  1. Project Planning and Implementation: Lessons Learned From the AQBMP Project

    National Research Council Canada - National Science Library

    1997-01-01

    ...). This NSRP report is funded as an addendum to the Air Quality Best Management Practices (AQBMP) project (N1 -944). The AQBMP project was completed using an intensive project planning process using a variety of quality management tools...

  2. Developing tools for the safety specification in risk management plans: lessons learned from a pilot project.

    Science.gov (United States)

    Cooper, Andrew J P; Lettis, Sally; Chapman, Charlotte L; Evans, Stephen J W; Waller, Patrick C; Shakir, Saad; Payvandi, Nassrin; Murray, Alison B

    2008-05-01

    Following the adoption of the ICH E2E guideline, risk management plans (RMP) defining the cumulative safety experience and identifying limitations in safety information are now required for marketing authorisation applications (MAA). A collaborative research project was conducted to gain experience with tools for presenting and evaluating data in the safety specification. This paper presents those tools found to be useful and the lessons learned from their use. Archive data from a successful MAA were utilised. Methods were assessed for demonstrating the extent of clinical safety experience, evaluating the sensitivity of the clinical trial data to detect treatment differences and identifying safety signals from adverse event and laboratory data to define the extent of safety knowledge with the drug. The extent of clinical safety experience was demonstrated by plots of patient exposure over time. Adverse event data were presented using dot plots, which display the percentages of patients with the events of interest, the odds ratio, and 95% confidence interval. Power and confidence interval plots were utilised for evaluating the sensitivity of the clinical database to detect treatment differences. Box and whisker plots were used to display laboratory data. This project enabled us to identify new evidence-based methods for presenting and evaluating clinical safety data. These methods represent an advance in the way safety data from clinical trials can be analysed and presented. This project emphasises the importance of early and comprehensive planning of the safety package, including evaluation of the use of epidemiology data.

  3. "Frankenstein." [Lesson Plan].

    Science.gov (United States)

    Simon, Melanie

    Based on Mary Shelley's novel "Frankenstein," this lesson plan presents activities designed to help students understand that active readers interpret a novel (its characters, plot, setting, and theme) in different ways; and the great literature can be and has been adapted in many ways over time. The main activity of the lesson involves students…

  4. Lesson Planning the Kodaly Way.

    Science.gov (United States)

    Boshkoff, Ruth

    1991-01-01

    Discusses the contribution of Zoltan Kodaly to music lesson planning. Emphasizes preparation, presentation, and practice as the three important strategies in teaching concepts and skills to be included in a lesson plan. Includes a sample lesson plan covering a semester and advice on choosing song material. (DK)

  5. Brothers Grimm. [Lesson Plan].

    Science.gov (United States)

    Discovery Communications, Inc., Bethesda, MD.

    Based on Grimm's fairy tales, this lesson plan presents activities designed to help students understand that fairy tales connect them to earlier generations, help them think about present situations, that magic figures prominently in fairy tales, and that fairy tales can inspire readers to create original works of art. The main activity in the…

  6. Recycling Lesson Plan

    Science.gov (United States)

    Okaz, Abeer Ali

    2013-01-01

    This lesson plan designed for grade 2 students has the goal of teaching students about the environmental practice of recycling. Children will learn language words related to recycling such as: "we can recycle"/"we can't recycle" and how to avoid littering with such words as: "recycle paper" and/or "don't throw…

  7. Smart Consumer Lesson Plans.

    Science.gov (United States)

    New Jersey Consortium for Consumer Education, Newark.

    Lesson plans are provided for use with different populations of pre-K through senior high school students in four different areas of consumer education. Eight units in advertising are included: A First Look at Ads (pre-K-Grade 3), Don't Judge a Book by Its Cover (Grades 1-3), Fatal Distraction (Junior High), Package Labeling (Junior High), Product…

  8. Virtual reality in decommissioning projects: experiences, lessons learned and future plans

    International Nuclear Information System (INIS)

    Rindahl, G.; Mark, N.K.F.; Meyer, G.

    2006-01-01

    The work on Virtual Reality (VR) tools for decommissioning planning, dose estimation and work management started at the Norwegian Institute for Energy Technology (IFE) in 1999 in the VR dose project with Japan Nuclear Cycle development institute (JNC), now JAEA. The main aim of this effort has been to help minimize workers' radiation exposure, as well as help to achieve more efficient use of human resources. VR dose is now used in the decommissioning of one of JNC's reactors, the Fugen Nuclear Power Station. This VR decommissioning project has later resulted in a series of projects and applications. In addition to decommissioning, IFE also put great focus on two other branches of VR tools, namely tools for knowledge management, training and education in operating facilities and tools for control room design. During the last years, this work, beginning at different ends, has been converging more and more towards VR technology for use through out the life cycle of a facility. A VR training simulator for a refuelling machine of the Leningrad NPP (LNPP) developed in cooperation with the Russian Research Centre Kurchatov Institute (RRC KI) is now planned to be used in connection with the decommissioning of the three intact reactors at Chernobyl in Ukraine. In this paper we describe experiences from use of VR in decommissioning processes, as well as results from bringing the VR technology initially developed for planned or productive facilities into the decommissioning toolbox. (author)

  9. Bead Game Simulation. Lesson Plan.

    Science.gov (United States)

    Ripp, Ken

    This lesson plan offers students the opportunity to participate in the three basic economic systems (market, command, and tradition). By working in each of the systems, students will internalize the fundamental values present in each system and will gain insights into the basic advantages and disadvantages of each system. The lesson plan provides…

  10. Sample Lesson Plans. Management for Effective Teaching.

    Science.gov (United States)

    Fairfax County Public Schools, VA. Dept. of Instructional Services.

    This guide is part of the Management for Effective Teaching (MET) support kit, a pilot project developed by the Fairfax County (Virginia) Public Schools to assist elementary school teachers in planning, managaing, and implementing the county's curriculum, Program of Studies (POS). In this guide, a sample lesson plan of a teaching-learning activity…

  11. Brentwood Lessons Learned Project Report

    Energy Technology Data Exchange (ETDEWEB)

    Rivkin, Carl H. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Caton, Melanie C. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Ainscough, Christopher D. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Marcinkoski, Jason [Dept. of Energy (DOE), Washington DC (United States)

    2017-09-26

    The purpose of this report is to document lessons learned in the installation of the hydrogen fueling station at the National Park Service Brentwood site in Washington, D.C., to help further the deployment of hydrogen infrastructure required to support hydrogen and other fuel cell technologies. Hydrogen fueling is the most difficult infrastructure component to build and permit. Hydrogen fueling can include augmenting hydrogen fueling capability to existing conventional fuel fueling stations as well as building brand new hydrogen fueling stations. This report was produced as part of the Brentwood Lessons Learned project. The project consisted of transplanting an existing modular hydrogen fueling station from Connecticut to the National Park Service Brentwood site. This relocation required design and construction at the Brentwood site to accommodate the existing station design as well as installation and validation of the updated station. One of the most important lessons learned was that simply moving an existing modular station to an operating site was not necessarily straight-forward - performing the relocation required significant effort and cost. The station has to function at the selected operating site and this functionality requires a power supply, building supports connecting to an existing alarm system, electrical grounding and lighting, providing nitrogen for purging, and providing deionized water if an electrolyzer is part of the station package. Most importantly, the station has to fit into the existing site both spatially and operationally and not disrupt existing operations at the site. All of this coordination and integration requires logistical planning and project management. The idea that a hydrogen fueling station can be simply dropped onto a site and made immediately operational is generally not realistic. Other important lessons learned include that delineating the boundaries of the multiple jurisdictions that have authority over a project for

  12. Keiko, Killer Whale. [Lesson Plan].

    Science.gov (United States)

    Discovery Communications, Inc., Bethesda, MD.

    This lesson plan presents activities designed to help students understand that Keiko, the killer whale, lived for a long time in an aquarium and had to be taught to live independently; and that computer users can get updates on how Keiko is doing. The main activity of the lesson involves middle school students working in small groups to produce a…

  13. Classroom Management and Lesson Planning(4)

    Institute of Scientific and Technical Information of China (English)

    2006-01-01

    Lesson PlanningTask 1As teachers,we all need to plan our lessons before we teach.Make a list of things that you think need tobe included in a lesson plan.Then compare and discuss your list with another teacher.Also think about reasonswhy we need to plan our lessons.

  14. Classroom Management and Lesson Planning(4)

    Institute of Scientific and Technical Information of China (English)

    2006-01-01

    @@ Lesson Planning Task 1 As teachers,we all need to plan our lessons before we teach.Make a list of things that you think need to be included in a lesson plan.Then compare and discuss your list with another teacher.Also think about reasons why we need to plan our lessons.

  15. Supporting teachers' technology integration in lesson plans

    NARCIS (Netherlands)

    Janssen, Noortje

    2017-01-01

    Lesson planning offers rich opportunities for teachers to consider and implement technology in the classroom. This dissertation investigated the design and effectiveness of supplementary information to assist pre-service teachers during the lesson planning process. Based on the Technological,

  16. For Sale: Your Lesson Plans

    Science.gov (United States)

    Greene, Kim

    2016-01-01

    The last several years has seen an increasingly popular trend of teachers buying and selling their lesson plans and other self-created classroom materials in online marketplaces. The leader in this space is a website called Teachers Pay Teachers, which boasts 3.8 million active users. In this article, the author examines why these sites became…

  17. Children of War. [Lesson Plan].

    Science.gov (United States)

    Discovery Communications, Inc., Bethesda, MD.

    This lesson plan presents activities in which students read, analyze, and discuss excerpts from children's war diaries; and create a storyboard for a public service announcement on children's rights in wartime. It includes objectives, materials, procedures, extension activities, excerpts of children's war diaries, suggested readings, and web…

  18. "Pride and Prejudice". [Lesson Plan].

    Science.gov (United States)

    Soderquist, Alisa

    Based on Jane Austen's novel "Pride and Prejudice," this lesson plan presents activities designed to help students understand that classics are those pieces of literature that continue to be popular long after they were written; classics tend to have universal themes; and Austen's writing has been updated and dramatized and, most likely, will…

  19. Machiavelli's "The Prince." [Lesson Plan].

    Science.gov (United States)

    Discovery Communications, Inc., Bethesda, MD.

    Based on Machiavelli's book "The Prince," this lesson plan presents activities designed to help students understand that Machiavelli's enumeration of leadership qualities for a prince has always been controversial; and that leaders and followers may differ in what they identify as the qualities of a good leader. The main activity of the lesson…

  20. The 'Amistad' Case. Lesson Plan.

    Science.gov (United States)

    National Archives and Records Administration, Washington, DC.

    Teaching about the Amistad case provides correlations to the National Standards for History, and Civics and Government. An overview of the events of 1839 is given in this lesson plan. Seven student activities include reading and using primary source documents, writing journal articles, viewing the movie "Amistad," and giving…

  1. The Great Gatsby. [Lesson Plan].

    Science.gov (United States)

    Zelasko, Ken

    Based on F. Scott Fitzgerald's novel "The Great Gatsby," this lesson plan presents activities designed to help students understand that adapting part of a novel into a dramatic reading makes students more intimate with the author's intentions and craft; and that a part of a novel may lend itself to various oral interpretations. The main activity…

  2. Five Geobrowsing Lesson Plans

    Science.gov (United States)

    de Paor, D. G.; Daniels, J.; Tyagi, I.

    2007-12-01

    Virtual globes such as Google Earth or NASA World Wind may be used as is, without KML coding or inclusion of three-dimensional models, to design effective learning experiences. With KML coding and Collada modeling, sophisticated learning objects may be developed. Five examples are presented for interactive demonstration, covering a range of student levels of ability: (i) "Wait, Don't Tell Me!" Students predict locations on the globe given Lat / Lon or UTM data and then confirm their judgments using "Fly to" (ii) "Where on Earth?" Students search for features on the virtual globe given images, data, and/or models. (iii) "Tsunami!" Students react to modeled real-time data feeds and decide whether to issue an natural hazard alert. (iv) "To the Rescue!" Students estimate food, water, and housing needs resulting from a natural disater and plan rescue and relief operations. (v) "Just Map It!" Students overlay their own field data on the virtual terrain and create solid models of geological structures.

  3. Lessons Learned for Decommissioning Planning

    International Nuclear Information System (INIS)

    Sohn, Wook; Kim, Young-gook; Kim, Hee-keun

    2015-01-01

    The purpose of this paper is to introduce the U.S. nuclear industrial's some key lessons learned especially for decommissioning planning based on which well informed decommissioning planning can be carried out. For a successful decommissioning, it is crucial to carry out a well-organized decommissioning planning before the decommissioning starts. This paper discussed four key factors which should be decided or considered carefully during the decommissioning planning period with introduction of related decommissioning lessons learned of U.S. nuclear industry. Those factors which have been discussed in this paper include the end state of a site, the overall decommissioning strategy, the management of the spent fuels, and the spent fuel pool island. Among them, the end state of a site should be decided first as it directs the whole decommissioning processes. Then, decisions on the overall decommissioning strategy (DECON vs. SAFSTOR) and the management of the spent fuels (wet vs. dry) should follow. Finally, the spent fuel pool island should be given due consideration because its implementation will result in much cost saving. Hopefully, the results of this paper would provide useful inputs to performing the decommissioning planing for the Kori unit 1

  4. Lesson Planning with the Common Core

    Science.gov (United States)

    Estes, Linda A.; McDuffie, Amy Roth; Tate, Cathie

    2014-01-01

    Planning a lesson can be similar to planning a road trip--a metaphor the authors use to describe how they applied research and theory to their lesson planning process. A map and mode of transportation, the Common Core State Standards for Mathematics (CCSSM) and textbooks as resources, can lead to desired destinations, such as students engaging in…

  5. Project Choice: Lessons Learned.

    Science.gov (United States)

    Ewing Marion Kauffman Foundation, Kansas City, MO.

    Project Choice began with a simple goal: to increase the number of inner-city students who graduate from high school on time and become productive members of society. To that end, Ewing M. Kauffman, his Foundation, and associates designed and implemented a program that promised postsecondary education or training to some students in the Kansas…

  6. Planning geometry lessons with learning platforms

    DEFF Research Database (Denmark)

    Tamborg, Andreas Lindenskov

    mathematics teachers’ joint planning of a lesson in geometry with a learning platform called Meebook is analyzed using the instrumental approach. It is concluded that the interface in Meebook orients the teachers work toward what the students should do rather than what they should learn, although the latter......This paper investigates how mathematics teachers plan lessons with a recently implemented Danish learning platform designed to support teachers in planning lessons in line with a recent objective-oriented curriculum. Drawing on data from observations of and interviews with teachers, three...... is a key intention behind the implementation of the platform. It is also concluded that when the teachers succeed in using learning objectives actively in their planning, the objectives support the teachers in designing lessons that correspond with their intentions. The paper concludes with a discussion...

  7. A summary of lessons learned at the Shippingport Station Decommissioning Project (SSDP)

    International Nuclear Information System (INIS)

    Crimi, F.P.; Mullee, G.R.

    1987-10-01

    This paper describes the lessons learned from a management perspective during decommissioning. The lessons learned are presented in a chronological sequence during the life of the project up to the present time. The careful analysis of the lessons learned and the implementation of corresponding actions have contributed toward improving the effectiveness of decommissioning as time progresses. The lessons learned should be helpful in planning future decommissioning projects

  8. XML technology planning database : lessons learned

    Science.gov (United States)

    Some, Raphael R.; Neff, Jon M.

    2005-01-01

    A hierarchical Extensible Markup Language(XML) database called XCALIBR (XML Analysis LIBRary) has been developed by Millennium Program to assist in technology investment (ROI) analysis and technology Language Capability the New return on portfolio optimization. The database contains mission requirements and technology capabilities, which are related by use of an XML dictionary. The XML dictionary codifies a standardized taxonomy for space missions, systems, subsystems and technologies. In addition to being used for ROI analysis, the database is being examined for use in project planning, tracking and documentation. During the past year, the database has moved from development into alpha testing. This paper describes the lessons learned during construction and testing of the prototype database and the motivation for moving from an XML taxonomy to a standard XML-based ontology.

  9. Treating Social Anxiety in Adolescents: Ten Group Therapy Lesson Plans

    Science.gov (United States)

    Mazur-Elmer, Alison; McBride, Dawn

    2009-01-01

    This project provides a comprehensive overview of the research literature on social anxiety disorder (SAD) in adolescents and concludes by offering a set of 10 group therapy lesson plans for SAD that therapists can use in their practice. The overview includes a description of social anxiety disorder and highlights various theories of anxiety. The…

  10. With Interest It Comes To...Unconscionable Clauses in Sales Contracts. A Student's Lesson Plan [and] A Teacher's Lesson Plan [and] A Lawyer's Lesson Plan.

    Science.gov (United States)

    Howard, Estelle; And Others

    One of a series of secondary level teaching units presenting case studies with pro and con analysis of particular legal problems, the document presents a student's lesson plan, a teacher's lesson plan, and a lawyer's lesson plan on unconscionable clauses in sales contracts. The unit acquaints students with the operation of sales contracts and…

  11. Software Engineering Team Project - lessons learned

    Directory of Open Access Journals (Sweden)

    Bogumiła Hnatkowska

    2013-06-01

    Full Text Available In the 2010/11 academic year the Institute of Informatics at Wroclaw University of Technology issued ’Software Engineering Team Project’ as a course being a part of the final exam to earn bachelor’s degree. The main assumption about the course was that it should simulate the real environment (a virtual IT company for its participants. The course was aimed to introduce issues regarding programming in the medium scale, project planning and management. It was a real challenge as the course was offered for more than 140 students. The number of staff members involved in its preparation and performance was more than 15. The paper presents the lessons learned from the first course edition as well as more detailed qualitative and quantitative course assessment.

  12. Minecraft in support of teaching sustainable spatial planning in secondary education lessons learned from the Marker Wadden-project

    NARCIS (Netherlands)

    Opmeer, M.; Dias, E.; De Vogel, B.; Tangerman, L.; Scholten, H. J.

    2018-01-01

    In this article, we have assessed the educational affordances of Minecraft to teach school children about sustainable spatial planning. Specifically, we carefully examined the expectations and experiences of the learners and the teachers of this digital game as an educational tool for spatial

  13. Lessons learnt from Ignalina NPP decommissioning project

    International Nuclear Information System (INIS)

    NAISSE, Jean-Claude

    2007-01-01

    The Ignalina Nuclear Power Plant (INPP) is located in Lithuania, 130 km north of Vilnius, and consists of two 1500 MWe RBMK type units, commissioned respectively in December 1983 and August 1987. On the 1. of May 2004, the Republic of Lithuania became a member of the European Union. With the protocol on the Ignalina Nuclear Power in Lithuania which is annexed to the Accession Treaty, the Contracting Parties have agreed: - On Lithuanian side, to commit closure of unit 1 of INPP before 2005 and of Unit 2 by 31 December 2009; - On European Union side, to provide adequate additional Community assistance to the efforts of Lithuania to decommission INPP. The paper is divided in two parts. The first part describes how, starting from this agreement, the project was launched and organized, what is its present status and which activities are planned to reach the final ambitious objective of a green field. To give a global picture, the content of the different projects that were defined and the licensing process will also be presented. In the second part, the paper will focus on the lessons learnt. It will explain the difficulties encountered to define the decommissioning strategy, considering both immediate or differed dismantling options and why the first option was finally selected. The paper will mention other challenges and problems that the different actors of the project faced and how they were managed and solved. The paper will be written by representatives of the Ignalina NPP and of the Project Management Unit. (author)

  14. Evaluating Eyewitness Reports [Lesson Plan].

    Science.gov (United States)

    2000

    This lesson offers students experience in making historical meaning from eyewitness accounts that present a range of different perspectives. Students begin with a case study in working with alternative reports of a single event: the Great Chicago Fire of 1871. First, they compare two newspaper reports on the fire, then two memoirs of the fire…

  15. Charismatic Leaders: A Lesson Plan.

    Science.gov (United States)

    Johns, Robert W.

    1983-01-01

    Focusing upon Franklin D. Roosevelt and Adolf Hitler, these lessons for high school students in U.S. or world history courses deal with what charismatic leadership is, what circumstances and personality factors generate charismatic movements, and the role, results, and dangers of charismatic leadership. (RM)

  16. Most Effective Practices in Lesson Planning

    Science.gov (United States)

    Womack, Sid T.; Pepper, Stephanie; Hanna, Shellie L.; Bell, Columbus David

    2015-01-01

    In a previous study with 130 undergraduate teacher candidates from all licensure levels, data on candidate effectiveness were examined using factor analysis. Four factors were found in effective teaching, those being lesson planning, teacher and student reflection, safe school environment, and teacher professionalism. The present study followed…

  17. Winter Secrets: An Instant Lesson Plan.

    Science.gov (United States)

    Collyer, Cam

    1997-01-01

    Outdoor lesson plan aims to stimulate student interest in animals' adaptations to winter and the various signs and clues to animal behavior. Includes questions for class discussion, tips for guiding the hike, and instructions for two games that illustrate the predator-prey relationship. Notes curriculum connections to the East York (Ontario) Board…

  18. Twain's "Hannibal." Learning Page Lesson Plan.

    Science.gov (United States)

    Wood, Jan; Thiese, Norma

    Writers are influenced by their environment including family, community, lifestyle, or location. One such writer was Mark Twain. With this lesson plan the learner will become familiar with and analyze life around Mark Twain's hometown, Hannibal, Missouri, during the latter half of the 19th century by using various online and print resources to…

  19. Planning Complex Projects Automatically

    Science.gov (United States)

    Henke, Andrea L.; Stottler, Richard H.; Maher, Timothy P.

    1995-01-01

    Automated Manifest Planner (AMP) computer program applies combination of artificial-intelligence techniques to assist both expert and novice planners, reducing planning time by orders of magnitude. Gives planners flexibility to modify plans and constraints easily, without need for programming expertise. Developed specifically for planning space shuttle missions 5 to 10 years ahead, with modifications, applicable in general to planning other complex projects requiring scheduling of activities depending on other activities and/or timely allocation of resources. Adaptable to variety of complex scheduling problems in manufacturing, transportation, business, architecture, and construction.

  20. Plant Identification Characteristics for Deciduous Trees & Shrubs. Lesson Plans.

    Science.gov (United States)

    Burkholder, Kathy

    This manual contains a group of lesson plans designed for use with a slide series (not included here). Its purpose is to introduce students to the basic concepts and terminology used in the identification of deciduous trees and shrubs. The manual is composed of 12 lesson plans. The first lesson is an introduction to plant identification. The…

  1. Spent Nuclear Fuel project, project management plan

    International Nuclear Information System (INIS)

    Fuquay, B.J.

    1995-01-01

    The Hanford Spent Nuclear Fuel Project has been established to safely store spent nuclear fuel at the Hanford Site. This Project Management Plan sets forth the management basis for the Spent Nuclear Fuel Project. The plan applies to all fabrication and construction projects, operation of the Spent Nuclear Fuel Project facilities, and necessary engineering and management functions within the scope of the project

  2. A framework for considering climate change in transportation and land use scenario planning : lessons learned from an interagency pilot project on Cape Cod.

    Science.gov (United States)

    2011-07-01

    The Interagency Transportation, Land Use, and Climate Change Pilot Project utilized a scenario planning process to develop a multi-agency transportation- and land use-focused development strategy for Cape Cod, Massachusetts, with the intention of ach...

  3. A Lesson Plan Incorporating Collaborative Strategic Reading

    Institute of Scientific and Technical Information of China (English)

    陈江萍

    2017-01-01

    This essay is going to have an in-depth analysis of the Collaborative Strategic Reading, a four-step reading comprehen-sion strategy popular in the Western classrooms. It will start with some brief introduction about this instructional approach in company with its theoretical rationale and research evidence for its effectiveness of improving learners 'reading competence. Fo-cused on the previewing skill, the first step of the reading instruction, a modified lesson plan is designed in the Chinese high school setting, followed by justification of the major elements of the plan, and some practical implications.

  4. A Lesson Plan Incorporating Collaborative Strategic Reading

    Institute of Scientific and Technical Information of China (English)

    陈江萍

    2017-01-01

    This essay is going to have an in-depth analysis of the Collaborative Strategic Reading, a four-step reading comprehen?sion strategy popular in the Western classrooms. It will start with some brief introduction about this instructional approach in company with its theoretical rationale and research evidence for its effectiveness of improving learners 'reading competence. Fo?cused on the previewing skill, the first step of the reading instruction, a modified lesson plan is designed in the Chinese high school setting, followed by justification of the major elements of the plan, and some practical implications.

  5. Risks management in project planning

    OpenAIRE

    Stankevičiūtė, Roberta

    2017-01-01

    Project management consists of two very important aspects – managing the right project and managing the project right. To know that you are managing the right project you need to ensure that your project is based on an actual requirement and that your project goal is relevant and beneficial. And professional project planning assists in managing project the right way. The project planning process is very time consuming and is one of the most important parts of the project management process. T...

  6. Summary of Planned Implementation for the HTGR Lessons Learned Applicable to the NGNP

    International Nuclear Information System (INIS)

    Mckirdy, Ian

    2011-01-01

    This document presents a reconciliation of the lessons learned during a 2010 comprehensive evaluation of pertinent lessons learned from past and present high temperature gas-cooled reactors that apply to the Next Generation Nuclear Plant Project along with current and planned activities. The data used are from the latest Idaho National Laboratory research and development plans, the conceptual design report from General Atomics, and the pebble bed reactor technology readiness study from AREVA. Only those lessons related to the structures, systems, and components of the Next Generation Nuclear Plant (NGNP), as documented in the recently updated lessons learned report are addressed. These reconciliations are ordered according to plant area, followed by the affected system, subsystem, or component; lesson learned; and finally an NGNP implementation statement. This report (1) provides cross references to the original lessons learned document, (2) describes the lesson learned, (3) provides the current NGNP implementation status with design data needs associated with the lesson learned, (4) identifies the research and development being performed related to the lesson learned, and (5) summarizes with a status of how the lesson learned has been addressed by the NGNP Project.

  7. Good Practice Lessons from the Urban Traffic Project, Denmark

    DEFF Research Database (Denmark)

    Flyvbjerg, Bent

    2002-01-01

    In 1990, as the first government in the world, the Danish Cabinet approved a national action plan for sustainable transport. In 1992, as part of the implementation of this plan, the Urban Traffic Project was set up with the EPA. The policy situation was one of a state agency trying to motivate...... urban municipalities to work with T&E (transport and environment) integration, i.e. integration of concerns for safety, energy, air quality, noise etc. in urban traffic planning. 50 major urban municipalities participated in the project. The most important lessons to be learned from the project are: (1......) With a fairly modest investment (DKK 150 million in seed money) it has been possible on a voluntary basis to motivate the majority of urban municipalities to work with T&E integration. (2) The top motivating factor for municipalities to participate was a desire for organisational and professional learning. (3...

  8. Incorporating the Six Core Elements of Health Care Transition Into a Medicaid Managed Care Plan: Lessons Learned From a Pilot Project.

    Science.gov (United States)

    McManus, Margaret; White, Patience; Pirtle, Robin; Hancock, Catina; Ablan, Michael; Corona-Parra, Raquel

    2015-01-01

    This pediatric-to-adult health care transition pilot project describes the process and results of incorporating the "Six Core Elements of Health Care Transition (2.0)" into a Medicaid managed care plan with a group of 35 18-23 year olds who have chronic mental health, developmental, and complex medical conditions. The pilot project demonstrated an effective approach for customizing and delivering recommended transition services. At the start of the 18-month project, the Medicaid plan was at the basic level (1) of transition implementation of the Six Core Elements with no transition policy, member transition readiness assessment results, health care transition plans of care, updated medical summaries, transfer package for the adult-focused provider, and assurance of transfer completion and consumer feedback. At the conclusion of the pilot project, the plan scored at level 3 on each core element. The primary reason for not scoring at the highest level (4) was because the transition elements have not been incorporated into services for all enrollees within the plan. Future efforts in managed care will benefit from starting the transition process much earlier (ages 12-14), expanding the role of nurse care managers and participating pediatric and adult-focused clinicians in transition, and offering payment incentives to clinicians to implement the Six Core Elements of Health Care Transition. Copyright © 2015 Elsevier Inc. All rights reserved.

  9. ERP Project Management Lessons Learned

    Science.gov (United States)

    Carroll, Timothy D.

    2009-01-01

    Implementing an enterprise resource planning (ERP) system is a major undertaking for any higher education institution, with many challenges along the way. More than three years ago, Roane State Community College began a journey to implement an ERP system. Roane State recently completed a very successful implementation of the SunGard Banner Student…

  10. Radiological Control Technician: Phase 1, Site academic training lesson plans

    International Nuclear Information System (INIS)

    1992-10-01

    This volume provides lesson plans for training radiological control technicians. Covered here is basic radiological documentation, counting errors, dosimetry, environmental monitoring, and radiation instruments

  11. Planned Positron Factory project

    International Nuclear Information System (INIS)

    Okada, Sohei

    1990-01-01

    The Japan Atomic Energy Research Institute, JAERI, has started, drafting a construction plan for the 'Positron Factory', in which intense energy-controllable monoenergetic positron beams are produced from pair-production reactions caused by high-energy electrons from a linac. The JAERI organized a planning committee to provide a basic picture for the Positron Factory. This article presents an overview of the interactions of positrons, intense positron sources and the research program and facilities planned for the project. The interactions of positrons and intense positron sources are discussed focusing on major characteristics of positrons in different energy ranges. The research program for the Positron Factory is then outlined, focusing on advanced positron annihilation techniques, positron spectroscopy (diffraction, scattering, channeling, microscopy), basic positron physics (exotic particle science), and positron beam technology. Discussion is also made of facilities required for the Positron Factory. (N.K.)

  12. Recertification Project Plan

    International Nuclear Information System (INIS)

    2001-01-01

    The Waste Isolation Pilot Plant's (WIPP) Recertification Project was established to meet the requirement placed in the WIPP Land Withdrawal Act (LWA) to demonstrate WIPP's continued compliance with the Environmental Protection Agency's (EPA) disposal regulations at five-year intervals. This plan delineates the end goal of the effort, sets out interim goals, and offers up guiding assumptions. In general, it sets the overall direction for a highly complex and interdependent set of tasks leading to recertification of the repository in the spring of 2004. In addition, this plan establishes the institutional roles and responsibilities of WIPP project participants in the recertification effort and lays out a high-level schedule for producing the Compliance Recertification Application (CRA). Detailed plans from each organization supporting this project have been included with this document as attachments. Each participant plan provides significantly more detail with descriptions of activities that are designed to ensure a successful outcome. Woven throughout this plan are the elements of guidance and direction gained from technical exchanges with EPA managers and staff. An important principle on which this plan is built is that the process of recertification will not involve modification to the certification baseline, nor will it involve rule making of any kind. Only changes previously approved by the EPA will be detailed in the CRA. EPA-approved changes to the WIPP certification will be accepted through modification or will be approved through the annual change reporting process. For any compliance areas that have not changed since the submission of the Compliance Certification Application(CCA), these will merely be incorporated in the CRA by reference. The CRA will cover all information since the October 1996 submittal of the CCA. A second major principle on which this plan is built stems from the EPA WIPP Recertification Guidance. That guidance makes it clear that, if

  13. Project Management Plan

    International Nuclear Information System (INIS)

    1988-01-01

    The mission of the Uranium Mill Tailings Remedial Action (UMTRA) Project is explicitly stated and directed in the Uranium Mill Tailings Radiation Control Act of 1978, Public Law 95-604, 42 USC 7901 (hereinafter referred to as the ''Act''). Title I of the Act authorizes the Department of Energy (DOE) to undertake remedial actions at 24 designated inactive uranium processing sites and associated vicinity properties containing uranium mill tailings and other residual radioactive materials derived from the processing sites. The Act, amended in January 1983, by Public Law 97-415, also authorizes DOE to perform remedial actions at vicinity properties in Edgemont, South Dakota. Cleanup of the Edgemont processing site is the responsibility of the Tennessee Valley Authority. This document describes the plan, organization, system, and methodologies used to manage the design, construction, and other activities required to clean up the designated sites and associated vicinity properties in accordance with the Act. The plan describes the objectives of the UMTRA Project, defines participants' roles and responsibilities, outlines the technical approach for accomplishing the objectives, and describes the planning and managerial controls to be used in integrating and performing the Project mission. 21 figs., 21 tabs

  14. The Fernald Closure Project: Lessons Learned

    International Nuclear Information System (INIS)

    Murphy, Cornelius M.; Carr, Dennis

    2008-01-01

    For nearly 37 years, the U.S. Department of Energy site at Fernald - near Cincinnati, Ohio - produced 230,000 metric tons (250,000 short tons) of high-purity, low-enriched uranium for the U.S. Defense Program, generating more than 5.4 million metric tons (6 million short tons) of liquid and solid waste as it carried out its Cold War mission. The facility was shut down in 1989 and clean up began in 1992, when Fluor won the contract to clean up the site. Cleaning up Fernald and returning it to the people of Ohio was a $4.4 billion mega environmental-remediation project that was completed in October 2006. Project evolved through four phases: - Conducting remedial-investigation studies to determine the extent of damage to the environment and groundwater at, and adjacent to, the production facilities; - Selecting cleanup criteria - final end states that had to be met that protect human health and the environment; - Selecting and implementing the remedial actions to meet the cleanup goals; - Executing the work in a safe, compliant and cost-effective manner. In the early stages of the project, there were strained relationships - in fact total distrust - between the local community and the DOE as a result of aquifer contamination and potential health effects to the workers and local residents. To engage citizens and interested stakeholders groups in the decision-making process, the DOE and Fluor developed a public-participation strategy to open the channels of communication with the various parties: site leadership, technical staff and regulators. This approach proved invaluable to the success of the project, which has become a model for future environmental remediation projects. This paper will summarize the history and shares lessons learned: the completion of the uranium-production mission to the implementation of the Records of Decision defining the cleanup standards and the remedies achieved. Lessons learned fall into ten categories: - Regulatory approach with end

  15. The Paper Airplane Challenge: A Market Economy Simulation. Lesson Plan.

    Science.gov (United States)

    Owens, Kimberly

    This lesson plan features a classroom simulation that helps students understand the characteristics of a market economic system. The lesson plan states a purpose; cites student objectives; suggests a time duration; lists materials needed; and details a step-by-step teaching procedure. The "Paper Airplane Challenge" handout is attached. (BT)

  16. IX Disposition Project - project management plan

    International Nuclear Information System (INIS)

    Choi, I.G.

    1994-01-01

    This report presents plans for resolving saving and disposal concerns for ion exchange modules, cartridge filters and columns. This plan also documents the project baselines for schedules, cost, and technical information

  17. Lessons learned from decommissioning projects at Los Alamos National Laboratory

    International Nuclear Information System (INIS)

    Salazar, M.

    1995-01-01

    This paper describes lessons learned over the last 20 years from 12 decommissioning projects at Los Alamos National Laboratory. These lessons relate both to overall program management and to management of specific projects during the planning and operations phases. The issues include waste management; the National Environmental Policy Act (NEPA); the Resource Conservation and Recovery Act (RCRA); the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA); contracting; public involvement; client/customer interface; and funding. Key elements of our approach are to be proactive; follow the observation method; perform field activities concurrently; develop strategies to keep reportable incidents from delaying work; seek and use programs, methods, etc., in existence to shorten learning curves; network to help develop solutions; and avoid overstudying and overcharacterizing. This approach results in preliminary plans that require very little revision before implementation, reasonable costs and schedules, early acquisition of permits and NEPA documents, preliminary characterization reports, and contracting documents. Our track record is good -- the last four projects (uranium and plutonium-processing facility and three research reactors) have been on budget and on schedule

  18. Project Management Plan Solution Stabilization

    Energy Technology Data Exchange (ETDEWEB)

    SATO, P.K.

    1999-08-31

    This plan presents the overall objectives, description, justification and planning for the Plutonium Finishing Plant (PFP) Solutions Stabilization subproject. The intent of this plan is to describe how this project will be managed and integrated with other facility stabilization and deactivation activities. This plan supplements the overall integrated plan presented in the Integrated Project Management Plan (IPMP) for the Plutonium Finishing Plant Stabilization and Deactivation Project, HNF-3617. This project plan is the top-level definitive project management document for the PFP Solution Stabilization subproject. It specifies the technical, schedule, requirements and the cost baselines to manage the execution of the Solution Stabilization subproject. Any deviations to the document must be authorized through the appropriate change control process.

  19. Project Management Plan Solution Stabilization

    International Nuclear Information System (INIS)

    SATO, P.K.

    1999-01-01

    This plan presents the overall objectives, description, justification and planning for the Plutonium Finishing Plant (PFP) Solutions Stabilization subproject. The intent of this plan is to describe how this project will be managed and integrated with other facility stabilization and deactivation activities. This plan supplements the overall integrated plan presented in the Integrated Project Management Plan (IPMP) for the Plutonium Finishing Plant Stabilization and Deactivation Project, HNF-3617. This project plan is the top-level definitive project management document for the PFP Solution Stabilization subproject. It specifies the technical, schedule, requirements and the cost baselines to manage the execution of the Solution Stabilization subproject. Any deviations to the document must be authorized through the appropriate change control process

  20. Development of short Indonesian lesson plan to improve teacher performance

    Science.gov (United States)

    Yulianto, B.; Kamidjan; Ahmadi, A.; Asteria, P. V.

    2018-01-01

    The developmental research was motivated by the results of preliminary study through interviews, which revealed almost all of the teachers did not create lesson plan themselves. As a result of this load, the performance of the real learning in the classroom becomes inadequate. Moreover, when lesson plan was not made by teachers themselves, the learning process becomes ineffective. Therefore, this study designed to develop a prototype of the short lesson plan, in particular, Indonesian language teaching, and to investigate its effectiveness. The participants in the study were teachers who were trained through lesson study group to design short model’s lesson plan. Questionnaires and open-ended questions were used, and the quantitative and qualitative data obtained were analyzed accordingly. The analysis of the quantitative data, aided with SPSS, were frequency, percentage, and means, whereas the qualitative data were analyzed descriptively. The results showed that the teachers liked the model, and they were willing to design their own lesson plan. The observation data revealed that the classroom learning process became more interactive, and classroom atmosphere was more engaging and natural because the teachers did not stick to the lesson plan made by other teachers.

  1. Go West: Imagining the Oregon Trail. [Lesson Plan].

    Science.gov (United States)

    National Endowment for the Humanities (NFAH), Washington, DC.

    In this lesson plan, students in grades 3-5 compare imagined travel experiences of their own with the actual experiences of 19th-century pioneers on the Oregon Trail. After the 4 lessons students will have: (1) learned about the pioneer experience on the Oregon Trail; (2) compared and contrasted modern-day travel experiences with those of the 19th…

  2. Righting Your Future: LRE Lesson Plans for Today and Tomorrow.

    Science.gov (United States)

    CRADLE: Center for Research and Development in Law-Related Education, Winston-Salem, NC.

    A compilation of more than 50 lesson plans on law related education, these materials were written by middle school and high school teachers from around the United States. The lessons cover a broad range of topics including "DNA Fingerprints and the Constitutional Right to Privacy"; "Censorship and Book Banning in Public Schools"; "The Death…

  3. Lessons learned in planning the Canadian Nuclear Legacy Liabilities Program

    International Nuclear Information System (INIS)

    Stephens, M.; Brooks, S.; Miller, J.; Neal, P.; Mason, R.

    2011-01-01

    In 2006, Atomic Energy of Canada Limited (AECL) and Natural Resources Canada (NRCan) began implementing a $7B CDN, 70-year Nuclear Legacy Liabilities Program (NLLP) to deal with legacy decommissioning and environmental issues at AECL nuclear sites. The objective of the NLLP is to safely and cost-effectively reduce the nuclear legacy liabilities and associated risks based on sound waste management and environmental principles in the best interest of Canadians. The NLLP comprises a number of interlinked decommissioning, waste management and environmental restoration activities that are being executed at different sites by various technical groups. Many lessons about planning and executing such a large, diverse Program have been learned in planning the initial five-year 'start-up' phase (concluded 2011 March), in planning the three-year second phase (currently being commenced), and in planning individual and interacting activities within the Program. The activities to be undertaken in the start-up phase were planned by a small group of AECL technical experts using the currently available information on the liabilities. Several internal and external reviews of the Program during the start-up phase examined progress and identified several improvements to planning. These improvements included strengthening communications among the groups within the Program, conducting more detailed advance planning of the interlinked activities, and being cautious about making detailed commitments for activities for which major decisions had yet to be made. The second phase was planned by a dedicated core team. More and earlier input was solicited from the suppliers than in the planning for the first phase. This was to ensure that the proposed program of work was feasible, and to be able to specify in more detail the resources that would be required to carry it out. The NLLP has developed several processes to assist in the detailed planning of the numerous projects and

  4. Neste plans three projects

    International Nuclear Information System (INIS)

    Anon.

    1993-01-01

    Neste Chemicals (Helsinki) is discussing three joint ventures with local authorities in China, says Mikko Haapavaara, v.p./Asia. The projects should help the Finnish producer to increase sales in Asia by a considerable amount by 2000, he says. The plan involves production of polyethylene (PE), unsaturated polyester resins and PE compounding-all core operations. Sites have not been selected, but Shanghai is the favored location for the PE operations. The company is also looking at a site in the south, near Hong Kong, and at locations near Beijing. The PE plant would need to be near an ethylene unit, says Haapavaara. The PE resin plant would be designed to produce about 150,000 m.t./year and would cost about No. 150 million. A part of the output would need to be exported to take care of the financing, the company says. A feasibility study now under way with the potential Chinese partners should be completed by the end of March. The plant would use Neste's linear low-density PE process, proved in a world-scale plant at Beringen, Belgium. The compounding units would produce specialty PE material for the wire and cable and pipe industry. The company is a joint venture partner in a propane dehydrogenation/polypropylene (PP) plant and a minority partner in a Qualipoly, the 20,000 m.t./year unsaturated polyester resin producer

  5. Project Cost Estimation for Planning

    Science.gov (United States)

    2010-02-26

    For Nevada Department of Transportation (NDOT), there are far too many projects that ultimately cost much more than initially planned. Because project nominations are linked to estimates of future funding and the analysis of system needs, the inaccur...

  6. The Project of Planning

    DEFF Research Database (Denmark)

    Flyvbjerg, Bent

    1986-01-01

    This article contains an interview with John Friedmann. The interview covers two core areas in John Friedmann's work: (a) The history of planning, from the beginning of the industrial era till today and (b) radical planning and social mobilization. In relation to radical planning and social mobil...

  7. [Economics] Introductory Lesson (Begin Day One). Lesson Plan.

    Science.gov (United States)

    Lewin, Roland

    This introductory lesson on teaching economics concepts contains sections on the following: purpose; objectives; time; materials needed; and step-by-step classroom procedures. The focus is on the economic problem of scarcity and opportunity costs. Attached is an original skit, "There's no such thing as a free lunch," and a chart that…

  8. Text Linguistics in Research Papers Prepared by University Students: Teaching through Lesson Plans and Textbooks

    Directory of Open Access Journals (Sweden)

    Manuel Albarrán-Santiago

    2015-01-01

    Full Text Available This research project revolves around the properties of text linguistics under a qualitative approach.  The author analyzed drafts of a research paper by two university students as well as lesson plans and textbooks of high school Spanish Language and Literature courses and lesson plans of courses from the Licentiate degree in Education.  According to the information from the drafts, students struggle with coherence and cohesion in writing; however, they succeed in choosing the correct language for the type of writing.  Difficulties are most likely due to fact that this topic is not included in secondary education plans and is not commonly addressed in textbooks or university classes.  In conclusion, teachers should include the properties of text linguistics in their lesson plans in order to help students overcome these difficulties.

  9. Project Specific Quality Assurance Plan

    International Nuclear Information System (INIS)

    Pedersen, K.S.

    1995-01-01

    This Quality Assurance Project Plan (QAPP) identifies the Westinghouse Hanford Co. (WHC) Quality Assurance (QA) program requirements for all contractors involved in the planning and execution of the design, construction, testing and inspection of the 200 Area Effluent BAT/AKART Implementation, Project W-291

  10. Why does project planning fail

    International Nuclear Information System (INIS)

    Foley, M.; Luciano, G.

    1991-01-01

    The technology of project controls have become increasingly sophisticated. Some say that the technological advancements of the Nineteen-Eighties represented a maturation of project control tools. Others say that the advancements were merely bells and whistles that added little or nothing to the project management process. Above it all, as we enter the Nineties, there is a popular outcry to get back to the basics of planning. The genesis of this outcry is the sobering impact of significant cost overruns and schedule extensions, even on projects that have employed the most advanced project control tools and systems. This paper examines the merits of taking a strategic approach to the project planning process. Within that context, there are basic goals of planning which are enduring through the life cycle of the project. Key reasons for failure and inability to achieve the goals of project planning are explained. By examining the goals of project planning and the reasons for failure, insight is provided into the role of project controls specialists and sophisticated project control tools in meeting the challenges of complex project management in the 1990's

  11. English language-in-education: A lesson planning model for subject ...

    African Journals Online (AJOL)

    English language-in-education: A lesson planning model for subject teachers. ... lack of critical academic language skills in English as the Language of Learning and ... process of lesson design and the 'forward' process of lesson presentation.

  12. Understanding public sexual harassment : lesson plans and session guidance, key Stages 3 & 4.

    OpenAIRE

    Vera-Gray, F.; Bullough, J.

    2017-01-01

    These lesson plans have been written by Dr. Fiona Vera-Gray at Durham University and Jayne Bullough from Rape Crisis South London (RASASC). They were created through a partnership project with Doll’s Eye Theatre, Purple Drum, RASASC, Dr. Maria Garner, and Dr. Fiona Vera-Gray. Lessons on public sexual harassment were drawn from the work of Dr. Vera-Gray at Durham University. The project was made possible by Durham Law School’s Impact Acceleration Grant from the Economics and ...

  13. Project Quality Plan

    DEFF Research Database (Denmark)

    Sandborg-Petersen, Ulrik; Øhrstrøm, Peter

    This document defines the procedures, standards, and strategies which will be used to ensure high standards of quality of the work produced within the HANDS project. It contains the following sections...

  14. Lessons learned applying CASE methods/tools to Ada software development projects

    Science.gov (United States)

    Blumberg, Maurice H.; Randall, Richard L.

    1993-01-01

    This paper describes the lessons learned from introducing CASE methods/tools into organizations and applying them to actual Ada software development projects. This paper will be useful to any organization planning to introduce a software engineering environment (SEE) or evolving an existing one. It contains management level lessons learned, as well as lessons learned in using specific SEE tools/methods. The experiences presented are from Alpha Test projects established under the STARS (Software Technology for Adaptable and Reliable Systems) project. They reflect the front end efforts by those projects to understand the tools/methods, initial experiences in their introduction and use, and later experiences in the use of specific tools/methods and the introduction of new ones.

  15. Planning and Managing Drupal Projects

    CERN Document Server

    Nordin, Dani

    2011-01-01

    If you're a solo website designer or part of a small team itching to build interesting projects with Drupal, this concise guide will get you started. Drupal's learning curve has thrown off many experienced designers, particularly the way it handles design challenges. This book shows you the lifecycle of a typical Drupal project, with emphasis on the early stages of site planning. Learn how to efficiently estimate and set up your own project, so you can focus on ways to make your vision a reality, rather than let project management details constantly distract you. Plan and estimate your projec

  16. Research Planning and Evaluation Project

    International Nuclear Information System (INIS)

    Song, Seunghyun; Kim, Doyang; Ryu, Byunghoon; Lim, Chaeyoung; Song, Leeyoung; Lee, Youngchul; Han, Changsun; Kim, Hackchoon

    2011-12-01

    - To activate R and D through a systematic and impartial evaluation by using information on efficient distribution of research resource, setting project priorities, and measuring achievement against goals produced after research on planning and evaluation system for the government-funded project for KAERI was conducted. - Nuclear R and D project is the representative national R and D project which has been implemented in Korea. For the sustainable development of nuclear energy which supplies about 40% of total electricity generation and the enhancement of it innovative ability in the future, a systematic and efficient strategy in the planning stage is required

  17. Lessons Learned from Past and Ongoing Construction Projects

    International Nuclear Information System (INIS)

    Tabatabai, Omid

    2011-01-01

    Full text of publication follows: The nuclear industry in the U.S. faced many construction quality and design issues in the 1970's and 1980's. In 1984, the NRC issued NUREG-1055, 'Improving Quality and the Assurance of Quality in the Design and Construction of Nuclear Power Plants,' to document the lessons learned from nuclear power plant (NPP) construction in the U.S. In recent years, several countries have begun either planning for or actually constructing new NPPs. For instance, in the U.S., the nuclear industry has submitted several combined license and design certification applications to the NRC for licensing reviews and approval to build 30+ new NPP units. Latest construction experience from countries that are currently building new NPPs indicate that these countries are dealing with challenges that are similar to those issues that caused major quality assurance problems, delays, or even termination of several projects in U.S. in the 70's and 80's. The U.S. NRC is pro-actively taking measures to improve its regulatory programs as well as construction oversight activities before new NPPs construction begin in the U.S. In late 2007, the U.S. NRC's Office of New Reactors established a construction experience program (ConE) to obtain and evaluate construction and operating experience events and to identify the lessons learned from these events. In March 2009, the NRC published an Office Instruction to provide a process for incorporating the lessons learned and insights from the design, construction, and operation of the international and domestic NPPs into the licensing reviews, inspections, and construction of new reactors in the U.S. Additionally, the ConE program staff developed a Web-enabled database to store, manage, and make construction experience information available to all NRC technical reviewers as well as inspectors. Because this database contains information from other countries' regulators that are considered

  18. The German Chernobyl project: Lessons learned

    International Nuclear Information System (INIS)

    Hill, P.; Hille, R.

    1999-01-01

    This report presents results and lessons learned by one of the so far largest assessments of a post-accidental situation. Funded by the Federal Republic of Germany the German Chernobyl Project investigated in the years 1991-1993 the radiological situation in contaminated regions of the Russian Federation, Belarus and Ukraine. Measurements included a mass screening of the population in order to determine the Cesium body burdens of 250,000+ individuals in more than 240 settlements as well as the evaluation of external doses in selected settlements with soil contaminations varying from less than 74 kBq/m 2 to about 3700 kBq/m 2 including some, where decontamination measures had previously been taken. Also in many settlements environmental monitoring was undertaken. For most individuals doses did not exceed the international annual limits set for the general population. Open and comprehensive communication of results was favourably accepted by the public. In a few settlements the radiological situation has been followed up till to date. (author)

  19. Project implementation plan: ASTD remote deployment

    International Nuclear Information System (INIS)

    CRASS, D.W.

