  1. Proposed Dunvegan hydroelectric project

    International Nuclear Information System (INIS)

    Houston, M.

    2001-01-01

    A new hydroelectric project is being proposed on the Peace River in the vicinity of Dunvegan, Alberta, by Glacier Power. The proposal calls for a low head, run-of-the-river hydroelectric power plant which would comprise a powerhouse containing 40 Kaplan turbines, a weir section, two fishways and a boat lock. The capacity of the generating plant would be 80 MW. As per established guidelines, the review process was initiated in July 1999 and is ongoing. Stakeholders, government agencies, both at the federal and provincial levels, are involved in the review process. The potential effects on the ice regime, fish passage and fish mortality and bank stability are the issues that have warranted the most attention to date. Scheduled to begin on October 2, 2001, a public hearing on the project has been arranged by the Alberta Energy and Utilities Board. The objective sought by Glacier Power is to have the project certified as being a green-power plant. Green power is defined as power produced from renewable sources with low environmental impact. The production of power with minimal environmental impacts is being encouraged in Alberta by Glacier Power, which sells power for a premium. 6 refs., 4 figs

  2. The JET Project (Design proposal)

    International Nuclear Information System (INIS)

    1976-01-01

    This proposal describes a large Tokamak experiment, which aims to study plasma behavior in conditions and dimensions approaching those required in a fusion reactor. The maximum plasma minor radius (a) is 1.25 m and the major radius R 0 is 2.96 m. An important feature is the flexibility to study, for plasma currents in the 1→3 MA range, a wide range of aspect ratios R 0 /a=2.37→5), toroidal magnetic fields (up to 3.6T), minor radii (0.6→1.25 m) and elongation ratios (b/a=1→3.5). The cost of the apparatus, power supplies, plasma heating equipment and specific diagnostics is estimated as 70.1 Muc (March 1975 prices, 1 uc=50 FB). The total construction phase cost including commissioning, buildings and staff is 135 Muc. These figures include an average overall contingency of 30%. The construction time for the project is estimated at 5 years and requires 370 professional man years of effort in the construction organisation with additional effort deployed by the Associated Laboratories in such areas as diagnostics and plasma heating. This design proposal is arranged as follows: The preface gives an introduction to the field of fusion research and relates JET to the European and international programmes. Chapter I is a concise summary of the design proposal, it describes the objectives of research with JET, and gives a brief description of: the apparatus; the cost and construction schedules; the proposed experimental programme and the possible modes of operation of the device. A detailed account of the project is given in the rest of the report of which Chapters IV and VII comprise the engineering design and the staff and cost estimates respectively

  3. The JET project (design proposal)

    International Nuclear Information System (INIS)

    1976-03-01

    This proposal describes a large Tokamak experiment, which aims to study plasma behavior in conditions and dimensions approaching those required in a fusion reactor. The maximum plasma minor radius (a) is 1.25m and the major radius (R 0 ) is 2.96m. An important feature is the flexibility to study, for plasma currents in the 1→3MA range, a wide range of aspect ratios (R 0 /a=2.37→5), toroidal magnetic fields (up to 3.6T), minor radii (0.6→1.25m) and elongation ratios (b/a=1→3.5). The cost of the apparatus, power supplies, plasma heating equipment and specific diagnostics is estimated as 70.1Muc (march 1975 prices, 1uc=50FB). The total construction phase cost including commissioning, buildings and staff is 135Muc. These figures include an average overall contingency of 30%. The construction time for the project is estimated at 5 years and requires 370 professional man years of effort in the construction organisation with additional effort deployed by the Associated Laboratories in such areas as diagnostics and plasma heating. This design proposal is arranged as follows: an introduction to the field of fusion research is given and relates JET to the European and international programmes; a concise summary of the design proposal describes the objectives of research with JET, and gives a brief description of the apparatus, the cost and construction schedules, the proposed experimental programme and the possible modes of operation of the device. A detailed account of the engineering design and the staff and cost estimates is presented

  4. Process-based project proposal risk management

    Directory of Open Access Journals (Sweden)

    Alok Kumar

    2016-12-01

    Full Text Available We all are aware of the organizational omnipresence. Projects within the organizations are ubiquitous too. Projects achieve their goals successfully if they are planned, scheduled, controlled and implemented well. The project lifecycle of initiating, planning, scheduling, controlling and implementing are very well-planned by project managers and the organizations. Successful projects have well-developed risk management plans to deal with situations impacting projects. Like any other organisation, a university does try to access funds for different purposes too. For such organisations, running a project is not the issue, rather getting a project proposal approved to fund a project is the key. Project proposal processing is done by the nodal office in every organisation. Usually, these nodal offices help in administration and submission of a project proposal for accessing funds. Seldom are these nodal project offices within the organizations facilitate a project proposal approval by proactively reaching out to the project managers. And as project managers prepare project proposals, little or no attention is made to prepare a project proposal risk plan so as to maximise project acquisition. Risk plans are submitted while preparing proposals but these risk plans cater to a requirement to address actual projects upon approval. Hence, a risk management plan for project proposal is either missing or very little effort is made to treat the risks inherent in project acquisition. This paper is an integral attempt to highlight the importance of risk treatment for project proposal stage as an extremely important step to preparing the risk management plan made for projects corresponding to their lifecycle phases. Several tools and techniques have been proposed in the paper to help and guide either the project owner (proposer or the main organisational unit responsible for project management. Development of tools and techniques to further enhance project

  5. Caribbean alternative energy programme project proposals

    International Nuclear Information System (INIS)

    1978-03-01

    This is the third report to follow the Project Group Meeting on ALTERNATIVE ENERGY RESOURCES, Barbados, September, 1977. It consists of summaries of projects proposals identified at the Meeting. The first two reports have been previously circulated. The first CSC(77)AER-1 covers the background, proceedings and recommendations resulting from the meeting as well as containing a brief outline of the project proposals. The country papers and technical papers that were presented at the meeting or served as background material, form the second report, CSC(77)AER-2. Copies of the first two reports can be obtained on request to the Commonwealth Science Council. Projects with potential for making significant progress in the short term have been marked with an asterisk

  6. North Central Project: Environment act proposal

    International Nuclear Information System (INIS)

    1992-05-01

    Manitoba Hydro proposes to construct a power transmission and distribution line system to connect 12 northern Manitoba communities to the utility's central power grid. The purpose of this North Central Project (NCP) is to provide reliable and unrestricted electric service to remote communities now largely receiving limited diesel-generated power. The NCP is composed of a 138-kV transmission line running ca 350 km from the Kelsey Generating Station, ca 160 km of 25-kV distribution lines, new transformer stations at four communities, upgraded internal distribution systems within the communities, removal of existing diesel stations and restoration of the sites, modifications and additions to the Kelsey switchyard, and a communications system. The NCP is described in detail, including proposed line routes and transformer station locations, rationales for site and route selection, projected impacts on the environment and local societies, and consultations with the communities to be affected. Potential impacts are expected to be modest, with few unmitigable adverse impacts and a number of potentially significant positive benefits. Impact management measures are proposed to prevent or mitigate adverse effects and to create or enhance positive impacts such as local employment of native peoples. 49 figs., 1 tab

  7. Closure plan for the proposed Millennium Project

    International Nuclear Information System (INIS)

    Tuttle, S.; Sisson, R.

    1999-01-01

    A $2.2 billion expansion of the current oil sands operation has been proposed by Suncor Energy Inc. The expansion would more than double the productive capacity of the present facility. As part of the application for this expansion, called Project Millennium, a comprehensive closure plan has been developed and filed by the Corporation. The Plan includes a systematic evaluation of the area to be developed, a description of the development activities planned, and the goals and objectives of the Corporation in re-establishing the landforms and ecosystems concurrently with running the operation. The Plan envisages surface contouring as early as practicable during the mine development, soil reconstruction, and re-establishment of vegetation, surface drainage and wetlands. The Corporation undertakes to monitor the performance of the reclaimed areas based on landform performance, the impact of chemical constituents on the landscape and ecosystem sustainability. An annual monitoring report assessing herbaceous vegetation growth, major species composition, tree and shrub survival and growth rate, groundwater conditions, amount of precipitation, the utility of constructed wetlands for treatment of reclamation area seepage and runoff waters, and wildlife population changes, will be prepared annually. A future research program associated with the Reclamation and Closure Plan will also examine the effectiveness of the reclamation drainage system as fish habitat, and the potential of the proposed end-pit lake to provide a viable aquatic ecosystem. 8 refs., 2 figs

  8. A proposed model for construction project management ...

    African Journals Online (AJOL)

    Keywords: Communication skills and leadership model, construction project ..... help a manager handle stress and break tension (Gido & Clements,. 2012: 331; Harrin .... production and management of projects, the higher the demand for.

  9. Natural Programming: Project Overview and Proposal

    National Research Council Canada - National Science Library

    Myers, Brad

    1998-01-01

    .... The Natural Programming Project is developing general principles, methods, and programming language designs that will significantly reduce the amount of learning and effort needed to write programs...

  10. A proposed model for construction project management ...

    African Journals Online (AJOL)

    Log in or Register to get access to full text downloads. ... (decision-making, problem-solving, listening, verbal competency, motivation, persuasion, ... Keywords: Communication skills and leadership model, construction project management, ...

  11. FY2011 Budget Proposals and Projections

    Science.gov (United States)

    2010-03-29

    and FY2009, and corporate income tax receipts fell even more sharply. Federal deficits, according to OMB and CBO projections, will likely be high...gains receipts can be especially sensitive to cyclical economic conditions. Asset values and corporate profits—and thus federal corporate income tax and

  12. Proposed Fermilab upgrade main injector project

    International Nuclear Information System (INIS)

    1992-04-01

    The US Department of Energy (DOE) proposes to construct and operate a ''Fermilab Main Injector'' (FMI), a 150 GeV proton injector accelerator, at the Fermi National Accelerator Laboratory (Fermilab) in Batavia, Illinois. The purpose and need for this action are given of this Environmental Assessment (EA). A description of the proposed FMI and construction activities are also given. The proposed FMI would be housed in an underground tunnel with a circumference of approximately 2.1 miles (3.4 kilometers), and the construction would affect approximately 135 acres of the 6,800 acre Fermilab site. The purpose of the proposed FMI is to construct and bring into operation a new 150 GeV proton injector accelerator. This addition to Fermilab's Tevatron would enable scientists to penetrate ever more deeply into the subatomic world through the detection of the super massive particles that can be created when a proton and antiproton collide head-on. The conversion of energy into matter in these collisions makes it possible to create particles that existed only an instant after the beginning of time. The proposed FMI would significantly extend the scientific reach of the Tevatron, the world's first superconducting accelerator and highest energy proton-antiproton collider

  13. 78 FR 39829 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2013-07-02

    ... DEPARTMENT OF THE TREASURY Internal Revenue Service Proposed Collection; Comment Request for Regulation Project AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice and request for comments...: Title: Reporting of Nonpayroll Withheld Tax Liabilities. OMB Number: 1545-1413. Regulation Project...

  14. Future perspectives - proposal for Oxford Physiome Project.

    Science.gov (United States)

    Oku, Yoshitaka

    2010-01-01

    The Physiome Project is an effort to understand living creatures using "analysis by synthesis" strategy, i.e., by reproducing their behaviors. In order to achieve its goal, sharing developed models between different computer languages and application programs to incorporate into integrated models is critical. To date, several XML-based markup languages has been developed for this purpose. However, source codes written with XML-based languages are very difficult to read and edit using text editors. An alternative way is to use an object-oriented meta-language, which can be translated to different computer languages and transplanted to different application programs. Object-oriented languages are suitable for describing structural organization by hierarchical classes and taking advantage of statistical properties to reduce the number of parameter while keeping the complexity of behaviors. Using object-oriented languages to describe each element and posting it to a public domain should be the next step to build up integrated models of the respiratory control system.

  15. Lunar scout: A Project Artemis proposal

    Science.gov (United States)

    The results of a student project to design a lunar lander in the context of a specifically defined mission are presented. The Lunar Scout will be launched from Cape Canaveral, Florida onboard a Delta II launch vehicle. The Delta II will carry the lander and its payload to a 1367 km orbit. Once it reaches that altitude, a STAR 48A solid rocket motor will kick the spacecraft into a lunar trajectory. After burnout of the lunar insertion motor, it will be jettisoned from the spacecraft. The flight from the earth to the moon will take approximately 106.4 hours. During this time the battery, which was fully charged prior to launch, will provide all power to the spacecraft. Every hour, the spacecraft will use its sun sensors and star trackers to update its position, maintain some stabilization and relay it back to earth using the dipole antennas. At the start of its lunar trajectory, the spacecraft will fire one of its 1.5 N thrusters to spin in at a very small rate. The main reason for this is to prevent one side of the spacecraft from overheating in the sun. When the spacecraft nears the moon, it will orient itself for the main retro burn. At an altitude of 200 km, a 4400 N bipropellant liquid thruster will ignite to slow the spacecraft. During the burn, the radar altimeter will be turned on to guide the spacecraft. The main retro rocket will slow the lander to 10 m/s at an approximate altitude of 40 km above the moon. From there, the space craft will use four 4.5 N hydrazine vertical thrusters and 1.5 N horizontal thrusters to guide the spacecraft to a soft landing. Once on the ground, the lander will shutoff the radar and attitude control systems. After the debris from the impact has settled, the six solar panels will be deployed to begin recharging the batteries and to power up the payload. The feedhorn antenna will then rotate to fix itself on the earth.

  16. 78 FR 23975 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2013-04-23

    ... DEPARTMENT OF THE TREASURY Internal Revenue Service Proposed Collection; Comment Request for Regulation Project AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice and request for comments... definition of a controlled foreign corporation, foreign base company income and foreign personal holding...

  17. 76 FR 43381 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2011-07-20

    ... DEPARTMENT OF THE TREASURY Internal Revenue Service Proposed Collection; Comment Request for Regulation Project AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice and request for comments... Financial Asset Securitization Investment Trusts; Real Estate Mortgage Investment Conduits (TD 9004 (final...

  18. 78 FR 39830 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2013-07-02

    ... DEPARTMENT OF THE TREASURY Internal Revenue Service Proposed Collection; Comment Request for Regulation Project AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice and request for comments... the Ozone Layer and on Products Containing Such Chemicals. OMB Number: 1545-1153. Regulation Project...

  19. 78 FR 70100 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2013-11-22

    ... DEPARTMENT OF THE TREASURY Internal Revenue Service Proposed Collection; Comment Request for Regulation Project AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice and request for comments... Nuclear Power Plant. OMB Number: 1545-1378. Regulation Project Number: TD 8580. Abstract: This regulation...

  20. 78 FR 76893 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2013-12-19

    ... DEPARTMENT OF THE TREASURY Internal Revenue Service Proposed Collection; Comment Request for Regulation Project AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice and request for comments.... Regulation Project Number: REG-209626-93 (TD 8796). Abstract: These regulations provide guidance concerning...

  1. 78 FR 45614 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2013-07-29

    ... DEPARTMENT OF THE TREASURY Internal Revenue Service Proposed Collection; Comment Request for Regulation Project AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice and request for comments... GST Deemed Allocations. OMB Number: 1545-1892. Regulation Project Number: REG-153841-02 (TD 9208...

  2. 78 FR 66424 - Proposed Collection: Comment Request for Regulation Project

    Science.gov (United States)

    2013-11-05

    ... DEPARTMENT OF THE TREASURY Internal Revenue Service [IA-33-92] Proposed Collection: Comment Request for Regulation Project AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice and... Project Number: IA-33-92. Abstract: Section 6050H of the Internal Revenue Code relates to the information...

  3. 78 FR 66423 - Proposed Collection: Comment Request for Regulation Project

    Science.gov (United States)

    2013-11-05

    ... DEPARTMENT OF THE TREASURY Internal Revenue Service [TD 9057, TD 9154, TD 9187] Proposed Collection: Comment Request for Regulation Project AGENCY: Internal Revenue Service (IRS), Treasury. ACTION... Rules. OMB Number: 1545-1774. Regulation Project Number: TD 9057, TD 9154, and TD 9187. Abstract: The...

  4. 75 FR 2932 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2010-01-19

    ... DEPARTMENT OF THE TREASURY Internal Revenue Service [REG-116664-01] RIN 1545-BC15 Proposed Collection; Comment Request for Regulation Project AGENCY: Internal Revenue Service (IRS), Treasury. ACTION.... OMB Number: 1545-1868. Regulation Project Number: REG-116664-01 (TD 9300 (final)). Abstract: This...

  5. 78 FR 76892 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2013-12-19

    ... DEPARTMENT OF THE TREASURY Internal Revenue Service Proposed Collection; Comment Request for Regulation Project AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice and request for comments... Liabilities for Pension Funding Purposes. OMB Number: 1545-2095. Regulation Project Number: REG-139236-07 (TD...

  6. 75 FR 2930 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2010-01-19

    ... DEPARTMENT OF THE TREASURY Internal Revenue Service [REG-106446-98] Proposed Collection; Comment Request for Regulation Project AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice and... From Joint and Several Liability. OMB Number: 1545-1719. Regulation Project Number: REG-106446-98...

  7. 76 FR 74117 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2011-11-30

    ... DEPARTMENT OF THE TREASURY Internal Revenue Service Proposed Collection; Comment Request for Regulation Project AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice and request for comments... Number: 1545-0817. Regulation Project Number: EE-28-78 (TD 7845). Abstract: Internal Revenue Code section...

  8. Power demand operation - environment and potential. Proposals for main project

    International Nuclear Information System (INIS)

    Wathne, M.

    1995-01-01

    This report discusses proposals for a main project on environmental and other problems arising when hydroelectric power stations supply energy at gigawatt levels. The project aims in particular to identify environmental problems where too little is known today for proper planning of this type of operation. The proposals emphasize the consequences which cannot be adequately analysed in terms of current techniques. These techniques presuppose steady state conditions. One proposal concerns market terms for power sales. Other proposals deal with hydrological data and uncertainty, capacity of watercourses, ice and temperature, aquatic eco-systems, erosion, supersaturation of water with air, flooding and dam breaks, impact on climate, inflow of fresh water in fjords and impact on algae. 33 refs., 4 tabs

  9. 100-N pilot project: Proposed consolidated groundwater monitoring program

    International Nuclear Information System (INIS)

    Borghese, J.V.; Hartman, M.J.; Lutrell, S.P.; Perkins, C.J.; Zoric, J.P.; Tindall, S.C.

    1996-11-01

    This report presents a proposed consolidated groundwater monitoring program for the 100-N Pilot Project. This program is the result of a cooperative effort between the Hanford Site contractors who monitor the groundwater beneath the 100-N Area. The consolidation of the groundwater monitoring programs is being proposed to minimize the cost, time, and effort necessary for groundwater monitoring in the 100-N Area, and to coordinate regulatory compliance activities. The integrity of the subprograms requirements remained intact during the consolidation effort. The purpose of this report is to present the proposed consolidated groundwater monitoring program and to summarize the process by which it was determined

  10. 78 FR 26694 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2013-05-07

    ... DEPARTMENT OF THE TREASURY Internal Revenue Service Proposed Collection; Comment Request for Regulation Project AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice and request for comments. SUMMARY: The Department of the Treasury, as part of its continuing effort to reduce paperwork and...

  11. 78 FR 28703 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2013-05-15

    ... requirements that must be met for an investment to qualify under Internal Revenue code section 936(d)(4) as an... DEPARTMENT OF THE TREASURY Internal Revenue Service Proposed Collection; Comment Request for Regulation Project AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice and request for comments...

  12. 75 FR 28331 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2010-05-20

    ... that must be met for an investment to qualify under Internal Revenue code section 936(d)(4) as an... DEPARTMENT OF THE TREASURY Internal Revenue Service [INTL-955-86] Proposed Collection; Comment Request for Regulation Project AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice and...

  13. Proposed Casey's Pond Improvement Project, Fermi National Accelerator Laboratory

    International Nuclear Information System (INIS)

    1995-05-01

    The U.S. Department of Energy (DOE) has prepared an Environmental Assessment (EA), evaluating the impacts associated with the proposed Casey's Pond Improvement Project at the Fermi National Accelerator Laboratory (Fermilab) in Batavia, Illinois. The improvement project would maximize the efficiency of the Fermilab Industrial Cooling Water (ICW) distribution system, which removes (via evaporation) the thermal load from experimental and other support equipment supporting the high energy physics program at Fermilab. The project would eliminate the risk of overheating during fixed target experiments, ensure that the Illinois Water Quality Standards are consistently achieved and provide needed additional water storage for fire protection. Based on the analysis in the EA, the DOE has determined that the proposed action does not constitute a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an Environmental Impact Statement is not required

  14. Proposed REDD+ project for the Sundarbans: Legal and institutional issues

    Directory of Open Access Journals (Sweden)

    Saiful Karim

    2013-07-01

    Full Text Available Sundarbans, a Ramsar and World Heritage site, is the largest single block of tidal halophytic mangrove forest in the world covering parts of Bangladesh and India. Natural mangroves were very common along the entire coast of Bangladesh. However, all other natural mangrove forests, including the Chakaria Sundarbans with 21,000 hectares of mangrove, have been cleared for shrimp cultivation. Against this backdrop, the Forest Department of Bangladesh has developed project design documents for a project called ‘Collaborative REDD+ Improved Forest Management (IFM Sundarbans Project’ (CRISP to save the only remaining natural mangrove forest of the country. This project, involving conservation of 412,000 ha of natural mangrove forests, is expected to generate, over a 30-year period, a total emissions reduction of about 6.4 million tons of CO2. However, the successful implementation of this project involves a number of critical legal and institutional issues. It may involve complex legal issues such as forest ownership, forest use rights, rights of local people and carbon rights. It may also involve institutional reforms. Ensuring good governance of the proposed project is very vital considering the failure of the Asian Development Bank (ADB funded and Bangladesh Forest Department managed ‘Sundarbans Biodiversity Conservation Project’. Considering this previous experience, this paper suggests that a comprehensive legal and institutional review and reform is needed for the successful implementation of the proposed CRISP project. This paper argues that without ensuring local people’s rights and their participation, no project can be successful in the Sundarbans. Moreover, corruption of local and international officials may be a serious hurdle in the successful implementation of the project.

  15. Draft Environmental Impact Statement: Proposed Tenaska, Washington II Generation Project

    International Nuclear Information System (INIS)

    1993-08-01

    BPA is considering whether to purchase electrical power from a proposed privately-owned combustion-turbine electrical generation plant in Washington. The plant would be fired by natural gas and would use combined-cycle technology to generate 240 average megawatts (aMW) of energy. The plant would be developed, owned, and operated by Tenaska Power Partners, Inc. The project would be located about 19 kilometers (12 miles) southeast of downtown Tacoma in the Frederickson Industrial Area, Pierce County. The proposed plant would occupy about half of a 6.4-hectare (16-acre) parcel and would be consistent with the industrial character of its surroundings. The proposed site is currently undeveloped and zoned for industrial use by the county. Main environmental concerns identified in the scoping process and evaluated in the Environmental Impact Statement (EIS) include: potential air quality impacts such as emissions and their contribution to the ''greenhouse'' effect; potential health and safety impacts, such as nuisance odors, plant safety, visibility and heat-emission systems which may affect low-flying planes and potential health effects of electric and magnetic fields, and potential water quality impacts such as the amount of wastewater to be discharged, the source and amount of water required for plant operation. These and other issues are discussed in detail in the EIS. The proposed project already includes many features designed to reduce environmental impacts. Based on investigations performed for the EIS, no significant unavoidable adverse environmental impacts associated with the proposed project were identified, and no evidence emerged to suggest that the proposed action is particularly controversial. The EIS is being mailed to numerous agencies, groups, and individuals. There will be a 45-day comment period, during which a Public Hearing will be held

  16. Environmental assessment -- Proposed neutrino beams at the Main Injector project

    International Nuclear Information System (INIS)

    1997-12-01

    The US Department of Energy (DOE) proposes to build a beamline on the Fermi National Accelerator Laboratory (Fermilab) site to accommodate an experimental research program in neutrino physics. The proposed action, called Neutrino Beams at the Main Injector (NuMI), is to design, construct, operate and decommission a facility for producing and studying a high flux beam of neutrinos in the energy range of 1 to 40 GeV (1 GeV is one billion or 10 9 electron volts). The proposed facility would initially be dedicated to two experiments, COSMOS (Cosmologically Significant Mass Oscillations) and MINOS (Main Injector Neutrino Oscillation Search). The neutrino beam would pass underground from Fermilab to northern Minnesota. A tunnel would not be built in this intervening region because the neutrinos easily pass through the earth, not interacting, similar to the way that light passes through a pane of glass. The beam is pointed towards the MINOS detector in the Soudan Underground Laboratory in Minnesota. Thus, the proposed project also includes construction, operation and decommissioning of the facility located in the Soudan Underground Laboratory in Minnesota that houses this MINOS detector. This environmental assessment (EA) has been prepared by the US Department of Energy (DOE) in accordance with the DOE's National Environmental Policy Act (NEPA) Implementing Procedures (10 CFR 1021). This EA documents DOE's evaluation of potential environmental impacts associated with the proposed construction and operation of NuMI at Fermilab and its far detector facility located in the Soudan Underground Laboratory in Minnesota. Any future use of the facilities on the Fermilab site would require the administrative approval of the Director of Fermilab and would undergo a separate NEPA review. Fermilab is a Federal high-energy physics research laboratory in Batavia, Illinois operated on behalf of the DOE by Universities Research Association, Inc

  17. Environmental assessment -- Proposed neutrino beams at the Main Injector project

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-12-01

    The US Department of Energy (DOE) proposes to build a beamline on the Fermi National Accelerator Laboratory (Fermilab) site to accommodate an experimental research program in neutrino physics. The proposed action, called Neutrino Beams at the Main Injector (NuMI), is to design, construct, operate and decommission a facility for producing and studying a high flux beam of neutrinos in the energy range of 1 to 40 GeV (1 GeV is one billion or 10{sup 9} electron volts). The proposed facility would initially be dedicated to two experiments, COSMOS (Cosmologically Significant Mass Oscillations) and MINOS (Main Injector Neutrino Oscillation Search). The neutrino beam would pass underground from Fermilab to northern Minnesota. A tunnel would not be built in this intervening region because the neutrinos easily pass through the earth, not interacting, similar to the way that light passes through a pane of glass. The beam is pointed towards the MINOS detector in the Soudan Underground Laboratory in Minnesota. Thus, the proposed project also includes construction, operation and decommissioning of the facility located in the Soudan Underground Laboratory in Minnesota that houses this MINOS detector. This environmental assessment (EA) has been prepared by the US Department of Energy (DOE) in accordance with the DOE`s National Environmental Policy Act (NEPA) Implementing Procedures (10 CFR 1021). This EA documents DOE`s evaluation of potential environmental impacts associated with the proposed construction and operation of NuMI at Fermilab and its far detector facility located in the Soudan Underground Laboratory in Minnesota. Any future use of the facilities on the Fermilab site would require the administrative approval of the Director of Fermilab and would undergo a separate NEPA review. Fermilab is a Federal high-energy physics research laboratory in Batavia, Illinois operated on behalf of the DOE by Universities Research Association, Inc.

  18. The studsvik BNCT project: structure and the proposed protocols

    International Nuclear Information System (INIS)

    Capala, J.; Stenstam, B.H.; Skoeld, K.; Henriksson, R.; Salford, L.; Carlsson, J.

    2000-01-01

    The BNCT facility at Studsvik is now ready for clinical trials. Scientific operations of the Studsvik BNCT project are overseen by the Scientific Advisory Board comprised of representatives of all major universities in Sweden. Furthermore, special task groups for clinical and preclinical studies have been formed to facilitate collaboration with academia and to assure the quality of the research. Proposed clinical Phase II trials for glioblastoma are sponsored by the Swedish National Neuro-Oncology Group and, initially, will involve two protocols: Protocol no.1. BNCT for glioblastoma patients who have not received any therapy other than surgery (including stereotactic biopsy only). Protocol no.2. BNCT as a palliative treatment for patients with recurrent glioblastoma following conventional therapies or BNCT. In both protocols, BPA, administered by a 6 hour i.v. infusion, will be used as the boron delivery agent. (author)

  19. Proposal for Land Consolidation Project Solutions for Selected Problem Areas

    Science.gov (United States)

    Wojcik-Len, Justyna; Strek, Zanna

    2017-12-01

    One of the economic tools for supporting agricultural policy are the activities implemented under the Rural Development Program (RDP). By encouraging agricultural activities and creating equal opportunities for development of farms, among others in areas with unfavourable environmental conditions characterized by low productivity of soils exposed to degradation, decision makers can contribute to improving the spatial structure of rural areas. In Poland, one of the major concerns are agricultural problem areas (regions). In view of this situation, the aim of this article was to characterize the problem areas in question and propose land consolidation project solutions for selected fragments of those areas. This paper presents the results of a review of literature and an analysis of geodetic and cartographic data regarding the problem areas. The process of land consolidation, which is one of the technical and legal instruments supporting the development of rural areas, was characterized. The study allowed the present authors to establish criteria for selecting agricultural problem areas for land consolidation. To develop a proposal for rational management of the problem areas, key general criteria (location, topography, soil quality and usefulness) and specific criteria were defined and assigned weights. A conception of alternative development of the agricultural problem areas was created as part of a land consolidation project. The results were used to create a methodology for the development of agricultural problem areas to be employed during land consolidation in rural areas. Every agricultural space includes areas with unfavourable environmental and soil conditions determined by natural or anthropogenic factors. Development of agricultural problem areas through land consolidation should take into account the specific functions assigned to these areas in land use plans, as well as to comply with legal regulations.

  20. 76 FR 6153 - Supplemental Environmental Impact Statement for the Proposed Campo Regional Landfill Project on...

    Science.gov (United States)

    2011-02-03

    ... for the Proposed Campo Regional Landfill Project on the Campo Indian Reservation, San Diego County, CA... proposed Campo Regional Landfill Project (Proposed Action) to be located on the Campo Indian Reservation... Landfill Project (Proposed Action). There is no Federal action of amended lease and amended sublease...

  1. A Proposal to Build an Education Research and Development Program: The Kamehameha Early Education Project Proposal. Technical Report #3.

    Science.gov (United States)

    Gallimore, Ronald; And Others

    This report summarizes the programmatic features of a proposal for the Kamehameha Early Education Project (KEEP), a program aimed at the development, demonstration, and dissemination of methods for improving the education of Hawaiian and part-Hawaiian children. A brief description of the proposed project goals, structure, organization, and…

  2. 76 FR 13423 - Notice of Submission of Proposed Information Collection to OMB; Contractor's Requisition-Project...

    Science.gov (United States)

    2011-03-11

    ... Proposed Information Collection to OMB; Contractor's Requisition--Project Mortgages AGENCY: Office of the.... Contractor's monthly application for distribution of insured mortgage proceeds for construction costs... Following Information Title of Proposal: Contractor's Requisition--Project Mortgages. OMB Approval Number...

  3. A Proposal for a Mindset of a Project Manager

    DEFF Research Database (Denmark)

    Eriksson, Joakim; Hansen, Claus Thorp

    2008-01-01

    and clarification of decision situations and consequences is rarely used in practice and structured reasoning about project and product performance when making decisions is also rare. In order to enhance the project managers’ understanding of decision-making in product development projects, the objective......A company’s product strategy and its management of the product development process have been found to be key factors for a product’s success on the market [1]. Project managers of development projects need support to make process decisions and defining goals that are consistent with the business....... In product development projects it is desirable to reduce the level of uncertainty in order to make decisions without having to redo them later in the project resulting in longer lead time and higher costs. It is the project manager’s responsibility to manage this uncertainty in a complex ever...

  4. 77 FR 26818 - Notice of Limitation on Claims Against Proposed Public Transportation Projects

    Science.gov (United States)

    2012-05-07

    ... DEPARTMENT OF TRANSPORTATION Federal Transit Administration Notice of Limitation on Claims Against Proposed Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice... public transportation projects listed below. The actions on these projects, as well as the laws under...

  5. Weaving Social Media into a Business Proposal Project

    Science.gov (United States)

    Li, Xiaoli

    2012-01-01

    Given that students are enthusiastic about social media or even have expertise in some social media tools, the author decided to design a class project in her Writing for Careers (Business Communication) class that integrates social media in terms of content and project management. This article intends to describe such a class project design as…

  6. Proposed modifications to the Lower Mokelumne River Project, California: FERC Project No. 2916-004

    International Nuclear Information System (INIS)

    1993-11-01

    This final environmental impact statement (FEIS) has been prepared for the Federal Energy Regulatory Commission (Commission) to consider modifications to the existing Lower Mokelumne River Project (LMRP) (FERC Project No. 2916-004) in California. Chinook salmon and steelhead trout populations in the lower Mokelumne River have experienced recent declines and fish kills associated, in part, with discharges from Camanche Dam. The California Department of Fish and Game and the California Sportfishing Protection Alliance have asked the Commission to investigate and correct these problems. A wide range of different mitigation actions has been proposed by parties participating in the scoping of this proceeding, and staff has evaluated these proposed actions in this assessment. The staff is recommending a combination of flow and non-flow modifications to the existing license, including new minimum flow and minimum pool elevation requirements at Camanche Reservoir, ramping rates on dam releases, interim attraction and out-migrant spike flows, instream habitat improvements, and a series of studies and monitoring to determine feasible means for solving off-site fish passage problems

  7. 75 FR 30905 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2010-06-02

    ... Project Number: LR-209-76 (T.D. 7941). Abstract: Internal Revenue Code section 6324A permits the executor... of a bond or personal liability if an election under section 6166 was made and the executor files an...

  8. 78 FR 39725 - Grenada Lake Hydroelectric Project; Notice Of Proposed Restricted Service List for a Programmatic...

    Science.gov (United States)

    2013-07-02

    ...-001--Mississippi] Grenada Lake Hydroelectric Project; Notice Of Proposed Restricted Service List for a... license for the proposed Grenada Lake Hydroelectric Project No. 13702. The Programmatic Agreement, when... Grenada Lake Hydroelectric Project, the U.S. Army Corps of Engineers, the Choctaw Nation of Oklahoma, the...

  9. 36 CFR 1010.14 - Review of proposals by project applicants.

    Science.gov (United States)

    2010-07-01

    ...) With respect to each project proposed for consideration for which the NEPA Compliance Coordinator... the scope and content of the final EA. (e) With respect to each project proposed for consideration for... Trust and who certify that they have no financial or other interest in the outcome of the project, and...

  10. Environmental assessment report on proposed Yeelirrie uranium project

    International Nuclear Information System (INIS)

    1979-01-01

    In accordance with Government requirements, Western Mining Corporation Ltd. has prepared a Draft Environmental Impact Statement/Environmental Review and Management Programme for its proposed uranium mine development at Yeelirrie, Western Australia. This report includes an outline of the proposal, an enviromental assessment, recommendations by the Environmental Protection Authority made after consideration of the Company's draft statement and a review of public and State Government Departmental Submissions received on the Yeelirrie EIS/ERMP

  11. Proposal for a project agreement with ISTC - Crystal Clear Collaboration

    CERN Document Server

    2001-01-01

    This document concerns a project agreement with the ISTC entitled "Development of the Detector Production Technology for a New Generation of Positron Emission Tomographs to be used in Medecine and Pharmacology" to be executed in co-operation with the Crystal Clear Collaboration. For the reasons set out in this document, the Finance Committee is invited to agree to the negotiation of a project agreement with ISTC for a total amount of 775 000 US dollars. The European Union party in ISTC will co-fund the project up to a total of 525 000 US dollars. CERN's contribution will not exceed 250 000 US dollars. At the present rate of exchange this is equivalent to approximately 430 000 Swiss francs

  12. Proposed purchasing, employment and training policies for northern projects

    International Nuclear Information System (INIS)

    1991-09-01

    Manitoba Hydro is about to embark on a major construction project in the northern part of the province. Important considerations involved in this project include purchasing the necessary materials, products, and services, and employing a suitable work force. An outline is presented of draft policies being considered by Manitoba Hydro to enhance northern-aboriginal and northern participation in its future development projects in northern Manitoba. The policies are presented in four sections: purchasing for northern construction and operation activities; training and employment for construction of a generation station and expansion of a converter station; training and employment for construction of a major north-south transmission line; and training and employment for northern operations and maintenance work at existing facilities. Aspects of these policies include giving preference in purchasing to northern and aboriginal businesses, training initiatives and employee counselling for aboriginal employees, and hiring preferences directed toward northern aboriginals and northern residents

  13. 75 FR 44851 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2010-07-29

    ... Reduction Act of 1995, Public Law 104-13 (44 U.S.C. 3506(c)(2)(A)). Currently, the IRS is soliciting... Income and Earnings and Profits under the Dollar Approximate Separate Transactions Method of Accounting... Transactions Method of Accounting (DASTM). OMB Number: 1545-1051. Regulation Project Number: INTL-29-91...

  14. 78 FR 24312 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2013-04-24

    ... 1995, Public Law 104-13 (44 U.S.C. 3506(c)(2)(A)). Currently, the IRS is soliciting comments concerning, Changes in Accounting Periods. DATES: Written comments should be received on or before June 24, 2013 to be... in Accounting Periods. OMB Number: 1545-1748. Regulation Project Number: TD 8996. Abstract: Section 1...

  15. 75 FR 33671 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2010-06-14

    ... Reduction Act of 1995, Public Law 104-13 (44 U.S.C. 3506(c)(2)(A)). Currently, the IRS is soliciting comments concerning an existing final regulation, REG-106917-99 (TD 8996), Changes in Accounting Periods... INFORMATION: Title: Changes in Accounting Periods. OMB Number: 1545-1748. Regulation Project Number: REG...

  16. 75 FR 53023 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2010-08-30

    ... Reduction Act of 1995, Public Law 104-13 (44 U.S.C. 3506(c)(2)(A)). Currently, the IRS is soliciting comments concerning an existing final regulation, CO-99-91 (TD 8490), Limitations on Corporate Net...: Limitations on Corporate Net Operating Loss. OMB Number: 1545-1345. Regulation Project Number: CO-99-91...

  17. 77 FR 57196 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2012-09-17

    ... 1995, Public Law 104-13 (44 U.S.C. 3506(c)(2)(A)). Currently, the IRS is soliciting comments concerning limitations on corporate net operating loss carryforwards. DATES: Written comments should be received on or... Corporate Net Operating Loss Carryforwards. OMB Number: 1545-1260. Regulation Project Number: CO-62-89...

  18. 75 FR 11997 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2010-03-12

    ... Paperwork Reduction Act of 1995, Public Law 104-13 (44 U.S.C. 3506(c)(2)(A)). Currently, the IRS is... Trust as Part of an Estate (Sec. 1.645-1). DATES: Written comments should be received on or before May... INFORMATION: Title: Election to Treat Trust as Part of an Estate. OMB Number: 1545-1578. Regulation Project...

  19. 77 FR 31912 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2012-05-30

    ... determining arbitrage profits. Under FI-7-94, the scope of interest rate hedging transactions covered by the... arbitrage restrictions on tax-exempt bonds. DATES: Written comments should be received on or before July 30...: Arbitrage Restrictions on Tax-Exempt Bonds. OMB Number: 1545-1347. Regulation Project Numbers: FI-36-92; FI...

  20. 78 FR 22036 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2013-04-12

    ... fair market value of the underlying property before and after the donation and (2) the conservation... qualified conservation contributions (Sec. 1.170A-14). DATES: Written comments should be received on or... INFORMATION: Title: Qualified Conservation Contributions. OMB Number: 1545-0763. Regulation Project Number: TD...

  1. 76 FR 55741 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2011-09-08

    ... 1995, Public Law 104-13 (44 U.S.C. 3506(c)(2)(A)). Currently, the IRS is soliciting comments concerning Qualified Separate Lines of Business. DATES: Written comments should be received on or before November 7...: Title: Qualified Separate Lines of Business. OMB Number: 1545-1221. Regulation Project Number: EE-147-87...

  2. 76 FR 34807 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2011-06-14

    ... 1995, Public Law 104-13(44 U.S.C. 3506(c)(2)(A)). Currently, the IRS is soliciting comments concerning electing small business trusts. DATES: Written comments should be received on or before August 15, 2011to...: Electing Small Business Trusts. OMB Number: 1545-1591. Regulation Project Number: REG-251701-96 (TD 8894...

  3. 76 FR 21427 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2011-04-15

    ... other administrative provisions of special application to manufacturers and retailers excise taxes... Manufacturers and Retailers Excise Taxes. OMB Number: 1545-0723. Regulation Project Number: T.D. 8043. Abstract... regulation. Type of Review: Extension of a currently approved collection. Affected Public: Individuals...

  4. 78 FR 41192 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2013-07-09

    ... definitions; excise tax returns. DATES: Written comments should be received on or before September 9, 2013 to be assured of consideration. ADDRESSES: Direct all written comments to Yvette Lawrence, Internal... definitions; excise tax returns. OMB Number: 1545-2193. Regulation Project Number: REG-155087-05. Abstract...

  5. 77 FR 3840 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2012-01-25

    ... consideration. ADDRESSES: Direct all written comments to Yvette Lawrence, Internal Revenue Service, room 6129...-1353. Regulation Project Number: FI-189-84. Abstract: These regulations provide definitions, reporting requirements, elections, and general rules relating to the tax treatment of debt instruments with original...

  6. 76 FR 69329 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2011-11-08

    ... collection requirements related to Tax Shelter Regulations. DATES: Written comments should be received on or before January 9, 2012 to be assured of consideration. ADDRESSES: Direct all written comments to Yvette B... . SUPPLEMENTARY INFORMATION: Title: Tax Shelter Disclosure Regulations. OMB Number: 1545-1685. Regulation Project...

  7. 78 FR 8222 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2013-02-05

    ... Minimum Tax--Tax Benefit Rule. DATES: Written comments should be received on or before April 8, 2013 to be assured of consideration. ADDRESSES: Direct all written comments to Yvette Lawrence, Internal Revenue... Tax--Tax Benefit Rule. OMB Number: 1545-1093. Regulation Project Number: IA-56-87 and IA- 53-87 (TD...

  8. 76 FR 25773 - Notice of Limitation on Claims Against Proposed Public Transportation Project

    Science.gov (United States)

    2011-05-05

    ... Proposed Public Transportation Project AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice of... announced herein for the listed public transportation project will be barred unless the claim is filed on or... approvals for the public transportation project listed below. The actions on this project, as well as the...

  9. 77 FR 6624 - Notice of Limitation on Claims Against Proposed Public Transportation Projects

    Science.gov (United States)

    2012-02-08

    ... Proposed Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice... for the listed public transportation project will be barred unless the claim is filed on or before... approvals for the public transportation projects listed below. The actions on these projects, as well as the...

  10. 76 FR 35939 - Notice of Limitation on Claims Against Proposed Public Transportation Projects

    Science.gov (United States)

    2011-06-20

    ... Proposed Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice... announced herein for the listed public transportation project will be barred unless the claim is filed on or... approvals for the public transportation projects listed below. The actions on these projects, as well as the...

  11. 76 FR 60963 - Notice of Limitation on Claims Against Proposed Public Transportation Projects

    Science.gov (United States)

    2011-09-30

    ... Proposed Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice... announced herein for the listed public transportation project will be barred unless the claim is filed on or... the public transportation projects listed below. The actions on these projects, as well as the laws...

  12. 76 FR 19522 - Notice of Limitation on Claims Against Proposed Public Transportation Projects

    Science.gov (United States)

    2011-04-07

    ... Proposed Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice... herein for the listed public transportation projects will be barred unless the claim is filed on or... approvals for the public transportation projects listed below. The actions on these projects, as well as the...

  13. 76 FR 72746 - Notice of Limitation on Claims Against Proposed Public Transportation Projects

    Science.gov (United States)

    2011-11-25

    ... Proposed Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice... for the listed public transportation project will be barred unless the claim is filed on or before May... approvals for the public transportation projects listed below. The actions on these projects, as well as the...

  14. 5 CFR 470.305 - Submission of proposals for demonstration projects.

    Science.gov (United States)

    2010-01-01

    ... time on submitted proposals until comparisons can be made with other existing projects or with project... projects. 470.305 Section 470.305 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PERSONNEL MANAGEMENT RESEARCH PROGRAMS AND DEMONSTRATIONS PROJECTS Regulatory Requirements...

  15. 76 FR 78332 - Amended Notice of Limitation on Claims Against Proposed Public Transportation Project

    Science.gov (United States)

    2011-12-16

    ... DEPARTMENT OF TRANSPORTATION Federal Transit Administration Amended Notice of Limitation on Claims Against Proposed Public Transportation Project AGENCY: Federal Transit Administration (FTA), DOT. ACTION... actions announced herein for the listed public transportation project will be barred unless the claim is...

  16. Developing an online support tool to assist students in higher education with project proposals

    OpenAIRE

    Haji Suhaili, Wida Susanty

    2015-01-01

    The research presented in this thesis investigates ways to assist students with writing their project proposals. There is limited literature on the problems students have when writing project proposals in Higher Education. Particularly most of the literature has concentrated on the writing aspects, rhetorical aspects and structure of a scientific article. Even though various studies on assessment of undergraduate individual and group project works have been done, the project pr...

  17. Proposed OPEG Namakan River hydro development project draft environmental report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2010-07-01

    The Ojibway Power and Energy Group (OPEG) is planning on installing a hydroelectric generating facility along the Namakan River at High Falls in Canada. In order the meet the different requirements in terms of environmental assessment for such a project, the group prepared an environmental report. The aim of this paper is to present the comments of the Quetico Foundation, a charity whose aim is to protect wilderness class parks. The foundation found both general and discipline-by-discipline deficiencies in OPEG's environmental report. All the deficiencies the Foundation observed are listed in this report, general deficiencies, and specific deficiencies concerning fisheries, terrestrial ecology, hydrology and socio-economic impacts. The Quetico Foundation demonstrated that a significant number of deficiencies are found in the OPEG environmental report, suggesting that they did not fully understand the potential long term impacts of their project and that further study should be undertaken.

