  1. Project Management Performance Drivers

    OpenAIRE

    Ra’ad, Mohammed A.; Najdawi, Mohammad K.

    2010-01-01

    The practice of project management has gained enormous importance over the past several years in various business industries. “In industries as diverse as pharmaceuticals, software, and aerospace, projects drive business” (Wheatley). This gain of importance can be attributed to the magnitude of the impact project performance results in terms of time, cost, and scope have over the project performing entity. “On the basis of data released by the Bureau of Economic Analysis, part of the US De...

  2. Project management and performance management: potential transdisciplinary contributions

    Directory of Open Access Journals (Sweden)

    Gerrit van der Waldt

    2012-12-01

    Full Text Available As project management and performance management as management applications gain momentum in public sector settings, the question often arise as to if, how, and when these applications should complement each other in various policy implementation and service delivery initiatives. Answers to this question should be sought from various vantage points or perspectives. These vantage points may range from macro, meso, micro as well as theoretical-methodological perspectives. The purpose of this paper is to unlock the potential for transdisciplinary contributions between Project Management and Performance Management by focusing on the methodologies, functional areas, and practical applications of both management disciplines. It is argued that the respective methodologies and their processes should be unpacked to identify the timing or moment when each discipline could, and should, make a contribution to the success of the other. This will add value to the theoretical underpinnings and practical applications of both study domains in the public sector. The respective contributions are illustrated by means of application realities of both management practices in the South African Public Service. Keywords: project management, performance management, Public Sector applications, transdisciplinarity Disciplines: project management, performance management

  3. Prototype road weather performance management tool : project report : draft report.

    Science.gov (United States)

    2016-09-30

    This report is the Project Report for the Road Weather Performance Management (RW-PM) Tool developed for the project on Development and Demonstration of a Prototype Road Weather Performance Management Application that Uses Connected Vehicle Data (RW-...

  4. Project management – the way to performance among corporations

    Directory of Open Access Journals (Sweden)

    Luminiţa PISTOL

    2012-06-01

    Full Text Available Project management has developed from a simple management philosophy restricted to a few functional areas into a business process that include various areas from global market. Nowadays, most of the corporations are using project management systems to achieve performance on the global market, and they realize that project management and productivity are related.

  5. Managing teams performing complex innovation projects

    NARCIS (Netherlands)

    Oeij, P.R.A.; Vroome, E.M.M. de; Dhondt, S.; Gaspersz, J.B.R.

    2012-01-01

    Complexity of projects is hotly debated and a factor which affects innovativeness of team performance. Much attention in the past is paid to technical complexity and many issues are related to natural and physical sciences. A growing awareness of the importance of socio-organisational issues is

  6. Use of safety management practices for improving project performance.

    Science.gov (United States)

    Cheng, Eddie W L; Kelly, Stephen; Ryan, Neal

    2015-01-01

    Although site safety has long been a key research topic in the construction field, there is a lack of literature studying safety management practices (SMPs). The current research, therefore, aims to test the effect of SMPs on project performance. An empirical study was conducted in Hong Kong and the data collected were analysed with multiple regression analysis. Results suggest that 3 of the 15 SMPs, which were 'safety committee at project/site level', 'written safety policy', and 'safety training scheme' explained the variance in project performance significantly. Discussion about the impact of these three SMPs on construction was provided. Assuring safe construction should be an integral part of a construction project plan.

  7. Project management metrics, KPIs, and dashboards a guide to measuring and monitoring project performance

    CERN Document Server

    Kerzner, Harold

    2013-01-01

    Today, with the growth of complex projects, stakeholder involvement in projects, advances in computer technology for dashboard designs, metrics, and key performance indicators for project management have become an important focus. This Second Edition of the bestselling book walks readers through everything from the basics of project management metrics and key performance indicators to establishing targets and using dashboards to monitor performance. The content is aligned with PMI's PMBOK Guide and stresses "value" as the main focal point.

  8. Project Manager Performance and the Decision to Backsource the Project Management Office

    Science.gov (United States)

    Lively, William R.

    2014-01-01

    This paper reviews a management decision of an Information Technology Outsource (ITO) provider to backshore the management oversight of its Project Management Office (PMO) after only one year of offshore operations. Governance is a term used in project management to refer to management oversight. The review is a quantitative analysis of existing…

  9. Relationship between time management in construction industry and project management performance

    Science.gov (United States)

    Nasir, Najuwa; Nawi, Mohd Nasrun Mohd; Radzuan, Kamaruddin

    2016-08-01

    Nowadays, construction industry particularly in Malaysia struggle in achieving status of eminent time management for construction project. Project managers have a great responsibility to keep the project success under time of project completion. However, studies shows that delays especially in Malaysian construction industry still unresolved due to weakness in managing the project. In addition, quality of time management on construction projects is generally poor. Due to the progressively extended delays issue, time performance becomes an important subject to be explored to investigate delay factors. The method of this study is review of literature towards issues in construction industry which affecting time performance of project in general by focusing towards process involved for project management. Based on study, it was found that knowledge, commitment, cooperation are the main criteria as an overall to manage the project into a smooth process during project execution until completion. It can be concluded that, the strength between project manager and team members in these main criteria while conducting the project towards good time performance is highly needed. However, there is lack of establishment towards factors of poor time performance which strongly related with project management. Hence, this study has been conducted to establish factors of poor time performance and its relations with project management.

  10. Project management metrics, KPIs, and dashboards a guide to measuring and monitoring project performance

    CERN Document Server

    Kerzner, Harold

    2017-01-01

    With the growth of complex projects, stakeholder involvement, and advancements in visual-based technology, metrics and KPIs (key performance indicators) are key factors in evaluating project performance. Dashboard reporting systems provide accessible project performance data, and sharing this vital data in a concise and consistent manner is a key communication responsibility of all project managers. This 3rd edition of Kerzner’s groundbreaking work includes the following updates: new sections on processing dashboard information, portfolio management PMO and metrics, and BI tool flexibility. PPT decks by chapter and a test bank will be available for use in seminar presentations and courses.

  11. Key aspects to perform a project on energy management

    International Nuclear Information System (INIS)

    Bachini, R.

    1993-01-01

    A general overview on elements and organisms playing a key role to launch a new industrial project is given, taking as base case an energy management project. Likewise the problematic of training personnel involved in the project is analyzed. Energy management becomes crucial in industries where energy costs represent a big portion of the whole production cost. Main aspects to be analyzed are: - Adequate production procedures to be competitive - Environment protection regarding waste management - Maximization of safety at production installations. (Author)

  12. Relation of project managers' personality and project performance: An approach based on value stream mapping

    Directory of Open Access Journals (Sweden)

    Maurizio Bevilacqua

    2014-09-01

    Full Text Available Purpose: This work investigates the influence of project managers’ personality on the success of a project in a Multinational Corporation. The methodology proposed for analyzing the project managers’ personality is based on the Myers-Briggs Type Indicator.Design/methodology/approach: Forty projects carried out in 2012 by multinational corporation, concerning new product development (NPD, have been analyzed, comparing the profile of project managers with results obtained in terms of traditional performance indexes (time delay and over-budget of projects and performance indexes usually used in “Lean Production” sector (waste time and type of “wastes”. A detailed analysis of the most important “wastes” during the project development is carried out using the Value Stream Mapping (VSM technique.Findings and Originality/value: Relying on the Myers–Briggs personality instrument, results show that extroverted managers (as opposed to introverted managers carry out projects that show lower delay and lower waste time. Introverted managers often make “Over-processing” and “Defect” types of waste. Moreover, lower delay and over-budget have been shown by perceiving managers.Research limitations: Regarding the limitations of this work it is necessary to highlight that we collected data from project managers in a retrospective way. While we believe that several aspects of our data collection effort helped enhance the accuracy of the results, future research could conduct real-time case study research to get more detailed insights into the proposed relationships and avoid retrospective bias. Moreover we focused on a single respondent, the project manager. This helped us ensure that their interpretations played an important role in product development. But, we cannot examined the opinion of team members that could be different from project managers opinion regarding some questions.Originality/value: This research provides insight useful

  13. Managing project complexity : A study into adapting early project phases to improve project performance in large engineering projects

    NARCIS (Netherlands)

    Bosch-Rekveldt, M.G.C.

    2011-01-01

    Engineering projects become increasingly more complex and project complexity is assumed to be one of the causes for projects being delivered late and over budget. However, what this project complexity actually comprised of was unclear. To improve the overall project performance, this study focuses

  14. Project Management

    DEFF Research Database (Denmark)

    Project Management Theory Meets Practice contains the proceedings from the 1st Danish Project Management Research Conference (DAPMARC 2015), held in Copenhagen, Denmark, on May 21st, 2015.......Project Management Theory Meets Practice contains the proceedings from the 1st Danish Project Management Research Conference (DAPMARC 2015), held in Copenhagen, Denmark, on May 21st, 2015....

  15. Project Management

    DEFF Research Database (Denmark)

    Pilkington, Alan; Chai, Kah-Hin; Le, Yang

    2015-01-01

    This paper identifies the true coverage of PM theory through a bibliometric analysis of the International Journal of Project Management from 1996-2012. We identify six persistent research themes: project time management, project risk management, programme management, large-scale project management......, project success/failure and practitioner development. These differ from those presented in review and editorial articles in the literature. In addition, topics missing from the PM BOK: knowledge management project-based organization and project portfolio management have become more popular topics...

  16. A multilevel study of the impact of project manager's leadership on extra-role performance of project team members

    Science.gov (United States)

    Shokory, Suzyanty Mohd; Suradi, Nur Riza Mohd

    2018-04-01

    The current study examines the impact of transformational and transactional leadership of project manager on the extra-role performance of project team members. In addition, this study also identifies factor dominant to extra-role performance of project team members when the transformational and transactional leadership of project managers are analyzed simultaneously. The study involved 175 of project team members from 35 project teams (each project team consists of different contracting companies registered in the Selangor (N = 175 from 35 contractors company). A multilevel analysis with hierarchical linear modeling (HLM) approach was used in this study. The analysis showed that transformational and transactional leadership of the project manager is a positive significant with extra-role performance project team members when analyzed separately. However when the two constructs (transformational leadership and transactional leadership of project manager) were analyzed simultaneously, transformational leadership was found to have more impact on extra-role performance project team members compared to transactional leadership. These findings explained that although transformational and transactional leadership of project managers can improve extra-role performance project team members, but this study has proved that transformational leadership of project managers affect extra-role performance project team members more as compared to transactional leadership.

  17. Organizational Performance: Integration of the Value, Rarity, Imitability and Organization Framework in Project Management

    Directory of Open Access Journals (Sweden)

    Ronielton Rezende Oliveira

    2017-08-01

    Full Text Available Organizational performance is often associated with competitive advantage. In strategy studie saimed at expanding communication on a global vision of organizations and their initiatives, strategic project management stands out, whichis related to the mechanisms and set of management decisions that determine long term organizational performance. This study verify how the Resource-based view adds value to organizational initiatives seeking to achieve organizational performance through projects. The study considers strategic management practiced by the project managers o asto present a conceptual framework with four propositions that demonstrate the integration of the Value, Rarity, Imitability and Organization framework with project management and its relations to organizational performance.

  18. Cost Control and Performance Review of Software Projects by Using the Earned Value Management

    Directory of Open Access Journals (Sweden)

    Felician ALECU

    2014-08-01

    Full Text Available EVM (Earned Value Management is a method that can be successfully used to measure the performance of a project from the cost and schedule points of view. Initially developed for the US government programs in the 60s, it later becomes an important feature of any modern project management practice thanks to its simplicity and efficiency in signaling project anomalies in time. EVM become extremely popular because it can be equally applied for any project in any industry.

  19. Project Management

    DEFF Research Database (Denmark)

    Kampf, Constance

    2009-01-01

    In this video Associate Professor Constance Kampf talks about the importance project management. Not only as a tool in implementation, but also as a way of thinking, and as something that needs to be considered from idea conception......In this video Associate Professor Constance Kampf talks about the importance project management. Not only as a tool in implementation, but also as a way of thinking, and as something that needs to be considered from idea conception...

  20. Managing projects using a project management approach

    Directory of Open Access Journals (Sweden)

    Marko D. Andrejić

    2011-04-01

    Full Text Available Modern management theory treats all complex tasks and duties like projects and make these projects possible to be managed by a particular organizational-management concept in order to achieve a goal effectively. A large number of jobs and tasks performed in the system of defense or for defense purposes have the characteristics of projects. Project management is both a skill and a science of monitoring human, material, financial, energy and other resources to achieve required objectives within the given limits: deadlines, time, budget, possibility of realization and the satisfaction of the interests of all project participants. Project management is a traditional area of applied (or functional management focused on managing complex and uncertain situations with defined goals. Introduction In conditions of rapid change and high uncertainty, only adaptive organizations survive, i. e. those that are able not only to react quickly to changes but also to proactively take advantage of changes. Development of project management The biggest influence on the development of the area had complex jobs within the engineering profession. In parallel with the traditional approach new approaches began to develop, while the traditional one still remained in use. Contrary to the traditional engineering approach, a dynamic model first developed in order to respond to demands for greater control of costs. Project management Project management is a skill and knowledge of human and material resources to achieve set objectives within prescribed limits: deadlines, time, budget, possibility of realization, and the satisfaction of all participants in the project. In order to realize a project effectively, it is necessary to manage it rationally. Planning and project management A project plan is a document that allows all team members insight on where to go, when to start and when to arrive, what is necessary to be done in order to achieve the project objectives and what

  1. Using Project Performance to Measure Effectiveness of Quality Management System Maintenance and Practices in Construction Industry

    OpenAIRE

    Tiong Kung Leong; Norhayati Zakuan; Muhamad Zameri Mat Saman; Mohd. Shoki Md. Ariff; Choy Soon Tan

    2014-01-01

    This paper proposed seven existing and new performance indicators to measure the effectiveness of quality management system (QMS) maintenance and practices in construction industry. This research is carried out with a questionnaire based on QMS variables which are extracted from literature review and project performance indicators which are established from project management's theory. Data collected was analyzed using correlation and regression analysis. The findings indicate that client sat...

  2. The influences of attributes, skills and knowledge of managers on refurbishment project performance

    Science.gov (United States)

    Ishak, Nurfadzillah

    2018-02-01

    Recently, the momentum on the growth of national building industry shows the increasing of the demand in refurbishment works becomes a trend spreading over the Malaysia. However, the potential of these activities normally related with the complexity in technical aspect compared to new build schemes. It will be reflecting on the unsatisfactory project performance. A competent manager is required to have the appropriate attributes, skills and knowledge in able to perform all the duties associated with managing the refurbishment building projects. Therefore, this paper is to identify the most appropriate attributes, skills and knowledge that required for managers to indicate the relationship between the influences on the refurbishment projects performance. This finding is indicate the importance of development the personal attributes, skills, and knowledge of managers and adds as benefit of raising the profile and image of managers in refurbishment building industry through a dissemination of the findings.

  3. The Hybrid Management Model: Influences of Organizational Structure and IT Project Management Practices on the Performance of Federal IT Projects

    Science.gov (United States)

    Neves, Celine A.

    2012-01-01

    The federal government spends much money on information technology (IT) projects each year, yet numerous IT projects continue to underperform. For instance, in Fiscal Year 2008, OMB and federal agencies identified approximately 413 IT projects ($25.2 billion) as being poorly planned, poorly performing, or both. Agencies struggle to implement sound…

  4. Using Project Performance to Measure Effectiveness of Quality Management System Maintenance and Practices in Construction Industry

    Science.gov (United States)

    Leong, Tiong Kung; Ariff, Mohd. Shoki Md.

    2014-01-01

    This paper proposed seven existing and new performance indicators to measure the effectiveness of quality management system (QMS) maintenance and practices in construction industry. This research is carried out with a questionnaire based on QMS variables which are extracted from literature review and project performance indicators which are established from project management's theory. Data collected was analyzed using correlation and regression analysis. The findings indicate that client satisfaction and time variance have positive and significant relationship with QMS while other project performance indicators do not show significant results. Further studies can use the same project performance indicators to study the effectiveness of QMS in different sampling area to improve the generalizability of the findings. PMID:24701182

  5. Using Project Performance to Measure Effectiveness of Quality Management System Maintenance and Practices in Construction Industry

    Directory of Open Access Journals (Sweden)

    Tiong Kung Leong

    2014-01-01

    Full Text Available This paper proposed seven existing and new performance indicators to measure the effectiveness of quality management system (QMS maintenance and practices in construction industry. This research is carried out with a questionnaire based on QMS variables which are extracted from literature review and project performance indicators which are established from project management's theory. Data collected was analyzed using correlation and regression analysis. The findings indicate that client satisfaction and time variance have positive and significant relationship with QMS while other project performance indicators do not show significant results. Further studies can use the same project performance indicators to study the effectiveness of QMS in different sampling area to improve the generalizability of the findings.

  6. Using project performance to measure effectiveness of quality management system maintenance and practices in construction industry.

    Science.gov (United States)

    Leong, Tiong Kung; Zakuan, Norhayati; Mat Saman, Muhamad Zameri; Ariff, Mohd Shoki Md; Tan, Choy Soon

    2014-01-01

    This paper proposed seven existing and new performance indicators to measure the effectiveness of quality management system (QMS) maintenance and practices in construction industry. This research is carried out with a questionnaire based on QMS variables which are extracted from literature review and project performance indicators which are established from project management's theory. Data collected was analyzed using correlation and regression analysis. The findings indicate that client satisfaction and time variance have positive and significant relationship with QMS while other project performance indicators do not show significant results. Further studies can use the same project performance indicators to study the effectiveness of QMS in different sampling area to improve the generalizability of the findings.

  7. Project Risk Management

    Science.gov (United States)

    Jr., R. F. Miles

    1995-01-01

    Project risk management is primarily concerned with performance, reliability, cost, and schedule. Environmental risk management is primarily concerned with human health and ecological hazards and likelihoods. This paper discusses project risk management and compares it to environmental risk management, both with respect to goals and implementation. The approach of the Jet Propulsion Laboratory to risk management is presented as an example of a project risk management approach that is an extension to NASA NHB 7120.5: Management of Major System Programs and Projects.

  8. Final report of the project performance assessment and economic evaluation of nuclear waste management

    International Nuclear Information System (INIS)

    Rasilainen, K.; Anttila, M.; Hautojaervi, A.

    1993-05-01

    The publication is the final report of project Performance Assessment and Economic Evaluation of Nuclear Waste Management (TOKA) at the Nuclear Engineering Laboratory of VTT (Technical Research Centre of Finland), forming part of the Publicly Financed Nuclear Waste Management Research Programme (JYT). The project covers safety and cost aspects of all phases of nuclear waste management. The main emphasis has been on developing an integrated system of models for performance assessment of nuclear waste repositories. During the four years the project has so far been in progress, the total amount of work has been around 14 person-years. Computer codes are the main tools in the project, they are either developed by the project team or acquired from abroad. In-house model development has been especially active in groundwater flow, near-field and migration modelling. The quantitative interpretation of Finnish tracer experiments in the laboratory and natural analogue studies at Palmottu support performance assessments via increased confidence in the migration concepts used. The performance assessment philosophy adopted by the team consists of deterministic modelling and pragmatic scenario analysis. This is supported by the long-term experience in practical performance assessment of the team, and in theoretical probabilistic modelling exercises. The radiological risks of spent fuel transportation from the Loviisa nuclear power plant to Russia have been analysed using a probabilistic computer code and Finnish traffic accident statistics. The project assists the authorities in the annual assessment of utility estimates of funding needs for future nuclear waste management operations. The models and methods used within the project are tested in international verification/validation projects

  9. Principles of project management

    Science.gov (United States)

    1982-01-01

    The basic principles of project management as practiced by NASA management personnel are presented. These principles are given as ground rules and guidelines to be used in the performance of research, development, construction or operational assignments.

  10. A Management Maturity Model (MMM for project-based organisational performance assessment

    Directory of Open Access Journals (Sweden)

    Craig Langston

    2016-12-01

    Full Text Available Common sense suggests that organisations are more likely to deliver successful projects if they have systems in place that reflect a mature project environment based on a culture of continuous improvement. This paper develops and discusses a Management Maturity Model (MMM to assess the maturity of project management organisations through a customisable, systematic, strategic and practical methodology inspired from the seminal work of Darwin, Deming, Drucker and Daniel. The model presented is relevant to organisations, such as construction and engineering companies, that prefer to use the Project Management Body of Knowledge (PMBOK™ Guide published by the Project Management Institute (PMI, but without the disadvantages of excessive time and cost commitments and a ‘one size fits all’ approach linked to rigid increments of maturity. It offers a game-changing advance in the application of project-based organisational performance assessment compared to existing market solutions that are unnecessarily complex. The feasibility of MMM is field-tested using a medium-sized data centre infrastructure firm in Tehran.

  11. MANAGING MULTICULTURAL PROJECT TEAMS

    Directory of Open Access Journals (Sweden)

    Cezar SCARLAT

    2014-06-01

    Full Text Available The article is based on literature review and authors’ own recent experience in managing multicultural project teams, in international environment. This comparative study considers two groups of projects: technical assistance (TA projects versus information technology (IT projects. The aim is to explore the size and structure of the project teams – according to the team formation and its lifecycle, and to identify some distinctive attributes of the project teams – both similarities and differences between the above mentioned types of projects. Distinct focus of the research is on the multiculturalism of the project teams: how the cultural background of the team members influences the team performance and team management. Besides the results of the study are the managerial implications: how the team managers could soften the cultural clash, and avoid inter-cultural misunderstandings and even conflicts – in order to get a better performance. Some practical examples are provided as well.

  12. Documenting cost and performance for environmental remediation projects: Department of Energy Office of Environmental Management

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-08-08

    The purpose of this DOE guide is to facilitate the use of consistent procedures to document cost and performance information for projects involving the remediation of media contaminated with hazardous and radioactive wastes. It provides remedial action project managers with a standardized set of data to document completed remediation projects. Standardized reporting of data will broaden the utility of the information, increase confidence in the effectiveness of future remedial technologies, and enhance the organization, storage and retrieval of relevant information for future cleanup projects. The foundation for this guide was laid down by the Federal Remediation Technologies Roundtable (FRTR) in their publication, Guide to Documenting Cost and Performance for Remediation Projects, EPA-542-B- 95-002. Member agencies of the FRTR include the US EPA, the US DOD, the US DOE, and the US DOI. All the member agencies are involved in site remediation projects and anticipate following the guidance provided in the above reference. Therefore, there is much to be gained for DOE to be consistent with the other member agencies as it will be easier to compare projects across different agencies and also to learn from the experiences of a wider spectrum of prior completed projects.

  13. A project management framework for enhanced productivity performance using building information modelling

    Directory of Open Access Journals (Sweden)

    Longhui Liao

    2017-09-01

    Full Text Available Although the Singapore government has mandated submissions of building plans in building information modelling (BIM format since July 2013, this does not yet seem to lead to enhanced productivity performance. BIM collaboration between designers and downstream contractors appears to remain inadequate. While many studies have been conducted on using BIM for better project outcomes, studies that relate BIM with the identification of non-value adding activities in the project lifecycle and the reduction of the resulting wastes are at infancy stage. This paper aims to propose a project management framework for enhancing the productivity of building projects in Singapore, which forms Phase I of an ongoing research project. A two-pronged approach is presented. Firstly, non-value adding activities in the current project delivery process that uses BIM partially in Singapore are identified by comparing the typical current process with full BIM-based processes; such activities are cut down after process transformation in terms of people, process, and technology. Secondly, time savings derived from reducing the wastes caused by these activities are quantified. The proposed framework was validated by a case study of a local residential project. It was concluded that this framework provides a valuable tool for project teams to enhance productivity performance.

  14. ORGANIZATIONAL PROJECT MANAGEMENT MATURITY

    Directory of Open Access Journals (Sweden)

    Yana Derenskaya

    2017-11-01

    , and documenting best practices and potential difficulties. Practical implications. For the purposes of the present research, the level of organizational project management maturity of the enterprise in question is evaluated according to the three-level model developed by H. Кеrzner. The conclusion is made that project management maturity of this enterprise corresponds to maturity level 2. Besides, the defined maturity level is specified in more detail along the life cycle phases in order to determine more precisely the position of project management activity of the enterprise within the maturity model. Potential problems (the so-called “bottlenecks” of the enterprise in the field of project management are identified. Based on the results of the analysis, a number of recommendations are suggested for further development of the corporate system of project management at the given enterprise. The results of the research showed that in order to achieve a higher level of maturity, it is necessary to create a project team, organize a project office, and distribute project management functions among the team members, develop a procedure of involving experts with different professional backgrounds into the project implementation, improve the procedure of creating project teams, ensure the accumulation of best practices of project implementation, establish the corporate standard of project management, and improve the strategic planning for project management, project implementation control, managing changes, labour resources and communication. The suggested guidelines are expected to facilitate the achievement of a higher level of maturity. They also envisage the terms of this transition and the responsible executives. Further enhancement of maturity level is achieved by means of performing a set of activities for improving and aligning various project management sub-processes aimed at managing costs, time, quality, and risks. Another important condition of enhancing

  15. Sustainability, creativity and innovation in project management – Model development for assessing organizational performance through projects

    OpenAIRE

    Szabó, Lajos

    2016-01-01

    Today a number of studies are published on how organizational strategy is developed and how organizations contribute to local and regional development through the realization of these strategies. There are also many articles dealing with the success of a project by identifying the criteria and the factors that influence them. This article introduces the project-oriented strategic planning process that reveals how projects contribute to local and regional development and demonstrates the relat...

  16. Performance evaluation of project management system based on combination of EFQM and QFD

    Directory of Open Access Journals (Sweden)

    Amin Ahmadi Digehsara

    2018-09-01

    Full Text Available Project management system (PMS is broadly recognized as the effective management tool for several organizations. European Foundation of Quality Management (EFQM model provides some advantages for companies to be successful in current competitive environment. This paper is based on the combination of EFQM and Quality function deployment (QFD in order to eval-uate a PMS in an aviation organization. Although, an integration of these models increases the system complexity, the implementation of EFQM-QFD helps us identify all noteworthy success factors of PMS within the organization. In addition, the current status of PMS performance is evaluated based on these factors. This study attempts to find out how organizations ought to be managed to take full advantage of PMS tools. This study uses a comprehensive questionnaire to find all critical factors influencing on the success of the organization. The method of this paper is implemented in an organization in aviation industry with several management departments.

  17. Success Lies in the Eye of the Beholder: The Mismatch Between Perceived and Real IT Project Management Performance

    NARCIS (Netherlands)

    Neves, F.G.; Borgman, H.; Heier, H.; Bui, T.X.; Sprague, R.H.

    2016-01-01

    This study explores the divergence between traditional IT project management performance criteria such as adherence to functionality, schedule and cost, and perceived project management performance. Based on a literature survey, five propositions are derived and subsequently used to guide in-depth

  18. Managing Projects with KPRO

    Science.gov (United States)

    Braden, Barry M.

    2004-01-01

    How does a Project Management Office provide: Consistent, familiar, easily used scheduling tools to Project Managers and project team members? Provide a complete list of organization resources available for use on the project? Facilitate resource tracking and visibility? Provide the myriad reports that the organization requires? Facilitate consistent budget planning and cost performance information? Provide all of this to the entire organization? Provide for the unique requirement of the organization? and get people to use it? Answer: Implementation of the Kennedy space Center Projects and Resources Online (KPRO), a modified COTS solution.

  19. Squaring the Project Management Circle: Updating the Cost, Schedule, and Performance Methodology

    Science.gov (United States)

    2016-04-30

    MIT Sloan Management Review . MIT Sloan Management Review . Retrieved from http://sloanreview.mit.edu/article/the-new-industrial-engineering-information-technology-and- business-process-redesign/ ...critical variable that must be addressed by project managers . The research methodology consists of a system-focused approach based on an extensive review ...doi.org/10.1016/j.ijproman.2007.01.004 Baccarini, D. (1996). The concept of project complexity–A review .

  20. From volatility to value: analysing and managing financial and performance risk in energy savings projects

    International Nuclear Information System (INIS)

    Mills, Evan; Kromer, Steve; Weiss, Gary; Mathew, Paul A.

    2006-01-01

    Many energy-related investments are made without a clear financial understanding of their values, risks, and volatilities. In the face of this uncertainty, the investor-such as a building owner or an energy service company-will often choose to implement only the most certain and thus limited energy-efficiency measures. Conversely, commodities traders and other sophisticated investors accustomed to evaluating investments on a value, risk, and volatility basis often overlook energy-efficiency investments because risk and volatility information are not provided. Fortunately, energy-efficiency investments easily lend themselves to such analysis using tools similar to those applied to supply side risk management. Accurate and robust analysis demands a high level of understanding of the physical aspects of energy-efficiency, which enables the translation of physical performance data into the language of investment. With a risk management analysis framework in place, the two groups-energy-efficiency experts and investment decision-makers-can exchange the information they need to expand investment in demand-side energy projects. In this article, we first present the case for financial risk analysis in energy efficiency in the buildings sector. We then describe techniques and examples of how to identify, quantify, and manage risk. Finally, we describe emerging market-based opportunities in risk management for energy efficiency

  1. Methodologies of Project Management

    Directory of Open Access Journals (Sweden)

    Wojciech Macek

    2011-07-01

    Full Text Available This paper presents comparison of three most popular project management standardsbelonging to a wider group of models (for example, PMBOK, Prince 2, CMMI, ISO 10006,BS 6079, IPMA Competence Baseline, European Commission Project Cycle ManagementGuidelines. The author discusses methods of project management according to PMBoK,Prince 2 and ISO 10006, some chosen criteria and fields of knowledge, such as generalregulations of standards, project range management, resources management, and processesconnected with risk, systems of project quality management.

  2. Using Agile Project Management to Enhance the Performance of Instructional Design Teams

    Science.gov (United States)

    Sweeney, David S.; Cifuentes, Lauren

    2010-01-01

    Instructional design models describe in detail methodologies for designing effective instruction. Several widely adopted models include suggestions for managing instructional design projects. However, these suggestions focus on how to manage the instructional design steps rather than the instructional design and development team process. The…

  3. Managing Projects for Change: Contextualised Project Management

    Science.gov (United States)

    Tynan, Belinda; Adlington, Rachael; Stewart, Cherry; Vale, Deborah; Sims, Rod; Shanahan, Peter

    2010-01-01

    This paper will detail three projects which focussed on enhancing online learning at a large Australian distance education University within a School of Business, School of Health and School of Education. Each project had special funding and took quite distinctive project management approaches, which reflect the desire to embed innovation and…

  4. Project Communications Management

    OpenAIRE

    José C. Santiago-Guevara; Mauricio Rojas-Contreras; Luis A. Esteban-Villamizar

    2013-01-01

    This article presents a review in relation to the object of study: Communications Management as an important factor in the management of projects. The review includes the most relevant and most renowned authors in the field of project management, focusing on telecommunications projects, which lets you define a communications management model.

  5. Managing clinical improvement projects.

    Science.gov (United States)

    Phillips, Joanna; Simmonds, Lorraine

    This paper, the second of a three-part series looking at change management tools, provides a practical guide on how to use common project management principles in practice. Much of the literature on project management focuses on the business arena, with little reference to clinical settings. Identifying this literature and understanding its relevance to managing projects in healthcare can be difficult. This article provides a practical guide to identifying the key principles of good project management and applying these in health settings.

  6. Modern project-management

    CERN Multimedia

    CERN. Geneva

    2003-01-01

    This lecture will focus on the following issues: - The current state of the art in Project Management, especially the integration of Project Management with general management activities, and the integrated view of resources allocation. - Overview of the project life cycle, the phases and the deliverables - Necessity and limits of planning in a research environment - Organizational aspects of the projects the roles of the stakeholders - How to get the resources when they are needed - Risk Management in Projects - Earned value - How to keep a project on track (schedule and budget) - Management of the suppliers - Closing of the project

  7. Project management process.

    Science.gov (United States)

    2007-03-01

    This course provides INDOT staff with foundational knowledge and skills in project management principles and methodologies. INDOTs project management processes provide the tools for interdisciplinary teams to efficiently and effectively deliver pr...

  8. Project management case studies

    CERN Document Server

    Kerzner, Harold R

    2013-01-01

    A new edition of the most popular book of project management case studies, expanded to include more than 100 cases plus a ""super case"" on the Iridium Project Case studies are an important part of project management education and training. This Fourth Edition of Harold Kerzner''s Project Management Case Studies features a number of new cases covering value measurement in project management. Also included is the well-received ""super case,"" which covers all aspects of project management and may be used as a capstone for a course. This new edition:Contains 100-plus case studies drawn from re

  9. Risk Management Capability Maturity and Performance of Complex Product and System (CoPS Projects with an Asian Perspective

    Directory of Open Access Journals (Sweden)

    Ren, Y.

    2014-07-01

    Full Text Available Complex Products and Systems (CoPS are high value, technology and engineering-intensive capital goods. The motivation of this study is the persistent high failure rate of CoPS projects, Asian CoPS provider’s weak capability and lack of specific research on CoPS risk management. This paper evaluates risk management maturity level of CoPS projects against a general CoPS risk management capability maturity model (RM-CMM developed by the authors. An Asian based survey was conducted to investigate the value of RM to project performance, and Asian (non-Japanese CoPS implementers’ perceived application of RM practices, their strengths and weaknesses. The survey result shows that higher RM maturity level leads to higher CoPS project performance. It also shows project complexity and uncertainty moderates the relationship between some RM practices and project performance, which implies that a contingency approach should be adopted to manage CoPS risks effectively. In addition, it shows that Asian CoPS implementers are weak in RM process and there are also rooms for improvement in the softer aspects of organizational capabilities and robustness.

  10. The influence of organisational and management factors on safety performance in NNPPS. Rand D project

    International Nuclear Information System (INIS)

    Cal, C. de la; Gil, B.; Sola, R.; Vaquero, C.; Garces, M. I.

    2002-01-01

    The direct influence of organisational and managerial factors on safety performance in nuclear power plants has been widely proved by two findings, the analysis of their operating experience and the differences in safety levels reached by similar installations. Specially, the study of majors accidents such as TMI-2 and Chernobyl have demonstrated that the technical deficiencies are not the only root causes, but there are a whole set of human, organisational, managerial and social factors which are the origin from most of these deficiencies. In recent years, this fact is emphasised with the nuclear industry involved a process of change. The deregulation of the electricity market, which has increased the economic pressures to the companies and has driven in many cases to restructures in ownership (mergers, acquisitions), downsizing processes and outsourcing parts of the work, jointly with the development of information technologies and computer networks and with a change in the regulatory and social climates are some of the nre factors affecting the performance of nuclear power plants that have addressed, even more, to the need of re-viewing and assessing the impact of organisational aspects on their safe performance. There have been international efforts to analyse the influence of organisational factors in the safety of nuclear power plants following different approaches. Research institutions, utilities and regulatory bodies. individually or in co-operation, have tried to develop practical tools for taking into account the organisation. According to these international efforts the Association of Spanish Utilities, UNESA, and the Spanish Nuclear Regulatory Body, CSN, have included in 1998, for the first time in their Co-ordinated Plan for Research, an innovative five years R and D project entitled Development of methods to evaluate and model the impact of organisation on nuclear poer plants safety whose main objectives are to analyse the impact of organisation and

  11. Designing Project Management

    NARCIS (Netherlands)

    Heintz, John Linke; Lousberg, L.; Wamelink, J.W.F.; Saari, A.; Huovinen, P.

    2016-01-01

    In this paper we introduce the concept of Designing Project Management. On the basis of our earlier work, we suggest that there is still a gap between what is known from recent project management literature and what project managers can structurally help in the effectiveness of their work. Assuming

  12. MRS project management

    International Nuclear Information System (INIS)

    Doman, J.W.; Vlahakis, J.

    1992-01-01

    Management of projects under the control of the Office of Civilian Radioactive Waste Management within the Department of Energy is subject to overview by a variety of internal and external entities. This paper reports that effective project management often requires balancing of conflicting directions and conflicting agendas of the different entities in order to proceed with implementation of the Monitored Retrievable Storage project

  13. Web Project Management

    OpenAIRE

    Suralkar, Sunita; Joshi, Nilambari; Meshram, B B

    2013-01-01

    This paper describes about the need for Web project management, fundamentals of project management for web projects: what it is, why projects go wrong, and what's different about web projects. We also discuss Cost Estimation Techniques based on Size Metrics. Though Web project development is similar to traditional software development applications, the special characteristics of Web Application development requires adaption of many software engineering approaches or even development of comple...

  14. PROJECT SCOPE MANAGEMENT PROCESS

    Directory of Open Access Journals (Sweden)

    Yana Derenskaya

    2018-01-01

    Full Text Available The purpose of the article is to define the essence of project scope management process, its components, as well as to develop an algorithm of project scope management in terms of pharmaceutical production. Methodology. To carry out the study, available information sources on standards of project management in whole and elements of project scope management in particular are analysed. Methods of system and structural analysis, logical generalization are used to study the totality of subprocesses of project scope management, input and output documents, and to provide each of them. Methods of network planning are used to construct a precedence diagram of project scope management process. Results of the research showed that components of the project scope management are managing the scope of the project product and managing the content of project work. It is the second component is investigated in the presented work as a subject of research. Accordingly, it is defined that project scope management process is to substantiate and bring to the realization the necessary amount of work that ensures the successful implementation of the project (achievement of its goal and objectives of individual project participants. It is also determined that the process of managing the project scope takes into account the planning, definition of the project scope, creation of the structure of project work, confirmation of the scope and management of the project scope. Participants of these subprocesses are: customer, investor, and other project participants – external organizations (contractors of the project; project review committee; project manager and project team. It is revealed that the key element of planning the project scope is the formation of the structure of design work, the justification of the number of works, and the sequence of their implementation. It is recommended to use the following sequence of stages for creating the structure of project work

  15. Project stakeholder management

    CERN Document Server

    Eskerod, Pernille

    2013-01-01

    Carrying out a project as planned is not a guarantee for success. Projects may fail because project management does not take the requirements, wishes and concerns of stakeholders sufficiently into account. Projects can only be successful though contributions from stakeholders. And in the end, it is the stakeholders that evaluate whether they find that the project is a success. To manage stakeholders effectively, you need to know your stakeholders, their behaviours and attitudes towards the project. In Project Stakeholder Management, the authors give guidance on how to adopt an analytical and s

  16. The Environmental Management Project Manager's Handbook for improved project definition

    International Nuclear Information System (INIS)

    1995-02-01

    The United States Department of Energy (DOE) is committed to providing high quality products that satisfy customer needs and are the associated with this goal, DOE personnel must possess the knowledge, skills, and abilities to ensure successful job performance. In addition, there must be recognition that the greatest obstacle to proper project performance is inadequate project definition. Without strong project definition, DOE environmental management efforts are vulnerable to fragmented solutions, duplication of effort, and wastes resources. The primary means of ensuring environmental management projects meet cost and schedule milestones is through a structured and graded approach to project definition, which is the focus of this handbook

  17. IT Project Management Metrics

    Directory of Open Access Journals (Sweden)

    2007-01-01

    Full Text Available Many software and IT projects fail in completing theirs objectives because different causes of which the management of the projects has a high weight. In order to have successfully projects, lessons learned have to be used, historical data to be collected and metrics and indicators have to be computed and used to compare them with past projects and avoid failure to happen. This paper presents some metrics that can be used for the IT project management.

  18. Successful project management

    CERN Document Server

    Young, Trevor L

    2016-01-01

    Successful Project Management, 5th edition, is an essential guide for anyone who wants to improve the success rate of their projects. It will help managers to maintain a balance between the demands of the customer, the project, the team and the organization. Covering the more technical aspects of a project from start to completion it contains practised and tested techniques, covering project conception and start-up, how to manage stake holders, effective risk management, project planning and launch and execution. Also including a brand new glossary of key terms, it provides help with evaluating your project as well as practical checklists and templates to ensure success for any ambitious project manager. With over one million copies sold, the hugely popular Creating Success series covers a wide variety of topic, with the latest editions including new chapters such as Tough Conversations and Treating People Right. This indispensable business skills collection is suited to a variety of roles, from someone look...

  19. Earned value project management

    CERN Document Server

    Fleming, Quentin W

    2010-01-01

    Organizations that follow the principles of good Earned Value Management (EVM) create an environment that allows teams to successfully operate and thrive ? even in the face of challenges that could negatively impact their projects. Earned Value Project Management (EVPM) is a methodology used to measure and communicate the real physical progress of a project taking into account the work completed, the time taken and the costs incurred to complete that work. As a result, EVPM allows more educated and effective management decision-making, which helps evaluate and control project risk by measuring project progress in monetary terms. In the first two editions of Earned Value Project Management, Quentin W. Fleming and Joel M. Koppelman provided guidance for project management practitioners already familiar with EVPM, was well as those who were new to the use of this technique. The third edition expanded the information available on of EVPM for medium and smaller projects while still being relevant for larger projec...

  20. Fundamentals of Project Management

    CERN Document Server

    Heagney, Joseph

    2011-01-01

    With sales of more than 160,000 copies, Fundamentals of Project Management has helped generations of project managers navigate the ins and outs of every aspect of this complex discipline. Using a simple step-by-step approach, the book is the perfect introduction to project management tools, techniques, and concepts. Readers will learn how to: ò Develop a mission statement, vision, goals, and objectives ò Plan the project ò Create the work breakdown structure ò Produce a workable schedule ò Understand earned value analysis ò Manage a project team ò Control and evaluate progress at every stage.

  1. Efficient and Effective Project Management

    Directory of Open Access Journals (Sweden)

    Dusan Pene

    2014-03-01

    Full Text Available The purpose of the article is to investigate different authorities and responsibilities of a project manager and of a project leader. Considering the fact that nowadays the project management is becoming the important factor in performing and leading the investments which are modified by modern leadership theories, we can say that the key element is the sovereign leadership of a manager and a project leader. The current multi-project environments and modern techniques at the project management area need the interdisciplinary leadership approach and at the same time they enable the strengthening of company’s competitive features so they are consistently satisfying high project expectations of the project investor or a client.

