WorldWideScience

Sample records for project involves processing

  1. Stake holder involvement in the Canadian review process for uranium production projects in Northern Saskatchewan

    International Nuclear Information System (INIS)

    Underhill, D.

    2004-01-01

    This report describes the Canadian environmental review process for uranium production projects as a case study for the purpose of understanding the nature and value of stakeholder involvement in the management of radiological hazards. While the Canadian review process potentially applies to any development, this case study focuses on the assessment of the uranium projects of northern Saskatchewan conducted during the 1990's. It describes the environmental assessment (EA) conducted in the 1990's for six new uranium facilities (including mines and mills and related tailings disposal sites) planned in northern Saskatchewan. Both the Canadian federal and the Saskatchewan provincial government have extensive environmental review processes that must under law be complete before any major industrial development judged to have potential environmental impacts is undertaken within their respective territories. However, even in those instances where no clear potential environmental impacts are evident, Canadian law mandates 'if public concern about the proposal is such that a public review is desirable, the initiating department shall refer the proposal to the Minister for review by a Panel'. (Wh95) As a stakeholder under law, in both Canada and Saskatchewan, the public plays an important role in the environmental review process. To encourage participation and assist the public in its review the two governments may provide funding (as done in this review) to assist qualified individuals or groups to participant in the review process. The first section of this case study sets the scene. It describes the Saskatchewan uranium mining story, focusing on how the importance of the public stakeholder evolved to become a major component, under law, in the EA process for new uranium mines. This increase in stakeholder involvement opportunities coincided with heightened public concern for the socio-economic impacts of the projects. In the late 1980's both governments were advised by

  2. Public involvement in multi-objective water level regulation development projects-evaluating the applicability of public involvement methods

    International Nuclear Information System (INIS)

    Vaentaenen, Ari; Marttunen, Mika

    2005-01-01

    Public involvement is a process that involves the public in the decision making of an organization, for example a municipality or a corporation. It has developed into a widely accepted and recommended policy in environment altering projects. The EU Water Framework Directive (WFD) took force in 2000 and stresses the importance of public involvement in composing river basin management plans. Therefore, the need to develop public involvement methods for different situations and circumstances is evident. This paper describes how various public involvement methods have been applied in a development project involving the most heavily regulated lake in Finland. The objective of the project was to assess the positive and negative impacts of regulation and to find possibilities for alleviating the adverse impacts on recreational use and the aquatic ecosystem. An exceptional effort was made towards public involvement, which was closely connected to planning and decision making. The applied methods were (1) steering group work, (2) survey, (3) dialogue, (4) theme interviews, (5) public meeting and (6) workshops. The information gathered using these methods was utilized in different stages of the project, e.g., in identifying the regulation impacts, comparing alternatives and compiling the recommendations for regulation development. After describing our case and the results from the applied public involvement methods, we will discuss our experiences and the feedback from the public. We will also critically evaluate our own success in coping with public involvement challenges. In addition to that, we present general recommendations for dealing with these problematic issues based on our experiences, which provide new insights for applying various public involvement methods in multi-objective decision making projects

  3. Communication and Stakeholder Involvement in Environmental Remediation Projects

    International Nuclear Information System (INIS)

    2014-01-01

    The way in which members of the public perceive a contamination situation and an approach to the remediation of contaminated land will influence the decision making process in a variety of ways. Through communication between experts, decision makers and members of stakeholder communities, participatory processes and negotiation between different interest groups can sometimes be used effectively as mechanisms for improving the overall decision making process. The intention is to ensure a technically sound and socially acceptable decision that meets norms of adequacy or satisfactory performance in relation to a whole range of different concerns. Good communication strategies will encourage cooperation and understanding between different interested parties in remediation projects. Involvement of affected or interested persons can prevent fear driven reactions, which potentially damage public response and create undue expectations or unnecessary anxiety. For all environmental remediation (ER) cases, there is a risk that the process will fail if it does not respect social, environmental, political and economic dimensions. This requires open, clear and mutually agreed lines of communication among stakeholders within a well defined legal framework. A general recommendation is to involve them from a very early point in the process. This publication presents ER in plain language in such a way that implementers and regulators can communicate the motives and objectives of remediation projects to a variety of stakeholder communities in order to improve mutual understanding and facilitate dialogue between interested parties. ER is considered from two perspectives: technical and non-technical. A section that gives general ideas on the strategies to deal with stakeholder involvement and which discusses different aspects of the communication approaches in ER is then included. It is recognized that social, cultural and political situations are very diverse in different countries in

  4. Communication and Stakeholder Involvement in Environmental Remediation Projects

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2014-05-15

    The way in which members of the public perceive a contamination situation and an approach to the remediation of contaminated land will influence the decision making process in a variety of ways. Through communication between experts, decision makers and members of stakeholder communities, participatory processes and negotiation between different interest groups can sometimes be used effectively as mechanisms for improving the overall decision making process. The intention is to ensure a technically sound and socially acceptable decision that meets norms of adequacy or satisfactory performance in relation to a whole range of different concerns. Good communication strategies will encourage cooperation and understanding between different interested parties in remediation projects. Involvement of affected or interested persons can prevent fear driven reactions, which potentially damage public response and create undue expectations or unnecessary anxiety. For all environmental remediation (ER) cases, there is a risk that the process will fail if it does not respect social, environmental, political and economic dimensions. This requires open, clear and mutually agreed lines of communication among stakeholders within a well defined legal framework. A general recommendation is to involve them from a very early point in the process. This publication presents ER in plain language in such a way that implementers and regulators can communicate the motives and objectives of remediation projects to a variety of stakeholder communities in order to improve mutual understanding and facilitate dialogue between interested parties. ER is considered from two perspectives: technical and non-technical. A section that gives general ideas on the strategies to deal with stakeholder involvement and which discusses different aspects of the communication approaches in ER is then included. It is recognized that social, cultural and political situations are very diverse in different countries in

  5. ACACIA Project - Development of a Post-Combustion CO2 Capture Process. Case of the DMXTM Process

    International Nuclear Information System (INIS)

    Gomez, A.; Briot, P.; Raynal, L.; Broutin, P.; Gimenez, M.; Soazic, M.; Cessat, P.; Saysset, S.

    2014-01-01

    The objective of the ACACIA project was to develop processes for post-combustion CO 2 capture at a lower cost and with a higher energetic efficiency than first generation processes using amines such as Monoethanolamine (MEA) which are now considered for the first Carbon Capture and Storage (CCS) demonstrators. The partners involved in this project were: Rhodia (Solvay since then), Arkema, Lafarge, GDF SUEZ, Veolia Environnement, IFP Energies nouvelles, IRCE Lyon, LMOPS, LTIM, LSA Armines. To validate the relevance of the breakthrough processes studied in this project, techno-economic evaluations were carried out with comparison to the reference process using a 30 wt% MEA solvent. These evaluation studies involved all the industrial partners of the project, each partner bringing specific cases of CO 2 capture on their industrial facilities. From these studies, only the process using de-mixing solvent, DMX TM , developed by IFPEN appears as an alternative solution to the MEA process. (authors)

  6. Early Involvement and Integration in Construction Projects: The Benefits of DfX in Elimination of Wastes

    Directory of Open Access Journals (Sweden)

    Heikki Halttula

    2017-12-01

    Full Text Available Typical construction processes provide waste: material waste but especially process-related waste. The majority of this waste can be avoided with efficient planning in the front end of projects. The main aim is to describe how the concept of Design for Excellence (DfX can reduce the most severe waste in construction projects. Based on a literature review of waste and requirements that aid early involvement and integration, we created a survey for analyzing and prioritizing types of waste in the construction industry. We describe how DFX reduces this waste, especially through the use of early involvement and integration. When applied, DfX creates incentives for project stakeholders to eliminate waste automatically through early involvement and integration.

  7. Undergraduate Research Involving Deaf and Hard-of-Hearing Students in Interdisciplinary Science Projects

    Directory of Open Access Journals (Sweden)

    Todd Pagano

    2015-05-01

    Full Text Available Scientific undergraduate research in higher education often yields positive outcomes for student and faculty member participants alike, with underrepresented students often showing even more substantial gains (academic, professional, and personal as a result of the experience. Significant success can be realized when involving deaf and hard-of-hearing (d/hh undergraduate students, who are also vastly underrepresented in the sciences, in interdisciplinary research projects. Even d/hh Associate degree level students and those in the first two years of their postsecondary careers can contribute to, and benefit from, the research process when faculty mentors properly plan/design projects. We discuss strategies, including the dissemination/communication of research results, for involving these students in research groups with different communication dynamics and share both findings of our research program and examples of successful chemical and biological research projects that have involved d/hh undergraduate students. We hope to stimulate a renewed interest in encouraging diversity and involving students with disabilities into higher education research experiences globally and across multiple scientific disciplines, thus strengthening the education and career pipeline of these students.

  8. Proposed Tenaska Washington II Generation Project : Final Environmental Impact Statement. Volume 2: Public Involvement.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1994-01-01

    In regard to the proposed Tenaska Washington II Generation Project, the goal of the Bonneville Power Administration`s (BPA) Environmental Impact Statement (EIS) public involvement process is to determine the issues to be examined and pertinent analyses to be conducted and to solicit comments on the content and quality of information presented in the Draft Environmental Impact Statement (DEIS). Comments and questions are solicited from the public and government agencies during the scoping process and during the comment period and public hearing on the DEIS, to find out what is of most concern to them. The end product of the public involvement process is the Comment Report which follows in part of this volume on Public Involvement.

  9. Impact of Requirements Elicitation Processes on Success of Information System Development Projects

    Directory of Open Access Journals (Sweden)

    Bormane Līga

    2016-12-01

    Full Text Available Requirements articulating user needs and corresponding to enterprise business processes are a key to successful implementation of information system development projects. However, the parties involved in projects frequently are not able to agree on a common development vision and have difficulties expressing their needs. Several industry experts have acknowledged that requirements elicitation is one of the most difficult tasks in development projects. This study investigates the impact of requirements elicitation processes on project outcomes depending on the applied project development methodology.

  10. Environmental assessment of nuclear projects in Canada - process, participation, lessons learned

    International Nuclear Information System (INIS)

    Underdown, G.A.; Brown, P.A.; Morrison, R.W.

    1995-01-01

    This paper documents public participation in decision-making for five cases of nuclear-based projects in Canada. Two cases involve the application of the Federal Environmental Assessment and Review Process (EARP), a formal, non-judicial process for public involvement in projects with a potential environmental impact. It is being applied to the development of new Uranium mines and the disposal of used nuclear fuels. The siting of radioactive waste facilities, generally unwanted by the communities, presents many difficult challenges which needs to be addressed before a project goes through the EARP process. An open, consultative, community-based approach to decision-making about siting is being applied in the three cases: Port Hope, Scarborough and Surrey. A number of lessons have been learned, the most important that there is a need to establish an acceptable process that includes 'getting the science right' on a project before attempting to find a site. The EARP, in most cases, provides a good mechanism for the sharing of information about a potential between the proponents and the public as long as there are no major unresolved contentious issues such as the unwanted siting of a waste facility in a particular community. 19 refs

  11. Can the BestGrid Process Improve Stakeholder Involvement in Electricity Transmission Projects?

    Directory of Open Access Journals (Sweden)

    Nadejda Komendantova

    2015-08-01

    Full Text Available The European Union has set ambitious targets for deployment of renewable energy sources to reach goals of climate change mitigation and energy security policies. However, the current state of electricity transmission infrastructure is a major bottleneck for further scaling up of renewable energy in the EU. Several thousands of kilometers of new lines have to be constructed and upgraded to accommodate growing volumes of intermittent renewable electricity. In many countries, construction of electricity transmission projects has been delayed for several years due to concerns of local stakeholders. The innovative BESTGRID approach, reported here, brings together transmission system operators (TSOs and non-governmental organizations (NGOs to discuss and understand the nature of stakeholder concerns. This paper has three objectives: (1 to understand stakeholder concerns about the deployment of electricity transmission grids in four pilot projects according to five guiding principles: need, transparency, engagement, environment, and impacts on human health as well as benefits; (2 to understand how these principles can be addressed to provide a basis for better decision-making outcomes; and (3 to evaluate the BESTGRID process based on feedback received from stakeholders and the level of participation achieved according to the ladder of Arnstein. This paper goes beyond a discussion of “measures to mitigate opposition” to understand how dialogue between TSOs and the public—represented mainly by NGOs and policy-makers—might lead to a better decision-making process and more sustainable electricity transmission infrastructure deployment.

  12. The Process to Estimate Economical Benefits of Six Sigma Projects

    Directory of Open Access Journals (Sweden)

    Jan Kosina

    2013-07-01

    Full Text Available This paper seeks to define the process for the continuous evaluation of the financial benefits during Six Sigma project life time. The financial criteria are critical success factors of a Six Sigma project. The process has been developed as part of the six sigma project monitoring in order to estimate proper allocation of the resources taking in account the expected project benefits as well as evaluationof real achievements. The evaluation of the finacial benefits based on the quality costs is not sufficient in the real life and has to be accomplished with key financial performance indicators of the business to visualize the results. The evaluation based on the savings seems to be too difficult especially for green belts. The early involvement of the finance department in the project definition as well as ongoing evaluation is key. The defined process has been applied to real business enviroment.

  13. The use of public participation and economic appraisal for public involvement in large-scale hydropower projects: Case study of the Nam Theun 2 Hydropower Project

    International Nuclear Information System (INIS)

    Mirumachi, Naho; Torriti, Jacopo

    2012-01-01

    Gaining public acceptance is one of the main issues with large-scale low-carbon projects such as hydropower development. It has been recommended by the World Commission on Dams that to gain public acceptance, public involvement is necessary in the decision-making process (). As financially-significant actors in the planning and implementation of large-scale hydropower projects in developing country contexts, the paper examines the ways in which public involvement may be influenced by international financial institutions. Using the case study of the Nam Theun 2 Hydropower Project in Laos, the paper analyses how public involvement facilitated by the Asian Development Bank had a bearing on procedural and distributional justice. The paper analyses the extent of public participation and the assessment of full social and environmental costs of the project in the Cost-Benefit Analysis conducted during the project appraisal stage. It is argued that while efforts were made to involve the public, there were several factors that influenced procedural and distributional justice: the late contribution of the Asian Development Bank in the project appraisal stage; and the issue of non-market values and discount rate to calculate the full social and environmental costs. - Highlights: ► Public acceptance in large-scale hydropower projects is examined. ► Both procedural and distributional justice are important for public acceptance. ► International Financial Institutions can influence the level of public involvement. ► Public involvement benefits consideration of non-market values and discount rates.

  14. Public involvement in decision making process in nuclear field

    International Nuclear Information System (INIS)

    Constantin, M.; Diaconu, D.

    2009-01-01

    Decision Making Process (DMP) in nuclear field is influenced by multiple factors such as: complex technical aspects, diversity of stakeholders, long term risks, psychological stresses, societal attitudes, etc. General public is sometimes considered as the only one of stakeholders, the involvement of the public being seen as a factor to obtain the acceptance in the late phase of DMP. Generally it is assessed by public consultation on the environment impact studies and by approval of the sitting through the local authorities decision. Modern society uses methods to involve public from the beginning of DMP. The paper shows a general view of the methods and tools used in Europe for public involvement in DMP. The process of construction of a continuous democratic dialog inside of Romanian Stakeholder Group (RSG) in the frame of the FP6-COWAM2 and CIP projects is presented with a focusing of the barriers and factors of disturbing the trust and collaboration between stakeholders. The influence on the public acceptance is also discussed. (authors)

  15. User involvement in the innovation process

    DEFF Research Database (Denmark)

    Christensen, Dan Saugstrup

    2008-01-01

    User involvement in the innovation process is not a new phenomenon. However, combined with the growing individualisation of demand and with highly competitive and dynamic environments, user involvement in the innovation process and thereby in the design, development, and manufacturing process, can...... nevertheless provide a competitive advantage. This is the case as an intensified user involvement in the innovation process potentially results in a more comprehensive understanding of the user needs and requirements and the context within which these are required, and thereby provides the possibility...... of developing better and more suitable products. The theoretical framework of this thesis is based on user involvement in the innovation process and how user involvement in the innovation process can be deployed in relation to deriving and colleting user needs and requirements, and thereby serves...

  16. PROJECT SCOPE MANAGEMENT PROCESS

    Directory of Open Access Journals (Sweden)

    Yana Derenskaya

    2018-01-01

    Full Text Available The purpose of the article is to define the essence of project scope management process, its components, as well as to develop an algorithm of project scope management in terms of pharmaceutical production. Methodology. To carry out the study, available information sources on standards of project management in whole and elements of project scope management in particular are analysed. Methods of system and structural analysis, logical generalization are used to study the totality of subprocesses of project scope management, input and output documents, and to provide each of them. Methods of network planning are used to construct a precedence diagram of project scope management process. Results of the research showed that components of the project scope management are managing the scope of the project product and managing the content of project work. It is the second component is investigated in the presented work as a subject of research. Accordingly, it is defined that project scope management process is to substantiate and bring to the realization the necessary amount of work that ensures the successful implementation of the project (achievement of its goal and objectives of individual project participants. It is also determined that the process of managing the project scope takes into account the planning, definition of the project scope, creation of the structure of project work, confirmation of the scope and management of the project scope. Participants of these subprocesses are: customer, investor, and other project participants – external organizations (contractors of the project; project review committee; project manager and project team. It is revealed that the key element of planning the project scope is the formation of the structure of design work, the justification of the number of works, and the sequence of their implementation. It is recommended to use the following sequence of stages for creating the structure of project work

  17. Project management process.

    Science.gov (United States)

    2007-03-01

    This course provides INDOT staff with foundational knowledge and skills in project management principles and methodologies. INDOTs project management processes provide the tools for interdisciplinary teams to efficiently and effectively deliver pr...

  18. Development of an Improved Process for Installation Projects of High Technology Manufacturing Equipment

    Energy Technology Data Exchange (ETDEWEB)

    Quintana, Sarah V. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2014-04-30

    High technology manufacturing equipment is utilized at Los Alamos National Laboratory (LANL) to support nuclear missions. This is undertaken from concept initiation where equipment is designed and then taken through several review phases, working closely with system engineers (SEs) responsible for each of the affected systems or involved disciplines (from gasses to HVAC to structural, etc.). After the design is finalized it moves to procurement and custom fabrication of the equipment and equipment installation, including all of the paperwork involved. Not only are the engineering and manufacturing aspects important, but also the scheduling, financial forecasting, and planning portions that take place initially and are sometimes modified as the project progresses should requirements, changes or additions become necessary. The process required to complete a project of this type, including equipment installation, is unique and involves numerous steps to complete. These processes can be improved and recent work on the Direct Current Arc (DC Arc) Glovebox Design, Fabrication and Installation Project provides an opportunity to identify some important lessons learned (LL) that can be implemented in the future for continued project improvement and success.

  19. Sunray project - A long-term, nationwide educational process

    International Nuclear Information System (INIS)

    Nikula, Anneli

    2000-01-01

    The Sunray project is a nationwide educational process coordinated by the Economic Information Bureau (TaT Group) for ninth graders in Finnish comprehensive schools. The project aims at giving thorough and versatile information on radiation within the framework of various subjects (physics, biology, domestic science, history, European languages, mother tongue, health education etc.). The Sunray project covers all ninth graders of the existing 600 Finnish comprehensive schools; in all involving some 65 000 pupils. The project, which has been repeated five times, was initiated as part of the European Science and Technology week in 1995. During the first two years it was strongly linked with the science week as natural sciences were seen as a good framework for the chosen perspective. Since 1997, the project has been run as an event in its own right. The project has applied the method of processing integrated groups of themes, which is an objective of the comprehensive school system and the experimental method of science. As schools make their own decisions about the educational programmes to be adopted every semester, the project has been marketed to schools at the beginning of May. The TaT Group has arranged marketing events in some 10 localities in Finland. The Economic Information Bureau of Finland coordinates the project and in 1995-2000 the Radiation and Nuclear Safety Authority (STUK), the Finnish Energy Industries' Federation, the Finnish Electricity Association, Fortum Oyj and Teollisuuden Voima Oy have participated in the project

  20. Being useful: achieving indigenous youth involvement in a community-based participatory research project in Alaska

    Directory of Open Access Journals (Sweden)

    Tara Ford

    2012-05-01

    Full Text Available Objectives. To report on a participatory research process in southwest Alaska focusing on youth involvement as a means to facilitate health promotion. We propose youth-guided community-based participatory research (CBPR as way to involve young people in health promotion and prevention strategizing as part of translational science practice at the community-level. Study design. We utilized a CBPR approach that allowed youth to contribute at all stages. Methods. Implementation of the CBPR approach involved the advancement of three key strategies including: (a the local steering committee made up of youth, tribal leaders, and elders, (b youth-researcher partnerships, and (c youth action-groups to translate findings. Results. The addition of a local youth-action and translation group to the CBPR process in the southwest Alaska site represents an innovative strategy for disseminating findings to youth from a research project that focuses on youth resilience and wellbeing. This strategy drew from two community-based action activities: (a being useful by helping elders and (b being proud of our village. Conclusions. In our study, youth informed the research process at every stage, but most significantly youth guided the translation and application of the research findings at the community level. Findings from the research project were translated by youth into serviceable action in the community where they live. The research created an experience for youth to spend time engaged in activities that, from their perspectives, are important and contribute to their wellbeing and healthy living. Youth-guided CBPR meant involving youth in the process of not only understanding the research process but living through it as well.

  1. Process-based software project management

    CERN Document Server

    Goodman, F Alan

    2006-01-01

    Not connecting software project management (SPM) to actual, real-world development processes can lead to a complete divorcing of SPM to software engineering that can undermine any successful software project. By explaining how a layered process architectural model improves operational efficiency, Process-Based Software Project Management outlines a new method that is more effective than the traditional method when dealing with SPM. With a clear and easy-to-read approach, the book discusses the benefits of an integrated project management-process management connection. The described tight coup

  2. IT Project Prioritization Process

    DEFF Research Database (Denmark)

    Shollo, Arisa; Constantiou, Ioanna

    2013-01-01

    In most of the large companies IT project prioritization process is designed based on principles of evidencebased management. We investigate a case of IT project prioritization in a financial institution, and in particular, how managers practice evidence-based management during this process. We use...... a rich dataset built from a longitudinal study of the prioritization process for the IT projects. Our findings indicate that managers reach a decision not only by using evidence but from the interplay between the evidence and the judgment devices that managers employ. The interplay between evidence...

  3. Customer Involvement in the Game Development Process

    Directory of Open Access Journals (Sweden)

    Kaja Prystupa-Rządca

    2015-01-01

    Full Text Available The creative industry is a fast developing sector of economy in many countries. Growing competition in this area has led many companies to implement strategy of users' involvement in product development in order to deliver products that are more aligned with customers’ needs. On the other hand, the attempt to align the customers’ expectations with artistic creativity may create tensions. Therefore, the aim of the research is to examine the methods of users’ involvement in product development and real impact of the users on project design. The obtained findings are based on two-year qualitative research project conducted in game development companies.

  4. Inclusive Briefing and User Involvement

    DEFF Research Database (Denmark)

    Jensen, Per Anker

    2011-01-01

    Briefing is not just about specifying needs as requirements but also about evaluating how well design proposals fulfil needs and aspirations. Furthermore, briefing is not only about building design. Briefing starts at the preproject stage to create a basis for the project decision and can include...... by top management. The article describes the briefing processes and the methods for user involvement, identifies problem areas and points out possible improvements. The author was actively involved in the project as deputy project director, with responsibility for the briefing process, and is now...... includes a literature study on briefing and user involvement in building projects, and presents a case study of a major building project of a new headquarters and media centre for the Danish Broadcasting Corporation in Copenhagen. The building project was actively used as part of a corporate change process...

  5. Stakeholder involvement in stages of a participatory process illustrated in interior design cases

    DEFF Research Database (Denmark)

    Vink, Peter; van Rhijn, Gu; Seim, Rikke

    2008-01-01

    In a previous study (Vink et al., 2008) an overview was made of the involvement of different stakeholders in a participatory design process. In this paper this overview was used to describe four participatory design cases focused on improvising productivity, health, and comfort by interior design....... It appeared that this overview is useful to describe the involvement in participatory interior design projects. However, it can only serve as an initial benchmark as much is dependent on the specific case at hand....

  6. Integrated project 'fundamental processes of radionuclide migration (FUNMIG)', within EC 6. framework programme

    International Nuclear Information System (INIS)

    Buckau, G.

    2005-01-01

    Full text of publication follows: The FUNMIG project is an integrated project within the 6. Framework Programme of the European Commissions. It started 1 January 2005 and has a duration of 4 years. The project deals with all aspects of radionuclide migration in the far-field of a high level nuclear waste repository. It is structured into seven components. Two components are on fundamental processes applicable to all nuclear waste disposal concepts and host-rock types. They are divided into processes that are conceptually well understood and one component dealing with processes where not only trustworthy data are scarce, but conceptualization is at an infant state. Three components address processes specific for host rock types presently under discussion for high level waste disposal in the EU, namely clay rich, crystalline and salt rock. One component is on integration of processes and abstraction to performance assessment. Finally, one component deals with a broad spectrum of activities on knowledge transfer and training. There are 51 contractors from 15 European countries involved. In addition, a special instrument is used for groups interested in participation as Associated Groups. There are presently about 15 such Associated Groups increasing the number of countries involved to 17. Among these Associated Groups, presently 8 national regulatory bodies are represented, promoting communication between the scientific-technical and regulatory communities. There is no specific deadline for joining the FUNMIG project as an Associated Group and negotiations with further groups/organizations is ongoing. Information about the FUNMIG project can be found under www.funmig.com. The present project is one out of four dealing with disposal of radioactive waste within the European Commissions 6. Framework Programme. The other ones are on the basis for waste disposal techniques, near field processes, and a project expected within the next future dealing with performance

  7. Reengineering the Project Design Process

    Science.gov (United States)

    Casani, E.; Metzger, R.

    1994-01-01

    In response to NASA's goal of working faster, better and cheaper, JPL has developed extensive plans to minimize cost, maximize customer and employee satisfaction, and implement small- and moderate-size missions. These plans include improved management structures and processes, enhanced technical design processes, the incorporation of new technology, and the development of more economical space- and ground-system designs. The Laboratory's new Flight Projects Implementation Office has been chartered to oversee these innovations and the reengineering of JPL's project design process, including establishment of the Project Design Center and the Flight System Testbed. Reengineering at JPL implies a cultural change whereby the character of its design process will change from sequential to concurrent and from hierarchical to parallel. The Project Design Center will support missions offering high science return, design to cost, demonstrations of new technology, and rapid development. Its computer-supported environment will foster high-fidelity project life-cycle development and cost estimating.

  8. From Project Management to Process Management - Effectively Organising Transdisciplinary Projects

    OpenAIRE

    Moschitz, Heidrun

    2013-01-01

    In transdisciplinary projects, the roles of researchers change. In addition to being a source of knowledge, they are required to engage in knowledge exchange processes. This results in an alteration at project level: researchers need to creatively manage projects as group processes.

  9. A process for integrating public involvement into technical/social programs

    International Nuclear Information System (INIS)

    Wiltshire, S.; Williams, C.

    1994-01-01

    Good technical/social decisions--those that are technically sound and publicly acceptable--result from a planning process that considers consulting the public a basic part of the technical program, as basic as hiring a technical consultant to advise about new ideas in computer modeling. This paper describes a specific process for making public involvement an integral part of decision-making about high-level radioactive waste management, so that important technical, social, environmental, economic, and cultural information and values can be incorporated in a meaningful way in planning and carrying out a high-level waste management program or project. The process for integration must consider: (a) the decision or task for which public interaction is needed; (b) the people who should or will want to participate in the decision or task; (c) the goals or purposes of the communication or interaction--the agency's and the public's; (d) the kinds of information the public needs and that the agency needs in order to understand the relevant technical and social issues; and (e) the types of communication or involvement that best serve to meet the agency's and the public's goals

  10. Project Communication in Functions, Process and Project-Oriented Industiral Companies

    Science.gov (United States)

    Samáková, Jana; Koltnerová, Kristína; Rybanský, Rudolf

    2012-12-01

    The article is focused on the project communication management. Industrial enterprises, which use project management must constantly search the new ways for improving. One of the possibilities is the change of management from a functional oriented to the projectoriented or process-oriented. Process-oriented and project-oriented companies have better project communication management during the all project life cycle. Communication in the project is a very important factor. According to the arguments of several authors, one of the biggest problem is that threaten the success of the project is just the communication. In each project is an important pillar - and that is communication. Only on the base of communication can the project move forward and achieve the target.

  11. Collaborative Project: Improving the Representation of Coastal and Estuarine Processes in Earth System Models

    Energy Technology Data Exchange (ETDEWEB)

    Bryan, Frank [Univ. of Washington, Seattle, WA (United States); Dennis, John [Univ. of Washington, Seattle, WA (United States); MacCready, Parker [Univ. of Washington, Seattle, WA (United States); Whitney, Michael [Univ. of Washington, Seattle, WA (United States)

    2016-10-20

    This project aimed to improve long term global climate simulations by resolving and enhancing the representation of the processes involved in the cycling of freshwater through estuaries and coastal regions. This was a collaborative multi-institution project consisting of physical oceanographers, climate model developers, and computational scientists. It specifically targeted the DOE objectives of advancing simulation and predictive capability of climate models through improvements in resolution and physical process representation.

  12. Motivational Influences on Cognition: Task Involvement, Ego Involvement, and Depth of Information Processing.

    Science.gov (United States)

    Graham, Sandra; Golan, Shari

    1991-01-01

    Task involvement and ego involvement were studied in relation to depth of information processing for 126 fifth and sixth graders in 2 experiments. Ego involvement resulted in poorer word recall at deep rather than shallow information processing levels. Implications for the study of motivation are discussed. (SLD)

  13. SNF project engineering process improvement plan

    International Nuclear Information System (INIS)

    KELMENSON, R.L.

    1999-01-01

    This Engineering Process Improvement Plan documents the activities and plans to be taken by the SNF Project (the Project) to support its engineering process and to produce a consolidated set of engineering procedures that are fully compliant with the requirements of HNF-PRO-1819 (1819). These requirements are imposed on all engineering activities performed for the Project and apply to all life-cycle stages of the Project's systems, structures and components (SSCs). This Plan describes the steps that will be taken by the Project during the transition period to ensure that new procedures are effectively integrated into the Project's work process as these procedures are issued. The consolidated procedures will be issued and implemented by September 30, 1999

  14. Implementation of quality improvement techniques for management and technical processes in the ACRV project

    Science.gov (United States)

    Raiman, Laura B.

    1992-12-01

    Total Quality Management (TQM) is a cooperative form of doing business that relies on the talents of everyone in an organization to continually improve quality and productivity, using teams and an assortment of statistical and measurement tools. The objective of the activities described in this paper was to implement effective improvement tools and techniques in order to build work processes which support good management and technical decisions and actions which are crucial to the success of the ACRV project. The objectives were met by applications in both the technical and management areas. The management applications involved initiating focused continuous improvement projects with widespread team membership. The technical applications involved applying proven statistical tools and techniques to the technical issues associated with the ACRV Project. Specific activities related to the objective included working with a support contractor team to improve support processes, examining processes involved in international activities, a series of tutorials presented to the New Initiatives Office and support contractors, a briefing to NIO managers, and work with the NIO Q+ Team. On the technical side, work included analyzing data from the large-scale W.A.T.E.R. test, landing mode trade analyses, and targeting probability calculations. The results of these efforts will help to develop a disciplined, ongoing process for producing fundamental decisions and actions that shape and guide the ACRV organization .

  15. Implementation of quality improvement techniques for management and technical processes in the ACRV project

    Science.gov (United States)

    Raiman, Laura B.

    1992-01-01

    Total Quality Management (TQM) is a cooperative form of doing business that relies on the talents of everyone in an organization to continually improve quality and productivity, using teams and an assortment of statistical and measurement tools. The objective of the activities described in this paper was to implement effective improvement tools and techniques in order to build work processes which support good management and technical decisions and actions which are crucial to the success of the ACRV project. The objectives were met by applications in both the technical and management areas. The management applications involved initiating focused continuous improvement projects with widespread team membership. The technical applications involved applying proven statistical tools and techniques to the technical issues associated with the ACRV Project. Specific activities related to the objective included working with a support contractor team to improve support processes, examining processes involved in international activities, a series of tutorials presented to the New Initiatives Office and support contractors, a briefing to NIO managers, and work with the NIO Q+ Team. On the technical side, work included analyzing data from the large-scale W.A.T.E.R. test, landing mode trade analyses, and targeting probability calculations. The results of these efforts will help to develop a disciplined, ongoing process for producing fundamental decisions and actions that shape and guide the ACRV organization .

  16. Summary of case studies presented at the WPDD topical session on stakeholder involvement in decommissioning projects - november 14, 2005

    International Nuclear Information System (INIS)

    Metcalfe, Doug

    2006-01-01

    Full text of publication follows: Two case studies were presented on experiences with stakeholder involvement in decommissioning projects. The first paper described the development of the United Kingdom Atomic Energy Authority's (UKAEA) stakeholder involvement activities for the Dounreay Nuclear Reactor Test Establishment. The second paper presented the US Nuclear Regulatory Commission regulatory process for decommissioning that includes opportunities for public involvement. The presentation contrasted the stakeholder involvement for two commercial US nuclear power plants (NPPs) that completed decommissioning in 2005, the Trojan NPP and the Maine Yankee NPP. The two case studies highlighted the importance of involving stakeholders in decommissioning projects, and provide important lessons learned. The Dounreay case study demonstrated the UKAEA's determination and commitment to continuously improve its stakeholder engagement program. In 2002, the UKAEA set out to broaden its stakeholder program by improving both public understanding and participation. With regard to public understanding, the UKAEA committed to keep the public informed on decommissioning developments, and ensure that communication was in an understandable form. To improve participation, the UKAEA actively worked to identify and engage stakeholders. The UKAEA then made efforts to involve stakeholders in decision-making activities, including the use of stakeholder panels to discuss and consider options for specific aspects of the Dounreay decommissioning and site restoration plan. In 2004, the UKAEA commissioned an independent review of its stakeholder involvement program to assess the program's effectiveness and benchmark it against best practices. The program was found to be useful, and positive feedback was provided on the use of stakeholder panels and the UKAEA's determination to deliver a broad based and effective stakeholder strategy. Recommendations to UKAEA included involving stakeholders

  17. Summary of Industry-Academia Collaboration Projects on Cluster Ion Beam Process Technology

    International Nuclear Information System (INIS)

    Yamada, Isao; Toyoda, Noriaki; Matsuo, Jiro

    2008-01-01

    Processes employing clusters of ions comprised of a few hundred to many thousand atoms are now being developed into a new field of ion beam technology. Cluster-surface collisions produce important non-linear effects which are being applied to shallow junction formation, to etching and smoothing of semiconductors, metals, and dielectrics, to assisted formation of thin films with nano-scale accuracy, and to other surface modification applications. In 2000, a four year R and D project for development of industrial technology began in Japan under funding from the New Energy and Industrial Technology Development Organization (NEDO). Subjects of the projects are in areas of equipment development, semiconductor surface processing, high accuracy surface processing and high-quality film formation. In 2002, another major cluster ion beam project which emphasized nano-technology applications has started under a contract from the Ministry of Economy and Technology for Industry (METI). This METI project involved development related to size-selected cluster ion beam equipment and processes, and development of GCIB processes for very high rate etching and for zero damage etching of magnetic materials and compound semiconductor materials. This paper describes summery of the results.

  18. Reengineering the project design process

    Science.gov (United States)

    Kane Casani, E.; Metzger, Robert M.

    1995-01-01

    In response to the National Aeronautics and Space Administration's goal of working faster, better, and cheaper, the Jet Propulsion Laboratory (JPL) has developed extensive plans to minimize cost, maximize customer and employee satisfaction, and implement small- and moderate-size missions. These plans include improved management structures and processes, enhanced technical design processes, the incorporation of new technology, and the development of more economical space- and ground-system designs. The Laboratory's new Flight Projects Implementation Development Office has been chartered to oversee these innovations and the reengineering of JPL's project design process, including establishment of the Project Design Center (PDC) and the Flight System Testbed (FST). Reengineering at JPL implies a cultural change whereby the character of the Laboratory's design process will change from sequential to concurrent and from hierarchical to parallel. The Project Design Center will support missions offering high science return, design to cost, demonstrations of new technology, and rapid development. Its computer-supported environment will foster high-fidelity project life-cycle development and more accurate cost estimating. These improvements signal JPL's commitment to meeting the challenges of space exploration in the next century.

  19. LEX Project

    DEFF Research Database (Denmark)

    Damkilde, Lars; Larsen, Torben J.; Walbjørn, Jacob

    This document is aimed at helping all parties involved in the LEX project to get a common understanding of words, process, levels and the overall concept.......This document is aimed at helping all parties involved in the LEX project to get a common understanding of words, process, levels and the overall concept....

  20. Integrating Community into the Classroom: Community Gardening, Community Involvement, and Project-Based Learning.

    Science.gov (United States)

    Langhout, Regina Day; Rappaport, Julian; Simmons, Doretha

    2002-01-01

    Culturally relevant, ongoing project-based learning was facilitated in a predominantly African American urban elementary school via a community garden project. The project involved teachers, students, university members, and community members. This article evaluates the project through two classroom-community collaboration models, noting common…

  1. Partners in projects: preparing for public involvement in health and social care research.

    Science.gov (United States)

    Parkes, Jacqueline H; Pyer, Michelle; Wray, Paula; Taylor, Jane

    2014-09-01

    In recent years, several UK and, international funders of health and social care related research have adopted the policy of requiring explicit evidence of the 'public' voice in all aspects of project design. For many academic researchers engaged within research, evaluations or audit projects, this formal requirement to actively engage members of the public will present them with both benefits and challenges to securing knowledgeable, skilled, and confident lay representation onto project teams. This could potentially lead to the exploitation of those individuals who are available, appropriately informed, and adequately prepared for such activities. Currently, much of the preparation of patients or members of the public for research involvement tends to be aligned to specific projects; however, with the call for greater active and meaningful involvement of lay representatives in future national and international funding applications, there is clearly a growing need to 'train' sufficient numbers of confident and competent representatives to meet this growing demand. This paper describes the development of a specifically designed research awareness training programme and underpinning theoretical model, which has been specifically designed to support active and meaningful lay involvement in research, evaluations and audit projects. Developed over a four year period, the course is a culmination of learning extracted from a series of four completed research projects, which have incorporated an element of public and patient involvement (PPI) training in their overall design. Crown Copyright © 2014. Published by Elsevier Ireland Ltd. All rights reserved.

  2. SNF Project Engineering Process Improvement Plan

    International Nuclear Information System (INIS)

    DESAI, S.P.

    2000-01-01

    This plan documents the SNF Project activities and plans to support its engineering process. It describes five SNF Project Engineering initiatives: new engineering procedures, qualification cards process; configuration management, engineering self assessments, and integrated schedule for engineering activities

  3. User and stakeholder involvement for relevant, reliable and robust local-scale climate projections in Norway

    Science.gov (United States)

    Neby, Simon; Sobolowski, Stefan

    2017-04-01

    How can users and stakeholders be actively involved with providing input to and using output from local-scale climate projections? How can the scientific community better understand the needs of local actors? And how should communication and cooperation efforts be organized? These are critical questions we aim to answer in a climate services project funded by the Norwegian Research Council (R3: Relevant, Reliable and Robust local-scale climate projections for Norway). The project takes into consideration not only the scientific issues in establishing useful local-scale climate projections, but also addresses the "usability gap" between climate information and decision-making. The lack of effective communication between scientists and user communities often result in outputs and products that are not matched with decision-relevant climate information. In the R3 project, the scientific participants actively engage with a range of users that have quite different information needs: municipalities, infrastructure developers, agriculture, energy producers, insurance companies, and more. In this particular presentation, we present our experiences concerning three specific issues that relate to the stakeholder-science interface: 1) Preferences are not clear-cut and pre-defined. In practice, this means that stakeholders often do not have precise information about their needs, nor precise information about how, where and whether their needs can be voiced. Similarly, science communities tend to presuppose that stakeholders are interested and have well-articulated needs, which is hardly the case. Collectively, that means that there is a need for an approach that guides the articulation and prioritization of preferences in a manner that integrates both scientific and stakeholder perspectives and takes the integrity of both perspectives seriously. 2) Technologies are unclear. Although information may be produced and used, past experiences, trial and error processes and pragmatic

  4. Stakeholders and public involvement in river management: heterogeneous acceptance of participatory processes among Swiss institutions.

    Science.gov (United States)

    Buletti, Nora; Utz, Stephan; Ejderyan, Olivier; Graefe, Olivier; Lane, Stuart; Reynard, Emmanuel

    2014-05-01

    This research explores participatory processes in the domain of river management in Switzerland. The main objective is to better understand how participatory processes are incorporated into river management practice. Switzerland being a federal state, river management is a cantonal (regional) responsibility, under the supervision (and co-funding) of the State (a Confederation). The federal funding includes the opportunity to fund additional participatory activities to aid river management, not least because the federal authorities consider the involvement of wider stakeholders and the public in decision-making as a means of aiding the progression of projects. This is a particularly important goal in a Swiss setting where direct democracy (the possibility of calling the decision of any level of government into question through a popular vote) means that a reasonable level of project acceptance is a necessary element of project progression. River management in Switzerland now includes both flood protection and river restoration objectives, which has served to increase its controversy: river corridors contain competing interests with different objectives (e.g. ecological enhancement, protection of agricultural land, flood risk reduction). We were asked by the Confederation to evaluate participatory processes it sponsored and one element of this evaluation aimed to develop a typology of stakeholder participation. We conducted interviews with the 26 cantonal officers in charge of river management. These interviews were based upon thematically structured open ended questions, with the responses analyzed qualitatively. We have identified significant divergence in the implementation of participatory processes between the cantons. These appear to be related to two factors: (1) the canton's historical experience of river management; and (2) the methods used to select stakeholders for inclusion in the decisional process. Cantons that refer to guidelines or pre

  5. Ten Projects to Involve Your Students Directly in French.

    Science.gov (United States)

    van Lent, Peter C.

    1981-01-01

    Proposes 10 activities to provide French classes of all levels with a broad spectrum of language projects involving direct and active use of French including students polling each other, skits based on television commercials, geographical "show and tell," cooking French dishes, writing a monthly newspaper, and field trips. (BK)

  6. Final Report Collaborative Project: Improving the Representation of Coastal and Estuarine Processes in Earth System Models

    Energy Technology Data Exchange (ETDEWEB)

    Bryan, Frank [Univ. of Connecticut, Storrs, CT (United States); Dennis, John [Univ. of Connecticut, Storrs, CT (United States); MacCready, Parker [Univ. of Connecticut, Storrs, CT (United States); Whitney, Michael M. [Univ. of Connecticut, Storrs, CT (United States)

    2016-09-30

    This project aimed to improve long term global climate simulations by resolving and enhancing the representation of the processes involved in the cycling of freshwater through estuaries and coastal regions. This was a collaborative multi-institution project consisting of physical oceanographers, climate model developers, and computational scientists. It specifically targeted the DOE objectives of advancing simulation and predictive capability of climate models through improvements in resolution and physical process representation.

  7. Getting Involved in the IEP Process

    Science.gov (United States)

    Kowalski, Ellen; Lieberman, Lauren J.; Daggett, Sara

    2006-01-01

    Although, in many districts, physical educators are integral members of the Individualized Education Program (designed for students with disabilities such as Down syndrome and autism), in other districts, physical educators are only partially involved in the process or are not given the opportunity to be involved at all. However, the physical…

  8. Improvement of Construction Project Management Processes

    Directory of Open Access Journals (Sweden)

    Nazarko, J.

    2017-07-01

    Full Text Available The common denominator of the five papers published in the current edition of the Journal of Engineering, Project, and Production Management is the improvement of construction project management processes for effective use of resources. Execution of proper project management processes is widely recognized as a key success factor influencing likelihood of project success (Alleman, 2014. It is noticeable that four out of five papers in this issue of the Journal are authored or co-authored by Iranian researchers from the same Institute but their conclusions bear importance that cannot be limited to the authors’ region.

  9. Students in a School Environment: A Project Focused on Family Involvement of At-Risk

    Science.gov (United States)

    Denney, Pat

    2011-01-01

    This project examined family involvement of at risk students in mid-west communities. The purpose of this project was to study the affect of family involvement on at-risk student achievement. The redefining of the perception of America has resulted in a crisis of academic performance in the traditionally slow-changing education systems. This topic…

  10. The Added Value of the Project Selection Process

    Directory of Open Access Journals (Sweden)

    Adel Oueslati

    2016-06-01

    Full Text Available The project selection process comes in the first stage of the overall project management life cycle. It does have a very important impact on organization success. The present paper provides defi nitions of the basic concepts and tools related to the project selection process. It aims to stress the added value of this process for the entire organization success. The mastery of the project selection process is the right way for any organization to ensure that it will do the right project with the right resources at the right time and within the right priorities

  11. Spin versus helicity in processes involving transversity

    CERN Document Server

    Mekhfi, Mustapha

    2011-01-01

    We construct the spin formalism in order to deal in a direct and natural way with processes involving transversity which are now of increasing popularity. The helicity formalism which is more appropriate for collision processes of definite helicity has been so far used also to manage processes with transversity, but at the price of computing numerous helicity amplitudes generally involving unnecessary kinematical variables.In a second step we work out the correspondence between both formalisms and retrieve in another way all results of the helicity formalism but in simpler forms.We then compute certain processes for comparison.A special process:the quark dipole magnetic moment is shown to be exclusively treated within the spin formalism as it is directly related to the transverse spin of the quark inside the baryon.

  12. Innovative Pedagogical Processes Involving Educational Technology

    DEFF Research Database (Denmark)

    Weitze, Charlotte Lærke

    to create motivating learning for the students. This was done by examining the three actors in the educational institution (students, teachers and the surrounding organisation) individually and relationally. The design-based research project developed knowledge in co-design processes with the three actors...

  13. Involving youth with disabilities in the development and evaluation of a new advocacy training: Project TEAM.

    Science.gov (United States)

    Kramer, Jessica; Barth, Yishai; Curtis, Katie; Livingston, Kit; O'Neil, Madeline; Smith, Zach; Vallier, Samantha; Wolfe, Ashley

    2013-04-01

    This paper describes a participatory research process in which six youth with disabilities (Youth Panel) participated in the development and evaluation of a manualized advocacy training, Project TEAM (Teens making Environment and Activity Modifications). Project TEAM teaches youth with disabilities how to identify environmental barriers, generate solutions, and request accommodations. The Youth Panel conducted their evaluation after the university researcher implemented Project TEAM with three groups of trainees. The Youth Panel designed and administered a survey and focus group to evaluate enjoyment and usefulness of Project TEAM with support from an advocate/researcher. Members of the Youth Panel analyzed survey response frequencies. The advocate/researcher conducted a content analysis of the open-ended responses. Sixteen of 21 Project TEAM trainees participated in the evaluation. The evaluation results suggest that the trainees found the interactive and individualized aspects of the Project TEAM most enjoyable and useful. Some instructional materials were difficult for trainees with cognitive disabilities to understand. The Youth Panel's involvement in the development of Project TEAM may explain the relatively positive experiences reported by trainees. Project TEAM should continue to provide trainees with the opportunity to apply concepts in real-life situations. Project TEAM requires revisions to ensure it is enjoyable and useful for youth with a variety of disabilities. • Group process strategies, picture-based data collection materials, peer teamwork, and mentorship from adults with disabilities can enable youth with disabilities to engage in research. • Collaborating with youth with disabilities in the development of new rehabilitation approaches may enhance the relevance of interventions for other youth with disabilities. • Youth with cognitive disabilities participating in advocacy and environment-focused interventions may prefer interactive and

  14. Research Project Evaluation-Learnings from the PATHWAYS Project Experience.

    Science.gov (United States)

    Galas, Aleksander; Pilat, Aleksandra; Leonardi, Matilde; Tobiasz-Adamczyk, Beata

    2018-05-25

    Every research project faces challenges regarding how to achieve its goals in a timely and effective manner. The purpose of this paper is to present a project evaluation methodology gathered during the implementation of the Participation to Healthy Workplaces and Inclusive Strategies in the Work Sector (the EU PATHWAYS Project). The PATHWAYS project involved multiple countries and multi-cultural aspects of re/integrating chronically ill patients into labor markets in different countries. This paper describes key project's evaluation issues including: (1) purposes, (2) advisability, (3) tools, (4) implementation, and (5) possible benefits and presents the advantages of a continuous monitoring. Project evaluation tool to assess structure and resources, process, management and communication, achievements, and outcomes. The project used a mixed evaluation approach and included Strengths (S), Weaknesses (W), Opportunities (O), and Threats (SWOT) analysis. A methodology for longitudinal EU projects' evaluation is described. The evaluation process allowed to highlight strengths and weaknesses and highlighted good coordination and communication between project partners as well as some key issues such as: the need for a shared glossary covering areas investigated by the project, problematic issues related to the involvement of stakeholders from outside the project, and issues with timing. Numerical SWOT analysis showed improvement in project performance over time. The proportion of participating project partners in the evaluation varied from 100% to 83.3%. There is a need for the implementation of a structured evaluation process in multidisciplinary projects involving different stakeholders in diverse socio-environmental and political conditions. Based on the PATHWAYS experience, a clear monitoring methodology is suggested as essential in every multidisciplinary research projects.

  15. Waste Management Process Improvement Project

    International Nuclear Information System (INIS)

    Atwood, J.; Borden, G.; Rangel, G. R.

    2002-01-01

    The Bechtel Hanford-led Environmental Restoration Contractor team's Waste Management Process Improvement Project is working diligently with the U.S. Department of Energy's (DOE) Richland Operations Office to improve the waste management process to meet DOE's need for an efficient, cost-effective program for the management of dangerous, low-level and mixed-low-level waste. Additionally the program must meet all applicable regulatory requirements. The need for improvement was highlighted when a change in the Groundwater/Vadose Zone Integration Project's waste management practices resulted in a larger amount of waste being generated than the waste management organization had been set up to handle

  16. Process of establishing JHP project

    International Nuclear Information System (INIS)

    Ishihara, Masayasu

    2013-01-01

    Institute for Nuclear Study, University of Tokyo was a Japanese central research institute as regards to nuclear physics, high energy physics, and cosmic ray physics. After the foundations of National Laboratory for High Energy Physics, KEK, and Institute for Cosmic Ray Research, University of Tokyo, in early 1970s, the nuclear physics community worked out so-called NUMATRON project, which involved building a large heavy-ion synchrotron. It was, however, not successful in competition with TRISTAN project which was proposed by KEK to build a 30 GeV electron-positron collider. Alternative project of the nuclear physics community was so-called JHP (Japanese Hadron Project), to build 1 GeV proton linac in KEK site in collaboration with KEK, which included that the Institute for Nuclear Study should be consolidated to KEK leaving from The University of Tokyo. The reorganized KEK proposed in collaboration with JAEA, Japan Atomic Energy Agency, to build a big proton accelerator facility in JAEA site. This plan was realized as J-PARC, Japanese Proton Accelerator Research Complex, operating 50 GeV proton synchrotron. (author)

  17. Prioritising Project Scope Definition Elements in Public Building Projects

    Directory of Open Access Journals (Sweden)

    Mohammed K Fageha

    2014-09-01

    Full Text Available A complete definition of the scope of a project upfront during early stages ensures smooth and successful implementation during the project execution. This research identifies and prioritises project scope definition elements for public buildings in Saudi Arabia. Elements that could significantly contribute to complete project scope definition package at pre-project planning stage are identified and their interrelationship determined and prioritised. Using the Project Definition Rating Index (PDRI as a basis, the study uses analytical network process (ANP technique based on data obtained from project managers who have been involved in public sector projects in Saudi Arabia. Data collection and analysis was conducted in three steps. The first step involved identification of scope definition elements while the second involved an investigation into interrelationships among the elements. In the third step, ANP was used to determine the weight of the elements’ importance in terms of contribution to project scope definition completeness. Finally, Pareto analysis was used to prioritise and assess the distribution pattern of the elements. The outcome from this research is the prioritisation of project scope definition elements for public building projects in Saudi Arabia. The prioritised list developed indicates the importance of project scope definition elements. It should help project management teams identify elements to consider when evaluating project scope definition for completeness at the pre-project planning stage. Keywords: Project scope definition, pre-project planning, prioritising, public building projects, Saudi Arabia, Analytical Network Process (ANP

  18. Factors Influencing the Private Involvement in Urban Rail Public-Private Partnership Projects in China

    Directory of Open Access Journals (Sweden)

    Yongjian Ke

    2017-03-01

    Full Text Available Private investors have been encouraged to participate in the development and operation of urban rail projects in China through Public-Private Partnerships (PPPs, given the fact that subnational governments are suffering from urgent development demands and severe fiscal pressure. However, there is no formal assessment to determine the private involvement in a PPP project. This problem is particularly critical in the sector of urban rail, in which the huge investment cannot rely on the private sector alone. This study hence aimed to uncover and identify the influencing factors. Multiple research methods, including content analysis, case study and focus group discussion were adopted to achieve the research purpose. Seven types of influencing factors were identified, including project financial model, government fiscal commitment, risk allocation, public accountability, efficiency considerations, policy and regulations, and organisational marketing strategies. The findings add to the current knowledge base by uncovering the drivers behind private involvement in a PPP project. They are also beneficial for industry practitioners as a basis/checklist to determine the private involvement.

  19. Research Project Evaluation—Learnings from the PATHWAYS Project Experience

    Directory of Open Access Journals (Sweden)

    Aleksander Galas

    2018-05-01

    Full Text Available Background: Every research project faces challenges regarding how to achieve its goals in a timely and effective manner. The purpose of this paper is to present a project evaluation methodology gathered during the implementation of the Participation to Healthy Workplaces and Inclusive Strategies in the Work Sector (the EU PATHWAYS Project. The PATHWAYS project involved multiple countries and multi-cultural aspects of re/integrating chronically ill patients into labor markets in different countries. This paper describes key project’s evaluation issues including: (1 purposes, (2 advisability, (3 tools, (4 implementation, and (5 possible benefits and presents the advantages of a continuous monitoring. Methods: Project evaluation tool to assess structure and resources, process, management and communication, achievements, and outcomes. The project used a mixed evaluation approach and included Strengths (S, Weaknesses (W, Opportunities (O, and Threats (SWOT analysis. Results: A methodology for longitudinal EU projects’ evaluation is described. The evaluation process allowed to highlight strengths and weaknesses and highlighted good coordination and communication between project partners as well as some key issues such as: the need for a shared glossary covering areas investigated by the project, problematic issues related to the involvement of stakeholders from outside the project, and issues with timing. Numerical SWOT analysis showed improvement in project performance over time. The proportion of participating project partners in the evaluation varied from 100% to 83.3%. Conclusions: There is a need for the implementation of a structured evaluation process in multidisciplinary projects involving different stakeholders in diverse socio-environmental and political conditions. Based on the PATHWAYS experience, a clear monitoring methodology is suggested as essential in every multidisciplinary research projects.

  20. CALDERON COKEMAKING PROCESS/DEMONSTRATION PROJECT

    International Nuclear Information System (INIS)

    Albert Calderon

    1998-01-01

    This project deals with the demonstration of a coking process using proprietary technology of Calderon, with the following objectives geared to facilitate commercialization: (1) making coke of such quality as to be suitable for use in hard-driving, large blast furnaces; (2) providing proof that such process is continuous and environmentally closed to prevent emissions; (3) demonstrating that high-coking-pressure (non-traditional) coal blends which cannot be safely charged into conventional by-product coke ovens can be used in the Calderon process; and (4) demonstrating that coke can be produced economically, at a level competitive with coke imports. The activities of the past quarter were focused on the following: Conducting bench-scale tests to produce coke and acceptable tar from the process to satisfy Koppers, a prospective stakeholder; Consolidation of the project team players to execute the full size commercial cokemaking reactor demonstration; and Progress made in advancing the design of the full size commercial cokemaking reactor

  1. CALDERON COKEMAKING PROCESS/DEMONSTRATION PROJECT

    International Nuclear Information System (INIS)

    Albert Calderon

    1999-01-01

    This project deals with the demonstration of a coking process using proprietary technology of Calderon, with the following objectives geared to facilitate commercialization: (1) making coke of such quality as to be suitable for use in hard-driving, large blast furnaces; (2) providing proof that such process is continuous and environmentally closed to prevent emissions; (3) demonstrating that high-coking-pressure (non-traditional) coal blends which cannot be safely charged into conventional by-product coke ovens can be used in the Calderon process; and (4) demonstrating that coke can be produced economically, at a level competitive with coke imports. The activities of the past quarter were focused on the following: Consolidation of the team of stakeholders; Move the site for the commercial demonstration to LTV Steel, Cleveland, Ohio; Permitting for new site; Site specific engineering; Cost update of the project as it relates to the Cleveland location; FETC update; DCAA audit; and Updated endorsement of Calderon process by Ohio EPA and U.S. EPA, Region 5

  2. Itataia project - Development of the process

    International Nuclear Information System (INIS)

    Coelho, S.V.

    1987-01-01

    A process for treating the phosphorus uraniferous ore, from Itataia-CE mine in Brazil, was developed, establishing the basic flow chart for recovery two products: uranium concentrate and phosphoric acid. The developed process consists in physical concentration, chemical separation, solvent extraction, and it presented, in laboratory and pilot scales, recovery levels which assure the project viability technicaly and economicaly. The consolidation of project and the description of installations are presented by a documentary film. (M.C.K.) [pt

  3. Itataia project - Development of the process

    International Nuclear Information System (INIS)

    Coelho, S.V.

    1987-01-01

    A process for treating the phosphorous uraniferous ore, from Itataia-CE mine in Brazil, was developed, establishing the basic flow chart for recovery two products: uranium concentrate and phosphoric acid. The developed process consists in physical concentration, chemical separation, solvent extraction, and it presented, in laboratory and pilot scales, recovery leves which assure the project viability technically and economically. The consolidation of project and the description of installations are presented by a documentary film. (M.C.K.) [pt

  4. Involvement of Individuals in the Development of Technical Solutions and Rules of Management for Building Renovation Projects: A Case Study of Latvia

    Science.gov (United States)

    Pukite, I.; Grekis, A.; Geipele, I.; Zeltins, N.

    2017-08-01

    In March 2016, the Latvian government approved a new support program for increasing energy efficiency in residential apartment buildings. For the support of renovation of apartment buildings in the period from 2016 to 2023, 166 470 588 EUR will be available. Different persons, such as energy auditors, designers, architects, project managers and builders, will be involved in the process of planning, development and implementation of building renovation. At the development stage of the building renovation project, special attention should be devoted to the first stage - energy audit and technical project development. The problem arises due to the fact that each of these individuals, during the development of technical building documentation, does not work as a completely unified system. The implementation of construction project planning and organisational management system is one of the most important factors to guarantee that the quality of building renovation project is ensured in accordance with the laws and regulatory standards. The paper studies mutual cooperation, professionalism and the role of information feedback of personnel involved in the planning stage of building renovation, which is an essential prerequisite for the renovation process in order to achieve high quality of work and reduce the energy performance indicator. The present research includes the analysis of different technical solutions and their impact on energy efficiency. Mutual harmonisation of technical specifications is also investigated.

  5. A successful effort to involve stakeholders in a facility siting decision using LIPS with stakeholder involvement

    International Nuclear Information System (INIS)

    Merkhofer, L.; Conway, R.; Anderson, B.