  18. A statistical proposal for environmental impact assessment of development projects

    International Nuclear Information System (INIS)

    Plazas C, Julian A; De J Lema T, Alvaro; Leon P, Juan Diego

    2009-01-01

    Environmental impact assessment of development projects is a fundamental process, which main goal is to avoid that their construction and functioning, lead to serious and negative consequences on the environment. Some of the most important limitations of the models employed to assess environmental impacts, are the subjectivity of its parameters and weights, and the multicolineality among the variables, which represent high quantities of similar information. This work presents a multivariate statistical-based method that tries to diminish such limitations. For this purpose, environmental impact assessment, is valuated through different environmental impact attributes and environmental elements, synthesized in an environmental quality index (ICA in Spanish). ICA can be applied at different levels, such as at a project level, or applied only at a partial level on one or some environmental components.

  19. Review of Interactive Video--Romanian Project Proposal

    Science.gov (United States)

    Onita, Mihai; Petan, Sorin; Vasiu, Radu

    2016-01-01

    In the recent years, the globalization and massification of video education offer involved more and more eLearning scenarios within universities. This article refers to interactive video and proposes an overview of it. We analyze the background information, regarding the eLearning campus used in virtual universities around the world, the MOOC…

  20. 78 FR 8225 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2013-02-05

    ... submitted for renewal purposes only. Type of Review: Extension of a currently approved collection. Affected... respondent burden, invites the general public and other Federal agencies to take this opportunity to comment on proposed and/or continuing information collections, as required by the Paperwork Reduction Act of...

  1. 75 FR 60507 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2010-09-30

    ..., or a property transfer (or transfer of the right to use property) a fair market value. Current... opportunity to comment on proposed and/or continuing information collections, as required by the Paperwork... Service, room 6129, 1111 Constitution Avenue, NW., Washington, DC 20224. FOR FURTHER INFORMATION CONTACT...

  2. 76 FR 9406 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2011-02-17

    ... comments concerning the existing proposed regulations, REG-100194-10, Specified Tax Return Preparers Required to File Individual Income Tax Returns Using Magnetic Media--Taxpayer Choice Statements. DATES...: Direct all written comments to Yvette Lawrence, Internal Revenue Service, Room 6129, 1111 Constitution...

  3. The Saskatchewan Environmental Assessment Act Guide to Proposal Development : oil and natural gas projects

    International Nuclear Information System (INIS)

    1999-02-01

    The manner in which requests for review of oil and natural gas projects are to be provided under the Environmental Assessment Act in Saskatchewan is described. The provisions of the Guide apply to all seismic projects on private or Crown lands, all drilling projects, flowline projects, access routes and production facilities on any land, except where the project is on cultivated land where it does not interfere with water bodies or endangered species. It also applies to any project that has the potential to meet the definition of 'development' under the Environmental Assessment Act. Basically, the following information is required for all proposals: (1) project description, (2) project evaluation, (3) description of proposed waste management practices, and (4) description of the proposed environmental monitoring. 4 refs

  4. Advanced Stellar Compass - Proposal for the LunARSat project

    DEFF Research Database (Denmark)

    Betto, Maurizio; Jørgensen, John Leif; Kilsgaard, Søren

    1998-01-01

    request for proposal (r.f.p.) for the LunARSat star tracker.The Advanced Stellar Compass (ASC) is a highly advanced and autonomous Stellar Reference Unit designed, developed and produced by the Space Instrumentation Group of the Department of Automation of the Technical University of Denmark.The document...... is structured as follows. First we present the ASC - heritage, system description, performance and the calibration procedures. In section 3 the mechanical and electrical interfaces are given. In section 4 and 5 we address issues like manufacturing, transportation and storage and to conclude, in sect. 6, we...

  5. 75 FR 23798 - Environmental Assessment Prepared for Proposed Cape Wind Energy Project in Nantucket Sound...

    Science.gov (United States)

    2010-05-04

    ... Proposed Cape Wind Energy Project in Nantucket Sound, Offshore Massachusetts AGENCY: Minerals Management... Energy Project proposed for Nantucket Sound, offshore Massachusetts. On January 16, 2009, the MMS... construct a wind power facility on Horseshoe Shoal in Nantucket Sound, offshore Massachusetts. Following the...

  6. 75 FR 10500 - Environmental Assessment Prepared for Proposed Cape Wind Energy Project in Nantucket Sound, MA

    Science.gov (United States)

    2010-03-08

    ... Proposed Cape Wind Energy Project in Nantucket Sound, MA AGENCY: Minerals Management Service (MMS... MMS for the Cape Wind Energy Project proposed for Nantucket Sound, Massachusetts. On January 16, 2009... facility on Horseshoe Shoal in Nantucket Sound, Massachusetts. Following the adoption of the Energy Policy...

  7. 76 FR 55155 - Final Environmental Impact Statement for the Proposed Keystone XL Project

    Science.gov (United States)

    2011-09-06

    ... border of the U.S. and Canada for the transport of crude oil across the U.S./Canada international... proposed Project that is designed to transport crude oil produced from oil sands in the Western Canadian... security; environmental, cultural, and economic impacts. Before making a decision on the proposed Project...

  8. 76 FR 2950 - Notice of Limitation on Claims Against Proposed Public Transportation Projects

    Science.gov (United States)

    2011-01-18

    ... Proposed Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice... judicial review of the FTA actions announced herein for the listed public transportation projects will be... final agency actions by issuing certain approvals for the public transportation projects listed below...

  9. 75 FR 13335 - Notice of Limitation on Claims Against Proposed Public Transportation Projects

    Science.gov (United States)

    2010-03-19

    ... Proposed Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice... judicial review of the FTA actions announced herein for the listed public transportation projects will be... FTA has taken final agency actions by issuing certain approvals for the public transportation projects...

  10. 77 FR 322 - Notice of Limitation on Claims Against Proposed Public Transportation Projects

    Science.gov (United States)

    2012-01-04

    ... Proposed Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice... judicial review of the FTA actions announced herein for the listed public transportation project will be... FTA has taken final agency actions by issuing certain approvals for the public transportation projects...

  11. 75 FR 71181 - Notice of Limitation on Claims Against Proposed Public Transportation Projects

    Science.gov (United States)

    2010-11-22

    ... Proposed Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice... judicial review of the FTA actions announced herein for the listed public transportation projects will be... issuing certain approvals for the public transportation projects listed below. The actions on these...

  12. 77 FR 14516 - Alabama Power Company, Martin Dam Hydroelectric Project; Notice of Proposed Revised Restricted...

    Science.gov (United States)

    2012-03-12

    ... Power Company, Martin Dam Hydroelectric Project; Notice of Proposed Revised Restricted Service List for... for inclusion in, the National Register of Historic Places at the Martin Dam Hydroelectric Project...)). The Commission's responsibilities pursuant to section 106 for the Martin Dam Hydroelectric Project...

  13. 75 FR 37780 - Proposed Waivers and Extensions of Project Periods: Presidential Academies and Congressional...

    Science.gov (United States)

    2010-06-30

    ... the teaching of history. We seek this waiver and extension of project period in order to enable each... or the teaching of history. The Secretary certifies that the proposed waiver and extension of project... American History and Civics Education, and 34 CFR 75.261(c)(2), as it applies to the project funded under...

  14. Competitive strategy for the proposed Texas high speed rail project : a system dynamics/ CLIOS process approach.

    Science.gov (United States)

    2017-09-10

    The Texas High-Speed Rail (HSR) is an unprecedented US project proposed by a private company. This project has many uncertainties because it will be funded only by the private sectors and it is the first US HSR project using foreign technology. The H...

  15. AN EXCEL-BASED DECISION SUPPORT SYSTEM FOR SCORING AND RANKING PROPOSED R&D PROJECTS

    OpenAIRE

    ANNE DE PIANTE HENRIKSEN; SUSAN W. PALOCSAY

    2008-01-01

    One of the most challenging aspects of technology management is the selection of research and development (R&D) projects from among a group of proposals. This paper introduces an interactive, user-friendly decision support system for evaluating and ranking R&D projects and demonstrates its application on an example R&D program. It employs the scoring methodology developed by Henriksen and Traynor to provide a practical technique that considers both project merit and project cost in the evalua...

  16. Proposed Project Selection Method for Human Support Research and Technology Development (HSR&TD)

    Science.gov (United States)

    Jones, Harry

    2005-01-01

    The purpose of HSR&TD is to deliver human support technologies to the Exploration Systems Mission Directorate (ESMD) that will be selected for future missions. This requires identifying promising candidate technologies and advancing them in technology readiness until they are acceptable. HSR&TD must select an may of technology development projects, guide them, and either terminate or continue them, so as to maximize the resulting number of usable advanced human support technologies. This paper proposes an effective project scoring methodology to support managing the HSR&TD project portfolio. Researchers strongly disagree as to what are the best technology project selection methods, or even if there are any proven ones. Technology development is risky and outstanding achievements are rare and unpredictable. There is no simple formula for success. Organizations that are satisfied with their project selection approach typically use a mix of financial, strategic, and scoring methods in an open, established, explicit, formal process. This approach helps to build consensus and develop management insight. It encourages better project proposals by clarifying the desired project attributes. We propose a project scoring technique based on a method previously used in a federal laboratory and supported by recent research. Projects are ranked by their perceived relevance, risk, and return - a new 3 R's. Relevance is the degree to which the project objective supports the HSR&TD goal of developing usable advanced human support technologies. Risk is the estimated probability that the project will achieve its specific objective. Return is the reduction in mission life cycle cost obtained if the project is successful. If the project objective technology performs a new function with no current cost, its return is the estimated cash value of performing the new function. The proposed project selection scoring method includes definitions of the criteria, a project evaluation

  17. 76 FR 46357 - Notice of Limitation on Claims Against Proposed Public Transportation Projects

    Science.gov (United States)

    2011-08-02

    ... DEPARTMENT OF TRANSPORTATION Federal Transit Administration Notice of Limitation on Claims Against Proposed Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice... that FTA has taken final agency actions by issuing certain approvals for the public transportation...

  18. 78 FR 26112 - Limitation on Claims Against Proposed Public Transportation Projects; Correction

    Science.gov (United States)

    2013-05-03

    ... DEPARTMENT OF TRANSPORTATION Federal Transit Administration Limitation on Claims Against Proposed Public Transportation Projects; Correction AGENCY: Federal Transit Administration (FTA), DOT. ACTION... Register on April 22, 2013, concerning a limitation on claims for certain specified public transportation...

  19. 77 FR 20355 - Proposed Information Collection; Comment Request; Award Amendment Requests and Project Service Maps

    Science.gov (United States)

    2012-04-04

    ... collection). Affected Public: Current recipients of EDA assistance, to include (1) cities or other political... DEPARTMENT OF COMMERCE Economic Development Administration Proposed Information Collection; Comment Request; Award Amendment Requests and Project Service Maps AGENCY: Economic Development...

  20. The Proposal of Scaling the Roles in Scrum of Scrums for Distributed Large Projects

    OpenAIRE

    Abeer M. AlMutairi; M. Rizwan Jameel Qureshi

    2015-01-01

    Scrum of scrums is an approach used to scale the traditional Scrum methodology to fit for the development of complex and large projects. However, scaling the roles of scrum members brought new challenges especially in distributed and large software projects. This paper describes in details the roles of each scrum member in scrum of scrum to propose a solution to use a dedicated product owner for a team and inclusion of sub-backlog. The main goal of the proposed solution i...

  1. 76 FR 4150 - Notice of Limitation on Claims Against Proposed Public Transportation Projects

    Science.gov (United States)

    2011-01-24

    ... DEPARTMENT OF TRANSPORTATION Federal Transit Administration Notice of Limitation on Claims Against Proposed Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice... public transportation project will be barred unless the claim is filed on or before July 25, 2011. FOR...

  2. 76 FR 55470 - Notice of Limitation on Claims Against Proposed Public Transportation Project

    Science.gov (United States)

    2011-09-07

    ... DEPARTMENT OF TRANSPORTATION Federal Transit Administration Notice of Limitation on Claims Against Proposed Public Transportation Project AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice... announced herein for the listed public transportation project will be barred unless the claim is filed on or...

  3. 78 FR 62361 - Green Mountain Power Corporation; Vermont; Otter Creek Hydroelectric Project; Notice of Proposed...

    Science.gov (United States)

    2013-10-21

    ... Power Corporation; Vermont; Otter Creek Hydroelectric Project; Notice of Proposed Restricted Service... issuance of a new license for the Otter Creek Hydroelectric Project No. 2558. The programmatic agreement... Agreement would be incorporated into any Order issuing a license. Green Mountain Power Corporation, as...

  4. 78 FR 6845 - Notice of Final Federal Agency Actions on Proposed Interchange Project in Massachusetts

    Science.gov (United States)

    2013-01-31

    ..., Cambridge, MA 02142, Monday through Friday 8:00 a.m.-4:30 p.m., 617-494-2419, [email protected]dot.gov . For the Massachusetts Department of Transportation Highway Division (MassDOT): Ms. Mary Hynes, Project Manager... on Proposed Interchange Project in Massachusetts AGENCY: Federal Highway Administration (FHWA), DOT...

  5. 78 FR 64143 - 30-Day Notice of Proposed Information Collection: Contractor's Requisition-Project Mortgages

    Science.gov (United States)

    2013-10-25

    ... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5683-N-88] 30-Day Notice of Proposed Information Collection: Contractor's Requisition--Project Mortgages AGENCY: Office of the Chief Information... Title of Information Collection: Contractor's Requisition--Project Mortgages. OMB Approval Number: 2502...

  6. Proposal to market Provo River Project power, Salt Lake City area

    International Nuclear Information System (INIS)

    1995-01-01

    This report is an environmental assessment of the Western Area Power Administrations's proposal to change the way in which the power produced by the Provo River Project (PRP) is marketed. The topics of the report include the alternatives to the proposed action that have been considered, a description of the environmental consequences of the proposed action and the alternatives that were considered, and other environmental considerations

  7. Proposed IMS infrastructure improvement project, Seward, Alaska. Final environmental impact statement

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-01

    This Environmental Impact Statement (EIS) examines a proposal for improvements at the existing University of Alaska, Fairbanks, Institute of Marine Science (IMS), Seward Marine Center. The Exxon Valdez Oil Spill (EVOS) Trustee Council is proposing to improve the existing research infrastructure to enhance the EVOS Trustee Council`s capabilities to study and rehabilitate marine mammals, marine birds, and the ecosystem injured by the Exxon Valdez oil spill. The analysis in this document focuses on the effects associated with construction and operation of the proposed project and its proposed alternatives. The EIS gives a detailed description of all major elements of the proposed project and its alternatives; identifies resources of major concern that were raised during the scoping process; describes the environmental background conditions of those resources; defines and analyzes the potential effects of the proposed project and its alternatives on these conditions; and identifies mitigating measures that are part of the project design as well as those proposed to minimize or reduce the adverse effects. Included in the EIS are written and oral comments received during the public comment period.

  8. Proposed IMS infrastructure improvement project, Seward, Alaska. Final environmental impact statement

    International Nuclear Information System (INIS)

    1994-09-01

    This Environmental Impact Statement (EIS) examines a proposal for improvements at the existing University of Alaska, Fairbanks, Institute of Marine Science (IMS), Seward Marine Center. The Exxon Valdez Oil Spill (EVOS) Trustee Council is proposing to improve the existing research infrastructure to enhance the EVOS Trustee Council's capabilities to study and rehabilitate marine mammals, marine birds, and the ecosystem injured by the Exxon Valdez oil spill. The analysis in this document focuses on the effects associated with construction and operation of the proposed project and its proposed alternatives. The EIS gives a detailed description of all major elements of the proposed project and its alternatives; identifies resources of major concern that were raised during the scoping process; describes the environmental background conditions of those resources; defines and analyzes the potential effects of the proposed project and its alternatives on these conditions; and identifies mitigating measures that are part of the project design as well as those proposed to minimize or reduce the adverse effects. Included in the EIS are written and oral comments received during the public comment period

  9. Swedish methane gas project: a proposal with three alternatives. Svenskt metangasprojekt: ett foerslag med tre alternativ

    Energy Technology Data Exchange (ETDEWEB)

    1977-01-01

    A proposal concerning a BIOGAS project is given. The proposal includes: (a) microbiological research on, e.g., needs for additives to optimize the process, influence of the content of dry substance, high rate digesters, one- or two-stage processing, temperature tolerance, pH regulation, pressure dependence, methods for process regulation, hygienics, foam-quenching; (b) construction of a test plant equipped with instruments for analysis and supervision; and (c) construction of prototype plants at a swine farm and at a slaughterhouse. Detailed budgets and schedules are given for the project at three different possible total costs.

  10. Technological Innovation Projects: Proposal For an Integrative Model Between Project Management and Knowledge Management in a Customer-Supplier Perspective

    Directory of Open Access Journals (Sweden)

    Edval da Silva Tavares

    2014-10-01

    Full Text Available In face of strong competition, companies in Brazil have increased their financial investments in automation, offering new products and services and reducing operating costs. These companies are focusing their efforts on core competencies and, therefore, they often lack the internal expertise to implement new projects, especially those that bring technological innovation. For this reason, we use the processes of outsourcing or subcontracting to help implement such projects. The unit of analysis in this study is the project and the object of the study to analyze the process of knowledge transfer from a provider to a customer during the duration of the project, which involves new technologies. The main motivation of this work is to address the acquisition and retention of new knowledge related to projects designed for business customers. We have developed a study of three cases of multiple financial firms that buy new technologies and two suppliers of information technology. As a practical result, a management model of knowledge transfer and retention of knowledge in client companies is proposed and incorporated into project management.

  11. 78 FR 16764 - Limitation on Claims Against Proposed Public Transportation Projects

    Science.gov (United States)

    2013-03-18

    ... DEPARTMENT OF TRANSPORTATION Federal Transit Administration Limitation on Claims Against Proposed Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice. SUMMARY... advising the public of final agency actions subject to Section 139(l) of Title 23, United States Code (U.S...

  12. 78 FR 4191 - Limitation on Claims Against Proposed Public Transportation Projects

    Science.gov (United States)

    2013-01-18

    ... DEPARTMENT OF TRANSPORTATION Federal Transit Administration Limitation on Claims Against Proposed Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice. SUMMARY... advising the public of final agency actions subject to Section 139(l) of Title 23, United States Code (U.S...

  13. 78 FR 33890 - Limitation on Claims Against Proposed Public Transportation Projects

    Science.gov (United States)

    2013-06-05

    ... DEPARTMENT OF TRANSPORTATION Federal Transit Administration Limitation on Claims Against Proposed Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice. SUMMARY... advising the public of final agency actions subject to Section 139(l) of Title 23, United States Code (U.S...

  14. 75 FR 36150 - Notice of Final Federal Agency Action on Proposed Transportation Project in Illinois

    Science.gov (United States)

    2010-06-24

    .... ACTION: Notice of limitation on claims for judicial review of actions by FHWA and other Federal agencies... result of a tiered environmental review process under the National Environmental Policy Act, 42 U.S.C... judicial review of the Tier 1 Federal agency actions of the proposed highway and transit project will be...

  15. 78 FR 45945 - 60-Day Notice of Proposed Information Collection: Contractor's Requisition-Project Mortgages

    Science.gov (United States)

    2013-07-30

    ... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5687-N-34] 60-Day Notice of Proposed Information Collection: Contractor's Requisition--Project Mortgages AGENCY: Office of the Assistant Secretary... Section A. A. Overview of Information Collection Title of Information Collection: Contractor's Requisition...

  16. STRATEGIC MAPS AND CRITICAL FACTORS FOR PROJECT MANAGEMENT MATURITY: A PROPOSAL

    Directory of Open Access Journals (Sweden)

    Sady Darcy Silva Junior

    2010-06-01

    Full Text Available Project Management (PM and Strategic Management (SM are two subjects of growing importance in the corporate environment which are normally considered in isolation. One way of integrating these two concepts might be via the concept of project management maturity (Westphal et al., 2008. Rabechini and Pessoa (2005 state that to obtain project management maturity, it is necessary to achieve success in a number of critical factors which include organizational culture and structure, as well as sponsorship at both tactical and strategic levels (Silva et al., 2008. Another way of achieving this connection is by using Balanced Scorecard (BSC as an auxiliary tool to integrate between projects and organizational strategy (Brock et al., 2003. The original developers of the BSC, Kaplan e Norton, subsequently developed the concept of strategy mapping, which they affirm "represents the missing link between the formulation and the execution of the strategy" (Kaplan e Norton, 2004. This paper proposes a strategy map identifying critical factors for attaining project management maturity. To formulate the map, we used a qualitative, exploratory approach oriented by Project Management theory and strategy mapping. We first identified 13 critical factors, then developed a strategy map, which was evaluated by six specialists (three in SM area and three in PM area.The results suggest links between strategic mapping nad critical factors in project management. It also contributes to both areas independently. Specifically, the study identifies critical factors for project management maturity while demonstrating the applicability of strategic mapping techniques to Balanced Scorecard concepts.

  17. 75 FR 32940 - Request for Proposals for New or Upgraded Transmission Line Projects Under Section 1222 of the...

    Science.gov (United States)

    2010-06-10

    ... financial condition and has the ability to secure the necessary financing to meet the Project's requirements... for Proposals for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy..., Department of Energy. ACTION: Request for Project Proposals. SUMMARY: The Department of Energy (DOE or...

  18. The Mediterranean Solar Plan: Project proposals for renewable energy in the Mediterranean Partner Countries region

    International Nuclear Information System (INIS)

    Jablonski, Sophie; Tarhini, Mohamad; Touati, Manaf; Gonzalez Garcia, David; Alario, Juan

    2012-01-01

    This paper presents a first assessment of the renewable energy projects, proposed by the nine Mediterranean Partner Countries (MPCs) under the Mediterranean Solar Plan (MSP) and the associated potential economic impacts. As one of the priority projects of the Union for the Mediterranean (UfM), the MSP's objective which attracted most attention until now is the intention to deploy an additional 20 GW of renewable electrical capacity in the Southern and Eastern Mediterranean region (covering the MPCs plus Turkey) by 2020. The main findings of this research are: (1) as of February 2010, a total of 10.3 GW of renewable project proposals were identified in the MPCs, corresponding to about half of the 20 GW target; (2) investment needs for the identified projects could amount to EUR 21 billion by 2020, which represents about five times the amount invested by the region in conventional electricity generation in the last decade; and (3) the difference between the cost of renewable electricity generation and the economic cost of its fossil fuel alternatives could amount to EUR 1.2 billion. Insights stemming from the results of this research can generate useful regional messages for energy policy leaders in the MPCs to accelerate the development of renewable energy projects. - Highlights: ► We conducted a systematic survey of renewable energy projects in the Mediterranean. ► The identified projects correspond to half the MSP 20 GW target. ► Maturity assessment is used to classify the advancement of the projects. ► We estimated the investment needs and required subsidies in the region by 2020.

  19. Tri-State Synfuels Project Review: Volume 12. Fluor project status. [Proposed Henderson, Kentucky coal to gasoline plant; engineering

    Energy Technology Data Exchange (ETDEWEB)

    1982-06-01

    The purpose of this report is to document and summarize activities associated with Fluor's efforts on the Tri-State Synfuels Project. The proposed facility was to be coal-to-transport fuels facility located in Henderson, Kentucky. Tri-State Synfuels Company was participating in the project as a partner of the US Department of Energy per terms of a Cooperative Agreement resulting from DOE's synfuel's program solicitation. Fluor's initial work plan called for preliminary engineering and procurement services to the point of commitment for construction for a Sasol Fischer-Tropsch plant. Work proceeded as planned until October 1981 when results of alternative coal-to-methanol studies revealed the economic disadvantage of the Synthol design for US markets. A number of alternative process studies followed to determine the best process configuration. In January 1982 Tri-State officially announced a change from Synthol to a Methanol to Gasoline (MTG) design basis. Further evaluation and cost estimates for the MTG facility eventually led to the conclusion that, given the depressed economic outlook for alternative fuels development, the project should be terminated. Official announcement of cancellation was made on April 13, 1982. At the time of project cancellation, Fluor had completed significant portions of the preliminary engineering effort. Included in this report are descriptions and summaries of Fluor's work during this project. In addition location of key project data and materials is identified and status reports for each operation are presented.

  20. Methodology Proposal for Increasing Swift Trust within Virtual Teams in the Inception Phase of a Project Life-Cycle: Project Manager’s Perspective

    Directory of Open Access Journals (Sweden)

    Milovanović Bojan Morić

    2015-12-01

    Full Text Available This paper proposes team building methodology for project managers in virtual teams as means to develop swift trust between new team members in the inception phase of the project life cycle. Proposed methodology encompasses activities within the first three days after the team formation and proposes the measuring tools for monitoring and managing trust development within the project team. Aim of this paper is to provide new insights to various decision makers potentially interested in increasing the performance of project teams operating in virtual environment, such as: investors, business owners and project managers working in virtual environment.

  1. CMS Proposal for the Engineering Data Management System (EDMS) Pilot Project with Matrix & Report

    CERN Document Server

    Kuipers, Jos

    1997-01-01

    The CMS Working Group for Engineering and Integration ( WOGEI) has been involved in the Engineering Data Management System ( EDMS) Task Force. This Task Force has started in 1995 with definition and selection procedure for an EDMS. The aim is to find out whether an EDMS is useful for CERN and the LHC experiments and which product is most suited. The CMS-WOGEI has proposed and carried out a pilot project with Matrix, the EDMS selected by the EDMS task force. In this technical note the pilot project is described and the experience gained with this is summarised.

  2. Native Hawaiian Ethnographic Study for the Hawaii Geothermal Project Proposed for Puna and Southeast Maui

    Energy Technology Data Exchange (ETDEWEB)

    Matsuoka, J.K; Minerbi, L. [Cultural Advocacy Network for Developing Options (CANDO) (United States); Kanahele, P.; Kelly, M.; Barney-Campbell, N.; Saulsbury [Oak Ridge National Lab., TN (United States); Trettin, L.D. [Tennessee Univ., Knoxville, TN (United States)

    1996-05-01

    This report makes available and archives the background scientific data and related information collected for an ethnographic study of selected areas on the islands of Hawaii and Maui. The task was undertaken during preparation of an environmental impact statement for Phases 3 and 4 of the Hawaii Geothermal Project (HGP) as defined by the state of Hawaii in its April 1989 proposal to Congress. Since the state of Hawaii is no longer pursuing or planning to pursue the HGP, DOE considers the project to be terminated. Information is included on the ethnohistory of Puna and southeast Maui; ethnographic fieldwork comparing Puna and southeast Maui; and Pele beliefs, customs, and practices.

  3. Proposing a project for building an e-commerce website for Ryijypalvelu-RP Oy

    OpenAIRE

    Sotkov, Ilya

    2014-01-01

    The thesis describes the development of a project proposal report for building an e-commerce website for a small textile firm based in Helsinki, Finland. The aim of the study is to determine how small businesses that are currently not highly involved in e-commerce should approach developing an e-commerce website in order to maximize the positive impact of selling on the Internet. The study combined the use of action research and qualitative research methodologies by developing a project p...

  4. 76 FR 2903 - Interconnection of the Proposed Hyde County Wind Energy Center Project (DOE/EIS-0461), and...

    Science.gov (United States)

    2011-01-18

    ... Wind Energy Center Project (DOE/EIS-0461), and Proposed Crowned Ridge Wind Energy Center Project (DOE... to prepare environmental impact statements (EISs) for the Hyde County Wind Energy Center Project and the Crowned Ridge Wind Energy Center Project in the Federal Register on November 30, 2010. Both...

  5. Uses of geothermal energy in Jordan for heating greenhouses; project proposal

    International Nuclear Information System (INIS)

    Al-Dabbas, Moh'd A. F.; Masarwah, Rober; Elkarmi, Fawwaz

    1993-08-01

    A proposal for the exploration of geothermal energy in Jordan for heating greenhouses. The report gives some background information on geothermal anomalies in Jordan, and outlines some on-going uses of geothermal energy in various parts of Jordan. The proposal is modelled on the 2664 square meter Filclair Super 9 Multispan greenhouse from France. The overall cost of the project involves three variables, the cost of the borehole, the cost of the greenhouse, and the cost of engineering services. The total cost ranges between three to four million dollars depending on the quantity and quality of information to be collected from the borehole. The advantages of geothermal heating compared with oil heating are emphasized. The project will enable geothermal heating and horticultural production to be monitored throughout the year, will produce data enabling rational and reliable water resources management, and will produce environmentally clean and efficient energy. (A.M.H.). 1 tab. 1 map

  6. Proposal and Evaluation of Management Method for College Mechatronics Education Applying the Project Management

    Science.gov (United States)

    Ando, Yoshinobu; Eguchi, Yuya; Mizukawa, Makoto

    In this research, we proposed and evaluated a management method of college mechatronics education. We applied the project management to college mechatronics education. We practiced our management method to the seminar “Microcomputer Seminar” for 3rd grade students who belong to Department of Electrical Engineering, Shibaura Institute of Technology. We succeeded in management of Microcomputer Seminar in 2006. We obtained the good evaluation for our management method by means of questionnaire.

  7. Proposed modifications to the Lower Mokelumne River Project, California: FERC Project No. 2916-004. Final environmental impact statement

    Energy Technology Data Exchange (ETDEWEB)

    1993-11-01

    This final environmental impact statement (FEIS) has been prepared for the Federal Energy Regulatory Commission (Commission) to consider modifications to the existing Lower Mokelumne River Project (LMRP) (FERC Project No. 2916-004) in California. Chinook salmon and steelhead trout populations in the lower Mokelumne River have experienced recent declines and fish kills associated, in part, with discharges from Camanche Dam. The California Department of Fish and Game and the California Sportfishing Protection Alliance have asked the Commission to investigate and correct these problems. A wide range of different mitigation actions has been proposed by parties participating in the scoping of this proceeding, and staff has evaluated these proposed actions in this assessment. The staff is recommending a combination of flow and non-flow modifications to the existing license, including new minimum flow and minimum pool elevation requirements at Camanche Reservoir, ramping rates on dam releases, interim attraction and out-migrant spike flows, instream habitat improvements, and a series of studies and monitoring to determine feasible means for solving off-site fish passage problems.

  8. Prioritization of proposed waste management construction projects for the Waste Management program within the Department of Energy

    International Nuclear Information System (INIS)

    Johnson, J.V.

    1995-01-01

    A prioritization process is used to evaluate and rank proposed construction projects within the Department of Energy's Waste Management program. The process is used to determine which projects should proceed with conceptual design activities. The proposed construction projects are evaluated against a set of criteria which reflect Waste Management priorities. A management review team ranks and scores the projects thereby generating a prioritized list of projects. Despite decreasing budgets and changing political climates, the process has been a successful decision-aiding tool for selecting construction projects to carry out the Waste Management mission within the Department of Energy

  9. A proposed selection process in Over-The-Top project portfolio management

    Directory of Open Access Journals (Sweden)

    Jemy Vestius Confido

    2018-05-01

    Full Text Available Purpose: The purpose of this paper is to propose an Over-The-Top (OTT initiative selection process for communication service providers (CSPs entering an OTT business. Design/methodology/approach: To achieve this objective, a literature review was conducted to comprehend the past and current practices of the project (or initiative selection process as mainly suggested in project portfolio management (PPM. This literature was compared with specific situations and the needs of CSPs when constructing an OTT portfolio. Based on the contrast between the conventional project selection process and specific OTT characteristics, a different selection process is developed and tested using group model-building (GMB, which involved an in-depth interview, a questionnaire and a focus group discussion (FGD. Findings: The paper recommends five distinct steps for CSPs to construct an OTT initiative portfolio: candidate list of OTT initiatives, interdependency diagram, evaluation of all interdependent OTT initiatives, evaluation of all non-interdependent OTT initiatives and optimal portfolio of OTT initiatives. Research limitations/implications: The research is empirical, and various OTT services are implemented; the conclusion is derived only from one CSP, which operates as a group. Generalization of this approach will require further empirical tests on different CSPs, OTT players or any firms performing portfolio selection with a degree of interdependency among the projects. Practical implications: Having considered interdependency, the proposed OTT initiative selection steps can be further implemented by portfolio managers for more effective OTT initiative portfolio construction. Originality/value: While the previous literature and common practices suggest ensuring the benefits (mainly financial of individual projects, this research accords higher priority to the success of the overall OTT initiative portfolio and recommends that an evaluation of the overall

  10. Proposal for the further development of the 'Ribeira Grande' agricultural geothermal project

    International Nuclear Information System (INIS)

    Popovski, Kiril; De Medeiros, Jorge Rosa; Rodrigues, Ana Catarina Tavares

    2000-01-01

    Geothermal project Ribeira Grande has been the first trial to introduce the possibilities of direct application of geothermal energy at Azores. As all the first experiences, it's development has been escorted with a list of difficulties and problems, resulting with non proper completion of some systems and installations. However, even not complete, the reached results justified both technically and economically the indigenous resource door for further activities and development. Presented proposal for the second phase of project development consists two very important advantages: 1) Enables development of new demonstration and productive projects, without engaging new import of fuels or other energents; 2) Enables development based on the already existing economy sectors at the islands and makes them more profitable and accommodated to the requests of the national and international market. However, influencing national and international preconditions for the realization of the proposed activities are not very convenient and are requesting a concentrate engagement of the Institute for Innovative Technologies of Azores INOVA during the period of next 5 years. The final success of this engagement shall open very wide possibilities for direct application of geothermal energy development in this isolated EC community, presently mainly orientated towards import both of energy and food. (Authors)

  11. Feasibility and potential effects of the proposed Amargosa Creek Recharge Project, Palmdale, California

    Science.gov (United States)

    Christensen, Allen H.; Siade, Adam J.; Martin, Peter; Langenheim, V.E.; Catchings, Rufus D.; Burgess, Matthew K.

    2015-09-17

    Historically, the city of Palmdale and vicinity have relied on groundwater as the primary source of water, owing, in large part, to the scarcity of surface water in the region. Despite recent importing of surface water, groundwater withdrawal for municipal, industrial, and agricultural use has resulted in groundwater-level declines near the city of Palmdale in excess of 200 feet since the early 1900s. To meet the growing water demand in the area, the city of Palmdale has proposed the Amargosa Creek Recharge Project (ACRP), which has a footprint of about 150 acres along the Amargosa Creek 2 miles west of Palmdale, California. The objective of this study was to evaluate the long-term feasibility of recharging the Antelope Valley aquifer system by using infiltration of imported surface water from the California State Water Project in percolation basins at the ACRP.

  12. 75 FR 70348 - Notice of Availability of the Draft Environmental Impact Statement for a Proposed Project in...

    Science.gov (United States)

    2010-11-17

    ... Environmental Impact Statement for a Proposed Project in Mariposa County, CA AGENCY: Federal Highway... Restoration Project in Mariposa County, California. DATES: Public circulation of this document will begin on... project on Wednesday, December 8, 2010 between 4 p.m. and 7 p.m. in Mariposa. The location is Mariposa...

  13. New Regional and Global HFC Projections and Effects of National Regulations and Montreal Protocol Amendment Proposals

    Science.gov (United States)

    Velders, G. J. M.

    2015-12-01

    Hydrofluorocarbons (HFCs) are used as substitutes for ozone-depleting substances that are being phased out globally under Montreal Protocol regulations. New global scenarios of HFC emissions reach 4.0-5.3 GtCO2-eq yr-1 in 2050, which corresponds to a projected growth from 2015 to 2050 which is 9% to 29% of that for CO2 over the same time period. New baseline scenarios are formulated for 10 HFC compounds, 11 geographic regions, and 13 use categories. These projections are the first to comprehensively assess production and consumption of individual HFCs in multiple use sectors and geographic regions with emission estimates constrained by atmospheric observations. In 2050, in percent of global HFC emissions, China (~30%), India and the rest of Asia (~25%), Middle East and northern Africa (~10%), and USA (~10%) are the principal source regions; and refrigeration and stationary air conditioning are the major use sectors. National regulations to limit HFC use have been adopted recently in the European Union, Japan and USA, and four proposals have been submitted in 2015 to amend the Montreal Protocol to substantially reduce growth in HFC use. Calculated baseline emissions are reduced by 90% in 2050 by implementing the North America Montreal Protocol amendment proposal. Global adoption of technologies required to meet national regulations would be sufficient to reduce 2050 baseline HFC consumption by more than 50% of that achieved with the North America proposal for most developed and developing countries. The new HFC scenarios and effects of national regulations and Montreal Protocol amendment proposals will be presented.

  14. Evaluation of dredged material proposed for ocean disposal from Westchester Creek project area, New York

    Energy Technology Data Exchange (ETDEWEB)

    Pinza, M.R.; Gardiner, W.W.; Barrows, E.S.; Borde, A.B.

    1996-11-01

    The objective of the Westchester Creek project was to evaluate proposed dredged material from this area to determine its suitability for unconfined ocean disposal at the Mud Dump Site. Westchester Creek was one of five waterways that the US Army Corps of Engineers- New York District (USACE-NYD) requested the Battelle/Marine Sciences Laboratory (MSL) to sample and evaluate for dredging and disposal in May 1995. The evaluation of proposed dredged material from the Westchester Creek project area consisted of bulk sediment chemical analyses, chemical analyses of dredging site water and elutriate, benthic acute and water-column toxicity tests, and bioaccumulation studies. Thirteen individual sediment core samples were collected from this area and analyzed for grain size, moisture content, and total organic carbon (TOC). One composite sediment sample representing the Westchester Creek area to be dredged, was analyzed for bulk density, specific gravity, metals, chlorinated pesticides, polychlorinated biphenyl (PCB) congeners, polynuclear aromatic hydrocarbons (PAHs), and 1,4-dichlorobenzene. Dredging site water and elutriate water, which is prepared from the suspended- particulate phase (SPP) of the Westchester Creek sediment composite, was analyzed for metals, pesticides, and PCBS.

  15. MODEL REQUEST FOR PROPOSALS TO PROVIDE ENERGY AND OTHER ATTRIBUTES FROM AN OFFSHORE WIND POWER PROJECT

    Energy Technology Data Exchange (ETDEWEB)

    Jeremy Firestone; Dawn Kurtz Crompton

    2011-10-22

    This document provides a model RFP for new generation. The 'base' RFP is for a single-source offshore wind RFP. Required modifications are noted should a state or utility seek multi-source bids (e.g., all renewables or all sources). The model is premised on proposals meeting threshold requirements (e.g., a MW range of generating capacity and a range in terms of years), RFP issuer preferences (e.g., likelihood of commercial operation by a date certain, price certainty, and reduction in congestion), and evaluation criteria, along with a series of plans (e.g., site, environmental effects, construction, community outreach, interconnection, etc.). The Model RFP places the most weight on project risk (45%), followed by project economics (35%), and environmental and social considerations (20%). However, if a multi-source RFP is put forward, the sponsor would need to either add per-MWh technology-specific, life-cycle climate (CO2), environmental and health impact costs to bid prices under the 'Project Economics' category or it should increase the weight given to the 'Environmental and Social Considerations' category.

  16. Pipeline politics—A study of India′s proposed cross border gas projects

    International Nuclear Information System (INIS)

    Nathan, Hippu Salk Kristle; Kulkarni, Sanket Sudhir; Ahuja, Dilip R.

    2013-01-01

    India′s energy situation is characterized by increasing energy demand, high fossil fuel dependency, large import shares, and significant portion of population deprived of modern energy services. At this juncture, natural gas, being the cleanest fossil fuel with high efficiency and cost effectiveness, is expected to play an important role. India, with only 0.6% of proven world reserves, is not endowed with adequate natural gas domestically. Nevertheless, there are gas reserves in neighbouring regions which gives rise to the prospects of three cross border gas pipeline projects, namely, Iran–Pakistan–India, Turkmenistan–Afghanistan–Pakistan–India, and Myanmar–Bangladesh–India. This study is a political analysis of these pipeline projects. First, it provides justification on use of natural gas and promotion of cross border energy trade. Then it examines these three pipeline projects and analyses the security concerns, role of different actors, their positions, shifting goals, and strategies. The study develops scenarios on the basis of changing circumstances and discusses some of the pertinent issues like technology options for underground/underwater pipelines and role of private players. It also explores impact of India′s broader foreign relations and role of SAARC on the future of pipelines and proposes energy induced mutually assured protection (MAP) as a concept for regional security. -- Highlights: •We justify the need for cross border energy trade through gas pipelines for India. •We examine prospective pipeline projects—IPI, TAPI, MBI and their security issues. •We develop scenarios and analyze role of actors, their positions, and strategies. •We discuss technology and policy options for realizing these gas pipelines. •We propose energy induced mutually assured protection (MAP) for regional security

  17. Position sensitivity of the proposed segmented germanium detectors for the DESPEC project

    International Nuclear Information System (INIS)

    Khaplanov, A.; Tashenov, S.; Cederwall, B.

    2009-01-01

    The DESPEC HPGe array is a part of the NuSTAR project at FAIR, Germany. It is aimed at the spectroscopy of the stopped decaying exotic nuclei. Segmented γ-ray tracking detectors are proposed for this array in order to maximize detection efficiency and background suppression when searching for very rare events. Two types of detector modules-stacks of three 16-fold segmented planar crystals and 12- and 16-fold segmented clover detectors-have been investigated and compared from the point of view of the achievable position resolution using pulse shape analysis (PSA). To this end, detector signals from realistic γ-ray interactions have been calculated. These signals were treated by PSA in order to reconstruct the photon interaction locations. Comparing the initial interaction locations to the reconstructed ones, it was found that the double-sided strip planar detector yielded position reconstruction errors at least a factor 2 lower than the other detectors considered.

  18. Proposed Tenaska Washington II Generation Project : Final Environmental Impact Statement. Volume 2: Public Involvement.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1994-01-01

    In regard to the proposed Tenaska Washington II Generation Project, the goal of the Bonneville Power Administration`s (BPA) Environmental Impact Statement (EIS) public involvement process is to determine the issues to be examined and pertinent analyses to be conducted and to solicit comments on the content and quality of information presented in the Draft Environmental Impact Statement (DEIS). Comments and questions are solicited from the public and government agencies during the scoping process and during the comment period and public hearing on the DEIS, to find out what is of most concern to them. The end product of the public involvement process is the Comment Report which follows in part of this volume on Public Involvement.

  19. Proposal of experimental facilities for studies of nuclear data and radiation engineering in the Intense Proton Accelerator Project

    CERN Document Server

    Baba, M; Nagai, Y; Ishibashi, K

    2003-01-01

    A proposal is given on the facilities and experiments in the Intense Proton Accelerator Project (J-PARC) relevant to the nuclear data and radiation engineering, nuclear astrophysics, nuclear transmutation, accelerator technology and space technology and so on. (3 refs).

  20. Proceedings of the public meeting to address a proposed federal radiation research agenda. Volume 2. Science projection papers

    International Nuclear Information System (INIS)

    1980-03-01

    Separate abstracts were prepared for the 14 science projection papers presented at a public meeting on March 10-11, 1980 to address a proposed federal radiation research agenda into the biological effects of ionizing radiation

  1. Protecting Place Through Community Alliances: Haida Gwaii Responds to the Proposed Enbridge Northern Gateway Project

    Science.gov (United States)

    Crist, Valine

    This research contributes to the emerging dialogue concerning power relationships and the alliances that are challenging current frameworks in an attempt to create positive change. Worldwide, local people in rural places are threatened by development paradigms and conflicting social, political, economic, and ecological values. Large-scale development, such as the Enbridge Northern Gateway Project (NGP), provide a tangible example of our failing systems and make the interplay of these elements palpable. Increasingly, communities are coalescing to challenge the current models and economically motivated agendas threatening Indigenous sovereignty and local lifeways. Central to these coalitions are Indigenous peoples who are aligning with non-Indigenous neighbours to renegotiate power relationships. This research examines these dynamic alliances and uses Haida Gwaii's resistance to the NGP as an example of the formidable strength of community coalitions mobilized by intersecting values. To contextualize the NGP within the broader discourse, I problematize Canada's environmental assessment process and consider how media portrays the growing resistance to the proposed project. Drawing on information presented through the environmental assessment, I analyze the main messages and shared values of Haida Gwaii citizens opposed to the NGP. This thesis focuses on this unanimous and galvanizing resistance, which is largely motivated by the reliance on local food sources and an embodied connection to Haida Gwaii shared by Island citizens. The continued denial of Aboriginal title and rights was inherent throughout this consideration and is an underlying theme throughout the analyses.

  2. Far-infrared elastic scattering proposal for the Avogadro Project's silicon spheres

    Science.gov (United States)

    Humayun, Muhammad Hamza; Khan, Imran; Azeem, Farhan; Chaudhry, Muhammad Rehan; Gökay, Ulaş Sabahattin; Murib, Mohammed Sharif; Serpengüzel, Ali

    2018-05-01

    Avogadro constant determines the number of particles in one mole of a substance, thus relating the molar mass of the substance to the mass of this substance. Avogadro constant is related to Système Internationale base units by defining the very concept of chemical quantity. Revisions of the base units created a need to redefine the Avogadro constant, where a collaborative work called the Avogadro Project is established to employ optical interferometry to measure the diameter of high quality 100 mm silicon spheres. We propose far-infrared spectroscopy for determining the Avogadro constant by using elastic scattering from the 100 mm Avogadro Project silicon spheres. Similar spectroscopic methods are already in use in the near-infrared, relating whispering gallery modes of the 1 mm silicon spheres to the diameter of the spheres. We present numerical simulations in the far-infrared and the near-infrared, as well as spatially scaled down elastic scattering measurements in the near-infrared. These numerical and experimental results show that, the diameter measurements of 100 mm single crystal silicon spheres with elastic scattering in the far-infrared can be considered as an alternative to optical interferometry.

