WorldWideScience

Sample records for project deprad deployable

  1. Project implementation plan: ASTD remote deployment

    International Nuclear Information System (INIS)

    CRASS, D.W.

    1999-01-01

    This document is the project implementation plan for the ASTD Remote Deployment Project. The Plan identifies the roles and responsibilities for the project and defines the integration between the ASTD Project and the B-Cell Cleanout Project

  2. Bomber Deployments: A New Power Projection Strategy

    Science.gov (United States)

    2016-08-21

    AIR COMMAND AND STAFF COLLEGE DISTANCE LEARNING AIR UNIVERSITY BOMBER DEPLOYMENTS: A NEW POWER PROJECTION STRATEGY by...operating base (FOB), main operating base ( MOB ) and intermediate staging base (ISB).10 Each type of base requires certain actions to make it suitable for...closure of many main operating bases ( MOB ) overseas and the reluctance of many nations to permit permanent military bases on their soil.”15 This

  3. Supporting Knowledge Transfer in IS Deployment Projects

    Science.gov (United States)

    Schönström, Mikael

    To deploy new information systems is an expensive and complex task, and does seldom result in successful usage where the system adds strategic value to the firm (e.g. Sharma et al. 2003). It has been argued that innovation diffusion is a knowledge integration problem (Newell et al. 2000). Knowledge about business processes, deployment processes, information systems and technology are needed in a large-scale deployment of a corporate IS. These deployments can therefore to a large extent be argued to be a knowledge management (KM) problem. An effective deployment requires that knowledge about the system is effectively transferred to the target organization (Ko et al. 2005).

  4. Deployable bamboo structure project: A building life-cycle report

    Science.gov (United States)

    Firdaus, Adrian; Prastyatama, Budianastas; Sagara, Altho; Wirabuana, Revian N.

    2017-11-01

    Bamboo is considered as a sustainable material in the world of construction, and it is vastly available in Indonesia. The general utilization of the material is increasingly frequent, however, its usage as a deployable structure-a recently-developed use of bamboo, is still untapped. This paper presents a report on a deployable bamboo structure project, covering the entire building life-cycle phase. The cycle encompasses the designing; fabrication; transportation; construction; operation and maintenance; as well as a plan for future re-use. The building is made of a configuration of the structural module, each being a folding set of bars which could be reduced in size to fit into vehicles for easy transportation. Each structural module was made of Gigantochloa apus bamboo. The fabrication, transportation, and construction phase require by a minimum of three workers. The fabrication and construction phase require three hours and fifteen minutes respectively. The building is utilized as cafeteria stands, the operation and maintenance phase started since early March 2017. The maintenance plan is scheduled on a monthly basis, focusing on the inspection of the locking mechanism element and the entire structural integrity. The building is designed to allow disassembly process so that it is reusable in the future.

  5. Reedsport PB150 Deployment and Ocean Test Project

    Energy Technology Data Exchange (ETDEWEB)

    Hart, Phil [Ocean Power Technologies Inc., Pennington, NJ (United States)

    2016-06-03

    As the first utility scale wave power project in the US, the Wave Power Demonstration Project at Reedsport (OR) was planned to consist of 10 PowerBuoys (Phase II)1, located 2.5 miles off the coast. U.S. Department of Energy (DOE) funding under a prior DOE Grant (DE-FG36-08GO88017) along with funding from PNGC Power, an Oregon-based electric power cooperative, was utilized for the design completion, fabrication, assembly and factory testing of the first PowerBuoy for the Reedsport project. The design and fabrication of the first PowerBuoy and factory testing of the power take-off subsystem were completed, and the power take-off subsystem was successfully integrated into the spar at the fabricator’s facility in Oregon. The objectives of this follow-on grant were: advance PB150B design from TRL 5/6 to TRL 7/8; deploy a single PB150 and operate autonomously for 2 years; establish O&M costs; collect environmental information; and establish manufacturing methodologies.

  6. The New Mexico Technology Deployment Pilot Project: A technology reinvestment project. Final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-11-01

    The New Mexico Technology Deployment Project (NMTDP) has been in operation for slightly more than two years. As one of the original TRP projects, NMTDP had the charter to develop and validate a new model for technology extraction which emphasized focused technology collaboration, early industry involvement, and a strong dual use commercialization and productization emphasis. Taken in total, the first two years of the NMTDP have been exceptionally successful, surpassing the goals of the project. This report describes the accomplishments and evolution of the NMTDP to date and discusses the future potential of the project. Despite the end of federal funding, and a subsequent reduction in level of effort, the project partners are committed to continuation of the project.

  7. Integrated Incident Management System (IIMS) web client application development, deployment and evaluation Staten Island (SI) demonstration project : final report.

    Science.gov (United States)

    2015-09-27

    This evaluation report provides background on the development and findings. The aim of the UTRC project was to develop and : deploy Portable IIMS based on Smartphone web applications. Previously, traditional IIMS was deployed in the field vehicles : ...

  8. Quality function deployment (QFD in the development of training projects: an exploratory study for service

    Directory of Open Access Journals (Sweden)

    Francisco José Dias Junior

    2012-01-01

    Full Text Available Training is important in preparing employees. The Quality Function Deployment (QFD is an effective method to systematically translate customer requirements into project specifications. This study presents the use of QFD method in development of training project. It is a qualitative research conducted in the industry services company. The results show that the use of QFD is an effective alternative for managers to develop or improve their training projects.

  9. Wastewater Triad Project: Solid-Liquid Separator FY 2000 Deployment

    International Nuclear Information System (INIS)

    Walker, J.F.

    2001-01-01

    The Wastewater Triad Project (WTP) consists of three operational units: the cesium removal (CsR) system, the out-of-tank evaporator (OTE) system, and the solid/liquid separation (SLS) system. These systems were designed to reduce the volume and radioactivity of low-level liquid waste (LLLW) stored in the Melton Valley Storage Tanks (MVSTs) and are operated independently or in series in order to accomplish the treatment goals. Each is a modular, skid-mounted system that is self-contained, individually shielded, and designed to be decontaminated and removed once the project has been completed. The CsR and OTE systems are installed inside Building 7877; the SLS system is installed adjacent to the east side of the MVST 7830 vault cover. The CsR, which consists of ion-exchange equipment for removing 137 Cs from LLLW, was demonstrated in 1997. During the Cesium Removal Demonstration, 30,853 gal of radioactive supernate was processed and 1142 Ci of 137 Cs was removed from the supernate and loaded onto 70 gal of a crystalline silicotitanate sorbent manufactured by UOP, Inc. The OTE system is a subatmospheric single-stage evaporator system designed to concentrate LLLW to smaller volumes. It was previously demonstrated in 1996 and was operated in 1998 to process about 80,000 gal of LLLW. The SLS system was designed to filter and remove suspended solids from LLLW in order to minimize further accumulation of sludge in new storage tanks or to prevent fouling of CsR and OTE systems. The SLS was installed and demonstrated in 1999; ∼45,000 gal of radioactive supernate was processed during the demonstration

  10. The implications of the Kyoto project mechanisms for the deployment of renewable electricity in Europe

    Energy Technology Data Exchange (ETDEWEB)

    Gonzalez, P.D.R. [Universidad de Castilla-La Mancha, Toledo (Spain). Facultad de Ciencias Juridicas y Sociales; Hernandez, F. [IEG CSIC, Madrid (Spain); Gual, M. [Universidad Pablo de olavide, Sevilla (Spain)

    2005-10-01

    EU energy/environmental policy has at least two major and interrelated goals: to increase the percentage of electricity from renewable energy sources (RES-E) and to control the emission of GHG cost efficiently. These two goals could be in conflict. This paper explores one aspect of this conflicting relationship, namely the effect that the use of the Kyoto Protocol project mechanisms (CDM/JI project) may have on the deployment of RES-E within EU borders. The main conclusion is that, under certain assumptions (i.e., no mandatory EU RES-E quota), CDM/JI projects might reduce the incentive to deploy RES-E within EU borders because they would allow European power companies to comply with GHG targets in a cheaper way than if they reduced emissions by investing in renewable electricity in Europe. This is problematic, since many benefits from renewable electricity are local and these would be gone. This situation would be different if a mandatory RES-E quota (combined with an EU-wide TGC scheme) was implemented. In this case, the RES-E target would be fulfilled and CDM/JI projects would only affect RES-E deployment exceeding the target. (author)

  11. The implications of the Kyoto project mechanisms for the deployment of renewable electricity in Europe

    International Nuclear Information System (INIS)

    Rio Gonzalez, Pablo del; Hernandez, Felix; Gual, Miguel

    2005-01-01

    EU energy/environmental policy has at least two major and interrelated goals: to increase the percentage of electricity from renewable energy sources (RES-E) and to control the emission of GHG cost efficiently. These two goals could be in conflict. This paper explores one aspect of this conflicting relationship, namely the effect that the use of the Kyoto Protocol project mechanisms (CDM/JI project) may have on the deployment of RES-E within EU borders. The main conclusion is that, under certain assumptions (i.e., no mandatory EU RES-E quota), CDM/JI projects might reduce the incentive to deploy RES-E within EU borders because they would allow European power companies to comply with GHG targets in a cheaper way than if they reduced emissions by investing in renewable electricity in Europe. This is problematic, since many benefits from renewable electricity are local and these would be gone. This situation would be different if a mandatory RES-E quota (combined with an EU-wide TGC scheme) was implemented. In this case, the RES-E target would be fulfilled and CDM/JI projects would only affect RES-E deployment exceeding the target

  12. Integrated care services: lessons learned from the deployment of the NEXES project.

    Science.gov (United States)

    Hernández, Carme; Alonso, Albert; Garcia-Aymerich, Judith; Grimsmo, Anders; Vontetsianos, Theodore; García Cuyàs, Francesc; Altes, Anna Garcia; Vogiatzis, Ioannis; Garåsen, Helge; Pellise, Laura; Wienhofen, Leendert; Cano, Isaac; Meya, Montserrat; Moharra, Montserrat; Martinez, Joan Ignasi; Escarrabill, Juan; Roca, Josep

    2015-01-01

    To identify barriers to deployment of four articulated Integrated Care Services supported by Information Technologies in three European sites. The four services covered the entire spectrum of severity of illness. The project targeted chronic patients with obstructive pulmonary disease, cardiac failure and/or type II diabetes mellitus. One health care sector in Spain (Barcelona) (n = 11.382); six municipalities in Norway (Trondheim) (n = 450); and one hospital in Greece (Athens) (n = 388). The four services were: (i) Home-based long-term maintenance of rehabilitation effects (n = 337); (ii) Enhanced Care for frail patients, n = 1340); (iii) Home Hospitalization and Early Discharge (n = 2404); and Support for remote diagnosis (forced spirometry testing) in primary care (Support) (n = 8139). Both randomized controlled trials and pragmatic study designs were combined. Two technological approaches were compared. The Model for Assessment of Telemedicine applications was adopted. The project demonstrated: (i) Sustainability of training effects over time in chronic patients with obstructive pulmonary disease (p management, technological approach and legal issues were major factors modulating the success of the deployment. The project generated a business plan to foster service sustainability and health innovation. Deployment strategies require site-specific adaptations.

  13. Integrated care services: lessons learned from the deployment of the NEXES project

    Directory of Open Access Journals (Sweden)

    Carme Hernandez

    2015-03-01

    Full Text Available Objectives: To identify barriers to deployment of four articulated Integrated Care Services supported by Information Technologies in three European sites. The four services covered the entire spectrum of severity of illness. The project targeted chronic patients with obstructive pulmonary disease, cardiac failure and/or type II diabetes mellitus. Setting: One health care sector in Spain (Barcelona (n = 11.382; six municipalities in Norway (Trondheim (n = 450; and one hospital in Greece (Athens (n = 388. Method: The four services were: (i Home-based long-term maintenance of rehabilitation effects (n = 337; (ii Enhanced Care for frail patients, n = 1340; (iii Home Hospitalization and Early Discharge (n = 2404; and Support for remote diagnosis (forced spirometry testing in primary care (Support (n = 8139. Both randomized controlled trials and pragmatic study designs were combined. Two technological approaches were compared. The Model for Assessment of Telemedicine applications was adopted. Results: The project demonstrated: (i Sustainability of training effects over time in chronic patients with obstructive pulmonary disease (p < 0.01; (ii Enhanced care and fewer hospitalizations in chronic respiratory patients (p < 0.05; (iii Reduced in-hospital days for all types of patients (p < 0.001 in Home Hospitalization/Early Discharge; and (iv Increased quality of testing (p < 0.01 for patients with respiratory symptoms in Support, with marked differences among sites. Conclusions: The four integrated care services showed high potential to enhance health outcomes with cost-containment. Change management, technological approach and legal issues were major factors modulating the success of the deployment. The project generated a business plan to foster service sustainability and health innovation. Deployment strategies require site-specific adaptations.

  14. Integrated care services: lessons learned from the deployment of the NEXES project

    Directory of Open Access Journals (Sweden)

    Carme Hernandez

    2015-03-01

    Full Text Available Objectives: To identify barriers to deployment of four articulated Integrated Care Services supported by Information Technologies in three European sites. The four services covered the entire spectrum of severity of illness. The project targeted chronic patients with obstructive pulmonary disease, cardiac failure and/or type II diabetes mellitus.Setting: One health care sector in Spain (Barcelona (n = 11.382; six municipalities in Norway (Trondheim (n = 450; and one hospital in Greece (Athens (n = 388.Method: The four services were: (i Home-based long-term maintenance of rehabilitation effects (n = 337; (ii Enhanced Care for frail patients, n = 1340; (iii Home Hospitalization and Early Discharge (n = 2404; and Support for remote diagnosis (forced spirometry testing in primary care (Support (n = 8139. Both randomized controlled trials and pragmatic study designs were combined. Two technological approaches were compared. The Model for Assessment of Telemedicine applications was adopted.Results: The project demonstrated: (i Sustainability of training effects over time in chronic patients with obstructive pulmonary disease (p < 0.01; (ii Enhanced care and fewer hospitalizations in chronic respiratory patients (p < 0.05; (iii Reduced in-hospital days for all types of patients (p < 0.001 in Home Hospitalization/Early Discharge; and (iv Increased quality of testing (p < 0.01 for patients with respiratory symptoms in Support, with marked differences among sites.Conclusions: The four integrated care services showed high potential to enhance health outcomes with cost-containment. Change management, technological approach and legal issues were major factors modulating the success of the deployment. The project generated a business plan to foster service sustainability and health innovation. Deployment strategies require site-specific adaptations.

  15. TARZAN: A REMOTE TOOL DEPLOYMENT SYSTEM FOR THE WEST VALLEY DEVELOPMENT PROJECT

    International Nuclear Information System (INIS)

    Thompson, Bruce R.; Veri, James

    1999-01-01

    RedZone Robotics, Inc. undertook a development project to build Tarzan, a Remote Tool Delivery system to work inside nuclear waste storage tanks 8D-1 and 8D-2 at the West Valley Demonstration Project (WVDP). The removal of waste deposits from large storage tanks poses significant challenges during tank operations and closure. Limited access, the presence of chemical, radiological, and /or explosive hazards, and the need to deliver retrieval equipment to all regions of the tank exceed the capabilities of most conventional methods and equipment. Remotely operated devices for mobilizing and retrieving waste materials are needed. Some recent developments have been made in this area. However, none of these developments completely and cost-effectively address tanks that are congested with internal structures (e.g., support columns, cooling coils, fixed piping, etc.). The Tarzan system consists of the following parts: Locomotor which is deployed in the tank for inspection and cleanup; Hydraulic power unit providing system power for the locomotor and deployment unit; and Control system providing the man machine interface to control, coordinate and monitor the system. This document presents the final report on the Tarzan project

  16. Community Renewable Energy Deployment Provides Replicable Examples of Clean Energy Projects (Fact Sheet)

    Energy Technology Data Exchange (ETDEWEB)

    2012-09-01

    This fact sheet describes the U.S. Department of Energy's Community Renewable Energy Deployment (CommRE) program, which is a more than $20 million effort funded through the American Recovery and Reinvestment Act of 2009, to promote investment in clean energy solutions and provide real-life examples for other local governments, campuses, and small utilities to replicate. Five community-based renewable energy projects received funding from DOE through the CommRE and their progress is detailed.

  17. Accelerated Innovation Deployment (AID) Demonstration Project : Intelligent Compaction and Infrared Scanning Projects

    Science.gov (United States)

    2018-02-01

    This report documents the Missouri Department of Transportation (MoDOT) demonstration grant award for field demonstration projects using intelligent compaction (IC) and infrared scanning (IR) (also called paver-mounted thermal profiles PMTP in the AA...

  18. Towards Interoperable IoT Deployments inSmart Cities - How project VITAL enables smart, secure and cost- effective cities

    OpenAIRE

    Schiele , Gregor; Soldatos , John; Mitton , Nathalie

    2014-01-01

    International audience; IoT-based deployments in smart cities raise several challenges, especially in terms of interoperability. In this paper, we illustrate semantic interoperability solutions for IoT systems. Based on these solutions, we describe how the FP7 VITAL project aims to bridge numerous silo IoT deployments in smart cities through repurposing and reusing sensors and data streams across multiple applications without carelessly compromising citizens’ security and privacy. This approa...

  19. Large-scale demonstration and deployment project at Los Alamos National Laboratory

    International Nuclear Information System (INIS)

    Brown, S.; McFee, J.; Broom, C.; Dugger, H.; Stallings, E.

    1999-01-01

    Established by the US Department of Energy (DOE) Environmental Management program through its Office of Science and Technology, the Deactivation and Decommissioning Focus Area is developing answers to the technological problems that hinder Environmental Management's extensive cleanup efforts. The optimized application of technologies to ongoing nuclear facility decontamination and dismantlement is critical in meeting the challenge of decommissioning approximately 9,000 buildings and structures within the DOE complex. The significant technical and economic concerns in this area underscore a national imperative for the qualification and timely delivery of cost-reduction technologies and management approaches to meet federal and private needs. At Los Alamos National Laboratory (LANL), a Large-Scale Demonstration and Deployment Project (LSDDP) has been established to facilitate demonstration and deployment of technologies for the characterization, decontamination, and volume reduction of oversized metallic waste, mostly in the form of gloveboxes contaminated with transuranic radionuclides. The LANL LSDDP is being managed by an integrated contractor team (ICT) consisting of IT Corporation, ICF Incorporated, and Florida International University and includes representation from LANL's Environmental Management Program Office. The ICT published in the Commerce Business Daily a solicitation for interest for innovative technologies capable of improving cost and performance of the baseline process. Each expression of interest response was evaluated and demonstration contract negotiations are under way for those technologies expected to be capable of meeting the project objectives. This paper discusses management organization and approach, the results of the technology search, the technology selection methodology, the results of the selection process, and future plans for the program

  20. Final Project Closeout Report for Sprint Hydrogen Fuel Cell (HFC) Deployment Project in California, Gulf Coast and Eastern Seaboard Markets

    Energy Technology Data Exchange (ETDEWEB)

    Kenny, Kevin [Sprint, Reston, VA (United States); Bradley, Dwayne [Burns & McDonnell, Kansas City, MO (United States)

    2015-09-01

    Sprint is one of the telecommunications industry leaders in the deployment of hydrogen fuel cell (HFC) systems to provide backup power for their mission critical wireless network facilities. With several hundred fuel cells commissioned in California, states in the gulf coast region, and along the upper eastern seaboard. A strong incentive for advancing the integration of fuel cells into the Sprint network came through the award of a Department of Energy (DOE) grant focused on Market Transformation activities for project (EE0000486). This grant was funded by the 2009 American Recovery and Reinvestment Act (ARRA). The funding provided by DOE ($7.295M) was allocated to support the installation of 260 new HFC systems, equipped with an on-site refillable Medium Pressure Hydrogen Storage Solution (MPHSS), as well as for the conversion of 21 low pressure hydrogen systems to the MPHSS, in hopes of reducing barriers to market acceptance.

  1. The ADVANCE project: Formal evaluation of the targeted deployment. Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-01-01

    The Advanced Driver and Vehicle Advisory Navigation ConcEpt (ADVANCE) was an invehicle advanced traveler information system (ATIS) that operated in the northwest suburbs of Chicago, Illinois. It was designed to provide origin-destination shortest-time route guidance to a vehicle based on (a) an on-board static (fixed) data base of average network link travel times by time of day, combined as available and appropriate with (b) dynamic (real-time) information on traffic conditions provided by radio frequency (RF) communications to and from a traffic information center (TIC). Originally conceived in 1990 as a major project that would have installed 3,000 to 5,000 route guidance units in privately owned vehicles throughout the test area, ADVANCE was restructured in 1995 as a {open_quotes}targeted deployment,{close_quotes} in which approximately 80 vehicles were to be equipped with the guidance units - Mobile Navigation Assistants (MNAs) - to be in full communication with the TIC while driving the ADVANCE test area road system. Volume one consists of the evaluation managers overview report, and several appendices containing test results.

  2. Multi-Site Project Management A Program for Reducing the Cost of Technology Deployment at Department of Energy Sites

    International Nuclear Information System (INIS)

    Davis, N.R.; Selden, E.R.; Little, D.B.; Coleman, M.C.; Bennett, J.T.

    2009-01-01

    Retrieval and processing of High Level Waste (HLW) stored in Department of Energy (DOE) waste tanks is performed to support closure of the tanks as required by site specific regulatory agreements. Currently, there are four sites in the DOE Complex that have HLW tanks and must process and disposition HLW. As such, there is an opportunity to achieve an economy of scale and reduce duplication of efforts. Two or more sites typically have similar technology development and deployment needs. Technology development is already executed at the national level. As the technology is matured, the next step is to commission a design/build project. Typically each site performs this separately due to differences in waste type, tank design, site specific considerations such as proximity to the water table or to the site boundary. The focus of the individual sites tends to be on the differences between sites versus on the similarities thus there is an opportunity to minimize the cost for similar deployments. A team of engineers and project management professionals from the Savannah River Site has evaluated technology needs at the four HLW sites and determined that there is an economy of scale that can be achieved by specific technology deployments in the area of waste retrieval, waste pretreatment and waste disposition. As an example, the Waste on Wheels tank retrieval system (presented in the 2006 Waste Management Symposium) was designed and fabricated in portable modules that could be installed in HLW tanks at Hanford, Savannah River or Idaho. This same concept could be used for modular in-tank cesium removal process and equipment, tank cleaning mechanical equipment, and chemical tank cleaning process and equipment. The purpose of this paper is to present a multi-site project management approach that will reduce deployment costs and be consistent with DOE Order 413.3 project management principles. The approach will describe how projects can be managed by a lead site with

  3. Mobile/Modular Deployment Project-Enhancing Efficiencies within the National Transuranic Waste Program

    International Nuclear Information System (INIS)

    Triay, I.R.; Basabilvazo, G.B.; Countiss, S.; Moody, D.C.; Behrens, R.G.; Lott, S.A.

    2002-01-01

    In 1999, the National Transuranic (TRU) Waste Program (NTP) achieved two significant milestones. First, the Waste Isolation Plant (WIPP) opened in March for the permanent disposal of TRU waste generated by, and temporarily stored at, various sites supporting the nation's defense programs. Second, the Hazardous Waste Facility Permit, issued by the New Mexico Environment Department, for WIPP became effective in November. While the opening of WIPP brought to closure a number of scientific, engineering, regulatory, and political challenges, achieving this major milestone led to a new set of challenges-how to achieve the Department of Energy's (DOE's) NTP end-state vision: All TRU waste from DOE sites scheduled for closure is removed All legacy TRU waste from DOE sites with an ongoing nuclear mission is disposed 0 All newly generated TRU waste is disposed as it is generated The goal is to operate the national TRU waste program safely, cost effectively, in compliance with applicable regulations and agreements, and at full capacity in a fully integrated mode. The existing schedule for TRU waste disposition would achieve the NTP vision in 2034 at an estimated life-cycle cost of $16B. The DOE's Carlsbad Field Office (CBFO) seeks to achieve this vision early-by at least 10 years- while saving the nation an estimated $48 to $6B. CBFO's approach is to optimize, or to make as functional as possible, TRU waste disposition. That is, to remove barriers that impede waste disposition, and increase the rate and cost efficiency of waste disposal at WIPP, while maintaining safety. The Mobile/Modular Deployment Project (MMDP) is the principal vehicle for implementing DOE's new commercial model of using best business practices of national authorization basis, standardization, and economies of scale to accelerate the completion of WIPP's mission. The MMDP is one of the cornerstones of the National TRU Waste System Optimization Project (1). The objective of the MMDP is to increase TRU

  4. Deploying SHRP2 renewal 10 guidebook for project management strategies for complex projects in the Georgia Department of Transportation.

    Science.gov (United States)

    2017-01-01

    The Georgia Department of Transportation (GDOT) was selected by the Federal Highway Administration (FHWA) for the Strategic Highway Research Program 2 (SHRP2) Lead Adopter Incentive Implementation Assistance Grant to deploy the Renewal 10 (R10) Guide...

  5. Model for deployment of a Quality Assurance System in the nuclear fuel cycle facilities using Project Management techniques

    Energy Technology Data Exchange (ETDEWEB)

    Lage, Ricardo F.; Ribeiro, Saulo F.Q., E-mail: rflage@gmail.com, E-mail: quintao.saulo@gmail.com [Industrias Nucleares do Brasil (INB), Rio de Janeiro, RJ (Brazil)

    2015-07-01

    The Nuclear Safety is the main goal in any nuclear facility. In this sense the Norm CNEN-NN-1.16 classifies the quality assurance issue as a management system to be deployed and implemented by the organization to achieving security goals. Quality Assurance is a set of systematic and planned actions necessary to provide adequate confidence ensuring that a structure, system, component or installation will work satisfactorily in s. Hence, the Quality Assurance System (QAS) is a complete and comprehensive methodology, going far beyond a management plan quality from the perspective of project management. The fundamental of QAS requirements is all activities that influence the quality, involving organizational, human resources, procurement, nuclear safety, projects, procedures and communication. Coordination of all these elements requires a great effort by the team responsible because it usually involves different areas and different levels of hierarchy within the organization. The objectives and desired benefits should be well set for everyone to understand what it means to be achieved and how to achieve. The support of senior management is critical at this stage, providing guidelines and resources necessary to get the job elapse clearly and efficiently, on time, cost and certain scope. The methodology of project management processes can be applied to facilitate and expedite the implementation of this system. Many of the principles of the QAS are correlated with knowledge areas of project management. The proposed model for implementation of a QAS in the nuclear fuel cycle facilities considered the best project management practices according to the Project Management Book of Knowledge (PMBOK - 5th edition) of the Project Management Institute (PMI). This knowledge is considered very good practices around the world. Since the model was defined, the deployment process becomes more practical and efficient, providing reduction in deployment time, better management of human

  6. Model for deployment of a Quality Assurance System in the nuclear fuel cycle facilities using Project Management techniques

    International Nuclear Information System (INIS)

    Lage, Ricardo F.; Ribeiro, Saulo F.Q.

    2015-01-01

    The Nuclear Safety is the main goal in any nuclear facility. In this sense the Norm CNEN-NN-1.16 classifies the quality assurance issue as a management system to be deployed and implemented by the organization to achieving security goals. Quality Assurance is a set of systematic and planned actions necessary to provide adequate confidence ensuring that a structure, system, component or installation will work satisfactorily in s. Hence, the Quality Assurance System (QAS) is a complete and comprehensive methodology, going far beyond a management plan quality from the perspective of project management. The fundamental of QAS requirements is all activities that influence the quality, involving organizational, human resources, procurement, nuclear safety, projects, procedures and communication. Coordination of all these elements requires a great effort by the team responsible because it usually involves different areas and different levels of hierarchy within the organization. The objectives and desired benefits should be well set for everyone to understand what it means to be achieved and how to achieve. The support of senior management is critical at this stage, providing guidelines and resources necessary to get the job elapse clearly and efficiently, on time, cost and certain scope. The methodology of project management processes can be applied to facilitate and expedite the implementation of this system. Many of the principles of the QAS are correlated with knowledge areas of project management. The proposed model for implementation of a QAS in the nuclear fuel cycle facilities considered the best project management practices according to the Project Management Book of Knowledge (PMBOK - 5th edition) of the Project Management Institute (PMI). This knowledge is considered very good practices around the world. Since the model was defined, the deployment process becomes more practical and efficient, providing reduction in deployment time, better management of human

  7. AmI and deployment considerations in AAL services provision for elderly independent living: the MonAMI project.

    Science.gov (United States)

    Falcó, Jorge L; Vaquerizo, Esteban; Lain, Luis; Artigas, Jose Ignacio; Ibarz, Alejandro

    2013-07-12

    The MonAMI project aims to investigate the feasibility of the deployment of open platforms for Ambient Assisted Living (AAL) services provision based on Ambient Intelligence (AmI) and to test user acceptance and the usability of the services. Services were designed to provide support in the areas of environmental control, security, well-being and leisure. These services were installed and evaluated in a Spanish geriatric residence. The participants included elderly persons with disabilities, nursing home care givers and informal carers. The concept of the open platform proved to be satisfactory for the provision of the services in a context aware framework. Furthermore, the usability of the technology was viewed positively and the overall results indicate that this system has the potential to prolong independent living at home for elderly people with disabilities. Deployment was proven successful and awareness of open-platform AAL service delivery was raised in local communities throughout Europe.

  8. AmI and Deployment Considerations in AAL Services Provision for Elderly Independent Living: The MonAMI Project

    Directory of Open Access Journals (Sweden)

    Alejandro Ibarz

    2013-07-01

    Full Text Available The MonAMI project aims to investigate the feasibility of the deployment of open platforms for Ambient Assisted Living (AAL services provision based on Ambient Intelligence (AmI and to test user acceptance and the usability of the services. Services were designed to provide support in the areas of environmental control, security, well-being and leisure. These services were installed and evaluated in a Spanish geriatric residence. The participants included elderly persons with disabilities, nursing home care givers and informal carers. The concept of the open platform proved to be satisfactory for the provision of the services in a context aware framework. Furthermore, the usability of the technology was viewed positively and the overall results indicate that this system has the potential to prolong independent living at home for elderly people with disabilities. Deployment was proven successful and awareness of open-platform AAL service delivery was raised in local communities throughout Europe.

  9. Accelerated Innovation Deployment (AID) Demonstration : KYTC—Roundabout Installation Project in London, Kentucky.

    Science.gov (United States)

    2017-11-01

    This document serves as the final report on the construction and opening of the Roundabout Project in London, Kentucky (Kentucky Item Number 11904.1). This project (hereafter referred to as the London Roundabout) was constructed on the authority o...

  10. Prediction of optimal deployment projection for transcatheter aortic valve replacement: angiographic 3-dimensional reconstruction of the aortic root versus multidetector computed tomography.

    OpenAIRE

    Binder Ronald K; Leipsic Jonathon; Wood David; Moore Teri; Toggweiler Stefan; Willson Alex; Gurvitch Ronen; Freeman Melanie; Webb John G

    2012-01-01

    BACKGROUND Identifying the optimal fluoroscopic projection of the aortic valve is important for successful transcatheter aortic valve replacement (TAVR). Various imaging modalities including multidetector computed tomography (MDCT) have been proposed for prediction of the optimal deployment projection. We evaluated a method that provides 3 dimensional angiographic reconstructions (3DA) of the aortic root for prediction of the optimal deployment angle and compared it with MDCT. METHODS AND RES...

  11. Deployment of a Prototype Plant GFP Imager at the Arthur Clarke Mars Greenhouse of the Haughton Mars Project

    Directory of Open Access Journals (Sweden)

    Robert J. Ferl

    2008-04-01

    Full Text Available The use of engineered plants as biosensors has made elegant strides in the past decades, providing keen insights into the health of plants in general and particularly in the nature and cellular location of stress responses. However, most of the analytical procedures involve laboratory examination of the biosensor plants. With the advent of the green fluorescence protein (GFP as a biosensor molecule, it became at least theoretically possible for analyses of gene expression to occur telemetrically, with the gene expression information of the plant delivered to the investigator over large distances simply as properly processed fluorescence images. Spaceflight and other extraterrestrial environments provide unique challenges to plant life, challenges that often require changes at the gene expression level to accommodate adaptation and survival. Having previously deployed transgenic plant biosensors to evaluate responses to orbital spaceflight, we wished to develop the plants and especially the imaging devices required to conduct such experiments robotically, without operator intervention, within extraterrestrial environments. This requires the development of an autonomous and remotely operated plant GFP imaging system and concomitant development of the communications infrastructure to manage dataflow from the imaging device. Here we report the results of deploying a prototype GFP imaging system within the Arthur Clarke Mars Greenhouse (ACMG an autonomously operated greenhouse located within the Haughton Mars Project in the Canadian High Arctic. Results both demonstrate the applicability of the fundamental GFP biosensor technology and highlight the difficulties in collecting and managing telemetric data from challenging deployment environments.

  12. Lessons learned in the deployment of a HIV counseling and testing management information system on a new project.

    Science.gov (United States)

    Makinde, Olusesan A; Ezomike, Chioma F; Lehmann, Harold P; Ibanga, Iko J

    2011-11-28

    To share our experience on how we used simple but detailed processes and deployed a management information system on a new HIV counseling and testing (HCT) project in Nigeria. The procedures used in this study were adopted for their strength in identifying areas of continuous improvement as the project was implemented. We used an iterative brainstorming technique among 30 participants (volunteer counselors and project management staff) as well as iterative quality audits to identify several limitations to the success of the project and to propose solutions. We then implemented the solutions and reevaluated for performance. Findings from the evaluations were then reintroduced into the brainstorming and planning sessions. Several limitations were identified with the most prominent being the poor documentation of records at the site and the lack of a document transfer trail for audit purposes. Communication, cohesion and team focus are necessary to achieve success on any new project. Institutionalizing routine HIV behavioral surveillance using data collected at HCT will help in streamlining interventions that will be evidence-based. 2011 Wolters Kluwer Health | Lippincott Williams & Wilkins

  13. DEPLOYMENT OF GOALS AND PROJECT PERFORMANCE MANAGEMENT CASE STUDY IN THE ENGINEERING DEPARTMENT OF PETROBRAS

    Directory of Open Access Journals (Sweden)

    Antonio Carlos de Lemos Oliveira

    2011-05-01

    Full Text Available The dynamic technology innovations and the constant changes in the world geopolitical scenarios have been creating turbulences in the majority of the environments in which the petroleum industry organizations are situated. Therefore, it is vital for the development and survival of these organizations that they establish a management and planning process capable of offering flexible answers to all challenges that arise in this business. Inside this context, this paper intends to investigate the ongoing techniques used for the deployment of goals and performance management of the employees who work for the engineering department of Petrobras, comparing the behavior of four organization structures named UIE - Unidade de Implementação de Empreendimento, considering some of their scores and the results of the existing individual management body of each of these structures. The main research instruments used in this case study were the documental analyses and semi-structured interviews with the main authors of the formulation and implementation process for the planning and management of the company, beyond the direct observation of these process. The paper accomplishes its goals and brings results and proposals that perceive a continuous development of the Performance Management system in the engineering department of Petrobras.

  14. Vision and Displays for Military and Security Applications The Advanced Deployable Day/Night Simulation Project

    CERN Document Server

    Niall, Keith K

    2010-01-01

    Vision and Displays for Military and Security Applications presents recent advances in projection technologies and associated simulation technologies for military and security applications. Specifically, this book covers night vision simulation, semi-automated methods in photogrammetry, and the development and evaluation of high-resolution laser projection technologies for simulation. Topics covered include: advances in high-resolution projection, advances in image generation, geographic modeling, and LIDAR imaging, as well as human factors research for daylight simulation and for night vision devices. This title is ideal for optical engineers, simulator users and manufacturers, geomatics specialists, human factors researchers, and for engineers working with high-resolution display systems. It describes leading-edge methods for human factors research, and it describes the manufacture and evaluation of ultra-high resolution displays to provide unprecedented pixel density in visual simulation.

  15. Deploying innovative technologies to improve DOE D ampersand D project baselines

    International Nuclear Information System (INIS)

    Rose, R.W.

    1997-05-01

    The insertion of innovative technologies to replace baseline technologies used in cost estimation and planning of DOE D ampersand D projects is considered a high risk endeavor by project and programmatic decision makers. It is almost always considered safer to go with the open-quotes devil you knowclose quotes than use a new or untried technology, methodology or system. The decision on the specific technology to be utilized to remediate a problem is often made months or years in advance of execution, and the highly proscriptive documentation of agreements necessary to obtain stakeholder and regulator approval of remedial plans is often counterproductive to considering improved technologies

  16. The Quest CCS Project - MMV Technology Deployment Through Two Years of Operation

    Science.gov (United States)

    O'Brien, S.

    2017-12-01

    In September 2012, Shell, on behalf of the Athabasca Oil Sands Project venture (Shell Canada Energy, Chevron Canada Limited, Marathon Oil Canada Corporation), announced that it was proceeding to construct the Quest Carbon Capture and Storage (CCS) project near Fort Saskatchewan. Quest is the world's first large-scale commercial application of CCS at an oil sands operation, and it is now capturing more than one million tonnes of CO2 per year from the Scotford Upgrader. It is a fully integrated project, involving CO2 capture at the bitumen upgrader, transportation along a 65 km pipeline, and CO2 storage in a deep saline aquifer (the Basal Cambrian Sands). Construction was completed in August 2015, and the Quest project was certified for commercial operation in September 2015. The Measurement, Monitoring and Verification (MMV) program for Quest is comprehensive, with a variety of technologies being used to monitor the atmosphere, hydrosphere, biosphere and geosphere. These include a Lightsource system for atmospheric monitoring, extensive groundwater sampling, DAS VSPs to assess the development of the CO2 plume, a microseismic array to measure any induced seismic activity, and temperature and pressure gauges for reservoir monitoring. Over two years of operations, this program has been optimized to address key risks while improving operational efficiency. Quest has now successfully captured and stored more than 2 million tonnes of CO2 with no MMV indications of any storage issues.

  17. Modeling EERE Deployment Programs

    Energy Technology Data Exchange (ETDEWEB)

    Cort, K. A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Hostick, D. J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Belzer, D. B. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Livingston, O. V. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2007-11-01

    This report compiles information and conclusions gathered as part of the “Modeling EERE Deployment Programs” project. The purpose of the project was to identify and characterize the modeling of deployment programs within the EERE Technology Development (TD) programs, address possible improvements to the modeling process, and note gaps in knowledge in which future research is needed.

  18. The ADVANCE project: Formal evaluation of the targeted deployment. Volume 3

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-01-01

    ADVANCE [Advanced Driver and Vehicle Advisory Navigation ConcEpt] was a public/private partnership conceived and developed by four founding parties. The founding parties include the Federal Highway Administration (FHWA), the Illinois Department of Transportation (IDOT), the University of Illinois at Chicago and Northwestern University operating together under the auspices of the Illinois Universities Transportation Research Consortium (IUTRC), and Motorola, Inc. The major responsibilities of each party are fully described in the Project agreement. Subsequently, these four were joined on the Steering Committee by the American Automobile Association (AAA). This unique blending of public sector, private sector and university interests, augmented by more than two dozen other private sector participants, provided a strong set of resources for ADVANCE. The ADVANCE test area covered over 300 square miles including portions of the City of Chicago and 40 northwest suburban communities. The Project encompasses the high growth areas adjacent to O`Hare International Airport, the Schaumbura/Hoffman Estates office and retail complexes, and the Lake-Cook Road development corridor. It also includes major sports and entertainment complexes such as the Arlington International Racecourse and the Rosemont Horizon. The population in the area is more than 750,000. This volume provides a summary of the insights and achievements made as a result of this field test, and selected appendices containing more detailed information.

  19. Fuel Cell-Powered Lift Truck Fleet Deployment Projects Final Technical Report May 2014

    Energy Technology Data Exchange (ETDEWEB)

    Klingler, James J [GENCO Infrastructure Solutions, Inc.

    2014-05-06

    The overall objectives of this project were to evaluate the performance, operability and safety of fork lift trucks powered by fuel cells in large distribution centers. This was accomplished by replacing the batteries in over 350 lift trucks with fuel cells at five distribution centers operated by GENCO. The annual cost savings of lift trucks powered by fuel cell power units was between $2,400 and $5,300 per truck compared to battery powered lift trucks, excluding DOE contributions. The greatest savings were in fueling labor costs where a fuel cell powered lift truck could be fueled in a few minutes per day compared to over an hour for battery powered lift trucks which required removal and replacement of batteries. Lift truck operators where generally very satisfied with the performance of the fuel cell power units, primarily because there was no reduction in power over the duration of a shift as experienced with battery powered lift trucks. The operators also appreciated the fast and easy fueling compared to the effort and potential risk of injury associated with switching heavy batteries in and out of lift trucks. There were no safety issues with the fueling or operation of the fuel cells. Although maintenance costs for the fuel cells were higher than for batteries, these costs are expected to decrease significantly in the next generation of fuel cells, making them even more cost effective.

  20. SMART 3D SUBSURFACE CONTAMINANT CHARACTERIZATION AT THE BGRR DECOMMISSIONING PROJECT. ACCELERATED SITE TECHNOLOGY DEPLOYMENT COST AND PERFORMANCE REPORT

    International Nuclear Information System (INIS)

    HEISER, J.; KALB, P.; SULLIVAN, T.; MILIAN, L.

    2001-01-01

    The Brookhaven Graphite Research Reactor (BGRR), which operated from 1951--1968 is currently undergoing decontamination and decommissioning (D and D). As part of this effort, many of the major structures and facilities (e.g., Above Grade Ducts, Cooling Fans, Pile Fan Sump, Transfer Canal and Instruments Houses) are being removed to eliminate contaminants and reduce the footprint of the overall facility. However, a significant cost savings (almost $5M) can potentially be realized if the large concrete Below Grade Ducts (BGD) can be decontaminated and left in place. In order to do this, soils beneath the ducts must be fully characterized to identify areas where contaminants may have leaked, what radioactive and hazardous contaminants remain, and in what concentrations. This information will then be used to evaluate whether discrete areas of localized contaminated soil can be selectively removed or, if the contamination is significant and widespread, and whether the ducts themselves must be removed for complete cleanup. The information generated from this effort is input into the BGRR BGD Characterization Report and an Engineering Evaluation/Cost Analysis (EE/CA) currently being prepared to evaluate potential options for the ducts. This FY01 Department of Energy Accelerated Site Technology Deployment (DOE ASTD) project combined a suite of innovative technologies to provide cost-effective characterization of the soils beneath the BGD and present the data in an easily understandable three-dimensional representation of the contaminant concentrations beneath the ducts. Conventional characterization of the soil would have required sampling a very large area in a tight grid pattern to ensure that all areas of potential contamination were evaluated. It is estimated that using baseline techniques would require approximately 2500 samples (costing ∼$1.6M), depending on the level of precision required by regulators. This massive amount of data would then be difficult to

  1. Modeling EERE deployment programs

    Energy Technology Data Exchange (ETDEWEB)

    Cort, K. A. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Hostick, D. J. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Belzer, D. B. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Livingston, O. V. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2007-11-01

    The purpose of the project was to identify and characterize the modeling of deployment programs within the EERE Technology Development (TD) programs, address possible improvements to the modeling process, and note gaps in knowledge for future research.

  2. RSOI: Force Deployment Bottleneck

    National Research Council Canada - National Science Library

    D'Amato, Mark

    1998-01-01

    .... This runs counter to the popular belief that strategic lift is the limiting constraint. The study begins by highlighting the genesis of the military's current force projection strategy and the resulting importance of rapid force deployments...

  3. Prediction of optimal deployment projection for transcatheter aortic valve replacement: angiographic 3-dimensional reconstruction of the aortic root versus multidetector computed tomography.

    Science.gov (United States)

    Binder, Ronald K; Leipsic, Jonathon; Wood, David; Moore, Teri; Toggweiler, Stefan; Willson, Alex; Gurvitch, Ronen; Freeman, Melanie; Webb, John G

    2012-04-01

    Identifying the optimal fluoroscopic projection of the aortic valve is important for successful transcatheter aortic valve replacement (TAVR). Various imaging modalities, including multidetector computed tomography (MDCT), have been proposed for prediction of the optimal deployment projection. We evaluated a method that provides 3-dimensional angiographic reconstructions (3DA) of the aortic root for prediction of the optimal deployment angle and compared it with MDCT. Forty patients undergoing transfemoral TAVR at St Paul's Hospital, Vancouver, Canada, were evaluated. All underwent preimplant 3DA and 68% underwent preimplant MDCT. Three-dimensional angiographic reconstructions were generated from images of a C-arm rotational aortic root angiogram during breath-hold, rapid ventricular pacing, and injection of 32 mL contrast medium at 8 mL/s. Two independent operators prospectively predicted perpendicular valve projections. The implant angle was chosen at the discretion of the physician performing TAVR. The angles from 3DA, from MDCT, the implant angle, and the postdeployment perpendicular prosthesis view were compared. The shortest distance from the postdeployment perpendicular prosthesis projection to the regression line of predicted perpendicular projections was calculated. All but 1 patient had adequate image quality for reproducible angle predictions. There was a significant correlation between 3DA and MDCT for prediction of perpendicular valve projections (r=0.682, Pregression line of predicted angles to the postdeployment prosthesis view was 5.1±4.6° for 3DA and 7.9±4.9° for MDCT (P=0.01). Three-dimensional angiographic reconstructions and MDCT are safe, practical, and accurate imaging modalities for identifying the optimal perpendicular valve deployment projection during TAVR.

  4. Deployment Repeatability

    Science.gov (United States)

    2016-04-01

    evaluating the deployment repeatability builds upon the testing or analysis of deployment kinematics (Chapter 6) and adds repetition. Introduction...material yield or failure during a test. For the purposes of this chapter, zero shift will refer to permanent changes in the structure, while reversible ...the content of other chapters in this book: Gravity Compensation (Chapter 4) and Deployment Kinematics and Dynamics (Chapter 6). Repeating the

  5. Cooperative Technolgy Deployed

    NARCIS (Netherlands)

    Koenders, E.; Velt, R. in 't

    2011-01-01

    After the successful demonstrations of cooperative technology by the CVIS and Safespot projects the question remains how this technology can be successfully deployed. This question is explored by the Field Operational Test project FREILOT, which aims to provide fuel economy applications that must be

  6. Modeling EERE Deployment Programs

    Energy Technology Data Exchange (ETDEWEB)

    Cort, Katherine A.; Hostick, Donna J.; Belzer, David B.; Livingston, Olga V.

    2007-11-08

    The purpose of this report is to compile information and conclusions gathered as part of three separate tasks undertaken as part of the overall project, “Modeling EERE Deployment Programs,” sponsored by the Planning, Analysis, and Evaluation office within the Department of Energy’s Office of Energy Efficiency and Renewable Energy (EERE). The purpose of the project was to identify and characterize the modeling of deployment programs within the EERE Technology Development (TD) programs, address improvements to modeling in the near term, and note gaps in knowledge where future research is needed.

  7. Design, development and deployment of a hand/wrist exoskeleton for home-based rehabilitation after stroke - SCRIPT project

    OpenAIRE

    Amirabdollahian, F; Ates, Sedar; Basteris, A.; Cesario, A.; Buurke, Jaap; Hermens, Hermanus J.; Hofs, D.; Johansson, E.; Mountain, G.; Nasr, N.; Nijenhuis, S.M.; Prange, Grada Berendina; Rahman, N.; Sale, P.; Schätzlein, F.

    2014-01-01

    Objective: this manuscript introduces the Supervised Care and Rehabilitation Involving Personal Tele-robotics (SCRIPT) project. The main goal is to demonstrate design and development steps involved in a complex intervention, while examining feasibility of using an instrumented orthotic device for home-based rehabilitation after stroke. Methods: the project uses a user-centred design methodology to develop a hand/wrist rehabilitation device for home-based therapy after stroke. The patient bene...

  8. Advanced OS deployment system

    OpenAIRE

    Galiano Molina, Sebastián

    2007-01-01

    The main project’s objective is to design and build an OS deployment system taking advantage of the Linux OS and the Open Source community developments. This means to use existing technologies that modularize the system. With this philosophy in mind, the number of developed code lines within the project is keeping as small as possible. As REMBO, the OS deployment system to develop has to be transparent to the user. This means a system with a friendly user interface and no te...

  9. Design, development and deployment of a hand/wrist exoskeleton for home-based rehabilitation after stroke - SCRIPT project

    NARCIS (Netherlands)

    Amirabdollahian, F; Ates, Sedar; Basteris, A.; Cesario, A.; Buurke, Jaap; Hermens, Hermanus J.; Hofs, D.; Johansson, E.; Mountain, G.; Nasr, N.; Nijenhuis, S.M.; Prange, Grada Berendina; Rahman, N.; Sale, P.; Schätzlein, F.; van Schooten, B.; Stienen, Arno

    2014-01-01

    Objective: this manuscript introduces the Supervised Care and Rehabilitation Involving Personal Tele-robotics (SCRIPT) project. The main goal is to demonstrate design and development steps involved in a complex intervention, while examining feasibility of using an instrumented orthotic device for

  10. Deployment Repeatability

    Science.gov (United States)

    2016-08-31

    large cohort of trials to spot unusual cases. However, deployment repeatability is inherently a nonlinear phenomenon, which makes modeling difficult...and GEMS tip position were both tracked during ground testing by a laser target tracking system. Earlier SAILMAST testing in 2005 [8] used...recalls the strategy used by SRTM, where a constellation of lights was installed at the tip of the boom and a modified star tracker was used to track tip

  11. Opportunity, risk, and success recognizing, addressing, and balancing multiple factors crucial to the success of a project management system deployed to support multi-lateral decommissioning programs

    International Nuclear Information System (INIS)

    Funk, Greg; Longsworth, Paul

    2007-01-01

    This paper addresses the factors involved in effectively implementing a world-class program/project management information system funded by multiple nations. Along with many other benefits, investing in and utilizing such systems improves delivery and drive accountability for major expenditures. However, there are an equally large number of impediments to developing and using such systems. To be successful, the process requires a dynamic combining of elements and strategic sequencing of initiatives. While program/project-management systems involve information technologies, software and hardware, they represent only one element of the overall system.. Technology, process, people and knowledge must all be integrated and working in concert with one another to assure a fully capable system. Major system implementations occur infrequently, and frequently miss established targets in relatively small organizations (with the risk increasing with greater complexity). The European Bank of Reconstruction (EBRD) is midway through just such an implementation. The EBRD is using funds from numerous donor countries to sponsor development of an overarching program management system. The system will provide the Russian Federation with the tools to effectively manage prioritizing, planning, and physically decommissioning assets i n northwest Russia to mitigate risks associated the Soviet era nuclear submarine program. Project-management delivery using world-class techniques supported by aligned systems has been proven to increase the probability of delivering on-time and on-budget, assuring those funding such programs optimum value for money. However, systems deployed to manage multi-laterally funded projects must be developed with appropriate levels of consideration given to unique aspects such as: accommodation of existing project management methods, consideration for differences is management structures and organizational behaviors, incorporation of unique strengths, and subtle

  12. Advanced Deployable Structural Systems for Small Satellites

    Science.gov (United States)

    Belvin, W. Keith; Straubel, Marco; Wilkie, W. Keats; Zander, Martin E.; Fernandez, Juan M.; Hillebrandt, Martin F.

    2016-01-01

    One of the key challenges for small satellites is packaging and reliable deployment of structural booms and arrays used for power, communication, and scientific instruments. The lack of reliable and efficient boom and membrane deployment concepts for small satellites is addressed in this work through a collaborative project between NASA and DLR. The paper provides a state of the art overview on existing spacecraft deployable appendages, the special requirements for small satellites, and initial concepts for deployable booms and arrays needed for various small satellite applications. The goal is to enhance deployable boom predictability and ground testability, develop designs that are tolerant of manufacturing imperfections, and incorporate simple and reliable deployment systems.

  13. California Plug-In Electric Vehicle Infrastructure Projections: 2017-2025 - Future Infrastructure Needs for Reaching the State's Zero Emission-Vehicle Deployment Goals

    Energy Technology Data Exchange (ETDEWEB)

    Wood, Eric W [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Rames, Clement L [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Bedir, Abdulkadir [California Energy Commission; Crisostomo, Noel [California Energy Commission; Allen, Jennifer [California Energy Commission

    2018-03-27

    This report analyzes plug-in electric vehicle (PEV) infrastructure needs in California from 2017 to 2025 in a scenario where the State's zero-emission vehicle (ZEV) deployment goals are achieved by household vehicles. The statewide infrastructure needs are evaluated by using the Electric Vehicle Infrastructure Projection tool, which incorporates representative statewide travel data from the 2012 California Household Travel Survey. The infrastructure solution presented in this assessment addresses two primary objectives: (1) enabling travel for battery electric vehicles and (2) maximizing the electric vehicle-miles traveled for plug-in hybrid electric vehicles. The analysis is performed at the county-level for each year between 2017 and 2025 while considering potential technology improvements. The results from this study present an infrastructure solution that can facilitate market growth for PEVs to reach the State's ZEV goals by 2025. The overall results show a need for 99k-130k destination chargers, including workplaces and public locations, and 9k-25k fast chargers. The results also show a need for dedicated or shared residential charging solutions at multi-family dwellings, which are expected to host about 120k PEVs by 2025. An improvement to the scientific literature, this analysis presents the significance of infrastructure reliability and accessibility on the quantification of charger demand.

  14. Rapid deployment intrusion detection system

    International Nuclear Information System (INIS)

    Graham, R.H.

    1997-01-01

    A rapidly deployable security system is one that provides intrusion detection, assessment, communications, and annunciation capabilities; is easy to install and configure; can be rapidly deployed, and is reusable. A rapidly deployable intrusion detection system (RADIDS) has many potential applications within the DOE Complex: back-up protection for failed zones in a perimeter intrusion detection and assessment system, intrusion detection and assessment capabilities in temporary locations, protection of assets during Complex reconfiguration, and protection in hazardous locations, protection of assets during Complex reconfiguration, and protection in hazardous locations. Many DOE user-need documents have indicated an interest in a rapidly deployable intrusion detection system. The purpose of the RADIDS project is to design, develop, and implement such a system. 2 figs

  15. Quality function deployment

    International Nuclear Information System (INIS)

    1981-10-01

    This book indicates quality function deployment with quality and deployment of quality function, process and prospect of quality function deployment and development, product process and conception of quality table, deployment of quality demand, design of quality table and application of concurrent multi design, progress design and quality development, main safe part and management of important function part, quality development and deployment of method of construction, quality deployment and economics, total system of quality function deployment and task of quality function deployment in the present and future.

