Sasa; Stewart, Bryan

    2014-01-01

    The advanced interdisciplinary research laboratory (AIRLab) represents a novel, effective, and motivational course designed from the interdisciplinary research interests of chemistry, physics, biology, and education development faculty members as an alternative to the independent thesis project experience. Student teams are assembled to work…

  10. A review of software project testing

    Directory of Open Access Journals (Sweden)

    Jose Calvo-Manzano Villalón

    2016-03-01

    Full Text Available In this article a review of software projects based on a taxonomy project is established, allowing the development team or testing personnel to identify the tests to which the project must be subjected for validation. The taxonomy is focused on identifying software projects according to their technology. To establish the taxonomy, a development method comprised of 5 phases was applied. The developed taxonomy is comprised of 10 categories and 35 subcategories and was validated by a group of information technology (IT managers and professionals in the field of IT through the use of a survey. The results obtained from the survey are subjected to the Mann-Whitney U test, which indicates that the taxonomy is validated. The taxonomy can be implemented in development organizations with or without a testing team that provides a classification for technology projects.

  11. Science operations management. [with Infrared Astronomy Satellite project

    Science.gov (United States)

    Squibb, G. F.

    1984-01-01

    The operation teams engaged in the IR Astronomical Satellite (IRAS) project included scientists from the IRAS International Science Team. The detailed involvement of these scientists in the design, testing, validation, and operations phases of the IRAS mission contributed to the success of this project. The Project Management Group spent a substantial amount of time discussing science-related issues, because science team coleaders were members from the outset. A single scientific point-of-contact for the Management Group enhanced the depth and continuity of agreement reached in decision-making.

  12. The design explorer project

    DEFF Research Database (Denmark)

    Pejtersen, Annelise Mark; Sonnenwald, Diane H.; Buur, Jacob

    1997-01-01

    the 'Design Explorer' research project whose goal is to specify requirements for an information system that will effectively help design team members from different domains and organizational cultures to locate and utilize diverse information sources and interact more effectively throughout the design process....... The project introduces a new approach to support of design; instead of design guidelines, support is given by creating a transparent information environment in which designers can navigate freely according to their individual preferences. The project is based on a framework that structures the dimensions......, or categories, of domain information which need to be available for a system or product designer/design team in order to determine the characteristics of the artefact, or object of design. These dimensions include information about the different work domains in which the product plays a role during its lifetime...

  13. Decommissioning project management unit started its activities

    International Nuclear Information System (INIS)

    Medeliene, D.

    2002-01-01

    The Decommissioning Project Management Unit team comprises western experts as well as experts from INPP Decommissioning Service who all work as a single team. The DPMU will develop the Final Decommissioning Plan and a more detailed Decommissioning Project, which will describe how the plant will be removed from service and safely decommissioned

  14. Methodologies used in Project Management

    OpenAIRE

    UNGUREANU, Adrian; UNGUREANU, Anca

    2014-01-01

    Undoubtedly, a methodology properly defined and strictly followed for project management provides a firm guarantee that the work will be done on time, in budget and according to specifications. A project management methodology in simple terms is a “must-have” to avoid failure and reduce risks, because is one of the critical success factors, such basic skills of the management team. This is the simple way to guide the team through the design and execution phases, processes and tasks throughout...

  15. Open Source and Proprietary Project Management Tools for SMEs.

    Directory of Open Access Journals (Sweden)

    Veronika Abramova

    2017-05-01

    Full Text Available The dimensional growth and increasing difficulty in project management promoted the development of different tools that serve to facilitate project management and track project schedule, resources and overall progress. These tools offer a variety of features, from task and time management, up to integrated CRM (Customer Relationship Management and ERP (Enterprise Resource Planning modules. Currently, a large number of project management software is available, to assist project team during the entire project lifecycle. We present the main differences between open source and proprietary project management tools and how those could be important for SMEs, describing the key features and how those can assist the project manager and the development team. In this paper, we analyse four open-source project management tools: OpenProject, ProjectLibre, Redmine, LibrePlan and four proprietary tools: Bitrix24, JIRA, Microsoft Project and Asana.

  16. Are We Ready to Go Live with Our Team Projects?

    Directory of Open Access Journals (Sweden)

    Janice Whatley

    2016-05-01

    Over the three years that the Live Projects have been running, feedback indicates that the students gain employability skills from the projects, and the organisations involved develop links with the university and benefit from output from the projects. A number of suggestions for improving the administration of the Live Projects were suggested, such as providing clients with information on timescales and providing students with more guidance on managing the projects.

  17. RISK MANAGEMENT USING PROJECT RECON

    Science.gov (United States)

    2016-11-28

    centralized database . • Project Recon (formerly Risk Recon) is designed to be used by all Program Management Offices, Integrated Project Teams and any...Create growth plans to proactively capture benefits • Customize reports to group opportunities by programmatic, technical, business, contracting, and

  18. Leadership Styles: Perceptions in Information Technology Project Teams

    Science.gov (United States)

    Fune, Roy P.

    2013-01-01

    The purpose of this study was to uncover Information Technology (IT) Project Managers' and IT Professionals' perceptions of effective leadership styles as they apply to project success. There have been prior studies dealing with the differences in perceptions between IT Functional Manager's leadership self-perception versus staff perceptions of…

  19. Highway project cost estimating and management.

    Science.gov (United States)

    2009-02-01

    "This report provides detailed information about the project objectives, deliverables, and findings. The project team : thoroughly reviewed the Montana Department of Transportation (MDT) structure, operations, and current procedures as : related to M...

  20. Earned value project management

    CERN Document Server

    Fleming, Quentin W

    2010-01-01

    Organizations that follow the principles of good Earned Value Management (EVM) create an environment that allows teams to successfully operate and thrive ? even in the face of challenges that could negatively impact their projects. Earned Value Project Management (EVPM) is a methodology used to measure and communicate the real physical progress of a project taking into account the work completed, the time taken and the costs incurred to complete that work. As a result, EVPM allows more educated and effective management decision-making, which helps evaluate and control project risk by measuring project progress in monetary terms. In the first two editions of Earned Value Project Management, Quentin W. Fleming and Joel M. Koppelman provided guidance for project management practitioners already familiar with EVPM, was well as those who were new to the use of this technique. The third edition expanded the information available on of EVPM for medium and smaller projects while still being relevant for larger projec...

  1. Managing MDO Software Development Projects

    Science.gov (United States)

    Townsend, J. C.; Salas, A. O.

    2002-01-01

    Over the past decade, the NASA Langley Research Center developed a series of 'grand challenge' applications demonstrating the use of parallel and distributed computation and multidisciplinary design optimization. All but the last of these applications were focused on the high-speed civil transport vehicle; the final application focused on reusable launch vehicles. Teams of discipline experts developed these multidisciplinary applications by integrating legacy engineering analysis codes. As teams became larger and the application development became more complex with increasing levels of fidelity and numbers of disciplines, the need for applying software engineering practices became evident. This paper briefly introduces the application projects and then describes the approaches taken in project management and software engineering for each project; lessons learned are highlighted.

  2. Fitting the project into the environment : Gulf Heavy Oil Red Cross Projects

    International Nuclear Information System (INIS)

    Sakires, D.G.; Johannesen, D.V.

    1998-01-01

    A reservoir delineation project by Gulf Canada's Heavy Oil Division was reviewed. The six well drilling program was completed in 1997 with minimal negative environmental impacts. The program, dubbed the Red Cross project, took place in the Northern Boreal Forest of Saskatchewan. Its success is attributed to the early involvement of the regulatory agencies in Saskatchewan, on-site environmental investigations, the development of an environmental protection plan, conscientious construction practices, a monitoring program during construction, and a pro-active reclamation plan. The project area is identified as being environmentally sensitive and important as a wildlife habitat area. This successful project demonstrated the usefulness of pre-project planning and team work between industry and the regulators. Details of the planning, construction and planned remedial reclamation actions are described. 11 refs., 2 tabs

  3. Ranking the Project Management Success Factors for Construction Project in South India

    Science.gov (United States)

    Aneesha, K.; Haridharan, M. K.

    2017-07-01

    In Today’s construction industry, to achieve a greater advantage over the firms, success of each project and efficiency is required. Effective Project Management overcomes these types of challenges. This study identifies the success factors which are important for project management in construction project success. From the literature review, 26 factors were found to be critical. Project managers, construction managers, civil engineers, contractors and site engineers were the respondents. After analyzing the data in SPSS software, the dominant factors from the regression analysis are top management support, competent project team, abilities to solve problems, realistic cost and time estimates, information/communication, competency of the project manager are the 6 factors out of 12 in 26 factors. Effective communication between stakeholders got highest priority and client involvement, good leadership, clarity of project goals got second priority. Informal communication gives better results compared to formal communications like written formats. To remove communication barrier with the stakeholders, informal communication like speaking face-to-face with the language this fits for the stakeholders.

  4. The interdisciplinary nature of the skills needed by project managers

    Directory of Open Access Journals (Sweden)

    Trevor Nesbit

    Full Text Available The purpose of this paper is to explore and analyse the additional skills that are transferrable across different sectors, that project managers require and that go beyond technical project management skills to enable them to be successful in what is becoming an increasingly interdisciplinary role.The conclusions highlight that the project management role requires a range of non- technical project management skills and characteristics to enable project management to be carried out successfully. These non- technical project management skills and characteristics include the ability to build relationships with stakeholders; possessing formal project management certification; understanding the creation and functioning of project teams; understanding the political environment that the project exists in; the ability to work in a team; possessing leadership and management skills; possessing interpersonal and communication skills and possessing a strategic orientation.The skills and characteristics that are perceived by the cross section of project managers as being the most important are possessing interpersonal and communication skills; possessing leadership and management skills; the ability to work in a team and the ability to build relationships with stakeholders. Interpersonal and communication skills along with the ability to work in a team are not included significantly in job advertisements for project managers, with the requirement to have them potentially being assumed and not needed to be stated.This research provides a basis for a further study involving in-depth interviews with project managers from the information technology sector with the aim of highlighting specific projects where these additional skills have been vital to the success of these projects.Issues surrounding the political environment of the project from the perspective of different genders; the importance interpersonal and communication skills along with team work for

  5. Collaboration and Virtualization in Large Information Systems Projects

    Directory of Open Access Journals (Sweden)

    Stefan Ioan NITCHI

    2009-01-01

    Full Text Available A project is evolving through different phases from idea and conception until the experiments, implementation and maintenance. The globalization, the Internet, the Web and the mobile computing changed many human activities, and in this respect, the realization of the Information System (IS projects. The projects are growing, the teams are geographically distributed, and the users are heterogeneous. In this respect, the realization of the large Information Technology (IT projects needs to use collaborative technologies. The distribution of the team, the users' heterogeneity and the project complexity determines the virtualization. This paper is an overview of these aspects for large IT projects. It shortly present a general framework developed by the authors for collaborative systems in general and adapted to collaborative project management. The general considerations are illustrated on the case of a large IT project in which the authors were involved.

  6. The One-Page Project Manager Comunicate and Manage Any Project With a Single Sheet of Paper

    CERN Document Server

    Campbell, Clark A

    2007-01-01

    The One-Page Project Manager shows you how to boil down any project into a simple, one-page document that can be used to communicate all essential details to upper management, other departments, suppliers, and audiences. This practical guide will save time and effort, helping you identify the vital parts of a project and communicate those parts and duties to other team members.

  7. One System Integrated Project Team Progress in Coordinating Hanford Tank Farms and the Waste Treatment Plant

    International Nuclear Information System (INIS)

    Skwarek, Raymond J.; Harp, Ben J.; Duncan, Garth M.

    2013-01-01

    The One System Integrated Project Team (IPT) was formed at the Hanford Site in late 2011 as a way to improve coordination and itegration between the Hanford Tank Waste Treatment and Immobilization Plant (WTP) and the Tank Operations Contractor (TOC) on interfaces between the two projects, and to eliminate duplication and exploit opportunities for synergy. The IPT is composed of jointly staffed groups that work on technical issues of mutal interest, front-end design and project definition, nuclear safety, plant engineering system integration, commissioning, planning and scheduling, and environmental, safety, health and quality (ESH&Q) areas. In the past year important progress has been made in a number of areas as the organization has matured and additional opportunities have been identified. Areas covered in this paper include: Support for development of the Office of Envirnmental Management (EM) framework document to progress the Office of River Protection's (ORP) River Protection Project (RPP) mission; Stewardship of the RPP flowsheet; Collaboration with Savannah River Site (SRS), Savannah River National Laboratory (SRNL), and Pacific Northwest National Laboratory (PNNL); Operations programs integration; and, Further development of the waste acceptance criteria

  8. El Paso County Geothermal Project at Fort Bliss. Final Project Report

    Energy Technology Data Exchange (ETDEWEB)

    Lear, Jon [Ruby Mountain Inc., Salt Lake City, UT (United State); Bennett, Carlon [Ruby Mountain Inc., Salt Lake City, UT (United State); Lear, Dan [Ruby Mountain Inc., Salt Lake City, UT (United State); Jones, Phil L. [Ruby Mountain Inc., Salt Lake City, UT (United State); Burdge, Mark [Evergreen Clean Energy Management, Provo, UT (United States); Barker, Ben [Evergreen Clean Energy Management, Provo, UT (United States); Segall, Marylin [Univ. of Utah, Salt Lake City, UT (United States). Energy and Geoscience Inst.; Moore, Joseph [Univ. of Utah, Salt Lake City, UT (United States). Energy and Geoscience Inst.; Nash, Gregory [Univ. of Utah, Salt Lake City, UT (United States). Energy and Geoscience Inst.; Jones, Clay [Univ. of Utah, Salt Lake City, UT (United States). Energy and Geoscience Inst.; Simmons, Stuart [Univ. of Utah, Salt Lake City, UT (United States). Energy and Geoscience Inst.; Taylor, Nancy [Univ. of Utah, Salt Lake City, UT (United States). Energy and Geoscience Inst.

    2016-02-01

    The El Paso County Geothermal Project at Fort Bliss was an effort to determine the scale and scope of geothermal resources previously identified on Fort Bliss’ McGregor Range in southern Otero County, New Mexico. The project was funded with a $5,000,000 grant to El Paso County from the U.S. Department of Energy (DOE) as part of the American Recovery and Reinvestment Act of 2009 and a $4,812,500 match provided by private sector partners. The project was administered through the DOE Golden Field Office to awardee El Paso County. The primary subcontractor to El Paso County and project Principal Investigator - Ruby Mountain Inc. (RMI) of Salt Lake City, Utah - assembled the project team consisting of Evergreen Clean Energy Management (ECEM) of Provo, Utah, and the Energy & Geoscience Institute at the University of Utah (EGI) in Salt Lake City, UT to complete the final phases of the project. The project formally began in May of 2010 and consisted of two preliminary phases of data collection and evaluation which culminated in the identification of a drilling site for a Resource Confirmation Well on McGregor Range. Well RMI 56-5 was drilled May and June 2013 to a depth of 3,030 ft. below ground level. A string of slotted 7 inch casing was set in 8.75 inch hole on bottom fill at 3,017 ft. to complete the well. The well was drilled using a technique called flooded reverse circulation, which is most common in mineral exploration. This technique produced an exceptionally large and complete cuttings record. An exciting development at the conclusion of drilling was the suspected discovery of a formation that has proven to be of exceptionally high permeability in three desalinization wells six miles to the south. Following drilling and preliminary testing and analysis, the project team has determined that the McGregor Range thermal anomaly is large and can probably support development in the tens of megawatts.

  9. SDN Project

    Energy Technology Data Exchange (ETDEWEB)

    Smith, Rhett [Schweitzer Engineering Laboratories Inc, Pullman, WA (United States)

    2016-12-23

    The SDN Project completed on time and on budget and successfully accomplished 100% of the scope of work outlined in the original Statement of Project Objective (SOPO). The SDN Project formed an alliance between Ameren Corporation, University of Illinois Urbana- Champaign (UIUC), Pacific Northwest National Laboratories (PNNL), and Schweitzer Engineering Laboratories, Inc. (SEL). The objective of the SDN Project is to address Topic Area of Interest 2: Sustain critical energy delivery functions while responding to a cyber-intrusion under Funding Opportunity Announcement DE-FOA-0000797. The goal of the project is to design and commercially release technology that provides a method to sustain critical energy delivery functions during a cyber intrusion and to do this control system operators need the ability to quickly identify and isolate the affected network areas, and re-route critical information and control flows around. The objective of the SDN Project is to develop a Flow Controller that monitors, configures, and maintains the safe, reliable network traffic flows of all the local area networks (LANs) on a control system in the Energy sector. The SDN team identified the core attributes of a control system and produced an SDN flow controller that has the same core attributes enabling networks to be designed, configured and deployed that maximize the whitelisted, deny-bydefault and purpose built networks. This project researched, developed and commercially released technology that: Enables all field networks be to configured and monitored as if they are a single asset to be protected; Enables greatly improved and even precalculated response actions to reliability and cyber events; Supports pre-configured localized response actions tailored to provide resilience against failures and centralized response to cyber-attacks that improve network reliability and availability; Architecturally enables the right subject matter experts, who are usually the information

  10. Coordinators' experience-self evaluation of project development status

    International Nuclear Information System (INIS)

    Sijali, I.V

    2009-01-01

    Outlines the progress of the project as follows, design cleared ny NLO, PMO and team refined the submitted project design to improve it's quality. Comments and any questions invited deadline 23 may 2008, endorsement of the project by Tuesday 24 June 2008 and project completed

  11. A process model for design team communication within fast-track building projects using project websites

    NARCIS (Netherlands)

    Otter, den A.F.H.J.; Reymen, I.M.M.J.

    2008-01-01

    The factor time within building projects is on high pressure because of the increasing need for faster delivery of buildings. Within fast track, complex building projects the design process is an important key. Through case analyses offart-hack design processes it became obvious that process and

  12. Continued multidisciplinary project-based learning - implementation in health informatics.

    Science.gov (United States)

    Wessel, C; Spreckelsen, C

    2009-01-01

    Problem- and project-based learning are approved methods to train students, graduates and post-graduates in scientific and other professional skills. The students are trained on realistic scenarios in a broader context. For students specializing in health informatics we introduced continued multidisciplinary project-based learning (CM-PBL) at a department of medical informatics. The training approach addresses both students of medicine and students of computer science. The students are full members of an ongoing research project and develop a project-related application or module, or explore or evaluate a sub-project. Two teachers guide and review the students' work. The training on scientific work follows a workflow with defined milestones. The team acts as peer group. By participating in the research team's work the students are trained on professional skills. A research project on a web-based information system on hospitals built the scenario for the realistic context. The research team consisted of up to 14 active members at a time, who were scientists and students of computer science and medicine. The well communicated educational approach and team policy fostered the participation of the students. Formative assessment and evaluation showed a considerable improvement of the students' skills and a high participant satisfaction. Alternative education approaches such as project-based learning empower students to acquire scientific knowledge and professional skills, especially the ability of life-long learning, multidisciplinary team work and social responsibility.

  13. WFIRST Project Science Activities

    Science.gov (United States)

    Gehrels, Neil

    2012-01-01

    The WFIRST Project is a joint effort between GSFC and JPL. The project scientists and engineers are working with the community Science Definition Team to define the requirements and initial design of the mission. The objective is to design an observatory that meets the WFIRST science goals of the Astr02010 Decadal Survey for minimum cost. This talk will be a report of recent project activities including requirements flowdown, detector array development, science simulations, mission costing and science outreach. Details of the interim mission design relevant to scientific capabilities will be presented.

  14. CO-OP JIGSAW TEAM PROJECTS: A COOPERATIVE TEACHING METHOD TO IMPROVE STUDENTS‘ SPEAKING SKILL (An Experimental Study in a Senior High School

    Directory of Open Access Journals (Sweden)

    Diaz Innova Citra Arum

    2017-12-01

    Full Text Available An effective speaking activity involves active students to participate and create a life communication. The ideal condition of English speaking class involves the students‘ effectiveness in participating teaching and learning process. Nevertheless, some problems are emerged and one of them is that they often get nervous to speak in front of many people when they are asked to present their work to their friends. This paper reveals an experiment study in teaching speaking in a senior high school in Lamongan, East Java. It discusses about the effectiveness of cooperative teaching method known as coop jigsaw team projects in teaching speaking. All tenth grade students were used as the population and eighty students were taken as sample being divided into experimental group taught using coop jigsaw team projects and control group taught using direct instruction. Cluster random sampling was applied as the technique to determine sample. To obtain the data of students‘ speaking score, a speaking test was conducted. The score was the average score resulted by two independent examiners. The data were analysed through descriptive and inferential analysis using two-sample t-test. The research hypothesised that coop jigsaw will result a better English speaking score rather than direct instruction method. The research finding using 95% significance level shows that coop jigsaw team projects was more effective in teaching speaking compared to direct instruction for the tenth grade students because the activities in coop jigsaw team project pushed the students to be more active and cooperative in learning speaking.

  15. Project risk management: A review of an institutional project life cycle

    Directory of Open Access Journals (Sweden)

    Wanjiru Gachie

    2017-11-01

    Full Text Available This article is a desktop analysis of project risk management involving a project management institutional restructuring. The pragmatic nature of this research allows for the literature review and the document analysis to be integrated and presented as both a descriptive and analytical research. The analysis demonstrates that the project committee did not proactively manage project risk. The restructuring was a change management project, entailing the implementation of many organisational changes, such as restructuring, lay-off of some part of the administrative workforce, adoption of new technology, provision of new approaches to well-established procedures, and implementation of new performance initiative, the process which should have been managed with an effective integrated risk strategy and plan. Analysis of the restructuring project risk management exhibits little evidence of a systematic (computer based or manual record that should have provided policies, procedures, and structures for managing risk. The article concludes that the restructuring risk process was inadequate and it could not have ensured a successful project. An analysis of the restructuring project risk monitoring and control exhibits a reactive rather than proactive application of risk management procedures. The analysis further indicates that the committee failed to make use of the various project risk management processes, standards, and guidelines. Based on the conclusions, the article recommends that project risk planning, strategy, control, and monitoring should be put in place for future institutional projects. The project management team should also put in place procedures for primary stakeholders engagements, identify and address their nature of interest and power in future risk management projects

  16. Catalog of Investment Projects in Bulgaria

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2011-10-15

    This catalog includes information about 129 potential investment projects in Bulgaria and was developed by a team of experts from InvestBulgaria Agency in cooperation with municipalities and private companies. The document presents in brief general facts about the regions in Bulgaria. Projects are divided into the following categories: Tourism, Manufacturing, Urban Planning, Real Estate, Environment and renewable energy sources, Commerce, and Innovative and creative projects. The catalog provides detailed information about each project such as: status of the project, location, ownership, infrastructure, estimated value, contact information, etc.

  17. Implementing information systems with project teams using ethnographic-action research

    NARCIS (Netherlands)

    Hartmann, Timo; Fischer, Martin; Haymaker, John

    2009-01-01

    Architecture, engineering, and construction (AEC) projects are characterized by a large variation in requirements and work routines. Therefore, it is difficult to develop and implement information systems to support projects. To address these challenges, this paper presents a project-centric

  18. The Little Black Book of Project Management

    CERN Document Server

    Thomsett, Michael C

    2009-01-01

    For nearly twenty years, The Little Black Book of Project Management has provided businesspeople everywhere with a quick and effective introduction to project management tools and methodology. The revised and updated third edition reflects the newest techniques, the latest project management software, as well as the most recent changes to the Project Management Body of Knowledge (PMBOK™). Readers will find invaluable strategies for: • Organizing any project • Choosing the project team • Preparing a budget and sticking to it • Scheduling, flowcharting, and controlling a project • Preparing proj

  19. Capital effectiveness in a capital intensive project

    Energy Technology Data Exchange (ETDEWEB)

    Yarossi, M.E. (IPA Institute, The Hague (Netherlands))

    2009-07-01

    The technical difficulty of incorporating new technology in capital intensive projects has been underestimated. Bio-refineries projects are no exemption. These projects in many occasions have assigned inadequate project resources, such as lean project teams and overly optimistic contingencies. Furthermore, project developers have set unrealistic expectations; for example: aggressive schedule duration, low cost targets and optimistic operability targets. These project drivers set before project's authorization compromise the project's outcome. In many cases, this translates into lower return on investment, higher costs, and lower operability. In order to counteract these outcomes, it is critical for capital intensive projects, like bio-refineries, to have a well define project which will enable to increase its chance of success. IPA's research has shown that bio-refineries projects have poor project performance due to poor project practices, lack of owner project controls and inadequate change management. An adequate risk analysis during definition is a critical component of a project's success, especially when there is new technology, like biomass conversion. It is of outmost importance to asses this technology and set realistic expectations. parallel to this, there is a need to have a well established execution strategy, which should be maintained throughout the execution of the project. In conclusion, IPA's research has indicated that bio-refineries, as any other capital intensive project, need to assign adequate resources at an early state of project development, by making sure there is and adequate team in place, reasonable schedule, technical difficulties evaluation, and keeping control during execution. Although these elements might be seen as common practices that should be taken into account when developing a project, many projects being their execution without having a proper foundation, and thus affecting the project

  20. Managing projects using a project management approach

    Directory of Open Access Journals (Sweden)

    Marko D. Andrejić

    2011-04-01

    Full Text Available Modern management theory treats all complex tasks and duties like projects and make these projects possible to be managed by a particular organizational-management concept in order to achieve a goal effectively. A large number of jobs and tasks performed in the system of defense or for defense purposes have the characteristics of projects. Project management is both a skill and a science of monitoring human, material, financial, energy and other resources to achieve required objectives within the given limits: deadlines, time, budget, possibility of realization and the satisfaction of the interests of all project participants. Project management is a traditional area of applied (or functional management focused on managing complex and uncertain situations with defined goals. Introduction In conditions of rapid change and high uncertainty, only adaptive organizations survive, i. e. those that are able not only to react quickly to changes but also to proactively take advantage of changes. Development of project management The biggest influence on the development of the area had complex jobs within the engineering profession. In parallel with the traditional approach new approaches began to develop, while the traditional one still remained in use. Contrary to the traditional engineering approach, a dynamic model first developed in order to respond to demands for greater control of costs. Project management Project management is a skill and knowledge of human and material resources to achieve set objectives within prescribed limits: deadlines, time, budget, possibility of realization, and the satisfaction of all participants in the project. In order to realize a project effectively, it is necessary to manage it rationally. Planning and project management A project plan is a document that allows all team members insight on where to go, when to start and when to arrive, what is necessary to be done in order to achieve the project objectives and what

  1. American specialists and SAP project

    International Nuclear Information System (INIS)

    Andrlova, Z.

    2008-01-01

    Within the past days of November the project teams of SAP Nuclear in Slovenske elektrarne, a. s. incorporated the specialists from PSEG from New Jersey, U.S.A. The goal of their stay here was to pass on the professional experience and good practice from the implementation of quite demanding project in the nuclear power plants. We have learned more about the company and the objectives from an interview with Clay Warren, SAP Nuclear Project Manager in SE. (author)

  2. Meeting of the ITER CTA Project Board

    International Nuclear Information System (INIS)

    Vlasenkov, V.

    2002-01-01

    The meeting of the ITER co-ordinated technical activities project board took place in Tokyo, Japan, on 21 January 2002, coinciding with the second Negotiators meeting (N2). Twelve participants, project board members and experts from Canada, European Union, the Russian Federation and the international team attended the meeting. The project board agreed to provide an R and D plan by June 2002, to be linked with the procurement allocation, for the period following the CTA. The ITER International Team Leader developed a proposal on establishing the working groups for drafting technical specifications for the most urgent procurement items

  3. Essential Skills for Project Stakeholders Identification: Sustainability Perspective

    Directory of Open Access Journals (Sweden)

    Md. Mashiur Rahman

    2017-09-01

    Full Text Available In every life cycle of the project there are numerous people or organizations involved either directly or indirectly. While these type of people and organizations involved are called stakeholders and these may include the project team, client or customer, community, environment, suppliers, government. Stakeholders contribute and share their experiences, knowledge, and insights to support the project throughout its life cycle and therefore it is crucial to capture their input. However, before initiation of the project, stakeholders need to be identified. Following the fact that there are strategies and processes for stakeholder identification, it is not clear what skills are needed to employ those strategies for stakeholder identification. These skills are exceedingly important to have because in today's corporate world, the project team must be flexible in every aspect of their job and be able to complement their skills for the success of stakeholder identification. Using literature review, this paper seeks to describe the skills of project leader needed to identify the project team and the external stakeholders. Inductive approach was followed in this study and data was collected qualitatively using secondary sources. There are two essential skills i.e. relationship building skills and communication skills for internal stakeholders and four major skills i.e. communication skills, people skills, intellectual skills and conceptual skills for external stakeholders are identified for the identification of project stakeholders through literature review considering the sustainability issues in the project management.

  4. Planning and Managing Drupal Projects

    CERN Document Server

    Nordin, Dani

    2011-01-01

    If you're a solo website designer or part of a small team itching to build interesting projects with Drupal, this concise guide will get you started. Drupal's learning curve has thrown off many experienced designers, particularly the way it handles design challenges. This book shows you the lifecycle of a typical Drupal project, with emphasis on the early stages of site planning. Learn how to efficiently estimate and set up your own project, so you can focus on ways to make your vision a reality, rather than let project management details constantly distract you. Plan and estimate your projec

  5. Implementing Large Projects in Software Engineering Courses

    Science.gov (United States)

    Coppit, David

    2006-01-01

    In software engineering education, large projects are widely recognized as a useful way of exposing students to the real-world difficulties of team software development. But large projects are difficult to put into practice. First, educators rarely have additional time to manage software projects. Second, classrooms have inherent limitations that…

  6. Factors Affecting Project Governance Of Arusha Archdiocesan Food Security And Livelihood Project In Monduli District Tanzania.

    Directory of Open Access Journals (Sweden)

    Kisame Deogratious

    2015-06-01

    Full Text Available Abstract This research project dealt with the factors affecting governance of Food security and livelihood projects a case study of the Food security and livelihood project that was implemented by AAIDRO in Monduli district and included 60 respondents all together. The specific objectives of this study intended to access the Leadership styles that are being used in project governance. The findings of the study indicated that 91.7 of the respondents were in favor of their leaders project governance styles it was portrayed that participative leadership style was being used by the leaders for project governance. Based on a sample of 60 project members this study had confirmed that a project leaders leadership roles like mentor facilitator innovator and coordinator are important in influencing project governance effectiveness which includes team mission goal achievement and empowerment open and honest communication

  7. CQI project improves discharge process.

    Science.gov (United States)

    1998-08-01

    At Gibson Rehab Center in Williamsport, PA, a continuous quality improvement project to bolster the institution's discharge planning process has resulted in increased satisfaction and an award for quality. The 15-month project was spearheaded by a multidisciplinary team charged with identifying areas that had a significant impact on customer service and suggesting better ways of delivering that service. Among the changes the group suggested were establishing a weekly discharge planning group for new neuro patients, assigning a discharge coordinator for each treatment team, and creating an interdisciplinary communication sheet for the home health therapy staff.

  8. The Sellafield repository project information programme

    Energy Technology Data Exchange (ETDEWEB)

    Curd, P J [United Kingdom Nirex Limited (United Kingdom)

    1993-07-01

    The Sellafield Repository Project Information programme has been guided by formal research and by feedback through members of the team. Progress has been made and a significant majority of local people support the project and feel it will benefit the area. (author)

  9. The Sellafield repository project information programme

    International Nuclear Information System (INIS)

    Curd, P.J.

    1993-01-01

    The Sellafield Repository Project Information programme has been guided by formal research and by feedback through members of the team. Progress has been made and a significant majority of local people support the project and feel it will benefit the area. (author)

  10. Field review of fish habitat improvement projects in central Idaho

    International Nuclear Information System (INIS)

    Beschta, R.L.; Griffith, J.; Wesche, T.A.

    1993-05-01

    The goal of this field review was to provide information to the Bonneville Power Administration (BPA) regarding previous and ongoing fish habitat improvement projects in central Idaho. On July 14, 1992, the review team met at the Sawtooth National Recreation Area office near Ketchum, Idaho, for a slide presentation illustrating several habitat projects during their construction phases. Following the slide presentation, the review team inspected fish habitat projects that have been implemented in the last several years in the Stanley Basin and adjacent valleys. At each site the habitat project was described to the field team and a brief period for project inspection followed. The review team visited approximately a dozen sites on the Challis, Sawtooth, and Boise National Forests over a period of approximately two and a half days. There are two objectives of this review namely to summarize observations for specific field sites and to provide overview commentary regarding the BPA habitat improvement program in central Idaho

  11. Making energy projects happen

    International Nuclear Information System (INIS)

    Gilliland, S.F.; Utt, W.P.; Neff, N.T.

    1988-01-01

    In today's business environment, control of energy cost is a major challenge for businesses, institutions, and governmental agencies. New technologies are available to reduce energy costs through cogeneration, cheaper fuels, or other means. Often it is not possible for a Plant Owner to undertake such a project, regardless of how desirable it may be. The authors of this paper show that by applying the principles of Project Structuring and developing a comprehensive project team, the desired reduction in energy costs can be achieved. Various examples are cited, and guidelines are given for an Owner to use

  12. 12 strategies for managing capital projects.

    Science.gov (United States)

    Stoudt, Richard L

    2013-05-01

    To reduce the amount of time and cost associated with capital projects, healthcare leaders should: Begin the project with a clear objective and a concise master facilities plan. Select qualified team members who share the vision of the owner. Base the size of the project on a conservative business plan. Minimize incremental program requirements. Evaluate the cost impact of the building footprint. Consider alternative delivery methods.

  13. Agile project management with GreenHopper 6 blueprints

    CERN Document Server

    Malik, Jaibeer

    2013-01-01

    A step-by-step tutorial-based approach.This book is of great help for agile teams who are already using or planning to use the GreenHopper tooling system to execute agile projects. It suits all roles in an agile project including system administrators, stakeholders, product owners, scrum masters, and team members. Fundamental knowledge of JIRA is essential.

  14. The Challenges and Enhancing Opportunities of Global Project Management: Evidence from Chinese and Dutch Cross-Cultural Project Management

    OpenAIRE

    Zhang, Ying; Marquis, Christopher G; Filippov, Sergey; Haasnoot, Henk-Jan; van der Steen, Martijn

    2015-01-01

    This study investigates the role of national and organisational culture in day-to-day activities of multinational project teams, specifically focusing on differences between Chinese and Dutch project managers. We rely on fieldwork observation and interviews with representatives from a diverse set of organizations in China and the Netherlands. Analyses focus on the impact of cultural differences on five project management processes – (1) project planning, (2) cost and quality management, (3) r...