  3. Effects of the proposed EPA groundwater standards on the Uranium Mill Tailings Remedial Action Project

    International Nuclear Information System (INIS)

    Titus, F.B.

    1988-01-01

    Potential groundwater contamination beneath the 24 tailings piles that are to be stabilized under the UMTRA Project was intended in early project plans to be minimized by placing disposal piles over thick stratigraphic sequences of tight (minimally permeable) formations, and by designing covers that contained low permeability soil/clay infiltration barriers. The court-ordered revision of the UMTRA groundwater standards by EPA (proposed standards of September 1987) include very low Maximum Concentration Limits (MCLs), which are based mostly on Primary Drinking Water Standards. EPA also mandates that the designs should control radioactivity and hazardous constituents...for up to one thousand years, to the extends reasonably achievable, and, in any case, for at least two hundred years.... In order to accommodate this stipulation, transport modeling of water and contaminants in both the vadose and saturated zones beneath the piles is run until steady state conditions are reached. The early decision to locate stabilized piles over tight formations now exacerbates the problem of complying with the standards, since the contaminants percolate to groundwater that moves only slowly through strata having low permeabilities. Innovative solutions have been evaluated that are aimed at further minimizing long-term infiltration, geochemically fixing contaminants in place before they reach groundwater, or otherwise minimizing contaminant flux

  4. More dams planned for Nitassinan Rivers : Innu Nation backgrounder on the proposed Churchill River hydro projects

    International Nuclear Information System (INIS)

    1999-01-01

    The Labrador Innu have expressed their concerns regarding the proposed development of a huge hydroelectric project for the Nitassinan Rivers. The Innu people were not consulted regarding the negotiations which will take place between Newfoundland and Quebec. The biggest concern of the Innu people is the cumulative environmental and social effects of the proposed development and how it will contribute to opening up their territory to further development. For example, access roads, transmission corridors and large-scale clear-cut forestry operations would all impact on their traditional way of life. This paper also described the impacts that the Innu have already experienced as a result of hydroelectric development on the Nitassinan Rivers during the 1970s, when the government of Newfoundland gave the rights to develop and exploit water resources, forests and minerals to a private company. At that time, large areas of hunting and trapping territories were flooded, belongings were lost and burial sites were flooded. The flooding also resulted in increased levels of methyl mercury in fish in the reservoirs as well as downstream. The losses suffered by the Innu people have yet to be addressed by the governments

  5. Baseline environmental survey of proposed uranium mining projects of Domiasiat, Meghalaya

    International Nuclear Information System (INIS)

    Khathing, D.T.; Myrboh, B.; Nongkynrih, P.; War, S.A.; Marbaniang, D.G.; Iongwai, P.S.

    2005-01-01

    West Khasi Hills District of Meghalaya is identified as having a large and rich deposits of Uranium. However, actual extraction on a commercial scale that may lead to an increase in the socio-economic development of the state in particular and the country in general, is yet to be undertaken. This is due to lack of any baseline environmental survey giving rise to speculative information and causing a fear psychosis in the minds of the locals populace about the negative effects of Uranium mining. A preoperational survey and environmental monitoring of the proposed mining sites and its adjacent areas would establish the baseline status of the natural radioactivity and some chemical constituents in different environmental matrices via. air, water, soil, biota and aquatic ecosystems. The North Eastern Hill University, Shillong, Meghalaya has undertaken the Project funded by DST and BRNS, Department of Atomic Energy, Govt. of India which aims to provide baseline environmental data on ambient air, water and soil quality in and around the proposed Uranium mining site of Domiasiat, West Khasi Hills in the state of Meghalaya. Trace elements (elements like Mg, Zn, Ca, K, Na, Se, As, Fe, Cu, Co, Cr, Ni, Pb, Cd, Mn etc) and the status of the activity in the samples are determined. (author)

  6. 75 FR 27854 - 30-Day Notice of Proposed Information Collection: DS-4048, Projected Sales of Major Weapons in...

    Science.gov (United States)

    2010-05-18

    ... Information Collection: DS-4048, Projected Sales of Major Weapons in Support of Section 25(a)(1) of the Arms... Reduction Act of 1995. Title of Information Collection: Projected Sales of Major Weapons in Support of... automated collection techniques or other forms of technology. Abstract of proposed collection: Section 25(a...

  7. 75 FR 1408 - Pick-Sloan Missouri Basin Program, Eastern and Western Division Proposed Project Use Power Rate

    Science.gov (United States)

    2010-01-11

    ... of Proposed Pick-Sloan Missouri Basin Program, Eastern and Western Divisions, Project Use Power Rate...) for Project Use Power for the Pick-Sloan Missouri Basin Program (P-SMBP), Eastern and Western... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Pick-Sloan Missouri Basin Program, Eastern and...

  8. Surveys of forest bird populations found in the vicinity of proposed geothermal project subzones in the district of Puna, Hawaii

    International Nuclear Information System (INIS)

    Jacobi, J.D.; Reynolds, M.; Ritchotte, G.; Nielsen, B.; Viggiano, A.; Dwyer, J.

    1994-10-01

    This report presents data on the distribution and status of forest bird species found within the vicinity of proposed geothermal resource development on the Island of Hawaii. Potential impacts of the proposed development on the native bird populations found in the project are are addressed

  9. Surveys of forest bird populations found in the vicinity of proposed geothermal project subzones in the district of Puna, Hawaii

    Energy Technology Data Exchange (ETDEWEB)

    Jacobi, J.D.; Reynolds, M.; Ritchotte, G.; Nielsen, B.; Viggiano, A.; Dwyer, J.

    1994-10-01

    This report presents data on the distribution and status of forest bird species found within the vicinity of proposed geothermal resource development on the Island of Hawaii. Potential impacts of the proposed development on the native bird populations found in the project are are addressed.

  10. 78 FR 53001 - Limitation on Claims Against Proposed Public Transportation Projects

    Science.gov (United States)

    2013-08-27

    ... Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice. SUMMARY... announced herein for the listed public transportation project will be barred unless the claim is filed on or... issuing certain approvals for the public transportation projects listed below. The actions on the projects...

  11. 77 FR 76597 - Limitation on Claims against Proposed Public Transportation Projects

    Science.gov (United States)

    2012-12-28

    ... Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice. SUMMARY... actions announced herein for the listed public transportation project will be barred unless the claim is... issuing certain approvals for the public transportation project listed below. The actions on this project...

  12. 77 FR 71475 - Limitation on Claims Against Proposed Public Transportation Projects

    Science.gov (United States)

    2012-11-30

    ... Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice. SUMMARY... public transportation project will be barred unless the claim is filed on or before April 29, 2013. FOR... the public transportation projects listed below. The actions on the projects, as well as the laws...

  13. 77 FR 43144 - Limitation on Claims Against Proposed Public Transportation Projects

    Science.gov (United States)

    2012-07-23

    ... Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice. SUMMARY... public transportation project will be barred unless the claim is filed on or before January 21, 2013. FOR... the public transportation projects listed below. The actions on these projects, as well as the laws...

  14. 78 FR 23817 - Limitation on Claims Against Proposed Public Transportation Projects

    Science.gov (United States)

    2013-04-22

    ... Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice. SUMMARY... announced herein for the listed public transportation project will be barred unless the claim is filed on or... issuing certain approvals for the public transportation projects listed below. The actions on the projects...

  15. HAD 2020 Project: A proposal to consolidate hospital-based home care in Spain

    Directory of Open Access Journals (Sweden)

    Oriol Estrada Cuxart

    2017-04-01

    Full Text Available Hospital at home (HAH appeared in Spain 36 years ago with the opening of several units. The initial push was truncated by the lack of political leadership and sometimes clinical as well. The current reality offers an irregular implementation with a wide disparity of assistance and resource models. The Sociedad Española de Hospitalización a Domicilio (SEHAD has not played either the expected scientific or professional leadership roles. The “Plan HAD2020: key of the future” was designed as revulsive. This is an ambitious 4-year project to consolidate HAH as a care modality. Its deployment consists of five phases. Preparation: the foundations of the strategic plan (EP were established. Situation analysis: a national survey was carried out on the 106 operational units (data 2014. Validation of the EP: contributions and proposals of action of the members of SEHAD. National Congress 2016: presentation and approval of EP conclusions and proposals. EP deployment phase: it will be extended until 2020 and will be executed by various teams of referents spread over five lines of work. The final objective set for the year 2020 is: to come up with a more homogenous care model; to promote the training and professional recognition of those who work in the HAD; that each hospital in Spain has a HAH unit; recognition and empowerment by the national health system. HAD2020 has marked an inflection point in the SEHAD. The traced path and the effort of all the HAH professionals will allow reaching the vision which the pioneers of the HAH in Spain pursued.

  16. An Aerial Radiological Survey of the Yucca Mountain Project Proposed Land Withdrawal and Adjacent Areas

    International Nuclear Information System (INIS)

    Craig Lyons, Thane Hendricks

    2006-01-01

    An aerial radiological survey of the Yucca Mountain Project (YMP) proposed land withdrawal was conducted from January to April 2006, and encompassed a total area of approximately 284 square miles (73,556 hectares). The aerial radiological survey was conducted to provide a sound technical basis and rigorous statistical approach for determining the potential presence of radiological contaminants in the Yucca Mountain proposed Land withdrawal area. The survey site included land areas currently managed by the Bureau of Land Management, the U.S. Air Force as part of the Nevada Test and Training Range or the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO) as part of the Nevada Test Site (NTS). The survey was flown at an approximate ground speed of 70 knots (36 meters per second), at a nominal altitude of 150 ft (46 m) above ground level, along a set of parallel flight lines spaced 250 ft (76 m) apart. The flight lines were oriented in a north-south trajectory. The survey was conducted by the DOE NNSA/NSO Remote Sensing Laboratory-Nellis, which is located in Las Vegas, Nevada. The aerial survey was conducted at the request of the DOE Office of Civilian Radioactive Waste Management. The primary contaminant of concern was identified by YMP personnel as cesium-137 ( 137 Cs). Due to the proposed land withdrawal area's proximity to the historical Nuclear Rocket Development Station (NRDS) facilities located on the NTS, the aerial survey system required sufficient sensitivity to discriminate between dispersed but elevated 137 Cs levels from those normally encountered from worldwide fallout. As part of that process, the survey also measured and mapped the exposure-rate levels that currently existed within the survey area. The inferred aerial exposure rates of the natural terrestrial background radiation varied from less than 3 to 22 microroentgens per hour. This range of exposure rates was primarily due to the surface

  17. A proposal to improve ecological compensation practice in road and railway projects in Spain

    Energy Technology Data Exchange (ETDEWEB)

    Villarroya, Ana, E-mail: avillarroya@alumni.unav.es; Puig, Jordi, E-mail: jpbaguer@unav.es

    2013-09-15

    To reduce ecological impacts caused by development projects, avoidance, minimization and compensation techniques have to be taken together into consideration along Environmental Impact Assessment (EIA) procedures. This paper explores the particular role that ecological compensation has had in recent road and railway EIA procedures in Spain, as seen through the review of a set of recent EIA Records of Decision (RODs) that confirms precedent findings. Noticing that residual impacts are not paid much attention, and that there is no evidence of a solid public participation in ecological impact evaluation, it proposes to increase the awareness on residual impacts, as a way to make easier public access to the allegedly most sensitive moment of EIA implementation: (residual) impact evaluation. -- Highlights: ► Ecological compensation practice in Spain is much lower than avoidance or mitigation. ► Residual impacts are overlooked in EIA processes and public participation is low. ► An increased awareness of residual impacts may also promote public participation. ► Current context needs these small steps to move towards better compensation practice.

  18. HTGR reactor physics, thermal-hydraulics and depletion uncertainty analysis: a proposed IAEA coordinated research project

    International Nuclear Information System (INIS)

    Tyobeka, Bismark; Reitsma, Frederik; Ivanov, Kostadin

    2011-01-01

    The continued development of High Temperature Gas Cooled Reactors (HTGRs) requires verification of HTGR design and safety features with reliable high fidelity physics models and robust, efficient, and accurate codes. The predictive capability of coupled neutronics/thermal hydraulics and depletion simulations for reactor design and safety analysis can be assessed with sensitivity analysis and uncertainty analysis methods. In order to benefit from recent advances in modeling and simulation and the availability of new covariance data (nuclear data uncertainties) extensive sensitivity and uncertainty studies are needed for quantification of the impact of different sources of uncertainties on the design and safety parameters of HTGRs. Uncertainty and sensitivity studies are an essential component of any significant effort in data and simulation improvement. In February 2009, the Technical Working Group on Gas-Cooled Reactors recommended that the proposed IAEA Coordinated Research Project (CRP) on the HTGR Uncertainty Analysis in Modeling be implemented. In the paper the current status and plan are presented. The CRP will also benefit from interactions with the currently ongoing OECD/NEA Light Water Reactor (LWR) UAM benchmark activity by taking into consideration the peculiarities of HTGR designs and simulation requirements. (author)

  19. 76 FR 45551 - Post-2014 Resource Pool; Loveland Area Projects, Proposed Power Allocation

    Science.gov (United States)

    2011-07-29

    ... Proposed Power Allocation. SUMMARY: Western Area Power Administration (Western), a Federal power marketing... Pool Proposed Power Allocation developed under the requirements of the Power Marketing Initiative of... resulted in this Notice of Proposed Power Allocation. DATES: The comment period on this Notice of Proposed...

  20. 77 FR 64586 - Limitation on Claims Against Proposed Public Transportation Projects

    Science.gov (United States)

    2012-10-22

    ... Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice. SUMMARY... actions announced herein for the listed public transportation project will be barred unless the claim is... actions by issuing certain approvals for the public transportation projects listed below. The actions on...

  1. 78 FR 65756 - Limitation on Claims Against Proposed Public Transportation Projects

    Science.gov (United States)

    2013-11-01

    ... Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice. SUMMARY... review of the FTA actions announced herein for the listed public transportation project will be barred... taken final agency actions by issuing certain approvals for the public transportation project listed...

  2. 78 FR 45287 - Limitation on Claims against Proposed Public Transportation Projects

    Science.gov (United States)

    2013-07-26

    ... Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice. SUMMARY... FTA action announced herein for the listed public transportation project will be barred unless the... final agency action by issuing a certain approval for the public transportation project listed below...

  3. Return on Scientific Investment - RoSI: a PMO dynamical index proposal for scientific projects performance evaluation and management.

    Science.gov (United States)

    Caous, Cristofer André; Machado, Birajara; Hors, Cora; Zeh, Andrea Kaufmann; Dias, Cleber Gustavo; Amaro Junior, Edson

    2012-01-01

    To propose a measure (index) of expected risks to evaluate and follow up the performance analysis of research projects involving financial and adequate structure parameters for its development. A ranking of acceptable results regarding research projects with complex variables was used as an index to gauge a project performance. In order to implement this method the ulcer index as the basic model to accommodate the following variables was applied: costs, high impact publication, fund raising, and patent registry. The proposed structured analysis, named here as RoSI (Return on Scientific Investment) comprises a pipeline of analysis to characterize the risk based on a modeling tool that comprises multiple variables interacting in semi-quantitatively environments. This method was tested with data from three different projects in our Institution (projects A, B and C). Different curves reflected the ulcer indexes identifying the project that may have a minor risk (project C) related to development and expected results according to initial or full investment. The results showed that this model contributes significantly to the analysis of risk and planning as well as to the definition of necessary investments that consider contingency actions with benefits to the different stakeholders: the investor or donor, the project manager and the researchers.

  4. Guidelines for the environmental impact statement for the proposed Great Whale River Hydroelectric Project. Backgorund information

    International Nuclear Information System (INIS)

    1992-09-01

    The guidelines presented on the preparation of the environmental impact statement for the Great Whale hydroelectric project by Hydro-Quebec stipulated a project justification, description of the biophysical and social environments, a project description, and that the assessment must address project impacts, mitigative and compensatory measures, environmental surveillance, monitoring, and long-term management programs. Background information presented in this document provides technical notes on the guidelines and the environmental assessment process, a glossary of terms, and biographical notes. The technical notes address guideline structure, project justification, native knowledge, evaluation issues, cumulative impacts, and the assessment and review process

  5. Guidelines for the environmental impact statement for the proposed Great Whale River Hydroelectric Project

    International Nuclear Information System (INIS)

    1992-01-01

    The guidelines presented on the preparation of the environmental impact statement for the Great Whale hydroelectric project by Hydro-Quebec stipulated a project justification, description of the biophysical and social environments, a project description, and that the assessment must address project impacts, mitigative and compensatory measures, environmental surveillance, monitoring, and long-term management programs. Background information presented in this document provides technical notes on the guidelines and the environmental assessment process, a glossary of terms, and biographical notes. The technical notes address guideline structure, project justification, native knowledge, evaluation issues, cumulative impacts, and the assessment and review process

  6. Study and Proposal of the Nuclear Power Plant Technology for the Ninh Thuan 2 Project

    International Nuclear Information System (INIS)

    Tran Chi Thanh; Le Van Hong; Hoang Sy Than; Nguyen Van De; Mai Dinh Trung; Nguyen Nhi Dien; Nguyen Minh Tuan; Pham Van Lam; Phan Ngoc Tuyen; Do Chi Dung; Hoang Minh Giang; Le Dai Dien

    2015-01-01

    The Ninh Thuan 1&2 Nuclear Power Plant Projects were approved on November 25th, 2009. At present, the task of NPP technology selection of these projects is an important and complex task. This report will show the acceptable method to create a set of criterion for selecting technology for Ninh Thuan 2 NPP project. The result of evaluation of three NPP technologies, such as ATMEA1, AP1000 and MPWR+ introduced in the Feasibility Study Reports of this project, will be discussed. In conclusion, the AP1000 technology is the first candidate for the Ninh Thuan 2 NPP Project. (author)

  7. Proposed approach for developing process-based KPIs for project control during the pre-project stage

    NARCIS (Netherlands)

    Haponava, T.; Al-Jibouri, Saad H.S.; Mawdesley, M.; Ahmed, Syed M.; Azhar, Salman; Mohamed, Sherif

    2007-01-01

    In recent years a great deal of attention has been made to measuring different aspects of construction project performance. Some of the tools used for this purpose are the Key Performance Indicators (KPIs). The main shortcoming of these however is that most of them are end product oriented and hence

  8. Environmental problem analysis of the proposed Sage Creek Coal Project in the Flathead Valley of British Columbia

    Energy Technology Data Exchange (ETDEWEB)

    1981-01-01

    The proposed Sage Creek Coal Project is analysed with respect to environmental impacts, international concerns and public concerns. Although information available to date is insufficient to pursue an analysis enabling a determination of the full social and environmental cost of the project, basic concerns and issues have been elucidated. Emphasis is given to the potential adverse effects on existing fish species and on wildlife species, particularly grizzly bear, moose and mountain goat. Because the area affected by the project includes both Canadian and U.S. territory, environmental objectives of the U.S. government for the Upper Flathead Valley ecosystem must also be considered in any future B.C. government decisions. Public opposition to the project from an environmental standpoint is documented. The report concludes the preferred option for a Ministry of Environment position is to recommend the project not proceed.

  9. White Paper on Data Repository Reorganization Proposal for the xLPR Project

    Energy Technology Data Exchange (ETDEWEB)

    Klasky, Hilda B [ORNL; Williams, Paul T [ORNL; Bass, Bennett Richard [ORNL

    2012-09-01

    As the xLPR project moves along, it is important to properly manage the knowledge generated by the different groups. We focus specifically on the knowledge and communications written in files, including general documents, source code and executable files. Data generated through the project are different in nature and, for this reason, need to be treated differently. To that end, ORNL put in place a series of tools that facilitate proper storage and management of project data, document and code changes, group collaboration, knowledge transfer, transparency, accountability and auditability. This paper describes the approaches/tools that we recommend for moving the project forward on knowledge management.

  10. Environmental impact statement for the proposed Great Whale River Hydroelectric Project

    International Nuclear Information System (INIS)

    1992-01-01

    Guidelines are presented on the preparation of the environmental impact statement for the Great Whale hydroelectric project by Hydro-Quebec. The statement must include a project justification, description of the biophysical and social environments, a project description, and must address project impacts, mitigative and compensatory measures, environmental surveillance, monitoring, and long-term management programs. Appendices include a memorandum of understanding, list of members of the review bodies, list of briefs submitted at the public scoping hearings, and a list of public comments on the draft guidelines. 17 figs

  11. The Challenge of Integrating OHS into Industrial Project Risk Management: Proposal of a Methodological Approach to Guide Future Research (Case of Mining Projects in Quebec, Canada

    Directory of Open Access Journals (Sweden)

    Adel Badri

    2015-06-01

    Full Text Available Although risk management tools are put to good use in many industrial sectors, some large projects have been met with numerous problems due to failure to take occupational health and safety (OHS into consideration. In spite of the high level of risk and uncertainty associated with many industrial projects, the number of studies of methods for managing all known risks systematically remains small. Under effervescent economic conditions, industries must meet several challenges associated with frequent project start-ups. In highly complex and uncertain environments, rigorous management of risk remains indispensable for avoiding threats to the success of projects. Many businesses seek continually to create and improve integrated approaches to risk management. This article puts into perspective the complexity of the challenge of integrating OHS into industrial project risk management. A conceptual and methodological approach is proposed to guide future research focused on meeting this challenge. The approach is based on applying multi-disciplinary research modes to a complex industrial context in order to identify all scenarios likely to contain threats to humans or the environment. A case study is used to illustrate the potential of the proposed approach for application and its contribution to meeting the challenge of taking OHS into consideration. On-site researchers were able to develop a new approach that helped two mining companies in Quebec (Canada to achieve successful integration of OHS into expansion projects.

  12. Assessment of wind turbine wake-effects in the proposed "Markerwaard" wind/hydro project

    NARCIS (Netherlands)

    Vermeulen, P.E.J.; Builtjes, P.J.H.; Vijge, J.B.A.; Smet, L. de

    1980-01-01

    Figure I gives on overview of the location of the "Markerwaard" area within the "IJsselmeer" lake in the middle of the Netherlands. This area is the last part of the large reclamation project in the "IJsselmeer" lake. This project has resulted thus far in the realisation of four polders of roughly

  13. 75 FR 79008 - Proposed Collection; Comment Request; Study of Substance Abuse doc.com Module Project

    Science.gov (United States)

    2010-12-17

    ... referral to treatment for patients who abuse substances. The overall goal of this project is to assess the... provide significant services directly to the public to survey customers to determine the kind and quality of services they want and their level of satisfaction with existing services. The project will...

  14. Management of information in development projects – a proposed integrated model

    Directory of Open Access Journals (Sweden)

    C. Bester

    2008-11-01

    Full Text Available The first section of the article focuses on the need for development in Africa and the specific challenges of development operations. It describes the need for a holistic and integrated information management model as part of the project management body of knowledge aimed at managing the information flow between communities and development project teams. It is argued that information, and access to information, is crucial in development projects and can therefore be seen as a critical success factor in any development project. In the second section of the article, the three information areas of the holistic and integrated information management model are described. In the section thereafter we suggest roles and actions for information managers to facilitate information processes integral to the model. These processes seek to create a developing information community that aligns itself with the development project, and supports and sustains it.

  15. 78 FR 13643 - Intent To Prepare a Draft Environmental Impact Statement for the Proposed Delta Wetlands Project...

    Science.gov (United States)

    2013-02-28

    ... DEPARTMENT OF DEFENSE Department of the Army, Corps of Engineers Intent To Prepare a Draft Environmental Impact Statement for the Proposed Delta Wetlands Project in San Joaquin and Contra Costa Counties... Joaquin County and Holland Tract and Webb Tract are located in Contra Costa County. A wetland delineation...

  16. 77 FR 31037 - Notice of Segregation of Public Lands for the Proposed Hyder Valley Solar Energy Project in...

    Science.gov (United States)

    2012-05-24

    ...; AZA34425] Notice of Segregation of Public Lands for the Proposed Hyder Valley Solar Energy Project in... of up to 2 years. This is for the purpose of processing one solar energy right-of-way (ROW) application submitted by Pacific Solar Investments, LLC, to construct and operate the Hyder Valley Solar...

  17. 43 CFR 404.51 - Are proposed projects under the Rural Water Supply Program reviewed by the Administration?

    Science.gov (United States)

    2010-10-01

    ... Water Supply Program reviewed by the Administration? 404.51 Section 404.51 Public Lands: Interior... SUPPLY PROGRAM Feasibility Studies § 404.51 Are proposed projects under the Rural Water Supply Program... the Reclamation's Rural Water Supply Program. This includes review under Executive Order 12322 to...

  18. Return on Scientific Investment – RoSI: a PMO dynamical index proposal for scientific projects performance evaluation and management

    Directory of Open Access Journals (Sweden)

    Cristofer André Caous

    2012-06-01

    Full Text Available Objective: To propose a measure (index of expected risks to evaluateand follow up the performance analysis of research projects involvingfinancial and adequate structure parameters for its development.Methods: A ranking of acceptable results regarding researchprojects with complex variables was used as an index to gauge aproject performance. In order to implement this method the ulcerindex as the basic model to accommodate the following variableswas applied: costs, high impact publication, fund raising, and patentregistry. The proposed structured analysis, named here as RoSI(Return on Scientific Investment comprises a pipeline of analysis tocharacterize the risk based on a modeling tool that comprises multiplevariables interacting in semi-quantitatively environments. Results:This method was tested with data from three different projects in ourInstitution (projects A, B and C. Different curves reflected the ulcer indexes identifying the project that may have a minor risk (project C related to development and expected results according to initial or full investment. Conclusion: The results showed that this model contributes significantly to the analysis of risk and planning as well as to the definition of necessary investments that consider contingency actions with benefits to the different stakeholders: the investor or donor, the project manager and the researchers.

  19. Proposal to amend a partner project agreement with ISTC for the CMS collaboration

    CERN Document Server

    2000-01-01

    This document concerns an amendment to a partner project agreement with the ISTC, namely the Partner Project Agreement 1718p for "Technology Reliability Demonstration and Precise CMS Electromagnetic Calorimetry Performance at LHC on a Base of Specified Tungstate (PbWO4) Scintillation Crystals". This Partner Project was approved by Council on 17 December 1999 (cf. CERN/2312). For reasons set out in this document the Finance Committee is invited to authorise CERN to negotiate an amendment to the Partner Project Agreement 1718p. The purpose of the amendment is to increase the production rate of crystals through the acquisition, installation and commissioning of 33 additional crystal growth ovens for a total amount of 1 500 000 US dollars.

  20. Proposal for the extension of a partner project agreement with ISTC ? ATLAS collaboration

    CERN Document Server

    2000-01-01

    This document concerns the extension of the scope of work covered by a partner project agreement with the ISTC, namely Partner Project Agreement 1800p for Manufacturing, Assembly and Testing of the End-cap Transition Radiation Tracker (TRT) for the ATLAS Experiment at the CERN LHC. This Partner Project Agreement was approved by Council on 23 June 2000 (c.f. draft minutes of the meeting CERN/2340/Draft). For reasons set out in this document the Finance Committee is invited to approve the extension of the scope of work covered by Partner Project Agreement 1800p to include the Manufacturing, Assembly and Testing of type C End-cap support rings for a total amount of 503 720 Swiss francs.

  1. Case study: Proposed application of project management techniques for construction of nuclear power plant in Malaysia

    International Nuclear Information System (INIS)

    Syahirah Abdul Rahman; Phongsakorn Prak Tom; Wan Abd Hadi Wan Abu Bakar; Shaharum Ramli

    2010-01-01

    This study discusses the techniques of project management for the construction of nuclear power plants that can be used in Malaysia. Nuclear power reactors are expected to apply is the categories of Gen III + reactor where it is safer and more modern than the first generation of reactors built in the 1970s. The objective of this study is that the construction of this reactor to be completed by the stipulated time and not exceed the cost estimates. In addition, project management is also able to meet all the specifications and achieve the quality standard. In this study, the techniques used in project management to ensure the success of construction projects of nuclear power plants are a Gantt Chart, CPM/ PERT and Microsoft Project. From the study, found that these techniques can assist in facilitating the management of the project for the construction of nuclear power plants to ensure that the estimated time and cost can be managed more effectively as well as quality of care. (author)

  2. Proposing a Conceptual Framework to Utilize Storytelling Mechanism into Project Management Life Cycle

    Directory of Open Access Journals (Sweden)

    mahdi shami zanjani

    2013-10-01

    Full Text Available It is rather difficult to exploit knowledge in project organizations due to their unique characteristics and temporal behavior of activities. Therefore, development of knowledge management capability among projects is accounted for an important source to gain competitive advantage. This paper tries to provide a conceptual framework in order to introduce applications of storytelling as an effective and inexpensive mechanism for projects knowledge management. At first, a conceptual framework was designed including 58 story applications in activities of project life cycle by studying and analyzing the related literature. Then, validation of this conceptual framework was investigated and verified by relevant experts. Finally, application of storytelling was assessed within the projects of Sanam industrial and commercial company, using the framework designed. Analysis of data demonstrates that out of 58 applications introduced, this company benefit from just 28 applications. Research method in this section was survey. According to the available information, this paper is one of the first researches which have adopted to introduce applications of storytelling in the life cycle of project management by providing a conceptual framework.

  3. Preliminary methodological proposal for estimating environmental flows in projects approved by the ministry of environment and sustainable development (MADS), Colombia

    International Nuclear Information System (INIS)

    Pinilla Agudelo, Gabriel A; Rodriguez Sandoval, Erasmo A; Camacho Botero, Luis A

    2014-01-01

    A methodological proposal for estimating environmental flows in large projects approved by Agencia Nacional de Licencias Ambientales (ANLA) in Colombian rivers was developed. The project is the result of an agreement between the MADS and the Universidad Nacional de Colombia, Bogota (UNC). The proposed method begins with an evaluation of hydrological criteria, continues with a hydraulic and water quality validation, and follows with the determination of habitat integrity. This is an iterative process that compares conditions before and after the project construction and allows to obtain the magnitude of a monthly flow that, besides preserving the ecological functions of the river, guarantees the water uses downstream. Regarding to the biotic component, the proposal includes the establishment and monitoring of biotic integrity indices for four aquatic communities (periphyton, macro invertebrates, riparian vegetation, and fish). The effects that flow reduction may produce in the medium and long term can be assessed by these indices. We present the results of applying the methodology to several projects licensed by the MADS.

  4. 75 FR 44053 - Proposed Collection; Comment Request: CDFI/CDE Project Profiles Web Form

    Science.gov (United States)

    2010-07-27

    ... provide loans, investments, financial services and technical assistance to underserved populations and... DEPARTMENT OF THE TREASURY Community Development Financial Institutions Fund Proposed Collection.... 3506(c)(2)(A). Currently, the Community Development Financial Institutions (CDFI) Fund, Department of...

  5. User Participation in Coproduction of Health Innovation: Proposal for a Synergy Project.

    Science.gov (United States)

    Nygren, Jens; Zukauskaite, Elena; Westberg, Niklas

    2018-05-09

    This project concerns advancing knowledge, methods, and logic for user participation in coproduction of health innovations. Such advancement is vital for several reasons. From a user perspective, participation in coproduction provides an opportunity to gain real influence over goal definition, design, and implementation of health innovations, ensuring that the solution developed solves real problems in right ways. From a societal perspective, it's a mean to improve the efficiency of health care and the implementation of the Patient Act. As for industry, frameworks and knowledge of coproduction offer tools to operate in a complex sector, with great potential for innovation of services and products. The fundamental objective of this project is to advance knowledge and methods of how user participation in the coproduction of health innovations can be applied in order to benefit users, industry, and public sector. This project is a synergy project, which means that the objective will be accomplished through collaboration and meta-analysis between three subprojects that address different user groups, apply different strategies to promote human health, and relate to different parts of the health sector. Furthermore, subprojects focus on distinctive stages in the spectrum of innovation, with the objective to generate knowledge of the innovation process as a whole. The project is organized around three work packages related to three challenges-coproduction, positioning, and realization. Each subproject is designed such that it has its own field of study with clearly identified objectives but also targets work packages to contribute to the project as a whole. The work on the work packages will use case methodology for data collection and analysis based on the subprojects as data sources. More concretely, logic of multiple case studies will be applied with each subproject representing a separate case which is similar to each other in its attention to user participation in

  6. Proposed Tenaska Washington II Generation Project : Final Environmental Impact Statement. Volume 1: Environmental Analysis and Technical Appendices.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1994-01-01

    BPA is considering whether to purchase electrical power from a proposed privately-owned combustion-turbine electrical generation plant in Washington. The plant would be fired by natural gas and would use combined-cycle technology to generate 240 average megawatts (aMW) of energy. The plant would be developed, owned, and operated by Tenaska Washington Partners II, L.P. The project would be located about 19 kilometers (12 miles) southeast of downtown Tacoma in the Frederickson Industrial Area, Pierce County. The proposed plant would occupy about half of a 6.4-hectare (16-acre) parcel and would be consistent with the industrial character of its surroundings. The proposed site is currently undeveloped and zoned for industrial use by the county. Main environmental concerns identified in the scoping process and in comments on the Draft Environmental Impact Statement (EIS) include: (1) potential air quality impacts, such as emissions and their contribution to the {open_quotes}greenhouse{close_quotes} effect; (2) potential health and safety impacts, such as nuisance odors, plant safety, visibility and heat-emission systems which may affect low-flying planes and potential health effects of electric and magnetic fields; and (3) potential water quality and quantity impacts, such as the amount of wastewater to be discharged, the source and amount of water required for plant operation. These and other issues are discussed in detail in the EIS. The proposed project already includes many features designed to reduce environmental impacts. Based on investigations performed for the EIS, no significant unavoidable adverse environmental impacts associated with the proposed project were identified, and no evidence emerged to suggest that the proposed action is controversial. The EIS is being mailed to numerous agencies, groups, and individuals (see Section 8.0). There will be a 30-day no-action period before any decisions are made and the Record of Decision is signed.

  7. 77 FR 51106 - Limitation on Claims Against Proposed Public Transportation Projects

    Science.gov (United States)

    2012-08-23

    ... Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice. SUMMARY... claim seeking judicial review of the FTA actions announced herein for the listed public transportation... given that FTA has taken final agency actions by issuing certain approvals for the public transportation...

  8. 77 FR 34122 - Limitation on Claims Against Proposed Public Transportation Projects

    Science.gov (United States)

    2012-06-08

    ... Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice. SUMMARY... claim seeking judicial review of the FTA actions announced herein for the listed public transportation... given that FTA has taken final agency actions by issuing certain approvals for the public transportation...

  9. 77 FR 14464 - Notice of Final Federal Agency Actions on Proposed Highway Project in Wisconsin

    Science.gov (United States)

    2012-03-09

    ... existing roadway and bridges and reconfigure the study-area freeway system to address safety issues and design deficiencies and provide additional capacity. The project termini are 124th Street on the west... Water Conservation Act as amended [16 U.S.C. 4601], Farmland Protection Policy Act of 1980 [7 U.S.C...

  10. Systematic Approach to Formulate PSS Development Project Proposals in the Fuzzy Front End

    DEFF Research Database (Denmark)

    Barquet, Ana Paula B.; Pigosso, Daniela Cristina Antelmi; Rozenfeld, Henrique

    2013-01-01

    be considered by companies during this definition. The systematization of PSS attributes may help increase the knowledge about different PSS projects that can emerge in the front end, thus leading to the discovery of opportunities that are not apparent in the existing business models and give rise to new ideas...

  11. 78 FR 26319 - Deepwater Horizon Oil Spill; Proposal of Future Early Restoration Projects and Environmental Reviews

    Science.gov (United States)

    2013-05-06

    ... selected and implemented in accordance with the Oil Pollution Act of 1990 (OPA), the Framework Agreement... oil spill under the Oil Pollution Act 1990 (OPA; 33 U.S.C. 2701 et seq.). Pursuant to OPA, federal and... cost of this project is approximately $3.5 million. Sea Rim State Park Amenities (Jefferson County...

  12. Integrating fuel treatment into ecosystem management: A proposed project planning process

    Science.gov (United States)

    Keith D. Stockmann; Kevin D. Hyde; J. Greg Jones; Dan R. Loeffler; Robin P. Silverstein

    2010-01-01

    Concern over increased wildland fire threats on public lands throughout the western United States makes fuel reduction activities the primary driver of many management projects. This single-issue focus recalls a management planning process practiced frequently in recent decades - a least-harm approach where the primary objective is first addressed and then plans are...

  13. 78 FR 46858 - Proposed Waiver and Extension of the Project Period for the Individuals With Disabilities...

    Science.gov (United States)

    2013-08-02

    ... affiliates need continued support to engage in meaningful dialogue, continual learning, and problem solving... dissemination strategies. The Partnership Project has developed and enhanced tools and strategies to improve the... disabilities within general education reform efforts. Engagement tools and strategies include: (1) Various...

  14. Research Proposal: Methodology for Assessment Frameworks in Large-scale Infrastructural Water Projects

    NARCIS (Netherlands)

    Hommes, Saskia

    2005-01-01

    Water management is a central and ongoing issue in the Netherlands. Large infrastructural projects are being carried out and planned in a number of water systems. These initiatives operate within a complex web of interactions, between short- and long-term, economic costs and benefits, technical

  15. Procedure for matching synfuel users with potential suppliers. Appendix B. Proposed and ongoing synthetic fuel production projects

    Energy Technology Data Exchange (ETDEWEB)

    None

    1981-08-07

    To assist the Department of Energy, Office of Fuels Conversion (OFC), in implementing the synthetic fuel exemption under the Powerplant and Industrial Fuel Use Act (FUA) of 1978, Resource Consulting Group, Inc. (RCG), has developed a procedure for matching prospective users and producers of synthetic fuel. The matching procedure, which involves a hierarchical screening process, is designed to assist OFC in: locating a supplier for a firm that wishes to obtain a synthetic fuel exemption; determining whether the fuel supplier proposed by a petitioner is technically and economically capable of meeting the petitioner's needs; and assisting the Synthetic Fuels Corporation or a synthetic fuel supplier in evaluating potential markets for synthetic fuel production. A data base is provided in this appendix on proposed and ongoing synthetic fuel production projects to be used in applying the screening procedure. The data base encompasses a total of 212 projects in the seven production technologies.

  16. High Temperature Reactors for a proposed IAEA Coordinated Research Project on Energy Neutral Mineral Development Processes

    International Nuclear Information System (INIS)

    Haneklaus, Nils; Reitsma, Frederik; Tulsidas, Harikrishnan

    2014-01-01

    The International Atomic Energy Agency (IAEA) is promoting a new Coordinated Research Project (CRP) to elaborate on the applicability and potential of using High Temperature Reactors (HTRs) to provide process heat and/or electricity to power energy intensive mineral development processes. The CRP aims to provide a platform for cooperation between HTR-developers and mineral development processing experts. Energy intensive mineral development processes with (e.g. phosphate-, gold-, copper-, rare earth ores) or without (e.g. titanium-, aluminum ore) the possibility to recover accompanying uranium and/or thorium that could be developed and used to run the HTR for “energy neutral” processing of the primary ore shall be discussed according to the participants needs. This paper specifically focuses on the aspects that need to be addressed by HTR-designers and developers. First requirements that should be fulfilled by the HTR-designs are highlighted together with the desired outcomes of the research project. (author)

  17. The Educational Project as a pivotal framework for pedagogical practice: reflections and proposals for action

    Directory of Open Access Journals (Sweden)

    Javier ARGOS GONZÁLEZ

    2011-09-01

    Full Text Available The basic features of an educational task are sufficiently complex to demand their «construction» from theoretical-pedagogical frameworks that are consistent, rigorous and ethically founded. To achieve this end, the coherence and meaning of such a task become transformed into indispensable elements which need to be projected, both into the school and into the classroom, which, in the last resort, is where the important pedagogical formulae that have been adopted on consensus are given shape. Taking these considerations into account, we analyse in the present research the importance of the educational School Project, as a text which upholds the pedagogical task, before going on to formulate a series of postulates which should be upheld in our professional practice. Thus elements such as the pedagogy of listening, unhurried learning, and intuition, creativity, curiosity and pleasure in learning emerge and are visible in the pedagogical scene.

  18. Projeto larga escala: uma proposta pedagógica atual Larga escala project: an actual pedagogic proposal

    Directory of Open Access Journals (Sweden)

    Anna Luiza de F. P. Lins Gryschek

    2000-06-01

    Full Text Available Discorre-se sobre um projeto de formação dos atendentes de enfermagem, o conhecido "Projeto Larga Escala", seu histórico, a legislação que o ampara e a sua trajetória na Secretaria Municipal da Saúde do Município de São Paulo. Conclui-se que o "Projeto Larga Escala" é uma proposta pedagógica válida, devendo ser incentivada e ampliada em âmbito nacional.This study discourses about a nursing project, the well known "Larga Escala Project", its history, the legislation that gives support to it and its trajectory in the Health Secretary of the Township of São Paulo. The conclusion is that the "Larga Escala Project" is a valid pedagogic proposal and it must be encouraged and amplified to all the national field.

  19. 76 FR 14099 - Proposed Collection of Information for an Evaluation of the Young Parents Demonstration Project...

    Science.gov (United States)

    2011-03-15

    ... desired format, reporting burden (time and financial resources) is minimized, collection instruments are... DEPARTMENT OF LABOR Employment and Training Administration Proposed Collection of Information for.../or continuing collections of information in accordance with the Paperwork Reduction Act of 1995 (PRA...

  20. 75 FR 76479 - Notice of Proposed Information Collection for Public Comment: County Data Record Project

    Science.gov (United States)

    2010-12-08

    ... forms of information technology; e.g., permitting electronic submission of responses. Title of Proposal... Associates Inc. and its subcontractors, Fairview Industries and Smart Data Strategies, is conducting a... activities. First, this database will give HUD an ability to track home sales, foreclosures and tax...

  1. 76 FR 43657 - Proposed Information Collection; Comment Request; Project 25 Compliance Assessment Program...

    Science.gov (United States)

    2011-07-21

    ... DEPARTMENT OF COMMERCE National Institute of Standards and Technology Proposed Information... via the Internet at [email protected] ). SUPPLEMENTARY INFORMATION: I. Abstract The September 11... collection techniques or other forms of information technology. Comments submitted in response to this notice...

  2. Proposal for the Extension of a Project Agreement with ISTC - Crystal Clear Collaboration

    CERN Document Server

    2002-01-01

    This document concerns the extension of the scope of work covered by a project agreement with the ISTC, entitled "Development of the Detector Production Technology for a New Generation of Positron Emission Tomographs to be used in Medicine and Pharmacology" which was approved by Finance Committee on 19 September 2001 (CERN/FC/4478). For the reasons set out in this document, the Finance Committee is invited to approve the extension of the scope of work covered by the above project agreement for the optimisation of the technology for a total amount of 160 000 US dollars. This extension will be partially funded by two external sponsors (RAYTEST - DE and the UNIVERSITY OF LAUSANNE - CH) at the level of 90 000 US dollars. CERN's contribution, which will be funded by revenue generated by its technology transfer activities, will not exceed 70 000 US dollars. This extension will bring the total amount of the Project Agreement to 935 000 US dollars, of which CERN's total contribution will not exceed 320 000 US dollars...

  3. Proposed methodology for completion of scenario analysis for the Basalt Waste Isolation Project

    International Nuclear Information System (INIS)

    Roberds, W.J.; Plum, R.J.; Visca, P.J.

    1984-11-01

    This report presents the methodology to complete an assessment of postclosure performance, considering all credible scenarios, including the nominal case, for a proposed repository for high-level nuclear waste at the Hanford Site, Washington State. The methodology consists of defensible techniques for identifying and screening scenarios, and for then assessing the risks associated with each. The results of the scenario analysis are used to comprehensively determine system performance and/or risk for evaluation of compliance with postclosure performance criteria (10 CFR 60 and 40 CFR 191). In addition to describing the proposed methodology, this report reviews available methodologies for scenario analysis, discusses pertinent performance assessment and uncertainty concepts, advises how to implement the methodology (including the organizational requirements and a description of tasks) and recommends how to use the methodology in guiding future site characterization, analysis, and engineered subsystem design work. 36 refs., 24 figs., 1 tab

  4. GENIUS-TF - a test facility for the GENIUS project. Proposal

    International Nuclear Information System (INIS)

    Klapdor-Kleingrothaus, H.V.; Dietz, A.; Heusser, G.

    2001-02-01

    GENIUS is a proposal for a large scale detector of rare events. As a first step of the experiment, a small test version, the Genius Test-Facility is proposed to be built up at the Laboratori Nazionali del Gran Sasso (LNGS). With about 40 kg of natural Ge detectors operated in liquid nitrogen, Genius-TF could exclude (or directly confirm) the DAMA annual modulation signature within about two years of measurement using both, signal and signature of the claimed WIMP Dark matter. The funding of the experiment has already been approved and four 2.5 kg germanium detectors with an extreme low treshold of 500 eV have been produced. The installation can be started immediately. No additional space in the Underground Laboratory is required. (orig.)