    1999-01-01

    This document is the project implementation plan for the ASTD Remote Deployment Project. The Plan identifies the roles and responsibilities for the project and defines the integration between the ASTD Project and the B-Cell Cleanout Project

  20. HANDI 2000 project execution plan

    International Nuclear Information System (INIS)

    BENNION, S.I.

    1999-01-01

    The HANDI 2000 project will meet some of the major objectives and goals of the PHMC Management and Integration Plan, HNF-MP-00/Rev. 11, by integrating the major Hanford business processes and their supporting information systems

  1. Project W-320 ALARA Plan

    International Nuclear Information System (INIS)

    Harty, W.M.

    1995-01-01

    This supporting document establishes the As Low As Reasonable Achievable (ALARA) Plan to be followed during Sluicing Project W-320 design and construction activities to minimize personnel exposure to radiation and hazardous materials

  2. Project W-320 ALARA Plan

    Energy Technology Data Exchange (ETDEWEB)

    Harty, W.M.

    1995-06-06

    This supporting document establishes the As Low As Reasonable Achievable (ALARA) Plan to be followed during Sluicing Project W-320 design and construction activities to minimize personnel exposure to radiation and hazardous materials.

  3. Collaborative Lesson Planning as Professional Development for Beginning Primary Teachers

    Science.gov (United States)

    Bauml, Michelle

    2014-01-01

    This qualitative case study describes how one beginning primary grade teacher benefited from collaborative lesson-planning meetings with her grade-level colleagues. The teacher accumulated knowledge of curriculum, pedagogy, and professional contexts as she participated in planning meetings each week during her first year of teaching. Furthermore,…

  4. Route planning algorithms: Planific@ Project

    Directory of Open Access Journals (Sweden)

    Gonzalo Martín Ortega

    2009-12-01

    Full Text Available Planific@ is a route planning project for the city of Madrid (Spain. Its main aim is to develop an intelligence system capable of routing people from one place in the city to any other using the public transport. In order to do this, it is necessary to take into account such things as: time, traffic, user preferences, etc. Before beginning to design the project is necessary to make a comprehensive study of the variety of main known route planning algorithms suitable to be used in this project.

  5. Jackie Steals Home. Learning Page Lesson Plan.

    Science.gov (United States)

    Pulda, Arnold

    In this lesson, students draw on their previous studies of American history and culture as they analyze primary sources from "Jackie Robinson and Other Baseball Highlights, 1860s-1960s" in the American Memory collection. A close reading of two documents relating to Jackie Robinson's breaking of the racial barrier in professional baseball…

  6. Oil prices: demand and supply. Lesson plan

    OpenAIRE

    anonymous

    2005-01-01

    Upon completion of this lesson, students will be able to list the determinants of demand and supply, recognize which factors will cause demand curves or supply curves to shift, determine equilibrium using a demand/supply graph, and show the effects on price and quantity when equilibrium changes.

  7. [Heritage Education Lesson Plans and Slide Presentations].

    Science.gov (United States)

    Van Buren, Maurie

    Field tested in 27 schools and in grades four through twelve, this teaching unit stresses heritage education through the study of southern U.S. architectural styles for homes from the pioneer log structures to the 1950s ranch home. Each of the four lessons in this unit focuses around a slide presentation of 20 slides designed to fit into one…

  8. Quality Assurance Project Plan for Citizen Science Projects

    Science.gov (United States)

    The Quality Assurance Project Plan is necessary for every project that collects or uses environmental data. It documents the project planning process and serves as a blueprint for how your project will run.

  9. Project Execution Plan

    International Nuclear Information System (INIS)

    1999-01-01

    Created in 1989 to address over 50 years of environmental liabilities arising out of nuclear weapons production and testing in the United States since World War II, the U.S. Department of Energy's (DOE's) Environmental Management (EM) Programs decade-long effort to reduce the costs of those environmental liabilities, collectively known as DOE's ''environmental mortgage,'' includes past as well as future cleanup costs associated with environmental contamination, hazardous and radioactive materials and wastes, contaminated buildings and facilities, and their associated risks. Tasked with the bulk of these cleanup efforts, the U.S. Department of Energy, Nevada Operations Office's (DOE/NV's), Nevada Environmental Restoration Project (NV ERP) is attempting to complete applicable corrective actions at inactive contaminated sites and facilities managed by DOE/NV, while at the same time protecting human health and the environment. Regulated under the Federal Facility Agreement and Consent Order, the objectives of the NV ERP are to identify the nature and extent of the contamination, determine its potential risk to the public and the environment, and to perform the necessary corrective actions in compliance with this and other state and federal regulations, guidelines, and requirements. Associated with this vast effort are approximately 2,000 sites both on and off of the Nevada Test Site (NTS) that were used primarily for nuclear testing and are addressed in the NV ERP. This includes sites that were underground areas where tests were actually conducted, contaminated surface soils resulting from aboveground testing activities, and sites that supported other related testing hardware paraphenalia and/or NTS real estate properties (e.g., underground storage tanks, leachfields, landfills, contaminated waste areas, injection wells, muckpiles, and ponds). To assist in this effort, a NV ERP Team was assembled which is composed of organizations from both the public and private

  10. Project Surveillance and Maintenance Plan

    International Nuclear Information System (INIS)

    1985-09-01

    The Project Surveillance and Maintenance Plan (PSMP) describes the procedures that will be used by the US Department of Energy (DOE), or other agency as designated by the President to verify that inactive uranium tailings disposal facilities remain in compliance with licensing requirements and US Environmental Protection Agency (EPA) standards for remedial actions. The PSMP will be used as a guide for the development of individual Site Surveillance and Maintenance Plans (part of a license application) for each of the UMTRA Project sites. The PSMP is not intended to provide minimum requirements but rather to provide guidance in the selection of surveillance measures. For example, the plan acknowledges that ground-water monitoring may or may not be required and provides the [guidance] to make this decision. The Site Surveillance and Maintenance Plans (SSMPs) will form the basis for the licensing of the long-term surveillance and maintenance of each UMTRA Project site by the NRC. Therefore, the PSMP is a key milestone in the licensing process of all UMTRA Project sites. The Project Licensing Plan (DOE, 1984a) describes the licensing process. 11 refs., 22 figs., 8 tabs

  11. Conservation Action Planning: Lessons learned from the St. Marys River watershed biodiversity conservation planning process

    Science.gov (United States)

    Patterson, Tamatha A.; Grundel, Ralph

    2014-01-01

    Conservation Action Planning (CAP) is an adaptive management planning process refined by The Nature Conservancy (TNC) and embraced worldwide as the Open Standards for the Practice of Conservation. The CAP process facilitates open, multi-institutional collaboration on a common conservation agenda through organized actions and quantified results. While specifically designed for conservation efforts, the framework is adaptable and flexible to multiple scales and can be used for any collaborative planning effort. The CAP framework addresses inception; design and development of goals, measures, and strategies; and plan implementation and evaluation. The specific components of the CAP include defining the project scope and conservation targets; assessing the ecological viability; ascertaining threats and surrounding situation; identifying opportunities and designing strategies for action; and implementing actions and monitoring results. In 2007, TNC and a multidisciplinary graduate student team from the University of Michigan's School of Natural Resources and Environment initiated a CAP for the St. Marys River, the connecting channel between Lake Superior and Lake Huron, and its local watershed. The students not only gained experience in conservation planning, but also learned lessons that notably benefited the CAP process and were valuable for any successful collaborative effort—a dedicated core team improved product quality, accelerated the timeline, and provided necessary support for ongoing efforts; an academic approach in preparation for engagement in the planning process brought applicable scientific research to the forefront, enhanced workshop facilitation, and improved stakeholder participation; and early and continuous interactions with regional stakeholders improved cooperation and built a supportive network for collaboration.

  12. Project Execution Plan, Rev. 3

    International Nuclear Information System (INIS)

    IT Corporation, Las Vegas

    2002-01-01

    This plan addresses project activities encompassed by the U.S. Department of Energy's (DOE's), National Nuclear Security Administration Nevada Operations Office, Environmental Restoration Division and conforms to the requirements contained in the Life-Cycle Asset Management, DOE Order 430.1A; The Joint Program Office Policy on Project Management in Support of DOE Order 430.1; Program and Project Management for the Acquisition of Capital Assets, DOE Order 413.3; the Project Execution and Engineering Management Planning Guide, GPG-FM-010; and other applicable Good Practice Guides; and the FY 2001 Integrated Planning, Accountability, and Budgeting System Policy Guidance. The plan also reflects the milestone philosophies of the Federal Facility Agreement and Consent Order, as agreed to by the State of Nevada, the DOE, and the U.S. Department of Defense; and traditional project management philosophies such as the development of life-cycle costs, schedules, and work scope; identification o f roles and responsibilities; and baseline management and controls

  13. PACTEL OECD project planning (PACO). PACTEL OECD project planning

    Energy Technology Data Exchange (ETDEWEB)

    Kouhia, V.; Purhonen, H. [Lappeenranta University of Technology (Finland)

    2004-07-01

    OECD launched the SETH project to investigate issues relevant for accident prevention and management and to ensure the existence of integral thermal hydraulic test facilities. The facilities included in the SETH project are PKL from Germany and PANDA from Switzerland. At the early stages of the SETH project an idea was raised to exploit the PACTEL facility in a similar OECD project. Without any external funding the analytical work in the required extent would not be possible within Lappeenranta University of Technology, the party responsible of operating PACTEL. This fact directed the PACO project proposal to be conducted for the SAFIR programme. The aim of the PACO project is to prepare a project proposal to OECD of a PACTEL related project. To attain this objective some preliminary analyses have to be performed to ensure the relevancy of the proposed topic. The low power situation, i.e. midloop state was chosen to be the topic in the PACO studies and project planning basis. The plan is to use PACTEL to examine vertical steam generator behaviour during the midloop operation and the following loss of residual heat removal system transient. Such a possibility is acknowledged with special alterations to PACTEL. The APROS code version 5.04.07 was selected as a tool for the preanalyses. The virtual simulation of the chosen experimental situation would give a preconception on the phenomena to be expected and the progression of the transient. Originally the PACO project was planned to continue only for a few months, ending up with the project proposal to OECD during the summer time 2004. During the pre-calculation process it became obvious that the time expected was not enough to establish good pre-calculation results. The reasons for this relates to time used to learn and adapt the use of the chosen code, improvements and corrections in modelling as well as the code ability to manage the special conditions defined for the project topic. Another aspect on completing a

  14. Quality planning in Construction Project

    Science.gov (United States)

    Othman, I.; Shafiq, Nasir; Nuruddin, M. F.

    2017-12-01

    The purpose of this paper is to investigate deeper on the factors that contribute to the effectiveness of quality planning, identifying the common problems encountered in quality planning, practices and ways for improvements in quality planning for construction projects. This paper involves data collected from construction company representatives across Malaysia that are obtained through semi-structured interviews as well as questionnaire distributions. Results shows that design of experiments (average index: 4.61), inspection (average index: 4.45) and quality audit as well as other methods (average index: 4.26) rank first, second and third most important factors respectively.

  15. From Autopsy to Biopsy: A Metacognitive View of Lesson Planning and Teacher Trainees in ELT

    Science.gov (United States)

    Liyanage, Indika; Bartlett, Brendan John

    2010-01-01

    Lesson planning and implementation of those plans are complex and cognitively demanding for English Language Teacher trainees preparing for the profession. Many find it difficult to develop a lesson holistically and to maintain alignment across aims, procedural steps, and evaluation when planning and implementing a lesson. We attempted to address…

  16. The Education and Lifestyle of the Chinese Literati. Lesson Plan.

    Science.gov (United States)

    Smithsonian Institution, Washington, DC. Arthur M. Sackler Gallery.

    This teaching package describes the education and lifestyle of the Chinese literati, popular from the Ming to the Qing dynasties (1368-1911). It consists of four lesson plans and a teacher's guide to a slide set. The latter illustrates painting formats popular during the late Ming period (1573-1644), hanging scrolls, handscrolls, the album leaf,…

  17. "Split" Character Studies in "Crime and Punishment." [Lesson Plan].

    Science.gov (United States)

    O'Brien, Mary

    Based on Fyodor Dostoevsky's novel "Crime and Punishment," this lesson plan presents activities designed to help students understand that: a close study of the characters of a literary classic will yield important clues to an understanding of the work as a whole; an effective analysis of stylistic devices depends upon selection and interpretation…

  18. Validitas Lesson Plan Berbasis Multiple Intelligences untuk Pembelajaran Matematika

    Directory of Open Access Journals (Sweden)

    Vigih Hery Kristanto

    2017-12-01

    Full Text Available The purpose of this research is to know the validity of Lesson Plan based on multiple intelligences for learning mathematics in junior high school students. This research is a simple research with qualitative type. The validity of Lesson Plan is seen through two aspects, namely the linguistic aspect and the substance (content aspect. Thus, the instrument used in this research is the Linguistic Aspects Validation Guidance and the Substance Validation Guidelines (contents Guidance. Validation is done by two validators Lingusitic expert field and Mathematics expert field. The results showed that the validity of linguistic aspects of 3.35 and the validity of the substance (content of 3.82, so it can be concluded Lesson Plan based multiple intelligences for learning mathematics in junior high school students who have been compiled valid based on the language aspect. In addition, Lesson Plan based multiple intelligences for learning mathematics in junior high school students who have been compiled valid based on aspects of substance (content.

  19. 49 Stories That Make an Ultimate STEM Lesson Plan

    Science.gov (United States)

    Mehta, Swati; Mehta, Rohit; Berzina-Pitcher, Inese; Seals, Christopher; Mishra, Punya

    2016-01-01

    In this paper we reviewed what 49 large urban public school district STEM teachers enrolled in a year-long graduate certificate and fellowship program at a large Midwestern university considered as their amazing teaching moments. They were asked to share their amazing teaching moments that would make an Ultimate Lesson Plan in STEM. In smaller…

  20. Figuring Somepin 'bout the Great Depression. Learning Page Lesson Plan.

    Science.gov (United States)

    McElroy, Amy; Pietsch, Chris

    These 10th and 11th grade lessons plans related to the Great Depression and the novel "The Grapes of Wrath" help students to: develop research skills and strategies, such as keyword searches, for finding information; recognize and use the different voices of migrants; and understand the politics of migration and the Great Depression. By…

  1. The Date That Lives in Infamy: Pearl Harbor Lesson Plans.

    Science.gov (United States)

    Department of the Navy, Washington, DC.

    This lesson plan can help teachers and students understand what happened on December 7, 1941, beginning with the first U.S. treaty with Japan in 1854 through the attacks in 1941. Students use primary sources to synthesize information and draw conclusions about the role of the U.S. Navy in foreign policy and to understand how people in 1941 reacted…

  2. "1984": How Much Fact in Fiction? [Lesson Plan].

    Science.gov (United States)

    Hedberg, Betsy

    Based on George Orwell's novel "1984," this lesson plan presents activities designed to help students understand that the historical context of the novel is based on the mood and political climate of 1949 Europe; the society Orwell created and modern society in the United States have similarities and differences; and modern privacy issues and the…

  3. Improving IT Project Portfolio Management: Lessons Learned

    DEFF Research Database (Denmark)

    Pedersen, Keld

    2013-01-01

    The IT PPM improvement process is not well understood, and our knowledge about what makes IT PPM improvement succeed or fail is not well developed. This article presents lessons learned from organizations trying to improve their IT PPM practice. Based on this research IT PPM practitioners are adv...

  4. Planning for high performance project teams

    International Nuclear Information System (INIS)

    Reed, W.; Keeney, J.; Westney, R.

    1997-01-01

    Both industry-wide research and corporate benchmarking studies confirm the significant savings in cost and time that result from early planning of a project. Amoco's Team Planning Workshop combines long-term strategic project planning and short-term tactical planning with team building to provide the basis for high performing project teams, better project planning, and effective implementation of the Amoco Common Process for managing projects

  5. Spent Nuclear Fuel Project Safety Management Plan

    International Nuclear Information System (INIS)

    Garvin, L.J.

    1996-02-01

    The Spent Nuclear Fuel Project Safety Management Plan describes the new nuclear facility regulatory requirements basis for the Spemt Nuclear Fuel (SNF) Project and establishes the plan to achieve compliance with this basis at the new SNF Project facilities

  6. Lessons Learned for Planning and Estimating Operations Support Requirements

    Science.gov (United States)

    Newhouse, Marilyn

    2011-01-01

    Operations (phase E) costs are typically small compared to the spacecraft development and test costs. This, combined with the long lead time for realizing operations costs, can lead projects to focus on hardware development schedules and costs, de-emphasizing estimation of operations support requirements during proposal, early design, and replan cost exercises. The Discovery and New Frontiers (D&NF) programs comprise small, cost-capped missions supporting scientific exploration of the solar system. Even moderate yearly underestimates of the operations costs can present significant LCC impacts for deep space missions with long operational durations, and any LCC growth can directly impact the programs ability to fund new missions. The D&NF Program Office at Marshall Space Flight Center recently studied cost overruns for 7 D&NF missions related to phase C/D development of operational capabilities and phase E mission operations. The goal was to identify the underlying causes for the overruns and develop practical mitigations to assist the D&NF projects in identifying potential operations risks and controlling the associated impacts to operations development and execution costs. The study found that the drivers behind these overruns include overly optimistic assumptions regarding the savings resulting from the use of heritage technology, late development of operations requirements, inadequate planning for sustaining engineering and the special requirements of long duration missions (e.g., knowledge retention and hardware/software refresh), and delayed completion of ground system development work. This presentation summarizes the study and the results, providing a set of lessons NASA can use to improve early estimation and validation of operations costs.

  7. How to Analyze Routines in Teachers' Thinking Processes during Lesson Planning.

    Science.gov (United States)

    Bromme, Rainer

    A justification for the study of teachers' routines, as they affect the preparation of lesson plans, prefaces this paper on teachers' thought processes during lesson planning. In focusing on the importance of research into teachers' routines, it is pointed out that lesson preparation and classroom routines permit teachers to direct attention to…

  8. Lessons learned in planning the Canadian Nuclear Legacy Liabilities Program

    International Nuclear Information System (INIS)

    Stephens, Michael E.; Brooks, Sheila M.; Miller, Joan M.; Mason, Robert A.

    2011-01-01

    In 2006, Atomic Energy of Canada Limited (AECL) and Natural Resources Canada (NRCan) began implementing a $7B CDN, 70-year Nuclear Legacy Liabilities Program (NLLP) to deal with legacy decommissioning and environmental issues at AECL nuclear sites. The objective of the NLLP is to safely and cost-effectively reduce the nuclear legacy liabilities and associated risks based on sound waste management and environmental principles in the best interest of Canadians. The liabilities include shutdown research and prototype power reactors, fuel handling facilities, radiochemical laboratories, support buildings, radioactive waste storage facilities, and contaminated lands at several sites located across eastern Canada from Quebec to Manitoba. The largest site, Chalk River Laboratories (CRL) in Ontario, will continue as an operational nuclear site for the foreseeable future. Planning and delivery of the Program is managed by the Liability Management Unit (LMU), a group that was formed within AECL for the purpose. The composition and progress of the NLLP has been reported in recent conferences. The NLLP comprises a number of interlinked decommissioning, waste management and environmental restoration activities that are being executed at different sites, and by various technical groups as suppliers to the LMU. Many lessons about planning and executing such a large, diverse Program have been learned in planning the initial five-year 'start-up' phase (which will conclude 2011 March), in planning the five-year second phase (which is currently being finalized), and in planning individual and interacting activities within the Program. The activities to be undertaken in the start-up phase were planned by a small group of AECL technical experts using the currently available information on the liabilities. Progress in executing the Program was slower than anticipated due to less than ideal alignment between some planned technical solutions and the actual requirements, as well as the

  9. Tax Cut Legislation: What's Fair? Lesson Plan.

    Science.gov (United States)

    Foundation for Teaching Economics, Davis, CA.

    Front and center in 2001 domestic policy debates is President George W. Bush's proposed tax relief plan. The U.S. federal tax is a progressive tax code, predicated on the assumption that "people who are most able to pay should pay the most." A progressive tax system makes an individual's tax bill increase faster than his/her income. The…

  10. Financial Planning: Strategies and Lessons Learned

    Science.gov (United States)

    Brinkman, Paul T.; Morgan, Anthony W.

    2010-01-01

    Financial planning is an increasingly critical function within higher education institutions. Its pivotal and multifaceted role is described in detail in this article. Based on many years of experience in higher education, the authors offer practical suggestions on how best to locate the function organizationally and perform it effectively. They…

  11. Advanced Life Support Project Plan

    Science.gov (United States)

    2002-01-01

    Life support systems are an enabling technology and have become integral to the success of living and working in space. As NASA embarks on human exploration and development of space to open the space frontier by exploring, using and enabling the development of space and to expand the human experience into the far reaches of space, it becomes imperative, for considerations of safety, cost, and crew health, to minimize consumables and increase the autonomy of the life support system. Utilizing advanced life support technologies increases this autonomy by reducing mass, power, and volume necessary for human support, thus permitting larger payload allocations for science and exploration. Two basic classes of life support systems must be developed, those directed toward applications on transportation/habitation vehicles (e.g., Space Shuttle, International Space Station (ISS), next generation launch vehicles, crew-tended stations/observatories, planetary transit spacecraft, etc.) and those directed toward applications on the planetary surfaces (e.g., lunar or Martian landing spacecraft, planetary habitats and facilities, etc.). In general, it can be viewed as those systems compatible with microgravity and those compatible with hypogravity environments. Part B of the Appendix defines the technology development 'Roadmap' to be followed in providing the necessary systems for these missions. The purpose of this Project Plan is to define the Project objectives, Project-level requirements, the management organizations responsible for the Project throughout its life cycle, and Project-level resources, schedules and controls.

  12. Collecting lessons learned : How project-based organizations in the oil and gas industry learn from their projects

    NARCIS (Netherlands)

    Buttler, T.

    2016-01-01

    Project-based organizations collect lessons learned in order to improve the performance of projects. They aim to repeat successes by using positive lessons learned, and to avoid repeating negative experiences by using negative lessons learned. Cooke-Davies (2002) claimed that the ability to learn

  13. SNF Project Engineering Process Improvement Plan

    International Nuclear Information System (INIS)

    DESAI, S.P.

    2000-01-01

    This plan documents the SNF Project activities and plans to support its engineering process. It describes five SNF Project Engineering initiatives: new engineering procedures, qualification cards process; configuration management, engineering self assessments, and integrated schedule for engineering activities

  14. Strategic planning for remediation projects

    International Nuclear Information System (INIS)

    Tapp, J.W.

    1995-01-01

    Remediation projects may range from a single leaking storage tank to an entire plant complex or producing oil and gas field. Strategic planning comes into play when the contamination of soil and groundwater is extensive. If adjacent landowners have been impacted or the community at large is concerned about the quality of drinking water, then strategic planning is even more important. (1) To manage highly complex interrelated issues--for example, the efforts expended on community relations can alter public opinion, which can impact regulatory agency decisions that affect cleanup standards, which can...and so on. (2) To ensure that all potential liabilities are managed--for example, preparation for the defense of future lawsuits is essential during site investigation and remediation. (3) To communicate with senior management--when the remediation team provides a strategic plan that includes both technical and business issues, senior management has the opportunity to become more involved and make sound policy decisions. The following discusses the elements of a strategic plan, who should participate in it, and the issues that should be considered

  15. QA lessons learned for parameter control from the WIPP Project

    International Nuclear Information System (INIS)

    Richards, R.R.

    1998-01-01

    This paper provides a summary of lessons learned from experiences on the Waste Isolation Pilot Plant (WJPP) Project in implementation of quality assurance controls surrounding inputs for performance assessment analysis. Since the performance assessment (PA) process is inherent in compliance determination for any waste repository, these lessons-learned are intended to be useful to investigators, analysts, and Quality Assurance (QA) practitioners working on high level waste disposal projects. On the WIPP Project, PA analyses for regulatory-compliance determination utilized several inter-related computer programs (codes) that mathematically modeled phenomena such as radionuclide release, retardation, and transport. The input information for those codes are the parameters that are the subject of this paper. Parameters were maintained in a computer database, which was then queried electronically by the PA codes whenever input was needed as the analyses were run

  16. Investment and Project Economics: Contemporary Lessons for ...

    African Journals Online (AJOL)

    Taking up the contemporary challenge to sensitize and synergize instructional, industrial and governmental functionaries along this line are leading global faculties such as the Academy of Project Management (APM), Project Management Institute (PMI), and Business Analyst (BA) Times, amongst others. This work is ...

  17. Project Plan Remote Target Fabrication Refurbishment Project

    International Nuclear Information System (INIS)

    Bell, Gary L.; Taylor, Robin D.

    2009-01-01

    In early FY2009, the DOE Office of Science - Nuclear Physics Program reinstated a program for continued production of 252 Cf and other transcurium isotopes at the Radiochemical Engineering Development Center (REDC) at Oak Ridge National Laboratory (ORNL). The FY2009 major elements of the workscope are as follows: (1) Recovery and processing of seven transuranium element targets undergoing irradiation at the High Flux Isotope Reactor (HFIR) at ORNL; (2) Development of a plan to manufacture new targets for irradiation beginning in early- to mid-FY10 to supply irradiated targets for processing Campaign 75 (TRU75); and (3) Refurbishment of the target manufacturing equipment to allow new target manufacture in early FY10 The 252 Cf product from processing Campaign 74 (recently processed and currently shipping to customers) is expected to supply the domestic demands for a period of approximately two years. Therefore it is essential that new targets be introduced for irradiation by the second quarter of FY10 (HFIR cycle 427) to maintain supply of 252 Cf; the average irradiation period is ∼10 HFIR cycles, requiring about 1.5 calendar years. The strategy for continued production of 252 Cf depends upon repairing and refurbishing the existing pellet and target fabrication equipment for one additional target production campaign. This equipment dates from the mid-1960s to the late 1980s, and during the last target fabrication campaign in 2005- 2006, a number of component failures and operations difficulties were encountered. It is expected that following the target fabrication and acceptance testing of the targets that will supply material for processing Campaign 75 a comprehensive upgrade and replacement of the remote hot-cell equipment will be required prior to subsequent campaigns. Such a major refit could start in early FY 2011 and would take about 2 years to complete. Scope and cost estimates for the repairs described herein were developed, and authorization for the work

  18. Investment and Project Economics: Contemporary Lessons for ...

    African Journals Online (AJOL)

    Toshiba

    contemporary challenge to sensitize and synergize instructional, ... project financial outcomes as underscored in this work. ... Balance of payments. .... Problem diagnosis/solutions. **. *** .... Money, Work, Sex, Kids, and Life's Other Challenges.

  19. IS-ENES project management - lessons learnt

    Science.gov (United States)

    Parinet, Marie; Guglielmo, Francesca; Joussaume, Sylvie

    2017-04-01

    IS-ENES is the distributed e-infrastructure of models, model data and metadata of the European Network for Earth System Modelling (ENES). It has benefitted from two EC FP7 grants and aims towards further European and national funding to achieve sustainability. We highlight here several challenges related to project management that have risen in the course of these two project-phases spanning 8 years. Some challenges are related to the heterogeneity of the activities within IS-ENES, with different groups working on very diverse activities, not necessarily strictly interdependent. An immediate consequence is the need of implementing and setting up in early phases of the project efficient collection and circulation of information to preserve and reinforce the systemic view of the infrastructure as a whole and the pursuit of common goals, including coordinated provision of services. Toward and beyond such common goals, managing IS-ENES, covering both scientific and more strictly management-related aspects, implies a double-paced approach: besides setting up efficient project workflow, there is the need of setting up longer term objectives. This implies, within the project lifetime, to elaborate and implement a coherent organizational (consistent with scientific goals, funding schemes, research and technology landscape) strategy to pursue these goals beyond the project itself. Furthermore, a series of more generic project management challenges will also be listed and can be gathered around 3 main objectives: ease the internal processes in order to optimize the work, anticipate delays and budget issues, and motivate the project teams by ensuring an efficient internal and external communication.

  20. Project planning and project management of Baseball II-T

    International Nuclear Information System (INIS)

    Kozman, T.A.; Chargin, A.K.

    1975-01-01

    The details of the project planning and project management work done on the Baseball II-T experiment are reviewed. The LLL Baseball program is a plasma confinement experiment accomplished with a superconducting magnet in the shape of a baseball seam. Both project planning and project management made use of the Critical Path Management (CPM) computer code. The computer code, input, and results from the project planning and project management runs, and the cost and effectiveness of this method of systems planning are discussed

  1. BiteScis: Connecting K-12 teachers with science graduate students to produce lesson plans on modern science research

    Science.gov (United States)

    Battersby, Cara

    2016-01-01

    Many students graduate high school having never learned about the process and people behind modern science research. The BiteScis program addresses this gap by providing easily implemented lesson plans that incorporate the whos, whats, and hows of today's scienctific discoveries. We bring together practicing scientists (motivated graduate students from the selective communicating science conference, ComSciCon) with K-12 science teachers to produce, review, and disseminate K-12 lesson plans based on modern science research. These lesson plans vary in topic from environmental science to neurobiology to astrophysics, and involve a range of activities from laboratory exercises to art projects, debates, or group discussion. An integral component of the program is a series of short, "bite-size" articles on modern science research written for K-12 students. The "bite-size" articles and lesson plans will be made freely available online in an easily searchable web interface that includes association with a variety of curriculum standards. This ongoing program is in its first year with about 15 lesson plans produced to date.

  2. Medical faculty members' attitude on lesson planning Semnan University of Medical Sciences

    Directory of Open Access Journals (Sweden)

    Masomeh Saberian

    2003-01-01

    Full Text Available Background: Lesson planning has a distinct role in enhancing education quality, as well as maintaining the friendly and dynamic atmosphere of the academic environment and increasing student's initiatives for achieving better educational attainments. Lesson planning is a process for defining the goals, understanding the needs, and specifying available tools and possible limitations. Lesson planning is a written description of this process, which shows the materials, the route, the time, and the place of instructions, as well as a method for evaluating students. Purpose: to identify the attitudes of Semnan University of Medical Sciences (SUMS on lesson planning. Methods: Fifty-three faculty members of the SUMS participated in this study. A questionnaire was used, which contained 8 demographic questions, and 24 r questions for identification the faculty members' attitude. Questionnaires were distributed among the faculty members in sealed envelopes, without denoting their names. The questionnaires were gathered after being completed. Results were analyzed by calculating the mean, standard deviation, absolute and relative frequencies, and using Chi-square and Fischer exact test at the level of 5%. Results: II was shown that 88% of faculty members favoured lesson planning before the beginning of the semester. But they found lesson planning a difficult task, because of their heavy workload. Of the faculty members, 60.4% organized their teaching classes according to a designed lesson plan, and believed that it did affect the quality of their teaching, but 49.1% disagreed with distributing the designed lesson plan among the students. Discussion: Although professor favoured lesson planning and find it necessary to work according to such a plan, workload and lack of knowledge are defined as two main obstacles in doing so. It is believed that by decreasing the professor's workload and provision of lesson planning workshops, these problems could be solved

  3. Implementing change: lessons from five development projects

    DEFF Research Database (Denmark)

    Riis, J. O.; Hildebrandt, S.; Andreasen, Mogens Myrup

    2001-01-01

    The aim of this paper is firstly to report on what we have observed by following major improvement and development projects in five industrial enterprises. In particular, the authors shall focus on issues which have often been addressed in Danish enterprises, namely the participation of employees...... with organizational changes. Thirdly, four paradoxes for managing development projects are presented; they may serve as guidelines for coping with the complexity and uncertainty of change processes......The aim of this paper is firstly to report on what we have observed by following major improvement and development projects in five industrial enterprises. In particular, the authors shall focus on issues which have often been addressed in Danish enterprises, namely the participation of employees...... in the change process, the role of a vision of the future company; and organizational learning processes taking place during the development project. Secondly, different interpretation models will be employed in an effort to broaden the understanding of the many facets and viewpoints associated...

  4. Organising smart city projects : lessons from Amsterdam

    NARCIS (Netherlands)

    van Winden, Willem; Oskam, Inge; van den Buuse, Daniel; Schrama, Wieke; van Dijck, Egbert-Jan

    2016-01-01

    We studied 12 smart city projects in Amsterdam, and –among other things- analysed their upscaling potential and dynamics. Here are some of our findings: First, upscaling comes in various forms: rollout, expansion and replication. In roll-out, a technology or solution that was successfully tested and

  5. Adoption of Building Information Modelling in project planning risk management

    Science.gov (United States)

    Mering, M. M.; Aminudin, E.; Chai, C. S.; Zakaria, R.; Tan, C. S.; Lee, Y. Y.; Redzuan, A. A.

    2017-11-01

    An efficient and effective risk management required a systematic and proper methodology besides knowledge and experience. However, if the risk management is not discussed from the starting of the project, this duty is notably complicated and no longer efficient. This paper presents the adoption of Building Information Modelling (BIM) in project planning risk management. The objectives is to identify the traditional risk management practices and its function, besides, determine the best function of BIM in risk management and investigating the efficiency of adopting BIM-based risk management during the project planning phase. In order to obtain data, a quantitative approach is adopted in this research. Based on data analysis, the lack of compliance with project requirements and failure to recognise risk and develop responses to opportunity are the risks occurred when traditional risk management is implemented. When using BIM in project planning, it works as the tracking of cost control and cash flow give impact on the project cycle to be completed on time. 5D cost estimation or cash flow modeling benefit risk management in planning, controlling and managing budget and cost reasonably. There were two factors that mostly benefit a BIM-based technology which were formwork plan with integrated fall plan and design for safety model check. By adopting risk management, potential risks linked with a project and acknowledging to those risks can be identified to reduce them to an acceptable extent. This means recognizing potential risks and avoiding threat by reducing their negative effects. The BIM-based risk management can enhance the planning process of construction projects. It benefits the construction players in various aspects. It is important to know the application of BIM-based risk management as it can be a lesson learnt to others to implement BIM and increase the quality of the project.

  6. Patient and Stakeholder Engagement in the PCORI Pilot Projects: Description and Lessons Learned.

    Science.gov (United States)

    Forsythe, Laura P; Ellis, Lauren E; Edmundson, Lauren; Sabharwal, Raj; Rein, Alison; Konopka, Kristen; Frank, Lori

    2016-01-01

    Patients and healthcare stakeholders are increasingly becoming engaged in the planning and conduct of biomedical research. However, limited research characterizes this process or its impact. We aimed to characterize patient and stakeholder engagement in the 50 Pilot Projects funded by the Patient-Centered Outcomes Research Institute (PCORI), and identify early contributions and lessons learned. A self-report instrument was completed by researchers between 6 and 12 months following project initiation. Forty-seven principal investigators or their designees (94 % response rate) participated in the study. MAIN MEASURES Self-report of types of stakeholders engaged, stages and levels of engagement, facilitators and barriers to engagement, lessons learned, and contributions from engagement were measured. Most (83 %) reported engaging more than one stakeholder in their project. Among those, the most commonly reported groups were patients (90 %), clinicians (87 %), health system representatives (44 %), caregivers (41 %), and advocacy organizations (41 %). Stakeholders were commonly involved in topic solicitation, question development, study design, and data collection. Many projects engaged stakeholders in data analysis, results interpretation, and dissemination. Commonly reported contributions included changes to project methods, outcomes or goals; improvement of measurement tools; and interpretation of qualitative data. Investigators often identified communication and shared leadership strategies as "critically important" facilitators (53 and 44 % respectively); lack of stakeholder time was the most commonly reported challenge (46 %). Most challenges were only partially resolved. Early lessons learned included the importance of continuous and genuine partnerships, strategic selection of stakeholders, and accommodation of stakeholders' practical needs. PCORI Pilot Projects investigators report engaging a variety of stakeholders across many stages of research, with specific

  7. Planning, managing and organizing the decommissioning of nuclear facilities: Lessons learned

    International Nuclear Information System (INIS)

    2004-05-01

    This publication is intended to encourage the development and improvement of decommissioning planning and management techniques, with the focus on organizational aspects, reduce the duplication of efforts by different parties by transfer of experience and know-how, and provide useful results for those Member States planning or implementing decommissioning projects. In general it can be stated that any decommissioning project can be completed without any deleterious effects on the safety of the workforce and the public or any identifiable impact on the environment. However, timeliness and cost-effectiveness are not always optimal. It has been noted on several occasions that the major weakness in decommissioning projects (as well as in other industrial projects) is often not the lack of technologies, but rather poor planning and management. This publication intends to stimulate awareness of the need for early and efficient planning and to foster developments in management and organization in association with planned or ongoing decommissioning projects. A companion report on Organization and Management for Decommissioning of Large Nuclear Facilities was published by the IAEA in 2000 (Technical Report Series (TRS) No. 399). That TRS provides generic guidance on organizational and management aspects. This TECDOC is complementary to the existing report in that it highlights practical experience - in particular, typical issues, evidence of poor management, undue delays, and lack of timely funding - and distils lessons learned from this experience

  8. Quality Assurance Project Plan for Facility Effluent Monitoring Plan activities

    International Nuclear Information System (INIS)

    Frazier, T.P.

    1994-01-01

    This Quality Assurance Project Plan addresses the quality assurance requirements for the activities associated with the Facility Effluent Monitoring Plans, which are part of the overall Hanford Site Environmental Protection Plan. This plan specifically applies to the sampling and analysis activities and continuous monitoring performed for all Facility Effluent Monitoring Plan activities conducted by Westinghouse Hanford Company. It is generic in approach and will be implemented in conjunction with the specific requirements of the individual Facility Effluent Monitoring Plans

  9. Health Care Consumerism: Lessons My 401(k) Plan Taught Me.

    Science.gov (United States)

    Steinberg, Allen T

    2015-01-01

    Changes to the U.S. health care system are here. As we think about how individuals will pay for health care--while actively employed and while retired--our experiences with 401(k) plans provide some valuable lessons. In order to support employees in this new health care world--a challenge arguably more daunting than the 401(k) challenge we faced 20 years ago--some very different types of support are needed. Employers should consider providing their employees with the resources to manage health care changes.

  10. Spent Nuclear Fuel project interface control plan

    International Nuclear Information System (INIS)

    Reilly, M.A.

    1995-01-01

    This implementation process philosophy is in keeping with the ongoing reengineering of the WHC Controlled Manuals to achieve interface control within the SNF Project. This plan applies to all SNF Project sub-project to sub-project, and sub-project to exteranl (both on and off the Hanford Site) interfaces

  11. Project structure plan requirements for the deconstruction projects

    International Nuclear Information System (INIS)

    Petrasch, Peter; Schmitt, Christian; Stapf, Meike

    2011-01-01

    The deconstruction of nuclear facilities requires due to the particular conditions and the size of the project a special project planning. The authors analyze the possible requirements to be fulfilled by a project structure plan for nuclear facilities, including personnel resources, organization structure, budget questions, operation and project oriented measures, possibility of modifications and supplements. Further topics include controlling and project realization procedures, documentation, third party activities (authorities, consultants, surveyors), logistics and transport, and radiation protection issues. Several questions remain for plants-specific planning, including the integration of the plant personnel, administrative work, project management, economic and financial issues, radioactive waste management issues.

  12. Worldwide Overview of Lessons Learned from Decommissioning Projects

    International Nuclear Information System (INIS)

    Laraia, Michele

    2008-01-01

    With an increasing number of radioactive facilities and reactors now reaching the end of their useful life and being taken out of service, there is a growing emphasis worldwide on the safe and efficient decommissioning of such plants. There is a wealth of experience already gained in decommissioning projects for all kinds of nuclear facilities. It is now possible to compare and discuss progress and accomplishments worldwide. In particular, rather than on the factual descriptions of projects, technologies and case histories, it is important to focus on lessons learned: in this way, the return of experience is felt to effectively contribute to progress. Key issues - inevitably based on a subjective ranking - are presented in this paper. Through the exchange of lessons learned, it is possible to achieve full awareness of the need for resources for and constraints of safe and cost-effective decommissioning. What remains now is the identification of specific, remaining issues that may hinder or delay the smooth progress of decommissioning. To this end, lessons learned provide the necessary background information; this paper tries to make extensive use of practical experience gained by the international community

  13. Provider-Sponsored Health Plans: Lessons Learned over Three Decades.

    Science.gov (United States)

    Breon, Richard C

    2016-01-01

    Healthcare's movement to value-based care is causing health systems across the country to consider whether owning or partnering with a health plan could benefit their organizations. Although organizations have different reasons for wanting to enter the insurance business, potential benefits include improving care quality, lowering costs, managing population health, expanding geographic reach, and diversifying the organization's revenue stream. However, the challenges and risks of owning a health plan are formidable: Assuming 100 percent financial risk for a patient population requires considerable financial resources, as well as competencies that are wholly different from those needed to run a hospital or physician group. For Spectrum Health, an integrated, not-for-profit health system based in Grand Rapids, Michigan, owning a health plan has been vital to fulfilling its mission of improving the health of the communities it serves, as well as its value proposition of providing highquality care at lower costs. This article weighs the pros and cons of operating a health plan; explores key business factors and required competencies that organizations need to consider when deciding whether to buy, build, or partner; examines the current environment for provider-sponsored health plans; and shares some of the lessons Spectrum Health has learned over three decades of running its health plan, Priority Health.

  14. Project Interface Requirements Process Including Shuttle Lessons Learned

    Science.gov (United States)

    Bauch, Garland T.

    2010-01-01

    Most failures occur at interfaces between organizations and hardware. Processing interface requirements at the start of a project life cycle will reduce the likelihood of costly interface changes/failures later. This can be done by adding Interface Control Documents (ICDs) to the Project top level drawing tree, providing technical direction to the Projects for interface requirements, and by funding the interface requirements function directly from the Project Manager's office. The interface requirements function within the Project Systems Engineering and Integration (SE&I) Office would work in-line with the project element design engineers early in the life cycle to enhance communications and negotiate technical issues between the elements. This function would work as the technical arm of the Project Manager to help ensure that the Project cost, schedule, and risk objectives can be met during the Life Cycle. Some ICD Lessons Learned during the Space Shuttle Program (SSP) Life Cycle will include the use of hardware interface photos in the ICD, progressive life cycle design certification by analysis, test, & operations experience, assigning interface design engineers to Element Interface (EI) and Project technical panels, and linking interface design drawings with project build drawings

  15. [Managing digital medical imaging projects in healthcare services: lessons learned].

    Science.gov (United States)

    Rojas de la Escalera, D

    2013-01-01

    Medical imaging is one of the most important diagnostic instruments in clinical practice. The technological development of digital medical imaging has enabled healthcare services to undertake large scale projects that require the participation and collaboration of many professionals of varied backgrounds and interests as well as substantial investments in infrastructures. Rather than focusing on systems for dealing with digital medical images, this article deals with the management of projects for implementing these systems, reviewing various organizational, technological, and human factors that are critical to ensure the success of these projects and to guarantee the compatibility and integration of digital medical imaging systems with other health information systems. To this end, the author relates several lessons learned from a review of the literature and the author's own experience in the technical coordination of digital medical imaging projects. Copyright © 2012 SERAM. Published by Elsevier Espana. All rights reserved.

  16. From resilience thinking to Resilience Planning: Lessons from practice.

    Science.gov (United States)

    Sellberg, M M; Ryan, P; Borgström, S T; Norström, A V; Peterson, G D

    2018-07-01

    Resilience thinking has frequently been proposed as an alternative to conventional natural resource management, but there are few studies of its applications in real-world settings. To address this gap, we synthesized experiences from practitioners that have applied a resilience thinking approach to strategic planning, called Resilience Planning, in regional natural resource management organizations in Australia. This case represents one of the most extensive and long-term applications of resilience thinking in the world today. We conducted semi-structured interviews with Resilience Planning practitioners from nine organizations and reviewed strategic planning documents to investigate: 1) the key contributions of the approach to their existing strategic planning, and 2) what enabled and hindered the practitioners in applying and embedding the new approach in their organizations. Our results reveal that Resilience Planning contributed to developing a social-ecological systems perspective, more adaptive and collaborative approaches to planning, and that it clarified management goals of desirable resource conditions. Applying Resilience Planning required translating resilience thinking to practice in each unique circumstance, while simultaneously creating support among staff, and engaging external actors. Embedding Resilience Planning within organizations implied starting and maintaining longer-term change processes that required sustained multi-level organizational support. We conclude by identifying four lessons for successfully applying and embedding resilience practice in an organization: 1) to connect internal "entrepreneurs" to "interpreters" and "networkers" who work across organizations, 2) to assess the opportunity context for resilience practice, 3) to ensure that resilience practice is a learning process that engages internal and external actors, and 4) to develop reflective strategies for managing complexity and uncertainty. Copyright © 2018 The Authors

  17. Quality Assurance Project Plan Development Tool

    Science.gov (United States)

    This tool contains information designed to assist in developing a Quality Assurance (QA) Project Plan that meets EPA requirements for projects that involve surface or groundwater monitoring and/or the collection and analysis of water samples.

  18. Fast flux test facility, transition project plan

    International Nuclear Information System (INIS)

    Guttenberg, S.

    1994-01-01

    The FFTF Transition Project Plan, Revision 1, provides changes and project baseline for the deactivation activities necessary to transition the FFTF to a radiologically and industrially safe shutdown condition

  19. Fast flux test facility, transition project plan

    Energy Technology Data Exchange (ETDEWEB)

    Guttenberg, S.

    1994-11-15

    The FFTF Transition Project Plan, Revision 1, provides changes and project baseline for the deactivation activities necessary to transition the FFTF to a radiologically and industrially safe shutdown condition.

  20. Understanding Applications of Project Planning and Scheduling in Construction Projects

    OpenAIRE

    AlNasseri, Hammad Abdullah

    2015-01-01

    Construction project life-cycle processes must be managed in a more effective and predictable way to meet project stakeholders’ needs. However, there is increasing concern about whether know-how effectively improves understanding of underlying theories of project management processes for construction organizations and their project managers. Project planning and scheduling are considered as key and challenging tools in controlling and monitoring project performance, but many worldwide constru...

  1. Seeking Comfort: How and Why Preservice Teachers Use Internet Resources for Lesson Planning

    Science.gov (United States)

    Sawyer, Amanda G.; Myers, Joy

    2018-01-01

    This study examined 158 lesson plans at one institution across two teacher education programs, inclusive early childhood and elementary education, to determine the impact of Internet usage as inspiration on preservice teachers' lesson plans. Fisher's exact test determined statistically significant differences between the Internet use of preservice…

  2. General Mechanical Repair. Minor Automotive Maintenance, Small Engine [Repair, and] Welding: Curriculum Guide and Lesson Plans.

    Science.gov (United States)

    Hamlin, Larry

    This document contains a curriculum guide and lesson plans for a general mechanical repair course with three sections: minor automotive maintenance, small engine repair, and welding. The curriculum guide begins with a matrix that relates the lesson plans to essential elements of math, science, language arts, and social studies and to Texas…

  3. Iranian EFL Teachers' Attitudes towards Lesson Planning Based on Their Gender

    Science.gov (United States)

    Heidari, Mina; Azizifar, Akbar; Gowhary, Habib; Abbasi, Zahra

    2015-01-01

    The purpose of this study was to examine Iranian EFL teachers' attitudes towards lesson plan based on their gender. The research is a quantitative study in which the data is obtained to get a great understanding on the relationship between lesson plan of Iranian English as Foreign Language (EFL) teachers and teachers' gender. The population…

  4. No Light at the End of Tunnel Vision: Steps for Improving Lesson Plans

    Science.gov (United States)

    Dunn, Rita; Craig, Martin; Favre, Lois; Markus, Doron; Pedota, Paul; Sookdeo, Gale; Stock, Jessica; Terry, Brian

    2010-01-01

    The authors of this article believe that the current structure of lesson plans impede differentiation, individualization, and innovation and offer little in assessing the quality of teaching and learning. Concrete steps will be offered for planning to better respond to student diversity in meeting lesson objectives. (Contains 1 figure.)

  5. The CHPRC Columbia River Protection Project Quality Assurance Project Plan

    Energy Technology Data Exchange (ETDEWEB)

    Fix, N. J.

    2008-11-30

    Pacific Northwest National Laboratory researchers are working on the CHPRC Columbia River Protection Project (hereafter referred to as the Columbia River Project). This is a follow-on project, funded by CH2M Hill Plateau Remediation Company, LLC (CHPRC), to the Fluor Hanford, Inc. Columbia River Protection Project. The work scope consists of a number of CHPRC funded, related projects that are managed under a master project (project number 55109). All contract releases associated with the Fluor Hanford Columbia River Project (Fluor Hanford, Inc. Contract 27647) and the CHPRC Columbia River Project (Contract 36402) will be collected under this master project. Each project within the master project is authorized by a CHPRC contract release that contains the project-specific statement of work. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the Columbia River Project staff.

  6. The CHPRC Columbia River Protection Project Quality Assurance Project Plan

    International Nuclear Information System (INIS)

    Fix, N.J.

    2008-01-01

    Pacific Northwest National Laboratory researchers are working on the CHPRC Columbia River Protection Project (hereafter referred to as the Columbia River Project). This is a follow-on project, funded by CH2M Hill Plateau Remediation Company, LLC (CHPRC), to the Fluor Hanford, Inc. Columbia River Protection Project. The work scope consists of a number of CHPRC funded, related projects that are managed under a master project (project number 55109). All contract releases associated with the Fluor Hanford Columbia River Project (Fluor Hanford, Inc. Contract 27647) and the CHPRC Columbia River Project (Contract 36402) will be collected under this master project. Each project within the master project is authorized by a CHPRC contract release that contains the project-specific statement of work. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the Columbia River Project staff

  7. A summary of lessons learned activities conducted at the OECD Halden Reactor Project

    International Nuclear Information System (INIS)

    Hallbert, B.P.

