WorldWideScience

Sample records for project environmental systems

  1. Management systems for environmental restoration projects

    International Nuclear Information System (INIS)

    Harbert, R.R.

    1990-01-01

    This paper reports that the success fo large environmental restoration projects depends on sound management systems to guide the team of organizations and individuals responsible for the project. Public concern about and scrutiny of these environmental projects increase the stakes for those involved in the management of projects. The Department of Energy (DOE) Formerly Utilized Sites Remedial Action Program (FUSRAP) uses a system approach to performing and improving the work necessary to meet FUSRAP objectives. This approach to preforming and improving the work necessary to meet FUSRAP objectives. This approach is based upon management criteria embodied in DOE cost and schedule control system and the quality assurance requirements. The project team used complementary criteria to develop a system of related parts and processes working together to accomplish the goals of the project

  2. Environmental Restoration Project - Systems Engineering Management Plan

    International Nuclear Information System (INIS)

    Anderson, T.D.

    1998-06-01

    This Environmental Restoration (ER) Project Systems Engineering Management Plan (SEMP) describes relevant Environmental Restoration Contractor (ERC) management processes and shows how they implement systems engineering. The objective of this SEMP is to explain and demonstrate how systems engineering is being approached and implemented in the ER Project. The application of systems engineering appropriate to the general nature and scope of the project is summarized in Section 2.0. The basic ER Project management approach is described in Section 3.0. The interrelation and integration of project practices and systems engineering are outlined in Section 4.0. Integration with sitewide systems engineering under the Project Hanford Management Contract is described in Section 5.0

  3. UIS BW environmental information system Baden-Wuerttemberg. R+D project INOVUM. Innovative environmental information systems. Phase I 2014/16

    International Nuclear Information System (INIS)

    Weissenbach, Kurt; Schillinger, Wolfgang; Weidemann, Rainer

    2016-01-01

    The R and D project INOVUM of the Ministry for the Environment, Climate and Energy Baden-Wuerttemberg relies on a wide cooperation with partners from government, science and industry to jointly develop governmental environmental information systems. In the focus of this project phase were, e.g. a revision of the framework concept for the Environmental Information System Baden-Wuerttemberg, service-based applications, the development of environmental portals, mobile applications and map services.

  4. Integration of project management and systems engineering: Tools for a total-cycle environmental management system

    International Nuclear Information System (INIS)

    Blacker, P.B.; Winston, R.

    1997-01-01

    An expedited environmental management process has been developed at the Idaho National Engineering and Environmental Laboratory (INEEL). This process is one result of the Lockheed Martin commitment to the US Department of Energy to incorporate proven systems engineering practices with project management and program controls practices at the INEEL. Lockheed Martin uses a graded approach of its management, operations, and systems activities to tailor the level of control to the needs of the individual projects. The Lockheed Martin definition of systems engineering is: ''''Systems Engineering is a proven discipline that defines and manages program requirements, controls risk, ensures program efficiency, supports informed decision making, and verifies that products and services meet customer needs.'''' This paper discusses: the need for an expedited environmental management process; how the system was developed; what the system is; what the system does; and an overview of key components of the process

  5. Environmental Compliance Management System

    International Nuclear Information System (INIS)

    Brownson, L.W.; Krsul, T.; Peralta, R.A.; Knudson, D.A.; Rosignolo, C.L.

    1992-01-01

    Argonne National Laboratory (ANL) is developing the Environmental Compliance Management System (ECMS) as a comprehensive, cost-effective tool to ensure (1) that the Laboratory complies with all applicable federal and state environmental laws and regulations, (2) that environmental issues and concerns are recognized and considered in the early phases of projects; and (3) that Laboratory personnel conduct Laboratory operations in the most environmentally acceptable manner. The ECMS is an expert computer system which is designed to allow project engineers to perform an environmental evaluation of their projects. The system includes a Master Program which collects basic project information, provide utility functions, and access the environmental expert modules, environmental expert system modules for each federal and state environmental law which allows the user to obtain specific information on how an individual law may affect his project; and site-specific databases which contain information necessary for effective management of the site under environmental regulations. The ECMS will have the capability to complete and print many of the necessary environmental forms required by federal and state agencies, including the Department of Energy

  6. NPOESS Preparatory Project (NPP) Environmental Products

    Science.gov (United States)

    Grant, K. D.; Smith, D. C.

    2011-12-01

    The National Oceanic and Atmospheric Administration (NOAA) and National Aeronautics and Space Administration (NASA) are jointly acquiring the next-generation civilian weather and environmental satellite system: the Joint Polar Satellite System (JPSS). The Joint Polar Satellite System will contribute the afternoon orbit component and ground processing system of the restructured National Polar-orbiting Operational Environmental Satellite System (NPOESS). As such, the Joint Polar Satellite System replaces the current Polar-orbiting Operational Environmental Satellites (POES) managed by NOAA and the ground processing component of both POES and the Defense Meteorological Satellite Program (DMSP) replacement, known as the Defense Weather Satellite System (DWSS), managed by the Department of Defense (DoD). The Joint Polar Satellite System satellite will carry a suite of sensors designed to collect meteorological, oceanographic, climatological, and solar-geophysical observations of the earth, atmosphere, and space. The ground processing system for the Joint Polar Satellite System is known as the Common Ground System (JPSS CGS), and consists of a Command, Control, and Communications Segment (C3S) and the Interface Data Processing Segment (IDPS). Both are developed by Raytheon Intelligence and Information Systems (IIS). The Interface Data Processing Segment will process Joint Polar Satellite System and Defense Weather Satellite System satellite data to provide environmental data products (aka, Environmental Data Records or EDRs) to the National Oceanic and Atmospheric Administration and Department of Defense processing centers operated by the United States government. The Interface Data Processing Segment will process Environmental Data Records beginning with the NPOESS Preparatory Project (NPP) and continue through the lifetime of the Joint Polar Satellite System and Defense Weather Satellite System programs. Under the National Polar-orbiting Operational Environmental

  7. An outline of the application of an environmental management system to the PRAMU (Uranium Mining Environmental Restitution Project)

    International Nuclear Information System (INIS)

    Smetniansky de De Grande, Nelida; Avila Cadena, Guadalberto; Cardozo, Damian

    2000-01-01

    In Argentina the National Atomic Energy Commission (CNEA) has the responsibility to restore uranium mining facilities, when milling operations have been shut down. To carry out this clean up actions CNEA created the Project for Uranium Mining Environmental Restoration (PRAMU in Spanish). To take into account the environmental aspects of the restoration activities, the PRAMU includes in its management an Environmental Management System (SGA in Spanish), which is of central importance in determining the environmental policy, objectives and targets. In this work a general view of the Environmental Management System is presented and an example of one of the environmental programs to be implemented is detailed. (author)

  8. Enforcement management system for decommissioning project in Ningyo-toge Environmental Engineering Center. Results of activities in fiscal year 2014

    International Nuclear Information System (INIS)

    Ema, Akira; Miyagawa, Hiroshi; Ishimori, Yuu

    2016-03-01

    The Ningyo-toge Environmental Engineering Center of the Japan Atomic Energy Agency had managed the decommissioning project based on the Quality Management System and the Environmental Management System, but found that these systems were unsuitable for project management from several viewpoints. In order to solve these problems, the Task Team for Enforcement Backend Project temporarily managed the decommissioning project in 2013. To enforce the project management systematically, the Research and Development Promotion Section was organized newly in the Environmental Research and Development Department in April 2014, and started the project management. On the other hand, to establish the primary and secondary documents related to the new system, until April 2015 the section has been developing the Enforcement Management System (EMS) to separate from the Quality Management System or the Environmental Management System. This report summarizes the state of these activities in the FY 2014. Section 1 presents the introduction. Section 2 explains the procedure of the project management and its achievements. Section 3 discusses how to develop the primary and secondary documents. Section 4 concludes the new management system and further views. (author)

  9. GENII: The Hanford Environmental Radiation Dosimetry Software System: Volume 2, Users' manual: Hanford Environmental Dosimetry Upgrade Project

    International Nuclear Information System (INIS)

    Napier, B.A.; Peloquin, R.A.; Strenge, D.L.; Ramsdell, J.V.

    1988-11-01

    The Hanford Environmental Dosimetry Upgrade Project was undertaken to incorporate the internal dosimetry models recommended by the International Commission on Radiological Protection (ICRP) in updated versions of the environmental pathway analysis models used at Hanford. The resulting second generation of Hanford environmental dosimetry computer codes is compiled in the Hanford Environmental Dosimetry System (Generation II, or GENII). The purpose of this coupled system of computer codes is to analyze environmental contamination of, air, water, or soil. This is accomplished by calculating radiation doses to individuals or populations. GENII is described in three volumes of documentation. This second volume is a Users' Manual, providing code structure, users' instructions, required system configurations, and QA-related topics. The first volume describes the theoretical considerations of the system. The third volume is a Code Maintenance Manual for the user who requires knowledge of code detail. It includes logic diagrams, global dictionary, worksheets, example hand calculations, and listings of the code and its associated data libraries. 27 refs., 17 figs., 23 tabs

  10. Environmental Assessment Lakeview Geothermal Project

    Energy Technology Data Exchange (ETDEWEB)

    Treis, Tania [Southern Oregon Economic Development Department, Medford, OR (United States)

    2012-04-30

    The Town of Lakeview is proposing to construct and operate a geothermal direct use district heating system in Lakeview, Oregon. The proposed project would be in Lake County, Oregon, within the Lakeview Known Geothermal Resources Area (KGRA). The proposed project includes the following elements: Drilling, testing, and completion of a new production well and geothermal water injection well; construction and operation of a geothermal production fluid pipeline from the well pad to various Town buildings (i.e., local schools, hospital, and Lake County Industrial Park) and back to a geothermal water injection well. This EA describes the proposed project, the alternatives considered, and presents the environmental analysis pursuant to the National Environmental Policy Act. The project would not result in adverse effects to the environment with the implementation of environmental protection measures.

  11. A program-level management system for the life cycle environmental and economic assessment of complex building projects

    International Nuclear Information System (INIS)

    Kim, Chan-Joong; Kim, Jimin; Hong, Taehoon; Koo, Choongwan; Jeong, Kwangbok; Park, Hyo Seon

    2015-01-01

    Climate change has become one of the most significant environmental issues, of which about 40% come from the building sector. In particular, complex building projects with various functions have increased, which should be managed from a program-level perspective. Therefore, this study aimed to develop a program-level management system for the life-cycle environmental and economic assessment of complex building projects. The developed system consists of three parts: (i) input part: database server and input data; (ii) analysis part: life cycle assessment and life cycle cost; and (iii) result part: microscopic analysis and macroscopic analysis. To analyze the applicability of the developed system, this study selected ‘U’ University, a complex building project consisting of research facility and residential facility. Through value engineering with experts, a total of 137 design alternatives were established. Based on these alternatives, the macroscopic analysis results were as follows: (i) at the program-level, the life-cycle environmental and economic cost in ‘U’ University were reduced by 6.22% and 2.11%, respectively; (ii) at the project-level, the life-cycle environmental and economic cost in research facility were reduced 6.01% and 1.87%, respectively; and those in residential facility, 12.01% and 3.83%, respective; and (iii) for the mechanical work at the work-type-level, the initial cost was increased 2.9%; but the operation and maintenance phase was reduced by 20.0%. As a result, the developed system can allow the facility managers to establish the operation and maintenance strategies for the environmental and economic aspects from a program-level perspective. - Highlights: • A program-level management system for complex building projects was developed. • Life-cycle environmental and economic assessment can be conducted using the system. • The design alternatives can be analyzed from the microscopic perspective. • The system can be used to

  12. A program-level management system for the life cycle environmental and economic assessment of complex building projects

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Chan-Joong [Parsons Brinckerhoff, Seoul 135-763 (Korea, Republic of); Kim, Jimin; Hong, Taehoon; Koo, Choongwan; Jeong, Kwangbok; Park, Hyo Seon [Department of Architectural Engineering, Yonsei University, Seoul 120-749 (Korea, Republic of)

    2015-09-15

    Climate change has become one of the most significant environmental issues, of which about 40% come from the building sector. In particular, complex building projects with various functions have increased, which should be managed from a program-level perspective. Therefore, this study aimed to develop a program-level management system for the life-cycle environmental and economic assessment of complex building projects. The developed system consists of three parts: (i) input part: database server and input data; (ii) analysis part: life cycle assessment and life cycle cost; and (iii) result part: microscopic analysis and macroscopic analysis. To analyze the applicability of the developed system, this study selected ‘U’ University, a complex building project consisting of research facility and residential facility. Through value engineering with experts, a total of 137 design alternatives were established. Based on these alternatives, the macroscopic analysis results were as follows: (i) at the program-level, the life-cycle environmental and economic cost in ‘U’ University were reduced by 6.22% and 2.11%, respectively; (ii) at the project-level, the life-cycle environmental and economic cost in research facility were reduced 6.01% and 1.87%, respectively; and those in residential facility, 12.01% and 3.83%, respective; and (iii) for the mechanical work at the work-type-level, the initial cost was increased 2.9%; but the operation and maintenance phase was reduced by 20.0%. As a result, the developed system can allow the facility managers to establish the operation and maintenance strategies for the environmental and economic aspects from a program-level perspective. - Highlights: • A program-level management system for complex building projects was developed. • Life-cycle environmental and economic assessment can be conducted using the system. • The design alternatives can be analyzed from the microscopic perspective. • The system can be used to

  13. 1995 project of the year Hanford Environmental compliance project nomination

    Energy Technology Data Exchange (ETDEWEB)

    Kelly, J.R.

    1996-02-01

    The completion of the Hanford Environmental Compliance (HEC) Project in December 1995 brought to a successful close a long line of major contributions to environmental cleanup. Not since the early days of the Hanford Site during and shortly after World War 11 had such a large group of diverse construction activities, with a common goal, been performed at Hanford. Key to this success was the unique combination of 14 subprojects under the HEC Project which afforded the flexibility to address evolving subproject requirements. This strategy resulted in the accomplishment of the HEC Project stakeholders` objectives on an aggressive schedule, at a $33 million cost savings to the customer. The primary objectives of the HEC Project were to upgrade selected Hanford Site facilities and systems to bring them into compliance with current environmental standards and regulations. The HEC Project contributed significantly towards the Hanford site compliance with Clean Water Act, Resource Conservation and Recovery Act (RCRA) and Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) requirements. It provided, in part, those construction activities required to comply with those requirements in the areas of liquid and solid waste treatment and disposal, waste characterization, and groundwater monitoring.

  14. 1995 project of the year Hanford Environmental compliance project nomination

    International Nuclear Information System (INIS)

    Kelly, J.R.

    1996-02-01

    The completion of the Hanford Environmental Compliance (HEC) Project in December 1995 brought to a successful close a long line of major contributions to environmental cleanup. Not since the early days of the Hanford Site during and shortly after World War 11 had such a large group of diverse construction activities, with a common goal, been performed at Hanford. Key to this success was the unique combination of 14 subprojects under the HEC Project which afforded the flexibility to address evolving subproject requirements. This strategy resulted in the accomplishment of the HEC Project stakeholders' objectives on an aggressive schedule, at a $33 million cost savings to the customer. The primary objectives of the HEC Project were to upgrade selected Hanford Site facilities and systems to bring them into compliance with current environmental standards and regulations. The HEC Project contributed significantly towards the Hanford site compliance with Clean Water Act, Resource Conservation and Recovery Act (RCRA) and Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) requirements. It provided, in part, those construction activities required to comply with those requirements in the areas of liquid and solid waste treatment and disposal, waste characterization, and groundwater monitoring

  15. UIS BW environmental information system Baden-Wuerttemberg. R+D project INOVUM. Innovative environmental information systems. Phase I 2014/16; UIS BW Umweltinformationssystem Baden-Wuerttemberg. F+E-Vorhaben INOVUM. Innovative Umweltinformationssysteme. Phase I 2014/16

    Energy Technology Data Exchange (ETDEWEB)

    Weissenbach, Kurt [Ministerium fuer Umwelt, Klima und Energiewirtschaft Baden-Wuerttemberg, Stuttgart (Germany); Schillinger, Wolfgang [Landesanstalt fuer Umwelt, Messungen und Naturschutz Baden-Wuerttemberg (LUBW), Karlsruhe (Germany); Weidemann, Rainer (ed.) [Karlsruher Institut fuer Technologie (Germany). Inst. fuer Angewandte Informatik

    2016-07-01

    The R and D project INOVUM of the Ministry for the Environment, Climate and Energy Baden-Wuerttemberg relies on a wide cooperation with partners from government, science and industry to jointly develop governmental environmental information systems. In the focus of this project phase were, e.g. a revision of the framework concept for the Environmental Information System Baden-Wuerttemberg, service-based applications, the development of environmental portals, mobile applications and map services.

  16. Environmental restoration project configuration control

    International Nuclear Information System (INIS)

    Hutterman, L.L.

    1991-01-01

    This paper provides an overview of the approach that Westinghouse Idaho Nuclear Company, Inc. (WINCO) is using for the implementation of the configuration control requirements for a major system acquisition under the guidance of US Department of Energy (DOE) Order 4700.1, open-quotes Project Management System,close quotes for environmental restoration. The two major features of the WINCO environmental restoration approach relate to (1) the product and (2) the maintenance of the baseline for many sites in different phases at the same time. Historically, a project has typically produced a product. Environmental restoration in some ways produces no typical project product. Essentially, what is produced and what configuration control management is exercised on is one of the following: (1) the development of clean dirt, (2) the documentation to support clean dirt, or (3) the track record of each of the sites. It is the latter approach that this paper deals with. This approach is unique in that there are four baselines [cost, schedule, scope, and technical (the track record product)] rather than the typical three. This is essential in configuration management due to the lack of a uniquely identifiable product for each site. Essentially, the philosophy behind the four-part configuration controls allows the technical baseline to fulfill the function typically met by the identifiable product

  17. GENII [Generation II]: The Hanford Environmental Radiation Dosimetry Software System: Volume 3, Code maintenance manual: Hanford Environmental Dosimetry Upgrade Project

    International Nuclear Information System (INIS)

    Napier, B.A.; Peloquin, R.A.; Strenge, D.L.; Ramsdell, J.V.

    1988-09-01

    The Hanford Environmental Dosimetry Upgrade Project was undertaken to incorporate the internal dosimetry models recommended by the International Commission on Radiological Protection (ICRP) in updated versions of the environmental pathway analysis models used at Hanford. The resulting second generation of Hanford environmental dosimetry computer codes is compiled in the Hanford Environmental Dosimetry System (Generation II, or GENII). This coupled system of computer codes is intended for analysis of environmental contamination resulting from acute or chronic releases to, or initial contamination of, air, water, or soil, on through the calculation of radiation doses to individuals or populations. GENII is described in three volumes of documentation. This volume is a Code Maintenance Manual for the serious user, including code logic diagrams, global dictionary, worksheets to assist with hand calculations, and listings of the code and its associated data libraries. The first volume describes the theoretical considerations of the system. The second volume is a Users' Manual, providing code structure, users' instructions, required system configurations, and QA-related topics. 7 figs., 5 tabs

  18. GENII (Generation II): The Hanford Environmental Radiation Dosimetry Software System: Volume 3, Code maintenance manual: Hanford Environmental Dosimetry Upgrade Project

    Energy Technology Data Exchange (ETDEWEB)

    Napier, B.A.; Peloquin, R.A.; Strenge, D.L.; Ramsdell, J.V.

    1988-09-01

    The Hanford Environmental Dosimetry Upgrade Project was undertaken to incorporate the internal dosimetry models recommended by the International Commission on Radiological Protection (ICRP) in updated versions of the environmental pathway analysis models used at Hanford. The resulting second generation of Hanford environmental dosimetry computer codes is compiled in the Hanford Environmental Dosimetry System (Generation II, or GENII). This coupled system of computer codes is intended for analysis of environmental contamination resulting from acute or chronic releases to, or initial contamination of, air, water, or soil, on through the calculation of radiation doses to individuals or populations. GENII is described in three volumes of documentation. This volume is a Code Maintenance Manual for the serious user, including code logic diagrams, global dictionary, worksheets to assist with hand calculations, and listings of the code and its associated data libraries. The first volume describes the theoretical considerations of the system. The second volume is a Users' Manual, providing code structure, users' instructions, required system configurations, and QA-related topics. 7 figs., 5 tabs.

  19. Discussion on the post-project assessment of environmental impact for nuclear facilities

    International Nuclear Information System (INIS)

    Shang Zhaorong

    2013-01-01

    The paper introduces the background of post-project assessment of environmental impact in the world and focuses on the characteristic of environmental impact assessment for Chinese nuclear facilities construction projects, analyzes the necessity, principle and contents of post-project assessment of environmental impact on current Chinese nuclear facilities operation. It is considered that to start the post-project assessment of environmental impact, perfect the post-project assessment mechanism, introduce the post-project assessment into environmental impact assessment system are just at the night time. (author)

  20. The Environmental Control and Life Support System (ECLSS) advanced automation project

    Science.gov (United States)

    Dewberry, Brandon S.; Carnes, Ray

    1990-01-01

    The objective of the environmental control and life support system (ECLSS) Advanced Automation Project is to influence the design of the initial and evolutionary Space Station Freedom Program (SSFP) ECLSS toward a man-made closed environment in which minimal flight and ground manpower is needed. Another objective includes capturing ECLSS design and development knowledge future missions. Our approach has been to (1) analyze the SSFP ECLSS, (2) envision as our goal a fully automated evolutionary environmental control system - an augmentation of the baseline, and (3) document the advanced software systems, hooks, and scars which will be necessary to achieve this goal. From this analysis, prototype software is being developed, and will be tested using air and water recovery simulations and hardware subsystems. In addition, the advanced software is being designed, developed, and tested using automation software management plan and lifecycle tools. Automated knowledge acquisition, engineering, verification and testing tools are being used to develop the software. In this way, we can capture ECLSS development knowledge for future use develop more robust and complex software, provide feedback to the knowledge based system tool community, and ensure proper visibility of our efforts.

  1. Use of the environmental resource management and analysis system at the Fernald Environmental Management Project

    International Nuclear Information System (INIS)

    Erjavec, J.L.

    1992-01-01

    In the past, hazardous waste site characterization and remediation using computer-based technologies has been a difficult and time-consuming process because of the need to analyze data using non-interfaced computer and software environments. The Environmental Resource Management and Analysis System (ERMA) was developed as an innovative approach to the management, analyses and depiction of data collected during a hazardous site remediation. A modular, multi-disciplined software package, ERMA integrates an environmental database management system with variety of Geographic Information System technologies. ERMA capabilities include spatial analysis, three-dimensional subsurface geologic interpretation and modeling, terrain modeling, and groundwater flow and contaminant transport modeling. ERMA's data management is provided through a set of user-modifiable, graphic interface tools that permit complex data queries, data modification and reporting. An ERMA prototype has been implemented at the Fernald Environmental Management Project (a Department of Energy cleanup site) using groundwater monitoring and elevation data collected over the last few years. ERMA has enabled the precision posting of data from the 853 groundwater monitoring wells at the site. Data from these wells have ben used to define the piezometric surface of the Great Miami Aquifer and correlate it with the uranium concentration contours of an identified groundwater plume. Using spatial query capabilities, radioactive sampling results from monitoring wells have been compared to contour maps defining the extent of the plume to determine the validity of those maps and the need for additional well locations

  2. Hanford Environmental Dose Reconstruction Project

    International Nuclear Information System (INIS)

    Finch, S.M.; McMakin, A.H.

    1991-04-01

    The objective of the Hanford Environmental Dose Reconstruction Project is to estimate the radiation doses that populations could have received from nuclear operations at Hanford since 1944. The project is being managed and conducted by the Pacific Northwest Laboratory (PNL) under the direction of an independent Technical Steering Panel (TSP). The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed, from released to impact on humans (dose estimates): source terms; environmental transport; environmental monitoring data; demographics, agriculture, food habits; and, environmental pathways and dose estimates

  3. Advanced Monitoring Systems Initiative Project Achievements for Environmental Restoration and Waste Management

    International Nuclear Information System (INIS)

    Hohman, E.H.; Lohrstorfer, C.L.; Venedam, R.J.; Weeks, S.J.; Fannin, C.R.

    2006-01-01

    The Advanced Monitoring Systems Initiative (AMSI) project has been in existence since 2002. In this short time period, AMSI has successfully developed, tested and/or demonstrated over 30 advanced sensors and monitoring systems for applications in environmental restoration, waste management and other areas of national interest. This presentation summarizes the AMSI project, and gives examples of recent successes. The purpose of the presentation is to make Symposium attendees aware of AMSI's capabilities and experience, for possible use in the future. Example successes include the following: - Automated hexavalent chromium (Cr(VI)) monitoring in wells alongside the Columbia River; - Atmospheric chemical sensor array for remote, real-time plume tracking; - Wireless sensor platform for long-term monitoring of subsurface moisture; - Embedded piezo-resistive micro-cantilever (EPM) units for carbon tetrachloride (CCl 4 ) and hydrogen cyanide (HCN) detection; - 'iHistorian' for efficient, real-time data management of chemical releases. (authors)

  4. Hanford Environmental Dose Reconstruction Project

    International Nuclear Information System (INIS)

    Finch, S.M.; McMakin, A.H.

    1992-06-01

    The objective of the Hanford Environmental Dose Reconstruction Project is to estimate the radiation doses that individuals and populations could have received from nuclear operations at Hanford since 1944. The project is being managed and conducted by the Battelle Pacific Northwest Laboratories under contract with the Centers for Disease Control. The independent Technical Steering Panel (TSP) provides technical direction. The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed, from release to impact on humans (dose estimates): source terms; environmental transport; environmental monitoring data; demography, food consumption, and agriculture; environmental pathways and dose estimates

  5. Management of the Atmosphere Resource Recovery and Environmental Monitoring Project

    Science.gov (United States)

    Roman, Monsi; Perry, Jay; Howard, David

    2013-01-01

    The Advanced Exploration Systems Program's Atmosphere Resource Recovery and Environmental Monitoring (ARREM) project is working to further optimize atmosphere revitalization and environmental monitoring system architectures. This paper discusses project management strategies that tap into skill sets across multiple engineering disciplines, projects, field centers, and industry to achieve the project success. It is the project's objective to contribute to system advances that will enable sustained exploration missions beyond Lower Earth Orbit (LEO) and improve affordability by focusing on the primary goals of achieving high reliability, improving efficiency, and reducing dependence on ground-based logistics resupply. Technology demonstrations are achieved by infusing new technologies and concepts with existing developmental hardware and operating in a controlled environment simulating various crewed habitat scenarios. The ARREM project's strengths include access to a vast array of existing developmental hardware that perform all the vital atmosphere revitalization functions, exceptional test facilities to fully evaluate system performance, and a well-coordinated partnering effort among the NASA field centers and industry partners to provide the innovative expertise necessary to succeed.

  6. Integrating TOM into environmental projects, Angela B. Quinlan

    International Nuclear Information System (INIS)

    Caldwell, J.A.

    1992-01-01

    Responsible and cost-effective waste management and environmental restoration are best achieved when the principles and procedures of Total Quality Management are made an integral part of the process. By describing three case histories, we explore and explain techniques for using TQM in environmental projects. Key aspects considered include: quality measurement systems; establishing and maintaining standard operating procedures; management and technical peer review; the use of Quality Improvement Teams; Roadmapping (a new procedure that the US Department of Energy is incorporating into environmental restoration programs); and the role of audit teams in document production. The three case histories covered include: The Department of Energy's Uranium Mill Tailings Remedial Action Project on which Roadmapping and Quality Improvement Teams have led to significant changes in procedures; the EPA ARCS program on which adoption of project management Standard Operating Procedures enhanced cost and schedule control; the Jacobs Engineering TQM program that emphasizes performance measurement and management and project technical peer review

  7. Alternative techniques for environmental project management

    International Nuclear Information System (INIS)

    Reeves, S.

    1994-01-01

    Beginning in the late 1970s and early 1980s, increased regulation and recognition of ground water as an important natural resource led industry to address subsurface contamination at many sites. This caused the industry's dependence on environmental consultants to increase drastically. Initially, the accepted practice for addressing environmental concerns was to rely upon consultants to determine appropriate work scope, budgets, procedures and regulatory interaction. While significant advances have been made in technology and consulting services, improvement in project management and cost containment have been limited. In order to effectively manage environmental projects, it is imperative that business risks and standardized project management practices be factored into environmental solutions. A standardized environmental project management program was developed and applied to projects at petroleum marketing facilities throughout the United States. Following development and implementation, detailed studies were conducted to measure the value of standardization in reducing costs and enhancing efficiencies. The results indicate significant improvement in both reducing project costs and in enhancing the efficiency of consultants

  8. Evaluation Of The Risk Of Financing Projects Of Environmental Protection

    Directory of Open Access Journals (Sweden)

    Gabriela Cornelia PICIU

    2012-03-01

    Full Text Available The research project approaches multidimensionally the financing of environmental protection from the perspective of directing, correlating and consolidating the financial flows circumscribed to the regeneration of an economy affected by environmental deterioration due to the very activities defining the economic mechanisms and circuits. The purpose of the project is to identify, by scientific, methodological and empirical analysis of the concepts, principles and arguments imposed by the economic theory, the risks of financing the projects of environmental projects and to evaluate their effects because their neglecting, individual approach or erroneous dimensioning might have unfavourable and unforeseen consequences in terms of the efficiency of the environmental strategies and policies. The objective of the study is the reveal the interdependency and interaction between the flows and circuits financing the environmental projects, showing the necessity for punctual, distributive, correlative and multiplicative financing of the environmental protection. This must be done from an expanded and prospective spatial and temporal vision by a compositional approach of the risk for environmental investments within the complex network of the social, economic and financial risks generated by the global system of the human praxis focused on the binomial of the human-environment interdependence.

  9. Hanford Environmental Dose Reconstruction Project

    International Nuclear Information System (INIS)

    Cannon, S.D.; Finch, S.M.

    1992-10-01

    The objective of the Hanford Environmental Dose Reconstruction (HEDR) Project is to estimate the radiation doses that individuals and populations could have received from nuclear operations at Hanford since 1944. The independent Technical Steering Panel (TSP) provides technical direction. The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed from release to impact on humans (dose estimates):Source Terms, Environmental Transport, Environmental Monitoring Data, Demography, Food Consumption, and Agriculture, and Environmental Pathways and Dose Estimates

  10. Life Support Systems: Environmental Monitoring

    Data.gov (United States)

    National Aeronautics and Space Administration — The Advanced Exploration Systems (AES) Life Support Systems project Environmental Monitoring (EM) systems task objectives are to develop and demonstrate onboard...

  11. Environmental issues of the Three Gorges project

    International Nuclear Information System (INIS)

    Fang Ziyun

    1994-01-01

    This article addresses the environmental status of the reservoir area, reservoir characteristics, and the information systems used for assessment of environmental impacts. The Three Gorges Project and the environment are examined in detail and benefits for the Yangtze River's middle reaches, the impact of inundation, and impacts on aquatic animals, human health, natural landscape, cultural relics, water temperature and quality, the river estuary, and the surrounding area are considered. (UK)

  12. Healy Clean Coal Project, Healy, Alaska final Environmental Monitoring Plan

    Energy Technology Data Exchange (ETDEWEB)

    1994-06-14

    This Environmental Monitoring Plan (EMP) provides the mechanism to evaluate the integrated coal combustion/emission control system being demonstrated by the Healy Clean Coal Project (HCCP) as part-of the third solicitation of the US Department of Energy (DOE) Clean Coal Technology Demonstration Program (CCT-III). The EMP monitoring is intended to satisfy two objectives: (1) to develop the information base necessary for identification, assessment, and mitigation of potential environmental problems arising from replication of the technology and (2) to identify and quantify project-specific and site-specific environmental impacts predicted in the National Environmental Policy Act (NEPA) documents (Environmental Impact Statement and Record of Decision). The EMP contains a description of the background and history of development of the project technologies and defines the processes that will take place in the combustion and spray dryer absorber systems, including the formation of flash-calcined material (FCM) and its use in sulfur dioxide (SO{sub 2}) removal from the flue gases. It also contains a description of the existing environmental resources of the project area. The EMP includes two types of environmental monitoring that are to be used to demonstrate the technologies of the HCCP: compliance monitoring and supplemental monitoring. Compliance monitoring activities include air emissions, wastewater effluents, and visibility. Monitoring of these resources provide the data necessary to demonstrate that the power plant can operate under the required state and federal statutes, regulations, and permit requirements.

  13. Richland Environmental Restoration Project Baseline Multi Year Work Plan Volume 1 Richland Environmental Restoration Project Plan

    International Nuclear Information System (INIS)

    Wintczak, T.M.

    2001-01-01

    The purpose of this project specification is to provide an overall scoping and document for the Environmental Restoration project, and to provide a link between the overall Hanford Site scope and the ER project. The purpose of this project specification is to provide an overall scoping document for the ER Project, and to provide a link between the overall Hanford Site scope and the ER Project. Additionally, this specification provides an integrated and consolidated source of information for the Richland ER Project. It identifies the ER Project vision, mission, and goals, as well as the operational history of the Hanford Site, along with environmental setting and hazards. This ER Project Specification is part of the overall ER Project baseline

  14. 233S Decommissioning Project Environmental Control Plan

    International Nuclear Information System (INIS)

    Zoric, J.P.

    2000-01-01

    This Environmental Control Plan is for the 233S Decommissioning activities conducted under the removal action report for the 233S Decontamination and Demolition Project. The purpose of this ECP is to identify environmental requirements for the 233S project. The ECP is a compilation of existing environmental permit conditions, regulatory requirements, and environmental requirements applicable to the specific project or functional activity

  15. Environmental impacts of wind-energy projects

    National Research Council Canada - National Science Library

    Committee on Environmental Impacts of Wind Energy Projects; National Research Council; Division on Earth and Life Studies; National Research Council

    2007-01-01

    .... Environmental Impacts of Wind-Energy Projects offers an analysis of the environmental benefits and drawbacks of wind energy, along with an evaluation guide to aid decision-making about projects...

  16. Project W-314 phase I environmental permits and approvals plan

    International Nuclear Information System (INIS)

    TOLLEFSON, K.S.

    1999-01-01

    This document describes the range of environmental actions, including required permits and other agency approvals, for Project W-314 activities in the Hanford Site's Tank Waste Remediation System. This document outlines alternative approaches to satisfying applicable environmental standards, and describes selected strategies for acquiring permits and other approvals needed for waste feed delivery to proceed. This document also includes estimated costs and schedule to obtain the required permits and approvals based on the selected strategy. It also provides estimated costs for environmental support during design and construction based on the preliminary project schedule provided

  17. Hanford Environmental Dose Reconstruction Project

    International Nuclear Information System (INIS)

    McMakin, A.H.; Cannon, S.D.; Finch, S.M.

    1992-07-01

    The objective of the Hanford Environmental Dose Reconstruction (HEDR) Project is to estimate the radiation doses that individuals and populations could have received from nuclear operations at Hanford since 1944. The TSP consists of experts in environmental pathways, epidemiology, surface-water transport, ground-water transport, statistics, demography, agriculture, meteorology, nuclear engineering, radiation dosimetry, and cultural anthropology. Included are appointed technical members representing the states of Oregon, Washington, and Idaho, a representative of Native American tribes, and an individual representing the public. The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed from release to impact on humans (dose estimates): Source terms, environmental transport, environmental monitoring data, demography, food consumption, and agriculture, and environmental pathways and dose estimates. Progress is discussed

  18. Environmental studies and clearance compliance of Kudankulam Atomic Power Project

    International Nuclear Information System (INIS)

    Agarwal, S.K.; Singh, Jitendra

    2002-01-01

    Full text: Nuclear industry has played a leading role in evolving proper and effective environmental management impact from development practices right form inception thus minimizing the environmental impact from developmental activities of man. In the engineering design of nuclear power plant, safety is further enhanced considerably by providing double back-upped engineered safety systems. Besides the engineered safety, the other factors considered for ensuring environmental impact minimization are siting criteria, conservative rad-waste management, effluent treatment, application of stringent environmental protection standards for limiting waste discharges, an elaborate environmental surveillance program and an on site and off site emergency preparedness plan. Recently, nuclear power industry has taken a drive to develop and implement Environmental Management System (EMS) to all its operating stations in line with ISO-14001 standards. For Kudankulam atomic power project, a number of studies specifically for environmental protection are carried out to meet the requirements of Russian Federation, new guidelines of Ministry of environment and Forests (MOEF) and Atomic Energy Regulatory Board (AERB). In the present paper an attempt has been made to present the environmental management plan and clearance compliance status of the project

  19. Environmental Management Assessment of the Fernald Environmental Management Project (FEMP)

    Energy Technology Data Exchange (ETDEWEB)

    1993-04-01

    This report documents the results of the Environmental Management Assessment performed at the Fernald Environmental Management Project (FEMP) in Fernald, Ohio. During this assessment, the activities conducted by the assessment team included review of internal documents and reports from previous audits and assessments; interviews with US Department of Energy (DOE) and FEMP contractor personnel; and inspection and observation of selected facilities and operations. The onsite portion of the assessment was conducted from March 15 through April 1, 1993, by DOE`s Office of Environmental Audit (EH-24) located within the Office of the Assistant Secretary for Environment, Safety, and Health (EH-1). EH-24 carries out independent assessments of DOE facilities and activities as part of the EH-1 Environment, Safety, and Health (ES&H) Oversight Audit Program. The EH-24 program is designed to evaluate the status of DOE facilities and activities with respect to compliance with Federal, state, and local environmental laws and regulations; compliance with DOE Orders, Guidance and Directives; conformance with accepted industry practices and standards of performance; and the status and adequacy of management systems developed to address environmental requirements. The Environmental Management Assessment of FEMP focused on the adequacy of environmental management systems. Further, in response to requests by the Office of Environmental Restoration and Waste Management (EM) and Fernald Field Office (FN), Quality Assurance and Environmental Radiation activities at FEMP were evaluated from a programmatic standpoint. The results of the evaluation of these areas are contained in the Environmental Protection Programs section in this report.

  20. Environmental Management Assessment of the Fernald Environmental Management Project (FEMP)

    International Nuclear Information System (INIS)

    1993-04-01

    This report documents the results of the Environmental Management Assessment performed at the Fernald Environmental Management Project (FEMP) in Fernald, Ohio. During this assessment, the activities conducted by the assessment team included review of internal documents and reports from previous audits and assessments; interviews with US Department of Energy (DOE) and FEMP contractor personnel; and inspection and observation of selected facilities and operations. The onsite portion of the assessment was conducted from March 15 through April 1, 1993, by DOE's Office of Environmental Audit (EH-24) located within the Office of the Assistant Secretary for Environment, Safety, and Health (EH-1). EH-24 carries out independent assessments of DOE facilities and activities as part of the EH-1 Environment, Safety, and Health (ES ampersand H) Oversight Audit Program. The EH-24 program is designed to evaluate the status of DOE facilities and activities with respect to compliance with Federal, state, and local environmental laws and regulations; compliance with DOE Orders, Guidance and Directives; conformance with accepted industry practices and standards of performance; and the status and adequacy of management systems developed to address environmental requirements. The Environmental Management Assessment of FEMP focused on the adequacy of environmental management systems. Further, in response to requests by the Office of Environmental Restoration and Waste Management (EM) and Fernald Field Office (FN), Quality Assurance and Environmental Radiation activities at FEMP were evaluated from a programmatic standpoint. The results of the evaluation of these areas are contained in the Environmental Protection Programs section in this report

  1. Project W-521, waste feed delivery systems environmental permits and approvals plan

    International Nuclear Information System (INIS)

    TOLLEFSON, K.S.

    1999-01-01

    This document has been prepared to define the specific environmental requirements applicable to Project W-521. The document describes the permits and approvals necessary for the project to design, construct, and install planned upgrades, and provides a schedule of activities and provides cost estimates to complete the required permitting and approval activities

  2. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2005

    International Nuclear Information System (INIS)

    West Valley Nuclear Services Company WVNSCO and URS Group, Inc.

    2006-01-01

    Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2005. The report summarizes calendar year (CY) 2005 environmental monitoring data so as to describe the performance of the WVDP's environmental management system (EMS), confirm compliance with standards and regulations, and highlight important programs

  3. The Environmental Management Project Manager's Handbook for improved project definition

    International Nuclear Information System (INIS)

    1995-02-01

    The United States Department of Energy (DOE) is committed to providing high quality products that satisfy customer needs and are the associated with this goal, DOE personnel must possess the knowledge, skills, and abilities to ensure successful job performance. In addition, there must be recognition that the greatest obstacle to proper project performance is inadequate project definition. Without strong project definition, DOE environmental management efforts are vulnerable to fragmented solutions, duplication of effort, and wastes resources. The primary means of ensuring environmental management projects meet cost and schedule milestones is through a structured and graded approach to project definition, which is the focus of this handbook

  4. West Valley Demonstration Project Annual Site Environmental Report Calendard Year 2005

    Energy Technology Data Exchange (ETDEWEB)

    West Valley Nuclear Services Company (WVNSCO) and URS Group, Inc.

    2006-09-21

    Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2005. The report summarizes calendar year (CY) 2005 environmental monitoring data so as to describe the performance of the WVDP's environmental management system (EMS), confirm compliance with standards and regulations, and highlight important programs.

  5. Hanford Environmental Dose Reconstruction Project monthly report

    International Nuclear Information System (INIS)

    Finch, S.M.

    1990-12-01

    The objective of the Hanford Environmental Dose Reconstruction Project is to estimate the radiation doses that populations could have been have received from nuclear operations at Hanford since 1944. The project is being managed and conducted by the Pacific Northwest Laboratory (PNL) under the direction of an independent Technical Steering Panel (TSP). The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed, from release to impact on humans (dose estimates): source terms; environmental transport; environmental monitoring data; demographics, agriculture, food habits; and environmental pathways and dose estimates. 3 figs., 3 tabs

  6. Environmental standards and project construction: A review

    International Nuclear Information System (INIS)

    Mason, P.F.; Thornberry, H.L.

    1991-01-01

    In the past decade, changes have occurred in the area of environmental regulation. This paper identifies the typical environmental standards applicable to project construction, recent environmental regulatory issues and trends, and identifies new environmental issues which must be considered in project construction. These include (1) handling hazardous chemicals in the workplace, (2) construction at formerly utilized sites, (3) disposal of debris, construction materials and hazardous waste, and (4) training and experience of construction personnel in environmental issues

  7. Project Management in the Field of Innovative Technologies of Environmental Management

    Directory of Open Access Journals (Sweden)

    Potasheva Galina

    2016-01-01

    Full Text Available The article deals with the application of project management in the field of innovative technologies of environmental management. This article examines the sustainability of integrated development environment, and society in the “three ones” concept, which covers all major aspects of development and global change: ecological, social, economic-based planning. But the transition from the national level to the practice of management in the real institutional environment revealed the unresolved systemic issues such as: economic development is considered at the national level; the management of social processes is in the area of responsibility of regions; environmental issues are concentrated at the local, municipal level. To solve this problem, this article discusses the design aspects of environmental management. So in designing the required high degree of understanding of interdependencies and patterns of organizing itself independently of the system that explains the differences between technical and social design. Technical design relies on mechanistic management, while social planning is understood as a system or organic project management. Hence it is safe to state the fact that project management in the environmental management of the country is concentrated in specific design, planning, technical and management solutions, as well as in the creation interested in these effects in all spheres and strata of society.

  8. Environmental impact assessments of the Three Gorges Project in China: Issues and interventions

    Science.gov (United States)

    Xu, Xibao; Tan, Yan; Yang, Guishan

    2013-09-01

    The paper takes China's authoritative Environmental Impact Statement for the Yangzi (Yangtze) Three Gorges Project (TGP) in 1992 as a benchmark against which to evaluate emerging major environmental outcomes since the initial impoundment of the Three Gorges reservoir in 2003. The paper particularly examines five crucial environmental aspects and associated causal factors. The five domains include human resettlement and the carrying capacity of local environments (especially land), water quality, reservoir sedimentation and downstream riverbed erosion, soil erosion, and seismic activity and geological hazards. Lessons from the environmental impact assessments of the TGP are: (1) hydro project planning needs to take place at a broader scale, and a strategic environmental assessment at a broader scale is necessary in advance of individual environmental impact assessments; (2) national policy and planning adjustments need to react quickly to the impact changes of large projects; (3) long-term environmental monitoring systems and joint operations with other large projects in the upstream areas of a river basin should be established, and the cross-impacts of climate change on projects and possible impacts of projects on regional or local climate considered.

  9. Hanford Environmental Dose Reconstruction Project monthly report

    International Nuclear Information System (INIS)

    Finch, S.M.

    1991-10-01

    The objective of the Hanford Environmental Dose Reconstruction Project is to estimate the radiation doeses that individuals and populations could have received from nuclear operations at Hanford since 1944. The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed, from release to impact on humans (dose estimates): Source terms; environmental transport; environmental monitoring data; demographics, agriculture, food habits; environmental pathways and dose estimates

  10. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2006

    International Nuclear Information System (INIS)

    2007-01-01

    Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2006. The report summarizes calendar year (CY) 2006 environmental monitoring data so as to describe the performance of the WVDP's environmental management system (EMS), confirm compliance with standards and regulations, and highlight important programs that protect public health and safety and the environment

  11. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2006

    Energy Technology Data Exchange (ETDEWEB)

    West Valley Nuclear Services Company (WVNSCO) and URS Group, Inc.

    2007-09-27

    Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2006. The report summarizes calendar year (CY) 2006 environmental monitoring data so as to describe the performance of the WVDP’s environmental management system (EMS), confirm compliance with standards and regulations, and highlight important programs that protect public health and safety and the environment.

  12. The school environmental projects inside the planning and the territorial ordering

    International Nuclear Information System (INIS)

    Pablo Emilio Bonilla Luque

    2006-01-01

    The scholastic institutions of the country, must fulfill the established thing in decree 1743 of the 3 of august of 1994, sent by the ministry of national education, forces to that all the establishments of education formal, as much officials as private, in their different levels from pre-student, basic and average, include within their institutional educative projects, scholastic environmental projects within the framework of environmental, local, regional and/or national diagnoses, with a view to helping to the resolution of specific environmental problems. Within this contextual frame the Universidad Libre create inter-institutional project PRAES integrated by its faculties of accountants office, of sciences of the education, and engineering. Through the program of environmental engineering it covers the own technical-practical requirements with the georreferencial frame that implies non-single concerning the cartography aspects, teledetection, photogrammetry and territorial planning, but that coordinates with the department of engineering of systems the development of computer developing of the project, environmentally the geographic boundary in cartography, for all and each one of the educative establishments by UPZ, model applicable to local, regional and national level settles down, the computer science support helps by means of the development of the respective page web from each locality to the diffusion, overcrowded and access of the information, that finally it must allow the establishment of network PRAE of the scholastic environmental projects

  13. Environmental cost of using poor decision metrics to prioritize environmental projects.

    Science.gov (United States)

    Pannell, David J; Gibson, Fiona L

    2016-04-01

    Conservation decision makers commonly use project-scoring metrics that are inconsistent with theory on optimal ranking of projects. As a result, there may often be a loss of environmental benefits. We estimated the magnitudes of these losses for various metrics that deviate from theory in ways that are common in practice. These metrics included cases where relevant variables were omitted from the benefits metric, project costs were omitted, and benefits were calculated using a faulty functional form. We estimated distributions of parameters from 129 environmental projects from Australia, New Zealand, and Italy for which detailed analyses had been completed previously. The cost of using poor prioritization metrics (in terms of lost environmental values) was often high--up to 80% in the scenarios we examined. The cost in percentage terms was greater when the budget was smaller. The most costly errors were omitting information about environmental values (up to 31% loss of environmental values), omitting project costs (up to 35% loss), omitting the effectiveness of management actions (up to 9% loss), and using a weighted-additive decision metric for variables that should be multiplied (up to 23% loss). The latter 3 are errors that occur commonly in real-world decision metrics, in combination often reducing potential benefits from conservation investments by 30-50%. Uncertainty about parameter values also reduced the benefits from investments in conservation projects but often not by as much as faulty prioritization metrics. © 2016 Society for Conservation Biology.

  14. Waste diminution in Construction projects: Environmental Predicaments

    Science.gov (United States)

    Gharehbaghi, Koorosh; Scott-Young, Christina

    2018-03-01

    Waste diminution in construction projects is not only a behavioural issue, but also an energy consumption and reduction concern. With construction waste equating to the significant amount of exhausted energy together with increased pollution, this contributes to a series of environmental predicaments. The overall goal of construction solid Waste Management is to collect, treat and dispose of solid wastes generated by project activities in an environmentally and socially satisfactory manner, using the most economical means available. As cities expand, their construction activities and consumption patterns further drive up the solid waste quantities. Governments are usually authorized to have responsibility for providing solid Waste Management services, and various administrative laws give them exclusive ownership over the waste produced. In addition, construction waste processing can be further controlled and minimized according to specialized authorities such as Environmental Protection Agencies (EPA) and their relevant acts and regulations. Moreover, a Construction Environmental Management Plan (CEMP) can further control the treatment of waste and therefore, reduce the amount produced. Key elements of a CEMP not only include complying with relevant legislation, standards and guidance from the EPA; however, also to ensuring that there are systems in place to resolve any potential problems associated with site activities. Accordingly, as a part of energy consumption and lessening strategies, this paper will discuss various effective waste reduction methods for construction projects. Finally, this paper will also examine tactics to further improve energy efficiency through innovative construction Waste Management strategies (including desirability rating of most favourable options) to promote the lessening of overall CO2production.

  15. Hanford Environmental Information System Configuration Management Plan

    International Nuclear Information System (INIS)

    1996-06-01

    The Hanford Environmental Information System (HEIS) Configuration Management Plan establishes the software and data configuration control requirements for the HEIS and project-related databases maintained within the Environmental Restoration Contractor's data management department

  16. ENVRI PLUS project: Developing an ethical framework for Environmental and Earth System Research Infrastructures

    Science.gov (United States)

    Peppoloni, Silvia; Di Capua, Giuseppe; Haslinger, Florian

    2016-04-01

    ENVRI PLUS is a Horizon 2020 project bringing together Environmental and Earth System Research Infrastructures (RIs), projects and networks with technical specialist partners to create a more coherent, interdisciplinary and interoperable cluster of Environmental Research Infrastructures across Europe (http://www.envriplus.eu/). One theme of the project deals with the societal relevance and understanding, and within that theme an entire work-package (WP) aims at developing an ethical framework for RIs. Objectives of this WP are: • increase the awareness of both the scientists and the public on the importance of ethical aspects in Earth sciences; • establish a shared ethical framework of reference, to be adopted by RIs governing bodies; • increase the awareness of RIs management and operational levels and of the individual involved scientists on their social role in conducting research activities and research work environment; • assess the ethical and social aspects related to the results achieved and deliverables released within the project. The ongoing activities include: • reviewing the state of art on ethical issues useful for the goals of the project (collection and analysis of materials already existing within scientific organizations, institutions all over the world); • the creation of a questionnaire, through which to investigate how each RI participating in ENVRI PLUS faces ethical issues in relation to its activities, and so to understand the level of perception that researchers and technicians involved in the project have on the ethical implications of their scientific activities; • the definition of ethics guidelines to be used by partners for building their policies and their own codes of conduct; • the elaboration of an ethical label template to characterize each product of the project, that partners will be able to use in order to give essential information about the ethical and social implications of their products; • the

  17. A bar coding system for environmental projects

    International Nuclear Information System (INIS)

    Barber, R.B.; Hunt, B.J.; Burgess, G.M.

    1988-01-01

    This paper presents BeCode systems, a bar coding system which provides both nuclear and commercial clients with a data capture and custody management program that is accurate, timely, and beneficial to all levels of project operations. Using bar code identifiers is an essentially paperless and error-free method which provides more efficient delivery of data through its menu card-driven structure, which speeds collection of essential data for uploading to a compatible device. The effects of this sequence include real-time information for operator analysis, management review, audits, planning, scheduling, and cost control

  18. The Environmental and Molecular Sciences Laboratory project -- Continuous evolution in leadership

    International Nuclear Information System (INIS)

    Knutson, D.E.; McClusky, J.K.

    1994-10-01

    The Environmental and Molecular Sciences Laboratory (EMSL) construction project at Pacific Northwest Laboratory (PNL) in Richland, Washington, is a $230M Major Systems Acquisition for the US Department of Energy (DOE). The completed laboratory will be a national user facility that provides unparalleled capabilities for scientists involved in environmental molecular science research. This project, approved for construction by the Secretary of Energy in October 1993, is underway. The United States is embarking on an environmental cleanup effort that dwarfs previous scientific enterprise. Using current best available technology, the projected costs of cleaning up the tens of thousands of toxic waste sites, including DOE sites, is estimated to exceed one trillion dollars. The present state of scientific knowledge regarding the effects of exogenous chemicals on human biology is very limited. Long term environmental research at the molecular level is needed to resolve the concerns, and form the building blocks for a structure of cost effective process improvement and regulatory reform

  19. The Environmental and Molecular Sciences Laboratory project -- Continuous evolution in leadership

    Energy Technology Data Exchange (ETDEWEB)

    Knutson, D.E.; McClusky, J.K.

    1994-10-01

    The Environmental and Molecular Sciences Laboratory (EMSL) construction project at Pacific Northwest Laboratory (PNL) in Richland, Washington, is a $230M Major Systems Acquisition for the US Department of Energy (DOE). The completed laboratory will be a national user facility that provides unparalleled capabilities for scientists involved in environmental molecular science research. This project, approved for construction by the Secretary of Energy in October 1993, is underway. The United States is embarking on an environmental cleanup effort that dwarfs previous scientific enterprise. Using current best available technology, the projected costs of cleaning up the tens of thousands of toxic waste sites, including DOE sites, is estimated to exceed one trillion dollars. The present state of scientific knowledge regarding the effects of exogenous chemicals on human biology is very limited. Long term environmental research at the molecular level is needed to resolve the concerns, and form the building blocks for a structure of cost effective process improvement and regulatory reform.

  20. Joint verification project on environmentally friendly coal utilization systems. Joint verification project on the water-saving coal preparation system; Kankyo chowagata sekitan riyo system kyodo jissho jigyo. Shosuigata sentan system kyodo jissho jigyo

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    In this verification project, clean technology which should be spread in China was verified and the base structure for its spread was prepared for the purpose of controlling emissions of environmental pollutants associated with the coal utilization in China and of contributing to secure energy acquisition of Japan. As joint verification projects, a general rehabilitation type coal preparation system was installed in the Wangfenggang coal preparation plant, and a central control coal preparation system was installed in the Qingtan coal preparation plant. In the former, a system is verified in which optimum operation, water-saving, high quality, and heightening of efficiency can be obtained by introducing two computing systems for operation control and quality control, various measuring instruments, and analyzers to coal preparation plants where analog operation is conducted helped by Russia and Porland and have problems about quality control. In the latter, a central control system achieving water saving is verified by introducing rapid ash meters, scales, desitometers and computers to coal preparation plants having zigzag or heavy-fluid cyclon and connecting various kinds of information through network. For fiscal 1994, investigation and study were conducted. 51 figs., 9 tabs.

  1. Environmental monitoring for the DOE coolside and LIMB demonstration extension projects

    International Nuclear Information System (INIS)

    White, T.; Contos, L.

    1991-09-01

    The purpose of this document is to present environmental monitoring data collected during the US Department of Energy Limestone Injection Multistage Burner (DOE LIMB) Demonstration Project Extension at the Ohio Edison Edgewater Generating Station in Lorain, Ohio. These data were collected by implementing the Environmental Monitoring Plan (EMP) for the DOE LIMB Demonstration Project Extension, dated August 1988. This document is the fifth EMP status report to be published and presents the data generated during November and December 1990, and January 1991. These reports review a three or four month period and have been published since the project's start in October 1989. The DOE project is an extension of the US Environmental Protection Agency's (EPA) original LIMB Demonstration. The program is operated under DOE's Clean Coal Technology Program of ''emerging clean coal technologies'' under the categories of ''in boiler control of oxides of sulfur and nitrogen'' as well as ''post-combustion clean-up.'' The objective of the LIMB program is to demonstrate the sulfur dioxide (SO 2 ) and nitrogen oxide (NO x ) emission reduction capabilities of the LIMB system. The LIMB system is a retrofit technology to be used for existing coal-fired boilers equipped with electrostatic precipitators (ESPs). 5 figs., 12 tabs

  2. Evaluation of environmental impact assessment system in Pakistan

    International Nuclear Information System (INIS)

    Nadeem, Obaidullah; Hameed, Rizwan

    2008-01-01

    Environmental impact assessment (EIA) was first introduced in Pakistan based on the Environmental Protection Ordinance 1983. The EIA process was further strengthened under the Pakistan Environmental Protection Act 1997, which became operational under EIA Regulations 2000. Despite a sound legal basis and comprehensive guidelines, evidence suggests that EIA has not yet evolved satisfactorily in Pakistan. An evaluation of the EIA system against systematic evaluation criteria, based on interviews with EIA approval authorities, consulting firms and experts, reveals various shortcomings of the EIA system. These mainly include; inadequate capacity of EIA approval authorities, deficiencies in screening and scoping, poor EIA quality, inadequate public participation and weak monitoring. Overall, EIA is used presently as a project justification tool rather than as a project planning tool to contribute to achieving sustainable development. Whilst shortcomings are challenging, central government has recently shown a high degree of commitment to the environmental protection by making EIA compulsory for all the public sector projects likely to have adverse environmental impacts. The paper identifies opportunities for taking advantage of the current environment for strengthening the EIA process

  3. The scholastic environmental projects inside of the planning and the territorial ordering

    International Nuclear Information System (INIS)

    Bonilla Luque, Pablo Emilio

    2005-01-01

    The scholastic institutions of the country, must fulfill the established thing in decree 1743 of the 3 of august of 1994, sent by the ministry of national education, forces to that all the establishments of education formal, as much officials as private, in their different levels from pre-student, basic and average, include within their institutional educative projects, scholastic environmental projects within the framework of environmental, local, regional and/or national diagnoses, with a view to helping to the resolution of specific environmental problems. Within this contextual frame the Universidad Libre create inter-institutional project PRAES integrated by its faculties of accountants office, of sciences of the education, and engineering. Through the program of environmental engineering it covers the own technical-practical requirements with the georreferencial frame that implies non-single concerning the cartography aspects, teledetection, photogrammetry and territorial planning, but that coordinates with the department of engineering of systems the development of computer Developing of the project, environmentally the geographic boundary in cartography, for all and each one of the educative establishments by UPZ, model applicable escalarmente to local regional and national level settles down, the computer science support helps by means of the development of the respective page web from each locality to the diffusion, overcrowded and access of the information, that finally it must allow the establishment of network PRAE of the scholastic environmental projects

  4. Dynamic simulation applied to the socio-environmental management in projects of concentrated infrastructure

    International Nuclear Information System (INIS)

    Diaz E, Mauricio; Pena Z, Gloria Elena

    2004-01-01

    This work presents a theoretical and methodological approach to system dynamics utilization to contribute in the comprehension and handle of complexly of management challenges what appears in design, construction and operation phases in concentrate infrastructure projects like as ports, big dams and industrial parks. The localization of this kind of projects generates socio environmental impacts in their influence zones, what requires a strategically management from enterprise owners, not only for to comply with current environmental laws but also ensure social viability of their projects

  5. Uranium Mill Tailings Remedial Action Project 1993 Environmental Report

    Energy Technology Data Exchange (ETDEWEB)

    1994-10-01

    This annual report documents the Uranium Mill Tailing Remedial Action (UMTRA) Project environmental monitoring and protection program. The UMTRA Project routinely monitors radiation, radioactive residual materials, and hazardous constituents at associated former uranium tailings processing sites and disposal sites. At the end of 1993, surface remedial action was complete at 10 of the 24 designated UMTRA Project processing sites. In 1993 the UMTRA Project office revised the UMTRA Project Environmental Protection Implementation Plan, as required by the US DOE. Because the UMTRA Project sites are in different stages of remedial action, the breadth of the UMTRA environmental protection program differs from site to site. In general, sites actively undergoing surface remedial action have the most comprehensive environmental programs for sampling media. At sites where surface remedial action is complete and at sites where remedial action has not yet begun, the environmental program consists primarily of surface water and ground water monitoring to support site characterization, baseline risk assessments, or disposal site performance assessments.