    1995-01-01

    Local public opposition to federal bureaucratic decisions has resulted in public agencies rethinking the role of stakeholders in decision making. Efforts to include stakeholders directly in the decision-making process are on the increase. Unfortunately, many attempts to involve members of the public in decisions involving complex technical issues have failed. A key problem has been defining a meaningful role for the public in the process of arriving at a technical decision. This paper describes a successful effort by Sandia National Laboratories (SNL) in New Mexico to involve stakeholders in an important technical decision associated with its Environmental Restoration (ER) Project. The decision was where to locate a Corrective Action Management Unit (CAMU), a facility intended to consolidate and store wastes generated from the cleanup of hazardous waste sites. A formal priority setting process known as the Laboratory Integration Prioritization System (LIPS) was adapted to provide an approach for involving the public. Although rarely applied to stakeholder participation, the LIPS process proved surprisingly effective. It produced a consensus over a selected site and enhanced public trust and understanding of Project activities

  6. Determination of risk identification process employed by NHS for a PFI hospital project in the UK

    Directory of Open Access Journals (Sweden)

    F. E. Mohamed Ghazali

    2009-12-01

    Full Text Available Long-term concession contracts associated with Private Finance Initiative (PFI projects, such as National Health Service (NHS hospitals, are subject to substantial risks, which may not only emerge from project activities such as design and construction, but also from global issues beyond the control of project parties, such as commercial, legal and political risks. Therefore, the principal parties involved must manage risks effectively and efficiently, as early as the project initiation stage, in order to ensure a successful delivery. The aim of this paper is to examine the risk identification process of the NHS PFI hospital in the UK, as a case study, in order to determine the techniques used in risk identification, and their significance, based on estimated probabilities of occurrence. These objectives were achieved through interviews with key personnel within the NHS Trust involved. Results found the sole technique used in risk identification to be brainstorming, through which more than thirty risks were identified and classified under six risk categories: planning, pre-commissioning, design, land purchasing, construction and operation. Thirteen risks were identified as significant based on their estimated probability of occurrence had the project been developed via public procurement. The results of this research will enable public sector clients like the NHS Trust to not only identify the significant risks, which will allow them to focus more attention on developing appropriate mitigation strategies and contingency plans, but also to improve its risk identification process through the use of other techniques in order to support findings from the brainstorming process.

  7. Calderon cokemaking process/demonstration project

    International Nuclear Information System (INIS)

    Albert Calderon

    1998-01-01

    This project deals with the demonstration of a coking process using proprietary technology of Calderon, with the following objectives geared to facilitate commercialization: (i) making coke of such quality as to be suitable for use in hard-driving, large blast furnaces; (ii) providing proof that such process is continuous and environmentally closed to prevent emissions; (iii) demonstrating that high-coking-pressure (non-traditional) coal blends which cannot be safely charged into conventional by-product coke ovens can be used in the Calderon process; and (iv) demonstrating that coke can be produced economically, at a level competitive with coke imports. The activities of the past quarter were focused on the following: Consolidation of the project team-players; Recruiting Koppers Industries as an additional stakeholder; Developing a closed system for the production of binder pitch from tar in the Calderon coking process as the incentive for Koppers to join the team; Gathering appropriate equipment for conducting a set of experiments at bench scale to simulate tar quality produced from the Calderon coking process for the production of binder pitch; and Further progress made in the design of the commercial coking reactor

  8. A proposed selection process in Over-The-Top project portfolio management

    Directory of Open Access Journals (Sweden)

    Jemy Vestius Confido

    2018-05-01

    Full Text Available Purpose: The purpose of this paper is to propose an Over-The-Top (OTT initiative selection process for communication service providers (CSPs entering an OTT business. Design/methodology/approach: To achieve this objective, a literature review was conducted to comprehend the past and current practices of the project (or initiative selection process as mainly suggested in project portfolio management (PPM. This literature was compared with specific situations and the needs of CSPs when constructing an OTT portfolio. Based on the contrast between the conventional project selection process and specific OTT characteristics, a different selection process is developed and tested using group model-building (GMB, which involved an in-depth interview, a questionnaire and a focus group discussion (FGD. Findings: The paper recommends five distinct steps for CSPs to construct an OTT initiative portfolio: candidate list of OTT initiatives, interdependency diagram, evaluation of all interdependent OTT initiatives, evaluation of all non-interdependent OTT initiatives and optimal portfolio of OTT initiatives. Research limitations/implications: The research is empirical, and various OTT services are implemented; the conclusion is derived only from one CSP, which operates as a group. Generalization of this approach will require further empirical tests on different CSPs, OTT players or any firms performing portfolio selection with a degree of interdependency among the projects. Practical implications: Having considered interdependency, the proposed OTT initiative selection steps can be further implemented by portfolio managers for more effective OTT initiative portfolio construction. Originality/value: While the previous literature and common practices suggest ensuring the benefits (mainly financial of individual projects, this research accords higher priority to the success of the overall OTT initiative portfolio and recommends that an evaluation of the overall

  9. Licensing Process for International Projects

    International Nuclear Information System (INIS)

    Raetzke, Christan

    2014-01-01

    Christan Raetzke, lawyer, then outlined why nuclear constructions were always international projects and in which cases it would make sense to also make the licensing process be international. His law consulting firm CONLAR focuses specifically on design review so he could adequately present why an international process would make a lot of sense without being a loss of sovereignty

  10. Plasma hearth process demonstration project

    International Nuclear Information System (INIS)

    Geimer, R.M.; Gillins, R.L.

    1995-01-01

    The Plasma Hearth Process (PHP) demonstration project is one of the key technology projects in the US Department of Energy (DOE) Office of Technology Development Mixed Waste Focus Area. The PHP is a high temperature thermal treatment process using a plasma arc torch in a stationary, refractory lined chamber that destroys organics and stabilizes the residuals in a nonleaching, vitrified waste form, greatly improving the disposability of the waste. This paper describes the PHP system and summarizes test results to date, including volume reduction, destruction and removal efficiencies for organic wastes, and emission characteristics. Tests performed so far demonstrate that the PHP adresses DOE mixed waste final waste form requirements and US Environmental Protection Agency Toxicity Characteristic Leaching Procedure requirements

  11. The use of process mapping in healthcare quality improvement projects.

    Science.gov (United States)

    Antonacci, Grazia; Reed, Julie E; Lennox, Laura; Barlow, James

    2018-05-01

    Introduction Process mapping provides insight into systems and processes in which improvement interventions are introduced and is seen as useful in healthcare quality improvement projects. There is little empirical evidence on the use of process mapping in healthcare practice. This study advances understanding of the benefits and success factors of process mapping within quality improvement projects. Methods Eight quality improvement projects were purposively selected from different healthcare settings within the UK's National Health Service. Data were gathered from multiple data-sources, including interviews exploring participants' experience of using process mapping in their projects and perceptions of benefits and challenges related to its use. These were analysed using inductive analysis. Results Eight key benefits related to process mapping use were reported by participants (gathering a shared understanding of the reality; identifying improvement opportunities; engaging stakeholders in the project; defining project's objectives; monitoring project progress; learning; increased empathy; simplicity of the method) and five factors related to successful process mapping exercises (simple and appropriate visual representation, information gathered from multiple stakeholders, facilitator's experience and soft skills, basic training, iterative use of process mapping throughout the project). Conclusions Findings highlight benefits and versatility of process mapping and provide practical suggestions to improve its use in practice.

  12. DHA involvement in neurotransmission process

    Directory of Open Access Journals (Sweden)

    Vancassel Sylvie

    2007-05-01

    Full Text Available The very high enrichment of the nervous system in the polyunsaturated fatty acids, arachidonic (AA, 20: 4n-6 and docosahexaenoic acids (DHA, 22: 6n-3, is dependant of the dietary availability of their respective precursors, linoleic (18: 2n-6 and_-linolenic acids (18: 3n-3. Inadequate amounts of DHA in brain membranes have been linked to a wide variety of abnormalities ranging from visual acuity and learning irregularities, to psychopathologies. However, the molecular mechanisms involved remain unknown. Several years ago, we hypothesized that a modification of DHA contents of neuronal membranes by dietary modulation could change the neurotransmission function and then underlie inappropriate behavioural response. We showed that, in parallel to a severe loss of brain DHA concomitant to a compensatory substitution by 22:5n-6, the dietary lack of α-linolenic acid during development induced important changes in the release of neurotransmitters (dopamine, serotonin, acetylcholine in cerebral areas specifically involved in learning, memory and reward processes. Data suggested alteration of presynaptic storage process and dysregulations of reciprocal functional interactions between monoaminergic and cholinergic pathways. Moreover, we showed that recovery of these neurochemical changes was possible when the deficient diet was switched to a diet balanced in n-3 and n-6 PUFA before weaning. The next step is to understand the mechanism involved. Particularly, we focus on the study of the metabolic cooperation between the endothelial cell, the astrocyte and the neuron which regulate synaptic transmission.These works could contribute to the understanding of the link between some neuropsychiatric disorders and the metabolism of n-3 PUFA, through their action on neurotransmission.

  13. THE SYSTEM OF PROCESSES AND PROJECTS OF THE AIRCRAFT AIRWORTHINESS MAINTENANCE

    Directory of Open Access Journals (Sweden)

    Alexander A. Itskovich

    2018-01-01

    Full Text Available The concept of the aviation enterprise as a unified system of processes and projects of the aircraft airworthiness maintenance (AAM is presented. The relevance of project management tools usage, including the transport branch, is noted; the examples of successful implementation of the development projects at domestic enterprises manufacturing aircraft engines are given. A scheme for the classification of the AAM projects and processes, reflecting their interrelationship, is proposed. The operational activity of the enterprise is a combination of its business processes. The company selects plans and implements the relevant projects for the business processes optimization. At the same time, the projects themselves are the objects of management based on standardized processes. The processes of project management and the main processes of the enterprise are also interrelated and can be objects included in the unified regulations of its units. Increasing the efficiency of operational processes and processes of the aviation enterprise management is the goal of development projects, which are divided into investment projects and organizational changes projects.Limitation of organizational and financial resources of the company requires the identification and systematization of all projects and processes, while the application of project management standards allows to analyze the opportunities and to determine the sequence of their implementation. The importance of accumulating experience of completed projects is shown; the results can become typical methods for planning, organizing the implementation and monitoring of AAM projects. Specific forms of the project management standards implementation for AN-124-100 constructive modification project in LLC Volga-Dnepr Airlines are demonstrated: the control events plan and the project team formation.

  14. A Project in Thermal Physics Involving a Car Parked in Direct Sunlight

    Science.gov (United States)

    Lee, Wei; Gilley, Heidi L.; Caris, Joshua B.

    1997-05-01

    A research project for introductory physics students, involving an estimate of the surface temperature of the Sun using a parked car, was carried out in the Summer 1995 Research Apprenticeships in Science Program, sponsored by Edison Industrial Systems Center, for local-area high school students. This activity entails both outdoor quantitative observations and theoretical analysis, and yields a result within 12 percent of the accepted value. It was demonstrated that the use of everyday materials and outdoor observations, such as those in this project, is not only educational but also intriguing. The success of this experiment as a summer research project will be discussed.

  15. Decision process involved in preparing the Shippingport reactor pressure vessel for transport

    International Nuclear Information System (INIS)

    Murphie, W.E.

    1989-01-01

    The most significant part of the Shippingport Station Decommissioning Project was the one-piece removal and shipment of the reactor pressure vessel (RPV). Implicit in the RPV transport was the task of qualifying the RPV as a waste package acceptable for shipment. Soon after physical decommissioning began on September 1985, questions regarding the packaging certification and transport of the RPV from Shippingport, Pennsylvania to the US Department of Energy (DOE) Hanford Waste Burial Site necessitated reexamination of several planning assumptions. A complete reassessment of the regulatory requirements governing the RPV shipment resulted in a programmatic decision to obtain a type B(U) Certificate of Compliance and abandon the originally planned US Department of Transportation (DOT) low specific activity (LSA) shipment. The decision process resulting in this conclusion was extensive and involved many organizations and agencies. Incidental to this process, several subtle certification issues were identified that required resolution. Some of these issues involved the definition of LSA material for large packages; interpretation and compliance with DOE, DOT and US Nuclear Regulatory Commission (NRC) regulations for the transport of radioactive material; incorporation of the International Atomic Energy Agency (IAEA) regulations by the Panama Canal; and DOE policy requiring advance notification to states of radioactive waste shipments. 2 figs

  16. Decision process involved in preparing the Shippingport reactor pressure vessel for transport

    International Nuclear Information System (INIS)

    Murphie, W.E.

    1990-01-01

    The most significant part of the Shippingport Station Decommissioning Project was the one-piece removal and shipment of the reactor pressure vessel (RPV). Implicit in the RPV transport was the task of qualifying the RPV as a waste package acceptable for shipment. Soon after physical decommissioning began on September, 1985, questions regarding the packaging certification and transport of the RPV from Shippingport, Pennsylvania to the U.S. Department of Energy (DOE) Hanford waste burial site necessitated reexamination of several planning assumptions. A complete reassessment of the regulatory requirements governing the RPV shipment resulting in a programmatic decision to obtain a Type B(U) Certification of Compliance and abandon the originally planned U.S. Department of Transportation (DOT) low specific activity (LSA) shipment. The decision process resulting in this conclusion was extensive and involved many organizations and agencies. Incidental to this process, several subtle certification issues were identified that required resolution. Some of these issues involved the definition of LSA material for large packages; interpretation and compliance with DOE, DOT and U.S. Nuclear Regulatory Commission (NRC) regulations for the transport of radioactive material; incorporation of the International Atomic Energy Agency (IAEA) regulations by the Panama Canal; and DOE policy requiring advance notification to states of radioactive waste shipments

  17. Stakeholder involvement activities in Slovakia. NRA's Commitment to Transparent Regulatory Process. Stakeholder Involvement in the French Regulatory Process - From Public Information to Public Participation. Stakeholder involvement in nuclear decision making in the Russian Federation

    International Nuclear Information System (INIS)

    Ziakova, Marta Chairperson; Nuclear Regulatory Authority of the Slovak Republic; Nuclear Regulation Authority - NRA; Ferapontov, Alexey

    2017-01-01

    Session 2 focused on the regulatory perspectives related to stakeholder involvement in the regulatory decision-making process. Presentations provided the audience with information regarding the international and national legal framework implemented in the Slovak Republic, in France, in Japan and in Russia. Examples of stakeholder involvement, as well as some tools used for this purpose, were presented and discussed. The value of consistency and complementarity between international and national requirements was highlighted. Presentations and discussion confirmed the very close tie between the way the stakeholder involvement process is conducted and the public confidence and perception of reliability the regulatory body may gain, or lose. The four presentations confirmed that stakeholder involvement is a key challenge for maintaining regulatory body credibility, independence and legitimacy. All countries confirmed their commitment to trying to make their stakeholder involvement processes as open, visible, transparent and comprehensive as possible. Involvement represents a long and permanent process which requires investment of time, human resources and money, as well as the ability to reach out, to listen, to share, and to take input into account, while keeping in view the goal of delivering decisions that are as rational and objective as possible. Involving stakeholders is more than informing or communicating. The earlier the stakeholders are involved in the decision-making process, the greater the chance of success. If losing credibility is easy, all regulatory bodies agreed on the long process needed to recover it

  18. The impact of consumer involvement in research: an evaluation of consumer involvement in the London Primary Care Studies Programme.

    Science.gov (United States)

    Wyatt, Katrina; Carter, Mary; Mahtani, Vinita; Barnard, Angela; Hawton, Annie; Britten, Nicky

    2008-06-01

    The value of consumer involvement in health services research is widely recognized. While there is a growing body of evidence about the principles of good consumer involvement, there is little research about the effect that involvement can have on the research. This evaluation assessed the level and impact of consumer involvement in the London Primary Care Studies Programme (LPCSP), all of whose individual projects had to demonstrate substantial involvement as a condition of funding. To evaluate consumer involvement in the LPSCP and understand what impact consumers had on the research process and outcomes. A multi-method case study approach was undertaken, using survey techniques, interviews, focus groups, observation and scrutiny of written documents. The overall data set comprised 61 questionnaires, 44 semi-structured interviews, 2 focus groups and 15 hours of observation of meetings. Eleven primary care-based research projects which together made up the LPCSP. An in-depth description of consumer involvement in the Programme was produced. Nine projects had consumers as co-applicants, four projects had been completed before the evaluation began and one was still ongoing at the time of the evaluation. Of the eight projects which have produced final reports, all met their aims and objectives. Consumers had had an additional impact in the research, in the initial design of the study, in recruitment of the research subjects, in developing data collection tools, in collecting the data, in analysis and disseminating the findings. Consumer involvement in National Health Service research is a relatively recent policy development and while there is an increasing amount of literature about how and why consumers should be involved in research, there is less evidence about the impact of such involvement. This evaluation provides evidence about the impact that consumers have not only on the research process but also on the outcomes of the research.

  19. Involving the stakeholders in the curriculum process: a recipe for success?

    Science.gov (United States)

    Keogh, Johannes J; Fourie, Willem J; Watson, Sheona; Gay, H

    2010-01-01

    The Department of Nursing and Health Studies at the Manukau Institute of Technology (MIT) in Auckland, New Zealand, decided to involve stakeholders from the health care sector in developing a new curriculum. After implementing the new curriculum, the process was evaluated using a content analysis as qualitative research design. Seven individual interviews and one Focus group interview were conducted with the stakeholders to determine their experiences during the process. Ethical permission was sought from the MIT ethical committee. The analyses of the collected data enabled the researchers to identify six main categories. The categories were: "Existing Programme", "The need to change", "The curriculum development process", "The stakeholders", "Personnel", and "Ethnic minorities". From the collected data, it was clear that a new curriculum was necessary to enable the graduates to meet the health care needs of the New Zealand population, especially after the primary health care policy was introduced in New Zealand. It was also clear that the curriculum development process could be a painful process for all concerned, but a strong leadership could cement a feeling of "collegiality" between stakeholders and teaching staff. The importance of considering the rights of ethnic minorities is clearly stated in the Treaty of Waitangi, safeguarding the rights of the Maori People, and therefore applied rigorously in the development process. In this project, the collaborative process was very successful, and the stakeholders actually expressed feelings of "Ownership" of the curriculum.

  20. A functional-dynamic reflection on participatory processes in modeling projects.

    Science.gov (United States)

    Seidl, Roman

    2015-12-01

    The participation of nonscientists in modeling projects/studies is increasingly employed to fulfill different functions. However, it is not well investigated if and how explicitly these functions and the dynamics of a participatory process are reflected by modeling projects in particular. In this review study, I explore participatory modeling projects from a functional-dynamic process perspective. The main differences among projects relate to the functions of participation-most often, more than one per project can be identified, along with the degree of explicit reflection (i.e., awareness and anticipation) on the dynamic process perspective. Moreover, two main approaches are revealed: participatory modeling covering diverse approaches and companion modeling. It becomes apparent that the degree of reflection on the participatory process itself is not always explicit and perfectly visible in the descriptions of the modeling projects. Thus, the use of common protocols or templates is discussed to facilitate project planning, as well as the publication of project results. A generic template may help, not in providing details of a project or model development, but in explicitly reflecting on the participatory process. It can serve to systematize the particular project's approach to stakeholder collaboration, and thus quality management.

  1. Democratizing Process Innovation? On Citizen Involvement in Public Sector BPM

    Science.gov (United States)

    Niehaves, Björn; Malsch, Robert

    ‘Open Innovation’ has been heavily discussed for product innovations; however, an information systems (IS) perspective on ‘process innovation’ has not yet been taken. Analyzing the example of the public sector in Germany, the paper seeks to investigate the factors that hinder and support ‘open process innovation’, a concept we define as the involvement of citizens in business process management (BPM) activities. With the help of a quantitative study (n=358), six factors are examined for their impact on citizen involvement in local government BPM initiatives. The results show that citizen involvement in reform processes is not primarily motivated by the aim of cost reduction, but rather related to legitimacy reasons and the intent to increase employee motivation. Based on these findings, implications for (design) theory and practice are discussed: Instead of detailed collaborative business processes modeling, the key of citizen involvement in public sector BPM lies in communication and mutual understanding.

  2. Camera calibration based on the back projection process

    Science.gov (United States)

    Gu, Feifei; Zhao, Hong; Ma, Yueyang; Bu, Penghui

    2015-12-01

    Camera calibration plays a crucial role in 3D measurement tasks of machine vision. In typical calibration processes, camera parameters are iteratively optimized in the forward imaging process (FIP). However, the results can only guarantee the minimum of 2D projection errors on the image plane, but not the minimum of 3D reconstruction errors. In this paper, we propose a universal method for camera calibration, which uses the back projection process (BPP). In our method, a forward projection model is used to obtain initial intrinsic and extrinsic parameters with a popular planar checkerboard pattern. Then, the extracted image points are projected back into 3D space and compared with the ideal point coordinates. Finally, the estimation of the camera parameters is refined by a non-linear function minimization process. The proposed method can obtain a more accurate calibration result, which is more physically useful. Simulation and practical data are given to demonstrate the accuracy of the proposed method.

  3. Analysis of architect’s performance indicators in project delivery process

    Science.gov (United States)

    Marisa, A.

    2018-03-01

    Architect as a professional in the construction industry should possess a good performance in project delivery process. As a design professional, architect has an important role to ensure that the process is well-conducted by delivering a high-quality product for the clients. Thus, analyzing architect’s performance indicators is crucial in the project delivery process. This study aims to analyze the relative importance of architect performance indicators in project delivery process among registered architects in North Sumatera, Indonesia. A total of five indicators that measure architect performance in project delivery process were identified and 110 completed questionnaires were obtained and used for data analysis. A relative importance index is used to rank the relative importance of architect performance indicators. Results indicate that focus on the clients is the most important indicator of architect performance in project delivery process. This study demonstrates project communication as one of crucial indicators perceived by the architects for measuring their performance, and fills a knowledge gap on the importance of identifying the most important indicator for measuring architect performance from their own perspectives which previous studies have overlooked to improve performance assessment in project delivery process.

  4. A process model for design team communication within fast-track building projects using project websites

    NARCIS (Netherlands)

    Otter, den A.F.H.J.; Reymen, I.M.M.J.

    2008-01-01

    The factor time within building projects is on high pressure because of the increasing need for faster delivery of buildings. Within fast track, complex building projects the design process is an important key. Through case analyses offart-hack design processes it became obvious that process and

  5. Process-based project proposal risk management

    Directory of Open Access Journals (Sweden)

    Alok Kumar

    2016-12-01

    Full Text Available We all are aware of the organizational omnipresence. Projects within the organizations are ubiquitous too. Projects achieve their goals successfully if they are planned, scheduled, controlled and implemented well. The project lifecycle of initiating, planning, scheduling, controlling and implementing are very well-planned by project managers and the organizations. Successful projects have well-developed risk management plans to deal with situations impacting projects. Like any other organisation, a university does try to access funds for different purposes too. For such organisations, running a project is not the issue, rather getting a project proposal approved to fund a project is the key. Project proposal processing is done by the nodal office in every organisation. Usually, these nodal offices help in administration and submission of a project proposal for accessing funds. Seldom are these nodal project offices within the organizations facilitate a project proposal approval by proactively reaching out to the project managers. And as project managers prepare project proposals, little or no attention is made to prepare a project proposal risk plan so as to maximise project acquisition. Risk plans are submitted while preparing proposals but these risk plans cater to a requirement to address actual projects upon approval. Hence, a risk management plan for project proposal is either missing or very little effort is made to treat the risks inherent in project acquisition. This paper is an integral attempt to highlight the importance of risk treatment for project proposal stage as an extremely important step to preparing the risk management plan made for projects corresponding to their lifecycle phases. Several tools and techniques have been proposed in the paper to help and guide either the project owner (proposer or the main organisational unit responsible for project management. Development of tools and techniques to further enhance project

  6. Salutogenic service user involvement in nursing research: a case study.

    Science.gov (United States)

    Mjøsund, Nina Helen; Vinje, Hege Forbech; Eriksson, Monica; Haaland-Øverby, Mette; Jensen, Sven Liang; Kjus, Solveig; Norheim, Irene; Portaasen, Inger-Lill; Espnes, Geir Arild

    2018-05-12

    The aim was to explore the process of involving mental healthcare service users in a mental health promotion research project as research advisors and to articulate features of the collaboration which encouraged and empowered the advisors to make significant contributions to the research process and outcome. There is an increasing interest in evaluating aspects of service user involvement in nursing research. Few descriptions exist of features that enable meaningful service user involvement. We draw on experiences from conducting research which used the methodology interpretative phenomenological analysis to explore how persons with mental disorders perceived mental health. Aside from the participants in the project, five research advisors with service user experience were involved in the entire research process. We applied a case study design to explore the ongoing processes of service user involvement. Documents and texts produced while conducting the project (2012-2016), as well as transcripts from multistage focus group discussions with the research advisors, were analysed. The level of involvement was dynamic and varied throughout the different stages of the research process. Six features: leadership, meeting structure, role clarification, being members of a team, a focus on possibilities and being seen and treated as holistic individuals, were guiding principles for a salutogenic service user involvement. These features strengthened the advisors' perception of themselves as valuable and competent contributors. Significant contributions from research advisors were promoted by facilitating the process of involvement. A supporting structure and atmosphere were consistent with a salutogenic service user involvement. This article is protected by copyright. All rights reserved. This article is protected by copyright. All rights reserved.

  7. Public Values and Stakeholder Involvement - A new framework for Performance Assessment? The European Project RISCOM-II. Work Package 1

    Energy Technology Data Exchange (ETDEWEB)

    Andersson, Kjell [Karinta-Konsult, Taeby (Sweden); Chataignier, Stephane [Electricite de France (France); Drottz-Sjoeberg, Britt-Marie [BMD Research (Sweden)] [and others

    2002-11-01

    RISCOM-II is a project within the fifth framework programme of the European Commission. It is based on a widely recognised need for more transparent decision processes in nuclear waste management. The objective of the RISCOM-II project is to share the knowledge of the context of radioactive waste management in various European countries and to see to what extent it is possible to apply more widely the RISCOM Model in order to improve the acceptability of radioactive waste management. Thus, the project aims to promote the development of processes involving transparency, as well as means involving greater participation of the public. Key topics studied in the RISCOM-II Project are issues in risk assessment to better understand how factual elements relate to value-laden issues and how stakeholder concerns can be addressed, as well as organizational issues affecting transparency in Europe. A range of public participation processes are analysed, some will be selected for testing and hearings are evaluated with respect to transparency. There are five participating countries: Sweden, the United Kingdom, Finland, the Czech Republic, and France, which are represented by various organizations: safety or radiation protection authorities, operators involved in nuclear wastes and the production of nuclear power, research institutes or organizations, and consultants. Work Package No 1(WP-1), Public values and performance assessment, emphasises the importance of value-laden issues involved in nuclear waste management. The expert dominance in the field has so far tended to avoid values or deal with them in seemingly factual frameworks. The objectives of (WP-1) are thus: 1. to identify value-laden issues raised by performance assessment, trying to understand how factual and technical elements relate to value-laden issues 2. to find value judgements of stakeholders, and explore if and how they could be addressed in performance assessment 3. to initiate open debate about risk and

  8. Public Values and Stakeholder Involvement - A new framework for Performance Assessment? The European Project RISCOM-II. Work Package 1

    International Nuclear Information System (INIS)

    Andersson, Kjell; Chataignier, Stephane; Drottz-Sjoeberg, Britt-Marie

    2002-11-01

    RISCOM-II is a project within the fifth framework programme of the European Commission. It is based on a widely recognised need for more transparent decision processes in nuclear waste management. The objective of the RISCOM-II project is to share the knowledge of the context of radioactive waste management in various European countries and to see to what extent it is possible to apply more widely the RISCOM Model in order to improve the acceptability of radioactive waste management. Thus, the project aims to promote the development of processes involving transparency, as well as means involving greater participation of the public. Key topics studied in the RISCOM-II Project are issues in risk assessment to better understand how factual elements relate to value-laden issues and how stakeholder concerns can be addressed, as well as organizational issues affecting transparency in Europe. A range of public participation processes are analysed, some will be selected for testing and hearings are evaluated with respect to transparency. There are five participating countries: Sweden, the United Kingdom, Finland, the Czech Republic, and France, which are represented by various organizations: safety or radiation protection authorities, operators involved in nuclear wastes and the production of nuclear power, research institutes or organizations, and consultants. Work Package No 1(WP-1), Public values and performance assessment, emphasises the importance of value-laden issues involved in nuclear waste management. The expert dominance in the field has so far tended to avoid values or deal with them in seemingly factual frameworks. The objectives of (WP-1) are thus: 1. to identify value-laden issues raised by performance assessment, trying to understand how factual and technical elements relate to value-laden issues 2. to find value judgements of stakeholders, and explore if and how they could be addressed in performance assessment 3. to initiate open debate about risk and

  9. A Framework for Coordination Process into Construction Projects

    Directory of Open Access Journals (Sweden)

    Alaloul Wesam S.

    2016-01-01

    Full Text Available Construction industry is recognized as high fragmentation, low efficiency, cost and time overruns in contrast with other industries. These peculiarities are the main roots of poor performance facing by the industry. Effective coordination is vital in construction projects success and mitigate the fragmentation dilemma, however it is often difficult to achieve and need iterative process. Coordination is core issue to improve performance in construction project. Relevant studies have addressed the coordination process importance and implementation, but not in a framework. This paper propose a framework for coordination process in construction projects, as well as its relationship with performance. The objective of the framework is to provide a roadmap for the construction parties to realize operational excellence so that collectively stakeholders can recognize the effect of coordination process application on the project performance. The data were obtained from literature review and structured interviews with five experts. The analysis produced the framework of coordination based on the extensively used procedures for information and data flow between stakeholders.

  10. The Memory-Impairing Effects of Septal GABA Receptor Activation Involve GABAergic Septo-Hippocampal Projection Neurons

    Science.gov (United States)

    Krebs-Kraft, Desiree L.; Wheeler, Marina G.; Parent, Marise B.

    2007-01-01

    Septal infusions of the [gamma]-aminobutyric acid (GABA)[subscript A] agonist muscimol impair memory, and the effect likely involves the hippocampus. GABA[subscript A] receptors are present on the perikarya of cholinergic and GABAergic septo-hippocampal (SH) projections. The current experiments determined whether GABAergic SH projections are…

  11. CQI project improves discharge process.

    Science.gov (United States)

    1998-08-01

    At Gibson Rehab Center in Williamsport, PA, a continuous quality improvement project to bolster the institution's discharge planning process has resulted in increased satisfaction and an award for quality. The 15-month project was spearheaded by a multidisciplinary team charged with identifying areas that had a significant impact on customer service and suggesting better ways of delivering that service. Among the changes the group suggested were establishing a weekly discharge planning group for new neuro patients, assigning a discharge coordinator for each treatment team, and creating an interdisciplinary communication sheet for the home health therapy staff.

  12. Understanding and Managing Process Interaction in IS Development Projects

    DEFF Research Database (Denmark)

    Bygstad, Bendik; Nielsen, Peter Axel

    2005-01-01

    Increasingly, information systems must be developed and implemented as a part of business change. This is a challenge for the IS project manager, since business change and information systems development usually are performed as separate processes. Thus, there is a need to understand and manage......-technical innovation in a situation where the organisational change process and the IS development process are parallel but incongruent. We also argue that iterative software engineering frameworks are well structured to support process interaction. Finally, we advocate that the IS project manager needs to manage...... the relationship between these two kinds of processes. To understand the interaction between information systems development and planned organisational change we introduce the concept of process interaction. We draw on a longitudinal case study of an IS development project that used an iterative and incremental...

  13. Involvement Without Participation?

    DEFF Research Database (Denmark)

    Olsén, Peter

    2012-01-01

    The article presents a case study of a knowledge-intensive company that launched a 2-year project to improve their psychosocial working environment. All parties agreed on the project, and the methods used aimed to promote the involvement of the employees. Surprisingly, the psychosocial working...... environment did not improve; on the contrary, it deteriorated. The article highlights cultural and structural obstacles to the process, including an inadequate understanding of organisational learning and a narrow focus on market and competition. The endeavours did not consistently increase delegation...

  14. SNF project engineering process improvement plan

    International Nuclear Information System (INIS)

    DESAI, S.P.

    1999-01-01

    This Engineering Process Improvement Plan documents the activities and plans to be taken by the SNF Project to support its engineering process and to produce a consolidated set of engineering procedures that are fully compliant with the requirements of HNF-PRO-1819. All new procedures will be issued and implemented by September 30, 1999

  15. 32 CFR 37.220 - How involved should the Government program official be in the project?

    Science.gov (United States)

    2010-07-01

    ... official be in the project? 37.220 Section 37.220 National Defense Department of Defense OFFICE OF THE... Technology Investment Agreements § 37.220 How involved should the Government program official be in the project? (a) TIAs are used to carry out cooperative relationships between the Federal Government and the...

  16. Prioritizing the countries for BOT nuclear power project using Analytic Hierarchy Process

    International Nuclear Information System (INIS)

    Choi, Sun Woo; Roh, Myung Sub

    2013-01-01

    This paper proposes factors influencing the success of BOT nuclear power projects and their weighting method using Analytic Hierarchy Process (AHP) to find the optimal country which developer intends to develop. To summarize, this analytic method enable the developer to select and focus on the country which has preferable circumstance so that it enhances the efficiency of the project promotion by minimizing the opportunity cost. Also, it enables the developer to quantify the qualitative factors so that it diversifies the project success strategy and policy for the targeted country. Although the performance of this study is insufficient due to the limitation of time, small sampling and security of materials, it still has the possibility to improve the analytic model more systematically through further study with more data. Developing Build-Own(or Operate)-Transfer (BOT) nuclear power project carrying large capital in the long term requires initially well-made multi-decision which it prevents sorts of risks from unexpected situation of targeted countries. Moreover, the nuclear power project in most case is practically implemented by Government to Government cooperation, so the key concern for such nuclear power project would be naturally focused on the country situation rather than project viability at planning stage. In this regard, it requires the evaluation of targeted countries before involving the project, comprehensive and proper decision making for complex judgment factors, and efficient integration of expert's opinions, etc. Therefore, prioritizing and evaluating the feasibility of country for identification of optimal project region is very meaningful study

  17. The evolution of a doctor of nursing practice capstone process: programmatic revisions to improve the quality of student projects.

    Science.gov (United States)

    Nelson, Joan M; Cook, Paul F; Raterink, Ginger

    2013-01-01

    The past several years have seen explosive growth in the number of doctor of nursing practice (DNP) degree programs offered by colleges of nursing in the United States. Through a process of trial and error since 2005, the faculty at the University of Colorado, College of Nursing, have revised the course structure and procedures related to the DNP capstone project to improve the quality and usefulness of these student projects. Efforts have focused on educating and involving all nursing faculty in the DNP capstone process, distinguishing between competencies for our PhD and DNP projects, clearly aligning the DNP capstone project with quality improvement methods rather than with research, working with our campus institutional review board to clarify regulatory review requirements for quality improvement studies, developing a review committee to oversee DNP students' projects, and structuring our sequential course requirements to encourage students' professional presentations and publications. Our current capstone process reflects 7 years of iterative work, which we summarize in this article in hopes that it will help institutions currently in the process of developing a DNP program. Copyright © 2013 Elsevier Inc. All rights reserved.

  18. Factors Affecting Process Innovation Teams’ Learning and Their Impact on the Success of the Process Innovation Projects

    Directory of Open Access Journals (Sweden)

    İbrahim H. Seyrek

    2007-06-01

    Full Text Available Based on 145 process innovation teams, we have studied factors supporting team learning and their impact on the success of the process innovation projects. As a result, we have found that team vision, recording and reviewing project related information, filing, following a structural development process and co-location of team members are factors supporting team learning and project success. Also, two dimensions of learning, information acquisition and information implementation, are positively related to the success of the process innovation projects

  19. A Survey of Industrial Involvement in Open Source

    OpenAIRE

    Røsdal, Andreas

    2006-01-01

    This thesis presents the results of an explorative survey of industrial involvement in open source. The survey is performed in collaboration with participants from the European ITEA project, COSI (Co-development using inner & Open source in Software Intensive products). The survey was performed to explore aspects of industrial involvement in open source, as industrial management of open source project, industrial use of open source components, related development, and communication processes,...

  20. Involving IDPs in the Darfur peace process

    Directory of Open Access Journals (Sweden)

    David Lanz

    2008-04-01

    Full Text Available The UN estimates that there are 2.4 millionIDPs in Darfur –over one third of the totalpopulation. There can be no meaningfulpeace process without their involvement.Giving IDPs a formal seat in official peacenegotiations is problematic but there areother ways to ensure their participation.

  1. Hydrogen production through photovoltaic processes: Italian ENEA and other research projects

    International Nuclear Information System (INIS)

    Barra, L.; Coiante, D.

    1992-01-01

    Brief arguments favouring greater emphasis by government R ampersand D strategies on commercialization efforts to further develop hydrogen production processes involving the use of renewable energy sources are presented. These include the worsening global greenhouse effect problems due to the intensified use of fossil fuels and recent technological advances being made in photovoltaic energy conversion. A world-wide review is then made of on-going research programs in hydrogen production through the use of hydroelectric and solar energy sources. This review provides outlines of project objectives, schedules and financing schemes. Attention is given to the commercialization programs and strategies of ENEA (Italian Commission for New Technologies, Energy and the Environment)

  2. Computer aided process planning at the Oak Ridge Y-12 plant: a pilot project

    International Nuclear Information System (INIS)

    Hewgley, R.E. Jr.; Prewett, H.P. Jr.

    1979-01-01

    In 1976, a formal needs analysis was conducted in one of the Fabrication Division Shops of all activities from the receipt of an order through final machining. The results indicated deficiencies in process planning activities involving special production work. A pilot program was organized to investigate the benefits of emerging CAM technology and application of GT concepts for machining operations at the Y-12 Plant. The objective of the CAPP Project was to provide computer-assisted process planning for special production machining in th shop. The CAPP team was charged with the specific goal of demonstrating computer-aided process planning within a four-year term. The CAPP charter included a plan with intermediate measurable milestones for achieving its mission. In three years, the CAPP project demonstrated benefits to process planning. A capability to retrieve historical records for similar parts, to review accurately the status of all staff assignments, and to generate detailed machining procedures definitely can impact the way in which a machine shop prepared for new orders. The real payoff is in the hardcopy output (N/C programs, studies, sequence plans, and procedures). 4 figures,

  3. Linking Effective Project Management to Business Strategy in Oil and Gas Industry through Decision-making Processes

    Science.gov (United States)

    Adeleke, Adeyinka

    The construction project in the oil and gas industry covers the entire spectrum of hydrocarbon production from the wellhead (upstream) to downstream facilities. In each of these establishments, the activities in a construction project include: consulting, studies, front-end engineering, detail engineering, procurement, program management, construction, installation, commissioning and start-up. Efficient management of each of the activities involved in construction projects is one of the driving forces for the successful completion of the project. Optimizing the crucial factors in project management during each phase of a project in an oil and gas industry can assist managers to maximize the use of available resources and drive the project to successful conclusions. One of these factors is the decision-making process in the construction project. Current research effort investigated the relationship between decision-making processes and business strategy in oil and gas industry using employee surveys. I recruited employees of different races, age group, genders, and years of experience in order understand their influence on the implementation of the decision-making process in oil and gas industry through a quantitative survey. Decision-making was assessed using five decision measures: (a) rational, (b) intuitive, (c) dependent, (d) avoidant, and (e) spontaneous. The findings indicated gender, age, years of work experience and job titles as primary variables with a negative relationship with decision-making approach for employees working in a major oil and gas industry. The study results revealed that the two most likely decision-making methods in oil and gas industry include: making a decision in a logical and systematic way and seek assistance from others when making a decision. Additionally, the two leading management approaches to decision-making in the oil and gas industry include: decision analysis is part of organization culture and management is committed to

  4. Guidebook on the development of projects for uranium mining and ore processing

    International Nuclear Information System (INIS)

    1991-04-01

    Bringing a uranium operation into production involves a sequence of interrelated steps. These are outlined in the simplified diagram of Fig. 1. The challenge is to determine how the various steps of the development sequence should function and whether the costs are sufficiently low to return a positive benefit to the owner. This Guidebook has been prepared to aid in the planning, development and implementation of feasible uranium projects. It is one in a series of publications by the IAEA. This guidebook is essentially the executive summary of the other publications. It is an overview of the systematic approach to project development. It might be viewed as the ''road map'' of a project. A list of other publications in this series is provided in the Bibliography. Each chapter of the Guidebook addresses a critical aspect of project development. Chapters follow a general sequence, but none should be considered in isolation. Each Chapter presents an overview of the requirements for reaching decisions necessary to advance a project. References are provided to more definitive information and to documents which will be required by technical personnel on a project. Such detailed publications include IAEA books such as ''An Instruction Manual on Methods for Estimation of Uranium Ore Reserves'', and the ''Significance of Mineralogy in the Development of Flow Sheets for Processing Uranium Ores''. This Guidebook does not detail how to do project development but rather what must be done to insure that all critical elements of a project are considered. Refs, figs and tabs

  5. Process competencies in a problem and project based learning environment

    DEFF Research Database (Denmark)

    Du, Xiangyun; Kolmos, Anette

    2006-01-01

    with the expected professional competencies. Based on the educational practice of PBL Aalborg Model, which is characterized by problem-orientation, project-organization and team work, this paper examines the process of developing process competencies through studying engineering in a PBL environment from...... process competencies through doing problem and project based work in teams? 2) How do students perceive their achievement of these process competencies?......Future engineers are not only required to master technological competencies concerning solving problems, producing and innovating technology, they are also expected to have capabilities of cooperation, communication, and project management in diverse social context, which are referred to as process...

  6. Pre-contract project scoping processes : synthesis of practices.

    Science.gov (United States)

    2016-02-01

    Scoping is the process of developing a projects objectives, need, preliminary cost estimate, and preliminary schedule based on a : recognized need that the project is intended to address. This study (INDOT/JTRP SPR-3944) was launched by the Indian...

  7. Learning effects of active involvement of secondary school students in scientific research within the Sparkling Science project "FlussAu:WOW!"

    Science.gov (United States)

    Poppe, Michaela; Zitek, Andreas; Scheikl, Sigrid; Heidenreich, Andrea; Kurz, Roman; Schrittwieser, Martin; Muhar, Susanne

    2014-05-01

    Due to immense technological and economic developments, human activities producing greenhouse gases, destructing ecosystems, changing landscapes and societies are influencing the world to such a degree, that the environment and human well-being are significantly affected. This results in a need to educate citizens towards a scientific understanding of complex socio-environmental systems. The OECD programme for international student assessment (PISA - http://www.pisa.oecd.org) investigated in detail the science competencies of 15-year-old students in 2006. The report documented that teenagers in OECD countries are mostly well aware of environmental issues but often know little about their causes or options to tackle these challenges in the future. For the integration of science with school learning and involving young people actively into scientific research Sparkling Science projects are funded by the Federal Ministry of Science and Research in Austria. Within the Sparkling Science Project "FlussAu:WOW!" (http://www.sparklingscience.at/de/projekte/574-flussau-wow-/) scientists work together with 15 to 18-year-old students of two Austrian High Schools over two years to assess the functions and processes in near natural and anthropogenically changed river floodplains. Within the first year of collaboration students, teachers and scientists elaborated on abiotic, biotic and spatial indicators for assessing and evaluating the ecological functionality of riverine systems. After a theoretical introduction students formulated research questions, hypotheses and planned and conducted field work in two different floodplain areas in Lower Austria. From the second year on, students are going to develop qualitative models on processes in river floodplain systems by means of the learning software "DynaLearn". The "DynaLearn" software is an engaging, interactive, hierarchically structured learning environment that was developed within the EU-FP7 project "DynaLearn" (http

  8. Understanding the selection processes of public research projects

    NARCIS (Netherlands)

    Materia, V.C.; Pascucci, S.; Kolympiris, C.

    2015-01-01

    This paper analyses factors that affect the funding of agricultural research projects by regional governments and other regional public authorities. We study the selection process of agricultural research projects funded by the emilia Romagna regional government in Italy, which follows funding

  9. A project management focused framework for assuring quality work processes

    Energy Technology Data Exchange (ETDEWEB)

    Gamsby, S.O.; Mize, J.D. [Allied Signal, Inc., Albuquerque, NM (United States). Federal Mfg. and Technologies; Reid, R.A. [New Mexico Univ., Albuquerque, NM (United States)

    1996-10-01

    Federal Manufacturing & Technologies/New Mexico (FM&T/NM) of AlliedSignal is an organization of approximately 300 associates providing operations support, engineering, and other technical services for DOE, New Mexico`s National Laboratories, etc. Work performed is primarily project-oriented and ranges from executing a major long-term contract for retrofitting and maintaining a large fleet of escort vehicles to creating a single, small, prototype electronic device for measuring radiation in a unique environment. FM&T/NM is functionally organized and operates in a classic matrix format with functional departments providing personnel with technical expertise, necessary physical resources, and administrative support to several project-based groups. Like most matrix-based organizations that provide support to diverse customers, FM&T/NM has encountered problems that occur when a group of project managers is expected to work together in using and scheduling a shared set of limited resources for the good of the organization as a whole. The framework for managing projects that we present focuses on developing, understanding, and managing the relationships between the functional organization structure, the system of work processes, and the management of projects. FM&T/NM retains its functional structure which primarily assigns personnel to work processes. The evolving role of the process leader focuses primarily on designing, managing, and improving the process, and the interactions among the subprocesses. The project manager is responsible for (1) translating customer requirements into product specifications, (2) determining the sequence of activities needed to meet project goals, (3) scheduling the required work processes, (4) monitoring project progress, (5) providing liaison between the customer and process leaders, and (6) having the desired product and/or service delivered to a satisfied customer in a timely manner.

  10. Stakeholders involvement in the decommissioning processes in Italy

    International Nuclear Information System (INIS)

    Dionisi, Mario

    2006-01-01

    The aim of this paper is to present the situation about stakeholders involvement in Italy in the framework of the decommissioning process of the Italian nuclear installations, and in particular the specific experience of the Italian Regulatory Body APAT. Specific aspects and APAT initiatives for building confidence of stakeholders in the process of the release of solid material from the regulatory control are presented. Content: Decommissioning activities in Italy, Decommissioning licensing procedures (Site and material release, APAT - ARPA Partnership approach in the clearance process)

  11. Process simulation and parametric modeling for strategic project management

    CERN Document Server

    Morales, Peter J

    2013-01-01

    Process Simulation and Parametric Modeling for Strategic Project Management will offer CIOs, CTOs and Software Development Managers, IT Graduate Students an introduction to a set of technologies that will help them understand how to better plan software development projects, manage risk and have better insight into the complexities of the software development process.A novel methodology will be introduced that allows a software development manager to better plan and access risks in the early planning of a project.  By providing a better model for early software development estimation and softw

  12. Software Quality Perceptions of Stakeholders Involved in the Software Development Process

    Science.gov (United States)

    Padmanabhan, Priya

    2013-01-01

    Software quality is one of the primary determinants of project management success. Stakeholders involved in software development widely agree that quality is important (Barney and Wohlin 2009). However, they may differ on what constitutes software quality, and which of its attributes are more important than others. Although, software quality…

  13. Short Project-Based Learning with MATLAB Applications to Support the Learning of Video-Image Processing

    Science.gov (United States)

    Gil, Pablo

    2017-10-01

    University courses concerning Computer Vision and Image Processing are generally taught using a traditional methodology that is focused on the teacher rather than on the students. This approach is consequently not effective when teachers seek to attain cognitive objectives involving their students' critical thinking. This manuscript covers the development, implementation and assessment of a short project-based engineering course with MATLAB applications Multimedia Engineering being taken by Bachelor's degree students. The principal goal of all course lectures and hands-on laboratory activities was for the students to not only acquire image-specific technical skills but also a general knowledge of data analysis so as to locate phenomena in pixel regions of images and video frames. This would hopefully enable the students to develop skills regarding the implementation of the filters, operators, methods and techniques used for image processing and computer vision software libraries. Our teaching-learning process thus permits the accomplishment of knowledge assimilation, student motivation and skill development through the use of a continuous evaluation strategy to solve practical and real problems by means of short projects designed using MATLAB applications. Project-based learning is not new. This approach has been used in STEM learning in recent decades. But there are many types of projects. The aim of the current study is to analyse the efficacy of short projects as a learning tool when compared to long projects during which the students work with more independence. This work additionally presents the impact of different types of activities, and not only short projects, on students' overall results in this subject. Moreover, a statistical study has allowed the author to suggest a link between the students' success ratio and the type of content covered and activities completed on the course. The results described in this paper show that those students who took part

  14. 44 CFR 5.8 - Records involved in litigation or other judicial process.

    Science.gov (United States)

    2010-10-01

    ... litigation or other judicial process. 5.8 Section 5.8 Emergency Management and Assistance FEDERAL EMERGENCY... Provisions § 5.8 Records involved in litigation or other judicial process. Where there is reason to believe that any records requested may be involved in litigation or other judicial process in which the United...

  15. Engaging clinicians in health informatics projects.

    Science.gov (United States)

    Caballero Muñoz, Erika; Hullin Lucay Cossio, Carola M

    2010-01-01

    This chapter gives an educational overview of: * The importance of the engagement of clinicians within a health informatics project * Strategies required for an effective involvement of clinicians throughout a change management process within a clinical context for the implementation of a health informatics project * The critical aspects for a successful implementation of a health informatics project that involves clinicians as end users * Key factors during the administration of changes during the implementation of an informatics project for an information system in clinical practice.

  16. Integrating a Procurement Management Process into Critical Chain Project Management (CCPM: A Case-Study on Oil and Gas Projects, the Piping Process

    Directory of Open Access Journals (Sweden)

    Sung-Hwan Jo

    2018-05-01

    Full Text Available Engineering, Procurement, and Construction (EPC of oil and gas megaprojects often experience cost overruns due to substantial schedule delays. One of the greatest causes of these overruns is the mismanagement of the project schedule, with the piping works (prefabrication and installation occupying a majority of that schedule. As such, an effective methodology for scheduling, planning, and controlling of piping activities is essential for project success. To meet this need, this study used the Critical Chain Project Management (CCPM to develop a piping construction delay prevention methodology, incorporating material procurement processes for EPC megaprojects. Recent studies indicate that the traditional scheduling method used on oil and gas mega projects has critical limitations regarding resource scarcity, calculation of activity duration, and dealing with uncertainties. To overcome these limitations, the Theory of Constraints-based CCPM was proposed and implemented to provide schedule buffers management. Nonexistent in literature, and of critical importance, is this paper’s focus on the resource buffer, representing material uncertainty and management. Furthermore, this paper presents a step-by-step process and flow chart for project, construction, and material managers to effectively manage a resource buffer through the CCPM process. This study extends the knowledge of traditional resource buffers in CCPM to improve material and procurement management, thus avoiding the shortage of piping materials and minimizing delays. The resultant process was validated by both deterministic and probabilistic schedule analysis through two case studies of a crude pump unit and propylene compressor installation at a Middle Eastern Refinery Plant Installation. The results show that the CCPM method effectively handles uncertainty, reducing the duration of piping works construction by about a 35% when compared to the traditional method. Furthermore, the

  17. Comprehensive Sustainability Evaluation of High-Speed Railway (HSR Construction Projects Based on Unascertained Measure and Analytic Hierarchy Process

    Directory of Open Access Journals (Sweden)

    Yongzhi Chang

    2018-02-01

    Full Text Available This paper aims to evaluate the sustainability of high-speed railway (HSR construction projects in a comprehensive manner. To this end, the author established an index system, involving 4 primary indices, 9 secondary indices, and 32 tertiary indices. The analytic hierarchy process (AHP and the unascertained measure were introduced to calculate the weights of these indices. Then, the index system was applied to evaluate the sustainability of the China’s Harbin-Dalian Passenger Dedicated Line (PDL. The results show that the Harbin-Dalian PDL project achieved good results in terms of process, economic benefit, impact, and sustainability, and will bring long-term benefits in the fields of tourism, economy, and transport capacity, as well as many other fields. In spite of its good overall sustainability, the project needs to further increase its economic benefits and reduce its negative environmental impact. For this purpose, it is necessary to adopt the management mode of “separation between network and transportation” and apply noise prevention measures like noise barriers, tunnels, and overhead viaducts. This research lays a solid basis for the sustainability evaluation of HSR construction projects, and simplifies the modelling process for designers of HSR.

  18. Management of Multi-projects In a Process oriented Organization

    OpenAIRE

    Macheridis, Nikos; Nilsson, Carl-Henrik

    2006-01-01

    When projects are used as an organisational platform to conduct business, a project can be the only project in the organisation or one amongst several others. The latter case is called multi-project organisation. Usually an organization with a multi-project environment has a base organisation, which can be functional, matrix structure or another. The purpose of this article is to develop a model based on a process oriented organization as a complement to functional or matrix organizational st...

  19. Managing projects for life cycle success : perfecting the process

    Energy Technology Data Exchange (ETDEWEB)

    Jenkins, A. [TransCanada PipeLines Ltd., Calgary, AB (Canada); Babuk, T. [Empress International Inc., Westwood, NJ (United States); Mohitpour, M. [Tempsys Pipeline Solutions Inc., Vancouver, BC (Canada)

    2004-07-01

    This paper presented a historical summary of traditional project management along with a discussion on the project management and development philosophy that can be used in a large infrastructure company that develops and operates its own projects and facilities. Two case studies from the experiences of TransCanada Pipelines Limited were also presented. It was suggested that companies seeking a first-rate reputation must maintain a long-term focus with emphasis on the improvement of the total process and harmony with the environment and community. This paper explained how project managers can create balance between the proponents, stakeholders, participants and the people and the environment while ensuring a cost effective quality product over time. Successful project managers were shown to understand and manage the components of scope, time, cost, quality, human resources, communication, risk, purchasing, safety and harmony with the community. Project development from the perspective of an owner-operator was presented with reference to consistency in approach and the decision making process. It was concluded that although project managers should focus on controlling and minimizing capital expenditures during project engineering and construction, the many elements that contribute to a project's value should also be recognized. 10 refs., 6 figs.

  20. Final Report Collaborative Project. Improving the Representation of Coastal and Estuarine Processes in Earth System Models

    Energy Technology Data Exchange (ETDEWEB)

    Bryan, Frank [National Center for Atmospheric Research, Boulder, CO (United States); Dennis, John [National Center for Atmospheric Research, Boulder, CO (United States); MacCready, Parker [Univ. of Washington, Seattle, WA (United States); Whitney, Michael [Univ. of Connecticut

    2015-11-20

    This project aimed to improve long term global climate simulations by resolving and enhancing the representation of the processes involved in the cycling of freshwater through estuaries and coastal regions. This was a collaborative multi-institution project consisting of physical oceanographers, climate model developers, and computational scientists. It specifically targeted the DOE objectives of advancing simulation and predictive capability of climate models through improvements in resolution and physical process representation. The main computational objectives were: 1. To develop computationally efficient, but physically based, parameterizations of estuary and continental shelf mixing processes for use in an Earth System Model (CESM). 2. To develop a two-way nested regional modeling framework in order to dynamically downscale the climate response of particular coastal ocean regions and to upscale the impact of the regional coastal processes to the global climate in an Earth System Model (CESM). 3. To develop computational infrastructure to enhance the efficiency of data transfer between specific sources and destinations, i.e., a point-to-point communication capability, (used in objective 1) within POP, the ocean component of CESM.

  1. Flexible Processes in Project-Centred Learning

    NARCIS (Netherlands)

    Ceri, Stefano; Matera, Maristella; Raffio, Alessandro; Spoelstra, Howard

    2007-01-01

    Ceri, S., Matera, M., Raffio, A. & Spoelstra, H. (2007). Flexible Processes in Project-Centred Learning. In E. Duval, R. Klamma, and M. Wolpers (Eds.), European Conference on Technology Enhanced Learning, Lecture Notes in Computer Science, Vol. 4753, pp. 463-468. Berlin Heidelberg: Springer-Verlag

  2. Proceedings of the topical session on stakeholder involvement in decommissioning projects

    International Nuclear Information System (INIS)

    Santiago, Juan Luis; Chandler, Steve; Metcalfe, Doug; Le Bars, Yves

    2006-01-01

    Set up by the Radioactive Waste Management Committee (RWMC), the WPDD brings together senior representatives of national organisations who have a broad overview of Decommissioning and Dismantling (D and D) issues through their work as regulators, implementers, R and D experts or policy makers. These include representatives from regulatory authorities, industrial decommissioners from the NEA Co-operative Programme on Exchange of Scientific and Technical Information on Nuclear Installation Decommissioning Projects (CPD), and cross-representation from the other NEA Committees. The EC is a member of the WPDD and the IAEA is participating as an observer. This broad participation provides good possibilities for the co-ordination efforts amongst activities in the international programmes. At its sixth meeting, in Paris, 14-16 November 2005, the WPDD held a topical session on the 'Stakeholder Involvement in Decommissioning Projects'. The topical session was jointly planned and run with members of the NEA Forum on Stakeholder Confidence (FSC). This report documents the topical session. The main text summarises the lessons learnt and includes the rapporteurs reports. Appendix 1 and 2 provide the agenda of the topical session and all contributed papers respectively. The Topical session also provided a stimuli to review all the contributions in the area of stakeholder involvement that the WPDD has received since its inception. A list of references is provided in Appendix 3. The topical session was meant to provide an exchange of information and experience on the following issues: - Views from Stakeholders Regarding Stakeholder Involvement and Their Own Role. - Case Studies on Stakeholders Confidence. At the end of each session time was allotted for a plenary discussion. The Rapporteur reviewed the main points and the lessons learnt at the end of the whole Topical Session. (authors)

  3. Risk Identification and Assessment in PPP Infrastructure Projects using Fuzzy Analytical Hierarchy Process and Life-Cycle Methodology

    Directory of Open Access Journals (Sweden)

    Jie Li

    2012-11-01

    Full Text Available To fulfil the increasing demands of the public,Public Private Partnership (PPP has beenincreasingly used to procure infrastructureprojects, such as motor ways, bridges, tunnelsand railways. However, the risks involved inPPP projects are unique and dynamic due tolarge amount of investment and longconcession period. This paper aims to developa risk identification framework from theperspectives of project life cycle, and anassessment framework for risks associatedwith PPP project using fuzzy analyticalhierarchy process (AHP. First the paperreviews the current literature to identifycommon risks in PPP infrastructure projectsand classification methods used. The risksidentified from the literature were classifiedusing project life cycle perspectives. Followingthat, the paper presents the advantages offuzzy AHP. Furthermore, the paper provides aframework for assessment of risks in PPPprojects followed by an illustrative examplewhere the data was obtained from surveyquestionnaires. The paper concludes that risksassociated in PPP infrastructure projects areunique and therefore it is beneficial to classifythem from project life cycle perspectives, andthe proposed fuzzy AHP method is suitable forthe assessment of these risks.

  4. The Role of Demonstration Projects in Construction innovation processes

    DEFF Research Database (Denmark)

    Clausen, Lennie

    1999-01-01

    The article is describing the methodology of a case-study approach to the investigation of demonstration projects and their impact on the development of process and product innovations in the construction industry.......The article is describing the methodology of a case-study approach to the investigation of demonstration projects and their impact on the development of process and product innovations in the construction industry....

  5. Strategy Innovation with Employee Involvement

    DEFF Research Database (Denmark)

    Friis, Ole Uhrskov; Koch, Christian

    2015-01-01

    The purpose of this article is to investigate how employees can be involved in strategy innovation processes and how new strategy practices (new tools and procedures) are used to change strategy praxis in order to sustain value creation. In the strategizing actions, we found that even...... if the managers still dominate, some processes of direct involvement of employees occur, in particular when employees are asked to supplement overall strategic goals and when they directly shape several sub-strategies. Strategy practices found include strategy planning, an open space workshop and organised...... strategy projects. Especially the latter two are important in facilitating the employee involvement. The case, however, also exhibits enterprise-situated praxises related to unplanned events, like the mitigation of taboos....