    1997-01-01

    A series of lessons learned studies have been conducted at the OECD Halden Reactor Project. The purpose of these lessons learned reports are to summarize knowledge and experience gained across a number of research project. This paper presents a summary of main issues addressed in four of these lessons learned projects. These are concerned with software development and quality assurance, software reliability, methods for test and evaluation of developed systems, and the evaluation of system design features

  8. Tools for Supporting Distributed Agile Project Planning

    Science.gov (United States)

    Wang, Xin; Maurer, Frank; Morgan, Robert; Oliveira, Josyleuda

    Agile project planning plays an important part in agile software development. In distributed settings, project planning is severely impacted by the lack of face-to-face communication and the inability to share paper index cards amongst all meeting participants. To address these issues, several distributed agile planning tools were developed. The tools vary in features, functions and running platforms. In this chapter, we first summarize the requirements for distributed agile planning. Then we give an overview on existing agile planning tools. We also evaluate existing tools based on tool requirements. Finally, we present some practical advices for both designers and users of distributed agile planning tools.

  9. RIVER PROTECTION PROJECT SYSTEM PLAN

    International Nuclear Information System (INIS)

    Certa, P.J.; Kirkbride, R.A.; Hohl, T.M.; Empey, P.A.; Wells, M.N.

    2009-01-01

    The U.S. Department of Energy (DOE), Office of River Protection (ORP) manages the River Protection Project (RPP). The RPP mission is to retrieve and treat Hanford's tank waste and close the tank farms to protect the Columbia River. As a result, ORP is responsible for the retrieval, treatment, and disposal of approximately 57 million gallons 1 of radioactive waste contained in the Hanford Site waste tanks and closure2 of all the tanks and associated facilities. The previous revision of the System Plan was issued in May 2008. ORP has made a number of changes to the tank waste treatment strategy and plans since the last revision of this document, and additional changes are under consideration. ORP has contracts in place to implement the strategy for completion of the mission and establish the capability to complete the overall mission. The current strategl involves a number of interrelated activities. ORP will reduce risk to the environment posed by tank wastes by the following: (1) Retrieving the waste from the single-shell tanks (SST) to double-shell tanks (DST) and delivering the waste to the Waste Treatment and Immobilization Plant (WTP). (2) Constructing and operating the WTP, which will safely treat all of the high-level waste (HLW) fraction contained in the tank farms. About one-third of the low-activity waste (LAW) fraction separated from the HLW fraction in the WTP will be immobilized in the WTP LAW Vitrification Facility. (3) Developing and deploying supplemental treatment capability assumed to be a second LAW vitrification facility that can safely treat about two-thirds of the LAW contained in the tank farms. (4) Developing and deploying supplemental pretreatment capability currently assumed to be an Aluminum Removal Facility (ARF) using a lithium hydrotalcite process to mitigate sodium management issues. (5) Developing and deploying treatment and packaging capability for contact-handled transuranic (CH-TRU) tank waste for possible shipment to and disposal

  10. RIVER PROTECTION PROJECT SYSTEM PLAN

    Energy Technology Data Exchange (ETDEWEB)

    CERTA PJ; KIRKBRIDE RA; HOHL TM; EMPEY PA; WELLS MN

    2009-09-15

    The U.S. Department of Energy (DOE), Office of River Protection (ORP) manages the River Protection Project (RPP). The RPP mission is to retrieve and treat Hanford's tank waste and close the tank farms to protect the Columbia River. As a result, ORP is responsible for the retrieval, treatment, and disposal of approximately 57 million gallons 1 of radioactive waste contained in the Hanford Site waste tanks and closure2 of all the tanks and associated facilities. The previous revision of the System Plan was issued in May 2008. ORP has made a number of changes to the tank waste treatment strategy and plans since the last revision of this document, and additional changes are under consideration. ORP has contracts in place to implement the strategy for completion of the mission and establish the capability to complete the overall mission. The current strategl involves a number of interrelated activities. ORP will reduce risk to the environment posed by tank wastes by the following: (1) Retrieving the waste from the single-shell tanks (SST) to double-shell tanks (DST) and delivering the waste to the Waste Treatment and Immobilization Plant (WTP). (2) Constructing and operating the WTP, which will safely treat all of the high-level waste (HLW) fraction contained in the tank farms. About one-third of the low-activity waste (LAW) fraction separated from the HLW fraction in the WTP will be immobilized in the WTP LAW Vitrification Facility. (3) Developing and deploying supplemental treatment capability assumed to be a second LAW vitrification facility that can safely treat about two-thirds of the LAW contained in the tank farms. (4) Developing and deploying supplemental pretreatment capability currently assumed to be an Aluminum Removal Facility (ARF) using a lithium hydrotalcite process to mitigate sodium management issues. (5) Developing and deploying treatment and packaging capability for contact-handled transuranic (CH-TRU) tank waste for possible shipment to and

  11. Quality Assurance Project Plan for Facility Effluent Monitoring Plan activities

    International Nuclear Information System (INIS)

    Nickels, J.M.

    1991-06-01

    This Quality Assurance Project Plan addresses the quality assurance requirements for the Facility Monitoring Plans of the overall site-wide environmental monitoring plan. This plan specifically applies to the sampling and analysis activities and continuous monitoring performed for all Facility Effluent Monitoring Plan activities conducted by Westinghouse Hanford Company. It is generic in approach and will be implemented in conjunction with the specific requirements of individual Facility Effluent Monitoring Plans. This document is intended to be a basic road map to the Facility Effluent Monitoring Plan documents (i.e., the guidance document for preparing Facility Effluent Monitoring Plans, Facility Effluent Monitoring Plan determinations, management plan, and Facility Effluent Monitoring Plans). The implementing procedures, plans, and instructions are appropriate for the control of effluent monitoring plans requiring compliance with US Department of Energy, US Environmental Protection Agency, state, and local requirements. This Quality Assurance Project Plan contains a matrix of organizational responsibilities, procedural resources from facility or site manuals used in the Facility Effluent Monitoring Plans, and a list of the analytes of interest and analytical methods for each facility preparing a Facility Effluent Monitoring Plan. 44 refs., 1 figs., 2 tabs

  12. Uranium Mill Tailings Remedial Action Project surface project management plan

    International Nuclear Information System (INIS)

    1994-09-01

    This Project Management Plan describes the planning, systems, and organization that shall be used to manage the Uranium Mill Tailings Remedial Action Project (UMTRA). US DOE is authorized to stabilize and control surface tailings and ground water contamination at 24 inactive uranium processing sites and associated vicinity properties containing uranium mill tailings and related residual radioactive materials

  13. RIVER PROTECTION PROJECT SYSTEM PLAN

    Energy Technology Data Exchange (ETDEWEB)

    CERTA PJ

    2008-07-10

    The U.S. Department of Energy (DOE), Office of River Protection (ORP) manages the River Protection Project (RPP). The RPP mission is to retrieve and treat Hanford's tank waste and close the tank farms to protect the Columbia River. As a result, the ORP is responsible for the retrieval, treatment, and disposal of the approximately 57 million gallons of radioactive waste contained in the Hanford Site waste tanks and closure of all the tanks and associated facilities. The previous revision of the System Plan was issued in September 2003. ORP has approved a number of changes to the tank waste treatment strategy and plans since the last revision of this document, and additional changes are under consideration. The ORP has established contracts to implement this strategy to establish a basic capability to complete the overall mission. The current strategy for completion of the mission uses a number of interrelated activities. The ORP will reduce risk to the environment posed by tank wastes by: (1) Retrieving the waste from the single-shell tanks (SST) to double-shell tanks (DST) for treatment and disposal; (2) Constructing and operating the WTP, which will safely treat all of the high-level waste (HLW) and about half of the low-activity waste (LAW) contained in the tank farms, and maximizing its capability and capacity; (3) Developing and deploying supplemental treatment capability or a second WTP LAW Facility that can safely treat about half of the LAW contained in the tank farms; (4) Developing and deploying treatment and packaging capability for transuranic (TRU) tank waste for shipment to and disposal at the Waste Isolation Pilot Plant (WIPP); (5) Deploying interim storage capacity for the immobilized HLW and shipping that waste to Yucca Mountain for disposal; (6) Operating the Integrated Disposal Facility for the disposal of immobilized LAW, along with the associated secondary waste, (7) Closing the SST and DST tank farms, ancillary facilities, and al1 waste

  14. RIVER PROTECTION PROJECT SYSTEM PLAN

    International Nuclear Information System (INIS)

    CERTA PJ

    2008-01-01

    The U.S. Department of Energy (DOE), Office of River Protection (ORP) manages the River Protection Project (RPP). The RPP mission is to retrieve and treat Hanford's tank waste and close the tank farms to protect the Columbia River. As a result, the ORP is responsible for the retrieval, treatment, and disposal of the approximately 57 million gallons of radioactive waste contained in the Hanford Site waste tanks and closure of all the tanks and associated facilities. The previous revision of the System Plan was issued in September 2003. ORP has approved a number of changes to the tank waste treatment strategy and plans since the last revision of this document, and additional changes are under consideration. The ORP has established contracts to implement this strategy to establish a basic capability to complete the overall mission. The current strategy for completion of the mission uses a number of interrelated activities. The ORP will reduce risk to the environment posed by tank wastes by: (1) Retrieving the waste from the single-shell tanks (SST) to double-shell tanks (DST) for treatment and disposal; (2) Constructing and operating the WTP, which will safely treat all of the high-level waste (HLW) and about half of the low-activity waste (LAW) contained in the tank farms, and maximizing its capability and capacity; (3) Developing and deploying supplemental treatment capability or a second WTP LAW Facility that can safely treat about half of the LAW contained in the tank farms; (4) Developing and deploying treatment and packaging capability for transuranic (TRU) tank waste for shipment to and disposal at the Waste Isolation Pilot Plant (WIPP); (5) Deploying interim storage capacity for the immobilized HLW and shipping that waste to Yucca Mountain for disposal; (6) Operating the Integrated Disposal Facility for the disposal of immobilized LAW, along with the associated secondary waste, (7) Closing the SST and DST tank farms, ancillary facilities, and al1 waste

  15. Interrogating the Lesson Plan in a Pre-Service Methods Course: Evidence from a University in Kenya

    Science.gov (United States)

    Simwa, Kefa L.; Modiba, Maropeng

    2015-01-01

    The paper reports on research that examined how the content of a History methods course, taught in a university in Kenya, influenced student teachers' lesson planning and pedagogical skills. A lecture on a lesson plan, micro-teaching lesson plan documents and presentations were examined to determine student teachers' preparedness for teaching the…

  16. Optimization education after project implementation: sharing "lessons learned" with staff.

    Science.gov (United States)

    Vaughn, Susan

    2011-01-01

    Implementations involving healthcare technology solutions focus on providing end-user education prior to the application going "live" in the organization. Benefits to postimplementation education for staff should be included when planning these projects. This author describes the traditional training provided during the implementation of a bar-coding medication project and then the optimization training 8 weeks later.

  17. Licensing plan for UMTRA project disposal sites

    International Nuclear Information System (INIS)

    1993-09-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Office developed a plan to define UMTRA Project licensing program objectives and establish a process enabling the DOE to document completion of remedial actions in compliance with 40 CFR 1 92 and the requirements of the NRC general license. This document supersedes the January 1987 Project Licensing Plan (DOE, 1987). The plan summarizes the legislative and regulatory basis for licensing, identifies participating agencies and their roles and responsibilities, defines key activities and milestones in the licensing process, and details the coordination of these activities. This plan provides an overview of the UMTRA Project from the end of remedial actions through the NRC's acceptance of a disposal site under the general license. The licensing process integrates large phases of the UMTRA Project. Other programmatic UMTRA Project documents listed in Section 6.0 provide supporting information

  18. What Are the Effects of Science Lesson Planning in Peers?—Analysis of Attitudes and Knowledge Based on an Actor-Partner Interdependence Model

    Science.gov (United States)

    Smit, Robbert; Rietz, Florian; Kreis, Annelies

    2018-06-01

    This study focuses on the effects of collaborative lesson planning by science pre-service teachers on their attitudes and knowledge. In our study, 120 pre-service teachers discussed a preparation for a science inquiry lesson in dyads. The teacher with the lesson preparation had the role of the coachee, while the other was the coach. We investigated the following research questions: (1) Does learning occur between the two peers? and (2) Is the competency in lesson planning affected by the attitude and knowledge of coach and coachee? Based on an actor-partner interdependence model (APIM), we could clarify the relations of pedagogical content knowledge (PCK) and attitudes (ATT) between and within the dyads of coach and coachee, as well as their development over time. Furthermore, the APIM allowed the inclusion of a mediator (lesson planning competency). Both PCK and ATT increased slightly but significantly during our project. ATT and PCK seemed to converge between coach and coachee at the end of the project. However, we could not find any cross-lagged effects, meaning there was no effect of coach on coachee or vice versa over time. Further, preceding PCK showed a significant effect on the competency of lesson planning, but planning competency did not influence succeeding PCK or attitude. Finally, these results are discussed with respect to science teacher education.

  19. What Are the Effects of Science Lesson Planning in Peers?—Analysis of Attitudes and Knowledge Based on an Actor-Partner Interdependence Model

    Science.gov (United States)

    Smit, Robbert; Rietz, Florian; Kreis, Annelies

    2017-04-01

    This study focuses on the effects of collaborative lesson planning by science pre-service teachers on their attitudes and knowledge. In our study, 120 pre-service teachers discussed a preparation for a science inquiry lesson in dyads. The teacher with the lesson preparation had the role of the coachee, while the other was the coach. We investigated the following research questions: (1) Does learning occur between the two peers? and (2) Is the competency in lesson planning affected by the attitude and knowledge of coach and coachee? Based on an actor-partner interdependence model (APIM), we could clarify the relations of pedagogical content knowledge (PCK) and attitudes (ATT) between and within the dyads of coach and coachee, as well as their development over time. Furthermore, the APIM allowed the inclusion of a mediator (lesson planning competency). Both PCK and ATT increased slightly but significantly during our project. ATT and PCK seemed to converge between coach and coachee at the end of the project. However, we could not find any cross-lagged effects, meaning there was no effect of coach on coachee or vice versa over time. Further, preceding PCK showed a significant effect on the competency of lesson planning, but planning competency did not influence succeeding PCK or attitude. Finally, these results are discussed with respect to science teacher education.

  20. UMTRA Project: Environment, Safety, and Health Plan

    International Nuclear Information System (INIS)

    1995-02-01

    The US Department of Energy has prepared this UMTRA Project Environment, Safety, and Health (ES and H) Plan to establish the policy, implementing requirements, and guidance for the UMTRA Project. The requirements and guidance identified in this plan are designed to provide technical direction to UMTRA Project contractors to assist in the development and implementation of their ES and H plans and programs for UMTRA Project work activities. Specific requirements set forth in this UMTRA Project ES and H Plan are intended to provide uniformity to the UMTRA Project's ES and H programs for processing sites, disposal sites, and vicinity properties. In all cases, this UMTRA Project ES and H Plan is intended to be consistent with applicable standards and regulations and to provide guidance that is generic in nature and will allow for contractors' evaluation of site or contract-specific ES and H conditions. This plan specifies the basic ES and H requirements applicable to UMTRA Project ES and H programs and delineates responsibilities for carrying out this plan. DOE and contractor ES and H personnel are expected to exercise professional judgment and apply a graded approach when interpreting these guidelines, based on the risk of operations

  1. Graduate Student Project: Operations Management Product Plan

    Science.gov (United States)

    Fish, Lynn

    2007-01-01

    An operations management product project is an effective instructional technique that fills a void in current operations management literature in product planning. More than 94.1% of 286 graduates favored the project as a learning tool, and results demonstrate the significant impact the project had in predicting student performance. The author…

  2. 233S Decommissioning Project Environmental Control Plan

    International Nuclear Information System (INIS)

    Zoric, J.P.

    2000-01-01

    This Environmental Control Plan is for the 233S Decommissioning activities conducted under the removal action report for the 233S Decontamination and Demolition Project. The purpose of this ECP is to identify environmental requirements for the 233S project. The ECP is a compilation of existing environmental permit conditions, regulatory requirements, and environmental requirements applicable to the specific project or functional activity

  3. The impact of curricula and lesson planning in the teaching process

    OpenAIRE

    Majlinda Lika

    2017-01-01

    Lesson planning is at the core of teaching. It allows teachers to create an orientation path in the process of teaching, taking into consideration, many elements such as, students’ styles of learning, previous knowledge, types of intelligences, interests etc. Effective curricula plans are characterized by principles of coherence, flexibility, integration of knowledge etc. Effective lesson plans strongly rely on previous information gathered through different forms of assessment, and provide i...

  4. Project Management Plan for Material Stabilization

    International Nuclear Information System (INIS)

    SPEER, D.R.

    1999-01-01

    This plan presents the overall objectives, description, justification and planning for the plutonium Finishing Plant (PFP) Materials Stabilization project. The intent of this plan is to describe how this project will be managed and integrated with other facility stabilization and deactivation activities. This plan supplements the overall integrated plan presented in the Plutonium Finishing Plant Integrated Project Management Plan (IPMP), HNF-3617/Rev. 0. This is the top-level definitive project management document that specifies the technical (work scope), schedule, and cost baselines to manager the execution of this project. It describes the organizational approach and roles/responsibilities to be implemented to execute the project. This plan is under configuration management and any deviations must be authorized by appropriate change control action. Materials stabilization is designated the responsibility to open and stabilize containers of plutonium metal, oxides, alloys, compounds, and sources. Each of these items is at least 30 weight percent plutonium/uranium. The output of this project will be containers of materials in a safe and stable form suitable for storage pending final packaging and/or transportation offsite. The corrosion products along with oxides and compounds will be stabilized via muffle furnaces to reduce the materials to high fired oxides

  5. Policy and planning for large infrastructure projects

    DEFF Research Database (Denmark)

    Flyvbjerg, Bent

    2005-01-01

    This paper focuses on problems and their causes and cures in policy and planning for large infrastructure projects. First, it identifies as the main problem in major infrastructure development pervasive misinformation about the costs, benefits, and risks involved. A consequence of misinformation ...... for large infrastructure projects, with a focus on better planning methods and changed governance structures, the latter being more important.......This paper focuses on problems and their causes and cures in policy and planning for large infrastructure projects. First, it identifies as the main problem in major infrastructure development pervasive misinformation about the costs, benefits, and risks involved. A consequence of misinformation...... the likelihood that it is their projects, and not the competition's, that gain approval and funding. This results in the "survival of the unfittest," where often it is not the best projects that are built, but the most misrepresented ones. Finally, the paper presents measures for reforming policy and planning...

  6. A Text Mining Approach for Extracting Lessons Learned from Project Documentation: An Illustrative Case Study

    Directory of Open Access Journals (Sweden)

    Benjamin Matthies

    2017-12-01

    Full Text Available Lessons learned are important building blocks for continuous learning in project-based organisations. Nonetheless, the practical reality is that lessons learned are often not consistently reused for organisational learning. Two problems are commonly described in this context: the information overload and the lack of procedures and methods for the assessment and implementation of lessons learned. This paper addresses these problems, and appropriate solutions are combined in a systematic lesson learned process. Latent Dirichlet Allocation is presented to solve the first problem. Regarding the second problem, established risk management methods are adapted. The entire lessons learned process will be demonstrated in a practical case study

  7. Anticipating students' reasoning and planning prompts in structured problem-solving lessons

    Science.gov (United States)

    Vale, Colleen; Widjaja, Wanty; Doig, Brian; Groves, Susie

    2018-02-01

    Structured problem-solving lessons are used to explore mathematical concepts such as pattern and relationships in early algebra, and regularly used in Japanese Lesson Study research lessons. However, enactment of structured problem-solving lessons which involves detailed planning, anticipation of student solutions and orchestration of whole-class discussion of solutions is an ongoing challenge for many teachers. Moreover, primary teachers have limited experience in teaching early algebra or mathematical reasoning actions such as generalising. In this study, the critical factors of enacting the structured problem-solving lessons used in Japanese Lesson Study to elicit and develop primary students' capacity to generalise are explored. Teachers from three primary schools participated in two Japanese Lesson Study teams for this study. The lesson plans and video recordings of teaching and post-lesson discussion of the two research lessons along with students' responses and learning are compared to identify critical factors. The anticipation of students' reasoning together with preparation of supporting and challenging prompts was critical for scaffolding students' capacity to grasp and communicate generality.

  8. UMTRA Project value engineering plan

    International Nuclear Information System (INIS)

    1990-06-01

    The objective of value engineering (VE) on the Uranium MILL Tailings Remedial Action (UMTRA) Project is to ensure that remedial action at the UMTRA Project sites is performed to meet the US Environmental Protection Agency (EPA) standards for inactive uranium mill tailings sites at the lowest cost, while maintaining a high quality of work. Through review of designs and consideration of reasonable, less expensive alternatives, VE can be an effective cost reduction tool and a means to improve the design. The UMTRA Project products are the design and construction of stabilized tailings embankments

  9. Spatial policy, planning and infrastructure investment: Lessons from ...

    African Journals Online (AJOL)

    Dr Louis J. Waldeck, Manager, Urban Dynamics Laboratory, CSIR Built ... funded Integrated Planning and Development Modelling (IPDM) project, the article ... areas ought to be grounded in robust and rigorous analysis and scenario evaluation. ... Partnership Infrastructure Grants ... in water supply and regional bulk.

  10. SNF project engineering process improvement plan

    International Nuclear Information System (INIS)

    KELMENSON, R.L.

    1999-01-01

    This Engineering Process Improvement Plan documents the activities and plans to be taken by the SNF Project (the Project) to support its engineering process and to produce a consolidated set of engineering procedures that are fully compliant with the requirements of HNF-PRO-1819 (1819). These requirements are imposed on all engineering activities performed for the Project and apply to all life-cycle stages of the Project's systems, structures and components (SSCs). This Plan describes the steps that will be taken by the Project during the transition period to ensure that new procedures are effectively integrated into the Project's work process as these procedures are issued. The consolidated procedures will be issued and implemented by September 30, 1999

  11. A sample lesson plan for the course English Composition II

    Directory of Open Access Journals (Sweden)

    Córdoba Cubillo, Patricia

    2005-03-01

    Full Text Available The goal of this article is to present a lesson plan and a series of sample tasks to help the instructors from the course English Composition II, at the School of Modern Languages from the University of Costa Rica, to guide students write an essay integrating the four skills: listening, speaking, reading, and writing. These activities will be a source of comprehensible input for the learners that will hopefully result in a good writing piece. El objetivo de este artículo es presentar un plan de lección y una serie de actividades que le ayudarán a los y las instructoras del curso Composición Inglesa II de la Escuela de Lenguas Modernas de la Universidad de Costa Rica a guiar a sus estudiantes a escribir un ensayo integrando las cuatro macro-destrezas, a saber comprensión auditiva, conversación, lectura y escritura. Mediante estas actividades se espera que los estudiantes elaboren un ensayo de calidad.

  12. Conceptual Design Plan SM-43 Replacement Project

    Energy Technology Data Exchange (ETDEWEB)

    University of California, Los Alamos National Laboratory, SCC Project Office

    2000-11-01

    The Los Alamos National Laboratory Conceptual Design Plan for the SM-43 Replacement Project outlines plans for replacing the SM-43 Administration Building. Topics include the reasons that replacement is considered a necessity; the roles of the various project sponsors; and descriptions of the proposed site and facilities. Also covered in this proposal is preliminary information on the project schedule, cost estimates, acquisition strategy, risk assessment, NEPA strategy, safety strategy, and safeguards and security. Spreadsheets provide further detail on space requirements, project schedules, and cost estimates.

  13. Pollution prevention program for new projects -- Lessons learned

    Energy Technology Data Exchange (ETDEWEB)

    Lum, J. [Dept. of Energy, Washington, DC (United States)

    1993-03-01

    The purpose of this presentation is to relay the experience of the Office of New Production Reactors (NP) in developing and implementing its pollution prevention program. NP was established to plan, design, and construct a new safe and environmentally acceptable nuclear reactor capacity necessary to provide an assured supply of tritium to maintain the nation`s long-term deterrent capability. The Program offered the Department of Energy an opportunity to demonstrate its commitment to environmental protection via minimization of environmental releases; new design offers the best opportunity for pollution prevention. The NP pollution prevention program was never fully implemented because NP`s tritium production design activity was recovery terminated. The information in this paper represented lessons learned from the last three years of NP operation.

  14. The Media and Controlled Substances; Anti-Drug Legislation. Lesson Plans.

    Science.gov (United States)

    Laverdure, Sharon

    1991-01-01

    Provides two lesson plans for classroom use. Focuses on media influence on the use of alcohol and tobacco and on regulatory laws and their effect on drug use. Identifies connections that can be made to textbooks and magazine articles, as well as suggestions for opening, developing, and concluding each lesson. (DK)

  15. Tobacco Use Prevention Education. K-12 Lesson Plans from the Montana Model Curriculum for Health Enhancement.

    Science.gov (United States)

    Montana State Office of Public Instruction, Helena.

    This publication presents K-12 tobacco use prevention lesson plans for schools in the state of Montana. Lessons for students in grades K-6 include: family connections; body tracing; smokeless tobacco; prenatal development; tobacco look-alikes; tobacco chemicals; analyzing tobacco and alcohol ads; tobacco use and the lungs; and a personal health…

  16. The impact of curricula and lesson planning in the teaching process

    Directory of Open Access Journals (Sweden)

    Majlinda Lika

    2017-03-01

    Full Text Available Lesson planning is at the core of teaching. It allows teachers to create an orientation path in the process of teaching, taking into consideration, many elements such as, students’ styles of learning, previous knowledge, types of intelligences, interests etc. Effective curricula plans are characterized by principles of coherence, flexibility, integration of knowledge etc. Effective lesson plans strongly rely on previous information gathered through different forms of assessment, and provide inclusive opportunities for every student. This paper will show how planning affects teaching and the quality of learning. First, a review of the literature will represent the importance of flexible planning and incorporation of differentiated elements of planning that ensure inclusive opportunities of learning for all students. Second, there will be a detailed analysis of findings taken by 25 full school inspections practices on the field of “lesson planning”. This part of the study will specify the planning difficulties the teachers face and how this affects the process of teaching and learning. Third, benefits of lesson plans that rely on good assessment practices and integrate differentiated instruction according to students' needs will be discussed as ways of helping teachers adjust lesson plans to overcome their planning difficulties. Findings indicate that teachers design lesson plans that do not rely on good assessment practices. Lesson plans are not flexible enough to respond and satisfy the needs of all categories of students, impacting that way the quality of instruction and learning. The paper will serve teachers to review their planning approaches and integrate elements of differentiated instruction as an organic part of the process, responding to traits and uniqueness students represent.

  17. Criticality Safety Lessons Learned in a Deactivation and Decommissioning Environment [A Guide for Facility and Project Managers

    Energy Technology Data Exchange (ETDEWEB)

    Nirider, L. Tom

    2003-08-06

    This document was designed as a reference and a primer for facility and project managers responsible for Deactivation and Decommissioning (D&D) processes in facilities containing significant inventories of fissionable materials. The document contains lessons learned and guidance for the development and management of criticality safety programs. It also contains information gleaned from occurrence reports, assessment reports, facility operations and management, NDA program reviews, criticality safety experts, and criticality safety evaluations. This information is designed to assist in the planning process and operational activities. Sufficient details are provided to allow the reader to understand the events, the lessons learned, and how to apply the information to present or planned D&D processes. Information is also provided on general lessons learned including criticality safety evaluations and criticality safety program requirements during D&D activities. The document also explores recent and past criticality accidents in operating facilities, and it extracts lessons learned pertinent to D&D activities. A reference section is included to provide additional information. This document does not address D&D lessons learned that are not pertinent to criticality safety.

  18. Criticality Safety Lessons Learned in a Deactivation and Decommissioning Environment [A Guide for Facility and Project Managers

    International Nuclear Information System (INIS)

    NIRIDER, L.T.

    2003-01-01

    This document was designed as a reference and a primer for facility and project managers responsible for Deactivation and Decommissioning (D and D) processes in facilities containing significant inventories of fissionable materials. The document contains lessons learned and guidance for the development and management of criticality safety programs. It also contains information gleaned from occurrence reports, assessment reports, facility operations and management, NDA program reviews, criticality safety experts, and criticality safety evaluations. This information is designed to assist in the planning process and operational activities. Sufficient details are provided to allow the reader to understand the events, the lessons learned, and how to apply the information to present or planned D and D processes. Information is also provided on general lessons learned including criticality safety evaluations and criticality safety program requirements during D and D activities. The document also explores recent and past criticality accidents in operating facilities, and it extracts lessons learned pertinent to D and D activities. A reference section is included to provide additional information. This document does not address D and D lessons learned that are not pertinent to criticality safety

  19. The Fermilab ISDN Pilot Project: Experiences and future plans

    Energy Technology Data Exchange (ETDEWEB)

    Martin, D.E.; Lego, A.J.; Clifford, A.E.

    1995-12-31

    Fully operational in June of 1994, the Fermilab ISDN Pilot Project was started to gain insight into the costs and benefits of providing ISDN service to the homes of Fermilab researchers. Fourteen users were chosen from throughout Fermilab, but the number of Fermilab-employed spouses pushed the total user count to 20. Each home was equipped with a basic rate ISDN (BRI) line, a BRI Ethernet half-bridge, and an NT-1. An inter-departmental team coordinated the project. Usage at each home was tracked and frequent surveys were attempted. Lessons learned include: working with Ameritech can be difficult; careful monitoring is essential; and configuration of home computing equipment is very time consuming. Plans include moving entirely to primary rate ISDN hubs, support for different home ISDN equipment and better usage and performance tracking.

  20. The Fermilab ISDN Pilot Project: Experiences and future plans

    International Nuclear Information System (INIS)

    Martin, D.E.; Lego, A.J.; Clifford, A.E.

    1995-01-01

    Fully operational in June of 1994, the Fermilab ISDN Pilot Project was started to gain insight into the costs and benefits of providing ISDN service to the homes of Fermilab researchers. Fourteen users were chosen from throughout Fermilab, but the number of Fermilab-employed spouses pushed the total user count to 20. Each home was equipped with a basic rate ISDN (BRI) line, a BRI Ethernet half-bridge, and an NT-1. An inter-departmental team coordinated the project. Usage at each home was tracked and frequent surveys were attempted. Lessons learned include: working with Ameritech can be difficult; careful monitoring is essential; and configuration of home computing equipment is very time consuming. Plans include moving entirely to primary rate ISDN hubs, support for different home ISDN equipment and better usage and performance tracking

  1. The Fermilab ISDN pilot project: experiences and future plans

    International Nuclear Information System (INIS)

    Martin, D.E.; Lego, A.J.; Clifford, A.E.

    1996-01-01

    Fully operational in June of 1994, the Fermilab ISDN Pilot Project was started to gain insight into the costs and benefits of providing ISDN service to the homes of Fermilab researchers. Fourteen were chosen from throughout Fermilab, but the number of Fermilab-employed spouses pushed the total user count to 20. each home was equipped with a basic rate ISDN (BRI) Ethernet half-bridge, and an NT-1. An inter-departmental team coordinated the project. Usage at each home was tracked and frequent surveys were attempted. Lessons learned include: working with Ameritech can be difficult; careful monitoring is essential; and configuration of home computing equipment is very time consuming. Plans include moving entirely to primary rate ISDN hubs, support for different home ISDN equipment and better usage and performance tracking. (author)

  2. Life sciences space biology project planning

    Science.gov (United States)

    Primeaux, G.; Newkirk, K.; Miller, L.; Lewis, G.; Michaud, R.

    1988-01-01

    The Life Sciences Space Biology (LSSB) research will explore the effect of microgravity on humans, including the physiological, clinical, and sociological implications of space flight and the readaptations upon return to earth. Physiological anomalies from past U.S. space flights will be used in planning the LSSB project.The planning effort integrates science and engineering. Other goals of the LSSB project include the provision of macroscopic view of the earth's biosphere, and the development of spinoff technology for application on earth.

  3. SNF project engineering process improvement plan

    International Nuclear Information System (INIS)

    DESAI, S.P.

    1999-01-01

    This Engineering Process Improvement Plan documents the activities and plans to be taken by the SNF Project to support its engineering process and to produce a consolidated set of engineering procedures that are fully compliant with the requirements of HNF-PRO-1819. All new procedures will be issued and implemented by September 30, 1999

  4. K-12 Phenology Lessons for the Phenocam Project

    Science.gov (United States)

    Bennett, K. F.

    2013-12-01

    Phenology is defined as periodic [or annual] life cycles of plants and animals driven by seasonal environmental changes. Climate change impinges a strong effect on phenology, potentially altering the structure and functioning of ecosystems. In the fall of 2011, the Ashburnham-Westminster Regional School District became the first of five schools to join Harvard University's Phenocam Network with the installation of a webcam to monitor phenology (or 'phenocam') at Overlook Middle School in Ashburnham, Massachusetts. Our school district is now part of a network of near-surface remote sensing phenocams that capture and send images of forest, shrub, and grassland vegetation cover at more than 130 diverse sites in North America. Our phenocam provides a digital image every half hour of the mixed forest canopy north from the school, enabling the detection of changes in canopy development, quantified as canopy 'greenness'. As a part of the Phenocam project, students at the K-12 level have expanded the scope of phenological monitoring protocol that is part of the Harvard Forest Schoolyard Ecology Program, Buds, Leaves, and Global Warming. In this protocol, students work with ecologists at Harvard Forest to monitor buds and leaves on schoolyard trees to determine the length of the growing season, giving them the opportunity to be a part of real and important research concerning the critical environmental issue of climate change. Students involved in the Buds, Leaves, and Global Warming study have the opportunity to compare their ground data on budburst, color change, and leaf drop to the phenocam images, as well as to similar forested sites in locations throughout the United States. Lessons have been developed for comparing student data to phenocam images, canopy greenness time series graphs extracted from the images, and satellite data. Lessons addressing map scale and the Urban Heat Island effect will also be available for teachers. This project will greatly enhance the

  5. SOCAP: Lessons learned in applying SIPE-2 to the military operations crisis action planning domain

    Science.gov (United States)

    Desimone, Roberto

    1992-01-01

    This report describes work funded under the DARPA Planning and Scheduling Initiative that led to the development of SOCAP (System for Operations Crisis Action Planning). In particular, it describes lessons learned in applying SIPE-2, the underlying AI planning technology within SOCAP, to the domain of military operations deliberate and crisis action planning. SOCAP was demonstrated at the U.S. Central Command and at the Pentagon in early 1992. A more detailed report about the lessons learned is currently being prepared. This report was presented during one of the panel discussions on 'The Relevance of Scheduling to AI Planning Systems.'

  6. Geocuration Lessons Learned from the Climate Data Initiative Project

    Science.gov (United States)

    Ramachandran, Rahul; Bugbee, Kaylin; Tilmes, Curt; Pinheiro Privette, Ana

    2015-01-01

    Curation is traditionally defined as the process of collecting and organizing information around a common subject matter or a topic of interest and typically occurs in museums, art galleries, and libraries. The task of organizing data around specific topics or themes is a vibrant and growing effort in the biological sciences but to date this effort has not been actively pursued in the Earth sciences. This presentation will introduce the concept of geocuration, which we define it as the act of searching, selecting, and synthesizing Earth science data/metadata and information from across disciplines and repositories into a single, cohesive, and useful compendium. We also present the Climate Data Initiative (CDI) project as an prototypical example. The CDI project is a systematic effort to manually curate and share openly available climate data from various federal agencies. CDI is a broad multi-agency effort of the U.S. government and seeks to leverage the extensive existing federal climate-relevant data to stimulate innovation and private-sector entrepreneurship to support national climate change preparedness. The geocuration process used in the CDI project, key lessons learned, and suggestions to improve similar geocuration efforts in the future will be part of this presentation.

  7. Geocuration Lessons Learned from the Climate Data Initiative Project

    Science.gov (United States)

    Ramachandran, R.; Bugbee, K.; Tilmes, C.; Privette, A. P.

    2015-12-01

    Curation is traditionally defined as the process of collecting and organizing information around a common subject matter or a topic of interest and typically occurs in museums, art galleries, and libraries. The task of organizing data around specific topics or themes is a vibrant and growing effort in the biological sciences but to date this effort has not been actively pursued in the Earth sciences. This presentation will introduce the concept of geocuration, which we define it as the act of searching, selecting, and synthesizing Earth science data/metadata and information from across disciplines and repositories into a single, cohesive, and useful compendium.We also present the Climate Data Initiative (CDI) project as an exemplar example. The CDI project is a systematic effort to manually curate and share openly available climate data from various federal agencies. CDI is a broad multi-agency effort of the U.S. government and seeks to leverage the extensive existing federal climate-relevant data to stimulate innovation and private-sector entrepreneurship to support national climate-change preparedness. The geocuration process used in CDI project, key lessons learned, and suggestions to improve similar geocuration efforts in the future will be part of this presentation.

  8. Integrating gender into natural resources management projects: USAID lessons learned.

    Science.gov (United States)

    1998-01-01

    This article discusses USAID's lessons learned about integrating gender into natural resource management (NRM) projects in Peru, the Philippines, and Kenya. In Peru, USAID integrated women into a solid waste management project by lending money to invest in trash collection supplies. The loans allowed women to collect household waste, transfer it to a landfill, and provide additional sanitary disposal. The women were paid through direct fees from households and through service contracts with municipalities. In Mindanao, the Philippines, women were taught about the health impact of clean water and how to monitor water quality, including the monitoring of E. coli bacteria. Both men and women were taught soil conservation techniques for reducing the amount of silt running into the lake, which interferes with the generation of electricity and affects the health of everyone. The education helped women realize the importance of reducing silt and capitalized on their interest in protecting the health of their families. The women were thus willing to monitor the lake's water quality to determine if the conservation efforts were effective. In Kenya, USAID evaluated its Ecology, Community Organization, and Gender project in the Rift Valley, which helped resettle a landless community and helped with sustainable NRM. The evaluation revealed that women's relative bargaining power was less than men's. Organized capacity building that strengthened women's networks and improved their capacity to push issues onto the community agenda assured women a voice in setting the local NRM agenda.

  9. United States Support Programme (USSP): Lessons Learned from the Management of Complex, Multi-Stakeholder Projects for International Safeguards

    International Nuclear Information System (INIS)

    Diaz, R.; Tackentien, J.

    2015-01-01

    This paper will review USSP experiences, lessons learned, and proposed future strategies on the management of complex projects including the Universal Non-Destructive Assay Data Acquisition Platform (UNAP) instrument development task. The focus will be on identifying lessons learned to formulate strategies to minimize risk and maximize the potential of commercial success for future complex projects. Topics planned for inclusion are: 1. Initial agreement amongst all stakeholders on the justification of the need of the development including market studies of existing/near term future COTS technology capabilities; 2. Initial confirmation that there is a market for the product other than the IAEA to reduce investment risk; 3. Agreement on an accelerated initial project schedule from request acceptance to commercial unit production including per unit cost and quantities; 4. During product development, obtaining periodic customer reaffirmation of the need and quantities for the product per the existing schedule and per unit price. (author)

  10. Fiscal planning of private electricity production projects

    International Nuclear Information System (INIS)

    Gauthier, R.

    2002-01-01

    Various fiscal considerations frequently encountered in the context of the planning of private electricity production projects were described. Two major themes were discussed: 1) the different jurisdictional vehicles that can be used during the planning of private electricity production projects and the associated fiscal considerations, and 2) the two main fiscal incentives of the Income Tax Act (Canada) which could impact on the financing and operation costs of such a project, namely the accelerated amortization and the possibility of deducting the costs associated to renewable energies and energy savings in Canada. This was a general presentation that did not go into specific details and did not represent a legal opinion. refs

  11. Dynamic and stochastic multi-project planning

    CERN Document Server

    Melchiors, Philipp

    2015-01-01

    This book deals with dynamic and stochastic methods for multi-project planning. Based on the idea of using queueing networks for the analysis of dynamic-stochastic multi-project environments this book addresses two problems: detailed scheduling of project activities, and integrated order acceptance and capacity planning. In an extensive simulation study, the book thoroughly investigates existing scheduling policies. To obtain optimal and near optimal scheduling policies new models and algorithms are proposed based on the theory of Markov decision processes and Approximate Dynamic programming.

  12. Project MOHAVE data analysis plan

    International Nuclear Information System (INIS)

    Watson, J.G.; Green, M.; Hoffer, T.E.; Lawson, D.R.; Pitchford, M.; Eatough, D.J.; Farber, R.J.; Malm, W.C.; McDade, C.E.

    1993-01-01

    Project MOHAVE is intended to develop ambient and source emissions data for use with source models, receptor models, and data analysis methods in order to explain the nature and causes of visibility degradation in the Grand Canyon. Approximately 50% of the modeling and data analysis effort will be directed toward understanding the contributions from the Mohave Power Project to haze in the Grand Canyon and other nearby Class areas; the remaining resources will be used to understand the contribution from other sources. The major goals of Project MOHAVE and data analysis are: to evaluate the measurement for applicability to modeling and data analysis activities; to describe the visibility, air quality and meteorology during the field study period and to determine the degree to which these measurements represent typical visibility events at the Grand Canyon; to further develop conceptual models of physical and chemical processes which affect visibility impairment at the Grand Canyon; to estimate the contributions from different emission sources to visibility impairment at the Grand Canyon, and to quantitatively evaluate the uncertainties of those estimates; to reconcile different scientific interpretations of the same data and to present this reconciliation to decision-makers. Several different approaches will be applied. Each approach will involve explicit examination of measurement uncertainties, compliance with implicit and explicit assumptions, and representativeness of the measurements. Scientific disagreements will be sought, expressed, explained, quantified, and presented. Data which can be used to verify methods will be withheld for independent evaluation of the validity of those methods. All assumptions will be stated and evaluated against reality. Data analysis results not supporting hypotheses will be presented with those results supporting the hypotheses. Uncertainty statements will be quantitative and consistent with decision-making needs

  13. Next Generation Nuclear Plant Project Preliminary Project Management Plan

    International Nuclear Information System (INIS)

    Dennis J. Harrell

    2006-01-01

    This draft preliminary project management plan presents the conceptual framework for the Next Generation Nuclear Plant (NGNP) Project, consistent with the authorization in the Energy Policy Act of 2005. In developing this plan, the Idaho National Laboratory has considered three fundamental project planning options that are summarized in the following section. Each of these planning options is literally compliant with the Energy Policy Act of 2005, but each emphasizes different approaches to technology development risks, design, licensing and construction risks, and to the extent of commercialization support provided to the industry. The primary focus of this draft preliminary project management plan is to identify those activities important to Critical Decision-1, at which point a decision on proceeding with the NGNP Project can be made. The conceptual project framework described herein is necessary to establish the scope and priorities for the technology development activities. The framework includes: A reference NGNP prototype concept based on what is judged to be the lowest risk technology development that would achieve the needed commercial functional requirements to provide an economically competitive nuclear heat source and hydrogen production capability. A high-level schedule logic for design, construction, licensing, and acceptance testing. This schedule logic also includes an operational shakedown period that provides proof-of-principle to establish the basis for commercialization decisions by end-users. An assessment of current technology development plans to support Critical Decision-1 and overall project progress. The most important technical and programmatic uncertainties (risks) are evaluated, and potential mitigation strategies are identified so that the technology development plans may be modified as required to support ongoing project development. A rough-order-of-magnitude cost evaluation that provides an initial basis for budget planning. This

  14. Project Hanford management contract quality improvement project management plan; TOPICAL

    International Nuclear Information System (INIS)

    ADAMS, D.E.

    1999-01-01

    On July 13, 1998, the U.S. Department of Energy, Richland Operations Office (DOE-RL) Manager transmitted a letter to Fluor Daniel Hanford, Inc. (FDH) describing several DOE-RL identified failed opportunities for FDH to improve the Quality Assurance (QA) Program and its implementation. In addition, DOE-RL identified specific Quality Program performance deficiencies. FDH was requested to establish a periodic reporting mechanism for the corrective action program. In a July 17, 1998 response to DOE-RL, FDH agreed with the DOE concerns and committed to perform a comprehensive review of the Project Hanford Management Contract (PHMC) QA Program during July and August, 1998. As a result, the Project Hanford Management Contract Quality Improvement Plan (QIP) (FDH-3508) was issued on October 21, 1998. The plan identified corrective actions based upon the results of an in-depth Quality Program Assessment. Immediately following the scheduled October 22, 1998, DOE Office of Enforcement and Investigation (EH-10) Enforcement Conference, FDH initiated efforts to effectively implement the QIP corrective actions. A Quality Improvement Project (QI Project) leadership team was assembled to prepare a Project Management Plan for this project. The management plan was specifically designed to engage a core team and the support of representatives from FDH and the major subcontractors (MSCs) to implement the QIP initiatives; identify, correct, and provide feedback as to the root cause for deficiency; and close out the corrective actions. The QI Project will manage and communicate progress of the process

  15. Cost-effective conservation planning: lessons from economics.

    Science.gov (United States)

    Duke, Joshua M; Dundas, Steven J; Messer, Kent D

    2013-08-15

    Economists advocate that the billions of public dollars spent on conservation be allocated to achieve the largest possible social benefit. This is "cost-effective conservation"-a process that incorporates both monetized benefits and costs. Though controversial, cost-effective conservation is poorly understood and rarely implemented by planners. Drawing from the largest publicly financed conservation programs in the United States, this paper seeks to improve the communication from economists to planners and to overcome resistance to cost-effective conservation. Fifteen practical lessons are distilled, including the negative implications of limiting selection with political constraints, using nonmonetized benefit measures or benefit indices, ignoring development risk, using incomplete cost measures, employing cost measures sequentially, and using benefit indices to capture costs. The paper highlights interrelationships between benefits and complications such as capitalization and intertemporal planning. The paper concludes by identifying the challenges at the research frontier, including incentive problems associated with adverse selection, additionality, and slippage. Copyright © 2013 Elsevier Ltd. All rights reserved.

  16. Integrating self-regulated learning and discovery learning into English lesson plan

    Directory of Open Access Journals (Sweden)

    Sayukti Ni Kadek Heny

    2018-01-01

    Full Text Available The notion of learner-centeredness has been embedded in the National Curriculum of Indonesia, 2013 Curriculum. However, most of the teachers seem to be hardly acquainted with the concept of Self-Regulated Learning (SRL and discovery learning in the lesson planning. Considering the phenomenon, this study intends to explore the concept of Self-Regulated Learning in the lesson plan of English subject for a tenth-grade level by employing a qualitative design with data obtained from a teacher-made lesson plan and a semi-structured interview. The researcher used content analysis to analyze the lesson plan. Meanwhile, the qualitative data from interview result were preceded through a coding sheet and transcribed modified figure. The findings revealed an integration of SRL cyclical phase and discovery learning in the teacher-made lesson plan. Based on the discussion, the results need to be applied in a considerably large context, in order to see thoroughly dynamic integration between Self-Regulated Learning model, lesson planning and the concept of learner autonomy.

  17. Transformation of topic-specific professional knowledge into personal pedagogical content knowledge through lesson planning

    Science.gov (United States)

    Stender, Anita; Brückmann, Maja; Neumann, Knut

    2017-08-01

    This study investigates the relationship between two different types of pedagogical content knowledge (PCK): the topic-specific professional knowledge (TSPK) and practical routines, so-called teaching scripts. Based on the Transformation Model of Lesson Planning, we assume that teaching scripts originate from a transformation of TSPK during lesson planning: When planning lessons, teachers use their TSPK to create lesson plans. The implementation of these lesson plans and teachers' reflection upon them lead to their improvement. Gradually, successful lesson plans are mentally stored as teaching scripts and can easily be retrieved during instruction. This process is affected by teacher's beliefs, motivation and self-regulation. In order to examine the influence of TSPK on teaching scripts as well as the moderating effects of beliefs, motivation and self-regulation, we conducted a cross-sectional study with n = 49 in-service teachers in physics. The TSPK, beliefs, motivation, self-regulation and the quality of teaching scripts of in-service teachers were assessed by using an online questionnaire adapted to teaching the force concept and Newton's law for 9th grade instruction. Based on the measurement of the quality of teaching scripts, the results provide evidence that TSPK influences the quality of teaching scripts. Motivation and self-regulation moderate this influence.

  18. National Security Technology Incubation Project Continuation Plan

    Energy Technology Data Exchange (ETDEWEB)

    None

    2008-09-30

    This document contains a project continuation plan for the National Security Technology Incubator (NSTI). The plan was developed as part of the National Security Preparedness Project (NSPP) funded by a Department of Energy (DOE)/National Nuclear Security Administration (NNSA) grant. This continuation plan describes the current status of NSTI (staffing and clients), long-term goals, strategies, and long-term financial solvency goals.The Arrowhead Center of New Mexico State University (NMSU) is the operator and manager of the NSTI. To realize the NSTI, Arrowhead Center must meet several performance objectives related to planning, development, execution, evaluation, and sustainability. This continuation plan is critical to the success of NSTI in its mission of incubating businesses with security technology products and services.

  19. Project scoping for lessons learnt to apply to the Celtic Seas marine sub-region

    OpenAIRE

    Twomey, Sarah; O'Mahony, Cathal

    2013-01-01

    This report involves a formal scoping exercise to identify lessons from a wide range of previous and current project and initiative experiences at the national, regional seas, European and global levels. An inventory of 77 projects and initiatives that are relevant with regard to the key activities proposed by the Celtic Seas Partnership has been compiled, as well as a short-list of 23 of the most pertinent projects, lessons learnt and contact names. This report has identified a number of syn...

  20. Lessons and challenges from adaptation pathways planning applications

    Science.gov (United States)

    Haasnoot, M.; Lawrence, J.; Kwakkel, J. H.; Walker, W.; Timmermans, J.; Bloemen, P.; Thissen, W.

    2015-12-01

    Planning for adaptation to dynamic risks (e.g., because of climate change) is a critical need. The concept of 'adaptive policies' is receiving increasing attention as a way of performing strategic planning that is able to address many of the inherent challenges of uncertainty and dynamic change. Several approaches for developing adaptive policies are available in the literature. One approach, for which several applications already exist, is Dynamic Adaptive Policy Pathways (DAPP). Pathway maps enable policy analysts, decision makers, and stakeholders to recognize potential 'locked-in' situations and to assess the flexibility, robustness, and efficacy of decision alternatives. Most of the applications of DAPP have been in deltas, coastal cities, or floodplains, often within the context of climate change adaptation. In this talk, we describe the DAPP approach and present a framework for designing signposts as adaptation signals, together with an illustrative application for the Rhine River in the Netherlands. We also draw lessons and challenges from pathways applications that differ in environment, culture, and institutional context. For example, the Dutch Delta Programme has used pathways to identify short-term decisions and long-term policy options. In Bangladesh, an application is in its early phase. Steps before generating pathways - such as long- term thinking in multiple possible futures and acknowledging uncertainties - are already a big challenge there. In New Zealand, the 'Sustainable Delta Game' has been used as the catalyst for pathways thinking by two local councils. This has led to its application in decision making for coastal and flood risk management and economic analysis of policy options.