  6. Uranium Mill Tailings Remedial Action Project 1993 Environmental Report

    International Nuclear Information System (INIS)

    1994-10-01

    This annual report documents the Uranium Mill Tailing Remedial Action (UMTRA) Project environmental monitoring and protection program. The UMTRA Project routinely monitors radiation, radioactive residual materials, and hazardous constituents at associated former uranium tailings processing sites and disposal sites. At the end of 1993, surface remedial action was complete at 10 of the 24 designated UMTRA Project processing sites. In 1993 the UMTRA Project office revised the UMTRA Project Environmental Protection Implementation Plan, as required by the US DOE. Because the UMTRA Project sites are in different stages of remedial action, the breadth of the UMTRA environmental protection program differs from site to site. In general, sites actively undergoing surface remedial action have the most comprehensive environmental programs for sampling media. At sites where surface remedial action is complete and at sites where remedial action has not yet begun, the environmental program consists primarily of surface water and ground water monitoring to support site characterization, baseline risk assessments, or disposal site performance assessments

  7. TidGen Power System Commercialization Project

    Energy Technology Data Exchange (ETDEWEB)

    Sauer, Christopher R. [President & CEO; McEntee, Jarlath [VP Engineering & CTO

    2013-12-30

    ORPC Maine, LLC, a wholly-owned subsidiary of Ocean Renewable Power Company, LLC (collectively ORPC), submits this Final Technical Report for the TidGen® Power System Commercialization Project (Project), partially funded by the U.S. Department of Energy (DE-EE0003647). The Project was built and operated in compliance with the Federal Energy Regulatory Commission (FERC) pilot project license (P-12711) and other permits and approvals needed for the Project. This report documents the methodologies, activities and results of the various phases of the Project, including design, engineering, procurement, assembly, installation, operation, licensing, environmental monitoring, retrieval, maintenance and repair. The Project represents a significant achievement for the renewable energy portfolio of the U.S. in general, and for the U.S. marine hydrokinetic (MHK) industry in particular. The stated Project goal was to advance, demonstrate and accelerate deployment and commercialization of ORPC’s tidal-current based hydrokinetic power generation system, including the energy extraction and conversion technology, associated power electronics, and interconnection equipment capable of reliably delivering electricity to the domestic power grid. ORPC achieved this goal by designing, building and operating the TidGen® Power System in 2012 and becoming the first federally licensed hydrokinetic tidal energy project to deliver electricity to a power grid under a power purchase agreement in North America. Located in Cobscook Bay between Eastport and Lubec, Maine, the TidGen® Power System was connected to the Bangor Hydro Electric utility grid at an on-shore station in North Lubec on September 13, 2012. ORPC obtained a FERC pilot project license for the Project on February 12, 2012 and the first Maine Department of Environmental Protection General Permit issued for a tidal energy project on January 31, 2012. In addition, ORPC entered into a 20-year agreement with Bangor Hydro Electric

  8. Do environmental projects promote gender equity?

    Science.gov (United States)

    Joekes, S

    1995-02-01

    In the 1980s, governments and development agencies began to recognize the need to consider gender issues in their environmental and natural resource management programs. First came the understanding that women play a vital role in the management of natural resources and often have a strong traditional and contemporary knowledge of their environment. To exclude them would damage the efficacy of any project. Next, donor agencies came to view women, in their roles as environmental managers, as vulnerable victims of and contributors to environmental degradation. When awareness grew of examples of women successfully fighting to conserve local resources, women were considered important local assets to be used in efforts toward better environmental management. New environmental projects began by asking whether the protected resource was used by men or women in order to target the crucial people. For example, when planning to preserve forests, it is useful to recognize that men typically use wood for construction and fencing, while women use it for cooking fires. It has become increasingly common for women to participate in water and sanitation committees. But good intentions have often been subverted. Community level management of environmental projects does not guarantee female participation. Sometimes involving women means that women do all the physical labor without receiving their fair share of the benefits. In areas where women's property rights are restricted, women will have little authority in resource management. Legal reforms are needed, but they must be complemented at the local level by collective action.

  9. Environmental education essentials for project designers in Angola

    Directory of Open Access Journals (Sweden)

    Mbongo Mpaxi

    2015-05-01

    Full Text Available The article provides a selection of essential contents supporting environmental education of project designers in Angola. To attain such objective knowledge; abilities and values to be pursued are listed. The selection was completed by means of a thorough inquire based on the application of analysis and synthesis, historical, logical, inductive, deductive and system methods. The need of Angolan builders of knowing the environmental mpact of constructions is backed up. At the same time, the professional abilities allowing the future graduates to contribute o the preservation of environment during the stages of design, construction, exploitation and demolition of buildings is described.

  10. The GIIDA (Management of the CNR Environmental Data for Interoperability) project

    Science.gov (United States)

    Nativi, S.

    2009-04-01

    This work presents the GIIDA (Gestione Integrata e Interoperativa dei Dati Ambientali del CNR) inter-departimental project of the Italian National Research Council (CNR). The project is an initiative of the Earth and Environment Department (Dipartimento Terra e Ambiente) of the CNR. GIIDA mission is "To implement the Spatial Information Infrastructure (SII) of CNR for Environmental and Earth Observation data". The project aims to design and develop a multidisciplinary cyber-infrastructure for the management, processing and evaluation of Earth and environmental data. This infrastructure will contribute to the Italian presence in international projects and initiatives, such as: INSPIRE, GMES, GEOSS and SEIS. The main GIIDA goals are: • Networking: To create a network of CNR Institutes for implementing a common information space and sharing spatial resources. • Observation: Re-engineering the environmental observation system of CNR • Modeling: Re-engineering the environmental modeling system del CNR • Processing: Re-engineering the environmental processing system del CNR • Mediation: To define mediation methods and instruments for implementing the international interoperability standards. The project started in July 2008 releasing a specification document of the GIIDA architecture for interoperability and security. Based on these documents, a Call for Proposals was issued in September 2008. GIIDA received 23 proposed pilots from 16 different Institutes belonging to five CNR Departments and from 15 non-CNR Institutions (e.g. three Italian regional administrations, three national research centers, four universities, some SMEs). These pilot were divided into thematic areas. In fact, GIIDA considers seven main thematic areas/domains: • Biodiversity; • Climate Changes; • Air Quality; • Soil and Water Quality; • Risks; • Infrastructures for Research and Public Administrations; • Sea and Marine resources Each of these thematic areas is covered by a

  11. Translation of environmental leadership objectives into routine project execution for the uranium mining industry

    International Nuclear Information System (INIS)

    Breker, J.; Studer, T.; Voykin, N.; Berg, B.; Scott, W.

    2010-01-01

    Cameco Corporation (Cameco) aligns its social and environmental responsibilities with its vision, mission and values. Environmental Leadership is established as a corporate objective that emphasizes the triple-bottom-line and a systematic approach to understanding environmental, social and economic issues, risks and opportunities. These are ingrained in the project culture, systems and processes and used to influence solutions derived by the project teams to achieve Cameco's objectives. This paper traces the organizational objectives from the early stages of a project through to implementation and turn over to Operations. A case study is used to demonstrate how an asset is influenced by Cameco's strategy. (author)

  12. Translation of environmental leadership objectives into routine project execution for the uranium mining industry

    Energy Technology Data Exchange (ETDEWEB)

    Breker, J.; Studer, T.; Voykin, N.; Berg, B., E-mail: jeremy_breker@cameco.com [Cameco Corp., Saskatoon, SK (Canada); Scott, W. [Wardrop Engineering, Thunder Bay, ON (Canada)

    2010-07-01

    Cameco Corporation (Cameco) aligns its social and environmental responsibilities with its vision, mission and values. Environmental Leadership is established as a corporate objective that emphasizes the triple-bottom-line and a systematic approach to understanding environmental, social and economic issues, risks and opportunities. These are ingrained in the project culture, systems and processes and used to influence solutions derived by the project teams to achieve Cameco's objectives. This paper traces the organizational objectives from the early stages of a project through to implementation and turn over to Operations. A case study is used to demonstrate how an asset is influenced by Cameco's strategy. (author)

  13. Blue Bahia: an environmental sanitation project

    International Nuclear Information System (INIS)

    Azcona, Miguel Angel L.; Neuvirth, Bruno

    1996-01-01

    The paper presents actions developed to incorporate some aspects of environmental sanitation to the basic sanitation project, natural resources assessing, identification of the environmental degradation sources - in addition to those caused by lack of basic sanitation, and common action between public and private sectors

  14. Criteria for classification of competitive housing projects in terms of their environmental friendliness

    Science.gov (United States)

    Nezhnikova, Ekaterina

    2017-10-01

    This article deals with social and economic essence of strategy of the housing industry development, both complex system of economic relations in field of production and consumption, which is regulated through the mechanism of prices and implemented through formation and realization of priority directions. Developed criteria for classification of housing construction projects as environmentally friendly and the quality criteria of variables for assessment of the environmental friendliness of residential buildings allowed to determine the ways of development of the industry on the basis of creation of competitive projects in interrelation with quality, environmental friendliness and price of consumption.

  15. Project management plan for the Isotopes Facilities Deactivation Project at Oak Ridge National Laboratory. Environmental Restoration Program

    International Nuclear Information System (INIS)

    1995-01-01

    The purpose of the Isotopes Facilities Deactivation Project (IFDP) is to place nineteen former isotopes production facilities at the Oak Ridge National Laboratory in a safe, stable, and environmentally sound condition suitable for an extended period of minimum surveillance and maintenance (S ampersand M) and as quickly and economically as possible. Implementation and completion of the deactivation project win further reduce the already small risks to the environment and to public safety and health. Furthermore, the project should result in significant S ampersand M cost savings in the future. The IFDP management plan has been prepared to document the project objectives, define organizational relationships and responsibilities, and outline the management control systems to be employed in the management of the project. The project has adopted a strategy to deactivate the simple facilities first, to reduce the scope of the project, and to gain experience before addressing more difficult facilities. A decision support system is being developed to identify those activities that best promote the project mission and result in largest cost savings. The Work Plan for the Isotopes Facilities Deactivation Project at Oak Ridge National Laboratory (Energy Systems 1994) defines the project schedule, the cost estimate, and the technical approach for the project

  16. Independent technical review of the Sandia National Laboratories Environmental Restoration Project

    International Nuclear Information System (INIS)

    1994-11-01

    An Independent Technical Review was conducted of the Environmental Restoration Project. The objective of the review was recommendations, from a commercial perspective, on a systems level path forward to safe, minimum cost and schedule project completion. The work presented represents the consensus analysis and recommendations of thirteen individuals with varied backgrounds, expertise, and experience. The ITR team recommends that the barriers to the opportunity described in the diagnosis be eliminated using an integrated DOE-Sandia system approach. Piecemeal changes will not result in the desired commercial efficiency. DOE needs to operate as the contracting agency for a Major System Acquisition. If it does not, commercial performance will not be achieved regardless of the contractor. Likewise, Sandia needs to establish and implement the necessary project structure and management systems to operate with commercial contractor like efficiency

  17. Richland Environmental Restoration Project management action process document

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-04-01

    This document is the prescribed means for providing direct input to the US Department of Energy Headquarters regarding the status, accomplishments, strategy, and issues of the Richland Environmental Restoration Project. The project mission, organizational interfaces, and operational history of the Hanford Site are provided. Remediation strategies are analyzed in detail. The document includes a status of Richland Environmental Restoration project activities and accomplishments, and it presents current cost summaries, schedules, and technical baselines.

  18. Richland Environmental Restoration Project management action process document

    International Nuclear Information System (INIS)

    1996-04-01

    This document is the prescribed means for providing direct input to the US Department of Energy Headquarters regarding the status, accomplishments, strategy, and issues of the Richland Environmental Restoration Project. The project mission, organizational interfaces, and operational history of the Hanford Site are provided. Remediation strategies are analyzed in detail. The document includes a status of Richland Environmental Restoration project activities and accomplishments, and it presents current cost summaries, schedules, and technical baselines

  19. Hanford Environmental Dose Reconstruction Project monthly report

    International Nuclear Information System (INIS)

    McMakin, A.H., Cannon, S.D.; Finch, S.M.

    1992-09-01

    The objective of the Hanford Environmental Dose Reconstruction MDR) Project is to estimate the radiation doses that individuals and populations could have received from nuclear operations at Hanford since 1944. The TSP consists of experts in envirorunental pathways. epidemiology, surface-water transport, ground-water transport, statistics, demography, agriculture, meteorology, nuclear engineering. radiation dosimetry. and cultural anthropology. Included are appointed members representing the states of Oregon, Washington, and Idaho, a representative of Native American tribes, and an individual representing the public. The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed from release to impact on humans (dose estimates): Source Terms; Environmental Transport; Environmental Monitoring Data Demography, Food Consumption, and Agriculture; and Environmental Pathways and Dose Estimates

  20. The Hanford Environmental Dose Reconstruction Project: Overview

    International Nuclear Information System (INIS)

    Haerer, H.A.; Freshley, M.D.; Gilbert, R.O.; Morgan, L.G.; Napier, B.A.; Rhoads, R.E.; Woodruff, R.K.

    1990-01-01

    In 1988, researchers began a multiyear effort to estimate radiation doses that people could have received since 1944 at the U.S. Department of Energy's Hanford Site. The study was prompted by increasing concern about potential health effects to the public from more than 40 yr of nuclear activities. We will provide an overview of the Hanford Environmental Dose Reconstruction Project and its technical approach. The work has required development of new methods and tools for dealing with unique technical and communication challenges. Scientists are using a probabilistic, rather than the more typical deterministic, approach to generate dose distributions rather than single-point estimates. Uncertainties in input parameters are reflected in dose results. Sensitivity analyses are used to optimize project resources and define the project's scope. An independent technical steering panel directs and approves the work in a public forum. Dose estimates are based on review and analysis of historical data related to operations, effluents, and monitoring; determination of important radionuclides; and reconstruction of source terms, environmental conditions that affected transport, concentrations in environmental media, and human elements, such as population distribution, agricultural practices, food consumption patterns, and lifestyles. A companion paper in this volume, The Hanford Environmental Dose Reconstruction Project: Technical Approach, describes the computational framework for the work

  1. The environmental cost in the mining projects

    International Nuclear Information System (INIS)

    Gaviria Rivera Antonio

    1992-01-01

    To evaluate and calculate the mining project, Environmental costs, besides the proper variables concerning the project. It is necessary to incorporate the distinct interrelations among the mining operation with the local and regional biophysics and. socio-economic environments existing in the project's area of influence

  2. Field verification of social and environmental issues of selected water sector projects in Punjab-Pakistan

    International Nuclear Information System (INIS)

    Ayesha, A.

    2012-01-01

    Irrigation helps in increasing the agricultural yield and the irrigation projects are carried out for the welfare of people. The importance of environment for sustainable development of irrigation projects has been realized. Environmental Impact Assessment is being increasingly used as a tool for appropriate environmental planning. In Pakistan, PEP A (Pakistan Environmental Protection Act),1997 establishes the framework to carry out Environmental Assessment of development projects. Various national and international agencies have developed Environmental Assessment Guidelines and Checklists for systematic evaluation of environmental impacts and their mitigation. The Social and Environmental Management Unit of Punjab Irrigation and Drainage Authority developed checklist for assessment of irrigation projects in 2007. The present study was conducted on three water sector projects namely: Concrete Lining of Dhudi Minor, Improving Nikki Deg Drain System and Rehabilitation of Khanki Barrage. The field verification of social and environmental issues of the projects was carried out according to the checklist of Social and Environmental Management Unit. The most noticeable impacts which were identified include: extended canal closure, emissions and effluents, waste generation and disposal, effect on flora, public health and safety, land acquisition, and social issues. The mitigatory measures proposed: proper project scheduling to minimize the canal closure periods, waste disposal through proper planning, preparation of detailed resettlement action plans and compensation, location of labor camps away from the settlements, avoiding unnecessary cutting of trees, and deployed machinery should be in good working condition. The recommendations of the study are to review and improve the checklists through a gradual and phased process into a more comprehensive social and environmental assessment process; capacity building of all the stake holders; collaboration between different

  3. Griffith energy project draft environmental impact statement

    International Nuclear Information System (INIS)

    1998-10-01

    Griffith Energy Limited Liability Corporation (Griffith) proposes to construct and operate the Griffith Energy Project (Project), a natural gas-fired, combined cycle power plant, on private lands south of Kingman, Arizona. The Project would be a merchant plant which means that it is not owned by a utility and there is currently no long-term commitment or obligation by any utility to purchase the capacity and energy generated by the power plant. Griffith applied to interconnect its proposed power plant with the Western Area Power Administration's (Western) Pacific Northwest-Pacific Southwest Intertie and Parker-Davis transmission systems. Western, as a major transmission system owner, needs to provide access to its transmission system when it is requested by an eligible organization per existing policies, regulations and laws. The proposed interconnection would integrate the power generated by the Project into the regional transmission grid and would allow Griffith to supply its power to the competitive electric wholesale market. Based on the application, Western's proposed action is to enter into an interconnection and construction agreement with Griffith for the requested interconnections. The proposed action includes the power plant, water wells and transmission line, natural gas pipelines, new electrical transmission lines and a substation, upgrade of an existing transmission line, and access road to the power plant. The existing environmental resource conditions in the Project area and the potential impacts on the resources by the proposed action and alternatives are described. Construction of segments of the transmission lines and a proposed natural gas pipeline also require a grant of right-of-way across Federal lands administered by the Bureau of Land Management

  4. Assessing Environmental Impact Indicators in Road Construction Projects in Developing Countries

    Directory of Open Access Journals (Sweden)

    Mohamed Marzouk

    2017-05-01

    Full Text Available Environmental pollution is considered to be one of the main concerns in the construction industry. Environmental pollution has become a major challenge to construction projects due to the huge amount of pollution caused by construction projects. There are different types of environmental impact indicators, such as the greenhouse gas (GHG footprint, eutrophication potential (EP, acidification potential (AP, human health (HH particulate, ozone depletion, and smog. Each of these environmental impact indicators can be linked to different phases of the construction projects. The overall environmental impact indicators can be divided into direct, indirect, and operational emissions. This paper presents a Building Information Modeling (BIM-based methodology for the assessment of environmental impacts in road construction projects. The model takes into account the overall life cycle of the road construction project, which is divided into: manufacturing phase, transportation phase, construction phase, maintenance phase, operational phase, recycling phase, and deconstruction phase. A case study is presented to demonstrate the applicability of the proposed model. The proposed model solves a major problem for road construction project teams who want to assess the environmental impact indicators associated with their project prior to the start of the execution of their projects.

  5. Hanford Environmental Dose Reconstruction Project monthly report, August 1992

    International Nuclear Information System (INIS)

    McMakin, A.H.; Cannon, S.D.; Finch, S.M.

    1992-01-01

    The objective of the Hanford Environmental Dose Reconstruction (HEDR) Project is to estimate the radiation doses that individuals and populations could have received from nuclear operations at Hanford since 1944. The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed from release to impact on humans (dose estimates): source terms; environmental transport; environmental monitoring data; demography; food consumption; and agriculture; and environmental pathway and dose estimates

  6. Klickitat Cogeneration Project: Final environmental assessment

    International Nuclear Information System (INIS)

    1994-09-01

    To meet BPA's contractual obligation to supply electrical power to its customers, BPA proposes to acquire power generated by Klickitat Cogeneration Project. BPA has prepared an environmental assessment evaluating the proposed project. Based on the EA analysis, BPA's proposed action is not a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act of 1969 for the following reasons: (1)it will not have a significant impact land use, upland vegetation, wetlands, water quality, geology, soils, public health and safety, visual quality, historical and cultural resources, recreation and socioeconomics, and (2) impacts to fisheries, wildlife resources, air quality, and noise will be temporary, minor, or sufficiently offset by mitigation. Therefore, the preparation of an environmental impact statement is not required and BPA is issuing this FONSI (Finding of No Significant Impact)

  7. Klickitat Cogeneration Project : Final Environmental Assessment.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration; Klickitat Energy Partners

    1994-09-01

    To meet BPA`s contractual obligation to supply electrical power to its customers, BPA proposes to acquire power generated by Klickitat Cogeneration Project. BPA has prepared an environmental assessment evaluating the proposed project. Based on the EA analysis, BPA`s proposed action is not a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act of 1969 for the following reasons: (1)it will not have a significant impact land use, upland vegetation, wetlands, water quality, geology, soils, public health and safety, visual quality, historical and cultural resources, recreation and socioeconomics, and (2) impacts to fisheries, wildlife resources, air quality, and noise will be temporary, minor, or sufficiently offset by mitigation. Therefore, the preparation of an environmental impact statement is not required and BPA is issuing this FONSI (Finding of No Significant Impact).

  8. Poplar Island Environmental Restoration Project Nekton Data

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The Poplar Island Environmental Restoration Project (PIERP) is a large scale 1,800 acres restoration project located in mid Chesapeake Bay. Fishery collections are...

  9. The Project-Approach to GIS as an Integrative Classroom Technology: An Environmental Case Study.

    Science.gov (United States)

    Gatrell, Jay D.; Oshiro, Kenji K.

    2001-01-01

    Explains how Geographic Information Systems (GIS) influences geography curricula and how project-based learning can be applied to GIS experiences. Introduces a project investigating non-geography college students' design and implementation of a environmental GIS application. (Contains 16 references.) (YDS)

  10. Understanding large social-ecological systems: introducing the SESMAD project

    Directory of Open Access Journals (Sweden)

    Michael Cox

    2014-08-01

    Full Text Available This article introduces the Social-ecological systems meta-analysis database (SESMAD project, which is the project behind the case studies and synthetic articles contained in this special issue of the International Journal of the Commons. SESMAD is an internationally collaborative meta-analysis project that builds on previous seminally synthetic work on small-scale common-pool resource systems conducted at the Workshop in Political Theory and Policy Analysis at Indiana University. This project is guided by the following research question: can the variables found to be important in explaining outcomes on small-scale systems be scaled up to explain outcomes in large-scale environmental governance? In this special issue we report on our findings thus far through a set of case studies of large-scale environmental governance, a paper that describes our conceptual advances, and a paper that compares these five case studies to further examine our central research question.

  11. Coherent Energy and Environmental System Analysis

    DEFF Research Database (Denmark)

    Hvelplund, Frede Kloster; Mathiesen, Brian Vad; Østergaard, Poul Alberg

    This report presents a summary of results of the strategic research project “Coherent Energy and Environmental System Analysis” (CEESA) which was conducted in the period 2007-2011 and funded by the Danish Strategic Research Council together with the participating parties. The project...... was interdisciplinary and involved more than 20 researchers from 7 different university departments or research institutions in Denmark. Moreover, the project was supported by an international advisory panel. The results include further development and integration of existing tools and methodologies into coherent...

  12. Environmental auditing for oil drilling projects

    International Nuclear Information System (INIS)

    Zambrano Solarte, Hugo Ibsen; Olaya Amaya, Alfredo

    2003-01-01

    The enforcement of legal regulations on the environment requires some mechanisms related to preservation and conservation of natural resources, as well as paleontological and archaeological wealth, in order to allow their use without endangering their integrity. This article reviews legal regulations, activities and performance indicators, which should be taken into account by Environmental Auditors in oil projects. Additionally, a Plan for Environmental management is analyzed with its main components and procedures for performing the environmental auditing

  13. The Contribution of Project Environmental Assessment to Assessing and Managing Cumulative Effects: Individually and Collectively Insignificant?

    Science.gov (United States)

    Noble, Bram; Liu, Jialang; Hackett, Paul

    2017-04-01

    This paper explores the opportunities and constraints to project-based environmental assessment as a means to support the assessment and management of cumulative environmental effects. A case study of the hydroelectric sector is used to determine whether sufficient information is available over time through project-by-project assessments to support an adequate understanding of cumulative change. Results show inconsistency from one project to the next in terms of the components and indicators assessed, limited transfer of baseline information between project assessments over time, and the same issues and concerns being raised by review panels-even though the projects reviewed are operating in the same watershed and operated by the same proponent. Project environmental assessments must be managed, and coordinated, as part of a larger system of impact assessment, if project-by-project assessments are to provide a meaningful forum for learning and understanding cumulative change. The paper concludes with recommendations for improved project-based assessment practice in support of cumulative effects assessment and management.

  14. Methodology for measuring environmental health within Europe. Health Risk from Environmental Pollution Levels in Urban Systems (HEREPLUS

    Directory of Open Access Journals (Sweden)

    Anja Zscheppang

    2008-12-01

    Full Text Available

    Background: The European Commission funds a European research project titled “Health Risk from Environmental Pollution Levels in Urban Systems” (HEREPLUS that focuses on environmental health within Europe. The HEREPLUS project was presented at the 16th EUPHA conference in Lisbon in November 2008 within a workshop named “The assessment of the effect of air pollution on population and environmental health: the integration of epidemiology and geographical information system (GIS”.

    Methods: The HEREPLUS project aims to measure the correlation between air pollution (especially ozone and particulate matter, meteorology, vegetation and human health in four European cities (Rome, Madrid, Athens and Dresden by using a Geoinformation System to develop risk maps and subsequently guidelines to reduce air pollution and number of diseases.

    Results: The project started in September 2008 and a large, structured, relational database has been developed and completed. A literature review including national as well as international scientific literature goes on and will be completed in April 2009. Final results will be presented and published in 2011.

    Conclusions: Detailed scientific knowledge is important and needed to implement environmental programmes with the overall aim to protect human population against environmental related diseases.

  15. A model of the environmental impacts of hydropower projects

    International Nuclear Information System (INIS)

    Kemppainen, T.; Haemaelaeinen, I.

    1992-01-01

    The aim was to create a model of the effects of hydropower modernization and extension projects in Finland. To illustrate the effects of hydropower projects a checklist in the form of matrice was constructed. In this matrice all issues that could be significant in future hydropower projects were collected. Stable physical environmental changes are the starting-point for this matrice. The temporary change of hydropower constructions have also been under consideration. These are mainly environmental changes during construction. In chapter two the effects of hydropower modernization and extension projects physical environmental changes were examined. In chapter three the matrice was applied to some example cases. The cases were chosen to represent future hydropower projects. In addition these example cases represent urban areas, rural areas and uninhabited areas. The example cases were the extension of Tainionkoski hydropower plant at Vuoksi river, the modernization of Aeetsae power plant at Kokemaeenjoki river, the modernization of Stadsfors power plant at Lapuanjoki river in the centre of Uusikaarlepyy town and the construction of Kaitfors power plant at Perhonjoki river. Conclusions from usability of the model can be drawn on the ground of the example cases. The purpose of the model is to produce a checklist of estimated environmental effects in hydropower project of various kinds. Examination of issues within the model depends on local circumstances. Endangered animal and plant species, for example, can be studied and estimated only if endangered animal and plant species exist in the area of hydropower plant. Furthermore, the direction and extent of environmental effects depend on the local circumstances. The model is mainly a checklist of environmental effects caused by hydropower plant projects

  16. Environmental monitoring for the DOE coolside and LIMB demonstration extension projects

    Energy Technology Data Exchange (ETDEWEB)

    White, T.; Contos, L.; Adams, L. (Radian Corp., Research Triangle Park, NC (United States))

    1992-03-01

    The purpose of this document is to present environmental monitoring data collected during the US Department of Energy Limestone Injection Multistage Burner (DOE LIMB) Demonstration Project Extension at the Ohio Edison Edgewater Generating Station in Lorain, Ohio. The DOE project is an extension of the US Environmental Protection Agency's (EPA's) original LIMB Demonstration. The program is operated nuclear DOE's Clean Coal Technology Program of emerging clean coal technologies'' under the categories of in boiler control of oxides of sulfur and nitrogen'' as well as post-combustion clean-up.'' The objective of the LIMB program is to demonstrate the sulfur dioxide (SO{sub 2}) and nitrogen oxide (NO{sub x}) emission reduction capabilities of the LIMB system. The LIMB system is a retrofit technology to be used for existing coal-fired boilers equipped with electrostatic precipitators (ESPs).

  17. Guidebook on environmental impact assessment for in situ leach mining projects

    International Nuclear Information System (INIS)

    2005-05-01

    Assessment of the potential environmental impact of an in situ leach (ISL) project is the first step in the permission and licensing process. An Environmental Impact Assessment (EIA) serves as the basis for preparing an Environmental Impact Statement (EIS), which in turn identifies the potential environmental and socioeconomic impact of a proposed project and outlines measures to mitigate the impact. The EIS review process serves to inform the public about a proposed project as well as provide regulatory agencies with assurance that ISL technology will comply with environmental standards, and that project sites can be rehabilitated to pre-mining use. This publication provides a step-by-step description of project parameters that must be addressed in conducting an EIA and preparing an EIS. It also includes EIA/EIS case histories for current operations in Australia, the Czech Republic, Kazakhstan and the United States of America. The publication will be useful to companies considering development of ISL projects and to regulatory personnel who are responsible for writing environmental regulations and licensing ISL projects

  18. Overview of the Hanford Environmental Dose Reconstruction Project

    International Nuclear Information System (INIS)

    Shipler, D.B.; Napier, B.A.; Ikenberry, T.A.

    1992-04-01

    The objective of the Hanford Environmental Dose Reconstruction (HEDR) Project is to estimate the radiation doses that specific and representative individuals and populations may have received as a result of releases of radioactive materials from historical operations at the Hanford Site. These dose estimates would account for the uncertainties of information regarding facilities operations, environmental monitoring, demography, food consumption and lifestyles, and the variability of natural phenomena. Other objectives of the HEDR Project include: supporting the Hanford Thyroid Disease Study (HTDS), declassifying Hanford-generated information and making it available to the public, performing high-quality, credible science, and conducting the project in an open, public forum. The project is briefly described

  19. Lessons Learned From the Environmental Public Health Tracking Sub-County Data Pilot Project.

    Science.gov (United States)

    Werner, Angela K; Strosnider, Heather; Kassinger, Craig; Shin, Mikyong

    2017-12-07

    Small area data are key to better understanding the complex relationships between environmental health, health outcomes, and risk factors at a local level. In 2014, the Centers for Disease Control and Prevention's National Environmental Public Health Tracking Program (Tracking Program) conducted the Sub-County Data Pilot Project with grantees to consider integration of sub-county data into the National Environmental Public Health Tracking Network (Tracking Network). The Tracking Program and grantees developed sub-county-level data for several data sets during this pilot project, working to standardize processes for submitting data and creating required geographies. Grantees documented challenges they encountered during the pilot project and documented decisions. This article covers the challenges revealed during the project. It includes insights into geocoding, aggregation, population estimates, and data stability and provides recommendations for moving forward. National standards for generating, analyzing, and sharing sub-county data should be established to build a system of sub-county data that allow for comparison of outcomes, geographies, and time. Increasing the availability and accessibility of small area data will not only enhance the Tracking Network's capabilities but also contribute to an improved understanding of environmental health and informed decision making at a local level.

  20. The SusHouse project. Use and maintenance of clothing as an example. Environmental analysis of system-level future scenarios

    International Nuclear Information System (INIS)

    Knot, M.; Bras-Klapwijk, R.M.

    2001-01-01

    The SusHouse project assumed that system-level innovations are necessary for sustainable development, involving new arrangements and combined innovations in technology, organisation and behaviour. The life cycle analysis (LCA) method has been used and adapted to evaluate the potential of such complex system-level strategies to reduce environmental impact. This article explains and discusses this approach and presents some assessment results for the SusHouse research into clothing. The requirements and systems used were found to yield interesting insights into relevant solutions and strategies. The future scenarios for clothing promise major improvements in most of the environmental indicators, with particular contributions from changes in the quantity and quality of clothing consumed. The article recommends extending the approach with a 'turning points' analysis, because of the many uncertainties, as well as the use of more differentiated indicators and the inclusion of a focused trend analysis. 17 refs

  1. An Analysis of the Most Adopted Rating Systems for Assessing the Environmental Impact of Buildings

    Directory of Open Access Journals (Sweden)

    Elena Bernardi

    2017-07-01

    Full Text Available Rating systems for assessing the environmental impact of buildings are technical instruments that aim to evaluate the environmental impact of buildings and construction projects. In some cases, these rating systems can also cover urban-scale projects, community projects, and infrastructures. These schemes are designed to assist project management in making the projects more sustainable by providing frameworks with precise criteria for assessing the various aspects of a building’s environmental impact. Given the growing interest in sustainable development worldwide, many rating systems for assessing the environmental impact of buildings have been established in recent years, each one with its peculiarities and fields of applicability. The present work is motivated by an interest in emphasizing such differences to better understand these rating systems and extract the main implications to building design. It also attempts to summarize in a user-friendly form the vast and fragmented assortment of information that is available today. The analysis focuses on the six main rating systems: the Building Research Establishment Environmental Assessment Methodology (BREEAM, the Comprehensive Assessment System for Built Environment Efficiency (CASBEE, the Deutsche Gesellschaft für Nachhaltiges Bauen (DGNB, the Haute Qualité Environnementale (HQETM, the Leadership in Energy and Environmental Design (LEED, and the Sustainable Building Tool (SBTool.

  2. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2003

    International Nuclear Information System (INIS)

    2004-01-01

    This Annual Site Environmental Report for the West Valley Demonstration Project (WVDP or Project) is published to inform those with interest about environmental conditions at the WVDP. In accordance with U.S. Department of Energy (DOE) Order 231.1A, Environment, Safety, and Health Reporting, the report summarizes calendar year (CY) 2003 environmental monitoring data so as to describe the performance of the WVDP's environmental management system (EMS), confirm compliance with standards and regulations, and highlight important programs. During 2003, cleanup of radioactive waste from the former nuclear fuels reprocessing plant that shut down operations in the 1970s was continued at the WVDP. The Project is located in western New York State, about 30 miles south of Buffalo, within the New York State-owned Western New York Nuclear Service Center (WNYNSC). The WVDP is being conducted in cooperation with the New York State Energy Research and Development Authority. Work activities at the WVDP during 2003 included: (1) maintaining canisters of vitrified high-level waste in a shielded facility; (2) shipping low-level radioactive waste offsite for disposal; (3) shipping packaged spent nuclear fuel assemblies to Idaho National Engineering and Environmental Laboratory; (4) constructing a facility where large high-activity components can be safely size-reduced and packaged for disposal; (5) decontaminating the fuel storage pool and the cask unloading pool; (6) decontaminating the general purpose cell and the process mechanical cell (also referred to as the head end cells); (7) cleanup of waste in the plutonium purification cell (south) and extraction cell number 2 in the main plant; (8) planning for decontamination and dismantlement of the vitrification facility; (9) continuing preparation of the Decommissioning and/or Long-Term Stewardship Environmental Impact Statement; and (10) monitoring the environment and managing contaminated areas within the Project facility premises

  3. Development of a Real-Time Environmental Monitoring System, Life Cycle Assessment Systems, and Pollution Prevention Programs

    Science.gov (United States)

    Kocher, Walter M.

    2003-01-01

    Pollution prevention (P2) opportunities and Greening the Government (GtG) activities, including the development of the Real-Time Environmental Monitoring System (RTEMS), are currently under development at the NASA Glenn Research Center. The RTEMS project entails the ongoing development of a monitoring system which includes sensors, instruments, computer hardware and software, plus a data telemetry system.Professor Kocher has been directing the RTEMS project for more than 3 years, and the implementation of the prototype system at GRC will be a major portion of his summer effort. This prototype will provide mulitmedia environmental monitoring and control capabilities, although water quality and air emissions will be the immediate issues addressed this summer. Applications beyond those currently identified for environmental purposes will also be explored.

  4. Technology-based management of environmental organizations using an Environmental Management Information System (EMIS): Design and development

    Science.gov (United States)

    Kouziokas, Georgios N.

    2016-01-01

    The adoption of Information and Communication Technologies (ICT) in environmental management has become a significant demand nowadays with the rapid growth of environmental information. This paper presents a prototype Environmental Management Information System (EMIS) that was developed to provide a systematic way of managing environmental data and human resources of an environmental organization. The system was designed using programming languages, a Database Management System (DBMS) and other technologies and programming tools and combines information from the relational database in order to achieve the principal goals of the environmental organization. The developed application can be used to store and elaborate information regarding: human resources data, environmental projects, observations, reports, data about the protected species, environmental measurements of pollutant factors or other kinds of analytical measurements and also the financial data of the organization. Furthermore, the system supports the visualization of spatial data structures by using geographic information systems (GIS) and web mapping technologies. This paper describes this prototype software application, its structure, its functions and how this system can be utilized to facilitate technology-based environmental management and decision-making process.

  5. Wireless data management system for environmental monitoring in livestock buildings

    Directory of Open Access Journals (Sweden)

    James Gray

    2017-03-01

    Full Text Available The impact of air quality on the health, welfare and productivity of livestock needs to be considered, especially when livestock are kept in enclosed buildings. The monitoring of such environmental factors allows for the development of appropriate strategies to reduce detrimental effects of sub-optimal air quality on the respiratory health of both livestock and farmers. In 2009, an environmental monitoring system was designed, developed and tested that allowed for the monitoring of a number of airborne pollutants. One limitation of the system was the manual collection of logged data from each unit. This paper identifies limitations of the current environmental monitoring system and suggests a range of networking technologies that can be used to increase usability. Consideration is taken for the networking of environmental monitoring units, as well as the collection of recorded data. Furthermore, the design and development of a software system that is used to collate and store recorded environmental data from multiple farms is explored. In order to design such a system, simplified software engineering processes and methodologies have been utilised. The main steps taken in order to complete the project were requirements elicitation with clients, requirements analysis, system design, implementation and finally testing. The outcome of the project provided a potential prototype for improving the environmental monitoring system and analysis informing the benefit of the implementation.

  6. Hanford Environmental Information System (HEIS) user's manual

    International Nuclear Information System (INIS)

    1991-10-01

    The Hanford Environmental Information System (HEIS) is a consolidated set of automated resources that effectively manage the data gathered during environmental monitoring and restoration of the Hanford Site. The HEIS includes an integrated database that provides consistent and current data to all users and promotes sharing of data by the entire user community. Data stored in the HEIS are collected under several regulatory programs. Currently these include the Comprehensive Environmental Response, Compensation and Liability Act of 1980 (CERCLA); the Resource Conservation and Recovery Act of 1976 (RCRA); and the Ground-Water Environmental Surveillance Project, managed by the Pacific Northwest Laboratory. The HEIS is an information system with an inclusive database. The manual, the HEIS User's Manual, describes the facilities available to the scientist, engineer, or manager who uses the system for environmental monitoring, assessment, and restoration planning; and to the regulator who is responsible for reviewing Hanford Site operations against regulatory requirements and guidelines

  7. Optimised Environmental Test Approaches in the GOCE Project

    Science.gov (United States)

    Ancona, V.; Giordano, P.; Casagrande, C.

    2004-08-01

    The Gravity Field and Steady-State Ocean Circulation Explorer (GOCE) is dedicated to measuring the Earth's gravity field and modelling the geoid with extremely high accuracy and spatial resolution. It is the first Earth Explorer Core mission to be developed as part of ESA's Living Planet Programme and is scheduled for launch in 2006. The program is managed by a consortium of European companies: Alenia Spazio, the prime contractor, Astrium GmbH, the platform responsible, Alcatel Space Industries and Laben, suppliers of the main payloads, respectively the Electrostatic Gravity Gradiometer (EGG) and the Satellite to Satellite Tracking Instrument (SSTI), actually a precise GPS receiver. The GOCE Assembly Integration and Verification (AIV) approach is established and implemented in order to demonstrate to the customer that the satellite design meets the applicable requirements and to qualify and accept from lower level up to system level. The driving keywords of "low cost" and "short schedule" program, call for minimizing the development effort by utilizing off-the-shelf equipment combined with a model philosophy lowering the number of models to be used. The paper will deal on the peculiarities of the optimized environmental test approach in the GOCE project. In particular it introduces the logic of the AIV approach and describe the foreseen tests at system level within the SM environmental test campaign, outlining the Quasi Static test performed in the frame of the SM sine vibration tests, and the PFM environmental test campaign pinpointing the deletion of the Sine Vibration test on PFM model. Furthermore the paper highlights how the Model and Test Effectiveness Database (MATD) can be utilized for the prediction of the new space projects like GOCE Satellite.

  8. Effectiveness of Environmental Impact Assessment system in Estonia

    International Nuclear Information System (INIS)

    Heinma, Kaupo; Poder, Tonis

    2010-01-01

    To be effective, an Environmental Impact Assessment (EIA) system, first, has to minimize the probability that projects with significant environmental effects are implemented without EIA, and second, minimize the number of EIAs, which do not provide decision makers with essential information, so that the decision is improved as a result of EIA. The objective of this study was to find out how frequently in Estonia the projects implemented without EIA have caused significant environmental effects, and to measure the relative frequency of EIAs that have no influence on decision. An extensive survey with e-mail distributed questionnaires was carried out to reveal information from governmental agencies, local self-governments, and developers. There was no evidence that projects authorized without EIA have had environmental impacts, which could have been mitigated as a result of EIA. In contrast, about half of EIAs did not alter the decision of relevant authorities. This proportion was valid to both mandatory EIAs and those initiated on judgement basis. In our view, the proportion of no-influence EIAs was excessive and indicated the need to reconsider the provisions applying to the projects with a mandatory EIA requirement as well as judgements practice.

  9. Inventory of current environmental monitoring projects in the US-Canadian transboundary region

    Energy Technology Data Exchange (ETDEWEB)

    Glantz, C.S.; Ballinger, M.Y.; Chapman, E.G.

    1986-05-01

    This document presents the results of a study commissioned to survey and summarize major environmental monitoring projects in the US-Canadian transboundary region. Projects with field sites located within 400 km (250 mi) of the border and active after 1980 were reviewed. The types of projects included: ambient air-quality monitoring, ambient water-quality monitoring, deposition monitoring, forest/vegetation monitoring and research, soil studies, and ecosystem studies. Ecosystem studies included projects involving the measurement of parameters from more than one monitoring category (e.g., studies that measured both water and soil chemistry). Individual descriptions were formulated for 184 projects meeting the spatial and temporal criteria. Descriptions included the official title for the project, its common abbreviation, program emphasis, monitoring site locations, time period conducted, parameters measured, protocols employed, frequency of sample collection, data storage information, and the principal contact for the project. A summary inventory subdivided according to the six monitoring categories was prepared using a computerized data management system. Information on major centralized data bases in the field of environmental monitoring was also obtained, and summary descriptions were prepared. The inventory and data base descriptions are presented in appendices to this document.

  10. ARM Radiosondes for National Polar-Orbiting Operational Environmental Satellite System Preparatory Project Validation Field Campaign Report

    Energy Technology Data Exchange (ETDEWEB)

    Borg, Lori [Univ. of Wisconsin, Madison, WI (United States); Tobin, David [Univ. of Wisconsin, Madison, WI (United States); Reale, Anthony [National Oceanic and Atmospheric Administration (NOAA), Washington, DC (United States); Knuteson, Robert [Univ. of Wisconsin, Madison, WI (United States); Feltz, Michelle [Univ. of Wisconsin, Madison, WI (United States); Liu, Mark [National Oceanic and Atmospheric Administration (NOAA), Washington, DC (United States); Holdridge, Donna J [Argonne National Lab. (ANL), Argonne, IL (United States); Mather, James [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2017-06-01

    This IOP has been a coordinated effort involving the U.S. Department of Energy (DOE) Atmospheric Radiation (ARM) Climate Research Facility, the University of Wisconsin (UW)-Madison, and the JPSS project to validate SNPP NOAA Unique Combined Atmospheric Processing System (NUCAPS) temperature and moisture sounding products from the Cross-track Infrared Sounder (CrIS) and the Advanced Technology Microwave Sounder (ATMS). In this arrangement, funding for radiosondes was provided by the JPSS project to ARM. These radiosondes were launched coincident with the SNPP satellite overpasses (OP) at four of the ARM field sites beginning in July 2012 and running through September 2017. Combined with other ARM data, an assessment of the radiosonde data quality was performed and post-processing corrections applied producing an ARM site Best Estimate (BE) product. The SNPP targeted radiosondes were integrated into the NOAA Products Validation System (NPROVS+) system, which collocated the radiosondes with satellite products (NOAA, National Aeronautics and Space Administration [NASA], European Organisation for the Exploitation of Meteorological Satellites [EUMETSAT], Geostationary Operational Environmental Satellite [GOES], Constellation Observing System for Meteorology, Ionosphere, and Climate [COSMIC]) and Numerical Weather Prediction (NWP forecasts for use in product assessment and algorithm development. This work was a fundamental, integral, and cost-effective part of the SNPP validation effort and provided critical accuracy assessments of the SNPP temperature and water vapor soundings.

  11. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2008

    Energy Technology Data Exchange (ETDEWEB)

    West Valley Environmental Services LLC (WVES) and URS - Washington Division

    2009-09-24

    Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2008. The report summarizes the calendar year (CY) 2008 environmental monitoring program data at the WVDP so as to describe the performance of the WVDP’s environmental management system (EMS), confirm compliance with standards and regulations, and highlight important programs. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of the environment, continual improvement, prevention and/or minimization of pollution, public outreach, and stakeholder involvement. In addition to demonstrating compliance with environmental regulations and directives, evaluation of data collected in 2008 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  12. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2008

    International Nuclear Information System (INIS)

    2009-01-01

    Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2008. The report summarizes the calendar year (CY) 2008 environmental monitoring program data at the WVDP so as to describe the performance of the WVDP's environmental management system (EMS), confirm compliance with standards and regulations, and highlight important programs. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of the environment, continual improvement, prevention and/or minimization of pollution, public outreach, and stakeholder involvement. In addition to demonstrating compliance with environmental regulations and directives, evaluation of data collected in 2008 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  13. Olympic Dam project: assessment of the environmental impact

    International Nuclear Information System (INIS)

    1983-11-01

    The assessment report on the Environmental Impact Statement produced for the Olympic Dam project is intended to provide the South Australian Government with a comprehensive evaluation of the potential impact of the proposal and to make recommendations concerning the project to be negotiated with the Joint Venturers prior to approval of the EIS. The project involves the mining, processing and sale of products from the copper-uranium ore body at Olympic Dam on the Roxby Downs Station, South Australia. The report includes a description of the proposal, a description of the environment likely to be affected, a discussion of the potential impacts on that environment, a discussion of the adequacy of information presented in the EIS and a discussion of the acceptability of the environmental impacts. The Department has concluded that the pre-design proposal is acceptable on environmental grounds

  14. Field Testing of Environmentally Friendly Drilling System

    Energy Technology Data Exchange (ETDEWEB)

    David Burnett

    2009-05-31

    The Environmentally Friendly Drilling (EFD) program addresses new low-impact technology that reduces the footprint of drilling activities, integrates light weight drilling rigs with reduced emission engine packages, addresses on-site waste management, optimizes the systems to fit the needs of a specific development sites and provides stewardship of the environment. In addition, the program includes industry, the public, environmental organizations, and elected officials in a collaboration that addresses concerns on development of unconventional natural gas resources in environmentally sensitive areas. The EFD program provides the fundamentals to result in greater access, reasonable regulatory controls, lower development cost and reduction of the environmental footprint associated with operations for unconventional natural gas. Industry Sponsors have supported the program with significant financial and technical support. This final report compendium is organized into segments corresponding directly with the DOE approved scope of work for the term 2005-2009 (10 Sections). Each specific project is defined by (a) its goals, (b) its deliverable, and (c) its future direction. A web site has been established that contains all of these detailed engineering reports produced with their efforts. The goals of the project are to (1) identify critical enabling technologies for a prototype low-impact drilling system, (2) test the prototype systems in field laboratories, and (3) demonstrate the advanced technology to show how these practices would benefit the environment.

  15. SIHTI 2. Energy and environmental technology. Yearbook 1995. Project presentations

    International Nuclear Information System (INIS)

    Korhonen, M.; Thun, R.

    1997-01-01

    Detrimental impacts of various energy production forms, their prevention and costs to enterprises and to the society are studied in the National Research Programme on Energy and Environmental Technology - SIHTI 2. For this evaluation work databases on Finland's energy production, fuels and boilers and emissions of various production forms are needed. This is one of the main subtasks of the SIHTI Programme. Development of methods and tools required for environmental decision making and for the assessment of environmental costs and testing of their usability and reliability are equally important. Emission measurements are a problem field that continuously sets new challenges. In addition to energy production and its environmental impacts, environmental issues of the woodprocessing industries form another important research field of SIHTI 2 programme. A common aim of both fields is to reduce emissions of detrimental substances, to recycle raw materials, and to minimise and reuse wastes. Research and development projects are being carried out by a number of universities of different fields of science and technology, by research organisations and enterprises, and many projects are realised in close co-operation. In 1995, the programme comprised 28 R and D projects by universities and 22 enterprise-led projects. Results of these projects are presented in this yearbook. Part of the research projects continued from the preceding year and part were new projects continuing in 1996

  16. Impact of financial institution environmental guidelines on international power generation projects

    International Nuclear Information System (INIS)

    Macak, J.J. III; Schott, G.A.

    1995-01-01

    Where financing is concerned, two major players for US based international power projects are The World Bank and the Export-Import Bank of the US (Ex-Im Bank). The concern for environmental protection is a global issue, yet many countries still have no enforceable environmental regulations for power generation facilities. In the past, many projects were developed with little or no environmental controls. However, designing a power generation project to meet The World Bank environmental guidelines is now generally regarded as standard practice for independent power projects in the developing world (Price et al, 1994). The World Bank standards are mandatory for projects financed by The World Bank, through the International Finance Corporation (IFC), or associated programs like the Expanded Cofinancing Program of the International Bank for Reconstruction and Development (IBRD). The Ex-Im Bank has recently established new environmental procedures and guidelines that went into effect on February 1, 1995. In order to avoid a competitive disadvantage for US exporters and still provide a means for global environmental protection, Ex-Im Bank has taken a leadership role in encouraging the adoption of common environmental procedures and standards by leading export credit agencies around the world. Until such procedures are established, Ex-Im Bank is seeking to establish common lines in specific cases with the Organization for Economic Cooperation and Development (OECD) on environmental standards for appropriate projects (Ex-Im, 1994)

  17. Hanford Environmental Dose Reconstruction Project, Quarterly report, September--November 1993

    International Nuclear Information System (INIS)

    Cannon, S.D.; Finch, S.M.

    1993-01-01

    The objective of the Hanford Environmental Dose Reconstruction (HEDR) Project is to estimate the radiation doses that individuals and populations could have received from nuclear operations at Hanford since 1944. The project is divided into the following technical tasks. These tasks correspond to the path radionuclides followed from release to impact on humans (dose estimates); Source Terms, Environmental Transport, Environmental Monitoring Data, Demography, Food Consumption, and Agriculture, and Environmental Pathways and Dose Estimates

  18. An overview of the Environmental Monitoring Computer Automation Project

    International Nuclear Information System (INIS)

    Johnson, S.M.; Lorenz, R.

    1992-01-01

    The Savannah River Site (SRS) was bulk to produce plutonium and tritium for national defense. As a result of site operations, routine and accidental releases of radionuclides have occurred. The effects these releases have on the k>cal population and environment are of concern to the Department of Energy (DOE) and SRS personnel. Each year, approximately 40,000 environmental samples are collected. The quality of the samples, analytical methods and results obtained are important to site personnel. The Environmental Monitoring Computer Automation Project (EMCAP) was developed to better manage scheduling, log-in, tracking, analytical results, and report generation. EMCAP can be viewed as a custom Laboratory Information Management System (LIMS) with the ability to schedule samples, generate reports, and query data. The purpose of this paper is to give an overview of the SRS environmental monitoring program, describe the development of EMCAP software and hardware, discuss the different software modules, show how EMCAP improved the Environmental Monitoring Section program, and examine the future of EMCAP at SRS

  19. Developing a system dynamics model to analyse environmental problem in construction site

    Science.gov (United States)

    Haron, Fatin Fasehah; Hawari, Nurul Nazihah

    2017-11-01

    This study aims to develop a system dynamics model at a construction site to analyse the impact of environmental problem. Construction sites may cause damages to the environment, and interference in the daily lives of residents. A proper environmental management system must be used to reduce pollution, enhance bio-diversity, conserve water, respect people and their local environment, measure performance and set targets for the environment and sustainability. This study investigates the damaging impact normally occur during the construction stage. Environmental problem will cause costly mistake in project implementation, either because of the environmental damages that are likely to arise during project implementation, or because of modification that may be required subsequently in order to make the action environmentally acceptable. Thus, findings from this study has helped in significantly reducing the damaging impact towards environment, and improve the environmental management system performance at construction site.

  20. Environmental management plan (EMP) for Melamchi water supply project, Nepal.

    Science.gov (United States)

    Khadka, Ram B; Khanal, Anil B

    2008-11-01

    More than 1.5 million people live in the Kathmandu valley. The valley is facing an extreme shortage of water supply. At the same time the demand is escalating rapidly. To address this issue of scarcity of water, the government of Nepal has proposed a project of inter-basin transfer of water from Melamchi River located 40 km north-east of the Kathmandu valley. The project will cover two districts and three municipalities and will potentially have significant impacts on the environment. In accordance with the Environmental Protection Regulation of Nepal (1997), the Melamchi Water Supply Project (MWSP) has undergone an EIA during the feasibility study stage of the proposed project. The recommendations contained in the EIA were integrated into the project design for implementation in 2006. This paper summarizes the background of MWSP, the environmental concerns described in the EIA and the status of Environmental Management Plan (EMP) developed to address environmental compliance and other issues involving participation and support of the local people. This paper also provides some lessons to learn on the modalities of addressing the demands and grievances of the local people concerning environmental management.

  1. Uranium Mill Tailings Remedial Action Project Environmental Protection Implementation Plan

    International Nuclear Information System (INIS)

    Vollmer, A.T.

    1993-10-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Environmental Protection Implementation Plan (EPIP) has been prepared in accordance with the requirements of the US Department of Energy (DOE) Order 5400.1. The UMTRA EPIP covers the time period of November 9, 1993, through November 8, 1994. It will be updated annually. Its purpose is to provide management direction to ensure that the UMTRA Project is operated and managed in a manner that will protect, maintain, and where necessary, restore environmental quality, minimize potential threats to public health and the environment, and comply with environmental regulations and DOE policies. Contents of this report are: (1) general description of the UMTRA project environmental protection program; (2) notifications; (3) planning and reporting; (4) special programs; (5) environmental monitoring programs; (6) quality assurance and data verification; and (7) references

  2. Uranium Mill Tailings Remedial Action Project Environmental Protection Implementation Plan

    Energy Technology Data Exchange (ETDEWEB)

    Vollmer, A.T.

    1993-10-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Environmental Protection Implementation Plan (EPIP) has been prepared in accordance with the requirements of the US Department of Energy (DOE) Order 5400.1. The UMTRA EPIP covers the time period of November 9, 1993, through November 8, 1994. It will be updated annually. Its purpose is to provide management direction to ensure that the UMTRA Project is operated and managed in a manner that will protect, maintain, and where necessary, restore environmental quality, minimize potential threats to public health and the environment, and comply with environmental regulations and DOE policies. Contents of this report are: (1) general description of the UMTRA project environmental protection program; (2) notifications; (3) planning and reporting; (4) special programs; (5) environmental monitoring programs; (6) quality assurance and data verification; and (7) references.

  3. Environmental Impact Assessment Process for Oil, Gas and Mining Projects in Nigeria: A Critical Analysis

    Directory of Open Access Journals (Sweden)

    Allan Ingelson and Chilenye Nwapi

    2014-06-01

    Full Text Available Oil and gas development projects are well known to have damaging environmental effects, and that is especially true in the Niger Delta region. Since the enactment of the Environmental Impact Assessment Act in Nigeria in 1992, there has been a general perception that EIAs are seldom carried out in the region. This article presents a critical analysis of legislation and practice concerning the environmental impact assessment (EIA process for oil and gas projects in Nigeria, the world’s twelfth largest producer of crude oil. It discusses a range of reasons why the impacts of oil and gas projects are not being managed well, despite the legal requirements for EIAs. A review of Nigeria’s environmental governance is presented along with a comprehensive discussion of the EIA process and its significant deficiencies. We argue that the EIA system for oil and gas projects in Nigeria reflects tokenism, resulting in the concentration of benefits of developments in big corporations and government officials. The EIA process in Nigeria faces many challenges that must be addressed in order to improve its effectiveness and alleviate the environmental burdens on this rich oil-producing region.

  4. Projects: viable alternatives in the Environmental Education?

    Directory of Open Access Journals (Sweden)

    Marcos Jose Terossi

    2011-11-01

    Full Text Available In this article we are going to develop the reflection about the projects, its genesis, its use in education and environmental education.To this end, we will promote the discussion about the so-called "method of projects" and "projects pedagogy", with a comparison between them and outlining the approach that we consider most appropriate to EA, its limits and possibilities within the critical perspective, manufacturing and emancipatory education.

  5. HISPANIC ENVIRONMENTAL AND WASTE MANAGEMENT OUTREACH PROJECT

    International Nuclear Information System (INIS)

    Sebastian Puente

    1998-01-01

    The Department of Energy Office of Environmental Management (DOE-EM) in cooperation with the Self Reliance Foundation (SRF) is conducting the Hispanic Environmental and Waste Management Outreach Project (HEWMO) to increase science and environmental literacy, specifically that related to nuclear engineering and waste management in the nuclear industry, among the US Hispanic population. The project will encourage Hispanic youth and young adults to pursue careers through the regular presentation of Spanish-speaking scientists and engineers and other role models, as well as career information on nationally broadcast radio programs reaching youth and parents. This project will encourage making science, mathematics, and technology a conscious part of the everyday life experiences of Hispanic youth and families. The SRF in collaboration with the Hispanic Radio Network (HRN) produces and broadcasts radio programs to address the topics and meet the objectives as outlined in the Environmental Literacy Plan and DOE-EM Communications Plan in this document. The SRF has in place a toll-free ''800'' number Information and Resource Referral (I and RR) service that national radio program listeners can call to obtain information and resource referrals as well as give their reactions to the radio programs that will air. HRN uses this feature to put listeners in touch with local organizations and resources that can provide them with further information and assistance on the related program topics

  6. HISPANIC ENVIRONMENTAL AND WASTE MANAGEMENT OUTREACH PROJECT

    Energy Technology Data Exchange (ETDEWEB)

    Sebastian Puente

    1998-07-25

    The Department of Energy Office of Environmental Management (DOE-EM) in cooperation with the Self Reliance Foundation (SRF) is conducting the Hispanic Environmental and Waste Management Outreach Project (HEWMO) to increase science and environmental literacy, specifically that related to nuclear engineering and waste management in the nuclear industry, among the US Hispanic population. The project will encourage Hispanic youth and young adults to pursue careers through the regular presentation of Spanish-speaking scientists and engineers and other role models, as well as career information on nationally broadcast radio programs reaching youth and parents. This project will encourage making science, mathematics, and technology a conscious part of the everyday life experiences of Hispanic youth and families. The SRF in collaboration with the Hispanic Radio Network (HRN) produces and broadcasts radio programs to address the topics and meet the objectives as outlined in the Environmental Literacy Plan and DOE-EM Communications Plan in this document. The SRF has in place a toll-free ''800'' number Information and Resource Referral (I and RR) service that national radio program listeners can call to obtain information and resource referrals as well as give their reactions to the radio programs that will air. HRN uses this feature to put listeners in touch with local organizations and resources that can provide them with further information and assistance on the related program topics.

  7. Hellsgate Winter Range: Wildlife Mitigation Project. Final Environmental Assessment

    International Nuclear Information System (INIS)

    1995-03-01

    BPA proposes to fund the Hellsgate Winter Range: Wildlife Mitigation Project (Project) in a cooperative effort with the Colville Confederated Tribes and the Bureau of Indian Affairs (BIA). The Project is intended to mitigate for wildlife and wildlife habitat adversely affected by the construction of Grand Coulee and Chief Joseph Dams and their reservoirs. The Project would allow the sponsors to secure land and conduct wildlife habitat improvement and long-term management activities within the boundaries of the Colville Indian Reservation. BPA has prepared an Environmental Assessment (EA) (DOE/EA-0940) evaluating the potential environmental effects of the proposed Project (Alternative B) and No Action (Alternative A). Protection and re-establishment of riparian and upland habitat on the Colville Indian Reservation, under Alternative B, would not have a significant adverse environmental impact because: (1) there would be only limited, mostly short-term adverse impacts on soils, water quality, air quality, vegetation, and wildlife (including no effect on endangered species); and (2) there would be no adverse effect on water quantity, cultural resources, or land use. Based on the analysis in the EA, BPA has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an Environmental Impact Statement (EIS) is not required and BPA is issuing this FONSI

  8. WEST VALLEY DEMONSTRATION PROJECT ANNUAL SITE ENVIRONMENTAL REPORT CALENDAR YEAR 2002

    International Nuclear Information System (INIS)

    2003-01-01

    This annual environmental monitoring report for the West Valley Demonstration Project (WVDP or Project) is published to inform those with interest about environmental conditions at the WVDP. In accordance with U.S. Department of Energy (DOE) Order 231.1, Environment, Safety, and Health Reporting, the report summarizes calendar year (CY) 2002 environmental monitoring data so as to describe the performance of the WVDP's environmental management system, confirm compliance with standards and regulations, and highlight important programs. In 2002, the West Valley Demonstration Project, the site of a DOE environmental cleanup activity operated by West Valley Nuclear Services Co. (WVNSCO), was in the final stages of stabilizing high-level radioactive waste (HLW) that remained at the site after commercial nuclear fuel reprocessing had been discontinued in the early 1970s. The Project is located in western New York State, about 30 miles south of Buffalo, within the New York State-owned Western New York Nuclear Service Center (WNYNSC). The WVDP is being conducted in cooperation with the New York State Energy Research and Development Authority (NYSERDA). Ongoing work activities at the WVDP during 2002 included: (1) completing HLW solidification and melter shutdown; (2) shipping low-level radioactive waste off-site for disposal; (3) constructing a facility where large high-activity components can be safely packaged for disposal; (4) packaging and removing spent materials from the vitrification facility; (5) preparing environmental impact statements for future activities; (6) removing as much of the waste left behind in waste tanks 8D-1 and 8D-2 as was reasonably possible; (7) removing storage racks, canisters, and debris from the fuel receiving and storage pool, decontaminating pool walls, and beginning shipment of debris for disposal; (8) ongoing decontamination in the general purpose cell and the process mechanical cell (also referred to as the head end cells); (9) planning

  9. WEST VALLEY DEMONSTRATION PROJECT ANNUAL SITE ENVIRONMENTAL REPORT CALENDAR YEAR 2002

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2003-09-12

    This annual environmental monitoring report for the West Valley Demonstration Project (WVDP or Project) is published to inform those with interest about environmental conditions at the WVDP. In accordance with U.S. Department of Energy (DOE) Order 231.1, Environment, Safety, and Health Reporting, the report summarizes calendar year (CY) 2002 environmental monitoring data so as to describe the performance of the WVDP's environmental management system, confirm compliance with standards and regulations, and highlight important programs. In 2002, the West Valley Demonstration Project, the site of a DOE environmental cleanup activity operated by West Valley Nuclear Services Co. (WVNSCO), was in the final stages of stabilizing high-level radioactive waste (HLW) that remained at the site after commercial nuclear fuel reprocessing had been discontinued in the early 1970s. The Project is located in western New York State, about 30 miles south of Buffalo, within the New York State-owned Western New York Nuclear Service Center (WNYNSC). The WVDP is being conducted in cooperation with the New York State Energy Research and Development Authority (NYSERDA). Ongoing work activities at the WVDP during 2002 included: (1) completing HLW solidification and melter shutdown; (2) shipping low-level radioactive waste off-site for disposal; (3) constructing a facility where large high-activity components can be safely packaged for disposal; (4) packaging and removing spent materials from the vitrification facility; (5) preparing environmental impact statements for future activities; (6) removing as much of the waste left behind in waste tanks 8D-1 and 8D-2 as was reasonably possible; (7) removing storage racks, canisters, and debris from the fuel receiving and storage pool, decontaminating pool walls, and beginning shipment of debris for disposal; (8) ongoing decontamination in the general purpose cell and the process mechanical cell (also referred to as the head end cells); (9

  10. Environmental Control Project

    International Nuclear Information System (INIS)

    Anon.