  16. Structural Analysis of Components of the Students for the Exploration and Development of Space Satellite (SEDSAT) for the Small Expendable Deployer System (SEDS) Project Office

    Science.gov (United States)

    Maddux, Gary A.

    1998-01-01

    During the time frame allocated by the delivery order, members of the UAH Applied Research Program, with the cooperation of representatives from NASA investigated and conducted stress analysis of the SEDSAT1 satellite. The main area of concern was with the design of the deployable 10 m antennas. The placement of the holes for the antenna door hinge pin was too close to the edge of the antenna canister. Because of the load placed on the hinge pin, the stress analysis of this area suggested that more space would be needed between the holes and the edge of the material. Due to other conflicts, SEDSATI was removed from flying on the space shuttle and moved to the Delta Launch Vehicle. This changed many of the design requirements for the mounting and deployment of the satellite that forced a new design for the satellite. Once this happened, the stress analysis became obsolete, and the task was concluded.

  17. A NATO Guide for Assessing Deployability for Military Personnel with Medical Conditions (Guide OTAN d’evaluation de l’aptitude medicale a la projection du personnel militaire)

    Science.gov (United States)

    2014-06-01

    beyond control by self-care. 4) No periodontally involved teeth with untreated associated apical involvement. When treated, teeth show both...unacceptable in personnel subjected to barometric pressure changes (i.e. pilots, divers, HALO jumpers). 3) No evidence of active periodontal disease that is...performance; AND • No requirement for physician follow-up in next 6 months. Low Risk – May Deploy • Currently asymptomatic with normal kidney function

  18. Solar sail deployment experiment

    OpenAIRE

    Shimose, Shigeru; 下瀬 滋

    2006-01-01

    Solar Sail move by receiving momentum of photons in sunlight. This paper presents results of some Spin-Stabilized Solar Sail deployment experiment. ISAS has successfully deployed, for the first time in the world, the polyimide Solar Sail taking advantage of centrifugal force in space. Based on this result, the new deployment mechanism is being developed which retracts the 50 m diameter sail.

  19. Mastering Windows 7 Deployment

    CERN Document Server

    Finn, Aidan; van Surksum, Kenneth

    2011-01-01

    Get professional-level instruction on Windows 7 deployment tools Enterprise-level operating system deployment is challenging and requires knowledge of specific tools. It is expected that Windows 7 will be extensively deployed in businesses worldwide. This comprehensive Sybex guide provides thorough coverage of the Microsoft deployment tools that were specifically created for Windows 7, preparing system administrators, MIS professionals, and corporate programmers to tackle the task effectively.Companies worldwide are expected to deploy Windows 7 as their enterprise operating system; system admi

  20. Supply strategy for SMR deployment

    International Nuclear Information System (INIS)

    Coccagna, A.F.

    2013-01-01

    This document provides a description of Babcock and Wilcox's deployment strategy for the mPower™ Small Modular Reactor from the perspective of Supply Chain and Manufacturing. A desirable future state of readiness is described as one which leverages and revitalizes an existing supply chain and manufacturing infrastructure, as well as leveraging an existing workforce of engineering, construction, and project management employees. B and W's mPower™ SMR value proposition offers many desired design and operating advantages to the SMR market. (author)

  1. Validation and deployment of the first Lidar based weather observation network in New York State: The NYS MesoNet Project

    Directory of Open Access Journals (Sweden)

    Thobois L.

    2018-01-01

    This paper will describe the New York State Mesonet that is being deployed in the state of New York, USA. It is composed of 126 stations including 17 profiler sites. These sites will acquire continuous upper air observations through the combination of WINDCUBE Lidars and microwave radiometers. These stations will provide temperature, relative humidity & “3D” wind profile measurements through and above the planetary boundary layer (PBL and will retrieve derived atmospheric quantities such as the PBL height, cloud base, momentum fluxes, and aerosol & cloud optical properties. The different modes and configurations that will be used for the Lidars are discussed. The performances in terms of data availability and wind accuracy and precision are evaluated. Several profiles with specific wind and aerosol features are presented to illustrate the benefits of the use of Coherent Doppler Lidars to monitor accurately the PBL.

  2. Rapidly Evolving Distributed Systems by Bridging the Deployment Gap

    National Research Council Canada - National Science Library

    Wolf, Alexander

    2000-01-01

    .... The University of Colorado EDCS project has been successful in achieving its objective: producing innovative, useful, and interesting research results in the areas of software configuration and deployment...

  3. Rapidly Evolving Distributed Systems by Bridging the Deployment Gap

    National Research Council Canada - National Science Library

    Wolf, Alexander

    2001-01-01

    .... The University of Colorado EDCS project has been successful in achieving its objective; producing innovative, useful and interesting research results in the areas of software configuration and deployment...

  4. Tether Deployer And Brake

    Science.gov (United States)

    Carroll, Joseph A.; Alexander, Charles M.

    1993-01-01

    Design concept promises speed, control, and reliability. Scheme for deploying tether provides for fast, free, and snagless payout and fast, dependable braking. Developed for small, expendable tethers in outer space, scheme also useful in laying transoceanic cables, deploying guidance wires to torpedoes and missiles, paying out rescue lines from ship to ship via rockets, deploying antenna wires, releasing communication and power cables to sonobuoys and expendable bathythermographs, and in reeling out lines from fishing rods.

  5. RSOI: Force Deployment Bottleneck

    National Research Council Canada - National Science Library

    D'Amato, Mark

    1998-01-01

    This study uses The Theory Of Constraints (TOC) management methodology and recent military missions to show that RSOI operations are generally the limiting constraint to force deployment operations...

  6. Center for Deployment Psychology

    Data.gov (United States)

    Federal Laboratory Consortium — The Center for Deployment Psychology was developed to promote the education of psychologists and other behavioral health specialists about issues pertaining to the...

  7. Deployment Health Surveillance

    National Research Council Canada - National Science Library

    DeNicola, Anthony D

    2004-01-01

    .... Gulf War health questions have resulted in controversy over potentially hazardous exposures during the deployment, the possibility of adverse affects from preventive health measures, and the role...

  8. Validation and deployment of the first Lidar based weather observation network in New York State: The NYS MesoNet Project

    Science.gov (United States)

    Thobois, L.; Freedman, J.; Royer, P.; Brotzge, J.; Joseph, E.

    2018-04-01

    The number and quality of atmospheric observations used by meteorologists and operational forecasters are increasing year after year, and yet, consistent improvements in forecast skill remains a challenge. While contributing factors involving these challenges have been identified, including the difficulty in accurately establishing initial conditions, improving the observations at regional and local scales is necessary for accurate depiction of the atmospheric boundary layer (below 2km), particularly the wind profile, in high resolution numerical models. Above the uncertainty of weather forecasts, the goal is also to improve the detection of severe and extreme weather events (severe thunderstorms, tornadoes and other mesoscale phenomena) that can adversely affect life, property and commerce, primarily in densely populated urban centers. This paper will describe the New York State Mesonet that is being deployed in the state of New York, USA. It is composed of 126 stations including 17 profiler sites. These sites will acquire continuous upper air observations through the combination of WINDCUBE Lidars and microwave radiometers. These stations will provide temperature, relative humidity & "3D" wind profile measurements through and above the planetary boundary layer (PBL) and will retrieve derived atmospheric quantities such as the PBL height, cloud base, momentum fluxes, and aerosol & cloud optical properties. The different modes and configurations that will be used for the Lidars are discussed. The performances in terms of data availability and wind accuracy and precision are evaluated. Several profiles with specific wind and aerosol features are presented to illustrate the benefits of the use of Coherent Doppler Lidars to monitor accurately the PBL.

  9. Part 8. Deployment considerations

    International Nuclear Information System (INIS)

    Dance, K.D.; Chang, Y.I.; Daly, T.A.

    1980-01-01

    This report addresses considerations of fast breeder reactor development and deployment from a national perspective. Nations vary greatly in their expertise and interest relative to nuclear power, and hence a single set of steps to be taken by a nation in decision-making on breeder development and deployment cannot be presented. The approach taken in this report is to present discussions on key factors influencing the breeder development and deployment decisions, especially in non-breeder nations, by drawing upon historical perspectives of the Light Water Reactor for comparison

  10. Deployment Health Surveillance

    National Research Council Canada - National Science Library

    DeNicola, Anthony D

    2004-01-01

    ... of stress in causing chronic illness. The lack of comprehensive deployment health surveillance has made it difficult to determine possible causes of adverse health effects reported by Gulf War veterans...

  11. Deployable Brake for Spacecraft

    Science.gov (United States)

    Rausch, J. R.; Maloney, J. W.

    1987-01-01

    Aerodynamic shield that could be opened and closed proposed. Report presents concepts for deployable aerodynamic brake. Brake used by spacecraft returning from high orbit to low orbit around Earth. Spacecraft makes grazing passes through atmosphere to slow down by drag of brake. Brake flexible shield made of woven metal or ceramic withstanding high temperatures created by air friction. Stored until needed, then deployed by set of struts.

  12. Industrial deployment of system engineering methods

    CERN Document Server

    Romanovsky, Alexander

    2013-01-01

    A formal method is not the main engine of a development process, its contribution is to improve system dependability by motivating formalisation where useful. This book summarizes the results of the DEPLOY research project on engineering methods for dependable systems through the industrial deployment of formal methods in software development. The applications considered were in automotive, aerospace, railway, and enterprise information systems, and microprocessor design.  The project introduced a formal method, Event-B, into several industrial organisations and built on the lessons learned to

  13. Challenges to Deploy Service Design in Organizations

    DEFF Research Database (Denmark)

    Akasaka, Fumiya; Ohno, Takehiko; Jensen, Mika Yasuoka

    2016-01-01

    More and more companies are applying service design approaches to develop services and products. Not every project, however, has achieved its goals. In many cases, difficulties arise from organizational issues such as organization structure and evaluation system. In this research, we held workshops...... where success and failure factors of service design projects in organization are presented. By analysing the results, we construct a model that explains the “difficulties of deploying the service design approach in organization.” On the basis of the model, this paper discusses the challenges...... to the deployment of the service design approach in organizations....

  14. Connected Vehicle Pilot Deployment Program phase 1 : comprehensive deployment plan : New York City : volume 1 : technical application : part I : technical and management approach.

    Science.gov (United States)

    2016-08-01

    This document describes the Deployment Plan for the New York City Department of Transportation (NYC) Connected Vehicle Pilot Deployment (CVPD) Project. This plan describes the approach to complete Phase 2 Design/Build/Test, and Phase 3 Operate and Ma...

  15. Keys to successful D and D technology deployments at the INEEL

    International Nuclear Information System (INIS)

    Smith, A.M.; Meservey, R. H.; Shoemaker, H.

    2000-01-01

    Seven improved decontamination and decommissioning (DandD) technologies were successfully deployed at the Idaho National Engineering and Environmental Laboratory (INEEL) during the Accelerated Site Technology Deployment (ASTD) Integrated Decontamination and Decommissioning (IDandD) project. The use of these improved technologies saved the INEEL $462K in fiscal year 1999, and is projected to save about $14M over the next ten years. Since deploying new technologies on DandD projects shows great potential for cost-savings, factors that led to successful deployment have been documented. These factors are described here as they apply to the seven deployments at the INEEL to assist with deployments at other DOE sites

  16. Remote Systems Design & Deployment

    Energy Technology Data Exchange (ETDEWEB)

    Bailey, Sharon A.; Baker, Carl P.; Valdez, Patrick LJ

    2009-08-28

    The Pacific Northwest National Laboratory (PNNL) was tasked by Washington River Protection Solutions, LLC (WRPS) to provide information and lessons learned relating to the design, development and deployment of remote systems, particularly remote arm/manipulator systems. This report reflects PNNL’s experience with remote systems and lays out the most important activities that need to be completed to successfully design, build, deploy and operate remote systems in radioactive and chemically contaminated environments. It also contains lessons learned from PNNL’s work experiences, and the work of others in the national laboratory complex.

  17. Deploying Node.js

    CERN Document Server

    Pasquali, Sandro

    2015-01-01

    If you are an intermediate or advanced developer deploying your Node.js applications, then this book is for you. If you have already built a Node application or module and want to take your knowledge to the next level, this book will help you find your way.

  18. Fusion Power Deployment

    International Nuclear Information System (INIS)

    Schmidt, J.A.; Ogden, J.M.

    2002-01-01

    Fusion power plants could be part of a future portfolio of non-carbon dioxide producing energy supplies such as wind, solar, biomass, advanced fission power, and fossil energy with carbon dioxide sequestration. In this paper, we discuss key issues that could impact fusion energy deployment during the last half of this century. These include geographic issues such as resource availability, scale issues, energy storage requirements, and waste issues. The resource needs and waste production associated with fusion deployment in the U.S. should not pose serious problems. One important feature of fusion power is the fact that a fusion power plant should be locatable within most local or regional electrical distribution systems. For this reason, fusion power plants should not increase the burden of long distance power transmission to our distribution system. In contrast to fusion power, regional factors could play an important role in the deployment of renewable resources such as wind, solar and biomass or fossil energy with CO2 sequestration. We examine the role of these regional factors and their implications for fusion power deployment

  19. White Paper on Dish Stirling Technology: Path Toward Commercial Deployment

    Energy Technology Data Exchange (ETDEWEB)

    Andraka, Charles E. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States). Concentrating Solar Power Dept.; Stechel, Ellen [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States). Concentrating Solar Power Dept.; Becker, Peter [Stirling Energy Systems, Scottsdale, AZ (United States); Messick, Brian [Stirling Energy Systems, Scottsdale, AZ (United States)

    2016-07-01

    Dish Stirling energy systems have been developed for distributed and large-scale utility deployment. This report summarizes the state of the technology in a joint project between Stirling Energy Systems, Sandia National Laboratories, and the Department of Energy in 2011. It then lays out a feasible path to large scale deployment, including development needs and anticipated cost reduction paths that will make a viable deployment product.

  20. Deployment of Intelligent Transportation Systems: A Summary of the 2016 National Survey Results

    Science.gov (United States)

    2018-03-01

    This report presents summary results of the 2016 ITS Deployment Tracking survey, the most recent survey conducted through the ITS Deployment Tracking Project. The U.S. Department of Transportation and the ITS Joint Program Office have pursued a resea...

  1. Large Deployable Reflector (LDR)

    Science.gov (United States)

    Alff, W. H.

    1980-01-01

    The feasibility and costs were determined for a 1 m to 30 m diameter ambient temperature, infrared to submillimeter orbiting astronomical telescope which is to be shuttle-deployed, free-flying, and have a 10 year orbital life. Baseline concepts, constraints on delivery and deployment, and the sunshield required are examined. Reflector concepts, the optical configuration, alignment and pointing, and materials are also discussed. Technology studies show that a 10 m to 30 m diameter system which is background and diffraction limited at 30 micron m is feasible within the stated time frame. A 10 m system is feasible with current mirror technology, while a 30 m system requires technology still in development.

  2. Deployable reflector configurations

    Science.gov (United States)

    Meinel, A. B.; Meinel, M. P.; Woolf, N. J.

    Both the theoretical reasons for considering a non-circular format for the Large Deployable Reflector, and a potentially realizable concept for such a device, are discussed. The optimum systems for diffraction limited telescopes with incoherent detection have either a single filled aperture, or two such apertures as an interferometer to synthesize a larger aperture. For a single aperture of limited area, a reflector in the form of a slot can be used to give increased angular resolution. It is shown how a 20 x 8 meter telescope can be configured to fit the Space Shuttle bay, and deployed with relatively simple operations. The relationship between the sunshield design and the inclination of the orbit is discussed. The possible use of the LDR as a basic module to permit the construction of supergiant space telescopes and interferometers both for IR/submm studies and for the entire ultraviolet through mm wave spectral region is discussed.

  3. Treatment Deployment Evaluation Tool

    International Nuclear Information System (INIS)

    M. A. Rynearson; M. M. Plum

    1999-01-01

    The U.S. Department of Energy (DOE) is responsible for the final disposition of legacy spent nuclear fuel (SNF). As a response, DOE's National Spent Nuclear Fuel Program (NSNFP) has been given the responsibility for the disposition of DOE-owned SNF. Many treatment technologies have been identified to treat some forms of SNF so that the resulting treated product is acceptable by the disposition site. One of these promising treatment processes is the electrometallurgical treatment (EMT) currently in development; a second is an Acid Wash Decladding process. The NSNFP has been tasked with identifying possible strategies for the deployment of these treatment processes in the event that a treatment path is deemed necessary. To support the siting studies of these strategies, economic evaluations are being performed to identify the least-cost deployment path. This model (tool) was developed to consider the full scope of costs, technical feasibility, process material disposition, and schedule attributes over the life of each deployment alternative. Using standard personal computer (PC) software, the model was developed as a comprehensive technology economic assessment tool using a Life-Cycle Cost (LCC) analysis methodology. Model development was planned as a systematic, iterative process of identifying and bounding the required activities to dispose of SNF. To support the evaluation process, activities are decomposed into lower level, easier to estimate activities. Sensitivity studies can then be performed on these activities, defining cost issues and testing results against the originally stated problem

  4. Abstracting application deployment on Cloud infrastructures

    Science.gov (United States)

    Aiftimiei, D. C.; Fattibene, E.; Gargana, R.; Panella, M.; Salomoni, D.

    2017-10-01

    Deploying a complex application on a Cloud-based infrastructure can be a challenging task. In this contribution we present an approach for Cloud-based deployment of applications and its present or future implementation in the framework of several projects, such as “!CHAOS: a cloud of controls” [1], a project funded by MIUR (Italian Ministry of Research and Education) to create a Cloud-based deployment of a control system and data acquisition framework, “INDIGO-DataCloud” [2], an EC H2020 project targeting among other things high-level deployment of applications on hybrid Clouds, and “Open City Platform”[3], an Italian project aiming to provide open Cloud solutions for Italian Public Administrations. We considered to use an orchestration service to hide the complex deployment of the application components, and to build an abstraction layer on top of the orchestration one. Through Heat [4] orchestration service, we prototyped a dynamic, on-demand, scalable platform of software components, based on OpenStack infrastructures. On top of the orchestration service we developed a prototype of a web interface exploiting the Heat APIs. The user can start an instance of the application without having knowledge about the underlying Cloud infrastructure and services. Moreover, the platform instance can be customized by choosing parameters related to the application such as the size of a File System or the number of instances of a NoSQL DB cluster. As soon as the desired platform is running, the web interface offers the possibility to scale some infrastructure components. In this contribution we describe the solution design and implementation, based on the application requirements, the details of the development of both the Heat templates and of the web interface, together with possible exploitation strategies of this work in Cloud data centers.

  5. Patriot PAC-2 Development and Deployment in The Gulf War

    National Research Council Canada - National Science Library

    Sherman, J

    2003-01-01

    .... Patriot PAC-2 is a case study in effective project management that resulted in the extraordinary acceleration in the final stages of development production and deployment in time to play a historic role in the Gulf War...

  6. Moored ADCP current data from deployment 2 of the Multi-disciplinary Ocean Sensors for Environmental Analyses and Networks (MOSEAN) project north of Hawaii 2004-2005 (NODC Accession 0116094)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — ADCP data were collected by sensors from seven deployments within 2004-2007 on the HALE-ALOHA mooring, a location about 100 km north of Oahu, Hawaii, USA. The...

  7. Economics of ALMR deployment

    International Nuclear Information System (INIS)

    Delene, J.G.; Fuller, L.C.; Hudson, C.R.

    1994-01-01

    The Advanced Liquid Metal Reactor (ALMR) has the potential to extend the economic life of the nuclear option and of reducing the number of high level waste repositories which will eventually be needed in an expanding nuclear economy. This paper reports on an analysis which models and evaluates the economics of the use of ALMRs as a component of this country's future electricity generation mix. The ALMR concept has the ability to utilize as fuel the fissile material contained in previously irradiated nuclear fuel (i.e., spent fuel) or from surplus weapons grade material. While not a requirement for the successful deployment of ALMR power plant technology, the reprocessing of spent fuel from light water reactors (LWR) is necessary for any rapid introduction of ALMR power plants. In addition, the reprocessing of LWR spent fuel may reduce the number of high level waste repositories needed in the future by burning the long-lived actinides produced in the fission process. With this study, the relative economics of a number of potential scenarios related to these issues are evaluated. While not encompassing the full range of all possibilities, the cases reported here provide an indication of the potential costs, timings, and relative economic attractiveness of ALMR deployment

  8. ALMR deployment economic analysis

    International Nuclear Information System (INIS)

    Delene, J.G.; Fuller, L.C.; Hudson, C.R.

    1993-06-01

    This analysis seeks to model and evaluate the economics of the use of Advanced Liquid Metal Reactors (ALMR) as a component of this country's future electricity generation mix. The ALMR concept has the ability to utilize as fuel the fissile material contained in previously irradiated nuclear fuel (i.e., spent fuel). While not a requirement for the successful deployment of ALMR power plant technology, the reprocessing of spent fuel from light water reactors (LWR) is necessary for any rapid introduction of ALMR power plants. In addition, the reprocessing of LWR spent fuel may reduce the number of high level waste repositories needed in the future by burning the long-lived actinides produced in the fission process. With this study, the relative economics of a number of potential scenarios related to these issues are evaluated. While not encompassing the full range of all possibilities, the cases reported here provide an indication of the potential costs, timings, and relative economic attractiveness of ALMR deployment

  9. Planning and Management of Technology Deployment Center

    International Nuclear Information System (INIS)

    Park, Jae Won; Joo, Po Kook; Kim, Jun Yeon and others

    2005-08-01

    The R and D contents are summarized as follows ; Models were set-up for transferring the developed technologies to the industry and managing technology deployment center to vitalize the commercialization and then the set-up model was tried to apply for transferring technologies for commercialization and to define interfaces between the R and D and industrial applications In this project, new products and processes were developed for promoting the commercialization. Infra-structures were firmly set-up for the venture company promotion and technology deployment developed during executing the proton Engineering frontier Project. Commercialization methodology connection with industrial companies were studied by outside specializing institute. Development of gem-stone coloring and new photo catalyst producing techniques are very high value-adding technologies, therefore, experimental and theoretical R and D were transacted simultaneously to obtain the originality of the technology. The theoretical R and D was committed to a specialist outside

  10. Quality Function Deployment for Large Systems

    Science.gov (United States)

    Dean, Edwin B.

    1992-01-01

    Quality Function Deployment (QFD) is typically applied to small subsystems. This paper describes efforts to extend QFD to large scale systems. It links QFD to the system engineering process, the concurrent engineering process, the robust design process, and the costing process. The effect is to generate a tightly linked project management process of high dimensionality which flushes out issues early to provide a high quality, low cost, and, hence, competitive product. A pre-QFD matrix linking customers to customer desires is described.

  11. Complex Deployed Responsive Service

    Science.gov (United States)

    Parry, Glenn; McLening, Marc; Caldwell, Nigel; Thompson, Rob

    A pizza restaurant must provide product, in the form of the food and drink, and service in the way this is delivered to the customer. Providing this has distinct operational challenges, but what if the restaurant also provides a home delivery service? The service becomes deployed as the customer is no-longer co-located with the production area. The business challenge is complicated as service needs to be delivered within a geographic region, to time or the pizza will be cold, and within a cost that is not ­prohibitive. It must also be responsive to short term demand; needing to balance the number of staff it has available to undertake deliveries against a forecast of demand.

  12. CCT deployment considerations

    International Nuclear Information System (INIS)

    Yamagata, B.

    1993-01-01

    The deployment of Clean Coal Technologies (CCT) is discussed by asserting that in the case of commercializing CCT, the government's involvement should not stop at the demonstration gate. Two areas in this regard are described. First, the need for the domestic DOE CCT Program to focus on the domestic deployment of demonstrated technologies, and second, the need to recognize that to participate in the phenomenal growth of international power markets through use of clean coal or advanced coal technologies an aggressive partnering between the government and industry to demonstrate technologies abroad will be required. The Clean Coal Technology Coalition's (CCT) primary mission has been to promote the development and use of CCTs. The CCT is a strong advocate for the DOE CCT Program and applauds the Department's and industry's success at developing many coal-based technologies. By current design, the DOE program is said to go no further than the initial demonstration of a technology. Since the inception of CCT in 1986, the Coalition has advocated the need to pursue a partnership with government in which more than one demonstration of the same or similar technology is supported by the clean coal program. Only in this way can one be assured of widespread acceptance of any given technology. There exists a gap (call it a open-quotes risk gapclose quotes) between CCTs that have been successfully demonstrated (and presumably available for commercial use) and their widespread commercial use. A technology matrix has been developed in which the developmental status of a variety of clean coal technologies is demonstrated. While still too early to pass judgment, it appears that while success is being achieved in demonstrating advanced coal technologies, the market place - for several reasons - is not, indeed may have no plans, to adopt these technologies

  13. CMS software deployment on OSG

    International Nuclear Information System (INIS)

    Kim, B; Avery, P; Thomas, M; Wuerthwein, F

    2008-01-01

    A set of software deployment tools has been developed for the installation, verification, and removal of a CMS software release. The tools that are mainly targeted for the deployment on the OSG have the features of instant release deployment, corrective resubmission of the initial installation job, and an independent web-based deployment portal with Grid security infrastructure login mechanism. We have been deploying over 500 installations and found the tools are reliable and adaptable to cope with problems with changes in the Grid computing environment and the software releases. We present the design of the tools, statistics that we gathered during the operation of the tools, and our experience with the CMS software deployment on the OSG Grid computing environment

  14. CMS software deployment on OSG

    Energy Technology Data Exchange (ETDEWEB)

    Kim, B; Avery, P [University of Florida, Gainesville, FL 32611 (United States); Thomas, M [California Institute of Technology, Pasadena, CA 91125 (United States); Wuerthwein, F [University of California at San Diego, La Jolla, CA 92093 (United States)], E-mail: bockjoo@phys.ufl.edu, E-mail: thomas@hep.caltech.edu, E-mail: avery@phys.ufl.edu, E-mail: fkw@fnal.gov

    2008-07-15

    A set of software deployment tools has been developed for the installation, verification, and removal of a CMS software release. The tools that are mainly targeted for the deployment on the OSG have the features of instant release deployment, corrective resubmission of the initial installation job, and an independent web-based deployment portal with Grid security infrastructure login mechanism. We have been deploying over 500 installations and found the tools are reliable and adaptable to cope with problems with changes in the Grid computing environment and the software releases. We present the design of the tools, statistics that we gathered during the operation of the tools, and our experience with the CMS software deployment on the OSG Grid computing environment.

  15. Mastering Hyper-V Deployment

    CERN Document Server

    Finn, Aidan

    2010-01-01

    The only book to take an in-depth look at deploying Hyper-V. Now in its second generation, the popular Hyper-V boasts technical advances that create even more dynamic systems than ever before. This unique resource serves an authoritative guide to deploying Windows Server 2008 R2 Hyper-V comprehensively. Step-by-step instructions demonstrate how to design a Hyper-V deployment, build a Hyper-V host environment, and design a management system with System Center Virtual Machine Manager 2008 R2.: Features real-world examples that show you how to design a Hyper-V deployment, build a Hyper-V host env

  16. Infrastructure Engineering and Deployment Division

    Data.gov (United States)

    Federal Laboratory Consortium — Volpe's Infrastructure Engineering and Deployment Division advances transportation innovation by being leaders in infrastructure technology, including vehicles and...

  17. Deploying HEP applications using Xen and Globus Virtual Workspaces

    International Nuclear Information System (INIS)

    Agarwal, A; Desmarais, R; Gable, I; Grundy, D; P-Brown, D; Seuster, R; Vanderster, D C; Sobie, R; Charbonneau, A; Enge, R

    2008-01-01

    The deployment of HEP applications in heterogeneous grid environments can be challenging because many of the applications are dependent on specific OS versions and have a large number of complex software dependencies. Virtual machine monitors such as Xen could be used to package HEP applications, complete with their execution environments, to run on resources that do not meet their operating system requirements. Our previous work has shown HEP applications running within Xen suffer little or no performance penalty as a result of virtualization. However, a practical strategy is required for remotely deploying, booting, and controlling virtual machines on a remote cluster. One tool that promises to overcome the deployment hurdles using standard grid technology is the Globus Virtual Workspaces project. We describe strategies for the deployment of Xen virtual machines using Globus Virtual Workspace middleware that simplify the deployment of HEP applications

  18. Deployment of a Grid-based Medical Imaging Application

    CERN Document Server

    Amendolia, S R; Frate, C; Gálvez, J; Hassan, W; Hauer, T; Manset, D; McClatchey, R; Odeh, M; Rogulin, D; Solomonides, T; Warren, R

    2005-01-01

    The MammoGrid project has deployed its Service-Oriented Architecture (SOA)-based Grid application in a real environment comprising actual participating hospitals. The resultant setup is currently being exploited to conduct rigorous in-house tests in the first phase before handing over the setup to the actual clinicians to get their feedback. This paper elaborates the deployment details and the experiences acquired during this phase of the project. Finally the strategy regarding migration to an upcoming middleware from EGEE project will be described. This paper concludes by highlighting some of the potential areas of future work.

  19. Deployed Analyst Handbook

    Science.gov (United States)

    2016-06-01

    layered approach to data verification. One should use quality control measures throughout the data management process, from the entry of an initial...intermediate milestones aid in project management and ensure customer satisfaction ).  Communications. One should establish recurrent communication with the...distribution across an area. ......................................71 CAA-2015094 vii Figure 22. Clustered Bars – Illustrate a rank order among

  20. Projectables

    DEFF Research Database (Denmark)

    Rasmussen, Troels A.; Merritt, Timothy R.

    2017-01-01

    CNC cutting machines have become essential tools for designers and architects enabling rapid prototyping, model-building and production of high quality components. Designers often cut from new materials, discarding the irregularly shaped remains. We introduce ProjecTables, a visual augmented...... reality system for interactive packing of model parts onto sheet materials. ProjecTables enables designers to (re)use scrap materials for CNC cutting that would have been previously thrown away, at the same time supporting aesthetic choices related to wood grain, avoiding surface blemishes, and other...... relevant material properties. We conducted evaluations of ProjecTables with design students from Aarhus School of Architecture, demonstrating that participants could quickly and easily place and orient model parts reducing material waste. Contextual interviews and ideation sessions led to a deeper...

  1. SMUD Community Renewable Energy Deployment Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Sison-Lebrilla, Elaine [Sacramento Municipal Utility District, Sacramento, CA (United States); Tiangco, Valentino [Sacramento Municipal Utility District, Sacramento, CA (United States); Lemes, Marco [Sacramento Municipal Utility District, Sacramento, CA (United States); Ave, Kathleen [Sacramento Municipal Utility District, Sacramento, CA (United States)

    2015-06-08

    This report summarizes the completion of four renewable energy installations supported by California Energy Commission (CEC) grant number CEC Grant PIR-11-005, the US Department of Energy (DOE) Assistance Agreement, DE-EE0003070, and the Sacramento Municipal Utility District (SMUD) Community Renewable Energy Deployment (CRED) program. The funding from the DOE, combined with funding from the CEC, supported the construction of a solar power system, biogas generation from waste systems, and anaerobic digestion systems at dairy facilities, all for electricity generation and delivery to SMUD’s distribution system. The deployment of CRED projects shows that solar projects and anaerobic digesters can be successfully implemented under favorable economic conditions and business models and through collaborative partnerships. This work helps other communities learn how to assess, overcome barriers, utilize, and benefit from renewable resources for electricity generation in their region. In addition to reducing GHG emissions, the projects also demonstrate that solar projects and anaerobic digesters can be readily implemented through collaborative partnerships. This work helps other communities learn how to assess, overcome barriers, utilize, and benefit from renewable resources for electricity generation in their region.

  2. Deployable Engine Air Brake

    Science.gov (United States)

    2014-01-01

    On approach, next-generation aircraft are likely to have airframe noise levels that are comparable to or in excess of engine noise. ATA Engineering, Inc. (ATA) is developing a novel quiet engine air brake (EAB), a device that generates "equivalent drag" within the engine through stream thrust reduction by creating a swirling outflow in the turbofan exhaust nozzle. Two Phase II projects were conducted to mature this technology: (1) a concept development program (CDP) and (2) a system development program (SDP).

  3. Non-Economic Obstacles to Wind Deployment: Issues and Regional Differences (Presentation)

    Energy Technology Data Exchange (ETDEWEB)

    Baring-Gould, I.

    2014-05-01

    This presentation provides an overview of national obstacles to wind deployment, with regional assessments. A special mention of offshore projects and distributed wind projects is provided. Detailed maps examine baseline capacity, military and flight radar, golden and bald eagle habitat, bat habitat, whooping crane habitat, and public lands. Regional deployment challenges are also discussed.

  4. Stochastic Energy Deployment System

    Energy Technology Data Exchange (ETDEWEB)

    2011-11-30

    SEDS is an economy-wide energy model of the U.S. The model captures dynamics between supply, demand, and pricing of the major energy types consumed and produced within the U.S. These dynamics are captured by including: the effects of macroeconomics; the resources and costs of primary energy types such as oil, natural gas, coal, and biomass; the conversion of primary fuels into energy products like petroleum products, electricity, biofuels, and hydrogen; and lastly the end- use consumption attributable to residential and commercial buildings, light and heavy transportation, and industry. Projections from SEDS extend to the year 2050 by one-year time steps and are generally projected at the national level. SEDS differs from other economy-wide energy models in that it explicitly accounts for uncertainty in technology, markets, and policy. SEDS has been specifically developed to avoid the computational burden, and sometimes fruitless labor, that comes from modeling significantly low-level details. Instead, SEDS focuses on the major drivers within the energy economy and evaluates the impact of uncertainty around those drivers.

  5. Family Reintegration Following Guard Deployment

    Science.gov (United States)

    2010-09-20

    Somalia Peacekeepers. Journal of Consulting and Clinical Psychology, 72(5), 909-913. Haas DM . Pazdernik LA. Olsen CH. A cross-sectional survey of the...relationship between partner deployment and stress in pregnancy during wartime. Haas DM . Pazdernik LA. Partner deployment and stress in pregnant...Identify 3-5 key words relating to the proposal. (Required) I used MESH Headings instead of the CRISP Thesaurus for key

  6. IRIS. Progress in licensing and toward deployment

    International Nuclear Information System (INIS)

    Petrovic, B.; Carelli, M.D.; Kling, C.L.; Cavlina, N.; Grgic, D.

    2006-01-01

    The International Reactor Innovative and Secure (IRIS) is an advanced, integral, light water cooled, pressurized reactor of smaller generating capacity (1000 MWt, or 335 MWe). It is being developed through a strong international partnership by a team lead by Westinghouse and including organizations from 10 countries. The main objective of the project is to offer a simple nuclear power plant with outstanding safety, attractive economics and enhanced proliferation resistance characteristics ready for deployment within the next decade. IRIS embodies the requirements set forth by the recently announced US DOE Global Nuclear Energy Partnership (GNEP) program for worldwide deployment of a smaller-scale reactors and provides a viable bridge to Generation IV reactors. IRIS is designed to address the needs of both developed and emerging markets. Its smaller power level provides deployment flexibility in larger developed markets, and makes it in particular well suited for markets with limited grids or where the annual energy demand growth is moderate. Due to its short construction time and the staggered build option, IRIS significantly reduces the required financing, improves cash flow, and provides a viable solution for economies with limited resources. While based on proven and worldwide accepted LWR technology, IRIS introduces a number of innovative solutions to simplify its design and improve safety and operational characteristics, including the integral primary system and its components, as well as the safety-by-design approach. These features will be tested and demonstrated in a testing program that has been initiated. As its centerpiece, the program will include the integral test facility. Results of this program will support licensing with the US NRC. A multinational licensing is considered to facilitate worldwide deployment. (author)

  7. Accelerating the deployment of offshore renewable energy technologies. Final Report

    Energy Technology Data Exchange (ETDEWEB)

    MacDonald, Mott

    2011-02-15

    Offshore wind energy and ocean energy (i.e. wave and tidal) are at different stages of technology development and deployment, and, as such, they require different approaches for successful deployment. However, regardless of their deployment stage, these technologies may face common hurdles in their way to market competitiveness. IEA-RETD has completed a study with the overall objective to assist policy makers and project developers in a better understanding of these barriers and the specifics of offshore renewable energy and to give them practical guidelines. These include an offshore energy deployment framework, substantiated by evidence-based analyses, and recommendations for future policies design, including best practices for allocation of seafloor rights.

  8. Deployment Effects of Marin Renewable Energy Technologies

    Energy Technology Data Exchange (ETDEWEB)

    Brian Polagye; Mirko Previsic

    2010-06-17

    Given proper care in siting, design, deployment, operation and maintenance, marine and hydrokinetic technologies could become one of the more environmentally benign sources of electricity generation. In order to accelerate the adoption of these emerging hydrokinetic and marine energy technologies, navigational and environmental concerns must be identified and addressed. All developing hydrokinetic projects involve a wide variety of stakeholders. One of the key issues that site developers face as they engage with this range of stakeholders is that many of the possible conflicts (e.g., shipping and fishing) and environmental issues are not well-understood, due to a lack of technical certainty. In September 2008, re vision consulting, LLC was selected by the Department of Energy (DoE) to apply a scenario-based approach to the emerging wave and tidal technology sectors in order to evaluate the impact of these technologies on the marine environment and potentially conflicting uses. The project’s scope of work includes the establishment of baseline scenarios for wave and tidal power conversion at potential future deployment sites. The scenarios will capture variations in technical approaches and deployment scales to properly identify and characterize environmental impacts and navigational effects. The goal of the project is to provide all stakeholders with an improved understanding of the potential effects of these emerging technologies and focus all stakeholders onto the critical issues that need to be addressed. This groundwork will also help in streamlining siting and associated permitting processes, which are considered key hurdles for the industry’s development in the U.S. today. Re vision is coordinating its efforts with two other project teams funded by DoE which are focused on regulatory and navigational issues. The results of this study are structured into three reports: 1. Wave power scenario description 2. Tidal power scenario description 3. Framework for

  9. Modular VO oriented Java EE service deployer

    Science.gov (United States)

    Molinaro, Marco; Cepparo, Francesco; De Marco, Marco; Knapic, Cristina; Apollo, Pietro; Smareglia, Riccardo

    2014-07-01

    The International Virtual Observatory Alliance (IVOA) has produced many standards and recommendations whose aim is to generate an architecture that starts from astrophysical resources, in a general sense, and ends up in deployed consumable services (that are themselves astrophysical resources). Focusing on the Data Access Layer (DAL) system architecture, that these standards define, in the last years a web based application has been developed and maintained at INAF-OATs IA2 (Italian National institute for Astrophysics - Astronomical Observatory of Trieste, Italian center of Astronomical Archives) to try to deploy and manage multiple VO (Virtual Observatory) services in a uniform way: VO-Dance. However a set of criticalities have arisen since when the VO-Dance idea has been produced, plus some major changes underwent and are undergoing at the IVOA DAL layer (and related standards): this urged IA2 to identify a new solution for its own service layer. Keeping on the basic ideas from VO-Dance (simple service configuration, service instantiation at call time and modularity) while switching to different software technologies (e.g. dismissing Java Reflection in favour of Enterprise Java Bean, EJB, based solution), the new solution has been sketched out and tested for feasibility. Here we present the results originating from this test study. The main constraints for this new project come from various fields. A better homogenized solution rising from IVOA DAL standards: for example the new DALI (Data Access Layer Interface) specification that acts as a common interface system for previous and oncoming access protocols. The need for a modular system where each component is based upon a single VO specification allowing services to rely on common capabilities instead of homogenizing them inside service components directly. The search for a scalable system that takes advantage from distributed systems. The constraints find answer in the adopted solutions hereafter sketched. The

  10. Verification Test for Ultra-Light Deployment Mechanism for Sectioned Deployable Antenna Reflectors

    Science.gov (United States)

    Zajac, Kai; Schmidt, Tilo; Schiller, Marko; Seifart, Klaus; Schmalbach, Matthias; Scolamiero, Lucio

    2013-09-01

    The ultra-light deployment mechanism (UDM) is based on three carbon fibre reinforced plastics (CFRP) curved tape springs made of carbon fibre / cyanate ester prepregs.In the frame of the activity its space application suitability for the deployment of solid reflector antenna sections was investigated. A projected diameter of the full reflector of 4 m to 7 m and specific mass in the order of magnitude of 2.6kg/m2 was focused for requirement derivation.Extensive verification tests including health checks, environmental and functional tests were carried out with an engineering model to enable representative characterizing of the UDM unit.This paper presents the design and a technical description of the UDM as well as a summary of achieved development status with respect to test results and possible design improvements.

  11. IPv6 deployment and management

    CERN Document Server

    Dooley, Michael

    2013-01-01

    A guide for understanding, deploying, and managing Internet Protocol version 6 The growth of the Internet has created a need for more addresses than are available with Internet Protocol version 4 (IPv4)-the protocol currently used to direct almost all Internet traffic. Internet Protocol version 6 (IPv6)-the new IP version intended to ultimately succeed IPv4-will expand the addressing capacity of the Internet to support the explosive growth of users and devices on the Internet as well as add flexibility to allocating addresses and efficiency for routing traffic. IPv6 Deploy

  12. Financial Services and the Deployment of Agricultural Innovations in ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    As partners of farmers' associations and small agri-businesses, financial cooperatives can play an important role in the adoption of agricultural innovations by providing relevant financial services. This project will test the ability of financial services to support the deployment and large-scale adoption of innovations ...

  13. Wind Energy Deployment Process and Siting Tools (Presentation)

    Energy Technology Data Exchange (ETDEWEB)

    Tegen, S.

    2015-02-01

    Regardless of cost and performance, some wind projects cannot proceed to completion as a result of competing multiple uses or siting considerations. Wind energy siting issues must be better understood and quantified. DOE tasked NREL researchers with depicting the wind energy deployment process and researching development considerations. This presentation provides an overview of these findings and wind siting tools.

  14. When Loved Ones Get Deployed

    Science.gov (United States)

    ... different from hearing about conflicts and violence that break out in the world during our own time. If someone you care about is in the military and is deployed for duty, it's natural to worry about their safety. That's especially true if the person is going ...

  15. Non-traditional Infrasound Deployment

    Science.gov (United States)

    McKenna, M. H.; McComas, S.; Simpson, C. P.; Diaz-Alvarez, H.; Costley, R. D.; Hayward, C.; Golden, P.; Endress, A.

    2017-12-01

    Historically, infrasound arrays have been deployed in rural environments where anthropological noise sources are limited. As interest in monitoring low energy sources at local distances grows in the infrasound community, it will be vital to understand how to monitor infrasound sources in an urban environment. Arrays deployed in urban centers have to overcome the decreased signal-to-noise ratio and reduced amount of real estate available to deploy an array. To advance the understanding of monitoring infrasound sources in urban environments, local and regional infrasound arrays were deployed on building rooftops on the campus at Southern Methodist University (SMU), and data were collected for one seasonal cycle. The data were evaluated for structural source signals (continuous-wave packets), and when a signal was identified, the back azimuth to the source was determined through frequency-wavenumber analysis. This information was used to identify hypothesized structural sources; these sources were verified through direct measurement and dynamic structural analysis modeling. In addition to the rooftop arrays, a camouflaged infrasound sensor was installed on the SMU campus and evaluated to determine its effectiveness for wind noise reduction. Permission to publish was granted by Director, Geotechnical and Structures Laboratory.

  16. SATWG networked quality function deployment

    Science.gov (United States)

    Brown, Don

    1992-01-01

    The initiative of this work is to develop a cooperative process for continual evolution of an integrated, time phased avionics technology plan that involves customers, technologists, developers, and managers. This will be accomplished by demonstrating a computer network technology to augment the Quality Function Deployment (QFD). All results are presented in viewgraph format.

  17. Solar Photovoltaic Financing: Deployment by Federal Government Agencies

    Energy Technology Data Exchange (ETDEWEB)

    Cory, K.; Coggeshall, C.; Coughlin, J.; Kreycik, C.

    2009-07-01

    The goal of this report is to examine how federal agencies can finance on-site PV projects. It explains state-level cash incentives available, the importance of solar renewable energy certificate revenues (in certain markets), existing financing structures, as well as innovative financing structures being used by federal agencies to deploy on-site PV. Specific examples from the DOD, DOE, and other federal agencies are highlighted to explain federal project financing in detail.

  18. Software, component, and service deployment in computational Grids

    International Nuclear Information System (INIS)

    von Laszewski, G.; Blau, E.; Bletzinger, M.; Gawor, J.; Lane, P.; Martin, S.; Russell, M.

    2002-01-01

    Grids comprise an infrastructure that enables scientists to use a diverse set of distributed remote services and resources as part of complex scientific problem-solving processes. We analyze some of the challenges involved in deploying software and components transparently in Grids. We report on three practical solutions used by the Globus Project. Lessons learned from this experience lead us to believe that it is necessary to support a variety of software and component deployment strategies. These strategies are based on the hosting environment

  19. Quantifying and Understanding Effects from Wildlife, Radar, and Public Engagement on Future Wind Deployment

    Energy Technology Data Exchange (ETDEWEB)

    Tegen, Suzanne

    2017-05-24

    This presentation provides an overview of findings from a report published in 2016 by researchers at the National Renewable Energy Laboratory, An Initial Evaluation of Siting Considerations on Current and Future Wind Deployment. The presentation covers the background for research, the Energy Department's Wind Vision, research methods, siting considerations, the wind project deployment process, and costs associated with siting considerations.

  20. Novel large deployable antenna backing structure concepts for foldable reflectors

    Science.gov (United States)

    Fraux, V.; Lawton, M.; Reveles, J. R.; You, Z.

    2013-12-01

    This paper describes a number of large deployable antenna (LDA) reflector structure concepts developed at EnerSys-ABSL. Furthermore, EnerSys-ABSL has confirmed the desire to build a breadboard demonstrator of a backing deployable structure for a foldable reflector in the diameter range of 4-9 m. As part of this project EnerSys-ABSL has explored five novel deployable structure concepts. This paper presents the top level definition of these concepts together with the requirements considered in the design and selection of the preferred candidate. These new concepts are described and then compared through a trade-off analysis to identify the most suitable concept that EnerSys-ABSL would like to consider for the breadboard demonstrator. Finally, the kinematics of the chosen concept is described in more detail and future steps in the development process are highlighted.

  1. Connected vehicle pilot deployment program phase 1, concept of operations (ConOps) - New York City.

    Science.gov (United States)

    2016-04-08

    This document describes the Concept of Operations (ConOps) for the New York City Department of Transportation (NYC) Connected Vehicle Pilot Deployment (CVPD) Project. This ConOps describes the current state of operations, establishes the reasons for ...

  2. Global Precipitation Measurement (GPM) and International Space Station (ISS) Coordination for Cubesat Deployments

    Science.gov (United States)

    Pawloski, James H.; Aviles, Jorge; Myers, Ralph; Parris, Joshua; Corley, Bryan; Hehn, Garrett; Pascucci, Joseph

    2016-01-01

    This paper describes the specific problem of collision threat to GPM and risk to ISS CubeSat deployment and the process that was implemented to keep both missions safe from collision and maximize their project goals.

  3. Connected Vehicle Pilot Deployment Program phase 1 : security management operating concept : New York City : final report.

    Science.gov (United States)

    2016-05-18

    This document describes the Security Management Operating Concept (SMOC) for the New York City Department of Transportation (NYCDOT) Connected Vehicle Pilot Deployment (CVPD) Project. This SMOC outlines the security mechanisms that will be used to pr...

  4. Gossamer-1: Mission concept and technology for a controlled deployment of gossamer spacecraft

    Science.gov (United States)

    Seefeldt, Patric; Spietz, Peter; Sproewitz, Tom; Grundmann, Jan Thimo; Hillebrandt, Martin; Hobbie, Catherin; Ruffer, Michael; Straubel, Marco; Tóth, Norbert; Zander, Martin

    2017-01-01

    Gossamer structures for innovative space applications, such as solar sails, require technology that allows their controlled and thereby safe deployment. Before employing such technology for a dedicated science mission, it is desirable, if not necessary, to demonstrate its reliability with a Technology Readiness Level (TRL) of six or higher. The aim of the work presented here is to provide reliable technology that enables the controlled deployment and verification of its functionality with various laboratory tests, thereby qualifying the hardware for a first demonstration in low Earth orbit (LEO). The development was made in the Gossamer-1 project of the German Aerospace Center (DLR). This paper provides an overview of the Gossamer-1 mission and hardware development. The system is designed based on the requirements of a technology demonstration mission. The design rests on a crossed boom configuration with triangular sail segments. Employing engineering models, all aspects of the deployment were tested under ambient environment. Several components were also subjected to environmental qualification testing. An innovative stowing and deployment strategy for a controlled deployment, as well as the designs of the bus system, mechanisms and electronics are described. The tests conducted provide insights into the deployment process and allow a mechanical characterization of that deployment process, in particular the measurement of the deployment forces. Deployment on system level could be successfully demonstrated to be robust and controllable. The deployment technology is on TRL four approaching level five, with a qualification model for environmental testing currently being built.

  5. Exploration Augmentation Module Project

    Data.gov (United States)

    National Aeronautics and Space Administration — The Exploration Augmentation Module (EAM) project goal is to design and deliver a flight module that is to be deployed to Earth-Lunar Distant Retrograde Orbit (DRO)....

  6. Cloud Environment Automation: from infrastructure deployment to application monitoring

    Science.gov (United States)

    Aiftimiei, C.; Costantini, A.; Bucchi, R.; Italiano, A.; Michelotto, D.; Panella, M.; Pergolesi, M.; Saletta, M.; Traldi, S.; Vistoli, C.; Zizzi, G.; Salomoni, D.

    2017-10-01

    The potential offered by the cloud paradigm is often limited by technical issues, rules and regulations. In particular, the activities related to the design and deployment of the Infrastructure as a Service (IaaS) cloud layer can be difficult to apply and time-consuming for the infrastructure maintainers. In this paper the research activity, carried out during the Open City Platform (OCP) research project [1], aimed at designing and developing an automatic tool for cloud-based IaaS deployment is presented. Open City Platform is an industrial research project funded by the Italian Ministry of University and Research (MIUR), started in 2014. It intends to research, develop and test new technological solutions open, interoperable and usable on-demand in the field of Cloud Computing, along with new sustainable organizational models that can be deployed for and adopted by the Public Administrations (PA). The presented work and the related outcomes are aimed at simplifying the deployment and maintenance of a complete IaaS cloud-based infrastructure.

  7. RSG Deployment Case Testing Results

    Energy Technology Data Exchange (ETDEWEB)

    Owsley, Stanley L.; Dodson, Michael G.; Hatchell, Brian K.; Seim, Thomas A.; Alexander, David L.; Hawthorne, Woodrow T.

    2005-09-01

    The RSG deployment case design is centered on taking the RSG system and producing a transport case that houses the RSG in a safe and controlled manner for transport. The transport case was driven by two conflicting constraints, first that the case be as light as possible, and second that it meet a stringent list of Military Specified requirements. The design team worked to extract every bit of weight from the design while striving to meet the rigorous Mil-Spec constraints. In the end compromises were made primarily on the specification side to control the overall weight of the transport case. This report outlines the case testing results.

  8. A new deployable structure for the nomad art

    OpenAIRE

    ZHANG, Y; ZHANG, Q

    2005-01-01

    This paper presents a project of the international archtecture and structure competition preparing the annual conference of the IASS 2004 at Montpellier in France. A new kind of depolyable structure is designed to fit the requirements of the nomad art. With a poetical implication and a good assemblage and dismantling, this deployable structure needs an ordered construction procedure. During structure analysis, two phases have been distinguished : the construction phase and the working phase. ...

  9. Reintegration Difficulty of Military Couples Following Deployment

    Science.gov (United States)

    2016-07-01

    Response rate for Wave 8 = 88% Our final sample contained 554 men and 556 women (n = 554 cross- sex couples, 1 same- sex couple). Individuals were...story in the Killeen Daily Herald (10 April 2016) http://kdhnews.com/news/local/ kids -deployments-when-a-parent-deploys-children-face- tough...years old), and (c) “Me getting sick and having to go to sick call.” (deployed Army husband, 25 years old). Sex and fidelity. Comments fell into

  10. Security Support in Continuous Deployment Pipeline

    DEFF Research Database (Denmark)

    Ullah, Faheem; Raft, Adam Johannes; Shahin, Mojtaba

    2017-01-01

    Continuous Deployment (CD) has emerged as a new practice in the software industry to continuously and automatically deploy software changes into production. Continuous Deployment Pipeline (CDP) supports CD practice by transferring the changes from the repository to production. Since most of the CDP...... penetration tools. Our findings indicate that the applied tactics improve the security of the major components (i.e., repository, continuous integration server, main server) of a CDP by controlling access to the components and establishing secure connections....

  11. Strategies for Power Line Communications Smart Metering Network Deployment

    Directory of Open Access Journals (Sweden)

    Alberto Sendin

    2014-04-01

    Full Text Available Smart Grids are becoming a reality all over the world. Nowadays, the research efforts for the introduction and deployment of these grids are mainly focused on the development of the field of Smart Metering. This emerging application requires the use of technologies to access the significant number of points of supply (PoS existing in the grid, covering the Low Voltage (LV segment with the lowest possible costs. Power Line Communications (PLC have been extensively used in electricity grids for a variety of purposes and, of late, have been the focus of renewed interest. PLC are really well suited for quick and inexpensive pervasive deployments. However, no LV grid is the same in any electricity company (utility, and the particularities of each grid evolution, architecture, circumstances and materials, makes it a challenge to deploy Smart Metering networks with PLC technologies, with the Smart Grid as an ultimate goal. This paper covers the evolution of Smart Metering networks, together with the evolution of PLC technologies until both worlds have converged to project PLC-enabled Smart Metering networks towards Smart Grid. This paper develops guidelines over a set of strategic aspects of PLC Smart Metering network deployment based on the knowledge gathered on real field; and introduces the future challenges of these networks in their evolution towards the Smart Grid.