  6. Patient involvement in hospital architecture

    DEFF Research Database (Denmark)

    Herriott, Richard

    2017-01-01

    the structure of the design process, identification and ranking of stakeholders, the methods of user-involvement and approaches to accessibility. The paper makes recommendations for a change of approach to user-participation in large-scale, long-duration projects. The paper adds new insight on an under...

  7. A Process Towards Societal Value within a Community-Based Regional Development Project

    Directory of Open Access Journals (Sweden)

    Anna Åslund

    2012-12-01

    Full Text Available Processes, activities and tasks of a community-based area development project are described. The main process has been used three times and a model is presented. An earlier developed process map has been verified. The description of the project can help other communities to plan development projects. The illustration can be valuable for entrepreneurs who are planning a societal value initiative and for decision-makers and stakeholders who can contribute to, are concerned with, or may be affected by societal entrepreneurship. Observation, participating studies, dokumentations and an interview with the project leader has been carried out. Data have been analyzed and compared with the previously developed process map to achieve a deeper understanding of the processes within societal entrepreneurship. The purpose was to study and describe the processes of a community-based area development project and to compare it with a previously developed process map and to verify the process map.

  8. The Interaction between Personality, Social Network Position and Involvement in Innovation Process

    NARCIS (Netherlands)

    E. Dolgova (Evgenia); W. van Olffen (Woody); F.A.J. van den Bosch (Frans); H.W. Volberda (Henk)

    2010-01-01

    textabstractAbstract This dissertation proposal investigates how personality and individuals’ social network position affect individuals’ involvement into the innovation process. It posits that people would feel inclined to become involved into the different phases of the innovation process

  9. Identifying challenges in project consultants engagement practices

    Science.gov (United States)

    Shariffuddin, Nadia Alina Amir; Abidin, Nazirah Zainul

    2017-10-01

    Construction projects, green or conventional, involve multi-faceted disciplines engaged with the goal of delivering products i.e. building, infrastructure etc. at the best quality within stipulated budgets. For green projects, additional attention is added for environmental quality. Due to the various responsibilities and liabilities involved as well as the complexity of the construction process itself, formal engagement of multi-disciplinary professionals i.e. project consultants is required in any construction project. Poor selection of project consultants will lead to a multitude of complications resulting in delay, cost escalation, conflicts and poor quality. This paper explores the challenges that occur during the engagement of project consultants in a green project. As the engagement decision involves developers and architects, these two groups of respondents with green project backgrounds were approached qualitatively using interview technique. The challenges identified are limited experience and knowledge, consultants' fee vs. quality, green complexity, conflicts of interest, clients' extended expectation and less demand in green projects. The construction shifts to green project demands engagement of project consultants with added skills. It is expected that through the identification of challenges, better management and administration can be created which would give impact to the overall process of engagement in green projects.

  10. Processes involved in solving mathematical problems

    Science.gov (United States)

    Shahrill, Masitah; Putri, Ratu Ilma Indra; Zulkardi, Prahmana, Rully Charitas Indra

    2018-04-01

    This study examines one of the instructional practices features utilized within the Year 8 mathematics lessons in Brunei Darussalam. The codes from the TIMSS 1999 Video Study were applied and strictly followed, and from the 183 mathematics problems recorded, there were 95 problems with a solution presented during the public segments of the video-recorded lesson sequences of the four sampled teachers. The analyses involved firstly, identifying the processes related to mathematical problem statements, and secondly, examining the different processes used in solving the mathematical problems for each problem publicly completed during the lessons. The findings revealed that for three of the teachers, their problem statements coded as `using procedures' ranged from 64% to 83%, while the remaining teacher had 40% of his problem statements coded as `making connections.' The processes used when solving the problems were mainly `using procedures', and none of the problems were coded as `giving results only'. Furthermore, all four teachers made use of making the relevant connections in solving the problems given to their respective students.

  11. Classification of processes involved in sharing individual participant data from clinical trials.

    Science.gov (United States)

    Ohmann, Christian; Canham, Steve; Banzi, Rita; Kuchinke, Wolfgang; Battaglia, Serena

    2018-01-01

    Background: In recent years, a cultural change in the handling of data from research has resulted in the strong promotion of a culture of openness and increased sharing of data. In the area of clinical trials, sharing of individual participant data involves a complex set of processes and the interaction of many actors and actions. Individual services/tools to support data sharing are available, but what is missing is a detailed, structured and comprehensive list of processes/subprocesses involved and tools/services needed. Methods : Principles and recommendations from a published data sharing consensus document are analysed in detail by a small expert group. Processes/subprocesses involved in data sharing are identified and linked to actors and possible services/tools. Definitions are adapted from the business process model and notation (BPMN) and applied in the analysis. Results: A detailed and comprehensive list of individual processes/subprocesses involved in data sharing, structured according to 9 main processes, is provided. Possible tools/services to support these processes/subprocesses are identified and grouped according to major type of support. Conclusions: The list of individual processes/subprocesses and tools/services identified is a first step towards development of a generic framework or architecture for sharing of data from clinical trials. Such a framework is strongly needed to give an overview of how various actors, research processes and services could form an interoperable system for data sharing.

  12. Involving women.

    Science.gov (United States)

    Agbo, J

    1994-01-01

    I am a primary health care (PHC) coordinator working with the May Day Rural project, a local NGO involved in integrated approaches and programs with rural communities in the Ga District of the Greater-Accra region in Ghana. When we talk about the community development approach we must first and foremost recognize that we are talking about women, because in the developing world frequent childbirths mean that her burden of mortality is higher than a man's; her workload is extremely heavy--whether in gardening, farming, other household duties, caring for the sick, or the rearing of children; she has a key role in PHC and community development, because men are always looking for greener pastures elsewhere, leaving the women behind. Women's concerns are critical in most health care projects and women and children are their main beneficiaries. Why not include women in the management team, project design, implementation and evaluation processes? That is what the May Day Rural project is practicing, encouraging women's participation and creating a relationship of trust. full text

  13. Assessment Approach for Identifying Compatibility of Restoration Projects with Geomorphic and Flooding Processes in Gravel Bed Rivers.

    Science.gov (United States)

    DeVries, Paul; Aldrich, Robert

    2015-08-01

    A critical requirement for a successful river restoration project in a dynamic gravel bed river is that it be compatible with natural hydraulic and sediment transport processes operating at the reach scale. The potential for failure is greater at locations where the influence of natural processes is inconsistent with intended project function and performance. We present an approach using practical GIS, hydrologic, hydraulic, and sediment transport analyses to identify locations where specific restoration project types have the greatest likelihood of working as intended because their function and design are matched with flooding and morphologic processes. The key premise is to identify whether a specific river analysis segment (length ~1-10 bankfull widths) within a longer reach is geomorphically active or inactive in the context of vertical and lateral stabilities, and hydrologically active for floodplain connectivity. Analyses involve empirical channel geometry relations, aerial photographic time series, LiDAR data, HEC-RAS hydraulic modeling, and a time-integrated sediment transport budget to evaluate trapping efficiency within each segment. The analysis segments are defined by HEC-RAS model cross sections. The results have been used effectively to identify feasible projects in a variety of alluvial gravel bed river reaches with lengths between 11 and 80 km and 2-year flood magnitudes between ~350 and 1330 m(3)/s. Projects constructed based on the results have all performed as planned. In addition, the results provide key criteria for formulating erosion and flood management plans.

  14. Assessment Approach for Identifying Compatibility of Restoration Projects with Geomorphic and Flooding Processes in Gravel Bed Rivers

    Science.gov (United States)

    DeVries, Paul; Aldrich, Robert

    2015-08-01

    A critical requirement for a successful river restoration project in a dynamic gravel bed river is that it be compatible with natural hydraulic and sediment transport processes operating at the reach scale. The potential for failure is greater at locations where the influence of natural processes is inconsistent with intended project function and performance. We present an approach using practical GIS, hydrologic, hydraulic, and sediment transport analyses to identify locations where specific restoration project types have the greatest likelihood of working as intended because their function and design are matched with flooding and morphologic processes. The key premise is to identify whether a specific river analysis segment (length ~1-10 bankfull widths) within a longer reach is geomorphically active or inactive in the context of vertical and lateral stabilities, and hydrologically active for floodplain connectivity. Analyses involve empirical channel geometry relations, aerial photographic time series, LiDAR data, HEC-RAS hydraulic modeling, and a time-integrated sediment transport budget to evaluate trapping efficiency within each segment. The analysis segments are defined by HEC-RAS model cross sections. The results have been used effectively to identify feasible projects in a variety of alluvial gravel bed river reaches with lengths between 11 and 80 km and 2-year flood magnitudes between ~350 and 1330 m3/s. Projects constructed based on the results have all performed as planned. In addition, the results provide key criteria for formulating erosion and flood management plans.

  15. Secretory processes involved in the formation of milk

    International Nuclear Information System (INIS)

    Knutsson, P.G.

    1976-01-01

    Current knowledge on milk formation is reviewed. Emphasis is given to sites of formation of protein, fat and lactose, and transfer of these compounds into the alveolar lumen. Further, the formation of the water phase of milk is thoroughly discussed, and evidence presented that milk formation includes both secretory and re-absorptive processes as well as diffusion. A short presentation of colostrum formation is included. Neither biochemical processes involved in synthesis of organic compounds nor mammary gland endocrinology are discussed. (author)

  16. Process evaluation of an interorganizational cooperation initiative in vocational rehabilitation: the Dirigo project.

    Science.gov (United States)

    Ståhl, Christian; Andersén, Åsa; Anderzén, Ingrid; Larsson, Kjerstin

    2017-05-11

    This study analyzes the process of establishing and developing a cooperative vocational rehabilitation project with special focus on organizational and professional aspects. In the project, officials from the Swedish Social Insurance Agency and the Swedish Public Employment Service worked cooperatively with participants on long-term sick leave, youths with disability benefits, and people receiving social allowances. The officials used Motivational Interviewing (MI) as a method when meeting participants, and were able to offer flexible and tailored case management. The goal was to improve work ability and promote self-sufficiency. The process evaluation was carried out through continuous data collection throughout the project (2012-2014), resulting in a total of 28 individual interviews and 17 focus groups with officials and managers. The material was categorized through an inductive content analysis, and analyzed using social capital as a theoretical frame. The evaluation points to how issues related to design, organization and management contributed to the project not reaching its goals, e.g. problems with recruitment of participants, the funding structure, and staffing problems on the managerial level. Still, officials reported positive effects of close cooperation, which was perceived as facilitating the case management by fostering a mutual understanding and access to resources and rehabilitation measures from more than one authority. Cooperative work combined with the use of MI and flexible case management seem to promote an increased trust between officials from different authorities and participants, which in the study is conceptualized as bonding and bridging social capital (between officials) and linking social capital (between officials and participants). The organizational problems combined with the relatively large differences in approaches between the project and regular practice obstructed implementation, where the authorities involved did not appear

  17. Process evaluation of an interorganizational cooperation initiative in vocational rehabilitation: the Dirigo project

    Directory of Open Access Journals (Sweden)

    Christian Ståhl

    2017-05-01

    Full Text Available Abstract Background This study analyzes the process of establishing and developing a cooperative vocational rehabilitation project with special focus on organizational and professional aspects. In the project, officials from the Swedish Social Insurance Agency and the Swedish Public Employment Service worked cooperatively with participants on long-term sick leave, youths with disability benefits, and people receiving social allowances. The officials used Motivational Interviewing (MI as a method when meeting participants, and were able to offer flexible and tailored case management. The goal was to improve work ability and promote self-sufficiency. Methods The process evaluation was carried out through continuous data collection throughout the project (2012–2014, resulting in a total of 28 individual interviews and 17 focus groups with officials and managers. The material was categorized through an inductive content analysis, and analyzed using social capital as a theoretical frame. Results The evaluation points to how issues related to design, organization and management contributed to the project not reaching its goals, e.g. problems with recruitment of participants, the funding structure, and staffing problems on the managerial level. Still, officials reported positive effects of close cooperation, which was perceived as facilitating the case management by fostering a mutual understanding and access to resources and rehabilitation measures from more than one authority. Conclusions Cooperative work combined with the use of MI and flexible case management seem to promote an increased trust between officials from different authorities and participants, which in the study is conceptualized as bonding and bridging social capital (between officials and linking social capital (between officials and participants. The organizational problems combined with the relatively large differences in approaches between the project and regular practice

  18. Project Interface Requirements Process Including Shuttle Lessons Learned

    Science.gov (United States)

    Bauch, Garland T.

    2010-01-01

    Most failures occur at interfaces between organizations and hardware. Processing interface requirements at the start of a project life cycle will reduce the likelihood of costly interface changes/failures later. This can be done by adding Interface Control Documents (ICDs) to the Project top level drawing tree, providing technical direction to the Projects for interface requirements, and by funding the interface requirements function directly from the Project Manager's office. The interface requirements function within the Project Systems Engineering and Integration (SE&I) Office would work in-line with the project element design engineers early in the life cycle to enhance communications and negotiate technical issues between the elements. This function would work as the technical arm of the Project Manager to help ensure that the Project cost, schedule, and risk objectives can be met during the Life Cycle. Some ICD Lessons Learned during the Space Shuttle Program (SSP) Life Cycle will include the use of hardware interface photos in the ICD, progressive life cycle design certification by analysis, test, & operations experience, assigning interface design engineers to Element Interface (EI) and Project technical panels, and linking interface design drawings with project build drawings

  19. Charge exchange processes involving iron ions

    International Nuclear Information System (INIS)

    Phaneuf, R.A.

    1985-01-01

    A review and evaluation is given of the experimental data which are available for charge exchange processes involving iron ions and neutral H, H 2 and He. Appropriate scaling laws are presented, and their accuracy estimated for these systems. A bibliography is given of available data sources, as well as of useful data compilations and review articles. A procedure is recommended for providing single approximate formulae to the fusion community to describe total cross sections for electron capture by partially-stripped Fe/sup q+/ ions in collisions with H, H 2 and He, based on the scaling relationships suggested by Janev and Hvelplund

  20. Use of GIS technologies to facilitate the transportation project programming process.

    Science.gov (United States)

    2008-05-01

    Transportation project programming in a transportation agency is a process of matching : potential projects with available funds to accomplish the agencys mission and goals of a : given period of time. Result of this process is normally a transpor...

  1. Process for planning and control of software projects using XedroGESPRO

    OpenAIRE

    Jacqueline Marín-Sánchez; José Alejandro Lugo-García; Pedro Yobanis Piñero-Pérez; Alena María Santiesteban-García; Félix Noel Abelardo-Santana; Javier Menéndez-Rizo

    2014-01-01

    The software project management in Cuba has become a key area for improving production processes and decisionmaking in organizations. Several models and standards for process improvement, related with project management, proposed best practices on issues of planning and control of projects. However, they are generic guidelines that describe only those activities to execute, leaving the responsibility for implementing to organizations, using sometimes , expensive proprietary infor...

  2. STAKEHOLDER INVOLVEMENT IN THE HEALTH TECHNOLOGY ASSESSMENT PROCESS IN LATIN AMERICA.

    Science.gov (United States)

    Pichon-Riviere, Andres; Soto, Natalie; Augustovski, Federico; Sampietro-Colom, Laura

    2018-06-11

    Latin American countries are taking important steps to expand and strengthen universal health coverage, and health technology assessment (HTA) has an increasingly prominent role in this process. Participation of all relevant stakeholders has become a priority in this effort. Key issues in this area were discussed during the 2017 Latin American Health Technology Assessment International (HTAi) Policy Forum. The Forum included forty-one participants from Latin American HTA agencies; public, social security, and private insurance sectors; and the pharmaceutical and medical device industry. A background paper and presentations by invited experts and Forum members supported discussions. This study presents a summary of these discussions. Stakeholder involvement in HTA remains inconsistently implemented in the region and few countries have established formal processes. Participants agreed that stakeholder involvement is key to improve the HTA process, but the form and timing of such improvements must be adapted to local contexts. The legitimization of both HTA and decision-making processes was identified as one of the main reasons to promote stakeholder involvement; but to be successful, the entire system of assessment and decision making must be properly staffed and organized, and certain basic conditions must be met, including transparency in the HTA process and a clear link between HTA and decision making. Participants suggested a need for establishing clear rules of participation in HTA that would protect HTA producers and decision makers from potentially distorting external influences. Such rules and mechanisms could help foster trust and credibility among stakeholders, supporting actual involvement in HTA processes.

  3. Risk Factors in ERP Implementation Projects for Process Oriented

    Directory of Open Access Journals (Sweden)

    Andrzej Partyka

    2009-09-01

    Full Text Available This paper present review and analysis of risk factors, which could affect successful implementation of ERP system, for project performed in project oriented organizations. Presented risk breakdown structure and the list of common risk factors, are well-suited for ERP implementation projects. Considered risk categories allow for complex risk analysis. Additionally, mapping of risk importance for particular implementation phases is presented. Making presented model an important input for project risk management process, especially for the beginning phases which require identification of risk factors.

  4. Has patients' involvement in the decision-making process changed over time?

    NARCIS (Netherlands)

    Brink-Muinen, A. van den; Dulmen, A.M. van; Haes, H.C.J.M. de; Visser, A.P.; Schellevis, F.G.; Bensing, J.M.

    2006-01-01

    Objective: To get insight into the changes over time of patients' involvement in the decision-making process, and into the factors contributing to patients' involvement and general practitioners' (GPs) communication related to the Medical Treatment Act (MTA) Issues: information about treatment,

  5. Has patients’ involvement in the decision-making process changed over time?

    NARCIS (Netherlands)

    Brink-Muinen, A. van den; Dulmen, S.M. van; Haes, H.C.J.M. de; Visser, A.P.; Schellevis, F.G.; Bensing, J.

    2006-01-01

    Objective To get insight into the changes over time of patients’ involvement in the decision-making process, and into the factors contributing to patients’ involvement and general practitioners’ (GPs) communication related to the Medical Treatment Act (MTA) issues: information about treatment,

  6. A rural community's involvement in the design and usability testing of a computer-based informed consent process for the Personalized Medicine Research Project.

    Science.gov (United States)

    Mahnke, Andrea N; Plasek, Joseph M; Hoffman, David G; Partridge, Nathan S; Foth, Wendy S; Waudby, Carol J; Rasmussen, Luke V; McManus, Valerie D; McCarty, Catherine A

    2014-01-01

    Many informed consent studies demonstrate that research subjects poorly retain and understand information in written consent documents. Previous research in multimedia consent is mixed in terms of success for improving participants' understanding, satisfaction, and retention. This failure may be due to a lack of a community-centered design approach to building the interventions. The goal of this study was to gather information from the community to determine the best way to undertake the consent process. Community perceptions regarding different computer-based consenting approaches were evaluated, and a computer-based consent was developed and tested. A second goal was to evaluate whether participants make truly informed decisions to participate in research. Simulations of an informed consent process were videotaped to document the process. Focus groups were conducted to determine community attitudes towards a computer-based informed consent process. Hybrid focus groups were conducted to determine the most acceptable hardware device. Usability testing was conducted on a computer-based consent prototype using a touch-screen kiosk. Based on feedback, a computer-based consent was developed. Representative study participants were able to easily complete the consent, and all were able to correctly answer the comprehension check questions. Community involvement in developing a computer-based consent proved valuable for a population-based genetic study. These findings may translate to other types of informed consents, including those for trials involving treatment of genetic disorders. A computer-based consent may serve to better communicate consistent, clear, accurate, and complete information regarding the risks and benefits of study participation. Additional analysis is necessary to measure the level of comprehension of the check-question answers by larger numbers of participants. The next step will involve contacting participants to measure whether understanding of

  7. IP FUNMIG: The European far-field project

    International Nuclear Information System (INIS)

    Kienzler, B.; Buckau, G.

    2007-01-01

    The fundamental processes of radionuclide migration (the FUNMIG) is the subject matter for the Integral Project in terms of the European Commission 6-th Frame Programme (the FP6). Within the frameworks of the Project one focuses on the processes of the hot radionuclide interaction with various rocks associated with the migration of the hot radionuclides from the deep underground storage. Paper describes the Project objectives, arrangement and implementation. One highlights the German involvement in the Project [ru

  8. Process improvement : the creation and evaluation of process alternatives

    NARCIS (Netherlands)

    Netjes, M.

    2010-01-01

    Companies continuously strive to improve their processes to increase productivity and delivered quality against lower costs. With Business Process Redesign (BPR) projects such improvement goals can be achieved. BPR involves the restructuring of business processes, stimulated by the application of

  9. Issues and measures in the design process from the perspective of risk management of construction projects. study of power plant construction projects accident cases

    International Nuclear Information System (INIS)

    Iwahara, Hirohiko; Shiraki, Wataru; Inomo, Hitoshi; Hasegawa, Syuichi

    2015-01-01

    Construction of power plants, foundation work, consisting of a wide variety of construction work, such as plant equipment work. And, civil engineering, technician electrical such as different engineering field, is a comprehensive construction project that works for the design conditions of the structure. However, if the cooperation design conditions is not sufficient, as a construction project, the optimal structures may not be said to have been built. As a result, total cost or increased, including the initial cost of the end construction projects, it is be a cause of the accident. Previous studies, plant equipment construction, is related to safety management and risk of foundation work such as individual construction were many. In this paper, as an example the power plant construction, and performs the following discussion from the point of view of risk management of large-scale construction projects that these individual construction work together with each other. The importance of design conditions cooperation, (1) 'Challenges and countermeasures of ordering method of construction projects', to verify from the (2) 'actually happened substation foundation displacement accident'. And on whether or not the construction project order institutions can be involved in the design from the site preparation stage, we study (3) for 'construction work scope and risk control the construction project ordering institutions to implement' the risk to the natural disaster (earthquake). From these, we describe the challenges and measures in the construction project of the design process. (author)

  10. The Plasma Hearth Process Technology Development Project

    International Nuclear Information System (INIS)

    Geimer, R.; Batdorf, J.; Wolfe, P.

    1993-01-01

    The US DOE Office of Technology Development (OTD) is currently evaluating the Plasma Hearth Process (PHP) for potential treatment of several DOE waste types. The PHP is a high-temperature vitrification process that has potential application for a wide range of mixed waste types in both the low-level and transuranic mixed waste categories. The PHP is being tested under both the OTD Mixed Waste Integrated Program and the Buried Waste Integrated Demonstration. Initial testing has been completed on several different surrogate waste forms that are representative of some of the DOE mixed waste streams. Destruction of organic material exceeds that of conventional incineration technologies. The vitrified residual has leaching characteristics comparable to glass formulations produced in the high-level waste program. The first phase of the PHP demonstration project has been successfully completed, and the project is currently beginning a comprehensive second phase of development and testing

  11. UMTRA Ground Water Project management action process document

    International Nuclear Information System (INIS)

    1996-03-01

    A critical U.S. Department of Energy (DOE) mission is to plan, implement, and complete DOE Environmental Restoration (ER) programs at facilities that were operated by or in support of the former Atomic Energy Commission (AEC). These facilities include the 24 inactive processing sites the Uranium Mill Tailings Radiation Control Act (UMTRCA) (42 USC Section 7901 et seq.) identified as Title I sites, which had operated from the late 1940s through the 1970s. In UMTRCA, Congress acknowledged the potentially harmful health effects associated with uranium mill tailings and directed the DOE to stabilize, dispose of, and control the tailings in a safe and environmentally sound manner. The UMTRA Surface Project deals with buildings, tailings, and contaminated soils at the processing sites and any associated vicinity properties (VP). Surface remediation at the processing sites will be completed in 1997 when the Naturita, Colorado, site is scheduled to be finished. The UMTRA Ground Water Project was authorized in an amendment to the UMTRCA (42 USC Section 7922(a)), when Congress directed DOE to comply with U.S. Environmental Protection Agency (EPA) ground water standards. The UMTRA Ground Water Project addresses any contamination derived from the milling operation that is determined to be present at levels above the EPA standards

  12. Baseline process description for simulating plutonium oxide production for precalc project

    Energy Technology Data Exchange (ETDEWEB)

    Pike, J. A. [Savannah River Site (SRS), Aiken, SC (United States). Savannah River National Lab. (SRNL)

    2017-10-26

    Savannah River National Laboratory (SRNL) started a multi-year project, the PreCalc Project, to develop a computational simulation of a plutonium oxide (PuO2) production facility with the objective to study the fundamental relationships between morphological and physicochemical properties. This report provides a detailed baseline process description to be used by SRNL personnel and collaborators to facilitate the initial design and construction of the simulation. The PreCalc Project team selected the HB-Line Plutonium Finishing Facility as the basis for a nominal baseline process since the facility is operational and significant model validation data can be obtained. The process boundary as well as process and facility design details necessary for multi-scale, multi-physics models are provided.

  13. Project Management Personnel Competencies Evaluation

    Directory of Open Access Journals (Sweden)

    Paul POCATILU

    2006-01-01

    Full Text Available An important factor for the success management of IT projects is the human resource. People involved in the project management process have to be evaluated. In order to do that, same criteria has to be specified. This paper describes some aspects regarding the personnel evaluation.

  14. Investigating Individuals' Intention to be Involved in Knowledge Management Process

    OpenAIRE

    M. J.M. Razi; N. S.A. Karim

    2011-01-01

    Problem statement: Implementation of Knowledge Management (KM) process in organizations is considered as essential to be competitive in the present competitive world. Though the modern KM practices highly depend on technology, individuals (organizational members) intention to be involved in KM process plays a major role in the success. Hence, the evaluation of individuals intention is deemed as significant before the actual implementation of KM process in organizations. Nevertheless, inadequa...

  15. 44 CFR 78.10 - Project grant approval process.

    Science.gov (United States)

    2010-10-01

    ..., DEPARTMENT OF HOMELAND SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD MITIGATION ASSISTANCE § 78.10 Project grant approval process. The State POC will solicit applications from...

  16. UMTRA Surface Project management action process document: Final. Revision 2

    International Nuclear Information System (INIS)

    1996-06-01

    Title 1 of the UMTRCA authorized the DOE to undertake remedial actions at these designed sites and associated vicinity properties (VP), which contain uranium mill tailings and other residual radioactive materials (RRM) derived from the processing sites. Title 2 of the UMTRCA addresses uranium mill sites that were licensed at the time the UMTRCA was enacted. Cleanup of these Title 2 sites is the responsibility of the licensees. The cleanup of the Title 1 sites has been split into two separate projects: the Surface Project, which deals with the mill buildings, tailings, and contaminated soils at the sites and VPs; and the Ground Water Project, which is limited to the contaminated ground water at the sites. This management action process (MAP) document discusses the Uranium Mill Tailings Remedial Action (UMTRA) Surface Project. Since its inception through March 1996, the Surface Project (hereinafter called the Project) has cleaned up 16 of the 24 designated processing sites and approximately 5,000 VPs, reducing the risk to human health and the environment posed by the uranium mill tailings. Two of the 24 sites, Belfield and Bowman, North Dakota, will not be remediated at the request of the state, reducing the total number of sites to 22. By the start of FY1998, the remaining 6 processing sites and associated VPs will be cleaned up. The remedial action activities to be funded in FY1998 by the FY1998 budget request are remediation of the remaining Grand Junction, Colorado, VPs; closure of the Cheney disposal cell in Grand Junction, Colorado; and preparation of the completion reports for 4 completed sites

  17. UMTRA Surface Project management action process document: Final. Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-06-01

    Title 1 of the UMTRCA authorized the DOE to undertake remedial actions at these designed sites and associated vicinity properties (VP), which contain uranium mill tailings and other residual radioactive materials (RRM) derived from the processing sites. Title 2 of the UMTRCA addresses uranium mill sites that were licensed at the time the UMTRCA was enacted. Cleanup of these Title 2 sites is the responsibility of the licensees. The cleanup of the Title 1 sites has been split into two separate projects: the Surface Project, which deals with the mill buildings, tailings, and contaminated soils at the sites and VPs; and the Ground Water Project, which is limited to the contaminated ground water at the sites. This management action process (MAP) document discusses the Uranium Mill Tailings Remedial Action (UMTRA) Surface Project. Since its inception through March 1996, the Surface Project (hereinafter called the Project) has cleaned up 16 of the 24 designated processing sites and approximately 5,000 VPs, reducing the risk to human health and the environment posed by the uranium mill tailings. Two of the 24 sites, Belfield and Bowman, North Dakota, will not be remediated at the request of the state, reducing the total number of sites to 22. By the start of FY1998, the remaining 6 processing sites and associated VPs will be cleaned up. The remedial action activities to be funded in FY1998 by the FY1998 budget request are remediation of the remaining Grand Junction, Colorado, VPs; closure of the Cheney disposal cell in Grand Junction, Colorado; and preparation of the completion reports for 4 completed sites.

  18. A Systematic Approach to Modelling Change Processes in Construction Projects

    Directory of Open Access Journals (Sweden)

    Ibrahim Motawa

    2012-11-01

    Full Text Available Modelling change processes within construction projects isessential to implement changes efficiently. Incomplete informationon the project variables at the early stages of projects leads toinadequate knowledge of future states and imprecision arisingfrom ambiguity in project parameters. This lack of knowledge isconsidered among the main source of changes in construction.Change identification and evaluation, in addition to predictingits impacts on project parameters, can help in minimising thedisruptive effects of changes. This paper presents a systematicapproach to modelling change process within construction projectsthat helps improve change identification and evaluation. Theapproach represents the key decisions required to implementchanges. The requirements of an effective change processare presented first. The variables defined for efficient changeassessment and diagnosis are then presented. Assessmentof construction changes requires an analysis for the projectcharacteristics that lead to change and also analysis of therelationship between the change causes and effects. The paperconcludes that, at the early stages of a project, projects with a highlikelihood of change occurrence should have a control mechanismover the project characteristics that have high influence on theproject. It also concludes, for the relationship between changecauses and effects, the multiple causes of change should bemodelled in a way to enable evaluating the change effects moreaccurately. The proposed approach is the framework for tacklingsuch conclusions and can be used for evaluating change casesdepending on the available information at the early stages ofconstruction projects.

  19. Involving stakeholders in the commissioning and implementation of fishery science projects: experiences from the U.K. Fisheries Science Partnership.

    Science.gov (United States)

    Armstrong, M J; Payne, A I L; Deas, B; Catchpole, T L

    2013-10-01

    Following from similar initiatives worldwide, the U.K.'s Fisheries Science Partnership (FSP) was established in 2003 to provide the fishing industry with opportunities to propose and participate in scientific studies in collaboration with fishery scientists. Key concepts were that most of the available funding would support industry participation, that industry, not scientists, would come up with the ideas for projects, and that commercial fishing vessels and fishing methods would be used to address specific concerns of the fishing industry in a scientifically controlled manner. Nearly 100 projects had been commissioned by March 2012, covering annual time-series surveys of stocks subject to traditional assessment, and ad hoc projects on, e.g. gear selectivity, discard survival, tagging and migration and fishery development. The extent to which the results of the projects have been used by stakeholders, fishery scientists and fishery managers at a national and E.U. level is evaluated, along with the degree of industry interest and involvement, and reasons are identified for successes or failures in the uptake of the results into management and policy. Finally, the question is posed whether the programme has been successful in improving the engagement of the fishing community in the science-management process and in fostering communication and greater trust between fishers, scientists and managers. © 2013 Crown Copyright. © 2013 The Fisheries Society of the British Isles.

  20. What Goes Around: the process of building a community-based harm reduction research project.

    Science.gov (United States)

    Jalloh, Chelsea; Illsley, Shohan; Wylie, John; Migliardi, Paula; West, Ethan; Stewart, Debbie; Mignone, Javier

    2017-11-16

    Often, research takes place on underserved populations rather than with underserved populations. This approach can further isolate and stigmatize groups that are already made marginalized. What Goes Around is a community-based research project that was led by community members themselves (Peers). This research aimed to implement a community-based research methodology grounded in the leadership and growing research capacity of community researchers and to investigate a topic which community members identified as important and meaningful. Chosen by community members, this project explored how safer sex and safer drug use information is shared informally among Peers. Seventeen community members actively engaged as both community researchers and research participants throughout all facets of the project: inception, implementation, analysis, and dissemination of results. Effective collaboration between community researchers, a community organization, and academics facilitated a research process in which community members actively guided the project from beginning to end. The methods used in What Goes Around demonstrated that it is not only possible, but advantageous, to draw from community members' involvement and direction in all stages of a community-based research project. This is particularly important when working with a historically underserved population. Purposeful and regular communication among collaborators, ongoing capacity building, and a commitment to respect the experience and expertise of community members were essential to the project's success. This project demonstrated that community members are highly invested in both informally sharing information about safer sex and safer drug use and taking leadership roles in directing research that prioritizes harm reduction in their communities.

  1. Improving Immunization Rates Using Lean Six Sigma Processes: Alliance of Independent Academic Medical Centers National Initiative III Project.

    Science.gov (United States)

    Hina-Syeda, Hussaini; Kimbrough, Christina; Murdoch, William; Markova, Tsveti

    2013-01-01

    Quality improvement education and work in interdisciplinary teams is a healthcare priority. Healthcare systems are trying to meet core measures and provide excellent patient care, thus improving their Hospital Consumer Assessment of Healthcare Providers & Systems scores. Crittenton Hospital Medical Center in Rochester Hills, MI, aligned educational and clinical objectives, focusing on improving immunization rates against pneumonia and influenza prior to the rates being implemented as core measures. Improving immunization rates prevents infections, minimizes hospitalizations, and results in overall improved patient care. Teaching hospitals offer an effective way to work on clinical projects by bringing together the skill sets of residents, faculty, and hospital staff to achieve superior results. WE DESIGNED AND IMPLEMENTED A STRUCTURED CURRICULUM IN WHICH INTERDISCIPLINARY TEAMS ACQUIRED KNOWLEDGE ON QUALITY IMPROVEMENT AND TEAMWORK, WHILE FOCUSING ON A SPECIFIC CLINICAL PROJECT: improving global immunization rates. We used the Lean Six Sigma process tools to quantify the initial process capability to immunize against pneumococcus and influenza. The hospital's process to vaccinate against pneumonia overall was operating at a Z score of 3.13, and the influenza vaccination Z score was 2.53. However, the process to vaccinate high-risk patients against pneumonia operated at a Z score of 1.96. Improvement in immunization rates of high-risk patients became the focus of the project. After the implementation of solutions, the process to vaccinate high-risk patients against pneumonia operated at a Z score of 3.9 with a defects/million opportunities rate of 9,346 and a yield of 93.5%. Revisions to the adult assessment form fixed 80% of the problems identified. This process improvement project was not only beneficial in terms of improved quality of patient care but was also a positive learning experience for the interdisciplinary team, particularly for the residents. The

  2. Accumulating project management knowledge through process theory

    NARCIS (Netherlands)

    Niederman, Fred; March, Salvatore T.; Mueller, Benjamin

    2014-01-01

    This paper describes how the general notion of process theory can provide a foundational component in a portfolio of project management theories. The paper begins by outlining a variety of views pertaining to the nature of theory and theory development. This forms a basis for understanding how

  3. Statistical Process Control. A Summary. FEU/PICKUP Project Report.

    Science.gov (United States)

    Owen, M.; Clark, I.

    A project was conducted to develop a curriculum and training materials to be used in training industrial operatives in statistical process control (SPC) techniques. During the first phase of the project, questionnaires were sent to 685 companies (215 of which responded) to determine where SPC was being used, what type of SPC firms needed, and how…

  4. Qualified public involvement in the decision making process of siting a waste repository

    International Nuclear Information System (INIS)

    Rodrigues, Danielle Monegalha; Almeida, Ivan Pedro Salati de

    2009-01-01

    The main objective of this paper is to identify the most important characteristics required for the qualification of local communities for participating in the process of defining a specific site for a radioactive waste repository. It also compares the strategies used by Hungary, United Kingdom and Belgium to stimulate the public participation in the decision-making process of building and operating a radioactive waste repository, considering both the stepwise process and the spontaneous candidacy. Two main aspects are discussed as prerequisites to constitute a qualified public. The first aspect is how well the person or entity can be considered an effective representative of the community affected by the repository. This means the conditions the representative has to speak on behalf of the community and participate in the decision making process as its voice. The second characteristic is the level and quality of the information that the community and its representatives must have to participate actively in the decision-making process and what can be done to improve this status. Referring to the strategy to public involvement, this paper discusses the importance of transparency in the process, aiming the credibility of the entrepreneur as the first pace to gaining the confidence of the public affected by the project. Implementing an open dialog and listening to the needs and claims of the population are the first steps to being accepted as a true partner of the community. Preliminary discussions and explanations are important to introduce the subject and to reduce beliefs of false threats in the affected community. The constitution of a local committee is suggested, to act as a legal and formal channel to facilitate the partnership between local community, neighbors and the entrepreneur in order to achieve a positive result in the whole process. (author)

  5. The TOPOMOD-ITN project: unravel the origin of Earth's topography from modelling deep-surface processes

    Science.gov (United States)

    Faccenna, C.; Funiciello, F.

    2012-04-01

    EC-Marie Curie Initial Training Networks (ITN) projects aim to improve the career perspectives of young generations of researchers. Institutions from both academic and industry sectors form a collaborative network to recruit research fellows and provide them with opportunities to undertake research in the context of a joint research training program. In this frame, TOPOMOD - one of the training activities of EPOS, the new-born European Research Infrastructure for Geosciences - is a funded ITN project designed to investigate and model how surface processes interact with crustal tectonics and mantle convection to originate and develop topography of the continents over a wide range of spatial and temporal scales. The multi-disciplinary approach combines geophysics, geochemistry, tectonics and structural geology with advanced geodynamic numerical/analog modelling. TOPOMOD involves 8 European research teams internationally recognized for their excellence in complementary fields of Earth Sciences (Roma TRE, Utrecht, GFZ, ETH, Cambridge, Durham, Rennes, Barcelona), to which are associated 5 research institutions (CNR-Italy, Univ. Parma, Univ. Lausanne, Univ. Montpellier, Univ. Mainz) , 3 high-technology enterprises (Malvern Instruments, TNO, G.O. Logical Consulting) and 1 large multinational oil and gas company (ENI). This unique network places emphasis in experience-based training increasing the impact and international visibility of European research in modeling. Long-term collaboration and synergy are established among the overmentioned research teams through 15 cross-disciplinary research projects that combine case studies in well-chosen target areas from the Mediterranean, the Middle and Far East, west Africa, and South America, with new developments in structural geology, geomorphology, seismology, geochemistry, InSAR, laboratory and numerical modelling of geological processes from the deep mantle to the surface. These multidisciplinary projects altogether aim to

  6. EMPRESS: A European Project to Enhance Process Control Through Improved Temperature Measurement

    Science.gov (United States)

    Pearce, J. V.; Edler, F.; Elliott, C. J.; Rosso, L.; Sutton, G.; Andreu, A.; Machin, G.

    2017-08-01

    A new European project called EMPRESS, funded by the EURAMET program `European Metrology Program for Innovation and Research,' is described. The 3 year project, which started in the summer of 2015, is intended to substantially augment the efficiency of high-value manufacturing processes by improving temperature measurement techniques at the point of use. The project consortium has 18 partners and 5 external collaborators, from the metrology sector, high-value manufacturing, sensor manufacturing, and academia. Accurate control of temperature is key to ensuring process efficiency and product consistency and is often not achieved to the level required for modern processes. Enhanced efficiency of processes may take several forms including reduced product rejection/waste; improved energy efficiency; increased intervals between sensor recalibration/maintenance; and increased sensor reliability, i.e., reduced amount of operator intervention. Traceability of temperature measurements to the International Temperature Scale of 1990 (ITS-90) is a critical factor in establishing low measurement uncertainty and reproducible, consistent process control. Introducing such traceability in situ (i.e., within the industrial process) is a theme running through this project.

  7. BIM-based Multiuser Collaborative Virtual Environments for end user involvement

    DEFF Research Database (Denmark)

    Sørensen, Jesper Bendix; Svidt, Kjeld

    2017-01-01

    This paper examines the potential of utilizing virtual mock-ups in end user involvement processes. To access if virtual mock-ups can optimize existing processes, current workflows using physical full-scale mock-ups on several projects are explored. Requirements regarding the traditional workflows...

  8. Design of remote handled process assemblies for the process facility modifications project

    International Nuclear Information System (INIS)

    Smets, J.L.; Ajifu, D.A.

    1987-01-01

    The modular design philosophy for the process facility modification project utilizes an integrated design of components to facilitate operations and maintenance of nuclear fuel reprocessing equipment in a hot cell environment. The utilization of a matrix of remoteable base frames combines with process equipment designed as remote assemblies and sub-assemblies has simplified the overall design. Modularity will allow future flexibility while providing advantages for construction and maintenance in the initial installation

  9. Sum rules and other properties involving resonance projection operators. [for optical potential description of electron scattering from atoms and ions

    Science.gov (United States)

    Berk, A.; Temkin, A.

    1985-01-01

    A sum rule is derived for the auxiliary eigenvalues of an equation whose eigenspectrum pertains to projection operators which describe electron scattering from multielectron atoms and ions. The sum rule's right-hand side depends on an integral involving the target system eigenfunctions. The sum rule is checked for several approximations of the two-electron target. It is shown that target functions which have a unit eigenvalue in their auxiliary eigenspectrum do not give rise to well-defined projection operators except through a limiting process. For Hylleraas target approximations, the auxiliary equations are shown to contain an infinite spectrum. However, using a Rayleigh-Ritz variational principle, it is shown that a comparatively simple aproximation can exhaust the sum rule to better than five significant figures. The auxiliary Hylleraas equation is greatly simplified by conversion to a square root equation containing the same eigenfunction spectrum and from which the required eigenvalues are trivially recovered by squaring.

  10. Involving patients in health technology funding decisions: stakeholder perspectives on processes used in Australia.

    Science.gov (United States)

    Lopes, Edilene; Street, Jackie; Carter, Drew; Merlin, Tracy

    2016-04-01

    Governments use a variety of processes to incorporate public perspectives into policymaking, but few studies have evaluated these processes from participants' point of view. The objective of this study was twofold: to understand the perspectives of selected stakeholders with regard to involvement processes used by Australian Advisory Committees to engage the public and patients; and to identify barriers and facilitators to participation. Twelve semi-structured interviews were conducted with representatives of different stakeholder groups involved in health technology funding decisions in Australia. Data were collected and analysed using a theoretical framework created by Rowe and Frewer, but adapted to more fully acknowledge issues of power and influence. Stakeholder groups disagreed as to what constitutes effective and inclusive patient involvement. Barriers reported by interviewees included poor communication, a lack of transparency, unworkable deadlines, and inadequate representativeness. Also described were problems associated with defining the task for patients and their advocates and with the timing of patient input in the decision-making process. Interviewees suggested that patient participation could be improved by increasing the number of patient organizations engaged in processes and including those organizations at different stages of decision making, especially earlier. The different evaluations made by stakeholder groups appear to be underpinned by contrasting conceptions of public involvement and its value, in line with Graham Martin's work which distinguishes between 'technocratic' and 'democratic' public involvement. Understanding stakeholders' perspectives and the contrasting conceptions of public involvement could foster future agreement on which processes should be used to involve the public in decision making. © 2015 John Wiley & Sons Ltd.

  11. Project management plan, Waste Receiving and Processing Facility, Module 1, Project W-026

    Energy Technology Data Exchange (ETDEWEB)

    Starkey, J.G.

    1993-05-01

    The Hanford Waste Receiving and Processing Facility Module 1 Project (WRAP 1) has been established to support the retrieval and final disposal of approximately 400K grams of plutonium and quantities of hazardous components currently stored in drums at the Hanford Site.

  12. Project management plan, Waste Receiving and Processing Facility, Module 1, Project W-026

    International Nuclear Information System (INIS)

    Starkey, J.G.

    1993-05-01

    The Hanford Waste Receiving and Processing Facility Module 1 Project (WRAP 1) has been established to support the retrieval and final disposal of approximately 400K grams of plutonium and quantities of hazardous components currently stored in drums at the Hanford Site

  13. Functional brain imaging study on brain processes involved in visual awareness

    International Nuclear Information System (INIS)

    Kobayashi, Tetsuo; Futakawa, Hiroyuki; Tokita, Shohko; Jung, Jiuk

    2003-01-01

    Recently, there has been great interest in visual awareness because it is thought that it may provide valuable information in understanding aspects of consciousness. An important but still controversial issue is what region in the brain is involved in visual awareness. When viewing ambiguous figures, observers can be aware of only one of multiple competing percepts at any given moment, but experience spontaneous alternations among the percepts over time. This phenomenon is known as multistable perceptions and thought to be essential in understanding the brain processes involved in visual awareness. We used functional magnetic resonance imaging to investigate the brain activities associated with multistable perceptions. Two separate experiments were performed based on two different multistable phenomena known as binocular rivalry and perceptions of ambiguous figures. Significant differential activations in the parietal and prefrontal areas were commonly observed under multistable conditions compared to monostable control conditions in the two separate experiments. These findings suggest that neural processes in the parietal and prefrontal areas may be involved in perceptual alternations in situations involving multistable phenomena. (author)

  14. Process evaluation of the project P.A.T.H.S. (secondary 2 program): findings based on the co-walker scheme.

    Science.gov (United States)

    Shek, Daniel T L; Tam, Suet-yan

    2009-01-01

    To understand the implementation quality of the Tier 1 Program (Secondary 2 Curriculum) of the P.A.T.H.S. Project, process evaluation was carried out by co-walkers through classroom observation of 195 units in 131 schools. Results showed that the overall level of program adherence was generally high with an average of 84.55%, and different factors of the implementation process were evaluated as positive. Quality of program implementation and achievement of program objectives were predicted by students' participation and involvement, strategies to enhance students' motivation, opportunity for reflection, time management, and class preparation. Success in program implementation was predicted by students' participation and involvement, classroom control, interactive delivery method, strategies to enhance students' motivation, opportunity for reflection, and lesson preparation.

  15. A process dissociation approach to objective-projective test score interrelationships.

    Science.gov (United States)

    Bornstein, Robert F

    2002-02-01

    Even when self-report and projective measures of a given trait or motive both predict theoretically related features of behavior, scores on the 2 tests correlate modestly with each other. This article describes a process dissociation framework for personality assessment, derived from research on implicit memory and learning, which can resolve these ostensibly conflicting results. Research on interpersonal dependency is used to illustrate 3 key steps in the process dissociation approach: (a) converging behavioral predictions, (b) modest test score intercorrelations, and (c) delineation of variables that differentially affect self-report and projective test scores. Implications of the process dissociation framework for personality assessment and test development are discussed.

  16. Orienting and Onboarding Clinical Nurse Specialists: A Process Improvement Project.

    Science.gov (United States)

    Garcia, Mayra G; Watt, Jennifer L; Falder-Saeed, Karie; Lewis, Brennan; Patton, Lindsey

    Clinical nurse specialists (CNSs) have a unique advanced practice role. This article describes a process useful in establishing a comprehensive orientation and onboarding program for a newly hired CNS. The project team used the National Association of Clinical Nurse Specialists core competencies as a guide to construct a process for effectively onboarding and orienting newly hired CNSs. Standardized documents were created for the orientation process including a competency checklist, needs assessment template, and professional evaluation goals. In addition, other documents were revised to streamline the orientation process. Standardizing the onboarding and orientation process has demonstrated favorable results. As of 2016, 3 CNSs have successfully been oriented and onboarded using the new process. Unique healthcare roles require special focus when onboarding and orienting into a healthcare system. The use of the National Association of Clinical Nurse Specialists core competencies guided the project in establishing a successful orientation and onboarding process for newly hired CNSs.

  17. EARLY READING ASSESSMENT INSTRUMENTS: ABILITIES AND PROCESSES INVOLVED

    Directory of Open Access Journals (Sweden)

    Ana Cláudia de Souza

    2017-04-01

    Full Text Available This study investigates the following early reading assessment instruments: “Bateria de Recepção e Produção da Linguagem Verbal” (SCLIAR-CABRAL, 2003a and “Teste de Competência de Leitura de Palavras e Pseudopalavras” (SEABRA; CAPOVILLA, 2010. The main research goal is to analyze in each one of these reading assessment instruments some of the multiple cognitive processes and basic low-level abilities involved in reading. In this sense, decoding, word recognition, lexical access, syntactic and textual processing, and comprehension are the cognitive processes taken into account. With regard to the basic reading abilities, accuracy and fluency (rhythm, prosody and speed are considered. The results indicate that each one of the analyzed reading assessment instruments assesses different aspects of the reading processes and abilities, mainly through off-line measures. ScliarCabral’s assessment battery allows the researcher or the teacher to evaluate the following processes: perception of the grapheme opposition in minimal pairs of words and in sentences, difficulties in sentence processing, skills in decoding the graphemic-phonemic relationship, and textual comprehension. In its turn, the reading assessment instrument proposed by Seabra e Capovilla allows one to evaluate student’s reading development level, by classifying the kind of processing as logographic, alphabetic or orthographic.

  18. Interim report for the project 'Competitive Food Processing in Norway' (NFR no 178280); Midtveis rapport for NFR prosjekt 178280

    Energy Technology Data Exchange (ETDEWEB)

    Nordtvedt, Tom Staale

    2009-05-15

    The report is an interim report for the project 'Competitive Food Processing in Norway' (NFR no 178280). It is part of a progress report of 1 June 2009. The project started in 2007. During this period a steering group has been established and 3 meetings have been organised. The Steering group represents different research and development organisations as well as the companies. Equipment for detection of ice fraction (several products) and core temperature has been developed in cooperation with Qvision. There is a strong commercial interest for equipment concerning core temperature. Application is linked to heating processes where an exact core temperature measurement e.g. for the production of sausages minimises energy consumption and increases the possibility of correct temperature measurement during the heating and cooling stages. Extensive testing has been carried out on chicken, salmon and cod in order to find the relation between super cooling methods and product quality. In this process cooperation has been established with equipment suppliers like Yara Praxair, Marel (Skaginn) and John Bean Technologies. The equipment is commercially available and the project has focused on adjusting for different products and comparison of methods. Also during this work the cooperation with representatives from the fisheries sector and the meat-processing industry has been advantageous. The project process requires close contact with all parties involved and project representatives participate in the further development of Nortura Steinkjaer's super cooling line as well as development and testing of Aker Seafood's lines for super-cooling of white-fish. The work is heavily integrated in other projects directed toward end-customers, while KMB Loennsom foredling has focused on in-plant super-cooling. The project follows it's schedule and no important corrections have been planned. (EW).

  19. Research Education: Perspectives and subjective processes involved in educational research

    Directory of Open Access Journals (Sweden)

    Harm H. Tillema

    2009-10-01

    Full Text Available Educational research acknowledges that researcher’s beliefs and training play a role in framing the outcomes of any study. Research not only consists of defining objectives and following certain methods (search but also of making decisions over the steps taking during the inquiry process (research.Establishing a conceptual framework to guide actions on the subjective processes in research is then crucial to control them. With that purpose in mind we offer researchers and Teacher Educators a heuristic tool to be conscious on the risks that can be taken when immersed in research interpretative process. This instrument could be utilised in PhD programs, masters and research projects.

  20. Ready to Retrofit: The Process of Project Team Selection, Building Benchmarking, and Financing Commercial Building Energy Retrofit Projects

    Energy Technology Data Exchange (ETDEWEB)

    Sanders, Mark D. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Parrish, Kristen [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Mathew, Paul [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2012-05-01

    This guide presents a process for three key activities for the building owner in preparing to retrofit existing commercial buildings: selecting project teams, benchmarking the existing building, and financing the retrofit work. Although there are other essential steps in the retrofit process, the three activities presented in this guide are the critical elements where the building owner has the greatest influence on the outcome of the project.

  1. The role of advocacy coalitions in a project implementation process: the example of the planning phase of the At Home/Chez Soi project dealing with homelessness in Montreal.

    Science.gov (United States)

    Fleury, Marie-Josée; Grenier, Guy; Vallée, Catherine; Hurtubise, Roch; Lévesque, Paul-André

    2014-08-01

    This study analyzed the planning process (summer 2008 to fall 2009) of a Montreal project that offers housing and community follow-up to homeless people with mental disorders, with or without substance abuse disorders. With the help of the Advocacy Coalition Framework (ACF), advocacy groups that were able to navigate a complex intervention implementation process were identified. In all, 25 people involved in the Montreal At Home/Chez Soi project were surveyed through interviews (n=18) and a discussion group (n=7). Participant observations and documentation (minutes and correspondence) were also used for the analysis. The start-up phase of the At Home/Chez may be broken down into three separate periods qualified respectively as "honeymoon;" "clash of cultures;" and "acceptance & commitment". In each of the planning phases of the At Home/Chez Soi project in Montreal, at least two advocacy coalitions were in confrontation about their specific belief systems concerning solutions to address the recurring homelessness social problem, while a third, more moderate one contributed in rallying most key actors under specified secondary aspects. The study confirms the importance of policy brokers in achieving compromises acceptable to all advocacy coalitions. Copyright © 2014 Elsevier Ltd. All rights reserved.

  2. The process of selecting technology development projects: a practical framework

    NARCIS (Netherlands)

    Herps, Joost M.J.; van Mal, Herman H.; Halman, Johannes I.M.; Martens, Jack H.M.; Borsboom, Ron H.M.

    2003-01-01

    In this article a practical framework is proposed, that can be used to organise the activities related to the selection-process of technology development projects. The framework is based upon recent literature and application at DAF Trucks Company. A technology development project has a long way to

  3. The process of selecting technology development projects : a practical framework

    NARCIS (Netherlands)

    Herps, J.M.J.; Mal, van H.H.; Halman, J.I.M.; Martens, J.H.M.; Borsboom, R.H.M.

    2003-01-01

    In this article a practical framework is proposed, that can be used to organise the activities related to the selection-process of technology development projects. The framework is based upon recent literature and application at DAF Trucks Company. A technology development project has a long way to

  4. Emission sensitization processes involving Nd{sup 3+} in YAG

    Energy Technology Data Exchange (ETDEWEB)

    Lupei, V., E-mail: lupei_voicu@yahoo.com [National Institute of Laser, Plasma and Radiation Physics, Bucharest 077125 (Romania); Lupei, A.; Gheorghe, C. [National Institute of Laser, Plasma and Radiation Physics, Bucharest 077125 (Romania); Ikesue, A. [World Lab. Co., Nagoya (Japan)

    2016-02-15

    The paper investigates the characteristics of sensitization processes of Nd{sup 3+} emission in YAG ceramics under broad band pumping by co-doping with Cr{sup 3+} and the prospect of using Nd{sup 3+} and Cr{sup 3+} for sensitization of emission of Yb{sup 3+}. It is evidenced that the energy transfer from Cr{sup 3+} to Nd{sup 3+} involves both direct and weak migration-assisted processes and is thus dependent on the concentrations of both species. It is also found that the ion–ion interaction responsible for the direct transfer contains besides the dipole–dipole coupling strong superexchange contribution that dominates the transfer to the Nd{sup 3+} ions up to the third coordination sphere and has major implication in sensitization. Investigation of (Cr, Nd, Yb)-doped YAG ceramics shows that Cr{sup 3+} can sensitize the emission of Yb{sup 3+} both via the chain Cr–Nd–Yb or by direct Cr–Yb energy transfer. The prospect of utilization of these processes in the solar-pumped laser is discussed. - Highlights: • The efficiency of sensitization increases at high Cr and Nd doping concentrations. • The Cr-to-Nd energy transfer involves both direct and migration-assisted processes. • The direct transfer implies both dipole–dipole and superexchange interactions. • The superexchange interaction has major influence on sensitization. • Sensitized emission of Yb{sup 3+} in (Cr,Nd,Yb):YAG by Cr–Nd–Yb and Cr–Yb transfers.

  5. Managing Supplier Involvement in New Product Development: A Multiple-Case Study

    NARCIS (Netherlands)

    F.E.A. van Echtelt (Ferrie); J.Y.F. Wynstra (Finn); A.J. van Weele (Arjan); G.M. Duysters (Geert)

    2006-01-01

    textabstractExisting studies of supplier involvement in new product development have mainly focused on project-related short-term processes and success-factors. This study validates and extends an existing exploratory framework, which comprises both long-term strategic processes and short-term

  6. Managing supplier involvement in new product development : a multiple-case study

    NARCIS (Netherlands)

    Echtelt, van F.E.A.; Wynstra, J.Y.F.; Weele, van A.J.; Duysters, G.M.

    2008-01-01

    Existing studies of supplier involvement in new product development have mainly focused on project-related short-term processes and success factors. This study validates and extends an existing exploratory framework, which comprises both long-term strategic processes and short-term operational

  7. Basalt Waste Isolation Project Technical Program Evaluation Process: a criteria-based method

    International Nuclear Information System (INIS)

    Babad, H.; Evans, G.C.; Wolfe, B.A.

    1982-01-01

    The need to objectively evaluate the progress being made by the Basalt Waste Isolation Project (BWIP) toward establishing the feasibility of siting a nuclear waste repository in basalt (NWRB) mandates a process for evaluating the technical work of the project. To assist BWIP management in the evaluation process, the Systems Department staff has developed a BWIP Technical Program Evaluation Process (TPEP). The basic process relates progress on project technical work to the SWIP Functional and System Performance Criteria as defined in National Waste Terminal Storage (MWTS) Criteria Documents. The benefits of the TPEP to BWIP and future plans for TPEP are discussed. During fiscal year (FY) 1982, TPEP wll be further formalized and further applied to the review of BWIP technical activities

  8. Project risk management: A review of an institutional project life cycle

    Directory of Open Access Journals (Sweden)

    Wanjiru Gachie

    2017-11-01

    Full Text Available This article is a desktop analysis of project risk management involving a project management institutional restructuring. The pragmatic nature of this research allows for the literature review and the document analysis to be integrated and presented as both a descriptive and analytical research. The analysis demonstrates that the project committee did not proactively manage project risk. The restructuring was a change management project, entailing the implementation of many organisational changes, such as restructuring, lay-off of some part of the administrative workforce, adoption of new technology, provision of new approaches to well-established procedures, and implementation of new performance initiative, the process which should have been managed with an effective integrated risk strategy and plan. Analysis of the restructuring project risk management exhibits little evidence of a systematic (computer based or manual record that should have provided policies, procedures, and structures for managing risk. The article concludes that the restructuring risk process was inadequate and it could not have ensured a successful project. An analysis of the restructuring project risk monitoring and control exhibits a reactive rather than proactive application of risk management procedures. The analysis further indicates that the committee failed to make use of the various project risk management processes, standards, and guidelines. Based on the conclusions, the article recommends that project risk planning, strategy, control, and monitoring should be put in place for future institutional projects. The project management team should also put in place procedures for primary stakeholders engagements, identify and address their nature of interest and power in future risk management projects

  9. The Collaborative Project Owner in Theory and Practice

    DEFF Research Database (Denmark)

    Frederiksen, Signe Hedeboe; Svejvig, Per

    is complex characterized by information asymmetry and potential mistrust. Studies also show that top managers may actually be reluctant to play an active role during the project life cycle. In this paper, we examine how the involvement of project owners unfolds in the project process, when given explicit...

  10. The optimized baseline project: Reinventing environmental restoration at Hanford

    International Nuclear Information System (INIS)

    Goodenough, J.D.; Janaskie, M.T.; Kleinen, P.J.