    Research carried out in the Environmental Control Project of the 'Centro de Energia Nuclear na Agricultura' (CENA), Piracicaba , Sao Paulo State, Brazil, is described. Such research comprises: determination of ions and metals in waters from different sources; survey of the mineralogical composition of Amazon Basin rivers; development of specific methodologies for the determination of minerals in studies of mineral nutrition of plants and animal nutrition; development of methodologies for the determination of wood sample density, a nuclear method being developed to be applied to field conditions; study of the water flux mouvement within wood. (M.A.) [pt

  11. Willow Creek Wildlife Mitigation Project. Final environmental assessment

    International Nuclear Information System (INIS)

    1995-04-01

    Today's notice announces BPA's proposal to fund land acquisition or acquisition of a conservation easement and a wildlife management plan to protect and enhance wildlife habitat at the Willow Creek Natural Area in Eugene, Oregon. This action would provide partial mitigation for wildlife and wildlife habitat lost by the development of Federal hydroelectric projects in the Willamette River Basin. The project is consistent with BPA's obligations under provisions of the Pacific Northwest Electric Power Planning and Conservation Act of 1980 as outlined by the Northwest Power Planning Council's 1994 Columbia River Basin Fish and Wildlife Program. BPA has prepared an environmental assessment (DOE/EA-1023) evaluating the proposed project. Based on the analysis in the EA, BPA has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an environmental impact statement (EIS) is not required and BPA is issuing this FONSI

  12. Environmental management compliance reengineering project, FY 1997 report

    International Nuclear Information System (INIS)

    VanVliet, J.A.; Davis, J.N.

    1997-09-01

    Through an integrated reengineering effort, the Idaho National Engineering and Environmental Laboratory (INEEL) is successfully implementing process improvements that will permit safe and compliant operations to continue during the next 5 years, even though $80 million was removed from the Environmental Management (EM) program budget. A 2-year analysis, design, and implementation project will reengineer compliance-related activities and reduce operating costs by approximately $17 million per year from Fiscal Year (FY) 1998 through 2002, while continuing to meet the INEEL''s environment, safety, and health requirements and milestone commitments. Compliance reengineer''s focus is improving processes, not avoiding full compliance with environmental, safety, and health laws. In FY 1997, compliance reengineering used a three-phase approach to analyze, design, and implement the changes that would decrease operating costs. Implementation for seven specific improvement projects was completed in FY 1997, while five projects will complete implementation in FY 1998. During FY 1998, the three-phase process will be repeated to continue reengineering the INEEL

  13. Environmental management compliance reengineering project, FY 1997 report

    Energy Technology Data Exchange (ETDEWEB)

    VanVliet, J.A.; Davis, J.N.

    1997-09-01

    Through an integrated reengineering effort, the Idaho National Engineering and Environmental Laboratory (INEEL) is successfully implementing process improvements that will permit safe and compliant operations to continue during the next 5 years, even though $80 million was removed from the Environmental Management (EM) program budget. A 2-year analysis, design, and implementation project will reengineer compliance-related activities and reduce operating costs by approximately $17 million per year from Fiscal Year (FY) 1998 through 2002, while continuing to meet the INEEL`s environment, safety, and health requirements and milestone commitments. Compliance reengineer`s focus is improving processes, not avoiding full compliance with environmental, safety, and health laws. In FY 1997, compliance reengineering used a three-phase approach to analyze, design, and implement the changes that would decrease operating costs. Implementation for seven specific improvement projects was completed in FY 1997, while five projects will complete implementation in FY 1998. During FY 1998, the three-phase process will be repeated to continue reengineering the INEEL.

  14. BPA/PGE transmission support project: Final environmental assessment

    International Nuclear Information System (INIS)

    1996-12-01

    This Mitigation Action Plan describes the mitigation measures identified in the BPA/PGE Transmission Support Project Environmental Assessment. These measures commit to actions that will reduce the environmental impacts that could occur by constructing, operating and maintaining the transmission line and related facilities. They have been developed in coordination with environmental specialists, design and construction engineers and maintenance personnel. The measures will be written into the construction specifications for the project, which is expected to be constructed by contract personnel. Unless noted in the plan, the construction inspector or the line foreman would be responsible for carrying out the mitigation; environmental staff would also monitor the area for mitigation effectiveness. The right-of-way would be cleared in 1997 or 1998, and construction would begin in the spring of 1998 and be completed later that fall

  15. Uranium Mill Tailings Remedial Action Project 1994 environmental report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-08-01

    This annual report documents the Uranium Mill Tailings Remedial Action (UMTRA) Project environmental monitoring and protection program. The UMTRA Project routinely monitors radiation, radioactive residual materials, and hazardous constituents at associated former uranium tailings processing sites and disposal sites. At the end of 1994, surface remedial action was complete at 14 of the 24 designated UMTRA Project processing sites: Canonsburg, Pennsylvania; Durango, Colorado; Grand Junction, Colorado; Green River Utah, Lakeview, Oregon; Lowman, Idaho; Mexican Hat, Utah; Riverton, Wyoming; Salt Lake City, Utah; Falls City, Texas; Shiprock, New Mexico; Spook, Wyoming, Tuba City, Arizona; and Monument Valley, Arizona. Surface remedial action was ongoing at 5 sites: Ambrosia Lake, New Mexico; Naturita, Colorado; Gunnison, Colorado; and Rifle, Colorado (2 sites). Remedial action has not begun at the 5 remaining UMTRA Project sites that are in the planning stage. Belfield and Bowman, North Dakota; Maybell, Colorado; and Slick Rock, Colorado (2 sites). The ground water compliance phase of the UMTRA Project started in 1991. Because the UMTRA Project sites are.` different stages of remedial action, the breadth of the UMTRA environmental protection program differs from site to site. In general, sites actively undergoing surface remedial action have the most comprehensive environmental programs for sampling media. At sites where surface remedial action is complete and at sites where remedial action has not yet begun, the environmental program consists primarily of surface water and ground water monitoring to support site characterization, baseline risk assessments, or disposal site performance assessments.

  16. Uranium Mill Tailings Remedial Action Project 1994 environmental report

    International Nuclear Information System (INIS)

    1995-08-01

    This annual report documents the Uranium Mill Tailings Remedial Action (UMTRA) Project environmental monitoring and protection program. The UMTRA Project routinely monitors radiation, radioactive residual materials, and hazardous constituents at associated former uranium tailings processing sites and disposal sites. At the end of 1994, surface remedial action was complete at 14 of the 24 designated UMTRA Project processing sites: Canonsburg, Pennsylvania; Durango, Colorado; Grand Junction, Colorado; Green River Utah, Lakeview, Oregon; Lowman, Idaho; Mexican Hat, Utah; Riverton, Wyoming; Salt Lake City, Utah; Falls City, Texas; Shiprock, New Mexico; Spook, Wyoming, Tuba City, Arizona; and Monument Valley, Arizona. Surface remedial action was ongoing at 5 sites: Ambrosia Lake, New Mexico; Naturita, Colorado; Gunnison, Colorado; and Rifle, Colorado (2 sites). Remedial action has not begun at the 5 remaining UMTRA Project sites that are in the planning stage. Belfield and Bowman, North Dakota; Maybell, Colorado; and Slick Rock, Colorado (2 sites). The ground water compliance phase of the UMTRA Project started in 1991. Because the UMTRA Project sites are.' different stages of remedial action, the breadth of the UMTRA environmental protection program differs from site to site. In general, sites actively undergoing surface remedial action have the most comprehensive environmental programs for sampling media. At sites where surface remedial action is complete and at sites where remedial action has not yet begun, the environmental program consists primarily of surface water and ground water monitoring to support site characterization, baseline risk assessments, or disposal site performance assessments

  17. International environmental issues and requirements for new power projects

    Energy Technology Data Exchange (ETDEWEB)

    Newman, J.R. [Golder Associates Inc., Gainesville, FL (United States); Maltby, J.H. [Golder Associates Inc., Washington, DC (United States)

    1997-12-31

    The purpose of this presentation was to discuss the emerging role of financial entities in determining environmental requirements for international power projects. The paper outlines the following: emerging conditions; examples of announced privatization energy projects by country; types of government and international financial entity sources; problems for IPPs; similarity and differences between the World Bank and the USEPA; comparison of the international standards and regulations for power plants; recent trends/issues involving international power project approval; and recommendations for understanding/expediting the financial entities` environmental approval process and how to expedite this process.

  18. Environmental monitoring for the DOE coolside and LIMB demonstration extension projects

    Energy Technology Data Exchange (ETDEWEB)

    White, T.; Contos, L.; Adams, L. (Radian Corp., Research Triangle Park, NC (United States). Progress Center)

    1992-02-01

    The purpose of this document is to present environmental monitoring data collected during the US DOE Limestone Injection Multistage Burner (LIMB) Demonstration Project Extension. The objective of the LIMB program is to demonstrate the sulfur dioxide (SO{sub 2}) and nitrogen oxide (NO{sub x}) emission reduction capabilities of the LIMB system. The LIMB system is a retrofit technology to be used for existing coal-fired boilers equipped with electrostatic precipitators. (VC)

  19. DIADEM: a system for collaborative environmental monitoring

    NARCIS (Netherlands)

    Winterboer, A.; Martens, M.A.; Pavlin, G.; Groen, F.C.A.; Evers, V.

    2011-01-01

    Environmental monitoring and emergency response projects in urban-industrial areas increasingly rely on efficient collaboration between experts in control rooms and at incident locations, and citizens who live or work in the area. In the video accompanying this abstract we present a system that uses

  20. DOE Heat Pump Centered Integrated Community Energy Systems Project

    Energy Technology Data Exchange (ETDEWEB)

    Calm, J. M.

    1979-01-01

    The Heat Pump Centered Integrated Community Energy Systems (HP-ICES) Project is a multiphase undertaking seeking to demonstrate one or more operational HP-ICES by the end of 1983. The seven phases include System Development, Demonstration Design, Design Completion, HP-ICES Construction, Operation and Data Acquisition, HP-ICES Evaluation, and Upgraded Continuation. This project is sponsored by the Community Systems Branch, Office of Buildings and Community Systems, Assistant Secretary for Conservation and Solar Applicaions, U.S. Department of Energy (DOE). It is part of the Community Systems Program and is managed by the Energy and Environmental Systems Division of Argonne Natinal Laboratory.

  1. Promoting system-level learning from project-level lessons

    Energy Technology Data Exchange (ETDEWEB)

    Jong, Amos A. de, E-mail: amosdejong@gmail.com [Innovation Management, Utrecht (Netherlands); Runhaar, Hens A.C., E-mail: h.a.c.runhaar@uu.nl [Section of Environmental Governance, Utrecht University, Utrecht (Netherlands); Runhaar, Piety R., E-mail: piety.runhaar@wur.nl [Organisational Psychology and Human Resource Development, University of Twente, Enschede (Netherlands); Kolhoff, Arend J., E-mail: Akolhoff@eia.nl [The Netherlands Commission for Environmental Assessment, Utrecht (Netherlands); Driessen, Peter P.J., E-mail: p.driessen@geo.uu.nl [Department of Innovation and Environment Sciences, Utrecht University, Utrecht (Netherlands)

    2012-02-15

    A growing number of low and middle income nations (LMCs) have adopted some sort of system for environmental impact assessment (EIA). However, generally many of these EIA systems are characterised by a low performance in terms of timely information dissemination, monitoring and enforcement after licencing. Donor actors (such as the World Bank) have attempted to contribute to a higher performance of EIA systems in LMCs by intervening at two levels: the project level (e.g. by providing scoping advice or EIS quality review) and the system level (e.g. by advising on EIA legislation or by capacity building). The aims of these interventions are environmental protection in concrete cases and enforcing the institutionalisation of environmental protection, respectively. Learning by actors involved is an important condition for realising these aims. A relatively underexplored form of learning concerns learning at EIA system-level via project level donor interventions. This 'indirect' learning potentially results in system changes that better fit the specific context(s) and hence contribute to higher performances. Our exploratory research in Ghana and the Maldives shows that thus far, 'indirect' learning only occurs incidentally and that donors play a modest role in promoting it. Barriers to indirect learning are related to the institutional context rather than to individual characteristics. Moreover, 'indirect' learning seems to flourish best in large projects where donors achieved a position of influence that they can use to evoke reflection upon system malfunctions. In order to enhance learning at all levels donors should thereby present the outcomes of the intervention elaborately (i.e. discuss the outcomes with a large audience), include practical suggestions about post-EIS activities such as monitoring procedures and enforcement options and stimulate the use of their advisory reports to generate organisational memory and ensure a better

  2. Promoting system-level learning from project-level lessons

    International Nuclear Information System (INIS)

    Jong, Amos A. de; Runhaar, Hens A.C.; Runhaar, Piety R.; Kolhoff, Arend J.; Driessen, Peter P.J.

    2012-01-01

    A growing number of low and middle income nations (LMCs) have adopted some sort of system for environmental impact assessment (EIA). However, generally many of these EIA systems are characterised by a low performance in terms of timely information dissemination, monitoring and enforcement after licencing. Donor actors (such as the World Bank) have attempted to contribute to a higher performance of EIA systems in LMCs by intervening at two levels: the project level (e.g. by providing scoping advice or EIS quality review) and the system level (e.g. by advising on EIA legislation or by capacity building). The aims of these interventions are environmental protection in concrete cases and enforcing the institutionalisation of environmental protection, respectively. Learning by actors involved is an important condition for realising these aims. A relatively underexplored form of learning concerns learning at EIA system-level via project level donor interventions. This ‘indirect’ learning potentially results in system changes that better fit the specific context(s) and hence contribute to higher performances. Our exploratory research in Ghana and the Maldives shows that thus far, ‘indirect’ learning only occurs incidentally and that donors play a modest role in promoting it. Barriers to indirect learning are related to the institutional context rather than to individual characteristics. Moreover, ‘indirect’ learning seems to flourish best in large projects where donors achieved a position of influence that they can use to evoke reflection upon system malfunctions. In order to enhance learning at all levels donors should thereby present the outcomes of the intervention elaborately (i.e. discuss the outcomes with a large audience), include practical suggestions about post-EIS activities such as monitoring procedures and enforcement options and stimulate the use of their advisory reports to generate organisational memory and ensure a better information

  3. An outline of the application of an environmental management system to the PRAMU (Uranium Mining Environmental Restitution Project); Ejemplo de aplicacion de un sistema de gestion ambiental en el PRAMU: Proyecto de Restitucion Ambiental de la Mineria del Uranio

    Energy Technology Data Exchange (ETDEWEB)

    Smetniansky de De Grande, Nelida; Avila Cadena, Guadalberto; Cardozo, Damian [Comision Nacional de Energia Atomica, Buenos Aires (Argentina). Unidad Ejecutora del Proyecto PRAMU

    2000-07-01

    In Argentina the National Atomic Energy Commission (CNEA) has the responsibility to restore uranium mining facilities, when milling operations have been shut down. To carry out this clean up actions CNEA created the Project for Uranium Mining Environmental Restoration (PRAMU in Spanish). To take into account the environmental aspects of the restoration activities, the PRAMU includes in its management an Environmental Management System (SGA in Spanish), which is of central importance in determining the environmental policy, objectives and targets. In this work a general view of the Environmental Management System is presented and an example of one of the environmental programs to be implemented is detailed. (author)

  4. Integrating Project-Based Service-Learning into an Advanced Environmental Chemistry Course

    Science.gov (United States)

    Draper, Alison J.

    2004-02-01

    In an advanced environmental chemistry course, the inclusion of semester-long scientific service projects successfully integrated the research process with course content. Each project involved a unique community-based environmental analysis in which students assessed an aspect of environmental health. The projects were due in small pieces at even intervals, and students worked independently or in pairs. Initially, students wrote a project proposal in which they chose and justified a project. Following a literature review of their topic, they drafted sampling and analysis plans using methods in the literature. Samples were collected and analyzed, and all students assembled scientific posters describing the results of their study. In the last week of the semester, the class traveled to a regional professional meeting to present the posters. In all, students found the experience valuable. They learned to be professional environmental chemists and learned the value of the discipline to community health. Students not only learned about their own project in depth, but they were inspired to learn textbook material, not for an exam, but because it helped them understand their own project. Finally, having a community to answer to at the end of the project motivated students to do careful work.

  5. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2004

    Energy Technology Data Exchange (ETDEWEB)

    West Valley Nuclear Services Company (WVNSCO) and URS Group, Inc.

    2005-09-30

    Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2004. The report summarizes the environmental protection program at the West Valley Demonstration Project for CY 2004.

  6. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2004

    International Nuclear Information System (INIS)

    2005-01-01

    Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2004. The report summarizes the environmental protection program at the West Valley Demonstration Project for CY 2004

  7. The NextData Project: a national Italian system for the retrieval, storage, access and diffusion of environmental and climate data from mountain and marine areas

    Science.gov (United States)

    Provenzale, Antonello

    2013-04-01

    Mountains are sentinels of climate and environmental change and many marine regions provide information on past climate variations. The Project of Interest NextData will favour the implementation of measurement networks in remote mountain and marine areas and will develop efficient web portals to access meteoclimatic and atmospheric composition data, past climate information from ice and sediment cores, biodiversity and ecosystem data, measurements of the hydrological cycle, marine reanalyses and climate projections at global and regional scale. New data on the present and past climatic variability and future climate projections in the Alps, the Himalaya-Karakoram, the Mediterranean region and other areas of interest will be obtained and made available. The pilot studies conducted during the project will allow for obtaining new estimates on the availability of water resources and on the effects of atmospheric aerosols on high-altitude environments, as well as new assessments of the impact of climate change on ecosystems, health and societies in mountain regions. The system of archives and the scientific results produced by the NextData project will provide a unique data base for research, for environmental management and for the estimate of climate change impacts, allowing for the development of knowledge-based environmental and climate adaptation policies.

  8. Virtual Reality Platform Based Simulation System of Environmental Noise Abatement Research

    Science.gov (United States)

    Yijun, Liu; Yu, Fang; Xiaoman, He; Yongyou, Wang

    The general mathematic mode of computing noise abatement is commonly used for most project planning and appraisal of environmental noise abatement projects. However, the inconvenient and impracticable mode and algorithm usually cannot meet the real world computation and testing. Therefore, a more practicable abatement mode and algorithm (multiple noise sources with multiband under sound barriers) which had been applied to VR based simulation system. That implemented the function of real-time demonstrating noise scattering condition within 3D virtual space, furthermore, with sound barriers added in 3D scene, the effectiveness of denoise by sound barriers also can be demonstrated within this system. That provides a significant solution for environmental noise abatement projects as a whole.

  9. Overview criteria for the environmental, safety and health evaluation of remedial action project planning

    International Nuclear Information System (INIS)

    Stenner, R.D.; Denham, D.H.

    1984-10-01

    Overview criteria (i.e., subject areas requiring review) for evaluating remedial action project plans with respect to environmental, safety and health issues were developed as part of a Department of Energy, Office of Operational Safety, technical support project. Nineteen elements were identified as criteria that should be addressed during the planning process of a remedial action (decontamination and decommissioning) project. The scope was interpreted broadly enough to include such environmental, safety and health issues as public image, legal obligation and quality assurance, as well as more obvious concerns such as those involving the direct protection of public and worker health. The nineteen elements are discussed along with suggested ways to use a data management software system to organize and report results

  10. Environmental qualification program for Wolsong project

    International Nuclear Information System (INIS)

    Duggal, A.; Johal, H.; Yee, F.; Suh, S.K.

    1995-01-01

    The Wolsong EQ Program is a process that begins at the design concept stage and continues throughout the operating life of the station. As all components may not have a 30 year service life without periodic maintenance, the EQ Program becomes an important management tool for the owner of the plant. First, the environmental conditions are predicted for the postulated events. Next, suitably qualified equipment is specified and procured. Then the equipment is installed according to specific instructions. Finally, by means of ongoing maintenance and replacement of parts, the qualification of the equipment is maintained during the operating life of the plant. Proper documentation and traceability is required at all stages of the program. As defined in the Wolsong Project Environmental Qualification Design Guide a comprehensive Environmental Qualification (EQ) Program ensures that safety related equipment located in an area in which a harsh environment could occur, can function when required for the life of the station . This program was implemented at the beginning of the Wolsong project. Using this program, components/equipment are qualified prior to installation and a maintenance program is established to keep equipment 'qualified' throughout the station life

  11. Licensing and Environmental Issues of Wave Energy Projects

    DEFF Research Database (Denmark)

    Neumann, Frank; Tedd, James; Prado, Miguel

    2006-01-01

    a special standing or facilitated access to operating licenses due to their experimental character, the move of wave energy projects towards commercial applications implies complex procedures for obtaining licenses both with respect to the construction and deployment and operation phases, as well......The major non-technical barrier for large-scale wave energy implementation is the wide range of licensing issues and potential environmental concerns, in addition to significant National/regional differences in licensing procedures and permit requirements. Whereas some pilot plants have had...... as concerning ocean space use and environmental concerns. Despite recent efforts to streamline European EIA (Environmental Impact Assessment) in general, potential project developers are far from having a clear view of present and future requirements concerning these barriers on a trans-national level...

  12. A Cloud-based Infrastructure and Architecture for Environmental System Research

    Science.gov (United States)

    Wang, D.; Wei, Y.; Shankar, M.; Quigley, J.; Wilson, B. E.

    2016-12-01

    The present availability of high-capacity networks, low-cost computers and storage devices, and the widespread adoption of hardware virtualization and service-oriented architecture provide a great opportunity to enable data and computing infrastructure sharing between closely related research activities. By taking advantage of these approaches, along with the world-class high computing and data infrastructure located at Oak Ridge National Laboratory, a cloud-based infrastructure and architecture has been developed to efficiently deliver essential data and informatics service and utilities to the environmental system research community, and will provide unique capabilities that allows terrestrial ecosystem research projects to share their software utilities (tools), data and even data submission workflow in a straightforward fashion. The infrastructure will minimize large disruptions from current project-based data submission workflows for better acceptances from existing projects, since many ecosystem research projects already have their own requirements or preferences for data submission and collection. The infrastructure will eliminate scalability problems with current project silos by provide unified data services and infrastructure. The Infrastructure consists of two key components (1) a collection of configurable virtual computing environments and user management systems that expedite data submission and collection from environmental system research community, and (2) scalable data management services and system, originated and development by ORNL data centers.

  13. Environmental Management System

    Science.gov (United States)

    Goals Recycling Green Purchasing Pollution Prevention Reusing Water Resources Environmental Management Stewardship » Environmental Protection » Environmental Management System Environmental Management System An Environmental Management System is a systematic method for assessing mission activities, determining the

  14. FASSET - An European project for environmental protection

    International Nuclear Information System (INIS)

    Bruchertseifer, F.

    2003-01-01

    The European research project ''FASSET'' (Framework ASSessment of Enviromental ImpacT) will provide a framework of the environmental impact of the effects of ionising radiation and will identify protection aims for the environmental protection. This project represent a collaboration of different organisations from the European community: Sweden, Norway, Finland, Great Britain, Spain, France and Germany. The German participants are the GSF-research centre for environment and health and the German radiation protection office. The project is founded by the 5 th EC research programme. The existing national and international radiation protection regulations are focused to the humans. Other species, like plants and animals, are protected indirectly, if their habitat are close to urban areas or they represent a part of the food chain. The ICRP position ''if the man is protected, nature is protected as well'' is now under reconsideration by a ICRP-Taskgroup. The identification of perilled real reference organism by the FASSET-project is an working tool for the definition of the protection aims. For that purpose the project is divided into three working packages: dosimetry, exposure pathways and effects. Another working package is responsible for the developing of the concept using the results provided by the other working packages. (orig.)

  15. A statistical proposal for environmental impact assessment of development projects

    International Nuclear Information System (INIS)

    Plazas C, Julian A; De J Lema T, Alvaro; Leon P, Juan Diego

    2009-01-01

    Environmental impact assessment of development projects is a fundamental process, which main goal is to avoid that their construction and functioning, lead to serious and negative consequences on the environment. Some of the most important limitations of the models employed to assess environmental impacts, are the subjectivity of its parameters and weights, and the multicolineality among the variables, which represent high quantities of similar information. This work presents a multivariate statistical-based method that tries to diminish such limitations. For this purpose, environmental impact assessment, is valuated through different environmental impact attributes and environmental elements, synthesized in an environmental quality index (ICA in Spanish). ICA can be applied at different levels, such as at a project level, or applied only at a partial level on one or some environmental components.

  16. Environmental setting for biological variability at PTEPBN project of West Kalimantan

    International Nuclear Information System (INIS)

    Suwadji, E.; Endrawanto

    1995-01-01

    Biological variability was needed in the arrangement of environmental evaluation study on term of environmental impact assessment. The activity was carried out at PTEPBN project to find out and to predict the environmental setting of outgoing and ongoing project as well as the project operational after post construction. Methods to find out the environmental setting on biological variability were proposed. Based on the observation data on its terrestrial and aquatic flora and fauna, it can be concluded that terrestrial flora was found at fair to good value, terrestrial fauna at fair to good whereas aquatic flora and fauna at good. (author). 8 refs, 7 tabs, 1 fig

  17. Hanford environmental dose reconstruction project - an overview

    International Nuclear Information System (INIS)

    Shipler, D.B.; Napier, B.A.; Farris, W.T.

    1996-01-01

    The Hanford Environmental Dose Reconstruction Project was initiated because of public interest in the historical releases of radioactive materials from the Hanford Site, located in southcentral Washington State. By 1986, over 38,000 pages of environmental monitoring documentation from the early years of Hanford operations had been released. Special committees reviewing the documents recommended initiation of the Hanford Environmental Dose Reconstruction Project, which began in October 1987, and is conducted by Battelle, Pacific Northwest Laboratories. The technical approach taken was to reconstruct releases of radioactive materials based on facility operating information; develop and/or adapt transport, pathway, and dose models and computer codes; reconstruct environmental, meterological, and hydrological monitoring information; reconstruct demographic, agricultural, and lifestyle characteristics; apply statistical methods to all forms of uncertainty in the information, parameters, and models; and perform scientific investigation that were technically defensible. The geographic area for the study includes ∼2 x 10 5 km 2 (75,000 mi 2 ) in eastern Washington, western Idaho, and northeastern Oregon (essentially the Mid-columbia Basin of the Pacific Northwest). Three exposure pathways were considered: the atmosphere, the Columbia River, and ground water

  18. Site environmental report for the Yucca Mountain Project. Calendar Year 2005

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2006-10-01

    This site environmental report describes the environmental program conducted during 2005 by the U.S. Department of Energy, Office of Repository Development. The report describes the environmental laws and regulations that were applicable to the Yucca Mountain Project in 2005, the actions taken to comply with those laws and regulations, and the Project’s environmental program. The report also summarizes the data collected to monitor potential impacts of the Project on the environment.

  19. Willow Creek Wildlife Mitigation Project. Final Environmental Assessment.

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-04-01

    Today`s notice announces BPA`s proposal to fund land acquisition or acquisition of a conservation easement and a wildlife management plan to protect and enhance wildlife habitat at the Willow Creek Natural Area in Eugene, Oregon. This action would provide partial mitigation for wildlife and wildlife habitat lost by the development of Federal hydroelectric projects in the Willamette River Basin. The project is consistent with BPA`s obligations under provisions of the Pacific Northwest Electric Power Planning and Conservation Act of 1980 as outlined by the Northwest Power Planning Council`s 1994 Columbia River Basin Fish and Wildlife Program. BPA has prepared an environmental assessment (DOE/EA-1023) evaluating the proposed project. Based on the analysis in the EA, BPA has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an environmental impact statement (EIS) is not required and BPA is issuing this FONSI.

  20. Near-Facility Environmental Monitoring Quality Assurance Project Plan

    International Nuclear Information System (INIS)

    MCKINNEY, S.M.

    2000-01-01

    This Quality Assurance Project Plan addresses the quality assurance requirements for the activities associated with the preoperational and near-facility environmental monitoring directed by Waste Management Technical Services and supersedes HNF-EP-0538-4. This plan applies to all sampling and monitoring activities performed by Waste Management Technical Services in implementing near-facility environmental monitoring at the Hanford Site. This Quality Assurance Project Plan is required by U.S. Department of Energy Order 5400.1 (DOE 1990) as a part of the Environmental Monitoring Plan (DOE-RL 1997) and is used to define: Environmental measurement and sampling locations used to monitor environmental contaminants near active and inactive facilities and waste storage and disposal sites; Procedures and equipment needed to perform the measurement and sampling; Frequency and analyses required for each measurement and sampling location; Minimum detection level and accuracy; Quality assurance components; and Investigation levels. Near-facility environmental monitoring for the Hanford Site is conducted in accordance with the requirements of U.S. Department of Energy Orders 5400.1 (DOE 1990), 5400.5 (DOE 1993), 5484.1 (DOE 1990), and 435.1 (DOE 1999), and DOE/EH-O173T (DOE 1991). It is Waste Management Technical Services' objective to manage and conduct near-facility environmental monitoring activities at the Hanford Site in a cost-effective and environmentally responsible manner that is in compliance with the letter and spirit of these regulations and other environmental regulations, statutes, and standards

  1. Environmentally Preferable Coatings for Structural Steel Project

    Science.gov (United States)

    Lewis, Pattie L. (Editor)

    2014-01-01

    The Ground Systems Development and Operations (GSDO) Program at NASA John F. Kennedy Space Center (KSC) has the primary objective of modernizing and transforming the launch and range complex at KSC to benefit current and future NASA programs along with other emerging users. Described a the "launch support and infrastructure modernization program" in the NASA Authorization Act of 2010, the GSDO Program will develop and implement shared infrastructure and process improvements to provide more flexible, affordable, and responsive capabilities to a multi-user community. In support of the GSDO Program, the objective of this project is to determine the feasibility of environmentally friendly corrosion resistant coatings for launch facilities and ground support equipment. The focus of the project is corrosion resistance and survivability with the goal to reduce the amount of maintenance required to preserve the performance of launch facilities while reducing mission risk. Number of facilities/structures with metallic structural and non-structural components in a highly corrosive environment. Metals require periodic maintenance activity to guard against the insidious effects of corrosion and thus ensure that structures meet or exceed design or performance life. The standard practice for protecting metallic substrates in atmospheric environments is the application of corrosion protective coating system.

  2. Environmental Audit of the Grand Junction Projects Office

    Energy Technology Data Exchange (ETDEWEB)

    1991-08-01

    The Grand Junction Projects Office (GJPO) is located in Mesa County, Colorado, immediately south and west of the Grand Junction city limits. The US Atomic Energy Commission (AEC) established the Colorado Raw Materials Office at the present-day Grand Junction Projects Office in 1947, to aid in the development of a viable domestic uranium industry. Activities at the site included sampling uranium concentrate; pilot-plant milling research, including testing and processing of uranium ores; and operation of a uranium mill pilot plant from 1954 to 1958. The last shipment of uranium concentrate was sent from GJPO in January, 1975. Since that time the site has been utilized to support various DOE programs, such as the former National Uranium Resource Evaluation (NURE) Program, the Uranium Mill Tailings Remedial Action Project (UMTRAP), the Surplus Facilities Management Program (SFMP), and the Technical Measurements Center (TMC). All known contamination at GJPO is believed to be the result of the past uranium milling, analyses, and storage activities. Hazards associated with the wastes impounded at GJPO include surface and ground-water contamination and potential radon and gamma-radiation exposure. This report documents the results of the Baseline Environmental Audit conducted at Grand Junction Projects Office (GJPO) located in Grand Junction, Colorado. The Grand Junction Baseline Environmental Audit was conducted from May 28 to June 12, 1991, by the Office of Environmental Audit (EH-24). This Audit evaluated environmental programs and activities at GJPO, as well as GJPO activities at the State-Owned Temporary Repository. 4 figs., 12 tabs.

  3. Environmental Audit of the Grand Junction Projects Office

    International Nuclear Information System (INIS)

    1991-08-01

    The Grand Junction Projects Office (GJPO) is located in Mesa County, Colorado, immediately south and west of the Grand Junction city limits. The US Atomic Energy Commission (AEC) established the Colorado Raw Materials Office at the present-day Grand Junction Projects Office in 1947, to aid in the development of a viable domestic uranium industry. Activities at the site included sampling uranium concentrate; pilot-plant milling research, including testing and processing of uranium ores; and operation of a uranium mill pilot plant from 1954 to 1958. The last shipment of uranium concentrate was sent from GJPO in January, 1975. Since that time the site has been utilized to support various DOE programs, such as the former National Uranium Resource Evaluation (NURE) Program, the Uranium Mill Tailings Remedial Action Project (UMTRAP), the Surplus Facilities Management Program (SFMP), and the Technical Measurements Center (TMC). All known contamination at GJPO is believed to be the result of the past uranium milling, analyses, and storage activities. Hazards associated with the wastes impounded at GJPO include surface and ground-water contamination and potential radon and gamma-radiation exposure. This report documents the results of the Baseline Environmental Audit conducted at Grand Junction Projects Office (GJPO) located in Grand Junction, Colorado. The Grand Junction Baseline Environmental Audit was conducted from May 28 to June 12, 1991, by the Office of Environmental Audit (EH-24). This Audit evaluated environmental programs and activities at GJPO, as well as GJPO activities at the State-Owned Temporary Repository. 4 figs., 12 tabs

  4. LIFE CYCLE DESIGN GUIDANCE MANUAL - ENVIRONMENTAL REQUIREMENTS AND THE PRODUCT SYSTEM

    Science.gov (United States)

    The U.S Environmental Protection Agency's (EPA) Risk Reduction Engineering Laboratory and the University of Michigan are cooperating in a project to reduce environmental impacts and health risks through product system design. The resulting framework for life cycle design is pr...

  5. 78 FR 2685 - Central Utah Project Completion Act; East Hobble Creek Restoration Project Draft Environmental...

    Science.gov (United States)

    2013-01-14

    ... DEPARTMENT OF THE INTERIOR Office of the Secretary Central Utah Project Completion Act; East Hobble Creek Restoration Project Draft Environmental Assessment AGENCY: Office of the Assistant Secretary... assessment for the East Hobble Creek Restoration Project is available for public review and comment. The...

  6. Draft Environmental Impact Statement: Proposed Tenaska, Washington II Generation Project

    International Nuclear Information System (INIS)

    1993-08-01

    BPA is considering whether to purchase electrical power from a proposed privately-owned combustion-turbine electrical generation plant in Washington. The plant would be fired by natural gas and would use combined-cycle technology to generate 240 average megawatts (aMW) of energy. The plant would be developed, owned, and operated by Tenaska Power Partners, Inc. The project would be located about 19 kilometers (12 miles) southeast of downtown Tacoma in the Frederickson Industrial Area, Pierce County. The proposed plant would occupy about half of a 6.4-hectare (16-acre) parcel and would be consistent with the industrial character of its surroundings. The proposed site is currently undeveloped and zoned for industrial use by the county. Main environmental concerns identified in the scoping process and evaluated in the Environmental Impact Statement (EIS) include: potential air quality impacts such as emissions and their contribution to the ''greenhouse'' effect; potential health and safety impacts, such as nuisance odors, plant safety, visibility and heat-emission systems which may affect low-flying planes and potential health effects of electric and magnetic fields, and potential water quality impacts such as the amount of wastewater to be discharged, the source and amount of water required for plant operation. These and other issues are discussed in detail in the EIS. The proposed project already includes many features designed to reduce environmental impacts. Based on investigations performed for the EIS, no significant unavoidable adverse environmental impacts associated with the proposed project were identified, and no evidence emerged to suggest that the proposed action is particularly controversial. The EIS is being mailed to numerous agencies, groups, and individuals. There will be a 45-day comment period, during which a Public Hearing will be held

  7. Melancthon Grey Wind Project environmental screening report

    International Nuclear Information System (INIS)

    2005-01-01

    Canadian Hydro has proposed that the Melancthon and Grey Highlands Townships in Dufferin County, Ontario are ideally suited for the installation of a 240 MW wind farm. Assuming a turbine rating of 1.5 MW each, a total of 160 turbines could be installed. The utility has decided to undertake the project in up to 4 phases. This paper focuses on the construction and operation of a 75 MW wind turbine array (50, 1.5 MW turbines) dispersed over an area of about 3,511 hectares in the Melancthon Township. The total expected cost of the first phase is $130 million, with construction scheduled to begin in April 2005 for an in-service date of no later than March 31, 2006 to meet the Wind Power Production Incentive (WPPI) funding requirements. This environmental screening report (ESR) was completed to help Canadian Hydro fulfill regulatory requirements. It presented the project summary, the estimated capacity of the wind farm, and construction schedule. The environmental setting was also presented along with power line routing. This ESR addressed issues that may impact surface and ground water quality, air quality, soil erosion, environmental noise and disposal of waste materials. Issues affecting migratory birds, agricultural resources, community characteristics, construction related traffic, public health, historical resources and viewscapes were also addressed. The general conclusion of the ESR is that the project can be constructed, operated and decommissioned in such a manner as to minimize potentially adverse effects on the environment while enhancing the positive effects both locally and provincially. Migratory bird deaths due to collision with turbines are expected to be negligible and the effects of breeding bird habitat have been minimized through proposed mitigation measures. Environmental noise levels are expected to be within the applicable noise criteria. There will be no negative effect on property values within the viewshed of the turbines. There are many net

  8. Final rapid reactivation project environmental assessment

    International Nuclear Information System (INIS)

    1999-01-01

    The US Department of Energy (DOE) has prepared an environmental assessment (EA) for the Rapid Reactivation Project at Sandia National Laboratories, New Mexico. The EA analyzes the potential effects of a proposal to increase production of neutron generators from the current capability of 600 units per year up to 2,000 units per year. The project would use existing buildings and infrastructure to the maximum extent possible to meet the additional production needs. The increased production levels would necessitate modifications and additions involving a total area of approximately 26,290 gross square feet at Sandia National Laboratories, New Mexico, Technical Area 1. Additional production equipment would be procured and installed. The no-action alternative would be to continue production activities at the current capability of 600 units per year. The EA analyzes effects on health, safety, and air quality, resulting from construction and operation and associated cumulative effects. A detailed description of the proposed action and its environmental consequences is presented in the EA

  9. The Project-Based Learning Approach in Environmental Education

    Science.gov (United States)

    Genc, Murat

    2015-01-01

    The purpose of this study is to investigate the effect of project-based learning on students' attitudes toward the environment. In the study that was performed with 39 students who take the "Environmental Education" course, attitude changes toward the environment were investigated in students who developed projects on environmental…

  10. Effects of control technology on the projected krypton-85 environmental inventory

    International Nuclear Information System (INIS)

    Oscarson, E.E.

    1973-01-01

    Growth projections for the USA nuclear power industry may be used to make projections of future radioactive material inventories available for potential release to the environment. Since krypton-85 is produced in reactors, the potential routes of release to the environment are at the reactors or the fuel reprocessing plants. The present generation of reactors and fuel reprocessing plants do not use any systems to limit the release of krypton-85 into the biosphere. Clean-up systems are currently being designed and could be introduced when necessary. The cumulative inventory of krypton-85 in the environment is dependent upon the time of introduction of these clean-up systems and their efficiencies, in addition to the total quantity produced. Annual and cumulative inventories of krypton-85 are projected to increase dramatically over the next 50 years. If controls are assumed to be initiated at various years, a series of graphs of different cumulative environmental inventories and the associated doses and health effects are drawn. Varying the year of introduction and the efficiency of these systems allows one to speculate as to the optimum time for control implementation

  11. Environmental impact assessment of transportation projects: An analysis using an integrated GIS, remote sensing, and spatial modeling approach

    Science.gov (United States)

    El-Gafy, Mohamed Anwar

    Transportation projects will have impact on the environment. The general environmental pollution and damage caused by roads is closely associated with the level of economic activity. Although Environmental Impact Assessments (EIAs) are dependent on geo-spatial information in order to make an assessment, there are no rules per se how to conduct an environmental assessment. Also, the particular objective of each assessment is dictated case-by-case, based on what information and analyses are required. The conventional way of Environmental Impact Assessment (EIA) study is a time consuming process because it has large number of dependent and independent variables which have to be taken into account, which also have different consequences. With the emergence of satellite remote sensing technology and Geographic Information Systems (GIS), this research presents a new framework for the analysis phase of the Environmental Impact Assessment (EIA) for transportation projects based on the integration between remote sensing technology, geographic information systems, and spatial modeling. By integrating the merits of the map overlay method and the matrix method, the framework analyzes comprehensively the environmental vulnerability around the road and its impact on the environment. This framework is expected to: (1) improve the quality of the decision making process, (2) be applied both to urban and inter-urban projects, regardless of transport mode, and (3) present the data and make the appropriate analysis to support the decision of the decision-makers and allow them to present these data to the public hearings in a simple manner. Case studies, transportation projects in the State of Florida, were analyzed to illustrate the use of the decision support framework and demonstrate its capabilities. This cohesive and integrated system will facilitate rational decisions through cost effective coordination of environmental information and data management that can be tailored to

  12. Navajo transmission project Draft Environmental Impact Statement (DEIS)

    International Nuclear Information System (INIS)

    1996-09-01

    Dine Power Authority, a Navajo Nation enterprise, proposes to construct a 500 kilovolt transmission line planned to deliver electrical power from the Shiprock Substation in northwestern New Mexico to either the Mead or the Marketplace Substation in southern Nevada. The line would relieve constraints on transmission of electricity west from the Four Comers area; improve operational flexibility and reliability of the overall system; and allow increased economical transfers, sales, and purchases in the Rocky Mountains/Four Comers/Desert Southwest region. Also, the project allows an opportunity for the Navajo Nation to participate in the electrical utility industry and promote economic development to benefit the people of the Navajo Nation. Alternatives considered include energy conservation and electric load management, new generation facilities, use of existing transmission systems, alternative transmission technologies, no action, and the proposed action. For the proposed action, several alternative routes and ancillary facility locations are addressed: four alternative routes and five substations in the eastern portion of the project area; and six alternative routes, three substation sites, and a microwave communication facility in the western portion of the project area. The existing condition of the environmental resources in the project area is described and potential impacts on those resources as a result of the proposed action are addressed. The impacts of the proposed action would be caused mainly by access roads, tower sites, and other associated facilities on soils, vegetation, wildlife, and cultural and paleontological resources, and the impact of the transmission line's presence on visual resources and land uses

  13. A cost/schedule and control system for the environmental restoration program Albuquerque Field Office

    International Nuclear Information System (INIS)

    Fiske, Wanda S.; Bischoff, Edward L.; Rea, Kenneth H.; Dwain Farley, P.; Biedermann, Charles A.

    1992-01-01

    The Department of Energy (DOE) Field Office Albuquerque (AL), Environmental Restoration Project Office (ERPO), has developed a project management system used to plan, document, and control Environmental Restoration (ER) work at eight installations and one superfund site managed by AL. This system emphasizes control of the cost, schedule, and technical elements of the Program. It supports programmatic documentation such as the Environmental Restoration/Waste Management Five-Year Plan, Site Specific Plan, and budget requests. The System provides information used to manage the ER Program at all levels of management (i.e., from low-level day-to-day activities to high-level upper management). The System requires substantial effort to ensure reliability; however, the benefit to ERPO is an effective, proactive project management tool. This paper provides an overview of the ERPO System, an explanation of how it is implemented, and lessons learned from this process. Application of the System to cost estimating, annual and five-year budget preparation, resource projections, scheduling, and cost/schedule performance measurement is discussed. Also discussed are cost/schedule review procedures, along with variance identification and resolution. Examples are taken from the Pinellas ER Program. (author)

  14. The quality of Portuguese Environmental Impact Studies: The case of small hydropower projects

    International Nuclear Information System (INIS)

    Pinho, Paulo; Maia, Rodrigo; Monterroso, Ana

    2007-01-01

    In most Environmental Impact Assessment (EIA) systems environmental authorities can stop an EIA process by refusing the respective EIA Report, on the grounds of technical or methodological insufficiencies identified in the review procedure. However, often times, it cannot be taken for granted that, once an EIA Report is formally accepted, as part of an EIA process, its quality standard is, consistently, of a satisfactory level. This paper summarises the results of a one-year research project aimed at assessing the quality of EIA studies carried out for small hydropower plants in Portugal. An extensive survey was carried out to analyse all EIA Reports that were the basis of successful EIA processes involving this kind of small scale projects, under the old and the new national EIA legislation, that is, over the last two decades. Often times unnoticeable to the general public and the media, located in isolated areas upstream secondary rivers, these projects are likely to generate some significant environmental impacts, in particular on the aesthetics value and character of local landscapes and on pristine ecological habitats. And yet, they are usually regarded as environmental friendly projects designed to produce emission free energy. The design of the evaluation criteria benefited from the literature review on similar research projects carried out in other EU countries. The evaluation exercise revealed a number of technical and methodological weaknesses in a significant percentage of cases. A set of simple and clear cut recommendations is proposed twofold: to improve the current standard of EIA practice and to strengthen the role of the so called EIA Commissions, at the crucial review stage of the EIA process

  15. Role of Hydrogeology in Professional Environmental Projects

    Science.gov (United States)

    The purpose of this presentation is to acquaint hydrogeology students how hydrogeological principles are applied in environmental engineering projects. This presentation outlines EPA's Superfund processes of site characterization, feasibility studies, and remediation processes.

  16. Environmental education project 'Mico-Estrela Track'

    Energy Technology Data Exchange (ETDEWEB)

    Vicente, Ana Paula Camargo de; Magalhaes, Milton Pinto Magalhaes; Silva, Simone Rodrigues da; Pinheiro, Roberta Vieira Nunes; Torres, Carlos Alberto Rodrigues; Silveira, Jeanete [PETROBRAS Transporte S.A. (TRANSPETRO), Rio de Janeiro, RJ (Brazil)

    2009-12-19

    Senador Canedo fuel storage terminal is situated in the Cerrado biome and implements the policy of promoting improvements in the preservation of its Green Belt by working out the Environmental Education Project 'Mico-Estrela7 Track', aimed at stimulating the preservation, protection, landscape beauty and defense of scientific sources of the Cerrado through environmental sensibilization and rational use of the existing natural resources. In the area of the track (1.5 ha) alone 352 plants have been identified, totaling 97 different species that are distributed in 36 families. The implementation of the project will contribute to strengthen the relations with the local community, like dwellers, teachers and pupils of the municipal network of Senador Canedo, as well as co-workers of the unit, thus reaffirming the commitment of the company to socio-environmental responsibility. (author)

  17. The Effect of Environmental Science Projects on Students' Environmental Knowledge and Science Attitudes

    Science.gov (United States)

    Al-Balushi, Sulaiman M.; Al-Aamri, Shamsa S.

    2014-01-01

    The current study explores the effectiveness of involving students in environmental science projects for their environmental knowledge and attitudes towards science. The study design is a quasi-experimental pre-post control group design. The sample was 62 11th-grade female students studying at a public school in Oman. The sample was divided into…

  18. Hellsgate Winter Range : Wildlife Mitigation Project. Preliminary Environmental Assessment.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1995-01-01

    The Bonneville Power Administration proposes funding the Hellsgate Winter Range Wildlife Mitigation Project in cooperation with the Colville Convederated Tribes and Bureau of Indian Affairs. This Preliminary Environmental Assessment examines the potential environmental effects of acquiring and managing property for wildlife and wildlife habitat within a large project area. The Propose action is intended to meet the need for mitigation of wildlife and wild life habitat that was adversely affected by the construction of Grand Coulee and Chief Joseph Dams and their reservoirs.

  19. Assessing Environmental Impact Indicators in Road Construction Projects in Developing Countries

    OpenAIRE

    Mohamed Marzouk; Mohamed El-zayat; Ahmed Aboushady

    2017-01-01

    Environmental pollution is considered to be one of the main concerns in the construction industry. Environmental pollution has become a major challenge to construction projects due to the huge amount of pollution caused by construction projects. There are different types of environmental impact indicators, such as the greenhouse gas (GHG) footprint, eutrophication potential (EP), acidification potential (AP), human health (HH) particulate, ozone depletion, and smog. Each of these environmenta...

  20. Environmental Impact Assessment of a Water Transfer Project

    Directory of Open Access Journals (Sweden)

    Pazoki

    2015-07-01

    Full Text Available Background Reliable water supplies for drinking and agriculture are some of the objectives for the sustainable development of every country. However, constructed facilities such as dams and irrigation networks and drainage can exert positive and negative effects directly or indirectly on the environment. The environmental impact assessment is a method for identifying the positive and negative effects caused by a plan and suggests performance management best practices aimed at lessening the negative impacts and augmenting the positive ones. Objectives The present study sought to evaluate the environmental impacts of the water transfer project of the Jooban Dam in two phases of preparation and operation. Materials and Methods A checklist containing the positive, negative, short-term, and long-term effects as well as the continuation and probable occurrence of these effects was used. Results The results showed that the negative environmental and social impacts of the project outweighed the positive impacts in terms of type, number, and intensity. Conclusions Unless there are well-thought out strategies for minimizing the undesirable impact on the environment, it is not advisable that such projects be permitted.

  1. Final report Hanford environmental compliance project 89-D-172

    International Nuclear Information System (INIS)

    Kelly, J.R.

    1996-01-01

    The Hanford Environmental Compliance (HEC) Project is unique in that it consisted of 14 subprojects which varied in project scope and were funded from more that one program. This report describes the HEC Project from inception to completion and the scope, schedule, and cost of the individual subprojects. Also provided are the individual subproject Cost closing statements and Project completion reports accompanied by construction photographs and illustrations

  2. Development of Distributed Research Center for monitoring and projecting regional climatic and environmental changes: first results

    Science.gov (United States)

    Gordov, Evgeny; Shiklomanov, Alexander; Okladinikov, Igor; Prusevich, Alex; Titov, Alexander

    2016-04-01

    Description and first results of the cooperative project "Development of Distributed Research Center for monitoring and projecting of regional climatic and environmental changes" recently started by SCERT IMCES and ESRC UNH are reported. The project is aimed at development of hardware and software platform prototype of Distributed Research Center (DRC) for monitoring and projecting regional climatic and environmental changes over the areas of mutual interest and demonstration the benefits of such collaboration that complements skills and regional knowledge across the northern extratropics. In the framework of the project, innovative approaches of "cloud" processing and analysis of large geospatial datasets will be developed on the technical platforms of two U.S. and Russian leading institutions involved in research of climate change and its consequences. Anticipated results will create a pathway for development and deployment of thematic international virtual research centers focused on interdisciplinary environmental studies by international research teams. DRC under development will comprise best features and functionality of earlier developed by the cooperating teams' information-computational systems RIMS (http://rims.unh.edu) and CLIMATE(http://climate.scert.ru/), which are widely used in Northern Eurasia environment studies. The project includes several major directions of research (Tasks) listed below. 1. Development of architecture and defining major hardware and software components of DRC for monitoring and projecting of regional environmental changes. 2. Development of an information database and computing software suite for distributed processing and analysis of large geospatial data hosted at ESRC and IMCES SB RAS. 3. Development of geoportal, thematic web client and web services providing international research teams with an access to "cloud" computing resources at DRC; two options will be executed: access through a basic graphical web browser and

  3. Atmosphere Resource Recovery & Environmental Monitoring for Long Duration Exploration Project

    Data.gov (United States)

    National Aeronautics and Space Administration — The AES Atmosphere Resource Recovery & Environmental Monitoring (ARREM) for Long Duration Exploration Project project is maturing Atmosphere Revitalization...

  4. Curricular Reform: Systems Modeling and Sustainability in Civil and Environmental Engineering at the University of Vermont

    Science.gov (United States)

    Rizzo, D. M.; Hayden, N. J.; Dewoolkar, M.; Neumann, M.; Lathem, S.

    2009-12-01

    Researchers at the University of Vermont were awarded a NSF-sponsored Department Level Reform (DLR) grant to incorporate a systems approach to engineering problem solving within the civil and environmental engineering programs. A systems approach challenges students to consider the environmental, social, and economic aspects within engineering solutions. Likewise, sustainability requires a holistic approach to problem solving that includes economic, social and environmental factors. Our reform has taken a multi-pronged approach in two main areas that include implementing: a) a sequence of three systems courses related to environmental and transportation systems that introduce systems thinking, sustainability, and systems analysis and modeling; and b) service-learning (SL) projects as a means of practicing the systems approach. Our SL projects are good examples of inquiry-based learning that allow students to emphasize research and learning in areas of most interest to them. The SL projects address real-world open-ended problems. Activities that enhance IT and soft skills for students are incorporated throughout the curricula. Likewise, sustainability has been a central piece of the reform. We present examples of sustainability in the SL and modeling projects within the systems courses (e.g., students have used STELLA™ systems modeling software to address the impact of different carbon sequestration strategies on global climate change). Sustainability in SL projects include mentoring home schooled children in biomimicry projects, developing ECHO exhibits and the design of green roofs, bioretention ponds and porous pavement solutions. Assessment includes formative and summative methods involving student surveys and focus groups, faculty interviews and observations, and evaluation of student work.

  5. Stuart oil shale project stage two: executive summary: draft environmental impact statement

    International Nuclear Information System (INIS)

    1999-09-01

    The project is an oil shale open pit mine and processing operation that is currently being commissioned 15 km north of Gladstone, Queensland, Australia, and is owned as a joint venture by Southern Pacific Petroleum N.L., Central Pacific Minerals N.L, and Suncor Energy Inc., a leading Canadian company that is an integrated energy company. The results of a comprehensive investigation are included of the potential environmental impacts of the project, and which are described in the Draft Environmental Impact Statement (EIS). In stage two, there is included the existing mine expansion as well as the construction of an additional process plant based around a larger commercial scale ATP oil shale processing plant. The new stage two operation will be developed next to and integral with services and infrastructure provided for stage one. Described are: the assessment process, regulatory framework and the project area, the needs for an alternative to the project, the proposal itself, the existing natural, social and economic impacts, and the environmental impacts as well as plans for their mitigation. In appendices there are included a draft environmental management overview strategy and an environmental management plan. The elements covered in the report by section are: background, need for the project, the proponent, legislation and approvals, project description, environmental issues and impact management

  6. A method to the impact assessment of the returning grazing land to grassland project on regional eco-environmental vulnerability

    International Nuclear Information System (INIS)

    Shao, Huaiyong; Sun, Xiaofei; Wang, Haoxue; Zhang, Xiaoxue; Xiang, Zhiying; Tan, Rui; Chen, Xuanyi; Xian, Wei; Qi, Jiaguo

    2016-01-01

    The Chinese government has conducted the Returning Grazing Land to Grassland Project (RGLGP) across large portions of grasslands from western China since 2003. In order to explore and understand the impact in the grassland's eco-environment during the RGLGP, we utilized Projection Pursuit Model (PPM) and Geographic Information System (GIS) to develop a spatial assessment model to examine the ecological vulnerability of the grassland. Our results include five indications: (1) it is practical to apply the spatial PPM on ecological vulnerability assessment for the grassland. This methodology avoids creating an artificial hypothesis, thereby providing objective results that successfully execute a multi-index assessment process and analysis under non-linear systems in eco-environments; (2) the spatial PPM is not only capable of evaluating regional eco-environmental vulnerability in a quantitative way, but also can quantitatively demonstrate the degree of effect in each evaluation index for regional eco-environmental vulnerability; (3) the eco-environment of the Xianshui River Basin falls into the medium range level. The normalized difference vegetation index (NDVI) and land use cover and change (LUCC) crucially influence the Xianshui River Basin's eco-environmental vulnerability. Generally, in the Xianshui River Basin, regional eco-environmental conditions improved during 2000 and 2010. The RGLGP positively affected NDVI and LUCC structure, thereby promoting the enhancement of the regional eco-environment; (4) the Xianshui River Basin divides its ecological vulnerability across different levels; therefore our study investigates three ecological regions and proposes specific suggestions for each in order to assist in eco-environmental protection and rehabilitation; and lastly that (5) the spatial PPM established by this study has the potential to be applied on all types of grassland eco-environmental vulnerability assessments under the RGLGP and under the similar

  7. A method to the impact assessment of the returning grazing land to grassland project on regional eco-environmental vulnerability

    Energy Technology Data Exchange (ETDEWEB)

    Shao, Huaiyong, E-mail: huaiyongshao@163.com [Key Laboratory of Geoscience Spatial Information Technology, Ministry of Land and Resources of China, Chengdu University of Technology, Chengdu 610059, Sichuan (China); Center for Global Change and Earth Observations, Michigan State University, East Lansing 48823, MI (United States); Sun, Xiaofei; Wang, Haoxue; Zhang, Xiaoxue [Key Laboratory of Geoscience Spatial Information Technology, Ministry of Land and Resources of China, Chengdu University of Technology, Chengdu 610059, Sichuan (China); Xiang, Zhiying [School of Earth Sciences, Zhejiang University, Hangzhou 310027, Zhejiang (China); Tan, Rui; Chen, Xuanyi [Key Laboratory of Geoscience Spatial Information Technology, Ministry of Land and Resources of China, Chengdu University of Technology, Chengdu 610059, Sichuan (China); Xian, Wei [College of Resources and Environment, Chengdu University of Information Technology, Chengdu 610225, Sichuan (China); Qi, Jiaguo [Center for Global Change and Earth Observations, Michigan State University, East Lansing 48823, MI (United States)

    2016-01-15

    The Chinese government has conducted the Returning Grazing Land to Grassland Project (RGLGP) across large portions of grasslands from western China since 2003. In order to explore and understand the impact in the grassland's eco-environment during the RGLGP, we utilized Projection Pursuit Model (PPM) and Geographic Information System (GIS) to develop a spatial assessment model to examine the ecological vulnerability of the grassland. Our results include five indications: (1) it is practical to apply the spatial PPM on ecological vulnerability assessment for the grassland. This methodology avoids creating an artificial hypothesis, thereby providing objective results that successfully execute a multi-index assessment process and analysis under non-linear systems in eco-environments; (2) the spatial PPM is not only capable of evaluating regional eco-environmental vulnerability in a quantitative way, but also can quantitatively demonstrate the degree of effect in each evaluation index for regional eco-environmental vulnerability; (3) the eco-environment of the Xianshui River Basin falls into the medium range level. The normalized difference vegetation index (NDVI) and land use cover and change (LUCC) crucially influence the Xianshui River Basin's eco-environmental vulnerability. Generally, in the Xianshui River Basin, regional eco-environmental conditions improved during 2000 and 2010. The RGLGP positively affected NDVI and LUCC structure, thereby promoting the enhancement of the regional eco-environment; (4) the Xianshui River Basin divides its ecological vulnerability across different levels; therefore our study investigates three ecological regions and proposes specific suggestions for each in order to assist in eco-environmental protection and rehabilitation; and lastly that (5) the spatial PPM established by this study has the potential to be applied on all types of grassland eco-environmental vulnerability assessments under the RGLGP and under the

  8. Uranium Mill Tailings Remedial Action Project. 1995 Environmental Report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-06-01

    In accordance with U.S. Department of Energy (DOE) Order 23 1. 1, Environment, Safety and Health Reporting, the DOE prepares an annual report to document the activities of the Uranium Mill Tailings Remedial Action (UMTRA) Project environmental monitoring program. This monitoring must comply with appropriate laws, regulations, and standards, and it must identify apparent and meaningful trends in monitoring results. The results of all monitoring activities must be communicated to the public. The UMTRA Project has prepared annual environmental reports to the public since 1989.