  12. Low Mass Aeroshell Deployment Mechanism, Phase I

    Data.gov (United States)

    National Aeronautics and Space Administration — Cornerstone Research Group Inc. (CRG) will develop new shape memory polymer (SMP) deployment mechanisms for actuating thermal protective systems (TPS) panels to...

  13. Low Mass Aeroshell Deployment Mechanism, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — Cornerstone Research Group Inc. (CRG) will develop new shape memory polymer (SMP) deployment mechanisms for actuating thermal protection system (TPS) panels to...

  14. Development, deployment and operations of ATLAS databases

    International Nuclear Information System (INIS)

    Vaniachine, A. V.; von der Schmitt, J. G.

    2008-01-01

    In preparation for ATLAS data taking, a coordinated shift from development towards operations has occurred in ATLAS database activities. In addition to development and commissioning activities in databases, ATLAS is active in the development and deployment (in collaboration with the WLCG 3D project) of the tools that allow the worldwide distribution and installation of databases and related datasets, as well as the actual operation of this system on ATLAS multi-grid infrastructure. We describe development and commissioning of major ATLAS database applications for online and offline. We present the first scalability test results and ramp-up schedule over the initial LHC years of operations towards the nominal year of ATLAS running, when the database storage volumes are expected to reach 6.1 TB for the Tag DB and 1.0 TB for the Conditions DB. ATLAS database applications require robust operational infrastructure for data replication between online and offline at Tier-0, and for the distribution of the offline data to Tier-1 and Tier-2 computing centers. We describe ATLAS experience with Oracle Streams and other technologies for coordinated replication of databases in the framework of the WLCG 3D services

  15. Concurrent engineering: effective deployment strategies

    Directory of Open Access Journals (Sweden)

    Unny Menon

    1996-12-01

    Full Text Available This paper provides a comprehensive insight into current trends and developments in Concurrent Engineering for integrated development of products and processes with the goal of completing the entire cycle in a shorter time, at lower overall cost and with fewer engineering design changes after product release. The evolution and definition of Concurrent Engineering are addressed first, followed by a concise review of the following elements of the concurrent engineering approach to product development: Concept Development: The Front-End Process, identifying Customer Needs and Quality Function Deployment, Establishing Product Specifications, Concept Selection, Product Architecture, Design for Manufacturing, Effective Rapid Prototyping, and The Economics of Product Development. An outline of a computer-based tutorial developed by the authors and other graduate students funded by NASA ( accessible via the world-wide-web . is provided in this paper. A brief discussion of teamwork for successful concurrent engineering is included, t'ase histories of concurrent engineering implementation at North American and European companies are outlined with references to textbooks authored by Professor Menon and other writers. A comprehensive bibliography on concurrent engineering is included in the paper.

  16. Reintegration Difficulty of Military Couples Following Deployment

    Science.gov (United States)

    2017-07-01

    reintegration. Communication and Generalized Anxiety The emotional cycle of deployment model provides a descrip- tive framework for understanding the...counseling. Thus, communication can have a reciprocal influence on the very appraisals and emotions that motivate interaction in the first place. Communication...of service members back into family life after deployment can be extremely challenging for military couples. Understanding the factors that

  17. 5-Beam ADCP Deployment Strategy Considerations

    Science.gov (United States)

    Moore, T.; Savidge, D. K.; Gargett, A.

    2016-02-01

    With the increasing availability of 5 beam ADCPs and expanding opportunities for their deployment within both observatory and dedicated process study settings, refinements in deployment strategies are needed.Measuring vertical velocities directly with a vertically oriented acoustic beam requires that the instrument be stably mounted and leveled within fractions of a degree. Leveled shallow water deployments to date have utilized divers to jet pipes into the sand for stability, manually mount the instruments on the pipes, and level them. Leveling has been guided by the deployed instrument's pitch and roll output, available in real-time because of the observatory settings in which the deployments occurred. To expand the range of feasible deployments to deeper, perhaps non-real-time capable settings, alternatives to diver deployment and leveling must be considered. To determine stability requirements, mooring motion (heading, pitch and roll) has been sampled at 1Hz by gimballed ADCPs at a range of instrument deployment depths, and in shrouded and unshrouded cages. Conditions under which ADCP cages resting on the bottom experience significant shifts in tilt, roll or heading are assessed using co-located wind and wave measurements. The accuracy of estimating vertical velocities using all five beams relative to a well leveled vertical single beam is assessed from archived high frequency five beam data, to explore whether easing the leveling requirement is feasible.

  18. Renewable Energy: Policy Considerations for Deploying Renewables

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2011-07-01

    This information paper accompanies the IEA publication Deploying Renewables 2011: Best and Future Policy Practice (IEA, 2011a). It provides more detailed data and analysis on policies for Deploying Renewables, and is intended to complement the main publication. It provides an account of the strategic drivers underpinning renewable energy (RE) technology deployment (energy security, economic development and environment protection) and assesses RE technologies with respect to these drivers, including an estimate of GHG emissions reductions due to RE technologies. The paper also explores the different barriers to deploying renewables at a given stage of market maturity and discusses what tools policy makers can avail of to succeed in removing deployment barriers. An additional topical highlight explores the challenges associated with accelerating the diffusion of RE technologies in developing countries.

  19. Next Generation Campus Network Deployment Project Based on Softswitch

    OpenAIRE

    HU Feng; LIU Ziyan

    2011-01-01

    After analyzing the current networks of Guizhou University,we brought forward a scheme of next generation campus networks based on softswitch technology by choosing SoftX3000 switching system of HuaWei and provided the specific solution of accessing campus networks in this paper. It is proved that this scheme is feasible by using OPNET, which not only accomplished the integration of the PSTN and IP networks but also achieved the combining of voice services and data services.

  20. 15 CFR 292.2 - Training development and deployment projects.

    Science.gov (United States)

    2010-01-01

    ... of the activity, and “customer satisfaction” measures of performance. (6) Management and... clearly defined and the proposal must demonstrate that it understands the population's training needs... implementation mechanisms. The proposal must set forth clearly defined, effective mechanisms for delivery and/or...

  1. Accelerating the deployment of energy efficient and renewable energy technologies in South Africa

    Energy Technology Data Exchange (ETDEWEB)

    Shickman, Kurt [Trust for Conservation Innovation, San Francisco, CA (United States). Global Cool Cities Alliance (GCCA)

    2017-02-13

    Purpose of the project was to accelerate the deployment of energy efficient and renewable energy technologies in South Africa. Activities were undertaken to reduce barriers to deployment by improving product awareness for the South African market; market and policy intelligence for U.S. manufacturers; product/service availability; local technical capacity at the workforce, policymaker and expert levels; and ease of conducting business for these technologies/services in the South African market.

  2. Development of the solar array deployment and drive system for the XTE spacecraft

    Science.gov (United States)

    Farley, Rodger; Ngo, Son

    1995-01-01

    The X-ray Timing Explorer (XTE) spacecraft is a NASA science low-earth orbit explorer-class satellite to be launched in 1995, and is an in-house Goddard Space Flight Center (GSFC) project. It has two deployable aluminum honeycomb solar array wings with each wing being articulated by a single axis solar array drive assembly. This paper will address the design, the qualification testing, and the development problems as they surfaced of the Solar Array Deployment and Drive System.

  3. Rover deployment system for lunar landing mission

    Science.gov (United States)

    Sutoh, Masataku; Hoshino, Takeshi; Wakabayashi, Sachiko

    2017-09-01

    For lunar surface exploration, a deployment system is necessary to allow a rover to leave the lander. The system should be as lightweight as possible and stored retracted when launched. In this paper, two types of retractable deployment systems for lunar landing missions, telescopic- and fold-type ramps, are discussed. In the telescopic-type system, a ramp is stored with the sections overlapping and slides out during deployment. In the fold-type system, it is stored folded and unfolds for the deployment. For the development of these ramps, a design concept study and structural analysis were conducted first. Subsequently, ramp deployment and rover release tests were performed using the developed ramp prototypes. Through these tests, the validity of their design concepts and functions have been confirmed. In the rover release test, it was observed that the developed lightweight ramp was sufficiently strong for a 50-kg rover to descend. This result suggests that this ramp system is suitable for the deployment of a 300-kg-class rover on the Moon, where the gravity is about one-sixth that on Earth. The lightweight and sturdy ramp developed in this study will contribute to both safe rover deployment and increase of lander/rover payload.

  4. Miniature field deployable terahertz source

    Science.gov (United States)

    Mayes, Mark G.

    2006-05-01

    Developments in terahertz sources include compacted electron beam systems, optical mixing techniques, and multiplication of microwave frequencies. Although significant advances in THz science have been achieved, efforts continue to obtain source technologies that are more mobile and suitable for field deployment. Strategies in source development have approached generation from either end of the THz spectrum, from up-conversion of high-frequency microwave to down-conversion of optical frequencies. In this paper, we present the design of a THz source which employs an up-conversion method in an assembly that integrates power supply, electronics, and radiative component into a man-portable unit for situations in which a lab system is not feasible. This unit will ultimately evolve into a ruggedized package suitable for use in extreme conditions, e.g. temporary security check points or emergency response teams, in conditions where THz diagnostics are needed with minimal planning or logistical support. In order to meet design goals of reduced size and complexity, the inner workings of the unit ideally would be condensed into a monolithic active element, with ancillary systems, e.g. user interface and power, coupled to the element. To attain these goals, the fundamental component of our design is a THz source and lens array that may be fabricated with either printed circuit board or wafer substrate. To reduce the volume occupied by the source array, the design employs a metamaterial composed of a periodic lattice of resonant elements. Each resonant element is an LC oscillator, or tank circuit, with inductance, capacitance, and center frequency determined by dimensioning and material parameters. The source array and supporting electronics are designed so that the radiative elements are driven in-phase to yield THz radiation with a high degree of partial coherence. Simulation indicates that the spectral width of operation may be controlled by detuning of critical dimensions

  5. ParaSol - A Novel Deployable Approach for Very Large Ultra-lightweight Solar Arrays, Phase I

    Data.gov (United States)

    National Aeronautics and Space Administration — High power solar arrays with capabilities of >100kW are needed for projected NASA missions. Photovoltaic arrays using deployable membranes with thin cells have...

  6. A stowing and deployment strategy for large membrane space systems on the example of Gossamer-1

    Science.gov (United States)

    Seefeldt, Patric

    2017-09-01

    Deployment systems for innovative space applications such as solar sails require a technique for a controlled and autonomous deployment in space. The deployment process has a strong impact on the mechanism and structural design and sizing. On the example of the design implemented in the Gossamer-1 project of the German Aerospace Center (DLR), such a stowing and deployment process is analyzed. It is based on a combination of zig-zag folding and coiling of triangular sail segments spanned between crossed booms. The deployment geometry and forces introduced by the mechanism considered are explored in order to reveal how the loads are transferred through the membranes to structural components such as the booms. The folding geometry and force progressions are described by function compositions of an inverse trigonometric function with the considered trigonometric function itself. If these functions are evaluated over several periods of the trigonometric function, a non-smooth oscillating curve occurs. Depending on the trigonometric function, these are often vividly described as zig-zag or sawtooth functions. The developed functions are applied to the Gossamer-1 design. The deployment geometry reveals a tendency that the loads are transferred along the catheti of the sail segments and therefore mainly along the boom axes. The load introduced by the spool deployment mechanism is described. By combining the deployment geometry with that load, a prediction of the deployment load progression is achieved. The mathematical description of the stowing and deployment geometry, as well as the forces inflicted by the mechanism provides an understanding of how exactly the membrane deploys and through which edges the deployment forces are transferred. The mathematical analysis also gives an impression of sensitive parameters that could be influenced by manufacturing tolerances or unsymmetrical deployment of the sail segments. While the mathematical model was applied on the design of

  7. EPRI activities in support of new nuclear plant deployment

    International Nuclear Information System (INIS)

    Mulford, T.

    2007-01-01

    This paper describes the challenges to new plant deployment in the United States and discusses the role of the Electric Power Research Institute (EPRI) in efforts to address these challenges. These technical challenges include completing remaining design work, licensing review, and standardization required to ensure that new LWRs are a competitive near-term option. The costs for construction, licensing, and operation of new nuclear plants are uncertain and this uncertainty, along with concerns about construction schedule form a financial challenge to investment. Because the new process for licensing nuclear power plants in the United States has not been fully demonstrated, regulatory concerns also serve as a challenge to near-term commitments to build new nuclear power plants. EPRI is working in concert with utilities and vendors to upgrade certified LWR designs and obtain certification of new LWR designs. Specific technical areas being addressed by EPRI projects include updating the Utility Requirements Document (URD), seismic resolution, radiation protection, radioactive waste management, the development of utility planning tools, and staff optimization. EPRI's key on-going project, the New Plant Deployment Program Model (NPDPM), is designed to help prospective and actual new nuclear plant managers and staff to identify schedule and resource requirements from the point of the decision to build a plant through to the start of commercial operation. This model will describe and organize key activities and assess schedule, activity duration, logic relationships and critical path analysis. The new plant licensing and deployment process is a five to ten year activity representing a significant financial investment that requires coordination with federal and state regulators, designers, architect engineers, and numerous other contributing organizations. Planning is crucial to schedule and budget control. EPRI has also supported projects to quantify the environmental

  8. Hydraulic Hybrid Parcel Delivery Truck Deployment, Testing & Demonstration

    Energy Technology Data Exchange (ETDEWEB)

    Gallo, Jean-Baptiste [Calstart Incorporated, Pasadena, CA (United States)

    2014-03-07

    Although hydraulic hybrid systems have shown promise over the last few years, commercial deployment of these systems has primarily been limited to Class 8 refuse trucks. In 2005, the Hybrid Truck Users Forum initiated the Parcel Delivery Working Group including the largest parcel delivery fleets in North America. The goal of the working group was to evaluate and accelerate commercialization of hydraulic hybrid technology for parcel delivery vehicles. FedEx Ground, Purolator and United Parcel Service (UPS) took delivery of the world’s first commercially available hydraulic hybrid parcel delivery trucks in early 2012. The vehicle chassis includes a Parker Hannifin hydraulic hybrid drive system, integrated and assembled by Freightliner Custom Chassis Corp., with a body installed by Morgan Olson. With funding from the U.S. Department of Energy, CALSTART and its project partners assessed the performance, reliability, maintainability and fleet acceptance of three pre-production Class 6 hydraulic hybrid parcel delivery vehicles using information and data from in-use data collection and on-road testing. This document reports on the deployment of these vehicles operated by FedEx Ground, Purolator and UPS. The results presented provide a comprehensive overview of the performance of commercial hydraulic hybrid vehicles in parcel delivery applications. This project also informs fleets and manufacturers on the overall performance of hydraulic hybrid vehicles, provides insights on how the technology can be both improved and more effectively used. The key findings and recommendations of this project fall into four major categories: -Performance, -Fleet deployment, -Maintenance, -Business case. Hydraulic hybrid technology is relatively new to the market, as commercial vehicles have been introduced only in the past few years in refuse and parcel delivery applications. Successful demonstration could pave the way for additional purchases of hydraulic hybrid vehicles throughout the

  9. Office of Civilian Response Deployment Tracking System

    Data.gov (United States)

    US Agency for International Development — The purpose of OCR DTS is to establish, manage and track relevant Civilian Response Corps teams for deployment by sector experience, training, education etc.

  10. RadNet Air Quality (Deployable) Data

    Data.gov (United States)

    U.S. Environmental Protection Agency — RadNet Deployable Monitoring is designed to collect radiological and meteorological information and data asset needed to establish the impact of radiation levels on...

  11. Self-Deploying, Composite Habitats, Phase I

    Data.gov (United States)

    National Aeronautics and Space Administration — Cornerstone Research Group, Inc. (CRG), proposes to develop self-deploying, composite structures for lunar habitats, based on CRG's VeritexTM materials. These...

  12. Small cell networks deployment, management, and optimization

    CERN Document Server

    Claussen, Holger; Ho, Lester; Razavi, Rouzbeh; Kucera, Stepan

    2018-01-01

    Small Cell Networks: Deployment, Management, and Optimization addresses key problems of the cellular network evolution towards HetNets. It focuses on the latest developments in heterogeneous and small cell networks, as well as their deployment, operation, and maintenance. It also covers the full spectrum of the topic, from academic, research, and business to the practice of HetNets in a coherent manner. Additionally, it provides complete and practical guidelines to vendors and operators interested in deploying small cells. The first comprehensive book written by well-known researchers and engineers from Nokia Bell Labs, Small Cell Networks begins with an introduction to the subject--offering chapters on capacity scaling and key requirements of future networks. It then moves on to sections on coverage and capacity optimization, and interference management. From there, the book covers mobility management, energy efficiency, and small cell deployment, ending with a section devoted to future trends and applicat...

  13. Community integration after deployment to Afghanistan

    DEFF Research Database (Denmark)

    Karstoft, Karen-Inge; Armour, Cherie; Andersen, Søren B.

    2015-01-01

    OBJECTIVE: In the years following military deployment, soldiers may experience problems integrating into the community. However, little is known about the nature and prevalence of these problems and if they relate to posttraumatic symptomatology. METHODS: In a prospective, longitudinal study...

  14. Deployment strategies of managed lanes on arterials.

    Science.gov (United States)

    2015-02-01

    This report investigates issues related to planning, financing, deployment, and operation of managed : lanes on arterials. In this report, a strategy for managed lanes refers to a combination of the managed : lane type, the design and implementation,...

  15. Deploying Missile Defense: Major Operational Challenges

    National Research Council Canada - National Science Library

    Bunn, M

    2004-01-01

    By October 2004, the United States will have begun initial deployment of a missile defense capability albeit a modest, limited, and not completely proven one to defend the homeland against a limited...

  16. Deployable structures for a human lunar base

    Science.gov (United States)

    Gruber, Petra; Häuplik, Sandra; Imhof, Barbara; Özdemir, Kürsad; Waclavicek, Rene; Perino, Maria Antoinetta

    2007-06-01

    The study Lunar exploration architecture—deployable structures for a lunar base was performed within the Alcatel Alenia Space “Lunar Exploration Architecture” study for the European Space Agency. The purpose of the study was to investigate bionic concepts applicable to deployable structures and to interpret the findings for possible implementation concepts. The study aimed at finding innovative solutions for deployment possibilities. Translating folding/unfolding principles from nature, candidate geometries were developed and researched using models, drawings and visualisations. The use of materials, joints between structural elements and construction details were investigated for these conceptual approaches. Reference scenarios were used to identify the technical and environmental conditions, which served as design drivers. Mechanical issues and the investigation of deployment processes narrowed the selection down to six chosen concepts. Their applicability was evaluated at a conceptual stage in relation to the timescale of the mission.

  17. Military Families: Child Care Support During Deployments

    Science.gov (United States)

    ... temporary caregiver far in advance will make your children feel more secure. Try to have the caregiver connect prior to deployment through visits, phone calls, or social media. If you will be relocating to a family ...

  18. Concept of Deployable Network Operations Center (DNOC)

    National Research Council Canada - National Science Library

    Bordetsky, Alex; Thiry, Jeff; Johnson, Shawn

    2005-01-01

    .... The increasing use of expeditionary and special operations forces in ad hoc, dynamic, and tactical environments poses a need for an adaptable, flexible, and responsive deployable network operations center (DNOC...

  19. In-Flight Suppressant Deployment Temperatures

    National Research Council Canada - National Science Library

    Bein, Donald

    2006-01-01

    .... An assessment is made of the model output versus some aircraft measurement data, fire suppressant boiling point criterion, as well as the history of altitude/temperature at which fire suppressants have been deployed...

  20. Demonstration and Deployment Strategy Workshop: Summary

    Energy Technology Data Exchange (ETDEWEB)

    none,

    2014-05-01

    This report is based on the proceedings of the U.S. Department of Energy Bioenergy Technologies Office Demonstration and Deployment Strategy Workshop, held on March 12–13, 2014, at Argonne National Laboratory.

  1. Design and Development of NEA Scout Solar Sail Deployer Mechanism

    Science.gov (United States)

    Sobey, Alexander R.; Lockett, Tiffany Russell

    2016-01-01

    The 6U (approx.10 cm x 20 cm x 30 cm) cubesat Near Earth Asteroid (NEA) Scout1, projected for launch in September 2018 aboard the maiden voyage of the Space Launch System, will utilize a solar sail as its main method of propulsion throughout its approx.3-year mission to a Near Earth Asteroid. Due to the extreme volume constraints levied onto the mission, an acutely compact solar sail deployment mechanism has been designed to meet the volume and mass constraints, as well as provide enough propulsive solar sail area and quality in order to achieve mission success. The design of such a compact system required the development of approximately half a dozen prototypes in order to identify unforeseen problems, advance solutions, and build confidence in the final design product. This paper focuses on the obstacles of developing a solar sail deployment mechanism for such an application and the lessons learned from a thorough development process. The lessons presented will have significant applications beyond the NEA Scout mission, such as the development of other deployable boom mechanisms and uses for gossamer-thin films in space.

  2. A Novel Methodology for Charging Station Deployment

    Science.gov (United States)

    Sun, Zhonghao; Zhao, Yunwei; He, Yueying; Li, Mingzhe

    2018-02-01

    Lack of charging stations has been a main obstacle to the promotion of electric vehicles. This paper studies deploying charging stations in traffic networks considering grid constraints to balance the charging demand and grid stability. First, we propose a statistical model for charging demand. Then we combine the charging demand model with power grid constraints and give the formulation of the charging station deployment problem. Finally, we propose a theoretical solution for the problem by transforming it to a Markov Decision Process.

  3. State perspectives on clean coal technology deployment

    Energy Technology Data Exchange (ETDEWEB)

    Moreland, T. [State of Illinois Washington Office, Washington, DC (United States)

    1997-12-31

    State governments have been funding partners in the Clean Coal Technology program since its beginnings. Today, regulatory and market uncertainties and tight budgets have reduced state investment in energy R and D, but states have developed program initiatives in support of deployment. State officials think that the federal government must continue to support these technologies in the deployment phase. Discussions of national energy policy must include attention to the Clean Coal Technology program and its accomplishments.

  4. DRAGON - 8U Nanosatellite Orbital Deployer

    Science.gov (United States)

    Dobrowolski, Marcin; Grygorczuk, Jerzy; Kedziora, Bartosz; Tokarz, Marta; Borys, Maciej

    2014-01-01

    The Space Research Centre of the Polish Academy of Sciences (SRC PAS) together with Astronika company have developed an Orbital Deployer called DRAGON for ejection of the Polish scientific nanosatellite BRITE-PL Heweliusz (Fig. 1). The device has three unique mechanisms including an adopted and scaled lock and release mechanism from the ESA Rosetta mission MUPUS instrument. This paper discusses major design restrictions of the deployer, unique design features, and lessons learned from development through testing.

  5. Deploying Renewables - Best and Future Policy Practice

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2011-11-23

    The global energy system faces urgent challenges. Concerns about energy security are growing, as highlighted by the recent political turmoil in Northern Africa and the nuclear incident in Fukushima. At the same time, the need to respond to climate change is more critical than ever. Against this background, many governments have increased efforts to promote deployment of renewable energy -- low-carbon sources that can strengthen energy security. This has stimulated unprecedented rise in deployment, and renewables are now the fastest growing sector of the energy mix. This 'coming of age' of renewable energy also brings challenges. Growth is focused on a few of the available technologies, and rapid deployment is confined to a relatively small number of countries. In more advanced markets, managing support costs and system integration of large shares of renewable energy in a time of economic weakness and budget austerity has sparked vigorous political debate. The IEA's new report, Deploying Renewables 2011: Best and Future Policy Practice: - Provides a comprehensive review and analysis of renewable energy policy and market trends; - Analyses in detail the dynamics of deployment and provides best-practice policy principles for different stages of market maturity; - Assesses the impact and cost-effectiveness of support policies using new methodological tools and indicators; - Investigates the strategic reasons underpinning the pursuit of RE deployment by different countries and the prospects for globalisation of RE. This new book builds on and extends a 2008 IEA publication, drawing on recent policy and deployment experience world-wide. It provides guidance for policy makers and other stakeholders to avoid past mistakes, overcome new challenges and reap the benefits of deploying renewables -- today and tomorrow.

  6. The influence of financial factors on the deployment of telemedicine.

    Science.gov (United States)

    Smith, Douglas L

    2005-01-01

    The basic research question that guided this investigation was "Do financial indicators play a major role in decisions to deploy telemedicine?" The study also evaluated the relative importance of five specific financial indicators. Select hospital systems were asked to participate in this research. Because much has been written about the problems of access to health care in rural settings, the study included hospital systems with rural hospitals. The study also examined the importance of financial indicators to representatives of various functional disciplines. A qualitative case study approach was used for the research project.

  7. A regulations’ survey for the wireless telecommunications deployment in Colombia

    Directory of Open Access Journals (Sweden)

    José Gustavo Morales-Guarín

    2016-01-01

    Full Text Available This paper describes the current wireless telecommunications infrastructure deployment regulations in Colombia. It also refers to the possible effects that this infrastructure could cause to the country`s health and environment. similarly, the results obtained show a comparison between the Argentina’s current regulations, one of the most relevant researches carried out and the Colombian case. finally, some recommendations are proposed that can be considered in the project of regulations applicable in Colombia for the ensuring purpose that the non-ionizing radiation generated by wireless communications systems do not have effects on health and the environment.

  8. Large Scale eHealth Deployment in Europe: Insights from Concurrent Use of Standards.

    Science.gov (United States)

    Eichelberg, Marco; Chronaki, Catherine

    2016-01-01

    Large-scale eHealth deployment projects face a major challenge when called to select the right set of standards and tools to achieve sustainable interoperability in an ecosystem including both legacy systems and new systems reflecting technological trends and progress. There is not a single standard that would cover all needs of an eHealth project, and there is a multitude of overlapping and perhaps competing standards that can be employed to define document formats, terminology, communication protocols mirroring alternative technical approaches and schools of thought. eHealth projects need to respond to the important question of how alternative or inconsistently implemented standards and specifications can be used to ensure practical interoperability and long-term sustainability in large scale eHealth deployment. In the eStandards project, 19 European case studies reporting from R&D and large-scale eHealth deployment and policy projects were analyzed. Although this study is not exhaustive, reflecting on the concepts, standards, and tools for concurrent use and the successes, failures, and lessons learned, this paper offers practical insights on how eHealth deployment projects can make the most of the available eHealth standards and tools and how standards and profile developing organizations can serve the users embracing sustainability and technical innovation.

  9. Towards a local learning (innovation) model of solar photovoltaic deployment

    International Nuclear Information System (INIS)

    Shum, Kwok L.; Watanabe, Chihiro

    2008-01-01

    It is by now familiar that in the deployment of solar photovoltaic (PV) systems, the cost dynamics of major system component like solar cell/module is subjected to experience curve effects driven by production learning and research and development at the supplier side. What is less clear, however, is the economics of system integration or system deployment that takes place locally close to the user, involving other market players, in the downstream solar PV value chain. Experts have agreed that suppliers of solar PV system must customize their flexible characteristics to address local unique users' and applications requirements and compete on price/performance basis. A lack of understanding of the drivers of the economics of system customization therefore is a deficiency in our understanding of the overall economics of this renewable energy technology option. We studied the non-module BOS cost for grid-connected small PV system using the experience curve framework. Preliminary analysis of PV statistics of the US from IEA seems to suggest that learning in one application type is taking place with respect to the cumulative installation among all types of grid-connected small PV projects. The effectiveness of this learning is also improving over time. A novel aspect is the interpretation of such experience curve effect or learning pattern. We draw upon the notion of product platform in the industrial management literature and consider different types of local small-scale grid-tied PV customization projects as adapting a standard platform to different idiosyncratic and local application requirements. Economics of system customization, which is user-oriented, involves then a refined notion of inter-projects learning, rather than volume-driven learning by doing. We formalized such inter-projects learning as a dynamic economy of scope, which can potentially be leveraged to manage the local and downstream aspect of PV deployment. This dynamic economy may serve as a focus

  10. Deployment Support Leading to Implementation

    Energy Technology Data Exchange (ETDEWEB)

    Cook, E E

    1997-10-01

    The following paragraphs summarize the progress of each research project funded under the WVU Cooperative Agreement during the third quarter of 1997 (July - September 1997). The projects are arranged according to their 1997 WVU task number. WVU Focus Area 1.0: Subsurface Contaminants, Containment and Remediation Task No. 1.1: Project discontinued. Task No. 1.2: Development of Standard Test Protocols and Barrier Design Models for Desiccation Barriers (K. Amininan & S. Ameri): A number of experiments were preformed this period to evaluate the ability of the dried sand-packs to act as a barrier to liquids. Water infiltration tests were done with a constant head, dispersing 80 ml of water, and by adding water in small increments. Results indicate that when the water is spilled over the sand-pack, it has the tendency to channel through the sand-pack, significantly reducing the capacity of the dried zone to retain liquid contaminants. This appears to be largely influenced by particle size. As the particle size is reduced, the capillary forces spread the water and prevent/delay channels from forming. The measured permeability values were in agreement with those measured with air. The water retention capacity and capillary rise were largely influenced by time and showed no sensitivity to channeling. The water retention capacity tests suggest the sand-packs can retain more water than the expected. Two sets of water infiltration and drying experiments were designed to evaluate the CAB's ability to prevent spills from spreading. Ten ml of water was injected every 20 minutes and 80 ml of water was added at one time. When injected slowly, results showed the drying process to be similar to the original drying process. The second set indicted the drying process follows a slowly declining drying with no break through. Results also suggested that air flow through the sand-pack can remove water infiltration. The air flow appeared to prevent any water channeling and thus should

  11. Simulating CubeSat Structure Deployment Dynamics, Phase I

    Data.gov (United States)

    National Aeronautics and Space Administration — There is high value in simulating the nonlinear dynamics of stowing, deploying, and performance of deployable space structures, especially given the profound...

  12. SDN Project

    Energy Technology Data Exchange (ETDEWEB)

    Smith, Rhett [Schweitzer Engineering Laboratories Inc, Pullman, WA (United States)

    2016-12-23

    The SDN Project completed on time and on budget and successfully accomplished 100% of the scope of work outlined in the original Statement of Project Objective (SOPO). The SDN Project formed an alliance between Ameren Corporation, University of Illinois Urbana- Champaign (UIUC), Pacific Northwest National Laboratories (PNNL), and Schweitzer Engineering Laboratories, Inc. (SEL). The objective of the SDN Project is to address Topic Area of Interest 2: Sustain critical energy delivery functions while responding to a cyber-intrusion under Funding Opportunity Announcement DE-FOA-0000797. The goal of the project is to design and commercially release technology that provides a method to sustain critical energy delivery functions during a cyber intrusion and to do this control system operators need the ability to quickly identify and isolate the affected network areas, and re-route critical information and control flows around. The objective of the SDN Project is to develop a Flow Controller that monitors, configures, and maintains the safe, reliable network traffic flows of all the local area networks (LANs) on a control system in the Energy sector. The SDN team identified the core attributes of a control system and produced an SDN flow controller that has the same core attributes enabling networks to be designed, configured and deployed that maximize the whitelisted, deny-bydefault and purpose built networks. This project researched, developed and commercially released technology that: Enables all field networks be to configured and monitored as if they are a single asset to be protected; Enables greatly improved and even precalculated response actions to reliability and cyber events; Supports pre-configured localized response actions tailored to provide resilience against failures and centralized response to cyber-attacks that improve network reliability and availability; Architecturally enables the right subject matter experts, who are usually the information

  13. Advanced ordered intermetallic alloy deployment

    Energy Technology Data Exchange (ETDEWEB)

    Liu, C.T.; Maziasz, P.J.; Easton, D.S. [Oak Ridge National Lab., TN (United States)

    1997-04-01

    The need for high-strength, high-temperature, and light-weight materials for structural applications has generated a great deal of interest in ordered intermetallic alloys, particularly in {gamma}-based titanium aluminides {gamma}-based TiAl alloys offer an attractive mix of low density ({approximately}4g/cm{sup 3}), good creep resistance, and high-temperature strength and oxidation resistance. For rotating or high-speed components. TiAl also has a high damping coefficient which minimizes vibrations and noise. These alloys generally contain two phases. {alpha}{sub 2} (DO{sub 19} structure) and {gamma} (L 1{sub 0}), at temperatures below 1120{degrees}C, the euticoid temperature. The mechanical properties of TiAl-based alloys are sensitive to both alloy compositions and microstructure. Depending on heat-treatment and thermomechanical processing, microstructures with near equiaxed {gamma}, a duplex structure (a mix of the {gamma} and {alpha}{sub 2} phases) can be developed in TiAl alloys containing 45 to 50 at. % Al. The major concern for structural use of TiAl alloys is their low ductility and poor fracture resistance at ambient temperatures. The purpose of this project is to improve the fracture toughness of TiAl-based alloys by controlling alloy composition, microstructure and thermomechanical treatment. This work is expected to lead to the development of TiAl alloys with significantly improved fracture toughness and tensile ductility for structural use.

  14. Design and initial deployment of the wireless local area networking infrastructure at Sandia National Laboratories.

    Energy Technology Data Exchange (ETDEWEB)

    Long, John P.; Hamill, Michael J.; Mitchell, M. G.; Miller, Marc M.; Witzke, Edward L.; Wiener, Dallas J

    2006-11-01

    A major portion of the Wireless Networking Project at Sandia National Laboratories over the last few years has been to examine IEEE 802.11 wireless networking for possible use at Sandia and if practical, introduce this technology. This project team deployed 802.11a, b, and g Wireless Local Area Networking at Sandia. This report examines the basics of wireless networking and captures key results from project tests and experiments. It also records project members thoughts and designs on wireless LAN architecture and security issues. It documents some of the actions and milestones of this project, including pilot and production deployment of wireless networking equipment, and captures the team's rationale behind some of the decisions made. Finally, the report examines lessons learned, future directions, and conclusions.

  15. Turbo-machine deployment of HTR-10 GT

    International Nuclear Information System (INIS)

    Zhu Shutang; Wang Jie; Zhang Zhengming; Yu Suyuan

    2005-01-01

    As a testing project of gas turbine modular High Temperature Gas-cooled Reactor (HTGR), HTR-10GT has been studied and developed by Institute of Nuclear and New Energy Technology (INET) of Tsinghua University after the success of HTR-10 with steam turbine cycle. The main purposes of this project are to demonstrate the gas turbine modular HTGR, to optimize the deployment of Power Conversion Unit (PCU) and to verify the techniques of turbo-machine, operating modes and controlling measures. HTR-10GT is concentrated on the PCU design and the turbo-machine deployment. Possible turbo-machine deployments have been investigated and two of them are introduced in this paper. The preliminary design for the turbo-machine of HTR-10GT is single-shaft of vertical layout, arranged by the side of the reactor and the turbo-compressor rotary speed was selected to be 250 s -1 (15000 r/min) by considering the efficiency of turbo-compressor blade systems, the strength conditions and the mass and size characteristics of the turbo-compressor. The rotor system will be supported by electromagnetic bearings (EMBs) to curb the possible pollutions of the primary loop. Of all the components in this design, the high speed turbo-generator seems to be a world-wide technical nut. As an alternative design, a gearbox complex is used to reduce the rotary speed from the turbo-compressor 250 s -1 to 50 s -1 so that the ordinary generator can be used. (authors)

  16. Deployment of Wind Turbines in the Built Environment: Risks, Lessons, and Recommended Practices

    Energy Technology Data Exchange (ETDEWEB)

    Baring-Gould, Ian; Fields, Jason; Oteri, Frank; Preus, Robert

    2017-05-31

    Built-environment wind turbine (BEWT) projects are wind energy projects that are constructed on, in, or near buildings, as shown below. These projects present an opportunity for distributed, low-carbon generation combined with highly visible statements on sustainability, but the BEWT niche of the wind industry is still developing and is relatively less mature than the utility-scale wind or conventional ground-based distributed wind sectors. This poster investigates the current state of the BEWT industry by reviewing available literature on BEWT projects as well as interviewing project owners on their experiences deploying and operating the technology.

  17. An independent investigation into the deployment of the federal communications commissions' rural health care pilot program.

    Science.gov (United States)

    Whitten, Pamela; Holtz, Bree; Laplante, Carolyn; Alverson, Dale; Krupinski, Elizabeth

    2010-12-01

    the goal of this study was to provide an independent and objective evaluation of the implementation of the Federal Communications Commission's Rural Health Care Pilot Program. thirty-nine of the programs that were provided funding through this program were interviewed and asked about their project deployment, network planning, and the involvement of their state in implementation. RESULTS showed that programs recruited project team members from a variety of fields to fulfill different roles. Network partners were often chosen because they were stakeholders in the outcome of the project and because they had a past working relationship with the grant-receiving programs. In terms of deployment, many programs had made progress in filling out necessary paperwork and were tracking milestones, but had experienced changes since first receiving funding, such as losing participants. Additionally, many encountered challenges that inhibited deployment, such as coping with rule fluctuations. Many of the programs received support from their respective state governments in project development, often through matching funds, but few states were involved in the actual management of projects. as rural healthcare facilities often lack the information technology infrastructure compared with many urban facilities, it is important to understand the implementation process for programs such as the Rural Health Care Pilot Program and to examine what contributes to progress, stagnation, or disintegration. Although the programs reported some success, almost all had encountered challenges that inhibited implementation. A follow-up study is planned to further investigate deployment and determine the implications of Federal Communications Commission funding.

  18. A Remotely Deployable Wind Sonic Anemometer

    Directory of Open Access Journals (Sweden)

    Muhammad Awais

    2017-12-01

    Full Text Available Communication and computing shape up base for explosion of Internet of Things (IoT era. Humans can efficiently control the devices around their environment as per requirements because of IoT, the communication between different devices brings more flexibility in surrounding. Useful data is also gathered from some of these devices to create Big Data; where, further analysis assist in making life easier by developing good business models corresponding to user needs, enhance scientific research, formulating weather prediction or monitoring systems and contributing in other relative fields as well. Thus, in this research a remotely deployable IoT enabled Wind Sonic Anemometer has been designed and deployed to calculate average wind speed, direction, and gust. The proposed design is remotely deployable, user-friendly, power efficient and cost-effective because of opted modules i.e., ultrasonic sensors, GSM module, and solar panel. The testbed was also deployed at the roof of Computer & Information Systems Engineering (CIS department, NED UET. Further, its calibration has been carried out by using long short-term memory (LSTM, a deep learning technique; where ground truth data has been gathered from mechanical wind speed sensor (NRG-40 H deployed at top of Industrial & Manufacturing (IM department of NED UET. The obtained results are satisfactory and the performance of designed sensor is also good under various weather conditions.

  19. Environmental issues affecting clean coal technology deployment

    Energy Technology Data Exchange (ETDEWEB)

    Miller, M.J. [Electric Power Research Inst., Palo Alto, CA (United States)

    1997-12-31

    The author outlines what he considers to be the key environmental issues affecting Clean Coal Technology (CCT) deployment both in the US and internationally. Since the international issues are difficult to characterize given different environmental drivers in various countries and regions, the primary focus of his remarks is on US deployment. However, he makes some general remarks, particularly regarding the environmental issues in developing vs. developed countries and how these issues may affect CCT deployment. Further, how environment affects deployment depends on which particular type of clean coal technology one is addressing. It is not the author`s intention to mention many specific technologies other than to use them for the purposes of example. He generally categorizes CCTs into four groups since environment is likely to affect deployment for each category somewhat differently. These four categories are: Precombustion technologies such as coal cleaning; Combustion technologies such as low NOx burners; Postcombustion technologies such as FGD systems and postcombustion NOx control; and New generation technologies such as gasification and fluidized bed combustion.

  20. Communication tools between Grid virtual organisations, middleware deployers and sites

    CERN Document Server

    Dimou, Maria

    2008-01-01

    Grid Deployment suffers today from the difficulty to reach users and site administrators when a package or a configuration parameter changes. Release notes, twiki pages and news’ broadcasts are not efficient enough. The interest of using GGUS as an efficient and effective intra-project communication tool is the message to the user community presented here. The purpose of GGUS is to bring together End Users and Supporters in the Regions where the Grid is deployed and in operation. Today’s Grid usage is still very far from the simplicity and functionality of the web. While pressing for middleware usability, we try to turn the Global Grid User Support (GGUS) into the central tool for identifying areas in the support environment that need attention. To do this, we exploit GGUS' capacity to expand, by including new Support Units that follow the project's operational structure. Using tailored GGUS database searches we obtain concrete results that prove where we need to improve procedures, Service Level Agreemen...

  1. Soldier-Warfighter Operationally Responsive Deployer for Space

    Science.gov (United States)

    Davis, Benny; Huebner, Larry; Kuhns, Richard

    2015-01-01

    The Soldier-Warfighter Operationally Responsive Deployer for Space (SWORDS) project was a joint project between the U.S. Army Space & Missile Defense Command (SMDC) and NASA. The effort, lead by SMDC, was intended to develop a three-stage liquid bipropellant (liquid oxygen/liquid methane), pressure-fed launch vehicle capable of inserting a payload of at least 25 kg to a 750-km circular orbit. The vehicle design was driven by low cost instead of high performance. SWORDS leveraged commercial industry standards to utilize standard hardware and technologies over customized unique aerospace designs. SWORDS identified broadly based global industries that have achieved adequate levels of quality control and reliability in their products and then designed around their expertise and business motivations.

  2. Simplified Deployment of Health Informatics Applications by Providing Docker Images.

    Science.gov (United States)

    Löbe, Matthias; Ganslandt, Thomas; Lotzmann, Lydia; Mate, Sebastian; Christoph, Jan; Baum, Benjamin; Sariyar, Murat; Wu, Jie; Stäubert, Sebastian

    2016-01-01

    Due to the specific needs of biomedical researchers, in-house development of software is widespread. A common problem is to maintain and enhance software after the funded project has ended. Even if many tools are made open source, only a couple of projects manage to attract a user basis large enough to ensure sustainability. Reasons for this include complex installation and configuration of biomedical software as well as an ambiguous terminology of the features provided; all of which make evaluation of software laborious. Docker is a para-virtualization technology based on Linux containers that eases deployment of applications and facilitates evaluation. We investigated a suite of software developments funded by a large umbrella organization for networked medical research within the last 10 years and created Docker containers for a number of applications to support utilization and dissemination.

  3. Evaluation of Representative Smart Grid Investment Grant Project Technologies: Thermal Energy Storage

    Energy Technology Data Exchange (ETDEWEB)

    Tuffner, Francis K.; Bonebrake, Christopher A.

    2012-02-14

    This document is one of a series of reports estimating the benefits of deploying technologies similar to those implemented on the Smart Grid Investment Grant (SGIG) projects. Four technical reports cover the various types of technologies deployed in the SGIG projects, distribution automation, demand response, energy storage, and renewables integration. A fifth report in the series examines the benefits of deploying these technologies on a national level. This technical report examines the impacts of energy storage technologies deployed in the SGIG projects.

  4. Service Creation and Deployment in Converged Networks

    DEFF Research Database (Denmark)

    Soler, José

    for these experiences is the transition of telecommunication (telephony) networks from circuit switched based systems towards packet based ones. The text of this monograph proceeds, unaltered for the most, from the author’s PhD thesis “Framework for Deployment of Advanced Telecommunication Services in Current......This monograph (Early Experiences related to Service Creation & Deployment in Converged Networks) presents different experiences related to architectures and mechanisms for deployment of telephony services, understood as especial features complementing the basic voice service. The context...... and Future Converged Networks”, carried out at the Technical University of Denmark in the period [April 2002-April 2005]. Even though the technologies presented in the text have evolved from that period until now, the presented scenarios and setups are still valid as interesting initial steps in the realm....

  5. Deploying Embodied AI into Virtual Worlds

    Science.gov (United States)

    Burden, David J. H.

    The last two years have seen the start of commercial activity within virtual worlds. Unlike computer games where Non-Player-Character avatars are common, in most virtual worlds they are the exception — and until recently in Second Life they were non-existent. However there is real commercial scope for Als in these worlds — in roles from virtual sales staff and tutors to personal assistants. Deploying an embodied AI into a virtual world offers a unique opportunity to evaluate embodied Als, and to develop them within an environment where human and computer are on almost equal terms. This paper presents an architecture being used for the deployment of chatbot driven avatars within the Second Life virtual world, looks at the challenges of deploying an AI within such a virtual world, the possible implications for the Turing Test, and identifies research directions for the future.

  6. Deployment Instabilities of Lobed-Pumpkin Balloon

    Science.gov (United States)

    Nakashino, Kyoichi

    A lobed-pumpkin balloon, currently being developed in ISAS/JAXA as well as in NASA, is a promising vehicle for long duration scientific observations in the stratosphere. Recent ground and flight experiments, however, have revealed that the balloon has deployment instabilities under certain conditions. In order to overcome the instability problems, a next generation SPB called 'tawara' type balloon has been proposed, in which an additional cylindrical part is appended to the standard lobed-pumpkin balloon. The present study investigates the deployment stability of tawara type SPB in comparison to that of standard lobed-pumpkin SPB through eigenvalue analysis on the basis of finite element methods. Our numerical results show that tawara type SPB enjoys excellent deployment performance over the standard lobed-pumpkin SPBs.

  7. A Modular Approach To Developing A Large Deployable Reflector

    Science.gov (United States)

    Pittman, R.; Leidich, C.; Mascy, F.; Swenson, B.

    1984-01-01

    NASA is currently studying the feasibility of developing a Large Deployable Reflector (LDR) astronomical facility to perform astrophysical studies of the infrared and submillimeter portion of the spectrum in the mid 1990's. The LDR concept was recommended by the Astronomy Survey Committee of the National Academy of Sciences as one of two space based projects to be started this decade. The current baseline calls for a 20 m (65.6 ft) aperture telescope diffraction limited at 30 μm and automatically deployed from a single Shuttle launch. The volume, performance, and single launch constraints place great demands on the technology and place LDR beyond the state-of-the-art in certain areas such as lightweight reflector segments. The advent of the Shuttle is opening up many new options and capabilities for producing large space systems. Until now, LDR has always been conceived as an integrated system, deployed autonomously in a single launch. This paper will look at a combination of automatic deployment and on-orbit assembly that may reduce the technological complexity and cost of the LDR system. Many technological tools are now in use or under study that will greatly enhance our capabilities to do assembly in space. Two Shuttle volume budget scenarios will be examined to assess the potential of these tools to reduce the LDR system complexity. Further study will be required to reach the full optimal combination of deployment and assembly, since in most cases the capabilities of these new tools have not been demonstrated. In order to take maximum advantage of these concepts, the design of LDR must be flexible and allow one subsystem to be modified without adversely affecting the entire system. One method of achieving this flexibility is to use a modular design approach in which the major subsystems are physically separated during launch and assembled on orbit. A modular design approach facilitates this flexibility but requires that the subsystems be interfaced in a simple

  8. Comparing post-deployment mental health services utilization in soldiers deployed to Balkan, Iraq and Afghanistan

    DEFF Research Database (Denmark)

    Madsen, T; Sadowa Vedtofte, M; Nordentoft, M

    2017-01-01

    OBJECTIVE: Insight on how different missions have impacted rates of mental health service (MHS) utilization is unexplored. We compared postdeployment MHS utilization in a national cohort of first-time deployed to missions in Balkan, Iraq, and Afghanistan respectively. METHODS: A prospective...... national cohort study of 13 246 first-time deployed in the period 1996 through 2012 to missions in Balkan area, Iraq, or Afghanistan respectively. Soldiers 'MHS utilization was also compared with a 5:1 sex-, age-, and calendar year-matched never-deployed background population. Postdeployment utilization...... of psychotropics. RESULTS: Utilizing of psychiatric outpatient services and psychotropics was significantly higher in first-time deployed to Iraq and Afghanistan compared with deployed to Balkan. However, the rate of postdeployment admission to psychiatric hospital did not differ between missions. Postdeployment...

  9. Designing, developing, and deploying systems to support human-robot teams in disaster response

    NARCIS (Netherlands)

    Kruijff, G.J.M.; Kruijff-Korbayová, I.; Keshavdas, S.; Larochelle, B.; Janíček, M.; Colas, F.; Liu, M.; Pomerleau, F.; Siegwart, R.; Neerincx, M.A.; Looije, R.; Smets, N.J.J.M.; Mioch, T.; Diggelen, J. van; Pirri, F.; Gianni, M.; Ferri, F.; Menna, M.; Worst, R.; Linder, T.; Tretyakov, V.; Surmann, H.; Svoboda, T.; Reinštein, M.; Zimmermann, K.; Petříček, T.; Hlaváč, V.

    2014-01-01

    This paper describes our experience in designing, developing and deploying systems for supporting human-robot teams during disaster response. It is based on R&D performed in the EU-funded project NIFTi. NIFTi aimed at building intelligent, collaborative robots that could work together with humans in

  10. Deployment Strategies and Clustering Protocols Efficiency

    Directory of Open Access Journals (Sweden)

    Chérif Diallo

    2017-06-01

    Full Text Available Wireless sensor networks face significant design challenges due to limited computing and storage capacities and, most importantly, dependence on limited battery power. Energy is a critical resource and is often an important issue to the deployment of sensor applications that claim to be omnipresent in the world of future. Thus optimizing the deployment of sensors becomes a major constraint in the design and implementation of a WSN in order to ensure better network operations. In wireless networking, clustering techniques add scalability, reduce the computation complexity of routing protocols, allow data aggregation and then enhance the network performance. The well-known MaxMin clustering algorithm was previously generalized, corrected and validated. Then, in a previous work we have improved MaxMin by proposing a Single- node Cluster Reduction (SNCR mechanism which eliminates single-node clusters and then improve energy efficiency. In this paper, we show that MaxMin, because of its original pathological case, does not support the grid deployment topology, which is frequently used in WSN architectures. The unreliability feature of the wireless links could have negative impacts on Link Quality Indicator (LQI based clustering protocols. So, in the second part of this paper we show how our distributed Link Quality based d- Clustering Protocol (LQI-DCP has good performance in both stable and high unreliable link environments. Finally, performance evaluation results also show that LQI-DCP fully supports the grid deployment topology and is more energy efficient than MaxMin.

  11. Iron Status of Deployed Military Members

    Science.gov (United States)

    2017-01-04

    ready force Deploy with and care for the warrior Care for all entrusted to our care Nursing Competencies and Practice: Patient outcomes...duties, physical activities, iron intake through diet ). This additional information would improve the ability to determine factors associated with

  12. Microsoft System Center Configuration Manager advanced deployment

    CERN Document Server

    Coupland, Martyn

    2014-01-01

    If you are an experienced Configuration Manager administrator looking to advance your career or get more from your current environment, then this book is ideal for you. Prior experience of deploying and managing a Configuration Manager site would be helpful in following the examples throughout this book.

  13. Military Deployment and Elementary Student Achievement

    Science.gov (United States)

    Phelps, Terri; Dunham, Mardis; Lyons, Robert

    2010-01-01

    This study investigated the impact that military deployment has upon academic achievement of elementary school students. TerraNova test scores of 137 fourth and fifth grade students in two elementary schools with a high proportion of military dependent children were examined for two consecutive years. Although the academic test performance fell…

  14. 77 FR 36903 - Accelerating Broadband Infrastructure Deployment

    Science.gov (United States)

    2012-06-20

    ... the Nation's global competitiveness in the 21st century, driving job creation, promoting innovation, and expanding markets for American businesses. Broadband access also affords public safety agencies... infrastructure has been deployed in a vast majority of communities across the country, today too many areas still...

  15. Guam: U.S. Defense Deployments

    Science.gov (United States)

    2013-11-15

    August 8, 2013; Ta Kung Pao, August 12, 2013. 22 Sam Kim, “N. Korea Deploys Medium-Range Missiles, Bolsters Special Forces,” Yonhap, Seoul, February 23...building up its submarine force (both nuclear-powered and diesel-electric). In November 2004, the PLA Navy sent a Han -class nuclear attack submarine

  16. Very Low Head Turbine Deployment in Canada

    International Nuclear Information System (INIS)

    Kemp, P; Williams, C; Sasseville, Remi; Anderson, N

    2014-01-01

    The Very Low Head (VLH) turbine is a recent turbine technology developed in Europe for low head sites in the 1.4 - 4.2 m range. The VLH turbine is primarily targeted for installation at existing hydraulic structures to provide a low impact, low cost, yet highly efficient solution. Over 35 VLH turbines have been successfully installed in Europe and the first VLH deployment for North America is underway at Wasdell Falls in Ontario, Canada. Deployment opportunities abound in Canada with an estimated 80,000 existing structures within North America for possible low-head hydro development. There are several new considerations and challenges for the deployment of the VLH turbine technology in Canada in adapting to the hydraulic, environmental, electrical and social requirements. Several studies were completed to determine suitable approaches and design modifications to mitigate risk and confirm turbine performance. Diverse types of existing weirs and spillways pose certain hydraulic design challenges. Physical and numerical modelling of the VLH deployment alternatives provided for performance optimization. For this application, studies characterizing the influence of upstream obstacles using water tunnel model testing as well as full-scale prototype flow dynamics testing were completed. A Cold Climate Adaptation Package (CCA) was developed to allow year-round turbine operation in ice covered rivers. The CCA package facilitates turbine extraction and accommodates ice forces, frazil ice, ad-freezing and cold temperatures that are not present at the European sites. The Permanent Magnet Generator (PMG) presents some unique challenges in meeting Canadian utility interconnection requirements. Specific attention to the frequency driver control and protection requirements resulted in a driver design with greater over-voltage capability for the PMG as well as other key attributes. Environmental studies in Europe included fish friendliness testing comprised of multiple in

  17. Very Low Head Turbine Deployment in Canada

    Science.gov (United States)

    Kemp, P.; Williams, C.; Sasseville, Remi; Anderson, N.