    1994-01-01

    The U.S. Department of Energy Richland Operations Office (DOE-RL) is using a strategic planning effort (termed the Optimized Baseline Project) to develop a new approach to the Hanford Environmental Restoration program. This effort seeks to achieve a quantum leap improvement in performance through results oriented prioritization of activities. This effort was conducted in parallel with the renegotiation of the Tri-Party Agreement and provided DOE with an opportunity to propose innovative initiatives to promote cost effectiveness, accelerate progress in the Hanford Environmental Restoration Program and involve stakeholders in the decision-making process. The Optimized Baseline project is an innovative approach to program planning and decision-making in several respects. First, the process is a top down, value driven effort that responds to values held by DOE, the regulatory community and the public. Second, planning is conducted in a way that reinforces the technical management process at Richland, involves the regulatory community in substantive decisions, and includes the public. Third, the Optimized Baseline Project is being conducted as part of a sitewide Hanford initiative to reinvent Government. The planning process used for the Optimized Baseline Project has many potential applications at other sites and in other programs where there is a need to build consensus among diverse, independent groups of stakeholders and decisionmakers. The project has successfully developed and demonstrated an innovative approach to program planning that accelerates the pace of cleanup, involves the regulators as partners with DOE in priority setting, and builds public understanding and support for the program through meaningful opportunities for involvement

  11. The Characterization of Cognitive Processes Involved in Chemical Kinetics Using a Blended Processing Framework

    Science.gov (United States)

    Bain, Kinsey; Rodriguez, Jon-Marc G.; Moon, Alena; Towns, Marcy H.

    2018-01-01

    Chemical kinetics is a highly quantitative content area that involves the use of multiple mathematical representations to model processes and is a context that is under-investigated in the literature. This qualitative study explored undergraduate student integration of chemistry and mathematics during problem solving in the context of chemical…

  12. Cultural differences and process adaptation in international R&D project management

    DEFF Research Database (Denmark)

    Li, Xing; Li, J. Z.

    2009-01-01

    In the era of globalization, Western companies have started to explore China as a source of technology. Yet, Western R&D project management processes in China are frequently facing many problems. Some of the problems can be conceptualized by analyzing a number of known cultural contrasts between ...... project success. At the same time, lessons and recommendations on the adaptability to Chinese style business and management interactions will be drawn from the case study for international companies that locate R&D projects in China.......In the era of globalization, Western companies have started to explore China as a source of technology. Yet, Western R&D project management processes in China are frequently facing many problems. Some of the problems can be conceptualized by analyzing a number of known cultural contrasts between...

  13. Patient involvement in a scientific advisory process: setting the research agenda for medical products.

    NARCIS (Netherlands)

    Elberse, J.E.; Pittens, C.A.C.M.; de Cock Buning, J.T.; Broerse, J.E.W.

    2012-01-01

    Patient involvement in scientific advisory processes could lead to more societally relevant advice. This article describes a case study wherein the Health Council of the Netherlands involved patient groups in an advisory process with a predefined focus: setting a research agenda for medical products

  14. Clean and efficient energy conversion processes (Cecon-project). Final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-12-31

    The objectives of the work programme reported are the development and testing of two optimised energy conversion processes, both consisting of a radiant surface gas burner and a ceramic heat exchanger. The first sub-objective of the programme is related to industrial heating, drying and curing processes requireing low and medium heat fluxes. It is estimated that around one tenth of the total EC industrial energy use is associated with such processes. The majority of these processes currently use convection and conduction as the main heat transfer mechanisms and overall energy efficiencies are typically below 25%. For many drying and finishing processes (such as curing powder coatings and drying paints, varnishes, inks, and for the fabrication of paper and textiles), radiant heating can achieve much faster dyring rates and higher energy efficiency than convective heating. In the project new concepts of natural gas fired radiant heating have been investigated which would be much more efficient than the existing processes. One element of the programme was the evelopment of gas burners having enhanced radiant efficiencies. A second concerned the investigation of the safety of gas burners containing significant volumes of mixed gas and air. Finally the new gas burners were tested in combination with the high temperature heat exchanger to create highly efficient radiant heating systems. The second sub-objective concerned the development of a compact low cost heat exchanger capable of achieving high levels of heat recovery (up to 60%) which could be easily installed on industrial processes. This would make heat recovery a practical proposition on processes where existing heat recovery technology is currently not cost effective. The project will have an impact on industrial processes consuming around 80 MTOE of energy per year within EU countries (1 MTOE equals 41.8 PJ). The overall energy saving potential of the project is estimated to be around 22 MTOE which is around 10

  15. Economics, funding and the influence of politics on the UMTRA Project

    International Nuclear Information System (INIS)

    Hamp, S.

    1993-01-01

    This presentation discusses the factors contributing to the cost of the Uranium Mill Tailings Remediation Action Project and the political process involved in the funding. Topics covered include the following: Funding estimate and growth of estimate; Management actions during process; how the political process worked; cost of completed sites; economic benefit analysis of the project to Colorado; cost reduction program for the UMTRA project

  16. Estimation of weld nugget temperature by thermography method in resistance projection welding process

    International Nuclear Information System (INIS)

    Setty, D.S.; Rameswara Roa, A.; Hemantha Rao, G.V.S.; Jaya Raj, R.N.

    2008-01-01

    In the Pressurized Heavy Water Reactor (PHWR) fuel manufacturing, zirconium alloy appendages like spacer and bearing pads are welded to the thin wall zirconium alloy fuel tubes by using resistance projection welding process. Out of many joining processes available, resistance-welding process is reliable, environment friendly and best suitable for mass production applications. In the fuel assembly, spacer pads are used to get the required inter-element spacing and Bearing pads are used to get the required load-bearing surface for the fuel assembly. Performance of the fuel assembly in the reactor is greatly influenced by these weld joint's quality. Phase transformation from α to β phase is not acceptable while welding these tiny appendages. At present only destructive metallography test is available for this purpose. This can also be achieved by measuring weld nugget temperature where in the phase transformation temperature for zirconium alloy material is 853 o C. The temperature distribution during resistance welding of tiny parts cannot be measured by conventional methods due to very small space and short weld times involved in the process. Shear strength, dimensional accuracy and weld microstructures are some of the key parameters used to measure the quality of appendage weld joints. Weld parameters were optimized with the help of industrial experimentation methodology. Individual projection welding by split electrode concept, and during welding on empty tube firm support is achieved on inner side of the tube by using expandable pneumatic mandrel. In the present paper, an attempt was made to measure the weld nugget temperature by thermography technique and is correlated with standard microstructures of zirconium alloy material. The temperature profiles in the welding process are presented for different welding conditions. This technique has helped in measuring the weld nugget temperature more accurately. It was observed that in the present appendage welding

  17. Leveling a Simple Manufacturing Process Using Microsoft Project and Oracle Primavera

    Directory of Open Access Journals (Sweden)

    Ilie Margareta

    2017-01-01

    Full Text Available The present paper main objective is to put forward two software application tools: Microsoft Project 2013 and Oracle Primavera P6 Professional, used for the management process planning, especially for industrial projects. Second goals is to compare some feature of the two software and emphasize some aspects used for an easier use. The presentation and comparison considered four small processes with a total of 38 activities. The two software are used for the leveling of seven labor resources defined for the achievement of the activities. The results of the analyzes point out that even the two tools have the same purpose, Microsoft Project can be used for general simple to average processes’ complexity and size, Oracle Primavera has more specialized possibilities (libraries and specific project plans and more possibilities to model the actions needed for better leveling.

  18. One project`s waste is another project`s resource

    Energy Technology Data Exchange (ETDEWEB)

    Short, J.

    1997-02-01

    The author describes the efforts being made toward pollution prevention within the DOE complex, as a way to reduce overall project costs, in addition to decreasing the amount of waste to be handled. Pollution prevention is a concept which is trying to be ingrained into project planning. Part of the program involves the concept that ultimately the responsibility for waste comes back to the generator. Parts of the program involve efforts to reuse materials and equipment on new projects, to recycle wastes to generate offsetting revenue, and to increase awareness, accountability and incentives so as to stimulate action on this plan. Summaries of examples are presented in tables.

  19. Creating Robust Evaluation of ATE Projects

    Science.gov (United States)

    Eddy, Pamela L.

    2017-01-01

    Funded grant projects all involve some form of evaluation, and Advanced Technological Education (ATE) grants are no exception. Program evaluation serves as a critical component not only for evaluating if a project has met its intended and desired outcomes, but the evaluation process is also a central feature of the grant application itself.…

  20. Integrating virtual reality and BIM for end-user involvement in building design

    DEFF Research Database (Denmark)

    Petrova, Ekaterina Aleksandrova; Rasmussen, Mai; Jensen, Rasmus Lund

    2017-01-01

    The outcome of projects within Architecture, Engineering, and Construction is highly dependent on the quality of the collaboration between the involved actors. The end-users occupy the buildings on a daily basis, and therefore their involvement in the design process is essential to the output. Ho...

  1. Integrated Project Control and Technical Support

    International Nuclear Information System (INIS)

    Kim, Jun Yeon; Kim, Jun Yeon; Joo, Po Kook and others

    2005-08-01

    First, Since PEFP puts it's aim on technology innovation through collaboration and technological fusion among the sub-projects from the various fields. It has been tried to make the sub-projects consist with the goal of the whole project through building and running the integrated project control system. Also, adopting CPM(Critical Process Management), intensive process management framework has been founded. Secondly, for the every procedure, including purchase, building, installation and a trial running, license, quality control, etc., could be efficiently executed, every related task has been carried out. And, the tasks involved in international cooperative relationship and host site selection are carried out as well, so that PEFP could be firmly supported. Finally, Strategic management procedures including TRM(Technology Road Map), economic evaluation on PEFP, preliminary evaluation on company-involved R and D and TRESIS(Technology, Resources, Economic Evaluation System) are made up not only for the purpose of managing efficiency and effectiveness on the investment, but also for the purpose of life cycle management from developing stage to commercializing stage

  2. Integrated Project Control and Technical Support

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Jun Yeon; Kim, Jun Yeon; Joo, Po Kook and others

    2005-08-15

    First, Since PEFP puts it's aim on technology innovation through collaboration and technological fusion among the sub-projects from the various fields. It has been tried to make the sub-projects consist with the goal of the whole project through building and running the integrated project control system. Also, adopting CPM(Critical Process Management), intensive process management framework has been founded. Secondly, for the every procedure, including purchase, building, installation and a trial running, license, quality control, etc., could be efficiently executed, every related task has been carried out. And, the tasks involved in international cooperative relationship and host site selection are carried out as well, so that PEFP could be firmly supported. Finally, Strategic management procedures including TRM(Technology Road Map), economic evaluation on PEFP, preliminary evaluation on company-involved R and D and TRESIS(Technology, Resources, Economic Evaluation System) are made up not only for the purpose of managing efficiency and effectiveness on the investment, but also for the purpose of life cycle management from developing stage to commercializing stage.

  3. Virtual Project Teams

    DEFF Research Database (Denmark)

    Bjørn, Pernille

    technology in six real-life virtual teams, two in industry and four in education, applying interpretative research and action research methods. Two main lines of investigation are pursued: the first involves an examination of the organisational issues related to groupware adaptation in virtual project teams......, professional disciplines, time differences and technology. This thesis comprises a general introduction, referred to as the summary report, and seven research papers, which deal in detail with the results and findings of the empirical cases. The summary report provides a general introduction to the research......, while the second looks at the social context and practices of virtual project teams. Two of the key findings are 1) that the process of groupware adaptation by virtual project teams can be viewed as a process of expanding and aligning the technological frames of the participants, which includes mutual...

  4. Global Dynamical Systems Involving Generalized -Projection Operators and Set-Valued Perturbation in Banach Spaces

    Directory of Open Access Journals (Sweden)

    Yun-zhi Zou

    2012-01-01

    Full Text Available A new class of generalized dynamical systems involving generalized f-projection operators is introduced and studied in Banach spaces. By using the fixed-point theorem due to Nadler, the equilibrium points set of this class of generalized global dynamical systems is proved to be nonempty and closed under some suitable conditions. Moreover, the solutions set of the systems with set-valued perturbation is showed to be continuous with respect to the initial value.

  5. THE MEASUREMENT AND EVALUATION OF THE INTERNAL COMMUNICATION PROCESS IN PROJECT MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Pop Alexandra Mihaela

    2013-07-01

    The model is a useful tool for improving the internal communication process of a project and help the project raise its efficiency. It has been created based on the characteristics of the information flow within a project. Also the Internal Communication Analysis Model – ICAM – helps improve the projects‘ deliverables by making sure that everyone in the project understood their roles correctly.

  6. Geophysical monitoring of active hydrologic processes as part of the Dynamic Underground Stripping Project

    International Nuclear Information System (INIS)

    Newmark, R.L.

    1992-05-01

    Lawrence Livermore National Laboratory, in collaboration with University of California at Berkeley and Lawrence Berkeley Laboratory, is conducting the Dynamic Underground Stripping Project (DUSP), an integrated project demonstrating the use of active thermal techniques to remove subsurface organic contamination. Complementary techniques address a number of environmental restoration problems: (1) steam flood strips organic contaminants from permeable zones, (2) electrical heating drives contaminants from less permeable zones into the more permeable zones from which they can be extracted, and (3) geophysical monitoring tracks and images the progress of the thermal fronts, providing feedback and control of the active processes. The first DUSP phase involved combined steam injection and vapor extraction in a ''clean'' site in the Livermore Valley consisting of unconsolidated alluvial interbeds of clays, sands and gravels. Steam passed rapidly through a high-permeability gravel unit, where in situ temperatures reached 117 degree C. An integrated program of geophysical monitoring was carried out at the Clean Site. We performed electrical resistance tomography (ERT), seismic tomography (crossborehole), induction tomography, passive seismic monitoring, a variety of different temperature measurement techniques and conventional geophysical well logging

  7. Situation concerning public information about and involvement in the decision-making processes in the nuclear sector. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Gadbois, S.; Heriard Dubreuil, G. [Mutadis, 75 - Paris (France); Vaillant, L.; Schneider, T. [Centre d' Etude sur l' Evaluation de la Protection dans le Domaine Nucleaire - CEPN, 92 - Fontenay aux Roses (France); Paterson, J.; Dawson, M.; Borg Barthet, J. [Aberdeen Univ. (United Kingdom); Prades, A.; Lopez, M.; Sala, R. [CIEMAT, Barcelona (Spain)

    2007-07-01

    The European Commission Directorate General for Energy and Transport (EC DGTREN) launched a study on 'the situation concerning public information about and involvement in decision-making processes in the nuclear sector' in January 2005. The main goal of this project was to inform the EC DGTREN and interested parties of recent developments in the Member States and to provide opportunities for decision-makers and stakeholders at local, national and EU level to exchange views. This study is based on the analysis of opinion polls, regulation and case studies where public information and involvement are a key dimension in the decision-making process and where innovative approaches have been observed. The research material and proposals were presented and discussed at a workshop with 50 delegates, representing the various stakeholders concerned by nuclear activities in Europe. As testified by recent opinion polls and feedback from case studies, there is a strong public demand for more participation in decision-making processes relating to the environment, and nuclear issues specifically. There is an increasing expectation that the phase of decision-framing which determines the scope and objectives of a regulation or of a decision on an industrial facility, involves not only experts and politics, but also NGOs, independent experts, local actors, etc. This expectation is now supported by significant legislation at EU and national levels, the foundation stone of which is the 'Aarhus Convention on the Access to Information, Public Participation in Decision-Making and Access to Justice in Environmental Matters' (1998). One can find different but convergent rationales behind these developments. On the one hand, there is a consideration that nuclear technologies have a potential impact on the public and accordingly require that their development involves affected parties. On the other hand, the problems raised by nuclear activities have an impact at several

  8. Situation concerning public information about and involvement in the decision-making processes in the nuclear sector. Final report

    International Nuclear Information System (INIS)

    Gadbois, S.; Heriard Dubreuil, G.; Vaillant, L.; Schneider, T.; Paterson, J.; Dawson, M.; Borg Barthet, J.; Prades, A.; Lopez, M.; Sala, R.

    2007-01-01

    The European Commission Directorate General for Energy and Transport (EC DGTREN) launched a study on 'the situation concerning public information about and involvement in decision-making processes in the nuclear sector' in January 2005. The main goal of this project was to inform the EC DGTREN and interested parties of recent developments in the Member States and to provide opportunities for decision-makers and stakeholders at local, national and EU level to exchange views. This study is based on the analysis of opinion polls, regulation and case studies where public information and involvement are a key dimension in the decision-making process and where innovative approaches have been observed. The research material and proposals were presented and discussed at a workshop with 50 delegates, representing the various stakeholders concerned by nuclear activities in Europe. As testified by recent opinion polls and feedback from case studies, there is a strong public demand for more participation in decision-making processes relating to the environment, and nuclear issues specifically. There is an increasing expectation that the phase of decision-framing which determines the scope and objectives of a regulation or of a decision on an industrial facility, involves not only experts and politics, but also NGOs, independent experts, local actors, etc. This expectation is now supported by significant legislation at EU and national levels, the foundation stone of which is the 'Aarhus Convention on the Access to Information, Public Participation in Decision-Making and Access to Justice in Environmental Matters' (1998). One can find different but convergent rationales behind these developments. On the one hand, there is a consideration that nuclear technologies have a potential impact on the public and accordingly require that their development involves affected parties. On the other hand, the problems raised by nuclear activities have an impact at several levels (local

  9. Quality initiatives: planning, setting up, and carrying out radiology process improvement projects.

    Science.gov (United States)

    Tamm, Eric P; Szklaruk, Janio; Puthooran, Leejo; Stone, Danna; Stevens, Brian L; Modaro, Cathy

    2012-01-01

    In the coming decades, those who provide radiologic imaging services will be increasingly challenged by the economic, demographic, and political forces affecting healthcare to improve their efficiency, enhance the value of their services, and achieve greater customer satisfaction. It is essential that radiologists master and consistently apply basic process improvement skills that have allowed professionals in many other fields to thrive in a competitive environment. The authors provide a step-by-step overview of process improvement from the perspective of a radiologic imaging practice by describing their experience in conducting a process improvement project: to increase the daily volume of body magnetic resonance imaging examinations performed at their institution. The first step in any process improvement project is to identify and prioritize opportunities for improvement in the work process. Next, an effective project team must be formed that includes representatives of all participants in the process. An achievable aim must be formulated, appropriate measures selected, and baseline data collected to determine the effects of subsequent efforts to achieve the aim. Each aspect of the process in question is then analyzed by using appropriate tools (eg, flowcharts, fishbone diagrams, Pareto diagrams) to identify opportunities for beneficial change. Plans for change are then established and implemented with regular measurements and review followed by necessary adjustments in course. These so-called PDSA (planning, doing, studying, and acting) cycles are repeated until the aim is achieved or modified and the project closed.

  10. Project management metrics, KPIs, and dashboards a guide to measuring and monitoring project performance

    CERN Document Server

    Kerzner, Harold

    2017-01-01

    With the growth of complex projects, stakeholder involvement, and advancements in visual-based technology, metrics and KPIs (key performance indicators) are key factors in evaluating project performance. Dashboard reporting systems provide accessible project performance data, and sharing this vital data in a concise and consistent manner is a key communication responsibility of all project managers. This 3rd edition of Kerzner’s groundbreaking work includes the following updates: new sections on processing dashboard information, portfolio management PMO and metrics, and BI tool flexibility. PPT decks by chapter and a test bank will be available for use in seminar presentations and courses.

  11. Involving construction in the preliminary engineering process

    International Nuclear Information System (INIS)

    Mahoney, D.T. Jr.; Boccieri, S.V. Jr.

    1994-01-01

    With today's high cost associated with modifications in nuclear power plants, it is imperative that the authors continue to investigate ways to cut costs but at the same time improve efficiency and reduce radiation exposure to those directly associated with the implementation of modifications. The success associated with involving construction in the preliminary engineering process will not only cut costs and improve efficiency but will establish a Team Building concept to provide accountability to all those associated with the implementation of the task. This form of partnering focuses on the solutions rather than highlighting the difficulties. This paper will demonstrate techniques to implement such ideas and provide examples to corroborate actual successes already achieved

  12. Identification of shareholder ethics and responsibilities in online reverse auctions for construction projects.

    Science.gov (United States)

    Hatipkarasulu, Yilmaz; Gill, James H

    2004-04-01

    The increasing number of companies providing internet services and auction tools helped popularize the online reverse auction trend for purchasing commodities and services in the last decade. As a result, a number of owners, both public and private, accepted the online reverse auctions as the bidding technique for their construction projects. Owners, while trying to minimize their costs for construction projects, are also required to address their ethical responsibilities to the shareholders. In the case of online reverse auctions for construction projects, the ethical issues involved in the bidding technique directly reflects on the owner's ethical and social responsibilities to their shareholders. The goal of this paper is to identify the shareholder ethics and responsibilities in online reverse auctions for construction projects by analyzing the ethical issues for the parties involved in the process. The identification of the ethical issues and responsibilities requires clear definition and understanding of professional ethics and the roles of the involved parties. In this paper, first, the concept of professional ethics and social responsibility is described in a general form. To illustrate the ethical issues and responsibilities, a sample case of bidding for a construction project using online reverse auction techniques is presented in which the shareholders were actively involved in questioning the ethical issues. The issues involved in the bidding process and their reflection on the shareholder responsibilities are described and analyzed for each stage of the process. A brief discussion of the overall process is also included to address the general ethical issues involved in online reverse auctions.

  13. West Valley demonstration project: alternative processes for solidifying the high-level wastes

    International Nuclear Information System (INIS)

    Holton, L.K.; Larson, D.E.; Partain, W.L.; Treat, R.L.

    1981-10-01

    In 1980, the US Department of Energy (DOE) established the West Valley Solidification Project as the result of legislation passed by the US Congress. The purpose of this project was to carry out a high level nuclear waste management demonstration project at the Western New York Nuclear Service Center in West Valley, New York. The DOE authorized the Pacific Northwest Laboratory (PNL), which is operated by Battelle Memorial Institute, to assess alternative processes for treatment and solidification of the WNYNSC high-level wastes. The Process Alternatives Study is the suject of this report. Two pretreatment approaches and several waste form processes were selected for evaluation in this study. The two waste treatment approaches were the salt/sludge separation process and the combined waste process. Both terminal and interim waste form processes were studied. The terminal waste form processes considered were: borosilicate glass, low-alkali glass, marbles-in-lead matrix, and crystallinolecular potential and molecular dynamics calculations of the effect are yet to be completed. Cous oxide was also investigated. The reaction is first order in nitrite ion, second order in hydrogen ion, and between zero and first order in hydroxylamine monosulfonate, depending on the concentration

  14. The DIALOGUE project: The right decision? A sociological evaluation of the project

    International Nuclear Information System (INIS)

    Sundqvist, G.

    1993-11-01

    The DIALOGUE project has been conducted by the Swedish Nuclear Power Inspectorate (SKI) since 1990. The aim of the project was to stimulate a dialogue between different interest groups within Sweden. The purpose of this dialogue was to establish a licensing process, prior to a future licensing of a repository for spent nuclear waste, in which several of the parties involved are reasonably confident. The DIALOGUE project was carried out with the participation of other government agencies, municipalities and environmental groups and was headed by the former chairman of the National Licensing Board for Environmental Protection

  15. EPOS Thematic Core Service Anthropogenic Hazards for SHEER project: maintain, process and manage your project research data

    Science.gov (United States)

    Orlecka-Sikora, Beata; Lasocki, Stanislaw; Staszek, Monika; Olszewska, Dorota; Urban, Pawel; Jaroslawski, Janusz; Cielesta, Szymon; Mirek, Janusz; Wiszniowski, Jan; Picozzi, Matteo; Solaro, Giuseppe; Pringle, Jamie; Toon, Sam; Cesca, Simone; Kuehn, Daniela; Ruigrok, Elmer; Gunning, Andrew; Isherwood, Catherine

    2017-04-01

    The main objective of the "Shale gas exploration and exploitation induced risks - SHEER" project (Horizon 2020, call LCE 16-2014) is to develop a probabilistic methodology to assess and mitigate the short- and the long-term environmental risks associated with the exploration and exploitation of shale gas. To this end, the SHEER project makes use of a large amount of heterogeneous data of various types. This data, from different disciplines of science e.g. geophysical, geochemical, geological, technological, etc., must be homogenized, harmonized and made accessible exclusively for all project participants. This requires to develop an over-arching structure for high-level multidisciplinary data integration. The bespoke solution is provided by Thematic Core Service Anthropogenic Hazards (TCS AH) developed in the framework of European Plate Observing System Program (https://tcs.ah-epos.eu/, infrastructural projects IS-EPOS, POIG.02.03.00-14-090/13-00 and EPOS IP, H2020-INFRADEV-1-2015-1). TCS AH provides virtual access to a comprehensive, wide-scale and high quality research infrastructure in the field of induced seismicity and other anthropogenic hazards evoked by exploration and exploitation of geo-resources. TCS AH is designed as a functional e-research environment to ensure a researcher the maximum possible freedom for experimentation by providing a virtual laboratory flexible to create own workspace for processing streams. A data-management process promotes the use of research infrastructure in novel ways providing an access to (i) data gathered in the so-called "episodes", comprehensively describing a geophysical process, induced or triggered by human technological activity, which under certain circumstances can become hazardous for people, infrastructure and the environment, (ii) problem-oriented, specific services, with the particular attention devoted to methods analyzing correlations between technology, geophysical response and resulting hazards, (iii) the

  16. Document Management Projects: implementation guide

    Directory of Open Access Journals (Sweden)

    Beatriz Bagoin Guimarães

    2016-12-01

    Full Text Available Records Management System implementation is a complex process that needs to be executed by a multidisciplinary team and involves components of apparently non-related areas such as archival science, computer engineering, law, project management and human resource management. All of them are crucial and complementary to guarantee a full and functional implementation of a system and a perfect fusion with the connected processes and procedures. The purpose of this work is to provide organizations with a basic guide to Records Management Project implementation beginning with the steps prior to acquiring the system, following with the main project activities and concluding with the post implementation procedures of continuous improvement and system maintenance.

  17. CO-PRODUCT ENHANCEMENT AND DEVELOPMENT FOR THE MASADA OXYNOL PROCESS PROCESS

    Energy Technology Data Exchange (ETDEWEB)

    Donald V. Watkins

    2010-06-14

    The focus of this project was an overall process improvement through the enhancement of the co-product streams. The enhancement of the process operations and co-products will increase both ethanol production and the value of other process outputs and reduces the amount of waste byproducts. This leads to a more economical and environmentally sound alternative to landfill disposal of municipal solid waste (MSW). These enhancements can greatly increase the commercial potential for the production of ethanol from MSW by the Masada CES OxyNol process. Both technological and economical issues were considered for steps throughout the conversion process. The research efforts of this project are varied but synergistic. The project investigated many of the operations involved in the Masada process with the overall goal of process improvements. The general goal of the testing was to improve co-product quality, improve conversions efficiencies, minimize process losses, increase energy efficiency, and mitigate process and commercialization risks. The project was divided into 16 subtasks as described in general terms below. All these tasks are interrelated but not necessarily interdependent.

  18. Tritium Facilities Modernization and Consolidation Project Process Waste Assessment (Project S-7726)

    Energy Technology Data Exchange (ETDEWEB)

    Hsu, R.H. [Westinghouse Savannah River Company, AIKEN, SC (United States); Oji, L.N.

    1997-11-14

    Under the Tritium Facility Modernization {ampersand} Consolidation (TFM{ampersand}C) Project (S-7726) at the Savannah River Site (SS), all tritium processing operations in Building 232-H, with the exception of extraction and obsolete/abandoned systems, will be reestablished in Building 233-H. These operations include hydrogen isotopic separation, loading and unloading of tritium shipping and storage containers, tritium recovery from zeolite beds, and stripping of nitrogen flush gas to remove tritium prior to stack discharge. The scope of the TFM{ampersand}C Project also provides for a new replacement R&D tritium test manifold in 233-H, upgrading of the 233- H Purge Stripper and 233-H/234-H building HVAC, a new 234-H motor control center equipment building and relocating 232-H Materials Test Facility metallurgical laboratories (met labs), flow tester and life storage program environment chambers to 234-H.

  19. The Basalt Waste Isolation Project technical program evaluation process: A criteria-based method

    International Nuclear Information System (INIS)

    Babad, H.; Evans, C.; Wolfe, B.A.

    1982-01-01

    The need to objectively evaluate the progress being made by the Basalt Waste Isolation Project (BWIP) toward establishing the feasibility of siting a nuclear waste repository in basalt (NWRB) mandates a process for evaluating the technical work of the project. To assist BWIP management in the evaluation process, the Systems Department staff has developed a BWIP Technical Program Evaluation Process (TPEP). The basic process relates progress on project technical work to the BWIP Functional and System Performance Criteria as defined in National Waste Terminal Storage (NWTS) Criteria Documents. The benefits of the TPEP to BWIP and future plans for TPEP are discussed. During fiscal year (FY) 1982, TPEP will be further formalized and further applied to the review of BWIP technical activities

  20. PLANNING QUALITY ASSURANCE PROCESSES IN A LARGE SCALE GEOGRAPHICALLY SPREAD HYBRID SOFTWARE DEVELOPMENT PROJECT

    Directory of Open Access Journals (Sweden)

    Святослав Аркадійович МУРАВЕЦЬКИЙ

    2016-02-01

    Full Text Available There have been discussed key points of operational activates in a large scale geographically spread software development projects. A look taken at required QA processes structure in such project. There have been given up to date methods of integration quality assurance processes into software development processes. There have been reviewed existing groups of software development methodologies. Such as sequential, agile and based on RPINCE2. There have been given a condensed overview of quality assurance processes in each group. There have been given a review of common challenges that sequential and agile models are having in case of large geographically spread hybrid software development project. Recommendations were given in order to tackle those challenges.  The conclusions about the best methodology choice and appliance to the particular project have been made.

  1. California Food Processing Industry Wastewater Demonstration Project: Phase I Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Lewis, Glen; Atkinson, Barbara; Rhyne, Ivin

    2009-09-09

    Wastewater treatment is an energy-intensive process and electricity demand is especially high during the utilities summer peak electricity demand periods. This makes wastewater treatment facilities prime candidates for demand response programs. However, wastewater treatment is often peripheral to food processing operations and its demand response opportunities have often been overlooked. Phase I of this wastewater demonstration project monitored wastewater energy and environmental data at Bell-Carter Foods, Inc., California's largest olive processing plant. For this monitoring activity the project team used Green Energy Management System (GEMS) automated enterprise energy management (EEM) technologies. This report presents results from data collected by GEMS from September 15, 2008 through November 30, 2008, during the olive harvest season. This project established and tested a methodology for (1) gathering baseline energy and environmental data at an industrial food-processing plant and (2) using the data to analyze energy efficiency, demand response, daily peak load management, and environmental management opportunities at the plant. The Phase I goals were to demonstrate the measurement and interrelationship of electricity demand, electricity usage, and water quality metrics and to estimate the associated CO{sub 2} emissions.

  2. Evaluation of current Australian health service accreditation processes (ACCREDIT-CAP): protocol for a mixed-method research project.

    Science.gov (United States)

    Hinchcliff, Reece; Greenfield, David; Moldovan, Max; Pawsey, Marjorie; Mumford, Virginia; Westbrook, Johanna Irene; Braithwaite, Jeffrey

    2012-01-01

    Accreditation programmes aim to improve the quality and safety of health services, and have been widely implemented. However, there is conflicting evidence regarding the outcomes of existing programmes. The Accreditation Collaborative for the Conduct of Research, Evaluation and Designated Investigations through Teamwork-Current Accreditation Processes (ACCREDIT-CAP) project is designed to address key gaps in the literature by evaluating the current processes of three accreditation programmes used across Australian acute, primary and aged care services. The project comprises three mixed-method studies involving documentary analyses, surveys, focus groups and individual interviews. Study samples will comprise stakeholders from across the Australian healthcare system: accreditation agencies; federal and state government departments; consumer advocates; professional colleges and associations; and staff of acute, primary and aged care services. Sample sizes have been determined to ensure results allow robust conclusions. Qualitative information will be thematically analysed, supported by the use of textual grouping software. Quantitative data will be subjected to a variety of analytical procedures, including descriptive and comparative statistics. The results are designed to inform health system policy and planning decisions in Australia and internationally. The project has been approved by the University of New South Wales Human Research Ethics Committee (approval number HREC 10274). Results will be reported to partner organisations, healthcare consumers and other stakeholders via peer-reviewed publications, conference and seminar presentations, and a publicly accessible website.

  3. The Community Publishing Project: assisting writers to self-publish ...

    African Journals Online (AJOL)

    This article examines the need for a small project such as the Community Publishing Project in South Africa and explores its aims. The method of involving writers and community groups in the publication process is described and two completed projects are evaluated. Lessons learnt by the Centre for the Book in managing ...

  4. Projecting Fatalities in Crashes Involving Older Drivers, 2000-2025

    Energy Technology Data Exchange (ETDEWEB)

    Hu, P.S.

    2001-03-23

    As part of this research effort, we developed a new methodology for projecting elderly traffic crash fatalities. This methodology separates exposure to crashes from crash risk per se, and further divides exposure into two components, the number of miles driven and the likelihood of being a driver. This component structure permits conceptually different determinants of traffic fatalities to be projected separately and has thorough motivation in behavioral theory. It also permits finer targeting of particular aspects of projections that need improvement and closer linking of projections to possible policy instruments for influencing them.

  5. The study of the risk management model of construction project

    International Nuclear Information System (INIS)

    Jiang Bo; Feng Yanping; Liu Changbin

    2010-01-01

    The paper first analyzed the development of the risk management of construction project and the risk management processes, and then briefly introduced the risk management experience of foreign project management. From the project management by objectives point of view, the greatest risk came from the lack of clarity of the objectives in the project management, which led to the project's risk emergence. In the analysis of the principles of the project objectives identification and risk allocation, the paper set up a project management model which insurance companies involved in the whole process of the project management, and simply analyzed the roles of insurance company at last. (authors)

  6. A Blended Learning Approach to Teaching Project Management: A Model for Active Participation and Involvement: Insights from Norway

    Directory of Open Access Journals (Sweden)

    Bassam A. Hussein

    2015-04-01

    Full Text Available The paper demonstrates and evaluates the effectiveness of a blended learning approach to create a meaningful learning environment. We use the term blended learning approach in this paper to refer to the use of multiple or hybrid instructional methods that emphasize the role of learners as contributors to the learning process rather than recipients of learning. Contribution to learning is attained by using in class gaming as pathways that ensure active involvement of learners. Using a blended learning approach is important in order to be able to address different learning styles of the target group. The approach was also important in order to be able to demonstrate different types of challenges, issues and competences needed in project management. Student evaluations of the course confirmed that the use of multiple learning methods and, in particular, in class gaming was beneficial and contributed to a meaningful learning experience.

  7. Regulatory and Stakeholder Involvement is Key to Successful Project Completion

    International Nuclear Information System (INIS)

    Ballinger, K. S.; Coleman, S. J.; Shoemake, J. M.; Olds, T. E.

    2006-01-01

    Public involvement participation is an integral and effective component of the U.S. Department of Energy's (DOE) activities that ensures crucial decisions are made with the benefit and consideration of public perspectives. This component brings a broad range of diverse viewpoints and values into DOE's decision-making processes before end decision points are reached. Early involvement enables DOE to make more informed decisions, improve quality through collaborative efforts, and helps to build mutual understanding and trust between DOE and the public it serves. During the cold war, the production of thousands of nuclear warheads was an outstanding engineering achievement that created materials and technologies that were vital to national interest and security; however, it also created a legacy of perplexing toxic nuclear waste. The significant challenges presented by the liquid and solid nuclear wastes stored at the Hanford Site, were formally acknowledged by the U.S. Congress when it directed DOE to establish the Office of River Protection (ORP). The office was assigned the single, dedicated mission of retrieving, treating, and disposing of all waste contained in 177 huge underground storage tanks at the Hanford Site in Southeastern Washington State. As part of this on-going mission of cleanup, the Office of River Protection must make sound decisions that uphold not only the Department of Energy's interests, but more importantly, the interests of the state of Washington. Public participation is an open, ongoing, two-way communication, both formal and informal, between DOE and its stakeholders, regulatory agencies and Tribal governments. Similarly, public information is a means to keep the public informed of progress or to status ongoing activities and/or issues. Another facet of this process is that various laws and regulations govern public participation and information when it comes to Hanford cleanup, including the Hanford Federal Facility Agreement and Consent

  8. Tritium Facilities Modernization and Consolidation Project Process Waste Assessment (Project S-7726)

    International Nuclear Information System (INIS)

    Hsu, R.H.; Oji, L.N.

    1997-01-01

    Under the Tritium Facility Modernization ampersand Consolidation (TFM ampersand C) Project (S-7726) at the Savannah River Site (SS), all tritium processing operations in Building 232-H, with the exception of extraction and obsolete/abandoned systems, will be reestablished in Building 233-H. These operations include hydrogen isotopic separation, loading and unloading of tritium shipping and storage containers, tritium recovery from zeolite beds, and stripping of nitrogen flush gas to remove tritium prior to stack discharge. The scope of the TFM ampersand C Project also provides for a new replacement R ampersand D tritium test manifold in 233-H, upgrading of the 233- H Purge Stripper and 233-H/234-H building HVAC, a new 234-H motor control center equipment building and relocating 232-H Materials Test Facility metallurgical laboratories (met labs), flow tester and life storage program environment chambers to 234-H

  9. Learning by Doing: the Progressive Novella Project.

    Science.gov (United States)

    Conroy, Michael G.

    1996-01-01

    States that the Progressive Novella Project for high school students involves the collaborative writing of a 35-50 page novella. Explains that prior to the actual writing process, students are educated in the basic elements of fiction writing. Describes the division of labor into groups. Comments that the results of the project are invariably…

  10. Licensing aspects regarding the RBMN project

    International Nuclear Information System (INIS)

    Cuccia, Valeria; Sacramento, Arivaldo M.; Aleixo, Bruna L.; Ferreira, Vinicius V.M.

    2013-01-01

    The licensing process of a waste disposal facility is a complex and demanding undertaking. It proceeds in phases, starting with the site selection and ending many decades later, when the radionuclides decayed and no longer offer possible hazard. That is one of the reasons why the licensing process for the Brazilian repository for low and intermediate level radioactive waste (RBMN Project) is a challenge for all the technicians involved. Besides that, the only national experience associated to this subject arose after a radiological accident in the State of Goias, in 1987. Two different institutions are involved in this licensing process: IBAMA, for environmental licensing, and CNEN, for nuclear licensing. Both of them will evaluate the possible impacts caused by the waste disposal, so it is essential to avoid conflicts and duplications of activities. The RBMN project has different teams for each main activity, and one of them is the Licensing group. This team has been planning the licensing activities for the repository, studying the legal framework and estimating costs and execution time for each step. This paper presents the status of the licensing activities regarding to the RBMN project done by the CNEN staff. (author)

  11. Project and Innovation Management in New Product Development Processes

    DEFF Research Database (Denmark)

    Henriksen, Leif; Gayretli, Ahmet

    2010-01-01

    Although the process of innovation is one of the most important drivers behind the growth and prosperity of today’s global economy, it is one of the least understood. This paper aims to address specific problems in carrying out new product development processes. There are crucial issues related...... to product design processes like inefficient project management, increasing product complexity, conflict management, shortfall of existing methods and tools, and high failures in new product introduction. A new approach has been proposed for a system based platform, which consist of a product platform...

  12. Making sense of project management

    DEFF Research Database (Denmark)

    Kjærgaard, Annemette; Kautz, Karl; Nielsen, Peter Axel

    2007-01-01

    How can a software company make sense of project management when it becomes involved in software process improvement? In software development most research has an instrumental view of knowledge management thus neglecting what is probably the most important part of knowledge management namely making...... sense of practice by developers and project managers. Through an action case, we study the knowledge management processes in a Danish software company. We analyse the case through the lens of a theoretical framework. The theoretical framework focuses in particular on sensemaking, collective construed...... substantial insight which could not have been achieved through an instrumental perspective on knowledge management....

  13. Storytelling Practices in Project Management : Exploratory study in new business process implementation in Information and Communication Technology projects

    OpenAIRE

    Abdubaliev, Ulukbek; Akysheva, Aizhan

    2017-01-01

    Stories have always been present in the life of people as a part of their culture, it is a rather ancient narrative technique. The message delivered in a form of a story is specifically appealing to listeners, which makes it a powerful communication tool. The thesis explores storytelling practices in project management by answering the question: “How project managers use storytelling in new business process implementation in ICT projects?” The choice of the topic was driven by the gap in the ...

  14. Using Workflow Modeling to Identify Areas to Improve Genetic Test Processes in the University of Maryland Translational Pharmacogenomics Project.

    Science.gov (United States)

    Cutting, Elizabeth M; Overby, Casey L; Banchero, Meghan; Pollin, Toni; Kelemen, Mark; Shuldiner, Alan R; Beitelshees, Amber L

    Delivering genetic test results to clinicians is a complex process. It involves many actors and multiple steps, requiring all of these to work together in order to create an optimal course of treatment for the patient. We used information gained from focus groups in order to illustrate the current process of delivering genetic test results to clinicians. We propose a business process model and notation (BPMN) representation of this process for a Translational Pharmacogenomics Project being implemented at the University of Maryland Medical Center, so that personalized medicine program implementers can identify areas to improve genetic testing processes. We found that the current process could be improved to reduce input errors, better inform and notify clinicians about the implications of certain genetic tests, and make results more easily understood. We demonstrate our use of BPMN to improve this important clinical process for CYP2C19 genetic testing in patients undergoing invasive treatment of coronary heart disease.

  15. Engineering and construction projects for oil and gas processing facilities: Contracting, uncertainty and the economics of information

    International Nuclear Information System (INIS)

    Berends, Kees

    2007-01-01

    The amount of oil and gas processing capacity required to meet demand during the next 20 years is more than twice the amount realised during the last decades. Engineering and Construction contractors (ECs) play a key role in the development and implementation of Large Engineering and Construction Projects (LECPs) for these facilities. We examine the characteristics of LECPs, demand and supply of the contracting market and the strategies traditionally adopted by owners to contract out the development and implementation of these projects to ECs. We demonstrate that these traditional strategies are not longer effective, in the current 'sellers market', to mitigate the oligopolistic economic inefficiencies. As the 'overheating' of the contracting market is expected to continue for a considerable period of time, alternative contracting strategies are required. Contract theory, particularly the economics of information on LECPs, indicates how alternative contracting strategies can be used to overcome economic inefficiencies. The effective use of these alternative strategies requires increased owner involvement and their effectiveness is contingent upon owner competency and ECs acting as the owner's agent rather than its adversary. This will require an organisational and behavioural change process for both owners and ECs

  16. Implementation of Agile project management in spent nuclear fuel characterization process

    International Nuclear Information System (INIS)

    Vinas Pena, P.

    2015-01-01

    Full text of publication follows. Spent nuclear fuel characterization (SNFC) is a complex process that covers different areas of analysis and whose final goal is to provide an accurate description of spent nuclear fuel (SNF) status for its future classification for storage and transport. The need to reduce the SNFC processing time maintaining the quality of the product has motivated ENUSA to research and implement Agile project management and human performance techniques. The Agile management techniques are focused in accommodate changes or new requirements in the project during the elaboration process without suffering delays or lose of quality. For its SNF projects ENUSA uses 2 complementary techniques: SCRUM and Kanban. SCRUM methodology is based on divide the process into activities blocks. Each block is a finished part of the final product which allows periodical deliveries of the product and the easy introduction of changes if they are necessary. The characterization process is formed by blocks of activities based on different analysis for every fuel assembly as the existence of leaking rods; the analysis of the structural integrity considering the existence of missing rods, broken or missing grids or grid straps or grid springs...; the corrosion phenomenon on the rod that could affect its integrity during the storage and transport; the burnup of the fuel assembly; the analysis of the rod internal pressure and its effect on rod failure mechanism as creep or on the material embrittlement due to the radial hydride precipitation; the compatibility with the container to avoid operational problems during cask loading and unloading, and any new input based on the regulatory evolution and the industry state of the art. The different analysis can be developed at the same time as they are independent. Kanban methodology consists in a visual representation of the evolution of the process. In a chart, the different activities needed to perform any of the analysis

  17. Power is in the Process: The ACCORD project

    Directory of Open Access Journals (Sweden)

    Mhairi Maxwell

    2017-06-01

    Full Text Available The ACCORD (Archaeology Community Co-Production of Research Data project worked together with communities to create 3D digital visualisations of heritage. Communities across Scotland chose monuments and sites that were of particular interest to them and then participated in the whole process of creating 3D visualisations of those places (from data-capture, to processing, to archiving together with researchers and heritage professionals. In the main we used consumer-level technology and relatively easy to pick up techniques of photogrammetry and Reflectance Transformation Imaging, while occasionally also using the specialist technique of laser-scanning I was the Post-Doctoral- Research-Assistant on the ACCORD project for 12 months from March 2014 through to 2015 and this article will reflect on my experience of participating in the making of 3D digital visualisations together with ACCORD communities. It argues that there exists in the field of digital heritage an uneasy tension between the current motivation to produce objective computerised visualisations and the actual desire of heritage community groups to connect to the past on a more emotional level. The article revels in the participatory process of making 3D digital visualisations of heritage; its power as a medium for inclusion, exploration and expression. This article should be read with reference to the archive.

  18. Portfolio Assessment of an Undergraduate Group Project

    Science.gov (United States)

    Kuisma, Raija

    2007-01-01

    Students in the Physiotherapy Programme carried out a group project in their final year of studies. The objectives of the project were that the students learn and appreciate the process and activities involved in research, acquire deeper understanding of a topic in their professional interest, learn to work as a team, manage their own time,…

  19. Knowledge and Processes in Design. DPS Final Report.

    Science.gov (United States)

    Pirolli, Peter

    Four papers from a project concerning information-processing characterizations of the knowledge and processes involved in design are presented. The project collected and analyzed verbal protocols from instructional designers, architects, and mechanical engineers. A framework was developed for characterizing the problem spaces of design that…

  20. The INNOHYP-CA Project: producing Hydrogen by innovative high-temperature processes

    International Nuclear Information System (INIS)

    Giaconia, A.; Giorgiantoni, G.; Liberatore, R.; Tarquini, P.; Vignolini, M.

    2008-01-01

    The Project, financed under the 6. Framework Programme, has selected a member of innovative high-temperature processes that seem promising for large-scale production of Hydrogen. ENEA has contributed to the analysis of the status of national and regional projects in the European countries and to the definition of guidelines for the future development of these technologies [it

  1. Spent Nuclear Fuel (SNF) Project Design Verification and Validation Process

    International Nuclear Information System (INIS)

    OLGUIN, L.J.

    2000-01-01

    This document provides a description of design verification and validation activities implemented by the Spent Nuclear Fuel (SNF) Project. During the execution of early design verification, a management assessment (Bergman, 1999) and external assessments on configuration management (Augustenburg, 1999) and testing (Loscoe, 2000) were conducted and identified potential uncertainties in the verification process. This led the SNF Chief Engineer to implement corrective actions to improve process and design products. This included Design Verification Reports (DVRs) for each subproject, validation assessments for testing, and verification of the safety function of systems and components identified in the Safety Equipment List to ensure that the design outputs were compliant with the SNF Technical Requirements. Although some activities are still in progress, the results of the DVR and associated validation assessments indicate that Project requirements for design verification are being effectively implemented. These results have been documented in subproject-specific technical documents (Table 2). Identified punch-list items are being dispositioned by the Project. As these remaining items are closed, the technical reports (Table 2) will be revised and reissued to document the results of this work

  2. Continuous Briefing and User Participation in Building Projects

    DEFF Research Database (Denmark)

    Jensen, Per Anker

    2006-01-01

    and the methods for user participation, identifies problem areas and point out possible improvements. The author has been actively involved in the project as deputy project director with re-sponsibility for the briefing process until spring 2005 and is now a researcher.......Briefing is not just about specifying needs as requirements but also about evaluating how well design pro-posals fulfill the needs and aspirations. Furthermore, briefing is not only about building design. Briefing starts at the pre-project stage to create a basis for the project decision...... into the building is required. A building project is often part of a change process of the organisation that is going to occupy the building, and this change process should be management carefully to reach a successful result. An important aspect of briefing is to manage the par-ticipation of the coming users...

  3. Quality improvement process pilot project at Gallagher station

    International Nuclear Information System (INIS)

    Vondielingen, D.E.

    1992-01-01

    A Quality Improvement Process was piloted at Gallagher station in 1990 to address issues of two Electric System Strategy Group (ESSG) goals. Darrell McElravy headed a group to address quality, productivity and prove and Judy Rushing headed a group to address innovation and recognition. These groups combined when a process was identified that could address both issues. The process was designed for PSI Energy by Business Incentives and is an incentive-based quality improvement process that seeks employee involvement to identify inhibitors t performance and to establish a method to eliminate the problem. Performance goals were also established that help focus efforts to improve performance and reward employees for their efforts

  4. Involving patients in care decisions improves satisfaction: an outcomes-based quality improvement project.

    Science.gov (United States)

    Leff, Ellen W

    2004-05-01

    A home care agency used quality improvement processes to improve patient satisfaction survey ratings. The focus was on involving patients in decisions about their care. A multidisciplinary team developed creative strategies to increase staff awareness and enhance customer service skills, which had dramatic results.

  5. A voice from the high wire: Public involvement in a co-operative siting process

    International Nuclear Information System (INIS)

    Oates, D.J.L.

    1995-01-01

    The author is a public consultation and communications consultant to the Siting Task Force (STF), Low level Radioactive Waste Management. The STF is a Canadian government-appointed yet independent body implementing a voluntary, co-operative siting process for a long term storage or disposal facility for 1 million cubic metres of LLRW. The presentation will document the experiences of and lessons learned by the author during her role developing and implementing a public involvement program for the process. The Co-operative Siting Process is a new approach to siting controversial facilities. It is based on the belief that communities should accept such a facility in their backyard and not be forced against their will on technical or political grounds. A formal 'ground rules-up-front' process was developed and is now being carried out, with completion slated for April, 1995. Putting these rules and theories into practice has resulted in significant changes being made to the work plan for technical activities, and in a sober second look at the intricacies involved in planning and carrying out a thorough and efficient public involvement program that remain practical and cost-effective. There is a delicate balancing act between meaningful public participation that lays the foundation for trust, confidence and consensus, and public involvement that can result in the process being side-tracked and legitimate solutions and technical activities becoming mired in political and personal agendas

  6. Multi-site risk-based project planning, optimization, sequencing, & budgeting process and tool for the integrated facility disposition project

    International Nuclear Information System (INIS)

    Nelson, J.G.; Castillo, C.; Huntsman, J.; Killoy, S.; Lucek, H.; Marks, T.C.

    2011-01-01

    Faced with the Department of Energy (DOE) Complex Transformation, National Nuclear Security Administration (NNSA) was tasked with developing an integrated plan for the decommissioning of over 400 facilities and 300 environmental remediation units, as well as the many reconfiguration and modernization projects at the Oak Ridge National Laboratory (ORNL) and Y-12 Complex. Manual scheduling of remediation activities is time-consuming and inherently introduces bias of the scheduler or organization into the process. Clearly a well-defined process, quantitative risk-based tool was needed to develop an objective, unbiased baseline sequence and schedule with a sound technical foundation for the Integrated Facility Disposition Project (IFDP). Faced with limited available data, innovation was needed to extrapolate intelligent relative data for key risk parameters based on known data elements. The IFDP Supermodel was customized and expanded to provide this capability for conceptual planning of diverse project portfolios and multiple sites. (author)

  7. Process, cost modeling and simulations for integrated project development of biomass for fuel and protein

    International Nuclear Information System (INIS)

    Pannir Selvam, P.V.; Wolff, D.M.B.; Souza Melo, H.N.

    1998-01-01

    The construction of the models for biomass project development are described. These models, first constructed using QPRO electronic spread sheet for Windows, are now being developed with the aid of visual and object oriented program as tools using DELPHI V.1 for windows and process simulator SUPERPRO, V.2.7 Intelligent Inc. These models render the process development problems with economic objectives to be solved very rapidly. The preliminary analysis of cost and investments of biomass utilisation projects which are included for this study are: steam, ammonia, carbon dioxide and alkali pretreatment process, methane gas production using anaerobic digestion process, aerobic composting, ethanol fermentation and distillation, effluent treatments using high rate algae production as well as cogeneration of energy for drying. The main project under developments are the biomass valuation projects with the elephant (Napier) grass, sugar cane bagasse and microalgae, using models for mass balance, equipment and production cost. The sensibility analyses are carried out to account for stochastic variation of the process yield, production volume, price variations, using Monte Carlo method. These models allow the identification of economical and scale up problems of the technology. The results obtained with few preliminary project development with few case studies are reported for integrated project development for fuel and protein using process and cost simulation models. (author)

  8. Understanding the Sales Process by Selling

    Science.gov (United States)

    Bussière, Dave

    2017-01-01

    Experiential projects bring students closer to real-world situations. This is valuable in sales education because the complexities of the sales process are difficult to learn from a textbook. A student project was developed that involved the selling of advertising space in a one-time newspaper insert. The project included a substantial minimum…

  9. The purchase decision process and involvement of the elderly regarding nonprescription products.

    Science.gov (United States)

    Reisenwitz, T H; Wimbish, G J

    1997-01-01

    The elderly or senior citizen is a large and growing market segment that purchases a disproportionate amount of health care products, particularly nonprescription products. This study attempts to examine the elderly's level of involvement (high versus low) and their purchase decision process regarding nonprescription or over-the-counter (OTC) products. Frequencies and percentages are calculated to indicate level of involvement as well as purchase decision behavior. Previous research is critiqued and managerial implications are discussed.

  10. Using project management techniques in hydro-relicensing

    International Nuclear Information System (INIS)

    Dominie, D.; Richard, J.

    1991-01-01

    This paper reports that to answer a pressing need for managing today's complex process and requirements of hydro relicensing, Central Maine Power Company has applied the principles of project management, including the use of computerized scheduling to its hydro relicensing efforts. This approach involves early inter-departmental cooperation in mapping out critical path scheduling by requiring the project team to: Outline the scope of the project in its entirety. Clarify and define components of the project. Quantify and categorize assumptions and dependencies. Identify constraints. The computer-generated schedule of this cooperative planning effort provides a graphic representation of the team's plan and become the focal point for refinements and adjustments necessary to complete an application on time. The use of project management techniques facilities team understanding of the realities and limitations in the relicensing process. These techniques encourage cooperative action, and use a solution-oriented process resulting in a product which can be a useful tool in communicating with resource agencies and regulators

  11. Financing Nuclear Projects. Case Study: Unit 2 Cernavoda NPP

    International Nuclear Information System (INIS)

    Chirica, Teodor; Constantin, Carmencita; Dobrin, Marian

    2003-01-01

    The implementation of a Nuclear Power Plant (NPP) is a major undertaking for all entities involved, due to the necessity of planning work and coordination of the implementation process of the different fields of interest, starting with the governmental authorities and ending with the public. Having in view the specific investment costs (relatively high) for a NPP, finding an adequate financing structure is possible through an iterative process that involves first an assessment of the technical performances of the project and secondly, the mathematical modelling of the financing structure effects on the projects. In this respect, the paper will be focused on the main steps needed in order to promote an investment project in nuclear field, starting with the decision phase, providing the documentation requested by the local and international authorities to promote the project and ending with the negotiation of the contracts (commercial contract, financing contract, purchase contract, etc). The case study will be focused on the phases achieved in order to promote the Unit 2 NPP Cernavoda completion works project. (authors)

  12. Financing nuclear projects. Case study: Unit 2 Cernavoda NPP

    International Nuclear Information System (INIS)

    Chirica, T.; Pall, S.; Lebedev, A.; Dobrin, M.

    2003-01-01

    The implementation of a Nuclear Power Plant (NPP) in a country is a major undertaking for all entities involved, due to the necessity of planning work and co-ordination of the implementation process of the different fields of interest, starting with the governmental authorities and ending with the people. Having in view the specific investment cost (relatively high) for a NPP, to find an adequate financing structure is possible through an iterative process that involves first an assessment of the technical performances of the project and second, the mathematical modelling of the financing structure effects on the project. In this respect, the paper proposed will be focused on the main steps needed in order to promote an investment project in nuclear field, starting with the decision phase, providing the documentations requested by the local and international authorities to promote the project and ending with the negotiation of the contracts (commercial contract, financing contract, power purchase contract, etc.) The case study will be focused on the phases achieved in order to promote the Unit 2 Cernavoda NPP completion works project. (author)

  13. Experiments for Multi-Stage Processes

    DEFF Research Database (Denmark)

    Tyssedal, John; Kulahci, Murat

    2015-01-01

    Multi-stage processes are very common in both process and manufacturing industries. In this article we present a methodology for designing experiments for multi-stage processes. Typically in these situations the design is expected to involve many factors from different stages. To minimize...... the required number of experimental runs, we suggest using mirror image pairs of experiments at each stage following the first. As the design criterion, we consider their projectivity and mainly focus on projectivity 3 designs. We provide the methodology for generating these designs for processes with any...

  14. VIP Project - Visual based intelligent process control. Final report; VIP Projekt - Visuell basierte intelligente Prozessfuehrung. Fachlicher Abschlussbericht

    Energy Technology Data Exchange (ETDEWEB)

    Moreno Rueda, R.

    2001-09-01

    This BMBF project comprised the development and testing of new process control strategies involving local resolution sensors and efficient simulation models. A system comprising a video section and a spectroscopic section is presented here. Further data can be processed in the master PC if desired. By analyzing every single burner, it is possible to analyze and optimize the complete combustion process. [German] Im Rahmen des BMBF-Projektes 'Visuell basierte Intelligente Prozessfuehrung fuer grosstechnische Feuerungsprozesse' wurden neuartige Prozessfuehrungsstrategien durch die Verbindung von ortsaufloesender Sensorik und leistungsfaehige Simulationsmodellen entwickelt und erprobt. Zur Loesung der gestellten Aufgaben wurde das hier dargestellte Gesamtsystem, bestehend aus Video- und Spektroskopie entwickelt. Ueber die Darstellung hinaus koennen im Master-PC auch die Daten weiterer Lanzen/Brenner verarbeitet werden. Die Vorortschraenke wie Kuehlmedien-Steuerschrank und Elektro-Steuerschrank koennen je nach Kesselabmassen auch fuer mehr als 2 Lanzen zusammengafasst werden. Durch die Betrachtung jedes einzelnen Brenners, wird es moeglich die Feuerung ganzheitlich und zeitgleich zu erfassen, zu beurteilen und zu optimieren. (orig.)

  15. The economics of project analysis: Optimal investment criteria and methods of study

    Science.gov (United States)

    Scriven, M. C.

    1979-01-01

    Insight is provided toward the development of an optimal program for investment analysis of project proposals offering commercial potential and its components. This involves a critique of economic investment criteria viewed in relation to requirements of engineering economy analysis. An outline for a systems approach to project analysis is given Application of the Leontief input-output methodology to analysis of projects involving multiple processes and products is investigated. Effective application of elements of neoclassical economic theory to investment analysis of project components is demonstrated. Patterns of both static and dynamic activity levels are incorporated.

  16. International environmental issues and requirements for new power projects

    Energy Technology Data Exchange (ETDEWEB)

    Newman, J.R. [Golder Associates Inc., Gainesville, FL (United States); Maltby, J.H. [Golder Associates Inc., Washington, DC (United States)

    1997-12-31

    The purpose of this presentation was to discuss the emerging role of financial entities in determining environmental requirements for international power projects. The paper outlines the following: emerging conditions; examples of announced privatization energy projects by country; types of government and international financial entity sources; problems for IPPs; similarity and differences between the World Bank and the USEPA; comparison of the international standards and regulations for power plants; recent trends/issues involving international power project approval; and recommendations for understanding/expediting the financial entities` environmental approval process and how to expedite this process.