  5. Florar Project: a forest proposal to PETROBRAS-TRANSPETRO; Projeto Florar: uma proposta florestal para a PETROBRAS-TRANSPETRO

    Energy Technology Data Exchange (ETDEWEB)

    Alves, Anibal Jose Constantino; Melo Neto, Joao Evangelista de; Martini, Andrea Dietrich; Ozorio, Tarcisio Faria; Lima, Silvia Ferreira de [PETROBRAS Transporte S. A. (TRANSPETRO), Rio de Janeiro, RJ (Brazil)

    2008-07-01

    This work presents for discussion a proposal of a forest project idealized to be implemented, in form of a linear forest, in the long of TRANSPETRO pipeway, from north to south of the country. The initial goals, restricted to the State of Sao Paulo, presume the forest fomentation of 1,000 kilometers of path, covering an area of approximately 10,000 hectares, where can be possible to realize native and exotic species plantation, considering the legal restrictions. The proposal presumes also a fund to the special nature reserve creation in the cities crossed by TRANSPETRO pipeways. The pilot proposed in this work could take place at 'Plano Diretor de Dutos de Sao Paulo', which involves 27 cities, incorporating the environmental recuperation programs from native vegetation suppression and intervention in permanent preservation area in terms of forest law. (author)

  6. Summary record of the experts meeting on the proposed OECD-IRSN STLOC project

    International Nuclear Information System (INIS)

    2004-01-01

    The purpose of this meeting was to determine the interest in member countries for the types of LOCA tests envisaged in the STLOC programme proposed by IRSN. The IRSN proposal was circulated among this Group in advance of the meeting. After the presentations and discussions, the Group recommendations were as follows: different views were expressed as to the need to perform the LOCA integral tests; there was an understanding that the results of separate effect tests (ANL, JAERI, Halden) would need to be obtained before deciding on the intended LOCA tests proposed in STLOC; IRSN and the OECD-NEA should explore the possibility to run the first ST test with air ingress (STLOC1), for which partial funding already exists (this test is foreseen for 2008); the need of LOCA tests as envisaged in STLOC should be re-assessed in about three years time (2006); analytical and experimental progress on LOCA tests should be monitored until then, through for instance the SEGFSM. An executive summary of the IRSN Source term LOCA program LOCA part is given in an appendix

  7. Environmental Assessment. Proposed Air Force Space Division Housing Project, White Point, Los Angeles, California

    Science.gov (United States)

    1984-07-01

    render any potential impactsnegligible. 5 E. Diking, Dredging and Shoreline Structures The project would have no effect on these areas of concern; see3...San Juan Capistrano Indians of Southern California [1812-1826]") and Hugo Reid’s letters I printed in the Los Angeles Star in the 1800’s ( Heizer 1968...California5 n.d. A Brief History of Fort MacArthur. Heizer , R. F. (ed.) 1968 The Indians of Los Angeles County: Hugo Reid’s Letters of 1852

  8. Proposal of a risk-factor-based analytical approach for integrating occupational health and safety into project risk evaluation.

    Science.gov (United States)

    Badri, Adel; Nadeau, Sylvie; Gbodossou, André

    2012-09-01

    Excluding occupational health and safety (OHS) from project management is no longer acceptable. Numerous industrial accidents have exposed the ineffectiveness of conventional risk evaluation methods as well as negligence of risk factors having major impact on the health and safety of workers and nearby residents. Lack of reliable and complete evaluations from the beginning of a project generates bad decisions that could end up threatening the very existence of an organization. This article supports a systematic approach to the evaluation of OHS risks and proposes a new procedure based on the number of risk factors identified and their relative significance. A new concept called risk factor concentration along with weighting of risk factor categories as contributors to undesirable events are used in the analytical hierarchy process multi-criteria comparison model with Expert Choice(©) software. A case study is used to illustrate the various steps of the risk evaluation approach and the quick and simple integration of OHS at an early stage of a project. The approach allows continual reassessment of criteria over the course of the project or when new data are acquired. It was thus possible to differentiate the OHS risks from the risk of drop in quality in the case of the factory expansion project. Copyright © 2011 Elsevier Ltd. All rights reserved.

  9. Are REDD+ community forest projects following the principles for collective action, as proposed by Ostrom?

    Directory of Open Access Journals (Sweden)

    Abdul-Razak Saeed

    2017-03-01

    Full Text Available Forested countries in the global south that have agreed to engage in REDD+, a policy mechanism for addressing climate change, are receiving support to improve laws, policies, systems and structures. As a mechanism initiated at the global level and seeking to use forests to address a global commons crisis (atmospheric carbon concentration, understanding how REDD+ translates into implementation at the local level is essential. Therefore, using a systematic review approach, we examined 15 studies of REDD+ in the context of public and/or community managed forests, drawn from a comprehensive application of inclusion criteria to identify relevant published peer-reviewed empirical research. The common property resources literature was used to highlight the role of local institutions in REDD+ and to distil how REDD+ community forest projects conform to Ostrom’s collective action principles. The review revealed limited sharing of information and decision-making authority with communities; a general absence of FPIC; and a lack of defined benefit sharing and conflict resolution arrangements in many of the REDD+ projects.

  10. Economic Functions Proposal of Urgency Prioritization of Investment Projects of Operated Railway Bridges

    Directory of Open Access Journals (Sweden)

    Pitoňák Martin

    2014-12-01

    Full Text Available The main objective of the article is to describe the proposals of economic functions within the prioritization of urgency investments of operated railway bridges within a comprehensive evaluation of existing bridges. The purpose of the paper is a comprehensive assessment of existing bridges and to define determinants and determinants of decision-making and designing a mechanism of decision-making procedures of prioritized infrastructure measures in the form of repairs and reconstructions of bridges resulting from the records of supervising activities based not only on technical but also economic aspects to the railway infrastructure manager.

  11. Assessment of heavy metal concentration in water around the proposed Mkuju river uranium project in Tanzania

    International Nuclear Information System (INIS)

    Banzi, F.P.; Msaki, P.K.; Mohammed, N.K.

    2015-01-01

    Effective verification for compliance with water quality standards in uranium mining in Tanzania requires data sensitive to monitor heavy metal concentration in water around the Mkuju River Uranium Project before mining commences. The area susceptible for pollution by the project was estimated using AERMOD dispersion model and found to cover about 1300 km"2. Thirty one surface and groundwater samples were collected and analysed for heavy metals and physicochemical properties using ICP-MS and standards techniques, respectively. The physicochemical properties for water samples analysed ranges from 5.7 to 7.8 for pH, 2.8 to 80.2 mg/L for TDS and 15 to 534.5 mS/cm for EC. These values show that the water in the vicinity of the Mkuju River Uranium Project is normal. The ranges of concentration of heavy metals (µgL"-"1) determined in water ranges were: Al(2 to 9049), Cr(0.2 to 19.96), Mn (0.1 to 1452), Fe(2 to 53890), Co(0.02 to 27.63), Ni(0.2 to 9.7), Cu(2 to 17), Zn(2 to 62.94), As(0.4 to 19.17), Cd(0.02 to 0.14), Pb (0.02 to 78.68), Th (0.002 to 1.73), U(0.002 to 29.76). These values are below the tolerance levels of concentrations set by different International organisations. Therefore heavy metal toxicity in the study area is marginal. The parameters that could serve as baseline data because of their enhanced sensitivity to pollution were (i) concentration of chromium, cobalt, nickel, copper, zinc, arsenic, cadmium and lead in water (ii) pH, TDS and EC for water, (iii) TDS ratio for surface to ground water values and (iv) correlation coefficients between the heavy metals. However, since TDS values are season dependent, this indicator can serve as baseline data when measured during the dry season as was the case in the study. (author)

  12. Project Overview: Cumulus Humilis Aerosol Processing Study (CHAPS): Proposed Summer 2007 ASP Field Campaign

    Energy Technology Data Exchange (ETDEWEB)

    Berkowitz, Carl M.; Berg, Larry K.; Ogren, J. A.; Hostetler, Chris A.; Ferrare, Richard

    2006-05-18

    This white paper presents the scientific motivation and preliminary logistical plans for a proposed ASP field campaign to be carried out in the summer of 2007. The primary objective of this campaign is to use the DOE Gulfstream-1 aircraft to make measurements characterizing the chemical, physical and optical properties of aerosols below, within and above large fields of fair weather cumulus and to use the NASA Langley Research Center’s High Spectral Resolution Lidar (HSRL) to make independent measurements of aerosol backscatter and extinction profiles in the vicinity of these fields. Separate from the science questions to be addressed by these observations will be information to add in the development of a parameterized cumulus scheme capable of including multiple cloud fields within a regional or global scale model. We will also be able to compare and contrast the cloud and aerosol properties within and outside the Oklahoma City plume to study aerosol processes within individual clouds. Preliminary discussions with the Cloud and Land Surface Interaction Campaign (CLASIC) science team have identified overlap between the science questions posed for the CLASIC Intensive Operation Period (IOP) and the proposed ASP campaign, suggesting collaboration would benefit both teams.

  13. Evaluation of dredged material proposed for ocean disposal from Red Hook/Bay Ridge project areas, New York

    Energy Technology Data Exchange (ETDEWEB)

    Pinza, M.R.; Barrows, E.S.; Borde, A.B. [Battelle/Marine Sciences Lab., Sequim, WA (United States)

    1996-09-01

    The objective of the Red HookIBay Ridge project was to evaluate proposed dredged material from these two areas to determine its suitability for unconfined ocean disposal at the Mud Dump Site. Sediment samples were collected from the Red Hook/Bay Ridge project areas. Tests and analyses were conducted. The evaluation of proposed dredged material from the Red Hook/Bay Ridge project areas consisted of bulk sediment chemical analyses, chemical analyses of dredging site water and elutriate, water-column and benthic acute toxicity tests. Twenty-four individual sediment core samples were collected from these two areas and analyzed for grain size, moisture content, and total organic carbon (TOC). Three composite sediment samples, representing Red Hook Channel and the two Bay Ridge Reaches to be dredged, were analyzed for bulk density, specific gravity, metals, chlorinated pesticides, polychlorinated biphenyl (PCB) congeners, polynuclear aromatic hydrocarbons (PAH), and 1,4-dichlorobenzene. Dredging site water and elutriate water, which is prepared from the suspended-particulate phase (SPP) of the three Red Hook Bay Ridge sediment composites, were analyzed for metals, pesticides, and PCBS. Benthic acute toxicity tests were performed. Water-column or SPP toxicity tests were performed. Bioaccumulation tests were also conducted.

  14. A Project Strategic Index proposal for portfolio selection in electrical company based on the Analytic Network Process

    Energy Technology Data Exchange (ETDEWEB)

    Smith-Perera, Aida [Universidad Metropolitana de Caracas, Departamento de Gestion Tecnologica, Caracas 1071, Edo Miranda (Venezuela); Garcia-Melon, Monica; Poveda-Bautista, Rocio; Pastor-Ferrando, Juan-Pascual [Universidad Politecnica de Valencia, Departamento de Proyectos de Ingenieria, Camino de vera s/n 46022 Valencia (Spain)

    2010-08-15

    In this paper a new approach to prioritize project portfolio in an efficient and reliable way is presented. It is based on strategic objectives of the company and multicriteria decision methods. The paper introduces a rigorous method with acceptable complexity which seeks to assist managers of a big Electrical Company of Venezuela to distribute the annual budget among the possible improvement actions to be conducted on the electrical network of Caracas. A total of 15 network improvement actions grouped into three clusters according to the strategic objectives of the company have been analyzed using the Project Strategic Index (PSI) proposed. The approach combines the use of the Analytic Network Process (ANP) method with the information obtained from the experts during the decision-making process. The ANP method allows the aggregation of the experts' judgments on each of the indicators used into one Project Strategic Index. In addition, ANP is based on utility ratio functions which are the most appropriate for the analysis of uncertain data, like experts' estimations. Finally, unlike the other multicriteria techniques, ANP allows the decision problem to be modelled using the relationships among dependent criteria. The participating experts coincided in the appreciation that the method proposed in this paper is useful and an improvement from traditional budget distribution techniques. They find the results obtained coherent, the process seems sufficiently rigorous and precise, and the use of resources is significantly less than in other methods. (author)

  15. A Project Strategic Index proposal for portfolio selection in electrical company based on the Analytic Network Process

    International Nuclear Information System (INIS)

    Smith-Perera, Aida; Garcia-Melon, Monica; Poveda-Bautista, Rocio; Pastor-Ferrando, Juan-Pascual

    2010-01-01

    In this paper a new approach to prioritize project portfolio in an efficient and reliable way is presented. It is based on strategic objectives of the company and multicriteria decision methods. The paper introduces a rigorous method with acceptable complexity which seeks to assist managers of a big Electrical Company of Venezuela to distribute the annual budget among the possible improvement actions to be conducted on the electrical network of Caracas. A total of 15 network improvement actions grouped into three clusters according to the strategic objectives of the company have been analyzed using the Project Strategic Index (PSI) proposed. The approach combines the use of the Analytic Network Process (ANP) method with the information obtained from the experts during the decision-making process. The ANP method allows the aggregation of the experts' judgments on each of the indicators used into one Project Strategic Index. In addition, ANP is based on utility ratio functions which are the most appropriate for the analysis of uncertain data, like experts' estimations. Finally, unlike the other multicriteria techniques, ANP allows the decision problem to be modelled using the relationships among dependent criteria. The participating experts coincided in the appreciation that the method proposed in this paper is useful and an improvement from traditional budget distribution techniques. They find the results obtained coherent, the process seems sufficiently rigorous and precise, and the use of resources is significantly less than in other methods. (author)

  16. Proposal for the award of a contract for the wood construction work for the Globe of Innovation project

    CERN Document Server

    2003-01-01

    This document concerns the award of a contract for the wood construction work for the Globe of Innovation project. A call for tenders (IT-3260/ST/GIR) was sent on 31 October 2003 to twelve firms in one Member State. By the closing date, CERN had received five tenders from four firms and one consortium. The Finance Committee is invited to agree to the negotiation of a contract with CIB (CH), the lowest bidder, for the wood construction work for the Globe of Innovation project for an estimated amount not exceeding 820 000 Swiss francs, not subject to revision. The firm has indicated the following distribution by country of the contract value covered by this adjudication proposal: CH - 100%.

  17. The Cognitive Behavioral Assessment (CBA Project: Presentation and Proposal for International Collaboration

    Directory of Open Access Journals (Sweden)

    Ezio Sanavio

    2013-11-01

    Full Text Available Aims: The main aim of this paper is to describe almost 30 years of work on psychological assessment using CBA, a research team, and to propose collaboration with Latin countries. Methods: The acronym CBA stands for Cognitive Behavioural Assessment and indicates both an overall approach to clinical assessment and a series of tests. Five general principles formed the basis on which the team developed their questionnaires: (1 assessment is not a passive collection of information, but an active process similar to problem-solving; (2 horizontal integration of questionnaires with other assessment methods; (3 vertical integration and hierarchical structure of assessment questionnaires; (4 idiographic perspective; (5 computer support. Results: The paper briefly presents the most important tests: CBA-2.0, a broad-spectrum Battery for patients who need counselling and/or psychotherapy; CBA-H (Hospital for both in-patients and out-patients suffering from physical illnesses; CBA-SPORT for professional athletes; CBA-Y (young people for adolescents and young adults; CBD-VE (treatment benefits to assess the effectiveness of psychological treatment. Conclusion: These questionnaires have produced over 100 research works, published in Italian journals or presented in conferences. In the near future, we expect important, radical changes and hope to create an international research milieu.

  18. Thorium utilization as a Pu-burner: proposal of Plutonium-Thorium Mixed Oxide (PT-MOX) Project

    International Nuclear Information System (INIS)

    Aizawa, Otohiko

    2000-01-01

    In this paper, a Pu-Th mixed oxide (PT-MOX) project is proposed for a thorium utilization and a plutonium burning. None of plutonium can be newly produced from PT-MOX fuel, and the plutonium mass of about 1 ton can be consumed with one reactor (total heavy metal assumed: 100 tons) for 1 year. In order to consume plutonium produced from usual Light Water Reactor, it should be better to operate one PT-MOX reactor for three to five Light Water Reactors. (author)

  19. A proposal for an infrared/optical beam line for the new Australian synchrotron project

    International Nuclear Information System (INIS)

    Creagh, D.

    2002-01-01

    Full text: In late 2001 the Premier of Victoria, Steve Bracks, announced that the Victorian Government would provide funding of $100,000,000 for the construction of an Australian National Synchrotron on a site on the Monash University campus. The design of the synchrotron and the tentative allocations of beamlines within the synchrotron were taken from the 'Boomerang' designs developed by Dr John Boldeman for the Australian Synchrotron Research Program. The formal administrative structure has recently been put in place. Committees such as the International Machine Advisory Committee (IMAC) and the National Scientific Advisory Committee (NSAC) have been formed and are actively pursuing the goals set down in the strategic plan. Meetings of the NSAC are held monthly, the fifteen members from all states and territories (except Tasmania and the Northern Territory) meeting to discuss how the scientific goals may be achieved. At the last meeting proposals were canvassed for the beamlines to be provided at the synchrotron. One of these beamlines is an IR/Optical Beamline, the subject of this paper. Spectroscopy, using photon energies from the infrared (IR) to the ultraviolet has long been an important analytical tool in scientific investigations. The study of the absorption and scattering (both elastic and Raman) of light by samples, and the fluorescence radiation emitted by samples, can give information about essential for the understanding of the chemical state of the sample, identifying chemical and mineral types present in a sample, and identifying changes in systems Areas of research which would benefit from the use of synchrotron radiation source include: cell biology, in particular the study of the uptake of drugs by cells; surficial processes, for example the in situ study of corrosion processes and the testing of anti-corrosion coatings; organic and inorganic nanotechnology; the study of bandgaps in quantum effect materials; mineralogy, for example determining

  20. A theory of blindsight--the anatomy of the unconscious: a proposal for the koniocellular projections and intralaminar thalamus.

    Science.gov (United States)

    Vakalopoulos, Costa

    2005-01-01

    This paper extends the concepts introduced by the theory of premotor relations to unconscious cognitive mechanisms. According to the theory conscious mechanisms are associated with behavioural diversity, whereas unconscious output is proposed to have an obligatory association with stereotypical behaviour. The respective processes are by definition a function of the type of reafferent motor input. Concepts of simple and complex premotor networks are introduced as a means of describing unconscious and conscious processes, respectively. Evidence shows that unconscious cognitive performance differs qualitatively from conscious mechanisms suggesting parallel processes. Although the postulated anatomical substrates for conscious and unconscious processes will function in this model as parallel segregated networks, it is proposed they are distributed throughout the same cortical areas of the brain. Motor reafference is postulated to be mediated via pallidal projections to the thalamic reticular nucleus, which is known to modulate thalamocortical pathways. The role of the koniocellular pathway of the lateral geniculate nucleus remains an enigma and has some properties in common with the well-described magnocellular and parvocellular projections. There is also much speculation about the intralaminar and midline nuclei, the so-called non-specific thalamus. The paper will examine the distinctive features of thalamocortical networks and the role of the koniocellular pathway and intralaminar nuclei (ILN) of the thalamus and suggest that they form a neuroanatomical substrate for the categorizing of unconscious cognitive processes. The ILN has unique projections back to the basal ganglia, which could serve in constraining associated neocortical networks with stereotypical behaviour and thus putative unconscious processing. Only after establishing such a theoretical framework can one hope to successfully analyze the empirical literature on the syndrome of blindsight, of which a

  1. PRELIMINARY METHODOLOGICAL PROPOSAL FOR ESTIMATING ENVIRONMENTAL FLOWS IN PROJECTS APPROVED BY THE MINISTRY OF ENVIRONMENT AND SUSTAINABLE DEVELOPMENT (MADS, COLOMBIA

    Directory of Open Access Journals (Sweden)

    Gabriel A. Pinilla Agudelo

    2014-01-01

    Full Text Available ABSTRACT A methodological proposal for estimating environmental flows in large projects approved by Agencia Nacional de Licencias Ambientales (ANLA in Colombian rivers was developed. The project is the result of an agreement between the MADS and the Universidad Nacional de Colombia, Bogotá (UNC. The proposed method begins with an evaluation of hydrological criteria,continues with a hydraulic and water quality validation, and follows with the determination of habitat integrity. This is an iterative process that compares conditions before and after the project construction and allows to obtain the magnitude of a monthly flow that, besides preserving the ecological functions of the river, guarantees the water uses downstream. Regarding to the biotic component, the proposal includes the establishment and monitoring of biotic integrity indices for four aquatic communities (periphyton, macroinvertebrates, riparian vegetation, and fish. The effects that flow reduction may produce in the medium and long term can be assessed by these indices. We present the results of applying the methodology to several projects licensed by the MADS. RESUMEN Se presenta una propuesta metodológica para estimar los caudales ambientales en grandes proyectos licenciados por la Agencia Nacional de Licencias Ambientales (ANLA de Colombia, resultado de un convenio interadministrativo suscrito entre el ahora Ministerio de Ambiente y Desarrollo Sostenible (MADS de Colombia y la Universidad Nacional de Colombia, Bogotá (UNC. El método propuesto parte de garantizar criterios hidrológicos, continúa con una validación hidráulica y de calidad del agua, sigue con la determinación de la integridad del hábitat, en un proceso iterativo que requiere evaluación para las condiciones antes y después de la construcción del proyecto y que permite establecer un caudal que, además de conservar las funciones ecológicas del río, garantiza los usos del recurso aguas abajo. Espec

  2. Evaluation of water quality conditions near proposed fish production sites associated with the Yakima Fisheries Project. Final report

    International Nuclear Information System (INIS)

    Dauble, D.d.; Mueller, R.P.; Martinson, G.A.

    1994-05-01

    In 1991, the Pacific Northwest Laboratory (PNL) began studying water quality at several sites in the Yakima River Basin for the Bonneville Power Administration. These sites were being proposed as locations for fish culture facilities as part of the Yakima Fisheries Project (YFP). Surface water quality parameters near the proposed fish culture facilities are currently suitable for fish production. Water quality conditions in the mainstream Yakima River and its tributaries are generally excellent in the upper part of the watershed (i.e., near Cle Elum), but they are only fair to poor for the river downstream of Union Gap (river mile 107). Water quality of the Naches River near Oak Flats is also suitable for fish production. Groundwater supplies near the proposed fish production facilities typically have elevated concentrations of metals and dissolved gases. These conditions can be mitigated using best engineering practices such as precipitation and degasification. Additionally, mixing with surface water may improve these conditions. Depending on the location and depth of the well, groundwater temperatures may be warmer than optimum for acclimating and holding juvenile and adult fish. Water quality parameters measured in the Yakima River and tributaries sometimes exceed the range of values described as acceptable for culture of salmonids and for the protection of other aquatic life. However, constituent concentrations are within ranges that exist in many northwest fish hatcheries. Additionally, site-specific tests conducted by PNL (i.e., live box exposures and egg incubation studies) indicate that fish can be successfully reared in surface and well water near the proposed facility sites. Thus, there appear to be no constraints to artificial production for the YFP

  3. Projected impacts of federal tax policy proposals on mortality burden in the United States: A microsimulation analysis.

    Science.gov (United States)

    Kim, Daniel

    2018-06-01

    The public health consequences of federal income tax policies that influence income inequality are not well understood. I aimed to project the impacts on mortality of modifying federal income tax structures based on proposals by two recent United States (U.S.) Presidential candidates: Donald Trump and Senator Bernie Sanders. I performed a microsimulation analysis using the latest U.S. Internal Revenue Service public-use tax file with state identifiers (2008 tax year), containing nationally-representative data from 139,651 tax returns. I considered five tax plan scenarios: 1) actual 2008 tax structures; proposals in 2016 by then-candidates 2) Trump and 3) Sanders; 4) a modified Sanders plan with higher top tax rates (75%); and 5) a modified Sanders plan with higher top rates plus revenue redistribution to lower-income households (Trump and Sanders plans, respectively. Under the modified Sanders plan including higher top rates, 68,919 (95% CI: 25,221-113,561) fewer deaths/year are projected. Under the modified Sanders plan with redistribution, 333,504 (95% CI: 192,897-473,787) fewer deaths/year are expected. Policies that both raise federal income tax rates and redistribute tax revenue could confer large reductions in the total number of annual deaths among Americans. In this era of high income inequality and growing public support to address the rich-poor gap, policymakers should consider joint federal tax and redistributive policies as levers to reduce the burden of mortality in the United States. Copyright © 2017 The Author. Published by Elsevier Inc. All rights reserved.

  4. Table - Impacts of the Proposed Transport Rule on Counties with Monitors Projected to have Ozone and/or Fine Particle Air Quality Problems

    Science.gov (United States)

    This table shows the impacts of the proposed Transport Rule on Counties with Monitors Projected to have Ozone and/or Fine Particle Air Quality Problems, both with and without the Cross-State Air Pollution Rule.

  5. The Bioinformatics of Integrative Medical Insights: Proposals for an International PsychoSocial and Cultural Bioinformatics Project

    Directory of Open Access Journals (Sweden)

    Ernest Rossi

    2006-01-01

    Full Text Available We propose the formation of an International PsychoSocial and Cultural Bioinformatics Project (IPCBP to explore the research foundations of Integrative Medical Insights (IMI on all levels from the molecular-genomic to the psychological, cultural, social, and spiritual. Just as The Human Genome Project identified the molecular foundations of modern medicine with the new technology of sequencing DNA during the past decade, the IPCBP would extend and integrate this neuroscience knowledge base with the technology of gene expression via DNA/proteomic microarray research and brain imaging in development, stress, healing, rehabilitation, and the psychotherapeutic facilitation of existentional wellness. We anticipate that the IPCBP will require a unique international collaboration of, academic institutions, researchers, and clinical practioners for the creation of a new neuroscience of mind-body communication, brain plasticity, memory, learning, and creative processing during optimal experiential states of art, beauty, and truth. We illustrate this emerging integration of bioinformatics with medicine with a videotape of the classical 4-stage creative process in a neuroscience approach to psychotherapy.

  6. The Bioinformatics of Integrative Medical Insights: Proposals for an International Psycho-Social and Cultural Bioinformatics Project

    Directory of Open Access Journals (Sweden)

    Ernest Rossi

    2006-01-01

    Full Text Available We propose the formation of an International Psycho-Social and Cultural Bioinformatics Project (IPCBP to explore the research foundations of Integrative Medical Insights (IMI on all levels from the molecular-genomic to the psychological, cultural, social, and spiritual. Just as The Human Genome Project identified the molecular foundations of modern medicine with the new technology of sequencing DNA during the past decade, the IPCBP would extend and integrate this neuroscience knowledge base with the technology of gene expression via DNA/proteomic microarray research and brain imaging in development, stress, healing, rehabilitation, and the psychotherapeutic facilitation of existentional wellness. We anticipate that the IPCBP will require a unique international collaboration of, academic institutions, researchers, and clinical practioners for the creation of a new neuroscience of mind-body communication, brain plasticity, memory, learning, and creative processing during optimal experiential states of art, beauty, and truth. We illustrate this emerging integration of bioinformatics with medicine with a videotape of the classical 4-stage creative process in a neuroscience approach to psychotherapy.

  7. Post Waterflood CO2 Miscible Flood in Light Oil, Fluvial-Dominated Deltaic Reservoir (Pre-Work and Project Proposal), Class I

    Energy Technology Data Exchange (ETDEWEB)

    Bou-Mikael, Sami

    2002-02-05

    This project outlines a proposal to improve the recovery of light oil from waterflooded fluvial dominated deltaic (FDD) reservoir through a miscible carbon dioxide (CO2) flood. The site is the Port Neches Field in Orange County, Texas. The field is well explored and well exploited. The project area is 270 acres within the Port Neches Field.

  8. Communication dated 22 September 2008 received from the Permanent Mission of Germany to the Agency regarding the German proposal on a Multilateral Enrichment Sanctuary Project

    International Nuclear Information System (INIS)

    2008-01-01

    The Secretariat has received a communication dated 22 September 2008 from the Permanent Mission of Germany, forwarding a paper outlining the German proposal on 'the Multilateral Enrichment Sanctuary Project (MESP)'. As requested in the communication, the paper, entitled 'the Multilateral Enrichment Sanctuary Project (MESP) - a Fresh Look at Ensuring Nuclear Fuel Supply' is circulated herewith for the information of Member States

  9. Post Waterflood CO2 Miscible Flood in Light Oil, Fluvial-Dominated Deltaic Reservoir (Pre-Work and Project Proposal), Class I; FINAL

    International Nuclear Information System (INIS)

    Bou-Mikael, Sami

    2002-01-01

    This project outlines a proposal to improve the recovery of light oil from waterflooded fluvial dominated deltaic (FDD) reservoir through a miscible carbon dioxide (CO2) flood. The site is the Port Neches Field in Orange County, Texas. The field is well explored and well exploited. The project area is 270 acres within the Port Neches Field

  10. Archaeological Excavation Report for Proposed Well 199-K-131 in Support of the 100-KR-4 Pump-and-Treat Project

    Energy Technology Data Exchange (ETDEWEB)

    Woody, Dave M.; Prendergast-Kennedy, Ellen L.

    2004-06-22

    An archaeological excavation was conducted at the site of proposed groundwater monitoring well 199-K-131 in support of the 100-KR-4 Pump-and-Treat Project between June 2 and 3, 2004. Excavations confirmed that there were no intact cultural deposits at the proposed well location. This report was prepared to document the findings of the test excavation.

  11. Proposal and application of an approach based on AHP and ISO/IEC 25000 to support the evaluation of the quality of project management software systems

    Directory of Open Access Journals (Sweden)

    Matheus Henrique Bartolomeu Marques Morais

    2017-06-01

    Full Text Available In the current competitive scenario, organizations are seeking to improve factors that influence the administration and the success of their projects. The adoption of a project management software suitable to organizational requirements contributes to ensure satisfactory results. In this context, this study proposes a methodology to support the quality evaluation of project management software, which is based on the AHP method (Analytic Hierarchy Process as well as on the criteria and sub-criteria of ISO/IEC 25000. The AHP method is used to define the relevance of the criteria and sub-criteria chosen. The proposed methodology was applied to an illustrative case to select the most appropriate software. The alternatives Basecamp, MS Project, Service Desk and Primavera were evaluated. Primavera and MS Project achieved the higher global performance in the process evaluation, since they fulfill 29 of 30 requirements. However, due to some particularities of the evaluated products, Primavera was selected as being the most suitable.

  12. A proposal of a beam injection device for the proton storage ring of JAERI neutron science project

    International Nuclear Information System (INIS)

    Suzuki, Yasuo

    1998-01-01

    A new injection device (a charge-exchange device) with light and magnetic field, is proposed for a proton storage ring of JAERI Neutron Science Project. This injection device is composed of a neutralizer and an ionizer. The neutralizer strips electrons of H 0 beam into H - one with the undulator magnetic field. The ionizer which is composed of undulator magnets and an optical resonator placed along a straight part in the storage ring, can ionize effectively the H 0 beam excited to n=3 level by a laser beam into H + one. Adopting the 2nd harmonics of Nd : YAG laser, the powerful laser on the market can be used, and the required items of the technological development can be minimized. The energy of the particle beam, however, should be accelerated up to 1.587 GeV by 6% increase from 1.5 GeV. In this device, the non-charge-exchange rate and beam-spill can be minimized by decreasing the deflection angle of the beam which occurs at the charge-exchange process. This method can be realized with exiting technologies and there are not any effects on the trajectory of the ring-circulating proton beam due to scatterings by the foil as the usual charge-exchange devices. This device, therefore, will be an optimal and highly effective method of the least beam-spill as the injector of the high power proton storage ring. (author)

  13. A survey of endangered waterbirds on Maui and Oahu and assessment of potential impacts to waterbirds from the proposed Hawaii Geothermal Project transmission corridor. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Evans, K.; Woodside, D.; Bruegmann, M. [Fish and Wildlife Service, Honolulu, HI (United States). Pacific Islands Office

    1994-08-01

    A survey of endangered waterbirds on Maui and Oahu was conducted during August and September 1993 to identify potential waterbird habitats within the general area of the proposed Hawaii Geothermal Project transmission corridor and to assess the potential impacts to endangered waterbird of installing and operating a high voltage transmission line from the Island of Hawaii to the islands of Oahu and Maui. Annual waterbird survey information and other literature containing information on specific wetland sites were summarized. Literature describing impacts of overhead transmission lines on birds was used to evaluate potential impacts of the proposed project on endangered waterbirds, resident wading birds, and migratory shorebirds and waterfowl. On Oahu, five wetland habitats supporting endangered Hawaiian waterbirds were identified within 2.5 miles of the proposed transmission line corridor. On Maui, three wetland habitats supporting endangered Hawaiian waterbirds were identified within the general area of the proposed transmission line corridor. Several of the wetlands identified on Oahu and Maui also supported resident wading birds and migratory shorebirds and waterfowl. Endangered waterbirds, resident wading birds, and migratory birds may collide with the proposed transmission lines wires. The frequency and numbers of bird collisions is expected to be greater on Oahu than on Maui because more wetland habitat exists and greater numbers of birds occur in the project area on Oahu. In addition, the endangered Hawaiian goose and the endangered Hawaiian petrel may be impacted by the proposed segment of the Hawaii Geothermal Project transmission line on Maui.

  14. Proposal of a model for evaluation of research and development projects in a public scientific and technological institution: a survey in CNEN

    International Nuclear Information System (INIS)

    Silva, Eduardo de Assumpcao

    2017-01-01

    Science and technology are directly related to the development of a country. The research and development projects in CNEN are financed by the direct resources of the budget of the Union and of the Development Agencies such as FINEP and CNPq. In general, project managers believe they can succeed when they complete a project on schedule, budget, and anticipated requirements, which is commonly known as a 'triple constraint' or 'iron triangle'. However, in the review of the literature, other criteria for evaluating success in projects, such as the benefits generated by society, the development of the team's capabilities, future opportunities, new technologies, among others, were verified. In this way, in order to assist the manager in the evaluation of this type of project, the present research carried out a review in the literature aiming to find concepts about success in projects and their evaluation criteria, proposed a model based on the theoretical reference and Importance and use of these criteria with the CNEN specialists, who work directly in the R and D projects of a public ICT in the nuclear area. The results showed that the criteria proposed in the model have a high degree of importance and show a decrease in the degree of utilization, suggesting that the criteria used in the model can help managers in the evaluation of these projects. (author)

  15. The Detroit Young Adult Asthma Project: Proposal for a Multicomponent Technology Intervention for African American Emerging Adults With Asthma.

    Science.gov (United States)

    MacDonell, Karen; Naar, Sylvie; Gibson-Scipio, Wanda; Bruzzese, Jean-Marie; Wang, Bo; Brody, Aaron

    2018-05-07

    complete a series of computer-delivered asthma education modules matched for length, location, and method of delivery of the intervention session. Control participants will also receive text messages between intervention sessions. Message content will be the same for all control participants and contain general facts about asthma (not tailored). It is hypothesized that youth randomized to multicomponent technology-based intervention will show improvements in medication adherence (primary outcome) and asthma control (secondary outcome) compared with comparison condition at all postintervention follow-ups (3, 6, 9, and 12 months). The proposed study was funded by NHLBI from September 1, 2016 through August 31, 2021. This project will test a brief, technology-based intervention specifically targeting adherence to asthma controller medications in an under-researched population, African American emerging adults. If successful, our multicomponent technology-based intervention aimed at improving adherence to asthma medications has the potential to improve quality of life of minority emerging adults with asthma at relatively low cost. It could eventually be integrated into clinical settings and practice to reach a large number of emerging adults with asthma. ClinicalTrials.gov NCT03121157; https://clinicaltrials.gov/ct2/show/NCT03121157 (Archived by WebCite at http://www.webcitation.org/6wq4yWHPv). ©Karen MacDonell, Sylvie Naar, Wanda Gibson-Scipio, Jean-Marie Bruzzese, Bo Wang, Aaron Brody. Originally published in JMIR Research Protocols (http://www.researchprotocols.org), 07.05.2018.

  16. UMTRA Project remedial action planning and disposal cell design to comply with the proposed EPA [Environmental Protection Agency] standards (40 CFR Part 192)

    International Nuclear Information System (INIS)

    1989-01-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project involves stabilizing 24 inactive uranium mill tailings piles in 10 states. Remedial work must meet standards established by the US Environmental Protection Agency (EPA). Remedial action must be designed and constructed to prevent dispersion of the tailings and other contaminated materials, and must prevent the inadvertent use of the tailings by man. This report is prepared primarily for distribution to parties involved in the UMTRA Project, including the US Nuclear Regulatory Commission (NRC), and states and tribes. It is intended to record the work done by the DOE since publication of the proposed EPA groundwater protection standards, and to show how the DOE has attempted to respond and react in a positive way to the new requirements that result from the proposed standards. This report discusses the groundwater compliance strategies now being defined and implemented by the DOE, and details the changes in disposal cell designs that result from studies to evaluate ways to facilitate compliance with the proposed EPA groundwater protection standards. This report also serves to record the technical advances, planning, and progress made on the UMTRA Project since the appearance of the proposed EPA groundwater protection standards. The report serves to establish, document, and disseminate technical approaches and engineering and groundwater information to people who may be interested or involved in similar or related projects. 24 refs., 27 figs., 8 tabs

  17. QMM Project. A proposal for field map measurement of the six HRS Quadrupoles in Hall A, CEBAF

    International Nuclear Information System (INIS)

    Fonvieille, H.; Quemener, G.; Vernin, P.

    1993-12-01

    The proposed measurements of the magnetic field maps of the six HRS quadrupoles in Hall A at CEBAF is summarized. The basis of the measurement using rotating coils and a preliminary design of the apparatus are presented. (author)

  18. Social conflict in the execution stage of power generation projects: theoretical elements for a social viability proposal

    Directory of Open Access Journals (Sweden)

    Vladimir Mesén Montenegro

    2014-05-01

    Full Text Available The social effects of power generation projects will be analyzed in this paper, based on the paradigms that conceived such projects and using the theoretical approaches that generate the constructive practices that cover the social world of the communities in the areas of influence and the different persons involved (participants, beneficiaries, affected parties and opponents and the origin of the different social and environmental conflicts. The article also focuses on how, within this juncture, the project is an external agent that enters the social fabric of one or more communities, generating a series of subjective and objective breakdowns, in a symbolic world of meanings, customs, traditions and forms of psychological and social relationships with the natural and human environment, which are part of the variables that favor social change.

  19. The ability to manage self-proposed projects between 1;3 and 2;0 years old: a study of inhibition and resistance to interference

    OpenAIRE

    Estanislao Pastor-Mallol; Edith Santó-Rañé

    2015-01-01

    This study examines very young children's ability to manage self-proposed projects by using the inhibitory function and resistance to interference. In a natural environment and using an observational method, we conducted a longitudinal study of a sample observed at 1;3, 1;6, 1;9 and 2;0 years old. The research was divided into two studies which followed different procedures and looked at the projects carried out, the interferences produced and the functioning of inhibition. We observed signif...

  20. 75 FR 22890 - Notice of Extension of Public Comment Period for the Proposed Keystone XL Pipeline Project Draft...

    Science.gov (United States)

    2010-04-30

    ... notice that listed the public comment meetings and additional information on the DEIS was published in.... By mail addressed to: Elizabeth Orlando, Keystone XL Project Manager, U.S. Department of State, OES... screening. Fax to: (202) 647-1052, attention Elizabeth Orlando. FOR FURTHER INFORMATION CONTACT: For...

  1. Projectables

    DEFF Research Database (Denmark)

    Rasmussen, Troels A.; Merritt, Timothy R.

    2017-01-01

    CNC cutting machines have become essential tools for designers and architects enabling rapid prototyping, model-building and production of high quality components. Designers often cut from new materials, discarding the irregularly shaped remains. We introduce ProjecTables, a visual augmented...... reality system for interactive packing of model parts onto sheet materials. ProjecTables enables designers to (re)use scrap materials for CNC cutting that would have been previously thrown away, at the same time supporting aesthetic choices related to wood grain, avoiding surface blemishes, and other...... relevant material properties. We conducted evaluations of ProjecTables with design students from Aarhus School of Architecture, demonstrating that participants could quickly and easily place and orient model parts reducing material waste. Contextual interviews and ideation sessions led to a deeper...

  2. Study for Action Plan proposal on some issues of the national nuclear infrastructure for the new research reactor project in phase 1&2

    International Nuclear Information System (INIS)

    Cao Hong Lan; Bui Dang Hanh; Nguyen Nhi Dien

    2017-01-01

    The Project on construction for a new research reactor in Vietnam is under preparation. At the same time, it is necessary to prepare a firm and comprehensive national nuclear infrastructure which is aimed to implement smoothly and ensure safety and security for the project. How is the status of the nuclear infrastructure for research reactor project in Vietnam, how can it be assessed, what is the assessment used for and what are we going to do with that? So, all of these things are the goals set out to address in this Task. However, due to time constraints and conformity with requirement of project progress, this Task assessed only 8 critical issues in infrastructure in phase 1&2, including National position; Management; Legislative framework; Regulatory framework; Human resource development; Radioactive waste; Site survey, site selection and evaluation; and Environmental protection. Conditions and criteria in the documents on milestones and assessment of the national nuclear infrastructure to support a new research reactor project of the International Atomic Energy Agency (IAEA) were used as bases for assessing the Vietnam's infrastructure status. The results of the Task are assessment and identification for gaps which need to be addressed and proposing for a plan on completing the national nuclear infrastructure for the research reactor project on 8 issues in stages 1&2. (author)

  3. Final terms of reference for the Environmental Impact Assessment (EIA) report for the proposed Suncor Energy Inc., Project Millennium, Fort McMurray, Alberta

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-03-04

    This document identifies the information that Suncor will need to prepare and submit as an Environmental Impact Assessment (EIA) report as part of its application to the Alberta Energy and Utilities Board for the construction, operation and reclamation of its proposed Millenium extension of the Steepbank Mine. The report must identify development activities, describe environmental effects, mitigation options and residual effects that are relevant to the assessment of the project. The report must also include a description of the processing facilities, mining activities, utilities and transportation. Similarly, the report must provide a full description of the environmental management systems in place, as well as details of the proposed management of air emissions, water, waste, hydrocarbons, and chemicals. The report will be made public to allow for participation from those who may be affected by the project. This includes residents and organizations in the Fort McMurray, Fort McKay, and Fort Chipewyan areas.

  4. Cultural Resources Survey and Archeological Inventory of the Proposed Carrollton Revetment Project, Orleans Parish, Louisiana, Phase 1. Volume 1 of 2

    Science.gov (United States)

    2004-11-01

    The proposed project area has a humid sub- kin ash (Fraxinus profunda ), green ash (Frax- tropical climate with prevailing southerly winds. inus...leans on June 27, 1967, is 39’ (1020 F) (Magill Salix nigra Black willow 1990:6; Trahan 1989; Peters and Beall 2002). Fraxinus profunda Pumpkin ash...In addition, the Internet radio show "New bait blue glass jar embossed "BROM... /EM...," Orleans Nostalgia" references radio advertise- refers to a

  5. Report of the International Review Committee of the joint proposal of the Japan Hadron Facility (KEK) and the Neutron Science Project (JAERI)

    International Nuclear Information System (INIS)

    1999-08-01

    The International Review Committee composed of twelve Japanese and foreign experts was set up under the Research Evaluation Committee of JAERI, and has reviewed the proposed joint project combining JAERI's Neutron Science Project and KEK's Japan Hadron Facility into one major facility. The review meeting took place on April 26-27, 1999, at JAERI Head quarters, Tokyo. According to the points of review given in advance, the review was implemented based on the joint project report submitted and presentations of both institutions. The Research Evaluation Committee received the review report and its explanations from the Review Committee on July 5. The Research Evaluation Committee has acknowledged appropriateness of the review results. This report describes the review results. (author)

  6. Land-use changes on the proposed Clinch River Breeder Reactor demonstration. Project site: 1924 to 1972

    International Nuclear Information System (INIS)

    McConathy, R.K.

    1976-02-01

    A report is presented which documents the use history of the CRBRDP site and is also the first in a series to describe ecological areas on the ERDA Oak Ridge Reservation meeting criteria for scientific study sites or natural areas worthy of preservation. The CRBRDP area under discussion is located in Roane County, Tennessee and is a part of the land purchased in 1942 by the United States Government for the Manhattan Project, now known as the ERDA Oak Ridge Reservation

  7. Overcoming Dietary Assessment Challenges in Low-Income Countries: Technological Solutions Proposed by the International Dietary Data Expansion (INDDEX) Project

    Science.gov (United States)

    Coates, Jennifer C.; Colaiezzi, Brooke A.; Bell, Winnie; Charrondiere, U. Ruth; Leclercq, Catherine

    2017-01-01

    An increasing number of low-income countries (LICs) exhibit high rates of malnutrition coincident with rising rates of overweight and obesity. Individual-level dietary data are needed to inform effective responses, yet dietary data from large-scale surveys conducted in LICs remain extremely limited. This discussion paper first seeks to highlight the barriers to collection and use of individual-level dietary data in LICs. Second, it introduces readers to new technological developments and research initiatives to remedy this situation, led by the International Dietary Data Expansion (INDDEX) Project. Constraints to conducting large-scale dietary assessments include significant costs, time burden, technical complexity, and limited investment in dietary research infrastructure, including the necessary tools and databases required to collect individual-level dietary data in large surveys. To address existing bottlenecks, the INDDEX Project is developing a dietary assessment platform for LICs, called INDDEX24, consisting of a mobile application integrated with a web database application, which is expected to facilitate seamless data collection and processing. These tools will be subject to rigorous testing including feasibility, validation, and cost studies. To scale up dietary data collection and use in LICs, the INDDEX Project will also invest in food composition databases, an individual-level dietary data dissemination platform, and capacity development activities. Although the INDDEX Project activities are expected to improve the ability of researchers and policymakers in low-income countries to collect, process, and use dietary data, the global nutrition community is urged to commit further significant investments in order to adequately address the range and scope of challenges described in this paper. PMID:28300759

  8. RAMI modeling of selected balance of plant systems for the proposed Accelerator Production of Tritium (APT) project

    International Nuclear Information System (INIS)

    Radder, J.A.; Cramer, D.S.