    2014-03-01

    The Very Low Head (VLH) turbine is a recent turbine technology developed in Europe for low head sites in the 1.4 - 4.2 m range. The VLH turbine is primarily targeted for installation at existing hydraulic structures to provide a low impact, low cost, yet highly efficient solution. Over 35 VLH turbines have been successfully installed in Europe and the first VLH deployment for North America is underway at Wasdell Falls in Ontario, Canada. Deployment opportunities abound in Canada with an estimated 80,000 existing structures within North America for possible low-head hydro development. There are several new considerations and challenges for the deployment of the VLH turbine technology in Canada in adapting to the hydraulic, environmental, electrical and social requirements. Several studies were completed to determine suitable approaches and design modifications to mitigate risk and confirm turbine performance. Diverse types of existing weirs and spillways pose certain hydraulic design challenges. Physical and numerical modelling of the VLH deployment alternatives provided for performance optimization. For this application, studies characterizing the influence of upstream obstacles using water tunnel model testing as well as full-scale prototype flow dynamics testing were completed. A Cold Climate Adaptation Package (CCA) was developed to allow year-round turbine operation in ice covered rivers. The CCA package facilitates turbine extraction and accommodates ice forces, frazil ice, ad-freezing and cold temperatures that are not present at the European sites. The Permanent Magnet Generator (PMG) presents some unique challenges in meeting Canadian utility interconnection requirements. Specific attention to the frequency driver control and protection requirements resulted in a driver design with greater over-voltage capability for the PMG as well as other key attributes. Environmental studies in Europe included fish friendliness testing comprised of multiple in

  18. Deployment Effects of Marine Renewable Energy Technologies: Wave Energy Scenarios

    Energy Technology Data Exchange (ETDEWEB)

    Mirko Previsic

    2010-06-17

    Given proper care in siting, design, deployment, operation and maintenance, wave energy conversion could become one of the more environmentally benign sources of electricity generation. In order to accelerate the adoption of these emerging hydrokinetic and marine energy technologies, navigational and environmental concerns must be identified and addressed. All developing hydrokinetic projects involve a wide variety of stakeholders. One of the key issues that site developers face as they engage with this range of stakeholders is that, due to a lack of technical certainty, many of the possible conflicts (e.g., shipping and fishing) and environmental issues are not well-understood,. In September 2008, re vision consulting, LLC was selected by the Department of Energy (DoE) to apply a scenario-based assessment to the emerging hydrokinetic technology sector in order to evaluate the potential impact of these technologies on the marine environment and navigation constraints. The project’s scope of work includes the establishment of baseline scenarios for wave and tidal power conversion at potential future deployment sites. The scenarios capture variations in technical approaches and deployment scales to properly identify and characterize environmental effects and navigational effects. The goal of the project is to provide all stakeholders with an improved understanding of the potential range of technical attributes and potential effects of these emerging technologies and focus all stakeholders on the critical issues that need to be addressed. By identifying and addressing navigational and environmental concerns in the early stages of the industry’s development, serious mistakes that could potentially derail industry-wide development can be avoided. This groundwork will also help in streamlining siting and associated permitting processes, which are considered key hurdles for the industry’s development in the U.S. today. Re vision is coordinating its efforts with two

  19. Garden State Parkway Corridor : ITS early deployment planning study : strategic deployment plan

    Science.gov (United States)

    1997-12-01

    This Strategic Deployment Plan describes ways of improving travel within the Garden : State Parkway Corridor using intelligent transportation systems (ITS) and without : constructing additional roadway lanes. Travel improvements will be possible with...

  20. Strategies to facilitate stakeholder and regulator support for technology deployment

    International Nuclear Information System (INIS)

    Burford, T.D.

    1997-01-01

    Implementation and deployment of new and innovative environmental technologies is impossible without regulator, enduser and stakeholder support. Technologies being developed for different needs require different strategies to facilitate this endorsement. Areas addressed will include technologies developed to meet site specific cleanup needs and those developed for multiple site applications. A third area deals with using site specific technologies at previously unidentified locations. In order to expand the application of these technologies to other sites a plan to include potential site regulators and stakeholders early in the development process should be considered. The Subsurface Contaminant Focus Area has developed a Stakeholder Communication Plan. This plan, in addition to lessons learned from current technology development projects that have successfully obtained this type of support, will provide the basis for the information provided in this paper. The object of this paper is to suggest strategies that could facilitate the implementation and deployment of technologies at environmental sites by involving regulators and stakeholders at the proper time for various applications

  1. NEON's Mobile Deployment Platform: A Resource for Community Research

    Science.gov (United States)

    Sanclements, M.

    2017-12-01

    Here we provide an update on construction of the five NEON Mobile Deployment Platforms (MDPs) as well as a description of the infrastructure and sensors available to researchers in the near future. Additionally, we include information (i.e. timelines and procedures) on requesting MDPs for PI led projects. The MDPs will provide the means to observe stochastic or spatially important events, gradients, or quantities that cannot be reliably observed using fixed location sampling (e.g. fires and floods). Due to the transient temporal and spatial nature of such events, the MDPs are designed to accommodate rapid deployment for time periods up to 1 year. Broadly, the MDPs are comprised of infrastructure and instrumentation capable of functioning individually or in conjunction with one another to support observations of ecological change, as well as education, training and outreach. More specifically, the MDPs include the capability to make tower based measures of ecosystem exchange, radiation, and precipitation in conjunction with baseline soils data such as CO2 flux, and soil temperature and moisture. An aquatics module is also available with the MDP to facilitate research integrating terrestrial and aquatic processes. Ultimately, the NEON MDPs provide a tool for linking PI led research to the continental scale data sets collected by NEON.

  2. Development Strategies for Deployment of Biomass Resources in the Production of Biomass Power: November 6, 2001--February 28, 2003

    Energy Technology Data Exchange (ETDEWEB)

    Kaminsky, J.

    2004-01-01

    The study analyzes strategies for deployment of biomass resources for biopower generation. It compares biomass supply databases and the projected biopower market penetration for several alternative incentive scenarios. It analyzes the availability of biomass to meet the projected market demands and recommends future research.

  3. Deployment of Analytics into the Healthcare Safety Net: Lessons Learned.

    Science.gov (United States)

    Hartzband, David; Jacobs, Feygele

    2016-01-01

    As payment reforms shift healthcare reimbursement toward value-based payment programs, providers need the capability to work with data of greater complexity, scope and scale. This will in many instances necessitate a change in understanding of the value of data, and the types of data needed for analysis to support operations and clinical practice. It will also require the deployment of different infrastructure and analytic tools. Community health centers, which serve more than 25 million people and together form the nation's largest single source of primary care for medically underserved communities and populations, are expanding and will need to optimize their capacity to leverage data as new payer and organizational models emerge. To better understand existing capacity and help organizations plan for the strategic and expanded uses of data, a project was initiated that deployed contemporary, Hadoop-based, analytic technology into several multi-site community health centers (CHCs) and a primary care association (PCA) with an affiliated data warehouse supporting health centers across the state. An initial data quality exercise was carried out after deployment, in which a number of analytic queries were executed using both the existing electronic health record (EHR) applications and in parallel, the analytic stack. Each organization carried out the EHR analysis using the definitions typically applied for routine reporting. The analysis deploying the analytic stack was carried out using those common definitions established for the Uniform Data System (UDS) by the Health Resources and Service Administration. 1 In addition, interviews with health center leadership and staff were completed to understand the context for the findings. The analysis uncovered many challenges and inconsistencies with respect to the definition of core terms (patient, encounter, etc.), data formatting, and missing, incorrect and unavailable data. At a population level, apparent underreporting

  4. Deployable reflector configurations. [for space telescope

    Science.gov (United States)

    Meinel, A. B.; Meinel, M. P.; Woolf, N. J.

    1983-01-01

    Both the theoretical reasons for considering a non-circular format for the Large Deployable Reflector, and a potentially realizable concept for such a device, are discussed. The optimum systems for diffraction limited telescopes with incoherent detection have either a single filled aperture, or two such apertures as an interferometer to synthesize a larger aperture. For a single aperture of limited area, a reflector in the form of a slot can be used to give increased angular resolution. It is shown how a 20 x 8 meter telescope can be configured to fit the Space Shuttle bay, and deployed with relatively simple operations. The relationship between the sunshield design and the inclination of the orbit is discussed. The possible use of the LDR as a basic module to permit the construction of supergiant space telescopes and interferometers both for IR/submm studies and for the entire ultraviolet through mm wave spectral region is discussed.

  5. Towards the Ubiquitous Deployment of DNSSEC

    Science.gov (United States)

    2016-01-01

    and Session Initiation Protocol ( SIP ). However, it remains to be seen how quickly these enhancements are picked up and deployed. The second...Security RDI Resources for the DNSSEC Initiative System (the C&A system) RFC Request For Comments SIP Session Initiation Protocol SMTP Simple Mail...DISTRIBUTION UNLIMITED 1 Summary The Secure Extensions to the Domain Name System (DNSSEC) comprise of a set of protocol extensions that fix a

  6. THE PROTECTION AND DEPLOYMENT OF FINANCIAL INNOVATION

    OpenAIRE

    PETER GIANIODIS; JILL A. BROWN

    2013-01-01

    Prevailing theory suggests that firms that effectively protect technological discoveries from emulation will create and capture value. Despite its importance, little research has examined the specific mechanisms of how to protect technological discoveries, and have heretofore emphasized the importance of inherent resource attributes to limit competitor emulation. Using a sample of financial patents, we test theory regarding the effects of resource attributes and deployment mechanisms on resou...

  7. Separations technologies supporting the development of a deployable ATW system

    International Nuclear Information System (INIS)

    Laidler, J. J.

    2000-01-01

    A program has been initiated for the purpose of developing the chemical separations technologies necessary to support a large Accelerator Transmutation of Waste (ATW) system capable of dealing with the projected inventory of spent fuel from the commercial nuclear power stations in the United States. The first several years of the program will be directed toward an elucidation of related technical issues and to the establishment, by means of comprehensive trade studies, of an optimum configuration of the elements of the chemical processing infrastructure required for support of the total ATW system. By adopting this sort of disciplined systems engineering approach, it is expected that development and demonstration costs can be minimized and that it will be possible to deploy an ATW system that is an environmentally sound and economically viable venture

  8. Use of Docker for deployment and testing of astronomy software

    Science.gov (United States)

    Morris, D.; Voutsinas, S.; Hambly, N. C.; Mann, R. G.

    2017-07-01

    We describe preliminary investigations of using Docker for the deployment and testing of astronomy software. Docker is a relatively new containerization technology that is developing rapidly and being adopted across a range of domains. It is based upon virtualization at operating system level, which presents many advantages in comparison to the more traditional hardware virtualization that underpins most cloud computing infrastructure today. A particular strength of Docker is its simple format for describing and managing software containers, which has benefits for software developers, system administrators and end users. We report on our experiences from two projects - a simple activity to demonstrate how Docker works, and a more elaborate set of services that demonstrates more of its capabilities and what they can achieve within an astronomical context - and include an account of how we solved problems through interaction with Docker's very active open source development community, which is currently the key to the most effective use of this rapidly-changing technology.

  9. Buried waste integrated demonstration FY 94 deployment plan

    International Nuclear Information System (INIS)

    Hyde, R.A.; Walker, S.; Garcia, M.M.

    1994-05-01

    The Buried Waste Integrated Demonstration (BWID) is a program funded by the U.S. Department of Energy Office of Technology Development. BWID supports the applied research, development, demonstration, testing, and evaluation of a suite of advanced technologies that together form a comprehensive remediation system for the effective and efficient remediation of buried waste. The fiscal year (FY) 1994 effort will fund thirty-eight technologies in five areas of buried waste site remediation: site characterization, waste characterization, retrieval, treatment, and containment/stabilization. This document is the basic operational planning document for deployment of all BWID projects. Discussed in this document are the BWID preparations for INEL field demonstrations, INEL laboratory demonstrations, non-INEL demonstrations, and paper studies. Each technology performing tests will prepare a test plan to detail the specific procedures, objectives, and tasks of each test. Therefore, information specific to testing each technology is intentionally omitted from this document

  10. Computer Security: How to succeed in software deployment

    CERN Multimedia

    Computer Security Team

    2014-01-01

    The summer student period has ended and we would like to congratulate all those who successfully accomplished their project! In particular, well done to those who managed to develop and deploy sophisticated web applications in the short summer season. Unfortunately, not all web applications made the final cut, moved into production and became visible on the Internet. We had to reject some... let me explain why.   Making a web application visible on the Internet requires an opening in the CERN outer perimeter firewall. Such a request is usually made through the CERN WebReq web interface. As standard procedure, the CERN Computer Security team reviews every request and performs a security assessment. This is where you, your supervisee and the Computer Security team all start to get frustrated. Many summer students delivered awesome web applications with great new functions and a good “look and feel” following precise use cases, using modern web technologies, dashboards, integr...

  11. Development and Deployment of NASA's Budget Execution Dashboard

    Science.gov (United States)

    Putz, Peter

    2009-01-01

    This paper discusses the successful implementation of a highly visible company-wide management system and its potential to change managerial and accounting policies, processes and practices in support of organizational goals. Applying the conceptual framework of innovation in organizations, this paper describes the development and deployment process of the NASA Budget Execution Dashboard and the first two fiscal years of its use. It discusses the positive organizational changes triggered by the dashboard, like higher visibility of financial goals and variances between plans and actuals, increased involvement of all management levels in tracking and correcting of plan deviations, establishing comparable data standards across a strongly diversified organization, and enhanced communication between line organizations (NASA Centers) and product organizations (Mission Directorates). The paper also discusses the critical success factors experienced in this project: Strong leadership and division of management roles, rapid and responsive technology development, and frequent communication among stakeholders.

  12. Reactor power system deployment and startup

    International Nuclear Information System (INIS)

    Wetch, J.R.; Nelin, C.J.; Britt, E.J.; Klein, G.; Rasor Associates, Inc., Sunnyvale, CA; California Institute of Technology, Pasadena)

    1985-01-01

    This paper addresses issues that should receive further examination in the near-term as concept selection for development of a U.S. space reactor power system is approached. The issues include: the economics, practicality and system reliability associated with transfer of nuclear spacecraft from low earth shuttle orbits to operational orbits, via chemical propulsion versus nuclear electric propulsion; possible astronaut supervised reactor and nuclear electric propulsion startup in low altitude Shuttle orbit; potential deployment methods for nuclear powered spacecraft from Shuttle; the general public safety of low altitude startup and nuclear safe and disposal orbits; the question of preferred reactor power level; and the question of frozen versus molten alkali metal coolant during launch and deployment. These issues must be considered now because they impact the SP-100 concept selection, power level selection, weight and size limits, use of deployable radiators, reliability requirements, and economics, as well as the degree of need for and the urgency of developing space reactor power systems. 5 references

  13. Remotely deployable aerial inspection using tactile sensors

    Science.gov (United States)

    MacLeod, C. N.; Cao, J.; Pierce, S. G.; Sullivan, J. C.; Pipe, A. G.; Dobie, G.; Summan, R.

    2014-02-01

    For structural monitoring applications, the use of remotely deployable Non-Destructive Evaluation (NDE) inspection platforms offer many advantages, including improved accessibility, greater safety and reduced cost, when compared to traditional manual inspection techniques. The use of such platforms, previously reported by researchers at the University Strathclyde facilitates the potential for rapid scanning of large areas and volumes in hazardous locations. A common problem for both manual and remote deployment approaches lies in the intrinsic stand-off and surface coupling issues of typical NDE probes. The associated complications of these requirements are obviously significantly exacerbated when considering aerial based remote inspection and deployment, resulting in simple visual techniques being the preferred sensor payload. Researchers at Bristol Robotics Laboratory have developed biomimetic tactile sensors modelled on the facial whiskers (vibrissae) of animals such as rats and mice, with the latest sensors actively sweeping their tips across the surface in a back and forth motion. The current work reports on the design and performance of an aerial inspection platform and the suitability of tactile whisking sensors to aerial based surface monitoring applications.

  14. FBR/VHTR deployment scenarios in Japan

    International Nuclear Information System (INIS)

    Richards, Matt; Kunitomi, Kazuhiko

    2008-01-01

    Co-deployment of Fast Breeder Reactors (FBRs) and Very High Temperature Reactors (VHTRs) can be used as the nuclear technologies to meet a significant portion of Japan's future energy demands. The FBR provides the fissile fuel for energy security and sustainability, and can be used to provide a significant portion of the electricity demand. The VHTR can provide flexible energy outputs (electricity, hydrogen, and high-temperature heat) with high efficiency, can operate with a wide variety of fuel cycles, and can be sited at locations that have limited availability of cooling water. These features, combined with its passive safety and high degree of proliferation resistance, make the VHTR an ideal complement for co-deployment with the FBR in Japan and also a very low-risk technology of export to foreign countries. In addition to hydrogen production, the high-temperature thermal energy produced by the VHTR fleet can be used for a wide variety of process-heat applications, and the VHTR can play a key role for significantly reducing greenhouse-gas emissions. This paper describes assessments for deploying FBRs and VHTRs in Japan using a closed fuel cycle, with the FBRs supplying the fissile material to sustain the combined FBR/VHTR fleet. (author)

  15. Hybrid deployable support truss designs for LDR

    Science.gov (United States)

    Hedgepeth, J.

    1988-01-01

    Concepts for a 20-meter diameter Large Deployable Reflector (LDR) deployable truss backup structure, and analytical predictions of its structural characteristics are discussed. The concept shown is referred to as the SIXPAC; It is a combination of the PACTRUSS concept and a single-fold beam, which would make up the desired backup structure. One advantage of retaining the PACTRUSS concept is its packaging density and its capability for synchronous deployment. Various 2-meter hexagonal panel arrangements are possible for this Hybrid PACTRUSS structure depending on the panel-to-structure attachment strategies used. Static analyses of the SIXPAC using various assumptions for truss designs and panel masses of 10 kg sq meters were performed to predict the tip displacement of the structure when supported at the center. The tip displacement ranged from 0.20 to 0.44 mm without the panel mass, and from 0.9 to 3.9 mm with the panel mass (in a 1-g field). The data indicate that the structure can be adequately ground tested to validate its required performance in space, assuming the required performance in space is approximately 100 microns. The static displacement at the tip of the structure when subjected to an angular acceleration of 0.001 rad/sec squared were estimated to range from 0.8 to 7.5 microns, depending on the type of truss elements.

  16. Evaluation of Representative Smart Grid Investment Project Technologies: Demand Response

    Energy Technology Data Exchange (ETDEWEB)

    Fuller, Jason C.; Prakash Kumar, Nirupama; Bonebrake, Christopher A.

    2012-02-14

    This document is one of a series of reports estimating the benefits of deploying technologies similar to those implemented on the Smart Grid Investment Grant (SGIG) projects. Four technical reports cover the various types of technologies deployed in the SGIG projects, distribution automation, demand response, energy storage, and renewables integration. A fifth report in the series examines the benefits of deploying these technologies on a national level. This technical report examines the impacts of a limited number of demand response technologies and implementations deployed in the SGIG projects.

  17. 16 case studies on the deployment of photovoltaic technologies in developing countries

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2003-09-15

    This report for the International Energy Agency (IEA) made by Task 9 of the Photovoltaic Power Systems (PVPS) programme presents 16 Case Studies on the deployment of photovoltaic technologies in developing countries. This guide provides information for all decision-makers in developing countries involved in the process of developing a PV project. These decision-makers can be found in institutions and host governments and also include PV project developers and sponsors, PV producers and suppliers, entrepreneurs, and NGOs. The case studies presented can help such decision-makers learn from past experience gained in the deployment of PV systems. They include experience gained in PV-related projects in various countries, including electrification, water desalination and solar home systems. Financing issues are, of course, also addressed.

  18. Final Technical Report: Commercial Advanced Lighting Control (ALC) Demonstration and Deployment

    Energy Technology Data Exchange (ETDEWEB)

    Arnold, Gabe [Efficiency Forward, Inc. / DesignLights Consortium

    2018-02-05

    This three-year demonstration and deployment project sought to address market barriers to accelerating the adoption of Advanced Lighting Controls (ALCs), an underutilized technology with low market penetration. ALCs are defined as networked, addressable lighting control systems that utilize software or intelligent controllers to combine multiple energy-saving lighting control strategies in a single space (e.g., smart-time scheduling, daylight harvesting, task tuning, occupancy control, personal control, variable load-shedding, and plug-load control). The networked intelligent aspect of these systems allows applicable lighting control strategies to be combined in a single space, layered over one another, maximizing overall energy-savings. The project included five real building demonstrations of ALCs across the Northeast US region. The demonstrations provided valuable data and experience to support deployment tasks that are necessary to overcome market barriers. These deployment tasks included development of training resources for building designers, installers, and trades, as well as development of new energy efficiency rebates for the technology from Efficiency Forward’s utility partners. Educating designers, installers, and trades on ALCs is a critical task for reducing the cost of the technology that is currently inflated due to perceived complexity and unfamiliarity with how to design and install the systems. Further, utility and non-utility energy efficiency programs continue to relegate the technology to custom or ill-suited prescriptive program designs that do not effectively deploy the technology at scale. This project developed new, scalable rebate approaches for the technology. Efficiency Forward utilized their DesignLights Consortium® (DLC) brand and network of 81 DLC member utilities to develop and deploy the results of the project. The outputs of the project have included five published case studies, a six-hour ALC technology training curriculum

  19. Deployment of the MARSIS Radar Antennas On-Board Mars Express

    Science.gov (United States)

    Denis, Michel; Moorhouse, A.; Smith, A.; McKay, Mike; Fischer, J.; Jayaraman, P.; Mounzer, Z.; Schmidt, R.; Reddy, J.; Ecale, E.; hide

    2006-01-01

    On the first European planetary mission, the deployment of the two 20-meter long MARSIS antennas onboard the ESA Mars Express spacecraft has represented an unprecedented technological challenge, in the middle of a successful science mission. While Mars Express was already performing regular observations at Mars, a complex process has been performed on Earth, involving the ESA Project, coordination between ESA, NASA and ASI, the Mars Science community, the spacecraft manufacturer EADS Astrium and the Mission Control Centre at ESOC. This paper describes the steps that led from an initial nogo in 2004 to deployment one year later, as well as the conditions and difficulties encountered during the actual deployment. It provides insights in the technical and managerial processes that made it a success, and analyses the rationale behind the decisions.

  20. Mechanically-Deployed Hypersonic Decelerator and Conformal Ablator Technologies for Mars Missions

    Science.gov (United States)

    Venkatapathy, Ethiraj; Wercinski, Paul F.; Beck, Robin A. S.; Hamm, Kenneth R.; Yount, Bryan C.; Makino, A.; Smith, B.; Gage, P.; Prabhu, D.

    2012-01-01

    The concept of a mechanically deployable hypersonic decelerator, developed initially for high mass (40 MT) human Mars missions, is currently funded by OCT for technology maturation. The ADEPT (Adaptive, Deployable Entry and Placement Technology) project has broad, game-changing applicability to in situ science missions to Venus, Mars, and the Outer Planets. Combined with maturation of conformal ablator technology (another current OCT investment), the two technologies provide unique low mass mission enabling capabilities otherwise not achievable by current rigid aeroshell or by inflatables. If this abstract is accepted, we will present results that illustrate the mission enabling capabilities of the mechanically deployable architecture for: (1) robotic Mars (Discovery or New Frontiers class) in the near term; (2) alternate approaches to landing MSL-class payloads, without the need for supersonic parachute or lifting entry, in the mid-term; and (3) Heavy mass and human missions to Mars in the long term.

  1. Modernization projects in Santa Maria e Garona

    International Nuclear Information System (INIS)

    Marcos, R.; Alutiz, J. I.; Garcia Sanchez, M.

    2011-01-01

    This article shows a vision of the Santa Maria de Garona power Plant modernization guidelines and it also presents the most significant projects deployed in the last decade at the power plant grouped in mechanics projects, electrical projects, instrumentations projects and IT projects. At the same time three projects are explained in more detail: the change of one of the main transformers, the evolution from paper recorders to paperless video graphic recorders and the new plant data information system. (Author)

  2. Fundamentals of 3D Deployable Mechanisms in Space

    Data.gov (United States)

    National Aeronautics and Space Administration — Fundamentals of 3D Deployable Origami Structures in Space The primary objectives of my research are to study the application of 3D deployable origami structures in...

  3. STEP flight experiments Large Deployable Reflector (LDR) telescope

    Science.gov (United States)

    Runge, F. C.

    1984-01-01

    Flight testing plans for a large deployable infrared reflector telescope to be tested on a space platform are discussed. Subsystem parts, subassemblies, and whole assemblies are discussed. Assurance of operational deployability, rigidization, alignment, and serviceability will be sought.

  4. Elastic Deployable Composite Tubular Roll-Out Boom, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — Deployable Space Systems (DSS) has developed an affordable and ultra-lightweight elastically self-deployable Roll-Out Boom technology that provides affordability and...

  5. Psychiatric Effects of Military Deployment on Children and Families

    Science.gov (United States)

    James, Trenton

    2012-01-01

    Deployments in the United States military have increased greatly in the past 10 years. Families and children are psychiatrically affected by these deployments, and recent studies are clarifying these effects. This article focuses on the psychiatric effects of deployment on children and uses a composite case example to review the use of play therapy to treat children who are having psychiatric issues related to the deployment of one or both parents. PMID:22468239

  6. Deployment-related risk factors of low back pain

    DEFF Research Database (Denmark)

    Nissen, Lars Ravnborg; Marott, Jacob Louis; Gyntelberg, Finn

    2014-01-01

    Where much is known about the consequences of spinal and low back pain (LBP) during military deployments, there is lesser knowledge of risk factors for LBP among the deployed forces. The objective of this study was to identify deployment-related exposures associated with LBP. The study was a ques...... their subordinates and involve medical personnel, especially deployed physiotherapists, by giving advice to soldiers of different military occupational specialties on how to optimize ergonomics at work....

  7. Design aspects of a deployable tensegrity-hollow-rope footbridge

    OpenAIRE

    Rhode-Barbarigos , Landolf; Bel Hadj Ali , Nizar; Motro , René; Smith , Ian F.C.

    2012-01-01

    International audience; Tensegrity structures are composed of cables and struts in a pre-stressed self-equilibrium. Although tensegrity first appeared in the 1950s, it is seldom used in civil engineering. This paper focuses on the design aspects of a deployable tensegrity-hollow-rope footbridge. Deployment is usually not a critical design case for traditional deployable structures. However, for tensegrity systems deployment may be critical due to the actuation required. In this paper, deploym...

  8. Automated vehicle identification tags in San Antonio : lessons learned from the metropolitan model deployment initiative : unique method for collecting arterial travel speed information

    Science.gov (United States)

    2000-10-01

    This report demonstrates a unique solution to the challenge of providing accurate, timely estimates of arterial travel times to the motoring public. In particular, it discusses the lessons learned in deploying the Vehicle Tag Project in San Antonio, ...

  9. EDITORIAL Wireless sensor networks: design for real-life deployment and deployment experiences Wireless sensor networks: design for real-life deployment and deployment experiences

    Science.gov (United States)

    Gaura, Elena; Roedig, Utz; Brusey, James

    2010-12-01

    Wireless sensor networks (WSNs) are among the most promising technologies of the new millennium. The opportunities afforded by being able to program networks of small, lightweight, low-power, computation- and bandwidth-limited nodes have attracted a large community of researchers and developers. However, the unique set of capabilities offered by the technology produces an exciting but complex design space, which is often difficult to negotiate in an application context. Deploying sensing physical environments produces its own set of challenges, and can push systems into failure modes, thus revealing problems that can be difficult to discover or reproduce in simulation or the laboratory. Sustained efforts in the area of wireless networked sensing over the last 15 years have resulted in a large number of theoretical developments, substantial practical achievements, and a wealth of lessons for the future. It is clear that in order to bridge the gap between (on the one hand) visions of very large scale, autonomous, randomly deployed networks and (on the other) the actual performance of fielded systems, we need to view deployment as an essential component in the process of developing sensor networks: a process that includes hardware and software solutions that serve specific applications and end-user needs. Incorporating deployment into the design process reveals a new and different set of requirements and considerations, whose solutions require innovative thinking, multidisciplinary teams and strong involvement from end-user communities. This special feature uncovers and documents some of the hurdles encountered and solutions offered by experimental scientists when deploying and evaluating wireless sensor networks in situ, in a variety of well specified application scenarios. The papers specifically address issues of generic importance for WSN system designers: (i) data quality, (ii) communications availability and quality, (iii) alternative, low-energy sensing

  10. I-15 integrated corridor management system : project management plan.

    Science.gov (United States)

    2011-06-01

    The Project Management Plan (PMP) assists the San Diego ICM Team by defining a procedural framework for : management and control of the I-15 Integrated Corridor Management Demonstration Project, and development and : deployment of the ICM System. The...

  11. Alignment and phasing of deployable telescopes

    Science.gov (United States)

    Woolf, N. J.; Ulich, B. L.

    1983-01-01

    The experiences in coaligning and phasing the Multi-Mirror Telescope (MMT), together with studies in setting up radio telescopes, are presented. These experiences are discussed, and on the basis they furnish, schemes are suggested for coaligning and phasing four large future telescopes with complex primary mirror systems. These telescopes are MT2, a 15-m-equivalent MMT, the University of California Ten Meter Telescope, the 10 m sub-mm wave telescope of the University of Arizona and the Max Planck Institute for Radioastronomy, and the Large Deployable Reflector, a future space telescope for far-IR and sub-mm waves.

  12. Large Deployable Reflector (LDR) feasibility study update

    Science.gov (United States)

    Alff, W. H.; Banderman, L. W.

    1983-01-01

    In 1982 a workshop was held to refine the science rationale for large deployable reflectors (LDR) and develop technology requirements that support the science rationale. At the end of the workshop, a set of LDR consensus systems requirements was established. The subject study was undertaken to update the initial LDR study using the new systems requirements. The study included mirror materials selection and configuration, thermal analysis, structural concept definition and analysis, dynamic control analysis and recommendations for further study. The primary emphasis was on the dynamic controls requirements and the sophistication of the controls system needed to meet LDR performance goals.

  13. Quality function deployment: application to rehabilitation services.

    Science.gov (United States)

    Einspruch, E M; Omachonu, V K; Einspruch, N G

    1996-01-01

    Describes how the challenge of providing rehabilitative services at reasonable costs is beginning to mount. The management of quality in rehabilitative services is therefore gaining increasing attention in the health care arena. States that if a link is implied between the above stated goal and customer satisfaction, it is imperative to evaluate quality or customer satisfaction in the context of the patient's experience. Describes the quality function deployment (QFD) system and how it leads to a better understanding of the customer's needs and wants. Explores the process of applying the concept of QFD to physical therapy.

  14. Pre-deployment dissociation and personality as risk factors for post-deployment post-traumatic stress disorder in Danish soldiers deployed to Afghanistan

    DEFF Research Database (Denmark)

    Ponce de León, Beatriz; Andersen, Søren; Karstoft, Karen Inge

    2018-01-01

    Objective: This study investigated whether pre-deployment dissociation was associated with previously identified post-traumatic stress disorder (PTSD) symptom trajectories from before to 2.5 years after military deployment. Furthermore, it examined whether the tendency to dissociate, pre-deployme......Objective: This study investigated whether pre-deployment dissociation was associated with previously identified post-traumatic stress disorder (PTSD) symptom trajectories from before to 2.5 years after military deployment. Furthermore, it examined whether the tendency to dissociate, pre...

  15. Deployment of Wind Turbines in the Built Environment: Risks, Lessons, and Recommended Practices

    Energy Technology Data Exchange (ETDEWEB)

    Fields, Jason [National Renewable Energy Lab. (NREL), Golden, CO (United States); Oteri, Frank [National Renewable Energy Lab. (NREL), Golden, CO (United States); Preus, Robert [National Renewable Energy Lab. (NREL), Golden, CO (United States); Baring-Gould, Ian [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2016-06-01

    Built-environment wind turbine (BEWT) projects are wind energy projects that are constructed on, in, or near buildings. These projects present an opportunity for distributed, low-carbon generation combined with highly visible statements on sustainability, but the BEWT niche of the wind industry is still developing and is relatively less mature than the utility-scale wind or traditional distributed wind sectors. The findings from this report cannot be extended to wind energy deployments in general because of the large difference in application and technology maturity. This paper investigates the current state of the BEWT industry by reviewing available literature on BEWT projects as well as interviewing project owners on their experiences deploying and operating the technology. The authors generated a series of case studies that outline the pertinent project details, project outcomes, and lessons learned. This paper integrates those information sources into recommended practices that can be utilized by future stakeholders to evaluate the feasibility of BEWTs for their unique applications and sites.

  16. Development and modeling of self-deployable structures

    Science.gov (United States)

    Neogi, Depankar

    Deployable space structures are prefabricated structures which can be transformed from a closed, compact configuration to a predetermined expanded form in which they are stable and can bear loads. The present research effort investigates a new family of deployable structures, called the Self-Deployable Structures (SDS). Unlike other deployable structures, which have rigid members, the SDS members are flexible while the connecting joints are rigid. The joints store the predefined geometry of the deployed structure in the collapsed state. The SDS is stress-free in both deployed and collapsed configurations and results in a self-standing structure which acquires its structural properties after a chemical reaction. Reliability of deployment is one of the most important features of the SDS, since it does not rely on mechanisms that can lock during deployment. The unit building block of these structures is the self-deployable structural element (SDSE). Several SDSE members can be linked to generate a complex building block such as a triangular or a tetrahedral structure. Different SDSE and SDS concepts are investigated in the research work, and the performance of SDS's are experimentally and theoretically explored. Triangular and tetrahedral prototype SDS have been developed and presented. Theoretical efforts include modeling the behavior of 2-dimensional SDSs. Using this design tool, engineers can study the effects of different packing configurations and deployment sequence; and perform optimization on the collapsed state of a structure with different external constraints. The model also predicts if any lockup or entanglement occurs during deployment.

  17. The effect of military deployment on mental health

    DEFF Research Database (Denmark)

    Lyk-Jensen, Stéphanie; Weatherall, Cecilie Dohlmann; W. Jepsen, Peter

    for the non-deployed eligible men, and our results hold to various robustness checks. Our administrative records provide objective measures of mental health service use in the form of psychiatric diagnoses and purchase of mental health-related medication. The very rich data makes it possible to control......In this paper we estimate the causal effect of military deployment on soldiers’ mental health. To handle the selection bias problem, we use longitudinal data for deployed and non-deployed eligible men in a difference-in-differences setting. Using pair-wise matching, we impute deployment dates...... for important variables like intelligence tests and family background. We find significant adverse effects of military deployment on soldiers’ mental health service use. Highlights: - Causal effect of military deployment on soldiers’ use of mental health service - Using a difference-in-differences approach...

  18. Heterogeneous Deployment Analysis for Cost-Effective Mobile Network Evolution

    DEFF Research Database (Denmark)

    Coletti, Claudio

    2013-01-01

    network coverage and boosting network capacity in traffic hot-spot areas. The thesis deals with the deployment of both outdoor small cells and indoor femto cells. Amongst the outdoor solution, particular emphasis is put on relay base stations as backhaul costs can be reduced by utilizing LTE spectrum...... statistical models of deployment areas, the performance analysis is carried out in the form of operator case studies for large-scale deployment scenarios, including realistic macro network layouts and inhomogeneous spatial traffic distributions. Deployment of small cells is performed by means of proposed...... heuristic deployment algorithms, which combine network coverage and spatial user density information. As a secondary aspect, deployment solutions achieving the same coverage performance are compared in terms of Total Cost of Ownership (TCO), in order to investigate the viability of different deployment...

  19. Integrated assessment of dispersed energy resources deployment

    Energy Technology Data Exchange (ETDEWEB)

    Marnay, Chris; Blanco, Raquel; Hamachi, Kristina S.; Kawaan, Cornelia P.; Osborn, Julie G.; Rubio, F. Javier

    2000-06-01

    The goal of this work is to create an integrated framework for forecasting the adoption of distributed energy resources (DER), both by electricity customers and by the various institutions within the industry itself, and for evaluating the effect of this adoption on the power system, particularly on the overall reliability and quality of electrical service to the end user. This effort and follow on contributions are intended to anticipate and explore possible patterns of DER deployment, thereby guiding technical work on microgrids towards the key technical problems. An early example of this process addressed is the question of possible DER adopting customer disconnection. A deployment scenario in which many customers disconnect from their distribution company (disco) entirely leads to a quite different set of technical problems than a scenario in which customers self generate a significant share or all of their on-site electricity requirements and additionally buy and sell energy and ancillary services (AS) locally and/or into wider markets. The exploratory work in this study suggests that the economics under which customers disconnect entirely are unlikely.

  20. Hadoop Cluster Deployment: A Methodological Approach

    Directory of Open Access Journals (Sweden)

    Ronaldo Celso Messias Correia

    2018-05-01

    Full Text Available For a long time, data has been treated as a general problem because it just represents fractions of an event without any relevant purpose. However, the last decade has been just about information and how to get it. Seeking meaning in data and trying to solve scalability problems, many frameworks have been developed to improve data storage and its analysis. As a framework, Hadoop was presented as a powerful tool to deal with large amounts of data. However, it still causes doubts about how to deal with its deployment and if there is any reliable method to compare the performance of distinct Hadoop clusters. This paper presents a methodology based on benchmark analysis to guide the Hadoop cluster deployment. The experiments employed The Apache Hadoop and the Hadoop distributions of Cloudera, Hortonworks, and MapR, analyzing the architectures on local and on clouding—using centralized and geographically distributed servers. The results show the methodology can be dynamically applied on a reliable comparison among different architectures. Additionally, the study suggests that the knowledge acquired can be used to improve the data analysis process by understanding the Hadoop architecture.

  1. Regional Energy Deployment System (ReEDS)

    Energy Technology Data Exchange (ETDEWEB)

    Short, W.; Sullivan, P.; Mai, T.; Mowers, M.; Uriarte, C.; Blair, N.; Heimiller, D.; Martinez, A.

    2011-12-01

    The Regional Energy Deployment System (ReEDS) is a deterministic optimization model of the deployment of electric power generation technologies and transmission infrastructure throughout the contiguous United States into the future. The model, developed by the National Renewable Energy Laboratory's Strategic Energy Analysis Center, is designed to analyze the critical energy issues in the electric sector, especially with respect to potential energy policies, such as clean energy and renewable energy standards or carbon restrictions. ReEDS provides a detailed treatment of electricity-generating and electrical storage technologies and specifically addresses a variety of issues related to renewable energy technologies, including accessibility and cost of transmission, regional quality of renewable resources, seasonal and diurnal generation profiles, variability of wind and solar power, and the influence of variability on the reliability of the electrical grid. ReEDS addresses these issues through a highly discretized regional structure, explicit statistical treatment of the variability in wind and solar output over time, and consideration of ancillary services' requirements and costs.

  2. Dynamic analysis of the large deployable reflector

    Science.gov (United States)

    Calleson, Robert E.; Scott, A. Don

    1987-01-01

    The Large Deployable Reflector (LDR) is to be an astronomical observatory orbiting above Earth's obscuring atmosphere and operating in the spectral range between 30 microns and 1000 microns wavelength. The LDR will be used to study such astronomical phenomena as stellar and galactic formation, cosmology, and planetary atmospheres. The LDR will be the first observatory to be erected and assembled in space. This distinction brings with it several major technological challenges such as the development of ultra-lightweight deployable mirrors, advanced mirror fabrication techniques, advanced structures, and control of vibrations due to various sources of excitation. The purpose of this analysis is to provide an assessment of the vibrational response due to secondary mirror chopping and LDR slewing. The dynamic response of two 20-m LDR configurations was studied. Two mirror support configurations were investigated for the Ames concept, the first employs a six-strut secondary mirror support structure, while the second uses a triple-bipod support design. All three configurations were modeled using a tetrahedral truss design for the primary mirror support structure. Response resulting from secondary mirror chopping was obtained for the two Ames configurations, and the response of the primary mirror from slewing was obtained for all three configurations.

  3. Scenario study on the FBR deployment

    International Nuclear Information System (INIS)

    Ono, Kiyoshi; Kofuji, Hirohide; Otaki, Akira; Yonezawa, Shigeaki; Shinoda, Yoshihiko; Hirao, Kazunori; Ikegami, Tetsuo

    2000-12-01

    This study on success scenarios for the Fast Breeder Reactor (FBR) deployment was performed taking account of future situation of fossil, renewable and nuclear energies in Japan as well as the world from the viewpoints of the following four items; economics, environment, energy security and restriction of natural uranium resources. In the economics scenario, if carbon tax is added to generating cost of LNG, coal and oil and the economics of FBR cycle is competitive with LWR cycle in the future, FBR cycle will be expected to introduce as the middle and base load power plant. In the environment scenario, there is also any possibility that FBR cycle which can burn and transmute minor actinide and fission product elements will be introduced in order to reduce the burden of deposit facility and the toxicity of high-level waste. In the uranium resources restriction scenario, FBR cycle needs to be deployed at the latest in the middle of 21st century from the viewpoint of the restriction of natural uranium resources. This study was carried out in a part of JNC's feasibility study on commercialized FBR cycle system. (author)

  4. The medical software quality deployment method.

    Science.gov (United States)

    Hallberg, N; Timpka, T; Eriksson, H

    1999-03-01

    The objective of this study was to develop a Quality Function Deployment (QFD) model for design of information systems in health-care environments. Consecutive blocked-subject case studies were conducted, based on action research methods. Starting with a QFD model for software development, a model for information system design, the Medical Software Quality Deployment (MSQD) model, was developed. The MSQD model was divided into the pre-study phase, in which the customer categories and their power to influence the design are determined; the data collection phase, in which the voice of customers (VoC) is identified by observations and interviews and quantified by Critical. Incident questionnaires; the need specification phase, where the VoC is specified into ranked customer needs; and the design phase where the customer needs are transformed stepwise to technical requirements and design attributes. QFD showed to be useful for integrating the values of different customer categories in software development for health-care settings. In the later design phases, other quality methods should be used for software implementation and testing.

  5. Economic Conditions and Factors Affecting New Nuclear Power Deployment

    Energy Technology Data Exchange (ETDEWEB)

    Harrison, Thomas J [ORNL

    2014-10-01

    This report documents work performed in support of the US Department of Energy Office of Nuclear Energy’s Advanced Small Modular Reactor (AdvSMR) program. The report presents information and results from economic analyses to describe current electricity market conditions and those key factors that may impact the deployment of AdvSMRs or any other new nuclear power plants. Thus, this report serves as a reference document for DOE as it moves forward with its plans to develop advanced reactors, including AdvSMRs. For the purpose of this analysis, information on electricity markets and nuclear power plant operating costs will be combined to examine the current state of the nuclear industry and the process required to successfully move forward with new nuclear power in general and AdvSMRs in particular. The current electricity market is generally unfavorable to new nuclear construction, especially in deregulated markets with heavy competition from natural gas and subsidized renewables. The successful and profitable operation of a nuclear power plant (or any power plant) requires the rate at which the electricity is sold to be sufficiently greater than the cost to operate. The wholesale rates in most US markets have settled into values that provide profits for most operating nuclear power plants but are too low to support the added cost of capital recovery for new nuclear construction. There is a strong geographic dependence on the wholesale rate, with some markets currently able to support new nuclear construction. However, there is also a strong geographic dependence on pronuclear public opinion; the areas where power prices are high tend to have unfavorable views on the construction of new nuclear power plants. The use of government-backed incentives, such as subsidies, can help provide a margin to help justify construction projects that otherwise may not seem viable. Similarly, low interest rates for the project will also add a positive margin to the economic

  6. A Conceptual Design for a Small Deployer Satellite

    Science.gov (United States)

    Zumbo, S.

    2002-01-01

    In the last few years, the space scientific and industrial communities have demonstrated a renewed interest for small missions based on new categories of space platforms: micro &nano satellites. The cost reduction w.r.t. larger satellite missions, the shorter time from concept to launch, the risk distribution and the possibility to use this kind of bus both for stand-alone projects and as complementary to larger programs, are key factors that make this new kind of technology suitable for a wide range of space related activities. In particular it is now possible to conceive new mission philosophy implying the realisation of micro satellite constellations, with S/C flying in close formation to form a network of distributed sensors either for near-real time telecommunication or Earth remote sensing and disaster monitoring systems or physics and astronomical researches for Earth-Sun dynamics and high energy radiation studies. At the same time micro satellite are becoming important test- beds for new technologies that will eventually be used on larger missions, with relevant spin-offs potentialities towards other industrial fields. The foreseen social and economical direct benefits, the reduced mission costs and the possibility even for a small skilled team to manage all the project, represent very attractive arguments for universities and research institutes to invest funds and human resources to get first order technical and theoretical skills in the field of micro satellite design, with important influences on the training programs of motivated students that are directly involved in all the project's phases. In consideration of these space market important new trends and of the academic benefits that could be guaranteed by undertaking a micro satellite mission project, basing on its long space activities heritage, University of Rome "La Sapienza" - Aerospace and Astronautics Department, with the support of the Italian Space Agency, Alenia Spazio and of important

  7. Buried Waste Integrated Demonstration FY-95 Deployment Plan

    Energy Technology Data Exchange (ETDEWEB)

    Stacey, D.E.

    1995-03-01

    The Buried Waste Integrated Demonstration (BWID) is a program funded by the U.S. Department of Energy Office of Technology Development. BWID supports the applied research, development, demonstration, testing, and evaluation of a suite of advanced technologies that together form a comprehensive remediation system for the effective and efficient remediation of buried waste. The FY-95 effort will fund 24 technologies in five areas of buried waste site remediation: site characterization, waste characterization, retrieval, treatment, and containment/stabilization. Ten of these technologies will take part in the integrated field demonstration that will take place at the Idaho National Engineering Laboratory (INEL) facilities in the summer of 1995. This document is the basic operational planning document for deployment of all BWID projects funded in FY-95. Discussed in this document are the BWID preparations for the INEL integrated field demonstration, INEL research and development (R&D) demonstrations, non-INEL R&D demonstrations, and office research and technical review meetings. Each project will have a test plan detailing the specific procedures, objectives, and tasks of the test. Therefore, information that is specific to testing each technology is intentionally limited in this document.

  8. Buried Waste Integrated Demonstration FY-95 Deployment Plan

    International Nuclear Information System (INIS)

    Stacey, D.E.

    1995-03-01

    The Buried Waste Integrated Demonstration (BWID) is a program funded by the U.S. Department of Energy Office of Technology Development. BWID supports the applied research, development, demonstration, testing, and evaluation of a suite of advanced technologies that together form a comprehensive remediation system for the effective and efficient remediation of buried waste. The FY-95 effort will fund 24 technologies in five areas of buried waste site remediation: site characterization, waste characterization, retrieval, treatment, and containment/stabilization. Ten of these technologies will take part in the integrated field demonstration that will take place at the Idaho National Engineering Laboratory (INEL) facilities in the summer of 1995. This document is the basic operational planning document for deployment of all BWID projects funded in FY-95. Discussed in this document are the BWID preparations for the INEL integrated field demonstration, INEL research and development (R ampersand D) demonstrations, non-INEL R ampersand D demonstrations, and office research and technical review meetings. Each project will have a test plan detailing the specific procedures, objectives, and tasks of the test. Therefore, information that is specific to testing each technology is intentionally limited in this document

  9. Assessment of target markets for deployment of modular HTGRs

    International Nuclear Information System (INIS)

    Richards, M.; Hamilton, C.; Venneri, F.

    2014-01-01

    The Next Generation Nuclear Plant (NGNP) Industry Alliance (NIA) consists of 16 companies and organizations that support development and deployment of modular High Temperature Gas-Cooled Reactors (modular HTGRs or MHRs). These companies include reactor vendors, utilities, potential industrial end users of MHR process steam/heat, nuclear graphite vendors, and companies with design, technology development, regulatory licensing, and other HTGR subject matter expertise. The NIA has been investigating potential markets for MHRs in both North America and globally as part of its business plan development. MHRs have inherent, melt-down proof safety with high-temperature capability and high utilization of the nuclear heat for production of electricity and process heat. These features allow MHRs to be located within close proximity to the public and industrial end users, and in locations with very limited or no availability of cooling water as the ultimate heat sink. This paper provides a summary of recent NIA target market assessments, including selected markets which currently utilize high value oil and expensive liquefied natural gas (LNG) fuels for process heat and electricity generation on a large scale (e.g., Kingdom of Saudi Arabia, Japan, and Korea). Results show that significant markets exist today for economical deployment of steam-cycle MHRs for electricity and process heat, especially in countries/regions that utilize expensive (or heavily subsidized) fossil fuels for energy needs. Low natural gas prices in North America presently inhibit expansion of any nuclear technology, but MHRs should be economically competitive by the 2030 - 2040 time frame, when natural gas prices are projected to be in the $7 to $10 per MMBtu price range. There is also good market potential for higher temperature MHR applications, including nuclear steel manufacturing, production of synthetic fuels, and hydrogen production. (author)

  10. Assessment of target markets for deployment of modular HTGRs

    Energy Technology Data Exchange (ETDEWEB)

    Richards, M.; Hamilton, C.; Venneri, F., E-mail: mrichards@ultrasafe-nuclear.com, E-mail: chamilton@ultrasafe-nuclear.com, E-mail: fvenneri@ultrasafe-nuclear.com [Ultra Safe Nuclear Corp., Los Alamos, NM (United States)

    2014-07-01

    The Next Generation Nuclear Plant (NGNP) Industry Alliance (NIA) consists of 16 companies and organizations that support development and deployment of modular High Temperature Gas-Cooled Reactors (modular HTGRs or MHRs). These companies include reactor vendors, utilities, potential industrial end users of MHR process steam/heat, nuclear graphite vendors, and companies with design, technology development, regulatory licensing, and other HTGR subject matter expertise. The NIA has been investigating potential markets for MHRs in both North America and globally as part of its business plan development. MHRs have inherent, melt-down proof safety with high-temperature capability and high utilization of the nuclear heat for production of electricity and process heat. These features allow MHRs to be located within close proximity to the public and industrial end users, and in locations with very limited or no availability of cooling water as the ultimate heat sink. This paper provides a summary of recent NIA target market assessments, including selected markets which currently utilize high value oil and expensive liquefied natural gas (LNG) fuels for process heat and electricity generation on a large scale (e.g., Kingdom of Saudi Arabia, Japan, and Korea). Results show that significant markets exist today for economical deployment of steam-cycle MHRs for electricity and process heat, especially in countries/regions that utilize expensive (or heavily subsidized) fossil fuels for energy needs. Low natural gas prices in North America presently inhibit expansion of any nuclear technology, but MHRs should be economically competitive by the 2030 - 2040 time frame, when natural gas prices are projected to be in the $7 to $10 per MMBtu price range. There is also good market potential for higher temperature MHR applications, including nuclear steel manufacturing, production of synthetic fuels, and hydrogen production. (author)

  11. Clean Coal Technologies - Accelerating Commerical and Policy Drivers for Deployment

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2008-07-01

    Coal is and will remain the world's most abundant and widely distributed fossil fuel. Burning coal, however, can pollute and it produces carbon dioxide. Clean coal technologies address this problem. The widespread deployment of pollution-control equipment to reduce sulphur dioxide, Nox and dust emissions from industry is just one example which has brought cleaner air to many countries. Since the 1970s, various policy and regulatory measures have created a growing commercial market for these clean coal technologies, with the result that costs have fallen and performance has improved. More recently, the need to tackle rising CO2 emissions to address climate change means that clean coal technologies now extend to include those for CO2 capture and storage (CCS). This short report from the IEA Coal Industry Advisory Board (CIAB) presents industry's considered recommendations on how to accelerate the development and deployment of this important group of new technologies and to grasp their very signifi cant potential to reduce emissions from coal use. It identifies an urgent need to make progress with demonstration projects and prove the potential of CCS through government-industry partnerships. Its commercialisation depends upon a clear legal and regulatory framework,public acceptance and market-based financial incentives. For the latter, the CIAB favours cap-and-trade systems, price supports and mandatory feed-in tariffs, as well as inclusion of CCS in the Kyoto Protocol's Clean Development Mechanism to create demand in developing economies where coal use is growing most rapidly. This report offers a unique insight into the thinking of an industry that recognises both the threats and growing opportunities for coal in a carbon constrained world.

  12. Deployment and Evaluation of an Observations Data Model

    Science.gov (United States)

    Horsburgh, J. S.; Tarboton, D. G.; Zaslavsky, I.; Maidment, D. R.; Valentine, D.