  1. "Hamlet" Meets "Chushingura": Traditions of the Revenge Tragedy. [Lesson Plan].

    Science.gov (United States)

    2002

    This lesson seeks to sensitize students to the similarities and difference between cultures by comparing the Shakespearean and the Bunraki/Kabuki dramas of Japan. In the lesson, the focus of this comparison is the complex nature of revenge explored in "The Tragedy of Hamlet, Prince of Denmark" and "Chusingura," or "The…

  2. Energy Strategic Planning & Sufficiency Project

    Energy Technology Data Exchange (ETDEWEB)

    Retziaff, Greg

    2005-03-30

    This report provides information regarding options available, their advantages and disadvantages, and the costs for pursuing activities to advance Smith River Rancheria toward an energy program that reduces their energy costs, allows greater self-sufficiency and stimulates economic development and employment opportunities within and around the reservation. The primary subjects addressed in this report are as follows: (1) Baseline Assessment of Current Energy Costs--An evaluation of the historical energy costs for Smith River was conducted to identify the costs for each component of their energy supply to better assess changes that can be considered for energy cost reductions. (2) Research Viable Energy Options--This includes a general description of many power generation technologies and identification of their relative costs, advantages and disadvantages. Through this research the generation technology options that are most suited for this application were identified. (3) Project Development Considerations--The basic steps and associated challenges of developing a generation project utilizing the selected technologies are identified and discussed. This included items like selling to third parties, wheeling, electrical interconnections, fuel supply, permitting, standby power, and transmission studies. (4) Energy Conservation--The myriad of federal, state and utility programs offered for low-income weatherization and utility bill payment assistance are identified, their qualification requirements discussed, and the subsequent benefits outlined. (5) Establishing an Energy Organization--The report includes a high level discussion of formation of a utility to serve the Tribal membership. The value or advantages of such action is discussed along with some of the challenges. (6) Training--Training opportunities available to the Tribal membership are identified.

  3. LEGO robot vehicle lesson plans for secondary education : a recruitment tool.

    Science.gov (United States)

    2012-08-01

    Robotics is a great way to get kids excited about science, technology, engineering, and math (STEM) topics. It is also highly effective in stimulation development of teamwork and self-confidence. This project provides transportation-related lesson pl...

  4. Tunneling on the Yucca Mountain Project: Progress and lessons learned

    International Nuclear Information System (INIS)

    Hansmire, W.H.; Rogers, D.J.; Wightman, W.D.

    1996-01-01

    The Yucca Mountain Site Characterization Project is the US's effort to confirm the technical acceptability of Yucca Mountain as a repository for high-level nuclear waste. A key part of the site characterization project is the construction of a 7.8-km-long, 7.6-m-diameter tunnel for in-depth geologic and other scientific investigations. The work is governed in varying degrees by the special requirements for nuclear quality assurance, which imposes uncommon and often stringent limitations on the materials which can be used in construction, the tunneling methods and procedures used, and record-keeping for many activities. This paper presents the current status of what has been learned, how construction has adapted to meet the requirements, and how the requirements were interpreted in a mitigating way to meet the legal obligations, yet build the tunnel as rapidly as possible. With regard to design methodologies and the realities of tunnel construction, ground support with a shielded Tunnel Boring Machine is discussed. Notable lessons learned include the need for broad design analyses for a wide variety of conditions and how construction procedures affect ground support

  5. Educating for Freedom and Responsibility: Lessons From the First Amendment Schools Project

    Science.gov (United States)

    Mitchell, Cynthia

    2016-01-01

    The First Amendment Schools project holds rich lessons in how to change school cultures into "laboratories of democracy"--as well as in how to increase the odds of success for any school reform effort. School reform programs of any sort need to make sure to build in sustainability, to provide ways to spread their lessons beyond the…

  6. SEL/Project Language. Level II, Kindergarten, Volume II (Lessons 17-32).

    Science.gov (United States)

    Valladares, Ann E.; And Others

    This curriculum guide contains the Southeastern Education Laboratory/Project Language Lessons 17-32 stressing listening, speaking, and reading readiness for disadvantaged kindergarten children. The lessons are designed to be used in the SEL's mobile preschool units or as readiness materials for kindergarten. The major emphasis of this intervention…

  7. ADVANTAGES, DISADVANTAGES, AND LESSONS LEARNED FROM MULTI-REACTOR DECOMMISSIONING PROJECTS

    International Nuclear Information System (INIS)

    Morton, M.R.; Nielson, R.R.; Trevino, R.A.

    2003-01-01

    This paper discusses the Reactor Interim Safe Storage (ISS) Project within the decommissioning projects at the Hanford Site and reviews the lessons learned from performing four large reactor decommissioning projects sequentially. The advantages and disadvantages of this multi-reactor decommissioning project are highlighted

  8. Environmental management plan (EMP) for Melamchi water supply project, Nepal.

    Science.gov (United States)

    Khadka, Ram B; Khanal, Anil B

    2008-11-01

    More than 1.5 million people live in the Kathmandu valley. The valley is facing an extreme shortage of water supply. At the same time the demand is escalating rapidly. To address this issue of scarcity of water, the government of Nepal has proposed a project of inter-basin transfer of water from Melamchi River located 40 km north-east of the Kathmandu valley. The project will cover two districts and three municipalities and will potentially have significant impacts on the environment. In accordance with the Environmental Protection Regulation of Nepal (1997), the Melamchi Water Supply Project (MWSP) has undergone an EIA during the feasibility study stage of the proposed project. The recommendations contained in the EIA were integrated into the project design for implementation in 2006. This paper summarizes the background of MWSP, the environmental concerns described in the EIA and the status of Environmental Management Plan (EMP) developed to address environmental compliance and other issues involving participation and support of the local people. This paper also provides some lessons to learn on the modalities of addressing the demands and grievances of the local people concerning environmental management.

  9. Assessment of Understanding: Student Teachers' Preparation, Implementation and Reflection of a Lesson Plan for Science

    Science.gov (United States)

    Juhler, Martin Vogt

    2017-05-01

    Research finds that student teachers often fail to make observable instructional goals, without which a secure bridge between instruction and assessment is precluded. This is one reason that recent reports state that teacher education needs to become better at helping student teachers to develop their thinking about and skills in assessing pupils' learning. Currently in Europe, the Lesson Study method and the Content Representation tool, which both have a specific focus on assessment, have started to address this problem. This article describes and discusses an intervention in which Lesson Study was used in combination with Content Representation in student teachers' field practice. Empirical materials from one group of student teachers were analyzed to illustrate how the student teachers worked with assessment during the planning of a lesson, how they implemented it in a research lesson, and how they used the gathered observations to make claims about assessment aims. The findings suggest that the student teachers placed greater emphasis on assessment through the intervention. However, it is also found that more attention should have been dedicated to the planning phase and that the group did not manage to keep a research focus throughout the Lesson Study process. This suggests that it properly would be beneficial with several planning sessions prior to the research lesson, as well as having an expert teacher leading the Lesson Study.

  10. Project Plan IRRS Ireland 2015

    International Nuclear Information System (INIS)

    Ryan, T.

    2015-02-01

    . This time is in line with the requirements of both the Nuclear Safety Directive and the Radioactive Waste Directive. The project will be taking place in the context of the merger with EPA and when the mission happens in 2015 RPII will no longer exist. However, for now as RPII is the legal entity the term RPII will be used in this and associated documents but will be amended to EPA post merger

  11. The role of project planning in project management

    OpenAIRE

    Klitsenko, A. I.; Клиценко, А. И.

    2013-01-01

    This article describes the importance of the process of project planning. The author gives irrefutable arguments concerning crucial role of project planning. This article presents the definition, objects and the main goal of project planning. The purpose of this article is to review such objects of project planning as project scope, risk and human resources. Данная статья описывает важность процесса проектного планирования. Автор дает неопровержимые доводы, касающиеся решающей роли проектн...

  12. Spent Nuclear Fuel Project operational staffing plan

    International Nuclear Information System (INIS)

    Debban, B.L.

    1996-03-01

    Using the Spent Nuclear Fuel (SNF) Project's current process flow concepts and knowledge from cognizant engineering and operational personnel, an initial assessment of the SNF Project radiological exposure and resource requirements was completed. A small project team completed a step by step analysis of fuel movement in the K Basins to the new interim storage location, the Canister Storage Building (CSB). This analysis looked at fuel retrieval, conditioning of the fuel, and transportation of the fuel. This plan describes the staffing structure for fuel processing, fuel movement, and the maintenance and operation (M ampersand O) staffing requirements of the facilities. This initial draft does not identify the support function resources required for M ampersand O, i.e., administrative and engineering (technical support). These will be included in future revisions to the plan. This plan looks at the resource requirements for the SNF subprojects, specifically, the operations of the facilities, balances resources where applicable, rotates crews where applicable, and attempts to use individuals in multi-task assignments. This plan does not apply to the construction phase of planned projects that affect staffing levels of K Basins

  13. Saving Resources - Lesson plan of ESD in Geography

    Science.gov (United States)

    Iwamura, Takuya

    2010-05-01

    Geographical education has to perceive the world from diversified viewpoints by involving ESD (Education for Sustainable Development). This can be realized by teaching geography as an integrated science, including ESD that considers ecological, economic and social aspects.. In Japan especially, geographical education tends to emphasize the environmental aspects. The investigation of circumstances from diversified viewpoints helps to analyse the society scientifically and generates? the qualities of a global citizenship toward a sustainable society. And ESD aims at creating the values of sustainability, which is necessary for a global citizenship. In this context, I have developed the lesson plan of ESD in Geography at a secondary level.. Can advanced technologies foster sustainable development? The presentation shows the advanced technology-generated products and analyses the merits and failures with their effects on the global society. The examples of these products are hybrid cars and mobile phones. Cars are necessary for the mobility of our widespread modern society. On the other hand, it is also true that environmental pollution is becoming more serious by the increasing number of cars. We usually assume that economic development and environmental protection are contradictory. But hybrid cars which are coming to world attention now, have good gas mileage compared with normal cars, so they can conserve energy and cut down on the amount of exhaust at the same time. Mobile phones are necessary in business situations, as a tool that helps to communicate while moving. In addition, mobile phones are means that support the life of people living in sparsely populated areas like in Northern Europe. Here, we can curb costs for transmission facilities that were needed otherwise. There is one thing that underlies these advanced technology-generated products such as hybrid cars and mobile phones. The resource that makes the hybrid car technology and the miniaturization of

  14. New Production Reactor project-management plan

    International Nuclear Information System (INIS)

    McCrosson, F.J.; Hibbard, L.; Buckner, M.R.

    1982-01-01

    This document provides a project management plan for the first phase of a project to design and build a new production reactor (NPR) at SRP. The design of the NPR is based upon proven SRP heavy water reactor design, with several enhancements such as full containment, moderator detritiation, improved cooling, and modernized control rooms and instrumentation. The first phase of the NPR project includes environmental and safety analyses, preparation of the technical data summary and basic data, site studies, engineering studies, and conceptual design. The project management plan was developed by a 14-member task force comprised of representatives from the Technical Division, the Manufacturing Division, the Departmental Engineer's Office, and the Engineering Department

  15. Project Execution Plan,Rev. 3; FINAL

    International Nuclear Information System (INIS)

    IT Corporation, Las Vegas

    2002-01-01

    This plan addresses project activities encompassed by the U.S. Department of Energy's (DOE's), National Nuclear Security Administration Nevada Operations Office, Environmental Restoration Division and conforms to the requirements contained in the Life-Cycle Asset Management, DOE Order 430.1A; The Joint Program Office Policy on Project Management in Support of DOE Order 430.1; Program and Project Management for the Acquisition of Capital Assets, DOE Order 413.3; the Project Execution and Engineering Management Planning Guide, GPG-FM-010; and other applicable Good Practice Guides; and the FY 2001 Integrated Planning, Accountability, and Budgeting System Policy Guidance. The plan also reflects the milestone philosophies of the Federal Facility Agreement and Consent Order, as agreed to by the State of Nevada, the DOE, and the U.S. Department of Defense; and traditional project management philosophies such as the development of life-cycle costs, schedules, and work scope; identification o f roles and responsibilities; and baseline management and controls

  16. AVLIS Production Plant Project Management Plan

    International Nuclear Information System (INIS)

    1984-01-01

    The AVLIS Production Plant is designated as a Major System Acquisition (in accordance with DOE Order 4240.IC) to deploy Atomic Vapor Laser Isotope Separation (AVLIS) technology at the Oak Ridge, Tennessee site, in support of the US Uranium Enrichment Program. The AVLIS Production Plant Project will deploy AVLIS technology by performing the design, construction, and startup of a production plant that will meet capacity production requirements of the Uranium Enrichment Program. The AVLIS Production Plant Project Management Plan has been developed to outline plans, baselines, and control systems to be employed in managing the AVLIS Production Plant Project and to define the roles and responsibilities of project participants. Participants will develop and maintain detailed procedures for implementing the management and control systems in agreement with this plan. This baseline document defines the system that measures work performed and costs incurred. This plan was developed by the AVLIS Production Plant Project staff of Martin Marietta Energy Systems, Inc. and Lawrence Livermore National Laboratory in accordance with applicable DOE directives, orders and notices. 38 figures, 19 tables

  17. Environmental Restoration Project - Systems Engineering Management Plan

    International Nuclear Information System (INIS)

    Anderson, T.D.

    1998-06-01

    This Environmental Restoration (ER) Project Systems Engineering Management Plan (SEMP) describes relevant Environmental Restoration Contractor (ERC) management processes and shows how they implement systems engineering. The objective of this SEMP is to explain and demonstrate how systems engineering is being approached and implemented in the ER Project. The application of systems engineering appropriate to the general nature and scope of the project is summarized in Section 2.0. The basic ER Project management approach is described in Section 3.0. The interrelation and integration of project practices and systems engineering are outlined in Section 4.0. Integration with sitewide systems engineering under the Project Hanford Management Contract is described in Section 5.0

  18. Cesium legacy safety project management work plan

    International Nuclear Information System (INIS)

    Durham, J.S.

    1998-01-01

    This Management Work Plan (MWP) describes the process flow, quality assurance controls, and the Environment, Safety, and Health requirements of the Cesium Legacy Safety Project. This MWP provides an overview of the project goals and methods for repackaging the non-conforming Type W overpacks and packaging the CsCl powder and pellets. This MWP is not intended to apply to other activities associated with the CsCl Legacy Safety Program (i.e., clean out of South Cell)

  19. Bards and Beatles: Connecting Spontaneity to Structure in Lesson Plans.

    Science.gov (United States)

    Cox, Mitch

    1991-01-01

    Describes how one teacher provides minimally structured lessons that encourage senior high school students to carry their learning beyond the classroom. Describes units on business communication, research, British literature, and independent reading. (MG)

  20. Pu-238 Supply Program Project Execution Plan

    International Nuclear Information System (INIS)

    Wham, Robert M.; Martin, Sherman

    2012-01-01

    This Pu-238 Supply Program Project Execution Plan (PEP) summarizes critical information and processes necessary to manage the program. The PEP is the primary agreement regarding planning and objectives between The Department of Energy Office of Nuclear Energy (DOE NE-75), Oak Ridge National Laboratory Site Office (OSO) and the Oak Ridge National Laboratory (ORNL). The acquisition executive (AE) will approve the PEP. The PEP is a living document that will be reviewed and revised periodically until the project is complete. The purpose of the project is to reestablish the capability to produce plutonium-238 (Pu-238) domestically. This capability consists primarily of procedures, processes, and design information, not capital assets. As such, the project is not subject to the requirements of DOE O 413.3B, but it will be managed using the project management principles and best practices defined there. It is likely that some capital asset will need to be acquired to complete tasks within the project. As these are identified, project controls and related processes will be updated as necessary. Because the project at its initiation was envisioned to require significant capital assets, Critical Decision 0 (CD-0) was conducted in accordance with DOE O 413.3B, and the mission need was approved on December 9, 2003, by William Magwood IV, director of the Office of Nuclear Energy (NE), Science and Technology, DOE. No date was provided for project start-up at that time. This PEP is consistent with the strategy described in the June 2010 report to Congress, Start-up Plan for Plutonium-238 Production for Radioisotope Power Systems.

  1. Spent Nuclear Fuel Project dose management plan

    International Nuclear Information System (INIS)

    Bergsman, K.H.

    1996-03-01

    This dose management plan facilitates meeting the dose management and ALARA requirements applicable to the design activities of the Spent Nuclear Fuel Project, and establishes consistency of information used by multiple subprojects in ALARA evaluations. The method for meeting the ALARA requirements applicable to facility designs involves two components. The first is each Spent Nuclear Fuel Project subproject incorporating ALARA principles, ALARA design optimizations, and ALARA design reviews throughout the design of facilities and equipment. The second component is the Spent Nuclear Fuel Project management providing overall dose management guidance to the subprojects and oversight of the subproject dose management efforts

  2. Salt Repository Project. FY-84 technical project plan

    International Nuclear Information System (INIS)

    1984-08-01

    The FY 84 technical plans for the Salt Repository Project (SRP) are briefly presented. The objectives of the project in relation to the Civilian Radioactive Waste Management (CRWM) program are discused and the technical activities directed toward accomplishing these objectives are detailed. A budget is presented for each of the Level 2 Work Breakdown Structure Tasks (Systems, Waste Package, Site, Repository, Regulatory and Institutional, Test Facilities, Exploratory Shaft, Land Acquisition, and Program Management) in an appendix. An overall description, current status, and planned activities are presented for each of the subtasks which make up the above-mentioned Level 2 tasks. Milestones and their definitions for the plan year, as well as milestones for the outyears are also presented at this same subtask level for each subtask

  3. Resources to Support Faculty Writing Data Management Plans: Lessons Learned from an Engineering Pilot

    Directory of Open Access Journals (Sweden)

    Natsuko H. Nicholls

    2014-07-01

    Full Text Available Recent years have seen a growing emphasis on the need for improved management of research data. Academic libraries have begun to articulate the conceptual foundations, roles, and responsibilities involved in data management planning and implementation. This paper provides an overview of the Engineering data support pilot at the University of Michigan Library as part of developing new data services and infrastructure. Through this pilot project, a team of librarians had an opportunity to identify areas where the library can play a role in assisting researchers with data management, and has put forth proposals for immediate steps that the library can take in this regard. The paper summarizes key findings from a faculty survey and discusses lessons learned from an analysis of data management plans from accepted NSF proposals. A key feature of this Engineering pilot project was to ensure that these study results will provide a foundation for librarians to educate and assist researchers with managing their data throughout the research lifecycle.

  4. Spent Nuclear Fuel Project Document Management Plan

    International Nuclear Information System (INIS)

    Connor, M.D.; Harizison, G.L.; Rice, W.C.

    1995-12-01

    The SNF Project Document Management Plan identifies and describes the currently available systems and processes for implementing and maintaining an effective document control and records management program. This program governs the methods by which documents are generated, released, distributed, maintained current, retired, and ultimately disposed

  5. National Ignition Facility project acquisition plan

    International Nuclear Information System (INIS)

    Callaghan, R.W.

    1996-04-01

    The purpose of this National Ignition Facility Acquisition Plan is to describe the overall procurement strategy planned for the National Ignition Facility (NIF) Project. The scope of the plan describes the procurement activities and acquisition strategy for the following phases of the NIF Project, each of which receives either plant and capital equipment (PACE) or other project cost (OPC) funds: Title 1 and 2 design and Title 3 engineering (PACE); Optics manufacturing facilitization and pilot production (OPC); Convention facility construction (PACE); Procurement, installation, and acceptance testing of equipment (PACE); and Start-up (OPC). Activities that are part of the base Inertial Confinement Fusion (ICF) Program are not included in this plan. The University of California (UC), operating Lawrence Livermore National Laboratory (LLNL) and Los Alamos National Laboratory, and Lockheed-Martin, which operates Sandia National Laboratory (SNL) and the University of Rochester Laboratory for Laser Energetics (UR-LLE), will conduct the acquisition of needed products and services in support of their assigned responsibilities within the NIF Project structure in accordance with their prime contracts with the Department of Energy (DOE). LLNL, designated as the lead Laboratory, will have responsibility for all procurements required for construction, installation, activation, and startup of the NIF

  6. UMTRA Project environmental, health, and safety plan

    International Nuclear Information System (INIS)

    1989-02-01

    The basic health and safety requirements established in this plan are designed to provide guidelines to be applied at all Uranium Mill Tailings Remedial Action (UMTRA) Project sites. Specific restrictions are given where necessary. However, an attempt has been made to provide guidelines which are generic in nature, and will allow for evaluation of site-specific conditions. Health and safety personnel are expected to exercise professional judgment when interpreting these guidelines to ensure the health and safety of project personnel and the general population. This UMTRA Project Environmental, Health, and Safety (EH ampersand S) Plan specifies the basic Federal health and safety standards and special DOE requirements applicable to this program. In addition, responsibilities in carrying out this plan are delineated. Some guidance on program requirements and radiation control and monitoring is also included. An Environmental, Health, and Safety Plan shall be developed as part of the remedial action plan for each mill site and associated disposal site. Special conditions at the site which may present potential health hazards will be described, and special areas that should should be addressed by the Remedial Action Contractor (RAC) will be indicated. Site-specific EH ampersand S concerns will be addressed by special contract conditions in RAC subcontracts. 2 tabs

  7. Salt Repository Project: FY 85 technical project plan

    International Nuclear Information System (INIS)

    1985-07-01

    The FY 85 technical plan for the Salt Repository Project is briefly presented. The objectives of the project in relation to the Civilian Radioactive Waste Management Program are discussed, and the technical activities directed toward accomplishing these objectives are detailed. A budget is presented for each of the Level 2 work breakdown structure tasks (Systems, Waste Package, Site, Repository, Regulatory and Institutional, Exploratory Shaft, Test Facilities, Land Acquisition, and Project Management) in the various sections. An overall description, current status, and planned activities are presented for each of the subtasks which make up the above-mentioned Level 2 tasks. A strategy diagram and a master schedule are included and each of the milestones is also listed chronologically in the sections

  8. The Construction and Pilot Application of a Scoring Rubric for Creative Drama Lesson Planning

    Science.gov (United States)

    Korkut, Perihan

    2018-01-01

    Instructional planning is an important part of successful teaching. Therefore, quality lesson planning is accepted as an important indicator of teacher knowledge and ability. This is no different for creative drama. Although drama is strongly rooted in the participating group's creativity and spontaneity, its success depends on a careful and…

  9. Literacy Models and the Reconstruction of History Education: A Comparative Discourse Analysis of Two Lesson Plans

    Science.gov (United States)

    Collin, Ross; Reich, Gabriel A.

    2015-01-01

    This article presents discourse analyses of two lesson plans designed for secondary school history classes. Although the plans focus on the same topic, they rely on different models of content area literacy: disciplinary literacy, or reading and writing like experts in a given domain, and critical literacy, or reading and writing to address…

  10. The Planning of Teaching in the Context of Lesson Study: Research Findings

    Science.gov (United States)

    Kanellopoulou, Eurydice-Maria; Darra, Maria

    2018-01-01

    The main purpose of the present study is to examine the attitudes, perceptions and experiences of the teachers participating in the planning of teaching in the context of the Lesson Study. The present work, which is part of a wider research effort, followed a mixed methodological planning for reasons of triangulation. The survey was conducted from…

  11. Subjective risk assessment for planning conservation projects

    International Nuclear Information System (INIS)

    Game, Edward T; Fitzsimons, James A; Lipsett-Moore, Geoff; McDonald-Madden, Eve

    2013-01-01

    Conservation projects occur under many types of uncertainty. Where this uncertainty can affect achievement of a project’s objectives, there is risk. Understanding risks to project success should influence a range of strategic and tactical decisions in conservation, and yet, formal risk assessment rarely features in the guidance or practice of conservation planning. We describe how subjective risk analysis tools can be framed to facilitate the rapid identification and assessment of risks to conservation projects, and how this information should influence conservation planning. Our approach is illustrated with an assessment of risks to conservation success as part of a conservation plan for the work of The Nature Conservancy in northern Australia. Risks can be both internal and external to a project, and occur across environmental, social, economic and political systems. Based on the relative importance of a risk and the level of certainty in its assessment we propose a series of appropriate, project level responses including research, monitoring, and active amelioration. Explicit identification, prioritization, and where possible, management of risks are important elements of using conservation resources in an informed and accountable manner. (letter)

  12. FY95 software project management plan: TMACS, CASS computer systems

    International Nuclear Information System (INIS)

    Spurling, D.G.

    1994-01-01

    The FY95 Work Plan for TMACS and CASS Software Projects describes the activities planned for the current fiscal year. This plan replaces WHC-SD-WM-SDP-008. The TMACS project schedule is included in the TWRS Integrated Schedule

  13. The Global Polio Eradication Initiative: Progress, Lessons Learned, And Polio Legacy Transition Planning.

    Science.gov (United States)

    Cochi, Stephen L; Hegg, Lea; Kaur, Anjali; Pandak, Carol; Jafari, Hamid

    2016-02-01

    The world is closer than ever to achieving global polio eradication, with record-low polio cases in 2015 and the impending prospect of a polio-free Africa. Tens of millions of volunteers, social mobilizers, and health workers have participated in the Global Polio Eradication Initiative. The program contributes to efforts to deliver other health benefits, including health systems strengthening. As the initiative nears completion after more than twenty-five years, it becomes critical to document and transition the knowledge, lessons learned, assets, and infrastructure accumulated by the initiative to address other health goals and priorities. The primary goals of this process, known as polio legacy transition planning, are both to protect a polio-free world and to ensure that investments in polio eradication will contribute to other health goals after polio is completely eradicated. The initiative is engaged in an extensive transition process of consultations and planning at the global, regional, and country levels. A successful completion of this process will result in a well-planned and -managed conclusion of the initiative that will secure the global public good gained by ending one of the world's most devastating diseases and ensure that these investments provide public health benefits for years to come. Project HOPE—The People-to-People Health Foundation, Inc.

  14. Lessons from the Contraceptive CHOICE Project: The Hull LARC Initiative

    Science.gov (United States)

    Trussell, James; Guthrie, Kate

    2014-01-01

    Aim To discover whether a hand-out explaining the benefits of intrauterine contraceptives (IUCs) and implants could increase their uptake in Hull, UK. Methods We developed a simple double-sided A4 hand-out. On one side was a script with pictures of copper and levonorgestrel IUCs beside a 20-pence coin and of an implant beside a hairgrip. On the other side was the three-tiered effectiveness chart published in the textbook Contraceptive Technology. We implemented the project in family planning (FP), abortion and antenatal clinics and GP practices. The plan was that the receptionist would give the hand-out to every woman and ask her to read it before seeing a clinician. We evaluated it in FP clinics and GP practices because routine electronic monitoring reports were available only for these. Results There was no impact in GP practices. There was no overall impact in FP clinics, with the exception of the service hub, in which there was an increase in the proportion of women receiving IUCs or implants of 15.0% between the periods October 2011-April 2012 and May 2012-November 2012 (p=0.0002). This clinic is open on six days per week and has permanent sexual health staff on the reception desk. Impact fell when a change in clinic procedure. The proportion returned to baseline in December 2012-November 2013, when a change in clinic procedure to reduce waiting times caused staff to stop dispensing handouts. Conclusion This was not a formal study, so there was no research coordinator to monitor the project. We think there was no impact among GPs because the project was never implemented by them. The project was poorly implemented at the four satellite FP clinics. Only the service hub implemented the project, where it had a clear impact. We conclude that when implemented as intended this simple extremely low-cost LARC intervention was highly effective and also extremely cost effective. PMID:25236471

  15. 33 CFR 385.24 - Project Management Plans.

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Project Management Plans. 385.24... Processes § 385.24 Project Management Plans. (a) General requirements. (1) The Corps of Engineers and the... agencies, develop a Project Management Plan prior to initiating activities on a project. (2) The Project...

  16. Project LEAN--lessons learned from a national social marketing campaign.

    Science.gov (United States)

    Samuels, S E

    1993-01-01

    The Henry J. Kaiser Family Foundation initiated a social marketing campaign in 1987 to reduce the nation's risk for heart disease and some cancers. Consensus on recommendations for dietary change have stimulated the development of a variety of social marketing campaigns to promote behavior change. Project LEAN (Low-Fat Eating for America Now) is a national campaign whose goal is to reduce dietary fat consumption to 30 percent of total calories through public service advertising, publicity, and point-of-purchase programs in restaurants, supermarkets, and school and worksite cafeterias. The public service advertising reached 50 percent of the television viewing audience and the print publicity, more than 35 million readers. The toll-free hotline received more than 300,000 calls. Thirty-four organizations joined the foundation in partnership and raised $350,000 for collaborative activities. Thirteen States implemented local campaigns. Lessons have been learned about the use of the media, market segmentation, effective spokespersons, and successful partnerships. These lessons will be valuable to others planning social marketing campaigns on nutrition and other preventive behaviors.

  17. Effective Lesson Planning: Field Trips in the Science Curriculum

    Science.gov (United States)

    Rieger, C. R.

    2010-10-01

    Science field trips can positively impact and motivate students. However, if a field trip is not executed properly, with appropriate preparation and follow-up reinforcement, it can result in a loss of valuable educational time and promote misconceptions in the students. This study was undertaken to determine if a classroom lesson before an out-of-the-classroom activity would affect learner gain more or less than a lesson after the activity. The study was based on the immersive theater movie ``Earth's Wild Ride'' coupled with a teacher-led Power Point lesson. The participants in the study were students in a sixth grade physical science class. The order of lessons showed no detectable effect on final learner outcomes. Based on pre- and post-testing, improvement in mean learning gain came from the teacher-led lesson independent of the movie. The visit to the immersive theater, however, had significant positive effects that did not show up in the quantitative results of the testing.

  18. Business System Planning Project, Preliminary System Design

    International Nuclear Information System (INIS)

    EVOSEVICH, S.

    2000-01-01

    CH2M HILL Hanford Group, Inc. (CHG) is currently performing many core business functions including, but not limited to, work control, planning, scheduling, cost estimating, procurement, training, and human resources. Other core business functions are managed by or dependent on Project Hanford Management Contractors including, but not limited to, payroll, benefits and pension administration, inventory control, accounts payable, and records management. In addition, CHG has business relationships with its parent company CH2M HILL, U.S. Department of Energy, Office of River Protection and other River Protection Project contractors, government agencies, and vendors. The Business Systems Planning (BSP) Project, under the sponsorship of the CH2M HILL Hanford Group, Inc. Chief Information Officer (CIO), have recommended information system solutions that will support CHG business areas. The Preliminary System Design was developed using the recommendations from the Alternatives Analysis, RPP-6499, Rev 0 and will become the design base for any follow-on implementation projects. The Preliminary System Design will present a high-level system design, providing a high-level overview of the Commercial-Off-The-Shelf (COTS) modules and identify internal and external relationships. This document will not define data structures, user interface components (screens, reports, menus, etc.), business rules or processes. These in-depth activities will be accomplished at implementation planning time

  19. SRP [Salt Repository Project] configuration management plan

    International Nuclear Information System (INIS)

    1987-01-01

    This configuration management plan describes the organization, policies, and procedures that will be used on the Salt Repository Project (SRP) to implement the configuration management disciplines and controls. Configuration management is a part of baseline management. Baseline management is defined in the SRP Baseline Procedures Notebook and also includes cost and schedule baselines. Configuration management is a discipline applying technical and administrative direction and surveillance to identify and document the functional and physical characteristics of an item, to control changes to those characteristics, to record and report change processing and implementation status, and to audit the results. Configuration management is designed as a project management tool to determine and control baselines, and ensure and document all components of a project interface both physically and functionally. The purpose is to ensure that the product acquired satisfies the project's technical and operational requirements, and that the technical requirements are clearly defined and controlled throughout the development and acquisition process. 5 figs

  20. Egyptian Symbols and Figures. Hieroglyphs [and] Scroll Paintings. [Lesson Plan].

    Science.gov (United States)

    2002

    This lesson introduces students to the writing, art, and religious beliefs of ancient Egypt through hieroglyphs, one of the oldest writing systems in the world, and through tomb paintings. Hieroglyphs consist of pictures of familiar objects that represent sounds and were used in ancient Egypt from about 3100 BC to 400 CE. In the first part of the…

  1. Lessons-learned from ongoing decommissioning project of Fugen NPS

    International Nuclear Information System (INIS)

    Tezuka, M.; Koda, Y.; Iguchi, Y.; Kato, Y.; Yanagihara, S.

    2017-01-01

    .g., narrow calf width leading to the reduction of secondary waste and remote-handle ability by using fiber laser. But this method has not yet been applied to reactor facilities throughout the world. Therefore for the safe and reliable dismantlement, laser cutting system in air will be organized and demonstration examinations to some equipment except core area will be carried out. Moreover, laser cutting system underwater should be also organized, taking a safety assessment data such as behavior of cutting dust. In the final stage, after inspection of dismantling procedure using mock-up device, after the core area is planning to be dismantled. This indicates an example of lessons-learned for the process of how the decommissioning program is planned and R and D for suitable technologies are implemented and they are applied to the final dismantlement process. (authors)

  2. 14 CFR 152.109 - Project eligibility: Airport planning.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Project eligibility: Airport planning. 152....109 Project eligibility: Airport planning. (a) Airport master planning. A proposed project for airport master planning is not approved unless— (1) The location of the existing or proposed airport is included...

  3. System engineering and science projects: lessons from MeerKAT

    Science.gov (United States)

    Kapp, Francois

    2016-08-01

    The Square Kilometre Array (SKA) is a large science project planning to commence construction of the world's largest Radio Telescope after 2018. MeerKAT is one of the precursor projects to the SKA, based on the same site that will host the SKA Mid array in the central Karoo area of South Africa. From the perspective of signal processing hardware development, we analyse the challenges that MeerKAT encountered and extrapolate them to SKA in order to prepare the System Engineering and Project Management methods that could contribute to a successful completion of SKA. Using the MeerKAT Digitiser, Correlator/Beamformer and Time and Frequency Reference Systems as an example, we will trace the risk profile and subtle differences in engineering approaches of these systems over time and show the effects of varying levels of System Engineering rigour on the evolution of their risk profiles. It will be shown that the most rigorous application of System Engineering discipline resulted in the most substantial reduction in risk over time. Since the challenges faced by SKA are not limited to that of MeerKAT, we also look into how that translates to a system development where there is substantial complexity in both the created system as well as the creating system. Since the SKA will be designed and constructed by consortia made up from the ten member countries, there are many additional complexities to the organisation creating the system - a challenge the MeerKAT project did not encounter. Factors outside of engineering, for instance procurement models and political interests, also play a more significant role, and add to the project risks of SKA when compared to MeerKAT.

  4. N Area Final Project Program Plan

    International Nuclear Information System (INIS)

    Day, R.S.; Duncan, G.M; Trent, S.J.

    1998-07-01

    The N Area Final Project Program Plan is issued for information and use by the U.S. Department of Energy (DOE), the Environmental Restoration Contractor (ERC) for the Hanford Site, and other parties that require workscope knowledge for the deactivation of N Reactor facilities and remediation of the 100-N Area. This revision to the program plan contains the updated critical path schedule to deactivate N Reactor and its supporting facilities, cleanout of the N Reactor Fuel Storage Basin (105-N Basin), and remediate the 100-N Area. This document reflects notable changes in the deactivation plan for N Reactor, including changes in deactivation status, the N Basin cleanout task, and 100-N Area remediation

  5. Lessons Learnt in the Development of Level 1 PUSPATI TRIGA Reactor Probability Safety Assessment: A Collaboration Project under the Norwegian Extra Budgetary Fund

    International Nuclear Information System (INIS)

    Mazleha Maskin; Tom, P.P.; Ahmad Hassan Sallehudin Mohd Sarif; Faizal Mohamed; Mohd Fazli Zakaria; Muhamad Puad Abu

    2014-01-01

    This article reports about the lessons learnt from the development of level 1 probabilistic safety assessment (PSA) project that was implemented under the IAEA mentoring program for TRIGA MARK II PUSPATI research reactor (RTP). As a project that involved more than 3 organizations, a strategic planning of the management and implementation of individual assignment is truly a hectic task. This report compiles all related activities from the forming of the Malaysian PSA team up to the final report submitted to the IAEA. (author)

  6. Boosting innovation in the water sector--the role and lessons learned from collaborative projects.

    Science.gov (United States)

    Alegre, H; Coelho, S T; Feliciano, J F; Matos, R

    2015-01-01

    A key worldwide challenge in most sectors is to boost the effective adoption of innovation, as underpinned by the new European Union research programme Horizon 2020, which focuses on increasing innovation in Europe from 2014 to 2020. This is particularly relevant in the water sector, often perceived as conservative and averse to change. This paper discusses the role that collaborative knowledge-transfer projects can play in effectively rolling out R&D in the water industry. LNEC (Laboratório Nacional de Engenharia Civil) has designed a structured model based on a phased programme and a network of utilities and researchers. The paper presents the core principles, the rationale, the model and methods used, and the theoretical background, as well as the project's impact, outcomes and products. The discussion highlights the lessons learnt and provides a formal analysis of the advantages of focusing on middle management as an effective entry point, even if innovation is needed across the organization. Making training materials, guidelines, use cases, data and software publicly available after the project's end has proven to have a decisive multiplying effect. The paper also argues in favour of the collaborative model as a basis for R&D sustainability, and details on-going and planned developments.

  7. Using Activity Theory to Examine How Teachers' Lesson Plans Meet Students' Learning Needs

    Science.gov (United States)

    Chizhik, Estella Williams; Chizhik, Alexander Williams

    2018-01-01

    How is lesson planning useful? This research study used Cultural Historical Activity Theory and intersubjectivity to answer this questions. This research explored to what extent teacher candidates' lesson plans (i.e., alignment among objectives, assessment, and instruction), and analyses of assessment data mediate their thinking about students'…

  8. Teaching Norwegian to Beginners: Six Principles to Guide Lesson Planning

    Directory of Open Access Journals (Sweden)

    Anna Krulatz

    2014-01-01

    Full Text Available Teaching a foreign language is no simple task. There are several factors to consider, from curriculum design, to material selection and lesson implementation, to assessment. The challenge, however, is even greater, if you are teaching a less commonly taught language such as Norwegian – a language spoken by fewer than six million native speakers, used almost exclusively in one country, and with a limited number of available pedagogical materials. Under such circumstances, the task of preparing high quality communicative lessons is immense, even for an experienced language instructor. The goal of this article is to present how a successful language lesson can be developed even if one is using a textbook that does not foster communicative competence. As an example, I am using a unit from a Norwegian textbook for beginners: På vei, often used in Norwegian as a second language course for adults in Norway. The lesson focuses on routines and times of the day, and it concludes with the students comparing and contrasting their daily routines with a partner. Prior to this lesson, students have learned to provide basic information about themselves (where they come from, what languages they speak, what they do for work, expressions for greetings and goodbyes, basic verbs relating to daily activities such as ‘snakker’ (to speak, ‘kjører’ (to drive, ‘kjøpper’ (to buy, ‘jobber’ (to work, ‘leser’ (to read, ‘scriver’ (to write, ordinal numerals, meals, some food items, some basic prepositions and locations, words for family members, and subject and object pronouns for all persons. If you were to closely follow the textbook in teaching this unit, you would begin by teaching the students how to tell time, then briefly go over some verbs to express daily routines, listen to and read a text titled ‘Jeg står opp klokka seks,’ a narrative about Monica’s day (Monica is one of the characters in the book, and finally ask the students

  9. The SNL/NM Classified Waste Landfill Excavation: Lessons Learned Moving from Planning to Implementation

    International Nuclear Information System (INIS)

    Galloway, Robert B; Slavin, Paula

    1999-01-01

    recycling of classified components, along with the associated costs and infrastmcture. Very stringent radiological controls were imposed on site operations during the planning phase. Radiological controls that are not justified significantly impact the efficiency and cost of operations. If the initial approach is too conservative, there should be well-defined provisions for scaling down the protective measures to reflect the actual risks. Once the effectiveness of early detection, monitoring, and surveys is proven, radiological controls and postings should be re-evaluated to verify that they are appropriate. High levels of heavy metals dust were not anticipated during the planning phase but were suspected, then confirmed, during material handling. Respiratory protection and monitoring were upgraded accordingly and the costs added to the baseline. In contrast to radiological constraints, industrial hygiene guidelines were worked into the process with a minimum of adverse impact. While a lot of unforeseen expenses occur, some expected costs can be reduced. During the planning phase, the anticipated need to adequately characterize a variety of radionuclides in soil led to using Large Area Gamma Spectroscopy (LAGS) to survey all the soil excavated. About a quarter of the way through the project, it was obvious that very little radioactive material was present in the excavated soils. Since all the soil is processed through a screen plant, producing a fairly homogeneous mix, a more common method of sampling soil piles was implemented to replace the LAGS unit, increase productivity, and reduce costs. In summary, the most important lesson is to expect and be ready to change. Excavating a landfill requires the flexibility to quickly adjust processes to handle the unknown variables, and close attention to detail so all the different facets of the project are kept under control

  10. Project management lessons learned from building the Wendelstein 7-x stellerator fusion research reactor

    Energy Technology Data Exchange (ETDEWEB)

    Freire-Gormaly, M.; Gittens, A.; Zhang, L., E-mail: m.freire.gormaly@utoronto.ca, E-mail: antonio.gittens@mail.utoronto.ca, E-mail: lavender.zhang@outlook.com [University of Toronto, Toronto, ON (Canada)

    2015-07-01

    Wendelstein 7-X (W7-X) is the world's largest 'stellerator' nuclear fusion reactor being commissioned in Greifswald, Germany. It will inform the international fusion energy test device (ITER). The complexity of W7- X added challenges since industrial expertise to manufacture components did not exist. The construction was completed eight years behind schedule and almost 100% over budget. Key take-away lessons in project management were revealed from W7-X which can be applied to any nuclear project. These lessons are aligned with the project management knowledge areas of schedule, stakeholder, procurement, scope, schedule, cost, communication, risk, quality, human resources and procurement management. (author)

  11. Project management lessons learned from building the Wendelstein 7-x stellerator fusion research reactor

    International Nuclear Information System (INIS)

    Freire-Gormaly, M.; Gittens, A.; Zhang, L.

    2015-01-01

    Wendelstein 7-X (W7-X) is the world's largest 'stellerator' nuclear fusion reactor being commissioned in Greifswald, Germany. It will inform the international fusion energy test device (ITER). The complexity of W7- X added challenges since industrial expertise to manufacture components did not exist. The construction was completed eight years behind schedule and almost 100% over budget. Key take-away lessons in project management were revealed from W7-X which can be applied to any nuclear project. These lessons are aligned with the project management knowledge areas of schedule, stakeholder, procurement, scope, schedule, cost, communication, risk, quality, human resources and procurement management. (author)

  12. Implementation of the Hungarian RW management project: Results and lessons

    International Nuclear Information System (INIS)

    Vigassy, J.; Czoch, I.; Ormai, P.

    1995-01-01

    In 1993, a National RW Management Project was launched to solve handling and disposal of LLW/ILW of the Paks Nuclear Power Plant and to elaborate a complex strategy for the management of radwastes from the NPP, including HLW, spent fuel and wastes from the decommissioning. It was intended to implement the project so as to have selected the possible site (or sites) for the LLW/ILW waste repository by 1996. This paper describes the first results of the nation-wide screening for suitable areas and the problems related to the comparative evaluation process to select potential sites for a surface or geological LLW/ILW disposal facility. International tenders were issued to find the most appropriate technology to reduce the quantity of liquid and solid radwaste in the Nuclear Power Plant. Their results will provide a better basis for planning the characteristics and quantity of radwaste. The applications revealed that supercompacting can be ordered as a service when the need arises, and thus it was possible to re-allocate the funding originally foreseen for the equipment to treat solid wastes. Great importance is attached in the Project to public acceptance and PR activity. An expert organization was selected in a two-phase bidding process, and it was decided that detailed exploration of a potential site will take place only if public acceptance is assured. The original program of the Hungarian RW Management Project was extended in 1994 to perform on-site underground investigations (with Canadian support) in a silt-stone formation. The first results confirm that this is a potential site for deep geological disposal of HLW. The financial and legal framework of the RW management is also to be solved. The new law on nuclear energy -- now in preparation -- will deal with that problem in one of its most important chapters, defining the responsibilities for RW management and the sources of funding

  13. Closure plan for the proposed Millennium Project

    International Nuclear Information System (INIS)

    Tuttle, S.; Sisson, R.

    1999-01-01

    A $2.2 billion expansion of the current oil sands operation has been proposed by Suncor Energy Inc. The expansion would more than double the productive capacity of the present facility. As part of the application for this expansion, called Project Millennium, a comprehensive closure plan has been developed and filed by the Corporation. The Plan includes a systematic evaluation of the area to be developed, a description of the development activities planned, and the goals and objectives of the Corporation in re-establishing the landforms and ecosystems concurrently with running the operation. The Plan envisages surface contouring as early as practicable during the mine development, soil reconstruction, and re-establishment of vegetation, surface drainage and wetlands. The Corporation undertakes to monitor the performance of the reclaimed areas based on landform performance, the impact of chemical constituents on the landscape and ecosystem sustainability. An annual monitoring report assessing herbaceous vegetation growth, major species composition, tree and shrub survival and growth rate, groundwater conditions, amount of precipitation, the utility of constructed wetlands for treatment of reclamation area seepage and runoff waters, and wildlife population changes, will be prepared annually. A future research program associated with the Reclamation and Closure Plan will also examine the effectiveness of the reclamation drainage system as fish habitat, and the potential of the proposed end-pit lake to provide a viable aquatic ecosystem. 8 refs., 2 figs

  14. Organisational development in general practice: lessons from practice and professional development plans (PPDPs

    Directory of Open Access Journals (Sweden)

    Hocking Paul

    2000-12-01

    Full Text Available Abstract Background Improving the quality and effectiveness of clinical practice is becoming a key task within all health services. Primary medical care, as organised in the UK is composed of clinicians who work in independent partnerships (general practices that collaborate with other health care professionals. Although many practices have successfully introduced innovations, there are no organisational development structures in place that support the evolution of primary medical care towards integrated care processes. Providing incentives for attendance at passive educational events and promoting 'teamwork' without first identifying organisational priorities are interventions that have proved to be ineffective at changing clinical processes. A practice and professional development plan feasibility study was evaluated in Wales and provided the experiential basis for a summary of the lessons learnt on how best to guide organisational development systems for primary medical care. Results Practice and professional development plans are hybrids produced by the combination of ideas from management (the applied behavioural science of organisational development and education (self-directed adult learning theories and, in conceptual terms, address the lack of effectiveness of passive educational strategies by making interventions relevant to identified system wide needs. In the intervention, each practice participated in a series of multidisciplinary workshops (minimum 4 where the process outcome was the production of a practice development plan and a set of personal portfolios, and the final outcome was a realised organisational change. It was apparent during the project that organisational admission to a process of developmental planning needed to be a stepwise process, where initial interest can lead to a fuller understanding, which subsequently develops into motivation and ownership, sufficient to complete the exercise. The advantages of

  15. Getting to Gender Equality in Energy Infrastructure : Lessons from Electricity Generation, Transmission, and Distribution Projects

    OpenAIRE

    Orlando, Maria Beatriz; Janik, Vanessa Lopes; Vaidya, Pranav; Angelou, Nicolina; Zumbyte, Ieva; Adams, Norma

    2018-01-01

    Getting to Gender Equality in Electricity Infrastructure: Lessons from Electricity Generation, Transmission, and Distribution Projects examines the social and gender footprint of large-scale electricity generation, transmission, and distribution projects to establish a foundation on which further research and replication of good practices can be built. The main impact pathways analyzed are...

  16. Innovative Work Practices and Lessons Learned at the N Area Deactivation Project

    International Nuclear Information System (INIS)

    Day, R.S.

    1999-01-01

    This report identifies many of the lessons learned, innovations,and effective work practices that derived from activities supporting the N Area Deactivation Project at the U.S. Department of Energy's (DOE) Hanford Site. The work practices discussed in this report may be applicable and beneficial to similar projects throughout the DOE complex

  17. Lessons Learned Report for the radioactive mixed waste land disposal facility (Trench 31, Project W-025)

    International Nuclear Information System (INIS)

    Irons, L.G.

    1995-01-01

    This report presents the lessons learned from a project that involved modification to the existing burial grounds at the Hanford Reservation. This project has been focused on the development and operation of a Resource Conservation and Recovery Act compliant landfill which will accept low-level radioactive wastes that have been placed in proper containers

  18. Experience in Use of Project Method during Technology Lessons in Secondary Schools of the USA

    Science.gov (United States)

    Sheludko, Inna

    2015-01-01

    The article examines the opportunities and prospects for the use of experience of project method during "technology lessons" in US secondary schools, since the value of project technology implementation experience into the educational process in the USA for ensuring holistic development of children, preparing them for adult life, in…

  19. Breaking the deadlock: lessons from cross-border spatial projects in Flanders and the Netherlands

    NARCIS (Netherlands)

    de Vries, J.

    2008-01-01

    This paper explores the specific characteristics of decision-making in cross-border spatial projects and draws some lessons for European territorial cooperation. This is done by examining three major infrastructure projects between the Netherlands and Flanders: the construction of a high-speed rail

  20. Lessons Learned from Net Zero Energy Assessments and Renewable Energy Projects at Military Installations

    Energy Technology Data Exchange (ETDEWEB)

    Callahan, M.; Anderson, K.; Booth, S.; Katz, J.; Tetreault, T.

    2011-09-01

    Report highlights the increase in resources, project speed, and scale that is required to achieve the U.S. Department of Defense (DoD) energy efficiency and renewable energy goals and summarizes the net zero energy installation assessment (NZEI) process and the lessons learned from NZEI assessments and large-scale renewable energy projects implementations at DoD installations.