    1997-01-01

    In order to meet Department of Energy (DOE) Defense Program requirements for tritium in the 2005-2007 time frame, new production capability must be made available. The Accelerator Production of Tritium (APT) Plant is being considered as an alternative to nuclear reactor production of tritium, which has been the preferred method in the past. The proposed APT plant will use a high-power proton accelerator to generate thermal neutrons that will be captured in 3 He to produce tritium (3H). It is expected that the APT Plant will be built and operated at the DOE's Savannah River Site (SRS) in Aiken, South Carolina. Discussion is focused on Reliability, Availability, Maintainability, and Inspectability (RAMI) modeling of recent conceptual designs for balance of plant (BOP) systems in the proposed APT Plant. In the conceptual designs for balance of plant (BOP) systems in the proposed APT Plant. In the conceptual design phase, system RAMI estimates are necessary to identify the best possible system alternative and to provide a valid picture of the cost effectiveness of the proposed system for comparison with other system alternatives. RAMI estimates in the phase must necessarily be based on generic data. The objective of the RAMI analyses at the conceptual design stage is to assist the designers in achieving an optimum design which balances the reliability and maintainability requirements among the subsystems and components

  9. 76 FR 62066 - Phusion Projects, LLC, et al.; Analysis of Proposed Consent Order To Aid Public Comment

    Science.gov (United States)

    2011-10-06

    ..., including routine uses permitted by the Privacy Act, in the Commission's privacy policy, at http://www.ftc.gov/ftc/privacy.htm . Analysis of Agreement Containing Consent Order To Aid Public Comment The Federal... servings of alcohol in the container. Part II of the proposed order further prohibits, commencing six (6...

  10. Project To Design a Marketing Plan for Promoting Educators' Awareness of and Access to ERIC Products. Proposed Marketing Plan.

    Science.gov (United States)

    Contemporary Associates, Inc., Washington, DC.

    The proposed strategy, which is designed to maximize the effectiveness and minimize the costs of marketing the Information Analysis Products (IAPs) produced by the 16 ERIC Clearinghouses, is based on a study of the concept of centralized versus decentralized ordering of selected ERIC products. The experiment measured four variables--postage,…

  11. 77 FR 22609 - Notice of Intent To Prepare an Environmental Impact Statement for the Proposed Pan Mine Project...

    Science.gov (United States)

    2012-04-16

    ... business hours. SUPPLEMENTARY INFORMATION: Midway Gold US Inc. (Midway) proposes to construct and operate an open-pit gold mining operation, which would include open pits, a heap leach pad, waste rock dumps, and ancillary facilities. The mine would be located in the northern part of the Pancake Mountain Range...

  12. Case Study: Applying the Theory of Planned Behavior as Interventions to Increase Sponsored Project Proposal Submissions from Liberal Arts Faculty

    Science.gov (United States)

    Hartmann, Anita

    2011-01-01

    In the current economic climate, many colleges and universities face similar challenges: the need to increase external sponsorship for research activities and the need to benefit from additional indirect cost recovery. Preparing funding proposals for submission to sponsors is a faculty behavior that can be modified by applying behavioral theory to…

  13. Korea-France collaboration for the preparation of joint proposal for the OECD project on the steam explosion experiments

    International Nuclear Information System (INIS)

    Song, Jin Ho; Kim, H. D.; Kim, J. H.; Hong, S. W.; Min, B. T.; Park, I. K.

    2004-07-01

    There are some difficulties in design of the new reactor containment and in establishment of accident management strategy for operating reactors, since there exist a few phenomenological uncertainties in a steam explosion which occurs at the time of the interaction between the corium melt and coolant. So, the OECD/NEA recommended a research which could finalize the unsolved issues in a steam explosion and then an international collaborative research involving US, France, Germany, Japan and Korea, so called the SERENA (Steam Explosion Resolution for Nuclear Application) started in 2002. The first phase of this collaborative research is an analytical research and the second phase is planned to be an experimental research which will start in 2005. Korea and France agreed that both countries would cooperate in the second phase of the SERENA program at the specialist meetings and collaborative committee between the KAERI (Korea Atomic Energy Research Institute) and the CEA (Commissariat a l'Energie Atomique). This preparation research is performed in order to carry out the agreement between Korea and France and propose a collaborative research to the SERENA second phase. The contents of this research is to perform a collaborative research between Korea and France to propose an international collaborative research on a steam explosion research to the OECD. The scope includes the technical exchange for the construction of an international collaborative research and the preparation of a proposal for an international collaborative research for the OECD steam explosion program. Two steam explosion specialist meetings were held to discuss the technical issues in the TROI and KROTOS experiments. A formal accession and amendment agreement for the collaboration was contracted between the KAERI/KINS/CEA/IRSN. And the KAERI's capability to perform an international collaborative research was proved by advertizing the TROI test results to the USNRC/CSARP and JAERI. Also, the English

  14. A landscape project for the coexistence of agriculture and nature: a proposal for the coastal area of a Natura 2000 site in Sicily (Italy

    Directory of Open Access Journals (Sweden)

    Lara Riguccio

    2016-06-01

    Full Text Available Many rural coastal Mediterranean areas suffer from great anthropomorphic pressure. This is due to intensive agriculture, and construction for residential, tourism and industrial uses. The present work investigates the idea of using a landscape project in the Gulf of Gela in South Sicily to recover the dunes and the area behind them. The method used is based on the literature and will evaluate and interpret the dynamics of the landscape, so as to draw up a landscape plan, which can be used to help sustain the assets of the area, in a way, which is compatible with conserving nature. This method was tested in the LIFE11-Leopoldia project, funded by the European Union. The results of the study form part of the landscape project. This project is aimed at connecting the different productive zones in the area, protecting the natural environments and the rural historical patrimony, through combining the modern road networks with the older slower, historic infrastructure. Three different levels of landscape management are proposed: total protection (the dunes, high-level protection (the area behind the dunes where traditional agriculture is practised, buffer areas and ecological connecting areas, medium levels of protection (sustainable agriculture, green connections and ecological corridors. The key aims of the project are as follows: transversality - repairing the agricultural fabric and the relationship between the land and the sea; sustainability - recovering the environmental system and traditional activities; flexibility - agriculture with only minor environmental impact.

  15. An assessment strategy for proposals of engineering projects in the Bachelor of Biomedical Engineering Curriculum at Universidad Autónoma Metropolitana-Iztapalapa.

    Science.gov (United States)

    Castañeda-Villa, N; Jiménez-González, A; Ortiz-Posadas, M R

    2015-08-01

    Since 1974, the Bachelor of Biomedical Engineering Program (BBME) is offered at Universidad Autónoma Metropolitana-Iztapalapa, in Mexico City. By design, it must be completed in four years (12 trimesters) and, in the latter three, the senior students work on a BME project, which is done by completing three modules: Project Seminar (PS), Project on BME I and Project on BME II. In the PS module, the student must find a problem of interest in the BME field and suggest a solution through the development of an Engineering Project Proposal (EPP). Currently, the module is being taught by two faculty members of the BBME, who instruct students on how to develop their EPPs and evaluate their progress by reviewing a number of EPPs during the trimester. This generates a huge workload for the module instructors, which makes it necessary to involve more faculty members trimester-to-trimester (i.e. every 12 weeks) and, therefore, to create a set of systematic guidelines that ease the evaluation process for new instructors. Hence, the purpose of this paper is to present an assessment strategy (in the form of an assessment matrix) for the PS module as well as some preliminary results after two trimesters of its implementation.

  16. Supplement analysis for the proposed upgrades to the tank farm ventilation, instrumentation, and electrical systems under Project W-314 in support of tank farm restoration and safe operations

    International Nuclear Information System (INIS)

    1997-05-01

    The mission of the TWRS program is to store, treat, and immobilize highly radioactive tank waste in an environmentally sound, safe, and cost-effective manner. Within this program, Project W-314, Tank Farm Restoration and Safe Operations, has been established to provide upgrades in the areas of instrumentation and control, tank ventilation, waste transfer, and electrical distribution for existing tank farm facilities. Requirements for tank farm infrastructure upgrades to support safe storage were being developed under Project W-314 at the same time that the TWRS EIS alternative analysis was being performed. Project W-314 provides essential tank farm infrastructure upgrades to support continued safe storage of existing tank wastes until the wastes can be retrieved and disposed of through follow-on TWRS program efforts. Section4.0 provides a description of actions associated with Project W-314. The TWRS EIS analyzes the environmental consequences form the entire TWRS program, including actions similar to those described for Project W-314 as a part of continued tank farm operations. The TWRS EIS preferred alternative was developed to a conceptual level of detail to assess bounding impact areas. For this Supplement Analysis, in each of the potential impact areas for Project W-314, the proposed action was evaluated and compared to the TWRS EIS evaluation of the preferred alternative (Section 5.0). Qualitative and/or quantitative comparisons are then provided in this Supplement Analysis to support a determination on the need for additional National Environmental Policy Act (NEPA) analysis. Based on this Supplement Analysis, the potential impacts for Project W-314 would be small in comparison to and are bounded by the impacts assessed for the TWRS EIS preferred alternative, and therefore no additional NEPA analysis is required (Section 7.0)

  17. Preliminary draft industrial siting administration permit application: Socioeconomic factors technical report. Final technical report, November 1980-May 1982. [Proposed WyCoalGas project in Converse County, Wyoming

    Energy Technology Data Exchange (ETDEWEB)

    1982-01-01

    Under the with-project scenario, WyCoalGas is projected to make a difference in the long-range future of Converse County. Because of the size of the proposed construction and operations work forces, the projected changes in employment, income, labor force, and population will alter Converse County's economic role in the region. Specifically, as growth occurs, Converse County will begin to satisfy a larger portion of its own higher-ordered demands, those that are currently being satisfied by the economy of Casper. Business-serving and household-serving activities, currently absent, will find the larger income and population base forecast to occur with the WyCoalGas project desirable. Converse County's economy will begin to mature, moving away from strict dependence on extractive industries to a more sophisticated structure that could eventually appeal to national, and certainly, regional markets. The technical demand of the WyCoalGas plant will mean a significant influx of varying occupations and skills. The creation of basic manufacturing, advanced trade and service sectors, and concomitant finance and transportation firms will make Converse County more economically autonomous. The county will also begin to serve market center functions for the smaller counties of eastern Wyoming that currently rely on Casper, Cheyenne or other distant market centers. The projected conditions expected to exist in the absence of the WyCoalGas project, the socioeconomic conditions that would accompany the project, and the differences between the two scenarios are considered. The analysis is keyed to the linkages between Converse County and Natrona County.

  18. Ecological evaluation of proposed dredged material from Richmond Harbor Deepening Project and the intensive study of the Turning Basin

    Energy Technology Data Exchange (ETDEWEB)

    Pinza, M.R.; Mayhew, H.L.; Karle, L.M.; Kohn, N.P.; White, P.J.; Word, J.Q.; Michaels, L.L. [Battelle/Marine Sciences Lab., Sequim, WA (United States)

    1995-06-01

    Richmond Harbor is on the eastern shoreline of central San Francisco Bay and its access channels and several of the shipping berths are no longer wide or deep enough to accommodate modem deeper-draft vessels. The Water Resources Development Act of 1986 (PL99-662) authorized the US Army Corps of Engineers (USACE), San Francisco District to deepen and widen the navigation channels in Richmond Harbor. Several options for disposal of the material from this dredging project are under consideration by USACE: disposal within San Francisco Bay, at open-ocean disposal sites, or at uplands disposal sites. Purpose of this study was to conduct comprehensive evaluations, including chemical, biological, and bioaccumulation testing of sediments in selected areas of Richmond Harbor. This information was required by the Environmental Protection Agency (EPA) and USACE. Battelle/Marine Sciences Laboratory collected 20 core samples, both 4-in. and 12-in., to a project depth of -40 ft mean lower low water (MLLW) (-38 ft MLLW plus 2 ft of overdepth) using a vibratory-hammer core. These 20 field samples were combined to form five test composites plus an older bay mud (OBM) composite that were analyzed for physical/chemical parameters, biological toxicity, and tissue chemistry. Solid-phase tests were conducted with the amphipod, Rhepoxynius abronius; the clam, Macoma nasuta; and the polychaete worm, Nephtys caecoides. Suspended-particulate-phase (SPP) tests were conducted with the sanddab, Citharichthys stigmaeus; the mysid, Holmesimysis costata; and the bivalve, Mytilus galloprovincialis. Bioaccumulation of contaminants was measured in tissues of Macoma nasuta and Nereis virens. Sediments from one ocean reference sediment, and two in-bay reference sediments, were tested concurrently. Results from analysis of the five test treatments were statistically compared with the reference sediment R-OS in the first five sections of this report.

  19. Jockeying for position : how the proposed pipeline projects and route-on-route competition are shaping up in the Arctic

    International Nuclear Information System (INIS)

    Andre, H.

    2003-01-01

    This presentation included a brief historical look at pipeline proposals submitted over the years to bring Alaska and Northwest Territories gas to market. The challenges facing the early proponents of a pipeline from Prudhoe Bay to the Mackenzie Delta, such as cost, environmental impact and socio-economic impact on Aboriginals living in the Mackenzie Valley, have now been removed. Lobbying efforts by politicians in Alaska nearly succeeded in forcing an Alaska Highway gas pipeline, instead of letting market economics dictate the route. The author indicated that an Alaska pipeline would not benefit the Canadian natural gas industry, rather it would force production from the Western Canada Sedimentary Basin (WCSB) to be slashed, resulting in reduced drilling and lower royalties to government. The author suggested that Canada should not grant any permit to construct a pipeline in Canada that is destined for markets in the contiguous United States if the pipeline was in any way subsidized to disadvantage Canadian producers. The author explained why the proposal to build a standalone pipeline in the Mackenzie Valley before the Alaska Highway pipeline is not a good idea. Gas prices and pipeline tolls are the most important economic elements. The author expressed the opinion that the over the top route combined with the Mackenzie Valley route would be beneficial to both Canada and the United States for a host of reasons. figs

  20. OPG's long term management proposal for low and intermediate level radioactive waste: project description, operations

    International Nuclear Information System (INIS)

    Witzke, P.

    2011-01-01

    Although the Deep Geologic Repository (DGR) is approximately 8 years away from being placed into service, it is time to start planning for operations. Ontario Power Generation's (OPG) Nuclear Waste Management Division (NWMD) has a systematic approach to preparing for operation of any new facility that is readily applicable to the DGR. The DGR Operational Readiness Plan has been benchmarked at similar facilities in North America and Europe. The operating vision is a living model, and is constantly being reviewed and refined to align with the detailed design of the DGR as it proceeds through its phases of development. Combined with 40 years of operating surface storage facilities for the storage of Low and Intermediate Level Waste (LILW), the DGR operating vision will enable NWMD to provide meaningful input during COMS (Constructability, Operability, Maintainability, and Safety) review in the DGR project detailed-design phase in 2011/2012. A Work Breakdown Structure has been used to communicate the detail of the operating vision, and also to estimate the costs of Operational Readiness and Operations during the lifetime of the facility. (author)

  1. Economic critique of Nam Theun-Hinboun Hydropower Project and electricity development in Laos: proposal for an alternative path to development

    International Nuclear Information System (INIS)

    Adams, T.

    1996-01-01

    A proposed alternative to the development of a large-scale hydropower project in Laos was presented. The alternative is intended to help make electricity development sustainable over the long term and to benefit the citizens of Laos. The author carefully analyzed the Asian Development Bank report RRP: Laos 27325 of October 1994. He concluded that as presently constituted, the project is likely to fail as an investment and is likely to result in a significant net financial liability. Water resources are one of Laos' greatest assets and the future uses of Laotian rivers could be lost in order to achieve near-term electricity development. It was suggested that Laos should follow three key principles in the development of its electricity sector: maximize economic efficiency, ensure that the government acts as a regulator and not as an investor, and ensure the protection of property rights of citizens and investors. Relevant aspects of the experience with electricity development in Canada were also outlined

  2. Proposal to negotiate an amendment to an existing blanket purchase contract for the supply of Burndy connectors for the LHC project and LHC experiments

    CERN Document Server

    2006-01-01

    This document concerns the proposal to negotiate an amendment to an existing blanket purchase contract for the supply of Burndy connectors for the LHC project and LHC experiments. For the reasons explained in this document, the Finance Committee is invited to agree to the negotiation of an amendment to the blanket purchase contract for the supply of Burndy connectors for the LHC project and LHC experiments with the company SOURIAU (CH), for the next three years for up to 600 000 euros (954 600 Swiss francs), subject to revision for inflation from January 2007, bringing the total amount of the blanket purchase contract to a maximum amount of 1 200 000 euros (1 909 200 Swiss francs), subject to revision for inflation from January 2007. The amounts in Swiss francs have been calculated using the present rate of exchange. 2006/60/5/e

  3. The ability to manage self-proposed projects between 1;3 and 2;0 years old: a study of inhibition and resistance to interference

    Directory of Open Access Journals (Sweden)

    Estanislao Pastor-Mallol

    2015-05-01

    Full Text Available This study examines very young children's ability to manage self-proposed projects by using the inhibitory function and resistance to interference. In a natural environment and using an observational method, we conducted a longitudinal study of a sample observed at 1;3, 1;6, 1;9 and 2;0 years old. The research was divided into two studies which followed different procedures and looked at the projects carried out, the interferences produced and the functioning of inhibition. We observed significant differences in the execution of inhibition at the different age groups. We also describe general cognitive functions in terms of significant patterns, and determine that the use of inhibition is linked not only to age but also to the activity complexity level and the type of interference.

  4. Using high temperature gas-cooled reactors for energy neutral mineral development processes – A proposed IAEA Coordinated Research Project

    International Nuclear Information System (INIS)

    Haneklaus, N.; Reitsma, F.; Tulsidas, H.; Dyck, G.; Koshy, T.; Tyobeka, B.; Schnug, E.; Allelein, H-J.; Birky, B.

    2014-01-01

    Today, uranium mined from various regions is the predominant reactor fuel of the present generation of nuclear power plants. The anticipated growth in nuclear energy may require introducing uranium/thorium from unconventional resources (e.g. phosphates, coal ash or sea water) as a future nuclear reactor fuel. The demand for mineral commodities is growing exponentially and high-grade, easily-extractable resources are being depleted rapidly. This shifts the global production to low-grade, or in certain cases unconventional mineral resources, the production of which is constrained by the availability of large amounts of energy. Numerous mining processes can benefit from the use of so-called “thermal processing”. This is in particular beneficial for (1) low grade deposits that cannot be treated using the presently dominant chemical processing techniques; (2) the extraction of high purity end products; and (3) the separation of high value or unwanted impurities (e.g. uranium, thorium, rare earths, etc.) that could be used/sold, when extracted, which will result in cleaner final products. The considerably lower waste products also make it attractive compared to chemical processing. In the future, we may need to extract nuclear fuel and minerals from the same unconventional resources to make nuclear fuel- and low grade ore processing feasible and cost-effective. These processes could be sustainable only if low-cost, carbon free, reliable energy is available for comprehensive extraction of all valuable commodities, for the entire life of the project. Nuclear power plants and specifically High Temperature Gas-cooled Reactors (HTGRs) can produce this energy and heat in a sustainable way, especially if enough uranium/thorium can be extracted to fuel these reactors.

  5. A project proposal for the construction of underwater archaeological nature routes into the Protected Marine Area of Santa Maria di Castellabate

    Directory of Open Access Journals (Sweden)

    Salvatore Agizza

    2015-12-01

    Full Text Available The coast from Punta Tresino to Ogliastro at the National Park of Cilento and Vallo di Diano is rich in caves while the bottom is cloaked in seagrass meadows on which shipwrecks dating from the Roman era and World War II were found. Natural landscapes, above and below water, interspersed with eloquent archaeological landmarks: coastal quarries, a roman harbour, remains of maritime villa with aquaria for fish farming. For this multileveled territory, a project proposal for the construction of underwater archaeological nature routes which aims to promote new ways of using archaeological heritage would be desirable.

  6. Update on CNSC's readiness to regulate projects proposing the use of Small Modular Reactors (SMR)

    International Nuclear Information System (INIS)

    De Vos, M.; Lee, K.

    2014-01-01

    Over the past few years, Canadian Nuclear Security Commission (CNSC)staff have been working to identify and understand key regulatory and technical issues that may be encountered in Small Modular Reactor (SMR) deployment scenarios in Canada. This work is considered necessary not only to be ready to engage with vendors and utilities in technical and licensing discussions, but also to prepare to disseminate objective scientific, technical and regulatory information to the public. Beyond size differences, SMRs are reactor-based facilities. The main finding from CNSC's work-to-date is that most, if not all, of the regulatory issues to be addressed from a Canadian perspective are due to the alternate or novel approaches that proponents of SMRs are proposing and that present uncertainties from the perspective of proven technology or public acceptance. These uncertainties represent risks that need to be mitigated by proponents before the environmental assessment and licensing processes are initiated. Examples of alternate or novel approaches include, but are not limited to: non-traditional siting scenarios (remote regions, near industrial facilities, in urban areas); increased use of physical design measures to reduce the need for security personnel; fleet-based regional emergency planning and response; design specific passive design features; and, remote operation of the facility This paper covers two main themes: 1. CNSC staff have made significant progress in the ongoing characterization of key regulatory and licensing issues that may emerge in deployment of both large and / or small SMRs in Canada. This work informs CNSC’s regulatory framework activities. 2. Many regulatory framework development activities (e.g. REGDOCs) have either already accounted for SMR concepts in the development of requirements and guidance or are planning to do so. This includes taking into account the ability to use a graded approach. (author)

  7. Sistemática proposta para seleção de fornecedores em gestão de projetos Systematic proposal for selecting suppliers in project management

    Directory of Open Access Journals (Sweden)

    Luciana Hazin Alencar

    2007-12-01

    Full Text Available A gestão de projetos vem sendo alvo de inúmeros estudos nos últimos anos, uma vez que os projetos estão se tornando cada vez mais complexos. Os fornecedores exercem papéis cruciais na gestão de projetos, estando envolvidos em uma rede de atividades conectadas que, se não desenvolvidas de forma adequada, podem comprometer o sucesso do projeto. Dessa forma, aumenta-se a necessidade de fornecedores qualificados, comprometidos com os objetivos do cliente e capazes de empreender os projetos solicitados. A questão abordada é a seleção de fornecedores para um empreendimento que atenda aos múltiplos objetivos dos decisores (representantes do cliente, de modo que desenvolvam um trabalho conjunto, reduzindo custos e promovendo melhorias nos processos construtivos, assegurando, a qualidade do produto final. Diante da complexidade do problema, propõe-se uma sistemática para seleção de fornecedores, que considera o processo de seleção integrada da equipe do projeto, mediante a revisão bibliográfica realizada.The project management has been the target of numerous studies in recent years since projects have become increasingly complex. The suppliers play crucial roles in project management being involved in a network of connected activities, which if not developed appropriatel, can compromise the success of the project. Hence, there has been a growing need for qualified suppliers, who are committed to the client’s objectives and are able to undertake the projects requested. The question brought up is the suppliers’ selection for a project according to the multiple criteria of the decision makers (clients representation , so they can undertake an integrated work reducing costs and providing improvements in the constructive processes, assuring the quality of the final product. Due to the complexity of the problem, a systematic proposal is put forward for selecting suppliers considering an integrated selection process of the project team

  8. Evaluation of Dredged Material Proposed for Ocean Disposal from Federal Projects in New York and New Jersey and the Military Ocean Terminal (MOTBY)

    Energy Technology Data Exchange (ETDEWEB)

    Barrows, E.S.; Antrim, L.D.; Pinza, M.R.; Gardiner, W.W.; Kohn, N.P.; Gruendell, B.D.; Mayhew, H.L.; Word, J.Q.; Rosman, L.B. [Battelle Marine Sciences Laboratory, Sequim, Washington (United States)

    1996-08-01

    The U.S. Army Corps of Engineers (USACE) is authorized by Section 103 of the Marine Protection, Research, and Sanctuaries Act of 1972 (MPRSA), Public Law 92-532, and by the Clean Water Act of 1972 (CWA) and Amendments of 1977 to permit, evaluate, and regulate the disposal of dredged material in ocean waters to minimize adverse environmental effects. Compliance with the regulations of the MPRSA calls for physical and biological testing of sediment proposed for dredging prior to its disposal in ocean waters. The testing required by the MPRSA criteria is conducted under a testing manual developed by the USACE and the U.S. Environmental Protection Agency (EPA), Evaluation of Dredged Material Proposed for Ocean Disposal (Testing Manual), commonly referred to as the `Green Book.` Testing protocols in the Green Book include bulk sediment analysis, grain size analysis, elutriate testing, and biological testing. The biological testing includes bioassays for acute toxicity as well as analysis to determine bioaccumulation of certain contaminants by marine organisms. The objective of the USACE-NYD Federal Projects Program was to evaluate sediment proposed for dredging and unconfined ocean disposal at the Mud Dump Site. The results of analytical measurements and bioassays performed on the test sediments were compared with analyses of sediment from the Mud Dump Reference Site to determine whether the test sediments were acutely toxic to marine organisms or resulted in statistically significantly greater bioaccumulation of contaminants in marine organisms, relative to the reference sediment. Testing for the federal project areas was performed according to the requirements.

  9. Define Project

    DEFF Research Database (Denmark)

    Munk-Madsen, Andreas

    2005-01-01

    "Project" is a key concept in IS management. The word is frequently used in textbooks and standards. Yet we seldom find a precise definition of the concept. This paper discusses how to define the concept of a project. The proposed definition covers both heavily formalized projects and informally...... organized, agile projects. Based on the proposed definition popular existing definitions are discussed....

  10. The Off-Site Plowshare and Vela Uniform Programs: Assessing Potential Environmental Liabilities through an Examination of Proposed Nuclear Projects,High Explosive Experiments, and High Explosive Construction Activities Volume 1 of 3

    Energy Technology Data Exchange (ETDEWEB)

    Beck Colleen M,Edwards Susan R.,King Maureen L.

    2011-09-01

    This document presents the results of nearly six years (2002-2008) of historical research and field studies concerned with evaluating potential environmental liabilities associated with U.S. Atomic Energy Commission projects from the Plowshare and Vela Uniform Programs. The Plowshare Program's primary purpose was to develop peaceful uses for nuclear explosives. The Vela Uniform Program focused on improving the capability of detecting, monitoring and identifying underground nuclear detonations. As a result of the Project Chariot site restoration efforts in the early 1990s, there were concerns that there might be other project locations with potential environmental liabilities. The Desert Research Institute conducted archival research to identify projects, an analysis of project field activities, and completed field studies at locations where substantial fieldwork had been undertaken for the projects. Although the Plowshare and Vela Uniform nuclear projects are well known, the projects that are included in this research are relatively unknown. They are proposed nuclear projects that were not executed, proposed and executed high explosive experiments, and proposed and executed high explosive construction activities off the Nevada Test Site. The research identified 170 Plowshare and Vela Uniform off-site projects and many of these had little or no field activity associated with them. However, there were 27 projects that merited further investigation and field studies were conducted at 15 locations.

  11. The Off-Site Plowshare and Vela Uniform Programs: Assessing Potential Environmental Liabilities through an Examination of Proposed Nuclear Projects,High Explosive Experiments, and High Explosive Construction Activities Volume 2 of 3

    Energy Technology Data Exchange (ETDEWEB)

    Beck Colleen M.,Edwards Susan R.,King Maureen L.

    2011-09-01

    This document presents the results of nearly six years (2002-2008) of historical research and field studies concerned with evaluating potential environmental liabilities associated with U.S. Atomic Energy Commission projects from the Plowshare and Vela Uniform Programs. The Plowshare Program's primary purpose was to develop peaceful uses for nuclear explosives. The Vela Uniform Program focused on improving the capability of detecting, monitoring and identifying underground nuclear detonations. As a result of the Project Chariot site restoration efforts in the early 1990s, there were concerns that there might be other project locations with potential environmental liabilities. The Desert Research Institute conducted archival research to identify projects, an analysis of project field activities, and completed field studies at locations where substantial fieldwork had been undertaken for the projects. Although the Plowshare and Vela Uniform nuclear projects are well known, the projects that are included in this research are relatively unknown. They are proposed nuclear projects that were not executed, proposed and executed high explosive experiments, and proposed and executed high explosive construction activities off the Nevada Test Site. The research identified 170 Plowshare and Vela Uniform off-site projects and many of these had little or no field activity associated with them. However, there were 27 projects that merited further investigation and field studies were conducted at 15 locations.

  12. The Off-Site Plowshare and Vela Uniform Programs: Assessing Potential Environmental Liabilities through an Examination of Proposed Nuclear Projects,High Explosive Experiments, and High Explosive Construction Activities Volume 3 of 3

    Energy Technology Data Exchange (ETDEWEB)

    Beck Colleen M.,Edwards Susan R.,King Maureen L.

    2011-09-01

    This document presents the results of nearly six years (2002-2008) of historical research and field studies concerned with evaluating potential environmental liabilities associated with U.S. Atomic Energy Commission projects from the Plowshare and Vela Uniform Programs. The Plowshare Program's primary purpose was to develop peaceful uses for nuclear explosives. The Vela Uniform Program focused on improving the capability of detecting, monitoring and identifying underground nuclear detonations. As a result of the Project Chariot site restoration efforts in the early 1990s, there were concerns that there might be other project locations with potential environmental liabilities. The Desert Research Institute conducted archival research to identify projects, an analysis of project field activities, and completed field studies at locations where substantial fieldwork had been undertaken for the projects. Although the Plowshare and Vela Uniform nuclear projects are well known, the projects that are included in this research are relatively unknown. They are proposed nuclear projects that were not executed, proposed and executed high explosive experiments, and proposed and executed high explosive construction activities off the Nevada Test Site. The research identified 170 Plowshare and Vela Uniform off-site projects and many of these had little or no field activity associated with them. However, there were 27 projects that merited further investigation and field studies were conducted at 15 locations.

  13. Evaluation of Water Quality Conditions Near Proposed Fish Production Sites Associated with the Yakima Fisheries Project, 1991-1993 Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Dauble, Dennis D.

    1994-05-01

    In 1991, the Pacific Northwest Laboratory (PNL) began studying water quality at several sites in the Yakima River Basin for the Bonneville Power Administration. These sites were being proposed as locations for fish culture facilities as part of the Yakima Fisheries Project (YFP). Surface water quality parameters near the proposed fish culture facilities are currently suitable for fish production. Water quality conditions in the mainstream Yakima River and its tributaries are generally excellent in the upper part of the watershed (i.e., near Cle Elum), but they are only fair to poor for the river downstream of Union Gap (river mile 107). Water quality of the Naches River near Oak Flats is also suitable for fish production. Groundwater supplies near the proposed fish production facilities typically have elevated concentrations of metals and dissolved gases. These conditions can be mitigated using best engineering practices such as precipitation and degasification. Additionally, mixing with surface water may improve these conditions. Depending on the location and depth of the well, groundwater temperatures may be warmer than optimum for acclimating and holding juvenile and adult fish. Water quality parameters measured in the Yakima River and tributaries sometimes exceed the range of values described as acceptable for culture of salmonids and for the protection of other aquatic life. However, constituent concentrations are within ranges that exist in many northwest fish hatcheries. Additionally, site-specific tests conducted by PNL (i.e., live box exposures and egg incubation studies) indicate that fish can be successfully reared in surface and well water near the proposed facility sites. Thus, there appear to be no constraints to artificial production for the YFP.

  14. The Frontlines of Medicine Project: a proposal for the standardized communication of emergency department data for public health uses including syndromic surveillance for biological and chemical terrorism.

    Science.gov (United States)

    Barthell, Edward N; Cordell, William H; Moorhead, John C; Handler, Jonathan; Feied, Craig; Smith, Mark S; Cochrane, Dennis G; Felton, Christopher W; Collins, Michael A

    2002-04-01

    The Frontlines of Medicine Project is a collaborative effort of emergency medicine (including emergency medical services and clinical toxicology), public health, emergency government, law enforcement, and informatics. This collaboration proposes to develop a nonproprietary, "open systems" approach for reporting emergency department patient data. The common element is a standard approach to sending messages from individual EDs to regional oversight entities that could then analyze the data received. ED encounter data could be used for various public health initiatives, including syndromic surveillance for chemical and biological terrorism. The interlinking of these regional systems could also permit public health surveillance at a national level based on ED patient encounter data. Advancements in the Internet and Web-based technologies could allow the deployment of these standardized tools in a rapid time frame.

  15. Proposal to negotiate a collaboration agreement for the design, testing and prototyping of superconducting elements for the High Luminosity LHC (HL-LHC) project and for the production of spare quadrupole magnets for LHC

    CERN Document Server

    2016-01-01

    Proposal to negotiate a collaboration agreement for the design, testing and prototyping of superconducting elements for the High Luminosity LHC (HL-LHC) project and for the production of spare quadrupole magnets for LHC

  16. Preliminary Study of the Effect of the Proposed Long Lake Valley Project Operation on the Transport of Larval Suckers in Upper Klamath Lake, Oregon

    Science.gov (United States)

    Wood, Tamara M.

    2009-01-01

    A hydrodynamic model of Upper Klamath and Agency Lakes, Oregon, was used to explore the effects of the operation of proposed offstream storage at Long Lake Valley on transport of larval suckers through the Upper Klamath and Agency Lakes system during May and June, when larval fish leave spawning sites in the Williamson River and springs along the eastern shoreline and become entrained in lake currents. A range in hydrologic conditions was considered, including historically high and low outflows and inflows, lake elevations, and the operation of pumps between Upper Klamath Lake and storage in Long Lake Valley. Two wind-forcing scenarios were considered: one dominated by moderate prevailing winds and another dominated by a strong reversal of winds from the prevailing direction. On the basis of 24 model simulations that used all combinations of hydrology and wind forcing, as well as With Project and No Action scenarios, it was determined that the biggest effect of project operations on larval transport was the result of alterations in project management of the elevation in Upper Klamath Lake and the outflow at the Link River and A Canal, rather than the result of pumping operations. This was because, during the spring time period of interest, the amount of water pumped between Upper Klamath Lake and Long Lake Valley was generally small. The dominant effect was that an increase in lake elevation would result in more larvae in the Williamson River delta and in Agency Lake, an effect that was enhanced under conditions of wind reversal. A decrease in lake elevation accompanied by an increase in the outflow at the Link River had the opposite effect on larval concentration and residence time.

  17. A Proposal of Branding Water - Based Recreational Activities Within The Destination Management Project in The Dalaman Basin, Muğla, Turkey

    Directory of Open Access Journals (Sweden)

    Ali TÜRKER

    2014-08-01

    Full Text Available "Arrival place" (TDK, 2012 or "a place that has different natural features or attractions where visitors are interested in visiting" (Coltman, 1989: 48 were defined as destination. Nowadays this is one of the topics that attention is paid to in tourism literature. However, destination is drawn in a reg ional boundaries rather than political boundaries where tourist resources in a geographic area are clustered. This in turn necessitates the different local government units and non - governmental organizations (NGOs in acting management and marketing togeth er. Dalaman basin boundaries cover Dalaman, Ortaca and Koycegiz municipalities in the province of Mugla. Dalaman international airport is located in the area that tourists have an easy access to reach accommodation establishments soon after they land and t ourists further benefit from the region's historical and touristic values. This study has primarily presented the findings regarding Dalaman Basin Destination Management Project involving these three municipalities, the tourism business representatives, NG Os and Mugla Sıtkı Kocman University lecturers. Through this consecutive meetings among these parties involved, a main conclusion has drawn upon water - based recreational activities should be focused and these activities should be used in marketing the regi on. Further to this conclusion, these water - based activities should be branded. Within this destination management project, "Turkish Water Land" was proposed as a brand name to describe the region‟s water - based activities. The three local authorities of th e Dalaman basin unanimously agreed upon a protocol stating the roles and allocation of investments and expenditures required. Water based recreation activities are located in the region as follows: Dalaman river, Koycegiz lake, Iztuzu and Sarigerme beaches , Ekin and Sarsala bays and Dalyan canal.

  18. Metodologia para gerenciar projetos de pesquisa e desenvolvimento com foco em produtos: uma proposta Management methodology for product-oriented R&D projects: a proposal

    Directory of Open Access Journals (Sweden)

    Andréia Azevedo Pinheiro

    2006-06-01

    Full Text Available As atividades de pesquisa e desenvolvimento (P&D realizadas nos institutos públicos de pesquisa (IPPs têm como característica uma gestão arraigada nas premissas acadêmicas, que priorizam a geração e difusão do conhecimento. Em contrapartida, a necessidade de competitividade tecnológica no mercado e a pressão pela participação, como instrumentos da política pública do esforço nacional rumo à inovação, têm pressionado os IPPs para a busca por resultados mais concretos. Esse fato acarreta a geração de grandes lacunas nos processos relacionados à gestão, induzindo a uma constante necessidade de aperfeiçoamento gerencial, no sentido de criar e melhorar ferramentas que contribuam para adequá-la à nova realidade. Este artigo propõe uma metodologia de gestão de projetos de P&D, que se baseia no direcionamento dos projetos de pesquisa para a obtenção de produtos, e considera suas características multidisciplinares e interdisciplinares e a incerteza inerentes a esse processo. Essa metodologia foi desenvolvida no Instituto de Tecnologia de Fármacos da Fiocruz e é proposta como um modelo original para instituições semelhantes.The Research and Development (R&D activities carried out at public research institutes have a strongly rooted academic-like management which focuses on knowledge improvement. On the other hand, the need for technological competitiveness and contribution in the national effort towards innovation has lead Brazilian organizations to search for more concrete results: products. This fact accounts for huge gaps in management-related processes and a constant need for managerial improvements in order to generate and perfect tools suitable to a new reality. This article proposes a R&D project management methodology focused on research projects that aim at new technological products taking into consideration the multidisciplinary and interdisciplinary aspects and the uncertainty inherent to this process. It

  19. Proposed waste isolation pilot project (WIPP) and impacts in the state of New Mexico: a socio-economic analysis. Final report

    International Nuclear Information System (INIS)

    Cummings, R.D.; Burness, H.S.; Norton, R.D.

    1981-04-01

    This document is a final report for research conducted concerning the socio-economic impacts in the State of New Mexico that might attend the construction and operation of the proposed Waste Isolation Pilot Plant (WIPP). The proposed site for the WIPP, known as the Los Medanos site, is in Southeastern New Mexico's Eddy County, some 25 miles east of Carlsbad, New Mexico and some 40 miles from Hobbs, New Mexico, in adjacent Lea County. The purpose as set out in the US Department of Energy's environmental impact statements is for storage of TRU waste from the US defense program and the construction of a research and development area for experiments concerning the isolation of all types of nuclear waste in salt. The intended purpose of the study is to identify, measure (when possible) and assess the range of potential socio-economic impacts in the State that may be attributable to the WIPP. Every effort has been made by the authors to approach this task in an objective manner. In efforts to provide an objective analysis of the WIPP, however, particular attention was required in providing a comprehensive review of potential impacts. This means that however unlikely an impact might seem, the authors have purposely avoided pre-judging the potential magnitude of the impact and have applied their best efforts to measure it. On the other hnd, this study is not intended to provide a definitive calculation regarding the net balance of WIPP-related benefits and costs. To help ensure objectivity, two advisory boards, Technical Advisory Board and Public Advisory Board, were formed at the outset of the project for the purpose of providing periodic reviews of research efforts

  20. Proposal for a technical-economic and environmental evaluation projects for distributed generation; Proposta de avaliacao tecnica-economica-ambiental para projetos de geracao distribuida

    Energy Technology Data Exchange (ETDEWEB)

    Fortes, Marcio Zamboti [Universidade Severino Sombra, Vassouras, RJ (Brazil); Gouvea, Marcos Roberto [Universidade de Sao Paulo (USP), SP (Brazil)

    2008-07-01

    The multi discipline effects in engineering projects, mainly in those of infrastructure, have extended the borders of research to not only evaluate them of the conventional point of view, economic and technical, but also environmental and social. On the other hand, the investor who traditionally searched alternatives only considering the economic and financial performance currently is taken to analyze also the social and environmental aspects. The model described in this paper is a solution proposal to evaluate the merit of an enterprise of distributed generation of thermal origin, considering the economic, social and environmental aspects, using merit indexes that quantify, directly, economic aspects as capital return tax and operating income eliminates, as well as social factors like the impact in the education, health, income and employment rates and still, it verifies the attendance of the environmental restrictions. The solution presented brings a simple and clear form to attribute a merit degree of aggregate to the alternatives to embed distributed generation, considering the intensity of the subjective social responsibility of the investor. The presented model is an important contribution to stimulate a form to evaluate and to prioritize the multi discipline implementation to a distributed generation enterprise, also being able, to be used as financial index or other incentives of the sort. (author)

  1. Groundwater well inventory and assessment in the area of the proposed Normally Pressured Lance natural gas development project, Green River Basin, Wyoming, 2012

    Science.gov (United States)

    Sweat, Michael J.

    2013-01-01

    During May through September 2012, the U.S. Geological Survey, in cooperation with the Bureau of Land Management, inventoried and assessed existing water wells in southwestern Wyoming for inclusion in a possible groundwater-monitor network. Records were located for 3,282 wells in the upper Green River Basin, which includes the U.S. Geological Survey study area and the proposed Normally Pressured Lance natural gas development project area. Records for 2,713 upper Green River Basin wells were determined to be unique (not duplicated) and to have a Wyoming State Engineers Office permit. Further, 376 of these wells were within the U.S. Geological Survey Normally Pressured Lance study area. Of the 376 wells in the U.S. Geological Survey Normally Pressured Lance study area, 141 well records had sufficient documentation, such as well depth, open interval, geologic log, and depth to water, to meet many, but not always all, established monitor well criteria. Efforts were made to locate each of the 141 wells and to document their current condition. Field crews were able to locate 121 of the wells, and the remaining 20 wells either were not located as described, or had been abandoned and the site reclaimed. Of the 121 wells located, 92 were found to meet established monitor well criteria. Results of the field efforts during May through September 2012, and specific physical characteristics of the 92 wells, are presented in this report.

  2. Safety-relevant assessment concerning the proposals for investigations in proposed locations for stage 3 of the deep geological repositories project; Sicherheitstechnisches Gutachten zum Vorschlag der in Etappe 3 SGT weiter zu untersuchenden geologischen Standortgebiete - Sachplan geologische Tiefenlager, Etappe 2

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2017-04-15

    This comprehensive report published by the Swiss Federal Nuclear Safety Inspectorate ENSI examines the proposals made by the Swiss National Cooperative for the disposal of Radioactive Waste (NAGRA) concerning proposed locations for deep waste repositories. Important basic considerations to be made when narrowing down the choice of host rock types and the selection of possible locations are discussed. These include, amongst others, safety concepts for the repositories, geological models and technical feasibility of repositories in Opalinus Clay, Brown Dogger layers and marl. The properties of various host rocks are discussed. Methods to be used in choosing at least two possible sites for repositories are considered. Also, the radioactive dosage to be expected at the various sites proposed is discussed. A safety-relevant comparison of the sites is made and an overall assessment is presented. The locations proposed for surface facilities at three proposed locations are discussed. The report is completed with an appendix containing tables and a list of relevant expert reports.

  3. Proposed methodology for completion of scenario analysis for the Basalt Waste Isolation Project. [Assessment of post-closure performance for a proposed repository for high-level nuclear waste

    Energy Technology Data Exchange (ETDEWEB)

    Roberds, W.J.; Plum, R.J.; Visca, P.J.

    1984-11-01

    This report presents the methodology to complete an assessment of postclosure performance, considering all credible scenarios, including the nominal case, for a proposed repository for high-level nuclear waste at the Hanford Site, Washington State. The methodology consists of defensible techniques for identifying and screening scenarios, and for then assessing the risks associated with each. The results of the scenario analysis are used to comprehensively determine system performance and/or risk for evaluation of compliance with postclosure performance criteria (10 CFR 60 and 40 CFR 191). In addition to describing the proposed methodology, this report reviews available methodologies for scenario analysis, discusses pertinent performance assessment and uncertainty concepts, advises how to implement the methodology (including the organizational requirements and a description of tasks) and recommends how to use the methodology in guiding future site characterization, analysis, and engineered subsystem design work. 36 refs., 24 figs., 1 tab.

  4. Proposal for the risk management implementation phase in oil field development project by adding value on the refurbishment of critical equipment

    Directory of Open Access Journals (Sweden)

    Hamid Abdul

    2017-01-01

    Full Text Available Refurbishment process is a conceptual stage in product life cycle. It is utilized in existing equipment in the field by adding value to recondition and repaired equipment. The main interest of this paper is to implement and design risk management implementation phase in oil field development project on the refurbishment of critical equipment in oil and gas industry. This paper is provided base on research and experiences in risk management and learned from practical team in industry which matched by an application in oil field development project in refurbishment of critical equipment. A framework of implementation phase for risk management in oil field development project in refurbishment critical equipment were reviewed and added value on communication skills of the project team to the stakeholder and organization, which support to external body and vice-versa. Risk management framework can be used for reference of refurbishment process with simply process and developed with same concept for the next wide development project in industry.

  5. Resolution 928/003 it founds a commission with determined integration, with the proposal to do a project about hydrocarbons framework regulations

    International Nuclear Information System (INIS)

    2003-01-01

    It is proposed the formation of a commission composed of representatives of the Ministry of Energy and Mining Industry, Regulatory Unit of Energy Services and Water and the National Fuel Alcohol and Portland.

  6. Energy efficient housing in South Africa. A Research Alliance, CSIR/SUPSI project proposal for energy efficient building (housing) in South Africa

    CSIR Research Space (South Africa)

    Kuchena, J

    2010-02-01

    Full Text Available This presentation proposes energy efficient housing in South Africa, and presents the economic, social and environmental sustainability challenges it brings. The CSIR's expertise in terms of design, construction methods, material selection, home...