    2007-12-01

    Environmental observations are fundamental to hydrology and water resources, and the way these data are organized and manipulated either enables or inhibits the analyses that can be performed. The CUAHSI Hydrologic Information System project is developing information technology infrastructure to support hydrologic science. This includes an Observations Data Model (ODM) that provides a new and consistent format for the storage and retrieval of environmental observations in a relational database designed to facilitate integrated analysis of large datasets collected by multiple investigators. Within this data model, observations are stored with sufficient ancillary information (metadata) about the observations to allow them to be unambiguously interpreted and used, and to provide traceable heritage from raw measurements to useable information. The design is based upon a relational database model that exposes each single observation as a record, taking advantage of the capability in relational database systems for querying based upon data values and enabling cross dimension data retrieval and analysis. This data model has been deployed, as part of the HIS Server, at the WATERS Network test bed observatories across the U.S where it serves as a repository for real time data in the observatory information system. The ODM holds the data that is then made available to investigators and the public through web services and the Data Access System for Hydrology (DASH) map based interface. In the WATERS Network test bed settings the ODM has been used to ingest, analyze and publish data from a variety of sources and disciplines. This paper will present an evaluation of the effectiveness of this initial deployment and the revisions that are being instituted to address shortcomings. The ODM represents a new, systematic way for hydrologists, scientists, and engineers to organize and share their data and thereby facilitate a fuller integrated understanding of water resources based on

  13. Clean Coal Technologies - Accelerating Commerical and Policy Drivers for Deployment

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2008-07-01

    Coal is and will remain the world's most abundant and widely distributed fossil fuel. Burning coal, however, can pollute and it produces carbon dioxide. Clean coal technologies address this problem. The widespread deployment of pollution-control equipment to reduce sulphur dioxide, Nox and dust emissions from industry is just one example which has brought cleaner air to many countries. Since the 1970s, various policy and regulatory measures have created a growing commercial market for these clean coal technologies, with the result that costs have fallen and performance has improved. More recently, the need to tackle rising CO2 emissions to address climate change means that clean coal technologies now extend to include those for CO2 capture and storage (CCS). This short report from the IEA Coal Industry Advisory Board (CIAB) presents industry's considered recommendations on how to accelerate the development and deployment of this important group of new technologies and to grasp their very signifi cant potential to reduce emissions from coal use. It identifies an urgent need to make progress with demonstration projects and prove the potential of CCS through government-industry partnerships. Its commercialisation depends upon a clear legal and regulatory framework,public acceptance and market-based financial incentives. For the latter, the CIAB favours cap-and-trade systems, price supports and mandatory feed-in tariffs, as well as inclusion of CCS in the Kyoto Protocol's Clean Development Mechanism to create demand in developing economies where coal use is growing most rapidly. This report offers a unique insight into the thinking of an industry that recognises both the threats and growing opportunities for coal in a carbon constrained world.

  14. Strategies for the deployment of micro-generation: Implications for social acceptance

    International Nuclear Information System (INIS)

    Sauter, Raphael; Watson, Jim

    2007-01-01

    Social acceptance of renewable energy innovation has often been discussed in the context of large renewable technology projects, acceptance having been seen as rather passive consent by the public. The potential importance of micro-generation technologies in the future energy supply mix and policymakers' increasing attention to these technologies requires a different approach to the social acceptance of renewable energy innovation and energy infrastructure technologies. Instead of mere consent to an infrastructure project, domestic micro-generation requires active acceptance by homeowners, whereby individual households become part of the electricity supply infrastructure. Acceptance may therefore be expressed in various forms: attitudes, behaviour and-most importantly-investments. This paper argues that different deployment models with varying degrees of company and consumer involvement will have a significant influence on the social acceptance of domestic micro-generation and therefore the market uptake of these technologies. Three deployment models are elaborated and briefly situated in the current UK energy policy context

  15. Testing the Deployment Repeatability of a Precision Deployable Boom Prototype for the Proposed SWOT Karin Instrument

    Science.gov (United States)

    Agnes, Gregory S.; Waldman, Jeff; Hughes, Richard; Peterson, Lee D.

    2015-01-01

    NASA's proposed Surface Water Ocean Topography (SWOT) mission, scheduled to launch in 2020, would provide critical information about Earth's oceans, ocean circulation, fresh water storage, and river discharge. The mission concept calls for a dual-antenna Ka-band radar interferometer instrument, known as KaRIn, that would map the height of water globally along two 50 km wide swaths. The KaRIn antennas, which would be separated by 10 meters on either side of the spacecraft, would need to be precisely deployable in order to meet demanding pointing requirements. Consequently, an effort was undertaken to design build and prototype a precision deployable Mast for the KaRIn instrument. Each mast was 4.5-m long with a required dilitation stability of 2.5 microns over 3 minutes. It required a minimum first mode of 7 Hz. Deployment repeatability was less than +/- 7 arcsec in all three rotation directions. Overall mass could not exceed 41.5 Kg including any actuators and thermal blanketing. This set of requirements meant the boom had to be three times lighter and two orders of magnitude more precise than the existing state of the art for deployable booms.

  16. Deployment and implementation of the Grundfos' sustainability strategy by means of the ecodesign maturity model

    DEFF Research Database (Denmark)

    Pigosso, Daniela Cristina Antelmi; McAloone, Tim C.; Rozenfeld, Henrique

    2014-01-01

    Companies are increasingly realizing the needs and opportunities for implementing sustainability into their business processes and corporate culture. This paper describes the approach followed by Grundfos to deploy its Sustainability Strategy for the development of Sustainable Product Solutions......, by means of the Ecodesign Maturity Model (EcoM2), which included the diagnosis of their current maturity profile, the definition of a strategic roadmap for ecodesign implementation and the implementation of the defined projects....

  17. RENBAR: Overcoming Environmental, Administrative and Socio-economic Barriers to Renewable Energy Technology Deployment. A guidebook

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2013-07-15

    IEA-RETD prepared a guidebook for policy makers and project developers, illustrating how to deal with possible negative side effects or barriers for deployment of renewable technologies, like visual or noise impacts, or increased local transport for biomass. Many good practices demonstrate that renewables can be integrated in the 'backyards' of modern societies. Some examples: stakeholder involvement, participation and compensation; clear spatial planning; and trustworthy legal procedures. Four case studies are also included.

  18. Information and communication technology platforms deployment: Technology access reaches South African rural areas

    CSIR Research Space (South Africa)

    Foko, TF

    2017-05-01

    Full Text Available though these Platforms were intended to provide unsupervised and unstructured form of learning. Fig. 1: Map showing the sites of deployed ICT Platform 2. Objectives The container Platform project rolled out ICT Platforms for the following purposes...: (i) As information and communication resources; (ii) As learning centres; (iii) As access points to ICTs; (iv) As practical tools for development; and (v) As a tool for bridging the digital Divide. Therefore, the purpose of this paper...

  19. An innovation management approach for renewable energy deployment. The case of solar photovoltaic (PV) technology

    International Nuclear Information System (INIS)

    Shum, Kwok L.; Watanabe, Chihiro

    2009-01-01

    In the discussion of renewable energy deployment, one key concern is the various types of barriers that renewable energy needs to overcome before it can make its way into the mainstream. These barriers increasingly shift from the technical to the economic and institutional. The most general types of barriers are due to technological 'lock-out' or to carbon 'lock-in' [. Understanding carbon lock-in. Energy Policy 28(12), 817-830 (Elsevier)]. These barriers necessitate the development of a strategic approach to deploy or introduce renewable energy technology. Existing energy policy has mostly relied upon financial subsidies, market-based instruments such as renewable portfolio standards, and production tax credits to stimulate the installation and use of equipment to generate electricity from renewable sources. These strategies target mostly system-level decisions of end users. The purpose of this paper is to present an innovation perspective on the renewable energy deployment process by introducing the innovation value-added chain (IVC) framework. The analytical objective of IVC is to evaluate the impact of a new innovation on the various stakeholders and players in the development and deployment processes. A deployment or innovation strategy that causes minimal disruption, enhances existing competencies, or expedites new learning by the players has a higher chance to succeed. We draw upon two sets of system integration costs data for grid-connected distributed photovoltaic (PV) systems in Japan and the United States and demonstrate conspicuously different dynamic learning behaviors. These two deployment models can be understood in terms of how the IVCs are organized and how PV system integration projects are performed in the field. In addition, IVC-based findings can inform the targeted application of conventional financial subsidies for learning investment not only at the PV system level, but also at the (localized) system integration level. This would involve

  20. Finding Their Way Back In: Family Reintegration Following Guard Deployment.

    Science.gov (United States)

    Messecar, Deborah C

    2017-03-01

    The aim of this study was to describe deployed National Guard members' and their families' perceptions of their experience with family reintegration, and the causes and conditions of challenges reintegration presents after deployment. A total of 26 National Guard members and 19 family members participated in individual (n = 22), couples (n = 6), or focus group (n = 17) interviews. In-depth interviews were used to assess needs and maximize input from military families regarding deployment-related experiences and reintegration issues. Qualitative coding and analysis of data were completed using NVivo. Finding their way back in is the key process that the military members must complete to successfully reestablish their desired social connections with the family and reclaim their place within the family. Several conditions shape the degree of challenges with reintegration that veterans and their family will encounter. These include preparation for deployment, length and type of deployment, communication during deployment, and finally, awareness of how deployment changes the military member and the family. Support resources dedicated to providing National Guard members and their families with assistance in preparing for deployments and educating them about the importance of communication during deployment should be maintained and expanded. Broader educational efforts that increase awareness of what to expect regarding how deployment changes the military member and the family are needed. Reprint & Copyright © 2017 Association of Military Surgeons of the U.S.

  1. Nucleus: A pilot project

    Energy Technology Data Exchange (ETDEWEB)

    Finnell, Joshua Eugene [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Klein, Martin [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Cain, Brian J. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2017-05-09

    The proposal is to provide institutional infrastructure that facilitates management of research projects, research collaboration, and management, preservation, and discovery of data. Deploying such infrastructure will amplify the effectiveness, efficiency, and impact of research, as well as assist researchers in regards to compliance with both data management mandates and LANL security policy. This will facilitate discoverability of LANL research both within the lab and external to LANL.

  2. QUALITY FUNCTION DEPLOYMENT AS A STRATEGIC PLANNINGTOOL

    Directory of Open Access Journals (Sweden)

    Burcu DEVRİM İÇTENBAŞ

    2011-07-01

    Full Text Available Quality Function Deployment (QFD uses a house of quality to translate customerrequirements into engineering specifications. QFD has been widely used as a toolto develop new products. It has been adopted in thefields of education quality,service quality, software development and marketingplanning. The tool hasrecently been applied in strategic planning .In this study authors reviewed currentresearch which uses QFD as a strategic planning tool and described how QFDmethods can be used as a robust tool in strategic planning. This study provides aninsight for strategic planners to utilize a QFD- based philosophy and the methodsare useful tools for the design of a customer-driven strategy and show how itsystematically translates vision into action, targeting opportunities and creatinginnovative strategies.

  3. OpenFlow Deployment and Concept Analysis

    Directory of Open Access Journals (Sweden)

    Tomas Hegr

    2013-01-01

    Full Text Available Terms such as SDN and OpenFlow (OF are often used in the research and development of data networks. This paper deals with the analysis of the current state of OpenFlow protocol deployment options as it is the only real representative protocol that enables the implementation of Software Defined Networking outside an academic world. There is introduced an insight into the current state of the OpenFlow specification development at various levels is introduced. The possible limitations associated with this concept in conjunction with the latest version (1.3 of the specification published by ONF are also presented. In the conclusion there presented a demonstrative security application addressing the lack of IPv6 support in real network devices since most of today's switches and controllers support only OF v1.0.

  4. Stochastic Optimization for Nuclear Facility Deployment Scenarios

    Science.gov (United States)

    Hays, Ross Daniel

    Single-use, low-enriched uranium oxide fuel, consumed through several cycles in a light-water reactor (LWR) before being disposed, has become the dominant source of commercial-scale nuclear electric generation in the United States and throughout the world. However, it is not without its drawbacks and is not the only potential nuclear fuel cycle available. Numerous alternative fuel cycles have been proposed at various times which, through the use of different reactor and recycling technologies, offer to counteract many of the perceived shortcomings with regards to waste management, resource utilization, and proliferation resistance. However, due to the varying maturity levels of these technologies, the complicated material flow feedback interactions their use would require, and the large capital investments in the current technology, one should not deploy these advanced designs without first investigating the potential costs and benefits of so doing. As the interactions among these systems can be complicated, and the ways in which they may be deployed are many, the application of automated numerical optimization to the simulation of the fuel cycle could potentially be of great benefit to researchers and interested policy planners. To investigate the potential of these methods, a computational program has been developed that applies a parallel, multi-objective simulated annealing algorithm to a computational optimization problem defined by a library of relevant objective functions applied to the Ver ifiable Fuel Cycle Simulati on Model (VISION, developed at the Idaho National Laboratory). The VISION model, when given a specified fuel cycle deployment scenario, computes the numbers and types of, and construction, operation, and utilization schedules for, the nuclear facilities required to meet a predetermined electric power demand function. Additionally, it calculates the location and composition of the nuclear fuels within the fuel cycle, from initial mining through

  5. Clean energy deployment: addressing financing cost

    International Nuclear Information System (INIS)

    Ameli, Nadia; Kammen, Daniel M

    2012-01-01

    New methods are needed to accelerate clean energy policy adoption. To that end, this study proposes an innovative financing scheme for renewable and energy efficiency deployment. Financing barriers represent a notable obstacle for energy improvements and this is particularly the case for low income households. Implementing a policy such as PACE—property assessed clean energy—allows for the provision of upfront funds for residential property owners to install electric and thermal solar systems and make energy efficiency improvements to their buildings. This paper will inform the design of better policies tailored to the creation of the appropriate conditions for such investments to occur, especially in those countries where most of the population belongs to the low–middle income range facing financial constraints. (letter)

  6. Lessons learnt from WLCG service deployment

    International Nuclear Information System (INIS)

    Shiers, J D

    2008-01-01

    This paper summarises the main lessons learnt from deploying WLCG production services, with a focus on Reliability, Scalability, Accountability, which lead to both manageability and usability. Each topic is analysed in turn. Techniques for zero-user-visible downtime for the main service interventions are described, together with pathological cases that need special treatment. The requirements in terms of scalability are analysed, calling for as much robustness and automation in the service as possible. The different aspects of accountability - which covers measuring/tracking/logging/monitoring what is going on - and has gone on - is examined, with the goal of attaining a manageable service. Finally, a simple analogy is drawn with the Web in terms of usability - what do we need to achieve to cross the chasm from small-scale adoption to ubiquity?

  7. Techno-Economics of Residential Broadband Deployment

    DEFF Research Database (Denmark)

    Sigurdsson, Halldor Matthias

    2007-01-01

    on account of their existing telecom network (”the raw copper”), and typically they will prefer an xDSL-based strategy (various types of Digital Subscriber Line-technology: ADSL, VDSL, etc.), where the rate of speed of data connections are increased gradually to 10-50 Mbit/s or even more, in order to gain...... broadband deployment strategy is depending on a complexed set of parameters, and there is a demand for precise techno-economic cost models estimating financial feasibility. The existing cost models do not consider the dynamic developments in the market caused by competition. The PhD thesis has a profound...... the general principles from the Danish LRAIC-model (Long Run Average Incremental Cost) and divides Denmark in 4 geografical profiles. Considering the existing copper-infrastructure the most advantageous strategies for the players of each of these profiles are identified. The importance of the time horizon...

  8. Rapid deployable global sensing hazard alert system

    Science.gov (United States)

    Cordaro, Joseph V; Tibrea, Steven L; Shull, Davis J; Coleman, Jerry T; Shuler, James M

    2015-04-28

    A rapid deployable global sensing hazard alert system and associated methods of operation are provided. An exemplary system includes a central command, a wireless backhaul network, and a remote monitoring unit. The remote monitoring unit can include a positioning system configured to determine a position of the remote monitoring unit based on one or more signals received from one or more satellites located in Low Earth Orbit. The wireless backhaul network can provide bidirectional communication capability independent of cellular telecommunication networks and the Internet. An exemplary method includes instructing at least one of a plurality of remote monitoring units to provide an alert based at least in part on a location of a hazard and a plurality of positions respectively associated with the plurality of remote monitoring units.

  9. Scientific data management challenges, technology and deployment

    CERN Document Server

    Rotem, Doron

    2010-01-01

    Dealing with the volume, complexity, and diversity of data currently being generated by scientific experiments and simulations often causes scientists to waste productive time. Scientific Data Management: Challenges, Technology, and Deployment describes cutting-edge technologies and solutions for managing and analyzing vast amounts of data, helping scientists focus on their scientific goals. The book begins with coverage of efficient storage systems, discussing how to write and read large volumes of data without slowing the simulation, analysis, or visualization processes. It then focuses on the efficient data movement and management of storage spaces and explores emerging database systems for scientific data. The book also addresses how to best organize data for analysis purposes, how to effectively conduct searches over large datasets, how to successfully automate multistep scientific process workflows, and how to automatically collect metadata and lineage information. This book provides a comprehensive u...

  10. Clean energy deployment: addressing financing cost

    Science.gov (United States)

    Ameli, Nadia; Kammen, Daniel M.

    2012-09-01

    New methods are needed to accelerate clean energy policy adoption. To that end, this study proposes an innovative financing scheme for renewable and energy efficiency deployment. Financing barriers represent a notable obstacle for energy improvements and this is particularly the case for low income households. Implementing a policy such as PACE—property assessed clean energy—allows for the provision of upfront funds for residential property owners to install electric and thermal solar systems and make energy efficiency improvements to their buildings. This paper will inform the design of better policies tailored to the creation of the appropriate conditions for such investments to occur, especially in those countries where most of the population belongs to the low-middle income range facing financial constraints.

  11. Time Deployment Study for Annulus Pumping

    International Nuclear Information System (INIS)

    REBERGER, D.W.

    2000-01-01

    Radioactive wastes from processing irradiated uranium fuels have been stored as alkaline slurries in underground tanks at the Hanford Site. Single-shell tanks (SST) and double-shell tanks (DST) of various sizes were used for waste storage. Of the total 177 tanks, there are 28 DSTs. DSTs are located in AN, AP, AW, AY, AZ, and SY tank farms in the 200 East (200E) and 200-West (200W) Areas. The storage capacities of the DSTs vary from 980,000 to 1,140,000 gal. DSTs are designed and constructed as an integral steel structure, i.e., an inner shell within an outer shell, so that any leak from the inner shell is confined within the annulus without impacting the environment. The inner shell provides primary containment for the wastes and the outer shell provides secondary containment in the form of an annulus. The annulus of a DST is equipped with a pump pit, leak detection probes, and other accessories. The existing annulus pumps in the DSTs need to be revamped with a new system to reduce operating costs and reduce the time to deploy a pumping system. The new pumping system will minimize the likelihood of a release of waste into the environment; improve capability of waste removal to the maximum extent possible to comply with Washington Administrative Code (WAC) 173-303-640 and Code of Federal Regulations (CFR) 40 CFR 265.193. This study addresses the time required to deploy an annulus pumping system designed to fit any DST after detection of a leak in the inner shell of the DST

  12. Airbag deployment-related eye injuries.

    Science.gov (United States)

    Koisaari, Tapio; Leivo, Tiina; Sahraravand, Ahmad; Haavisto, Anna-Kaisa; Sulander, Pekka; Tervo, Timo M T

    2017-07-04

    We studied the correlation between airbag deployment and eye injuries using 2 different data sets. The registry of the Finnish Road Accident (FRA) Investigation Teams was analyzed to study severe head- and eyewear-related injuries. All fatal passenger car or van accidents that occurred during the years 2009-2012 (4 years) were included (n = 734). Cases in which the driver's front airbag was deployed were subjected to analysis (n = 409). To determine the proportion of minor, potentially airbag-related eye injuries, the results were compared to the data for all new eye injury patients (n = 1,151) recorded at the Emergency Clinic of the Helsinki University Eye Hospital (HUEH) during one year, from May 1, 2011, to April 30, 2012. In the FRA data set, the unbelted drivers showed a significantly higher risk of death (odds ratio [OR] = 5.89, 95% confidence interval [CI], 3.33-10.9, P = 2.6E-12) or of sustaining head injuries (OR = 2.50, 95% CI, 1.59-3.97, P = 3.8E-5). Only 4 of the 1,151 HUEH patients were involved in a passenger car accident. In one of the crashes, the airbag operated, and the belted driver received 2 sutured eye lid wounds and showed conjunctival sugillation. No permanent eye injuries were recorded during the follow-up. The calculated annual airbag-related eye injury incidence was less than 1/1,000,000 people, 4/100,000 accidents, and 4/10,000 injured occupants. Airbag-related eye injuries occurred very rarely in car accidents in cases where the occupant survived and the restraint system was appropriately used. Spectacle use did not appear to increase the risk of eye injury in restrained occupants.

  13. DEPLOYMENT OF INNOVATIVE CHARACTERIZATION TECHNOLOGIES AND IMPLEMENTATION OF THE MARSSIM PROCESS AT RADIOLOGICALLY CONTAMINATED SITES.

    Energy Technology Data Exchange (ETDEWEB)

    KALB,P.D.; MILIAN,L.; LUCKETT,L.; WATTERS,D.; MILLER,K.M.; GOGOLAK,C.

    2001-05-01

    The success of this Accelerated Site Technology Deployment (ASTD) project is measured on several levels. First, the deployment of this innovative approach using in situ characterization, portable field laboratory measurements, and implementation of MARSSIM was successfully established for all three phases of D and D characterization, i.e., pre-job scoping, on-going disposition of waste, and final status surveys upon completion of the activity. Unlike traditional D and D projects, since the Brookhaven Graphite Research Reactor Decommissioning Project (BGRR-DP) is operating on an accelerated schedule, much of the work is being carried out simultaneously. Rather than complete a full characterization of the facility before D and D work begins, specific removal actions require characterization as the activity progresses. Thus, the need for rapid and cost-effective techniques for characterization is heightened. Secondly, since the approach used for this ASTD project was not thoroughly proven prior to deployment, a large effort was devoted to demonstrating technical comparability to project managers, regulators and stakeholders. During the initial phases, large numbers of replicate samples were taken and analyzed by conventional baseline techniques to ensure that BGRR-DP quality assurance standards were met. ASTD project staff prepared comparisons of data gathered using ISOCS and BetaScint with traditional laboratory methods and presented this information to BGRR-DP staff and regulators from EPA Region II, NYS Department of Environmental Conservation, and the Suffolk County Board of Health. As the results of comparability evaluations became available, approval for these methods was received and the techniques associated with in situ characterization, portable field laboratory measurements, and implementation of MARSSIM were gradually integrated into BGRR-DP procedures.

  14. DEPLOYMENT OF INNOVATIVE CHARACTERIZATION TECHNOLOGIES AND IMPLEMENTATION OF THE MARSSIM PROCESS AT RADIOLOGICALLY CONTAMINATED SITES

    International Nuclear Information System (INIS)

    KALB, P.D.; MILIAN, L.; LUCKETT, L.; WATTERS, D.; MILLER, K.M.; GOGOLAK, C.

    2001-01-01

    The success of this Accelerated Site Technology Deployment (ASTD) project is measured on several levels. First, the deployment of this innovative approach using in situ characterization, portable field laboratory measurements, and implementation of MARSSIM was successfully established for all three phases of D and D characterization, i.e., pre-job scoping, on-going disposition of waste, and final status surveys upon completion of the activity. Unlike traditional D and D projects, since the Brookhaven Graphite Research Reactor Decommissioning Project (BGRR-DP) is operating on an accelerated schedule, much of the work is being carried out simultaneously. Rather than complete a full characterization of the facility before D and D work begins, specific removal actions require characterization as the activity progresses. Thus, the need for rapid and cost-effective techniques for characterization is heightened. Secondly, since the approach used for this ASTD project was not thoroughly proven prior to deployment, a large effort was devoted to demonstrating technical comparability to project managers, regulators and stakeholders. During the initial phases, large numbers of replicate samples were taken and analyzed by conventional baseline techniques to ensure that BGRR-DP quality assurance standards were met. ASTD project staff prepared comparisons of data gathered using ISOCS and BetaScint with traditional laboratory methods and presented this information to BGRR-DP staff and regulators from EPA Region II, NYS Department of Environmental Conservation, and the Suffolk County Board of Health. As the results of comparability evaluations became available, approval for these methods was received and the techniques associated with in situ characterization, portable field laboratory measurements, and implementation of MARSSIM were gradually integrated into BGRR-DP procedures

  15. The financial impact of deployments on reserve health care providers.

    Science.gov (United States)

    Petinaux, Bruno

    2008-08-01

    This study retrospectively surveyed the financial impact of deployments on 17 U.S. Army Reserve health care providers. Due to multiple mobilizations, 29 separate deployments were reported. The deployments, mostly between 2001 and 2005, typically lasted 3 months during which 86% reported no civilian income and 76% reported no civilian benefits. Solo practice providers reported the greatest financial losses due to continuing financial responsibility related to their civilian practice despite being deployed. Overall, 2 deployments did not change, 9 increased, and 16 decreased the medical officer's income. Two were not reported. In this small retrospective convenience sample study, solo practice U.S. Army Reserve health care providers were found to be at highest risk of financial losses during military deployments. This being said, no price can be put on the privilege of serving our men and women in uniform.

  16. Early identification of posttraumatic stress following military deployment

    DEFF Research Database (Denmark)

    Karstoft, Karen-Inge; Statnikov, Alexander; Andersen, Søren B

    2015-01-01

    BACKGROUND: Pre-deployment identification of soldiers at risk for long-term posttraumatic stress psychopathology after home coming is important to guide decisions about deployment. Early post-deployment identification can direct early interventions to those in need and thereby prevents...... the development of chronic psychopathology. Both hold significant public health benefits given large numbers of deployed soldiers, but has so far not been achieved. Here, we aim to assess the potential for pre- and early post-deployment prediction of resilience or posttraumatic stress development in soldiers...... by application of machine learning (ML) methods. METHODS: ML feature selection and prediction algorithms were applied to a prospective cohort of 561 Danish soldiers deployed to Afghanistan in 2009 to identify unique risk indicators and forecast long-term posttraumatic stress responses. RESULTS: Robust pre...

  17. Accounting for variation in wind deployment between Canadian provinces

    International Nuclear Information System (INIS)

    Ferguson-Martin, Christopher J.; Hill, Stephen D.

    2011-01-01

    Wind energy deployment varies widely across regions and this variation cannot be explained by differences in natural wind resources alone. Evidence suggests that institutional factors beyond physical wind resources can influence the deployment of wind energy systems. Building on the work of , this study takes a historical institutionalist approach to examine the main factors influencing wind energy deployment across four Canadian provinces Canada: Alberta, Manitoba, Ontario and Nova Scotia. Our case studies suggest that wind energy deployment depends upon a combination of indirect causal factors-landscape values, political and social movements, government electricity policy, provincial electricity market structure and incumbent generation technologies and direct causal factors-grid architecture, ownership patterns, renewable incentive programs, planning and approvals processes and stakeholder support and opposition. - Research highlights: → Examines the reasons for variations in wind deployment between Canadian provinces. → Employs a historical institutional approach to the analysis. → Discusses social factors that affect wind deployment across Canadian jurisdictions.

  18. Autonomous Deployment and Restoration of Sensor Network using Mobile Robots

    Directory of Open Access Journals (Sweden)

    Tsuyoshi Suzuki

    2010-09-01

    Full Text Available This paper describes an autonomous deployment and restoration of a Wireless Sensor Network (WSN using mobile robots. The authors have been developing an information-gathering system using mobile robots and WSNs in underground spaces in post-disaster environments. In our system, mobile robots carry wireless sensor nodes (SN and deploy them into the environment while measuring Received Signal Strength Indication (RSSI values to ensure communication, thereby enabling the WSN to be deployed and restored autonomously. If the WSN is disrupted, mobile robots restore the communication route by deploying additional or alternate SNs to suitable positions. Utilizing the proposed method, a mobile robot can deploy a WSN and gather environmental information via the WSN. Experimental results using a verification system equipped with a SN deployment and retrieval mechanism are presented.

  19. Autonomous Deployment and Restoration of Sensor Network using Mobile Robots

    Directory of Open Access Journals (Sweden)

    Tsuyoshi Suzuki

    2010-06-01

    Full Text Available This paper describes an autonomous deployment and restoration of a Wireless Sensor Network (WSN using mobile robots. The authors have been developing an information-gathering system using mobile robots and WSNs in underground spaces in post-disaster environments. In our system, mobile robots carry wireless sensor nodes (SN and deploy them into the environment while measuring Received Signal Strength Indication (RSSI values to ensure communication, thereby enabling the WSN to be deployed and restored autonomously. If the WSN is disrupted, mobile robots restore the communication route by deploying additional or alternate SNs to suitable positions. Utilizing the proposed method, a mobile robot can deploy a WSN and gather environmental information via the WSN. Experimental results using a verification system equipped with a SN deployment and retrieval mechanism are presented.

  20. Supporting Military Families with Young Children throughout the Deployment Lifecycle

    Science.gov (United States)

    2016-10-01

    Group, Family Advocacy, Child and Family Behavioral Health, Soldier Readiness Program (SRP), Family Life Chaplain Training Center, Fort Hood Housing ...resilience and child well-being, Soldier and non-deploying parents must successfully meet the challenges of caregiving throughout the deployment cycle ...reintegration program to reduce parenting stress and promote family resilience in Active Duty military families through all phases of the deployment cycle

  1. Self managing monitoring for highly elastic large scale Cloud deployments

    OpenAIRE

    Ward, Jonathan Stuart; Barker, Adam David

    2014-01-01

    Infrastructure as a Service computing exhibits a number of properties, which are not found in conventional server deployments. Elasticity is among the most significant of these properties which has wide reaching implications for applications deployed in cloud hosted VMs. Among the applications affected by elasticity is monitoring. In this paper we investigate the challenges of monitoring large cloud deployments and how these challenges differ from previous monitoring problems. In order to mee...

  2. Molten salt reactors and possible scenarios for future nuclear power deployment

    International Nuclear Information System (INIS)

    Merle-Lucotte, E.; Mathieu, L.; Heuer, D.; Loiseaux, J. M.; Billebaud, A.; Brissot, R.; David, S.; Garzenne, C.; Laulan, O.; Le Brun, C.; Lecarpentier, D.; Liatard, E.; Meplan, O.; Michel-Sendis, F.; Nuttin, A.; Perdu, F.

    2004-01-01

    An important fraction of the nature energy demand may be satisfied by nuclear power. In this context, the possibilities of worldwide nuclear deployment are studied. We are convinced that the Molten Salt Reactors may play a central role in this deployment. The Molten Salt Reactor needs to be coupled to a reprocessing unit in order to extract the Fission Products which poison the core. The efficiency of this reprocessing has a crucial influence on reactor behavior especially for the breeding ratio. The Molten Salt Breeder Reactor project was based on an intensive reprocessing for high breeding purposes. A new concept of Thorium Molten Salt Reactor is presented here. Including this new concept in the worldwide nuclear deployment, to satisfy these power needs, we consider three typical scenarios, based on three reactor types: Pressurized Water Reactor, Fast Neutron Reactor and Thorium Molten Salt Reactor. The aim of this paper is to demonstrate, in a first hand that a Thorium Molten Salt Reactor can be realistic, with correct temperature coefficients and at least iso-breeder with slow reprocessing and new geometry; on the other hand that such Molten Salt Reactors enable a successful nuclear deployment, while minimizing fuel and waste management problems. (authors)

  3. Testing Starshade Manufacturing and Deployment Through NASA's Technology Development for Exoplanet Missions Program

    Science.gov (United States)

    Kasdin, N. J.; Shaklan, S.; Lisman, D.; Thomson, M.; Cady, E.; Lo, A.; Macintosh, B.

    2014-01-01

    An external occulter is a satellite employing a large screen, or starshade, that flies in formation with a spaceborne telescope to provide the starlight suppression needed for detecting and characterizing exoplanets. Among the advantages of using an occulter are the broadband allowed for characterization and the removal of light before entering the observatory, greatly relaxing the requirements on the telescope and instrument. In this poster we report on the results of our two Technology Development for Exoplanet Missions (TDEM) studies. In the first we examined the manufacturability and metrology of starshade petals, successfully constructing a full size petal from flight like materials and showing through precise edge shape measurements that an occulter made with petals consistent with the measured accuracy would achieve close to 10^-10 contrast. Our second TDEM tested the deployment precision of a roughly half-scale starshade. We demonstrated the deployment of an existing deployable truss outfitted with four sub-scale petals and a custom designed central hub. We showed that the system can be deployed multiple times with a repeatable positioning accuracy of the petals better than the requirement of 1.0 mm. The combined results of these two TDEM projects has significantly advanced the readiness level of occulter technology and moved the community closer to a realizable mission.

  4. Solar Photovoltaic Financing: Deployment on Public Property by State and Local Governments

    Energy Technology Data Exchange (ETDEWEB)

    Cory, K.; Coughlin, J.; Coggeshall, C.

    2008-05-01

    State and local governments have grown increasingly aware of the economic, environmental, and societal benefits of taking a lead role in U.S. implementation of renewable energy, particularly distributed photovoltaic (PV) installations. Recently, solar energy's cost premium has declined as a result of technology improvements and an increase in the cost of traditional energy generation. At the same time, a nationwide public policy focus on carbon-free, renewable energy has created a wide range of financial incentives to lower the costs of deploying PV even further. These changes have led to exponential increases in the availability of capital for solar projects, and tremendous creativity in the development of third-party ownership structures. As significant users of electricity, state and local governments can be an excellent example for solar PV system deployment on a national scale. Many public entities are not only considering deployment on public building rooftops, but also large-scale applications on available public lands. The changing marketplace requires that state and local governments be financially sophisticated to capture as much of the economic potential of a PV system as possible. This report examines ways that state and local governments can optimize the financial structure of deploying solar PV for public uses.

  5. HMSRP Hawaiian Monk Seal Telemetry Tag Deployments

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — This project investigates foraging behavior of Hawaiian monk seals by conducting telemetry studies. During these studies, live seals are instrumented with dive...

  6. Deployable Thermoelectric Metamaterial Energy Harvesting Monitoring System

    Data.gov (United States)

    National Aeronautics and Space Administration — This project will combine a novel asynchronous monitoring system with the first-of-its-kind thermoelectric metamaterial.  The thermoelectric prototype is constructed...

  7. Multiobjective Shape Optimization for Deployment and Adjustment Properties of Cable-Net of Deployable Antenna

    Directory of Open Access Journals (Sweden)

    Guoqiang You

    2015-01-01

    Full Text Available Based on structural features of cable-net of deployable antenna, a multiobjective shape optimization method is proposed to help to engineer antenna’s cable-net structure that has better deployment and adjustment properties. In this method, the multiobjective optimum mathematical model is built with lower nodes’ locations of cable-net as variables, the average stress ratio of cable elements and strain energy as objectives, and surface precision and natural frequency of cable-net as constraints. Sequential quadratic programming method is used to solve this nonlinear mathematical model in conditions with different weighting coefficients, and the results show the validity and effectiveness of the proposed method and model.

  8. Market and Policy Barriers to Energy Storage Deployment

    Energy Technology Data Exchange (ETDEWEB)

    Bhatnagar, Dhruv [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Currier, Aileen [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Hernandez, Jacquelynne [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Ma, Ookie [Dept. of Energy (DOE), Washington DC (United States) Office of Energy Efficiency and Renewable Energy; Kirby, Brendan [Consultant

    2013-09-01

    Electric energy storage technologies can provide numerous grid services; there are a number of factors that restrict their current deployment. The most significant barrier to deployment is high capital costs, though several recent deployments indicate that capital costs are decreasing and energy storage may be the preferred economic alternative in certain situations. However, a number of other market and regulatory barriers persist, limiting further deployment. These barriers can be categorized into regulatory barriers, market (economic) barriers, utility and developer business model barriers, cross-cutting barriers and technology barriers.

  9. LWR Spent Fuel Management for the Smooth Deployment of FBR

    International Nuclear Information System (INIS)

    Fukasawa, T.; Yamashita, J.; Hoshino, K.; Sasahira, A.; Inoue, T.; Minato, K.; Sato, S.

    2015-01-01

    Fast breeder reactors (FBR) and FBR fuel cycle are indispensable to prevent the global warming and to secure the long-term energy supply. Commercial FBR expects to be deployed from around 2050 until around 2110 in Japan by the replacement of light water reactors (LWR) after their 60 years life. The FBR deployment needs Pu (MOX) from the LWR-spent fuel (SF) reprocessing. As Japan can posses little excess Pu, its balance control is necessary between LWR-SF management (reprocessing) and FBR deployment. The fuel cycle systems were investigated for the smooth FBR deployment and the effectiveness of proposed flexible system was clarified in this work. (author)

  10. Human Metabolism and Interactions of Deployment-Related Chemicals

    National Research Council Canada - National Science Library

    Hodgson, Ernest

    2003-01-01

    This study examines the human-metabolism and metabolic interactions of a subset of deployment-related chemicals, including chlorpyrifos, DEET, permethrin, pyridostigmine bromide, and sulfur mustard metabolites...

  11. Deployment Testing of the De-Orbit Sail Flight Hardware

    OpenAIRE

    Hillebrandt, Martin; Meyer, Sebastian; Zander, Martin; Hühne, Christian

    2015-01-01

    The paper describes the results of the deployment testing of the De-Orbit Sail flight hardware, a drag sail for de-orbiting applications, performed by DLR. It addresses in particular the deployment tests of the fullscale sail subsystem and deployment force tests performed on the boom deployment module. For the fullscale sail testing a gravity compensation device is used which is described in detail. It allows observations of the in-plane interaction of the booms with the sail membrane and the...

  12. Six policy actions for accelerated deployment of renewable energy. READy Renewable Energy Action on Deployment. Summary

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2012-03-15

    The READy book presents a kaleidoscope of policy options that have proven to accelerate the deployment of renewable energy technologies, based on experiences around the world at the local and national levels. Lessons learned from successful cases are distilled into six essential action points. Together these categories of policy actions compose the ACTION Star, a guide for taking action now while preparing for growth over the long term.

  13. The Deployment Life Study: Longitudinal Analysis of Military Families Across the Deployment Cycle

    Science.gov (United States)

    2016-01-01

    deployment. The 11 events, grouped by type of trauma, are as follows: • combat – engaging in hand-to-hand combat – being physically knocked over...leaving home; missing classes at school because you don’t like your school; missing after-school activities (such as school activities, sports ) because...you don’t feel like participating; missing after-school activities (such as school activi- ties, sports ) because of transportation problems/issues

  14. Swarm Deployable Boom Assembly (DBA) Development of a Deployable Magnetometer Boom for the Swarm Spacecraft

    Science.gov (United States)

    McMahon, Paul; Jung, Hans-Juergen; Edwards, Jeff

    2013-09-01

    The Swarm programme consists of 3 magnetically clean satellites flying in close formation designed to measure the Earth's magnetic field using 2 Magnetometers mounted on a 4.3m long deployable boom.Deployment is initiated by releasing 3 HDRMs, once released the boom oscillates back and forth on a pair of pivots, similar to a restaurant kitchen door hinge, for around 120 seconds before coming to rest on 3 kinematic mounts which are used to provide an accurate reference location in the deployed position. Motion of the boom is damped through a combination of friction, spring hysteresis and flexing of the 120+ cables crossing the hinge. Considerable development work and accurate numerical modelling of the hinge motion was required to predict performance across a wide temperature range and ensure that during the 1st overshoot the boom did not damage itself, the harness or the spacecraft.Due to the magnetic cleanliness requirements of the spacecraft no magnetic materials could be used in the design of the hardware.

  15. Technology Deployment Annual Report 2014 December

    Energy Technology Data Exchange (ETDEWEB)

    Arterburn, George K. [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2014-12-01

    This report is a summary of key Technology Deployment activities and achievements for 2014, including intellectual property, granted copyrights, royalties, license agreements, CRADAs, WFOs and Technology-Based Economic Development. Idaho National Laboratory (INL) is a Department of Energy (DOE) multi-program national laboratory that conducts research and development in all DOE mission areas. Like all other federal laboratories, INL has a statutory, technology transfer mission to make its capabilities and technologies available to all federal agencies, to state and local governments, and to universities and industry. To fulfill this mission, INL encourages its scientific, engineering, and technical staff to disclose new inventions and creations to ensure the resulting intellectual property is captured, protected, and made available to others who might benefit from it. As part of the mission, intellectual property is licensed to industrial partners for commercialization, creating jobs and delivering the benefits of federally funded technology to consumers. In other cases, unique capabilities are made available to other federal agencies or to regional small businesses to solve specific technical challenges. INL employees also work cooperatively with researchers and technical staff from the university and industrial sectors to further develop emerging technologies. In our multinational global economy, INL is contributing to the development of the next generation of engineers and scientists by licensing software to educational instiutitons throughout the world. This report is a catalog of selected INL technology transfer and commercialization transactions during this past year. The size and diversity of INL technical resources, coupled with the large number of relationships with other organizations, virtually ensures that a report of this nature will fail to capture all interactions. Recognizing this limitation, this report focuses on transactions that are specifically

  16. Tunable bandgaps in a deployable metamaterial

    Science.gov (United States)

    Nanda, Aditya; Karami, M. A.

    2018-06-01

    In this manuscript, we investigate deployable structures (such as solar arrays) and origami-inspired foldable structures as metamaterials capable of tunable wave manipulation. Specifically, we present a metamaterial whose bandgaps can be modulated by changing the fold angle of adjacent panels. The repeating unit cell of the structure consists of a beam (representing a panel) and a torsional spring (representing the folding mechanism). Two important cases are considered. Firstly, the fold angle (angle between adjacent beams), Ψ, is zero and only flexural waves propagate. In the second case, the fold angle is greater than zero (Ψ > 0). This causes longitudinal and transverse vibration to be coupled. FEM models are used to validate both these analyses. Increasing the fold angle was found to inflict notable changes to the wave transmission characteristics of the structure. In general, increasing the fold angles caused the bandwidth of bandgaps to increase. For the lowest four bandgaps we found bandwidth increases of 252 %, 177 %, 230 % and 163 % respectively at Ψ = 90 deg (relative to the bandwidths at Ψ = 0). In addition, non-trivial increases in bandwidth of the odd-numbered bandgaps occurs even at small fold angles-the bandwidth for the first and third bandgaps effectively double in size (increase by 100 %) at Ψ = 20 deg relative to those at Ψ = 0. This could have ramifications in the context of tunable wave manipulation and adaptive filtering. In addition, by expanding out the characteristic equation of transfer matrix for the straight structure, we prove that the upper band edge of the nth bandgap will always equal the nth simply supported natural frequency of the constituent beam. Further, we found that the ratio (EI/kt) is a pertinent parameter affecting the bandwidth of bandgaps. For low values of the ratio, effectively, no bandgap exists. For higher values of the ratio (EI/kt), we obtain a relatively large bandgap over which no waves propagate. This can

  17. Open Compute Project at CERN

    CERN Multimedia

    CERN. Geneva

    2014-01-01

    The Open Compute Project, OCP ( http://www.opencompute.org/), was launched by Facebook in 2011 with the objective of building efficient computing infrastructures at lowest possible cost. The technologies are released as open hardware design, with the goal to develop servers and data centers following the model traditionally associated with open source software projects. We have been following the OCP project for some time and decided to buy two OCP twin servers in 2013 to get some hands-on experience. The servers have been tested and compared with our standard hardware regularly acquired through large tenders. In this presentation we will give some relevant results from this testing and also discuss some of the more important differences that can matter for a larger deployment at CERN. Finally it will outline the details for a possible project for a larger deployment of OCP hardware for production use at CERN.

  18. Testing and Deployment of Software Systems (in practice)

    DEFF Research Database (Denmark)

    Nyborg, Mads; Høgh, Stig

    2014-01-01

    . The aim of this paper is to describe: • the unified software development process and compare this with CDIO. • the activities covering the ‘O’ part in software engineering. • the course structure and schedule. • the evaluations and comments received from students. The paper concludes that: It is possible......The CDIO concept is now well integrated into many curricula at universities around the world and it has meant an increase in the quality of engineering education. However, the main focus has been on design-build projects and less on the ‘C’ and ‘O’ part. In particular, the ‘O’ part of CDIO has...... received very little focus, since this is probably the most difficult part to implement in a university environment. Because of this observation, in 2011 we decided to launch a new elective course, ‘Testing and deployment of software systems (in practice)’, focusing entirely on the ‘O’ part in CDIO...

  19. Quality Control, Testing, and Deployment Results in the NIF ICCS

    International Nuclear Information System (INIS)

    Woodruff, J P; Casavant, D; Cline, B D; Gorvad, M R

    2001-01-01

    The strategy used to develop the NIF Integrated Computer Control System (ICCS) calls for incremental cycles of construction and formal test to deliver a total of 1 million lines of code. Each incremental release takes four to six months to implement specific functionality and culminates when offline tests conducted in the ICCS Integration and Test Facility verify functional, performance, and interface requirements. Tests are then repeated on line to confirm integrated operation in dedicated laser laboratories or ultimately in the NIF. Test incidents along with other change requests are recorded and tracked to closure by the software change control board (SCCB). Annual independent audits advise management on software process improvements. Extensive experience has been gained by integrating controls in the prototype laser preamplifier laboratory. The control system installed in the preamplifier lab contains five of the ten planned supervisory subsystems and seven of sixteen planned front-end processors (FEPs). Beam alignment, timing, diagnosis and laser pulse amplification up to 20 joules was tested through an automated series of shots. Other laboratories have provided integrated testing of six additional FEPs. Process measurements including earned-value, product size, and defect densities provide software project controls and generate confidence that the control system will be successfully deployed

  20. Renewable Energy Deployment as Climate Change Mitigation in Nigeria

    Directory of Open Access Journals (Sweden)

    Olotu Yahaya

    2016-10-01

    Full Text Available The scientific evidence of climate change as a result of greenhouse gas emissions which causes ozone layer depletion is becoming increasingly obvious and clear. Findings revealed that energy from the fossil fuel is the major source of greenhouse emission which destroys the environment and makes it unhealthy for living beings. In Nigeria, conventional energy (oil and gas with gas flaring has the highest percentage of 52% and liquid fuel of 32% of carbon dioxide (CO2 respectively. This sector contributes revenue of over 70% to Nigeria’s economy and generates an average total 21.8% of greenhouse gas emission. In Nigeria, there is a much more potential for share renewables with 15.4% of total energy production and 8.6 % of energy consumption. In reality with global environmental concern, Nigeria’s carbon dioxide emissions have increased with energy production and consumption. The Integrated Renewable Energy Master Plan of 2008 projects a 26.7% renewable energy contribution to the Nigeria’s energy use and this is expected to reduce CO2 and greenhouse gas emissions at 38% by2025. Nigeria has not been playing significant role by reducing emissions of greenhouse gases. This paper highlights Nigeria’s climate change situation and penetration requirements for various renewable energy deployments as mitigating instrument for climate change towards healthy and productive environment.

  1. Mechanical deployment system on aries an autonomous mobile robot

    International Nuclear Information System (INIS)

    Rocheleau, D.N.

    1995-01-01

    ARIES (Autonomous Robotic Inspection Experimental System) is under development for the Department of Energy (DOE) to survey and inspect drums containing low-level radioactive waste stored in warehouses at DOE facilities. This paper focuses on the mechanical deployment system-referred to as the camera positioning system (CPS)-used in the project. The CPS is used for positioning four identical but separate camera packages consisting of vision cameras and other required sensors such as bar-code readers and light stripe projectors. The CPS is attached to the top of a mobile robot and consists of two mechanisms. The first is a lift mechanism composed of 5 interlocking rail-elements which starts from a retracted position and extends upward to simultaneously position 3 separate camera packages to inspect the top three drums of a column of four drums. The second is a parallelogram special case Grashof four-bar mechanism which is used for positioning a camera package on drums on the floor. Both mechanisms are the subject of this paper, where the lift mechanism is discussed in detail

  2. Deploying Renewables -- principles for effective policies

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2008-09-29

    Renewable energy can play a fundamental role in tackling climate change, environmental degradation and energy security. As these challenges have become ever more pressing, governments and markets are seeking innovative solutions. Yet, what are the key factors that will determine the success of renewable energy policies? How can current policies be improved to encourage greater deployment of renewables? What impact can more effective policies have on renewables' share in the future global energy mix and how soon? This publication addresses these questions. Responding to the Gleneagles G8 call for a clean and secure energy future, it highlights key policy tools to fast-track renewables into the mainstream. This analysis illustrates good practices by applying the combined metrics of effectiveness and efficiency to renewable energy policies in the electricity, heating and transport sectors. It highlights significant barriers to accelerating renewables penetration, and argues that the great potential of renewables can be exploited much more rapidly and to a much larger extent if good practices are adopted. Carefully designed policy frameworks, customised to support technologies at differing stages of maturity, will deliver a strong portfolio of renewable energy technologies. The document provides recommendations on key principles for policy design as a template for decision makers.

  3. Automating NEURON Simulation Deployment in Cloud Resources.

    Science.gov (United States)

    Stockton, David B; Santamaria, Fidel

    2017-01-01

    Simulations in neuroscience are performed on local servers or High Performance Computing (HPC) facilities. Recently, cloud computing has emerged as a potential computational platform for neuroscience simulation. In this paper we compare and contrast HPC and cloud resources for scientific computation, then report how we deployed NEURON, a widely used simulator of neuronal activity, in three clouds: Chameleon Cloud, a hybrid private academic cloud for cloud technology research based on the OpenStack software; Rackspace, a public commercial cloud, also based on OpenStack; and Amazon Elastic Cloud Computing, based on Amazon's proprietary software. We describe the manual procedures and how to automate cloud operations. We describe extending our simulation automation software called NeuroManager (Stockton and Santamaria, Frontiers in Neuroinformatics, 2015), so that the user is capable of recruiting private cloud, public cloud, HPC, and local servers simultaneously with a simple common interface. We conclude by performing several studies in which we examine speedup, efficiency, total session time, and cost for sets of simulations of a published NEURON model.

  4. Deployable structures using bistable reeled composites

    Science.gov (United States)

    Daton-Lovett, Andrew J.; Compton-Bishop, Quentin M.; Curry, Richard G.

    2000-06-01

    This paper describes an innovative, patented use of composite materials developed by RolaTube Technology Ltd. to make smart deployable structures. Bi-stable reeled composites (BRCs) can alternate between two stable forms; that of a strong, rigid structure and that of a compact coil of flat-wound material. Bi-stability arises as a result of the manipulation of Poisson's ratio and isotropy in the various layers of the material. BRCs are made of fiber- reinforced composite materials, most often with a thermoplastic matrix. A range of fibers and polymer matrices can be used according to the requirements of the operating environment. Samples of a BRC structure were constructed using layers of unidirectional, fiber-reinforced thermoplastic sheet with the layers at different angles. The whole assembly was then consolidated under conditions of elevated temperature and pressure. The properties of the BRC are described and the result of a series of experiments performed on the sample to determine the tensile strength of the BRC structure are reported. A full analysis using finite element methods is being undertaken in collaboration with the University of Cambridge, England. The first commercial use has been to fabricate boom and drive mechanisms for the remote inspection of industrial plant.

  5. New technologies deployment for advanced power plants

    International Nuclear Information System (INIS)

    Kiyoshi, Yamauchi

    2007-01-01

    Mitsubishi Heavy Industries, Ltd. (MHI) has been the total engineering and manufacturing company of pressurized water reactors (PWRs) in Japan since the commencement of commercial operations of Mihama Unit 1 of the Kansai Electric Power Company in 1970. Over these decades, MHI has endeavored to develop a broad spread of nuclear technology, from design, manufacturing, and construction, to plant maintenance services. More recently, with the ever rising need for nuclear power generation around the world to prevent global warming and to cope with surging oil prices, MHI is striving to expand its nuclear power business in the world market, such as US-APWR (Advanced Pressurized Water Reactor) in the U.S., as well as to develop technology for advanced reactors and nuclear fuel cycles to ensure energy security in the future. This paper introduces these approaches, especially focused on new technologies deployment for the global needs, and clarifies the current status and future prospects of MHI as the world's leading nuclear company. (author)

  6. Deploying the advanced U.S. EPR

    International Nuclear Information System (INIS)

    Hagan, C.

    2007-01-01

    As electricity demand, clean air concerns and energy prices increase in the U.S., interest in new nuclear reactors is also on the rise. These factors - along with decades of outstanding performance of the nation's existing nuclear fleet - have contributed to a favorable market for new nuclear power in the U.S. Although no U.S. company has declared it actually will buy and build new reactors, many have actively expressed their interest through investment and regulatory interaction. The timing is also right for new reactors in terms of public perception, government policy and acceptance of the investment community. Amid this environment, the U.S. commercial power industry recently has begun pursuing new nuclear generation in earnest. AREVA, whose ongoing global market analyses indicated the need for additional baseload nuclear generation in the U.S., chose to license its EPR design to meet that need. This article will discuss the American market landscape for new nuclear and how AREVA is approaching it, present an overview of the company's U.S. EPR technology, and provide an update on the regulatory status of the design and deployment schedule. (orig.)

  7. Quality function deployment in launch operations

    Science.gov (United States)

    Portanova, P. L.; Tomei, E. J., Jr.

    1990-11-01

    The goal of the Advanced Launch System (ALS) is a more efficient launch capability that provides a highly reliable and operable system at substantially lower cost than current launch systems. Total Quality Management (TQM) principles are being emphasized throughout the ALS program. A continuous improvement philosophy is directed toward satisfying users' and customer's requirements in terms of quality, performance, schedule, and cost. Quality Function Deployment (QFD) is interpreted as the voice of the customer (or user), and it is an important planning tool in translating these requirements throughout the whole process of design, development, manufacture, and operations. This report explores the application of QFD methodology to launch operations, including the modification and addition of events (operations planning) in the engineering development cycle, and presents an informal status of study results to date. QFD is a technique for systematically analyzing the customer's (Space Command) perceptions of what constitutes a highly reliable and operable system and functionally breaking down those attributes to identify the critical characteristics that determine an efficient launch system capability. In applying the principle of QFD, a series of matrices or charts are developed with emphasis on the one commonly known as the House of Quality (because of its roof-like format), which identifies and translates the most critical information.

  8. Daddy's Days Away. A Deployment Activity Book for Parents & Children.

    Science.gov (United States)

    Marine Corps, Washington, DC.

    This booklet grew from an idea that the children of Marines might appreciate some special discussion of their family's separation during deployment. Information is provided for parents to help them express their feelings with their children about the deployment. Outlines of activities to do before leaving are included. Suggestions are given for…

  9. Hitting the ground running: Healthgrid deployment and adoption

    NARCIS (Netherlands)

    Gwadry-Sridhar, Femida; Olabarriaga, Silvia D.; van Kampen, Antoine; Bauer, Michael; Solomonides, Tony

    2010-01-01

    We consider the issues of healthgrid development, deployment and adoption in health care and research environments. While healthgrid technology could be deployed to support advanced medical research, we are not seeing its wide adoption. Understanding why this technology is not being exploited is one

  10. Accommodating Thickness in Origami-Based Deployable Arrays

    Science.gov (United States)

    Zirbel, Shannon A.; Magleby, Spencer P.; Howell, Larry L.; Lang, Robert J.; Thomson, Mark W.; Sigel, Deborah A.; Walkemeyer, Phillip E.; Trease, Brian P.