  9. Uranium Mill Tailings Remedial Action Project. 1995 Environmental Report

    International Nuclear Information System (INIS)

    1996-06-01

    In accordance with U.S. Department of Energy (DOE) Order 23 1. 1, Environment, Safety and Health Reporting, the DOE prepares an annual report to document the activities of the Uranium Mill Tailings Remedial Action (UMTRA) Project environmental monitoring program. This monitoring must comply with appropriate laws, regulations, and standards, and it must identify apparent and meaningful trends in monitoring results. The results of all monitoring activities must be communicated to the public. The UMTRA Project has prepared annual environmental reports to the public since 1989

  10. Lower Yakima Valley Wetlands and Riparian Restoration Project. Final environmental assessment

    International Nuclear Information System (INIS)

    1994-01-01

    Bonneville Power Administration (BPA) proposes to fund that portion of the Washington Wildlife Mitigation Agreement pertaining to the Lower Yakima Valley Wetlands and Riparian Restoration Project (Project) in a cooperative effort with the Yakama Indian Nation and the Bureau of Indian Affairs (BIA). The proposed action would allow the sponsors to secure property and conduct wildlife management activities for the Project within the boundaries of the Yakama Indian Reservation. This Environmental Assessment examines the potential environmental effects of acquiring and managing property for wildlife and wildlife habitat within a large 20, 340 hectare (50, 308 acre) project area. As individual properties are secured for the Project, three site-specific activities (habitat enhancement, operation and maintenance, and monitoring and evaluation) may be subject to further site-specific environmental review. All required Federal/Tribal coordination, permits and/or approvals would be obtained prior to ground disturbing activities

  11. Lower Yakima Valley Wetlands and Riparian Restoration Project. Final Environmental Assessment.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration

    1994-10-01

    Bonneville Power Administration (BPA) proposes to fund that portion of the Washington Wildlife Mitigation Agreement pertaining to the Lower Yakima Valley Wetlands and Riparian Restoration Project (Project) in a cooperative effort with the Yakama Indian Nation and the Bureau of Indian Affairs (BIA). The proposed action would allow the sponsors to secure property and conduct wildlife management activities for the Project within the boundaries of the Yakama Indian Reservation. This Environmental Assessment examines the potential environmental effects of acquiring and managing property for wildlife and wildlife habitat within a large 20, 340 hectare (50, 308 acre) project area. As individual properties are secured for the Project, three site-specific activities (habitat enhancement, operation and maintenance, and monitoring and evaluation) may be subject to further site-specific environmental review. All required Federal/Tribal coordination, permits and/or approvals would be obtained prior to ground disturbing activities.

  12. Integrating Environmental and Information Systems Management: An Enterprise Architecture Approach

    Science.gov (United States)

    Noran, Ovidiu

    Environmental responsibility is fast becoming an important aspect of strategic management as the reality of climate change settles in and relevant regulations are expected to tighten significantly in the near future. Many businesses react to this challenge by implementing environmental reporting and management systems. However, the environmental initiative is often not properly integrated in the overall business strategy and its information system (IS) and as a result the management does not have timely access to (appropriately aggregated) environmental information. This chapter argues for the benefit of integrating the environmental management (EM) project into the ongoing enterprise architecture (EA) initiative present in all successful companies. This is done by demonstrating how a reference architecture framework and a meta-methodology using EA artefacts can be used to co-design the EM system, the organisation and its IS in order to achieve a much needed synergy.

  13. Ontario Hydro's environmental monitoring program for HV [high voltage] transmission line projects

    International Nuclear Information System (INIS)

    Braekevelt, P.N.

    1991-01-01

    Responsible monitoring and control of environmental impacts is key to obtaining future needed approvals for new high voltage (HV) transmission line projects. Ontario Hydro's environmental monitoring program was developed as a highly structured, self-imposed monitoring system to relieve government agencies of the responsibility of developing a similar external program. The goal was to be self-policing. The historical development, program structure, standards, priority ratings, documentation, communication and computerization of the program is described. The most effective way to minimize environmental impacts is to avoid sensitive features at the route selection stage, well before any construction takes place. The environmental monitoring program is based on the following blueprint: each crew member is responsible for environmental protection; environmental problems are to be resolved at the lowest level possible; potential concerns should be resolved before they become problems; known problems should be dealt with quickly to minimize impacts; team members should work cooperatively; and formal and regular communication is emphasized

  14. Environmental impact statement for the proposed Great Whale River Hydroelectric Project

    International Nuclear Information System (INIS)

    1992-01-01

    Guidelines are presented on the preparation of the environmental impact statement for the Great Whale hydroelectric project by Hydro-Quebec. The statement must include a project justification, description of the biophysical and social environments, a project description, and must address project impacts, mitigative and compensatory measures, environmental surveillance, monitoring, and long-term management programs. Appendices include a memorandum of understanding, list of members of the review bodies, list of briefs submitted at the public scoping hearings, and a list of public comments on the draft guidelines. 17 figs

  15. Implementing the theories: A fully integrated project control system that's implemented and works

    International Nuclear Information System (INIS)

    Harris, R.E.

    1994-01-01

    Using the theories presented in DOE Orders 4700.1, 1332.1A, and Notice 4700.5 as the basis for system design, the Fernald Environmental Restoration Management Corporation (FERMCO) has developed and implemented a Project Control System (PCS) that complies with requirements and provides DOE and FERMCO management with timely performance measurement information. To this extent, the FERMCO PCS probably is similar to the systems of the majority of the contractors in the DOE complex. In fact. this facet of the FERMCO PCS generally mirrors those used on projects around the world by FERMCO's parent company, Fluor Daniel. Starting with this open-quotes platformclose quotes, the vision and challenge of creating a fully integrated system commenced. An open-architecture systems approach is the factor that most greatly influenced and enabled the successful development and implementation of the Project Control System for the Fernald Environmental Management Project. All aspects of a fully integrated system were considered during the design phase. The architecture of the FERMCO system enables seamless, near real-time, transfer of data both from and to the Project Control System with all other related systems. The primary systems that provide and share data with the Project Control System include those used by the Payroll, Accounting, Procurement, and Human Resources organizations. To enable data linking with these organizations, the resource codes were designed to map many-to-one from their detailed codes to the summarized codes used in the PCS

  16. Integrated Display and Environmental Awareness System - System Architecture Definition

    Science.gov (United States)

    Doule, Ondrej; Miranda, David; Hochstadt, Jake

    2017-01-01

    The Integrated Display and Environmental Awareness System (IDEAS) is an interdisciplinary team project focusing on the development of a wearable computer and Head Mounted Display (HMD) based on Commercial-Off-The-Shelf (COTS) components for the specific application and needs of NASA technicians, engineers and astronauts. Wearable computers are on the verge of utilization trials in daily life as well as industrial environments. The first civil and COTS wearable head mounted display systems were introduced just a few years ago and they probed not only technology readiness in terms of performance, endurance, miniaturization, operability and usefulness but also maturity of practice in perspective of a socio-technical context. Although the main technical hurdles such as mass and power were addressed as improvements on the technical side, the usefulness, practicality and social acceptance were often noted on the side of a broad variety of humans' operations. In other words, although the technology made a giant leap, its use and efficiency still looks for the sweet spot. The first IDEAS project started in January 2015 and was concluded in January 2017. The project identified current COTS systems' capability at minimum cost and maximum applicability and brought about important strategic concepts that will serve further IDEAS-like system development.

  17. Proposed Tenaska Washington II Generation Project : Final Environmental Impact Statement. Volume 1: Environmental Analysis and Technical Appendices.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1994-01-01

    BPA is considering whether to purchase electrical power from a proposed privately-owned combustion-turbine electrical generation plant in Washington. The plant would be fired by natural gas and would use combined-cycle technology to generate 240 average megawatts (aMW) of energy. The plant would be developed, owned, and operated by Tenaska Washington Partners II, L.P. The project would be located about 19 kilometers (12 miles) southeast of downtown Tacoma in the Frederickson Industrial Area, Pierce County. The proposed plant would occupy about half of a 6.4-hectare (16-acre) parcel and would be consistent with the industrial character of its surroundings. The proposed site is currently undeveloped and zoned for industrial use by the county. Main environmental concerns identified in the scoping process and in comments on the Draft Environmental Impact Statement (EIS) include: (1) potential air quality impacts, such as emissions and their contribution to the {open_quotes}greenhouse{close_quotes} effect; (2) potential health and safety impacts, such as nuisance odors, plant safety, visibility and heat-emission systems which may affect low-flying planes and potential health effects of electric and magnetic fields; and (3) potential water quality and quantity impacts, such as the amount of wastewater to be discharged, the source and amount of water required for plant operation. These and other issues are discussed in detail in the EIS. The proposed project already includes many features designed to reduce environmental impacts. Based on investigations performed for the EIS, no significant unavoidable adverse environmental impacts associated with the proposed project were identified, and no evidence emerged to suggest that the proposed action is controversial. The EIS is being mailed to numerous agencies, groups, and individuals (see Section 8.0). There will be a 30-day no-action period before any decisions are made and the Record of Decision is signed.

  18. The Florida Ranchlands Environmental Services Project: Field Testing a Pay-for-Environmental-Services Program

    OpenAIRE

    Lynch, S.; Shabman, L.

    2007-01-01

    The Florida Ranchlands Environmental Services Project (FRESP) was recently launched, which will field test a program to complement the existing restoration programs such as the Lake Okeechobee Protection Plan (LOPP), which uses public funding to build treatment wetlands, drill aquifer storage, and capture rainwater (to delay its arrival downstream). FRESP will pay cattle ranchers to provide environmental services that will benefit the lake. PES-1 (Payments for Environmental Services Associ...

  19. Uranium Mill Tailings Remedial Action Project environmental protection implementation plan

    International Nuclear Information System (INIS)

    1994-10-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Environmental Protection Implementation Plan (EPIP) has been prepared in accordance with the requirements of the U.S. Department of Energy (DOE) Order 5400.1. The UMTRA EPIP is updated annually. This version covers the time period of 9 November 1994, through 8 November 1995. Its purpose is to provide management direction to ensure that the UMTRA Project is operated and managed in a manner that will protect, maintain, and where necessary, restore environmental quality, minimize potential threats to public health and the environment, and comply with environmental regulations and DOE policies

  20. Uranium Mill Tailings Remedial Action Project environmental protection implementation plan

    Energy Technology Data Exchange (ETDEWEB)

    1994-10-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Environmental Protection Implementation Plan (EPIP) has been prepared in accordance with the requirements of the U.S. Department of Energy (DOE) Order 5400.1. The UMTRA EPIP is updated annually. This version covers the time period of 9 November 1994, through 8 November 1995. Its purpose is to provide management direction to ensure that the UMTRA Project is operated and managed in a manner that will protect, maintain, and where necessary, restore environmental quality, minimize potential threats to public health and the environment, and comply with environmental regulations and DOE policies.

  1. Environmentally Responsible Aviation Project

    Data.gov (United States)

    National Aeronautics and Space Administration — Created in 2009 as part of NASA's Aeronautics Research Mission Directorate's Integrated Systems Research Program, the Environmentally Responsible Aviation...

  2. Navajo transmission project. Final Environmental Impact Statement (FEIS)

    International Nuclear Information System (INIS)

    1997-08-01

    Dine Power Authority, a Navajo Nation enterprise, proposes to construct a 500 kilovolt transmission line planned to deliver electrical power from the Shiprock Substation in northwestern New Mexico to the Marketplace Substation in southern Nevada. The line would relieve constraints on transmission of electricity west from the Four Corners area; improve operational flexibility and reliability of the overall system; and allow increased economical transfers, sales, and purchases in the Rocky Mountains/Four Corners/Desert Southwest region. Also, the project allows an opportunity for the Navajo Nation to participate in the electrical utility industry and promote economic development to benefit the people of the Navajo Nation. Six alternatives were considered and include (1) energy conservation and electric load management, (2) new generation facilities, (3) use of existing transmission systems, (4) alternative transmission technologies, (5) no action, and (6) the proposed action. For the proposed action, the following alternative routes and ancillary facility locations are addressed in the EIS: four alternative routes and five substations in the eastern portion of the project area; and six alternative routes, three substation sites, and a microwave communication facility in the western portion of the project area. The existing condition of the environmental resources in the project area is described, and potential impacts on those resources as a result of the proposed action are addressed. The impacts of the proposed action would be caused mainly by access roads, tower sites, and other associated facilities on soils, vegetation, wildlife, and cultural and paleontological resources; and the impact of the transmission line's presence on visual resources and land uses. Public comments on the draft EIS are addressed in this FEIS

  3. Wuskwatim generation project : Canadian Environmental Assessment Act comprehensive study report

    International Nuclear Information System (INIS)

    2005-10-01

    This study report described the plan by Manitoba Hydro and the Nisichawayasihk Cree Nation (NCN) to construct a new 200- megawatt (MW) generating station at Taskinigup Falls on the Burntwood River, near the outlet of Wuskwatim Lake. This hydroelectric power project will allow Manitoba Hydro to meet its projected energy needs within the next two decades as identified in its 2002/03 Power Resource Plan. It will also allow Manitoba Hydro and NCN to obtain additional export revenues and profits by advancing the in-service date of the Project from 2020 to 2009. A formal environmental assessment is required under the Canadian Environmental Assessment Act (CEAA) because Fisheries and Oceans Canada (DFO) has determined that the Project would cause fish habitat losses requiring an authorization under the Fisheries Act. Many of the structures to be built in navigable waters would also require formal approval under the Navigable Waters Protection Act (NWPA), which has prompted this application of the CEAA. This environmental assessment report has been prepared by DFO in consultation with Transport Canada and other federal authorities concerned. It provides a summary of the Wuskwatim Generation Project and the environment in which it will be built and operated. In addition, the results of public consultations are discussed. It presents an assessment of the Project's influence on fish and fish habitat, birds, species at risk, human health (local air quality, quality of drinking water and consumption of fishery products), navigation, use of renewable resources, and current use of lands and resources for traditional purposes by Aboriginal persons (hunting, trapping, gathering, subsistence fishing and heritage sites). It was concluded that the proposed Project, as defined by the scope of the study, is not likely to cause significant adverse environmental effects. 45 refs., 5 tabs., 13 figs., 3 appendices

  4. Environmental assessment, expanded Ponnequin wind energy project, Weld County, Colorado

    International Nuclear Information System (INIS)

    1999-02-01

    The US Department of Energy (DOE) has considered a proposal from the State of Colorado, Office of Energy Conservation (OEC), for funding construction of the Expanded Ponnequin Wind Project in Weld County, Colorado. OEC plans to enter into a contracting arrangement with Public Service Company of Colorado (PSCo) for the completion of these activities. PSCo, along with its subcontractors and business partners, are jointly developing the Expanded Ponnequin Wind Project. The purpose of this Final Environmental Assessment (EA) is to provide DOE and the public with information on potential environmental impacts associated with the Expanded Ponnequin Wind Energy Project. This EA, and public comments received on it, were used in DOE's deliberations on whether to release funding for the expanded project under the Commercialization Ventures Program

  5. Environmental assessment, expanded Ponnequin wind energy project, Weld County, Colorado

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-02-01

    The US Department of Energy (DOE) has considered a proposal from the State of Colorado, Office of Energy Conservation (OEC), for funding construction of the Expanded Ponnequin Wind Project in Weld County, Colorado. OEC plans to enter into a contracting arrangement with Public Service Company of Colorado (PSCo) for the completion of these activities. PSCo, along with its subcontractors and business partners, are jointly developing the Expanded Ponnequin Wind Project. The purpose of this Final Environmental Assessment (EA) is to provide DOE and the public with information on potential environmental impacts associated with the Expanded Ponnequin Wind Energy Project. This EA, and public comments received on it, were used in DOE`s deliberations on whether to release funding for the expanded project under the Commercialization Ventures Program.

  6. Coyote Springs Cogeneration Project, Morrow County, Oregon: Draft Environmental Impact Statement.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1994-01-01

    BPA is considering whether to transfer (wheel) electrical power from a proposed privately-owned, combustion-turbine electrical generation plant in Oregon. The plant would be fired by natural gas and would use combined-cycle technology to generate up to 440 average megawatts (aMW) of energy. The plant would be developed, owned, and operated by Portland General Electric Company (PGE). The project would be built in eastern Oregon, just east of the City of Boardman in Morrow County. The proposed plant would be built on a site within the Port of Morrow Industrial Park. The proposed use for the site is consistent with the County land use plan. Building the transmission line needed to interconnect the power plant to BPA`s transmission system would require a variance from Morrow County. BPA would transfer power from the plant to its McNary-Slatt 500-kV transmission line. PGE would pay BPA for wheeling services. Key environmental concerns identified in the scoping process and evaluated in the draft Environmental Impact Statement (DEIS) include these potential impacts: (1) air quality impacts, such as emissions and their contributions to the {open_quotes}greenhouse{close_quotes} effect; (2) health and safety impacts, such as effects of electric and magnetic fields, (3) noise impacts, (4) farmland impacts, (5) water vapor impacts to transportation, (6) economic development and employment impacts, (7) visual impacts, (8) consistency with local comprehensive plans, and (9) water quality and supply impacts, such as the amount of wastewater discharged, and the source and amount of water required to operate the plant. These and other issues are discussed in the DEIS. The proposed project includes features designed to reduce environmental impacts. Based on studies completed for the DEIS, adverse environmental impacts associated with the proposed project were identified, and no evidence emerged to suggest that the proposed action is controversial.

  7. Near-facility environmental monitoring quality assurance project plan

    International Nuclear Information System (INIS)

    McKinney, S.M.

    1997-01-01

    This Quality Assurance Project Plan addresses the quality assurance requirements for the activities associated with the preoperational and near facility environmental monitoring performed by Waste Management Federal Services, Inc., Northwest Operations and supersedes WHC-EP-0538-2. This plan applies to all sampling and monitoring activities performed by waste management Federal Services, Inc., Northwest Operations in implementing facility environmental monitoring at the Hanford Site

  8. MATHEMATICAL MODEL DESIGNATED FOR THE ASSESSMENT OF THE INTEGRATED ENVIRONMENTAL LOAD PRODUCED BY A BUILDING PROJECT

    Directory of Open Access Journals (Sweden)

    Lapidus Azariy Abramovich

    2012-10-01

    The theoretical background of the proposed approach consists in an integrated methodology implemented in the system engineering of construction projects. A building system may be represented as the aggregate of all stages of construction works and participants involved in them. The building system is object-oriented, and it is implemented under the impact of pre-determined environmental factors. The core constituent of the building system represents a Production Technology Module (PTM, or summarized groups of processes. The model formula designated for the assessment of the intensity of the ecological load produced by the construction project onto the environment may be represented as follows:

  9. Environmental impact assessment of Kachchh tidal power project

    International Nuclear Information System (INIS)

    Yadav, Ramanand; Lal, B.B.

    1995-01-01

    The Kachchh tidal power development project is a single-basin, single -effect and ebb generation development by construction of a tidal power barrage of about 3.25 km length across Hansthal creek. The project may disturb the ecosystem of the region. The paper deals in detail the environmental impacts of the project on climate, water velocity, flow and sedimentation pattern, water quality, flora and fauna, fishery, tourism and recreation, wild life, public health and socio-economic conditions. (author). 4 refs., 1 fig., 2 tabs

  10. Interdisciplinary Project-Based Learning through an Environmental Water Quality Study

    Science.gov (United States)

    Juhl, Lorie; Yearsley, Kaye; Silva, Andrew J.

    1997-12-01

    An interdisciplinary environmental water quality study was designed and conducted to enhance training and employability of chemical and environmental technician students in associate degree programs. Four project objectives were identified as a means to enhance the educational experience and employability of our students: provide experience on analytical instrumentation for organic compounds (gas chromatography/mass spectrometry, GC/MS), require interdisciplinary group interactions and problem solving, provide experience with Environmental Protection Agency (EPA) procedures, and require cooperation with state agencies/private organizations. Students worked in groups that included representatives from both programs to develop project objectives and a Sampling and Analysis Plan (SAP) following EPA standards. Input from personnel at Idaho's Department of Environmental Quality and Bureau of Laboratories and from volunteers in an environmental "watch dog" organization called the Henry's Fork Foundation aided students in the development and implementation of their SAP. Subsequently, groups sampled sections of the Henry's Fork River and analyzed for organic, inorganic, and fecal contaminants. Analysis included EPA method 525.2 for pesticides using GC/MS. Data from all river segments was shared and each group submitted a final report analyzing results. Surveys completed by students and instructors indicate that the project is a successful teaching method allowing introduction of new skills as well as review of important technical and employability skills.

  11. Management of environmental and radiation data - the Olympic Dam project

    International Nuclear Information System (INIS)

    Jenkins, B.

    1987-01-01

    In terms of data management the Olympic Dam Project is in a process of transition from investigative studies to operational monitoring. The data management requirements for investigative studies are quite different requirements and indicates the progress taken in this transition, as well as the directions being taken to complete this transition. The environmental and radiation management programs for the Olympic Dam Project have already stored 70 megabytes of data on computer. With the comprehensive monitoring requirements which have been, or are in the process of being established for production operations, the volume of data is increasing. There are six main areas involving environmental and radiation data management: project area environmental monitoring; monitoring of the impact pathway from groundwater extraction for water supply to possible effects on mound springs; radiation levels in the environment; radiation exposures to designated employees; other occupational exposures in the mine; medical records relevant to occupational health

  12. Interim report for SNL/NM environmental drilling project

    Energy Technology Data Exchange (ETDEWEB)

    Wemple, R.P.; Meyer, R.D. [Sandia National Labs., Albuquerque, NM (United States); Layne, R.R. [Charles Machine Works, Inc., Perry, OK (United States)

    1994-02-01

    Concern for the environment and cost reduction are the driving forces for a broad effort in government and the private sector to develop new, more cost-effective technologies for characterizing, monitoring and remediating environmental sites. Secondary goals of the characterization, monitoring and remediation (CMR) activity are: minimize secondary waste generation, minimize site impact, protect water tables, and develop methods/strategies to apply new technologies. The Sandia National Laboratories (SNL) project in directional boring for CMR of waste sites with enhanced machinery from the underground utility installation industry was initiated in 1990. Preliminary activities included surveying the directional drilling access needs of various DOE sites, identifying an existing class of machinery that could be enhanced for environmental work through development, and establishing a mutually beneficial working relationship with an industry partner. Since that time the project has tested a variety of prototype machinery and hardware built by the industrial partner, and SNL. The project continues to test and develop the machinery and technique refinements needed for future applications at DOE, DOD, and private sector sites. The original goal of cost-effectiveness is being met through innovation, adaptation, and application of fundamental concepts. Secondary goals are being met via a basic philosophy of ``cut/thrust and compact cuttings without adding large quantities of fluid`` to an environmental problem site. Technology transfer to the private sector is ongoing and ultimately should result in commercial availability of the machinery. Education of regulatory agencies resulting in restructuring appropriate regulatory standards for specification of the horizontal drilling techniques will be a final project goal.

  13. Evaluating construction projects of hotels based on environmental sustainability with MCDM framework

    Directory of Open Access Journals (Sweden)

    Sarfaraz Hashemkhani Zolfani

    2018-03-01

    Full Text Available Environmental issues have got incredible attention among daily life activities. Sustainability penetrated in all society practices specially construction industry due to its substantial impact on the environment. Monitoring and controlling architectural project contains a decision problem with multi-varieties analysis. This study aimed to evaluate construction projects of hotels regarding environmental sustainability. To this end, a hybrid Multiple Criteria Decision Making (MCDM model is proposed. Step‐wise Weight Assessment Ratio Analysis (SWARA and Complex proportional assessment (COPRAS compose a unified framework. A private construction project is supposed as a case study. The project is based on establishing a five star hotel in Tehran, Iran. In this research SWARA produces criteria weights and COPRAS will rank decision alternatives. This study can be a strategic route for other similar researches in other fields. Keywords: Architecture projects, Sustainability, Environmental sustainability, SWARA, COPRAS

  14. Environmental impact assessment for uranium mine, mill and in situ leach projects

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-11-01

    Environmental impact assessments and/or statements are an inherent part of any uranium mining project and are a prerequisite for the future opening of an exploitation and its final closure and decommissioning. Since they contain all information related to the physical, biological, chemical and economic condition of the areas where industrial projects are proposed or planned, they present invaluable guidance for the planning and implementation of environmental mitigation as well as environmental restoration after the mine is closed. They further yield relevant data on the socio-economic impacts of a project. The present report provides guidance on the environmental impact assessment of uranium mining and milling projects, including in situ leach projects which will be useful for companies in the process of planning uranium developments as well as for the regional or national authorities who will assess such developments. Additional information and advice is given through environmental case histories from five different countries. Those case histories are not meant to be prescriptions for conducting assessments nor even firm recommendations, but should serve as examples for the type and extent of work involved in assessments. A model assessment and licensing process is recommended based on the experience of the five countries. 1 fig., 5 tabs.

  15. Environmental impact assessment for uranium mine, mill and in situ leach projects

    International Nuclear Information System (INIS)

    1997-11-01

    Environmental impact assessments and/or statements are an inherent part of any uranium mining project and are a prerequisite for the future opening of an exploitation and its final closure and decommissioning. Since they contain all information related to the physical, biological, chemical and economic condition of the areas where industrial projects are proposed or planned, they present invaluable guidance for the planning and implementation of environmental mitigation as well as environmental restoration after the mine is closed. They further yield relevant data on the socio-economic impacts of a project. The present report provides guidance on the environmental impact assessment of uranium mining and milling projects, including in situ leach projects which will be useful for companies in the process of planning uranium developments as well as for the regional or national authorities who will assess such developments. Additional information and advice is given through environmental case histories from five different countries. Those case histories are not meant to be prescriptions for conducting assessments nor even firm recommendations, but should serve as examples for the type and extent of work involved in assessments. A model assessment and licensing process is recommended based on the experience of the five countries

  16. Environmental Project of I.E.S. Antoni Maura

    Science.gov (United States)

    Crespi Salom, Pere

    2010-05-01

    Environmental Project of I.E.S. Antoni Maura Author(s): Pere Crespí i Salom Teacher of Department of Biology and Geology and Environmental Coordinator (2009-2010) from I.E.S. Antoni Maura . Mallorca. Illes Balears. Spain Teachers participating in the project : Myriam Fuentes Milani, Olga Ballester Nebot, Antoni Salom Ruiz, Julio René Loayza Casanova, Puy Aguirre Rémirez, Yolanda Martínez Laserna, Jaume Puppo Lama, Carme Arrom , Dolors Aguiló Segura, Marga Ordinas Boter, Angel Fernàndez Albertí , Immaculada Suau López, Antònia Florit Torrandell, Isabel Mateu Arcos, Román Piña Valls i Pere Crespí Salom. Our institute takes part since 2004 in adapting environmentally the schools in the Balearics which consists of developing activities which aim is that both teachers and students acquire habits so as to apply to their ordinary lives though different participative commissions ( 10-15 teachers): 1st commission: recycling and reusing materials. Enough bins in the classrooms and floors: yellow for plastic, blue for paper, and green for the other. We tend to use recycled materials in different celebrations such as Carnival, Christmas, Saint Jordi and Environmental day. We also organise workshops for the teachers to develop afterwards with the students and nature of environmental exposures. 2nd commission: Scatter information ( MonMaura, Maurifull, Green window and website).Throughout different means we inform the teachers and students about all the school activities and where to consult.( www.iesantonimaura.net, Playful area , environmental project ). 3rd commission: Reusing text books.( there is a students service of borrowing books and giving them back at the end of the school year if the book is in good use.) 4th commission: Improving the school surroundings, the back garden and garden with native plants. Department of Biology and Geology is responsible for caring for an organic garden and in turn improve the center's garden with native plants within the

  17. Environmental Audit, Weldon Spring Site Remedial Action Project

    International Nuclear Information System (INIS)

    1991-06-01

    This report documents the results of the Environmental Baseline Audit of DOE's Weldon Spring Site Remedial Action Project (WSSRAP), located in St. Charles, Missouri. The purpose of the Environmental Baseline Audit is to provide the Secretary of Energy with concise information pertaining to the following issues: (1) compliance status with applicable environmental regulations (with the exception of National Environmental Policy Act [NEPA] requirements); (2) adherence to best management and accepted industry practices; (3) DOE vulnerabilities and liabilities associated with compliance status, environmental conditions, and management practices; (4) root causes of compliance findings (CF) and best management practice (BMP) findings; (5) adequacy of environmental management programs and organizations; and (6) noteworthy practices. This information will assist DOE in determining patterns and trends in environmental compliance, BMPs, and root causes, and will provide the information necessary for line management to take appropriate corrective actions. 6 figs., 11 tabs

  18. Environmental agreements in Canada : Aboriginal participation, EIA follow-up and environmental management of major projects

    Energy Technology Data Exchange (ETDEWEB)

    O' Faircheallaigh, C. [Griffith Univ., Brisbane (Australia). Dept. of Politics and Public Policy

    2006-05-15

    Attempts are now being made to address the historic marginalization of indigenous peoples from the management of resource projects located on their ancestral lands through the use of environmental agreements. However, the rapid pace of resource development in certain regions of Canada has meant that there is an increased need to ensure effective follow-up procedures for Environmental Impact Assessment (EIA) processes in order to achieve meaningful Aboriginal participation in the management of large-scale resource projects. Lack of effective follow-up has made it difficult for the relevant agencies to manage risks and uncertainties. This book discussed the use of new policy environmental agreements between industry, government, and Aboriginal peoples. Case studies where environmental agreements were used in the Northwest Territories, Alberta, and Newfoundland were presented in order to demonstrate their efficacy. It was concluded that structures and processes must be designed to encourage Aboriginal participation in consultation processes. refs., tabs.

  19. The Saskatchewan Environmental Assessment Act Guide to Proposal Development : oil and natural gas projects

    International Nuclear Information System (INIS)

    1999-02-01

    The manner in which requests for review of oil and natural gas projects are to be provided under the Environmental Assessment Act in Saskatchewan is described. The provisions of the Guide apply to all seismic projects on private or Crown lands, all drilling projects, flowline projects, access routes and production facilities on any land, except where the project is on cultivated land where it does not interfere with water bodies or endangered species. It also applies to any project that has the potential to meet the definition of 'development' under the Environmental Assessment Act. Basically, the following information is required for all proposals: (1) project description, (2) project evaluation, (3) description of proposed waste management practices, and (4) description of the proposed environmental monitoring. 4 refs

  20. Environmental Systems Research and Analysis FY 2000 Annual Report

    Energy Technology Data Exchange (ETDEWEB)

    David L. Miller; Castle, Peter Myer; Steven J. Piet

    2001-01-01

    The Environmental Systems Research (ESR) Program, a part of the Environmental Systems Research and Analysis (ESRA) Program, was implemented to enhance and augment the technical capabilities of the INEEL. Strengthening the Technical capabilities of the INEEL will provide the technical base to serve effectively as the Environmental Management Laboratory for the Office of Environmental Management (EM). This is a progress report for the third year of the ESR Program (FY 2000). A report of activities is presented for the five ESR research investment areas: (1) Transport Aspects of Selective Mass Transport Agents, (2) Chemistry of Environmental Surfaces, (3) Materials Dynamics, (4) Characterization Science, and (5) Computational Simulation of Mechanical and Chemical Systems. In addition to the five technical areas, the report describes activities in the Science and Technology Foundations element of the program, e.g., interfaces between ESR and the EM Science Program (EMSP) and the EM Focus Areas. The five research areas are subdivided into 18 research projects. FY 2000 research in these 18 projects has resulted in more than 50 technical papers that are in print, in press, in review, or in preparation. Additionally, more than 100 presentations were made at professional society meetings nationally and internationally. Work supported by this program was in part responsible for one of our researchers, Dr. Mason Harrup, receiving the Department of Energy’s “Bright Light” and “Energy at 23” awards. Significant accomplishments were achieved. Non-Destructive Assay hardware and software was deployed at the INEEL, enhancing the quality and efficiency of TRU waste characterization for shipment. The advanced tensiometer has been employed at numerous sites around the complex to determine hydrologic gradients in variably saturated vadose zones. An ion trap, secondary ion mass spectrometer (IT-SIMS) was designed and fabricated to deploy at the INEEL site to measure the

  1. Conceptual Model of Offshore Wind Environmental Risk Evaluation System

    Energy Technology Data Exchange (ETDEWEB)

    Anderson, Richard M.; Copping, Andrea E.; Van Cleve, Frances B.; Unwin, Stephen D.; Hamilton, Erin L.

    2010-06-01

    In this report we describe the development of the Environmental Risk Evaluation System (ERES), a risk-informed analytical process for estimating the environmental risks associated with the construction and operation of offshore wind energy generation projects. The development of ERES for offshore wind is closely allied to a concurrent process undertaken to examine environmental effects of marine and hydrokinetic (MHK) energy generation, although specific risk-relevant attributes will differ between the MHK and offshore wind domains. During FY10, a conceptual design of ERES for offshore wind will be developed. The offshore wind ERES mockup described in this report will provide a preview of the functionality of a fully developed risk evaluation system that will use risk assessment techniques to determine priority stressors on aquatic organisms and environments from specific technology aspects, identify key uncertainties underlying high-risk issues, compile a wide-range of data types in an innovative and flexible data organizing scheme, and inform planning and decision processes with a transparent and technically robust decision-support tool. A fully functional version of ERES for offshore wind will be developed in a subsequent phase of the project.

  2. Salt Lake City Area Integrated Projects: Rate adjustment: Environmental assessment

    International Nuclear Information System (INIS)

    1990-08-01

    The Department of Energy (DOE) has determined that the proposed firm power rate increase for the Salt Lake City Area Integrated Projects (Integrated Projects) power would not constitute a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act of 1969 (NEPA, 42 USC 4321, et seq.) and, as such, does not require the preparation of an environmental impact statement (EIS). This determination is based on an environmental assessment (EA) prepared by the Western Area Power Administration (Western) dated August 1990 (DOE/EA-0457). The EA identifies and evaluates the potential environmental and socioeconomic effects of the proposed action, and based on the analysis contained therein, DOE concludes that the impacts to the human environment resulting from the implementation of the rate increase would be insignificant

  3. Environmental Assessment Expanded Ponnequin Wind Energy Project Weld County, Colorado

    Energy Technology Data Exchange (ETDEWEB)

    N/A

    1999-03-02

    The U.S.Department of Energy (DOE) has considered a proposal from the State of Colorado, Office of Energy Conservation (OEC), for funding construction of the Expanded Ponnequin Wind Project in Weld County, Colorado. OEC plans to enter into a contracting arrangement with Public Service Company of Colorado (PSCO) for the completion of these activities. PSCo, along with its subcontractors and business partners, are jointly developing the Expanded Ponnequin Wind Project. DOE completed an environmental assessment of the original proposed project in August 1997. Since then, the geographic scope and the design of the project changed, necessitating additional review of the project under the National Environmental Policy Act. The project now calls for the possible construction of up to 48 wind turbines on State and private lands. PSCo and its partners have initiated construction of the project on private land in Weld County, Colorado. A substation, access road and some wind turbines have been installed. However, to date, DOE has not provided any funding for these activities. DOE, through its Commercialization Ventures Program, has solicited applications for financial assistance from state energy offices, in a teaming arrangement with private-sector organizations, for projects that will accelerate the commercialization of emerging renewable energy technologies. The Commercialization Ventures Program was established by the Renewable Energy and Energy Efficiency Technology Competitiveness Act of 1989 (P.L. 101-218) as amended by the Energy Policy Act of 1992 (P.L. 102-486). The Program seeks to assist entry into the marketplace of newly emerging renewable energy technologies, or of innovative applications of existing technologies. In short, an emerging renewable energy technology is one which has already proven viable but which has had little or no operational experience. The Program is managed by the Department of Energy, Office of Energy Efficiency and Renewable Energy. The

  4. Some environmental impacts associated with project Rio Blanco

    International Nuclear Information System (INIS)

    Alldredge, A.W.; Whicker, F.W.; Hanson, W.C.

    1976-01-01

    Project Rio Blanco, an experiment involving deep underground detonation of three 30-kiloton nuclear explosives designed to stimulate natural gas flow in geologic formations of low permeability, was conducted in western Colorado on 17 May 1973. Environmental impacts associated with this experiment were divided into three categories: radiation, ground motion, and conventional physical activities. The objective of observations made at Rio Blanco was to qualitatively and, where possible, quantitatively ascertain environmental impacts associated with the project. Observations indicated that ground motion and conventional activities appeared to cause the greatest impacts. Ground motion impacts were most severe within 2.4 km of the emplacement well (EW) and were predominantly associated with steep ravine and stream banks and rocky cliffs. Following the detonation, flow and turbidity had increased in a small stream adjacent to the EW. Animals receiving deleterious impacts were those associated with stream banks, cliffs and burrows. No mortality or injury was observed in any large animals. Based on overall results it appears important to give adequate attention to environmental effects resulting from nuclear fracturing experiments

  5. Environmental evaluation of Turkey's transboundary rivers' hydropower systems

    International Nuclear Information System (INIS)

    Berkun, M.

    2010-01-01

    The hydroelectric power and potential environmental impacts of hydroelectric projects in 2 transboundary rivers in Turkey were assessed. The southeastern Anatolia project (GAP) is expected to encompass 27 dams and 19 hydroelectric power plants. The large-scale project will increase domestic electricity production and help to provide irrigation for large agricultural schemes. The Coruh project will consist of 27 dams and hydroelectric power plants, which are expected to have serious environmental impacts in both upstream Turkey and downstream Georgia. A slowing down of each river's velocity will cause changes in sediment transport, while the storage of water in large reservoirs will alter water quality and cause changes in local micro-climates. Irrigation methods may cause soil erosion and salinization. The construction of 2 GAP dams on the Tigris and Euphrates rivers has caused protest from Syria and Iraq. Economic development in the regions caused by the proposed hydroelectric projects is expected to have significant environmental impacts on woodland and grassland areas. The projects are expected to adversely affect threatened plant, mammal, and fish species. More detailed cumulative impact and environmental impact assessments are needed to evaluate the economic, environmental, and social problems that are likely to arise as a result of the projects. 17 refs., 3 tabs., 6 figs.

  6. UMTRA Project environmental, health, and safety plan

    International Nuclear Information System (INIS)

    1989-02-01

    The basic health and safety requirements established in this plan are designed to provide guidelines to be applied at all Uranium Mill Tailings Remedial Action (UMTRA) Project sites. Specific restrictions are given where necessary. However, an attempt has been made to provide guidelines which are generic in nature, and will allow for evaluation of site-specific conditions. Health and safety personnel are expected to exercise professional judgment when interpreting these guidelines to ensure the health and safety of project personnel and the general population. This UMTRA Project Environmental, Health, and Safety (EH ampersand S) Plan specifies the basic Federal health and safety standards and special DOE requirements applicable to this program. In addition, responsibilities in carrying out this plan are delineated. Some guidance on program requirements and radiation control and monitoring is also included. An Environmental, Health, and Safety Plan shall be developed as part of the remedial action plan for each mill site and associated disposal site. Special conditions at the site which may present potential health hazards will be described, and special areas that should should be addressed by the Remedial Action Contractor (RAC) will be indicated. Site-specific EH ampersand S concerns will be addressed by special contract conditions in RAC subcontracts. 2 tabs

  7. Assessment of environmental projects in official schools in the locality 18 in Bogota

    International Nuclear Information System (INIS)

    Herrera R, Juan Francisco; Reyes S, Lucia; Amaya, Hector Oswaldo T .Gerena Oscar Arturo

    2006-01-01

    It was investigated the current state of de School Environment Projects in the public educational institutions of de Town 18 Rafael Uribe Uribe in Bogota (Colombia). The participation grade was measured in the design o execution and evaluation of the environmental projects, the registration and systematising of experiences, the generation of reflection spaces and the structuring to the Institutional Educational Project. By means of the test pilot the variables were determined for the sample design and the validation of the mensuration instrument. Three populations study object were determined and for each was designed a for through which the information of the variable was gathered by means of the method of direct interview. The results show that the overwhelming majority of the considered population didn't participated in the design in the execution of the environmental projects. The registration and systematizing of experiences are minimum, as well as the reflection spaces and conceptualization. There is not articulation from the environmental project to the Institutional Educational Project. The little participation, systematizing of experiences and lack of reflection spaces and conceptualization limit the impact of the School Environmental Projects in the formation of favorable attitudes to the environment

  8. Guidelines for the environmental impact statement for the proposed Great Whale River Hydroelectric Project

    International Nuclear Information System (INIS)

    1992-01-01

    The guidelines presented on the preparation of the environmental impact statement for the Great Whale hydroelectric project by Hydro-Quebec stipulated a project justification, description of the biophysical and social environments, a project description, and that the assessment must address project impacts, mitigative and compensatory measures, environmental surveillance, monitoring, and long-term management programs. Background information presented in this document provides technical notes on the guidelines and the environmental assessment process, a glossary of terms, and biographical notes. The technical notes address guideline structure, project justification, native knowledge, evaluation issues, cumulative impacts, and the assessment and review process

  9. Uranium mining environmental restoration project (PRAMU)

    International Nuclear Information System (INIS)

    Asenjo, A.

    2002-01-01

    The National Atomic Energy Commission (CNEA) started its activities 50 years ago and obtained significant results. At the present time, the CNEA is defined as an Institution of research and development in the nuclear field. It is also responsible for the management of radioactive wastes and the dismantling of nuclear and radioactive facilities. Mining and milling activities have been carried out during the past 40 years and at present the CNEA is undertaking the Uranium Mining Environmental Restoration Project (PRAMU). The aim of this project is to restore the environment as much as is possible in all places where uranium mining and milling activities were developed when taking into consideration both economic and technical reality. First, the characteristics of the problems in each site are determined through appropriate studies which identify the existing or potential impacts, the possible pathways of contamination, etc. The sites being studied are: MALARGUE (Mendoza Province), CORDOBA (Cordoba Province), LOS GIGANTES (Cordoba Province), HUEMUL (Mendoza Province), PICHINAN (Chubut Province), TONCO (Salta Province), LA ESTELA (San Luis Province), LOS COLORADOS (La Rioja Province). PRAMU seeks to improve the current conditions of the tailings deposits and mines and to ensure the long term protection of people and the environment. The CNEA is required to comply with all legislation that is in force and is under the control of various national, provincial and local State institutions. The main objectives of the project for the various sites are: (a) Malargue site: to implement the actions necessary for environmental restoration and management of the tailings derived from the uranium ores processed in the industrial plant; (b) Cordoba and Los Gigantes sites: to design, engineer and execute the activities required for closure of the sites; (c) Other sites (Huemul, Pichinan, Tonco, La Estela, Los Colorados): to develop an environmental evaluation and, on the basis of

  10. Housing projects in Trabzon: Marketting discourses and physical environmental features

    OpenAIRE

    AYDIN TÜRK, Yelda; KARADENİZ, Beyza

    2018-01-01

    Thehousing projects, that have turned into concept projects promoted as acommodity since last decade in Turkey. These projects, are marketed withdiscourses such as “the long-awaited life”, “ideal home” and are constructed onthe urban fringes. In this study, the housing projects that developed inTrabzon in recent years have been examined in this context. Marketing discourseand physical environmental characteristics of the projects have been analyzed.Thus, the study finds out to what extent the...

  11. Incorporating socio-environmental considerations into project assessment models using multi-criteria analysis: A case study of Sri Lankan hydropower projects

    International Nuclear Information System (INIS)

    Morimoto, Risako

    2013-01-01

    Before commissioning any energy projects, conducting robust assessments of different options in terms of their economic and socio-environmental impacts is important for successful project implementation. Yet, there is currently a lack of tools that simultaneously assess sustainability impacts; instead, they are often investigated separately, which gives decision makers somehow disintegrated information. Thus the main objective of this study is to examine how to incorporate socio-environmental considerations into project assessment models. The multi-criteria analysis is applied to the case study of Sri Lankan hydropower projects as an illustrative example. The estimated quantitative relationship between economic, environmental and social impacts of hydropower development is presented in this study. Such estimation, using sustainability indicators of hydropower projects, enables us to understand marginal trade-offs among economic, environmental and social objectives of hydropower development. Hence, this would provide an overview of potential impacts of different scenarios that are designed to be implemented and indicate an optimum mix of hydropower generation. - Highlights: • This study provides an effective hydropower project evaluation method using the MCA. • The proposed tool shows the quantitative relationship explicitly. • Marginal trade-offs between sustainability objectives are presented

  12. Hydroelectric project EA's [environmental assessments]: The Magpie development in northern Ontario

    International Nuclear Information System (INIS)

    Ashwood, K.

    1992-01-01

    Great Lakes Power recently constructed a hydroelectric plant on the Magpie River near Wawa, Ontario. The project involved three main elements: construction of a 33 m high dam, a 15.5 MW power station, and a spillway at Steephill Falls; construction of a 3.5 m high overflow weir just above the crest of scenic Magpie Falls, creating a head pond to supply a 15 MW power plant; and construction of a weir and 15 MW power plant at Mission Falls. Although this was a private development and therefore not automatically subject to Ontario's Environmental Assessment Act, Great Lakes Power decided to conform with the act's requirements and undertook a comprehensive environmental assessment (EA). Environmental issues were focused on changes in hydrology and water quality, impacts on fisheries and natural resources, slope stability and erosion, socioeconomic impacts, impacts on heritage resources, and impacts on tourism and recreation. The project was approved subject to conditions which included implementation of mitigation and monitoring requirements outlined in the EA document. Environmental specialists worked closely with the engineers at the detailed design stage of the project, resulting in modifications to the preliminary design to minimize environmental impacts

  13. Hellsgate Winter Range : Wildlife Mitigation Project. Final Environmental Assessment.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1995-03-01

    Bonneville Power Administration (BPA) proposes to fund the Hellsgate Winter Range Wildlife Mitigation Project (Project) in a cooperative effort with the Colville Confederated Tribes and the Bureau of Indian Affairs (BIA). The proposed action would allow the sponsors to secure property and conduct wildlife management activities within the boundaries of the Colville Indian Reservation. This Final Environmental Assessment (EA) examines the potential environmental effects of acquiring and managing property for wildlife and wildlife habitat within a large project area. This area consists of several separated land parcels, of which 2,000 hectares (4,943 acres) have been purchased by BPA and an additional 4,640 hectares (11,466 acres) have been identified by the Colville Confederated Tribes for inclusion in the Project. Four proposed activities (habitat protection, habitat enhancement, operation and maintenance, and monitoring and evaluation) are analyzed. The proposed action is intended to meet the need for mitigation of wildlife and wildlife habitat that was adversely affected by the construction of Grand Coulee and Chief Joseph Dams and their reservoirs.

  14. Hellsgate Winter Range: Wildlife mitigation project. Final environmental assessment

    International Nuclear Information System (INIS)

    1995-03-01

    Bonneville Power Administration (BPA) proposes to fund the Hellsgate Winter Range Wildlife Mitigation Project (Project) in a cooperative effort with the Colville Confederated Tribes and the Bureau of Indian Affairs (BIA). The proposed action would allow the sponsors to secure property and conduct wildlife management activities within the boundaries of the Colville Indian Reservation. This Final Environmental Assessment (EA) examines the potential environmental effects of acquiring and managing property for wildlife and wildlife habitat within a large project area. This area consists of several separated land parcels, of which 2,000 hectares (4,943 acres) have been purchased by BPA and an additional 4,640 hectares (11,466 acres) have been identified by the Colville Confederated Tribes for inclusion in the Project. Four proposed activities (habitat protection, habitat enhancement, operation and maintenance, and monitoring and evaluation) are analyzed. The proposed action is intended to meet the need for mitigation of wildlife and wildlife habitat that was adversely affected by the construction of Grand Coulee and Chief Joseph Dams and their reservoirs

  15. Fiscal 2000 feasibility research on environmentally friendly coal utilization system. Seminar holding project (China: Zaozhuang, Yanshan, Jianshan, Jinzhou); 2000 nendo kankyo chowagata sekitan riyo system kanosei chosa hokokusho. Seminar kaisai jigyo (Chugoku Zhaozhuang, Yanshan, Jianshan, Jinzhou)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    Seminars were held in China for the delivery of reports on the results of model projects with a view to popularizing the results of the clean coal technology model projects, which had been completed, for the purpose of contributing to the improvement on coal utilization technology and to the enhancement of environmental protection. The seminars took place at the sites of demonstration model projects just completed in China, namely, Zhejiang Huba Corporation (low-grade coal combustion system); Chaili Colliery, Zaozhuang Coal Mining Administration (CFBC - circulating fluidized bed combustion); Jinzhou Heat Power General Co., Ltd. (CFBC); and Beijing Yanshan Petrochemical Corporation (desulfurizing agent-added coal-water mixture system). At each of the project implementation sites, lectures were given on technical matters, technical know-how was exchanged, and study tours were organized to facilities concerned, which meant to promote the diffusion of the related technologies throughout China and, eventually, to contribute to the enhancement of environmental protection. The main subjects at the seminars included the introduction of GAP (green aid plan) projects in China, introduction of the outlines of technologies related to the model projects, verification and achievements, latest trends, and measures for the diffusion of the technologies. Study tours were made, and videos were shown relating to the local conditions. Every one of the seminars was successfully attended by 60-70 participants. (NEDO)

  16. Environmental monitoring for the DOE coolside and LIMB demonstration extension projects. Final report, May--August 1991

    Energy Technology Data Exchange (ETDEWEB)

    White, T.; Contos, L.; Adams, L. [Radian Corp., Research Triangle Park, NC (United States)

    1992-03-01

    The purpose of this document is to present environmental monitoring data collected during the US Department of Energy Limestone Injection Multistage Burner (DOE LIMB) Demonstration Project Extension at the Ohio Edison Edgewater Generating Station in Lorain, Ohio. The DOE project is an extension of the US Environmental Protection Agency`s (EPA`s) original LIMB Demonstration. The program is operated nuclear DOE`s Clean Coal Technology Program of ``emerging clean coal technologies`` under the categories of ``in boiler control of oxides of sulfur and nitrogen`` as well as ``post-combustion clean-up.`` The objective of the LIMB program is to demonstrate the sulfur dioxide (SO{sub 2}) and nitrogen oxide (NO{sub x}) emission reduction capabilities of the LIMB system. The LIMB system is a retrofit technology to be used for existing coal-fired boilers equipped with electrostatic precipitators (ESPs).

  17. Final Environmental Statement related to the operation of WPPSS Nuclear Project No. 3 (Docket No. 50-508)

    International Nuclear Information System (INIS)

    1985-05-01

    This Final Environmental Statement contains the second assessment of the environmental impact associated with the Washington Public Power System Nuclear Project No. 3 (WNP-3) pursuant to the National Environmental Policy Act of 1969 (NEPA) and Title 10 of the Code of Federal Regulations, Part 51, as amended, of the Nuclear Regulatory Commission regulations. This statement examines the environment, environmental consequences and mitigating actions, and environmental benefits and costs. Land use and terrestrial and aquatic resource impacts will be small. Operational impacts to historic and archeological sites will be negligible. The effects of routine operations, energy transmission and periodic maintenance of rights-of-way and transmission facilities should not jeopardize any populations of endangered or threatened species. No significant impacts are anticipated from normal operational releases of radioactivity. The risk of radiation exposure associated with accidental release of radioactivity is very low. The net socioeconomic effects of the project will be beneficial

  18. Proposed OPEG Namakan River hydro development project draft environmental report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2010-07-01

    The Ojibway Power and Energy Group (OPEG) is planning on installing a hydroelectric generating facility along the Namakan River at High Falls in Canada. In order the meet the different requirements in terms of environmental assessment for such a project, the group prepared an environmental report. The aim of this paper is to present the comments of the Quetico Foundation, a charity whose aim is to protect wilderness class parks. The foundation found both general and discipline-by-discipline deficiencies in OPEG's environmental report. All the deficiencies the Foundation observed are listed in this report, general deficiencies, and specific deficiencies concerning fisheries, terrestrial ecology, hydrology and socio-economic impacts. The Quetico Foundation demonstrated that a significant number of deficiencies are found in the OPEG environmental report, suggesting that they did not fully understand the potential long term impacts of their project and that further study should be undertaken.

  19. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2011

    Energy Technology Data Exchange (ETDEWEB)

    none,

    2012-09-27

    The West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2011. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2011. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2011 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  20. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2012

    Energy Technology Data Exchange (ETDEWEB)

    Rendall, John D. [CH2M HILL • B& amp; W West Valley, LLC (CHBWV); Steiner, Alison F. [URS Professional Solutions (URSPS); Klenk, David P. [CH2M HILL • B& amp; W West Valley, LLC (CHBWV)

    2013-09-19

    The West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2012. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2012. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2012 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  1. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2010

    International Nuclear Information System (INIS)

    2011-01-01

    The West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2010. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2010. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE's effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations and directives, evaluation of data collected in 2010 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  2. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2013

    Energy Technology Data Exchange (ETDEWEB)

    Rendall, John D. [CH2MHILL • B& W West Valley, LLC (CHBWV); Steiner, Alison F. [CH2MHILL • B& W West Valley, LLC (CHBWV); Pendl, Michael P. [CH2MHILL • B& W West Valley, LLC (CHBWV)

    2014-09-16

    West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2013. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2013. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2013 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  3. Environmental management of uranium mining projects in Australia - a national perspective

    International Nuclear Information System (INIS)

    Usback, R.

    1987-01-01

    The environmental management of uranium mining projects in Australia is described. The paper reveals that the environmental examination of uranium mining proposals, and the establishment of environmental protection measures for such proposals, have been integrated with other requirements to meet the needs of local communities. (U.K.)

  4. Discussion on the method of environmental radiological impact assessment for the highway construction project

    International Nuclear Information System (INIS)

    Qiu Guohua

    2008-01-01

    Based on the characteristics and environmental radiological impact of the highway construction project, the basic procedure of environmental radiological impact assessment for the highway construction project is put forward, including analysis and determination of contamination sources, selection of evaluation factors, determination of assessment range and dose limit, environmental investigation, environmental impact prediction and assessment. The working method of each procedure is analyzed. (authors)

  5. Environmental measures for Escuintla No. 3 unit thermal power project

    Energy Technology Data Exchange (ETDEWEB)

    Quisquinay, Carlos; Fabian Rosales, Alejandro [Instituto Nacional de Electrificacion, (Guatemala)

    1997-12-31

    The environmental measures in relation to the project implementation was studied with reference to the Japanese Standards and incorporated in the Implementation Program. This report is prepared however, to review the environmental measures for the project in more detail as to the allowable standards and regulations concerning the measures for the environmental pollution. The authors present the environmental conditions around the Escuintla Power Station in Guatemala; the measures for environmental pollution and evaluation; the measures for prevention of air pollution and diffusion calculations (estimation and assessment of environmental impacts) [Espanol] Las medidas ambientales con relacion a la consolidacion del proyecto, se estudiaron con referencia a los Estandares Japoneses e incorporados en el Programa de Consolidacion. Sin embargo, este reporte ha sido preparado para revisar las medidas ambientales para el proyecto mas detalladamente, con relacion a los estandares y reglamentaciones admisibles concernientes a las medidas de contaminacion ambiental. Los autores presentan las condiciones ambientales en los alrededores de la Central Termoelectrica de Escuintla de Guatemala; las medidas para la prevencion de la contaminacion del aire y los calculos de difusion (estimacion y evaluacion del impacto ambiental)

  6. Environmental measures for Escuintla No. 3 unit thermal power project

    Energy Technology Data Exchange (ETDEWEB)

    Quisquinay, Carlos; Fabian Rosales, Alejandro [Instituto Nacional de Electrificacion, (Guatemala)

    1996-12-31

    The environmental measures in relation to the project implementation was studied with reference to the Japanese Standards and incorporated in the Implementation Program. This report is prepared however, to review the environmental measures for the project in more detail as to the allowable standards and regulations concerning the measures for the environmental pollution. The authors present the environmental conditions around the Escuintla Power Station in Guatemala; the measures for environmental pollution and evaluation; the measures for prevention of air pollution and diffusion calculations (estimation and assessment of environmental impacts) [Espanol] Las medidas ambientales con relacion a la consolidacion del proyecto, se estudiaron con referencia a los Estandares Japoneses e incorporados en el Programa de Consolidacion. Sin embargo, este reporte ha sido preparado para revisar las medidas ambientales para el proyecto mas detalladamente, con relacion a los estandares y reglamentaciones admisibles concernientes a las medidas de contaminacion ambiental. Los autores presentan las condiciones ambientales en los alrededores de la Central Termoelectrica de Escuintla de Guatemala; las medidas para la prevencion de la contaminacion del aire y los calculos de difusion (estimacion y evaluacion del impacto ambiental)

  7. Impacts and environmental administration in development projects: instruments for the political fixation

    International Nuclear Information System (INIS)

    Angel Sanint, Enrique

    1999-01-01

    Inside the scheme of the necessary environmental administration to evaluate, to mitigate, to correct and to compensate the environmental impacts of a development project the acting diagram is presented, belonging to the multi-objective analysis, like an interesting tool that contributes to consider restrictions and to keep in mind the economic aspect inside the process of politics fixation for the interaction between the environmental authority and the developers of projects in the three basic instances contemplated by the legislation like interaction points

  8. Environmental Information System Baden-Wuerttemberg, RIPS 2016. Spatial information and planning system

    International Nuclear Information System (INIS)

    Weissenbach, Kurt; Czommer, Olaf; Ellmenreich, Bastian

    2016-01-01

    The Spatial Information and Planning System (RIPS), as the overarching component of the Environmental Information System Baden-Wuerttemberg (UIS BW), implements the environmental and nature conservation-specific geoinformation-related requirements taking into account applicable framework conditions. To this end, RIPS offers tailor-made services on the basis of a standardized and in transnational cooperation developed technical kit for the areas of geodata processing and management as well as the development and provision of software components with geo-functions and geodata services as part of the technical and information procedures. The coordination and steering takes place via project development offices, working groups and committees in close coordination with the departments of environmental and nature conservation administration as well as further cooperation and in coordination with other specialist administrations. Taking into account changed framework conditions and new geo-referenced requirements in UIS BW, the present RIPS concept focuses on future-oriented geofunction and geodata management in the field of environmental and nature conservation management as well as the provision of geo-specialized environmental and nature conservation data for policy makers, administrators and the public on innovative technologies Applications and Services. [de

  9. Environmental Mycobiome Modifiers of Inflammation and Fibrosis in Systemic Sclerosis

    Science.gov (United States)

    2016-09-01

    autoimmune systemic sclerosis and cancer: disease stratification, co-expression networks and genetic polymorphisms” Cancer Mechanisms Program, Norris ...NOTES 14. ABSTRACT This project is focused on Systemic Sclerosis (SSc), a progressive fibrotic disease characterized by skin fibrosis and damage to...quantitative manner. Our studies suggest that disease pathogenesis includes a common environmental fungal trigger, Rhodotorula glutinis, which we

  10. Geothermal environmental projects publication list with abstracts 1975-1978

    Energy Technology Data Exchange (ETDEWEB)

    Ricker, Y.E.; Anspaugh, L.R.

    1979-05-15

    This report contains 119 abstracts of publication resulting from or closely related to geothermal environmental projects conducted by the Environmental Sciences Division at Lawrence Livermore Laboratory. Publications are listed chronologically from 1975 through 1978. The main entries are numbered sequentially, and include the full citation, an abstract, and selected keywords. This section is followed by an author index, and a keyword index.

  11. Final report for SNL/NM environmental drilling project

    International Nuclear Information System (INIS)

    Wemple, R.P.; Meyer, R.D.; Staller, G.E.; Layne, R.R.