  1. Project X Accelerator R and D Plan

    International Nuclear Information System (INIS)

    2008-01-01

    Project X is a high intensity proton facility conceived to support a world-leading program in neutrino and flavor physics over the next two decades at Fermilab. Project X is an integral part of the Fermilab Roadmap as described in the Fermilab Steering Group Report. Project X is based on an 8 GeV superconducting H-linac, paired with the existing (but modified) Main Injector and Recycler Ring, to provide in excess of 2 MW of beam power throughout the energy range 60-120 GeV, simultaneous with at least 100 kW of beam power at 8 GeV. The linac utilizes technology in common with the ILC over the energy range 0.6-8.0 GeV. Beam current parameters can be made identical to ILC resulting in identical rf generation and distribution systems. This alignment of ILC and Project X technologies allows for a shared development effort. The initial 0.6 GeV of the linac draws heavily on technology developed by Argonne National Laboratory for a facility for rare isotope beams. It is anticipated that the exact configuration and operating parameters of the linac will be defined through the R and D program and will retain alignment with the ILC plan as it evolves over this period. Utilization of the Recycler Ring as an H - stripper and accumulator ring is the key element that provides the flexibility to operate the linac with the same beam parameters as the ILC. The linac operates at 5 Hz with a total of 5.6 x 10 13 H - ions delivered per pulse. H - are stripped at injection into the Recycler in a manner that 'paints' the beam both transversely and longitudinally to reduce space charge forces. Following the 1 ms injection, the orbit moves off the stripping foil and circulates for 200 msec, awaiting the next injection. Following three such injections a total of 1.7 x 10 14 protons are transferred in a single turn to the Main Injector. These protons are then accelerated to 120 GeV and fast extracted to a neutrino target. The Main Injector cycle takes 1.4 seconds, producing approximately 2

  2. Lessons Learned by Community Stakeholders in the Massachusetts Childhood Obesity Research Demonstration (MA-CORD) Project, 2013–2014

    Science.gov (United States)

    Ganter, Claudia; Aftosmes-Tobio, Alyssa; Chuang, Emmeline; Kwass, Jo-Ann; Land, Thomas

    2017-01-01

    Introduction Childhood obesity is a multifaceted disease that requires sustainable, multidimensional approaches that support change at the individual, community, and systems levels. The Massachusetts Childhood Obesity Research Demonstration project addressed this need by using clinical and public health evidence-based methods to prevent childhood obesity. To date, little information is known about successes and lessons learned from implementing such large-scale interventions. To address this gap, we examined perspectives of community stakeholders from various sectors on successes achieved and lessons learned during the implementation process. Methods We conducted 39 semistructured interviews with key stakeholders from 6 community sectors in 2 low-income communities from November 2013 through April 2014, during project implementation. Interviews were audio-recorded, transcribed, and analyzed by using the constant comparative method. Data were analyzed by using QSR NVivo 10. Results Successes included increased parental involvement in children’s health and education, increased connections within participating organizations and within the broader community, changes in organizational policies and environments to better support healthy living, and improvements in health behaviors in children, parents, and stakeholders. Lessons learned included the importance of obtaining administrative and leadership support, involving key stakeholders early in the program planning process, creating buffers that allow for unexpected changes, and establishing opportunities for regular communication within and across sectors. Conclusion Study findings indicate that multidisciplinary approaches support health behavior change and provide insight into key issues to consider in developing and implementing such approaches in low-income communities. PMID:28125400

  3. 7 CFR 1219.50 - Budgets, programs, plans, and projects.

    Science.gov (United States)

    2010-01-01

    ... of appropriate programs, plans, or projects for advertising, sales promotion, other promotion, and... HASS AVOCADO PROMOTION, RESEARCH, AND INFORMATION Hass Avocado Promotion, Research, and Information... promotion, industry information, consumer information, and related research programs, plans, and projects...

  4. Development of Lesson Plans and Student Worksheets Based Socio-Scientific Issues on Pollution Environmental Topic

    Science.gov (United States)

    Rahayu, S.; Meyliana, M.; Arlingga, A.; Reny, R.; Siahaan, P.; Hernani, H.

    2017-09-01

    The aim of this study is to develop lesson plans and student worksheets based socio-scientific issues on pollution environmental topic for seventh-grade junior high school students. Environmental pollution topic split into several subtopics namely air pollution, water pollution and soil pollution. The composing of lesson plans were developed based on socio-scientific issues with five stages, namely (1) Motivate; (2) Challenge; (3) Collect scientific evidence; (4) Analyse the evidence; (5) Build knowledge and make connections; and (6) Use evidence. While student worksheets contain articles on socio-scientific issues, practice, and there are a few questions to determine students’ reasoning. The method that is used in this research is research and development (R & D method). Development model used in this study is a model of Plomp that consists of four stages, namely: (1) Initial Research; (2) Design; (3) Realization or Construction; (4) Testing, evaluation and revision; (5) Implementation, while the research was limited to the fourth stage. Lesson plans and student worksheets based on socio-scientific issues was validated through an expert validation. The result showed that lesson plans and student worksheets based socio-scientific issues on pollution theme have a very decent and be able to apply in science classroom.

  5. Beyond the Playing Field: Jackie Robinson, Civil Rights Advocate. Lesson Plan.

    Science.gov (United States)

    National Archives and Records Administration, Washington, DC.

    This packet provides primary source documents and lesson plans relating to the study of Jackie Robinson as a civil rights advocate. The legendary baseball player, Jack Roosevelt Robinson, was the first black man to "officially" play in the big leagues in the 20th century. Jackie Robinson was not only a stellar baseball player, but he…

  6. "The State of Chihuahua", Lesson Plan for "Cultural Unit: Focus on Mexico."

    Science.gov (United States)

    Llewellyn, Marianne

    This lesson plan was designed for students in Montana schools. The objectives for this culture unit are having: (1) students recognize the similarities between their home stat of Montana and the Mexican state of Chihuahua; (2) students learn about features unique to Chihuahua; and (3) students create an advertising brochure marketing Chihuahua to…

  7. Convincing American Women to Join in the Efforts to Win World War I: A Lesson Plan.

    Science.gov (United States)

    Sunal, Cynthia S.; Haas, Mary E.

    1994-01-01

    Asserts that World War I, unlike previous wars, was not fought by small groups of professional soldiers, but with large groups of citizens, including women. Presents a lesson plan using poster and postcards that examines methods used by the U.S. government to rally women to join the war effort. (CFR)

  8. Reflective Lesson Planning in Refresher Training Programs for Experienced Physics Teachers.

    Science.gov (United States)

    Chung, C. M.; And Others

    1995-01-01

    Reports on a refresher training program that introduces experienced physics teachers to a reflective lesson-planning model and a more constructivist approach to physics teaching. Three instructional strategies developed by participants in the program and the corresponding suggestions made by their peers are presented and analyzed. (29 references)…

  9. Culturally Responsive Education: Developing Lesson Plans for Vietnamese Students in the American Diaspora

    Science.gov (United States)

    Douglas, Cynthia M.

    2015-01-01

    This article focuses on the application of the philosophical principles of John Dewey and Culturally Responsive Education in the creation of lesson plans for Vietnamese students in the American Diaspora. Through a Fulbright-Hayes Program a group of teachers from the New York City Public School System and Long Island spent six weeks in Vietnam…

  10. Effects of Teacher Preparation Courses: Do Graduates Use What They Learned to Plan Mathematics Lessons?

    Science.gov (United States)

    Morris, Anne K.; Hiebert, James

    2017-01-01

    We investigated whether the content pre-service teachers studied in elementary teacher preparation mathematics courses was related to their performance on a mathematics lesson planning task 2 and 3 years after graduation. The relevant mathematics knowledge was studied when the teachers were freshmen, 5 to 6 years earlier. Results showed that when…

  11. Supporting Pre-Service Teachers in Designing Technology-Infused Lesson Plans

    Science.gov (United States)

    Janssen, N.; Lazonder, A. W.

    2016-01-01

    The present study compared the effectiveness of two types of just-in-time support for lesson planning. Both types contained the same technological information but differed regarding pedagogical and content information. The first type presented this information separately (i.e., separate support); the second type presented this information in an…

  12. Institutionalizing planning, enactment and reflection of daily lessons through appropriate organizational restructuring

    NARCIS (Netherlands)

    Raval, Harini; McKenney, Susan; Pieters, Julius Marie

    2011-01-01

    This study describes a professional development program aimed at supporting para-teachers in an Indian educational NGO to adopt learner-centered approaches. Organizational factors inhibiting para-teacher learning were modified. A routine of lesson planning before, and reflection after daily

  13. Planning lessons with learning platforms - problem and prospects for mathematics education

    DEFF Research Database (Denmark)

    Tamborg, Andreas Lindenskov

    2018-01-01

    is a key intention behind the implementation of the platform. It is also concluded that when the teachers succeed in using learning objectives actively in their planning, the objectives support the teachers in designing lessons that correspond with their intentions. The paper concludes with a discussion...

  14. Lesson plan profile of senior high school biology teachers in Subang

    Science.gov (United States)

    Rohayati, E.; Diana, S. W.; Priyandoko, D.

    2018-05-01

    Lesson plan have important role for biology teachers in teaching and learning process. The aim of this study was intended to gain an overview of lesson plan of biology teachers’ at Senior High Schools in Subang which were the members of biology teachers association in Subang. The research method was descriptive method. Data was collected from 30 biology teachers. The result of study showed that lesson plan profile in terms of subject’s identity had good category with 83.33 % of average score. Analysis on basic competence in fair category with 74.45 % of average score. The compatibility of method/strategy was in fair category with average score 72.22 %. The compatibility of instrument, media, and learning resources in fair category with 71.11 % of average score. Learning scenario was in good category with 77.00 % of average score. The compatibility of evaluation was in low category with 56.39 % of average score. It can be concluded that biology teachers in Subang were good enough in making lesson plan, however in terms of the compatibility of evaluation needed to be fixed. Furthermore, teachers’ training for biology teachers’ association was recommended to increasing teachers’ skill to be professional teachers.

  15. Salt Repository Project transportation program plan

    International Nuclear Information System (INIS)

    Fisher, R.L.; Greenberg, A.H.; Anderson, T.L.; Yates, K.R.

    1987-01-01

    The Salt Repository Project (SRP) has the responsibility to develop a comprehensive transportation program plan (TrPP) that treats the transportation of workers, supplies, and high-level radioactive waste to the site and the transportation of salt, low-level, and transuranic wastes from the site. The TrPP has developed a systematic approach to transportation which is directed towards satisfying statutes, regulations, and directives and is guided by a hierarchy of specific functional requirements, strategies, plans, and reports. The TrPP identifies and develops the planning process for transportation-related studies and provides guidance to staff in performing and documenting these activities. The TrPP also includes an explanation of the responsibilities of the organizational elements involved in these transportation studies. Several of the report chapters relate to identifying routes for transporting nuclear waste to the site. These include a chapter on identifying an access corridor for a new rail route leading to the site, identifying and evaluating emergency-response preparedness capabilities along candidate routes in the state, and identifying alternative routes from the state border, ports, or in-state reactors to the site. The TrPP also includes plans for identifying salt disposal routes and a discussion of repository/transportation interface requirements. 89 refs., 6 figs

  16. Project No. 8 - Final decommissioning plan

    International Nuclear Information System (INIS)

    2000-01-01

    Ignalina NPP should prepare the final Ignalina NPP unit 1 decommissioning plan by march 31, 2002. This plan should include the following : description of Ignalina NPP and the Ignalina NPP boundary that could be influenced by decommissioning process; decommissioning strategy selected and a logical substantiation for this selection; description of the decommissioning actions suggested and a time schedule for the actions to be performed; conceptual safety and environmental impact assessment covering ionizing radiation and other man and environment impact; description of the environmental monitoring program proposed during decommissioning process; description of the waste management proposed; assessment of decommissioning expenses including waste management, accumulated funds and other sources. Estimated project cost - 0.75 M EURO

  17. Lessons Learned and Flight Results from the F15 Intelligent Flight Control System Project

    Science.gov (United States)

    Bosworth, John

    2006-01-01

    A viewgraph presentation on the lessons learned and flight results from the F15 Intelligent Flight Control System (IFCS) project is shown. The topics include: 1) F-15 IFCS Project Goals; 2) Motivation; 3) IFCS Approach; 4) NASA F-15 #837 Aircraft Description; 5) Flight Envelope; 6) Limited Authority System; 7) NN Floating Limiter; 8) Flight Experiment; 9) Adaptation Goals; 10) Handling Qualities Performance Metric; 11) Project Phases; 12) Indirect Adaptive Control Architecture; 13) Indirect Adaptive Experience and Lessons Learned; 14) Gen II Direct Adaptive Control Architecture; 15) Current Status; 16) Effect of Canard Multiplier; 17) Simulated Canard Failure Stab Open Loop; 18) Canard Multiplier Effect Closed Loop Freq. Resp.; 19) Simulated Canard Failure Stab Open Loop with Adaptation; 20) Canard Multiplier Effect Closed Loop with Adaptation; 21) Gen 2 NN Wts from Simulation; 22) Direct Adaptive Experience and Lessons Learned; and 23) Conclusions

  18. Evaluation of participatory planning: Lessons from Hungarian Natura 2000 management planning processes.

    Science.gov (United States)

    Kovács, Eszter; Kelemen, Eszter; Kiss, Gabriella; Kalóczkai, Ágnes; Fabók, Veronika; Mihók, Barbara; Megyesi, Boldizsár; Pataki, György; Bodorkós, Barbara; Balázs, Bálint; Bela, Györgyi; Margóczi, Katalin; Roboz, Ágnes; Molnár, Dániel

    2017-12-15

    Stakeholder participation in nature conservation policies and especially in the management of protected areas has gained importance in the last decades. These changes are underlined by democratic principles and the perceived contribution of stakeholder involvement to the effectiveness of conservation management. Evaluating participatory processes is essential to learn about the past and thus increase the quality of future processes. The evaluation can be useful for the organisations responsible for planning and management, stakeholders and policy makers as well. The present paper shows the results of a systematic evaluation of 25 participatory processes related to the development of management plans for Natura 2000 sites in Hungary between 2007 and 2015. A conceptual framework was developed to evaluate the process and outcome of participatory management planning processes. Criteria were based on the scientific literature on public participation and tailored to conservation-related management planning and stakeholder involvement. Evaluated processes were grouped in three cases based on their time range and financial sources. Overall, the analysed processes scored at a medium level, showing better performance in the process criteria than in the outcome criteria. The best case scored significantly higher in four criteria compared to the other cases: representativeness, resource availability for facilitation, new, creative ideas and impact on the plan. The main factors behind the success were (1) embeddedness of the planning process in a larger project, where the plan was a tool for conservation, (2) carrying out only one process at a time, (3) previous experience of facilitators and planners with participatory planning and (4) the opportunity and capacity to propose a payment scheme as an incentive. But even this case received low scores in some criteria: conflict resolution, early involvement and well defined goals. Based on the results we suggest that more data is

  19. 300 Area Revitalization Project Management Plan

    International Nuclear Information System (INIS)

    Downey, H. D.

    1999-01-01

    The 300 Area Revitalization Team has been tasked with the responsibility to develop an integrated path forward for the 300 Area, as part of a commitment stemming from the 300 Area Disposition Workshop that was held on March 17, 1998. The integrated path forward that is needed must ensure that budget, schedule, and work scopes are complementary between the Programs that are involved in the 300Area. This Project Management Plan (PMP) defines the roles and responsibilities, and the overall approach, to development of a prioritized schedule for 300 Area activities that will achieve the end-state condition

  20. 78 FR 54949 - Major Project Financial Plan Guidance

    Science.gov (United States)

    2013-09-06

    ...'' (GA-090-751). That report recommended that Financial Plans include the cost of financing the project... Project Financial Plan Guidance AGENCY: Federal Highway Administration (FHWA), DOT. ACTION: Notice; Request for comments. SUMMARY: This notice requests comments on draft Major Project Financial Plan...

  1. Business System Planning Project, Alternatives Analysis

    International Nuclear Information System (INIS)

    EVOSEVICH, S.

    2000-01-01

    The CHG Chief Information Officer (CIO) requested a study of alternatives to the current business system computing environment. This Business Systems Planning (BSP) Project Alternatives Analysis document presents an analysis of the current Project Controls, Work Management, and Business Management systems environment and alternative solutions that support the business functions. The project team has collected requirements and priorities from stakeholders in each business area and documented them in the BSP System Requirements Specification (SRS), RPP-6297. The alternatives analysis process identifies and measures possible solutions in each of the business process areas against the requirements as documented in the SRS. The team gathered input from both internal and external sources to identify and grade the possible solutions. This document captures the results of that activity and recommends a suite of software products. This study was to select the best product based on how well the product met the requirements, not to determine the platform or hardware environment that would be used. Additional analysis documentation can be found in BSP project files

  2. Lessons learned from solar energy projects in Saudi Arabia

    International Nuclear Information System (INIS)

    Huraib, F.S.; Hasnain, S.M.; Alawaji, S.H.

    1996-01-01

    This paper describes the lessons learned from the major RD and D activities at Energy Research Institute (ERI), King Abdulaziz City for Science and Technology (KACST) in the field of solar energy. Photovoltaic, solar thermal dishes, solar water heating, solar water pumping and desalination, solar hydrogen production and utilization are some of the areas studied for solar energy applications. Recommendations and guidelines for future solar energy research, development, demonstration and dissemination in Saudi Arabia are also given. (Author)

  3. Sample management implementation plan: Salt Repository Project

    International Nuclear Information System (INIS)

    1987-01-01

    The purpose of the Sample Management Implementation Plan is to define management controls and building requirements for handling materials collected during the site characterization of the Deaf Smith County, Texas, site. This work will be conducted for the US Department of Energy Salt Repository Project Office (SRPO). The plan provides for controls mandated by the US Nuclear Regulatory Commission and the US Environmental Protection Agency. Salt Repository Project (SRP) Sample Management will interface with program participants who request, collect, and test samples. SRP Sample Management will be responsible for the following: (1) preparing samples; (2) ensuring documentation control; (3) providing for uniform forms, labels, data formats, and transportation and storage requirements; and (4) identifying sample specifications to ensure sample quality. The SRP Sample Management Facility will be operated under a set of procedures that will impact numerous program participants. Requesters of samples will be responsible for definition of requirements in advance of collection. Sample requests for field activities will be approved by the SRPO, aided by an advisory group, the SRP Sample Allocation Committee. This document details the staffing, building, storage, and transportation requirements for establishing an SRP Sample Management Facility. Materials to be managed in the facility include rock core and rock discontinuities, soils, fluids, biota, air particulates, cultural artifacts, and crop and food stuffs. 39 refs., 3 figs., 11 tabs

  4. Fernald closure project - Lessons learned in the execution of this successful project, completed October 2006

    International Nuclear Information System (INIS)

    Murphy, Cornelius; Reising, Johnny

    2007-01-01

    Available in abstract form only. Full text of publication follows: This paper explores the history and lessons learned on the United States' Department of Energy's (DoE's) Fernald Closure Project - from the completion of the uranium-production mission to the implementation of the Records of Decision defining the cleanup standards and the remedies that were achieved. Cleaning up Fernald and returning it to the people of Ohio was a $4.4 billion dollar mega environmental-remediation project that was completed in October 2006. During a period of nearly 37 years, Fernald produced 250,000 tons of high-purity, low-enriched uranium for the U.S. defense program, generating more than six million tons of liquid and solid waste as it carried out its Cold War mission. The facility was shut down in 1989 and clean up began in 1992, when Fluor won the contract to clean up the site. The project comprised four phases: 1. Determining the extent of damage to the environment and groundwater at, and adjacent to, the production facilities 2. Selecting cleanup criteria - final end states that had to be met to protect human health and the environment 3. Selecting and implementing the remedial actions that would meet the cleanup goals 4. Doing the work safely, compliantly and cost-effectively. In the project's early stages, there were strained relationships and total distrust between the local community and the DOE as a result of aquifer contamination and potential health effects to the workers and local residents. (authors)

  5. Tank Waste Remediation System Projects Document Control Plan

    International Nuclear Information System (INIS)

    Slater, G.D.; Halverson, T.G.

    1994-01-01

    The purpose of this Tank Waste Remediation System Projects Document Control Plan is to provide requirements and responsibilities for document control for the Hanford Waste Vitrification Plant (HWVP) Project and the Initial Pretreatment Module (IPM) Project

  6. Creating more effective health plan quality reports for consumers: lessons from a synthesis of qualitative testing.

    Science.gov (United States)

    Harris-Kojetin, L D; McCormack, L A; Jaël, E F; Sangl, J A; Garfinkel, S A

    2001-07-01

    Social marketing techniques such as consumer testing have only recently been applied to develop effective consumer health insurance information. This article discusses lessons learned from consumer testing to create consumer plan choice materials. Data were collected from 268 publicly and privately insured consumers in three studies between 1994 and 1999. Iterative testing and revisions were conducted to design seven booklets to help Medicaid, Medicare, and employed consumers choose a health plan. Standardized protocols were used in 11 focus groups and 182 interviews to examine the content, comprehension, navigation, and utility of the booklets. A method is suggested to help consumers narrow their plan choices by breaking down the process into smaller decisions using a set of guided worksheets. Implementing these lessons is challenging and not often done well. This article gives examples of evidence-based approaches to address cognitive barriers that designers of consumer health insurance information can adapt to their needs.

  7. Development of a harmonized approach to safety assessment of decommissioning: Lessons learned from international experience (DeSa project)

    International Nuclear Information System (INIS)

    Percival, K.; Nokhamzon, J.-G.; Ferch, R.; Batandjieva, B.

    2006-01-01

    The number of nuclear facilities being or planned to be shutdown as they reach the end of their design life, due to accidents or other political and social factors has been increasing worldwide. This has led to an increase in the awareness of regulators and operators of the importance of development and implementation of adequate safety requirements and criteria for decommissioning of these facilities. A general requirement at international and national levels, even for new facilities to be commissioned, is the development of a decommissioning plan, which includes evaluation of potential radiological consequences to public and workers during planned and accidental decommissioning activities. Experience has been gained in the safety assessment of decommissioning at various sites with different complexities and hazard potentials. This experience shows that various approaches have been used in conducting safety assessments and that there is a need for harmonisation of these approaches and for transferring the good practice and lessons learned to other countries, in particular developing countries with limited financial and human resources. The IAEA launched an international project on Evaluation and Demonstration of Safety during Decommissioning (DeSa) in 2004 to provide a forum for exchange of lessons learned between site operators, regulators, safety assessors and other specialists in safety assessment of decommissioning of nuclear power plants, research reactors, laboratories, nuclear fuel cycle facilities, etc. This paper presents the lessons learned through the project up to date, i.e.; (i) a common approach to safety assessment is being applied worldwide with the following steps - establishment of assessment framework; description of the facility; definition of decommissioning activities; hazard identification and analysis; calculation of consequences; and analysis of results; (ii) a deterministic approach to safety assessment is most commonly applied; (iii) a

  8. Lesson Plans for "Not for Ourselves Alone: The Story of Elizabeth Cady Stanton and Susan B. Anthony."

    Science.gov (United States)

    Prososki, Lisa; Krouse, Judith; Harper, Judith E.

    These lesson plans for high school students were developed to accompany the documentary film by Ken Burns and Paul Barnes which tells the story of Elizabeth Cady Stanton and Susan B. Anthony and their lifelong fight for women's rights. In the lessons students write editorials about women's rights around the world today, interview senior citizens…

  9. Learning with and about Advertising in Chemistry Education with a Lesson Plan on Natural Cosmetics--A Case Study

    Science.gov (United States)

    Belova, Nadja; Eilks, Ingo

    2015-01-01

    This paper describes a case study on the chemistry behind natural cosmetics in five chemistry learning groups (grades 7-11, age range 13-17) in a German comprehensive school. The lesson plan intends to promote critical media literacy in the chemistry classroom and specifically emphasizes learning with and about advertising. The lessons of four…

  10. Lessons learned: Managing the development of a corporate Ada training project

    Science.gov (United States)

    Blackmon, Linda F.

    1986-01-01

    The management lessons learned during the implementation of a corporate mandate to develop and deliver an effective Ada training program to all divisions are discussed. The management process involved in obtaining cooperation from all levels in the development of a corporate-wide project is described. The problem areas are identified along with some possible solutions.

  11. "It Reminded Me of What Really Matters": Teacher Responses to the Lessons from Auschwitz Project

    Science.gov (United States)

    Maitles, Henry; Cowan, Paula

    2012-01-01

    Since 2007, the Lessons from Auschwitz Project organised by the Holocaust Education Trust, has taken groups of Scottish senior school students (between 16 and 18 years) and where possible an accompanying teacher from their school, to Auschwitz-Birkenau Memorial and Museum as part of a process of increasing young people's knowledge and…

  12. Teacher Improvement Projects in Guinea: Lessons Learned from Taking a Program to National Scale.

    Science.gov (United States)

    Schwille, John; Dembele, Martial; Diallo, Alpha Mahmoudou

    2001-01-01

    Highlights lessons learned from a small, grant-funded teacher improvement project in Guinea that went nationwide, including: it is possible to make such a system work on a national scale in a resource-scarce country; effective initial and continued training is critical for all participants; it is difficult to provide close-to-school assistance…

  13. Strategic Planning for Emergencies: Lessons Learned from Katrina

    International Nuclear Information System (INIS)

    Hamilton, M. G.; Mashhadi, H.; Habeck, D.

    2007-01-01

    The tragedy that was unleashed when hurricane Katrina hit the United States southern coast and most particularly New Orleans is still being examined. Regardless of the allocation of blame for the response, or lack thereof, several very important components of what needs to be included in effective strategic, management, and response plans were revealed in the aftermath. The first tenet is to be sure not to make the problem worse. In other words, the goal is to prevent emergencies from becoming a disaster that subsequently grows to a catastrophe. Essential components that need to be addressed start with protection and rescue of affected people. Several characteristics of an effective strategic plan that will address saving lives include leadership, continuity of government and business, effective communications, adequate evacuation plans and security of electronic infrastructure. Katrina analysis confirms that the process to integrate all the components is too complex to be accomplished ad hoc. This presentation will outline objective methodology to successfully integrate the various facets that comprise an effective strategic plan, management plan, and tactical plans.(author)

  14. Lessons learned from the NRU vessel leak repair and return to service projects

    International Nuclear Information System (INIS)

    Heeney, P.; Turcotte, J.

    2011-01-01

    In May 2009 the National Research Universal (NRU) reactor was shut down due to a small leak detected from the reactor vessel into the annulus surrounding the reactor. What ensued was a challenging, yet successful, 15 month long Repair and Return to Service Outage. This Repair and Return to Service Outage presented many first-of-a-kind challenges that provide learning opportunities which have been incorporated into subsequent planned outages. These lessons learned are invaluable tools to be used in the planning and execution of future outages. Following the repair of the NRU vessel, AECL was required to conduct annual inspections of the vessel wall. These inspections require an annual Extended Outage (up to 4 weeks in length). A planned Extended Outage was conducted in May/June 2011 and provided an opportunity to implement some of the lessons learned during the Repair and Return to Service Outage. Lessons learned from that Extended Outage have been incorporated in the subsequent monthly maintenance outages, with lessons learned sessions being held after each outage to ensure that the execution of outages is constantly improving. (author)

  15. Linear-programming-based heuristics for project capacity planning

    NARCIS (Netherlands)

    Gademann, A.J.R.M.; Schutten, J.M.J.

    2005-01-01

    Many multi-project organizations are capacity driven, which means that their operations are constrained by various scarce resources. An important planning aspect in a capacity driven multi-project organization is capacity planning. By capacity planning, we mean the problem of matching demand for

  16. Single-Shell Tank (SST) Interim Stabilization Project Plan

    International Nuclear Information System (INIS)

    VLADIMIROFF, D.T.; BOYLES, V.C.

    2000-01-01

    This project plan establishes the management framework for the conduct of the CHG Single-Shell Tank Interim Stabilization completion program. Specifically, this plan defines the mission needs and requirements; technical objectives and approach; organization structure, roles, responsibilities, and interfaces; and operational methods. This plan serves as the project executional baseline

  17. Single-shell tank interim stabilization project plan

    Energy Technology Data Exchange (ETDEWEB)

    Ross, W.E.

    1998-05-11

    This project plan establishes the management framework for conduct of the TWRS Single-Shell Tank Interim Stabilization completion program. Specifically, this plan defines the mission needs and requirements; technical objectives and approach; organizational structure, roles, responsibilities, and interfaces; and operational methods. This plan serves as the project executional baseline.

  18. Spatial policy, planning and infrastructure investment: Lessons from ...

    African Journals Online (AJOL)

    More evidence, and better evidence, an understanding of spatial trends and the underlying forces that shape them, are needed to support planning and infrastructure investment. Urban simulation platforms offer valuable tools in this regard. Findings of simulation work in three metropolitan areas (eThekwini, Nelson Mandela ...

  19. Oak woodland conservation management planning in southern CA - lessons learned

    Science.gov (United States)

    Rosi Dagit

    2015-01-01

    The California Oak Woodlands Conservation Act (AB 242 2001) established requirements for the preservation and protection of oak woodlands and trees, and allocated funding managed by the Wildlife Conservation Board. In order to qualify to use these funds, counties and cities need to adopt an oak conservation management plan. Between 2008 and 2011, a team of concerned...

  20. Community projects and democratic planning in Thailand: Lessons ...

    African Journals Online (AJOL)

    Journal of Science and Technology (Ghana). Journal Home · ABOUT THIS JOURNAL · Advanced Search · Current Issue · Archives · Journal Home > Vol 27, No 1 (2007) >. Log in or Register to get access to full text downloads.

  1. Research Notes ~ Lessons from an International e-Learning Project

    Directory of Open Access Journals (Sweden)

    Paul Breen

    2007-11-01

    Full Text Available This paper offers a critical examination of an e-learning project in the context of a Distance Education training program delivered to teacher trainers by an external university in Rwanda. In examining the successes and failures of the project, it uses a framework based on ideas promulgated by Moore (1995 and strives to provide guidance and reference for future projects in this field.

  2. National Ignition Facility project acquisition plan revision 1

    International Nuclear Information System (INIS)

    Clobes, A.R.

    1996-01-01

    The purpose of this National Ignition Facility Acquisition Plan is to describe the overall procurement strategy planned for the National Ignition Facility M Project. It was prepared for the NIP Prood Office by the NIF Procurement Manager

  3. Lessons Learned from a Third World Water and Sanitation Project.

    Science.gov (United States)

    Jenkins-McLean, Terri

    1991-01-01

    The seven-step project cycle used in a water sanitation project in Belize from 1986-89 is described. The direct involvement of community organizations, village councils, family gatherings, parent-teacher organizations, political groups, Village Health Committees, and volunteer organizations is emphasized. (CW)

  4. Cost Estimating for Decommissioning of a Plutonium Facility--Lessons Learned From The Rocky Flats Building 771 Project

    International Nuclear Information System (INIS)

    Stevens, J. L.; Titus, R.; Sanford, P. C.

    2002-01-01

    The Rocky Flats Closure Site is implementing an aggressive approach in an attempt to complete Site closure by 2006. The replanning effort to meet this goal required that the life-cycle decommissioning effort for the Site and for the major individual facilities be reexamined in detail. As part of the overall effort, the cost estimate for the Building 771 decommissioning project was revised to incorporate both actual cost data from a recently-completed similar project and detailed planning for all activities. This paper provides a brief overview of the replanning process and the original estimate, and then discusses the modifications to that estimate to reflect new data, methods, and planning rigor. It provides the new work breakdown structure and discusses the reasons for the final arrangement chosen. It follows with the process used to assign scope, cost, and schedule elements within the new structure, and development of the new code of accounts. Finally, it describes the project control methodology used to track the project, and provides lessons learned on cost tracking in the decommissioning environment

  5. Chemical and nuclear emergencies: Interchanging lessons learned from planning and accident experience

    International Nuclear Information System (INIS)

    Adler, V.; Sorensen, J.H.; Rogers, G.O.

    1989-01-01

    Because the goal of emergency preparedness for both chemical and nuclear hazards is to reduce human exposure to hazardous materials, this paper examines the interchange of lessons learned from emergency planning and accident experience in both industries. While the concerns are slightly different, sufficient similarity is found for each to draw implications from the others experience. Principally the chemical industry can learn from the dominant planning experience associated with nuclear power plants, while the nuclear industry can chiefly learn from the chemical industry's accident experience. 23 refs

  6. Double Star project - master science operations plan

    Science.gov (United States)

    Shen, C.; Liu, Z.

    2005-11-01

    For Double Star Project (DSP) exploration, the scientific operations are very important and essential for achieving its scientific objectives. Two years before the launch of the DSP satellites (TC-1 and TC-2) and during the mission operating phase, the long-term and short-term master science operations plans (MSOP) were produced. MSOP is composed of the operation schedules of all the scientific instruments, the modes and timelines of the Payload Service System on TC-1 and TC-2, and the data receiving schedules of the three ground stations. The MSOP of TC-1 and TC-2 have been generated according to the scientific objectives of DSP, the orbits of DSP, the near-Earth space environments and the coordination with Cluster, etc., so as to make full use of the exploration resources provided by DSP and to acquire as much quality scientific data as possible for the scientific communities. This paper has summarized the observation resources of DSP, the states of DSP and its evolution since the launch, the strategies and rules followed for operating the payload and utilizing the ground stations, and the production of MSOP. Until now, the generation and execution of MSOP is smooth and successful, the operating of DSP is satisfactory, and most of the scientific objectives of DSP have been fulfilled.

  7. Double Star project - master science operations plan

    Directory of Open Access Journals (Sweden)

    C. Shen

    2005-11-01

    Full Text Available For Double Star Project (DSP exploration, the scientific operations are very important and essential for achieving its scientific objectives. Two years before the launch of the DSP satellites (TC-1 and TC-2 and during the mission operating phase, the long-term and short-term master science operations plans (MSOP were produced. MSOP is composed of the operation schedules of all the scientific instruments, the modes and timelines of the Payload Service System on TC-1 and TC-2, and the data receiving schedules of the three ground stations. The MSOP of TC-1 and TC-2 have been generated according to the scientific objectives of DSP, the orbits of DSP, the near-Earth space environments and the coordination with Cluster, etc., so as to make full use of the exploration resources provided by DSP and to acquire as much quality scientific data as possible for the scientific communities. This paper has summarized the observation resources of DSP, the states of DSP and its evolution since the launch, the strategies and rules followed for operating the payload and utilizing the ground stations, and the production of MSOP. Until now, the generation and execution of MSOP is smooth and successful, the operating of DSP is satisfactory, and most of the scientific objectives of DSP have been fulfilled.

  8. Fast Flux Test Facility project plan. Revision 2

    International Nuclear Information System (INIS)

    Hulvey, R.K.

    1995-11-01

    The Fast Flux Test Facility (FFTF) Transition Project Plan, Revision 2, provides changes to the major elements and project baseline for the deactivation activities necessary to transition the FFTF to a radiologically and industrially safe shutdown condition

  9. Fast Flux Test Facility project plan. Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    Hulvey, R.K.

    1995-11-01

    The Fast Flux Test Facility (FFTF) Transition Project Plan, Revision 2, provides changes to the major elements and project baseline for the deactivation activities necessary to transition the FFTF to a radiologically and industrially safe shutdown condition.

  10. Project Management Plan (PMP) for Work Management Implementation

    International Nuclear Information System (INIS)

    SHIPLER, C.E.

    2000-01-01

    The purpose of this document is to provide a project plan for Work Management Implementation by the River Protection Project (RPP). Work Management is an information initiative to implement industry best practices by replacing some Tank Farm legacy system

  11. Integrated multi-resource planning and scheduling in engineering project

    Directory of Open Access Journals (Sweden)

    Samer Ben Issa

    2017-01-01

    Full Text Available Planning and scheduling processes in project management are carried out sequentially in prac-tice, i.e. planning project activities first without visibility of resource limitation, and then schedul-ing the project according to these pre-planned activities. This is a need to integrate these two pro-cesses. In this paper, we use Branch and Bound approach for generating all the feasible and non-feasible project schedules with/without activity splitting, and with a new criterion called “the Minimum Moments of Resources Required around X-Y axes (MMORR”, we select the best feasible project schedule to integrate plan processing and schedule processing for engineering projects. The results illustrate that this integrated approach can effectively select the best feasible project schedule among alternatives, improves the resource utilization, and shortens the project lead time.

  12. I-15 integrated corridor management system : project management plan.

    Science.gov (United States)

    2011-06-01

    The Project Management Plan (PMP) assists the San Diego ICM Team by defining a procedural framework for : management and control of the I-15 Integrated Corridor Management Demonstration Project, and development and : deployment of the ICM System. The...

  13. AMADEUS Project Deliverable 1.2: Data Management Plan

    OpenAIRE

    Ana Belén Cristobal

    2018-01-01

    This document describes the initial Data Management Plan (DMP) for AMADEUS project. It addresses Project administration data collected as part of the execution and management of a disruptive research that could be in the market in the incoming years.

  14. Lessons learnt from a primary care asthma improvement project.

    Science.gov (United States)

    Lenney, Warren; Clayton, Sadie; Gilchrist, Francis J; Price, David; Small, Iain; Smith, Judy; Sutton, Emma J

    2016-01-07

    Asthma is a very common disease that can occur at any age. In the UK and in many other countries it is mainly managed in primary care. The published evidence suggests that the key to improving diagnosis and management lies in better training and education rather than in the discovery of new medications. An asthma improvement project managed through the British Lung Foundation is attempting to do this. The project has three pilot sites: two in England supported by the Department of Health and one in Scotland supported by the Scottish Government. If the project is successful it will be rolled out to other health areas within the UK. The results of this project are not yet available. This article highlights the challenges encountered in setting up the project and may well be applicable to other areas in the UK and to other countries where similar healthcare systems exist. The encountered challenges reflect the complex nature of healthcare systems and electronic data capture in primary care. We discuss the differences between general practices in their ability and willingness to support the project, the training and education of their staff on asthma management, governance issues in relation to information technology systems, and the quality of data capture. Virtually all the challenges have now been overcome, but discussing them should ensure that others become aware of them at an early stage should they wish to undertake similar projects in the future.

  15. Lessons for fisheries management from the EU cod recovery plan

    DEFF Research Database (Denmark)

    Kraak, S.B.M.; Bailey, N.; Cardinale, M.

    2013-01-01

    Member States to 'buy back' or increase fishing effort for fleet segments engaged in cod-avoidance measures. The stipulated fishing mortality reductions have not been achieved. On the positive side, the 'buy-back' instrument has led to increased uptake of selective gear and implementation of permanent...... in targeted fisheries, although fishers experienced them as prohibiting the full uptake of other quotas. Recommendations for future plans include (i) management through catch rather than landings quotas, (ii) the internalisation of the costs of exceeding quotas, (iii) use of more selective gear types, (iv...

  16. Strategic lessons in high-level waste management planning

    Energy Technology Data Exchange (ETDEWEB)

    Chapman, Neil

    1999-07-01

    This presentation discusses some issues in the planning and execution of high-level waste (HLW) disposal. The topics are (1) Initial considerations, (2) Issues in structuring a programme, (3) Disposal concepts, (4) Geological environments, (5) Site selection and characterisation, (6) Waste transport, (7) Performance assessment methodology and application, (8) Some key issues. The options for spent fuel management can give rise to a variety of different wastes. The quantity of waste arising will affect the volume of rock required for deposition, both with respect to rock integrity and requirements for heat dissipation. A repository must not be considered in isolation from the rest of the waste management programme. The repository development plan should be supported by a schedule of activities and related funding mechanisms, implying a long-term commitment in policy terms, and should include a corresponding legal and regulatory framework. The idea that disposed waste might be retrieved by future generations for processing under new technology is discussed. Safeguards requirements on fissile material within spent fuel or any other wastes imply indefinite control. Disposal concepts include the geological environment and the engineered barrier system within it. Site selection involves several steps: regional-scale characterisation, local characterisation, hydrological studies, etc. Key issues are retrieval vs. safeguards, optimisation of repository design, reducing long programme timescales, international collaboration.

  17. Strategic lessons in high-level waste management planning

    International Nuclear Information System (INIS)

    Chapman, Neil

    1999-01-01

    This presentation discusses some issues in the planning and execution of high-level waste (HLW) disposal. The topics are (1) Initial considerations, (2) Issues in structuring a programme, (3) Disposal concepts, (4) Geological environments, (5) Site selection and characterisation, (6) Waste transport, (7) Performance assessment methodology and application, (8) Some key issues. The options for spent fuel management can give rise to a variety of different wastes. The quantity of waste arising will affect the volume of rock required for deposition, both with respect to rock integrity and requirements for heat dissipation. A repository must not be considered in isolation from the rest of the waste management programme. The repository development plan should be supported by a schedule of activities and related funding mechanisms, implying a long-term commitment in policy terms, and should include a corresponding legal and regulatory framework. The idea that disposed waste might be retrieved by future generations for processing under new technology is discussed. Safeguards requirements on fissile material within spent fuel or any other wastes imply indefinite control. Disposal concepts include the geological environment and the engineered barrier system within it. Site selection involves several steps: regional-scale characterisation, local characterisation, hydrological studies, etc. Key issues are retrieval vs. safeguards, optimisation of repository design, reducing long programme timescales, international collaboration

  18. Experiences and lessons learned for planning and supply of micronutrient powders interventions

    Science.gov (United States)

    Schauer, Claudia; Sunley, Nigel; Nyhus Dhillon, Christina; Roca, Claudia; Tapia, Gustavo; Mathema, Pragya; Walton, Shelley; Situma, Ruth; Zlotkin, Stanley; DW Klemm, Rolf

    2017-01-01

    Abstract Realistic planning for a nutrition intervention is a critical component of implementation, yet effective approaches have been poorly documented. Under the auspices of “The Micronutrient Powders Consultation: Lessons Learned for Operational Guidance,” 3 working groups were formed to summarize experiences and lessons across countries regarding micronutrient powders (MNP) interventions for young children. This paper focuses on programmatic experiences in the planning stages of an MNP intervention, encompassing assessment, enabling environment and adaptation, as well as considerations for supply. Methods included a review of published and grey literature, key informant interviews, and deliberations throughout the consultation process. We found that assessments helped justify adopting an MNP intervention, but these assessments were often limited by their narrow scope and inadequate data. Establishing coordinating bodies and integrating MNP into existing policies and programmes have helped foster an enabling environment and support programme stability. Formative research and pilots have been used to adapt MNP interventions to specific contexts, but they have been insufficient to inform scale‐up. In terms of supply, most countries have opted to procure MNP through international suppliers, but this still requires understanding and navigating the local regulatory environment at the earliest stages of an intervention. Overall, these findings indicate that although some key planning and supply activities are generally undertaken, improvements are needed to plan for effective scale‐up. Much still needs to be learned on MNP planning, and we propose a set of research questions that require further investigation. PMID:28960875

  19. Strategic Program Planning Lessons Learned In Developing The Long-Term Stewardship Science and Technology Roadmap

    Energy Technology Data Exchange (ETDEWEB)

    Dixon, B.W.; Hanson, D.J.; Matthern, G.E.

    2003-04-24

    Technology roadmapping is a strategic planning method used by companies to identify and plan the development of technologies necessary for new products. The U.S. Department of Energy's Office of Environmental Management has used this same method to refine requirements and identify knowledge and tools needed for completion of defined missions. This paper describes the process of applying roadmapping to clarify mission requirements and identify enhancing technologies for the Long-Term Stewardship (LTS) of polluted sites after site cleanup has been completed. The nature of some contamination problems is such that full cleanup is not achievable with current technologies and some residual hazards remain. LTS maintains engineered contaminant barriers and land use restriction controls, and monitors residual contaminants until they no longer pose a risk to the public or the environment. Roadmapping was used to clarify the breadth of the LTS mission, to identify capability enhancements needed to improve mission effectiveness and efficiency, and to chart out the research and development efforts to provide those enhancements. This paper is a case study of the application of roadmapping for program planning and technical risk management. Differences between the planned and actual application of the roadmapping process are presented along with lessons learned. Both the process used and lessons learned should be of interest for anyone contemplating a similar technology based planning effort.

  20. Strategic Program Planning Lessons Learned in Developing the LTS S&T Roadmap

    Energy Technology Data Exchange (ETDEWEB)

    Duane Hanson; Brent Dixon; Gretchen Matthern

    2003-07-01

    Technology roadmapping is a strategic planning method used by companies to identify and plan the development of technologies necessary for new products. The U.S. Department of Energy’s Office of Environmental Management has used this same method to refine requirements and identify knowledge and tools needed for completion of defined missions. This paper describes the process of applying roadmapping to clarify mission requirements and identify enhancing technologies for the Long-Term Stewardship (LTS) of polluted sites after site cleanup has been completed. The nature of some contamination problems is such that full cleanup is not achievable with current technologies and some residual hazards remain. LTS maintains engineered contaminant barriers and land use restriction controls, and monitors residual contaminants until they no longer pose a risk to the public or the environment. Roadmapping was used to clarify the breadth of the LTS mission, to identify capability enhancements needed to improve mission effectiveness and efficiency, and to chart out the research and development efforts to provide those enhancements. This paper is a case study of the application of roadmapping for program planning and technical risk management. Differences between the planned and actual application of the roadmapping process are presented along with lessons learned. Both the process used and lessons learned should be of interest for anyone contemplating a similar technology based planning effort.

  1. Lessons learned from the EU project T-CREST

    DEFF Research Database (Denmark)

    Schoeberl, Martin

    2016-01-01

    A three year EU project, such a T-CREST, with partners from all over Europe and with backgrounds from different domains is a challenging endeavor. Successful execution of such a project depends on more factors than simply performing excellent research. Within the three-year project T-CREST eight...... partners from academia and industry developed and evaluated a time-predictable multi-core processor with an accompanying compiler and a worst-case execution time analysis tool. The tight cooperation of the partners and the shared vision of the need of new computer architectures for future real-time systems...... enabled the successful completion of the T-CREST project. The T-CREST platform is now available, with most components in open source, to be used for future real-time systems and as a platform for further research....

  2. Sensemaking in Enterprise Resource Planning Project Deescalation: An Empirical Study

    Science.gov (United States)

    Battleson, Douglas Aloys

    2013-01-01

    Enterprise resource planning (ERP) projects, a type of complex information technology project, are very challenging and expensive to implement. Past research recognizes that escalation, defined as the commitment to a failing course of action, is common in such projects. While the factors that contribute to escalation (e.g., project conditions,…

  3. Tank waste remediation system privatization Phase 1 infrastructure, project W-519, project execution plan

    International Nuclear Information System (INIS)

    Parazin, R.J.

    1998-01-01

    This Project Execution Plan (PEP) defines the overall strategy, objectives, and contractor management requirements for the execution phase of Project W-519 (98-D403), Privatization Phase 1 Infrastructure Support, whose mission is to effect the required Hanford site infrastructure physical changes to accommodate the Privatization Contractor facilities. This plan provides the project scope, project objectives and method of performing the work scope and achieving objectives. The plan establishes the work definitions, the cost goals, schedule constraints and roles and responsibilities for project execution. The plan also defines how the project will be controlled and documented

  4. Integrated Project Teams - An Essential Element of Project Management during Project Planning and Execution - 12155

    Energy Technology Data Exchange (ETDEWEB)

    Burritt, James G.; Berkey, Edgar [Longenecker and Associates, Las Vegas, NV 89135 (United States)

    2012-07-01

    Managing complex projects requires a capable, effective project manager to be in place, who is assisted by a team of competent assistants in various relevant disciplines. This team of assistants is known as the Integrated Project Team (IPT). he IPT is composed of a multidisciplinary group of people who are collectively responsible for delivering a defined project outcome and who plan, execute, and implement over the entire life-cycle of a project, which can be a facility being constructed or a system being acquired. An ideal IPT includes empowered representatives from all functional areas involved with a project-such as engineering design, technology, manufacturing, test and evaluation, contracts, legal, logistics, and especially, the customer. Effective IPTs are an essential element of scope, cost, and schedule control for any complex, large construction project, whether funded by DOE or another organization. By recently assessing a number of major, on-going DOE waste management projects, the characteristics of high performing IPTs have been defined as well as the reasons for potential IPT failure. Project managers should use IPTs to plan and execute projects, but the IPTs must be properly constituted and the members capable and empowered. For them to be effective, the project manager must select the right team, and provide them with the training and guidance for them to be effective. IPT members must treat their IPT assignment as a primary duty, not some ancillary function. All team members must have an understanding of the factors associated with successful IPTs, and the reasons that some IPTs fail. Integrated Project Teams should be used by both government and industry. (authors)

  5. Project Plan For Remove Special Nuclear Material (SNM) from Plutonium Finishing Plant (PFP) Project

    International Nuclear Information System (INIS)

    BARTLETT, W.D.

    1999-01-01

    This plan presents the overall objectives, description, justification and planning for the Plutonium Finishing Plant (PFP) Remove SNM Materials. The intent of this plan is to describe how this project will be managed and integrated with other facility stabilization and deactivation activities. This plan supplements the overall integrated plan presented in the Plutonium Finishing Plant Integrated Project Management Plan (IPMP), HNF-3617. This project plan is the top-level definitive project management document for the PFP Remove SNM Materials project. It specifies the technical, schedule, requirements and the cost baseline to manage the execution of the Remove SNM Materials project. Any deviation to the document must be authorized through the appropriate change control process. The Remove SNM Materials project provides the necessary support and controls required for DOE-HQ, DOE-RL, BWHC, and other DOE Complex Contractors the path forward to negotiate shipped/receiver agreements, schedule shipments, and transfer material out of PFP to enable final deactivation

  6. Support of an Active Science Project by a Large Information System: Lessons for the EOS Era

    Science.gov (United States)

    Angelici, Gary L.; Skiles, J. W.; Popovici, Lidia Z.

    1993-01-01

    The ability of large information systems to support the changing data requirements of active science projects is being tested in a NASA collaborative study. This paper briefly profiles both the active science project and the large information system involved in this effort and offers some observations about the effectiveness of the project support. This is followed by lessons that are important for those participating in large information systems that need to support active science projects or that make available the valuable data produced by these projects. We learned in this work that it is difficult for a large information system focused on long term data management to satisfy the requirements of an on-going science project. For example, in order to provide the best service, it is important for all information system staff to keep focused on the needs and constraints of the scientists in the development of appropriate services. If the lessons learned in this and other science support experiences are not applied by those involved with large information systems of the EOS (Earth Observing System) era, then the final data products produced by future science projects may not be robust or of high quality, thereby making the conduct of the project science less efficacious and reducing the value of these unique suites of data for future research.