    2013-01-01

    The purpose of this work is to create deployment systems with a large ratio of stowed-to-deployed diameter. Deployment from a compact form to a final flat state can be achieved through origami-inspired folding of panels. There are many models capable of this motion when folded in a material with negligible thickness; however, when the application requires the folding of thick, rigid panels, attention must be paid to the effect of material thickness not only on the final folded state, but also during the folding motion (i.e., the panels must not be required to flex to attain the final folded form). The objective is to develop new methods for deployment from a compact folded form to a large circular array (or other final form). This paper describes a mathematical model for modifying the pattern to accommodate material thickness in the context of the design, modeling, and testing of a deployable system inspired by an origami six-sided flasher model. The model is demonstrated in hardware as a 1/20th scale prototype of a deployable solar array for space applications. The resulting prototype has a ratio of stowed-to-deployed diameter of 9.2 (or 1.25 m deployed outer diameter to 0.136 m stowed outer diameter).

  11. Post-deployment usability evaluation of a radiology workstation

    NARCIS (Netherlands)

    Jorritsma, Wiard; Cnossen, Fokie; Dierckx, Rudi; Oudkerk, Matthijs; van Ooijen, Peter

    2015-01-01

    Objective To evaluate the usability of a radiology workstation after deployment in a hospital. Significance In radiology, it is difficult to perform valid pre-deployment usability evaluations due to the heterogeneity of the user group, the complexity of the radiological workflow, and the complexity

  12. How Have Deployments During the War on Terrorism Affected Reenlistment?

    Science.gov (United States)

    2009-01-01

    Ethiopia, certain areas of Greece, Haiti, Indonesia, Iran, Iraq, Israel, Jordan, Kenya, Kosovo, Kuwait, Kyrgyzstan, Lebanon, Liberia, Malaysia ...deployment is a direct source of utility, as modeled in Chapter Three. Deployment is not simply another form of “work” that takes time away from “ leisure

  13. 50 CFR 635.21 - Gear operation and deployment restrictions.

    Science.gov (United States)

    2010-10-01

    ... 50 Wildlife and Fisheries 8 2010-10-01 2010-10-01 false Gear operation and deployment restrictions....21 Gear operation and deployment restrictions. Link to an amendment published at 75 FR 57701, Sept. 22, 2010. The green-stick gear authorization requirements under paragraphs (c)(2)(v)(A), (c)(2)(v)(B...

  14. The WPU Project

    DEFF Research Database (Denmark)

    Jensen, Janne Jul; Skov, Mikael B.; Stage, Jan

    2008-01-01

    in the course of the project, when there is neither time nor financial possibilities for solving the problems. The objective of the WPU project is to develop new methods for usability engineering in the development of web portals and to test these methods in companies that develop modern web portals. The result......The Web Portal Usability (WPU) project focuses on usability in the development of modern web portals. Web portals are a key part of software development. They are created to provide a group of users with access to a collection of internet services. State-of-the-art methods for usability engineering...... is a catalogue of methods that support usability engineering in web portal development, combined with guidelines for use, training programmes and documented experience from deployment and use of the methods. The WPU project is a collaborative effort between researchers from Aalborg University, Department...

  15. Field Deployable Gamma Radiation Detectors for DHS Use

    Energy Technology Data Exchange (ETDEWEB)

    Sanjoy Mukhopadhyay

    2007-08-01

    Recently, the Department of Homeland Security (DHS) has integrated all nuclear detection research, development, testing, evaluation, acquisition, and operational support into a single office: the Domestic Nuclear Detection Office (DNDO). The DNDO has specific requirements set for all commercial off-the-shelf and government off-the-shelf radiation detection equipment and data acquisition systems. This article would investigate several recent developments in field deployable gamma radiation detectors that are attempting to meet the DNDO specifications. Commercially available, transportable, handheld radio isotope identification devices (RIID) are inadequate for DHS requirements in terms of sensitivity, resolution, response time, and reach-back capability. The leading commercial vendor manufacturing handheld gamma spectrometer in the United States is Thermo Electron Corporation. Thermo Electron's identiFINDER{trademark}, which primarily uses sodium iodide crystals (3.18 x 2.54cm cylinders) as gamma detectors, has a Full-Width-at-Half-Maximum energy resolution of 7 percent at 662 keV. Thermo Electron has just recently come up with a reach-back capability patented as RadReachBack{trademark} that enables emergency personnel to obtain real-time technical analysis of radiation samples they find in the field. The current project has the goal to build a prototype handheld gamma spectrometer, equipped with a digital camera and an embedded cell phone to be used as an RIID with higher sensitivity, better resolution, and faster response time (able to detect the presence of gamma-emitting radio isotopes within 5 seconds of approach), which will make it useful as a field deployable tool. The handheld equipment continuously monitors the ambient gamma radiation, and, if it comes across any radiation anomalies with higher than normal gamma gross counts, it sets an alarm condition. When a substantial alarm level is reached, the system automatically triggers the saving of relevant

  16. Field Deployable Gamma Radiation Detectors for DHS Use

    International Nuclear Information System (INIS)

    Sanjoy Mukhopadhyay

    2007-01-01

    Recently, the Department of Homeland Security (DHS) has integrated all nuclear detection research, development, testing, evaluation, acquisition, and operational support into a single office: the Domestic Nuclear Detection Office (DNDO). The DNDO has specific requirements set for all commercial off-the-shelf and government off-the-shelf radiation detection equipment and data acquisition systems. This article would investigate several recent developments in field deployable gamma radiation detectors that are attempting to meet the DNDO specifications. Commercially available, transportable, handheld radio isotope identification devices (RIID) are inadequate for DHS requirements in terms of sensitivity, resolution, response time, and reach-back capability. The leading commercial vendor manufacturing handheld gamma spectrometer in the United States is Thermo Electron Corporation. Thermo Electron's identiFINDER(trademark), which primarily uses sodium iodide crystals (3.18 x 2.54cm cylinders) as gamma detectors, has a Full-Width-at-Half-Maximum energy resolution of 7 percent at 662 keV. Thermo Electron has just recently come up with a reach-back capability patented as RadReachBack(trademark) that enables emergency personnel to obtain real-time technical analysis of radiation samples they find in the field. The current project has the goal to build a prototype handheld gamma spectrometer, equipped with a digital camera and an embedded cell phone to be used as an RIID with higher sensitivity, better resolution, and faster response time (able to detect the presence of gamma-emitting radio isotopes within 5 seconds of approach), which will make it useful as a field deployable tool. The handheld equipment continuously monitors the ambient gamma radiation, and, if it comes across any radiation anomalies with higher than normal gamma gross counts, it sets an alarm condition. When a substantial alarm level is reached, the system automatically triggers the saving of relevant

  17. Review of deployment technology for tethered satellite systems

    Science.gov (United States)

    Yu, B. S.; Wen, H.; Jin, D. P.

    2018-03-01

    Tethered satellite systems (TSSs) have attracted significant attention due to their potential and valuable applications for scientific research. With the development of various launched on-orbit missions, the deployment of tethers is considered a crucial technology for operation of a TSS. Both past orbiting experiments and numerical results have shown that oscillations of the deployed tether due to the Coriolis force and environmental perturbations are inevitable and that the impact between the space tether and end-body at the end of the deployment process leads to complicated nonlinear phenomena. Hence, a set of suitable control methods plays a fundamental role in tether deployment. This review article summarizes previous work on aspects of the dynamics, control, and ground-based experiments of tether deployment. The relevant basic principles, analytical expressions, simulation cases, and experimental results are presented as well.

  18. Clinical Predictive Modeling Development and Deployment through FHIR Web Services.

    Science.gov (United States)

    Khalilia, Mohammed; Choi, Myung; Henderson, Amelia; Iyengar, Sneha; Braunstein, Mark; Sun, Jimeng

    2015-01-01

    Clinical predictive modeling involves two challenging tasks: model development and model deployment. In this paper we demonstrate a software architecture for developing and deploying clinical predictive models using web services via the Health Level 7 (HL7) Fast Healthcare Interoperability Resources (FHIR) standard. The services enable model development using electronic health records (EHRs) stored in OMOP CDM databases and model deployment for scoring individual patients through FHIR resources. The MIMIC2 ICU dataset and a synthetic outpatient dataset were transformed into OMOP CDM databases for predictive model development. The resulting predictive models are deployed as FHIR resources, which receive requests of patient information, perform prediction against the deployed predictive model and respond with prediction scores. To assess the practicality of this approach we evaluated the response and prediction time of the FHIR modeling web services. We found the system to be reasonably fast with one second total response time per patient prediction.

  19. Military deployment and reintegration: a systematic review of child coping.

    Science.gov (United States)

    Bello-Utu, Cindy F; DeSocio, Janiece E

    2015-02-01

    Child coping with parent military deployment and family reintegration. A systematic review of research literature was conducted to examine the effects of deployment and family reintegration on children in military families. A search of CINAHL, PubMed, Psyc-INFO, and SocINDEX databases was performed using the terms "military family," "military child," "child coping," "deployment," and "reintegration." The search was limited to publications between 2001 and 2014 to focus on the effects of Operation Enduring Freedom (OEF), Operation Iraqi Freedom (OIF), and Operation New Dawn (OND). Twenty-seven research reports met inclusion criteria. Three themes were extracted: A child's coping is influenced by (a) the child's age and development, (b) the mental health and coping of the non-deployed parent during deployment, and the mental health of both parents during family reintegration, and (c) the pre-existing resilience/vulnerability, cumulative risks, and resources of the child and family. © 2015 Wiley Periodicals, Inc.

  20. Shape memory alloy fracture as a deployment actuator

    International Nuclear Information System (INIS)

    Buban, Darrick M; Frantziskonis, George N

    2013-01-01

    The paper reports an experimental investigation into using shape memory alloy (SMA) as a deployment actuator. SMA specimens were heated and pulled to failure or pulled and heated to failure, thus developing an environmental and structural operating envelope for application as deployment mechanisms. The experimental results strongly suggest that SMAs can be implemented as deployment actuators. Recorded data shows that SMA fracture is possible over a wide range of temperatures and strains, filling a material performance gap not found in the literature. The obtained information allows design engineers to appropriately size SMAs given the design requirements for achieving the desired deployment effects. The major conclusion of the reported work is that SMAs as actuators are strong competitors to typical existing deployment efforts that use explosive or non-explosive actuators having implementation drawbacks such as the expense associated with special handling and the volume encountered in mounting the devices. (paper)

  1. Design of the De-Orbit Sail Boom Deployment Unit

    Science.gov (United States)

    Meyer, Sebastian; Hillebrandt, Martin; Straubel, Marco; Huhne, Christian

    2014-06-01

    The design of the De-Orbit Sail boom deployment unit is strongly driven by volume constraints, which are given by the cubesat container. Four CFRP (carbon fiber reinforced polymer) booms [4] with a cross-sectional shape of a double-omega and a length of 3.6 m are reeled on one spool in the center of the unit. The deployment of the four booms are controlled by an electric motor, which acts on the boom spool. Due to the volume limitation caused by the dimensions of the cubesat deployer the deployment unit has little room for the mechanisms components. With the aim to achieve a robust design, the deployment concept of the unit has greatly changed during the development process. The history of the design as well as the mechanisms are described. Additionally the results of the flight model testing are presented.

  2. Impact of Federal Tax Policy on Utility-Scale Solar Deployment Given Financing Interactions

    Energy Technology Data Exchange (ETDEWEB)

    Mai, Trieu; Cole, Wesley; Krishnan, Venkat; Bolinger, Mark

    2015-09-28

    In this study, the authors conducted a literature review of approaches and assumptions used by other modeling teams and consultants with respect to solar project financing; developed and incorporated an ability to model the likely financing shift away from more expensive sources of capital and toward cheaper sources as the investment tax credit declines in the ReEDS model; and used the 'before and after' versions of the ReEDS model to isolate and analyze the deployment impact of the financing shift under a range of conditions. Using ReEDS scenarios with this improved capability, we find that this 'financing' shift would soften the blow of the ITC reversion; however, the overall impacts of such a shift in capital structure are estimated to be small and near-term utility-scale PV deployment is found to be much more sensitive to other factors that might drive down utility-scale PV prices.

  3. A report on FY06 IPv6 deployment activities and issues at Sandia National Laboratories.

    Energy Technology Data Exchange (ETDEWEB)

    Tolendino, Lawrence F.; Eldridge, John M.; Hu, Tan Chang

    2006-06-01

    Internet Protocol version 4 (IPv4) has been a mainstay of the both the Internet and corporate networks for delivering network packets to the desired destination. However, rapid proliferation of network appliances, evolution of corporate networks, and the expanding Internet has begun to stress the limitations of the protocol. Internet Protocol version 6 (IPv6) is the replacement protocol that overcomes the constraints of IPv4. IPv6 deployment in government network backbones has been mandated to occur by 2008. This paper explores the readiness of the Sandia National Laboratories' network backbone to support IPv6, the issues that must be addressed before a deployment begins, and recommends the next steps to take to comply with government mandates. The paper describes a joint, work effort of the Sandia National Laboratories ASC WAN project team and members of the System Analysis & Trouble Resolution and Network System Design & Implementation Departments.

  4. State Support for Clean Energy Deployment. Lessons Learned for Potential Future Policy

    Energy Technology Data Exchange (ETDEWEB)

    Kubert, Charles [Clean Energy States Alliance, Montpelier, VT (United States); Sinclair, Mark [Clean Energy States Alliance, Montpelier, VT (United States)

    2011-04-01

    Proposed federal clean energy initiatives and climate legislation have suggested significant increases to federal funding for clean energy deployment and investment. Many states and utilities have over a decade of experience and spend billions of public dollars every year to support EE/RE deployment through programs that reduce the cost of technologies, provide financing for EE/RE projects, offer technical assistance, and educate market participants. Meanwhile, constraints on public expenditures at all levels of government continue to call upon such programs to demonstrate their value. This report reviews the results of these programs and the specific financial incentives and financing tools used to encourage clean energy investment. Lessons from such programs could be used to inform the future application of EE/RE incentives and financing tools. These lessons learned apply to use of distributed resources and the historical focus of these EE/RE programs.

  5. State Support for Clean Energy Deployment: Lessons Learned for Potential Future Policy

    Energy Technology Data Exchange (ETDEWEB)

    Kubert, C.; Sinclair, M.

    2011-04-01

    Proposed federal clean energy initiatives and climate legislation have suggested significant increases to federal funding for clean energy deployment and investment. Many states and utilities have over a decade of experience and spend billions of public dollars every year to support EE/RE deployment through programs that reduce the cost of technologies, provide financing for EE/RE projects, offer technical assistance, and educate market participants. Meanwhile, constraints on public expenditures at all levels of government continue to call upon such programs to demonstrate their value. This report reviews the results of these programs and the specific financial incentives and financing tools used to encourage clean energy investment. Lessons from such programs could be used to inform the future application of EE/RE incentives and financing tools. These lessons learned apply to use of distributed resources and the historical focus of these EE/RE programs.

  6. Discursive Deployments: Mobilizing Support for Municipal and Community Wireless Networks in the U.S.

    Energy Technology Data Exchange (ETDEWEB)

    Alvarez, Rosio; Rodriguez, Juana Maria

    2008-08-16

    This paper examines Municipal Wireless (MW) deployments in the United States. In particular, the interest is in understanding how discourse has worked to mobilize widespread support for MW networks. We explore how local governments discursively deploy the language of social movements to create a shared understanding of the networking needs of communities. Through the process of"framing" local governments assign meaning to the MW networks in ways intended to mobilize support anddemobilize opposition. The mobilizing potential of a frame varies and is dependent on its centrality and cultural resonance. We examine the framing efforts of MW networks by using a sample of Request for Proposals for community wireless networks, semi-structured interviews and local media sources. Prominent values that are central to a majority of the projects and others that are culturally specific are identified and analyzed for their mobilizing potency.

  7. An innovative deployable solar panel system for Cubesats

    Science.gov (United States)

    Santoni, Fabio; Piergentili, Fabrizio; Donati, Serena; Perelli, Massimo; Negri, Andrea; Marino, Michele

    2014-02-01

    One of the main Cubesat bus limitations is the available on-board power. The maximum power obtained using body mounted solar panels and advanced triple junction solar cells on a triple unit Cubesat is typically less than 10 W. The Cubesat performance and the mission scenario opened to these small satellite systems could be greatly enhanced by an increase of the available power. This paper describes the design and realization of a modular deployable solar panel system for Cubesats, consisting of a modular hinge and spring system that can be potentially used on-board single (1U), double(2U), triple (3U) and six units (6U) Cubesats. The size of each solar panels is the size of a lateral Cubesat surface. The system developed is the basis for a SADA (Solar Array Drive Assembly), in which a maneuvering capability is added to the deployed solar array in order to follow the apparent motion of the sun. The system design trade-off is discussed, comparing different deployment concepts and architectures, leading to the final selection for the modular design. A prototype of the system has been realized for a 3U Cubesat, consisting of two deployable solar panel systems, made of three solar panels each, for a total of six deployed solar panels. The deployment system is based on a plastic fiber wire and thermal cutters, guaranteeing a suitable level of reliability. A test-bed for the solar panel deployment testing has been developed, supporting the solar array during deployment reproducing the dynamical situation in orbit. The results of the deployment system testing are discussed, including the design and realization of the test-bed, the mechanical stress given to the solar cells by the deployment accelerations and the overall system performance. The maximum power delivered by the system is about 50.4 W BOL, greatly enhancing the present Cubesat solar array performance.

  8. Perceived effect of deployment on families of UK military personnel.

    Science.gov (United States)

    Thandi, G; Greenberg, N; Fear, N T; Jones, N

    2017-10-01

    In the UK, little is known about the perceived effects of deployment, on military families, from military personnel in theatre. To investigate military personnel's perceptions of the impact of deployment on intimate relationships and children. Deployed service personnel who were in a relationship, and who had children, completed a survey while deployed on combat operations. Data were taken from four mental health surveys carried out in Iraq in 2009 and Afghanistan in 2010, 2011 and 2014. Among 4265 participants, after adjusting for military and social-demographic covariates, perceiving that deployment had a negative impact on intimate relationships and children was associated with psychological distress, and traumatic stress symptoms. Military personnel who reported being in danger of being injured or killed during deployment, were more likely to report a perceived negative effect of deployment on their intimate relationships. Reservists were less likely to report a perceived negative impact of deployment on their children compared with regulars. Military personnel who themselves planned to separate from their partner were more likely to report psychological distress, and stressors at home. Perceived insufficient support from the Ministry of Defence was associated with poor mental health, and holding a junior rank. Deployed UK military personnel with symptoms of psychological distress, who experienced stressors at home, were especially likely to perceive that their family were inadequately supported by the military. Those planning to separate from their partner were at increased risk of suffering with mental health problems while deployed. © The Author 2017. Published by Oxford University Press on behalf of the Society of Occupational Medicine. All rights reserved. For Permissions, please email: journals.permissions@oup.com

  9. Technology Deployment Annual Report 2013 December

    Energy Technology Data Exchange (ETDEWEB)

    N/A

    2014-01-01

    available to the INL’s Office of Technology Deployment. However, the accomplishments cataloged in the report reflect the achievements and creativity of the researchers, technicians, support staff, and operators of the INL workforce.

  10. Nuclear power project management information system

    International Nuclear Information System (INIS)

    Zou Lailong; Zhang Peng; Xiao Ziyan; Chun Zengjun; Huang Futong

    2001-01-01

    Project Management Information System is an important infrastructure facility for the construction and operation of Nuclear Power Station. Based on the practice of Lingao nuclear power project management information system (NPMIS), the author describes the NPMIS design goals, system architecture and software functionality, points out the outline issues during the development and deployment of NPMIS

  11. Deployment of community health workers across rural sub-Saharan Africa: financial considerations and operational assumptions.

    Science.gov (United States)

    McCord, Gordon C; Liu, Anne; Singh, Prabhjot

    2013-04-01

    To provide cost guidance for developing a locally adaptable and nationally scalable community health worker (CHW) system within primary-health-care systems in sub-Saharan Africa. The yearly costs of training, equipping and deploying CHWs throughout rural sub-Saharan Africa were calculated using data from the literature and from the Millennium Villages Project. Model assumptions were such as to allow national governments to adapt the CHW subsystem to national needs and to deploy an average of 1 CHW per 650 rural inhabitants by 2015. The CHW subsystem described was costed by employing geographic information system (GIS) data on population, urban extents, national and subnational disease prevalence, and unit costs (from the field for wages and commodities). The model is easily replicable and configurable. Countries can adapt it to local prices, wages, population density and disease burdens in different geographic areas. The average annual cost of deploying CHWs to service the entire sub-Saharan African rural population by 2015 would be approximately 2.6 billion (i.e. 2600 million) United States dollars (US$). This sum, to be covered both by national governments and by donor partners, translates into US$ 6.86 per year per inhabitant covered by the CHW subsystem and into US$ 2.72 per year per inhabitant. Alternatively, it would take an annual average of US$ 3750 to train, equip and support each CHW. Comprehensive CHW subsystems can be deployed across sub-Saharan Africa at cost that is modest compared with the projected costs of the primary-health-care system. Given their documented successes, they offer a strong complement to facility-based care in rural African settings.

  12. Nuclear Reactor Technology Assessment for Near Term Deployment

    International Nuclear Information System (INIS)

    2013-01-01

    of the best technology to meet the objectives of the nuclear power programme. Documenting and defending the basis for this RTA decision making requires and deserves technical approaches that are developed on the basis of best practices. In the infrastructure development programme to support nuclear power in newcomer Member States, several major tasks interface directly with RTA . The initial stage of the RTA programme requires principal objectives to be defined by the policy development decision makers. The programme then develops and delivers the core technical evaluations for the project feasibility study, the bid invitation, the bid evaluation and contracting, and the reactor deployment phases. The same approach may also be applied for Member States seeking to expand their nuclear energy programme. This report demonstrates how RTA is performed and how the process and results of this work enable decision making for nuclear power planning and implementation for each of the above tasks. The approach provides decision makers with the documentation necessary to support their conclusions. Further, the preparation for and application of the RTA approach and process creates an additional vehicle for capacity building in Member States through IAEA technology training.

  13. IEA Wind Task 23, offshore wind technology and deployment. Subtask 1: Experience with critical deployment issues. Final technical report

    Energy Technology Data Exchange (ETDEWEB)

    Lemming, J

    2010-10-15

    The final report for IEA Wind Task 23, Offshore Wind Energy Technology and Deployment, is made up of two separate reports: Subtask 1: Experience with Critical Deployment Issues and Subtask 2: Offshore Code Comparison Collaborative (OC3). The Subtask 1 report included here provides background information and objectives of Task 23. It specifically discusses ecological issues and regulation, electrical system integration and offshore wind, external conditions, and key conclusions for Subtask 1. A comprehensive approach to planning is needed that integrates impacts on ecology, the effects of electrical infrastructure, and the layout of wind farms. Governments, which usually finance ecological research, should disclose results for wide dissemination as they become available. As example the workshop held suggested that documents covering the issues like offshore wind energy legislation, Guidelines for EIAs and SEAs and best practices need to be produced and distributed on a regular basis, as ecological research progresses and experience from the planning and operation of existing wind farms emerges. Research should help strike the balance between optimum regulation and the need to get projects up and running. Such research is needed to increase understanding of offshore wind metrology and its impact on electrical power fluctuations. More work is needed to develop special grid code and standards for offshore. The transient behavior of large cable installations (switching / harmonic/ Behavior and modeling of large HV cable systems) must be better understood. Connection and control systems must be developed for large offshore wind farms. Work is needed to develop the technical architecture of offshore wind grid systems. Public access to measurements (e.g., turbine power output, meteorological masts, buoys) is important, especially for model validation. Determining wake effects is currently the most important challenge in wind engineering. Emphasis should be put into

  14. Deployment of commercial energy efficiency cooking

    International Nuclear Information System (INIS)

    1999-04-01

    This research concerned the promotion of energy-efficient wood stoves in commercial and institutional kitchens in Ethiopia, Kenya, Tanzania and Uganda through technology transfer and training of local commercial stove producers. The key objective of the project was to introduce proven designs of energy-efficient wood stoves to producers in the target countries and train them in the manufacture and marketing of these stoves. The improved designs save 50% of the fuel used by the traditional stoves - a major saving where 10-15% of the kitchen budget is spent on fuel. They also remove smoke more effectively, protect cooks from heat and burns, and are easier to keep clean. The project went well although results have varied from one country to the other. In conclusion, the technology transfer of commercial stove designs can take place between neighbouring countries by a process of training, study visits, prototype development, market surveys and producer support.(author)

  15. Architectural mismatch issues in identity management deployment

    DEFF Research Database (Denmark)

    Andersen, Mads Schaarup

    2010-01-01

    Integrating Commercial Off-The-Shelf products in a company's software product portfolio offers business value, but introduces challenges from a software architecture perspective. In this paper, the research challenges in relation to identity management in the Danish municipality administration...... system called Opus, are outlined. Opus BRS is the identity management part of Opus. Opus integrates SAP, legacy mainframe systems, and other third party systems of the individual municipality. Each of these systems define their own software architecture and access control model, leading to architectural...... mismatch with an impact on security, usability, and maintainability. The research project is discussed and access control and identity provisioning are recognized as the major areas of interest in relation to the mismatch challenges. The project is carried out in close cooperation with KMD, one...

  16. Evaluation of Representative Smart Grid Investment Grant Project Technologies: Distributed Generation

    Energy Technology Data Exchange (ETDEWEB)

    Singh, Ruchi; Vyakaranam, Bharat GNVSR

    2012-02-14

    This document is one of a series of reports estimating the benefits of deploying technologies similar to those implemented on the Smart Grid Investment Grant (SGIG) projects. Four technical reports cover the various types of technologies deployed in the SGIG projects, distribution automation, demand response, energy storage, and renewables integration. A fifth report in the series examines the benefits of deploying these technologies on a national level. This technical report examines the impacts of addition of renewable resources- solar and wind in the distribution system as deployed in the SGIG projects.

  17. Domain Name Server Security (DNSSEC) Protocol Deployment

    Science.gov (United States)

    2014-10-01

    Platform How IPv6 and DNSSEC Change the Intranets OARC Workshop San Francisco, March 2011 Materials available at: https://indico.dns-oarc.net...DNSSEC In Operation NIC .sn The Mensa project - Measuring DNS Health and Security How IPv6 and DNSSEC change the Intranets DNSSEC Update for DE...Technical Concerns Raised by the DNS Filtering Requirements in the PROTECT IP Bill Global IPv6 Summit, Taipei, Taiwan, November 2011 TWCERT/CC

  18. Home front: post-deployment mental health and divorces.

    Science.gov (United States)

    Negrusa, Brighita; Negrusa, Sebastian

    2014-06-01

    Since 2003, about 14 % of U.S. Army soldiers have reported symptoms of posttraumatic stress disorder (PTSD) following deployments. In this article, we examine how post-deployment symptoms of PTSD and of other mental health conditions are related to the probability of divorce among married active-duty U.S. Army soldiers. For this purpose, we combine Army administrative individual-level longitudinal data on soldiers' deployments, marital history, and sociodemographic characteristics with their self-reported post-deployment health information. Our estimates indicate that time spent in deployment increases the divorce risk among Army enlisted personnel and that PTSD symptoms are associated with further increases in the odds of divorce. Although officers are generally less likely to screen positive for PTSD than enlisted personnel, we find a stronger relationship between PTSD symptoms and divorces among Army officers who are PTSD-symptomatic than among enlisted personnel. We estimate a larger impact of deployments on the divorce risk among female soldiers, but we do not find a differential impact of PTSD symptoms by gender. Also, we find that most of the effect of PTSD symptoms occurs early in the career of soldiers who deploy multiple times.

  19. Photovoltaic deployment strategy in Japan and the USA-an institutional appraisal

    International Nuclear Information System (INIS)

    Shum, Kwok L.; Watanabe, Chihiro

    2007-01-01

    PV as an information technology-like technology focusing upon user oriented customization to achieve deployment. Different models have different implications to the system engineering aspect of solar PV. A focus upon the standard grid-connected distributed category in the residential setting avoids the heavy customized engineering associated with many off-grid and one-off type projects. Japanese PV deployment strategy of concentrating upon a dominant category or niche with mass market potential also well matches the institutional structure of production [Coase, 1991. The Institutional Structure of Production, in Essays on Economics and Economists. The University of Chicago Press, Chicago] within the local PV technology suppliers industry. Major vertical integrated firms can facilitate system-related learning easier than a fragmented industry within the PV value chain with minimal transaction cost. This highly suggests that deployment strategy of PV or other renewable energy technologies must address the issues of adopting a globally developed technology to local (national) conditions and has strong institutional underpinnings in addition to financial subsidies, learning investment thinking

  20. Pneumothorax, without chest wall fracture, following airbag deployment

    Directory of Open Access Journals (Sweden)

    Samuel Parsons

    2010-12-01

    Full Text Available Air bags are an automatic crash protection system. They have been shown to reduce mortality from motor vehicle accidents by 31% following direct head-on impacts, by 19% following any frontal impact and by 11% overall. Despite obvious benefits there has been a corresponding increase in the number of injuries resulting from their deployment. We describe a case of a pneumothorax in the absence of chest wall pathology associated with airbag deployment, in a belted driver. There has been one previous description of pneumothorax associated with airbag deployment, in an unbelted driver.

  1. Novel Tools in Determining the Physiological Demands and Nutritional Practices of Ontario FireRangers during Fire Deployments.

    Directory of Open Access Journals (Sweden)

    A H Robertson

    Full Text Available The seasonal profession of wildland fire fighting in Canada requires individuals to work in harsh environmental conditions that are physically demanding. The purpose of this study was to use novel technologies to evaluate the physiological demands and nutritional practices of Canadian FireRangers during fire deployments.Participants (n = 21 from a northern Ontario Fire Base volunteered for this study and data collection occurred during the 2014 fire season and included Initial Attack (IA, Project Fire (P, and Fire Base (B deployments. Deployment-specific energy demands and physiological responses were measured using heart-rate variability (HRV monitoring devices (Zephyr BioHarness3 units. Food consumption behaviour and nutrient quantity and quality were captured using audio-video food logs on iPod Touches and analyzed by NutriBase Pro 11 software.Insufficient kilocalories were consumed relative to expenditure for all deployment types. Average daily kilocalories consumed: IA: 3758 (80% consumption rate; P: 2945±888.8; B: 2433±570.8. Average daily kilocalorie expenditure: IA: 4538±106.3; P: 4012±1164.8; B: 2842±649.9. The Average Macronutrient Distribution Range (AMDR for protein was acceptable: 22-25% (across deployment types. Whereas the AMDR for fat and carbohydrates were high: 40-50%; and low: 27-37% respectively, across deployment types.This study is the first to use the described methodology to simultaneously evaluate energy expenditures and nutritional practices in an occupational setting. The results support the use of HRV monitoring and video-food capture, in occupational field settings, to assess job demands. FireRangers expended the most energy during IA, and the least during B deployments. These results indicate the need to develop strategies centered on maintaining physical fitness and improving food practices.

  2. Using quality function deployment to capture the voice of the customer and translate it into the voice of the provider.

    Science.gov (United States)

    Chaplin, E; Bailey, M; Crosby, R; Gorman, D; Holland, X; Hippe, C; Hoff, T; Nawrocki, D; Pichette, S; Thota, N

    1999-06-01

    Health care has a number of historical barriers to capturing the voice of the customer and to incorporating customer wants into health care services, whether the customer is a patient, an insurer, or a community. Quality function deployment (QFD) is a set of tools and practices that can help overcome these barriers to form a process for the planning and design or redesign of products and services. The goal of the project was to increase referral volume and to improve a rehabilitation hospital's capacity to provide comprehensive medical and/or legal evaluations for people with complex and catastrophic injuries or illnesses. HIGH-LEVEL VIEW OF QFD AS A PROCESS: The steps in QFD are as follows: capture of the voice of the customer, quality deployment, functions deployment, failure mode deployment, new process deployment, and task deployment. The output of each step becomes the input to a matrix tool or table of the next step of the process. In 3 1/2 months a nine-person project team at Continental Rehabilitation Hospital (San Diego) used QFD tools to capture the voice of the customer, use these data as the basis for a questionnaire on important qualities of service from the customer's perspective, obtain competitive data on how the organization was perceived to be meeting the demanded qualities, identify measurable dimensions and targets of these qualities, and incorporate the functions and tasks into the delivery of service which are necessary to meet the demanded qualities. The future of providing health care services will belong to organizations that can adapt to a rapidly changing environment and to demands for new products and services that are produced and delivered in new ways.

  3. Deploy production sliding mesh capability with linear solver benchmarking.

    Energy Technology Data Exchange (ETDEWEB)

    Domino, Stefan P. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Thomas, Stephen [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Barone, Matthew F. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Williams, Alan B. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Ananthan, Shreyas [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Knaus, Robert C. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Overfelt, James [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Sprague, Mike [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Rood, Jon [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2018-02-01

    Wind applications require the ability to simulate rotating blades. To support this use-case, a novel design-order sliding mesh algorithm has been developed and deployed. The hybrid method combines the control volume finite element methodology (CVFEM) with concepts found within a discontinuous Galerkin (DG) finite element method (FEM) to manage a sliding mesh. The method has been demonstrated to be design-order for the tested polynomial basis (P=1 and P=2) and has been deployed to provide production simulation capability for a Vestas V27 (225 kW) wind turbine. Other stationary and canonical rotating ow simulations are also presented. As the majority of wind-energy applications are driving extensive usage of hybrid meshes, a foundational study that outlines near-wall numerical behavior for a variety of element topologies is presented. Results indicate that the proposed nonlinear stabilization operator (NSO) is an effective stabilization methodology to control Gibbs phenomena at large cell Peclet numbers. The study also provides practical mesh resolution guidelines for future analysis efforts. Application-driven performance and algorithmic improvements have been carried out to increase robustness of the scheme on hybrid production wind energy meshes. Specifically, the Kokkos-based Nalu Kernel construct outlined in the FY17/Q4 ExaWind milestone has been transitioned to the hybrid mesh regime. This code base is exercised within a full V27 production run. Simulation timings for parallel search and custom ghosting are presented. As the low-Mach application space requires implicit matrix solves, the cost of matrix reinitialization has been evaluated on a variety of production meshes. Results indicate that at low element counts, i.e., fewer than 100 million elements, matrix graph initialization and preconditioner setup times are small. However, as mesh sizes increase, e.g., 500 million elements, simulation time associated with \\setup-up" costs can increase to nearly 50% of

  4. ICT Solutions to Support EV Deployment

    DEFF Research Database (Denmark)

    Pedersen, Anders Bro; Andersen, Peter Bach; Skov Johansen, Joachim

    2013-01-01

    Numerous studies and projects have proven that the electric vehicle can offer value and services that go beyond its function as a means of transportation. The value and services can, for instance, be the reduction of charging costs, adherence to grid constraints, or adjustment of charging behavior...... utilization concepts for EVs and be harmonized to obtain interoperability among numerous electric vehicle (EV) and electric vehicle supply equipment from original equipment manufacturers. This chapter describes contemporary Smart Grid communication methods in terms of requirements and specific solutions...

  5. Physical trajectory profile data from glider ru31 deployed by Rutgers, the State University of New Jersey in the Gulf of Mexico from 2016-01-13 to 2016-02-12 (NCEI Accession 0145722)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Glider deployed as part of the CONsortium for oil spill exposure pathways in COastal River-Dominated Ecosystems (CONCORDE). The goal of the project is to use a...

  6. Physical trajectory profile data from glider ru31 deployed by Rutgers, the State University of New Jersey in the Gulf of Mexico from 2015-10-28 to 2015-11-01 (NCEI Accession 0153548)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Glider deployed as part of the CONsortium for oil spill exposure pathways in COastal River-Dominated Ecosystems (CONCORDE). The goal of the project is to use a...

  7. Deployment of energy efficient technologies in developing countries

    International Nuclear Information System (INIS)

    Koch, H.J.

    2000-01-01

    Efficient and reliable power generation and power distribution represent the engine for economic growth in developing countries. A vast majority of the population in these countries does not have access to electricity, and those that do are often faced with an unreliable power distribution system. Now is the ideal time to transfer efficient energy technologies which also adhere to environmental standards. There are a myriad of inexpensive ways to avoid energy losses, such as cogeneration, the addition of natural gas turbines to coal-fired heating boilers. Even power generation itself can be more efficient. These improvements would encourage the financing world to pay closer attention and invest more rapidly in projects aimed at improving efficient power generation. The International Energy Agency was created in 1974 with the participation of 25 countries, and its mandate was expanded to include the deployment of clean and efficient energy technologies in developing countries. Technology transfer involves more than the shipping of equipment combined with some expert assistance. It involves the active participation of several partners, from the private sector, governments, non-governmental organizations (NGO), and academic institutions. The objective is to empower the recipient population, thereby reducing the need for imports. It is a joint international effort where the results benefit all participants. The author also discussed the Climate Technology Initiative (CTI) with the aim of disseminating information concerning climate change in the hope of reducing global emissions of greenhouse gases. Discussions to assist countries in the examination of avenues open to them in the field of energy are also fostered. Training in energy efficient technologies represents an important aspect of the role of CTI. It applies to decision makers to help them establish appropriate guidelines and regulations with regard to these technologies. Sustainable development can be achieved

  8. Interoperability after deployment: persistent challenges and regional strategies in Denmark.

    Science.gov (United States)

    Kierkegaard, Patrick

    2015-04-01

    The European Union has identified Denmark as one of the countries who have the potential to provide leadership and inspiration for other countries in eHealth implementation and adoption. However, Denmark has historically struggled to facilitate data exchange between their public hospitals' electronic health records (EHRs). Furthermore, state-led projects failed to adequately address the challenges of interoperability after deployment. Changes in the organizational setup and division of responsibilities concerning the future of eHealth implementations in hospitals took place, which granted the Danish regions the full responsibility for all hospital systems, specifically the consolidation of EHRs to one system per region. The regions reduced the number of different EHRs to six systems by 2014. Additionally, the first version of the National Health Record was launched to provide health care practitioners with an overview of a patient's data stored in all EHRs across the regions and within the various health sectors. The governance of national eHealth implementation plays a crucial role in the development and diffusion of interoperable technologies. Changes in the organizational setup and redistribution of responsibilities between the Danish regions and the state play a pivotal role in producing viable and coherent solutions in a timely manner. Interoperability initiatives are best managed on a regional level or by the authorities responsible for the provision of local health care services. Cross-regional communication is essential during the initial phases of planning in order to set a common goal for countrywide harmonization, coherence and collaboration. © The Author 2015. Published by Oxford University Press in association with the International Society for Quality in Health Care; all rights reserved.

  9. All projects related to | Page 101 | IDRC - International Development ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    Financial Services and the Deployment of Agricultural Innovations in the Sahel. Project. Over the past 20 years, numerous innovations to improve food crop yields have ... Areas Network Phase III: Devolution to the American University of Beirut.

  10. All projects related to canada | Page 14 | IDRC - International ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    Zambia is experiencing a crisis in terms of the size and deployment of its health workforce. Start Date: January 13, ... Co-management of Natural Resources across Radical Differences : Case Study of the Yshiro (Paraguay). Project. Previous ...

  11. Water Quality Vocabulary Development and Deployment

    Science.gov (United States)

    Simons, B. A.; Yu, J.; Cox, S. J.

    2013-12-01

    Semantic descriptions of observed properties and associated units of measure are fundamental to understanding of environmental observations, including groundwater, surface water and marine water quality. Semantic descriptions can be captured in machine-readable ontologies and vocabularies, thus providing support for the annotation of observation values from the disparate data sources with appropriate and accurate metadata, which is critical for achieving semantic interoperability. However, current stand-alone water quality vocabularies provide limited support for cross-system comparisons or data fusion. To enhance semantic interoperability, the alignment of water-quality properties with definitions of chemical entities and units of measure in existing widely-used vocabularies is required. Modern ontologies and vocabularies are expressed, organized and deployed using Semantic Web technologies. We developed an ontology for observed properties (i.e. a model for expressing appropriate controlled vocabularies) which extends the NASA/TopQuadrant QUDT ontology for Unit and QuantityKind with two additional classes and two properties (see accompanying paper by Cox, Simons and Yu). We use our ontology to populate the Water Quality vocabulary with a set of individuals of each of the four key classes (and their subclasses), and add appropriate relationships between these individuals. This ontology is aligned with other relevant stand-alone Water Quality vocabularies and domain ontologies. Developing the Water Quality vocabulary involved two main steps. First, the Water Quality vocabulary was populated with individuals of the ObservedProperty class, which was determined from a census of existing datasets and services. Each ObservedProperty individual relates to other individuals of Unit and QuantityKind (taken from QUDT where possible), and to IdentifiedObject individuals. As a large fraction of observed water quality data are classified by the chemical substance involved, the

  12. University of Tennessee deploys force10 switch for CERN work

    CERN Multimedia

    2007-01-01

    "Force20 networks, the pioneer in building and securing reliable networks, today announced that the University of Tennessee physics department has deployed the C300 resilient switch to analyze data form CERN's Large Hadron Collider." (1/2 page)

  13. New Analysis and Theory of Deployable Folded Structures, Phase I

    Data.gov (United States)

    National Aeronautics and Space Administration — A recently developed mathematical theory has great value for deployable space structures and in situ manufacture of large beams, panels, cylinders and other...

  14. New Analysis and Theory of Deployable Folded Structures, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — A recently developed mathematical folding theory has great value for deployable space structures and in situ manufacture of large beams, panels and cylinders. The...

  15. Costs and benefits of MDOT intelligent transportation system deployments.

    Science.gov (United States)

    2015-07-01

    This report analyses costs and benefits of Intelligent Transportation Systems (ITS) deployed by : the Michigan Department of Transportation (MDOT). MDOT ITS focuses on traffic incident : management and also provide Freeway Courtesy Patrol services. A...

  16. Design and Deployment of Mobile FSO Communication System

    KAUST Repository

    Alheadary, Wael Ghazy

    2017-05-08

    As a potential solution to many applications, we developed a mobile free-space optical (FSO) system that achieves 1Gbps with transmission distance of 70 m. This system needs minimal preparation to be deployed within an hour.

  17. Effects of Deployments on Homestation Job Stress and Burnout

    National Research Council Canada - National Science Library

    Johnson, S. R

    2005-01-01

    .... The increased rate of deployments, coupled with the reduction in resources, has military leaders concerned that these changing demands will cause undue strain, adversely affecting the military member's quality of life...

  18. Morphing structures using soft polymers for active deployment

    International Nuclear Information System (INIS)

    Daynes, Stephen; Grisdale, Amy; Trask, Richard; Seddon, Annela

    2014-01-01

    In this study, we take inspiration from morphing strategies observed in nature, origami design and stiffness tailoring principles in engineering, to develop a thin walled, low cost, bistable cell geometry capable of reversibly unfolding from a flat configuration to a highly textured configuration. Finite element analysis was used to model the cell deployment and capture the experimentally observed bistability of the reinforced silicone elastomer. Through the combination of flexible elastomers with locally reinforced regions enables a highly tailorable and controllable deployment response. These cells are bistable allowing them to maintain their shape when either deployed or retracted without sustained actuation. It is proposed that such deployable cells with reversible surfaces and texture change can be used as a means of adaptive camouflage. (fast track communication)

  19. EOP CRITTERCAM Deployments on French Frigate Shoals monk seals

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — CRITTERCAMs, were deployed on a 42 monk seals at French Frigate Shoals Hawaii. Sixty nine hours of video comprised of 3192 recording segments collected at...

  20. Creating a Comprehensive Solar Water Heating Deployment Strategy

    Energy Technology Data Exchange (ETDEWEB)

    Focus Marketing Services

    1999-08-18

    This report details the results of a research conducted in 1998 and 1999 and outlines a marketing deployment plan designed for businesses interested in marketing solar water heaters in the new home industry.

  1. Creating a Comprehensive Solar Water Heating Deployment Strategy

    International Nuclear Information System (INIS)

    Focus Marketing Services

    1999-01-01

    This report details the results of a research conducted in 1998 and 1999 and outlines a marketing deployment plan designed for businesses interested in marketing solar water heaters in the new home industry

  2. Flexible, Phase Change Fabric for Deployable Decelerators, Phase I

    Data.gov (United States)

    National Aeronautics and Space Administration — SDMA proposes to develop a flexible fabric containing Phase Change Materials that is suitable for use on Deployable Decelerators. This technology will make...

  3. The feasibility of Quality Function Deployment (QFD) as an ...

    African Journals Online (AJOL)

    The feasibility of Quality Function Deployment (QFD) as an assessment and quality ... and facilities that had the most pertinent information on the research focus. ... Keywords: Customer Satisfaction Performance; Graduate School; Quality ...

  4. The American Satellite Company (ASC) satellite deployed from payload bay

    Science.gov (United States)

    1985-01-01

    The American Satellite Company (ASC) communications satellite is deployed from the payload bay of the Shuttle Discovery. A portion of the cloudy surface of the earth can be seen to the left of the frame.

  5. Design and Deployment of Mobile FSO Communication System

    KAUST Repository

    Alheadary, Wael Ghazy; Guo, Yong; Stegenburgs, Edgars; Park, Kihong; Ng, Tien Khee; Ooi, Boon S.; Alouini, Mohamed-Slim

    2017-01-01

    As a potential solution to many applications, we developed a mobile free-space optical (FSO) system that achieves 1Gbps with transmission distance of 70 m. This system needs minimal preparation to be deployed within an hour.

  6. View of the deployed INSAT/PAM-D

    Science.gov (United States)

    1983-01-01

    View of the deployed Indian National Satellite (INSAT) attached to Payload Assist Module (PAM) D drifts above the earth's surface. A faint shadow of the open payload bay can be seen in the top left of the frame.

  7. Connected Vehicle Pilot Deployment Program Phase 2, Data Management Plan

    Science.gov (United States)

    2017-10-17

    This document represents a data management plan that delineates all of the data types and data treatment throughout the New York City Connected Vehicle Pilot Deployment (NYC CVPD). This plan includes an identification of the New York City connected v...

  8. Precision Deployable Mast for the SWOT KaRIn Instrument

    Data.gov (United States)

    National Aeronautics and Space Administration — Design and prototype a lightweight, precision-deployable mast for the Ka-band Radar Interferometer (KaRIn) antennas in the Surface Water and Ocean Topography (SWOT)...

  9. Surface Optimization Techniques for Deployable Reflectors, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — Under this and several other programs, CTD has developed TEMBOREG deployable solid-surface reflectors (TEMBOREG Reflectors) to provide future NASA and Air Force...

  10. Extreme Environment Sampling System Deployment Mechanism, Phase I

    Data.gov (United States)

    National Aeronautics and Space Administration — Future Venus or Comet mission architectures may feature robotic sampling systems comprised of a Sampling Tool and Deployment Mechanism. Since 2005, Honeybee has been...

  11. The Deployment Experience: Organizational Climate and Work Life

    National Research Council Canada - National Science Library

    Wilcove, Gerry L

    2006-01-01

    ...) and shore personnel (n = 5,032). Results for 2005 showed that deployed personnel had significantly more negative attitudes than shore personnel on several indices, including job satisfaction, quality of command leadership, available...

  12. Deploying ICT with Entrepreneurship Culture can Fight Cyber-Crime ...

    African Journals Online (AJOL)

    Deploying ICT with Entrepreneurship Culture can Fight Cyber-Crime Menace ... Again he innovates, introducing new products & technologies by the ... Keywords: Cyber-crimes, entrepreneurs, compupreneur, firewalls, computer forensics, ICT, ...

  13. Lessons learned on solar powered wireless sensor network deployments in urban, desert environments

    KAUST Repository

    Dehwah, Ahmad H.

    2015-05-01

    The successful deployment of a large scale solar powered wireless sensor network in an urban, desert environment is a very complex task. Specific cities of such environments cause a variety of operational problems, ranging from hardware faults to operational challenges, for instance due to the high variability of solar energy availability. Even a seemingly functional sensor network created in the lab does not guarantee reliable long term operation, which is absolutely necessary given the cost and difficulty of accessing sensor nodes in urban environments. As part of a larger traffic flow wireless sensor network project, we conducted several deployments in the last two years to evaluate the long-term performance of solar-powered urban wireless sensor networks in a desert area. In this article, we share our experiences in all domains of sensor network operations, from the conception of hardware to post-deployment analysis, including operational constraints that directly impact the software that can be run. We illustrate these experiences using numerous experimental results, and present multiple unexpected operational problems as well as some possible solutions to address them. We also show that current technology is far from meeting all operational constraints for these demanding applications, in which sensor networks are to operate for years to become economically appealing.

  14. Adaptable Deployable Entry & Placement Technology (ADEPT) for Cubesat Delivery to Mars Surface

    Science.gov (United States)

    Wercinski, Paul

    2014-01-01

    The Adaptable, Deployable Entry and Placement Technology (ADEPT), uses a mechanical skeleton to deploy a revolutionary carbon fabric system that serves as both heat shield and primary structure during atmospheric entry. The NASA ADEPT project, currently funded by the Game Changing Development Program in STMD is currently focused on 1m class hypersonic decelerators for the delivery of very small payloads ( 5 kg) to locations of interest in an effort to leverage low-cost platforms to rapidly mature the technology while simultaneously delivering high-value science. Preliminary mission design and aerothermal performance testing in arcjets have shown the ADEPT system is quite capable of safe delivery of cubesats to Mars surface. The ability of the ADEPT to transit to Mars in a stowed configuration (similar to an umbrella) provides options for integration with the Mars 2020 cruise stage, even to consider multiple ADEPTs. System-level test campaigns are underway for FY15 execution or planning for FY16. These include deployment testing, wind tunnel testing, system-level arc jet testing, and a sounding rocket flight test. The goal is system level maturation (TRL 6) at a 1m class Mars design reference mission configuration.

  15. A strategy analysis of the fast breeder reactor introduction and nuclear fuel cycle systems deployment

    International Nuclear Information System (INIS)

    Wajima, Tsunetaka; Kawashima, Katsuyuki; Yamashita, Takashi

    1996-01-01

    A study is made on a strategy analysis of the long term nuclear fuel cycle systems deployment in accordance with the nuclear power growth projection and fast breeder reactor (FBR) introduction. In the analysis, the reprocessed plutonium (Pu) is charged into the reactor in such a way that the reprocessed Pu is not stored outside the reactor, i.e., there is no excess Pu outside the reactor. The analysis characterized the fuel cycle systems, and showed the usefulness of the present method to determine future directions for the FBR introduction and nuclear fuel cycle systems deployment. Concerning an intermediate-term strategy, the time of introduction and required capacities of a second commercial LWR reprocessing plant, Pu-thermal, and the first FBR reprocessing plant deployment are evaluated. A long term strategy analysis shows that the two or three large plants are run in parallel for each fuel cycle facility and that FBR related facilities deal with a markedly large amount of Pu. It is concluded that the early stage introduction of FBRs of significant capacities seems necessary to materialize a consistent total FBR/fuel cycle system where Pu balance becomes feasible through its flexible operation of, for instance, adjusting breeding ratio, in order to keep the transparency of the Pu utilization. (author)

  16. Deployment of an in-house designed training process in a quaternary care hospital.

    Science.gov (United States)

    Kumar, Ajit; Bhatia, Saurabh; Chiang, I-Jen

    2013-01-01

    Healthcare providers, such as doctors and nurses, have been famous for high resistance to change. A careful change management plan, particularly training process, is utmost necessary. A quaternary care hospital in India changed its system, from manual to Electronic Medical Record/Health Information System (EMR/HIS). The hospital management wanted to train its 4000 diverse end-users on the EMR/HIS in two months' time. This paper describes an in-house designed training process and its deployment in the given healthcare organizational settings. We designed a training process named DRIPDA. The training process was deployed to train 4000 end-users of EMR/HIS, in the quaternary care hospital. Various factors, such as methods and tools of training, constraints of trainees, trainers, and organization were considered while deploying the training process. The effectiveness of the DRIPDA was assessed using the Kirkpatrick model. End-users received training on the new system only in 25% of estimated time and 28% of the projected expense, without having any distraction in their usual workflow, or any productivity loss. We found that the DRIPDA training process could train all employees effectively and efficiently. A decent training process can help in managing the change, thereby reduce the training time and cost.

  17. A report on IPv6 deployment activities and issues at Sandia National Laboratories:FY2007.

    Energy Technology Data Exchange (ETDEWEB)

    Tolendino, Lawrence F.; Eldridge, John M.; Hu, Tan Chang; Maestas, Joseph H.

    2007-06-01

    Internet Protocol version 4 (IPv4) has been a mainstay of the both the Internet and corporate networks for delivering network packets to the desired destination. However, rapid proliferation of network appliances, evolution of corporate networks, and the expanding Internet has begun to stress the limitations of the protocol. Internet Protocol version 6 (IPv6) is the replacement protocol that overcomes the constraints of IPv4. As the emerging Internet network protocol, SNL needs to prepare for its eventual deployment in international, national, customer, and local networks. Additionally, the United States Office of Management and Budget has mandated that IPv6 deployment in government network backbones occurs by 2008. This paper explores the readiness of the Sandia National Laboratories network backbone to support IPv6, the issues that must be addressed before a deployment begins, and recommends the next steps to take to comply with government mandates. The paper describes a joint work effort of the Sandia National Laboratories ASC WAN project team and members of the System Analysis & Trouble Resolution, the Communication & Network Systems, and Network System Design & Implementation Departments.