    1994-11-01

    Concern for the environment and cost reduction are driving forces for a broad effort in government and the private sector to develop new, more cost-effective technologies for characterizing, monitoring and remediating environmental sites. Secondary goals of the characterization, monitoring and remediation (CMR) activity are: minimize secondary waste generation, minimize site impact, protect water tables, and develop methods/strategies to apply new technologies. The Sandia National Laboratories (SNL) project in directional boring for CMR of waste sites with enhanced machinery from the underground utility installation industry was initiated in 1990. The project has tested a variety of prototype machinery and hardware built by the industrial partner, Charles Machine Works (CMW), and SNL at several sites (Savannah River Site (SRS), Hanford, SNL, Kirtland AFB (KAFB), CMW), successfully installed usable horizontal environmental test wells at SRS and SNL/KAFB, and functioned as a clearing house for information regarding application of existing commercial machinery to a variety of governmental and commercial sites. The project has continued to test and develop machinery in FY 94. The original goal of cost-effectiveness is being met through innovation, adaptation, and application of fundamental concepts. Secondary goals are being met via a basic philosophy of open-quotes cut/thrust and compact cuttings without adding large quantities of fluidclose quotes to an environmental problem site. This technology will be very cost-effective where applicable. Technology transfer and commercialization by CMW is ongoing and will continue into FY 95. Technology transfer to the private sector is ongoing and reflected in increasing machinery sales to environmental contractors. Education of regulatory agencies resulting in restructuring of appropriate regulatory standards for specification of the horizontal drilling techniques continues to be a long-range goal

  12. Final report for SNL/NM environmental drilling project

    Energy Technology Data Exchange (ETDEWEB)

    Wemple, R.P.; Meyer, R.D.; Staller, G.E. [Sandia National Labs., Albuquerque, NM (United States); Layne, R.R. [Charles Machine Works, Inc., Perry, OK (United States)

    1994-11-01

    Concern for the environment and cost reduction are driving forces for a broad effort in government and the private sector to develop new, more cost-effective technologies for characterizing, monitoring and remediating environmental sites. Secondary goals of the characterization, monitoring and remediation (CMR) activity are: minimize secondary waste generation, minimize site impact, protect water tables, and develop methods/strategies to apply new technologies. The Sandia National Laboratories (SNL) project in directional boring for CMR of waste sites with enhanced machinery from the underground utility installation industry was initiated in 1990. The project has tested a variety of prototype machinery and hardware built by the industrial partner, Charles Machine Works (CMW), and SNL at several sites (Savannah River Site (SRS), Hanford, SNL, Kirtland AFB (KAFB), CMW), successfully installed usable horizontal environmental test wells at SRS and SNL/KAFB, and functioned as a clearing house for information regarding application of existing commercial machinery to a variety of governmental and commercial sites. The project has continued to test and develop machinery in FY 94. The original goal of cost-effectiveness is being met through innovation, adaptation, and application of fundamental concepts. Secondary goals are being met via a basic philosophy of {open_quotes}cut/thrust and compact cuttings without adding large quantities of fluid{close_quotes} to an environmental problem site. This technology will be very cost-effective where applicable. Technology transfer and commercialization by CMW is ongoing and will continue into FY 95. Technology transfer to the private sector is ongoing and reflected in increasing machinery sales to environmental contractors. Education of regulatory agencies resulting in restructuring of appropriate regulatory standards for specification of the horizontal drilling techniques continues to be a long-range goal.

  13. Environmental impact management during construction of the limestone project

    International Nuclear Information System (INIS)

    Windsor, D.C.

    1988-01-01

    The Limestone Generating Station is being constructed on the Nelson River in Northern Manitoba, and will consist of a 10 unit powerhouse, 5 gate concrete spillway and earthfill dam spanning the 1.5 km width of the Nelson River. Environmental concerns associated with the project included insufficient pre- and post-construction monitoring documenting resources present or magnitude of impacts, impacts on brook trout and lake sturgeon resources, wildlife habitat loss due to construction activities, destruction or disturbance of historic or archaeological sites, degradation of nearby water courses and fish habitat by aggregate removal, in-migration of construction personnel, and various other socio-economic impacts. An overview is provided of monitoring activities and results in the above areas, which involved numerous consultants and government agencies. The project administration and workers did not find the environmental programs, including inspection and enforcement activities, to be onerous or an impediment to the project. On the contrary, the environmental requirements assisted in the general planning for certain activities, and in the general criteria for the conduct of the activities. The work permit process was particularly useful as it defined the requirements of both parties and provided the specific standards necessary determining the acceptability of the activities. 14 refs., 1 fig

  14. Environmental impacts associated with Project Rio Blanco

    International Nuclear Information System (INIS)

    Alldredge, A.W.; Whicker, F.W.; Hanson, W.C.

    Project Rio Blanco, an experiment involving deep underground detonation of three 30-kton nuclear explosives designed to stimulate natural gas flow in geologic formations of low permeability, was conducted in western Colorado on 17 May 1973. Environmental impacts associated with this experiment were divided into three categories: radiation, ground motion, and conventional physical activities. Radiation and ground motion are unique to this type experiment while conventional activities would be associated with any type of resource development. The objective of observations made at Rio Blanco was to qualitatively and, where possible, quantitatively ascertain environmental impacts associated with the project. Observations indicated that ground motion and conventional activities appeared to cause the greatest impacts. Ground motion impacts were most severe within 2.4 km of the emplacement well (EW) and were predominantly associated with steep ravine and stream banks and rocky cliffs. Following the detonation, flow and turbidity had increased in a small stream adjacent to the EW. Animals receiving deleterious impacts were those associated with stream banks, cliffs and burrows. No mortality or injury was observed in any large animals. (U.S.)

  15. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2009

    Energy Technology Data Exchange (ETDEWEB)

    West Valley Environmental Services LLC (WVES) and URS Corporation

    2010-09-17

    The West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2009. The report, prepared by the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2009. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program by the DOE ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental regulations and directives, evaluation of data collected in 2009 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  16. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2010

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2011-09-28

    The West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2010. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2010. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE's effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations and directives, evaluation of data collected in 2010 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  17. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2009

    International Nuclear Information System (INIS)

    2010-01-01

    The West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2009. The report, prepared by the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2009. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE's effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program by the DOE ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental regulations and directives, evaluation of data collected in 2009 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  18. IMPREMAS Project, Pilo project for the integration between Environmental Management System and safety Management System; Il Progetto IMPREMAS, Progetto pilota per l'eco-gestion delle Piccole e Medie Imprese classificate a rischio per l'uso e lo stoccaggio di sostanze pericolose previste dal DPR 17.5.1988 n. 175

    Energy Technology Data Exchange (ETDEWEB)

    Luciani, R.; Andriola, L.; Brunetti, N.; Caropreso, G. [ENEA, Centro Ricerche Casaccia, Rome (Italy). Dipt. Ambiente

    1999-07-01

    The topic discussed in this report can be inserted within the context of case studies carried out by ENEA in the promotion of Environmental Management Systems (EMAS-ISO14000). During the IMPREMAS project ENEA has therefore set up a method of integration between Environmental Management System and Safety Management System. [Italian] L'argomento trattato nel presente lavoro si inserisce nel contesto degli studi effettuati dall'ENEA nella promozione dei Sistemi di Gestione Ambientale (EMAS-ISO14000). ENEA durante il progetto IMPREMAS ha sviluppato un metodo per l'integrazione dei Sistemi di Gestione Ambientale con i Sistemi di Gestione della Sicurezza.

  19. Rebaselining of the plutonium residue elimination project at Rocky Flats Environmental Technology Site

    International Nuclear Information System (INIS)

    Sailor, W.C.; Catlett, D.S.; Burns, T.P.

    1997-01-01

    Systems Engineering and Value Engineering principles were put into practice in rebaselining the Pu Residue Stabilization and Elimination Project at the Rocky Flats Environmental Technology Site. Tradeoff studies were conducted as to how to best rebaseline the system under the new Safeguards Termination Limits (STSs) issued by the Department of Energy. Through the use of a computerized database, the means by which Stakeholder values and other high-level requirements have been included in the tradeoff studies were documented. 13 refs., 2 figs., 1 tab

  20. Rebaselining of the plutonium residue elimination project at Rocky Flats Environmental Technology Site

    Energy Technology Data Exchange (ETDEWEB)

    Sailor, W.C.; Catlett, D.S.; Burns, T.P. [and others

    1997-03-01

    Systems Engineering and Value Engineering principles were put into practice in rebaselining the Pu Residue Stabilization and Elimination Project at the Rocky Flats Environmental Technology Site. Tradeoff studies were conducted as to how to best rebaseline the system under the new Safeguards Termination Limits (STSs) issued by the Department of Energy. Through the use of a computerized database, the means by which Stakeholder values and other high-level requirements have been included in the tradeoff studies were documented. 13 refs., 2 figs., 1 tab.

  1. An innovative approach to multimedia waste reduction: Measuring performance for environmental cleanup projects

    International Nuclear Information System (INIS)

    Phifer, B.E. Jr.; George, S.M.

    1993-04-01

    One of the greatest challenges we now face in environmental cleanup is measuring the progress of minimizing multimedia transfer releases and achieving waste reduction. Briefly, multimedia transfer refers to the air, land, and water where pollution is not controlled, concentrated, and moved from one medium to another. An example of multimedia transfer would be heavy metals in wastewater sludges moved from water to land disposal. Over $2 billion has been budgeted for environmental restoration site cleanups by the Department of Energy (DOE) for FY 1994. Unless we reduce the huge waste volumes projected to be generated in the near future, then we will devote more and more resources to the management and disposal of these wastes. To meet this challenge, the Martin Marietta Energy Systems, Inc., Oak Ridge Environmental Restoration (ER) Program has explored the value of a multimedia approach by designing an innovative Pollution Prevention Life-Cycle Model. The model consists of several fundamental elements (Fig. 1) and addresses the two major objectives of data gathering and establishing performance measures. Because the majority of projects are in the remedial investigation phase, the focus is on the prevention of unnecessary generation of investigation-derived waste and multimedia transfers at the source. A state-of-the-art tool developed to support the life-cycle model for meeting these objectives is the Numerical Scoring System (NSS), which is a computerized, user-friendly data base system for information management, designed to measure the effectiveness of pollution prevention activities in each phase of the ER Program. This report contains a discussion of the development of the Pollution Prevention Life-Cycle Model and the role the NSS will play in the pollution prevention programs in the remedial investigation phase of the ER Program at facilities managed by Energy Systems for DOE

  2. Project Management Approach to Transition of the Miamisburg Closure Project From Environmental Cleanup to Post-Closure Operations

    International Nuclear Information System (INIS)

    Carpenter, C.P.; Marks, M.L.; Smiley, S.L.; Gallaher, D.M.; Williams, K.D.

    2006-01-01

    The U.S. Department of Energy (DOE) used a project management approach to transition the Miamisburg Closure Project from cleanup by the Office of Environmental Management (EM) to post-closure operations by the Office of Legacy Management (LM). Two primary DOE orders were used to guide the site transition: DOE Order 430.1B, Real Property Asset Management, for assessment and disposition of real property assets and DOE Order 413.3, Program and Project Management for Acquisition of Capital Assets, for project closeout of environmental cleanup activities and project transition of post-closure activities. To effectively manage these multiple policy requirements, DOE chose to manage the Miamisburg Closure Project as a project under a cross-member transitional team using representatives from four principal organizations: DOE-LM, the LM contractor S.M. Stoller Corporation, DOE-EM, and the EM contractor CH2M Hill Mound Inc. The mission of LM is to manage the Department's post-transition responsibilities and long-term care of legacy liabilities and to ensure the future protection of human health and the environment for cleanup sites after the EM has completed its cleanup activities. (authors)

  3. Fiscal 1995 survey report on the environmentally friendly type coal utilization system joint demonstration project. Water-saving coal preparation system joint demonstration project; Kankyo chowagata sekitan riyo system kyodo jissho jigyo. Shosuigata sentan system kyodo jissho jigyo

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-03-01

    This project makes demonstration of clean coal technology (CCT) in China and preparation for the base of its spread, controlled environmental pollution due to the coal use by the countries concerned, and contributes to stably secure energy of Japan. The paper made analog operation in the 1960s-1970s, supported by Russia and Poland, introduced two computer systems for operational control and quality control, densimeter, level meter, flow meter and analyzer to coal preparation plants having problems on productivity and quality control, made the optimum operational diagnosis for the plants, and at the same time, demonstrated the comprehensive rehabilitation type system by which water saving, high quality and high effectiveness are obtained. Various types of sensors such as rapid ash meter, scale and densitometer and computers are introduced to coal preparation plants which were recently constructed in China, have jig or heavy liquid cyclone as main preparation equipment and conducts operational control. There, the central control system was demonstrated in which various information collected in the central operation room and in-site equipment is combined by network for high-grade data processing and water saving is achieved. 50 figs., 11 tabs.

  4. Environmental impacts of dispersed development from federal infrastructure projects.

    Science.gov (United States)

    Southerland, Mark T

    2004-06-01

    Dispersed development, also referred to as urban growth or sprawl, is a pattern of low-density development spread over previously rural landscapes. Such growth can result in adverse impacts to air quality, water quality, human health, aquatic and terrestrial ecosystems, agricultural land, military training areas, water supply and wastewater treatment, recreational resources, viewscapes, and cultural resources. The U.S. Environmental Protection Agency (U.S. EPA) is charged with protecting public health and the environment, which includes consideration of impacts from dispersed development. Specifically, because federal infrastructure projects can affect the progress of dispersed development, the secondary impacts resulting from it must be assessed in documents prepared under the National Environmental Policy Act (NEPA). The Council on Environmental Quality (CEQ) has oversight for NEPA and Section 309 of the Clean Air Act requires that U.S. EPA review and comment on federal agency NEPA documents. The adverse effects of dispersed development can be induced by federal infrastructure projects including transportation, built infrastructure, modifications in natural infrastructure, public land conversion and redevelopment of properties, construction of federal facilities, and large traffic or major growth generation developments requiring federal permits. This paper presents an approach that U.S. EPA reviewers and NEPA practitioners can use to provide accurate, realistic, and consistent analysis of secondary impacts of dispersed development resulting from federal infrastructure projects. It also presents 24 measures that can be used to mitigate adverse impacts from dispersed development by modifying project location and design, participating in preservation or restoration activities, or informing and supporting local communities in planning.

  5. The impacts of the 1995 financial institution environmental guidelines on power projects

    International Nuclear Information System (INIS)

    Weaver, K.L.; Schott, G.A.

    1996-01-01

    In 1995, two of the most influential international financial institutions, The World Bank and The US Export-Import Bank (Ex-Im Bank) issued new environmental guidelines. These guidelines, particularly the World Bank guidelines, are used as a benchmark for evaluating the environmental acceptability of a project by many financial institutions, project developers, private investors, the public, and many developing countries. The impact of these guidelines must be well understood by developers of power projects in order to obtain the necessary financing, in addition to attracting investors, and obtaining national approvals and general public acceptance

  6. Cincinnati, Ohio: Two environmental projects in danger of being misunderstood

    International Nuclear Information System (INIS)

    DeJong, K.A.

    1992-01-01

    The Mill Creek Flood Control and the Fernald Decontamination projects are major environmental issues in the (sub)urban setting of Cincinnati. Flood control of the Mill Creek, a tributary of the Ohio River that bisects Cincinnati, was initiated after a flood with $3 million damage in 1959. Its costs were originally estimated at $42 million (1970) and later at $106 million (1976); $110 million has now been spent and the total cost may reach $313 million in the year 2000 (1992 dollars). Benefit/cost ratios ranging between 2.6:1 and 1.6:1 were used to rationalize this project. Flood frequency of the Mill Creek will be discussed. Decontamination of the suburban Fernald site follows manufacturing of nuclear materials from 1953 until 1989. 149 tons of uranium and thorium wastes were released in the air, 83.5 tons to the Greater Miami River and 5,975 tons were placed in pits, all of which are leaking. The cost to cleanup up the local contamination may exceed $10 billion over a time period of 20--30 years, and the calculation of benefit/cost ratios is complex. The hydrology of the Fernald site will be examined. These two environmental projects are run respectively by the Army Corps of Engineers and the US Department of Energy through large industrial contractors. The projects are in danger of becoming like projects of the ''Military-Industrial Complex'' because of the public's ignorance or misinterpretation of the facts; the argument of public safety, and the huge costs. The role of geologists should include edification of the public about the geological aspects of environmental projects

  7. West Valley Demonstration Project site environmental report for calendar year 1996

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-06-01

    The West Valley Demonstration Project (WVDP), the site of a US Department of Energy environmental cleanup activity operated by West Valley Nuclear Services Co., Inc., (WVNS), is in the process of solidifying liquid high-level radioactive waste remaining at the site after commercial nuclear fuel reprocessing was discontinued. The Project is located in Western New York State, about 30 miles south of Buffalo, within the New York State-owned Western New York Nuclear Service Center (WNYNSC). This report represents a single, comprehensive source of off-site and on-site environmental monitoring data collected during 1996 by environmental monitoring personnel. The environmental monitoring program and results are discussed in the body of this report. The monitoring data are presented in the appendices. Appendix A is a summary of the site environmental monitoring schedule. Appendix B lists the environmental permits and regulations pertaining to the WVDP. Appendices C through F contain summaries of data obtained during 1996 and are intended for those interested in more detail than is provided in the main body of the report.

  8. Cost-effectiveness of environmental management for vector control in resource development projects.

    Science.gov (United States)

    Bos, R

    1991-01-01

    Vector control methods are traditionally divided in chemical, biological and environmental management approaches, and this distinction also reflected in certain financial and economic aspects. This is particularly true for environmental modification, usually engineering or other structural works. It is highly capital intensive, as opposed to chemical and biological control which require recurrent expenditures, and discount rates are therefore a prominent consideration in deciding for one or the other approach. Environmental manipulation requires recurrent action, but can often be carried out with the community participation, which raises the issue of opportunity costs. The incorporation of environmental management in resource projects is generally impeded by economic considerations. The Internal Rate of Return continues to be a crucial criterion for funding agencies and development banks to support new projects; at the same time Governments of debt-riden countries in the Third World will do their best to avoid additional loans on such frills as environmental and health safeguards. Two approaches can be recommended to nevertheless ensure the incorporation of environmental management measures in resource projects in an affordable way. First, there are several examples of cases where environmental management measures either have a dual benefit (increasing both agricultural production and reducing vector-borne disease transmission) or can be implemented at zero costs. Second, the additional costs involved in structural modifications can be separated from the project development costs considered in the calculations of the Internal Rate of Return, and financial support can be sought from bilateral technical cooperation agencies particularly interested in environmental and health issues. There is a dearth of information in the cost-effectiveness of alternative vector control strategies in the developing country context. The process of integrating vector control in the

  9. Preoperational Environmental Survey for the Spent Nuclear Fuel (SNF) Project Facilities

    International Nuclear Information System (INIS)

    MITCHELL, R.M.

    2000-01-01

    This document represents the report for environmental sampling of soil, vegetation, litter, cryptograms, and small mammals at the Spent Nuclear Fuel Project facilities located in 100 K and 200 East Areas in support of the preoperational environmental survey

  10. Preoperational Environmental Survey for the Spent Nuclear Fuel (SNF) Project Facilities

    Energy Technology Data Exchange (ETDEWEB)

    MITCHELL, R.M.

    2000-10-12

    This document represents the report for environmental sampling of soil, vegetation, litter, cryptograms, and small mammals at the Spent Nuclear Fuel Project facilities located in 100 K and 200 East Areas in support of the preoperational environmental survey.

  11. Preoperational Environmental Survey for the Spent Nuclear Fuel (SNF) Project Facilities

    Energy Technology Data Exchange (ETDEWEB)

    MITCHELL, R.M.

    2000-09-28

    This document represents the report for environmental sampling of soil, vegetation, litter, cryptograms, and small mammals at the Spent Nuclear Fuel Project facilities located in 100 K and 200 East Areas in support of the preoperational environmental survey.

  12. Bangladesh Agro-Climatic Environmental Monitoring Project

    Science.gov (United States)

    Vermillion, C.; Maurer, H.; Williams, M.; Kamowski, J.; Moore, T.; Maksimovich, W.; Obler, H.; Gilbert, E.

    1988-01-01

    The Agro-Climatic Environmental Monitoring Project (ACEMP) is based on a Participating Agency Service Agreement (PASA) between the Agency for International Development (AID) and the National Oceanic and Atmospheric Administration (NOAA). In FY80, the Asia Bureau and Office of Federal Disaster Assistance (OFDA), worked closely to develop a funding mechanism which would meet Bangladesh's needs both for flood and cyclone warning capability and for application of remote sensing data to development problems. In FY90, OFDA provided for a High Resolution Picture Transmission (HRPT) receiving capability to improve their forecasting accuracy for cyclones, flooding and storm surges. That equipment is primarily intended as a disaster prediction and preparedness measure. The ACEM Project was designed to focus on the development applications of remote sensing technology. Through this Project, AID provided to the Bangladesh Government (BDG) the equipment, technical assistance, and training necessary to collect and employ remote sensing data made available by satellites as well as hydrological data obtained from data collection platforms placed in major rivers. The data collected will enable the BDG to improve the management of its natural resources.

  13. Integrating Project-Based Service-Learning into an Advanced Environmental Chemistry Course

    Science.gov (United States)

    Draper, Alison J.

    2004-01-01

    An active service-learning research work is conducted in the field of advanced environmental chemistry. Multiple projects are assigned to students, which promote individual learning skills, self-confidence as scientists, and a deep understanding of the environmental chemist's profession.

  14. C.2 analysis of the environmental effects of the Nuclear Facilities Modernization project

    International Nuclear Information System (INIS)

    1991-04-01

    This analysis indicates that the potential impacts associated with the current/projected Mound tritium operations are adequately bounded by the existing environmental impacts analyzed in the FEIS. It also indicates that the incremental impacts of the NFM project will make a positive contribution to the overall impact of current/projected tritium operations. Except for minor and normal temporary conditions during the construction and demolition phases, the NFM project would measurably reduce the likelihood of adverse consequences to the environment. Relocation of the PE/PD laboratory operations from the SW/R Tritium Complex to the T Building will place these operations in a safer, state-of-the-art glovebox systems. Through the utilization of modern laboratory equipment and enhanced containment, the project will reduce the quantity of routine airborne tritium releases and volume of solid tritiated wastes resulting from routine PE/PD laboratory operations. The increased reliance placed on engineered safety aspects and stronger mitigative measures by the project will also reduce the risk associated with these operations by reducing both the probability and consequences of unusual occurrences involving uncontrolled tritium releases

  15. Framework for Identifying Key Environmental Concerns in Marine Renewable Energy Projects- Appendices

    Energy Technology Data Exchange (ETDEWEB)

    Kramer, Sharon; Previsic, Mirko; Nelson, Peter; Woo, Sheri

    2010-06-17

    Marine wave and tidal energy technology could interact with marine resources in ways that are not well understood. As wave and tidal energy conversion projects are planned, tested, and deployed, a wide range of stakeholders will be engaged; these include developers, state and federal regulatory agencies, environmental groups, tribal governments, recreational and commercial fishermen, and local communities. Identifying stakeholders’ environmental concerns in the early stages of the industry’s development will help developers address and minimize potential environmental effects. Identifying important concerns will also assist with streamlining siting and associated permitting processes, which are considered key hurdles by the industry in the U.S. today. In September 2008, RE Vision consulting, LLC was selected by the Department of Energy (DoE) to conduct a scenario-based evaluation of emerging hydrokinetic technologies. The purpose of this evaluation is to identify and characterize environmental impacts that are likely to occur, demonstrate a process for analyzing these impacts, identify the “key” environmental concerns for each scenario, identify areas of uncertainty, and describe studies that could address that uncertainty. This process is intended to provide an objective and transparent tool to assist in decision-making for siting and selection of technology for wave and tidal energy development. RE Vision worked with H. T. Harvey & Associates, to develop a framework for identifying key environmental concerns with marine renewable technology. This report describes the results of this study. This framework was applied to varying wave and tidal power conversion technologies, scales, and locations. The following wave and tidal energy scenarios were considered: 4 wave energy generation technologies 3 tidal energy generation technologies 3 sites: Humboldt coast, California (wave); Makapu’u Point, Oahu, Hawaii (wave); and the Tacoma Narrows, Washington (tidal

  16. The global sustainability project and the LLNL China energy systems model

    International Nuclear Information System (INIS)

    Harris, N; Lamont, A; Stewart, J; Woodrow, C.

    1999-01-01

    The sustainability of our modern way of life is becoming a major concern of both our domestic and international policy. The Rio conference on the environment and the recent Kyoto conference on global climate change are two indications of the importance of solving global environmental problem. Energy is a key component in global sustainability since obtaining and using it has major environmental effects. If our energy systems are to be sustainable in the long run, they must be structured using technologies that have a minimal impact on our environment and resources. At the same time, they must meet practical economic requirements: they must be reasonably economical, they must meet the needs of society and they must be tailored to the resources that are available in a particular region or country. Because economic considerations and government policies both determine the development of the energy system, economic and systems modeling can help us better understand ways that new technologies and policies can be used to obtain a more sustainable system. The Global Sustainability Project has developed both economic modeling software and models to help us better understand these issues and has applied them to the analysis of energy and environmental problems in China. In the past year, the models and data developed by the project have been used to support other projects investigating the interaction of technologies and the environment. The project this year has focused on software development to improve our modeling tools and on the refinement and application of the China Energy System model. The major thrust of the software development has been improvements in the METANet economic software system. We have modified its solution algorithm to improve speed and accuracy of the solutions and to make it compatible with the SuperCode modeling system. It is planned to eventually merge the two systems to take advantage of the faster, more flexible solution algorithms of Super

  17. 78 FR 35630 - Martin Dam Hydroelectric Project; Notice of Availability of the Draft Environmental Impact...

    Science.gov (United States)

    2013-06-13

    ... Hydroelectric Project; Notice of Availability of the Draft Environmental Impact Statement for the Martin Dam Hydroelectric Project and Intention To Hold Public Meetings In accordance with the National Environmental Policy... the Martin Dam Hydroelectric Project (FERC No. 349), located on the Tallapoosa River in Tallapoosa...

  18. Telephone Flat Geothermal Development Project Environmental Impact Statement Environmental Impact Report. Final: Comments and Responses to Comments

    Energy Technology Data Exchange (ETDEWEB)

    None

    1999-02-01

    This document is the Comments and Responses to Comments volume of the Final Environmental Impact Statement and Environmental Impact Report prepared for the proposed Telephone Flat Geothermal Development Project (Final EIS/EIR). This volume of the Final EIS/EIR provides copies of the written comments received on the Draft EIS/EIR and the leady agency responses to those comments in conformance with the requirements of the National Environmental Policy Act (NEPA) and the California Environmental Quality Act (CEQA).

  19. Tiering strategic environmental assessment and project environmental impact assessment in highway planning in Sao Paulo, Brazil

    International Nuclear Information System (INIS)

    Sanchez, Luis E.; Silva-Sanchez, Solange S.

    2008-01-01

    Constructing highways in dense urban areas is always a challenge. In Sao Paulo Metropolitan Region, heavy truck traffic contributes to clog streets and expressways alike. As part of the traffic neither originates nor head to the region, a peripheral highway has been proposed to reduce traffic problems. This project, called Rodoanel, is an expressway approximately 175 km long. The fact that the projected south and north sections would cross catchments that supply most of the metropolis water demand was strongly disputed and made the environmental permitting process particularly difficult. The agency in charge commissioned a strategic environmental assessment (SEA) of a revamped project, and called it the Rodoanel Programme. However, the SEA report failed to satisfactorily take account of significant strategic issues. Among these, the highway potential effect of inducing urban sprawl over water protection zones is the most critical issue, as it emerged later as a hurdle to project licensing. Conclusion is that, particularly where no agreed-upon framework for SEA exists, when vertical tiering with downstream project EIA is sought, then a careful scoping of strategic issues is more than necessary. If an agreement on 'what is strategic' is not reached and not recognized by influential stakeholders, then the unsettled conflicts will be transferred to project EIA. In such a context, SEA will have added another loop to the usually long road to project approval

  20. Environmental education in Saudi general environment system - an engineering perspective

    International Nuclear Information System (INIS)

    Abdulrahman Salih Hariri

    2006-01-01

    The Saudi Cabinet of Ministers approved the Saudi General Environment System (SGES) in 2001. This approval is considered a step forward towards preserving the environment in Saudi Arabia. One of the targets of this system is to make environmental planning as an un-replaceable part of every comprehensive development planning in all industrial, agricultural, and architectural sectors. Achieving such a target requires a specialized labor force. Therefore, College of Engineering should act positively and actively in disseminating environmental awareness among engineers since they play a major rule in development projects. A degree in environmental engineering is a must at present, which is not available yet at any university in Saudi Arabia. Details of a B. Sc degree in environmental engineering offered by two universities in USA, are discussed. The syllabus of a degree in environment engineering adapted for the Saudi environment and culture is outlined

  1. 41 CFR 102-80.75 - Who assesses environmental issues in Federal construction and lease construction projects?

    Science.gov (United States)

    2010-07-01

    ... environmental issues in Federal construction and lease construction projects? 102-80.75 Section 102-80.75 Public... Management Assessment of Environmental Issues § 102-80.75 Who assesses environmental issues in Federal construction and lease construction projects? Federal agencies must assess required environmental issues...

  2. Report on the geo-environmental inquiry project, central and eastern Europe

    NARCIS (Netherlands)

    Mattig, U.; Mulder, E.F.J. de

    1998-01-01

    The Commission on Geological Sciences for Environmental Planning (COGEOENVIRONMENT) of IUGS and UNESCO have initiated a joint project to develop a worldwide data base on earthscience-related environmental problems and to assess which geoscientific information is available locally for prevention,

  3. 78 FR 43183 - Notice of Availability for Sharpe Permit Relinquishment Project Environmental Assessment Finding...

    Science.gov (United States)

    2013-07-19

    ... for Sharpe Permit Relinquishment Project Environmental Assessment Finding of No Significant Impact... Relinquishment Project Environmental Assessment (EA) Finding of No Significant Impact (FONSI). SUMMARY: On April... environment. Human environment was interpreted comprehensively to include the natural and physical environment...

  4. Lower Columbia River Terminal Fisheries Research Project : Final Environmental Assessment.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1995-04-01

    This notice announces BPA`S`s decision to fund the Oregon Department of Fish and Wildlife (ODFW), the Washington Department of Fish and Wildlife (WDFW), and the Clatsop Economic Development Committee for the Lower Columbia River Terminal Fisheries Research Project (Project). The Project will continue the testing of various species/stocks, rearing regimes, and harvest options for terminal fisheries, as a means to increase lower river sport and commercial harvest of hatchery fish, while providing both greater protection of weaker wild stocks and increasing the return of upriver salmon runs to potential Zone 6 Treaty fisheries. The Project involves relocating hatchery smolts to new, additional pen locations in three bays/sloughs in the lower Columbia River along both the Oregon and Washington sides. The sites are Blind Slough and Tongue Point in Clatsop County, Oregon, and Grays Bay/Deep River, Wahkiakum County, Washington. The smolts will be acclimated for various lengths of time in the net pens and released from these sites. The Project will expand upon an existing terminal fisheries project in Youngs Bay, Oregon. The Project may be expanded to other sites in the future, depending on the results of this initial expansion. BPA`S has determined the project is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an environmental impact statement is not required, and BPA`S is issuing this FONSI.

  5. Radioactive environmental impact assessment for a highway construction project in Guangdong province

    International Nuclear Information System (INIS)

    Qiu Guohua

    2009-01-01

    Based on the field environmental investigation and monitoring result, the radioactive environmental impact for a highway construction project in Guangdong province has been analyzed and assessed and forecacted. (authors)

  6. Environmental impact assessment of projects in the People's Republic of China: new law, old problems

    International Nuclear Information System (INIS)

    Wang Yan; Morgan, Richard K.; Cashmore, Mat

    2003-01-01

    After more than 20 years of experience with environmental impact assessment (EIA), the government of the People's Republic of China is set to introduce a new EIA Law, in September 2003, in which strategic environmental assessment (SEA) complements the current project-oriented EIA process. In general, the new law does not attempt to modify the existing EIA system in any radical ways, suggesting that the government consider current practices satisfactory. In order to assess the likely prospects of the new EIA Law for project-level EIA, this paper presents an evaluation of the current EIA process in China, first, establishing the historical context of the current process and, second, considering the main issues and concerns relating to the institutional and procedural arrangements, and practical implementation of the process. The main problems highlighted are as follows: the narrow historic focus on pollution of air, water and soil, at the expense of the consideration of wider environmental, social and health impacts; environmental protection agencies being funded by development-oriented local government administrations; the lack of consideration of alternatives in EIA processes; and the lack of effective public participation. More specific procedural issues are also discussed. On the basis of this analysis, we make recommendations for improving the effectiveness of EIA at the project level. The introduction of SEA in the new law marks a real step forward for EIA in China, although it appears to exclude central government policies, and there are improved provisions for public participation. However, the prospects for EIA in China will remain mixed as long as the new law leaves project-level EIA largely unchanged

  7. Effective use of environmental impact assessments (EIAs) for geothermal development projects

    International Nuclear Information System (INIS)

    Goff, S.J.

    2000-01-01

    Both the developed and developing nations of the world would like to move toward a position of sustainable development while paying attention to the restoration of natural resources, improving the environment, and improving the quality of life. The impacts of geothermal development projects are generally positive. It is important, however, that the environmental issues associated with development be addressed in a systematic fashion. Drafted early in the project planning stage, a well-prepared Environmental Impact Assessment (EIA) can significantly add to the quality of the overall project. An EIA customarily ends with the decision to proceed with the project. The environmental analysis process could be more effective if regular monitoring, detailed in the EIA, continues during project implementation. Geothermal development EIAs should be analytic rather than encyclopedic, emphasizing the impacts most closely associated with energy sector development. Air quality, water resources and quality, geologic factors, and socioeconomic issues will invariably be the most important factors. The purpose of an EIA should not be to generate paperwork, but to enable superb response. The EIA should be intended to help public officials make decisions that are based on an understanding of environmental consequences and take proper actions. The EIA process has been defined in different ways throughout the world. In fact, it appears that no two countries have defined it in exactly the same way. Going hand in hand with the different approaches to the process is the wide variety of formats available. It is recommended that the world geothermal community work towards the adoption of a standard. The Latin American Energy Organization (OLADE) and the Inter-American Development Bank (IDB)(OLADE, 1993) prepared a guide that presents a comprehensive discussion of the environmental impacts and suggested mitigation alternatives associated with geothermal development projects. The OLADE guide

  8. Integrated Safety, Environmental and Emergency Management System (ISEEMS)

    International Nuclear Information System (INIS)

    Silver, R.; Langwell, G.; Thomas, C.; Coffing, S.

    1996-01-01

    The Risk Management and NEPA (National Environmental Policy Act) Department of Sandia National Laboratories/New Mexico (SNL/NM) recognized the need for hazard and environmental data analysis and management to support the line managers' need to know, understand, manage and document the hazards in their facilities and activities. The Integrated Safety, Environmental, and Emergency Management System (ISEEMS) was developed in response to this need. SNL needed a process that would quickly and easily determine if a facility or project activity contained only standard industrial hazards and therefore require minimal safety documentation, or if non-standard industrial hazards existed which would require more extensive analysis and documentation. Many facilities and project activities at SNL would benefit from the quick screening process used in ISEEMS. In addition, a process was needed that would expedite the NEPA process. ISEEMS takes advantage of the fact that there is some information needed for the NEPA process that is also needed for the safety documentation process. The ISEEMS process enables SNL line organizations to identify and manage hazards and environmental concerns at a level of effort commensurate with the hazards themselves by adopting a necessary and sufficient (graded) approach to compliance. All hazard-related information contained within ISEEMS is location based and can be displayed using on-line maps and building floor plans. This visual representation provides for quick assimilation and analysis

  9. Environmental management audit, Uranium Mill Tailings Remedial Action Project (UMTRA)

    International Nuclear Information System (INIS)

    1993-01-01

    The Office of Environment, Safety and Health (EH) has established, as part of the internal oversight responsibilities within Department of Energy (DOE), a program within the Office of Environmental Audit (EH-24), to conduct environmental audits at DOE's operating facilities. This document contains the results of the Environmental Management Audit of the Uranium Mill Tailings Remedial Action (UMTRA) Project. This Environmental Management Audit was conducted by the DOE's Office of Environmental Audit from October 26 through November 6, 1992. The audit's objective is to advise the Secretary as to the adequacy of UMTRA's environmental programs, and management organization in ensuring environmental protection and compliance with Federal, state, and DOE environmental requirements. This Environmental Management Audit's scope was comprehensive and covered all areas of environmental management with the exception of environmental programs pertaining to the implementation of the requirements of the National Environmental Policy Act (NEPA), which is the responsibility of the DOE Headquarters Office of NEPA Oversight

  10. A comparative study on the Environmental Impact Assessment of industrial projects in Malaysia

    Science.gov (United States)

    Marmaya, E. A.; Mahbub, R.

    2018-02-01

    In the past decade, mankind has been manipulating the natural environment to better suit its needs for providing buildings and infrastructure for residential, commercial, business and industrial purposes. The rapid industrialization that has taken place has generated several issues regarding the environment. Therefore, managing environmental risks in construction projects has been recognized as an important process to achieve the project objectives in terms of time, cost, quality, safety and environmental sustainability. The aim of this research is to assess the environmental impact of industrial projects to the surrounding areas. The impact to the environment can be categorized into several aspects such as ecosystem impact, natural resources impact and public impact. This research employs the quantitative approach, that is, a questionnaire survey targeted at the occupants living in the surrounding areas of the case study location, namely the industrial sites in Sabah Ammonia Urea (SAMUR), Sipitang, Sabah and Lynas Advanced Materials Plant (LAMP), Gebeng Pahang. The findings of the research show that the two projects are perceived to have negative environmental impact especially for land pollution and green-house gas emissions.

  11. The enhancement of environmental literacy of High School students within the Sparkling Science project "Traisen w3"

    Science.gov (United States)

    Poppe, Michaela; Zitek, Andreas; Böck, Kerstin; Scheikl, Sigrid; Heidenreich, Andrea; Kurz-Aigner, Roman; Schrittwieser, Martin; Muhar, Susanne

    2015-04-01

    Environmental literacy is the knowledge necessary to understand the environment as an ecological system. It comprises the insight in the impact of human behaviour on the natural world and the disposition and motivation to apply ones knowledge, skills and insight in order to make environmentally beneficial decisions as rational citizen. The United Nations Environmental Programme states that young people will face major challenges in providing sufficient water and food, generating energy and adapting to climate change in future. Dealing with these challenges will require a major contribution from science and technology. But even more important, it is an issue of education to transfer the required system understanding as a basis to take informed decisions. In this way an education towards environmental literacy contributes significantly to the personal, social, and professional lives of young people, plays therefore a central role in young person`s "preparedness for life", and is a major prerequisite for sustainable development. For the purpose of developing new and engaging forms of learning, "Sparkling Science" projects are funded by the Federal Ministry of Science, Research and Economy in Austria. These projects target at integrating science with school learning by involving young people into scientific research. Within the Sparkling Science Projects "FlussAu:WOW" and" "Traisen.w3" scientists work together with 15-18-year-old students of an Austrian High School over four years. The projects aim to assess and evaluate crucial functions and processes of riverine landscapes particularly considering the floodplain area in near natural and anthropogenically changed landscapes. Within the first project "FlussAu:WOW" (2012-2014), students and scientists elaborated on indicators for assessing and evaluating the ecological functionality of floodplains and rivers. In a case study in the "Traisen.w3" project (2014-2016), scientists and students will focus at the catchment

  12. Speech-driven environmental control systems--a qualitative analysis of users' perceptions.

    Science.gov (United States)

    Judge, Simon; Robertson, Zoë; Hawley, Mark; Enderby, Pam

    2009-05-01

    To explore users' experiences and perceptions of speech-driven environmental control systems (SPECS) as part of a larger project aiming to develop a new SPECS. The motivation for this part of the project was to add to the evidence base for the use of SPECS and to determine the key design specifications for a new speech-driven system from a user's perspective. Semi-structured interviews were conducted with 12 users of SPECS from around the United Kingdom. These interviews were transcribed and analysed using a qualitative method based on framework analysis. Reliability is the main influence on the use of SPECS. All the participants gave examples of occasions when their speech-driven system was unreliable; in some instances, this unreliability was reported as not being a problem (e.g., for changing television channels); however, it was perceived as a problem for more safety critical functions (e.g., opening a door). Reliability was cited by participants as the reason for using a switch-operated system as back up. Benefits of speech-driven systems focused on speech operation enabling access when other methods were not possible; quicker operation and better aesthetic considerations. Overall, there was a perception of increased independence from the use of speech-driven environmental control. In general, speech was considered a useful method of operating environmental controls by the participants interviewed; however, their perceptions regarding reliability often influenced their decision to have backup or alternative systems for certain functions.

  13. West Valley Demonstration Project Annual Site Environmental Report (ASER) Calendar Year (2016)

    Energy Technology Data Exchange (ETDEWEB)

    Steiner, Alison F. [CH2M Hill BWXT West Valley, LLC, NY (United States); Pendl, Michael P. [CH2M Hill BWXT West Valley, LLC, NY (United States); Steiner, II, Robert E. [CH2M Hill BWXT West Valley, LLC, NY (United States); Fox, James R. [CH2M Hill BWXT West Valley, LLC, NY (United States); Hoch, Jerald J. [CH2M Hill BWXT West Valley, LLC, NY (United States); Williams, Janice D. [CH2M Hill BWXT West Valley, LLC, NY (United States); Wrotniak, Chester M. [CH2M Hill BWXT West Valley, LLC, NY (United States); Werchowski, Rebecca L. [CH2M Hill BWXT West Valley, LLC, NY (United States)

    2017-09-12

    West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2016. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2016. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2016 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  14. Environmental protection standards - from the point of view of systems analysis

    Energy Technology Data Exchange (ETDEWEB)

    Becker, K

    1978-11-01

    A project of the International Institute of Applied Systems Analysis (IIASA) in Laxenburg castle near Vienna is reviewed where standards for environmental protection are interpreted from the point of view of systems analysis. Some examples are given to show how results are influenced not only by technical and economic factors but also by psychological and political factors.

  15. Environmental protection standards - from the point of view of systems analysis

    International Nuclear Information System (INIS)

    Becker, K.

    1978-01-01

    A project of the International Institute of Applied Systems Analysis (IIASA) in Laxenburg castle near Vienna is reviewed where standards for environmental protection are interpreted from the point of view of systems analysis. Some examples are given to show how results are influenced not only by technical and economic factors but also by psychological and political factors. (orig.) [de

  16. Environmental Assessment for the Warren Station externally fired combined cycle demonstration project

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-04-01

    The proposed Penelec project is one of 5 projects for potential funding under the fifth solicitation under the Clean Coal Technology program. In Penelec, two existing boilers would be replaced at Warren Station, PA; the new unit would produce 73 MW(e) in a combined cycle mode (using both gas-fired and steam turbines). The project would fill the need for a full utility-size demonstration of externally fire combined cycle (EFCC) technology as the next step toward commercialization. This environmental assessment was prepared for compliance with NEPA; its purpose is to provide sufficient basis for determining whether to prepare an environmental impact statement or to issue a finding of no significant impact. It is divided into the sections: purpose and need for proposed action; alternatives; brief description of affected environment; environmental consequences, including discussion of commercial operation beyond the demonstration period.

  17. Status report : Terra Nova project environmental assessment panel : recommendations

    International Nuclear Information System (INIS)

    2002-01-01

    An application to the Canada-Newfoundland Offshore Petroleum Board (CNOPB) was submitted by Petro-Canada on August 5, 1996, notifying of its intent to develop the petroleum resources located at the Terra Nova field. The provincial and federal governments jointly appointed the Terra Nova Project Environmental Panel, and the board of the CNOPB referred to it the application documents for review. The environmental effects, considerations of human safety incorporated into the design and operation of the Project, the general approach to the development and exploitation of the petroleum resources, and the employment and industrial benefits expected to be derived from the Project were the issues under review by the Panel. On April 22, 1997, public hearings into the review began, and the final report was submitted to governments and the Board in August 1997. The report included 75 recommendations. The Project was approved in Decision 97.02 in December 1997, and the Board dealt with each of the recommendations. The respective positions of the Governments of Canada and Newfoundland and Labrador with regard to the recommendations that fell outside the jurisdiction of the Board were made public. A status report on every one of the 75 recommendations is provided in the present report. The recommendation is repeated, the verbatim response taken from Decision 97.02 included, followed by the status of the response. The production operations phase of the Project accounts for approximately 65 per cent of the recommendations. January 20, 2002 was the date the Project was begun

  18. Environmental systems analysis of biogas systems-Part II: The environmental impact of replacing various reference systems

    International Nuclear Information System (INIS)

    Boerjesson, Pal; Berglund, Maria

    2007-01-01

    This paper analyses the overall environmental impact when biogas systems are introduced and replace various reference systems for energy generation, waste management and agricultural production. The analyses are based on Swedish conditions using a life-cycle perspective. The biogas systems included are based on different combinations of raw materials and final use of the biogas produced (heat, power and transportation fuel). A general conclusion is that biogas systems normally lead to environmental improvements, which in some cases are considerable. This is often due to indirect environmental benefits of changed land use and handling of organic waste products (e.g. reduced nitrogen leaching, emissions of ammonia and methane), which often exceed the direct environmental benefits achieved when fossil fuels are replaced by biogas (e.g. reduced emissions of carbon dioxide and air pollutants). Such indirect benefits are seldom considered when biogas is evaluated from an environmental point of view. The environmental impact from different biogas systems can, however, vary significantly due to factors such as the raw materials utilised, energy service provided and reference system replaced

  19. Geo-hazard harmonised data a driven process to environmental analysis system

    Science.gov (United States)

    Cipolloni, Carlo; Iadanza, Carla; Pantaloni, Marco; Trigila, Alessandro

    2015-04-01

    In the last decade an increase of damage caused by natural disasters has been recorded in Italy. To support environmental safety and human protection, by reducing vulnerability of exposed elements as well as improving the resilience of the involved communities, it need to give access to harmonized and customized data that is one of several steps towards delivering adequate support to risk assessment, reduction and management. In this contest has been developed SEIS and Copernicus-GEMES as infrastructure based on web services for environmental analysis, to integrates in its own system specifications and results from INSPIRE. The two landslide risk scenarios developed in different European projects driven the harmonization process of data that represents the basic element to have interoperable web services in environmental analysis system. From two different perspective we have built a common methodology to analyse dataset and transform them into INSPIRE compliant format following the Data Specification on Geology and on Natural Risk Zone given by INSPIRE. To ensure the maximum results and re-usability of data we have also applied to the landslide and geological datasets a wider Data model standard like GeoSciML, that represents the natural extension of INSPIRE data model to provide more information. The aim of this work is to present the first results of two projects concerning the data harmonisation process, where an important role is played by the semantic harmonisation using the ontology service and/or the hierarchy vocabularies available as Link Data or Link Open Data by means of URI directly in the data spatial services. It will be presented how the harmonised web services can provide an add value in a risk scenario analysis system, showing the first results of the landslide environmental analysis developed by the eENVplus and LIFE+IMAGINE projects.

  20. Environmental radiation monitoring system

    International Nuclear Information System (INIS)

    Kato, Tsutomu; Shioiri, Masatoshi; Sakamaki, Tsuyoshi

    2007-01-01

    Environmental radiation monitoring systems are used to measure and monitoring gamma-rays at the observation boundaries of nuclear facilities and in the surrounding areas. In recent years, however, few new nuclear facilities have been constructed and the monitoring systems shift to renewal of existing systems. In addition, in order to increase public acceptance, the facilities are being equipped with communication lines to provide data to prefectural environmental centers. In this text, we introduce the latest technology incorporated in replacement of environmental radiation monitoring systems. We also introduce a replacement method that can shorten the duration during which environmental dose rate measurement is interrupted by enabling both the replacement system and the system being replaced to perform measurements in parallel immediately before and after the replacement. (author)

  1. Guidelines for comparative assessment of the environmental impacts of wastes from electricity generation systems. A framework for the assessment and comparison of environmental impacts

    International Nuclear Information System (INIS)

    1995-02-01

    The report describes the initial phase of a project intended to provide guidance to those concerned with environmental aspects of solid and hazardous waste management in electrical energy production systems. The focus is on describing a methodology for assessing and comparing the environmental impact arising from these wastes, and thereby to provide an input to overall electrical generation comparison projects, such as DECADES. The structure of the report is as follows: after considering a range of electrical energy production systems with an outline discussion of the waste streams produced in each case, the relevant treatment technologies and disposal options are reviewed. Then the elements of the framework for comparative assessment proposed in this report are described. The types of environmental impact, environmental protection criteria and indicators or end-points to measure the impact, the way in which such impacts can be quantitatively assessed and compared are discussed. 59 refs, figs and tabs

  2. Guidelines for the environmental impact statement for the proposed Great Whale River Hydroelectric Project. Backgorund information

    International Nuclear Information System (INIS)

    1992-09-01

    The guidelines presented on the preparation of the environmental impact statement for the Great Whale hydroelectric project by Hydro-Quebec stipulated a project justification, description of the biophysical and social environments, a project description, and that the assessment must address project impacts, mitigative and compensatory measures, environmental surveillance, monitoring, and long-term management programs. Background information presented in this document provides technical notes on the guidelines and the environmental assessment process, a glossary of terms, and biographical notes. The technical notes address guideline structure, project justification, native knowledge, evaluation issues, cumulative impacts, and the assessment and review process

  3. GENII: The Hanford Environmental Radiation Dosimetry Software System: Volume 1, Conceptual representation

    Energy Technology Data Exchange (ETDEWEB)

    Napier, B.A.; Peloquin, R.A.; Strenge, D.L.; Ramsdell, J.V.

    1988-12-01

    The Hanford Environmental Dosimetry Upgrade Project was undertaken to incorporate the internal dosimetry models recommended by the International Commission on Radiological Protection (ICRP) in updated versions of the environmental pathway analysis models used at Hanford. The resulting second generation of Hanford environmental dosimetry computer codes is compiled in the Hanford Environmental Dosimetry System (Generation II, or GENII). The purpose of this coupled system of computer codes is to analyze environmental contamination resulting from acute or chronic releases to, or initial contamination of, air, water, or soil. This is accomplished by calculating radiation doses to individuals or populations. GENII is described in three volumes of documentation. The first volume describes the theoretical considerations of the system. The second volume is a Users' Manual, providing code structure, users' instructions, required system configurations, and QA-related topics. The third volume is a Code Maintenance Manual for the user who requires knowledge of code detail. It includes code logic diagrams, global dictionary, worksheets, example hand calculations, and listings of the code and its associated data libraries. 72 refs., 15 figs., 34 tabs.

  4. GENII: The Hanford Environmental Radiation Dosimetry Software System: Volume 1, Conceptual representation

    International Nuclear Information System (INIS)

    Napier, B.A.; Peloquin, R.A.; Strenge, D.L.; Ramsdell, J.V.

    1988-12-01

    The Hanford Environmental Dosimetry Upgrade Project was undertaken to incorporate the internal dosimetry models recommended by the International Commission on Radiological Protection (ICRP) in updated versions of the environmental pathway analysis models used at Hanford. The resulting second generation of Hanford environmental dosimetry computer codes is compiled in the Hanford Environmental Dosimetry System (Generation II, or GENII). The purpose of this coupled system of computer codes is to analyze environmental contamination resulting from acute or chronic releases to, or initial contamination of, air, water, or soil. This is accomplished by calculating radiation doses to individuals or populations. GENII is described in three volumes of documentation. The first volume describes the theoretical considerations of the system. The second volume is a Users' Manual, providing code structure, users' instructions, required system configurations, and QA-related topics. The third volume is a Code Maintenance Manual for the user who requires knowledge of code detail. It includes code logic diagrams, global dictionary, worksheets, example hand calculations, and listings of the code and its associated data libraries. 72 refs., 15 figs., 34 tabs

  5. Conforth Ranch (Wanaket) Wildlife Mitigation Project. Draft Management Plan and Draft Environmental Assessment

    International Nuclear Information System (INIS)

    1995-03-01

    Bonneville Power Administration (BPA) proposes to mitigate for loss of wildlife habitat caused by the development of Columbia River Basin hydroelectric projects, including McNary dam. The proposed wildlife mitigation project involves wildlife conservation on 1140 hectares (ha)(2817 acres) of land (including water rights) in Umatilla County, Oregon. BPA has prepared an Environmental Assessment (EA)(DOE/EA- 1016) evaluating the proposed project. Based on the analysis in the EA, BPA has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an Environmental Impact Statement (EIS) is not required, and BPA is issuing this Finding of No Significant Impact (FONSI)

  6. Geography teachers' interpretation of a curriculum reform initiative: the case of the Lesotho Environmental Education Support Project (LEESP

    Directory of Open Access Journals (Sweden)

    Mohaeka Raselimo

    2013-01-01

    Full Text Available This article addresses how teachers in a specific developing world context interpreted a curriculum reform initiative. It is located within a broader interpretive study that investigated the integration of Environmental Education into the formal education system of Lesotho with particular reference to secondary school geography. More specifically the focus was on a Danish donor-fundedproject, known as the Lesotho Environmental Education Support Project (LEESP. Driven by a sustainable development imperative, the project was intended to assist Lesotho with the implementation of local action for Agenda 21 by introducing environmental education into the formal education system. It is widely accepted that teachers play an important role in implementing curriculum change. Using a previous framework, we generate insights for understanding how teachers' epistemologies interact with contextual factors to impede the process ofcurriculum sense-making. Furthermore, guided by the notion ofcurriculum as a contextualised social process, we present the findings on the contextual/structural factors enabling or constraining implementation ofthe LEESP curriculum policy intentions as perceived by the teachers.

  7. DESIGNING A MANAGEMENT MODEL FOR ACHIEVING ECONOMIC-ENVIRONMENTAL BALANCE IN INVESTMENT PROJECTS

    Directory of Open Access Journals (Sweden)

    Frantescu Marius

    2010-12-01

    Full Text Available This paper describes a method for achieving the economic-environmental balance based on the assessment of environmental and/or pollutant factors in connection to community option on the evaluation of investment projects having a major impact on environment. This assessment is based on the concept of welfare, the distinction between satisfaction and dissatisfaction and implies a practical approach including the scientific aspects of environment pollution degree and the community position on developing an investment project, by assuming responsibility for negative and positive aspects of such a project, respectively for satisfaction and dissatisfaction, in order to fulfill the supreme goal of preserving the environment and ensuring human welfare.

  8. Bear Creek Project. Draft environmental statement

    International Nuclear Information System (INIS)

    1977-01-01

    The Bear Creek Project consists of mining and milling operations involving uranium ore deposits located in Converse County, Wyoming. Mining of uranium from six known ore bodies will take place over ten years; a 1000 tons ore/day will be constructed and operated as long as ore is available. The tailings will be stored onsite in an impoundment. The project would convert 2700 acres from grazing use to mining/milling activities for about ten years. Mining would disturb a total of 1600 acres but, because of reclamation, the max acreage disturbed at any one time would be about 1000 acres, the average being about 650 acres. Dose rates were computed for an individual in a ranch house at the nearest ranch. Conditions for the protection of the environment are proposed. Possible environmental impacts evaluated cover air, land, water, soil, vegetation, wildlife, and community. A benefit-cost analysis is made

  9. State partnership in environmental health and safety phase of Plowshare projects

    Energy Technology Data Exchange (ETDEWEB)

    Kinsman, S [California State Department of Public Health, Berkeley, CA (United States)

    1969-07-01

    When experiments on projects involving Plowshare devices are conceived, the state chosen for the project should be invited to participate in planning the health and safety aspects and be prepared to actively participate in the D-Day phase as well as the post-detonation activity. In California nuclear science technology and competence have preceded the social acceptance and use of nuclear devices for large scale Plowshare projects. However, the environmental surveillance program of the Bureau of Radiological Health in the State Department of Public Health has established an operative program which will be ready and able to function as an active participant or in a support role in environmental health phases of nuclear projects scheduled in the State. A description of our present program will be included in this paper. This will enable the attendees and readers to realize capabilities which will be activated for participation and/or support roles during Plowshare activities in the State or in a neighboring state if the need arises. (author)

  10. State partnership in environmental health and safety phase of Plowshare projects

    International Nuclear Information System (INIS)

    Kinsman, S.

    1969-01-01

    When experiments on projects involving Plowshare devices are conceived, the state chosen for the project should be invited to participate in planning the health and safety aspects and be prepared to actively participate in the D-Day phase as well as the post-detonation activity. In California nuclear science technology and competence have preceded the social acceptance and use of nuclear devices for large scale Plowshare projects. However, the environmental surveillance program of the Bureau of Radiological Health in the State Department of Public Health has established an operative program which will be ready and able to function as an active participant or in a support role in environmental health phases of nuclear projects scheduled in the State. A description of our present program will be included in this paper. This will enable the attendees and readers to realize capabilities which will be activated for participation and/or support roles during Plowshare activities in the State or in a neighboring state if the need arises. (author)

  11. Environmental assessment for the National Conversion Pilot Project, Stage 3

    International Nuclear Information System (INIS)

    1997-01-01

    The purpose of the National Conversion Pilot Project (NCPP) is to explore and demonstrate, at the Rocky Flats Environmental Technology Site (RFETS), the feasibility of economic conversion at Department of Energy facilities. Economic conversion is the conversion of facilities and equipment owned by the Federal government to production of goods by private firms for profit. The NCPP mission is consistent with the RFETS current mission: to conduct site remediation, decontaminate and decommission site buildings and close the site in a manner that is safe, environmentally and socially responsible, physically secure, and cost effective. The NCPP is divided into three stages, with decision points at the ends of Stages 1 and 2 and periodically during Stage 3, to help ensure careful consideration of project effectiveness and to create an opportunity for regulators and stakeholders to provide comments to the DOE. At the end of each stage, the project can be reversed, authorized to proceed, or terminated

  12. Draft guidelines for the environmental impact study of the Great-Whale hydroelectric project

    International Nuclear Information System (INIS)

    1992-01-01

    The draft guidelines on the preparation of Hydro-Quebec's environmental and social impact statement for the proposed Great Whale River hydroelectric project are detailed. The guidelines cover project justification, description of the biophysical and social environments, project description, impacts of the project, mitigative measures, residual impacts and compensatory measures, environmental monitoring and follow-up programs. The proponent is asked to provide the justification for the project, including its general rationale, and to evaluate the long-term impact of the project. In justifying the project, the proponent should present energy demand and supply scenarios in sufficient detail to demonstrate the need for the project within the context of sustainable development. Long term impacts on the ecosystems of James Bay and Hudson Bay must be examined, as well as broad ecosystemic impacts such as those on the boreal forest, the tundra, as well as such considerations as global warming and changes in biological and cultural diversity

  13. Bear Creek Project. Final environmental statement

    International Nuclear Information System (INIS)

    1977-06-01

    The Bear Creek Project consists of certain mining and milling operations involving uranium ore deposits located in Converse County, Wyoming. Mining of uranium from nine known ore bodies will take place over a period of ten years (estimated); a mill with a nominal capacity of 1000 tons per day of ore will be constructed and operated as long as ore is available. The waste material (tailings) from the mill, also produced at a rate of about 1000 tons per day, will be stored onsite in an impoundment. Environmental impacts and adverse effects are summarized

  14. RNM and CRITER projects: providing access to environmental radioactivity measurements during crisis and in peacetime

    Energy Technology Data Exchange (ETDEWEB)

    Leprieur, F.; Couvez, C.; Manificat, G. [Institut de radioprotection et de surete nucleaire (France)

    2014-07-01

    each event in which any radiological health and environmental consequences or extent media coverage requires the establishment of a crisis organization, a specific CRITER database is created. Thus a CRITER IT system was implemented after the Fukushima accident in March 2011. In June 2013, during an exercise for the management of the post-accident phase at the Cattenom NPP, the CRITER system was used to give access to results from the new mobile measurements devices (land and air) to map, in real-time, the gamma dose rate at a large scale. Some data of measurements from Luxembourg and Germany have been also associated to the CRITER system. Both projects have developed complementary tools with compatible data repository, allowing on one hand to form a national reference database with measurements taken in normal situation from all environmental compartments and around each nuclear facility, but also a crisis database able to centralize quickly the new measurements made available from all those on the affected area and to make it available to decision-making bodies. These information systems will continue to evolve by taking into account not only technical improvements needed for their operation, but also the expectations and suggestions expressed by experts, policy-makers and the public. Document available in abstract form only. (authors)

  15. Environmental management system in companies

    International Nuclear Information System (INIS)

    Bonanno, C.

    1995-01-01

    The environmental management system, as the whole coordinated initiatives 'environmental oriented' introduced by companies in their organization, is discussed. Strategic weight that companies have to be present at the environmental management system is enlisted. Finally, the new professional figures of environmental technicians and environmental manager is discussed

  16. River Basin Information System: Open Environmental Data Management for Research and Decision Making

    Directory of Open Access Journals (Sweden)

    Franziska Zander

    2016-07-01

    Full Text Available An open, standardized data management and related service infrastructure is a crucial requirement for a seamless storage and exchange of data and information within research projects, for the dissemination of project results and for their application in decision making processes. However, typical project databases often refer to only one research project and are limited to specific purposes. Once implemented, those systems are often not further maintained and updated, rendering the stored information useless once the system stops operating. The River Basin Information System (RBIS presented here is designed to fit not only the requirements of one research project, but focuses on generic functions, extensibility and standards compliance typically found in interdisciplinary environmental research. Developed throughout more than 10 years of research cooperation worldwide, RBIS is designed to manage different types of environmental data with and without spatial context together with a rich set of metadata. Beside data management and storage, RBIS provides functions for the visualization, linking, analysis and processing of different types of data to support research, decision making, result dissemination and information discovery for all kinds of users. The focus of this paper is on the description of the technical implementation and the presentation of functions. This will be complemented by an overview of example applications and experiences during RBIS development and operation.