  7. Planning diabetic retinopathy services – lessons from Latin America

    Directory of Open Access Journals (Sweden)

    Pedro Gomez-Bastar

    2011-09-01

    Full Text Available The World Health Organization encourages the promotion and development of programmes for the prevention, detection, and management of diabetic retinopathy (DR. Such programmes must identify effective strategies and technology so that they can be adapted to the situation in each part of the world. Programmes must also be monitored and continuously improved.The guidelines discussed in this article were developed by experts brought together during workshops hosted by the VISION 2020 Latin America technical subcommittee on DR and technical support was provided by the Pan-American Asociation of Ophthalmology (PAAO. Although these guidelines have been developed for Latin America, we hope that the principles they contain will provide a good starting point for the planning of DR services in other low- and middle-income countries.

  8. Reducing greenhouse gas emissions: Lessons from state climate action plans

    Energy Technology Data Exchange (ETDEWEB)

    Pollak, Melisa, E-mail: mpollak@umn.edu [Humphrey Institute of Public Affairs, University of Minnesota, 301 19th Avenue South, Minneapolis, MN 55455 (United States); Meyer, Bryn, E-mail: meye1058@umn.edu [Humphrey Institute of Public Affairs, University of Minnesota, 301 19th Avenue South, Minneapolis, MN 55455 (United States); Wilson, Elizabeth, E-mail: ewilson@umn.edu [Humphrey Institute of Public Affairs, University of Minnesota, 301 19th Avenue South, Minneapolis, MN 55455 (United States)

    2011-09-15

    We examine how state-level factors affect greenhouse gas (GHG) reduction policy preference across the United States by analyzing climate action plans (CAPs) developed in 11 states and surveying the CAP advisory group members. This research offers insights into how states approach the problem of choosing emissions-abatement options that maximize benefits and minimize costs, given their unique circumstances and the constellation of interest groups with power to influence state policy. The state CAPs recommended ten popular GHG reduction strategies to accomplish approximately 90% of emissions reductions, but they recommended these popular strategies in different proportions: a strategy that is heavily relied on in one state's overall portfolio may play a negligible role in another state. This suggests that any national policy to limit GHG emissions should encompass these key strategies, but with flexibility to allow states to balance their implementation for the state's unique geographic, economic, and political circumstances. Survey results strongly support the conclusion that decisions regarding GHG reductions are influenced by the mix of actors at the table. Risk perception is associated with job type for all strategies, and physical and/or geographic factors may underlie the varying reliance on certain GHG reduction strategies across states. - Highlights: > This study analyzed climate action plans from 12 states and surveyed the advisory group members. > Ten strategies supply 90% of recommended emission reductions, but states weigh them differently. > Advisory group members perceived different opportunities and risks in the top-ten strategies. > Both geographic and socio-political factors may underlie the varying reliance on certain strategies. > Cost, business practices and consumer behavior were ranked as the top barriers to reducing emissions.

  9. Reducing greenhouse gas emissions: Lessons from state climate action plans

    International Nuclear Information System (INIS)

    Pollak, Melisa; Meyer, Bryn; Wilson, Elizabeth

    2011-01-01

    We examine how state-level factors affect greenhouse gas (GHG) reduction policy preference across the United States by analyzing climate action plans (CAPs) developed in 11 states and surveying the CAP advisory group members. This research offers insights into how states approach the problem of choosing emissions-abatement options that maximize benefits and minimize costs, given their unique circumstances and the constellation of interest groups with power to influence state policy. The state CAPs recommended ten popular GHG reduction strategies to accomplish approximately 90% of emissions reductions, but they recommended these popular strategies in different proportions: a strategy that is heavily relied on in one state's overall portfolio may play a negligible role in another state. This suggests that any national policy to limit GHG emissions should encompass these key strategies, but with flexibility to allow states to balance their implementation for the state's unique geographic, economic, and political circumstances. Survey results strongly support the conclusion that decisions regarding GHG reductions are influenced by the mix of actors at the table. Risk perception is associated with job type for all strategies, and physical and/or geographic factors may underlie the varying reliance on certain GHG reduction strategies across states. - Highlights: → This study analyzed climate action plans from 12 states and surveyed the advisory group members. → Ten strategies supply 90% of recommended emission reductions, but states weigh them differently. → Advisory group members perceived different opportunities and risks in the top-ten strategies. → Both geographic and socio-political factors may underlie the varying reliance on certain strategies. → Cost, business practices and consumer behavior were ranked as the top barriers to reducing emissions.

  10. National planning guidelines for environment ally sustainable development in Scotland and lessons learnt for Pakistan

    International Nuclear Information System (INIS)

    Qamar-ul-Islam; Anjum, G.A.; Shahzad, M.

    2005-01-01

    This piece of research work reflects the researcher's academic as well as the practical experiences of Scottish planning about the concept, issues and policy formulations. It is in the context of National Planning Policy Guidelines, originated in Scotland with particular reference to it's Fife Region. The first part reflects the general overview of Scotland followed by brief description of the region. Another part deals with the existing strategic issues in the region which are related to land and the environment notably rural planning priorities, agricultural scarce land, conservation of recreational and tourist areas, forest land potentials, landscape resources, national scenic areas, petro-chemical, industrial zones, river pollution and future land use for housing. This study has suggested National Planning Policy Guidelines to these issues. Last section deals with the lessons learnt from Scotland and appropriate application of these guidelines in case of Pakistan. The establishment of the relevant National Planning Guidelines according to our local environmental and socio-economic conditions can also play a significant role to safe guard our rural and urban landscapes and their respective environments. These broad guidelines must therefore be recommended in the broader spectrum in spatial linkage. Moreover these guidelines must therefore synthesize and articulated specifically at structure plans, master plans at district, sub district or local plans and planning processes which can lead Pakistan towards environmentally sustainable development. (author)

  11. Evaluation of regional project to strengthen national health research systems in four countries in West Africa: lessons learned.

    Science.gov (United States)

    Sombié, Issiaka; Aidam, Jude; Montorzi, Gabriela

    2017-07-12

    Since the Commission on Health Research for Development (COHRED) published its flagship report, more attention has been focused on strengthening national health research systems (NHRS). This paper evaluates the contribution of a regional project that used a participatory approach to strengthen NHRS in four post-conflict West African countries - Guinea-Bissau, Liberia, Sierra Leone and Mali. The data from the situation analysis conducted at the start of the project was compared to data from the project's final evaluation, using a hybrid conceptual framework built around four key areas identified through the analysis of existing frameworks. The four areas are governance and management, capacities, funding, and dissemination/use of research findings. The project helped improve the countries' governance and management mechanisms without strengthening the entire NHRS. In the four countries, at least one policy, plan or research agenda was developed. One country put in place a national health research ethics committee, while all four countries could adopt a research information management system. The participatory approach and support from the West African Health Organisation and COHRED were all determining factors. The lessons learned from this project show that the fragile context of these countries requires long-term engagement and that support from a regional institution is needed to address existing challenges and successfully strengthen the entire NHRS.

  12. Student projects in medicine: a lesson in science and ethics.

    Science.gov (United States)

    Edwards, Sarah J L

    2009-11-01

    Regulation of biomedical research is the subject of considerable debate in the bioethics and health policy worlds. The ethics and governance of medical student projects is becoming an increasingly important topic in its own right, especially in the U.K., where there are periodic calls to change it. My main claim is that there seems to be no good reason for treating student projects differently from projects led by qualified and more experienced scientists and hence no good grounds for changing the current system of ethics review. I first suggest that the educational objectives cannot be met without laying down standards of good science, whatever they may be. Weak science is unnecessary for educational purposes, and it is, in any case, unlikely to produce good researchers in the future. Furthermore, it is curious to want to change the system of ethics review specifically for students when it is the science that is at stake, and when the science now falls largely outside the ethics remit. I further show that ethics review is nevertheless important since students carry a new potential conflict of interests that warrants independent oversight which supervisory support does not offer. This potential conflict may become more morally troublesome the greater the risks to the subjects of the research, and students may impose greater risks on their subjects (relative to professional researchers) by virtue of being inexperienced, whatever the nature of the project. Pragmatic concerns may finally be allayed by organizing the current system more efficiently at critical times of the university calendar.

  13. Teaching Project Management On-Line: Lessons Learned from MOOCs

    Science.gov (United States)

    Falcao, Rita; Fernandes, Luis

    2016-01-01

    Creating a course for teaching project management online in a full online distance-learning environment was a challenge. Working with adult learners from different continents that want to complete a Master degree was an additional challenge. This paper describes how different MOOCs were used to learn about teaching -(meta) e-learning. MOOCs…

  14. Reflective questioning in management education : lessons from supervising thesis projects

    NARCIS (Netherlands)

    Seggelen-Damen, van I.C.M.; Romme, A.G.L.

    2014-01-01

    Reflective questioning is a critical activity in management learning and education. This article describes research on the nature of reflective questioning in groups of management students working on final MSc projects. Drawing on content analysis of recorded meetings, we identify the following key

  15. Stakeholder Management in IOS projects : Lessons from a case study

    NARCIS (Netherlands)

    Boonstra, Albert

    2006-01-01

    Implementing an effective inter-organizational system (IOS) requires significant organizational as well as technical changes. These will affect stakeholders with varying degrees of power and with varying degrees of interest in the system – yet promoters depend on them if the project is to succeed.

  16. Harvard Personal Genome Project: lessons from participatory public research

    Science.gov (United States)

    2014-01-01

    Background Since its initiation in 2005, the Harvard Personal Genome Project has enrolled thousands of volunteers interested in publicly sharing their genome, health and trait data. Because these data are highly identifiable, we use an ‘open consent’ framework that purposefully excludes promises about privacy and requires participants to demonstrate comprehension prior to enrollment. Discussion Our model of non-anonymous, public genomes has led us to a highly participatory model of researcher-participant communication and interaction. The participants, who are highly committed volunteers, self-pursue and donate research-relevant datasets, and are actively engaged in conversations with both our staff and other Personal Genome Project participants. We have quantitatively assessed these communications and donations, and report our experiences with returning research-grade whole genome data to participants. We also observe some of the community growth and discussion that has occurred related to our project. Summary We find that public non-anonymous data is valuable and leads to a participatory research model, which we encourage others to consider. The implementation of this model is greatly facilitated by web-based tools and methods and participant education. Project results are long-term proactive participant involvement and the growth of a community that benefits both researchers and participants. PMID:24713084

  17. Harvard Personal Genome Project: lessons from participatory public research.

    Science.gov (United States)

    Ball, Madeleine P; Bobe, Jason R; Chou, Michael F; Clegg, Tom; Estep, Preston W; Lunshof, Jeantine E; Vandewege, Ward; Zaranek, Alexander; Church, George M

    2014-02-28

    Since its initiation in 2005, the Harvard Personal Genome Project has enrolled thousands of volunteers interested in publicly sharing their genome, health and trait data. Because these data are highly identifiable, we use an 'open consent' framework that purposefully excludes promises about privacy and requires participants to demonstrate comprehension prior to enrollment. Our model of non-anonymous, public genomes has led us to a highly participatory model of researcher-participant communication and interaction. The participants, who are highly committed volunteers, self-pursue and donate research-relevant datasets, and are actively engaged in conversations with both our staff and other Personal Genome Project participants. We have quantitatively assessed these communications and donations, and report our experiences with returning research-grade whole genome data to participants. We also observe some of the community growth and discussion that has occurred related to our project. We find that public non-anonymous data is valuable and leads to a participatory research model, which we encourage others to consider. The implementation of this model is greatly facilitated by web-based tools and methods and participant education. Project results are long-term proactive participant involvement and the growth of a community that benefits both researchers and participants.

  18. 78 FR 63481 - Therapeutic Area Standards Initiative Project Plan; Availability

    Science.gov (United States)

    2013-10-24

    ... disadvantages of current and emerging alternatives for the exchange of regulated study data, and (2) issuing a... primary document for guiding all major aspects of FDA's multi-year initiative to develop and implement TA... is announcing the availability of the TA Project Plan. This TA Project Plan will be the primary...

  19. Automated transportation management system (ATMS) software project management plan (SPMP)

    Energy Technology Data Exchange (ETDEWEB)

    Weidert, R.S., Westinghouse Hanford

    1996-05-20

    The Automated Transportation Management System (ATMS) Software Project Management plan (SPMP) is the lead planning document governing the life cycle of the ATMS and its integration into the Transportation Information Network (TIN). This SPMP defines the project tasks, deliverables, and high level schedules involved in developing the client/server ATMS software.

  20. Inadequacies of Belgium nuclear emergency plans: lessons from the Fukushima catastrophe have not been learned

    International Nuclear Information System (INIS)

    Boilley, David; Josset, Mylene

    2015-01-01

    After having outlined that some Belgium regional authorities made some statements showing that they did not learn lessons neither from the Chernobyl catastrophe, nor from the Fukushima accident, this report aims at examining whether Belgium is well prepared to face a severe nuclear accident occurring within its borders or in neighbouring countries, whether all hypotheses have actually been taken into account, and whether existing emergency plans are realistic. After a presentation of Belgium's situation regarding nuclear plants (Belgium plants and neighbouring French plants), the report presents the content and organisation of the nuclear emergency plan for the Belgium territory at the national, provincial and municipal levels. While outlining inadequacies and weaknesses of the Belgium plan regarding the addressed issues, it discusses the main lessons learned from the Fukushima accident in terms of emergency planning areas, of population sheltering, of iodine-based prophylaxis, of population evacuation, of food supply, of tools (measurement instruments) and human resources, and of public information. In the next parts, the report addresses and discusses trans-border issues, and the commitment of stakeholders

  1. Supporting Elementary Education in-Service Teachers' Proficiency in Planning STEM-Centric Lessons

    Science.gov (United States)

    Bowers, Sharon W.

    The purpose of this study was to explore the McDaniel College Elementary STEM Instructional Leader (ESIL) pilot cohort's ability to proficiently plan lessons that incorporated the Maryland State STEM Standards of Practice (SOP), targeting integration of STEM content, inquiry learning, students' abilities to collaborate as a STEM team and students' strategic application of technology. Data collection, in the form of reviewing and analyzing study participants' lesson plans and self-reflections, was completed by three independent assessors. The researcher examined the interrater reliability among the three assessors using the Fleiss' kappa statistic. A 0.91 proportion of agreement consensus was documented among the three assessors. A test of hypothetical value was conducted using the nonparametric Wilcoxonsigned- rank Test. Interpretation of the Wilcoxon-signed-rank Test results suggest that the sample population demonstrated proficient planning abilities for the four targeted Maryland State STEM SOP. Findings from this research add to the field's knowledge of elements in the promotion of graduate coursework that leads to elementary in-service teachers' proficiency in planning STEM-centric lessons, however the findings also have broader implications for teacher education at large. The McDaniel College ESIL model could frame K-12 teacher education for both preservice and in-service teachers. The pragmatic, hybrid experience maximizes flexibility, promotes analytical thinking and self-reflection and builds communication skills. The introduction and development of inquiry and design-based learning through the 7E Learning Cycle develops the teachers' understanding of practices promoted not only within the Maryland State STEM SOP, but also within the Next Generation Science Standards. The McDaniel College ESIL model also builds upon the collective efforts of academia, a non-profit STEM research facility, and local school divisions to align efforts that may lead to

  2. Project plan remove special nuclear material from PFP project plutonium finishing plant; TOPICAL

    International Nuclear Information System (INIS)

    BARTLETT, W.D.

    1999-01-01

    This plan presents the overall objectives, description, justification and planning for the Plutonium Finishing Plant (PFP) Remove Special Nuclear Material (SNM) Materials. The intent of this plan is to describe how this project will be managed and integrated with other facility stabilization and deactivation activities. This plan supplements the overall integrated plan presented in the Plutonium Finishing Plant Integrated Project Management Plan (IPMP), HNF-3617,Rev. 0. This project plan is the top-level definitive project management document for PFP Remove SNM Materials project. It specifies the technical, schedule, requirements and the cost baselines to manage the execution of the Remove SNM Materials project. Any deviations to the document must be authorized through the appropriate change control process

  3. Project plan remove special nuclear material from PFP project plutonium finishing plant

    International Nuclear Information System (INIS)

    BARTLETT, W.D.

    1999-01-01

    This plan presents the overall objectives, description, justification and planning for the Plutonium Finishing Plant (PFP) Remove Special Nuclear Material (SNM) Materials. The intent of this plan is to describe how this project will be managed and integrated with other facility stabilization and deactivation activities. This plan supplements the overall integrated plan presented in the Plutonium Finishing Plant Integrated Project Management Plan (IPMP), HNF-3617, Rev. 0. This project plan is the top-level definitive project management document for PFP Remove SNM Materials project. It specifies the technical, schedule, requirements and the cost baselines to manage the execution of the Remove SNM Materials project. Any deviations to the document must be authorized through the appropriate change control process

  4. Finance and supply management project execution plan

    Energy Technology Data Exchange (ETDEWEB)

    BENNION, S.I.

    1999-02-10

    As a subproject of the HANDI 2000 project, the Finance and Supply Management system is intended to serve FDH and Project Hanford major subcontractor with financial processes including general ledger, project costing, budgeting, and accounts payable, and supply management process including purchasing, inventory and contracts management. Currently these functions are performed with numerous legacy information systems and suboptimized processes.

  5. Tank Waste Remediation System Characterization Project Programmatic Risk Management Plan

    International Nuclear Information System (INIS)

    Baide, D.G.; Webster, T.L.

    1995-12-01

    The TWRS Characterization Project has developed a process and plan in order to identify, manage and control the risks associated with tank waste characterization activities. The result of implementing this process is a defined list of programmatic risks (i.e. a risk management list) that are used by the Project as management tool. This concept of risk management process is a commonly used systems engineering approach which is being applied to all TWRS program and project elements. The Characterization Project risk management plan and list are subset of the overall TWRS risk management plan and list

  6. Lessons learned in process control at the Halden Reactor Project

    International Nuclear Information System (INIS)

    Kennedy, W.G.

    1989-12-01

    This report provides a list of those findings particularly relevant to regulatory authorities that can be derived from the research and development activities in computerized process control conducted at the Halden Reactor Project. The report was prepared by a staff member of the US Nuclear Regulatory Commission working at Halden. It identifies those results that may be of use to regulatory organizations in three main areas: as support for new requirements, as part of regulatory evaluations of the acceptability of new methods and techniques, and in exploratory research and development of new approaches to improve operator performance. More than 200 findings arranged in nine major categories are presented. The findings were culled from Halden Reactor Project documents, which are listed in the report

  7. Fuzzy multi-project rough-cut capacity planning

    NARCIS (Netherlands)

    Masmoudi, Malek; Hans, Elias W.; Leus, Roel; Hait, Alain; Sotskov, Yuri N.; Werner, Frank

    2014-01-01

    This chapter studies the incorporation of uncertainty into multi-project rough-cut capacity planning. We use fuzzy sets to model uncertainties, adhering to the so-called possibilistic approach. We refer to the resulting proactive planning environment as Fuzzy Rough Cut Capacity Planning (FRCCP).

  8. Gendered small-business assistance : lessons from a Swedish project

    OpenAIRE

    Tillmar, Malin

    2007-01-01

    Purpose – The purpose of this paper is to deal with the design of small-business training programs and focuses on women business owners, their real needs and the supply of adequate training. How and to what extent are client selection and support needs influenced by the gender system? Design/methodology/approach – An in-depth study of an ambitious Swedish project is reported. Interviews with the participating business-owners and advisors, combined with observations during lectures and coachin...

  9. Lessons learned at the Fernald thorium removal project

    International Nuclear Information System (INIS)

    Boyd, R.

    1990-01-01

    In 1987, IT Corporation was awarded a subcontract through Rust Engineering Co. to provide decontamination and decommissioning services at the US Department of Energy Feed Materials Production Center (FMPC) near Fernald, Ohio. The work included the removal and repackaging of approximately 8,000 cubic feet of thorium oxide from several structures, including a silo, elevated bins, bucket elevators, and the silo understructure. The removal and repackaging project was undertaken because the integrity of the containment structures was questionable. Rust and Westinghouse (the operating contractor at FMPC) also felt that the repackaging and warehousing of the thorium would reduce occupational radiation exposure to site workers. Worker safety and environmental protection being of primary importance, the removal work was performed within specially-designed radiological containment facilities. The project presented challenges which, according to Westinghouse and Rust personnel, made it one of the most hazardous projects ever attempted at Fernald. Challenges included relations between non-union and union personnel, a strike by craft labor, interactions among DOE, EPA, and Westinghouse and their impact on a fixed-price contract, the impact of hazardous waste regulations, safe operations, and the contamination-free release of materials

  10. Yakima fisheries project spring chinook supplementation monitoring plan

    International Nuclear Information System (INIS)

    Busack, C.; Pearsons, T.; Knudsen, C.; Phelps, S.; Watson, B.; Johnston, M.

    1997-08-01

    The Yakima Fisheries Project (YFP), a key element in the Northwest Power Planning Council's Fish and Wildlife Program, has been in planning for more than ten years. It was initially conceived as, and is still intended to be, a multipurpose project. Besides increasing fish production in the Yakima basin, it is also intended to yield information about supplementation that will be of value to the entire Columbia basin, and hopefully the entire region. Because of this expectation of increased knowledge resulting from the project, a large and comprehensive monitoring program has always been seen as an integral part of the project. Throughout 1996 the Monitoring Implementation and Planning Team (MIPT), an interdisciplinary group of biologists who have worked on the project for several years, worked to develop a comprehensive spring chinook monitoring plan for the project. The result is the present document

  11. Lessons from Distributing Eclipse Glasses: Planning Ahead for April 2024

    Science.gov (United States)

    Bartlett, Jennifer Lynn; Wilson, Teresa; Chizek Frouard, Malynda R.; Phlips, Alan

    2018-01-01

    In preparation for the 2017 August 21 total solar eclipse across the continental United States, a multifaceted effort encouraged safe public observation of this spectacular event. However, we experienced mixed results distributing free ISO 12312-2 compliant eclipse glasses.On the positive side, we successfully dispensed several hundred in Virginia through in-school programs about the eclipse. We created a 2017-eclipse information sheet to accompany a safe-viewing handout. To facilitate sending glasses home in student backpacks, we wrapped each pair in a double-sided flyer and sealed the bundle in an individual envelope. We also passed out glasses during evening and weekend activities at a planetarium. Religious, business, and educational groups were all excited to receive them as were co-workers, family, and friends.On the negative side, planetarium staff declined to give eclipse glasses to students without a parent due to safety and liability concerns. Then, a day camp returned 200 pairs less than 72 hours before the event for the same reasons. However, we also received several requests from groups that had waited until too late to be accommodated easily.During the week before the eclipse, demand for eclipse glasses in New York, Michigan, Indiana, Illinois, Wisconsin, Minnesota, South Dakota, Nebraska, and Missouri was less than anticipated. While many people were well prepared, the recalls and reported counterfeiting made others suspicious. Concurrently, vendors were offering their remaining stock for $1–10 each.The experiences of the 2017 total solar eclipse, both good and bad, will not completely fade before preparations for 2024 begin. We look forward enthusiastically to sharing that event with as many people as possible and hope that the overall distribution of eclipse glasses goes more smoothly.We thank the AAS for providing 1,000+ of the eclipse glasses we shared, which were donated to them by Google to promote the Eclipse Megamovie project; Rainbow

  12. Mars Rover Model Celebration: Developing Inquiry Based Lesson Plans to Teach Planetary Science In Elementary And Middle School

    Science.gov (United States)

    Bering, E. A.; Slagle, E.; Nieser, K.; Carlson, C.; Kapral, A.; Dominey, W.; Ramsey, J.; Konstantinidis, I.; James, J.; Sweaney, S.; Mendez, R.

    2012-12-01

    The recent NASA Mars Rover missions capture the imagination of children, as NASA missions have done for decades. The University of Houston is in the process of developing a prototype of a flexible program that offers children an in-depth educational experience culminating in the design and construction of their own model rover. The existing prototype program is called the Mars Rover Model Celebration. It focuses on students, teachers and parents in grades 3-8. Students will design and build a model of a Mars rover to carry out a student selected science mission on the surface of Mars. The model will be a mock-up, constructed at a minimal cost from art supplies. The students will build the models as part of a project on Mars. The students will be given design criteria for a rover and will do basic research on Mars that will determine the objectives and features of their rover. This project may be used either informally as an after school club or youth group activity or formally as part of a class studying general science, earth science, solar system astronomy or robotics, or as a multi-disciplinary unit for a gifted and talented program. The project's unique strength lies in engaging students in the process of spacecraft design and interesting them in aerospace engineering careers. The project is aimed at elementary and secondary education. Not only will these students learn about scientific fields relevant to the mission (space science, physics, geology, robotics, and more), they will gain an appreciation for how this knowledge is used to tackle complex problems. The low cost of the event makes it an ideal enrichment vehicle for low income schools. It provides activities that provide professional development to educators, curricular support resources using NASA Science Mission Directorate (SMD) content, and provides family opportunities for involvement in K-12 student learning. This paper will describe the development of a detailed set of new 5E lesson plans to

  13. Project gnome decontamination and decommissioning plan

    International Nuclear Information System (INIS)

    1979-04-01

    The document presents the operational plan for conducting the final decontamination and decommissioning work at the site of the first U.S. nuclear detonation designed specifically for peaceful purposes and the first underground event on the Plowshare Program to take place outside the Nevada Test Site. The plan includes decontamination and decommissioning procedures, radiological guidelines, and the NV concept of operations

  14. Groundwater/Vadose Zone Integration Project Management Plan

    International Nuclear Information System (INIS)

    Hughes, M. C.

    1999-01-01

    This Project Management Plan (PMP) defines the authorities, roles, and responsibilities of the US Department of Energy (DOE), Richland Operations Office (RL) and those contractor organizations participating in the Hanford Site' s Groundwater/Vadose Zone (GW/VZ) Integration Project. The PMP also describes the planning and control systems, business processes, and other management tools needed to properly and consistently conduct the Integration Project scope of work

  15. The Use of Lesson Study Combined with Content Representation in the Planning of Physics Lessons During Field Practice to Develop Pedagogical Content Knowledge

    Science.gov (United States)

    Juhler, Martin Vogt

    2016-08-01

    Recent research, both internationally and in Norway, has clearly expressed concerns about missing connections between subject-matter knowledge, pedagogical competence and real-life practice in schools. This study addresses this problem within the domain of field practice in teacher education, studying pre-service teachers' planning of a Physics lesson. Two means of intervention were introduced. The first was lesson study, which is a method for planning, carrying out and reflecting on a research lesson in detail with a learner and content-centered focus. This was used in combination with a second means, content representations, which is a systematic tool that connects overall teaching aims with pedagogical prompts. Changes in teaching were assessed through the construct of pedagogical content knowledge (PCK). A deductive coding analysis was carried out for this purpose. Transcripts of pre-service teachers' planning of a Physics lesson were coded into four main PCK categories, which were thereafter divided into 16 PCK sub-categories. The results showed that the intervention affected the pre-service teachers' potential to start developing PCK. First, they focused much more on categories concerning the learners. Second, they focused far more uniformly in all of the four main categories comprising PCK. Consequently, these differences could affect their potential to start developing PCK.

  16. Preliminary Project Execution Plan for the Remote-Handled Low-Level Waste Disposal Project

    International Nuclear Information System (INIS)

    Duncan, David

    2011-01-01

    This preliminary project execution plan (PEP) defines U.S. Department of Energy (DOE) project objectives, roles and responsibilities of project participants, project organization, and controls to effectively manage acquisition of capital funds for construction of a proposed remote-handled low-level waste (LLW) disposal facility at the Idaho National Laboratory (INL). The plan addresses the policies, requirements, and critical decision (CD) responsibilities identified in DOE Order 413.3B, 'Program and Project Management for the Acquisition of Capital Assets.' This plan is intended to be a 'living document' that will be periodically updated as the project progresses through the CD process to construction and turnover for operation.

  17. Promoting system-level learning from project-level lessons

    International Nuclear Information System (INIS)

    Jong, Amos A. de; Runhaar, Hens A.C.; Runhaar, Piety R.; Kolhoff, Arend J.; Driessen, Peter P.J.

    2012-01-01

    A growing number of low and middle income nations (LMCs) have adopted some sort of system for environmental impact assessment (EIA). However, generally many of these EIA systems are characterised by a low performance in terms of timely information dissemination, monitoring and enforcement after licencing. Donor actors (such as the World Bank) have attempted to contribute to a higher performance of EIA systems in LMCs by intervening at two levels: the project level (e.g. by providing scoping advice or EIS quality review) and the system level (e.g. by advising on EIA legislation or by capacity building). The aims of these interventions are environmental protection in concrete cases and enforcing the institutionalisation of environmental protection, respectively. Learning by actors involved is an important condition for realising these aims. A relatively underexplored form of learning concerns learning at EIA system-level via project level donor interventions. This ‘indirect’ learning potentially results in system changes that better fit the specific context(s) and hence contribute to higher performances. Our exploratory research in Ghana and the Maldives shows that thus far, ‘indirect’ learning only occurs incidentally and that donors play a modest role in promoting it. Barriers to indirect learning are related to the institutional context rather than to individual characteristics. Moreover, ‘indirect’ learning seems to flourish best in large projects where donors achieved a position of influence that they can use to evoke reflection upon system malfunctions. In order to enhance learning at all levels donors should thereby present the outcomes of the intervention elaborately (i.e. discuss the outcomes with a large audience), include practical suggestions about post-EIS activities such as monitoring procedures and enforcement options and stimulate the use of their advisory reports to generate organisational memory and ensure a better information

  18. Promoting system-level learning from project-level lessons

    Energy Technology Data Exchange (ETDEWEB)

    Jong, Amos A. de, E-mail: amosdejong@gmail.com [Innovation Management, Utrecht (Netherlands); Runhaar, Hens A.C., E-mail: h.a.c.runhaar@uu.nl [Section of Environmental Governance, Utrecht University, Utrecht (Netherlands); Runhaar, Piety R., E-mail: piety.runhaar@wur.nl [Organisational Psychology and Human Resource Development, University of Twente, Enschede (Netherlands); Kolhoff, Arend J., E-mail: Akolhoff@eia.nl [The Netherlands Commission for Environmental Assessment, Utrecht (Netherlands); Driessen, Peter P.J., E-mail: p.driessen@geo.uu.nl [Department of Innovation and Environment Sciences, Utrecht University, Utrecht (Netherlands)

    2012-02-15

    A growing number of low and middle income nations (LMCs) have adopted some sort of system for environmental impact assessment (EIA). However, generally many of these EIA systems are characterised by a low performance in terms of timely information dissemination, monitoring and enforcement after licencing. Donor actors (such as the World Bank) have attempted to contribute to a higher performance of EIA systems in LMCs by intervening at two levels: the project level (e.g. by providing scoping advice or EIS quality review) and the system level (e.g. by advising on EIA legislation or by capacity building). The aims of these interventions are environmental protection in concrete cases and enforcing the institutionalisation of environmental protection, respectively. Learning by actors involved is an important condition for realising these aims. A relatively underexplored form of learning concerns learning at EIA system-level via project level donor interventions. This 'indirect' learning potentially results in system changes that better fit the specific context(s) and hence contribute to higher performances. Our exploratory research in Ghana and the Maldives shows that thus far, 'indirect' learning only occurs incidentally and that donors play a modest role in promoting it. Barriers to indirect learning are related to the institutional context rather than to individual characteristics. Moreover, 'indirect' learning seems to flourish best in large projects where donors achieved a position of influence that they can use to evoke reflection upon system malfunctions. In order to enhance learning at all levels donors should thereby present the outcomes of the intervention elaborately (i.e. discuss the outcomes with a large audience), include practical suggestions about post-EIS activities such as monitoring procedures and enforcement options and stimulate the use of their advisory reports to generate organisational memory and ensure a better

  19. I Can Hardly Wait to See What I Am Going to Do Today: Lesson Planning Perspectives of Experienced Band Teachers

    Science.gov (United States)

    Shaw, Ryan D.

    2017-01-01

    The purpose of this study was to investigate the lesson planning practices of three experienced band teachers at the high school level. For the purposes of this study, experienced teachers were those with 25 or more years of teaching experience. Research questions were: (a) how do experienced high school band teachers plan for teaching, and (b)…

  20. ISS Solar Array Alpha Rotary Joint (SARJ) Bearing Failure and Recovery: Technical and Project Management Lessons Learned

    Science.gov (United States)

    DellaCorte, Christopher; Krantz, Timothy L.; Dube, Michael J.

    2011-01-01

    The photovoltaic solar panels on the International Space Station (ISS) track the Sun through continuous rotating motion enabled by large bearings on the main truss called solar array alpha rotary joints (SARJs). In late 2007, shortly after installation, the starboard SARJ had become hard to turn and had to be shut down after exceeding drive current safety limits. The port SARJ, of the same design, had been working well for over 2 years. An exhaustive failure investigation ensued that included multiple extravehicular activities to collect information and samples for engineering forensics, detailed structural and thermal analyses, and a careful review of the build records. The ultimate root cause was determined to be kinematic design vulnerability coupled with inadequate lubrication, and manufacturing flaws; this was corroborated through ground tests, metallurgical studies, and modeling. A highly successful recovery plan was developed and implemented that included replacing worn and damaged components in orbit and applying space-compatible grease to improve lubrication. Beyond the technical aspects, however, lie several key programmatic lessons learned. These lessons, such as running ground tests to intentional failure to experimentally verify failure modes, are reviewed and discussed so they can be applied to future projects to avoid such problems.

  1. Technical program plan, Basalt Waste Isolation Project

    International Nuclear Information System (INIS)

    1979-12-01

    The Basalt Waste Isolation Project (BWIP) program as administered by the DOE's Richland Operations Office and Rockwell Hanford Operations is described. The objectives, scope and scientific technologies are discussed. The work breakdown structure of the project includes: project management and support, systems integration, geosciences, hydrology, engineered barriers, test facility design and construction, engineering testing, repository studies, and schedules. The budget of the program including operating and capital cost control is also included

  2. Actuarial pricing of energy efficiency projects: lessons foul and fair

    International Nuclear Information System (INIS)

    Mathew, Paul; Kromer, J. Stephen; Sezgen, Osman; Meyers, Steven

    2005-01-01

    Recent market convulsions in the energy industry have generated a plethora of post-mortem analyses on a wide range of issues, including accounting rules, corporate governance, commodity markets, and energy policy. While most of these analyses have focused on business practices related to wholesale energy trading, there has been limited analysis of retail energy services, particularly energy efficiency projects. We suggest that there were several business concepts and strategies in the energy efficiency arena whose inherent value may have been masked by the larger failure of companies such as Enron. In this paper, we describe one such concept, namely, actuarial pricing of energy efficiency projects, which leverages a portfolio-based approach to risk management. First, we discuss the business drivers, contrasting this approach with conventional industry practice. We then describe the implementation of this approach, including an actuarial database, pricing curves, and a pricing process compatible with commodity pricing. We conclude with a discussion of the prospects and barriers for the further development of transparent and quantifiable risk management products for energy efficiency, a prerequisite for developing energy efficiency as a tradeable commodity. We address these issues from an experiential standpoint, drawing mostly on our experience in developing and implementing such strategies at Enron

  3. Actuarial pricing of energy efficiency projects: lessons foul and fair

    Energy Technology Data Exchange (ETDEWEB)

    Mathew, Paul E-mail: pamathew@lbl.gov; Kromer, J. Stephen; Sezgen, Osman; Meyers, Steven

    2005-07-01

    Recent market convulsions in the energy industry have generated a plethora of post-mortem analyses on a wide range of issues, including accounting rules, corporate governance, commodity markets, and energy policy. While most of these analyses have focused on business practices related to wholesale energy trading, there has been limited analysis of retail energy services, particularly energy efficiency projects. We suggest that there were several business concepts and strategies in the energy efficiency arena whose inherent value may have been masked by the larger failure of companies such as Enron. In this paper, we describe one such concept, namely, actuarial pricing of energy efficiency projects, which leverages a portfolio-based approach to risk management. First, we discuss the business drivers, contrasting this approach with conventional industry practice. We then describe the implementation of this approach, including an actuarial database, pricing curves, and a pricing process compatible with commodity pricing. We conclude with a discussion of the prospects and barriers for the further development of transparent and quantifiable risk management products for energy efficiency, a prerequisite for developing energy efficiency as a tradeable commodity. We address these issues from an experiential standpoint, drawing mostly on our experience in developing and implementing such strategies at Enron.

  4. Crowdfunding Astronomy Outreach Projects: Lessons learned from the UNAWE crowdfunding campaign

    Science.gov (United States)

    Ashton, A. J., Heenatigala, T.; Russo, P.

    2014-12-01

    In recent years, crowdfunding has become a popular method of funding new technology or entertainment products, or artistic projects. The idea is that people or projects ask for many small donations from individuals who support the proposed work, rather than a large amount from a single source. Crowdfunding is usually done via an online portal or platform which handles the financial transactions involved. The Universe Awareness (UNAWE) programme decided to undertake a Kickstarter1 crowdfunding campaign centring on the resource Universe in a Box. In this article we present the lessons learned and best practices from that campaign.

  5. A hierarchical approach to multi-project planning under uncertainty

    NARCIS (Netherlands)

    Leus, R.; Wullink, Gerhard; Hans, Elias W.; Herroelen, W.

    2004-01-01

    We survey several viewpoints on the management of the planning complexity of multi-project organisations under uncertainty. A positioning framework is proposed to distinguish between different types of project-driven organisations, which is meant to aid project management in the choice between the

  6. Phased project planning and development in anticipation of operational programs

    Science.gov (United States)

    Stroud, W. G.

    1973-01-01

    The impact of future operational status on the planning and execution of the research and development activities for major space flight projects is assessed. These projects, within NASA, are part of the Applications Program involving communications and meteorology. The NASA management approach to these projects is determined by national policies governing the responsibilities and relationships among the various government agencies and private industries.

  7. A hierarchical approach to multi-project planning under uncertainty

    NARCIS (Netherlands)

    Hans, Elias W.; Herroelen, W.; Wullink, Gerhard; Leus, R.

    2007-01-01

    We survey several viewpoints on the management of the planning complexity of multi-project organisations under uncertainty. Based on these viewpoints we propose a positioning framework to distinguish between different types of project-driven organisations. This framework is meant to aid project

  8. NNC - managing major projects and the lessons learned

    International Nuclear Information System (INIS)

    Clements, J.M.

    1989-01-01

    The formation and development of NNC Ltd (formerly National Nuclear Corporation Ltd) is explained. Its role in the building of 16 nuclear power stations in the UK is outlined. For the last two of these, Heysham-B and Torness, NNC's role as station designer and manager of the nuclear island construction and at Torness as whole site overseers is described. The NNC negotiated and placed all the major contracts for the two stations and developed a budgetary control program through which the Central and South of Scotland Electricity Generating Boards were able to participate in the allotment of budget cover for each contract and for any anticipated variations and claims. Each project had a manager and about 20 responsible engineers plus contract engineers. The government decisions to change to PWR type reactors and to privatise the electricity industry have resulted in changes and structural management in NNC Ltd. (UK)

  9. Financing of nuclear projects. Lessons from a recent experience

    International Nuclear Information System (INIS)

    Shubert, U.

    2004-01-01

    The advantages of mandating BNP Paribas as a lead bank and arranger for NPP Belene are presented. BNPP has an excellent record and credentials in Nuclear Power Plant Projects internationally and in the local energy sector and very recent experience as a lead bank for the fifth nuclear power plant in Finland. BNPP has a proven track record as Provider of rapid and efficient ECA financing in terms of: managing in parallel the number of ECA contractual relations, so as to provide 'matching opportunities' between the ECAs and leverage to improve their terms and conditions, and to harmonize them in one set of unified legal documentation. There is no cost to the Government of Bulgaria until the signing of the Facility Documentation

  10. Norway: Some lessons from a international project on CCS communication

    Energy Technology Data Exchange (ETDEWEB)

    Torvatn, Hans; Tvedt, Sturle D.; Naess, Robert

    2010-07-01

    Full text: Carbon Capture and Storage (CCS) has been part of the Norwegian debate on energy and possible solutions to the climate problems for more than a decade. One prime ministers fell from power on this issue, another first promised a 'Norwegian moon landing', then postponed the whole thing for several years. The debate has been heated several times, but little is known about what the public knows and thinks. The present paper presents some findings from six national surveys on knowledge and attitudes on CCS as part of the FENCO-ERA project 'Scrutinizing the impact of CCS communication on the general and local public (Impact of communication)'. Representative national surveys (N=61000) were conducted in six European countries: Germany, Greece, the Netherlands, Norway, Romania and the UK. Main topics covered: Sociodemographics, Attitudes towards energy issues, Media preferences, Trust, Knowledge on global warming and energy issues including CCS, initial attitudes towards CCS. The surveys also included an information experiment, testing the effect of positive and negative information on general acceptance of CCS. The paper will focus on the results from Norway using the other countries as illuminating contrasts. In Norway we will discuss four major findings: i) The majority of the Norwegian population are aware of CCS ii) There is a positive support for CCS demonstration plant, however, the support is unevenly distributed in the population iii) Information on CCS effects attitudes, however, source is less important than content iv) The project asked respondents to evaluate both risks and benefits. In Norway the effect of the benefit evaluation was stronger than the risk evaluation. Implications for CCS communication with the public as well as future research are discussed. (Author)

  11. Spent Nuclear Fuel Project Configuration Management Plan

    International Nuclear Information System (INIS)

    Reilly, M.A.

    1995-01-01

    This document is a rewrite of the draft ''C'' that was agreed to ''in principle'' by SNF Project level 2 managers on EDT 609835, dated March 1995 (not released). The implementation process philosphy was changed in keeping with the ongoing reengineering of the WHC Controlled Manuals to achieve configuration management within the SNF Project

  12. HTI retrieval demonstration project execution plan

    International Nuclear Information System (INIS)

    Ellingson, D.R.

    1997-01-01

    This plan describes the process for demonstrating the retrieval of difficult Hanford tank waste forms utilizing commercial technologies and the private sector to conduct the operations. The demonstration is to be conducted in Tank 241-C-106

  13. KCBX Quality Assurance Project Plan - October 2014

    Science.gov (United States)

    This revised plan's standards for data quality, sampling and testing methods, and task management guide the implementation of Ambient Air Monitoring by URS Corporation at the KCBX Terminals Company North and South Terminals in Chicago, Ill.

  14. KCBX Quality Assurance Project Plan - February 2014

    Science.gov (United States)

    This plan's standards for data quality, sampling and testing methods, and task management guide the implementation of Ambient Air Monitoring, by URS Corporation, at the KCBX Terminals Company North and South Terminals in Chicago, IL.

  15. Spent nuclear fuel project integrated schedule plan

    International Nuclear Information System (INIS)

    Squires, K.G.

    1995-01-01

    The Spent Nuclear Fuel Integrated Schedule Plan establishes the organizational responsibilities, rules for developing, maintain and status of the SNF integrated schedule, and an implementation plan for the integrated schedule. The mission of the SNFP on the Hanford site is to provide safe, economic, environmentally sound management of Hanford SNF in a manner which stages it to final disposition. This particularly involves K Basin fuel

  16. Spent nuclear fuel project integrated schedule plan

    Energy Technology Data Exchange (ETDEWEB)

    Squires, K.G.

    1995-03-06

    The Spent Nuclear Fuel Integrated Schedule Plan establishes the organizational responsibilities, rules for developing, maintain and status of the SNF integrated schedule, and an implementation plan for the integrated schedule. The mission of the SNFP on the Hanford site is to provide safe, economic, environmentally sound management of Hanford SNF in a manner which stages it to final disposition. This particularly involves K Basin fuel.

  17. Planning a change project in mental health nursing.

    Science.gov (United States)

    Thorpe, Rebecca

    2015-09-02

    This article outlines a plan for a change project to improve the quality of physical health care on mental health wards. The plan was designed to improve the monitoring and recording of respiratory rates on mental health wards, through the implementation of a training programme for staff. A root cause analysis was used to explore the reasons for the low incidence of respiratory rate measurement on mental health wards, and the results of this establish the basis of the proposed change project and its aims and objectives. The article describes how the project could be implemented using a change management model, as well as how its effects could be measured and evaluated. Potential barriers to the planned change project are discussed, including the human dimensions of change. The article suggests methods to overcome such barriers, discusses the value of leadership as an important factor, and examines the principles of clinical governance in the context of the planned change project.

  18. Systems Engineering Plan and project record Configuration Management Plan for the Mixed Waste Disposal Initiative

    International Nuclear Information System (INIS)

    Bryan, W.E.; Oakley, L.B.

    1993-04-01

    This document summarizes the systems engineering assessment that was performed for the Mixed Waste Disposal Initiative (MWDI) Project to determine what types of documentation are required for the success of the project. The report also identifies the documents that will make up the MWDI Project Record and describes the Configuration Management Plan describes the responsibilities and process for making changes to project documentation

  19. Resettling refugees and safeguarding their mental health: lessons learned from the Canadian Refugee Resettlement Project.

    Science.gov (United States)

    Beiser, Morton

    2009-12-01

    The Ryerson University Refugee Resettlement Project (RRP), a decade-long study of 1348 Southeast Asian refugees who came to Canada between 1979 and 1981, is one of the largest, most comprehensive and longest-lived investigations of refugee resettlement ever carried out. Knowledge gleaned from the RRP about research methodology, about the resettlement experience, about the social costs of resettling refugees, about factors that promote or hinder integration, about risk and protective factors for refugee mental health, and about the refugees' consumption of mental health and social services is summarized in the form of 18 "Lessons." The lessons are offered in order to encourage and stimulate further research, as well to suggest policy and practice innovations that could help make resettlement easier, less costly, more effective, and more humane.

  20. Building Software, Building Community: Lessons from the Ropensci Project

    Science.gov (United States)

    Boettiger, C.

    2014-12-01

    rOpenSci is a developer collective originally formed in 2011 by graduate students and post-docs from ecology and evolutionary biology to collaborate on building software tools to facilitate a more open and synthetic approach in the face of transformative rise of large and heterogeneous data. Born on the internet (the collective only began through chance discussions over social media), we have grown into a widely recognized effort that supports an ecosystem of some 45software packages, engages scores of collaborators, has taught dozens of workshops around the world, and has secured over $480,000 in grant support. As young scientists working in an academic context largely without direct support for our efforts, we have first hand experience with most of the the technical and social challenges in developing sustainable scientific software. I will summarize our experiences, the challenges we have faced, and describe our approach and success in building an effective and diverse community around the rOpenSci project.

  1. UP1 decommissioning project: initial review of lessons learned

    International Nuclear Information System (INIS)

    Fontana, Ph.; Fraize, G.; Seurat, Ph.

    2008-01-01

    The very first French electricity-generating nuclear reactors (3 gas-graphite reactors operated between 1956 and 1984) and spent fuel reprocessing plant (UP1 and ancillary facilities operated from 1958 to 1997) were located at Marcoule, in southern France. These historic facilities, together with the research labs that contributed to the development and commissioning of the processes implemented, are being decontaminated and dismantled. Other facilities near these nuclear plants will also be shut down in the next few years: the Phenix fast breeder reactor, the Celestin reactors and other ancillary units. Because the UP1 reprocessing plant and its related facilities were used for both commercial and defense activities, a dedicated group comprising three state-owned or private companies (CEA, EdF and COGEMA) was set up as the contracting authority from 1996 to 2004. Today the CEA is the contracting authority at Marcoule and has replaced AREVA NC as the site nuclear operator. AREVA acts as prime contractor for both operation of the main facilities and engineering of the dismantling projects. (authors)

  2. UP1 decommissioning project: initial review of lessons learned

    Energy Technology Data Exchange (ETDEWEB)

    Fontana, Ph.; Fraize, G. [CEA Valrho, Dir. de l' Energie Nucleaire (DEN/DPAD), 30 - Marcoule (France); Seurat, Ph. [AREVA NC, 75 - Paris (France)

    2008-07-01

    The very first French electricity-generating nuclear reactors (3 gas-graphite reactors operated between 1956 and 1984) and spent fuel reprocessing plant (UP1 and ancillary facilities operated from 1958 to 1997) were located at Marcoule, in southern France. These historic facilities, together with the research labs that contributed to the development and commissioning of the processes implemented, are being decontaminated and dismantled. Other facilities near these nuclear plants will also be shut down in the next few years: the Phenix fast breeder reactor, the Celestin reactors and other ancillary units. Because the UP1 reprocessing plant and its related facilities were used for both commercial and defense activities, a dedicated group comprising three state-owned or private companies (CEA, EdF and COGEMA) was set up as the contracting authority from 1996 to 2004. Today the CEA is the contracting authority at Marcoule and has replaced AREVA NC as the site nuclear operator. AREVA acts as prime contractor for both operation of the main facilities and engineering of the dismantling projects. (authors)

  3. A planning and scheduling system for the LHC project

    CERN Document Server

    Bachy, Gérard; Tarrant, M

    1995-01-01

    The purpose of this paper is to present modern ways to manage time, resources and progress in a large-scale project. Over the last ten years, new project management techniques and tools have appeared such as concurrent engineering, Continuous Acquisition Lifecycle Support (CALS) and Engineering Data Management System (EDMS). The world downturn of the early 90s influenced project management: increasing constraints on time and budget and more external direction on spending that, for example, requires sophisticated sub-contracting practises. However, the evolution of the software and hardware market makes project control tools cheaper and easier to use. All project groups want to have their scope of work considered as complete projects and to control them themselves. This has several consequences on project staff behaviour concerning project control, and has to be taken into account in every planning process designed today. The system described will be at the heart of the planning and scheduling procedures issue...

  4. Comprehensive Evaluation of Large Infrastructure Project Plan with ANP

    Institute of Scientific and Technical Information of China (English)

    HAN Chuan-feng; CHEN Jian-ye

    2005-01-01

    Analytic Network Process(ANP) was used in comprehensive evaluation of large infrastructure project plan. A model including social economy, ecological environment, and resources was established with ANP method. The evaluation pattern of hierarchy structure and comprehensive evaluation method for quantity and quality of large infrastructure project were put forward, which provides an effective way to evaluate the large infrastructure project plan. Quantitative analysis indicated that the internal dependence relation of hierarchy structure has influence on ranking results of plan. It is suggested that considering the internal relation can helps managers make effective decisions.

  5. Spatial policy, planning and infrastructure investment: lessons from urban simulations in three South African cities

    CSIR Research Space (South Africa)

    Coetzee, M

    2014-05-01

    Full Text Available from work conducted as part of a Department of Science and Technology (DST)-funded Integrated Planning and Development Modelling (IPDM) project, the article argues that decisions about infrastructure investment in South African metropolitan areas ought...