  17. UMTRA Surface Project management action process document. Final report: Revision 1

    International Nuclear Information System (INIS)

    1996-04-01

    A critical mission of the US Department of Energy (DOE) is the planning, implementation, and completion of environmental restoration (ER) programs at facilities that were operated by or in support of the former Atomic Energy Commission (AEC) from the late 1940s into the 1970s. Among these facilities are the 24 former uranium mill sites designed in the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978 (42 USC section 7901 et seq.) Title 1 of the UMTRCA authorized the DOE to undertake remedial actions at these designated sites and associated vicinity properties (VP), which contain uranium mill tailings and other residual radioactive materials (RRM) derived from the processing sites. Title 2 of the UMTRCA addresses uranium mill sites that were licensed at the time the UMTRCA was enacted. Cleanup of these Title 2 sites is the responsibility of the licensees. The cleanup of the Title 1 sites has been split into two separate projects: the Surface Project, which deals with the mill buildings, tailings, and contaminated soils at the sites and VPs; and the Ground Water Project, which is limited to the contaminated ground water at the sites. This management action process (MAP) document discusses the Uranium Mill Tailings Remedial Action (UMTRA) Surface Project only; a separate MAP document has been prepared for the UMTRA Ground Water Project

  18. "Do-It-Ourselves Science": Case Studies of Volunteer-Initiated Citizen Science Involvement

    Science.gov (United States)

    Raddick, Jordan; Bracey, G.; Gay, P. L.

    2009-05-01

    Galaxy Zoo is a citizen science website in which members of the public volunteer to classify galaxies, thereby helping astronomers conduct publishable research into galaxy morphologies and environments. Although the site was originally created to answer a few specific questions, some members of the community - both scientists and volunteers - have spontaneously developed an interest in a wider variety of questions. Volunteers have pursued answers to these questions with guidance from professional astronomers; in completing these projects, volunteers have independently used some of the same data viewing and analysis tools that professional astronomers use, and have even developed their own online tools. They have created their own research questions and their own plans for data analysis, and are planning to write scientific papers with the results to be submitted to peer-reviewed scientific journals. Volunteers have identified a number of such projects. These volunteer-initiated projects have extended the scientific reach of Galaxy Zoo, while also giving volunteers first-hand experience with the process of science. We are interested in the process by which volunteers become interested in volunteer-initiated projects, and what tasks they participate in, both initially and as their involvement increases. What motivates a volunteer to become involved in a volunteer-initiated project? How does his or her motivation change with further involvement? We are conducting a program of qualitative education research into these questions, using as data sources the posts that volunteers have made to the Galaxy Zoo forum and transcripts of interviews with volunteers.

  19. The application of modern project management principles and processes in major nuclear decommissioning programmes

    International Nuclear Information System (INIS)

    Bayliss, C. R.

    2003-01-01

    The UKAEA has embarked upon an accelerated programme of decommissioning works. This has resulted in a review of its project management systems and processes. This paper describes these processes and their application to nuclear decommissioning and associated new build construction projects. Efficiencies from these processes are necessary. In addition this paper describes how UKAEA, where appropriate, utilizes modern forms of alliance contract so as to work in partnership with its contractors. (author)

  20. Rationale, Design, and Methods for Process Evaluation in the Childhood Obesity Research Demonstration Project.

    Science.gov (United States)

    Joseph, Sitara; Stevens, Andria M; Ledoux, Tracey; O'Connor, Teresia M; O'Connor, Daniel P; Thompson, Debbe

    2015-01-01

    The cross-site process evaluation plan for the Childhood Obesity Research Demonstration (CORD) project is described here. The CORD project comprises 3 unique demonstration projects designed to integrate multi-level, multi-setting health care and public health interventions over a 4-year funding period. Three different communities in California, Massachusetts, and Texas. All CORD demonstration projects targeted 2-12-year-old children whose families are eligible for benefits under Title XXI (CHIP) or Title XIX (Medicaid). The CORD projects were developed independently and consisted of evidence-based interventions that aim to prevent childhood obesity. The interventions promote healthy behaviors in children by applying strategies in 4 key settings (primary care clinics, early care and education centers, public schools, and community institutions). The CORD process evaluation outlined 3 main outcome measures: reach, dose, and fidelity, on 2 levels (researcher to provider, and provider to participant). The plan described here provides insight into the complex nature of process evaluation for consortia of independently designed multi-level, multi-setting intervention studies. The process evaluation results will provide contextual information about intervention implementation and delivery with which to interpret other aspects of the program. Copyright © 2015 Society for Nutrition Education and Behavior. All rights reserved.

  1. Data analysis and management for the Uranium Resource Evaluation Project

    International Nuclear Information System (INIS)

    Kane, V.E.

    1980-01-01

    The Department of Energy has funded a large data collection effort with the purpose of determining the US uranium resources. This Uranium Resource Evaluation (URE) Project required a large data management effort which involved collection, retrieval, processing, display, and analysis of large volumes of data. Many of the characteristics of this data processing system are relevant to other applications, particularly where routine processing involves analyses for input into numerous technical reports. The URE Project computing system has a modular program structure which has enabled a straightforward interface with both special and general graphics and analysis packages such as SAS, BMDP, and SURFACE II. Other topics include cost-effective computing, data quality, report quality computer output, and test versus production program development

  2. Metals and Alloys Material Stabilization Process Plan

    Energy Technology Data Exchange (ETDEWEB)

    RISENMAY, H.R.; BURK, R.A.

    2000-05-18

    This Plan outlines the process for brushing metal and alloys in accordance with the path forward discussed in the Integrated Project Management Plan for the Plutonium Finishing Plant Stabilization and Deactivation Project, HNF-3617, and requirements set forth in the Project Management Plan for Materials Stabilization, HNF-3605. This plan provides the basis for selection of the location to process, the processes involved, equipment to be used, and the characterization of the contents of the can. The scope of the process is from retrieval of metals and alloys from storage to transfer back to storage in a repackaged configuration.

  3. Metals and Alloys Material Stabilization Process Plan

    International Nuclear Information System (INIS)

    RISENMAY, H.R.; BURK, R.A.

    2000-01-01

    This Plan outlines the process for brushing metal and alloys in accordance with the path forward discussed in the Integrated Project Management Plan for the Plutonium Finishing Plant Stabilization and Deactivation Project, HNF-3617, and requirements set forth in the Project Management Plan for Materials Stabilization, HNF-3605. This plan provides the basis for selection of the location to process, the processes involved, equipment to be used, and the characterization of the contents of the can. The scope of the process is from retrieval of metals and alloys from storage to transfer back to storage in a repackaged configuration

  4. The Plasma Hearth Process demonstration project for mixed waste treatment

    International Nuclear Information System (INIS)

    Geimer, R.; Dwight, C.; McClellan, G.

    1994-01-01

    The Plasma Hearth Process (PHP) demonstration project is one of the key technology projects in the Department of Energy (DOE) Office of Technology Development (OTD) Mixed Waste Integrated Program (MWIP). Testing to date has yielded encouraging results in displaying potential applications for the PHP technology. Early tests have shown that a wide range of waste materials can be readily processed in the PHP and converted to a vitreous product. Waste materials can be treated in their original container as received at the treatment facility, without pretreatment. The vitreous product, when cooled, exhibits excellent performance in leach resistance, consistently exceeding the Environmental Protection Agency (EPA) Toxicity Characteristic Leaching Procedure (TCLP) requirements. Performance of the Demonstration System during test operations has been shown to meet emission requirements. An accelerated development phase, being conducted at both bench- and pilot-scale on both nonradioactive and radioactive materials, will confirm the viability of the process. It is anticipated that, as a result of this accelerated technology development and demonstration phase, the PHP will be ready for a final field-level demonstration within three years

  5. Cochlear Implant: the complexity involved in the decision making process by the family.

    Science.gov (United States)

    Vieira, Sheila de Souza; Bevilacqua, Maria Cecília; Ferreira, Noeli Marchioro Liston Andrade; Dupas, Giselle

    2014-01-01

    to understand the meanings the family attributes to the phases of the decision-making process on a cochlear implant for their child. qualitative research, using Symbolic Interactionism and Grounded Theory as the theoretical and methodological frameworks, respectively. Data collection instrument: semistructured interview. Nine families participated in the study (32 participants). knowledge deficit, difficulties to contextualize benefits and risks and fear are some factors that make this process difficult. Experiences deriving from interactions with health professionals, other cochlear implant users and their relatives strengthen decision making in favor of the implant. deciding on whether or not to have the implant involves a complex process, in which the family needs to weigh gains and losses, experience feelings of accountability and guilt, besides overcoming the risk aversion. Hence, this demands cautious preparation and knowledge from the professionals involved in this intervention.

  6. The national conversion pilot project

    International Nuclear Information System (INIS)

    Van Der Puy, M.; Francis, G.; Konczal, M.

    1994-01-01

    The Department of Energy is now faced with the prospect of terminating traditional defense production missions at several Department of Energy sites. Because of this, there is a critical need to develop a DOE process to convert former defense production facilities to private use so that underutilized workers and facilities may be used to minimize the impact on the United States economy. The purpose of the National Conversation Pilot Project (NCPP) at Rocky Flats near Denver, Colorado is to explore and demonstrate the feasibility of economic conversion of DOE facilities, in a manner consistent with ongoing site waste management and cleanup activities, and non-prejudicial to future land use planning decisions. The NCPP is divided into three stages: The first stage, now under way, is one of detailed planning for cleanup and building maintenance activities. The second stage involves building cleanup necessary to support the proposed industrial activities, maintenance of equipment and building infrastructure necessary to assure protection of human health and the environment, declassification work, and some small scale research and development activities. Stage III would involve DOE metals recycling. Specific approval from the DOE is required prior to each project stage. To ensure stakeholder involvement, a steering committee will advise the DOE on the desirability to proceed with the project from stage to stage. A key question in the conversion process is whether a competitive economic and regulatory environment can be created on a DOE facility, allowing an onsite conversion business to effectively compete with offsite businesses. If successful, the Rocky Flats project could become the model for economic conversion at other DOE facilities

  7. Learning from doing the EquitAble project: Content, context, process, and impact of a multi-country research project on vulnerable populations in Africa

    Directory of Open Access Journals (Sweden)

    Mac MacLachlan

    2014-10-01

    Objectives: This article reports on the content, context, process and impact of project EquitAble, funded by the European Commission Seventh Research Framework Programme, which brought together researchers from Ireland, Norway, South Africa, Namibia, Sudan and Malawi. Method: After the 4-year project ended in February 2013, all members of the consortium were asked to anonymously complete a bespoke questionnaire designed by the coordinating team. The purpose of the questionnaire was to capture the views of those who collaborated on the research project in relation to issues of content, context, process and impact of the EquitAble project. Results: Our results indicated some of the successes and challenges encountered by our consortium. Conclusion: We identified contextual and process learning points, factors often not discussed in papers, which typically focus on the reporting of the ‘content’ of results.

  8. NHDOT : process for municipally managed state aid highway program projects

    Science.gov (United States)

    2006-05-23

    The design and construction of Municipally Managed State Aid Highway Program projects must comply with the requirements in this guideline in order to receive State Aid under the applicable provisions of RSA 235. Under this process, State Aid Construc...

  9. pep-up: a review of the umgeni valley pro.ject evaluation process

    African Journals Online (AJOL)

    The evaluation process at the Umgeni Valle~ Project is.described. Its evolution, background and ... mental Education circles in Southern Africa. The ... t? the percei~ed need for evaluation of the Umgen1 Valley ProJect. ... This group, insisting that they were facilitating .... Phase : An integrated summary of all fielc and working ...

  10. Federal/State cooperation in the licensing of a nuclear power project. A joint licensing process between the US Nuclear Regulatory Commission and the Washington State Energy Facility Site Evaluation Council

    International Nuclear Information System (INIS)

    1984-05-01

    This report summarizes and documents a joint environmental review and licensing process established between the US Nuclear Regulatory Commission (NRC) and the Washington State Energy Facility Site Evaluation Council (EFSEC) in 1980-1983 for the Skagit/Hanford Nuclear Project (S/HNP). It documents the agreements made between the agencies to prepare a joint environmental impact statement responsive to the requirements of the National Environmental Policy Act of 1969 (NEPA) and the Washington State Environmental Policy Act. These agreements also established protocol to conduct joint public evidentiary hearings on matters of mutual jurisdiction, thereby reducing the duplication of effort and increasing the efficiency of the use of resources of federal and state governments and other entities involved in the process. This report may provide guidance and rationale to licensing bodies that may wish to adopt some of the procedures discussed in the report in the event that they become involved in the licensing of a nuclear power plant project. The history of the S/HNP and of the agreement processes are discussed. Discussions are provided on implementing the joint review process. A separate section is included which presents independent evaluations of the process by the applicant, NRC, and EFSEC

  11. A critical analysis of the implementation of service user involvement in primary care research and health service development using normalization process theory.

    Science.gov (United States)

    Tierney, Edel; McEvoy, Rachel; O'Reilly-de Brún, Mary; de Brún, Tomas; Okonkwo, Ekaterina; Rooney, Michelle; Dowrick, Chris; Rogers, Anne; MacFarlane, Anne

    2016-06-01

    There have been recent important advances in conceptualizing and operationalizing involvement in health research and health-care service development. However, problems persist in the field that impact on the scope for meaningful involvement to become a routine - normalized - way of working in primary care. In this review, we focus on current practice to critically interrogate factors known to be relevant for normalization - definition, enrolment, enactment and appraisal. Ours was a multidisciplinary, interagency team, with community representation. We searched EBSCO host for papers from 2007 to 2011 and engaged in an iterative, reflexive approach to sampling, appraising and analysing the literature following the principles of a critical interpretive synthesis approach and using Normalization Process Theory. Twenty-six papers were chosen from 289 papers, as a purposeful sample of work that is reported as service user involvement in the field. Few papers provided a clear working definition of service user involvement. The dominant identified rationale for enrolling service users in primary care projects was linked with policy imperatives for co-governance and emancipatory ideals. The majority of methodologies employed were standard health services research methods that do not qualify as research with service users. This indicates a lack of congruence between the stated aims and methods. Most studies only reported positive outcomes, raising questions about the balance or completeness of the published appraisals. To improve normalization of meaningful involvement in primary care, it is necessary to encourage explicit reporting of definitions, methodological innovation to enhance co-governance and dissemination of research processes and findings. © 2014 The Authors Health Expectations Published by John Wiley & Sons Ltd.

  12. Subarray Processing for Projection-based RFI Mitigation in Radio Astronomical Interferometers

    Science.gov (United States)

    Burnett, Mitchell C.; Jeffs, Brian D.; Black, Richard A.; Warnick, Karl F.

    2018-04-01

    Radio Frequency Interference (RFI) is a major problem for observations in Radio Astronomy (RA). Adaptive spatial filtering techniques such as subspace projection are promising candidates for RFI mitigation; however, for radio interferometric imaging arrays, these have primarily been used in engineering demonstration experiments rather than mainstream scientific observations. This paper considers one reason that adoption of such algorithms is limited: RFI decorrelates across the interferometric array because of long baseline lengths. This occurs when the relative RFI time delay along a baseline is large compared to the frequency channel inverse bandwidth used in the processing chain. Maximum achievable excision of the RFI is limited by covariance matrix estimation error when identifying interference subspace parameters, and decorrelation of the RFI introduces errors that corrupt the subspace estimate, rendering subspace projection ineffective over the entire array. In this work, we present an algorithm that overcomes this challenge of decorrelation by applying subspace projection via subarray processing (SP-SAP). Each subarray is designed to have a set of elements with high mutual correlation in the interferer for better estimation of subspace parameters. In an RFI simulation scenario for the proposed ngVLA interferometric imaging array with 15 kHz channel bandwidth for correlator processing, we show that compared to the former approach of applying subspace projection on the full array, SP-SAP improves mitigation of the RFI on the order of 9 dB. An example of improved image synthesis and reduced RFI artifacts for a simulated image “phantom” using the SP-SAP algorithm is presented.

  13. Influence of Selected Stakeholders of Construction Investment Projects on the Course of Project

    Science.gov (United States)

    Bizon-Górecka, Jadwiga; Górecki, Jarosław

    2017-10-01

    The article presents an entity perspective of the construction investment projects. In a course of the project there are stakeholders who have an indirect influence (e.g. decision-makers in the selection of projects) or a direct influence (e.g. members of the project team). An intuitive opinion about a significant influence of project stakeholders on the project’s course encouraged the authors to undertake a research in this area. The article illustrates the initial phases of the construction project life cycle in a perspective of the entities and, in particular, a role of different stakeholders in making decisions that affect a course of the project. An analysis of the structure of the construction project life cycle makes a substantial involvement of various subjects in the initial phases of the project, i.e. in an initial phase and during a creation of the structures. A key point is to underline the factors of decision-making by the participants of the construction process. It was indicated that the stakeholders have a different impact on the course of the project. In large projects, which have many stakeholders, their role in the implementation of the investment project can vary, depending on the life cycle of the project. They can have positive or negative impacts on achieving the project objectives. The paper presents the results of 100 surveys made among participants of the building processes, executors of the construction projects in the Kuyavian-Pomeranian region. The study was conducted in December 2016 and January 2017. It revealed what is the impact of individual stakeholders of the construction projects on the course of the project. A special attention was paid to a complex relationship between objectives of the project and stakeholders’ goals. A great care to the smallest possible number of risks, which may arise from the different objectives of the project and its stakeholders’ goals, should be focused on the augmentation of correlation of

  14. Descending projections from the dysgranular zone of rat primary somatosensory cortex processing deep somatic input.

    Science.gov (United States)

    Lee, Taehee; Kim, Uhnoh

    2012-04-01

    In the mammalian somatic system, peripheral inputs from cutaneous and deep receptors ascend via different subcortical channels and terminate in largely separate regions of the primary somatosensory cortex (SI). How these inputs are processed in SI and then projected back to the subcortical relay centers is critical for understanding how SI may regulate somatic information processing in the subcortex. Although it is now relatively well understood how SI cutaneous areas project to the subcortical structures, little is known about the descending projections from SI areas processing deep somatic input. We examined this issue by using the rodent somatic system as a model. In rat SI, deep somatic input is processed mainly in the dysgranular zone (DSZ) enclosed by the cutaneous barrel subfields. By using biotinylated dextran amine (BDA) as anterograde tracer, we characterized the topography of corticostriatal and corticofugal projections arising in the DSZ. The DSZ projections terminate mainly in the lateral subregions of the striatum that are also known as the target of certain SI cutaneous areas. This suggests that SI processing of deep and cutaneous information may be integrated, to a certain degree, in this striatal region. By contrast, at both thalamic and prethalamic levels as far as the spinal cord, descending projections from DSZ terminate in areas largely distinguishable from those that receive input from SI cutaneous areas. These subcortical targets of DSZ include not only the sensory but also motor-related structures, suggesting that SI processing of deep input may engage in regulating somatic and motor information flow between the cortex and periphery. Copyright © 2011 Wiley-Liss, Inc.

  15. Ghrelin fibers from lateral hypothalamus project to nucleus tractus solitaries and are involved in gastric motility regulation in cisplatin-treated rats.

    Science.gov (United States)

    Gong, Yanling; Liu, Yang; Liu, Fei; Wang, Shasha; Jin, Hong; Guo, Feifei; Xu, Luo

    2017-03-15

    Ghrelin can alleviate cancer chemotherapy-induced dyspepsia in rodents, though the neural mechanisms involved are not known. Therefore, ghrelin projections from the lateral hypothalamus (LH) and its involvement in the regulation of gastric motility in cisplatin-treated rats were investigated with a multi-disciplined approach. Retrograde tracing combined with fluoro-immunohistochemical staining were used to investigate ghrelin fiber projections arising from LH and projecting to nucleus tractus solitaries (NTS). Results revealed that ghrelin fibers originating in LH project to NTS. Expression of ghrelin and its receptor growth hormone secretagogue receptor (GHS-R1a) in LH and NTS were detected by Western Blot. 2days after cisplatin dosing, expression of ghrelin in LH decreased while GHS-R1a in both LH and NTS increased. In electrophysiological experiments, the effects of N-methyl-d-aspartate (NMDA) microinjection in LH on neuronal discharge of gastric distension-responsive neurons in NTS and gastric motility were assessed. NMDA in LH excited most of ghrelin-responsive gastric distension (GD)-sensitive neurons in NTS and promoted gastric motility. This effect was partially blocked by ghrelin antibody in NTS. Furthermore, the excitatory effects of NMDA in cisplatin-treated rats were weaker than those in saline-treated rats. Behaviorally, cisplatin induced a significant increase of kaolin consumption and decrease of food intake. These studies reveal a decreased expression of ghrelin in LH and up-regulation of GHS-R1a in LH and NTS, which are involved in the regulation of GD neuronal discharge in NTS and gastric motility. Copyright © 2017 Elsevier B.V. All rights reserved.

  16. Saturated Zone Flow and Transport Expert Elicitation Project

    Energy Technology Data Exchange (ETDEWEB)

    Coppersmith, Kevin J.; Perman, Roseanne C.

    1998-01-01

    This report presents results of the Saturated Zone Flow and Transport Expert Elicitation (SZEE) project for Yucca Mountain, Nevada. This project was sponsored by the US Department of Energy (DOE) and managed by Geomatrix Consultants, Inc. (Geomatrix), for TRW Environmental Safety Systems, Inc. The DOE's Yucca Mountain Site Characterization Project (referred to as the YMP) is intended to evaluate the suitability of the site for construction of a mined geologic repository for the permanent disposal of spent nuclear fuel and high-level radioactive waste. The SZEE project is one of several that involve the elicitation of experts to characterize the knowledge and uncertainties regarding key inputs to the Yucca Mountain Total System Performance Assessment (TSPA). The objective of the current project was to characterize the uncertainties associated with certain key issues related to the saturated zone system in the Yucca Mountain area and downgradient region. An understanding of saturated zone processes is critical to evaluating the performance of the potential high-level nuclear waste repository at Yucca Mountain. A major goal of the project was to capture the uncertainties involved in assessing the saturated flow processes, including uncertainty in both the models used to represent the physical processes controlling saturated zone flow and transport, and the parameter values used in the models. So that the analysis included a wide range of perspectives, multiple individual judgments were elicited from members of an expert panel. The panel members, who were experts from within and outside the Yucca Mountain project, represented a range of experience and expertise. A deliberate process was followed in facilitating interactions among the experts, in training them to express their uncertainties, and in eliciting their interpretations. The resulting assessments and probability distributions, therefore, provide a reasonable aggregate representation of the knowledge and

  17. Planning and leading of the technological processes by mechanical working with microsoft project

    Science.gov (United States)

    Nae, I.; Grigore, N.

    2016-08-01

    Nowadays, fabrication systems and methods are being modified; new processing technologies come up, flow sheets develop a minimum number of phases, the flexibility of the technologies grows up, new methods and instruments of monitoring and leading the processing operations also come up. The technological course (route, entry, scheme, guiding) referring to the series of the operation, putting and execution phases of a mark in order to obtain the final product from the blank is represented by a sequence of activities realized by a logic manner, on a well determined schedule, with a determined budget and resources. Also, a project can be defined as a series of specific activities, methodical structured which they aim to finish a specific objective, within a fixed schedule and budget. Within the homogeneity between the project and the technological course, this research is presenting the defining of the technological course of mechanical chip removing process using Microsoft Project. Under these circumstances, this research highlights the advantages of this method: the celerity using of other technological alternatives in order to pick the optimal process, the job scheduling being constrained by any kinds, the standardization of some processing technological operations.

  18. Peer Assessment in Engineering Group Projects

    DEFF Research Database (Denmark)

    Triantafyllou, Eva; Timcenko, Olga

    2014-01-01

    Peer review has proved to be beneficial in project-based environments by involving students in the process and encouraging them to take ownership of their learning. This article reviews how peer assessment has been employed within group work for different engineering programs. Since the administr...

  19. Recording and accounting for stakeholder involvement in systematic reviews.

    Science.gov (United States)

    Saan, Marieke C; Boeije, Hennie R; Sattoe, Jane N T; Bal, Marjolijn I; Missler, Marjolein; van Wesel, Floryt

    2015-06-01

    The use of stakeholders in systematic reviews is increasingly valued, but their influence on the systematicity of the review is often unclear. The aim of this study was to describe some of the processes of involvement of stakeholders and to demonstrate a Tool for Recording and Accounting for Stakeholder Involvement (TRASI). We demonstrate the TRASI in two worked examples. In one project, the reviewers collaborated with the end-user and an expert during the literature search. In the other project, experts were consulted to generate keywords before searching the literature. In the first project, disagreements about keywords to identify studies for the research topic were solved by informal discussion. In the second project, difficulties arose in reaching agreement between experts and reviewers about the core construct and the meaningful keywords associated with it. The TRASI aids researchers to systematically and transparently account for the decisions taken. The TRASI supports information specialists and librarians to shape the search strategy to match the objectives of the review. We propose the TRASI as a first step in resolving the challenges of detecting and reconstructing stakeholder influences. Potential new applications of the TRASI are discussed. © 2015 Health Libraries Group.

  20. Using Group Projects to Teach Process Improvement in a Quality Class

    Science.gov (United States)

    Neidigh, Robert O.

    2016-01-01

    This paper provides a description of a teaching approach that uses experiential learning to teach process improvement. The teaching approach uses student groups to perform and gather process data in a senior-level quality management class that focuses on Lean Six Sigma. A strategy to link the experiential learning in the group projects to the…

  1. Domain general sequence operations contribute to pre-SMA involvement in visuo-spatial processing

    Directory of Open Access Journals (Sweden)

    E. Charles eLeek

    2016-01-01

    Full Text Available This study used 3T MRI to elucidate the functional role of supplementary motor area (SMA in relation to visuo-spatial processing. A localizer task contrasting sequential number subtraction and repetitive button pressing was used to functionally delineate non-motor sequence processing in pre-SMA, and activity in SMA-proper associated with motor sequencing. Patterns of BOLD responses in these regions were then contrasted to those from two tasks of visuo-spatial processing. In one task participants performed mental rotation in which recognition memory judgments were made to previously memorized 2D novel patterns across image-plane rotations. The other task involved abstract grid navigation in which observers computed a series of imagined location shifts in response to directional (arrow cues around a mental grid. The results showed overlapping activation in pre-SMA for sequential subtraction and both visuo-spatial tasks. These results suggest that visuo-spatial processing is supported by non-motor sequence operations that involve pre-SMA. More broadly, these data further highlight the functional heterogeneity of pre-SMA, and show that its role extends to processes beyond the planning and online control of movement.

  2. Controlling the Instructional Development Process. Training Development and Research Center Project Number Fifteen.

    Science.gov (United States)

    Sleezer, Catherine M.; Swanson, Richard A.

    Process control is a way of training managers in business and industry to plan, monitor, and communicate the instructional development process of training projects. Two simple and useful tools that managers use in controlling the process of instructional development are the Process Control Planning Sheet and the Process Control Record. The Process…

  3. Cochlear Implant: the complexity involved in the decision making process by the family

    Directory of Open Access Journals (Sweden)

    Sheila de Souza Vieira

    2014-06-01

    Full Text Available OBJECTIVE: to understand the meanings the family attributes to the phases of the decision-making process on a cochlear implant for their child.METHOD: qualitative research, using Symbolic Interactionism and Grounded Theory as the theoretical and methodological frameworks, respectively. Data collection instrument: semistructured interview. Nine families participated in the study (32 participants.RESULTS: knowledge deficit, difficulties to contextualize benefits and risks and fear are some factors that make this process difficult. Experiences deriving from interactions with health professionals, other cochlear implant users and their relatives strengthen decision making in favor of the implant.CONCLUSION: deciding on whether or not to have the implant involves a complex process, in which the family needs to weigh gains and losses, experience feelings of accountability and guilt, besides overcoming the risk aversion. Hence, this demands cautious preparation and knowledge from the professionals involved in this intervention.

  4. The DIALOGUE project. Report of the Gaming group on the structure and content of the project

    International Nuclear Information System (INIS)

    Andersson, Johan; Hallencreutz, M.; Andersson, Kjell; Wene, C.O.; Westerlund, S.

    1993-11-01

    The DIALOGUE project has been conducted by the Swedish Nuclear Power Inspectorate (SKI) since 1990. The aim of the project was to stimulate a dialogue between different interest groups within Sweden. The purpose of this dialogue was to establish a licensing process, prior to a future licensing of a repository for spent nuclear waste, in which several of the parties involved are reasonably confident. The DIALOGUE project was carried out with the participation of other government agencies, municipalities and environmental groups and was headed by the former chairman of the National Licensing Board for Environmental Protection

  5. Recent progress of the waste processing and disposal projects within the Underground Storage Tank-Integrated Demonstration

    International Nuclear Information System (INIS)

    Hunt, R.D.; McGinnis, C.P.; Cruse, J.M.

    1994-01-01

    The US Department of Energy (DOE) Office of Environmental Restoration and Waste Remediation has created the Office of Technology Development (OTD) to provide new and improved remediation technologies for the 1 x 10 8 gal of radioactive waste in the underground storage tanks (USTs) at five DOE sites. The OTD established and the Underground Storage Tank-Integrated Demonstration (UST-ID) to perform demonstrations, tests, and evaluations on these new technologies before these processes are transferred to the tank sites for use in full-scale remediation of the USTs. The UST-ID projects are performed by the Characterization and Waste Retrieval Program or the Waste Processing and Disposal Program (WPDP). During FY 1994, the WPDP is funding 12 projects in the areas of supernate processing, sludge processing, nitrate destruction, and final waste forms. The supernate projects are primarily concerned with cesium removal. A mobile evaporator and concentrator for cesium-free supernate is also being demonstrated. The sludge projects are emphasizing sludge dissolution and the evaluation of the TRUEX and diamide solvent extraction processes for transuranic waste streams. One WPDP project is examining both supernate and sludge processes in an effort to develop a system-level plan for handling all UST waste. The other WPDP studies are concerned with nitrate and organic destruction as well as subsequent waste forms. The current status of these WPDP projects is presented

  6. EMPLOYEE INVOLVEMENT IN A CHANGE PROCESS - A CASE STUDY FOR ROMANIAN ORGANIZATIONS

    Directory of Open Access Journals (Sweden)

    Prediscan Mariana

    2015-07-01

    Full Text Available Innovation, competitive advantage, change are some concepts that should be on every organization's agenda, due to the fact the global market leads to global competition so in order to increase the market share, turnover or profit organizations have to incorporate those concepts in their strategies. The outside environment is very unstable and things are evolving very fast so managers from all levels have to acknowledge the importance of change and to identify as soon as possible several new ideas that should be the subject of different change processes. Openness to organizational change has become a mandatory feature for those organizations that want to survive and adapt to the external pressure, helping them to be efficient. Even if in many cases managers are the initiators of change, this process is very complex and needs support and involvement from all the members of the organization, so the employee's attitude and commitment to change is crucial. In many cases employees have a negative attitude towards change and manifest a strong resistance, due to the fact that they are not consulted and are not involved in the process of the identification for the need of change. Without understanding and knowing very well what it is expected from them, employees are afraid of the unknown and prefer to perform their tasks as they did before. Creating a climate and a culture for change is very important, because like this change will be something normal, continuous and people will feel comfortable with any change initiatives, without being surprised, confused or scared. Even if any change process should improve the current state of the organization, sometimes change efforts fail because the ones that resist change are stronger than the ones supporting change. The purpose of this paper is to analyze how often are Romanian employees involved in the processes of change and how important is the role they play. We have also tried to see the Romanian manager

  7. Decision Process Analysis on Project Priority Strategy: A Case Study of an ICT Design Firm

    Directory of Open Access Journals (Sweden)

    Vincent F. Yu

    2014-01-01

    Full Text Available Project priority strategy is the benchmarking of a corporate operation management strategy and in particular is used by a projects-based research and development firm in the complex competence environment of the information and communication technology (ICT industry. This research takes the variables of external environments and internal resources into account for a firm’s market, technology, and finance assets in order to present a decision process on a project priority strategy. This empirical study also addresses the key factors of the interaction between business on a project development’s supply chain: clients, the examined firm, and suppliers. The findings indicate that a profit-driven project can dominate the firm’s strategic operations and management from the resource-based view and analytic hierarchy process technique perspectives. At the same time, the analysis results contribute significant values to project decision management, which is highly recommended for small-medium enterprises conducting product/project development, project portfolio management, and strategic business management.

  8. Document Management Projects: implementation guide

    OpenAIRE

    Beatriz Bagoin Guimarães

    2016-01-01

    Records Management System implementation is a complex process that needs to be executed by a multidisciplinary team and involves components of apparently non-related areas such as archival science, computer engineering, law, project management and human resource management. All of them are crucial and complementary to guarantee a full and functional implementation of a system and a perfect fusion with the connected processes and procedures. The purpose of this work is to provide organizations...

  9. The process behind the project 'houses without heating system' in Goeteborg, Sweden

    Energy Technology Data Exchange (ETDEWEB)

    Glad, Wiktoria [Linkoeping Univ. (Sweden). The Tema Inst., Dept. of Technology and Social Change

    2003-07-01

    In the outskirts of Goeteborg, Sweden, twenty terrace houses were constructed throughout 2001. The spectacular thing about these houses is that no traditional heating systems were installed. The commercial's catch phrase is: 'Houses without heating systems'. Following this project from the beginning and through the whole process, including the long planning procedure (between 1997-1999), the professional actors (the initiator, the building proprietor, the contractor and the researchers), come into focus. This is a unique project in Sweden and has not yet had any follow-up developments. The evaluation, mainly including measurements, is being conducted by a research Inst. and will be finalised in 2003. The theoretical approach is as described in socio-technical system and focuses on social and technical components. The point of departure for the study is the social subsystem and the process behind the project which is important in understanding the final outcome. The study focuses on how and why this project was conducted. Initially, one person's ideas, inspired by building projects abroad were crucial. These ideas were then spread to a network constituting of researchers, the building proprietor, the contractor and the builders, and other consultants. The process can be described as a social innovation since a new concept for heating in buildings is introduced by focusing on the planning process and new participating actors.

  10. [Analysis of projects funded by NSFC in field of processing Chinese materia medica in recent five years].

    Science.gov (United States)

    Chen, Lei; Xia, Xing; He, Bo-sai; Hah, Li-wei

    2015-05-01

    The general situation of the approved and concluded projects of National Natural Science Foundation of China in the field of processing Chinese Materia Medica in recent five years has been reviewed. The progresses and achievements of some projects have been summarized in accordance with research area such as the processing principle, the processing technology, quality evaluation, toxicity and safety evaluation, etc. The researchers and project support units of the funded projects have been analyzed, and the problems of the applications have been also summarized.

  11. Project management of radwaste retrofits

    International Nuclear Information System (INIS)

    Vaught, D.L.

    1988-01-01

    Many utilities are finding it necessary to provide additional radioactive waste processing facilities at operating or nearly completed nuclear stations in order to accommodate the ever-changing regulatory, political and socio-economic environment in which we operate. This paper describes the project approach taken at Duke Power Company to provide a comprehensive radioactive waste processing facility at Oconee Nuclear Station. Following a historical perspective, the philosophy and mechanics of the project team are discussed. The goal of the project team was to provide a facility which could meet the liquid and solid radioactive waste processing needs of Oconee within the restraints of a utility budget and schedule. The unique quality of the project team approach was the integral involvement of all of the necessary departments in every part of the design, construction and start-up phases. The project team thereby utilized feedback from over thirty reactor years of operational experience. The remainder of the paper provides examples of the problems encountered and their resolution (eg. equipment layout, materials handling, vendor improvements and regulatory changes all required design-in-progress changes). It has been the integration and concentration of the diverse resources of a large utility into a cross-departmental team which has allowed the timely resolution of the necessary changes. This same philosophy is being applied to the facility start-up program and to other major projects at Duke Power Company

  12. The realization of three special photovoltaic (PV) pilot projects. The roles and learning experiences of parties involved

    International Nuclear Information System (INIS)

    Geuzendam, C.; Van Mierlo, B.

    1995-11-01

    Experiences with the following three demonstration projects, carried out in the Netherlands, are inventorized and evaluated: (1) 16 private grid-connected PV-systems in existing houses within the framework of the project of the Organization for Renewable Energy (ODE, abbreviated in Dutch); (2) five private grid-connected roof-integrated PV-systems in renovated buildings in Leiden; and (3) the integration of PV in an acoustic baffle along the high-way A-27 near De Bilt. Attention is paid to the decision making processes, the most important actors, the management of the projects and what is learned from the experiences

  13. Tightening the Purchasing Process: Superintendents Get More Involved in Buying Policies

    Science.gov (United States)

    Rivero, Victor

    2009-01-01

    Over the last 18 months, school district purchasing offices across the country have been tightening the reins like never before while more top-level administrators get involved in the budget process. "When the economy really hit the skids, states got hit hard, so a lot of school districts were forced to make severe budget cuts," says John Musso,…

  14. Evaluation of the application process of FATIH project: Students’ views

    Directory of Open Access Journals (Sweden)

    Abdullah Kuzu

    2013-12-01

    Full Text Available The purpose of this study was to find out the students’views about the innovations brought about by FATIH Project. The research data were collected via field notes, in-class observations made in 10 class hours and focus group interviews held with 45 students participating in the study on voluntary basis from five state schools located in the cities of Ankara, Karaman, Mersin (2 and Uşak. Within the scope of the study the data were analyzed with the content analysis method. It was found out the innovations brought about by FATIH Project led to positive changes in students’ interest and willingness in classes, their achievement levels, their motivations, their pace of learning, their technology use and research skills, permanency in their learning and their self-confidence. The students reported that the negative changes included distraction of students’ attention to classes, limitation in face-to-face communication with the teacher, the slowing pace of teaching, time-taking classes, confidence problems, the teacher’s increasing desire to control students and difficulty in class-management.It was also revealed that use of tablets for a long time resulted in eye diseases and headaches and that the project helped the students instantly reach the information they needed, contributed to their motivation in learning yet had negative influence on their socialization. It was found that the students felt themselves privileged as they were involved in the project; that they were pleased as the classes were taught in a more entertaining manner; and that inefficient content and interaction problems between the interactive whiteboard and tablet computers were considered to be negative consequences of the innovations brought about by the project.

  15. Amoco-US Environmental Protection Agency, pollution prevention project, Yorktown, Virginia: Project peer review. Report of the Peer Review Committee of the Amoco/EPA Pollution Prevention Project at the Yorktown, Virginia refinery

    International Nuclear Information System (INIS)

    Klee, H.; Podar, M.

    1991-01-01

    The Amoco/EPA Pollution Prevention Project involved a number of representatives from federal and Virginia regulatory agencies, and Amoco's refining business. Participants believed that the Project could benefit from a broader perspective than these organizations along might provide. The Project Work Group selected an independent Peer Review Process which was conducted by Resource for the Future (RFF), a Washington DC think tank. A group of technical, policy and environmental experts from diverse backgrounds served as Peer Review members. The Peer Review Committee met on three occasions to discuss (1) the Project Work Plan (2) sampling data and interpretation and (3) project conclusions and recommendations. The focus of the meeting was on the general scope and content of the project

  16. Experience and meaning of user involvement: some explorations from a community mental health project.

    Science.gov (United States)

    Truman, Carole; Raine, Pamela

    2002-05-01

    With an increased interest in and policy commitment to involving service users in the planning and delivery of health service provision, there is a clear need to explore both the rhetoric and realities of what user involvement entails. In the present paper, by drawing upon an evaluation of a community-based exercise facility for people with mental health problems, the authors explore ways in which the reality of user involvement is subject to a range of configurations within health services. The paper describes a piece of qualitative research that was undertaken within a participatory framework to explore the nature of user involvement within the facility. The data have been analysed using a grounded theory approach to provide insights into: the organisational context in which user involvement takes place; factors which encourage meaningful participation on the part of service users; perceived barriers to user involvement; and issues of sustainability and continuity. This research approach has enabled the authors to explore the views and experiences of users, service providers and referral agencies in relation to the nature and potential for user involvement. The findings illustrate ways in which user involvement may take place under both flexible and formal arrangements across a variety of activities. The present paper provides an account of some of the meanings and experiences of what 'successful' user participation may involve and the conditions which underpin 'success'. The authors conclude that successful and meaningful user involvement should enable and support users to recognise their existing skills, and to develop new ones, at a pace that suits their particular circumstances and personal resources. This process may require adaptation not only by organisations, but also by service providers and non-involved users.

  17. Examining the Interrelationship among Critical Success Factors of Public Private Partnership Infrastructure Projects

    Directory of Open Access Journals (Sweden)

    Shiying Shi

    2016-12-01

    Full Text Available Examining the interrelationships among critical success factors (CSFs for public private partnership (PPP projects is of importance for improving PPP project performance and maintaining the sustainability of PPP project implementation. Previous studies mostly focused on the identification of the CSFs for PPP projects; limited studies investigated the interrelationships among CSFs. Hence, the research objectives are (a to determine the interrelationships among CSFs of PPP projects taking into account the public and (b to identify influence paths contributing to take advantage of CSFs in the process of PPP implementation. A literature review and expert interviews were adopted to construct the CSFs framework; nine hypotheses were constructed and tested by the structural equation modelling (SEM based on the data collected from a questionnaire survey. This research reveals that the relationship between public and private partners is the leader-follower relationship, not the partnership relationship, in PPP projects, indicating that the responsibilities, power or resources existing among partners are very unequal. It also highlights that public involvement has a negative effect on the process of service provisions, and costs and risks exist in the process of public involvement in PPP projects. The determined interrelationships among CSFs will contribute to the sustainability and success of a PPP project.

  18. Understanding the cognitive processes involved in writing to learn.

    Science.gov (United States)

    Arnold, Kathleen M; Umanath, Sharda; Thio, Kara; Reilly, Walter B; McDaniel, Mark A; Marsh, Elizabeth J

    2017-06-01

    Writing is often used as a tool for learning. However, empirical support for the benefits of writing-to-learn is mixed, likely because the literature conflates diverse activities (e.g., summaries, term papers) under the single umbrella of writing-to-learn. Following recent trends in the writing-to-learn literature, the authors focus on the underlying cognitive processes. They draw on the largely independent writing-to-learn and cognitive psychology learning literatures to identify important cognitive processes. The current experiment examines learning from 3 writing tasks (and 1 nonwriting control), with an emphasis on whether or not the tasks engaged retrieval. Tasks that engaged retrieval (essay writing and free recall) led to better final test performance than those that did not (note taking and highlighting). Individual differences in structure building (the ability to construct mental representations of narratives; Gernsbacher, Varner, & Faust, 1990) modified this effect; skilled structure builders benefited more from essay writing and free recall than did less skilled structure builders. Further, more essay-like responses led to better performance, implicating the importance of additional cognitive processes such as reorganization and elaboration. The results highlight how both task instructions and individual differences affect the cognitive processes involved when writing-to-learn, with consequences for the effectiveness of the learning strategy. (PsycINFO Database Record (c) 2017 APA, all rights reserved).

  19. Business process re-engineering in service operations

    International Nuclear Information System (INIS)

    McClintock, J.W.

    1995-01-01

    The concept of business process re-engineering, and how it was applied to the operations of the Consumers Gas Company were discussed. Business process re-engineering was defined as the improvement of the efficiency of the customer-service process, and the overall improvement of practices and operations. The re-engineering project was said to involve a thorough analysis of information technology, current limitations, and business operational needs, undertaken on an enterprise-wide basis. Viewed generically,a re-engineering project was said to have six major components: (1) business drivers (i.e. the articulation of the Company's strategic issues); (2) benchmark measures; (3) future state process models; (4) cost/benefit analysis; (5) a change management plan; and (6) a development plan. Business improvements expected to result from the project include reduced cost of operation, reduction of waste, and a substantially complete re-design of the business process. Management of the project involved a team approach, and help of a consultant to identify the scope of the re-design, its limitations, and future state. A life expectancy of approximately 10 years was given for the re-engineering plan, with annual benefits (in terms of cost reduction) of $4.6 million by the year 2000

  20. Final report on the public involvement process phase 1, Monitored Retrievable Storage Facility Feasibility Study

    Energy Technology Data Exchange (ETDEWEB)

    Moore, L.; Shanteau, C.

    1992-12-01

    This report summarizes the pubic involvement component of Phase 1 of the Monitored Retrievable Storage Facility (NM) Feasibility Study in San Juan County, Utah. Part of this summary includes background information on the federal effort to locate a voluntary site for temporary storage of nuclear waste, how San Juan County came to be involved, and a profile of the county. The heart of the report, however, summarizes the activities within the public involvement process, and the issues raised in those various forums. The authors have made every effort to reflect accurately and thoroughly all the concerns and suggestions expressed to us during the five month process. We hope that this report itself is a successful model of partnership with the citizens of the county -- the same kind of partnership the county is seeking to develop with its constituents. Finally, this report offers some suggestions to both county officials and residents alike. These suggestions concern how decision-making about the county's future can be done by a partnership of informed citizens and listening decision-makers. In the Appendix are materials relating to the public involvement process in San Juan County.

  1. Final report on the public involvement process phase 1, Monitored Retrievable Storage Facility Feasibility Study

    Energy Technology Data Exchange (ETDEWEB)

    Moore, L.; Shanteau, C.

    1992-12-01

    This report summarizes the pubic involvement component of Phase 1 of the Monitored Retrievable Storage Facility (NM) Feasibility Study in San Juan County, Utah. Part of this summary includes background information on the federal effort to locate a voluntary site for temporary storage of nuclear waste, how San Juan County came to be involved, and a profile of the county. The heart of the report, however, summarizes the activities within the public involvement process, and the issues raised in those various forums. The authors have made every effort to reflect accurately and thoroughly all the concerns and suggestions expressed to us during the five month process. We hope that this report itself is a successful model of partnership with the citizens of the county -- the same kind of partnership the county is seeking to develop with its constituents. Finally, this report offers some suggestions to both county officials and residents alike. These suggestions concern how decision-making about the county`s future can be done by a partnership of informed citizens and listening decision-makers. In the Appendix are materials relating to the public involvement process in San Juan County.

  2. Final report on the public involvement process phase 1, Monitored Retrievable Storage Facility Feasibility Study

    International Nuclear Information System (INIS)

    Moore, L.; Shanteau, C.

    1992-12-01

    This report summarizes the pubic involvement component of Phase 1 of the Monitored Retrievable Storage Facility (NM) Feasibility Study in San Juan County, Utah. Part of this summary includes background information on the federal effort to locate a voluntary site for temporary storage of nuclear waste, how San Juan County came to be involved, and a profile of the county. The heart of the report, however, summarizes the activities within the public involvement process, and the issues raised in those various forums. The authors have made every effort to reflect accurately and thoroughly all the concerns and suggestions expressed to us during the five month process. We hope that this report itself is a successful model of partnership with the citizens of the county -- the same kind of partnership the county is seeking to develop with its constituents. Finally, this report offers some suggestions to both county officials and residents alike. These suggestions concern how decision-making about the county's future can be done by a partnership of informed citizens and listening decision-makers. In the Appendix are materials relating to the public involvement process in San Juan County

  3. Management systems for environmental restoration projects

    International Nuclear Information System (INIS)

    Harbert, R.R.

    1990-01-01

    This paper reports that the success fo large environmental restoration projects depends on sound management systems to guide the team of organizations and individuals responsible for the project. Public concern about and scrutiny of these environmental projects increase the stakes for those involved in the management of projects. The Department of Energy (DOE) Formerly Utilized Sites Remedial Action Program (FUSRAP) uses a system approach to performing and improving the work necessary to meet FUSRAP objectives. This approach to preforming and improving the work necessary to meet FUSRAP objectives. This approach is based upon management criteria embodied in DOE cost and schedule control system and the quality assurance requirements. The project team used complementary criteria to develop a system of related parts and processes working together to accomplish the goals of the project

  4. Data processing project management in the construction of plants and power stations

    International Nuclear Information System (INIS)

    Huelsen, H.; Hayen, W.

    1987-01-01

    The requirements of project management in plant construction i.e. basic data, supervision and control became more and more detailed. These requirements can only satisfactorily be met with the help of data processing. Piping design requires up to 50% of the whole amount of engineering in design and management of plant construction. We present data processing project management system which explains the connections of single aspects. Its connections consists of: collection of basic data, plant design and installation, supervision of planning and installation, planning and calculation, collection, use, administration and approval of plan data, procurement material, construction of the model (1:25), and installation. (orig.) [de

  5. Using Process Theory for Accumulating Project Management Knowledge : A Seven-Category Model

    NARCIS (Netherlands)

    Niederman, Fred; Mueller, Benjamin; March, Salvatore T.

    2018-01-01

    Process theory has become an important type of theory for the accumulation of knowledge in a number of disciplines. Process theory focuses on sequences of activities, their duration and the intervals between them, as they lead to particular outcomes. Thus it is particularly relevant to project

  6. IV&V Project Assessment Process Validation

    Science.gov (United States)

    Driskell, Stephen

    2012-01-01

    The Space Launch System (SLS) will launch NASA's Multi-Purpose Crew Vehicle (MPCV). This launch vehicle will provide American launch capability for human exploration and travelling beyond Earth orbit. SLS is designed to be flexible for crew or cargo missions. The first test flight is scheduled for December 2017. The SLS SRR/SDR provided insight into the project development life cycle. NASA IV&V ran the standard Risk Based Assessment and Portfolio Based Risk Assessment to identify analysis tasking for the SLS program. This presentation examines the SLS System Requirements Review/System Definition Review (SRR/SDR), IV&V findings for IV&V process validation correlation to/from the selected IV&V tasking and capabilities. It also provides a reusable IEEE 1012 scorecard for programmatic completeness across the software development life cycle.

  7. In Situ Fringe Projection Profilometry for Laser Power Bed Fusion Process

    Science.gov (United States)

    Zhang, Bin

    Additive manufacturing (AM) offers an industrial solution to produce parts with complex geometries and internal structures that conventional manufacturing techniques cannot produce. However, current metal additive process, particularly the laser powder bed fusion (LPBF) process, suffers from poor surface finish and various material defects which hinder its wide applications. One way to solve this problem is by adding in situ metrology sensor onto the machine chamber. Matured manufacturing processes are tightly monitored and controlled, and instrumentation advances are needed to realize this same advantage for metal additive process. This encourages us to develop an in situ fringe projection system for the LPBF process. The development of such a system and the measurement capability are demonstrated in this dissertation. We show that this system can measure various powder bed signatures including powder layer variations, the average height drop between fused metal and unfused powder, and the height variations on the fused surfaces. The ability to measure textured surface is also evaluated through the instrument transfer function (ITF). We analyze the mathematical model of the proposed fringe projection system, and prove the linearity of the system through simulations. A practical ITF measurement technique using a stepped surface is also demonstrated. The measurement results are compared with theoretical predictions generated through the ITF simulations.

  8. GENERAL ALGORITHMIC SCHEMA OF THE PROCESS OF THE CHILL AUXILIARIES PROJECTION

    Directory of Open Access Journals (Sweden)

    A. N. Chichko

    2006-01-01

    Full Text Available The general algorithmic diagram of systematization of the existing approaches to the process of projection is offered and the foundation of computer system of the chill mold arming construction is laid.

  9. Selecting a Sustainable Disinfection Technique for Wastewater Reuse Projects

    Directory of Open Access Journals (Sweden)

    Jorge Curiel-Esparza

    2014-09-01

    Full Text Available This paper presents an application of the Analytical Hierarchy Process (AHP by integrating a Delphi process for selecting the best sustainable disinfection technique for wastewater reuse projects. The proposed methodology provides project managers a tool to evaluate problems with multiple criteria and multiple alternatives which involve non-commeasurable decision criteria, with expert opinions playing a major role in the selection of these treatment technologies. Five disinfection techniques for wastewater reuse have been evaluated for each of the nine criteria weighted according to the opinions of consulted experts. Finally, the VIKOR method has been applied to determine a compromise solution, and to establish the stability of the results. Therefore, the expert system proposed to select the optimal disinfection alternative is a hybrid method combining the AHP with the Delphi method and the VIKOR technique, which is shown to be appropriate in realistic scenarios where multiple stakeholders are involved in the selection of a sustainable disinfection technique for wastewater reuse projects.

  10. Navigating Evidence-Based Practice Projects: The Faculty Role.

    Science.gov (United States)

    Moch, Susan D; Quinn-Lee, Lisa; Gallegos, Cara; Sortedahl, Charlotte K

    : An innovative way to facilitate evidence-based practice (EBP) learning and to get evidence into practice is through academic-clinical agency projects involving faculty, undergraduate students, and agency staff. The central role of the faculty is key to successful academic-clinical agency partnerships. Faculty navigate the often difficult process of focusing students and engaging busy staff through initiating, maintaining, and evaluating projects. Students learn valuable EBP skills, staff become engaged in EBP, and the projects are rated highly by agency administrators.

  11. Chernobyl post-accident management: the ETHOS project.

    Science.gov (United States)

    Dubreuil, G H; Lochard, J; Girard, P; Guyonnet, J F; Le Cardinal, G; Lepicard, S; Livolsi, P; Monroy, M; Ollagnon, H; Pena-Vega, A; Pupin, V; Rigby, J; Rolevitch, I; Schneider, T

    1999-10-01

    ETHOS is a pilot research project supported by the radiation protection research program of the European Commission (DG XII). The project provides an alternative approach to the rehabilitation of living conditions in the contaminated territories of the CIS in the post-accident context of Chernobyl. Initiated at the beginning of 1996, this 3-y project is currently being implemented in the Republic of Belarus. The ETHOS project involves an interdisciplinary team of European researchers from the following institutions: the Centre d'etude sur l'Evaluation de la Protection dans le domaine Nucleaire CEPN (radiological protection, economics), the Institute National d'Agronomie de Paris-Grignon INAPG (agronomy, nature & life management), the Compiegne University of Technology (technological and industrial safety, social trust), and the Mutadis Research Group (sociology, social risk management), which is in charge of the scientific co-ordination of the project. The Belarussian partners in the ETHOS project include the Ministry of Emergencies of Belarus as well as the various local authorities involved with the implementation site. The ETHOS project relies on a strong involvement of the local population in the rehabilitation process. Its main goal is to create conditions for the inhabitants of the contaminated territories to reconstruct their overall quality of life. This reconstruction deals with all the day-to-day aspects that have been affected or threatened by the contamination. The project aims at creating a dynamic process whereby acceptable living conditions can be rebuilt. Radiological security is developed in the ETHOS project as part of a general improvement in the quality of life. The approach does not dissociate the social and the technical dimensions of post-accident management. This is so as to avoid radiological risk assessment and management being reduced purely to a problem for scientific experts, from which local people are excluded, and to take into

  12. Stakeholder Involvement in Brazil. Appendix IX.4

    International Nuclear Information System (INIS)

    2016-01-01

    In response to public concerns about mining projects, mechanisms for stakeholder involvement in decisions concerning the licensing process of mining operations have been established. The most popular ones are the public hearings. The environmental regulatory body, Brazilian Institute of the Environment and Renewable Natural Resources (Instituto Brasileiro do Meio Ambiente e dos Recursos Naturais Renováveis, IBAMA), makes use of these events to inform the local community about impacts on the economic, physical and social issues caused by the operation of a mining project. However, by legislation, a uranium mining and processing plant is not regulated solely by the environmental regulator at the state and federal level. The Brazilian National Nuclear Energy Commission (Comissão Nacional de Energia Nuclear, CNEN) plays the key role as the nuclear regulatory body, and in many situations, it is perceived by local communities, where uranium mining projects are developed, as the main responsible party responding to regulatory issues regarding this type of operation. The situation gets even more complicated when it is seen that uranium mining and processing operations are state owned activities and the independency of the regulatory body (mainly the nuclear regulatory authority) is questioned, or at least put under scrutiny. It is not common for an ‘independent’ organization to be requested to provide regulatory oversight and this undermines the trust the communities may have on the regulatory process carried on regarding that specific operation

  13. Vitrification process equipment design for the West Valley Demonstration Project

    International Nuclear Information System (INIS)

    Chapman, C.C.; Drosjack, W.P.

    1988-10-01

    The vitrification process and equipment design is nearing completion for the West Valley Project. This report provides the basis and current status for the design of the major vessels and equipment within the West Valley Vitrification Plant. A review of the function and key design features of the equipment is also provided. The major subsystems described include the feed preparation and delivery systems, the melter, the canister handling systems, and the process off-gas system. 11 refs., 33 figs., 4 tabs

  14. Knowledge Creation Through Development Projects

    DEFF Research Database (Denmark)

    Laursen, Erik

    2010-01-01

    The focus of the paper is set on efforts to produce and manage organizational learning and development through engagement in organizational development projects, involving the implementation of new methods, new technologies and new ways of organizing the work processes. The issues discussed...... study of four organizational development projects (covering the organizations as a whole) held by four Danish High Schools (“gymnasium”). The study included questionnaires as well as interviews with the management and staff, plus a survey of selected written materials and documents. The purpose...... of the paper is to describe the activities, actually organized by the projects., as well as the various ways in which different groupings among the staff and the management are relating to the project. A special focus is set on the different perspectives on the projects established by the staff...

  15. D6.4 Implementation: Project Knowledge Management

    DEFF Research Database (Denmark)

    Dolog, Peter; Durao, Frederico; Jahn, Karsten

    2009-01-01

    This report presents the prototype for the project knowledge management in Logica. We describe the related theories and our approach, the ‘circle of knowledge’. According to our analysis it results in the data-based import or update process between two specialized applications, one for project...... management and one for knowledge sharing. We describe the applications involved and the features used. The main component here is a templating mechanism in the KiWi system....

  16. A process for selection and training of super-users for ERP implementation projects

    DEFF Research Database (Denmark)

    Danielsen, Peter; Sandfeld Hansen, Kenneth; Helt, Mads

    2017-01-01

    The concept of super-users as a means to facilitate ERP implementation projects has recently taken a foothold in practice, but is still largely overlooked in research. In particular, little is known about the selection and training processes required to successfully develop skilled super-users in......The concept of super-users as a means to facilitate ERP implementation projects has recently taken a foothold in practice, but is still largely overlooked in research. In particular, little is known about the selection and training processes required to successfully develop skilled super...

  17. Decision-making process in investment projects

    OpenAIRE

    Moutinho, Nuno

    2011-01-01

    We present projects evaluation approaches in what decision should be based. We try to understand what we have to take into account in a project analysis, knowing that we have to consider much unmeasured aspects, like non non-financial areas. We verify how all aspects are used and analysed in the project appraisal. We also desire to understand if companies have adequate tools and methods to correctly analyse and to take decisions in a project evaluation. In this study we identify several as...

  18. A review of risk management process in construction projects of developing countries

    Science.gov (United States)

    Bahamid, R. A.; Doh, S. I.

    2017-11-01

    In the construction industry, risk management concept is a less popular technique. There are three main stages in the systematic approach to risk management in construction industry. These stages include: a) risk response; b) risk analysis and evaluation; and c) risk identification. The high risk related to construction business affects each of its participants; while operational analysis and management of construction related risks remain an enormous task to practitioners of the industry. This paper tends towards reviewing the existing literature on construction project risk managements in developing countries specifically on risk management process. The literature lacks ample risk management process approach capable of capturing risk impact on diverse project objectives. This literature review aims at discovering the frequently used techniques in risk identification and analysis. It also attempts to identify response to clarifying the different classifications of risk sources in the existing literature of developing countries, and to identify the future research directions on project risks in the area of construction in developing countries.

  19. Project management best practices: forging win-win partnerships and mitigating power project risk

    International Nuclear Information System (INIS)

    Trowsdale, R.