  18. Link Between Deployment Factors and Parenting Stress in Navy Families

    Science.gov (United States)

    2016-04-11

    5a. CONTRACT NUMBER N/A Families 5b. GRANT NUMBER HT9404-13-1-TS05 5c. PROGRAM ELEMENT NUMBER N/A 6. AUTHOR(S) 5d...Purpose: Many service members today are married, and many also have children; deployments affect all members of the military family . The purpose of this...conducted. Findings: As deployment factors increased, parenting stress increased for fathers in the reintegration period, with a potential mediation

  19. Is Military Deployment a Risk Factor for Maternal Depression?

    Science.gov (United States)

    2013-01-01

    679–684. 39. Quevedo LA, Silva RA, Godoy R, et al. The impact of ma- ternal post - partum depression on the language development of children at 12 months...Naval Health Research Center Is Military Deployment A Risk Factor for Maternal Depression ? Stacie Nguyen Cynthia A. LeardMann Besa Smith...Sylvester Road San Diego, California 92106-3521 Original Articles Is Military Deployment a Risk Factor for Maternal Depression ? Stacie Nguyen, MPH

  20. Deployment Models: Towards Eliminating Security Concerns From Cloud Computing

    OpenAIRE

    Zhao, Gansen; Chunming, Rong; Jaatun, Martin Gilje; Sandnes, Frode Eika

    2010-01-01

    Cloud computing has become a popular choice as an alternative to investing new IT systems. When making decisions on adopting cloud computing related solutions, security has always been a major concern. This article summarizes security concerns in cloud computing and proposes five service deployment models to ease these concerns. The proposed models provide different security related features to address different requirements and scenarios and can serve as reference models for deployment. D...

  1. Supporting Military Families with Young Children throughout the Deployment Lifecycle

    Science.gov (United States)

    2017-10-01

    Traumatic Stress Studies (ISTSS) Conference. Chicago, IL. 2. Kritikos*, T.K. & DeVoe, E.R. Relationship quality of recently deployed military...prevention and family orientation of the study . We continue to have impact on multiple disciplinary areas, including social work, psychology , and public...resilience in Active Duty military families through all phases of the deployment cycle. The study will be conducted in three phases. In phase 1

  2. The effect of deployment frequencies on the military divorce rate

    OpenAIRE

    Arenstein, Stacy J.

    2011-01-01

    Approved for public release; distribution is unlimited. The primary goal of this research is to investigate whether the length and frequency of deployments affect the likelihood of divorce. The study uses data from the Contingency Tracking System (CTS) and the Active Duty Military Personnel file. The sample includes all active duty Navy and Marine Corps members from 2000 to 2009. Three models of divorce are estimated, each with a different control for the stress of deployment on the f...

  3. University of Cambridge deploys Procket Networks' PRO/8801

    CERN Multimedia

    2003-01-01

    Procket Networks, a provider of high performance Internet Protocol (IP) technology and products has announced that the University of Cambridge has deployed the PRO/8801(TM) router into its research network to develop industry-leading deep packet inspection applications. The major application for this deployment is to identify and understand new traffic patterns created by large scale scientific computations and downloads such as the GRID (1 page).

  4. Sensor Deployment for Air Pollution Monitoring Using Public Transportation System

    OpenAIRE

    Yu, James J. Q.; Li, Victor O. K.; Lam, Albert Y. S.

    2015-01-01

    Air pollution monitoring is a very popular research topic and many monitoring systems have been developed. In this paper, we formulate the Bus Sensor Deployment Problem (BSDP) to select the bus routes on which sensors are deployed, and we use Chemical Reaction Optimization (CRO) to solve BSDP. CRO is a recently proposed metaheuristic designed to solve a wide range of optimization problems. Using the real world data, namely Hong Kong Island bus route data, we perform a series of simulations an...

  5. Deployment of a pentagonal hollow-rope tensegrity module

    OpenAIRE

    Rhode-Barbarigos , Landolf; Bel Hadj Ali , Nizar; Motro , René; Smith , Ian F.C.

    2011-01-01

    International audience; Tensegrity structures are spatial reticulated structures composed of cables and struts. Tensegrity systems are good candidates for adaptive and deployable structures and thus have applications in various engineering fields. A "hollow-rope" tensegrity system composed of tensegrity-ring modules has been demonstrated by the authors to be a viable system for a pedestrian bridge. This paper focuses on the deployment of pentagonal ring modules. A geometric study is performed...

  6. Kundenorientierte Produktentwicklung mit Hilfe von Quality Function Deployment (QFD)

    OpenAIRE

    Schloske, Alexander

    2011-01-01

    Die Produktentwicklung von heute muss in immer kürzeren Zeiträumen kunden- und kostenorientierte Produkte entwickeln. Zur systematischen Unterstützung dieser Aufgabe im Rahmen der Produktentwicklung wird die Methode Quality Function Deployment (QFD) eingesetzt. Die konsequente Umsetzung der Stimme des Kunden in die Sprache des Unternehmens gelingt mit Quality Function Deployment (QFD). Die Methode wertet systematisch Kundenanforderungen an Produkte aus und führt zu innovativen Lösungen, die s...

  7. Information Analysis Methodology for Border Security Deployment Prioritization and Post Deployment Evaluation

    International Nuclear Information System (INIS)

    Booker, Paul M.; Maple, Scott A.

    2010-01-01

    Due to international commerce, cross-border conflicts, and corruption, a holistic, information driven, approach to border security is required to best understand how resources should be applied to affect sustainable improvements in border security. The ability to transport goods and people by land, sea, and air across international borders with relative ease for legitimate commercial purposes creates a challenging environment to detect illicit smuggling activities that destabilize national level border security. Smuggling activities operated for profit or smuggling operations driven by cross border conflicts where militant or terrorist organizations facilitate the transport of materials and or extremists to advance a cause add complexity to smuggling interdiction efforts. Border security efforts are further hampered when corruption thwarts interdiction efforts or reduces the effectiveness of technology deployed to enhance border security. These issues necessitate the implementation of a holistic approach to border security that leverages all available data. Large amounts of information found in hundreds of thousands of documents can be compiled to assess national or regional borders to identify variables that influence border security. Location data associated with border topics of interest may be extracted and plotted to better characterize the current border security environment for a given country or region. This baseline assessment enables further analysis, but also documents the initial state of border security that can be used to evaluate progress after border security improvements are made. Then, border security threats are prioritized via a systems analysis approach. Mitigation factors to address risks can be developed and evaluated against inhibiting factor such as corruption. This holistic approach to border security helps address the dynamic smuggling interdiction environment where illicit activities divert to a new location that provides less resistance

  8. Energy landscapes, landscapes in transition. How to prepare one's territory to the deployment of renewable energies

    International Nuclear Information System (INIS)

    2014-06-01

    This guide first defines the notion of landscape, outlines what is at stake with decentralised renewable energy production, and presents the various important aspects of a deployment of decentralised renewable energy production. It describes how to define a general strategy for the integration of this production: relationship between energy and landscape, project implementation, partnership, tools to anticipate changes, evolution of social demand through dialogue, conciliation of technical and financial constraints and landscape ambitions. An appendix proposes legal and bibliographical information: legal relationships between energy and landscape, possible arrangements for PLU (plan local d'urbanisme, local urban plan) and SCOT (schema de coherence territoriale, territorial planning document)

  9. Guidance for Deployment of Mobile Technologies for Nuclear Power Plant Field Workers

    Energy Technology Data Exchange (ETDEWEB)

    Heather D. Medema; Ronald K. Farris

    2012-09-01

    This report is a guidance document prepared for the benefit of commercial nuclear power plants’ (NPPs) supporting organizations and personnel who are considering or undertaking deployment of mobile technology for the purpose of improving human performance and plant status control (PSC) for field workers in an NPP setting. This document especially is directed at NPP business managers, Electric Power Research Institute, Institute of Nuclear Power Operations, and other non-Information Technology personnel. This information is not intended to replace basic project management practices or reiterate these processes, but is to support decision-making, planning, and preparation of a business case.

  10. Perspectives on deployment of modular high temperature gas-cooled power plants

    International Nuclear Information System (INIS)

    Northup, T.E.; Penfield, S.

    1988-01-01

    Energy needs and energy options are undergoing re-evaluation by almost every country of the world. Energy issues such as safety, public perceptions, load growth, air pollution, acid rain, construction schedules, waste management, capital financing, project cancellations, and energy mix are but a few of those problems that are plaguing planners. This paper examines some of the key elements of the energy re-evaluation and transition that are in progress and the potential for the Modular High Temperature Gas-Cooled Reactor (Modular HTGR) to have a major impact on energy planning and its favorable prospects for deployment. (orig.)

  11. ACCELERATED SITE TECHNOLOGY DEPLOYMENT COST AND PERFORMANCE REPORT COMPARABILITY OF ISOCS INSTRUMENT IN RADIONUCLIDE CHARACTERICATION AT BROOKHAVEN NATIONAL LABORATORY

    Energy Technology Data Exchange (ETDEWEB)

    KALB,P.; LUCKETT,L.; MILLER,K.; GOGOLAK,C.; MILIAN,L.

    2001-03-01

    This report describes a DOE Accelerated Site Technology Deployment project being conducted at Brookhaven National Laboratory to deploy innovative, radiological, in situ analytical techniques. The technologies are being deployed in support of efforts to characterize the Brookhaven Graphite Research Reactor (BGRR) facility, which is currently undergoing decontamination and decommissioning. This report focuses on the deployment of the Canberra Industries In Situ Object Counting System (ISOCS) and assesses its data comparability to baseline methods of sampling and laboratory analysis. The battery-operated, field deployable gamma spectrometer provides traditional spectra of counts as a function of gamma energy. The spectra are then converted to radionuclide concentration by applying innovative efficiency calculations using monte carlo statistical methods and pre-defined geometry templates in the analysis software. Measurement of gamma emitting radionuclides has been accomplished during characterization of several BGRR components including the Pile Fan Sump, Above Ground Ducts, contaminated cooling fans, and graphite pile internals. Cs-137 is the predominant gamma-emitting radionuclide identified, with smaller quantities of Co-60 and Am-241 detected. The Project used the Multi-Agency Radiation Survey and Site Investigation Manual guidance and the Data Quality Objectives process to provide direction for survey planning and data quality assessment. Analytical results have been used to calculate data quality indicators (DQI) for the ISOCS measurements. Among the DQIs assessed in the report are sensitivity, accuracy, precision, bias, and minimum detectable concentration. The assessment of the in situ data quality using the DQIs demonstrates that the ISOCS data quality can be comparable to definitive level laboratory analysis when the field instrument is supported by an appropriate Quality Assurance Project Plan. A discussion of the results obtained by ISOCS analysis of

  12. ACCELERATED SITE TECHNOLOGY DEPLOYMENT COST AND PERFORMANCE REPORT COMPARABILITY OF ISOCS INSTRUMENT IN RADIONUCLIDE CHARACTERICATION AT BROOKHAVEN NATIONAL LABORATORY

    International Nuclear Information System (INIS)

    KALB, P.; LUCKETT, L.; MILLER, K.; GOGOLAK, C.; MILIAN, L.

    2001-01-01

    This report describes a DOE Accelerated Site Technology Deployment project being conducted at Brookhaven National Laboratory to deploy innovative, radiological, in situ analytical techniques. The technologies are being deployed in support of efforts to characterize the Brookhaven Graphite Research Reactor (BGRR) facility, which is currently undergoing decontamination and decommissioning. This report focuses on the deployment of the Canberra Industries In Situ Object Counting System (ISOCS) and assesses its data comparability to baseline methods of sampling and laboratory analysis. The battery-operated, field deployable gamma spectrometer provides traditional spectra of counts as a function of gamma energy. The spectra are then converted to radionuclide concentration by applying innovative efficiency calculations using monte carlo statistical methods and pre-defined geometry templates in the analysis software. Measurement of gamma emitting radionuclides has been accomplished during characterization of several BGRR components including the Pile Fan Sump, Above Ground Ducts, contaminated cooling fans, and graphite pile internals. Cs-137 is the predominant gamma-emitting radionuclide identified, with smaller quantities of Co-60 and Am-241 detected. The Project used the Multi-Agency Radiation Survey and Site Investigation Manual guidance and the Data Quality Objectives process to provide direction for survey planning and data quality assessment. Analytical results have been used to calculate data quality indicators (DQI) for the ISOCS measurements. Among the DQIs assessed in the report are sensitivity, accuracy, precision, bias, and minimum detectable concentration. The assessment of the in situ data quality using the DQIs demonstrates that the ISOCS data quality can be comparable to definitive level laboratory analysis when the field instrument is supported by an appropriate Quality Assurance Project Plan. A discussion of the results obtained by ISOCS analysis of

  13. Financing of Chamera project

    International Nuclear Information System (INIS)

    Jain, A.K.; Chakraborty, D.K.

    1994-01-01

    Chamera Hydroelectric Project was selected by National Hydroelectric Power Corporation (NHPC) as a pilot project for accelerated development of hydro-power in the country. This project was considered to have certain distinct specialties from different aspects in comparison with other projects. In the first place, the field investigation for the project was completed in a record time of only eight months by deploying the most modern techniques. Secondly, Chamera was the first NHPC project with external aid both technically and financially. The third and most important of all the specialties was in the planned reduction of construction period to 6 years from the original estimate of 8 years. Such reduction of gestation period was considered to be the direct outcome of modern method of management, monitoring and improved imported technology. The investment decision in the project was taken in April '84 with an estimated cost of energy at busbar 44.12 paise/unit exclusive of return on equity capital and royalty payable to the home state. The all inclusive rate of power was estimated 75.86 paise/unit. (author). 4 tabs

  14. Exploiting the oil-GDP effect to support renewables deployment

    International Nuclear Information System (INIS)

    Awerbuch, Shimon; Sauter, Raphael

    2006-01-01

    The empirical evidence from a growing body of academic literature clearly suggests that oil price increases and volatility dampen macroeconomic growth by raising inflation and unemployment and by depressing the value of financial and other assets. Surprisingly, this issue seems to have received little attention from energy policy makers. In percentage terms, the oil-GDP effect is relatively small, producing losses in the order of 0.5% of GDP for a 10% oil price increase. In absolute terms however, even a 10% oil price rise-oil has risen at least 50% in the last year alone-produces GDP losses that, could they have been averted, would significantly offset the cost of increased RE deployment. This paper draws on the empirical oil-GDP literature, which we summarize, to show that (i) by displacing gas and oil, renewable energy investments can help nations avoid costly macroeconomic losses produced by the oil-GDP effect and (ii) that these avoided losses represent a significant external macroeconomic benefit of such investments. We show that a 10% increase in RE share avoids GDP losses in the range of $29-$53 billion in the US and the EU ($49-$90 billion for OECD). These avoided losses offset one-fifth of the RE investment needs projected by the EREC and half the OECD investment projected by a G-8 Task Force. For the US, the figures further suggest that each additional kW of renewables, on average, avoids $250-$450 in GDP losses, a figure that varies across technologies as a function of annual capacity factors. We approximate that the offset is worth $200/kW for wind and solar and $800/kW for geothermal and biomass. While we focus only on renewables, the GDP offset will apply in some measure to other non-fossil technologies including energy efficiency, DSM and nuclear. The societal valuation of non-fossil alternatives must reflect these avoided GDP losses, whose benefit is not fully captured by private investors. This said, we fully recognize that wealth created in this

  15. Exploiting the oil-GDP effect to support renewables deployment

    International Nuclear Information System (INIS)

    Awerbuch, S.; Sauter, R.

    2006-01-01

    The empirical evidence from a growing body of academic literature clearly suggests that oil price increases and volatility dampen macroeconomic growth by raising inflation and unemployment and by depressing the value of financial and other assets. Surprisingly, this issue seems to have received little attention from energy policy makers. In percentage terms, the oil-GDP effect is relatively small, producing losses in the order of 0.5% of GDP for a 10% oil price increase. In absolute terms however, even a 10% oil price rise-oil has risen at least 50% in the last year alone-produces GDP losses that, could they have been averted, would significantly offset the cost of increased RE deployment. This paper draws on the empirical oil-GDP literature, which we summarize, to show that (i) by displacing gas and oil, renewable energy investments can help nations avoid costly macroeconomic losses produced by the oil-GDP effect and, (ii) that these avoided losses represent a significant external macroeconomic benefit of such investments. We show that a 10% increase in RE share avoids GDP losses in the range of $29-$53 billion in the US and the EU ($49-$90 billion for OECD). These avoided losses offset one-fifth of the RE investment needs projected by the EREC and half the OECD investment projected by a G-8 Task Force. For the US, the figures further suggest that each additional kW of renewables, on average, avoids $250-$450 in GDP losses, a figure that varies across technologies as a function of annual capacity factors. We approximate that the offset is worth $200/kW for wind and solar and $800/kW for geothermal and biomass. While we focus only on renewables, the GDP offset will apply in some measure to other non-fossil technologies including energy efficiency, DSM and nuclear. The societal valuation of non-fossil alternatives must reflect these avoided GDP losses, whose benefit is not fully captured by private investors. This said, we fully recognize that wealth created in this

  16. Pre-defined and optional staging for the deployment of enterprise systems: a case study and a framework

    Science.gov (United States)

    Lichtenstein, Yossi; Cucuy, Shy; Fink, Lior

    2017-03-01

    The effective deployment of enterprise systems has been a major challenge for many organisations. Customising the new system, changing business processes, and integrating multiple information sources are all difficult tasks. As such, they are typically done in carefully planned stages in a process known as phased implementation. Using ideas from Option Theory, this article critiques aspects of phased implementation. One customer relationship management (CRM) project and its phased implementation are described in detail and ten other enterprise system deployments are summarised as a basis for the observation that almost all deployment stages are pre-defined operational steps rather than decision points. However, Option Theory suggests that optional stages, to be used only when risk materialises, should be integral parts of project plans. Although such optional stages are often more valuable than pre-defined stages, the evidence presented in this article shows that they are only rarely utilised. Therefore, a simple framework is presented; it first identifies risks related to the deployment of enterprise systems, then identifies optional stages that can mitigate these risks, and finally compares the costs and benefits of both pre-defined and optional stages.

  17. Using Deduplicating Storage for Efficient Disk Image Deployment

    Directory of Open Access Journals (Sweden)

    Xing Lin

    2015-08-01

    Full Text Available Many clouds and network testbeds use disk images to initialize local storage on their compute devices. Large facilities must manage thousands or more images, requiring significant amounts of storage. At the same time, to provide a good user experience, they must be able to deploy those images quickly. Driven by our experience in operating the Emulab site at the University of Utah---a long-lived and heavily-used testbed---we have created a new service for efficiently storing and deploying disk images. This service exploits the redundant data found in similar images, using deduplication to greatly reduce the amount of physical storage required. In addition to space savings, our system is also designed for highly efficient image deployment---it integrates with an existing highly-optimized disk image deployment system, Frisbee, without significantly increasing the time required to distribute and install images. In this paper, we explain the design of our system and discuss the trade-offs we made to strike a balance between efficient storage and fast disk image deployment. We also propose a new chunking algorithm, called AFC, which enables fixed-size chunking for deduplicating allocated disk sectors. Experimental results show that our system reduces storage requirements by up to 3x while imposing only a negligible runtime overhead on the end-to-end disk-deployment process.

  18. Applications of Dynamic Deployment of Services in Industrial Automation

    Science.gov (United States)

    Candido, Gonçalo; Barata, José; Jammes, François; Colombo, Armando W.

    Service-oriented Architecture (SOA) is becoming a de facto paradigm for business and enterprise integration. SOA is expanding into several domains of application envisioning a unified solution suitable across all different layers of an enterprise infrastructure. The application of SOA based on open web standards can significantly enhance the interoperability and openness of those devices. By embedding a dynamical deployment service even into small field de- vices, it would be either possible to allow machine builders to place built- in services and still allow the integrator to deploy on-the-run the services that best fit his current application. This approach allows the developer to keep his own preferred development language, but still deliver a SOA- compliant application. A dynamic deployment service is envisaged as a fundamental framework to support more complex applications, reducing deployment delays, while increasing overall system agility. As use-case scenario, a dynamic deployment service was implemented over DPWS and WS-Management specifications allowing designing and programming an automation application using IEC61131 languages, and deploying these components as web services into devices.

  19. Joint deployment of refuelling infrastructure and vehicles

    International Nuclear Information System (INIS)

    Smith, R.

    2010-01-01

    A wide range of fuels will be used in future transportation technologies. This presentation discussed refuelling infrastructure solutions for alternative fuels. A well-placed demonstration infrastructure will help to accelerate market development. Stakeholder collaboration is needed to create high value business paradigms and identify stakeholder benefits. Infrastructure paradigms include the home; businesses; retail public refuelling forecourts; and multi-fuel waste heat recovery sites. Commercial nodes can be developed along major transportation routes. Stakeholder groups include technology providers, supply chain and service providers, commercial end-users, and government. A successful alternative fuel infrastructure model will consider market development priorities, time frames and seed investment opportunities. Applications must be market-driven in order to expand. A case study of the natural gas vehicle (NGV) program in Ontario was also discussed, as well as various hydrogen projects. tabs., figs.

  20. Experiences and recommendations in deploying a real-time, water quality monitoring system

    Science.gov (United States)

    O'Flynn, B.; Regan, F.; Lawlor, A.; Wallace, J.; Torres, J.; O'Mathuna, C.

    2010-12-01

    Monitoring of water quality at a river basin level to meet the requirements of the Water Framework Directive (WFD) using conventional sampling and laboratory-based techniques poses a significant financial burden. Wireless sensing systems offer the potential to reduce these costs considerably, as well as provide more useful, continuous monitoring capabilities by giving an accurate idea of the changing environmental and water quality in real time. It is unlikely that the traditional spot/grab sampling will provide a reasonable estimate of the true maximum and/or mean concentration for a particular physicochemical variable in a water body with marked temporal variability. When persistent fluctuations occur, it is likely only to be detected through continuous measurements, which have the capability of detecting sporadic peaks of concentration. Thus, in situ sensors capable of continuous sampling of parameters required under the WFD would therefore provide more up-to-date information, cut monitoring costs and provide better coverage representing long-term trends in fluctuations of pollutant concentrations. DEPLOY is a technology demonstration project, which began planning and station selection and design in August 2008 aiming to show how state-of-the-art technology could be implemented for cost-effective, continuous and real-time monitoring of a river catchment. The DEPLOY project is seen as an important building block in the realization of a wide area autonomous network of sensors capable of monitoring the spatial and temporal distribution of important water quality and environmental target parameters. The demonstration sites chosen are based in the River Lee, which flows through Ireland's second largest city, Cork, and were designed to include monitoring stations in five zones considered typical of significant river systems--these monitor water quality parameters such as pH, temperature, depth, conductivity, turbidity and dissolved oxygen. Over one million data points

  1. PERANCANGAN CASING DAN TATA LETAK KOMPONEN OZONIZER PENGAWET MAKANAN MENGGUNAKAN METODE QUALITY FUNCTION DEPLOYMENT (QFD

    Directory of Open Access Journals (Sweden)

    Zainal Fanani

    2012-02-01

    Full Text Available Penelitian ini berisi tentang perancangan casing dan tata letak komponen ozonizer pengawet makanan. Proses perancangan produk dilakukan dengan menggunakan metode Quality Function Deployment (QFD pada fase perencanaan produk (Product Planning dan fase perencanaan disain (Design Planning. Pada fase perencanaan produk, dilakukan identifikasi kebutuhan konsumen terhadap ozonizer pengawet makanan. Pengumpulan data mengenai kebutuhan konsumen diperoleh dari penyebaran angket (kuisioner kepada pengguna produk, yaitu rumah makan dan industri makanan. Setelah diperoleh daftar kebutuhan konsumen, kebutuhan-kebutuhan tersebut kemudian diolah menggunakan metode QFD pada fase perencanaan produk hingga diperoleh spestifikasi teknis produk dan House of Quality (HOQ. Spesifikasi teknis produk ini akan digunakan sebagai acuan dalam menyusun fase kedua proses QFD, yaitu fase perencanaan disain. Pada fase perencanaan disain, dihasilkan beberapa sketsa alternatif solusi. Alternatif solusi disain tersebut kemudian dievaluasi dan dilakukan penilaian untuk memilih solusi disain produk ozonizer pengawet makanan. Setelah solusi disain produk ozonizer dipilih, alternatif solusi tersebut kemudian dirancang secara detail, dan kemudian dibuat prototype produk. Prototype produk  yang dibuat adalah prototype visual, yakni gambar disain yang dianimasi untuk melihat proses perakitan, penyusunan tata letak komponen penyusun produk dan penyusunan display dan panel operasi produk. Kata Kunci   :   Kebutuhan konsumen, Quality Function Deployment, Spesifikasi Teknis Produk, Solusi Disain, Prototype Disain Produk     This research contains about casing project and ozonizer component layout of food preservative. The project is practiced using Quality Function Deployment (QFD method on product planning and design planning phase. In product planning phase, there is identification about consumer needs in ozonizer food preservative. Collecting data about consumer needs are received

  2. Experiences and recommendations in deploying a real-time, water quality monitoring system

    International Nuclear Information System (INIS)

    O'Flynn, B; O'Mathuna, C; Regan, F; Lawlor, A; Wallace, J; Torres, J

    2010-01-01

    Monitoring of water quality at a river basin level to meet the requirements of the Water Framework Directive (WFD) using conventional sampling and laboratory-based techniques poses a significant financial burden. Wireless sensing systems offer the potential to reduce these costs considerably, as well as provide more useful, continuous monitoring capabilities by giving an accurate idea of the changing environmental and water quality in real time. It is unlikely that the traditional spot/grab sampling will provide a reasonable estimate of the true maximum and/or mean concentration for a particular physicochemical variable in a water body with marked temporal variability. When persistent fluctuations occur, it is likely only to be detected through continuous measurements, which have the capability of detecting sporadic peaks of concentration. Thus, in situ sensors capable of continuous sampling of parameters required under the WFD would therefore provide more up-to-date information, cut monitoring costs and provide better coverage representing long-term trends in fluctuations of pollutant concentrations. DEPLOY is a technology demonstration project, which began planning and station selection and design in August 2008 aiming to show how state-of-the-art technology could be implemented for cost-effective, continuous and real-time monitoring of a river catchment. The DEPLOY project is seen as an important building block in the realization of a wide area autonomous network of sensors capable of monitoring the spatial and temporal distribution of important water quality and environmental target parameters. The demonstration sites chosen are based in the River Lee, which flows through Ireland's second largest city, Cork, and were designed to include monitoring stations in five zones considered typical of significant river systems-–these monitor water quality parameters such as pH, temperature, depth, conductivity, turbidity and dissolved oxygen. Over one million data

  3. Everybody Wins: How the IceCube Collaboration Capitalizes Teacher Deployments to the South Pole

    Science.gov (United States)

    Madsen, J.

    2017-12-01

    Over the last fifteen years, the IceCube Collaboration and its predecessor AMANDA have hosted eight teachers at South Pole with the ninth scheduled to deploy in the upcoming 2017-18 season. These deployments have been organized in conjunction with NSF funded programs that pair polar researchers with teachers. Teachers Experiencing the Arctic and Antarctica in the early years, and now PolarTREC, provide valuable structure, general training, build community among polar researchers and teachers, and archive resources developed by participants. The IceCube Collaboration has developed a successful team building approach for newly selected teachers that utilizes past polar teachers. For about a decade, we have provided a two week summer residential science course for a diverse group of ninth to twelve grade students in the University of Wisconsin-River Falls Upward Bound program. An authentic research experience is delivered by focusing on the process of science using a different accessible and meaningful project each year. For example, this summer students learned about design and construction by creating their own LED-embedded clothing. They programmed a microcontroller so the LEDs responded to an external input such as motion or sound. This panel presentation in the K-12 Education/Outreach: Effective Partnerships between Scientists and K-12 Teachers/Informal Educators including Authentic Student Research session will describe how this is a win for all involved. It gives the new teacher extensive opportunities to learn about living and working at the South Pole from past teachers, experience integrating into to an established team as they will do when they deploy, and lets them see creative ways to incorporate IceCube research into the classroom. It also provides a rich active learning experience for the UWRF Upward Bound students, and a way to keep engaged with teachers who have deployed in the past.

  4. Lessons Learned in Deploying the World s Largest Scale Lustre File System

    Energy Technology Data Exchange (ETDEWEB)

    Dillow, David A [ORNL; Fuller, Douglas [ORNL; Wang, Feiyi [ORNL; Oral, H Sarp [ORNL; Zhang, Zhe [ORNL; Hill, Jason J [ORNL; Shipman, Galen M [ORNL

    2010-01-01

    The Spider system at the Oak Ridge National Laboratory's Leadership Computing Facility (OLCF) is the world's largest scale Lustre parallel file system. Envisioned as a shared parallel file system capable of delivering both the bandwidth and capacity requirements of the OLCF's diverse computational environment, the project had a number of ambitious goals. To support the workloads of the OLCF's diverse computational platforms, the aggregate performance and storage capacity of Spider exceed that of our previously deployed systems by a factor of 6x - 240 GB/sec, and 17x - 10 Petabytes, respectively. Furthermore, Spider supports over 26,000 clients concurrently accessing the file system, which exceeds our previously deployed systems by nearly 4x. In addition to these scalability challenges, moving to a center-wide shared file system required dramatically improved resiliency and fault-tolerance mechanisms. This paper details our efforts in designing, deploying, and operating Spider. Through a phased approach of research and development, prototyping, deployment, and transition to operations, this work has resulted in a number of insights into large-scale parallel file system architectures, from both the design and the operational perspectives. We present in this paper our solutions to issues such as network congestion, performance baselining and evaluation, file system journaling overheads, and high availability in a system with tens of thousands of components. We also discuss areas of continued challenges, such as stressed metadata performance and the need for file system quality of service alongside with our efforts to address them. Finally, operational aspects of managing a system of this scale are discussed along with real-world data and observations.

  5. Deployment Experiences of British Army Wives Before, During and After Deployment: Satisfaction with Military Life and Use of Support Networks

    National Research Council Canada - National Science Library

    Dandeker, Christopher; French, Claire; Birtles, Catherine; Wessely, S

    2006-01-01

    Introduction and Aims: During deployments, Service wives have to adapt to being alone and taking sole responsibility for their families and house-holds whilst dealing with the additional stress about whether their loved ones will return...

  6. 49 CFR 268.17 - Project selection criteria.

    Science.gov (United States)

    2010-10-01

    ... criteria will govern FRA's selection of projects to receive funding under the Maglev Deployment Program. (a... are to be expected in the United States. (4) The degree to which the project will augment a Maglev... development status of the Maglev technology selected by the applicant for the project. (c) Benefits for the...

  7. IEA Wind Task 23 Offshore Wind Technology and Deployment. Subtask 1 Experience with Critical Deployment Issues. Final Technical Report

    OpenAIRE

    Lemming, Jørgen Kjærgaard

    2010-01-01

    The final report for IEA Wind Task 23, Offshore Wind Energy Technology and Deployment, is made up of two separate reports: Subtask 1: Experience with Critical Deployment Issues and Subtask 2: Offshore Code Comparison Collaborative (OC3). The Subtask 1 report included here provides background information and objectives of Task 23. It specifically discusses ecological issues and regulation, electrical system integration and offshore wind, external conditions, and key conclusions for Subtask 1. ...

  8. Gender differences in the effects of deployment-related stressors and pre-deployment risk factors on the development of PTSD symptoms in National Guard Soldiers deployed to Iraq and Afghanistan.

    Science.gov (United States)

    Polusny, Melissa A; Kumpula, Mandy J; Meis, Laura A; Erbes, Christopher R; Arbisi, Paul A; Murdoch, Maureen; Thuras, Paul; Kehle-Forbes, Shannon M; Johnson, Alexandria K

    2014-02-01

    Although women in the military are exposed to combat and its aftermath, little is known about whether combat as well as pre-deployment risk/protective factors differentially predict post-deployment PTSD symptoms among women compared to men. The current study assesses the influence of combat-related stressors and pre-deployment risk/protective factors on women's risk of developing PTSD symptoms following deployment relative to men's risk. Participants were 801 US National Guard Soldiers (712 men, 89 women) deployed to Iraq or Afghanistan who completed measures of potential risk/protective factors and PTSD symptoms one month before deployment (Time 1) and measures of deployment-related stressors and PTSD symptoms about 2-3 months after returning from deployment (Time 2). Men reported greater exposure to combat situations than women, while women reported greater sexual stressors during deployment than men. Exposure to the aftermath of combat (e.g., witnessing injured/dying people) did not differ by gender. At Time 2, women reported more severe PTSD symptoms and higher rates of probable PTSD than did men. Gender remained a predictor of higher PTSD symptoms after accounting for pre-deployment symptoms, prior interpersonal victimization, and combat related stressors. Gender moderated the association between several risk factors (combat-related stressors, prior interpersonal victimization, lack of unit support and pre-deployment concerns about life/family disruptions) and post-deployment PTSD symptoms. Elevated PTSD symptoms among female service members were not explained simply by gender differences in pre-deployment or deployment-related risk factors. Combat related stressors, prior interpersonal victimization, and pre-deployment concerns about life and family disruptions during deployment were differentially associated with greater post-deployment PTSD symptoms for women than men. Copyright © 2013 The Authors. Published by Elsevier Ltd.. All rights reserved.

  9. Scientific Grid activities and PKI deployment in the Cybermedia Center, Osaka University.

    Science.gov (United States)

    Akiyama, Toyokazu; Teranishi, Yuuichi; Nozaki, Kazunori; Kato, Seiichi; Shimojo, Shinji; Peltier, Steven T; Lin, Abel; Molina, Tomas; Yang, George; Lee, David; Ellisman, Mark; Naito, Sei; Koike, Atsushi; Matsumoto, Shuichi; Yoshida, Kiyokazu; Mori, Hirotaro

    2005-10-01

    The Cybermedia Center (CMC), Osaka University, is a research institution that offers knowledge and technology resources obtained from advanced researches in the areas of large-scale computation, information and communication, multimedia content and education. Currently, CMC is involved in Japanese national Grid projects such as JGN II (Japan Gigabit Network), NAREGI and BioGrid. Not limited to Japan, CMC also actively takes part in international activities such as PRAGMA. In these projects and international collaborations, CMC has developed a Grid system that allows scientists to perform their analysis by remote-controlling the world's largest ultra-high voltage electron microscope located in Osaka University. In another undertaking, CMC has assumed a leadership role in BioGrid by sharing its experiences and knowledge on the system development for the area of biology. In this paper, we will give an overview of the BioGrid project and introduce the progress of the Telescience unit, which collaborates with the Telescience Project led by the National Center for Microscopy and Imaging Research (NCMIR). Furthermore, CMC collaborates with seven Computing Centers in Japan, NAREGI and National Institute of Informatics to deploy PKI base authentication infrastructure. The current status of this project and future collaboration with Grid Projects will be delineated in this paper.

  10. An ARM Mobile Facility Designed for Marine Deployments

    Science.gov (United States)

    Wiscombe, W. J.

    2007-05-01

    The U.S. Dept. of Energy's ARM (Atmospheric Radiation Measurements) Program is designing a Mobile Facility exclusively for marine deployments. This marine facility is patterned after ARM's land Mobile Facility, which had its inaugural deployment at Point Reyes, California, in 2005, followed by deployments to Niger in 2006 and Germany in 2007 (ongoing), and a planned deployment to China in 2008. These facilities are primarily intended for the study of clouds, radiation, aerosols, and surface processes with a goal to include these processes accurately in climate models. They are preferably embedded within larger field campaigns which provide context. They carry extensive instrumentation (in several large containers) including: cloud radar, lidar, microwave radiometers, infrared spectrometers, broadband and narrowband radiometers, sonde-launching facilities, extensive surface aerosol measurements, sky imagers, and surface latent and sensible heat flux devices. ARM's Mobile Facilities are designed for 6-10 month deployments in order to capture climatically-relevant datasets. They are available to any scientist, U.S. or international, who wishes to submit a proposal during the annual Spring call. The marine facility will be adapted to, and ruggedized for, the harsh marine environment and will add a scanning two-frequency radar, a boundary-layer wind profiler, a shortwave spectrometer, and aerosol instrumentation adapted to typical marine aerosols like sea salt. Plans also include the use of roving small UAVs, automated small boats, and undersea autonomous vehicles in order to address the point-to-area-average problem which is so crucial for informing climate models. Initial deployments are planned for small islands in climatically- interesting cloud regimes, followed by deployments on oceanic platforms (like decommissioned oil rigs and the quasi-permanent platform of this session's title) and eventually on large ships like car carriers plying routine routes.

  11. Deployment of a Long-Term Broadband Seafloor Observatory in Monterey Bay

    Science.gov (United States)

    McGill, P.; Neuhauser, D.; Stakes, D.; Romanowicz, B.; Ramirez, T.; Uhrhammer, R.

    2002-12-01

    MOBB (Monterey bay Ocean floor Broad Band project) is a collaborative project between the Monterey Bay Aquarium Research Institute (MBARI) and the Berkeley Seismological Laboratory (BSL). Its goal is to install and operate a permanent seafloor broadband seismic station as a first step towards extending the on-shore broadband seismic network in northern California to the seaside of the North-America/Pacific plate boundary, providing better azimuthal coverage for regional earthquake and structure studies. The successful MOBB deployment took place 40km off shore at a water depth of 1000m during three dives on April 9-11, 2002. The seismometer was buried in a 60-cm deep caisson, which was later back filled with glass beads to stabilize the instrument. New tools, including a high-pressure water-jet excavator, were developed for the ROV Ventana to accomplish these tasks. The ocean-bottom MOBB station currently comprises a three-component seismometer package, a current-meter, and a recording and battery package. Data recovery dives, during which the recording and battery package will be exchanged, are planned every three months for the next three years. A differential pressure gauge (DPG) (Cox et al., 1984) will be deployed as part of the recording package during the next data recovery dive in September 2002. The station is currently recording data autonomously. Eventually, it will be linked to the planned (and recently funded) MARS (Monterey Accelerated Research System; rl {http://www.mbari.org/mars/}) cable and provide real-time, continuous seismic data to be merged with the rest of the northern California real-time seismic system. The data are archived at the NCEDC for on-line availability, as part of the Berkeley Digital Seismic Network (BDSN). This project follows the 1997 MOISE experiment, in which a three-component broadband system was deployed for a period of three months, 40km off shore in Monterey Bay. MOISE was a cooperative program sponsored by MBARI, UC

  12. The impact of antecedent trauma exposure and mental health symptoms on the post-deployment mental health of Afghanistan-deployed Australian troops.

    Science.gov (United States)

    Searle, Amelia K; Van Hooff, Miranda; Lawrence-Wood, Ellie R; Grace, Blair S; Saccone, Elizabeth J; Davy, Carol P; Lorimer, Michelle; McFarlane, Alexander C

    2017-10-01

    Both traumatic deployment experiences and antecedent traumas increase personnel's risk of developing PTSD and depression. However, only cross-sectional studies have assessed whether antecedent trauma moderates stress reactions to deployment experiences. This study prospectively examines whether antecedent trauma moderates the association between deployment trauma and post-deployment PTSD and depressive symptoms after accounting for antecedent mental health problems, in a large Australian Defence Force (ADF) sample. In the ADF Middle East Area of Operations Prospective Study, currently-serving military personnel deployed to Afghanistan across 2010-2012 (n = 1122) completed self-reported measures at pre-deployment and post-deployment. Within multivariable regressions, associations between deployment trauma and PTSD and depressive symptoms at post-deployment were stronger for personnel with greater antecedent trauma. However, once adjusting for antecedent mental health problems, these significant interaction effects disappeared. Instead, deployment-related trauma and antecedent mental health problems showed direct associations with post-deployment mental health problems. Antecedent trauma was also indirectly associated with post-deployment mental health problems through antecedent mental health problems. Similar associations were seen with prior combat exposure as a moderator. Antecedent and deployment trauma were reported retrospectively. Self-reports may also suffer from social desirability bias, especially at pre-deployment. Our main effects results support the pervasive and cumulative negative effect of trauma on military personnel, regardless of its source. While antecedent trauma does not amplify personnel's psychological response to deployment trauma, it is indirectly associated with increased post-deployment mental health problems. Antecedent mental health should be considered within pre-deployment prevention programs, and deployment-trauma within post

  13. A trust fund approach to accelerating deployment of CCS: options and considerations

    Energy Technology Data Exchange (ETDEWEB)

    Naomi Pena; Edward S. Rubin

    2008-01-15

    The paper discusses one possible avenue to accelerate deployment of carbon dioxide capture and sequestration (CCS) technologies: use of a special-purpose CCS Trust Fund. A CCS Trust Fund financed, for example, through fees on coal-based or fossil fuel-based electricity generation may have a role in reducing CO{sub 2} emissions from power plants because it could: raise funds at the scale needed to support a significant number (e.g., 10 to 30) of commercial-scale CCS projects; ensure that the funds raised would be used to demonstrate CCS at commercial scale for a full range of systems applicable to U.S. power plants; establish the true costs, reliability, and operability of power plants with CCS; utilize private-sector business standards for project selection and management to ensure program cost effectiveness; and significantly reduce CCS costs within 10 to 15 years by supporting approximately 30 demonstrations, yielding substantial national economic benefits as CCS becomes widely deployed. The United States has considerable experience with trust funds. While no single existing fund illustrates all the features that might be desirable for a CCS Trust Fund, lessons from prior U.S. experience can be used to design an effective, efficient mechanism for advancing commercial-scale deployment of CCS. In particular, experience has indicated the importance of financial self-sufficiency, private-sector management standards, insulation from the annual Congressional appropriations process, and termination upon completion of objectives. Carefully crafted enabling legislation and, most likely, use of a quasi-public or private entity to manage a CCS Trust Fund will be needed to incorporate these and other desirable features. 25 refs., 1 tab., 1 app.

  14. How and when China will exceed its renewable energy deployment targets

    International Nuclear Information System (INIS)

    Santalco, Aldo

    2012-01-01

    This paper is focused on the renewable energy targets set by China in its 12th National Development Plan 2011–2015. In particular, the paper examines deployment targets and the means to achieve them, for hydro, wind and solar. These are its priority technologies, in which the country has a level of competitive advantage. For each of these energy sources, four projections have been produced. These projections show whether and when China will meet its deployment targets in terms of the cumulative amount of gigawatts (GW) of installed capacity by 2015. In doing this, historical data from 2005 to 2010 has been analyzed for all three energy sources. Both the average annual growth rate (AAGR), and the compound average growth rate (CAGR) have been computed, in terms of the world averages and China's national performance over this period. AAGR and CAGR have been used for producing four scenarios for each renewable energy, and a logarithmic scale has been applied to them in order to make them more reliable by smoothing out excessive fluctuations. The most likely scenarios for each technology are described. Finally, the gap between these scenarios and the respective national targets set for 2015 and 2020 are calculated. - Highlights: ► The competitive advantages of China for the Renewable Energy Deployment Targets. ► Hydro target met by 2012 with a GW level higher than 31% the target by 2015. ► Wind target met by 2012 with a GW level higher than 35% the target by 2015. ► Solar target met by 2014 with a GW level higher than 23% the target by 2015. ► Best scenarios and gap analysis for 2015 and 2020 targets.

  15. Road to Grid Parity through Deployment of Low-Cost 21.5% N-Type Si Solar Cells

    Energy Technology Data Exchange (ETDEWEB)

    Velundur, Vijay [Suniva, Norcross, GA (United States)

    2017-04-19

    This project seeks to develop and deploy differentiated 21.5% efficient n-type Si solar cells while reaching the SunShot module cost goal of ≤ $0.50/W. This objective hinges on development of enabling low cost technologies that simplify the manufacturing process and reduce overall processing costs. These comprise of (1) Boron emitter formation and passivation; (2) Simplified processing process for emitter and BSF layers; and (3) Advanced metallization for the front and back contacts.

  16. Standardization of transportation classes for object-oriented deployment simulations.

    Energy Technology Data Exchange (ETDEWEB)

    Burke, J. F., Jr.; Howard, D. L.; Jackson, J.; Macal, C. M.; Nevins, M. R.; Van Groningen, C. N.

    1999-07-30

    Many recent efforts to integrate transportation and deployment simulations, although beneficial, have lacked a feature vital for seamless integration: a common data class representation. It is an objective of the Department of Defense (DoD) to standardize all classes used in object-oriented deployment simulations by developing a standard class attribute representation and behavior for all deployment simulations that rely on an underlying class representation. The Extensive Hierarchy and Object Representation for Transportation Simulations (EXHORT) is a collection of three hierarchies that together will constitute a standard and consistent class attribute representation and behavior that could be used directly by a large set of deployment simulations. The first hierarchy is the Transportation Class Hierarchy (TCH), which describes a significant portion of the defense transportation system; the other two deal with infrastructure and resource classes. EXHORT will allow deployment simulations to use the same set of underlying class data, ensure transparent exchanges, reduce the effort needed to integrate simulations, and permit a detailed analysis of the defense transportation system. This paper describes EXHORT's first hierarchy, the TCH, and provides a rationale for why it is a helpful tool for modeling major portions of the defense transportation system.

  17. Post-deployment family violence among UK military personnel.

    Science.gov (United States)

    Kwan, Jamie; Jones, Margaret; Somaini, Greta; Hull, Lisa; Wessely, Simon; Fear, Nicola T; MacManus, Deirdre

    2017-12-19

    Research into violence among military personnel has not differentiated between stranger- and family-directed violence. While military factors (combat exposure and post-deployment mental health problems) are risk factors for general violence, there has been limited research on their impact on violence within the family environment. This study aims to compare the prevalence of family-directed and stranger-directed violence among a deployed sample of UK military personnel and to explore risk factors associated with both family- and stranger-directed violence. This study utilised data from a large cohort study which collected information by questionnaire from a representative sample of randomly selected deployed UK military personnel (n = 6711). The prevalence of family violence immediately following return from deployment was 3.6% and 7.8% for stranger violence. Family violence was significantly associated with having left service, while stranger violence was associated with younger age, male gender, being single, having a history of antisocial behaviour as well as having left service. Deployment in a combat role was significantly associated with both family and stranger violence after adjustment for confounders [adjusted odds ratio (aOR) = 1.92 (1.25-2.94), p = 0.003 and aOR = 1.77 (1.31-2.40), p violence both inside and outside the family environment and should be considered in violence reduction programmes for military personnel. Further research using a validated measurement tool for family violence would improve comparability with other research.

  18. Automated Deployment of Advanced Controls and Analytics in Buildings

    Science.gov (United States)

    Pritoni, Marco

    Buildings use 40% of primary energy in the US. Recent studies show that developing energy analytics and enhancing control strategies can significantly improve their energy performance. However, the deployment of advanced control software applications has been mostly limited to academic studies. Larger-scale implementations are prevented by the significant engineering time and customization required, due to significant differences among buildings. This study demonstrates how physics-inspired data-driven models can be used to develop portable analytics and control applications for buildings. Specifically, I demonstrate application of these models in all phases of the deployment of advanced controls and analytics in buildings: in the first phase, "Site Preparation and Interface with Legacy Systems" I used models to discover or map relationships among building components, automatically gathering metadata (information about data points) necessary to run the applications. During the second phase: "Application Deployment and Commissioning", models automatically learn system parameters, used for advanced controls and analytics. In the third phase: "Continuous Monitoring and Verification" I utilized models to automatically measure the energy performance of a building that has implemented advanced control strategies. In the conclusions, I discuss future challenges and suggest potential strategies for these innovative control systems to be widely deployed in the market. This dissertation provides useful new tools in terms of procedures, algorithms, and models to facilitate the automation of deployment of advanced controls and analytics and accelerate their wide adoption in buildings.

  19. Biomarkers of post-deployment resilience among military service members

    Directory of Open Access Journals (Sweden)

    Krista B. Highland

    2015-01-01

    Full Text Available The development of PTSD after military deployment is influenced by a combination of biopsychosocial risk and resilience factors. In particular, physiological factors may mark risk for symptom progression or resiliency. Research in civilian populations suggests elevated catecholamines after trauma are associated with PTSD months following the trauma. However, less is known regarding physiological markers of PTSD resilience among post-deployment service members (SM. We therefore assessed whether catecholamines obtained shortly after deployment were associated with combat-related PTSD symptoms three months later. Eighty-seven SMs completed the Clinician-Administered PTSD Scale for DSM-IV and blood draws within two months after return from deployment to Iraq or Afghanistan (“Time 1” or “T1” and three months later (“Time 2” or “T2”. Linear regression analyses demonstrated that lower norepinephrine at T1 was associated with lower PTSD symptoms at T2. In particular, T1 norepinephrine was positively associated with T2 symptom intensity and avoidance symptoms. The present findings represent a biologically-informed method of assessing PTSD resilience after deployment, which may aid clinicians in providing tailored treatments for those in the greatest need. Further research is needed to validate these findings and incorporate physiological measures within an assessment battery.

  20. Demonstrating and Deploying Private Sector Technologies at DOE Sites - Issues to be Overcome

    International Nuclear Information System (INIS)

    Bedick, R. C.

    2002-01-01

    The Department of Energy (DOE), Office of Environmental Management (EM) continues to pursue cost-effective, environmental cleanup of the weapons complex sites with a concomitant emphasis on deployment of innovative technologies as a means to this end. The EM Office of Science and Technology (OST) pursues a strategy that entails identification of technologies that have potential applications throughout the DOE complex: at multiple DOE sites and at multiple facilities on those sites. It further encourages a competitive procurement process for the various applications entailed in the remediation of a given facility. These strategies require a competitive private-sector supplier base to help meet EM needs. OST supports technology development and deployment through investments in partnerships with private industry to enhance the acceptance of their technology products within the DOE market. Since 1992, OST and the National Energy Technology Laboratory (NETL) have supported the re search and development of technology products and services offered by the private sector. During this time, NETL has managed over 140 research and development projects involving industrial and university partners. These projects involve research in a broad range of EM related topics, including deactivation and decommissioning, characterization, monitoring, sensors, waste separation, groundwater remediation, robotics, and mixed waste treatment. Successful partnerships between DOE and Industry have resulted in viable options for EM's cleanup needs, and require continued marketing efforts to ensure that these technology solutions are used at multiple DOE sites and facilities

  1. Supporting deployed operations: are military nurses gaining the relevant experience from MDHUs to be competent in deployed operations?

    Science.gov (United States)

    Beaumont, Steven P; Allan, Helen T

    2014-01-01

    To explore how peacetime employment of military nurses in the UK National Health Service Medical Defence Hospital Units prepares them to be competent to practise in their role on deployment. Military secondary care nurses are employed within UK National Health Service Trusts to gain clinical experience that will be relevant to their military nursing role. A two-stage grounded theory study using mixed methods: postal questionnaire survey and in-depth interviews. In stage one a postal questionnaire was distributed to all serving military nurses. Stage two involved 12 semi-structured interviews. The data from both parts of the study were analysed using grounded theory. Four categories and one core category were identified, which suggested that participants did not feel fully prepared for deployment. Their feelings of preparedness increased with deployment experience and decreased when the nature of injuries seen on deployment changed. Respondents argued that even when unprepared, they did not feel incompetent. The findings suggest that the peacetime clinical experience gained in the National Health Service did not always develop the necessary competencies to carry out roles as military nurses on deployment. This study highlights the unique role of military nurses. We discuss these findings in the light of the literature on competency and expertise. The military nurses in this study did not feel fully prepared for deployed operations. We propose a new model for how military nurses could gain relevant experience from their National Health Service placements. National Health Service clinical placements need to be reassessed regularly to ensure that they are meeting military nurses' clinical requirements. Experiences of nurses returning from deployment could be shared and used as a basis for reflection and learning within National Health Service Trusts and also inform decisions regarding the appropriateness of clinical placements for qualified military nurses. © 2012

  2. The Manhattan Project: An Overview

    Science.gov (United States)

    Reed, Cameron

    2017-01-01

    August 2017 will mark the 75th anniversary of the establishment of the United States Army's Manhattan Engineer District, which oversaw the development and deployment of the first generation of nuclear weapons during World War II. In this talk I give an overview of the Manhattan Project, touching on its historical context, genesis, organization, facilities, accomplishments, challenges encountered, and legacies. I will also comment briefly on some of its lesser-known aspects and the persistent popular mythologies that still surround it.

  3. Library Website Usability Test Project

    KAUST Repository

    Ramli, Rindra M.; Bukhari, Duaa

    2013-01-01

    This usability testing project was conducted to elicit an understanding of our community use of the library website. The researchers wanted to know how our users are interacting with the library website and the ease of obtaining relevant information from the website. The methodology deployed was computer user testing where participants are made to answer several questions and executing the actions on the library website. Their actions are recorded via Techsmith Camtasia software for later analysis by the researchers.

  4. Library Website Usability Test Project

    KAUST Repository

    Ramli, Rindra M.

    2013-06-01

    This usability testing project was conducted to elicit an understanding of our community use of the library website. The researchers wanted to know how our users are interacting with the library website and the ease of obtaining relevant information from the website. The methodology deployed was computer user testing where participants are made to answer several questions and executing the actions on the library website. Their actions are recorded via Techsmith Camtasia software for later analysis by the researchers.