  2. PROJECT HANFORD MANAGEMENT CONTRACT (PHMC) PERFORMANCE REPORT 05/2004 (WWW.HANFORD.GOV/EMPR.INDEX.CFM)

    International Nuclear Information System (INIS)

    PIELSTICK, R.M.

    2004-01-01

    This report is the monthly performance summary of the Central Plateau Contractors. FH work scope responsibilities are described, and other contractor/RL-managed work is excluded. Section A, Overview, provides a summary of the cost, schedule, and technical performance described in this report. It summarizes performance for the period covered, highlights areas worthy of management attention, and provides key performance activities as extracted from the contractor baseline. Subsequent sections of this report provide detailed performance data relative to contract sections (e.g., Project Hanford Cleanup Work Summary, Waste and Spent Nuclear Fuel Management Operations, Infrastructure and Hanford Site Services, and other Work Scope). All information is as of the end of May 2004 unless otherwise noted

  3. Spent Nuclear Fuel project, project management plan

    International Nuclear Information System (INIS)

    Fuquay, B.J.

    1995-01-01

    The Hanford Spent Nuclear Fuel Project has been established to safely store spent nuclear fuel at the Hanford Site. This Project Management Plan sets forth the management basis for the Spent Nuclear Fuel Project. The plan applies to all fabrication and construction projects, operation of the Spent Nuclear Fuel Project facilities, and necessary engineering and management functions within the scope of the project

  4. Managing Distributed Software Projects

    DEFF Research Database (Denmark)

    Persson, John Stouby

    Increasingly, software projects are becoming geographically distributed, with limited face-toface interaction between participants. These projects face particular challenges that need careful managerial attention. This PhD study reports on how we can understand and support the management...... of distributed software projects, based on a literature study and a case study. The main emphasis of the literature study was on how to support the management of distributed software projects, but also contributed to an understanding of these projects. The main emphasis of the case study was on how to understand...... the management of distributed software projects, but also contributed to supporting the management of these projects. The literature study integrates what we know about risks and risk-resolution techniques, into a framework for managing risks in distributed contexts. This framework was developed iteratively...

  5. Construction project management handbook.

    Science.gov (United States)

    2012-03-01

    The purpose of the FTA Construction Project Management Handbook is to provide guidelines for use by public transit agencies (Agen-cies) undertaking substantial construction projects, either for the first time or with little prior experience with cons...

  6. Project management for engineers

    CERN Document Server

    Bennett, Michael J

    2014-01-01

    Project Management for Engineers, as the title suggests, is a direct attempt at addressing the ever-increasing and specific needs for better project management of engineering students, practicing engineers and managers in the industry. It aims not only to present the principles and techniques of Project Management, but also to discuss project management standards, processes and requirements, such as PMBOK, IEEE and PRINCE. Each chapter begins with the basics of the theme being developed at a level understandable to an undergraduate, before more complex topics are introduced at the end of each section that are suitable for graduate students. For the practicing professionals or managers in the industry, the book also provides many real illustrations of practical application of the principles of Project Management. Through a realistic blend of theory and practical examples, as well as an integration of the engineering technical issues with business issues, this book seeks to remove the veil of mystery that has...

  7. Project Management Techniques

    OpenAIRE

    Mihalache Anita; Salagean Liana

    2010-01-01

    Project management is a technique that can aid in the planning, scheduling, and monitoring of complex projects characterized by numerous, non repetitive jobs called activities. Examples of projects that would use project management include: - developing a mass rapid – transit system for a metropolitan area; - organizing the relocation of a corporate headquarters; - planning the production of a concert, film, or play; - developing and marketing a new automobile; - constructing a high – rise of...

  8. Risks management in project planning

    OpenAIRE

    Stankevičiūtė, Roberta

    2017-01-01

    Project management consists of two very important aspects – managing the right project and managing the project right. To know that you are managing the right project you need to ensure that your project is based on an actual requirement and that your project goal is relevant and beneficial. And professional project planning assists in managing project the right way. The project planning process is very time consuming and is one of the most important parts of the project management process. T...

  9. Return on Scientific Investment - RoSI: a PMO dynamical index proposal for scientific projects performance evaluation and management.

    Science.gov (United States)

    Caous, Cristofer André; Machado, Birajara; Hors, Cora; Zeh, Andrea Kaufmann; Dias, Cleber Gustavo; Amaro Junior, Edson

    2012-01-01

    To propose a measure (index) of expected risks to evaluate and follow up the performance analysis of research projects involving financial and adequate structure parameters for its development. A ranking of acceptable results regarding research projects with complex variables was used as an index to gauge a project performance. In order to implement this method the ulcer index as the basic model to accommodate the following variables was applied: costs, high impact publication, fund raising, and patent registry. The proposed structured analysis, named here as RoSI (Return on Scientific Investment) comprises a pipeline of analysis to characterize the risk based on a modeling tool that comprises multiple variables interacting in semi-quantitatively environments. This method was tested with data from three different projects in our Institution (projects A, B and C). Different curves reflected the ulcer indexes identifying the project that may have a minor risk (project C) related to development and expected results according to initial or full investment. The results showed that this model contributes significantly to the analysis of risk and planning as well as to the definition of necessary investments that consider contingency actions with benefits to the different stakeholders: the investor or donor, the project manager and the researchers.

  10. DEPLOYMENT OF GOALS AND PROJECT PERFORMANCE MANAGEMENT CASE STUDY IN THE ENGINEERING DEPARTMENT OF PETROBRAS

    Directory of Open Access Journals (Sweden)

    Antonio Carlos de Lemos Oliveira

    2011-05-01

    Full Text Available The dynamic technology innovations and the constant changes in the world geopolitical scenarios have been creating turbulences in the majority of the environments in which the petroleum industry organizations are situated. Therefore, it is vital for the development and survival of these organizations that they establish a management and planning process capable of offering flexible answers to all challenges that arise in this business. Inside this context, this paper intends to investigate the ongoing techniques used for the deployment of goals and performance management of the employees who work for the engineering department of Petrobras, comparing the behavior of four organization structures named UIE - Unidade de Implementação de Empreendimento, considering some of their scores and the results of the existing individual management body of each of these structures. The main research instruments used in this case study were the documental analyses and semi-structured interviews with the main authors of the formulation and implementation process for the planning and management of the company, beyond the direct observation of these process. The paper accomplishes its goals and brings results and proposals that perceive a continuous development of the Performance Management system in the engineering department of Petrobras.

  11. Integrated Project Management System description

    International Nuclear Information System (INIS)

    1987-03-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project is a Department of Energy (DOE) designated Major System Acquisition (MSA). To execute and manage the Project mission successfully and to comply with the MSA requirements, the UMTRA Project Office (''Project Office'') has implemented and operates an Integrated Project Management System (IPMS). The Project Office is assisted by the Technical Assistance Contractor's (TAC) Project Integration and Control (PIC) Group in system operation. Each participant, in turn, provides critical input to system operation and reporting requirements. The IPMS provides a uniform structured approach for integrating the work of Project participants. It serves as a tool for planning and control, workload management, performance measurement, and specialized reporting within a standardized format. This system description presents the guidance for its operation. Appendices 1 and 2 contain definitions of commonly used terms and abbreviations and acronyms, respectively. 17 figs., 5 tabs

  12. Human and organisational factors as key levers of performance in D and D project management - 59323

    International Nuclear Information System (INIS)

    Flament, Thierry; Willmann, Bertrand; Laval, Gregoire de; Lemarch, Jean-Louis; Cordoba, Alain

    2012-01-01

    Document available in abstract form only. Full text of publication follows: In a number pf D and D projects, the type of installations to be dismantled and the variety of their equipments (glove-boxes, tanks..) and the products present on site (plutonium, uranium) in the form of powder are making many operations manual ones. Key phases in HR and organisation management: - The first D and D experience, the learning curve ramp-up - To begin any project, you usually try to benefit from benchmark of similar projects to be able to build up the first scenario, by using the best practices. The first experimental team consisted of operators who already had experienced dismantling at least once in the course of their career. This first dismantling operation is preferably to be conducted on an installation relatively poorly contaminated. This was to implement the correct techniques thus reducing the consequences of a possible unforeseen event. The capitalisation on the return on experience The success of this first dismantling site operation allowed us to implement a process of experience feedback to build the scenarios and the operating procedures of the following sites. In particular, targeted safety-security stop points are positioned for validation on the operations by people responsible for safety and security

  13. Managing Stress. Project Seed.

    Science.gov (United States)

    Muto, Donna; Wilk, Jan

    One of eight papers from Project Seed, this paper describes a stress management project undertaken with high school sophomores. Managing Stress is described as an interactive workshop that offers young people an opportunity to examine specific areas of stress in their lives and to learn effective ways to deal with them. The program described…

  14. MANAGING LARGE INVESTMENT PROJECTS IN GORJ

    Directory of Open Access Journals (Sweden)

    CÎRNU DORU

    2016-12-01

    Full Text Available Currently, the concept of project management is considered to be the best concept for efficient management of a project, so it is used all over the world, and most recently in our country. This concept is designed with all the general characteristics of project management, but adapted to the large investment projects. This paper presents the project management concept and project management organization for capital projects. This concept is conceived with all general characteristics of project management, but adopted to the condition of large investment projects. The concept also includes the project team and the project manager, the person authorized and responsible for achieving the objectives planned in the project. For efficient managing by project, it is necessary to insure a good compozition of project team, as a team of people who, in collaboration with project manager, work directly on managing the project. To effectively manage the project, it is necessary to ensure a proper composition of the project team, a team of people who, in collaboration with the project manager to work directly for project management. It is a particularly good method of achieving the objectives planned projects, which means a project with a certain level of performance required in a planned time, with planned costs.

  15. Constrained bayesian inference of project performance models

    OpenAIRE

    Sunmola, Funlade

    2013-01-01

    Project performance models play an important role in the management of project success. When used for monitoring projects, they can offer predictive ability such as indications of possible delivery problems. Approaches for monitoring project performance relies on available project information including restrictions imposed on the project, particularly the constraints of cost, quality, scope and time. We study in this paper a Bayesian inference methodology for project performance modelling in ...

  16. Managing for performance

    International Nuclear Information System (INIS)

    Vandergrift, J.D.

    1985-01-01

    The training manager's role in the nuclear industry has changed considerably during the past five years. Training managers have become managers of complex projects, large staffs and multimillion dollar budgets. Along with the growth have come greater management responsibilities and problems. At Arkansas Nuclear One, a relatively quick and orderly transition to a larger, more professional training organization has occurred over the past four years. A major contribution to the successful transition was the application of fundamental management principles through managing for performance. The purpose of this paper is to share principles that have been utilized at Arkansas Nuclear One

  17. Project Management Plan

    International Nuclear Information System (INIS)

    1988-01-01

    The mission of the Uranium Mill Tailings Remedial Action (UMTRA) Project is explicitly stated and directed in the Uranium Mill Tailings Radiation Control Act of 1978, Public Law 95-604, 42 USC 7901 (hereinafter referred to as the ''Act''). Title I of the Act authorizes the Department of Energy (DOE) to undertake remedial actions at 24 designated inactive uranium processing sites and associated vicinity properties containing uranium mill tailings and other residual radioactive materials derived from the processing sites. The Act, amended in January 1983, by Public Law 97-415, also authorizes DOE to perform remedial actions at vicinity properties in Edgemont, South Dakota. Cleanup of the Edgemont processing site is the responsibility of the Tennessee Valley Authority. This document describes the plan, organization, system, and methodologies used to manage the design, construction, and other activities required to clean up the designated sites and associated vicinity properties in accordance with the Act. The plan describes the objectives of the UMTRA Project, defines participants' roles and responsibilities, outlines the technical approach for accomplishing the objectives, and describes the planning and managerial controls to be used in integrating and performing the Project mission. 21 figs., 21 tabs

  18. Return on Scientific Investment – RoSI: a PMO dynamical index proposal for scientific projects performance evaluation and management

    Directory of Open Access Journals (Sweden)

    Cristofer André Caous

    2012-06-01

    Full Text Available Objective: To propose a measure (index of expected risks to evaluateand follow up the performance analysis of research projects involvingfinancial and adequate structure parameters for its development.Methods: A ranking of acceptable results regarding researchprojects with complex variables was used as an index to gauge aproject performance. In order to implement this method the ulcerindex as the basic model to accommodate the following variableswas applied: costs, high impact publication, fund raising, and patentregistry. The proposed structured analysis, named here as RoSI(Return on Scientific Investment comprises a pipeline of analysis tocharacterize the risk based on a modeling tool that comprises multiplevariables interacting in semi-quantitatively environments. Results:This method was tested with data from three different projects in ourInstitution (projects A, B and C. Different curves reflected the ulcer indexes identifying the project that may have a minor risk (project C related to development and expected results according to initial or full investment. Conclusion: The results showed that this model contributes significantly to the analysis of risk and planning as well as to the definition of necessary investments that consider contingency actions with benefits to the different stakeholders: the investor or donor, the project manager and the researchers.

  19. Project Hanford management contract quality improvement project management plan; TOPICAL

    International Nuclear Information System (INIS)

    ADAMS, D.E.

    1999-01-01

    On July 13, 1998, the U.S. Department of Energy, Richland Operations Office (DOE-RL) Manager transmitted a letter to Fluor Daniel Hanford, Inc. (FDH) describing several DOE-RL identified failed opportunities for FDH to improve the Quality Assurance (QA) Program and its implementation. In addition, DOE-RL identified specific Quality Program performance deficiencies. FDH was requested to establish a periodic reporting mechanism for the corrective action program. In a July 17, 1998 response to DOE-RL, FDH agreed with the DOE concerns and committed to perform a comprehensive review of the Project Hanford Management Contract (PHMC) QA Program during July and August, 1998. As a result, the Project Hanford Management Contract Quality Improvement Plan (QIP) (FDH-3508) was issued on October 21, 1998. The plan identified corrective actions based upon the results of an in-depth Quality Program Assessment. Immediately following the scheduled October 22, 1998, DOE Office of Enforcement and Investigation (EH-10) Enforcement Conference, FDH initiated efforts to effectively implement the QIP corrective actions. A Quality Improvement Project (QI Project) leadership team was assembled to prepare a Project Management Plan for this project. The management plan was specifically designed to engage a core team and the support of representatives from FDH and the major subcontractors (MSCs) to implement the QIP initiatives; identify, correct, and provide feedback as to the root cause for deficiency; and close out the corrective actions. The QI Project will manage and communicate progress of the process

  20. Managing a project's legacy: implications for organizations and project management

    Science.gov (United States)

    Cooper, Lynne P.; Hecht, Michael H.; Majchrzak, Ann

    2003-01-01

    Organizations that rely on projects to implement their products must find effective mechanisms for propagating lessons learned on one project throughout the organization. A broad view of what constitutes a project's 'legacy' is presented that includes not just the design products and leftover parts, but new processes, relationships, technology, skills, planning data, and performance metrics. Based on research evaluating knowledge reuse in innovative contexts, this paper presents an approach to project legacy management that focuses on collecting and using legacy knowledge to promote organizational learning and effective reuse, while addressing factors of post-project responsibility, information obsolescence, and the importance of ancillary contextual information. .

  1. PROJECT APPROACH TO ENERGY MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Інга Борисівна СЕМКО

    2016-02-01

    Full Text Available Project management is widely used around the world as a tool to improve business performance. Correct implementation of the program of implementation of energy efficiency is accompanied by the adoption of an appropriate legislative framework, support programs, the approval of market-based instruments. Currently, it is paying enough attention to the effective application of market-based instruments, although most of the activities in the field of energy efficiency from the economic side are quite profitable. The authors suggested the use of the methodology of project management to the management of energy-saving measures, new approaches to the place and role of project management in the hierarchy of guidance. As a result, this innovation can improve the competitiveness of enterprises. The conclusions that the energy-saving project management allows you to get the best results for their implementation by reducing the time, resources, risk reduction.

  2. Project Management and the Project Manager: A Strategy for ...

    African Journals Online (AJOL)

    International Journal of Development and Management Review ... collapse, project failure, project abandonment, project cost and time overruns, etc. ... component parts that constitute project management in the building construction industry.

  3. BODIES OF KNOWLEDGE IN PROJECT MANAGEMENT AND PROJECT QUALITY MANAGEMENT

    OpenAIRE

    Tamara Gvozdenovic; Mirjana Miljanovic; Aleksandar Jegdic; Zeljko Crnogorcic

    2008-01-01

    One of the main trends is standardization of project management. Some of the most important bodies of knowledge in project management, which were created by professional associations for project management are given in this paper. The main of the project management, apart from minimization of time, resources and costs, is to finish the project in the required quality, i.e. it is very important during the whole process of project management to provide realizing the project without any deviatio...

  4. Organization of project management

    International Nuclear Information System (INIS)

    Schmidt, R.

    1975-01-01

    When speaking about interfaces within a project and their management, one has to understand and define what an interface is. In general, each component facing another one and each person working on a project with another person represents an interface. Therefore a project will consist practically in its entirety of interfaces with components and people sandwiched between them. This paper is limited to the most important interfaces with a focus on the problems occuring at them and their resolution. (orig.) [de

  5. Management of Software Development Projects

    Directory of Open Access Journals (Sweden)

    Felician ALECU

    2011-04-01

    Full Text Available Any major software development starts with the Initiating process group. Once the charter document is approved, the Planning and then to the Executing stages will follow. Monitoring and Controlling is measuring the potential performance deviation of the project in terms of schedule and costs and performs the related Integrated Change Control activities. At the end, during the Closing, the program/project manager will check the entire work is completed and the objectives are met.

  6. Ace Project as a Project Management Tool

    Science.gov (United States)

    Cline, Melinda; Guynes, Carl S.; Simard, Karine

    2010-01-01

    The primary challenge of project management is to achieve the project goals and objectives while adhering to project constraints--usually scope, quality, time and budget. The secondary challenge is to optimize the allocation and integration of resources necessary to meet pre-defined objectives. Project management software provides an active…

  7. HERMES project management I

    CERN Multimedia

    CERN. Geneva

    2013-01-01

    A two-hours course on the HERMES Project Management Methodology to the attention of Project Leaders and Project Participants. The methodology is quickly presented; the focus is put on the roles and responsibilities and on the project initiation phase. The course is given in French with slides in English. On April 22nd 2013, a new version of the HERMES methodology was made public. For practical reasons, this course is still given based on the 2009 version of HERMES (a.k.a. HERMES 4).

  8. Scrum Project Management

    CERN Document Server

    Pries, Kim H

    2010-01-01

    Scrum, which was originally invented solely for software development, can now be applied to all types of projects. This book shows project managers how to implement Scrum by explaining the artifacts, rituals, and roles used. The text provides Scrum planning methods to control project scope and schedule as well as Scrum tracking methods to focus teams on improving throughput and streamlining communications. The authors show how to combine traditional project methods with Scrum and how to adapt the familiar work breakdown structure to create Scrum backlogs and sprints. They also demonstrate how

  9. Project management in health informatics.

    Science.gov (United States)

    Ho, Jessica

    2010-01-01

    This chapter gives an educational overview of: * the concept of project management and its role in modern management * the generic project lifecycle process * processes used in developing a plan for the management of resources - time, cost, physical resources and people * the concept of managing risk in projects * communication processes and practices that are important to the management of projects.

  10. Finance and supply management project execution plan

    Energy Technology Data Exchange (ETDEWEB)

    BENNION, S.I.

    1999-02-10

    As a subproject of the HANDI 2000 project, the Finance and Supply Management system is intended to serve FDH and Project Hanford major subcontractor with financial processes including general ledger, project costing, budgeting, and accounts payable, and supply management process including purchasing, inventory and contracts management. Currently these functions are performed with numerous legacy information systems and suboptimized processes.

  11. An adaptive algorithm for performance assessment of construction project management with respect to resilience engineering and job security

    Directory of Open Access Journals (Sweden)

    P. Hashemi

    2018-01-01

    Full Text Available Construction sites are accident-prone locations and therefore safety management plays an im-portant role in these workplaces. This study presents an adaptive algorithm for performance as-sessment of project management with respect to resilience engineering and job security in a large construction site. The required data are collected using questionnaires in a large construction site. The presented algorithm is composed of radial basis function (RBF, artificial neural networks multi-layer perceptron (ANN-MLP, and statistical tests. The results indicate that preparedness, fault-tolerance, and flexibility are the most effective factors on overall efficiency. Moreover, job security and resilience engineering have similar statistical impacts on overall system efficiency. The results are verified and validated by the proposed algorithm.

  12. Agile & Distributed Project Management

    DEFF Research Database (Denmark)

    Pries-Heje, Jan; Pries-Heje, Lene

    2011-01-01

    Scrum has gained surprising momentum as an agile IS project management approach. An obvious question is why Scrum is so useful? To answer that question we carried out a longitudinal study of a distributed project using Scrum. We analyzed the data using coding and categorisation and three carefully...... selected theoretical frameworks. Our conclusion in this paper is that Scrum is so useful because it provides effective communication in the form of boundary objects and boundary spanners, it provides effective social integration by building up social team capital, and it provides much needed control...... and coordination mechanisms by allowing both local and global articulation of work in the project. That is why Scrum is especially useful for distributed IS project management and teamwork....

  13. Implementing clinical process management of vascular wounds in a tertiary facility: impact evaluation of a performance improvement project.

    Science.gov (United States)

    Avruscio, Giampiero; Tocco-Tussardi, Ilaria; Bordignon, Greta; Vindigni, Vincenzo

    2017-01-01

    Chronic vascular wounds have a significant economic and social impact on our society calling for allocation of a great deal of attention and resources. Efforts should be oriented toward the achievement of the most effective and efficient clinical management. The Angiology Unit at the University Hospital of Padova, Italy, developed a performance improvement project to enhance the quality of practice for vascular ulcers. The project consisted in a multistep process comprising a critical revision of the previous clinical process management, staff education, tightening connections between operators and services, and creation of a position for a wound care nurse. The previous standard of practice was modified according to the results of revision and the current evidence-based practice. The new standard of practice reached its full application in September 2015. The number of patients treated and the number of visits in 2015 remained almost unvaried from 2014. However, the total annual expenditure for treating vascular ulcers was reduced by ~60% from the previous year. Standardization of guidelines and practice is effective in creating an efficient clinical management and in reducing the economic burden of vascular ulcers.

  14. BODIES OF KNOWLEDGE IN PROJECT MANAGEMENT AND PROJECT QUALITY MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Tamara Gvozdenovic

    2008-03-01

    Full Text Available One of the main trends is standardization of project management. Some of the most important bodies of knowledge in project management, which were created by professional associations for project management are given in this paper. The main of the project management, apart from minimization of time, resources and costs, is to finish the project in the required quality, i.e. it is very important during the whole process of project management to provide realizing the project without any deviations from the previously set quality standards. Basic processes of project quality management are: quality planning, quality assurance and quality control.

  15. Agile Project Portfolio Management

    DEFF Research Database (Denmark)

    Andersen, Jesper Rank; Riis, Jens Ove; Mikkelsen, Hans

    2005-01-01

    This paper will provide a preliminary introduction to the application of Agile Thinking in management of project portfolio and company development. At any point in time, companies have a crowd of development initiatives spread around the organisation and managed at different levels...... in the managerial hierarchy. They compete for resources and managerial attention, and they often take too long time - and some do not survive in the rapid changing context. Top man¬agers ask for speed, flexibility and effectiveness in the portfolio of development activities (projects). But which competencies...

  16. Implementing clinical process management of vascular wounds in a tertiary facility: impact evaluation of a performance improvement project

    Directory of Open Access Journals (Sweden)

    Avruscio G

    2017-10-01

    Full Text Available Giampiero Avruscio,1,* Ilaria Tocco-Tussardi,1,2,* Greta Bordignon,3 Vincenzo Vindigni2 1Angiology Unit, Department of Cardiac, Thoracic and Vascular Sciences, University Hospital of Padova, Padova, Italy; 2Clinic of Plastic and Reconstructive Surgery, Department of Neurosciences, University Hospital of Padova, Padova, Italy; 3Clinical Management, University Hospital of Padova, Padova, Italy *These authors contributed equally to this work Background: Chronic vascular wounds have a significant economic and social impact on our society calling for allocation of a great deal of attention and resources. Efforts should be oriented toward the achievement of the most effective and efficient clinical management. The Angiology Unit at the University Hospital of Padova, Italy, developed a performance improvement project to enhance the quality of practice for vascular ulcers.Methods: The project consisted in a multistep process comprising a critical revision of the previous clinical process management, staff education, tightening connections between operators and services, and creation of a position for a wound care nurse. The previous standard of practice was modified according to the results of revision and the current evidence-based practice.Results: The new standard of practice reached its full application in September 2015. The number of patients treated and the number of visits in 2015 remained almost unvaried from 2014. However, the total annual expenditure for treating vascular ulcers was reduced by ~60% from the previous year.Conclusion: Standardization of guidelines and practice is effective in creating an efficient clinical management and in reducing the economic burden of vascular ulcers. Keywords: chronic wounds, clinical process management, cost-effectiveness, vascular ulcers

  17. On Services for Collaborative Project Management

    Science.gov (United States)

    Ollus, Martin; Jansson, Kim; Karvonen, Iris; Uoti, Mikko; Riikonen, Heli

    This paper presents an approach for collaborative project management. The focus is on the support of collaboration, communication and trust. Several project management tools exist for monitoring and control the performance of project tasks. However, support of important intangible assets is more difficult to find. In the paper a leadership approach is identified as a management means and the use of new IT technology, especially social media for support of leadership in project management is discussed.

  18. Project management tool

    Science.gov (United States)

    Maluf, David A. (Inventor); Bell, David G. (Inventor); Gurram, Mohana M. (Inventor); Gawdiak, Yuri O. (Inventor)

    2009-01-01

    A system for managing a project that includes multiple tasks and a plurality of workers. Input information includes characterizations based upon a human model, a team model and a product model. Periodic reports, such as a monthly report, a task plan report, a budget report and a risk management report, are generated and made available for display or further analysis. An extensible database allows searching for information based upon context and upon content.

  19. Project Management 2027; The Future of Project Management

    NARCIS (Netherlands)

    Drs. A.J.G. Silvius

    2008-01-01

    This paper describes a study into the expected development of the competences op the project manager in the year 2027. The study was performed amongst the members of IPMA-Netherlands during the summer of 2007. In the study the 46 competences of the International Competence Baseline 3 (ICB 3) were

  20. Performance Management or Performance Based Management?

    OpenAIRE

    Cristina PROTOPOPESCU

    2013-01-01

    In this paper we present some considerations about performance and performance management. Starting with the challenge of defining the performance concept, we intend to establish if „performance management” can be a new management system or it is just a sophisticated term for a HR strategy in order to improve the performance of teams and individuals. We also try to discuss the conection between performance management and management by objectives. Whether or not it is exageratted to talk about...

  1. From project management to project leadership

    NARCIS (Netherlands)

    Braun, F.; Avital, M.

    2010-01-01

    It is virtually a truism that good leadership practices can help project managers with attaining the desired project outcome. However, a better understanding of which leadership practices enable project managers to be more effective warrants further investigation. Subsequently, in this study, we

  2. An IS Project Management Course Project

    Science.gov (United States)

    Frank, Ronald L.

    2010-01-01

    Information Systems curricula should provide project management (PM) theory, current practice, and hands-on experience. The schedule usually does not allow time in Analysis and Design courses for development oriented project management instruction other than a short introduction. Similarly, networking courses usually don't put project management…

  3. SAT project introduction: management issues

    International Nuclear Information System (INIS)

    Kazennov, A.Yu.

    1998-01-01

    Management issues of introducing SAT Project include main objectives and expectations; SAT goal and management; major phases of SAT implementation; project quality assurance; SAT based training system and procedures; role of the project team qualifications

  4. Ensuring effective project management

    International Nuclear Information System (INIS)

    Ward, J.N.

    1980-01-01

    A brief description is given of the organisation methods employed by the Bechtel Power Corporation, in their contract with Mississippi Power and Light Company for the design, construction and procurement activities for the Grand Gulf Nuclear Station. The aim is to ensure effective management, and good communications at all stages of construction, between the project team and the client. (U.K.)

  5. Exploring Project Management Education

    NARCIS (Netherlands)

    Steven Nijhuis

    2017-01-01

    From the article: "The object of this paper is to explore the actual practice in project management education in the Netherlands and compare it to reference institutions and recent literature. A little over 40% of the Higher Education institutions in the Netherlands mentions PM education in

  6. Enhanced project management tool

    Science.gov (United States)

    Hsu, Chen-Jung (Inventor); Patel, Hemil N. (Inventor); Maluf, David A. (Inventor); Moh Hashim, Jairon C. (Inventor); Tran, Khai Peter B. (Inventor)

    2012-01-01

    A system for managing a project that includes multiple tasks and a plurality of workers. Input information includes characterizations based upon a human model, a team model and a product model. Periodic reports, such as one or more of a monthly report, a task plan report, a schedule report, a budget report and a risk management report, are generated and made available for display or further analysis or collection into a customized report template. An extensible database allows searching for information based upon context and upon content. Seven different types of project risks are addressed, including non-availability of required skill mix of workers. The system can be configured to exchange data and results with corresponding portions of similar project analyses, and to provide user-specific access to specified information.

  7. Managing a sensitive project

    International Nuclear Information System (INIS)

    Etcheber, Pascal

    1998-01-01

    A 'sensitive' project needs to be managed differently from a 'normal' project. This statement might seem simple enough. However, it does not seem to be a simple task to prove it in twenty minutes. This paper is an attempt to share with the audience some of the experiences the company had dealing with sensitive projects. It describes what a sensitive project is, though of all people, the 'nuclear' should know. Then the common mistakes are described, that are made in the hoping that some personal experiences are recognised. Finally the company's strategy is shown, how we foster third party support and the main tools to be used. Ultimately, success is ensured by having a sufficient quantity of allies. A sensitive project does not die because it has too many opponents, but because it has too few allies. Finding and helping allies to act is the thrust of our activity. It enables sensitive projects which deserve to succeed to do so, where traditional management fails miserably

  8. Project Success in IT Project Management

    OpenAIRE

    Siddiqui, Farhan Ahmed

    2010-01-01

    The rate of failed and challenged Information Technology (IT) projects is too high according to the CHAOS Studies by the Standish Group and the literature on project management (Standish Group, 2008). The CHAOS Studies define project success as meeting the triple constraints of scope, time, and cost. The criteria for project success need to be agreed by all parties before the start of the project and constantly reviewed as the project progresses. Assessing critical success factors is another ...

  9. Does Lean & Agile Project Management Help Coping with Project Complexity?

    NARCIS (Netherlands)

    Jalali Sohi, A.; Hertogh, M.J.C.M.; Bosch-Rekveldt, M.G.C.; Blom, R.; Serpell, A.; Ferrada, X.

    2016-01-01

    Still, projects in the construction sector are delivered with time delays and cost overruns. One of the reasons for poor performance was assigned to project complexity. A combination of lean construction and agile project management are hypothesized as a possible solution to cope with project

  10. Managing project risks and uncertainties

    Directory of Open Access Journals (Sweden)

    Mike Mentis

    2015-01-01

    Full Text Available This article considers threats to a project slipping on budget, schedule and fit-for-purpose. Threat is used here as the collective for risks (quantifiable bad things that can happen and uncertainties (poorly or not quantifiable bad possible events. Based on experience with projects in developing countries this review considers that (a project slippage is due to uncertainties rather than risks, (b while eventuation of some bad things is beyond control, managed execution and oversight are still the primary means to keeping within budget, on time and fit-for-purpose, (c improving project delivery is less about bigger and more complex and more about coordinated focus, effectiveness and developing thought-out heuristics, and (d projects take longer and cost more partly because threat identification is inaccurate, the scope of identified threats is too narrow, and the threat assessment product is not integrated into overall project decision-making and execution. Almost by definition, what is poorly known is likely to cause problems. Yet it is not just the unquantifiability and intangibility of uncertainties causing project slippage, but that they are insufficiently taken into account in project planning and execution that cause budget and time overruns. Improving project performance requires purpose-driven and managed deployment of scarce seasoned professionals. This can be aided with independent oversight by deeply experienced panelists who contribute technical insights and can potentially show that diligence is seen to be done.

  11. SharePoint 2010 for Project Management

    CERN Document Server

    Sy, Dux

    2012-01-01

    If you were to analyze your team's performance on a typical project, you'd be surprised how much time is wasted on non-productive tasks. This hands-on guide shows you how to work more efficiently by organizing and managing projects with SharePoint 2010. You'll learn how to build a Project Management Information System (PMIS), customized to your project, that can effectively coordinate communication and collaboration among team members. Written by a certified Project Management Professional (PMP) and Microsoft SharePoint MVP with 15 years of IT project management experience, each chapter incl

  12. Web Based Project Management System

    OpenAIRE

    Aadamsoo, Anne-Mai

    2010-01-01

    To increase an efficiency of a product, nowadays many web development companies are using different project management systems. A company may run a number of projects at a time, and requires input from a number of individuals, or teams for a multi level development plan, whereby a good project management system is needed. Project management systems represent a rapidly growing technology in IT industry. As the number of users, who utilize project management applications continues to grow, w...

  13. Graduate Student Project: Operations Management Product Plan

    Science.gov (United States)

    Fish, Lynn

    2007-01-01

    An operations management product project is an effective instructional technique that fills a void in current operations management literature in product planning. More than 94.1% of 286 graduates favored the project as a learning tool, and results demonstrate the significant impact the project had in predicting student performance. The author…

  14. Management & Communication: Project Management Case Study

    CERN Multimedia

    Nathalie Dumeaux

    2004-01-01

    We are pleased to announce the recent launch of a new workshop on Project Management. This is designed for People with budgetary, scheduling and/or organizational responsibilities in a project or a sub-project. The objectives through a management case study specially suited to CERN are: to become familiar with modern management techniques in use for structuring, planning, scheduling, costing and progress monitoring of a project or a sub-project. to understand in-depth issues associated with Deliverable-oriented Project Management, Earned Value Management, Advanced Project Cost Engineering and Project Risk Management. The full description of this workshop can be found here. The next session will be held on 8 October 2004. If you are interested in this workshop, please contact Nathalie Dumeaux, email or 78144. Programme of Seminars October to December 2004 Situation : 21.09.2004 Séminaires bilingues Dates Jours Places disponibles Project Management Case study 8 October 1 oui Intr...

  15. 44 CFR 206.204 - Project performance.

    Science.gov (United States)

    2010-10-01

    ... 44 Emergency Management and Assistance 1 2010-10-01 2010-10-01 false Project performance. 206.204... § 206.204 Project performance. (a) General. This section describes the policies and procedures applicable during the performance of eligible work. (b) Advances of funds. Advances of funds will be made in...

  16. Systems approach to project risk management

    Energy Technology Data Exchange (ETDEWEB)

    Kindinger, J. P. (John P.)

    2002-01-01

    This paper describes the need for better performance in the planning and execution of projects and examines the capabilities of two different project risk analysis methods for improving project performance. A quantitative approach based on concepts and tools adopted from the disciplines of systems analysis, probabilistic risk analysis, and other fields is advocated for managing risk in large and complex research & development projects. This paper also provides an overview of how this system analysis approach for project risk management is being used at Los Alamos National Laboratory along with examples of quantitative risk analysis results and their application to improve project performance.

  17. Switchgear project meticulously managed.

    Science.gov (United States)

    Baillie, Jonathan

    2015-04-01

    Electrical engineering and estates personnel at Sodexo--which manages a wide range of soft and hard facilities management services for five hospitals under a PFI contract at the Manchester Royal Infirmary--have successfully planned, managed, and co-ordinated, a complex electrical engineering project which saw high voltage (HV) switchgear in the site's main intake sub-station dismantled by the supplier to repair a potential earthing mechanism fault which would have prevented individual switchgear panels being shut down, to, for example, cater for renovation of electrical cabling or components cross the site's high voltage network. With detailed planning, including provision for bringing onto site temporary bulk generators, and the formulation of a 600-step switching programme, the replacement of potential faulty driver components in the disconnect mechanism for 20 HV switchgear panels was completed in just four weeks, with minimal interruption to the vast complex's power supply.

  18. Integrated Project Management System description

    International Nuclear Information System (INIS)

    1994-09-01

    The Integrated Program Management System (IPMS) Description is a ''working'' document that describes the work processes of the Uranium Mill Tailings Remedial Action Project Office (UMTRA) and IPMS Group. This document has undergone many revisions since the UMTRA Project began; this revision not only updates the work processes but more clearly explains the relationships between the Project Office, contractors, and other participants. The work process flow style has been revised to better describe Project work and the relationships of participants. For each work process, more background and guidance on ''why'' and ''what is expected'' is given. For example, a description of activity data sheets has been added in the work organization and the Project performance and reporting processes, as well as additional detail about the federal budget process and funding management and improved flow charts and explanations of cost and schedule management. A chapter has been added describing the Cost Reduction/Productivity Improvement Program. The Change Control Board (CCB) procedures (Appendix A) have been updated. Project critical issues meeting (PCIM) procedures have been added as Appendix B. Budget risk assessment meeting procedures have been added as Appendix C. These appendices are written to act as stand-alone documentation for each process. As the procedures are improved and updated, the documentation can be updated separately

  19. Project Management Methodology in Human Resource Management

    Science.gov (United States)

    Josler, Cheryl; Burger, James

    2005-01-01

    When charged with overseeing a project, how can one ensure that the project will be completed on time, within budget, and to the satisfaction of everyone involved? In this article, the authors examine project management methodology as a means of ensuring that projects are conducted in a disciplined, well-managed and consistent manner that serves…

  20. Planning for high performance project teams

    International Nuclear Information System (INIS)

    Reed, W.; Keeney, J.; Westney, R.

    1997-01-01

    Both industry-wide research and corporate benchmarking studies confirm the significant savings in cost and time that result from early planning of a project. Amoco's Team Planning Workshop combines long-term strategic project planning and short-term tactical planning with team building to provide the basis for high performing project teams, better project planning, and effective implementation of the Amoco Common Process for managing projects

  1. Project management and Enterprise systems

    DEFF Research Database (Denmark)

    Koch, Christian; Buhl, Henrik

    2006-01-01

    Implementing and Operating integrated Enterprise Systems are a multidimensional effort. It seriously challenges the IT supplier as well as the professional service provider client. The paper discuss these issues in a project management perspective. A framework for supporting project management...

  2. Agile Project Management For Dummies

    CERN Document Server

    Layton, Mark C

    2012-01-01

    Be flexible and faster with Agile project management As mobile and web technologies continue to evolve rapidly, there is added pressure to develop and implement software projects in weeks instead of months. Agile Project Management For Dummies can make that happen. This is the first book to provide a simple, step-by-step guide to Agile Project Management approaches, tools, and techniques. With the fast pace of mobile and web technology development, software project development must keep pace; Agile Project Management enables developers to complete and implement projects more quickly and this b

  3. CONTEMPORARY TRENDS IN PROJECT MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Ana Argirova

    2015-09-01

    Full Text Available The modern information society in ever increasing business projects and time limits to achieve the objectives at minimum cost leads to a search for ways to manage them. Today, more and more managers use IT tools for project management, and the term itself is associated with software solutions for the optimization and management of projects in different fields of human activity. The paper examines the main characteristics of project management by means of information technology. Key tasks and processes in the project implementation and management are discussed.

  4. Business Intelligence Support For Project Management

    OpenAIRE

    Muntean, Mihaela; Cabau, Liviu Gabiel

    2013-01-01

    With respect to the project management framework, a project live cycle consists of phases like: initiation, planning, execution, monitoring & control and closing. Monitoring implies measuring the progress and performance of the project during its execution and communicating the status. Actual performance is compared with the planned one. Therefore, a minimal set of key performance indicators will be proposed. Monitoring the schedule progress, the project budget and the scope will be possible....

  5. Software Tools Streamline Project Management

    Science.gov (United States)

    2009-01-01

    Three innovative software inventions from Ames Research Center (NETMARK, Program Management Tool, and Query-Based Document Management) are finding their way into NASA missions as well as industry applications. The first, NETMARK, is a program that enables integrated searching of data stored in a variety of databases and documents, meaning that users no longer have to look in several places for related information. NETMARK allows users to search and query information across all of these sources in one step. This cross-cutting capability in information analysis has exponentially reduced the amount of time needed to mine data from days or weeks to mere seconds. NETMARK has been used widely throughout NASA, enabling this automatic integration of information across many documents and databases. NASA projects that use NETMARK include the internal reporting system and project performance dashboard, Erasmus, NASA s enterprise management tool, which enhances organizational collaboration and information sharing through document routing and review; the Integrated Financial Management Program; International Space Station Knowledge Management; Mishap and Anomaly Information Reporting System; and management of the Mars Exploration Rovers. Approximately $1 billion worth of NASA s projects are currently managed using Program Management Tool (PMT), which is based on NETMARK. PMT is a comprehensive, Web-enabled application tool used to assist program and project managers within NASA enterprises in monitoring, disseminating, and tracking the progress of program and project milestones and other relevant resources. The PMT consists of an integrated knowledge repository built upon advanced enterprise-wide database integration techniques and the latest Web-enabled technologies. The current system is in a pilot operational mode allowing users to automatically manage, track, define, update, and view customizable milestone objectives and goals. The third software invention, Query

  6. Nurse managers' challenges in project management.

    Science.gov (United States)

    Suhonen, Marjo; Paasivaara, Leena

    2011-11-01

    To analyse the challenges that nurse managers meet in project management. Project management done by nurse managers has a significant role in the success of projects conducted in work units. The data were collected by open interviews (n = 14). The participants were nurse managers, nurses and public health nurses. Data analysis was carried out using qualitative content analysis. The three main challenges nurse managers faced in project management in health-care work units were: (1) apathetic organization and management, (2) paralysed work community and (3) cooperation between individuals being discouraged. Nurse managers' challenges in project management can be viewed from the perspective of the following paradoxes: (1) keeping up projects-ensuring patient care, (2) enthusiastic management-effective management of daily work and (3) supporting the work of a multiprofessional team-leadership of individual employees. It is important for nurse managers to learn to relate these paradoxes to one another in a positive way. Further research is needed, focusing on nurse managers' ability to promote workplace spirituality, nurse managers' emotional intelligence and their enthusiasm in small projects. © 2011 Blackwell Publishing Ltd.