  7. Wyoming coal-conversion project. Final technical report, November 1980-February 1982. [Proposed WyCoalGas project, Converse County, Wyoming; contains list of appendices with title and identification

    Energy Technology Data Exchange (ETDEWEB)

    None

    1982-01-01

    This final technical report describes what WyCoalGas, Inc. and its subcontractors accomplished in resolving issues related to the resource, technology, economic, environmental, socioeconomic, and governmental requirements affecting a project located near Douglas, Wyoming for producing 150 Billion Btu per day by gasifying sub-bituminous coal. The report summarizes the results of the work on each task and includes the deliverables that WyCoalGas, Inc. and the subcontractors prepared. The co-venturers withdrew from the project for two reasons: federal financial assistance to the project was seen to be highly uncertain; and funds were being expended at an unacceptably high rate.

  8. Complementarity of technical skills with art and culture: theoretical reflections, the Talent Show Project experiment at IFRJ – campus Realengo and a proposal for its expansion

    Directory of Open Access Journals (Sweden)

    Maria Célia Dantas Pollig

    2016-12-01

    Full Text Available This paper presents the theoretical basis I have used to better understand the dimension of the task I intend to accomplish. As Educational Advisor at the Federal Institute of Education, Science and Technology of Rio de Janeiro (IFRJ, campus Realengo, my plan is to develop and expand the so called Talent Show Project, by complementing technical training, and providing opportunities for artistic and cultural expression. The study also presents several reflections for achieving the expansion of the scope of the Project intervention, which can become an institutional program developed at IFRJ.

  9. Post Waterflood CO2 Miscible Flood in Light Oil, Fluvial-Dominated Deltaic Reservoir (Pre-Work and Project Proposal - Appendix)

    Energy Technology Data Exchange (ETDEWEB)

    Bou-Mikael, Sami

    2002-02-05

    The main objective of the Port Neches Project was to determine the feasibility and producibility of CO2 miscible flooding techniques enhanced with horizontal drilling applied to a Fluvial Dominated Deltaic reservoir. The second was to disseminate the knowledge gained through established Technology Transfer mechanisms to support DOE's programmatic objectives of increasing domestic oil production and reducing abandonment of oil fields.

  10. Proposal of a new model to improve the collection of small WEEE: a pilot project for the recovery and recycling of toys.

    Science.gov (United States)

    Solé, Miquel; Watson, Jenna; Puig, Rita; Fullana-i-Palmer, Pere

    2012-11-01

    A new collection model was designed and tested in Catalonia (Spain) to foster the separate collection and recycling of electrical and electronic toys, with the participation of selected primary and secondary schools, as well as waste collection points and municipalities. This project approach is very original and important because small household WEEE has low rates of collection (16-21% WEEE within the EU or 5-7% WEEE in Spain) and no research on new approaches to enhance the collection of small WEEE is found in the literature. The project was successful in achieving enhanced toys collection and recycling rates, which went up from the national Spanish average of 0.5% toys before the project to 1.9 and 6% toys during the two project years, respectively. The environmental benefits of the campaign were calculated through a life-cycle approach, accounting for the avoided impact afforded by the reuse of the toys and the recycling of the valuable materials contained therein (such as metals, batteries and circuit boards) and subtracting the additional environmental burdens associated with the establishment of the collection campaign.

  11. Post Waterflood CO2 Miscible Flood in Light Oil, Fluvial-Dominated Deltaic Reservoir (Pre-Work and Project Proposal - Appendix); FINAL

    International Nuclear Information System (INIS)

    Bou-Mikael, Sami

    2002-01-01

    The main objective of the Port Neches Project was to determine the feasibility and producibility of CO2 miscible flooding techniques enhanced with horizontal drilling applied to a Fluvial Dominated Deltaic reservoir. The second was to disseminate the knowledge gained through established Technology Transfer mechanisms to support DOE's programmatic objectives of increasing domestic oil production and reducing abandonment of oil fields

  12. The FP7 collaborative project RECOSY - a comprehensive information management system for european disposal R and D (INMAN): a proposal for the next European framework program - 59397

    International Nuclear Information System (INIS)

    Buckau, Gunnar; ); Delos, Anne; Montoya, Vanessa

    2012-01-01

    Document available in abstract form only. Full text of publication follows: The Collaborative Project Redox phenomena Controlling Systems (RECOSY) started in 2008 falls within the EURATOM program and is implemented within the 7. Framework Program. The main objective of ReCosy is the sound understanding of redox phenomena controlling the long-term release/retention of radionuclides in nuclear waste disposal providing tools to apply the results to Performance Assessment/Safety Case. Although redox is not a new issue, different questions are still not resolved, such as, redox processes in the long-term dissolution/ chemical transformation of the radioactive waste, waste packages and engineered barriers, and migration in the far-field, including which species are formed and their respective various retention mechanisms. In order to solve this questions, the project includes i) development of advanced analytical tools, ii) investigations of processes responsible for redox control (thermodynamically and kinetically controlled processes, surface reactions and microbial processes), iii) provision of required data on redox controlling processes, and iv) response to internal/external disturbances in disposal systems to internal/external disturbances. The work program of the project is structured along six Research and Technological Development work-packages. Specific Work-packages on knowledge management, education and training (WP7) and administrative management issues (WP8) are also included in the project. In WP1, the scientific state-of-the-art and its application to Performance Assessment/Safety Case is documented and regularly up-dated, based on the safety case of the ANDRA B2 cell. WP2 deals with the development and testing of redox determination methods using different type of electrodes

  13. A proposed framework for conducting pollution prevention design assessments (P2DAs) on U.S. Department of Energy design projects

    International Nuclear Information System (INIS)

    Dorsey, J.A.

    1995-03-01

    The purpose of this manual is to provide a framework for project managers, engineers, and designers to integrate pollution prevention principles and features into DOE design projects. The framework suggested is referred to as the pollution prevention design assessment (P2DA). The P2DA is based on DOE's method for conducting pollution prevention opportunity assessments (PPOAs) on existing waste-generating operations, but the P2DA is modified because the facility or process it assesses does not physically exist during design. Before the P2DA framework is introduced in the manual, recommendations for establishing the P2DA team and budget are provided. Specific pollution prevention requirements and opportunities for each design stage as delineated in DOE Order 4700.1 Project Management System are also discussed and a sample format for drafting a P2DA report is provided in the appendix. The scope of this manual includes not only the P2DA framework, but also a background discussion of pollution prevention and related topics; the regulatory requirements mandating design for pollution prevention; the benefits and barriers of designing for pollution prevention; and the impact that pollution prevention and related environmental avoidance concepts have had on the engineering profession

  14. Study of nuclear matter in hard proton-nuclei and nuclei-nuclei collisions at the U70 accelerator (FLUKTON project proposal)

    Science.gov (United States)

    Antonov, N. N.; Baldin, A. A.; Viktorov, V. A.; Gapienko, V. A.; Gapienko, G. S.; Gres, V. N.; Ilyushin, M. A.; Korotkov, V. A.; Mysnik, A. I.; Prudkoglyad, A. F.; Pryanikov, D. S.; Semak, A. A.; Stavinsky, A. V.; Terekhov, V. I.; Uglekov, V. Ya.; Ukhanov, M. N.; Chuiko, B. V.; Shimansky, S. S.

    2017-11-01

    A two-arm spectrometer FLUKTON for investigations in the field of relativistic nuclear physics at U70 energies is proposed to be constructed on base of the existing detector SPIN (IHEP, Protvino). The main objective is to obtain new data on clusters of cold superdense nuclear matter. Interaction of a high intensity proton beam with nuclear targets and an ion beam with liquid hydrogen and nuclear targets will be studied.

  15. Report on the consultants' meeting on preparation of the proposal for a coordinated research project to update X- and γ-ray decay data standards for detector calibration

    International Nuclear Information System (INIS)

    Nichols, A.; Herman, M.

    1998-05-01

    The IAEA Nuclear Data Section has been charged by the International Nuclear Data Committee to consider the establishment of a Coordinated Research Project (CRP) to update the IAEA database of X-ray and γ-ray Standards for Detector Calibration. This CRP should re-define the radionuclides most suited for detector calibration, extending applications to safeguards, materials analysis, environmental monitoring, and medical use. This document is a report on the Consultants' Meeting held at IAEA, Vienna, between 24-25 November 1997 to assess the current needs, re-define the most suitable radionuclides, and advise the IAEA Nuclear Data Section on the need and form of such a CRP

  16. Proposal for an IAEA - sponsored project of interregional co-operation for training of nuclear scientists in developing countries, using the expertise available in the nuclear data field

    International Nuclear Information System (INIS)

    Kocherov, N.; Schmidt, J.J.

    1980-07-01

    During the Winter College on Nuclear Physics and Reactors jointly organized by the IAEA and the International Centre for Theoretical Physics (ICTP) in January - March 1980 and held at the ICTP in Trieste, a Working Group was convened from participants in the Interregional Advanced Training Course on Applications of Nuclear Theory to Nuclear Data Calculations for Reactor Design. The Working Group examined the current fast neutron nuclear data requirements for nuclear technologies and discussed possible means to meet these requirements, with a major emphasis on the possible contributions by and benefit for the developing countries. The Working Group concluded that the organisation of an IAEA-sponsored Project of Interregional Co-operation for Training of Nuclear Scientists in Developing Countries, Using the Expertise Available in the Nuclear Data Field, would be the best solution to cope with the problems in question and drafted an outline of the technical programme and organization of such a project the revised version of which is presented in this report

  17. Communication dated 9 July 2009 received from the Permanent Mission of Germany regarding the German proposal on a Multilateral Enrichment Sanctuary Project

    International Nuclear Information System (INIS)

    2009-01-01

    The Director General received a letter dated 9 July 2009 from the Resident Representative of Germany to the IAEA, transmitting the text of two draft model agreements, which are necessary to implement a Multilateral Enrichment Sanctuary Project (MESP). One model agreement, to be concluded between the Agency and interested States, provides for the establishment of a Group of Interested States and, by them, of a market-oriented Enrichment Company. The other model agreement, to be concluded between the Agency and a host state, provides for the establishment of a Multilateral Enrichment Sanctuary (MES) on a territory to be administered by the Agency, in which the Enrichment Company would be located. The letter, and as requested therein, the above mentioned draft model agreements attached thereto are herewith circulated for the information of all Member States

  18. Recommendations of «not-to-do»: Proposals of the Spanish Association of Surgeons to the project «Commitment to quality of scientific societies».

    Science.gov (United States)

    Soria-Aledo, Víctor; Romero Simó, Manuel; Balibrea, José M; Badia, Josep M

    2016-10-01

    The initiative of the Spanish Ministry of Health «Commitment to quality of scientific societies», aims to reduce unnecessary interventions of healthcare professionals. The Spanish Association of Surgeons has selected 22 experts from the different sections that have participated in the identification of 26 proposals «do not do» to be ordered by the expected impact its implementation would have according to the GRADE methodology. From these proposals, the Delphi technique was used to select 5 recommendations presented in more detail in this article. The 5 selected recommendations are: Do not perform cholecystectomy in patients with asymptomatic cholelithiasis; do not keep bladder catheterization more than 48hours; do not extend antibiotic prophylaxis treatments more than 24hours after a surgical procedure; do not perform routine antibiotic prophylaxis for uncomplicated clean and no prosthetic surgery; and do not use antibiotics postoperatively after uncomplicated appendicitis. The Spanish Association of Surgeons's participation in this campaign has allowed a reflection on those activities that do not add value in the field of surgery and it is expected that the spread of this process serves to reduce its performance. Copyright © 2016 AEC. Publicado por Elsevier España, S.L.U. All rights reserved.

  19. A proposal for a precision test of the standard model by neutrino-electron scattering (Large /hacek C/erenkov Detector Project)

    International Nuclear Information System (INIS)

    Allen, R.C.; Lu, X-Q.; Gollwitzer, K.

    1988-04-01

    A precision measurement of neutrino-electron elastic scattering from a beam stop neutrino source at LAMPF is proposed. The total error in sin 2 θ/sub W/ is estimated to be +-0.89/percent/. The experiment also will be sensitive to neutrino oscillations and supernova-neutrino bursts, and should set improved limits on the neutrino-charge radius and magnetic-dipole moment. The detector consists of a 2.5-million-gallon tank of water with approximately 14,000 photomultiplier tubes lining the surfaces of the tank. Neutrino-electron scattering events will be observed from the /hacek C/erenkov radiation emitted by the electrons in the water. 19 refs

  20. Surveys of distribution and abundance of the Hawaiian hawk within the vicinity of proposed geothermal project subzones in the District of Puna, Hawaii. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Reynolds, M.; Ritchotte, G.; Viggiano, A.; Dwyer, J.; Nielsen, B.; Jacobi, J.D. [Fish and Wildlife Service, Hawaii National Park, HI (United States). Hawaii Research Station

    1994-08-01

    In 1993, the US Fish and Wildlife Service (USFWS) entered an interagency agreement with the Department of Energy (DOE) to conduct specific biological surveys to identify potential impacts of proposed geothermal development on the biota of the east rift zone of Kilauea volcano in the Puna district on the island of Hawaii. This report presents data on the distribution, habitat use, and density of the Hawaiian hawk or `Io (Buteo solitarius). Data were collected by the USFWS to assess the potential impacts of geothermal development on `Io populations on the island of Hawaii. These impacts include degradation of potential nesting habitat and increased disturbance due to construction and operation activities. Data from these surveys were analyzed as part of an island wide population assessment conducted by the Western Foundation of Vertebrate Zoology at the request of the USFWS.

  1. Surveys of the distribution of seabirds found in the vicinity of proposed geothermal project subzones in the District of Puna, Hawaii. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Reynolds, M.; Ritchotte, G.; Viggiano, A.; Dwyer, J.; Nielsen, B.; Jacobi, J.D. [Fish and Wildlife Service, Hawaii National Park, HI (United States). Hawaii Research Station

    1994-08-01

    In 1993, the US Fish and Wildlife Service (USFWS) entered into an interagency agreement with the Department of Energy (DOE) to conduct specific biological surveys to identify potential impacts of the proposed geothermal development on the natural resources of the East Rift Zone. This report presents information from published literature information and new field data on seabird populations on the island of Hawaii. These data are analyzed with regard to potential impacts of geothermal development on seabird populations in this area. Fifteen species of seabirds, waterbirds, and shorebirds are documented or suspected of being found using habitats within or immediately adjacent to the three geothermal subzones located in the Puna district on the island of Hawai`i. Of these species, two are on the federal Endangered Species List, three are on the State of Hawaii Endangered Species List, and all 15 are protected by the federal Migratory Bird Act.

  2. Project proposals on the creation of Russian-American joint enterprise for investigation, development and manufacture of power plants on the basis of solid oxide fuel cells

    Energy Technology Data Exchange (ETDEWEB)

    Smotrov, N.V.; Kleschev, Yu.N.

    1996-04-01

    This paper describes a proposal for a joint Russian-American enterprise for performing scientific investigations, development, and manufacture of fuel cell power plants on the basis of the solid oxide fuel cell. RASOFCo. Russian-American Solid Oxide Fuel Cells Company. RASOFCo will provide the series output of the electrochemical generator (ECG) of 1kW power, then of 5kW and 10kW as well as the development and the output of 10kW power plant with the subsequent output of a power plant of greater power. An ECG based on solid oxide fuel cells uses methane as a fuel. Predicted technical characteristics, market analysis, assessment of potential demands for power plants of low power for Tyumentransgas, participants of the joint enterprise and their founding contributions, strategy for manufacture and financing, and management of RASOFCo are discussed.

  3. A proposal for a precision test of the standard model by neutrino-electron scattering (Large /hacek C/erenkov Detector Project)

    Energy Technology Data Exchange (ETDEWEB)

    Allen, R.C.; Lu, X-Q.; Gollwitzer, K.; Igo, G.J.; Gulmez, E.; Whitten, C.; VanDalen, G.; Layter, J.; Fung, Sun Yui; Shen, B.C.

    1988-04-01

    A precision measurement of neutrino-electron elastic scattering from a beam stop neutrino source at LAMPF is proposed. The total error in sin/sup 2/theta/sub W/ is estimated to be +-0.89/percent/. The experiment also will be sensitive to neutrino oscillations and supernova-neutrino bursts, and should set improved limits on the neutrino-charge radius and magnetic-dipole moment. The detector consists of a 2.5-million-gallon tank of water with approximately 14,000 photomultiplier tubes lining the surfaces of the tank. Neutrino-electron scattering events will be observed from the /hacek C/erenkov radiation emitted by the electrons in the water. 19 refs.

  4. A project proposal for the implementation of Intensity Modulated Radiation Therapy (IMRT) for treatment of tumors of the central nervous system (CNS)

    International Nuclear Information System (INIS)

    Alert Silva, Jose; Chon Rivas, Ivon; Ascension Ibarra, Yudy; Yanez Lopez, Yaima; Rodriguez Zayas, Michel; Diaz Moreno, Rogelio

    2009-01-01

    Radiotherapy, together with the surgery, one of the essential therapeutic tools in the treatment of CNS tumors. The use of radiation, can be severe sequelae affecting quality of life of the patient, organs at risk receiving high dose and advanced technique of IMRT treatment planning and allows treatments shaped fields, especially when the target of radiation is irregular, with fewer side effects by limiting the dose in the tumor tissues and organs at risk and to allow us to increase the doses in the tumor .. So we decided to develop a protocol for the implementation of IMRT, taking into account that we have the appropriate equipment, trained staff to develop this technique. The main objective of this proposal is to allow us to establish the parameters necessary to perform IMRT, and then escalate the dose of radiation to the tumor, with reduced toxicity to healthy tissues. Inclusion criteria. It included 6 patients with histological diagnosis of CNS tumors, specifically astrocytomas grade II, III and IV, glioblastoma multiforme, where radiation is the main treatment, or associated with surgery. It excludes patients who have previously received radiation therapy or are unable to receive treatment without having movements that do not suffer another debilitating disease and to sign informed consent. Be held position and will be used as masks thermo deformed stun, then planning CT performed in all cases. Be designed later volumes (GTV, CTV and PTV, and OR, as established by the ICRU reports 52 and 60, the IAEA), will define the dose, and restrictions on healthy tissue technique is defined treatment according proposed objectives in the planning system. Once approved, is made conventional simulation, verification of the treatment plan on your computer with web plates and implementation of treatment in 1220 of INOR LINAC. Be made patient-specific quality controls and verification of DRR plan once a week for each patient treated. Monitoring will be conducted weekly during

  5. A comparison between the 19th century early proposals and the 20th-21st centuries realized projects intended to contact other planets

    Science.gov (United States)

    Raulin Cerceau, Florence; Bilodeau, Bénédicte

    2012-09-01

    Methods dealing with how to contact other planets that are supposed to be inhabited by “intelligent” civilizations have begun more than one century and a half ago. The historical question has been already treated in several studies and the aim of this paper is not to provide details on that aspect. On the other hand, it could be interesting to make a comparison between the different approaches to contact planets, formulated at different epochs (even if obviously techniques were not in the same state of advancement). The most important characteristics of the earliest messages, remained only on a theoretical form, will be presented. The main features of modern messages, which have been concretely realized, will also be emphasized. Drawing a parallel between these two series of projects could demonstrate what has been considered as unavoidable by both pioneer and modern messages creators, while it has not been proved that the first ones have had any influence on the second ones. The common points emerging from this comparison could then (perhaps) help to select adequate models for an intelligible message intended to ETs, particularly concerning the language forms. Besides this, the differences could illustrate the human cultural advances in the field of METI and underline the tendencies that have been chosen in that field since the last decades.

  6. Ecological evaluation of proposed discharge of dredged material from Oakland Harbor into ocean waters (Phase 3 B of -42-foot project)

    Energy Technology Data Exchange (ETDEWEB)

    Kohn, N.P.; Ward, J.A.; Mayhew, H.L.; Word, J.Q.; Barrows, E.S.; Goodwin, S.M.; Lefkovitz, L.F. (Battelle/Marine Sciences Lab., Sequim, WA (United States))

    1992-06-01

    The Water Resources Development Act of 1986 (Public Law 99-662) authorized the US Army Corps of Engineers (USACE) San Francisco District, to deepen and widen the navigational channels of the Oakland Inner and Outer Harbors to accommodate deeper-draft vessels. The USACE is considering several disposal options for the dredged material removed during these channel improvements including open-water disposal. Dredged material proposed for open-water disposal must be evaluated to determine the potential impacts of the disposal activity on the water column and disposal site environments. The USACE requested that Battelle/Marine Sciences Laboratory (MSL) conduct studies to evaluate open-water disposal options for Oakland Harbor sediments. This request developed into the Oakland Harbor Phase III Program. This is Volume 2 of a two-volume report that presents information gathered to determine the suitability of ocean disposal of sediments dredged from Oakland Harbor. This volume contains the Appendixes (A through N), which provide details of the data analyses and full presentation of the data and results.

  7. Ecological evaluation of proposed discharge of dredged material from Oakland Harbor into ocean waters (Phase 3 B of -42-foot project). Volume 2, Appendixes

    Energy Technology Data Exchange (ETDEWEB)

    Kohn, N.P.; Ward, J.A.; Mayhew, H.L.; Word, J.Q.; Barrows, E.S.; Goodwin, S.M.; Lefkovitz, L.F. [Battelle/Marine Sciences Lab., Sequim, WA (United States)

    1992-06-01

    The Water Resources Development Act of 1986 (Public Law 99-662) authorized the US Army Corps of Engineers (USACE) San Francisco District, to deepen and widen the navigational channels of the Oakland Inner and Outer Harbors to accommodate deeper-draft vessels. The USACE is considering several disposal options for the dredged material removed during these channel improvements including open-water disposal. Dredged material proposed for open-water disposal must be evaluated to determine the potential impacts of the disposal activity on the water column and disposal site environments. The USACE requested that Battelle/Marine Sciences Laboratory (MSL) conduct studies to evaluate open-water disposal options for Oakland Harbor sediments. This request developed into the Oakland Harbor Phase III Program. This is Volume 2 of a two-volume report that presents information gathered to determine the suitability of ocean disposal of sediments dredged from Oakland Harbor. This volume contains the Appendixes (A through N), which provide details of the data analyses and full presentation of the data and results.

  8. The regulatory approach to the assessment of containment structures in the United Kingdom, with reference to the proposed Sizewell 'B' project

    International Nuclear Information System (INIS)

    Todd, I.W.

    1988-01-01

    The regulation of nuclear installations in the United Kingdom is carried out by means of a licensing system which is administered on behalf of the Health and Safety Executive (HSE) by HM Nuclear Installations Inspectorate. A major part of this process lies in the assessment of an installation's designs and safety case, which must be submitted to the Inspectorate before a licence may be granted. This paper describes the work carried out in assessing the design proposed for the containment structure of the United Kingdom's first PWR, Sizewell 'B'. The roles of the Inspectorate's Safety Assessment Principles, and the engineering judgement of the individual assessor, are discussed. The reasons behind the Inspectorate's decision to commission independent design studies of the structure are explained, and the results of these studies are presented in outline. Views are also expressed upon the validation of analytical results, quality assurance, and further work planned by the Inspectorate in this field. The paper concludes that it is the flexibility and discretion allowed by the above approach which represents the principal strength of the UK's system of regulatory assessment. (author)

  9. ERRAPRI Project: estimation of radiation risk to patients in interventional radiology, initial results and proposed levels of complexity; Proyecto ERRAPRI: estimacion del riesgo radiologico a los pacientes en radiologia intervencionista. Primeros resultados y propuestas de indices de complejidad

    Energy Technology Data Exchange (ETDEWEB)

    Ruiz Cruces, R.; Vano, E.; Hernandez-Armas, J.; Carrera, F.; Diaz, F.; Gallego Beuther, J. F.; Ruiz Munoz-Canela, J. P.; Sanchez Casanueva, R.; Perez Martinez, M.; Fernandez Soto, J. M.; Munoz, V.; Moreno, F.; Moreno, C.; Martin-Palanca, A.

    2011-07-01

    The project ERRAPRI (2009 - 2012) will assess the most relevant aspects of the radiological risk associated with interventional radiology techniques (IR) guided by fluoroscopy in a sample of Spanish hospitals of three autonomous regions. Specific objectives include: assessing procedural protocols, especially the parameters related to radiation dose and diagnostic information obtained to establish balances cost (radiation risk) benefit to the procedures evaluated, and propose an index of complex procedures on several levels, based on the difficulty of making the same, assessing its relationship with the radiation dose values.

  10. New strategies to ensure good patient–physician communication when treating adolescents and young adults with cancer: the proposed model of the Milan Youth Project

    Directory of Open Access Journals (Sweden)

    Magni MC

    2015-08-01

    Full Text Available Maria Chiara Magni,1 Laura Veneroni,1 Carlo Alfredo Clerici,2 Tullio Proserpio,3 Giovanna Sironi,1 Michela Casanova,1 Stefano Chiaravalli,1 Maura Massimino,1 Andrea Ferrari1 1Pediatric Oncology Unit, Fondazione IRCCS Istituto Nazionale Tumori, Milan, Italy; 2Department of Pathophysiology and Transplantation, University of Milan, Milan, Italy; 3Pastoral Care Unit, Fondazione IRCCS Istituto Nazionale Tumori, Milan, Italy Abstract: Adolescence is a particularly complex time of life, entailing physiological, psychological, and social changes that further the individual's cognitive, emotional, and social growth. Being diagnosed with cancer at this time can have important consequences on an individual's emotional and physical development, and adolescent and young adult cancer patients have particular medical and psychosocial needs. Patient–physician communications are important in any clinical relationship, but fundamental in the oncological sphere because their quality can affect the patient–physician relationship, the therapeutic alliance, and patient compliance. A major challenge when dealing with adolescent and young adult patients lies in striking the right balance between their need and right to understand their disease, treatment, and prognosis, and the need for them to remain hopeful and to protect their emotional sensitivity. We herein describe the activities of the Youth Project of the Istituto Nazionale Tumori in Milan, Italy in order to share a possible model of interaction with these special patients and the tactics our group has identified to help them communicate and share their thoughts. This model implies not only the involvement of a multidisciplinary team, including psychologists and spirituality experts, but also the constitution of dedicated creative activities to give patients the opportunity to express feelings they would otherwise never feel at ease putting into words. These efforts seek the goal to minimize the potentially

  11. Quality of surface water and ground water in the proposed artificial-recharge project area, Rillito Creek basin, Tucson, Arizona, 1994

    Science.gov (United States)

    Tadayon, Saeid

    1995-01-01

    Controlled artificial recharge of surface runoff is being considered as a water-management technique to address the problem of ground-water overdraft. The planned use of recharge facilities in urban areas has caused concern about the quality of urban runoff to be recharged and the potential for ground-water contamination. The proposed recharge facility in Rillito Creek will utilize runoff entering a 1-mile reach of the Rillito Creek between Craycroft Road and Swan Road for infiltration and recharge purposes within the channel and excavated overbank areas. Physical and chemical data were collected from two surface-water and two ground-water sites in the study area in 1994. Analyses of surface-water samples were done to determine the occurrence and concentration of potential contaminants and to determine changes in quality since samples were collected during 1987-93. Analyses of ground-water samples were done to determine the variability of ground-water quality at the monitoring wells throughout the year and to determine changes in quality since samples were collected in 1989 and 1993. Surface-water samples were collected from Tanque Verde Creek at Sabino Canyon Road (streamflow-gaging station Tanque Verde Creek at Tucson, 09484500) and from Alamo Wash at Fort Lowell Road in September and May 1994, respectively. Ground-water samples were collected from monitoring wells (D- 13-14)26cbb2 and (D-13-14)26dcb2 in January, May, July, and October 1994. In surface water, calcium was the dominant cation, and bicarbonate was the dominant anion. In ground water, calcium and sodium were the dominant cations and bicarbonate was the dominant anion. Surface water in the area is soft, and ground water is moderately hard to hard. In surface water and ground water, nitrogen was found predominantly as nitrate. Concentrations of manganese in ground-water samples ranged from 60 to 230 micrograms per liter and exceeded the U.S. Environmental Protection Agency secondary maximum contaminant

  12. Proposed Darlington generating station

    International Nuclear Information System (INIS)

    1975-05-01

    The proposed Darlington GS A project, consisting of four 850 MW CANDU-type reactors, is described. Construction and operation will cause environmental changes with regard to air, water, aquatic life, the site area, safety and noise, and the predicted changes are described. (E.C.B.)

  13. Postdoc Proposal

    Energy Technology Data Exchange (ETDEWEB)

    Dorhout, Jacquelyn Marie [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2017-11-21

    The goal of this project is to determine whether variables such as the molarity of nitric acid (HNO3), temperature, and surface characteristics of uranium materials have an effect on the fractionation of 15N between the solution and vapor phases.

  14. Thesis Proposal

    DEFF Research Database (Denmark)

    Sloth, Erik

    2010-01-01

    Strukturen i Thesis proposal er følgende: Først præsenteres mine konkrete empiriske forskningsprojekter som skal munde ud i afhandlingens artikler. Jeg præsenterer herefter de teoretiske overvejelser omkring oplevelsesbegrebet og forbrugerkulturteori som danner baggrund for at jeg er nået frem til...

  15. Natural Programming: Project Overview and Proposal

    National Research Council Canada - National Science Library

    Myers, Brad

    1998-01-01

    End-users must write programs to control many different kinds of applications. Examples include multimedia authoring, controlling robots, defining manufacturing processes, setting up simulations, programming agents, scripting, etc...

  16. Report made on behalf of the parity mixed commission in charge of proposing a text about the dispositions of the project of energy orientation law remaining to be discussed

    International Nuclear Information System (INIS)

    2005-01-01

    The project of energy orientation law aims at fixing the main principles of the French energy policy for the next decades. It foresees: the re-launching of the French nuclear program (building of an experimental European pressurized reactor (EPR)), the reinforcement of the mastery of energy demand (3% per year, creation of energy saving certificates and reinforcement of buildings energy efficiency rules), and the sustain of renewable energies development. This document presents, first, a direct comparison, article by article, of the text adopted in second lecture by the House of Commons, with the text adopted in second lecture by the Senate. Then, a text is proposed for the last dispositions that remained to be discussed and is presented in the second part of the report. (J.S.)

  17. Report made on behalf of the parity mixed commission in charge of proposing a text about the dispositions of the project of energy orientation law remaining to be discussed; Rapport fait au nom de la commission mixte paritaire (1) chargee de proposer un texte sur les dispositions restant en discussion du projet de loi d'orientation sur l'energie

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2005-07-01

    The project of energy orientation law aims at fixing the main principles of the French energy policy for the next decades. It foresees: the re-launching of the French nuclear program (building of an experimental European pressurized reactor (EPR)), the reinforcement of the mastery of energy demand (3% per year, creation of energy saving certificates and reinforcement of buildings energy efficiency rules), and the sustain of renewable energies development. This document presents, first, a direct comparison, article by article, of the text adopted in second lecture by the House of Commons, with the text adopted in second lecture by the Senate. Then, a text is proposed for the last dispositions that remained to be discussed and is presented in the second part of the report. (J.S.)

  18. Proposal of a New Public Health End of Life approach for Brazil: how the Project EstaraoSeuLado-Primary Palliative Care is working and how it can help.

    Science.gov (United States)

    Corrêa, Santiago

    2018-01-01

    Brazil has 206 million people, and 1.2 million deaths and 600,000 new cases of cancer per year. Palliative Care services are patchily distributed. The Family Health Strategy, made up from 41,000 primary care teams across Brazil forms a comprehensive primary care network. The Project EstaraoSeuLado-Primary Palliative Care developed working from Community Centers. We created a model based on compassionate communities, with community carers working alongside primary care teams. We identified people who need palliative care, gave them specific care and enrolled their carers into a program of monthly meetings called "Comunidade Cuidador". We discussed caring at end of life and provided skills training. During 2015 we ran 8 training programmes with an average of 10 carers. The major themes of discussion were carer burnout, dealing with denial and skills needed daily. The effect of these meetings was better relations between carers and professionals with expansion of the naturally occurring supportive network. The results of this project have been remarkable. The joint working of professionals and supportive networks together is recognised as being transformational. Carers themselves spread this approach by recommending it to others they know with life limiting illness. We will discuss the model and how it can be replicated more broadly across Brazil. Family Health teams can use tools of identification, evaluation and assessment working with networks including the community as an important part. We will propose a new model of End-of-Life Care to be adopted as national policy. We have implemented a compassionate community programme in the area of Rio Grande in Brazil. This has been a combination of primary care working in harmony with communities, providing education, resources and training to enhance the skill of communities to care for their dying. This is a necessary solution for Brazil, where resources and access to healthcare is limited. Our model is successful and

  19. Watchdog Project

    Energy Technology Data Exchange (ETDEWEB)

    Smith, Rhett [Schweitzer Engineering Laboratories, Inc., Pullman, WA (United States); Campbell, Jack [CenterPoint Energy Houston Electric, TX (United States); Hadley, Mark [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2016-12-30

    The Watchdog Project completed 100% of the project Statement of Project Objective (SOPO). The Watchdog project was a very aggressive project looking to accomplish commercialization of technology that had never been commercialized, as a result it took six years to complete not the original three that were planned. No additional federal funds were requested from the original proposal and SEL contributed the additional cost share required to complete the project. The result of the Watchdog Project is the world’s first industrial rated Software Defined Network (SDN) switch commercially available. This technology achieved the SOPOO and DOE Roadmap goals to have strong network access control, improve reliability and network performance, and give the asset owner the ability to minimize attack surface before and during an attack. The Watchdog project is an alliance between CenterPoint Energy Houston Electric, Pacific Northwest National Laboratories (PNNL), and Schweitzer Engineering Laboratories, Inc. (SEL). SEL is the world’s leader in microprocessor-based electronic equipment for protecting electric power systems. PNNL performs basic and applied research to deliver energy, environmental, and national security for our nation. CenterPoint Energy is the third largest publicly traded natural gas delivery company in the U.S and third largest combined electricity and natural gas delivery company. The Watchdog Project efforts were combined with the SDN Project efforts to produce the entire SDN system solution for the critical infrastructure. The Watchdog project addresses Topic Area of Interest 5: Secure Communications, for the DEFOA- 0000359 by protecting the control system local area network itself and the communications coming from and going to the electronic devices on the local network. Local area networks usually are not routed and have little or no filtering capabilities. Combine this with the fact control system protocols are designed with inherent trust the control

  20. Proposal of a model for evaluation of research and development projects in a public scientific and technological institution: a survey in CNEN; Proposta de modelo de avaliacao de projetos de pesquisa e desenvolvimento em uma instituicao cientifica e tecnologica publica da area nuclear: um survey na CNEN

    Energy Technology Data Exchange (ETDEWEB)

    Silva, Eduardo de Assumpcao

    2017-11-01

    Science and technology are directly related to the development of a country. The research and development projects in CNEN are financed by the direct resources of the budget of the Union and of the Development Agencies such as FINEP and CNPq. In general, project managers believe they can succeed when they complete a project on schedule, budget, and anticipated requirements, which is commonly known as a 'triple constraint' or 'iron triangle'. However, in the review of the literature, other criteria for evaluating success in projects, such as the benefits generated by society, the development of the team's capabilities, future opportunities, new technologies, among others, were verified. In this way, in order to assist the manager in the evaluation of this type of project, the present research carried out a review in the literature aiming to find concepts about success in projects and their evaluation criteria, proposed a model based on the theoretical reference and Importance and use of these criteria with the CNEN specialists, who work directly in the R and D projects of a public ICT in the nuclear area. The results showed that the criteria proposed in the model have a high degree of importance and show a decrease in the degree of utilization, suggesting that the criteria used in the model can help managers in the evaluation of these projects. (author)

  1. A PROPOSAL OF MODEL OF ANALYSIS OF THE TRANSITION FROM SCHOOL TO ACTIVE LIFE OF ECONOMISTS BASED ON INTER-REGIONAL LABOUR MARKET PARTNERSHIP. STUDY CASE OF PRACTEAM PROJECT

    Directory of Open Access Journals (Sweden)

    Chirila Lavinia

    2012-12-01

    Full Text Available In the last years, the integration of young people into the labour market has become more difficult, being accomplished in a gradual, complex and less uniform way comparatively to the years prior to the crises. The rate of youth employment is much lower than among other categories of population, and the insertion of young people on the labour market has become a difficult process, both in Romania and in the European Union, process that is characterised especially through raising the period of time passed from the moment of graduating from school to the moment of finding the first ‘significant’ workplace (for at least six months and with a length of at least 20 hours of work per week, preferably, from qualitative point of view, in accordance to the qualification obtained. In this context, in order to analyse the way in which the integration of young people into the labour market is done in Romania, the present paper makes, in the first part, a short theoretic incursion regarding the main theories referring to youth employment, transition from school to active life and, more specific, transition from higher education to employment, the main determinants of the transition from school to active life and the way in which the process is affected by the tendencies on the labour market, the ways of measurement and evaluation used up to the present etc. In the second part, the paper tries to propose a research methodology of the transition from higher education in the field of economics to employment, analyse that will be carried out in the project called „The practice of economist students. An inter-regional partnership on the labour market between universities and the business environment" (PRACTeam in the purpose of creating policy and strategy recommendations for diminishing the difficulties felt by young people in the process of transition from school to active life.

  2. Implementing an EU system of accounting for ecosystems and their services. Initial proposals for the implementation of ecosystem services accounts (Report under phase 2 of the knowledge innovation project on an integrated system of natural capital and ecosystem services accounting in the EU)

    OpenAIRE

    LA NOTTE ALESSANDRA; VALLECILLO RODRIGUEZ SARA; POLCE CHIARA; ZULIAN GRAZIA; MAES JOACHIM

    2017-01-01

    The Knowledge Innovation Project on an Integrated system of Natural Capital and ecosystem services Accounting (KIP INCA) aims to work in line with the UN System of Environmental-Economic Accounting- Experimental Ecosystem Accounts (SEEA EEA) and also to propose how the approaches to accounting can be further developed based on experience in the EU. The Technical Recommendations of SEEA EEA make proposals on how to develop accounting tables of ecosystem extent, asset, condition and service sup...

  3. Project mobilisation

    International Nuclear Information System (INIS)

    Clark, J.; Limbrick, A.

    1996-01-01

    This paper identifies and reviews the issues to be addressed and the procedures to be followed during the mobilisation of projects using LFG as an energy source. Knowledge of the procedures involved in project mobilisation, their sequence and probable timescales, is essential for efficient project management. It is assumed that the majority of projects will be situated on existing, licensed landfill sites and, in addition to complying with the relevant conditions of the waste management licence and original planning consent, any proposed developments on the site will require a separate planning consent. Experience in the UK indicates that obtaining planning permission rarely constitutes a barrier to the development of schemes for the utilisation of LFG. Even so, an appreciation of the applicable environmental and planning legislation is essential as this will enable the developer to recognise the main concerns of the relevant planning authority at an early stage of the project, resulting in the preparation of an informed and well-structured application for planning permission. For a LFG utilisation scheme on an existing landfill site, the need to carry out an environmental assessment (EA) as part of the application for planning permission will, in vitually all cases, be discretionary. Even if not deemed necessary by the planning authority, an EA is a useful tool at the planning application stage, to identify and address potential problems and to support discussions with bodies such as the Environment Agency, from whom consents or authorisations may be required. Carrying out an EA can thus provide for more cost-effective project development and enhanced environmental protection. Typically, the principal contractual arrangements, such as the purchase of gas or the sale of electricity, will have been established before the project mobilisation phase. However, there are many other contractural arrangements that must be established, and consents and permits that may be

  4. Around the laboratories: Rutherford: Successful tests on bubble chamber target technique; Stanford (SLAC): New storage rings proposal; Berkeley: The HAPPE project to examine cosmic rays with superconducting magnets; The 60th birthday of Professor N.N. Bogolyubov; Argonne: Performance of the automatic film measuring system POLLY II

    CERN Multimedia

    1969-01-01

    Around the laboratories: Rutherford: Successful tests on bubble chamber target technique; Stanford (SLAC): New storage rings proposal; Berkeley: The HAPPE project to examine cosmic rays with superconducting magnets; The 60th birthday of Professor N.N. Bogolyubov; Argonne: Performance of the automatic film measuring system POLLY II

  5. Swedish projects

    International Nuclear Information System (INIS)

    Thunell, J.

    1992-01-01

    A description is given of research activities, concerning heating systems, which were carried out in Sweden during 1991. The main subject areas dealt with under the gas technology group within the area of heating systems were catalytic combustion, polyethylene materials, and gas applications within the paper and pulp industries. A list is given of the titles of project reports published during 1991 and of those begun during that year. Under the Swedish Centre for Gas Technology (SGC), the main areas of research regarding gas applications were polyethylene materials, industrial applications and the reduction of pollutant emissions. A detailed list is given of research projects which were in progress or proposed by March 1992 under the heating system gas technology research group in Sweden. This list also presents the aims and descriptions of the methods, etc. (AB)

  6. ASEAN projects reviewed.

    Science.gov (United States)

    1980-01-01

    The ASEAN Population Expert Group met in Manila and was followed by a meeting of the ASEAN heads of population programs, during the period November 5-10, 1979. Heads of population programs from Indonesia, Malaysia, Singapore, Thailand, and the Philippines attended. The meetings were held to review progress-to-date on phase 1 projects and to consider the development of an expanded population program. 5 projects funded by UNFPA are reviewed in tabular form with the project, the sponsoring country, date of implementation, data analysis, and date of completion. Suggestions were made for improving and extending these projects and it was also suggested that all projects being developed and proposed should include a section on use of research. 7 new projects were proposed as phase 2 projects. The 1st, sponsored by Malaysia, deals with women in development; project 2, lead by Thailand, will investigate population movement and its effect on development; project 3, led by the Philippines, will develop and strengthen national population information systems and networks in ASEAN countries; project 4, led by Indonesia, is directed towards institutional development and exchanges of personnel; project 5, led by the Philippines, will examine population and development dynamics and the man/resources balance; project 6, led by Thailand, will develop ASEAN social indicators; and project 7, led by Indonesia and Malaysia, will make a comprehensive analysis of existing medical/health care and family planning systems. It was recommended that an executive director of the proposed ASEAN population coordination unit should be appointed to expedite the recommendations of the meeting related to preparation and submission of phase 2 project proposals.

  7. Managemant of NASA's major projects

    Science.gov (United States)

    James, L. B.

    1973-01-01

    Approaches used to manage major projects are studied and the existing documents on NASA management are reviewed. The work consists of: (1) the project manager's role, (2) request for proposal, (3) project plan, (4) management information system, (5) project organizational thinking, (6) management disciplines, (7) important decisions, and (8) low cost approach.

  8. 76 FR 5580 - Eagle Crest Energy Company; Notice of Applicant-Proposed Water Pipeline Route for the Proposed...

    Science.gov (United States)

    2011-02-01

    ... Energy Company; Notice of Applicant-Proposed Water Pipeline Route for the Proposed Eagle Mountain Pumped... Hydroelectric Project (Eagle Mountain Project). This notice describes the water supply pipeline route proposed... property that would be crossed by the proposed water supply pipeline. We are currently soliciting comments...

  9. EDUCATIONAL PROJECTS STAKEHOLDER MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Юлія Юріївна ГУСЄВА

    2016-02-01

    Full Text Available An approach based on an integration of requirements breakdown structure and work breakdown structure of the project is proposed. It can complement existing methods of project stakeholders classification with the indicator of resource input, which can be defined in monetary terms. A method of requirements monitoring is proposed, which allows you to track the requirements of project stakeholders over time according to the actual amount of resources spent by analogy with the earned value method. Proposed indexes are the basis not only for monitoring but for the forecast of the project. The need of creating of a mechanism for getting baseline data taking into account the existence of different types of requirements of project stakeholders is grounded.

  10. Proposal for Modified Damage Probability Distribution Functions

    DEFF Research Database (Denmark)

    Pedersen, Preben Terndrup; Hansen, Peter Friis

    1996-01-01

    Immidiately following the Estonia disaster, the Nordic countries establishe a project entitled "Safety of Passenger/RoRo Vessels" As part of this project the present proposal for modified damage stability probability distribution functions has been developed. and submitted to "Sub-committee on st......Immidiately following the Estonia disaster, the Nordic countries establishe a project entitled "Safety of Passenger/RoRo Vessels" As part of this project the present proposal for modified damage stability probability distribution functions has been developed. and submitted to "Sub...

  11. Specific safety measures for emergency lanes and shoulders of motorways : a proposal for motorways' authorities in the framework of the European research project Safety Standards for Road Design and Redesign SAFESTAR, Workpackage 1.1.

    NARCIS (Netherlands)

    Braimaister, L.

    1999-01-01

    This workpackage is one of seven workpackages of the European SAFESTAR project, launched by DG VII. Directing on safety standards and recommendations for the Trans-European Roadway Network (TERN), the workpackage considered safety measures on emergency lanes (stopping strips), which are inherent

  12. Communication dated 30 May 2008 received from the Permanent Mission of the Federal Republic of Germany to the Agency with regard to the German proposal for a Multilateral Enrichment Sanctuary Project

    International Nuclear Information System (INIS)

    2008-01-01

    The Secretariat has received a communication dated 30 May 2008 from the Permanent Mission of the Federal Republic of Germany, attaching a document entitled 'Ensuring Access to Nuclear Fuel and Enrichment Services Multilateral Enrichment Sanctuary Project (MESP)'. As requested in that communication, the document is herewith circulated for the information of Member States

  13. Photovoltaic demonstration projects

    Energy Technology Data Exchange (ETDEWEB)

    Kaut, W [Commission of the European Communities, Brussels (Belgium); Gillett, W B; Hacker, R J [Halcrow Gilbert Associates Ltd., Swindon (GB)

    1992-12-31

    This publication, comprising the proceedings of the fifth contractor`s meeting organized by the Commission of the European Communities, Directorate-General for Energy, provides an overview of the photovoltaic demonstration projects which have been supported in the framework of the energy demonstration programme since 1983. It includes reports by each of the contractors who submitted proposals in 1987 and 1988, describing progress within their projects. Projects accepted from earlier calls for proposals and not yet completed were reviewed by a rapporteur and are discussed in the summary section. The results of the performance monitoring of all projects and the lessons drawn from the practical experience of the projects are also presented in the summaries and conclusions. Contractors whose projects were submitted in 1989 were also present at the meeting and contributed to the reported discussions. This proceeding is divided into four sessions (General, Housing, technical presentations, other applications) and 24 papers are offered.