  15. Agile & Distributed Project Management

    DEFF Research Database (Denmark)

    Pries-Heje, Jan; Pries-Heje, Lene

    2011-01-01

    Scrum has gained surprising momentum as an agile IS project management approach. An obvious question is why Scrum is so useful? To answer that question we carried out a longitudinal study of a distributed project using Scrum. We analyzed the data using coding and categorisation and three carefully...... selected theoretical frameworks. Our conclusion in this paper is that Scrum is so useful because it provides effective communication in the form of boundary objects and boundary spanners, it provides effective social integration by building up social team capital, and it provides much needed control...... and coordination mechanisms by allowing both local and global articulation of work in the project. That is why Scrum is especially useful for distributed IS project management and teamwork....

  16. 97 Things Every Project Manager Should Know

    CERN Document Server

    Davis, Barbee

    2009-01-01

    If the projects you manage don't go as smoothly as you'd like, 97 Things Every Project Manager Should Know offers knowledge that's priceless, gained through years of trial and error. This illuminating book contains 97 short and extremely practical tips -- whether you're dealing with software or non-IT projects -- from some of the world's most experienced project managers and software developers. You'll learn how these professionals have dealt with everything from managing teams to handling project stakeholders to runaway meetings and more. While this book highlights software projects, its w

  17. Habitat Demonstration Unit Project Leadership and Management Strategies

    Science.gov (United States)

    Kennedy, Kriss J.

    2011-01-01

    This paper gives an overview of the National Aeronautics and Space Administration (NASA) led multi-center Habitat Demonstration Unit (HDU) project leadership and management strategies. The HDU project team constructed and tested an analog prototype lunar surface habitat/laboratory called the Pressurized Excursion Module (PEM) during 2010. The prototype unit subsystems were integrated in a short amount of time, utilizing a tiger team approach that brought together over 20 habitation-related technologies and innovations from a variety of NASA centers. This paper describes the leadership and management strategies as well as lessons learned pertaining to leading and managing a multi-center diverse team in a rapid prototype environment. The PEM configuration went from a paper design to an operational surface habitat demonstration unit in less than 12 months. The HDU project is part of the strategic plan from the Exploration Systems Mission Directorate (ESMD) Directorate Integration Office (DIO) and the Exploration Mission Systems Office (EMSO) to test destination elements in analog environments. The 2011 HDU-Deep Space Habitat (DSH) configuration will build upon the PEM work, and emphasize validity of crew operations (remote working and living), EVA operations, mission operations, logistics operations, and science operations that might be required in a deep space context for Near Earth Object (NEO) exploration mission architectures. The 2011 HDU-DSH will be field-tested during the 2011 Desert Research and Technologies Studies (DRaTS) field tests. The HDU project is a "technology-pull" project that integrates technologies and innovations from multiple NASA centers. This project will repurpose the HDU 2010 demo unit that was field tested in the 2010 DRaTS, adding habitation functionality to the prototype unit. This paper will describe the strategy of establishing a multi-center project management team that put in place the key multi-center leadership skills and

  18. The 100-C-7 Remediation Project. An Overview of One of DOE's Largest Remediation Projects - 13260

    International Nuclear Information System (INIS)

    Post, Thomas C.; Strom, Dean; Beulow, Laura

    2013-01-01

    The U.S. Department of Energy Richland Operations Office (RL), U.S. Environmental Protection Agency (EPA) and Washington Closure Hanford LLC (WCH) completed remediation of one of the largest waste sites in the U.S. Department of Energy complex. The waste site, 100-C-7, covers approximately 15 football fields and was excavated to a depth of 85 feet (groundwater). The project team removed a total of 2.3 million tons of clean and contaminated soil, concrete debris, and scrap metal. 100-C-7 lies in Hanford's 100 B/C Area, home to historic B and C Reactors. The waste site was excavated in two parts as 100-C-7 and 100-C-7:1. The pair of excavations appear like pit mines. Mining engineers were hired to design their tiered sides, with safety benches every 17 feet and service ramps which allowed equipment access to the bottom of the excavations. The overall cleanup project was conducted over a span of almost 10 years. A variety of site characterization, excavation, load-out and sampling methodologies were employed at various stages of remediation. Alternative technologies were screened and evaluated during the project. A new method for cost effectively treating soils was implemented - resulting in significant cost savings. Additional opportunities for minimizing waste streams and recycling were identified and effectively implemented by the project team. During the final phase of cleanup the project team applied lessons learned throughout the entire project to address the final, remaining source of chromium contamination. The C-7 cleanup now serves as a model for remediating extensive deep zone contamination sites at Hanford. (authors)

  19. Managing Challenges in a Multi Contractor Project

    Science.gov (United States)

    King, Ron

    2011-01-01

    The presentation provides a project description, describes the integrated product team, and review project challenges. The challenges include programmatic, technical, basic drop tests, heavy drop tests, C-17 envelope expansion, and Ares I-X.

  20. Major Events Coordinated Security Solutions: The Application of the Project Management Body of Knowledge for Managing a Science and Technology Project

    Science.gov (United States)

    2011-02-01

    represents the sum of knowledge related to project management and includes best practises and techniques generally accepted by the project...project has demonstrated that the principles of project management can be applied even to those activities that naturally resist the structure and...team and to engender trust in the output. DRDC believes strongly in the application of sound project management principles and uses an abbreviated

  1. Project management practice and its effects on project success in Malaysian construction industry

    Science.gov (United States)

    Haron, N. A.; Devi, P.; Hassim, S.; Alias, A. H.; Tahir, M. M.; Harun, A. N.

    2017-12-01

    The rapid economic development has increased the demand for construction of infrastructure and facilities globally. Sustainable development and globalization are the new ‘Zeitgeist’ of the 21st century. In order to implement these projects successfully and to meet the functional aim of the projects within their lifetime, an efficient project management practice is needed. The aim of this study is to identify the critical success factors (CSFs) and the extent of use of project management practice which affects project success, especially during the implementation stage. Data were obtained from self-administered questionnaires with 232 respondents. A mixed method of data collection was adopted using semi-structured interview and questionnaire approach. The result of the analysis of data obtained showed that new and emerging criteria such as customer satisfaction, competency of the project team, and performance of subcontractors/suppliers are becoming measures of success in addition to the classic iron triangle’s view of time, cost and quality. An insight on the extent of use of different project management practice in the industry was also achieved from the study.

  2. EXPLORING PROJECT-RELATED FACTORS THAT INFLUENCE LEADERSHIP STYLES AND THEIR EFFECT ON PROJECT PERFORMANCE: A CONCEPTUAL FRAMEWORK

    Directory of Open Access Journals (Sweden)

    Suzaan Pretorius

    2017-12-01

    Full Text Available It is widely accepted that project leaders should adapt their behaviour to meet the unique leadership demands of a variety of situations. Recently, vertical, shared, and horizontal styles of leadership have gained prominence, especially in the project management literature. Several factors are believed to play a role in determining an appropriate balance between these leadership styles. This theoretical study explores the influence of project types, the stage in the project life cycle, organisational project management maturity, and the level of trust and collaboration between project team members on the appropriate balance of leadership styles in projects. This paper presents a conceptual framework of these factors, while empirical results will be reported on in the sequel to this paper.

  3. Integrating TOM into environmental projects, Angela B. Quinlan

    International Nuclear Information System (INIS)

    Caldwell, J.A.

    1992-01-01

    Responsible and cost-effective waste management and environmental restoration are best achieved when the principles and procedures of Total Quality Management are made an integral part of the process. By describing three case histories, we explore and explain techniques for using TQM in environmental projects. Key aspects considered include: quality measurement systems; establishing and maintaining standard operating procedures; management and technical peer review; the use of Quality Improvement Teams; Roadmapping (a new procedure that the US Department of Energy is incorporating into environmental restoration programs); and the role of audit teams in document production. The three case histories covered include: The Department of Energy's Uranium Mill Tailings Remedial Action Project on which Roadmapping and Quality Improvement Teams have led to significant changes in procedures; the EPA ARCS program on which adoption of project management Standard Operating Procedures enhanced cost and schedule control; the Jacobs Engineering TQM program that emphasizes performance measurement and management and project technical peer review

  4. Project risk as identity threat: explaining the development and consequences of risk discourse in an infrastructure project

    NARCIS (Netherlands)

    van Os, A.; van Berkel, F.J.F.W.; de Gilder, T.C.; van Dyck, C.; Groenewegen, P.

    2015-01-01

    This paper explores the role of social identity threat in risk discourse in an infrastructure project, and the consequences risk discourse has for cooperation between stakeholders. We show that risks posed a threat to the identity of the project team, resulting in a discourse focused on attributing

  5. Optic issues in ongoing ERL projects

    International Nuclear Information System (INIS)

    Smith, S.L.; Muratori, B.D.; Owen, H.L.; Hoffstaetter, G.H.; Litvinenko, V.N.; Ben-Zvi, I.; Bai, M.; Beebe-Wang, J.; Blaskiewicz, M.; Calaga, R.; Fischer, W.; Chang, X.Y.; Kayran, D.; Kewisch, J.; MacKay, W.W.; Montag, C.; Parker, B.; Ptitsyn, V.; Roser, T.; Ruggiero, A.; Satogata, T.; Surrow, B.; Tepikian, S.; Trbojevic, D.; Yakimenko, V.; Zhang, S.Y.; Piot, Ph.

    2006-01-01

    A wide range of optics issues for energy recovery linac (ERL)-based projects are illustrated through the presentation of ongoing projects covering both light sources, at Cornell and Daresbury and high energy and nuclear physics accelerators at the Brookhaven National Laboratory. This presented range of projects demonstrates how the different designs teams see the challenges of studying and solving optics issues for their particular project's ERLs, with studies appropriate to the stage of maturity of the project. Finally, as an illustration of the complexity and detail behind a single aspect of ERL optics design we present an overview of the highly important generic topic of longitudinal phase space evolution in ERLs

  6. Evolution of project planning tools in a matrix organization

    Energy Technology Data Exchange (ETDEWEB)

    Furaus, J.P.; Figueroa-McInteer, C.; McKeever, P.S.; Wisler, D.B. [Sandia National Labs., Albuquerque, NM (United States); Zavadil, J.T. [Infomatrix (United States)

    1996-10-01

    Until recently, the Corporate Construction Program at Sandia was experiencing difficulties in managing projects: poor planning and cost estimating caused schedule and budget problems. The first step taken was a Microsoft {reg_sign} Project schedule that provides a standard template for scheduling individual construction projects. It is broken down according to the life cycle of the project and prevents the project team from leaving out an important item. A WBS (work breakdown structure) dictionary was also developed that describes how capital and operating funds are used to develop, design, construct, equip, and manage projects. We also developed a matrix chart that maps the planning guide against the major types of construction projects at Sandia. The guide, dictionary, and matrix chart offer enough flexibility that the project manager can make choices about how to structure work, yet ensure that all work rolls up to the cost categories and key DOE WBS elements. As requirements change, the tools can be updated; they also serve as training tools for new project team members.

  7. The three-dimensional matrix -- An evolution in project management

    Energy Technology Data Exchange (ETDEWEB)

    Glidewell, D.

    1996-09-01

    In the Functional Department Dimension, functional departments such as project management, design, and construction would be maintained to maximize consistency among project teams, evenly allocate training opportunities, and facilitate the crossfeeding of lessons learned and innovative ideas. Functional departments were also determined to be the surest way of complying uniformly with all project control systems required by the Department of Energy (Sandia`s primary external customer). The Technical Discipline dimension was maintained to enhance communication within the technical disciplines, such as electrical engineering, mechanical engineering, civil engineering, etc., and to evenly allocate technical training opportunities, reduce technical obsolescence, and enhance design standards. The third dimension, the Project Dimension, represents the next step in the project management evolution at Sandia, and together with Functional Department and Technical Discipline Dimensions constitutes the three-dimensional matrix. It is this Project Dimension that will be explored thoroughly in this paper, including a discussion of the specific roles and responsibilities of both management and the project team.

  8. Meeting of the ITER CTA project board

    International Nuclear Information System (INIS)

    Vlasenkov, V.

    2002-01-01

    This is information about meeting of the ITER CTA project board, which took place in Moscow, Russian Federation on 22 April 2002 on the occasion of the Third Negotiators Meeting (N3). Thirteen participants, representing PB members and experts from Canada (CA), the European Union (EU), Japan(JA), the Russian federation (RF) and the International Team (IT) attended the meeting chaired by Acad. E. Velikhov. The Project Board took note of the comments made concerning the status of the Participants Teams(PTs)

  9. Chosen aspects of innovative projects management

    Directory of Open Access Journals (Sweden)

    J. Gawlik

    2010-07-01

    Full Text Available Any company willing to maintain its market position has to search and implement innovative products and services. Integrated development ofenterprise’s innovative activity requests a constant search for new technologies and new organizational forms. Ability of effectivemanagement of innovative projects becomes a crucial issue. The paper presents a characteristic of innovative projects accordingly toOECD standards. Project management concepts based on Project Management Institute (PMI and International Project ManagementAssociation (IPMA procedures have been discussed. Key success factors have been defined, i.e.: obtaining assumed project outcome (range, project implementation conform to planned schedule (deadline, maintaining project costs under a certain limit (budget, quality (are the customers satisfied?, resources (team losses and interpersonal relations. Tables comparing product innovativeness with fields of requested know – how for particular product innovativeness levels have been elaborated. Finally, SCRUM method of adaptive project management aiming at providing possibly optimal outcome has been described.

  10. Business System Planning Project, Alternatives Analysis

    International Nuclear Information System (INIS)

    EVOSEVICH, S.

    2000-01-01

    The CHG Chief Information Officer (CIO) requested a study of alternatives to the current business system computing environment. This Business Systems Planning (BSP) Project Alternatives Analysis document presents an analysis of the current Project Controls, Work Management, and Business Management systems environment and alternative solutions that support the business functions. The project team has collected requirements and priorities from stakeholders in each business area and documented them in the BSP System Requirements Specification (SRS), RPP-6297. The alternatives analysis process identifies and measures possible solutions in each of the business process areas against the requirements as documented in the SRS. The team gathered input from both internal and external sources to identify and grade the possible solutions. This document captures the results of that activity and recommends a suite of software products. This study was to select the best product based on how well the product met the requirements, not to determine the platform or hardware environment that would be used. Additional analysis documentation can be found in BSP project files

  11. The Future of Project Management in Technical Communication

    DEFF Research Database (Denmark)

    Kampf, Constance

    2006-01-01

    Project Management increasing shapes workplace communication, especially when technical commuicators participate in cross-disciplinary development teams. This paper looks at the future of project management in technical communication and argues for a communicative approach to project management...... for technical communication students. The Project Management course in the International Bachelor Program of Marketing and Management Communication at the Aarhus School of Business is described, and the implications fortechnical communication curricula are discussed....

  12. Effective utilization of maintenance staff in design and implementation of major project work

    International Nuclear Information System (INIS)

    Wyman, D.; Dingle, J.; Brown, R.

    1995-01-01

    The reorganization of Pickering Nuclear Division some 2 years ago resulted in the formation of the Projects and Modifications department. This department takes an integrated approach to manage all aspects of large projects at Pickering. The integration of Design, Drafting, Procurement, Construction and Operations functions into project teams represents a fundamental change to project management at Pickering. The development of integrated teams has great potential for reducing both the time and cost associated with project implementation, while at the same time improving the quality, and maintainability of the commissioned in service project. The Pickering Rehab organization 1989-1993, established to perform the rehab / retube of Units 3 and 4 had proven that a team environment will produce effective results. The outcome was astounding, critical categories such as Safety, Quality of Work, and Timeliness, had proven the team's effectiveness. The integration of operations maintenance staff into the project work activities is still evolving, and has probably required the most adaptation to change for both the former Construction and Operations organizations. Maximizing the utilization of the maintenance staff in the design and implementation of major project work will prove to be a key to a long term operating success of these projects. This paper will focus in on the effective usage of Maintenance staff in the design and implementation phases of major project work at Pickering, and on the benefits realized using this approach. It will be divided into 5 sections as indicated. 1. Past Project Shortfalls. 2. Benefits of the inclusion of Maintenance staff in the Calandria Vault Rehab Project. 3. Maintenance involvement in the Pickering 'A' Shutdown System Enhancement (SDSE) Project. 4. Challenges resulting from the inclusion of Maintenance staff project teams. 5. Summary. (author)

  13. Forward-Looking Search Within Innovation Projects

    DEFF Research Database (Denmark)

    Jissink, Tymen; Rohrbeck, René; Schweitzer, Fiona

    To develop highly-innovative projects, which are fraught with uncertainty and longer development times, one cannot solely rely on initial planning and budgeting to ensure the project’s outcome remains novel. This study posits that to develop innovative projects, project teams need to engage...... in forward-looking search during development to ensure the project’s outcome remains novel and relevant. We refer to forward-looking search as the search and evaluation of information on markets, customers, and technologies in terms of their future impact. Data on 159 unique innovation projects from...... the Danish manufacturing industry shows that forward-looking search significantly impacts innovativeness. The effect follows an inverted-U shape where the greatest positive effect on innovativeness occurs in moderately planned projects and significantly lower effects in low- and highly planned projects...

  14. Cohesion in Online Student Teams versus Traditional Teams

    Science.gov (United States)

    Hansen, David E.

    2016-01-01

    Researchers have found that the electronic methods in use for online team communication today increase communication quality in project-based work situations. Because communication quality is known to influence group cohesion, the present research examined whether online student project teams are more cohesive than traditional teams. We tested…

  15. The 100-C-7 Remediation Project. An Overview of One of DOE's Largest Remediation Projects - 13260

    Energy Technology Data Exchange (ETDEWEB)

    Post, Thomas C. [U.S. Department of Energy Richland Operations Office, Richland, WA 99352 (United States); Strom, Dean [Washington Closure Hanford LLC, 2620 Fermi Avenue, Richland, WA 99354 (United States); Beulow, Laura [U.S. Environmental Protection Agency, 309 Bradley Boulevard, Suite 115, Richland, WA 99352 (United States)

    2013-07-01

    The U.S. Department of Energy Richland Operations Office (RL), U.S. Environmental Protection Agency (EPA) and Washington Closure Hanford LLC (WCH) completed remediation of one of the largest waste sites in the U.S. Department of Energy complex. The waste site, 100-C-7, covers approximately 15 football fields and was excavated to a depth of 85 feet (groundwater). The project team removed a total of 2.3 million tons of clean and contaminated soil, concrete debris, and scrap metal. 100-C-7 lies in Hanford's 100 B/C Area, home to historic B and C Reactors. The waste site was excavated in two parts as 100-C-7 and 100-C-7:1. The pair of excavations appear like pit mines. Mining engineers were hired to design their tiered sides, with safety benches every 17 feet and service ramps which allowed equipment access to the bottom of the excavations. The overall cleanup project was conducted over a span of almost 10 years. A variety of site characterization, excavation, load-out and sampling methodologies were employed at various stages of remediation. Alternative technologies were screened and evaluated during the project. A new method for cost effectively treating soils was implemented - resulting in significant cost savings. Additional opportunities for minimizing waste streams and recycling were identified and effectively implemented by the project team. During the final phase of cleanup the project team applied lessons learned throughout the entire project to address the final, remaining source of chromium contamination. The C-7 cleanup now serves as a model for remediating extensive deep zone contamination sites at Hanford. (authors)

  16. Open Source and Proprietary Project Management Tools for SMEs.

    OpenAIRE

    Veronika Abramova; Francisco Pires; Jorge Bernardino

    2017-01-01

    The dimensional growth and increasing difficulty in project management promoted the development of different tools that serve to facilitate project management and track project schedule, resources and overall progress. These tools offer a variety of features, from task and time management, up to integrated CRM (Customer Relationship Management) and ERP (Enterprise Resource Planning) modules. Currently, a large number of project management software is available, to assist project team during t...

  17. A project-based geoscience curriculum: select examples

    Science.gov (United States)

    Brown, L. M.; Kelso, P. R.; White, R. J.; Rexroad, C. B.

    2007-12-01

    Principles of constructivist educational philosophy serve as a foundation for the recently completed National Science Foundation sponsored undergraduate curricular revision undertaken by the Geology Department of Lake Superior State University. We integrate lecture and laboratory sessions utilizing active learning strategies that focus on real-world geoscience experiences and problems. In this presentation, we discuss details of three research-like projects that require students to access original data, process and model the data using appropriate geological software, interpret and defend results, and disseminate results in reports, posters, and class presentations. The projects are from three upper division courses, Carbonate Systems, Sequence Stratigraphy, and Geophysical Systems, where teams of two to four students are presented with defined problems of durations ranging from a few weeks to an entire semester. Project goals and location, some background information, and specified dates and expectations for interim and final written and oral reports are provided to students. Some projects require the entire class to work on one data set, some require each team to be initially responsible for a portion of the project with teams ultimately merging data for interpretation and to arrive at final conclusions. Some projects require students to utilize data from appropriate geological web sites such as state geological surveys. Others require students to design surveys and utilize appropriate instruments of their choice for field data collection. Students learn usage and applications of appropriate geological software in compiling, processing, modeling, and interpreting data and preparing formal reports and presentations. Students uniformly report heightened interest and motivation when engaged in these projects. Our new curriculum has resulted in an increase in students" quantitative and interpretive skills along with dramatic improvement in communication and

  18. Integrated Risk Management Within NASA Programs/Projects

    Science.gov (United States)

    Connley, Warren; Rad, Adrian; Botzum, Stephen

    2004-01-01

    As NASA Project Risk Management activities continue to evolve, the need to successfully integrate risk management processes across the life cycle, between functional disciplines, stakeholders, various management policies, and within cost, schedule and performance requirements/constraints become more evident and important. Today's programs and projects are complex undertakings that include a myriad of processes, tools, techniques, management arrangements and other variables all of which must function together in order to achieve mission success. The perception and impact of risk may vary significantly among stakeholders and may influence decisions that may have unintended consequences on the project during a future phase of the life cycle. In these cases, risks may be unintentionally and/or arbitrarily transferred to others without the benefit of a comprehensive systemic risk assessment. Integrating risk across people, processes, and project requirements/constraints serves to enhance decisions, strengthen communication pathways, and reinforce the ability of the project team to identify and manage risks across the broad spectrum of project management responsibilities. The ability to identify risks in all areas of project management increases the likelihood a project will identify significant issues before they become problems and allows projects to make effective and efficient use of shrinking resources. By getting a total team integrated risk effort, applying a disciplined and rigorous process, along with understanding project requirements/constraints provides the opportunity for more effective risk management. Applying an integrated approach to risk management makes it possible to do a better job at balancing safety, cost, schedule, operational performance and other elements of risk. This paper will examine how people, processes, and project requirements/constraints can be integrated across the project lifecycle for better risk management and ultimately improve the

  19. Effects of interdependencies in project teams

    NARCIS (Netherlands)

    Van der Vegt, G.S.; Emans, B.J.M.; Van de Vliert, E.

    The associations between task interdependence, outcome interdependence, and the effectiveness of team members were examined. The sample consisted of 181 employees at 10 engineering companies in The Netherlands. The participants evaluated their interdependence with 1 specific team member and rated

  20. EPR trademark project delivery. The value of experience

    International Nuclear Information System (INIS)

    Leverenz, Ruediger

    2013-01-01

    We are building the EPR trademark reactor fleet. Together. With four EPR trademark projects under construction in the world, AREVA has unrivalled experience in the delivery of large-scale nuclear projects, including more than a thousand lessons learned captured from Olkiluoto 3 and Flamanville 3 projects. This book of knowledge as well as the return of experience of AREVA's and EDF's teams are now being fully leveraged on ongoing projects, especially on Flamanville 3 and Taishan, and will be incorporated in all future EPR TM projects.

  1. Dream Team--The Case of an Undergraduate Surgical Talent Development Project

    Science.gov (United States)

    Jensen, Rune Dall; Ljungmann, Ken; Christensen, Mette Krogh; Møldrup, Ulla; Grøndal, Anne Krogh; Mogensen, Mads Filtenborg; Seyer-Hansen, Mikkel

    2016-01-01

    To be successful, a surgeon must master a variety of skills. To meet the high demand for surgical expertise, an extracurricular undergraduate project was launched. The extracurricular project consists of hands-on laparoscopic training and a mentorship programme. The project aims to find the best surgical talents among fourth-year medical students.…

  2. Perceptions of project managers regarding communication failures and barriers

    Directory of Open Access Journals (Sweden)

    Marilyn de Souza Cyganczuk

    2018-03-01

    Full Text Available The management of communication within a project can be considered as important as any other system within an organization because communication transmits and connects ideas, concepts, experiences and information on a project. This article describes an investigation of the problems in communication encountered by project managers in companies of different sizes and sectors in the project management area and compares these problems with what is found in the literature. Based on the study conducted, it was possible to identify the main barriers and failures in communication in these organizations and compare them with what is in the literature. The results showed that the main barriers and flaws found are: the lack of feedback to the members of the project team, the lack of trust among team members, channeling of misleading and distorted information, the lack of transmission of information or its transmission at an inopportune moment, and the limited knowledge and competencies of project managers, representing poor leadership and consequently impacting communication.

  3. Inequity-aversion and relative kindness intention jointly determine the expenditure of effort in project teams.

    Directory of Open Access Journals (Sweden)

    Jiaojie Han

    Full Text Available The literature on team cooperation has neglected the effects of relative kindness intention on cooperation, which we measure by comparing the kindness intentions of an agent to her group members to the kindness shown by other members to this same agent. We argue that the agent's emotional reaction to material payoff inequity is not constant, but rather affected by her relative kindness intention. Then, we apply the model to team projects with multiple partners and investigate how inequity-aversion and relative kindness intention jointly influence team cooperation. We first consider the case of homogeneous agents, where their marginal productivity levels and technical capacities are the same, and then consider the case of heterogeneous agents, where their marginal productivity levels and technical capacities are not the same. Our results show that inequity-aversion has no effect on effort expenditure in the former case, but does affect it in the latter case. The consideration of relative kindness intention may impact the agents' optimal cooperative effort expenditure when their technical capacities are different. In addition, it is beneficial for team cooperation, and might not only reduce the negative impact but also enhance the positive impact of inequity-aversion on the agents' effort expenditures.

  4. Teaching Small Group Communication: A Do Good Project

    Directory of Open Access Journals (Sweden)

    Elizabeth M. Minei, PhD

    2016-08-01

    Full Text Available This paper focuses on the parameters of a semester-long project called the “Do Good” project, geared towards developing small group communication skills in undergraduate students. This project highlights participation in a social engagement project that allows students to bridge concepts learned in small group communication lectures (e.g., team dynamics, project management, conflict resolution, decision making, leadership with community outreach. Included are an overview of the project, and examples for how each component both challenges students’ ability to communicate in groups and provides motivation that foster students’ ability to link in-class knowledge with practical, real world application.

  5. New Accelerator Projects

    International Nuclear Information System (INIS)

    Delahaye, J.P.

    2010-01-01

    There is large number of ambitious accelerator projects with promising performances in the near (and short term) future which aims at exploring energy and/or luminosity frontiers and Complementary aspects of various particles species. High Energy Physics requirements are extremely demanding with challenging parameters: entering into the new territories of the tera-scale data, high Energy or/and High (Integrated) Luminosity, high performance, high availability, long lifetime, luminosity leveling etc.. New projects are more and more challenging: larger, more powerful, more expensive, technology above present standard. Innovative ideas and breakthrough on novel technologies are key for HEP adventure. Aggressive R and D is imperative on beam and Technology related, on cost and power consumption mitigation.. There is ambitious Test Facilities to address feasibility. More and more time and (M and P) resources are required from first ideas to project proposal: it is of prime importance to launch R and D early, explore all possible options of schemes and technologies (anticipating future Physics requests), make realistic status and schedule estimates (preserve credibility and make reasonable plans). Global Collaboration is mandatory from the R and D phase to the construction and operation in order to make best use of limited resources and available expertise as inspired from successful collaborations on Detectors. The global strategy of new accelerator projects in truly world-wide collaboration aims at: - defining all various Projects and Technology options worth exploring, - taking advantage of global teams made of world-wide experts, and of synergies to address common issues (generic R and D) of various projects, - preparing together plethora of project proposals to cover Physics Landscape (ready for window opportunity), - developing Collaborative/Competition (Experts in Collaboration, Technology and Projects options in Competition), - Joining resources on (few) selected

  6. Integrating a Project Management Approach to E-Business Application Course

    Science.gov (United States)

    Chen, Kuan C.; Chuang, Keh-Wen

    2008-01-01

    Teaching students project managements requires a hands-on approach. Incorporating project management concepts and processes into a student team Web development project adds a dimension that exposes students to the realities of effective Web development. This paper will describe the project management approach used in a Web development course in…

  7. Tools for Monitoring Social Media: A Marketing Research Project

    Science.gov (United States)

    Veeck, Ann; Hoger, Beth

    2014-01-01

    Knowledge of how to effectively monitor social media is an increasingly valued marketing research skill. This study tests an approach for adding social media content to an undergraduate marketing research class team project. The revised project maintains the expected objectives and parameters of a traditional research project, while integrating…

  8. The Motivated Project Team

    Science.gov (United States)

    2009-12-01

    Financial incentives that match level of achievement • Regular, constructive feedback. Hierarchy of Needs ( Abraham H. Maslow ) Team members can be...Much has been written regarding motivational Defense AT&L: November-December 2009 58 theory . To further complicate mat- ters, some motivational... theories clearly contradict others, and a manager’s ability to motivate is, to no small degree, related to his or her leadership approach and inter

  9. Tank waste remediation system characterization project quality policies. Revision 1

    International Nuclear Information System (INIS)

    Trimble, D.J.

    1995-01-01

    These Quality Policies (QPs) describe the Quality Management System of the Tank Waste Characterization Project (hereafter referred to as the Characterization Project), Tank Waste Remediation System (TWRS), Westinghouse Hanford Company (WHC). The Quality Policies and quality requirements described herein are binding on all Characterization Project organizations. To achieve quality, the Characterization Project management team shall implement this Characterization Project Quality Management System

  10. Successful Training Development and Implementation in Plant Modernization Projects

    International Nuclear Information System (INIS)

    Kuhn, A.; Schoenfelder, C.

    2012-01-01

    In plant modernization projects, for life extension or power update, the competence development (in particular, job and needs oriented training) of the plant staff plays an important role for ensuring the highest standard of nuclear safety, and for facilitating an economic operation of the plant. This paper describes challenges, methodology, activities, and results obtained so far from an on-going project in Sweden. - - As conclusion, critical factors for a successful staff training in plant modernization projects include a systematic approach to training, a dedicated training management team, and good interfaces between supplier's engineering teams, experienced training providers, and equipment suppliers.

  11. Experience of valorization projects ISTC for laser technologies

    Science.gov (United States)

    Sartory, A. V.; Stepennov, D. B.; Vlasova, E. Y.; Pokrovsky, K. K.

    2002-04-01

    Application of the achievements of the ISTC projects is one of the main problems being solved to achieve one of the basic goals of the ISTC, namely, to adapt Russian scientists to conditions of developing market economy in Russia. The present report is aimed at rendering of promotional services for ISTC project teams in the context of the program of projects outcomes valorization.

  12. The Eye Diagram: A New Perspective on the Project Life Cycle

    Science.gov (United States)

    Jiang, Bin; Heiser, Daniel R.

    2004-01-01

    The project life cycle, a well-established concept in project management literature and education, is used to highlight the dynamic requirements placed on a typical project manager. As a project moves through the selection, planning, execution, and termination phases, the project manager and team are faced with different, vying areas of…

  13. Governance of innovation project management : necessary and neglected

    NARCIS (Netherlands)

    Stettina, Christoph Johann

    2015-01-01

    The study is motivated by the aspiration to understand project governance in organizations pursuing the development of new products and services across multiple knowledge worker teams. In particular, the following problem statement guides the study: Is governance of innovation project management

  14. CENELEC Project Report Smart House Roadmap (draft)

    NARCIS (Netherlands)

    Hartog, F.T.H. den; Suters, T.; Parsons, J.; Faller, J.

    2010-01-01

    This CENELEC project report has been drafted by a project team and steering group of representatives of interested parties and is to be endorsed on 2010-11-23. Neither the national members of CENELEC nor the CEN-CENELEC Management Centre can be held accountable for the technical content of this

  15. International Chernobyl project [AEA report

    International Nuclear Information System (INIS)

    Anon.

    1991-01-01

    The IAEA have co-ordinated the first international assessment of the radiological consequences of the Chernobyl accident in the affected areas outside the 30km prohibited zone around the reactor. These areas have a total population of about 1 million people, living in approximately 2700 settlements. The main aim of the project was to answer the question 'Is it safe for the population to go on living in the affected areas?'. The project did not investigate radiological health effects among more than 100 000 people evacuated from the 30 km prohibited zone. Nor did it study effects among the emergency personnel temporarily brought into the region for accident management and recovery work (the so-called 'liquidators'). Project teams reviewed official data on environmental contamination from 500 settlements, data collection practices and reporting and also official information on radiation doses received by people living in seven settlements. Other project teams reviewed official data at key medical centres and institutes. Then they examined people both from surveyed contaminated settlement and from surveyed control settlements. The team concluded that there were significant non-radiation related health disorders in populations of both contaminated and control settlements. None of the disorders could be attributed directly to radiation exposure. In particular, no evidence was found for a significant increase in foetal abnormalities; infant and prenatal mortality rates had fallen since the accident. Children were found to be generally healthy with no abnormalities in either thyroid stimulating or thyroid hormones. The accident had created substantial negative psychological consequences, manifesting themselves in terms of anxiety and stress due to continuing high levels of uncertainty. (author)

  16. Student design projects in applied acoustics.

    Science.gov (United States)

    Bös, Joachim; Moritz, Karsten; Skowronek, Adam; Thyes, Christian; Tschesche, Johannes; Hanselka, Holger

    2012-03-01

    This paper describes a series of student projects which are intended to complement theoretical education in acoustics and engineering noise control with practical experience. The projects are also intended to enhance the students' ability to work in a team, to manage a project, and to present their results. The projects are carried out in close cooperation with industrial partners so that the students can get a taste of the professional life of noise control engineers. The organization of such a project, its execution, and some of the results from the most recent student project are presented as a demonstrative example. This latest project involved the creation of noise maps of a production hall, the acoustic analysis of a packaging machine, and the acoustic analysis of a spiral vibratory conveyor. Upon completion of the analysis, students then designed, applied, and verified some simple preliminary noise reduction measures to demonstrate the potential of these techniques. © 2012 Acoustical Society of America

  17. Project DEGRUPE: Goals and Historiographical Contextualization

    Directory of Open Access Journals (Sweden)

    COELHO, Maria Helena da Cruz

    2015-07-01

    Full Text Available This paper aims to present the main axes of the project DEGRUPE whose principal objective is to study the role of the clergy in the construction of the Iberian monarchies and mobility circuits designed by these protagonists. To fulfill this objective, the interuniversity project team of DEGRUPE opted for a comparative perspective between different kingdoms of the Iberian Peninsula. The second part of this paper consists of a brief analysis of the underlying historiographical framework of the project including mainly research on relationship between clergy and royalty in the middle ages.