  7. Fleet management performance monitoring.

    Science.gov (United States)

    2013-05-01

    The principle goal of this project was to enhance and expand the analytical modeling methodology previously developed as part of the Fleet Management Criteria: Disposal Points and Utilization Rates project completed in 2010. The enhanced and ex...

  8. Project and Sports Events Management

    OpenAIRE

    Sebastian Madalin MUNTEANU

    2011-01-01

    This paper tries to capture the importance it holds the project management in socio-cultural sector which stands out when we refer to the sport. So when we talk about project management in sport, to consider a much larger vision, a new project management perspective, they involve a responsibility for the implementation of an event with global impact on very long term. Sports projects, as history shows us, played a significant role in developing societies. Also, all major sports industry proje...

  9. Project Portfolio Management Applications Testing

    OpenAIRE

    Paul POCATILU

    2006-01-01

    Many IT companies are running project simultaneously. In order to achieve the best results, they have to group to the project in portfolios, and to use specific software that helps to manage them. Project portfolio management applications have a high degree of complexity and they are very important for the companies that are using it. This paper focuses on some characteristics of the testing process for project portfolio management applications

  10. Project Portfolio Management Applications Testing

    Directory of Open Access Journals (Sweden)

    Paul POCATILU

    2006-01-01

    Full Text Available Many IT companies are running project simultaneously. In order to achieve the best results, they have to group to the project in portfolios, and to use specific software that helps to manage them. Project portfolio management applications have a high degree of complexity and they are very important for the companies that are using it. This paper focuses on some characteristics of the testing process for project portfolio management applications

  11. Oil sands tailings management project

    Energy Technology Data Exchange (ETDEWEB)

    Godwalt, C. [Alberta WaterSMART, Calgary, AB (Canada); Kotecha, P. [Suncor Energy Inc, Calgary, AB (Canada); Aumann, C. [Alberta Innovates - Technology Futures, Alberta Governement, AB (Canada)

    2010-11-15

    The Oil sands leadership initiative (OSLI) works with the Government of Alberta on the development of the oil sands industry, considering environmental, economical and social aspects. Water management was identified as one of most important areas to focus on. Alberta WaterSMART was requested to support the development and the management of projects resulting from the work done or underway in this field. The development of a regional water management solution stood out as the most interesting solution to obtain significant results. In the Athabasca Region, oil sands producers work independently on their water sourcing and disposal with particular attention to fresh water conservation and economics. The Athabasca River represents a source for mines and distant saline aquifers are the target of steam assisted gravity drainage (SAGD) operators. As part of a four-phase project aiming to study the environmental and economic footprint (EEF) benefit of alternatives for Athabasca oil sands production water supply and disposal, the purpose of the tailings water management project was to identify tailings treatment technologies that are ready to be implemented, and to design and evaluate solutions in order to improve regional oil sands production water sourcing and disposal. Alternatives were evaluated based on their total EEF, applying a lifecycle assessment methodology with a particular attention on the quantification of important performance indicators. 25 refs., 8 tabs., 40 figs.

  12. Oil sands tailings management project

    International Nuclear Information System (INIS)

    Godwalt, C.; Kotecha, P.; Aumann, C.

    2010-11-01

    The Oil sands leadership initiative (OSLI) works with the Government of Alberta on the development of the oil sands industry, considering environmental, economical and social aspects. Water management was identified as one of most important areas to focus on. Alberta WaterSMART was requested to support the development and the management of projects resulting from the work done or underway in this field. The development of a regional water management solution stood out as the most interesting solution to obtain significant results. In the Athabasca Region, oil sands producers work independently on their water sourcing and disposal with particular attention to fresh water conservation and economics. The Athabasca River represents a source for mines and distant saline aquifers are the target of steam assisted gravity drainage (SAGD) operators. As part of a four-phase project aiming to study the environmental and economic footprint (EEF) benefit of alternatives for Athabasca oil sands production water supply and disposal, the purpose of the tailings water management project was to identify tailings treatment technologies that are ready to be implemented, and to design and evaluate solutions in order to improve regional oil sands production water sourcing and disposal. Alternatives were evaluated based on their total EEF, applying a lifecycle assessment methodology with a particular attention on the quantification of important performance indicators. 25 refs., 8 tabs., 40 figs.

  13. Rethinking Project Management in Denmark

    DEFF Research Database (Denmark)

    Svejvig, Per

    2012-01-01

    . The chapter argues for a rethinking process due to pervasiveness and complexity in the contemporary project environment where rethinking is needed in order to stay competitive. The suggested approach for the rethinking project management is a framing process where body of ideas is established......Projects are everywhere across different sectors, industries and countries. Project management is no longer a sub-discipline of engineering and other rather technical disciplines but is also used for many other purposes. Even though practice has changed dramatically over the years, the models...... and methodologies for project management has been fairly static and has therefore received substantial criticism for a lack of relevance to practice. Several scholars have therefore started to think more widely about projects and project management conceptualized as rethinking project management. However this theme...

  14. Management of research and development project

    International Nuclear Information System (INIS)

    Go, Seok Hwa; Hong Jeong Yu; Hyun, Byeong Hwan

    2010-12-01

    This book introduces summary on management of research and development project, prepare of research and development with investigation and analysis of paper, patent and trend of technology, structure of project, management model, management of project, management of project range, management of project time, management of project cost, management of project goods, management of project manpower, management of communication, management of project risk, management of project supply, management of outcome of R and D, management of apply and enroll of patent and management of technology transfer.

  15. Project management: importance for diagnostic laboratories.

    Science.gov (United States)

    Croxatto, A; Greub, G

    2017-07-01

    The need for diagnostic laboratories to improve both quality and productivity alongside personnel shortages incite laboratory managers to constantly optimize laboratory workflows, organization, and technology. These continuous modifications of the laboratories should be conducted using efficient project and change management approaches to maximize the opportunities for successful completion of the project. This review aims at presenting a general overview of project management with an emphasis on selected critical aspects. Conventional project management tools and models, such as HERMES, described in the literature, associated personal experience, and educational courses on management have been used to illustrate this review. This review presents general guidelines of project management and highlights their importance for microbiology diagnostic laboratories. As an example, some critical aspects of project management will be illustrated with a project of automation, as experienced at the laboratories of bacteriology and hygiene of the University Hospital of Lausanne. It is important to define clearly beforehand the objective of a project, its perimeter, its costs, and its time frame including precise duration estimates of each step. Then, a project management plan including explanations and descriptions on how to manage, execute, and control the project is necessary to continuously monitor the progression of a project to achieve its defined goals. Moreover, a thorough risk analysis with contingency and mitigation measures should be performed at each phase of a project to minimize the impact of project failures. The increasing complexities of modern laboratories mean clinical microbiologists must use several management tools including project and change management to improve the outcome of major projects and activities. Copyright © 2017 The Author(s). Published by Elsevier Ltd.. All rights reserved.

  16. Project Management in Higher Education

    Science.gov (United States)

    Alpert, Shannon Atkinson

    2011-01-01

    This study identified factors that influenced the use of project management in higher education research projects. Using a qualitative grounded theory approach that included in-depth interviews with assistant professors, the researcher examined how these individuals were using project management processes and tools and factors that enabled,…

  17. Comprehensive management of project changes

    Directory of Open Access Journals (Sweden)

    Aljaž Stare

    2010-06-01

    Full Text Available The goal of this research was to examine how project changes can be prevented, and how to reduce their negative impact. Theoretical research examined risk management, project control and change management. Based on the study a “Comprehensive Change Management Model” was developed and verified after conducting empirical research in Slovenian enterprises. The research confirmed that risk management identifies possible changes and reduces their impact; project control ensures the timely detection of changes and an efficient response, while formal change management ensures the effective implementation of changes. The combined functioning of all three areas ensures effective project execution.

  18. Risk management in nuclear projects

    International Nuclear Information System (INIS)

    Salles, Claudio J.R.

    2002-01-01

    The risk management will be defined by different aspects: danger or loss possibility, or responsibility for damage. The risk management is one stage of project management. The risk management is a continuous process of planning, identification, quantification, answer and risk control to maximize the success potential of activity. The reduction of risk is part of priority establishment. This work will indicate how introduce this important instrument in the management of nuclear projects. (author)

  19. Project management in building industry management

    Directory of Open Access Journals (Sweden)

    Martin Nový

    2012-01-01

    Full Text Available The article deals with contents of the project management on general level first. It mentions the most widespread project management standards, which have historically developed in global scale, their parts and objectives. Further, it describes position of the building industry in national economy, its specific features distinguishing it from the other industrial production, contents of the building industry management and project management of structures. The importance of the role of project manager is documented by characteristics of construction projects, their course, contents of sub-phases, and individual types of managing activities. Attention is devoted to project planning – determination of realization costs, necessary resources, sequence and time course of individual works. The most frequently used graphic methods of schedule presentation – Gantt chart, network chart and frequency bar chart are applied on examples of constructions. These charts can be focused in time sequence on individual types of resources – workforce, finance, materials, energies, and machinery. In conclusion, necessity to manage the project management procedures is emphasized as a part of skills of a construction engineer in the role of preparation manager or construction project realization manager.

  20. Identifying High Performance ERP Projects

    OpenAIRE

    Stensrud, Erik; Myrtveit, Ingunn

    2002-01-01

    Learning from high performance projects is crucial for software process improvement. Therefore, we need to identify outstanding projects that may serve as role models. It is common to measure productivity as an indicator of performance. It is vital that productivity measurements deal correctly with variable returns to scale and multivariate data. Software projects generally exhibit variable returns to scale, and the output from ERP projects is multivariate. We propose to use Data Envelopment ...

  1. Global Project Management: Graduate Course

    National Research Council Canada - National Science Library

    Beranek, Thomas R

    2006-01-01

    ..., A. James Clark School of Engineering - Project Management Program. The course slides and suggested readings provide a general exploration of the nuances of doing projects globally as compared to domestically...

  2. Software Support for the Classical, Contemporary and Future Project Management

    OpenAIRE

    Jakov Crnkovic; Peter Ross; Sanjay Desai

    2006-01-01

    The volume and complexity of Project Management (PM) raises many questions for managers. What exactly are we managing? People? Performance? Efficiency? Effectiveness? Cost? Time? At what levels do projects become challenging and worthy of significant management attention? Can some projects be left on auto-pilot? Must others be managed more aggressively? What metrics are useful in Project Management? How can they be integrated with normal performance metrics in the organization? How can metric...

  3. From Project Management to Process Management - Effectively Organising Transdisciplinary Projects

    OpenAIRE

    Moschitz, Heidrun

    2013-01-01

    In transdisciplinary projects, the roles of researchers change. In addition to being a source of knowledge, they are required to engage in knowledge exchange processes. This results in an alteration at project level: researchers need to creatively manage projects as group processes.

  4. Using Options to Manage Dynamic Uncertainty in Acquisition Projects

    National Research Council Canada - National Science Library

    Ceylan, B. K; Ford, David N

    2002-01-01

    Uncertainty in acquisition projects and environments can degrade performance. Traditional project planning, management tools, and methods can effectively deal with uncertainties in relatively stable environments...

  5. Mobile Project Management

    Directory of Open Access Journals (Sweden)

    Catalin BOJA

    2006-01-01

    Full Text Available Based on the development of new communication and data transfer technologies, the mobile solutions for the management process have been able to provide new ways to conduct management actions. This environment describes methods and tools available only here, which will bring information, speed and efficiency to any stage and component of the management process. The paper takes into discussion the impact of the technological development on the management process paradigm. The paper presents the main aspects regarding the business and management models used in mobile management. The role of mobile multimedia informatics applications in mobile management is highlighted.

  6. Making sense of project management

    DEFF Research Database (Denmark)

    Kjærgaard, Annemette; Kautz, Karl; Nielsen, Peter Axel

    2007-01-01

    How can a software company make sense of project management when it becomes involved in software process improvement? In software development most research has an instrumental view of knowledge management thus neglecting what is probably the most important part of knowledge management namely making...... sense of practice by developers and project managers. Through an action case, we study the knowledge management processes in a Danish software company. We analyse the case through the lens of a theoretical framework. The theoretical framework focuses in particular on sensemaking, collective construed...... substantial insight which could not have been achieved through an instrumental perspective on knowledge management....

  7. Project Management Personnel Competencies Evaluation

    Directory of Open Access Journals (Sweden)

    Paul POCATILU

    2006-01-01

    Full Text Available An important factor for the success management of IT projects is the human resource. People involved in the project management process have to be evaluated. In order to do that, same criteria has to be specified. This paper describes some aspects regarding the personnel evaluation.

  8. Application of Project Portfolio Management

    Science.gov (United States)

    Pankowska, Malgorzata

    The main goal of the chapter is the presentation of the application project portfolio management approach to support development of e-Municipality and public administration information systems. The models of how people publish and utilize information on the web have been transformed continually. Instead of simply viewing on static web pages, users publish their own content through blogs and photo- and video-sharing slides. Analysed in this chapter, ICT (Information Communication Technology) projects for municipalities cover the mixture of the static web pages, e-Government information systems, and Wikis. So, for the management of the ICT projects' mixtures the portfolio project management approach is proposed.

  9. 6 Project-Management Tips

    Science.gov (United States)

    Demski, Jennifer

    2012-01-01

    When it comes to project management, the IT department is typically its own worst enemy. When project requests are pushed through the budgeting process by different departments, it's up to IT to make them all work. The staff is required to be "heroic" to get the project load done. People get to work over weekends and postpone their vacations. The…

  10. Managing regional innovation strategy projects

    OpenAIRE

    Wolf, Patricia; Hanisch, Christoph

    2014-01-01

    This paper presents a qualitative interview study with 28 RIS project managers that aimed at understanding whether or not this is true in the context of regional innovation and what the specifics of managing regional innovation projects are. In taking up a recent claim for policy intervention studies which allow to “derive precise suggestions for their design and management”.  The study investigated the interrelation between the agility of the management approach and the achievements of RIS p...

  11. Methodologies used in Project Management

    OpenAIRE

    UNGUREANU, Adrian; UNGUREANU, Anca

    2014-01-01

    Undoubtedly, a methodology properly defined and strictly followed for project management provides a firm guarantee that the work will be done on time, in budget and according to specifications. A project management methodology in simple terms is a “must-have” to avoid failure and reduce risks, because is one of the critical success factors, such basic skills of the management team. This is the simple way to guide the team through the design and execution phases, processes and tasks throughout...

  12. EDUCATIONAL PROJECTS STAKEHOLDER MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Юлія Юріївна ГУСЄВА

    2016-02-01

    Full Text Available An approach based on an integration of requirements breakdown structure and work breakdown structure of the project is proposed. It can complement existing methods of project stakeholders classification with the indicator of resource input, which can be defined in monetary terms. A method of requirements monitoring is proposed, which allows you to track the requirements of project stakeholders over time according to the actual amount of resources spent by analogy with the earned value method. Proposed indexes are the basis not only for monitoring but for the forecast of the project. The need of creating of a mechanism for getting baseline data taking into account the existence of different types of requirements of project stakeholders is grounded.

  13. PROJECT - RESOURCE MANAGEMENT OF INNOVATIONS IN EDUCATION: ANTHROPOLOGICAL PROJECTION

    Directory of Open Access Journals (Sweden)

    Galina Aleksandrovna Ignat’eva

    2015-08-01

    Full Text Available The purpose of the research was to denote a way to solve the problem of education mana-gement ΄s insufficient efficiency considered from the point of view of education opportunities to influence on the formation of mechanisms for sustainable development of society as a whole and its educational component. The concept «project-resource management of innovation in education» regarded on the basis of the anthropological project-transforming paradigm. Conceptually-categorical context presented by conceptual cluster composed of coordinated concepts «project», «resource», «educational reality», «organizational-resource potential», «project commonality». In the theoretical part of the study on the basis of analysis of the normative and exploratory approaches to educational innovations organization and management it was established the search approach ΄s leading role in the methodological substantiation of project-resource management. The study have indicated that in the presence of variable models of innovation management in education, corresponding to various predictive models of continuing education post-industrial society, project-resource management is an universal mechanism for the transition from separate innovation΄s precedents to the an authentic reality of innovative education. In the technological part of the study the main concern was to submit the project-resource management by the management goal’s system, each of which includes the specific management actions, projected results and the organizational forms. The project-resource management ΄s professional – activity context of the study showed evolution of managerial positions: an effective performer – an effective leader – strategist, implemented during the transition from directly directive management to the project management and further to the project-resource management. Based on the findings identified the key factors of initiatively-problem projects

  14. Waste Management Process Improvement Project

    International Nuclear Information System (INIS)

    Atwood, J.; Borden, G.; Rangel, G. R.

    2002-01-01

    The Bechtel Hanford-led Environmental Restoration Contractor team's Waste Management Process Improvement Project is working diligently with the U.S. Department of Energy's (DOE) Richland Operations Office to improve the waste management process to meet DOE's need for an efficient, cost-effective program for the management of dangerous, low-level and mixed-low-level waste. Additionally the program must meet all applicable regulatory requirements. The need for improvement was highlighted when a change in the Groundwater/Vadose Zone Integration Project's waste management practices resulted in a larger amount of waste being generated than the waste management organization had been set up to handle

  15. Information management for decommissioning projects

    International Nuclear Information System (INIS)

    LeClair, A.N.; Lemire, D.S.

    2011-01-01

    This paper explores the importance of records and information management for decommissioning projects. Key decommissioning information and elements of a sound information management strategy are identified. Various knowledge management strategies and tools are discussed as opportunities for leveraging decommissioning information. The paper also examines the implementation of Atomic Energy of Canada Limited's (AECL) strategy for the long term preservation of decommissioning information, and its initiatives in leveraging of information with the application of several knowledge management strategies and tools. The implementation of AECL's strategy illustrates common as well as unique information and knowledge management challenges and opportunities for decommissioning projects. (author)

  16. Project Management Plan Solution Stabilization

    Energy Technology Data Exchange (ETDEWEB)

    SATO, P.K.

    1999-08-31

    This plan presents the overall objectives, description, justification and planning for the Plutonium Finishing Plant (PFP) Solutions Stabilization subproject. The intent of this plan is to describe how this project will be managed and integrated with other facility stabilization and deactivation activities. This plan supplements the overall integrated plan presented in the Integrated Project Management Plan (IPMP) for the Plutonium Finishing Plant Stabilization and Deactivation Project, HNF-3617. This project plan is the top-level definitive project management document for the PFP Solution Stabilization subproject. It specifies the technical, schedule, requirements and the cost baselines to manage the execution of the Solution Stabilization subproject. Any deviations to the document must be authorized through the appropriate change control process.

  17. Project Management Plan Solution Stabilization

    International Nuclear Information System (INIS)

    SATO, P.K.

    1999-01-01

    This plan presents the overall objectives, description, justification and planning for the Plutonium Finishing Plant (PFP) Solutions Stabilization subproject. The intent of this plan is to describe how this project will be managed and integrated with other facility stabilization and deactivation activities. This plan supplements the overall integrated plan presented in the Integrated Project Management Plan (IPMP) for the Plutonium Finishing Plant Stabilization and Deactivation Project, HNF-3617. This project plan is the top-level definitive project management document for the PFP Solution Stabilization subproject. It specifies the technical, schedule, requirements and the cost baselines to manage the execution of the Solution Stabilization subproject. Any deviations to the document must be authorized through the appropriate change control process

  18. HBR guide to project management

    CERN Document Server

    Harvard Business Review

    2013-01-01

    MEET YOUR GOALS—ON TIME AND ON BUDGET. How do you rein in the scope of your project when you’ve got a group of demanding stakeholders breathing down your neck? And map out a schedule everyone can stick to? And motivate team members who have competing demands on their time and attention? Whether you’re managing your first project or just tired of improvising, this guide will give you the tools and confidence you need to define smart goals, meet them, and capture lessons learned so future projects go even more smoothly. The HBR Guide to Project Management will help you: • Build a strong, focused team • Break major objectives into manageable tasks • Create a schedule that keeps all the moving parts under control • Monitor progress toward your goals • Manage stakeholders’ expectations • Wrap up your project and gauge its success

  19. Managing the "Performance" in Performance Management.

    Science.gov (United States)

    Repinski, Marilyn; Bartsch, Maryjo

    1996-01-01

    Describes a five-step approach to performance management which includes (1) redefining tasks; (2) identifying skills; (3) determining what development tools are necessary; (4) prioritizing skills development; and (5) developing an action plan. Presents a hiring model that includes job analysis, job description, selection, goal setting, evaluation,…

  20. Competency model for the project managers of technical projects

    Science.gov (United States)

    Duncan, William R.

    1992-05-01

    Traditional job description techniques were developed to support compensation decisions for hourly wage earners in a manufacturing environment. Their resultant focus on activities performed on the job works well in this environment where the ability to perform the activity adequately is objectively verifiable by testing and observation. Although many organizations have adapted these techniques for salaried employees and service environments, the focus on activities performed has never been satisfactory. For example, stating that a project manager `prepares regular project status reports' tells us little about what to look for in a potential project manager or how to determine if a practicing project manager is ready for additional responsibilities. The concept of a `competency model' has been developed within the last decade to address this shortcoming. Competency models focus on what skills are needed to perform the tasks defined by the job description. For example, a project manager must be able to communicate well both orally and in writing in order to `prepare regular project status reports.'

  1. Agile Project Management with Scrum

    CERN Document Server

    Schwaber, Ken

    2009-01-01

    The rules and practices for Scrum-a simple process for managing complex projects-are few, straightforward, and easy to learn. But Scrum's simplicity itself-its lack of prescription-can be disarming, and new practitioners often find themselves reverting to old project management habits and tools and yielding lesser results. In this illuminating series of case studies, Scrum co-creator and evangelist Ken Schwaber identifies the real-world lessons-the successes and failures-culled from his years of experience coaching companies in agile project management. Through them, you'll understand how to

  2. PROJECT MANAGER SKILLS, RISK MANAGEMENT TOOLS

    Directory of Open Access Journals (Sweden)

    Vladut Iacob

    2013-12-01

    Full Text Available Although the projects are different from each other there are many common things that contribute to their success. Looked overall, the success of a project is the result of a multitude of factors. This person is considered the "engine" of the project. The man who makes the action set for the achievement of project objectives to be brought to an end. The project manager must have the technical knowledge and economic diverse. He should be able to choose a team and lead. You must be tenacious, combative, to know how to communicate both within the team and beyond. In a word, the project manager must have an impressive stock of knowledge, skills and abilities and appreciate as Peter Drucker, to "exist for the organization. To be its servant. Any management who forget this will only cause damage to the organization. "This study will focus on highlighting the skills of the project manager and their role in managing difficult situations or risk.

  3. Analysis Of Performance Factors Of Construction Management Consultant Affecting The Failure In Achieving Time And Quality Targets On Construction Project Of Samarinda Baru Airport

    OpenAIRE

    Maryudi Utomo; Kustamar; Bambang Wedyantadji

    2017-01-01

    This research aims to determine the performance factors of construction management consultants affecting the failure in achieving time and quality targets on construction project of Samarinda Baru Airport. This research uses survey method by collecting respondents opinion experience and attitude by taking primary data from questionnaires and secondary data from related institutions. The results of the research are 1 Factors directly affecting the Time Target Y1 are the Understanding of Contra...

  4. Persistent dysphonia in two performers affecting the singing and projected speaking voice: a report on a collaborative approach to management.

    Science.gov (United States)

    Baker, Janet

    2002-01-01

    The projected speaking voice and the singing voice are highly sensitive to external and internal influences, and teachers of spoken voice and singing are in a unique position to identify subtle and more serious vocal difficulties in their students. Persistent anomalies may herald early onset of changes in vocal fold structure, neurophysiological control, or emotional stability. Two cases are presented to illustrate the benefits of a collaborative approach to diagnosis and management. The first, a 21-year-old male drama and singing student with an abnormally high speaking voice and falsetto singing voice was found to have a psychogenic dysphonia referred to as "puberphonia" or "mutational falsetto". The second, a 34-year-old female alto with strained phonation and perceived stutter of the vocal folds was diagnosed with "adductor spasmodic dysphonia" or "focal laryngeal dystonia" of neurological origin.

  5. WIPP Project Records Management Handbook

    International Nuclear Information System (INIS)

    1991-01-01

    The Waste Isolation Pilot Plant (WIPP) Records Management Handbook provides the WIPP Project Records Management personnel with a tool to use to fulfill the requirements of the WIPP Records Program and direct their actions in the important area of records management. The handbook describes the various project areas involved in records management, and how they function. The handbook provides the requirements for Record Coordinators and Master Record Center (MRC) personnel to follow in the normal course of file management, records scheduling, records turnover, records disposition, and records retrieval. More importantly, the handbook provides a single reference which encompasses the procedures set fourth in DOE Order 1324.2A, ''Records Disposition'' ASME NQA-1, ''Quality Assurance Program Requirements for Nuclear Facilities'' and DOE-AL 5700.6B, ''General Operations Quality Assurance.'' These documents dictate how an efficient system of records management will be achieved on the WIPP Project

  6. Management systems for environmental restoration projects

    International Nuclear Information System (INIS)

    Harbert, R.R.

    1990-01-01

    This paper reports that the success fo large environmental restoration projects depends on sound management systems to guide the team of organizations and individuals responsible for the project. Public concern about and scrutiny of these environmental projects increase the stakes for those involved in the management of projects. The Department of Energy (DOE) Formerly Utilized Sites Remedial Action Program (FUSRAP) uses a system approach to performing and improving the work necessary to meet FUSRAP objectives. This approach to preforming and improving the work necessary to meet FUSRAP objectives. This approach is based upon management criteria embodied in DOE cost and schedule control system and the quality assurance requirements. The project team used complementary criteria to develop a system of related parts and processes working together to accomplish the goals of the project

  7. Good performance in nuclear projects

    International Nuclear Information System (INIS)

    1989-01-01

    The nuclear industry has demonstrated good performance in many areas relating to the design, engineering, construction and operation of nuclear facilities. This report of an international symposium held in Tokyo highlights examples of good performance in nuclear projects which can aid the industry in seeking even better performance, thus strengthening the contribution nuclear energy can make to sustainable economic growth

  8. Effective Safety Management in Construction Project

    Science.gov (United States)

    Othman, I.; Shafiq, Nasir; Nuruddin, M. F.

    2017-12-01

    Effective safety management is one of the serious problems in the construction industry worldwide, especially in large-scale construction projects. There have been significant reductions in the number and the rate of injury over the last 20 years. Nevertheless, construction remains as one of the high risk industry. The purpose of this study is to examine safety management in the Malaysian construction industry, as well as to highlight the importance of construction safety management. The industry has contributed significantly to the economic growth of the country. However, when construction safety management is not implemented systematically, accidents will happen and this can affect the economic growth of the country. This study put the safety management in construction project as one of the important elements to project performance and success. The study emphasize on awareness and the factors that lead to the safety cases in construction project.

  9. Agile project management managing for success

    CERN Document Server

    Crowder, James A

    2015-01-01

    Management and enables them to deal with the demands and complexities of modern, agile systems/software/hardware development teams. The book examines the project/program manager beyond the concepts of leadership and aims to connect to employees' sense of identity. The text examines human psychological concepts such as "locus of control," which will help the manager understand their team members' view and how best to manage their "world" contributions. The authors cover new management tools and philosophies for agile systems/software/hardware development teams, with a specific focus on how this

  10. Knowledge Model: Project Knowledge Management

    DEFF Research Database (Denmark)

    Durao, Frederico; Dolog, Peter; Grolin, Daniel

    2009-01-01

    The Knowledge model for project management serves several goals:Introducing relevant concepts of project management area for software development (Section 1). Reviewing and understanding the real case requirements from the industrial perspective. (Section 2). Giving some preliminary suggestions...... for usage in KIWI system (Sections 3). This document is intended for technological partners to understand how for example the software development concepts can be applied to a semantic wiki framework....

  11. Towards rethinking Project portfolio management

    DEFF Research Database (Denmark)

    Hansen, Lars Kristian; Svejvig, Per

    the last five years. Utilizing the theoretical lens proposed by Svejvig and Andersen (2015), we apply two complementary analytical perspectives to classify and analyze the stocks. One perspective, denoted as classical project management (CPM), highlights key characteristics of conventional research....... A second perspective, denoted as rethinking project management (RPM), highlights characteristics of progressive research. Not surprisingly, characteristics from CPM are very dominant in the stock of most cited publications of all years — instrumentality and controllability in particular. In the newest...

  12. RISK MANAGEMENT USING PROJECT RECON

    Science.gov (United States)

    2016-11-28

    centralized database . • Project Recon (formerly Risk Recon) is designed to be used by all Program Management Offices, Integrated Project Teams and any...Create growth plans to proactively capture benefits • Customize reports to group opportunities by programmatic, technical, business, contracting, and

  13. EVALUATION OF THE PROJECT MANAGEMENT ORGANISATIONAL ABILITY OF PUBLIC ORGANISATIONS

    OpenAIRE

    Florescu Margareta

    2012-01-01

    The quality of the results of a project or a public programme, as well as the quality of project management consist in management process performance.This analysis tool promotes the idea of initiating a new organisational/functional policy – organisational tools regarding project management, a new standard concerning the complexity of the project and the associated risk, as well as a new standard concerning the project management organisational/functional ability. Political decision makers,...

  14. The Performability Manager

    NARCIS (Netherlands)

    Franken, Leonard J.N.; Haverkort, Boudewijn R.H.M.

    1994-01-01

    The authors describe the performability manager, a distributed system component that contributes to a more effective and efficient use of system components and prevents quality of service (QoS) degradation. The performability manager dynamically reconfigures distributed systems whenever needed, to

  15. Management Of Building Projects

    OpenAIRE

    Niko Majdandzic; Tadija Lovric; Vido Peric

    2006-01-01

    In this work we have shown the concept of logistic support in management in building production and in building of objects, which is realised in Enterprise resource Planning – ERP system ERPINSG, developed in Informatic firm Informatic engineering – ININ in Slavonski Brod, and in cooperation with scientists of catedra for informatics of Faculty of Mechanical Engineering and users from building firms.

  16. Strategic Management of Large Projects

    Institute of Scientific and Technical Information of China (English)

    WangYingluo; LiuYi; LiYuan

    2004-01-01

    The strategic management of large projects is both theoretically and practically important. Some scholars have advanced flexible strategy theory in China. The difference of strategic flexibility and flexible strategy is pointed out. The supporting system and characteristics of flexible strategy are analyzed. The changes of flexible strategy and integration of strategic management are discussed.

  17. Project management in crisis situations

    Directory of Open Access Journals (Sweden)

    Agnieszka Goździewska-Nowicka

    2017-05-01

    Full Text Available In today’s methodologies of project management attention is increasingly paid to the crises-related issues. Modern economy and the turbulent environment cause that an emergingcrisis can pose a serious threat to the implementation of any undertaking. This article focuses on the presentation of the conditions and causes of crisis situations, the essence of projects, and their effective management. The major objective of the paper, however, is to demonstrate how companies implementing projects cope with the occurrence of a crisis situation.

  18. Project safety studies - nuclear waste management (PSE)

    International Nuclear Information System (INIS)

    1981-10-01

    The project 'Safety Studies-Nuclear Waste Management' (PSE) is a research project performed by order of the Federal Minister for Research and Technology, the general purpose of which is to deepen and ensure the understanding of the safety aspects of the nuclear waste management and to prepare a risk analysis which will have to be established in the future. Owing to this the project is part of a series of projects which serve the further development of the concept of nuclear waste management and its safety, and which are set up in such a way as to accompany the realization of that concept. This report contains the results of the first stage of the project from 1978 to mid-1981. (orig./RW) [de

  19. Document Management Projects: implementation guide

    OpenAIRE

    Beatriz Bagoin Guimarães

    2016-01-01

    Records Management System implementation is a complex process that needs to be executed by a multidisciplinary team and involves components of apparently non-related areas such as archival science, computer engineering, law, project management and human resource management. All of them are crucial and complementary to guarantee a full and functional implementation of a system and a perfect fusion with the connected processes and procedures. The purpose of this work is to provide organizations...

  20. Waste Management Project Contingency Analysis

    International Nuclear Information System (INIS)

    Edward L. Parsons, Jr.

    1999-01-01

    The purpose of this report is to provide the office of Waste Management (WM) with recommended contingency calculation procedures for typical WM projects. Typical projects were defined as conventional construction-type activities that use innovative elements when necessary to meet the project objectives. Projects involve treatment, storage, and disposal of low level, mixed low level, hazardous, transuranic, and high level waste. Cost contingencies are an essential part of Total Cost Management. A contingency is an amount added to a cost estimate to compensate for unexpected expenses resulting from incomplete design, unforeseen and unpredictable conditions, or uncertainties in the project scope (DOE 1994, AACE 1998). Contingency allowances are expressed as percentages of estimated cost and improve cost estimates by accounting for uncertainties. The contingency allowance is large at the beginning of a project because there are more uncertainties, but as a project develops, the allowance shrinks to adjust for costs already incurred. Ideally, the total estimated cost remains the same throughout a project. Project contingency reflects the degree of uncertainty caused by lack of project definition, and process contingency reflects the degree of uncertainty caused by use of new technology. Different cost estimation methods were reviewed and compared with respect to terminology, accuracy, and Cost Guide standards. The Association for the Advancement of Cost Engineering (AACE) methods for cost estimation were selected to represent best industry practice. AACE methodology for contingency analysis can be readily applied to WM Projects, accounts for uncertainties associated with different stages of a project, and considers both project and process contingencies and the stage of technical readiness. As recommended, AACE contingency allowances taper off linearly as a project nears completion

  1. Document Management Projects: implementation guide

    Directory of Open Access Journals (Sweden)

    Beatriz Bagoin Guimarães

    2016-12-01

    Full Text Available Records Management System implementation is a complex process that needs to be executed by a multidisciplinary team and involves components of apparently non-related areas such as archival science, computer engineering, law, project management and human resource management. All of them are crucial and complementary to guarantee a full and functional implementation of a system and a perfect fusion with the connected processes and procedures. The purpose of this work is to provide organizations with a basic guide to Records Management Project implementation beginning with the steps prior to acquiring the system, following with the main project activities and concluding with the post implementation procedures of continuous improvement and system maintenance.

  2. Integrated project management type contracts

    International Nuclear Information System (INIS)

    Heisler, S.I.

    1975-01-01

    The concept of integrated project management represents a single source to which the owner can turn for all project management functions excepting for those relating to outside parties such as site purchase, personnel selection etc. Other functions such as design, procurement, construction management, schedule and cost control, quality assurance/quality control are usually handled by the integrated project manager as the agent of the owner. The arrangement is flexible and the responsibilities can be varied to suit the size and experience of the owner. Past experience in the United States indicates an increase in the trend toward IPM work and it appears that overseas this trend is developing also. (orig./RW) [de

  3. Planning and Managing Drupal Projects

    CERN Document Server

    Nordin, Dani

    2011-01-01

    If you're a solo website designer or part of a small team itching to build interesting projects with Drupal, this concise guide will get you started. Drupal's learning curve has thrown off many experienced designers, particularly the way it handles design challenges. This book shows you the lifecycle of a typical Drupal project, with emphasis on the early stages of site planning. Learn how to efficiently estimate and set up your own project, so you can focus on ways to make your vision a reality, rather than let project management details constantly distract you. Plan and estimate your projec

  4. Cultural differences in Research project management

    Science.gov (United States)

    Barbier, Michele

    2016-04-01

    Scientific Projects today have increased in complexity, requiring multidisciplinarity, and requiring a mix of diverse individuals from different countries who must be integrated into an effective project. Effective team building is one of the prime responsibilities of the project manager. When the project is supported by a funding, the integration and the implication of the different partners are quite easy. Particularly when partners are developing high-performing teams. However, management of research project requires further skills when the budget is not very high and/or when partners are from non-European countries and are not using the same vocabulary. The various cultures, values, beliefs and social usages, particularly with Mediterranean countries cause a special style of communication for an individual or group of individuals. This communication style participates in the success of the project and encompasses a lot of diplomatic skills which will be highlighted.

  5. Conceptualizing Knowledge Communication for Project Management

    DEFF Research Database (Denmark)

    Kampf, Constance Elizabeth

    2015-01-01

    In the field of project management, the search for better ways to manage projects is ongoing. One of the more recent trends in the literature focuses on the integration of knowledge management in project management environments. Advantages of integrating knowledge management into projects can be ...... knowledge for project management, this paper focuses on extending Knowledge Management to include concepts related to communicating knowledge from the fields of rhetoric, knowledge communication, and corporate communication....

  6. From risk management to uncertainty management: a significant change in project management

    Institute of Scientific and Technical Information of China (English)

    LI Gui-jun; ZHANG Yue-song

    2006-01-01

    Starting with the meanings of the terms "risk" and "uncertainty,"" he paper compares uncertainty management with risk management in project management. We bring some doubt to the use of "risk" and "uncertainty" interchangeably in project management and deem their scope, methods, responses, monitoring and controlling should be different too. Illustrations are given covering terminology, description, and treatment from different perspectives of uncertainty management and risk management. Furthermore, the paper retains that project risk management (PRM) processes might be modified to facilitate an uncertainty management perspective,and we support that project uncertainty management (PUM) can enlarge its contribution to improving project management performance, which will result in a significant change in emphasis compared with most risk management.

  7. Multidisplinary Engineering, Project, and Production Management

    Directory of Open Access Journals (Sweden)

    Chien-Ho Ko

    2012-01-01

    Full Text Available Journal of Engineering, Project, and Production Management (EPPM-Journal reflect the journal’s multidisciplinary approach to management research and can be categorized as belonging to three general topics: Project Management, Engineering and Project Management, and Project and Production Management.

  8. 7 CFR 3565.351 - Project management.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 15 2010-01-01 2010-01-01 false Project management. 3565.351 Section 3565.351... AGRICULTURE GUARANTEED RURAL RENTAL HOUSING PROGRAM Project Management § 3565.351 Project management. As a... Agency and complies with an approved management plan for the project. (b) Management plan. The lender...

  9. Multidisplinary Engineering, Project, and Production Management

    OpenAIRE

    Chien-Ho Ko

    2012-01-01

    Journal of Engineering, Project, and Production Management (EPPM-Journal) reflect the journal’s multidisciplinary approach to management research and can be categorized as belonging to three general topics: Project Management, Engineering and Project Management, and Project and Production Management.

  10. Performance management practices in public sector organizations : Impact on performance

    NARCIS (Netherlands)

    Verbeeten, Frank H.M.

    2008-01-01

    Purpose - The aim of this study is to investigate whether performance management practices affect performance in public sector organizations. Design/methodology/approach - Theoretically, the research project is based on economic as well as behavioral theories. The study distinguishes amongst

  11. Motivation, Management, and Performance.

    Science.gov (United States)

    Olmstead, Joseph A.

    There is an increasing interest today in the ways in which human motivation contributes to the productivity and performance of personnel. This early study of motivation management emphasizes that the organizational environment is a principal determinant of the quality of employee motivation. Concrete considerations in the management of motivation…

  12. Managing Learning for Performance.

    Science.gov (United States)

    Kuchinke, K. Peter

    1995-01-01

    Presents findings of organizational learning literature that could substantiate claims of learning organization proponents. Examines four learning processes and their contribution to performance-based learning management: knowledge acquisition, information distribution, information interpretation, and organizational memory. (SK)

  13. Finance and supply management project execution plan; TOPICAL

    International Nuclear Information System (INIS)

    BENNION, S.I.

    1999-01-01

    As a subproject of the HANDI 2000 project, the Finance and Supply Management system is intended to serve FDH and Project Hanford major subcontractor with financial processes including general ledger, project costing, budgeting, and accounts payable, and supply management process including purchasing, inventory and contracts management. Currently these functions are performed with numerous legacy information systems and suboptimized processes

  14. DIPLOMA PROJECT TEAM WORK MANAGEMENT

    Directory of Open Access Journals (Sweden)

    V. S. Kruglyk

    2014-04-01

    Full Text Available During the work performance students should get the maximal approach to the process of real project execution, so the project should include the need to use the latest technology, integration of data or services with different developments, architecture design, interaction of the team members and others. Implementation of graduation projects is the useful activity for the acquisition and consolidation of key IT competencies. Since the task of educational projects is maximal close to real one, students participate almost in all typical stages of commercial product’s development, and do so successfully. This is also confirmed practically: students, who were actively engaged in some projects at the university, have key positions in IT companies of the city and country after that. The main objective of the paper is to describe the organization of a common group students’ work on a degree project, implementation peculiarity of such projects, recommendations for improving the quality of projects. Thus, the paper is devoted to the peculiarities of the joint students’ work on a project during diploma execution in IT specialties, as the final part of the acquisition and consolidation process of key IT competencies of future programmers. The problem of choosing work topic, project concept, work organization in a group, implementation process organization has been considered. Also the specific stages of software development have been considered: development of interface, choice of technology, product quality, project disposal to the next developers, project completion.

  15. Project management at a university

    Science.gov (United States)

    Eaton, Joel A.