  6. EXPENSES FORECASTING MODEL IN UNIVERSITY PROJECTS PLANNING

    Directory of Open Access Journals (Sweden)

    Sergei A. Arustamov

    2016-11-01

    Full Text Available The paper deals with mathematical model presentation of cash flows in project funding. We describe different types of expenses linked to university project activities. Problems of project budgeting that contribute most uncertainty have been revealed. As an example of the model implementation we consider calculation of vacation allowance expenses for project participants. We define problems of forecast for funds reservation: calculation based on methodology established by the Ministry of Education and Science calculation according to the vacation schedule and prediction of the most probable amount. A stochastic model for vacation allowance expenses has been developed. We have proposed methods and solution of the problems that increase the accuracy of forecasting for funds reservation based on 2015 data.

  7. The Columbia River Protection Supplemental Technologies Quality Assurance Project Plan

    Energy Technology Data Exchange (ETDEWEB)

    Fix, N. J.

    2008-03-12

    Pacific Northwest National Laboratory researchers are working on the Columbia River Protection Supplemental Technologies Project. This project is a U. S. Department of Energy, Office of Environmental Management-funded initiative designed to develop new methods, strategies, and technologies for characterizing, modeling, remediating, and monitoring soils and groundwater contaminated with metals, radionuclides, and chlorinated organics. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the Technologies Project staff.

  8. Managing the Moon Program: Lessons Learned from Project Apollo

    Science.gov (United States)

    1999-01-01

    There have been many detailed historical studies of the process of deciding on and executing the Apollo lunar landing during the 1960s and early 1970s. From the announcement of President John F Kennedy on May 25, 1961, of his decision to land an American on the Moon by the end of the decade, through the first lunar landing on July 20, 1969, on to the last of six successful Moon landings with Apollo 17 in December 1972, NASA carried out Project Apollo with enthusiasm and aplomb. While there have been many studies recounting the history of Apollo, at the time of the 30th anniversary of the first lunar landing by Apollo 11, it seems appropriate to revisit the process of large-scale technological management as it related to the lunar mission. Consequently, the NASA History Office has chosen to publish this monograph containing the recollections of key partcipants in the management process. The collective oral history presented here was recorded in 1989 at the Johnson Space Center's Gilruth Recreation Center in Houston, Texas. It includes the recollections of key participants in Apollo's administration, addressing issues such as communication between field centers, the prioritization of technological goals, and the delegation of responsibility. The following people participated: George E. Muller, Owen W. Morris, Maxime A. Faget, Robert R. Gilruth, Christopher C. Kraft, and Howard W. (Bill) Tindall. The valuable perspectives of these individuals deepen and expand our understanding of this important historical event. This is the 14th in a series of special studies prepared by the NASA History Office. The Monographs in Aerospace History series is designed to provide a wide variety of investigations relative to the history of aeronautics and space. These publications are intended to be tightly focused in terms of subject, relatively short in length, and reproduced in an inexpensive format to allow timely and broad dissemination to researchers in aerospace history.

  9. Diagnostic planning in JT-60 project

    International Nuclear Information System (INIS)

    Matoba, Tohru; Suzuki, Yasuo; Funahashi, Akimasa; Itagaki, Tokiyoshi

    1977-08-01

    The diagnostic plans of JT-60 were made along with design of the main machine. Basic requirements of the diagnostic program are (1) multiple measurement of respective plasma parameters, (2) efficient usage of the discharge, (3) capable data acquisition system, (4) high reliability of the diagnostic equipments, and (5) systematic development of new diagnostic techniques. Dimensions of the diagnostic ports were determined in detailed design of the vacuum vessel, anticipating the possible diagnostic methods. The proposed diagnostic systems and the plans are shown in table and figures respectively. Problems in the diagnostics are also described. (auth.)

  10. Quality assurance program plan fuel supply shutdown project

    International Nuclear Information System (INIS)

    Metcalf, I.L.

    1998-01-01

    This Quality Assurance Program plan (QAPP) describes how the Fuel Supply Shutdown (FSS) project organization implements the quality assurance requirements of HNF-MP-599, Project Hanford Quality Assurance Program Description (QAPD) and the B and W Hanford Company Quality Assurance Program Plan (QAPP), FSP-MP-004. The QAPP applies to facility structures, systems, and components and to activities (e.g., design, procurement, testing, operations, maintenance, etc.) that could affect structures, systems, and components. This QAPP also provides a roadmap of applicable Project Hanford Policies and Procedures (PHPP) which may be utilized by the FSS project organization to implement the requirements of this QAPP

  11. You plan, you test and then it happens: Lessons learned from the Schneider warehouse tornado recovery.

    Science.gov (United States)

    Marotz, William T

    2017-12-01

    This paper is about the experience gained and lessons learned while dealing with the long-term recovery of Schneider's Port Logistics Division following extensive damage to three warehouse/ office facilities in Savannah, GA on 25th April, 2015. This paper will provide insight into how the initial assessments were handled, how the skill sets needed by the response teams were determined, and what further actions were triggered as more detailed information was received and assessed by the leadership team. This paper will also provide information as to how closely the company followed its existing contingency and disaster recovery plans, as well as where those plans fell short and where it was necessary to make adjustments as the recovery progressed.

  12. Planning adaptation for food and farming: lessons from 40 year's research

    Energy Technology Data Exchange (ETDEWEB)

    Reid, Hannah; Chambwera, Muyeye; Murray, Laurel

    2012-05-15

    Local farmers and pastoralists in poor countries have long coped with droughts, floods and variable rainfall patterns. This first-hand experience is invaluable for those working on climate change adaptation policies, but how do we access it? The International Institute for Environment and Development (IIED) has 40 years' experience working alongside vulnerable communities to help inform regional, national and global policies. Our research has shown that measures to increase climate change resilience must view food, energy, water and waste management systems as interconnected and mutually dependent. This holistic approach must also be applied to economic analysis on adaptation planning. Similarly, it is vital to use traditional knowledge and management skills, which can further support adaptation planning. Taking these lessons into account, we can then address the emerging policy challenges that we face.

  13. Outline of Fukushima nuclear accident and future action. Lessons learned from accident and countermeasure plan

    International Nuclear Information System (INIS)

    Fukuda, Toshihiko

    2012-01-01

    Fukushima nuclear accident was caused by loss of all AC power sources (SBO) and loss of ultimate heat sink (LUHS) at Fukushima Daiichi Nuclear Power Plants (NPPs) hit by the Great East Japan Earthquake. This article reviewed outline of Fukushima nuclear accident progression when on year had passed since and referred to lessons learned from accident and countermeasure plan to prevent severe accident in SBO and LUHS events by earthquake and tsunami as future action. This countermeasure would be taken to (1) prevent serious flooding in case a tsunami overwhelms the breakwater, with improving water tightness of rooms for emergency diesel generator, batteries and power centers, (2) enhance emergency power supply and cooling function with mobile electricity generator, high pressure fire pump car and alternate water supply source, (3) mitigate environmental effects caused by core damage with installing containment filtered venting, and (4) enforce emergency preparedness in case of severe accident. Definite countermeasure plan for Kashiwazaki-Kariwa NPPs was enumerated. (T. Tanaka)

  14. Marketing plan : Dallas Integrated Corridor Management (ICM) demonstration project.

    Science.gov (United States)

    2014-01-01

    North Central Texas is a unique region in terms of its combination of recent, current and projected size, growth rate, ethnic diversity, and transportation profile specifically in relation to congestion. This document summarizes a plan to market ...

  15. 7 CFR 1209.40 - Programs, plans, and projects.

    Science.gov (United States)

    2010-01-01

    ..., plan, or project, no reference to a brand name, trade name, or State or regional identification of any... SERVICE (MARKETING AGREEMENTS AND ORDERS; MISCELLANEOUS COMMODITIES), DEPARTMENT OF AGRICULTURE MUSHROOM...

  16. Project management plan for exploratory shaft at Yucca Mountain

    International Nuclear Information System (INIS)

    1983-08-01

    This Project Management Plan (PMP) provides the basic guidance and describes the organizational structure and procedures for the design, construction, and testing of a large-diameter Exploratory Shaft (ES) in tuffaceous media as a major element within the Nevada Nuclear Waste Storage Investigations (NNWSI) project, which is a part of the National Waste Terminal Storage (NWTS) Program, US Department of Energy (DOE). The PMP encompasses activities identified as construction phase and in situ phase testing to be conducted from the ES through September 30, 1986. Specific topics addressed are the ES project objectives, the management organization and responsibilities, functional support requirements, work plan (including quality assurance aspects), work breakdown structure, milestone schedule, logic diagram, performance criteria, cost estimates, management control systems, procurement plan, test plan, and environmental, health and safety plans

  17. Designing a lessons learned model to improve the success of new product development in project oriented organizations

    Directory of Open Access Journals (Sweden)

    Ahmad

    2016-12-01

    Full Text Available Nowadays, project-based organizations need to utilize intellectual capital and knowledge to become leader in their business activities. The new approach to use knowledge based skills from one side and development of the new complicated products from the other side have increased the need for designing a lessons learned model. The purpose of this paper is to design a lessons learned model to improve the success of new product development for project oriented organizations. The study designs a questionnaire in Likert scale and distributes it among 56 experts who were well informed about various techniques of new product development and lessons learned. Cronbach alphas for all components of the survey were well above the desirable level. The results of the survey have indicated that there were positive and meaningful relationships between lessons learned components and the success of the new product development.

  18. Project management plan : Dallas Integrated Corridor Management (ICM) demonstration project.

    Science.gov (United States)

    2010-12-01

    The Dallas Integrated Corridor Management System Demonstration Project is a multi-agency, de-centralized operation which will utilize a set of regional systems to integrate the operations of the corridor. The purpose of the Dallas ICM System is to im...

  19. Tailoring Small IT Projects in the Project Planning Phase

    Science.gov (United States)

    Mulhearn, Michael F.

    2011-01-01

    Project management (PM) and systems engineering (SE) are essential skills in information technology (IT). There is an abundance of information available detailing the comprehensive bodies of knowledge, standards, and best practices. Despite the volume of information, there is surprisingly little information about how to tailor PM and SE tasks for…

  20. Guidance and Control Software Project Data - Volume 1: Planning Documents

    Science.gov (United States)

    Hayhurst, Kelly J. (Editor)

    2008-01-01

    The Guidance and Control Software (GCS) project was the last in a series of software reliability studies conducted at Langley Research Center between 1977 and 1994. The technical results of the GCS project were recorded after the experiment was completed. Some of the support documentation produced as part of the experiment, however, is serving an unexpected role far beyond its original project context. Some of the software used as part of the GCS project was developed to conform to the RTCA/DO-178B software standard, "Software Considerations in Airborne Systems and Equipment Certification," used in the civil aviation industry. That standard requires extensive documentation throughout the software development life cycle, including plans, software requirements, design and source code, verification cases and results, and configuration management and quality control data. The project documentation that includes this information is open for public scrutiny without the legal or safety implications associated with comparable data from an avionics manufacturer. This public availability has afforded an opportunity to use the GCS project documents for DO-178B training. This report provides a brief overview of the GCS project, describes the 4-volume set of documents and the role they are playing in training, and includes the planning documents from the GCS project. Volume 1 contains five appendices: A. Plan for Software Aspects of Certification for the Guidance and Control Software Project; B. Software Development Standards for the Guidance and Control Software Project; C. Software Verification Plan for the Guidance and Control Software Project; D. Software Configuration Management Plan for the Guidance and Control Software Project; and E. Software Quality Assurance Activities.

  1. Spent Nuclear Fuel (SNF) Project Execution Plan

    International Nuclear Information System (INIS)

    LEROY, P.G.

    2000-01-01

    The Spent Nuclear Fuel (SNF) Project supports the Hanford Site Mission to cleanup the Site by providing safe, economic, environmentally sound management of Site spent nuclear fuel in a manner that reduces hazards by staging it to interim onsite storage and deactivates the 100 K Area facilities

  2. Spent Nuclear Fuel (SNF) Project Execution Plan

    Energy Technology Data Exchange (ETDEWEB)

    LEROY, P.G.

    2000-11-03

    The Spent Nuclear Fuel (SNF) Project supports the Hanford Site Mission to cleanup the Site by providing safe, economic, environmentally sound management of Site spent nuclear fuel in a manner that reduces hazards by staging it to interim onsite storage and deactivates the 100 K Area facilities.

  3. Analysis of the CNSC Staffs Action Plan to Reflect Lessons Learned from Fukushima Accident

    Energy Technology Data Exchange (ETDEWEB)

    Ahn, Sangkyu; Yune, Young Gill; Ahn, Hyungjoon; Kim, Byungjik; Lee, Jinho [Korea Institute of Nuclear Safety, Daejeon (Korea, Republic of)

    2014-05-15

    On September 30, 2011, the Task Force completed its review and presented the public with the findings and recommendations in the CNSC Fukushima Task Force Report. The Task Force made 13 recommendations to further enhance the safety of nuclear power plants in Canada. After that, the CNSC established the CNSC Staffs Action Plan based on the Fukushima Task Force's recommendations. In Canada, 19 nuclear power reactor units are currently producing electric power, and all of them are pressurized heavy water-reactor (PHWR) types. Also, considering 2 power reactor units in Korea, Wolsung unit 1 and 2, are the same reactor type, the analysis of the CNSC Staffs Action Plan will be of benefit to determining recommendations of Korea to address lessons learned from the Fukushima Daiichi nuclear power plant. Therefore, the CNSC Staffs Action Plan was introduced and analyzed in this study. From the results of the above analysis, it is recognized that the strengthening of defense in depth, emergency preparedness and the regulatory oversight of nuclear power plants in Canada were emphasized and much similar to practices of other countries. Public consultation process establishing the CNSC Staffs action plan has been carried out several times, in order to ensure regulatory transparency, by the CNSC staffs, and this is comparable with other countries. It is expected that the detail analysis results of the above plan will be helpful to enhance the safety of domestic operating nuclear power plants.

  4. Lessons Learned from Client Projects in an Undergraduate Project Management Course

    Science.gov (United States)

    Pollard, Carol E.

    2012-01-01

    This work proposes that a subtle combination of three learning methods offering "just in time" project management knowledge, coupled with hands-on project management experience can be particularly effective in producing project management students with employable skills. Students were required to apply formal project management knowledge to gain…

  5. Non-Profit/Higher Education Project Management Series: The Project Plan

    Science.gov (United States)

    Burgher, Karl E.; Snyder, Michael

    2012-01-01

    This is the second installment of the AACRAO management series focusing on project management in the academy. In this article, the authors focus on white papers (often called charters, briefs, or fact sheets) and their partner, the work plan. The work plan is a detailed document that defines each aspect of a project. It is often preceded by a…

  6. Research-Based Development of a Lesson Plan on Shower Gels and Musk Fragrances Following a Socio-Critical and Problem-Oriented Approach to Chemistry Teaching

    Science.gov (United States)

    Marks, Ralf; Eilks, Ingo

    2010-01-01

    A case is described of the development of a lesson plan for 10th grade (age range 15-16) chemistry classes on the chemistry of shower gels. The lesson plan follows a socio-critical and problem-oriented approach to chemistry teaching. This means that, aside from learning about the basic chemistry of the components making up modern shower gels in…

  7. Identifying different methods for creating knowledge from lessons learned in project oriented organizations

    Directory of Open Access Journals (Sweden)

    Ahmad Norang

    2016-01-01

    Full Text Available Nowadays, the increase in competition has increased the relative importance of innovation for most firms and many managers believe a good innovation must be knowledge oriented. This paper has tried to determine different methods for creating knowledge in project oriented organizations. The study designs a questionnaire in Likert scale and distributes it among 32 experts who were well informed about different methods of knowledge creation and lessons learned. Cronbach alphas for all components of the survey were well above the desirable level. The study has detected 11 methods for knowledge creation and lessons learned. In terms of preliminary assessment, business transactions has received the highest impact while knowledge team has received the highest effect in terms of necessary assessment. The results of this survey have indicated that although there are several methods for detecting knowledge within organizations, in most cases, it is not easy to gain value added knowledge within an organization, quickly. The people who participated in our survey have indicated that organizational commitment, brainstorming, Delphi and storytelling also have played important role for creation of knowledge. The results have also shown that brainstorming, knowledge brokers, map knowledge and work experience were easier to use for knowledge creation and lessons learned compared with other forms of knowledge creation.

  8. 7 CFR 1250.314 - Plans and projects.

    Science.gov (United States)

    2010-01-01

    ... research, consumer and producer education, advertising, marketing, product development, and promotion plans... 7 Agriculture 10 2010-01-01 2010-01-01 false Plans and projects. 1250.314 Section 1250.314 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (MARKETING...

  9. Columbia River Channel Improvement Project Rock Removal Blasting: Monitoring Plan

    Energy Technology Data Exchange (ETDEWEB)

    Carlson, Thomas J.; Johnson, Gary E.

    2010-01-29

    This document provides a monitoring plan to evaluate take as outlined in the National Marine Fisheries Service 2002 Biological Opinion for underwater blasting to remove rock from the navigation channel for the Columbia River Channel Improvement Project. The plan was prepared by the Pacific Northwest National Laboratory (PNNL) for the U.S. Army Corps of Engineers (USACE), Portland District.

  10. Designing Innovative Lessons Plans to Support the Next Generation Science Standards (NGSS)

    Science.gov (United States)

    Passow, M. J.

    2013-12-01

    The Next Generation Science Standards (NGSS) issued earlier in 2013 provide the opportunity to enhance pre-college curricula through a new focus on the ';Big Ideas' in Science, more attention to reading and writing skills needed for college and career readiness, and incorporation of engineering and technology. We introduce a set of lesson plans about scientific ocean drilling which can serve as a exemplars for developing curricula to meet NGSS approaches. Designed for middle and high school students, these can also be utilized in undergraduate courses. Development of these lessons was supported through a grant from the Deep Earth Academy of the Consortium for Ocean Leadership. They will be disseminated through websites of the Deep Earth Academy (http://www.oceanleadership.org/education/deep-earth-academy/) and Earth2Class Workshops for Teachers (http://www.earth2class.org), as well as through workshops at science education conferences sponsored by the National Earth Science Teachers Association (www.nestanet.org) and other organizations. Topics include 'Downhole Logging,' 'Age of the Ocean Floors,' 'Tales of the Resolution,' and 'Continental Shelf Sediments and Climate Change Patterns.' 'Downhole Logging' focuses on the engineering and technology utilized to obtain more information about sediments and rocks cored by the JOIDES Resolution scientific drilling vessel. 'Age of the Ocean Floor' incorporates the GeoMap App visualization tools (http://www.geomapapp.org/) to compare sea bottom materials in various parts of the world. 'Tales of the Resolution' is a series of ';graphic novels' created to describe the scientific discoveries, refitting of the JOIDES Resolution, and variety of careers available in the marine sciences (http://www.ldeo.columbia.edu/BRG/outreach/media/tales/). The fourth lesson focuses on discoveries made during Integrated Ocean Drilling Program Expedition 313, which investigated patterns in the sediments beneath the continental shelf off New

  11. Project Rulison: post-shot plans and evaluations

    Energy Technology Data Exchange (ETDEWEB)

    1969-12-01

    Project Rulison post-shot plans and evaluations are discussed and include physical characteristics of the Rulison cavity; pressure and temperature expected in the cavity; amount, nature, and distribution of radioactivity in the cavity; reentry plan; radioactive species which may be encountered during reentry; public safety considerations arising from release of radioactivity; procedures to assure public safety; and the radiological safety plan. Maximum hypothetical accidents and ecological considerations are discussed in the appendices.

  12. Lessons Learned from the On-Site Disposal Facility at Fernald Closure Project

    International Nuclear Information System (INIS)

    Kumthekar, U.A.; Chiou, J.D.

    2006-01-01

    The On-Site Disposal Facility (OSDF) at the U.S. Department of Energy's (DOE) Fernald Closure Project near Cincinnati, Ohio is an engineered above-grade waste disposal facility being constructed to permanently store low level radioactive waste (LLRW) and treated mixed LLRW generated during Decommissioning and Demolition (D and D) and soil remediation performed in order to achieve the final land use goal at the site. The OSDF is engineered to store 2.93 million cubic yards of waste derived from the remediation activities. The OSDF is intended to isolate its LLRW from the environment for at least 200 years and for up to 1,000 years to the extent practicable and achievable. Construction of the OSDF started in 1997 and waste placement activities will complete by the middle of April 2006 with the final cover (cap) placement over the last open cell by the end of Spring 2006. An on-site disposal alternative is considered critical to the success of many large-scale DOE remediation projects throughout the United States. However, for various reasons this cost effective alternative is not readily available in many cases. Over the last ten years Fluor Fernald Inc. has cumulated many valuable lessons learned through the complex engineering, construction, operation, and closure processes of the OSDF. Also in the last several years representatives from other DOE sites, State agencies, as well as foreign government agencies have visited the Fernald site to look for proven experiences and practices, which may be adapted for their sites. This paper present a summary of the major issues and lessons leaned at the Fernald site related to engineering, construction, operation, and closure processes for the disposal of remediation waste. The purpose of this paper is to share lessons learned and to benefit other projects considering or operating similar on-site disposal facilities from our successful experiences. (authors)

  13. Advanced Hybrid Particulate Collector Project Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Miller, S.J.

    1995-11-01

    As the consumption of energy increases, its impact on ambient air quality has become a significant concern. Recent studies indicate that fine particles from coal combustion cause health problems as well as atmospheric visibility impairment. These problems are further compounded by the concentration of hazardous trace elements such as mercury, cadmium, selenium, and arsenic in fine particles. Therefore, a current need exists to develop superior, but economical, methods to control emissions of fine particles. Since most of the toxic metals present in coal will be in particulate form, a high level of fine- particle collection appears to be the best method of overall air toxics control. However, over 50% of mercury and a portion of selenium emissions are in vapor form and cannot be collected in particulate control devices. Therefore, this project will focus on developing technology not only to provide ultrahigh collection efficiency of particulate air toxic emissions, but also to capture vapor- phase trace metals such as mercury and selenium. Currently, the primary state-of-the-art technologies for particulate control are fabric filters (baghouses) and electrostatic precipitators (ESPs). However, they both have limitations that prevent them from achieving ultrahigh collection of fine particulate matter and vapor-phase trace metals. The objective of this project is to develop a highly reliable advanced hybrid particulate collector (AHPC) that can provide > 99.99 % particulate collection efficiency for all particle sizes between 0.01 and 50 14m, is applicable for use with all U.S. coals, and is cost-0443competitive with existing technologies. Phase I of the project is organized into three tasks: Task I - Project Management, Reporting, and Subcontract Consulting Task 2 - Modeling, Design, and Construction of 200-acfm AHPC Model Task 3 - Experimental Testing and Subcontract Consulting

  14. Amish-Initiated Burn Care Project: Case Report and Lessons Learned in Participatory Research.

    Science.gov (United States)

    Hess, Rosanna F

    2017-03-01

    This case report describes the phases of an Amish Burn Care Project and the lessons learned throughout the process. Data sources to construct the case report included participant observation, interviews, archival documents, and a focus group. The narrative is organized into five phases of a participatory research approach: engagement, formalization, mobilization, maintenance, and expansion. Community-initiated research led to legitimate change, working together for change took time, team members grew in mutual trust and respect for each other, cultural humility brought personal and professional growth, and capacity building took place through mutually supported efforts.

  15. Design, Implementation, and Lessons Learned from a Digital Storytelling Project in an Undergraduate Health Promotion Theory Course

    Science.gov (United States)

    Rimando, Marylen; Smalley, K. Bryant; Warren, Jacob C.

    2015-01-01

    This article describes the design, implementation and lessons learned from a digital storytelling project in a health promotion theory course. From 2011-2012, 195 health promotion majors completed a digital storytelling project at a Midwestern university. The instructor observed students' understanding of theories and models. This article adds to…

  16. Planning risk communication for UMTRA project groundwater restoration

    Energy Technology Data Exchange (ETDEWEB)

    Hundertmark, Charles [Jacobs Engineering Group Inc. and University of Phoenix (United States); Hoopes, Jack [Jacobs Engineering Group Inc. (United States); Flowers, Len [Roy F. Weston Company (United States); Jackson, David G [U.S. Department of Energy (United States)

    1992-07-01

    The U.S. Department of Energy's (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project is entering a new phase in which groundwater contamination will become a growing focus as surface remedial action draws toward completion. Planning for risk communication associated with the groundwater project will be a major factor in the successful initiation of the program. (author)

  17. Projects of Strategic Action Plan of S&T Innovation

    Institute of Scientific and Technical Information of China (English)

    2002-01-01

    @@ In July 2001, CAS decided to shift the focus of the current Knowledge Innovation Program (KIP) onto research projects designed to meet the country's strategic needs, and Iaunched the strategic action plan of innovation (SAPI). Under the SAPI, CAS organized the implementation of seven major projects in 2001.The followings are their profiles.

  18. QUEST2: Release 1: Project plan deliverable set

    International Nuclear Information System (INIS)

    Braaten, F.D.

    1995-01-01

    This Project Management Plan combines the project management deliverables from the P+ methodology which are applicable to Release 1 of the QUEST2 work. This consolidation reflects discussions with WHC QA regarding an appropriate method for ensuring that P+ deliverables fulfill the intent of WHC-CM-3-10 and QR-19

  19. Planning risk communication for UMTRA project groundwater restoration

    International Nuclear Information System (INIS)

    Hundertmark, Charles; Hoopes, Jack; Flowers, Len; Jackson, David G.

    1992-01-01

    The U.S. Department of Energy's (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project is entering a new phase in which groundwater contamination will become a growing focus as surface remedial action draws toward completion. Planning for risk communication associated with the groundwater project will be a major factor in the successful initiation of the program. (author)

  20. Reduction of radiation area project plan

    International Nuclear Information System (INIS)

    1979-08-01

    This plan deals with the overall reduction of outdoor surface radiation areas under Rockwell's jurisdiction. Four basic alternatives are identified which will reduce and/or stabilize radiation areas until long-term disposal decisions are made: (1) continued routine surveillance and maintenance; (2) reduction or elimination of effluent discharges; (3) improved site stabilization; and (4) site removal. The four major transport mechanisms at Hanford that are the primary forces for contamination spread are identified as wind, animal transport, concentration and dispersal by plants, and transport resulting from human activities

  1. Project management plan for the 105-C Reactor interim safe storage project. Revision 1

    International Nuclear Information System (INIS)

    Miller, R.L.

    1997-01-01

    In 1942, the Hanford Site was commissioned by the US Government to produce plutonium. Between 1942 and 1955, eight water-cooled, graphite-moderated reactors were constructed along the Columbia River at the Hanford Site to support the production of plutonium. The reactors were deactivated from 1964 to 1971 and declared surplus. The Surplus Production Reactor Decommissioning Project (BHI 1994b) will decommission these reactors and has selected the 105-C Reactor to be used as a demonstration project for interim safe storage at the present location and final disposition of the entire reactor core in the 200 West Area. This project will result in lower costs, accelerated schedules, reduced worker exposure, and provide direct benefit to the US Department of Energy for decommissioning projects complex wide. This project sets forth plans, organizational responsibilities, control systems, and procedures to manage the execution of the Project Management Plan for the 105-C Reactor Interim Safe Storage Project (Project Management Plan) activities to meet programmatic requirements within authorized funding and approved schedules. The Project Management Plan is organized following the guidelines provided by US Department of Energy Order 4700.1, Project Management System and the Richland Environmental Restoration Project Plan (DOE-RL 1992b)

  2. Pre-Project planning of Capital Facilities at NASA

    OpenAIRE

    Barrow, Benjamin John

    1999-01-01

    This thesis details the development of a NASA specific Project Definition Rating Index (PDRI) tool. This tool is to be used as a checklist for determining the necessary steps to follow in defining project scope and as a means to monitor progress and assess scope definition completeness at various stages during the NASA Pre-Project Planning process. This thesis also describes and identifies specific points in the NASA Capital Facility Programming Cycle for the performance of PDRI assessments ...

  3. Spent Nuclear Fuel project systems engineering management plan

    International Nuclear Information System (INIS)

    Womack, J.C.

    1995-01-01

    The purpose of the WHC Systems Engineering Management Plan (SEMP) is to describe the systems engineering approach and methods that will be integrated with established WHC engineering practices to enhance the WHC engineering management of the SNF Project. The scope of the SEMP encompasses the efforts needed to manage the WHC implementation of systems engineering on the SNF Project. This implementation applies to, and is tailored to the needs of the SNF project and all its subprojects, including all current and future subprojects

  4. Uranium mill tailings remedial action project real estate management plan

    International Nuclear Information System (INIS)

    1994-09-01

    This plan summarizes the real estate requirements of the US Department of Energy's (DOE) Uranium Mill Tailings Action (UMTRA) Project, identifies the roles and responsibilities of project participants involved in real estate activities, and describes the approaches used for completing these requirements. This document is intended to serve as a practical guide for all project participants. It is intended to be consistent with all formal agreements, but if a conflict is identified, the formal agreements will take precedence

  5. Uranium mill tailings remedial action project real estate management plan

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-01

    This plan summarizes the real estate requirements of the US Department of Energy`s (DOE) Uranium Mill Tailings Action (UMTRA) Project, identifies the roles and responsibilities of project participants involved in real estate activities, and describes the approaches used for completing these requirements. This document is intended to serve as a practical guide for all project participants. It is intended to be consistent with all formal agreements, but if a conflict is identified, the formal agreements will take precedence.

  6. ERD UMTRA Project quality assurance program plan, Revision 7

    International Nuclear Information System (INIS)

    1995-09-01

    This document is the revised Quality Assurance Program Plan (QAPP) dated September, 1995 for the Environmental Restoration Division (ERD) Uranium Mill Tailings Remedial Action Project (UMTRA). Quality Assurance requirements for the ERD UMTRA Project are based on the criteria outlined in DOE Order 5700.6C or applicable sections of 10 CFR 830.120. QA requirements contained in this QAPP shall apply to all personnel, processes, and activities, including planning, scheduling, and cost control, performed by the ERD UMTRA Project and its contractors

  7. Evaluation of Urban Planning Projects Criteria Using Fuzzy AHP Technique

    Directory of Open Access Journals (Sweden)

    Walid Mustafa Kamas

    2017-05-01

    Full Text Available In this research, Fuzzy Analytic Hierarchy Process technique is applied (Fuzzy AHP which is one of multi-criteria decision making techniques to evaluate the criteria for urban planning projects, the project of developing master plan of Al-Muqdadiyah city to 2035 has been chosen as a case study. The researcher prepared a list of criteria in addition to the authorized departments criteria and previous researches in order to choose optimized master plan according to these criteria. This research aims at employing the foundations of (Fuzzy AHP technique in evaluating urban planning criteria precisely and flexible. The results of the data analysis to the individuals of the sample who are specialists, in this aspect. The land use criteria are more important than the rest of the criteria in these projects, where it received the relative importance with percentile (42.1 %.

  8. Siberian Chemical Combine laboratory project work plan, fiscal year 1999

    International Nuclear Information System (INIS)

    Morgado, R.E.; Acobyan, R.; Shropsire, R.

    1998-01-01

    The Siberian Chemical Combine (SKhK), Laboratory Project Work Plan (Plan) is intended to assist the US Laboratory Project Team, and Department of Energy (DOE) staff with the management of the FY99 joint material protection control and accounting program (MPC and A) for enhancing nuclear material safeguards within the Siberian Chemical Combine. The DOE/Russian/Newly Independent States, Nuclear Material Task Force, uses a project work plan document for higher-level program management. The SKhK Plan is a component of the Russian Defense related Sites' input to that document. In addition, it contains task descriptions and a Gantt Chart covering the FY99 time-period. This FY99 window is part of a comprehensive, Project Status Gantt Chart for tasking and goal setting that extends to the year 2003. Secondary and tertiary levels of detail are incorporated therein and are for the use of laboratory project management. The SKhK Plan is a working document, and additions and modifications will be incorporated as the MPC and A project for SKhK evolves

  9. Sector activities and lessons learned around initial implementation of the United States national physical activity plan.

    Science.gov (United States)

    Evenson, Kelly R; Satinsky, Sara B

    2014-08-01

    National plans are increasingly common but infrequently evaluated. The 2010 United States National Physical Activity Plan (NPAP) provided strategies to increase population levels of physical activity. This paper describes (i) the initial accomplishments of the NPAP sector teams, and (ii) results from a process evaluation to determine how the sectors operated, their cross-sector collaboration, challenges encountered, and positive experiences. During 2011, a quarterly reporting system was developed to capture sector-level activities. A year-end interview derived more detailed information. Interviews with 12 sector leads were recorded, transcribed verbatim, and analyzed for common themes. The 6 sectors worked on goals from the implementation plan that focused broadly on education, promotion, intervention, policy, collaboration, and evaluation. Through year-end interviews, themes were generated around operations, goal setting, and cross-sector collaboration. Challenges to the NPAP work included lack of funding and time, the need for marketing and promotion, and organizational support. Positive experiences included collaboration, efficiency of work, enhanced community dynamic, and accomplishments toward NPAP goals. These initial results on the NPAP sector teams can be used as a baseline assessment for future monitoring. The lessons learned may be useful to other practitioners developing evaluations around state- or national-level plans.

  10. Project management a systems approach to planning, scheduling, and controlling

    CERN Document Server

    Kerzner, Harold

    2017-01-01

    Project Management is the bestselling text for students and professionals, presenting a streamlined approach to project management functions in full alignment with PMI(r)'s latest Project Management Body of Knowledge (PMBOK(r)). This new 12th edition has been updated to reflect the latest changes found in the PMBOK(r) Guide--Sixth Edition, and features new coverage of emerging topics including global stakeholder management, causes of failure, agile project management, project governance failure, customer approval milestones, classifying project metrics, and more. Supplementary materials are available for students, working professionals, and instructors. * Understand organizational structures and project management functions * Learn how to control costs, manage risk, and analyze trade-offs * Examine different methods used for planning, scheduling, QA, and more * Work effectively with customers and stakeholders from around the globe Project Management is the comprehensive reference to keep within arm's reach. ...

  11. Project Management Plan for the INEL technology logic diagrams

    International Nuclear Information System (INIS)

    Rudin, M.J.

    1992-10-01

    This Project Management Plan (PjMP) describes the elements of project planning and control that apply to activities outlined in Technical Task Plan (TTP) ID-121117, ''Technology Logic Diagrams For The INEL.'' The work on this project will be conducted by personnel in EG ampersand G Idaho, Inc.'s Waste Technology Development Program. Technology logic diagrams represent a formal methodology to identify technology gaps or needs within Environmental Restoration/Waste Management Operations, which will focus on Office of Environmental Restoration and Waste Management (EM-50) research and development, demonstration, test, and evaluation efforts throughout the US Department of Energy complex. This PjMP describes the objectives, organization, roles and responsibilities, workscope and processes for implementing and managing the technology logic diagram for the Idaho National Engineering Laboratory project

  12. Pad A treatability study long-range project plan

    International Nuclear Information System (INIS)

    Mousseau, J.D.

    1991-06-01

    This plan addresses the work to be accomplished by the Pad A Treatability Study Project. The purpose of this project is to investigate potential treatment and separation technologies, identify the best technologies, and to demonstrate by both lab- and pilot-scale demonstration, the most applicable remedial technologies for treating plutonium-contaminated salts at the Pad A site located at the Subsurface Disposal Area (SDA) at the Radioactive Waste Management Complex (RWMC) a the Idaho National Engineering Laboratory (INEL). The conduct of this project will be supported by other DOE laboratories, universities, and private industries, who will provide support for near-term demonstrations of treatment and separation technologies. The purpose of this long-range planning document is to present the detailed plan for the implementation of the Pad A Treatability Study Project

  13. Crawler Acquisition and Testing Demonstration Project Management Plan

    International Nuclear Information System (INIS)

    DEFIGH-PRICE, C.

    2000-01-01

    If the crawler based retrieval system is selected, this project management plan identifies the path forward for acquiring a crawler/track pump waste retrieval system, and completing sufficient testing to support deploying the crawler for as part of a retrieval technology demonstration for Tank 241-C-104. In the balance of the document, these activities will be referred to as the Crawler Acquisition and Testing Demonstration. During recent Tri-Party Agreement negotiations, TPA milestones were proposed for a sludge/hard heel waste retrieval demonstration in tank C-104. Specifically one of the proposed milestones requires completion of a cold demonstration of sufficient scale to support final design and testing of the equipment (M-45-03G) by 6/30/2004. A crawler-based retrieval system was one of the two options evaluated during the pre-conceptual engineering for C-104 retrieval (RPP-6843 Rev. 0). The alternative technology procurement initiated by the Hanford Tanks Initiative (HTI) project, combined with the pre-conceptual engineering for C-104 retrieval provide an opportunity to achieve compliance with the proposed TPA milestone M-45-03H. This Crawler Acquisition and Testing Demonstration project management plan identifies the plans, organizational interfaces and responsibilities, management control systems, reporting systems, timeline and requirements for the acquisition and testing of the crawler based retrieval system. This project management plan is complimentary to and supportive of the Project Management Plan for Retrieval of C-104 (RPP-6557). This project management plan focuses on utilizing and completing the efforts initiated under the Hanford Tanks Initiative (HTI) to acquire and cold test a commercial crawler based retrieval system. The crawler-based retrieval system will be purchased on a schedule to support design of the waste retrieval from tank C-104 (project W-523) and to meet the requirement of proposed TPA milestone M-45-03H. This Crawler

  14. Decommissioning plan - decommissioning project for KRR 1 and 2 (revised)

    International Nuclear Information System (INIS)

    Jung, K. J.; Paik, S. T.; Chung, U. S.; Jung, K. H.; Park, S. K.; Lee, D. G.; Kim, H. R.; Kim, J. K.; Yang, S. H.; Lee, B. J.

    2000-10-01

    This report is the revised Decommissioning Plan for the license of TRIGA research reactor decommissioning project according to Atomic Energy Act No. 31 and No. 36. The decommissioning plan includes the TRIGA reactor facilities, project management, decommissioning method, decontamination and dismantling activity, treatment, packaging, transportation and disposal of radioactive wastes. the report also explained the radiation protection plan and radiation safety management during the decommissioning period, and expressed the quality assurance system during the period and the site restoration after decommissioning. The first decommissioning plan was made by Hyundai Engineering Co, who is the design service company, was submitted to the Ministry of Science and Technology, and then was reviewed by the Korea Institute of Nuclear Safety. The first decommissioning plan was revised including answers for the questions arising from review process

  15. Decommissioning plan - decommissioning project for KRR 1 and 2 (revised)

    Energy Technology Data Exchange (ETDEWEB)

    Jung, K. J.; Paik, S. T.; Chung, U. S.; Jung, K. H.; Park, S. K.; Lee, D. G.; Kim, H. R.; Kim, J. K.; Yang, S. H.; Lee, B. J

    2000-10-01

    This report is the revised Decommissioning Plan for the license of TRIGA research reactor decommissioning project according to Atomic Energy Act No. 31 and No. 36. The decommissioning plan includes the TRIGA reactor facilities, project management, decommissioning method, decontamination and dismantling activity, treatment, packaging, transportation and disposal of radioactive wastes. the report also explained the radiation protection plan and radiation safety management during the decommissioning period, and expressed the quality assurance system during the period and the site restoration after decommissioning. The first decommissioning plan was made by Hyundai Engineering Co, who is the design service company, was submitted to the Ministry of Science and Technology, and then was reviewed by the Korea Institute of Nuclear Safety. The first decommissioning plan was revised including answers for the questions arising from review process.

  16. Medical support to Sri Lanka in the wake of tsunamis: planning considerations and lessons learned.

    Science.gov (United States)

    Lane, David A

    2006-10-01

    When massive tsunamis affected the coast of Sri Lanka and other Indian Ocean littorals, elements of the Third Force Service Support Group and assigned Navy, Air Force, Army, and Coast Guard units from the U.S. Pacific Command were "task organized" to form Combined Support Group-Sri Lanka (CSG-SL), charged to conduct humanitarian assistance/disaster relief (HA/DR) operations. The specific mission was to provide immediate relief to the affected population of Sri Lanka and the Maldives, to minimize loss of life, and to mitigate human suffering. A 30-person health care team deployed to the northern province of Jaffna and provided medical assistance to that chronically underserved and acutely overstressed region. For a 12-day period, the team served as the principal medical staff of an under-resourced government hospital and conducted mobile primary care clinics at nearby welfare camps housing > 7,000 internally displaced persons made homeless by the tsunamis. By every measurable standard, CSG-SL accomplished its assigned HA/DR task in Sri Lanka, including the medical mission. In doing so, the medical team learned many important lessons, including five of particular value to planners of similar relief operations in the future. This article discusses the context in which CSG-SL planned and executed the medical aspects of its HA/DR operations in Sri Lanka, and it describes the most significant medical lessons learned.

  17. Project summary plan for HTGR recycle reference facility

    International Nuclear Information System (INIS)

    Baxter, B.J.

    1979-11-01

    A summary plan is introduced for completing conceptual definition of an HTGR Recycle Reference Facility (HRRF). The plan describes a generic project management concept, often referred to as the requirements approach to systems engineering. The plan begins with reference flow sheets and provides for the progressive evolution of HRRF requirements and definition through feasibility, preconceptual, and conceptual phases. The plan lays end-to-end all the important activities and elements to be treated during each phase of design. Identified activities and elements are further supported by technical guideline documents, which describe methodology, needed terminology, and where relevant a worked example

  18. The ENN project. ENN exploitation plan.

    Science.gov (United States)

    Dekena, R; Rehm-Berbenni, C; Seyfried, K

    2000-01-01

    The objective of the ENN-European Neurologic Network project is to improve knowledge and treatment of sleep disorders, headache and epilepsy. The means to obtain this objective shall be certain software to be distributed to the appropriate users in the medical field and the collection of relevant cases, in order to set up a neurological database. It is intended that the distribution of the above mentioned software and access to the database, will be able to finance research projects in the neurological field. The outcome of the EU funded project have been six prototypes, which need further work in order to establish a system of compatible and linked products. A particular emphasis of this work should be put on making the products as process oriented as possible. At the time being there are already products available in the market, which would be competing with particular ENN prototypes, but there is no set of compatible and linked products, which would be comparable with the intended set of ENN neurological tools. Such set of tools therefore could be a unique selling proposition. Intellectual property rights and legal implications have to be taken into consideration for the marketing of the ENN products. It has to be made sure, that no third party can assert violation of its IPRs and that, a protection of the products can be attained by appropriate application for IPRs. In the legal field in particular the prescriptions of data protection legislation have to be observed e.g. by obtaining the written consent of patients, whose cases are reported. The marketing concept should be set up as a short-term, middle-term, long-term strategy. The short-term strategy should concentrate on carrying out a market validation study at European level and simultaneously the development from prototype to products. The middle-term strategy should be directed towards the market introduction of the ENN products in Europe. The long-term strategy should comprise marketing of the products

  19. When Commas Meet Kryptonite: Classroom Lessons from the Comic Book Project. Language and Literacy Series

    Science.gov (United States)

    Bitz, Michael

    2010-01-01

    This definitive book presents the newest research linking graphic narratives and literacy learning, as well as the tools teachers will need to make comic book projects a success in their classrooms. The Comic Book Project (www.comicbookproject.org) is an internationally celebrated initiative where children plan, write, design, and publish original…

  20. Energy Strategic Planning & Self-Sufficiency Project

    Energy Technology Data Exchange (ETDEWEB)

    Greg Retzlaff

    2005-03-30

    This report provides information regarding options available, their advantages and disadvantages, and the costs for pursuing activities to advance Smith River Rancheria toward an energy program that reduces their energy costs, allows greater self-sufficiency and stimulates economic development and employment opportunities within and around the reservation. The primary subjects addressed in this report are as follow: (1) Baseline Assessment of Current Energy Costs--An evaluation of the historical energy costs for Smith River was conducted to identify the costs for each component of their energy supply to better assess changes that can be considered for energy cost reductions. (2) Research Viable Energy Options--This includes a general description of many power generation technologies and identification of their relative costs, advantages and disadvantages. Through this research the generation technology options that are most suited for this application were identified. (3) Project Development Considerations--The basic steps and associated challenges of developing a generation project utilizing the selected technologies are identified and discussed. This included items like selling to third parties, wheeling, electrical interconnections, fuel supply, permitting, standby power, and transmission studies. (4) Energy Conservation--The myriad of federal, state and utility programs offered for low-income weatherization and utility bill payment assistance are identified, their qualification requirements discussed, and the subsequent benefits outlined. (5) Establishing an Energy Organization--The report includes a high level discussion of formation of a utility to serve the Tribal membership. The value or advantages of such action is discussed along with some of the challenges. (6) Training--Training opportunities available to the Tribal membership are identified.

  1. Denakenaga' for Children. Lesson Plans for Teaching Denakenaga' (Minto-Nenana Tanana) to Children in Elementary Grades.

    Science.gov (United States)

    Thompson, Chad; Frank, Ellen

    This curriculum for elementary school-level instruction in Denakenaga' is intended for development of oral native language skills. Included are plans for 60 25-minute lessons, arranged in 11 units: basic conversation; food and eating; hunting and animals; clothing and morning routine; weather; body parts; dogs and sleds; numbers; the village;…

  2. A Grounded Theory of Preservice Music Educators' Lesson Planning Processes within Field Experience Methods Courses

    Science.gov (United States)

    Parker, Elizabeth Cassidy; Bond, Vanessa L.; Powell, Sean R.

    2017-01-01

    The purpose of this grounded theory study was to understand the process of field experience lesson planning for preservice music educators enrolled in choral, general, and instrumental music education courses within three university contexts. Data sources included multiple interviews, written responses, and field texts from 42 participants. Four…

  3. National Training Course. Emergency Medical Technician. Paramedic. Instructor's Lesson Plans. Module II. Human Systems and Patient Assessment.

    Science.gov (United States)

    National Highway Traffic Safety Administration (DOT), Washington, DC.

    This instructor's lesson plan guide on human systems and patient assessment is one of fifteen modules designed for use in the training of emergency medical technicians (paramedics). Four units are presented: (1) medical terminology, which covers some common prefixes and suffixes and the use of the medical dictionary; (2) an overview of the…

  4. Upper School Maths: Lesson Plans and Activities for Ages 9-11 Years. Series of Caribbean Volunteer Publications, No. 9.

    Science.gov (United States)

    Voluntary Services Overseas, Castries (St. Lucia).

    This collection of lesson plans and activities for students aged 9-11 years is based on a science curriculum developed by a group of Caribbean nations. The activities pertain to topics such as place value, prime and composite numbers, the sieve of Eratosthenes, square numbers, factors and multiples, sequences, averages, geometry, symmetry,…

  5. The Groundwater Performance Assessment Project Quality Assurance Plan

    International Nuclear Information System (INIS)

    Luttrell, Stuart P.

    2006-01-01

    U.S. Department of Energy (DOE) has monitored groundwater on the Hanford Site since the 1940s to help determine what chemical and radiological contaminants have made their way into the groundwater. As regulatory requirements for monitoring increased in the 1980s, there began to be some overlap between various programs. DOE established the Groundwater Performance Assessment Project (groundwater project) in 1996 to ensure protection of the public and the environment while improving the efficiency of monitoring activities. The groundwater project is designed to support all groundwater monitoring needs at the site, eliminate redundant sampling and analysis, and establish a cost-effective hierarchy for groundwater monitoring activities. This document provides the quality assurance guidelines that will be followed by the groundwater project. This QA Plan is based on the QA requirements of DOE Order 414.1C, Quality Assurance, and 10 CFR 830, Subpart A--General Provisions/Quality Assurance Requirements as delineated in Pacific Northwest National Laboratory's Standards-Based Management System. In addition, the groundwater project is subject to the Environmental Protection Agency (EPA) Requirements for Quality Assurance Project Plans (EPA/240/B-01/003, QA/R-5). The groundwater project has determined that the Hanford Analytical Services Quality Assurance Requirements Documents (HASQARD, DOE/RL-96-68) apply to portions of this project and to the subcontractors. HASQARD requirements are discussed within applicable sections of this plan

  6. The Columbia River Protection Supplemental Technologies Quality Assurance Project Plan

    International Nuclear Information System (INIS)

    Fix, Anne

    2007-01-01

    The U.S. Department of Energy (DOE) has conducted interim groundwater remedial activities on the Hanford Site since the mid-1990s for several groundwater contamination plumes. DOE established the Columbia River Protection Supplemental Technologies Project (Technologies Project) in 2006 to evaluate alternative treatment technologies. The objectives for the technology project are as follows: develop a 300 Area polyphosphate treatability test to immobilize uranium, design and test infiltration of a phosphate/apatite technology for Sr-90 at 100-N, perform carbon tetrachloride and chloroform attenuation parameter studies, perform vadose zone chromium characterization and geochemistry studies, perform in situ biostimulation of chromium studies for a reducing barrier at 100-D, and perform a treatability test for phytoremediation for Sr-90 at 100-N. This document provides the quality assurance guidelines that will be followed by the Technologies Project. This Quality Assurance Project Plan is based on the quality assurance requirements of DOE Order 414.1C, Quality Assurance, and 10 CFR 830, Subpart A--Quality Assurance Requirements as delineated in Pacific Northwest National Laboratory?s Standards-Based Management System. In addition, the technology project is subject to the Environmental Protection Agency (EPA) Requirements for Quality Assurance Project Plans (EPA/240/B-01/003, QA/R-5). The Hanford Analytical Services Quality Assurance Requirements Documents (HASQARD, DOE/RL-96-68) apply to portions of this project and to the subcontractors. HASQARD requirements are discussed within applicable sections of this plan.

  7. Richland Environmental Restoration Project Baseline Multi Year Work Plan Volume 1 Richland Environmental Restoration Project Plan

    International Nuclear Information System (INIS)

    Wintczak, T.M.

    2001-01-01

    The purpose of this project specification is to provide an overall scoping and document for the Environmental Restoration project, and to provide a link between the overall Hanford Site scope and the ER project. The purpose of this project specification is to provide an overall scoping document for the ER Project, and to provide a link between the overall Hanford Site scope and the ER Project. Additionally, this specification provides an integrated and consolidated source of information for the Richland ER Project. It identifies the ER Project vision, mission, and goals, as well as the operational history of the Hanford Site, along with environmental setting and hazards. This ER Project Specification is part of the overall ER Project baseline

  8. 49 CFR 633.25 - Contents of a project management plan.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false Contents of a project management plan. 633.25... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.25 Contents of a project management plan. At a minimum, a recipient's project management plan shall include...