    2006-01-01

    This paper discusses aspects of project management to mitigate power project risk. end-to-end project development involves development phase, permitting phase, implementation phase, and operational phase. Each phase involves a number of different elements. In renewable energy project good management requires maintaining project discipline and schedule throughout all phases. Project success requires commercial competitiveness, fuel availability, power sales contracts, stake holder support, permitting, effective execution, construction and good technical performance

  20. Radiological features of endocrine orbitopathy involving lacrimal gland

    Directory of Open Access Journals (Sweden)

    V. G. Likhvantseva

    2014-07-01

    Full Text Available According to orbit computer tomography, lacrimal gland is involved in autoimmune process in 26.8% of patients with Graves’ orbitopathy. A short orbit is a predisposing factor of the lacrimal gland (LG involvement in the autoimmune process. In addition to increasing of the size of the lacrimal gland, formed thickening of the optic nerve in 1 cm from the eye posterior pole (in 60% of cases, the increase in x-ray density of orbital portions of optic nerve, proved «shortening» of length in axial projection with reliable reduc- tion of length to width ratio (with increase in width at the same time up to 5.8±0.2 are roentgenological features of this сlinical form. Change of spatial topography in orbit with reduction of the conversion rate was associated with increased rate of optic neuropathydevelopment.

  1. Involvement of microRNAs in physiological and pathological processes in the lung

    Directory of Open Access Journals (Sweden)

    Kriegova Eva

    2010-11-01

    Full Text Available Abstract To date, at least 900 different microRNA (miRNA genes have been discovered in the human genome. These short, single-stranded RNA molecules originate from larger precursor molecules that fold to produce hairpin structures, which are subsequently processed by ribonucleases Drosha/Pasha and Dicer to form mature miRNAs. MiRNAs play role in the posttranscriptional regulation of about one third of human genes, mainly via degradation of target mRNAs. Whereas the target mRNAs are often involved in the regulation of diverse physiological processes ranging from developmental timing to apoptosis, miRNAs have a strong potential to regulate fundamental biological processes also in the lung compartment. However, the knowledge of the role of miRNAs in physiological and pathological conditions in the lung is still limited. This review, therefore, summarizes current knowledge of the mechanism, function of miRNAs and their contribution to lung development and homeostasis. Besides the involvement of miRNAs in pulmonary physiological conditions, there is evidence that abnormal miRNA expression may lead to pathological processes and development of various pulmonary diseases. Next, the review describes current state-of-art on the miRNA expression profiles in smoking-related diseases including lung cancerogenesis, in immune system mediated pulmonary diseases and fibrotic processes in the lung. From the current research it is evident that miRNAs may play role in the posttranscriptional regulation of key genes in human pulmonary diseases. Further studies are, therefore, necessary to explore miRNA expression profiles and their association with target mRNAs in human pulmonary diseases.

  2. Patient Involvement in Geriatric Care – Results and Experiences from a Mixed Models Design Study within Project INTEGRATE

    Directory of Open Access Journals (Sweden)

    Joern Kiselev

    2018-02-01

    Full Text Available Introduction: Patient involvement is a core component of an integrated care approach. While the benefits and prerequisites of patient involvement have been described in general and additionally for some target populations, little is known about the views and experiences of older people regarding this matter. Methods: A study with a mixed-methods design was conducted to gain a better understanding about patient involvement in geriatric care. A questionnaire on shared decision-making was administered within a group of older adults in Germany. Additionally, 7 focus groups with health professionals and geriatric patients in Germany and Estonia were held to deepen the insight of the questionnaire and discussing experiences and barriers of patient involvement. Results: Older people without an actual medical problem expressed a significantly higher desire to participate in shared decisions than those requiring actual medical care. No significant differences could be found for the desire to be informed as part of the care process. No correlation between patients’ desire and experiences on shared decision-making could be observed. In the focus groups, patients demanded a comprehensive and understandable information and education process while the health professionals’ view was very task-specific. This conflict led to a loss of trust by the patients. Conclusions: There is a gap between patients’ and health professionals’ views on patient involvement in older people. The involvement process should therefore be comprehensive and should take into account different levels of health literacy.

  3. Space Object and Light Attribute Rendering (SOLAR) Projection System

    Science.gov (United States)

    2017-05-08

    depicting the proposed SOLAR projection system. The installation process is shown in Fig. 3. SOLAR system comprises of a dome that houses Digitairum’s...imaging process. A fiberglass dome system was erected to make the SOLAR system a self contained facility. Calibration process was carried out to register...Separate software solutions were implemented to model the light transport processes involved in the imaging process. A fiberglass dome system was erected to

  4. Delivering Software Process-Specific Project Courses in Tertiary Education Environment: Challenges and Solution

    Science.gov (United States)

    Rong, Guoping; Shao, Dong

    2012-01-01

    The importance of delivering software process courses to software engineering students has been more and more recognized in China in recent years. However, students usually cannot fully appreciate the value of software process courses by only learning methodology and principle in the classroom. Therefore, a process-specific project course was…

  5. Overhead remote handling systems for the process facility modifications project

    International Nuclear Information System (INIS)

    Wiesener, R.W.; Grover, D.L.

    1987-01-01

    Each of the cells in the process facility modifications (PFM) project complex is provided with a variety of general purpose remote handling equipment including bridge cranes, monorail hoist, bridge-mounted electromechanical manipulator (EMM) and an overhead robot used for high efficiency particulate air (HEPA) filter changeout. This equipment supplements master-slave manipulators (MSMs) located throughout the complex to provide an overall remote handling system capability. The overhead handling equipment is used for fuel and waste material handling operations throughout the process cells. The system also provides the capability for remote replacement of all in-cell process equipment which may fail or be replaced for upgrading during the lifetime of the facility

  6. The impact of stakeholder involvement in hospital policy decision-making: a study of the hospital's business processes.

    Science.gov (United States)

    Malfait, Simon; Van Hecke, Ann; Hellings, Johan; De Bodt, Griet; Eeckloo, Kristof

    2017-02-01

    In many health care systems, strategies are currently deployed to engage patients and other stakeholders in decisions affecting hospital services. In this paper, a model for stakeholder involvement is presented and evaluated in three Flemish hospitals. In the model, a stakeholder committee advises the hospital's board of directors on themes of strategic importance. To study the internal hospital's decision processes in order to identify the impact of a stakeholder involvement committee on strategic themes in the hospital decision processes. A retrospective analysis of the decision processes was conducted in three hospitals that implemented a stakeholder committee. The analysis consisted of process and outcome evaluation. Fifteen themes were discussed in the stakeholder committees, whereof 11 resulted in a considerable change. None of these were on a strategic level. The theoretical model was not applied as initially developed, but was altered by each hospital. Consequentially, the decision processes differed between the hospitals. Despite alternation of the model, the stakeholder committee showed a meaningful impact in all hospitals on the operational level. As a result of the differences in decision processes, three factors could be identified as facilitators for success: (1) a close interaction with the board of executives, (2) the inclusion of themes with a more practical and patient-oriented nature, and (3) the elaboration of decisions on lower echelons of the organization. To effectively influence the organization's public accountability, hospitals should involve stakeholders in the decision-making process of the organization. The model of a stakeholder committee was not applied as initially developed and did not affect the strategic decision-making processes in the involved hospitals. Results show only impact at the operational level in the participating hospitals. More research is needed connecting stakeholder involvement with hospital governance.

  7. DECOVALEX III PROJECT. Thermal-Hydro-Mechanical Coupled Processes in Safety Assessments. Report of Task 4

    International Nuclear Information System (INIS)

    Andersson, Johan

    2005-02-01

    A part (Task 4) of the International DECOVALEX III project on coupled thermo-hydro-mechanical (T-H-M) processes focuses on T-H-M modelling applications in safety and performance assessment of deep geological nuclear waste repositories. A previous phase, DECOVALEX II, saw a need to improve such modelling. In order to address this need Task 4 of DECOVALEX III has: Analysed two major T-H-M experiments (Task 1 and Task 2) and three different Bench Mark Tests (Task 3) set-up to explore the significance of T-H-M in some potentially important safety assessment applications. Compiled and evaluated the use of T-H-M modelling in safety assessments at the time of the year 2000. Organised a forum a forum of interchange between PA-analysts and THM modelers at each DECOVALEX III workshop. Based on this information the current report discusses the findings and strives for reaching recommendations as regards good practices in addressing coupled T-H-M issues in safety assessments. The full development of T-H-M modelling is still at an early stage and it is not evident whether current codes provide the information that is required. However, although the geosphere is a system of fully coupled processes, this does not directly imply that all existing coupled mechanisms must be represented numerically. Modelling is conducted for specific purposes and the required confidence level should be considered. It is necessary to match the confidence level with the modelling objective. Coupled THM modelling has to incorporate uncertainties. These uncertainties mainly concern uncertainties in the conceptual model and uncertainty in data. Assessing data uncertainty is important when judging the need to model coupled processes. Often data uncertainty is more significant than the coupled effects. The emphasis on the need for THM modelling differs among disciplines. For geological radioactive waste disposal in crystalline and other similar hard rock formations DECOVALEX III shows it is essential to

  8. DECOVALEX III PROJECT. Thermal-Hydro-Mechanical Coupled Processes in Safety Assessments. Report of Task 4

    Energy Technology Data Exchange (ETDEWEB)

    Andersson, Johan [JA Streamflow AB, Aelvsjoe (Sweden)

    2005-02-15

    A part (Task 4) of the International DECOVALEX III project on coupled thermo-hydro-mechanical (T-H-M) processes focuses on T-H-M modelling applications in safety and performance assessment of deep geological nuclear waste repositories. A previous phase, DECOVALEX II, saw a need to improve such modelling. In order to address this need Task 4 of DECOVALEX III has: Analysed two major T-H-M experiments (Task 1 and Task 2) and three different Bench Mark Tests (Task 3) set-up to explore the significance of T-H-M in some potentially important safety assessment applications. Compiled and evaluated the use of T-H-M modelling in safety assessments at the time of the year 2000. Organised a forum a forum of interchange between PA-analysts and THM modelers at each DECOVALEX III workshop. Based on this information the current report discusses the findings and strives for reaching recommendations as regards good practices in addressing coupled T-H-M issues in safety assessments. The full development of T-H-M modelling is still at an early stage and it is not evident whether current codes provide the information that is required. However, although the geosphere is a system of fully coupled processes, this does not directly imply that all existing coupled mechanisms must be represented numerically. Modelling is conducted for specific purposes and the required confidence level should be considered. It is necessary to match the confidence level with the modelling objective. Coupled THM modelling has to incorporate uncertainties. These uncertainties mainly concern uncertainties in the conceptual model and uncertainty in data. Assessing data uncertainty is important when judging the need to model coupled processes. Often data uncertainty is more significant than the coupled effects. The emphasis on the need for THM modelling differs among disciplines. For geological radioactive waste disposal in crystalline and other similar hard rock formations DECOVALEX III shows it is essential to

  9. Learning to work together - lessons from a reflective analysis of a research project on public involvement.

    Science.gov (United States)

    Howe, A; Mathie, E; Munday, D; Cowe, M; Goodman, C; Keenan, J; Kendall, S; Poland, F; Staniszewska, S; Wilson, P

    2017-01-01

    Patient and public involvement (PPI) in research is very important, and funders and the NHS all expect this to happen. What this means in practice, and how to make it really successful, is therefore an important research question. This article analyses the experience of a research team using PPI, and makes recommendations on strengthening PPI in research. There were different PPI roles in our study - some people were part of the research team: some were on the advisory group; and there were patient groups who gave specific feedback on how to make research work better for their needs. We used minutes, other written documents, and structured individual and group reflections to learn from our own experiences over time. The main findings were:- for researchers and those in a PPI role to work in partnership, project structures must allow flexibility and responsiveness to different people's ideas and needs; a named link person can ensure support; PPI representatives need to feel fully included in the research; make clear what is expected for all roles; and ensure enough time and funding to allow meaningful involvement. Some roles brought more demands but also more rewards than others - highlighting that it is important that people giving up their time to help with research experience gains from doing so. Those contributing to PPI on a regular basis may want to learn new skills, rather than always doing the same things. Researchers and the public need to find ways to develop roles in PPI over time. We also found that, even for a team with expertise in PPI, there was a need both for understanding of different ways to contribute, and an evolving 'normalisation' of new ways of working together over time, which both enriched the process and the outputs. Background Patient and public involvement (PPI) is now an expectation of research funders, in the UK, but there is relatively little published literature on what this means in practice - nor is there much evaluative research

  10. Developing financeable projects in Central Europe

    Energy Technology Data Exchange (ETDEWEB)

    Chelberg, R.; Prerad, V. [POWER International, Josefov (Czechoslovakia)

    1995-12-01

    POWER`s engineering and development experience in the Czech Republic creating financeable projects within the power generation industry will be presented. POWER has been involved in the Czech Republic`s privatization process, environmental legislation as well as formation of the regulatory environment. Strategic methods for accomplishing the development of financeable projects often include ownership and financial restructuring of the projects. This is done by utilizing internal cash flows, external debt and equity placement (provided by international financial institutions) by restructuring the facility`s contractual relationships and operations (providing as least cost solution to engineering) and possibly using existing governmental guarantees. In order to make any recommendations on how to come into compliance with the country`s environmental legislation, it is necessary to begin with an analysis of the existing facility. This involves preparation of technical and economic feasibility study, evaluation of technology and preliminary engineering solutions. It further involves restructuring of power sales agreements, heat sales agreements, and fuel supply agreements. The goal is to provide suitable security for the equity and debt financing participants by mitigating risk and creating a single purpose business unit with predictable life and economics.

  11. Effect of project work on secondary school students science process ...

    African Journals Online (AJOL)

    The study investigated the effect of students' project work on secondary school science process skills acquisition in Biology. The study was carried out in Owerri North Local Government Area of Imo State. Three research questions guided the study and three null hypotheses were postulated and tested at 0.05 level of ...

  12. Promoting Perceived Benefits of Group Projects: The Role of Instructor Contributions and Intragroup Processes

    Science.gov (United States)

    Bailey, Sarah; Barber, Larissa K.; Ferguson, Amanda J.

    2015-01-01

    Group projects are often used in psychology courses to prepare students for future collaborative work. However, psychology alumni report that their education did not adequately prepare them for collaborative work. To better understand these perceptions, this study examined how instructor contributions (involvement and evaluation techniques)…

  13. Promoting the inclusion of Afghan women and men in research: reflections from research and community partners involved in implementing a 'proof of concept' project.

    Science.gov (United States)

    Riggs, Elisha; Yelland, Jane; Szwarc, Josef; Casey, Sue; Chesters, Donna; Duell-Piening, Philippa; Wahidi, Sayed; Fouladi, Fatema; Brown, Stephanie

    2015-01-31

    With mounting evidence that poor maternal and child health outcomes are related to the social determinants of health, researchers need to engage with vulnerable and isolated communities to gather the evidence that is essential to determine appropriate solutions. Conventional research methods may not ensure the degree and quality of participation that is necessary for meaningful study findings. Participatory methods provide reciprocal opportunities for often excluded communities to both take part in, and guide the conduct of research. The Having a baby in a new country research project was undertaken to provide evidence about how women and men of refugee background experience health services at the time of having a baby. This two year, multifaceted proof of concept study comprised: 1) an organisational partnership to oversee the project; 2) a community engagement framework including: female and male Afghan community researchers, community and sector stakeholder advisory groups and community consultation and engagement. Inclusive research strategies that address power imbalances in research, and diversity of and within communities, are necessary to obtain the evidence required to address health inequalities in vulnerable populations. Such an approach involves mindfully adapting research processes to ensure that studies have regard for the advice of community members about the issues that affect them. Researchers have much to gain by committing time and resources to engaging communities in reciprocal ways in research processes.

  14. Interdisciplinary Collaboration: Librarian Involvement in Grant Projects

    Science.gov (United States)

    Brandenburg, Marci D.; Cordell, Sigrid Anderson; Joque, Justin; MacEachern, Mark P.; Song, Jean

    2017-01-01

    Librarians are excellent research collaborators, although librarian participation is not usually considered, thereby making access to research funds difficult. The University of Michigan Library became involved in the university's novel funding program, MCubed, which supported innovative interdisciplinary research on campus, primarily by funding…

  15. Technological Innovation Projects: Proposal For an Integrative Model Between Project Management and Knowledge Management in a Customer-Supplier Perspective

    Directory of Open Access Journals (Sweden)

    Edval da Silva Tavares

    2014-10-01

    Full Text Available In face of strong competition, companies in Brazil have increased their financial investments in automation, offering new products and services and reducing operating costs. These companies are focusing their efforts on core competencies and, therefore, they often lack the internal expertise to implement new projects, especially those that bring technological innovation. For this reason, we use the processes of outsourcing or subcontracting to help implement such projects. The unit of analysis in this study is the project and the object of the study to analyze the process of knowledge transfer from a provider to a customer during the duration of the project, which involves new technologies. The main motivation of this work is to address the acquisition and retention of new knowledge related to projects designed for business customers. We have developed a study of three cases of multiple financial firms that buy new technologies and two suppliers of information technology. As a practical result, a management model of knowledge transfer and retention of knowledge in client companies is proposed and incorporated into project management.

  16. MANAGEMENT OF A COMPANY’S ECONOMIC SUSTAINABILITY IN THE PROCESS OF INNOVATIVE PROJECTS IMPLEMENTATION

    Directory of Open Access Journals (Sweden)

    Juliana M. Sulejmanova

    2013-01-01

    Full Text Available The article is devoted to management of a company’s sustainability in the process of innovative projects implementation. The author suggests using dynamic index named aggregated index of a company’s economic stability. Criteria of choosing innovative projects to be implemented are worked out. These criteria add traditional estimation and take into account changing company’s economic stability at every stage of project lifecycle.

  17. Public Involvement in Repository Site Selection for Nuclear Waste: Towards a more Dynamic View in Decision-Making Processes

    Energy Technology Data Exchange (ETDEWEB)

    Kruetli, Pius; Stauffacher, Michael; Flueeler, Thomas; Scholz, Roland W. [ETH Zuerich (Switzerland). lnst. for Human-Environment Systems (HES)

    2006-09-15

    This paper discusses possibilities of public involvement in radioactive waste management. A general overview of the radioactive waste issue is presented referring to a proposed model of the respective decision-making process. Based on the well known participation ladder by Arnstein, we differentiate various intensities of public involvement. A matrix with public involvement and the decision-making process is introduced and three prototypical patterns are discussed. We conclude that time frame, the level of public involvement and the mission have to be considered as well as techniques and the overarching context - all in all, a systematic and dynamic approach for public involvement is needed.

  18. Public Involvement in Repository Site Selection for Nuclear Waste: Towards a more Dynamic View in Decision-Making Processes

    International Nuclear Information System (INIS)

    Kruetli, Pius; Stauffacher, Michael; Flueeler, Thomas; Scholz, Roland W.

    2006-01-01

    This paper discusses possibilities of public involvement in radioactive waste management. A general overview of the radioactive waste issue is presented referring to a proposed model of the respective decision-making process. Based on the well known participation ladder by Arnstein, we differentiate various intensities of public involvement. A matrix with public involvement and the decision-making process is introduced and three prototypical patterns are discussed. We conclude that time frame, the level of public involvement and the mission have to be considered as well as techniques and the overarching context - all in all, a systematic and dynamic approach for public involvement is needed

  19. Cochlear Implant: the complexity involved in the decision making process by the family1

    Science.gov (United States)

    Vieira, Sheila de Souza; Bevilacqua, Maria Cecília; Ferreira, Noeli Marchioro Liston Andrade; Dupas, Giselle

    2014-01-01

    Objective to understand the meanings the family attributes to the phases of the decision-making process on a cochlear implant for their child. Method qualitative research, using Symbolic Interactionism and Grounded Theory as the theoretical and methodological frameworks, respectively. Data collection instrument: semistructured interview. Nine families participated in the study (32 participants). Results knowledge deficit, difficulties to contextualize benefits and risks and fear are some factors that make this process difficult. Experiences deriving from interactions with health professionals, other cochlear implant users and their relatives strengthen decision making in favor of the implant. Conclusion deciding on whether or not to have the implant involves a complex process, in which the family needs to weigh gains and losses, experience feelings of accountability and guilt, besides overcoming the risk aversion. Hence, this demands cautious preparation and knowledge from the professionals involved in this intervention. PMID:25029052

  20. Waste Management Project Contingency Analysis

    International Nuclear Information System (INIS)

    Edward L. Parsons, Jr.

    1999-01-01

    The purpose of this report is to provide the office of Waste Management (WM) with recommended contingency calculation procedures for typical WM projects. Typical projects were defined as conventional construction-type activities that use innovative elements when necessary to meet the project objectives. Projects involve treatment, storage, and disposal of low level, mixed low level, hazardous, transuranic, and high level waste. Cost contingencies are an essential part of Total Cost Management. A contingency is an amount added to a cost estimate to compensate for unexpected expenses resulting from incomplete design, unforeseen and unpredictable conditions, or uncertainties in the project scope (DOE 1994, AACE 1998). Contingency allowances are expressed as percentages of estimated cost and improve cost estimates by accounting for uncertainties. The contingency allowance is large at the beginning of a project because there are more uncertainties, but as a project develops, the allowance shrinks to adjust for costs already incurred. Ideally, the total estimated cost remains the same throughout a project. Project contingency reflects the degree of uncertainty caused by lack of project definition, and process contingency reflects the degree of uncertainty caused by use of new technology. Different cost estimation methods were reviewed and compared with respect to terminology, accuracy, and Cost Guide standards. The Association for the Advancement of Cost Engineering (AACE) methods for cost estimation were selected to represent best industry practice. AACE methodology for contingency analysis can be readily applied to WM Projects, accounts for uncertainties associated with different stages of a project, and considers both project and process contingencies and the stage of technical readiness. As recommended, AACE contingency allowances taper off linearly as a project nears completion

  1. Defining stakeholder involvement in participatory design processes

    NARCIS (Netherlands)

    Vink, P.; Imada, A.S.; Zink, K.J.

    2008-01-01

    A participatory approach could be used to implement work place or organizational improvements. However, the question is which participants should be involved and how. In this paper the theoretical involvement in different steps of a linear stepwise approach is described and compared with the latest

  2. Forest Soil Bacteria: Diversity, Involvement in Ecosystem Processes, and Response to Global Change

    Czech Academy of Sciences Publication Activity Database

    Lladó, Salvador; López-Mondéjar, Rubén; Baldrian, Petr

    2017-01-01

    Roč. 81, č. 2 (2017), s. 1-27, č. článku e00063. ISSN 1092-2172 R&D Projects: GA ČR(CZ) GP14-09040P; GA MŠk(CZ) LD15086 Institutional support: RVO:61388971 Keywords : bacteria * decomposition * ecosystem processes Subject RIV: EE - Microbiology, Virology OBOR OECD: Microbiology Impact factor: 14.533, year: 2016

  3. Using Focused Laboratory Management and Quality Improvement Projects to Enhance Resident Training and Foster Scholarship

    Science.gov (United States)

    Ford, Bradley A.; Klutts, J. Stacey; Jensen, Chris S.; Briggs, Angela S.; Robinson, Robert A.; Bruch, Leslie A.; Karandikar, Nitin J.

    2017-01-01

    Training in patient safety, quality, and management is widely recognized as an important element of graduate medical education. These concepts have been intertwined in pathology graduate medical education for many years, although training programs face challenges in creating explicit learning opportunities in these fields. Tangibly involving pathology residents in management and quality improvement projects has the potential to teach and reinforce key concepts and further fulfill Accreditation Council for Graduate Medical Education goals for pursuing projects related to patient safety and quality improvement. In this report, we present our experience at a pathology residency program (University of Iowa) in engaging pathology residents in projects related to practical issues of laboratory management, process improvement, and informatics. In this program, at least 1 management/quality improvement project, typically performed during a clinical chemistry/management rotation, was required and ideally resulted in a journal publication. The residency program also initiated a monthly management/informatics series for pathology externs, residents, and fellows that covers a wide range of topics. Since 2010, all pathology residents at the University of Iowa have completed at least 1 management/quality improvement project. Many of the projects involved aspects of laboratory test utilization, with some projects focused on other areas such as human resources, informatics, or process improvement. Since 2012, 31 peer-reviewed journal articles involving effort from 26 residents have been published. Multiple projects resulted in changes in ongoing practice, particularly within the hospital electronic health record. Focused management/quality improvement projects involving pathology residents can result in both meaningful quality improvement and scholarly output. PMID:28913416

  4. Using Focused Laboratory Management and Quality Improvement Projects to Enhance Resident Training and Foster Scholarship.

    Science.gov (United States)

    Krasowski, Matthew D; Ford, Bradley A; Klutts, J Stacey; Jensen, Chris S; Briggs, Angela S; Robinson, Robert A; Bruch, Leslie A; Karandikar, Nitin J

    2017-01-01

    Training in patient safety, quality, and management is widely recognized as an important element of graduate medical education. These concepts have been intertwined in pathology graduate medical education for many years, although training programs face challenges in creating explicit learning opportunities in these fields. Tangibly involving pathology residents in management and quality improvement projects has the potential to teach and reinforce key concepts and further fulfill Accreditation Council for Graduate Medical Education goals for pursuing projects related to patient safety and quality improvement. In this report, we present our experience at a pathology residency program (University of Iowa) in engaging pathology residents in projects related to practical issues of laboratory management, process improvement, and informatics. In this program, at least 1 management/quality improvement project, typically performed during a clinical chemistry/management rotation, was required and ideally resulted in a journal publication. The residency program also initiated a monthly management/informatics series for pathology externs, residents, and fellows that covers a wide range of topics. Since 2010, all pathology residents at the University of Iowa have completed at least 1 management/quality improvement project. Many of the projects involved aspects of laboratory test utilization, with some projects focused on other areas such as human resources, informatics, or process improvement. Since 2012, 31 peer-reviewed journal articles involving effort from 26 residents have been published. Multiple projects resulted in changes in ongoing practice, particularly within the hospital electronic health record. Focused management/quality improvement projects involving pathology residents can result in both meaningful quality improvement and scholarly output.

  5. Patterns in professional growth of science teachers involved in a team-based PD project

    DEFF Research Database (Denmark)

    Nielsen, Birgitte Lund

    and learning and subsequent discussion of this material. Repeated interviews were analyzed using an adapted version of the interconnected model of teachers’ professional growth. The results show various ways of experimenting with new approaches to be important for three of the teachers while a novice teacher...... the participants refer to. Conclusion is that there are professional growth patterns, especially a pattern involving experimenting, which have a forward-pointing potential to be used to inform school based PD. The results implicate that the same PD project can frame experimenting into practice in various tempi...... and with differentiated facilitation aligned to the individual teacher’s current needs and that external support of science resource teachers can be an integrated part of school based PD....

  6. Sulfomethylated lignosulfonates as additives in oil recovery processes involving chemical recovery agents

    Energy Technology Data Exchange (ETDEWEB)

    Kalfoglou, G.

    1979-10-30

    A process for producing petroleum from subterranean formations is disclosed wherein production from the formation is obtained by driving a fluid from an injection well to a production well. The process involves injecting via the injection well into the formation an aqueous solution of sulfomethylated lignosulfonate salt as a sacrificial agent to inhibit the deposition of surfactant and/or polymer on the reservoir matrix. The process may best be carried out by injecting the sulfomethylated lignosulfonates into the formation through the injection well mixed with either a polymer, a surfactant solution and/or a micellar dispersion. This mixture would then be followed by a drive fluid such as water to push the chemicals to the production well.

  7. Sulfomethylated lignosulfonates as additives in oil recovery processes involving chemical recovery agents

    Energy Technology Data Exchange (ETDEWEB)

    Kalfoglou, G.

    1981-05-26

    A process for producing petroleum from subterranean formations is disclosed wherein production from the formation is obtained by driving a fluid from an injection well to a production well. The process involves injecting via the injection well into the formation an aqueous solution of sulfomethylated lignosulfonate salt as a sacrificial agent to inhibit the deposition of surfactant and/or polymer on the reservoir matrix. The process may best be carried out by injecting the sulfomethylated lignosulfonates into the formation through the injection well mixed with either a polymer, a surfactant solution and/or a micellar dispersion. This mixture would then be followed by a drive fluid such as water to push the chemicals to the production well.

  8. Involving Customer Relations in Contextual Design

    DEFF Research Database (Denmark)

    Simonsen, Jesper

    1996-01-01

    This paper presents a case study in the form of a contextual design project, the aim of which was to design a system for a particular organization. The starting point in the case was a need in the organization for a specific system. The case involved an analysis of the organizations customer...... point of the design project, how the project was conducted, and which results it ended up with. This is followed by a discussion of the effects of, and lessons learned by, involving customer relations in contextual design....

  9. Hanford Waste Vitrification Plant - the project and process systems

    International Nuclear Information System (INIS)

    Swenson, L.D.; Miller, W.C.; Smith, R.A.

    1990-01-01

    The Hanford Waste Vitrification Plant (HWVP) project is scheduled to start construction on the Hanford reservation in southeastern Washington State in 1991. The project will immobilize the liquid high-level defense waste stored there. The HWVP represents the third phase of the U.S. Department of Energy (DOE) activities that are focused on the permanent disposal of high-level radioactive waste, building on the experience of Defense Waste Processing Facility (DWPF) at the Savannah River site, South Carolina, and of the West Valley Demonstration Plant (WVDP), New York. This sequential approach to disposal of the country's commercial and defense high-level radioactive waste allows HWVP to make extensive use of lessons learned from the experience of its predecessors, using mature designs from the earlier facilities to achieve economies in design and construction costs while enhancing operational effectiveness

  10. The use of intelligent systems for risk management in software projects

    Directory of Open Access Journals (Sweden)

    Oksana A. Gushchina

    2017-06-01

    Full Text Available Introduction: The article identifies the main risks of a software project, examines the use of different types of intelligent systems in the risk management process for software projects, discusses the basic methods used for process estimation and forecasting in the field of software engineering, identifies currently used empty expert systems, software systems for analysis and risk management of software projects. Materials and Methods: The author describes the peculiarities of risk management in the field of software engineering with involvement of intelligent systems. The intelligent techniques allow solving the control task with expert precision without the involvement of human experts. Results: The result of this work: – identification of the key risks of a software project (tax, legal, financial and commercial risks, IT risks, personnel risks, risks related to competitors, suppliers, marketing and demand and market; – investigation of the current, applied to risk management of software system projects, artificial intelligence, particularly expert systems and software tools for evaluation of the process results; – identification of the most popular empty expert systems (Clips, G2 and Leonardo and software products of the analysis of large databases (Orange, Weka, Rattle GUI, Apache Mahout, SCaViS, RapidMiner, Databionic ESOM Tools, ELKI, KNIME, Pandas and UIMA; – consideration of the cluster, correlation, regression, factor and dispersion analysis methods for the estimation and prediction of the processes of software engineering. Discussion and Conclusions: The results show the feasibility of the application of various intelligent systems in the risk management process. The analysis of methods of evaluating risks and the tendency of their application in the modern systems of intellectual analysis can serve as a start point for creating a unified system of risk management for software projects of medium and high complexity with a

  11. Involving the public into HEP through IT challenges and projects

    CERN Document Server

    Adam Bourdarios, Claire; The ATLAS collaboration

    2016-01-01

    The ATLAS collaboration has recently setup three outreach projects and global challenges which have a strong IT component and could not have been envisaged without the growth of general public computing resources and network connectivity. HEP has exciting and difficult problems like the extraction of the Higgs boson signal, and at the same time data scientists have advanced algorithms. The goal of the Higgs Machine Learning (HiggsML) project was to bring the two together by a “challenge”: machine learning experts could compete online to obtain the best Higgs→ττ signal significance on a set of ATLAS fully simulated Monte Carlo signal and background events. The first challenge of this kind ran from May to September 2014, drawing considerable attention, and new projects followed in the context of the CERN open data initiative. Higgs Hunters is the only physics-related project hosted on a web-based citizen science platform called Zooniverse. Volunteers usually contributing to space, natural world and huma...

  12. Building Productivity in Virtual Project Teams

    Directory of Open Access Journals (Sweden)

    Bill Hamersly

    2015-04-01

    Full Text Available The steady increase in project failure rates is leaving businesses searching for better integration techniques to virtualize their project environments. Through virtualization, organizations may have positive impacts on communities across geographical boundaries and resource constraints. The focus of this phenomenological study was to explore, via the experiences of successful project management practitioners, best practice strategies for integrating virtual project teams through data analysis. The conceptual framework included von Bertalanffy’s general systems theory, decomposition model of business process and project management frameworks, and the recomposition approach. Twenty-two senior project managers with more than 5 years of experience managing virtual project environments participated in semistructured telephone interviews. The van Kaam process employing normalization and bracketing approaches in data analysis resulted in the emergence of 34 thematic categories. The 10 most common themes culminated in the identification of strategies relevant for virtual project teams. The major themes pertained to 3 broad areas: (a structure that accommodates skills and technology for virtual team success, (b governance leading to efficient virtual project team management, and (c collaboration practices across diverse environments. This study involved the exploration of the experiences of the participants. Using the van Kaam method for normalization of the data and clustering like experiences into thematic statements, the study provided a plethora of new information concentrated on 10 themes that emerged.

  13. One project's waste is another project's resource

    International Nuclear Information System (INIS)

    Short, J.

    1997-01-01

    The author describes the efforts being made toward pollution prevention within the DOE complex, as a way to reduce overall project costs, in addition to decreasing the amount of waste to be handled. Pollution prevention is a concept which is trying to be ingrained into project planning. Part of the program involves the concept that ultimately the responsibility for waste comes back to the generator. Parts of the program involve efforts to reuse materials and equipment on new projects, to recycle wastes to generate offsetting revenue, and to increase awareness, accountability and incentives so as to stimulate action on this plan. Summaries of examples are presented in tables

  14. Early print-tuned ERP response with minimal involvement of linguistic processing in Japanese Hiragana strings.

    Science.gov (United States)

    Okumura, Yasuko; Kasai, Tetsuko; Murohashi, Harumitsu

    2014-04-16

    The act of reading leads to the development of specific neural responses for print, the most frequently reported of which is the left occipitotemporal N170 component of event-related potentials. However, it remains unclear whether this electrophysiological response solely involves print-tuned neural activities. The present study examined an early print-tuned event-related potential response with minimal involvement of linguistic processing in a nonalphabetic language. Japanese Hiragana words, nonwords, and alphanumeric symbol strings were presented rapidly and the task was to detect the change in color of a fixation cross to restrict linguistic processing. As a result, Hiragana words and nonwords elicited a larger posterior N1 than alphanumeric symbol strings bilaterally, irrespective of intercharacter spacing. The fact that this N1 was enhanced specifically for rapidly presented Hiragana strings suggests the existence of print-tuned neural processes that are relatively independent of the influence of linguistic processing.

  15. Access to the decision-making process: opportunities for public involvement in the facility decommissioning process of the United States Nuclear Regulatory Commission

    International Nuclear Information System (INIS)

    Cameron, F.X.

    1996-01-01

    This paper discusses recent initiatives taken by the United States Nuclear Regulatory Commission NRC) to effectively involve the public in decommissioning decisions. Initiatives discussed include the Commission's rulemaking to establish the radiological criteria for decommissioning, as well as public involvement methods that have been used on a site-by-site basis. As un example of public involvement, the NRC is currently in the process of developing generic rules on the radiological criteria for the decontamination and decommissioning of NRC-licensed sites. Not only was this proposed rule developed through an extensive and novel approach for public involvement, but it also establishes the basic provisions that will govern public involvement in future NRC decisions on the decommissioning of individual sites. The aim is to provide the public with timely information about all phases of the NRC staff to express concerns and make recommendations. Th NRC recognizes the value and the necessity of effective public involvement in its regulatory activities and has initiated a number of changes to its regulatory program to accomplish this. From the NRC's perspective, it is much easier and less costly to incorporate these mechanisms for public involvement into the regulatory program early in the process, rather than try to add them after considerable public controversy on an action has already been generated. The historical antecedents for initiatives mentioned, as well as 'lessons learned' from prior experience are also discussed. (author)

  16. United States Crystalline Repository Project - key research areas

    International Nuclear Information System (INIS)

    Patera, E.S.

    1986-01-01

    The Crystalline Repository Project is responsible for siting the second high-level nuclear waste repository in crystalline rock for the US Department of Energy. A methodology is being developed to define data and information needs and a way to evaluate that information. The areas of research the Crystalline Repository Project is involved in include fluid flow in a fractured network, coupled thermal, chemical and flow processes and cooperation in other nations and OECD research programs

  17. A practical data processing workflow for multi-OMICS projects.

    Science.gov (United States)

    Kohl, Michael; Megger, Dominik A; Trippler, Martin; Meckel, Hagen; Ahrens, Maike; Bracht, Thilo; Weber, Frank; Hoffmann, Andreas-Claudius; Baba, Hideo A; Sitek, Barbara; Schlaak, Jörg F; Meyer, Helmut E; Stephan, Christian; Eisenacher, Martin

    2014-01-01

    Multi-OMICS approaches aim on the integration of quantitative data obtained for different biological molecules in order to understand their interrelation and the functioning of larger systems. This paper deals with several data integration and data processing issues that frequently occur within this context. To this end, the data processing workflow within the PROFILE project is presented, a multi-OMICS project that aims on identification of novel biomarkers and the development of new therapeutic targets for seven important liver diseases. Furthermore, a software called CrossPlatformCommander is sketched, which facilitates several steps of the proposed workflow in a semi-automatic manner. Application of the software is presented for the detection of novel biomarkers, their ranking and annotation with existing knowledge using the example of corresponding Transcriptomics and Proteomics data sets obtained from patients suffering from hepatocellular carcinoma. Additionally, a linear regression analysis of Transcriptomics vs. Proteomics data is presented and its performance assessed. It was shown, that for capturing profound relations between Transcriptomics and Proteomics data, a simple linear regression analysis is not sufficient and implementation and evaluation of alternative statistical approaches are needed. Additionally, the integration of multivariate variable selection and classification approaches is intended for further development of the software. Although this paper focuses only on the combination of data obtained from quantitative Proteomics and Transcriptomics experiments, several approaches and data integration steps are also applicable for other OMICS technologies. Keeping specific restrictions in mind the suggested workflow (or at least parts of it) may be used as a template for similar projects that make use of different high throughput techniques. This article is part of a Special Issue entitled: Computational Proteomics in the Post

  18. Computer processing techniques in digital radiography research

    International Nuclear Information System (INIS)

    Pickens, D.R.; Kugel, J.A.; Waddill, W.B.; Smith, G.D.; Martin, V.N.; Price, R.R.; James, A.E. Jr.

    1985-01-01

    In the Department of Radiology and Radiological Sciences, Vanderbilt University Medical Center, and the Center for Medical Imaging Research, Nashville, TN, there are several activities which are designed to increase the information available from film-screen acquisition as well as from direct digital acquisition of radiographic information. Two of the projects involve altering the display of images after acquisition, either to remove artifacts present as a result of the acquisition process or to change the manner in which the image is displayed to improve the perception of details in the image. These two projects use methods which can be applied to any type of digital image, but are being implemented with images digitized from conventional x-ray film. One of these research endeavors involves mathematical alteration of the image to correct for motion artifacts or registration errors between images that will be subtracted. Another applies well-known image processing methods to digital radiographic images to improve the image contrast and enhance subtle details in the image. A third project involves the use of dual energy imaging with a digital radiography system to reconstruct images which demonstrate either soft tissue details or the osseous structures. These projects are discussed in greater detail in the following sections of this communication

  19. Forms And Methods Of Modern Russian Youth Involvement Into The Electoral Process

    Directory of Open Access Journals (Sweden)

    Aleksey D. Maslov

    2015-03-01

    Full Text Available In the present article authors analyzes forms and methods of modern Russian youth involvement in the electoral process. Involving young people in the electoral process is directly related to the problem of increasing the level of political culture in the society. This article presents the main forms of work to attract young people to participate in elections in our country, according to the Central Election Commission (CEC of Russia, some of the regional election commissions, the Russian Public Opinion Research Center (WCIOM. Authors note that at present there are more than one hundred and sixty legislative acts of the Russian Federation, which reflect certain aspects of the state youth policy. All these measures stimulate the political activity of young people, but in our opinion, that is not enough. The fundamental change in the attitude of young people to politics, to the institution of elections is possible only when young people feel like a real part and the subject of transformation processes in our country. In conclusion authors summarizes, that a fundamental change in the relationship of young people to politics, the institution of elections is possible only, when very young feel a real party and the subject of transformation processes in our country. This is possible only when the state is really and not formally prioritizes youth policy. Young people should have a daily state support for education, starting a business, implementation of acquired skills for a decent fee, starting a family, buying a house, etc.

  20. 3D sound in the telepresence project BEAMING

    DEFF Research Database (Denmark)

    Olesen, Søren Krarup; Markovic, Milos; Madsen, Esben

    2012-01-01

    three applications: A general purpose theatrical scene, a teaching situation and a medical patient-visiting-doctor scenario. The March 2012 project review deals with the teaching situation. This involves a single microphone recording followed by signal processing that reconstructs the spatial content......The involvement of Aalborg University in the EU project BEAMING will be presented. BEAMING deals with telepresence including multiple modalities; vision, haptics and audio, of which the latter is of main interest here. The setup consists of two types of locations: The Destination, where the Locals...... for the Visitor, 3D audio is provided through headphones. It is rendered based on the Locals' coordinates via a common Internet database including local positional tracking to ensure that information on the Visitor's head rotation has a minimum delay through the network. The BEAMING project currently addresses...

  1. A quality assurance program for environmental data operations involving waste management processes

    International Nuclear Information System (INIS)

    Johnson, G.L.; Blacker, S.M.

    1990-01-01

    This paper describes the 'core' elements needed in an effective Quality Program for environmental data operations involving nuclear, mixed, or non-nuclear wastes. For each core element, this paper examines the minimum components needed for an effective Quality Program for EDOs, and compares approaches to Quality Programs currently required by the U.S. DOE and the U.S. EPA. The comparison suggests how the Quality Program requirements used at DOE, and defined by NQA-1 and its supplements, and those used by EPA through its QAMS program guidance, may provide a basis for developing a harmonized Quality Program for EDOs involving any waste management processes, nuclear, non-nuclear, or mixed. (orig./DG)

  2. Local involvement in CDM biogas projects: Argentine experiences

    NARCIS (Netherlands)

    Serna Martín, A.; Dietz, T.

    2008-01-01

    Mitigating climate change and contributing to the sustainable development of host countries are the goals of the CDM. In order to achieve these goals, projects follow an implementation chain, which starts with the design and ends with the issuance of Certified Emission Reductions (CERs). During the

  3. Influences of Government Championship on the Technology Innovation Process at the Project-level

    Science.gov (United States)

    Yue, Xin

    Government support is a popular instrument to foster technology innovation. It can take various forms such as financial aid, tax credits, and technological assistance. Along with the firm characteristics, strategic behavior of the project team, characteristics of the technology and the market, and the regulatory environment, government support influences firms' research and development (R&D) motivations, decision making process, and hence technology development performance. How government support influences the performance in different industries is an important policy and research question. There are many studies on the effectiveness and impacts of government support, mostly at program-level or industry-level. Government Championship is a form of government support distinct from direct financial or technological assistance. Championship includes expressing confidence in the innovation, encouraging others to support the innovation, and persisting under adversity. Championship has been studied as a critical inside factor for innovation success, particularly at project-level. Usually a champion emerged within the organization responsible for the innovation project. However, with the intention to encourage technology development, governments can also play a championship role. Government championship, besides government financial and technological assistance (hereafter "government F&T"), could be one major category of government support to facilitate high-technology innovation. However, there are few studies focusing on the effectiveness of government championship, and how it influences the innovation process. This thesis addresses this question through two studies on high-technology development projects. The first study has tested the effectiveness of government championship on the performance of 431 government sponsored technology innovation projects. Government championship and government F&T, as well as project team strategic behavior, are hypothesized to influence

  4. Exploring the dynamics of ownership in community-oriented design projects

    DEFF Research Database (Denmark)

    Light, Ann; Hansen, Nicolai Brodersen; Halskov, Kim

    2013-01-01

    This paper contributes an exploration of ownership as a dynamic process in community-oriented projects. We use case study accounts of two design projects to consider participation in contexts where social structure is relevant to design outcomes. In studying these dynamics, we consider four aspec...... community groups in making internet radio podcasts to share insight. We examine the complexity of the social process involved and trace patterns of change, before concluding with pragmatic and ethical reasons for technology design to pay attention to ownership issues....

  5. Producing hydrogen from coke-oven gas: the Solmer project. [PSA process

    Energy Technology Data Exchange (ETDEWEB)

    Bernard, G; Vidal, J

    1984-05-01

    After presenting the energy situation at the Solmer plant, where coke-oven gas is produced to excess, the authors examine the technical and economic possibilities of utilizing this gas for hydrogen extraction. They describe a project (based on the PSA process) for producing some 65 t/d of hydrogen and present the technical features of the scheme. An evaluation of the energy and financial costs of producing the hydrogen confirms the competitive status of the process.

  6. Data-driven fault detection for industrial processes canonical correlation analysis and projection based methods

    CERN Document Server

    Chen, Zhiwen

    2017-01-01

    Zhiwen Chen aims to develop advanced fault detection (FD) methods for the monitoring of industrial processes. With the ever increasing demands on reliability and safety in industrial processes, fault detection has become an important issue. Although the model-based fault detection theory has been well studied in the past decades, its applications are limited to large-scale industrial processes because it is difficult to build accurate models. Furthermore, motivated by the limitations of existing data-driven FD methods, novel canonical correlation analysis (CCA) and projection-based methods are proposed from the perspectives of process input and output data, less engineering effort and wide application scope. For performance evaluation of FD methods, a new index is also developed. Contents A New Index for Performance Evaluation of FD Methods CCA-based FD Method for the Monitoring of Stationary Processes Projection-based FD Method for the Monitoring of Dynamic Processes Benchmark Study and Real-Time Implementat...

  7. A non-linear decision making process for public involvement in environmental management activities

    International Nuclear Information System (INIS)

    Harper, M.R.; Kastenberg, W.

    1995-01-01

    The international industrial and governmental institutions involved in radioactive waste management and environmental remediation are now entering a new era in which they must significantly expand public involvement. Thus the decision making processes formerly utilized to direct and guide these institutions must now be shifted to take into consideration the needs of many more stakeholders than ever before. To meet this challenge, they now have the job of developing and creating a new set of accurate, sufficient and continuous self-regulating and self-correcting information pathways between themselves and the many divergent stakeholder groups in order to establish sustainable, trusting and respectful relationships. In this paper the authors introduce a new set of non-linear, practical and effective strategies for interaction. These self-regulating strategies provide timely feedback to a system, establishing trust and creating a viable vehicle for staying open and responsive to the needs out of which change and balanced adaptation can continually emerge for all stakeholders. The authors present a decision making process for public involvement which is congruent with the non-linear ideas of holographic and fractal relationships -- the mutual influence between related parts of the whole and the self-symmetry of systems at every level of complexity

  8. Recent experiences with independent power projects

    International Nuclear Information System (INIS)

    Kline, R.H.; Fitzowitch, J.R.; Dalla-Longa, L.

    1999-01-01

    New opportunities are making it possible to develop independent power projects involving partnerships with the electric power industry, and the petroleum and natural gas industry . This paper described those opportunities, the impediments and the risks involved. Mercury Electric Corp. has been involved in power projects at remote gas field and oil field sites where they use of a turbogenerator which runs on flare gas to generate electricity. TransCanada Power's involvement in independent power projects includes the supply and transport of gas and their ability to provide gas fired combined cycle technology. They are involved in a project at Hermiston, Oregon and also in a cogeneration project in Medicine Hat, Alberta. The CanCarb City of Medicine Hat project makes use of waste heat at an industrial facility. 11 figs

  9. System supplier approach to projects and operations efficiency

    Energy Technology Data Exchange (ETDEWEB)

    Moe, P O [Siemens Offshore A/S (Norway)

    1994-12-31

    The conference paper outlines the most important elements for a new approach to project realisation that enable a cost reduction of 30-50% compared to conventional methods. The achievements are based on studies and evaluations to the Norwegian Vigdis development project. The system elements covered are the electrical and automation systems including safety and process control and all traditional phases of a project from concept design to the operational phase. The concept involves new principles for project execution where traditional borderlines and interfaces between the various participants have been redefined. Management attention has been verified as an important prerequisite for a successful implementation of this strategy. 2 figs.

  10. Teaching American Politics through Student Projects: Electoral Reform Issues and Political Change.

    Science.gov (United States)

    Alper, Donald K.; Hogan, Eugene

    1979-01-01

    Describes two projects which involve college students in political science courses on American politics in doing research and giving class reports on proposals for reforming the electoral college and the electoral process. Findings indicate that students participating in the projects become more aware of political realities and learn how to use…

  11. Integrating chemical engineering fundamentals in the capstone process design project

    DEFF Research Database (Denmark)

    von Solms, Nicolas; Woodley, John; Johnsson, Jan Erik

    2010-01-01

    Reaction Engineering. In order to incorporate reactor design into process design in a meaningful way, the teachers of the respective courses need to collaborate (Standard 9 – Enhancement of Faculty CDIO skills). The students also see that different components of the chemical engineering curriculum relate......All B.Eng. courses offered at the Technical University of Denmark (DTU) must now follow CDIO standards. The final “capstone” course in the B.Eng. education is Process Design, which for many years has been typical of chemical engineering curricula worldwide. The course at DTU typically has about 30...... of the CDIO standards – especially standard 3 – Integrated Curriculum - means that the course projects must draw on competences provided in other subjects which the students are taking in parallel with Process Design – specifically Process Control and Reaction Engineering. In each semester of the B...

  12. Dual Headquarters Involvement in Multibusiness Firms

    DEFF Research Database (Denmark)

    Nell, Phillip Christopher; Kappen, Philip; Dellestrand, Henrik

    The strategy literature has shown that headquarters involve themselves into subsidiary operations to add value. Yet, little is known about the extent to which multiple headquarters do so. Therefore, we investigate antecedents of corporate and divisional headquarters’ involvement in innovation...... development projects of subsidiaries. Analyses of 85 innovation development projects reveal that dual innovation importance (innovation that is important for the division and the rest of the firm), and dual dual embeddedness (innovating subsidiary is embedded both within the division and in the rest...... of the firm) lead to greater dual headquarters involvement, especially when the innovation development network is large. The results contribute to the literature on complex parenting and theory of selective headquarters involvement....

  13. Wind energy planning in England, Wales and Denmark: Factors influencing project success

    International Nuclear Information System (INIS)

    McLaren Loring, Joyce

    2007-01-01

    Land-use planning poses a significant barrier to the further development of on-shore wind energy in many countries. There has been increasing discussion regarding the use of public participation in the planning process in order to address concerns of local residents and ease conflicts. This research explores the dynamics of the planning process for wind energy in England, Wales and Denmark in order to better understand the factors influencing project success. Through 18 in-depth case studies, it investigates the degree of local community participation in the planning process and the stability of the network of individuals and organisations involved in the project to determine their relationship to the public's acceptance of the project and the planning outcome. The study draws on the frameworks of public participation in planning and actor-network theories in order to develop indicators of the level of community involvement and network formation for each case. The analysis discusses predictions made by the theoretical approaches as to the importance of these variables to the success of new projects. The results indicate that projects with high levels of participatory planning are more likely to be publicly accepted and successful. In addition, stable supporting networks are more likely to form. The presence of a stable network of supporters is not found to be related to project acceptance and success; however, the absence of a stable network of opponents is found to be necessary for project acceptance and success in receiving planning permission

  14. Lessons learned in process control at the Halden Reactor Project

    International Nuclear Information System (INIS)

    Kennedy, W.G.

    1989-12-01

    This report provides a list of those findings particularly relevant to regulatory authorities that can be derived from the research and development activities in computerized process control conducted at the Halden Reactor Project. The report was prepared by a staff member of the US Nuclear Regulatory Commission working at Halden. It identifies those results that may be of use to regulatory organizations in three main areas: as support for new requirements, as part of regulatory evaluations of the acceptability of new methods and techniques, and in exploratory research and development of new approaches to improve operator performance. More than 200 findings arranged in nine major categories are presented. The findings were culled from Halden Reactor Project documents, which are listed in the report

  15. Product development projects dynamics and emergent complexity

    CERN Document Server

    Schlick, Christopher

    2016-01-01

    This book primarily explores two topics: the representation of simultaneous, cooperative work processes in product development projects with the help of statistical models, and the assessment of their emergent complexity using a metric from theoretical physics (Effective Measure Complexity, EMC). It is intended to promote more effective management of development projects by shifting the focus from the structural complexity of the product being developed to the dynamic complexity of the development processes involved. The book is divided into four main parts, the first of which provides an introduction to vector autoregression models, periodic vector autoregression models and linear dynamical systems for modeling cooperative work in product development projects. The second part presents theoretical approaches for assessing complexity in the product development environment, while the third highlights and explains closed-form solutions for the complexity metric EMC for vector autoregression models and linear dyn...

  16. The Interplay Between Evidence and Judgment in the IT Project Prioritization Process

    DEFF Research Database (Denmark)

    Shollo, Arisa; Constantiou, Ioanna; Kreiner, Kristian

    2015-01-01

    Strategic decisions concerning IT investments are based on a project prioritization process designed to accommodate evidence-based management and rational decision-making. Our empirical study of IT project prioritization in a financial institution shows how managers reach decisions under norms...... of evidence-based management. We use a rich dataset derived from a longitudinal study. We analyze managers’ decision-making practices and identify four tactics of supplementing, substituting, interpreting, and reframing the available evidence. The choice of tactic depends on how decision makers perceive...

  17. Talking About The Smokes: a large-scale, community-based participatory research project.

    Science.gov (United States)

    Couzos, Sophia; Nicholson, Anna K; Hunt, Jennifer M; Davey, Maureen E; May, Josephine K; Bennet, Pele T; Westphal, Darren W; Thomas, David P

    2015-06-01

    To describe the Talking About The Smokes (TATS) project according to the World Health Organization guiding principles for conducting community-based participatory research (PR) involving indigenous peoples, to assist others planning large-scale PR projects. The TATS project was initiated in Australia in 2010 as part of the International Tobacco Control Policy Evaluation Project, and surveyed a representative sample of 2522 Aboriginal and Torres Strait Islander adults to assess the impact of tobacco control policies. The PR process of the TATS project, which aimed to build partnerships to create equitable conditions for knowledge production, was mapped and summarised onto a framework adapted from the WHO principles. Processes describing consultation and approval, partnerships and research agreements, communication, funding, ethics and consent, data and benefits of the research. The TATS project involved baseline and follow-up surveys conducted in 34 Aboriginal community-controlled health services and one Torres Strait community. Consistent with the WHO PR principles, the TATS project built on community priorities and strengths through strategic partnerships from project inception, and demonstrated the value of research agreements and trusting relationships to foster shared decision making, capacity building and a commitment to Indigenous data ownership. Community-based PR methodology, by definition, needs adaptation to local settings and priorities. The TATS project demonstrates that large-scale research can be participatory, with strong Indigenous community engagement and benefits.

  18. A Collaborative Approach to Defining the Usefulness of Impact: Lessons from a Knowledge Exchange Project Involving Academics and Social Work Practitioners

    Science.gov (United States)

    Wilkinson, Heather; Gallagher, Michael; Smith, Mark

    2012-01-01

    This paper reports on a knowledge exchange project involving academics and practitioners in six local authority social work departments. It contributes to recent debates about the coproduction of knowledge, presenting findings in three key areas: the importance of relationships for knowledge exchange; "what works" for practitioners…

  19. Implementing The Safeguards-By-Design Process

    International Nuclear Information System (INIS)

    Whitaker, J. Michael; McGinnis, Brent; Laughter, Mark D.; Morgan, Jim; Bjornard, Trond; Bean, Robert; Durst, Phillip; Hockert, John; DeMuth, Scott; Lockwood, Dunbar

    2010-01-01

    The Safeguards-by-Design (SBD) approach incorporates safeguards into the design and construction of nuclear facilities at the very beginning of the design process. It is a systematic and structured approach for fully integrating international and national safeguards for material control and accountability (MC and A), physical protection, and other proliferation barriers into the design and construction process for nuclear facilities. Implementing SBD is primarily a project management or project coordination challenge. This paper focuses specifically on the design process; the planning, definition, organization, coordination, scheduling and interaction of the safeguards experts and stakeholders as they participate in the design and construction of a nuclear facility. It delineates the steps in a nuclear facility design and construction project in order to provide the project context within which the safeguards design activities take place, describes the involvement of the safeguards experts in the design process, the nature of their analyses, interactions and decisions, and describes the documents created and how they are used. This report highlights the project context of safeguards activities, and identifies the safeguards community (nuclear facility operator, designer/builder, state regulator, SSAC and IAEA) must accomplish in order to implement SBD within the project.

  20. Integrated project delivery methods for energy renovation of social housing

    Directory of Open Access Journals (Sweden)

    Tadeo Baldiri Salcedo Rahola

    2015-11-01

    renting them. As such, SHOs are used to dealing with renovations on a professional basis. The limited financial capacity of SHOs to realise energy renovations magnifies the importance of improving process performance in order to get the best possible outcomes. In the last 30 years numerous authors have addressed the need to improve the performance of traditional construction processes via alternative project delivery methods. However, very little is known about the specifics of renovations processes for social housing, the feasibility of applying innovative construction management methods and the consequences for the process, for the role of all the actors involved and for the results of the projects. The aim of this study is to provide an insight into the project delivery methods available for SHOs when they are undertaking energy renovation projects and to evaluate how these methods could facilitate the achievement of a higher process performance. The main research question is: How can Social Housing Organisations improve the performance of energy renovation processes using more integrated project delivery methods? The idea of a PhD thesis about social housing renovation processes originated from the participation of TU Delft as research partner in the Intelligent Energy Europe project SHELTER1 which was carried out between 2010 and 2013. The aim of the SHELTER project was to promote and facilitate the use of new models of cooperation, inspired by integrated design, for the energy renovation of social housing. The SHELTER project was a joint effort between six social housing organisations (Arte Genova, Italy; Black Country Housing Group, United Kingdom; Bulgarian Housing Association, Bulgaria; Dynacité, France; Logirep, France and Société Wallonne du Logement, Belgium, three European professional federations based in Brussels (Architects Council of Europe, Cecodhas Housing Europe and European Builders Confederation and one research partner (Delft University of

  1. Kenya public weather processed by the Global Yield Gap Atlas project

    NARCIS (Netherlands)

    Groot, de Hugo; Adimo, Ochieng; Claessens, Lieven; Wart, Van Justin; Bussel, van Lenny G.J.; Grassini, Patricio; Wolf, Joost; Guilpart, Nicolas; Boogaard, Hendrik; Oort, van Pepijn A.J.; Yang, Haishun S.; Ittersum, van Martin K.; Cassman, Kenneth G.

    2017-01-01

    The Global Yield Gap Atlas project (GYGA - http://yieldgap.org) has undertaken a yield gap assessment following the protocol recommended by van Ittersum et al. (2013). One part of the activities consists of collecting and processing weather data as an input for crop simulation models in sub-Saharan

  2. Pep-up: A review of the Umgeni Valley Project evaulation process ...

    African Journals Online (AJOL)

    Pep-up: A review of the Umgeni Valley Project evaulation process. Tim Wright. Abstract. No Abstract. Full Text: EMAIL FREE FULL TEXT EMAIL FREE FULL TEXT · DOWNLOAD FULL TEXT DOWNLOAD FULL TEXT · Creative Commons License This work is licensed under a Creative Commons Attribution 3.0 License.

  3. Managing Service Development (SaaS) as a project: business process modeling

    OpenAIRE

    Iliadi, Vasiliki; Ηλιάδη, Βασιλική

    2017-01-01

    In the context of the present thesis, we will be studying core principles of Business Process Management, and how we can take advantage of them in combination with Project Management Methodologies and modeling tools in the context of Software as a Service businesses and their development. Initially we provide the reader with an introduction to Business Process Management, how it can be used, and how the life cycle is structured. We further define the first three phases of the life cycle to...

  4. Reclamation project at an abandoned deep mine

    Energy Technology Data Exchange (ETDEWEB)

    Wilkey, M.; Zellmer, S.