  14. Return on investment (ROI) proposal preparation guide

    International Nuclear Information System (INIS)

    Valero, O.J.

    1998-01-01

    The ROI Proposal Preparation Guide is a tool to assist Hanford waste generators in preparing ROI proposal forms for submittal to Department of Energy, Richland Operations Office (DOE/RL) for funding. The guide describes the requirements for submitting an ROI proposal and provides examples of completed ROI forms. The intent is to assist waste generators in identifying projects that meet the criteria, provide information necessary to complete the ROI forms, and submit a proposal that is eligible to receive funding

  15. How to write a research proposal?

    OpenAIRE

    K Sudheesh; Devika Rani Duggappa; S S Nethra

    2016-01-01

    Writing the proposal of a research work in the present era is a challenging task due to the constantly evolving trends in the qualitative research design and the need to incorporate medical advances into the methodology. The proposal is a detailed plan or ?blueprint? for the intended study, and once it is completed, the research project should flow smoothly. Even today, many of the proposals at post-graduate evaluation committees and application proposals for funding are substandard. A search...

  16. Classifying IS Project Problems

    DEFF Research Database (Denmark)

    Munk-Madsen, Andreas

    2006-01-01

    The literature contains many lists of IS project problems, often in the form of risk factors. The problems sometimes appear unordered and overlapping, which reduces their usefulness to practitioners as well as theoreticians. This paper proposes a list of criteria for formulating project problems...

  17. Project Notes

    Science.gov (United States)

    School Science Review, 1978

    1978-01-01

    Presents sixteen project notes developed by pupils of Chipping Norton School and Bristol Grammar School, in the United Kingdom. These Projects include eight biology A-level projects and eight Chemistry A-level projects. (HM)

  18. Proposed underground gasification. [United Kingdom

    Energy Technology Data Exchange (ETDEWEB)

    1986-05-01

    An underground coal gasification experiment which could provide the key to recovering the energy in millions of tonnes of otherwise inaccessible undersea coal reserves is proposed by the NCB. The Board's Headquarters Technical Department hope to carry out a field trial in a six foot thick coal seam about 2000 feet beneath a former wartime airfield near the hamlet of Ossington near Newark, Notts, UK. This paper describes briefly the proposed project, which could cost up to 15 million pounds over five years. It has the backing and financial support of the European Economic Community.

  19. A proposed groundwater management framework for municipalities ...

    African Journals Online (AJOL)

    A proposed groundwater management framework for municipalities in South Africa. ... Hence, the Water Research Commission (WRC) has commissioned a project ... and available tools to achieve sustainable groundwater management reflect ...

  20. Project studies and engaged scholarship

    DEFF Research Database (Denmark)

    Geraldi, Joana; Söderlund, Jonas

    2016-01-01

    and to rejuvenate these research directions. Design/methodology/approach The authors propose the umbrella term: “project studies” to denote the research related to projects and temporary organizing. Project studies is conceived not only as a body of research, but also as a social process embedded in research...... scholars, who’s “job” goes beyond the writing of articles and research applications, and includes shaping discourses of project research, nurturing new project scholars, contributing to project practice and carefully considering the legacy of projects and project studies in society. Originality......Purpose In 2006, the “Rethinking Project Management” network called for a paradigm shift in project research, and proposed five research directions. The directions inspired research and marked a milestone in the development of the field. The purpose of this paper is to reflect on the past decade...

  1. The VIRGO project

    International Nuclear Information System (INIS)

    Yvert, M.

    1991-01-01

    The detection of gravitational waves is, nowadays, technologically possible. The Virgo project, proposed by a French-Italian collaboration, is now on the verge of being fully approved and funded. The goal of the Virgo project is, first, to detect gravitational waves. The next will be to perform, in conjunction with other similar detectors, more precise measurements (i.e. the spin of the graviton) and start gravitational wave astrophysical observations. The method is proposed to use a large Michelson interferometer as a detector. The main motivations, characteristics and expected sensitivity of this project are described. (R.P.) 14 refs., 6 figs

  2. Antiviral Drug Research Proposal Activity

    Directory of Open Access Journals (Sweden)

    Lisa Injaian

    2011-03-01

    Full Text Available The development of antiviral drugs provides an excellent example of how basic and clinical research must be used together in order to achieve the final goal of treating disease. A Research Oriented Learning Activity was designed to help students to better understand how basic and clinical research can be combined toward a common goal. Through this project students gained a better understanding of the process of scientific research and increased their information literacy in the field of virology. The students worked as teams to research the many aspects involved in the antiviral drug design process, with each student becoming an "expert" in one aspect of the project. The Antiviral Drug Research Proposal (ADRP culminated with students presenting their proposals to their peers and local virologists in a poster session. Assessment data showed increased student awareness and knowledge of the research process and the steps involved in the development of antiviral drugs as a result of this activity.

  3. A proposed programme for energy risk research

    International Nuclear Information System (INIS)

    1979-01-01

    The report consists of two parts. Part I presents an overview of technological risk management, noting major contributions and current research needs. Part II details a proposed program of energy research, including discussions of some seven recommended projects. The proposed energy risk research program addresses two basic problem areas: improving the management of energy risks and energy risk communication and public response. Specific recommended projects are given for each. (Auth.)

  4. Project Management with IT Security Focus

    OpenAIRE

    Felician Alecu; Paul Pocatilu; Sergiu Capisizu

    2011-01-01

    The paper focus on the main key points related to the IT security project management. The most important lifecycle stages are identified: IT security project proposal definition, project organization, project planning, quality planning, project team organization, IT security project activities management and project closing. The most important success factors for IT security projects are the support of top-management, customer satisfaction, prevention over remediation and continuous progress....

  5. 15 CFR 917.22 - National Projects funding.

    Science.gov (United States)

    2010-01-01

    ... Projects funding proposals will be expected to address: (1) The relevance of the proposed project to a... projects. Innovation and uniqueness will be significant factors in determining whether to fund a proposed... National Projects can be up to 100 percent of the total cost of the project involved. ...

  6. Evaluation of microfinance projects.

    Science.gov (United States)

    Johnson, S

    1999-08-01

    This paper criticizes the quick system proposed by Henk Moll for evaluating microfinance projects in the article ¿How to Pre-Evaluate Credit Projects in Ten Minutes¿. The author contended that there is a need to emphasize the objectives of the project. The procedure used by Moll, he contended, is applicable only to projects that have only two key objectives, such as credit operations, and the provision of services. Arguments are presented on the three specific questions proposed by Moll, ranging from the availability of externally audited financial reports, the performance of interest rate on loans vis-a-vis the inflation rate, and the provision of loans according to the individual requirements of the borrowers. Lastly, the author emphasizes that the overall approach is not useful and suggests that careful considerations should be observed in the use or abuse of a simple scoring system or checklist such as the one proposed by Moll.

  7. Environmental Assessment for Central Power and Light Company`s proposed Military Highway-CFE tie 138/69-kV transmission line project Brownsville, Cameron County, Texas

    Energy Technology Data Exchange (ETDEWEB)

    1992-04-01

    Central Power and Light Company (CPL) intends to upgrade its existing transmission line ties with the Commision Federal de Electricidad (CFE) system in Mexico. CPL currently has a single 69-kilovolt (kV) transmission line in the Brownsville area which connects CPL`s system with the system of CFE. This existing line runs between the Brownsville Switching Station, located on Laredo Road in Brownsville, Cameron County, Texas, and an existing CFE 69-kV line at the Rusteberg Bend of the Rio Grande in Cameron County. Under current conditions of need, the existing 69-kV line does not possess sufficient capability to engage in appropriate power exchanges. Therefore, CPL is proposing to build a new line to link up with CFE. This proposed line would be a double-circuit line, which would (1) continue (on a slightly relocated route) the existing 69-kV tie from CPL`s Brownsville Switching Station to CFE`s facilities, and (2) add a 138-kV tie from the Military Highway Substation, located on Military Highway (US Highway 281), to CFE`s facilities. The proposed 138/69-kV line, which will be constructed and operated by CPL, will be built primarily on steel single-pole structures within an average 60-foot (ft) wide right-of-way (ROW). It will be approximately 6900--9200 ft (1.3--1.7 miles) in length, depending on the alternative route constructed.

  8. Strategy as Projects

    DEFF Research Database (Denmark)

    Lund Pedersen, Carsten; Ritter, Thomas; Andersen, Torben Juul

    This paper proposes the adoption of a project-based view to analyze strategy formation and strategic renewal over time. Projects are resource-committing, empirically-tracable investments, and as such, particularly suitable for the analysis of different manifestations of intended strategies as well...... as post-hoc manifestations of deviant, even rebellious, actions taken in opposition to the initial strategy announcement. The paper presents an analytical framework (a 5x2 matrix) of ten different project categories that together allows researchers to investigate how strategic renewal is realized through...... the enactment of different types of project initiatives throughout the organization. The developed framework is validated by two field studies that outline the robustness of the proposed matrix. In addition to the demonstration of the advantages of the framework, we discuss the limitations of the strategy-as-projects...

  9. Taxation of Controlled Foreign Companies in Context of the OECD/G20 Project on Base Erosion and Profit Shifting as well as the EU Proposal for the Anti-Tax Avoidance Directive

    DEFF Research Database (Denmark)

    Schmidt, Peter Koerver

    2016-01-01

    Recently, the controlled foreign company (CFC) rules have gained increased attention; as such, rules play an important role in the ongoing efforts of the OECD/G20 and the European Commission with respect to addressing base erosion and profit shifting (BEPS). In this context, the article revisits...... the CFC regimes of the Nordic countries in order to assess whether these regimes are in line with the recommendations from the OECD/G20 and to determine whether Sweden, Finland, and Denmark, as EU member states, will have to make amendments if the commission’s proposal for an Anti-Tax Avoidance Directive...

  10. SISCAL project

    Science.gov (United States)

    Santer, Richard P.; Fell, Frank

    2003-05-01

    The first "ocean colour" sensor, Coastal Zone Color Scanner (CZCS), was launched in 1978. Oceanographers learnt a lot from CZCS but it remained a purely scientific sensor. In recent years, a new generation of satellite-borne earth observation (EO) instruments has been brought into space. These instruments combine high spectral and spatial resolution with revisiting rates of the order of one per day. More instruments with further increased spatial, spectral and temporal resolution will be available within the next years. In the meantime, evaluation procedures taking advantage of the capabilities of the new instruments were derived, allowing the retrieval of ecologically important parameters with higher accuracy than before. Space agencies are now able to collect and to process satellite data in real time and to disseminate them via the Internet. It is therefore meanwhile possible to envisage using EO operationally. In principle, a significant demand for EO data products on terrestrial or marine ecosystems exists both with public authorities (environmental protection, emergency management, natural resources management, national parks, regional planning, etc) and private companies (tourist industry, insurance companies, water suppliers, etc). However, for a number of reasons, many data products that can be derived from the new instruments and methods have not yet left the scientific community towards public or private end users. It is the intention of the proposed SISCAL (Satellite-based Information System on Coastal Areas and Lakes) project to contribute to the closure of the existing gap between space agencies and research institutions on one side and end users on the other side. To do so, we intend to create a data processor that automatically derives and subsequently delivers over the Internet, in Near-Real-Time (NRT), a number of data products tailored to individual end user needs. The data products will be generated using a Geographical Information System (GIS

  11. Proposal of a mathematic program model for production development projects in E and P considering uncertainties; Proposta de um modelo de programacao matematica para projetos de desenvolvimento da producao em E e P considerando incertezas

    Energy Technology Data Exchange (ETDEWEB)

    Kahn, Marcio [Petroleo Brasileiro S.A. (PETROBRAS), Rio de Janeiro, RJ (Brazil); Hamacher, Silvio [Pontificia Universidade Catolica do Rio de Janeiro (PUC-Rio), RJ (Brazil)

    2012-07-01

    A mathematical programming model to support the decision maker how to identify the optimal infrastructure design solution to the Development and Production of an oil field is proposed in this paper. The problem addressed is to maximize the economic return of the additional production of oil in a field with existing production infrastructure installed and as a proposed solution to this problem a model of mixed integer linear programming was developed. This formulation allows identifying the optimal level of exploration and production of a field subject to uncertainties. The variables to be defined are: Floating Production Units installed to be utilized and their oil production, the use of manifolds or not, and the number of wells that will be connected to the Floating Production Units. Finally, the model provides the optimal development plan with the best economic return considering the constraints and uncertainties of the problem. Besides the optimal solution, sensitivity analyzes were performed improving the understanding of the problem and providing useful information to the decision maker. (author)

  12. Taxation of Controlled Foreign Companies in Context of the OECD/G20 Project on Base Erosion and Profit Shifting as well as the EU Proposal for the Anti-Tax Avoidance Directive – An Interim Nordic Assessment

    Directory of Open Access Journals (Sweden)

    Schmidt Peter Koerver

    2016-11-01

    Full Text Available Recently, the controlled foreign company (CFC rules have gained increased attention; as such, rules play an important role in the ongoing efforts of the OECD/G20 and the European Commission with respect to addressing base erosion and profit shifting (BEPS. In this context, the article revisits the CFC regimes of the Nordic countries in order to assess whether these regimes are in line with the recommendations from the OECD/G20 and to determine whether Sweden, Finland, and Denmark, as EU member states, will have to make amendments if the commission’s proposal for an Anti-Tax Avoidance Directive is adopted in its current form. It is concluded that the Nordic CFC regimes in many ways already are in line with the recommendations as well as the directive, but also that certain amendments have to be made.

  13. Memorandum concerning further information on the constructional feasibility of proposed locations for stage 2 of the deep geological repositories project; Nachforderung zum Indikator „Tiefenlage im Hinblick auf bautechnische Machbarkeit“ in Etappe 2 SGT

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2015-11-15

    This memorandum published by the Swiss Federal Nuclear Safety Inspectorate ENSI examines proposals made by the Swiss National Cooperative for the disposal of Radioactive Waste (NAGRA). Further information concerning the technical feasibility of deep repositories for nuclear wastes and their maximum depth is requested. ENSI requests from NAGRA that the minimum geotechnical requirements on the repositories and an assessment on their maximum depth be stated. Five main areas where more information is required are listed. Provisional assessment results on maximum repository depth are quoted and the associated requirements on supplementary data required are listed. Data on basic rock mechanics are requested and requirements on the evaluation of maximum repository depth are discussed. The document is completed with a comprehensive list of relevant references.

  14. Surveys on the distribution and abundance of the Hawaiian hoary bat (Lasiurus cinereus semotus) in the vicinity of proposed geothermal project subzones in the District of Puna, Hawaii. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Reynolds, M.; Ritchotte, G.; Dwyer, J.; Viggiano, A.; Nielsen, B.; Jacobi, J.D. [Fish and Wildlife Service, Hawaii National Park, HI (United States). Hawaii Research Station

    1994-08-01

    In 1993 the US Fish and Wildlife Service (USFWS) entered into an interagency agreement with the Department of Energy (DOE) to conduct wildlife surveys relative to identifying potential impacts of geothermal resource development on the native biota of the east rift zone of Kilauea volcano in the Puna district on the island of Hawaii. This report presents data on the endangered Hawaiian hoary bat (Hawaiian bat), or opeapea (Lasiurus cinereus semotus), within the proposed Hawaii geothermal subzones. Potential effects of geothermal development on Hawaiian bat populations are also discussed. Surveys were conducted to determine the distribution and abundance of bats throughout the District of Puna. Baseline information was collected to evaluate the status of bats within the study area and to identify important foraging habitats. Little specific data exists in the published literature on the population status and potential limiting factors affecting the Hawaiian bat. A USFWS recovery plan does not exist for this endangered species.

  15. A Framework for Project Governance in Major Public IT projects

    DEFF Research Database (Denmark)

    Harboe, Peter Georg; Riis, Eva

    2016-01-01

    such a framework. It was developed from the literature on major and mega-projects, both public and private, that concern infrastructure, engineering and IT. The proposed framework for project governance comprises six major elements: governance structure, management approach, stakeholders, value, systems......The rising number of major public IT projects is mirrored by a growing research interest in the management of such projects. Both can benefit from a more complete understanding of project governance that should lead to a practical framework for project governance. The present paper proposes...... integration and complexity. Empirical research has identified a number of characteristics for these project governance elements. In the second part of the paper the framework was tested in a case study of the Danish smart card Rejsekort project. The framework was found to be robust, and that in this case...

  16. A Framework for Project Governance in Major Public IT projects

    DEFF Research Database (Denmark)

    Riis, Eva; Harboe, Peter Georg

    2016-01-01

    integration and complexity. Empirical research has identified a number of characteristics for these project governance elements. In the second part of the paper the framework was tested in a case study of the Danish smart card Rejsekort project. The framework was found to be robust, and that in this case......The rising number of major public IT projects is mirrored by a growing research interest in the management of such projects. Both can benefit from a more complete understanding of project governance that should lead to a practical framework for project governance. The present paper proposes...... such a framework. It was developed from the literature on major and mega-projects, both public and private, that concern infrastructure, engineering and IT. The proposed framework for project governance comprises six major elements: governance structure, management approach, stakeholders, value, systems...

  17. 78 FR 26063 - Central Utah Project Completion Act; East Hobble Creek Restoration Project Final Environmental...

    Science.gov (United States)

    2013-05-03

    ...-100-00-0-0, CUPCA00] Central Utah Project Completion Act; East Hobble Creek Restoration Project Final... Creek Restoration Project. These two agencies have determined that the proposed [[Page 26064

  18. Project Management

    DEFF Research Database (Denmark)

    Project Management Theory Meets Practice contains the proceedings from the 1st Danish Project Management Research Conference (DAPMARC 2015), held in Copenhagen, Denmark, on May 21st, 2015.......Project Management Theory Meets Practice contains the proceedings from the 1st Danish Project Management Research Conference (DAPMARC 2015), held in Copenhagen, Denmark, on May 21st, 2015....

  19. Medical Oversight, Educational Core Content, and Proposed Scopes of Practice of Wilderness EMS Providers: A Joint Project Developed by Wilderness EMS Educators, Medical Directors, and Regulators Using a Delphi Approach.

    Science.gov (United States)

    Millin, Michael G; Johnson, David E; Schimelpfenig, Tod; Conover, Keith; Sholl, Matthew; Busko, Jonnathan; Alter, Rachael; Smith, Will; Symonds, Jennifer; Taillac, Peter; Hawkins, Seth C

    2017-01-01

    A disparity exists between the skills needed to manage patients in wilderness EMS environments and the scopes of practice that are traditionally approved by state EMS regulators. In response, the National Association of EMS Physicians Wilderness EMS Committee led a project to define the educational core content supporting scopes of practice of wilderness EMS providers and the conditions when wilderness EMS providers should be required to have medical oversight. Using a Delphi process, a group of experts in wilderness EMS, representing educators, medical directors, and regulators, developed model educational core content. This core content is a foundation for wilderness EMS provider scopes of practice and builds on both the National EMS Education Standards and the National EMS Scope of Practice Model. These experts also identified the conditions when oversight is needed for wilderness EMS providers. By consensus, this group of experts identified the educational core content for four unique levels of wilderness EMS providers: Wilderness Emergency Medical Responder (WEMR), Wilderness Emergency Medical Technician (WEMT), Wilderness Advanced Emergency Medical Technician (WAEMT), and Wilderness Paramedic (WParamedic). These levels include specialized skills and techniques pertinent to the operational environment. The skills and techniques increase in complexity with more advanced certification levels, and address the unique circumstances of providing care to patients in the wilderness environment. Furthermore, this group identified that providers having a defined duty to act should be functioning with medical oversight. This group of experts defined the educational core content supporting the specific scopes of practice that each certification level of wilderness EMS provider should have when providing patient care in the wilderness setting. Wilderness EMS providers are, indeed, providing health care and should thus function within defined scopes of practice and with

  20. Project Management

    DEFF Research Database (Denmark)

    Pilkington, Alan; Chai, Kah-Hin; Le, Yang

    2015-01-01

    This paper identifies the true coverage of PM theory through a bibliometric analysis of the International Journal of Project Management from 1996-2012. We identify six persistent research themes: project time management, project risk management, programme management, large-scale project management......, project success/failure and practitioner development. These differ from those presented in review and editorial articles in the literature. In addition, topics missing from the PM BOK: knowledge management project-based organization and project portfolio management have become more popular topics...

  1. Project financing

    International Nuclear Information System (INIS)

    Cowan, A.

    1998-01-01

    Project financing was defined ('where a lender to a specific project has recourse only to the cash flow and assets of that project for repayment and security respectively') and its attributes were described. Project financing was said to be particularly well suited to power, pipeline, mining, telecommunications, petro-chemicals, road construction, and oil and gas projects, i.e. large infrastructure projects that are difficult to fund on-balance sheet, where the risk profile of a project does not fit the corporation's risk appetite, or where higher leverage is required. Sources of project financing were identified. The need to analyze and mitigate risks, and being aware that lenders always take a conservative view and gravitate towards the lowest common denominator, were considered the key to success in obtaining project financing funds. TransAlta Corporation's project financing experiences were used to illustrate the potential of this source of financing

  2. Project descriptions

    International Nuclear Information System (INIS)

    Anon.

    1990-01-01

    This part specifies the activities and project tasks of each project broken down according to types of financing, listing the current projects Lw 1 through 3 funded by long-term provisions (budget), the current projects LB 1 and 2, LG 1 through 5, LK1, LM1, and LU 1 through 6 financed from special funds, and the planned projects ZG 1 through 4 and ZU 1, also financed from special funds. (DG) [de

  3. WIPP site and vicinity geological field trip. A report of a field trip to the proposed Waste Isolation Pilot Plant project in Southeastern New Mexico, June 16 to 18, 1980

    Energy Technology Data Exchange (ETDEWEB)

    Chaturvedi, L

    1980-10-01

    The Environmental Evaluation Group is conducting an assessment of the radiological health risks to people from the Waste Isolation Pilot Plant. As a part of this work, EEG is making an effort to improve the understanding of those geological issues concerning the WIPP site which may affect the radiological consequences of the proposed repository. One of the important geological issues to be resolved is the timing and the nature of the dissolution processes which may have affected the WIPP site. EEG organized a two-day conference of geological scientists, on January 17-18, 1980. On the basis of the January conference and the June field trip, EEG has formed the following conclusions: (1) it has not been clearly established that the site or the surrounding area has been attacked by deep dissolution to render it unsuitable for the nuclear waste pilot repository; (2) the existence of an isolated breccia pipe at the site unaccompanied by a deep dissolution wedge, is a very remote possibility; (3) more specific information about the origin and the nature of the brine reservoirs is needed. An important question that should be resolved is whether each encounter with artesian brine represents a separate pocket or whether these occurrences are interconnected; (4) Anderson has postulated a major tectonic fault or a fracture system at the Basin margin along the San Simon Swale; (5) the area in the northern part of the WIPP site, identified from geophysical and bore hole data as the disturbed zone, should be further investigated to cleary understand the nature and significance of this structural anomaly; and (6) a major drawback encountered during the discussions of geological issues related to the WIPP site is the absence of published material that brings together all the known information related to a particular issue.

  4. Identifying High Performance ERP Projects

    OpenAIRE

    Stensrud, Erik; Myrtveit, Ingunn

    2002-01-01

    Learning from high performance projects is crucial for software process improvement. Therefore, we need to identify outstanding projects that may serve as role models. It is common to measure productivity as an indicator of performance. It is vital that productivity measurements deal correctly with variable returns to scale and multivariate data. Software projects generally exhibit variable returns to scale, and the output from ERP projects is multivariate. We propose to use Data Envelopment ...

  5. UH Telemedicine Proposal

    National Research Council Canada - National Science Library

    Friedman, Richard

    2001-01-01

    The purpose of the University of Hawaii Telemedicine Project (UHTP) is to assess and establish an effective telemedicine curriculum uniquely tailored for the training of military healthcare personnel...

  6. Project studies

    DEFF Research Database (Denmark)

    Geraldi, Joana; Söderlund, Jonas

    2018-01-01

    Project organising is a growing field of scholarly inquiry and management practice. In recent years, two important developments have influenced this field: (1) the study and practice of projects have extended their level of analysis from mainly focussing on individual projects to focussing on micro......, and of the explanations of project practices they could offer. To discuss avenues for future research on projects and project practice, this paper suggests the notion of project studies to better grasp the status of our field. We combine these two sets of ideas to analyse the status and future options for advancing...... project research: (1) levels of analysis; and (2) type of research. Analysing recent developments within project studies, we observe the emergence of what we refer to as type 3 research, which reconciles the need for theoretical development and engagement with practice. Type 3 research suggests pragmatic...

  7. Project Longshot

    Science.gov (United States)

    West, J. Curtis; Chamberlain, Sally A.; Stevens, Robert; Pagan, Neftali

    1989-01-01

    Project Longshot is an unmanned probe to our nearest star system, Alpha Centauri, 4.3 light years away. The Centauri system is a trinary system consisting of two central stars (A and B) orbiting a barycenter, and a third (Proxima Centauri) orbiting the two. The system is a declination of -67 degrees. The goal is to reach the Centauri system in 50 years. This time space was chosen because any shorter time would be impossible of the relativistic velocities involved, and any greater time would be impossible because of the difficulty of creating a spacecraft with such a long lifetime. Therefore, the following mission profile is proposed: (1) spacecraft is assembled in Earth orbit; (2) spacecraft escapes Earth and Sun in the ecliptic with a single impulse maneuver; (3) spacecraft changed declination to point toward Centauri system; (4) spacecraft accelerates to 0.1c; (5) spacecraft coasts at 0.1c for 41 years; (6) spacecraft decelerates upon reaching Centauri system; and (7) spacecraft orbits Centauri system, conducts investigations, and relays data to Earth. The total time to reach the Centauri system, taking into consideration acceleration and deceleration, will be approximately 50 years.

  8. How to write a research proposal?

    Directory of Open Access Journals (Sweden)

    K Sudheesh

    2016-01-01

    Full Text Available Writing the proposal of a research work in the present era is a challenging task due to the constantly evolving trends in the qualitative research design and the need to incorporate medical advances into the methodology. The proposal is a detailed plan or ′blueprint′ for the intended study, and once it is completed, the research project should flow smoothly. Even today, many of the proposals at post-graduate evaluation committees and application proposals for funding are substandard. A search was conducted with keywords such as research proposal, writing proposal and qualitative using search engines, namely, PubMed and Google Scholar, and an attempt has been made to provide broad guidelines for writing a scientifically appropriate research proposal.

  9. How to write a research proposal?

    Science.gov (United States)

    Sudheesh, K; Duggappa, Devika Rani; Nethra, S S

    2016-09-01

    Writing the proposal of a research work in the present era is a challenging task due to the constantly evolving trends in the qualitative research design and the need to incorporate medical advances into the methodology. The proposal is a detailed plan or 'blueprint' for the intended study, and once it is completed, the research project should flow smoothly. Even today, many of the proposals at post-graduate evaluation committees and application proposals for funding are substandard. A search was conducted with keywords such as research proposal, writing proposal and qualitative using search engines, namely, PubMed and Google Scholar, and an attempt has been made to provide broad guidelines for writing a scientifically appropriate research proposal.

  10. Status of APE projects

    CERN Document Server

    Alfieri, R; Onofri, E; Bartoloni, A; Battista, C; Cabibbo, Nicola; Cosimi, M; Lonardo, A; Michelotti, A; Proietti, B; Rapuano, F; Rossetti, D; Sacco, G; Tassa, S; Torelli, M; Vicini, P; Pène, O; Errico, W; Magazzù, G; Sartori, L; Schiiano, F; Tripiccione, R; De Riso, P; Petronzio, Roberto; Destri, C; Frezzotti, R; Marchesini, G; Gensch, Ulrich; Jansen, K; Kretzschmann, A; Leich, H; Paschedag, N; Pleiter, D; Schwendicke, U; Simma, H; Sommer, Rainer; Sulanke, K; Wegner, P; Fucci, A; Martin, B; Pech, J; Panizzi, E; Petricola, A

    2001-01-01

    This talk is divided in two parts. In the first part, we will summarize the status of the APEmille project that will be completed by the end of the year. We will then devote the rest of the talk to the description of a new project for a multi-TeraFlop machine, ape NEXT. The interested reader will find a much more detailed discussion of all the items touched upon here in the full proposal of the project that will shortly appear on hep-lat. (9 refs).

  11. Adaptive projective filters

    International Nuclear Information System (INIS)

    Dikusar, N.D.

    1993-01-01

    The new approach to solving of the finding problem is proposed. The method is based on Discrete Projective Transformations (DPT), the List Square Fitting (LSF) and uses the information feedback in tracing for linear or quadratic track segments (TS). The fast and stable with respect to measurement errors and background points recurrent algorithm is suggested. The algorithm realizes the family of digital adaptive projective filters (APF) with known nonlinear weight functions-projective invariants. APF can be used in adequate control systems for collection, processing and compression of data, including tracking problems for the wide class of detectors. 10 refs.; 9 figs

  12. Virtual projects

    DEFF Research Database (Denmark)

    Svejvig, Per; Commisso, Trine Hald

    2012-01-01

    that the best practice knowledge has not permeated sufficiently to the practice. Furthermore, the appropriate application of information and communication technology (ICT) remains a big challenge, and finally project managers are not sufficiently trained in organizing and conducting virtual projects....... The overall implications for research and practice are to acknowledge virtual project management as very different to traditional project management and to address this difference.......Virtual projects are common with global competition, market development, and not least the financial crisis forcing organizations to reduce their costs drastically. Organizations therefore have to place high importance on ways to carry out virtual projects and consider appropriate practices...

  13. Project financing

    International Nuclear Information System (INIS)

    Alvarez, M.U.

    1990-01-01

    This paper presents the basic concepts and components of the project financing of large industrial facilities. Diagrams of a simple partnership structure and a simple leveraged lease structure are included. Finally, a Hypothetical Project is described with basic issues identified for discussion purposes. The topics of the paper include non-recourse financing, principal advantages and objectives, disadvantages, project financing participants and agreements, feasibility studies, organization of the project company, principal agreements in a project financing, insurance, and an examination of a hypothetical project

  14. MATCHING CONFIGURATIONS PROJECTS OF COOPERATIVE MILK COLLECTION PROJECT ENVIRONMENT

    Directory of Open Access Journals (Sweden)

    Анатолій Миколайович ТРИГУБА

    2017-03-01

    Full Text Available The condition analysis of dairy farming is done and the reasons for its degradation are revealed. The need of technologically integrated production systems projects, harvesting, and processing of milk are substantiated. A scientific methodology and the method of project design of milk provision cooperative coordination in the community of the project environment, which are based on systematic-evaluative approach and simulation are proposed. The criterion for the definition of rational parameters of objects configuration for milk provision cooperative projects in the community system is the maximum value of their product. The monetary functioning assessment of the configuration object of cooperative milk provision projects in the community is done. On the basis of the proposed method, we performed the coordination of project configuration of milk provision cooperative with the project environment of territory Zabolotsi community in Brody district of Lviv region.

  15. 76 FR 67400 - Capital Project Management

    Science.gov (United States)

    2011-11-01

    ...-0030] RIN 2132-AA92 Capital Project Management AGENCY: Federal Transit Administration (FTA), DOT... extending the comment period on its proposed rule for Capital Project Management to December 2, 2011, to...) proposing to transform the current FTA rule for project management oversight into a discrete set of...

  16. 7 CFR 1777.13 - Project priority.

    Science.gov (United States)

    2010-01-01

    ... joint financing committed to the proposed project is: (i) Twenty percent or more private, local, or.... (See definition in § 1777.4). The proposed project will provide water and/or waste disposal services to... 7 Agriculture 12 2010-01-01 2010-01-01 false Project priority. 1777.13 Section 1777.13 Agriculture...

  17. Microsoft project

    OpenAIRE

    Markić, Lucija; Mandušić, Dubravka; Grbavac, Vitomir

    2005-01-01

    Microsoft Project je alat čije su prednosti u svakodnevnom radu nezamjenjive. Pomoću Microsoft Projecta omogućeno je upravljanje resursima, stvaranje izvještaja o projektima u vremenu, te analize različitih scenarija. Pojavljuje u tri verzije: Microsoft Project Professional, Microsoft Project Server i Microsoft Project Server Client Access Licenses. Upravo je trend da suvremeni poslovni ljudi zadatke povjeravaju Microsoft Projectu jer on znatno povećava produktivnost rada. Te prednos...

  18. Project ethics

    CERN Document Server

    Jonasson, Haukur Ingi

    2013-01-01

    How relevant is ethics to project management? The book - which aims to demystify the field of ethics for project managers and managers in general - takes both a critical and a practical look at project management in terms of success criteria, and ethical opportunities and risks. The goal is to help the reader to use ethical theory to further identify opportunities and risks within their projects and thereby to advance more directly along the path of mature and sustainable managerial practice.

  19. The qualitative research proposal

    Directory of Open Access Journals (Sweden)

    H Klopper

    2008-09-01

    Full Text Available Qualitative research in the health sciences has had to overcome many prejudices and a number of misunderstandings, but today qualitative research is as acceptable as quantitative research designs and is widely funded and published. Writing the proposal of a qualitative study, however, can be a challenging feat, due to the emergent nature of the qualitative research design and the description of the methodology as a process. Even today, many sub-standard proposals at post-graduate evaluation committees and application proposals to be considered for funding are still seen. This problem has led the researcher to develop a framework to guide the qualitative researcher in writing the proposal of a qualitative study based on the following research questions: (i What is the process of writing a qualitative research proposal? and (ii What does the structure and layout of a qualitative proposal look like? The purpose of this article is to discuss the process of writing the qualitative research proposal, as well as describe the structure and layout of a qualitative research proposal. The process of writing a qualitative research proposal is discussed with regards to the most important questions that need to be answered in your research proposal with consideration of the guidelines of being practical, being persuasive, making broader links, aiming for crystal clarity and planning before you write. While the structure of the qualitative research proposal is discussed with regards to the key sections of the proposal, namely the cover page, abstract, introduction, review of the literature, research problem and research questions, research purpose and objectives, research paradigm, research design, research method, ethical considerations, dissemination plan, budget and appendices.

  20. 78 FR 42027 - Proposed Amendment To Advance Notice of Proposed Rulemaking for Pension Benefit Statements

    Science.gov (United States)

    2013-07-15

    ... Proposed Amendment To Advance Notice of Proposed Rulemaking for Pension Benefit Statements AGENCY: Employee... illustrations given to participants in defined contribution pension plans, such as 401(k) and 403(b) plans. The... Labor, 200 Constitution Avenue NW., Washington, DC 20210, Attention: Pension Benefit Statements Project...

  1. Beyond theory : Towards a probabilistic causation model to support project governance in infrastructure projects

    NARCIS (Netherlands)

    Chivatá Cárdenas, Ibsen; Voordijk, Johannes T.; Dewulf, Geert

    2017-01-01

    A new project governance model for infrastructure projects is described in this paper. This model contains causal mechanisms that relate a number of project governance variables to project performance. Our proposed model includes relevant variables for measuring project governance in construction

  2. Fiscal 2000 survey report. High-efficiency energy system introduction promotion project for houses and structures - Houses (Technical classification tables prepared by analysis of proposed systems, and comments on the same); 2000 nendo jutaku kenchikubutsu kokoritsu energy system donyu sokushin jigyo (jutaku ni kakawaru mono) teian system no bunseki ni yoru gijutsu bunruihyo oyobi dokaisetsu

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    As an energy conservation promotion measure, a project is under development for introducing and subsidizing high-efficiency energy systems and for letting their effect known publicly and widely. The number of proposed energy systems has increased greatly and technical divisions to follow in classifying them have become vague, from which problems are now arising over the execution of follow-up checks and the maintenance of fair treatment. In the effort to solve this problem, 376 propositions are analyzed and classified, a technical classification method is proposed, and an instruction manual on the method is compiled. The classification involves (1) proposed classification, (2) variation, (3) energy reduction rate, and (4) tentatively calculated cost. Item (1) deals with the basic classification (air-conditioning, ventilation, and hot water supply, and, to be considered in combination with them, options which are cooking, illumination, and others) and, item (2) covers eight items such as new/old construction, structure, and structural frame. In Chapter 1 of the report, the 376 propositions are put in order according to common classification items and an original classification table is prepared. In Chapter 2, the goals are clarified and the classification principles are defined. In Chapter 3, the classification is checked for its validity and some realistic ways of grouping are described. In Chapter 4, a classification implementation flow chart is shown. (NEDO)

  3. Transport Project Evaluation

    DEFF Research Database (Denmark)

    Leleur, Steen

    1996-01-01

    Two main project evaluation approaches exist: cost-benefit analysis (CBA) and multi-criteria analysis (MCA). Related to a European road evaluation method (EURET 1.1) and the MCA-method, WARP, the paper proposes a set of so-called segregated investment return rates (SIRR) to integrate advantages...

  4. ACCESS Project: Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Weller, Heiko [Robert Bosch, LLC, Farmington Hills, MI (United States)

    2015-04-01

    The ACCESS project addressed the development, testing, and demonstration of the proposed advanced technologies and the associated emission and fuel economy improvement at an engine dynamometer and on a full-scale vehicle. Improve fuel economy by 25% with minimum performance penalties Achieve SULEV level emissions with gasoline Demonstrate multi-mode combustion engine management system

  5. 23 CFR 635.112 - Advertising for bids and proposals.

    Science.gov (United States)

    2010-04-01

    ... OPERATIONS CONSTRUCTION AND MAINTENANCE Contract Procedures § 635.112 Advertising for bids and proposals. (a) No work shall be undertaken on any Federal-aid project, nor shall any project be advertised for bids... 23 Highways 1 2010-04-01 2010-04-01 false Advertising for bids and proposals. 635.112 Section 635...

  6. 76 FR 1619 - Proposed Information Collection Activity; Comment Request

    Science.gov (United States)

    2011-01-11

    ... SACWIS Assessment Reviews, at any time in the system life cycle. Submission of the SACWIS SARG and other...-0159] Proposed Information Collection Activity; Comment Request Proposed Projects Title: Statewide... the project, as described in the approved Advance Planning Document, have been adequately completed...

  7. Project management of life-science research projects: project characteristics, challenges and training needs.

    Science.gov (United States)

    Beukers, Margot W

    2011-02-01

    Thirty-four project managers of life-science research projects were interviewed to investigate the characteristics of their projects, the challenges they faced and their training requirements. A set of ten discriminating parameters were identified based on four project categories: contract research, development, discovery and call-based projects--projects set up to address research questions defined in a call for proposals. The major challenges these project managers are faced with relate to project members, leadership without authority and a lack of commitment from the respective organization. Two-thirds of the project managers indicated that they would be interested in receiving additional training, mostly on people-oriented, soft skills. The training programs that are currently on offer, however, do not meet their needs. Copyright © 2010 Elsevier Ltd. All rights reserved.

  8. Sustainability assessment: a tool for planning for sustainability as a desired outcome for a proposed development

    CSIR Research Space (South Africa)

    Haywood, L

    2009-08-01

    Full Text Available This paper presents a theoretical framework for planning for sustainability for any proposed development project. The objective of this framework is to foster and preserve the social ecological system in which the proposed development project...

  9. Project Temporalities

    DEFF Research Database (Denmark)

    Tryggestad, Kjell; Justesen, Lise; Mouritsen, Jan

    2013-01-01

    Purpose – The purpose of this paper is to explore how animals can become stakeholders in interaction with project management technologies and what happens with project temporalities when new and surprising stakeholders become part of a project and a recognized matter of concern to be taken...... into account. Design/methodology/approach – The paper is based on a qualitative case study of a project in the building industry. The authors use actor-network theory (ANT) to analyze the emergence of animal stakeholders, stakes and temporalities. Findings – The study shows how project temporalities can...... multiply in interaction with project management technologies and how conventional linear conceptions of project time may be contested with the emergence of new non-human stakeholders and temporalities. Research limitations/implications – The study draws on ANT to show how animals can become stakeholders...

  10. Periodontics II: Course Proposal.

    Science.gov (United States)

    Dordick, Bruce

    A proposal is presented for Periodontics II, a course offered at the Community College of Philadelphia to give the dental hygiene/assisting student an understanding of the disease states of the periodontium and their treatment. A standardized course proposal cover form is given, followed by a statement of purpose for the course, a list of major…

  11. New Accelerator Projects

    International Nuclear Information System (INIS)

    Delahaye, J.P.

    2010-01-01

    There is large number of ambitious accelerator projects with promising performances in the near (and short term) future which aims at exploring energy and/or luminosity frontiers and Complementary aspects of various particles species. High Energy Physics requirements are extremely demanding with challenging parameters: entering into the new territories of the tera-scale data, high Energy or/and High (Integrated) Luminosity, high performance, high availability, long lifetime, luminosity leveling etc.. New projects are more and more challenging: larger, more powerful, more expensive, technology above present standard. Innovative ideas and breakthrough on novel technologies are key for HEP adventure. Aggressive R and D is imperative on beam and Technology related, on cost and power consumption mitigation.. There is ambitious Test Facilities to address feasibility. More and more time and (M and P) resources are required from first ideas to project proposal: it is of prime importance to launch R and D early, explore all possible options of schemes and technologies (anticipating future Physics requests), make realistic status and schedule estimates (preserve credibility and make reasonable plans). Global Collaboration is mandatory from the R and D phase to the construction and operation in order to make best use of limited resources and available expertise as inspired from successful collaborations on Detectors. The global strategy of new accelerator projects in truly world-wide collaboration aims at: - defining all various Projects and Technology options worth exploring, - taking advantage of global teams made of world-wide experts, and of synergies to address common issues (generic R and D) of various projects, - preparing together plethora of project proposals to cover Physics Landscape (ready for window opportunity), - developing Collaborative/Competition (Experts in Collaboration, Technology and Projects options in Competition), - Joining resources on (few) selected

  12. 76 FR 8359 - Boulder Canyon Project

    Science.gov (United States)

    2011-02-14

    ... DEPARTMENT OF ENERGY Western Area Power Administration Boulder Canyon Project AGENCY: Western Area... Western Area Power Administration (Western) is proposing an adjustment to the Boulder Canyon Project (BCP... Reclamation Project Act of 1939 (43 U.S.C. 485h(c)), and other acts that specifically apply to the project...

  13. 18 CFR 157.37 - Project design.

    Science.gov (United States)

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Project design. 157.37... Seasons for Alaska Natural Gas Transportation Projects § 157.37 Project design. In reviewing any... proposed project has been designed to accommodate the needs of shippers who have made conforming bids...

  14. Marion Industrial Substation project

    International Nuclear Information System (INIS)

    1992-04-01

    Consumers Power, Inc. (CPI), proposes to construct a new distribution substation under the existing Bonneville Power Administration (BPA) Albay-Lebanon transmission line near the city of Albany in Linn County, Oregon. BPA is proposing to grant a new Point of Delivery to CPI at this substation. The purpose of the project is to serve the developing industrial needs in the Marion Industrial Park and on the 550 acres of nearby land within CPI's service area that are zoned for residential use. CPI prepared, and the Rural Electrification Administration (REA) has approved a Borrower's Environmental Report (BER) which addresses this action along with several other proposed projects in the CPI service area. Portions of this BER are summarized in this brief EA. BPA is preparing its own EA since Department of Energy National Environmental Policy Act (NEPA) guidelines require additional environmental concerns to be addressed than are required by REA's NEPA guidelines

  15. ATF2 Proposal v. 2

    CERN Document Server

    Grishanov, B I; Alabau-Pons, M; Angal-Kalinin, Deepa; Appleby, R; Araki, S; Bailey, I; Bambade, P; Bane, Karl Leopold Freitag; Barlow, R; Blair, G A; Bolzon, B; Boorman, G; Bosco, A; Brachmann, A; Braun, Hans Heinrich; Burrows, P N; Carter, J; Choi, J; Christian, Glenn B; Clarke, C; Dabiri-Khah, A; Dadoun, O; Danagulyan, S; Delerue, N; Dixit, S; Driouichi, C; Elsen E; Gao, J; Geffroy, N; Gronberg, J; Hartin, Anthony F; Hayano, H; Higashi, Y; Himel, T; Honda, Y; Howell, D; Huang, J Y; Iwashita, Y; Jenner, L; Jones, J; Jones, R; Jérémie, A; Kalinin, A; Kanazawa, K; Kang, H S; Karyotakis, Yu; Kim, E S; Kim, S; Komamiya, S; Kourevlev, German Yu; Kubo, K; Kumada, M; Kume, T; Kuriki, M; Kuroda, S; Liu, W; Logatchev, P V; Lyapin, A; Malton, S; Markiewicz, T W; Masuzawa, M; Mihara, T; Miller, D J; Molloy, S; Mtingwa, S; Naito, T; Nan-Phinney, Y; Napoly, O; Nelson, J; Okugi, T; Payet, J; Pei, G X; Pivi, M T F; Podgorny, F; Price, M; Raubenheimer, T O; Reichold, A; Ross, M; Sanuki, T; Schulte, Daniel; Seryi, R A; Solyak, N; Soo Ko In; Spencer, C M; Suehara, T; Sugahara, R; Takahashi, T; Takashi-Boogert, S; Tauchi, T; Telnov, Valery I; Tenenbaum, P G; Terunuma, N; Toge, N; Torrence, E; Urakawa, J; Urner, D; Vogel, V; Walker, N; Wang, J Q; Wendt, M; White, G; Wing, M; Wolski, A; Woodley, M; Yamaoka, H; Yokoya, K; Zimmermann, Frank

    2006-01-01

    For achieving the high luminosity required at the International Linear Collider (ILC), it is critical to focus the beams to nanometer size with the ILC Beam Delivery System (BDS), and to maintain the beam collision with a nanometer-scale stability. To establish the technologies associated with this ultra-high precision beam handling, it has been proposed to implement an ILC-like final focus optics in an extension of the existing extraction beamline of ATF at KEK. The ATF is considered to be the best platform for this exercise, since it provides an adequate ultra-low emittance electron beam in a manner dedicated to the development of ILC. The two major goals for this facility, called ATF2, are : (A) Achievement of a 37 nm beam size, and (B) control of beam position down to 2 nm level. The scientific justification for the ATF2 project and its technical design have been described in Volume 1 of the ATF2 Proposal [1]. We present here Volume 2 of the ATF2 Proposal, in which we present specifics of the construction...