    2006-06-01

    Managing instrumentation projects, large or small, involves a number of common challenges-defining what is needed, desiging a system to provide it, producing it in an economical way, and putting it into service expeditiously. Doing these things in a university environoment provides unique challenges and opportunities not obtaining in the environment of large projects at NASA or national labs. I address this topic from the viewpoint of knowledge of two such projects, the development of OAO-2 at the University of Wisconsin and the relocation of Fairborn Observatory to the Patagonia Mountains in Arizona, as well as my own developemnt of the Tennessee State 2-m Automatic Spectroscopic Telescope. For the university environment, I argue for a more traditional management style that relies on more informal techniques than those used in large-scale projects conducted by big bureaucratic institutions. This style identifies what tasks are really necessary and eliminates as much wasteful overhead as possible. I discuss many of the formalities used in project management, such as formal reviews (PDR, CDR, etc.) and Gantt charts, and propose other ways of acheving the same results more effectively. The university environment acutely requires getting the right people to do the project, both in terms of their individual personalities, motivation, and technical skills but also in terms of their ability to get on with one another. Two critical challenges confronting those doing such projects in universities are 1) keeping the contractors on task (the major challenge to anyone doing project management) and 2) dealing with the purchasing systems in such institutions.

  16. Project management plan : Dallas Integrated Corridor Management (ICM) demonstration project.

    Science.gov (United States)

    2010-12-01

    The Dallas Integrated Corridor Management System Demonstration Project is a multi-agency, de-centralized operation which will utilize a set of regional systems to integrate the operations of the corridor. The purpose of the Dallas ICM System is to im...

  17. PROJECT MANAGEMENT AND RELATIONSHIP MARKETING: INTERSECTIONS FOR STAKEHOLDER MANAGEMENT IN PROJECTS

    Directory of Open Access Journals (Sweden)

    Ronielton Rezende Oliveira

    2017-06-01

    Full Text Available Projects development is essential for organizations. Among the factors originated in projects that influence performance is quality. This variable must be managed to meet the expectations of the stakeholders and this can only be achieved through effective monitoring and control. It can be seen that relationship marketing is relevant to the competitive reality of contemporary organizations. With the purpose of contributing to organizational studies, this theoretical essay proposes to approach project management in relationship marketing. In the context of integrated management, it is discussed how management action can be applied to engage and involve stakeholders in projects, in order to create value and achieve the expectations sustained by the execution of the projects. Based on the reflection, the quality of relationship management is pointed out as a construct of higher order, composed of at least two dimensions: trust and satisfaction.

  18. The application of project management in construction projects ...

    African Journals Online (AJOL)

    Project management is critical for successful project development. A crucial responsibility of the project manager is ensuring that the client is certified and the scope of work is of high quality, within the agreed budget and time frame. In some way, project financing is completed from the time of project conception. Indeed ...

  19. Benchmarking and Performance Management

    Directory of Open Access Journals (Sweden)

    Adrian TANTAU

    2010-12-01

    Full Text Available The relevance of the chosen topic is explained by the meaning of the firm efficiency concept - the firm efficiency means the revealed performance (how well the firm performs in the actual market environment given the basic characteristics of the firms and their markets that are expected to drive their profitability (firm size, market power etc.. This complex and relative performance could be due to such things as product innovation, management quality, work organization, some other factors can be a cause even if they are not directly observed by the researcher. The critical need for the management individuals/group to continuously improve their firm/company’s efficiency and effectiveness, the need for the managers to know which are the success factors and the competitiveness determinants determine consequently, what performance measures are most critical in determining their firm’s overall success. Benchmarking, when done properly, can accurately identify both successful companies and the underlying reasons for their success. Innovation and benchmarking firm level performance are critical interdependent activities. Firm level variables, used to infer performance, are often interdependent due to operational reasons. Hence, the managers need to take the dependencies among these variables into account when forecasting and benchmarking performance. This paper studies firm level performance using financial ratio and other type of profitability measures. It uses econometric models to describe and then propose a method to forecast and benchmark performance.

  20. Project Management with IT Security Focus

    OpenAIRE

    Felician Alecu; Paul Pocatilu; Sergiu Capisizu

    2011-01-01

    The paper focus on the main key points related to the IT security project management. The most important lifecycle stages are identified: IT security project proposal definition, project organization, project planning, quality planning, project team organization, IT security project activities management and project closing. The most important success factors for IT security projects are the support of top-management, customer satisfaction, prevention over remediation and continuous progress....

  1. Managing projects a team-based approach

    CERN Document Server

    Brown, Karen A

    2010-01-01

    Students today are likely to be assigned to project teams or to be project managers almost immediately in their first job. Managing Projects: A Team-Based Approach was written for a wide range of stakeholders, including project managers, project team members, support personnel, functional mangers who provide resources for projects, project customers (and customer representatives), project sponsors, project subcontractors, and anyone who plays a role in the project delivery process. The need for project management is on the rise as product life cycles compress, demand for IT systems increases, and business takes on an increasingly global character. This book adds to the project management knowledge base in a way that fills an unmet need—it shows how teams can apply many of the standard project management tools, as well as several tools that are relatively new to the field. Managing Projects: A Team-Based Approach offers the academic rigor found in most textbooks along with the practical attributes often foun...

  2. Project Leadership and Quality Performance of Construction Projects

    Directory of Open Access Journals (Sweden)

    SPG Buba

    2017-05-01

    Full Text Available Background: The construction industry in Nigeria, is pigeonholed by poor quality of construction products as a result of the inherent corruption in the country. Lack of purposeful leadership and inappropriate choice of leadership styles in the industry have been attributed to project failure. Abandoned and failed projects are more predominant in the public sector which litters every corner of the country. Objectives: The objective of this paper is to assess the impact of leadership styles on quality performance criteria of public projects in Nigeria. Methodology: A total of 43 questionnaires were distributed to 3 key groups of respondents (Quantity Surveyors, Builders, and Architects who are project managers in Nigeria. Descriptive and Inferential statistics were used to analyse the data using the Statistical Package for Social Sciences (SPSS. Likert Scale was used to measure the independent variables (leadership style: facilitative, coaching, delegating and directing; and the level of achievement of projects based on the dependent variables (quality and function performance criteria which are: achieving highest aesthetic quality; and functional building that fits its purpose. Findings: The study revealed that Directing is the major leadership style used by project managers in Nigeria. Amongst the leadership styles which has the most impact on quality performance indicators is also directing which has the most relative influence on achieving highest aesthetic quality and functional building that fits its purpose. Conclusion/Recommendation/Way forward: The underlying relationship between Directing leadership styles and the performance criteria of achieving highest aesthetic quality and functional building that fits its purpose will be beneficial to the Nigerian construction environment.

  3. How Project Managers Really Manage: An Indepth Look at Some Managers of Large, Complex NASA Projects

    Science.gov (United States)

    Mulenburg, Gerald M.; Impaeilla, Cliff (Technical Monitor)

    2000-01-01

    This paper reports on a research study by the author that examined ten contemporary National Aeronautics and Space Administration (NASA) complex projects. In-depth interviews with the project managers of these projects provided qualitative data about the inner workings of the project and the methodologies used in establishing and managing the projects. The inclusion of a variety of space, aeronautics, and ground based projects from several different NASA research centers helped to reduce potential bias in the findings toward any one type of project, or technical discipline. The findings address the participants and their individual approaches. The discussion includes possible implications for project managers of other large, complex, projects.

  4. Effects of Risk Management Practices on IT Project Success

    Directory of Open Access Journals (Sweden)

    Pimchangthong Daranee

    2017-03-01

    Full Text Available Successful management of an information technology (IT project is the most desirable for all organisations and stakeholders. Many researchers elaborated that risk management is a key part of project management for any project size. Risk management is so critical because it provides project managers with a forward-looking view of both threats and opportunities to improve the project success. The objectives of this research are to explore organisational factors affecting IT project success and risk management practices influencing IT project success. Risk management practices include risk identification, risk analysis, risk response planning, and risk monitoring and control. The IT project success is measured by process performance and product performance. Data are collected from 200 project managers, IT managers, and IT analysts in IT firms through questionnaires and analysed using Independent Sample t-test, One-way ANOVA, and Multiple Linear Regression at the statistical significance level of 0.05. The results show that the differences in organisational types affect IT project success in all aspects, while the differences on organisational sizes affect IT project success in the aspect of product performance and total aspects. Risk identification and risk response planning influence the process performance and the total aspects of IT project success. Risk identification has the highest positive influence on product performance, followed closely by risk response, while risk analysis negatively influences product performance.

  5. Decommissioning Project Manager's Implementing Instructions (PMII)

    International Nuclear Information System (INIS)

    Mihalic, M.A.

    1998-02-01

    Decommissioning Project personnel are responsible for complying with these PMII. If at any time in the performance of their duties a conflict between these instructions and other written or verbal direction is recognized or perceived, the supervisor or worker shall place his/her work place in a safe condition, stop work, and seek resolution of the conflict from the Decommissioning Project Manager or his designee

  6. Project management as steppingstone of enterprises

    OpenAIRE

    Andreeva, T.; Petrovska, T.; Tytar, T.

    2011-01-01

    Actual problems of project management in enterprises in order to achieve their goals. The basic members of the organization and implementation of project and the methodology for their implementation. The basic principles of project management are included.

  7. PROJECT MANAGEMENT CONSIDERED IN A 2014 PERSPECTIVE

    Directory of Open Access Journals (Sweden)

    GRAPĂ ADELINA-ROXANA

    2014-05-01

    Full Text Available Project Management has come of age, yet multiple surveys and reports confirm the fact that the majority of projects are challenged. Given the more demanding and strict financial constraints associated with the current fiscal climate, project management is regarded as a tool that can deliver more with less. The literature on Project Management shows that, in spite of advancement in Project Management processes, tools and systems, project success has not significantly improved. This problem raises questions about the value and effectiveness of Project Management and Project Management systems. Programs and projects are considered as strategic assets for the majority of businesses, therefore, the trend of these organizations is to embrace a management by projects culture. The main objective of Project Management nowadays is to ensure programs and projects aligned to a certain strategy and also to provide for every member of an organization the ability to take proactive actions creating additional benefits.

  8. Trojan Decommissioning Project Cost Performance

    International Nuclear Information System (INIS)

    Michael B. Lackey

    2000-01-01

    The Trojan nuclear plant (Trojan) was an 1160-MW(electric) four-loop pressurized water reactor located in Rainier, Oregon. The plant was permanently shut down in 1993 after ∼17 yr of commercial operation. The early plant closure was an economic decision. The key factors in the closure analysis were escalation of inspection and repair costs associated with steam generator tube cracking and the projected availability of inexpensive replacement power in the Pacific Northwest region of the United States. Since the plant closure, Portland General Electric (PGE) has been actively engaged in decommissioning. The Trojan Decommissioning Project currently has a forecast at completion of $429.7 million (all costs are in millions of 1997 dollars, unless otherwise noted). The cost performance of the Trojan Decommissioning Project to date is addressed, as well as the tools that are in place to provide cost control through completion of decommissioning

  9. 44 CFR 206.438 - Project management.

    Science.gov (United States)

    2010-10-01

    ... 44 Emergency Management and Assistance 1 2010-10-01 2010-10-01 false Project management. 206.438 Section 206.438 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT AGENCY, DEPARTMENT OF... Project management. (a) General. The State serving as grantee has primary responsibility for project...

  10. PROJECT MANAGEMENT CONSIDERED IN A 2014 PERSPECTIVE

    OpenAIRE

    GRAPA ADELINA-ROXANA; SOARE ALICE-MAGDALENA

    2014-01-01

    Project Management has come of age, yet multiple surveys and reports confirm the fact that the majority of projects are challenged. Given the more demanding and strict financial constraints associated with the current fiscal climate, project management is regarded as a tool that can deliver more with less. The literature on Project Management shows that, in spite of advancement in Project Management processes, tools and systems, project success has not significantly improved. T...

  11. Risk Management of NASA Projects

    Science.gov (United States)

    Sarper, Hueseyin

    1997-01-01

    Various NASA Langley Research Center and other center projects were attempted for analysis to obtain historical data comparing pre-phase A study and the final outcome for each project. This attempt, however, was abandoned once it became clear that very little documentation was available. Next, extensive literature search was conducted on the role of risk and reliability concepts in project management. Probabilistic risk assessment (PRA) techniques are being used with increasing regularity both in and outside of NASA. The value and the usage of PRA techniques were reviewed for large projects. It was found that both civilian and military branches of the space industry have traditionally refrained from using PRA, which was developed and expanded by nuclear industry. Although much has changed with the end of the cold war and the Challenger disaster, it was found that ingrained anti-PRA culture is hard to stop. Examples of skepticism against the use of risk management and assessment techniques were found both in the literature and in conversations with some technical staff. Program and project managers need to be convinced that the applicability and use of risk management and risk assessment techniques is much broader than just in the traditional safety-related areas of application. The time has come to begin to uniformly apply these techniques. The whole idea of risk-based system can maximize the 'return on investment' that the public demands. Also, it would be very useful if all project documents of NASA Langley Research Center, pre-phase A through final report, are carefully stored in a central repository preferably in electronic format.

  12. Measurement of software project management effectiveness

    OpenAIRE

    Demir, Kadir Alpaslan

    2008-01-01

    Approved for public release; distribution is unlimited. Evaluating, monitoring, and improving the effectiveness of project management can contribute to successful acquisition of software systems. In this dissertation, we introduce a quantitative metric for gauging the effectiveness of managing a software-development project. The metric may be used to evaluate and monitor project management effectiveness in software projects by project managers, technical managers, executive man...

  13. Future development of project management competences.

    NARCIS (Netherlands)

    Silvius, A.J.G.; Batenburg, R.

    2009-01-01

    This paper describes a study into the expected development of the competences of the project manager in the year 2027. The study was performed amongst the members of IPMA-Netherlands during the summer of 2007. In the study the 46 competences of the International Competence Baseline 3 (ICB 3) were

  14. Successful healthcare programs and projects: organization portfolio management essentials.

    Science.gov (United States)

    Pickens, Scott; Solak, Jamie

    2005-01-01

    Many healthcare organization projects take more time and resources than planned and fail to deliver desired business outcomes. Healthcare IT is a major component of many projects and often undeservedly receives the blame for failure. Poor results are often not a result of faulty healthcare IT or poor project management or poor project execution alone. Many projects fail because of poor portfolio management--poor planning and management of the portfolio of initiatives designed to meet an organization's strategic goals. Because resources are limited, portfolio management enables organizations to more strategically allocate and manage their resources so care delivery, service delivery, and initiatives that advance organizations toward their strategic goals, including healthcare IT initiatives, can be accomplished at the levels of quality and service desired by an organization. Proper portfolio management is the essential foundation for program and project success and supports overall organization success. Without portfolio management, even programs and projects that execute flawlessly may not meet desired objectives. This article discusses the essential requirements for porfolio management. These include opportunity identification, return on investment (ROI) forecast, project prioritization, capacity planning (inclusive of human, financial, capital, and facilities resources), work scheduling, program and project management and execution, and project performance and value assessment. Portfolio management is essential to successful healthcare project execution. Theories are drawn from the Organizational Project Management Maturity Model (OPM3) work of the Project Management Institute and other leading strategy, planning, and organization change management research institutes.

  15. Project management best practices: forging win-win partnerships and mitigating power project risk

    International Nuclear Information System (INIS)

    Trowsdale, R.

    2006-01-01

    This paper discusses aspects of project management to mitigate power project risk. end-to-end project development involves development phase, permitting phase, implementation phase, and operational phase. Each phase involves a number of different elements. In renewable energy project good management requires maintaining project discipline and schedule throughout all phases. Project success requires commercial competitiveness, fuel availability, power sales contracts, stake holder support, permitting, effective execution, construction and good technical performance

  16. Project Management Yinyang: Coupling project success and client satisfaction

    Directory of Open Access Journals (Sweden)

    Greg Stewart Usher

    2017-06-01

    Full Text Available Our research applies paradox theory to a project management construct to help project management researchers and practitioners understand the tensions that can exist between project success and client satisfaction. Our research highlights that although project success and client satisfaction are both present within a project management construct, they also belong to different functional systems. Project success and client satisfaction have different systemic-discourses and use different language games to convey information. These distinctions can create latent and sometimes salient tensions within the project management construct that project managers must understand, embrace, and work with. We have used a Grounded Theory (GT methodology to explore the lived experience of project managers, and from this have identified a phenomenon which we have termed project management yinyang. Project management yinyang is the state that exists when both project success and Client satisfaction are tightly coupled within the project management construct. Project management yinyang highlights that these two phenomena cannot be viewed as separate elements because the ‘seed’ of each exists within the other. And to truly achieve one, you must also achieve the other. Our findings indicate that in order to create project management yinyang the project manager must embrace a paradoxical yet holistic philosophy. They must understand the complementarity, interdependency, and structural coupling that exists between the positivist and interpretivist paradigms within the project management construct. They must understand how satisfaction (Yin and success (Yang are created through focus. Furthermore, they must understand how project management yinyang is separate from, but borne from, the convergence of the other two elements.

  17. Performance improvement through management audits

    International Nuclear Information System (INIS)

    Arter, D.R.

    1986-01-01

    We should go back to the basics of what a quality assurance program is designed to accomplish and then use that program to provide confidence to the public that actions are correct. The quality assurance management audit, if done responsible with trained people, is the best tool we have to monitor the goal of conducting business safely and correctly. Audit report should be used to project future performance and should not be used as a forum for recommendations. They should be presented in such a manner as to allow the managers involved to continually improve the work activity

  18. Project manager attributes influencing project success in the South ...

    African Journals Online (AJOL)

    success criteria for building projects in Ghana and concluded that the “current and ... qualifications, profession, leadership style and project team ... and expectations of project management competence between ... 1.d. Sense of teamwork ...

  19. Environmental Management Performance Report

    International Nuclear Information System (INIS)

    EDER, D.M.

    2002-01-01

    The purpose of this report is to provide the Department of Energy Richland Operations Office (RL) a monthly summary of the Central Plateau Contractor's Environmental Management (EM) performance by Fluor Hanford (FH) and its subcontractors. Only current FH workscope responsibilities are described and other contractor/RL managed work is excluded. Please refer to other sections (BHI, PNNL) for other contractor information. Section A, Executive Summary, provides an executive level summary of the cost, schedule, and technical performance described in this report. It summarizes performance for the period covered, highlights areas worthy of management attention, and provides a forward look to some of the upcoming key performance activities as extracted from the contractor baseline. The remaining sections provide detailed performance data relative to each individual subproject (e.g., Plutonium Finishing Plant, Spent Nuclear Fuels, etc.), in support of Section A of the report. All information is updated as of January 31, 2002 unless otherwise noted. ''Stoplight'' boxes are used to indicate at a glance the condition of a particular safety area. Green boxes denote either (1) the data are stable at a level representing ''acceptable'' performance, or (2) an improving trend exists. Yellows denote the data are stable at a level from which improvement is needed. Red denotes a trend exists in a non-improving direction

  20. Environmental Management Performance Report

    International Nuclear Information System (INIS)

    EDER, D.M.

    2002-01-01

    The purpose of this report is to provide the Department of Energy Richland Operations Office (RL) a monthly summary of the Central Plateau Contractor's Environmental Management (EM) performance by Fluor Hanford (FH) and its subcontractors. Only current FH workscope responsibilities are described and other contractor/RL managed work is excluded. Please refer to other sections (BHI, PNNL) for other contractor information. Section A, Executive Summary, provides an executive level summary of the cost, schedule, and technical performance described in this report. It summarizes performance for the period covered, highlights areas worthy of management attention, and provides a forward look to some of the upcoming key performance activities as extracted from the contractor baseline. The remaining sections provide detailed performance data relative to each individual subproject (e.g., Plutonium Finishing Plant, Spent Nuclear Fuels, etc.), in support of Section A of the report. All information is updated as of the end of May 2002 unless otherwise noted. ''Stoplight'' boxes are used to indicate at a glance the condition of a particular safety area. Green boxes denote either (1) the data are stable at a level representing ''acceptable'' performance, or (2) an improving trend exists. Yellows denote the data are stable at a level from which improvement is needed. Red denotes a trend exists in a non-improving direction

  1. Breakthrough Propulsion Physics Project: Project Management Methods

    Science.gov (United States)

    Millis, Marc G.

    2004-01-01

    To leap past the limitations of existing propulsion, the NASA Breakthrough Propulsion Physics (BPP) Project seeks further advancements in physics from which new propulsion methods can eventually be derived. Three visionary breakthroughs are sought: (1) propulsion that requires no propellant, (2) propulsion that circumvents existing speed limits, and (3) breakthrough methods of energy production to power such devices. Because these propulsion goals are presumably far from fruition, a special emphasis is to identify credible research that will make measurable progress toward these goals in the near-term. The management techniques to address this challenge are presented, with a special emphasis on the process used to review, prioritize, and select research tasks. This selection process includes these key features: (a) research tasks are constrained to only address the immediate unknowns, curious effects or critical issues, (b) reliability of assertions is more important than the implications of the assertions, which includes the practice where the reviewers judge credibility rather than feasibility, and (c) total scores are obtained by multiplying the criteria scores rather than by adding. Lessons learned and revisions planned are discussed.

  2. Management and human performance

    International Nuclear Information System (INIS)

    Russell, W.T.

    1988-01-01

    Past human performance and management problems have been well documented. The accidents at Three Mile Island and Chernobyl have significant root causes in human factors and in plant management. The failure of plant personnel to recognize the safety significance of their actions, procedures which were knowingly violated, a lack of awareness of plant conditions and status, and operators being misled by incorrect data and information were root causes of these accidents. Safety culture starts with personal dedication and accountability beginning at the top with senior corporate management. It is formed by policies and administrative controls which when implemented ensure that correct practices are followed. Senior management fosters an attitude and safety consciousness in all personnel with responsibility for supervision, operation and maintenance of the nuclear power plant

  3. A framework to improve performance measurement in engineering projects

    OpenAIRE

    Zheng , Li; Baron , Claude; Esteban , Philippe; Xue , Rui; Zhang , Qiang

    2017-01-01

    International audience; A wide range of methods and good practices have been developed for the measurement of projects performance. They help project managers to effectively monitor the project progress and evaluate results. However, from a literature review, we noticed several remaining critical issues in measuring projects performance, such as an unbalanced development of Key Performance Indicators types between lagging and leading indicators. On the other hand, systems engineering measurem...

  4. Evolution of project management research: a bibliometric study of International Journal of Project Management

    Directory of Open Access Journals (Sweden)

    Fábio Cocchi da Silva Eiras

    2017-03-01

    Full Text Available Over the past decades, the project management field has evolved and consolidated. Facing this growth, this research aims to identify the main trends of research in the area, as well as providing an overview of publications, identifying new issues, changes in approaches and the development of knowledge areas. To do so, a systematic review of the literature was performed with the use of bibliometric study in the papers of the International Journal of Project Management (IJPM, included in SCOPUS, from its first volume to 2015, covering a period of more than 30 years. It was found that developing countries are increasingly concerned in developing research into the field of project management, especially in mega infrastructure projects and public-private partnerships. The risk is a central topic in all periods of analysis, however, the strategic topics such as success in project and portfolio management are among the fastest growing. Issues related to the soft side of project management as skills, culture, and knowledge management have emerged in recent periods. According to the industry, construction projects and projects in information technology are the most studied along the period analysed.

  5. Project planning and project management of Baseball II-T

    International Nuclear Information System (INIS)

    Kozman, T.A.; Chargin, A.K.

    1975-01-01

    The details of the project planning and project management work done on the Baseball II-T experiment are reviewed. The LLL Baseball program is a plasma confinement experiment accomplished with a superconducting magnet in the shape of a baseball seam. Both project planning and project management made use of the Critical Path Management (CPM) computer code. The computer code, input, and results from the project planning and project management runs, and the cost and effectiveness of this method of systems planning are discussed

  6. [The research project: financing and management].

    Science.gov (United States)

    Schena, F P

    2003-01-01

    Basic and clinical research is accomplished by projects. The design of a project is not only based on the scientific content but also on its financing and management. This article wants to illustrate the correct modalities for project financing and project management in a scientific project.

  7. Project management v praxi

    OpenAIRE

    Králová, Eliška

    2013-01-01

    Project management approaches are commonly used to write and implement business plans. In this thesis standard project management tools and methods are applied to a real project, which aims to improve the properties of the product it offers (an online educational game). This project is unique in that it is based on a voluntary basis, has limited resources and is very responsive to market demands. Project management is broken down into four stages according to the project life cycle: initiatio...

  8. Managing MDO Software Development Projects

    Science.gov (United States)

    Townsend, J. C.; Salas, A. O.

    2002-01-01

    Over the past decade, the NASA Langley Research Center developed a series of 'grand challenge' applications demonstrating the use of parallel and distributed computation and multidisciplinary design optimization. All but the last of these applications were focused on the high-speed civil transport vehicle; the final application focused on reusable launch vehicles. Teams of discipline experts developed these multidisciplinary applications by integrating legacy engineering analysis codes. As teams became larger and the application development became more complex with increasing levels of fidelity and numbers of disciplines, the need for applying software engineering practices became evident. This paper briefly introduces the application projects and then describes the approaches taken in project management and software engineering for each project; lessons learned are highlighted.

  9. Project report - an overview of the project and experiences with project management

    DEFF Research Database (Denmark)

    Jørgensen, Michael Søgaard; Mikkelsen, Bent Egberg

    1996-01-01

    A collection of the project planning and the experiences with project management from the Catering 2000 project.As appendieces articles etc. from journals, newspapers etc. about the project.......A collection of the project planning and the experiences with project management from the Catering 2000 project.As appendieces articles etc. from journals, newspapers etc. about the project....

  10. Project management competency factors in the built environment

    OpenAIRE

    2013-01-01

    M.Comm. (Business Management) Project failures worldwide are still significantly high, despite the availability of project management frameworks, standards, techniques and methodologies. A project’s success is, in part, contingent on effectively managing the constraints of time, costs and performance, and in order to achieve this, it is essential for the project manager to possess and display appropriate competencies. The problem addressed in this study is to gain understanding of the proj...

  11. Essentials of Project and Systems Engineering Management

    CERN Document Server

    Eisner, Howard S

    2008-01-01

    The Third Edition of Essentials of Project and Systems Engineering Management enables readers to manage the design, development, and engineering of systems effectively and efficiently. The book both defines and describes the essentials of project and systems engineering management and, moreover, shows the critical relationship and interconnection between project management and systems engineering. The author's comprehensive presentation has proven successful in enabling both engineers and project managers to understand their roles, collaborate, and quickly grasp and apply all the basic princip

  12. I-15 integrated corridor management system : project management plan.

    Science.gov (United States)

    2011-06-01

    The Project Management Plan (PMP) assists the San Diego ICM Team by defining a procedural framework for : management and control of the I-15 Integrated Corridor Management Demonstration Project, and development and : deployment of the ICM System. The...

  13. Managing human performance

    International Nuclear Information System (INIS)

    Strucic, M.; Kavsek, D.

    2004-01-01

    Human performance remains a significant factor for management attention not only from a reactor safety perspective, but also from a financial one. Recent significant events analysis shows that human errors are still dominant causes and contributors to them. An analysis of significant events in nuclear industry occurred through 15-years period revealed that three of four significant events were triggered by human error, although the number of events have dropped by more than a factor of four. A number of human performance breakdowns occurred in the application of errorprevention techniques. These included a lack of pre-job briefs, inadequate turnover of tasks, ineffective use of peer checking, inadequate procedure adherence, and failure to apply a questioning attitude when unexpected changes were encountered in the task. Attempts by the industry to improve human performance have traditionally focused at the worker level. However, human error occurs within the context of the organization, which can either foster or resist human error. The greatest room for improvement lies not only in the continued improvement of front-line worker performance but more so in the identification and elimination of weaknesses in the organizational and managerial domains that contributes to worker performance at the job site. Based on mentioned analysis, other industrial sources and own operating experience, NPP Krsko is paying more attention to improve human performance among own as well as contractor workers. Through series of programs and activities, such as Reactivity Management Program, Safety Culture Program, Self-assessment Program, Corrective Action Program, Plant Performance Monitoring Program, developed in last few years, and through new procedures, written guides and publications, training and management efforts, number of human errors is going to be reduced. Involvement of higher levels of NPP Krsko organization in promotion and use of Human Performance techniques is

  14. Impacto dos modelos de referência e maturidade no gerenciamento de projetos: estudo exploratório em projetos de tecnologia da informação Impact of project management reference and project management maturity models on performance: an exploratory study in information technology projects

    Directory of Open Access Journals (Sweden)

    Fernando Tobal Berssaneti

    2012-08-01

    Full Text Available Modelos de maturidade e modelos de referência em gerenciamento de projetos têm sido implantados de forma crescente na área de tecnologia da informação (TI. Este artigo tem por objetivo analisar o impacto do grau de maturidade organizacional em gerenciamento de projetos e o da adoção de modelos de referência no sucesso de projetos de TI. Foi adotada a abordagem de pesquisa quantitativa, com levantamento junto a 51 profissionais da área. Os resultados apontam para correlação positiva entre o grau de maturidade organizacional em gerenciamento de projetos e a satisfação das demandas dos stakeholders (principais interessados no projeto. Também foi constatada relação estatística positiva entre a adoção do PMBoK e o sucesso de projetos de TI, no que concerne ao atendimento dos requisitos e satisfação das demandas dos stakeholders.Project management maturity and project management reference models have been widely adopted on information technology (IT companies. This article aims to analyze the impact of project management maturity level and adopt reference models on IT projects performance (success. A quantitative research approach was used, including a survey with 51 professionals from the sector. Results showed positive impact between project management maturity level and meeting of stakeholders' demands. A positive statistical correlation was also found in firms that develop information technology projects through PMBoK adoption concerning meeting requirements and meeting of stakeholders' demands.

  15. AVLIS Production Plant Project Management Plan

    International Nuclear Information System (INIS)

    1984-01-01

    The AVLIS Production Plant is designated as a Major System Acquisition (in accordance with DOE Order 4240.IC) to deploy Atomic Vapor Laser Isotope Separation (AVLIS) technology at the Oak Ridge, Tennessee site, in support of the US Uranium Enrichment Program. The AVLIS Production Plant Project will deploy AVLIS technology by performing the design, construction, and startup of a production plant that will meet capacity production requirements of the Uranium Enrichment Program. The AVLIS Production Plant Project Management Plan has been developed to outline plans, baselines, and control systems to be employed in managing the AVLIS Production Plant Project and to define the roles and responsibilities of project participants. Participants will develop and maintain detailed procedures for implementing the management and control systems in agreement with this plan. This baseline document defines the system that measures work performed and costs incurred. This plan was developed by the AVLIS Production Plant Project staff of Martin Marietta Energy Systems, Inc. and Lawrence Livermore National Laboratory in accordance with applicable DOE directives, orders and notices. 38 figures, 19 tables

  16. Complexities in innovation management in companies from the European industry. A path model of innovation project performance determinants

    NARCIS (Netherlands)

    Tepic, M.; Kemp, R.G.M.; Omta, S.W.F.; Fortuin, F.T.J.M.

    2013-01-01

    Purpose – The purpose of this paper is to provide an integrated framework of complex relations among innovation characteristics, organizational capabilities, innovation potential and innovation performance. Design/methodology/approach – The model is tested using partial least squares (PLS) modeling

  17. Managing for Results in America's Great City Schools. A Report of the Performance Measurement and Benchmarking Project, Spring 2008

    Science.gov (United States)

    Council of the Great City Schools, 2008

    2008-01-01

    This report describes statistical indicators developed by the Council of the Great City Schools and its member districts to measure big-city school performance on a range of operational functions in business, finance, human resources and technology. The report also presents data city-by-city on those indicators. This is the second time that…

  18. Managing for Results in America's Great City Schools. A Report of the Performance Measurement and Benchmarking Project

    Science.gov (United States)

    Council of the Great City Schools, 2008

    2008-01-01

    This report describes statistical indicators developed by the Council of the Great City Schools and its member districts to measure big-city school performance on a range of operational functions in business, finance, human resources and technology. The report also presents data city-by-city on those indicators. This is the second time that…

  19. Examination of the relationship between project management critical success factors and project success of oil and gas drilling projects

    Science.gov (United States)

    Alagba, Tonye J.

    and gas drilling projects could help oil companies improve the performance of future drilling projects. Theoretically, the study's findings may help to bridge a gap in the project management CSFs literature, and add to the general project management body of knowledge.

  20. MARKETING PERFORMANCE MANAGEMENT

    OpenAIRE

    Gacsi, Roland; Zeman, Zoltan

    2013-01-01

    In recent years, it has become essential for business managers to have new ways of thinking in order to sustain performance and growth. There is an increased intensification of market competition. This tough “fight” to win customers resulted that marketing has an ever increasing place in businesses’ strategic and operational activities. Marketing is not quite understood at many companies which often rest upon the fact that it has been one of the least measurable function in a business. Theref...

  1. 40 CFR 35.2218 - Project performance.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Project performance. 35.2218 Section 35... STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2218 Project performance. (a... personnel; and (3) Advise the grantee whether the project is meeting the project performance standards. (c...

  2. A Statistical Project Control Tool for Engineering Managers

    Science.gov (United States)

    Bauch, Garland T.

    2001-01-01

    This slide presentation reviews the use of a Statistical Project Control Tool (SPCT) for managing engineering projects. A literature review pointed to a definition of project success, (i.e., A project is successful when the cost, schedule, technical performance, and quality satisfy the customer.) The literature review also pointed to project success factors, and traditional project control tools, and performance measures that are detailed in the report. The essential problem is that with resources becoming more limited, and an increasing number or projects, project failure is increasing, there is a limitation of existing methods and systematic methods are required. The objective of the work is to provide a new statistical project control tool for project managers. Graphs using the SPCT method plotting results of 3 successful projects and 3 failed projects are reviewed, with success and failure being defined by the owner.

  3. The Kozloduy project management unit

    International Nuclear Information System (INIS)

    Carnes, W.S.; Gros-Gean, P.; Demireva, E.

    2004-01-01

    The Project Management Unit (PMU) has been established in support to the Kozloduy NPP decommissioning department. It is comprised of a Consortium of the British Nuclear Group, EDF and subcontractor ENPRO Consult. It is responsible for the management of seven projects (a facility for dry storage of spent fuel; equipment to treat low activity liquid radioactive waste; provision of physical separation of the plant systems and areas to be decommissioned from the ones in operation; equipment to decontaminate and clean pools and large tanks; a facility to provide high volume reduction of solid radioactive wastes and retrieval and conditioning of ion exchange resins and other sorbents; equipment to provide measurement for the free-release of materials and components; a facility for personnel monitoring, decontamination and clothes changing for work outside of the normal radiological control areas) that will be used in support of the KNPP decommissioning process. The projects will be tendered in compliance with the European Bank for Reconstruction and Development requirements

  4. Integrated Project Teams - An Essential Element of Project Management during Project Planning and Execution - 12155

    Energy Technology Data Exchange (ETDEWEB)

    Burritt, James G.; Berkey, Edgar [Longenecker and Associates, Las Vegas, NV 89135 (United States)

    2012-07-01

    Managing complex projects requires a capable, effective project manager to be in place, who is assisted by a team of competent assistants in various relevant disciplines. This team of assistants is known as the Integrated Project Team (IPT). he IPT is composed of a multidisciplinary group of people who are collectively responsible for delivering a defined project outcome and who plan, execute, and implement over the entire life-cycle of a project, which can be a facility being constructed or a system being acquired. An ideal IPT includes empowered representatives from all functional areas involved with a project-such as engineering design, technology, manufacturing, test and evaluation, contracts, legal, logistics, and especially, the customer. Effective IPTs are an essential element of scope, cost, and schedule control for any complex, large construction project, whether funded by DOE or another organization. By recently assessing a number of major, on-going DOE waste management projects, the characteristics of high performing IPTs have been defined as well as the reasons for potential IPT failure. Project managers should use IPTs to plan and execute projects, but the IPTs must be properly constituted and the members capable and empowered. For them to be effective, the project manager must select the right team, and provide them with the training and guidance for them to be effective. IPT members must treat their IPT assignment as a primary duty, not some ancillary function. All team members must have an understanding of the factors associated with successful IPTs, and the reasons that some IPTs fail. Integrated Project Teams should be used by both government and industry. (authors)

  5. Project Management Communication 2.0

    DEFF Research Database (Denmark)

    Berggreen, Line; Kampf, Constance Elizabeth

    2015-01-01

    How can we understand project management communication practices for developing effective practices in professional and technical communication? In this article we explore an approach to project management that focuses on projects as having a technical documentation structure with content...... that is developed through social or interpersonal communication practices. Looking at the broader picture of project management which besides the implementation phase also includes conception, planning and closure, we see a project management framework that brings together both technical and social aspects...... of project communication. To understand how this works, we interviewed project managers about their understanding and strategy in communicating about the projects they lead. Findings demonstrate that more experienced project managers have a more nuanced understanding of project communication as both...

  6. Project Management – Multi-perspective Leadership

    DEFF Research Database (Denmark)

    Riis, Eva

    2014-01-01

    Project Management – Multi-perspective Leadership” af Hans Mikkelsen og Jens Ove Riis - anmeldelse......”Project Management – Multi-perspective Leadership” af Hans Mikkelsen og Jens Ove Riis - anmeldelse...

  7. Project management in the library workplace

    CERN Document Server

    Daugherty, Alice

    2018-01-01

    This volume of Advances in Library Administration and Organization attempts to put project management into the toolboxes of library administrators through overviews of concepts, analyses of experiences, and forecasts for the use of project management within the profession.

  8. Risk management in product innovation projects

    NARCIS (Netherlands)

    Halman, J.I.M.; Keizer, J.A.

    1993-01-01

    In product innovation projects risk management has become increasingly important. Technological and commercial developments ask for effective and efficient product innovation. Systematic diagnosing and management of risks can help to make product innovation projects successful. In this paper a

  9. A proposed model for construction project management ...

    African Journals Online (AJOL)

    Keywords: Communication skills and leadership model, construction project ..... help a manager handle stress and break tension (Gido & Clements,. 2012: 331; Harrin .... production and management of projects, the higher the demand for.

  10. Project management in practice : Evaluating a case project through project management theories

    OpenAIRE

    Uusitalo, Jenni

    2013-01-01

    The purpose of this thesis was to evaluate a case project and to study whether it was carried out in a correct manner; meaning that did the case project follow the project management models. In addition, part of the study was to determine what could have been improved in the management of the case project. The case project was about creating and launching a communication channel based on a social media service, on a blog platform called Tumblr, for Team Finland in Spain network. The network p...

  11. Project management. A discipline which contributes to project success

    International Nuclear Information System (INIS)

    Hoch, G.

    2008-01-01

    The presentation covers the following topics: description of the Project - a contract was signed between KNPP and European Consortium Kozloduy (ECK) consisting of Framatome ANP GmbH as Leader (63%), Framatome ANP S.A.S. (17%), Atomenergoexport (20%) ; Project management in the modernization of NPP Kozloduy units 5 and 6; Project management process within AREVA NP GmbH; current status

  12. The Little Black Book of Project Management

    CERN Document Server

    Thomsett, Michael C

    2009-01-01

    For nearly twenty years, The Little Black Book of Project Management has provided businesspeople everywhere with a quick and effective introduction to project management tools and methodology. The revised and updated third edition reflects the newest techniques, the latest project management software, as well as the most recent changes to the Project Management Body of Knowledge (PMBOK™). Readers will find invaluable strategies for: • Organizing any project • Choosing the project team • Preparing a budget and sticking to it • Scheduling, flowcharting, and controlling a project • Preparing proj

  13. Managing dualities in organizational change projects

    OpenAIRE

    Shaw, David

    2016-01-01

    When managers want to change their organisation they often set up a project to do it, in the belief that doing so simplifies and focuses the change initiative and brings greater assurance of success. Case studies of three organisational change projects undertaken by Arts Council England during 2006-2007 are used to examine the notion of project management and change management as a duality. It is argued that the structured, systematic approach associated with project management needs to be ba...

  14. Spent Nuclear Fuel Project Safety Management Plan

    International Nuclear Information System (INIS)

    Garvin, L.J.

    1996-02-01

    The Spent Nuclear Fuel Project Safety Management Plan describes the new nuclear facility regulatory requirements basis for the Spemt Nuclear Fuel (SNF) Project and establishes the plan to achieve compliance with this basis at the new SNF Project facilities

  15. Development of funding project risk management tools.

    Science.gov (United States)

    2013-11-01

    Funding project risk management is a process for identifying, assessing, and prioritizing project funding risks. To plan to : minimize or eliminate the impact of negative events, one must identify what projects have higher risk to respond to potentia...

  16. Process-based project proposal risk management

    Directory of Open Access Journals (Sweden)

    Alok Kumar

    2016-12-01

    Full Text Available We all are aware of the organizational omnipresence. Projects within the organizations are ubiquitous too. Projects achieve their goals successfully if they are planned, scheduled, controlled and implemented well. The project lifecycle of initiating, planning, scheduling, controlling and implementing are very well-planned by project managers and the organizations. Successful projects have well-developed risk management plans to deal with situations impacting projects. Like any other organisation, a university does try to access funds for different purposes too. For such organisations, running a project is not the issue, rather getting a project proposal approved to fund a project is the key. Project proposal processing is done by the nodal office in every organisation. Usually, these nodal offices help in administration and submission of a project proposal for accessing funds. Seldom are these nodal project offices within the organizations facilitate a project proposal approval by proactively reaching out to the project managers. And as project managers prepare project proposals, little or no attention is made to prepare a project proposal risk plan so as to maximise project acquisition. Risk plans are submitted while preparing proposals but these risk plans cater to a requirement to address actual projects upon approval. Hence, a risk management plan for project proposal is either missing or very little effort is made to treat the risks inherent in project acquisition. This paper is an integral attempt to highlight the importance of risk treatment for project proposal stage as an extremely important step to preparing the risk management plan made for projects corresponding to their lifecycle phases. Several tools and techniques have been proposed in the paper to help and guide either the project owner (proposer or the main organisational unit responsible for project management. Development of tools and techniques to further enhance project

  17. University Performance Management

    DEFF Research Database (Denmark)

    For the last two decades the Danish Universities have felt the impact of the international trend towards implementation of New Public Management. The results are seen in the implementation of new hierarchical governance structures and contractual governance system including market based quantitat......For the last two decades the Danish Universities have felt the impact of the international trend towards implementation of New Public Management. The results are seen in the implementation of new hierarchical governance structures and contractual governance system including market based...... quantitative measurement systems for resource allocation and performance evaluation. Compared to other countries the changes in performance measurements and governance of the Danish universities are radical and the Minister of Science heralded them as "the greatest change in university management since...... the founding of Copenhagen University in 1479". The changes took place with surprisingly little resistance from university scholars. The articles in this anthology investigate the origins and rationales for the silent managerial revolution at Danish Universities and the radical implications for the identity...