  18. The EEE Project status and perspectives

    CERN Document Server

    Antolini, R; Baldini Ferroli, R; Bencivenni, G; Blanco, F; Bressan, E; Chiavassa, A; Cifarelli, L; Cindolo, F; Coccia, E; De Pasquale, S; Di Giovanni, A; D'Incecco, M; Fabbri, F L; Garbini, M; Gustavino, C; Hatzifotiadou, D; Imponente, G; La Rocca, P; Librizzi, F; Menghetti, H; Miozzi, S; Pappalardo,G S; Piragino, G; Riggi, F; Sartorelli, G; Sbarra, C; Selvi, M; Williams, C; Zichichi, A

    2007-01-01

    The Extreme Energy Events (EEE) project plans to build and use an array of cosmic ray telescopes for muon detection, distributed over the italian territory. The use of such telescopes, based on Multigap Resistive Plate Chambers (MRPC) will allow the study of cosmic ray showers and the correlation between multiple primaries producing distant showers. The project is also intended to involve high school teams in an advanced research work. The physics items which can be addressed by such array, and the present status and perspectives of the project are here discussed.

  19. THE DEVELOPMENT OF A MODEL INITIATION OF PROJECT IN A FORM OF MARKOV CHAIN

    Directory of Open Access Journals (Sweden)

    Катерина Вікторівна КОЛЕСНІКОВА

    2017-03-01

    Full Text Available The model of the initiation of projects which reproduces a fragment of the general scheme of interaction between the main entities in the project initiation phase is created. Determined that the project initiation through communication links between the four main entities: projects team, environment, the project itself and the customer. The result of the initiation of projects in the emerging communications referred to objects in the design phase through consistency requirements of stakeholders and the adoption of the basic concepts of projects, goal-projects, project planning, evaluation requirements of specialization and competence required for the formation of the project team. This Markov chain is part of the control circuit that includes elements such as the temporary organizational structure of the project design, project team, customer, and environment project. It is shown that the Markov model of interaction between project participants in their initiation phase, taking into account the role of a key player in the project ‑ the customer can determine changes of state and generate recommendations for initiating projects. Results of the study can serve as a basis for creating models of control objects that contain its organizational structure and reflect the parametric properties of the system to obtain information needed for decision making to initiate projects

  20. Project Execution Plan Project 98L-EWW-460 Plutonium Stabilization and Handling DOE 98-D-453

    International Nuclear Information System (INIS)

    MCGRATH, G.M.

    2000-01-01

    This Project Execution Plan (PEP) describes the management methods and responsibilities of the project participants. Project W-460 is sufficiently large to warrant a stand alone PEP. This project specific PEP describes the relationships and responsibilities of the project team and identifies the technical, schedule, and cost baselines that have been established for the project. The Department of Energy (DOE), Hanford Works (Hanford), at Richland, Wa. currently does not have a system capable of stabilizing or packaging large quantities of plutonium-bearing solids to meet DOE technical standard DOE-STD-3013-99. This project will allow Hanford to meet this standard by installing stabilization and packaging equipment (SPE). The SPE is capable of stabilizing and packaging the current inventory of greater than 30 percent plutonium-bearing materials currently stored in the Plutonium Finishing Plant's (PFP) vaults into 3013 storage containers. The scope of this project is to procure and install the SPE via a Hanford contract and coordination with the Savannah River Site. In addition, the project will modify PFP vaults and upgrade the PFP Laboratory measurement systems. The Facility infrastructure will be modified to support the new SPE system and the new standardized storage container configuration

  1. Project Execution Plan Project 98L-EWW-460 Plutonium Stabilization and Handling DOE 98-D-453

    Energy Technology Data Exchange (ETDEWEB)

    HOLSTEIN, W.A.

    1999-08-01

    This Project Execution Plan (PEP) describes the management methods and responsibilities of the project participants. Project W-460 is sufficiently large to warrant a stand alone PEP. This project specific PEP describes the relationships and responsibilities of the project team and identifies the technical, schedule, and cost baselines that have been established for the project. The Department of Energy (DOE), Hanford Works (Hanford), at Richland Wa. currently does not have a system capable of stabilizing or packaging large quantities of plutonium-bearing solids to meet DOE technical standard DOE-STD-3013-96. This project will allow Hanford to meet this standard by installing stabilization and packaging equipment (SPE). The SPE is capable of stabilizing and packaging the current inventory of greater than 50 percent plutonium-bearing materials currently stored in the Plutonium Finishing Plant's (PFP) vaults into 3013 storage containers. The scope of this project is to procure and install the SPE via a Hanford contract and coordination with the Savannah River Site. In addition, the project will modify PFP vaults and upgrade the PFP Laboratory measurement systems. The Facility infrastructure will be modified to support the new SPE system and the new standardized storage container configuration.

  2. Project Execution Plan Project 98L-EWW-460 Plutonium Stabilization and Handling DOE 98-D-453

    Energy Technology Data Exchange (ETDEWEB)

    MCGRATH, G.M.

    2000-06-21

    This Project Execution Plan (PEP) describes the management methods and responsibilities of the project participants. Project W-460 is sufficiently large to warrant a stand alone PEP. This project specific PEP describes the relationships and responsibilities of the project team and identifies the technical, schedule, and cost baselines that have been established for the project. The Department of Energy (DOE), Hanford Works (Hanford), at Richland, Wa. currently does not have a system capable of stabilizing or packaging large quantities of plutonium-bearing solids to meet DOE technical standard DOE-STD-3013-99. This project will allow Hanford to meet this standard by installing stabilization and packaging equipment (SPE). The SPE is capable of stabilizing and packaging the current inventory of greater than 30 percent plutonium-bearing materials currently stored in the Plutonium Finishing Plant's (PFP) vaults into 3013 storage containers. The scope of this project is to procure and install the SPE via a Hanford contract and coordination with the Savannah River Site. In addition, the project will modify PFP vaults and upgrade the PFP Laboratory measurement systems. The Facility infrastructure will be modified to support the new SPE system and the new standardized storage container configuration.

  3. FJET Database Project: Extract, Transform, and Load

    Science.gov (United States)

    Samms, Kevin O.

    2015-01-01

    The Data Mining & Knowledge Management team at Kennedy Space Center is providing data management services to the Frangible Joint Empirical Test (FJET) project at Langley Research Center (LARC). FJET is a project under the NASA Engineering and Safety Center (NESC). The purpose of FJET is to conduct an assessment of mild detonating fuse (MDF) frangible joints (FJs) for human spacecraft separation tasks in support of the NASA Commercial Crew Program. The Data Mining & Knowledge Management team has been tasked with creating and managing a database for the efficient storage and retrieval of FJET test data. This paper details the Extract, Transform, and Load (ETL) process as it is related to gathering FJET test data into a Microsoft SQL relational database, and making that data available to the data users. Lessons learned, procedures implemented, and programming code samples are discussed to help detail the learning experienced as the Data Mining & Knowledge Management team adapted to changing requirements and new technology while maintaining flexibility of design in various aspects of the data management project.

  4. Factors Affecting Process Innovation Teams’ Learning and Their Impact on the Success of the Process Innovation Projects

    Directory of Open Access Journals (Sweden)

    İbrahim H. Seyrek

    2007-06-01

    Full Text Available Based on 145 process innovation teams, we have studied factors supporting team learning and their impact on the success of the process innovation projects. As a result, we have found that team vision, recording and reviewing project related information, filing, following a structural development process and co-location of team members are factors supporting team learning and project success. Also, two dimensions of learning, information acquisition and information implementation, are positively related to the success of the process innovation projects

  5. Understanding the Meaning of “Project Success”

    Directory of Open Access Journals (Sweden)

    Goparaju Purna Sudhakar

    2016-09-01

    Full Text Available Fortune 500 organizations are executing their tasks using projects. Project management is the area of concentration across the world. Different stakeholders have a different perspective about project success. The meaning of project success had been explained in this article. In addition, the Project Critical Success Factors (CSFs were mentioned. The research of Standish Group on project success and project success metrics was presented. Earlier research on the meaning of project success and project critical success factors was highlighted. The works of Jeffery K. Pinto and Dennis P. Slevin, David and Adam, DeLone and McLean, and The Standish Group Research were discussed in this article. The methodology included secondary research based on literature view of prominent empirical studies and the literature reviews by making note of findings and observations from those studies. The initial literature collected led to further search of articles based on their references. The research findings indicate that the top of the most success factors for many projects include project objective, top management commitment, competent project team, and user involvement.

  6. Multidisciplinary Knowledge Transfer in Training Multimedia Projects

    Science.gov (United States)

    Freyens, Benoit; Martin, Marguerite

    2007-01-01

    Purpose--Training multimedia projects often face identical knowledge-transfer obstacles that partly originate in the multidisciplinarity of the project team. The purpose of this paper is to describe these difficulties and the tools used to overcome them. In particular, the aim is to show how elements of cognitive psychology theory (concept maps,…

  7. Use of Multi-Disciplinary Projects To Develop Competence.

    Science.gov (United States)

    Trotman-Dickenson, Danusia

    1992-01-01

    Undergraduate technology and business students at the Polytechnic of Wales (United Kingdom) participated in multi-disciplinary team projects to experience real life business challenges and develop competences that employers expect in professionals. Lists characteristics of successful multi-disciplinary projects, discusses cost and industry…

  8. Cooperative Learning in Graduate Student Projects: Comparing Synchronous versus Asynchronous Collaboration

    Science.gov (United States)

    Strang, Kenneth

    2013-01-01

    Cooperative learning was applied in a graduate project management course to compare the effectiveness of asynchronous versus synchronous online team meetings. An experiment was constructed to allocate students to project teams while ensuring there was a balance of requisite skills, namely systems analysis and design along with HTML/Javascript…

  9. Performance of consultants on government projects in ghana: Client and contractor pespective

    Directory of Open Access Journals (Sweden)

    J. Dadzie

    2013-07-01

    Full Text Available Construction project consultants share the characteristics of helping their clients address problems and improve upon project performance; they have a passion for the wisdom and expertise they bring to the project, and they have the ability to galvanize clients into action. However, it is an open secret that many projects often delay. Also, it is a known fact that most project contract figures swell more than double the original tender figure. Meanwhile, there are supervising consultants who are engaged and paid to manage such important projects. Their role however, is to complement the effort of contractors to ensure a successful completion of a project. The aim of this research is to identify factors affecting the performance of consultants on government projects, and to rank these factors according to their relative importance from the perspective of consultants. Analysis of the factors considered in a survey indicate that the main factors negatively affecting the performance of consultants are: urgency of the project at hand, project duration, variations, political influence from higher authority, timely decision making on the part of the consulting team and the experience of the design team on the project. The others are the ability of the consultants to work as a team, creativity on the part of the consultants in controlling cost and developing own efficiencies so that contract sums are kept within budget .

  10. Globalization And Knowledge Management In Projects

    Directory of Open Access Journals (Sweden)

    Bubel Dagmara

    2015-06-01

    Full Text Available Knowledge management is a field of management dealing with the use of knowledge, methods, and tools to effectively coordinate complex and unique projects. In accordance with this definition, project knowledge can be treated as a useful resource of information that allows projects to be implemented in compliance with its objectives: time, costs, and quality of results. Knowledge in the activity of an organization, including in the implementation of projects, has for many years been an area of interest to researchers, who confirmed its key importance for building permanent competitive advantages of companies and enterprises. In project management, this issue takes on a new character, as it is transferred to the field of dynamic, time restricted, temporary, and team-implemented projects. The aim of this paper is to present the results of a survey regarding the use of practices of knowledge management in projects in international organizations and to show that the concept of knowledge management in projects is a tool conducive to spreading the process of globalization.

  11. A recent Cleanroom success story: The Redwing project

    Science.gov (United States)

    Hausler, Philip A.

    1992-12-01

    Redwing is the largest completed Cleanroom software engineering project in IBM, both in terms of lines of code and project staffing. The product provides a decision-support facility that utilizes artificial intelligence (AI) technology for predicting and preventing complex operating problems in an MVS environment. The project used the Cleanroom process for development and realized a defect rate of 2.6 errors/KLOC, measured from first execution. This represents the total amount of errors that were found in testing and installation at three field test sites. Development productivity was 486 LOC/PM, which included all development labor expended in design specification through completion of incremental testing. In short, the Redwing team produced a complex systems software product with an extraordinarily low error rate, while maintaining high productivity. All of this was accomplished by a project team using Cleanroom for the first time. An 'introductory implementation' of Cleanroom was defined and used on Redwing. This paper describes the quality and productivity results, the Redwing project, and how Cleanroom was implemented.

  12. Enhanced project management tool

    Science.gov (United States)

    Hsu, Chen-Jung (Inventor); Patel, Hemil N. (Inventor); Maluf, David A. (Inventor); Moh Hashim, Jairon C. (Inventor); Tran, Khai Peter B. (Inventor)

    2012-01-01

    A system for managing a project that includes multiple tasks and a plurality of workers. Input information includes characterizations based upon a human model, a team model and a product model. Periodic reports, such as one or more of a monthly report, a task plan report, a schedule report, a budget report and a risk management report, are generated and made available for display or further analysis or collection into a customized report template. An extensible database allows searching for information based upon context and upon content. Seven different types of project risks are addressed, including non-availability of required skill mix of workers. The system can be configured to exchange data and results with corresponding portions of similar project analyses, and to provide user-specific access to specified information.

  13. A Decade of Project 2061

    Science.gov (United States)

    Lagowski, J. J.

    1996-04-01

    question was: What should all high school graduates know and be able to do in science, mathematics, and technology? Science for All Americans established the ground rules for what has become to be known as systematic reform. Thus, reform must be comprehensive in the sense that it involves all children, all grades, and all subjects; and, it must be long term. The approach to curriculum development was ambitious. Curriculum reform should be shaped by a vision of the lasting knowledge and skills students need to acquire by the time they become adults. Moreover, the common core of learning in science, mathematics, and technology should center on science literacy. A common set of learning goals did not imply a uniform curriculum, funding methods, or materials. But above all, schools should not try to teach more, but less. In other words, the new curriculum to be developed was not the accretion of additional layers of material on top of the existing structure; that's why the designers suggested it might take a quarter of a century to achieve its goals. Science for All Americans construed the notion of science literacy broadly, by focusing on interconnected understanding in the natural and social sciences, mathematics, and technology. After the publication of Science for All Americans, Project 2061 turned its attention to developing tools to help redesign curricula around the science literacy goals and to helping teachers think through the implications for other aspects of the education system. To illustrate the flexibility of this approach, Project 2061 established school district teams in six diverse geographical areas--three rural school districts in Georgia; the school districts in Philadelphia, San Antonio, San Diego, and San Francisco; and a small suburban school district near Madison, Wisconsin. Planning for 13 years of schooling in science, mathematics, and technology involved teams of teachers in each ISD. Each team included five elementary teachers, five middle school

  14. Critical success factors influencing project success in the ...

    African Journals Online (AJOL)

    team members experience job satisfaction and are, therefore, motivated to be ... who are principal agents that were the interface between the client and the contractor. .... define roles and responsibilities of project team members. According.

  15. Documentation assessment, Project C-018H, 200-E area effluent treatment facility

    International Nuclear Information System (INIS)

    Peres, M.W.; Connor, M.D.; Mertelendy, J.I.

    1994-01-01

    Project C-018H is one of the fourteen subprojects to the Hanford Environmental Compliance (HEC) Project. Project C-018H provides treatment and disposal for the 242-A Evaporator and PUREX plant process condensate waste streams. This project used the Integrated Management Team (IMT) approach proposed by RL. The IMT approach included all affected organizations on the project team to coordinate and execute all required project tasks, while striving to integrate and satisfy all technical, operational, functional, and organizational objectives. The HEC Projects were initiated in 1989. Project C-018H began in early 1990, with completion of construction currently targeted for mid-1995. This assessment was performed to evaluate the effectiveness of the management control on design documents and quality assurance records developed and submitted for processing, use, and retention for the Project. The assessment focused primarily on the overall adequacy and quality of the design documentation currently being submitted to the project document control function

  16. Influence of Selected Stakeholders of Construction Investment Projects on the Course of Project

    Science.gov (United States)

    Bizon-Górecka, Jadwiga; Górecki, Jarosław

    2017-10-01

    The article presents an entity perspective of the construction investment projects. In a course of the project there are stakeholders who have an indirect influence (e.g. decision-makers in the selection of projects) or a direct influence (e.g. members of the project team). An intuitive opinion about a significant influence of project stakeholders on the project’s course encouraged the authors to undertake a research in this area. The article illustrates the initial phases of the construction project life cycle in a perspective of the entities and, in particular, a role of different stakeholders in making decisions that affect a course of the project. An analysis of the structure of the construction project life cycle makes a substantial involvement of various subjects in the initial phases of the project, i.e. in an initial phase and during a creation of the structures. A key point is to underline the factors of decision-making by the participants of the construction process. It was indicated that the stakeholders have a different impact on the course of the project. In large projects, which have many stakeholders, their role in the implementation of the investment project can vary, depending on the life cycle of the project. They can have positive or negative impacts on achieving the project objectives. The paper presents the results of 100 surveys made among participants of the building processes, executors of the construction projects in the Kuyavian-Pomeranian region. The study was conducted in December 2016 and January 2017. It revealed what is the impact of individual stakeholders of the construction projects on the course of the project. A special attention was paid to a complex relationship between objectives of the project and stakeholders’ goals. A great care to the smallest possible number of risks, which may arise from the different objectives of the project and its stakeholders’ goals, should be focused on the augmentation of correlation of

  17. Investigating the extent to which mobile phones reduce Knowledge Transfer barriers in Student Project Teams

    Directory of Open Access Journals (Sweden)

    Michael E. Kyobe

    2011-03-01

    Full Text Available Group learning plays a key role in the transfer of knowledge. In institutions of learning, it enhances students’ understanding, critical thinking, integration of knowledge and knowledge sharing. However, the transfer of knowledge in group projects is often impeded by factors such as time and budget constraints, individual and social barriers, and a lack of motivation.Institutions of learning are increasingly adopting information and communication technologies (e.g. mobile technologies to provide solutions to the challenges facing them. Whilst the integration of the mobile context and technologies in learning environment has been encouraged over the years, and indeed many students today can use mobile phones, the effectiveness of these technologies in reducing impediments to knowledge transfer in group learning has not been investigated.This study investigated the extent to which mobile phones reduce the barriers to knowledge transfer in project groups. The impediments examined include the nature of knowledge, social barriers, lack of time and lack of motivation. Quantitative and qualitative approaches were used to collect and analyse the data. The sample consisted of 85 students engaged in group projects in the departments of Information Systems, Civil Engineering, Computer Science and Construction Engineering.The results show that mobile phones reduce all four knowledge transfer barriers investigated in the project groups. We found no significant difference in the nature of knowledge shared by teams with weak and strong ties. This suggests that teams with weak social ties who normally experience difficulty sharing complex (tacit knowledge can easily do so with the aid of mobile facilities. In addition, frequent users of mobile phones were motivated to share explicit knowledge with their peers whilst those who often work with tacit knowledge could convert it to explicit form and share it with others. Mobile features like short messaging

  18. Document Management Projects: implementation guide

    Directory of Open Access Journals (Sweden)

    Beatriz Bagoin Guimarães

    2016-12-01

    Full Text Available Records Management System implementation is a complex process that needs to be executed by a multidisciplinary team and involves components of apparently non-related areas such as archival science, computer engineering, law, project management and human resource management. All of them are crucial and complementary to guarantee a full and functional implementation of a system and a perfect fusion with the connected processes and procedures. The purpose of this work is to provide organizations with a basic guide to Records Management Project implementation beginning with the steps prior to acquiring the system, following with the main project activities and concluding with the post implementation procedures of continuous improvement and system maintenance.

  19. Quality assurance project plan for the Chestnut Ridge Fly Ash Pond Stabilization Project at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1996-07-01

    The Chestnut Ridge Fly Ash Pond Stabilization (CRFAPS) Project will stabilize a 19-m-high (62-ft-high) earthen embankment across Upper McCoy Branch situated along the southern slope of Chestnut Ridge. This task will be accomplished by raising the crest of the embankment, reinforcing the face of the embankment, removing trees from the face and top of the embankment, and repairing the emergency spillway. The primary responsibilities of the team members are: Lockheed Martin Energy Systems, Inc., (Energy Systems) will be responsible for project integration, technical support, Title 3 field support, environmental oversight, and quality assurance (QA) oversight of the project; Foster Wheeler Environmental Corporation (FWENC) will be responsible for design and home office Title 3 support; MK-Ferguson of Oak Ridge Company (MK-F) will be responsible for health and safety, construction, and procurement of construction materials. Each of the team members has a QA program approved by the US Department of Energy (DOE) Oak Ridge Operations. This project-specific QA project plan (QAPP), which is applicable to all project activities, identifies and integrates the specific QA requirements from the participant's QA programs that are necessary for this project

  20. Portfolio Assessment of an Undergraduate Group Project

    Science.gov (United States)

    Kuisma, Raija

    2007-01-01

    Students in the Physiotherapy Programme carried out a group project in their final year of studies. The objectives of the project were that the students learn and appreciate the process and activities involved in research, acquire deeper understanding of a topic in their professional interest, learn to work as a team, manage their own time,…

  1. IDC Reengineering Phase 2 Project Scope.

    Energy Technology Data Exchange (ETDEWEB)

    Harris, James M. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2015-02-01

    This report provides a brief description of the scope of the IDC Reengineering Phase 2 project. It describes the goals and objectives of reengineering, the system definition, and the technical scope of the system. REVISIONS Version Date Author/Team Revision Description Authorized by 1.0 9/25/2014 SNL IDC Reengineering Team Unlimited Release for I2 M. Harris 1.1 28/01/2015 IDC Reengineering Team Align with previous IDC scope document E. Tomuta.

  2. JAERI-KEK joint project on high intensity proton accelerators

    International Nuclear Information System (INIS)

    Nagamiya, Shoji

    2000-01-01

    Japan Atomic Energy Research Institute (JAERI) and the High Energy Accelerator Organization (KEK) are promoting the joint project integrating both the Neutron Science Project (NSP) of JAERI and the Japan Hadron Facility Project (JHF) of KEK for comprehensive studies on basic science and technology using high-intensity proton accelerator. This paper describes the joint project prepared by the Joint Project Team of JAERI and KEK to construct accelerators and research facilities necessary both for the NSP and the JHF at the site of JAERI Tokai Establishment. (author)

  3. A New Project-Based Curriculum of Design Thinking with Systems Engineering Techniques

    NARCIS (Netherlands)

    Haruyama, S.; Kim, S.K.; Beiter, K.A.; Dijkema, G.P.J.; De Weck, O.L.

    2012-01-01

    We developed a new education curriculum called "ALPS" (Active Learning Project Sequence) at Keio University that emphasizes team project-based learning and design thinking with systems engineering techniques. ALPS is a 6 month course, in which students work as a team and design and propose

  4. Investigating the extent to which mobile phones reduce Knowledge Transfer barriers in Student Project Teams

    Directory of Open Access Journals (Sweden)

    Michael E. Kyobe

    2011-10-01

    Institutions of learning are increasingly adopting information and communication technologies (e.g. mobile technologies to provide solutions to the challenges facing them. Whilst the integration of the mobile context and technologies in learning environment has been encouraged over the years, and indeed many students today can use mobile phones, the effectiveness of these technologies in reducing impediments to knowledge transfer in group learning has not been investigated. This study investigated the extent to which mobile phones reduce the barriers to knowledge transfer in project groups. The impediments examined include the nature of knowledge, social barriers, lack of time and lack of motivation. Quantitative and qualitative approaches were used to collect and analyse the data. The sample consisted of 85 students engaged in group projects in the departments of Information Systems, Civil Engineering, Computer Science and Construction Engineering. The results show that mobile phones reduce all four knowledge transfer barriers investigated in the project groups. We found no significant difference in the nature of knowledge shared by teams with weak and strong ties. This suggests that teams with weak social ties who normally experience difficulty sharing complex (tacit knowledge can easily do so with the aid of mobile facilities. In addition, frequent users of mobile phones were motivated to share explicit knowledge with their peers whilst those who often work with tacit knowledge could convert it to explicit form and share it with others. Mobile features like short messaging service and multimedia messaging service (SMS & MMS or what some people refer to as ‘texting’, and email were mainly used to share knowledge and were perceived to reduce knowledge transfer time more than voice facilities. Our findings indicate that most students do not utilise the affordances of mobile phones for tacit knowledge transfer. Sharing of tacit knowledge needs to be encouraged

  5. Multi-Agent Modeling in Managing Six Sigma Projects

    Directory of Open Access Journals (Sweden)

    K. Y. Chau

    2009-10-01

    Full Text Available In this paper, a multi-agent model is proposed for considering the human resources factor in decision making in relation to the six sigma project. The proposed multi-agent system is expected to increase the acccuracy of project prioritization and to stabilize the human resources service level. A simulation of the proposed multiagent model is conducted. The results show that a multi-agent model which takes into consideration human resources when making decisions about project selection and project team formation is important in enabling efficient and effective project management. The multi-agent modeling approach provides an alternative approach for improving communication and the autonomy of six sigma projects in business organizations.

  6. Nurse managers' challenges in project management.

    Science.gov (United States)

    Suhonen, Marjo; Paasivaara, Leena

    2011-11-01

    To analyse the challenges that nurse managers meet in project management. Project management done by nurse managers has a significant role in the success of projects conducted in work units. The data were collected by open interviews (n = 14). The participants were nurse managers, nurses and public health nurses. Data analysis was carried out using qualitative content analysis. The three main challenges nurse managers faced in project management in health-care work units were: (1) apathetic organization and management, (2) paralysed work community and (3) cooperation between individuals being discouraged. Nurse managers' challenges in project management can be viewed from the perspective of the following paradoxes: (1) keeping up projects-ensuring patient care, (2) enthusiastic management-effective management of daily work and (3) supporting the work of a multiprofessional team-leadership of individual employees. It is important for nurse managers to learn to relate these paradoxes to one another in a positive way. Further research is needed, focusing on nurse managers' ability to promote workplace spirituality, nurse managers' emotional intelligence and their enthusiasm in small projects. © 2011 Blackwell Publishing Ltd.

  7. I-15 integrated corridor management system : project management plan.

    Science.gov (United States)

    2011-06-01

    The Project Management Plan (PMP) assists the San Diego ICM Team by defining a procedural framework for : management and control of the I-15 Integrated Corridor Management Demonstration Project, and development and : deployment of the ICM System. The...

  8. How Configuration Management (CM) Can Help Project Teams To Innovate and Communicate

    Science.gov (United States)

    Cioletti, Louis

    2009-01-01

    Traditionally, CM is relegated to a support role in project management activities. CM s traditional functions of identification, change control, status accounting, and audits/verification are still necessary and play a vital role. However, this presentation proposes CM s role in a new and innovative manner that will significantly improve communication throughout the organization and, in turn, augment the project s success. CM s new role is elevated to the project management level, above the engineering or sub-project level in the Work Breakdown Structure (WBS), where it can more effectively accommodate changes, reduce corrective actions, and ensure that requirements are clear, concise, and valid, and that results conform to the requirements. By elevating CM s role in project management and orchestrating new measures, a new communication will emerge that will improve information integrity, structured baselines, interchangeability/traceability, metrics, conformance to standards, and standardize the best practices in the organization. Overall project performance (schedule, quality, and cost) can be no better than the ability to communicate requirements which, in turn, is no better than the CM process to communicate project decisions and the correct requirements.

  9. Project Termination from a Benefit Realisation Management Approach : An abductive study of IT and R&D projects

    OpenAIRE

    Franco Gonzalez, Jose Miguel; Luzuriaga Ubilla, Daniela Lorena

    2018-01-01

    Bad or failing projects drain organisational resources in vain, affect team morale,and are a detriment to corporate strategy. Theimportance of terminating a project that will not deliver as promised canhardly be overemphasized, however it is still a major managerial challenge. Throughout this papera call is made toidentify andterminate failing projectsvia a benefit realisation management process, as successful projectsare only those thatdeliver the expected benefits. Thus, the research questi...

  10. READINGS FROM THE FORMAL DISCOURSE OF PROJECT MANAGERS REGARDING DIVERSITY IN TEAMS

    Directory of Open Access Journals (Sweden)

    Sandra Regina da Rocha-Pinto

    2012-04-01

    Full Text Available Based on the viewpoint of project managers with regards to diversity, this paper used a phenomenographic method. Fifteen project managers were interviewed. The latter focused primarily on the variety of techniques, rather than on varieties of any other kind. This view of diversity extends beyond those angles generally taken in the literature on the theme which in most instances refer to diversity as based on gender, race and disadvantaged ethnic and minority groups. Additionally, the study brings to light the fact that diversities of knowledge and behavior are as beneficial for the development of projects. Furthermore, communication and the role of the project manager were raised as mitigating factors when it came to diversity. And, lastly, the conclusion arrived at was that project managers have similar discourses which correspond to the recommendation of the main project management manuals. These discourses and forms of expression are in most cases ready-made.

  11. The joint project for high-intensity proton accelerators

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-08-01

    Japan Atomic Energy Research Institute (JAERI) and the High Energy Accelerator Research Organization (KEK) agreed to promote the joint project integrating both the Neutron Science Project (NSP) of JAERI and the Japan Hadron Facility Project (JHF) of KEK for comprehensive studies on basic science and technology using high-intensity proton accelerator. This document describes the joint proposal prepared by the Joint Project Team of JAERI and KEK to construct accelerators and research facilities necessary both for the NSP and the JHF at the site of JAERI Tokai Establishment. (author)

  12. Multivariate Analysis of Students Perception on Teaching with Client Based and Non-Client Based Team Projects

    Directory of Open Access Journals (Sweden)

    Philip Appiah-Kubi

    2018-05-01

    Full Text Available The classroom experience has evolved from traditional lecture, PowerPoint and whiteboards to a more active environment where students and instructors work together more on hands-on activities to achieve the course objectives. Various names have been given to this pedagogy; experiential learning, project-based learning, active learning, problem-based learning are a handful of names used to describe this evolving pedagogy. The main challenge faced by educators in educating undergraduate students to be independent thinkers and problem solvers, has been the driving force fueling the shift in pedagogy. The skill sets needed to be successful in the workforce has also evolved over the years. Today’s employees are not only expected to demonstrate proficiency in green skills in their field of study, but must also possess soft skills required to be competitive in the industry. Gone are the days where engineers worked in silos applying their green skills to create for the common good. To be productive, employers expect today’s engineer to demonstrate the ability to work in teams, communicate effectively, while applying the technical and analytical know-how needed to achieve a desired goal. To ensure that undergraduate students have these desired skills, most engineering educators have shifted away from the traditional all lecture classes and are applying active learning pedagogies. This research looks into student’s perception on project-based learning with client based and non-client based projects in terms of: the project as a learning device, contribution to research knowledge, motivation to learn, contribution to skills and personal benefits, and their effects on student evaluation of teaching and motivation to learn.

  13. Efficient Project Delivery Using Lean Principles - An Indian Case Study

    Science.gov (United States)

    Kovvuri, P. Ramachandra Reddy; Sawhney, Anil; Ahuja, Ritu; Sreekumar, Aiswarya

    2016-03-01

    Construction industry in India is growing at a rapid pace. Along with this growth, the industry is facing numerous challenges that are making delivery of projects inefficient. Experts believe that capacity constraints in the industry need to be addressed immediately. Government has recommended `introduction of efficient technologies and modern management techniques' to increase the productivity of the industry. In this context, lean principles can act as a lever to make project delivery more efficient and provide the much needed impetus to the Indian construction sector. Around the globe lean principles are showing positive results on the projects. Project teams are reporting improvements in construction time, cost and quality along with softer benefits of enhanced collaboration, coordination and trust in project teams. Can adoption of lean principles provide similar benefits in the Indian construction sector? This research was conducted to answer this question. Using an action research approach a key lean construction tool called Last Planner System (LPS) was tested on a large Indian construction project. The work described in this work investigates the improvements achieved in project delivery by adopting LPS in Indian construction sector. Comparison in pre- and post-implementation data demonstrates increase in the certainty of work-flow and improves schedule compliance. This is measured through a simple LPS metric called percent plan complete. Explicit improvements in schedule performance are seen during 8 week LPS implementation along with implicit improvements in coordination, collaboration and trust in the project team. This work reports the findings of LPS implementation on the case study project outlining the barriers and drivers to adoption, strategies needed to ensure successful implementation and roadmap for implementation. Based on the findings the authors envision that lean construction can make project delivery more efficient in India.

  14. A description of the PISC project

    International Nuclear Information System (INIS)

    1979-01-01

    This report, written as an historical review of the Plate Inspection Steering Committee project, records the background of the project and refers in general to the reasons why decisions were made during the four years the project has been running. Details are given in further reports, of which the full list, issued by the Commission of the European Communities, is as follows: Report no.1 - A description of the PISC project. Report no.2 - Ultrasonic examination of the PVRC plates nos. 50/52, 51/53 and 204. Report no.3 - Destructive examination of the PVRC plates nos. 50/52, 51/53 and 204. Report no.4 - Analysis scheme of the PISC trials results. Report no.5 - Evaluation of the PISC trials results. A list of all participants is given. Data and results of the test programme are detailed in the other reports above, but to maintain confidentiality of data the individual teams have been allocated a code number known only to the team and the PISC management. Data are only identified against code numbers. A report on conclusions and recommendations of the whole PISC programme will be published by the OECD-Committee on the Safety of Nuclear Installations (CSNI) and presented at its annual meeting 1979

  15. The European Union's four-man team of experts attending a demonstration of the DataGrid Project at CERN in early February.

    CERN Multimedia

    2003-01-01

    The DataGrid Project is reviewed by a team of European experts on a yearly basis. At the beginning of February it passed the second of these reviews with flying colours, the four experts issuing enthusiastic statements on the latest progress made, which was quite considerable in 2002.

  16. Project HealthDesign: enhancing action through information.

    Science.gov (United States)

    Brennan, Patricia Flatley; Casper, Gail; Downs, Stephen; Aulahk, Veenu

    2009-01-01

    Project HealthDesign is a country-wide initiative in the United States designed to stimulate innovation in personal health records (PHRs). Nine grantee teams engaged in an 18-month long design and prototyping process. Two teams addressed the needs of children and adolescents; three created novel approaches to help adults prevent or manage metabolic syndrome; three groups employed interface innovations to assist patients with chronic care management and one team devised a novel calendaring system to assist patients undergoing complex medical/surgical treatments to integrate care processes into their daily lives. These projects not only included development and testing of novel personal health records applications, but also served as the starting point to specify and implement a common technical core platform. The project advanced PHR development in two key ways: intensive user-centered design and a development architecture that separates applications of PHRs from the infrastructure that supports them. The initiative also allowed systematic investigation of significant ethical, legal and social issues, including how privacy considerations are changed when information technology innovations are used in the home and the rebalancing of the authority structure of health care decision making when patient-centered approaches guide the design of PHRs.