  5. Project Notes

    Science.gov (United States)

    School Science Review, 1978

    1978-01-01

    Presents sixteen project notes developed by pupils of Chipping Norton School and Bristol Grammar School, in the United Kingdom. These Projects include eight biology A-level projects and eight Chemistry A-level projects. (HM)

  6. The Risk Management in New Technology Deployment to Nuclear Power Plant

    International Nuclear Information System (INIS)

    Jung, Kil Young; Roh, Myung Sub

    2013-01-01

    This paper figures out that it is required to build the structured and integrated risk management system in enterprise level. By means of it, the accumulated data and experience of work can be shared and transferred effectively among workers, and consequently design mistake or error can be reduced. It has been requested to upgrade and replace equipment in Nuclear Power Plant (NPP) with new technology because of obsolescence and spare parts issues, and demands for higher performance. The processes for the new technology deployment to NPP, however, may have risks causing the unpredictable outcomes leading to the degradation of performance or operation. Therefore, the proper risk management is essential for ensuring safety and performance of NPP since it provides means to identify risks and minimizing their impacts. For these reason, this paper aims at investigating how the risk is managed and presents the proper risk management in project for the deployment of new technology to NPP. This paper investigated how the risk is managed in the NPP industry. Risk is perceived as a negative term that brings negative impact on project objectives. 10 key risks are identified and classified as high risk on cost, time, scope, or quality in compliance with the criteria seeking 'Safety First'. Design mistake or error' can significantly influence three project objectives while the rest risks can significantly influence one or two project objectives. However, it is also found that there are neither structured ways nor a systematical approach to perform the proper risk management. As a result, risk management such as identification, assessment, and response is mostly performed in the individual level laying much weight on experience since the most common methods are past experience and review of similar case

  7. The Risk Management in New Technology Deployment to Nuclear Power Plant

    Energy Technology Data Exchange (ETDEWEB)

    Jung, Kil Young; Roh, Myung Sub [KEPCO International Nuclear Graduate School, Ulsan (Korea, Republic of)

    2013-10-15

    This paper figures out that it is required to build the structured and integrated risk management system in enterprise level. By means of it, the accumulated data and experience of work can be shared and transferred effectively among workers, and consequently design mistake or error can be reduced. It has been requested to upgrade and replace equipment in Nuclear Power Plant (NPP) with new technology because of obsolescence and spare parts issues, and demands for higher performance. The processes for the new technology deployment to NPP, however, may have risks causing the unpredictable outcomes leading to the degradation of performance or operation. Therefore, the proper risk management is essential for ensuring safety and performance of NPP since it provides means to identify risks and minimizing their impacts. For these reason, this paper aims at investigating how the risk is managed and presents the proper risk management in project for the deployment of new technology to NPP. This paper investigated how the risk is managed in the NPP industry. Risk is perceived as a negative term that brings negative impact on project objectives. 10 key risks are identified and classified as high risk on cost, time, scope, or quality in compliance with the criteria seeking 'Safety First'. Design mistake or error' can significantly influence three project objectives while the rest risks can significantly influence one or two project objectives. However, it is also found that there are neither structured ways nor a systematical approach to perform the proper risk management. As a result, risk management such as identification, assessment, and response is mostly performed in the individual level laying much weight on experience since the most common methods are past experience and review of similar case.

  8. Quality function deployment in healthcare: a literature review and case study.

    Science.gov (United States)

    Gremyr, Ida; Raharjo, Hendry

    2013-01-01

    This article aims to provide a literature review on the use of quality function deployment (QFD) in healthcare and a case study in order to provide contextual knowledge as a means of improving applications of QFD in healthcare. The literature search was done via Google Scholar, PubMed/MEDLINE, and Web of Science using the keywords "quality function deployment" and "healthcare"; focusing on journal publications and their related citations. The case study was done within a design for Six Sigma project (DFSS) in a Swedish hospital. Empirical data were collected through face-to-face interviews and project documentation. Four potentials (better understanding of customers' needs and wants, identification of opportunities for process improvement, effective system thinking approach, and better communication and more transparent process) and three antecedents (understanding the customer, understanding the customer's needs, and finding ways to prioritize and translate those needs) of QFD application in healthcare were identified from the literature review. From the case study, the application of QFD leads to an increased awareness of a complex multiple-customer concept, traceability of the improvement strategies in a more structured way, and the formation of a new process organization. A time study at one clinic (cardiology) before and after the project within which the QFD was used showed that the time spent on prescription of medication has decreased by more than 20 percent. This has increased the time that doctors can spend with their patients. This paper highlights the potentials and antecedents of applying QFD in healthcare from previous research. Furthermore, the practical findings obtained from applying QFD in the project can also provide some useful insights for practitioners. The novel contribution is two-fold. First, it is the identification of the potentials and antecedents of using QFD in healthcare context. Second, it is the findings and learning from a

  9. Deployment of SIP in MANET: challenges and circumvention

    Directory of Open Access Journals (Sweden)

    Abdelhamid Salma R.

    2017-01-01

    Full Text Available The immense growth in wireless network applications has encouraged the researchers to enhance and propose new approaches that facilitate the deployment of the widely used services, protocols, and applications of the wired networking area in the wireless networks. Among which, the Session Initiation Protocol (SIP is a signaling protocol that allows the establishment of multimedia sessions and calls between different parties. SIP functionality totally depends on a centralized infrastructure, and complexity arises when deploying such a protocol in a special type of wireless networks, namely Mobile Ad-hoc Networks (MANET, due to the absence of a centralized infrastructure, and the dynamic topology of the later. This paper highlights the the challenges arising when deploying SIP in MANETs and presents an overview of different proposed approaches to overcome these challenges.

  10. Optimal and Approximate Approaches for Deployment of Heterogeneous Sensing Devices

    Directory of Open Access Journals (Sweden)

    Rabie Ramadan

    2007-04-01

    Full Text Available A modeling framework for the problem of deploying a set of heterogeneous sensors in a field with time-varying differential surveillance requirements is presented. The problem is formulated as mixed integer mathematical program with the objective to maximize coverage of a given field. Two metaheuristics are used to solve this problem. The first heuristic adopts a genetic algorithm (GA approach while the second heuristic implements a simulated annealing (SA algorithm. A set of experiments is used to illustrate the capabilities of the developed models and to compare their performance. The experiments investigate the effect of parameters related to the size of the sensor deployment problem including number of deployed sensors, size of the monitored field, and length of the monitoring horizon. They also examine several endogenous parameters related to the developed GA and SA algorithms.

  11. Vibration characteristics of a deployable controllable-geometry truss boom

    Science.gov (United States)

    Dorsey, J. T.

    1983-01-01

    An analytical study was made to evaluate changes in the fundamental frequency of a two dimensional cantilevered truss boom at various stages of deployment. The truss could be axially deployed or retracted and undergo a variety of controlled geometry changes by shortening or lengthening the telescoping diagonal members in each bay. Both untapered and tapered versions of the truss boom were modeled and analyzed by using the finite element method. Large reductions in fundamental frequency occurred for both the untapered and tapered trusses when they were uniformly retracted or maneuvered laterally from their fully deployed position. These frequency reductions can be minimized, however, if truss geometries are selected which maintain cantilever root stiffness during truss maneuvers.

  12. Security-by-Experiment: Lessons from Responsible Deployment in Cyberspace.

    Science.gov (United States)

    Pieters, Wolter; Hadžiosmanović, Dina; Dechesne, Francien

    2016-06-01

    Conceiving new technologies as social experiments is a means to discuss responsible deployment of technologies that may have unknown and potentially harmful side-effects. Thus far, the uncertain outcomes addressed in the paradigm of new technologies as social experiments have been mostly safety-related, meaning that potential harm is caused by the design plus accidental events in the environment. In some domains, such as cyberspace, adversarial agents (attackers) may be at least as important when it comes to undesirable effects of deployed technologies. In such cases, conditions for responsible experimentation may need to be implemented differently, as attackers behave strategically rather than probabilistically. In this contribution, we outline how adversarial aspects are already taken into account in technology deployment in the field of cyber security, and what the paradigm of new technologies as social experiments can learn from this. In particular, we show the importance of adversarial roles in social experiments with new technologies.

  13. Improvements for rotary viscous dampers used in spacecraft deployment mechanisms

    Science.gov (United States)

    Stewart, Alphonso; Powers, Charles; Lyons, Ron

    1998-01-01

    During component level thermal-vacuum deployment testing of eight rotary viscous dampers for the Tropical Rainfall Measuring Mission (TRMM) satellite, all the dampers failed to provide damping during a region of the deployment. Radiographic examination showed that air in the damping fluid caused the undamped motion when the dampers were operated in a vacuum environment. Improvements in the procedure used to fill the dampers with damping fluid, the installation of a Viton vacuum seal in the damper cover, and improved screening techniques eliminated the problem.

  14. Hezbollah Rockets and Missiles: Deployment and Defence Programme

    Directory of Open Access Journals (Sweden)

    Ladislav Kulhánek

    2018-01-01

    Full Text Available The paper addresses the issue of the proliferation of the rocket technology deployed in guerrilla warfare throughout the Near East. It evaluates assumptions and identifies potential regressions with respect to the most recent hot phase in the violent conflict between Hezbollah and Israel, with a focus on primary methods based on rocket shelling and resistance efforts. In comparing the two military forces, Israel emerges as the stronger, even if artillery and tactical ballistic missiles with warheads containing substances defined as weapons of mass destruction were to be deployed as an extreme first measure by Hezbollah, in which case an Israeli or American response would destroy at least parts of Lebanon.

  15. Base Station Antenna Pattern Distortion in Practical Urban Deployment Scenarios

    DEFF Research Database (Denmark)

    Rodriguez Larrad, Ignacio; Nguyen, Huan Cong; Sørensen, Troels Bundgaard

    2014-01-01

    In real urban deployments, base station antennas are typically not placed in free space conditions. Therefore, the radiation pattern can be affected by mounting structures and nearby obstacles located in the proximity of the antenna (near-field), which are often not taken into consideration. Also...... presents a combination of near-field and far-field simulations aimed to provide an overview of the distortion experienced by the base station antenna pattern in two different urban deployment scenarios: rooftop and telecommunications tower. The study illustrates how, in comparison with the near...

  16. Deployment and Implementation Strategies for Massive MIMO in 5G

    DEFF Research Database (Denmark)

    Panzner, Berthold; Zirwas, Wolfgang; Dierks, Stefan

    2015-01-01

    for 5G is a successful and cost-efficient integration in the overall network concept. This work highlights deployment and implementation strategies for massive MIMO in the context of 5G indoor small cell scenarios. Different massive MIMO deployment scenarios are analyzed for a standard 3GPP indoor...... to spatial streams is varied stepwise from equality to a factor of ten. For implementation of massive MIMO in 5G networks trends in beamforming techniques, mutually coupled subarrays, over the calibration procedure and estimated ADC performance in 2020 time-frame are discussed. Based on the debate the paper...

  17. Market deployment strategies for photovoltaics: an international review

    International Nuclear Information System (INIS)

    Haas, R.

    2003-01-01

    In the last decade of the 20th century a wide variety of deployment strategies and dissemination programmes for grid-connected PV systems in the built environment has been launched by quite different organizations and institutions. Governmental bodies on national and local levels have launched strategies, as have electric utilities and NGOs. The core objective of this paper is to document and evaluate the most important past and current market deployment strategies for the broader dissemination of grid-connected PV systems in the built environment. (author)

  18. Intelligent quality function deployment system in concurrent engineering environment

    Science.gov (United States)

    Lin, Zhihang; Che, Ada

    1998-10-01

    This paper describes work being undertaken in the development of an intelligent distributed quality function deployment (IDQFD) system, which supports product design team to transfer and deployment the `Voice of Customer' through `House of Quality' into the various stages of product planning, engineering and manufacturing. The requirement modeling of products, the optimization in QFD are indicated. The framework of the system, including QFD tools and platform for distributed collaborative work in QFD, is described. The strategy and methods for the collaboration processing in QFD process are presented. It shows promise for application in practice.

  19. Cognitive ability and risk of post-traumatic stress disorder after military deployment

    DEFF Research Database (Denmark)

    Nissen, Lars R.; Karstoft, Karen-Inge; Vedtofte, Mia S.

    2017-01-01

    Background: Studies of the association between pre-deployment cognitive ability and post-deployment post-traumatic stress disorder (PTSD) have shown mixed results. Aims: To study the influence of pre-deployment cognitive ability on PTSD symptoms 6-8 months post-deployment in a large population...

  20. 49 CFR 268.3 - Different phases of the Maglev Deployment Program.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Different phases of the Maglev Deployment Program... DEPLOYMENT PROGRAM Overview § 268.3 Different phases of the Maglev Deployment Program. (a) The Maglev... deadlines—based on the progress of the Maglev Deployment Program; grantees will be notified accordingly. (b...

  1. 49 CFR 268.5 - Federal funding sources for the Maglev Deployment Program.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Federal funding sources for the Maglev Deployment... TECHNOLOGY DEPLOYMENT PROGRAM Overview § 268.5 Federal funding sources for the Maglev Deployment Program. (a) Federal Maglev Funds. Section 322 of Title 23 provides for the following funds for the Maglev Deployment...

  2. Deployment of Mobile Learning Course Materials to Android Powered Mobile Devices

    Science.gov (United States)

    Chao, Lee

    2012-01-01

    The objective of this article is to facilitate mobile teaching and learning by providing an alternative course material deployment method. This article suggests a course material deployment platform for small universities or individual instructors. Different from traditional course material deployment methods, the method discussed deploys course…

  3. 15 CFR 270.102 - Conditions for establishment and deployment of a Team.

    Science.gov (United States)

    2010-01-01

    ... deployment of a Team. 270.102 Section 270.102 Commerce and Foreign Trade Regulations Relating to Commerce and... SAFETY TEAMS NATIONAL CONSTRUCTION SAFETY TEAMS Establishment and Deployment of Teams § 270.102 Conditions for establishment and deployment of a Team. (a) The Director may establish a Team for deployment...

  4. The ARCHER Project

    International Nuclear Information System (INIS)

    Knol, S.; Roelofs, F.; Fütterer, M.A.; Kohtz, N.; Laurie, M.; Buckthorpe, D.; Scheuermann, W.

    2014-01-01

    The European HTR R&D project ARCHER (Advanced High-Temperature Reactors for Cogeneration of Heat and Electricity R&D) builds on a solid HTR technology foundation in Europe, established through former national UK and German HTR programs and in European programs. ARCHER runs from 2011 to 2015 and targets selected HTR R&D subjects that would specifically support demonstration, with a focus on experimental effort. In line with the R&D and deployment strategy of the European Sustainable Nuclear Energy Technology Platform (SNETP) ARCHER contributes to maintaining, strengthening and expanding the HTR knowledge base in Europe to lay the foundations for demonstration of nuclear cogeneration with HTR systems. The project consortium encompasses conventional and nuclear industry, utilities, Technical Support Organizations, R&D organizations and academia. ARCHER shares results with international partners in the Generation IV International Forum and collaborates directly with related projects in the US, China, Japan, the Republic of Korea and South Africa. The ARCHER project is in its final year, and the paper comprises an overview of the achievements thus far for the different Sub Projects. (author)

  5. FUNCTIONS AND REQUIREMENTS FOR RUSSIAN PULSATING MONITOR DEPLOYMENT IN THE GUNITE AND ASSOCIATED TANKS AT OAK RIDGE NATIONAL LABORATORY

    International Nuclear Information System (INIS)

    Thomas Albert

    1999-01-01

    This document provides functions and requirements to support deployment of pulsating mixer pump technology in the Oak Ridge National Laboratory (ORNL) Gunite and Associated Tanks to mobilize and mix the settled sludge and solids in these tanks. In FY 1998 pulsating mixer pump technology, a jet mixer powered by a reciprocating air supply, was selected for FY 1999 deployment in one of the GAAT tanks to mobilize settled solids. Pulsating mixer pump technology was identified in FY 1996 during technical exchanges between the US Department of Energy (DOE) Tanks Focus Area Retrieval and Closure program, the DOE Environmental Management International Programs, and delegates from Russia as a promising technology that could be implemented in the US. The pulsating mixer pump technology, provided by the Russian Integrated Mining Chemical Company, was tested at Pacific Northwest National Laboratory (PNNL) to observe its ability to mobilize settled solids. Based on the results of this demonstration, ORNL and DOE staff determined that a modified pulsating mixer pump would meet project needs for bulk mobilization of Gunite tank sludge prior to deployment of other retrieval systems. The deployment of this device is expected to significantly reduce the costs of operation and maintenance of more expensive retrieval systems. The functions and requirements presented here were developed by evaluating the results and recommendations that resulted from the pulsating mixer pump demonstration at PNNL, and by coupling this with the remediation needs identified by staff at ORNL involved with the remediation of the Gunite and Associated Tanks

  6. Development of effect assessment methodology for the deployment of fast reactor cycle system with dynamic computable general equilibrium model

    International Nuclear Information System (INIS)

    Shiotani, Hiroki; Ono, Kiyoshi

    2009-01-01

    The Global Trade and Analysis Project (GTAP) is a widely used computable general equilibrium (CGE) model developed by Purdue University. Although the GTAP-E, an energy environmental version of the GTAP model, is useful for surveying the energy-economy-environment-trade linkage is economic policy analysis, it does not have the decomposed model of the electricity sector and its analyses are comparatively static. In this study, a recursive dynamic CGE model with a detailed electricity technology bundle with nuclear power generation including FR was developed based on the GTAP-E to evaluate the long-term socioeconomic effects of FR deployment. The capital stock changes caused by international investments and some dynamic constraints of the FR deployment and operation (e.g., load following capability and plutonium mass balance) were incorporated in the analyses. The long-term socioeconomic effects resulting from the deployment of economic competitive FR with innovative technologies can be assessed; the cumulative effects of the FR deployment on GDP calculated using this model costed over 40 trillion yen in Japan and 400 trillion yen worldwide, which were several times more than the cost of the effects calculated using the conventional cost-benefit analysis tool, because of ripple effects and energy substitutions among others. (author)

  7. Reactor Technology Options Study for Near-Term Deployment of GNEP Grid-Appropriate Reactors

    Energy Technology Data Exchange (ETDEWEB)

    Ingersoll, Daniel T [ORNL; Poore III, Willis P [ORNL

    2007-09-01

    World energy demand is projected to significantly increase over the coming decades. The International Energy Agency projects that electricity demand will increase 50% by 2015 and double by 2030, with most of the increase coming in developing countries as they experience double-digit rates of economic growth and seek to improve their standards of living. Energy is the necessary driver for human development, and the demand for energy in these countries will be met using whatever production technologies are available. Recognizing this inevitable energy demand and its implications for the United States, the U.S. National Security Strategy has proposed the Global Nuclear Energy Partnership (GNEP) to work with other nations to develop and deploy advanced nuclear recycling and reactor technologies. This initiative will help provide reliable, emission-free energy with less of the waste burden of older technologies and without making available separated plutonium that could be used by rogue states or terrorists for nuclear weapons. These new technologies will make possible a dramatic expansion of safe, clean nuclear energy to help meet the growing global energy demand. In other words, GNEP seeks to create an international regime to support large-scale growth in the worldwide use of nuclear energy without increasing the risk of nuclear weapon proliferation. This global expansion of nuclear power is strategically important to the United States for several reasons, including the following: (1) National security, by reducing the competition and potential for conflict over increasingly scarce fossil energy resources; (2) Economic security, by helping maintain stable prices for nonrenewable resources such as oil, gas, and coal; (3) Environmental security, by replacing or off-setting large-scale burning of greenhouse gas-emitting fuels for electricity production; and (4) Regaining technical leadership, through deployment of innovative U.S. technology-based reactors. Fully meeting

  8. Reactor Technology Options Study for Near-Term Deployment of GNEP Grid-Appropriate Reactors

    International Nuclear Information System (INIS)

    Ingersoll, Daniel T.; Poore, Willis P. III

    2007-01-01

    World energy demand is projected to significantly increase over the coming decades. The International Energy Agency projects that electricity demand will increase 50% by 2015 and double by 2030, with most of the increase coming in developing countries as they experience double-digit rates of economic growth and seek to improve their standards of living. Energy is the necessary driver for human development, and the demand for energy in these countries will be met using whatever production technologies are available. Recognizing this inevitable energy demand and its implications for the United States, the U.S. National Security Strategy has proposed the Global Nuclear Energy Partnership (GNEP) to work with other nations to develop and deploy advanced nuclear recycling and reactor technologies. This initiative will help provide reliable, emission-free energy with less of the waste burden of older technologies and without making available separated plutonium that could be used by rogue states or terrorists for nuclear weapons. These new technologies will make possible a dramatic expansion of safe, clean nuclear energy to help meet the growing global energy demand. In other words, GNEP seeks to create an international regime to support large-scale growth in the worldwide use of nuclear energy without increasing the risk of nuclear weapon proliferation. This global expansion of nuclear power is strategically important to the United States for several reasons, including the following: (1) National security, by reducing the competition and potential for conflict over increasingly scarce fossil energy resources; (2) Economic security, by helping maintain stable prices for nonrenewable resources such as oil, gas, and coal; (3) Environmental security, by replacing or off-setting large-scale burning of greenhouse gas-emitting fuels for electricity production; and (4) Regaining technical leadership, through deployment of innovative U.S. technology-based reactors. Fully meeting

  9. Smart Grid Demonstration Project

    Energy Technology Data Exchange (ETDEWEB)

    Miller, Craig [National Rural Electric Cooperative Association, Arlington, VA (United States); Carroll, Paul [National Rural Electric Cooperative Association, Arlington, VA (United States); Bell, Abigail [National Rural Electric Cooperative Association, Arlington, VA (United States)

    2015-03-11

    The National Rural Electric Cooperative Association (NRECA) organized the NRECA-U.S. Department of Energy (DOE) Smart Grid Demonstration Project (DE-OE0000222) to install and study a broad range of advanced smart grid technologies in a demonstration that spanned 23 electric cooperatives in 12 states. More than 205,444 pieces of electronic equipment and more than 100,000 minor items (bracket, labels, mounting hardware, fiber optic cable, etc.) were installed to upgrade and enhance the efficiency, reliability, and resiliency of the power networks at the participating co-ops. The objective of this project was to build a path for other electric utilities, and particularly electrical cooperatives, to adopt emerging smart grid technology when it can improve utility operations, thus advancing the co-ops’ familiarity and comfort with such technology. Specifically, the project executed multiple subprojects employing a range of emerging smart grid technologies to test their cost-effectiveness and, where the technology demonstrated value, provided case studies that will enable other electric utilities—particularly electric cooperatives— to use these technologies. NRECA structured the project according to the following three areas: Demonstration of smart grid technology; Advancement of standards to enable the interoperability of components; and Improvement of grid cyber security. We termed these three areas Technology Deployment Study, Interoperability, and Cyber Security. Although the deployment of technology and studying the demonstration projects at coops accounted for the largest portion of the project budget by far, we see our accomplishments in each of the areas as critical to advancing the smart grid. All project deliverables have been published. Technology Deployment Study: The deliverable was a set of 11 single-topic technical reports in areas related to the listed technologies. Each of these reports has already been submitted to DOE, distributed to co-ops, and

  10. An Action Design Research on development and deployment of a computer-based group discussion support tool for achieving consensus and culture change at an educational institution

    NARCIS (Netherlands)

    Lee Mui Suan, Jaclyn; van Hillegersberg, Jos; Kumar, Kuldeep

    2015-01-01

    Organisational culture change is a long and complex process that typically takes years to complete and has a very low success rate. This project addresses the problem by the proposed use of an Action Design Research Methodology to build and deploy an IT artifact named Organisational Culture

  11. Optimization of Hydroacoustic Equipment Deployment at Foster Dam, 2013

    Energy Technology Data Exchange (ETDEWEB)

    Hughes, James S.; Johnson, Gary E.; Ploskey, Gene R.; Hennen, Matthew J.; Fischer, Eric S.; Zimmerman, Shon A.

    2013-03-01

    The goal of the study was to optimize performance of the fixed-location hydroacoustic systems at Foster Dam (FOS) by determining deployment and data acquisition methods that minimized structural, electrical, and acoustic interference. Optimization of the hydroacoustic systems will establish methodology for sampling by active acoustic methods during this year-long evaluation of juvenile salmonid passage at FOS.

  12. Supporting Children Facing the Deployment of a Parent

    Science.gov (United States)

    Rahill, Stephanie

    2013-01-01

    As the cycle of deployments to war zones by military service members and other federal government employees continue, school psychologists likely have encountered or will encounter children in their schools who have been dealing with an absence of a parent for extended periods of time. While some school psychologists who live and work near major…

  13. Real-life C-RAN deployment considerations

    DEFF Research Database (Denmark)

    Hansen, Line Maria Pyndt; Ruepp, Sarah Renée; Christiansen, Henrik Lehrmann

    2017-01-01

    procedures and best practices for roll out are yet to be established. This work provides a case study, where a small but densely populated part of the network owned by the Danish mobile network operator, TDC, is evaluated for C-RAN deployment. A roadmap is provided which uses traffic data as input...

  14. Spacecraft on-orbit deployment anomalies - What can be done?

    Science.gov (United States)

    Freeman, Michael T.

    1993-04-01

    Modern communications satellites rely heavily upon deployable appendage (i.e. solar arrays, communications antennas, etc.) to perform vital functions that enable the spacecraft to effectively conduct mission objectives. Communications and telemetry antennas provide the radiofrequency link between the spacecraft and the earth ground station, permitting data to be transmitted and received from the satellite. Solar arrays serve as the principle source of electrical energy to the satellite, and recharge internal batteries during operation. However, since satellites cannot carry backup systems, if a solar array fails to deploy, the mission is lost. This article examines the subject of on-orbit anomalies related to the deployment of spacecraft appendage, and possible causes of such failures. Topics discussed shall include mechanical launch loading, on-orbit thermal and solar concerns, reliability of spacecraft pyrotechnics, and practical limitations of ground-based deployment testing. Of particular significance, the article will feature an in-depth look at the lessons learned from the successful recovery of the Telesat Canada Anik-E2 satellite in 1991.

  15. Modeling deployment of Pierce’s disease resistant grapevines

    Science.gov (United States)

    Deployment of Pierce’s disease resistant grapevines is a key solution to mitigating economic losses caused by Xylella fastidiosa. While Pierce’s disease resistant grapevines under development display mild symptoms and have lower bacterial populations than susceptible varieties, all appear to remain ...

  16. Deployment of Wireless Sensor Networks in Crop Storages

    DEFF Research Database (Denmark)

    Juul, Jakob Pilegaard; Green, Ole; Jacobsen, Rune Hylsberg

    2015-01-01

    of a wireless sensor network based system that provides continuous, automatic, and up-to-date information on a crop storage, while presenting the data in an easily accessible manner, is also described. The design decisions, challenges, and practical experiences from real-world large scale deployment...

  17. Beyond Continuous Delivery: An Empirical Investigation of Continuous Deployment Challenges

    DEFF Research Database (Denmark)

    Shahin, Mojtaba; Ali Babar, Muhammad; Zahedi, Mansooreh

    2017-01-01

    Context: A growing number of software organizations have been adopting Continuous DElivery (CDE) and Continuous Deployment (CD) practices. Researchers have started investing significant efforts in studying different aspects of CDE and CD. Many studies refer to CDE (i.e., where an application is p...

  18. Determining the Optimal C-130 Deployed Crew Ratio

    Science.gov (United States)

    2014-06-13

    components. The active component operates at a 1:2 (with a goal of 1:3) deploy-to- dwell while the ARC plans a 1:5 ( Stenner , 2011, pp. 5, 10). This...Rand Corporation, 2011. Rand Corporation. Intratheater Airlift Functional Solution Analysis. Santa Monica: Rand Corporation, 2011. Stenner

  19. Structural realism versus deployment realism: A comparative evaluation.

    Science.gov (United States)

    Lyons, Timothy D

    2016-10-01

    In this paper I challenge and adjudicate between the two positions that have come to prominence in the scientific realism debate: deployment realism and structural realism. I discuss a set of cases from the history of celestial mechanics, including some of the most important successes in the history of science. To the surprise of the deployment realist, these are novel predictive successes toward which theoretical constituents that are now seen to be patently false were genuinely deployed. Exploring the implications for structural realism, I show that the need to accommodate these cases forces our notion of "structure" toward a dramatic depletion of logical content, threatening to render it explanatorily vacuous: the better structuralism fares against these historical examples, in terms of retention, the worse it fares in content and explanatory strength. I conclude by considering recent restrictions that serve to make "structure" more specific. I show however that these refinements will not suffice: the better structuralism fares in specificity and explanatory strength, the worse it fares against history. In light of these case studies, both deployment realism and structural realism are significantly threatened by the very historical challenge they were introduced to answer. Copyright © 2016 Elsevier Ltd. All rights reserved.

  20. Municipal Real Estate deployed as a capital asset

    NARCIS (Netherlands)

    Appel - Meulenbroek, H.A.J.A.; Maussen, S.J.E.; de Bis, N.; Verkerk, B.G.

    2004-01-01

    Abstract The aim of this study is to introduce the principles of Corporate Real Estate Management (CREM) within the municipal organization. It is presumed that, looking at the private sector’s accomplishments in this field, these principles will allow a city council to deploy their real estate in a

  1. Abstraction Layer For Development And Deployment Of Cloud Services

    Directory of Open Access Journals (Sweden)

    Binh Minh Nguyen

    2012-01-01

    Full Text Available In this paper, we will present an abstraction layer for cloud computing, which intends to simplify the manipulation with virtual machines in clouds for easy and controlled development and deployment of cloud services. It also ensures interoperability between different cloud infrastructures and allows developers to create cloud appliances easily via inheritance mechanisms.

  2. IPV6 Deployment - Mauritius to benefit from Opportunities and World ...

    African Journals Online (AJOL)

    user1

    gaming, and many other new applications cost even higher to be deployed on IPv4 ... mitigate the effects of the imminent depletion of the IPv4 address space and .... The government of Korea plans to achieve complete IPv6 transition in the.

  3. Design of a deployment rotation mechanism for microsatellite

    NARCIS (Netherlands)

    Abdelal, G.F.; Bakr Elhady, A.; Kassab, M.

    2009-01-01

    Solar array rotation mechanism provides a hinged joint between the solar panel and satellite body, smooth rotation of the solar array into deployed position and its fixation in this position. After unlocking of solar panel (while in orbit), rotation bracket turns towards ready-to-work position under

  4. Novel Deployment Mechanism for Conventional Solar Array Enhancement

    Directory of Open Access Journals (Sweden)

    Hodgetts Paul A.

    2017-01-01

    Full Text Available A novel mechanism is described, by which flexible blankets could be deployed from existing solar panel designs. These blankets could be covered with flexible cells, or they could be reflective films to form a concentrator array. Either way, the performance of an existing array design could be enhanced.

  5. Facilitating ICN deployment with an extended open flow protocol

    NARCIS (Netherlands)

    Zuraniewski, P.W.; Adrichem, N.L.M. van; Ravesteijn, D.; IJntema, W.; Papadopoulos, C.; Fan, C.

    2017-01-01

    Named-Data Networking (NDN) is proposed as an approach to evolve the Internet infrastructure from a host- to an informationcentric (ICN) approach, which is better suited to the current usage of the Internet. However, the deployment of a global NDN-based Internet is still a long way out of reach. The

  6. A review of Lean Six Sigma deployment and maturity models

    NARCIS (Netherlands)

    Lameijer, B.A.; de Mast, J.; Does, R.J.M.M.

    2017-01-01

    For guidance in implementing Lean Six Sigma (LSS), both the academic and the practitioners’ literature offer deployment models and models for assessing the implementation’s maturity. This paper makes a critical appraisal of the quality and usefulness of a sample of 19 such models. The appraisal

  7. Quality function deployment in the food industry: a review

    NARCIS (Netherlands)

    Costa, A.I.A.; Dekker, M.; Jongen, W.M.F.

    2001-01-01

    This paper presents a detailed literature review on the topic of the application of quality function deployment (QFD) in the food industry. This review is extended with a thorough description of the methodologies involved in the practice of QFD within food companies, exemplified with the help of a

  8. The Effects of Multiple Deployments on Army Adolescents

    Science.gov (United States)

    2010-01-01

    deployment-related feelings.12 Focusing on a parent’s absence, dwelling on potential negative outcomes, or ruminating on problems often sends a child...maintain balance in the pull of both noble institutions. Some Army adolescents contend poorly in this dilemma; others—many more than soldiers or Army

  9. An early deployment strategy for carbon capture, utilisation, and storage

    Energy Technology Data Exchange (ETDEWEB)

    Carter, L.D.

    2012-11-01

    This report describes the current use of CO2 for EOR, and discusses potential expansion of EOR using CO2 from power plants. Analysis of potential EOR development in the USA, where most current CO2-based EOR production takes place, indicates that relatively low cost, traditional sources of CO2 for EOR (CO2 domes and CO2 from natural gas processing plants) are insufficient to exploit the full potential of EOR. To achieve that full potential will require use of CO2 from combustion and gasification systems, such as fossil fuel power plants, where capture of CO2 is more costly. The cost of current CCUS systems, even with the revenue stream for sale of the CO2 for EOR, is too high to result in broad deployment of the technology in the near term. In the longer term, research and development may be sufficient to reduce CO2 capture costs to a point where CCUS would be broadly deployed. This report describes a case study of conditions in the USA to explore a financial incentive to promote early deployment of CCUS, providing a range of immediate benefits to society, greater likelihood of reducing the long-term cost of CCUS, and greater likelihood of broad deployment of CCUS and CCS in the long term. Additionally, it may be possible to craft such an incentive in a manner that its cost is more than offset by taxes flowing from increased domestic oil production. An example of such an incentive is included in this report.

  10. Using Quality Function Deployment To Improve Academic Advising Processes.

    Science.gov (United States)

    Barrows, Richard; Murray, Bruce

    1997-01-01

    Quality Function Deployment, a set of concepts and tools used in manufacturing engineering to link consumer needs with product design, can also improve academic advising systems and processes. The technique promotes structured, logical examination of students' advising needs and their relationship to advising system design, processes, methods,…

  11. DEPLOYMENT OF VOIP ON WIRELINE NETWORK USING OPNET

    African Journals Online (AJOL)

    EKPAH

    study of VoIP traffic and other major devices. These results will ... pre-deployment analysis, planning and lack of ... given network under VoIP and data load traffic. OPNET contains a vast amount of models of .... There are a number of tools.

  12. Light Duty Utility Arm deployment in Tank WM-188

    International Nuclear Information System (INIS)

    Patterson, M.

    1999-01-01

    The Light Duty Utility Arm (LDUA) was successfully deployed in Tank WM-188 during February and March of 1999 at the Idaho Nuclear Technology and Engineering Center (INTEC) tank farm at the Idaho National Engineering and Environmental Laboratory. Some equipment problems were identified, but most were indicative of any first time activity. Deployment during cold weather imposed additional equipment risks, but in general, equipment response to the winter conditions was better than expected. Three end effectors were demonstrated during the deployment. All performed as expected, although the limited resolution of the Alternating Current Field Measurement end effector cannot absolutely confirm tank integrity, which is necessary for future tank inspections. Four heel samples were taken with the sampler end effector and a broad spectrum of analyses were performed. A detailed inspection of the tank interior was performed with the High Resolution Stereo Video System end effector. The sample information is proving invaluable to the development of new treatment flowsheets and waste forms. It is expected that the LDUA will be deployed for tank inspections through the next several years to support other Notice of Non-Compliance (NON) Consent Order requirements and several other ongoing initiatives

  13. Book Review: Deployment Psychology: Evidence-based strategies ...

    African Journals Online (AJOL)

    Book Review: Deployment Psychology: Evidence-based strategies to promote mental health in the Military. AB Adler, PD Bliese, CA Castro. Abstract. Washington, DC: American Psychological Association 2011 294 pages ISBN-13: 978-1-4338-0881-4. Full Text: EMAIL FREE FULL TEXT EMAIL FREE FULL TEXT

  14. Energy storage deployment and innovation for the clean energy transition

    Science.gov (United States)

    Kittner, Noah; Lill, Felix; Kammen, Daniel M.

    2017-09-01

    The clean energy transition requires a co-evolution of innovation, investment, and deployment strategies for emerging energy storage technologies. A deeply decarbonized energy system research platform needs materials science advances in battery technology to overcome the intermittency challenges of wind and solar electricity. Simultaneously, policies designed to build market growth and innovation in battery storage may complement cost reductions across a suite of clean energy technologies. Further integration of R&D and deployment of new storage technologies paves a clear route toward cost-effective low-carbon electricity. Here we analyse deployment and innovation using a two-factor model that integrates the value of investment in materials innovation and technology deployment over time from an empirical dataset covering battery storage technology. Complementary advances in battery storage are of utmost importance to decarbonization alongside improvements in renewable electricity sources. We find and chart a viable path to dispatchable US$1 W-1 solar with US$100 kWh-1 battery storage that enables combinations of solar, wind, and storage to compete directly with fossil-based electricity options.

  15. Deployment of vendor innovation capability in contract electronic manufacturing

    DEFF Research Database (Denmark)

    Perunovic, Zoran; Mefford, Robert N.

    2012-01-01

    This paper explores deployment of innovation capability in outsourcing from the vendor perspective. Vendor’s innovation-related competences are used to capture vendor innovativeness. A multiple-case study was applied with two Contract Electronic Manufacturers. Based on the data analysis we propose...

  16. Radiation technology in ground nut improvement and societal deployment

    International Nuclear Information System (INIS)

    Murty, G.S.S.; Badigannavar, A.M.; Kale, D.M.

    2004-01-01

    The best way to summarize the impact of mutation research in ground nut for societal deployment is for 1) developing suitable varieties for different agro-climatic zones in the country, 2) providing a source material for developing new varieties by other universities, 3) replacing traditional crops with TG varieties, 4) transforming socioeconomic status of peanut peasants and 5) enhanced ground nut productivity

  17. Deployment of Ahmadu Bello University Zaria, Nigeria Institutional ...

    African Journals Online (AJOL)

    Deployment of Ahmadu Bello University Zaria, Nigeria Institutional Digital Repository. ... that repositories are very important to universities in helping them showcase, manage and capture their intellectual assets as a part of their information service strategy and contribution to universal access to knowledge and information.

  18. Color impact in visual attention deployment considering emotional images

    Science.gov (United States)

    Chamaret, C.

    2012-03-01

    Color is a predominant factor in the human visual attention system. Even if it cannot be sufficient to the global or complete understanding of a scene, it may impact the visual attention deployment. We propose to study the color impact as well as the emotion aspect of pictures regarding the visual attention deployment. An eye-tracking campaign has been conducted involving twenty people watching half pictures of database in full color and the other half of database in grey color. The eye fixations of color and black and white images were highly correlated leading to the question of the integration of such cues in the design of visual attention model. Indeed, the prediction of two state-of-the-art computational models shows similar results for the two color categories. Similarly, the study of saccade amplitude and fixation duration versus time viewing did not bring any significant differences between the two mentioned categories. In addition, spatial coordinates of eye fixations reveal an interesting indicator for investigating the differences of visual attention deployment over time and fixation number. The second factor related to emotion categories shows evidences of emotional inter-categories differences between color and grey eye fixations for passive and positive emotion. The particular aspect associated to this category induces a specific behavior, rather based on high frequencies, where the color components influence the visual attention deployment.

  19. Light Duty Utility Arm deployment in Tank WM-188

    Energy Technology Data Exchange (ETDEWEB)

    Patterson, M.W.

    1999-12-01

    The Light Duty Utility Arm (LDUA) was successfully deployed in Tank WM-188 during February and March of 1999 at the Idaho Nuclear Technology and Engineering Center (INTEC) tank farm at the Idaho National Engineering and Environmental Laboratory. Some equipment problems were identified, but most were indicative of any first time activity. Deployment during cold weather imposed additional equipment risks, but in general, equipment response to the winter conditions was better than expected. Three end effectors were demonstrated during the deployment. All performed as expected, although the limited resolution of the Alternating Current Field Measurement end effector cannot absolutely confirm tank integrity, which is necessary for future tank inspections. Four heel samples were taken with the sampler end effector and a broad spectrum of analyses were performed. A detailed inspection of the tank interior was performed with the High Resolution Stereo Video System end effector. The sample information is proving invaluable to the development of new treatment flowsheets and waste forms. It is expected that the LDUA will be deployed for tank inspections through the next several years to support other Notice of Non-Compliance (NON) Consent Order requirements and several other ongoing initiatives.

  20. Light Duty Utility Arm Deployment in Tank WM-188

    Energy Technology Data Exchange (ETDEWEB)

    Patterson, Michael W

    2000-01-01

    The Light Duty Utility Arm (LDUA) was successfully deployed in Tank WM-188 during February and March of 1999 at the Idaho Nuclear Technology and Engineering Center (INTEC) tank farm at the Idaho National Engineering and Environmental Laboratory. Some equipment problems were identified, but most were indicative of any first time activity. Deployment during cold weather imposed additional equipment risks, but in general, equipment response to the winter conditions was better than expected. Three end effectors were demonstrated during the deployment. All performed as expected, although the limited resolution of the Alternating Current Field Measurement end effector cannot absolutely confirm tank integrity, which is necessary for future tank inspections. Four heel samples were taken with the sampler end effector and a broad spectrum of analyses were performed. A detailed inspection of the tank interior was performed with the High Resolution Stereo Video System end effector. The sample information is proving invaluable to the development of new treatment flowsheets and waste forms. It is expected that the LDUA will be deployed for tank inspections through the next several years to support other Notice of NonCompliance (NON) Consent Order requirements and several other ongoing initiatives.

  1. Modeling and analysis of a large deployable antenna structure

    Science.gov (United States)

    Chu, Zhengrong; Deng, Zongquan; Qi, Xiaozhi; Li, Bing

    2014-02-01

    One kind of large deployable antenna (LDA) structure is proposed by combining a number of basic deployable units in this paper. In order to avoid vibration caused by fast deployment speed of the mechanism, a braking system is used to control the spring-actuated system. Comparisons between the LDA structure and a similar structure used by the large deployable reflector (LDR) indicate that the former has potential for use in antennas with up to 30 m aperture due to its lighter weight. The LDA structure is designed to form a spherical surface found by the least square fitting method so that it can be symmetrical. In this case, the positions of the terminal points in the structure are determined by two principles. A method to calculate the cable network stretched on the LDA structure is developed, which combines the original force density method and the parabolic surface constraint. Genetic algorithm is applied to ensure that each cable reaches a desired tension, which avoids the non-convergence issue effectively. We find that the pattern for the front and rear cable net must be the same when finding the shape of the rear cable net, otherwise anticlastic surface would generate.

  2. Low Cost and Flexible UAV Deployment of Sensors

    DEFF Research Database (Denmark)

    Sørensen, Lars Yndal; Jacobsen, Lars Toft; Hansen, John Paulin

    2017-01-01

    -collection needs. The main contribution is the extensible architecture for modularized airborne sensor deployment and real-time data visualisation. Our open-source Android application provides data collection, flight path definition and map tools. Total cost of the system is below 800 dollars. The flexibility...

  3. Role of ENT Surgeon in Managing Battle Trauma During Deployment.

    Science.gov (United States)

    Rajguru, Renu

    2013-01-01

    With technological improvements in body armour and increasing use of improvised explosive devices, it is the injuries to head, face and neck are the cause for maximum fatalities as military personnel are surviving wounds that would have otherwise been fatal. The priorities of battlefield surgical treatment are to save life, eyesight and limbs and then to give the best functional and aesthetic outcome for other wounds. Modern day battlefields pose unique demands on the deployed surgical teams and management of head and neck wounds demands multispecialty approach. Optimal result will depend on teamwork of head and neck trauma management team, which should also include otolaryngologist. Data collected by various deployed HFN surgical teams is studied and quoted in the article to give factual figures. Otorhinolaryngology becomes a crucial sub-speciality in the care of the injured and military otorhinolaryngologists need to be trained and deployed accordingly. The otolaryngologist's clinical knowledge base and surgical domain allows the ENT surgeon to uniquely contribute in response to mass casualty incident. Military planners need to recognize the felt need and respond by deploying teams of specialist head and neck surgeons which should also include otorhinolaryngologists.

  4. The Deployment Life Study: Methodological Overview and Baseline Sample Description

    Science.gov (United States)

    2014-01-01

    previous conflicts over the past several decades (Belasco, 2007; Bruner , 2006; Serafino, 2003). Furthermore, deployed troops are surviving wounds at higher...Long-Term Contextual Threat,” Psychological Medicine, Vol. 15, No. 1, February 1985, pp. 189–194. Bruner , Edward F., Military Forces: What Is the

  5. Deployment of Recommender Systems: Operational and Strategic Issues

    Science.gov (United States)

    Ghoshal, Abhijeet

    2011-01-01

    E-commerce firms are increasingly adopting recommendation systems to effectively target customers with products and services. The first essay examines the impact that improving a recommender system has on firms that deploy such systems. A market with customers heterogeneous in their search costs is considered. We find that in a monopoly, a firm…

  6. Optimization Techniques for 3D Graphics Deployment on Mobile Devices

    Science.gov (United States)

    Koskela, Timo; Vatjus-Anttila, Jarkko

    2015-03-01

    3D Internet technologies are becoming essential enablers in many application areas including games, education, collaboration, navigation and social networking. The use of 3D Internet applications with mobile devices provides location-independent access and richer use context, but also performance issues. Therefore, one of the important challenges facing 3D Internet applications is the deployment of 3D graphics on mobile devices. In this article, we present an extensive survey on optimization techniques for 3D graphics deployment on mobile devices and qualitatively analyze the applicability of each technique from the standpoints of visual quality, performance and energy consumption. The analysis focuses on optimization techniques related to data-driven 3D graphics deployment, because it supports off-line use, multi-user interaction, user-created 3D graphics and creation of arbitrary 3D graphics. The outcome of the analysis facilitates the development and deployment of 3D Internet applications on mobile devices and provides guidelines for future research.

  7. Aerial Deployment and Inflation System for Mars Helium Balloons

    Science.gov (United States)

    Lachenmeler, Tim; Fairbrother, Debora; Shreves, Chris; Hall, Jeffery, L.; Kerzhanovich, Viktor V.; Pauken, Michael T.; Walsh, Gerald J.; White, Christopher V.

    2009-01-01

    A method is examined for safely deploying and inflating helium balloons for missions at Mars. The key for making it possible to deploy balloons that are light enough to be buoyant in the thin, Martian atmosphere is to mitigate the transient forces on the balloon that might tear it. A fully inflated Mars balloon has a diameter of 10 m, so it must be folded up for the trip to Mars, unfolded upon arrival, and then inflated with helium gas in the atmosphere. Safe entry into the Martian atmosphere requires the use of an aeroshell vehicle, which protects against severe heating and pressure loads associated with the hypersonic entry flight. Drag decelerates the aeroshell to supersonic speeds, then two parachutes deploy to slow the vehicle down to the needed safe speed of 25 to 35 m/s for balloon deployment. The parachute system descent dynamic pressure must be approximately 5 Pa or lower at an altitude of 4 km or more above the surface.

  8. Structural analysis of ITER multi-purpose deployer

    International Nuclear Information System (INIS)

    Manuelraj, Manoah Stephen; Dutta, Pramit; Gotewal, Krishan Kumar; Rastogi, Naveen; Tesini, Alessandro; Choi, Chang-Hwan

    2016-01-01

    Highlights: • System modelling for structural analysis of the Multi-Purpose Deployer (MPD). • Finite element modeling of the Multi-Purpose Deployer (MPD). • Static, modal and seismic response analysis of the Multi-Purpose Deployer (MPD). • Iterative structural analysis and design update to satisfy the structural criteria. • Modal analysis for various kinematic configurations. • Reaction force calculations on the interfacing systems. - Abstract: The Multi-Purpose Deployer (MPD) is a general purpose ITER in-vessel remote handling (RH) system. The main handling equipment, known as the MPD Transporter, consists of a series of linked bodies, which provide anchoring to the vacuum vessel port and an articulated multi-degree of freedom motion to perform various in-vessel maintenance tasks. During the in-vessel operations, the structural integrity of the system should be guaranteed against various operational and seismic loads. This paper presents the structural analysis results of the concept design of the MPD Transporter considering the seismic events. Static structural, modal and frequency response spectrum analyses have been performed to verify the structural integrity of the system, and to provide reaction forces to the interfacing systems such as vacuum vessel and cask. Iterative analyses and design updates are carried out based on the reference design of the system to improve the structural behavior of the system. The frequency responses of the system in various kinematics and payloads are assessed.

  9. Relationships between soldiers' PTSD symptoms and spousal communication during deployment.

    Science.gov (United States)

    Carter, Sarah; Loew, Benjamin; Allen, Elizabeth; Stanley, Scott; Rhoades, Galena; Markman, Howard

    2011-06-01

    Social support, including support from spouses, may buffer against posttraumatic stress disorder (PTSD) symptoms. The current study assessed whether the frequency of spousal communication during a recent deployment, a potentially important source of support for soldiers, was related to postdeployment PTSD symptoms. Data came from 193 married male Army soldiers who returned from military deployment within the past year. For communication modalities conceptualized as delayed (i.e., letters, care packages, and e-mails), greater spousal communication frequency during deployment was associated with lower postdeployment PTSD symptom scores, but only at higher levels of marital satisfaction (p = .009). At lower marital satisfaction, more delayed spousal communication during deployment was associated with more PTSD symptoms (p = .042). For communication modalities conceptualized as interactive (i.e., phone calls, instant messaging, instant messaging with video), the same general direction of effects was seen, but the interaction between communication frequency and marital satisfaction predicting PTSD symptoms did not reach significance. Copyright © 2011 International Society for Traumatic Stress Studies.

  10. Operational deployment of genetic gain | Pallett | Southern Forests ...

    African Journals Online (AJOL)

    Tree improvement is central to increasing plantation productivity per unit land area in many countries that rely on an exotic fast grown plantation resource as a source of wood and fibre. In order to achieve an acceptable return on the investment made in tree breeding, it is important that material be deployed with both good ...

  11. Security-by-experiment : lessons from responsible deployment in cyberspace

    NARCIS (Netherlands)

    Pieters, W.; Hadžiosmanović, D.; Dechesne, F.

    Conceiving new technologies as social experiments is a means to discuss responsible deployment of technologies that may have unknown and potentially harmful side-effects. Thus far, the uncertain outcomes addressed in the paradigm of new technologies as social experiments have been mostly

  12. Security-by-Experiment: Lessons from Responsible Deployment in Cyberspace

    NARCIS (Netherlands)

    Pieters, Wolter; Hadziosmanovic, D.; Dechesne, Francien

    Conceiving new technologies as social experiments is a means to discuss responsible deployment of technologies that may have unknown and potentially harmful side-effects. Thus far, the uncertain outcomes addressed in the paradigm of new technologies as social experiments have been mostly

  13. Security-by-Experiment: Lessons from Responsible Deployment in Cyberspace

    NARCIS (Netherlands)

    Pieters, W.; Hadziosmanovic, D.; Dechesne, F

    2015-01-01

    Conceiving new technologies as social experiments is a means to discuss responsible deployment of technologies that may have unknown and potentially harmful side-effects. Thus far, the uncertain outcomes addressed in the paradigm of new technologies as social experiments have been mostly

  14. Security-by-Experiment : Lessons from Responsible Deployment in Cyberspace

    NARCIS (Netherlands)

    Pieters, W.; Hadžiosmanovi?, D.; Dechesne, F.

    2015-01-01

    onceiving new technologies as social experiments is a means to discuss responsible deployment of technologies that may have unknown and potentially harmful side-effects. Thus far, the uncertain outcomes addressed in the paradigm of new technologies as social experiments have been mostly

  15. Post-deployment usability evaluation of a radiology workstation

    NARCIS (Netherlands)

    Jorritsma, Wiard; Cnossen, Fokie; Dierckx, Rudi A.; Oudkerk, Matthijs; Van Ooijen, Peter M. A.

    Objectives: To determine the number, nature and severity of usability issues radiologists encounter while using a commercially available radiology workstation in clinical practice, and to assess how well the results of a pre-deployment usability evaluation of this workstation generalize to clinical

  16. Problems in the Deployment of Learning Networks In Small Organizations

    NARCIS (Netherlands)

    Shankle, Dean E.; Shankle, Jeremy P.

    2006-01-01

    Please, cite this publication as: Shankle, D.E., & Shankle, J.P. (2006). Problems in the Deployment of Learning Networks In Small Organizations. Proceedings of International Workshop in Learning Networks for Lifelong Competence Development, TENCompetence Conference. March 30th-31st, Sofia, Bulgaria:

  17. The ‘Deployment of Extra Processing’ Account of Attention

    DEFF Research Database (Denmark)

    Fazekas, Peter; Nanay, Bence

    2015-01-01

    The paper formulates an alternative view about the core function of attention claiming that attention is not selection but the deployment of extra processing capacity. This way of thinking about attention has greater explanatory power, since it proposes a common implementation both for selection...

  18. Calibration procedure for Slocum glider deployed optical instruments.

    Science.gov (United States)

    Cetinić, Ivona; Toro-Farmer, Gerardo; Ragan, Matthew; Oberg, Carl; Jones, Burton H

    2009-08-31

    Recent developments in the field of the autonomous underwater vehicles allow the wide usage of these platforms as part of scientific experiments, monitoring campaigns and more. The vehicles are often equipped with sensors measuring temperature, conductivity, chlorophyll a fluorescence (Chl a), colored dissolved organic matter (CDOM) fluorescence, phycoerithrin (PE) fluorescence and spectral volume scattering function at 117 degrees, providing users with high resolution, real time data. However, calibration of these instruments can be problematic. Most in situ calibrations are performed by deploying complementary instrument packages or water samplers in the proximity of the glider. Laboratory calibrations of the mounted sensors are difficult due to the placement of the instruments within the body of the vehicle. For the laboratory calibrations of the Slocum glider instruments we developed a small calibration chamber where we can perform precise calibrations of the optical instruments aboard our glider, as well as sensors from other deployment platforms. These procedures enable us to obtain pre- and post-deployment calibrations for optical fluorescence instruments, which may differ due to the biofouling and other physical damage that can occur during long-term glider deployments. We found that biofouling caused significant changes in the calibration scaling factors of fluorescent sensors, suggesting the need for consistent and repetitive calibrations for gliders as proposed in this paper.

  19. Astronaut Tamara Jernigan deploys life raft during WETF training

    Science.gov (United States)

    1994-01-01

    Astronaut Tamara E. Jernigan, STS-67 payload commander, deploys a life raft during a session of emergency bailout training. The training took place in the 25-feet deep pool at JSC's Weightless Environment Training Facility (WETF). Jernigan was joined by her crew mates for the training session. Several SCUBA-equipped divers who assisted in the training can be seen in this photograph.

  20. Emergency deployment of genetically engineered veterinary vaccines in Europe

    NARCIS (Netherlands)

    Ramezanpour, Bahar; Foucauld, de Jean; Kortekaas, Jeroen

    2016-01-01

    On the 9th of November 2015, preceding the World Veterinary Vaccine Congress, a workshop was held to discuss how veterinary vaccines can be deployed more rapidly to appropriately respond to future epizootics in Europe. Considering their potential and unprecedented suitability for surge