  18. 76 FR 67400 - Capital Project Management

    Science.gov (United States)

    2011-11-01

    ...-0030] RIN 2132-AA92 Capital Project Management AGENCY: Federal Transit Administration (FTA), DOT... extending the comment period on its proposed rule for Capital Project Management to December 2, 2011, to...) proposing to transform the current FTA rule for project management oversight into a discrete set of...

  19. 76 FR 56363 - Capital Project Management

    Science.gov (United States)

    2011-09-13

    ...-0030] RIN 2132-AA92 Capital Project Management AGENCY: Federal Transit Administration (FTA), DOT... current FTA rule for project management oversight into a discrete set of managerial principles for sponsors of major capital projects; enable FTA to more clearly identify the necessary management capacity...

  20. 78 FR 16460 - Capital Project Management

    Science.gov (United States)

    2013-03-15

    ...-0030] RIN 2132-AA92 Capital Project Management AGENCY: Federal Transit Administration (FTA), DOT... withdrawing its September 13, 2011, Notice of Proposed Rulemaking to revise the agency's project management... will reinitiate a rulemaking for project management oversight in the near future. Additionally, FTA may...

  1. The evolution of the project management

    Directory of Open Access Journals (Sweden)

    Catalin Drob

    2009-12-01

    Full Text Available Project management has appeared and developed based on scientific management theory during the '50s-'60s of the last century. After the 1990s of the last century, we can say that project management has truly become an independent discipline, which has a huge impact on the success or failure of companies which are engaged in major projects.

  2. Project materials [Commercial High Performance Buildings Project

    Energy Technology Data Exchange (ETDEWEB)

    None

    2001-01-01

    The Consortium for High Performance Buildings (ChiPB) is an outgrowth of DOE'S Commercial Whole Buildings Roadmapping initiatives. It is a team-driven public/private partnership that seeks to enable and demonstrate the benefit of buildings that are designed, built and operated to be energy efficient, environmentally sustainable, superior quality, and cost effective.

  3. Software Support for the Classical, Contemporary and Future Project Management

    Directory of Open Access Journals (Sweden)

    Jakov Crnkovic

    2006-04-01

    Full Text Available The volume and complexity of Project Management (PM raises many questions for managers. What exactly are we managing? People? Performance? Efficiency? Effectiveness? Cost? Time? At what levels do projects become challenging and worthy of significant management attention? Can some projects be left on auto-pilot? Must others be managed more aggressively? What metrics are useful in Project Management? How can they be integrated with normal performance metrics in the organization? How can metrics be built into assessment programs that work? How can projects be monitored, re-planned to stay within the original budget and schedule deadlines? How good is the PM software support? Do we really need PM software packages or it should be the integral part of the company's information system (IS? Where is the knowledge about company's previous projects and performance? Are we able to establish company or even industry wide standards for project management? Can we (or should we move from the PMBOK® guidelines and use other approaches? We discussing important questions in PM: software products, responsibilities for concurrently executing several projects (multi-projects with multi objectives and multiple deadlines, introducing a need for initiation, design, execution, and control using a virtual project management and application of the organizational project maturity model.

  4. IX Disposition Project - project management plan

    International Nuclear Information System (INIS)

    Choi, I.G.

    1994-01-01

    This report presents plans for resolving saving and disposal concerns for ion exchange modules, cartridge filters and columns. This plan also documents the project baselines for schedules, cost, and technical information

  5. Female Project Managers' Workplace Problems: a Survey

    Science.gov (United States)

    Duong, Thuong Thi; Skitmore, Martin

    This article examines the extent to which challenges in the workplace may cause female project managers to be in a significantly small minority. A survey of members of the Australian Institute of Project Management in Queensland is described. This compares the experiences and observations of both men and women on various issues related to technical and gender aspects in project management workplaces. The results show that although female project managers experience many problems, male project managers also experience most of the same problems. Likewise, there are also few differences between more and less experience, the level of management, and types of industries. The differences that do occur involve discrimination against women in general, differences in project management styles, and support from other project managers.

  6. Combining AHP and DEA Methods for Selecting a Project Manager

    Directory of Open Access Journals (Sweden)

    Baruch Keren

    2014-07-01

    Full Text Available A project manager has a major influence on the success or failure of the project. A good project manager can match between the strategy and objectives of the organization and the goals of the project. Therefore, the selection of the appropriate project manager is a key factor for the success of the project. A potential project manager is judged by his or her proven performance and personal qualifications. This paper proposes a method to calculate the weighted scores and the full rank of candidates for managing a project, and to select the best of those candidates. The proposed method combines specific methodologies: the Data Envelopment Analysis (DEA and the Analytical Hierarchical Process (AHP and uses DEA Ranking Methods to enhance selection.

  7. Integrated project risk management of nuclear power projects

    International Nuclear Information System (INIS)

    Wang Xiaohui; Xu Yuanhui

    2001-01-01

    The concept and the features of risks in nuclear power projects are introduced, and in terms of nuclear power projects' own features, the Nuclear Power Project Integrated Risk Management Model is presented. The identification, estimation, evaluation, response plan development, control of risks and the theoretical basis of risk management are discussed. The model has feedback and control functions in order to control and manage the risks dynamically

  8. 97 Things Every Project Manager Should Know

    CERN Document Server

    Davis, Barbee

    2009-01-01

    If the projects you manage don't go as smoothly as you'd like, 97 Things Every Project Manager Should Know offers knowledge that's priceless, gained through years of trial and error. This illuminating book contains 97 short and extremely practical tips -- whether you're dealing with software or non-IT projects -- from some of the world's most experienced project managers and software developers. You'll learn how these professionals have dealt with everything from managing teams to handling project stakeholders to runaway meetings and more. While this book highlights software projects, its w

  9. TERMINOLOGY MANAGEMENT FRAMEWORK DEVIATIONS IN PROJECTS

    Directory of Open Access Journals (Sweden)

    Олена Борисівна ДАНЧЕНКО

    2015-05-01

    Full Text Available The article reviews new approaches to managing projects deviations (risks, changes, problems. By offering integrated control these parameters of the project and by analogy with medical terminological systems building a new system for managing terminological variations in the projects. With an improved method of triads system definitions are analyzed medical terms that make up terminological basis. Using the method of analogy proposed new definitions for managing deviations in projects. By using triad integrity built a new system triad in project management, which will subsequently also analogous to develop a new methodology of deviations in projects.

  10. Transportation engineering project management : survey of practice.

    Science.gov (United States)

    2017-01-01

    Utah Department of Transportation (UDOT) project managers (PMs) have identified inefficiencies in the legacy : system electronic Program Management (ePM) used to manage consultant contracts and invoices. To help UDOT : prepare for potential system im...

  11. Project Management Plan (PMP) for Work Management Implementation

    International Nuclear Information System (INIS)

    SHIPLER, C.E.

    2000-01-01

    The purpose of this document is to provide a project plan for Work Management Implementation by the River Protection Project (RPP). Work Management is an information initiative to implement industry best practices by replacing some Tank Farm legacy system

  12. Apply Lean Thinking in Project Management

    OpenAIRE

    Pham Ngoc, Lan

    2015-01-01

    The purpose of this thesis was to study the effects of Lean Thinking in Project Management and how applying Lean Project Management could enhance the productivity of project work. The study was carried using theoretical research and collecting empirical data from three interviews and one case study at a local company. At the end of the study, the major project management problems at the company were identified and analyzed following Lean Principles. It was also pointed out where there...

  13. Performance of core exit thermocouple for PWR accident management action in vessel top break LOCA simulation experiment at OECD/NEA ROSA project

    International Nuclear Information System (INIS)

    Suzuki, Mitsuhiro; Takeda, Takeshi; Nakamura, Hideo

    2009-01-01

    Presented are experiment results of the Large Scale Test Facility (LSTF) conducted at the Japan Atomic Energy Agency (JAEA) with a focus on core exit thermocouple (CET) performance to detect core overheat during a vessel top break loss-of-coolant accident (LOCA) simulation experiment. The CET temperatures are used to start accident management (AM) action to quickly depressurize steam generator (SG) secondary side in case of core temperature excursion. Test 6-1 is first test of the OECD/NEA ROSA Project started in 2005, simulating withdraw of a control rod drive mechanism penetration nozzle at the vessel top head. The break size is equivalent to 1.9% cold leg break. The AM action was initiated when CET temperature rose up to 623K. There was no reflux water fallback onto the CETs during the core heat-up period. The core overheat, however, was detected with a time delay of about 230s. In addition, a large temperature discrepancy was observed between the CETs and the hottest core region. This paper clarifies the reason of time delay and temperature discrepancy between the CETs and heated core during boil-off including three-dimensional steam flows in the core and core exit. The paper discusses applicability of the LSTF CET performance to pressurized water reactor (PWR) conditions and a possibility of alternative indicators for earlier AM action than in Test 6-1 is studied by using symptom-based plant parameters such as a reactor vessel water level detection. (author)

  14. Modern project management theory and knowledge framework

    Institute of Scientific and Technical Information of China (English)

    Luo Zhongbao

    2014-01-01

    The scholars increasingly pay at ention to the internal rules in knowledge development and innovation of construction engineering management,as wel as the framework for engineering management body of knowledge. Considering the one-of-a-kind characteristic of construction project s and highly dependence from projects on management knowledge and its innovation,this paper analyzed the knowledge body of engineering management and its development dimension ,such as thinking and knowledge structure dimensions. The engineering management knowledge innovation model and structural model were put forward. The paper reviewed and proposed the engineering management knowledge system framework under engineering thinking mode,including the basic knowledge system framework which is used in engineering management research ,and a framework for body of knowledge which is applicable for engineering management practice. Based on a brief analysis of engineering management practice,this paper analyzed the development progres of engineering management from engineering thinking to ethical thinking and philosophical thinking. A dynamic model formed from the modern engineering management theory was put forward. The construction of projects are divided into two stages:an investment decision-making stage, and project implementation stage. According to the fact that project owners obtain the project products by transaction,the management during project implementation stage are divided into two aspects:project transaction management for the owner, and construction project management for the contractor. Thus, the three theoretical modules of modern engineering management were established:project investment decision-making management theory,engineering transaction management theory, and engineering project management theory. This paper further analyzed the content and basic theoretical issues of each theoretical module.

  15. Projected oriented organizations as development of enterprise management methods

    Directory of Open Access Journals (Sweden)

    S.I. Pavlova

    2016-12-01

    Full Text Available Dynamic external environment, significant shortage of product life cycle, increase of product technological difficulty, extension of innovative knowledge motivates managers to look for and use in their activities keys that will provide constant, stable development of organizational structures. The methodology of project enterprise management meets the requirements of «preservation through development». The articles researches the integration of methods and procedures of project management into the enterprise management system. Project management philosophy is the efficient way of existence in the competitive environment and the means for internal development of a company. The author conducts an analysis, determines the essence and peculiarities of a project-oriented enterprise, performs comparing characteristics of functional and project management, describes the stages of gradual transformation of an enterprise organizational structure into a project-oriented one. It is defined that a project-oriented enterprise is that one which functions on the base of innovative development and are scientific, creative and widely use the project activity as the means of a steady development. The article describes internal and external instruments of project management, base knowledge systems on project management and possibilities of enterprises on audit of state of system project management in an enterprise according to the IPMA certification program on the territory of Ukraine.

  16. Material management performance indicators for upper management

    International Nuclear Information System (INIS)

    O'Loughlin, R.C.

    1987-01-01

    The purpose of this paper is to develop a case for the use of performance indicators by upper management to monitor the effectiveness of material management operations at nuclear power plants. The paper establishes that the use of performance indicators is not a pro forma matter. There are specific standards and conditions to which the material management operation must conform for the performance measures to be meaningful. The paper concludes with discussion of the application and use of specific performance indicators. Proper use of selected performance indicators can remove the mystery and uncertainty for management about an aspect of nuclear plant operations that has significant budget implications

  17. Culture and conflict management style of international project managers

    OpenAIRE

    Mohammed, U. K.; Prabhakar, G. P.; White, G.

    2008-01-01

    The management of culture has become increasingly important to many organisations and business disciplines, particularly multicultural and international project management. Cultural differences often result in varying degrees of conflict and require careful consideration. This study surveys 116 Project Managers using the Thomas-Kilmann Conflict Mode Instrument to determine their approach toward managing conflict. Indian, French and UK Project Managers’ conflict management style are correlated...

  18. Environmental Management Performance Report July 2000

    Energy Technology Data Exchange (ETDEWEB)

    EDER, D.M.

    2000-07-01

    The purpose of this report is to provide the Department of Energy Richland Operations Office (DOE-RL) a monthly summary of the Project Hanford Management Contractor's (PHMC) Environmental Management (EM) performance by Fluor Hanford (FH) and its subcont.

  19. PERFORMANCE ANALYSIS OF PROJECTS IMPLEMENTATION IN HEIS

    Directory of Open Access Journals (Sweden)

    Sergiu-Vlad PETCU

    2015-04-01

    Full Text Available According to the European Commission, Romania is still facing significant mismatch between the skills of graduates of tertiary education and the market needs. This paper is highly relevant for the future implementation of HEIs, since they have a strong economic role and they can significantly influence long-term national social and economical development. Romania did not manage to materialize community funds allocated for the 2007-2013 programming period to its full potential. Accordingly, the proposed thesis intends to analyse how Romanian HEIs were able to manage community resources attracted by grants and how the implemented projects achieved their set objectives. According to the data collected so far, the results will show that the performance of the projects is directly dependent on the proportion of fully dedicated staff in organizational design of the project. The originality of the undertaken study is that it starts from a realistic approach, according to which the rules of the game should be adapted, depending on the players (in our case – HEIs.

  20. Open Source Approach to Project Management Tools

    Directory of Open Access Journals (Sweden)

    Romeo MARGEA

    2011-01-01

    Full Text Available Managing large projects involving different groups of people and complex tasks can be challenging. The solution is to use Project management software, which allows a more efficient management of projects. However, famous project management systems can be costly and may require expensive custom servers. Even if free software is not as complex as Microsoft Project, is noteworthy to think that not all projects need all the features, amenities and power of such systems. There are free and open source software alternatives that meet the needs of most projects, and that allow Web access based on different platforms and locations. A starting stage in adopting an OSS in-house is finding and identifying existing open source solution. In this paper we present an overview of Open Source Project Management Software (OSPMS based on articles, reviews, books and developers’ web sites, about those that seem to be the most popular software in this category.

  1. MULTIPLE PROJECT MANAGEMENT IN THE CONSTRUCTION INDSUTRY

    Directory of Open Access Journals (Sweden)

    Luciana Hazin Alencar

    2010-06-01

    Full Text Available The field of project management has historically focused on the administration of one project at a time, a focus that is insufficient given the growing need for organizations to manage multiple projects simultaneously. The requirements of Multiple Project Management (MPM involves demands and practices that are different from those of single projects. MPM poses a special need for coordination of shared resources across multiple projects in a way that can maintain the firm’s strategic focus and facilitate effective decision making. The construction industry is noteworthy for its frequent need for the management of multiple projects. This paper offers a review of the last five years of indexed literature related to multiple project management in the construction industry, identifies gaps and suggests promising new avenues of inquiry.

  2. MANAGING INNOVATION PROJECTS USING DISTRIBUTION LOGISTICS

    Directory of Open Access Journals (Sweden)

    Erika Loučanová

    2015-12-01

    Full Text Available A significant part of innovation projects management is the distribution logistics. From the point of view of time and material content, the properly chosen way of distribution is one of many factors for success of the project and innovation creation itself. The paper points out the fundamental basis of innovation management in the stage of its realization referring to the importance of distribution logistics in this part of innovation project management. Distribution logistics in the project management provides comprehensive solutions to efficiency of tangible relocating processes in all connections and mutual relations of project in order to maintain compliance between economy and business when implementing innovations.

  3. Managing complex, high risk projects a guide to basic and advanced project management

    CERN Document Server

    Marle, Franck

    2016-01-01

    Maximizing reader insights into project management and handling complexity-driven risks, this book explores propagation effects, non-linear consequences, loops, and the emergence of positive properties that may occur over the course of a project. This book presents an introduction to project management and analysis of traditional project management approaches and their limits regarding complexity. It also includes overviews of recent research works about project complexity modelling and management as well as project complexity-driven issues. Moreover, the authors propose their own new approaches, new methodologies and new tools which may be used by project managers and/or researchers and/or students in the management of their projects. These new elements include project complexity definitions and frameworks, multi-criteria approaches for project complexity measurement, advanced methodologies for project management (propagation studies to anticipate potential behaviour of the project, and clustering approaches...

  4. Project Management in Real Time: A Service-Learning Project

    Science.gov (United States)

    Larson, Erik; Drexler, John A., Jr.

    2010-01-01

    This article describes a service-learning assignment for a project management course. It is designed to facilitate hands-on student learning of both the technical and the interpersonal aspects of project management, and it involves student engagement with real customers and real stakeholders in the creation of real events with real outcomes. As…

  5. Uranium Mill Tailings Remedial Action Project surface project management plan

    International Nuclear Information System (INIS)

    1994-09-01

    This Project Management Plan describes the planning, systems, and organization that shall be used to manage the Uranium Mill Tailings Remedial Action Project (UMTRA). US DOE is authorized to stabilize and control surface tailings and ground water contamination at 24 inactive uranium processing sites and associated vicinity properties containing uranium mill tailings and related residual radioactive materials

  6. Project management strategies for prototyping breakdowns

    DEFF Research Database (Denmark)

    Granlien, Maren Sander; Pries-Heje, Jan; Baskerville, Richard

    2009-01-01

    , managing the explorative and iterative aspects of prototyping projects is not a trivial task. We examine the managerial challenges in a small scale prototyping project in the Danish healthcare sector where a prototype breakdown and project escalation occurs. From this study we derive a framework...... of strategies for coping with escalation in troubled prototyping projects; the framework is based on project management triangle theory and is useful when considering how to manage prototype breakdown and escalation. All strategies were applied in the project case at different points in time. The strategies led...

  7. Chosen aspects of innovative projects management

    Directory of Open Access Journals (Sweden)

    J. Gawlik

    2010-07-01

    Full Text Available Any company willing to maintain its market position has to search and implement innovative products and services. Integrated development ofenterprise’s innovative activity requests a constant search for new technologies and new organizational forms. Ability of effectivemanagement of innovative projects becomes a crucial issue. The paper presents a characteristic of innovative projects accordingly toOECD standards. Project management concepts based on Project Management Institute (PMI and International Project ManagementAssociation (IPMA procedures have been discussed. Key success factors have been defined, i.e.: obtaining assumed project outcome (range, project implementation conform to planned schedule (deadline, maintaining project costs under a certain limit (budget, quality (are the customers satisfied?, resources (team losses and interpersonal relations. Tables comparing product innovativeness with fields of requested know – how for particular product innovativeness levels have been elaborated. Finally, SCRUM method of adaptive project management aiming at providing possibly optimal outcome has been described.

  8. 43 CFR 418.29 - Project management.

    Science.gov (United States)

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false Project management. 418.29 Section 418.29... INTERIOR OPERATING CRITERIA AND PROCEDURES FOR THE NEWLANDS RECLAMATION PROJECT, NEVADA Enforcement § 418.29 Project management. In addition to the provisions of § 418.28, if the District is found to be...

  9. Basic Project Management Methodologies for Survey Researchers.

    Science.gov (United States)

    Beach, Robert H.

    To be effective, project management requires a heavy dependence on the document, list, and computational capability of a computerized environment. Now that microcomputers are readily available, only the rediscovery of classic project management methodology is required for improved resource allocation in small research projects. This paper provides…

  10. SIMULATION OF ORGANIZATIONAL ILLNESSES IN PROJECT MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Денис Антонович ХАРИТОНОВ

    2015-05-01

    Full Text Available The article examined the fractal model of organizational diagnosis of pathologies in project management development. The proposed fractal model based on the competency approach to project management and allows evaluating the pathology of the project-oriented organizations.

  11. Adaptation of Agile Project Management Methodology for Project Team

    Directory of Open Access Journals (Sweden)

    Rasnacis Arturs

    2015-12-01

    Full Text Available A project management methodology that defines basic processes, tools, techniques, methods, resources and procedures used to manage a project is necessary for effective and successful IT project management. Each company needs to define its own methodology or adapt some of the existing ones. The purpose of the research is to evaluate the possibilities of adapting IT project development methodology according to the company, company employee characteristics and their mutual relations. The adaptation process will be illustrated with a case study at an IT company in Latvia where the developed methodology is based on Agile Scrum, one of the most widespread Agile methods.

  12. Software project management in a changing world

    CERN Document Server

    Ruhe, Günther

    2014-01-01

    By bringing together various current direc­tions, Software Project Management in a Changing World focuses on how people and organizations can make their processes more change-adaptive. The selected chapters closely correspond to the project management knowledge areas introduced by the Project Management Body of Knowledge, including its extension for managing software projects. The contributions are grouped into four parts, preceded by a general introduction. Part I "Fundamentals" provides in-depth insights into fundamental topics including resource allocation, cost estimation and risk manage

  13. Amine Swingbed Payload Project Management

    Science.gov (United States)

    Walsch, Mary; Curley, Su

    2013-01-01

    The International Space Station (ISS) has been designed as a laboratory for demonstrating technologies in a microgravity environment, benefitting exploration programs by reducing the overall risk of implementing such technologies in new spacecraft. At the beginning of fiscal year 2010, the ISS program manager requested that the amine-based, pressure-swing carbon dioxide and humidity absorption technology (designed by Hamilton Sundstrand, baselined for the Orion Multi-Purpose Crew Vehicle, and tested at the Johnson Space Center in relevant environments, including with humans, since 2005) be developed into a payload for ISS Utilization. In addition to evaluating the amine technology in a flight environment before the first launch of the Orion vehicle, the ISS program wanted to determine the capability of the amine technology to remove carbon dioxide from the ISS cabin environment at the metabolic rate of the full 6 ]person crew. Because the amine technology vents the absorbed carbon dioxide and water vapor to space vacuum (open loop), additional hardware needed to be developed to minimize the amount of air and water resources lost overboard. Additionally, the payload system would be launched on two separate Space Shuttle flights, with the heart of the payload-the swingbed unit itself-launching a full year before the remainder of the payload. This paper discusses the project management and challenges of developing the amine swingbed payload in order to accomplish the technology objectives of both the open -loop Orion application as well as the closed-loop ISS application.

  14. Improving Project Portfolio Management (PPM) for Improvement Projects

    DEFF Research Database (Denmark)

    Pries-Heje, Jan; Jakobsen, Peter M.; Korsaa, Morten

    2017-01-01

    Project Portfolio Management (PPM) focus on the integration and alignment of projects with the business operation in order to achieve most value and cost-efficiency for the investment in projects. PPM is often a challenge and especially so for improvement projects where PPM is considerably...... of evaluating a portfolio of improvement projects and combine this evaluation with the effect they have on the CMMI maturity level. Further, the paper demonstrates how the combination of a strong senior management requirement for improved maturity and the focus on getting the most value out of PPM made...

  15. The project manager's desk reference: project planning, schedulding, evaluation, control, systems

    National Research Council Canada - National Science Library

    Lewis, James P

    2007-01-01

    In this Third Edition of The Project Manager's Desk Reference, top project management consultant James Lewis arms you with today's most comprehensive and understandable project management resources...

  16. Status of Project Management Education in Pakistan

    Science.gov (United States)

    Arain, Faisal Manzoor; Tipu, Syed Awais Ahmad

    2009-01-01

    Emerging contractual delivery systems, collaborative partnerships, new management initiatives, and global product markets require professionals and students to have a broader awareness of construction methods and project management issues. This paper presents the state of the project management education in Pakistan. The analysis is based on…

  17. Scheduling in Engineering, Project, and Production Management

    OpenAIRE

    Chien-Ho Ko

    2015-01-01

    This issue presents five papers selected from the 2013 (4th) International Conference on Engineering, Project, and Production Management (EPPM2013) held in Bangkok, Thailand. Three of the papers deal with scheduling problems faced in project and production management, while the remaining two focus on engineering management issues.

  18. Ambidextrous Leadership and Sustainability-Based Project Performance: The Role of Project Culture

    Directory of Open Access Journals (Sweden)

    Junwei Zheng

    2017-12-01

    Full Text Available Most studies in the project management field emphasized the effects of leaders or managers, but these effects have rarely been examined at the project level. To cover this research gap, this study applies organizational ambidexterity theory to examine the effects among ambidextrous leadership, ambidextrous culture and sustainability-based project performance. Using a valid sample of 217 project leaders and members from Chinese construction projects, the method of multiple linear regression was adopted to assess the direct relationship among ambidextrous leadership, ambidextrous culture and project performance. Moreover, the bootstrapping technique through structural equation modeling, has been used to analyze the mediating effect of ambidextrous culture. Additionally, the sample data was divided into different groups according to the median value of the variables to conduct the ANOVA and to assess the within-group differences. The results indicated a positive and direct relationship that ambidextrous leadership has on project performance and ambidextrous culture. In addition, there was also a mediating impact of ambidextrous leadership on project performance via ambidextrous culture. Thus, ambidextrous leadership combined with transformational leadership as well as transactional leadership likely has a stronger positive impact on project performance through fostering the adaptive culture and consistent culture. Our findings contribute to an in-depth understanding of the role of the leader and culture for project outcomes. The project-based organization in construction projects could train project leaders’ ambidextrous leadership behavior to facilitate the formation of an ambidextrous culture and to increase project performance. Moreover, this study enriches the existing literature on leadership and project management by highlighting the important path of ambidextrous leadership and ambidextrous culture on the performance at the project level

  19. 36 CFR 64.11 - Project performance.

    Science.gov (United States)

    2010-07-01

    ... 36 Parks, Forests, and Public Property 1 2010-07-01 2010-07-01 false Project performance. 64.11 Section 64.11 Parks, Forests, and Public Property NATIONAL PARK SERVICE, DEPARTMENT OF THE INTERIOR GRANTS... Project performance. The State or local applicant shall be responsible for insuring the project is carried...

  20. Analysis Of Performance Factors Of Construction Management Consultant Affecting The Failure In Achieving Time And Quality Targets On Construction Project Of Samarinda Baru Airport

    Directory of Open Access Journals (Sweden)

    Maryudi Utomo

    2017-11-01

    Full Text Available This research aims to determine the performance factors of construction management consultants affecting the failure in achieving time and quality targets on construction project of Samarinda Baru Airport. This research uses survey method by collecting respondents opinion experience and attitude by taking primary data from questionnaires and secondary data from related institutions. The results of the research are 1 Factors directly affecting the Time Target Y1 are the Understanding of Contract Document X1 Material Requirements X3 Worker Requirements X4 and Equipment Completeness X5 while factors indirectly affecting the Time Target Y1 are the Understanding of Technical Specifications X2 and Local Government Regulations X7 2 Factors directly affecting the Quality Target Y2 are the Understanding of Contract Document X1 the Understanding of Technical Specifications X2 Material Requirements X3 Worker Requirements X4 Equipment Completeness X5 and Time Target Y1 while factor indirectly affecting the Quality Target Y1 is Local Government Regulations X7 3 The most dominant factor affecting the unsuccessful Time Target Y1 is the Worker Requirements X4 with the path coefficient value of 0.431. While the most dominant factor affecting the unsuccessful Quality Target Y2 is Worker Requirements X4 with path coefficient value of 0.579 4.

  1. Construction project management handbook : September 2009.

    Science.gov (United States)

    2009-09-01

    The purpose of this Handbook is to provide guidelines for use by public transit agencies (Agencies) undertaking substantial construction : projects, either for the first time or with little prior experience with construction project management. It pr...

  2. Electronic Resources Management Project Presentation 2012

    KAUST Repository

    Ramli, Rindra M.

    2012-01-01

    This presentation describes the electronic resources management project undertaken by the KAUST library. The objectives of this project is to migrate information from MS Sharepoint to Millennium ERM module. One of the advantages of this migration

  3. Managing risks in the project pipeline.

    Science.gov (United States)

    2013-08-01

    This research focuses on how to manage the risks of project costs and revenue uncertainties over the long-term, and identifies significant : process improvements to ensure projects are delivered on time and as intended, thus maximizing the miles pave...

  4. Client's Constraining Factors to Construction Project Management

    African Journals Online (AJOL)

    factors as a significant system that constrains project management success of public and ... finance for the project and prompt payment for work executed; clients .... consideration of the loading patterns of these variables, the major factor is ...

  5. Designing the owner's nuclear project management organization

    International Nuclear Information System (INIS)

    Cooke, T.C.; Peck, B.H.

    1976-01-01

    Few decisions are more important to an electric utility company than the one to build a nuclear generating facility. This decision will require continuous management attention to the nuclear project for periods of up to ten years on the part of the utility. Effective management of such a large, complex project requires an owner's organization skilled in such areas as engineering, heavy construction, procurement, and project control. The paper describes a method for designing the owner's nuclear organization. Factors considered include the identification of milestone events and phases of the project and identification of key organizational groups and their degree of involvement. A series of important decision milestones is also identified for structuring the organization. A step-by-step analysis involving a set of evaluation criteria results in a recommended organization that can be staffed by the owner according to the degree of involvement desired. This technique of analysis could also be performed using different evaluation criteria resulting in other options for the owner's organization

  6. Prototype road weather performance management tool : installation instructions & user manual.

    Science.gov (United States)

    2016-07-20

    This document is the Installation Instructions and User Manual for the Road Weather Performance Management (RW-PM) Tool developed for the project on Development and Demonstration of a Prototype Road Weather Performance Management Application that Use...

  7. IT project management 30 steps to success

    CERN Document Server

    Doraiswamy, Premanand

    2011-01-01

    This pocket guide is designed to help IT project managers to succeed, and is based on the author's years of experience in IT project management. The guide's step-by-step approach will enable those new to IT project management, or intending to make a career in this field, to master the essential skills. For seasoned professionals, the pocket guide offers an invaluable concise reference guide.

  8. Early warnings : a phenomenon in project management

    OpenAIRE

    Nikander, Ilmari O.

    2002-01-01

    The emergence of Concurrent Engineering has caused growing demands on project management. The classic project management methods are often slow: problems may already exist when those methods are applied. The objective of the present study is to improve the opportunities of those responsible for a project's operational management to receive advance information about potential problems and final results through early warnings typical of the theory of weak signals by Igor Ansoff. The researc...

  9. Risk Management and Uncertainty in Infrastructure Projects

    DEFF Research Database (Denmark)

    Harty, Chris; Neerup Themsen, Tim; Tryggestad, Kjell

    2014-01-01

    The assumption that large complex projects should be managed in order to reduce uncertainty and increase predictability is not new. What is relatively new, however, is that uncertainty reduction can and should be obtained through formal risk management approaches. We question both assumptions...... by addressing a more fundamental question about the role of knowledge in current risk management practices. Inquiries into the predominant approaches to risk management in large infrastructure and construction projects reveal their assumptions about knowledge and we discuss the ramifications these have...... for project and construction management. Our argument and claim is that predominant risk management approaches tends to reinforce conventional ideas of project control whilst undermining other notions of value and relevance of built assets and project management process. These approaches fail to consider...

  10. Changing Pedagogical Means in Project Management

    DEFF Research Database (Denmark)

    Thorsteinsson, Uffe

    1998-01-01

    Presentation of two parts in a new concept for changing education in a university course in project management. First part concern running the couse as a project. Second part concern integrated use of Internet.......Presentation of two parts in a new concept for changing education in a university course in project management. First part concern running the couse as a project. Second part concern integrated use of Internet....

  11. Managing complex industrial change through projects

    OpenAIRE

    Perotti , Clément; Minel , Stéphanie; Benoit , Roussel; Jean , Renaud

    2010-01-01

    International audience; This paper proposes some elements showing that project is an appropriate way to manage organizational change, and that an individual change occurs during these phases. We suggest that project team should manage individual change in the framework of project for three main reasons. First, being at the crossroad of strategic and operational levels, project team is in the right position in organisation to "translate" organizational change to individuals, and vice-versa. Se...

  12. Project as a System and its Management

    Directory of Open Access Journals (Sweden)

    Jiří Skalický

    2017-06-01

    Full Text Available The contribution aims to describe project as a system, to define project control goal and strategy, control variables and their relationships. Three common control variables represented by the project triangle, are extended by two other important variables – project risk and quality. The control system consists of two components: social one – project manager and project team – and technical one – project dynamic simulation model as a decision making support of project manager in project milestones. In the project planning phase, the project baseline with planned controlled variables is created. In milestones after project launch, the actual values of these variables are measured. If the actual values deviate from planned ones, corrective actions are proposed and new baseline for the following control interval is created. Project plan takes into account the actual project progress and optimum corrective actions are determined by simulation, respecting control strategy and availability of resources. The contribution presents list of references to articles dealing with project as a system and its simulation. In most cases, they refer to the project control using the Earned Value Management method and its derivatives. Using of the dynamic simulation model for project monitoring and control, suggested in this contribution, presents a novel approach. The proposed model can serve as departure point to future research of authors and for development of appropriate and applicable tool.

  13. Lifecycle management for nuclear engineering project documents

    International Nuclear Information System (INIS)

    Zhang Li; Zhang Ming; Zhang Ling

    2010-01-01

    The nuclear engineering project documents with great quantity and various types of data, in which the relationships of each document are complex, the edition of document update frequently, are managed difficultly. While the safety of project even the nuclear safety is threatened seriously by the false documents and mistakes. In order to ensure the integrality, veracity and validity of project documents, the lifecycle theory of document is applied to build documents center, record center, structure and database of document lifecycle management system. And the lifecycle management is used to the documents of nuclear engineering projects from the production to pigeonhole, to satisfy the quality requirement of nuclear engineering projects. (authors)

  14. The Danish Agenda for Rethinking Project Management

    DEFF Research Database (Denmark)

    Svejvig, Per; Grex, Sara

    2016-01-01

    Purpose – The purpose of this paper is to analyze the similarities and differences between the Danish Re-thinking Project Management initiative named Project Half Double (PHD) and the rethinking project man-agement (RPM) research stream. The paper furthermore discusses how PHD and RPM can inspire...... ideas and local implementations. Findings – RPM and PHD share a focus on value creation, social processes, learning and complexity while PHD also focuses on lean thinking, agile thinking, front-end loading and leadership, which are largely topics beyond the RPM research stream. Originality...... a foundation for further development of both rethinking project management and Project Half Double....

  15. The Danish Agenda for Rethinking Project Management

    DEFF Research Database (Denmark)

    Svejvig, Per; Grex, Sara

    2016-01-01

    Purpose – The purpose of this paper is to analyze the similarities and differences between the Danish Re-thinking Project Management initiative named Project Half Double (PHD) and the rethinking project man-agement (RPM) research stream. The paper furthermore discusses how PHD and RPM can inspire...... a foundation for further development of both rethinking project management and Project Half Double....... each other in research and practice. Design/methodology/approach – This is an empirical paper based on collaborative research between in-dustry and researchers. PHD has developed principles and practices driven by industry consisting of 10 leading stars and the impact, leadership and flow (ILF) method...

  16. Your Project Management Coach Best Practices for Managing Projects in the Real World

    CERN Document Server

    Biafore, Bonnie

    2012-01-01

    A pragmatic approach to project management Many projects fail to deliver on time or on budget, or even to deliver a workable product that satisfies the customer. While good project management goes a long way towards ensuring success, managers often fail to follow the plans they implement. This unique guide helps you understand and successfully handle project management, once and for all. Covering practical ways to solve problems you'll typically face when managing actual projects, this pragmatic book takes you through a full project management lifecycle. You'll find ample tips, tricks, and bes

  17. Process-based software project management

    CERN Document Server

    Goodman, F Alan

    2006-01-01

    Not connecting software project management (SPM) to actual, real-world development processes can lead to a complete divorcing of SPM to software engineering that can undermine any successful software project. By explaining how a layered process architectural model improves operational efficiency, Process-Based Software Project Management outlines a new method that is more effective than the traditional method when dealing with SPM. With a clear and easy-to-read approach, the book discusses the benefits of an integrated project management-process management connection. The described tight coup

  18. Performance of NCAP projection displays

    Science.gov (United States)

    Jones, Philip J.; Tomita, Akira; Wartenberg, Mark

    1991-08-01

    Prototypes of projection displays based on dispersions of liquid crystal in polymer matrices are beginning to appear. The principle of operation depends on electrically switchable light scattering. They are potentially much brighter than current cathode ray tube (CRT) or twisted nematic liquid crystal (TN LC) cell based displays. Comparisons of efficacy and efficiency show this. The contrast and brightness of such displays depend on a combination of the f- number of the projection system and the scattering characteristics of the light valve. Simplified equations can be derived to show these effects. The degree of scattering of current NCAP formulations is sufficient to produce good contrast projection displays, at convenient voltages, that are around three times brighter than TN LC projectors because of the lack of polarizers in the former.

  19. Adapting Project Management Practices to Research-Based Projects

    Science.gov (United States)

    Bahr, P.; Baker, T.; Corbin, B.; Keith, L.; Loerch, L.; Mullenax, C.; Myers, R.; Rhodes, B.; Skytland, N.

    2007-01-01

    From dealing with the inherent uncertainties in outcomes of scientific research to the lack of applicability of current NASA Procedural Requirements guidance documentation, research-based projects present challenges that require unique application of classical project management techniques. If additionally challenged by the creation of a new program transitioning from basic to applied research in a technical environment often unfamiliar with the cost and schedule constraints addressed by project management practices, such projects can find themselves struggling throughout their life cycles. Finally, supplying deliverables to a prime vehicle customer, also in the formative stage, adds further complexity to the development and management of research-based projects. The Biomedical Research and Countermeasures Projects Branch at NASA Johnson Space Center encompasses several diverse applied research-based or research-enabling projects within the newly-formed Human Research Program. This presentation will provide a brief overview of the organizational structure and environment in which these projects operate and how the projects coordinate to address and manage technical requirements. We will identify several of the challenges (cost, technical, schedule, and personnel) encountered by projects across the Branch, present case reports of actions taken and techniques implemented to deal with these challenges, and then close the session with an open forum discussion of remaining challenges and potential mitigations.

  20. Remedial Action and Waste Disposal Project Manager's Implementing Instructions

    International Nuclear Information System (INIS)

    Dronen, V.R.

    1998-01-01

    These Project Manager's Implementing Instructions provide the performance standards required of all Environmental Restoration Contractor personnel in their work during operation and administration of the Remedial Action and Waste Disposal Project. The instructions emphasize technical competency, workplace discipline, and personal accountability to ensure a high level of safety and performance during operations activities

  1. SRP [Salt Repository Project] configuration management plan

    International Nuclear Information System (INIS)

    1987-01-01

    This configuration management plan describes the organization, policies, and procedures that will be used on the Salt Repository Project (SRP) to implement the configuration management disciplines and controls. Configuration management is a part of baseline management. Baseline management is defined in the SRP Baseline Procedures Notebook and also includes cost and schedule baselines. Configuration management is a discipline applying technical and administrative direction and surveillance to identify and document the functional and physical characteristics of an item, to control changes to those characteristics, to record and report change processing and implementation status, and to audit the results. Configuration management is designed as a project management tool to determine and control baselines, and ensure and document all components of a project interface both physically and functionally. The purpose is to ensure that the product acquired satisfies the project's technical and operational requirements, and that the technical requirements are clearly defined and controlled throughout the development and acquisition process. 5 figs

  2. AFSC Laboratory Management Information Requirements Project

    National Research Council Canada - National Science Library

    1982-01-01

    This document was developed under the auspices of the Laboratory IRM (LIRM) Management Working Group in response to AFSC Program Directive 0008-81-1, Management Information Requirement Project (23 February 1981...

  3. Practical project management: tips, tactics, and tools

    National Research Council Canada - National Science Library

    Levine, Harvey A

    2002-01-01

    ... Elements of Resource Management 4.2 Role-based Needs for Managing Resources in a Project-driven Organization 4.3 Resource Leveling and Games of Chance 4.4 Practical Resource Scheduling 117 119 12...

  4. INFORMATION TECHNOLOGY IN INVESTMENT PROJECT MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Vjacheslav A. Kozlov

    2014-01-01

    Full Text Available In the article it is proved that use of information technology today is not only something innovative distinctive feature and competitive advantage for organizations, but it is a necessary condition for effective business. The article discusses the main functionality of financial-analytical system Project Expert as an effective tool of investment project management and instrument of business planning. The main advantages which organizations get from Project Expert program use are in detail considered. Thus in the article Project Expert is considered as the effective tool of investment project management which allows to receive a number of advantages and to carry out the qualitative analysis of projects.