  17. Project as a System and its Management

    Directory of Open Access Journals (Sweden)

    Jiří Skalický

    2017-06-01

    Full Text Available The contribution aims to describe project as a system, to define project control goal and strategy, control variables and their relationships. Three common control variables represented by the project triangle, are extended by two other important variables – project risk and quality. The control system consists of two components: social one – project manager and project team – and technical one – project dynamic simulation model as a decision making support of project manager in project milestones. In the project planning phase, the project baseline with planned controlled variables is created. In milestones after project launch, the actual values of these variables are measured. If the actual values deviate from planned ones, corrective actions are proposed and new baseline for the following control interval is created. Project plan takes into account the actual project progress and optimum corrective actions are determined by simulation, respecting control strategy and availability of resources. The contribution presents list of references to articles dealing with project as a system and its simulation. In most cases, they refer to the project control using the Earned Value Management method and its derivatives. Using of the dynamic simulation model for project monitoring and control, suggested in this contribution, presents a novel approach. The proposed model can serve as departure point to future research of authors and for development of appropriate and applicable tool.

  18. Research 0n Incentive Mechanism of General Contractor and Subcontractors Dynamic Alliance in Construction Project Based on Team Cooperation

    Science.gov (United States)

    Yin, Honglian; Sun, Aihua; Liu, Quanru; Chen, Zhiyi

    2018-03-01

    It is the key of motivating sub-contractors working hard and mutual cooperation, ensuring implementation overall goal of the project that to design rational incentive mechanism for general contractor. Based on the principal-agency theory, the subcontractor efforts is divided into two parts, one for individual efforts, another helping other subcontractors, team Cooperation incentive models of multiple subcontractors are set up, incentive schemes and intensities are also given. The results show that the general contractor may provide individual and team motivation incentives when subcontractors working independently, not affecting each other in time and space; otherwise, the general contractor may only provide individual incentive to entice teams collaboration between subcontractors and helping each other. The conclusions can provide a reference for the subcontract design of general and sub-contractor dynamic alliances.

  19. Configurable Project Collaboration Portal, Phase I

    Data.gov (United States)

    National Aeronautics and Space Administration — SplashNote Systems is proposing to develop a more effective and innovative approach to project collaboration in distributed teams. The proposed system uniquely gives...

  20. Advanced engineering environment collaboration project.

    Energy Technology Data Exchange (ETDEWEB)

    Lamph, Jane Ann; Pomplun, Alan R.; Kiba, Grant W.; Dutra, Edward G.; Dankiewicz, Robert J.; Marburger, Scot J.

    2008-12-01

    The Advanced Engineering Environment (AEE) is a model for an engineering design and communications system that will enhance project collaboration throughout the nuclear weapons complex (NWC). Sandia National Laboratories and Parametric Technology Corporation (PTC) worked together on a prototype project to evaluate the suitability of a portion of PTC's Windchill 9.0 suite of data management, design and collaboration tools as the basis for an AEE. The AEE project team implemented Windchill 9.0 development servers in both classified and unclassified domains and used them to test and evaluate the Windchill tool suite relative to the needs of the NWC using weapons project use cases. A primary deliverable was the development of a new real time collaborative desktop design and engineering process using PDMLink (data management tool), Pro/Engineer (mechanical computer aided design tool) and ProductView Lite (visualization tool). Additional project activities included evaluations of PTC's electrical computer aided design, visualization, and engineering calculations applications. This report documents the AEE project work to share information and lessons learned with other NWC sites. It also provides PTC with recommendations for improving their products for NWC applications.

  1. Advanced engineering environment collaboration project

    International Nuclear Information System (INIS)

    Lamph, Jane Ann; Pomplun, Alan R.; Kiba, Grant W.; Dutra, Edward G.; Dankiewicz, Robert J.; Marburger, Scot J.

    2008-01-01

    The Advanced Engineering Environment (AEE) is a model for an engineering design and communications system that will enhance project collaboration throughout the nuclear weapons complex (NWC). Sandia National Laboratories and Parametric Technology Corporation (PTC) worked together on a prototype project to evaluate the suitability of a portion of PTC's Windchill 9.0 suite of data management, design and collaboration tools as the basis for an AEE. The AEE project team implemented Windchill 9.0 development servers in both classified and unclassified domains and used them to test and evaluate the Windchill tool suite relative to the needs of the NWC using weapons project use cases. A primary deliverable was the development of a new real time collaborative desktop design and engineering process using PDMLink (data management tool), Pro/Engineer (mechanical computer aided design tool) and ProductView Lite (visualization tool). Additional project activities included evaluations of PTC's electrical computer aided design, visualization, and engineering calculations applications. This report documents the AEE project work to share information and lessons learned with other NWC sites. It also provides PTC with recommendations for improving their products for NWC applications

  2. A Project Management Approach to M&A Deals and their Post-Integration Projects : A Case Study

    OpenAIRE

    Habibbeigi, Pooria

    2010-01-01

    Mergers and acquisitions (M&A) projects have long been considered as a strategy for organizational growth and gain of market share. Top management teams of companies take M&As into consideration since it is faster and less costly compare to internal growth and development programs. M&A project has variety of benefits such as growth in market share, increase in shareholder wealth, access to new markets, technological advantages and so on and so forth. Another benefit of such projec...

  3. Project-Method Fit: Exploring Factors That Influence Agile Method Use

    Science.gov (United States)

    Young, Diana K.

    2013-01-01

    While the productivity and quality implications of agile software development methods (SDMs) have been demonstrated, research concerning the project contexts where their use is most appropriate has yielded less definitive results. Most experts agree that agile SDMs are not suited for all project contexts. Several project and team factors have been…

  4. Problem based Learning versus Design Thinking in Team based Project work

    DEFF Research Database (Denmark)

    Denise J. Stokholm, Marianne

    2014-01-01

    project based learning issues, which has caused a need to describe and compare the two models; in specific the understandings, approaches and organization of learning in project work. The PBL model viewing the process as 3 separate project stages including; problem analysis, problem solving and project......All educations at Aalborg University has since 1974 been rooted in Problem Based Learning (PBL). In 1999 a new education in Industrial design was set up, introducing Design Based Learning (DBL). Even though the two approaches have a lot in common they also hold different understandings of core...... report, with focus on problem solving through analysis. Design Based Learning viewing the process as series of integrated design spaces including; alignment, research, mission, vision, concept, product and process report, with focus on innovative ideation though integration. There is a need of renewing...

  5. Setup and organisation of a NDA-system procurement project

    International Nuclear Information System (INIS)

    Botte, John; Gielen, Paul

    2007-01-01

    Belgoprocess is momentarily in the process of purchasing its fifth NDA-system. Measurement systems are, although based on general designs, not from the shelf items but tailor-made sophisticated and highly automated devices. It is obvious that such a project cannot be carried out by solely a NDA team, but needs a multifunctional team. This team combines NDA expertise with experts in civil works, electrical and mechanical engineering, procurement, IT, safety and legal administration. From less positive experiences in the past, Belgoprocess learned a lot and has now a systematic in place. This systematic structures the project from definition of requirements to operation, a two to three year process. This paper defines the phases of a NDA project and gives for each phase some do's and don'ts. A second subject is the writing and handling of the vast but needed and required documentation. It gives a brief overview of the over thirty documents and files needed. The described, integrated and formal approach reduces the risk of failing projects, systems not meeting the expectations or denied qualification. It puts clear agreements in place, smoothening the relationship between company, supplier and authorities. (authors)

  6. Saving gas project

    Energy Technology Data Exchange (ETDEWEB)

    Vasques, Maria Anunciacao S. [PETROBRAS S.A., Rio de Janeiro, RJ (Brazil); Garantizado, Maria Auxiliadora G. [CONCREMAT Engenharia, Rio de Janeiro, RJ (Brazil)

    2009-12-19

    The work presented was implemented in municipalities around the construction of the pipeline project Urucu-Coari-Manaus, the Engineering / IETEG-IENOR, because of the constant release of workers, consequently the finishing stages of this work and its future completion. The Project aims to guide saving gas with the workforce, their families and communities to the enterprise of small business cooperatives and solidarity within the potential of the site. This project is developed through the workshops: entrepreneur ship, tourism, use, reuse and recycling of products, and hortifruiti culture, agroecology, agribusiness (cooperativism solidarity) and forestry. Its execution took place in two phases, the first called 'pilot' of 12/12/2007 to 27/03/2008 in sections A and B1, in the municipality of Coari stretch and B2 in Caapiranga. The second phase occurred from 30/06 to 27/09/08, in the words B1, in the municipalities of Codajas and Anori words and B2 in Iranduba, Manacapuru and Anama. The workshops were held in state and municipal schools and administered by the Institute of Social and Environmental Amazon - ISAM, which had a team of coordinators, teachers, experts and masters of the time until the nineteen twenty-two hours to implement the project. (author)

  7. Sustainable Relations in International Development Cooperation Projects: The Role of Organizational Climate

    Directory of Open Access Journals (Sweden)

    Cosimo Rota

    2011-10-01

    Full Text Available  The importance of the human side of project management to assess the success of international development project has not been fully considered yet. An analysis of the literature on the project success definition, focused on the success criteria and success factors, was carried out. The organization’s effectiveness, in terms of Relations Sustainability, emerged as a criteria integrating the "time, cost, performance" approach to define a project success. Based on previous research contributions on the factors influencing the organization’s effectiveness, the paper expands the analysis of the influence of Organizational Climate on the Relation Sustainability between project manager and project team involved in international cooperation for development. The statistical methods used include confirmatory factors analysis and structural equation modeling. The results carry implications for project management identifying five dimensions of Organizational Climate (trust, innovation, social cohesion, communication and job challenge influencing Relations Sustainability. This finding suggests that Organizational Climate contributes to project success by creating trust, stimulating commitment and generating satisfaction to overcome conflicts between project manager and project team.

  8. PROJECT SCOPE MANAGEMENT PROCESS

    Directory of Open Access Journals (Sweden)

    Yana Derenskaya

    2018-01-01

    Full Text Available The purpose of the article is to define the essence of project scope management process, its components, as well as to develop an algorithm of project scope management in terms of pharmaceutical production. Methodology. To carry out the study, available information sources on standards of project management in whole and elements of project scope management in particular are analysed. Methods of system and structural analysis, logical generalization are used to study the totality of subprocesses of project scope management, input and output documents, and to provide each of them. Methods of network planning are used to construct a precedence diagram of project scope management process. Results of the research showed that components of the project scope management are managing the scope of the project product and managing the content of project work. It is the second component is investigated in the presented work as a subject of research. Accordingly, it is defined that project scope management process is to substantiate and bring to the realization the necessary amount of work that ensures the successful implementation of the project (achievement of its goal and objectives of individual project participants. It is also determined that the process of managing the project scope takes into account the planning, definition of the project scope, creation of the structure of project work, confirmation of the scope and management of the project scope. Participants of these subprocesses are: customer, investor, and other project participants – external organizations (contractors of the project; project review committee; project manager and project team. It is revealed that the key element of planning the project scope is the formation of the structure of design work, the justification of the number of works, and the sequence of their implementation. It is recommended to use the following sequence of stages for creating the structure of project work

  9. Are High Achievers Successful in Collaborative Learning? An Explorative Study of College Students' Learning Approaches in Team Project-Based Learning

    Science.gov (United States)

    Lee, Hye-Jung; Kim, Hyekyung; Byun, Hyunjung

    2017-01-01

    This study analyses how high-achieving students approach team project-based learning (TPBL) and aims to identify the implications and challenges of TPBL practice in higher education. After interviewing 32 high-achieving students and surveying 1022 additional students at a South Korean university, we found that four factors were particularly…

  10. Adapt! – Agile Project Management Supported by Axiomatic Design

    Directory of Open Access Journals (Sweden)

    Weber Jakob

    2017-01-01

    Full Text Available This paper presents a novel approach for the use of Axiomatic Design Theory in combination with agile project management methods like Scrum for an effective, structured and combined product design and development process. Agile project management methods give a guideline how to manage a project, but there is only minor assistance regarding the actual product development process itself. Axiomatic Design can be used to support these methods in this point. In concrete terms, the results of the decomposition process of this theory can be used to formulate and structure the work packages for the agile project managing process. The Independence Axiom of Axiomatic Design Theory has a substantial contribution by ensuring the independence of the work packages which can be assigned to different project team members and can be processed independently by them. The combination of the different methods not only helps to ensure a good design solution but also helps to work more agile within a project team. The here proposed approach is one part of a holistic product design and development process for changeable production units – called Adapt! – and is described within a use case in the automotive sector.

  11. CAUSE AND EFFECT IN PROMOTING A PROJECT

    Directory of Open Access Journals (Sweden)

    SEVERIAN-VLĂDUȚ IACOB

    2013-12-01

    Full Text Available For a project to be considered successful it is necessary, besides a proper coordination, to be also done a good and wide promotion. In view of communication, promotion and maintenance ensures the organization's image. Disturbances occurring in any type of project, as a result of poor promotion, affect the image of the team and highlight the weaknesses in its management. Therefore, the promotion should be permanently monitored and evaluated. Cause-effect analysis is one of the ways we can identify some of nonconformities of the promotion process within a project.

  12. Disconnecting the autopilot in urban water projects

    DEFF Research Database (Denmark)

    Nielsen, Susanne Balslev; Jensen, Marina Bergen; Øhlenschlæger, Ny

    2011-01-01

    How can we motivate urban planners, water utilities and house owners to collaborate about sustainable urban water projects and to aim for solutions that go beyond the narrow perspective of individual stakeholder interests? A concept for framing a multidisciplinary learning process is developed...... the early stages of an urban water project. To realise new sustainable urban water designs a project team will need to engage and get acceptance from internal and external stakeholders, and this calls for communication and social skills rather than technical skills. The paper identifies potential...

  13. The success of international development projects, trust and communication: an African perspective

    Energy Technology Data Exchange (ETDEWEB)

    Diallo, A.; Thuillier, D. [Universite du Quebec a Montreal (Canada). Dept. Management et Technologie

    2005-04-01

    Project success is strongly linked to communication and cooperation between stakeholders. This research explores the relationship between trust and communication and tests the influence of these factors upon project success and success criteria for international development projects financed by multilateral institutions in sub-Saharan Africa. The research analyses the coordinators' perceptions of project success, communication climate and interpersonal relationship between himself and his stakeholders (task manager in the multilateral agency, national supervisor) and within the project team. Data were collected from questionnaires completed by project coordinators of development projects. The statistical analysis confirms that trust and communication between players are proxy variables. Trust between the task manager and the coordinator is the key success factor, whereas team cohesion is the second most important factor. Trust between the coordinator and his national supervisor does not play a prominent role, although the task manager considers significant local autonomy for the coordinator a prerequisite for funding a subsequent phase when the project comes to an end. (author)

  14. Hamline/3M Project: Liaison for Curricular Change

    Science.gov (United States)

    Rundquist, Andy

    2002-03-01

    This project was designed to catalyze curricular changes to better prepare students for the workplace. Industrial managers provided a list of 16 characteristics valued in the workplace: most were NOT related to science course content. The project formed 5 teams each including 3M professionals and students. Each team developed curricular changes in one of the 16 areas. Team goals were to improve skills in communication, data analysis, business/economics, team problem solving, and culture competency. Curricular changes realized include communication skill activities embodied in science courses and faculty communication teaching skill seminars, self learning tools in data analysis, statistics and model building, a new course developed with assistance from 3M personnel focussing on topics directly related to technological industries, high performance team problem solving training/coaching for faculty and workshops for students and faculty relative to importance of cultural competencies in the workplace, and a new course focusing on culture, team problem solving and conflict resolution in the technical workplace. Process for developing and content of curricular changes will be reported.

  15. MicroBooNE project team recognized by Department of Energy | News

    Science.gov (United States)

    Financial Officer Finance Section Office of the Chief Operating Officer Facilities Engineering Services Accelerator Division Accelerator Physics Center Office of the Chief Safety Officer Environment, Safety, Health and Quality Section Office of the Chief Project Officer Office of Project Support Services Office of

  16. The impact of friendship ties on new product development student projects

    DEFF Research Database (Denmark)

    Kylindri, Stamatia; Blanas, George; Tanev, Stoyan

    2013-01-01

    The competition between firms for more effective new product development (NPD) capabilities has posed the research question: what possibilities are there to improve traditional and knowledge based project team organisation by analysing the impact of social relationships between team members......? The authors of this article tested the hypothesis that friendships have a positive impact on project team effectiveness using the cohesion social network metric. The methodology involves a combination of qualitative and quantitative methodologies applicable to social network analysis (SNA) research...

  17. 76 FR 69700 - Klamath National Forest; California; Pumice Vegetation Management Project

    Science.gov (United States)

    2011-11-09

    ... Management Project AGENCY: Forest Service, USDA. ACTION: Notice of intent to prepare an environmental impact.... Grantham, Forest Supervisor, Attn: Ben Haupt, Pumice Vegetation Management Project Team Leader, Goosenest... Management Project will recommend implementation of one of the following: (1) The proposed action; (2) an...

  18. Performance of student software development teams: the influence of personality and identifying as team members

    Science.gov (United States)

    Monaghan, Conal; Bizumic, Boris; Reynolds, Katherine; Smithson, Michael; Johns-Boast, Lynette; van Rooy, Dirk

    2015-01-01

    One prominent approach in the exploration of the variations in project team performance has been to study two components of the aggregate personalities of the team members: conscientiousness and agreeableness. A second line of research, known as self-categorisation theory, argues that identifying as team members and the team's performance norms should substantially influence the team's performance. This paper explores the influence of both these perspectives in university software engineering project teams. Eighty students worked to complete a piece of software in small project teams during 2007 or 2008. To reduce limitations in statistical analysis, Monte Carlo simulation techniques were employed to extrapolate from the results of the original sample to a larger simulated sample (2043 cases, within 319 teams). The results emphasise the importance of taking into account personality (particularly conscientiousness), and both team identification and the team's norm of performance, in order to cultivate higher levels of performance in student software engineering project teams.

  19. Critical success factors in information technology projects

    Directory of Open Access Journals (Sweden)

    Ayesha

    2017-02-01

    Full Text Available The purpose of this study is to determine the critical success factors (CSF of IT projects in Pa-kistan. The identified factors cannot only be functional to exact type IT projects but also to all types of IT projects, their success directly affects the achievement of whole organization. The proposed study of this paper has determined 15 factors influencing the most on the success of IT projects through multiple regression analysis. The survey has disclosed that many CSFs were found related to IT projects but these 15 factors are also the backbone of IT projects. The re-search results obtained clearly indicated that the Leadership Qualities played a significant role in obtaining Top Management support in order to access to resources however, the Leadership Qualities did not play any role on the trained and capable Project Team Members. Besides, it is undoubtedly defined effective communication of the project was established to be influential on the conclusion and contributing factor towards the Success of IT projects in Pakistan. Top Man-agement Support as a whole was not found to play a key role in the IT Project Success.

  20. Developing Communities of Practice around e-Learning and Project Management

    Science.gov (United States)

    Laxton, Ruth; Applebee, Andrelyn Cheryl

    2010-01-01

    In 2007-8 the Australian Catholic University (ACU National), undertook a project to develop new resources to provide training and support in eLearning for staff and students. The project was undertaken by a multidisciplinary team drawn from all six campuses and was led by an externally contracted Project Manager/eLearning specialist. This…

  1. Process competencies in a problem and project based learning environment

    DEFF Research Database (Denmark)

    Du, Xiangyun; Kolmos, Anette

    2006-01-01

    with the expected professional competencies. Based on the educational practice of PBL Aalborg Model, which is characterized by problem-orientation, project-organization and team work, this paper examines the process of developing process competencies through studying engineering in a PBL environment from...... process competencies through doing problem and project based work in teams? 2) How do students perceive their achievement of these process competencies?......Future engineers are not only required to master technological competencies concerning solving problems, producing and innovating technology, they are also expected to have capabilities of cooperation, communication, and project management in diverse social context, which are referred to as process...

  2. Project-Based Laboratory Experiences in Mechanical Engineering

    Directory of Open Access Journals (Sweden)

    Narendra Sharma

    2011-12-01

    Full Text Available In this paper we describe project-based laboratories in Mechanical Engineering designed to provide semester-long team experiences which mimic the real life industrial processes of design, development, testing and optimization. The labs are focused on courses at the sophomore level and thus require special attention to constraints of student backgrounds and experience. This paper describes laboratory projects in Dynamics and Fluid Mechanics.

  3. Positron--Electron Project (PEP)

    International Nuclear Information System (INIS)

    Rees, J.R.

    1977-01-01

    PEP, an 18-GeV electron-positron colliding-beam storage ring facility at SLAC, is being built by a team from LBL and SLAC. Construction is under way and completion is scheduled for Fall of 1979. A summary is given of the design of the facility, and the status of the project is reported

  4. Project Execution Plan Project 98L-EWW-460 Plutonium Stabilization and Handling DOE No. 98-D-453

    International Nuclear Information System (INIS)

    HOLSTEIN, W.A.

    1999-01-01

    This Project Execution Plan (PEP) describes the management methods and responsibilities of the project participants. Project W-460 is sufficiently large to warrant a stand alone PEP. This project specific PEP describes the relationships and responsibilities of the project team and identifies the technical, schedule, and cost baselines that have been established for the project. The Department of Energy (DOE), Hanford Works (Hanford), at Richland, WA., currently does not have a system capable of stabilizing or packaging large quantities of plutonium-bearing solids to meet DOE technical standard DOE-STD-3013-96. This project will allow Hanford to meet this standard by installing stabilization and packaging equipment (SPE). The SPE is capable of stabilizing and packaging the current inventory of greater than 50 percent plutonium-bearing materials currently stored in the Plutonium Finishing Plant's (PFP) vaults into 3013 storage containers. The scope of this project is to procure and install the SPE via a Hanford contract and coordination with the Savannah River Site. In addition, the project will modify PFP vaults and upgrade the PFP Laboratory measurement systems. The Facility infrastructure will be modified to support the new SPE system and the new standardized storage container configuration. Use of this document is described in the Project Hanford Policy and Procedure System under HNF-PRO-1999, Construction Program Conceptual Phase

  5. Optical projects in the Clinic program at Harvey Mudd College

    Science.gov (United States)

    Yang, Q.

    2017-08-01

    Clinic program is the senior capstone program at Harvey Mudd College (HMC). Multidisciplinary and industry-sponsored projects allow a team of students to solve a real-world problem over one academic year. Over its 50 plus years, Clinic program has completed numerous optics related projects. This report gives an overview of the Clinic program, reviews recent optical projects and discusses how this program supports the learning of the HMC engineering students. A few sample optical projects with more details are presented to provide an insight of what challenges that undergraduates can overcome. Students achieve learning within the optics discipline and the related engineering disciplines. The experiences in these optical projects indicate the great potential to bringing optical hands-on projects into the undergraduate level. Because of the general engineering curriculum at HMC, these projects often work the best with a multidisciplinary nature even if the core of the project is optically focused. Students gain leadership training, oral and written communication skills and experiences in team work. Close relationship with the sponsor liaisons allows for the students to gain skills in professional conduct, management of tight schedule and a specified budget, and it well prepares the students to their engineering practice. Optical projects have their own sets of specific challenges, so it needs to be chosen properly to match the undergraduate skill sets such as those of HMC engineering students.

  6. Project Management Approach to Transition of the Miamisburg Closure Project From Environmental Cleanup to Post-Closure Operations

    International Nuclear Information System (INIS)

    Carpenter, C.P.; Marks, M.L.; Smiley, S.L.; Gallaher, D.M.; Williams, K.D.

    2006-01-01

    The U.S. Department of Energy (DOE) used a project management approach to transition the Miamisburg Closure Project from cleanup by the Office of Environmental Management (EM) to post-closure operations by the Office of Legacy Management (LM). Two primary DOE orders were used to guide the site transition: DOE Order 430.1B, Real Property Asset Management, for assessment and disposition of real property assets and DOE Order 413.3, Program and Project Management for Acquisition of Capital Assets, for project closeout of environmental cleanup activities and project transition of post-closure activities. To effectively manage these multiple policy requirements, DOE chose to manage the Miamisburg Closure Project as a project under a cross-member transitional team using representatives from four principal organizations: DOE-LM, the LM contractor S.M. Stoller Corporation, DOE-EM, and the EM contractor CH2M Hill Mound Inc. The mission of LM is to manage the Department's post-transition responsibilities and long-term care of legacy liabilities and to ensure the future protection of human health and the environment for cleanup sites after the EM has completed its cleanup activities. (authors)

  7. Adopt-a-Nonprofit: A Project in Persuasion and Collaboration.

    Science.gov (United States)

    Spears, Lee A.

    1996-01-01

    Describes a project for professional writing classes that teaches effective persuasive writing, as teams of students research local nonprofit or campus service organizations, design projects to address their groups' main needs, and write solicitation letters for donations or volunteers. Discusses potential problems and how students benefit. (SR)

  8. The Use of ICT Platforms to Promote Knowledge Exchange in Project-Based Organisations

    Directory of Open Access Journals (Sweden)

    Priyono Anjar

    2016-12-01

    Full Text Available This study aims to investigate the use of information and communication technology (ICT to support knowledge exchange in project-based organisations. The primary ICT tool investigated in this research is WhatsApp, a messaging application that has been widely used since its introduction. An ethnographic case study method was utilised to analyse qualitative data collected from interviews and focus group discussions. Three projects in an Indonesian university with a duration ranging from 8 months to 2 years were examined as object of investigations. Broadly, the findings show that ICT tools are generally useful in supporting knowledge exchange, which ultimately positively affects project performance. The project teams relied on WhatsApp for the success of the projects. Although face-to-face meetings were rare, team communication was highly intensive, supported by WhatsApp. In addition, managers are encouraged to promote knowledge exchange between team members. Through knowledge exchange, there will be knowledge development, which facilitates the invention of new techniques and methods for promoting project success. The most prominent findings are presented using direct quotations to provide first hand insight from the field. At the end of the paper, recommendations regarding what project managers should do during and after the project has been completed are presented. The recommendations are classified based on the knowledge management life cycle, representing a structured method to manage knowledge in project-based organisations.

  9. Project Progress Assessment Report (PPAR) 2015

    International Nuclear Information System (INIS)

    Sall, Baba

    2015-01-01

    This evaluation reports reviews basic information, output achievement, equipment and human resources, comment and recommendations. It highlights outputs Fully achieved, those which are partially achieved or in progress and also non achieved outputs. Regarding comments and lessons learned, counterpart stated that the overall timeline of the project is respected, even if activities are delayed to adapt to technical, financial and human resources constraints. The results obtained are in line with expectations thanks to a rigorously respected scientific approach. The Collegial Coordination of the project (DSV-LNERV-CIRAD) and the TO are in phase on the conduct of the Project the collection of baseline data is a crucial phase in the implementation of tsetse control programs. It makes it possible to implement a good strategy. The scientific and technical rigor and the good atmosphere within the Project team are also to be retained.

  10. Project Progress Assessment Report (PPAR) 2012

    International Nuclear Information System (INIS)

    Sall, Baba

    2012-01-01

    This evaluation reports reviews basic information, output achievement, equipment and human resources, comment and recommendations. It highlights outputs Fully achieved, those which are partially achieved or in progress and also non achieved outputs. Regarding comments and lessons learned, counterpart stated that the overall timeline of the project is respected, even if activities are delayed to adapt to technical, financial and human resources constraints. The results obtained are in line with expectations thanks to a rigorously respected scientific approach. The Collegial Coordination of the project (DSV-LNERV-CIRAD) and the TO are in phase on the conduct of the Project the collection of baseline data is a crucial phase in the implementation of tsetse control programs. It makes it possible to implement a good strategy. The scientific and technical rigor and the good atmosphere within the Project team are also to be retained.

  11. Microbial Murders Crime Scene Investigation: An Active Team-Based Learning Project that Enhances Student Enthusiasm and Comprehension of Clinical Microbial Pathogens.

    Science.gov (United States)

    Steel, J Jordan

    2017-01-01

    Microbial disease knowledge is a critical component of microbiology courses and is beneficial for many students' future careers. Microbiology courses traditionally cover core concepts through lectures and labs, but specific instruction on microbial diseases varies greatly depending on the instructor and course. A common project involves students researching and presenting a disease to the class. This method alone is not very effective, and course evaluations have consistently indicated that students felt they lacked adequate disease knowledge; therefore, a more hands-on and interactive disease project was developed called Microbial Murders. For this team-based project, a group of students chooses a pathogen, researches the disease, creates a "mugshot" of the pathogen, and develops a corresponding "crime scene," where a hypothetical patient has died from the microbe. Each group gives a presentation introducing the microbial pathogen, signs/symptoms, treatments, and overall characteristics. The students then visit each other's crime scenes to match the pathogen with the correct crime scene by critically thinking through the clues. This project has shown remarkable success. Surveys indicate that 73% of students thought the project helped them understand the material and 84% said it was worth their time. Student participation, excitement, understanding, and application of microbial disease knowledge have increased and are evident through an increase in course evaluations and in student assessment scores. This project is easy to implement and can be used in a wide variety of biology, microbiology, or health classes for any level (middle school through college).

  12. A desk evaluation review of project RAF/9/005 radiation protection development. Project desk evaluation

    International Nuclear Information System (INIS)

    1994-01-01

    The Agency has been assisting member nations through a number of national TC projects in radiation protection and related areas over the years. In addition, a regional project RAF/9/005 - Radiation Protection Development (which is under this review) was approved in 1988, with the aim of assessing existing radiation protection practices in the African Member States in relation to the Agency's new basic safety standards for radiation protection, and to advise Governments on improvements. The project was subsequently extended up to 1994 as an umbrella project to assist all African Member States in the development of appropriate radiation protection services; to co-ordinate the implementation of the relevant national TC projects; and to develop co-operation amongst groups of Member States on a regional and sub-regional basis. Particular emphasis was to be given to manpower development through workshops, seminars and training courses in radiation protection and safety. In parallel thereto, the Agency's Radiation Protection Advisory Teams (RAPATs) visited nineteen African Member States during the period 1986 through 1993, to review and assess their radiation protection activities, identify priorities, and design long-term radiation protection programmes. RAPAT findings and recommendations were considered in drawing up programmes for implementation under project RAF/9/005

  13. Grounded Theory Study of Conflicts in Norwegian Agile Software Projects: The Project Managers’ Perspective

    Directory of Open Access Journals (Sweden)

    Lubna Siddique

    2016-07-01

    Full Text Available This paper aims to explore the process of conflicts in agile software projects. The purpose was to investigate the causes and consequences of these conflicts. For this purpose, we conducted a qualitative study involving agile software projects in Norway. Grounded theory was used to analyze the data and the interview findings are presented using Glaser´s Six C model (context, condition, causes, consequences, contingencies, and covariance. The research findings suggest that there are several causes of conflicts. These include: the role of the product owner, an inexperienced project manager, the customer’s lack of knowledge about methodology organizational hierarchy in public companies, contracting, personal egos, financial issues, not getting the right team. Consequences of conflicts include: decreased productivity, wastage of time and resources, diverted attention from project objectives loss of motivation, poor decision making, loss of communication. Based on interview data, different conflict strategies are suggested and these include appropriately skilled project manager, communication and negotiation, defining clear roles, stakeholder analysis, managing stakeholder´s expectations, discussion, finding the root cause of conflict. Project managers are using these strategies to avoid or resolve conflicts. The competencies required to handle these kind of conflicts are also discussed in the paper, while the implications of theory and practice of conflict management theory are also presented.

  14. Development of a major hydroelectric project in the Pacific Rim

    International Nuclear Information System (INIS)

    Afshar, Y.; Kwiatkowski, R.W.

    1990-01-01

    Developing a major international energy project requires the assembly and close coordination of various factors. Some of the specific factors include identification of the client, specific project identification, establishing the need for the project, identifying the pros and cons of the project, technical and financial feasibility of the project, identifying sources of financing, identifying the competitions, studying possible teaming arrangements, involvement of local firms and representatives, and developing a strategy that will lead to the successful negotiation of the contract. This paper briefly addresses each of the factors

  15. PROJECT-DRIVEN SOFTWARE BUSINESS IN TRANSILVANIA - A CASE STUDY

    Directory of Open Access Journals (Sweden)

    Radu Marius

    2015-07-01

    Full Text Available The fairly low salaries of the IT workers compared to the Western countries, the skills and the location have supported outsourcing become one of the most competitive Romanian sectors. IT sector in Romania maintains a steady growth favoured by outsourcing companies. Moreover Romania is highly competitive when you take into account the level of technical proficiency and soft skills in the country. Romanian labour force can drive relevant projects even in small teams. This case study explores the realty of Romanian IT companies profiles. It presents in comparison two companies bases on organizational and strategic dimensions: project approach orientation, leadership, project value driven, and social responsibility. The corporate goal of the first company presented in the case study - Fortech - is to achieve the best adaptive organizational structure which can sustain its competitive advantage. This advantage results from combination of three main ingredients: scaled up human resource capital, versatile knowledge management and adaptability to customer needs. Fortech manages and administrates and execute their business activities using project management methodologies and practices in order to achieve the strategic goals. On the other hand Dolphin Kiss Company is a “Python boutique agency” created around a single contract and organized on a single project. The project was contracted with a top company from telecommunication industry. The company is a small team of creative software engineers focused on developing a very innovative software business solution. This case study is an empirical qualitative research intended to depict the main differences between two relevant company profiles present in the actual economic context: small team – results oriented – highly skilled VS large structure of outsourcing teams – matrix organized – customer oriented. The case study constructs a space for debates regarding the potential evolution of the

  16. Waste Management Process Improvement Project

    International Nuclear Information System (INIS)

    Atwood, J.; Borden, G.; Rangel, G. R.

    2002-01-01

    The Bechtel Hanford-led Environmental Restoration Contractor team's Waste Management Process Improvement Project is working diligently with the U.S. Department of Energy's (DOE) Richland Operations Office to improve the waste management process to meet DOE's need for an efficient, cost-effective program for the management of dangerous, low-level and mixed-low-level waste. Additionally the program must meet all applicable regulatory requirements. The need for improvement was highlighted when a change in the Groundwater/Vadose Zone Integration Project's waste management practices resulted in a larger amount of waste being generated than the waste management organization had been set up to handle

  17. NOMINATION FOR THE PROJECT MANAGEMENT INSTITUTE (PMI) PROJECT OF THE YEAR AWARD. INTEGRATED DISPOSAL FACILITY (IDF)

    International Nuclear Information System (INIS)

    MCLELLAN, G.W.