    1978-01-01

    The total reclamation of any site requires time, physical control of the site, favorable natural conditions, and a considerable capital investment. It must be realized that processes involving biological systems require time to become established and self-sustaining. The Staunton 1 project has been designed to provide data on many aspects of the reclamation process. Data collected to date indicate a significant improvement in overall environmental quality, a substantial increase in the economic potential of the site and adjacent properties, and a genuine enhancement of the entire area's aesthetic value. The Staunton 1 Reclamation Demonstration Project, in addition to reclaiming this one site, will provide the necessary design data for future reclamation efforts of this type.

  5. Communication Lillgrund. Lillgrund Pilot Project

    Energy Technology Data Exchange (ETDEWEB)

    Karlsson, Annah (Vattenfall Vindkraft AB, Stockholm (Sweden))

    2008-09-15

    The project of building a large wind farm like Lillgrund, the third largest offshore wind farm in the world, takes a considerable effort when it comes to communication and information. When the main questions 'What should be communicated?', 'To whom should this information be communicated?' and 'How should the information be communicated?' are answered, it is time to take action and actually communicate and inform. A fundamental part of the communication process is psychology. For the entrepreneur to understand that people are worried about the possible change in their living situation and deal with that is essential for how people are going to react to the plans of a potential wind farm. When Vattenfall bought the Lillgrund project a humble tone and availability were two key components in the way in which the project group approached the local residents, authorities and the general public. The goal was to achieve acceptance from the local residents and authorities and make them feel comfortable with the project and Vattenfall. Communication has been a cornerstone of the project during the whole process. A few of the activities that were carried out are media activities, open meetings for the public, exhibitions, advertisements, meetings with authorities, internal and external study visits to the site, cooperation with Malmoe city, participation in conferences and a grand opening ceremony. The basis for the activities has been the active inviting of organisations, neighbours and others. Thanks to the efforts of the whole project group and all others that were involved, the communication process was very successful. The 'Lillgrund model' will be the foundation for coming communication processes and has provided Vattenfall with a lot of experience regarding communication and information issues

  6. Stakeholder involvement in other sectors. High Voltage Electricity Transmission. Case study: CO_2 capture and storage. Common misconceptions on stakeholder involvement - Reviewing deployment of RES

    International Nuclear Information System (INIS)

    Wolsink, Maarten; Komendantova, Nadejda; Kalaydjian, Francois

    2017-01-01

    Komendantova of the International Institute for Applied Systems Analysis pointed out that at higher levels of involvement several different ways can be found to share power. These include distributing responsibilities for planning and decision making (partnership) or allocating a majority of seats on review committees to citizen representatives (citizen control). Alongside choosing the right level of involvement, the approach must be tailored to the setting. Ms Komendantova presented the BESTGRID research project in the European Union, which tested and studied alternative approaches to stakeholder engagement in trans-border high-voltage transmission line projects. Different methods may be needed for engaging specific sets of people, according to such factors as age, technological familiarity, geographic situation and possibly national culture. Mr Kalaydjian pointed to the research project SiteChar-CO2, juxtaposing the reasoning of stakeholders in different locations (in Poland and in Scotland) who held different levels of knowledge of carbon capture and storage technology, and who varied in their proximity to the proposed pilot sites. Their views on economics, risks, etc. in each case also had distinct implications in terms of expected actions by national actors or by local site operators. Stakeholder concerns can be mapped into several main areas, which were echoed by the various studies presented in Session 7. Mr Wolsink insisted on the issue of perceived need for the project, and stakeholders' demand to choose among real options. He described a failed wind power development in the early 2000's which excluded local stakeholders with knowledge and interests in the proposed locations, considered only a narrow set of alternatives without meaningful distinctions between them, and utilised a technocratic decision process that selected an implementation with significant opposition when other locations would have been generally acceptable to stakeholders. BESTGRID found that areas

  7. The role of the Industrial Bank of Japan in financing gas projects

    International Nuclear Information System (INIS)

    Kajiwara, Yasushi

    1991-01-01

    This paper concerns liquefied natural gas projects, or LNG projects for short, and more specifically, how the Industrial Bank of Japan, IBJ, as a private bank has been involved in many projects, and how the bank has solved a range of problems encountered in the process of financing such projects. After that, the author's personal views are expressed on how to tackle the future development of LNG, an energy source that will become increasingly important in the future

  8. High Level Waste Tank Farm Replacement Project for the Idaho Chemical Processing Plant at the Idaho National Engineering Laboratory

    International Nuclear Information System (INIS)

    1993-06-01

    The Department of Energy (DOE) has prepared an environmental assessment (EA), DOE/EA-0831, for the construction and operation of the High-Level Waste Tank Farm Replacement (HLWTFR) Project for the Idaho Chemical Processing Plant located at the Idaho National Engineering Laboratory (INEL). The HLWTFR Project as originally proposed by the DOE and as analyzed in this EA included: (1) replacement of five high-level liquid waste storage tanks with four new tanks and (2) the upgrading of existing tank relief piping and high-level liquid waste transfer systems. As a result of the April 1992 decision to discontinue the reprocessing of spent nuclear fuel at INEL, DOE believes that it is unlikely that the tank replacement aspect of the project will be needed in the near term. Therefore, DOE is not proposing to proceed with the replacement of the tanks as described in this-EA. The DOE's instant decision involves only the proposed upgrades aspect of the project described in this EA. The upgrades are needed to comply with Resource Conservation and Recovery Act, the Idaho Hazardous Waste Management Act requirements, and the Department's obligations pursuant to the Federal Facilities Compliance Agreement and Consent Order among the Environmental Protection Agency, DOE, and the State of Idaho. The environmental impacts of the proposed upgrades are adequately covered and are bounded by the analysis in this EA. If DOE later proposes to proceed with the tank replacement aspect of the project as described in the EA or as modified, it will undertake appropriate further review pursuant to the National Environmental Policy Act

  9. Project T.E.A.M. (Technical Education Advancement Modules). Advanced Statistical Process Control.

    Science.gov (United States)

    Dunlap, Dale

    This instructional guide, one of a series developed by the Technical Education Advancement Modules (TEAM) project, is a 20-hour advanced statistical process control (SPC) and quality improvement course designed to develop the following competencies: (1) understanding quality systems; (2) knowing the process; (3) solving quality problems; and (4)…

  10. Nuclear facility projects in Finland: quality of environmental impact assessment (EIA) processes

    International Nuclear Information System (INIS)

    Vaatainen, A.

    2001-01-01

    In Finland, three public EIA hearings arranged by the contact authority concerning nuclear facilities were organised in 1999: the EIAs of two reactors planned to be constructed in Eurajoki (Olkiluoto) and in Loviisa, and the EIA of a final disposal facility of spent nuclear fuel, to be situated either in Olkiluoto, Loviisa, Romuvaara or Kivetty. Additionally, an application for a decision-in-principle concerning a final disposal facility to be constructed in Olkiluoto was submitted. The Ministry of Trade and Industry is the contact authority in all nuclear projects in Finland. Probably due to the simultaneity of the processes and the great importance of nuclear facility projects to the whole of society, the public opinions did not include only views about environmental impacts of each project, but also opposing and overall views about the use of nuclear energy and its safety. As for the final disposal project, alternative methods were introduced and opposition to the project itself was expressed instead of or in addition to the environmental impacts. (author)

  11. Motor cortical processing is causally involved in object recognition.

    Science.gov (United States)

    Decloe, Rebecca; Obhi, Sukhvinder S

    2013-12-14

    Motor activity during vicarious experience of actions is a widely reported and studied phenomenon, and motor system activity also accompanies observation of graspable objects in the absence of any actions. Such motor activity is thought to reflect simulation of the observed action, or preparation to interact with the object, respectively. Here, in an initial exploratory study, we ask whether motor activity during observation of object directed actions is involved in processes related to recognition of the object after initial exposure. Single pulse Transcranial Magnetic Stimulation (TMS) was applied over the thumb representation of the motor cortex, or over the vertex, during observation of a model thumb typing on a cell-phone, and performance on a phone recognition task at the end of the trial was assessed. Disrupting motor processing over the thumb representation 100 ms after the onset of the typing video impaired the ability to recognize the phone in the recognition test, whereas there was no such effect for TMS applied over the vertex and no TMS trials. Furthermore, this effect only manifested for videos observed from the first person perspective. In an additional control condition, there was no evidence for any effects of TMS to the thumb representation or vertex when observing and recognizing non-action related shape stimuli. Overall, these data provide evidence that motor cortical processing during observation of object-directed actions from a first person perspective is causally linked to the formation of enduring representations of objects-of-action.

  12. Developing Federated Services within Seismology: IRIS' involvement in the CoopEUS Project

    Science.gov (United States)

    Ahern, T. K.; Trabant, C. M.; Stults, M.

    2014-12-01

    As a founding member of the CoopEUS initiative, IRIS Data Services has partnered with five data centers in Europe and the UC Berkeley (NCEDC) in the US to implement internationally standardized web services to access seismological data using identical methodologies. The International Federation of Digital Seismograph Networks (FDSN) holds commission status within IASPEI/IUGG and as such is the international body that governs data exchange formats and access protocols within seismology. The CoopEUS project involves IRIS and UNAVCO as part of the EarthScope project and the European collaborators are all members of the European Plate Observing System (EPOS). CoopEUS includes one work package that attempts to coordinate data access between EarthScope and EPOS facilities. IRIS has worked with its partners in the FDSN to develop and adopt three key international service standards within seismology. These include 1) fdsn-dataselect, a service that returns time series data in a variety of standard formats, 2) fdsn-station, a service that returns related metadata about a seismic station in stationXML format, and 3) fdsn-event, a service that returns information about earthquakes and other seismic events in QuakeML format. Currently the 5 European data centers supporting these services include the ORFEUS Data Centre in the Netherlands, the GFZ German Research Centre for Geosciences in Potsdam, Germany, ETH Zurich in Switzerland, INGV in Rome, Italy, and the RESIF Data Centre in Grenoble France. Presently these seven centres can all be accessed using standardized web services with identical service calls and returns results in standardized ways. IRIS is developing an IRIS federator that will allow a client to seamlessly access information across the federated centers. Details and current status of the IRIS Federator will be presented.

  13. Child involvement, alliance, and therapist flexibility: process variables in cognitive-behavioural therapy for anxiety disorders in childhood.

    Science.gov (United States)

    Hudson, Jennifer L; Kendall, Philip C; Chu, Brian C; Gosch, Elizabeth; Martin, Erin; Taylor, Alan; Knight, Ashleigh

    2014-01-01

    This study examined the relations between treatment process variables and child anxiety outcomes. Independent raters watched/listened to taped therapy sessions of 151 anxiety-disordered (6-14 yr-old; M = 10.71) children (43% boys) and assessed process variables (child alliance, therapist alliance, child involvement, therapist flexibility and therapist functionality) within a manual-based cognitive-behavioural treatment. Latent growth modelling examined three latent variables (intercept, slope, and quadratic) for each process variable. Child age, gender, family income and ethnicity were examined as potential antecedents. Outcome was analyzed using factorially derived clinician, mother, father, child and teacher scores from questionnaire and structured diagnostic interviews at pretreatment, posttreatment and 12-month follow-up. Latent growth models demonstrated a concave quadratic curve for child involvement and therapist flexibility over time. A predominantly linear, downward slope was observed for alliance, and functional flexibility remained consistent over time. Increased alliance, child involvement and therapist flexibility showed some albeit inconsistent, associations with positive treatment outcome. Findings support the notion that maintaining the initial high level of alliance or involvement is important for clinical improvement. There is some support that progressively increasing alliance/involvement also positively impacts on treatment outcome. These findings were not consistent across outcome measurement points or reporters. Copyright © 2013 Elsevier Ltd. All rights reserved.

  14. Current status on advanced aqueous reprocessing process (next) in FaCT project

    International Nuclear Information System (INIS)

    Washiya, Tadahiro; Myochin, Munetaka; Koyama, Tomozo

    2009-01-01

    Japan Atomic Energy Agency (JAEA) launched the Fast Reactor Cycle Technology Development (FaCT) project in cooperation with the Japanese electric utilities in 2006. An integration of the advanced aqueous reprocessing concept and the simplified pelletizing fuel fabrication was selected as the most promising fuel cycle system. In order to accomplish the integration, R and D tasks were launched as FaCT Project in 2006 by Japanese joint team. The New Extraction System for TRU Recovery (NEXT) system is an advanced aqueous reprocessing concept which was based on the well established aqueous reprocessing for LWR spent fuel and newly applied processes such as uranium crystallization and extraction chromatography for MAs recovery. Main task of the NEXT process is to develop the TRU recovery process and equipments with high reliability, criticality safety, high durability and remote maintainability. In the FaCT project, all innovative technologies are planned to be developed within the next decade focusing on the future commercialization of FBR cycle systems. The judgment of the adoption of each innovative technology will be made by 2010 based on the results of R and Ds. The development of each technology is to be completed by around 2015. By the same time, it is scheduled to present the conceptual design of commercial and demonstrative fast reactor cycle facilities. The six items (Disassembling and shearing, Fuel dissolution, Uranium Crystallization, Single cycle co-extraction of U, Pu and Np, MA recovery by extraction chromatography and Waste treatment) have been identified as the issues to be developed corresponding to each process step. Current R and D status and prospects of this system until around 2015 is reported. (author)

  15. Reducing RN Vacancy Rate: A Nursing Recruitment Office Process Improvement Project.

    Science.gov (United States)

    Hisgen, Stephanie A; Page, Nancy E; Thornlow, Deirdre K; Merwin, Elizabeth I

    2018-06-01

    The aim of this study was to reduce the RN vacancy rate at an academic medical center by improving the hiring process in the Nursing Recruitment Office. Inability to fill RN positions can lead to higher vacancy rates and negatively impact staff and patient satisfaction, quality outcomes, and the organization's bottom line. The Model for Improvement was used to design and implement a process improvement project to improve the hiring process from time of interview through the position being filled. Number of days to interview and check references decreased significantly, but no change in overall time to hire and time to fill positions was noted. RN vacancy rate also decreased significantly. Nurse manager satisfaction with the hiring process increased significantly. Redesigning the recruitment process supported operational efficiencies of the organization related to RN recruitment.

  16. BMR: Benchmarking Metrics Recommender for Personnel issues in Software Development Projects

    Directory of Open Access Journals (Sweden)

    Angel Garcia-Crespo

    2009-12-01

    Full Text Available This paper presents an architecture which applies document similarity measures to the documentation produced during the phases of software development in order to generate recommendations of process and people metrics for similar projects. The application makes a judgment of similarity of the Service Provision Offer (SPO document of a new proposed project to a collection of Project History Documents (PHD, stored in a repository of unstructured texts. The process is carried out in three stages: firstly, clustering of the Offer document with the set of PHDs which are most similar to it; this provides the initial indication of whether similar previous projects exist, and signifies similarity. Secondly, determination of which PHD in the set is most comparable with the Offer document, based on various parameters: project effort, project duration (time, project resources (members/size of team, costs, and sector(s involved, indicating comparability of projects. The comparable parameters are extracted using the GATE Natural Language Processing architecture. Lastly, a recommendation of metrics for the new project is made, which is based on the transferability of the metrics of the most similar and comparable PHD extracted, here referred to as recommendation.

  17. The development of stochastic process modeling through risk analysis derived from scheduling of NPP project

    International Nuclear Information System (INIS)

    Lee, Kwang Ho; Roh, Myung Sub

    2013-01-01

    There are so many different factors to consider when constructing a nuclear power plant successfully from planning to decommissioning. According to PMBOK, all projects have nine domains from a holistic project management perspective. They are equally important to all projects, however, this study focuses mostly on the processes required to manage timely completion of the project and conduct risk management. The overall objective of this study is to let you know what the risk analysis derived from scheduling of NPP project is, and understand how to implement the stochastic process modeling through risk management. Building the Nuclear Power Plant is required a great deal of time and fundamental knowledge related to all engineering. That means that integrated project scheduling management with so many activities is necessary and very important. Simulation techniques for scheduling of NPP project using Open Plan program, Crystal Ball program, and Minitab program can be useful tools for designing optimal schedule planning. Thus far, Open Plan and Monte Carlo programs have been used to calculate the critical path for scheduling network analysis. And also, Minitab program has been applied to monitor the scheduling risk. This approach to stochastic modeling through risk analysis of project activities is very useful for optimizing the schedules of activities using Critical Path Method and managing the scheduling control of NPP project. This study has shown new approach to optimal scheduling of NPP project, however, this does not consider the characteristic of activities according to the NPP site conditions. Hence, this study needs more research considering those factors

  18. The development of stochastic process modeling through risk analysis derived from scheduling of NPP project

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Kwang Ho; Roh, Myung Sub [KEPCO International Nuclear Graduate School, Ulsan (Korea, Republic of)

    2013-10-15

    There are so many different factors to consider when constructing a nuclear power plant successfully from planning to decommissioning. According to PMBOK, all projects have nine domains from a holistic project management perspective. They are equally important to all projects, however, this study focuses mostly on the processes required to manage timely completion of the project and conduct risk management. The overall objective of this study is to let you know what the risk analysis derived from scheduling of NPP project is, and understand how to implement the stochastic process modeling through risk management. Building the Nuclear Power Plant is required a great deal of time and fundamental knowledge related to all engineering. That means that integrated project scheduling management with so many activities is necessary and very important. Simulation techniques for scheduling of NPP project using Open Plan program, Crystal Ball program, and Minitab program can be useful tools for designing optimal schedule planning. Thus far, Open Plan and Monte Carlo programs have been used to calculate the critical path for scheduling network analysis. And also, Minitab program has been applied to monitor the scheduling risk. This approach to stochastic modeling through risk analysis of project activities is very useful for optimizing the schedules of activities using Critical Path Method and managing the scheduling control of NPP project. This study has shown new approach to optimal scheduling of NPP project, however, this does not consider the characteristic of activities according to the NPP site conditions. Hence, this study needs more research considering those factors.

  19. Role of Centrifugal Projections to the Olfactory Bulb in Olfactory Processing

    Science.gov (United States)

    Kiselycznyk, Carly L.; Zhang, Steven; Linster, Christine

    2006-01-01

    While there is evidence that feedback projections from cortical and neuromodulatory structures to the olfactory bulb are crucial for maintaining the oscillatory dynamics of olfactory bulb processing, it is not clear how changes in dynamics are related to odor perception. Using electrical lesions of the olfactory peduncle, sparing output from the…

  20. Projected evolution superoperators and the density operator

    International Nuclear Information System (INIS)

    Turner, R.E.; Dahler, J.S.; Snider, R.F.

    1982-01-01

    The projection operator method of Zwanzig and Feshbach is used to construct the time dependent density operator associated with a binary scattering event. The formula developed to describe this time dependence involves time-ordered cosine and sine projected evolution (memory) superoperators. Both Schroedinger and interaction picture results are presented. The former is used to demonstrate the equivalence of the time dependent solution of the von Neumann equation and the more familiar frequency dependent Laplace transform solution. For two particular classes of projection superoperators projected density operators are shown to be equivalent to projected wave functions. Except for these two special cases, no projected wave function analogs of projected density operators exist. Along with the decoupled-motions approximation, projected interaction picture density operators are applied to inelastic scattering events. Simple illustrations are provided of how this formalism is related to previously established results for two-state processes, namely, the theory of resonant transfer events, the first order Magnus approximation, and the Landau-Zener theory

  1. Managing supplier involvement in new product development: a portfolio approach

    NARCIS (Netherlands)

    Wynstra, Finn; ten Pierick, E.

    2000-01-01

    Supplier involvement in new product development projects has become an increasingly popular method for improving project effectiveness (product costs and quality) and project efficiency (development costs and time). One of the key issues in managing this involvement is determining which type of

  2. Radiation requirements for uranium project approvals

    International Nuclear Information System (INIS)

    Hondros, J.

    2014-01-01

    Uranium mining projects in Australia must receive approval under both state and national laws based on a wide ranging impact assessment of the project. The process may take a number of years and involves multiple levels and parts of government and public consultation and scrutiny. The impact assessment is broad and usually covers; environmental, social, health, public safety and economic aspects. Information provided in the approvals documentation needs to be presented in a credible and understandable manner for all audiences. This means making complex information simpler, while making sure that it maintains its technical integrity. Poorly communicated information, which is overly complex, overly simplified or incomplete, can result in significant delays to the project approval which can potentially impact on project timelines. For uranium projects, along with other projects involving radioactive materials, such as minerals sands and rare earths, radiation and its impacts usually draw a disproportionate amount of both government and public scrutiny compared to other potential impacts and risks. It is therefore of key importance that radiation assessments are properly performed and results clearly presented and communicated with sufficient detail for stakeholders to make informed decisions. It is also important to ensure that the radiation risk is presented in perspective with other risks of the project. This presentation outlines a structure for a radiation impact assessment based on experience from a number of projects in Australia. The structure aims to be clear and simple and ensure the right balance between scientific fact, digestible information and demonstrable competence. (author)

  3. The DIALOGUE project. Report from the Actors group

    International Nuclear Information System (INIS)

    1993-11-01

    The DIALOGUE project has been conducted by the Swedish Nuclear Power Inspectorate (SKI) since 1990. The aim of the project was to stimulate a dialogue between different interest groups within Sweden. The purpose of this dialogue was to establish a licensing process, prior to a future licensing of a repository for spent nuclear waste, in which several of the parties involved are reasonably confident. The DIALOGUE project was carried out with the participation of other government agencies, municipalities and environmental groups and was headed by the former chairman of the National Licensing Board for Environmental Protection

  4. DHA involvement in neurotransmission process

    OpenAIRE

    Vancassel Sylvie; Aïd Sabah; Denis Isabelle; Guesnet Philippe; Lavialle Monique

    2007-01-01

    The very high enrichment of the nervous system in the polyunsaturated fatty acids, arachidonic (AA, 20: 4n-6) and docosahexaenoic acids (DHA, 22: 6n-3), is dependant of the dietary availability of their respective precursors, linoleic (18: 2n-6) and_-linolenic acids (18: 3n-3). Inadequate amounts of DHA in brain membranes have been linked to a wide variety of abnormalities ranging from visual acuity and learning irregularities, to psychopathologies. However, the molecular mechanisms involved ...

  5. Central projections of intrinsically photosensitive retinal ganglion cells in the macaque monkey

    DEFF Research Database (Denmark)

    Hannibal, J; Kankipati, L; Strang, C E

    2014-01-01

    ). The ipRGCs regulate other nonimage-forming visual functions such as the pupillary light reflex, masking behavior, and light-induced melatonin suppression. To evaluate whether PACAP-immunoreactive retinal projections are useful as a marker for central projection of ipRGCs in the monkey brain, we......, supporting previous retrograde tracer studies demonstrating that melanopsin-containing retinal projections reach areas in the primate brain involved in both image- and nonimage-forming visual processing....

  6. A successful effort to involve stakeholders in the selection of a site for a corrective action management unit

    International Nuclear Information System (INIS)

    Conway, R.; Merkhofer, M.W.; Oms, E.

    1995-01-01

    As part of the effort to clean up hazardous waste sites, Sandia National Laboratories in New Mexico (SNL/NM) adopted a novel approach to involving stakeholders in a key decision associated with its Environmental Restoration (ER) Project. The decision was where to locate a Corrective Action Management Unit (CAMU), an area designed to consolidate, store, and treat wastes generated from cleanup activities. The decision-making approach was a variation of a technique known as multiattribute utility analysis (MUA). Although MUA has rarely been undertaken during normal Project activities, it proved to be a surprisingly effective means for involving stakeholders in the decision process, generating consensus over a selected site, and enhancing public trust and understanding of Project activities. Requirements and criteria for selecting CAMU sites are provided by the Environmental Protection Agency's (EPA's) CAMU Final Rule (EPA 1993). Recognizing the lack of experience with the Rule and the importance of community understanding and support, the ER Project sought an approach that would allow stakeholders to participate in the site-selection process

  7. Environmental Impact Assessment Process for Oil, Gas and Mining Projects in Nigeria: A Critical Analysis

    Directory of Open Access Journals (Sweden)

    Allan Ingelson and Chilenye Nwapi

    2014-06-01

    Full Text Available Oil and gas development projects are well known to have damaging environmental effects, and that is especially true in the Niger Delta region. Since the enactment of the Environmental Impact Assessment Act in Nigeria in 1992, there has been a general perception that EIAs are seldom carried out in the region. This article presents a critical analysis of legislation and practice concerning the environmental impact assessment (EIA process for oil and gas projects in Nigeria, the world’s twelfth largest producer of crude oil. It discusses a range of reasons why the impacts of oil and gas projects are not being managed well, despite the legal requirements for EIAs. A review of Nigeria’s environmental governance is presented along with a comprehensive discussion of the EIA process and its significant deficiencies. We argue that the EIA system for oil and gas projects in Nigeria reflects tokenism, resulting in the concentration of benefits of developments in big corporations and government officials. The EIA process in Nigeria faces many challenges that must be addressed in order to improve its effectiveness and alleviate the environmental burdens on this rich oil-producing region.

  8. Stakeholder Salience in ERP Projects

    OpenAIRE

    Salhotra, Eashan

    2014-01-01

    The aim of this study is to examine stakeholder involvement in an Enterprise Resource Planning (ERP) System project that involves implementation and improvement of the implemented system. The study targets stakeholders, their classification, and their degree of importance during different phases of an ERP project life cycle, i.e. planning, implementation, stabilisation and improvement. The study shows that stakeholder involvement and their salience vary along the ERP project life cycle a...

  9. The Hanford Site solid waste treatment project; Waste Receiving and Processing (WRAP) Facility

    International Nuclear Information System (INIS)

    Roberts, R.J.

    1991-01-01

    The Waste Receiving and Processing (WRAP) Facility will provide treatment and temporary storage (consisting of in-process storage) for radioactive and radioactive/hazardous mixed waste. This facility must be constructed and operated in compliance with all appropriate US Department of Energy (DOE) orders and Resource Conservation and Recovery Act (RCRA) regulations. The WRAP Facility will examine and certify, segregate/sort, and treat for disposal suspect transuranic (TRU) wastes in drums and boxes placed in 20-yr retrievable storage since 1970; low-level radioactive mixed waste (RMW) generated and placed into storage at the Hanford Site since 1987; designated remote-handled wastes; and newly generated TRU and RMW wastes from high-level waste (HLW) recovery and processing operations. In order to accelerated the WRAP Project, a partitioning of the facility functions was done in two phases as a means to expedite those parts of the WRAP duties that were well understood and used established technology, while allowing more time to better define the processing functions needed for the remainder of WRAP. The WRAP Module 1 phase one, is to provide the necessary nondestructive examination and nondestructive assay services, as well as all transuranic package transporter (TRUPACT-2) shipping for both WRAP Project phases, with heating, ventilation, and air conditioning; change rooms; and administrative services. Phase two of the project, WRAP Module 2, will provide all necessary waste treatment facilities for disposal of solid wastes. 1 tab

  10. Processing the THOREX waste at the West Valley demonstration project

    International Nuclear Information System (INIS)

    Barnes, S.M.; Schiffhauer, M.A.

    1994-01-01

    This paper focuses on several options for neutralizing the THOREX and combining it with the PUREX wastes. Neutralization testing with simulated wastes (nonradioactive chemicals) was performed to evaluate the neutralization reactions and the reaction product generation. Various methods for neutralizing the THOREX solution were examined to determine their advantages and disadvantages relative to the overall project objectives and compatibility with the existing process. The primary neutralization process selection criteria were safety and minimizing the potential delays prior to vitrification. The THOREX neutralization method selected was direct addition to the high pH PUREX wastes within Tank 8D-2. Laboratory testing with simulated waste has demonstrated rapid neutralization of the THOREX waste acid. Test results for various direct addition scenarios has established the optimum process operating conditions which provide the largest safety margins

  11. Modeling and Simulation of Project Management through the PMBOK® Standard Using Complex Networks

    Directory of Open Access Journals (Sweden)

    Luz Stella Cardona-Meza

    2017-01-01

    Full Text Available Discussion about project management, in both the academic literature and industry, is predominantly based on theories of control, many of which have been developed since the 1950s. However, issues arise when these ideas are applied unilaterally to all types of projects and in all contexts. In complex environments, management problems arise from assuming that results, predicted at the start of a project, can be sufficiently described and delivered as planned. Thus, once a project reaches a critical size, a calendar, and a certain level of ambiguity and interconnection, the analysis centered on control does not function adequately. Projects that involve complex situations can be described as adaptive complex systems, consistent in multiple interdependent dynamic components, multiple feedback processes, nonlinear relations, and management of hard data (process dynamics and soft data (executive team dynamics. In this study, through a complex network, the dynamic structure of a project and its trajectories are simulated using inference processes. Finally, some numerical simulations are described, leading to a decision making tool that identifies critical processes, thereby obtaining better performance outcomes of projects.

  12. High Performance Parallel Processing Project: Industrial computing initiative. Progress reports for fiscal year 1995

    Energy Technology Data Exchange (ETDEWEB)

    Koniges, A.

    1996-02-09

    This project is a package of 11 individual CRADA`s plus hardware. This innovative project established a three-year multi-party collaboration that is significantly accelerating the availability of commercial massively parallel processing computing software technology to U.S. government, academic, and industrial end-users. This report contains individual presentations from nine principal investigators along with overall program information.

  13. THE PROJECT OF ADMINISTRATIVE AND METHODICAL MANAGEMENT AUTOMATIZATION IN EDUCATIONAL INSTITUTION AS A TERM OF EDUCATION PROCESS QUALITY IMPROVEMENT

    Directory of Open Access Journals (Sweden)

    Анна Игоревна Яценко

    2017-12-01

    Full Text Available The article is devoted to the practice of information technologies implementation in the educational process according to the condition of educational informatization. The actuality of main article concept is confirmed by the trend of widespread introduction of information technologies in education both from the state and from business. Taking into account the increased attention to acquiring of high results in the educational process, the information technology tools allows to significantly improve the quality of education. In this regard, the article provides examples of various information systems using in order to administer educational process, their advantages and disadvantages. In consequence, the author formulates the problem of lack of integrated information systems. However, the development of information technologies is oriented towards a worldwide network, which has an access to a vast audience of users. Educational institutions are involved in the electronic process supported by an electronic environment of the educational development. As a result of the issue study above and the modern trends review in the article the author suggests a project description of educational organization management optimization with the help of the integrated information system use on the Internet.

  14. Understanding and Managing Process Interaction in IS Development Projects

    DEFF Research Database (Denmark)

    Bygstad, Bendik; Nielsen, Peter Axel

    2012-01-01

    Software-based information systems must be developed and implemented as a part of business change. This is a major challenge, since business change and the development of software-based information systems usually are performed in separate processes. Thus, there is a need to understand and manage...... critical events in the case, what led to the events, and what the consequences are. We discuss the implications for information systems research and in particular we discuss the contribution to project management of iterative and incremental software development.......Software-based information systems must be developed and implemented as a part of business change. This is a major challenge, since business change and the development of software-based information systems usually are performed in separate processes. Thus, there is a need to understand and manage...

  15. How to Begin a Quality Improvement Project.

    Science.gov (United States)

    Silver, Samuel A; Harel, Ziv; McQuillan, Rory; Weizman, Adam V; Thomas, Alison; Chertow, Glenn M; Nesrallah, Gihad; Bell, Chaim M; Chan, Christopher T

    2016-05-06

    Quality improvement involves a combined effort among health care staff and stakeholders to diagnose and treat problems in the health care system. However, health care professionals often lack training in quality improvement methods, which makes it challenging to participate in improvement efforts. This article familiarizes health care professionals with how to begin a quality improvement project. The initial steps involve forming an improvement team that possesses expertise in the quality of care problem, leadership, and change management. Stakeholder mapping and analysis are useful tools at this stage, and these are reviewed to help identify individuals who might have a vested interest in the project. Physician engagement is a particularly important component of project success, and the knowledge that patients/caregivers can offer as members of a quality improvement team should not be overlooked. After a team is formed, an improvement framework helps to organize the scientific process of system change. Common quality improvement frameworks include Six Sigma, Lean, and the Model for Improvement. These models are contrasted, with a focus on the Model for Improvement, because it is widely used and applicable to a variety of quality of care problems without advanced training. It involves three steps: setting aims to focus improvement, choosing a balanced set of measures to determine if improvement occurs, and testing new ideas to change the current process. These new ideas are evaluated using Plan-Do-Study-Act cycles, where knowledge is gained by testing changes and reflecting on their effect. To show the real world utility of the quality improvement methods discussed, they are applied to a hypothetical quality improvement initiative that aims to promote home dialysis (home hemodialysis and peritoneal dialysis). This provides an example that kidney health care professionals can use to begin their own quality improvement projects. Copyright © 2016 by the American

  16. Power relations and contrasting conceptions of evidence in patient-involvement processes used to inform health funding decisions in Australia.

    Science.gov (United States)

    Lopes, Edilene; Carter, Drew; Street, Jackie

    2015-06-01

    We collected and analysed views of key stakeholders on the processes used to involve patient organisations in health care funding decision making in Australia. We conducted 12 semi-structured interviews with patient organisation representatives and members of Advisory Committees that provide advice to the Australian Department of Health and employ Health Technology Assessment (HTA) as an evaluation framework. Using two theoretical frameworks, we analysed structural and contextual elements pertaining to the involvement processes. The findings reported in this article relate to interviewees' perspectives on contextual elements, analysed using a Foucauldian lens. These elements include: the perspectives of marginalised voices; the diversity of views on what ought to be considered valid evidence in a HTA setting; and the relationships between stakeholders, along with how these relationships impact on involvement processes and the outcomes of those processes. The findings demonstrate that the involvement processes currently used are deemed inadequate by both patient organisation representatives and Advisory Committee members, but for different reasons connected to how different stakeholders conceptualise evidence. Advisory Committee members viewed evidence as encompassing clinical outcomes and patient preferences, whereas patient organisation representatives tended to view evidence as encompassing aspects not directly related to a disease entity, such as the social and emotional aspects of patients' experiences in living with illness. Patient organisation representatives reported interacting with other stakeholders (especially industry) to increase the influence of their conception of evidence on decision making. The use of this strategy by interviewees illustrates how power struggles occur in government decision-making processes which involve both medical expertise and patients' accounts. Such struggles, and the power differentials they reflect, need to be considered

  17. Facilitating Work Based Learning Projects: A Business Process Oriented Knowledge Management Approach

    NARCIS (Netherlands)

    Miao, Yongwu; Sloep, Peter; Koper, Rob

    2009-01-01

    Miao, Y., Sloep, P. B., & Koper, R. (2009). Facilitating Work Based Learning Projects: A Business Process Oriented Knowledge Management Approach. Presented at the 'Open workshop of TENCompetence - Rethinking Learning and Employment at a Time of Economic Uncertainty-event'. November, 19, 2009,

  18. Parental Involvement and Academic Achievement

    Science.gov (United States)

    Goodwin, Sarah Christine

    2015-01-01

    This research study examined the correlation between student achievement and parent's perceptions of their involvement in their child's schooling. Parent participants completed the Parent Involvement Project Parent Questionnaire. Results slightly indicated parents of students with higher level of achievement perceived less demand or invitations…

  19. Correlations in photon-numbers and integrated intensities in parametric processes involving three optical fields

    Czech Academy of Sciences Publication Activity Database

    Peřina, Jan; Křepelka, Jaromír; Peřina ml., Jan; Bondani, M.; Allevi, A.; Andreoni, A.

    2009-01-01

    Roč. 53, č. 3 (2009), 373-382 ISSN 1434-6060 R&D Projects: GA AV ČR KAN301370701; GA MŠk(CZ) 1M06002 Institutional research plan: CEZ:AV0Z10100522 Keywords : parametric process * three-mode state * sub-Poisson statistics * conditional measurement Subject RIV: BH - Optics, Masers, Lasers Impact factor: 1.420, year: 2009

  20. Softwareland Chronicles: A Software Development Meta-Process Proposal

    Directory of Open Access Journals (Sweden)

    Bolanos Sandro

    2016-05-01

    Full Text Available This paper presents the software development meta-process (SD-MP as a proposal to set up software projects. Within this proposal we offer conceptual elements that help solve the war of methodologies and processes in favor of an integrating viewpoint, where the main flaws associated with conventional and agile approaches are removed. Our newly developed software platform to support the meta-process is also presented together with three case studies involving projects currently in progress, where the framework proposed in SD-MP has been applied.

  1. 19th International Congress on Project Management and Engineering

    CERN Document Server

    Blanco, José; Capuz-Rizo, Salvador

    2017-01-01

    This book gathers the best papers presented at the 19th International Congress on Project Management and Engineering, which was held in Granada, Spain in July 2015. It covers a range of project management and engineering contexts, including: civil engineering and urban planning, product and process engineering, environmental engineering, energy efficiency and renewable energies, rural development, information and communication technologies, safety, labour risks and ergonomics, and training in project engineering. Project management and engineering is taking on increasing importance as projects continue to grow in size, more stakeholders become involved, and environmental, organisational and technological issues become more complex. As such, this book offers a valuable resource for all professionals seeking the latest material on the changing face of project management.

  2. APP processing and the APP-KPI domain involvement in the amyloid cascade.

    Science.gov (United States)

    Menéndez-González, M; Pérez-Pinera, P; Martínez-Rivera, M; Calatayud, M T; Blázquez Menes, B

    2005-01-01

    Alternative APP mRNA splicing can generate isoforms of APP containing a Kunitz protease inhibitor (KPI) domain. KPI is one of the main serine protease inhibitors. Protein and mRNA KPI(+)APP levels are elevated in Alzheimer's disease (AD) brain and are associated with increased amyloid beta deposition. In the last years increasing evidence on multiple points in the amyloid cascade where KPI(+)APP is involved has been accumulated, admitting an outstanding position in the pathogenesis of AD to the KPI domain. This review focuses on the APP processing, the molecular activity of KPI and its physiological and pathological roles and the KPI involvement in the amyloid cascade through the nerve growth factor, the lipoprotein receptor-related protein, the tumor necrosis factor-alpha converting enzyme and the Notch1 protein.

  3. State write-ups on EERE funded projects

    Energy Technology Data Exchange (ETDEWEB)

    Hurwitch, J.; Klareich, F.; Surek, D.

    1997-03-04

    Short summaries are presented on 43 projects funded under the hydrogen program in FY 1997 in California, Colorado, Connecticut, the District of Columbia, Florida, Hawaii, Maryland, Massachusetts, Michigan, New Jersey, New Mexico, New York, Oklahoma, Pennsylvania, South Carolina, Tennessee, and Virginia. The studies involve hydrogen production processes, hydrogen storage and delivery systems, environmental impacts, hydrogen fuel cells, information dissemination, marketing research, separation processes, transportation safety, materials corrosion and stability, hydrogen recovery at refineries, and infrastructure planning.

  4. Integrating fuel treatment into ecosystem management: A proposed project planning process

    Science.gov (United States)

    Keith D. Stockmann; Kevin D. Hyde; J. Greg Jones; Dan R. Loeffler; Robin P. Silverstein

    2010-01-01

    Concern over increased wildland fire threats on public lands throughout the western United States makes fuel reduction activities the primary driver of many management projects. This single-issue focus recalls a management planning process practiced frequently in recent decades - a least-harm approach where the primary objective is first addressed and then plans are...

  5. TRAINING DURING ISO 9001 IMPLEMENTATION AND WORKERS INVOLVEMENT INTO THE QUALITY MANAGEMENT PROCESS IN MONTENEGRO

    Directory of Open Access Journals (Sweden)

    Marc-Arthur Diaye

    2009-03-01

    Full Text Available According to several researchers, workers involvement into the implementation of a quality system in a firm is a key of its success. Since training can improve workers involvement during the implementation of a quality system in a firm, we try in this paper to evaluate quantitatively in the case of Montenegro, the impact of training of workers' involvement. Using an original data set about two leading firms from Montenegro, we show that the coefficient associated with the training variable is on average about -1.44 and is significant at a level of 1%. That is workers who are not trained during the ISO 9001 implementation are strongly less involved into the quality management process of their firms.

  6. Adolescent fathers: knowledge of and involvement in the breast feeding process in Brazil.

    Science.gov (United States)

    Torres de Lacerda, Ana Catarina; Lucena de Vasconcelos, Maria Gorete; Nascimento de Alencar, Eloine; Osório, Mônica Maria; Pontes, Cleide Maria

    2014-03-01

    to understand the ways in which adolescent fathers participate in the breast feeding process in the family environment in North-eastern Brazil. a descriptive, exploratory, qualitative study was undertaken involving 10 couples with infants aged 6-8 months living in a single community in Recife, Pernambuco, Brazil. Data were collected using semi-structured interviews with questions to guide the interviewer. Data were analysed using thematic content analysis, and interpreted under the theoretical reference of being an adolescent father within the context of breast feeding. from the data collected, three themes were identified: knowledge of the benefits of breast feeding for the child's health; discontinued participation of the father in breast feeding during the pregnancy-childbearing cycle; and exclusion of the adolescent father from the breast feeding process. The adolescent fathers knew about the benefits of breast feeding in terms of the child's health, but did not mention benefits for the mother, the family or society. For some adolescent fathers, their participation in the breast feeding process started during pregnancy, whereas for others, it was only initiated after the infant was born. One of the fathers was prevented, by his wife and mother-in-law, from participating in the breast feeding process. the involvement of adolescent fathers in the breast feeding process oscillated during the pregnancy-childbearing cycle. This may be due to the patriarchal cultural heritage, Brazilian paternity laws, and the fact that these fathers were adolescents. This study showed that adolescent parents were knowledgeable about breast feeding. Finally, fathers want a new model of parenting in which the man participates in child care. Crown Copyright © 2013. Published by Elsevier Ltd. All rights reserved.

  7. Stakeholder involvement in Swedish nuclear waste management

    International Nuclear Information System (INIS)

    Elam, Mark; Sundqvist, Goeran

    2006-09-01

    This report concerning Swedish nuclear waste management has been produced as part of a cross national research project: CARL - A Social Science Research Project into the Effects of Stakeholder involvement on Decision-Making in Radioactive Waste Management. Besides Sweden, the participating countries are Belgium, Canada, Finland, Slovenia and United Kingdom. A social science research team, working for three years, is in the first phase conducting research in their own countries in order to produce 6 country reports. During the next years the focus will shift to comparisons of stakeholder involvement practices in the participating countries. The report addresses current practices of Swedish nuclear waste management and their historical development. The main focus is on past, current and emerging patterns of stakeholder involvement in the siting of a deep repository for the final disposal of Sweden's spent nuclear fuel. The general questions attended to in the report are: Who are the main stakeholders, and how have they emerged and gained recognition as such? What are the issues currently subject to stakeholder involvement and how have these been decided upon? How is stakeholder involvement organized locally and nationally and how has this changed over time? How has stakeholder involvement gained acceptance as an activity of value in the siting of major waste facilities? The report have attempted to show the development of stakeholder involvement in the siting of a final repository for Sweden's spent nuclear fuel as resembling something other than a straightforward linear process of improvement and refinement. Stakeholder involvement has developed, over the past 15 years or so, into something more like a patchwork of different shapes and forms. Some of the forces that may well contribute to the further elaboration of the patchwork of stakeholder involvement have been pointed out, contingently modifying once more its overall colour and orientation. Questions have been

  8. Stakeholder involvement in Swedish nuclear waste management

    Energy Technology Data Exchange (ETDEWEB)

    Elam, Mark; Sundqvist, Goeran [Goeteborg Univ. (Sweden). Section for Science and Technology Studies

    2006-09-15

    This report concerning Swedish nuclear waste management has been produced as part of a cross national research project: CARL - A Social Science Research Project into the Effects of Stakeholder involvement on Decision-Making in Radioactive Waste Management. Besides Sweden, the participating countries are Belgium, Canada, Finland, Slovenia and United Kingdom. A social science research team, working for three years, is in the first phase conducting research in their own countries in order to produce 6 country reports. During the next years the focus will shift to comparisons of stakeholder involvement practices in the participating countries. The report addresses current practices of Swedish nuclear waste management and their historical development. The main focus is on past, current and emerging patterns of stakeholder involvement in the siting of a deep repository for the final disposal of Sweden's spent nuclear fuel. The general questions attended to in the report are: Who are the main stakeholders, and how have they emerged and gained recognition as such? What are the issues currently subject to stakeholder involvement and how have these been decided upon? How is stakeholder involvement organized locally and nationally and how has this changed over time? How has stakeholder involvement gained acceptance as an activity of value in the siting of major waste facilities? The report have attempted to show the development of stakeholder involvement in the siting of a final repository for Sweden's spent nuclear fuel as resembling something other than a straightforward linear process of improvement and refinement. Stakeholder involvement has developed, over the past 15 years or so, into something more like a patchwork of different shapes and forms. Some of the forces that may well contribute to the further elaboration of the patchwork of stakeholder involvement have been pointed out, contingently modifying once more its overall colour and orientation. Questions

  9. Motor cortical processing is causally involved in object recognition

    Science.gov (United States)

    2013-01-01

    Background Motor activity during vicarious experience of actions is a widely reported and studied phenomenon, and motor system activity also accompanies observation of graspable objects in the absence of any actions. Such motor activity is thought to reflect simulation of the observed action, or preparation to interact with the object, respectively. Results Here, in an initial exploratory study, we ask whether motor activity during observation of object directed actions is involved in processes related to recognition of the object after initial exposure. Single pulse Transcranial Magnetic Stimulation (TMS) was applied over the thumb representation of the motor cortex, or over the vertex, during observation of a model thumb typing on a cell-phone, and performance on a phone recognition task at the end of the trial was assessed. Disrupting motor processing over the thumb representation 100 ms after the onset of the typing video impaired the ability to recognize the phone in the recognition test, whereas there was no such effect for TMS applied over the vertex and no TMS trials. Furthermore, this effect only manifested for videos observed from the first person perspective. In an additional control condition, there was no evidence for any effects of TMS to the thumb representation or vertex when observing and recognizing non-action related shape stimuli. Conclusion Overall, these data provide evidence that motor cortical processing during observation of object-directed actions from a first person perspective is causally linked to the formation of enduring representations of objects-of-action. PMID:24330638

  10. Improving Construction Process through Integration and Concurrent Engineering

    Directory of Open Access Journals (Sweden)

    Malik Khalfan

    2012-11-01

    Full Text Available In an increasingly competitive business environment, improvedtime-to-market, reduced production cost, quality of the productand customer involvement are rapidly becoming the key successfactors for any product development process. Consequently, mostorganisations are moving towards the adoption of latest technologyand new management concepts and philosophies such as totalquality management and concurrent engineering (CE to bringimprovement in their product development process. This paperdiscusses the adoption of integrated processes and CE withinthe construction industry to enable construction organisations toimprove their project development process. It also discusses aproposed integrated database model for the construction projects,which should enable the construction process to improve, becomemore effective and more efficient.

  11. Understanding lean & safety projects: analysis of case studies

    Directory of Open Access Journals (Sweden)

    Maria Crema

    2017-12-01

    Full Text Available Facing the current socio-economic contingency while guaranteeing a high level of care quality is particularly challenging in the field of healthcare. Through an integrated adoption of emerging managerial solutions, projects that allow organizations to achieve both efficiency and patient safety improvements could be implemented, thereby transposing policy directives towards a safer and more sustainable healthcare system. Therefore, the purpose of this paper is to investigate the features of Lean & Safety (L&S projects. Three Health Lean Management (HLM projects that had unexpected patient safety results were selected from the same region. Differences and similarities among the cases have been highlighted and interesting points of evidence have been noted. Despite the fact that the projects were pursuing similar objectives and benefiting from comparable support, the obtained changes had direct impact on patient safety enhancement in the cases that involved the front-office processes, and an indirect impact on patient safely for the L&S project that focused on back-office activities. The implementation processes and the Information and Communication Technologies (ICT adoption of the cases are also different.

  12. Facilitating Work Based Learning Projects: A Business Process Oriented Knowledge Management Approach

    NARCIS (Netherlands)

    Miao, Yongwu; Sloep, Peter; Koper, Rob

    2009-01-01

    Miao, Y., Sloep, P. B., & Koper, R. (2010). Facilitating Work Based Learning Projects: A Business Process Oriented Knowledge Management Approach. In D. Griffiths & R. Koper (Eds.), Rethinking Learning and Employment at a Time of Economic Uncertainty. Proceedings of the 6th TENCompetence Open

  13. New process modeling[sic], design, and control strategies for energy efficiency, high product quality, and improved productivity in the process industries. Final project report; FINAL

    International Nuclear Information System (INIS)

    Ray, W. Harmon

    2002-01-01

    This project was concerned with the development of process design and control strategies for improving energy efficiency, product quality, and productivity in the process industries. In particular, (i) the resilient design and control of chemical reactors, and (ii) the operation of complex processing systems, was investigated. Specific topics studied included new process modeling procedures, nonlinear controller designs, and control strategies for multiunit integrated processes. Both fundamental and immediately applicable results were obtained. The new design and operation results from this project were incorporated into computer-aided design software and disseminated to industry. The principles and design procedures have found their way into industrial practice

  14. Incorporating risk in the economic evaluation of road infrastructure projects

    CSIR Research Space (South Africa)

    Schutte, IC

    2009-05-26

    Full Text Available credibility to the process and ensure strategic decisions that are more defendable. In this study, a prosedure for incorporating risk is suggested. It involves the identification of inputs critical to the economic success of the project, the quantification...

  15. SEISMIC DESIGN REQUIREMENTS SELECTION METHODOLOGY FOR THE SLUDGE TREATMENT and M-91 SOLID WASTE PROCESSING FACILITIES PROJECTS

    International Nuclear Information System (INIS)

    RYAN GW

    2008-01-01

    In complying with direction from the U.S. Department of Energy (DOE), Richland Operations Office (RL) (07-KBC-0055, 'Direction Associated with Implementation of DOE-STD-1189 for the Sludge Treatment Project,' and 08-SED-0063, 'RL Action on the Safety Design Strategy (SDS) for Obtaining Additional Solid Waste Processing Capabilities (M-91 Project) and Use of Draft DOE-STD-I 189-YR'), it has been determined that the seismic design requirements currently in the Project Hanford Management Contract (PHMC) will be modified by DOE-STD-1189, Integration of Safety into the Design Process (March 2007 draft), for these two key PHMC projects. Seismic design requirements for other PHMC facilities and projects will remain unchanged. Considering the current early Critical Decision (CD) phases of both the Sludge Treatment Project (STP) and the Solid Waste Processing Facilities (M-91) Project and a strong intent to avoid potentially costly re-work of both engineering and nuclear safety analyses, this document describes how Fluor Hanford, Inc. (FH) will maintain compliance with the PHMC by considering both the current seismic standards referenced by DOE 0 420.1 B, Facility Safety, and draft DOE-STD-1189 (i.e., ASCE/SEI 43-05, Seismic Design Criteria for Structures, Systems, and Components in Nuclear Facilities, and ANSI ANS 2.26-2004, Categorization of Nuclear Facility Structures, Systems and Components for Seismic Design, as modified by draft DOE-STD-1189) to choose the criteria that will result in the most conservative seismic design categorization and engineering design. Following the process described in this document will result in a conservative seismic design categorization and design products. This approach is expected to resolve discrepancies between the existing and new requirements and reduce the risk that project designs and analyses will require revision when the draft DOE-STD-1189 is finalized

  16. Sulphur removal in IGCC projects

    Energy Technology Data Exchange (ETDEWEB)

    Cross, F. (Parsons (United Kingdom))

    1998-01-01

    The technology for recovering elemental sulphur from H[sub 2]S bearing gases is well established. The modified Claus Process is the principal work-horse in sulphur recovery and can customarily achieve conversion efficiencies of 95% or better. Nowadays, such a level of recovery is no longer sufficient in most instances and sulphur recovery facility must then include some form of enhanced recovery, usually by treating the Claus tail gas. A number of processes have been introduced to enable the overall recovery to be increased. Recoveries in excess of 99% are both feasible and economic. Use of oxygen in place has become very popular in cases where oxygen is available cheaply or where capacity increases are designed. Most IGCC projects needing an air separation plant would automatically benefit from extending the use of oxygen to the sulphur recovery plant. The most popular route to minimising sulphur emissions in the context of IGCC projects has involved an oxygen based Claus plant followed by tail gas hydrogenation, hydrogen sulphide recovery and its recycle to the Claus section. The recovery of H[sub 2]S from the Claus tail gas can be integrated with the main gas treating system in the gasification plant. The cost advantage of doing so is significant. Parsons has been involved with the technology since 1949 and has been responsible for developments such as the ammonia burning Claus and jointly with Unocal, the BSRP tail gas process and Selectox processes. Recent innovations in response changing environmental and production requirements have included catalytic and tail gas processes which reduce sulphur emissions. 6 figs., 2 tabs.

  17. Sulphur removal in IGCC projects

    Energy Technology Data Exchange (ETDEWEB)

    Cross, F. [Parsons (United Kingdom)

    1998-12-31

    The technology for recovering elemental sulphur from H{sub 2}S bearing gases is well established. The modified Claus Process is the principal work-horse in sulphur recovery and can customarily achieve conversion efficiencies of 95% or better. Nowadays, such a level of recovery is no longer sufficient in most instances and sulphur recovery facility must then include some form of enhanced recovery, usually by treating the Claus tail gas. A number of processes have been introduced to enable the overall recovery to be increased. Recoveries in excess of 99% are both feasible and economic. Use of oxygen in place has become very popular in cases where oxygen is available cheaply or where capacity increases are designed. Most IGCC projects needing an air separation plant would automatically benefit from extending the use of oxygen to the sulphur recovery plant. The most popular route to minimising sulphur emissions in the context of IGCC projects has involved an oxygen based Claus plant followed by tail gas hydrogenation, hydrogen sulphide recovery and its recycle to the Claus section. The recovery of H{sub 2}S from the Claus tail gas can be integrated with the main gas treating system in the gasification plant. The cost advantage of doing so is significant. Parsons has been involved with the technology since 1949 and has been responsible for developments such as the ammonia burning Claus and jointly with Unocal, the BSRP tail gas process and Selectox processes. Recent innovations in response changing environmental and production requirements have included catalytic and tail gas processes which reduce sulphur emissions. 6 figs., 2 tabs.

  18. DEVELOPMENT OF SCIENCE PROCESS SKILLS STUDENTS WITH PROJECT BASED LEARNING MODEL- BASED TRAINING IN LEARNING PHYSICS

    Directory of Open Access Journals (Sweden)

    Ratna Malawati

    2016-06-01

    Full Text Available This study aims to improve the physics Science Process Skills Students on cognitive and psychomotor aspects by using model based Project Based Learning training.The object of this study is the Project Based Learning model used in the learning process of Computationa Physics.The method used is classroom action research through two learning cycles, each cycle consisting of the stages of planning, implementation, observation and reflection. In the first cycle of treatment with their emphasis given training in the first phase up to third in the model Project Based Learning, while the second cycle is given additional treatment with emphasis discussion is collaboration in achieving the best results for each group of products. The results of data analysis showed increased ability to think Students on cognitive and Science Process Skills in the psychomotor.

  19. How is success or failure in river restoration projects evaluated? Feedback from French restoration projects.

    Science.gov (United States)

    Morandi, Bertrand; Piégay, Hervé; Lamouroux, Nicolas; Vaudor, Lise

    2014-05-01

    Since the 1990s, French operational managers and scientists have been involved in the environmental restoration of rivers. The European Water Framework Directive (2000) highlights the need for feedback from restoration projects and for evidence-based evaluation of success. Based on 44 French pilot projects that included such an evaluation, the present study includes: 1) an introduction to restoration projects based on their general characteristics 2) a description of evaluation strategies and authorities in charge of their implementation, and 3) a focus on the evaluation of results and the links between these results and evaluation strategies. The results show that: 1) the quality of an evaluation strategy often remains too poor to understand well the link between a restoration project and ecological changes; 2) in many cases, the conclusions drawn are contradictory, making it difficult to determine the success or failure of a restoration project; and 3) the projects with the poorest evaluation strategies generally have the most positive conclusions about the effects of restoration. Recommendations are that evaluation strategies should be designed early in the project planning process and be based on clearly-defined objectives. Copyright © 2014 Elsevier Ltd. All rights reserved.

  20. Bilateral descending hypothalamic projections to the spinal trigeminal nucleus caudalis in rats.

    Directory of Open Access Journals (Sweden)

    Khaled Abdallah

    Full Text Available Several lines of evidence suggest that the hypothalamus is involved in trigeminal pain processing. However, the organization of descending hypothalamic projections to the spinal trigeminal nucleus caudalis (Sp5C remains poorly understood. Microinjections of the retrograde tracer, fluorogold (FG, into the Sp5C, in rats, reveal that five hypothalamic nuclei project to the Sp5C: the paraventricular nucleus, the lateral hypothalamic area, the perifornical hypothalamic area, the A11 nucleus and the retrochiasmatic area. Descending hypothalamic projections to the Sp5C are bilateral, except those from the paraventricular nucleus which exhibit a clear ipsilateral predominance. Moreover, the density of retrogradely FG-labeled neurons in the hypothalamus varies according to the dorso-ventral localization of the Sp5C injection site. There are much more labeled neurons after injections into the ventrolateral part of the Sp5C (where ophthalmic afferents project than after injections into its dorsomedial or intermediate parts (where mandibular and maxillary afferents, respectively, project. These results demonstrate that the organization of descending hypothalamic projections to the spinal dorsal horn and Sp5C are different. Whereas the former are ipsilateral, the latter are bilateral. Moreover, hypothalamic projections to the Sp5C display somatotopy, suggesting that these projections are preferentially involved in the processing of meningeal and cutaneous inputs from the ophthalmic branch of the trigeminal nerve in rats. Therefore, our results suggest that the control of trigeminal and spinal dorsal horn processing of nociceptive information by hypothalamic neurons is different and raise the question of the role of bilateral, rather than unilateral, hypothalamic control.

  1. A competency framework for librarians involved in systematic reviews.

    Science.gov (United States)

    Townsend, Whitney A; Anderson, Patricia F; Ginier, Emily C; MacEachern, Mark P; Saylor, Kate M; Shipman, Barbara L; Smith, Judith E

    2017-07-01

    The project identified a set of core competencies for librarians who are involved in systematic reviews. A team of seven informationists with broad systematic review experience examined existing systematic review standards, conducted a literature search, and used their own expertise to identify core competencies and skills that are necessary to undertake various roles in systematic review projects. The team identified a total of six competencies for librarian involvement in systematic reviews: "Systematic review foundations," "Process management and communication," "Research methodology," "Comprehensive searching," "Data management," and "Reporting." Within each competency are the associated skills and knowledge pieces (indicators). Competence can be measured using an adaptation of Miller's Pyramid for Clinical Assessment, either through self-assessment or identification of formal assessment instruments. The Systematic Review Competencies Framework provides a standards-based, flexible way for librarians and organizations to identify areas of competence and areas in need of development to build capacity for systematic review integration. The framework can be used to identify or develop appropriate assessment tools and to target skill development opportunities.