  5. Integrated Risk Management Within NASA Programs/Projects

    Science.gov (United States)

    Connley, Warren; Rad, Adrian; Botzum, Stephen

    2004-01-01

    As NASA Project Risk Management activities continue to evolve, the need to successfully integrate risk management processes across the life cycle, between functional disciplines, stakeholders, various management policies, and within cost, schedule and performance requirements/constraints become more evident and important. Today's programs and projects are complex undertakings that include a myriad of processes, tools, techniques, management arrangements and other variables all of which must function together in order to achieve mission success. The perception and impact of risk may vary significantly among stakeholders and may influence decisions that may have unintended consequences on the project during a future phase of the life cycle. In these cases, risks may be unintentionally and/or arbitrarily transferred to others without the benefit of a comprehensive systemic risk assessment. Integrating risk across people, processes, and project requirements/constraints serves to enhance decisions, strengthen communication pathways, and reinforce the ability of the project team to identify and manage risks across the broad spectrum of project management responsibilities. The ability to identify risks in all areas of project management increases the likelihood a project will identify significant issues before they become problems and allows projects to make effective and efficient use of shrinking resources. By getting a total team integrated risk effort, applying a disciplined and rigorous process, along with understanding project requirements/constraints provides the opportunity for more effective risk management. Applying an integrated approach to risk management makes it possible to do a better job at balancing safety, cost, schedule, operational performance and other elements of risk. This paper will examine how people, processes, and project requirements/constraints can be integrated across the project lifecycle for better risk management and ultimately improve the

  6. A Proposal for a Mindset of a Project Manager

    DEFF Research Database (Denmark)

    Eriksson, Joakim; Hansen, Claus Thorp

    2008-01-01

    and clarification of decision situations and consequences is rarely used in practice and structured reasoning about project and product performance when making decisions is also rare. In order to enhance the project managers’ understanding of decision-making in product development projects, the objective......A company’s product strategy and its management of the product development process have been found to be key factors for a product’s success on the market [1]. Project managers of development projects need support to make process decisions and defining goals that are consistent with the business....... In product development projects it is desirable to reduce the level of uncertainty in order to make decisions without having to redo them later in the project resulting in longer lead time and higher costs. It is the project manager’s responsibility to manage this uncertainty in a complex ever...

  7. Site quality management of engineering projects

    International Nuclear Information System (INIS)

    Jiang Yiqun

    2008-01-01

    Site quality management of an engineering project of NPIC was introduced in this paper. Requirements on organization and management, interfaces, and management of interior and exterior communication were put forward, by description of quality planning, process management, process monitoring and summarizing for the engineering projects. By the management of personnel, specifications and procedures, and the control of equipment, material and work surroundings, not only the safety is ensured, but also the quality and schedule of the engineering project were guaranteed, and so the expected quality goals were achieved. (author)

  8. Spent Nuclear Fuel Project dose management plan

    International Nuclear Information System (INIS)

    Bergsman, K.H.

    1996-03-01

    This dose management plan facilitates meeting the dose management and ALARA requirements applicable to the design activities of the Spent Nuclear Fuel Project, and establishes consistency of information used by multiple subprojects in ALARA evaluations. The method for meeting the ALARA requirements applicable to facility designs involves two components. The first is each Spent Nuclear Fuel Project subproject incorporating ALARA principles, ALARA design optimizations, and ALARA design reviews throughout the design of facilities and equipment. The second component is the Spent Nuclear Fuel Project management providing overall dose management guidance to the subprojects and oversight of the subproject dose management efforts

  9. Design project management mode as the introduction

    International Nuclear Information System (INIS)

    Zhang Xiaoping

    2014-01-01

    This article consider nuclear power plant's current design schedule management mode as the introduction, analysis of current management in-depth, summed up the advantage and disadvantage of the existing management mode. It makes use of mature closed loop cycle project management, and submits progress tracking model assumptions. It also introduces the purpose and background of the progress automation model, the theoretical assumptions of the model, the design criteria and evaluation system of indicators of progress. Based on the achievement process model, this article mainly discusses the specific processes and key points of the project closed loop cycle, and the improvement of the process of project management. (author)

  10. The Management of Projects and Product Experimentation

    DEFF Research Database (Denmark)

    Lorenzen, Mark; Frederiksen, Lars

    2005-01-01

    The paper analyses management of product innovation in project-based industries, offering a view on management not only of firms, but also of markets. It first argues that projects are prominent in industries where the nature of consumer demand means that product innovation takes place...... as experimentation. Then, the paper argues that if skills needed for projects are very diverse and projects are complex, there are few internal managerial economies of projects, and the scope for management then transcends the boundaries of firms. In these cases, markets become organized in combinations of people......, contracts, and other institutions, in order to facilitate the coordination of market-based projects. While contracts play a role, a continuous, active role of knowledgeable managers (leaders and boundary spanners) is also often necessary. Such managers --- and thus (core parts of) whole industries...

  11. How Does a Project Manager's Level of Development Influence Conceptualizations of Project Management and the Project Development Environment?

    Science.gov (United States)

    Lynch, Margaret M.

    2013-01-01

    This study explores the meaning project managers (PMs) make of their project environment, how they lead their teams and have incorporate complexity into their project management approach. The exploration of the PM's developmental level and meaning making offers a different angle on the project management and leadership literature. The study…

  12. Virtual reality boosts performance at AREVA Projects

    International Nuclear Information System (INIS)

    Bernasconi, F.

    2017-01-01

    AREVA Projects is one of the 6 business units of New AREVA and it is dedicated to engineering works in a vast fan of activities from mining to waste management via uranium chemistry and nuclear fuel recycling. AREVA projects has opted for innovation to improve performance. Since 2012 virtual reality has been used through the creation of a room equipped with a high-definition screen and stereoscopic goggles. At the beginning virtual reality was used to test and validate procedures for handling equipment thanks to a dynamical digital simulation of this equipment. Now virtual reality is massively used to validate the design phase of projects without having to fabricate a physical mock-up which saves time. The next step in the use of virtual reality is the implementation of a new version of devices like helmets, gloves... that will allow a better interaction with the virtual world. The continuously increasing of computer power is always pushing back the limits of what is possible in virtual reality. (A.C.)

  13. Environmental Management Assessment of the Fernald Environmental Management Project (FEMP)

    Energy Technology Data Exchange (ETDEWEB)

    1993-04-01

    This report documents the results of the Environmental Management Assessment performed at the Fernald Environmental Management Project (FEMP) in Fernald, Ohio. During this assessment, the activities conducted by the assessment team included review of internal documents and reports from previous audits and assessments; interviews with US Department of Energy (DOE) and FEMP contractor personnel; and inspection and observation of selected facilities and operations. The onsite portion of the assessment was conducted from March 15 through April 1, 1993, by DOE`s Office of Environmental Audit (EH-24) located within the Office of the Assistant Secretary for Environment, Safety, and Health (EH-1). EH-24 carries out independent assessments of DOE facilities and activities as part of the EH-1 Environment, Safety, and Health (ES&H) Oversight Audit Program. The EH-24 program is designed to evaluate the status of DOE facilities and activities with respect to compliance with Federal, state, and local environmental laws and regulations; compliance with DOE Orders, Guidance and Directives; conformance with accepted industry practices and standards of performance; and the status and adequacy of management systems developed to address environmental requirements. The Environmental Management Assessment of FEMP focused on the adequacy of environmental management systems. Further, in response to requests by the Office of Environmental Restoration and Waste Management (EM) and Fernald Field Office (FN), Quality Assurance and Environmental Radiation activities at FEMP were evaluated from a programmatic standpoint. The results of the evaluation of these areas are contained in the Environmental Protection Programs section in this report.

  14. Environmental Management Assessment of the Fernald Environmental Management Project (FEMP)

    International Nuclear Information System (INIS)

    1993-04-01

    This report documents the results of the Environmental Management Assessment performed at the Fernald Environmental Management Project (FEMP) in Fernald, Ohio. During this assessment, the activities conducted by the assessment team included review of internal documents and reports from previous audits and assessments; interviews with US Department of Energy (DOE) and FEMP contractor personnel; and inspection and observation of selected facilities and operations. The onsite portion of the assessment was conducted from March 15 through April 1, 1993, by DOE's Office of Environmental Audit (EH-24) located within the Office of the Assistant Secretary for Environment, Safety, and Health (EH-1). EH-24 carries out independent assessments of DOE facilities and activities as part of the EH-1 Environment, Safety, and Health (ES ampersand H) Oversight Audit Program. The EH-24 program is designed to evaluate the status of DOE facilities and activities with respect to compliance with Federal, state, and local environmental laws and regulations; compliance with DOE Orders, Guidance and Directives; conformance with accepted industry practices and standards of performance; and the status and adequacy of management systems developed to address environmental requirements. The Environmental Management Assessment of FEMP focused on the adequacy of environmental management systems. Further, in response to requests by the Office of Environmental Restoration and Waste Management (EM) and Fernald Field Office (FN), Quality Assurance and Environmental Radiation activities at FEMP were evaluated from a programmatic standpoint. The results of the evaluation of these areas are contained in the Environmental Protection Programs section in this report

  15. Risk Management in Information Technology Project: An Empirical Study

    Directory of Open Access Journals (Sweden)

    Kornelius Irfandhi

    2016-09-01

    Full Text Available The companies are facing some risks due to changes in a dynamic environment. If risks are not managed properly, it will have some negative impacts on the companies at the present and the future. One important function of the Information Technology (IT governance is risk management. Risk management in IT project aims to provide a safe environment for IT projects undertaken. Risk management becomes an important process for the success of IT projects. This article discussed the risk of IT project and whether there was a relationship between risk management and the success of the project. The method used was performing a literature review of several scientific articles which published between 2010 and 2014. The results of this study are the presence of risk management and risk manager influence the success of the project. Risk analysis and risk monitoring and control also have a relationship with the subjective performance of IT projects. If risk management is applied properly, the chance of the success of the projects undertaken can be increased. 

  16. Influential Factors Affecting Materials Management in Construction Projects

    Directory of Open Access Journals (Sweden)

    Jusoh Zairra Mat

    2017-12-01

    Full Text Available Construction projects are more often than not plagued by poor performances such as delays, cost overrun, low productivity, construction wastes and compromised quality. Amongst the critical contributory factors of poor project performances, is the ineffectiveness of materials management occurring in the construction sites. Indeed, materials management is a very important component for construction projects. However, there are only limited numbers of research available regarding this topic. Thus, this research focuses its study on materials management, specifically in identifying the influential factors that affect materials management in the construction project activities. Literatures from books, journal articles and conference papers related to poor project performances and materials management have been reviewed. Consequently, this study sorted the salient influential factors and categorized them based on their specific group. Out of 47 factors identified, they are classified into 8 groups. They are (1 site condition; (2 planning and handling on site; (3 management; (4 materials; (5 supplier and manufacturer default; (6 transportation; (7 contractual; and (8 governmental interferences. In conclusion, this study contends that by identifying the influential factors affecting materials management, it will help construction players to avoid the occurrence of those factors and will minimize the negative impacts on the overall performance of construction projects. Hence, the handling-over of project will be according to schedule and not delayed by materials mismanagement.

  17. Measures to improve nuclear power project management

    International Nuclear Information System (INIS)

    Ma Xinchao

    2012-01-01

    Focusing on correct application of ability level principle in setting organizational structure, the effective management system has been established, and 8 practical management regimes have been developed. Personnel training and management work shall be well done and enhanced. Experience feedback in construction management shall be well done for all systems. Exchange of construction and management techniques shall be actively carried out. All staff shall participate in safety management. KPI system is adopted for assessing stakeholders' project management method, and PDCA cycle is adopted for continued improved. Management level upgrading measures are proposed to ensure the smooth construction of nuclear power project. Setting forth and popularizing management theory can provide reference for and promote the smooth progress of various nuclear power projects. (author)

  18. FARM PERFORMANCE AND MANAGEMENT STRATEGIES

    Directory of Open Access Journals (Sweden)

    Li Li

    2018-04-01

    Full Text Available This article emphasizes the strategic and operations aspects of managing a farm. In this article, farm management performance is analyzed based on yearly Illinois Farm Business Farm Management (FBFM panel data across 9,831 farms from 1996 through 2014. The alpha scores (or skill estimates for farm managers are analyzed to determine if most profitable farmers possess specific skills or knowledge against adverse events in a volatile environment. Farms are evaluated under different scenarios of management skill portfolios. Fundamental farm management basics are discussed in this study, including budgeting, production planning, financial analysis, financial management, investment analysis, and control management. We find substantial difference of farm management styles and performance efficiency in management skill portfolios. We also find evidence of most skilled farm managers are more efficient on both revenue side and costs side. The approaches used in this study also allow comparison among farms of different sizes and types. The activities of top farms can be replicated by poorer performers and the study provide a unique way for comparing the farm management styles and ability of most skilled farm managers to that of less skilled ones. The innovative method is framed by comparing business strategies and performance styles in the following aspects: production and operations planning, land management and control, and production costs evaluation. Farm managers will want to consult it as well to improve the effectiveness, objectivity, and success of their decisions.

  19. Project risk management: A review of an institutional project life cycle

    Directory of Open Access Journals (Sweden)

    Wanjiru Gachie

    2017-11-01

    Full Text Available This article is a desktop analysis of project risk management involving a project management institutional restructuring. The pragmatic nature of this research allows for the literature review and the document analysis to be integrated and presented as both a descriptive and analytical research. The analysis demonstrates that the project committee did not proactively manage project risk. The restructuring was a change management project, entailing the implementation of many organisational changes, such as restructuring, lay-off of some part of the administrative workforce, adoption of new technology, provision of new approaches to well-established procedures, and implementation of new performance initiative, the process which should have been managed with an effective integrated risk strategy and plan. Analysis of the restructuring project risk management exhibits little evidence of a systematic (computer based or manual record that should have provided policies, procedures, and structures for managing risk. The article concludes that the restructuring risk process was inadequate and it could not have ensured a successful project. An analysis of the restructuring project risk monitoring and control exhibits a reactive rather than proactive application of risk management procedures. The analysis further indicates that the committee failed to make use of the various project risk management processes, standards, and guidelines. Based on the conclusions, the article recommends that project risk planning, strategy, control, and monitoring should be put in place for future institutional projects. The project management team should also put in place procedures for primary stakeholders engagements, identify and address their nature of interest and power in future risk management projects

  20. Applied software risk management a guide for software project managers

    CERN Document Server

    Pandian, C Ravindranath

    2006-01-01

    Few software projects are completed on time, on budget, and to their original specifications. Focusing on what practitioners need to know about risk in the pursuit of delivering software projects, Applied Software Risk Management: A Guide for Software Project Managers covers key components of the risk management process and the software development process, as well as best practices for software risk identification, risk planning, and risk analysis. Written in a clear and concise manner, this resource presents concepts and practical insight into managing risk. It first covers risk-driven project management, risk management processes, risk attributes, risk identification, and risk analysis. The book continues by examining responses to risk, the tracking and modeling of risks, intelligence gathering, and integrated risk management. It concludes with details on drafting and implementing procedures. A diary of a risk manager provides insight in implementing risk management processes.Bringing together concepts ...

  1. Project Management Accountability System (PMAS) - Project Information and Data

    Data.gov (United States)

    Department of Veterans Affairs — The PMAS Dashboard provides a wide range of helpful data and information to assist you in project management and assessment. The drop down menu can be used to search...

  2. MANAGE INTERESTED PARTIES IN PROJECT ENVIRONMENT

    Directory of Open Access Journals (Sweden)

    BILOKON A. I.

    2016-04-01

    Full Text Available The success or failure of the project often depends on factors which related to the environment, surrounded by the project and which are outside of the direct control of the project manager. The concept of the project environment, the processes of environmental analysis of the project and the ways in which managers can identify potential problems and develop a plan of action to ensure the success of the project. The management strategy the main factors of the environment includes both organizational forms and measures which aimed at the development process. For alignment of the organizational forms of communication manager must have a clear idea: what kind of interested persons and their actions (functions need to monitor, and in what form to maintain communication (bilateral relations of interdependence. This information is key to the further construction of the formal organization that supports interaction, the definition of its functions, competencies, allocation of roles, areas of responsibility, instructions, forms and methods of work. Purpose. Summarize, analyze and form an idea of the potential of existing approaches to the management of the project environment. Object of study. Management processes of the persons, who interested in the project environment. Subject of study. Methods and tools for the project management environment.

  3. Wisdom for Building the Project Manager/Project Sponsor Relationship: Partnership for Project Success

    National Research Council Canada - National Science Library

    Patton, Nanette; Shechet, Allan

    2007-01-01

    .... This article discusses conventional roles and responsibilities of the project sponsor and then discusses strategies a project manager can employ to define boundaries to reduce role confusion and promote partnership to facilitate project success.

  4. Spent Nuclear Fuel Project Configuration Management Plan

    International Nuclear Information System (INIS)

    Reilly, M.A.

    1995-01-01

    This document is a rewrite of the draft ''C'' that was agreed to ''in principle'' by SNF Project level 2 managers on EDT 609835, dated March 1995 (not released). The implementation process philosphy was changed in keeping with the ongoing reengineering of the WHC Controlled Manuals to achieve configuration management within the SNF Project

  5. Comparison of community managed projects and conventional ...

    African Journals Online (AJOL)

    Comparison of community managed projects and conventional approaches in rural water supply of Ethiopia. ... African Journal of Environmental Science and Technology ... This study aimed to compare Community Managed Projects (CMP) approach with the conventional approaches (Non-CMP) in the case of Ethiopia.

  6. Sustainability in Project Management: Reality Bites

    NARCIS (Netherlands)

    Gilbert Gilbert Silvius; Ron Schipper; Snezana Nedeski

    2012-01-01

    The relationship between project management and sustainable development is rapidly gaining interest from both practitioners and academics. Studies on the integration of the concepts of sustainability into project management, approach this topic mostly from a conceptual, logical or moral point of

  7. Nuclear power project management information system

    International Nuclear Information System (INIS)

    Zou Lailong; Zhang Peng; Xiao Ziyan; Chun Zengjun; Huang Futong

    2001-01-01

    Project Management Information System is an important infrastructure facility for the construction and operation of Nuclear Power Station. Based on the practice of Lingao nuclear power project management information system (NPMIS), the author describes the NPMIS design goals, system architecture and software functionality, points out the outline issues during the development and deployment of NPMIS

  8. Analyzing Project Management Maturity Level in Indonesia

    Directory of Open Access Journals (Sweden)

    Eliot Simangunsong

    2013-04-01

    Full Text Available Project management has been generally known and increasingly used by many organizations to gain competitive advantage. In this context, many studies have proposed maturity models to evaluate how project management knowledge has been deployed effectively and efficiently in or- ganization. As a developing country, Indonesia needs many development projects managed by government and private companies in different industries. Here, a study to assess project manage- ment maturity level in Indonesian businesses may bring insight about current business practices, which is important to speed up country development and business sustainability. Adapting the Project Management Maturity Model (ProMMM, a survey instrument has been developed and ap- plied to professionals from Jakarta and surrounding area. The result of analysis shows that con- struction and primary industry have a higher maturity level compare to manufacturing and servic- es. It is to be noted, however, that the level of project management understanding is low across in- dustries. This indicates that more quality project management training or certification is required to improve overall project management knowledge in Indonesia.

  9. Improvement of Construction Project Management Processes

    Directory of Open Access Journals (Sweden)

    Nazarko, J.

    2017-07-01

    Full Text Available The common denominator of the five papers published in the current edition of the Journal of Engineering, Project, and Production Management is the improvement of construction project management processes for effective use of resources. Execution of proper project management processes is widely recognized as a key success factor influencing likelihood of project success (Alleman, 2014. It is noticeable that four out of five papers in this issue of the Journal are authored or co-authored by Iranian researchers from the same Institute but their conclusions bear importance that cannot be limited to the authors’ region.

  10. Environmental Restoration Project - Systems Engineering Management Plan

    International Nuclear Information System (INIS)

    Anderson, T.D.

    1998-06-01

    This Environmental Restoration (ER) Project Systems Engineering Management Plan (SEMP) describes relevant Environmental Restoration Contractor (ERC) management processes and shows how they implement systems engineering. The objective of this SEMP is to explain and demonstrate how systems engineering is being approached and implemented in the ER Project. The application of systems engineering appropriate to the general nature and scope of the project is summarized in Section 2.0. The basic ER Project management approach is described in Section 3.0. The interrelation and integration of project practices and systems engineering are outlined in Section 4.0. Integration with sitewide systems engineering under the Project Hanford Management Contract is described in Section 5.0

  11. Reflexive project management in high-abition projects

    NARCIS (Netherlands)

    Loeber, Anne; Vermeulen, T.

    2016-01-01

    Purpose
    The Aristotelian notion of phronèsis inspired innovative work in the realm of project management as well as in literature on sustainability and societal transformations. We argue that both literatures may benefit from a dialogue between the two, especially in view of outlining project

  12. Client's constraining factors to construction project management ...

    African Journals Online (AJOL)

    This study analyzed client's related factors that constrain project management success of public and private sector construction in Nigeria. Issues that concern clients in any project can not be undermined as they are the owners and the initiators of project proposals. It is assumed that success, failure or abandonment of ...

  13. INTEGRATION OF PROGRESS STRATEGY IN PROJECT MANAGEMENT

    OpenAIRE

    Дмитрий Георгиевич БЕЗУГЛЫЙ

    2015-01-01

    The methods and tools of the developed project promotion, the planning system of promotion strategy are suggested; the main approaches used in the project promotion have been identified. The conclusions about the importance, necessity and role in the promotion of a holistic project management system have been made.

  14. Communication Scaffolds for Project Management in PBL

    Science.gov (United States)

    Sasaki, Shigeru; Arai, Masayuki; Takai, Kumiko; Ogawa, Mitsuhiro; Watanabe, Hiroyoshi

    2017-01-01

    In this study, the role-playing situation and the system requirement list are adopted into project-based learning classes to develop web applications. In the classes, the third-year undergraduate project managers communicate with the client of the project rolled by teachers on the Web bulletin board. These are expected to act as scaffolds to…

  15. The Impact of Project Management Maturity upon IT/IS Project Management Outcomes

    Science.gov (United States)

    Carcillo, Anthony Joseph, Jr.

    2013-01-01

    Although it is assumed that increasing the institutionalization (or maturity) of project management in an organization leads to greater project success, the literature has diverse views. The purpose of this mixed methods study was to examine the correlation between project management maturity and IT/IS project outcomes. The sample consisted of two…

  16. Project managing your simulator DCS upgrade

    International Nuclear Information System (INIS)

    Carr, S.

    2006-01-01

    The intention of this paper is to provide helpful information and tips for the purchaser with regard to the project management of a DCS upgrade for an existing nuclear power station operator-training simulator. This paper was written shortly after STS Powergen completed two nuclear power station simulator DCS projects in the USA. Areas covered by this paper are: - Contractual documents and arrangements; - Licence and Escrow agreements; - Liquidated damages; - Project management; - Project schedules and resources; - Monitoring progress; - Defect reporting; - DCS automation code; - Access to proprietary information; - Tips for project meetings; - Testing; - Cultural issues; - Training

  17. Project Management in the Finnish Music Industry

    OpenAIRE

    Hypén, Joel

    2009-01-01

    The term project is a widely used phrase in today’s working life. This thesis explains what project management theory is, how it has evolved through history and how it is applied in managing modern business projects in the contexts of the Finnish music business sector. The literature review contains a description of the key phases a project is typically organised in as well as the terms and tools used to plan and run a successful project. Through qualitative research means the thesis inves...

  18. The Fast Forward MBA in Project Management

    CERN Document Server

    Verzuh, Eric

    2011-01-01

    An updated and revised edition of the bestselling guide to managing projects For any professional responsible for coordinating projects among different departments, across executive levels, or with technical complexity, The Fast Forward MBA in Project Management offers comprehensive instruction on how to deliver on time and on budget. Get the step-by-step advice you need to find the right sponsor, clarify objectives, and set realistic schedules and budget projections. This Fourth Edition of the 200,000-copy bestseller now covers critical new topics including: software and IT projects, agile te

  19. Facilities projects performance measurement system

    International Nuclear Information System (INIS)

    Erben, J.F.

    1979-01-01

    The two DOE-owned facilities at Hanford, the Fuels and Materials Examination Facility (FMEF), and the Fusion Materials Irradiation Test Facility (FMIT), are described. The performance measurement systems used at these two facilities are next described

  20. Project management training : final report.

    Science.gov (United States)

    2011-01-01

    In 2005 the Indiana Department of Transportation (INDOT) went through a complete reorganization of its operations going from centralized to decentralized (District) management. This reorganization gave Districts autonomy to manage construction projec...

  1. Project management training : [technical summary].

    Science.gov (United States)

    2011-01-01

    In 2005, the Indiana Department of Transportation (INDOT) went through a complete reorganization of its operations going from centralized to decentralized (District) management. This reorganization gave Districts autonomy to manage construction proje...

  2. Making Things Happen Mastering Project Management

    CERN Document Server

    Berkun, Scott

    2008-01-01

    In the updated edition of this critically acclaimed and bestselling book, Microsoft insider Scott Berkun offers a collection of essays on field-tested philosophies and strategies for defining, leading, and managing projects. Based on his nine years of experience as a program manager for Microsoft's biggest projects, Berkun explains to technical and non-technical readers alike what it takes to get through a large software or web development project.

  3. Using electronic document management systems to manage highway project files.

    Science.gov (United States)

    2011-12-12

    "WisDOTs Bureau of Technical Services is interested in learning about the practices of other state departments of : transportation in developing and implementing an electronic document management system to manage highway : project files"

  4. Management evolution in the LSST project

    Science.gov (United States)

    Sweeney, Donald; Claver, Charles; Jacoby, Suzanne; Kantor, Jeffrey; Krabbendam, Victor; Kurita, Nadine

    2010-07-01

    The Large Synoptic Survey Telescope (LSST) project has evolved from just a few staff members in 2003 to about 100 in 2010; the affiliation of four founding institutions has grown to 32 universities, government laboratories, and industry. The public private collaboration aims to complete the estimated $450 M observatory in the 2017 timeframe. During the design phase of the project from 2003 to the present the management structure has been remarkably stable. At the same time, the funding levels, staffing levels and scientific community participation have grown dramatically. The LSSTC has introduced project controls and tools required to manage the LSST's complex funding model, technical structure and distributed work force. Project controls have been configured to comply with the requirements of federal funding agencies. Some of these tools for risk management, configuration control and resource-loaded schedule have been effective and others have not. Technical tasks associated with building the LSST are distributed into three subsystems: Telescope & Site, Camera, and Data Management. Each sub-system has its own experienced Project Manager and System Scientist. Delegation of authority is enabling and effective; it encourages a strong sense of ownership within the project. At the project level, subsystem management follows the principle that there is one Board of Directors, Director, and Project Manager who have overall authority.

  5. Project management in interior design services

    OpenAIRE

    Şahinoglu, Alp

    1997-01-01

    Ankara : Bilkent University, Department of Interior Architecture and Environmental Design and Institute of Fine Arts, 1997. Thesis (Master's) -- Bilkent University, 1997. Includes bibliographical references. In this study, the concept of project management is analyzed within the framework of interior design services. Project management has been defined as the managing and coordination of all human and physical resources, in order to accomplish the predetermined goals (aim of the proj...

  6. Redefining Project Management Information Systems with New IT Services

    Directory of Open Access Journals (Sweden)

    Luminita Hurbean

    2013-04-01

    Full Text Available Achieving successful adoption of an innovative project management information system should involve influencing the project management environment by providing useful tools, training, reusable templates, techniques, and methods that improve the project manager's ability to successfully execute. This paper suggests that project management practice, enabled by emerging IT, could more explicitly recognize, represent, and manage the interdependencies that are pervasive throughout projects, thereby fully exploiting the potential of the IT to improve overall project performance. The last few years IT&C evolution led to new approaches to application and infrastructure architecture. Breaking from the traditional procedures used by organizations, they propose a cloud operating platform that reduces complexity and improves agility and scalability by altering the approach to the way data centres are built, applications are developed, infrastructure is managed, and organizations align and collaborate. Further, the paper explores the growing impact of mobile computing, cloud delivery and social business collaboration project management information systems and proposes a shift of a Five C’s for information systems in a cloud based operating platform, driven by cooperation, teamwork and continuous improvement.The proposed shift in the cloud indicates actual tools that may be adopted for better collaboration and higher business value of the project information management.

  7. The appliction of project management in operations preparation of nuclear power station

    International Nuclear Information System (INIS)

    Tang Zhengrong; Zhang Zhixiong

    2001-01-01

    Concept, history, characteristics of the project management is introduced. Analysis is performed on the suitability of application of project management approach in nuclear power station operations preparation. Then the application of project management is detailed in order to present the readers our study and practice. Theory and practice indicate that the project management is a useful management tool for operations preparation of nuclear power station to achieve a good performance

  8. The application of project management in operations preparation of nuclear power station

    International Nuclear Information System (INIS)

    Zhang Zhixiong; Tang Zhengrong

    2000-01-01

    The author first presents a brief introduction of the concept, history, characteristics of project management. Analysis is performed on the suitability of application of project management approach in nuclear power station operations preparation. Then the application of project management is detailed in order to present the readers authors' study and practice. Theory and practice indicate that the project management is a useful management tool for operations preparation of nuclear power station to achieve a good performance

  9. Project management for profit a failsafe guide to keeping projects on track and on budget

    CERN Document Server

    Knight, Joe; Angus, Brad; Case, John

    2012-01-01

    If your work involves projects, then this book is for you. It will show every company owner and project manager—at businesses large and small—how to run projects differently. You’ll benefit if you’ve ever: • been over budget on a project • exceeded a timeline on a project • worked on a project that completely stalled as you neared the finish line • lost money on a sure-thing project and had no idea why • noticed that scope and feature creep held you back • watched a project take three times as long as planned • felt too embarrassed to perform a review of your successes and failures • wondered whether your project actually made any money By the time you finish the book, you’ll be ready to implement Project Management for Profit in your own company—and be prepared to keep your projects on track and on budget.

  10. Project network-oriented materials management policy for complex projects

    DEFF Research Database (Denmark)

    Dixit, Vijaya; Srivastava, Rajiv K; Chaudhuri, Atanu

    2015-01-01

    This work devises a materials management policy integrated with project network characteristics of complex projects. It proposes a relative quantitative measure, overall criticality (OC), for prioritisation of items based on penalty incurred due to their non-availability. In complex projects...... managerial tacit knowledge which provides them enough flexibility to provide information in real form. Computed OC values can be used for items prioritisation and as shortage cost coefficient in inventory models. The revised materials management policy was applied to a shipbuilding project. OC values were......, practicing managers find it difficult to measure OC of items because of the subjective factors and intractable nature of penalties involved. However, using their experience, they can linguistically identify the antecedents and relate them to consequent OC. This work adopts Fuzzy Set Theory to capture...

  11. Project brief of pre-contract in project management

    International Nuclear Information System (INIS)

    Mohd Jamil Hashim; Mohd Azmi Sidid Omar; Abdul Rahman Norazumin; Zakaria Dris; Abdul Murad Abu Bakar; Alwi Othman

    2010-01-01

    Project brief is a comprehensive document used in translating the user needs and requirement for the project implementation. This document is important for the designer as a main guidance towards establishing project details. Research shown that problem usually arises from not well-defined scope and needs by the user. With lack of information the designer tend to assume and interprets wrong translation. Other issues arise from project management are time, cost, budgetary, lack of communication and establishing quality management. Some ideas of improvement were gain by doing cross reference with JKR quality system management, workshop and brainstorming. It shows that an improvement of data collection system has to be integrating with some basic format details, drawings and declaration forms to be established. (author)

  12. HUBUNGAN KOMPETENSI PROJECT MANAGER TERHADAP KEBERHASILAN PROYEK KONSTRUKSI GEDUNG

    Directory of Open Access Journals (Sweden)

    Ida Ayu Ari Brahmantariguna

    2016-07-01

    Full Text Available Abstract :One of the factor that influences the achievement of a project success is the role of a project manager. A reliable project manager, who knows his duties as a project leader and has the necessary competency requirements is needed to achieve the success of the project. The competence of a project manager can be measured by three aspects: knowledge, skill and attitude.This research  aims to analyze the relationship between project manager competencies (that measured by three independent variables, i.e. Knowledge, skills and attitude and the success of the building construction project. Data was collected through a questionnaire survey. The sample/ respondents were the expertise in the field of building construction services those acts as a project manager. Data was analyzed  in three stages:first, factor analysis to reduce the variables into several groups of factors, that called as independent variables; second, correlation test with Pearson Correlation method to determine the correlation between independent variables  and dependent variable; lastly, perform multivariate regression analysis The results of factor analysis showed that the variables are formed into eleven groups, and the result of Pearson Correlation test showed only six groups correlated to project success, those are: Communication and Scope Management, Human Resource Management, which is part of knowledge; Leadership and Project Management, Professionalism and Issues Management as part of skill; and attitude concerning Responsibility, Vision and Priorities. The sixth group of these factors will be the independent variables in multivariate regression analysis. Based on multiple correlation test results, six independent variables simultaneously have a significant influence to the project success, proved by the result of probability value is 0,032.

  13. Comparisons on International Approaches of Business and Project Risk Management

    OpenAIRE

    Nadia Carmen ENE

    2005-01-01

    In this article we intend to present a comparative approach between three recognized international methodologies for risk management: RISKMAN, Project Management Institute Methodology-PMBoK and Project Risk Analysis and Management Guide (produced by Association for Project Management).

  14. SYSTEM DYNAMICS OF MANAGEMENT OF "UNFORESEEN CIRCUMSTANCES" OF THE PROJECT

    Directory of Open Access Journals (Sweden)

    Богдан Владимирович ГАЙДАБРУС

    2015-05-01

    Full Text Available Approaches for project contingency management through risk management and influence of stakeholders. Proposed system dynamic contingency project management model. The model describes the effects of various factors on the phase of project management through contingency.

  15. SYSTEM DYNAMICS OF MANAGEMENT OF "UNFORESEEN CIRCUMSTANCES" OF THE PROJECT

    OpenAIRE

    Богдан Владимирович ГАЙДАБРУС; Евгений Анатольевич ДРУЖИНИН

    2015-01-01

    Approaches for project contingency management through risk management and influence of stakeholders. Proposed system dynamic contingency project management model. The model describes the effects of various factors on the phase of project management through contingency.

  16. Framework for managing uncertainty in property projects

    NARCIS (Netherlands)

    Reymen, I.M.M.J.; Dewulf, G.P.M.R.; Blokpoel, S.B.

    2008-01-01

    A primary task of property development (or real estate development, RED) is making assessments and managing risks and uncertainties. Property managers cope with a wide range of uncertainties, particularly in the early project phases. Although the existing literature addresses the management of

  17. Challenges in planning and performing the retrieval of the prototype repository at Aespoe HRL- Project management's reflections and practical experiences from field work

    International Nuclear Information System (INIS)

    Grahm, Paer; Hagman, Patrik; Johannesson, Lars-Erik

    2012-01-01

    Document available in extended abstract form only. Since 2001 the Prototype Repository at Aespoe Hard Rock Laboratory has been carried out as a large-scale experimental installation of the KBS-3 Swedish/Finnish concept for final disposal of spent nuclear fuel. The overall objective of the trial 'Prototype Repository' is to test and demonstrate the integrated function of sub-components in a final repository under realistic full-scale conditions. Data from the experiment shall also be compared to results from modelling based on site conditions. Opening of the outer section for the Prototype Repository was recognized as substantial operation. No trial of this size has been made earlier with regard to removal of buffer and backfilling. Experience was available only from retrieval of the buffer in Canister Retrieval Test at Aespoe HRL where samples of the buffer were taken, down to the mid-height of the canister. It was expected that sampling of the buffer in the deposition holes of the Prototype Repository would be very difficult, especially deep down in the holes. No significant experience regarding the breaching of such a concrete plug or removing backfill was available. The lack of experience together with the size of the project made extensive planning essential before the opening and removal could begin. It was decided that SKB (Sweden) and Posiva Oy (Finland) should run the project in a co-operation, where SKB is responsible for managing the project. In addition, a wide international interest was observed and accordingly waste management organisations were invited by SKB and Posiva to be a party to the Retrieval of the Prototype Repository. Six individual project agreements were signed with Andra (France), NUMO (Japan), NDA (United Kingdom), NAGRA (Switzerland), BMWi (Germany) and NWMO (Canada). The planning of the Retrieval of the Prototype Repository (section II) started at the beginning of 2010. The planning phase was successful meaning that the breaching of

  18. Quality management in an international nuclear power plant project

    International Nuclear Information System (INIS)

    Brion, J.; Crustin, J.

    1975-01-01

    SNR (Schneller Natriumgekuehlter Reaktor) is the fast reactor power plant being erected at Kalkar, Federal German Republic. Quality management in this project is a contractual obligation. Quality management is subdivided into quality engineering, set of actions performed before manufacturing, and quality control, set of material controls performed during fabrication. The two successive phases of the quality management are presented. The difficulties and improvment possibilities are discussed [fr

  19. Project management for economical nuclear energy

    International Nuclear Information System (INIS)

    Majerle, P.P.

    2005-01-01

    The price of electricity is significantly influenced by the cost of the initial generation asset. The cost of the initial nuclear generation asset is significantly influenced by the design and construction duration. Negative variations in the cost and duration of actual design and construction have historically impacted the early relative economics of nuclear power generation. Successful management of plant design information will mitigate the risks of the design and construction of future nuclear plants. Information management tools that can model the integrated delivery of large complex projects enable the project owners to accurately evaluate project progress, as well as the economic impact of regulatory, political, or market activities not anticipated in the project execution plan. Significant differences exist in the electrical energy markets, project delivery models, and fuel availability between continents and countries. However, each market and project delivery model is challenged by the need to produce economical electrical energy. The information management system presented in this paper provides a means to capture in a single integrated computerized database the design information developed during plant design, procurement, and construction and to allow this information to be updated and retrieved in real time by all project participants. Utilization of the information management system described herein will enable diverse project teams to rapidly and reliably input, share, and retrieve power plant information, thereby supporting project management's goal to make good on its commitment to the economic promise of tomorrow's nuclear electrical power generation by achieving cost-effective construction. (authors)

  20. Managing organizational performance in Africa

    DEFF Research Database (Denmark)

    Kuada, John

    2012-01-01

    Discusses the interplay of political, economic, social and cultural factors in the management of the performance of public and private organizations in Africa......Discusses the interplay of political, economic, social and cultural factors in the management of the performance of public and private organizations in Africa...

  1. Extended Enterprise performance Management

    NARCIS (Netherlands)

    Bobbink, Maria Lammerdina; Hartmann, Andreas

    2014-01-01

    The allegiance of partnering organisations and their employees to an Extended Enterprise performance is its proverbial sword of Damocles. Literature on Extended Enterprises focuses on collaboration, inter-organizational integration and learning to avoid diminishing or missing allegiance becoming an

  2. Project management of radwaste retrofits

    International Nuclear Information System (INIS)

    Vaught, D.L.

    1988-01-01

    Many utilities are finding it necessary to provide additional radioactive waste processing facilities at operating or nearly completed nuclear stations in order to accommodate the ever-changing regulatory, political and socio-economic environment in which we operate. This paper describes the project approach taken at Duke Power Company to provide a comprehensive radioactive waste processing facility at Oconee Nuclear Station. Following a historical perspective, the philosophy and mechanics of the project team are discussed. The goal of the project team was to provide a facility which could meet the liquid and solid radioactive waste processing needs of Oconee within the restraints of a utility budget and schedule. The unique quality of the project team approach was the integral involvement of all of the necessary departments in every part of the design, construction and start-up phases. The project team thereby utilized feedback from over thirty reactor years of operational experience. The remainder of the paper provides examples of the problems encountered and their resolution (eg. equipment layout, materials handling, vendor improvements and regulatory changes all required design-in-progress changes). It has been the integration and concentration of the diverse resources of a large utility into a cross-departmental team which has allowed the timely resolution of the necessary changes. This same philosophy is being applied to the facility start-up program and to other major projects at Duke Power Company

  3. Analysis of Factors Influencing Building Refurbishment Project Performance

    Science.gov (United States)

    Ishak, Nurfadzillah; Aswad Ibrahim, Fazdliel; Azizi Azizan, Muhammad

    2018-03-01

    Presently, the refurbishment approach becomes favourable as it creates opportunities to incorporate sustainable value with other building improvement. In this regard, this approach needs to be implemented due to the issues on overwhelming ratio of existing building to new construction, which also can contribute to the environmental problem. Refurbishment principles imply to minimize the environmental impact and upgrading the performance of an existing building to meet new requirements. In theoretically, building project's performance has a direct bearing on related to its potential for project success. However, in refurbishment building projects, the criteria for measure are become wider because the projects are a complex and multi-dimensional which encompassing many factors which reflect to the nature of works. Therefore, this impetus could be achieve by examine the direct empirical relationship between critical success factors (CSFs) and complexity factors (CFs) during managing the project in relation to delivering success on project performance. The research findings will be expected as the basis of future research in establish appropriate framework that provides information on managing refurbishment building projects and enhancing the project management competency for a better-built environment.

  4. Automated transportation management system (ATMS) software project management plan (SPMP)

    Energy Technology Data Exchange (ETDEWEB)

    Weidert, R.S., Westinghouse Hanford

    1996-05-20

    The Automated Transportation Management System (ATMS) Software Project Management plan (SPMP) is the lead planning document governing the life cycle of the ATMS and its integration into the Transportation Information Network (TIN). This SPMP defines the project tasks, deliverables, and high level schedules involved in developing the client/server ATMS software.

  5. Bottomland Hardwood Ecosystem Management Project

    Science.gov (United States)

    John A. Stanturf; Calvin E. Meier

    1994-01-01

    Federal agency approaches to land management are undergoing a shift from parcel-specific concerns toward a more holistic, ecosystem management approach. Southern bottomland hardwood ecosystems provide important environmental services and commodity goods (Wharton et al. 1982), yet much of our knowledge of these systems comes from anecdotal information. The Bottomland...