    2007-01-01

    permitting, scheduling, costs, stakeholders and technical issues. To meet the customer's needs and deadlines, the project was managed with conscientious discipline and application of sound project management principles in the Project Management Institute's Project Management Body of Knowledge. Several factors contributed to project success. Extensive planning and preparation were conducted, which was instrumental to contract and procurement management. Anticipating issues and risks, CH2M HILL prepared well defined scope and expectations, particularly for safety. To ensure worker safety, the project management team incorporated CH2M HILL's Integrated Safety Management System (ISMS) into the project and included safety requirements in contracting documents and baseline planning. The construction contractor DelHur Industries, Inc. adopted CH2M HILL's safety program to meet the procurement requirement for a comparable ISMS safety program. This project management approach contributed to an excellent safety record for a project with heavy equipment in constant motion and 63,555 man-hours worked. The project manager worked closely with ORP and Ecology to keep them involved in project decisions and head off any stakeholder or regulatory concerns. As issues emerged, the project manager addressed them expeditiously to maintain a rigorous schedule. Subcontractors and project contributors were held to contract commitments for performance of the work scope and requirements for quality, budget and schedule. Another element of project success extended to early and continual involvement of all interested in the project scope. Due to the public sensitivity of constructing a landfill planned for radioactive waste as well as offsite waste, there were many stakeholders and it was important to secure their agreement on scope and time frames. The project had multiple participants involved in quality assurance surveillances, audits and inspections, including the construction contractor, CH2M HILL

  18. 15 MW HArdware-in-the-loop Grid Simulation Project

    Energy Technology Data Exchange (ETDEWEB)

    Rigas, Nikolaos [Clemson Univ., SC (United States); Fox, John Curtiss [Clemson Univ., SC (United States); Collins, Randy [Clemson Univ., SC (United States); Tuten, James [Clemson Univ., SC (United States); Salem, Thomas [Clemson Univ., SC (United States); McKinney, Mark [Clemson Univ., SC (United States); Hadidi, Ramtin [Clemson Univ., SC (United States); Gislason, Benjamin [Clemson Univ., SC (United States); Boessneck, Eric [Clemson Univ., SC (United States); Leonard, Jesse [Clemson Univ., SC (United States)

    2014-10-31

    The 15MW Hardware-in-the-loop (HIL) Grid Simulator project was to (1) design, (2) construct and (3) commission a state-of-the-art grid integration testing facility for testing of multi-megawatt devices through a ‘shared facility’ model open to all innovators to promote the rapid introduction of new technology in the energy market to lower the cost of energy delivered. The 15 MW HIL Grid Simulator project now serves as the cornerstone of the Duke Energy Electric Grid Research, Innovation and Development (eGRID) Center. This project leveraged the 24 kV utility interconnection and electrical infrastructure of the US DOE EERE funded WTDTF project at the Clemson University Restoration Institute in North Charleston, SC. Additionally, the project has spurred interest from other technology sectors, including large PV inverter and energy storage testing and several leading edge research proposals dealing with smart grid technologies, grid modernization and grid cyber security. The key components of the project are the power amplifier units capable of providing up to 20MW of defined power to the research grid. The project has also developed a one of a kind solution to performing fault ride-through testing by combining a reactive divider network and a large power converter into a hybrid method. This unique hybrid method of performing fault ride-through analysis will allow for the research team at the eGRID Center to investigate the complex differences between the alternative methods of performing fault ride-through evaluations and will ultimately further the science behind this testing. With the final goal of being able to perform HIL experiments and demonstration projects, the eGRID team undertook a significant challenge with respect to developing a control system that is capable of communicating with several different pieces of equipment with different communication protocols in real-time. The eGRID team developed a custom fiber optical network that is based upon FPGA

  19. Challenges in Implementing FP7 Projects in the Public Institutions

    Directory of Open Access Journals (Sweden)

    Viorel VULTURESCU

    2012-06-01

    Full Text Available National Authority for Scientific Research (ANCS and Executive Unit for Higher Education, Research and Development and Innovation Funding (UEFISCDI participate to several projects funded under the Framework Programmes, since 1998. The staff from each the two organisations participating in projects are merely the same, typically from “international cooperation” departments. In each of the two organisations, dedicated teams were set and a distinct specialization emerged. In this respect, dedicated procedures and good practices in project management were developed. Even the Framework Programs had different structures and the focused was different (e.g. knowledge creation, EU problem solving, scientific support for policies and programs, etc., the funding instruments (projects were not radically different from a Framework Program to another, so the staff could gain experience in managing this type of projects. Experience and expertise gained during this long period of time led to definition of a general framework within the two institutions and setting up of a general guideline for participation to this type of projects. The main dimensions of this framework are: project team organization, project management process, managing results and risk, organisational framework, good practices, factors which ensure success in project implementation.The paper presents a specific framework for FP 7 project implementation and how this framework is applied by both organisations, a set of rules and procedures that should be followed by any organisation, in particular governmental ones, participating in FP 7 projects and a set of good practices developed by ANCS and UEFISCDI.

  20. Participation of academics with disabilities in science using the example of AKTIF project

    Directory of Open Access Journals (Sweden)

    Ulutas Sinem

    2017-01-01

    Full Text Available This paper discusses the participation in the scientific world by referring to the AKTIF project. It introduces how the research team of AKTIF takes on the problems of academics with disabilities and reflects on the participation in one’s own team. AKTIF project suggests that for a successful outcome of the participation in the academy, conditions of the recruitment process, employment intake, as well as the cooperation within the course of the project should be changed.

  1. Is DevOps another Project Management Methodology?

    Directory of Open Access Journals (Sweden)

    Logica BANICA

    2017-01-01

    Full Text Available In this paper, the authors aim to present the concept of DevOps (Development & Operations, considering its degree of novelty in the area of project management. Firstly, the authors will bring theoretical arguments to support the idea that DevOps is an early-stage methodology, built on the Agile principles, but coming with its own contributions in project management for software development and implementation. Therefore, we believe that after a short time, DevOps will replace its predecessors. Secondly, we experienced this methodology by developing a small project in academic environment by three teams of master students, using VersionOne software. The Conclusions will emphasize the relevance and the future expected effects of DevOps methodology in the project management domain.

  2. Licensing aspects regarding the RBMN project

    International Nuclear Information System (INIS)

    Cuccia, Valeria; Sacramento, Arivaldo M.; Aleixo, Bruna L.; Ferreira, Vinicius V.M.

    2013-01-01

    The licensing process of a waste disposal facility is a complex and demanding undertaking. It proceeds in phases, starting with the site selection and ending many decades later, when the radionuclides decayed and no longer offer possible hazard. That is one of the reasons why the licensing process for the Brazilian repository for low and intermediate level radioactive waste (RBMN Project) is a challenge for all the technicians involved. Besides that, the only national experience associated to this subject arose after a radiological accident in the State of Goias, in 1987. Two different institutions are involved in this licensing process: IBAMA, for environmental licensing, and CNEN, for nuclear licensing. Both of them will evaluate the possible impacts caused by the waste disposal, so it is essential to avoid conflicts and duplications of activities. The RBMN project has different teams for each main activity, and one of them is the Licensing group. This team has been planning the licensing activities for the repository, studying the legal framework and estimating costs and execution time for each step. This paper presents the status of the licensing activities regarding to the RBMN project done by the CNEN staff. (author)

  3. Influences of Government Championship on the Technology Innovation Process at the Project-level

    Science.gov (United States)

    Yue, Xin

    Government support is a popular instrument to foster technology innovation. It can take various forms such as financial aid, tax credits, and technological assistance. Along with the firm characteristics, strategic behavior of the project team, characteristics of the technology and the market, and the regulatory environment, government support influences firms' research and development (R&D) motivations, decision making process, and hence technology development performance. How government support influences the performance in different industries is an important policy and research question. There are many studies on the effectiveness and impacts of government support, mostly at program-level or industry-level. Government Championship is a form of government support distinct from direct financial or technological assistance. Championship includes expressing confidence in the innovation, encouraging others to support the innovation, and persisting under adversity. Championship has been studied as a critical inside factor for innovation success, particularly at project-level. Usually a champion emerged within the organization responsible for the innovation project. However, with the intention to encourage technology development, governments can also play a championship role. Government championship, besides government financial and technological assistance (hereafter "government F&T"), could be one major category of government support to facilitate high-technology innovation. However, there are few studies focusing on the effectiveness of government championship, and how it influences the innovation process. This thesis addresses this question through two studies on high-technology development projects. The first study has tested the effectiveness of government championship on the performance of 431 government sponsored technology innovation projects. Government championship and government F&T, as well as project team strategic behavior, are hypothesized to influence

  4. Agile project management managing for success

    CERN Document Server

    Crowder, James A

    2015-01-01

    Management and enables them to deal with the demands and complexities of modern, agile systems/software/hardware development teams. The book examines the project/program manager beyond the concepts of leadership and aims to connect to employees' sense of identity. The text examines human psychological concepts such as "locus of control," which will help the manager understand their team members' view and how best to manage their "world" contributions. The authors cover new management tools and philosophies for agile systems/software/hardware development teams, with a specific focus on how this

  5. Project management tool

    Science.gov (United States)

    Maluf, David A. (Inventor); Bell, David G. (Inventor); Gurram, Mohana M. (Inventor); Gawdiak, Yuri O. (Inventor)

    2009-01-01

    A system for managing a project that includes multiple tasks and a plurality of workers. Input information includes characterizations based upon a human model, a team model and a product model. Periodic reports, such as a monthly report, a task plan report, a budget report and a risk management report, are generated and made available for display or further analysis. An extensible database allows searching for information based upon context and upon content.

  6. Unfavorable Communications Lead to Conflicts in Building Projects

    DEFF Research Database (Denmark)

    Ussing, Lene Faber; Wandahl, Søren

    2013-01-01

    The building industry in Denmark is accused of moving towards a conflict culture. The aim of this survey is, therefore, to investigate how the parties in the building industry experience this. The study answers the following two questions: Can unfavorable communications in a building project team...... of misunderstanding and conflicts depends on the way of communicating, and the degree of trust between the parties in a building project team depends on how familiar the parties are with each other. The results indicate that the building industry has to seek new ways of working together to obtain a better...... communication and more trust to each other....

  7. Yakima fisheries project spring chinook supplementation monitoring plan

    International Nuclear Information System (INIS)

    Busack, C.; Pearsons, T.; Knudsen, C.; Phelps, S.; Watson, B.; Johnston, M.

    1997-08-01

    The Yakima Fisheries Project (YFP), a key element in the Northwest Power Planning Council's Fish and Wildlife Program, has been in planning for more than ten years. It was initially conceived as, and is still intended to be, a multipurpose project. Besides increasing fish production in the Yakima basin, it is also intended to yield information about supplementation that will be of value to the entire Columbia basin, and hopefully the entire region. Because of this expectation of increased knowledge resulting from the project, a large and comprehensive monitoring program has always been seen as an integral part of the project. Throughout 1996 the Monitoring Implementation and Planning Team (MIPT), an interdisciplinary group of biologists who have worked on the project for several years, worked to develop a comprehensive spring chinook monitoring plan for the project. The result is the present document

  8. Identifying Coordination Problems in Software Development : Finding Mismatches between Software and Project Team Structures

    NARCIS (Netherlands)

    Amrit, Chintan Amrit; van Hillegersberg, Jos; Kumar, Kuldeep

    2012-01-01

    Today’s dynamic and iterative development environment brings significant challenges for software project management. In distributed project settings, “management by walking around” is no longer an option and project managers may miss out on key project insights. The TESNA (TEchnical Social Network

  9. Ensuring effective project management

    International Nuclear Information System (INIS)

    Ward, J.N.

    1980-01-01

    A brief description is given of the organisation methods employed by the Bechtel Power Corporation, in their contract with Mississippi Power and Light Company for the design, construction and procurement activities for the Grand Gulf Nuclear Station. The aim is to ensure effective management, and good communications at all stages of construction, between the project team and the client. (U.K.)

  10. The Grammar Movie Project

    Science.gov (United States)

    Kreutner, Edith

    2015-01-01

    In this case study, I will show how directing a movie on grammar can help students improve their oral skills as well as their language competency, team working and planning skills, and also teach them about learning itself. I will present an innovative teaching project that uses the medium of film to get students engaged with grammar and that aims…

  11.  Project Management as a Global Trend for Organization Work

    DEFF Research Database (Denmark)

    Kampf, Constance

    in multination and global companies, understanding the power of visual rhetoric, genre and writing processes in the context of project management documentation can be an advantage for technical communicators.  In addition, project management tools and online documentation spaces are objects which cross...... Project Management as a Global Trend for Organization Work: Implications for Technical Communication Project Management tools and processes offer a visual approach to producing knowledge about a project in order to complete it.  As project management practices are used with increasing frequency......-cultural teams use to function.  This presentation will explore the potential of Project Management to be tightly integrated in Technical Communication curricula through a communications approach to project management.  Questions for discussion include: How tightly is project management integrated into different...

  12. Exploring the use of computer-mediated video communication in engineering projects in South Africa

    Directory of Open Access Journals (Sweden)

    Meyer, Izak P.

    2016-08-01

    Full Text Available Globally-expanding organisations that are trying to capitalise on distributed skills are increasingly using virtual project teams to shorten product development time and increase quality. These virtual teams, which are distributed across countries, cultures, and time zones, are required to use faster and better ways of interacting. Past research has shown that virtual teams that use computer-mediated communication (CMC instead of face-to-face communication are less cohesive because they struggle with mistrust, controlling behaviour , and communication breakdowns. This study aims to determine whether project practitioners in South Africa perceive virtual teams that use videoconferencing as suffering from the same CMC disadvantages described in past research in other environments; and if they do, what the possible causes could be. This paper reports on a survey of 106 project practitioners in South Africa. The results show that these project practitioners prefer face- to-face communication over CMC, and perceive virtual teams using videoconferencing to be less cohesive and to suffer from mistrust and communication breakdowns, but not from increased conflict and power struggles. The perceived shortcomings of videoconferencing might result from virtual teams that use this medium having less time to build interpersonal relationships.

  13. Hamline/3M Corp. Project: Liason for Curricular Change*

    Science.gov (United States)

    Artz, Jerry L.

    2002-04-01

    This project was designed to catalyze curricular changes to better prepare students for the workplace. Industrial managers provided a list of 16 characteristics valued in the workplace; most were NOT related to science course content. The project formed 5 teams each including 3M professionals and students. Each team developed curricular changes in one of the 16 areas. Team goals were to improve skills in communication, data analysis, business/economics, team problem solving, and cultural competency. Curricular changes realized include communication skill activities embodied in science courses and faculty communication teaching skill seminars; self learning tools in data analysis, statistics and model building; a new course developed with assistance from 3M personnel focusing on topics directly related to technological industries; high performance team problem solving training/coaching for faculty; workshops for students and faculty relative to importance of cultural competencies in the workplace; and a new course focusing on culture, team problem solving and conflict resolution in the technical workplace. Process for developing and content of curricular changes will be reported. *Thanks to: NSF GOALI CHE-99010782

  14. A change in strategy for a CERCLA Removal Action Demolition Project in progress results in overall project enhancements

    International Nuclear Information System (INIS)

    Albertin, M.; Nichols, R.M.; Edwards, D.T.

    1995-01-01

    This paper discusses changes made in a demolition project at the Fernald Environmental Management Project (FEMP), a site on the National Priorities list (NPL), owned by the Department of Energy. The project, to demolish fourteen uranium ore silos and their structure, was based on a Removal Action Work Plan, submitted and approved by the United States Environmental Protection Agency (USEPA), that integrated Comprehensive Environmental Response Compensation and Liability Act (CERCLA) requirements to remove the source of contamination and threat to public health and the environment. After the demolition contractor defaulted at 30% complete, completion of the project by the USEPA deadline was threatened. The recovery plan included re-evaluation of project documents in addition to the schedule. It was determined that re-interpretation of the removal action criteria, including design and Removal Action Work Plan, would eliminate road-blocks, and optimize resources, resulting in project completion by the original deadline even after lost-time in mobilizing another contractor. This presentation will discuss the open-quotes lessons learnedclose quotes by the project team and illustrate how simplification of construction methods resulted in enhancements to the environmental controls, improved material handing, and created a safer work environment

  15. Status report EFF and EAF projects

    International Nuclear Information System (INIS)

    Gruppelaar, H.; Kopecky, J.

    1990-08-01

    The European Fusion File (EFF) project and the associated European Activation File Project (EAF) are sponsored by the European Community's Fusion Technology Programme. The 1st programme is directed to the short-term needs of the NET team, which designs the Next European Torus, while the 2nd program is directed to long-term needs in the development of a Fusion Demonstration Reactor, in particular in connection with the study of low-activation materials. Various European laboratories participate in this project. The programme of the EFF-project is in its 2nd phase, after the successful completion of the EFF-1 data file. The emphasis on the 1st phase was on the improvement of the tritium breeding and neutron multiplication cross sections, while the 2nd phase emphasizes the improvement of a shielding data base. The progress of this 2nd phase is described. (author). 1 tab

  16. Project report - an overview of the project and experiences with project management

    DEFF Research Database (Denmark)

    Jørgensen, Michael Søgaard; Mikkelsen, Bent Egberg

    1996-01-01

    A collection of the project planning and the experiences with project management from the Catering 2000 project.As appendieces articles etc. from journals, newspapers etc. about the project.......A collection of the project planning and the experiences with project management from the Catering 2000 project.As appendieces articles etc. from journals, newspapers etc. about the project....

  17. Industrial Sponsor Perspective on Leveraging Capstone Design Projects to Enhance Their Business

    Science.gov (United States)

    Weissbach, Robert S.; Snyder, Joseph W.; Evans, Edward R., Jr.; Carucci, James R., Jr.

    2017-01-01

    Capstone design projects have become commonplace among engineering and engineering technology programs. These projects are valuable tools when assessing students, as they require students to work in teams, communicate effectively, and demonstrate technical competency. The use of industrial sponsors enhances these projects by giving these projects…

  18. Project management for economical nuclear energy

    International Nuclear Information System (INIS)

    Majerle, P.P.

    2005-01-01

    The price of electricity is significantly influenced by the cost of the initial generation asset. The cost of the initial nuclear generation asset is significantly influenced by the design and construction duration. Negative variations in the cost and duration of actual design and construction have historically impacted the early relative economics of nuclear power generation. Successful management of plant design information will mitigate the risks of the design and construction of future nuclear plants. Information management tools that can model the integrated delivery of large complex projects enable the project owners to accurately evaluate project progress, as well as the economic impact of regulatory, political, or market activities not anticipated in the project execution plan. Significant differences exist in the electrical energy markets, project delivery models, and fuel availability between continents and countries. However, each market and project delivery model is challenged by the need to produce economical electrical energy. The information management system presented in this paper provides a means to capture in a single integrated computerized database the design information developed during plant design, procurement, and construction and to allow this information to be updated and retrieved in real time by all project participants. Utilization of the information management system described herein will enable diverse project teams to rapidly and reliably input, share, and retrieve power plant information, thereby supporting project management's goal to make good on its commitment to the economic promise of tomorrow's nuclear electrical power generation by achieving cost-effective construction. (authors)

  19. Using MBTI for the Success Assessment of Engineering Teams in Project-Based Learning

    Science.gov (United States)

    Rodríguez Montequín, V.; Mesa Fernández, J. M.; Balsera, J. Villanueva; García Nieto, A.

    2013-01-01

    Project-Based Learning (PBL) is a teaching and learning methodology that emphasizes student centered instruction by assigning projects. The students have to conduct significant projects and cope with realistic working conditions and scenarios. PBL is generally done by groups of students working together towards a common goal. Several factors play…

  20. Fast Paced, Low Cost Projects at MSFC

    Science.gov (United States)

    Watson-Morgan, Lisa; Clinton, Raymond

    2012-01-01

    What does an orbiting microsatellite, a robotic lander and a ruggedized camera and telescope have in common? They are all fast paced, low cost projects managed by Marshall Space Flight Center (MSFC) teamed with successful industry partners. MSFC has long been synonymous with human space flight large propulsion programs, engineering acumen and risk intolerance. However, there is a growing portfolio/product line within MSFC that focuses on these smaller, fast paced projects. While launching anything into space is expensive, using a managed risk posture, holding to schedule and keeping costs low by stopping at egood enough f were key elements to their success. Risk is defined as the possibility of loss or failure per Merriam Webster. The National Aeronautics and Space Administration (NASA) defines risk using procedural requirement 8705.4 and establishes eclasses f to discern the acceptable risk per a project. It states a Class D risk has a medium to significant risk of not achieving mission success. MSFC, along with industry partners, has created a niche in Class D efforts. How did the big, cautious MSFC succeed on these projects that embodied the antithesis of its heritage in human space flight? A key factor toward these successful projects was innovative industry partners such as Dynetics Corporation, University of Alabama in Huntsville (UAHuntsville), Johns Hopkins Applied Physics Laboratory (JHU APL), Teledyne Brown Engineering (TBE), Von Braun Center for Science and Innovation (VCSI), SAIC, and Jacobs. Fast Affordable Satellite Technology (FastSat HSV01) is a low earth orbit microsatellite that houses six instruments with the primary scientific objective of earth observation and technology demonstration. The team was comprised of Dynetics, UAHuntsvile, SAIC, Goddard Space Flight Center (GSFC) and VCSI with the United States Air Force Space Test Program as the customer. The team completed design, development, manufacturing, environmental test and integration in

  1. Sustainable assessment of learning experiences based on projects

    Directory of Open Access Journals (Sweden)

    Ignacio TRAVERSO RIBÓN

    2016-05-01

    Full Text Available In a project-based learning experience, the detailed monitoring of the activities in which team members participate can be useful to evaluate their work. Using learning-oriented assessment procedures, supervisors can assess the teamwork abilities with a formative purpose. Evaluation strategies such as self-assessment, peer assessment and co-assessment are often used to make evaluation formative and sustainable. Conducting an assessment strategy is not easy for team members, since they need before to have a reasonable understanding of the evaluation process and criteria. This paper describes a learning-oriented evaluation methodology and an open data framework that can be applied to collaborative project settings. An evaluation rubric and a series of indicators that provide evidences about the developed skills have been elaborated and applied in a small-scale project-based course. Projects were managed and developed with the help of an open source software forge that contains a ticketing tool for planning and tracking of tasks, a version control repository to save the software outcomes, and using a wiki to host text deliverables. The experience provides evidences in favor of using the assessment method and open data framework to make teamwork evaluation more sustainable.

  2. Financing wind projects

    International Nuclear Information System (INIS)

    Manson, J.

    2006-01-01

    This presentation reviewed some of the partnership opportunities available from GE Energy. GE Energy's ecomagination commitment has promised to double research investment, make customers true partners and reduce greenhouse gases (GHGs). GE Energy's renewable energy team provides a broad range of financial products, and has recently funded 30 wind farms and 2 large solar projects. The company has a diverse portfolio of technology providers and wind regimes, and is increasing their investment in technology. GE Energy recognizes that the wind industry is growing rapidly and has received increased regulatory support that is backed by strong policy and public support. It is expected that Canada will have 3006 wind projects either planned or under construction by 2007. According to GE Energy, successful wind financing is dependent on the location of the site and its wind resources, as well as on the wind developer's power sales agreement. The success of a wind project is also determined by clear financing goals. Site-specific data is needed to determine the quality of wind resource, and off-site data can also be used to provide validation. Proximity to load centres will help to minimize capital costs. Power sales agreements should be based on the project's realistic net capacity factor as well as on the cost of the turbines. The economics of many wind farms is driven by the size of the turbines used. Public consultations are also needed to ensure the success of wind power projects. It was concluded that a good partner will have staying power in the wind power industry, and will understand the time-lines and needs that are peculiar to wind energy developers. refs., tabs., figs

  3. Relation of project managers' personality and project performance: An approach based on value stream mapping

    Directory of Open Access Journals (Sweden)

    Maurizio Bevilacqua

    2014-09-01

    Full Text Available Purpose: This work investigates the influence of project managers’ personality on the success of a project in a Multinational Corporation. The methodology proposed for analyzing the project managers’ personality is based on the Myers-Briggs Type Indicator.Design/methodology/approach: Forty projects carried out in 2012 by multinational corporation, concerning new product development (NPD, have been analyzed, comparing the profile of project managers with results obtained in terms of traditional performance indexes (time delay and over-budget of projects and performance indexes usually used in “Lean Production” sector (waste time and type of “wastes”. A detailed analysis of the most important “wastes” during the project development is carried out using the Value Stream Mapping (VSM technique.Findings and Originality/value: Relying on the Myers–Briggs personality instrument, results show that extroverted managers (as opposed to introverted managers carry out projects that show lower delay and lower waste time. Introverted managers often make “Over-processing” and “Defect” types of waste. Moreover, lower delay and over-budget have been shown by perceiving managers.Research limitations: Regarding the limitations of this work it is necessary to highlight that we collected data from project managers in a retrospective way. While we believe that several aspects of our data collection effort helped enhance the accuracy of the results, future research could conduct real-time case study research to get more detailed insights into the proposed relationships and avoid retrospective bias. Moreover we focused on a single respondent, the project manager. This helped us ensure that their interpretations played an important role in product development. But, we cannot examined the opinion of team members that could be different from project managers opinion regarding some questions.Originality/value: This research provides insight useful

  4. A root cause analysis project in a medication safety course.

    Science.gov (United States)

    Schafer, Jason J

    2012-08-10

    To develop, implement, and evaluate team-based root cause analysis projects as part of a required medication safety course for second-year pharmacy students. Lectures, in-class activities, and out-of-class reading assignments were used to develop students' medication safety skills and introduce them to the culture of medication safety. Students applied these skills within teams by evaluating cases of medication errors using root cause analyses. Teams also developed error prevention strategies and formally presented their findings. Student performance was assessed using a medication errors evaluation rubric. Of the 211 students who completed the course, the majority performed well on root cause analysis assignments and rated them favorably on course evaluations. Medication error evaluation and prevention was successfully introduced in a medication safety course using team-based root cause analysis projects.

  5. Integration, Configuration and Coordination: from Project to Reality, at CERN

    CERN Document Server

    Barberan Marin, Maria; Bernardini, Marzia; Birtwistle, Thomas; Chemli, Samy; Corso, Jean-Pierre; Coupard, Julie; Foraz, Katy; Grillot, Serge; Muttoni, Yvon; Perrot, Anne-Laure

    2016-01-01

    The rigorous process in place at CERN to approve and follow-up the implementation of any modification of the LHC machine and its Injectors is presented in this paper. Our methodology implies the support of three teams, in charge of the configuration management, the scheduling and safety coordination, and the 3D integration studies. At each stage of the project the support of the three teams evolves, to provide the adequate support in the preparation phase and during the technical stops and long shutdowns. The formal roles and the processes used to govern the interaction of the Integration, Configuration and Coordination teams, and their relation to the project teams during the preparation and implementation phases, for activities to be performed in LHC and its injector chain are described and discussed.

  6. TIPTOPbase: the Iron Project and the Opacity Project Atomic Database

    Science.gov (United States)

    Mendoza, Claudio; Nahar, Sultana; Pradhan, Anil; Seaton, Micheal; Zeippen, Claude

    2001-05-01

    The Opacity Project, the IRON Project, and the RmaX Network (The Opacity Project Team, Vol.1,2), IOPP, Bristol (1995,1996); Hummer et al., Astron. Astrophys. 279, 298 (1993) are international computational efforts concerned with the production of high quality atomic data for astrophysical applications. Research groups from Canada, France, Germany, UK, USA and Venezuela are involved. Extensive data sets containing accurate energy levels, f-values, A-values, photoionisation cross sections, collision strengths, recombination rates, and opacitites have been computed for cosmically abundant elements using state-of-the-art atomic physics codes. Their volume, completeness and overall accuracy are presently unmatched in the field of laboratory astrophysics. Some of the data sets have been available since 1993 from a public on-line database service referred to as TOPbase (Cunto et al Astron. Astrophys. 275), L5 (1993), ( http://cdsweb.u-strasbg.fr/OP.html at CDS France, and http://heasarc.gsfc.nasa.gov/topbase, at NSAS USA). We are currently involved in a major effort to scale the existing database services to develop a robust platform for the high-profile dissemination of atomic data to the scientific community within the next 12 months. (Partial support from the NSF and NASA is acknowledged.)

  7. Asian Tracer Experiment and Atmospheric Modeling (TEAM) Project: Draft Field Work Plan for the Asian Long-Range Tracer Experiment

    Energy Technology Data Exchange (ETDEWEB)

    Allwine, K Jerry; Flaherty, Julia E.

    2007-08-01

    This report provides an experimental plan for a proposed Asian long-range tracer study as part of the international Tracer Experiment and Atmospheric Modeling (TEAM) Project. The TEAM partners are China, Japan, South Korea and the United States. Optimal times of year to conduct the study, meteorological measurements needed, proposed tracer release locations, proposed tracer sampling locations and the proposed durations of tracer releases and subsequent sampling are given. Also given are the activities necessary to prepare for the study and the schedule for completing the preparation activities leading to conducting the actual field operations. This report is intended to provide the TEAM members with the information necessary for planning and conducting the Asian long-range tracer study. The experimental plan is proposed, at this time, to describe the efforts necessary to conduct the Asian long-range tracer study, and the plan will undoubtedly be revised and refined as the planning goes forward over the next year.

  8. Soft Assembling Project-Based Learning and Leadership in Japan

    Science.gov (United States)

    Knight, Kevin; Murphey, Tim

    2017-01-01

    In this article, we initially focus on how the conceptualization of leadership by Knight (2013a) in his leadership seminars became the basis for choosing a project-based learning (PBL) approach. We then consider how soft assembling can enhance the leadership project activities of student teams and group-work in general classes. Soft assembling…

  9. Deep Help in Complex Project Work: Guiding and Path-Clearing Across Difficult Terrain

    OpenAIRE

    Fisher, Colin M.; Pillemer, Julianna; Amabile, Teresa M.

    2017-01-01

    How do teams working on complex projects get the help they need? Our qualitative investigation of the help provided to project teams at a prominent design firm revealed two distinct helping processes, both characterized by deep, sustained engagement that far exceeds the brief interactions described in the helping literature. Such deep help consisted of (1) guiding a team through a difficult juncture by working with its members in several prolonged, tightly clustered sessions, or (2) path-clea...

  10. Introducing AstroGen: The Astronomy Genealogy Project

    OpenAIRE

    Tenn, Joseph S.

    2016-01-01

    The Astronomy Genealogy Project ("AstroGen"), a project of the Historical Astronomy Division of the American Astronomical Society (AAS), will soon appear on the AAS website. Ultimately, it will list the world's astronomers with their highest degrees, theses for those who wrote them, academic advisors (supervisors), universities, and links to the astronomers or their obituaries, their theses when on-line, and more. At present the AstroGen team is working on those who earned doctorates with ast...

  11. Leader evaluation and team cohesiveness in the process of team development: A matter of gender?

    Directory of Open Access Journals (Sweden)

    Núria Rovira-Asenjo

    Full Text Available Leadership positions are still stereotyped as masculine, especially in male-dominated fields (e.g., engineering. So how do gender stereotypes affect the evaluation of leaders and team cohesiveness in the process of team development? In our study participants worked in 45 small teams (4-5 members. Each team was headed by either a female or male leader, so that 45 leaders (33% women supervised 258 team members (39% women. Over a period of nine months, the teams developed specific engineering projects as part of their professional undergraduate training. We examined leaders' self-evaluation, their evaluation by team members, and team cohesiveness at two points of time (month three and month nine, the final month of the collaboration. While we did not find any gender differences in leaders' self-evaluation at the beginning, female leaders evaluated themselves more favorably than men at the end of the projects. Moreover, female leaders were evaluated more favorably than male leaders at the beginning of the project, but the evaluation by team members did not differ at the end of the projects. Finally, we found a tendency for female leaders to build more cohesive teams than male leaders.

  12. Leader evaluation and team cohesiveness in the process of team development: A matter of gender?

    Science.gov (United States)

    Sczesny, Sabine; Gumí, Tània; Guimerà, Roger; Sales-Pardo, Marta

    2017-01-01

    Leadership positions are still stereotyped as masculine, especially in male-dominated fields (e.g., engineering). So how do gender stereotypes affect the evaluation of leaders and team cohesiveness in the process of team development? In our study participants worked in 45 small teams (4–5 members). Each team was headed by either a female or male leader, so that 45 leaders (33% women) supervised 258 team members (39% women). Over a period of nine months, the teams developed specific engineering projects as part of their professional undergraduate training. We examined leaders’ self-evaluation, their evaluation by team members, and team cohesiveness at two points of time (month three and month nine, the final month of the collaboration). While we did not find any gender differences in leaders’ self-evaluation at the beginning, female leaders evaluated themselves more favorably than men at the end of the projects. Moreover, female leaders were evaluated more favorably than male leaders at the beginning of the project, but the evaluation by team members did not differ at the end of the projects. Finally, we found a tendency for female leaders to build more cohesive teams than male leaders. PMID:29059231

  13. Strategic leadership of portfolio and project management

    CERN Document Server

    Kloppenborg, Timothy J

    2014-01-01

    As an executive in today's economy, your organization may have limited resources and bench strength. How can you and other leaders make the most of your company's assets? This book will instruct you and your leadership teams on implementing strategy through identifying, selecting, prioritizing, resourcing, and governing an optimal combination of projects and other work. Inside, you'll learn how to sponsor every project stage, as well as instruct your project managers and direct reports to follow your lead. Detailed advice is given for project management competency on utilizing input from customers, employees, and processes. Much of your organization's work is probably dependent on information technology and understanding and using information technology as a strategic weapon, and with this book, you'll learn how your organization can become competitive and how to effectively implement smart business strategies. This book outlines how these portfolio and project decisions have to be made based on both qualitat...

  14. Integrating Project Portfolio With Business Strategy: Imagineering

    Directory of Open Access Journals (Sweden)

    Cesar Buaes Dal Maso

    2015-12-01

    Full Text Available Aligning project management to the strategy of a big company is a difficult job. Through Imagineering (the business department and project management program, The Walt Disney Company has done this alignment in an exemplary way. Using a theoretical investigation, this study analyzed the Imagineering as a reference in strategic management of global projects through Disney´s business portfolio, a global benchmarking and with Malmberg et al. (2010 as a company guide. As the main results of the correlations carried out, it was noted that the Imagineers who work in project teams apply tools and techniques with a strategic vision focused on differentiation, generating value, and mixing imagination with technical capacity. The Blue Sky department and its integrated units make possible the creation and deployment of the attractions, the theme parks, hotels, resorts and the Disney sea cruises, demonstrating in this way, to be a highly effective project management office.

  15. NOMINATION FOR THE PROJECT MANAGEMENT INSTITUTE (PMI) PROJECT OF THE YEAR AWARD INTEGRATED DISPOSAL FACILITY (IDF)

    Energy Technology Data Exchange (ETDEWEB)

    MCLELLAN, G.W.