  17. Project delivery system (PDS)

    CERN Document Server

    2001-01-01

    As business environments become increasingly competitive, companies seek more comprehensive solutions to the delivery of their projects. "Project Delivery System: Fourth Edition" describes the process-driven project delivery systems which incorporates the best practices from Total Quality and is aligned with the Project Management Institute and ISO Quality Standards is the means by which projects are consistently and efficiently planned, executed and completed to the satisfaction of clients and customers.

  18. A New Project-Based Lab for Undergraduate Environmental and Analytical Chemistry

    Science.gov (United States)

    Adami, Gianpiero

    2006-01-01

    A new project-based lab was developed for third year undergraduate chemistry students based on real world applications. The experience suggests that the total analytical procedure (TAP) project offers a stimulating alternative for delivering science skills and developing a greater interest for analytical chemistry and environmental sciences and…

  19. Environmental impact assessment for the Nova projects (Building 391 complex)

    International Nuclear Information System (INIS)

    Odell, B.N.

    1979-01-01

    The environmental impact assessment of the Nova projects (Building 391 Complex) describes (1) the proposed actions, (2) the existing environment in and around the Livermore Valley, and (3) the potential environmental impacts from the construction and operation of these facilities. It shows that the proposed action does not conflict with any Federal, State, Regional, or Local Plans and Programs. Possible alternatives to the proposed action are discussed. However, it is concluded that the proposed actions were the most reasonable of the alternatives and would involve relatively minor adverse environmental impacts

  20. The importance of instrumental, symbolic, and environmental attributes for the adoption of smart energy systems

    International Nuclear Information System (INIS)

    Noppers, Ernst H.; Keizer, Kees; Milovanovic, Marko; Steg, Linda

    2016-01-01

    The conceptual model on motivations to adopt sustainable innovations (Noppers et al., 2014) proved to be successful in explaining proxies of the adoption of sustainable innovations: positive evaluations of the utility (instrumental attributes), environmental impact (environmental attributes), and specifically the extent to which the innovation says something about a person (symbolic attributes) increased interest in and intention to adopt sustainable innovations. In this paper, we examined to what extent the evaluations of these three attributes can also explain the actual adoption of smart energy systems that facilitate sustainable energy use. Results showed that adopters of smart energy systems (who agreed to participate in a project in which these systems were tested) evaluated the symbolic attributes of these systems more positively than non-adopters (who did not participate in this project), while both groups did not differ in their evaluation of the instrumental and environmental attributes of smart energy systems. A logistic regression analysis indicated that only evaluations of the symbolic attributes explained actual adoption of smart energy systems. Policy could stress and enhance the symbolic attributes of sustainable innovations to encourage adoption. - Highlights: • What drives consumer adoption of a sustainable innovation? • Evaluation of its symbolic attributes explained adoption of smart energy systems. • Evaluations of its instrumental and environmental attributes did not explain adoption. • Policy could stress and enhance symbolic attributes of smart energy systems.

  1. Radioactive environmental impact assessment for a production project of titanium dioxide by chlorination process

    International Nuclear Information System (INIS)

    Qiu Guohua

    2010-01-01

    Based on the analysis of shifting direction of radionuclide in production process and the environmental investigation and monitoring, the radioactive environmental impact from a production project of titanium dioxide by chlorination process has been analyzed and assessed. The result of radioactive environmental investigation shows that values of assessment factors are in the range of environmental radioactive background. The radioactive environmental sensitive spot has been delineated. The results of radioactive environmental prediction show that the additional doses to workers and residents are 0.59 mSv/a and 9.28 × 10-4 mSv/a respectively which are less than the annual dose limits of administration. The radioactive environmental impact of the production project of the titanium dioxide by chlorination process will meet the needs of national regulations and standards if radiation protection and environmental protection measures are implemented and radioactive environmental monitoring are strengthened. (author)

  2. The optimized baseline project: Reinventing environmental restoration at Hanford

    International Nuclear Information System (INIS)

    Goodenough, J.D.; Janaskie, M.T.; Kleinen, P.J.

    1994-01-01

    The U.S. Department of Energy Richland Operations Office (DOE-RL) is using a strategic planning effort (termed the Optimized Baseline Project) to develop a new approach to the Hanford Environmental Restoration program. This effort seeks to achieve a quantum leap improvement in performance through results oriented prioritization of activities. This effort was conducted in parallel with the renegotiation of the Tri-Party Agreement and provided DOE with an opportunity to propose innovative initiatives to promote cost effectiveness, accelerate progress in the Hanford Environmental Restoration Program and involve stakeholders in the decision-making process. The Optimized Baseline project is an innovative approach to program planning and decision-making in several respects. First, the process is a top down, value driven effort that responds to values held by DOE, the regulatory community and the public. Second, planning is conducted in a way that reinforces the technical management process at Richland, involves the regulatory community in substantive decisions, and includes the public. Third, the Optimized Baseline Project is being conducted as part of a sitewide Hanford initiative to reinvent Government. The planning process used for the Optimized Baseline Project has many potential applications at other sites and in other programs where there is a need to build consensus among diverse, independent groups of stakeholders and decisionmakers. The project has successfully developed and demonstrated an innovative approach to program planning that accelerates the pace of cleanup, involves the regulators as partners with DOE in priority setting, and builds public understanding and support for the program through meaningful opportunities for involvement

  3. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2007

    Energy Technology Data Exchange (ETDEWEB)

    West Valley Environmental Services LLC (WVES) and URS - Washington Division

    2008-12-17

    Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2007. The report summarizes the calendar year (CY) 2007 environmental protection program at the WVDP. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment.

  4. West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2007

    International Nuclear Information System (INIS)

    2008-01-01

    Annual Site Environmental Report for the West Valley Demonstration Project (WVDP) for Calendar Year 2007. The report summarizes the calendar year (CY) 2007 environmental protection program at the WVDP. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment

  5. Geographic information system for Long Island: An epidemiologic systems approach to identify environmental breast cancer risks on Long Island. Phase 1

    Energy Technology Data Exchange (ETDEWEB)

    Barancik, J.I.; Kramer, C.F.; Thode, H.C. Jr.

    1995-12-01

    BNL is developing and implementing the project ``Geographic Information System (GIS) for Long Island`` to address the potential relationship of environmental and occupational exposures to breast cancer etiology on Long Island. The project is divided into two major phases: The four month-feasibility project (Phase 1), and the major development and implementation project (Phase 2). This report summarizes the work completed in the four month Phase 1 Project, ``Feasibility of a Geographic Information System for Long Island.`` It provides the baseline information needed to further define and prioritize the scope of work for subsequent tasks. Phase 2 will build upon this foundation to develop an operational GIS for the Long Island Breast Cancer Study Project (LIBCSP).

  6. Geographic information system for Long Island: An epidemiologic systems approach to identify environmental breast cancer risks on Long Island. Phase 1

    International Nuclear Information System (INIS)

    Barancik, J.I.; Kramer, C.F.; Thode, H.C. Jr.

    1995-01-01

    BNL is developing and implementing the project ''Geographic Information System (GIS) for Long Island'' to address the potential relationship of environmental and occupational exposures to breast cancer etiology on Long Island. The project is divided into two major phases: The four month-feasibility project (Phase 1), and the major development and implementation project (Phase 2). This report summarizes the work completed in the four month Phase 1 Project, ''Feasibility of a Geographic Information System for Long Island.'' It provides the baseline information needed to further define and prioritize the scope of work for subsequent tasks. Phase 2 will build upon this foundation to develop an operational GIS for the Long Island Breast Cancer Study Project (LIBCSP)

  7. Environmental-impact assessment of dams and reservoir projects (review and a case study)

    International Nuclear Information System (INIS)

    Shah, S.M.

    2009-01-01

    Dams and reservoirs are among one of the most sensitive of all development Project, in terms of pervasiveness of their influence in altering the environmental conditions and resources. In the present study, major dams and reservoir projects are reviewed, from the environmental point of view. Dams and Reservoir projects bring about major changes in the immediate environment, thus affecting public health, settlements, farmlands, roads and historical sites. Impacts on human population and wildlife may be profound. Tropical diseases, involving fresh-water hosts or vectors in their transmission, are often common around new reservoirs. Large lakes create limnological changes, excessive evaporation, seepage, disturbance in water-table and increased tendencies of landslides and earthquakes. Micro climatic changes are possible, such as fog formation, increased cloudiness and modified rainfall-patterns. Retention of sediment results in silting up of reservoirs. Water shortages on mountain rivers may leave unsightly dry river-beds below a dam. Sediment deposition and growth of vegetation in reservoir affects the water-extraction for navigation power-generation and fishing. Various dams and reservoir projects in the world are critically studied, in terms of creating environmental impacts. The Kala Bagh Dam project (Pakistan), which is ready for construction, has been analysed as a case study, by matrix method. Analyses show that adverse effects of this dam are less than the benefits. It is recommended that based on the experience, appropriate lines and strategies may be drawn up to evaluate the local projects. Multidisciplinary experts need to be involved, for assessing environmental impacts and suggesting mitigation measures, to combat the adverse effects. (author)

  8. Project Risk Management

    Science.gov (United States)

    Jr., R. F. Miles

    1995-01-01

    Project risk management is primarily concerned with performance, reliability, cost, and schedule. Environmental risk management is primarily concerned with human health and ecological hazards and likelihoods. This paper discusses project risk management and compares it to environmental risk management, both with respect to goals and implementation. The approach of the Jet Propulsion Laboratory to risk management is presented as an example of a project risk management approach that is an extension to NASA NHB 7120.5: Management of Major System Programs and Projects.

  9. Socio-Economical, Environmental Evaluation of Ken-Betwa River Link Project, India

    Directory of Open Access Journals (Sweden)

    Pathak Hemant

    2016-10-01

    Full Text Available The India's ambitious Rs 9,393 crore Ken-Betwa river interlinking project will impact very significantly on Socio-economic life of two million people of Bundelkhand region, India. Water is an important input for survival and sustenance of life. The demand of this natural gift has been increasing exponentially. This ambitious project will help us in irrigation, potable water, cheap transportation, electricity as well as a source of livelihood for our ever increasing population. In Bundelkhand region, there is a severe problem of lack of irrigation in one region and water logging in others. Damage to crops due to drought and pitiable drainage facility could be managed. The objectives of the paper are to study socio-economical issues and environmental challenges in Ken-Betwa River link in India and to study environmental impact of this Project.

  10. Work plan for the Hanford Environmental Dose Reconstruction Project

    Energy Technology Data Exchange (ETDEWEB)

    1989-12-01

    The primary objective of the Hanford Environmental Dose Reconstruction (HEDR) Project is to estimate the radiation doses that populations could have received from nuclear operations at the Hanford Site since 1944, with descriptions of uncertainties inherent in such estimates. The secondary objective is to make project records--information that HEDR staff members used to estimate radiation doses--available to the public. Preliminary dose estimates for a limited geographic area and time period, certain radionuclides, and certain populations are planned to be available in 1990; complete results are planned to be reported in 1993. Project reports and references used in the reports are available to the public in the DOE Public Reading Room in Richland, Washington. Project progress is documented in monthly reports, which are also available to the public in the DOE Public Reading Room.

  11. Project Method, as One of the Basic Methods of Environmental Education

    Science.gov (United States)

    Szállassy, Noémi

    2008-01-01

    Our aim was to present in this paper the one of the most important methods of environmental education, the project method. We present here the steps and phases of project method and we give an example of how to use these elements in planning an activity for celebrating the World Day for Water.

  12. West Valley Demonstration Project Annual Site Environmental Report (ASER) for Calendar Year 2015

    International Nuclear Information System (INIS)

    Rendall, John D.; Steiner, Alison F.; Pendl, Michael P.; Biedermann, Charles A.; Steiner II, Robert E.; Fox, James R.; Hoch, Jerald J.; Wrotniak, Chester M.; Werchowski, Rebecca L.

    2016-01-01

    West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2015. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2015. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE's effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2015 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  13. West Valley Demonstration Project Annual Site Environmental Report (ASER) for Calendar Year 2014

    Energy Technology Data Exchange (ETDEWEB)

    Rendall, John D. [CH2M HILL BWXT West Valley, LLC, West Valley, NY (United States); Steiner, Alison F. [CH2M HILL BWXT West Valley, LLC, West Valley, NY (United States); Pendl, Michael P. [CH2M HILL BWXT West Valley, LLC, West Valley, NY (United States); Biedermann, Charles A. [CH2M HILL BWXT West Valley, LLC, West Valley, NY (United States); Steiner, II, Robert E. [CH2M HILL BWXT West Valley, LLC, West Valley, NY (United States); Fox, James R. [CH2M HILL BWXT West Valley, LLC, West Valley, NY (United States); Hoch, Jerald J. [CH2M HILL BWXT West Valley, LLC, West Valley, NY (United States); Werchowski, Rebecca L. [CH2M HILL BWXT West Valley, LLC, West Valley, NY (United States)

    2015-09-15

    West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2014. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2014. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2014 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  14. West Valley Demonstration Project Annual Site Environmental Report (ASER) for Calendar Year 2015

    Energy Technology Data Exchange (ETDEWEB)

    Rendall, John D. [CH2M HILL BWXT West Valley, LLC, West Valley, NY (United States); Steiner, Alison F. [CH2M HILL BWXT West Valley, LLC, West Valley, NY (United States); Pendl, Michael P. [CH2M HILL BWXT West Valley, LLC, West Valley, NY (United States); Biedermann, Charles A. [CH2M HILL BWXT West Valley, LLC, West Valley, NY (United States); Steiner, II, Robert E. [CH2M HILL BWXT West Valley, LLC, West Valley, NY (United States); Fox, James R. [CH2M HILL BWXT West Valley, LLC, West Valley, NY (United States); Hoch, Jerald J. [CH2M HILL BWXT West Valley, LLC, West Valley, NY (United States); Wrotniak, Chester M. [CH2M HILL BWXT West Valley, LLC, West Valley, NY (United States); Werchowski, Rebecca L. [CH2M HILL BWXT West Valley, LLC, West Valley, NY (United States)

    2016-09-15

    West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2015. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2015. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2015 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

  15. A cost benefit review of applying quality assurance principles to project management of environmental cleanup programs

    International Nuclear Information System (INIS)

    Oakes, T.W.

    1989-01-01

    This paper shows the cost/benefit mechanism used for applying the theory and practical aspects of QA principles as a management tool to project management of environmental cleanup projects. This includes reviewing and guidelines and requirements to determine the practical aspects of applying these requirements to environmental project management. Thus, there is a feedback loop for comparison of the cost/benefits of application of each stage of the project. The project's major stages include planning, environmental sampling, analysis of data samples, data/information management to include reporting, and follow- up, post-cleanup sampling with continued data management. A comparison is also made of the theory with the practical aspects of each of these stages

  16. The Waste Isolation Pilot Plant (WIPP) integrated project management system

    International Nuclear Information System (INIS)

    Olona, D.; Sala, D.

    1993-01-01

    The Waste Isolation Pilot Plant (WIPP), located 26 miles east of Carlsbad, New Mexico, is a research and development project of the Department of Energy (DOE), tasked with the mission of demonstrating the safe disposal of transuranic (TRU) radioactive wastes. This unique project was authorized by Congress in 1979 in response to the national need for long-term, safe methods for disposing of radioactive by-products from our national defense programs. The WIPP was originally established in December of 1979, by Public Law 96-164, DOE National Security and Military Applications of Nuclear Energy Authorization Act of 1980. Since the inception of the WIPP Project, work has continued to prepare the facility to receive TRU wastes. Studies continue to be conducted to demonstrate the safety of the WIPP facility in accordance with federal and state laws, state agreements, environmental regulations, and DOE Orders. The objectives of implementing an integrated project management system are to assure compliance with all regulatory and federal regulations, identify areas of concern, provide justification for funding, provide a management tool for control of program workscope, and establish a project baseline from which accountability and performance will be assessed. Program management and project controls are essential for the success of the WIPP Project. The WIPP has developed an integrated project management system to establish the process for the control of the program which has an expected total dollar value of $2B over the ten-year period from 1990-2000. The implementation of this project management system was motivated by the regulatory requirements of the project, the highly public environment in which the project takes place, limited funding and resources, and the dynamic nature of the project. Specific areas to be addressed in this paper include strategic planning, project organization, planning and scheduling, fiscal planning, and project monitoring and reporting

  17. Meeting the requirements for a DOE environmental restoration project. The Fernald strategy

    International Nuclear Information System (INIS)

    Vanoss, R.L.; Risenhoover, G.M.

    1994-01-01

    Environmental Restoration (ER) of five Operable Units (OU) at Fernald Environmental Management Project (FEMP) includes compliance with the requirements of Comprehensive Environmental Response, Compensation and Liability Act (CERCLA), Resource Conservation Recovery Act (RCRA), National Environmental Policy Act (NEPA), and DOE Orders. Each regulatory driver has differing procedural requirements for documenting calculations, decisions, and actions involved in site cleanup. Integration of documentation and avoidance of duplication can save time and money. Such savings are being achieved by OU specific application of supporting studies, revised procedures, and guidance documents. Each OU is seeking appropriate opportunities to produce single documents that simultaneously fulfill the important requirements of the other regulations and DOE orders. These opportunities are evaluated at all phases of decision making, remedial design, and remedial action. Three essential processes precede environmental restoration/remedial action at a DOE site/project: 1. Completion of decision-making documents required by governing or applicable statutes. 2. Completion of important scientific and engineering analyses of remedial alternatives, and design and implementation of the remedial solution established in the CERCLA Record of Decision (ROD). 3. Preparation of DOE-mandated documentation to record engineering evaluations and cost estimates required for budgeting, decision making, and project management. Methodology and requirements for each process have developed from long, successful practice, but independently of each other. FERMCO, as new DOE contractor at Fernald and first Environmental Restoration Management Contractor (ERMC), is committed to a process of Continuous Performance Improvement (CPI). A major reevaluation of documentation and processes for support of environmental decision-making and design of cleanup activities to remediate the five OUs at the FEMP is being undertaken

  18. Environmental impact assessment system in Thailand and its comparison with those in China and Japan

    International Nuclear Information System (INIS)

    Suwanteep, Kultip; Murayama, Takehiko; Nishikizawa, Shigeo

    2016-01-01

    This paper aims to find ways to streamline the Environmental Impact Assessment (EIA) system in Thailand to increase its effectiveness by comparative analysis with China and Japan. This study is mainly focused on review, update and comparison of EIA systems between these three countries. It is intended to clarify fundamental information of the EIA systems and characteristics of the key elements of EIA processes (screening, consideration of alternatives, prediction or evaluation of impact, and public participation). Moreover, the number of the EIA projects that have been implemented in all the provinces in Thailand are presented. The results identified the similarities and differences of the EIA processes among the three aforementioned countries. The type of EIA report used in Thailand, unlike those in China and Japan, is an Environmental and Health Impact Assessment (EHIA), which is concerned with the health and environmental impacts that could occur from the project. In addition, EIA reports in Thailand are made available to the public online and the shortcomings of the process have details of barriers resulting from the projects to help future projects with reconsideration and improvements. In this study, it is pointed out that Thai's EIA system still lacks local EIA authority which needs to be empowered by implementing a set of laws or ordinance. - Highlights: • Reviewed current EIA procedures in Thailand, Japan and China • The EIA database is getting improved so as to generate profile of EIAs in the past. • Thailand needs to empower the local EIA authority within the EIA system. • The potential impacts should be more concerned than their scale in Japanese EIA. • Time limits and transparency should be reconsidered in China's EIA system.

  19. A Spatially Intelligent Public Participation System for the Environmental Impact Assessment Process

    Directory of Open Access Journals (Sweden)

    Lei Lei

    2013-05-01

    Full Text Available An environmental impact assessment (EIA is a decision-making process that evaluates the possible significant effects that a proposed project may exert on the environment. The EIA scoping and reviewing stages often involve public participation. Although its importance has long been recognized, public participation in the EIA process is often regarded as ineffective, due to time, budget, resource, technical and procedural constraints, as well as the complexity of environmental information. Geographic Information System (GIS and Volunteer Geographic Information (VGI have the potential to contribute to data collection, sharing and presentation, utilize local user-generated content to benefit decision-making and increase public outreach. This research integrated GIS, VGI, social media tools, data mining and mobile technology to design a spatially intelligent framework that presented and shared EIA information effectively to the public. A spatially intelligent public participative system (SIPPS was also developed as a proof-of-concept of the framework. The research selected the Tehachapi Renewable Transmission Project (TRTP as the pilot study area. Survey questionnaires were designed to collect feedback and conduct evaluation. Results show that SIPPS was able to improve the effectiveness of public participation, promote environmental awareness and achieve good system usability.

  20. Integrated Project Management System description

    International Nuclear Information System (INIS)

    1987-03-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project is a Department of Energy (DOE) designated Major System Acquisition (MSA). To execute and manage the Project mission successfully and to comply with the MSA requirements, the UMTRA Project Office (''Project Office'') has implemented and operates an Integrated Project Management System (IPMS). The Project Office is assisted by the Technical Assistance Contractor's (TAC) Project Integration and Control (PIC) Group in system operation. Each participant, in turn, provides critical input to system operation and reporting requirements. The IPMS provides a uniform structured approach for integrating the work of Project participants. It serves as a tool for planning and control, workload management, performance measurement, and specialized reporting within a standardized format. This system description presents the guidance for its operation. Appendices 1 and 2 contain definitions of commonly used terms and abbreviations and acronyms, respectively. 17 figs., 5 tabs

  1. Proposed IMS infrastructure improvement project, Seward, Alaska. Final environmental impact statement

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-01

    This Environmental Impact Statement (EIS) examines a proposal for improvements at the existing University of Alaska, Fairbanks, Institute of Marine Science (IMS), Seward Marine Center. The Exxon Valdez Oil Spill (EVOS) Trustee Council is proposing to improve the existing research infrastructure to enhance the EVOS Trustee Council`s capabilities to study and rehabilitate marine mammals, marine birds, and the ecosystem injured by the Exxon Valdez oil spill. The analysis in this document focuses on the effects associated with construction and operation of the proposed project and its proposed alternatives. The EIS gives a detailed description of all major elements of the proposed project and its alternatives; identifies resources of major concern that were raised during the scoping process; describes the environmental background conditions of those resources; defines and analyzes the potential effects of the proposed project and its alternatives on these conditions; and identifies mitigating measures that are part of the project design as well as those proposed to minimize or reduce the adverse effects. Included in the EIS are written and oral comments received during the public comment period.

  2. Proposed IMS infrastructure improvement project, Seward, Alaska. Final environmental impact statement

    International Nuclear Information System (INIS)

    1994-09-01

    This Environmental Impact Statement (EIS) examines a proposal for improvements at the existing University of Alaska, Fairbanks, Institute of Marine Science (IMS), Seward Marine Center. The Exxon Valdez Oil Spill (EVOS) Trustee Council is proposing to improve the existing research infrastructure to enhance the EVOS Trustee Council's capabilities to study and rehabilitate marine mammals, marine birds, and the ecosystem injured by the Exxon Valdez oil spill. The analysis in this document focuses on the effects associated with construction and operation of the proposed project and its proposed alternatives. The EIS gives a detailed description of all major elements of the proposed project and its alternatives; identifies resources of major concern that were raised during the scoping process; describes the environmental background conditions of those resources; defines and analyzes the potential effects of the proposed project and its alternatives on these conditions; and identifies mitigating measures that are part of the project design as well as those proposed to minimize or reduce the adverse effects. Included in the EIS are written and oral comments received during the public comment period

  3. West Valley Demonstration Project site environmental report calendar year 1998

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-06-01

    This report represents a single, comprehensive source of off-site and on-site environmental monitoring data collected during 1998 by environmental monitoring personnel for the West Valley Demonstration Project (WVDP), West Valley, New York. The environmental monitoring program and results are discussed in the body of this report. The monitoring data are presented in the appendices. The data collected provide an historical record of radionuclide and radiation levels from natural and manmade sources in the survey area and document the quality of the groundwater on and around the WVDP and the quality of the air and water discharged by the WVDP.

  4. West Valley Demonstration Project site environmental report, calendar year 1999

    Energy Technology Data Exchange (ETDEWEB)

    None Available

    2000-06-01

    This report represents a single, comprehensive source of off-site and on-site environmental monitoring data collected during 1999 by environmental monitoring personnel for the West Valley Demonstration Project (WVDP), West Valley, New York. The environmental monitoring program and results are discussed in the body of this report. The monitoring data are presented in the appendices. The data collected provide an historical record of radionuclide and radiation levels from natural and manmade sources in the survey area and document the quality of the groundwater on and around the WVDP and the quality of the air and water discharged by the WVDP.

  5. West Valley Demonstration Project site environmental report, calendar year 1997

    Energy Technology Data Exchange (ETDEWEB)

    None

    1998-06-01

    This report represents a single, comprehensive source of off-site and on-site environmental monitoring data collected during 1997 by environmental monitoring personnel for the West Valley Demonstration Project (WVDP), West Valley, New York. The environmental monitoring program and results are discussed in the body of this report. The monitoring data are presented in the appendices. The data collected provide an historical record of radionuclide and radiation levels from natural and manmade sources in the survey area and document the quality of the groundwater on and around the WVDP and the quality of the air and water discharged by the WVDP.

  6. Resource Contingency Program - Oregon : Final Environmental Impact Statement, Hermiston Power Project.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1995-09-01

    The Bonneville Power Administration (BPA) has statutory responsibilities to supply electrical power to its utility, industrial, and other customers in the Pacific Northwest. In 1990, to cover the outer range of potential load growth with new resources, BPA embarked upon the Resource Contingency Program (RCP). Instead of buying or building generating plants now, BPA has purchased options to acquire power later, if and when it is needed. The decision to acquire any of these option energy projects to fulfill statutory supply obligations will be influenced by Federal system load growth, the outcome of BPA`s Business Plan, required operational changes in Columbia-Snake River Hydroelectric facilities, and the loss of major generating resources. In September 1993, three option development agreements were signed with three proposed natural gas-fired, combined cycle combustion turbine CT projects near Chehalis and Satsop, Washington, and near Hermiston, Oregon. Together these three projects could supply BPA with 1,090 average megawatts (aMW) of power. Under these agreements, sponsors are obtaining permits and conducting project design work, and BPA is completing this EIS process. In September 1993, BPA published a Notice of Intent to prepare an environmental impact statement (EIS) on these three proposed gas-fired combustion turbine projects and held public scoping meetings in October 1993 at each site. In February 1994, BPA released an Implementation Plan on the proposed scope of the EIS. A draft EIS on the three proposed projects was published in February 1995. The impacts of the Chehalis and Satsop projects located in Washington State will be covered in one EIS document, while the impacts of the Hermiston project located in Oregon are covered in this final EIS document. It is BPA`s intent to continue to base the analysis of impacts on the assumption that all three projects may be constructed at some point in the future.

  7. Resource contingency program - Oregon. Final environmental impact statement, Hermiston power project

    International Nuclear Information System (INIS)

    1995-09-01

    The Bonneville Power Administration (BPA) has statutory responsibilities to supply electrical power to its utility, industrial, and other customers in the Pacific Northwest. In 1990, to cover the outer range of potential load growth with new resources, BPA embarked upon the Resource Contingency Program (RCP). Instead of buying or building generating plants now, BPA has purchased options to acquire power later, if and when it is needed. The decision to acquire any of these option energy projects to fulfill statutory supply obligations will be influenced by Federal system load growth, the outcome of BPA's Business Plan, required operational changes in Columbia-Snake River Hydroelectric facilities, and the loss of major generating resources. In September 1993, three option development agreements were signed with three proposed natural gas-fired, combined cycle combustion turbine CT projects near Chehalis and Satsop, Washington, and near Hermiston, Oregon. Together these three projects could supply BPA with 1,090 average megawatts (aMW) of power. Under these agreements, sponsors are obtaining permits and conducting project design work, and BPA is completing this EIS process. In September 1993, BPA published a Notice of Intent to prepare an environmental impact statement (EIS) on these three proposed gas-fired combustion turbine projects and held public scoping meetings in October 1993 at each site. In February 1994, BPA released an Implementation Plan on the proposed scope of the EIS. A draft EIS on the three proposed projects was published in February 1995. The impacts of the Chehalis and Satsop projects located in Washington State will be covered in one EIS document, while the impacts of the Hermiston project located in Oregon are covered in this final EIS document. It is BPA's intent to continue to base the analysis of impacts on the assumption that all three projects may be constructed at some point in the future

  8. Sierra Pacific Power Company Alturas Transmission Line Project, Final Environmental Impact Report/Environmental Impact Statement. Volume 3: Appendices

    International Nuclear Information System (INIS)

    1995-11-01

    Sierra Pacific Power Company has proposed the construction and operation of a 345,000 volt overhead electric power transmission line from Alturas, California to Reno, Nevada. This Environmental Impact Report/Environmental Impact Statement will assess the potential environmental impacts of the proposed project and alternatives. This report contains Appendices A--I which contain the following: glossary/abbreviations; scoping report; structure coordinate summary; air quality; biological resources; geology; noise; visual contrast rating forms; and cultural resources

  9. Performance of newly implemented Environmental Management Systems in primary schools in South Africa.

    Science.gov (United States)

    Hens, Luc; Wiedemann, Torsten; Raath, Schalk; Stone, Riana; Renders, Paul; Craenhals, Eric

    2010-01-01

    Quantitative results from Environmental Management Systems (EMS) at primary schools have rarely been examined in literature. This paper presents the monitoring results of environmental care in 39 primary schools in Northern South Africa. During 2 years, after the EMS was implemented in the curriculum and in the school's management, the progress of environmental performances of the participating schools has been measured, by means of detailed questionnaires, related to four environmental aspects: water, waste, energy and greening. At the beginning of the project, 50% of the schools performed well on water-related environmental actions. Two years later it was 76%. For waste-related activities the improvement was even stronger: from 50% to 100%. The environmental performances of the schools improved also for greening-related actions, from 50% at the start of the project to 64% two years later. Only energy-related activities did not improve significantly with only 24% of all schools performing well at the end of the survey period. In general, the introduction of an EMS succeeded in an improvement of the overall environmental performances of the schools, but cost-intensive activities were less successful than others. Copyright 2009 Elsevier Ltd. All rights reserved.

  10. Sound Waste Management Plan environmental operations, and used oil management system: Restoration project 97115. Exxon Valdez oil spill restoration project final report: Volumes 1 and 2

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-06-01

    This project constitutes Phase 2 of the Sound Waste Management Plan and created waste oil collection and disposal facilities, bilge water collection and disposal facilities, recycling storage, and household hazardous waste collection and storage, and household hazardous waste collection and storage facilities in Prince William Sound. A wide range of waste streams are generated within communities in the Sound including used oil generated from vehicles and vessels, and hazardous wastes generated by households. This project included the design and construction of Environmental Operations Stations buildings in Valdez, Cordova, Whittier, Chenega Bay and Tatitlek to improve the overall management of oily wastes. They will house new equipment to facilitate oily waste collection, treatment and disposal. This project also included completion of used oil management manuals.

  11. Sound Waste Management Plan environmental operations, and used oil management system: Restoration project 97115. Exxon Valdez oil spill restoration project final report: Volumes 1 and 2

    International Nuclear Information System (INIS)

    1998-06-01

    This project constitutes Phase 2 of the Sound Waste Management Plan and created waste oil collection and disposal facilities, bilge water collection and disposal facilities, recycling storage, and household hazardous waste collection and storage, and household hazardous waste collection and storage facilities in Prince William Sound. A wide range of waste streams are generated within communities in the Sound including used oil generated from vehicles and vessels, and hazardous wastes generated by households. This project included the design and construction of Environmental Operations Stations buildings in Valdez, Cordova, Whittier, Chenega Bay and Tatitlek to improve the overall management of oily wastes. They will house new equipment to facilitate oily waste collection, treatment and disposal. This project also included completion of used oil management manuals

  12. Transportation of foreign-owned enriched uranium from the Republic of Georgia. Environmental assessment for Project Partnership

    International Nuclear Information System (INIS)

    1998-01-01

    The Department of Energy (DOE) Office of Nonproliferation and National Security (NN) has prepared a classified environmental assessment to evaluate the potential environmental impact for the transportation of 5.26 kilograms of enriched uranium-235 in the form of nuclear fuel, from the Republic of Georgia to the United Kingdom. The nuclear fuel consists of primarily fresh fuel, but also consists of a small quantity (less than 1 kilogram) of partially-spent fuel. Transportation of the enriched uranium fuel would occur via US Air Force military aircraft under the control of the Defense Department European Command (EUCOM). Actions taken in a sovereign nation (such as the Republic of Georgia and the United Kingdom) are not subject to analysis in the environmental assessment. However, because the action would involve the global commons of the Black Sea and the North Sea, the potential impact to the global commons has been analyzed. Because of the similarities in the two actions, the Project Sapphire Environmental Assessment was used as a basis for assessing the potential impacts of Project Partnership. However, because Project Partnership involves a small quantity of partially-spent fuel, additional analysis was conducted to assess the potential environmental impacts and to consider reasonable alternatives as required by NEPA. The Project Partnership Environmental Assessment found the potential environmental impacts to be well below those from Project Sapphire

  13. Blue Creek Winter Range: Wildlife Mitigation Project. Final environmental assessment

    International Nuclear Information System (INIS)

    1994-11-01

    Bonneville Power Administration (BPA) proposes to fund that portion of the Washington Wildlife Agreement pertaining to the Blue Creek Winter Range Wildlife Mitigation Project (Project) in a cooperative effort with the Spokane Tribe, Upper Columbia United Tribes, and the Bureau of Indian Affairs (BIA). If fully implemented, the proposed action would allow the sponsors to protect and enhance 2,631 habitat units of big game winter range and riparian shrub habitat on 2,185 hectares (5,400 acres) of Spokane Tribal trust lands, and to conduct long term wildlife management activities within the Spokane Indian Reservation project area. This Final Environmental Assessment (EA) examines the potential environmental effects of securing land and conducting wildlife habitat enhancement and long term management activities within the boundaries of the Spokane Indian Reservation. Four proposed activities (habitat protection, habitat enhancement, operation and maintenance, and monitoring and evaluation) are analyzed. The proposed action is intended to meet the need for mitigation of wildlife and wildlife habitat adversely affected by the construction of Grand Coulee Dam and its reservoir

  14. The Hanford Environmental Dose Reconstruction (HEDR) Project: Technical approach

    International Nuclear Information System (INIS)

    Napier, B.A.; Freshley, M.D.; Gilbert, R.O.; Haerer, H.A.; Morgan, L.G.; Rhoads, R.E.; Woodruff, R.K.

    1990-01-01

    Historical measurements and current assessment techniques are being combined to estimate potential radiation doses to people from radioactive releases to the air, the Columbia River, soils, and ground water at the Hanford Site since 1944. Environmental contamination from these releases has been monitored, at varying levels of detail, for 45 yr. Phase I of the Hanford Environmental Reconstruction Project will estimate the magnitude of potential doses, their areal extends, and their associated uncertainties. The Phase I study area comprises 10 counties in eastern Washington and northern Oregon, within a 100-mi radius of the site, including a stretch of the Columbia River that was most significantly affected. These counties contain a range of projected and measured contaminant levels, environmental exposure pathways, and population groups. Phase I dose estimates are being developed for the periods 1944 through 1947 for air pathways and 1964 through 1966 for river pathways. Important radionuclide/pathway combinations include fission products, such as 131 I, in milk for early atmospheric releases and activation products, such as 32 P and 65 Zn, in fish for releases to the river. Potential doses range over several orders of magnitude within the study area. We will expand the time periods and study are in three successive phases, as warranted by results of Phase I

  15. Auditing of environmental management system

    Directory of Open Access Journals (Sweden)

    Čuchranová Katarína

    2001-12-01

    Full Text Available Environmental auditing has estabilished itself as a valueable instrument to verify and help to improve the environmental performance.Organizations of all kinds may have a need to demonstrate the environmental responsibility. The concept of environmental management systems and the associated practice of environmental auditing have been advanced as one way to satisfy this need.These system are intended to help an organization to establish and continue to meet its environmental policies, objectives, standards and other requirements.Environmental auditing is a systematic and documented verification process of objectively obtaining and evaluating audit evidence to determine whether an organizations environmental management system conforms to the environmental management system audit criteria set by the organization and for the communication of the results of this process to the management.The following article intercepts all parts of preparation environmental auditing.The audit programme and procedures should cover the activities and areas to be considered in audits, the frequency of audits, the responsibilities associated with managing and conducting audits, the communication of audit results, auditor competence, and how audits will be conducted.The International Standard ISO 140011 estabilishes the audit procedures that determine conformance with EMS audit criteria.

  16. Department of Energy environmental management complex-wide integration using systems engineering

    International Nuclear Information System (INIS)

    Fairbourn, P.

    1997-01-01

    A systems engineering approach was successfully used to recommend changes to environmental management activities across the DOE Complex. A team of technical experts and systems engineers developed alternatives that could save tax payers billions of dollars if the barriers are removed to allow complete implementation. The alternatives are technically-based and defensible, and are being worked through the stakeholder review process. The integration process and implementing project structure are both discussed

  17. A review of Environmental Impact Assessment parameters required for set up of a hydropower project

    International Nuclear Information System (INIS)

    Roy, Pankaj Kumar; Mazumdar, Asis

    2013-01-01

    Environmental Impact Assessment in general, hydro-meteorological conditions, topography, hydrology, water availability analysis of a river system, importance of hydropower and feasibility study of Environmental Impact assessment due to the construction of the hydropower plant have been discussed in this research work. The site selection is one of the major components so far the hydropower is concerned and also the minimum flow should have known to us so that the capacity of a hydropower plant can be predicted. The sustainable flow, which refers the flow is available throughout the year, has been calculated based on flow duration curve. This study highlights the environmental impact assessment particularly related to hydropower project. Here the study area a district town located in the eastern region of India on the banks of river Kosi has been considered. The historical rainfall and the river discharge data have been collected from various organizations. The stage-discharge correlation and hydrological parameters related to hydropower have been analyzed and also to discuss the review of environmental impact assessment in hydropower project. The EIA analysis can be also carried out by using fuzzy logic wherein the EIA parameters can be given different weight-age based on the various survey reports that have been carried out at different places at different time. Such analysis has also been provided below based on the various data obtained.

  18. Application of environmental impact assessment in Spain (1989-2008): the case of Road Projects

    International Nuclear Information System (INIS)

    Barbero Rodriguez, J.; Espigares Pinilla, T.

    2010-01-01

    In this study we analyze the application in Spain of the Environmental Impact Assessment (EIA) along the first 20 years since its implementation, paying special attention to road projects. We revised all Environmental Impact Statement (EISs) published during the period 1989-2008 and monitored, among others, the following variables; the record of decision (favorable or unfavorable) of the State Authority, the type of ecosystem affected by the projects and the mitigation measures required to the developer to implement the project. The results allow us to evaluate the effectiveness of EIA procedure for road projects and to suggest some practical recommendations to improve the quality of EISs. (Author) 13 refs.

  19. Notice of availability, final environmental impact statement, Beaufort Sea oil and gas development/Northstar Project

    International Nuclear Information System (INIS)

    1999-01-01

    BP Exploration (Alaska) Inc. (BPXA) is proposing to develop the Northstar Unit, located approximately 6 miles offshore of Point Storkensen in the Alaskan Beaufort Sea. BPXA's proposed action is a self-contained development/production facility located on a reconstructed gravel island in 39 feet of water. Also proposed is construction of two buried subsea pipelines between the island and shoreline to transport oil and gas. The pipelines would connect with onshore facilities and the Trans Alaska Pipeline System (TAPS). In response to BPXA's submittal of a permit application under Section 10 of the Rivers and Harbors Act, Section 404 of the Clean Water Act, and Section 103 of the Marine Protection Research and Sanctuaries Act, the US Army Corps of engineers, Alaska District (Corps) determined that issuance of a permit for BPXA's proposed project constituted a major federal action that may significantly affect the quality of the human environment pursuant to the National Environmental Policy Act (NEPA). In addition, the US Environmental Protection Agency (EPA), determined under provisions of the Clean Water Act and 40 CFR Part 6 Subpart F that permitting by the EPA for BPXA's proposed project also constituted a major federal action that my significantly affect the quality of the human environment. As a result, preparation of an Environmental Impact Statement (EIS) under NEPA was undertaken to identify and evaluate a range of reasonable alternatives and evaluate the potential effects the alternates, including BPXA's proposed project, may have on the human environment

  20. The UKC2 regional coupled environmental prediction system

    Science.gov (United States)

    Lewis, Huw W.; Castillo Sanchez, Juan Manuel; Graham, Jennifer; Saulter, Andrew; Bornemann, Jorge; Arnold, Alex; Fallmann, Joachim; Harris, Chris; Pearson, David; Ramsdale, Steven; Martínez-de la Torre, Alberto; Bricheno, Lucy; Blyth, Eleanor; Bell, Victoria A.; Davies, Helen; Marthews, Toby R.; O'Neill, Clare; Rumbold, Heather; O'Dea, Enda; Brereton, Ashley; Guihou, Karen; Hines, Adrian; Butenschon, Momme; Dadson, Simon J.; Palmer, Tamzin; Holt, Jason; Reynard, Nick; Best, Martin; Edwards, John; Siddorn, John

    2018-01-01

    It is hypothesized that more accurate prediction and warning of natural hazards, such as of the impacts of severe weather mediated through various components of the environment, require a more integrated Earth System approach to forecasting. This hypothesis can be explored using regional coupled prediction systems, in which the known interactions and feedbacks between different physical and biogeochemical components of the environment across sky, sea and land can be simulated. Such systems are becoming increasingly common research tools. This paper describes the development of the UKC2 regional coupled research system, which has been delivered under the UK Environmental Prediction Prototype project. This provides the first implementation of an atmosphere-land-ocean-wave modelling system focussed on the United Kingdom and surrounding seas at km-scale resolution. The UKC2 coupled system incorporates models of the atmosphere (Met Office Unified Model), land surface with river routing (JULES), shelf-sea ocean (NEMO) and ocean waves (WAVEWATCH III). These components are coupled, via OASIS3-MCT libraries, at unprecedentedly high resolution across the UK within a north-western European regional domain. A research framework has been established to explore the representation of feedback processes in coupled and uncoupled modes, providing a new research tool for UK environmental science. This paper documents the technical design and implementation of UKC2, along with the associated evaluation framework. An analysis of new results comparing the output of the coupled UKC2 system with relevant forced control simulations for six contrasting case studies of 5-day duration is presented. Results demonstrate that performance can be achieved with the UKC2 system that is at least comparable to its component control simulations. For some cases, improvements in air temperature, sea surface temperature, wind speed, significant wave height and mean wave period highlight the potential

  1. The UKC2 regional coupled environmental prediction system

    Directory of Open Access Journals (Sweden)

    H. W. Lewis

    2018-01-01

    Full Text Available It is hypothesized that more accurate prediction and warning of natural hazards, such as of the impacts of severe weather mediated through various components of the environment, require a more integrated Earth System approach to forecasting. This hypothesis can be explored using regional coupled prediction systems, in which the known interactions and feedbacks between different physical and biogeochemical components of the environment across sky, sea and land can be simulated. Such systems are becoming increasingly common research tools. This paper describes the development of the UKC2 regional coupled research system, which has been delivered under the UK Environmental Prediction Prototype project. This provides the first implementation of an atmosphere–land–ocean–wave modelling system focussed on the United Kingdom and surrounding seas at km-scale resolution. The UKC2 coupled system incorporates models of the atmosphere (Met Office Unified Model, land surface with river routing (JULES, shelf-sea ocean (NEMO and ocean waves (WAVEWATCH III. These components are coupled, via OASIS3-MCT libraries, at unprecedentedly high resolution across the UK within a north-western European regional domain. A research framework has been established to explore the representation of feedback processes in coupled and uncoupled modes, providing a new research tool for UK environmental science. This paper documents the technical design and implementation of UKC2, along with the associated evaluation framework. An analysis of new results comparing the output of the coupled UKC2 system with relevant forced control simulations for six contrasting case studies of 5-day duration is presented. Results demonstrate that performance can be achieved with the UKC2 system that is at least comparable to its component control simulations. For some cases, improvements in air temperature, sea surface temperature, wind speed, significant wave height and mean wave period

  2. INEL Waste and Environmental Information Integration Project approach and concepts

    International Nuclear Information System (INIS)

    Dean, L.A.; Fairbourn, P.J.; Randall, V.C.; Riedesel, A.M.

    1994-06-01

    The Idaho National Engineering, Laboratory (INEL) Waste and Environmental Information integration Project (IWEIIP) was established in December 1993 to address issues related to INEL waste and environmental information including: Data quality; Data redundancy; Data accessibility; Data integration. This effort includes existing information, new development, and acquisition activities. Existing information may not be a database record; it may be an entire document (electronic, scanned, or hard-copy), a video clip, or a file cabinet of information. The IWEIIP will implement an effective integrated information framework to manage INEL waste and environmental information as an asset. This will improve data quality, resolve data redundancy, and increase data accessibility; therefore, providing more effective utilization of the dollars spent on waste and environmental information

  3. Nuclear facility projects in Finland: quality of environmental impact assessment (EIA) processes

    International Nuclear Information System (INIS)

    Vaatainen, A.

    2001-01-01

    In Finland, three public EIA hearings arranged by the contact authority concerning nuclear facilities were organised in 1999: the EIAs of two reactors planned to be constructed in Eurajoki (Olkiluoto) and in Loviisa, and the EIA of a final disposal facility of spent nuclear fuel, to be situated either in Olkiluoto, Loviisa, Romuvaara or Kivetty. Additionally, an application for a decision-in-principle concerning a final disposal facility to be constructed in Olkiluoto was submitted. The Ministry of Trade and Industry is the contact authority in all nuclear projects in Finland. Probably due to the simultaneity of the processes and the great importance of nuclear facility projects to the whole of society, the public opinions did not include only views about environmental impacts of each project, but also opposing and overall views about the use of nuclear energy and its safety. As for the final disposal project, alternative methods were introduced and opposition to the project itself was expressed instead of or in addition to the environmental impacts. (author)

  4. A questionnaire for teachers to improve training activity and students on environmental science in the frame of ENVRIPLUS project

    Science.gov (United States)

    D'Addezio, Giuliana; Marsili, Antonella; Beranzoli, Laura

    2017-04-01

    ENVRIplus is a Horizon 2020 project bringing together Environmental and Earth System Research Infrastructures, projects and networks together with technical specialist partners to create a more coherent, interdisciplinary and interoperable cluster of Environmental Research. One of the aims of this project is to disseminate knowledge on environmental topics, focusing attention on European secondary schools. We elaborated actions to design an e-Training Platform for multimedia education of secondary school level teachers and students. The purpose is to favor teacher training and consequently students training on selected scientific themes faced within the ENVRIPLUS Research Infrastructures. In particular we address major thematic research areas and challenges on Biodiversity and Ecosystem Services, Greenhouse effect and Earth Warming, Ocean acidifications and Environmental sustainability. To realize the training platform we start detailed study and analysis of teaching and multimedia information materials already available. We plan the realization of an appealing and usable portal/digital repository, to stimulate learning of STEM topics and which also includes opportunities to develop original content. To better project the actions and to catch teacher needs, we prepare a questionnaire that will be administered to a large sample of international school audience to collect input directly from the potential users. The first part focused on objective information about the formal, quantitative and qualitative position of science class in schools and the content and methods of teaching in different countries. The second part investigates subjective teacher experiences, views and proposals on what can improve training offer for environmental science lessons and courses.

  5. Projective-anticipating, projective and projective-lag synchronization of chaotic systems with time-varying delays

    International Nuclear Information System (INIS)

    Feng Cunfang; Guan Wei; Wang Yinghai

    2013-01-01

    We investigate different types of projective (projective-anticipating, projective and projective-lag) synchronization in unidirectionally nonlinearly coupled time-delayed chaotic systems with variable time delays. Based on the Krasovskii–Lyapunov approach, we find both the existence and sufficient stability conditions, using a general class of time-delayed chaotic systems related to optical bistable or hybrid optical bistable devices. Our method has the advantage that it requires only one nonlinearly coupled term to achieve different types of projective synchronization in time-delayed chaotic systems with variable time delays. Compared with other existing works, our result provides an easy way to achieve projective-anticipating, projective and projective-lag synchronization. Numerical simulations of the Ikeda system are given to demonstrate the validity of the proposed method. (paper)

  6. Web Based Project Management System

    OpenAIRE

    Aadamsoo, Anne-Mai

    2010-01-01

    To increase an efficiency of a product, nowadays many web development companies are using different project management systems. A company may run a number of projects at a time, and requires input from a number of individuals, or teams for a multi level development plan, whereby a good project management system is needed. Project management systems represent a rapidly growing technology in IT industry. As the number of users, who utilize project management applications continues to grow, w...

  7. 2003 Fernald Environmental Management Project Annual Illness and Injury Surveillance Report, Revised September 2007

    Energy Technology Data Exchange (ETDEWEB)

    U.S. Department of Energy, Office of Health, Safety and Security, Office of Illness and Injury Prevention Programs

    2007-10-04

    Annual Illness and Injury Surveillance Program report for 2003 for the Fernald Environmental Management Project. The U.S. Department of Energy’s (DOE) commitment to assuring the health and safety of its workers includes the conduct of epidemiologic surveillance activities that provide an early warning system for health problems among workers. The IISP monitors illnesses and health conditions that result in an absence of workdays, occupational injuries and illnesses, and disabilities and deaths among current workers.

  8. Environmental Impacts of the Production and Application of Biochar - EuroChar Project

    Science.gov (United States)

    Rack, Mireille; Woods, Jeremy

    2014-05-01

    One of the potential benefits of biochar is carbon sequestration. To determine the overall net sequestration potential it is important to analyse the full supply chain, assessing both the direct and indirect emissions associated with the production and application of biochar. However, it is essential to also incorporate additional environmental impact categories to ensure the assessment of a more complete environmental impact profile. This paper uses a full life-cycle assessment (LCA) methodology to evaluate the results from the EuroChar, 'biochar for carbon sequestration and large-scale removal of GHG from the atmosphere', project. This EU Seventh Framework Programme project aims to investigate and reduce uncertainties around the impacts of, and opportunities for, biochar, and in particular explore possible pathways for its introduction into modern agricultural systems in Europe. The LCA methodology, according to the ISO standards, is applied to the project-specific supply chains to analyse the environmental impacts of biochar production and application. Two conversion technologies for the production of biochar are assessed, gasification and hydrothermal carbonization (HTC), in order to provide conversion efficiencies and emission factors for the biochar production component of the supply chain. The selected feedstocks include those derived from waste residues and dedicated crops. For the end use stage, various forms and methods for biochar application are considered. In addition to the Global Warming Potential category, other environmental impact categories are also included in the analysis. The resulting 'feedstock * conversion technology' matrix provides nine pathways for the production and application of biochar, which are applied as a representative basis for the scenario modelling. These scenarios have been developed in order to assess the feedstock and land availability in Europe for the production and application of biochar and to give an order of

  9. Canister Cleaning System Final Design Report - Project A.2.A

    International Nuclear Information System (INIS)

    FARWICK, C.C.

    2000-01-01

    Approximately 2,300 metric tons Spent Nuclear Fuel (SNF) are currently stored within two water filled pools, the 105 K East (KE) fuel storage basin and the 105 K West (KW) fuel storage basin, at the U.S. Department of Energy, Richland Operations Office (RL). The SNF Project is responsible for operation of the K Basins and for the materials within them. A subproject to the SNF Project is the Debris Removal Subproject, which is responsible for removal of empty canisters and lids from the basins. The Canister Cleaning System (CCS) is part of the Debris Removal Project. The CCS will be installed in the KW Basin and operated during the fuel removal activity. The KW Basin has approximately 3600 canisters that require removal from the basin. The CCS is being designed to ''clean'' empty fuel canisters and lids and package them for disposal to the Environmental Restoration Disposal Facility complex. The system will interface with the KW Basin and be located in the Dummy Elevator Pit

  10. Environmental management

    NARCIS (Netherlands)

    Guicherit, R.

    1996-01-01

    Elements of a national environmental management system include: • monitoring networks to establish the prevailing environmental quality; • emission inventories, and projected emission inventories based on population growth, increase of traffic density, and economie growth; taking into account

  11. Evolution of Project-Based Learning in Small Groups in Environmental Engineering Courses

    Science.gov (United States)

    Requies, Jesús M.; Agirre, Ion; Barrio, V. Laura; Graells, Moisès

    2018-01-01

    This work presents the assessment of the development and evolution of an active methodology (Project-Based Learning--PBL) implemented on the course "Unit Operations in Environmental Engineering", within the bachelor's degree in Environmental Engineering, with the purpose of decreasing the dropout rate in this course. After the initial…

  12. Fraser Valley System Reinforcement Project: Environmental planning and assessment report

    International Nuclear Information System (INIS)

    1991-06-01

    Transmission facilities in the south central Fraser Valley, British Columbia, need reinforcement in order to meet anticipated growth in power demand. This objective could be met by reinforcing substation facilities (adding 500-kV equipment and connection to transmission line 5L41) at the McLellan Substation in Surrey, at the Clayburn Substation in Matsqui, or at the Atchelitz Substation in Chilliwack. An assessment is provided of the environmental evaluation criteria applied to these potential sites for substation reinforcement and the rationale for selection of the Clayburn site as the environmentally most effective alternative. The Clayburn site is already cleared and managed for a 230-kV substation; environmental, land use, and socioeconomic impacts are considered manageable. The existing right-of-way for the 500-kV loop in to the substation can be utilized. In addition, the results of an environmental assessment and mitigation plan for the Clayburn substation reinforcement are described. The most significant factors that will require possible mitigative measures include fisheries, water quality, floodplain management, visual and recreational aspects, and heritage resources. 16 figs., 5 tabs

  13. External communication in environmental projects; La comunicacion externa en los proyectos ambientales

    Energy Technology Data Exchange (ETDEWEB)

    Ruiz Feltrer, C.

    2004-07-01

    The public's awareness of industrial projects is constantly growing. In addition, if such project imply any sort of environmental impact, their awareness increases and may result in a series of deterrents to the start-up of the said projects. The present article focuses on one of the most powerful of management tools through, at the same time, the one most often forgotten by companies: external communication. In the first part of the article, we shall analyse the reasons why many industrial projects never actually see the light of day. Starting from three working hypotheses, we came to the conclusion that we must be proactive in our communication if we wish our development to be durable and to last. In the second part, we put forward a method for planning communication aimed at first of all, foreseeing, and, ultimately, solving situations arising from the deterrents already mentioned. We have used a classical planning model from which to develop a specific application called Environmental Communication. (Author)

  14. Environmental problem analysis of the proposed Sage Creek Coal Project in the Flathead Valley of British Columbia

    Energy Technology Data Exchange (ETDEWEB)

    1981-01-01

    The proposed Sage Creek Coal Project is analysed with respect to environmental impacts, international concerns and public concerns. Although information available to date is insufficient to pursue an analysis enabling a determination of the full social and environmental cost of the project, basic concerns and issues have been elucidated. Emphasis is given to the potential adverse effects on existing fish species and on wildlife species, particularly grizzly bear, moose and mountain goat. Because the area affected by the project includes both Canadian and U.S. territory, environmental objectives of the U.S. government for the Upper Flathead Valley ecosystem must also be considered in any future B.C. government decisions. Public opposition to the project from an environmental standpoint is documented. The report concludes the preferred option for a Ministry of Environment position is to recommend the project not proceed.

  15. Environmental Assessment and Finding of No Significant Impact: Kalina Geothermal Demonstration Project Steamboat Springs, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    N/A

    1999-02-22

    The Department of Energy (DOE) has prepared an Environmental Assessment (EA) to provide the DOE and other public agency decision makers with the environmental documentation required to take informed discretionary action on the proposed Kalina Geothermal Demonstration project. The EA assesses the potential environmental impacts and cumulative impacts, possible ways to minimize effects associated with partial funding of the proposed project, and discusses alternatives to DOE actions. The DOE will use this EA as a basis for their decision to provide financial assistance to Exergy, Inc. (Exergy), the project applicant. Based on the analysis in the EA, DOE has determined that the proposed action is not a major Federal action significantly affecting the quality of the human or physical environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an environmental impact statement is not required and DOE is issuing this Finding of No Significant Impact (FONSI).

  16. Overview of the NASA Environmentally Responsible Aviation Project's Propulsion Technology Portfolio

    Science.gov (United States)

    Suder, Kenneth L.

    2012-01-01

    The NASA Environmentally Responsible Aviation (ERA) Project is focused on developing and demonstrating integrated systems technologies to TRL 4-6 by 2020 that enable reduced fuel burn, emissions, and noise for futuristic air vehicles. The specific goals aim to simultaneously reduce fuel burn by 50%, reduce Landing and Take-off Nitrous Oxides emissions by 75% relative to the CAEP 6 guidelines, and reduce cumulative noise by 42 Decibels relative to the Stage 4 guidelines. These goals apply to the integrated vehicle and propulsion system and are based on a reference mission of 3000nm flight of a Boeing 777-200 with GE90 engines. This paper will focus primarily on the ERA propulsion technology portfolio, which consists of advanced combustion, propulsor, and core technologies to enable these integrated air vehicle systems goals. An overview of the ERA propulsion technologies will be described and the status and results to date will be presented.

  17. Environmental impact assessment system in Thailand and its comparison with those in China and Japan

    Energy Technology Data Exchange (ETDEWEB)

    Suwanteep, Kultip, E-mail: suwanteep.k.aa@m.titech.ac.jp; Murayama, Takehiko; Nishikizawa, Shigeo

    2016-04-15

    This paper aims to find ways to streamline the Environmental Impact Assessment (EIA) system in Thailand to increase its effectiveness by comparative analysis with China and Japan. This study is mainly focused on review, update and comparison of EIA systems between these three countries. It is intended to clarify fundamental information of the EIA systems and characteristics of the key elements of EIA processes (screening, consideration of alternatives, prediction or evaluation of impact, and public participation). Moreover, the number of the EIA projects that have been implemented in all the provinces in Thailand are presented. The results identified the similarities and differences of the EIA processes among the three aforementioned countries. The type of EIA report used in Thailand, unlike those in China and Japan, is an Environmental and Health Impact Assessment (EHIA), which is concerned with the health and environmental impacts that could occur from the project. In addition, EIA reports in Thailand are made available to the public online and the shortcomings of the process have details of barriers resulting from the projects to help future projects with reconsideration and improvements. In this study, it is pointed out that Thai's EIA system still lacks local EIA authority which needs to be empowered by implementing a set of laws or ordinance. - Highlights: • Reviewed current EIA procedures in Thailand, Japan and China • The EIA database is getting improved so as to generate profile of EIAs in the past. • Thailand needs to empower the local EIA authority within the EIA system. • The potential impacts should be more concerned than their scale in Japanese EIA. • Time limits and transparency should be reconsidered in China's EIA system.

  18. U-tube based near-surface environmental monitoring in the Shenhua carbon dioxide capture and storage (CCS) project.

    Science.gov (United States)

    Li, Qi; Song, Ranran; Shi, Hui; Ma, Jianli; Liu, Xuehao; Li, Xiaochun

    2018-04-01

    The CO 2 injected into deep formations during implementation of carbon dioxide (CO 2 ) capture and storage (CCS) technology may leak and migrate into shallow aquifers or ground surfaces through a variety of pathways over a long period. The leaked CO 2 can threaten shallow environments as well as human health. Therefore, almost all monitoring programs for CCS projects around the world contain near-surface monitoring. This paper presents a U-tube based near-surface monitoring technology focusing on its first application in the Shenhua CCS demonstration project, located in the Ordos Basin, Inner Mongolia, China. First, background information on the site monitoring program of the Shenhua CCS demonstration project was provided. Then, the principle of fluid sampling and the monitoring methods were summarized for the U-tube sampler system, and the monitoring data were analyzed in detail. The U-tube based monitoring results showed that the U-tube sampler system is accurate, flexible, and representative of the subsurface fluid sampling process. The monitoring indicators for the subsurface water and soil gas at the Shenhua CCS site indicate good stratification characteristics. The concentration level of each monitoring indicator decreases with increasing depth. Finally, the significance of this near-surface environmental monitoring technology for CO 2 leakage assessments was preliminarily confirmed at the Shenhua CCS site. The application potential of the U-tube based monitoring technology was also demonstrated during the subsurface environmental monitoring of other CCS projects.

  19. Planning Support Systems (PSS-Based Spatial Plan Alternatives and Environmental Assessment

    Directory of Open Access Journals (Sweden)

    Hee-Sun Choi

    2016-03-01

    Full Text Available Spatial planning is at the core of national land and urban development. Many countries and cities seek sustainable development through various means such as coordinated environmental planning, environmental assessment, and internalization of environmental analysis and planning. A Planning Support System (PSS is a GIS (Geographic Information System-based, spatial decision-making support system that incorporates a variety of theories and pertinent models. This study adopted the “What if?” model to design an alternative spatial plan that includes generation of predictive scenarios and is relatively easy to use. In the cities studied, we identified a total of six scenarios based on the main drivers of development—namely, population and spatial policies. Subsequently, we assessed the alternatives for their environmental impact, preparing sensitivity maps for each major environmental issue in the target area (natural ecosystem, air and microclimate, natural disasters. One projected advantage of the “What if?” model is that its digital visualization of proposed plans may improve public awareness and involvement. Furthermore, the tool is expected to be highly useful in ensuring the objectivity of quantitative analyses. However, it is necessary to develop a PSS that is both standardized and tailored to the particular needs of each area. Finally, the development of an e-governance system will be beneficial in ensuring public access to the decision making process.