  6. An Analytical Method for Measuring Competence in Project Management

    Science.gov (United States)

    González-Marcos, Ana; Alba-Elías, Fernando; Ordieres-Meré, Joaquín

    2016-01-01

    The goal of this paper is to present a competence assessment method in project management that is based on participants' performance and value creation. It seeks to close an existing gap in competence assessment in higher education. The proposed method relies on information and communication technology (ICT) tools and combines Project Management…

  7. Identity and the Management Project

    DEFF Research Database (Denmark)

    Jørgensen, Kenneth Mølbjerg; Dehlin, Erlend

    The paper discusses the concept of identity in relation to management. We take our starting point in Wittgenstein’s concept language games. We argue that identity is a question of using linguistic tools to construct reality. Two elements of the language game metaphor are central here: rules...... and family resemblance. As such, managing identity in organizations is closely linked to rules and family resemblance. Organizations manage identity through the definition of norms and values for right or wrong, appropriate or inappropriate, to name but a few. Norms and values are important as reference...... points for constructing identities. Managing identity has become more important because the rules-of-the-game have become more unstable. Managing identity is important if the bonds between individuals and organizations are to be sustained. But this task is contradictory and paradoxical of its very nature...

  8. Nuclear project management experience in Korea

    International Nuclear Information System (INIS)

    Jae-Pung Jeon

    1987-01-01

    Korea Electric Power Corporation (KEPCO) has been dereloping nuclear power steadily over last 30 years to support effective economic growth of the nation with cheap electric power. In the course of development, KEPCO has experienced various project management patterns diverging from turn-key contracts with foreign vendors to non-turnkey with local affiliates. To culative own project management capabilities, one has to pay continuous efforts for better management systems development and manpower training. KEPCO is ready to share its priceless experiences gained over last three decades of nuclear project operation with any developing nation. (Liu)

  9. Management of projects for energy efficiency

    Directory of Open Access Journals (Sweden)

    Vuković Miodrag M.

    2014-01-01

    Full Text Available In an effort to lower operating costs and improve competitiveness, many organizations today are preparing projects in the field of energy saving. On the other hand, companies that provide energy services and implement these projects, need to build competences in this area to well manage the projects which are subject to energy savings and by this to justify the confidence of investors. This paper presents research that shows the most important factors for the development of local capacity in project management in the field of energy efficiency.

  10. Strategic management of HLW repository projects

    International Nuclear Information System (INIS)

    Bartlett, J.W.

    1984-01-01

    This paper suggests an approach to strategic management of HLW repository projects based on the premise that a primary objective of project activities is resolution of issues. The approach would be implemented by establishing an issues management function with responsibility to define the issues agenda, develop and apply the tools for assessing progress toward issue resolution, and develop the issue resolution criteria. A principal merit of the approach is that it provides a defensible rationale for project plans and activities. It also helps avoid unnecessary costs and schedule delays, and it helps assure coordination between project functions that share responsibilities for issue resolution

  11. Forecast Inaccuracies in Power Plant Projects From Project Managers' Perspectives

    Science.gov (United States)

    Sanabria, Orlando

    Guided by organizational theory, this phenomenological study explored the factors affecting forecast preparation and inaccuracies during the construction of fossil fuel-fired power plants in the United States. Forecast inaccuracies can create financial stress and uncertain profits during the project construction phase. A combination of purposeful and snowball sampling supported the selection of participants. Twenty project managers with over 15 years of experience in power generation and project experience across the United States were interviewed within a 2-month period. From the inductive codification and descriptive analysis, 5 themes emerged: (a) project monitoring, (b) cost control, (c) management review frequency, (d) factors to achieve a precise forecast, and (e) factors causing forecast inaccuracies. The findings of the study showed the factors necessary to achieve a precise forecast includes a detailed project schedule, accurate labor cost estimates, monthly project reviews and risk assessment, and proper utilization of accounting systems to monitor costs. The primary factors reported as causing forecast inaccuracies were cost overruns by subcontractors, scope gaps, labor cost and availability of labor, and equipment and material cost. Results of this study could improve planning accuracy and the effective use of resources during construction of power plants. The study results could contribute to social change by providing a framework to project managers to lessen forecast inaccuracies, and promote construction of power plants that will generate employment opportunities and economic development.

  12. Managing human performance

    International Nuclear Information System (INIS)

    Bishop, J.; LaRhette, R.

    1988-01-01

    Evaluating human error or human performance problems and correcting the root causes can help preclude recurrence. The Institute of Nuclear Power Operations (INPO), working with several members and participant utilities in an extended pilot program, has developed a nonpunitive program designed to identify, evaluate, and correct situations that cause human performance errors. The program is called the Human Performance Evaluation System (HPES). Its primary goal is to improve human reliability in overall nuclear plant operations by reducing human error through correction of the conditions that cause the errors. Workers at participating nuclear utilities are encouraged to report their errors and a specially trained plant coordinator investigates and recommends actions to correct the root causes of these errors

  13. Globalization And Knowledge Management In Projects

    Directory of Open Access Journals (Sweden)

    Bubel Dagmara

    2015-06-01

    Full Text Available Knowledge management is a field of management dealing with the use of knowledge, methods, and tools to effectively coordinate complex and unique projects. In accordance with this definition, project knowledge can be treated as a useful resource of information that allows projects to be implemented in compliance with its objectives: time, costs, and quality of results. Knowledge in the activity of an organization, including in the implementation of projects, has for many years been an area of interest to researchers, who confirmed its key importance for building permanent competitive advantages of companies and enterprises. In project management, this issue takes on a new character, as it is transferred to the field of dynamic, time restricted, temporary, and team-implemented projects. The aim of this paper is to present the results of a survey regarding the use of practices of knowledge management in projects in international organizations and to show that the concept of knowledge management in projects is a tool conducive to spreading the process of globalization.

  14. Key performance indicators for successful simulation projects

    OpenAIRE

    Jahangirian, M; Taylor, SJE; Young, T; Robinson, S

    2016-01-01

    There are many factors that may contribute to the successful delivery of a simulation project. To provide a structured approach to assessing the impact various factors have on project success, we propose a top-down framework whereby 15 Key Performance Indicators (KPI) are developed that represent the level of successfulness of simulation projects from various perspectives. They are linked to a set of Critical Success Factors (CSF) as reported in the simulation literature. A single measure cal...

  15. Risk management methodology for RBMN project

    International Nuclear Information System (INIS)

    Borssatto, Maria F.B.; Tello, Cledola C.O.; Uemura, George

    2013-01-01

    RBMN Project has been developed to design, construct and commission a national repository to dispose the low- and intermediate-level radioactive wastes from the operation of nuclear power plants and other industries that use radioactive sources and materials. Risk is a characteristic of all projects. The risks arise from uncertainties due to assumptions associated with the project and the environment in which it is executed. Risk management is the method by which these uncertainties are systematically monitored to ensure that the objectives of the project will be achieved. Considering the peculiarities of the Project, that is, comprehensive scope, multidisciplinary team, apparently polemic due to the unknowing of the subject by the stake holders, especially the community, it is being developed a specific methodology for risk management of this Project. This methodology will be critical for future generations who will be responsible for the final stages of the repository. It will provide greater guarantee to the processes already implemented and will maintain a specific list of risks and solutions for this Project, ensuring safety and security of the repository throughout its life cycle that is the planned to last at least three hundred years. This paper presents the tools and processes already defined, management actions aimed at developing a culture of proactive risk in order to minimize threats to this Project and promote actions that bring opportunities to its success. The methodology is based on solid research on the subject, considering methodologies already established and globally recognized as best practices for project management. (author)

  16. An Approach for Implementation of Project Management Information Systems

    Science.gov (United States)

    Běrziša, Solvita; Grabis, Jānis

    Project management is governed by project management methodologies, standards, and other regulatory requirements. This chapter proposes an approach for implementing and configuring project management information systems according to requirements defined by these methodologies. The approach uses a project management specification framework to describe project management methodologies in a standardized manner. This specification is used to automatically configure the project management information system by applying appropriate transformation mechanisms. Development of the standardized framework is based on analysis of typical project management concepts and process and existing XML-based representations of project management. A demonstration example of project management information system's configuration is provided.

  17. Belene NPP project configuration management

    International Nuclear Information System (INIS)

    Matveev, A.

    2009-01-01

    The configuration management includes: change identification; change assessment; change coordination; change approval or rejection; Change introduction. One of the main tasks while implementing the above processes is the analysis of the effect of one change upon all the related elements

  18. Environmental Management Performance Report June 2000

    Energy Technology Data Exchange (ETDEWEB)

    EDER, D.M.

    2000-06-01

    The purpose of this report is to provide the Department of Energy Richland Operations Office (DOE-RL) a monthly summary of the Project Hanford Management Contractor's (PHMC) Environmental Management (EM) performance by Fluor Hanford (FH) and its subcontractors. In addition to project-specific information, it includes some PHMC-level data not detailed elsewhere in the report. Section A, Executive Summary, provides an executive level summary of the cost, schedule, and technical performance described in this report. It summarizes performance for the period covered, highlights areas worthy of management attention, and provides a forward look to some of the upcoming key performance activities as extracted from the PHMC baseline. The remaining sections provide detailed performance data relative to each individual Project (e.g., Waste Management, Spent Nuclear Fuels, etc.), in support of Section A of the report. Unless otherwise noted, the Safety, Conduct of Operations, and Cost/Schedule data contained herein is as of April 30, 2000. All other information is updated as of May 19, unless otherwise noted.

  19. Environmental Management Performance Report September 2000

    International Nuclear Information System (INIS)

    EDER, D.M.

    2000-01-01

    The purpose of this report is to provide the Department of Energy Richland Operations Office (DOE-RL) a monthly summary of the Project Hanford Management Contractor's (PHMC) Environmental Management (EM) performance by Fluor Hanford (FH) and its subcontractors. In addition to project-specific information, it includes some PHMC-level data not detailed elsewhere in the report. Section A, Executive Summary, provides an executive level summary of the cost, schedule, and technical performance described in this report. It summarizes performance for the period covered, highlights areas worthy of management attention, and provides a forward look to some of the upcoming key performance activities as extracted from the PHMC baseline. The remaining sections provide detailed performance data relative to each individual Project (e.g., Waste Management, Spent Nuclear Fuels, etc.), in support of Section A of the report. Unless otherwise noted, the Safety, Conduct of Operations, and Cost/Schedule data contained herein is as of July 31, 2000. All other information is updated as of August 24, unless otherwise noted. ''Stoplight'' boxes are used to indicate at a glance the condition of a particular area. Green boxes denote on schedule. Yellows denote behind schedule but recoverable. Red is either missed or unrecoverable

  20. Strategically oriented management and controlling of resource intensive projects

    International Nuclear Information System (INIS)

    Kemmeter, Sascha

    2015-01-01

    The book on strategically oriented management and controlling of resource intensive projects covers the following issues: frame of project management and project controlling, classification of the decommissioning of nuclear facilities as resource intensive projects, research design for case studies, results of the study of project management specific characteristics of decommissioning, reference model for the project management of nuclear facility decommissioning.

  1. Agile Project Management for e-Learning Developments

    Science.gov (United States)

    Doherty, Iain

    2010-01-01

    We outline the project management tactics that we developed in praxis in order to manage elearning projects and show how our tactics were enhanced through implementing project management techniques from a formal project management methodology. Two key factors have contributed to our project management success. The first is maintaining a clear…

  2. Risk management integration into complex project organizations

    Science.gov (United States)

    Fisher, K.; Greanias, G.; Rose, J.; Dumas, R.

    2002-01-01

    This paper describes the approach used in designing and adapting the SIRTF prototype, discusses some of the lessons learned in developing the SIRTF prototype, and explains the adaptability of the risk management database to varying levels project complexity.

  3. A proposed model for construction project management ...

    African Journals Online (AJOL)

    Log in or Register to get access to full text downloads. ... (decision-making, problem-solving, listening, verbal competency, motivation, persuasion, ... Keywords: Communication skills and leadership model, construction project management, ...

  4. Project Management and Total Quality Management : Complementary or confused?

    Directory of Open Access Journals (Sweden)

    Selma KATLANE BEN MLOUKA

    2009-01-01

    Full Text Available Quality management and project management appear as themes of strategic management today. The adoption of the project management constitutes a new way in organizing the production. It helps to cope with the complexity of the environment, to reduce the product life cycles and to make working arrangements more flexible. It should also adapt to the ICT revolution and restructuring of enterprises due to the dematerialisation of structures and transactions. Quality management, applied to more operations and strongly influenced by the quantitative approach seems compatible with project management. Indeed, the two paradigms emphasize the importance of customer satisfaction, teamwork, the role of leadership and the continuous improvement of processes and products. This paper aims to revisit the principles of relationship between total quality management and project management. Having shown the importance of incorporating fine patterns and project quality in business organization, we will explain how the ability to generate, select and conduct projects in an oriented accountability of management is able to enroll in a total quality.

  5. Managing Projects with CSR in mind

    DEFF Research Database (Denmark)

    Kampf, Constance; Thomsen, Christa

    2008-01-01

    This paper examines project management as a place where CSR can be operationalized, focusing particularly on project conception processes and co-constructing CSR knowledge with emergent tertiary stakeholders. Two projects which dealt with emergent tertiary stakeholders differently are examined.......  First, the Finnish company Metsa-Botnia's paper pulp plant in Uruguay is examined as a project in which a tertiary stakeholder, Argentina, emerged during the early stages of the project.  Argentina requested dialogue about the project conception and Metsa Botnia did not include them.  In contrast......, the Danish emergency services company Falck A/S's project on redefining CSR is offered as an example of a project transformed through dialogue with the emergent tertiary stakeholder, the county of Aarhus.   To analyze the cases, the paper combines Morsing & Schultz's (2006) dialectic CSR strategy based...

  6. Information Technology in Engineering and Project Management

    Directory of Open Access Journals (Sweden)

    Chien-Ho Ko

    2017-01-01

    Full Text Available Information Technology (IT can be regarded as the use of computers to store, analyze, and manipulate data (Daintith, 2009. With the rapid development of personal computers, IT has been widely applied in nearly every field (Davenport, 2013. This issue presents five papers covering engineering and project management, three of which focus on the application of IT to solve engineering and project management issues, while one presents research into public private partnerships, and another into cash flow forecasting.

  7. Analysis of Factors Influencing Building Refurbishment Project Performance

    Directory of Open Access Journals (Sweden)

    Ishak Nurfadzillah

    2018-01-01

    Full Text Available Presently, the refurbishment approach becomes favourable as it creates opportunities to incorporate sustainable value with other building improvement. In this regard, this approach needs to be implemented due to the issues on overwhelming ratio of existing building to new construction, which also can contribute to the environmental problem. Refurbishment principles imply to minimize the environmental impact and upgrading the performance of an existing building to meet new requirements. In theoretically, building project’s performance has a direct bearing on related to its potential for project success. However, in refurbishment building projects, the criteria for measure are become wider because the projects are a complex and multi-dimensional which encompassing many factors which reflect to the nature of works. Therefore, this impetus could be achieve by examine the direct empirical relationship between critical success factors (CSFs and complexity factors (CFs during managing the project in relation to delivering success on project performance. The research findings will be expected as the basis of future research in establish appropriate framework that provides information on managing refurbishment building projects and enhancing the project management competency for a better-built environment.

  8. Project Management Plan for Material Stabilization

    International Nuclear Information System (INIS)

    SPEER, D.R.

    1999-01-01

    This plan presents the overall objectives, description, justification and planning for the plutonium Finishing Plant (PFP) Materials Stabilization project. The intent of this plan is to describe how this project will be managed and integrated with other facility stabilization and deactivation activities. This plan supplements the overall integrated plan presented in the Plutonium Finishing Plant Integrated Project Management Plan (IPMP), HNF-3617/Rev. 0. This is the top-level definitive project management document that specifies the technical (work scope), schedule, and cost baselines to manager the execution of this project. It describes the organizational approach and roles/responsibilities to be implemented to execute the project. This plan is under configuration management and any deviations must be authorized by appropriate change control action. Materials stabilization is designated the responsibility to open and stabilize containers of plutonium metal, oxides, alloys, compounds, and sources. Each of these items is at least 30 weight percent plutonium/uranium. The output of this project will be containers of materials in a safe and stable form suitable for storage pending final packaging and/or transportation offsite. The corrosion products along with oxides and compounds will be stabilized via muffle furnaces to reduce the materials to high fired oxides

  9. Integrating configuration workflows with project management system

    International Nuclear Information System (INIS)

    Nilsen, Dimitri; Weber, Pavel

    2014-01-01

    The complexity of the heterogeneous computing resources, services and recurring infrastructure changes at the GridKa WLCG Tier-1 computing center require a structured approach to configuration management and optimization of interplay between functional components of the whole system. A set of tools deployed at GridKa, including Puppet, Redmine, Foreman, SVN and Icinga, provides the administrative environment giving the possibility to define and develop configuration workflows, reduce the administrative effort and improve sustainable operation of the whole computing center. In this presentation we discuss the developed configuration scenarios implemented at GridKa, which we use for host installation, service deployment, change management procedures, service retirement etc. The integration of Puppet with a project management tool like Redmine provides us with the opportunity to track problem issues, organize tasks and automate these workflows. The interaction between Puppet and Redmine results in automatic updates of the issues related to the executed workflow performed by different system components. The extensive configuration workflows require collaboration and interaction between different departments like network, security, production etc. at GridKa. Redmine plugins developed at GridKa and integrated in its administrative environment provide an effective way of collaboration within the GridKa team. We present the structural overview of the software components, their connections, communication protocols and show a few working examples of the workflows and their automation.

  10. Estimation of efficiency project management

    Directory of Open Access Journals (Sweden)

    Novotorov Vladimir Yurevich

    2011-03-01

    Full Text Available In modern conditions, the effectiveness of the enterprises all in a greater degree depends on methods of management and business dealing forms. The organizations should choose the most effective for themselves strategy of management taking into account the existing legislation, concrete conditions of activity, financial and economic, investment potential and development strategy. Introduction of common system of planning and realization of strategy of the organization, it will allow to provide even development and long-term social and economic growth of the companies.

  11. Augmenting SCA project management and automation framework

    Science.gov (United States)

    Iyapparaja, M.; Sharma, Bhanupriya

    2017-11-01

    In our daily life we need to keep the records of the things in order to manage it in more efficient and proper way. Our Company manufactures semiconductor chips and sale it to the buyer. Sometimes it manufactures the entire product and sometimes partially and sometimes it sales the intermediary product obtained during manufacturing, so for the better management of the entire process there is a need to keep the track record of all the entity involved in it. Materials and Methods: Therefore to overcome with the problem the need raised to develop the framework for the maintenance of the project and for the automation testing. Project management framework provides an architecture which supports in managing the project by marinating the records of entire requirements, the test cases that were created for testing each unit of the software, defect raised from the past years. So through this the quality of the project can be maintained. Results: Automation framework provides the architecture which supports the development and implementation of the automation test script for the software testing process. Conclusion: For implementing project management framework the product of HP that is Application Lifecycle management is used which provides central repository to maintain the project.

  12. Which Type of Project Manager are You?

    DEFF Research Database (Denmark)

    2017-01-01

    Which type of project manager best describes you — are you a prophet, gambler, expert or executor? Take this twelve-question quiz to find out right now. There are no wrong answers, but the result may surprise you — and understanding your personal strength can help guide your career and project...

  13. Electronic Resources Management Project Presentation 2012

    KAUST Repository

    Ramli, Rindra M.

    2012-11-05

    This presentation describes the electronic resources management project undertaken by the KAUST library. The objectives of this project is to migrate information from MS Sharepoint to Millennium ERM module. One of the advantages of this migration is to consolidate all electronic resources into a single and centralized location. This would allow for better information sharing among library staff.

  14. Waste management project technical baseline description

    International Nuclear Information System (INIS)

    Sederburg, J.P.

    1997-01-01

    A systems engineering approach has been taken to describe the technical baseline under which the Waste Management Project is currently operating. The document contains a mission analysis, function analysis, requirement analysis, interface definitions, alternative analysis, system definition, documentation requirements, implementation definitions, and discussion of uncertainties facing the Project

  15. Graduate Student Project: Employer Operations Management Analysis

    Science.gov (United States)

    Fish, Lynn A.

    2008-01-01

    Part-time graduate students at an Association to Advance Collegiate Schools of Business-accredited college complete a unique project by applying operations management concepts to their current employer. More than 92% of 368 graduates indicated that this experiential project was a positive learning experience, and results show a positive impact on…

  16. The impact of sustainability on project management

    NARCIS (Netherlands)

    Adri Köhler; Gilbert Gilbert Silvius; Jasper van den Brink

    2011-01-01

    Chapter 11 in The Project as a Social System: Asia-Pacific Perspectives on Project Management. Sustainability is one of the most important challenges of our time. How can we develop prosperity without compromising the life of future generations? Companies are integrating ideas of sustainability in

  17. The impact of sustainability on project management

    NARCIS (Netherlands)

    Adri Köhler; Jasper van den Brink; Gilbert Gilbert Silvius

    2012-01-01

    Full text via link Chapter 11 in The Project as a Social System: Asia-Pacific Perspectives on Project Management Sustainability is one of the most important challenges of our time. How can we develop prosperity without compromising the life of future generations? Companies are integrating ideas of

  18. Decommissioning project management unit started its activities

    International Nuclear Information System (INIS)

    Medeliene, D.

    2002-01-01

    The Decommissioning Project Management Unit team comprises western experts as well as experts from INPP Decommissioning Service who all work as a single team. The DPMU will develop the Final Decommissioning Plan and a more detailed Decommissioning Project, which will describe how the plant will be removed from service and safely decommissioned

  19. Environmental performance management

    International Nuclear Information System (INIS)

    Kwant, J.W.H.; Grant, R.O.H.

    1991-01-01

    This paper describes the environmental programme developed by Shell U.K. Exploration and Production (EXPRO) aiming at a continuous improvement of its environmental performance. The company operates a total of 33 platforms in the North Sea and has 3 land based gas treatment plants. This paper, therefore, relates mainly to the offshore environment. The programme is driven by adopting a goal setting policy. The plan was initiated mid 1990 when an inventory was made of all gaseous emissions, liquid effluents and solid waste discharges of EXPRO's operations during 1989. This baseline was used to identify the largest waste steams and to set priorities for the subsequent improvement programme. Areas for improvement are: atmospheric emissions from venting, flaring and the use of Freons and Halons, the use of Oil Based Mud (OBM), produced water and the disposal of industrial waste. The programme has gained momentum and targets have been set

  20. The Waste Isolation Pilot Plant (WIPP) integrated project management system

    International Nuclear Information System (INIS)

    Olona, D.; Sala, D.

    1993-01-01

    The Waste Isolation Pilot Plant (WIPP), located 26 miles east of Carlsbad, New Mexico, is a research and development project of the Department of Energy (DOE), tasked with the mission of demonstrating the safe disposal of transuranic (TRU) radioactive wastes. This unique project was authorized by Congress in 1979 in response to the national need for long-term, safe methods for disposing of radioactive by-products from our national defense programs. The WIPP was originally established in December of 1979, by Public Law 96-164, DOE National Security and Military Applications of Nuclear Energy Authorization Act of 1980. Since the inception of the WIPP Project, work has continued to prepare the facility to receive TRU wastes. Studies continue to be conducted to demonstrate the safety of the WIPP facility in accordance with federal and state laws, state agreements, environmental regulations, and DOE Orders. The objectives of implementing an integrated project management system are to assure compliance with all regulatory and federal regulations, identify areas of concern, provide justification for funding, provide a management tool for control of program workscope, and establish a project baseline from which accountability and performance will be assessed. Program management and project controls are essential for the success of the WIPP Project. The WIPP has developed an integrated project management system to establish the process for the control of the program which has an expected total dollar value of $2B over the ten-year period from 1990-2000. The implementation of this project management system was motivated by the regulatory requirements of the project, the highly public environment in which the project takes place, limited funding and resources, and the dynamic nature of the project. Specific areas to be addressed in this paper include strategic planning, project organization, planning and scheduling, fiscal planning, and project monitoring and reporting

  1. The analysis of MS Project Server platform for managing of human resources in multiproject environment

    OpenAIRE

    Kadunc, Boštjan

    2009-01-01

    Effective project management requires qualified project managers, who must have complete control over their projects, so they can perform fluently. For easier and more effective project management, we can use various software solutions. In my graduation thesis I focused on working with resources - detecting and resolving their over-allocation. For their regulation I have used Microsoft Office Project Professional 2007 in connection with Microsoft Office Project Server 2007. My goal wa...

  2. Management of delayed nuclear power plant projects

    International Nuclear Information System (INIS)

    2005-01-01

    The IAEA assists the management of organizations responsible for Nuclear Power Plant Projects with significant delays with respect to the originally scheduled commercial operation. Several Member States have Nuclear Power Plant Projects with delays of five or more years with respect to the originally scheduled commercial operation. The degree of conformance with original construction schedules shows large variations due to several issues, including financial, economic and public opinion factors. Solving the special difficulties related with a delayed NPP project is problematic and dependent on the particular country situation. However it is not regarded as an isolated national problem but as a significant issue with a number of difficulties shared by several Member States. The IAEA collects information and supports the management of delayed NPP projects by identifying main common issues, gathering available experience and addressing specific needs. On this background the IAEA is in the position to provide unique impartial assistance based upon best international practices. This enables Member States to maintain readiness for resuming the project construction when the conditions permit and to strengthen management's abilities for the completion of the project. The IAEA's service is tailored to the needs and requirements of the requesting organization, implemented on-site by international experts and addresses areas such as project control measures, human resources, updating to technological and regulatory requirements, project data, nuclear safety review, physical protection and nuclear security and preparation to resume project construction and operation

  3. Conflict Approaches of Effective Project Manager in the Upstream Sector of Indonesian Oil & Gas Industry

    OpenAIRE

    Adhi Cahyono; Yanki Hartijasti

    2012-01-01

    Conflict can be functional or dysfunctional to the organization’s performance. This study focused on the relationship between conflict approaches implemented by the project manager based on project team member’s perception on the effectiveness of the project manager in managing project’s conflict. Questionnaires were modified from Barker et al. (1988) to measure conflict management approaches and outcomes of managing project conflict. Data were gathered from 57 respondents w...

  4. The Human Element of Project Management

    Science.gov (United States)

    Gillard, Sharlett

    2017-01-01

    Much research and dialogue have been published about project management. Studies have been conducted regarding the impact of size, member location, gender composition, cross-functional structure, stakeholder influence, confidence issues, technology usage, management style, generational differences, technical expertise vs. people skills, and a…

  5. Project-based organizing and strategic management

    DEFF Research Database (Denmark)

    very different industries such as management consulting, engineering or entertainment. Contributors analyze PBOs as firms, units or networks of firms set up to complete a specific assignment, as well as address the evolution from traditional operations-driven project management, to the strategic role...

  6. Spent Nuclear Fuel Project Document Management Plan

    International Nuclear Information System (INIS)

    Connor, M.D.; Harizison, G.L.; Rice, W.C.

    1995-12-01

    The SNF Project Document Management Plan identifies and describes the currently available systems and processes for implementing and maintaining an effective document control and records management program. This program governs the methods by which documents are generated, released, distributed, maintained current, retired, and ultimately disposed

  7. COORDINATES OF A RISK MANAGEMENT PROJECT

    OpenAIRE

    ALEXANDRU OLTEANU; MĂDĂLINA ANTOANETA RĂDOI

    2013-01-01

    High risk – high benefit: a well-known correlation both in the economic field and in the day-to-day life. Another correlation, on which this article is based: large project – numerous participants – increased risks and other malfunctions. The risk management concept is challenged by those projects and is forced to find the most adequate “customized” ways for each project at its turn. In this respect, the assessment of management has followed the trend of the last three decades, marked by movi...

  8. Environmental Management Performance Report for December 1999

    Energy Technology Data Exchange (ETDEWEB)

    EDER, D.M.

    2000-02-16

    The purpose of the Environmental Management Performance Report (EMPR) is to provide the Department of Energy Richland Operations Office's (DOE-RL's) report of Hanford's Environmental Management (EM) performance by: U. S. Department of Energy, Richland Operations Office, Project Hanford Management Contract (PHMC) through Fluor Hanford, Inc. (FHI) and its subcontractors, Environmental Restoration Contract through Bechtel Hanford, Inc. (BHI), and its subcontractors, and Pacific Northwest National Laboratories (PNNL) for EM and EM Science and Technology (S&T) Mission. This report is a monthly publication that summarizes EM Site performance under RL Operations Office. It is organized by the four sections listed above, with each section containing an Executive Summary and Area Performance Summaries. A listing of what is contained in the sections can be found in the Table of Contents.

  9. Environmental Management Performance Report April 2000

    Energy Technology Data Exchange (ETDEWEB)

    EDER, D.M.

    2000-04-01

    The purpose of the Environmental Management Performance Report (EMPR) is to provide the Department of Energy Richland Operations Office's (DOE-RL's) report of Hanford's Environmental Management (EM) performance by: Project Hanford Management Contract (PHMC) through Fluor Hanford, Inc. (FHI) and its subcontractors; Environmental Restoration Contract through Bechtel Hanford, Inc. (BHI), and its subcontractors; Pacific Northwest National Laboratories (PNNL) for EM and EM Science and Technology (S and T) Mission; and Office of Safety Regulation of the TWRS Privatization Contractor. This report is a monthly publication that summarizes EM Site performance under RL Operations Office. It is organized by the four sections listed above, with each section containing an Executive Summary and Area Performance Summaries.

  10. Environmental Management Performance Report November 2000

    Energy Technology Data Exchange (ETDEWEB)

    EDER, D.M.

    2000-11-01

    The purpose of the Environmental Management Performance Report (EMPR) is to provide the Department of Energy Richland Operations Office's (DOE-RL's) report of Hanford's Environmental Management (EM) performance by: Project Hanford Management Contract (PHMC) through Fluor Hanford, Inc. (FH) and its subcontractors; Environmental Restoration Contract through Bechtel Hanford, Inc. (BHI), and its subcontractors; Pacific Northwest National Laboratories (PNNL) for Science and Technology support to the EM Mission; and Office of Safety Regulation of the TWRS Privatization Contractor. This report is a monthly publication that summarizes EM Site performance under RL Operations Office. It is organized by the four sections listed above, with each section containing an Executive Summary and Area Performance Summaries. A glossary of terms is provided at the end of this report for reference purposes.

  11. Environmental Management Performance Report May 2000

    International Nuclear Information System (INIS)

    EDER, D.M.

    2000-01-01

    The purpose of this report is to provide the Department of Energy Richland Operations Office (DOE-FU) a report of the Project Hanford Management Contractors' (PHMC)' Environmental Management (EM) performance by Fluor Hanford (FH) and its subcontractors. This report is a monthly publication that summarizes the PHMC EM performance. In addition, it includes some PHMC-level data not detailed elsewhere in the report. Section A, Executive Summary, provides an executive level summary of the cost, schedule, and technical performance described in this report. It summarizes performance for the period covered, highlights areas worthy of management attention, and provides a forward look to some of the upcoming key performance activities as extracted from the PHMC baseline. The remaining sections provide detailed performance data relative to each individual Project (e.g., Waste Management, Spent Nuclear Fuels, etc.), in support of Section A of the report. A glossary of terms is provided at the end of this report for reference purposes. Unless otherwise noted, the Safety, Conduct of Operations, Metrics, and Cost/Schedule data contained herein is as of March 31, 2000. All other information is updated as noted

  12. Environmental Management Performance Report May 2000

    Energy Technology Data Exchange (ETDEWEB)

    EDER, D.M.

    2000-05-01

    The purpose of this report is to provide the Department of Energy Richland Operations Office (DOE-FU) a report of the Project Hanford Management Contractors' (PHMC)' Environmental Management (EM) performance by Fluor Hanford (FH) and its subcontractors. This report is a monthly publication that summarizes the PHMC EM performance. In addition, it includes some PHMC-level data not detailed elsewhere in the report. Section A, Executive Summary, provides an executive level summary of the cost, schedule, and technical performance described in this report. It summarizes performance for the period covered, highlights areas worthy of management attention, and provides a forward look to some of the upcoming key performance activities as extracted from the PHMC baseline. The remaining sections provide detailed performance data relative to each individual Project (e.g., Waste Management, Spent Nuclear Fuels, etc.), in support of Section A of the report. A glossary of terms is provided at the end of this report for reference purposes. Unless otherwise noted, the Safety, Conduct of Operations, Metrics, and Cost/Schedule data contained herein is as of March 31, 2000. All other information is updated as noted.

  13. Project management of life-science research projects: project characteristics, challenges and training needs.

    Science.gov (United States)

    Beukers, Margot W

    2011-02-01

    Thirty-four project managers of life-science research projects were interviewed to investigate the characteristics of their projects, the challenges they faced and their training requirements. A set of ten discriminating parameters were identified based on four project categories: contract research, development, discovery and call-based projects--projects set up to address research questions defined in a call for proposals. The major challenges these project managers are faced with relate to project members, leadership without authority and a lack of commitment from the respective organization. Two-thirds of the project managers indicated that they would be interested in receiving additional training, mostly on people-oriented, soft skills. The training programs that are currently on offer, however, do not meet their needs. Copyright © 2010 Elsevier Ltd. All rights reserved.

  14. When Serious Project Management is a Critical Business Requirement

    Science.gov (United States)

    Jansma, P. A.; Gibby, L.; Chambers, C.; Joines, J.; Egger, R.

    2000-01-01

    When serious project management is a critical business requirement, project managers need to integrate cost, schedule and technical scope of work across the project, and apply earned value management (EVM).

  15. Using facilitative skills in project management

    DEFF Research Database (Denmark)

    Rasmussen, Lauge Baungaard; Hansen, Mette Sanne; Jacobsen, Peter

    2013-01-01

    Project management can be seen as a profession, discipline and conceptual framework. It has been developed from different fields, including military engineering, mechanical engineering, social sciences and construction. During recent decades, there has been a number of challenges as to its efficacy...... cooperation, mediated by interconnected and diversified systems, is becoming more and more common. These relatively new forms of interaction imply new demands on skills and methods facilitating project cooperation within and among various organizations. Given the pervasiveness of these demands, project...... managers are frequently finding themselves in situations where using facilitating skills is not an option, but a requirement. Facilitation is to be viewed as a process of ‘obstetric’ aid to meet the challenges of coping with the changing conditions for project management described briefly above...

  16. Development of advanced JGIS considering qualify management and project management

    International Nuclear Information System (INIS)

    Kawachi, Susumu; Ohi, Takao; Kawamura, Makoto; Ishihara, Yoshinao; Ebina, Takanori

    2008-03-01

    A system for managing and integrating the technical information of R and D was developed (JGIS: JAEA Geological Disposal Information Integration System). The subjects are to improve the usability as the system and the usability to record the information and the data in order to display the function of the system sufficiently and in order to enable the practical use of the system. In this study the aims are to display the function of JGIS and to enable the researchers as the users to recognize the significance of using JGIS. We built the conceptual design in order to implement the function of quality management and project management to JGIS. We considered that researchers could access the portal site of the research projects which were set as the WBS (Work Breakdown Structure) items and could confirm which WBS item the research project belonged to in the whole plan. We also considered that the research projects could be managed by using the conformity assessment sheets which were adopted for the quality management. The appendix contains the example of application of real projects to JGIS and the user's manual of JGIS (Example of a study of potential impact of natural phenomena). We demonstrated that researchers could confirm which WBS item the research project related to in JGIS and could manage the quality of the research projects by using the conformity assessment sheets in JGIS. (author)

  17. A Communications Approach to Teaching Project Management

    DEFF Research Database (Denmark)

    Kampf, Constance Elizabeth

    2012-01-01

    in the Bachelor of Marketing and Management Communication at Aarhus University is examined and analyzed. The presence of the three Design Science Research Cycles combined with both process and product, highlights the critical role of communication in both understanding Project Management and applying Design...... to both frame the learners’ audience for Project Management Writing assignments, and to provide a concrete organizational context to aid in communication practices such as stakeholder analysis, and the development of a critical internal monitor for quality in the learner’s mind. The relevance of Design...

  18. 5 CFR 430.102 - Performance management.

    Science.gov (United States)

    2010-01-01

    ... 5 Administrative Personnel 1 2010-01-01 2010-01-01 false Performance management. 430.102 Section 430.102 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PERFORMANCE MANAGEMENT Performance Management § 430.102 Performance management. (a) Performance management is the...

  19. Next Generation Nuclear Plant Project Preliminary Project Management Plan

    International Nuclear Information System (INIS)

    Dennis J. Harrell

    2006-01-01

    This draft preliminary project management plan presents the conceptual framework for the Next Generation Nuclear Plant (NGNP) Project, consistent with the authorization in the Energy Policy Act of 2005. In developing this plan, the Idaho National Laboratory has considered three fundamental project planning options that are summarized in the following section. Each of these planning options is literally compliant with the Energy Policy Act of 2005, but each emphasizes different approaches to technology development risks, design, licensing and construction risks, and to the extent of commercialization support provided to the industry. The primary focus of this draft preliminary project management plan is to identify those activities important to Critical Decision-1, at which point a decision on proceeding with the NGNP Project can be made. The conceptual project framework described herein is necessary to establish the scope and priorities for the technology development activities. The framework includes: A reference NGNP prototype concept based on what is judged to be the lowest risk technology development that would achieve the needed commercial functional requirements to provide an economically competitive nuclear heat source and hydrogen production capability. A high-level schedule logic for design, construction, licensing, and acceptance testing. This schedule logic also includes an operational shakedown period that provides proof-of-principle to establish the basis for commercialization decisions by end-users. An assessment of current technology development plans to support Critical Decision-1 and overall project progress. The most important technical and programmatic uncertainties (risks) are evaluated, and potential mitigation strategies are identified so that the technology development plans may be modified as required to support ongoing project development. A rough-order-of-magnitude cost evaluation that provides an initial basis for budget planning. This

  20. Application of PRINCE2 Project Management Methodology

    Directory of Open Access Journals (Sweden)

    Vaníčková Radka

    2017-09-01

    Full Text Available The methodology describes the principle of setting a project in PRINCE2 project management. The main aim of the paper is to implement PRINCE2 methodology to be used in an enterprise in the service industry. A partial aim is to choose a supplier of the project among new travel guides. The result of the project activity is a sight-seeing tour/service more attractive for customers in the tourism industry and a possible choice of new job opportunities. The added value of the article is the description of applying the principles, processes and topics of PRINCE2 project management so that they might be used in the field.

  1. Strategic leadership of portfolio and project management

    CERN Document Server

    Kloppenborg, Timothy J

    2014-01-01

    As an executive in today's economy, your organization may have limited resources and bench strength. How can you and other leaders make the most of your company's assets? This book will instruct you and your leadership teams on implementing strategy through identifying, selecting, prioritizing, resourcing, and governing an optimal combination of projects and other work. Inside, you'll learn how to sponsor every project stage, as well as instruct your project managers and direct reports to follow your lead. Detailed advice is given for project management competency on utilizing input from customers, employees, and processes. Much of your organization's work is probably dependent on information technology and understanding and using information technology as a strategic weapon, and with this book, you'll learn how your organization can become competitive and how to effectively implement smart business strategies. This book outlines how these portfolio and project decisions have to be made based on both qualitat...

  2. Managing uncertainty for sustainability of complex projects

    DEFF Research Database (Denmark)

    Brink, Tove

    2017-01-01

    Purpose – The purpose of this paper is to reveal how management of uncertainty can enable sustainability of complex projects. Design/methodology/approach – The research was conducted from June 2014 to May 2015 using a qualitative deductive approach among operation and maintenance actors in offshore...... wind farms. The research contains a focus group interview with 11 companies, 20 individual interviews and a seminar presenting preliminary findings with 60 participants. Findings – The findings reveal the need for management of uncertainty through two different paths. First, project management needs...... to join efforts. Research limitations/implications – Further research is needed to reveal the generalisability of the findings in other complex project contexts containing “unknown unknowns”. Practical implications – The research leads to the development of a tool for uncertainty management...

  3. Management of delayed nuclear power plant projects

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-09-01

    According to the available information at the IAEA PRIS (Power Reactor Information System) at the end of 1998 there were more than 40 nuclear power plant projects with delays of five or more years with respect to the originally scheduled commercial operation. The degree of conformance with original construction schedules showed large variations due to several issues, including financial, economic and public opinion factors. Taking into account the number of projects with several years delay in their original schedules, it was considered useful to identify the subject areas where exchange of experience among Member States would be mutually beneficial in identification of problems and development of guidance for successful management of the completion of these delayed projects. A joint programme of the IAEA Departments of Nuclear Energy (Nuclear Power Engineering Section) and Technical Co-operation (Europe Section, with additional support from the Latin America and West Asia Sections) was set up during the period 1997-1998. The specific aim of the programme was to provide assistance in the management of delayed nuclear power plants regarding measures to maintain readiness for resuming the project implementation schedule when the conditions permit. The integration of IAEA interdepartmental resources enabled the participation of 53 experts from 14 Member States resulting in a wider exchange of experience and dissemination of guidance. Under the framework of the joint programme, senior managers directly responsible for delayed nuclear power plant projects identified several issues or problem areas that needed to be addressed and guidance on management be provided. A work plan for the development of several working documents, addressing the different issues, was established. Subsequently these documents were merged into a single one to produce the present publication. This publication provides information and practical examples on necessary management actions to preserve

  4. Management of delayed nuclear power plant projects

    International Nuclear Information System (INIS)

    1999-09-01

    According to the available information at the IAEA PRIS (Power Reactor Information System) at the end of 1998 there were more than 40 nuclear power plant projects with delays of five or more years with respect to the originally scheduled commercial operation. The degree of conformance with original construction schedules showed large variations due to several issues, including financial, economic and public opinion factors. Taking into account the number of projects with several years delay in their original schedules, it was considered useful to identify the subject areas where exchange of experience among Member States would be mutually beneficial in identification of problems and development of guidance for successful management of the completion of these delayed projects. A joint programme of the IAEA Departments of Nuclear Energy (Nuclear Power Engineering Section) and Technical Co-operation (Europe Section, with additional support from the Latin America and West Asia Sections) was set up during the period 1997-1998. The specific aim of the programme was to provide assistance in the management of delayed nuclear power plants regarding measures to maintain readiness for resuming the project implementation schedule when the conditions permit. The integration of IAEA interdepartmental resources enabled the participation of 53 experts from 14 Member States resulting in a wider exchange of experience and dissemination of guidance. Under the framework of the joint programme, senior managers directly responsible for delayed nuclear power plant projects identified several issues or problem areas that needed to be addressed and guidance on management be provided. A work plan for the development of several working documents, addressing the different issues, was established. Subsequently these documents were merged into a single one to produce the present publication. This publication provides information and practical examples on necessary management actions to preserve

  5. Knowledge Management in the Neutronics Group of CAREM Project

    International Nuclear Information System (INIS)

    Torres, L.; Lopasso, E.