    2007-02-07

    issues as well as challenges with permitting, scheduling, costs, stakeholders and technical issues. To meet the customer's needs and deadlines, the project was managed with conscientious discipline and application of sound project management principles in the Project Management Institute's Project Management Body of Knowledge. Several factors contributed to project success. Extensive planning and preparation were conducted, which was instrumental to contract and procurement management. Anticipating issues and risks, CH2M HILL prepared well defined scope and expectations, particularly for safety. To ensure worker safety, the project management team incorporated CH2M HILL's Integrated Safety Management System (ISMS) into the project and included safety requirements in contracting documents and baseline planning. The construction contractor DelHur Industries, Inc. adopted CH2M HILL's safety program to meet the procurement requirement for a comparable ISMS safety program. This project management approach contributed to an excellent safety record for a project with heavy equipment in constant motion and 63,555 man-hours worked. The project manager worked closely with ORP and Ecology to keep them involved in project decisions and head off any stakeholder or regulatory concerns. As issues emerged, the project manager addressed them expeditiously to maintain a rigorous schedule. Subcontractors and project contributors were held to contract commitments for performance of the work scope and requirements for quality, budget and schedule. Another element of project success extended to early and continual involvement of all interested in the project scope. Due to the public sensitivity of constructing a landfill planned for radioactive waste as well as offsite waste, there were many stakeholders and it was important to secure their agreement on scope and time frames. The project had multiple participants involved in quality assurance surveillances, audits and

  16. Agent-Based Simulations for Project Management

    Science.gov (United States)

    White, J. Chris; Sholtes, Robert M.

    2011-01-01

    Currently, the most common approach used in project planning tools is the Critical Path Method (CPM). While this method was a great improvement over the basic Gantt chart technique being used at the time, it now suffers from three primary flaws: (1) task duration is an input, (2) productivity impacts are not considered , and (3) management corrective actions are not included. Today, computers have exceptional computational power to handle complex simulations of task e)(eculion and project management activities (e.g ., dynamically changing the number of resources assigned to a task when it is behind schedule). Through research under a Department of Defense contract, the author and the ViaSim team have developed a project simulation tool that enables more realistic cost and schedule estimates by using a resource-based model that literally turns the current duration-based CPM approach "on its head." The approach represents a fundamental paradigm shift in estimating projects, managing schedules, and reducing risk through innovative predictive techniques.

  17. Integrating Social and Traditional Media in the Client Project

    Science.gov (United States)

    Melton, James; Hicks, Nancy

    2011-01-01

    Based on a client project assigned to students in two undergraduate business classes, this article argues that social media learning is best done in a context that mixes social media with more traditional kinds of media. Ideally, this approach will involve teams of students who are working on different aspects of a larger client project. This…

  18. Economic viability of Cernavoda project

    International Nuclear Information System (INIS)

    Condu, M.; Popescu, D.; Chirica, T.; Glodeanu, F.

    1998-01-01

    Cernavoda project started in 1978, when the CANDU technology procurement contract and other contracts for engineering, technical assistance and procurement were signed with AECL. The works on site started in 1980. In February 1981, a contract was signed with GE - USA and Ansaldo - Italy for balance of plant. After 1989 the concept for project implementation was essentially changed. The completion of Cernavoda NPP Unit-1, established as the first priority by Romanian authorities was implemented by AECL-Ansaldo Consortium (AAC). The objective of the contract signed with AAC consisted in overtaking the management of Cernavoda Unit-1 project, in order to complete, commission and operate the plant for 18 months. The plant was successfully completed, commissioned and commercially operated since December 2, 1996. As concerns Unit-2, only preservation and some remedial works were performed since 1991. In order to support the decision to complete Unit-2, a complete process was initiated: - identification of the activities and associated costs required for plan completion; - plant integration in the utility's least cost development study; - Unit-2 cash flow analysis. A joint RENEL-AECL-ANSALDO team performed a detailed analysis using Cernavoda Unit-1 as reference project and taking advantage of the experience gained during construction, commissioning and operation of the first unit. The least cost power generation development study finalized by SEP and EDF, based on a PHARE funding, ranked Cernavoda Unit-2 on the second place, after two small hydroelectric plants of 53 and 8 Mw e. A cash flow model developed by a RENEL-ANSALDO joint team shows that Cernavoda Unit-2 is an economically feasible project. The financing scenario provides that all resources will be from loans. Other arguments for completion of Cernavoda Unit-2 are: - good performances in operation of Unit-1; - the need to provide jobs for the specialists in the nuclear field; - opportunity for electricity export

  19. Project Schedule Simulation

    DEFF Research Database (Denmark)

    Mizouni, Rabeb; Lazarova-Molnar, Sanja

    2015-01-01

    overrun both their budget and time. To improve the quality of initial project plans, we show in this paper the importance of (1) reflecting features’ priorities/risk in task schedules and (2) considering uncertainties related to human factors in plan schedules. To make simulation tasks reflect features......’ priority as well as multimodal team allocation, enhanced project schedules (EPS), where remedial actions scenarios (RAS) are added, were introduced. They reflect potential schedule modifications in case of uncertainties and promote a dynamic sequencing of involved tasks rather than the static conventional...... this document as an instruction set. The electronic file of your paper will be formatted further at Journal of Software. Define all symbols used in the abstract. Do not cite references in the abstract. Do not delete the blank line immediately above the abstract; it sets the footnote at the bottom of this column....

  20. NREL/SCE High Penetration PV Integration Project: FY13 Annual Report

    Energy Technology Data Exchange (ETDEWEB)

    Mather, B. A.; Shah, S.; Norris, B. L.; Dise, J. H.; Yu, L.; Paradis, D.; Katiraei, F.; Seguin, R.; Costyk, D.; Woyak, J.; Jung, J.; Russell, K.; Broadwater, R.

    2014-06-01

    In 2010, the National Renewable Energy Laboratory (NREL), Southern California Edison (SCE), Quanta Technology, Satcon Technology Corporation, Electrical Distribution Design (EDD), and Clean Power Research (CPR) teamed to analyze the impacts of high penetration levels of photovoltaic (PV) systems interconnected onto the SCE distribution system. This project was designed specifically to benefit from the experience that SCE and the project team would gain during the installation of 500 megawatts (MW) of utility-scale PV systems (with 1-5 MW typical ratings) starting in 2010 and completing in 2015 within SCE's service territory through a program approved by the California Public Utility Commission (CPUC). This report provides the findings of the research completed under the project to date.

  1. Escalation, de-escalation, or reformulation : effective interventions in delayed NPD projects

    NARCIS (Netherlands)

    Oorschot, van K.E.; Langerak, F.; Sengupta, K.

    2011-01-01

    At the start of any project, new product development (NPD) teams must make accurate decisions about development time, development costs, and product performance. Such profit-maximizing decision making becomes particularly difficult when the project runs behind schedule and requires intervention

  2. Risk management methodology for RBMN project

    International Nuclear Information System (INIS)

    Borssatto, Maria F.B.; Tello, Cledola C.O.; Uemura, George

    2013-01-01

    RBMN Project has been developed to design, construct and commission a national repository to dispose the low- and intermediate-level radioactive wastes from the operation of nuclear power plants and other industries that use radioactive sources and materials. Risk is a characteristic of all projects. The risks arise from uncertainties due to assumptions associated with the project and the environment in which it is executed. Risk management is the method by which these uncertainties are systematically monitored to ensure that the objectives of the project will be achieved. Considering the peculiarities of the Project, that is, comprehensive scope, multidisciplinary team, apparently polemic due to the unknowing of the subject by the stake holders, especially the community, it is being developed a specific methodology for risk management of this Project. This methodology will be critical for future generations who will be responsible for the final stages of the repository. It will provide greater guarantee to the processes already implemented and will maintain a specific list of risks and solutions for this Project, ensuring safety and security of the repository throughout its life cycle that is the planned to last at least three hundred years. This paper presents the tools and processes already defined, management actions aimed at developing a culture of proactive risk in order to minimize threats to this Project and promote actions that bring opportunities to its success. The methodology is based on solid research on the subject, considering methodologies already established and globally recognized as best practices for project management. (author)

  3. One project`s waste is another project`s resource

    Energy Technology Data Exchange (ETDEWEB)

    Short, J.

    1997-02-01

    The author describes the efforts being made toward pollution prevention within the DOE complex, as a way to reduce overall project costs, in addition to decreasing the amount of waste to be handled. Pollution prevention is a concept which is trying to be ingrained into project planning. Part of the program involves the concept that ultimately the responsibility for waste comes back to the generator. Parts of the program involve efforts to reuse materials and equipment on new projects, to recycle wastes to generate offsetting revenue, and to increase awareness, accountability and incentives so as to stimulate action on this plan. Summaries of examples are presented in tables.

  4. Insights into the use and affordances of social and collaborative applications for student projects

    Directory of Open Access Journals (Sweden)

    Omolola Ola Bankole

    2017-10-01

    Full Text Available The use of social and collaborative computing has the potential of assisting learning and improving the ability to work together as part of a team. Team work is a graduate attribute that students need to acquire before transitioning from university into the workplace. The aim of this exploratory research was to provide insights into the use of social and collaborative applications by Computer Science students, and the emergent affordances student project teams have created with the use of these applications. It answers the questions: What elearning platforms or applications do students use to collaborate for team projects? What technology affordance draws students to use these applications? This study adopts affordance theory as the theoretical framework. Two types of content analysis: conventional content analysis and summative content analysis were used to analyse the data. Data was gathered using a pre-designed questionnaire with the teams during the first semester of 2016. Findings show that the university’s elearning platform is utilised for some of their courses; however students seem to prefer free and open source platforms. Student project teams used applications such as WhatsApp, Telegram, Dropbox, Google Drive, Google Docs, as well as email messages, to work jointly, and were successfully able to complete their team projects. Four types of technology affordances: communicative-affordance, document share-affordance, course resource-affordance, and integrity-affordance, were identified as being relevant.

  5. Spent nuclear fuel project high-level information management plan

    Energy Technology Data Exchange (ETDEWEB)

    Main, G.C.

    1996-09-13

    This document presents the results of the Spent Nuclear Fuel Project (SNFP) Information Management Planning Project (IMPP), a short-term project that identified information management (IM) issues and opportunities within the SNFP and outlined a high-level plan to address them. This high-level plan for the SNMFP IM focuses on specific examples from within the SNFP. The plan`s recommendations can be characterized in several ways. Some recommendations address specific challenges that the SNFP faces. Others form the basis for making smooth transitions in several important IM areas. Still others identify areas where further study and planning are indicated. The team`s knowledge of developments in the IM industry and at the Hanford Site were crucial in deciding where to recommend that the SNFP act and where they should wait for Site plans to be made. Because of the fast pace of the SNFP and demands on SNFP staff, input and interaction were primarily between the IMPP team and members of the SNFP Information Management Steering Committee (IMSC). Key input to the IMPP came from a workshop where IMSC members and their delegates developed a set of draft IM principles. These principles, described in Section 2, became the foundation for the recommendations found in the transition plan outlined in Section 5. Availability of SNFP staff was limited, so project documents were used as a basis for much of the work. The team, realizing that the status of the project and the environment are continually changing, tried to keep abreast of major developments since those documents were generated. To the extent possible, the information contained in this document is current as of the end of fiscal year (FY) 1995. Programs and organizations on the Hanford Site as a whole are trying to maximize their return on IM investments. They are coordinating IM activities and trying to leverage existing capabilities. However, the SNFP cannot just rely on Sitewide activities to meet its IM requirements

  6. The JET PCU project: An international plasma control project

    International Nuclear Information System (INIS)

    Sartori, F.; Crisanti, F.; Albanese, R.; Ambrosino, G.; Toigo, V.; Hay, J.; Lomas, P.; Rimini, F.; Shaw, S.R.; Luchetta, A.; Sousa, J.; Portone, A.; Bonicelli, T.; Ariola, M.; Artaserse, G.; Bigi, M.; Card, P.; Cavinato, M.; De Tommasi, G.; Gaio, E.

    2008-01-01

    This paper describes the new JET enhancement project 'Plasma Control Upgrade' (PCU). Initially aimed at an overhaul of JET plasma control capabilities it was eventually focused on improving the vertical stabilisation (VS) system ability to recover from large ELM (edge localised mode) perturbations. The paper describes the results of the first two years where the activity was aimed principally at researching a solution that could be implemented within the timing and budget constraints. A very important task was that of improving the modelling of JET plasma, iron core and passive structures. Using dedicated experiments, the models were progressively refined until it was possible not just to explain the experimental data but predict the VS system behaviour. At the same time the project team studied the best options for power supply (PS) and control system upgrades and evaluated whether a change of turns in the stabilisation coil was desirable and possible. A new fast radial field power supply is now being ordered and the VS control system is being upgraded

  7. Implementing an interprofessional patient safety learning initiative: insights from participants, project leads and steering committee members.

    Science.gov (United States)

    Jeffs, Lianne; Abramovich, Ilona Alex; Hayes, Chris; Smith, Orla; Tregunno, Deborah; Chan, Wai-Hin; Reeves, Scott

    2013-11-01

    Effective teamwork and interprofessional collaboration are vital for healthcare quality and safety; however, challenges persist in creating interprofessional teamwork and resilient professional teams. A study was undertaken to delineate perceptions of individuals involved with the implementation of an interprofessional patient safety competency-based intervention and intervention participants. The study employed a qualitative study design that triangulated data from interviews with six steering committee members and five members of the project team who developed and monitored the intervention and six focus groups with clinical team members who participated in the intervention and implemented local patient safety projects within a large teaching hospital in Canada. Our study findings reveal that healthcare professionals and support staff acquired patient safety competencies in an interprofessional context that can result in improved patient and work flow processes. However, key challenges exist including managing projects amidst competing priorities, lacking physician engagement and sustaining projects. Our findings point to leaders to provide opportunities for healthcare teams to engage in interprofessional teamwork and patient safety projects to improve quality of patient care. Further research efforts should examine the sustainability of interprofessional safety projects and how leaders can more fully engage the participation of all professions, specifically physicians.

  8. Project Success in IT Project Management

    OpenAIRE

    Siddiqui, Farhan Ahmed

    2010-01-01

    The rate of failed and challenged Information Technology (IT) projects is too high according to the CHAOS Studies by the Standish Group and the literature on project management (Standish Group, 2008). The CHAOS Studies define project success as meeting the triple constraints of scope, time, and cost. The criteria for project success need to be agreed by all parties before the start of the project and constantly reviewed as the project progresses. Assessing critical success factors is another ...

  9. Vague project start makes project success of outsourced software development projects uncertain

    OpenAIRE

    Savolainen, Paula

    2010-01-01

    peer-reviewed A definition of a project success includes at least three criteria: 1) meeting planning goals, 2) customer benefits, and 3) supplier benefits. This study aims to point out the importance of the definition of the project start, the project start date, and what work should be included in the project effort in order to ensure the supplier's benefits. The ambiguity of the project start risks the profitability of the project and therefore makes project success at least from suppli...

  10. How to Begin a Quality Improvement Project.

    Science.gov (United States)

    Silver, Samuel A; Harel, Ziv; McQuillan, Rory; Weizman, Adam V; Thomas, Alison; Chertow, Glenn M; Nesrallah, Gihad; Bell, Chaim M; Chan, Christopher T

    2016-05-06

    Quality improvement involves a combined effort among health care staff and stakeholders to diagnose and treat problems in the health care system. However, health care professionals often lack training in quality improvement methods, which makes it challenging to participate in improvement efforts. This article familiarizes health care professionals with how to begin a quality improvement project. The initial steps involve forming an improvement team that possesses expertise in the quality of care problem, leadership, and change management. Stakeholder mapping and analysis are useful tools at this stage, and these are reviewed to help identify individuals who might have a vested interest in the project. Physician engagement is a particularly important component of project success, and the knowledge that patients/caregivers can offer as members of a quality improvement team should not be overlooked. After a team is formed, an improvement framework helps to organize the scientific process of system change. Common quality improvement frameworks include Six Sigma, Lean, and the Model for Improvement. These models are contrasted, with a focus on the Model for Improvement, because it is widely used and applicable to a variety of quality of care problems without advanced training. It involves three steps: setting aims to focus improvement, choosing a balanced set of measures to determine if improvement occurs, and testing new ideas to change the current process. These new ideas are evaluated using Plan-Do-Study-Act cycles, where knowledge is gained by testing changes and reflecting on their effect. To show the real world utility of the quality improvement methods discussed, they are applied to a hypothetical quality improvement initiative that aims to promote home dialysis (home hemodialysis and peritoneal dialysis). This provides an example that kidney health care professionals can use to begin their own quality improvement projects. Copyright © 2016 by the American

  11. The COMPOSE Project

    Science.gov (United States)

    Balletta, P.; Biagini, M.; Gallinaro, G.; Vernucci, A.

    2003-07-01

    This paper provides an overview of the on-going project COMPOSE, an EC co-funded project aiming to define, specify and validate an innovative mobile-services scenario in support of travellers, and to demonstrate the effectiveness of the new proposed location-based value-added services. COMPOSE is supported by organisations belonging to numerous categories covering, as a whole, the entire value-chain of infomobility services provision to the final user. The project team comprises, in addition to the affiliations of the authors, also Teleatlas (NL), ARS T&TT (NL), Alcatel-Bell Space (B), Skysoft (P), Hitech Marketing (A) and MobileGis (IR). The paper describes the services that will be offered to users, encompassing both the pre-trip and the on-trip framework, presents the overall hybrid system architecture also including a via-satellite component based upon the Wideband-CDMA (W-CDMA) technique adopted in UMTS, discusses the access solutions envisaged for that component permitting multiple feeder-link stations to share the CDMA multiplex capacity by directly transmitting their codes to the satellite, and illustrates the results of some computer simulations intended to assess the performance of said access solutions, with regard to the effects of the inevitable up- link frequency errors and transponder non-linearity.

  12. Team-client Relationships And Extreme Programming

    Directory of Open Access Journals (Sweden)

    John Karn

    2008-01-01

    Full Text Available This paper describes a study that examined the relationship between software engineering teams who adhered to the extreme programming (XP methodology and their project clients. The study involved observing teams working on projects for clients who had commissioned a piece of software to be used in the real world. Interviews were conducted during and at the end of the project to get client opinion on how the project had progressed. Of interest to the researchers were opinions on frequency of feedback, how the team captured requirements, whether or not the iterative approach of XP proved to be helpful, and the level of contextual and software engineering knowledge the client had at the start of the project. In theory, fidelity to XP should result in enhanced communication, reduce expectation gaps, and lead to greater client satisfaction. Our results suggest that this depends heavily on the communication skills of the team and of the client, the expectations of the client, and the nature of the project.

  13. Project management: a case of fixed price IS/IT projects. Analysis of projects by project scopes

    Directory of Open Access Journals (Sweden)

    Miroslav Kral

    2012-10-01

    Full Text Available The paper provides an overview of major issues of IS / IT projects. Attention will be focused on projects that are implemented under a contract for a specified amount of work and fixed price. The main purpose of the paper is to analyse the project parameters in terms of the types of projects, and to confirm, or refuse, a hypothesis related to this. There is some evidence from the portfolio of projects that have been implemented by the international companies providing IT services. Regarding the localisation, CEE region was selected for our research. The outputs of the paper should be a contribution to managing IS/IT projects in IT service delivery organizations and for the support of innovative thinking about project management generally.

  14. Groups Meet . . . Teams Improve: Building Teams That Learn

    Science.gov (United States)

    Hillier, Janet; Dunn-Jensen, Linda M.

    2013-01-01

    Although most business students participate in team-based projects during undergraduate or graduate course work, the team experience does not always teach team skills or capture the team members' potential: Students complete the task at hand but the explicit process of becoming a team is often not learned. Drawing from organizational learning…

  15. Project management approach for the Waste Area Grouping 6 Closure/Remediation Project at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1992-07-01

    This document has been developed as a preliminary definition of the Waste Area Grouping (WAG) 6 Closure Project Management Approach. The purpose of this document is to identify the roles and responsibilities of the various project team members and to identify the project scope, schedule and budget. This document is intended to be a living document. As information develops, this document will be revised to create a WAG 6 Project Management Plan (PMP). The PMP will provide additional focus to the information contained in this document. The information required will be available as the selected alternative for remediation of WAG 6 is approved and Remedial Action Plans are conceptualized. This document has been reviewed against, and is intended to be consistent with, the Environmental Restoration Program Management Plan

  16. Characterization of unpaved road condition through the use of remote sensing project - phase II, deliverable 8-D: final report.

    Science.gov (United States)

    2016-03-07

    Building on the success of developing a UAV based unpaved road assessment system in Phase I, the project team was awarded a Phase II project by the USDOT to focus on outreach and implementation. The project team added Valerie Lefler of Integrated Glo...

  17. The German joint research project "concepts for future gravity satellite missions"

    Science.gov (United States)

    Reubelt, Tilo; Sneeuw, Nico; Fichter, Walter; Müller, Jürgen

    2010-05-01

    Within the German joint research project "concepts for future gravity satellite missions", funded by the Geotechnologies programme of the German Federal Ministry of Education and Research, options and concepts for future satellite missions for precise (time-variable) gravity field recovery are investigated. The project team is composed of members from science and industry, bringing together experts in geodesy, satellite systems, metrology, sensor technology and control systems. The majority of team members already contributed to former gravity missions. The composition of the team guarantees that not only geodetic aspects and objectives are investigated, but also technological and financial constraints are considered. Conversely, satellite, sensor and system concepts are developed and improved in a direct exchange with geodetic and scientific claims. The project aims to develop concepts for both near and mid-term future satellite missions, taking into account e.g. advanced satellite formations and constellations, improved orbit design, innovative metrology and sensor systems and advances in satellite systems.

  18. The Secure Information Exchange (SIX) Project at the OPCW

    International Nuclear Information System (INIS)

    Gulay, M.; Milenkovic, G.

    2015-01-01

    The Chemical Weapons Convention (CWC) entered into force in 1997 and the member states of the Organisation for the Prohibition of Chemical Weapons (OPCW) have obligations for making declarations under various articles of the convention. These declarations could contain confidential information and until recently the only mechanism to submit confidential information to the OPCW Technical Secretariat was through physical delivery by the permanent representatives of the member states which introduced delays in the exchange of information in general. In 2012, the Technical Secretariat initiated a strategic project to establish a secure electronic transmission channel that could be used as an alternative option for the exchange of information between the Technical Secretariat and the member states. The Secure Information Exchange (SIX) Project has been given priority by the Director-General and it received support from the member states. A core project team comprising representatives of the main business unit, the office of legal affairs, IT security and implementation teams were established. Following a feasibility study and with continuous communication with the representatives of the member states, the pilot phase of the project was completed successfully in 2013. In the near future, the project will go live and the member states and the Technical Secretariat will benefit from this key initiative. This paper aims to provide an overview of the project: the solution approach, data gathered in order to assess the delays in communication through traditional means, IT security and implementation issues as well as the legal considerations. (author)

  19. Experiential, Collaborative and Team Projects: Communication Audits in the MBA Communication Course

    Science.gov (United States)

    Hart, Claudia; Vroman, Margo; Stulz, Karin

    2015-01-01

    In this paper the authors discuss the challenges and rewards of building a graduate level Managerial Communication course around an experiential communication audit project. The purpose of the project was to provide MBA (Master of Business Administration) students with exposure to the real world responsibilities and demands of working in a complex…

  20. Team-Teaching a Digital Senior Capstone Project in CTE

    Science.gov (United States)

    Ryan, Melanie D.; Tews, Nichole M.; Washer, Barton A.

    2012-01-01

    Secondary career and technical education (CTE) students are faced with the unique challenge of learning not only specific content-related knowledge and skills, but also postsecondary preparation, 21st century technology, employability and self-marketing skills. At Cass Career Center in Harrisonville, Missouri, a senior capstone project was…

  1. The ITER divertor cassette project

    International Nuclear Information System (INIS)

    Ulrickson, M.; Tivey, R.; Akiba, M.

    2001-01-01

    The divertor ''Large Project'' was conceived with the aim of demonstrating the feasibility of meeting the lifetime requirements by employing the candidate armor materials of beryllium, tungsten (W) and carbon-fiber-composite (CFC). At the start, there existed only limited experience with constructing water-cooled high heat flux armored components for tokamaks. To this was added the complication posed by the need to use a silver-free joining technique that avoids the transmutation of n-irradiated silver to cadmium. The research project involving the four Home Teams (HTs) has focused on the design, development, manufacture and testing of full-scale Plasma Facing Components (PFCs) suitable for ITER. The task addressed all the issues facing ITER divertor design, such as providing adequate armor erosion lifetime, meeting the required armor-heat sink joint lifetime and heat sink fatigue life, sustaining thermal-hydraulic and electromechanical loads, and seeking to identify the most cost-effective manufacturing options. This paper will report the results of the divertor large project. (author)

  2. The ITER divertor cassette project

    International Nuclear Information System (INIS)

    Ulrickson, M.; Tivey, R.; Akiba, M.

    1999-01-01

    The divertor 'Large Project' was conceived with the aim of demonstrating the feasibility of meeting the lifetime requirements by employing the candidate armor materials of beryllium, tungsten (W) and carbon-fiber-composite (CFC). At the start, there existed only limited experience with constructing water-cooled high heat flux armored components for tokamaks. To this was added the complication posed by the need to use a silver-free joining technique that avoids the transmutation of n-irradiated silver to cadmium. The research project involving the four Home Teams (HTs) has focused on the design, development, manufacture and testing of full-scale Plasma Facing Components (PFCs) suitable for ITER. The task addressed all the issues facing ITER divertor design, such as providing adequate armor erosion lifetime, meeting the required armor-heat sink joint lifetime and heat sink fatigue life, sustaining thermal-hydraulic and electromechanical loads, and seeking to identify the most cost-effective manufacturing options. This paper will report the results of the divertor large project. (author)

  3. The SKI SITE-94 Project: An International Peer Review Carried out by an OECD/NEA Team of Experts

    International Nuclear Information System (INIS)

    Sagar, Budhi; Devillers, C.; Smith, Paul; Laliuex, P.; Pescatore, C.

    1997-10-01

    The recently completed SITE-94 project is an SKI effort directed at building competence and capacity in the assessment of safety of a spent-fuel geologic repository. Emphasis is given to the assimilation of site-specific data, with its associated uncertainties, into the performance assessment. Specific attention is also given to improving the understanding of mechanisms that might compromise canister integrity. This report represents the common views of an International Review Team (IRT) established by the NEA Secretariat, at the request of SKI, to perform a peer review of SITE-94. The basis for the report is the understanding of SITE-94 and its background obtained by IRT in the course of several months of study of SITE-94 documentation, internal discussions and a meeting with SKI in Stockholm. The report is limited to the main findings of IRT. The intended audience of the report is the staff of SKI and, accordingly, the style of the report is suited to a technical audience familiar with the contents of the SITE-94 project

  4. Integrating public information activities on a technical project

    International Nuclear Information System (INIS)

    Little, Sh. K.; Vecchiola, S.F.

    1984-01-01

    Through gradual evolution and successful performance, the WIPP Communications group has gained respect and recognition as a dual service organization that offers numerous benefits to a technical project. Westinghouse assembled a team that has successfully coordinated and encouraged an exchange of information not only with the public information realm but also as a project service and function. WIPP has combined educational services, external and employee communication and public information into one unit called ''Communications''

  5. Work Project Report

    CERN Document Server

    Sallinen, Roosa-Maria

    2015-01-01

    I worked in High Power Converters section (HPC). My supervisors were Karsten Kahle and Charles-Mathieu Genton. Our team consisted of us and Francisco Rafael Blanquez Delgado who also helped me if I had any problems. The team’s main assignment is to design the new Static Var Compensator (SVC) for MEQ59 in Meyrin. The idea is to standardise all the SVCs needed at CERN in order to make the design, installation and maintenance easier and more cost effective. This report describes my project at CERN.

  6. CooMan - a global collaborative project management system

    International Nuclear Information System (INIS)

    Souza, J.M. de; Palma, S.

    1994-01-01

    Project Coordination and Management have long been recognized as an area with growing problems and unsatisfactory solutions. Conciliating flexibility with target achievements is historically the main problem to face. The difficulties have been growing at more than linear ratio with the size and complexity of the Projects being developed in the present days. The HEP communities suffer additional challenges because of the distributed nature of the collaborations, the novelty of each project; and the less authoritarian form of leadership and management of team and individual. This prevents the adoption of more centralized focus on decision. CooMan intends to be a Global Collaborative Project Management System. This paper discusses the basic aspects of the concepts involved, outlining how task coordination, acts of speech, and World-Wide hyper media can be used to support project management activities. A distributed tool to implement such proposition is described, and a first prototype is presented

  7. Collins pine/BCI biomass to ethanol project

    International Nuclear Information System (INIS)

    Yancy, M.A.; Hinman, N.D.; Sheehan, J.J.; Tiangco, V.M.

    1999-01-01

    California has abundant biomass resources and a growing transportation fuels market. These two facts have helped to create an opportunity for biomass to ethanol projects within the state. One such project under development is the Collins Pine/BCI Project. Collins Pine Company and BC International (BCI) have teamed up to develop a forest biomass to ethanol facility to be collocated with Collins Pine's 12 MW, biomass-fueled electric generator in Chester, California. The Collins Pine Company (headquartered in Portland, Oregon) is an environmentally progressive lumber company that has owned and operated timberlands near Chester, California since the turn of the century. Collins manages 100,000 acres of timberland in the immediate area of the project. BCI (Dedham, Massachusetts) holds an exclusive license to a new, patented biotechnological process to convert lignocellulosic materials into ethanol and other specially chemicals with significant cost savings and environmental benefits. The project has received a California Energy Commission PIER program award to continue the developmental work done in the Quincy Library Group's Northeastern California Ethanol Manufacturing Feasibility Study (November 1997). This paper provides (1) a brief overview of the biomass and transportation fuels market in California; (2) the current status of the Collins Pine/BCI biomass ethanol project; and (3) future prospects and hurdles for the project to overcome. (author)

  8. Managing project complexity : A study into adapting early project phases to improve project performance in large engineering projects

    NARCIS (Netherlands)

    Bosch-Rekveldt, M.G.C.

    2011-01-01

    Engineering projects become increasingly more complex and project complexity is assumed to be one of the causes for projects being delivered late and over budget. However, what this project complexity actually comprised of was unclear. To improve the overall project performance, this study focuses

  9. IS-ENES project management - lessons learnt

    Science.gov (United States)

    Parinet, Marie; Guglielmo, Francesca; Joussaume, Sylvie

    2017-04-01

    IS-ENES is the distributed e-infrastructure of models, model data and metadata of the European Network for Earth System Modelling (ENES). It has benefitted from two EC FP7 grants and aims towards further European and national funding to achieve sustainability. We highlight here several challenges related to project management that have risen in the course of these two project-phases spanning 8 years. Some challenges are related to the heterogeneity of the activities within IS-ENES, with different groups working on very diverse activities, not necessarily strictly interdependent. An immediate consequence is the need of implementing and setting up in early phases of the project efficient collection and circulation of information to preserve and reinforce the systemic view of the infrastructure as a whole and the pursuit of common goals, including coordinated provision of services. Toward and beyond such common goals, managing IS-ENES, covering both scientific and more strictly management-related aspects, implies a double-paced approach: besides setting up efficient project workflow, there is the need of setting up longer term objectives. This implies, within the project lifetime, to elaborate and implement a coherent organizational (consistent with scientific goals, funding schemes, research and technology landscape) strategy to pursue these goals beyond the project itself. Furthermore, a series of more generic project management challenges will also be listed and can be gathered around 3 main objectives: ease the internal processes in order to optimize the work, anticipate delays and budget issues, and motivate the project teams by ensuring an efficient internal and external communication.

  10. Diversity in research projects - A key to success?

    Science.gov (United States)

    Henkel, Daniela; Eisenhauer, Anton; Taubner, Isabelle

    2017-04-01

    According to demographers, psychologists, sociologists and economists diverse groups, which are groups of different race, ethnicity, gender and sexual orientation, are more innovative than homogeneous groups. This is also true for groups working together in research collaborations and international cooperation involving a culturally and functionally diverse mix of individuals who have to be integrated into an effective unit - a project team. If the goal is scientific excellence, diversity should be an essential ingredient to conduct science on high level productivity, quality and innovation. Effective teamwork is a key to project success and prime responsibilities of the project manager. Therefore, the project manager has to take into consideration different characteristics such as cultures, languages, and different values related to individual project partners. Here we show how diversity can affect the performance of a research project. Furthermore, the presentation indicates skills and abilities which are required for the management in order to deal also with the challenges of diversity in research projects. The presentation is based on insights experienced in the context of an Innovative Training Network (ITN) project within Marie Skłodowska-Curie Actions of the European HORIZON 2020 program and TRION a Collaborative Research Project in the Framework of the Trilateral Program of the German Research Foundation.

  11. Rural interdisciplinary mental health team building via satellite: a demonstration project.

    Science.gov (United States)

    Cornish, Peter A; Church, Elizabeth; Callanan, Terrence; Bethune, Cheri; Robbins, Carl; Miller, Robert

    2003-01-01

    This paper reports on the results of a demonstration project that examined the role of telehealth/telemedicine (hereafter referred to as telehealth) in providing interdisciplinary mental health training and support to health professionals in a rural region of Atlantic Canada. Special emphasis was placed on addressing the question of how training might affect interdisciplinary collaboration among the rural health professionals. Five urban mental health professionals from three disciplines provided training and support via video-satellite and internet, print and video resources to 34 rural health and community professionals. In order to assess the rural community's needs and the impact of the interventions, questionnaires were administered and on-site interviews were conducted before and after the project. Throughout the project, field notes were recorded and satisfaction ratings were obtained. Satisfaction with the video-satellite presentations was high and stable, with the exception of one session when signal quality was very poor. Rural participants were most satisfied with opportunities for interaction and least satisfied with the variable quality of the video transmission signal. High staff turnover among rural professionals resulted in insufficient power to permit statistical analysis. Positive reports of the project impact included expanded knowledge and heightened sensitivity to mental health issues, increased cross-disciplinary connections, and greater cohesion among professionals. The results suggest that, with some refinements, telehealth technology can be used to facilitate mental health training and promote interdisciplinary collaboration among professionals in a rural setting.