  20. 76 FR 75554 - Notice of Availability of the Draft Environmental Impact Statement for the Mount Hope Project...

    Science.gov (United States)

    2011-12-02

    ... Environmental Impact Statement for the Mount Hope Project, Eureka County, NV AGENCY: Bureau of Land Management... Impact Statement (EIS) for the Mount Hope Project and by this notice is announcing the opening of the... Mount Hope Project Draft EIS within 90 days following the date the Environmental Protection Agency...

  1. 77 FR 62256 - Notice of Availability of the Final Environmental Impact Statement for the Mount Hope Project...

    Science.gov (United States)

    2012-10-12

    ... of the Final Environmental Impact Statement for the Mount Hope Project, Eureka County, NE AGENCY... prepared a Final Environmental Impact Statement (EIS) for the Mount Hope Project and by this notice is... Register. ADDRESSES: Copies of the Mount Hope Project Final EIS are available at the Battle Mountain...

  2. Using automated environmental management information systems to enable compliance: Ten questions to answer before selecting a software system

    Energy Technology Data Exchange (ETDEWEB)

    Gilbert, J.B.

    1999-07-01

    As technology invades the arena of environmental information management, hundreds of software packages have become available in the marketplace. How does the already overwhelmed environmental manager or IT professional decide what's right for the organization? Is there a software package that meets the needs of the organization, and is there a successful way to implement the system? Does this require abandoning existing systems with which users are comfortable? Can the system really save time and/or money? This paper discusses three topics: What drives the need for a system; Ten questions to aid in selecting a system that is right for your organization; and enabling technology and software systems available today, and the future application of technology to environmental data management. Motivating factors for EMIS include regulatory, business and IT drivers. Because of the ever-increasing regulatory burden, the need to demonstrate compliance often is the strongest driver. But they cannot ignore business and IT drivers from the discussion, especially with issues such as Enterprise Resource Planning and The Year 2000 impacting many systems projects. Before selecting a system, the organization should address, at a minimum, the following ten issues: (1) Organization objectives; (2) Organization readiness; (3) High-level processes to be automated; (4) Integration and interfaces; (5) User community and needs; (6) Technical requirements; (7) Degree of customization; (8) Project timing; (9) Implementation resource needs; and (10) System justification. Today, there are hundreds of EH and S software packages available too help automate daily business processes. Only a few are multimedia packages, and all require significant implementation efforts. The EMIS market is still evolving, and software vendors continue to enhance product features and usability.

  3. Final Project Summary Report Bechtel Nevada and Fiberchem Environmental, Inc., Cooperative Research and Technology Development Project

    Energy Technology Data Exchange (ETDEWEB)

    R. J. Pollina

    1999-04-01

    This is a report summarizing work on a small project dedicated to adapting a new chemical sensing platform for the US Department of Energy and its customers. At the same time and in the spirit of technology transfer, FCI Environmental, Inc., would receive technical support in the form of expertise from the US Department of Energy to assist in developing this product. The sensor is a hybrid integrated-circuit, optical waveguide, chemical sensor that is patented by FCI Environmental, Inc., and manufactured under license by Texas Instruments, Inc. A down-hole penetrometer probe was designed for use in hot, 60 C, hydrocarbon-saturated, saline environment at a depth of 200 feet. The probe design includes three chemical sensing, hybrid integrated-circuits with chemical reference and measurement channels, a water seal, output electronics, and a removable measurement head for replacement in the field. A hand-held chemical detector prototype--containing a hybrid integrated-circuit chemical sensor with reference channel, user alarm, and level display--was designed and constructed, and a software interface developed to operate the hand-held sensor interfaced with a laboratory data acquisition system.

  4. Final environmental impact statement Kenetech/PacifiCorp Windpower Project Carbon County, Wyoming

    International Nuclear Information System (INIS)

    1995-08-01

    The Draft and Final Environmental Impact Statements (DEIS and FEIS) assess the environmental consequences of a proposed windpower energy development in Carbon County, Wyoming. This abbreviated FEIS revises and supplements the DEIS for the project and addresses comments expressed for the DEIS. The proposed project entails the erection of approximately 1,390 wind turbine generators and associated facilities (e.g., roads, substations, distribution and communications lines) by KENETECH Windpower, Inc. A 230-kV transmission line would be built by PacifiCorp, Inc. to connect a proposed substation on Foote Creek Rim near Arlington to the Miner's substation near Hanna. The proposed project would use standard procedures as currently employed by other right-of-way projects, plus additional project-specific and site-specific mitigation measures to ensure that project impacts are minimized on all important resources. Impacts to most resources would be negligible to moderate during the life-of-project. Potentially significant impacts from the project include avian mortality; declining avian populations; threatened, endangered, candidate, and/or state sensitive species mortality and/or habitat loss; disturbance to nearby residents due to noise; changes in visual resources; disturbance of important Native American traditional sites; changes in plant community species composition due to snow redistribution; displacement of big game due to windfarm operation; and loss of sage grouse nesting habitat. The proposed project could also have numerous beneficial impacts including increased revenues generated by taxes, increased employment, and benefits derived from using a nonpolluting resource for electric power generation

  5. Environmental impact assessments of wind energy projects: An Alberta example

    International Nuclear Information System (INIS)

    Brown, W.K.

    1993-01-01

    A description is presented of the environmental impact assessment for an Alberta windfarm, summarizing the rationale, process and results of the assessment, costs involved, and recommendations made. The Pe-kun-nee windfarm was designed as a 44 turbine, 9.9 kW windfarm. The assessment included consideration of the complete range of environmental impacts of the windfarm, including reviews of impacts associated with similar developments elsewhere. From an environmental perspective, the proposed site and transmission line route were exceedingly suitable for development. No major potential impacts were identified. Most impacts that could occur, including terrain and vegetation disturbance, were associated with the construction phase of the project. A series of mitigation measures were developed to minimize each identified impact. Monitoring during the operations phase of the development was recommended to: ensure that the revegetation of disturbed areas was adequate; verify the sound level model; and document the incidence of bird strikes. Potential aesthetic impacts were addressed through a proposed interpretive project designed to educate visitors, enhance the profile of the wind-energy industry, and provide local employment. The assessment was completed within 8 months of initiation at a cost less than $200,000

  6. Environmental impact studies of projects be licensed under the Atomic Law

    International Nuclear Information System (INIS)

    Heuel-Fabianek, Burkhard; Lennartz, Reinhard

    2009-01-01

    The German Law on Environmental Impact Assessment (UVPG) defines projects to be licensed under the Atomic Law that require an environmental impact study (EIS). Since the project concepts as defined in the UVPG are often not the same as those defined in the Atomic Law (AtG), the licensing authority has to decide which project should be subjected to an EIA. Additionally, Article 37 of the EURATOM Treaty obliges every Member State to communicate certain data relating to the impact of emissions of radioactive substances to the Commission. This is independent of the EIA. A licence may only be granted by the competent authorities if an opinion has been received from the Commission pursuant to Article 37. In either case, the licensing authority is the first point of contact for the applicant if the question arises of whether a project has to be subjected to an EIA. A ''voluntary'' EIA should be regarded with caution because of the complexity of such a procedure within the licensing process requiring considerable resources of time and manpower, and the danger of a loss of credibility of the EIA. (orig.)

  7. Environmental assessment of nuclear projects in Canada - process, participation, lessons learned

    International Nuclear Information System (INIS)

    Underdown, G.A.; Brown, P.A.; Morrison, R.W.

    1995-01-01

    This paper documents public participation in decision-making for five cases of nuclear-based projects in Canada. Two cases involve the application of the Federal Environmental Assessment and Review Process (EARP), a formal, non-judicial process for public involvement in projects with a potential environmental impact. It is being applied to the development of new Uranium mines and the disposal of used nuclear fuels. The siting of radioactive waste facilities, generally unwanted by the communities, presents many difficult challenges which needs to be addressed before a project goes through the EARP process. An open, consultative, community-based approach to decision-making about siting is being applied in the three cases: Port Hope, Scarborough and Surrey. A number of lessons have been learned, the most important that there is a need to establish an acceptable process that includes 'getting the science right' on a project before attempting to find a site. The EARP, in most cases, provides a good mechanism for the sharing of information about a potential between the proponents and the public as long as there are no major unresolved contentious issues such as the unwanted siting of a waste facility in a particular community. 19 refs

  8. The no-project alternative analysis: An early product of the Tahoe Decision Support System

    Science.gov (United States)

    Halsing, David L.; Hessenflow, Mark L.; Wein, Anne

    2005-01-01

    We report on the development of a No-project alternative analysis (NPAA) or “business as usual” scenario with respect to a 20-year projection of 21 indicators of environmental and socioeconomic conditions in the Lake Tahoe Basin for the Tahoe Regional Planning Agency (TRPA). Our effort was inspired by earlier work that investigated the tradeoffs between an environmental and an economic objective. The NPAA study has implications for a longer term goal of building a Tahoe Decision Support System (TDSS) to assist the TRPA and other Basin agencies in assessing the outcomes of management strategies. The NPAA assumes no major deviations from current management practices or from recent environmental or societal trends and planned Environmental Improvement Program (EIP) projects. Quantitative “scenario generation” tools were constructed to simulate site-specific land uses, various population categories, and associated vehicle miles traveled. Projections of each indicator’s attainment status were made by building visual conceptual models of the relevant natural and social processes, extrapolating trends, and using available models, research, and expert opinion. We present results of the NPAA, projected indicator status, key factors affecting the indicators, indicator functionality, and knowledge gaps. One important result is that current management practices may slow the loss or degradation of environmental qualities but not halt or reverse it. Our analysis also predicts an increase in recreation and commuting into and within the basin, primarily in private vehicles. Private vehicles, which are a critical mechanism by which the Basin population affects the surrounding environment, are a key determinant of air-quality indicators, a source of particulate matter affecting Secchi depth, a source of noise, and a factor in recreational and scenic quality, largely owing to congestion. Key uncertainties in the NPAA include climate change, EIP project effectiveness, and

  9. Canadian Environmental Assessment Act : A comprehensive study report on the Peribonka hydroelectric power project

    International Nuclear Information System (INIS)

    2004-01-01

    This report presents the results of an environmental assessment of Hydro-Quebec's proposed project to build a new facility on the Peribonka River. The facility includes a run-of-river generating station with an installed capacity of 385 MW. The Quebec Region of the Department of Fisheries and Oceans Canada has conducted an environmental assessment of the project's effects. A summary of the project and the environment in which it will be carried out was presented along with the results of public consultations conducted by Hydro-Quebec. A summary of the main environmental effects was included along with cumulative effects and the effects caused by accidents or malfunctions that may occur. In addition, the terms and conditions of mitigation measures and follow-up programs were described and the significance of any environmental impacts were assessed. The project includes the construction of a 80 metre high dam, two dikes and one spillway upstream of the mouth of the Manouane River. The level of the reservoir would remain at close to its maximum level of 244.2 metres to optimize hydroelectric production. The power house would be integrated into the Hydro-Quebec transmission network. The main impacts of the project would result from the construction of the reservoir, the encroachment caused by associated facilities and the changes in hydrological conditions. This report outlined the current use of lands and resources for traditional purposes by Aboriginals. It also discussed the effects of natural events such as flooding, waves and climate that may cause damage to the facilities. It was determined that the project is not likely to cause significant effects on the renewable resources of the forest and the fisheries. The Department of Fisheries and Oceans, after having taking into account proposed mitigation measures, has rendered a preliminary conclusion which states that the project is not likely to have significant negative environmental effects. 29 refs., 7 tabs., 2

  10. Programmatic Environmental Impact Statement for the Uranium Mill Tailings Remedial Action Ground Water Project

    International Nuclear Information System (INIS)

    1993-09-01

    Public concern regarding the potential human health and environmental effects from uranium mill tailings led Congress to pass the Uranium Mill Tailings Radiation Control Act (UMTRCA) (Public Law 95-604) in 1978. In the UMTRCA, Congress acknowledged the potentially harmful health effects associated with uranium mill tailings at 24 abandoned uranium mill processing sites needing remedial action. Uranium processing activities at most of the 24 mill processing sites resulted in the formation of contaminated ground water beneath and, in some cases, downgradient of the sites. This contaminated ground water often has elevated levels of hazardous constituents such as uranium and nitrate. The purpose of the Ground Water Project is to protect human health and the environment by meeting EPA-proposed standards in areas where ground water has been contaminated with constituents from UMTRA Project sites. A major first step in the UMTRA Ground Water Project is the preparation of this Programmatic Environmental Impact Statement (PEIS). This document analyzes potential impacts of the alternatives, including the proposed action. These alternatives are programmatic in that they are plans for conducting the UMTRA Ground Water Project. The alternatives do not address site-specific ground water compliance. This PEIS is a planning document that will provide a framework for conducting the Ground Water Project; assess the potential programmatic and environmental impacts of conducting the UMTRA Ground Water Project; provide a method for determining the site-specific ground water compliance strategies; and provide data and information that can be used to prepare site-specific environmental impacts analyses documents more efficiently

  11. NASA Space Flight Human-System Standard Human Factors, Habitability, and Environmental Health

    Science.gov (United States)

    Holubec, Keith; Connolly, Janis

    2010-01-01

    This slide presentation reviews the history, and development of NASA-STD-3001, NASA Space Flight Human-System Standard Human Factors, Habitability, and Environmental Health, and the related Human Integration Design Handbook. Currently being developed from NASA-STD-3000, this project standard currently in review will be available in two volumes, (i.e., Volume 1 -- VCrew Health and Volume 2 -- Human Factors, Habitability, and Environmental Health) and the handbook will be both available as a pdf file and as a interactive website.

  12. Wind turbines and transmission systems for offshore wind projects in planning stage

    Energy Technology Data Exchange (ETDEWEB)

    Madariaga, Ander; Martin, Jose Luis; Martinez de Alegria, Inigo; Zamora, Inmaculada [University of the Basque Country (UPV/EHU), Bilbao (Spain). Engineering Faculty; Ceballos, Salvador [Parque Tecnologico de Bizkaia, Derio (Spain). Tecnalia Research and Innovation

    2012-07-01

    This paper reviews the current situation of the offshore wind turbines (OWTs) and the transmission systems (TSs) for offshore wind projects in the planning stage. Bearing in mind that offshore wind projects can last between seven and ten years from the first environmental studies to the commissioning, research engineers from companies and academia consider the solutions already available, but also to the new proposals expected to be ready in time for the project under consideration. Regarding the wind energy conversion systems (WECSs) installed in the OWTs, their main characteristics are reviewed considering turbines in the 4.1 to 10.0 MW range. Regarding the TSs, the current situation of point-to-point HVAC and HVDC links is presented, as well as some ideas related to future DC grids currently under study. (orig.)

  13. TECHNICAL RISK RATING OF DOE ENVIRONMENTAL PROJECTS - 9153

    International Nuclear Information System (INIS)

    Cercy, M.; Fayfich, Ronald; Schneider, Steven P.

    2008-01-01

    The U.S. Department of Energy's Office of Environmental Management (DOE-EM) was established to achieve the safe and compliant disposition of legacy wastes and facilities from defense nuclear applications. The scope of work is diverse, with projects ranging from single acquisitions to collections of projects and operations that span several decades and costs from hundreds of millions to billions US$. The need to be able to manage and understand the technical risks from the project to senior management level has been recognized as an enabler to successfully completing the mission. In 2008, DOE-EM developed the Technical Risk Rating as a new method to assist in managing technical risk based on specific criteria. The Technical Risk Rating, and the criteria used to determine the rating, provides a mechanism to foster open, meaningful communication between the Federal Project Directors and DOE-EM management concerning project technical risks. Four indicators (technical maturity, risk urgency, handling difficulty and resolution path) are used to focus attention on the issues and key aspects related to the risks. Pressing risk issues are brought to the forefront, keeping DOE-EM management informed and engaged such that they fully understand risk impact. Use of the Technical Risk Rating and criteria during reviews provides the Federal Project Directors the opportunity to openly discuss the most significant risks and assists in the management of technical risks across the portfolio of DOE-EM projects. Technical Risk Ratings can be applied to all projects in government and private industry. This paper will present the methodology and criteria for Technical Risk Ratings, and provide specific examples from DOE-EM projects

  14. Environmental management: A system approach

    Science.gov (United States)

    Petak, William J.

    1981-05-01

    This paper presents a system framework whose purpose is to improve understanding of environmental management. By analyzing the links between elements of the environmental management system, it is possible to construct a model that aids thinking systematically about the decision-making subsystem, and other subsystems, of the entire environmental management system. Through a multidisciplinary environmental approach, each of the individual subsystems is able to adapt to threats and opportunities. The fields of government, market economics, social responsibility and ecology, for example, are so complex that it is extremely difficult to develop a framework that gives full consideration to all aspects. This paper, through the application of a highly idealized system framework, attempts to show the general relationships that exist between complex system elements.

  15. Applicability of the "Frame of Reference" approach for environmental monitoring of offshore renewable energy projects.

    Science.gov (United States)

    Garel, Erwan; Rey, Cibran Camba; Ferreira, Oscar; van Koningsveld, Mark

    2014-08-01

    This paper assesses the applicability of the Frame of Reference (FoR) approach for the environmental monitoring of large-scale offshore Marine Renewable Energy (MRE) projects. The focus is on projects harvesting energy from winds, waves and currents. Environmental concerns induced by MRE projects are reported based on a classification scheme identifying stressors, receptors, effects and impacts. Although the potential effects of stressors on most receptors are identified, there are large knowledge gaps regarding the corresponding (positive and negative) impacts. In that context, the development of offshore MRE requires the implementation of fit-for-purpose monitoring activities aimed at environmental protection and knowledge development. Taking European legislation as an example, it is suggested to adopt standardized monitoring protocols for the enhanced usage and utility of environmental indicators. Towards this objective, the use of the FoR approach is advocated since it provides guidance for the definition and use of coherent set of environmental state indicators. After a description of this framework, various examples of applications are provided considering a virtual MRE project located in European waters. Finally, some conclusions and recommendations are provided for the successful implementation of the FoR approach and for future studies. Copyright © 2014 Elsevier Ltd. All rights reserved.

  16. An environmental assessment system for environmental technologies

    DEFF Research Database (Denmark)

    Clavreul, Julie; Baumeister, Hubert; Christensen, Thomas Højlund

    2014-01-01

    A new model for the environmental assessment of environmental technologies, EASETECH, has been developed. The primary aim of EASETECH is to perform life-cycle assessment (LCA) of complex systems handling heterogeneous material flows. The objectives of this paper are to describe the EASETECH...

  17. Pilot Test of a New Personal Health System Integrating Environmental and Wearable Sensors for Telemonitoring and Care of Elderly People at Home (SMARTA Project).

    Science.gov (United States)

    Pigini, Lucia; Bovi, Gabriele; Panzarino, Claudia; Gower, Valerio; Ferratini, Maurizio; Andreoni, Giuseppe; Sassi, Roberto; Rivolta, Massimo W; Ferrarin, Maurizio

    2017-01-01

    The increase in life expectancy is accompanied by a growing number of elderly subjects affected by chronic comorbidities, a health issue which also implies important socioeconomic consequences. Shifting from hospital or community dwelling care towards a home personalized healthcare paradigm would promote active aging with a better quality of life, along with a reduction in healthcare-related costs. The aim of the SMARTA project was to develop and test an innovative personal health system integrating standard sensors as well as innovative wearable and environmental sensors to allow home telemonitoring of vital parameters and detection of anomalies in daily activities, thus supporting active aging through remote healthcare. A first phase of the project consisted in the definition of the health and environmental parameters to be monitored (electrocardiography and actigraphy, blood pressure and oxygen saturation, weight, ear temperature, glycemia, home interaction monitoring - water tap, refrigerator, and dishwasher), the feedbacks for the clinicians, and the reminders for the patients. It was followed by a technical feasibility analysis leading to an iterative process of prototype development, sensor integration, and testing. Once the prototype had reached an advanced stage of development, a group of 32 volunteers - including 15 healthy adult subjects, 13 elderly people with cardiac diseases, and 4 clinical operators - was recruited to test the system in a real home setting, in order to evaluate both technical reliability and user perception of the system in terms of effectiveness, usability, acceptance, and attractiveness. The testing in a real home setting showed a good perception of the SMARTA system and its functionalities both by the patients and by the clinicians, who appreciated the user interface and the clinical governance system. The moderate system reliability of 65-70% evidenced some technical issues, mainly related to sensor integration, while the patient

  18. The environmental cost in the mining projects; El costo ambiental en los proyectos mineros

    Energy Technology Data Exchange (ETDEWEB)

    Antonio, Gaviria Rivera

    1992-07-01

    To evaluate and calculate the mining project, Environmental costs, besides the proper variables concerning the project. It is necessary to incorporate the distinct interrelations among the mining operation with the local and regional biophysics and. socio-economic environments existing in the project's area of influence.

  19. 75 FR 352 - Enloe Hydroelectric Project; Notice of Application Ready for Environmental Analysis and...

    Science.gov (United States)

    2010-01-05

    ... Hydroelectric Project; Notice of Application Ready for Environmental Analysis and Soliciting Comments... hydroelectric application has been filed with the Commission and is available for public inspection. a. Type of... Utility District No. 1 of Okanogan County. e. Name of Project: Enloe Hydroelectric Project. f. Location...

  20. Environmental Risk Evaluation System (ERES) for Offshore Wind - Mock-Up of ERES, Fiscal Year 2010 Progress Report

    Energy Technology Data Exchange (ETDEWEB)

    Anderson, Richard M.; Copping, Andrea E.; Van Cleve, Frances B.

    2010-11-01

    The Environmental Risk Evaluation System (ERES) has been created to set priorities among the environmental risks from offshore wind development. This report follows the conceptual design for ERES and shows what the system would look like, using a web interface created as part of a Knowledge Management System (KMS) for offshore wind. The KMS, called Zephyrus, and ERES for offshore wind, will be populated and made operational in a later phase of the project.

  1. A System of Integrated Indicators for Socio-Environmental Assessment and Eco-Certification in Agriculture – Ambitec-Agro

    OpenAIRE

    Rubens Caldeira Monteiro; Geraldo Stachetti Rodrigues

    2006-01-01

    The Brazilian Agricultural Research Agency (Embrapa) has proposed a “System for Environmental Impact Assessment of Agricultural Technology Innovations” (Ambitec-Agro) for the appraisal of research projects and technology innovations in the institutional context of R&D. A derived system, directed at eco-certification of rural activities (Eco-cert.Rural), has been proposed in order to extend the environmental assessment practice to rural activities. The Ambitec-Agro System comprises a set of we...

  2. Yakima fisheries project. Revised draft environmental impact statement

    International Nuclear Information System (INIS)

    1995-05-01

    BPA proposes to fund several fishery-related activities in the Yakima River Basin. These activities, known as the Yakima Fisheries Project (YFP), would be jointly managed by the State of Washington and the Yakima Indian Nation. The YFP is included in the Northwest Power Planning Council's (Council's) fish and wildlife program. The Council selected the Yakima River system for attention because fisheries resources are severely reduced from historical levels and because there is a significant potential for enhancement of these resources. BPA's proposed action is to fund (1) information gathering on the implementation of supplementation techniques and on feasibility of reintroducing coho salmon in an environment where native populations have become extinct; (2) research activities based on continuous assessment, feedback and improvement of research design and activities (adaptive management); and (3) the construction, operation, and maintenance of facilities for supplementing populations of upper Yakima spring chinook salmon. Major issues examined in the Revised Draft EIS include potential impacts of the project on genetic and ecological resources of existing fish populations, on water quality and quantity, on threatened and endangered species listed under the Endangered Species Act, and on the recreational fishery. Only minor differences in environmental consequences were found between Alternatives 1 and 2. Potentially high impacts on wild, native, and non-target fish populations under both alternatives would be mitigated through careful adherence to the adaptive management process outlined in the EIS

  3. Neural nets for the plausibility check of measured values in the integrated measurement and information system for the surveillance of environmental radioactivity (IMIS)

    International Nuclear Information System (INIS)

    Haase, G.

    2003-01-01

    Neural nets to the plausibility check of measured values in the ''integrated measurement and information system for the surveillance of environmental radioactivity, IMIS'' is a research project supported by the Federal Minister for the Environment, Nature Conservation and Nuclear Safety. A goal of this project was the automatic recognition of implausible measured values in the data base ORACLE, which measured values from surveillance of environmental radioactivity of most diverse environmental media contained. The conversion of this project [ 1 ] was realized by institut of logic, complexity and deduction systems of the university Karlsruhe under the direction of Professor Dr. Menzel, Dr. Martin Riedmueller and Martin Lauer. (orig.)

  4. Energy research information system projects report, volume 5, number 1

    Science.gov (United States)

    Johnson, J.; Schillinger, L.

    1980-07-01

    The system (ERIS) provides an inventory of the energy related programs and research activities from 1974 to the present in the states of Montana, Nebraska, North Dakota, South Dakota and Wyoming. Areas of research covered include coal, reclamation, water resources, environmental impacts, socioeconomic impacts, energy conversion, mining methodology, petroleum, natural gas, oilshale, renewable energy resources, nuclear energy, energy conservation and land use. Each project description lists title, investigator(s), research institution, sponsor, funding, time frame, location, a descriptive abstract of the research and title reports and/or publications generated by the research. All projects are indexed by location, personal names, organizations and subject keywords.

  5. PROMOVER (PROMOTE) - A participative methodology in socio-environmental project formation and management

    Energy Technology Data Exchange (ETDEWEB)

    Carvalho, Edison; Danciguer, Lucilene; Virginio, Geraldo; Del Carlo, Sylene

    2010-09-15

    We present a program's findings in socio-environmental sustainable development (PROMOVER), implemented by GAIA/Shell Brasil partnership. Benefited communities were leaders in artisanal fisher communities, governmental and non-governmental organizations within Shell influence areas, at Rio de Janeiro and Espirito Santo states, Brazil. The main objective is to improve its economic activities in sustainable way. The program consisted of formation on socio-environmental project elaboration, follow-up and seminar presentation. It was an interactive and dynamic training, in which leaders discussed the importance of social entrepreneurship, citizen organizations, and the establishment of networks aimed to sustainable development. Community leaders concluded 10 projects, one was awarded.

  6. PROMOVER (PROMOTE) - A participative methodology in socio-environmental project formation and management

    Energy Technology Data Exchange (ETDEWEB)

    Carvalho, Edison; Danciguer, Lucilene; Virginio, Geraldo; Del Carlo, Sylene

    2010-09-15

    We present a program's findings in socio-environmental sustainable development (PROMOVER), implemented by GAIA/Shell Brasil partnership. Benefited communities were leaders in artisanal fisher communities, governmental and non-governmental organizations within Shell influence areas, at Rio de Janeiro and Espirito Santo states, Brazil. The main objective is to improve its economic activities in sustainable way. The program consisted of formation on socio-environmental project elaboration, follow-up and seminar presentation. It was an interactive and dynamic training, in which leaders discussed the importance of social entrepreneurship, citizen organizations, and the establishment of networks aimed to sustainable development. Community leaders concluded 10 projects, one was awarded.

  7. System for prediction of environmental emergency dose information network system

    International Nuclear Information System (INIS)

    Misawa, Makoto; Nagamori, Fumio

    2009-01-01

    In cases when an accident happens to arise with some risk for emission of a large amount radioactivity from the nuclear facilities, the environmental emergency due to this accident should be predicted rapidly and be informed immediately. The SPEEDI network system for such purpose was completed and now operated by Nuclear Safety Technology Center (NUSTEC) commissioned to do by Ministry of Education, Culture, Sports, Science and Technology, Japan. Fujitsu has been contributing to this project by developing the principal parts of the network performance, by introducing necessary servers, and also by keeping the network in good condition, such as with construction of the system followed by continuous operation and maintenance of the system. Real-time prediction of atmospheric diffusion of radionuclides for nuclear accidents in the world is now available with experimental verification for the real-time emergency response system. Improvement of worldwide version of the SPEEDI network system, accidental discharge of radionuclides with the function of simultaneous prediction for multiple domains and its evaluation is possible. (S. Ohno)

  8. Aiding the environment: the Australian Development Agency's experience of implementing an environmental management system

    International Nuclear Information System (INIS)

    Keen, Meg; Sullivan, Marjorie

    2005-01-01

    Aid agencies, like commercial businesses, are increasingly concerned with incorporating sound environmental management into their operations. Different approaches are being used to integrate sustainability into development assistance to ensure that environmental impacts are assessed and managed. One approach being used by AusAID, the Australian aid agency, is to implement an environmental management system (EMS) across program and project areas. This paper examines how AusAID has adapted the EMS approach to suit aid agency operations, and some of the lessons from the Australian experience

  9. Draft environmental impact statement: KENETECH/PacifiCorp Windpower Project, Carbon County, Wyoming

    International Nuclear Information System (INIS)

    1995-01-01

    This Draft Environmental Impact Statement assesses the environmental consequences of a proposed windpower development project in Carbon County, between Arlington and Hanna, Wyoming. Public scoping commenced in January 1994. All issues raised during scoping and interdisciplinary team preparation of the analysis are addressed. The proposed project entails the erection of approximately 1,390 wind turbine generators and associated facilities (e.g., roads, substations, distribution and communications lines) by KENETECH Windpower, Inc. A 230-kV transmission line would be built by PacifiCorp, Inc. to connect a proposed substation on Foote Creek Rim near Arlington to the Miner's substation near Hanna. The proposed project would use standard procedures as currently employed by other right-of-way projects, plus additional project-specific and site-specific mitigation measures to ensure that project impacts are minimized on all important resources. Impacts to most resources would be negligible to moderate during the life-of-project. Potentially significant impacts resulting from the project include avian mortality; declining avian populations; threatened, endangered, candidate, and/or state sensitive species mortality and/or habitat loss; disturbance to nearby residents due to noise; changes in visual resources; disturbance of important Native American traditional sites; changes in plant community species composition due to snow redistribution; displacement of big game due to windfarm operation; and loss of sage grouse nesting habitat. The proposed project could also have numerous beneficial impacts including increased revenues generated by taxes, increased employment, and benefits derived from using a nonpolluting resource for electric power generation

  10. MANAGING THE INTERACTION OF RESOURCE DISTRIBUTION IN PROJECT MANAGEMENT OF IMPLEMENTATION AND FUNCTIONING OF EMERGENCY CALL SYSTEMS

    Directory of Open Access Journals (Sweden)

    Дмитро Сергійович КОБИЛКІН

    2016-02-01

    Full Text Available There have been proposed to use a mobile module "Resources manager" and its component model – scheme for managing the distribution of resources during the project management of implementation and functioning of System 112 in Ukraine. Are described the formalized tasks of performance the processes of managing the model – scheme at all stages of the projects life cycle. Also is developed the model – scheme interaction the blocks of the mobile module of resource management at the System 112 project. It describes the step by step interaction of blocks project management with the project data for successful project implementation and obtaining a product of the project, pointing out the environmental impact of the project on each of the project blocks. The conclusions about the expediency and efficiency of implementation of model – scheme in conditions of managing the emergency call systems at a single number were made.

  11. Columbia River System Operation Review final environmental impact statement. Appendix I: Power

    International Nuclear Information System (INIS)

    1995-11-01

    The System Operation Review (SOR) is a study and environmental compliance process being used by the three Federal agencies to analyze future operations of the system and river use issues. The goal of the SOR is to achieve a coordinated system operation strategy for the river that better meets the needs of all river users. This technical appendix addresses only the effects of alternative system operating strategies for managing the Columbia River system. This appendix discusses the work performed by the SOR Power Work Group. The Power Work Group (PWG) had several major responsibilities: first, to determine the effects of each of the various system operating strategies (SOS) on the Northwest regional power system; second, given these effects, to determine what, if any, actions are required to meet forecasted regional energy consumption; and finally, to estimate the cost for serving the forecasted regional energy consumption. The Northwest regional power system consists of Federal and non-Federal hydroelectric power projects (hydropower or hydro projects) on the main stem of the Columbia and Snake Rivers, numerous smaller hydro projects on other river reaches, and a number of thermal plants (coal, nuclear and combustion turbines)

  12. Public participation in the licensing of large-scale projects with environmental impact

    International Nuclear Information System (INIS)

    1989-01-01

    As a rule, public participation in licensing and planning procedures for large-scale projects with environmental impact is as controversial as the projects themselves. Against this background, an interdisciplinary examination of several 'cases' of public participation in administrative procedures with varying legal forms is being conducted in a joint research project run by the Department for Applied Systems Analysis (Karlsruher Nuclear Centre) and the Research Institute for Public Administration at the College for Administrative Sciences in Speyer. The actual course of events and the practical experience of the groups involved (authorities, applicants, objectors, experts) are related to the applicable legal arrangements for public participation. The question to be answered is: which expected and unexpected functions do the procedures actually fulfill and which not. Proposals for the amendment of legal policy could be developed upon the foundation of such a diagnosis. The report contains the results of the 'pilot study' on public participation in the licensing of the nuclear power plant GKN-2 in Neckarwestheim and further contributions on the issue of 'public participation', presented within the framework of a research colloquium at the School for Nuclear Technology/Karlsruhe Nuclear Research Centre. (orig.) [de

  13. FY 1999 report on the potential survey of the environmentally friendly type coal utilization system - Dispatch of engineers. A. Project for supporting the introduction of the environmentally friendly type coal utilization system (model project)/pre-survey for the potential survey; 1999 nendo kankyo chowa gata sekitan riyo system kanosei chosa. Senmomka haken A. kankyo chowa gata sekitan riyo system donyu shien jigyo (model jigyo) - Kanosei chosa no jizen chosa

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    For the purpose of the improvement of coal utilization technology and environmental preservation, the paper conducted the pre-survey of the introduction of coke oven gas desulfurization facilities in China and pre-survey of potentiality of the environmentally friendly type coal utilization system in India. The pre-survey in China was made for Anyang Steel Group Co. Ltd. and Laiwu Steel Group Co. Ltd. to judge their adaptability as site for the demonstrative project on the introduction of coke oven gas desulfurization facilities. As a result, it was confirmed that the former satisfied the conditions on Japan side such as the space for installation and prospect for fund raising. However, the amount of COG treatment was larger than that planned at Japan side, and it was found that as to the recovered sulfur, the company wanted the solid sulfur different from the fused sulfur planned at Japan side. In the survey in India, explanations were made to India of CFBC and the fluidized bed cement sintering system, bio-briquette production facilities, facilities for environmental measures, coal reforming technology, etc. At the same time, the site survey was made to examine/analyze possibilities of spread/development of Japan's CCT. (NEDO)

  14. The Environmental Trilogy project: Balancing technical, institutional, and cultural perspectives to environmental management

    International Nuclear Information System (INIS)

    Kurstedt, Pamela S.; Jim, Russell; Wadsworth, Bonnie C.W.; Burke, William H.; Kurstedt, Harold A. Jr.

    1992-01-01

    'The significant problems we face cannot be solved at the same level of thinking we were at when we created them.' Albert Einstein. I've identified an initial set of three perspectives important to building an integrated, comprehensive approach to managing the environment - technical, institutional, and cultural. I've constructed an holistic model (called the Environmental Trilogy) for environmental management, encompassing at least these three perspectives and their interrelationships. In this paper, I outline the model and report the results of a working session facilitated at Virginia Tech in Blacksburg, Virginia, in October 1991, involving three representatives from each of the technical, institutional, and cultural perspectives. The institutional members of this group were people who understand institutional effects, rather than those who represent institutions. The working group discussed and analyzed the technical-institutional, technical-cultural, and institutional-cultural inter- relationships of the environmental trilogy. The goals of the working group were to put structure on the environmental trilogy model, to facilitate the definition of variables, and explore relationships between and among variables. The working group members are to continue studying issues and components, perspectives, connections, and cause-and-effect in the models and report back to interested parties. The outcome is projected to be a more holistic, integrated view of the environment. (author)

  15. Capacity development for environmental protection : towards better performing environmental impact assessment systems in low and middle income countries

    NARCIS (Netherlands)

    Kolhoff, A.J.

    2016-01-01

    Environmental Impact Assessment (EIA) is a legal tool used to support government decisions on projects that could harm the environment. It is applied to such decisions, to study the possible environmental impacts of the proposed project and any mitigating measures necessary to minimize them. In the

  16. Managing environmental enhancement plans for individual research projects at a national primate research center.

    Science.gov (United States)

    Thom, Jinhee P; Crockett, Carolyn M

    2008-05-01

    We describe a method for managing environmental enhancement plans for individual research projects at a national primate research center where most monkeys are assigned to active research projects. The Psychological Well-being Program (PWB) at the University of Washington National Primate Research Center developed an Environmental Enhancement Plan form (EEPL) that allows PWB to quantify and track changes in enrichment allowances over time while ensuring that each animal is provided with as much enrichment as possible without compromising research. Very few projects involve restrictions on toys or perches. Some projects have restrictions on food treats and foraging, primarily involving the provision of these enrichments by research staff instead of husbandry staff. Restrictions are not considered exemptions unless they entirely prohibit an element of the University of Washington Environmental Enhancement Plan (UW EE Plan). All exemptions must be formally reviewed and approved by the institutional animal care and use committee. Most exemptions from elements of the UW EE Plan involve social housing. Between 2004 and 2006, the percentage of projects with no social contact restrictions increased by 1%, but those prohibiting any tactile social contact declined by 7%, and projects permitting tactile social contact during part of the study increased by 9%. The EEPL form has facilitated informing investigators about the enrichment their monkeys will receive if no restrictions or exemptions are requested and approved. The EEPL form also greatly enhances PWB's ability to coordinate the specific enrichment requirements of a project.

  17. WPPSS Nuclear Project No. 2: Final environmental statement (DOCKET No. 50-397)

    International Nuclear Information System (INIS)

    1981-12-01

    The proposed action is the issuance of an operating license to the Washington Public Power Supply System (WPPSS) for the startup and operation of the Washington Nuclear Project Number 2 (WNP-2) located on the Columbia River in Benton County, about 19 km (12 mi) north of Richland, Washington. The facility will employ a boiling water reactor to produce 3323 megawatts thermal (MWt). A steam turbine-generator will use this heat to provide a nominal gross electrical output of 1150 megawatts (MWe). The exhaust steam will be condensed by cooled water from six circular mechanical-draft cooling towers with water taken from and returned to the Columbia River. The information in this statement represents the second assessment of the environmental impact associated with the WNP-2 pursuant to the guidelines of the National Environmental Policy Act of 1969 (NEPA) and 10 CRF Part 51 of the Commission's Regulations. After receiving an application to construct this plant, the staff carried out a review of impacts that would occur during its construction and operation. That evaluation was issued as a Final Environmental Statement (construction phase). The construction of Unit 2 about 86% complete. The staff estimated a fuel-loading date of September 1983. In March 1977, the applicant applied for an operating license for the unit and submitted the required safety and environmental reports in support of the application. 20 figs., 19 tabs

  18. 78 FR 48713 - Notice of Availability of the Draft Environmental Impact Statement for the Ochoa Mine Project in...

    Science.gov (United States)

    2013-08-09

    ...] Notice of Availability of the Draft Environmental Impact Statement for the Ochoa Mine Project in Lea County, New Mexico AGENCY: Bureau of Land Management, Interior. ACTION: Notice of availability. SUMMARY... Draft Environmental Impact Statement (EIS) for the Ochoa Mine Project (Project) and by this notice is...

  19. The Environmental Health/Home Safety Education Project: a successful and practical U.S.-Mexico border initiative.

    Science.gov (United States)

    Forster-Cox, Susan C; Mangadu, Thenral; Jacquez, Benjamín; Fullerton, Lynne

    2010-05-01

    The Environmental Health/Home Safety Education Project (Proyecto de Salud Ambiental y Seguridad en el Hogar) has been developed in response to a wide array of severe and often preventable environmental health issues occurring in and around homes on the U.S.-Mexico border. Utilizing well-trained community members, called promotoras , homes are visited and assessed for potential environmental hazards, including home fire and food safety issues. Data analyzed from project years 2002 to 2005 shows a significant impact in knowledge levels and initial behavior change among targeted participants as it relates to fire and food safety issues. Since the initiation of the project in 1999, hundreds of participants have improved their quality of life by making their homes safer. The project has proven to be sustainable, replicable, flexible, and attractive to funders.

  20. Calibration of a PIXE system for analysis of environmental aerosols

    International Nuclear Information System (INIS)

    Aldape, F.; Diaz, R.V.; Anguiano, G.; Flores M, J.

    1991-04-01

    The results of the calibration of the PIXE system for analysis of environmental aerosols in the CNM is presented. The system was calibrated in order to lead to the project study of environmental aerosols using PIXE from the qualitative dimension to the quantitative one. Part of this work it was carried out in collaboration with the expert of the IAEA Dr. D. Crumpton. The calibration of the system it was achieved bombarding thin targets of well-known composition with protons of 2.5 MeV. Using this technique it was determined the absolute elementary concentration in samples of atmospheric aerosols. As an example the calculation of the lead concentration in one of them whose result was of 662 ± 49 ng m -3 is presented. This value agrees with the measurements made in the Crocker Nuclear Lab of the UCD. Its are also discussed the reproducibility and precision of the used technique. (Author)

  1. Sierra Pacific Power Company Alturas Transmission Line Project, Final Environmental Impact Report/Environmental Impact Statement. Volume 2: Comments and responses

    International Nuclear Information System (INIS)

    1995-11-01

    Sierra Pacific Power Company has proposed the construction and operation of a 345,000 volt overhead electric power transmission line from Alturas, California to Reno, Nevada. This Environmental Impact Report/Environmental Impact Statement will assess the potential environmental impacts of the proposed project and alternatives. This report contains public comments which were received on the Draft EIR/S. Significant issues may be identified through public and agency comments

  2. Decision management for the Hanford Environmental Dose Reconstruction Project

    Energy Technology Data Exchange (ETDEWEB)

    Roberds, W.J.; Haerer, H.A. [Golder Associates, Inc., Redmond, WA (United States); Winterfeldt, D.V. [Decision Insights, Laguna Beach, CA (United States)

    1992-04-01

    The Hanford Environmental Dose Reconstruction (HEDR) Project is in the process of developing estimates for the radiation doses that individuals and population groups may have received as a result of past activities at the Hanford Reservation in Eastern Washington. A formal decision-aiding methodology has been developed to assist the HEDR Project in making significant and defensible decisions regarding how this study will be conducted. These decisions relate primarily to policy (e.g., the appropriate level of public participation in the study) and specific technical aspects (e.g., the appropriate domain and depth of the study), and may have significant consequences with respect to technical results, costs, and public acceptability.

  3. Decision management for the Hanford Environmental Dose Reconstruction Project

    International Nuclear Information System (INIS)

    Roberds, W.J.; Haerer, H.A.; Winterfeldt, D.V.

    1992-04-01

    The Hanford Environmental Dose Reconstruction (HEDR) Project is in the process of developing estimates for the radiation doses that individuals and population groups may have received as a result of past activities at the Hanford Reservation in Eastern Washington. A formal decision-aiding methodology has been developed to assist the HEDR Project in making significant and defensible decisions regarding how this study will be conducted. These decisions relate primarily to policy (e.g., the appropriate level of public participation in the study) and specific technical aspects (e.g., the appropriate domain and depth of the study), and may have significant consequences with respect to technical results, costs, and public acceptability

  4. National Unmanned Aircraft Systems Project Office

    Science.gov (United States)

    Goplen, Susan E.; Sloan, Jeff L.

    2015-01-01

    The U.S. Geological Survey (USGS) National Unmanned Aircraft Systems (UAS) Project Office leads the implementation of UAS technology in the Department of the Interior (DOI). Our mission is to support the transition of UAS into DOI as a new cost-effective tool for collecting remote-sensing data to monitor environmental conditions, respond to natural hazards, recognize the consequences and benefits of land and climate change and conduct wildlife inventories. The USGS is teaming with all DOI agencies and academia as well as local, State, and Tribal governments with guidance from the Federal Aviation Administration and the DOI Office of Aviation Services (OAS) to lead the safe, efficient, costeffective and leading-edge adoption of UAS technology into the scientific research and operational activities of the DOI.

  5. Communication tools for the Hanford Environmental Dose Reconstruction Project

    International Nuclear Information System (INIS)

    Blazek, Mary Lou; Power, Max S.

    1992-01-01

    From 1944 to 1989, the U.S. Department of Energy produced plutonium at the Hanford Site in southeast Washington State. In the early days of operation, large amounts of radioactive materials were released to the environment. Documents about the releases were made public in 1986. The Hanford Environmental Dose Reconstruction Project began in 1987. The Project will determine how much radioactive material was released, how that material may have exposed people, and what radiation doses people may have received. The Project will be complete in 1995. The federal government pays for the work. The scientific work on the study is done by Battelle's Pacific Northwest Laboratory. Public credibility and valid science are equally important to those directing the dose reconstruction work. A number of tools are used to inform the public and encourage public participation. These tools are examined in this paper. (author)

  6. Environmental benefits from energy efficiency - a study of environmental aspects of EPC-projects; Miljoenytta med energieffektivisering - en studie av miljoeaspektens roll i EPC-projekt

    Energy Technology Data Exchange (ETDEWEB)

    Axelsson, Ulrik; Gottberg, Annika; Gode, Jenny; Saernholm, Erik

    2010-05-15

    Energy Performance Contracting (EPC) is an energy service which means that investments in energy saving measures are financed by means of guarantied energy savings. Since the measures are financed by estimated savings, an overall perspective on the energy performance, operating costs and indoor climate of a building or a whole building complex becomes possible. EPC thereby provides a possibility to more far-reaching energy saving measures which would otherwise not be tolerated within the operating budget. The environmental benefit such as reduced climate impact, can in some cases even be the overall objective and energy saving a way to achieve that objective. This study has investigated four EPC projects performed by public organisations in Sweden. The aim has been to analyse to what extent environmental benefit is a decision parameter in the EPC process and to develop a method and a calculating tool that make it possible for different EPC suppliers to use a common method to show the environmental benefit of the energy saving measure. Our main conclusion from this study is that the environmental issue is an important part of a EPC project but it can not be considered to be a well-functioning decision parameter. Today other parameters such as maintenance needs, modernisation, indoor climate and cost savings are the most important at the early stage for the employee of the public organisation. However, the environmental benefit could be highlighted already at this stage to show that those other advantages can be achieved with higher or lower environmental benefit, and to make sure that the political environmental benefit becomes a more important factor in the procurement process (after a political decision). An experience from the study is that for the environmental issue to play a mayor role in the realisation of an EPC project it must be involved already before the decision to perform an EPC project. This is true specially if the supplier are expected to optimise

  7. Preliminary final programmatic environmental impact statement for the Uranium Mill Tailings Remedial Action Ground Water Project. Volume 1

    International Nuclear Information System (INIS)

    1996-01-01

    The first step in the UMTRA Ground Water Project is the preparation of this programmatic environmental impact statement (PEIS). This document analyzes the potential impacts of four alternative systems for conducting the ground water program. One of these systems is the proposed action. These alternatives do not address site-specific ground water compliance strategies, because the PEIS is a planning document only. It assesses the potential programmatic impacts of conducting the Ground Water Project, provides a method for determining the site-specific ground water compliance strategies, and provides data and information that can be used to prepare site-specific environmental impacts analyses more efficiently. This PEIS presents multiple ground water compliance strategies, each with its own set of potential impacts, that could be used to implement all the alternatives presented in the PEIS except the no action alternative. The no action alternative must be considered by law. It consists of taking no action to meet EPA standards. Implementing all PEIS alternatives (except no action) means applying a ground water compliance strategy or a combination of strategies that would result in site-specific impacts

  8. Environmental management system

    International Nuclear Information System (INIS)

    2004-01-01

    An Environmental Management System was implemented in ANAV in 1999, including the two nuclear sites of the Asco and Vandellos II nuclear power plants. This implementation entailed formulation of the ANAV Environmental Policy, preparation of an Environmental Management Plan (PLAGMA) supported by the Environmental Aspects Manuals (MASMA) of each site and their operating procedures, modification of the organizational structure to create the Environment Unit, in charge of implementing the SIGEMA, and the Environment Committee, the governing body that reviews the results obtained and environmental goals to be achieved, and direct involvement of all the different ANAV organization in continuous improvement of the SIGEMA implementation. Special attention is paid to evolution of the environmental indicators, to communication and specific training in environmental issues, and to waste management and the different programs for increasing waste recycling and assessment, as well as to minimization programs. The article details the different approaches used to improve the environmental results in these last five years, which have allowed ANAV to maintain the ISO-14001 Certification since 1999. (Author)

  9. National Polar-orbiting Operational Environmental Satellite System (NPOESS) Design and Architecture

    Science.gov (United States)

    Hinnant, F.

    2008-12-01

    The National Oceanic and Atmospheric Administration (NOAA), Department of Defense (DoD), and National Aeronautics and Space Administration (NASA) are jointly acquiring the next-generation weather and environmental satellite system - the National Polar-orbiting Operational Environmental Satellite System (NPOESS). NPOESS will replace the current Polar-orbiting Operational Environmental Satellites (POES) managed by NOAA and the Defense Meteorological Satellite Program (DMSP) managed by the DoD and will provide continuity for the NASA Earth Observing System (EOS) with the launch of the NPOESS Preparatory Project (NPP). This poster will provide an overview of the NPOESS architecture, which includes four segments. The space segment includes satellites in two orbits that carry a suite of sensors to collect meteorological, oceanographic, climatological, and solar-geophysical observations of the Earth, atmosphere, and near-Earth space environment. The NPOESS design allows centralized mission management and delivers high quality environmental products to military, civil and scientific users through a Command, Control, and Communication Segment (C3S). The data processing for NPOESS is accomplished through an Interface Data Processing Segment (IDPS)/Field Terminal Segment (FTS) that processes NPOESS satellite data to provide environmental data products to NOAA and DoD processing centers operated by the United States government as well as to remote terminal users. The Launch Support Segment completes the four segments that make up NPOESS that will enhance the connectivity between research and operations and provide critical operational and scientific environmental measurements to military, civil, and scientific users until 2026.

  10. Earth System Science Project

    Science.gov (United States)

    Rutherford, Sandra; Coffman, Margaret

    2004-01-01

    For several decades, science teachers have used bottles for classroom projects designed to teach students about biology. Bottle projects do not have to just focus on biology, however. These projects can also be used to engage students in Earth science topics. This article describes the Earth System Science Project, which was adapted and developed…

  11. Environmentally-adapted local energy systems

    Energy Technology Data Exchange (ETDEWEB)

    Moe, N; Oefverholm, E [NUTEK, Stockholm (Sweden); Andersson, Owe [EKAN Gruppen (Sweden); Froste, H [Swedish Environmental Protection Agency, Stockholm (Sweden)

    1997-10-01

    Energy companies, municipalities, property companies, firms of consultants, environmental groups and individuals are examples of players working locally to shape environmentally adapted energy systems. These players have needed information making them better able to make decisions on cost-efficient, environmentally-adapted energy systems. This book answers many of the questions they have put. The volume is mainly based on Swedish handbooks produced by the Swedish National Board for Industrial and Technical Development, NUTEK, together with the Swedish Environmental Protection Agency. These handbooks have been used in conjunction with municipal energy planning, local Agenda 21 work, to provide a basis for deciding on concrete local energy systems. The contents in brief: -The book throws new light on the concept of energy efficiency; -A section on the environment compares how air-polluting emissions vary with different methods of energy production; -A section contains more than 40 ideas for measures which can be profitable, reduce energy consumption and the impact on the environment all at the same time; -The book gives concrete examples of new, alternative and environmentally-adapted local energy systems. More efficient use of energy is included as a possible change of energy system; -The greatest emphasis is laid upon alternative energy systems for heating. It may be heating in a house, block of flats, office building or school; -Finally, there are examples of environmentally-adapted local energy planning.

  12. Ranking environmental projects model based on multicriteria decision-making and the weight sensitivity analysis

    Institute of Scientific and Technical Information of China (English)

    2007-01-01

    With the fast growth of Chinese economic,more and more capital will be invested in environmental projects.How to select the environmental investment projects(alternatives)for obtaining the best environmental quality and economic benefits is an important problem for the decision makers.The purpose of this paper is to develop a decision-making model to rank a finite number of alternatives with several and sometimes conflicting criteria.A model for ranking the projects of municipal sewage treatment plants is proposed by using exports' information and the data of the real projects.And,the ranking result is given based on the PROMETHEE method. Furthermore,by means of the concept of the weight stability intervals(WSI),the sensitivity of the ranking results to the size of criteria values and the change of weights value of criteria are discussed.The result shows that some criteria,such as"proportion of benefit to projoct cost",will influence the ranking result of alternatives very strong while others not.The influence are not only from the value of criterion but also from the changing the weight of criterion.So,some criteria such as"proportion of benefit to projoct cost" are key critera for ranking the projects. Decision makers must be cautious to them.

  13. Environmental information systems - practicable decision aids

    International Nuclear Information System (INIS)

    1988-01-01

    Environmental information systems are classified in documentation systems and environmental planning systems. In environmental information systems emphasis is laid on scientific documentation. Environmental planning systems, on the other hand, involve facts on the state of the environment with respect to the air, noise, water, soil, waste management, the ecology and nature conservation. They can be used as instruments for documenting trends in enviromental pollution and the state of the art in environmental engineering. The relation polluter-environment-enforcement plays a central role for the protection of the environment (integration in terms of the KMSYS). The 'trade and process-specific emissions' system already represents an instrument for the transfer of knowledge in the field of air pollution abatement (see, e.g., Clean Air Technical Code, and the backfitting of existing plants). (DG) [de

  14. BPA/Puget Power Northwest Washington Transmission Project. Supplemental Draft Environmental Impact Statement

    International Nuclear Information System (INIS)

    1995-04-01

    Bonneville Power Administration and Puget Sound Power ampersand Light Company propose to upgrade the existing high-voltage transmission system in the Whatcom and Skagit County area between the towns of Custer and Sedro Woolley, including within the City of Bellingham, starting in 1995. The upgrades of the interconnected 230-kV and 115-kV systems are needed to increase the import capacity on a nearby U.S.-Canada 500-kV intertie by about 850 megawatts (MW). BPA and Puget Power would share the increase in north-south transfer capability. An existing BPA 230-kV single-circuit, wood-pole H-frame transmission line would be upgraded to a 230-kV lattice-steel double-circuit line. A Draft Environmental Impact Statement (DEIS) for the project was issued in November 1993. New 1994 studies showed that other improvements to Puget Power's system, and the addition of local generation has lessened local reliability problems. Also in 1994, BPA reevaluated all existing projects with this goal in mind. BPA and Puget determined that benefits would still result from this project, and that additional transfer capacity and improved system integrity warrant the expenditures. Given the changes in need, BPA decided to issue a Supplemental DEIS, and provide a second public review-and-comment period. The proposed action is designated Option 1. Impacts would be low to moderate and localized. Effects on soils and water resources in sensitive areas would be low to moderate; there would be little increase in magnetic fields, noise levels would approximate existing levels; and land use and property value impacts would be low. Threatened and endangered species would not be adversely affected, and all proposed Sections in wetlands would be covered by Nationwide Permit. Visual and socioeconomic impacts would be low to moderate. No cultural resources listed on the National Register of Historic Places would be affected

  15. A team leadership approach to managing the transition from construction to operations for an environmental project

    International Nuclear Information System (INIS)

    Kelly, J.W.

    1994-06-01

    This presentation describes a team approach, at the totalproject level that focused team members with common objectives, for the transition to start-up and operation of the project. The Integrated Management Team (IMT) approach has been successful for this US Department of Energy (DOE) environmental restoration project at the Hanford Site in Richland, Washington. The $53.8-million project will collect, treat, and dispose of low-level mixed waste water discharges from the Hanford Site. Construction is scheduled for completion in September 1994 and facility start-up in June 1995. The project challenge is for leadership that is committed to the transition from construction to operation of the environmental restoration project

  16. Environmental management & audit 2: Management systems

    OpenAIRE

    2018-01-01

    The present scientific monograph, entitled “Environmental management & audit“, is the result of three years’ work on an international project entitled “Environmental management in Russian companies – retraining courses for the sensibilization for and integration of Eco-Audit programs in corporate decision-making (RECOAUD)”. Within its more than 600 pages, the monograph features interesting texts written by 31 authors from the European Union and the Russian Federation, edited by dr. Borut Jere...

  17. PERCEPTION OF SOCIO-ENVIRONMENTAL CONFLICTS IN MINING AREAS: THE CASE OF THE MIRADOR PROJECT IN ECUADOR

    OpenAIRE

    SÁNCHEZ-VÁZQUEZ,LUIS; ESPINOSA,MARÍA GABRIELA; EGUIGUREN,MARÍA BEATRIZ

    2016-01-01

    Abstract In order to analyse the socio-environmental conflicts it is essential to pay attention to people's perception, because environmental problems can lead to different forms of conflict according to local economic and socio-cultural context. The main objective of this research is to determine the perception of the public about the different socio-environmental conflicts in the area of influence of the Mirador Project, the first project of large-scale mining in Ecuador. To do so, a repres...

  18. The UN System for Environmental-Economic Accounts for Water (SEEA-W and groundwater management: the experience of the Arno River Basin Authority within the PAWA project

    Directory of Open Access Journals (Sweden)

    Bernardo Mazzanti

    2014-09-01

    Full Text Available The Pilot Arno Water Accounts (PAWA project was recently funded under the Call “Preparatory Action on Development of Prevention Activities to Halt Desertification in Europe” of the Directorate- General for the Environment of the European Commission to promote preventive actions to manage water scarcity and drought phenomena and to meet one of the main goals under European environmental legislation: the effective and sustainable management of water resources. The partners involved in the implementation of the PAWA project (ISPRA, Arno River Basin Authority, SEMIDE/EMWIS will carry out a pilot initiative in the Arno River Basin, an area severely affected by water scarcity and droughts phenomena and characterized by water withdrawals and land use changes. In the area a large experience about water balance application was already performed, for example in the context of the Water Framework Directive Common Implementation Strategy. Moving from this knowledge, the objective of the project is the definition of water accounting processing based on the UN System of Environmental Economic Accounts for Water, with the final goal to optimize a list of effective measures to face water scarcity phenomena. By the end of project (March 2015 the PAWA partnership aims at preparing physical water stock accounts, using the best available data resulting from field measurements or models, on a monthly step for the period 1999–201. The quality of each dataset will be assessed; tables, maps and graphs will be produced as outputs of the projects in cooperation with local stakeholders and players of the water sector. Furthermore, water accounts will be used to assess the potential impact of various measures related to water resource efficient exploitation in the most vulnerable sub-basins; their tolerability will be tested during workshops with stakeholders. Finally, water efficiency targets for potential future integration into Arno River Basin Management Plan

  19. Linked environmental data. The next step for environmental information systems

    International Nuclear Information System (INIS)

    Menger, Matthias; Ackermann, Patrick; Linse, Andreas; Bandholtz, Thomas

    2013-01-01

    The Federal Environment Agency (UBA) in Germany as one Competent Authority of the European Member States involved with the assessment and authorisation of chemicals, pesticides, biozides and medicals, has a wide expertise of complex information systems. Having timely, comprehensive and reliable information on the environmental relevant properties (e.g. of chemical substances and preparations) is of immense importance for all sections dealing with environmental protection issues. Regarding the reality of available information systems in each environmental section, and moreover in each section itself, there has been developed several specific approaches to gather, store and search its relevant data. This makes sense due to each section has its own requirements, different user groups (industry and authorities or just authorities or scientific partners etc.), different budgets to bring technology 'on the road', and different (legally obligatory) procedures to handle the data and information of such systems. Nevertheless, there several strong reasons to look for a Linked Environmental Data infrastructure - at least internally in one authority itself: - Overcome the mostly separated systems; - Explore the potential of data silos in several environmental sections; - Efficiency/effectiveness in data gathering, assessment, results, budgets..; - sharing of knowledge, i.e. use of specific prepared information of specially intended information systems; - timelyness of data/information; - best data/information from most competent partner/section; - gain from already available systems and their data/information; - speed up developments and availability of data/information. Of course there are also several points which might be a huge obstacle to Linked Environmental Data (LED), e.g. confidential business data. This leads already to the distinction between 'Open LED' and 'Non-Open LED'. Nevertheless, the potential benefits and the possibilities offered via the modern information

  20. Environmental Management Integration Project/Mixed Waste Focus Area Partnership

    International Nuclear Information System (INIS)

    Gombert, D.; Kristofferson, K.; Cole, L.