    2016-01-01

    Full text: An analysis of the Neutronics Group of CAREM25 project was performed in order to plan for the gradual implementation of knowledge management. The group structure, performed tasks and the way these tasks are linked together were studied. Staff functions within the group, profiles of each position and the training and education of human resources were also analyzed. (author

  6. Building a Sustainable Project Management Capacity in Cyprus

    Science.gov (United States)

    Kelly, Steven J.; Esque, Timm J.; Novak, M. Mari; Cermakova, Anna

    2012-01-01

    The performance-driven project management program examined in this article was funded to support a variety of technical assistance efforts designed to strengthen the performance of small and medium enterprises in the Turkish Cypriot community in Cyprus. The customized program combined progressive workshops with hands-on and distance coaching by…

  7. Critical thinking of classical view of project management

    Institute of Scientific and Technical Information of China (English)

    祁亮

    2015-01-01

    Synopsis:This essay argues that the classic view has to be updated to meet the new demands. It is found out that the scientific manage-ment believes that there are a few essential roles of managers,including planning,organizing,leading,and controlling. There are many impor-tant aspects which lead to the complexity of the modern project management such as globalization and technology. There are many things that are not compatible between the current projects and the traditional theory. It is also considerable to realize that sometimes scholars disagree with each other about the prevalence of complicated projects. However,even if the classic project management theory is useful in certain cases, there is no doubt that such theory demands significant improvements to better suit the current world. Therefore,it is significant that the classic project management theory be upgraded. In order to improve the performances of the project management,it is recommended that stakeholder theory is promoted,decentralized decision making is allowed,and adoption of new technology is recommended.

  8. APPLICATION OF PROJECT MANAGEMENT APPROACHES AT A SMALL BUSINESSES ENTERPRISES

    Directory of Open Access Journals (Sweden)

    Sergey V. Rajewski

    2016-01-01

    Full Text Available This article discusses the types of organizational structures of project management and their application in project management in small and medium-sized enterprises. Among the approaches and methods to organize projects emphasizing project management as part of the existing functional structure of the enterprise. Analyzed the most relevant organizational tools of project management in small business: a network schedule; matrix distribution of administrative and management tasks of the project; schedule of the project plan; information and technological methods and models used in the process of project management; software applications for project management, used in the sphere of small business.

  9. The study of the risk management model of construction project

    International Nuclear Information System (INIS)

    Jiang Bo; Feng Yanping; Liu Changbin

    2010-01-01

    The paper first analyzed the development of the risk management of construction project and the risk management processes, and then briefly introduced the risk management experience of foreign project management. From the project management by objectives point of view, the greatest risk came from the lack of clarity of the objectives in the project management, which led to the project's risk emergence. In the analysis of the principles of the project objectives identification and risk allocation, the paper set up a project management model which insurance companies involved in the whole process of the project management, and simply analyzed the roles of insurance company at last. (authors)

  10. Waste management for the Shippingport Station Decommissioning Project

    International Nuclear Information System (INIS)

    Mullee, G.R.; Schulmeister, A.R.

    1987-01-01

    The Shippingport Station Decommissioning Project (SSDP) is being performed by the US Department of Energy (DOE) with the objectives of placing the station in a radiologically safe condition, demonstrating safe and cost effective dismantlement and providing useful data for future decommissioning projects. This paper describes the development of the Waste Management Plan which is being used for the accomplishment of the SSDP. Significant aspects of the Plan are described, such as the use of a process control and inventory system. The current status of waste management activities is reported. It is concluded that SSDP has some unique aspects which will provide useful information for future decommissioning projects

  11. Managing Excellence in Sports Performance.

    Science.gov (United States)

    Lyle, John W. B.

    1997-01-01

    Conceptualizes excellence in sports performance and suggests that there is a failure to distinguish between community recreation and performance sports as well as lack of knowledge about talent identification. Proposes a structure for management and investment in education and training in the field. (SK)

  12. Antecedents of Public Performance Management

    DEFF Research Database (Denmark)

    Hansen, Morten Balle; Høgedahl, Laust Kristian; Opstrup, Niels

    on performance, the extent to which incentives where related to performance indicators and the problem of measuring performance of inter-organizational cooperation. Using descriptive statistics and multivariate regression analysis our preliminary findings indicate that both the functional tasks...... of the organization and the hierarchical level of the manager as well as the gender and education background of the manager has some significant impact on the perceived utility of the PM system, although the relations are rather weak. We discuss our findings and their implications for PM theory, PM practice as well...

  13. Alternative techniques for environmental project management

    International Nuclear Information System (INIS)

    Reeves, S.

    1994-01-01

    Beginning in the late 1970s and early 1980s, increased regulation and recognition of ground water as an important natural resource led industry to address subsurface contamination at many sites. This caused the industry's dependence on environmental consultants to increase drastically. Initially, the accepted practice for addressing environmental concerns was to rely upon consultants to determine appropriate work scope, budgets, procedures and regulatory interaction. While significant advances have been made in technology and consulting services, improvement in project management and cost containment have been limited. In order to effectively manage environmental projects, it is imperative that business risks and standardized project management practices be factored into environmental solutions. A standardized environmental project management program was developed and applied to projects at petroleum marketing facilities throughout the United States. Following development and implementation, detailed studies were conducted to measure the value of standardization in reducing costs and enhancing efficiencies. The results indicate significant improvement in both reducing project costs and in enhancing the efficiency of consultants

  14. Technology Management on Large Construction Projects

    DEFF Research Database (Denmark)

    Bonke, Sten

    The aim of this text is to discuss and to develop the concept of technology management in relation to the empirical field of construction projects. In the first of the two main sections central theories and their derived assertions concerning technology management criteria are summed up...... Fixed Link construction project. Finally on this basis the concluding remarks are pointing to the main theoretical problems and their practical implementations for the introduction of a technology management discipline in construction....... in a schematic theoretical framework. Hereafter the general characteristics of construction are examined from the point of view of serving as an empirical field for technology management analysis. In the second section the technology management theme is associated with the empirical properties of the Great Belt...

  15. COORDINATES OF A RISK MANAGEMENT PROJECT

    Directory of Open Access Journals (Sweden)

    ALEXANDRU OLTEANU

    2013-05-01

    Full Text Available High risk – high benefit: a well-known correlation both in the economic field and in the day-to-day life. Another correlation, on which this article is based: large project – numerous participants – increased risks and other malfunctions. The risk management concept is challenged by those projects and is forced to find the most adequate “customized” ways for each project at its turn. In this respect, the assessment of management has followed the trend of the last three decades, marked by moving of management profit analysis by risk intermediation, respectively the transition from managing profit to risk-return relationship management. Such trend assumes the obligation of participants to identify objectives and expected benefits of the project on the basis of the strategies laid-down, the elements of risk management policies, in conjunction with the indication of the most negative scenarios which they may provide. This activity must take into consideration the process of obtaining and combining human, financial, physical and information resources in order to accomplish the primary goal of the proposed and wanted project by a certain segment of population. Project participants are directed to evaluate their own activities in terms of revenues and risks from the business access, opportunity, operating mode, as well as the limitations and boundaries on certain sides of activity. The paper focuses on the analysis and evaluation of incomes and risks, on simulations to streamline the activities and the determination of the optimal model of project choice. Also, the paper treats the risks that can be taken over by the sponsors, especially those related to implied guaranties, even implied guaranties.

  16. HANDOVER MANAGEABILITY AND PERFORMANCE MODELING IN

    African Journals Online (AJOL)

    SOFTLINKS DIGITAL

    Developed software for project management rely heavily on collecting metrics to provide the progress ... the scope of the executing project. ..... in project planning and reflection. [2]. .... Data mining for unusual movements in temporal data.

  17. Effect of Managers on Public Service Performance

    DEFF Research Database (Denmark)

    Mikkelsen, Maria Falk

    This report provides an overview of the PhD dissertation “Effects of Managers on Public Service Performance” carried out at the Department of Political Science, Aarhus University and SFI – The Danish National Centre for Social Research. The dissertation is part of the research project “School...... Management, Teaching, and Student Performance” supported by the Danish Strategic Research Council (now Innovation Fund Denmark) and headed by professor Søren Winter. The dissertation explores the effects of managers on public service performance. By combining theoretical insights and research designs from......?”, “How can we improve organizational performance?”, and “How can we measure public service performance?” The setting for the dissertation is Danish middle schools (folkeskoler). The education system is generally considered an important service area as it affects later life outcomes of individual children...

  18. LINKING PROJECTS TO BUSINESS STRATEGY THROUGH PROJECT PORTFOLIO MANAGEMENT

    Directory of Open Access Journals (Sweden)

    A.J. Buys

    2012-01-01

    Full Text Available

    ENGLISH ABSTRACT: In many organisations, a chasm exists between the development of strategy and its successful implementation. Failure to cross this chasm may ultimately result in strategy failure and the loss of competitive advantage, profits, and employment. Project Portfolio Management (PPM is theorised as a management methodology that links a portfolio of projects to the business strategy. However, current literature lacks empirical evidence of the levels of employment, functionality, and success of the Project Portfolio Management approach in South Africa. A survey of respondents in 32 technology organisations was used to analyze the reasons for the following: strategy implementation and project delivery failure in South African technology organisations; the South African situation regarding the chasm that exists in many organisations between strategy development and successful strategy implementation; and the extent to which – and with what success – Project Portfolio Management is employed in South African technology organisations.

    AFRIKAANSE OPSOMMING: In baie organisasies bestaan daar ’n gaping tussen strategie-ontwikkeling en suksesvolle strategie-implementering. Die onvermoë om die gaping te oorbrug sal uiteindelik lei tot strategiefaling en die verlies van mededingende voordeel, winste, en werksgeleenthede. Projekportefeuljebestuur (PPB word voorgehou as ’n bestuursmetodologie wat ’n portefeulje van projekte koppel aan die besigheidstrategie. Bestaande literatuur gaan egter mank aan empiriese bewyse ten opsigte van die vlakke van indiensneming, funksionaliteit, en sukses van die Projekportefeuljebestuursbenadering in Suid-Afrika. ’n Opname van respondente in 32 tegnologie-organisasies is gebruik om die volgende aspekte te ondersoek: die redes vir falings in strategie-implementering en projekaflewering in Suid-Afrikaanse tegnologie-organisasies; die Suid-Afrikaanse situasie rakende die gaping wat bestaan tussen

  19. The ComSoc guide to managing telecommunications projects

    CERN Document Server

    Desmond, Celia

    2010-01-01

    "This pocket guide provides an overview of the telecommunications environment as it has evolved over the past few years, illustrating the need for project management, the significance of project success to the companies, and the application of key project management processes within the telecom environment. Topics covered include: scope management, time management, cost management, procurement management, risk management, communications, quality, human resources, and Integration. It offers professionals a brief and accessible guide to managing telecommunication projects in the 21st century"--

  20. MANAGING THE INTERACTION OF RESOURCE DISTRIBUTION IN PROJECT MANAGEMENT OF IMPLEMENTATION AND FUNCTIONING OF EMERGENCY CALL SYSTEMS

    Directory of Open Access Journals (Sweden)

    Дмитро Сергійович КОБИЛКІН

    2016-02-01

    Full Text Available There have been proposed to use a mobile module "Resources manager" and its component model – scheme for managing the distribution of resources during the project management of implementation and functioning of System 112 in Ukraine. Are described the formalized tasks of performance the processes of managing the model – scheme at all stages of the projects life cycle. Also is developed the model – scheme interaction the blocks of the mobile module of resource management at the System 112 project. It describes the step by step interaction of blocks project management with the project data for successful project implementation and obtaining a product of the project, pointing out the environmental impact of the project on each of the project blocks. The conclusions about the expediency and efficiency of implementation of model – scheme in conditions of managing the emergency call systems at a single number were made.

  1. Identification of coordination factors affecting building projects performance

    Directory of Open Access Journals (Sweden)

    Wesam Salah Alaloul

    2016-09-01

    Full Text Available Construction projects performance requires improvement to fulfil the complexity of the stakeholders’ needs and expectations. Coordination process is proposed as an efficient solution for weak performance of construction projects. Therefore, coordination factors are vital in ensuring a successful implementation of all project phases. This study aimed to identify and prioritise coordination factors that influence the performance of building projects in Malaysian context. A vast body of literature on coordination process was reviewed and resulted in 53 coordination factor. Three rounds of Delphi technique were conducted. The most effective coordination factors were ranked based on the Relative Importance Index (RII such as Scheduling (RII = 0.97, Quality assurance plan (RII = 0.93, and all parties’ participation in plans (RII = 0.89. These coordination factors have fulfilled the research gap and provided better management and higher performance for project parties. The results offer insightful perspectives to define the most effective coordination factors, for addressing the dependency between project tasks and the parties to enhance project performance.

  2. Quality Management in Project Management Consulting. A Case Study in an International Consulting Company

    Directory of Open Access Journals (Sweden)

    Eduard-Gabriel Ceptureanu

    2017-02-01

    Full Text Available The present paper addresses quality management from the specific perspective of project management consulting service providers, in the framework of large infrastructure projects. Because of their supposed superiority in knowledge and experience, project management consultants have an ultimate responsibility for the proper implementing of the project. Therefore, quality management in consulting organizations should focus on critical success factors. As there is no consensus yet regarding the most important aspects of the consulting activity on which depend the achievement of the project aims, there is scope for further investigating this subject. Here, the case of a project management consulting organization involved in large infrastructure projects in Romania, Bulgaria, Moldova, Ukraine and Serbia is analyzed. Data collected through a questionnaire-based survey among international consultants and support personnel suggest that factors related to leadership style and communication skills are more closely tied to the success of the project than more technical aspects. The results constitute an empirical evidence of main success factors for specialized consulting services in project management and can be useful in improving business and project performance and achieving business excellence.

  3. Project Management: Essential Skill of Nurse Informaticists.

    Science.gov (United States)

    Sipes, Carolyn

    2016-01-01

    With the evolution of nursing informatics (NI), the list of skills has advanced from the original definition that included 21 competencies to 168 basic competencies identified in the TIGER-based Assessment of Nursing Informatics Competencies (TANIC) and 178 advanced skills in the Nursing Informatics Competency Assessment (NICA) L3/L4 developed by Chamberlain College of Nursing, Nursing Informatics Research Team (NIRT). Of these competencies, project management is one of the most important essentials identified since it impacts all areas of NI skills and provides an organizing framework for processes and projects including skills such as design, planning, implementation, follow-up and evaluation. Examples of job roles that specifically require project management skills as an essential part of the NI functions include management, administration, leadership, faculty, graduate level master's and doctorate practicum courses. But first, better understanding of the NI essential skills is vital before adequate education and training programs can be developed.

  4. New Production Reactor project-management plan

    International Nuclear Information System (INIS)

    McCrosson, F.J.; Hibbard, L.; Buckner, M.R.

    1982-01-01

    This document provides a project management plan for the first phase of a project to design and build a new production reactor (NPR) at SRP. The design of the NPR is based upon proven SRP heavy water reactor design, with several enhancements such as full containment, moderator detritiation, improved cooling, and modernized control rooms and instrumentation. The first phase of the NPR project includes environmental and safety analyses, preparation of the technical data summary and basic data, site studies, engineering studies, and conceptual design. The project management plan was developed by a 14-member task force comprised of representatives from the Technical Division, the Manufacturing Division, the Departmental Engineer's Office, and the Engineering Department

  5. Risk management for independent power projects

    International Nuclear Information System (INIS)

    Owen, J.L.

    1993-01-01

    Independent Power, where electric utilities or other bulk electric power users contract with individual electric power generation facilities to meet their projected long term power needs, has grown dramatically over the past ten years or more. This concept, to contract with Independent Power Producers (IPP), is not a new concept and in fact goes back to the early formation of the electric power industry in this country and worldwide. Successful Risk Management is the foundation for ultimate project completion and operation in fulfilling the expectations of all parties. The primary risks associated with the development of Independent Power projects include: predicting long term fuel availability and cost; predicting long term price for the deliverable of electricity; site selection, site characteristics and permitting; innovative or evolving technology; project execution (design and construction), and; lifetime O ampersand M costs and plant reliability. This paper focuses on the risks inherent in the development of IPPs and addresses the management of these risks

  6. Intelligent Materials Tracking System for Construction Projects Management

    Directory of Open Access Journals (Sweden)

    Narimah Kasim

    2015-05-01

    Full Text Available An essential factor adversely affecting the performance of construction projects is the improper handling of materials during site activities. In addition, paper-based reports are mostly used to record and exchange information related to the material components within the supply chain, which is problematic and inefficient. Generally, technologies (such as wireless systems and RFID are not being adequately used to overcome human errors and are not well integrated with project management systems to make tracking and management of materials easier and faster. Findings from a literature review and surveys showed that there is a lack of positive examples of such tools having been used effectively. Therefore, this research focused on the development of a materials tracking system that integrates RFID-based materials management with resources modelling to improve on-site materials tracking. Rapid prototyping was used to develop the system and testing of the system was carried out to examine the functionality and working appropriately. The proposed system is intended to promote the employment of RFID for automatic materials tracking with integration of resource modelling (Microsoft (R Office Project in the project management system in order to establish which of the tagged components are required resources for certain project tasks. In conclusion, the system provides an automatic and easy tracking method for managing materials during materials delivery and inventory management processes in construction projects.

  7. Non-Profit/Higher Education Project Management Series: Project Management (PM) Foundations

    Science.gov (United States)

    Burgher, Karl E.; Snyder, Michael B.

    2012-01-01

    This is the first in a series of forum articles on applying project management (PM) techniques and tools to the nonprofit sector with a focus on higher education. The authors will begin with a traditional look at project management because they believe that the integration of the tools and the processes associated with PM into many campus offices…

  8. HUBUNGAN KOMPETENSI PROJECT MANAGER TERHADAP KEBERHASILAN PROYEK KONSTRUKSI GEDUNG

    OpenAIRE

    Ida Ayu Ari Brahmantariguna; GAP. Candra Dharmayanti; I W. Yansen

    2016-01-01

    Abstract :One of the factor that influences the achievement of a project success is the role of a project manager. A reliable project manager, who knows his duties as a project leader and has the necessary competency requirements is needed to achieve the success of the project. The competence of a project manager can be measured by three aspects: knowledge, skill and attitude.This research  aims to analyze the relationship between project manager competencies (that measured by three independe...

  9. Cesium legacy safety project management work plan

    International Nuclear Information System (INIS)

    Durham, J.S.

    1998-01-01

    This Management Work Plan (MWP) describes the process flow, quality assurance controls, and the Environment, Safety, and Health requirements of the Cesium Legacy Safety Project. This MWP provides an overview of the project goals and methods for repackaging the non-conforming Type W overpacks and packaging the CsCl powder and pellets. This MWP is not intended to apply to other activities associated with the CsCl Legacy Safety Program (i.e., clean out of South Cell)

  10. IS-ENES project management - lessons learnt

    Science.gov (United States)

    Parinet, Marie; Guglielmo, Francesca; Joussaume, Sylvie

    2017-04-01

    IS-ENES is the distributed e-infrastructure of models, model data and metadata of the European Network for Earth System Modelling (ENES). It has benefitted from two EC FP7 grants and aims towards further European and national funding to achieve sustainability. We highlight here several challenges related to project management that have risen in the course of these two project-phases spanning 8 years. Some challenges are related to the heterogeneity of the activities within IS-ENES, with different groups working on very diverse activities, not necessarily strictly interdependent. An immediate consequence is the need of implementing and setting up in early phases of the project efficient collection and circulation of information to preserve and reinforce the systemic view of the infrastructure as a whole and the pursuit of common goals, including coordinated provision of services. Toward and beyond such common goals, managing IS-ENES, covering both scientific and more strictly management-related aspects, implies a double-paced approach: besides setting up efficient project workflow, there is the need of setting up longer term objectives. This implies, within the project lifetime, to elaborate and implement a coherent organizational (consistent with scientific goals, funding schemes, research and technology landscape) strategy to pursue these goals beyond the project itself. Furthermore, a series of more generic project management challenges will also be listed and can be gathered around 3 main objectives: ease the internal processes in order to optimize the work, anticipate delays and budget issues, and motivate the project teams by ensuring an efficient internal and external communication.

  11. Measurement of Software Project Management Effectiveness

    Science.gov (United States)

    2008-12-01

    factors such as advertisement of project mission, top management support, client consultation, personnel issues, client acceptance, etc. Trouble...and PERT (Program/Project Evaluation and Review Technique) and CPM (Critical Path Analysis) charts are process models, and the development of Gantt...models (such as Gantt, PERT and CPM ) got wide-acceptance in industry, as Fuggetta (2000) pointed out few (if any) of the proposed PMLs and related

  12. Knowledge Management Practice on Construction Project ...

    African Journals Online (AJOL)

    Likewise, the results further indicated 19 benefits of KM practice for improving construction project performance and include: improve project quality, cost and time; practice and process improvement; encourage effective teamwork and innovation; improve the client satisfaction; boost productivity of employees and processes; ...

  13. International Project Management Committee: Overview and Activities

    Science.gov (United States)

    Hoffman, Edward

    2010-01-01

    This slide presentation discusses the purpose and composition of the International Project Management Committee (IMPC). The IMPC was established by members of 15 space agencies, companies and professional organizations. The goal of the committee is to establish a means to share experiences and best practices with space project/program management practitioners at the global level. The space agencies that are involved are: AEB, DLR, ESA, ISRO, JAXA, KARI, and NASA. The industrial and professional organizational members are Comau, COSPAR, PMI, and Thales Alenia Space.

  14. PMP Project Management Professional Exam Study Guide

    CERN Document Server

    Heldman, Kim

    2011-01-01

    Completely updated for the 2011 version of the PMP exam! If you're preparing for the Project Management Professional (PMP) exam, this thorough book is what you need. Not only does it reflect the very latest version of the exam, it is written by popular project management expert Kim Heldman—author of the five previous editions of this top-selling book—and it also includes a CD with practice exams, exam prep software, electronic flashcards, and over two hours of additional audio review. All exam objectives, as well as essential PMP topics, concepts, and key terms are covered.Prepares

  15. Analyzing Project Management Maturity Level in Indonesia

    Directory of Open Access Journals (Sweden)

    Eliot Simangunsong

    2013-05-01

    Full Text Available Normal 0 false false false IN X-NONE X-NONE MicrosoftInternetExplorer4 Project management has been generally known and increasingly used by many organizations to gain competitive advantage. In this context, many studies have proposed maturity models to evaluate how project management knowledge has been deployed effectively and efficiently in organization. As a developing country, Indonesia needs many development projects managed by government and private companies in different industries. Here, a study to assess project management maturity level in Indonesian businesses may bring insight about current business practices, which is important to speed up country development and business sustainability.  Adapting the Project Management Maturity Model (ProMMM, a survey instrument has been developed and applied to professionals from Jakarta and surrounding area.  The result of analysis shows that construction and primary industry have a higher maturity level compare to manufacturing and services.  It is to be noted, however, that the level of project management understanding is low across industries.  This indicates that more quality project management training or certification is required to improve overall project management knowledge in Indonesia. /* Style Definitions */ table.MsoNormalTable {mso-style-name:"Table Normal"; mso-tstyle-rowband-size:0; mso-tstyle-colband-size:0; mso-style-noshow:yes; mso-style-priority:99; mso-style-qformat:yes; mso-style-parent:""; mso-padding-alt:0cm 5.4pt 0cm 5.4pt; mso-para-margin:0cm; mso-para-margin-bottom:.0001pt; mso-pagination:widow-orphan; font-size:11.0pt; font-family:"Calibri","sans-serif"; mso-ascii-font-family:Calibri; mso-ascii-theme-font:minor-latin; mso-fareast-font-family:"Times New Roman"; mso-fareast-theme-font:minor-fareast; mso-hansi-font-family:Calibri; mso-hansi-theme-font:minor-latin; mso-bidi-font-family:"Times New Roman"; mso-bidi-theme-font:minor-bidi;}

  16. A simulation of 'schedule-cost' progress monitoring system in nuclear power project management

    International Nuclear Information System (INIS)

    Song Haitao; Huang Zhongping; Zhang Zemin; Wang Zikai

    2010-01-01

    The objective of project management is to find the optimal balance between progress and cost according to the project requirements. Traditional method always manages progress and cost separately. However, domestic and international experience indicated that the interactions between these two factors are crucial in the project implementation. Modern project managers have to manage and maintain a 'Progress - Cost' joint control framework. Such a model is applied into a sub-project of a nuclear power project using Simulink in this paper. It helps to identify and correct the deviations of the project. Earned Value Management is used by the project manager to quantify the cost of the project and progress of implementation. The budget plan value, actual value, earned value are three important parameters to measure cost and progress of the project. The experimental results illustrated that the method gives a more comprehensive performance evaluation of the project. (authors)

  17. Knowledge Management in Product Development Projects

    International Nuclear Information System (INIS)

    Sheik Muhamad, S.

    2016-01-01

    Full text: Product data management system (PDM) solutions control vast quantities of information generated by engineers during the product development process. They provide vaulting capabilities to control access to shared data,workflow to distribute it, and configured product structures to relate it to product components. Nuclear Malaysia has the desire to have a proper CAD management system and this is achieved with the use of PDM system to manage all their designs throughout the product lifecycle, i.e., for drawing distribution and design change. The type of documents that Nuclear Malaysia manages are CAD files (as generated by CATIA, AUTOCAD), engineering files, reports, project files, documents (WORD, PDF), spreadsheet (EXCEL), bills of material, manufacturing processes and drawings. Besides managing drawings, we also want to control and manage engineering changes (ECO & ECR) in electronic format. (author

  18. Project risk management in complex petrochemical system

    Directory of Open Access Journals (Sweden)

    Kirin Snežana

    2012-01-01

    Full Text Available Investigation of risk in complex industrial systems, as well as evaluation of main factors influencing decision making and implementation process using large petrochemical company as an example, has proved the importance of successful project risk management. This is even more emphasized when analyzing systems with complex structure, i.e. with several organizational units. It has been shown that successful risk management requires modern methods, based on adequate application of statistical analysis methods.

  19. Application of the graded management approach to Battelle's nuclear project

    International Nuclear Information System (INIS)

    Voth, C.B.

    1996-01-01

    Battelle's graded management approach provides an effective and efficient method to perform the Battelle Columbus Laboratories Decommissioning Project (BCLDP). The project is managed by Battelle under their US Nuclear Regulatory Commission (NRC) license but is partially funded by the US Department of Energy (DOE) on a cost-shared basis. Battelle's graded management approach adheres to the regulations and orders governing the BCLDP by the interaction of various plans, procedures, permits, and work instructions. By independent assessment, quality control, and worker training, Battelle has been able to establish a cost-effective approach to performing work and, at the same time, have a controlled checks and balance system to assure the proper safety considerations and project particulars are taken into account

  20. Understanding and Managing Process Interaction in IS Development Projects

    DEFF Research Database (Denmark)

    Bygstad, Bendik; Nielsen, Peter Axel

    2005-01-01

    Increasingly, information systems must be developed and implemented as a part of business change. This is a challenge for the IS project manager, since business change and information systems development usually are performed as separate processes. Thus, there is a need to understand and manage......-technical innovation in a situation where the organisational change process and the IS development process are parallel but incongruent. We also argue that iterative software engineering frameworks are well structured to support process interaction. Finally, we advocate that the IS project manager needs to manage...... the relationship between these two kinds of processes. To understand the interaction between information systems development and planned organisational change we introduce the concept of process interaction. We draw on a longitudinal case study of an IS development project that used an iterative and incremental...

  1. Managing the first nuclear power plant project

    International Nuclear Information System (INIS)

    2007-05-01

    Energy is essential for national development. Nearly every aspect of development - from reducing poverty and raising living standards to improving health care, industrial and agricultural productivity - requires reliable access to modern energy resources. States may have different reasons for considering starting a nuclear power project to achieve their national energy needs, such as: lack of available indigenous energy resources, the desire to reduce dependence upon imported energy, the need to increase the diversity of energy resources and/or mitigation of carbon emission increases. The start of a nuclear power plant project involves several complex and interrelated activities with long duration. Experience shows that the time between the initial policy decision by a State to consider nuclear power up to the start of operation of its first nuclear power plant is about 10 to 15 years and that before specific project management can proceed, several key infrastructure issues have to be in place. The proper management of the wide scope of activities to be planned and implemented during this period represents a major challenge for the involved governmental, utility, regulatory, supplier and other supportive organizations. The main focus is to ensure that the project is implemented successfully from a commercial point of view while remaining in accordance with the appropriate engineering and quality requirements, safety standards and security guides. This publication is aimed at providing guidance on the practical management of a first nuclear power project in a country. There are many other issues, related to ensuring that the infrastructure in the country has been prepared adequately to ensure that the project will be able to be completed, that are only briefly addressed in this publication. The construction of the first nuclear power plant is a major undertaking for any country developing a nuclear power programme. Worldwide experience gained in the last 50 years

  2. Examining the Perceived Value of Integration of Earned Value Management with Risk Management-Based Performance Measurement Baseline

    Science.gov (United States)

    Shah, Akhtar H.

    2014-01-01

    Many projects fail despite the use of evidence-based project management practices such as Performance Measurement Baseline (PMB), Earned Value Management (EVM) and Risk Management (RM). Although previous researchers have found that integrated project management techniques could be more valuable than the same techniques used by themselves, these…

  3. 33 CFR 385.24 - Project Management Plans.

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Project Management Plans. 385.24... Processes § 385.24 Project Management Plans. (a) General requirements. (1) The Corps of Engineers and the... agencies, develop a Project Management Plan prior to initiating activities on a project. (2) The Project...

  4. NOMINATION FOR THE PROJECT MANAGEMENT INSTITUTE (PMI) PROJECT OF THE YEAR AWARD. INTEGRATED DISPOSAL FACILITY (IDF)

    International Nuclear Information System (INIS)

    MCLELLAN, G.W.

    2007-01-01

    permitting, scheduling, costs, stakeholders and technical issues. To meet the customer's needs and deadlines, the project was managed with conscientious discipline and application of sound project management principles in the Project Management Institute's Project Management Body of Knowledge. Several factors contributed to project success. Extensive planning and preparation were conducted, which was instrumental to contract and procurement management. Anticipating issues and risks, CH2M HILL prepared well defined scope and expectations, particularly for safety. To ensure worker safety, the project management team incorporated CH2M HILL's Integrated Safety Management System (ISMS) into the project and included safety requirements in contracting documents and baseline planning. The construction contractor DelHur Industries, Inc. adopted CH2M HILL's safety program to meet the procurement requirement for a comparable ISMS safety program. This project management approach contributed to an excellent safety record for a project with heavy equipment in constant motion and 63,555 man-hours worked. The project manager worked closely with ORP and Ecology to keep them involved in project decisions and head off any stakeholder or regulatory concerns. As issues emerged, the project manager addressed them expeditiously to maintain a rigorous schedule. Subcontractors and project contributors were held to contract commitments for performance of the work scope and requirements for quality, budget and schedule. Another element of project success extended to early and continual involvement of all interested in the project scope. Due to the public sensitivity of constructing a landfill planned for radioactive waste as well as offsite waste, there were many stakeholders and it was important to secure their agreement on scope and time frames. The project had multiple participants involved in quality assurance surveillances, audits and inspections, including the construction contractor, CH2M HILL

  5. NOMINATION FOR THE PROJECT MANAGEMENT INSTITUTE (PMI) PROJECT OF THE YEAR AWARD INTEGRATED DISPOSAL FACILITY (IDF)

    Energy Technology Data Exchange (ETDEWEB)

    MCLELLAN, G.W.

    2007-02-07

    issues as well as challenges with permitting, scheduling, costs, stakeholders and technical issues. To meet the customer's needs and deadlines, the project was managed with conscientious discipline and application of sound project management principles in the Project Management Institute's Project Management Body of Knowledge. Several factors contributed to project success. Extensive planning and preparation were conducted, which was instrumental to contract and procurement management. Anticipating issues and risks, CH2M HILL prepared well defined scope and expectations, particularly for safety. To ensure worker safety, the project management team incorporated CH2M HILL's Integrated Safety Management System (ISMS) into the project and included safety requirements in contracting documents and baseline planning. The construction contractor DelHur Industries, Inc. adopted CH2M HILL's safety program to meet the procurement requirement for a comparable ISMS safety program. This project management approach contributed to an excellent safety record for a project with heavy equipment in constant motion and 63,555 man-hours worked. The project manager worked closely with ORP and Ecology to keep them involved in project decisions and head off any stakeholder or regulatory concerns. As issues emerged, the project manager addressed them expeditiously to maintain a rigorous schedule. Subcontractors and project contributors were held to contract commitments for performance of the work scope and requirements for quality, budget and schedule. Another element of project success extended to early and continual involvement of all interested in the project scope. Due to the public sensitivity of constructing a landfill planned for radioactive waste as well as offsite waste, there were many stakeholders and it was important to secure their agreement on scope and time frames. The project had multiple participants involved in quality assurance surveillances, audits and

  6. Environmental Management Performance Report March 2000

    International Nuclear Information System (INIS)

    EDER, D.M.

    2000-01-01

    The purpose of this report is to provide the Department of Energy Richland Operations Office (DOE-RL) a report of the Project Hanford Management Contractors' (PHMC) Environmental Management (EM) performance by Fluor Hanford (FH) and its subcontractors. This report is a monthly publication that summarizes the PHMC EM performance. In addition, it includes some PHMC-level data not detailed elsewhere in the report. Section A, Executive Summary, provides an executive level summary of the cost, schedule, and technical performance described in this report. It summarizes performance for the period covered, highlights areas worthy of management attention, and provides a forward look to some of the upcoming key performance activities as extracted from the PHMC baseline. The remaining sections provide detailed performance data relative to each individual mission area (e.g., Waste Management, Spent Nuclear fuels , etc.), in support of Section A of the report. A glossary of terms is provided at the end of this report for reference purposes. Unless otherwise noted, the Safety, Conduct of Operations, and Cost/schedule data contained herein is as of January 31, 2000. All other information is as of March 1, 2000

  7. Environmental Management Performance Report March 2000

    Energy Technology Data Exchange (ETDEWEB)

    EDER, D.M.

    2000-03-16

    The purpose of this report is to provide the Department of Energy Richland Operations Office (DOE-RL) a report of the Project Hanford Management Contractors' (PHMC) Environmental Management (EM) performance by Fluor Hanford (FH) and its subcontractors. This report is a monthly publication that summarizes the PHMC EM performance. In addition, it includes some PHMC-level data not detailed elsewhere in the report. Section A, Executive Summary, provides an executive level summary of the cost, schedule, and technical performance described in this report. It summarizes performance for the period covered, highlights areas worthy of management attention, and provides a forward look to some of the upcoming key performance activities as extracted from the PHMC baseline. The remaining sections provide detailed performance data relative to each individual mission area (e.g., Waste Management, Spent Nuclear fuels , etc.), in support of Section A of the report. A glossary of terms is provided at the end of this report for reference purposes. Unless otherwise noted, the Safety, Conduct of Operations, and Cost/schedule data contained herein is as of January 31, 2000. All other information is as of March 1, 2000.

  8. Integrating Organizational Learning and Business Praxis: A Case for Intelligent Project Management.

    Science.gov (United States)

    Cavaleri, Steven A.; Fearon, David S.

    2000-01-01

    Project management provides a natural home for organizational learning, freeing it from mechanical processes. Organizational learning plays a critical role in intelligent project management, which combines manageability, performance outcomes of knowledge management, and innovation. Learning should be integrated into an organization's core…

  9. Risk assessment and management in IOR projects

    International Nuclear Information System (INIS)

    Goodyear, S.G.; Gregory, A.T.

    1994-01-01

    The application of IOR techniques is one of the investment opportunities open to Exploration and Production companies. A project will only go forward if the perceived balance between the rewards and the risks is acceptable. IOR projects may be ruled out because they are considered to involve significantly higher risks than conventional developments. Therefore, some means of evaluating the actual level of risk may be required if the full economic benefits from IOR techniques are to be realized. Risk assessment is a key element in safety cases, where a well-established methodology for quantifying risk exists. This paper discusses the extension of these methods to IOR project risk assessment. Combining reservoir and IOR technique uncertainties with their impact on project performance allows project risk to be better quantified. The results of the risk assessment are presented in terms of a risk-reward diagram that plots the probability surface for possible project outcomes as a function of NPV (reward) and exposure (risk)

  10. Human Resource Management and Performance

    NARCIS (Netherlands)

    J.P.P.E.F. Boselie (Paul); J. Paauwe (Jaap); P. Jansen (Paul)

    2000-01-01

    textabstractThe relationship between Human Resource Management (HRM) and performance of the firm has been a hot debated topic in the field of HRM/IR for the last decade. Most scientific research on this topic originates from the USA. In our paper we will give an overview of recent USA-based research

  11. A Framework for Effective Software Monitoring in Project Management

    African Journals Online (AJOL)

    A Framework for Effective Software Monitoring in Project Management. ... is shown to provide meaningful interpretation of collected metric data by embedding certain quality function. Key words: Project Management, Feedback, project control, metrics, process model, quantitative validity ... AJOL African Journals Online.

  12. Open Source and Proprietary Project Management Tools for SMEs.

    Directory of Open Access Journals (Sweden)

    Veronika Abramova

    2017-05-01

    Full Text Available The dimensional growth and increasing difficulty in project management promoted the development of different tools that serve to facilitate project management and track project schedule, resources and overall progress. These tools offer a variety of features, from task and time management, up to integrated CRM (Customer Relationship Management and ERP (Enterprise Resource Planning modules. Currently, a large number of project management software is available, to assist project team during the entire project lifecycle. We present the main differences between open source and proprietary project management tools and how those could be important for SMEs, describing the key features and how those can assist the project manager and the development team. In this paper, we analyse four open-source project management tools: OpenProject, ProjectLibre, Redmine, LibrePlan and four proprietary tools: Bitrix24, JIRA, Microsoft Project and Asana.

  13. Risk management in public sector construction projects: Case ...

    African Journals Online (AJOL)

    a project environment. Since projects are complicated, experience ... work, delays trigger cost overruns in construction projects (African. Development Bank ..... quantity surveying, contract management, and engineering. Table 4: Research ..... professionals at the business and operational levels of construction management.

  14. The role of project manager in benefits realization management as a project constraint/driver

    Directory of Open Access Journals (Sweden)

    Amr Mossalam

    2016-12-01

    In summary, the results of this paper can be used to: enlarging the project manager responsibilities to acquire the benefits realization, giving a high level 6-step process for benefits management, suggesting a mechanism for managing these benefits through benefits register, benefits realization plan, measures and KPIs and closure business case.

  15. Project management characteristics and new product survival

    NARCIS (Netherlands)

    Thieme, R.J.; Song, X.M.; Shin, C.S.

    2003-01-01

    We develop a conceptual model of new product development (NPD) based on seminal and review articles in order to answer the question, "What project management characteristics will foster the development of new products that are more likely to survive in the marketplace?" Our model adopts Ruekert and

  16. 50 top IT project management challenges

    CERN Document Server

    Doraiswamy, Premanand

    2012-01-01

    This book offers a focused and concise summary of 50 challenges facing today's IT project manager. The authors draw on years of practical experience (rather than classroom theory) to outline these challenges and offer useful tips and advice on how to deal with them.

  17. Project Management Approaches for Online Learning Design

    Science.gov (United States)

    Eby, Gulsun; Yuzer, T. Volkan

    2013-01-01

    Developments in online learning and its design are areas that continue to grow in order to enhance students' learning environments and experiences. However, in the implementation of new technologies, the importance of properly and fairly overseeing these courses is often undervalued. "Project Management Approaches for Online Learning Design"…

  18. Towards a Taxonomy for Project Management Competences

    NARCIS (Netherlands)

    Nijhuis, S.A.; Vrijhoef, R.; Kessels, Joseph

    2015-01-01

    Recent research on project management competences did not use a standard set of competences. Twenty-five publications, published in or after 2000, show little agreement on their competences: of the 353 only twelve percent is named more than once. Of the 353, 31 are linked to communication, but a

  19. Comparison of community managed projects and conventional ...

    African Journals Online (AJOL)

    Ejiro O. Taghwo

    This study aimed to compare Community Managed Projects (CMP) approach with the ... Author(s) agree that this article remain permanently open access under the terms of the Creative Commons Attribution ... attention to repair and upgrade failed systems in ... In addition to low success in improving coverage, non-.

  20. E-learning for Project Management

    DEFF Research Database (Denmark)

    Kampf, Constance Elizabeth

    2011-01-01

    This is a series of online videos designed for the Project management course, in my YouTube channel. The video links are currently private for my university course. Please email me at cka@asb.dk if you are interested in viewing them. The videos total about 12 hours of lectures, and are adapted...