  12. Eleven Tribes Jump START Clean Energy Projects, Summer 2012 (Newsletter)

    Energy Technology Data Exchange (ETDEWEB)

    2012-06-01

    This newsletter describes key activities of the DOE Office of Indian Energy Policy and Programs for Summer 2012. The U.S. Department of Energy Office of Indian Energy Policy and Programs (DOE-IE) has selected 11 Tribes - five in Alaska and six in the contiguous United States - to receive on-the-ground technical support for community-based energy efficiency and renewable energy projects as part of DOE-IE's Strategic Technical Assistance Response Team (START) Program. START finalists were selected based on the clarity of their requests for technical assistance and the ability of START to successfully work with their projects or community. Technical experts from DOE and its National Renewable Energy Laboratory (NREL) will work directly with community-based project teams to analyze local energy issues and assist the Tribes in moving their projects forward. In Alaska, the effort will be bolstered by DOE-IE's partnership with the Denali Commission, which will provide additional assistance and expertise, as well as funding to fuel the Alaska START initiative.

  13. Meeting of the ITER CTA Project Board

    International Nuclear Information System (INIS)

    Vlasenkov, V.

    2002-01-01

    The meeting of the ITER CTA Project Board (PB) took place in Toronto, Canada on 16 September 2002 on the occasion of the fifth Negotiations Meeting (N-5). Thirteen participants, PB members and experts from Canada, EU, Japan, RF and the International Team (IT) attended the meeting chaired by Acad. E. Velikhov. PB heard progress reports of the participating parties and the comments concerning the status of participants team (PT) and the IT were presented

  14. Teaching Engineering Students Team Work

    Science.gov (United States)

    Levi, Daniel

    1998-01-01

    The purpose of this manual is to provide professor's in engineering classes which the background necessary to use student team projects effectively. This manual describes some of the characteristics of student teams and how to use them in class. It provides a set of class activities and films which can be used to introduce and support student teams. Finally, a set of teaching modules used in freshmen, sophomore, and senior aeronautical engineering classes are presented. This manual was developed as part of a NASA sponsored project to improve the undergraduate education of aeronautical engineers. The project has helped to purchase a set of team work films which can be checked out from Cal Poly's Learning Resources Center in the Kennedy Library. Research for this project has included literature reviews on team work and cooperative learning; interviews, observations, and surveys of Cal Poly students from Industrial and Manufacturing Engineering, Aeronautical Engineering and Psychology; participation in the Aeronautical Engineering senior design lab; and interviews with engineering faculty. In addition to this faculty manual, there is a student team work manual which has been designed to help engineering students work better in teams.

  15. Spent Nuclear Fuel project, project management plan

    International Nuclear Information System (INIS)

    Fuquay, B.J.

    1995-01-01

    The Hanford Spent Nuclear Fuel Project has been established to safely store spent nuclear fuel at the Hanford Site. This Project Management Plan sets forth the management basis for the Spent Nuclear Fuel Project. The plan applies to all fabrication and construction projects, operation of the Spent Nuclear Fuel Project facilities, and necessary engineering and management functions within the scope of the project

  16. Introducing AstroGen: the Astronomy Genealogy Project

    Science.gov (United States)

    Tenn, Joseph S.

    2016-12-01

    The Astronomy Genealogy Project (AstroGen), a project of the Historical Astronomy Division of the American Astronomical Society (AAS), will soon appear on the AAS website. Ultimately, it will list the world's astronomers with their highest degrees, theses for those who wrote them, academic advisors (supervisors), universities, and links to the astronomers or their obituaries, their theses when online, and more. At present the AstroGen team is working on those who earned doctorates with astronomy-related theses. We show what can be learned already, with just ten countries essentially completed.

  17. Meeting of the ITER CTA Project Board

    International Nuclear Information System (INIS)

    Vlasenkov, V.

    2001-01-01

    The meeting of the ITER CTA Project Board took place in Toronto, Canada on 7 November 2001, on the occasion of the first Negotiations Meeting. Twelve participants, representing PB members and experts from Canada, the EU, Japan, the RF and the international Team (IT), attended the meeting chaired by Acad. E. Velikhov. Discussions on the preliminary work programme for the CTA and organizational arrangements for the IT and PT took most of the time of the meeting. The Project Board approved the preliminary work programme as presented by the IT leader

  18. Measuring Team Learning Behaviours through Observing Verbal Team Interaction

    Science.gov (United States)

    Raes, Elisabeth; Boon, Anne; Kyndt, Eva; Dochy, Filip

    2015-01-01

    Purpose: This study aims to explore, as an answer to the observed lack of knowledge about actual team learning behaviours, the characteristics of the actual observed basic team learning behaviours and facilitating team learning behaviours more in-depth of three project teams. Over time, team learning in an organisational context has been…

  19. Making project documentation a positive tool for management

    International Nuclear Information System (INIS)

    Shirley, C.G.

    1985-01-01

    Since 1980, Sandia National Laboratory has been designing and constructing Particle Beam Fusion Accelerator II. One managerial challenge of a large project is the problem of handling information. The scope of the PBFA-II projet may be gauged by its cost: $19.4 million for the accelerator itself, $9.5 million for buildings and standard utilities, and $9.6 million for specialized utilities and support systems. The first need of the project at its outset, then, was communication, and this remains a chief function of the CPO. If the nature or magnitude of the risk changes in any one area, the entire project team must know. If a design is changed, persons working on interdependent efforts must know. Some of this communication takes place naturally and informally. But project procedures must guarantee that all important communication is received by all necessary people, that the communication creates accountability, and that management receives timely, accurate reports. To put it another way, important communication requires project documentation. Documentation is both a record of the project and a tool for management

  20. Hanford's 100-HX Pump and Treat Project - a Successful Blend of Science, Technology, Construction, and Project Management - 12412

    Energy Technology Data Exchange (ETDEWEB)

    Albin, Kenneth A.; Bachand, Marie T.; Biebesheimer, Fred H.; Neshem, Dean O.; Smoot, John L. [CH2M HILL Plateau Remediation Company, Richland, Washington 99352 (United States)

    2012-07-01

    CH2M Hill Plateau Remediation Company (CHPRC) recently completed construction and start-up of the $25 million 100-HX Groundwater Pump and Treat Project for the Department of Energy (DOE) at its Hanford Reservation site in Washington State. From the onset, the 100-HX Project Leadership Team was able to successfully blend the science and technology of a state-of-the-art groundwater pump and treat system with the principles, tools, and techniques of traditional industrial-type construction and project management. From the 1940's through most of the 1980's, the United States used the Hanford Site to produce nuclear material for national defense at reactor sites located along the Columbia River. While the reactors were operational, large volumes of river water were treated with sodium dichromate (to inhibit corrosion of the reactor piping) and used as a coolant for the reactors. After a single pass through the reactor and before being discharged back to the river, the coolant water was sent to unlined retention basins to cool and to allow the short-lived radioactive contaminants to decay. As a result of these operations, hexavalent chromium was introduced to the vadose zone, and ultimately into the groundwater aquifer and the adjacent Columbia River. In addition, numerous leaks and spills of concentrated sodium dichromate stock solution over the lifetime of reactor operations led to higher concentrations of chromate in the vadose zone and groundwater in localized areas. As a result, the 100 Area was included in the National Priorities List sites under the Comprehensive Environmental Response Compensation and Liability Act of 1980 (CERCLA). The mission of the 100-HX Project is to significantly reduce the concentration of hexavalent chromium in the groundwater by treating up to 3.8 billion gallons (14,300 mega-liters) of contaminated water over its first nine years of operations. In order to accomplish this mission, groundwater scientists and geologists using

  1. Team role stress : relationships with team learning and performance in project teams

    NARCIS (Netherlands)

    Savelsbergh, C.; Gevers, J.M.P.; Heijden, van der B.I.J.M.; Poell, R.F.

    2012-01-01

    Although role stress literature has almost exclusively focused on individual role incumbents, it is conceivable that shared conditions of ambiguity, conflict, and quantitative or qualitative overload may give rise to a collective experience of role stress in teams. Testing a multilevel mediation

  2. Secure Interoperable Open Smart Grid Demonstration Project

    Energy Technology Data Exchange (ETDEWEB)

    Magee, Thoman [Consolidated Edison Company Of New York, Inc., NY (United States)

    2014-12-28

    . The SGDP enables the efficient, flexible integration of these disparate resources and lays the architectural foundations for future scalability. Con Edison assembled an SGDP team of more than 16 different project partners, including technology vendors, and participating organizations, and the Con Edison team provided overall guidance and project management. Project team members are listed in Table 1-1.

  3. Architectures of adaptive integration in large collaborative projects

    Directory of Open Access Journals (Sweden)

    Lois Wright Morton

    2015-12-01

    Full Text Available Collaborations to address complex societal problems associated with managing human-natural systems often require large teams comprised of scientists from multiple disciplines. For many such problems, large-scale, transdisciplinary projects whose members include scientists, stakeholders, and other professionals are necessary. The success of very large, transdisciplinary projects can be facilitated by attending to the diversity of types of collaboration that inevitably occur within them. As projects progress and evolve, the resulting dynamic collaborative heterogeneity within them constitutes architectures of adaptive integration (AAI. Management that acknowledges this dynamic and fosters and promotes awareness of it within a project can better facilitate the creativity and innovation required to address problems from a systems perspective. In successful large projects, AAI (1 functionally meets objectives and goals, (2 uses disciplinary expertise and concurrently bridges many disciplines, (3 has mechanisms to enable connection, (4 delineates boundaries to keep focus but retain flexibility, (5 continuously monitors and adapts, and (6 encourages project-wide awareness. These principles are illustrated using as case studies three large climate change and agriculture projects funded by the U.S. Department of Agriculture-National Institute of Food and Agriculture.

  4. ERATOSTHENES: excellence research Centre for Earth surveillance and space-based monitoring of the environment, the EXCELSIOR Horizon 2020 teaming project

    Science.gov (United States)

    Hadjimitsis, Diofantos G.; Kontoes, Haris; Schreier, Gunter; Ansmann, Albert; Komodromos, George; Themistocleous, Kyriacos; Mamouri, Rodanthi; Michaelides, Silas; Nisantzi, Argyro; Papoutsa, Christiana; Neocleous, Kyriacos; Mettas, Christodoulos; Tzouvaras, Marios; Evagorou, Evagoras; Christofe, Andreas; Melillos, George; Papoutsis, Ioannis

    2017-10-01

    The aim of this paper is to present the strategy and vision to upgrade the existing ERATOSTHENES Research Centre (ERC) established within the Cyprus University of Technology (CUT) into a sustainable, viable and autonomous Centre of Excellence (CoE) for Earth Surveillance and Space-Based Monitoring of the Environment, which will provide the highest quality of related services on the National, European and International levels. EXCELSIOR is a Horizon 2020 Teaming project which addresses a specific challenge defined by the work program, namely, the reduction of substantial disparities in the European Union by supporting research and innovation activities and systems in low performing countries. It also aims at establishing long-term and strategic partnerships between the Teaming partners, thus reducing internal research and innovation disparities within European Research and Innovation landscape. The proposed CoE envisions the upgrading of the existing ERC into an inspiring environment for conducting basic and applied research and innovation in the areas of the integrated use of remote sensing and space-based techniques for monitoring the environment. Environment has been recognized by the Smart Specialization Strategy of Cyprus as the first horizontal priority for future growth of the island. The foreseen upgrade will regard the expansion of this vision to systematic monitoring of the environment using Earth Observation, space and ground based integrated technologies. Such an approach will lead to the systematic monitoring of all three domains of the Environment (Air, Land, Water). Five partners have united to upgrade the existing ERC into a CoE, with the common vision to become a world-class innovation, research and education centre, actively contributing to the European Research Area (ERA). More specifically, the Teaming project is a team effort between the Cyprus University of Technology (CUT, acting as the coordinator), the German Aerospace Centre (DLR), the

  5. American Fuel Cell Bus Project Evaluation. Second Report

    Energy Technology Data Exchange (ETDEWEB)

    Eudy, Leslie [National Renewable Energy Lab. (NREL), Golden, CO (United States); Post, Matthew [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2015-09-01

    This report presents results of the American Fuel Cell Bus (AFCB) Project, a demonstration of fuel cell electric buses operating in the Coachella Valley area of California. The prototype AFCB was developed as part of the Federal Transit Administration's (FTA's) National Fuel Cell Bus Program. Through the non-profit consortia CALSTART, a team led by SunLine Transit Agency and BAE Systems developed a new fuel cell electric bus for demonstration. SunLine added two more AFCBs to its fleet in 2014 and another in 2015. FTA and the AFCB project team are collaborating with the U.S. Department of Energy (DOE) and DOE's National Renewable Energy Laboratory to evaluate the buses in revenue service. This report summarizes the performance results for the buses through June 2015.

  6. Project management of life-science research projects: project characteristics, challenges and training needs.

    Science.gov (United States)

    Beukers, Margot W

    2011-02-01

    Thirty-four project managers of life-science research projects were interviewed to investigate the characteristics of their projects, the challenges they faced and their training requirements. A set of ten discriminating parameters were identified based on four project categories: contract research, development, discovery and call-based projects--projects set up to address research questions defined in a call for proposals. The major challenges these project managers are faced with relate to project members, leadership without authority and a lack of commitment from the respective organization. Two-thirds of the project managers indicated that they would be interested in receiving additional training, mostly on people-oriented, soft skills. The training programs that are currently on offer, however, do not meet their needs. Copyright © 2010 Elsevier Ltd. All rights reserved.

  7. Calderon cokemaking process/demonstration project

    International Nuclear Information System (INIS)

    Albert Calderon

    1998-01-01

    This project deals with the demonstration of a coking process using proprietary technology of Calderon, with the following objectives geared to facilitate commercialization: (i) making coke of such quality as to be suitable for use in hard-driving, large blast furnaces; (ii) providing proof that such process is continuous and environmentally closed to prevent emissions; (iii) demonstrating that high-coking-pressure (non-traditional) coal blends which cannot be safely charged into conventional by-product coke ovens can be used in the Calderon process; and (iv) demonstrating that coke can be produced economically, at a level competitive with coke imports. The activities of the past quarter were focused on the following: Consolidation of the project team-players; Recruiting Koppers Industries as an additional stakeholder; Developing a closed system for the production of binder pitch from tar in the Calderon coking process as the incentive for Koppers to join the team; Gathering appropriate equipment for conducting a set of experiments at bench scale to simulate tar quality produced from the Calderon coking process for the production of binder pitch; and Further progress made in the design of the commercial coking reactor

  8. Using Contests to Provide Business Students Project-Based Learning in Humanitarian Logistics: PSAid Example

    Science.gov (United States)

    Özpolat, Koray; Chen, Yuwen; Hales, Doug; Yu, Degan; Yalcin, Mehmet G.

    2014-01-01

    Business students appreciate working on classroom projects that are both enjoyable and useful in preparing them for future careers. Promoting competition among project teams is also used as a method to motivate students. The Humanitarian Logistics Project (HLP) teaches undergraduate students the logistical implications of unsolicited material…

  9. U.S. China Carbon Capture and Storage Development Project at West Virginia University

    Energy Technology Data Exchange (ETDEWEB)

    Fletcher, Jerald

    2013-12-31

    The original overall objective of this activity was to undertake resource evaluation and planning for CCS projects and to describe and quantify the geologic, environmental, and economic challenges to successful development of large-scale CCS in China’s coal sector. Several project execution barriers were encountered in the course of this project, most notably a project stop/delay due to funds availability/costing restrictions from the US State Department to the US Department of Energy at the end of CY2012, which halted project execution from January 2, 2013 to April 1, 2013. At the resolution of this project delay, it was communicated to the project team that the overall project period would also be reduced, from a completion date of February 28, 2014 to December 31, 2013. The net impact of all these changes was a reduction in the project period from 24 months (3/1/2012-2/28/2014) to 22 months (3/1/2012-12/31/2013), with a 3 month stop from 1/1/2013-3/31/2013. The project team endeavored to overcome these project time impacts, focusing heavily on technoeconomic modeling that would be deliverable under Task 3 (Ordos Basin Feasibility Study), and choosing to abandon the full investigation into the Demonstration Site (Task 4) due to the reduced project time. The ultimate focus of this project changed to work with the Chinese on a carbon atlas/geologic characterization, and on mechanisms for CO2 storage options from high-quality streams within China.

  10. ARPA-E Impacts: A Sampling of Project Outcomes, Volume II

    Energy Technology Data Exchange (ETDEWEB)

    Rohlfing, Eric [Dept. of Energy (DOE), Washington DC (United States). Advanced Research Projects Agency-Energy (ARPA-E)

    2017-02-27

    The Advanced Research Projects Agency-Energy (ARPA-E) is demonstrating that a collaborative model has the power to deliver real value. The Agency’s first compilation booklet of impact sheets, published in 2016, began to tell the story of how ARPA-E has already made an impact in just seven years—funding a diverse and sophisticated research portfolio on advanced energy technologies that enable the United States to tackle our most pressing energy challenges. One year later our research investments continue to pay off, with a number of current and alumni project teams successfully commercializing their technologies and advancing the state of the art in transformative areas of energy science and engineering. There is no single measure that can fully illustrate ARPA-E’s success to date, but several statistics viewed collectively begin to reveal the Agency’s impact. Since 2009, ARPA-E has provided more than $1.5 billion in funding for 36 focused programs and three open funding solicitations, totaling over 580 projects. Of those, 263 are now alumni projects. Many teams have successfully leveraged ARPA-E’s investment: 56 have formed new companies, 68 have partnered with other government agencies to continue their technology development, and 74 teams have together raised more than $1.8 billion in reported funding from the private sector to bring their technologies to market. However, even when viewed together, those measures do not capture ARPA-E’s full impact. To best understand the Agency’s success, the specific scientific and engineering challenges that ARPA-E project teams have overcome must be understood. This booklet provides concrete examples of those successes, ranging from innovations that will bear fruit in the future to ones that are beginning to penetrate the market as products today. Importantly, half of the projects highlighted in this volume stem from OPEN solicitations, which the agency has run in 2009, 2012, and 2015. ARPA-E’s OPEN programs

  11. Sun light European Project

    Science.gov (United States)

    Soubielle, Marie-Laure

    2015-04-01

    2015 has been declared the year of light. Sunlight plays a major role in the world. From the sunbeams that heat our planet and feed our plants to the optical analysis of the sun or the modern use of sun particles in technologies, sunlight is everywhere and it is vital. This project aims to understand better the light of the Sun in a variety of fields. The experiments are carried out by students aged 15 to 20 in order to share their discoveries with Italian students from primary and secondary schools. The experiments will also be presented to a group of Danish students visiting our school in January. All experiments are carried out in English and involve teams of teachers. This project is 3 folds: part 1: Biological project = what are the mechanisms of photosynthesis? part 2: Optical project= what are the components of sunlight and how to use it? part 3: Technical project= how to use the energy of sunlight for modern devices? Photosynthesis project Biology and English Context:Photosynthesis is a process used by plants and other organisms to convert light energy, normally from the Sun, into chemical energy that can later fuel the organisms' activities. This chemical energy is stored in molecules which are synthesized from carbon dioxide and water. In most cases, oxygen is released as a waste product. Most plants perform photosynthesis. Photosynthesis maintains atmospheric oxygen levels and supplies all of the organic compounds and most of the energy necessary for life on Earth. Outcome: Our project consists in understanding the various steps of photosynthesis. Students will shoot a DVD of the experiments presenting the equipments required, the steps of the experiments and the results they have obtained for a better understanding of photosynthesis Digital pen project Electricity, Optics and English Context: Sunlight is a complex source of light based on white light that can be decomposed to explain light radiations or colours. This light is a precious source to create

  12. System engineering at the MEGARA project

    Science.gov (United States)

    Pérez-Calpena, A.; García-Vargas, María. Luisa; Gil de Paz, A.; Gallego Maestro, J.; Carrasco Licea, E.; Sánchez Moreno, F.; Iglesias-Páramo, J.

    2014-08-01

    MEGARA (Multi-Espectrógrafo en GTC de Alta Resolución para Astronomía) is a facility instrument of the 10.4m GTC (La Palma, Spain) working at optical wavelengths that provides both Integral-Field Unit (IFU) and Multi- Object Spectrograph (MOS) capabilities at resolutions in the range R=6,000-20,000. The MEGARA focal plane subsystems are located at one of the GTC focal stations, while the MEGARA refractive VPH based spectrograph is located at one of the Nasmyth platforms. The fiber bundles conduct the light from the focal plane subsystems to the pseudo-slits at the entrance of the spectrograph. The project is an initiative led by Universidad Complutense de Madrid (Spain) in collaboration with INAOE (Mexico), IAA-CSIC (Spain) and Universidad Politécnica de Madrid (Spain) and is developed under contract with GRANTECAN. The project is carried out by a multidisciplinary and geographically distributed team, which includes the in-kind contributions of the project partners and personnel from several private companies. The MEGARA system-engineering plan has been tailored to the project and is being applied to ensure the technical control of the project in order to finally meet the science high-level requirements and GTC constrains.

  13. ELECTRONIC COMPLIANCE AND APPROVAL PROJECT (ECAP)

    Energy Technology Data Exchange (ETDEWEB)

    Hope Morgan; Richard A. Varela; Deborah LaHood; Susan Cisco; Mary Ann Benavides; Donna Burks

    2002-11-01

    The Texas Railroad Commission (RRC), working in partnership with the United States Department of Energy and the oil and gas industry it regulates, is implementing a strategy for improving efficiency in regulations and significantly reducing administrative operating costs through the Electronic Compliance and Approval Process (ECAP). The project will streamline regulatory compliance and reporting by providing the ability to electronically submit, process, and query oil and gas applications and reports through the Internet-based ECAP system. Implementation of an ECAP drilling permit pilot project began September 1999 after funding resources were secured--a $700,000 grant from the U.S. Department of Energy and an appropriation of $1.4 million from the Texas Legislature. The pilot project involves creating the ability to file, review, and approve a well's drilling permit application through a completely electronic process. The pilot project solution will ultimately provide the infrastructure, technology, and electronic modules to enable the filing of all compliance permits and performance reports through the internet from a desktop computer. The pilot project was conducted in three phases. The first phase, implemented May 2000, provided the infrastructure that allows the electronic filing and approval of simple drilling permit applications, associated fees, and attachments. The official ''roll-out'' of ECAP and the first electronically filed drilling permit application occurred on May 11, 2000 in Dallas in conjunction with an Internet Workshop sponsored by the Petroleum Technology Transfer Council. After the completion of Phase I, the ECAP team conducted an extensive review of progress to date and analyzed requirements and opportunities for future steps. The technical team identified core infrastructure modifications that would facilitate and better support future development and expansion of the ECAP system and work began on database structure

  14. Power and contexts – some societal conditions for participatory projects

    DEFF Research Database (Denmark)

    Bloch-Poulsen, Jørgen; Kristiansen, Marianne

    2014-01-01

    Based on action research co-operation with a team of teachers at a Social and Healthcare College in Denmark 2012-2013, the article raises the question: What are the conditions for organisational action research projects in a neoliberal context? The article has three purposes. Firstly, we want...... to show that mapping and delimitating relevant contexts are critical in an organisational AR project, because it is always arbitrary what you delimit as your field of inquiry, initially. The consequences of ignoring this in the project described were fatal. Secondly, the article draws attention to clashes...... with immediate and additional stakeholders questioning, among others, if the action research project is practicable at all....

  15. Between a rock and a hard place: Management and implementation teams’ expectations of project managers in an agile information systems delivery environment

    Directory of Open Access Journals (Sweden)

    Songezo Nkukwana

    2017-08-01

    Objectives: This case study investigated how project managers could adapt to agile IS implementation environments to remain relevant. Specifically, the views of their key stakeholders (the management and implementation teams were elicited to provide insights into what is expected from agile project managers. Method: A qualitative, inductive content analysis approach using purposive sampling was used to identify 13 participants (comprising management and implementation team members within a large South African insurance company. Semi-structured interviews were conducted with all participants. Results: The management and implementation teams agreed that PM remains highly relevant in an agile environment for ensuring project governance including delivery, risk management, reporting and budgeting. There was, however, disagreement between the management and implementation teams on project management interaction with the implementation team. Management preferred a command and control type project manager, while the implementation team favoured a more inclusive, facilitative PM style. Conclusion: To remain viable in an agile IS project implementation environment within large corporates, project managers need to be aware of what various stakeholders expect of them. They need to retain some of the classic PM functions while adapting to the interpersonal and collaborative requirements of the agile way.

  16. Modelling sequential Biosphere systems under Climate change for radioactive waste disposal. Project BIOCLIM

    International Nuclear Information System (INIS)

    Texier, D.; Degnan, P.; Loutre, M.F.; Lemaitre, G.; Paillard, D.; Thorne, M.

    2000-01-01

    The BIOCLIM project (Modelling Sequential Biosphere systems under Climate change for Radioactive Waste Disposal) is part of the EURATOM fifth European framework programme. The project was launched in October 2000 for a three-year period. It is coordinated by ANDRA, the French national radioactive waste management agency. The project brings together a number of European radioactive waste management organisations that have national responsibilities for the safe disposal of radioactive wastes, and several highly experienced climate research teams. Waste management organisations involved are: NIREX (UK), GRS (Germany), ENRESA (Spain), NRI (Czech Republic) and ANDRA (France). Climate research teams involved are: LSCE (CEA/CNRS, France), CIEMAT (Spain), UPMETSIMM (Spain), UCL/ASTR (Belgium) and CRU (UEA, UK). The Environmental Agency for England and Wales provides a regulatory perspective. The consulting company Enviros Consulting (UK) assists ANDRA by contributing to both the administrative and scientific aspects of the project. This paper describes the project and progress to date. (authors)

  17. A conceptual model to improve performance in virtual teams

    Directory of Open Access Journals (Sweden)

    Shopee Dube

    2016-09-01

    Full Text Available Background: The vast improvement in communication technologies and sophisticated project management tools, methods and techniques has allowed geographically and culturally diverse groups to operate and function in a virtual environment. To succeed in this virtual environment where time and space are becoming increasingly irrelevant, organisations must define new ways of implementing initiatives. This virtual environment phenomenon has brought about the formation of virtual project teams that allow organisations to harness the skills and knowhow of the best resources, irrespective of their location. Objectives: The aim of this article was to investigate performance criteria and develop a conceptual model which can be applied to enhance the success of virtual project teams. There are no clear guidelines of the performance criteria in managing virtual project teams. Method: A qualitative research methodology was used in this article. The purpose of content analysis was to explore the literature to understand the concept of performance in virtual project teams and to summarise the findings of the literature reviewed. Results: The research identified a set of performance criteria for the virtual project teams as follows: leadership, trust, communication, team cooperation, reliability, motivation, comfort and social interaction. These were used to conceptualise the model. Conclusion: The conceptual model can be used in a holistic way to determine the overall performance of the virtual project team, but each factor can be analysed individually to determine the impact on the overall performance. The knowledge of performance criteria for virtual project teams could aid project managers in enhancing the success of these teams and taking a different approach to better manage and coordinate them.

  18. Uncovering Transdisciplinary Team Project Outcomes through Ripple Effect Mapping

    Science.gov (United States)

    Daniels, Catherine H.; Chalker-Scott, Linda; Martini, Nicole

    2016-01-01

    The Garden Team at Washington State University is a transdisciplinary, geographically dispersed group of faculty and staff. As with many such teams, member retention requires effort, as busy individuals may not see the overall benefits of active team membership. Ripple effect mapping is a strategy that can illustrate the tangible and often…

  19. Building information models for astronomy projects

    Science.gov (United States)

    Ariño, Javier; Murga, Gaizka; Campo, Ramón; Eletxigerra, Iñigo; Ampuero, Pedro

    2012-09-01

    A Building Information Model is a digital representation of physical and functional characteristics of a building. BIMs represent the geometrical characteristics of the Building, but also properties like bills of quantities, definition of COTS components, status of material in the different stages of the project, project economic data, etc. The BIM methodology, which is well established in the Architecture Engineering and Construction (AEC) domain for conventional buildings, has been brought one step forward in its application for Astronomical/Scientific facilities. In these facilities steel/concrete structures have high dynamic and seismic requirements, M&E installations are complex and there is a large amount of special equipment and mechanisms involved as a fundamental part of the facility. The detail design definition is typically implemented by different design teams in specialized design software packages. In order to allow the coordinated work of different engineering teams, the overall model, and its associated engineering database, is progressively integrated using a coordination and roaming software which can be used before starting construction phase for checking interferences, planning the construction sequence, studying maintenance operation, reporting to the project office, etc. This integrated design & construction approach will allow to efficiently plan construction sequence (4D). This is a powerful tool to study and analyze in detail alternative construction sequences and ideally coordinate the work of different construction teams. In addition engineering, construction and operational database can be linked to the virtual model (6D), what gives to the end users a invaluable tool for the lifecycle management, as all the facility information can be easily accessed, added or replaced. This paper presents the BIM methodology as implemented by IDOM with the E-ELT and ATST Enclosures as application examples.

  20. Final report of the project performance assessment and economic evaluation of nuclear waste management

    International Nuclear Information System (INIS)

    Rasilainen, K.; Anttila, M.; Hautojaervi, A.

    1993-05-01

    The publication is the final report of project Performance Assessment and Economic Evaluation of Nuclear Waste Management (TOKA) at the Nuclear Engineering Laboratory of VTT (Technical Research Centre of Finland), forming part of the Publicly Financed Nuclear Waste Management Research Programme (JYT). The project covers safety and cost aspects of all phases of nuclear waste management. The main emphasis has been on developing an integrated system of models for performance assessment of nuclear waste repositories. During the four years the project has so far been in progress, the total amount of work has been around 14 person-years. Computer codes are the main tools in the project, they are either developed by the project team or acquired from abroad. In-house model development has been especially active in groundwater flow, near-field and migration modelling. The quantitative interpretation of Finnish tracer experiments in the laboratory and natural analogue studies at Palmottu support performance assessments via increased confidence in the migration concepts used. The performance assessment philosophy adopted by the team consists of deterministic modelling and pragmatic scenario analysis. This is supported by the long-term experience in practical performance assessment of the team, and in theoretical probabilistic modelling exercises. The radiological risks of spent fuel transportation from the Loviisa nuclear power plant to Russia have been analysed using a probabilistic computer code and Finnish traffic accident statistics. The project assists the authorities in the annual assessment of utility estimates of funding needs for future nuclear waste management operations. The models and methods used within the project are tested in international verification/validation projects

  1. Impact of Project Leadership Facets on Project Outcome

    Directory of Open Access Journals (Sweden)

    Arslan Ayub

    2015-08-01

    Full Text Available The study analyzes the role of project leadership facets on effective project outcome. Numerous such initiatives have already been taken on project outcome/performance in the context of apposite leadership styles or project management. However, the current study is unique in the milieu of project outcome that it introduces a new leadership approach, which throws light on the significance of variant leadership facets on project outcome. The study uses explanatory approach; primary data is collected from project management professionals working in different project organizations. The study uses structural equation model (SEM technique to test the hypothesis. The study found a positive relationship between project leadership facets and project outcome.

  2. A web-based online collaboration platform for formulating engineering design projects

    Science.gov (United States)

    Varikuti, Sainath

    Effective communication and collaboration among students, faculty and industrial sponsors play a vital role while formulating and solving engineering design projects. With the advent in the web technology, online platforms and systems have been proposed to facilitate interactions and collaboration among different stakeholders in the context of senior design projects. However, there are noticeable gaps in the literature with respect to understanding the effects of online collaboration platforms for formulating engineering design projects. Most of the existing literature is focused on exploring the utility of online platforms on activities after the problem is defined and teams are formed. Also, there is a lack of mechanisms and tools to guide the project formation phase in senior design projects, which makes it challenging for students and faculty to collaboratively develop and refine project ideas and to establish appropriate teams. In this thesis a web-based online collaboration platform is designed and implemented to share, discuss and obtain feedback on project ideas and to facilitate collaboration among students and faculty prior to the start of the semester. The goal of this thesis is to understand the impact of an online collaboration platform for formulating engineering design projects, and how a web-based online collaboration platform affects the amount of interactions among stakeholders during the early phases of design process. A survey measuring the amount of interactions among students and faculty is administered. Initial findings show a marked improvement in the students' ability to share project ideas and form teams with other students and faculty. Students found the online platform simple to use. The suggestions for improving the tool generally included features that were not necessarily design specific, indicating that the underlying concept of this collaborative platform provides a strong basis and can be extended for future online platforms

  3. Risk analysis for renewable energy projects due to constraints arising

    Science.gov (United States)

    Prostean, G.; Vasar, C.; Prostean, O.; Vartosu, A.

    2016-02-01

    Starting from the target of the European Union (EU) to use renewable energy in the area that aims a binding target of 20% renewable energy in final energy consumption by 2020, this article illustrates the identification of risks for implementation of wind energy projects in Romania, which could lead to complex technical implications, social and administrative. In specific projects analyzed in this paper were identified critical bottlenecks in the future wind power supply chain and reasonable time periods that may arise. Renewable energy technologies have to face a number of constraints that delayed scaling-up their production process, their transport process, the equipment reliability, etc. so implementing these types of projects requiring complex specialized team, the coordination of which also involve specific risks. The research team applied an analytical risk approach to identify major risks encountered within a wind farm project developed in Romania in isolated regions with different particularities, configured for different geographical areas (hill and mountain locations in Romania). Identification of major risks was based on the conceptual model set up for the entire project implementation process. Throughout this conceptual model there were identified specific constraints of such process. Integration risks were examined by an empirical study based on the method HAZOP (Hazard and Operability). The discussion describes the analysis of our results implementation context of renewable energy projects in Romania and creates a framework for assessing energy supply to any entity from renewable sources.

  4. The GalileoMobile Project

    Science.gov (United States)

    Del Pilar Becerra, A.&ída; Bhatt, Megha; Kobel, Philippe

    2012-07-01

    GalileoMobile is a traveling science education project by an international team of PhD students and recent graduates (partnering with the Universe Awareness program) that brings astronomy to young people in remote regions of developing countries. Our primary project goals are: (1) to stimulate students' curiosity and interest in learning, (2) to exchange different visions of the cosmos and cultures, and (3) to inspire a feeling of unity "under the same sky" between people from different parts of the world. In 2009, GalileoMobile traveled to 30 schools in Chile, Bolivia and Peru, bringing hands-on activities and Galileoscopes; the team also produced a documentary movie to share the experiences and culture with the world. In 2012, GalileoMobile plans an expedition to India from the 2nd to the 13th of July in villages between Bangalore and Mysore. We will again bring hands-on astronomy activities and telescopes to the schools, and share our experiences with the world via internet resources. GalileoMobile is also collaborating with the Galileo Teacher Training Program to provide workshops for local teachers, to encourage continuation of astronomy education beyond our visit. In this way, we expect to spark sustainable interest in astronomy in remote areas that have little access to science outreach, and to share the culture of these areas with the world -- "under the same sky."