    1999-01-01

    On January 16, 1998, the Assistant Secretary for the Environmental Management (EM) Program at the Department of Energy, issued DOE-Idaho the Program Integration and Systems Engineering Guidance for Fiscal Year 1998, herein called Guidance, which directed that program integration tasks be performed for all EM program areas. This guidance directed the EM Integration team, as part of the Task 1, to develop baseline waste and material disposition maps which are owned by the site Project Baseline Summary (PBS) manager. With these baselines in place Task 2 gave direction to link Science and Technology activities to the waste and material stream supported by that technology. This linkage of EM Program needs with the OST activities supports the DOE goal of maximizing cleanup at DOE sites by 2006 and provides a defensible science and technology program. Additionally, this linkage is a valuable tool in the integration of the waste and material disposition efforts for the DOE complex

  1. 77 FR 23740 - Sears Point Wetland and Watershed Restoration Project, Sonoma County, CA; Final Environmental...

    Science.gov (United States)

    2012-04-20

    ...-FF08RSFC00] Sears Point Wetland and Watershed Restoration Project, Sonoma County, CA; Final Environmental... environmental impact report and environmental impact statement (EIR/EIS) for the Sears Point Wetland and..., while providing public access and recreational and educational opportunities compatible with ecological...

  2. Permitting plan for project W-320 tank 241-C-106 waste retrieval sluicing system (WRSS)

    International Nuclear Information System (INIS)

    Symons, G.A.

    1997-01-01

    This document describes the permitting plan for Project W-320, Tank 241-C-106 Waste Retrieval Sluicing System (WRSS). A comprehensive review of environmental regulations have indicated that several environmental reviews [e.g. National Environmental Policy Act (NEPA), State Environmental Policy Act (SEPA)], permits, and approvals are required prior to construction or operation of the facility. The environmental reviews, permits and approvals, as well the regulatory authority, potentially applicable to the Tank 241-C-106 WRSS include the following: for NEPA - U.S. Department of Energy-Headquarters: Action Description Memorandum, Environmental Assessment, Categorical Exclusion, and Environmental Impact Statement; and for SEPA - State of Washington Department of Ecology (Ecology) Determination of Nonsignificance, Mitigated Determination of Nonsignificance, Determination of Significance, and SEPA Environmental Checklist

  3. ENVIRONMENTAL PROTECTION: Information on EPA Project Grants and Use of Waiver Authority

    National Research Council Canada - National Science Library

    2001-01-01

    ...) awards grants to both public and private entities such as nonprofit organizations, colleges, and universities for a variety of environmental projects including research, education, and public outreach...

  4. 1995 annual epidemiologic surveillance report for Fernald Environmental Management Project

    International Nuclear Information System (INIS)

    1995-01-01

    The US Department of Energy's (DOE) commitment to assuring the health and safety of its workers includes the conduct of epidemiologic surveillance activities that provide an early warning system for health problems among workers. During the past several years, a number of DOE sites have participated in the Epidemiologic Surveillance Program. This program monitors illnesses and health conditions that result in an absence of five or more consecutive workdays, occupational injuries and illnesses, and disabilities and deaths among current workers. This report provides a summary of epidemiologic surveillance data collected from the Fernald Environmental Management Project (FEMP) from January 1, 1995 through December 31, 1995. The data were collected by a coordinator at FEMP and submitted to the Epidemiologic Surveillance Data Center, located at Oak Ridge Institute for Science and Education, where quality control procedures and data analyses were carried out

  5. 1995 annual epidemiologic surveillance report for Fernald Environmental Management Project

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-12-31

    The US Department of Energy's (DOE) commitment to assuring the health and safety of its workers includes the conduct of epidemiologic surveillance activities that provide an early warning system for health problems among workers. During the past several years, a number of DOE sites have participated in the Epidemiologic Surveillance Program. This program monitors illnesses and health conditions that result in an absence of five or more consecutive workdays, occupational injuries and illnesses, and disabilities and deaths among current workers. This report provides a summary of epidemiologic surveillance data collected from the Fernald Environmental Management Project (FEMP) from January 1, 1995 through December 31, 1995. The data were collected by a coordinator at FEMP and submitted to the Epidemiologic Surveillance Data Center, located at Oak Ridge Institute for Science and Education, where quality control procedures and data analyses were carried out.

  6. Quantitative analysis on the environmental impact of large-scale water transfer project on water resource area in a changing environment

    Directory of Open Access Journals (Sweden)

    D. H. Yan

    2012-08-01

    Full Text Available The interbasin long-distance water transfer project is key support for the reasonable allocation of water resources in a large-scale area, which can optimize the spatio-temporal change of water resources to secure the amount of water available. Large-scale water transfer projects have a deep influence on ecosystems; besides, global climate change causes uncertainty and additive effect of the environmental impact of water transfer projects. Therefore, how to assess the ecological and environmental impact of megaprojects in both construction and operation phases has triggered a lot of attention. The water-output area of the western route of China's South-North Water Transfer Project was taken as the study area of the present article. According to relevant evaluation principles and on the basis of background analysis, we identified the influencing factors and established the diagnostic index system. The climate-hydrology-ecology coupled simulation model was used to simulate and predict ecological and environmental responses of the water resource area in a changing environment. The emphasis of impact evaluation was placed on the reservoir construction and operation scheduling, representative river corridors and wetlands, natural reserves and the water environment below the dam sites. In the end, an overall evaluation of the comprehensive influence of the project was conducted. The research results were as follows: the environmental impacts of the western route project in the water resource area were concentrated on two aspects: the permanent destruction of vegetation during the phase of dam construction and river impoundment, and the significant influence on the hydrological situation of natural river corridor after the implementation of water extraction. The impact on local climate, vegetation ecology, typical wetlands, natural reserves and the water environment of river basins below the dam sites was small.

  7. Quantitative analysis on the environmental impact of large-scale water transfer project on water resource area in a changing environment

    Science.gov (United States)

    Yan, D. H.; Wang, H.; Li, H. H.; Wang, G.; Qin, T. L.; Wang, D. Y.; Wang, L. H.

    2012-08-01

    The interbasin long-distance water transfer project is key support for the reasonable allocation of water resources in a large-scale area, which can optimize the spatio-temporal change of water resources to secure the amount of water available. Large-scale water transfer projects have a deep influence on ecosystems; besides, global climate change causes uncertainty and additive effect of the environmental impact of water transfer projects. Therefore, how to assess the ecological and environmental impact of megaprojects in both construction and operation phases has triggered a lot of attention. The water-output area of the western route of China's South-North Water Transfer Project was taken as the study area of the present article. According to relevant evaluation principles and on the basis of background analysis, we identified the influencing factors and established the diagnostic index system. The climate-hydrology-ecology coupled simulation model was used to simulate and predict ecological and environmental responses of the water resource area in a changing environment. The emphasis of impact evaluation was placed on the reservoir construction and operation scheduling, representative river corridors and wetlands, natural reserves and the water environment below the dam sites. In the end, an overall evaluation of the comprehensive influence of the project was conducted. The research results were as follows: the environmental impacts of the western route project in the water resource area were concentrated on two aspects: the permanent destruction of vegetation during the phase of dam construction and river impoundment, and the significant influence on the hydrological situation of natural river corridor after the implementation of water extraction. The impact on local climate, vegetation ecology, typical wetlands, natural reserves and the water environment of river basins below the dam sites was small.

  8. A preliminary approach to quantifying the overall environmental risks posed by development projects during environmental impact assessment.

    Science.gov (United States)

    Nicol, Sam; Chadès, Iadine

    2017-01-01

    Environmental impact assessment (EIA) is used globally to manage the impacts of development projects on the environment, so there is an imperative to demonstrate that it can effectively identify risky projects. However, despite the widespread use of quantitative predictive risk models in areas such as toxicology, ecosystem modelling and water quality, the use of predictive risk tools to assess the overall expected environmental impacts of major construction and development proposals is comparatively rare. A risk-based approach has many potential advantages, including improved prediction and attribution of cause and effect; sensitivity analysis; continual learning; and optimal resource allocation. In this paper we investigate the feasibility of using a Bayesian belief network (BBN) to quantify the likelihood and consequence of non-compliance of new projects based on the occurrence probabilities of a set of expert-defined features. The BBN incorporates expert knowledge and continually improves its predictions based on new data as it is collected. We use simulation to explore the trade-off between the number of data points and the prediction accuracy of the BBN, and find that the BBN could predict risk with 90% accuracy using approximately 1000 data points. Although a further pilot test with real project data is required, our results suggest that a BBN is a promising method to monitor overall risks posed by development within an existing EIA process given a modest investment in data collection.

  9. Java project on periodontal diseases: periodontal bone loss in relation to environmental and systemic conditions

    NARCIS (Netherlands)

    Amaliya, A.; Laine, M.L.; Delanghe, J.R.; Loos, B.G.; van Wijk, A.J.; van der Velden, U.

    2015-01-01

    Objective To assess in a population deprived from regular dental care the relationship between alveolar bone loss (ABL) and environmental/systemic conditions. Material & Methods The study population consisted of subjects from the Purbasari tea estate on West Java, Indonesia. A full set of dental

  10. Environmental management systems and organizational change

    DEFF Research Database (Denmark)

    Jørgensen, Tine Herreborg

    2000-01-01

    and environmental management systems. The structure of the organizations has changed, the relationships with external partners have strengthened and the implementation of quality and environmental management systems has trimmed the organizations to manage and develop these areas. The organization analysis is based......The establishment of an environmental management system and its continuous improvements is a process towards a reduction of the companies' and the products' environmental impact. The organizations' ability to change is crucial in order to establish a dynamic environmental management system...... and to achieve continuous environmental improvements. The study of changes gives an insight into how organizations function, as well as their forces and barriers. This article focuses on the organizational changes that two companies have undergone from 1992 up until today in connection with their quality...

  11. Open Source Dataturbine (OSDT) Android Sensorpod in Environmental Observing Systems

    Science.gov (United States)

    Fountain, T. R.; Shin, P.; Tilak, S.; Trinh, T.; Smith, J.; Kram, S.

    2014-12-01

    The OSDT Android SensorPod is a custom-designed mobile computing platform for assembling wireless sensor networks for environmental monitoring applications. Funded by an award from the Gordon and Betty Moore Foundation, the OSDT SensorPod represents a significant technological advance in the application of mobile and cloud computing technologies to near-real-time applications in environmental science, natural resources management, and disaster response and recovery. It provides a modular architecture based on open standards and open-source software that allows system developers to align their projects with industry best practices and technology trends, while avoiding commercial vendor lock-in to expensive proprietary software and hardware systems. The integration of mobile and cloud-computing infrastructure represents a disruptive technology in the field of environmental science, since basic assumptions about technology requirements are now open to revision, e.g., the roles of special purpose data loggers and dedicated site infrastructure. The OSDT Android SensorPod was designed with these considerations in mind, and the resulting system exhibits the following characteristics - it is flexible, efficient and robust. The system was developed and tested in the three science applications: 1) a fresh water limnology deployment in Wisconsin, 2) a near coastal marine science deployment at the UCSD Scripps Pier, and 3) a terrestrial ecological deployment in the mountains of Taiwan. As part of a public education and outreach effort, a Facebook page with daily ocean pH measurements from the UCSD Scripps pier was developed. Wireless sensor networks and the virtualization of data and network services is the future of environmental science infrastructure. The OSDT Android SensorPod was designed and developed to harness these new technology developments for environmental monitoring applications.

  12. Modeling and Simulation of Multi-scale Environmental Systems with Generalized Hybrid Petri Nets

    Directory of Open Access Journals (Sweden)

    Mostafa eHerajy

    2015-07-01

    Full Text Available Predicting and studying the dynamics and properties of environmental systems necessitates the construction and simulation of mathematical models entailing different levels of complexities. Such type of computational experiments often require the combination of discrete and continuous variables as well as processes operating at different time scales. Furthermore, the iterative steps of constructing and analyzing environmental models might involve researchers with different background. Hybrid Petri nets may contribute in overcoming such challenges as they facilitate the implementation of systems integrating discrete and continuous dynamics. Additionally, the visual depiction of model components will inevitably help to bridge the gap between scientists with distinct expertise working on the same problem. Thus, modeling environmental systems with hybrid Petri nets enables the construction of complex processes while keeping the models comprehensible for researchers working on the same project with significantly divergent education path. In this paper we propose the utilization of a special class of hybrid Petri nets, Generalized Hybrid Petri Nets (GHPN, to model and simulate environmental systems exposing processes interacting at different time-scales. GHPN integrate stochastic and deterministic semantics as well as other types of special basic events. Moreover, a case study is presented to illustrate the use of GHPN in constructing and simulating multi-timescale environmental scenarios.

  13. Foundation stones for a real socio-environmental integration in projects' impact assessments

    Science.gov (United States)

    Andres Dominguez-Gomez, J.

    2015-04-01

    In the last twenty years, both the increase in academic production and the expansion of professional involvement in Environmental Impact Assessment (EIA) and Social Impact Assessment (SIA), have evidenced growing scientific and business interest in risk and impact analysis. However, this growth has not brought with it a parallel progress in addressing their main shortcomings: insufficient integration of environmental and social features into development project analyses and, in cases where the social aspects are considered, technical-methodological failings in their diagnosis and assessment. It is clear that these weaknesses carry with them substantial threats to the sustainability (social, environmental and economic) of schemes which impact on the environment, and in consequence, to the local contexts where they are carried out and to the delicate balance of the global ecosystem. This paper argue that, in a sociological context of growing complexity, four foundation-stones are required to underpin research methodologies (for both diagnosis and assessment) in the socio-environmental risks of development projects: a theoretical foundation in actor-network theory; an ethical grounding in values which are internationally recognized though not always carried through into practice; a (new) epistemological-scientific base; and a methodological foundation in social participation.

  14. 42 CFR 137.294 - What is the typical IHS environmental review process for construction projects?

    Science.gov (United States)

    2010-10-01

    ... SELF-GOVERNANCE Construction Nepa Process § 137.294 What is the typical IHS environmental review... impact on the environment, and therefore do not require environmental impact statements (EIS). Under current IHS procedures, an environmental review is performed on all construction projects. During the IHS...

  15. 76 FR 67178 - Wells Hydroelectric Project; Notice of Availability of the Final Environmental Impact Statement...

    Science.gov (United States)

    2011-10-31

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2149-152] Wells Hydroelectric Project; Notice of Availability of the Final Environmental Impact Statement for the Wells... application for license for the Wells Hydroelectric Project (FERC No. 2149), located on the Columbia River in...

  16. Computational model design specification for Phase 1 of the Hanford Environmental Dose Reconstruction Project

    Energy Technology Data Exchange (ETDEWEB)

    Napier, B.A.

    1991-07-01

    The objective of the Hanford Environmental Dose Reconstruction (HEDR) Project is to estimate the radiation dose that individuals could have received as a result of emission from nuclear operations at Hanford since their inception in 1944. The purpose of this report is to outline the basic algorithm and necessary computer calculations to be used to calculate radiation doses specific and hypothetical individuals in the vicinity of Hanford. The system design requirements, those things that must be accomplished, are defined. The system design specifications, the techniques by which those requirements are met, are outlined. Included are the basic equations, logic diagrams, and preliminary definition of the nature of each input distribution. 4 refs., 10 figs., 9 tabs.

  17. Computational model design specification for Phase 1 of the Hanford Environmental Dose Reconstruction Project

    International Nuclear Information System (INIS)

    Napier, B.A.

    1991-07-01

    The objective of the Hanford Environmental Dose Reconstruction (HEDR) Project is to estimate the radiation dose that individuals could have received as a result of emission from nuclear operations at Hanford since their inception in 1944. The purpose of this report is to outline the basic algorithm and necessary computer calculations to be used to calculate radiation doses specific and hypothetical individuals in the vicinity of Hanford. The system design requirements, those things that must be accomplished, are defined. The system design specifications, the techniques by which those requirements are met, are outlined. Included are the basic equations, logic diagrams, and preliminary definition of the nature of each input distribution. 4 refs., 10 figs., 9 tabs

  18. Valuation of the environmental impacts of the Kayraktepe dam/hydroelectric project, Turkey: An exercise in contingent valuation

    International Nuclear Information System (INIS)

    Biro, Y.E.K.

    1998-01-01

    This paper describes and evaluates the environmental impacts of the Kayraktepe Dam and Hydroelectric Power Plant in Turkey. The contingent valuation method is used to estimate the project's local environmental costs. The average local rural annual willingness to pay for the restoration of the environmental impacts of the project is found to be USD 300 person -1 . Loss of forestry and agricultural benefits from the reservoir area that will be inundated are estimated to be USD 12.66 mill. yr -1 . When the Kayraktepe Project's external costs are internalized, its benefit cost ratio falls from 1.35 to 0.84, indicating that the project is economically undesirable and the decision for its construction needs to be reconsidered 26 refs, 1 fig, 5 tabs

  19. Integrated Safety Management System Phase 1 and 2 Verification for the Environmental Restoration Contractor Volumes 1 and 2

    Energy Technology Data Exchange (ETDEWEB)

    CARTER, R.P.

    2000-04-04

    DOE Policy 450.4 mandates that safety be integrated into all aspects of the management and operations of its facilities. The goal of an institutionalized Integrated Safety Management System (ISMS) is to have a single integrated system that includes Environment, Safety, and Health requirements in the work planning and execution processes to ensure the protection of the worker, public, environment, and the federal property over the life cycle of the Environmental Restoration (ER) Project. The purpose of this Environmental Restoration Contractor (ERC) ISMS Phase MI Verification was to determine whether ISMS programs and processes were institutionalized within the ER Project, whether these programs and processes were implemented, and whether the system had promoted the development of a safety conscious work culture.

  20. 76 FR 55155 - Final Environmental Impact Statement for the Proposed Keystone XL Project

    Science.gov (United States)

    2011-09-06

    ... border of the U.S. and Canada for the transport of crude oil across the U.S./Canada international... proposed Project that is designed to transport crude oil produced from oil sands in the Western Canadian... security; environmental, cultural, and economic impacts. Before making a decision on the proposed Project...

  1. Economic evaluation of environmental impacts of open cast mining project - an approach

    International Nuclear Information System (INIS)

    Maiti, S.K.; Pathak, K.

    1998-01-01

    Economic valuation of environmental attributes are pragmatic approach to evaluating the impacts and it helps decision makers to arrive at objective decisions on the basis of cost benefit ratio. For determining the physical impact and its quantification, four evaluation methods, namely-market price method, surrogate market price, survey based and cost based approaches are generally used. The present paper reviews the importance of environmental evaluation of impacts of mining and also reviews a few suitable methodologies that could be effectively used for economic evaluation of environmental impacts in open cast mining projects. (author)

  2. Linked environmental data. The next step for environmental information systems

    Energy Technology Data Exchange (ETDEWEB)

    Menger, Matthias; Ackermann, Patrick; Linse, Andreas [Federal Environemnt Agency, Dessau (Germany); Bandholtz, Thomas [innoQ GmbH, Monheim (Germany)

    2013-07-01

    The Federal Environment Agency (UBA) in Germany as one Competent Authority of the European Member States involved with the assessment and authorisation of chemicals, pesticides, biozides and medicals, has a wide expertise of complex information systems. Having timely, comprehensive and reliable information on the environmental relevant properties (e.g. of chemical substances and preparations) is of immense importance for all sections dealing with environmental protection issues. Regarding the reality of available information systems in each environmental section, and moreover in each section itself, there has been developed several specific approaches to gather, store and search its relevant data. This makes sense due to each section has its own requirements, different user groups (industry and authorities or just authorities or scientific partners etc.), different budgets to bring technology 'on the road', and different (legally obligatory) procedures to handle the data and information of such systems. Nevertheless, there several strong reasons to look for a Linked Environmental Data infrastructure - at least internally in one authority itself: - Overcome the mostly separated systems; - Explore the potential of data silos in several environmental sections; - Efficiency/effectiveness in data gathering, assessment, results, budgets..; - sharing of knowledge, i.e. use of specific prepared information of specially intended information systems; - timelyness of data/information; - best data/information from most competent partner/section; - gain from already available systems and their data/information; - speed up developments and availability of data/information. Of course there are also several points which might be a huge obstacle to Linked Environmental Data (LED), e.g. confidential business data. This leads already to the distinction between 'Open LED' and 'Non-Open LED'. Nevertheless, the potential benefits and the possibilities

  3. Collaborative Systems Biology Projects for the Military Medical Community.

    Science.gov (United States)

    Zalatoris, Jeffrey J; Scheerer, Julia B; Lebeda, Frank J

    2017-09-01

    This pilot study was conducted to examine, for the first time, the ongoing systems biology research and development projects within the laboratories and centers of the U.S. Army Medical Research and Materiel Command (USAMRMC). The analysis has provided an understanding of the breadth of systems biology activities, resources, and collaborations across all USAMRMC subordinate laboratories. The Systems Biology Collaboration Center at USAMRMC issued a survey regarding systems biology research projects to the eight U.S.-based USAMRMC laboratories and centers in August 2016. This survey included a data call worksheet to gather self-identified project and programmatic information. The general topics focused on the investigators and their projects, on the project's research areas, on omics and other large data types being collected and stored, on the analytical or computational tools being used, and on identifying intramural (i.e., USAMRMC) and extramural collaborations. Among seven of the eight laboratories, 62 unique systems biology studies were funded and active during the final quarter of fiscal year 2016. Of 29 preselected medical Research Task Areas, 20 were associated with these studies, some of which were applicable to two or more Research Task Areas. Overall, studies were categorized among six general types of objectives: biological mechanisms of disease, risk of/susceptibility to injury or disease, innate mechanisms of healing, diagnostic and prognostic biomarkers, and host/patient responses to vaccines, and therapeutic strategies including host responses to therapies. We identified eight types of omics studies and four types of study subjects. Studies were categorized on a scale of increasing complexity from single study subject/single omics technology studies (23/62) to studies integrating results across two study subject types and two or more omics technologies (13/62). Investigators at seven USAMRMC laboratories had collaborations with systems biology experts

  4. Canby Area Service Project substation and associated transmission line. Environmental Assessment

    Energy Technology Data Exchange (ETDEWEB)

    1992-02-01

    Bonneville Power Administration (BPA) provides power to Surprise Valley Electrification Corporation (SVEC) in Modoc County, California. BPA uses PacificCorp`s substation and transmission facilities between Alturas and Canby, California to transfer power to SVEC`s Canby Substation. In the next year, SVEC expects increased industrial, agricultural, and residential electric loads on their 69-kV transmission system south of Canby. SVEC`s substation can accommodate only about 10 percent of the expected additional electric load. BPA`s proposed action is intended to meet SVEC`s increasing electric load. BPA proposes to meet SVEC`s increasing energy load by tapping into BPA`s existing BPA Malin-Warner 230-kV transmission line, and building an 7.9-mile transmission line to a new BPA substation. BPA proposes to build the new substation next to the west side of SVEC`s Canby Substation (Figure 1). This new substation will allow SVEC to move the additional power over their existing transmission or distribution lines. This report is the environmental assessment of the potential impact of the proposed project. The assessment determined that no ``environmental impact statement`` is not required.

  5. Canby Area Service Project : Substation and Associated Transmission Line : Environmental Assessment.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1992-02-01

    Bonneville Power Administration (BPA) provides power to Surprise Valley Electrification Corporation (SVEC) in Modoc County, California. BPA uses PacificCorp's substation and transmission facilities between Alturas and Canby, California to transfer power to SVEC's Canby Substation. In the next year, SVEC expects increased industrial, agricultural, and residential electric loads on their 69-kV transmission system south of Canby. SVEC's substation can accommodate only about 10 percent of the expected additional electric load. BPA's proposed action is intended to meet SVEC's increasing electric load. BPA proposes to meet SVEC's increasing energy load by tapping into BPA's existing BPA Malin-Warner 230-kV transmission line, and building an 7.9-mile transmission line to a new BPA substation. BPA proposes to build the new substation next to the west side of SVEC's Canby Substation (Figure 1). This new substation will allow SVEC to move the additional power over their existing transmission or distribution lines. This report is the environmental assessment of the potential impact of the proposed project. The assessment determined that no environmental impact statement'' is not required.

  6. Airspace Systems Program: Next Generation Air Transportation System, NextGen Systems Analysis, Integration and Evaluation Project. Version 1.0; Project Plan

    Science.gov (United States)

    Quon, Leighton

    2010-01-01

    The key objectives of the NASA ASP are to: Improve mobility, capacity efficiency and access of the airspace system. Improve collaboration, predictability, and flexibility for the airspace users. Enable accurate modeling and simulation of air transportation systems. Accommodate operations of all classes of aircraft. Maintain system safety and environmental protection. In support of these program objectives, the major goal of the NextGen-SAIE Project is to enable the transition of key capacity and efficiency improvements to the NAS. Since many aspects of the NAS are unique to specific airport or airspace environments, demand on various parts of the NAS is not expected to increase equally as system demand grows. SAIE will provide systems level analysis of the NAS characteristics, constraints, and demands such that a suite of capacity-increasing concepts and technologies for system solutions are enabled and facilitated. The technical objectives in support of this goal are the following: Integration, evaluation, and transition of more mature concepts and technologies in an environment that faithfully emulates real-world complexities. Interoperability research and analysis of ASP technologies across ATM functions is performed to facilitate integration and take ASP concepts and technologies to higher Technology Readiness Level (TRL). Analyses are conducted on the program s concepts to identify the system benefits or impacts. System level analysis is conducted to increase understanding of the characteristics and constraints of airspace system and its domains.

  7. ENVIRONMENTAL MANAGEMENT SYSTEMS CERTIFICATION

    Directory of Open Access Journals (Sweden)

    Aniko Miler-Virc

    2012-12-01

    Full Text Available ISO 14001 prescribes the requirements for a system, not environmental performance itself. Similarly, certification is of the management system itself, not environmental performance. An audit is not conducted to ascertain whether your flue gas emissions are less than X part per million nitrous oxide or that your wastewater effluent contains less that Y milligrams of bacteria per litre. Consequently, the procces of auditing the system for compliance to the standard entails checking to see that all of the necessary components of a functioning system are present and working properly.           A company can have a complete and fully functional EMS as prescribed by ISO 14001 without being certified. As certification can add to the time and expense of EMS development, it is important for you to establish, in advance, whether certification is of net benefit to you. Although most companies that develop an EMS do in fact certify, there are cases where certification does not add immediate value. Certification is not always beneficial to small and medium sized companies. Certification is not always necessary for companies with one or two large clients with environmental demands who are satisfied that you have a functional EMS (second-party declaration. Whatever decision you make, it is important to remember that just as a driver′s licence does not automatically make you a good driver, ISO 14001 certification does not automatically make your company environmentally benign or ensure that you will continually improve environmental performance. The system is only as good as the people who operate it.

  8. Environmental Analysis

    Science.gov (United States)

    1980-01-01

    Burns & McDonnell Engineering's environmental control study is assisted by NASA's Computer Software Management and Information Center's programs in environmental analyses. Company is engaged primarily in design of such facilities as electrical utilities, industrial plants, wastewater treatment systems, dams and reservoirs and aviation installations. Company also conducts environmental engineering analyses and advises clients as to the environmental considerations of a particular construction project. Company makes use of many COSMIC computer programs which have allowed substantial savings.

  9. Environmental monitoring and information systems

    International Nuclear Information System (INIS)

    Gibbert, R.

    1998-01-01

    Environmental monitoring and information systems installed by Dornier are summarized. A broad spectrum of environmental areas from air quality and water to radioactivity is covered. Nuclear power plant monitoring systems, either as remote or plant-internal monitoring systems, form an important element of the work undertaken. The systems delivered covered local, regional or national areas. The range of services provided, and hardware and software platforms are listed. (R.P.)

  10. Environmental Impact Assessment: Uri hydroelectric power project on River Jhelum in Kashmir, India

    International Nuclear Information System (INIS)

    Nyman, L.

    1995-09-01

    This report is an Initial Aquatic Environmental Impact Assessment of the Uri Hydroelectric Power Project on River Jhelum in Kashmir, India. It includes the Terms of Reference of the assessment, a discussion on biodiversity and threats to it, the environmental indicators used to monitor and predict the impacts, a description of the physical, chemical and biological prerequisites of the River Jhelum ecosystem, a description of the survey sites chosen, and an overview of the present fish and bottom fauna. Finally, there are sections on the potential impacts on biota of the Uri Project and a list of proposals for how mitigating and enhancing measures could be enforced

  11. Users' Requirements for Environmental Effects From Innovative Nuclear Energy Systems and Their Fuel Cycles

    International Nuclear Information System (INIS)

    Carreter, M.; Gray, M.; Falck, E.; Bonne, A.; Bell, M.

    2002-01-01

    The objective of the International Project on Innovative Nuclear Reactors and Fuel Cycles (INPRO) is to support the safe, sustainable, economic and proliferation resistant use of nuclear technology to meet the needs of the 21. century. The first part of the project focusses on the development of an understanding of the requirements of possible users of innovative concepts for reactors and fuel cycle applications. This paper reports progress made on the identification of user requirements as they relate to the environment and environmental protection. The user requirements being formulated are intended to limit adverse environmental effects from the different facilities involved in the nuclear fuel cycles to be well below maximum acceptable levels. To determine if the user requirements are met, it is necessary to identify those factors that are relevant to assessment of the environmental performance of innovative nuclear systems. To this effect, Environmental Impact Assessment (EIA) and the Material Flow accounting (MFA) methodologies are being appraised for the suitability for application. This paper develops and provides the rationale for the 'users' requirements' as they are currently defined. Existing Environmental Impact Assessment and Materials Flow Accounting methodologies that can be applied to determine whether or not innovative technologies conform to the User Requirements are briefly described. It is concluded that after establishing fundamental principles, it is possible to formulate sets of general and specific users' requirements against which, the potential adverse environmental effects to be expected from innovative nuclear energy systems (INES) can be assessed. The application of these users' requirements should keep the adverse environmental effects from INES's within acceptable limits. (authors)

  12. Environmental analysis of a tourist development project; Analisi ambientale per un progetto di sviluppo turistico

    Energy Technology Data Exchange (ETDEWEB)

    Forni, A; Colonna, N; Olivetti, I [ENEA, Divisione Caratterizzazione dell' Ambiente e del Territorio, Centro Ricerche Casaccia, Rome (Italy)

    2001-07-01

    Planning a sustainable development project needs the integration of two requirements: increasing quality of life and environmental protection for the territory and the local community. The relationship between tourism and environment passes through the interaction between three subjects: population, tourists and landscape. They all get advantages and disadvantages from the tourist activity. Nowadays the tourism often is satisfied through a deep exploitation of the natural features of the territory. In order to carry out a development based on the sustainability principles, environmental issues have to be incorporated in any tourist project. The paper deals with a tourist development project in the Sardinia region, in the area surrounding Cagliari. The project, named Golfo degli Angeli, will be double the anthropic presences during the tourist season. Consequently natural resources exploitation will increase: especially soil (building areas and not), water (drinking and not), energy (electric and not) and obviously the production of liquid and solid wastes, will increase too. In order to deal with a growing anthropic load, in a short period of the year, it should be taken into account the managerial and technological aspects related to the environment. This paper focuses on the environmental impact and the environmental critical elements, mainly: water purification systems, water supply, waste disposals, productive systems fulfilment of EMAS environmental conditions on industrial sites, landscape protection and the contribution the project gives to reach Kyoto's targets. In order to highlight any important environmental topic the main elements of the Italian guidelines for the Strategic Environmental Assessment (S.E.A.) have been considered. [Italian] La progettazione di un intervento di sviluppo sostenibile richiede l'integrazione di due esigenze: consentire a tutta la popolazione di fruire di un incremento della qualita' della vita e la salvaguardia delle

  13. Tracking environmental costs

    International Nuclear Information System (INIS)

    Blahutova, Z.

    2011-01-01

    Tracking Environmental Costs and Investments in SAP will provide us with a managerial tool that will help us understand better the magnitude of the financial resources we are dedicating to environmental protection activities and investments. Environmental Cost Accounting is a new project in Slovenske Elektrarne that will be particularly valuable for the Company's environmental management initiatives, such as waste monitoring, cleaner production, eco-design and environmental management systems; its launch is expected in September. (author)

  14. A preliminary approach to quantifying the overall environmental risks posed by development projects during environmental impact assessment.

    Directory of Open Access Journals (Sweden)

    Sam Nicol

    Full Text Available Environmental impact assessment (EIA is used globally to manage the impacts of development projects on the environment, so there is an imperative to demonstrate that it can effectively identify risky projects. However, despite the widespread use of quantitative predictive risk models in areas such as toxicology, ecosystem modelling and water quality, the use of predictive risk tools to assess the overall expected environmental impacts of major construction and development proposals is comparatively rare. A risk-based approach has many potential advantages, including improved prediction and attribution of cause and effect; sensitivity analysis; continual learning; and optimal resource allocation. In this paper we investigate the feasibility of using a Bayesian belief network (BBN to quantify the likelihood and consequence of non-compliance of new projects based on the occurrence probabilities of a set of expert-defined features. The BBN incorporates expert knowledge and continually improves its predictions based on new data as it is collected. We use simulation to explore the trade-off between the number of data points and the prediction accuracy of the BBN, and find that the BBN could predict risk with 90% accuracy using approximately 1000 data points. Although a further pilot test with real project data is required, our results suggest that a BBN is a promising method to monitor overall risks posed by development within an existing EIA process given a modest investment in data collection.

  15. Integrated program management for major nuclear decommissioning and environmental remediation projects - 59068

    International Nuclear Information System (INIS)

    Lehew, John

    2012-01-01

    Document available in abstract form only. Full text of publication follows: CH2M HILL Plateau Remediation Company (CH2M HILL) is the U.S. Department of Energy's (DOE) contractor responsible for the safe, environmental cleanup of the Hanford Sites Central Plateau, sections of the Columbia River Corridor and the Hanford Reach National Monument. The 586-square-mile Hanford Site is located along the Columbia River in southeastern Washington, U.S.A. A plutonium production complex, housing the largest volume of radioactive and contaminated waste in the nation, with nine nuclear reactors and associated processing facilities, Hanford played a pivotal role in the nation's defense for more than 40 years, beginning in the 1940's with the Manhattan Project. Today, under the direction of the DOE, Hanford is engaged in one of the world's largest environmental cleanup project. The Plateau Remediation Contract is a 10-year project paving the way for closure of the Hanford Site. The site through its location, climate, geology and proximity to the Columbia River in combination with the results of past nuclear operations presents a highly complex environmental remediation challenge. The complexity is not only due to the technical issues associated with decommissioning nuclear facilities, remediating soil contamination sites, dispositioning legacy waste and fuel materials and integrating these with the deep vadose zone and groundwater remediation

  16. FY 1991 project plan for the Hanford Environmental Dose Reconstruction Project, Phase 2

    International Nuclear Information System (INIS)

    1991-02-01

    Phase 1 of the Hanford Environmental Dose Reconstruction Project was designed to develop and demonstrate a method for estimating radiation doses people may have received from Hanford Site operations since 1944. The method researchers developed relied on a variety of measured and reconstructed data as input to a modular computer model that generates dose estimates and their uncertainties. As part of Phase 1, researchers used the reconstructed data and computer model to calculate preliminary dose estimates for populations in a limited geographical area and time period. Phase 2, now under way, is designed to evaluate the Phase 1 data and model and improve them to calculate more accurate and precise dose estimates. Phase 2 will also be used to obtain preliminary estimates of two categories of doses: for Native American tribes and for individuals included in the pilot phase of the Hanford Thyroid Disease Study (HTDS). TSP Directive 90-1 required HEDR staff to develop Phase 2 task plans for TSP approval. Draft task plans for Phase 2 were submitted to the TSP at the October 11--12, 1990 public meeting, and, after discussions of each activity and associated budget needs, the TSP directed HEDR staff to proceed with a slate of specific project activities for FY 1991 of Phase 2. This project plan contains detailed information about those activities. Phase 2 is expected to last 15--18 months. In mid-FY 1991, project activities and budget will be reevaluated to determine whether technical needs or priorities have changed. Separate from, but related to, this project plan, will be an integrated plan for the remainder of the project. HEDR staff will work with the TSP to map out a strategy that clearly describes ''end products'' for the project and the work necessary to complete them. This level of planning will provide a framework within which project decisions in Phases 2, 3, and 4 can be made

  17. Today's Yucca mountain project and a new concept of multi-barrier system

    International Nuclear Information System (INIS)

    Xu Guoqing

    2008-01-01

    This paper mainly deals with the current status of Yucca Mountain project and the progress in study on engineering barrier in Belgium and introduces the future plan for Yucca Mountain project, two reports on draft supplemental environmental impact statement, and the view of New York Sen. Hillary Clinton and Illinois Sen. Barack Obama during the 2008 president elections related to the building a nuclear waste repository in Nevada. In order to enhance the security of geological disposal of high-level radioactive waste, a new concept about multi-barrier system is given by Belgium and is concisely described here. (authors)

  18. Implementation Plan for the Hawaii Geothermal Project Environmental Impact Statement (DOE Review Draft:)

    Energy Technology Data Exchange (ETDEWEB)

    None

    1992-09-18

    The US Department of Energy (DOE) is preparing an Environmental Impact Statement (EIS) that identifies and evaluates the environmental impacts associated with the proposed Hawaii Geothermal Project (HGP), as defined by the State of Hawaii in its 1990 proposal to Congress (DBED 1990). The location of the proposed project is shown in Figure 1.1. The EIS is being prepared pursuant to the requirements of the National Environmental Policy Act of 1969 (NEPA), as implemented by the President's Council on Environmental Quality (CEQ) regulations (40 CFR Parts 1500-1508) and the DOE NEPA Implementing Procedures (10 CFR 1021), effective May 26, 1992. The State's proposal for the four-phase HGP consists of (1) exploration and testing of the geothermal resource beneath the slopes of the active Kilauea volcano on the Island of Hawaii (Big Island), (2) demonstration of deep-water power cable technology in the Alenuihaha Channel between the Big Island and Mau, (3) verification and characterization of the geothermal resource on the Big Island, and (4) construction and operation of commercial geothermal power production facilities on the Big Island, with overland and submarine transmission of electricity from the Big Island to Oahu and possibly other islands. DOE prepared appropriate NEPA documentation for separate federal actions related to Phase 1 and 2 research projects, which have been completed. This EIS will consider Phases 3 and 4, as well as reasonable alternatives to the HGP. Such alternatives include biomass coal, solar photovoltaic, wind energy, and construction and operation of commercial geothermal power production facilities on the Island of Hawaii (for exclusive use on the Big Island). In addition, the EIs will consider the reasonable alternatives among submarine cable technologies, geothermal extraction, production, and power generating technologies; pollution control technologies; overland and submarine power transmission routes; sites reasonably suited to

  19. Environmental assessment of the Environmental Restoration Project at Sandia National Laboratories/New Mexico

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-03-01

    Sandia National Laboratories/New Mexico (SNL/NM) is managed and operated for the U.S. Department of Energy (DOE) by Sandia Corporation, a subsidiary of the Lockheed Martin Company. SNL/NM is located on land controlled by DOE within the boundaries of Kirtland Air Force Base (KAFB) in Albuquerque, New Mexico. The major responsibilities of SNL/NM are the support of national security and energy projects. This report provides an environmental assessment of proposed remedial action activities at the solid waste management units at SNL/NM. A risk assessment of health hazards is also discussed.

  20. A System Approach to Environmental Education

    Directory of Open Access Journals (Sweden)

    Z. Kostova

    2007-09-01

    Full Text Available A system approach to environmental education (EE is developed. By making use of it the educators will be able to introduce successfully ecological principles and global environmental problems in the educational system for the development of environmental culture, consciousness and behavior. It embraces a long period of thinking, designing, experimenting and rethinking in the light of the new ideas, concerning humanity-nature relationships. The core of the system approach is represented by environmental consciousness, which is the driving force of environmentally responsible behavior. The system approach is concerned with constructing an innovative model of EE, which consists of three elements: didactical, conceptual and technological and six integrating concepts, uniting the studies of the different school subjects under the global movement for sustainable development. EE is regarded to be an essential part of the education for sustainable development (ESD.

  1. 42 CFR 137.329 - What environmental considerations must be included in the construction project agreement?

    Science.gov (United States)

    2010-10-01

    ... must be included in the construction project agreement? The construction project agreement must include..., and (d) An assurance that no action will be taken on the construction phase of the project that would... 42 Public Health 1 2010-10-01 2010-10-01 false What environmental considerations must be included...

  2. Environmental assessment for geothermal loan guarantee: South Brawley geothermal exploration project

    Energy Technology Data Exchange (ETDEWEB)

    1979-11-01

    The foregoing analysis indicates that the proposed geothermal field experiment could result in several adverse environmental effects. Such effects would lie primarily in the areas of air quality, noise, aesthetics, land use, and water consumption. However, for the most part, mitigating measures have been, or easily could be, included in project plans to reduce these adverse effects to insignificant levels. Those aspects of the project which are not completely amenable to mitigation by any reasonable means include air quality, noise, aesthetics, land use and water use.

  3. PROJECT CI-NERGY: TOWARDS AN INTEGRATED ENERGY URBAN PLANNING SYSTEM FROM A DATA MODELLING AND SYSTEM ARCHITECTURE PERSPECTIVE

    Directory of Open Access Journals (Sweden)

    G. Agugiaro

    2017-09-01

    Full Text Available Growing urbanisation, its related environmental impacts, and social inequalities in cities are challenges requiring a holistic urban planning perspective that takes into account the different aspects of sustainable development. One crucial point is to reconcile urban planning with environmental targets, which include decreasing energy demand and CO2 emissions, and increasing the share of renewable energy. Within this context, the project CI-NERGY aims to develop urban energy modelling, simulation and optimisation methods and tools to support decision making in urban planning. However, there are several barriers to the implementation of such tools, such as: fragmentation of involved disciplines, different stakeholders, multiplicity of scales in a city and extreme heterogeneity of data regarding all the processes to be addressed. Project CI-NERGY aims, among other goals, at overcoming these barriers, and focuses on two case study cities, Geneva in Switzerland and Vienna in Austria. In particular, project CI-NERGY faces several challenges starting with different cities, heterogeneous data sources and simulation tools, diverse user groups and their individual needs. This paper describes the experiences gathered during the project. After giving a brief overview of the project, the two case study cities, Geneva and Vienna, are briefly presented, and the focus shifts then on overall system architecture of the project, ranging from urban data modelling topics to the implementation of a Service-Oriented Architecture. Some of the challenges faced, the solutions found, as well some plans for future improvements are described and commented.

  4. Washington Wildlife Mitigation Projects : Final Programmatic Environmental Assessment and Finding of No Significant Impact.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration; Washington (State). Dept. of Fish and Wildlife.

    1996-08-01

    Bonneville Power Administration (BPA) proposes to fund the portion of the Washington Wildlife Mitigation Agreement (Agreement) pertaining to wildlife habitat mitigation projects to be undertaken in a cooperative effort with the Washington Department of Fish and Wildlife (WDFW). This Agreement serves to establish a monetary budget funded by BPA for projects proposed by Washington Wildlife Coalition members and approved by BPA to protect, mitigate, and improve wildlife and/or wildlife habitat within the State of Washington that has been affected by the construction of Federal dams along the Columbia River. This Environmental Assessment examines the potential environmental effects of acquiring and/or improving wildlife habitat within five different project areas. These project areas are located throughout Grant County and in parts of Okanogan, Douglas, Adams, Franklin, Kittias, Yakima, and Benton Counties. The multiple projects would involve varying combinations of five proposed site-specific activities (habitat improvement, operation and maintenance, monitoring and evaluation, access and recreation management, and cultural resource management). All required Federal, State, and tribal coordination, permits and/or approvals would be obtained prior to ground-disturbing activities.

  5. Washington wildlife mitigation projects. Final programmatic environmental assessment and finding of no significant impact

    International Nuclear Information System (INIS)

    1996-08-01

    Bonneville Power Administration (BPA) proposes to fund the portion of the Washington Wildlife Mitigation Agreement (Agreement) pertaining to wildlife habitat mitigation projects to be undertaken in a cooperative effort with the Washington Department of Fish and Wildlife (WDFW). This Agreement serves to establish a monetary budget funded by BPA for projects proposed by Washington Wildlife Coalition members and approved by BPA to protect, mitigate, and improve wildlife and/or wildlife habitat within the State of Washington that has been affected by the construction of Federal dams along the Columbia River. This Environmental Assessment examines the potential environmental effects of acquiring and/or improving wildlife habitat within five different project areas. These project areas are located throughout Grant County and in parts of Okanogan, Douglas, Adams, Franklin, Kittias, Yakima, and Benton Counties. The multiple projects would involve varying combinations of five proposed site-specific activities (habitat improvement, operation and maintenance, monitoring and evaluation, access and recreation management, and cultural resource management). All required Federal, State, and tribal coordination, permits and/or approvals would be obtained prior to ground-disturbing activities

  6. Signage and wayfinding design a complete guide to creating environmental graphic design systems

    CERN Document Server

    Calori, Chris

    2015-01-01

    A new edition of the market-leading guide to signage and wayfinding design This new edition of Signage and Wayfinding Design: A Complete Guide to Creating Environmental Graphic Design Systems has been fully updated to offer you the latest, most comprehensive coverage of the environmental design process-from research and design development to project execution. Utilizing a cross-disciplinary approach that makes the information relevant to architects, interior designers, landscape architects, graphic designers, and industrial engineers alike, the book arms you with the skills needed to apply a

  7. Stakeholder participation within the public environmental system in Chile: major gaps between theory and practice.

    Science.gov (United States)

    Lostarnau, Carla; Oyarzún, Jorge; Maturana, Hugo; Soto, Guido; Señoret, Michelle; Soto, Manuel; Rötting, Tobias S; Amezaga, Jaime M; Oyarzún, Ricardo

    2011-10-01

    The main objective of this paper is to present a critical analysis of the stakeholder participation process within the Environmental Impact Assessment System in Chile, after ca. 14 years of being enforced. This analysis is sustained by the description and analysis of the stakeholder participation possibilities in a representative rural area of North-Central Chile. The Environmental Basis Act 19300, enacted in 1994, considers the participation of the local community in the environmental impact assessment of new projects. However, this possibility is very limited and difficult to exert, often resulting in frustration for the participants. This is due to a number of reasons, such as the imbalance of resources and knowledge among the majority of participating communities and project proponents, the complexity and administrative and legal constraints to participation, and the dominant interest of the Central Government in approving investments, specifically in energy and natural resources related projects, which generate wealth and jobs. Also, the State's rush to develop Internet-based communication and management systems has built a barrier for poor, traditional communities. This factor is clearly reflected in the case study considered. Results show that there is generally a significant lack of knowledge about institutions and participation tools. From this base, we intend to raise concern on these selected aspects that could be addressed to improve the effectiveness of the existing framework, both in Chile and in other developing countries, where immature environmental impact assessment and public management systems face similar pressures in relation to the sustainable use of their natural resources. Finally, some basic steps are proposed in order to make the community participation an effective tool for sustainable development. Copyright © 2011 Elsevier Ltd. All rights reserved.

  8. Draft programmatic environmental impact statement for the Uranium Mill Tailings Remedial Action Ground Water Project

    International Nuclear Information System (INIS)

    1995-04-01

    The US Department of Energy (DOE) is responsible for performing remedial action to bring surface and ground water contaminant levels at 24 inactive uranium processing sites into compliance with the US Environmental Protection Agency (EPA) standards. DOE is accomplishing this through the Uranium Mill Tailings Remedial Action (UMTRA) Surface and Ground Water Projects. Remedial action will be conducted with the concurrence of the US Nuclear Regulatory Commission (NRC) and the full participation of affected states and Indian tribes. Uranium processing activities at most of 24 the inactive mill sites resulted in the contamination of ground water beneath and, in some cases, downgradient of the sites. This contaminated ground water often has elevated levels of constituents such as uranium and nitrate. The purpose of the UMTRA Ground Water Project is to eliminate, or reduce to acceptable levels, the potential health and the environmental consequences of milling activities by meeting the EPA standards in areas where ground water has been contaminated. The first step in the UMTRA Ground Water Project is the preparation of this programmatic environmental impact statement (PEIS). This document analyzes potential impacts of four programmatic alternatives, including the proposed action. The alternatives do not address site-specific ground water compliance strategies. Rather, the PEIS is a planning document that provides a framework for conducting the Ground Water Project; assesses the potential programmatic impacts of conducting the Ground Water Project; provides a method for determining the site-specific ground water compliance strategies; and provides data and information that can be used to prepare site-specific environmental impacts analyses more efficiently

  9. Household environmental monitoring project, volume I : main report, volume 2 : appendices

    Energy Technology Data Exchange (ETDEWEB)

    Thompson, J.; Goemans, M.; Goemans, P.C.; Wisniowski, A. [Jane Thompson Architect, Ottawa, ON (Canada); Fugler, D. [Canada Mortgage and Housing Corp., Ottawa, ON (Canada)

    2006-01-15

    Environmentally sustainable behaviour can be motivated by providing homeowners with a clear picture of their environmental impact, tangible reasons for improvement, and tailored solutions. This report presented the results of a study that established a study group of 20 households in an 85-year old community near downtown Ottawa, Ontario to test the above hypothesis. Each household completed surveys about environmental attitudes and household practices. Each household also tracked home heating, electricity and water consumption, and vehicle usage and waste generation over a monitoring period of one week. This report described the study in detail and presented the research plan and methods. It provided a review of related literature, including motivational techniques for encouraging sustainable behaviour; environmental monitoring tools including design tools, global impact assessment tools, federal environmental reduction tools and strategies; analyses of environmentally sustainable projects; and resource conservation techniques and manuals. The report also discussed the selection of the study group; development of monitoring method and forms; household monitoring; household assessment and reporting; community initiatives; and assessment of following year results. It was concluded that the research technique successfully produced reductions in environmental impact among the study group. refs., tabs., figs.

  10. Analysis model for the physical dimension in the environmental studies of electric transmission projects

    International Nuclear Information System (INIS)

    Garcia Gomez; Maria Aleyda; Caballero Acosta, Humberto

    2001-01-01

    This study makes a description and analysis of the physical aspects of the environment, which are contemplated, in the environmental studies of the projects of high voltage for electric transmission lines. Its meaning and out reach are defined in this projects, in its different phases of implementation; that is in the stages of design, construction and operation, making proposals to improve the adequate incorporation of physical dimension in the environmental activities. A very important aspect, worked out in the investigation, has to do with the way as this dimension is described in the real terms of reference for EIA of the Ministry of Environment; that is why it is analysed and some elements are proposed which are to correct and to articulate properly the information in these studies, because some problems were found in the articulation and contents of the physical aspects in the studies of environmental impact (EIA). Another very important aspect, which was obtained with this research, is the methodological proposal for the integration of the components of the physical dimension in which s ynthesis units are defined in different scales for the integration of those components. These facts will facilitate a better understanding of the natural processes in the areas of influence of the projects and a better understanding of the reciprocal relations between the project and the physical surroundings. In the process of searching a methodology for integration of the components of the physical dimension it is hoped that the studies be more congruent from the environmental point of view

  11. Initial communication survey results for the Hanford Environmental Dose Reconstruction Project

    International Nuclear Information System (INIS)

    Beck, D.M.

    1991-03-01

    To support the public communication efforts of the Technical Steering Panel of the Hanford Environmental Dose Reconstruction (HEDR) Project, a public survey was conducted. The survey was intended to provide information about the public's knowledge and interest in the project and the best ways to communicate project results. Questions about the project were included as part of an omnibus survey conducted by Washington State University. The survey was conducted by phone to Washington State residents in the spring of 1990. This report gives the HEDR-related questions and summary data of responses. Questions associated with the HEDR Project were grouped into four categories: knowledge of the HEDR Project; interest in the project; preferred ways of receiving information about the project (including public information meetings, a newsletter mailed to homes, presentations to civic groups in the respondent's community, a computer bulletin board respondent could access with a modem, information displays at public buildings and shopping malls, and an information video sent to respondent); and level of concern over past exposure from Hanford operations. Questions abut whom state residents are most likely to trust about radiation issues were also part of the omnibus survey, and responses are included in this report

  12. Establishing an EnvironMentors Project to Guide Minority Students into Science, Technology, and Environmental Careers

    Energy Technology Data Exchange (ETDEWEB)

    Montague, W. E.

    2003-01-24

    This report of the EnvironMentors Project (TEP) for the period February 1994 through December 1998, provides a summary of activities at our program sites and of our overall organizational accomplishments. Notably, the EnvironMentors Project matched 506 teens from under-resourced neighborhoods in Washington (DC), Trenton (NJ), and Baltimore (MD) with mentors, engaged more than 1,600 members of the public in informative discussions of environmental research, and presented interactive environmental education lessons to approximately 5,700 elementary and middle school children.

  13. Environmental procedures

    International Nuclear Information System (INIS)

    1992-01-01

    The European Bank has pledged in its Agreement to place environmental management at the forefront of its operations to promote sustainable economic development in central and eastern Europe. The Bank's environmental policy is set out in the document titled, Environmental Management: The Bank's Policy Approach. This document, Environmental Procedures, presents the procedures which the European Bank has adopted to implement this policy approach with respect to its operations. The environmental procedures aim to: ensure that throughout the project approval process, those in positions of responsibility for approving projects are aware of the environmental implications of the project, and can take these into account when making decisions; avoid potential liabilities that could undermine the success of a project for its sponsors and the Bank; ensure that environmental costs are estimated along with other costs and liabilities; and identify opportunities for environmental enhancement associated with projects. The review of environmental aspects of projects is conducted by many Bank staff members throughout the project's life. This document defines the responsibilities of the people and groups involved in implementing the environmental procedures. Annexes contain Environmental Management: The Bank's Policy Approach, examples of environmental documentation for the project file and other ancillary information

  14. Environmental management systems

    OpenAIRE

    Misiak, Małgorzata

    2016-01-01

    Considering environmental protection requirements in business operations may, in the long run, determine if a lasting comparative advantage can be achieved. That is why our textbook, rich in case studies, identifies not only the threats a business may pose to the environment but stresses the ways of reducing its negative impact. It discusses, among other things, the concept of corporate social responsibility, environmental management systems, methods and the importance of eco-labelling goods ...

  15. Investigations of Heat Recovery in Different Refrigeration System Solutions in Supermarkets. Effsys2 project final report

    Energy Technology Data Exchange (ETDEWEB)

    Sawalha, Same; Chen, Yang

    2010-07-01

    Supermarkets are intensive energy consumers with constantly increasing number of installations. About 50 % of the energy consumption in the supermarket is absorbed by the refrigeration system to cover the cooling demands. Simultaneously, heating is needed in the supermarket where the rejected heat from the refrigeration system is usually higher than the needs. It is an interesting possibility to utilize the rejected heat from the refrigeration system to cover the heating needs in supermarkets. The objective of this project is to investigate the heat recovery performance of the new refrigeration system solutions in supermarket applications. The focus is on environmentally friendly systems with natural working fluids, mainly CO{sub 2} trans-critical systems. The project analyzes the temperature levels and capacities of rejected heat from different system solutions and investigates its matching with the heating needs in supermarkets. Using simulation tools this project also aims at defining the system solution/s which has good energy efficiency for simultaneous cooling and heat recovery.

  16. TransECO{sub 2}. Demonstration project: Environmental and economic benefits by environmental management in freight transportation. Main report; TransECO{sub 2}. Demonstrationsprojekt: Miljoemaessige og oekonomiske benefits ved miljoestyring i godstransport. Hovedrapport

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-07-01

    The aim of the transECO{sub 2} project has was to carry out cooperation projects between companies in order to demonstrate an effect for the environment and for the economy of the companies (earnings and costs) of environmental management related to transportation of goods. 10 demonstration projects were carried thorugh in cooperation with 14 companies. 8 subjects were analysed through the transECO{sub 2} project: 1. Environmental data; 2. Benefits from the environmental management work; 3. Use of new technology; 4. Cooperation; 5. Environment and logistics; 6. Education and competence; 7. Environment and business strategy; 8. Environmental statement/tagging. (EHS)

  17. Set up of an environmental monitoring system, Shchuchye, Russia - technical assistance - 59042

    International Nuclear Information System (INIS)

    Belbeze, Stephane; Hallouin, Matthieu

    2012-01-01

    An intergovernmental agreement on cooperation about chemical weapon destruction was signed between France and the Russian federation on 14. February 2006 in the context of a Global Partnership dedicated to preventing catastrophic terrorism and the proliferation of weapons of mass destruction. It came into effect on 25 April 2007 after ratification by both countries. The present demonstrated project was launched as part of this collaboration on the Shchuchye site (Russia - Kurgan Oblast). The project concerned the environmental surveillance system for the Shchuchye site required for the safe operation of the installation used to destroy chemical weapons. The aim was to implement equipments and methods of analysis for very low concentrations of pollutants in the three environmental compartments: air, water and soil. This has been achieved with the help of industry and other organizations in France (Environment/SA for supplies, INERIS and Antea Group) and Russia (ROST Association and EKROS Engineering). This system takes account of the normal operation of the installation as well as incident management. It includes 11 stationary atmospheric measuring stations constructed by Environment/SA and EKROS Engineering including ASTEK dedicated toxic gas detector: 'Terminator FOV-1', 3 mobile atmospheric measuring stations, 2 mobile soil and water measuring stations, 4 sampling cars constructed by Environment/SA and EKROS Engineering, a complete Chemical analysis laboratory which can handle ppb analysis of toxic gases, organics and minerals pollutants, an information collection center and a meteo station which can retrieve, display and archive all the data or alarm from the stationary and mobile stations. Antea Group has provided a technical expertise and various negotiations during the negotiation phase, the project initiation files and contracts redaction, the project Monitoring and reporting to stakeholders, the Rex. Up to 2009, No other site of the world uses such an

  18. Comparative assessment of the environmental impact of wastes from electricity generation systems

    International Nuclear Information System (INIS)

    Torres, C.; Smith, G.M.; Linsley, G.; Hossain, S.

    1994-01-01

    The paper describes an outline methodology for assessing and comparing the environmental impact arising from management of the wastes from nuclear and other electricity generation systems. The assessment framework is applicable to wastes from all generation systems, including nuclear, fossil and renewable fuel systems, and can also be applied to the management of mixed hazardous waste. The major energy technologies in terms of waste production can be classified according to three major categories of fuels: fossil, nuclear and renewable. The emphasis in this description is on nuclear utility low-level and mixed wastes and waste streams. The methodology may be used to support the project on Data Bases and Methodologies for Comparative Assessment of Different Energy Sources for Electricity Generation (DECADES project, (2)) which is being developed by the International Atomic Energy Agency in collaboration with other international agencies. The DECADES project has the overall objective to improve the abilities for comparative assessment of energy chains for electricity generation. The objective of a methodology such as that described here is to ensure that waste management aspects are included effectively in comparative assessments of energy systems. This paper discusses the waste strams arising from nuclear power plants

  19. ¡VAMOS! (Viable Alternative Mine Operating System) - a 'Horizon 2020' project

    Science.gov (United States)

    Sword, Cameron; Bodo, Balazs; Kapusniak, Stef; Bosman, Frank; Rainbird, Jenny; Silva, Eduardo

    2017-04-01

    The 42-month ¡VAMOS! project (Viable Alternative Mine Operating System, Grant Agreement 642477, www.vamos-project.eu), funded by the EC H2020 Programme, will enable access to high-grade EU reserves of mineral ore-bodies by developing an innovative clean and low visibility mining technique. The project will demonstrate the technological and economic viability of the underwater extraction of metallic mineral deposits which are currently technologically, economically, and environmentally unobtainable. In doing so, ¡VAMOS! hopes to encourage investment in abandoned open-pit mines and prospective mines, helping to put the EU back on a level playing field with the rest of the world in terms of access to strategically important minerals. The ¡VAMOS! concept is defined by a remotely-operated underwater mining vehicle, adapted and improved from existing subsea mining technology. Operating in tandem with an HROV, the mining vehicle will connect to a flexible riser through which slurried mined material will be pumped from the mudline to onshore dewatering facilities via a floating mobile deployment-module, on which will be fitted a bypass system linked to an LIBS, allowing real-time grade-control. Analysis of European and national regulation and stakeholder assessments found there is significant support for developing the technology among local communities and governments. An initial environmental assessment of the potential impact of the innovative mining operation concluded the project has a smaller environmental footprint than conventional mining operations: this is due to factors including the quieter operation and absence of blasting, zero water-table flux, and the higher stripping ratio enabled by higher fluid pressure acting on the sidewalls of the mine. The prototypes are currently in their construction phase following a final design freeze in October 2016. Work is now underway on the foresight visioning, economic evaluation and policy guidelines for the

  20. Columbia River System Operation Review final environmental impact statement. Appendix P: Canadian Entitlement Allocation Agreements (CEAA)

    International Nuclear Information System (INIS)

    1995-11-01

    The System Operation Review (SOR) is a study and environmental compliance process being used by the three Federal agencies to analyze future operations of the system and river use issues. The goal of the SOR is to achieve a coordinated system operation strategy for the river that better meets the needs of all river users. This technical appendix addresses only the effects of alternative system operating strategies for managing the Columbia River system. The purpose of this technical appendix is to provide the environmental review necessary to enter into agreements regarding the distribution between Federal and non-Federal project owners with respect to delivery of the Canadian Entitlement obligation to Canada for the period 1998 through 2024