  2. Multi-site risk-based project planning, optimization, sequencing and budgeting process and tool for the integrated facility disposition project - 59394

    International Nuclear Information System (INIS)

    Nelson, Jerel; Castillo, Carlos; Huntsman, Julie; Lucek, Heather; Marks, Tim

    2012-01-01

    Document available in abstract form only. Full text of publication follows: Faced with the DOE Complex Transformation, NNSA was tasked with developing an integrated plan for the decommissioning of over 400 facilities and 300 environmental remediation units, as well as the many reconfiguration and modernization projects at the Oak Ridge National Laboratory (ORNL) and Y-12 Complex. Manual scheduling of remediation activities is time-consuming, labor intensive, and inherently introduces bias and unaccounted for aspects of the scheduler or organization in the process. Clearly a tool was needed to develop an objective, unbiased baseline optimized project sequence and schedule with a sound technical foundation for the Integrated Facility Disposition Project (IFDP). In generating an integrated disposition schedule, each project (including facilities, environmental sites, and remedial action units) was identified, characterized, then ranked relative to other projects. Risk matrices allowed for core project data to be extrapolated into probable contamination levels, relative risks to the public, and other technical and risk parameters to be used in the development of an overall ranking. These matrices ultimately generated a complete data set that were used in the Ranking and Sequencing Model (RSM), commonly referred to as the SUPER model, for its numerous abilities to support D and D planning, prioritization, and sequencing

  3. Perceptions of legally mandated public involvement processes in the U.S. Forest Service

    Science.gov (United States)

    S. Andrew Predmore; Marc J. Stern; Michael J. Mortimer; David N. Seesholtz

    2011-01-01

    Results from an agency-wide survey of U.S. Forest Service personnel indicate that respondents in our sample engage in National Environmental Policy Act (NEPA) public involvement processes primarily to accomplish two goals. The most commonly supported goal was to inform and disclose as mandated by the act. The other goal reflected interests in managing agency...

  4. Projection-based curve clustering

    International Nuclear Information System (INIS)

    Auder, Benjamin; Fischer, Aurelie

    2012-01-01

    This paper focuses on unsupervised curve classification in the context of nuclear industry. At the Commissariat a l'Energie Atomique (CEA), Cadarache (France), the thermal-hydraulic computer code CATHARE is used to study the reliability of reactor vessels. The code inputs are physical parameters and the outputs are time evolution curves of a few other physical quantities. As the CATHARE code is quite complex and CPU time-consuming, it has to be approximated by a regression model. This regression process involves a clustering step. In the present paper, the CATHARE output curves are clustered using a k-means scheme, with a projection onto a lower dimensional space. We study the properties of the empirically optimal cluster centres found by the clustering method based on projections, compared with the 'true' ones. The choice of the projection basis is discussed, and an algorithm is implemented to select the best projection basis among a library of orthonormal bases. The approach is illustrated on a simulated example and then applied to the industrial problem. (authors)

  5. Cellular processes involved in human epidermal cells exposed to extremely low frequency electric fields.

    Science.gov (United States)

    Collard, J-F; Hinsenkamp, M

    2015-05-01

    We observed on different tissues and organisms a biological response after exposure to pulsed low frequency and low amplitude electric or electromagnetic fields but the precise mechanism of cell response remains unknown. The aim of this publication is to understand, using bioinformatics, the biological relevance of processes involved in the modification of gene expression. The list of genes analyzed was obtained after microarray protocol realized on cultures of human epidermal explants growing on deepidermized human skin exposed to a pulsed low frequency electric field. The directed acyclic graph on a WebGestalt Gene Ontology module shows six categories under the biological process root: "biological regulation", "cellular process", "cell proliferation", "death", "metabolic process" and "response to stimulus". Enriched derived categories are coherent with the type of in vitro culture, the stimulation protocol or with the previous results showing a decrease of cell proliferation and an increase of differentiation. The Kegg module on WebGestalt has highlighted "cell cycle" and "p53 signaling pathway" as significantly involved. The Kegg website brings out interactions between FoxO, MAPK, JNK, p53, p38, PI3K/Akt, Wnt, mTor or NF-KappaB. Some genes expressed by the stimulation are known to have an exclusive function on these pathways. Analyses performed with Pathway Studio linked cell proliferation, cell differentiation, apoptosis, cell cycle, mitosis, cell death etc. with our microarrays results. Medline citation generated by the software and the fold change variation confirms a diminution of the proliferation, activation of the differentiation and a less well-defined role of apoptosis or wound healing. Wnt and DKK functional classes, DKK1, MACF1, ATF3, MME, TXNRD1, and BMP-2 genes proposed in previous publications after a manual analysis are also highlighted with other genes after Pathway Studio automatic procedure. Finally, an analysis conducted on a list of genes

  6. Essential Skills for Project Stakeholders Identification: Sustainability Perspective

    Directory of Open Access Journals (Sweden)

    Md. Mashiur Rahman

    2017-09-01

    Full Text Available In every life cycle of the project there are numerous people or organizations involved either directly or indirectly. While these type of people and organizations involved are called stakeholders and these may include the project team, client or customer, community, environment, suppliers, government. Stakeholders contribute and share their experiences, knowledge, and insights to support the project throughout its life cycle and therefore it is crucial to capture their input. However, before initiation of the project, stakeholders need to be identified. Following the fact that there are strategies and processes for stakeholder identification, it is not clear what skills are needed to employ those strategies for stakeholder identification. These skills are exceedingly important to have because in today's corporate world, the project team must be flexible in every aspect of their job and be able to complement their skills for the success of stakeholder identification. Using literature review, this paper seeks to describe the skills of project leader needed to identify the project team and the external stakeholders. Inductive approach was followed in this study and data was collected qualitatively using secondary sources. There are two essential skills i.e. relationship building skills and communication skills for internal stakeholders and four major skills i.e. communication skills, people skills, intellectual skills and conceptual skills for external stakeholders are identified for the identification of project stakeholders through literature review considering the sustainability issues in the project management.

  7. Conscientious Consumerism Project in an Undergraduate Quality Management Class

    Science.gov (United States)

    Helms, Marilyn M.

    2014-01-01

    This article describes a "conscientious consumerism" project that involves the student as the consumer to either commend or complain to a company about a recent product or service experience. This activity and presentation helps students develop an understanding of the commendation/complaint management process within organizations while…

  8. Sustainable energy for cashew production chain using innovative clean technology project developments

    Energy Technology Data Exchange (ETDEWEB)

    Pannir Selvam, P.V.; Nandenha, Julio; Santiago, Brunno Henrique de Souza; Silva, Rosalia Tatiane da [Universidade Federal do Rio Grande do Norte (GPEC/DEQ/UFRN), Lagoa Nova, RN (Brazil). Dept. de Engenharia Quimica. Grupo de Pesquisa em Engenharia de Custos e Processos], e-mail: pannirbr@gmail.com

    2006-07-01

    The main objective is to develop a new process synthesis based on the residual biomass waste for the energy production applied to the fruit processing plant with co-production of hot, cold thermal energy using biogas from the wood biomass and animal wastes. After carried out the bibliographical research about the current state of art technology, an engineering project had been developed with the use of the software Super Pro Designer V 4.9. Some simulations of processes of the fast pyrolysis, gasification, bio digestion, generation of energy have been realized including the system integration of energy production as innovation of the present work. Three cases study have been developed: first, the current process of conventional energy using combustion, another one using combined pyrolysis and gasification, and the last one with bio digestion for combined power, heat and chilling. The results about the project investment and the cost analysis, economic viability and cash balance were obtained using software Orc 2004. Several techno-economic parameters of the selected cases study involving process innovation were obtained and compared, where a better energy and materials utilization were observed in relation to conventional process. This project which is still in development phase, involves small scale energy integrated system design. The energy and the process integration cashew fruit production chain, based on the clean technology process design, has enable significant improvement in terms of economic and environmental using optimal system configurations with viability and sustainability. (author)

  9. Aligning BIM with FM: streamlining the process for future projects

    Directory of Open Access Journals (Sweden)

    Colleen Kasprzak

    2012-12-01

    Full Text Available A study performed by the National Institute of Standards and Technology (NIST, USA in 2004 found that owners account for approximately $10.6 billion of the $15.8 billion total inadequate interoperability costs of U.S. capital facility projects in 2002. Because of these inefficiency costs, it becomes vital that information produced during the design and construction phases of a project be transferred into operations with maximum leverage to the end users. However, very few owners have defined these informational needs or developed an integration strategy into existing maintenance management systems. To increase operational efficiency, an organization must first develop an understanding of their operating systems, as well as identify how Building Information Modeling (BIM will add value to their daily tasks. The Pennsylvania State University (PSU has a unique opportunity to diversely implement BIM processes because not only does the University act as an owner, but also as designer and construction manager on the majority of projects. The struggle that PSU faces is one that is unique only to owners with a large, existing, multifaceted building inventory. This paper outlines the current initiative by the Office of Physical Plant (OPP, the asset manager at PSU, to develop an information exchange framework between BIM and FM applications to be used internally. As a result of this research, PSU has been able to define owner operational requirements for future projects and develop a flexible integration framework to support additional BIM tasks and information exchanges.

  10. Social learning in transnational projects – lessons from European territorial cooperation projects

    Directory of Open Access Journals (Sweden)

    Joern Harfst

    2015-04-01

    Full Text Available Old industrial regions in Europe have undergone radical changes in the last decades. After downsizing or closure of predominant industries such regions usually face big challenges concerning their economic, social and ecological futures. One chance to master this transformation process is the identification and sustainable utilisation of potentials left by industrial production. Utilisation of regional potentials, commonly categorized as natural and cultural potentials, was the aim of two transnational cooperation projects ReSource and SHIFT-X, which were both funded by European Union’s Development Fund (ERDF, INTERREG IVB. The paper shows how the involvement of research partners in the projects supported and facilitated joint learning effects and knowledge transfer between all project partners. It is argued that on the one hand such an approach offers important mutual benefits for partners, while on the other hand the realisation of such benefits remains a challenging task in a transnational collaboration. In declining industrial regions, especially when characterised by small- and medium-sized towns, the capacities to act are scarce and any outside intervention is often seen more as an unwanted factor that additionally stretches resources and provides little advantages for such regions. Therefore one of the main aims in transnational collaboration has to be the establishment of a trustful and committed working relation between all partners. The engagement in the projects has shown that the joint work between regional actors and the external academic partners can create important transnational learning effects for all involved; nevertheless it has to overcome certain reservations on all sides before innovative ways can be pursued successfully.

  11. Compilation Of An Econometric Human Resource Efficiency Model For Project Management Best Practices

    Directory of Open Access Journals (Sweden)

    G. van Zyl

    2006-11-01

    Full Text Available The aim of the paper is to introduce a human resource efficiency model in order to rank the most important human resource driving forces for project management best practices. The results of the model will demonstrate how the human resource component of project management acts as the primary function to enhance organizational performance, codified through improved logical end-state programmes, work ethics and process contributions. Given the hypothesis that project management best practices involve significant human resource and organizational changes, one would reasonably expect this process to influence and resonate throughout all the dimensions of an organisation.

  12. Studies of some phenomena in control engineering projects - With application to precipitation processes

    Energy Technology Data Exchange (ETDEWEB)

    Stoele-Hansen, Kjell

    1998-12-31

    This thesis deals with the life-cycle of a control engineering project and some phenomena encountered in such projects. Different types of control strategies are discussed and an attempt is made to classify them into categories. Some case projects are presented and forms the basis for discussing the individual`s role in a change project. Further conditions for successful implementation of new control strategies are discussed in general, but also conditions for successful implementation of new control strategies at a process section of a nickel work. Procedures for implementing new control strategies are treated and some remarks are made about operation of control strategies. An introduction is given to the modelling of precipitation in pH systems and different model formulations are discused. The modelling of pH controlled precipitations is discussed in general. A variety of dynamic models, ranging from complex to simple, are proposed and discussed. A rigorous dynamic nonlinear mechanistic model of a precipitation reactor is developed. It is based on the theory of reaction invariants and variants. The model is verified against real process data. The dynamics and characteristics of the precipitation reactor are analysed and some remarks are made with respect to controllability. A new strategy for pH control is proposed. A new model based strategy for controlling the precipitation reactions is also proposed. 93 refs., 63 figs., 10 tabs.

  13. Augmenting SCA project management and automation framework

    Science.gov (United States)

    Iyapparaja, M.; Sharma, Bhanupriya

    2017-11-01

    In our daily life we need to keep the records of the things in order to manage it in more efficient and proper way. Our Company manufactures semiconductor chips and sale it to the buyer. Sometimes it manufactures the entire product and sometimes partially and sometimes it sales the intermediary product obtained during manufacturing, so for the better management of the entire process there is a need to keep the track record of all the entity involved in it. Materials and Methods: Therefore to overcome with the problem the need raised to develop the framework for the maintenance of the project and for the automation testing. Project management framework provides an architecture which supports in managing the project by marinating the records of entire requirements, the test cases that were created for testing each unit of the software, defect raised from the past years. So through this the quality of the project can be maintained. Results: Automation framework provides the architecture which supports the development and implementation of the automation test script for the software testing process. Conclusion: For implementing project management framework the product of HP that is Application Lifecycle management is used which provides central repository to maintain the project.

  14. ADHD Coaching with College Students: Exploring the Processes Involved in Motivation and Goal Completion

    Science.gov (United States)

    Prevatt, Frances; Smith, Shannon M.; Diers, Sarah; Marshall, Diana; Coleman, Jennifer; Valler, Emilee; Miller, Nathan

    2017-01-01

    College students with attention-deficit/hyperactivity disorder (ADHD) often experience increased academic difficulties, which can negatively impact graduation rates, employment, self-esteem, and mental health. ADHD coaching assists students with ADHD to reduce such difficulties. The present study evaluated the processes involved in ADHD coaching…

  15. Dual Headquarters Involvement in Subsidiary Innovation

    DEFF Research Database (Denmark)

    Dellestrand, Henrik; Kappen, Philip; Nell, Phillip Christopher

    2014-01-01

    The strategy and international business literature has identified the overall potential for headquarters to add value by allocating resources to subsidiary activities, but little is known about the extent to which multiple headquarters simultaneously involves itself in subsidiary operations....... The current paper takes on this neglected question by empirically investigating corporate and divisional headquarters direct involvement in innovation development projects at the subsidiary level. Analyses that draw upon 85 innovation development projects in 23 multinational enterprises reveal that dual...... of the developing subsidiary positively moderates the two aforementioned effects on dual headquarters involvement in innovation development. The results lend support for the notion that parenting in complex structures entails complex headquarters structures. Thus, the results question simplistic views...

  16. Neural Networks Involved in Adolescent Reward Processing: An Activation Likelihood Estimation Meta-Analysis of Functional Neuroimaging Studies

    Science.gov (United States)

    Silverman, Merav H.; Jedd, Kelly; Luciana, Monica

    2015-01-01

    Behavioral responses to, and the neural processing of, rewards change dramatically during adolescence and may contribute to observed increases in risk-taking during this developmental period. Functional MRI (fMRI) studies suggest differences between adolescents and adults in neural activation during reward processing, but findings are contradictory, and effects have been found in non-predicted directions. The current study uses an activation likelihood estimation (ALE) approach for quantitative meta-analysis of functional neuroimaging studies to: 1) confirm the network of brain regions involved in adolescents’ reward processing, 2) identify regions involved in specific stages (anticipation, outcome) and valence (positive, negative) of reward processing, and 3) identify differences in activation likelihood between adolescent and adult reward-related brain activation. Results reveal a subcortical network of brain regions involved in adolescent reward processing similar to that found in adults with major hubs including the ventral and dorsal striatum, insula, and posterior cingulate cortex (PCC). Contrast analyses find that adolescents exhibit greater likelihood of activation in the insula while processing anticipation relative to outcome and greater likelihood of activation in the putamen and amygdala during outcome relative to anticipation. While processing positive compared to negative valence, adolescents show increased likelihood for activation in the posterior cingulate cortex (PCC) and ventral striatum. Contrasting adolescent reward processing with the existing ALE of adult reward processing (Liu et al., 2011) reveals increased likelihood for activation in limbic, frontolimbic, and striatal regions in adolescents compared with adults. Unlike adolescents, adults also activate executive control regions of the frontal and parietal lobes. These findings support hypothesized elevations in motivated activity during adolescence. PMID:26254587

  17. Summary of stakeholder engagement session of WPDD topical session on stakeholder involvement in decommissioning projects - November 14, 2005

    International Nuclear Information System (INIS)

    Chandler, Steve

    2006-01-01

    as important as technical rigour in these documents. The Italian presentation mentioned setting up a bilateral agreement on monitoring with local authorities. This seems like a step in the right direction, but the FSC would recommend far more than that to build public confidence. Today the public expects to be directly involved in decision making on major issues that affect them, not just via elected representatives. As I mentioned in my presentation on the situation in the UK, it is also important not to raise unrealistic expectations of how much the public can influence our decisions. In much UK legislation, decisions can only be made on a strictly technical basis and the opportunity for public influence is very limited. The presentation by EDF highlighted another vital requirement for successful stakeholder engagement. That is a disciplined, project based approach within the leading organizations. If stakeholder engagement is not meticulously planned it will flat on its face, as people will be given different messages at different times. So it is very important that this disciplined approach includes both local and national players to ensure consistency. Finally, the presentation from Germany mentioned the stepwise approach to decision making. This is very much in line with FSC recommendations. It is important that stakeholders are involved right from the start of the process, and not just in the final site selection stage. The steps involved in reaching a decision must be transparent and the opportunity for stakeholder involvement in each one needs to be clear. If the legal and procedural framework incorporate this stepwise approach explicitly it is a great help for stakeholder participation

  18. Appreciation of a Child’s Journey: Implementation of a Cardiac Action Research Project

    Directory of Open Access Journals (Sweden)

    Kate Alexa Dengler

    2012-01-01

    Full Text Available The aim of this paper is to provide an overview of the phases of the action research process involved in developing, implementing, and evaluating the Heart Beads program. The aim of the project is to enrich the hospital experience of children with cardiac conditions. Heart Beads involves children receiving unique beads specific to each cardiac treatment, procedure or event in recognition of their experiences, and endurance. An action research approach, involving a partnership between clinicians and researchers and emphasising the involvement of patients and their families, was used to guide the Heart Beads program. The project followed the five phases of action research: identification, investigation, program development, implementation, and evaluation. Heart Beads began as a small project which continues to grow in popularity and significance with children at a tertiary paediatric hospital in Sydney, Australia. The program is now being implemented nationwide with the vision that all Australian children hospitalised with cardiac conditions can benefit from Heart Beads.

  19. Mobility of persons who are blind: How the attentional processes and working memory are involved?

    OpenAIRE

    PIGEON, Caroline; MARIN-LAMELLET, Claude

    2015-01-01

    Although navigation without vision seems to strongly mobilize the attentional processes and the working memory, few studies seem to be conducted about the link between these processes and the mobility of people who are blind. The main aim of this PhD work is to consider the attentional and working memory capacities of people who are blind and investigate the attentional processes involved during the navigation activity. In the first part of this PhD work, blind participants (early and late) p...

  20. ASSESSMENT OF THE INQUIRY-BASED PROJECT IMPLEMENTATION PROCESS IN SCIENCE EDUCATION UPON STUDENTS’ POINTS OF VIEWS

    Directory of Open Access Journals (Sweden)

    Orhan AKINOGLU

    2008-01-01

    Full Text Available Aim of the study is to assess how students in 6th, 7th and 8th grades of primary education see the project works made in science education and their implementation processes. The study was fulfilled upon the descriptive survey model to collect data. Participants of the research were 100 students who had project implementation experiences in science education, and they were from 24 primary schools in 7 districts randomly chosen in the city of Istanbul in Turkey. Data of the study were collected by using a semi-constructed interview form offered to students during the 2005-2006 teaching year. In the research, following items were examined: The extent to which students are inspired from the previously made projects during their own project selection process, the level of scientific document survey and the effects of contemporary events, science and technology class topics and students’ interest areas. It was seen that internet is the mostly used source to obtain information. For students, one of the most problematic issues faced during the project implementation is the time limits set out by teacher. It was found that the most obvious benefit obtained by students from the project works is their increasing interest towards science and technology class. The most significant change seen by students regarding project preparation is their increasing grades in exams during and following the project works.

  1. Identification of Tools and Techniques to Enhance Interdisciplinary Collaboration During Design and Construction Projects.

    Science.gov (United States)

    Keys, Yolanda; Silverman, Susan R; Evans, Jennie

    2017-10-01

    The purpose of this study was to collect the perceptions of design professionals and clinicians regarding design process success strategies and elements of interprofessional engagement and communication during healthcare design and construction projects. Additional objectives were to gather best practices to maximize clinician engagement and provide tools and techniques to improve interdisciplinary collaboration for future projects. Strategies are needed to enhance the design and construction process and create interactions that benefit not only the project but the individuals working to see its completion. Meaningful interprofessional collaboration is essential to any healthcare design project and making sure the various players communicate is a critical element. This was a qualitative study conducted via an online survey. Respondents included architects, construction managers, interior designers, and healthcare personnel who had recently been involved in a building renovation or new construction project for a healthcare facility. Responses to open-ended questions were analyzed for themes, and descriptive statistics were used to provide insight into participant demographics. Information on the impressions, perceptions, and opportunities related to clinician involvement in design projects was collected from nurses, architects, interior designers, and construction managers. Qualitative analysis revealed themes of clinician input, organizational dynamics, and a variety of communication strategies to be the most frequently mentioned elements of successful interprofessional collaboration. This study validates the need to include clinician input in the design process, to consider the importance of organizational dynamics on design team functioning, and to incorporate effective communication strategies during design and construction projects.

  2. Public involvement in the dose reconstruction study: the colorado story

    International Nuclear Information System (INIS)

    Morin, Norma C.; Lockhart, Ann J.

    2000-01-01

    Public involvement was a critical component for building awareness, trust, and credibility for the dose reconstruction study for the Rocky Flats Nuclear Weapons Facility in Colorado. The research team developed a process to inform, involve, and encourage public participation over the nine-year study period. Key affected and interested groups with a legitimate stake in the study were identified and invited to identify concerns and offer suggestions for the study. In many cases, the public actually provided direction for the research. Many issues were studied more in-depth as result of public concern. Proactive community outreach was undertaken; quarterly public meetings and workshops were held to inform the public about the study's progress and to hear their comments. Quarterly newsletters were mailed to stake holders. A speaker's bureau was established and more than 50 presentations were made to 1,500 community members in various civic, business, neighborhood, and technical groups. Fact sheets, citizen summaries of technical reports, technical topic papers, and a video were developed to provide a complete overview of the studies and the findings at the conclusion of the project. The video was provided to local cable television stations, and publications were taken to local libraries. A web site was developed to allow the public to readily access information and to order technical reports. Public comments on draft technical reports were solicited; questions and concerns were addressed and investigated. The staff answered citizen calls, and the research team responded in writing to more than 200 issues raised by very concerned citizens. In addition, a citizen's group was formed in 1992 to conduct an independent study of plutonium levels found in soil samples collected around Rocky Flats. Made up of homeowners, public interest groups, local health departments, interested citizens, and Health Advisory Panel members, the committee arranged for sampling and analysis of

  3. [Motor capacities involved in the psychomotor skills of the cardiopulmonary resuscitation technique: recommendations for the teaching-learning process].

    Science.gov (United States)

    Miyadahira, A M

    2001-12-01

    It is a bibliographic study about the identification of the motor capacities involved in the psychomotor skills of the cardiopulmonary resuscitation (CPR) which aims to obtain subsidies to the planning of the teaching-learning process of this skill. It was found that: the motor capacities involved in the psychomotor skill of the CPR technique are predominantly cognitive and motor, involving 9 perceptive-motor capacities and 8 physical proficiency capacities. The CPR technique is a psychomotor skill classified as open, done in series and categorized as a thin and global skill and the teaching-learning process of the CPR technique has an elevated degree of complexity.

  4. 23 CFR 636.109 - How does the NEPA process relate to the design-build procurement process?

    Science.gov (United States)

    2010-04-01

    ... not include significant contingency as the result of risk placed on the design-builder associated with significant changes in the project definition arising out of the NEPA process. Therefore, with respect to the... agency coordination, public involvement, permit applications, or development of mitigation plans; or...

  5. Radiology Architecture Project Primer.

    Science.gov (United States)

    Sze, Raymond W; Hogan, Laurie; Teshima, Satoshi; Davidson, Scott

    2017-12-19

    The rapid pace of technologic advancement and increasing expectations for patient- and family-friendly environments make it common for radiology leaders to be involved in imaging remodel and construction projects. Most radiologists and business directors lack formal training in architectural and construction processes but are expected to play significant and often leading roles in all phases of an imaging construction project. Avoidable mistakes can result in significant increased costs and scheduling delays; knowledgeable participation and communication can result in a final product that enhances staff workflow and morale and improves patient care and experience. This article presents practical guidelines for preparing for and leading a new imaging architectural and construction project. We share principles derived from the radiology and nonradiology literature and our own experience over the past decade completely remodeling a large pediatric radiology department and building a full-service outpatient imaging center. Copyright © 2017 American College of Radiology. Published by Elsevier Inc. All rights reserved.

  6. Measuring societal effects of transdisciplinary research projects: design and application of an evaluation method.

    Science.gov (United States)

    Walter, Alexander I; Helgenberger, Sebastian; Wiek, Arnim; Scholz, Roland W

    2007-11-01

    Most Transdisciplinary Research (TdR) projects combine scientific research with the building of decision making capacity for the involved stakeholders. These projects usually deal with complex, societally relevant, real-world problems. This paper focuses on TdR projects, which integrate the knowledge of researchers and stakeholders in a collaborative transdisciplinary process through structured methods of mutual learning. Previous research on the evaluation of TdR has insufficiently explored the intended effects of transdisciplinary processes on the real world (societal effects). We developed an evaluation framework for assessing the societal effects of transdisciplinary processes. Outputs (measured as procedural and product-related involvement of the stakeholders), impacts (intermediate effects connecting outputs and outcomes) and outcomes (enhanced decision making capacity) are distinguished as three types of societal effects. Our model links outputs and outcomes of transdisciplinary processes via the impacts using a mediating variables approach. We applied this model in an ex post evaluation of a transdisciplinary process. 84 out of 188 agents participated in a survey. The results show significant mediation effects of the two impacts "network building" and "transformation knowledge". These results indicate an influence of a transdisciplinary process on the decision making capacity of stakeholders, especially through social network building and the generation of knowledge relevant for action.

  7. Krsko periodic safety review project prioritization process

    International Nuclear Information System (INIS)

    Basic, I.; Vrbanic, I.; Spiler, J.; Lambright, J.

    2004-01-01

    Definition of a Krsko Periodic Safety Review (PSR) project is a comprehensive safety review of a plant after last ten years of operation. The objective is a verification by means of a comprehensive review using current methods that Krsko NPP remains safety when judged against current safety objectives and practices and that adequate arrangements are in place to maintain plant safety. This objective encompasses the three main criteria or goals: confirmation that the plant is as safe as originally intended, determination if there are any structures, systems or components that could limit the life of the plant in the foreseeable future, and comparison the plant against modern safety standards and to identify where improvements would be beneficial at justifiable cost. Krsko PSR project is structured in the three phases: Phase 1: Preparation of Detailed 10-years PSR Program, Phase 2: Performing of 10-years PSR Program and preparing of associated documents (2001-2003), and Phase 3: Implementation of the prioritized compensatory measures and modifications (development of associated EEAR, DMP, etc.) after agreement with the SNSA on the design, procedures and time-scales (2004-2008). This paper presents the NEK PSR results of work performed under Phase 2 focused on the ranking of safety issues and prioritization of corrective measures needed for establishing an efficient action plan. Safety issues were identified in Phase 2 during the following review processes: Periodic Safety Review (PSR) task; Krsko NPP Regulatory Compliance Program (RCP) review; Westinghouse Owner Group (WOG) catalog items screening/review; SNSA recommendations (including IAEA RAMP mission suggestions/recommendations).(author)

  8. Stakeholder involvement report for the Cryocell reg-sign demonstration at Hanford

    International Nuclear Information System (INIS)

    Vick, J.D.; Peterson, T.S.; McCabe, G.H.; Niesen, K.A.; Serie, P.J.

    1995-01-01

    The US Department of Energy (DOE) is evaluating frozen soil subsurface barriers as a way, to contain the spread of contamination. CRACKLE is one such technology being evaluated in terms of technical performance, operating requirements, and cost of deployment in and soils. The primary source of data for this evaluation will be a full-scale field demonstration to be conducted at an uncontaminated site at the Hanford Reservation during fiscal years 1994--1996. Experience has shown that not addressing stakeholder concerns early on in the process of technology development can lead to expending resources on remedial approaches that are ultimately not deployable. Therefore the CRACKLE project worked with stakeholders to help ensure that stakeholder issues and concerns, that if left unacknowledged could delay or block the deployment of the technology, were addressed during the technology's demonstration. The insights gained from stakeholder involvement in the CRACKLE demonstration project apply to other remediation technologies. Section IV and Appendix A of this report provide additional information about stakeholder comments. Understanding these insights will allow remedial project managers to anticipate issues of concern to stakeholders, to involve them effectively and to speed up technology development, deployment, and environmental cleanup

  9. Stake holder involvement in Posiva's environmental impact assessment

    International Nuclear Information System (INIS)

    Vira, J.

    2002-01-01

    The application for the Decision in Principle must include the report from a completed environmental impact assessment (EIA). In general, the purpose of the EIA legislation is to bring more transparency and interaction among potential stakeholders into the planning of projects that may have a significant impact on their physical or social environment. In addition, the EIA should look at different alternatives of the project implementation and also consider the impact of not implementing the project at all, i.e., the so-called zero-alternative. For Posiva the EIA was an important consultation process for determining the basis for the continuation of the disposal project. Because of the strong vetoes that the Finnish legislation gives to several stakeholders Posiva's EIA work was focused on subjects that the public found of greatest concern. In this respect important stakeholder groups included the local people of the investigation communities and their representatives in the municipality councils, the regulators, the public administrators dealing with environmental and energy policy issues, the scientific community involved in related research as well as the whole population and their political representatives at the national level. (authors)

  10. Authentic research projects: Students' perspectives on the process, ownership, and benefits of doing research

    Science.gov (United States)

    Bernard, Warren

    2005-11-01

    Authentic research projects are one type of inquiry activity as defined by the American Association for the Advancement of Science (1993) and are a core component in science education reform movements. The purpose of this study was to examine high school students' perspectives of an authentic research project. The context for this study was a local Science and Engineering Fair (SEF) that involved students from a Metro-Atlanta public high school. This study provided information about this type of activity from the student's perspective, an emic viewpoint. In this qualitative study, demographic information was used for the purposeful selection of fourteen students making up the study sample. In this descriptive ethnography, data were collected via an open-ended survey, three individual interviews, a web log, and a group interview. Interviews were audio taped and conducted according to the protocol established by Lincoln and Guba (1998). Transcripts of the interviews, web logs, and survey responses were coded and analyzed by the constant comparative method as described by Glaser and Strauss (1965). Reliability and validity were achieved through member checks and triangulation. Using Gowin's Vee diagram (1981) as a theoretical framework for analysis, themes emerged describing the students' research experience. The themes included the students' initial reactions, difficulty getting started, accepting ownership of their project, growing interest, acknowledged benefits of the research experience, and a reflective look back at their experience. Overall, students described the authentic research experience as a worthwhile activity. The implications of the study are two-fold. At the practitioner level, teachers should engage students in research, but should do so in a manner that maximizes authenticity. Examples may include having students present a formal prospectus and work with a scientist mentor. For Science Educators in teacher preparation programs, there should be an

  11. Proposed Dunvegan hydroelectric project

    International Nuclear Information System (INIS)

    Houston, M.

    2001-01-01

    A new hydroelectric project is being proposed on the Peace River in the vicinity of Dunvegan, Alberta, by Glacier Power. The proposal calls for a low head, run-of-the-river hydroelectric power plant which would comprise a powerhouse containing 40 Kaplan turbines, a weir section, two fishways and a boat lock. The capacity of the generating plant would be 80 MW. As per established guidelines, the review process was initiated in July 1999 and is ongoing. Stakeholders, government agencies, both at the federal and provincial levels, are involved in the review process. The potential effects on the ice regime, fish passage and fish mortality and bank stability are the issues that have warranted the most attention to date. Scheduled to begin on October 2, 2001, a public hearing on the project has been arranged by the Alberta Energy and Utilities Board. The objective sought by Glacier Power is to have the project certified as being a green-power plant. Green power is defined as power produced from renewable sources with low environmental impact. The production of power with minimal environmental impacts is being encouraged in Alberta by Glacier Power, which sells power for a premium. 6 refs., 4 figs

  12. 1. annual workshop proceedings of integrated project fundamental processes of radionuclide migration IP Funmig

    International Nuclear Information System (INIS)

    Reiller, P.; Buckau, G.; Kienzler, B.; Duro, L.; Martell, M.

    2006-01-01

    These are the proceedings of the 1. Annual Workshop Proceedings of the Integrated Project FUNMIG (fundamental processes of radionuclide migration). The Annual Workshop was hosted by CEA and held in Saclay, 28 November - 1 December 2005. The project started January 2005 and has a duration of four years. The project makes use of annual workshops bringing the project partners together and inviting external groups to participate and contribute. Consequently, the present proceedings will be followed by another three proceedings from the forthcoming annual workshops to be held the end of 2006, 2007 and 2008. The 2. Annual Workshop will be hosted by SKB and be held in Stockholm, 21-23 November 2006. The proceedings serve several purposes. The key purpose is to document and make available to a broad scientific community the outcome of this project. A considerable part of the project activity reporting is also done through the proceedings. For this reason the first parts of the proceedings are structured around the workshop and the project. A large part of the proceedings, however, also contain individual scientific contributions by the project partners as well as external contributors. Information about the project can be found under www.funmig.com. (authors)

  13. Improving Packet Processing Performance in the ATLAS FELIX Project

    CERN Document Server

    AUTHOR|(SzGeCERN)752705; The ATLAS collaboration; Anderson, John Thomas; Borga, Andrea; Boterenbrood, Hendrik; Chen, Hucheng; Chen, Kai; Drake, Gary; Francis, David; Gorini, Benedetto; Lanni, Francesco; Lehmann Miotto, Giovanna; Levinson, Lorne; Narevicius, Julia; Plessl, Christian; Roich, Alexander; Ryu, Soo; Schreuder, Frans Philip; Vandelli, Wainer; Zhang, Jinlong; Vermeulen, Jos

    2015-01-01

    Experiments in high-energy physics (HEP) and related fields often impose constraints and challenges on data acquisition systems. As a result, these systems are implemented as unique mixtures of custom and commercial-off-the-shelf electronics (COTS), involving and connecting radiation-hard devices, large high-performance networks, and computing farms. FELIX, the Frontend Link Exchange, is a new PC-based general purpose data routing device for the data-acquisition system of the ATLAS experiment at CERN. Performance is a very crucial point for devices like FELIX, which have to be capable of processing tens of gigabyte of data per second. Thus it is important to understand the performance limitations for typical workloads on modern hardware. We present an analysis of a packet processing algorithm that is used in FELIX, and show how the PC system's memory architecture plays a key factor in the overall data throughput achieved by the application. Finally, we present optimizations that increase the processing throug...

  14. Science Song Project: Integration of Science, Technology and Music to Learn Science and Process Skills

    Directory of Open Access Journals (Sweden)

    Jiyoon Yoon

    2017-07-01

    Full Text Available It has been critical to find a way for teachers to motivate their young children to learn science and improve science achievement. Since music has been used as a tool for educating young students, this study introduces the science song project to teacher candidates that contains science facts, concepts, laws and theories, and combines them with music for motivating their young children to learn science and improve science achievement. The purpose of the study is to determine the effect of the science song project on teacher candidates’ understanding of science processing skills and their attitudes toward science. The participants were 45 science teacher candidates who were enrolled in an EC-6 (Early Childhood through Grade 6 program in the teacher certification program at a racially diverse Texas public research university. To collect data, this study used two instruments: pre-and post-self efficacy tests before and after the science teacher candidates experienced the science song project and final reflective essay at the end of the semester. The results show that while developing their songs, the participating teacher candidates experienced a process for science practice, understood science concepts and facts, and positively improved attitudes toward science. This study suggests that the science song project is a science instruction offering rich experiences of process-based learning and positive attitudes toward science.

  15. Management of uranium mining and processing wastes at Turamdih project

    International Nuclear Information System (INIS)

    Puri, R.C.; Verma, R.P.

    1991-01-01

    Based on environmental impact assessment, comprehensive plan for management of wastes has been drawn up. No solid waste from the mine is being disposed off outside the project area. The quantity of waste generated after processing of ore is large because of low content of uranium in the ore. A big tailings pond has been planned in specially selected suitable valley near the plant. No liquid effluents are to be discharged into general surrounding environment. Mine water is to be fed to the process plant. Effluents from tailings pond will be collected in a storage cum evaporation pond. All water from different zones of the project shall be collected in zonal ponds and then pumped to tailings effluent storage pond. All the ponds will be provided with requisite impervious liners. The effluents of the storage pond will be treated for removal of radium and manganese and discharged into monitoring pond. Large surface areas for various ponds are envisaged to take advantage of evaporation with aim for zero discharge. To reduce impact from gaseous emissions, high efficiency dust suppression and extraction systems shall be provided. High stacks have been incorporated for DG set, boiler plants, sulphuric acid plant and dust extraction systems for crushing and grinding section and the quality of discharges will be very much within the prescribed limits. The paper describes the management plan in detail. (author)

  16. 18th International Congress on Project Management and Engineering

    CERN Document Server

    Blanco, José; Capuz-Rizo, Salvador

    2016-01-01

    This volume features papers from the 18th International Congress on Project Management and Engineering, held by the University of Zaragoza in collaboration with the Spanish Association of Project Management and Engineering (AEIPRO). It illustrates the state of the art in this emerging area. Readers will discover ways to increase the effectiveness of project engineering as well as the efficiency of project management. The papers, written by international researchers and professionals, cover civil engineering and urban planning, product and process engineering, environmental engineering, energy efficiency and renewable energies, rural development, safety, labor risks and ergonomics, and training in project engineering. Overall, this book contributes to the improvement of project engineering research and enhances the transfer of results to the job of project engineers and project managers around the world. It will appeal to all professionals in the field as well as researchers and teachers involved in the traini...

  17. Parent Involvement in Education Project (PIEP): Annual Report.

    Science.gov (United States)

    Southwest Educational Development Lab., Austin, TX.

    This survey is the fifth in a series conducted to gather information about attitudinal barriers to parent involvement and to examine their implications for teacher training. In six states (Arkansas, Louisiana, Mississippi, New Mexico, Oklahoma, and Texas), school superintendents, school board presidents, and state agency officials were asked about…

  18. The insula is not specifically involved in disgust processing: an fMRI study.

    Science.gov (United States)

    Schienle, A; Stark, R; Walter, B; Blecker, C; Ott, U; Kirsch, P; Sammer, G; Vaitl, D

    2002-11-15

    fMRI studies have shown that the perception of facial disgust expressions specifically activates the insula. The present fMRI study investigated whether this structure is also involved in the processing of visual stimuli depicting non-mimic disgust elicitors compared to fear-inducing and neutral scenes. Twelve female subjects were scanned while viewing alternating blocks of 40 disgust-inducing, 40 fear-inducing and 40 affectively neutral pictures, shown for 1.5 s each. Afterwards, affective ratings were assessed. The disgust pictures, rated as highly repulsive, induced activation in the insula, the amygdala, the orbitofrontal and occipito-temporal cortex. Since during the fear condition the insula was also involved, our findings do not fit the idea of the insula as a specific disgust processor.

  19. Radioactive environmental impact assessment for a production project of titanium dioxide by chlorination process

    International Nuclear Information System (INIS)

    Qiu Guohua

    2010-01-01

    Based on the analysis of shifting direction of radionuclide in production process and the environmental investigation and monitoring, the radioactive environmental impact from a production project of titanium dioxide by chlorination process has been analyzed and assessed. The result of radioactive environmental investigation shows that values of assessment factors are in the range of environmental radioactive background. The radioactive environmental sensitive spot has been delineated. The results of radioactive environmental prediction show that the additional doses to workers and residents are 0.59 mSv/a and 9.28 × 10-4 mSv/a respectively which are less than the annual dose limits of administration. The radioactive environmental impact of the production project of the titanium dioxide by chlorination process will meet the needs of national regulations and standards if radiation protection and environmental protection measures are implemented and radioactive environmental monitoring are strengthened. (author)

  20. Which territorial integration of participative renewable energies? Present status and analysis of French projects. Final report

    International Nuclear Information System (INIS)

    Devisse, Jean-Stephane; Gilbert, Olivier; Reix, Fabien; GASPARD, Albane

    2016-02-01

    This study aimed at qualifying actors involved in projects (stakeholders, motivations, who decides what and how), at identifying the available resources (technical and financial abilities, project management abilities), at describing the mobilisation work and territorial dialogue processes, and at exploring how benefit distribution contributes to territorial dynamics. This study first identified participative renewable energy projects in France. A survey by questionnaire was then performed among project holders. Six projects have also been more deeply studied (a mix of solar and photovoltaic and wind energy, two wind farms located in two different regions, a solar photovoltaic project, a hydroelectric project, and a project on biomass from forest). After the methodology, the report defines what a participative renewable energy project is, proposes an overview of these projects in 2015, present the case studies, and proposes an analysis on the different aspects of the project process

  1. Numerical simulations of industrial processes involving fluid dynamics, combustion and radiation

    Energy Technology Data Exchange (ETDEWEB)

    Ducrocq, J [Air Liquide, Centre de Recherche Claude-Delorme, Jouy-en-Josas (France)

    1998-12-31

    Moving out of the scientific community research laboratories, computational fluid dynamics (CFD) software packages are now allowing industrials to analyse and optimize industrial processes involving the use of gases, liquids and even some two-phase fluids. Their attractiveness and their impact stems out from the opportunity they offer to bring insight into an existing unit, or even at the design stage, by displaying the spatial distribution of process relevant variables such as temperature, concentration. The filling of the spacing in between a two-layer window is a simple example. This new opportunity of visualisation is at times an unique way, when the process environment is an opaque one, such as liquid metal flowing into a tundish or when measurements of flows may be a long and tedious work, such as flows within water treatment basins. This environment we are to investigate in order to optimize can also be a harsh one, due to its high temperature level for example. Such are burners. But then pure fluid flow analysis, such as cold flow water models, has too many shortcomings. The description of combustion processes and of radiation become a necessary feature in order to describe thermal heat transfer or to locate `hot spots`. Such numerical models showing our oxycombustion expertise in glass melting will be presented. (author)

  2. Numerical simulations of industrial processes involving fluid dynamics, combustion and radiation

    Energy Technology Data Exchange (ETDEWEB)

    Ducrocq, J. [Air Liquide, Centre de Recherche Claude-Delorme, Jouy-en-Josas (France)

    1997-12-31

    Moving out of the scientific community research laboratories, computational fluid dynamics (CFD) software packages are now allowing industrials to analyse and optimize industrial processes involving the use of gases, liquids and even some two-phase fluids. Their attractiveness and their impact stems out from the opportunity they offer to bring insight into an existing unit, or even at the design stage, by displaying the spatial distribution of process relevant variables such as temperature, concentration. The filling of the spacing in between a two-layer window is a simple example. This new opportunity of visualisation is at times an unique way, when the process environment is an opaque one, such as liquid metal flowing into a tundish or when measurements of flows may be a long and tedious work, such as flows within water treatment basins. This environment we are to investigate in order to optimize can also be a harsh one, due to its high temperature level for example. Such are burners. But then pure fluid flow analysis, such as cold flow water models, has too many shortcomings. The description of combustion processes and of radiation become a necessary feature in order to describe thermal heat transfer or to locate `hot spots`. Such numerical models showing our oxycombustion expertise in glass melting will be presented. (author)

  3. Strategic Co-Location in a Hybrid Process Involving Desalination and Pressure Retarded Osmosis (PRO

    Directory of Open Access Journals (Sweden)

    William B. Krantz

    2013-07-01

    Full Text Available This paper focuses on a Hybrid Process that uses feed salinity dilution and osmotic power recovery from Pressure Retarded Osmosis (PRO to achieve higher overall water recovery. This reduces the energy consumption and capital costs of conventional seawater desalination and water reuse processes. The Hybrid Process increases the amount of water recovered from the current 66.7% for conventional seawater desalination and water reuse processes to a potential 80% through the use of reclaimed water brine as an impaired water source. A reduction of up to 23% in energy consumption is projected via the Hybrid Process. The attractiveness is amplified by potential capital cost savings ranging from 8.7%–20% compared to conventional designs of seawater desalination plants. A decision matrix in the form of a customizable scorecard is introduced for evaluating a Hybrid Process based on the importance of land space, capital costs, energy consumption and membrane fouling. This study provides a new perspective, looking at processes not as individual systems but as a whole utilizing strategic co-location to unlock the synergies available in the water-energy nexus for more sustainable desalination.

  4. Strategic Co-Location in a Hybrid Process Involving Desalination and Pressure Retarded Osmosis (PRO)

    Science.gov (United States)

    Sim, Victor S.T.; She, Qianhong; Chong, Tzyy Haur; Tang, Chuyang Y.; Fane, Anthony G.; Krantz, William B.

    2013-01-01

    This paper focuses on a Hybrid Process that uses feed salinity dilution and osmotic power recovery from Pressure Retarded Osmosis (PRO) to achieve higher overall water recovery. This reduces the energy consumption and capital costs of conventional seawater desalination and water reuse processes. The Hybrid Process increases the amount of water recovered from the current 66.7% for conventional seawater desalination and water reuse processes to a potential 80% through the use of reclaimed water brine as an impaired water source. A reduction of up to 23% in energy consumption is projected via the Hybrid Process. The attractiveness is amplified by potential capital cost savings ranging from 8.7%–20% compared to conventional designs of seawater desalination plants. A decision matrix in the form of a customizable scorecard is introduced for evaluating a Hybrid Process based on the importance of land space, capital costs, energy consumption and membrane fouling. This study provides a new perspective, looking at processes not as individual systems but as a whole utilizing strategic co-location to unlock the synergies available in the water-energy nexus for more sustainable desalination. PMID:24956940

  5. Project T.E.A.M. (Technical Education Advancement Modules). Introduction to Statistical Process Control.

    Science.gov (United States)

    Billings, Paul H.

    This instructional guide, one of a series developed by the Technical Education Advancement Modules (TEAM) project, is a 6-hour introductory module on statistical process control (SPC), designed to develop competencies in the following skill areas: (1) identification of the three classes of SPC use; (2) understanding a process and how it works; (3)…

  6. Defense waste processing facility project at the Savannah River Plant

    International Nuclear Information System (INIS)

    Baxter, R.G.; Maher, R.; Mellen, J.B.; Shafranek, L.F.; Stevens, W.R. III.

    1984-01-01

    The Du Pont Company is building for the Department of Energy a facility to vitrify high-level waste at the Savannah River Plant near Aiken, South Carolina. The Defense Waste Processing Facility (DWPF) will solidify existing and future radioactive wastes produced by defense activities at the site. At the present time engineering and design are 45% complete, the site has been cleared, and startup is expected in 1989. This paper will describe project status as well as features of the design. 9 figures

  7. Advertising Citizen Science: A Trailer for the Citizen Sky Project

    Science.gov (United States)

    Wyatt, Ryan; Price, A.

    2012-01-01

    Citizen Sky is a multi-year, NSF funded citizen science project involving the bright and mysterious variable star epsilon Aurigae. The project was conceived by the IYA 2009 working group on Research Experiences for Students, Teachers, and Citizen-Scientists. Citizen Sky goes beyond simple observing to include a major data analysis component, introducing participants to the full scientific process from background research to paper writing for a peer-reviewed journal. As a means of generating interest in the project, the California Academy of Sciences produced a six-minute "trailer” formatted for both traditional and fulldome planetariums as well as HD and web applications. This talk will review the production process for the trailer as well as the methods of distribution via planetariums, social media, and other venues_along with an update on the Citizen Sky Project as a whole. We will show how to use a small, professionally-produced planetarium trailer to help spread word on a citizen science project. We will also show preliminary results on a study about how participation level/type in the project affects science learning.

  8. Involvement of the Warburg effect in non-tumor diseases processes.

    Science.gov (United States)

    Chen, Zhe; Liu, Meiqing; Li, Lanfang; Chen, Linxi

    2018-04-01

    Warburg effect, as an energy shift from mitochondrial oxidative phosphorylation to aerobic glycolysis, is extensively found in various cancers. Interestingly, increasing researchers show that Warburg effect plays a crucial role in non-tumor diseases. For instance, inhibition of Warburg effect can alleviate pulmonary vascular remodeling in the process of pulmonary hypertension (PH). Interference of Warburg effect improves mitochondrial function and cardiac function in the process of cardiac hypertrophy and heart failure. Additionally, the Warburg effect induces vascular smooth muscle cell proliferation and contributes to atherosclerosis. Warburg effect may also involve in axonal damage and neuronal death, which are related with multiple sclerosis. Furthermore, Warburg effect significantly promotes cell proliferation and cyst expansion in polycystic kidney disease (PKD). Besides, Warburg effect relieves amyloid β-mediated cell death in Alzheimer's disease. And Warburg effect also improves the mycobacterium tuberculosis infection. Finally, we also introduce some glycolytic agonists. This review focuses on the newest researches about the role of Warburg effect in non-tumor diseases, including PH, tuberculosis, idiopathic pulmonary fibrosis (IPF), failing heart, cardiac hypertrophy, atherosclerosis, Alzheimer's diseases, multiple sclerosis, and PKD. Obviously, Warburg effect may be a potential therapeutic target for those non-tumor diseases. © 2017 Wiley Periodicals, Inc.

  9. Relationship between time management in construction industry and project management performance

    Science.gov (United States)

    Nasir, Najuwa; Nawi, Mohd Nasrun Mohd; Radzuan, Kamaruddin

    2016-08-01

    Nowadays, construction industry particularly in Malaysia struggle in achieving status of eminent time management for construction project. Project managers have a great responsibility to keep the project success under time of project completion. However, studies shows that delays especially in Malaysian construction industry still unresolved due to weakness in managing the project. In addition, quality of time management on construction projects is generally poor. Due to the progressively extended delays issue, time performance becomes an important subject to be explored to investigate delay factors. The method of this study is review of literature towards issues in construction industry which affecting time performance of project in general by focusing towards process involved for project management. Based on study, it was found that knowledge, commitment, cooperation are the main criteria as an overall to manage the project into a smooth process during project execution until completion. It can be concluded that, the strength between project manager and team members in these main criteria while conducting the project towards good time performance is highly needed. However, there is lack of establishment towards factors of poor time performance which strongly related with project management. Hence, this study has been conducted to establish factors of poor time performance and its relations with project management.

  10. Problems and risks involved in the projected storage of radioactive waste in a salt dome in the northwest of the FRG

    International Nuclear Information System (INIS)

    Mauthe, F.

    1979-01-01

    Current planning envisages long-term intermediate storage of radioactive waste and the exploration of the Gorleben salt dome by deep drilling in order to start appropriate mining work in case of favourable drilling results. The statements presented here on the problem of the 'Feasibility of ultimate storage of radioactive waste in salt deposits' (subject selected by the Government of the land Lower-Saxony) are aimed at informing the general public about the difficulties and problems involved in this waste disposal project and critically assess the arguments put forward by industry and licensing authorities in order to gain acceptance for this politically delicate project; the argumentation discussed here mainly refers to the field of geological science. (orig.) [de

  11. Public involvement in the decision making process, Argentine experience

    International Nuclear Information System (INIS)

    Clein, D.

    1999-01-01

    In the frame of a young participative democracy the Comision Nacional de Energia Atomica (C.N.E.A.), technical and legal responsible for radioactive waste management, is developing a plan for the close out of tailings facilities from past mining and milling operations and the environmental restoration of nine different sites in six provinces all over the country. In the first site, Malargue Facility, different activities have been developed promoting public involvement in the decision making process. The lessons learned and the experience acquired have given the background for the systematization of public consultation in the ongoing and future stages of the plan. Malargue's experience in this field will be analyzed stressing on different aspects considered of importance for the design of a communicational strategy adapted to the characteristics of a society without experience in this field. The influence of public concern on conservative bias of technical decisions will be evaluated. (author)

  12. Adding value to the decision-making process of mega projects : Fostering strategic ambiguity, redundancy, and resilience

    NARCIS (Netherlands)

    Giezen, Mendel; Salet, Willem; Bertolini, Luca

    2015-01-01

    Current practice in decision-making about mega projects seems to be aimed at reducing complexity by simplification. However, this is often detrimental to the resilience and added value of these projects. This article uses the concept of strategic capacity for analyzing the decision-making process on

  13. Improving the active involvement of stakeholders and the public in flood risk management – tools of an involvement strategy and case study results from Austria, Germany and Italy

    Directory of Open Access Journals (Sweden)

    V. Vitale

    2012-09-01

    Full Text Available The EU Flood Risk Management Directive 2007/60/EC aims at an active involvement of interested parties in the setting up of flood risk management plans and thus calls for more governance-related decision-making. This requirement has two perspectives. On the one hand, there is (1 the question of how decision-makers can improve the quality of their governance process. On the other hand, there is (2 the question of how the public shall be appropriately informed and involved. These questions were the centre of the ERA-Net CRUE-funded project IMRA (integrative flood risk governance approach for improvement of risk awareness that aimed at an optimisation of the flood risk management process by increasing procedural efficiency with an explicit involvement strategy. To reach this goal, the IMRA project partners developed two new approaches that were implemented in three case study areas for the first time in flood risk management: 1. risk governance assessment tool: An indicator-based benchmarking and monitoring tool was used to evaluate the performance of a flood risk management system in regard to ideal risk governance principles; 2. social milieu approach: The concept of social milieus was used to gain a picture of the people living in the case study regions to learn more about their lifestyles, attitudes and values and to use this knowledge to plan custom-made information and participation activities for the broad public. This paper presents basic elements and the application of two innovative approaches as a part of an "involvement strategy" that aims at the active involvement of all interested parties (stakeholders for assessing, reviewing and updating flood risk management plans, as formulated in the EU Flood Risk Management Directive 2007/60/EC.

  14. TF-finder: A software package for identifying transcription factors involved in biological processes using microarray data and existing knowledge base

    Directory of Open Access Journals (Sweden)

    Cui Xiaoqi

    2010-08-01

    Full Text Available Abstract Background Identification of transcription factors (TFs involved in a biological process is the first step towards a better understanding of the underlying regulatory mechanisms. However, due to the involvement of a large number of genes and complicated interactions in a gene regulatory network (GRN, identification of the TFs involved in a biology process remains to be very challenging. In reality, the recognition of TFs for a given a biological process can be further complicated by the fact that most eukaryotic genomes encode thousands of TFs, which are organized in gene families of various sizes and in many cases with poor sequence conservation except for small conserved domains. This poses a significant challenge for identification of the exact TFs involved or ranking the importance of a set of TFs to a process of interest. Therefore, new methods for recognizing novel TFs are desperately needed. Although a plethora of methods have been developed to infer regulatory genes using microarray data, it is still rare to find the methods that use existing knowledge base in particular the validated genes known to be involved in a process to bait/guide discovery of novel TFs. Such methods can replace the sometimes-arbitrary process of selection of candidate genes for experimental validation and significantly advance our knowledge and understanding of the regulation of a process. Results We developed an automated software package called TF-finder for recognizing TFs involved in a biological process using microarray data and existing knowledge base. TF-finder contains two components, adaptive sparse canonical correlation analysis (ASCCA and enrichment test, for TF recognition. ASCCA uses positive target genes to bait TFS from gene expression data while enrichment test examines the presence of positive TFs in the outcomes from ASCCA. Using microarray data from salt and water stress experiments, we showed TF-finder is very efficient in recognizing

  15. DECOMPOSITION OF MANUFACTURING PROCESSES: A REVIEW

    Directory of Open Access Journals (Sweden)

    N.M.Z.N. Mohamed

    2012-06-01

    Full Text Available Manufacturing is a global activity that started during the industrial revolution in the late 19th century to cater for the large-scale production of products. Since then, manufacturing has changed tremendously through the innovations of technology, processes, materials, communication and transportation. The major challenge facing manufacturing is to produce more products using less material, less energy and less involvement of labour. To face these challenges, manufacturing companies must have a strategy and competitive priority in order for them to compete in a dynamic market. A review of the literature on the decomposition of manufacturing processes outlines three main processes, namely: high volume, medium volume and low volume. The decomposition shows that each sub process has its own characteristics and depends on the nature of the firm’s business. Two extreme processes are continuous line production (fast extreme and project shop (slow extreme. Other processes are in between these two extremes of the manufacturing spectrum. Process flow patterns become less complex with cellular, line and continuous flow compared with jobbing and project. The review also indicates that when the product is high variety and low volume, project or functional production is applied.

  16. CONCEPT OF IN-OIL PROJECT BASED ON BIOCONVERSION OF BY-PRODUCTS FROM FOOD PROCESSING INDUSTRY

    Directory of Open Access Journals (Sweden)

    Wojciech Czekała

    2017-09-01

    The main assumption of the project is based on the introduction of by-products from the food processing industry to feeding with larvae of H. illucens. Biomass of insect larvae will then be processed into products that will be used for feed and energy purposes.

  17. The process of life-cycle cost analysis on the Fernald Environmental Management Project

    International Nuclear Information System (INIS)

    Chang, D.Y.; Jacoboski, J.A.; Fisher, L.A.; Beirne, P.J.

    1993-01-01

    The Estimating Services Department of the Fernald Environmental Restoration Management Corporation (FERMCO) is formalizing the process of life-cycle cost analysis (LCCA) for the Fernald Environmental Management Project (FEMP). The LCCA process is based on the concepts, principles, and guidelines described by applicable Department of Energy's (DOE) orders, pertinent published literature, and the National Bureau of Standards handbook 135. LCC analyses will be performed following a ten-step process on the FEMP at the earliest possible decision point to support the selection of the least-cost alternatives for achieving the FERMCO mission

  18. Diurnal rhythmicity in biological processes involved in bioavailability of functional food factors.

    Science.gov (United States)

    Tsurusaki, Takashi; Sakakibara, Hiroyuki; Aoshima, Yoshiki; Yamazaki, Shunsuke; Sakono, Masanobu; Shimoi, Kayoko

    2013-05-01

    In the past few decades, many types of functional factors have been identified in dietary foods; for example, flavonoids are major groups widely distributed in the plant kingdom. However, the absorption rates of the functional food factors are usually low, and many of these are difficult to be absorbed in the intact forms because of metabolization by biological processes during absorption. To gain adequate beneficial effects, it is therefore mandatory to know whether functional food factors are absorbed in sufficient quantity, and then reach target organs while maintaining beneficial effects. These are the reasons why the bioavailability of functional food factors has been well investigated using rodent models. Recently, many of the biological processes have been reported to follow diurnal rhythms recurring every 24 h. Therefore, absorption and metabolism of functional food factors influenced by the biological processes may vary with time of day. Consequently, the evaluation of the bioavailability of functional food factors using rodent models should take into consideration the timing of consumption. In this review, we provide a perspective overview of the diurnal rhythm of biological processes involved in the bioavailability of functional food factors, particularly flavonoids.

  19. Involving users in the development of embedded technology in construction

    DEFF Research Database (Denmark)

    Storgaard, Kresten; Buch-Hansen, Thomas Cornelius; Ærenlund, Lærke

    2011-01-01

    Based on a project about user driven innovation and embedded technology in construction (BIIB), the paper discusses methodological issues on user involvement. In the paper especially focus is on the experiences on involving users in collaborative development of scenarios, in the validation...... of scenarios and in developing innovative solutions on a conceptual level. The project discusses 1) concepts of users and 2) methods for collaborative involvement. The first discussion involves presentation of an extended user concept and a discussion of differences between lead users and need-advanced users....... The second discussion on collaborative involvement, discuss experiences with methods for communication across cultural and professional competences with reference to boundary objects, tangible systems and visualization. In the project four segments of situations for use of embedded technology in construction...

  20. A Data Specification for Software Project Performance Measures: Results of a Collaboration on Performance Measurement

    National Research Council Canada - National Science Library

    Kasunic, Mark

    2008-01-01

    ... between completed projects. These terms and definitions were developed using a collaborative, consensus-based approach involving the Software Engineering Institute's Software Engineering Process Management program and service...