  5. Consequences of team charter quality: Teamwork mental model similarity and team viability in engineering design student teams

    Science.gov (United States)

    Conway Hughston, Veronica

    relationship. Foci for future research opportunities include using: a) online data collection methods to improve participant adherence to similarity rating instructions; b) story or narratives during pre- and posttest similarity rating data collection to create common levels of contextual perception; and c) support to ensure charters are integrated into the full project life cycle, not just a pre-project one time isolated activity. Twenty five sections, on average, of EDSGN 100 are taught each spring and fall semester. Consistent instructor expectations are set for the technical aspects of the course. However, ideas to foster team effectiveness are often left to the discretion of the individual instructor. Implementing empirically tested team effectiveness instructional activities would bring consistency to EDGSN 100 curriculum. Other instructional activities that would be of benefit to engineering educators include qualitative inquiry---asking intrateam process questions (at the mid-point of the project) and in-class reflection---dedicated time, post project, to discuss what went well/not well within the team.

  6. Renewable Energy Project Development Assistance (Fact Sheet)

    Energy Technology Data Exchange (ETDEWEB)

    2013-07-01

    This fact sheet provides information on the Tribes selected to receive assistance from the U.S. Department of Energy Office of Indian Energy 2013 Strategic Technical Assistance Response Team (START) Program, which provides technical expertise to support the development of next-generation energy projects on tribal lands.

  7. The third phase of the OECD/NEA TDB project: TDB III

    International Nuclear Information System (INIS)

    Mompean, F.J.; Illemassene, M.; Perrone, J.

    2005-01-01

    In 2003 with a foreseen duration of four years. The main objective of this new phase is to extend the existing critically reviewed database for elements of relevance in radioactive waste management, paying attention to the needs of the various national programmes. Following the decision by the Project Management Board (integrated by representatives of 16 organisations with responsibilities in radioactive waste management in 12 OECD member countries) the elements contemplated in this new phase are Th, Sn and Fe, with a higher priority being allocated to inorganic species and compounds. In addition to the corresponding review teams for these elements, an additional expert team has been constituted to prepare guidelines for the evaluation of thermodynamic data for solid solutions. As was the case in TDB Phase II, the basic project review methodology remains unaltered in TDB III. The Figure illustrates the relationship between the various TDB bodies, with an International Organisation, the OECD NEA, acting as Project Coordinator and linking the independent scientific teams and the project governing bodies. This organizational paradigm has proven successful with the recent completion of the five Phase II Reviews (Update, Ni, Se, Zr and Organic Ligands). The review and expert team activities were started in 2004 (except for Fe, being started in 2005) following an initiation stage. This preliminary stage was designed in order to tailor the team compositions to the existing literature for each element. The first reviews stemming from TDB III are scheduled to appear in published form in 2007. The successful completion of these objectives will add three further reports to the current series of nine volumes (dealing with the chemical thermodynamics of U, Np, Pu, Am, Tc, Ni, Se, Zr and compounds and complexes of these elements with oxalate, citrate, EDTA and isa). (authors)

  8. Project Stakeholder Management: A Case Study of a Brazilian Science Park

    Directory of Open Access Journals (Sweden)

    Antônio Carlos Pacagnella Júnior

    2015-07-01

    Full Text Available The stakeholder management has been a topic increasingly discussed in the literature about project management, though still existing, large gaps to be filled, especially in complex projects such as the implementation of science parks. Thus, in this paper is presented a case of a Brazilian Science Park which shows how the management team of the project identified key stakeholders and established strategies for engagement and collaboration that sought to increase their engagement, get resources and make use of specific capabilities that were required during the lifecycle of the project to the reaching of its goals.

  9. Risks and opportunities management on laser Megajoule project: the development of a new knowledge

    International Nuclear Information System (INIS)

    Delafosse-Le Ber, H.; Deysson, St.; Briault, S.

    2004-01-01

    The interest of these six years spent to build the management through the Risks and the Opportunities (R and O) approach on the project Megajoule Laser as well did not hold with the practical application of a method as to the installation of a formal culture and to its evolution in time. This culture, it had to be progressively founded within a mainly technical project team. More qualitative with most quantitative aspects, the putting into practice of the R and O approach on project LMJ knew all the degrees of evolution and precision. The starting of the project saw being born the first analysis of its 'Project Risk' with a series of interviews, carried out by the Quality Manager at the time. This analysis took the shape of a technical item lists, which are identified in an empirical way. Then, some brainstorming meeting were led under the responsibility of the Technical Coordinator (which is the Project Manager assistant) in order to identify and to evaluate the 'Project Risk' on a qualitative way, but always keeping a strong technical connotation. The methodological reference of the 'Project Risk' was outlined taking into account the DGA AQ 923 without directly interaction with the other project processes (for example, the cost, the deadlines and the performance management). Initially, the project developed an Access database, which allows the storing of the risk files. Unfortunately, this database is isolated from the other project management data processing tools. In the second time, the project decided to obtain a dedicated organisation, hierarchically independent from the technical managers but however integrated into the project and attached to the assistant of the Control Project Manager. This organisation being called 'Risks and Opportunities Team', when the management of the opportunities supplemented the R and O approach. This team combines today the individual interviews and the Working Groups in order to identify and to evaluate the effects of the R

  10. THE USE OF PROJECTS IN GENERATING CHANGE IN ORGANIZATIONS

    Directory of Open Access Journals (Sweden)

    A. Vacar

    2015-10-01

    Full Text Available The article above is part of a research conducted in order to evidence the role of leaders in generating change in organizations and to observe the methods and techniques used, knowing that projects and their management are tools for implementing change in organizations. Leaders, by their influence and not by force, can determine their team to initiate new projects, considered by specialists and practitioners also, real practices of generating change in organizations.

  11. Case Studies in Application of System Engineering Practices to Capstone Projects

    Science.gov (United States)

    Murphy, Gloria; vanSusante, Paul; Carmen, Christina; Morris, Tommy; Schmidt, Peter; Zalewski, Janusz

    2011-01-01

    The Exploration Systems Mission Directorate (ESMD) of the National Aeronautics and Space Administration (NASA) sponsors a faculty fellowship program that engages researchers with interests aligned with current ESMD development programs. The faculty-members are committed to run a capstone senior design project based- on the materials and experience gained during the fellowship. For the 2010 - 2011 academic year, 5 projects were approved. These projects are in the areas of mechanical and electrical hardware design and optimization, fault prediction and extra planetary civil site preparation. This work summarizes the projects, describes the student teams performing the work, and comments on the integration of Systems Engineering principles into the projects, as well as the affected course curriculums.

  12. 75 FR 48365 - Solicitation for a Cooperative Agreement-NIC Cost Containment Online Resource Center Project

    Science.gov (United States)

    2010-08-10

    ..., or design aspects proposed that will enhance the project? Organizational (35%) Does the proposed..., organization, individual or team have the organizational capacity to complete the project tasks? Are the... there a reasonable justification for their inclusion in the project and a clear structure to ensure...

  13. Evaluation of a Team Project Based Learning Module for Developing Employability Skills

    OpenAIRE

    Janice Whatley

    2012-01-01

    This paper presents a case study, in which a new module, aimed at enhancing students’ employ-ability skills, is evaluated. Employability skills for graduates from higher education are regarded as essential outcomes from their degree programmes, but it can be difficult to provide appropriate opportunities to develop these skills in the context of their studies. This paper describes a new module, called Live Projects, designed to provide project based learning on campus, but involv-ing local bu...

  14. DSM energy saving pilot project report. Company Augstceltne Ltd., Riga, Latvia

    Energy Technology Data Exchange (ETDEWEB)

    Krievins, P.; Cakuls, A.; Kaross, V.; Jansons, D.

    1995-05-01

    This report is a part of the Joint Latvian - Danish Project DEMAND SIDE MANAGEMENT AND ENERGY SAVING. The Project is a part of the Danish aid and technology transfer to Latvia. It is the result of collaborative efforts between a Latvian team, consisting of the specialists from Latvenergo and a Danish team, which was represented by Danish Power Consult. The purpose of this pilot project was not only to carry out energy audit in the company Augstceltne Ltd and propose demand side management and energy saving measures. Another task of the project was the application of DPC energy audit methodic, measuring equipment and software in Latvian conditions and the promotion of energy saving programs in Latvia in this way. The Company Augstceltne Ltd was created to rent the rest of premises for many other independent companys and to earn money for surviving. Now the Company has 9 buildings with a total area of 26,920 square meters. The tower block has 23 floors and it is the main business centre. 66 companies are located in the building. (EG)

  15. US Climate Variability and Predictability Project

    Energy Technology Data Exchange (ETDEWEB)

    Patterson, Mike [University Corporation for Atmospheric Research (UCAR), Boulder, CO (United States)

    2017-11-14

    The US CLIVAR Project Office administers the US CLIVAR Program with its mission to advance understanding and prediction of climate variability and change across timescales with an emphasis on the role of the ocean and its interaction with other elements of the Earth system. The Project Office promotes and facilitates scientific collaboration within the US and international climate and Earth science communities, addressing priority topics from subseasonal to centennial climate variability and change; the global energy imbalance; the ocean’s role in climate, water, and carbon cycles; climate and weather extremes; and polar climate changes. This project provides essential one-year support of the Project Office, enabling the participation of US scientists in the meetings of the US CLIVAR bodies that guide scientific planning and implementation, including the scientific steering committee that establishes program goals and evaluates progress of activities to address them, the science team of funded investigators studying the ocean overturning circulation in the Atlantic, and two working groups tackling the priority research topics of Arctic change influence on midlatitude climate and weather extremes and the decadal-scale widening of the tropical belt.

  16. Action-Centered Team Leadership Influences More than Performance

    DEFF Research Database (Denmark)

    Braun, Frank C.; Avital, Michel; Martz, Ben

    2012-01-01

    Purpose – Building on a social-technical approach to project management, the authors aim to examine the effect of action-centered leadership attributes on team member's learning, knowledge collaboration and job satisfaction during IT-related projects. Design/methodology/approach – Structural...... collaboration along with individual performance and job satisfaction, and ultimately project success. Research limitations/implications – The action-centered leadership practices construct, developed in this study, can be a good surrogate measure of what is required to be an effective leader in an IT project...... equation modeling was utilized to assess the work environment of team members as well as the leadership practices of their respective project team leaders. Data were collected with a survey questionnaire from 327 team members in a variety of organizations in 15 industry sectors including financial services...

  17. Examining engineering costs for development of highway projects.

    Science.gov (United States)

    2012-12-01

    The Texas Department of Transportation (TxDOT) commissioned a research team at Texas State University-San Marcos Department of Accounting to analyze the cost of projects by determining the cost of a preliminary engineering hour necessary to develop h...

  18. Managing Geographically Dispersed Teams: From Temporary to Permanent Global Virtual Teams

    DEFF Research Database (Denmark)

    Svane Hansen, Tine; Hope, Alexander John; Moehler, Robert C.

    2012-01-01

    for organisations to move towards establishing permanent Global Virtual Teams in order to leverage knowledge sharing and cooperation across distance. To close this gap, this paper will set the scene for a research project investigating the changed preconditions for organisations. As daily face-to-face communication......The rise and spread of information communication technologies (ICT) has enabled increasing use of geographically dispersed work teams (Global Virtual Teams). Originally, Global Virtual Teams were mainly organised into temporary projects. Little research has focused on the emergent challenge...... generation of self-lead digital natives, who are already practising virtual relationships and a new approach to work, and currently joining the global workforce; and improved communication technologies. Keywords: Global Virtual teams, ICT, leadership, motivation, self-management, millenials....

  19. The impact of project management on nuclear construction lead times

    International Nuclear Information System (INIS)

    Radlaver, M.A.; Bauman, D.S.; Chapel, S.W.

    1985-01-01

    A two-year study of lead times for nuclear power plants found that construction time is affected by six fundamental influences. One of the six is project management. An analysis of construction management teams at 26 nuclear units found that many of the most successful shared five general characteristics: nuclear power experience, skill in project control, adaptability and initiative, commitment to success, and communication and coordination skill

  20. Irvine Smart Grid Demonstration, a Regional Smart Grid Demonstration Project

    Energy Technology Data Exchange (ETDEWEB)

    Yinger, Robert [Southern California Edison Company, Rosemead, CA (United States); Irwin, Mark [Southern California Edison Company, Rosemead, CA (United States)

    2015-12-29

    ISGD was a comprehensive demonstration that spanned the electricity delivery system and extended into customer homes. The project used phasor measurement technology to enable substation-level situational awareness, and demonstrated SCE’s next-generation substation automation system. It extended beyond the substation to evaluate the latest generation of distribution automation technologies, including looped 12-kV distribution circuit topology using URCIs. The project team used DVVC capabilities to demonstrate CVR. In customer homes, the project evaluated HAN devices such as smart appliances, programmable communicating thermostats, and home energy management components. The homes were also equipped with energy storage, solar PV systems, and a number of energy efficiency measures (EEMs). The team used one block of homes to evaluate strategies and technologies for achieving ZNE. A home achieves ZNE when it produces at least as much renewable energy as the amount of energy it consumes annually. The project also assessed the impact of device-specific demand response (DR), as well as load management capabilities involving energy storage devices and plug-in electric vehicle charging equipment. In addition, the ISGD project sought to better understand the impact of ZNE homes on the electric grid. ISGD’s SENet enabled end-to-end interoperability between multiple vendors’ systems and devices, while also providing a level of cybersecurity that is essential to smart grid development and adoption across the nation. The ISGD project includes a series of sub-projects grouped into four logical technology domains: Smart Energy Customer Solutions, Next-Generation Distribution System, Interoperability and Cybersecurity, and Workforce of the Future. Section 2.3 provides a more detailed overview of these domains.

  1. CTUIR Umatilla Anadromous Fisheries Habitat Project : A Columbia River Basin Fish Habitat Project 2008 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Hoverson, Eric D.; Amonette, Alexandra

    2009-02-09

    the most effective site-specific habitat restoration plan, taking into consideration the unique characteristics of each project site, and conducted in cooperation with landowners and project partners, was of paramount importance to ensure each project's success. An Aquatic Habitat Inventory was conducted from river mile 0-8 on Isquulktpe Creek and the data collected was compared with data collected in 1994. Monitoring plans will continue throughout the duration of each project to oversee progression and inspire timely managerial actions. Twenty-seven conservation easements were maintained with 23 landowners. Permitting applications for planned project activities and biological opinions were written and approved. Project activities were based on a variety of fisheries monitoring techniques and habitat assessments used to determine existing conditions and identify factors limiting anadromous salmonid abundance in accordance with the Umatilla River Subbasin Salmon and Steelhead Production Plan (NPPC 1990) and the Final Umatilla Willow Subbasin Plan (Umatilla/Willow Subbasin Planning Team 2005).

  2. Validation of Early Detection Ovarian Cancer Biomarkers (Team Project) — EDRN Public Portal

    Science.gov (United States)

    Early detection of Ovarian Cancer (OC) is one of the key clinical problems in this disease. We propose a team EDRN project to address the issue of early detection of OC by performing a validation study on candidate protein markers already identified in previous EDRN research or in the literature (e.g. protein products of TCGA identified mutations specific to ovarian cancer). (See appendix for full listing) Biospecimen sources have been identified which include samples obtained at diagnosis and matched controls (Urban, Godwin, Marks, Skates), and longitudinal samples obtained prior to diagnosis (Urban, Skates, Godwin). Bioinformatic filters will be applied to rank the candidates (Diamandis). In order of ranking, candidate proteins for which high quality antibodies are available will be measured by development of ELISAs at JHU (Chan/Zhang) or through NAPPA at DFCI (Anderson/LaBaer), while for other candidates mass spectrometry based selective reaction monitoring (SRM) assays will be developed at PNNL (Rodland). Three milestones are defined. The first two milestones are to assemble the necessary specimens and to develop the qualifying assay(s). The final milestone is to estimate the markers’ sensitivity one year prior to diagnosis at a given high specificity.

  3. Experiences with project-oriented research in graduate engineering education

    International Nuclear Information System (INIS)

    Miley, G.H.

    1976-01-01

    Two examples of project-oriented research that involve the conceptual design of fusion systems are described. One of these projects involved close collaboration with workers in a national laboratory while the second was formally organized as a cooperative effort with two other laboratories. An important educational aspect of such research is that the students are involved in a design team composed of both students and professionals facing a realistic problem. In retrospect, it appears that both students and faculty profited from the experience. Several students have taken jobs in related areas, and additional research has resulted at the University from new insight gained during the projects

  4. From project management to project leadership

    NARCIS (Netherlands)

    Braun, F.; Avital, M.

    2010-01-01

    It is virtually a truism that good leadership practices can help project managers with attaining the desired project outcome. However, a better understanding of which leadership practices enable project managers to be more effective warrants further investigation. Subsequently, in this study, we

  5. Ace Project as a Project Management Tool

    Science.gov (United States)

    Cline, Melinda; Guynes, Carl S.; Simard, Karine

    2010-01-01

    The primary challenge of project management is to achieve the project goals and objectives while adhering to project constraints--usually scope, quality, time and budget. The secondary challenge is to optimize the allocation and integration of resources necessary to meet pre-defined objectives. Project management software provides an active…

  6. American fuel cell bus project : first analysis report.

    Science.gov (United States)

    2013-06-01

    This report summarizes the experience and early results from the American Fuel Cell Bus Project, a fuel cell electric bus demonstration : funded by the Federal Transit Administration (FTA) under the National Fuel Cell Bus Program. A team led by CALST...

  7. Lightning Mapper Sensor Lens Assembly S.O. 5459: Project Management Plan

    Science.gov (United States)

    Zeidler, Janet

    1999-01-01

    Kaiser Electro-Optics, Inc. (KEO) has developed this Project Management Plan for the Lightning Mapper Sensor (LMS) program. KEO has integrated a team of experts in a structured program management organization to meet the needs of the LMS program. The project plan discusses KEO's approach to critical program elements including Program Management, Quality Assurance, Configuration Management, and Schedule.

  8. Collaborative Learning with Sustainability-driven Projects: A Summary of the EPS@ISEP Programme

    Directory of Open Access Journals (Sweden)

    Manuel Fernando Silva

    2018-06-01

    Full Text Available This paper describes the collaborative learning environment, aligned with the United Nations Millennium Development Goals, provided by the European Project Semester (EPS. EPS is a one semester capstone project programme offered by eighteen European engineering schools as part of their student ex-change programme portfolio. In this international programme, students are organized in teams, grouping individuals from diverse academic backgrounds and nationalities. The teams, after choosing a project proposal, become fully responsible for the conduction of their projects. By default, project proposals refer to open multidisciplinary real problems. The purpose of the project is to expose students to problems of a greater dimension and complexity than those faced throughout the degree programme as well as to put them in con-tact with the so-called real world, in opposition to the academic world. EPS provides an integrated framework for undertaking capstone projects, which is focused on multicultural and multidisciplinary teamwork, communication, problem-solving, creativity, leadership, entrepreneurship, ethical reasoning and global contextual analysis. Specifically, the design and development of sustainable systems for growing food allow students not only to reach the described objectives, but to foster sustainable development practices. As a re-sult, we recommend the adoption of this category of projects within EPS for the benefit of engineering students and of the society as a whole.

  9. Projective-anticipating, projective and projective-lag synchronization of chaotic systems with time-varying delays

    International Nuclear Information System (INIS)

    Feng Cunfang; Guan Wei; Wang Yinghai

    2013-01-01

    We investigate different types of projective (projective-anticipating, projective and projective-lag) synchronization in unidirectionally nonlinearly coupled time-delayed chaotic systems with variable time delays. Based on the Krasovskii–Lyapunov approach, we find both the existence and sufficient stability conditions, using a general class of time-delayed chaotic systems related to optical bistable or hybrid optical bistable devices. Our method has the advantage that it requires only one nonlinearly coupled term to achieve different types of projective synchronization in time-delayed chaotic systems with variable time delays. Compared with other existing works, our result provides an easy way to achieve projective-anticipating, projective and projective-lag synchronization. Numerical simulations of the Ikeda system are given to demonstrate the validity of the proposed method. (paper)

  10. Features of conflict sensitivity implementation mechanisms’ in the public sector projects

    Directory of Open Access Journals (Sweden)

    T. V. Маматоvа

    2017-08-01

    Full Text Available It has been found in the study that potential conflicts are natural for public sector projects. Among the factors, that predetermine it, one can distinguish the following: the opposite to the processes of making changes; competition of participants during the allocation of project resources; different opportunities to access the project product; insufficient consideration of interested parties’ interests; context conflicts; directing the project to resolve the conflict in the territory; unsuccessful selection of the project team. Consequently, the article deals with the issues related to the definition of the peculiarities of the «conflict sensitivity» implementation mechanisms in the public sector projects. This topic has not been studied thoroughly in the specialized publications on public administration in Ukraine. Definitions of main related categories of the «conflict sensitivity» domain based on Conflict Sensitivity Consortium guidelines have been described in the study: «conflict sensitivity», «conflict», «conflict analysis», «conflict sensitivity analysis». The main ideas on the peculiarities of conflict-sensitive project / program management implementation mechanisms in the context of ensuring the success of local development projects by the integration of «conflict sensitivity» into all three phases of the project cycle, under which the intervention is implemented, are as follows: conflict-sensitive planning; conflict-sensitive implementation; conflict-sensitive monitoring and evaluation. The example of the conflict-sensitive project management use is: EUNPACK international project «Good intentions, mixed results – A conflict sensitive understanding of the EU comprehensive approach to conflict and crisis mechanisms», which aims to develop recommendations on the improvement of the EU crises response mechanisms by the increase of their sensitivity to conflict and context. As a result, prospects for further research

  11. Tinkering self-efficacy and team interaction on freshman engineering design teams

    Science.gov (United States)

    Richardson, Arlisa Labrie

    This study utilizes Bandura's theory of self-efficacy as a framework to examine the development of tinkering skills white working on a freshman engineering design team. The four sources of self-efficacy were analyzed in the context of tinkering within the design team. The research question, 'Does tinkering self-efficacy change for female students during the Freshman Engineering Design class while working on mixed sex teams?', was addressed using quantitative data collection and field observations. Approximately 41 students enrolled in a freshman engineering design class at a public university in the southwest participated by providing self-reports about their tinkering involvement during each design project. In addition, three mixed-sex student teams were observed while working to complete the course design projects. An observation protocol based on Bandura's sources of self efficacy, was used to document tinkering interactions within the three observed teams. The results revealed that Bandura's sources of self-efficacy influenced tinkering involvement. The self-efficacy source, performance accomplishment measured through prior tinkering experience, was the most influential on tinkering involvement. Unlike Bandura's ranking of influence, verbal persuasion was shown to correlate with more tinkering behaviors than the observation of others. The number of females on a team had no impact on tinkering involvement. Tinkering involvement did not change as students progressed from one project to another. However, the competitive nature of the design project appeared to have a negative impact on tinkering involvement and the division of tasks within the team. In addition, a difference was found in the female students' perception of their tinkering involvement and observation of their tinkering involvement. The findings suggest that effective implementation of teamwork including teamwork preparation, more emphasis on the design process and the elimination of competition

  12. One System Integrated Project Team: Retrieval And Delivery Of The Hanford Tank Wastes For Vitrification In The Waste Treatment Plant

    Energy Technology Data Exchange (ETDEWEB)

    Harp, Benton J. [Department of Energy, Office of River Protection, Richland, Washington (United States); Kacich, Richard M. [Bechtel National, Inc., Richland, WA (United States); Skwarek, Raymond J. [Washington River Protection Solutions LLC, Richland, WA (United States)

    2012-12-20

    The One System Integrated Project Team (IPT) was formed in late 2011 as a way for improving the efficiency of delivery and treatment of highly radioactive waste stored in underground tanks at the U.S. Department of Energy's (DOE's) 586-square-mile Hanford Site in southeastern Washington State. The purpose of the One System IPT is to improve coordination and integration between the Hanford's Waste Treatment Plant (WTP) contractor and the Tank Operations Contractor (TOC). The vision statement is: One System is a WTP and TOC safety conscious team that, through integrated management and implementation of risk-informed decision and mission-based solutions, will enable the earliest start of safe and efficient treatment of Hanford's tank waste, to protect the Columbia River, environment and public. The IPT is a formal collaboration between Bechtel National, Inc. (BNI), which manages design and construction of the WTP for the U.S. Department of Energy's Office of River Protection (DOEORP), and Washington River Protection Solutions (WRPS), which manages the TOC for ORP. More than fifty-six (56) million gallons of highly radioactive liquid waste are stored in one hundred seventy-seven (177) aging, underground tanks. Most of Hanford's waste tanks - one hundred forty-nine (149) of them - are of an old single-shell tank (SST) design built between 1944 and 1964. More than sixty (60) of these tanks have leaked in the past, releasing an estimated one million gallons of waste into the soil and threatening the nearby Columbia River. There are another twenty-eight (28) new double-shelled tanks (DSTs), built from 1968 to 1986, that provide greater protection to the environment. In 1989, DOE, the U.S. Environmental Protection Agency (EPA), and the Washington State Department of Ecology (Ecology) signed a landmark agreement that required Hanford to comply with federal and state environmental standards. It also paved the way for agreements that set deadlines for retrieving the tank

  13. One System Integrated Project Team: Retrieval And Delivery Of The Hanford Tank Wastes For Vitrification In The Waste Treatment Plant

    International Nuclear Information System (INIS)

    Harp, Benton J.; Kacich, Richard M.; Skwarek, Raymond J.

    2012-01-01

    The One System Integrated Project Team (IPT) was formed in late 2011 as a way for improving the efficiency of delivery and treatment of highly radioactive waste stored in underground tanks at the U.S. Department of Energy's (DOE's) 586-square-mile Hanford Site in southeastern Washington State. The purpose of the One System IPT is to improve coordination and integration between the Hanford's Waste Treatment Plant (WTP) contractor and the Tank Operations Contractor (TOC). The vision statement is: One System is a WTP and TOC safety conscious team that, through integrated management and implementation of risk-informed decision and mission-based solutions, will enable the earliest start of safe and efficient treatment of Hanford's tank waste, to protect the Columbia River, environment and public. The IPT is a formal collaboration between Bechtel National, Inc. (BNI), which manages design and construction of the WTP for the U.S. Department of Energy's Office of River Protection (DOEORP), and Washington River Protection Solutions (WRPS), which manages the TOC for ORP. More than fifty-six (56) million gallons of highly radioactive liquid waste are stored in one hundred seventy-seven (177) aging, underground tanks. Most of Hanford's waste tanks - one hundred forty-nine (149) of them - are of an old single-shell tank (SST) design built between 1944 and 1964. More than sixty (60) of these tanks have leaked in the past, releasing an estimated one million gallons of waste into the soil and threatening the nearby Columbia River. There are another twenty-eight (28) new double-shelled tanks (DSTs), built from 1968 to 1986, that provide greater protection to the environment. In 1989, DOE, the U.S. Environmental Protection Agency (EPA), and the Washington State Department of Ecology (Ecology) signed a landmark agreement that required Hanford to comply with federal and state environmental standards. It also paved the way for agreements that set deadlines for retrieving the tank

  14. One System Integrated Project Team: Retrieval and Delivery of Hanford Tank Wastes for Vitrification in the Waste Treatment Plant - 13234

    International Nuclear Information System (INIS)

    Harp, Benton J.; Kacich, Richard M.; Skwarek, Raymond J.

    2013-01-01

    The One System Integrated Project Team (IPT) was formed in late 2011 as a way for improving the efficiency of delivery and treatment of highly radioactive waste stored in underground tanks at the U.S. Department of Energy's (DOE's) 586-square-mile Hanford Site in southeastern Washington State. The purpose of the One System IPT is to improve coordination and integration between the Hanford's Waste Treatment Plant (WTP) contractor and the Tank Operations Contractor (TOC). The vision statement is: One System is a WTP and TOC safety-conscious team that, through integrated management and implementation of risk-informed decision and mission-based solutions, will enable the earliest start of safe and efficient treatment of Hanford's tank waste, to protect the Columbia River, environment and public. The IPT is a formal collaboration between Bechtel National, Inc. (BNI), which manages design and construction of the WTP for the U.S. Department of Energy's Office of River Protection (DOEORP), and Washington River Protection Solutions (WRPS), which manages the TOC for ORP. More than fifty-six (56) million gallons of highly radioactive liquid waste are stored in one hundred seventy-seven (177) aging, underground tanks. Most of Hanford's waste tanks - one hundred forty-nine (149) of them - are of an old single-shell tank (SST) design built between 1944 and 1964. More than sixty (60) of these tanks have leaked in the past, releasing an estimated one million gallons of waste into the soil and threatening the nearby Columbia River. There are another twenty-eight (28) new double-shelled tanks (DSTs), built from 1968 to 1986, that provide greater protection to the environment. In 1989, DOE, the U.S. Environmental Protection Agency (EPA), and the Washington State Department of Ecology (Ecology) signed a landmark agreement that required Hanford to comply with federal and state environmental standards. It also paved the way for agreements that set deadlines for retrieving the tank

  15. One System Integrated Project Team: Retrieval and Delivery of Hanford Tank Wastes for Vitrification in the Waste Treatment Plant - 13234

    Energy Technology Data Exchange (ETDEWEB)

    Harp, Benton J. [U.S. Department of Energy, Office of River Protection, Post Office Box 550, Richland, Washington 99352 (United States); Kacich, Richard M. [Bechtel National, Inc., 2435 Stevens Center Place, Richland, Washington 99354 (United States); Skwarek, Raymond J. [Washington River Protection Solutions LLC, Post Office Box 850, Richland, Washington 99352 (United States)

    2013-07-01

    The One System Integrated Project Team (IPT) was formed in late 2011 as a way for improving the efficiency of delivery and treatment of highly radioactive waste stored in underground tanks at the U.S. Department of Energy's (DOE's) 586-square-mile Hanford Site in southeastern Washington State. The purpose of the One System IPT is to improve coordination and integration between the Hanford's Waste Treatment Plant (WTP) contractor and the Tank Operations Contractor (TOC). The vision statement is: One System is a WTP and TOC safety-conscious team that, through integrated management and implementation of risk-informed decision and mission-based solutions, will enable the earliest start of safe and efficient treatment of Hanford's tank waste, to protect the Columbia River, environment and public. The IPT is a formal collaboration between Bechtel National, Inc. (BNI), which manages design and construction of the WTP for the U.S. Department of Energy's Office of River Protection (DOEORP), and Washington River Protection Solutions (WRPS), which manages the TOC for ORP. More than fifty-six (56) million gallons of highly radioactive liquid waste are stored in one hundred seventy-seven (177) aging, underground tanks. Most of Hanford's waste tanks - one hundred forty-nine (149) of them - are of an old single-shell tank (SST) design built between 1944 and 1964. More than sixty (60) of these tanks have leaked in the past, releasing an estimated one million gallons of waste into the soil and threatening the nearby Columbia River. There are another twenty-eight (28) new double-shelled tanks (DSTs), built from 1968 to 1986, that provide greater protection to the environment. In 1989, DOE, the U.S. Environmental Protection Agency (EPA), and the Washington State Department of Ecology (Ecology) signed a landmark agreement that required Hanford to comply with federal and state environmental standards. It also paved the way for agreements that set deadlines

  16. Managing Large Scale Project Analysis Teams through a Web Accessible Database

    Science.gov (United States)

    O'Neil, Daniel A.

    2008-01-01

    Large scale space programs analyze thousands of requirements while mitigating safety, performance, schedule, and cost risks. These efforts involve a variety of roles with interdependent use cases and goals. For example, study managers and facilitators identify ground-rules and assumptions for a collection of studies required for a program or project milestone. Task leaders derive product requirements from the ground rules and assumptions and describe activities to produce needed analytical products. Disciplined specialists produce the specified products and load results into a file management system. Organizational and project managers provide the personnel and funds to conduct the tasks. Each role has responsibilities to establish information linkages and provide status reports to management. Projects conduct design and analysis cycles to refine designs to meet the requirements and implement risk mitigation plans. At the program level, integrated design and analysis cycles studies are conducted to eliminate every 'to-be-determined' and develop plans to mitigate every risk. At the agency level, strategic studies analyze different approaches to exploration architectures and campaigns. This paper describes a web-accessible database developed by NASA to coordinate and manage tasks at three organizational levels. Other topics in this paper cover integration technologies and techniques for process modeling and enterprise architectures.

  17. Project Success in Agile Development Software Projects

    Science.gov (United States)

    Farlik, John T.

    2016-01-01

    Project success has multiple definitions in the scholarly literature. Research has shown that some scholars and practitioners define project success as the completion of a project within schedule and within budget. Others consider a successful project as one in which the customer is satisfied with the product. This quantitative study was conducted…

  18. DECOVALEX II PROJECT. Technical report - Task 1A and 1B

    International Nuclear Information System (INIS)

    Lanru Jing; Stephansson, Ove; Kautsky, F.

    1998-08-01

    DECOVALEX II project started in November 1995 as a continuation of the DECOVALEX I project, which was completed at the end of 1994. The project was initiated by recognizing the fact that a proper evaluation of the current capacities of numerical modelling of the coupled T-H-M processes in fractured media is needed not only for small scale, well controlled laboratory test cases such as those studied in DECOVALEX I, but also for less characterised, more complex and realistic in-situ experiments. This will contribute to validation and confidence building in the current mathematical models, numerical methods and computer codes. Four tasks were defined in the DECOVALEX II project: TASK 1 - numerical study of the RCF3 pumping test and shaft excavation at Sellafield by Nirex, UK; TASK 2 - numerical study of the in-situ T-H-M experiments at Kamaishi Mine by PNC, Japan; TASK 3 - review of current state-of-the-art of rock joint research and TASK 4 - report on the coupled T-H-M issues related to repository design and performance assessment. This report is one of the technical reports of the DECOVALEX II project, describing the work performed for TASK 1A and 1B - the predictions and model calibrations for the RCF 3 pumping test at Sellafield. Presented in this report are the descriptions of the project, tasks, approaches, methods and results of numerical modelling work carried out by the research teams. The report is a summary of the research reports written by the research teams and submitted to the project secretariat, and the discussions held during project workshops and task force group meetings. The opinions and conclusions in this report, however, reflect only ideas of the authors, not necessarily a collective representation of the funding organisations of the project

  19. An IS Project Management Course Project

    Science.gov (United States)

    Frank, Ronald L.

    2010-01-01

    Information Systems curricula should provide project management (PM) theory, current practice, and hands-on experience. The schedule usually does not allow time in Analysis and Design courses for development oriented project management instruction other than a short introduction. Similarly, networking courses usually don't put project management…

  20. Evaluation of Project Achievements in VOMARE -project

    OpenAIRE

    Kokkarinen, Eeva

    2011-01-01

    The purpose of the thesis is to study the achievements of VOMARE –project from the Finnish Lifeboat Institutions perspective. The organisation is a roof organisation for voluntary maritime rescue operation in Finland. The Finnish Lifeboat Institution is a lead partner in VOMARE –project which is EU funded project and the aim of the project is to start voluntary rescue operations in Estonia. The theoretical part of the work is divided into two main categories; project management and planni...