  9. 49 CFR 633.27 - Implementation of a project management plan.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan by...

  10. How Do Lessons Learned on the International Space Station (ISS) Help Plan Life Support for Mars?

    Science.gov (United States)

    Jones, Harry W.; Hodgson, Edward W.; Gentry, Gregory J.; Kliss, Mark H.

    2016-01-01

    How can our experience in developing and operating the International Space Station (ISS) guide the design, development, and operation of life support for the journey to Mars? The Mars deep space Environmental Control and Life Support System (ECLSS) must incorporate the knowledge and experience gained in developing ECLSS for low Earth orbit, but it must also meet the challenging new requirements of operation in deep space where there is no possibility of emergency resupply or quick crew return. The understanding gained by developing ISS flight hardware and successfully supporting a crew in orbit for many years is uniquely instructive. Different requirements for Mars life support suggest that different decisions may be made in design, testing, and operations planning, but the lessons learned developing the ECLSS for ISS provide valuable guidance.

  11. Single-shell tank interim stabilization project plan

    Energy Technology Data Exchange (ETDEWEB)

    Ross, W.E.

    1998-03-27

    Solid and liquid radioactive waste continues to be stored in 149 single-shell tanks at the Hanford Site. To date, 119 tanks have had most of the pumpable liquid removed by interim stabilization. Thirty tanks remain to be stabilized. One of these tanks (C-106) will be stabilized by retrieval of the tank contents. The remaining 29 tanks will be interim stabilized by saltwell pumping. In the summer of 1997, the US Department of Energy (DOE) placed a moratorium on the startup of additional saltwell pumping systems because of funding constraints and proposed modifications to the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) milestones to the Washington State Department of Ecology (Ecology). In a letter dated February 10, 1998, Final Determination Pursuant to Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) in the Matter of the Disapproval of the DOE`s Change Control Form M-41-97-01 (Fitzsimmons 1998), Ecology disapproved the DOE Change Control Form M-41-97-01. In response, Fluor Daniel Hanford, Inc. (FDH) directed Lockheed Martin Hanford Corporation (LNMC) to initiate development of a project plan in a letter dated February 25, 1998, Direction for Development of an Aggressive Single-Shell Tank (SST) Interim Stabilization Completion Project Plan in Support of Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement). In a letter dated March 2, 1998, Request for an Aggressive Single-Shell Tank (SST) Interim Stabilization Completion Project Plan, the DOE reaffirmed the need for an aggressive SST interim stabilization completion project plan to support a finalized Tri-Party Agreement Milestone M-41 recovery plan. This project plan establishes the management framework for conduct of the TWRS Single-Shell Tank Interim Stabilization completion program. Specifically, this plan defines the mission needs and requirements; technical objectives and approach; organizational structure, roles, responsibilities

  12. Single-shell tank interim stabilization project plan

    International Nuclear Information System (INIS)

    Ross, W.E.

    1998-01-01

    Solid and liquid radioactive waste continues to be stored in 149 single-shell tanks at the Hanford Site. To date, 119 tanks have had most of the pumpable liquid removed by interim stabilization. Thirty tanks remain to be stabilized. One of these tanks (C-106) will be stabilized by retrieval of the tank contents. The remaining 29 tanks will be interim stabilized by saltwell pumping. In the summer of 1997, the US Department of Energy (DOE) placed a moratorium on the startup of additional saltwell pumping systems because of funding constraints and proposed modifications to the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) milestones to the Washington State Department of Ecology (Ecology). In a letter dated February 10, 1998, Final Determination Pursuant to Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) in the Matter of the Disapproval of the DOE's Change Control Form M-41-97-01 (Fitzsimmons 1998), Ecology disapproved the DOE Change Control Form M-41-97-01. In response, Fluor Daniel Hanford, Inc. (FDH) directed Lockheed Martin Hanford Corporation (LNMC) to initiate development of a project plan in a letter dated February 25, 1998, Direction for Development of an Aggressive Single-Shell Tank (SST) Interim Stabilization Completion Project Plan in Support of Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement). In a letter dated March 2, 1998, Request for an Aggressive Single-Shell Tank (SST) Interim Stabilization Completion Project Plan, the DOE reaffirmed the need for an aggressive SST interim stabilization completion project plan to support a finalized Tri-Party Agreement Milestone M-41 recovery plan. This project plan establishes the management framework for conduct of the TWRS Single-Shell Tank Interim Stabilization completion program. Specifically, this plan defines the mission needs and requirements; technical objectives and approach; organizational structure, roles, responsibilities

  13. Examining approaches to renewables consultation. Lessons from Awel Aman Tawe community wind farm project

    Energy Technology Data Exchange (ETDEWEB)

    Hinshelwood, E; McCallum, D

    2001-07-01

    The overall aim was to develop and test a range of methods for a Participatory Assessment Process (PAP) in a large community on the subject of a Renewable Energy project in the area. Furthermore, to extract lessons regarding the methods and approaches undertaken. The specific objectives were: 1. To identify and shape appropriate tools, methods and approaches for undertaking a fair community assessment process regarding a Renewable Energy project in the locality. 2. To conduct an in-depth (ten month) community consultation and assessment process for a proposed wind farm. 3. To assess the methods and approaches used in the community consultation and assessment process for their efficiency and value to other developers and community groups. 4. To write up and disseminate the findings regarding the most valuable, efficient and appropriate methods and approaches undertaken. (Author)

  14. The PLX- α Project: Progress and Plans

    Science.gov (United States)

    Hsu, S.; Witherspoon, F. D.; Cassibry, J.; Gilmore, M.; Samulyak, R.; Stoltz, P.; PLX-α Team

    2016-10-01

    The Plasma Liner Experiment-ALPHA (PLX- α) project aims to demonstrate the viability of spherically imploding plasma liners as a standoff driver for plasma-jet-driven magneto-inertial fusion (PJMIF). In the past year, progress has been made in designing and testing new contoured-gap coaxial guns, 3D model development and simulations (via Eulerian and Lagrangian hydrocodes) of PLX- α-relevant plasma-liner formation/implosion via up to 60 plasma jets ( 100 kJ of liner kinetic energy), 1D semi-analytic and numerical modeling of reactor-scale PJMIF (10s of MJ of liner kinetic energy), and preparation/upgrade of the PLX facility/diagnostics. The design goal for the coaxial guns is to form plasma jets of up to initial n 2 ×1016 cm-3, mass 5 mg, Vjet 50 km/s, rjet = 4 cm, and length 10 cm. The modeling research is assessing ram-pressure amplification and Mach-number degradation during liner convergence, evolution of liner non-uniformity amplitude and mode number, and exploration of PJMIF configurations with promising 1D and 2D fusion gains. Conical multi-jet-merging and full-4 π experiments will commence in Fall, 2016 and late 2017, respectively. Supported by the ARPA-E ALPHA Program.

  15. Using project management methodology to plan and track inpatient care.

    Science.gov (United States)

    Kaufman, Darren S

    2005-08-01

    Effective care of each patient throughout a hospital admission involves executing a specific set of tasks to produce a favorable outcome within an appropriate time frame. The ProjectRounds methodology, which can be implemented using widely available software, incorporates the principles of project management in planning and control hospital inpatient care. It consists of four stages--clinical assessment, planning, scheduling, and tracking. OVERVIEW OF PROJECTROUNDS AND EXAMPLE: As an example, a 68-year-old-man is admitted with pneumonia. In clinical assessment, the admitting physician uses an assessment tool that prompts her to list all the patient's clinical issues, define the conditions that need to be met to discharge the patient, highlight special problems, and list any consultations, diagnostic tests, and procedures that are planned. In planning, the work breakdown structure--a tabulation of all the tasks in the "project" (the admission)--is created. In scheduling, a project schedule is generated, and in tracking, the clinical team evaluates and monitors the project's course. During interdisciplinary clinical rounds, the progress of the patient's hospital care can be tracked and quantified by employing the percent complete method. Tracking can be used as a "dashboard," providing a concise summary of the care that needs to be and has been rendered to the patient. Applying the tenets of project management can optimize the process of providing health care to hospital inpatients.

  16. Final Report for the Soboba Strategic Tribal Energy Planning Project

    Energy Technology Data Exchange (ETDEWEB)

    Miller, Kim [EPA Specialist

    2013-09-17

    In 2011 the Tribe was awarded funds from the Department of Energy to formulate the Soboba Strategic Tribal Energy Plan. This will be a guiding document used throughout the planning of projects focused on energy reduction on the Reservation. The Soboba Strategic Tribal Energy Plan's goal is to create a Five Year Energy Plan for the Soboba Band of Luiseno Indians in San Jacinto, California. This plan will guide the decision making process towards consistent progress leading to the Tribal goal of a 25% reduction in energy consumption in the next five years. It will additionally outline energy usage/patterns and will edentify areas the Tribe can decrease energy use and increase efficiency. The report documents activities undertaken under the grant, as well as incldues the Tribe's strategif energy plan.

  17. Preliminary Project Execution Plan for the Remote-Handled Low-Level Waste Disposal Project

    Energy Technology Data Exchange (ETDEWEB)

    David Duncan

    2011-05-01

    This preliminary project execution plan (PEP) defines U.S. Department of Energy (DOE) project objectives, roles and responsibilities of project participants, project organization, and controls to effectively manage acquisition of capital funds for construction of a proposed remote-handled low-level waste (LLW) disposal facility at the Idaho National Laboratory (INL). The plan addresses the policies, requirements, and critical decision (CD) responsibilities identified in DOE Order 413.3B, 'Program and Project Management for the Acquisition of Capital Assets.' This plan is intended to be a 'living document' that will be periodically updated as the project progresses through the CD process to construction and turnover for operation.

  18. Cost-effective facility disposition planning with safety and health lessons learned and good practices from the Oak Ridge Decontamination and Decommissioning Program

    International Nuclear Information System (INIS)

    1998-05-01

    An emphasis on transition and safe disposition of DOE excess facilities has brought about significant challenges to managing worker, public, and environmental risks. The transition and disposition activities involve a diverse range of hazardous facilities that are old, poorly maintained, and contain radioactive and hazardous substances, the extent of which may be unknown. In addition, many excess facilities do not have historical facility documents such as operating records, plant and instrumentation diagrams, and incident records. The purpose of this report is to present an overview of the Oak Ridge Decontamination and Decommissioning (D and D) Program, its safety performance, and associated safety and health lessons learned and good practices. Illustrative examples of these lessons learned and good practices are also provided. The primary focus of this report is on the safety and health activities and implications associated with the planning phase of Oak Ridge facility disposition projects. Section 1.0 of this report provides the background and purpose of the report. Section 2.0 presents an overview of the facility disposition activities from which the lessons learned and good practices discussed in Section 3.0 were derived

  19. St. Louis FUSRAP Lessons Learned

    International Nuclear Information System (INIS)

    Eberlin, J.; Williams, D.; Mueller, D.

    2003-01-01

    The purpose of this paper is to present lessons learned from fours years' experience conducting Remedial Investigation and Remedial Action activities at the St. Louis Downtown Site (SLDS) under the Formerly Utilized Sites Remedial Action Program (FUSRAP). Many FUSRAP sites are experiencing challenges conducting Remedial Actions within forecasted volume and budget estimates. The St. Louis FUSRAP lessons learned provide insight to options for cost effective remediation at FUSRAP sites. The lessons learned are focused on project planning (budget and schedule), investigation, design, and construction

  20. UMTRA project water sampling and analysis plan, Tuba City, Arizona

    International Nuclear Information System (INIS)

    1996-02-01

    Planned, routine ground water sampling activities at the U.S. Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project site in Tuba City, Arizona, are described in the following sections of this water sampling and analysis plan (WSAP). This plan identifies and justifies the sampling locations, analytical parameters, detection limits, and sampling frequency for the stations routinely monitored at the site. The ground water data are used for site characterization and risk assessment. The regulatory basis for routine ground water monitoring at UMTRA Project sites is derived from the U.S. Environmental Protection Agency (EPA) regulations in 40 CFR Part 192 (1994) and the final EPA standards of 1995 (60 FR 2854). Sampling procedures are guided by the UMTRA Project standard operating procedures (SOP) (JEG, n.d.), and the most effective technical approach for the site

  1. Resource Constrained Planning of Multiple Projects with Separable Activities

    Science.gov (United States)

    Fujii, Susumu; Morita, Hiroshi; Kanawa, Takuya

    In this study we consider a resource constrained planning problem of multiple projects with separable activities. This problem provides a plan to process the activities considering a resource availability with time window. We propose a solution algorithm based on the branch and bound method to obtain the optimal solution minimizing the completion time of all projects. We develop three methods for improvement of computational efficiency, that is, to obtain initial solution with minimum slack time rule, to estimate lower bound considering both time and resource constraints and to introduce an equivalence relation for bounding operation. The effectiveness of the proposed methods is demonstrated by numerical examples. Especially as the number of planning projects increases, the average computational time and the number of searched nodes are reduced.

  2. First-of-A-Kind Control Room Modernization Project Plan

    Energy Technology Data Exchange (ETDEWEB)

    Thomas, Kenneth David [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2016-02-01

    This project plan describes a comprehensive approach to the design of an end-state concept for a modernized control room for Palo Verde. It describes the collaboration arrangement between the DOE LWRS Program Control Room Modernization Project and the APS Palo Verde Nuclear Generating Station. It further describes the role of other collaborators, including the Institute for Energy Technology (IFE) and the Electric Power Research Institute (EPRI). It combines advanced tools, methodologies, and facilities to enable a science-based approach to the validation of applicable engineering and human factors principles for nuclear plant control rooms. It addresses the required project results and documentation to demonstrate compliance with regulatory requirements. It describes the project tasks that will be conducted in the project, and the deliverable reports that will be developed through these tasks. This project plan will be updated as new tasks are added and as project milestones are completed. It will serve as an ongoing description on the project both for project participants and for industry stakeholders.

  3. Evolution of project planning tools in a matrix organization

    Energy Technology Data Exchange (ETDEWEB)

    Furaus, J.P.; Figueroa-McInteer, C.; McKeever, P.S.; Wisler, D.B. [Sandia National Labs., Albuquerque, NM (United States); Zavadil, J.T. [Infomatrix (United States)

    1996-10-01

    Until recently, the Corporate Construction Program at Sandia was experiencing difficulties in managing projects: poor planning and cost estimating caused schedule and budget problems. The first step taken was a Microsoft {reg_sign} Project schedule that provides a standard template for scheduling individual construction projects. It is broken down according to the life cycle of the project and prevents the project team from leaving out an important item. A WBS (work breakdown structure) dictionary was also developed that describes how capital and operating funds are used to develop, design, construct, equip, and manage projects. We also developed a matrix chart that maps the planning guide against the major types of construction projects at Sandia. The guide, dictionary, and matrix chart offer enough flexibility that the project manager can make choices about how to structure work, yet ensure that all work rolls up to the cost categories and key DOE WBS elements. As requirements change, the tools can be updated; they also serve as training tools for new project team members.

  4. Near-facility environmental monitoring quality assurance project plan

    International Nuclear Information System (INIS)

    McKinney, S.M.

    1997-01-01

    This Quality Assurance Project Plan addresses the quality assurance requirements for the activities associated with the preoperational and near facility environmental monitoring performed by Waste Management Federal Services, Inc., Northwest Operations and supersedes WHC-EP-0538-2. This plan applies to all sampling and monitoring activities performed by waste management Federal Services, Inc., Northwest Operations in implementing facility environmental monitoring at the Hanford Site

  5. The Single And Multi Project Approach To Planning And Scheduling

    DEFF Research Database (Denmark)

    Andersson, Niclas

    2008-01-01

    The fragmentation of the construction industry in Denmark is reflected in the organisation of construction projects, which typically involves a large number of subcontractors. The main contractor, being responsible for the planning and scheduling of construction work, is thus faced with the chall......The fragmentation of the construction industry in Denmark is reflected in the organisation of construction projects, which typically involves a large number of subcontractors. The main contractor, being responsible for the planning and scheduling of construction work, is thus faced...

  6. UMTRA Project Office quality assurance program plan. Revision 6

    International Nuclear Information System (INIS)

    1994-09-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project was established to accomplish remedial actions at inactive uranium mill tailings sites. The UMTRA Project's mission is to stabilize and control the residual radioactive materials at designated sites in a safe and environmentally sound manner so as to minimize or eliminate radiation health hazards to the public. Because these efforts may involve possible risks to public health and safety, a quality assurance (QA) program that conforms to the applicable criteria has been established to control the quality of the work. This document, the Quality Assurance Program Plan (QAPP), brings into one document the essential criteria to be applied on a selective basis, depending upon the nature of the activity being conducted, and describes how those criteria shall be applied to the UMTRA Project. QA requirements contained in this QAPP shall apply to all personnel, processes, and activities, including planning, scheduling, and cost control, performed by the UMTRA Project Office and its contractors

  7. Selection of projects in the regional energy planning

    International Nuclear Information System (INIS)

    Ramirez P, R.; Navas M, F.

    1993-01-01

    The processes of regional energy planning have changed vastly in the last years and it will continue changing in the future for the new norm of the State. This work tries to show the use of systematic tools in the selection of regional energy projects. It discusses a methodology of selection of projects based on a multivariate technical. It is applied in the Southwestern region of Colombia and both selection and priority results are obtained. The designed methodology allows to make the selection of projects in an automatic way with a software designed for such an end. In the case of Southwestern it arrives to a briefcase of projects for an energy plan and made for other races

  8. Work plan for the Hanford Environmental Dose Reconstruction Project

    Energy Technology Data Exchange (ETDEWEB)

    1989-12-01

    The primary objective of the Hanford Environmental Dose Reconstruction (HEDR) Project is to estimate the radiation doses that populations could have received from nuclear operations at the Hanford Site since 1944, with descriptions of uncertainties inherent in such estimates. The secondary objective is to make project records--information that HEDR staff members used to estimate radiation doses--available to the public. Preliminary dose estimates for a limited geographic area and time period, certain radionuclides, and certain populations are planned to be available in 1990; complete results are planned to be reported in 1993. Project reports and references used in the reports are available to the public in the DOE Public Reading Room in Richland, Washington. Project progress is documented in monthly reports, which are also available to the public in the DOE Public Reading Room.

  9. Quality assurance program plan for cesium legacy project

    International Nuclear Information System (INIS)

    Tanke, J.M.

    1997-01-01

    This Quality Assurance Program Plan (QAPP) provides information on how the Quality Assurance Program is implemented for the Cesium Legacy Project. It applies to those items and tasks which affect the completion of activities identified in the work breakdown structure of the Project Management Plan (PMP). These activities include all aspects of cask transportation, project related operations within the 324 Building, and waste management as it relates to the specific activities of this project. General facility activities (i.e. 324 Building Operations, Central Waste Complex Operations, etc.) are covered in other appropriate QAPPs. The 324 Building is currently transitioning from being a Pacific Northwest National Laboratory (PNNL) managed facility to a B and W Hanford Company (BWHC) managed facility. During this transition process existing PNNL procedures and documents will be utilized until replaced by BWHC procedures and documents

  10. Strategic plan: A tool to improve IPP project earnings

    International Nuclear Information System (INIS)

    LeClerc, S.

    1997-01-01

    This paper presents a strategic plan to analyze and convert project operations to gain short-term and long-term economic benefits. Areas of Opportunity were identified which may result in improved project economics from Independent Power Producers' project reviews. This paper discusses each Area of Opportunity, suggests options for investigation, and provides a potential magnitude of upside for solid fuel circulating fluidized bed projects in the 50 MW project size. The Areas of Opportunity are: (1) Power Purchase Agreement Modifications; (2) Fuel Use Optimization; (3) Power Plant Upgrades; (4) Power Plant Depreciation Schedule And FAS 121 Analysis; (5) Operation ampersand Maintenance Review; (6) Financial Contract Review; (7) Environmental Review; (8) Insurance Coverage Review; (9) Internal Management Review; and (10) Strategic Development For Energy Sales. Ten appendices are included which comprise a sample Strategic Plan: (1) Potential Plant Upgrades, (2) Enhancement Criteria, (3) Age of Coal Burning Plants, (4) Btu Energy Price Summary, (5) Typical Operation and Maintenance Audit Findings, (6) Typical Performance Objectives and Guidelines, (7) Typical Heavy Metal Emissions, (8) Typical Strategic Plan Formulation, (9) Strategic Plan Implementation Schedule, and (10) Typical Decision Tree. 8 refs

  11. Remedial action and waste disposal project - ERDF readiness evaluation plan

    International Nuclear Information System (INIS)

    Casbon, M.A.

    1996-06-01

    This Readiness Evaluation Report presents the results of the project readiness evaluation to assess the readiness of the Environmental Restoration and Disposal Facility. The evaluation was conducted at the conclusion of a series of readiness activities that began in January 1996. These activities included completion of the physical plant; preparation, review, and approval of operating procedures; definition and assembly of the necessary project and operational organizations; and activities leading to regulatory approval of the plant and operating plans

  12. NIF Projects Controls and Information Systems Software Quality Assurance Plan

    Energy Technology Data Exchange (ETDEWEB)

    Fishler, B

    2011-03-18

    Quality achievement for the National Ignition Facility (NIF) and the National Ignition Campaign (NIC) is the responsibility of the NIF Projects line organization as described in the NIF and Photon Science Directorate Quality Assurance Plan (NIF QA Plan). This Software Quality Assurance Plan (SQAP) is subordinate to the NIF QA Plan and establishes quality assurance (QA) activities for the software subsystems within Controls and Information Systems (CIS). This SQAP implements an activity level software quality assurance plan for NIF Projects as required by the LLNL Institutional Software Quality Assurance Program (ISQAP). Planned QA activities help achieve, assess, and maintain appropriate quality of software developed and/or acquired for control systems, shot data systems, laser performance modeling systems, business applications, industrial control and safety systems, and information technology systems. The objective of this SQAP is to ensure that appropriate controls are developed and implemented for management planning, work execution, and quality assessment of the CIS organization's software activities. The CIS line organization places special QA emphasis on rigorous configuration control, change management, testing, and issue tracking to help achieve its quality goals.

  13. Achieving Sustainable Value Planning For Malaysian Public Projects

    Directory of Open Access Journals (Sweden)

    Muhammad Faudzi

    2016-01-01

    Full Text Available Sustainability is the central development issue in the modern economy. Through sustainable development, quality of life can be improved or maintained over time. Since Malaysia is targeting to become a high-income nation by the year 2020, financial investment in public projects should be planned comprehensively so that it will generate immediate and long-term benefits to the country and the people. Within the currently tight financial environment, achieving value for money in public spending is seen as one of the enablers to maintain the right momentum of economic growth. Previous studies have established the importance of integrating sustainability consideration into Value Planning protocol in order to achieve value for money, underpinned by the sustainable development agenda. Despite the establishment of the framework for the integration, the opportunity of such integration within the Malaysian Value Planning protocol for public projects remains unclear. The present state of sustainability consideration within the Value Planning practice should be first evaluated, so that potential interventions to enhance the integration can be introduced. Responding to the gap, this exploratory study was conducted. The data was collected by means of document analysis, interviews and observations; subsequently analysed using the Template Analysis technique. Based on the current practice of Value Planning in Malaysia, ten interventions are proposed to transform the present practice into Sustainable Value Planning. Sustainable Value Planning is seen as a comprehensive concept in achieving value for money in public spending underpinned by the overarching concept of sustainability

  14. NIF Projects Controls and Information Systems Software Quality Assurance Plan

    International Nuclear Information System (INIS)

    Fishler, B.

    2011-01-01

    Quality achievement for the National Ignition Facility (NIF) and the National Ignition Campaign (NIC) is the responsibility of the NIF Projects line organization as described in the NIF and Photon Science Directorate Quality Assurance Plan (NIF QA Plan). This Software Quality Assurance Plan (SQAP) is subordinate to the NIF QA Plan and establishes quality assurance (QA) activities for the software subsystems within Controls and Information Systems (CIS). This SQAP implements an activity level software quality assurance plan for NIF Projects as required by the LLNL Institutional Software Quality Assurance Program (ISQAP). Planned QA activities help achieve, assess, and maintain appropriate quality of software developed and/or acquired for control systems, shot data systems, laser performance modeling systems, business applications, industrial control and safety systems, and information technology systems. The objective of this SQAP is to ensure that appropriate controls are developed and implemented for management planning, work execution, and quality assessment of the CIS organization's software activities. The CIS line organization places special QA emphasis on rigorous configuration control, change management, testing, and issue tracking to help achieve its quality goals.

  15. Lessons learned in digital upgrade projects digital control system implementation at US nuclear power stations

    International Nuclear Information System (INIS)

    Kelley, S.; Bolian, T. W.

    2006-01-01

    AREVA NP has gained significant experience during the past five years in digital upgrades at operating nuclear power stations in the US. Plants are seeking modernization with digital technology to address obsolescence, spare parts availability, vendor support, increasing age-related failures and diminished reliability. New systems offer improved reliability and functionality, and decreased maintenance requirements. Significant lessons learned have been identified relating to the areas of licensing, equipment qualification, software quality assurance and other topics specific to digital controls. Digital control systems have been installed in non safety-related control applications at many utilities within the last 15 years. There have also been a few replacements of small safety-related systems with digital technology. Digital control systems are proving to be reliable, accurate, and easy to maintain. Digital technology is gaining acceptance and momentum with both utilities and regulatory agencies based upon the successes of these installations. Also, new plants are being designed with integrated digital control systems. To support plant life extension and address obsolescence of critical components, utilities are beginning to install digital technology for primary safety-system replacement. AREVA NP analyzed operating experience and lessons learned from its own digital upgrade projects as well as industry-wide experience to identify key issues that should be considered when implementing digital controls in nuclear power stations

  16. Writing Assignments in Disguise: Lessons Learned Using Video Projects in the Classroom

    Science.gov (United States)

    Wade, P.; Courtney, A.

    2012-12-01

    This study describes the instructional approach of using student-created video documentaries as projects in an undergraduate non-science majors' Energy Perspectives science course. Four years of teaching this course provided many reflective teaching moments from which we have enhanced our instructional approach to teaching students how to construct a quality Ken Burn's style science video. Fundamental to a good video documentary is the story told via a narrative which involves significant writing, editing and rewriting. Many students primarily associate a video documentary with visual imagery and do not realize the importance of writing in the production of the video. Required components of the student-created video include: 1) select a topic, 2) conduct research, 3) write an outline, 4) write a narrative, 5) construct a project storyboard, 6) shoot or acquire video and photos (from legal sources), 7) record the narrative, 8) construct the video documentary, 9) edit and 10) finalize the project. Two knowledge survey instruments (administered pre- and post) were used for assessment purposes. One survey focused on the skills necessary to research and produce video documentaries and the second survey assessed students' content knowledge acquired from each documentary. This talk will focus on the components necessary for video documentaries and the instructional lessons learned over the years. Additionally, results from both surveys and student reflections of the video project will be shared.

  17. Merging symmetry projection methods with coupled cluster theory: Lessons from the Lipkin model Hamiltonian

    Energy Technology Data Exchange (ETDEWEB)

    Wahlen-Strothman, J. M. [Rice Univ., Houston, TX (United States); Henderson, T. H. [Rice Univ., Houston, TX (United States); Hermes, M. R. [Rice Univ., Houston, TX (United States); Degroote, M. [Rice Univ., Houston, TX (United States); Qiu, Y. [Rice Univ., Houston, TX (United States); Zhao, J. [Rice Univ., Houston, TX (United States); Dukelsky, J. [Consejo Superior de Investigaciones Cientificas (CSIC), Madrid (Spain). Inst. de Estructura de la Materia; Scuseria, G. E. [Rice Univ., Houston, TX (United States)

    2018-01-03

    Coupled cluster and symmetry projected Hartree-Fock are two central paradigms in electronic structure theory. However, they are very different. Single reference coupled cluster is highly successful for treating weakly correlated systems, but fails under strong correlation unless one sacrifices good quantum numbers and works with broken-symmetry wave functions, which is unphysical for finite systems. Symmetry projection is effective for the treatment of strong correlation at the mean-field level through multireference non-orthogonal configuration interaction wavefunctions, but unlike coupled cluster, it is neither size extensive nor ideal for treating dynamic correlation. We here examine different scenarios for merging these two dissimilar theories. We carry out this exercise over the integrable Lipkin model Hamiltonian, which despite its simplicity, encompasses non-trivial physics for degenerate systems and can be solved via diagonalization for a very large number of particles. We show how symmetry projection and coupled cluster doubles individually fail in different correlation limits, whereas models that merge these two theories are highly successful over the entire phase diagram. Despite the simplicity of the Lipkin Hamiltonian, the lessons learned in this work will be useful for building an ab initio symmetry projected coupled cluster theory that we expect to be accurate in the weakly and strongly correlated limits, as well as the recoupling regime.

  18. Environmental assessment of nuclear projects in Canada - process, participation, lessons learned

    International Nuclear Information System (INIS)

    Underdown, G.A.; Brown, P.A.; Morrison, R.W.

    1995-01-01

    This paper documents public participation in decision-making for five cases of nuclear-based projects in Canada. Two cases involve the application of the Federal Environmental Assessment and Review Process (EARP), a formal, non-judicial process for public involvement in projects with a potential environmental impact. It is being applied to the development of new Uranium mines and the disposal of used nuclear fuels. The siting of radioactive waste facilities, generally unwanted by the communities, presents many difficult challenges which needs to be addressed before a project goes through the EARP process. An open, consultative, community-based approach to decision-making about siting is being applied in the three cases: Port Hope, Scarborough and Surrey. A number of lessons have been learned, the most important that there is a need to establish an acceptable process that includes 'getting the science right' on a project before attempting to find a site. The EARP, in most cases, provides a good mechanism for the sharing of information about a potential between the proponents and the public as long as there are no major unresolved contentious issues such as the unwanted siting of a waste facility in a particular community. 19 refs

  19. Applying lessons learned from the USAID family planning graduation experience to the GAVI graduation process.

    Science.gov (United States)

    Shen, Angela K; Farrell, Marguerite M; Vandenbroucke, Mary F; Fox, Elizabeth; Pablos-Mendez, Ariel

    2015-07-01

    As low income countries experience economic transition, characterized by rapid economic growth and increased government spending potential in health, they have increased fiscal space to support and sustain more of their own health programmes, decreasing need for donor development assistance. Phase out of external funds should be systematic and efforts towards this end should concentrate on government commitments towards country ownership and self-sustainability. The 2006 US Agency for International Development (USAID) family planning (FP) graduation strategy is one such example of a systematic phase-out approach. Triggers for graduation were based on pre-determined criteria and programme indicators. In 2011 the GAVI Alliance (formerly the Global Alliance for Vaccines and Immunizations) which primarily supports financing of new vaccines, established a graduation policy process. Countries whose gross national income per capita exceeds $1570 incrementally increase their co-financing of new vaccines over a 5-year period until they are no longer eligible to apply for new GAVI funding, although previously awarded support will continue. This article compares and contrasts the USAID and GAVI processes to apply lessons learned from the USAID FP graduation experience to the GAVI process. The findings of the review are 3-fold: (1) FP graduation plans served an important purpose by focusing on strategic needs across six graduation plan foci, facilitating graduation with pre-determined financial and technical benchmarks, (2) USAID sought to assure contraceptive security prior to graduation, phasing out of contraceptive donations first before phasing out from technical assistance in other programme areas and (3) USAID sought to sustain political support to assure financing of products and programmes continue after graduation. Improving sustainability more broadly beyond vaccine financing provides a more comprehensive approach to graduation. The USAID FP experience provides a

  20. Lessons learned in planning ALARA/health physics support for major nuclear power plant outages

    International Nuclear Information System (INIS)

    Gilman, T.R.; Lesinski, M.L.

    1987-01-01

    Although as low as reasonably achievable (ALARA)/health physics is viewed as necessary support for nuclear power plant outage work, it can be the last area to which attention is given in preparing for a large-scope outage. Inadequate lead times cause last-minute preparations resulting in delays in planned work. The Dresden Unit 3 Recirculation Piping Replacement Project is examined from a planning viewpoint. The attention that was given the various areas of a comprehensive ALARA/health physics program is examined, and approximate recommended lead times are discussed. The discussion will follow a chronological path from project inception to the beginning stages of outage work. Initially, the scope of work needs to be assessed by individuals familiar with similar projects of equivalent magnitude. Those individuals need to be health physics professionals who understand the particular utility and/or the site's way of doing business. They should also possess a good understanding of preferred industry practices

  1. Marine radioecology. Annual report 1996. Project plan 1997

    International Nuclear Information System (INIS)

    1997-06-01

    The project plan for the EKO-1 project states that 'the main aim of the EKO-1 project is to enable faster and better assessments to be made of the effects of releases of radionuclides into the marine environment'. To meet this goal the main parts of the project were defined as follows: Model work - Identifying parameters of main interest including estimating and validating the values of these parameters; Research - Field studies, environments typical for various Nordic regions, environments with special physical or chemical characteristics. Laboratory studies; Dissemination of information - Seminars, reports, articles. During the project period emphasis has also been put on quality issues concerning sampling and analysis. The project work has progressed in accordance with project plans in 1996 and within the set budget. In modelling a parameter sensitivity analysis was carried out for a radiological assessment model used for the prediction of doses to man from dumping of radioactive waste in the Kara Sea. Doses to man were found to be generally dominated by contributions from long-lived transuranic radionuclides (plutonium and americium) which associate readily with sediments. Sediment related processes and parameters show therefore high sensitivities, especially at long distances (e.g. Barents Sea). Within the EKO-1 project there has been emphasis on encouraging the Nordic aspect of sediment research in spite of the limitations set by nationally run sampling projects. The EKO-1 project has managed this by e.g.: Organizing exchange of samples for analysis links with the EKO-2.3 project ('Limnic systems'). (EG) 52 refs

  2. Watershed manipulation project: Field implementation plan for 1990-1992

    International Nuclear Information System (INIS)

    Erickson, H.; Narahara, A.M.; Rustad, L.E.; Mitchell, M.; Lee, J.

    1993-02-01

    The Bear Brook Watershed in Maine (BBWM) was established in 1986 at Lead Mountain, Maine as part of the Environmental Protection Agency's (EPA) Watershed Manipulation Project (WPM). The goals of the project are to: (1) assess the chemical response of a small upland forested watershed to increased loadings of SO4, (2) determine interactions among biogeochemical mechanisms controlling watershed response to acidic deposition, and (3) test the assumptions of the Direct/Delayed Response Programs (DDRP) computer models of watershed acidification. The document summarizes the field procedures used in the establishment and initial implementation of the plot- and catchment- scale activities at the BBWM, and outlines plans for 1990-02 project activities

  3. Definitions and Basic Concepts of Supply and Demand Analysis Used to Determine Market Equilibrium. Principles of Economics II (Microeconomics), Lesson Plan No. 6.

    Science.gov (United States)

    Chiu-Irion, Vicky

    Developed as part of a 37.5-hour microeconomics course, this lesson plan focuses on the concepts of supply and demand analysis used to determine market equilibrium. The objectives of the 50-minute lesson are to enable the student to: (1) explain how a demand schedule is derived from raw data; (2) graph a demand curve from the demand schedule; (3)…

  4. 25 CFR 170.415 - What is pre-project planning?

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false What is pre-project planning? 170.415 Section 170.415... PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities Long-Range Transportation Planning § 170.415 What is pre-project planning? (a) Pre-project planning is part of overall...

  5. Effects of Multiple Intelligences Supported Project-Based Learning on Students' Achievement Levels and Attitudes towards English Lesson

    Science.gov (United States)

    Bas, Gökhan; Beyhan, Ömer

    2010-01-01

    The aim of the research was to investigate the effects of multiple intelligences supported project-based learning and traditional foreign language-teaching environment on students' achievement and their attitude towards English lesson. The research was carried out in 2009-2010 education-instruction year in Karatli Sehit Sahin Yilmaz Elementary…

  6. Project-Based Learning Using Discussion and Lesson-Learned Methods via Social Media Model for Enhancing Problem Solving Skills

    Science.gov (United States)

    Jewpanich, Chaiwat; Piriyasurawong, Pallop

    2015-01-01

    This research aims to 1) develop the project-based learning using discussion and lesson-learned methods via social media model (PBL-DLL SoMe Model) used for enhancing problem solving skills of undergraduate in education student, and 2) evaluate the PBL-DLL SoMe Model used for enhancing problem solving skills of undergraduate in education student.…

  7. Planning construction of integrative schedule management for nuclear power project

    International Nuclear Information System (INIS)

    Zeng Zhenglin; Wang Wenying; Peng Fei

    2012-01-01

    This paper introduces the planning construction of integrative schedule management for Nuclear Power Project. It details schedule management system and the requirement of schedulers and the mode of three schedule management flats. And analysis it combing with the implementation of construction water and all special schedules before FCD to further propose the improving and researching direction for the integrative schedule management. (authors)

  8. Automated Procurement System (APS) revised project management plan (DS-03)

    Science.gov (United States)

    Murphy, Diane R.

    1995-01-01

    The Project Plan is the governing document for the implementation of the Automated Procurement System (APS). It includes a description of the proposed system, describes the work to be done, establishes a schedule of deliverables, and discusses the major standards and procedures to be followed.

  9. Fast Flux Test Facility, Sodium Storage Facility project-specific project management plan

    International Nuclear Information System (INIS)

    Shank, D.R.

    1994-01-01

    This Project-Specific Project Management Plan describes the project management methods and controls used by the WHC Projects Department to manage Project 03-F-031. The Sodium Storage Facility provides for storage of the 260,000 gallons of sodium presently in the FFTF Plant. The facility will accept the molten sodium transferred from the FFTF sodium systems, and store the sodium in a solid state under an inert cover gas until such time as a Sodium Reaction Facility is available for final disposal of the sodium

  10. Fast Flux Test Facility, Sodium Storage Facility project-specific project management plan

    Energy Technology Data Exchange (ETDEWEB)

    Shank, D.R.

    1994-12-29

    This Project-Specific Project Management Plan describes the project management methods and controls used by the WHC Projects Department to manage Project 03-F-031. The Sodium Storage Facility provides for storage of the 260,000 gallons of sodium presently in the FFTF Plant. The facility will accept the molten sodium transferred from the FFTF sodium systems, and store the sodium in a solid state under an inert cover gas until such time as a Sodium Reaction Facility is available for final disposal of the sodium.

  11. Spent nuclear fuel project high-level information management plan

    Energy Technology Data Exchange (ETDEWEB)

    Main, G.C.

    1996-09-13

    This document presents the results of the Spent Nuclear Fuel Project (SNFP) Information Management Planning Project (IMPP), a short-term project that identified information management (IM) issues and opportunities within the SNFP and outlined a high-level plan to address them. This high-level plan for the SNMFP IM focuses on specific examples from within the SNFP. The plan`s recommendations can be characterized in several ways. Some recommendations address specific challenges that the SNFP faces. Others form the basis for making smooth transitions in several important IM areas. Still others identify areas where further study and planning are indicated. The team`s knowledge of developments in the IM industry and at the Hanford Site were crucial in deciding where to recommend that the SNFP act and where they should wait for Site plans to be made. Because of the fast pace of the SNFP and demands on SNFP staff, input and interaction were primarily between the IMPP team and members of the SNFP Information Management Steering Committee (IMSC). Key input to the IMPP came from a workshop where IMSC members and their delegates developed a set of draft IM principles. These principles, described in Section 2, became the foundation for the recommendations found in the transition plan outlined in Section 5. Availability of SNFP staff was limited, so project documents were used as a basis for much of the work. The team, realizing that the status of the project and the environment are continually changing, tried to keep abreast of major developments since those documents were generated. To the extent possible, the information contained in this document is current as of the end of fiscal year (FY) 1995. Programs and organizations on the Hanford Site as a whole are trying to maximize their return on IM investments. They are coordinating IM activities and trying to leverage existing capabilities. However, the SNFP cannot just rely on Sitewide activities to meet its IM requirements

  12. Through Their Eyes: Lessons Learned Using Participatory Methods in Health Care Quality Improvement Projects.

    Science.gov (United States)

    Balbale, Salva N; Locatelli, Sara M; LaVela, Sherri L

    2016-08-01

    In this methodological article, we examine participatory methods in depth to demonstrate how these methods can be adopted for quality improvement (QI) projects in health care. We draw on existing literature and our QI initiatives in the Department of Veterans Affairs to discuss the application of photovoice and guided tours in QI efforts. We highlight lessons learned and several benefits of using participatory methods in this area. Using participatory methods, evaluators can engage patients, providers, and other stakeholders as partners to enhance care. Participant involvement helps yield actionable data that can be translated into improved care practices. Use of these methods also helps generate key insights to inform improvements that truly resonate with stakeholders. Using participatory methods is a valuable strategy to harness participant engagement and drive improvements that address individual needs. In applying these innovative methodologies, evaluators can transcend traditional approaches to uniquely support evaluations and improvements in health care. © The Author(s) 2015.

  13. Nevada Nuclear Waste Storage Investigations. FY 1979 project plan

    International Nuclear Information System (INIS)

    1979-03-01

    This document presents the management and cost for the Nevada Nuclear Waste Storage Investigations (disposal of high-level wastes at Nevada Test Site) and provides a complete description of the overall project, management structure, technical approach, and work breakdown structure. The document is organized into five major sections. Section I summarizes the history of the project and indicates a potential future course of action. FY 1979 project work is briefly described in Section II. Section III outlines the delegated responsibilities of all project management functions. A list of critical questions that guide the technical approach of the project are presented in Section IV. Section V contains subtask work plans which outline the work in detail for this fiscal year

  14. The effectiveness of Concept Mapping Content Representation Lesson Study (ComCoReLS) model to improve skills of Creating Physics Lesson Plan (CPLP) for pre-service physics teacher

    Science.gov (United States)

    Purwaningsih, E.; Suyatno; Wasis; Prahani, B. K.

    2018-03-01

    This research is aimed to analyse the effectiveness of ComCoReLS (Concept Mapping Content Representation Lesson Study) model towards the improvement skills of Creating Physics Lesson Plan (CPLP) for pre-service physics teacher. This research used one group pre-test and post-test design on 12 pre-service physics teacher at University of Malang State (Indonesia) in academic year 2016/2017. Data collection was conducted through test and interview. Skills of creating physics lesson plan for pre-service physics teacher measurement were conducted through Physics Lesson Plan Evaluation Sheet (PLPES). The data analysis technique was done by using paired t-test and n-gain. The CoMCoReLS model consists of 5 phases, including (1) Preparation, (2) Coaching, (3) Guided Practice, (4) Independent Practice, and (5) Evaluation. In the first, second, third and fifth phases are done at University of Malang State, while the fourth phase (Independent Practice) is done in SMAN 1 Singosari, SMAN 2 Malang, SMA Lab UM, MAN 3 Malang. The results showed that there was a significant increase in skills of creating physics lesson plan for pre-service physics teacher at α = 5% and n-gain average of high category. Thus, the ComCoReLS model is effective for improving skills of creating physics lesson plan for pre-service physics teacher.

  15. Uranium Mill Tailings Remedial Action Project Environmental Protection Implementation Plan

    International Nuclear Information System (INIS)

    Vollmer, A.T.

    1993-10-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Environmental Protection Implementation Plan (EPIP) has been prepared in accordance with the requirements of the US Department of Energy (DOE) Order 5400.1. The UMTRA EPIP covers the time period of November 9, 1993, through November 8, 1994. It will be updated annually. Its purpose is to provide management direction to ensure that the UMTRA Project is operated and managed in a manner that will protect, maintain, and where necessary, restore environmental quality, minimize potential threats to public health and the environment, and comply with environmental regulations and DOE policies. Contents of this report are: (1) general description of the UMTRA project environmental protection program; (2) notifications; (3) planning and reporting; (4) special programs; (5) environmental monitoring programs; (6) quality assurance and data verification; and (7) references

  16. Uranium Mill Tailings Remedial Action Project Environmental Protection Implementation Plan

    Energy Technology Data Exchange (ETDEWEB)

    Vollmer, A.T.

    1993-10-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Environmental Protection Implementation Plan (EPIP) has been prepared in accordance with the requirements of the US Department of Energy (DOE) Order 5400.1. The UMTRA EPIP covers the time period of November 9, 1993, through November 8, 1994. It will be updated annually. Its purpose is to provide management direction to ensure that the UMTRA Project is operated and managed in a manner that will protect, maintain, and where necessary, restore environmental quality, minimize potential threats to public health and the environment, and comply with environmental regulations and DOE policies. Contents of this report are: (1) general description of the UMTRA project environmental protection program; (2) notifications; (3) planning and reporting; (4) special programs; (5) environmental monitoring programs; (6) quality assurance and data verification; and (7) references.

  17. Project Management Plan for the Isotopes Facilities Deactivation Project at Oak Ridge National Laboratory

    International Nuclear Information System (INIS)

    1995-04-01

    The purpose of the Isotopes Facilities Deactivation Project (IFDP) is to place former isotopes production facilities at the Oak Ridge National Laboratory in a safe, stable, and environmentally sound condition suitable for an extended period of minimum surveillance and maintenance (S ampersand M) and as quickly and economically as possible. Implementation and completion of the deactivation project will further reduce the already small risks to the environment and to public safety and health. Furthermore, the project should result in significant S ampersand M cost savings in the future. The IFDP management plan has been prepared to document the project objectives, define organizational relationships and responsibilities, and outline the management control systems to be employed in the management of the project. The project has adopted a strategy to deactivate the simple facilities first, to reduce the scope of the project, and to gain experience before addressing more difficult facilities. A decision support system is being developed to identify those activities, that best promote the project mission and result in largest cost savings. The Work Plan for the Isotopes Facilities Deactivation Project at Oak Ridge National Laboratory (Energy Systems 1994) defines the project schedule, the cost estimate, and the technical approach for the project

  18. Social learning in transnational projectslessons from European territorial cooperation projects

    Directory of Open Access Journals (Sweden)

    Joern Harfst

    2015-04-01

    Full Text Available Old industrial regions in Europe have undergone radical changes in the last decades. After downsizing or closure of predominant industries such regions usually face big challenges concerning their economic, social and ecological futures. One chance to master this transformation process is the identification and sustainable utilisation of potentials left by industrial production. Utilisation of regional potentials, commonly categorized as natural and cultural potentials, was the aim of two transnational cooperation projects ReSource and SHIFT-X, which were both funded by European Union’s Development Fund (ERDF, INTERREG IVB. The paper shows how the involvement of research partners in the projects supported and facilitated joint learning effects and knowledge transfer between all project partners. It is argued that on the one hand such an approach offers important mutual benefits for partners, while on the other hand the realisation of such benefits remains a challenging task in a transnational collaboration. In declining industrial regions, especially when characterised by small- and medium-sized towns, the capacities to act are scarce and any outside intervention is often seen more as an unwanted factor that additionally stretches resources and provides little advantages for such regions. Therefore one of the main aims in transnational collaboration has to be the establishment of a trustful and committed working relation between all partners. The engagement in the projects has shown that the joint work between regional actors and the external academic partners can create important transnational learning effects for all involved; nevertheless it has to overcome certain reservations on all sides before innovative ways can be pursued successfully.

  19. FY 1991 project plan for the Hanford Environmental Dose Reconstruction Project, Phase 2

    International Nuclear Information System (INIS)

    1991-02-01

    Phase 1 of the Hanford Environmental Dose Reconstruction Project was designed to develop and demonstrate a method for estimating radiation doses people may have received from Hanford Site operations since 1944. The method researchers developed relied on a variety of measured and reconstructed data as input to a modular computer model that generates dose estimates and their uncertainties. As part of Phase 1, researchers used the reconstructed data and computer model to calculate preliminary dose estimates for populations in a limited geographical area and time period. Phase 2, now under way, is designed to evaluate the Phase 1 data and model and improve them to calculate more accurate and precise dose estimates. Phase 2 will also be used to obtain preliminary estimates of two categories of doses: for Native American tribes and for individuals included in the pilot phase of the Hanford Thyroid Disease Study (HTDS). TSP Directive 90-1 required HEDR staff to develop Phase 2 task plans for TSP approval. Draft task plans for Phase 2 were submitted to the TSP at the October 11--12, 1990 public meeting, and, after discussions of each activity and associated budget needs, the TSP directed HEDR staff to proceed with a slate of specific project activities for FY 1991 of Phase 2. This project plan contains detailed information about those activities. Phase 2 is expected to last 15--18 months. In mid-FY 1991, project activities and budget will be reevaluated to determine whether technical needs or priorities have changed. Separate from, but related to, this project plan, will be an integrated plan for the remainder of the project. HEDR staff will work with the TSP to map out a strategy that clearly describes ''end products'' for the project and the work necessary to complete them. This level of planning will provide a framework within which project decisions in Phases 2, 3, and 4 can be made

  20. Success Stories in Radiotherapy Development Projects: Lessons Learned from Radiotherapy Development Projects. Chapter 29

    International Nuclear Information System (INIS)

    Zubizarreta, E.; Van Der Merwe, D.

    2017-01-01

    This chapter examines some problems found to be common in the process of setting up, running or expanding radiotherapy facilities. The establishment of radiotherapy services is essential to consolidate any national cancer control plan. In other words, such a plan cannot exist without radiotherapy. The IAEA guidance on setting up a radiotherapy programme covering the clinical, medical physics, radiation protection and safety aspects gives an estimate of one teletherapy machine needed per million population]. The IAEA’s Directory of Radiotherapy Centres (DIRAC) shows that the number of megavoltage (MV) machines per million population varies from 8.2 in the United States of America to 5.5 in western Europe. There are still many countries without a single radiotherapy department, especially in Africa, and many others have very low coverage, e.g. up to one external beam radiotherapy machine to cover a population of 35 million, which is close to having no coverage. There are many possible reasons for this situation. In many low income countries, the combination of lower life expectancy, low income taxes, a small budget for public health, and unmet basic needs such as housing, prevention and/or treatment of infectious diseases (malaria, tuberculosis, human immunodeficiency virus (HIV), diarrhoea), drinkable water and sewerage makes the cancer control problem a lower priority. The indicators shown illustrate these points. Establishing a radiotherapy programme requires careful planning, including the requirement for successive phases. Resources should be available for designing, building, purchasing, maintaining and replacing equipment, and for providing training in its use. In the case of a first radiotherapy facility with basic staffing levels, there is not likely to be enough expertise to guide and oversee the process in many or all of these areas.