  16. Advanced Energy Projects FY 1990 research summaries

    International Nuclear Information System (INIS)

    1990-09-01

    This report serves as a guide to prepare proposals and provides summaries of the research projects active in FY 1990, sponsored by the Office of Basic Energy Sciences Division of Advanced Energy Projects, Department of Energy. (JF)

  17. Environmental Assessment Lakeview Geothermal Project

    Energy Technology Data Exchange (ETDEWEB)

    Treis, Tania [Southern Oregon Economic Development Department, Medford, OR (United States)

    2012-04-30

    The Town of Lakeview is proposing to construct and operate a geothermal direct use district heating system in Lakeview, Oregon. The proposed project would be in Lake County, Oregon, within the Lakeview Known Geothermal Resources Area (KGRA). The proposed project includes the following elements: Drilling, testing, and completion of a new production well and geothermal water injection well; construction and operation of a geothermal production fluid pipeline from the well pad to various Town buildings (i.e., local schools, hospital, and Lake County Industrial Park) and back to a geothermal water injection well. This EA describes the proposed project, the alternatives considered, and presents the environmental analysis pursuant to the National Environmental Policy Act. The project would not result in adverse effects to the environment with the implementation of environmental protection measures.

  18. 77 FR 71039 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2012-11-28

    ... Payees, and Payments of Gross Proceeds From Sales Involving Investment Advisers. DATES: Written comments... on Behalf of Another Person, Payments to Joint Payees, and Payments of Gross Proceeds From Sales... of information on respondents, including through the use of automated collection techniques or other...

  19. 78 FR 79728 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2013-12-31

    ... certain information documenting their sales of prepaid telephone cards to other carriers to avoid... through the use of automated collection techniques or other forms of information technology; and (e...

  20. 78 FR 38808 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2013-06-27

    ... 1995, Public Law 104-13 (44 U.S.C. 3506(c)(2)(A)). Currently, the IRS is soliciting comments concerning employee business expenses reporting and withholding on employee business expense reimbursements and... through the internet, at [email protected] . SUPPLEMENTARY INFORMATION: Title: Employee Business...

  1. 78 FR 48230 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2013-08-07

    ... provide rules regarding the deferral of gain on a partnership's sale of qualified small business stock and deferral of gain on a partner's sale of qualified small business stock distributed by a partnership. The final regulations affect partnerships that invest in qualified small business stock and their partners...

  2. 77 FR 68887 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2012-11-16

    ... an accrual method of accounting and performing services. The final regulations reflect amendments... Nonaccrual-Experience Method of Accounting Under Section 448(d)(5). DATES: Written comments should be....gov . SUPPLEMENTARY INFORMATION: Title: Nonaccrual-Experience Method of Accounting Under Section 448(d...

  3. 76 FR 63993 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2011-10-14

    ... that support must be reported using the organization's overall method of accounting. All tax-exempt... information displays a valid OMB control number. Books or records relating to a collection of information must... functions of the agency, including whether the information shall have practical utility; (b) the accuracy of...

  4. 75 FR 47894 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2010-08-09

    ... accounting for a dual consolidated loss where the dual resident corporation files a consolidated return... information unless the collection of information displays a valid OMB control number. Books or records... for the proper performance of the functions of the agency, including whether the information shall...

  5. 76 FR 30433 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2011-05-25

    ... certain method of accounting, are affected. Current Actions: There is no change to this existing... OMB control number. Books or records relating to a collection of information must be retained as long...) Whether the collection of information is necessary for the proper performance of the functions of the...

  6. 75 FR 33892 - Proposed Collection; Comment Request For Regulation Project

    Science.gov (United States)

    2010-06-15

    ... request the consent of the Commissioner to change their methods of accounting for the capitalization of... number. Books or records relating to a collection of information must be retained as long as their... information is necessary for the proper performance of the functions of the agency, including whether the...

  7. 75 FR 53740 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2010-09-01

    .... This regulation grants the taxpayer consent to change its method of accounting for such transactions by... number. Books or records relating to a collection of information must be retained as long as their... information is necessary for the proper performance of the functions of the agency, including whether the...

  8. 78 FR 40549 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2013-07-05

    ... request the consent of the Commissioner to change their methods of accounting for the capitalization of... number. Books or records relating to a collection of information must be retained as long as their... information is necessary for the proper performance of the functions of the agency, including whether the...

  9. 77 FR 31686 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2012-05-29

    ... losses on a yearly basis by the amount of estimated salvage recoverable if the company [[Page 31687...) Whether the collection of information is necessary for the proper performance of the functions of the...

  10. 75 FR 9024 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2010-02-26

    ... concerning an existing final regulation, LR-213-76 (TD 8095), Estate and Gift Taxes; Qualified Disclaimers of...: Title: Estate and Gift Taxes; Qualified Disclaimers of Property. OMB Number: 1545-0959. Regulation... interest in property received by gift or inheritance. The interest is treated as if the disclaimant never...

  11. 78 FR 22039 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2013-04-12

    ... estate and gift Taxes; qualified disclaimers of property (Section 25.2518-2(b)). DATES: Written comments....gov . SUPPLEMENTARY INFORMATION: Title: Estate and Gift Taxes; Qualified Disclaimers of Property. OMB... allows a person to disclaim an interest in property received by gift or inheritance. The interest is...

  12. 75 FR 5871 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2010-02-04

    ... use e-commerce to make misleading solicitations. Current Actions: There is no change to this existing... information technology; and (e) estimates of capital or start-up costs and costs of operation, maintenance...

  13. ASDEX-UG. ASDEX upgrade project proposal. Phase 2

    International Nuclear Information System (INIS)

    1983-05-01

    The objective of ASDEX UG is to investigate the problems relating to tokamak divertor physics and the boundary layer of hot plasmas which cannot be covered otherwise by either ASDEX or other EUROPEAN tokamaks, including JET, but whose investigation is indispensable for NET and INTOR. The configuration of ASDEX UG is changed as compared with ASDEX due to the requirement that all poloidal field coils are located outside the toroidal field magnet. This leads to a highly elongated D-shaped plasma with an ''open'' divertor, which does not allow to close the divertor chamber by such simple means as in ASDEX. In section 2, the aims of ASDEX UG are repeated briefly and the essential features and parameters of the tokamak system are summarized. The summary includes an overview of the tokamak design, the time schedule of design and construction concluding with the estimated investment cost and manpower required. In section 3 the tokamak system components are treated. The circuits and energy supply for the different electrical components are described in section 4. Auxiliary heating requirements and methods are discussed in section 5. Section 6 presents a survey over the periphery of the tokamak system including preparation of the building and radiation shielding. Section 7 outlines the physical programme. Section 8 is devoted to diagnostics. Finally, the principal concepts for control, data acquisition and handling are outlined in section 9. (orig./AH)

  14. Open Source Hbim for Cultural Heritage: a Project Proposal

    Science.gov (United States)

    Diara, F.; Rinaudo, F.

    2018-05-01

    Actual technologies are changing Cultural Heritage research, analysis, conservation and development ways, allowing new innovative approaches. The possibility of integrating Cultural Heritage data, like archaeological information, inside a three-dimensional environment system (like a Building Information Modelling) involve huge benefits for its management, monitoring and valorisation. Nowadays there are many commercial BIM solutions. However, these tools are thought and developed mostly for architecture design or technical installations. An example of better solution could be a dynamic and open platform that might consider Cultural Heritage needs as priority. Suitable solution for better and complete data usability and accessibility could be guaranteed by open source protocols. This choice would allow adapting software to Cultural Heritage needs and not the opposite, thus avoiding methodological stretches. This work will focus exactly on analysis and experimentations about specific characteristics of these kind of open source software (DBMS, CAD, Servers) applied to a Cultural Heritage example, in order to verifying their flexibility, reliability and then creating a dynamic HBIM open source prototype. Indeed, it might be a starting point for a future creation of a complete HBIM open source solution that we could adapt to others Cultural Heritage researches and analysis.

  15. 78 FR 72152 - Proposed Collection: Comment Request for Regulation Project

    Science.gov (United States)

    2013-12-02

    ... experience available. Current Actions: There is no change to this existing regulation. Type of Review... costs and costs of operation, maintenance, and purchase of services to provide information. Approved...

  16. 75 FR 13207 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2010-03-18

    ... INFORMATION: Title: Definition of a Controlled Foreign Corporation, Foreign Base Company Income and Foreign... comments concerning an existing final regulation, INTL-362-88 (TD 8618), Definition of a Controlled Foreign Corporation, Foreign Base Company Income and Foreign Personal Holding Company Income of a Controlled Foreign...

  17. 76 FR 77052 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2011-12-09

    ... 1995, Public Law 104-13 (44 U.S.C. 3506(c)(2)(A)). The IRS is soliciting comments concerning... requires large banks to change from reserve method of accounting to the specific charge off method of accounting for bad debts. Section 1.585-8 of the regulation contains reporting requirements in cases in which...

  18. 76 FR 16856 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2011-03-25

    ... Reduction Act of 1995, Public Law 104-13 (44 U.S.C. 3506(c)(2)(A)). Currently, the IRS is soliciting comments concerning existing final regulations, REG-208156-91 (TD 8929), Accounting for Long-Term Contracts... the Internet at [email protected] . SUPPLEMENTARY INFORMATION: Title: Accounting for Long-Term...

  19. 78 FR 39830 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2013-07-02

    ... Reduction Act of 1995, Public Law 104-13(44 U.S.C. 3506(c)(2)(A)). Currently, the IRS is soliciting comments... separate transactions method of accounting (DASTM). DATES: Written comments should be received on or before... Dollar Approximate Separate Transactions Method of Accounting (DASTM). OMB Number: 1545-1051. Regulation...

  20. 76 FR 36623 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2011-06-22

    ... 1995, Public Law 104-13 (44 U.S.C. 3506(c)(2)(A)). Currently, the IRS is soliciting comments concerning requirements respecting the adoption or change of accounting method; extensions of time to make elections... or Change of Accounting Method; Extensions of Time to Make Elections. OMB Number: 1545-1488...

  1. 78 FR 39064 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2013-06-28

    ... 1995, Public Law 104-13 (44 U.S.C. 3506(c)(2)(A)). Currently, the IRS is soliciting comments concerning... Internal Revenue Code deal with the filing dates of certain corporate returns. Regulation section 1.6072-2...: Individual or households, business or other for- profit organizations, not-for-profit institutions, farms...

  2. 76 FR 27751 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2011-05-12

    ... 1995, Public Law 104-13(44 U.S.C. 3506(c)(2)(A)). The IRS is soliciting comments concerning information collection related to Limitations on Corporate Net Operating Loss. DATES: Written comments should be received... . SUPPLEMENTARY INFORMATION: Title: Limitations on Corporate Net Operating Loss. OMB Number: 1545-1381. [[Page...

  3. 76 FR 21097 - Proposed Collection; Comment Request For Regulation Project

    Science.gov (United States)

    2011-04-14

    ... Disposition of Interest in Certain Natural Resource Recapture Property by S Corporations and Their Shareholders. DATES: Written comments should be received on or before June 13, 2011 to be assured of...: Treatment of Gain From the Disposition of Interest in Certain Natural Resource Recapture Property by S...

  4. 76 FR 21427 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2011-04-15

    ... related to the treatment of gain from the disposition of interest in certain natural resource recapture property by S corporations and their shareholders. DATES: Written comments should be received on or before... . SUPPLEMENTARY INFORMATION: Title: Treatment of Gain From the Disposition of Interest in Certain Natural Resource...

  5. 76 FR 27749 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2011-05-12

    .... Type of Review: Extension of currently approved collection. Affected Public: Businesses or other for...) estimates of capital or start-up costs and costs of operation, maintenance, and purchase of services to... collection requirements related to Capital Gains, Partnership, Subchapter S, and Trusts Provisions. DATES...

  6. 76 FR 12415 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2011-03-07

    ..., Certain Transfers of Property to Regulated Investment Companies (RICs) and Real Estate Investment Trusts... Property to Regulated Investment Companies (RICs) and Real Estate Investment Trusts (REITs). OMB Number... with respect to the net built-in gain of C corporation property that becomes property of a Regulated...

  7. 77 FR 34459 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2012-06-11

    ... jurisdiction of the Associate Chief Counsel (Corporate), the Associate Chief Counsel (Financial Institutions and Products), the Associate Chief Counsel (Income Tax and Accounting), the Associate Chief Counsel... to provide more guidance to individual corporate taxpayers and their shareholders. Current Actions...

  8. 76 FR 49536 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2011-08-10

    ... Reduction Act of 1995, Public Law 104-13 (44 U.S.C. 3506(c)(2)(A)). Currently, the IRS is soliciting comments concerning application of the grantor trust rules to nonexempt employees' trusts. DATES: Written... [email protected] . SUPPLEMENTARY INFORMATION: Title: Application of the Grantor Trust Rules to...

  9. 76 FR 23645 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2011-04-27

    ... 1995, Public Law 104-13 (44 U.S.C. 3506(c)(2)(A)). The IRS is soliciting comments concerning information collection requirements related to Sale of Residence From Qualified Personal Residence Trust... . SUPPLEMENTARY INFORMATION: Title: Sale of Residence From Qualified Personal Residence Trust. OMB Number: 1545...

  10. 75 FR 36480 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2010-06-25

    ... required by the Paperwork Reduction Act of 1995, Public Law 104-13 (44 U.S.C. 3506(c)(2)(A)). Currently..., Qualified Severance of a Trust for Generation-Skipping Transfer (GST) Tax Purposes. DATES: Written [email protected] . SUPPLEMENTARY INFORMATION: Title: Qualified Severance of a Trust for Generation-Skipping...

  11. 78 FR 43002 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2013-07-18

    ... 1995, Public Law 104-13 (44 U.S.C. 3506(c)(2)(A)). Currently, the IRS is soliciting comments concerning an existing, qualified severance of a trust for generation-skipping transfer (GST) tax purposes... [email protected] . SUPPLEMENTARY INFORMATION: Title: Qualified Severance of a Trust for Generation...

  12. 75 FR 63543 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2010-10-15

    ... Reduction Act of 1995, Public Law 104-13 (44 U.S.C. 3506(c)(2)(A)). Currently, the IRS is soliciting... the result of gross negligence. Section 301.6103(n)-1(e)(3) of the final regulations require that... revenue law. Generally, tax returns and tax return information are confidential, as required by 26 U.S.C...

  13. 78 FR 47057 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2013-08-02

    ... Technical and Miscellaneous Revenue Act of 1988. This regulation enables taxpayers to take advantage of...: Individuals or households, business or other for- profit organizations, not-for-profit institutions, farms... information technology; and (e) estimates of capital or start-up costs and costs of operation, maintenance...

  14. 78 FR 29206 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2013-05-17

    ... taxpayers to take advantage of various benefits provided by the Internal Revenue Code. Current Actions... OMB approval. Affected Public: Individuals or households, Business or other for- profit organizations... capital or start-up costs and costs of operation, maintenance, and purchase of services to provide...

  15. 77 FR 35476 - Proposed Collection: Comment Request for Regulation Project

    Science.gov (United States)

    2012-06-13

    ... relating to structured settlement factoring transactions. DATES: Written comments should be received on or... INFORMATION: Title: Excise Tax Relating to Structured Settlement Factoring Transactions. OMB Number: 1545-1824... forms of information technology; and (e) estimates of capital or start-up costs and costs of operation...

  16. Rapid Acquisition Imaging Spectrograph (RAISE) Renewal Proposal Project

    Data.gov (United States)

    National Aeronautics and Space Administration — The optical design of RAISE is based on a new class of UV/EUV imaging spectrometers that use  only two reflections to provide quasi-stigmatic performance...

  17. 78 FR 54514 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2013-09-04

    ... accounting principles and permits functional reporting of certain items. Current Actions: There is no change... U.S. Persons with Respect to Certain Foreign Corporations. The regulation provides that financial...

  18. Oil shale research related to proposed nuclear projects

    Energy Technology Data Exchange (ETDEWEB)

    Carpenter, H C; Sohns, H W; Dinneen, G U [Laramie Petroleum Research Center, Bureau of Mines, Department of the Interior, Laramie, WY (United States)

    1970-05-15

    The Bureau of Mines is conducting research to develop data pertinent to in situ retorting of oil shale fractured by a nuclear explosion or other means. Maximum utilization of the Green River oil shale found in Colorado, Utah, and Wyoming, at depths ranging from outcrops to several thousand feet, requires development of several methods of processing. Early research was devoted to developing processes for application to oil shale occurring at depths suitable for mining. In present research, the emphasis is on in situ retorting and recovery processes that would be more satisfactory for oil shales occurring at greater depths. Development of an in situ process depends upon finding or establishing sufficient permeability in the oil shale beds for the passage of fluids which serve as a heat carrier in bringing the oil shale to retorting temperature. Use of a nuclear explosive seems to offer the best chance for successfully fracturing the thicker and more deeply buried portions of the deposit to give the required permeability. Processing the very large quantity of broken and fractured oil shale that would be produced presents many problems which require new background data for their solution. This paper describes research the Bureau of Mines is conducting to develop pertinent data. Primarily this research involves laboratory determination of properties of oil shale, pilot scale investigation of retorting characteristics of ungraded broken shale, and underground combustion of shale fractured by pressure and chemical explosives. Application of the research results should aid in designing the oil recovery phase and provide an estimate of the quantity of oil that may be obtained in a nuclear experiment in oil shale. (author)

  19. Learning Objects and the FATIH Project: Proposal of a Model

    Science.gov (United States)

    Eryilmaz, Selami

    2014-01-01

    Globalization together with new information and communication technologies (ICTs) and accelerated changes in society affect the economic and social life to a great extent. In order to achieve the goals mentioned in the strategy document, the necessary arrangements were made and FATIH (Increasing the opportunities and Technology Improvement…

  20. 75 FR 38184 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2010-07-01

    ...-8 provides final income, estate and gift, and employment tax regulations relating to elections made..., and purchase of services to provide information. Approved: June 23, 2010. Gerald J. Shields, IRS...

  1. 75 FR 42832 - Proposed Collection: Comment Request for Regulation Project

    Science.gov (United States)

    2010-07-22

    ... estate or gift tax return. Current Actions: There is no change to this existing regulation. Type of... capital or start-up costs and costs of operation, maintenance, and purchase of services to provide...

  2. 77 FR 50211 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2012-08-20

    ... business travel, entertainment, and gift expenses be substantiated with adequate records in accordance with... employees for, business expenses for travel, entertainment, gifts, or listed property are required to... capital or start-up costs and costs of operation, maintenance, and purchase of services to provide...

  3. 78 FR 17470 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2013-03-21

    ... Reduction Act of 1995, Public Law 104-13(44 U.S.C. 3506(c)(2)(A)). Currently, the IRS is soliciting comments concerning guidance necessary to facilitate business electronic filing (TD 9300(final)). DATES: Written....gov . SUPPLEMENTARY INFORMATION: Title: Guidance Necessary to Facilitate Business Electronic Filing...

  4. 78 FR 48771 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2013-08-09

    ... 1995, Public Law 104-13 (44 U.S.C. 3506(c)(2)(A)). Currently, the IRS is soliciting comments concerning... the collection of information displays a valid OMB control number. Books or records relating to a... administration of any internal revenue law. Generally, tax returns and tax return information are confidential...

  5. 77 FR 12646 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2012-03-01

    ... 1995, Public Law 104-13 (44 U.S.C. 3506(c)(2)(A)). Currently, the IRS is soliciting comments concerning... collection of information displays a valid OMB control number. Books or records relating to a collection of... internal revenue law. Generally, tax returns and tax return information are confidential, as required by 26...

  6. 77 FR 31913 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2012-05-30

    ... 1995, Public Law 104-13 (44 U.S.C. 3506(c)(2)(A)). Currently, the IRS is soliciting comments concerning... the collection of information displays a valid OMB control number. Books or records relating to a... administration of any internal revenue law. Generally, tax returns and tax return information are confidential...

  7. 76 FR 40449 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2011-07-08

    ... Reduction Act of 1995, Public Law 104-13 (44 U.S.C. 3506(c)(2)(A)). Currently, the IRS is soliciting... information unless the collection of information displays a valid OMB control number. Books or records... the administration of any internal revenue law. Generally, tax returns and tax return information are...

  8. 77 FR 17123 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2012-03-23

    ... 1995, Public Law 104-13(44 U.S.C. 3506(c)(2)(A)). The IRS is soliciting comments concerning information... the collection of information displays a valid OMB control number. Books or records relating to a... administration of any internal revenue law. Generally, tax returns and tax return information are confidential...

  9. 77 FR 6864 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2012-02-09

    ... 1995, Public Law 104-13 (44 U.S.C. 3506(c)(2)(A)). Currently, the IRS is soliciting comments concerning... information unless the collection of information displays a valid OMB control number. Books or records... the administration of any internal revenue law. Generally, tax returns and tax return information are...

  10. 78 FR 50142 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2013-08-16

    ... 1995, Public Law 104-13(44 U.S.C. 3506(c)(2)(A)). Currently, the IRS is soliciting comments concerning... the collection of information displays a valid OMB control number. Books or records relating to a... administration of any internal revenue law. Generally, tax returns and tax return information are confidential...

  11. 76 FR 77325 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2011-12-12

    ... 1995, Public Law 104-13 (44 U.S.C. 3506(c)(2)(A)). Currently, the IRS is soliciting comments concerning... information displays a valid OMB control number. Books or records relating to a collection of information must... revenue law. Generally, tax returns and tax return information are confidential, as required by 26 U.S.C...

  12. 78 FR 59768 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2013-09-27

    ... Reduction Act of 1995, Public Law 104-13(44 U.S.C. 3506(c)(2)(A)). Currently, the IRS is soliciting comments... the collection of information displays a valid OMB control number. Books or records relating to a... administration of any internal revenue law. Generally, tax returns and tax return information are confidential...

  13. 78 FR 25358 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2013-04-30

    ... 1995, Public Law 104-13 (44 U.S.C. 3506(c)(2)(A)). Currently, the IRS is soliciting comments concerning... information unless the collection of information displays a valid OMB control number. Books or records... the administration of any internal revenue law. Generally, tax returns and tax return information are...

  14. 76 FR 74118 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2011-11-30

    ... 1995, Public Law 104-13 (44 U.S.C. 3506(c)(2)(A)). Currently, the IRS is soliciting comments concerning... the collection of information displays a valid OMB control number. Books or records relating to a... administration of any internal revenue law. Generally, tax returns and tax return information are confidential...

  15. 77 FR 31914 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2012-05-30

    ... 1995, Public Law 104-13 (44 U.S.C. 3506(c)(2)(A)). Currently, the IRS is soliciting comments concerning... collection of information displays a valid OMB control number. Books or records relating to a collection of... internal revenue law. Generally, tax returns and tax return information are confidential, as required by 26...

  16. 78 FR 36640 - Proposed Collection; Comment Request for Regulations Project

    Science.gov (United States)

    2013-06-18

    ... 1995, Public Law 104-13 (44 U.S.C. 3506(c)(2)(A)). Currently, the IRS is soliciting comments concerning... displays a valid OMB control number. Books or records relating to a collection of information must be retained as long as their contents may become material in the administration of any internal revenue law...

  17. 78 FR 36639 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2013-06-18

    ... 1995, Public Law 104-13 (44 U.S.C. 3506(c)(2)(A)). Currently, the IRS is soliciting comments concerning... 501(c)(3). Such information exchange is necessary to ensure compliance with tax law requirements... collection of information unless the collection of information displays a valid OMB control number. Books or...

  18. 76 FR 21428 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2011-04-15

    ... administrative provisions of special application to manufacturers and retailers excise taxes. DATES: Written... Firearms and Other Administrative Provisions of Special Application to Manufacturers and Retailers Excise... tax is reported or excluded. Current Actions: There is no change to this existing regulation. Type of...

  19. 75 FR 51881 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2010-08-23

    ... Corporations. The regulation provides that financial statement information must be expressed in U.S. dollars translated according to U.S. generally accepted accounting principles and permits functional reporting of...

  20. Advanced Stellar Compass - Proposal for the SMART-1 Project

    DEFF Research Database (Denmark)

    Jørgensen, John Leif; Betto, Maurizio; Kilsgaard, Søren

    1998-01-01

    and autonomous Stellar Reference Unit designed, developed and produced by the Space Instrumentation Group of the Department of Automation of the Technical University of Denmark.The document is structured as follows. First we present the ASC - heritage, system description, performance - then we address more...... like manufacturing, transportation and storage, in section 10 the requirements imposed by the ASC on the system are given and to conclude we address the financial issues (sect. 11) and we review the ASC specifications against the SMART-1 requirements and provide the compliance matrices (sect. 12)....

  1. 76 FR 51127 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2011-08-17

    ... from tax under section 4082(a), it must be indelibly dyed by use of a mechanical dye injection system... information collection requirements related to diesel fuel and kerosene excise tax; dye injection. DATES.... ADDRESSES: Direct all written comments to Yvette B. Lawrence, Internal Revenue Service, Room 6129, 1111...

  2. 75 FR 28323 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2010-05-20

    ... assured of consideration. ADDRESSES: Direct all written comments to Gerald Shields, Internal Revenue... regulations provide rules authorizing employers to establish electronic systems for use by their tipped... amount of income tax and FICA tax to withhold from the tipped employee's wages. Current Actions: There...

  3. 78 FR 24813 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2013-04-26

    ... of consideration. ADDRESSES: Direct all written comments to Yvette Lawrence, Internal Revenue Service... regulations provide rules authorizing employers to establish electronic systems for use by their tipped... amount of income tax and FICA tax to withhold from the tipped employee's wages. Current Actions: There...

  4. 76 FR 33814 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2011-06-09

    ... collection requirements related to Additional First Year Depreciation Deduction. DATES: Written comments... . SUPPLEMENTARY INFORMATION: Title: Additional First Year Depreciation Deduction. OMB Number: 1545-2207... year depreciation deduction. Section 401(b) of the TRUIRJCA amends Sec. 168(k) by adding Sec. 168(k)(5...

  5. 75 FR 47896 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2010-08-09

    ... returns and return information based on a written request and the Commissioner's approval, to any authorized recipient set forth in Code section 6103, subject to the same conditions and restrictions, and for... information must be retained as long as their contents may become material in the administration of any...

  6. 75 FR 45122 - Periodic Summaries of Proposed Projects

    Science.gov (United States)

    2010-08-02

    .../AIDS, Viral Hepatitis, STD, and TB Prevention (NCHHSTP), Centers for Disease Control and Prevention..., viral hepatitis, sexually transmitted diseases (STDs), and tuberculosis (TB), as well as for community.... reference, referral, and distribution service for information on HIV/AIDS, viral hepatitis, STDs, and TB...

  7. 78 FR 60021 - Proposed Collection: Comment Request for Regulation Project

    Science.gov (United States)

    2013-09-30

    .... ADDRESSES: Direct all written comments to Yvette Lawrence, Internal Revenue Service, room 6129, 1111...). Abstract: The regulation imposes joint and several liability on the importer of record for the tax imposed on the entry of taxable fuel into the U.S. and revises definition of ``enterer''. Current Actions...

  8. 75 FR 53020 - Proposed Collection: Comment Request for Regulation Project

    Science.gov (United States)

    2010-08-30

    ... record for the tax imposed on the entry of taxable fuel into the U.S. and revises definition of ``enterer.... ADDRESSES: Direct all written comments to Gerald Shields, Internal Revenue Service, Room 6129, 1111... the administration of any internal revenue law. Generally, tax returns and tax return information are...

  9. 77 FR 65608 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2012-10-29

    ... be assured of consideration. ADDRESSES: Direct all written comments to Yvette Lawrence, Internal... the definition of parachute payment if certain requirements are met (such as shareholder approval and... material in the administration of any internal revenue law. Generally, tax returns and tax return...

  10. 75 FR 15487 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2010-03-29

    ... comments should be received on or before May 28, 2010 to be assured of consideration. ADDRESSES: Direct all... regulations relate to the computation of the credit under section 41(c) and the definition of qualified... contents may become material in the administration of any internal revenue law. Generally, tax returns and...

  11. 78 FR 10002 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2013-02-12

    ... comments should be received on or before April 15, 2013 to be assured of consideration. ADDRESSES: Direct...: FI-59-91. Abstract: This regulation relates to the tax treatment of debt instruments that provide for... an integrated transaction. The regulation provides general rules, definitions, and reporting and...

  12. 78 FR 39832 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2013-07-02

    ..., return requirements, definitions, and certain rules covering the generation-skipping transfer tax. The... generation-skipping transfer tax. DATES: Written comments should be received on or before September 3, 2013 to be assured of consideration. ADDRESSES: Direct all written comments to Yvette Lawrence, Internal...

  13. 78 FR 16916 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2013-03-19

    ... guidance to a passive foreign investment company (PFIC) shareholder that makes the election under Code... be received on or before May 20, 2013 to be assured of consideration. ADDRESSES: Direct all written... techniques or other forms of information technology; and (e) estimates of capital or start-up costs and costs...

  14. 77 FR 7241 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2012-02-10

    ... Internal Revenue Code section 1295 with respect to certain preferred shares of a passive foreign investment... be assured of consideration. ADDRESSES: Direct all written comments to Yvette B. Lawrence, Internal... through the use of automated collection techniques or other forms of information technology; and (e...

  15. 76 FR 74119 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2011-11-30

    ... Revenue Code section 1295 with respect to certain preferred shares of a passive foreign investment company... to be assured of consideration. ADDRESSES: Direct all written comments to Yvette B. Lawrence... through the use of automated collection techniques or other forms of information technology; and (e...

  16. 77 FR 70878 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2012-11-27

    ... through the internet at [email protected] . SUPPLEMENTARY INFORMATION: Title: Source of Income From... 1995. Currently, the IRS is soliciting comments concerning Source of Income From Sales of Inventory Partly From Sources Within a Possession of the United States; Also, Source of Income Derived From Certain...

  17. 78 FR 16919 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2013-03-19

    ... source of income from certain space and ocean activities; also, source of communications income. DATES... Constitution Avenue NW., Washington, DC 20224, or at (202) 622-6665, or through the Internet at [email protected] . SUPPLEMENTARY INFORMATION: Title: Source of Income from Certain Space and Ocean Activities...

  18. 77 FR 59454 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2012-09-27

    ... modifications of commercial mortgage loans held by a real estate mortgage investment conduit. DATES: Written... [email protected] . SUPPLEMENTARY INFORMATION: Title: Environmental Settlement Funds... matter of public record. Comments are invited on: (a) Whether the collection of information is necessary...

  19. Oil shale research related to proposed nuclear projects

    International Nuclear Information System (INIS)

    Carpenter, H.C.; Sohns, H.W.; Dinneen, G.U.

    1970-01-01

    The Bureau of Mines is conducting research to develop data pertinent to in situ retorting of oil shale fractured by a nuclear explosion or other means. Maximum utilization of the Green River oil shale found in Colorado, Utah, and Wyoming, at depths ranging from outcrops to several thousand feet, requires development of several methods of processing. Early research was devoted to developing processes for application to oil shale occurring at depths suitable for mining. In present research, the emphasis is on in situ retorting and recovery processes that would be more satisfactory for oil shales occurring at greater depths. Development of an in situ process depends upon finding or establishing sufficient permeability in the oil shale beds for the passage of fluids which serve as a heat carrier in bringing the oil shale to retorting temperature. Use of a nuclear explosive seems to offer the best chance for successfully fracturing the thicker and more deeply buried portions of the deposit to give the required permeability. Processing the very large quantity of broken and fractured oil shale that would be produced presents many problems which require new background data for their solution. This paper describes research the Bureau of Mines is conducting to develop pertinent data. Primarily this research involves laboratory determination of properties of oil shale, pilot scale investigation of retorting characteristics of ungraded broken shale, and underground combustion of shale fractured by pressure and chemical explosives. Application of the research results should aid in designing the oil recovery phase and provide an estimate of the quantity of oil that may be obtained in a nuclear experiment in oil shale. (author)

  20. 75 FR 40029 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2010-07-13

    ... Expenses Reporting and Withholding on Employee Business Expense Reimbursements and Allowances (Sec. 1.62-2...: Employee Business Expenses-Reporting and Withholding on Employee Business Expense Reimbursements and..., payments with respect to employee business expenses under a reimbursement or other expense allowance...

  1. 75 FR 40029 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2010-07-13

    ... limits its member's liability are available to satisfy creditors' claims under local law. The regulation... that in determining the extent to which a partner bears the economic risk of loss for a partnership...

  2. 78 FR 50141 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2013-08-16

    ... limits its member's liability are available to satisfy creditors' claims under local law. The regulation... that in determining the extent to which a partner bears the economic risk of loss for a partnership...

  3. 75 FR 60508 - Proposed Collection: Comment Request for Regulation Project

    Science.gov (United States)

    2010-09-30

    ... ``direct rollover'' transaction. These provisions also require qualified pension plans and tax-sheltered... comments concerning an existing final regulation, EE-43-92 (TD 8619), Direct Rollovers and 20- Percent... November 29, 2010 to be assured of consideration. ADDRESSES: Direct all written comments to Gerald Shields...

  4. 78 FR 27298 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2013-05-09

    ... Foreign Tax Credit; Notification and Adjustment Due to Foreign Tax Redeterminations. DATES: Written comments should be received on or before July 8, 2013 to be assured of consideration. ADDRESSES: Direct [email protected] . SUPPLEMENTARY INFORMATION: Title: Foreign Tax Credit; Notification and Adjustment Due to...

  5. 78 FR 22037 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2013-04-12

    ... the branch tax; the branch profits Tax; and the regulations on effectively connected income and the branch profits tax (Sec. Sec. 1.884-1, 1.884-2, 1.884-2T, 1.884-4, 1.884-5). DATES: Written comments should be received on or before June 11, 2013 to be assured of consideration. ADDRESSES: Direct all...

  6. 78 FR 69939 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2013-11-21

    ... revision of Income Tax Regulations under Sections 358, 367, 884, and 6038B Dealing with Statutory Mergers.... ADDRESSES: Direct all written comments to Yvette Lawrence, Internal Revenue Service, Room 6129, 1111....gov . SUPPLEMENTARY INFORMATION: Title: Revision of Income Tax Regulations under Sections 358, 367...

  7. 78 FR 63568 - Proposed Collection: Comment Request for Regulation Project

    Science.gov (United States)

    2013-10-24

    ... December 23, 2013 to be assured of consideration. ADDRESSES: Direct all written comments to Yvette Lawrence... returns, and corporations that enter into certain tax-free reorganizations. The regulations provide rules for determining the tax consequences of a member's transfer (including by deconsolidation and...

  8. 77 FR 68888 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2012-11-16

    .... Abstract: This regulation prevents elimination of corporate-level tax because of the operation of the... approved collection. Affected Public: Business or other for-profit organizations. Estimated Number of... will be summarized and/or included in the request for OMB approval. All comments will become a matter...

  9. 78 FR 48229 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2013-08-07

    ... distributions to verify compliance with section 529 and to determine the taxable amount of a distribution.... Generally, tax returns and tax return information are confidential, as required by 26 U.S.C. 6103. Request... information technology; and (e) estimates of capital or start-up costs and costs of operation, maintenance...

  10. 78 FR 58609 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2013-09-24

    ... or deferred arrangements under section 401(k). The IRS needs this information to insure compliance... material in the administration of any internal revenue law. Generally, tax returns and tax return...) estimates of capital or start-up costs and costs of operation, maintenance, and purchase of services to...

  11. 78 FR 40827 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2013-07-08

    ... registration requirements with respect to certain debt obligations; application of repeal of 30 percent... INFORMATION: Title: Registration Requirements With Respect to Certain Debt Obligations; Application of Repeal... reporting requirements with respect to ownership, transfers, and payments on the obligations. The reporting...

  12. 75 FR 13207 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2010-03-18

    ... Respect to Certain Debt Obligations; Application of Repeal of 30 Percent Withholding by the Tax Reform [email protected].gov . SUPPLEMENTARY INFORMATION: Title: Registration Requirements With Respect to Certain Debt... if they comply with reporting requirements with respect to ownership, transfers, and payments on the...

  13. 78 FR 42591 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2013-07-16

    ... consent of taxpayers before representing conflicting interests; (3) practitioners do not use e-commerce to... through the use of automated collection techniques or other forms of information technology; and (e...

  14. 77 FR 63923 - Proposed Collection; Comment Request for Regulation Project

    Science.gov (United States)

    2012-10-17

    ... Wellstone and Pete Domenici Mental Health Parity and Addiction Equity Act of 2008, which requires parity... forms of information technology; and (e) estimates of capital or start-up costs and costs of operation...

  15. 78 FR 44135 - Proposed Collection; 60-Day Comment Request: Application for the Postdoctoral Research Associate...

    Science.gov (United States)

    2013-07-23

    ... comments in writing or request more information on the proposed project, contact Ms. Tammy Dean-Maxwell... public comment on proposed data collection projects, the National Institute of General Medical Sciences (NIGMS), the National Institutes of Health (NIH) will publish periodic summaries of proposed projects to...

  16. Circular fringe projection profilometry.

    Science.gov (United States)

    Zhao, Hong; Zhang, Chunwei; Zhou, Changquan; Jiang, Kejian; Fang, Meiqi

    2016-11-01

    In this Letter, a novel three-dimensional (3D) measurement method, called the circular fringe projection profilometry (CFPP), is proposed. Similar to the conventional fringe projection profilometry, CFPP also requires fringe pattern projection and capture, phase demodulation, and phase unwrapping. However, it works with a totally different mechanism. CFPP recovers the height of a point by calculating its distance to the optical center of a projector along the optical axis. This distance is calculated with the aid of the divergence angle of a projected light ray and the distance between the measured point and the optical axis. The distance between the measured point and the optical axis is detected by a camera with telecentric lenses, while the divergence angle can be calculated from the phase of a captured circular fringe pattern. The validity of CFPP is confirmed by a set of experiments.

  17. COMPASS-II Proposal

    CERN Document Server

    Gautheron, F; Koivuniemi, J; Meyer, W; Reicherz, G; Bisplinghoff, J; Eversheim, D; Hinterberger, F; Jahn, R; Joosten, R; Negrini, T; Barth, J; Klein, F; Goertz, S; Panknin, R; Pretz, J; Windmolders, R; Srnka, A; Dasgupta, S; Dhara, L; Sarkara, S; Sinha, L; Alexakhin, V Yu; Alexeev, G D; Anosov, V A; Antonov, A; Efremov, A; Gavrichtchouk, O P; Guskov, A; Ivanshin, Yu; Ivanov, O; Kisselev, Yu; Kouznetsov, O; Kroumchtein, Z; Meshcheryakov, G V; Nagaytsev, A; Olshevski, A; Peshekhonov, D V; Pontecorvo, G; Rossiyskaya, N; Sapozhnikov, M G; Savin, I A; Shevchenko, O Yu; Sissakian, A N; Smirnov, G I; Teryaev, O V; Tkatchev, L G; Vlassov, N V; Zemlyanichkina, E; Adolph, Ch; Braun, Ch; Eyrich, W; Lehmann, A; Richter, A; Fischer, H; Heinsius, F-H; Herrmann, F; Guthörl, T; Lauser, L; Königsmann, K; Nerling, F; Schill, Ch; Wollny, H; Schmidt, K; Schopferer, S; Mallot, G K; Nowak, W-D; Schönning, K; Schott, M; Sulc, M; Bordalo, P; Franco, C; Nunes, A S; Quintans, C; Ramos, S; Silva, L; Stolarski, M; Bernhard, J; Chaberny, D; du Fresne von Hohenesche, N; von Harrach, D; Jasinski, P; Kabuß, E M; Kang, D-H; Ostrick, M; Pochodzalla, J; Alexandrov, Yu; Zavertyaev, M; Böhmer, F; Dørheim, S; Friedrich, J M; Gerassimov, S; Grabmüller, S; Grube, B; Haas, F; Höppner, Ch; Ketzer, B; Konorov, I; Krämer, M; Mann, A; Nagel, T; Neubert, S; Paul, S; Schmitt, L; Uhl, S; Bettinelli, M; Dünnweber, W; Faessler, M A; Geyer, R; Rajotte, J-F; Schlüter, T; Uman, I; Zvyagin, A; Finger, M; Finger jr, M; Slunecka, M; Jary, V; Virius, M; Donskov, S V; Filin, A; Khaustov, G V; Khokhlov, Yu; Kolosov, V; Konstantinov, V; Lednev, A A; Mikhailov, Yu V; Nikolaenko, V I; Polyakov, V A; Ryabchikov, D; Samoylenko, V D; Bedfer, Y; Burtin, E; Ferrero, A; d’Hose, N; Kunne, F; Magnon, A; Makke, N; Marchand, C; Morreale, A; Neyret, D; Platchkov, S; Vandenbroucke, M; Lichtenstadt, J; Moinester, M A; Birsa, R; Bradamante, F; Bressan, A; Dalla Torre, S; Duic, V; Elia, C; Giorgi, M; Gobbo, B; Levorato, S; Martin, A; Pesaro, G; Rocco, E; Sbrizzai, G; Schiavon, P; Sozzi, F; Tessaro, S; Tessarotto, F; Alexeev, M G; Amoroso, A; Balestra, F; Bertini, R; Chiosso, M; Denisov, O; Garfagnini, R; Gnesi, I; Grasso, A; Kotzinian, A; Maggiora, A; Melis, S; Panzieri, D; Parsamyan, B; Piragino, G; Sosio, S; Takekawa, S; Badelek, B; Brona, G; Gazda, R; Klimaszewski, K; Kurek, K; Rondio, E; Sandacz, A; Sznajder, P; Wislicki, W; Marzec, J; Dziewiecki, M; Sulej, R; Zaremba, K; Ziembicki, M; Doshita, N; Iwata, T; Ishimoto, S; Horikawa, N; Kondo, K; Matsuda, T; Miyachi, Y

    2010-01-01

    The proposed new measurements comprise a Generalised Parton Distributions programme, an unpolarised PDF and FF programme, a transverse momentum dependent PDF programme and a programme for tests of chiral perturbation theory.

  18. The Mississippi CCS Project

    Energy Technology Data Exchange (ETDEWEB)

    Doug Cathro

    2010-09-30

    The Mississippi CCS Project is a proposed large-scale industrial carbon capture and sequestration (CCS) project which would have demonstrated advanced technologies to capture and sequester carbon dioxide (CO{sub 2}) emissions from industrial sources into underground formations. Specifically, the Mississippi CCS Project was to accelerate commercialization of large-scale CO{sub 2} storage from industrial sources by leveraging synergy between a proposed petcoke to Substitute Natural Gas (SNG) plant that is selected for a Federal Loan Guarantee and would be the largest integrated anthropogenic CO{sub 2} capture, transport, and monitored sequestration program in the U.S. Gulf Coast Region. The Mississippi CCS Project was to promote the expansion of enhanced oil recovery (EOR) in the Mississippi, Alabama and Louisiana region which would supply greater energy security through increased domestic energy production. The capture, compression, pipeline, injection, and monitoring infrastructure would have continued to sequester CO{sub 2} for many years after the completion of the term of the DOE agreement. The objectives of this project were expected to be fulfilled through two distinct phases. The overall objective of Phase 1 was to develop a fully definitive project basis for a competitive Renewal Application process to proceed into Phase 2 - Design, Construction and Operations. Phase 1 included the studies that establish the engineering design basis for the capture, compression and transportation of CO{sub 2} from the MG SNG Project, and the criteria and specifications for a monitoring, verification and accounting (MVA) plan at the Soso oil field in Mississippi. The overall objective of Phase 2, was to execute design, construction and operations of three capital projects: the CO{sub 2} capture and compression equipment, the Mississippi CO{sub 2} Pipeline to Denbury's Free State Pipeline, and an MVA system at the Soso oil field.

  19. Configurable Project Collaboration Portal, Phase I

    Data.gov (United States)

    National Aeronautics and Space Administration — SplashNote Systems is proposing to develop a more effective and innovative approach to project collaboration in distributed teams. The proposed system uniquely gives...

  20. Return on investment (ROI) proposal preparation guide

    International Nuclear Information System (INIS)

    BOOM, R.J.

    1999-01-01

    Section I: Background Return on Investment (ROI) Proposal Preparation Guide-- Over $1.9M is available to fund fiscal year (FY) 2000 waste minimization projects on the Hanford Site. This money was allocated by the US. Department of Energy Headquarters (DOE-HQ). The U.S. Department of Energy, Richland Operations (RL) and the U.S. Department of Energy, Office of River Protection (ORP) are currently seeking pollution prevention proposals from across the Hanford Site that provide a high return-on-investment (ROI) by reducing waste and associated management costs. Purpose of ROI Training The ROI Proposal Preparation Guide is a tool to assist Hanford waste generators in preparing ROI proposal forms for submittal to RL for funding. The guide describes the requirements for submitting an ROI proposal and provides examples of completed ROI forms. The intent is to assist waste generators in identifying projects that meet the criteria, provide information necessary to complete the ROI forms, and submit a proposal that is eligible to receive funding. This guide accompanies the one-hour training workshop on how to prepare and submit an ROI proposal